ANALISA HARGA SATUAN PEKERJAAN

NO
A.
1

SNI

ANALISA PEKERJAAN

KODE

PEKERJAAN TANAH
03-2835-2008
6.1

HARGA
SATUAN
(Rp.)

UPAH
PEKERJA
(Rp.)

HARGA
BAHAN
(Rp.)

1 M3 Galian tanah biasa sedalam 1 m


0.7500
oh Pekerja
0.0250
oh Mandor
Jml Total

03-2835-2008

6.2

1 M3 Galian tanah biasa sedalam 2 m


0.9000
oh Pekerja
0.0450
oh Mandor

03-2835-2008

6.9

1 M3 Mengurug tanah kembali ( 1/3 dari indek pek galian )


0.3000
oh Pekerja
0.0150
oh Mandor

03-2835-2008

6.11

1 M3 Urugan pasir
1.2000 m3
0.3000
oh
0.0100
oh

Jml Total

Jml Total
Pasir urug
Pekerja
Mandor
Jml Total
5

03-2835-2008

6.15

1 M3 Urugan tanah + pemadatan


0.2500
oh Pekerja
0.0250
oh Mandor
1.0000
ls Pemadatan

03-2835-2008

6.15

1 M3 Urugan fill + pemadatan


0.2500
oh Pekerja
0.0250
oh Mandor
1.0000
ls Pemadatan

03-2835-2008

6.15

1 M3 Pembuangan tanah sejauh 150 m


0.5160
oh Pekerja
0.0500
oh Mandor

Jml Total

Jml Total

Jml Total
B.
1

C.
1

PEKERJAAN PONDASI
03-2836-2008
6.9

03-2836-2008

6.3

1 M3 Pasang batu kosong / anstamping


1.2000 m3 Batu belah
0.4330 m3 Pasir urug
0.7800
oh Pekerja
0.3900
oh Tukang batu
0.0390
oh Kepala tukang
0.0390
oh Mandor
1 M3 Pasang batu belah 1 Pc : 5 Ps
1.2000 m3 Batu belah
136.0000
kg Portland Cemen ( PC )
0.5440 m3 Pasir pasang
1.5000
oh Pekerja
0.6000
oh Tukang batu
0.0600
oh Kepala tukang
0.0750
oh Mandor

PEKERJAAN DINDING & PLESTERAN


03-6897-2008
6,10
1 M2 Pasang batu bata merah (5x11x22) cm tbl 1/2 bata camp 1 Pc : 5 Ps
70.0000 m3 Batu bata
9.6800
kg Portland Cemen ( PC )
0.0450 m3 Pasir pasang
0.3000
oh Pekerja
0.1000
oh Tukang batu
0.0100
oh Kepala tukang
0.0150
oh Mandor

JUMLAH
(Rp.)

03-2837-2008

6.16

1 M2 Plesteran 1 Pc : 5 Ps- tbl 20 mm


kg Portland Cemen ( PC )
6.9120
0.0350 m3 Pasir pasang
0.2600
oh Pekerja
0.2000
oh Tukang batu
0.0200
oh Kepala tukang
0.0130
oh Mandor

03-2837-2008

6.15

1 M2 Plesteran 1 Pc : 4 Ps- tbl 20 mm


8.3200
kg Portland Cemen ( PC )
0.0320 m3 Pasir pasang
0.2600
oh Pekerja
0.2000
oh Tukang batu
0.0200
oh Kepala tukang
0.0130
oh Mandor

03-2837-2008

6.19

1 M2 Plesteran braben 1 Pc : 5 Ps- tbl 15 mm


5.1840
kg Portland Cemen ( PC )
0.0260 m3 Pasir pasang
0.1500
oh Pekerja
0.0700
oh Tukang batu
0.0070
oh Kepala tukang
0.0080
oh Mandor

03-2837-2008

6,20

1 M' Plesteran skoning 1 : 2 lebar 10 mm


0.5000
kg Portland Cemen ( PC )
0.0130 m3 Pasir pasang
0.0570
oh Pekerja
0.0380
oh Tukang batu
0.0380
oh Kepala tukang
0.0030
oh Mandor

03-2837-2008

6,26

1 M' Memasang finishing siar batu kali 1Pc : 2Ps


6.3400
kg Portland Cemen ( PC )
0.1200 m3 Pasir pasang
0.3000
oh Pekerja
0.1400
oh Tukang batu
0.0140
oh Kepala tukang
0.0150
oh Mandor

03-2837-2008

6,27

1 M2 Memasang acian
3.2500
kg Portland Cemen ( PC )
0.1500
oh Pekerja
0.1000
oh Tukang batu
0.0100
oh Kepala tukang
0.0080
oh Mandor

D.
1

PEKERJAAN LANTAI
03-7395-2008
6.9

03-7395-2008

6.9

1 M2 Lantai keramik polish 60/60 ( Aula ) :


3.0000
bh keramik polish 60x60
14.7000
kg Portland Cemen ( PC )
1.9500
kg PC warna
0.0675 m3 Pasir pasang
0.3750
oh Pekerja
0.1800
oh Tukang batu
0.0180
oh Kepala tukang
0.0195
oh Mandor
1 M2 Lantai keramik unpolish 60/60 ( Aula ) :
3.0000
bh keramik polish 60x60
14.7000
kg Portland Cemen ( PC )
1.9500
kg PC warna
0.0675 m3 Pasir pasang
0.3750
oh Pekerja
0.1800
oh Tukang batu
0.0180
oh Kepala tukang
0.0195
oh Mandor

03-7395-2008

6.9

1 M2 Lantai granito 60/60 ( Aula ) :


3.0000
bh granito 60x60
14.7000
kg Portland Cemen ( PC )
1.9500
kg PC warna
0.0675 m3 Pasir pasang
0.3750
oh Pekerja
0.1800
oh Tukang batu
0.0180
oh Kepala tukang
0.0195
oh Mandor

