Metode yang digunakan adalah metode dari Menyerhof yang telah dimodifikasi WIKA Rencana:

Pijin

25

cm

1
N

As

40

Ab

SF
5

=
=
=
=
=

(Lad capacity (ton))


(Nilai SPT pada ujung dasar tiang pancang)
(Nilai rata rata SPT sepanjang tiang pancang)
(Luas penampng tiang pancang (m))
(Luas keliling tiang pancang (m))
(Tidak dipakai jika pondasinya BORE PILE = 0)

Type Kotak

Dimana :
Pijin
Np
Ap
As

Lokasi : LIPPO CIKARANG


Daya Dukung Tanah BH-1 Berdasarkan Rumus WIKA
H
(m)
Np
1
4.0
2
4.0
3
7.0
4
7.0
5
8.0
6
8.0
7
9.0
8
9.0
9
12.0
10
15.0
11
18.0
12
25.0
13
32.0
14
37.0
15
39.0
16
40.0
17
38.0
18
36.0
19
32.0
20
40.0

Nav
4.00
4.00
5.00
5.50
6.00
6.33
6.71
7.00
7.56
8.30
9.18
10.50
12.15
13.93
15.60
17.13
18.35
19.33
20.00
21.00

Ap
(m)
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063

As
(m)
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00

Qult
(ton)
10.8
11.6
20.5
21.9
26.0
27.6
31.9
33.7
43.6
54.1
65.2
87.7
111.6
131.5
144.3
154.8
157.4
159.6
156.0
184.0

SF = 2
5.40
5.80
10.25
10.95
13.00
13.80
15.95
16.85
21.80
27.05
32.60
43.85
55.80
65.75
72.15
77.40
78.70
79.80
78.00
92.00

Qad = Qu / SF
SF = 3
SF = 5
2.16
3.60
2.32
3.87
4.10
6.83
4.38
7.30
5.20
8.67
5.52
9.20
6.38
10.63
6.74
11.23
8.72
14.53
10.82
18.03
13.04
21.73
17.54
29.23
22.32
37.20
26.30
43.83
28.86
48.10
30.96
51.60
31.48
52.47
31.92
53.20
31.20
52.00
36.80
61.33

Metode yang digunakan adalah metode dari Menyerhof yang telah dimodifikasi WIKA Rencana:
Pijin

Dimana :
Pijin
Np
Ap
As

=
=
=
=
=

20

cm

Type Kotak

1
N

As

40

Ab

SF

(Lad capacity (ton))


(Nilai SPT pada ujung dasar tiang pancang)
(Nilai rata rata SPT sepanjang tiang pancang)
(Luas penampng tiang pancang (m))
(Luas keliling tiang pancang (m))

Lokasi : WRINGIN ANOM GRESIK


Daya Dukung Tanah BH-3 Berdasarkan Rumus WIKA
H
(m)
Np
1
3.0
2
3.0
3
3.0
4
4.0
5
5.0
6
5.0
7
8.0
8
11.0
9
14.0
10
15.0
11
15.0
12
16.0
13
18.0
14
21.0
15
14.0
16
16.0
17
18.0
18
22.0
19
23.0
20
24.0
21
22.0
22
23.0
23
24.0
24
25.0
25
30.0
26
34.0
27
34.0
28
35.0
29
39.0
30
39.0

Nav
3.00
3.00
3.00
3.25
3.60
3.83
4.43
5.25
6.22
7.10
7.82
8.50
9.23
10.07
10.33
10.69
11.12
11.72
12.32
12.90
13.33
13.77
14.22
14.67
15.28
16.00
16.67
17.32
18.07
18.77

Ap
(m)
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040

As
(m)
0.80
1.60
2.40
3.20
4.00
4.80
5.60
6.40
7.20
8.00
8.80
9.60
10.40
11.20
12.00
12.80
13.60
14.40
15.20
16.00
16.80
17.60
18.40
19.20
20.00
20.80
21.60
22.40
23.20
24.00

Qult
(ton)
5.3
5.8
6.2
8.5
10.9
11.7
17.8
24.3
31.4
35.4
37.8
41.9
48.0
56.2
47.2
53.0
59.0
69.0
74.2
79.7
80.0
85.3
90.7
96.3
109.1
121.0
126.4
133.6
146.2
152.5

