Anda di halaman 1dari 1231

DAFTAR ANALISA SATUAN PEKERJAAN

PEMERINTAH KABUPATEN BANYUWANGI


TAHUN 2017

I. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN


6.1 1 m' Pagar sementara dari kayu tinggi 2 meter
6.1,1 Bahan
1.250 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
5.000 kg Semen PC @ Rp. 1,370.00
0.005 m3 Pasir beton @ Rp. 200,000.00
0.009 m3 Batu Krikil @ Rp. 141,750.00
0.072 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.060 kg Paku usuk 4" @ Rp. 14,000.00
6.1,2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.020 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
L.02 1 m' Pemagaran daerah kerja tiang kayu
Bahan
1.200 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
0.035 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.300 kg Paku seng @ Rp. 23,450.00
0.120 kg Paku usuk 4" @ Rp. 14,000.00
0.100 m3 Pasir pasang @ Rp. 185,000.00
12.000 kg Semen PC @ Rp. 1,370.00
Tenaga Jumlah (I)
0.180 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
L.02 1 m' Pemagaran daerah kerja tiang besi siku
Bahan
1.200 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
10.000 kg Besi siku @ Rp. 12,700.00
0.050 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
0.100 m3 Pasir pasang @ Rp. 185,000.00
12.000 kg Semen PC @ Rp. 1,370.00
Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Besi @ Rp. 75,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 1 m' Pagar sementara dari seng gelombang tinggi 2 meter
6,2,1 Bahan
1.250 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
2.500 kg Semen PC @ Rp. 1,370.00
1.200 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
0.005 m3 Pasir beton @ Rp. 200,000.00
0.009 m3 Batu Krikil @ Rp. 141,750.00
0.072 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.060 kg Paku usuk 4" @ Rp. 14,000.00
0.450 kg Cat menie (besi/kayu) sejenis cap Pedang @ Rp. 38,180.00
6,2,2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.020 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 1 m' Pagar sementara dari kawat duri tinggi 1,8 meter
6,3,1 Bahan
1.000 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
2.000 kg Semen PC @ Rp. 1,370.00
25 kg 25.000 m' Kawat berduri @ Rp. 1,850.00
0.005 m3 Pasir beton @ Rp. 200,000.00
0.009 m3 Batu Krikil @ Rp. 141,750.00
0.060 kg Paku usuk 4" @ Rp. 14,000.00
6,3,2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.020 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 1 m' Pengukuran dan Pemasangan bouwplank
6.4.1 Bahan
0.012 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.020 kg Paku usuk 4" @ Rp. 14,000.00
2/20 0.007 m3 Kayu lokal papan 2/20 x 4 m @ Rp. 4,945,000.00
6.4.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 m2 Pembuatan kantor sementara, dengan lantai plesteran
6,5,1 Bahan
1.250 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
0.180 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.080 kg Paku usuk 4" @ Rp. 14,000.00
1.100 kg Besi strip 2 cm @ Rp. 20,450.00
35.000 kg Semen PC @ Rp. 1,370.00
0.150 m3 Pasir pasang @ Rp. 185,000.00
0.100 m3 Pasir beton @ Rp. 200,000.00
0.150 m3 Batu Krikil @ Rp. 141,750.00
30.000 bh Batu bata merah @ Rp. 750.00
0.250 lbr Seng BJLs 28/ 0,9 x 1,8 @ Rp. 83,375.00
0.200 bh Kaca naco @ Rp. 7,550.00
0.080 m2 Kaca polos tebal 5 mm @ Rp. 86,050.00
0.150 bh Kunci tanam (808) @ Rp. 51,000.00
0.060 lmb Plywood tebal 4 mm @ Rp. 77,625.00
6,5,1 Tenaga Jumlah (I)
2.000 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
1.000 OH Tukang Batu @ Rp. 70,000.00
0.300 OH Kepala Tukang Batu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 1 m2 Pembuatan gudang semen dan alat - alat
6,6,1 Bahan
1.700 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
0.210 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
10.500 kg Semen PC @ Rp. 1,370.00
0.030 m3 Pasir beton @ Rp. 200,000.00
0.050 m3 Batu Krikil @ Rp. 141,750.00
1.500 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
0.250 lbr Seng BJLs 28/ 0,9 x 1,8 @ Rp. 83,375.00
6,6,2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 1 m2 Pembuatan rumah jaga / konstruksi kayu
6,7,1 Bahan
3.000 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
0.276 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.700 kg Paku usuk 4" @ Rp. 14,000.00
1,5 lbr 1.500 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
6,7,2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
1.500 OH Tukang Kayu @ Rp. 90,000.00
0.150 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
L.03 1 m2 Pembuatan direksi keet, los kerja dan gudang
6,6,1 Bahan
0.050 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.600 lbr Plywood tebal 4 mm @ Rp. 77,625.00
26.000 kg Semen PC @ Rp. 1,370.00
0.100 m3 Pasir pasang @ Rp. 185,000.00
1.000 lbr Asbes datar tebal 4 mm (60 x 200) @ Rp. 39,750.00
0.750 kg Paku usuk 4" @ Rp. 14,000.00
0.300 lbr Asbes gelombang besar tebal 5 mm @ Rp. 126,500.00
9.000 bh Paku asbes @ Rp. 500.00
0.700 m2 Flor lantai 1 : 3 : 5 @ Rp. 30,452.00
0.060 m2 Pintu double teakwood rangka kayu @ Rp. 632,900.00
1.000 daun Kaca naco @ Rp. 7,550.00
1.000 m2 Cat dinding / plafon @ Rp. 27,710.00
6,6,2 Tenaga Jumlah (I)
1.200 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Batu @ Rp. 70,000.00
0.040 OH Kepala Tukang Batu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 1 m2 Pembersihan lapangan dan perataan
6.8.1 Tenaga
0.100 OH Pekerja @ Rp. 60,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 1 m2 Pembuatan bedeng pekerja
6,9,1 Bahan
1.250 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
0.186 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
18.000 kg Semen PC @ Rp. 1,370.00
0.030 m3 Pasir beton @ Rp. 200,000.00
0.050 m3 Batu Krikil @ Rp. 141,750.00
1.500 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
1.350 lbr Plywood tebal 4 mm @ Rp. 77,625.00
6,9,2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm
6,10,1 Bahan
0.036 m3 Acuan Kayu Begisting @ Rp. 3,090,150.00
0.080 kg Paku usuk 4" @ Rp. 14,000.00
0.014 btg Kayu lokal usuk 5/7 x 200/250 @ Rp. 42,262.50
6,10,2 Tenaga Jumlah (I)
0.300 OH Tukang Kayu @ Rp. 90,000.00
mandor 0.030 OH Kepala tukang kayu @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 1 m2 Pembuatan stegger/ perancah dari bambu, ukuran ( 40 x 50 x 25 ) cm
6,11,1 Bahan
1.250 btg Trucuk/bambu (3 m) @ Rp. 14,375.00
0.186 kg Ijuk @ Rp. 19,800.00
6,11,2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.I3 1 m3 Bongkaran beton bertulang
6.I3.1 Tenaga
6.667 13.334 OH Pekerja @ Rp. 60,000.00
0.333 0.666 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.I4 1 m3 Bongkaran dinding tembok bata
6.I4.1 Tenaga
6.667 OH Pekerja @ Rp. 60,000.00
0.033 0.333 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
B.40 1m3 Bongkar beton dengan Jack Hammer
6.I3.1 Bahan
0.600 2.50 L Pertamax @ Rp. 8,050.00
Peralatan Jumlah (I)
0.250 sewa/hr Sewa Jack Hammer @ Rp. 196,318.00
0.030 Tenaga Jumlah (II)
1.200 OH Pekerja @ Rp. 60,000.00
0.120 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan

II. ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH


6.1 Menggali 1 m3 tanah biasa sedalam 1 meter
6.1.1 Tenaga
0.750 OH Pekerja @ Rp. 60,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Menggali 1 m3 tanah biasa sedalam 2 meter
6.2.1 Tenaga
0.900 OH Pekerja @ Rp. 60,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Menggali 1 m3 tanah biasa sedalam 3 meter
6.3.1 Tenaga
1.050 OH Pekerja @ Rp. 60,000.00
0.067 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Menggali 1 m3 tanah keras sedalam 1 meter
6.4.1 Tenaga
1.000 OH Pekerja @ Rp. 60,000.00
0.032 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Menggali 1 m3 tanah cadas sedalam 1 meter
6.5.1 Tenaga
1.500 OH Pekerja @ Rp. 60,000.00
0.060 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 Menggali 1 m3 tanah lumpur sedalam 1 meter
6.6.1 Tenaga
1.200 OH Pekerja @ Rp. 60,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 Mengerjakan 1 m2 stripping tanah tebing setinggi 1 meter
6.7.1 Tenaga
0.050 OH Pekerja @ Rp. 60,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Membuang 1 m3 tanah sejauh 30 meter
6.8.1 Tenaga
0.330 OH Pekerja @ Rp. 60,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9a Mengurug kembali 1 m3 galian tanah biasa sedalam 1 meter
6.9a.1 1/3 x galian Pekerjaan Galian @ Rp. 47,250.00
Harga setelah dibulatkan
6.9b Mengurug kembali 1 m3 galian tanah biasa sedalam 2 meter
6.9b.1 1/3 x galian Pekerjaan Galian @ Rp. 58,050.00
Harga setelah dibulatkan
6.9c Mengurug kembali 1 m3 galian tanah biasa sedalam 3 meter
6.9c.1 1/3 x galian Pekerjaan Galian @ Rp. 69,030.00
Harga setelah dibulatkan
6.9d Mengurug kembali 1 m3 galian tanah keras sedalam 1 meter
6.9d.1 1/3 x galian Pekerjaan Galian @ Rp. 62,880.00
Harga setelah dibulatkan
6.9e Mengurug kembali 1 m3 galian tanah cadas sedalam 1 meter
6.9e.1 1/3 x galian Pekerjaan Galian @ Rp. 95,400.00
Harga setelah dibulatkan
6.9f Mengurug kembali 1 m3 galian tanah lumpur sedalam 1 meter
6.9f.1 1/3 x galian Pekerjaan Galian @ Rp. 76,050.00
Harga setelah dibulatkan
6.10 Memadatkan 1 m3 tanah (per 20 cm)
6.10.1 Tenaga
0.500 OH Pekerja @ Rp. 60,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Mengurug 1 m3 pasir urug
6.11.1 Bahan
1.200 m3 Pasir urug @ Rp. 150,000.00
6.11.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 Memasang 1 m3 Lapisan pudel campuran 1 KP : 3 PP : 7 TL
6.12.1 Bahan
0.135 m3 Kapur pasang @ Rp. 409,600.00
0.400 m3 Pasir pasang @ Rp. 185,000.00
0.948 m3 Tanah liat @ Rp. 93,000.00
6.12.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Batu @ Rp. 70,000.00
0.040 OH Kepala Tukang Batu @ Rp. 90,000.00
0.080 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 Memasang 1 m3 Lapisan pudel campuran 1 KP : 5 TL
6.13.1 Bahan
0.248 m3 Kapur pasang @ Rp. 409,600.00
1.240 m3 Tanah liat @ Rp. 93,000.00
6.13.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Batu @ Rp. 70,000.00
0.040 OH Kepala Tukang Batu @ Rp. 90,000.00
0.080 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 Memasang 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan
6.14.1 Bahan
6.000 kg Ijuk @ Rp. 19,800.00
6.14.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga seteah dibulatkan
6.15 Mengurug 1 m3 sirtu padat
6.15.1 Bahan
1.200 m3 Sirtu @ Rp. 129,000.00
6.15.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Mengurug 1 m3 Tanah Urug
6.15.1 Bahan
1.200 m3 Tanah Urug @ Rp. 93,000.00
6.15.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
T.15 Timbunan tanah menggunakan buldozer
Bahan
10.800 Liter Solar @ Rp. 8,500.00
Tenaga Jumlah (I)
1.000 OJ Operator terampil @ Rp. 100,000.00
0.500 OJ Mekanik Terampil @ Rp. 110,000.00
Peralatan Jumlah (II)
1.000 Jam Sewa Buldozer @ Rp. 193,200.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
T.16 Galian tanah menggunakan excavator
Bahan
10.800 Liter Solar @ Rp. 8,500.00
Tenaga Jumlah (I)
1.000 OJ Operator terampil @ Rp. 100,000.00
0.500 OJ Mekanik Terampil @ Rp. 110,000.00
2.000 OJ Penjaga malam @ Rp. 50,000.00
Peralatan Jumlah (II)
1.000 Jam Sewa Excavator @ Rp. 276,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
T.17 Biaya operasional dump truck (mengangkut material tanah,jarak angkut 8 km/5m3)
Bahan
2.400 Liter Solar @ Rp. 8,500.00
Tenaga Jumlah (I)
1.000 OJ Sopir personil @ Rp. 105,000.00
1.000 OJ Pekerja @ Rp. 60,000.00
Peralatan Jumlah (II)
1.000 Jam Sewa Dumptruck @ Rp. 57,500.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
T.18 Biaya operasional vibro roller
Bahan
20.000 Liter Solar @ Rp. 8,500.00
Tenaga Jumlah (I)
1.000 OJ Operator terampil @ Rp. 100,000.00
0.500 OJ Mekanik Terampil @ Rp. 110,000.00
Peralatan Jumlah (II)
1.000 Jam Pemadat timbunan (Vibro Roller/stamper) @ Rp. 914.29
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan

III. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI


6.1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP
6.1.1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
202.000 kg Semen PC @ Rp. 1,370.00
0.485 m3 Pasir pasang @ Rp. 185,000.00
6.1.2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
6.2.1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
163.000 kg Semen PC @ Rp. 1,370.00
0.520 m3 Pasir pasang @ Rp. 185,000.00
6.2.2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP
6.3.1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
136.000 kg Semen PC @ Rp. 1,370.00
0.544 m3 Pasir pasang @ Rp. 185,000.00
6.3.2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP
6,4,1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
117.000 kg Semen PC @ Rp. 1,370.00
0.561 m3 Pasir pasang @ Rp. 185,000.00
6,4,2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PP
6,5,1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
91.000 kg Semen PC @ Rp. 1,370.00
0.584 m3 Pasir pasang @ Rp. 185,000.00
6,5,2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 KP : 10 PP
6.7.1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
61.000 kg Semen PC @ Rp. 1,370.00
0.147 m3 Kapur pasang @ Rp. 409,600.00
0.492 m3 Pasir pasang @ Rp. 185,000.00
6.7.2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 m3 pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP
6,8,1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
41.000 kg Semen PC @ Rp. 1,370.00
0.131 m3 Kapur pasang @ Rp. 409,600.00
0.523 m3 Pasir pasang @ Rp. 185,000.00
6,8,2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 Memasang 1 m3 batu kosong (aanstamping)
6.9.1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
0.432 m3 Pasir urug @ Rp. 150,000.00
6.9.2 Tenaga Jumlah (I)
0.780 OH Pekerja @ Rp. 60,000.00
0.390 OH Tukang Batu @ Rp. 70,000.00
0.039 OH Kepala Tukang Batu @ Rp. 90,000.00
0.039 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
6.10.1 Bahan
0.480 m3 Batu Belah 15/20 @ Rp. 120,100.00
194.000 kg Semen PC @ Rp. 1,370.00
0.312 m3 Pasir beton @ Rp. 200,000.00
0.468 m3 Batu Krikil @ Rp. 141,750.00
126.000 kg Besi beton polos @ Rp. 10,000.00
1.800 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
6.10.2 Tenaga Jumlah (I)
3.400 OH Pekerja @ Rp. 60,000.00
0.850 OH Tukang Batu @ Rp. 70,000.00
0.085 OH Kepala Tukang Batu @ Rp. 90,000.00
0.170 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm
6.11.1 Bahan
0.450 m3 Batu Belah 15/20 @ Rp. 120,100.00
194.000 kg Semen PC @ Rp. 1,370.00
0.312 m3 Pasir beton @ Rp. 200,000.00
0.468 m3 Batu Krikil @ Rp. 141,750.00
6.11.2 Tenaga Jumlah (I)
2.400 OH Pekerja @ Rp. 60,000.00
0.800 OH Tukang Batu @ Rp. 70,000.00
0.080 OH Kepala Tukang Batu @ Rp. 90,000.00
0.119 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan

