No.
KEGIATAN
PEKERJAAN
ITEM PEKERJAAN
I. PEKERJAAN PERMULAAN.... Rp.
II. PEKERJAAN PONDASI... Rp.
III. PEKERJAAN BETON / DINDING......
Rp.
IV. PEKERJAAN KAP / ATAP.. Rp.
V. PEKERJAAN PLAFOND
Rp.
VI. PEKERJAAN PLESTERAN Rp.
VII. PEKERJAAN LANTAI Rp.
VIII. PEKERJAAN PINTU / JENDELA
Rp.
IX. PEKERJAAN PENGECATAN Rp.
X. PEKERJAAN PERLENGKAPAN DALAM Rp.
XI. PEKERJAAN PERLENGKAPAN LUAR Rp.
JUMLAH
Rp.
PPN (10%)
Rp.
TOTAL JUMLAH + PPN
Rp.
TOTAL ANGGARAN
Rp.
Terbilang:
Tujuh ratus empat puluh sembilan juta enam puluh ribu rupiah.
BIAYA
BOBOT (%)
5,258,881.00
0.59
67,169,932.55
7.55
332,937,407.40
37.41
102,058,657.95
11.47
39,517,065.00
4.44
57,235,241.06
6.43
84,721,442.87
9.52
36,628,634.80
4.12
64,299,080.96
7.22
73,085,130.50
8.21
27,052,394.40
3.04
889,963,868.49
88,996,386.85
978,960,255.34
749,060,000.00
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
NO
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
BAHAN
II. BAHAN-BAHAN.
Kerikil cor
Pasir cor
Pasir pasang
Pasir urug
Tanah urug
Batu bata
Kayu Klas I
Kayu Klas II
Kayu Kelas III
Semen Tipe I
Semen Putih
Keramik uk. 20x20 cm
Keramik 25x25 cm
Keramik uk. 60x60 cm
Bon bon Keramik
Genteng Metal
Perabung Genteng Metal
Kunci Tanam UNION 2 x slagh
Kunci bulat
Engsel Nylon Pintu
Engsel Nylon Jendela
Grendel Pintu
Grendel Jendela
Hak Angin Jendela
Tangan-tangan Jendela
Kaca bening tebal 5 mm
Kaca RayBen tebal 5 mm
Besi Beton 12
Besi Beton 8
Kawat beton
Gypsum 6mm
Paku Atap
Paku kayu
Paku Triplek
Cat Minyak setara Platon
BAHAN
Cat Tembok (cat air)
Cat Dasar
Menie Kayu / Besi
Thinner
Plamur tembok
Dempul jadi
Politur
Residu
Amplas kayu
Pipa Air PVC 1/2"
Pipa PVC 3/4"
Pipa PVC 1"
Pipa PVC 2"
Pipa PVC 3"
Pipa PVC 4"
SATUAN
HARGA STN
( Rp )
M
M
M
M
M
Buah
M
M
M
Zak
Kg
M
M
M
M'
Lbr
Lbr
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
M
M
Kg
Kg
Kg
M2
Kg
Kg
Kg
Kg
SATUAN
300,000
220,000
155,000
130,000
85,000
500
6,500,000
3,500,000
2,100,000
90,000
5,000
98,000
55,000
250,000
15,000
55,000
26,750
110,000
75,000
55,000
40,000
25,000
20,000
25,000
30,250
100,000
150,000
21,000
17,000
20,000
95,000
30,000
23,000
19,000
75,000
HARGA STN
( Rp )
65,000
25,000
25,000
27,600
5,000
26,000
45,000
17,000
5,000
5,000
6,450
25,000
35,000
57,000
76,000
Kg
Kg
Lt
Lt
Kg
Kg
Ltr
Kg
Lbr
m
m
m
m
m
m
KETERANGAN
KETERANGAN
NO
U RAIAN
H. SATUAN
1 Pembersihan Lapangan / 10 m2.
0.750 Pekerja
Rp.
75,000.00 Rp.
0.025 Mandor
Rp.
85,000.00 Rp.
Rp.
Untuk 1 m2 = 1/10 x
Dibulatkan
2 Pasangan Bouwplank / 10 m'
0.800 Tukang Kayu
Rp.
70,000.00 Rp.
0.280 Pekerja
Rp.
75,000.00 Rp.
0.090 M3 Papan Kls III
Rp. 2,100,000.00
13.500 M' Tiang Pancang
Rp.
6,000.00
0.100 Kg Paku kayu
Rp.
23,000.00
Rp.
Untuk 1 m' = 1/10 x
Dibulatkan
3
75,000.00 Rp.
Rp.
UPAH
BAHAN
56,250.00
2,125.00
58,375.00
56,000.00
21,000.00
Rp.
Rp.
Rp
77,000.00 Rp
189,000.00
81,000.00
2,300.00
272,300.00
56,250.00
56,250.00
Dibulatkan
4 Pemasangan cerocok dia 15 - 200 cm / titik
0.003 Pekerja
Rp.
75,000.00
0.02 Tukang
Rp.
70,000.00
0.01 Mandor
Rp.
85,000.00
2.2 M' Kayu cerocok
Rp.
7,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
225.00
1,400.00
850.00
75,000.00 Rp.
70,000.00 Rp.
90,000.00
220,000.00
300,000.00
Rp.
450,000.00
35,000.00
Rp.
2,475.00 Rp.
15,400.00
15,400.00
Rp.
Rp.
Rp.
485,000.00 Rp.
