REKAPITULASI

No.

KEGIATAN

: TUGAS DESAIN MATA KULIAH ESTIMASI BIAYA

PEKERJAAN

: PERENCANAAN PEMBANGUNAN RUMAH TINGGAL


TIPE 208/500

ITEM PEKERJAAN
I. PEKERJAAN PERMULAAN.... Rp.
II. PEKERJAAN PONDASI... Rp.
III. PEKERJAAN BETON / DINDING......
Rp.
IV. PEKERJAAN KAP / ATAP.. Rp.
V. PEKERJAAN PLAFOND
Rp.
VI. PEKERJAAN PLESTERAN Rp.
VII. PEKERJAAN LANTAI Rp.
VIII. PEKERJAAN PINTU / JENDELA
Rp.
IX. PEKERJAAN PENGECATAN Rp.
X. PEKERJAAN PERLENGKAPAN DALAM Rp.
XI. PEKERJAAN PERLENGKAPAN LUAR Rp.
JUMLAH
Rp.
PPN (10%)
Rp.
TOTAL JUMLAH + PPN
Rp.
TOTAL ANGGARAN
Rp.
Terbilang:
Tujuh ratus empat puluh sembilan juta enam puluh ribu rupiah.

BIAYA
BOBOT (%)
5,258,881.00
0.59
67,169,932.55
7.55
332,937,407.40
37.41
102,058,657.95
11.47
39,517,065.00
4.44
57,235,241.06
6.43
84,721,442.87
9.52
36,628,634.80
4.12
64,299,080.96
7.22
73,085,130.50
8.21
27,052,394.40
3.04
889,963,868.49
88,996,386.85
978,960,255.34
749,060,000.00

NO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
NO
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

BAHAN
II. BAHAN-BAHAN.
Kerikil cor
Pasir cor
Pasir pasang
Pasir urug
Tanah urug
Batu bata
Kayu Klas I
Kayu Klas II
Kayu Kelas III
Semen Tipe I
Semen Putih
Keramik uk. 20x20 cm
Keramik 25x25 cm
Keramik uk. 60x60 cm
Bon bon Keramik
Genteng Metal
Perabung Genteng Metal
Kunci Tanam UNION 2 x slagh
Kunci bulat
Engsel Nylon Pintu
Engsel Nylon Jendela
Grendel Pintu
Grendel Jendela
Hak Angin Jendela
Tangan-tangan Jendela
Kaca bening tebal 5 mm
Kaca RayBen tebal 5 mm
Besi Beton 12
Besi Beton 8
Kawat beton
Gypsum 6mm
Paku Atap
Paku kayu
Paku Triplek
Cat Minyak setara Platon
BAHAN
Cat Tembok (cat air)
Cat Dasar
Menie Kayu / Besi
Thinner
Plamur tembok
Dempul jadi
Politur
Residu
Amplas kayu
Pipa Air PVC 1/2"
Pipa PVC 3/4"
Pipa PVC 1"
Pipa PVC 2"
Pipa PVC 3"
Pipa PVC 4"

SATUAN

HARGA STN
( Rp )

M
M
M
M
M
Buah
M
M
M
Zak
Kg
M
M
M
M'
Lbr
Lbr
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
M
M
Kg
Kg
Kg
M2
Kg
Kg
Kg
Kg
SATUAN

300,000
220,000
155,000
130,000
85,000
500
6,500,000
3,500,000
2,100,000
90,000
5,000
98,000
55,000
250,000
15,000
55,000
26,750
110,000
75,000
55,000
40,000
25,000
20,000
25,000
30,250
100,000
150,000
21,000
17,000
20,000
95,000
30,000
23,000
19,000
75,000
HARGA STN
( Rp )
65,000
25,000
25,000
27,600
5,000
26,000
45,000
17,000
5,000
5,000
6,450
25,000
35,000
57,000
76,000

Kg
Kg
Lt
Lt
Kg
Kg
Ltr
Kg
Lbr
m
m
m
m
m
m

KETERANGAN

KETERANGAN

DAFTAR ANALISA PEKERJAAN

NO
U RAIAN
H. SATUAN
1 Pembersihan Lapangan / 10 m2.
0.750 Pekerja
Rp.
75,000.00 Rp.
0.025 Mandor
Rp.
85,000.00 Rp.
Rp.
Untuk 1 m2 = 1/10 x
Dibulatkan
2 Pasangan Bouwplank / 10 m'
0.800 Tukang Kayu
Rp.
70,000.00 Rp.
0.280 Pekerja
Rp.
75,000.00 Rp.
0.090 M3 Papan Kls III
Rp. 2,100,000.00
13.500 M' Tiang Pancang
Rp.
6,000.00
0.100 Kg Paku kayu
Rp.
23,000.00
Rp.
Untuk 1 m' = 1/10 x
Dibulatkan
3

Galian Tanah Biasa - Anal . A.1 /m3.


0.750 Pekerja
Rp.

75,000.00 Rp.
Rp.

UPAH

BAHAN

56,250.00
2,125.00
58,375.00

56,000.00
21,000.00
Rp.
Rp.
Rp
77,000.00 Rp

189,000.00
81,000.00
2,300.00
272,300.00

56,250.00
56,250.00

Dibulatkan
4 Pemasangan cerocok dia 15 - 200 cm / titik
0.003 Pekerja
Rp.
75,000.00
0.02 Tukang
Rp.
70,000.00
0.01 Mandor
Rp.
85,000.00
2.2 M' Kayu cerocok
Rp.
7,000.00

Stamp beton 1:3:5 - Anal.G.43-B /m3


6.000 Pekerja
Rp.
0.500 Tukang Batu
Rp.
4.752 Zak Semen
Rp.
0.570 M3 Pasir Cor
Rp.
0.950 M3 Kerikil
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

225.00
1,400.00
850.00

75,000.00 Rp.
70,000.00 Rp.
90,000.00
220,000.00
300,000.00
Rp.

450,000.00
35,000.00

Rp.
2,475.00 Rp.

15,400.00
15,400.00

Rp.
Rp.
Rp.
485,000.00 Rp.

427,680.00
125,400.00
285,000.00
838,080.00

Cetakan beton - Anal. F. 8 / 10 m2. Untuk 1 m3 beton bertulang


5.000 Tukang Kayu
Rp.
70,000.00 Rp.
350,000.00
2.000 Pekerja
Rp.
75,000.00 Rp.
150,000.00
4.000 Kg Paku Kayu
Rp.
23,000.00 Rp.
Rp.
0.150 M3 Kayu kelas III
Rp. 2,100,000.00
Rp.
Rp.
500,000.00
Upah 50 %
Rp.
250,000.00 Rp.
Dibulatkan

92,000.00
315,000.00

Dibulatkan
6

Pekerjaan besi kasar/rangka beton - Anal. I.2 /100 kg

407,000.00

4.500
4.500
110.000
2.000

Tukang besi
Pekerja
Kg Besi Beton
Kg Kawat Beton

Rp.
Rp.
Rp.
Rp.

70,000.00 Rp.
75,000.00 Rp.
21,000.00
20,000.00
Rp.

315,000.00
337,500.00
Rp.
Rp.
652,500.00 Rp.

2,310,000.00
40,000.00
2,350,000.00

Rp.
Rp.
Rp.

250,000.00
228,240.00
62,930.00

105,000.00
337,500.00
442,500.00 Rp.

541,170.00

Rp.
Rp.
Rp.

