Anda di halaman 1dari 67

PENGUJIAN BERAT JENIS TANAH

JUDUL PEKERJAAN

LOKASI PEKERJAAN

NOMOR BORING

KEDALAMAN

TANGGAL PENGUJIAN

DIUJI OLEH

:
LANGKAH PENGUJIAN

BERAT PIKNOMETER + TANAH

SATUAN
W1

BERAT PIKNOMETER

W2

BERAT TANAH

W T = W1 W2

HASIL
1

gr

45.28

44.46

gr

40.84

38.88

gr

4.44

5.58

SUHU t C
BERAT PIKNOMETER + AIR + TANAH

29

29

W3

gr

142.62

141,44

BERAT PIKNOMETER + AIR PADA t C

W4

gr

139.9

138.02

BERAT JENIS Gs PADA SUHU t C


WT / (WT + (W4 W3))

2.58

2.58

(BJ air tC) / (BJ air 27,5 C)

0.9996

0.9996

BERAT JENIS Gs PADA SUHU 27,5 C

2.58

2.58

RERATA BERAT JENIS Gs PADA SUHU 27.5 C

2.58

UJI KADAR AIR PADA SAMPEL TANAH


JUDUL PEKERJAAN

:UJI KADAR AIR

LOKASI PEKERJAAN

NOMOR BORING

KEDALAMAN

:60

TANGGAL PENGUJIAN

DIUJI OLEH

LANGKAH PENGUJIAN

SATUAN

NOMOR CAWAN

HASIL PERHITUNGAN
1

BERAT CAWAN

W1

gr

6.98

6.98

BERAT CAWAN + TANAH BASAH

W2

gr

23.86

15.24

BERAT CAWAN + TANAH KERING

W3

gr

19.96

13.32

W W = W2 - W3

gr

3.9

1.92

BERAT TANAH KERING


WS = W3 - W1
KADAR AIR
= WW / WS x 100%

gr

12.98

6.34

30.05

30.28

RATA-RATA ()

BERAT AIR

30.17

PHYSICAL PROPERTIES OF SOIL


JUDUL PEKERJAAN

LOKASI PEKERJAAN

NOMOR BORING

KEDALAMAN

JENIS SAMPEL

: SAMPEL TERGANGGU / TIDAK TERGANGGU

TANGGAL PENGUJIAN :
DIUJI OLEH

LANGKAH PENGUJIAN

PERHITUNGAN

SATUAN

HASIL

KISARAN

BERAT RING

W1

gr

39.86

39.86

BERAT CAWAN

W2

gr

BERAT RING + CAWAN + TANAH BASAH

W3

gr

175.37

180.3

BERAT TANAH BASAH

W = W3 W1 W 2

gr

135.51 140.44

VOLUME RING (VOLUME TANAH BASAH)

BERAT VOLUME TANAH BASAH

b = W / V

BERAT RING + CAWAN + TANAH KERING

W4

gr

BERAT TANAH KERING

WS = W4 W1 W 2

gr

104.74

111.98

BERAT AIR

WW = W W S

gr

30.77

28.46

KADAR AIR

= WW / WS x 100%

29.38

25.42

BERAT VOLUME TANAH KERING

d = b / (1 + )

gr/ cm3

1.38

1.47

HASIL PENGUJIAN BERAT JENIS

Gs

VOLUME TANAH KERING


VOLUME PORI
DERAJAT KEJENUHAN

cm3

75.97

75.98

gr/ cm3

1.784

1.848

144.6 151.84

2.58

2.58

VS = W S / G s

cm

40.60

43.40

VV = V V S

cm3

35.37

32.58

VW = WW / w

cm

30.77

28.46

0<<

Sr = VW / VV x 100%

87.00

87.36 0 Sr 100

POROSITAS

n = VV / V x 100%

46.56

42.88 0 < n < 100

ANGKA PORI

e = VV / VS

0.87

0.75

0<e<

ANALISIS PENGENDAPAN / HIDROMETER

Tanggal Pengujian

26-Aug-13
Mulai pukul 14.30

27-Aug-13

Waktu
Pembacaan

Waktu T
(menit)

14.30
14.35
14.50
15.20
16.20
20.37
14.30

2
5
15
30
60
250
1440

Pembacaan Pembacaan
hydrometer hydrometer
dalam
dalam cairan
suspensi R1
R2

31
25
22
15
12
7
1

-1
-1
-1
-1
-1
-1
-1

Temp t
(oC)

27
28
27
28
28
28
28

Pembacaan
hidrometer
terkoreksi Kedalaman
(cm)
meniscus
R=R1+m

32
26
23
16
13
8
2

11.0
12.0
12.5
13.7
14.2
15.0
16.0

Harga K

Diameter
butir (D)
mm

Pembacaan
hydrometer
terkoreksi
R=R1-R2

0.01285
0.01271
0.01285
0.01271
0.01271
0.01271
0.01271

0.030210
0.019722
0.011745
0.008583
0.006177
0.003113
0.001339

32
26
23
16
13
8
2

ANALISIS SARINGAN BUTIRAN PASIR (SETELAH ANALISA PENGENDAPAN)


BERAT
TERTAHAN
SARINGAN
(gr)

BERAT
LEWAT
SARINGAN
(gr)

SARINGAN

DIAMETER
BUTIR (D)
(mm)

No. 200

0.075

1.02

58.33

96.25

No. 140

0.106

1.22

59.35

97.94

No. 60

0.250

0.02

60.57

99.95

60.6

No. 40

0.425

0.01

60.59

99.98

57.68

No. 20

0.850

0.00

60.60

100.00

No. 10

2.000

0.00

60.60

100.00

Berat butiran lebih kecil 0,075 mm

58.33

Jumlah

60.60

2.92

PERSEN
LEWAT
SARINGAN

0.00

58.685

1.01

Persen
berat lebih
kecil P (%)

