Anda di halaman 1dari 6

2

CV. TRI KARYA UTAMA

Engineering Consultant
Studies, Topography, Soil Mechanic, Design & Supervisi

LAPORAN AKHIR

DAFTAR ISI

Kata Pengantar .......................................................................................... KP - i


Daftar Isi..................................................................................................... DI Daftar Tabel............................................................................................... DI - i
Daftar Gambar........................................................................................... DI BAG - 1 PENDAHULUAN.................................................... Bag. 1 - 1
1.1Latar Belakang ...................................................................... Bag.
1.2Maksud, Tujuan dan Sasaran yang Akan dicapai ...................Bag.
1.3Lokasi Pekerjaan dan Aksesbilitasnya.................................... Bag.
1.4Lingkup Kegiatan dan Metodologi.......................................... Bag.
1.5Pelaporan............................................................................... Bag.
1.6Sistematika Penyusunan Laporan...........................................Bag.

1
1
1
1
1
1

-1
-4
-6

BAG 2 GAMBARAN UMUM LOKASI PEKERJAAN..................Bag. 2 - 1


2.1Wilayah Administrasi Kabupaten Kutai Kartanegara...............Bag. 2 - 1
2.1.1 Kondisi Geografis..........................................................Bag. 2 - 1
2.1.2 Aspek Kependudukan....................................................Bag. 2 2.1.3 Kondisi Topografi...........................................................Bag. 2 2.1.4 Iklim dan Curah Hujan...................................................Bag. 2 - 4
2.1.5 Kondisi Tanah................................................................Bag. 2 2.1.6 Kondisi Perekonomian...................................................Bag. 2 - 6
2.2Deskripsi Loksi Perencanaan...................................................Bag. 2 2.2.1 Kondisi Geografis..........................................................Bag. 2 2.2.2 Aspek Kependudukan....................................................Bag. 2 2.2.3 Aspek Sosial................................................................Bag. 2 - 10
2.2.4 Aspek Pertanian, Perikanan dan Peternakan...............Bag. 2 - 1

BAG 3 KONSTRUKSI PERKERASAN KAKU (RIGID PAVEMENT)...Bag. 3


-1
3.1
3.2
3.3
3.4
3.5
3.6
3.7

Struktur dan Jenis Perkerasan Beton Semen.........................Bag. 3 - 1


Beton Semen........................................................................Bag. 3 - 2
Umur Rencana......................................................................Bag. 3 - 4
Pertumbuhan Lalu Lintas......................................................Bag. 3 Lalu Lintas Rencana..............................................................Bag. 3 Bahu...................................................................................... Bag. 3 Sambungan...........................................................................Bag. 3 3.7.1........................Memanjang Dengan Batang Pengikat (tie bars
...................................................................................... Bag. 3 -

DI - 2

Perencanaan Teknis Peningkatan Jalan Mangkurawang Dalam


Kel. Mangkurawang Kec. Tenggarong

CV. TRI KARYA UTAMA

Engineering Consultant
Studies, Topography, Soil Mechanic, Design & Supervisi

LAPORAN AKHIR
3.7.2..........................................Sambungan Pelaksanaan Melintang
...................................................................................... Bag. 3 - 8
3.7.3....................................................................Sambungan Isolasi
...................................................................................... Bag. 3 3.7.4........................................................................Pola Sambungan
.................................................................................... Bag. 3 - 11
3.7.5.................................................................Penutup Sambungan
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15

.................................................................................... Bag.
Perkerasan Beton Semen Untuk Kelandaian Curam............Bag.
Langkah Perencanaan Perkerasan Beton Semen................Bag.
Perencanaan Tulangan........................................................Bag.
Perkerasan Beton Semen Bersambung Tanpa Tulangan......Bag.
Perkerasan Beton Semen Bersambung Dengan Tulangan...Bag.
Perkerasan Beton Semen Menerus Dengan Tulangan.........Bag.
Perencanaan Lapis Tambah.................................................Bag.
Pelapisan Tambahan Perkerasan Beton Aspal di Atas
Perkerasan Beton Semen....................................................Bag.

3
3
3
3
3
3
3
3

12
1
1
1
1
1
1
1

3-1

BAG - 4 PERENCANAAN GEOMETRIK JALAN........................Bag. 4 - 1


4.1Pengukuran Topografi............................................................. Bag.
4.2Rencana Desain Geometrik Jalan............................................Bag.
4.2.1 Kecepatan Rencana......................................................Bag.
4.2.2 Alinyemen Horizontal....................................................Bag.
4.2.3 Alinyemen Vertikal........................................................Bag.
4.2.4 Gambar Desain Geometrik Jalan...................................Bag.