250,000.00
370,800.00
51,615.00

140,000.00
450,000.00
590,000.00 Rp

672,415.00

Dibulatkan

Pasangan batu bata 1:4 Anal,G.32.A /m3


500.000 Bh Batu bata
Rp.
500.00
2.536 Zak semen
Rp.
90,000.00
0.406 M3 Pasir pasang
Rp.
155,000.00
1.500 Tukang batu
Rp.
70,000.00 Rp.
4.500 Pekerja
Rp.
75,000.00 Rp.
Rp.
Dibulatkan
Pasangan batu bata 1:2 Anal,G.32. M /m3
500.000 Bh Batu bata
Rp.
500.00
4.120 Zak semen
Rp.
90,000.00
0.333 M3 Pasir pasang
Rp.
155,000.00
2.000 Tukang batu
Rp.
70,000.00 Rp.
6.000 Pekerja
Rp.
75,000.00 Rp.
Rp.
Dibulatkan

10 Beton Bertulang Praktis - Anal.Supl.V/m3 Besi 210 kg


1.000 Beton Anal G.43.B
Rp.
1.400 Cetakan Beton F.8
Rp.
1.500 Rangka Besi Anal. 1.2
Rp.

1,323,080.00
657,000.00
3,002,500.00

Dibulatkan
11 Beton Struktur K. 225- 1:1,5:2,5 - Anal G.41.A/m3
6.000 Pekerja
Rp.
75,000.00
0.300 Mandor
Rp.
85,000.00
1.000 Tukang Batu
Rp.
70,000.00
0.100 Kep tkg Batu
Rp.
80,000.00
7.260 Zak semen
Rp.
90,000.00
0.570 M3 Pasir Cor
Rp.
220,000.00
0.900 M3 kerikil
Rp.
300,000.00
1.400 Cetakan Beton F.8
Rp.
657,000.00
1.500 Rangka Besi Anal.12
Rp. 3,002,500.00

Rp.
Rp.
Rp.
Rp.

Rp.
Dibulatkan
12 Upah Plesteran tebal 15 mm- Anal. G.47/m2

450,000.00
25,500.00
70,000.00
8,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
553,500.00 Rp.

653,400.000
125,400.000
270,000.000
919,800.000
4,503,750.000
6,472,350.000

0.400 Pekerja
0.200 Tukang Batu

Rp.
Rp.

75,000.00 Rp.
70,000.00 Rp.
Rp.

30,000.00
14,000.00
44,000.00

Dibulatkan
13 Plesteran tebal 15 mm 1:2 - Anal. G.50.K/m2
0.230 Zak Semen
Rp.
90,000.00
0.013 M3 Pasir Pasang
Rp.
155,000.00
Upah Anal G.47
Rp.
44,000.00 Rp.
Rp.
Dibulatkan

Rp.
Rp.

20,700.00
2,015.00

44,000.00
44,000.00 Rp.

22,715.00

Rp.
Rp.

14,310.00
3,255.00

44,000.00
44,000.00 Rp.

17,565.00

90,000.00
155,000.00

Rp.
Rp.
Rp.

1,123,920.00
147,250.00
1,271,170.00

90,000.00
155,000.00

Rp.
Rp.
Rp.

693,360.00
179,800.00
873,160.00

7,000.00
15,000.00
12,711.70 Rp.
Rp.
Rp.
34,711.70 Rp.

12,711.70
55,000.00
400.00
55,400.00

13 Plesteran tebal 15 mm 1:4 - Anal. G.50 Q/m2


0.159 Zak Semen
Rp.
90,000.00
0.021 M3 Pasir Pasang
Rp.
155,000.00
Upah Anal G.47
Rp.
44,000.00
Rp.
Rp.
Dibulatkan
14 Spesi Adukan 1:2 -Anal. G.14/m3
12.488 Zak Semen
Rp.
0.950 M3 Pasir Pasang
Rp.
Dibulatkan

15 Spesi Adukan 1:4 -Anal. G.19/m3


7.704 Zak Semen
Rp.
1.160 M3 Pasir Pasang
Rp.
Dibulatkan

17 Pas. Dinding Keramik uk. 25 x 25 cm - Supl.IV/m2


0.100 Tukang batu
Rp.
70,000.00 Rp.
0.200 Pekerja
Rp.
75,000.00 Rp.
0.010 M3 Spesi 1:4/G.14
Rp. 1,271,170.00
1.000 M2 Keramik uk.25x25 Rp.
55,000.00
0.080 Kg Semen putih
Rp.
5,000.00
Rp.
Dibulatkan
18 Urugan tanah di bawah lantai - Anal. A.18.a/m3
0.300 Pekerja
Rp.
75,000.00 Rp.
1.200 M3 Tanah Urug
Rp.
85,000.00
Rp.
Dibulatkan
19 Urugan pasir di bawah lantai - Anal. A.18.b/m3

22,500.00
Rp.
22,500.00 Rp.

102,000.00
102,000.00

0.300 Pekerja
1.200 M3 Pasir Urug

Rp.
Rp.

75,000.00 Rp.
130,000.00
Rp.

22,500.00
Rp.
22,500.00 Rp.

156,000.00
156,000.00

Dibulatkan
20 Pas. Lantai Keramik uk. 25 x 25 cm - Supl.III. b/m2
0.100 Tukang batu
Rp.
70,000.00 Rp.
0.200 Pekerja
Rp.
75,000.00 Rp.
0.010 M3 Spesi 1:4/G.19
Rp.
873,160.00
1.000 M2 Keramik uk.25x25 Rp.
55,000.00
0.016 Zak Semen
Rp.
90,000.00
Rp.
Upah Pelaksanaan 80%
Rp.
Dibulatkan
21 Pas. Lantai Keramik uk. 60 x 60 cm - Supl.III. c/m2
0.100 Tukang batu
Rp.
70,000.00 Rp.
0.200 Pekerja
Rp.
75,000.00 Rp.
0.010 M3 Spesi 1:4/G.19
Rp.
873,160.00
1.000 M2 Keramik uk.30x30 Rp.
250,000.00
0.016 Zak Semen
Rp.
90,000.00
Rp.
Upah Pelaksanaan 60%
Rp.
Dibulatkan
22 Pas. Meja Beton Lapis Keramik 20 x 20
0.100 Tukang Batu
Rp.
70,000.00 Rp.
0.200 Pekerja
Rp.
75,000.00 Rp.
1.000 M2 Keramik 20X20
Rp.
55,000.00
0.016 Zak Semen
Rp.
90,000.00
110.000 Kg Besi Beton
Rp.
21,000.00
2.000 Kg Kawat Beton
Rp.
20,000.00
500.000 Bh Batu Bata
Rp.
500.00
0.010 M3 Spesi 1:4/G.19
Rp.
873,160.00
Rp.
Dibulatkan

23 Mengerjakan Kayu Kusen-Anal. F27 /m3


36.000 Tukang Kayu
Rp.
70,000.00 Rp.
12.000 Pekerja
Rp.
75,000.00 Rp.
1.100 M3 Kayu Klas I

Rp.

6,500,000.00

7,000.00
15,000.00
Rp.
Rp.
Rp.

8,731.60
55,000.00
1,440.00

22,000.00
17,600.00 Rp.

65,171.60

7,000.00
15,000.00
Rp.
Rp.
Rp.

8,731.60
250,000.00
1,440.00

22,000.00
13,200.00 Rp

260,171.60

7,000.00
15,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,000.00 Rp.