53.333
43.333
38.333
26.667
21.667
13.333
3.333

1.005

UJI PENENTUAN BATAS CAIR


JUDUL PEKERJAAN

LOKASI PEKERJAAN

NOMOR BORING

KEDALAMAN

TANGGAL PENGUJIAN

DIUJI OLEH

LANGKAH PENGUJIAN

HASIL PERHITUNGAN

SATUAN

BANYAKNYA KETUKAN

33

27

21

13

NOMOR CAWAN

BERAT CAWAN

W1

gr

6.78

6.82

6.96

6.94

BERAT CAWAN + TANAH BASAH

W2

gr

15.64

16.76

20.16

20.96

BERAT CAWAN + TANAH KERING

W3

gr

12.28

12.92

14.98

15.28

W W = W 2 - W3

gr

3.36

3.84

5.18

5.68

BERAT TANAH KERING


W S = W3 - W 1
KADAR AIR
= WW / WS x 100%

gr

5.50

6.10

8.02

8.34

61.09

62.95

64.59

68.11

Kadar air (w) dalam %

BERAT AIR

GRAFIK UJI BATAS CAIR (LL)


70.00
69.00
68.00
67.00
66.00
65.00
64.00
63.00
62.00
61.00
60.00
59.00
58.00
57.00
56.00
55.00

f(x) = -7.400272151 ln(x) + 87.1281470607


R = 0.9972456718

10

25

100

Jumlah ketukan (n)

PERSAMAAN GARIS LINEAR y = a.Ln(n) + b

a=
b=

87.13
-17.04

KADAR AIR PADA JUMLAH KETUKAN 25 KALI


BATAS CAIR

(LL)

63.31 %
63.31 %

UJI PENENTUAN BATAS PLASTIS


JUDUL PEKERJAAN

LOKASI PEKERJAAN

NOMOR BORING

KEDALAMAN

TANGGAL PENGUJIAN

DIUJI OLEH

:
LANGKAH PENGUJIAN

SATUAN

HASIL
PERHITUNGAN
1

NOMOR CAWAN
BERAT CAWAN

W1

gr

6.64

6.78

BERAT CAWAN + TANAH BASAH

W2

gr

7.66

8.04

BERAT CAWAN + TANAH KERING

W3

gr

7.44

7.78

W W = W2 - W3

gr

0.22

0.26

BERAT TANAH KERING


W S = W3 - W1
KADAR AIR
= WW / WS x 100%

gr

0.80

1.00

27.50

26.00

BERAT AIR

RATA-RATA KADAR AIR

()

BATAS PLASTIS

(PL)

BATAS CAIR

(LL)

INDEKS PLASTISITAS

PI = LL - PL

26.75

26.75

63.31

36.56

UJI PENENTUAN BATAS SUSUT


JUDUL PEKERJAAN

LOKASI PEKERJAAN

NOMOR BORING

KEDALAMAN

TANGGAL PENGUJIAN

DIUJI OLEH

:
LANGKAH PENGUJIAN

SATUAN

NOMOR MONEL DISH

HASIL PERHITUNGAN
1

BERAT MONEL DISH

W1

gr

46.64

47.74

BERAT MONEL DISH + TANAH BASAH

W2

gr

74.32

76.88

BERAT MONEL DISH + TANAH KERING

W3

gr

66.4

69.12

W W = W2 - W3

gr

7.92

7.76

BERAT TANAH BASAH

W = W2 - W1

gr

27.68

29.14

BERAT TANAH KERING

WS = W3 - W1

gr

19.76

21.38

cm3

14.60

16.53

cm3

10.01

12.37

40.08

36.30

16.83

16.84

BERAT AIR

VOLUME TANAH BASAH

VOLUME TANAH KERING


V0
KADAR AIR
= WW / WS x 100%
BATAS SUSUT
SL = [ ((V V0) / W s.w )] x 100%
RATA-RATA SL

16.84

UJI GESER LANGSUNG


JUDUL PEKERJAAN
LOKASI PEKERJAAN
NOMOR BORING
JENIS SAMPEL
DESKRIPSI TANAH
KEDALAMAN
TANGGAL PENGUJIAN
DIUJI OLEH

:
:
:
: TANAH ASLI / HASIL PEMADATAN
:
:
:
:

DIA. CINCIN (cm) =


No. PENGUJIAN
GAYA NORMAL P (kg)
TEG. NORMAL (kg/cm2)

6.50

Tegangan geser (kg/cm2)

TEG. GESER (kg/cm2)

1.00

2
2
0.0602
0.27

3
4
0.1204
0.33

6
0.1807
0.41

f(x) = 1.1694126281x + 0.1941199641


R = 0.9859102517

0.75

0.50

0.25

0.00
0.0000

0.2500

0.5000
0.7500
1.0000
Tegangan normal (kg/cm2)

PERSAMAAN REGRESI y = ax + b
KOHESI (c)
SUDUT GESER DALAM (

1.2500

a=

1.241

b=
0.1826 kg/cm
51.14

0.1826
2

1.5000

PENGUJIAN PEMADATAN TANAH


JUDUL PEKERJAAN

LOKASI PEKERJAAN

JENIS MATERIAL

SUMBER MATERIAL

TANGGAL PENGUJIAN

DIUJI OLEH

BERAT JENIS TANAH (Gs) =

2.580

LANGKAH PENGUJIAN

NOMOR PENGUJIAN
3

30.39

30.39

30.39

30.39

30.45

30.93

32.01

34.17

85

135

185

235

SATUAN

KADAR AIR MULA

(0)

KADAR AIR AKHIR

()