SF = 2
2.64
2.88
3.12
4.24
5.44
5.84
8.88
12.16
15.68
17.68
18.88
20.96
24.00
28.08
23.60
26.48
29.52
34.48
37.12
39.84
40.00
42.64
45.36
48.16
54.56
60.48
63.20
66.80
73.12
76.24

Qad = Qu / SF
SF = 3
SF = 5
1.06
1.76
1.15
1.92
1.25
2.08
1.70
2.83
2.18
3.63
2.34
3.89
3.55
5.92
4.86
8.11
6.27
10.45
7.07
11.79
7.55
12.59
8.38
13.97
9.60
16.00
11.23
18.72
9.44
15.73
10.59
17.65
11.81
19.68
13.79
22.99
14.85
24.75
15.94
26.56
16.00
26.67
17.06
28.43
18.14
30.24
19.26
32.11
21.82
36.37
24.19
40.32
25.28
42.13
26.72
44.53
29.25
48.75
30.50
50.83

Metode yang digunakan adalah metode dari Menyerhof yang telah dimodifikasi WIKA Rencana f:
Pijin

45

cm

1
N

As

40

Ab

SF

=
=
=
=
=

(Lad capacity (ton))


(Nilai SPT pada ujung dasar tiang pancang)
(Nilai rata rata SPT sepanjang tiang pancang)
(Luas penampng tiang pancang (m))
(Luas keliling tiang pancang (m))
(Tidak dipakai jika pondasinya BORE PILE = 0)

Type Kotak

Dimana :
Pijin
Np
Nav
Ap
As

SAYUNG
Lokasi :
DEMAK
Daya Dukung Tanah BH-1 Berdasarkan Rumus WIKA
H
(m)
Np
1
1.0
2
2.0
3
4.0
4
4.0
5
4.0
6
3.0
7
3.0
8
2.0
9
2.0
10
2.0
11
1.0
12
1.0
13
2.0
14
2.0
15
2.0
16
2.0
17
2.0
18
3.0
19
4.0
20
5.0
21
6.0
22
6.0
23
8.0
24
10.0
25
11.0
26
11.0
27
11.0
28
11.0
29
11.0
30
11.0

Nav
1.00
1.50
2.33
2.75
3.00
3.00
3.00
2.88
2.78
2.70
2.55
2.42
2.38
2.36
2.33
2.31
2.29
2.33
2.42
2.55
2.71
2.86
3.09
3.38
3.68
3.96
4.22
4.46
4.69
4.90

Ap
(m)
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203
0.203

As
(m)
1.80
3.60
5.40
7.20
9.00
10.80
12.60
14.40
16.20
18.00
19.80
21.60
23.40
25.20
27.00
28.80
30.60
32.40
34.20
36.00
37.80
39.60
41.40
43.20
45.00
46.80
48.60
50.40
52.20
54.00

Qult
(ton)
8.5
17.3
34.9
36.4
37.8
30.8
31.9
24.5
25.2
25.9
18.2
18.5
27.4
28.1
28.8
29.5
30.2
39.4
49.0
58.9
69.1
71.3
90.4
110.2
122.2
126.2
130.1
134.1
138.1
142.0

SF = 2
4.23
8.64
17.46
18.18
18.90
15.39
15.93
12.24
12.60
12.96
9.09
9.27
13.68
14.04
14.40
14.76
15.12
19.71
24.48
29.43
34.56
35.64
45.18
55.08
61.11
63.09
65.07
67.05
69.03
71.01

Qad = Qu / SF
SF = 3
SF = 5
1.69
2.82
3.46
5.76
6.98
11.64
7.27
12.12
7.56
12.60
6.16
10.26
6.37
10.62
4.90
8.16
5.04
8.40
5.18
8.64
3.64
6.06
3.71
6.18
5.47
9.12
5.62
9.36
5.76
9.60
5.90
9.84
6.05
10.08
7.88
13.14
9.79
16.32
11.77
19.62
13.82
23.04
14.26
23.76
18.07
30.12
22.03
36.72
24.44
40.74
25.24
42.06
26.03
43.38
26.82
44.70
27.61
46.02
28.40
47.34