4
4
4
4
4
4

1
3
3
3
5
6

BAG - 5 DESAIN PERKERASAN BETON SEMEN.....................Bag. 5 - 1


5.1Struktur Perkerasan Beton Semen......................................... Bag.
5.2Tebal Plat Beton......................................................................Bag.
5.3Penulangan Plat Beton............................................................Bag.
5.3.1 Pemakaian Dowel (Doweled Contraction Joints)............Bag.

5
5
5
5

1
3
6
8

BAG - 6 VOLUME DAN BIAYA..............................................Bag. 6 - 1


6.1Volume Pekerjaan................................................................... Bag.
6.2Harga Satuan..........................................................................Bag.
6.3Rekapitulasi Biaya...................................................................Bag.
6.4Rekapitulasi Kebutuhan Peralatan...........................................Bag.
6.5Schedule Rencana Pekerjaan..................................................Bag.

6
6
6
6
6

1
1
2
2
2

BAG - 7 PENUTUP.............................................................Bag. 7 - 1
7.1Kesimpulan ........................................................................... Bag. 7 - 1
7.2Saran dan Rekomendasi..........................................................Bag. 7 - 1

LAMPIRAN
DI - 3

Perencanaan Teknis Peningkatan Jalan Mangkurawang Dalam


Kel. Mangkurawang Kec. Tenggarong

CV. TRI KARYA UTAMA

Engineering Consultant
Studies, Topography, Soil Mechanic, Design & Supervisi

LAPORAN AKHIR
Lampiran 01

Data Pengukuran Topografi

Lampiran 02

Dokumentasi Kegiatan

Lampiran 03

Engineer Estimate

Lampiran 04

Gambar Rencana

DOKUMENTASI

DAFTAR TABEL

Tabel 2.1 Luas Kecamatan di Kab. Kutai Kartanegara .......................Bag. 2 - 2


Tabel 2.2 Banyaknya Penduduk di Kab. Kutai Kartanegara ...............Bag. 2 Tabel 2.3 Luas dan Penyebaran Daerah Curah Hujan di Kabupaten
Kutai Kartanegara ..............................................................Bag. 2 Tabel 2.4 Luas Desa/Kelurahan di Kecamatan Tenggarong ...............Bag. 2 Tabel 2.5 Jumlah Penduduk di Kecamatan Tenggarong .....................Bag. 2 Tabel 3.1 Langkah-langkah Perencanaan Perkerasan Beton Semen ....Bag. 3 15
Tabel 3.2 Faktor Konversi Lapis Perkerasan Lama untuk Perencanaan Lapis
Tambahan Menggunakan Perkerasan Beton Aspal ...........Bag. 3 - 20
Tabel 4.1 ....................................Titik Koordinat dan elevasi Bench Mark (BM
Bag. 4 - 2
Tabel 4.2 ................................................Titik Awal dan Titik Akhir Pengukuran
Bag. 4 - 3
Tabel 4.3 ...........................................................Kecepatan Rencana Minimum
Bag. 4 - 3
Tabel 4.4 ......................................................Panjang Bagian Lurus Maksimum
Bag. 4 - 4

DI - 4

Perencanaan Teknis Peningkatan Jalan Mangkurawang Dalam


Kel. Mangkurawang Kec. Tenggarong

CV. TRI KARYA UTAMA

Engineering Consultant
Studies, Topography, Soil Mechanic, Design & Supervisi

LAPORAN AKHIR
Tabel 4.5 ............................................................................Jari Jari Mimimum
Bag. 4 - 4
Tabel 4.6 ..............Panjang lengkung peralihan (Ls) dan panjang pencapaian
superelevasi (Le).................................................................Bag. 4 Tabel 4.7 ....................Landai Maksimum Yang Disarankan Dan Panjang Kritis
Bag. 4 - 6
Tabel 5.1 ............Tipikal Tanah Dasar Untuk Perencanaan Tebal Taksiran Awal
Bag. 5 - 4
Tabel 5.2 ....................................Umur Rencana dan Pertumbuhan Lalu Lintas
Bag. 5 - 5
Tabel 5.3 ..................Nilai Gesekan Antara Plat Beton dan Pondasi Bawah
Bag. 5 - 7
Tabel 5.4 ..............Ukuran Diameter Dowel Berdasarkan Tebal Plat Beton
Bag. 5 - 8
Tabel 5.5 .............................................................. Volume Penulangan Rigid
Bag. 5 - 11
Tabel 6.1 ....................................................................Daftar Satuan Pekerjaan
Bag. 6 - 2
Tabel 6.2 .....................................................Rekapitulasi Kebutuhan Peralatan
Bag. 6 - 2