55,000.00
1,440.00
2,310,000.00
40,000.00
250,000.00
8,731.60
2,665,171.60

2,520,000.00
900,000.00
Rp.

7,150,000.00

Rp. 3,420,000.00
Upah Pelaksanaan 50 %
Rp. 1,710,000.00
Dibulatkan
24 Pas. Pintu Panil Papan - Anal. F.33 /m2
7.500 Tukang Kayu
Rp.
70,000.00 Rp.
525,000.00
2.500 Pekerja
Rp.
75,000.00 Rp.
187,500.00
0.035 M3 Kayu Klas II
Rp. 3,500,000.00
0.200 Kg Paku Kayu
Rp.
23,000.00
Rp.
712,500.00
Upah Pelaksanaan 50 %
Rp.
356,250.00
Dibulatkan
25 Pas. Pintu Rangka Kaca/ Jendela Rangka Kaca 5 mm-Anal.F.36 /m2
6.000 Tukang Kayu
Rp.
70,000.00 Rp.
420,000.00
2.000 Pekerja
Rp.
75,000.00 Rp.
150,000.00
0.035 M3 Kayu Klas II
Rp. 3,500,000.00
0.900 M2 Kaca Tebal 5 mm Rp.
150,000.00
Rp.
570,000.00
Upah Pelaksanaan 20 %
Rp.
114,000.00
Dibulatkan
26 Mengerjakan Kuda Kuda Kayu-Anal. F22 /m3
24.000 Tukang Kayu
Rp.
70,000.00
2.400 Kep tukang kayu
Rp.
75,000.00
8.000 Pekerja
Rp.
75,000.00
0.400 Mandor
Rp.
85,000.00
1.100 M3 Kayu kelas II
Rp. 3,500,000.00
9.000 Kg. Paku Kayu
Rp.
23,000.00
Upah Pelaksanaan 50 %
Dibulatkan

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

27 Mengerjakan rangka atap genteng metal-Analisa F16/m2


0.100 Tukang Kayu
Rp.
70,000.00 Rp.
0.010 Kep tukang kayu
Rp.
80,000.00 Rp.
0.100 Pekerja
Rp.
75,000.00 Rp.
0.050 Mandor
Rp.
85,000.00 Rp.
0.017 M3 Kayu kelas II
3,500,000.00
0.25 Kg. Paku Kayu
23,000.00
Rp.
Upah Pelaksanaan 125 %
Rp.
Dibulatkan
28 Memasang Atap Genteng Metal-Anal. H.3/m2
0.100 Tukang Kayu
Rp.
70,000.00
0.010 Kep tukang kayu
Rp.
80,000.00
0.200 Pekerja
Rp.
75,000.00
0.010 Mandor
Rp.
85,000.00
1.000 M2 Genteng Metal
Rp.
110,000.00
0.020 Kg. Paku Genteng
Rp.
30,000.00

Rp.

7,150,000.00

Rp.
Rp.

122,500.00
4,600.00

Rp.

127,100.00

Rp.
Rp.

122,500.00
135,000.00

Rp.

257,500.00

Rp.
Rp.

3,850,000.00
207,000.00

2,494,000.00
1,247,000.00 Rp.

4,057,000.00

1,680,000.00
180,000.00
600,000.00
34,000.00

7,000.00
800.00
7,500.00
4,250.00
Rp.
Rp.

59,500.00
5,750.00

19,550.00
24,437.50 Rp.

65,250.00

Rp.
Rp.
Rp.
Rp.

7,000.00
800.00
15,000.00
850.00

Rp.

Rp.
Rp.
23,650.00 Rp.

Dibulatkan
29 Memasang Perabung Atap Genteng Metal Anal-H,10 /10m'
0.250 Tukang Kayu
Rp.
70,000.00 Rp.
0.025 Kep tukang kayu
Rp.
80,000.00 Rp.

17,500.00
2,000.00

110,000.00
600.00
110,600.00

0.250
0.025
1.000
0.040

Pekerja
Mandor
M' Perabung gtg Metal
Kg. Paku Genteng

Rp.
Rp.
Rp.
Rp.

75,000.00 Rp.
85,000.00 Rp.
75,000.00
30,000.00
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

95,000
19,000.00
75,000.00
85,000.00
70,000.00
80,000.00

18,750.00
2,125.00
Rp.
Rp.
40,375.00 Rp.

75,000.00
1,200.00
76,200.00

Rp.
Rp.

104,500.00
380.00

Untuk 1 m' = 1/10 x


Dibulatkan

30 Plafond Gypsum 6mm /m2


1.1000 M2 Gypsum 6mm
0.0200 Kg Paku
0.4000 Pekerja
0.0010 Mandor
0.5000 Tukang
0.0010 Kepala Tukang

31 Pas. Rangka Plafond - Anal. F.1 /m


0.100 Tukang Kayu
Rp.
0.050 Kepala tukang
Rp.
0.100 Pekerja
Rp.
0.050 Mandor
Rp.
0.014 M3 Kayu Klas III
Rp.
0.200 Kg Paku Kayu
Rp.

70,000.00
80,000.00
75,000.00
85,000.00
2,100,000.00
23,000.00

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Upah Pelaksanaan 50 %
Rp.
Dibulatkan
32 Mencat Tembok 1x Plamur + 2x cat Warna-Anal.K.3+K.26/m2
0.160 Kg Plamur
Rp.
5,000.00
0.313 Kg Cat Tembok
Rp.
65,000.00
0.200 Hl Amplas
Rp.
5,000
0.300 Tukang Cat
Rp.
70,000.00 Rp.
0.150 Pekerja
Rp.
75,000.00 Rp.
Rp.
Dibulatkan
33 Mencat Tembok 2x cat Warna-Anal.K.26/m2
0.313 Kg Cat Tembok
Rp.
65,000.00
0.200 Tukang Cat
Rp.
70,000.00 Rp.
0.100 Pekerja
Rp.
75,000.00 Rp.
Rp.
Dibulatkan

30,000.00
85.00
35,000.00
80.00
65,165.00

104,880.00

7,000.00
4,000.00
7,500.00
4,250.00
Rp.
Rp.

29,400.00
4,600.00

22,750.00
11,375.00 Rp.

34,000.00

Rp.
Rp.
Rp.

800.00
20,345.00
1,000.00

21,000.00
11,250.00
32,250.00 Rp.

22,145.00

Rp.
14,000.00
7,500.00
21,500.00 Rp.

34 Mencat Kayu 1 x dasar + 2 x cat warna + mendempul - Anal.K.9+K.25+K.30/10 m2


0.800 Kg Dempul
Rp.
26,000.00
Rp.
0.770 Thinner
Rp.
27,600.00
Rp.
2.000 Lbr Amplas
Rp.
5,000.00
Rp.
1.420 Kg cat dasar
Rp.
25,000.00
Rp.
2.840 Kg cat Warna
Rp.
75,000.00
Rp.
2.000 Tukang cat
Rp.
70,000.00 Rp.
140,000.00
Rp.
140,000.00 Rp.

20,345.00

20,345.00

20,800.00
21,252.00
10,000.00
35,500.00
213,000.00
300,552.00

Untuk mendempul dan mengampelas


0.400 Tukang cat
Rp.

70,000.00 Rp.
Rp.

28,000.00
168,000.00 Rp.