PENAMBAHAN AIR

(c)

cc

BERAT VOLUME
BERAT PROCTOR

(W 4)

gr

1771

1771

1771

1771

B.TANAH BASAH + PROCTOR

(W 5)

gr

3383

3440

3472

3459

gr

1612

1669

1701

1688

929.230

929.230

929.230

929.230

1.73

1.80

1.83

1.82

BERAT TANAH BASAH

W = W 5 W4

VOLUME CETAKAN

(V)
b= W/V

BERAT VOLUME BASAH

cm3
gr/cm

KADAR AIR
B.TANAH BASAH + CAWAN

(W 1)

gr

24.24 23.00 21.36 24.88 18.56 20.90 25.58

B.TANAH KERING + CAWAN

(W 2)

gr

19.68

18.80 17.50 20.22 15.34 16.98 20.28

W W = W1 W2

gr

4.56

4.20

(W 3)

gr

W S = W2 W3

gr

14.86 13.90 12.60 14.92 10.20 12.08 15.44

= WW / WS x 100%

30.69 30.22 30.63 31.23 31.57 32.45 34.33

BERAT AIR
BERAT CAWAN
BERAT TANAH KERING
KADAR AIR

KADAR AIR RATA-RATA

4.82

4.90

3.86

4.66

4.90

30.45

30.93

5.30

3.22

3.92

5.14

4.90

5.30
4.84

32.01

34.17

1.39

1.35

BERAT VOLUME KERING


BERAT VOLUME KERING

d = b /(1+)

gr/cm3

1.33

PERHITUNGAN ZAV

1.37

Berat volume kering (gd)

BERAT VOLUME KERING ZAV

(d)

gr/cm3

1.44

1.43

1.41

1.37

GRAFIK STANDAR PROCTOR


1.70
1.65
1.60
1.55
1.50
Z.A.V

1.45

dmaks
1.40
1.35
1.30

1.25
1.20
30.00

31.00

32.00
opt

33.00

34.00
Kadar air (w)

35.00

CARA PEMADATAN
BERAT VOLUME KERING MAKSIMUM
KADAR AIR OPTIMUM
95% KEPADATAN KERING MAKSIMUM

(dmaks)
(opt)
(95%.dmaks)

36.00

37.00

38.0

PENGUJIAN
4

30.39

30.39

34.17

36.82

235

285

1771

1771

3459

3415

1688

1644

929.230

929.230

1.82

1.77

23.20 30.46 28.36


18.54 23.54 22.08
4.66
4.84

6.92

6.28

4.94

4.84

13.70 18.60 17.24


34.01 37.20 36.43
34.17

36.82

1.35

1.29

1.37

36.00

1.32

37.00

38.00

STANDARD
1.39

gr/cm3

32.0

1.32

gr/cm3

UJI KEPADATAN DI LAPANGAN DENGAN SAND CONE


JUDUL PEKERJAAN

LOKASI PEKERJAAN

JENIS MATERIAL

TIPE KONSTRUKSI

TANGGAL PENGUJIAN

DIUJI OLEH

:
LANGKAH PENGUJIAN

SATUAN

PERHITUNGAN BERAT VOLUME TANAH BASAH


NOMOR CAWAN

BERAT PASIR + BOTOL + CORONG

W6

gr

9200

BERAT SISA PASIR + BOTOL + CORONG

W7

gr

3996

BERAT PASIR DI DALAM CORONG + LUBANG

W 6 W7

gr

5204

HASIL KALIBRASI BERAT PASIR DI DALAM CORONG

W 4 W5

gr

1660

gr

3544

gr/cm3

1.61

cm3

2198.62

BERAT PASIR DI DALAM LUBANG


HASIL KALIBRASI BERAT VOLUME PASIR

W 10 = (W6W7) (W4W5)
p = (W3W1) / (W 2W1)
V = W 10 / p

VOLUME PASIR DI DALAM LUBANG


BERAT TANAH BASAH

W = W 8 W9
b = W / V

BERAT VOLUME TANAH BASAH

gr
gr/cm

3219
3

1.46

PERHITUNGAN KADAR AIR PADA SAMPEL TANAH


BERAT CAWAN

gr

5.96

BERAT CAWAN + TANAH BASAH

gr

42

BERAT CAWAN + TANAH KERING

gr

33.28

BERAT AIR

gr

8.72

gr

27.32

31.92

BERAT TANAH KERING


KADAR AIR

()

PERHITUNGAN BERAT VOLUME TANAH KERING


dlap = b / (1 + )

BERAT VOLUME TANAH KERING

gr/cm3

1.11

PERHITUNGAN DERAJAT KEPADATAN TANAH TIMBUNAN


BERAT VOLUME TANAH KERING MAKSIMUM dmaks
DERAJAT KEPADATAN

D = dlap / dmaks x 100%

gr/cm3

1.39

79.85

CONE

HASIL

2
9200
3996
5204
1660
3544
1.61
2198.62
3219
1.46

6.52
34.44
27.76
6.68
21.24
31.45

1.11

NAN
1.39
80.13

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

: CALIFORNIA BEARING RATIO


: E3 - LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
:
: 10 April 2015
: KELOMPOK 9

DATA CBR

METODE PEMADATAN
Tinggi Mold, t mold (cm)
Diamater Mold, D mold (cm)
Volume Mold (cm )
3

Berat Mold, W mold (gr)

UNSOAKED

SOAKED

10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan


11.5

17.5

17.5

17.8

17.7

17.7

15

15.25

15.25

15.55

15.53

15.56

2031.19

3194.83

3194.83

3378.71

3351.09

3364.05

5664

5664

5664

3888.5

5520

4443.5

SEBELUM PENGUJIAN

METODE PEMADATAN

UNSOAKED

SOAKED

10 Pukulan 25 Pukulan 56 Pukulan 10 Pukulan 25 Pukulan 56 Pukulan

Berat Mold+Tanah Basah (gr)

9892.5

10612

11327

8917.5

11097

10509

Berat Tanah Basah (gr)

4228.5

4948

5663

5029

5577

6065.5

2.08

1.55

1.77

1.49

1.66

1.80

Berat isi, (gr/cm3)

56 Pukulan

56 Pukulan

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

: CALIFORNIA BEARING RATIO


: E3 - LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
:
: 3 JUNI 2014
: KELOMPOK 9

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

UNSOAKED-TIDAK TERENDAM
Penurunan

Tekanan (Psi)