03-7395-2008

6.9

1 M2 Lantai keramik 40/40 (Polish) :


6.6300
bh keramik 40x40
9.8000
kg Portland Cemen ( PC )
1.3000
kg PC warna
0.0450 m3 Pasir pasang
0.2500
oh Pekerja
0.1200
oh Tukang batu
0.0120
oh Kepala tukang
0.0130
oh Mandor

03-7395-2008

6.9

1 M2 Lantai keramik 40/40 (Un polish) :


6.6300
bh keramik 40x40
9.8000
kg Portland Cemen ( PC )
1.3000
kg PC warna
0.0450 m3 Pasir pasang
0.2500
oh Pekerja
0.1200
oh Tukang batu
0.0120
oh Kepala tukang
0.0130
oh Mandor

03-7395-2008

6.35

1 M2 Lantai keramik unpolish 30/30 :


11.8700
bh Keramik 30x30
10.0000
kg Portland Cemen ( PC )
1.5000
kg PC warna
0.0450 m3 Pasir pasang
0.6200
oh Pekerja
0.3500
oh Tukang batu
0.0350
oh Kepala tukang
0.0300
oh Mandor

03-7395-2008

6.35

1 M2 Lantai keramik 30/30 :


11.8700
bh Keramik 30x30
10.0000
kg Portland Cemen ( PC )
1.5000
kg PC warna
0.0450 m3 Pasir pasang
0.6200
oh Pekerja
0.3500
oh Tukang batu
0.0350
oh Kepala tukang
0.0300
oh Mandor

03-7395-2008

6.54

1 M2 Pasang keramik dinding 20x25 :


21.5000
bh Keramik 20x25
10.4000
kg Portland Cemen ( PC )
1.6200
kg PC warna
0.0450 m3 Pasir pasang
0.6200
oh Pekerja
0.3500
oh Tukang batu
0.0350
oh Kepala tukang
0.0300
oh Mandor

03-7395-2008

6.36

1 M2 Pasang keramik lantai 20x20 :


26.5000
bh Keramik 20x20
10.4000
kg Portland Cemen ( PC )
1.6200
kg PC warna
0.0450 m3 Pasir pasang

0.6200
0.3500
0.0350
0.0300
10

03-7395-2008

11

03-7395-2008

1 M' Pasang keramik border dinidng km/wc 5x30 :


4.000
bh Keramik border 5x30
1.140
kg Portland Cemen ( PC )
0.025
kg PC warna
0.003 m3 Pasir pasang
0.090
oh Tukang
0.009
oh Kepala tukang
0.090
oh Pekerja
0.005
oh Mandor
1 M' Pasang plint kaca rayband 5 mm L = 10 cm
0.1000 m2
Plint kaca rayband 5 mm L = 10 cm
1.1400 kg
Portland Cemen ( PC )
0.090 oh
Pekerja
0.090 oh
Tukang
0.009 oh
Kepala tukang
0.005 oh
Mandor

13

03-7395-2008

14

03-7395-2008

Pekerja
Tukang batu
Kepala tukang
Mandor

1 M' Pasang nozing tangga 5x20 :


5.000 bh
Nozing 5x20
2.600 kg
Portland Cemen ( PC )
0.405 kg
PC warna
0.011 m3
Pasir pasang
0.088 oh
Tukang
0.009 oh
Kepala tukang
0.155 oh
Pekerja
0.008 oh
Mandor

12

E.
1

oh
oh
oh
oh

1 M' Pasang kuku macan 2,5x10 :


10.000 bh
Kuku macan 2,5x10
0.945 kg
Portland Cemen ( PC )
0.147 kg
PC warna
0.004 m3
Pasir pasang
0.032 oh
Tukang
0.003 oh
Kepala tukang
0.056 oh
Pekerja
0.003 oh
Mandor
6.57

PEKERJAAN BETON
03-7394-2008
6.4

03-7394-2008

6.5

1 M2 Pasang batu serit / mortar


1.1000 m2 Batu serit
11.7500
kg Portland Cemen ( PC )
0.0350 m3 Pasir pasang
0.6200
oh Pekerja
0.3500
oh Tukang batu
0.0350
oh Kepala tukang
0.0300
oh Mandor

1 M3 Beton lantai kerja mutu fc = 7,4 Mpa ( K100) slum (3-6) cm w/c = 0,87
230.0000
kg Portland Cemen ( PC )
893.0000
kg Pasir beton
1,024.0000
kg Kerikil (maksimum 30 mm)
200.0000
ltr air
1.2000
oh Pekerja
0.2000
oh Tukang batu
0.0200
oh Kepala tukang
0.0060
oh Mandor
1 M3 Beton mutu fc = 9,8 Mpa ( K175) slum (122) cm w/c = 0,66
326.0000
kg Portland Cemen ( PC )
760.0000
kg Pasir beton
1,029.0000
kg Kerikil (maksimum 30 mm)

215.0000
1.6500
0.2500
0.0250
0.0800

ltr
oh
oh
oh
oh

air
Pekerja
Tukang batu
Kepala tukang
Mandor

03-7394-2008

6.7

1 M3 Beton mutu fc = 19,3 Mpa ( K225) slum (122) cm w/c = 0,58


371.0000
kg Portland Cemen ( PC )
698.0000
kg Pasir beton
1,047.0000
kg Kerikil (maksimum 30 mm)
215.0000
ltr air
1.6500
oh Pekerja
0.2500
oh Tukang batu
0.0250
oh Kepala tukang
0.0800
oh Mandor