300,552.00

Untuk 1 m2= 1/10 x


Dibulatkan
35 Mempolitur Kayu 2 x jalan + mendempul - Anal.K.25+K.30/10 m2
0.800 Kg Dempul
Rp.
26,000.00
2.000 Lbr Amplas
Rp.
5,000.00
3.550 Klg Politur
Rp.
45,000.00
2.000 Tukang cat
Rp.
70,000.00 Rp.
140,000.00
Rp.
140,000.00
Untuk mendempul dan mengamplas
0.400 Tukang cat
Rp.
70,000.00 Rp.
28,000.00
Rp.
168,000.00
Untuk 1 m2= 1/10 x
Dibulatkan

36 Lisplank Papan 3/25 cm, 1 M' Anl. P


0.003 M3 Kayu Klas II
Rp.
0.010 Kg. Paku Kayu
Rp.
0.200 Tukang Kayu
Rp.
0.020 Kep tukang kayu
Rp.
0.070 Pekerja
Rp.
0.003 Mandor
Rp.

3,500,000.00
23,000.00
70,000.00
80,000.00
75,000.00
85,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

20,800.00
10,000.00
159,750.00

Rp.

190,550.00

Rp.

190,550.00

Rp.
Rp.

10,500.00
230.00

14,000.00
1,600.00
5,250.00
255.00
21,105.00 Rp.

10,730.00

Dibulatkan
37 Saluran Keliling Bangunan - Anal. Supl. V/m'
0.120 Galian Tanah A.1
Rp.
56,250.00 Rp.
0.020 Timbunan Pasir
Rp.
178,500.00 Rp.
0.100 Beton Anal G.43.B
Rp. 1,323,080.00
0.050 Pas. Batu Bata 1 : 2
Rp. 1,271,170.00
0.600 Plesteran Spesi 1 :2
Rp.
66,715.00
Rp.
38

Beton 1:2:3 - Anal.G.41 /m3


6.000 Pekerja
1.000 Tukang Batu
6.800 Zak Semen
0.540 M3 Pasir Cor
0.830 M3 Kerikil
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00 Rp.
70,000.00 Rp.
90,000.00
220,000.00
300,000.00
Rp.

6,750.00
3,570.00
Rp.
Rp.
Rp.
10,320.00 Rp

132,308.00
63,558.50
40,029.00
235,895.50

450,000.00
70,000.00
Rp.
Rp.
Rp.
520,000.00 Rp.

612,000.00
118,800.00
249,000.00
979,800.00

TAR ANALISA PEKERJAAN

JUMLAH

Rp.
Rp.
Rp.

58,375.00
5,837.50
5,835.00

Rp.
Rp.
Rp.

349,300.00
34,930.00
34,930.00

Rp.
Rp.

56,250.00
56,250.00

Rp.
Rp.

20,350.00
20,350.00

Rp.
Rp.

1,323,080.00
1,323,080.00

Rp.
Rp.

657,000.00
657,000.00

Rp.
Rp.

3,002,500.00
3,002,500.00

Rp.
Rp.

983,670.00
983,670.00

Rp.
Rp.

1,262,415.00
1,262,415.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,323,080.00
919,800.00
4,503,750.00
6,746,630.00
6,746,630.00

Rp.
Rp.

7,025,850.00
7,025,850.00

Rp.
Rp.

44,000.00
44,000.00

Rp.
Rp.

66,715.00
66,715.00

Rp.
Rp.

61,565.00
61,565.00

Rp.
Rp.

1,271,170.00
1,271,170.00

Rp.
Rp.

873,160.00
873,160.00

Rp.
Rp.

90,111.70
90,110.00

Rp.
Rp.

124,500.00
124,500.00

Rp.
Rp.

178,500.00
178,500.00

Rp.
Rp.

82,771.60
82,770.00

Rp.
Rp.

273,371.60
273,370.00

Rp.
Rp.

2,687,171.60
2,687,170.00

Rp.
Rp.

8,860,000.00
8,860,000.00

Rp.
Rp.

483,350.00
483,350.00

Rp.
Rp.

371,500.00
371,500.00

Rp.
Rp.

5,304,000.00
5,304,000.00

Rp.
Rp.

89,687.50
89,685.00

Rp.
Rp.

134,250.00
134,250.00

Rp.
Rp.
Rp.

116,575.00
11,657.50
11,657.00

Rp.

170,045.00

Rp.
Rp.

45,375.00
45,375.00

Rp.
Rp.

54,395.00
54,395.00

Rp.
Rp.

41,845.00
41,845.00

Rp.
Rp.
Rp.

468,552.00
46,855.20
46,855.00

Rp.
Rp.
Rp.

358,550.00
35,855.00
35,855.00

Rp.
Rp.

31,835.00
31,835.00

Rp.
Rp

246,215.50
246,215.00

Rp.
Rp.

1,499,800.00
1,499,800.00

RENCANA ANGGARAN BIAYA.

NO
I.

KEGIATAN

TUGAS DESAIN MATA KULIAH ESTIMASI BIAYA

PEKERJAAN

: PERENCANAAN PEMBANGUNAN RUMAH TINGGAL TIPE 208/500

URAIAN PEKERJAAN
PEKERJAAN PERMULAAN
1. Pembersihan Lapangan
a Pembersihan Lokasi
b Pas. Bowplank

II. PEKERJAAN PONDASI


2. Pekerjaan Galian
a.Galian Tanah
b.Timbunan kembali 1/4 galian
3. Pekerjaan Pondasi
a Urugan pasir dipadatkan
b Pas. Lantai kerja 1 : 3 : 5
c. Pas. Pondasi Batu Bata 1 : 2
d. Pas. Pondasi Plat Setempat
e. Plesteran Pondasi batu bata 1:2
f. Pak. Cerocok kayu
III.

PEKERJAAN BETON / DINDING


4. Pekerjaan Beton Bertulang
a. Pas. Sloof 15/50
b. Pas. Sloof 15/20
c. Pas. Sloof 10/40
d. Pas. Sloof 15/40
e. Pas. Sloof 15/30
f. Pas. Balok 15/20
g. Pas. Ring balok 15/20
h. Pas.Kolom 15/15
i. Pas.Kolom 15/20
j. Pas.Kolom 15/25
k. Pas.Kolom Sudut
l. Pas.Kolom 15/30
m Pas.Kolom 25/40
n Pas.Tangga beton
o Pas.Tiang Teras
p Plat cantilever
q Pegangan tangga
r Plat lantai 12 cm
5. Pekerjaan Kozen Pintu/Jendela
a Pas. Kozen Kayu
b Pas. Angker Kozen

VOLUME

HARGA STN

JUMLAH STN

(Rp.)

(Rp.)

493.00 M
68.20 M'

5,835.00
34,930.00

2,876,655.00
2,382,226.00

51.78 M
12.95 M

56,250.00
56,250.00

2,912,892.19
728,223.05

2.62
2.62
12.84
4.23
102.72
333.80

M
M
M
M
M
btg

178,500.00
1,323,080.00
1,262,415.00
7,025,850.00
66,715.00
20,350.00

466,889.06
3,460,681.13
16,209,408.60
29,746,043.73
6,852,964.80
6,792,830.00

0.32
2.07
0.08
1.38
1.89
1.54
3.62
2.13
2.03
2.05
1.83
0.36
1.20
4.55
0.49
3.03
1.00
6.25

M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Ls
M

7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
6,746,630.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
6,746,630.00
6,746,630.00
10,000,000.00
7,025,850.00

2,239,489.69
14,509,785.42
533,964.60
9,687,241.98
13,272,533.24
10,835,968.46
24,445,739.14
14,943,982.95
14,280,040.13
14,395,966.65
12,852,036.11
2,529,306.00
8,431,020.00
31,944,065.09
3,305,848.70
20,456,018.29
10,000,000.00
43,937,206.85

1.34 M
68.02 kg

8,860,000.00
8,500.00

11,890,164.30
578,161.50

c Neut
6. Pekerjaan Dinding
a Pas. Dinding Bata 1 : 2
b Pas. Dinding Bata 1 : 4

28.00 Bh

12,000.00

336,000.00

8.69 M
57.50 M

1,262,415.00
983,670.00

10,973,589.73
56,559,278.58

NO
IV.