(menit) (milimeter)
0.00
0.0000
0.25
64.0000
0.50
127.0000
0.75
191.0000
1.00
254.0000
1.25
318.0000
1.50
381.0000
1.75
445.0000
2.00
510.0000
2.25
572.0000
2.50
635.0000
2.75
699.0000
3.00
672.0000

10 Pukulan
Pembacaan Arloji
Load
(diviasi)
(lbs)
(Psi)
0.000
0.000
0.000
0.000
0.000
0.000
0.100
3.581
1.177
0.200
7.141
2.346
0.200
7.141
2.346
0.200
7.141
2.346
0.500
17.785
5.844
0.600
21.325
7.007
0.600
21.325
7.007
0.500
17.785
5.844
0.100
3.581
1.177
0.300
10.694
3.514
0.200
7.141
2.346

8.000
7.500
7.000
6.500
6.000
5.500
5.000
4.500
4.000
3.500
3.000
2.500
2.000
1.500
1.000
0.500
0.000

25 Pukulan
Pembacaan Arloji
Load
(diviasi)
(lbs)
(Psi)
2.300
0.000
0.000
4.000
141.040 46.343
4.800
169.119 55.569
5.500
193.671 63.636
6.000
211.201 69.396
6.500
228.724 75.153
6.500
228.724 75.153
6.300
221.715 72.851
6.800
239.235 78.607
6.800
239.235 78.607
7.000
246.241 80.909
7.000
246.241 80.909
4.700
165.610 54.416

Grafik CBR 10 Pukulan

100.0000
300.0000
500.0000
700.0000
0.0000
200.0000
400.0000
600.0000
Penetrasi (Milimeter)

100.000
Tekanan (Psi)

Waktu

56 Pukulan
Pembacaan Arloji
Load
(Psi)
(diviasi)
(lb)
0.000
0.000
0.000
1.500
53.108 17.450
2.800
98.876 32.489
3.200
112.938 37.109
3.900
137.529 45.189
4.100
144.551 47.496
4.600
162.101 53.263
5.000
176.135 57.874
5.700
200.684 65.940
6.000
211.201 69.396
6.200
218.211 71.699
6.500
228.724 75.153
7.000
246.241 80.909

Grafik CBR 25 Pukulan

80.000

60.000

40.000

20.000

0.000

100.0000
300.0000
500.0000
700.0000
0.0000
200.0000
400.0000
600.0000
Penetrasi (Milimeter)

0.0000
300.0000
500.0000
700.0000
200.0000
400.0000
600.0000
Penetrasi (Milimeter)

Tekanan (Psi)

Grafik CBR 25 Pukulan

100.000

Grafik CBR 56 Pukulan

80.000
60.000
40.000
20.000
0.000
0.0000

100.0000
300.0000
500.0000
700.0000
200.0000
400.0000
600.0000
Penetrasi (Milimeter)

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

JUDUL PEKERJAAN

: CALIFORNIA BEARING RATIO

LOKASI PEKERJAAN

: E3 - LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL

SUMBER MATERIAL

TANGGAL PENGUJIAN

: 10 April 2015

DIUJI OLEH

: KELOMPOK 9

PEMERIKSAAN KADAR AIR-UNSOAKED

Langkah Pengujian

Satuan

Nomor Cawan

10 Pukulan

25 Pukulan

56 Pukulan

Cawan, W1

gr

4.9

4.8

5.6

4.86

4.84

Cawan+tanah basah, W2

gr

23.01

27.17

22.01

20.51

29.47

28.94

Cawan+tanah kering, W3

gr

19.06

24.5

19.8

16.94

25.07

23.71

Tanah basah, W4=W2-W1

gr

18.11

22.37

17.01

14.91

24.61

24.1

Tanah kering, W5=W3-W1

gr

14.16

19.7

14.8

11.34

20.21

18.87

Berat air, W6=W4-W5

gr

3.95

2.67

2.21

3.57

4.4

5.23

27.90

13.55

14.93

31.48

21.77

27.72

Kadar Air, w=(W6/W5)x100%


Kadar air rata-rata waverage
Berat tanah basah

gr

20.72

23.21

24.74

4228.5

4948

5663

Berat volume basah, b

gr/cm3

2.08

1.55

1.77

Berat volume kering, dry

gr/cm

1.72

1.26

1.42

1.72

1.26

1.42

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

: CALIFORNIA BEARING RATIO


: E3 - LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
:
: 3 JUNI 2014
: KELOMPOK 9

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

GRAFIK UNSOAKED-10 PUKULAN

Grafik CBR 10 Pukulan

Tekanan (Psi)

40.000
35.000
30.000
25.000
20.000
15.000
10.000
5.000

-0.1000

0.000
0.0000

0.1000
0.2000
Penetrasi (Inchi)

Penurunan Pembacaan beban


(inchi)
(Psi)
0.1000
2.3465
0.2000
7.0070

CBR
(%)
0.2346
0.4671

0.3000

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

: CALIFORNIA BEARING RATIO


: E3 - LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
:
: 3 JUNI 2014
: KELOMPOK 9

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

GRAFIK UNSOAKED-25 PUKULAN

Grafik CBR 25 Pukulan

60.000
Tekanan (Psi)

55.000
50.000
45.000
40.000
35.000
30.000
25.000
20.000
15.000
10.000
5.000
-0.1000

0.000
0.0000

0.1000
0.2000
Penetrasi (Inchi)

Penurunan Pembacaan beban


(inchi)
(Psi)
0.1000
69.3957
0.2000
78.6072

CBR
(%)
6.9396
5.2405

0.3000

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

: CALIFORNIA BEARING RATIO


: E3 - LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
:
: 3 JUNI 2014
: KELOMPOK 9

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

GRAFIK UNSOAKED-56 PUKULAN

Tekanan (Psi)

Grafik CBR 56 Pukulan

-0.1000

0.0000

0.1000
0.2000
Penetrasi (Inchi)