427,680.00
125,400.00
285,000.00
838,080.00
92,000.00
315,000.00
Dibulatkan
6
407,000.00
4.500
4.500
110.000
2.000
Tukang besi
Pekerja
Kg Besi Beton
Kg Kawat Beton
Rp.
Rp.
Rp.
Rp.
70,000.00 Rp.
75,000.00 Rp.
21,000.00
20,000.00
Rp.
315,000.00
337,500.00
Rp.
Rp.
652,500.00 Rp.
2,310,000.00
40,000.00
2,350,000.00
Rp.
Rp.
Rp.
250,000.00
228,240.00
62,930.00
105,000.00
337,500.00
442,500.00 Rp.
541,170.00
Rp.
Rp.
Rp.
250,000.00
370,800.00
51,615.00
140,000.00
450,000.00
590,000.00 Rp
672,415.00
Dibulatkan
1,323,080.00
657,000.00
3,002,500.00
Dibulatkan
11 Beton Struktur K. 225- 1:1,5:2,5 - Anal G.41.A/m3
6.000 Pekerja
Rp.
75,000.00
0.300 Mandor
Rp.
85,000.00
1.000 Tukang Batu
Rp.
70,000.00
0.100 Kep tkg Batu
Rp.
80,000.00
7.260 Zak semen
Rp.
90,000.00
0.570 M3 Pasir Cor
Rp.
220,000.00
0.900 M3 kerikil
Rp.
300,000.00
1.400 Cetakan Beton F.8
Rp.
657,000.00
1.500 Rangka Besi Anal.12
Rp. 3,002,500.00
Rp.
Rp.
Rp.
Rp.
Rp.
Dibulatkan
12 Upah Plesteran tebal 15 mm- Anal. G.47/m2
450,000.00
25,500.00
70,000.00
8,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
553,500.00 Rp.
653,400.000
125,400.000
270,000.000
919,800.000
4,503,750.000
6,472,350.000
0.400 Pekerja
0.200 Tukang Batu
Rp.
Rp.
75,000.00 Rp.
70,000.00 Rp.
Rp.
30,000.00
14,000.00
44,000.00
Dibulatkan
13 Plesteran tebal 15 mm 1:2 - Anal. G.50.K/m2
0.230 Zak Semen
Rp.
90,000.00
0.013 M3 Pasir Pasang
Rp.
155,000.00
Upah Anal G.47
Rp.
44,000.00 Rp.
Rp.
Dibulatkan
Rp.
Rp.
20,700.00
2,015.00
44,000.00
44,000.00 Rp.
22,715.00
Rp.
Rp.
14,310.00
3,255.00
44,000.00
44,000.00 Rp.
17,565.00
90,000.00
155,000.00
Rp.
Rp.
Rp.
1,123,920.00
147,250.00
1,271,170.00
90,000.00
155,000.00
Rp.
Rp.
Rp.
693,360.00
179,800.00
873,160.00
7,000.00
15,000.00
12,711.70 Rp.
Rp.
Rp.
34,711.70 Rp.
12,711.70
55,000.00
400.00
55,400.00
22,500.00
Rp.
22,500.00 Rp.
102,000.00
102,000.00
0.300 Pekerja
1.200 M3 Pasir Urug
Rp.
Rp.
75,000.00 Rp.
130,000.00
Rp.
22,500.00
Rp.
22,500.00 Rp.
156,000.00
156,000.00
Dibulatkan
20 Pas. Lantai Keramik uk. 25 x 25 cm - Supl.III. b/m2
0.100 Tukang batu
Rp.
70,000.00 Rp.
0.200 Pekerja
Rp.
75,000.00 Rp.
0.010 M3 Spesi 1:4/G.19
Rp.
873,160.00
1.000 M2 Keramik uk.25x25 Rp.
55,000.00
0.016 Zak Semen
Rp.
90,000.00
Rp.
Upah Pelaksanaan 80%
Rp.
Dibulatkan
21 Pas. Lantai Keramik uk. 60 x 60 cm - Supl.III. c/m2
0.100 Tukang batu
Rp.
70,000.00 Rp.
0.200 Pekerja
Rp.
75,000.00 Rp.
0.010 M3 Spesi 1:4/G.19
Rp.
873,160.00
1.000 M2 Keramik uk.30x30 Rp.
250,000.00
0.016 Zak Semen
Rp.
90,000.00
Rp.
Upah Pelaksanaan 60%
Rp.
Dibulatkan
22 Pas. Meja Beton Lapis Keramik 20 x 20
0.100 Tukang Batu
Rp.
70,000.00 Rp.
0.200 Pekerja
Rp.
75,000.00 Rp.
1.000 M2 Keramik 20X20
Rp.
55,000.00
0.016 Zak Semen
Rp.
90,000.00
110.000 Kg Besi Beton
Rp.
21,000.00
2.000 Kg Kawat Beton
Rp.
20,000.00
500.000 Bh Batu Bata
Rp.
500.00
0.010 M3 Spesi 1:4/G.19
Rp.
873,160.00
Rp.
Dibulatkan
Rp.
6,500,000.00
7,000.00
15,000.00
Rp.
Rp.
Rp.
8,731.60
55,000.00
1,440.00
22,000.00
17,600.00 Rp.
65,171.60
7,000.00
15,000.00
Rp.
Rp.
Rp.
8,731.60
250,000.00
1,440.00
22,000.00
13,200.00 Rp
260,171.60
7,000.00
15,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,000.00 Rp.