Perhitungan Daya Dukung Ijin 1 Tiang Pancang berdasarkan data sondir Mayerhof

JHP
tp
n kell
tp
P

t
SF
SF
1
2

DIMENSI PILE

20x20 cm

20

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
(Kg/Cm2)
45
40
45
50
60
65
40
45
45
50
60
70

JHP
(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
26.32
28.69
32.56
36.43
40.96
44.83
26.61
30.48
33.68
37.55
42.08
48.21

25x25 cm

25

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
(Kg/Cm2)
45
40
45
50
60
65
40
45
45
50
60
70

JHP
(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
34.78
37.53
42.58
47.62
53.70
58.74
34.93
39.98
43.98
49.02
55.10
63.18

30x30 cm
No

30
Titik Sondir
S-I
S-I
S-I
S-I
S-I
S-I

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
(Kg/Cm2)
45
40
45
50
60
65

JHP
(Kg/Cm)
1270
1460
1660
1860
2060
2260

(ton)
43.98
47.04
53.34
59.64
67.44
73.74

S-II
S-II
S-II
S-II
S-II
S-II

-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

40
45
45
50
60
70

1330
1530
1730
1930
2130
2430

43.92
50.22
55.02
61.32
69.12
79.32

35x35 cm

35

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
2
(Kg/Cm )
45
40
45
50
60
65
40
45
45
50
60
70

JHP
(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
53.94
57.21
64.86
72.50
82.18
89.82
53.57
61.22
66.82
74.46
84.14
96.62

40x40 cm

40

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
2
(Kg/Cm )
45
40
45
50
60
65
40
45
45
50
60
70

JHP
(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
64.64
68.05
77.12
86.19
97.92
106.99
63.89
72.96
79.36
88.43
100.16
115.09

50x50 cm
No

50
Titik Sondir
S-I
S-I
S-I
S-I

Depth
(m)
-13.00
-14.00
-15.00
-16.00

Cn
2
(Kg/Cm )
45
40
45
50

JHP
(Kg/Cm)
1270
1460
1660
1860

(ton)
88.30
91.73
103.90
116.07

S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

60
65
40
45
45
50
60
70

2060
2260
1330
1530
1730
1930
2130
2430

Depth

Cn
(Kg/Cm2)
45
40
45
50
60
65
40
45
45
50
60
70

JHP

132.40
144.57
86.53
98.70
106.70
118.87
135.20
155.53

60x60 cm

60

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
114.96
118.08
133.68
149.28
170.88
186.48
111.84
127.44
137.04
152.64
174.24
200.64

80x80 cm

80

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
(Kg/Cm2)
45
40
45
50
60
65
40
45
45
50
60
70

JHP
(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
177.28
178.77
202.24
225.71
259.84
283.31
170.45
193.92
206.72
230.19
264.32
304.85

100x100 cm
No

100
Titik Sondir
S-I
S-I

Depth
(m)
-13.00
-14.00

Cn
(Kg/Cm2)
45
40

JHP
(Kg/Cm)
1270
1460

(ton)
251.60
250.13

S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

45
50
60
65
40
45
45
50
60
70

1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

282.80
315.47
364.80
397.47
239.73
272.40
288.40
321.07
370.40
427.73

(sampel tanah diambil dari lokasi warugunung karangpilang Surabaya)

JHP
tp
n kell
tp
P

t
SF
SF
1
2

DIAMETER PILE

20 cm

20

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
(Kg/Cm2)
45
40
45
50
60
65
40
45
45
50
60
70

JHP

P Ijin Tanah

(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
20.67
22.54
25.57
28.61
32.17
35.21
20.90
23.94
26.45
29.49
33.05
37.87

JHP

P Ijin Tanah

(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
27.31
29.48
33.44
37.40
42.18
46.14
27.44
31.40
34.54
38.50
43.28
49.62

25 cm

25

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
(Kg/Cm2)
45
40
45
50
60
65
40
45
45
50
60
70