Penurunan Pembacaan beban


(inchi)
(Psi)
0.1000
45.1889
0.2000
65.9402

CBR
(%)
4.5189
4.3960

0.3000

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

Berat volume kering (gd)

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

GRAFIK STANDAR PROCTOR


1.70
1.65
1.60
1.55
1.50

Z.A.V

1.45
1.40
1.35
1.30
1.25
1.20
1.15
1.10
1.05
1.00
30.00

CBR
0.235
6.940
4.519

31.00

32.00

33.00

34.00
35.00
Kadar air (w)

36.00

Berat Volume
1.72

1.165

1.060

1.26

1.861

1.209

1.42

3.364

1.388

37.00

38.00

NIK SIPIL

37.00

CBR DESIGN
1.70
1.65
1.60
Berat volume kering (d)

1.55
1.50
1.45
1.40

d max
95 % d max

1.35
1.30
1.25
1.20
1.15
1.10
1.05

38.00

1.00
0.000 1.000 2.000 3.000 4.000 5.000 6.000
CBR (%)

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

SOAKED-TERENDAM
Waktu

Penurunan

(menit)
0.00
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00

(inchi)
0.0000
0.0250
0.0500
0.0750
0.1000
0.1250
0.1500
0.1750
0.2000
0.2250
0.2500
0.2750
0.3000

10 Pukulan
Pembacaan Arloji
(diviasi)
0.000
0.400
0.600
0.800
1.000
1.150
1.300
1.400
1.450
1.600
1.700
1.800
1.900

Penurunan
(inchi)
0.1000
0.2000

25 Pukulan
Load

(lbs)
0.000
14.241
21.325
28.399
35.466
40.762
46.055
49.582
51.346
56.634
60.158
63.681
67.204

(Psi)
0.000
4.679
7.007
9.331
11.653
13.393
15.133
16.292
16.871
18.609
19.767
20.924
22.082

Pembacaan beban
(Psi)
11.6533
16.8710

CBR
(%)
1.1653
1.1247

Pembacaan Arloji
(diviasi)
0.000
0.600
1.000
1.300
1.600
1.800
1.900
2.000
2.100
2.200
2.300
2.400
2.400

GRAFIK CBR 10 PUKULAN

20.000

15.000

10.000

5.000

Tekanan (Psi)

Tekanan (Psi)

25.000

10.000

5.000

-0.1000

0.000
0.0000

0.1000
Penetrasi (Inchi)

0.2000

0.3000

-0.1000

G RATIO (CBR) ASTM D1883

USAN TEKNIK SIPIL

25 Pukulan
(lbs)
0.000
21.325
35.466
46.055
56.634
63.681
67.204
70.726
74.247
77.767
81.287
84.806
84.806

(Psi)
0.000
7.007
11.653
15.133
18.609
20.924
22.082
23.239
24.396
25.553
26.709
27.865
27.865

56 Pukulan
Pembacaan Arloji
Load
(diviasi)
(lbs)
(Psi)
0.000
0.000
0.000
1.000
35.466
11.653
1.800
63.681 20.924
2.400
84.806 27.865
2.900
102.392 33.644
3.200
112.938 37.109
3.500
123.480 40.573
3.900
137.529 45.189
4.200
148.062 48.650
4.700
165.610 54.416
5.100
179.643 59.027
5.400
190.165 62.484
5.500
193.671 63.636

Pembacaan beban
(Psi)
18.6085
24.3958

CBR
(%)
1.8609
1.6264

Pembacaan bebanCBR
(Psi)
(%)
33.6438 3.3644
48.6498 3.2433

Load

GRAFIK CBR 25 PUKULAN

GRAFIK CBR

25.000

20.000

70.000

Tekanan (Psi)

Tekanan (Psi)

30.000

65.000
60.000
55.000
50.000
45.000
40.000

15.000

35.000
30.000

10.000

25.000
20.000

5.000

15.000
10.000

30.000
10.000

25.000
20.000
15.000

5.000

10.000
-0.1000

0.000
0.0000

5.000
0.1000
Penetrasi (Inchi)

0.2000

0.3000

-0.1000

0.000
0.0000

0
Pene

GRAFIK CBR 56 PUKULAN


Tekanan (Psi)

70.000
65.000
60.000
55.000
50.000
45.000
40.000
35.000
30.000
25.000
20.000
15.000
10.000

30.000
25.000
20.000
15.000
10.000
5.000
-0.1000

0.000
0.0000

0.1000
0.2000
Penetrasi (Inchi)

0.3000

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH
VOLUME PENGEMBANGAN
SOAKED-TERENDAM
Waktu
(t)
0.0
1.0
1.4
2.0
2.8
3.5
4.9
6.0
6.9
8.5
9.8

5.00

10 Pukulan
25 Pukulan
56 Pukulan
Bacaan
cm
Pengembangan Bacaan
cm
Pengembangan Bacaan
cm
Pengembangan
Dial (0.001")
(s)
(%) (s/H) Dial (0.001")
(s)
(%) (s/H) Dial (0.001")
(s)
(%) (s/H)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
117.00
22.00
1.00
0.30
2.57
0.06
0.48
0.00
0.02
118.00
43.00
4.50
0.30
2.59
0.11
0.95
0.01
0.10
121.00
58.50
8.00
0.31
2.66
0.15
1.29
0.02
0.18
122.00
68.00
11.00
0.31
2.68
0.17
1.50
0.03
0.24
122.00
73.00
12.00
0.31
2.68
0.19
1.61
0.03
0.26
122.00
77.20
18.00
0.31
2.68
0.20
1.70
0.05
0.40
122.80
79.20
23.60
0.31
2.70
0.20
1.74
0.06
0.52
124.00
80.50
28.00
0.31
2.73
0.20
1.77
0.07
0.62
126.00
82.00
32.00
0.32
2.77
0.21
1.80
0.08
0.70
126.00
83.00
34.00
0.32
2.77
0.21
1.83
0.09
0.75