55,000.00
1,440.00
2,310,000.00
40,000.00
250,000.00
8,731.60
2,665,171.60
2,520,000.00
900,000.00
Rp.
7,150,000.00
Rp. 3,420,000.00
Upah Pelaksanaan 50 %
Rp. 1,710,000.00
Dibulatkan
24 Pas. Pintu Panil Papan - Anal. F.33 /m2
7.500 Tukang Kayu
Rp.
70,000.00 Rp.
525,000.00
2.500 Pekerja
Rp.
75,000.00 Rp.
187,500.00
0.035 M3 Kayu Klas II
Rp. 3,500,000.00
0.200 Kg Paku Kayu
Rp.
23,000.00
Rp.
712,500.00
Upah Pelaksanaan 50 %
Rp.
356,250.00
Dibulatkan
25 Pas. Pintu Rangka Kaca/ Jendela Rangka Kaca 5 mm-Anal.F.36 /m2
6.000 Tukang Kayu
Rp.
70,000.00 Rp.
420,000.00
2.000 Pekerja
Rp.
75,000.00 Rp.
150,000.00
0.035 M3 Kayu Klas II
Rp. 3,500,000.00
0.900 M2 Kaca Tebal 5 mm Rp.
150,000.00
Rp.
570,000.00
Upah Pelaksanaan 20 %
Rp.
114,000.00
Dibulatkan
26 Mengerjakan Kuda Kuda Kayu-Anal. F22 /m3
24.000 Tukang Kayu
Rp.
70,000.00
2.400 Kep tukang kayu
Rp.
75,000.00
8.000 Pekerja
Rp.
75,000.00
0.400 Mandor
Rp.
85,000.00
1.100 M3 Kayu kelas II
Rp. 3,500,000.00
9.000 Kg. Paku Kayu
Rp.
23,000.00
Upah Pelaksanaan 50 %
Dibulatkan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,150,000.00
Rp.
Rp.
122,500.00
4,600.00
Rp.
127,100.00
Rp.
Rp.
122,500.00
135,000.00
Rp.
257,500.00
Rp.
Rp.
3,850,000.00
207,000.00
2,494,000.00
1,247,000.00 Rp.
4,057,000.00
1,680,000.00
180,000.00
600,000.00
34,000.00
7,000.00
800.00
7,500.00
4,250.00
Rp.
Rp.
59,500.00
5,750.00
19,550.00
24,437.50 Rp.
65,250.00
Rp.
Rp.
Rp.
Rp.
7,000.00
800.00
15,000.00
850.00
Rp.
Rp.
Rp.
23,650.00 Rp.
Dibulatkan
29 Memasang Perabung Atap Genteng Metal Anal-H,10 /10m'
0.250 Tukang Kayu
Rp.
70,000.00 Rp.
0.025 Kep tukang kayu
Rp.
80,000.00 Rp.
17,500.00
2,000.00
110,000.00
600.00
110,600.00
0.250
0.025
1.000
0.040
Pekerja
Mandor
M' Perabung gtg Metal
Kg. Paku Genteng
Rp.
Rp.
Rp.
Rp.
75,000.00 Rp.
85,000.00 Rp.
75,000.00
30,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
95,000
19,000.00
75,000.00
85,000.00
70,000.00
80,000.00
18,750.00
2,125.00
Rp.
Rp.
40,375.00 Rp.
75,000.00
1,200.00
76,200.00
Rp.
Rp.
104,500.00
380.00
70,000.00
80,000.00
75,000.00
85,000.00
2,100,000.00
23,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Upah Pelaksanaan 50 %
Rp.
Dibulatkan
32 Mencat Tembok 1x Plamur + 2x cat Warna-Anal.K.3+K.26/m2
0.160 Kg Plamur
Rp.
5,000.00
0.313 Kg Cat Tembok
Rp.
65,000.00
0.200 Hl Amplas
Rp.
5,000
0.300 Tukang Cat
Rp.
70,000.00 Rp.
0.150 Pekerja
Rp.
75,000.00 Rp.
Rp.
Dibulatkan
33 Mencat Tembok 2x cat Warna-Anal.K.26/m2
0.313 Kg Cat Tembok
Rp.
65,000.00
0.200 Tukang Cat
Rp.
70,000.00 Rp.
0.100 Pekerja
Rp.
75,000.00 Rp.
Rp.
Dibulatkan
30,000.00
85.00
35,000.00
80.00
65,165.00
104,880.00
7,000.00
4,000.00
7,500.00
4,250.00
Rp.
Rp.
29,400.00
4,600.00
22,750.00
11,375.00 Rp.
34,000.00
Rp.
Rp.
Rp.
800.00
20,345.00
1,000.00
21,000.00
11,250.00
32,250.00 Rp.
22,145.00
Rp.
14,000.00
7,500.00
21,500.00 Rp.
20,345.00
20,345.00
20,800.00
21,252.00
10,000.00
35,500.00
213,000.00
300,552.00
70,000.00 Rp.
Rp.
28,000.00
168,000.00 Rp.
300,552.00
3,500,000.00
23,000.00
70,000.00
80,000.00
75,000.00
85,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
20,800.00
10,000.00
159,750.00
Rp.
190,550.00
Rp.
190,550.00
Rp.
Rp.
10,500.00
230.00
14,000.00
1,600.00
5,250.00
255.00
21,105.00 Rp.
10,730.00
Dibulatkan
37 Saluran Keliling Bangunan - Anal. Supl. V/m'
0.120 Galian Tanah A.1
Rp.
56,250.00 Rp.