30 cm
No

30
Titik Sondir
S-I
S-I
S-I
S-I
S-I
S-I

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
(Kg/Cm2)
45
40
45
50
60
65

JHP

P Ijin Tanah

(Kg/Cm)
1270
1460
1660
1860
2060
2260

(ton)
34.54
36.95
41.89
46.84
52.97
57.92

S-II
S-II
S-II
S-II
S-II
S-II

-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

40
45
45
50
60
70

1330
1530
1730
1930
2130
2430

34.49
39.44
43.21
48.16
54.29
62.30

35 cm

35

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
2
(Kg/Cm )
45
40
45
50
60
65
40
45
45
50
60
70

JHP

P Ijin Tanah

(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
42.36
44.94
50.94
56.94
64.54
70.55
42.08
48.08
52.48
58.48
66.08
75.89

40 cm

40

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
2
(Kg/Cm )
45
40
45
50
60
65
40
45
45
50
60
70

JHP

P Ijin Tanah

(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
50.77
53.45
60.57
67.69
76.91
84.03
50.18
57.30
62.33
69.45
78.67
90.39

JHP

P Ijin Tanah

(Kg/Cm)
1270
1460
1660
1860

(ton)
69.35
72.05
81.60
91.16

50 cm
No

50
Titik Sondir
S-I
S-I
S-I
S-I

Depth
(m)
-13.00
-14.00
-15.00
-16.00

Cn
2
(Kg/Cm )
45
40
45
50

S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

60
65
40
45
45
50
60
70

2060
2260
1330
1530
1730
1930
2130
2430

103.99
113.54
67.96
77.52
83.80
93.36
106.19
122.16

Depth

Cn
(Kg/Cm2)
45
40
45
50
60
65
40
45
45
50
60
70

JHP

P Ijin Tanah

(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
90.29
92.74
104.99
117.24
134.21
146.46
87.84
100.09
107.63
119.88
136.85
157.58

60 cm

60

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

80 cm

80

No

Titik Sondir

S-I
S-I
S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

Depth
(m)
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

Cn
(Kg/Cm2)
45
40
45
50
60
65
40
45
45
50
60
70

JHP

P Ijin Tanah

(Kg/Cm)
1270
1460
1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

(ton)
139.24
140.41
158.84
177.27
204.08
222.51
133.87
152.30
162.36
180.79
207.60
239.43

JHP

P Ijin Tanah

(Kg/Cm)
1270
1460

(ton)
197.61
196.45

100 cm
No

100
Titik Sondir
S-I
S-I

Depth
(m)
-13.00
-14.00

Cn
(Kg/Cm2)
45
40

S-I
S-I
S-I
S-I
S-II
S-II
S-II
S-II
S-II
S-II

-15.00
-16.00
-17.00
-18.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00

45
50
60
65
40
45
45
50
60
70

1660
1860
2060
2260
1330
1530
1730
1930
2130
2430

222.11
247.77
286.51
312.17
188.29
213.94
226.51
252.17
290.91
335.94

PERHITUNGAN DAYA DUKUNG TIANG KOTAK


Proyek
Location
Hole No.

:
:
: SONDIR 1

JHP
tp
n kell
tp
P

t
SF
SF
1
2
Tipe Tiang

: Tiang Pancang Dimensi Kecil

Tanggal test :

Kedalaman
(meter)

Dimensi
Tiang (cm)

Luas
(cm2)

Keliling
(cm)

Nilai Konus
(kg/cm2)

JHP
(kg/cm)

Daya Dukung
Ijin Tekan (ton)

Daya Dukung
Ijin Tarik (ton)

12.00

20 x 20
25 x 25
30 x 30
35 x 35
40 x 40
45 x 45
50 x 50

400
625
900
1225
1600
2025
2500

80
100
120
140
160
180
200

50
50
50
50
50
50
50

880
880
880
880
880
880
880

20.75
28.02
36.12
45.06
54.83
65.43
76.87

8.80
11.00
13.20
15.40
17.60
19.80
22.00

LABORATORIUM UJI MATERIAL


JURUSAN TEKNIK SIPIL FTSP - ITS
Kampus ITS Manyar Jl Menur 127 Telp 5947637 5981006 Surabaya

PERHITUNGAN DAYA DUKUNG TIANG BULAT


Proyek
Location
Hole No.