03-7394-2008

6.9

1 M3 Beton mutu fc = 24 Mpa ( K275) slum (122) cm w/c = 0,53


406.0000
kg Portland Cemen ( PC )
684.0000
kg Pasir beton
1,026.0000
kg Kerikil (maksimum 30 mm)
215.0000
ltr air
1.6500
oh Pekerja
0.2500
oh Tukang batu
0.0250
oh Kepala tukang
0.0800
oh Mandor

03-7394-2008

6.9

1 M3 Beton mutu fc = 26.4 Mpa ( K300) slum (122) cm w/c = 0,52


413.0000
kg Portland Cemen ( PC )
681.0000
kg Pasir beton
1,021.0000
kg Kerikil (maksimum 30 mm)
215.0000
ltr air
1.6500
oh Pekerja
0.2750
oh Tukang batu
0.0280
oh Kepala tukang
0.0830
oh Mandor

03-7394-2008

6.17

10 kg Pembesian dengan besi polos / ulir


10.5000
kg Besi polos / ulir
0.1500
kg Kawat beton
0.0700
oh Pekerja
0.0700
oh Tukang batu
0.0070
oh Kepala tukang
0.0040
oh Mandor

03-7394-2008

6.21

03-7394-2008

6.22

1 M2 Memasang Bekisting untuk kolom


0.0400 m3 Kayu kelas III (terentang)
0.4000
kg Paku biasa 2"-5"
0.2000
ltr Minyak bekisting
0.0150 m3 Balok kayu kelas II
0.3500
lbr Multiplex 6 mm
2.0000 btg Dolken kayu dia 8-10 cm / 4 m
0.6600
oh Pekerja
0.3300
oh Tukang batu
0.0330
oh Kepala tukang
0.0330
oh Mandor

03-7394-2008

6.23

1 M2 Memasang Bekisting untuk balok

1 kg Pembesian dengan besi polos / ulir


1 M2 Memasang Bekisting untuk sloof
0.0450 m3 Kayu kelas III (terentang)
0.3000
kg Paku biasa 2"-5"
0.1000
ltr Minyak bekisting
0.5200
oh Pekerja
0.2600
oh Tukang batu
0.0260
oh Kepala tukang
0.0260
oh Mandor

0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330

m3
kg
ltr
m3
lbr
btg
oh
oh
oh
oh

Kayu kelas III (terentang)


Paku biasa 2"-5"
Minyak bekisting
Balok kayu kelas II
Multiplex 6 mm
Dolken kayu dia 8-10 cm / 4 m
Pekerja
Tukang batu
Kepala tukang
Mandor

10

03-7394-2008

6.24

1 M2 Memasang Bekisting untuk lantai


0.0400 m3 Kayu kelas III (terentang)
0.4000
kg Paku biasa 2"-5"
0.2000
ltr Minyak bekisting
0.0150 m3 Balok kayu kelas II
0.3500
lbr Multiplex 6 mm
2.0000 btg Dolken kayu dia 8-10 cm / 4 m
0.6600
oh Pekerja
0.3300
oh Tukang batu
0.0330
oh Kepala tukang
0.0330
oh Mandor

11

03-7394-2008

6.26

1 M2 Memasang Bekisting untuk tangga


0.0300 m3 Kayu kelas III (terentang)
0.4000
kg Paku biasa 2"-5"
0.1500
ltr Minyak bekisting
0.0150 m3 Balok kayu kelas II
0.3500
lbr Multiplex 6 mm
2.0000 btg Dolken kayu dia 8-10 cm / 4 m
0.6600
oh Pekerja
0.3300
oh Tukang batu
0.0330
oh Kepala tukang
0.0330
oh Mandor