0.020 Timbunan Pasir
Rp.
178,500.00 Rp.
0.100 Beton Anal G.43.B
Rp. 1,323,080.00
0.050 Pas. Batu Bata 1 : 2
Rp. 1,271,170.00
0.600 Plesteran Spesi 1 :2
Rp.
66,715.00
Rp.
38
Rp.
Rp.
Rp.
Rp.
Rp.
75,000.00 Rp.
70,000.00 Rp.
90,000.00
220,000.00
300,000.00
Rp.
6,750.00
3,570.00
Rp.
Rp.
Rp.
10,320.00 Rp
132,308.00
63,558.50
40,029.00
235,895.50
450,000.00
70,000.00
Rp.
Rp.
Rp.
520,000.00 Rp.
612,000.00
118,800.00
249,000.00
979,800.00
JUMLAH
Rp.
Rp.
Rp.
58,375.00
5,837.50
5,835.00
Rp.
Rp.
Rp.
349,300.00
34,930.00
34,930.00
Rp.
Rp.
56,250.00
56,250.00
Rp.
Rp.
20,350.00
20,350.00
Rp.
Rp.
1,323,080.00
1,323,080.00
Rp.
Rp.
657,000.00
657,000.00
Rp.
Rp.
3,002,500.00
3,002,500.00
Rp.
Rp.
983,670.00
983,670.00
Rp.
Rp.
1,262,415.00
1,262,415.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,323,080.00
919,800.00
4,503,750.00
6,746,630.00
6,746,630.00
Rp.
Rp.
7,025,850.00
7,025,850.00
Rp.
Rp.
44,000.00
44,000.00
Rp.
Rp.
66,715.00
66,715.00
Rp.
Rp.
61,565.00
61,565.00
Rp.
Rp.
1,271,170.00
1,271,170.00
Rp.
Rp.
873,160.00
873,160.00
Rp.
Rp.
90,111.70
90,110.00
Rp.
Rp.
124,500.00
124,500.00
Rp.
Rp.
178,500.00
178,500.00
Rp.
Rp.
82,771.60
82,770.00
Rp.
Rp.
273,371.60
273,370.00
Rp.
Rp.
2,687,171.60
2,687,170.00
Rp.
Rp.
8,860,000.00
8,860,000.00
Rp.
Rp.
483,350.00
483,350.00
Rp.
Rp.
371,500.00
371,500.00
Rp.
Rp.
5,304,000.00
5,304,000.00
Rp.
Rp.
89,687.50
89,685.00
Rp.
Rp.
134,250.00
134,250.00
Rp.
Rp.
Rp.
116,575.00
11,657.50
11,657.00
Rp.
170,045.00
Rp.
Rp.
45,375.00
45,375.00
Rp.
Rp.
54,395.00
54,395.00
Rp.
Rp.
41,845.00
41,845.00
Rp.
Rp.
Rp.
468,552.00
46,855.20
46,855.00
Rp.
Rp.
Rp.
358,550.00
35,855.00
35,855.00
Rp.
Rp.
31,835.00
31,835.00
Rp.
Rp
246,215.50
246,215.00
Rp.
Rp.
1,499,800.00
1,499,800.00
NO
I.
KEGIATAN
PEKERJAAN
URAIAN PEKERJAAN
PEKERJAAN PERMULAAN
1. Pembersihan Lapangan
a Pembersihan Lokasi
b Pas. Bowplank
VOLUME
HARGA STN
JUMLAH STN
(Rp.)
(Rp.)
493.00 M
68.20 M'
5,835.00
34,930.00
2,876,655.00
2,382,226.00
51.78 M
12.95 M
56,250.00
56,250.00
2,912,892.19
728,223.05
2.62
2.62
12.84
4.23
102.72
333.80
M
M
M
M
M
btg
178,500.00
1,323,080.00
1,262,415.00
7,025,850.00
66,715.00
20,350.00
466,889.06
3,460,681.13
16,209,408.60
29,746,043.73
6,852,964.80
6,792,830.00
0.32
2.07
0.08
1.38
1.89
1.54
3.62
2.13
2.03
2.05
1.83
0.36
1.20
4.55
0.49
3.03
1.00
6.25
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Ls
M
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
6,746,630.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
7,025,850.00
6,746,630.00
6,746,630.00
10,000,000.00
7,025,850.00
2,239,489.69
14,509,785.42
533,964.60
9,687,241.98
13,272,533.24
10,835,968.46
24,445,739.14
14,943,982.95
14,280,040.13
14,395,966.65
12,852,036.11
2,529,306.00
8,431,020.00
31,944,065.09
3,305,848.70
20,456,018.29
10,000,000.00
43,937,206.85
1.34 M
68.02 kg
8,860,000.00
8,500.00
11,890,164.30
578,161.50
c Neut
6. Pekerjaan Dinding
a Pas. Dinding Bata 1 : 2
b Pas. Dinding Bata 1 : 4
28.00 Bh
12,000.00
336,000.00
8.69 M
57.50 M
1,262,415.00
983,670.00
10,973,589.73
56,559,278.58
NO
IV.
URAIAN PEKERJAAN
PEKERJAAN KAP/ATAP
7. Pekerjaan Kuda - Kuda/ Kap
a Pas. Kuda kuda , Gording , Kasau
b Angkur Kuda-kuda
JUMLAH STN
(Rp.)
(Rp.)