URAIAN PEKERJAAN
PEKERJAAN KAP/ATAP
7. Pekerjaan Kuda - Kuda/ Kap
a Pas. Kuda kuda , Gording , Kasau
b Angkur Kuda-kuda

JUMLAH STN

(Rp.)

(Rp.)

5,304,000.00
8,000.00

21,055,349.35
230,048.00

275.00 M
86.56 M'

134,250.00
31,835.00

36,918,750.00
2,755,637.60

24.51 M'
81.56 M'
16.13 M'

11,657.00
11,657.00
11,657.00

285,713.07
950,744.92
188,027.41

PEKERJAAN PLAFOND
9. Pekerjaan Rangka Plafond
a Pas. Rangka Plafond

263.00 M

45,375.00

11,933,625.00

10. Pekerjaan Plafond


a Pas. Gypsum 6 mm

263.00 M

104,880.00

27,583,440.00

PEKERJAAN PLESTERAN
11. Pekerjaan Plesteran
a Pek. Plesteran Dinding 1:2
b Pek. Plesteran Dinding 1:4
c Pas. Dinding keramik uk. 25x25 cm

115.90 M
766.64 M
25.58 M

66,715.00
61,565.00
90,110.00

7,732,301.86
47,198,375.96
2,304,563.25

M
M
M
M
M

1,323,080.00
273,370.00
82,770.00
124,500.00
178,500.00

16,645,468.37
52,477,813.76
1,298,454.38
12,334,735.16
1,964,971.20

34.93 M
9.19 M
18.31 M

483,350.00
371,500.00
550,000.00

16,885,230.00
3,413,044.80
10,067,860.00

9.00
54.00
20.00
20.00
10.00
20.00
4.00

110,000.00
55,000.00
40,000.00
20,000.00
30,250.00
25,000.00
75,000.00

990,000.00
2,970,000.00
800,000.00
400,000.00
302,500.00
500,000.00
300,000.00

c Pas.Jurai Dalam
d Pas.Jurai Luar
e Pas.Perabung

VI.

HARGA STN

3.97 M
28.76 kg

8. Pekerjaan Atap
a Pas. Atap Genteng Metal
b Pas. Lisplank Papan

V.

VOLUME

VII. PEKERJAAN LANTAI


12. Pekerjaan Lantai
a Cor Beton Lantai 1:3:5
b Pas. Lantai Keramik uk 60x60 cm
c Pas. Lantai Keramik uk. 25x 25 cm
d Urugan Tanah
e Urugan Pasir
VIII. PEKERJAAN PINTU/JENDELA
13. Pek. Pintu/ Jendela
a Pintu Panil Papan
b Jendela Rangka Kaca 5mm
c Pas. Terali besi
14. Alat Penggantung/ Pengunci
a Pas. Kunci Tanam Union 2 x Slagh
c Pas. Engsel Nylon Pintu
d Pas. Engsel Nylon Jendela
e Pas. Grendel Jendela
f Pas. Handle jendela
g Pas. Hak angin
h Pas. Kunci Bulat

12.58
191.97
15.69
99.07
11.01

Bh
Bh
Bh
Bh
Bh
Bh
Bh

IX.

PEKERJAAN PENGECATAN
15. Pekerjaan Pengecatan
a Mencat kayu kozen dan jendela
b Mencat plafond Gypsum

28.16 M
263.00 M

46,855.00
46,855.00

1,319,499.33
12,322,865.00

NO

URAIAN PEKERJAAN

VOLUME

e Mencat Lisplank Papan dg cat Minyak


f Mencat pintu Panil dg cat minyak
g Mencat Dinding tembok dg cat air

21.64 M
34.93 M
882.54 M

HARGA STN

JUMLAH STN

(Rp.)

X.

1,013,942.20
1,636,821.04
48,005,953.38

PEKERJAAN PERLENGKAPAN DALAM


16. Pekerjaan Instalasi Listrik
a Pas. Instalasi Listrik
b Pas.Gantung Lampu Hias
c Pas. Lampu Energy Saver 20 Watt
d Pas. Lampu Energy Saver 14 Watt
e Lampu down light
f Pas. Instalasi Stop Kontak
g Pas. AC 1PK
h Saklar tunggal
i Saklar ganda
j Saklar triple

85.00
3.00
7.00
33.00
18.00
27.00
6.00
8.00
5.00
6.00

Ttk
Bh
Bh
Bh
Bh
Ttk
bh
bh
bh
bh

220,000
1,000,000
35,000
180,000
60,000
170,000
2,500,000
25,000
33,000
45,000

18,700,000.00
3,000,000.00
245,000.00
5,940,000.00
1,080,000.00
4,590,000.00
15,000,000.00
200,000.00
165,000.00
270,000.00

17. Pekerjaan Instalasi Air


a Pas. Saluran PVC 4"
b Pas. Pipa Air Bersih PVC "
d Pas. Saringan Lantai / Floor Drain
e Pompa air

22.57
29.64
3.00
1.00

M'
M'
Bh
Bh

76,000
6,450
350,000
2,500,000

1,715,320.00
191,178.00
1,050,000.00
2,500,000.00

2.00
3.00
2.25
5.00
1.00
1.00

Bh
Bh
M
Bh
Bh
bh

700,000
2,695,000
2,687,170.00
27,500.00
75,000.00
2,695,000.00

1,400,000.00
8,085,000.00
6,046,132.50
137,500.00
75,000.00
2,695,000.00

1.00 Unt
2.62 M
75.50 M'

5,000,000.00
1,323,080.00
246,215.00

5,000,000.00
3,463,161.90
18,589,232.50

18. Pekerjaan Sanitair


a Pas. Kloset jongkok
b Pas. Bak Mandi Fiber Glass
c Pas. Meja Beton Lapis Keramik
d Pas. Kran air
e Pas. Kran air washtafel
f Pas. Closed duduk

XI.

(Rp.)

46,855.00
46,855.00
54,395.00

PEKERJAAN PERLENGKAPAN LUAR


19. Pekerjaan Perlengkapan Luar
a Pas. Septictank Cap. 15 + Resapan
b Rabat Beton 1 : 3 : 5
c saluran keliling bangunan

SUB REKAPITULASI
I. PEKERJAAN PERMULAAN....
Rp.
II. PEKERJAAN PONDASI...Rp.
III. PEKERJAAN BETON / DINDING......Rp.
IV. PEKERJAAN KAP / ATAP.. Rp.
V. PEKERJAAN PLAFOND..Rp.
VI. PEKERJAAN PLESTERAN.Rp.
VII. PEKERJAAN LANTAIRp.
VIII. PEKERJAAN PINTU / JENDELA Rp.
IX. PEKERJAAN PENGECATAN
Rp.
X. PEKERJAAN PERLENGKAPAN DALAM. Rp.