12

Dihitung

1 M3 Beton bertulang praktis 15 x 15 :


1.0000 m3 Beton K 225
149.5207
kg Besi
13.3332 m2 Bekisting

13

Dihitung

1 M3 Beton bertulang sloof 15 x 20 :


1.0000 m3 Beton K 225
173.2849
kg Besi
13.3320 m2 Bekisting

14

Dihitung

1 M3 Beton bertulang sloof 15 x 25 ( Asrama ) :


1.0000 m3 Beton K 225
144.9191
kg Besi
13.3335 m2 Bekisting

15

Dihitung

1 M3 Beton bertulang sloof 20 x 40 ( Asrama ) :


1.0000 m3 Beton K 225
153.8700
kg Besi
10.0000 m2 Bekisting

16

Dihitung

1 M3 Beton bertulang sloof 20 x 30 ( Aula ) :


1.0000 m3 Beton K 225
197.3039
kg Besi
10.0002 m2 Bekisting

17

Dihitung

1 M3 Beton bertulang balok 20 x 40 B1 ( Aula ) :


1.0000 m3 Beton K 225
144.1000
kg Besi
12.5000 m2 Bekisting

18

Dihitung

1 M3 Beton bertulang balok 20 x 30 B2 ( Aula ) :


1.0000 m3 Beton K 225

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

177.6702
13.3336

kg
m2

Besi
Bekisting
Jml Total

19

Dihitung

1 M3 Beton bertulang balok 15 x 25 B3 ( Aula ) :


1.0000 m3 Beton K 225
187.2023
kg Besi
17.3336 m2 Bekisting

20

Dihitung

1 M3 Beton bertulang balok 15 x 20 B4 ( Aula ) :


1.0000 m3 Beton K 225
219.5311
kg Besi
18.3332 m2 Bekisting

21

Dihitung

1 M3 Beton bertulang balok 30 x 70 B1 (Asrama ) :


1.0000 m3 Beton K 225
153.5364
kg Besi
5.2382 m2 Bekisting

21

Dihitung

1 M3 Beton bertulang balok 25 x 50 B2 ( Asrama ) :


1.0000 m3 Beton K 225
198.1280
kg Besi
10.0000 m2 Bekisting

22

Dihitung

1 M3 Beton bertulang balok 20 x 30 B3 ( Asrama ) :


1.0000 m3 Beton K 225
184.0703
kg Besi
13.3336 m2 Bekisting

23

Dihitung

1 M3 Beton bertulang balok 15 x 25 B3


1.0000 m3 Beton K 225
153.3032
kg Besi
17.3336 m2 Bekisting

24

Dihitung

1 M3 Beton bertulang balok 15 x 25 B4 (Asrama) :


1.0000 m3 Beton K 225
156.4393
kg Besi
17.3336 m2 Bekisting

25

Dihitung

1 M3 Beton bertulang plat konsol penyangga talang t = 15 cm :


1.0000 m3 Beton K 225
21.068
kg Besi
6.667 m2 Bekisting

26

Dihitung

1 M3 Beton bertulang ring balok 15 x 25 RB1 ( Asrama / Aula ) :


1.0000 m3 Beton K 225
144.9191
kg Besi
13.3335 m2 Bekisting

27

Dihitung

1 M3 Beton bertulang ring balok 15 x 20 RB 2 ( Asrma ) :


1.0000 m3 Beton K 225
173.2849
kg Besi
13.3332 m2 Bekisting

28

Dihitung

1 M3 Beton bertulang ring balok 15 x 25 RB3 ( Aula ) :


1.0000 m3 Beton K 225
144.9191
kg Besi
13.3335 m2 Bekisting

29

Dihitung

1 M3 Beton bertulang kolom 30 x 50 K1 ( Asrama ) :


1.0000 m3 Beton K 225
149.3515
kg Besi
10.6672 m2 Bekisting

30

Dihitung

1 M3 Beton bertulang kolom 30 x 30 K2 ( Asrama ) :


1.0000 m3 Beton K 225
106.9012
kg Besi
13.3332 m2 Bekisting

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total
(Asrama) :

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total
31

Dihitung

1 M3 Beton bertulang kolom 20 x 20 ( Asrama / Aula ) :


1.0000 m3 Beton K 225
135.8600
kg Besi
20.0000 m2 Bekisting

32

Dihitung

1 M3 Beton bertulang kolom atas talang 15 x 30 ( Asrama ) :


1.0000 m3 Beton K 225
126.0032
kg Besi
19.9998 m2 Bekisting

33

Dihitung

1 M3 Beton bertulang kolom 15 x 50 ( Asrama ) :


1.0000 m3 Beton K 225
79.2687
kg Besi
17.3329 m2 Bekisting

Jml Total

Jml Total

Jml Total
33

Dihitung

1 M3 Beton bertulang kolom 30 x 70 K1 ( Aula ) :


1.0000 m3 Beton K 225
169.9082
kg Besi
9.5240 m2 Bekisting

34

Dihitung

1 M3 Beton bertulang kolom 30 x 30 K2 ( Aula ) :


1.0000 m3 Beton K 225
157.8651
kg Besi
13.3332 m2 Bekisting

35

Dihitung

1 M3 Beton bertulang balok tangga 15 x 25 ( Asrama ) :


1.0000 m3 Beton K 225
192.2264
kg Besi
17.3336 m2 Bekisting

36

Dihitung

1 M3 Beton bertulang kolom 15 x 20 (Pos jaga ) :


1.0000 m3 Beton K 225
169.3550
kg Besi
23.3331 m2 Bekisting

37

Dihitung

1 M3 Beton bertulang kuda-kuda 15 x 25 B3 ( Mushola ) :


1.0000 m3 Beton K 225
187.2023
kg Besi
17.3336 m2 Bekisting

38

Dihitung

1 M3 Beton bertulang kolom 30 x 30 (Doorlupe ) :


1.0000 m3 Beton K 225
70.8615
kg Besi
13.3332 m2 Bekisting

39

Dihitung

1 M3 Beton bertulang pedestal 30x40 ( Aula ) :


1.0000 m3 Beton K 225
52.4896
kg Besi
5.8331 m2 Bekisting

40

Dihitung

1 M3 Beton bertulang pedestal 25x30 ( Asrama ) :


1.0000 m3 Beton K 225
76.1248
kg Besi
7.3332 m2 Bekisting

41

Dihitung

1 Bh Pondasi foot plat 175x175 F1 ( Asrama ) :


4.5938 m3 Galian tanah
1.8375 m3 Urugan kembali
0.3063 m3 Urugan pasir
0.1531 m3 Beton K 100
0.7656 m3 Beton K 225
81.7020
kg Besi
1.4000 m2 Bekisting

42

Dihitung

1 Bh Pondasi foot plat 100x100 F2 ( Asrama ) :

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

1.0000
0.4000
0.1000
0.0500
0.2500
32.7972
0.8000

m3
m3
m3
m3
m3
kg
m2

Galian tanah
Urugan kembali
Urugan pasir
Beton K 100
Beton K 225
Besi
Bekisting
Jml Total

43

Dihitung

1 Bh Pondasi foot plat 80x80 F2 ( Asrama ) :


0.6400 m3 Galian tanah
0.2560 m3 Urugan kembali
0.0640 m3 Urugan pasir
0.0320 m3 Beton K 100
0.1600 m3 Beton K 225
21.5100
kg Besi
0.6400 m2 Bekisting

44

Dihitung

1 Bh Pondasi foot plat 120x120 F1 ( Aula ) :


1.5840 m3 Galian tanah
0.6336 m3 Urugan kembali
0.0720 m3 Urugan pasir
0.0720 m3 Beton K 100
0.3600 m3 Beton K 225
50.2048
kg Besi
0.9600 m2 Bekisting