5,304,000.00
8,000.00
21,055,349.35
230,048.00
275.00 M
86.56 M'
134,250.00
31,835.00
36,918,750.00
2,755,637.60
24.51 M'
81.56 M'
16.13 M'
11,657.00
11,657.00
11,657.00
285,713.07
950,744.92
188,027.41
PEKERJAAN PLAFOND
9. Pekerjaan Rangka Plafond
a Pas. Rangka Plafond
263.00 M
45,375.00
11,933,625.00
263.00 M
104,880.00
27,583,440.00
PEKERJAAN PLESTERAN
11. Pekerjaan Plesteran
a Pek. Plesteran Dinding 1:2
b Pek. Plesteran Dinding 1:4
c Pas. Dinding keramik uk. 25x25 cm
115.90 M
766.64 M
25.58 M
66,715.00
61,565.00
90,110.00
7,732,301.86
47,198,375.96
2,304,563.25
M
M
M
M
M
1,323,080.00
273,370.00
82,770.00
124,500.00
178,500.00
16,645,468.37
52,477,813.76
1,298,454.38
12,334,735.16
1,964,971.20
34.93 M
9.19 M
18.31 M
483,350.00
371,500.00
550,000.00
16,885,230.00
3,413,044.80
10,067,860.00
9.00
54.00
20.00
20.00
10.00
20.00
4.00
110,000.00
55,000.00
40,000.00
20,000.00
30,250.00
25,000.00
75,000.00
990,000.00
2,970,000.00
800,000.00
400,000.00
302,500.00
500,000.00
300,000.00
c Pas.Jurai Dalam
d Pas.Jurai Luar
e Pas.Perabung
VI.
HARGA STN
3.97 M
28.76 kg
8. Pekerjaan Atap
a Pas. Atap Genteng Metal
b Pas. Lisplank Papan
V.
VOLUME
12.58
191.97
15.69
99.07
11.01
Bh
Bh
Bh
Bh
Bh
Bh
Bh
IX.
PEKERJAAN PENGECATAN
15. Pekerjaan Pengecatan
a Mencat kayu kozen dan jendela
b Mencat plafond Gypsum
28.16 M
263.00 M
46,855.00
46,855.00
1,319,499.33
12,322,865.00
NO
URAIAN PEKERJAAN
VOLUME
21.64 M
34.93 M
882.54 M
HARGA STN
JUMLAH STN
(Rp.)
X.
1,013,942.20
1,636,821.04
48,005,953.38
85.00
3.00
7.00
33.00
18.00
27.00
6.00
8.00
5.00
6.00
Ttk
Bh
Bh
Bh
Bh
Ttk
bh
bh
bh
bh
220,000
1,000,000
35,000
180,000
60,000
170,000
2,500,000
25,000
33,000
45,000
18,700,000.00
3,000,000.00
245,000.00
5,940,000.00
1,080,000.00
4,590,000.00
15,000,000.00
200,000.00
165,000.00
270,000.00
22.57
29.64
3.00
1.00
M'
M'
Bh
Bh
76,000
6,450
350,000
2,500,000
1,715,320.00
191,178.00
1,050,000.00
2,500,000.00
2.00
3.00
2.25
5.00
1.00
1.00
Bh
Bh
M
Bh
Bh
bh
700,000
2,695,000
2,687,170.00
27,500.00
75,000.00
2,695,000.00
1,400,000.00
8,085,000.00
6,046,132.50
137,500.00
75,000.00
2,695,000.00
1.00 Unt
2.62 M
75.50 M'
5,000,000.00
1,323,080.00
246,215.00
5,000,000.00
3,463,161.90
18,589,232.50
XI.
(Rp.)
46,855.00
46,855.00
54,395.00
SUB REKAPITULASI
I. PEKERJAAN PERMULAAN....
Rp.
II. PEKERJAAN PONDASI...Rp.
III. PEKERJAAN BETON / DINDING......Rp.
IV. PEKERJAAN KAP / ATAP.. Rp.
V. PEKERJAAN PLAFOND..Rp.
VI. PEKERJAAN PLESTERAN.Rp.
VII. PEKERJAAN LANTAIRp.
VIII. PEKERJAAN PINTU / JENDELA Rp.
IX. PEKERJAAN PENGECATAN
Rp.
X. PEKERJAAN PERLENGKAPAN DALAM. Rp.
L TIPE 208/500
J U M LAH
(Rp.)
5,258,881.00
5,258,881.00
3,641,115.23
63,528,817.32
67,169,932.55
252,600,213.30
12,804,325.80
67,532,868.31
332,937,407.40
J U M LAH
(Rp.)
21,285,397.35
39,674,387.60
41,098,873.00
102,058,657.95
11,933,625.00
27,583,440.00
39,517,065.00
57,235,241.06
57,235,241.06
84,721,442.87
84,721,442.87
30,366,134.80
6,262,500.00
36,628,634.80
J U M LAH
(Rp.)