VOLUME PENGAMBANGAN
10 PUKULAN

olu m e P e ng am bang an (% )

olum e P e ng am bang an (% )

Waktu
(jam)
(t)
0
1
2
4
8
12
24
36
48
72
96

2.00

VOLUME PENGAMBANGAN
25 PUKULAN

Volu m e P e ng am ban

4.50
4.00

VOLUME PENGAMBANGAN
25 PUKULAN

2.00

1.50

3.50
3.00
2.50

1.00

2.00
1.50

0.50

1.00
0.50
0.00
0.0

2.0

4.0

6.0
t

Volum e P e ng am bang an (% )

Volum e P e ng am ba

5.00

VOLUME PENGAMBANGAN
10 PUKULAN

1.00

8.0

10.0

12.0

0.00
0.0

2.0

4.0

VOLUME PENGAMBANGAN
56 PUKULAN

0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0.0

2.0

4.0

6.0
t

8.0

10.0

12.0

6.0
t

8.0

0.20
0.10
0.00
0.0

2.0

4.0

6.0
t

8.0

10.0

12.0

11.55

olu m e P e ng am bang an (% )

Pengembangan

2.00

VOLUME PENGAMBANGAN
25 PUKULAN

Volu m e P e ng am ban

2.00

VOLUME PENGAMBANGAN
25 PUKULAN

1.50

1.00

0.50

0.00
0.0

2.0

4.0

6.0
t

8.0

10.0

12.0

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

PEMERIKSAAN KADAR AIR-SOAKED


Langkah Pengujian
Nomor Cawan
Cawan, W1
Cawan+tanah basah, W2
Cawan+tanah kering, W3
Tanah basah, W4=W2-W1
Tanah kering, W5=W3-W1
Berat air, W6=W4-W5
Kadar Air, w=(W6/W5)x100%
Kadar air rata-rata waverage

Satuan

10 Pukulan

25 Pukulan

56 Pukulan

1
2
5.42
5.18
23.81
22.3
18.75
17.64
18.39
17.12
13.33
12.46
5.06
4.66
37.96
37.40
37.68
5577
1.66

1
2
4.96
4.89
22.39
23.4
18.23
19.3
17.43
18.51
13.27
14.41
4.16
4.1
31.35
28.45
29.90
6065.5
1.80

1.21

1.39

Berat tanah basah


Berat volume basah, b

gr
gr/cm3

1
2
4.95
4.88
25.67
23.09
19.89
17.68
20.72
18.21
14.94
12.8
5.78
5.41
38.69
42.27
40.48
5029
1.49

Berat volume kering, dry

gr/cm3

1.06

gr
gr
gr
gr
gr
gr

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

GRAFIK SOAKED-10 PUKULAN

GRAFIK CBR 10 PUKULAN


Tekanan (Psi)

25.000

20.000

15.000

10.000

5.000

-0.1000

0.000
0.0000

0.1000
0.2000
Penetrasi (Inchi)

Penurunan Pembacaan beban


(inchi)
(Psi)
0.1000
11.6533
0.2000
16.8710

CBR
(%)
1.1653
1.1247

0.3000

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

GRAFIK SOAKED-25 PUKULAN

GRAFIK CBR 25 PUKULAN


Tekanan (Psi)

30.000
25.000
20.000
15.000
10.000

5.000

-0.1000

0.000
0.0000

0.1000
0.2000
Penetrasi (Inchi)

Penurunan Pembacaan beban


(inchi)
(Psi)
0.1000
18.6085
0.2000
24.3958

CBR
(%)
1.8609
1.6264

0.3000

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

GRAFIK SOAKED-56 PUKULAN

GRAFIK CBR 56 PUKULAN


70.000

Tekanan (Psi)

65.000
60.000
55.000
50.000
45.000
40.000
35.000
30.000
25.000
20.000
15.000
10.000
5.000
-0.1000

0.000
0.0000

0.1000
0.2000
Penetrasi (Inchi)

Penurunan Pembacaan beban


(inchi)
(Psi)
0.1000
33.6438
0.2000
48.6498

CBR
(%)
3.3644
3.2433

0.3000

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

Volum e P e ng am bang an (% )

VOLUME PENGAMBANGAN SOAKED-10 PUKULAN

5.00

VOLUME PENGAMBANGAN
10 PUKULAN

4.50
4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00
0.0

2.0

4.0

6.0
t

8.0

10.0

12.0

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

Volum e P e ng am bang an (% )

VOLUME PENGAMBANGAN SOAKED-25 PUKULAN

2.00

VOLUME PENGAMBANGAN
25 PUKULAN

1.50

1.00

0.50

0.00
0.0

2.0

4.0

6.0
t

8.0

10.0

12.0

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

Volum e P e ng am bang an (% )

VOLUME PENGAMBANGAN SOAKED-56 PUKULAN

1.00

VOLUME PENGAMBANGAN
56 PUKULAN

0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0.0

2.0

4.0

6.0
t

8.0

10.0

12.0

UJI CALIFORNIA BEARING RATIO (CBR) ASTM D1883

Berat volume kering (gd)

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

GRAFIK STANDAR PROCTOR


1.70
1.65
1.60
1.55
1.50

Z.A.V

1.45
1.40
1.35
1.30
1.25
1.20
1.15
1.10
1.05
1.00
30.00

CBR
1.165
1.861
3.364

31.00

Berat Volume
1.060
1.209
1.388

32.00

33.00

34.00
35.00
Kadar air (w)

36.00

37.00

38.00

CBR DESIGN
1.700
1.650
1.600
Berat volume kering (d)