45

Dihitung

1 Bh Pondasi foot plat tangga 60x150 F3 ( Asrama ) :


0.9750 m3 Galian tanah
0.3900 m3 Urugan kembali
0.0488 m3 Urugan pasir
0.0488 m3 Beton K 100
0.2438 m3 Beton K 225
26.1280
kg Besi
0.8600 m2 Bekisting

46

Dihitung

1 M3 Beton bertulang plat T = 10 cm


1.0000 m3 Beton K 225
62.000
kg Besi
10.000 m2 Bekisting

47

Dihitung

1 M3 Beton bertulang plat lantai T = 12 cm


1.0000 m3 Beton K 225
92.996
kg Besi
8.333 m2 Bekisting

48

Dihitung

1 M3 Beton bertulang plat tangga T = 12 cm


1.000 m3 Beton K 225
189.137
kg Besi
8.333 m2 Bekisting

49

Dihitung

1 M3 Beton bertulang plat T = 8 cm


1.0000 m3 Beton K 225
49.1250
kg Besi
12.500 m2 Bekisting

50

Dihitung

1 M3 Beton bertulang plat T = 6 cm


1.0000 m3 Beton K 225
65.2380
kg Besi
16.667 m2 Bekisting

51

Dihitung

1 Bh Beton bertulang poor mini pail 60x120 t= 40 cm (Aula)


0.288 m3 Beton K 300
48.980
kg Besi
1.440 m2 Bekisting

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total

Jml Total
F.
1

PEKERJAAN KAYU ATAP


03-3434-2008
6.15

1 M3 Memasang konstruksi gording kayu kelas II

1.1000
15.0000
3.0000
2.4000
7.2000
0.7200
0.1200

m3
kg
kg
oh
oh
oh
oh

Kayu kruing balok


Besi strip
Paku biasa 2"-5"
Pekerja
Tukang kayu
Kepala tukang
Mandor

03-3434-2008

6,15a

1 M3 Memasang konstruksi nok / jurai kayu kelas II


1.1000 m3 Kayu kruing balok
15.0000
kg Besi strip
3.0000
kg Paku biasa 2"-5"
2.4000
oh Pekerja
7.2000
oh Tukang kayu
0.7200
oh Kepala tukang
0.1200
oh Mandor

03-3434-2008

6.16

1 M2 Memasang rangka atap genteng glazur, kayu kelas II


0.0140 m3 Kayu kelas II kruing (5x7) cm
0.0080 m3 Reng bengkirai (3x5) cm
0.2500
kg Paku biasa 2"-5"
0.1000
oh Pekerja
0.1000
oh Tukang kayu
0.0100
oh Kepala tukang
0.0050
oh Mandor

03-3434-2008

6.22

1 M' Memasang listplank Uk ( 3x30 ) cm kayu kelas II


0.0110 m3 Kayu kelas II bengkirai papan
0.0500
kg Paku biasa 2"-5"
0.1000
oh Pekerja
0.2000
oh Tukang kayu
0.0200
oh Kepala tukang
0.0050
oh Mandor

3434-2008

G.
1

1 M' Memasang reiter kayu kruing ( 2x20 ) cm


0.004 m3 Kayu kruing
kg Paku biasa 2"-5"
0.040
oh Pekerja
0.175
oh Tukang kayu
0.175
oh Kepala tukang
0.010
0.004
oh Mandor

PEKERJAAN PENUTUP ATAP


03-3436-2002
6.3
1 M2 Pasang atap genteng glazur
18.0000
bh Genteng glazur
0.1500
oh Pekerja
0.0600
oh Tukang kayu
0.0060
oh Kepala tukang
0.0080
oh Mandor

03-3436-2002

6.5

1 M' Pasang bubungan genteng glazur


4.0000
bh Bubungan genteng glazur
8.0000
kg Portland Cemen ( PC )
0.0320 m3 Pasir pasang
0.4000
oh Pekerja
0.2000
oh Tukang kayu
0.0200
oh Kepala tukang
0.0020
oh Mandor

03-3436-2002

6.42

1 M2 Pasang alluminium foil / sisalation


1.0500 m2 Alluminium foil
0.1500
oh Pekerja
0.0500
oh Tukang kayu
0.0050
oh Kepala tukang
0.1200
oh Mandor

03-7393-2008

6.18

1 M' Pasang talang jurai seng BJLS 28 lebat 90 cm

1.0500
0.0150
0.0190
0.2000
0.4000
0.0250
0.0100
H.
1

03-2839-2008

6.7

Hitung

03-2839-2008

6.9

I.
1

PEKERJAAN KAYU KUSEN


03-3434-2008
6.8

J.
1

PEKERJAAN BESI
03-7393-2008
6.2

Seng plat
Paku biasa 1"-2,5"
Papan kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor

PEKERJAAN LANGIT-LANGIT
03-2839-2008
6.7
1 M2 Plafond gypsum board (120x240) tebal 9 mm:
lbr Gypsum Board 9 mm
0.3640
1.0250 btg Rangka hollow 2x4 cm t = 0,35 mm
bh Stifenner
3.0000
kg Paku keling/sekrup
0.1100
bh Penggantung dan Ramzet
4.0000
0.1000
oh Pekerja
0.0500
oh Tukang kayu
0.0050
oh Kepala tukang
0.0050
oh Mandor

lbr
kg
m3
oh
oh
oh
oh

03-7393-2008

6.2

1 M2 Plafond kalsiboard (120x240) tebal 4 mm:


lbr Kalsiboar 4 mm
0.3640
1.0250 btg Rangka hollow 2x4 cm
bh Stifenner
3.0000
kg Paku keling/sekrup
0.1100
bh Penggantung dan Ramzet
4.0000
0.1000
oh Pekerja
0.0500
oh Tukang kayu
0.0050
oh Kepala tukang
0.0050
oh Mandor
1 M2 Kompon plat
0.0784 zak
0.1500
lbr
0.1600
oh
0.0800
oh
0.0080
oh
0.0080
oh