64,299,080.96
64,299,080.96
49,190,000.00
5,456,498.00
18,438,632.50
73,085,130.50
27,052,394.40
27,052,394.40
5,258,881.00
67,169,932.55
332,937,407.40
102,058,657.95
39,517,065.00
57,235,241.06
84,721,442.87
36,628,634.80
64,299,080.96
73,085,130.50
27,052,394.40
889,963,868.49
PEKERJAAN
RABAT BETON
SKETSA
RABAT BETON
Luas
tebal
Volume
RABAT BETON
Tp. CUCI
0.00
Km. TIDUR ANAK # 1
0.00
TERAS
BELAKANG
- 0.02
Rg. SHOLAT
+ 0.30
DAPUR
0.00
KM/WC
- 0.05
NAIK
TERAS
SAMPING
- 0.02
Rg. MAKAN
0.00
Rg. KELUARGA
0.00
GUDANG
0.00
GARASI
- 0.05
KM/WC
- 0.05
Rg. TAMU
+ 0.30
- 0.45
TERAS
DEPAN
+ 0.28
- 0.90
PERHITUNGAN
26 m2
0.1 m
2.6175 m3
VOLUME
75.5 m
40
25
43
V2
18
V1
70
15
50
15 V2
V1
50
63
V2
17
V1
70
20
15
V2
70
65
V1
PROGRAM
KEGIATAN
PAKET
PEKERJAAN
LOKASI
T.A
NO.
JENIS BAHAN
I
1
2
3
4
5
TENAGA KERJA
MANDOR
KEPALA TUKANG
TUKANG
PEKERJA
PENJAGA MALAM
II
BAHAN
BAHAN PASANGAN
1
2
3
4
5
5
6
7
8
9
10
11
12
6
7
8
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
SATUANHARGA SATUAN
KETERANGAN
HARI
HARI
HARI
HARI
HARI
PASIR URUG
PASIR PASANG
PASIR BETON / COR
TANAH URUG / TIMBUN
BATU PECAH
KERIKIL / KORAL BETON
SIRTU
SIRTU GALIAN/GRAVEL
AGGREGAT KASAR
AGGREGAT HALUS
FILER/ABU BATU
FINE/PASIR
BATU KALI UK. 5 x 10 CM
BATU BATA UK. (4 x 8 x 16) CM
BATU BATA RUMBAI/PRESS UK. 4 x 7 x
BATU BATA PRESS ( JUMBO ) UK. 5 x 1
PORTLAND CEMENT / SEMEN PADANG T
PORTLAND CEMENT WARNA
PAVING BLOK TEBAL 6 CM
CONEBLOK 10 x 10 x 20 CM
KANSTEEN CONEBLOK 30 x 60 CM
GRASS BLOK TEBAL 6 CM
BATU KERAWANG BETON
BATU KERAWANG TANAH LIAT
BATU SIKAT
BATU TEPLEK
BUIS BETON DIA.
20
CM
BUIS BETON DIA.
40
CM
BUIS BETON DIA.
60
CM
BUIS BETON DIA.
80
CM
BUIS BETON DIA.
100
CM
/
/
/
/
/
ORANG
Rp
ORANG
Rp
ORANG
Rp
ORANG
Rp
ORANG
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
KG.
M3.
M3.
BH.
BH.
BH.
KG.
KG.
BH.
BH.
BH.
BH.
BH.
BH.
M2.
M2.
BH.
BH.
BH.
BH.
BH.
85,000.00
80,000.00
75,000.00
70,000.00
Rp
59,920.00
Rp 149,800.00
Rp 181,900.00
Rp
51,360.00
Rp 247,170.00
Rp
353.00
Rp
Rp
1,220.00
3,210.00
22
23
24
25
26
27
28
29
B
1
2
3
4
5
2
6
7
7
8
8
9
10
8
9
10
9
10
11
10
11
12
13
12
13
12
13
14
13
14
14
15
TANAH HITAM
M3.
RUMPUT GAJAH
M2.
RUMPUT GAJAH MINI
M2.
ASPAL DRUM
KG.
ASPAL CURAH
KG.
BIAYA PERKERASAN ASPAL HOT MIX
M3.
BETON READY MIX : MUTU DENGAN MATERIAL KORAL
K 125
M3.
K 150
M3.
K 175
M3.
K 200
M3.
K 225
M3.
BETON READY MIX : MUTU DENGAN MATERIAL BATU PECAH
K 175
M3.
K 200
M3.
K 225
M3.
K 250
M3.
K 300
M3.
BAHAN KAYU
KAYU KELAS I
KAYU BALOK KELAS II
KAYU KASO 5/7
KAYU RENG 3/5
PAPAN 2/30
KAYU JATI
KAYU MERANTI / KAYU PAPAN KELAS II
KAYU LAMBERZIRING (JELUTUNG)
KAYU PIRI-PIRI BIASA
KAYU PIRI-PIRI BIASA PUC
PAPAN MERANTI
PAPAN MERANTI CAMPUR
TRIPLEKS
3 MM
TRIPLEKS
3.6 MM
TRIPLEKS
4 MM
TRIPLEKS
6 MM
TRIPLEKS
9 MM
TRIPLEKS
12 MM
KAYU CEROCOK / KAYU UBAR
KAYU DOLKEN
KAYU PERANCAH / BEKISTING DALAM
KAYU PROFIL
PAPAN LISPLANK UKIRAN ( LEBAH BERG
LISTPLANK ( GRC ) (2440x200x9) mm
SINGAP UKIR ( GRC )
SINGAP UKIR ( PAPAN )
GRC POLOS ( TANPA MOTIF )
SELEMBAYUNG UKIR ( GRC )
SELEMBAYUNG UKIR ( KAYU )
SELEMBAYUNG UKIR ( FIBERGLASS )
KAYU PAPAN PIRI-PIRI
KAYU BAKAR
1
2
2
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
M3.
LBR.
LBR.
LBR.
LBR.
LBR.
LBR.
BTG.
BTG.
M3.
M'
M'
M'
M2.
M2.
M'
BH.
BH.
BH.
LBR.
IKAT
KG.
KG.
KG.