XI. PEKERJAAN PERLENGKAPAN LUAR.Rp.


JUMLAH
Rp.

L TIPE 208/500

J U M LAH
(Rp.)

5,258,881.00
5,258,881.00

3,641,115.23

63,528,817.32
67,169,932.55

252,600,213.30

12,804,325.80

67,532,868.31
332,937,407.40

J U M LAH
(Rp.)

21,285,397.35

39,674,387.60

41,098,873.00
102,058,657.95

11,933,625.00

27,583,440.00
39,517,065.00

57,235,241.06
57,235,241.06

84,721,442.87
84,721,442.87

30,366,134.80

6,262,500.00
36,628,634.80

J U M LAH
(Rp.)

64,299,080.96
64,299,080.96

49,190,000.00

5,456,498.00

18,438,632.50
73,085,130.50

27,052,394.40
27,052,394.40

5,258,881.00
67,169,932.55
332,937,407.40
102,058,657.95
39,517,065.00
57,235,241.06
84,721,442.87
36,628,634.80
64,299,080.96
73,085,130.50

27,052,394.40
889,963,868.49

PEKERJAAN
RABAT BETON

SKETSA
RABAT BETON
Luas
tebal
Volume

RABAT BETON

SALURAN KELILING BANGUNAN

Saluran Keliling bangunan

Tp. CUCI
0.00
Km. TIDUR ANAK # 1
0.00
TERAS
BELAKANG
- 0.02
Rg. SHOLAT
+ 0.30

DAPUR
0.00

KM/WC
- 0.05
NAIK

TERAS
SAMPING
- 0.02

Rg. MAKAN
0.00

Rg. KELUARGA
0.00

GUDANG
0.00

GARASI
- 0.05

KM/WC
- 0.05

Km. TIDUR UTAMA


0.00

Rg. TAMU
+ 0.30

- 0.45

TERAS
DEPAN
+ 0.28

- 0.90

PERHITUNGAN

26 m2
0.1 m
2.6175 m3

VOLUME

75.5 m

40

25

43

V2

18

V1

70

15
50

15 V2
V1

50

63

V2

17

V1
70

20
15

V2

70

65

V1

DAFTAR HARGA SATUAN UPAH DAN BAHAN


:
:
:
:
:
:

PROGRAM
KEGIATAN
PAKET
PEKERJAAN
LOKASI
T.A

PENINGKATAN SARANA DAN PRASARANA APARATUR


PEMBANGUNAN GEDUNG LAINNYA
4 (EMPAT)
PERENCANAAN TEKNIS PEMBANGUNAN KANTOR CAMAT PANGKALAN KURAS
KECAMATAN PANGKALAN KURAS
2012

NO.

JENIS BAHAN

I
1
2
3
4
5

TENAGA KERJA
MANDOR
KEPALA TUKANG
TUKANG
PEKERJA
PENJAGA MALAM

II

BAHAN

BAHAN PASANGAN

1
2
3
4
5
5
6
7
8
9
10
11
12
6
7
8
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

SATUANHARGA SATUAN
KETERANGAN

HARI
HARI
HARI
HARI
HARI

PASIR URUG
PASIR PASANG
PASIR BETON / COR
TANAH URUG / TIMBUN
BATU PECAH
KERIKIL / KORAL BETON
SIRTU
SIRTU GALIAN/GRAVEL
AGGREGAT KASAR
AGGREGAT HALUS
FILER/ABU BATU
FINE/PASIR
BATU KALI UK. 5 x 10 CM
BATU BATA UK. (4 x 8 x 16) CM
BATU BATA RUMBAI/PRESS UK. 4 x 7 x
BATU BATA PRESS ( JUMBO ) UK. 5 x 1
PORTLAND CEMENT / SEMEN PADANG T
PORTLAND CEMENT WARNA
PAVING BLOK TEBAL 6 CM
CONEBLOK 10 x 10 x 20 CM
KANSTEEN CONEBLOK 30 x 60 CM
GRASS BLOK TEBAL 6 CM
BATU KERAWANG BETON
BATU KERAWANG TANAH LIAT
BATU SIKAT
BATU TEPLEK
BUIS BETON DIA.
20
CM
BUIS BETON DIA.
40
CM
BUIS BETON DIA.
60
CM
BUIS BETON DIA.
80
CM
BUIS BETON DIA.
100
CM

/
/
/
/
/

ORANG
Rp
ORANG
Rp
ORANG
Rp
ORANG
Rp
ORANG

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
KG.
M3.
M3.
BH.
BH.
BH.
KG.
KG.
BH.
BH.
BH.
BH.
BH.
BH.
M2.
M2.
BH.
BH.
BH.
BH.
BH.

85,000.00
80,000.00
75,000.00
70,000.00

Rp
59,920.00
Rp 149,800.00
Rp 181,900.00
Rp
51,360.00
Rp 247,170.00

Rp

353.00

Rp
Rp

1,220.00
3,210.00

22
23
24
25
26
27
28

29

B
1
2
3
4
5
2
6
7
7
8
8
9
10
8
9
10
9
10
11
10
11
12
13
12
13
12
13
14
13
14
14
15

TANAH HITAM
M3.
RUMPUT GAJAH
M2.
RUMPUT GAJAH MINI
M2.
ASPAL DRUM
KG.
ASPAL CURAH
KG.
BIAYA PERKERASAN ASPAL HOT MIX
M3.
BETON READY MIX : MUTU DENGAN MATERIAL KORAL
K 125
M3.
K 150
M3.
K 175
M3.
K 200
M3.
K 225
M3.
BETON READY MIX : MUTU DENGAN MATERIAL BATU PECAH
K 175
M3.
K 200
M3.
K 225
M3.
K 250
M3.
K 300
M3.

BAHAN KAYU
KAYU KELAS I
KAYU BALOK KELAS II
KAYU KASO 5/7
KAYU RENG 3/5
PAPAN 2/30
KAYU JATI
KAYU MERANTI / KAYU PAPAN KELAS II
KAYU LAMBERZIRING (JELUTUNG)
KAYU PIRI-PIRI BIASA
KAYU PIRI-PIRI BIASA PUC
PAPAN MERANTI
PAPAN MERANTI CAMPUR
TRIPLEKS
3 MM
TRIPLEKS
3.6 MM
TRIPLEKS
4 MM
TRIPLEKS
6 MM
TRIPLEKS
9 MM
TRIPLEKS
12 MM
KAYU CEROCOK / KAYU UBAR
KAYU DOLKEN
KAYU PERANCAH / BEKISTING DALAM
KAYU PROFIL
PAPAN LISPLANK UKIRAN ( LEBAH BERG
LISTPLANK ( GRC ) (2440x200x9) mm
SINGAP UKIR ( GRC )
SINGAP UKIR ( PAPAN )
GRC POLOS ( TANPA MOTIF )
SELEMBAYUNG UKIR ( GRC )
SELEMBAYUNG UKIR ( KAYU )
SELEMBAYUNG UKIR ( FIBERGLASS )
KAYU PAPAN PIRI-PIRI
KAYU BAKAR

BAHAN BESI / BAJA

1
2
2

BESI BETON BIASA


BESI BETON ULIR
KAWAT IKAT BETON (BANDRAT)

M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
LBR.
LBR.
LBR.
LBR.
LBR.
LBR.
BTG.
BTG.
M3.
M'
M'
M'
M2.
M2.
M'
BH.
BH.
BH.
LBR.
IKAT

KG.
KG.
KG.