Semen gypsum
Amplas
Pekerja
Tukang batu
Kepala tukang
Mandor

1m' Pasang list plafond gypsum


m' m' List Profil Gypsum
1.0000
kg kg Compon
0.6500
1.0000
ls Upah

1 M2 Daun pintu dobel teakwood 9mm lapis HPL rangka ky bengkirai :


0.0250 m3 Kayu bengkirai
0.0300
kg kg paku
0.5000
kg Lem kayu
2.0000 m2 HPL
2.0000 m2 Teakwood 9 mm
0.6000
oh Pekerja
2.0000
oh Tukang kayu
0.2000
oh Kepala tukang
0.0400
oh Mandor

1 Kg Pasang rangka kuda-kuda baja IWF :


1.1500
kg Besi IWF
0.0600
oh Pekerja
0.0600
oh Tukang besi
0.0060
oh Kepala tukang
0.0030
oh Mandor
1 m2 Pasang mainan listplank hollow 4x4 ( Aula ) :
9.1000
m' pipa hollow kotak 4x4 t = 2 mm
12.0000
tk las

0.0300
0.0300
0.0030
0.0015
K.
1

oh
oh
oh
oh

Pekerja
Tukang besi
Kepala tukang
Mandor

PEKERJAAN KUSEN ALLUMINIUM


03-7393-2008
6.11
1 Unit Kusen alumunium Type J1 ( Asrama )
125.880
m' Rangka kusen alumunium 4" (brown)
64.200
m' Frame daun jendela / BV
131.640 m' Tube sealant
65.820 m' Silicon gel
180.000 bh Sekrup fixer
1.000 unit Upah

03-7393-2008

6.11

1 Unit Kusen alluminium Type J2 ( Asrama )


83.920 m' Rangka kusen alumunium 4" (brown)
42.800 m' Frame daun bv
87.760 m' Tube sealant
43.880 m' Silicon gel
120.000 bh Sekrup fixer
1.000 unit Upah

03-7393-2008

6.11

1 Unit Kusen alluminium Type J3 ( Asrama )


Rangka kusen alumunium 4" (brown)
48.320 m'
Frame daun jendela
25.120 m'
Frame daun bv
17.120 m'
37.120 m'
Tube sealant
18.560 m'
Silicon gel
112.000 bh
Sekrup fixer
1.000 unit Upah

03-7393-2008

6.11

1 Unit Kusen alluminium Type J4 ( Asrama )


12.480

m'

Rangka kusen alumunium 4" (brown)

6.480

m'

Frame daun jendela

4.480

m'

Frame daun bv

9.680

m'

Tube sealant

4.840
28.000

m'

Silicon gel

bh

Sekrup fixer

1.000
5

03-7393-2008

6.11

unit Upah

1 Unit Kusen alluminium Type J5 tampak depan ( Asrama )


79.400

m'

Rangka kusen allumunium 4" (brown)

184.600

m'

Tube sealant

92.300
76.000

m'

Silicon gel

bh

Sekrup fixer

1.000

unit Upah

03-7393-2008

6.11

1 Unit Kusen alluminium Type BV ( Asrama )


4.080 m' Rangka kusen allumunium 4" (brown)
4.000 m' Frame daun bv
4.280 m' Tube sealant
2.140 m' Silicon gel
12.000 bh Sekrup fixer
1.000 unit Upah

03-7393-2008

6.11

1 Unit Kusen alluminium Type P2 ( Asrama )


10.600 m' Rangka kusen alumunium 4" (brown)
12.800 m' Rangka daun pintu
4.800 m' Frame daun jendela / bv
15.920 m' Tube sealant
7.960 m' Silicon gel
21.000 bh Sekrup fixer
1.000 unit Upah

03-7393-2008

6.11

1 Unit Kusen alluminium Type P3 ( Asrama )

8.270
2.540
2.240
1.120
14.000
1.000

m'
m'
m'
m'
bh
unit

Rangka kusen alumunium 4" (brown)


Rangka daun bv
Tube sealant
Silicon gel
Sekrup fixer
Upah

03-7393-2008

6.11

1 Unit Kusen alluminium Type PJ1 ( Aula )


21.200 m' Rangka kusen alumunium 4" (brown)
11.600 m' Rangka daun pintu
9.520 m' Rangka daun juendela / bv
48.880 m' Tube sealant
24.440 m' Silicon gel
36.000 bh Sekrup fixer
1.000 unit Upah

10

03-7393-2008

6.11

1 Unit Kusen alluminium Type PJ2 ( Aula )


17.250 m' Rangka kusen alumunium 4" (brown)
14.200 m' Rangka daun juendela / bv
22.200 m' Tube sealant
11.100 m' Silicon gel
33.000 bh Sekrup fixer
1.000 unit Upah

11

03-7393-2008

6.11

1 Unit Kusen alluminium Type PBV ( Aula )


13.300 m' Rangka kusen alumunium 4" (brown)
7.000 m' Rangka daun juendela / bv
10.360 m' Tube sealant
5.180 m' Silicon gel
22.000 bh Sekrup fixer
1.000 unit Upah

12

03-7393-2008

6.11

1 Unit Kusen alluminium Type J1 ( Aula )


11.140 m' Rangka kusen alumunium 4" (brown)
11.600 m' Rangka daun juendela / bv
18.240 m' Tube sealant
9.120 m' Silicon gel
24.000 bh Sekrup fixer
1.000 unit Upah

13

03-7393-2008

6.11

1 Unit Kusen alluminium Type BV ( Aula )


4.520 m' Rangka kusen alumunium 4" (brown)
4.400 m' Rangka daun juendela / bv
6.320 m' Tube sealant
3.160 m' Silicon gel
8.000 bh Sekrup fixer
1.000 unit Upah