DAFTAR GAMBAR

Gambar 1.1

Lokasi Kecamatan Tenggarong Kabupaten Kutai Kartanegara


Bag. 1 - 3

Gambar 2.1 Peta Adminstrasi Kabupaten Kutai Kartaengara..............Bag. 2 Gambar 2.2 Peta Kecamatan Tenggarong Kab. Kutai kartaengara......Bag. 2 Gambar 3.1 Tipikal Struktur Perkerasan Beton Semen.......................Bag. 3 Gambar 3.2 Tipikal Struktur Perkerasan Beton Semen.......................Bag. 3 Gambar 3.3 Ukuran Standar Penguncian Sambungan Memanjang. . . .Bag. 3 Gambar 3.4 Sambungan Susut Melintang Tanpa Ruji.........................Bag. 3 - 8

DI - 5

Perencanaan Teknis Peningkatan Jalan Mangkurawang Dalam


Kel. Mangkurawang Kec. Tenggarong

CV. TRI KARYA UTAMA

Engineering Consultant
Studies, Topography, Soil Mechanic, Design & Supervisi

LAPORAN AKHIR
Gambar 3.5 Sambungan Susut Melintang dengan Ruji.......................Bag. 3 Gambar 3.6 Sambungan Pelaksanaan yang Direncanakan dan yang Tidak
Direncanakan Untuk Pengecoran per Lajur.....................Bag. 3 - 9
Gambar 3.7 Sambungan Pelaksanaan yang Direncanakan dan yang Tidak
Direncanakan Untuk Pengecoran seluruh Lebar Perkerasan. . .Bag.
3-9
Gambar 3.8 Contoh Persimpangan yang Membutuhkan Sambungan Isolasi
Bag. 3 - 10
Gambar 3.9a ....................................................Sambungan Isolasi dengan Ruji
Bag. 3 - 10
Gambar 3.9b .......................................................Sambungan Isolasi Tanpa Ruji
Bag. 3 - 10
Gambar 3.9c ..................................Sambungan Isolasi dengan Penebalan Tepi
Bag. 3 - 11
Gambar 3.10 ......................Detail Potongan Melintang Sambungan Perkerasan
Bag. 3 - 12
Gambar 3.11 ................................................................................. Angker Panel
Bag. 3 - 13
Gambar 3.12 ...................................................................................Angker Blok
Bag. 3 - 13
Gambar 3.13 .......................Bagan Alir Perencanaan Perkerasan Beton Semen
Bag. 3 - 14
Gambar 3.14 ...........Lapisan Peredam Retak pada Sistem Pelapisan Tambahan
Bag. 3 - 20
Gambar 4.1 ..............Pengambilan titik koordinat dengan menggunakan GPS
Bag. 4 - 1
Gambar 4.2 Pengukuran dengan Menggunakan alat Total Station (TS). . .Bag. 4
-2
Gambar 4.3 Lay Out Hasil Pengukuran...............................................Bag. 4 Gambar 4.4 Long Section Sta.0+000 Sta. 0+569,489.....................Bag. 4 Gambar 4.5 Tipikal Cross Section Tanpa Turap...................................Bag. 4 Gambar 4.6 Tipikal Cross Section Turap Eksisting..............................Bag. 4 Gambar 5.1 .....................................Tipikal Struktur Perkerasan Beton Semen
Bag. 5 - 3

DI - 6

Perencanaan Teknis Peningkatan Jalan Mangkurawang Dalam


Kel. Mangkurawang Kec. Tenggarong

CV. TRI KARYA UTAMA

Engineering Consultant
Studies, Topography, Soil Mechanic, Design & Supervisi

LAPORAN AKHIR
Gambar 5.2 Pavement Thickness Nomograph....................................Bag. 5 Gambar 5.3 Tampak Dowel Dalam Posisi Terpasang.....................Bag. 5 Gambar 5.4 Posisi Dowel Pada Sambungan...................................Bag. 5 Gambar 5.5 Detail Penulangan Rigid Pavement..........................Bag. 5 - 10
Gambar 5.6 Detail Potongan A - A Penulangan Rigid PavementBag. 5 10
Gambar 5.7 Detail Pemasangan Dowel.........................................Bag. 5 - 10

DI - 7

Perencanaan Teknis Peningkatan Jalan Mangkurawang Dalam


Kel. Mangkurawang Kec. Tenggarong

Anda mungkin juga menyukai