: Perencanaan Gedung KPKN Sidoarjo


: Jl Munginsidi 79 Sidoarjo
: Sondir 1

JHP
tp
n kell
tp
P

t
SF
SF
1
2
Tipe Tiang

: Tiang Pancang Dimensi Kecil

Tanggal test : Agustus 2003

Kedalaman
(meter)

Dimensi
Tiang (cm)

Luas
(cm2)

Keliling
(cm)

Nilai Konus
(kg/cm2)

JHP
(kg/cm)

Daya Dukung
Ijin Tekan (ton)

5.00

20
25
30
35
40

314.00
490.63
706.50
961.63
1256.00

31.40
39.25
47.10
54.95
62.80

5
5
5
5
5

110
110
110
110
110

1.21
1.68
2.21
2.81
3.47

Kedalaman
(meter)

Dimensi
Tiang (cm)

Luas
(cm2)

Keliling
(cm)

Nilai Konus
(kg/cm2)

JHP
(kg/cm)

Daya Dukung
Ijin Tekan (ton)

10.00

20
25
30
35
40

314.00
490.63
706.50
961.63
1256.00

31.40
39.25
47.10
54.95
62.80

10
10
10
10
10

310
310
310
310
310

2.99
4.07
5.28
6.61
8.08

Kedalaman
(meter)

Dimensi
Tiang (cm)

Luas
(cm2)

Keliling
(cm)

Nilai Konus
(kg/cm2)

JHP
(kg/cm)

Daya Dukung
Ijin Tekan (ton)

15.00

20
25
30
35
40

314.00
490.63
706.50
961.63
1256.00

31.40
39.25
47.10
54.95
62.80

10
10
10
10
10

670
670
670
670
670

5.25
6.89
8.67
10.57
12.60

Catatan
:
Kedalaman tiang dihitung dari permukaan tanah saat pengujian dilapangan dan harus dikoreksi
bilamana dilakukan pekerjaan cut/fill yang merubah level muka tanah

AL

urabaya

BULAT

ustus 2003
Daya Dukung
Ijin Tarik (ton)
0.43
0.54
0.65
0.76
0.86

Daya Dukung
Ijin Tarik (ton)
1.22
1.52
1.83
2.13
2.43

Daya Dukung
Ijin Tarik (ton)
2.63
3.29
3.94
4.60
5.26

harus dikoreksi

PERHITUNGAN DAYA DUKUNG TIANG PANCANG KOTAK


Proyek
Lokasi
Titik No.

: Lanjutan DED PPI Romokalisari


: Romokalisari Kota Surabaya
: 1 (satu)

Data Tiang Pancang :


Dimensi tiang
Luas
Keliling
Berat tiang
Kedalaman
m
3
6
9
12
15
18
21
24
27
30

0
3
6
9
12
15
18
21
24
27

=
=
=
=
Jenis Tanah

Lempung berlanau
Lempung
Lempung
Lempung
Lempung
Lempung berlanau berpasir
Lempung berlanau berpasir
lempung
Pasir berkulit kerang
Pasir berkulit kerang

0.4
0.160
1.600
0.290

m
m2
m
ton/m'

NdataNdata

Nrata2Nrata2

N/5<10N/5<10

N<12N<12

1
12
10
12
14
15
23
25
24
34

0.5
6.5
11
11
13
14.5
19
24
24.5
29

0.1
1.3
2.2
2.2
2.6
2.9
3.8
4.8
4.9
5.8

0.5
6.5
11
11
12
12
12
12
12
12

(t/m2)
1.2
1.2
1
1
1.3
1.3
1.7
1
1.6
1.8

Teg Gesekan
t/m2
1.2
6.5
11
11
12
12
12
12
4.9
5.8

Ps
ton
5.760
31.200
52.800
52.800
57.600
57.600
57.600
57.600
23.520
27.840

SPsSPs P ujungP ujung PultPult Pall (SF=3)Pall (SF=3)


ton
5.760
36.960
89.760
142.560
200.160
257.760
315.360
372.960
396.480
424.320

ton
3.200
38.400
32.000
38.400
44.800
48.000
73.600
80.000
76.800
108.800

ton
8.960
75.360
121.760
180.960
244.960
305.760
388.960
452.960
473.280
533.120

Pall (SF=2,5)Pall (SF=2,5) Pall (SF=2)Pall (SF=2) Ptarik (SF=3)Ptarik (SF=3)

ton
2.1
23.4
38.0
56.8
77.3
96.7
123.6
144.0
149.9
169.0

ton
2.7
28.4
46.1
68.9
93.6
117.1
149.5
174.2
181.5
204.6

Koreksi gesekan :
Kohesif :

