Anda di halaman 1dari 7

FORMULIR B6

JADWAL RENCANA PENEMPATAN TENAGA


JASA PENGAWASAN PELAKSANAAN KONSTRUKSI
PEMBANGUNAN JALAN TOLSEMARANG - SOLO
TAHAP II : BAWEN - SOLO SEKSI 3: BAWEN - SALATIGA PAKET 3.1: BAWEN - POLOSIRI
Mob
No.

1
2
3
4
5
6
7
8
9
10

Uraian
TENAGA AHLI
Resident / Highway Engineer
Ir. Slamet Edi
Highway Engineer
Ir. Istiyanto Heru Utomo
Structure Engineer
Ir. Slamet Sentosa
Soil & Material Engineer / Pavement
Ir. Agnyono Riadi, MBA
Drainage Engineer
Ir. Jumari
Quantity Engg./ Document Specialist
Ir. Ari Wahono, MT
Chief Inspector
Ir. Ali Ikhwan
Visiting Specialist-Geotechnical
Prof. Ir. Paulus P Raharjo
Visiting Specialist-Structure
Ir. Himawan Indarto, MS
Environmental Specialist
Iwan Sutaryono, ST

ASSISTEN TENAGA AHLI


Asisten Highway Engineer
Sugihartono, ST
2
Asisten Structure Engineer
Muslih, ST
3
Assisten Pavement/ soil Material Eng.
Agus Pramono, ST
1

TEKNISI
Quantity Surveyor

Waktu Penempatan
Bulan

1 x 18
1x4
1 x 16
1 x 17
1 x 16
1 x 18
1 x 16
1x4
4
1x3

1 x 13
1 x 15
1 x 16

2 x 16

konstruksi
Bulan Ke
9
10
11
12

PHO
13

14

15

16

17

18

Pemel
19

Mob
No.

4
5

Uraian
Budi Margono
Slamet Solikhin
Structure Inspector
Winarto
Stevanus Setiawan, ST
Pavement & Earthwork Inspector
Yogi Aris Nugroho, amd
Nursalam
Dwi Handono, ST
Joko Sutopo
Utilitas / Mechanical & Electrical
Inspector
Juwarno
Plant Inspector
Aman Sentosa, ST

Waktu Penempatan
Bulan

2 x 16

4 x 16

1 x 16
1 x 16

konstruksi
Bulan Ke
9
10
11
12

PHO
13

14

15

16

17

18

Pemel
19

Mob
No.

Uraian

Laboratorium Technician
Abu Soleh
Edo Divta Raka, ST

Ass.Laboratorium Technician

Waktu Penempatan
Bulan
2 x 16

konstruksi
Bulan Ke
9
10
11
12

PHO
13

14

15

16

17

18

Pemel
19

4 x 16

Yuanda, ST
Wahyu Widayanto, ST
Najibatul adibah, ST
8
9

1
2
3
4
5
6
7

Joko yulianto, ST
Geodetic Surveyor u/ struktur Jembatan
to be name
Geodetic Surveyor u/ Jalan
Tanggo Rastawira, ST
TENAGA PENDUKUNG
Operator Komputer
OperatorCAD
Operator Sistem Informasi Proyek
Terpadu
Offiice Manager
Driver
Offiice Boy
Watchman/ security

1 x 16
1 x 16

2 x 17
1 x 16
1 x 16
1 x 18
5 x 18
1 x 18
1 x 18

PT. VIRAMA KARYA j

(DR.Ir. Sentot Purbos

Pemel +FHO
Bulan Ke

Keterangan
20

21

Pemel +FHO
Bulan Ke

Keterangan
20

21

Pemel +FHO
Bulan Ke

Keterangan
20

21

PT. VIRAMA KARYA jo WIDHA

(DR.Ir. Sentot Purboseno, MT)

GAMBAR 3.5
MATRIKS PEMBAGIAN TUGAS
JASA KONSULTAN PENGAWAS
PEKERJAAN PEMBANGUNAN JALAN TOL SEMARANG - SOLO TAHAP I RUAS SEMARANG - BAWEN
SEKSI II RUAS: UNGARAN-BAWEN, PAKET V. TINALUN - LEMAH IRENG (STA 18+000-STA 21+825)
No

Posisi

Nama

KODE TUGAS
A1 A2 B1 B2 B3 B4 B5 B6 B7

T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12 T13 T14 T15 T16 T17 T18 T19 T20 T21 T22 T23 T24 T25 T26

TENAGA AHLI
1

Resident / Highway Engineer

Highway Engineer

Structure Engineer

Soil & Material Engineer / Pavement

Drainage Engineer

Quantity Engineer / Document Specialist

Mechanical / Electrical Engineer

Chief Inspector

Visiting Specialist-Geotechnical

10

Visiting Specialist-Structure

11

Environmental Specialist

Keterangan :
: Tanggungjawab

A1 Overall Reviev Basic Design

T1 Project Performance

T11

: Membantu

A2 Pengukuran Topografi

T2 Quality Control

T12 Cash Flow Control

Fiscal Control

T22 Change Orders

T3 Progress Control

T13

T23 Data for As Built Drawings

B1 mobilisasi

T4 Financial Control

T 14 Traffic Management Contril

T24 As Built Drawing

B2 Pekerjaan Tanah

T5 Topographic Control

T 15 Construktion Safety Control

T25 Completion Certificate

B3 Pekerjaan Drainago

T6 Dimention Control

T16 Approval or Rejection Control

T26 Final Payment

B4 Pekerjaan Jembatan

T7 Contruction Safety Control

T17 Test Report

B5 Pekerjaan Perkerasan

T8 Materials Control

T18 Schedule Revisivitions

B6 Pekerjaan Fasilitas Jalan Tol

T9 Schedule Control

T19 Progress Payment

B7 Pekerjaan Lain-lain

T10 Quality Control

T20 Progress Payment

Project Changes Control

T21 Revised Cash Flow