Rp5,082,300.00
Rp3,852,000.00
Rp2,086,500.00
Rp2,086,500.00
Rp2,086,500.00
Rp3,852,000.00
Rp2,086,500.00
Rp3,852,000.00

Rp 128,400.00

Rp
10,112.00
Rp2,086,500.00

Rp
44,000.00
Rp 650,000.00

Rp 265,000.00

Rp

8,881.00

Rp

19,260.00

3
4
3
4
5
6
7
8
4
5
6
7
8
9
10
5
6

KUDA-KUDA + RANGKA ATAP BAJA RIN


METAL FURING C35
KAWAT HARMONIKA
KAWAT NYAMUK
TEMPAT MASAK ASPAL
KAWAT DURI
BESI PROFIL WF
VERTICAL BLIND
TERALI BESI PINTU / JENDELA
TERALI BESI PINTU / JENDELA ( BESI N
BESI PAGAR BRC
BESI PAGAR TERALI ( BESI BULAT )
BESI PAGAR TERALI ( BESI NAKO )
FOLDING GATE
RANGKA ALUMUNIUM
ALUMUNIUM PROFIL 4" YKK
SEALANT

BAHAN LANTAI

1
1
2
3
4
3
4
4
5
6
7
8
9
5
6
7
8
6
7
9
10
11
12
13
14
15
16
17
18
19
20
21

KERAMIK UK.
60x60 CM
KERAMIK UK.
40x40 CM
KERAMIK UK.
20x40 CM
KERAMIK UK.
33x33 CM
KERAMIK UK.
30x30 CM
KERAMIK UK.
25x25 CM
KERAMIK UK.
20x25 CM
KERAMIK UK.
25x40 CM
KERAMIK UK.
15x15 CM
KERAMIK UK.
10x10 CM
KERAMIK UK.
10x20 CM
PLIN KERAMIK
10X20 CM
PLIN KERAMIK
10X30 CM
PLIN KERAMIK
10X40 CM
PLIN KERAMIK
10X60 CM
PLIN KERAMIK TANGGA / SKEP FASING (
PLIN KERAMIK KM/WC/WBIS WARNA UK
BORDER KERAMIK 10X25 CM
STOP NOSSING
10X20 CM
BON-BON KERAMIK
GRANIT MOTIF KW 1
GRANIT UK.
80x80 CM
GRANIT UK.
60x60 CM
GRANIT UK.
40x40 CM
PORSELIN
MARMER
KARPET
PARQUET
BATU TEMPEL HITAM
BATU TEMPEL PALIMANAN
WALL COVER
VINIL

BAHAN ATAP

M2.
M'
M2.
M2.
BH.
M'
KG.
M2.
M2.
M2.
BH.
M'
M2.
M2.
M'
M'
TUBE

M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
M'
BH.
BH.
BH.
BH.
M2.
M2.
M2.
M2.
M2.
M2.
M2.

Rp 270,764.00
Rp
8,500.00

Rp
Rp

70,000.00
12,000.00

Rp
Rp

10,700.00
5,350.00

Rp

3,750.00

Rp

6,000.00

Rp

2,675.00

Rp
Rp

25,000.00
8,500.00

1
2
3
1
2
2
3
4
5
6
7
8
9
10
11

SENG GELOMBANG BJLS 20 K


LBR.
SENG GELOMBANG WARNA BJLS 20 K
LBR.
PERABUNG SENG PLAT BJLS 30 K
LBR.
ATAP GENTENG METAL 0,35 MM
M2.
ATAP ONDULIN BITUMEN
M2.
PERABUNG GENTENG METAL BULAT
LBR.
PERABUNG GENTENG METAL PERSEGI / LBR.
SENG PLAT BJLS 20 K
LBR.
SENG PLAT ALUMUNIUM
LBR.
PLASTIK GOT
M'
ASBES
LBR.
ALUMUNIUM FOIL
M2.
FORMIKA
M2.
ATAP GENTENG
Bh
NOK ATAP GENTENG
M'

Rp

31,565.00

Rp
Rp
Rp

26,750.00
26,750.00
59,920.00

BAHAN LANGIT - LANGIT DAN LAP. DINDING

1
2
1
2
2
3
3
3
4
5
5

PLYWOOD
3.6 MM
PLYWOOD
6 MM
PLYWOOD
9 MM
PLYWOOD JATI
4 MM
TEAKWOOD JATI
4 MM
GYPSUM BOARD
6 MM
GYPSUM BOARD
9 MM
LIST PROFIL KAYU
LIST PROFIL GYPSUM
PIRI-PIRI GRC BOARD T = 6 MM
METAL CLADING

G.

BAHAN PIPA

1
2
3
4
5
6
7
7
8
9
10
11
12
13
14
15
16

STOPKRAN DIA.
3/4 "
KRAN AIR DIA.
1/2 "
KRAN AIR DIA.
3/4 "
PIPA PVC
1/2 "
PIPA PVC
3/4 "
PIPA PVC
1"
PIPA PVC
2"
PIPA PVC
3"
PIPA PVC
4"
ELBOW PVC
4"
SOKET
4"
PIPA BESI (t=2.5mm)GIP 1 "
PIPA BESI (t=2.5mm)GIP 3/4 "
PIPA BESI (t=2.5mm)GIP 1/2 "
PIPA BESI (t=2.5mm) HITAM 2"
PIPA BESI (t=2.5mm) HITAM 3"
PIPA BESI (t=2.5mm) HITAM 4"

H.

BAHAN SANITAIR ( TOTO )

1
2
3
4
5
4
5

KLOSET JONGKOK
KLOSET DUDUK
FLOOR DRAIN
CLEAN OUT 0.2" (SARINGAN AIR KOTO
BAK FIBERGLASS 1 M3
WASTAFEL
BAK AIR KAMAR MANDI 220 ITR+C176

LBR.
LBR.
LBR.
LBR.
LBR.
LBR.
LBR.
M'
M'
M2.
M2.

Rp 128,400.00
Rp 142,300.00
Rp

58,850.00

Rp
Rp

24,717.00
24,000.00

BH.
BH.
BH.
M'
M'
M'
M'
M'
M'
BH.
BH.
M'
M'
M'
M'
M'
M'

Rp
Rp
Rp
Rp
Rp
Rp

27,500.00
54,602.00
54,602.00
17,120.00
20,330.00
22,113.00

Rp
Rp

57,245.00
76,326.67

BH.
BH.
BH.
BH.
BH.
BH.
BH.

Rp 192,600.00
Rp 749,000.00
Rp
9,095.00

Rp 376,640.00
Rp 176,550.00

6
7
8
9
10
11
6
7
8
9
10
11

I
1
2
3
4
2
3
4
5
6
8
6
7
11
8

J
1
2
3
2
3
4
5
6
7
8
9
10
11
12
13
9
10
11
12

TEMPAT SABUN
GANTUNGAN HANDUK
KACA KAMAR MANDI
MESIN POMPA AIR
URINOIR
BAK CUCI STAINLESS STEEL / KITCHEN
SEAL TAPE
BATHTUB KOMPLIT
TANKI AIR
0.50 M3
TANKI AIR
1.00 M3
KRAN AIR
STOP KRAN

BH.
BH.
BH.
UNIT
BH.
BH.
BH.
UNIT
BH.
BH.
BH.
BH.