1.550
1.500
1.450
1.400
1.350
1.300
1.250
1.200
1.150
1.100
1.050
38.00

1.000
0.000

1.000

2.000
CBR (%)

3.000

4.000

UJI KONSOLIDASI (CONSOLIDASI TEST) ASTM D2435

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

Berat jenis tanah, G


Berat cincin, Wc
Diameter cincin

: UJI KONSOLIDASI
: E3-LAB. MEKANIKA TANAH JURUSAN T
: SP.1
: 6 MEI 2014
: KELOMPOK 3 ROMBEL 2

2.58
65.14
6.35

SEBELUM PERCOBAAN
1

KADAR AIR
Berat cawan kosong, W1

6.98

Berat cawan kosong + tanah basah, W2

15.24

Berat cawan kosong + tanah kering, W3

13.32

Kadar air, wo = (W2 - W3) / (W3 - W1) x 100%

30.28

Berat cincin + tanah basah, W4

172.75

(Berat cincin + tanah kering) + berat cawan + berat cincin, Wd


Berat tanah basah, Wb = W4 - Wc

165.38

Berat tanah kering, Wk = W6+W1+WC

93.26

Berat jenis (densitas) tanah kering, Wk / V

1.49

Tinggi bagian padat, Hs = Wk / G.A

1.14

Angka pori, eo = (Ho - Hk) / Hs

0.73

Derajat kekenyangan, So = (wo.G) / eo

107.61

107.63

SETELAH PERCOBAAN
Berat cincin + tanah basah, W6

118.00

Berat cincin + tanah kering, W7


Berat tanah kering, Wk = W6 - Wc

93.26

Kadar air, w1 = (W5 - W6) / Wk x 100%

87.98

Derajat kekenyangan, S1 = (w1.G) / e1

312.68

28.12

SI (CONSOLIDASI TEST) ASTM D2435

: E3-LAB. MEKANIKA TANAH JURUSAN TEKNIK SIPIL

Luas cincin, A
Tinggi cincin, H0
Volume cincin, V

28.12

31.67
1.97
62.39

UJI KONSOLIDASI (CONSOLIDASI TEST) ASTM D2435

: UJI KONSOLIDASI
: E3-LAB. MEKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP.1
: 6 MEI 2014
: KELOMPOK 3 ROMBEL 2

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

DATA PENGUJIAN KONSOLIDASI


Waktu Pembacaan

Pembacaan arloji (mm) untuk beban (kg/cm2)

Tanggal/jam

t0.5

0.75

1.5

12

24

0.75

15:20

0.0

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

5.40"

0.3

0.880

0.106

0.160

0.280

0.435

0.879

0.966

0.790

15.00"

0.5

0.890

0.106

0.163

0.290

0.522

0.895

0.968

0.786

29.40"

0.7

0.900

0.110

0.166

0.380

0.565

0.926

0.960

0.780

15:13

1.00'

1.0

0.910

0.110

0.170

0.311

0.588

0.948

0.957

0.772

15:14

2.25'

1.5

0.920

0.112

0.171

0.318

0.592

0.976

0.954

0.760

15:16

4.00'

2.0

0.920

0.113

0.172

0.323

0.598

0.987

0.948

0.750

15:18

6.25'

2.5

0.920

0.114

0.173

0.328

0.618

0.988

0.943

0.740

15:21

9.00'

3.0

0.930

0.114

0.174

0.332

0.622

0.989

0.940

0.710

15:24

12.25'

3.5

0.930

0.114

0.177

0.335

0.631

0.992

0.932

0.708

15:28

16.00'

4.0

0.930

0.115

0.177

0.335

0.632

0.995

0.935

0.705

15:37

25.00'

5.0

0.930

0.115

0.177

0.341

0.641

0.999

0.930

0.703

15:48

36.00'

6.0

0.920

0.116

0.178

0.344

0.646

1.280

0.928

0.702

16:01

49.00'

7.0

0.910

0.117

0.178

0.348

0.651

1.400

0.925

0.700

16:16

64.00'

8.0

0.900

0.118

0.178

0.350

0.654

1.450

0.924

0.668

16:33

81.00'

9.0

0.900

0.120

0.178

0.352

0.657

1.510

0.922

0.666

16:52

100.00'

10.0

0.900

0.121

0.178

0.353

0.660

1.540

0.920

0.664

17:13

121.00'

11.0

0.890

0.121

0.178

0.354

0.662

1.560

0.918

0.600

17:36

144.00'

12.0

0.890

0.122

0.178

0.356

0.664

1.590

0.916

0.580

18:57

225.00'

15.0

0.880

0.123

0.178

0.358

0.670

1.640

0.910

0.570

20:55

400.00'

20.0

0.960

0.124

0.179

0.346

0.674

1.710

0.907

0.560

15:12

1440.00'

38.0

0.970

0.128

0.267

0.382

0.696

1.940

0.820

0.550

UJI KONSOLIDASI (CONSOLIDASI TEST) ASTM D2435

: UJI KONSOLIDASI
: E3-LAB. MEKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP.1
: 6 MEI 2014
: KELOMPOK 3 ROMBEL 2

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

Menentukan t90, p = 0,75 kg/cm2


Dial
0.75 kgc
0
0.88
0.89
0.9
0.91
0.92
0.92
0.92
0.93
0.93
0.93
0.93
0.92
0.91
0.9
0.9
0.9
0.89
0.89
0.88
0.96
0.97

Vt
0.0
0.3
0.5
0.7
1.0
1.5
2.0
2.5
3.0
3.5
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
15.0
20.0
38.0

0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360

160
400

10
0
11

380
400

160
400
6.5
6.5
Max

100
400
y-A

x-B

Vt90

t90

400

160

10

6.5

42.25

M D2435

NIK SIPIL

0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
0

10

11

12

13

14

15

Menentukan t90, p = 0,25 kg/cm2


Dial

Max
400

y-A
160

x-B
10

Vt90
6.5

Vt
0
0.3
0.5
0.7
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
11
12
15
20
38

t90
42.25

0.25 kgc

0
102
121
133
154
184
208
229
244
254
269
274
285
296
302
305
318
324
327
332
342
374
383
10