14

03-7393-2008

6.11

1 Unit Kusen alluminium Type P2 ( Aula )


11.190 m' Rangka kusen allumunium 4" (brown)
11.000 m' Rangka daun pintu
29.800 m' Tube sealant
14.900 m' Silicon gel
26.000 bh Sekrup fixer
1.000 unit Upah

15

03-7393-2008

6.11

1 Unit Kusen alluminium Type P3 ( Aula )


11.200 m' Rangka kusen allumunium 4" (brown)
5.120 m' Rangka daun juendela / bv
8.080 m' Tube sealant
4.040 m' Silicon gel
19.000 bh Sekrup fixer
1.000 unit Upah

16

03-7393-2008

6.11

1 Unit Kusen alluminium Type P4 ( Aula )


7.900 m' Rangka kusen allumunium 4" (brown)
2.400 m' Rangka daun juendela / bv

3.720
1.860
16.000
1.000

m'
m'
bh
unit

Tube sealant
Silicon gel
Sekrup fixer
Upah

17

03-7393-2008

6.11

1 Unit Kusen alluminium Type BV atas ( Aula )


3.600 m' Rangka kusen allumunium 4" (brown)
0.600 m2 Kaca talip bening 5 mm
3.200 m' Tube sealant
1.600 m' Silicon gel
12.000 bh Sekrup fixer
1.000 unit Upah

18

03-7393-2008

6.11

1 Unit Kusen alluminium Type P1 ( mushola )


6.110 m' Rangka kusen allumunium 4" (brown)
13.860 m' Rangka daun pintu aluminium brown
21.360 m' Tube sealant
10.680 m' Silicon gel
12.000 bh Sekrup fixer
1.000 unit Upah

19

03-7393-2008

6.11

1 Unit Kusen alluminium Type J1 ( mushola )


11.450 m' Rangka kusen allumunium 4" (brown)
7.920 m' Rangka daun juendela aluminium brown
24.480 m' Tube sealant
12.240 m' Silicon gel
16.000 bh Sekrup fixer
1.000 unit Upah

20

03-7393-2008

6.11

1 Unit Kusen alluminium Type J2 ( mushola )


10.160 m' Rangka kusen allumunium 4" (brown)
12.930 m' Rangka daun juendela aluminium brown
26.216 m' Tube sealant
13.108 m' Silicon gel
18.000 bh Sekrup fixer
1.000 unit Upah

21

03-7393-2008

6.11

1 Unit Kusen alluminium Type BV ( mushola )


2.680 m' Rangka kusen allumunium 4" (brown)
2.200 m' Rangka daun juendela aluminium brown
2.800 m' Tube sealant
1.400 m' Silicon gel
8.000 bh Sekrup fixer
1.000 unit Upah

22

03-7393-2008

6.11

1 Unit Kusen alluminium Type P1 ( pos jaga )


5.220 m' Rangka kusen allumunium 4" (brown)
6.580 m' Rangka daun pintu aluminium brown
11.600 m' Tube sealant
5.800 m' Silicon gel
10.000 bh Sekrup fixer
1.000 unit Upah

23

03-7393-2008

6.11

1 Unit Kusen alluminium Type J1 ( pos jaga )


20.500 m' Rangka kusen allumunium 4" (brown)
27.700 m' Tube sealant
13.850 m' Silicon gel
26.000 bh Sekrup fixer
1.000 unit Upah

L.
1

PEKERJAAN CAT
03-24

03-24

6.1

1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama :


0.0500
kg Soda api
0.1500
oh Pekerja
0.0025
oh Mandor

6.8

1 M2 Pengecatan kayu baru ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup :

0.2000
0.1500
0.1700
0.2600
0.0700
0.0090
0.0060
0.0025

kg
kg
kg
kg
oh
oh
oh
oh

Cat meni
Plamur
Cat dasar
Cat penutup 2 kali
Pekerja
Tukang cat
Kepala tukang
Mandor

03-24

6.14

1 M2 Pengecatan tembok baru ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup :
0.1000
kg Plamur
0.1000
kg Cat dasar
0.2600
kg Cat penutup 2 kali
0.2600
lbr Amplas
0.0200
oh Pekerja
0.0630
oh Tukang cat
0.0063
oh Kepala tukang
0.0025
oh Mandor

03-24

6.15

1 M2 Pengecatan tembok lama ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup :
0.1000
kg Cat dasar
0.1800
kg Cat penutup 2 kali
0.2600
lbr Amplas
0.0280
oh Pekerja
0.0420
oh Tukang cat
0.0042
oh Kepala tukang
0.0025
oh Mandor

M.
1

N.
1

PEKERJAAN KACA
6.17

6,17a

PEKERJAAN SANITASI
6.25

6.25

1 M2 Memasang kaca bening 5 mm :


1.1000 m2 Kaca bening 5 mm
0.0150
oh Pekerja
0.1500
oh Tukang
0.0150
oh Kepala tukang
0.0008
oh Mandor
1 M2 Memasang kaca bening 12 mm :
1.1000 m2 Kaca bening 12 mm
0.0150
oh Pekerja
0.1500
oh Tukang
0.0150
oh Kepala tukang
0.0008
oh Mandor

1 M' Pasang pipa GIP 1 1/2" :


1.2000
m' Pipa GIP 1 1/2"
0.3500
ls Perlengkapan 35 % harga pipa
0.1080
oh Pekerja
0.1800
oh Tukang
0.0180
oh Kepala tukang
0.0540
oh Mandor
1 M' Pasang pipa PVC AW 1/2" :
1.2000
m' Pipa PVC
0.3500
ls Perlengkapan 35 % harga pipa
0.0360
oh Pekerja
0.0600
oh Tukang
0.0060
oh Kepala tukang
0.0018
oh Mandor
1 M' Pasang pipa PVC 3/4" :
1.2000
m' Pipa PVC
0.3500
ls Perlengkapan 35 % harga pipa
0.0360
oh Pekerja
0.0600
oh Tukang
0.0060
oh Kepala tukang
0.0018
oh Mandor