Rp5,082,300.00
Rp3,852,000.00
Rp2,086,500.00
Rp2,086,500.00
Rp2,086,500.00
Rp3,852,000.00
Rp2,086,500.00
Rp3,852,000.00
Rp 128,400.00
Rp
10,112.00
Rp2,086,500.00
Rp
44,000.00
Rp 650,000.00
Rp 265,000.00
Rp
8,881.00
Rp
19,260.00
3
4
3
4
5
6
7
8
4
5
6
7
8
9
10
5
6
BAHAN LANTAI
1
1
2
3
4
3
4
4
5
6
7
8
9
5
6
7
8
6
7
9
10
11
12
13
14
15
16
17
18
19
20
21
KERAMIK UK.
60x60 CM
KERAMIK UK.
40x40 CM
KERAMIK UK.
20x40 CM
KERAMIK UK.
33x33 CM
KERAMIK UK.
30x30 CM
KERAMIK UK.
25x25 CM
KERAMIK UK.
20x25 CM
KERAMIK UK.
25x40 CM
KERAMIK UK.
15x15 CM
KERAMIK UK.
10x10 CM
KERAMIK UK.
10x20 CM
PLIN KERAMIK
10X20 CM
PLIN KERAMIK
10X30 CM
PLIN KERAMIK
10X40 CM
PLIN KERAMIK
10X60 CM
PLIN KERAMIK TANGGA / SKEP FASING (
PLIN KERAMIK KM/WC/WBIS WARNA UK
BORDER KERAMIK 10X25 CM
STOP NOSSING
10X20 CM
BON-BON KERAMIK
GRANIT MOTIF KW 1
GRANIT UK.
80x80 CM
GRANIT UK.
60x60 CM
GRANIT UK.
40x40 CM
PORSELIN
MARMER
KARPET
PARQUET
BATU TEMPEL HITAM
BATU TEMPEL PALIMANAN
WALL COVER
VINIL
BAHAN ATAP
M2.
M'
M2.
M2.
BH.
M'
KG.
M2.
M2.
M2.
BH.
M'
M2.
M2.
M'
M'
TUBE
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
M'
BH.
BH.
BH.
BH.
M2.
M2.
M2.
M2.
M2.
M2.
M2.
Rp 270,764.00
Rp
8,500.00
Rp
Rp
70,000.00
12,000.00
Rp
Rp
10,700.00
5,350.00
Rp
3,750.00
Rp
6,000.00
Rp
2,675.00
Rp
Rp
25,000.00
8,500.00
1
2
3
1
2
2
3
4
5
6
7
8
9
10
11
Rp
31,565.00
Rp
Rp
Rp
26,750.00
26,750.00
59,920.00
1
2
1
2
2
3
3
3
4
5
5
PLYWOOD
3.6 MM
PLYWOOD
6 MM
PLYWOOD
9 MM
PLYWOOD JATI
4 MM
TEAKWOOD JATI
4 MM
GYPSUM BOARD
6 MM
GYPSUM BOARD
9 MM
LIST PROFIL KAYU
LIST PROFIL GYPSUM
PIRI-PIRI GRC BOARD T = 6 MM
METAL CLADING
G.
BAHAN PIPA
1
2
3
4
5
6
7
7
8
9
10
11
12
13
14
15
16
STOPKRAN DIA.
3/4 "
KRAN AIR DIA.
1/2 "
KRAN AIR DIA.
3/4 "
PIPA PVC
1/2 "
PIPA PVC
3/4 "
PIPA PVC
1"
PIPA PVC
2"
PIPA PVC
3"
PIPA PVC
4"
ELBOW PVC
4"
SOKET
4"
PIPA BESI (t=2.5mm)GIP 1 "
PIPA BESI (t=2.5mm)GIP 3/4 "
PIPA BESI (t=2.5mm)GIP 1/2 "
PIPA BESI (t=2.5mm) HITAM 2"
PIPA BESI (t=2.5mm) HITAM 3"
PIPA BESI (t=2.5mm) HITAM 4"
H.
1
2
3
4
5
4
5
KLOSET JONGKOK
KLOSET DUDUK
FLOOR DRAIN
CLEAN OUT 0.2" (SARINGAN AIR KOTO
BAK FIBERGLASS 1 M3
WASTAFEL
BAK AIR KAMAR MANDI 220 ITR+C176
LBR.
LBR.
LBR.
LBR.
LBR.
LBR.
LBR.
M'
M'
M2.
M2.
Rp 128,400.00
Rp 142,300.00
Rp
58,850.00
Rp
Rp
24,717.00
24,000.00
BH.
BH.
BH.
M'
M'
M'
M'
M'
M'
BH.
BH.
M'
M'
M'
M'
M'
M'
Rp
Rp
Rp
Rp
Rp
Rp
27,500.00
54,602.00
54,602.00
17,120.00
20,330.00
22,113.00
Rp
Rp
57,245.00
76,326.67
BH.
BH.
BH.
BH.
BH.
BH.
BH.
Rp 192,600.00
Rp 749,000.00
Rp
9,095.00
Rp 376,640.00
Rp 176,550.00
6
7
8
9
10
11
6
7
8
9
10
11
I
1
2
3
4
2
3
4
5
6
8
6
7
11
8
J
1
2
3
2
3
4
5
6
7
8
9
10
11
12
13
9
10
11
12
TEMPAT SABUN
GANTUNGAN HANDUK
KACA KAMAR MANDI
MESIN POMPA AIR
URINOIR
BAK CUCI STAINLESS STEEL / KITCHEN
SEAL TAPE
BATHTUB KOMPLIT
TANKI AIR
0.50 M3
TANKI AIR
1.00 M3
KRAN AIR
STOP KRAN
BH.