Rp

5,000.00

KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
BH.
BH.
KG.
KG.
KG.
KG.

Rp

19,260.00

Rp
Rp
Rp
Rp
Rp

14,980.00
14,980.00
16,050.00
16,050.00
16,050.00

Rp

17,600.00

Rp

16,050.00

BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.

Rp 197,950.00

BAHAN PAKU
PAKU ATAP GENTENG METAL
PAKU KAYU
PAKU SENG
PAKU ASBES
PAKU SERI
PAKU 2" - 5"
PAKU 5 cm - 12 cm
PAKU 1 Cm - 2,5 Cm
PAKU SKRUP + BAUT + KARET DIA. 8"
ANGKER BESI
BESI STRIP 2"
PAKU GYPSUM
PAKU TRIPLEKS / TEAKWOOD
SKRUP FIXER

BAHAN PENGGANTUNG / KUNCI


KUNCI 2 SLAAG
KUNCI 1 SLAAG
KUNCI BIASA
GRENDEL PINTU
4"
GRENDEL PINTU
6"
ENGSEL PINTU
4"
ENGSEL JENDELA
3"
GRENDEL JENDELA
2"
HAK ANGIN JENDELA
HANDLE JENDELA
HANDLE PINTU
KUNCI GEMBOK
3"
KUNCI TANAM ANTIK
DOOR CLOSER
DOOR STOP
HINGES SETARA DEKSON
LOCK CASE
HANDLE PINTU FULL STAINLESS
HANDLE PINTU FULL ALLUMUNIUM

BAHAN KACA

1
2
3
4
3

KACA BENING
3 MM
M2.
KACA BENING
5 MM
M2.
KACA BENING
8 MM
M2.
ACRYLIC
6 MM
M2.
KACA NAKO ( RANGKA 9 DAUN + BESI UNIT

Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,000.00
18,000.00
7,500.00
16,050.00
5,350.00
6,420.00
5,350.00

Rp 750,000.00
Rp 423,720.00
Rp 280,000.00

Rp
96,600.00
Rp 154,560.00
Rp 231,840.00

4
5
6
7
8
9
10
11
5

J
1
2
3
4
3
3
4
5
4
5
6
7
8
9
10
10
11
12
12
13
14

KACA BURAM (DOP)


3 MM
KACA BURAM (DOP)
5 MM
KACA BLOK/GLASSBLOK
KACA PATRY TEBAL 8 MM BINGKAI TEMB
KACA PATRY TEBAL 16 MM BINGKAI TEM
KACA PATRY TEBAL 17 MM BINGKAI TEM
KACA GRAVIR
5 MM
KACA REBEN
5 MM
PROFIL KACA

M2.
M2.
BH.
M2.
M2.
M2.
M2.
M2.
M'

Rp

14,000.00

BAHAN LISTRIK
TITIK LAMPU (KABEL INSTALASI STAND
LAMPU PIJAR
20 WATT
LAMPU PIJAR
40 WATT
LAMPU NEON (JANTUNG)
35 WATT
LAMPU TL KOMPLIT
1X20 WATT TKI
LAMPU TL KOMPLIT
2X20 WATT TKO
LAMPU TL KOMPLIT
1X40 WATT TKI
LAMPU TL KOMPLIT
2X40 WATT TKO
STOP KONTAK BIASA
STOP KONTAK AC
PANEL BOX
SAKLAR TRIPLE
( STANDARD PLN)
SAKLAR GANDA ( STANDARD PLN)
SAKLAR TUNGGAL ( STANDARD PLN)
LAMPU PHILIPS XL SAVE ENERGY 25 W
LAMPU DOWN LIGHT KOMPLIT 20 WATT
LAMPU BARET KOMPLIT 20 WATT
LAMPU HIAS TANAM KOMPLIT
PANEL MCB KOMPLIT
( STANDA
EXHAUSST VAN BESAR
EXHAUSST VAN KECIL

BAHAN PINTU

1
2
3
4
5
6
1
2
3
4
5
5
2
3
6
7

PINTU PANIL TEMBUSU


PINTU PANIL MERANTI
PINTU TERALI BESI DIA. 12 MM
PINTU KACA 10 MM
PINTU TEAKWOOD
PINTU PLYWOOD
PINTU FIBER WARNA
PINTU PANIL KACA
PINTU ALUMUNIUM KACA ( SETARA YKK
PINTU FIBERGLASS MOTIF
PINTU BESI ROLLING DOOR
PINTU FRAMELESS KACA TEMPERED 1
PINTU ALLUMUNIUM KACA KOMPLIT
JENDELA ALLUMUNIUM KACA KOMPLIT
PINTU ALLUMUNIUM
JENDELA ALLUMUNIUM

BAHAN FINISHING

1
2
3
2

CAT MINYAK SETARA CATYLAC


KAPUR TEMBOK
CAT TEMBOK SETARA DANA BRITE
CAT TEMBOK SETARA CATYLAC

TTK.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
UNIT
UNIT

BH.
BH.
BH.
BH.
LBR.
LBR.
LBR.
LBR.
LBR.
LBR.
M2.
M'
Lbr
Lbr
M'
M'

KG.
KG.
KG.
KG.

Rp 179,760.00
Rp
14,606.00

Rp 231,655.00

Rp
16,853.00
Rp
22,000.00
Rp1,650,000.00
Rp
38,520.00
Rp
24,610.00
Rp
12,840.00
Rp
53,500.00
Rp 180,830.00
Rp

55,000.00

Rp 696,570.00

Rp1,699,000.00
Rp 745,000.00

Rp

69,550.00

Rp

28,890.00

3
4
5
6
6
7
8
8
9
10
9
10
10
11
11
12
13
12
13
13
14
15
16

CAT VERNISH
KG.
CAT KAYU DASAR / MENI
KG.
MINYAK CAT
LTR.
RESIDU
KG.
DEMPUL
KG.
PLAMIR
KG.
CAT ATAP SENG / GENTENG
KG.
KERTAS PASIR / AMPLAS
LBR.
PLITUR
LTR.
TEMPAT ADUKAN CAT
BH.
TEPUNG PENGISI NAT KERAMIK
KG.
TEPUNG PENGISI NAT GYPSUM / CORNI KG.
KUAS 3"
BH.
KUAS GULUNG / ROL
BH.
MINYAK BEKISTING
LTR.
SODA API
KG.
SABUN
BH.
LEM KAYU
KG.
LEM KAYU FOX
LTR.
BATACOTE
KG.
WALLPAPER
M2.
CAT IMPRA
KG.
CAT EXTERIOR ( WEATHER SHIELD)
KG.

O.

BAJA RINGAN

1
2
3
4
5
6

SUPERTRUSS C75. 100 INT


SUPERTRUSS C75. 75 INT
TOPSPAN 40,055 INT
WTEKS 12-14 x 20 HWFS CLASS II
CSP 10-16 x 16 HWFS CLASS II
SG 10 MULTIPLATE

KG.
KG.
KG.
PC.
PC.
PC.

Rp
Rp
Rp

27,500.00
16,050.00
5,350.00

Rp
Rp

18,000.00
16,030.00

Rp

2,500.00

Rp

3,210.00

Rp

15,000.00

Rp

7,490.00

Rp

2,140.00

Rp

7,500.00

PANGKALAN KURAS

Anda mungkin juga menyukai