1 M' Pasang pipa PVC 1" :


1.2000
m' Pipa PVC
0.3500
ls Perlengkapan 35 % harga pipa
0.0360
oh Pekerja
0.0600
oh Tukang
0.0060
oh Kepala tukang
0.0018
oh Mandor

1 M' Pasang pipa PVC 1 1/2" :


1.2000
m' Pipa PVC
0.3500
ls Perlengkapan 35 % harga pipa
0.0360
oh Pekerja
0.0600
oh Tukang
0.0060
oh Kepala tukang
0.0018
oh Mandor

6.29

1 M' Pasang pipa PVC 2" :


1.2000
m' Pipa PVC
0.3500
ls Perlengkapan 35 % harga pipa
0.0540
oh Pekerja
0.0900
oh Tukang
0.0090
oh Kepala tukang
0.0027
oh Mandor

6.31

1 M' Pasang pipa PVC 3" :


1.2000
m' Pipa PVC
0.3500
ls Perlengkapan 35 % harga pipa
0.0810
oh Pekerja
0.1350
oh Tukang
0.0140
oh Kepala tukang
0.0041
oh Mandor
1 M' Pasang pipa PVC 4" :
1.2000
m' Pipa PVC
0.3500
ls Perlengkapan 35 % harga pipa
0.0810
oh Pekerja
0.1350
oh Tukang
0.0140
oh Kepala tukang
0.0041
oh Mandor

6.1

1 Bh Memasang Klosed duduk monoblok ( TOTO ) :


1.0000
bh Klosed duduk
0.0600
ls Perlengkapan 6 % harga pipa
3.3000
oh Pekerja
1.1000
oh Tukang
0.0010
oh Kepala tukang
0.1600
oh Mandor

10

6.5

1 Bh Memasang Wastafel :
1.0000
bh Wastafel meja oval
0.3000
ls Perlengkapan 30 % harga pipa
6.0000
kg Portland cement
0.0100 m3 Pasir pasang
1.2000
oh Pekerja
0.1450
oh Tukang
0.1500
oh Kepala tukang
0.1000
oh Mandor

11

6.5

1 Bh Memasang Shower lengkap :


1.0000
bh Shower
0.3000
ls Perlengkapan 30 % harga pipa
6.0000
kg Portland cement
0.0100 m3 Pasir pasang
1.2000
oh Pekerja
0.1450
oh Tukang
0.1500
oh Kepala tukang

0.1000

oh

Mandor

12

6.36

1 Bh Memasang Floor Drain


1.0000
bh Floor Drain
0.0100
oh Pekerja
0.1000
oh Tukang
0.0100
oh Kepala tukang
0.0050
oh Mandor

13

6.35

1 Bh Memasang Kran dia 3/4" dan 1/2"


1.0000
bh Kran air
1.0000
set Seal tape
0.0100
oh Pekerja
0.1000
oh Tukang
0.0100
oh Kepala tukang
0.0050
oh Mandor

14

1 M2 Pasang paving blok Holland t = 6 cm : K 300


45.0000
bh paving holland t = 6 cm
0.0800 m3 Pasir pasang
0.4000
oh pekerja
0.2000
oh tukang batu
0.0200
oh kepala tukang
0.0200
oh mandor

15

1 M' Pasang kansteen beton


2.0000
bh kansteen 10x20x50
0.0500 m3 Pasir pasang
0.1000
oh pekerja
0.0500
oh kepala tukang
0.0100
oh mandor

16

1 M' Saluran U 30 :
0.4000 m2
0.2400 m2
0.0100 m3
0.0400 m3
1.0000
m'

17

18

pas. batu bata 1:5


plesteran 1:5
pasir urug
galian tanah
buis beton U 30

1 BH Bak kontrol U 30 :
0.3600 m2 m2
0.0100 m3 m3
0.0045 m3 m3
0.5040 m3 m2
0.0429 m3 m3
1 M' Saluran O 30 :
0.4000 m2
0.0100 m3
0.0400 m3
1.0000
m'

pas.batu bata 1:5


pas. koral
pasir urug
plester 1:5
galian tanah

pas. batu bata 1:5


pasir urug
galian tanah
buis beton 0 30

19

1 M' Pasang grill penutup saluran


10.3675
kg besi siku 50.50.5
6.3200
kg besi dia 16 mm
15.0000
ttk las
0.4000
oh pekerja
0.2000
oh tukang
0.0200
oh kepala tukang
0.0200
oh mandor

20

1 M2 Pasang atap Pollycarbonate datar


1.2000 m2 m2 pollycarbonat datar
0.4700
kg kg angkur baut
oh tukang
0.2300
oh kepala tukang
0.0230
0.0230
oh mandor

21

1 Unit Memasang rangka atap doorloop rangka pipa hitam


11.6 m' kuda-kuda pipa hitam 2"
75.0000
m' gording pipa hitam 1"
15.3600
kg plat landas 6 mm
14.9760
kg angkur baut 16 mm
1.0000
ls las
0.0520
oh mandor
0.1050
oh kep tukang besi
1.0500
oh tukang besi
oh pekerja
1.0500

22

1 Unit Memasang resapan dari bis beton + penutup


1.500
m' galian tanah
1.0000
bh Bis beton 80 cm
0.0500
1.0000

m3
bh

Penutup dari plat beton t = 5 cm


besi pengan tutup