C atau N<= 12

Non Kohesif :

N/5 <=10

Tegangan Gesekan :

12 (N>12/C)* t/m2

t/m

Ps : Teg Gesek * (selisih kedalaman)* N rata rata

ton

C : Kohesi

t/m

2t/m2

SPs

= Komulatif Ps

ton

P ujung

=20*luas*N data

ton

P all

= Ps + P ujung

ton

P all (SF3) = (Pall/3) - (Berat tiang * Kedalaman)


2

P tarik

= Ps /3

ton
ton

ton
3.61
35.9
58.3
87.0
118.1
147.7
188.4
219.5
228.8
257.9

ton
1.92
12.32
29.92
47.52
66.72
85.92
105.12
124.32
132.16
141.44

LABORATORIUM UJI MATERIAL


JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK SIPIL DAN PERENCANAAN

INSTITUT TEKNOLOGI SEPULUH NOPEMBER


Kampus ITS Manyar Jl. Menur 127 Surabaya, 60116 Telp.5947637 Telp./Fax. 5981006

PERHITUNGAN DAYA DUKUNG BOR PILE ATAU TIANG PANCANG BERDASARKAN SPT

PROYEK : : RENCANA PABRIK TEXTILE


LOKASI
: : DESA KEDUNGSOKO KEC. SUKOMORO KAB NGANJUK
TITIK NO. : : BORE HOLE I
Kedalaman

Diamater

Sigment 1

Sigment 2

Sigment 3

SPT rata2

SPT rata2

SPT rata2

T.Pancang

L1

L2

L3

pada L1

pada L2

pada L3

cm

N1

N2

N3

30

25

10

10

10

30

50

30

30

10

10

10

30

50

30

40

10

10

10

30

50

30

45

10

10

10

30

50

Pult

SPT rata2

SQs

Qp

pada ujung

selimut

ujung

Pijin
SF=3

Np

ton

ton

ton

ton

50

129.25

98.21

227.46

75.82

50

155.10

141.43

296.53

98.84

50

206.80

251.43

458.23

152.74

50

232.65

318.21

550.86

183.62

Keterangan :

SQs

= S{(k x Nrata-rata x L)/50}

Qp

= 4 x N ujung x A

= keliling tiang pancang

= panjang tiang pancang

= luas penampang tiang pancang

= nilai SPT

Qs

= daya dukung selimut

Qp

= daya dukung ujung tiang

Pijin

= (Qs + Qp)/SF

SF

= Safety factor, diambil 3

T Pancang

Muka tanah setempat

L1

L2

L3

PERHITUNGAN DAYA DUKUNG BOR PILE ATAU TIANG PANCANG KOTAK BERDASARKAN SPT

PROYEK
LOKASI
TITIK NO.

: PABRIK PT.NYLEX
: GRESIK - JAWA TIMUR
: BORE HOLE I

Kedalaman

Diamater

Sigment 1

Sigment 2

Sigment 3

SPT rata2

SPT rata2

SPT rata2

T.Pancang

L1

L2

L3

pada L1

pada L2

pada L3

cm

N1

N2

N3

20

20

4.5

10

13

20

25

4.5

10

13

20

30

4.5

10

13

20

35

4.5

10

13

Pult

SPT rata2

SQs

Qp

pada ujung

selimut

ujung

Pijin
SF=3

Np

ton

ton

ton

ton

24

28.72

38.40

67.12

22.37

24

35.90

60.00

95.90

31.97

24

43.08

86.40

129.48

43.16

24

50.26

117.60

167.86

55.95

Keterangan : SQs
Qp

T Pancang

Muka tanah setempat

= S{(k x Nrata-rata x L)/50}


= 4 x N ujung x A

= keliling tiang pancang

= panjang tiang pancang

= luas penampang tiang pancang

= nilai SPT

Qs

= daya dukung selimut

Qp

= daya dukung ujung tiang

Pijin

= (Qs + Qp)/SF

SF

= Safety factor, diambil 3

L1

L2

L3

Pada tanah non-kohesif, gesekan selimut dihitung dengan formula :