BH.
BH.
UNIT
BH.
BH.
BH.
UNIT
BH.
BH.
BH.
BH.
Rp
5,000.00
KG.
KG.
KG.
KG.
KG.
KG.
KG.
KG.
BH.
BH.
KG.
KG.
KG.
KG.
Rp
19,260.00
Rp
Rp
Rp
Rp
Rp
14,980.00
14,980.00
16,050.00
16,050.00
16,050.00
Rp
17,600.00
Rp
16,050.00
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
Rp 197,950.00
BAHAN PAKU
PAKU ATAP GENTENG METAL
PAKU KAYU
PAKU SENG
PAKU ASBES
PAKU SERI
PAKU 2" - 5"
PAKU 5 cm - 12 cm
PAKU 1 Cm - 2,5 Cm
PAKU SKRUP + BAUT + KARET DIA. 8"
ANGKER BESI
BESI STRIP 2"
PAKU GYPSUM
PAKU TRIPLEKS / TEAKWOOD
SKRUP FIXER
BAHAN KACA
1
2
3
4
3
KACA BENING
3 MM
M2.
KACA BENING
5 MM
M2.
KACA BENING
8 MM
M2.
ACRYLIC
6 MM
M2.
KACA NAKO ( RANGKA 9 DAUN + BESI UNIT
Rp
Rp
Rp
Rp
Rp
Rp
Rp
15,000.00
18,000.00
7,500.00
16,050.00
5,350.00
6,420.00
5,350.00
Rp 750,000.00
Rp 423,720.00
Rp 280,000.00
Rp
96,600.00
Rp 154,560.00
Rp 231,840.00
4
5
6
7
8
9
10
11
5
J
1
2
3
4
3
3
4
5
4
5
6
7
8
9
10
10
11
12
12
13
14
M2.
M2.
BH.
M2.
M2.
M2.
M2.
M2.
M'
Rp
14,000.00
BAHAN LISTRIK
TITIK LAMPU (KABEL INSTALASI STAND
LAMPU PIJAR
20 WATT
LAMPU PIJAR
40 WATT
LAMPU NEON (JANTUNG)
35 WATT
LAMPU TL KOMPLIT
1X20 WATT TKI
LAMPU TL KOMPLIT
2X20 WATT TKO
LAMPU TL KOMPLIT
1X40 WATT TKI
LAMPU TL KOMPLIT
2X40 WATT TKO
STOP KONTAK BIASA
STOP KONTAK AC
PANEL BOX
SAKLAR TRIPLE
( STANDARD PLN)
SAKLAR GANDA ( STANDARD PLN)
SAKLAR TUNGGAL ( STANDARD PLN)
LAMPU PHILIPS XL SAVE ENERGY 25 W
LAMPU DOWN LIGHT KOMPLIT 20 WATT
LAMPU BARET KOMPLIT 20 WATT
LAMPU HIAS TANAM KOMPLIT
PANEL MCB KOMPLIT
( STANDA
EXHAUSST VAN BESAR
EXHAUSST VAN KECIL
BAHAN PINTU
1
2
3
4
5
6
1
2
3
4
5
5
2
3
6
7
BAHAN FINISHING
1
2
3
2
TTK.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
BH.
UNIT
UNIT
BH.
BH.
BH.
BH.
LBR.
LBR.
LBR.
LBR.
LBR.
LBR.
M2.
M'
Lbr
Lbr
M'
M'
KG.
KG.
KG.
KG.
Rp 179,760.00
Rp
14,606.00
Rp 231,655.00
Rp
16,853.00
Rp
22,000.00
Rp1,650,000.00
Rp
38,520.00
Rp
24,610.00
Rp
12,840.00
Rp
53,500.00
Rp 180,830.00
Rp
55,000.00
Rp 696,570.00
Rp1,699,000.00
Rp 745,000.00
Rp
69,550.00
Rp
28,890.00
3
4
5
6
6
7
8
8
9
10
9
10
10
11
11
12
13
12
13
13
14
15
16
CAT VERNISH
KG.
CAT KAYU DASAR / MENI
KG.
MINYAK CAT
LTR.
RESIDU
KG.
DEMPUL
KG.
PLAMIR
KG.
CAT ATAP SENG / GENTENG
KG.
KERTAS PASIR / AMPLAS
LBR.
PLITUR
LTR.
TEMPAT ADUKAN CAT
BH.
TEPUNG PENGISI NAT KERAMIK
KG.
TEPUNG PENGISI NAT GYPSUM / CORNI KG.
KUAS 3"
BH.
KUAS GULUNG / ROL
BH.
MINYAK BEKISTING
LTR.
SODA API
KG.
SABUN
BH.
LEM KAYU
KG.
LEM KAYU FOX
LTR.
BATACOTE
KG.
WALLPAPER
M2.
CAT IMPRA
KG.
CAT EXTERIOR ( WEATHER SHIELD)
KG.
O.
BAJA RINGAN
1
2
3
4
5
6
KG.
KG.
KG.
PC.
PC.
PC.
Rp
Rp
Rp
27,500.00
16,050.00
5,350.00
Rp
Rp
18,000.00
16,030.00
Rp
2,500.00
Rp
3,210.00
Rp
15,000.00
Rp
7,490.00
Rp
2,140.00
Rp
7,500.00
PANGKALAN KURAS