RENCANA ANGGARAN BIAYA PEKERJAAN PENGADAAN PEMASANGAN PERALATAN LISTRIK

Proyek : Perluasan Instalasi Listrik Kamar Tidur Anak dan Kamar Tidur Dewasa
Alamat: Jl Sek ip I/13 Tembalang Semarang
Kontraktor : Biro Teknik Listrik PT ADA Semarang
No.Item
I
1.1
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
1.1.7
1.1.8
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.3
1.3.1
1.3.2
1.3.3
1.3.4
II
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.5
2.5.1
2.5.2
2.5.3
2.5.4
2.6
2.6.1
2.6.2
2.6.3
2.6.4
2.6.5
2.6.6
2.6.7
2.6.8

Uraian Pekerjaan

Satuan

K. Tidur Anak
Pemasangan Lampu (E1)
Kotak Hubung Cross Dos
Buah
Pipa PVC " Tipe Aw
Batang (4 mtr)
2
Kabel NYM 2X1,5 mm Supreme
Meter
2
Kabel NYM 4X1,5 mm Supreme
Meter
In Bow Dos Bulat
Buah
Saklar Tunggal Plano S.T. 1GE 161 White Broco
Buah
Fitting Segi Cream 1210 Broco
Buah
Lampu Philips Tornado 15 Watt
Buah
Pemasangan Stopkontak (X1)
Pipa PVC " Tipe Aw
Batang (4 mtr)
2
Kabel NYM 3X1,5 mm Supreme
Meter
In Bow Dos Bulat
Buah
Stopkontak Plano S.K CPE 154 White Broco
Buah
Pemasangan Stopkontak (X2)
Pipa PVC " Tipe Aw
Batang (4 mtr)
2
Kabel NYM 3X1,5 mm Supreme
Meter
In Bow Dos Bulat
Buah
Stopkontak Plano S.K CPE 154 White Broco
Buah
K. Tidur Dewasa
Pemasangan Stopkontak (X3)
Pipa PVC " Tipe Aw
Batang (4 mtr)
2
Kabel NYM 3X1,5 mm Supreme
Meter
In Bow Dos Bulat
Buah
Stopkontak Plano S.K CPE 154 White Broco
Buah
Pemasangan Stopkontak (X4)
Pipa PVC " Tipe Aw
Batang (4 mtr)
2
Kabel NYM 3X1,5 mm Supreme
Meter
In Bow Dos Bulat
Buah
Stopkontak Plano S.K CPE 154 White Broco
Buah
Pemasangan Lampu (E2)
Pipa PVC " Tipe Aw
Batang (4 mtr)
2
Kabel NYM 2X1,5 mm Supreme
Meter
Kabel NYM 3X1,5 mm2 Supreme
Meter
In Bow Dos Bulat
Buah
Plano S.H. 1G 2W E163 Silver Broco
Buah
Fitting Segi Cream 1210 Broco
Buah
Lampu Philips Tornado 15 Watt
Buah
Klem Kabel Shukaku No.10
Pak (50 bh)
Harga Total Material
PEMBELIAN MATERIAL
UPAH PEKERJA

2 pekerja x 1 hari
BIAYA UTAMA

RESIKO & LABA (15%)

HARGA TENDER

Jumlah

1
0.5
5
4.5
1
1
1
1
0.5
1.5
1
1
1
10
1
1

0.5
2
1
1
2.5
7
1
1
2
6.5
9
2
2
1
1
5

ATAN LISTRIK

Harga Satuan Jumlah Harga

Rp 5.850,Rp 16.150,Rp 8.450,Rp 10.650,Rp 3.250,Rp 19.750,Rp 11.550,Rp 37.250,-

Rp 5.850,Rp 8.075,Rp 42.250,Rp 47.925,Rp 3.250,Rp 19.750,Rp 11.550,Rp 37.250,-

Rp 16.150,Rp 9.650,Rp 3.250,Rp 22.450,-

Rp 8.075,Rp 14.475,Rp 3.250,Rp 22.450,-

Rp 16.150,Rp 9.650,Rp 3.250,Rp 22.450,-

Rp 16.150,Rp 96.500,Rp 3.250,Rp 22.450,-

Rp 16.150,Rp 9.650,Rp 3.250,Rp 22.450,-

Rp 8.075,Rp 19.300,Rp 3.250,Rp 22.450,-

Rp 16.150,Rp 9.650,Rp 3.250,Rp 22.450,-

Rp 40.375,Rp 67.550,Rp 3.250,Rp 22.450,-

Rp 16.150,Rp 8.450,Rp 9.650,Rp 3.250,Rp 30.550,Rp 11.550,Rp 37.250,Rp10,550

Rp 32.300,Rp 54.925,Rp 86.850,Rp 6.500,Rp 30.550,Rp 11.550,Rp 37.250,Rp 52.750,Rp 861.875,-

Rp 861.875,Rp 400.000,- +
Rp 1.261.875,Rp 189.255,- +

Rp 1.451.100,-

MERK
PVC TIPE AW "
CROSS DOS
SUPREME
SUPREME
PLANO S.T. 1GE 161 WHITE BROCO
GOLD STAR 14 W

Batang (4
Buah
Meter
Meter
Buah
Set

PLANO S.K CPE 154 WHITE BROCO


PRESTO
SCHNEIDER DOMAE 2A

Buah
Buah
Buah

Pipa PVC " Tipe Aw


Kabel NYM 2X1,5 mm2 Supreme
Kabel NYM 3X1,5 mm2 Supreme
In Bow Dos

Batang (4 Met
Meter
Meter
Buah

PEMBELIAN MATERIAL
UPAH PEKERJA

ESTIMASI BIAYA

PEMBELIAN M
UPAH PEKE

RESIKO & LAB

5
1
7
15
1
1

Rp
Rp
Rp
Rp
Rp
Rp

16.150,5.850,8.450,9.650,19.750,30.550,-

2 Rp 22.450,1 Rp 31.450,1 Rp 50.900,-

ng (4 Meter)

Rp
Rp
Rp
Rp
Rp
Rp

80.750,5.850,59.150,144.750,19.750,30.550,-

Rp 44.900,Rp 31.450,Rp 50.900,-

Rp 16.150,- Rp 32.300,Rp 8.450,- Rp 59.150,Rp 9.650,- Rp 28.950,- Rp 458.050,Rp 3.250,- Rp 3.250,-

Rp 458.050,1 HARI/PEK Rp 200.000,- +


BIAYA UT Rp 658.050,RESIKO & L Rp 131.600,- +
HARGA TERp 789.650,-

BELIAN MATERIAL
1 HARI/PEKERJA
BIAYA UTAMA
KO & LABA (20%)
HARGA TENDER

Rp 531.500,Rp 200.000,+
Rp 731.500,Rp 146.300+
Rp 877.800,-