0
11
6.5
6.5

0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
0

160
400
160
400
100
400

10

11

12

13

14

15

10

11

12

13

14

15

UJI KONSOLIDASI (CONSOLIDASI TEST) ASTM D2435

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

beban
0.00
0.75
1.50
3.00
6.00
12.00
24.00
6.00
0.75

End dial
0
97
128
267
382
696
1940
1940
2010

dial cm
0.000
0.010
0.013
0.027
0.038
0.070
0.194
0.194
0.201

: UJI KONSOLIDASI
: E3-LAB. MEKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP.1
: 6 MEI 2014
: KELOMPOK 3 ROMBEL 2

dH
0.000
0.010
0.003
0.014
0.012
0.031
0.124
0.000
0.007

de
0.000
0.008
0.003
0.012
0.010
0.028
0.109
0.000
0.006

e
0.726
0.717
0.715
0.703
0.692
0.665
0.556
0.556
0.550

H
1.970
1.960
1.957
1.943
1.932
1.900
1.776
1.776
1.769

d
0.983
0.979
0.975
0.969
0.958
0.919
0.888
0.886

STM D2435

t90(mnt)
16.0
3.6
1.2
4.4
9.0
100.0

cm2/s
cv

cv
x10E4

0.001
0.004
0.011
0.003
0.001
0.000
#DIV/0!
#DIV/0!

8.5
37.6
111.1
30.1
14.4
1.2

UJI CALIFORNIA BEARING RATIO (CBR) ASTM

: CALIFORNIA BEARING RATIO


: E3-LAB. MAKANIKA TANAH JURUSAN TEKNIK SIPIL
: SP 1
: 3 JUNI 2014
: KELOMPOK 3 ROMBEL 2

JUDUL PEKERJAAN
LOKASI PEKERJAAN
SUMBER MATERIAL
TANGGAL PENGUJIAN
DIUJI OLEH

SOAKED-TERENDAM
Waktu

Penurunan

(menit)
0.00
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00

mm
0.0000
0.6350
1.2700
1.9050
2.5400
3.1750
3.8100
4.4450
5.0800
5.7150
6.3500
6.9850
7.6200

10 Pukulan
Pembacaan Arloji
(diviasi)
0.000
2.000
2.500
3.500
4.250
5.100
6.000
6.500
7.000
7.100
8.000
8.600
9.300

Penurunan
(inchi)
0.1000
0.2000

25 Pukulan
Load

(lbs)
0.000
70.726
88.324
123.480
149.817
179.643
211.201
228.724
246.241
249.744
281.261
302.264
326.759
Pembacaan beban
(Psi)
49.2266
80.9093

Pembacaan Arloji
(Psi)
(diviasi)
0.000
0.000
23.239
3.100
29.021
5.300
40.573
7.100
49.227
9.000
59.027
10.200
69.396
11.300
75.153
12.000
80.909
12.500
82.060
12.600
92.416
13.000
99.317
14.000
15.500
107.366
CBR
(%)
4.9227
5.3940

GRAFIK CBR 10 PUKULAN

20.000

15.000

Tekanan (Psi)

Tekanan (Psi)

25.000

Tekanan (

Tekanan (

20.000

15.000

10.000

5.000

-0.1000

0.000
0.0000

0.1000
Penetrasi (Inchi)

0.2000

0.3000

-0.1000

G RATIO (CBR) ASTM D1883

N TEKNIK SIPIL

25 Pukulan

56 Pukulan
Load

(lbs)
0.000
109.423
186.658
249.744
316.262
358.242
396.705
421.173
438.647
442.141
456.118
491.051
543.431

(Psi)
0.000
35.954
61.332
82.060
103.916
117.710
130.348
138.388
144.129
145.278
149.870
161.348
178.559

Pembacaan beban
(Psi)
103.9165
144.1295

CBR
(%)
10.3916
9.6086

Pembacaan Arloji
(diviasi)
0.000
2.000
4.800
7.900
10.500
12.900
15.000
17.100
19.100
20.500
21.000
21.000
20.500

Load
(lbs)
0.000
70.726
169.119
277.760
368.733
452.624
525.974
599.280
669.060
717.888
735.323
735.323
717.888

(Psi)
0.000
23.239
55.569
91.266
121.157
148.722
172.823
196.910
219.838
235.882
241.610
241.610
235.882

Pembacaan beban
CBR
(Psi)
(%)
121.1574
12.1157
219.8380
14.6559

GRAFIK CBR 25 PUKULAN

GRAFIK

25.000

20.000

70.000

Tekanan (Psi)

Tekanan (Psi)

30.000

65.000
60.000
55.000
50.000
45.000
40.000

15.000

35.000

Tekanan (Ps

Tekanan (

25.000

20.000

60.000
55.000
50.000
45.000
40.000

15.000

35.000
30.000

10.000

25.000
20.000
15.000

5.000

10.000
-0.1000

0.000
0.0000

5.000
0.1000
Penetrasi (Inchi)

0.2000

0.3000

-0.1000

0.000
0.0000

GRAFIK CBR 56 PUKULAN


Tekanan (Psi)

70.000
65.000
60.000
55.000
50.000
45.000
40.000
35.000

Tekanan (Ps

60.000
55.000
50.000
45.000
40.000
35.000
30.000
25.000
20.000
15.000
10.000
5.000
-0.1000

0.000
0.0000

0.1000
0.2000
Penetrasi (Inchi)

0.3000

beban (kg/cm2)
0.25
0.5
1
2
4
8

no
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

jam
waktu (menit)
waktu (detik)
dial
18:10:00
0.001
0.06
0.1
6
0.25
15
0.5
30
1
60
2
120
4
240
8
480
15
900
30
1800
60
3600
120
7200
240
14400
480
28800
1380
82800
1560
93600

Luas

kg
31.6
31.6
31.6
31.6
31.6
31.6

1
2
4
8
16
32

deformasi (mm) skala


0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01

kg
8
16
32
63
126
253

pembacaan (detik)
9.6
15
21.6
29.4
38.4
60

0.06
6
15
30
60
120
240
480
900
1800
3600
7200
14400
28800
82800
93600

Anda mungkin juga menyukai