TANAH NON KOHESIF SPT PT.GJK


Metode yang digunakan adalah metode dari Reese & Wright 1977 Renc:
Pijin

100

Qp+Qs
FK

cm
fs = Ko . v . tan f

Qp
Qs

=
=

qp.Ap
Fs.L.As

(Lad capacity (ton))


(Nilai SPT pada ujung dasar tiang pancang)

Qp
Qs

=
=

Daya dukung ultimate ujung tiang (ton)


Daya dukung ultimate Selimut tiang (ton)

(Nilai rata rata SPT sepanjang tiang pancang)


(Luas penampng tiang pancang (m))

qp
L

=
=

Tahanan Ujung persatuan luas (t/m2)


Panjang Tiang (m)

dimana :

Dimana :

Ko

Pijin
Np
Ap
As

=
=
=
=
=

Fk

(Luas keliling tiang pancang (m))


(Safety Faktor Qp= 4, Qs= 3)

Fs

=
=

= 1 sin f

Daya Dukung Tanah BH-2 Berdasarkan Rumus Reese & Wright


H
(m)
Np
Nav
1
15.0
15.00
2
50.0
32.50
3
50.0
38.33
4
50.0
41.25
5
50.0
43.00
6
50.0
44.17
7
50.0
45.00
8
50.0
45.63
9
50.0
46.11
10
50.0
46.50
11
50.0
46.82
12
50.0
47.08
13
50.0
47.31
14
50.0
47.50
15
50.0
47.67
16
50.0
47.81
17
50.0
47.94
18
50.0
48.06
19
50.0
48.16
20
50.0
48.25

Ap
(m)
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785
0.785

As
(m)
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140
3.140

Qp
(ton)
47.53
47.53
423.90
423.90
440.39
440.39
440.39
440.39
440.39
440.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Qs
(ton)
17.80
35.61
55.58
74.10
92.63
111.16
129.68
148.21
166.73
185.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

= tekanan vertikal efektif tanah (ton/m2)

= sudut geser dalam tanah (0)

Gesekan selimut tiang persatuan luas (t/m )


Sudut Geser

44

Sesuai data tanah

Tabel Vesic 1977


-

= Koefisien tekanan tanah at rest

Qp
SF = 3
15.84
15.84
141.30
141.30
146.80
146.80
146.80
146.80
146.80
146.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Qs
SF = 3
5.93
11.87
18.53
24.70
30.88
37.05
43.23
49.40
55.58
61.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Q.ult
(ton)
21.78
27.71
159.83
166.00
177.67
183.85
190.02
196.20
202.37
208.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

qp
18.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

qp
60.55
60.55
540.00
540.00
561.00
561.00
561.00
561.00
561.00
561.00

q'
(t.h)
1.73
1.73
1.80
1.80
1.87
1.87
1.87
1.87
1.87
1.87

Nq*
(a-1)
35
35
150
150
150
150
150
150
150
150

Tabel qs vs N-SPT
Fs

1
1
2
2
2
2
2
2
2
2

5.67
5.67
5.90
5.90
5.90
5.90
5.90
5.90
5.90
5.90

L.Tp

qp =
1
2
3
4
5
6
7
8
9
10

2N

Jika N 50 maka (2x9)


Jika N 50 maka (2x50)

qp = q' X(Nq'-1)
q'= t x Lapis.tnh
Nq'= Lihat tabel korelasi sudut geser dengan Nspt
Ko=
'v=
L=
'=
tan 35.2=

0.31
27
15
35.2
0.71

( 1- sin 44)
( x L)
(15 x D) D=100 cm
( 0.8 x 44)

NB: Huruf merah sesuaikan dengan data test tanah yang ditijau