IV. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON


B.01 1 m3 beton untuk lantai kerja (bedding)
Bahan
230.000 kg Semen PC @ Rp. 1,370.00
893.000 kg Pasir beton @ Rp. 142.86
1027.000 kg Batu Pecah @ Rp. 259.25
200.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.200 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.060 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1 1 m3 beton mutu f'c = 7,4 MPa ( K 100 ), slump ( 12 ± 2 ) cm, w/c = 0,87 (molen)
Bahan
247.000 kg Semen PC @ Rp. 1,370.00
869.000 kg Pasir beton @ Rp. 142.86
999.000 kg Batu Pecah @ Rp. 259.25
215.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.323 OH Pekerja @ Rp. 60,000.00
0.189 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 Hari Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 1 m3 beton mutu f'c = 9,8 MPa ( K 125 ), slump ( 12 ± 2 ) cm, w/c = 0,78 (molen)
Bahan
276.000 kg Semen PC @ Rp. 1,370.00
828.000 kg Pasir beton @ Rp. 142.86
1012.000 kg Batu Pecah @ Rp. 259.25
215.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.323 OH Pekerja @ Rp. 60,000.00
0.189 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 Hari Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 1 m3 beton mutu f'c = 12,2 MPa ( K 150 ), slump ( 12 ± 2 ) cm, w/c = 0,72 (molen)
Bahan
299.000 kg Semen PC @ Rp. 1,370.00
799.000 kg Pasir beton @ Rp. 142.86
1017.000 kg Batu Pecah @ Rp. 259.25
215.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.323 OH Pekerja @ Rp. 60,000.00
0.189 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 Hari Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 1 m3 lantai kerja beton mutu f'c = 7,4 MPa ( K 100 ), slump ( 3 - 6 ) cm, w/c = 0,87 (molen)
Bahan
230.000 kg Semen PC @ Rp. 1,370.00
893.000 kg Pasir beton @ Rp. 142.86
1027.000 kg Batu Pecah @ Rp. 259.25
200.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.200 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.060 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 Hari Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 m3 beton mutu f'c = 14,5 MPa ( K 175 ), slump ( 12 ± 2 ) cm, w/c = 0,66 (molen)
Bahan
326.000 kg Semen PC @ Rp. 1,370.00
760.000 kg Pasir beton @ Rp. 142.86
1029.000 kg Batu Pecah @ Rp. 259.25
215.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.323 OH Pekerja @ Rp. 60,000.00
0.189 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 Hari Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 m3 beton mutu f'c = 14,5 M Pa ( K 175 ), slump ( 12 ± 2 ) cm, w/c = 0,66 ready mix
Bahan
1.020 m3 Beton Ready Mix K 175 @ Rp. 925,750.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Standar @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 1 m3 beton mutu f'c = 19,3 M Pa ( K 225 ), slump ( 12 ± 2 ) cm, w/c = 0,58 (molen)
Bahan
371.000 kg Semen PC @ Rp. 1,370.00
698.000 kg Pasir beton @ Rp. 142.86
1047.000 kg Batu Pecah @ Rp. 259.25
215.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.323 OH Pekerja @ Rp. 60,000.00
0.189 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 koef Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 1 m3 beton mutu f'c = 19,3 M Pa ( K 225 ), slump ( 12 ± 2 ) cm, w/c = 0,58 ready mix
Bahan
1.020 m3 Beton Ready Mix K 225 @ Rp. 943,000.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Standar @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 1 m3 beton mutu f'c = 21,7 M Pa ( K 250 ), slump ( 12 ± 2 ) cm, w/c = 0,56 ready mix
Bahan
1.020 m3 Beton Ready Mix K 250 @ Rp. 954,500.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Standar @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 1 m3 beton mutu f'c = 24,0 M Pa ( K 275 ), slump ( 12 ± 2 ) cm, w/c = 0,53 ready mix
Bahan
1.020 m3 Beton Ready Mix K 275 @ Rp. 966,000.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Standar @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 1 m3 beton mutu f'c = 26,4 M Pa ( K 300 ), slump ( 12 ± 2 ) cm, w/c = 0,52 ready mix
Bahan
1.020 m3 Beton Ready Mix K 300 @ Rp. 977,500.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Longbow @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 1 m3 beton mutu f'c = 31,2 M Pa ( K 350 ), slump ( 12 ± 2 ) cm, w/c = 0,48 ready mix
Bahan
1.020 m3 Beton Ready Mix K 350 @ Rp. 1,023,500.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Longbow @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai
Tabel berikut :
Bahan
448.000 kg Semen PC @ Rp. 1,370.00
667.000 kg Pasir beton @ Rp. 142.86
1000.000 kg Batu Pecah @ Rp. 259.25
200.000 Liter Air @ Rp. 15.00
Tenaga Jumlah (I)
2.100 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.105 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Pembesian 10 kg dengan besi polos
Bahan
10.500 kg Besi beton polos @ Rp. 10,000.00
0.150 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Besi @ Rp. 75,000.00
0.007 OH Kepala Tukang Besi @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Pembesian 10 kg dengan besi ulir
Bahan
10.500 kg Besi beton ulir @ Rp. 10,500.00
0.150 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Besi @ Rp. 75,000.00
0.007 OH Kepala Tukang Besi @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.18 Pembesian 10 kg kabel presstressed polos
Bahan
10.500 kg Besi beton polos @ Rp. 10,000.00
0.100 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
Tenaga Jumlah (I)
0.050 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Besi @ Rp. 75,000.00
0.005 OH Kepala Tukang Besi @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.19 Memasang 1 kg jaring kawat baja / wiremesh
Bahan
1.020 kg Warmes 2.4 x 5.1 (8 mm) @ Rp. 22,404.36
0.050 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
Tenaga Jumlah (I)
0.025 OH Pekerja @ Rp. 60,000.00
0.025 OH Tukang Besi @ Rp. 75,000.00
0.020 0.025 OH Kepala Tukang Besi @ Rp. 80,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
KOEFISIEN POMPA BETON STANDAR PER JAM
1.000 unit/6jmSewa Pompa Beton Standar @ Rp. 4,312,500.00
Jasa Pompa Beton per Jam
9.960 m3 Kapasitas Beton Per Jam (AHSP)
Jasa Pompa Per M3
Jasa Pompa Per Jam dibagi koef (AHSP) 0.12
Harga setelah dibulatkan
KOEFISIEN POMPA BETON LONGBOW PER JAM
1.000 unit/6jmSewa Pompa Beton Longbow @ Rp. 5,462,500.00
Jasa Pompa Beton per Jam
9.960 m3 Kapasitas Beton Per Jam (AHSP)
Jasa Pompa Per M3
Jasa Pompa Per Jam dibagi koef (AHSP) 0.12
Harga setelah dibulatkan
6.20 Memasang 1 m2 bekisting untuk pondasi
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
Tenaga Jumlah (I)
0.520 OH Pekerja @ Rp. 60,000.00
0.260 OH Tukang Kayu @ Rp. 90,000.00
0.026 OH Kepala Tukang kayu @ Rp. 90,000.00
0.026 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.21 Memasang 1 m2 bekisting untuk sloof
Bahan
0.045 m3 Kayu kelas III @ Rp. 3,450,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
Tenaga Jumlah (I)
0.520 OH Pekerja @ Rp. 60,000.00
0.260 OH Tukang Kayu @ Rp. 90,000.00
0.026 OH Kepala Tukang kayu @ Rp. 90,000.00
0.026 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.21 Memasang 1 m2 bekisting untuk sloof 2xpakai
Bahan
0.045 m3 Kayu kelas III @ Rp. 3,450,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
Jumlah 1x pakai
Tenaga Jumlah (I) 2x pakai
0.520 OH Pekerja @ Rp. 60,000.00
0.260 OH Tukang Kayu @ Rp. 90,000.00
0.026 OH Kepala Tukang kayu @ Rp. 90,000.00
0.026 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22 Memasang 1 m2 bekisting untuk kolom
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22 Memasang 1 m2 bekisting untuk kolom (menggunakan bambu)
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22 Memasang 1 m2 bekisting untuk kolom (menggunakan bambu) 2x pakai
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Jumlah 1x pakai
Tenaga Jumlah (I) 2x pakai
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 bekisting untuk balok
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.018 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 bekisting untuk balok (menggunakan bambu)
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.018 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 bekisting untuk balok (menggunakan bambu) 2x pakai
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.018 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Jumlah 1x pakai
Tenaga Jumlah (I) 2x pakai
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 bekisting untuk lantai
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
6.000 Btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 bekisting untuk plat lantai (menggunakan bambu)
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
6.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 bekisting untuk plat lantai (menggunakan bambu) 2xpakai
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
6.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Jumlah 1x pakai
Tenaga Jumlah (I) 2x pakai
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 bekisting untuk plat lantai (tanpa stegger)
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m2 bekisting untuk dinding
Bahan
0.030 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.020 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
3.000 Btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m2 bekisting untuk dinding (menggunakan bambu)
Bahan
0.030 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.020 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
3.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 bekisting untuk dinding (menggunakan bambu) 2x pakai
Bahan
0.030 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.020 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
3.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Jumlah bahan 1x pakai
Tenaga Jumlah (I) bahan 2x pakai
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m2 bekisting untuk tangga
Bahan
0.030 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 bekisting untuk tangga (menggunakan bambu)
Bahan
0.030 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.26 Memasang 1 m2 jembatan untuk pengecoran beton
Bahan
0.0264 m3 Kayu kelas III (papan) @ Rp. 4,168,700.00
0.600 kg Paku usuk 4" @ Rp. 14,000.00
0.500 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.26 Memasang 1 m2 jembatan untuk pengecoran beton (menggunakan bambu)
Bahan
0.026 m3 Kayu kelas III (papan) @ Rp. 4,168,700.00
0.600 kg Paku usuk 4" @ Rp. 14,000.00
0.500 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
6.28.1 Bahan
0.200 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
1.500 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
6.28.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.262 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.28 Membuat 1 m3 strous beton (150 kg besi + bekisting)
6.28.1 Bahan
0.200 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
1.500 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
6.28.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.262 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
6.29.1 Bahan
0.270 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
2.000 kg Paku usuk 4" @ Rp. 14,000.00
210.000 kg Besi beton polos @ Rp. 10,000.00
3.000 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
6.29.2 Tenaga Jumlah (I)
5.650 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.560 OH Tukang kayu @ Rp. 90,000.00
1.400 OH Tukang Besi @ Rp. 75,000.00
0.323 OH Kepala Tukang Batu @ Rp. 90,000.00
0.283 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
6.30.1 Bahan
0.400 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
4.000 kg Paku usuk 4" @ Rp. 14,000.00
315.000 kg Besi beton polos @ Rp. 10,000.00
4.500 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
0.150 m3 Kayu balok @ Rp. 4,168,700.00
3.500 lembar Plywood tebal 6 mm @ Rp. 97,750.00
20.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.30.2 Tenaga Jumlah (I)
7.050 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.650 OH Tukang kayu @ Rp. 90,000.00
2.100 OH Tukang Besi @ Rp. 75,000.00
0.403 OH Kepala Tukang Batu @ Rp. 90,000.00
0.353 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) / menggunakan bambu
6.30.1 Bahan
0.400 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
4.000 kg Paku usuk 4" @ Rp. 14,000.00
315.000 kg Besi beton polos @ Rp. 10,000.00
4.500 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
0.150 m3 Kayu balok @ Rp. 4,168,700.00
3.500 lembar Plywood tebal 6 mm @ Rp. 97,750.00
20.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.30.2 Tenaga Jumlah (I)
7.050 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.650 OH Tukang kayu @ Rp. 90,000.00
2.100 OH Tukang Besi @ Rp. 75,000.00
0.403 OH Kepala Tukang Batu @ Rp. 90,000.00
0.353 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
6.31.1 Bahan
0.320 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
210.000 kg Besi beton polos @ Rp. 10,000.00
3.000 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
0.140 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
16.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.31.2 Tenaga Jumlah (I)
6.350 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.650 OH Tukang kayu @ Rp. 90,000.00
1.400 OH Tukang Besi @ Rp. 75,000.00
0.333 OH Kepala Tukang Batu @ Rp. 90,000.00
0.318 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) / menggunakan bambu
6.31.1 Bahan
0.320 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
210.000 kg Besi beton polos @ Rp. 10,000.00
3.000 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
0.140 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
16.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.31.2 Tenaga Jumlah (I)
6.350 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.650 OH Tukang kayu @ Rp. 90,000.00
1.400 OH Tukang Besi @ Rp. 75,000.00
0.333 OH Kepala Tukang Batu @ Rp. 90,000.00
0.318 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.32 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)
6.32.1 Bahan
0.320 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
0.120 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
32.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.32.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.265 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.32 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting) / menggunakan bambu
6.32.1 Bahan
0.320 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
0.120 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
32.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.32.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.265 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
6.33.1 Bahan
0.240 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
0.160 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
24.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.33.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.262 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) / menggunakan bambu
6.33.1 Bahan
0.240 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
0.160 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
24.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.33.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.262 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
6.34.1 Bahan
0.250 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.000 kg Paku usuk 4" @ Rp. 14,000.00
210.000 kg Besi beton polos @ Rp. 10,000.00
3.000 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
0.105 m3 Kayu balok @ Rp. 4,168,700.00
2.500 lembar Plywood tebal 6 mm @ Rp. 97,750.00
14.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.34.2 Tenaga Jumlah (I)
5.650 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.560 OH Tukang kayu @ Rp. 90,000.00
1.400 OH Tukang Besi @ Rp. 75,000.00
0.323 OH Kepala Tukang Batu @ Rp. 90,000.00
0.283 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) / menggunakan bambu
6.34.1 Bahan
0.250 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.000 kg Paku usuk 4" @ Rp. 14,000.00
210.000 kg Besi beton polos @ Rp. 10,000.00
3.000 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
0.105 m3 Kayu balok @ Rp. 4,168,700.00
2.500 lembar Plywood tebal 6 mm @ Rp. 97,750.00
14.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.34.2 Tenaga Jumlah (I)
5.650 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.560 OH Tukang kayu @ Rp. 90,000.00
1.400 OH Tukang Besi @ Rp. 75,000.00
0.323 OH Kepala Tukang Batu @ Rp. 90,000.00
0.283 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
6.35.1 Bahan
0.002 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.010 kg Paku usuk 4" @ Rp. 14,000.00
3.000 kg Besi beton polos @ Rp. 10,000.00
0.045 0.450 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
4.000 kg Semen PC @ Rp. 1,370.00
0.006 m3 Pasir beton @ Rp. 200,000.00
0.009 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
6.35.2 Tenaga Jumlah (I)
0.180 OH Pekerja @ Rp. 60,000.00
0.020 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Tukang kayu @ Rp. 90,000.00
0.020 OH Tukang Besi @ Rp. 75,000.00
0.006 OH Kepala Tukang Batu @ Rp. 90,000.00
0.009 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
6.36.1 Bahan
0.003 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.020 kg Paku usuk 4" @ Rp. 14,000.00
3.600 kg Besi beton polos @ Rp. 10,000.00
0.050 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
5.500 kg Semen PC @ Rp. 1,370.00
0.009 m3 Pasir beton @ Rp. 200,000.00
0.015 m3 Batu pecah 2 - 3 (mesin) @ Rp. 275,000.00
6.36.2 Tenaga Jumlah (I)
0.297 OH Pekerja @ Rp. 60,000.00
0.033 OH Tukang Batu @ Rp. 70,000.00
0.033 OH Tukang kayu @ Rp. 90,000.00
0.033 OH Tukang Besi @ Rp. 75,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1 1 m3 Membuat beton tumbuk 1 Pc : 3 Pb : 5 Kr
6.1.1 Bahan
200.000 kg Semen PC @ Rp. 1,370.00
0.522 m3 Pasir beton @ Rp. 200,000.00
0.862 m3 Batu krikil @ Rp. 141,750.00
6.1.2 Tenaga Jumlah (I)
1.320 OH Pekerja @ Rp. 60,000.00
0.220 OH Tukang Batu @ Rp. 70,000.00
0.022 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
V. ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
6.1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
6.1.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
43.500 kg Semen PC @ Rp. 1,370.00
0.080 m3 Pasir pasang @ Rp. 185,000.00
6.1.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
6.2.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
32.950 kg Semen PC @ Rp. 1,370.00
0.091 m3 Pasir pasang @ Rp. 185,000.00
6.2.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
6.3.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
26.550 kg Semen PC @ Rp. 1,370.00
0.093 m3 Pasir pasang @ Rp. 185,000.00
6.3.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
6.4.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
22.200 kg Semen PC @ Rp. 1,370.00
0.102 m3 Pasir pasang @ Rp. 185,000.00
6.4.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP
6.5.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
18.500 kg Semen PC @ Rp. 1,370.00
0.122 m3 Pasir pasang @ Rp. 185,000.00
6.5.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP
6.6.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
10.080 kg Semen PC @ Rp. 1,370.00
0.0925 m3 Pasir pasang @ Rp. 185,000.00
0.0275 m3 Kapur pasang @ Rp. 409,600.00
6.6.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 2 PP
6.7.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
18.950 kg Semen PC @ Rp. 1,370.00
0.038 m3 Pasir pasang @ Rp. 185,000.00
6.7.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 3 PP
6.8.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
14.370 kg Semen PC @ Rp. 1,370.00
0.040 m3 Pasir pasang @ Rp. 185,000.00
6.8.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 4 PP
6.9.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
11.500 kg Semen PC @ Rp. 1,370.00
0.043 m3 Pasir pasang @ Rp. 185,000.00
6.9.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 5 PP
6.10.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
9.680 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
6.10.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 6 PP
6.11.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
8.320 kg Semen PC @ Rp. 1,370.00
0.049 m3 Pasir pasang @ Rp. 185,000.00
6.11.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 8 PP
6.12.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
6.500 kg Semen PC @ Rp. 1,370.00
0.050 m3 Pasir pasang @ Rp. 185,000.00
6.12.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
6.22.1 Bahan
30.000 buah Roster @ Rp. 8,625.00
11.000 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6.22.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 P
6.23.1 Bahan
30.000 buah Roster @ Rp. 8,625.00
11.000 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6.23.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 dinding bata berongga ekspos ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 P
6,24,1 Bahan
70.000 buah Bata berongga ekspos @ Rp. 800.00
14.000 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6,24,2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan

VI. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN


6.1 Memasang 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm
6,1,1 Bahan
15.504 kg Semen PC @ Rp. 1,370.00
0.016 m3 Pasir pasang @ Rp. 185,000.00
6,1,2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm
6.2.1 Bahan
10.224 kg Semen PC @ Rp. 1,370.00
0.020 m3 Pasir pasang @ Rp. 185,000.00
6.2.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
6.3.1 Bahan
7.776 kg Semen PC @ Rp. 1,370.00
0.023 m3 Pasir pasang @ Rp. 185,000.00
6.3.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
6.4.1 Bahan
6.240 kg Semen PC @ Rp. 1,370.00
0.024 m3 Pasir pasang @ Rp. 185,000.00
6.4.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
6.5.1 Bahan
5.184 kg Semen PC @ Rp. 1,370.00
0.026 m3 Pasir pasang @ Rp. 185,000.00
6.5.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 15 mm
6,6,1 Bahan
4.416 kg Semen PC @ Rp. 1,370.00
0.027 m3 Pasir pasang @ Rp. 185,000.00
6,6,2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 Memasang 1 m2 plesteran 1 PC : 7 PP, tebal 15 mm
3,7,1 Bahan
3.936 kg Semen PC @ Rp. 1,370.00
0.028 m3 Pasir pasang @ Rp. 185,000.00
6,7,2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 m2 plesteran 1 PC : 8 PP, tebal 15 mm
6,8,1 Bahan
3.456 kg Semen PC @ Rp. 1,370.00
0.029 m3 Pasir pasang @ Rp. 185,000.00
6,8,2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 Memasang 1 m2 plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm
6,9,1 Bahan
5.760 kg Semen PC @ Rp. 1,370.00
0.003 m3 Kapur pasang @ Rp. 409,600.00
0.013 m3 Pasir pasang @ Rp. 185,000.00
6,9,2 Tenaga Jumlah (I)
0.360 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Batu @ Rp. 70,000.00
0.012 OH Kepala Tukang Batu @ Rp. 90,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 Memasang 1 m2 plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm
6.10.1 Bahan
3.000 kg Semen PC @ Rp. 1,370.00
0.005 m3 Kapur pasang @ Rp. 409,600.00
0.020 m3 Pasir pasang @ Rp. 185,000.00
6.10.2 Tenaga Jumlah (I)
0.360 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Batu @ Rp. 70,000.00
0.012 OH Kepala Tukang Batu @ Rp. 90,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m2 plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm
6,11,1 Bahan
0.009 m3 Semen PC @ Rp. 1,370.00
0.009 m3 Kapur pasang @ Rp. 409,600.00
0.009 m3 Pasir pasang @ Rp. 185,000.00
6,11,2 Tenaga Jumlah (I)
0.440 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Batu @ Rp. 70,000.00
0.012 OH Kepala Tukang Batu @ Rp. 90,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm
6,12,1 Bahan
0.007 m3 Semen PC @ Rp. 1,370.00
0.007 m3 Kapur pasang @ Rp. 409,600.00
0.015 m3 Pasir pasang @ Rp. 185,000.00
6,12,2 Tenaga Jumlah (I)
0.360 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Batu @ Rp. 70,000.00
0.012 OH Kepala Tukang Batu @ Rp. 90,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm
6,13,1 Bahan
13.632 kg Semen PC @ Rp. 1,370.00
0.027 m3 Pasir pasang @ Rp. 185,000.00
6,13,2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.022 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm
6,14,1 Bahan
10.368 kg Semen PC @ Rp. 1,370.00
0.031 m3 Pasir pasang @ Rp. 185,000.00
6,14,2 Tenaga Jumlah (I)
0.260 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm
6,15,1 Bahan
8.320 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6,15,2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.022 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.16 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm
6,16,1 Bahan
6.912 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6,16,2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.022 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 20 mm
6,17,1 Bahan
5.888 kg Semen PC @ Rp. 1,370.00
0.036 m3 Pasir pasang @ Rp. 185,000.00
6,17,2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.022 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.18 Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm
6,18,1 Bahan
0.009 m3 Semen PC @ Rp. 1,370.00
0.009 m3 Kapur pasang @ Rp. 409,600.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
6,18,2 Tenaga Jumlah (I)
0.400 0.440 OH Pekerja @ Rp. 60,000.00
0.220 OH Tukang Batu @ Rp. 70,000.00
0.022 OH Kepala Tukang Batu @ Rp. 90,000.00
0.022 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.19 Memasang 1 m2 Berapen 1 PC : 5 PP, tebal 15 mm
6.19.1 Bahan
5.184 kg Semen PC @ Rp. 1,370.00
0.026 m3 Pasir pasang @ Rp. 185,000.00
6.19.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Batu @ Rp. 70,000.00
0.008 OH Kepala Tukang Batu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.20 Memasang 1 m’ Plesteran Skoning 1 PC : 2 PP, lebar 10 mm
6.20.1 Bahan
0.500 kg Semen PC @ Rp. 1,370.00
0.013 m3 Pasir pasang @ Rp. 185,000.00
6.20.2 Tenaga Jumlah (I)
0.080 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Batu @ Rp. 70,000.00
0.040 OH Kepala Tukang Batu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m’ Plesteran Skoning 1 PC : 3 PP, lebar 10 mm
6.20.1 Bahan
0.500 kg Semen PC @ Rp. 1,370.00
0.013 m3 Pasir pasang @ Rp. 185,000.00
6.20.2 Tenaga Jumlah (I)
0.080 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Batu @ Rp. 70,000.00
0.040 OH Kepala Tukang Batu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 Plesteran Ciprat 1 PC : 2 PP
6.23.1 Bahan
4.320 kg Semen PC @ Rp. 1,370.00
0.006 m3 Pasir pasang @ Rp. 185,000.00
6.23.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 finishing siar pasangan dinding bata merah (=20 m’)
6.24.1 Bahan
3.180 3.108 kg Semen PC @ Rp. 1,370.00
6.24.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Batu @ Rp. 70,000.00
0.008 OH Kepala Tukang Batu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m’)
6.25.1 Bahan
1.600 kg Semen PC @ Rp. 1,370.00
6.25.2 Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.035 OH Tukang Batu @ Rp. 70,000.00
0.004 OH Kepala Tukang Batu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.26 Memasang 1 m2 finishing siar pasangan batu kali campuran 1 PC : 2 PP
6.26.1 Bahan
6.340 kg Semen PC @ Rp. 1,370.00
0.012 m3 Pasir pasang @ Rp. 185,000.00
6.26.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.27 Memasang 1 m2 acian
6.27.1 Bahan
3.250 kg Semen PC @ Rp. 1,370.00
6.27.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.27 Memasang 1 m' benangan
6.27.1 Bahan
3.000 kg Semen PC @ Rp. 1,370.00
6.27.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan

VII. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU


6.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I ( ky. Jati )
6.1.1 Bahan
1.100 m3 Kayu jati balok 8/12, 6/12 @ Rp. 19,001,200.00
1.250 kg Paku usuk 4" @ Rp. 14,000.00
1.000 kg Lem kayu @ Rp. 28,750.00
6.1.2 Tenaga Jumlah (I)
7.000 OH Pekerja @ Rp. 60,000.00
21.000 OH Tukang Kayu @ Rp. 90,000.00
2.100 OH Kepala Tukang kayu @ Rp. 90,000.00
0.350 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II ( ky. Kamper )
6.2.1 Bahan
1.200 m3 Kayu kamper balok 6/12 @ Rp. 9,660,000.00
1.250 kg Paku usuk 4" @ Rp. 14,000.00
1.000 kg Thinner @ Rp. 21,000.00
6.2.2 Tenaga Jumlah (I)
6.000 OH Pekerja @ Rp. 60,000.00
18.000 OH Tukang Kayu @ Rp. 90,000.00
1.800 OH Kepala Tukang kayu @ Rp. 90,000.00
0.300 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II ( ky. Kamper )
6.3.1 Bahan
0.040 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.050 kg Paku usuk 4" @ Rp. 14,000.00
6.3.2 Tenaga Jumlah (I)
0.350 OH Pekerja @ Rp. 60,000.00
1.050 OH Tukang Kayu @ Rp. 90,000.00
0.105 OH Kepala Tukang kayu @ Rp. 90,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5a Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I ( ky. Jati )
6.5a.1 Bahan
0.040 m3 Kayu jati papan 2/20 x 2 m @ Rp. 18,174,450.00
0.500 kg Paku usuk 4" @ Rp. 14,000.00
6.5a.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
3.000 OH Tukang Kayu @ Rp. 90,000.00
0.300 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5b Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II (ky kamper)
6.5b.1 Bahan
0.040 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.500 kg Paku usuk 4" @ Rp. 14,000.00
6.5b.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
3.000 OH Tukang Kayu @ Rp. 90,000.00
0.300 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6a Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I (kayu jati)
6.6.1 Bahan
0.024 m3 Kayu jati papan 2/20 x 2 m @ Rp. 18,174,450.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
6.6.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
2.400 OH Tukang Kayu @ Rp. 90,000.00
0.240 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6b Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II (kayu kamper)
6.6.1 Bahan
0.024 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
6.6.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
2.400 OH Tukang Kayu @ Rp. 90,000.00
0.240 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7a Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I (kayu jati)
6.7.1 Bahan
0.064 m3 Kayu jati papan 2/20 x 2 m @ Rp. 18,174,450.00
0.500 kg Lem kayu @ Rp. 28,750.00
6.7.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
3.000 OH Tukang Kayu @ Rp. 90,000.00
0.300 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7b Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas II (kayu kamper)
6.7.1 Bahan
0.064 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.500 kg Lem kayu @ Rp. 28,750.00
6.7.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
3.000 OH Tukang Kayu @ Rp. 90,000.00
0.300 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamper (lebar sampai 90 cm)
6.8.1 Bahan
0.025 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.030 kg Paku reng 2" @ Rp. 11,875.00
0.500 kg Lem kayu @ Rp. 28,750.00
1.000 lembar Plywood tebal 4 mm @ Rp. 77,625.00
6.8.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
2.100 OH Tukang Kayu @ Rp. 90,000.00
0.210 OH Kepala Tukang kayu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9a Membuat 1 m2 pintu plywood rangkap, rangka expose kayu jati
6.9.1 Bahan
0.0256 m3 Kayu jati papan 2/20 x 2 m @ Rp. 18,174,450.00
0.030 kg Paku reng 2" @ Rp. 11,875.00
0.500 kg Lem kayu @ Rp. 28,750.00
1.000 lembar Plywood tebal 4 mm @ Rp. 77,625.00
6.9.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
2.400 OH Tukang Kayu @ Rp. 90,000.00
0.240 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9b Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kamper
6.9.1 Bahan
0.0256 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.030 kg Paku reng 2" @ Rp. 11,875.00
0.500 kg Lem kayu @ Rp. 28,750.00
1.000 lembar Plywood tebal 4 mm @ Rp. 77,625.00
6.9.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
2.400 OH Tukang Kayu @ Rp. 90,000.00
0.240 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10a Memasang 1 m2 jalusi kusen, kayu jati
6.10.1 Bahan
0.060 m3 Kayu jati usuk 5/7, 4/6, 3/5 @ Rp. 14,044,150.00
0.150 kg Paku reng 2" @ Rp. 11,875.00
6.10.2 Tenaga Jumlah (I)
0.670 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10b Memasang 1 m2 jalusi kusen, kayu kamper
6.10.1 Bahan
0.060 m3 Kayu kamper usuk 5/7 @ Rp. 7,187,500.00
0.150 kg Paku reng 2" @ Rp. 11,875.00
6.10.2 Tenaga Jumlah (I)
0.670 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10b Memasang 1 m2 jalusi kusen, kayu ulin
6.10.1 Bahan
0.060 m3 Kayu Ulin (Papan) @ Rp. 17,500,000.00
0.150 kg Paku reng 2" @ Rp. 11,875.00
6.10.2 Tenaga Jumlah (I)
0.670 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m2 teakwood rangkap, rangka expose kayu kamper
6.11.1 Bahan
0.025 m3 Kayu kamper usuk 5/7 @ Rp. 7,187,500.00
0.030 kg Paku reng 2" @ Rp. 11,875.00
0.300 kg Lem kayu @ Rp. 28,750.00
1.000 lembar Teakwood tebal 4 mm @ Rp. 123,625.00
6.11.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
2.400 OH Tukang Kayu @ Rp. 90,000.00
0.240 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kruing
6.13.1 Bahan
1.100 m3 Kayu kruing balok 8/12 @ Rp. 7,935,000.00
15.000 kg Besi strip 2 cm @ Rp. 20,450.00
5.600 kg Paku dur 5" @ Rp. 8,450.00
6.13.2 Tenaga Jumlah (I)
4.000 OH Pekerja @ Rp. 60,000.00
12.000 OH Tukang Kayu @ Rp. 90,000.00
1.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.200 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 Memasang 1 m3 konstruksi kuda-kuda expose, kayu kelas I / ky.jati
6.14.1 Bahan
1.200 m3 Kayu jati balok 8/12, 6/12 @ Rp. 19,001,200.00
15.000 kg Besi strip 2 cm @ Rp. 20,450.00
5.600 kg Paku dur 5" @ Rp. 8,450.00
6.14.2 Tenaga Jumlah (I)
6.700 OH Pekerja @ Rp. 60,000.00
20.010 OH Tukang Kayu @ Rp. 90,000.00
2.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Memasang 1 m3 konstruksi gordeng, kayu kelas II / ky.meranti
6.15.1 Bahan
1.100 m3 Kayu meranti balok 6/12 @ Rp. 5,750,000.00
15.000 kg Besi strip 2 cm @ Rp. 20,450.00
3.000 kg Paku dur 5" @ Rp. 8,450.00
6.15.2 Tenaga Jumlah (I)
2.400 6.700 OH Pekerja @ Rp. 60,000.00
7.200 20.100 OH Tukang Kayu @ Rp. 90,000.00
0.720 2.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.120 0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Memasang 1 m3 konstruksi gordeng, kayu kelas II / ky.kruing
6.15.1 Bahan
1.100 m3 Kayu kruing balok 8/12 @ Rp. 7,935,000.00
15.000 kg Besi strip 2 cm @ Rp. 20,450.00
3.000 kg Paku dur 5" @ Rp. 8,450.00
6.15.2 Tenaga Jumlah (I)
2.400 6.700 OH Pekerja @ Rp. 60,000.00
7.200 20.100 OH Tukang Kayu @ Rp. 90,000.00
0.720 2.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.120 0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.16 Memasang 1 m2 rangka atap genteng keramik, kayu kelas I / usuk ky. Kruing, reng kamper
6.16.1 Bahan
0.014 m3 Kayu kruing usuk 5/7 @ Rp. 6,037,500.00
0.0036 0.0360 m3 Kayu kamper reng 2/3, 3/5 @ Rp. 7,187,500.00
0.250 kg Paku usuk 4" @ Rp. 14,000.00
6.16.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Memasang 1 m2 rangka atap genteng beton, kayu kelas II / usuk ky. Kruing, reng kamper
6.17.1 Bahan
0.014 m3 Kayu kruing usuk 5/7 @ Rp. 6,037,500.00
0.0057 0.0570 m3 Kayu kamper reng 2/3, 3/5 @ Rp. 7,187,500.00
0.250 kg Paku usuk 4" @ Rp. 14,000.00
6.17.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.18 Memasang 1 m2 rangka atap sirap, kayu kelas II / ky.kruing
6.18.1 Bahan
0.014 m3 Kayu kruing balok 6/12 @ Rp. 7,935,000.00
0.057 kg Paku usuk 4" @ Rp. 14,000.00
6.18.2 Tenaga Jumlah (I)
0.120 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Kayu @ Rp. 90,000.00
0.012 OH Kepala Tukang kayu @ Rp. 90,000.00
0.006 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.19 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III / ky. meranti
6.19.1 Bahan
0.0154 m3 Kayu meranti usuk 5/7 @ Rp. 4,887,500.00
0.200 kg Paku usuk 4" @ Rp. 14,000.00
6.19.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang Kayu @ Rp. 90,000.00
0.030 OH Kepala Tukang kayu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.20 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III / ky. meranti
6.20.1 Bahan
0.0163 m3 Kayu meranti usuk 5/7 @ Rp. 4,887,500.00
0.250 kg Paku usuk 4" @ Rp. 14,000.00
6.20.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang Kayu @ Rp. 90,000.00
0.030 OH Kepala Tukang kayu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II / ky. Kamper
6.21a.1 Bahan
0.0108 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.100 kg Paku usuk 4" @ Rp. 14,000.00
6.21a.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.21a Memasang 1 m1 lisplank ukuran (2 x 20) cm, kayu kelas I atau kelas II / ky. Kamper
6.21a.1 Bahan
0.011 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.100 kg Paku usuk 4" @ Rp. 14,000.00
6.21a.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.21b Memasang 1 m1 lisplank ukuran (2 x 20) cm, kayu kelas I atau kelas II / ky. Meranti
6.21b.1 Bahan
0.011 m3 Kayu meranti papan 2/20 x 4 m @ Rp. 6,497,500.00
0.100 kg Paku usuk 4" @ Rp. 14,000.00
6.21b.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22a Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II / ky. Kamper
6.22a.1 Bahan
0.011 m3 Kayu kamper papan 2/30 x 4 m @ Rp. 11,500,000.00
0.050 kg Paku usuk 4" @ Rp. 14,000.00
6.22a.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22b Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II / ky. Meranti
6.22b.1 Bahan
0.011 m3 Kayu meranti papan 3/20 x 4 m @ Rp. 6,497,500.00
0.050 kg Paku usuk 4" @ Rp. 14,000.00
6.22b.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III / ky. Meranti
6.23.1 Bahan
0.028 m3 Kayu meranti balok 6/12 @ Rp. 5,750,000.00
0.150 kg Paku usuk 4" @ Rp. 14,000.00
6.23.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Kayu @ Rp. 90,000.00
0.045 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II / ky. Meranti
6.24.1 Bahan
0.028 m3 Kayu meranti balok 6/12 @ Rp. 5,750,000.00
0.150 kg Paku usuk 4" @ Rp. 14,000.00
0.860 lembar Teakwood tebal 4 mm @ Rp. 123,625.00
0.560 kg Lem kayu @ Rp. 28,750.00
6.24.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Kayu @ Rp. 90,000.00
0.045 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II / ky. Meranti
6.25.1 Bahan
0.028 m3 Kayu meranti balok 6/12 @ Rp. 5,750,000.00
0.150 kg Paku usuk 4" @ Rp. 14,000.00
0.860 lembar Teakwood tebal 4 mm @ Rp. 123,625.00
0.560 kg Lem kayu @ Rp. 28,750.00
6.25.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.600 OH Tukang Kayu @ Rp. 90,000.00
0.060 OH Kepala Tukang kayu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pasang usuk ky.kruing 5/7 dan reng ky.kamper 2/3
Bahan
0.011 m3 Kayu meranti usuk 5/7 @ Rp. 4,887,500.00
0.004 m3 Kayu kamper reng 2/3, 3/5 @ Rp. 7,187,500.00
0.025 kg Paku usuk 4" @ Rp. 14,000.00
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Pasang papan reuter (analis BOW)
Bahan
0.004 m3 Kayu meranti papan 2/20 x 4 m @ Rp. 6,497,500.00
0.020 kg Paku reng 2" @ Rp. 11,875.00
Tenaga Jumlah (I)
0.028 OH Pekerja @ Rp. 60,000.00
0.080 OH Tukang Kayu @ Rp. 90,000.00
0.008 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m1 Calsiplank (20 x 1)
Bahan
0.367 Lmbr Kalsiplank 9 mm @ Rp. 78,775.00
0.180 Lnjr Hollow 2/4 - 4m @ Rp. 25,875.00
0.100 kg Paku reng 2" @ Rp. 11,875.00
Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 Bh Pintu PVC Lengkap
Bahan
1.100 m Pintu PVC lengkap @ Rp. 273,125.00
Tenaga Jumlah (I)
0.206 OH Pekerja @ Rp. 60,000.00
0.206 OH Tukang Kayu @ Rp. 90,000.00
0.021 OH Kepala Tukang kayu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan

VIII. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI DAN DINDING


Memasang 1 m2 lantai ubin PC abu-abu ukuran 30 cm x 30 cm
6.5a.1 Bahan
11.870 buah Tegel teraso 30 x 30 cm @ Rp. 4,454.55
10.000 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
6.5b.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.125 OH Tukang batu @ Rp. 70,000.00
0.013 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5a Memasang 1 m2 lantai tegel badak hitam ( 30 x 30 ) cm
6.5a.1 Bahan
11.870 buah Tegel Badag Hitam 30/30 @ Rp. 4,559.09
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
6.5b.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.125 OH Tukang Batu @ Rp. 70,000.00
0.013 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5b Memasang 1 m2 lantai tegel badak merah ( 30 x 30 ) cm
6.5b.1 Bahan
11.870 buah Tegel Badag Merah 30/30 @ Rp. 4,559.09
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
6.5b.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.125 OH Tukang Batu @ Rp. 70,000.00
0.013 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 Memasang 1 m2 lantai ubin warna ( 20 x 20 ) cm
6.6.1 Bahan
26.500 buah Ubin warna 20 x 20 cm @ Rp. 1,868.00
10.400 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.620 1.000 kg Semen Warna @ Rp. 12,650.00
6.6.2 Tenaga Jumlah (I)
0.270 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Batu @ Rp. 70,000.00
0.014 OH Kepala Tukang Batu @ Rp. 90,000.00
0.014 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8a Memasang 1 m2 lantai ubin teraso ( 30 x 30 ) cm
6.8a.1 Bahan
11.870 buah Tegel teraso 30 x 30 cm @ Rp. 4,454.55
10.000 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.500 kg Semen Warna @ Rp. 12,650.00
6.8a.2 Tenaga Jumlah (I)
0.260 OH Pekerja @ Rp. 60,000.00
0.130 OH Tukang Batu @ Rp. 70,000.00
0.013 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8b Memasang 1 m2 lantai ubin teraso ( 20 x 20 ) cm
6.8b.1 Bahan
26.500 buah Tegel teraso 20 x 20 cm @ Rp. 2,292.00
10.400 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.620 kg Semen Warna @ Rp. 12,650.00
6.8b.2 Tenaga Jumlah (I)
0.270 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Batu @ Rp. 70,000.00
0.014 OH Kepala Tukang Batu @ Rp. 90,000.00
0.014 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Memasang 1 m2 lantai ubin PC abu - abu ( 20 x 20 ) cm
6.3.1 Bahan
26.500 buah Tegel PC abu-abu 20 x 20 cm @ Rp. 1,574.00
10.400 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
6.3.2 Tenaga Jumlah (I)
0.270 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Batu @ Rp. 70,000.00
0.014 OH Kepala Tukang Batu @ Rp. 90,000.00
0.014 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
6.32 Memasang 1 m2 lantai keramik artistik ukuran (10 x 20) cm
6.32.1 Bahan
53.000 buah Tegel keramik 10 x 20 cm motif @ Rp. 1,455.00
8.190 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
2.750 kg Semen Warna @ Rp. 12,650.00
6.32.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35a Memasang 1 m2 lantai keramik ukuran (30 x 30) cm / polos
6.35a.1 Bahan
11.80 1.050 doos Tegel keramik 30 x 30 cm polos @ Rp. 47,000.00
10.000 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.50 0.500 kg Semen Warna @ Rp. 12,650.00
6.35a.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35b Memasang 1 m2 lantai keramik ukuran (30 x 30) cm / warna / motif / tekstur
6.35b.1 Bahan
11.80 1.050 doos Tegel keramik 30 x 30 cm motif @ Rp. 49,000.00
10.000 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.50 0.500 kg Semen Warna @ Rp. 12,650.00
6.35b.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35c Memasang 1 m2 lantai keramik ukuran (40 x 40) cm / polos
6.35c.1 Bahan
6.630 buah Tegel keramik 40 x 40 cm polos @ Rp. 8,376.00
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.300 kg Semen Warna @ Rp. 12,650.00
6.35c.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35d Memasang 1 m2 lantai keramik ukuran (40 x 40) cm / warna / motif / tekstur
6.35d.1 Bahan
6.630 buah Tegel keramik 40 x 40 cm motif @ Rp. 9,088.00
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.300 kg Semen Warna @ Rp. 12,650.00
6.35d.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.36a Memasang 1 m2 lantai keramik ukuran (20 x 20) cm / polos
6.36a.1 Bahan
26.50 1.050 doos Tegel keramik 20 x 20 cm polos @ Rp. 2,120.00
10.400 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.62 0.500 kg Semen Warna @ Rp. 12,650.00
6.36a.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.36b Memasang 1 m2 lantai keramik ukuran (20 x 20) cm / warna / motif / tekstur
6.36b.1 Bahan
26.50 1.050 doos Tegel keramik 20 x 20 cm motif @ Rp. 2,460.00
10.400 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.62 0.500 kg Semen Warna @ Rp. 12,650.00
6.36b.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.39 Memasang 1 m’ plint keramik ukuran (10 x 20) cm
6.39.1 Bahan
5.300 buah Tegel keramik 10 x 20 cm motif @ Rp. 1,455.00
1.140 kg Semen PC @ Rp. 1,370.00
0.003 m3 Pasir pasang @ Rp. 185,000.00
0.025 kg Semen Warna @ Rp. 12,650.00
6.39.2 Tenaga Jumlah (I)
0.090 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Batu @ Rp. 70,000.00
0.0035 0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m’ plint kuku macan
Bahan
12.000 buah Kuku Macan @ Rp. 920.00
0.114 kg Semen PC @ Rp. 1,370.00
0.001 m3 Pasir pasang @ Rp. 185,000.00
0.005 kg Semen Warna @ Rp. 12,650.00
Tenaga Jumlah (I)
0.090 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Batu @ Rp. 70,000.00
0.009 OH Kepala Tukang Batu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.44 Memasang 1 m2 lantai karpet
6.39.1 Bahan
1.050 m2 Karpet @ Rp. 19,360.00
0.350 kg Lem kayu @ Rp. 28,750.00
6.39.2 Tenaga Jumlah (I)
0.170 OH Pekerja @ Rp. 60,000.00
0.170 OH Tukang Kayu @ Rp. 90,000.00
0.017 OH Kepala Tukang kayu @ Rp. 90,000.00
0.009 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Parquet Kayu
Bahan
1.050 m2 Parquet kayu jati @ Rp. 363,489.00
0.600 kg Lem kayu @ Rp. 28,750.00
Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Kayu @ Rp. 90,000.00
0.035 OH Kepala Tukang kayu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Kayu Gymfloor
Bahan
1.050 m2 Parquet Gymfloor @ Rp. 450,000.00
0.600 kg Lem kayu @ Rp. 28,750.00
Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Kayu @ Rp. 90,000.00
0.035 OH Kepala Tukang kayu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.44 Memasang 1 m2 underlayer/pelapis bawah karpet
6.39.1 Bahan
1.050 m2 Underlayer / rubber corrugated @ Rp. 52,500.00
0.350 kg Lem kayu @ Rp. 28,750.00
6.39.2 Tenaga Jumlah (I)
0.120 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Kayu @ Rp. 90,000.00
0.012 OH Kepala Tukang kayu @ Rp. 90,000.00
0.006 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.48 Memasang 1 m2 dinding porselen ukuran (11 x 11) cm
6.48.1 Bahan
86.00 1.050 doos Tegel porselen 11 x 11 cm @ Rp. 595.12
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
1.50 0.500 kg Semen Warna @ Rp. 12,650.00
6.48.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Batu @ Rp. 70,000.00
0.050 OH Kepala Tukang Batu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.51 Memasang 1 m2 dinding keramik artistik ukuran (10 x 20) cm
6.51.1 Bahan
53.000 buah Tegel keramik 10 x 20 cm motif @ Rp. 1,455.00
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
2.750 kg Semen Warna @ Rp. 12,650.00
6.51.2 Tenaga Jumlah (I)
0.900 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.52 Memasang 1 m2 dinding keramik ukuran (20 x 25) cm polos
6.53.1 Bahan
20.000 buah Tegel keramik 20 x 25 cm polos @ Rp. 3,375.00
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
2.750 kg Semen Warna @ Rp. 12,650.00
6.53.2 Tenaga Jumlah (I)
0.900 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.53 Memasang 1 m2 dinding keramik ukuran (20 x 25) cm / warna / motif / tekstur
6.53.1 Bahan
20.000 buah Tegel keramik 20 x 25 cm motif @ Rp. 3,750.00
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
2.750 kg Semen Warna @ Rp. 12,650.00
6.53.2 Tenaga Jumlah (I)
0.900 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.54a Memasang 1 m2 dinding keramik ukuran (20 x 20) cm / polos
6.54a.1 Bahan
26.500 buah Tegel keramik 20 x 20 cm polos @ Rp. 2,120.00
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
1.940 kg Semen Warna @ Rp. 12,650.00
6.54a.2 Tenaga Jumlah (I)
0.900 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.54b Memasang 1 m2 dinding keramik ukuran (20 x 20) cm / warna / motif / tekstur
6.54b.1 Bahan
26.500 buah Tegel keramik 20 x 20 cm motif @ Rp. 2,460.00
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
1.940 kg Semen Warna @ Rp. 12,650.00
6.54b.2 Tenaga Jumlah (I)
0.900 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.57 Memasang 1 m2 dinding batu alam / palimanan
6.57.1 Bahan
1.100 m2 Batu alam/ palimanan @ Rp. 109,050.00
11.750 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6.57.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.58 Memasang 1 m2 dinding batu tempel hitam
6.58.1 Bahan
1.100 m2 Batu Candi Polos 15/30 @ Rp. 149,000.00
11.750 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6.58.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.59 Memasang 1 m2 dinding batu lempeng
6.58.1 Bahan
1.100 m2 Batu Lempeng @ Rp. 109,250.00
11.750 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6.58.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.59 Memasang 1 m2 dinding batu candi
6.58.1 Bahan
1.250 m2 Batu Alur Candi @ Rp. 192,450.00
5.000 kg Semen PC @ Rp. 1,370.00
0.025 m3 Pasir pasang @ Rp. 185,000.00
6.58.2 Tenaga Jumlah (I)
0.240 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Batu @ Rp. 70,000.00
0.012 OH Kepala Tukang Batu @ Rp. 90,000.00
0.024 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 Memasang 1 m2 wallpaper, lebar 50 cm
6,60,1 Bahan
2.200 m Wallpaper @ Rp. 2,045.00
0.250 kg Lem kayu @ Rp. 28,750.00
6,60,2 Tenaga Jumlah (I)
0.350 OH Pekerja @ Rp. 60,000.00
0.175 OH Tukang Kayu @ Rp. 90,000.00
0.017 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m’ Step noising
Bahan
1.100 buah Stepnosing @ Rp. 45,000.00
0.003 m3 Pasir pasang @ Rp. 185,000.00
0.025 kg Semen Warna @ Rp. 12,650.00
Tenaga Jumlah (I)
0.045 OH Pekerja @ Rp. 60,000.00
0.045 OH Tukang Batu @ Rp. 70,000.00
0.005 OH Kepala Tukang Batu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Granite ukuran (30 x 30) cm
Bahan
11.870 buah Granite Tile 30 x 30 @ Rp. 12,713.64
10.000 kg Semen Pc @ Rp. 1,370.00
1.500 kg Semen Warna @ Rp. 12,650.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
Tenaga Jumlah (I)
0.260 OH Pekerja @ Rp. 60,000.00
0.130 OH Tukang Batu @ Rp. 70,000.00
0.013 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Granite Tile ukuran (60 x 60) cm
Bahan
2.917 buah Granite Tile 60 x 60 @ Rp. 59,762.50
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.300 kg Semen Warna @ Rp. 12,650.00
Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Granite Tile ukuran (60 x 60) cm Ex. Granito
Bahan
2.917 buah Granite Tile 60 x 60 Ex. Granito @ Rp. 161,191.67
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.300 kg Semen Warna @ Rp. 12,650.00
Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Granite Tile ukuran (30 x 60) cm
Bahan
5.833 buah Granite Tile 30 x 60 @ Rp. 32,793.75
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.300 kg Semen Warna @ Rp. 12,650.00
Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 dinding Marmer ukuran (100 x 100) cm
Bahan
1.050 buah Batu Marmer @ Rp. 315,000.00
12.440 kg Semen PC @ Rp. 1,370.00
0.025 m3 Pasir pasang @ Rp. 185,000.00
0.650 kg Semen Warna @ Rp. 12,650.00
Tenaga Jumlah (I)
1.300 OH Pekerja @ Rp. 60,000.00
0.650 OH Tukang Batu @ Rp. 70,000.00
0.065 OH Kepala Tukang Batu @ Rp. 90,000.00
0.065 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan

IX. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT


6.1a Memasang 1 m2 langit-langit asbes semen, tebal 4 mm
6.1a.1 Bahan
1.100 m2 Asbes datar tebal 4 mm (60 x 200) @ Rp. 39,750.00
0.010 kg Paku payung @ Rp. 20,500.00
6.1a.2 Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1b Memasang 1 m2 langit-langit asbes semen, tebal 5 mm
6.1b.1 Bahan
1.100 m2 Asbes datar tebal 5 mm (60 x 200) @ Rp. 51,200.00
0.010 kg Paku payung @ Rp. 20,500.00
6.1b.2 Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1c Memasang 1 m2 langit-langit asbes semen, tebal 6 mm
6.1c.1 Bahan
1.100 m2 Asbes datar tebal 6 mm (40 x 200) @ Rp. 57,850.00
0.010 kg Paku payung @ Rp. 20,500.00
6.1c.2 Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm
6.5.1 Bahan
0.375 lembar Triplek tebal 3 mm (1,22 x 2,44) @ Rp. 62,675.00
0.030 kg Paku triplek @ Rp. 12,075.00
6.5.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 Memasang 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
6.7.1 Bahan
0.364 lembar Gypsum board 9 mm @ Rp. 96,312.50
0.110 kg Paku skrup @ Rp. 20,125.00
6.7.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 langit-langit Calsiboard ukuran (120x240x4) mm, tebal 4 mm
Bahan
0.364 lembar Kalsiboard 4 mm @ Rp. 56,350.00
0.110 kg Paku skrup @ Rp. 20,125.00
Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 langit-langit lambrisering kayu tebal 9 mm
Bahan
0.015 m3 Kayu jati papan 2/20 x 2 m @ Rp. 18,174,450.00
0.010 kg Paku triplek @ Rp. 12,075.00
Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
0.800 OH Tukang Kayu @ Rp. 90,000.00
0.080 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 m’ list plafond gypsum profil besar
6.9.1 Bahan
1.050 m' List gypsum besar @ Rp. 27,025.00
0.015 kg Serbuk Gypsum @ Rp. 1,437.50
6.9.2 Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Kayu @ Rp. 90,000.00
0.006 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 m’ list plafond gypsum profil
6.9.1 Bahan
1.050 m' List gypsum @ Rp. 24,250.00
0.015 kg Serbuk Gypsum @ Rp. 1,437.50
6.9.2 Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Kayu @ Rp. 90,000.00
0.006 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 Memasang 1 m’ list langit-langit kayu profil
6.9.1 Bahan
1.050 m' List kayu propil @ Rp. 12,900.00
0.010 kg Paku keling 3/4", 5/8", 7/8" @ Rp. 21,200.00
6.9.2 Tenaga Jumlah (I)
0.050 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 langit-langit eternit
Bahan
1.100 m2 Eternite Sakura @ Rp. 16,100.00
0.010 kg Paku triplek @ Rp. 12,075.00
Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan

X. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM


6.1 Memasang 1 kg besi profil siku
6.1.1 Bahan
1.150 kg Besi siku @ Rp. 12,700.00
6.1.2 Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Besi @ Rp. 75,000.00
0.006 OH Kepala Tukang Besi @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 kg baja profil canal
Bahan
1.150 kg Besi canal @ Rp. 16,000.00
Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Besi @ Rp. 75,000.00
0.006 OH Kepala Tukang Besi @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Memasang 1 kg rangka kuda-kuda baja IWF
6.2.1 Bahan
1.150 kg Besi Profil WF @ Rp. 16,900.00
6.2.2 Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Besi @ Rp. 75,000.00
0.006 OH Kepala Tukang Besi @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Mengerjakan 100 kg pekerjaan perakitan
6.3.1 Bahan
1.000 ltr. Solar @ Rp. 8,500.00
0.100 ltr. Minyak pelumas mesran B. 40 @ Rp. 34,000.00
6.3.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang las @ Rp. 80,000.00
0.001 OH Kepala Tukang Las @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
6.3.3 Alat Jumlah (II)
0.008 Jam Sewa alat / pekerjaan las @ Rp. 40,300.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
6.4.1 Bahan
15.000 kg Besi siku @ Rp. 12,700.00
32.800 kg Besi plate @ Rp. 19,300.00
0.050 kg Kawat Las Listrik @ Rp. 30,475.00
6.4.2 Tenaga Jumlah (I)
1.050 OH Pekerja @ Rp. 60,000.00
1.050 OH Tukang las @ Rp. 80,000.00
0.105 OH Kepala Tukang Las @ Rp. 90,000.00
0.052 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Mengerjakan 10 cm pengelasan dengan las listrik
6,5,1 Bahan
0.400 Kg Kawat Las Listrik @ Rp. 30,475.00
0.300 Liter Solar @ Rp. 8,500.00
0.040 Liter Minyak pelumas mesran B. 40 @ Rp. 34,000.00
6,5,2 Tenaga Jumlah (I)
0.040 OH Pekerja @ Rp. 60,000.00
0.020 OH Tukang las @ Rp. 80,000.00
0.002 OH Kepala Tukang Las @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
6,5,3 Alat Jumlah (II)
0.170 Jam Sewa alat / pekerjaan las @ Rp. 40,300.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m kusen pintu alluminium ex YKK
6.11.1 Bahan
1.100 m Kusen Alumunium 4" (YKK) @ Rp. 138,000.00
2.000 buah Paku skrup 1" @ Rp. 150.00
0.060 tube Sealand @ Rp. 32,200.00
6.11.2 Tenaga Jumlah (I)
0.043 OH Pekerja @ Rp. 60,000.00
0.043 OH Tukang Besi @ Rp. 75,000.00
0.0043 OH Kepala Tukang Besi @ Rp. 80,000.00
0.0021 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m kusen pintu alluminium coklat
6.11.1 Bahan
1.100 m Kusen aluminium 4" coklat @ Rp. 123,900.00
2.000 buah Paku skrup 1" @ Rp. 150.00
0.060 tube Sealand @ Rp. 32,200.00
6.11.2 Tenaga Jumlah (I)
0.043 OH Pekerja @ Rp. 60,000.00
0.043 OH Tukang Besi @ Rp. 75,000.00
0.004 OH Kepala Tukang Besi @ Rp. 80,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 Memasang 1 m kusen pintu alluminium perak
6.11.1 Bahan
1.100 m Kusen aluminium 4" perak @ Rp. 113,600.00
2.000 buah Paku skrup 1" @ Rp. 150.00
0.060 tube Sealand @ Rp. 32,200.00
6.11.2 Tenaga Jumlah (I)
0.043 OH Pekerja @ Rp. 60,000.00
0.043 OH Tukang Besi @ Rp. 75,000.00
0.004 OH Kepala Tukang Besi @ Rp. 80,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 Memasang 1 m2 pintu alluminium strip lebar 8 cm
6.12.1 Bahan
4.400 m' Profil Aluminium @ Rp. 104,450.00
14.600 m' Alluminium strip @ Rp. 30,850.00
6.12.2 Tenaga Jumlah (I)
0.085 OH Pekerja @ Rp. 60,000.00
0.085 OH Tukang Besi @ Rp. 75,000.00
0.0085 OH Kepala Tukang Besi @ Rp. 80,000.00
0.0042 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 Memasang 1 m2 Daun pintu kaca rangka alluminium coklat
6.13.1 Bahan
4.400 m' Daun pintu aluminium 8 cm ( kaca 8 mm ) coklat @ Rp. 165,250.00
4.500 m' Profil Kaca @ Rp. 8,050.00
0.270 tube Sealand @ Rp. 32,200.00
6.13.2 Tenaga Jumlah (I)
0.085 OH Pekerja @ Rp. 60,000.00
0.085 OH Tukang Besi @ Rp. 75,000.00
0.009 OH Kepala Tukang Besi @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Memasang 1 m2 Daun pintu kaca rangka alluminium perak
6.13.1 Bahan
4.400 m' Daun pintu aluminium 8 cm ( kaca 8 mm ) perak @ Rp. 154,750.00
4.500 m' Profil Kaca @ Rp. 8,050.00
0.270 tube Sealand @ Rp. 32,200.00
6.13.2 Tenaga Jumlah (I)
0.085 OH Pekerja @ Rp. 60,000.00
0.085 OH Tukang Besi @ Rp. 75,000.00
0.009 OH Kepala Tukang Besi @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 Daun jendela kaca rangka alluminium
Bahan
4.400 m' Profil Aluminium @ Rp. 104,450.00
4.500 m' Profil Kaca @ Rp. 8,050.00
0.270 tube Sealand @ Rp. 32,200.00
Tenaga Jumlah (I)
0.085 OH Pekerja @ Rp. 60,000.00
0.085 OH Tukang Besi @ Rp. 75,000.00
0.009 OH Kepala Tukang Besi @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Memasang 1 m2 terali besi strip (2 x 3) mm
6.15.1 Bahan
6.177 kg Besi plate strip @ Rp. 19,300.00
27.080 cm Pengelasan @ Rp. 2,400.00
6.15.2 Tenaga Jumlah (I)
1.670 OH Pekerja @ Rp. 60,000.00
1.670 OH Tukang Besi @ Rp. 75,000.00
0.167 OH Kepala Tukang Besi @ Rp. 80,000.00
0.083 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.16 Memasang 1 m2 kawat nyamuk
6.16.1 Bahan
1.100 m2 Kawat nyamuk/kawat kasa biasa @ Rp. 20,125.00
11.110 cm Pengelasan @ Rp. 2,400.00
1.716 kg Besi plate strip @ Rp. 19,300.00
6.16.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Besi @ Rp. 75,000.00
0.010 OH Kepala Tukang Besi @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Memasang 1 m2 jendela nako & teralis
6.17.1 Bahan
1.100 m2 Kaca naco @ Rp. 7,550.00
10.000 buah Paku skrup 1" @ Rp. 150.00
7.000 m Besi strip 5/8 x 3 @ Rp. 10,250.00
6.17.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang las @ Rp. 80,000.00
0.020 OH Kepala tukang las @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga seteah dibulatkan
6.18 Memasang 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm
6.18.1 Bahan
1.050 m' Seng BJLs 28/ 0,9 x 1,8 @ Rp. 83,375.00
0.015 kg Paku payung @ Rp. 20,500.00
0.019 m3 Kayu meranti usuk 5/7 @ Rp. 4,887,500.00
6.18.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang las @ Rp. 80,000.00
0.020 OH Kepala tukang las @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.19 Memasang 1 m’ talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
6.19.1 Bahan
1.050 m' Seng BJLs 20/ 45 cm @ Rp. 16,100.00
0.010 kg Paku payung @ Rp. 20,500.00
0.500 kg Besi strip 5/8 x 3 @ Rp. 10,250.00
6.19.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang las @ Rp. 80,000.00
0.030 OH Kepala tukang las @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan

XI. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP


6.1a 1 m2 Pasang atap genteng palentong kecil
6.1a.1 Bahan
25.000 buah Genteng Palentong @ Rp. 2,100.00
6.1a.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Kayu @ Rp. 90,000.00
0.0075 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1b 1 m2 Pasang atap genteng flam press / lokal
6.1b.1 Bahan
25.000 buah Genteng flam pres jawa / lokal @ Rp. 1,250.00
6.1b.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Kayu @ Rp. 90,000.00
0.008 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1c 1 m2 Pasang atap genteng karang pilang / lokal
6.1c.1 Bahan
25.000 buah Genteng karang pilang lokal @ Rp. 1,550.00
6.1c.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Kayu @ Rp. 90,000.00
0.008 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1d 1 M2 Pasang atap genteng karang pilang Bima Ambulu
6.1d.1 Bahan
25.000 buah Genteng karang pilang/ Bima Ambulu @ Rp. 3,350.00
6.1d.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Kayu @ Rp. 90,000.00
0.008 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1d 1 M2 Pasang atap genteng beton
6.1d.1 Bahan
11.000 buah genteng beton @ Rp. 5,250.00
0.030 kg Paku reng 2" @ Rp. 11,875.00
6.1d.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1d 1 M2 Pasang atap genteng Zincalume
6.1d.1 Bahan
1.050 m2 Genteng Zincalume 0.3 mm @ Rp. 94,875.00
0.200 kg Paku skrup 0,5" @ Rp. 8,500.00
6.1d.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Kayu @ Rp. 90,000.00
0.080 OH Kepala Tukang kayu @ Rp. 90,000.00
0.006 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1d 1 M2 Pasang atap genteng metal roof
6.1d.1 Bahan
1.020 m2 Genteng Metal Roof 0.3 mm @ Rp. 97,750.00
0.200 doz Paku skrup 0,5" @ Rp. 8,500.00
6.1d.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1d 1 M2 Pasang atap genteng metal roof + insulin
6.1d.1 Bahan
1.020 m2 Genteng Metal Roof + Insulin @ Rp. 92,000.00
0.200 doz Paku skrup 0,5" @ Rp. 8,500.00
6.1d.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 M2 Pasang Genteng metal ukuran 80 x 100 atap pelana
6.1d.1 Bahan
1.300 Bh Genteng metal @ Rp. #N/A
0.200 Kg Paku skrup 0,5" @ Rp. 8,500.00
6.1d.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 M2 Pasang Genteng metal ukuran 80 x 100 atap jurai
6.1d.1 Bahan
2.000 Bh Genteng metal @ Rp. #N/A
0.200 Kg Paku skrup 0,5" @ Rp. 8,500.00
6.1d.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 M2 Pasang atap sirap kayu
6.1d.1 Bahan
30.000 Bh Sirap kayu @ Rp. #N/A
0.200 Kg Paku skrup 0,5" @ Rp. 8,500.00
6.1d.2 Tenaga Jumlah (I)
0.166 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Kayu @ Rp. 90,000.00
0.025 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4a 1 M' Pasang genteng bubung palentong
6.4a.1 Bahan
5.000 buah Genteng Nok Palentong @ Rp. 10,600.00
8.000 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6.4a.2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4b 1 M' Pasang genteng bubung flam press
6.4b.1 Bahan
5.000 buah Genteng Wuwung Flam Pres Lokal @ Rp. 3,450.00
8.000 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6.4b.2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4c 1 M' Pasang genteng bubung karang pilang / lokal
6.4c.1 Bahan
5.000 lembar Genteng Wuwung karangpilang lokal @ Rp. 6,800.00
8.000 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6.4c.2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4d 1 M' Pasang genteng bubung karang pilang Bima Ambulu
6.4d.1 Bahan
5.000 buah Genteng Wuwung Karangpilang/ Bima Ambulu @ Rp. 7,450.00
8.000 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6.4d.2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 M' Pasang genteng bubung beton
Bahan
3.500 buah Nok Genteng Beton @ Rp. 11,500.00
0.050 kg Paku skrup @ Rp. 20,125.00
10.800 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
1.000 kg Semen Warna @ Rp. 12,650.00
Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4d 1 M' Pasang genteng bubung samping Zincalume/Metal Roof
6.4d.1 Bahan
1.100 m' Nok Samping Metal Roof @ Rp. 33,350.00
0.050 doz Paku skrup 0,5" @ Rp. 8,500.00
6.4d.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 1 m2 Pasang atap asbes gelombang kecil 4 mm
6.11.1 Bahan
0.350 lembar Asbes gelombang kecil tebal 4 mm (3,05 x 1,05) @ Rp. 78,850.00
0.120 kg Paku pancing @ Rp. 22,350.00
6.11.2 Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11a 1 m2 Pasang atap asbes gelombang 0,92 m x 2,5 m x 5 mm
6.11a.1 Bahan
0.35 0.500 lembar Asbes gelombang besar tebal 5 mm @ Rp. 126,500.00
0.120 kg Paku pancing @ Rp. 22,350.00
6.11a.2 Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.07 0.075 OH Tukang Kayu @ Rp. 90,000.00
0.007 0.008 OH Kepala Tukang kayu @ Rp. 90,000.00
0.007 0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 1 m' Pasang nok stel gelombang 1,05 m
6.23.1 Bahan
2.100 lembar Nok stel gelombang @ Rp. 17,100.00
6.000 buah Paku asbes @ Rp. 500.00
6.23.2 Tenaga Jumlah (I)
0.084 OH Pekerja @ Rp. 60,000.00
0.125 OH Tukang Kayu @ Rp. 90,000.00
0.013 OH Kepala Tukang kayu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.38 1 m2 Pasang atap seng gelombang
6.38.1 Bahan
0.700 lembar Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
0.020 kg Paku payung @ Rp. 20,500.00
6.38.2 Tenaga Jumlah (I)
0.120 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Kayu @ Rp. 90,000.00
0.006 OH Kepala Tukang kayu @ Rp. 90,000.00
0.006 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.39 1 m' Pasang atap nok seng
6.39.1 Bahan
0.300 lembar Seng BJLs 30/ 60 cm @ Rp. 28,750.00
0.040 kg Paku payung @ Rp. 20,500.00
6.39.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.008 0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.006 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Pasang nok genteng beton
6.39.1 Bahan
3.500 buah Nok genteng beton @ Rp. 11,500.00
0.050 kg Paku payung @ Rp. 20,500.00
10.800 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
1.000 kg Semen Warna @ Rp. 12,650.00
6.39.2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.020 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Pasang nok genteng metal / zincalume
6.39.1 Bahan
1.100 buah Nok Genteng Metal Roof @ Rp. 31,050.00
0.500 kg Paku payung @ Rp. 20,500.00
6.39.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pasang atap PolyCarbonate 5 mm
Bahan
1.050 m2 Polycarbonat 5 mm @ Rp. 110,000.00
0.120 kg Paku payung @ Rp. 20,500.00
Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.067 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pasang atap PolyCarbonate 10 mm
Bahan
1.050 m2 Polycarbonat 10 mm @ Rp. 160,000.00
0.120 kg Paku payung @ Rp. 20,500.00
Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.067 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pasang atap Solartuff / roof light fiberglass 90 x 180
Bahan
1,05 m2 0.600 lembar Solartuf @ Rp. 486,000.00
0.050 kg Paku payung @ Rp. 20,500.00
Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.067 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
XII. ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI
6.1 Memasang 1 buah kloset duduk / monoblok
6.1.1 Bahan
1.000 buah Klosed duduk putih porselen komplit @ Rp. 1,380,000.00
6% x harga kloset Perlengkapan @ Rp. 82,800.00
6.1.2 Tenaga Jumlah (I)
3.300 OH Pekerja @ Rp. 60,000.00
1.100 OH Tukang Pipa @ Rp. 70,000.00
0.001 0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.160 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1 Memasang 1 buah kloset duduk / monoblok Ex TOTO
6.1.1 Bahan
1.000 buah Klosed Duduk @ Rp. 2,518,500.00
6% x harga kloset Perlengkapan @ Rp. 151,110.00
6.1.2 Tenaga Jumlah (I)
3.300 OH Pekerja @ Rp. 60,000.00
1.100 OH Tukang Pipa @ Rp. 70,000.00
0.001 0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.160 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Memasang 1 buah kloset jongkok porselen
6.2.1 Bahan
1.000 buah Klosed jongkok porselen warna putih @ Rp. 116,550.00
6.000 kg Semen PC @ Rp. 1,370.00
0.010 m3 Pasir pasang @ Rp. 185,000.00
6.2.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
1.500 OH Tukang Pipa @ Rp. 70,000.00
0.150 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.160 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Memasang 1 buah urinoir
6.4.1 Bahan
1.000 buah Urinoir @ Rp. 1,725,000.00
30% x harga urinoir Perlengkapan @ Rp. 517,500.00
6.000 kg Semen PC @ Rp. 1,370.00
0.010 m3 Pasir pasang @ Rp. 185,000.00
6.4.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
1.000 OH Tukang Pipa @ Rp. 70,000.00
0.100 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Memasang 1 buah urinoir ex TOTO
6.4.1 Bahan
1.000 buah Urinoir Toto @ Rp. 3,680,000.00
30% x harga urinoir Perlengkapan @ Rp. 1,104,000.00
6.000 kg Semen PC @ Rp. 1,370.00
0.010 m3 Pasir pasang @ Rp. 185,000.00
6.4.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
1.000 OH Tukang Pipa @ Rp. 70,000.00
0.100 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Memasang 1 buah wastafel
6.5.1 Bahan
1 bh 1.200 buah Wastafel keramik (Ina) muda @ Rp. 502,000.00
12% x harga WastafelPerlengkapan @ Rp. 150,600.00
6.000 kg Semen PC @ Rp. 1,370.00
0.010 m3 Pasir pasang @ Rp. 185,000.00
6.5.2 Tenaga Jumlah (I)
1.200 OH Pekerja @ Rp. 60,000.00
1.450 OH Tukang Pipa @ Rp. 70,000.00
0.150 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.060 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 buah bak air fiberglass vol 1 m3
6.8.1 Bahan
1.000 bh Bak air (tandon) Fibre kapasitas 550 m3 @ Rp. 770,500.00
12% x harga tandon Perlengkapan @ Rp. 92,460.00

6.8.2 Tenaga Jumlah (I)


0.300 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 buah bak mandi batu bata volume 0,30 m3
6.8.1 Bahan
150.000 bh Batu bata merah @ Rp. 750.00
120.000 kg Semen PC @ Rp. 1,370.00
0.300 m3 Pasir pasang @ Rp. 185,000.00
360.000 buah Tegel porselen 11 x 11 cm @ Rp. 542.22
6.000 kg Semen Warna @ Rp. 12,650.00
6.8.2 Tenaga Jumlah (I)
6.000 OH Pekerja @ Rp. 60,000.00
3.000 OH Tukang Batu @ Rp. 70,000.00
0.300 OH Kepala Tukang Batu @ Rp. 90,000.00
0.30 0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 buah bak cuci piring stainlessteel
6.8.1 Bahan
1.000 unit Bak cuci piring logam 100 @ Rp. 287,500.00
1.000 bh Afour @ Rp. 38,600.00
6.8.2 Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang Batu @ Rp. 70,000.00
0.030 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14a Memasang 1 m' pipa beton, dia. 15 cm
6.14a.1 Bahan
1.100 buah Buis beton diameter 15 cm @ Rp. 23,400.00
0.027 m3 Batu bata merah @ Rp. 372,023.81
3.920 kg Semen PC @ Rp. 1,370.00
0.056 m3 Pasir pasang @ Rp. 185,000.00
0.024 m3 Pasir urug @ Rp. 3,750.00
6.14a.2 Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Batu @ Rp. 70,000.00
0.007 OH Kepala Tukang Batu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14b Memasang 1 m' pipa beton, dia. 20 cm
6.14b.1 Bahan
1.100 buah Buis beton diameter 20 cm @ Rp. 33,900.00
0.027 m3 Batu bata merah @ Rp. 372,023.81
3.920 kg Semen PC @ Rp. 1,370.00
0.056 m3 Pasir pasang @ Rp. 185,000.00
0.024 m3 Pasir urug @ Rp. 3,750.00
6.14b.2 Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Batu @ Rp. 70,000.00
0.007 OH Kepala Tukang Batu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15a Memasang 1 m' pipa beton, dia. 30 cm
6.15a.1 Bahan
1.100 buah Buis beton diameter 30 cm @ Rp. 42,500.00
0.550 m3 Batu bata merah @ Rp. 372,023.81
10.300 kg Semen PC @ Rp. 1,370.00
0.061 m3 Pasir pasang @ Rp. 185,000.00
0.069 m3 Pasir urug @ Rp. 3,750.00
6.15a.2 Tenaga Jumlah (I)
0.380 OH Pekerja @ Rp. 60,000.00
0.190 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.019 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15b Memasang 1 m' pipa beton, dia. 40 cm
6.15b.1 Bahan
1.100 buah Buis beton diameter 40 cm @ Rp. 46,600.00
0.550 m3 Batu bata merah @ Rp. 372,023.81
10.300 kg Semen PC @ Rp. 1,370.00
0.061 m3 Pasir pasang @ Rp. 185,000.00
0.069 m3 Pasir urug @ Rp. 3,750.00
6.15b.2 Tenaga Jumlah (I)
0.380 OH Pekerja @ Rp. 60,000.00
0.190 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.019 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15c Memasang 1 m' pipa beton, dia. 50 cm
6.15c.1 Bahan
1.100 buah Buis beton diameter 50 cm @ Rp. 57,300.00
0.550 m3 Batu bata merah @ Rp. 372,023.81
10.300 kg Semen PC @ Rp. 1,370.00
0.061 m3 Pasir pasang @ Rp. 185,000.00
0.069 m3 Pasir urug @ Rp. 3,750.00
6.15c.2 Tenaga Jumlah (I)
0.380 OH Pekerja @ Rp. 60,000.00
0.190 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.019 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.16 Memasang 1 buah bak kontrol pasangan batu bata uk. (30x30) cm, tinggi 35 cm
6.16.1 Bahan
40.000 bh Batu bata merah @ Rp. 750.00
44.000 kg Semen PC @ Rp. 1,370.00
0.070 m3 Pasir pasang @ Rp. 185,000.00
0.070 m3 Batu pecah 3 - 5 @ Rp. 260,000.00
1.600 kg Besi beton polos @ Rp. 10,000.00
0.060 m3 Pasir beton @ Rp. 5,000.00
6.16.2 Tenaga Jumlah (I)
2.160 OH Pekerja @ Rp. 60,000.00
0.720 OH Tukang Batu @ Rp. 70,000.00
0.072 OH Kepala Tukang Batu @ Rp. 90,000.00
0.011 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Memasang 1 buah bak kontrol pasangan batu bata uk. (45 x 45) cm, tinggi 50 cm
6.17.1 Bahan
70.000 bh Batu bata merah @ Rp. 750.00
77.000 kg Semen PC @ Rp. 1,370.00
0.130 m3 Pasir pasang @ Rp. 185,000.00
0.020 m3 Batu pecah 3 - 5 @ Rp. 260,000.00
2.600 kg Besi beton polos @ Rp. 10,000.00
0.090 m3 Pasir beton @ Rp. 5,000.00
6.17.2 Tenaga Jumlah (I)
3.200 OH Pekerja @ Rp. 60,000.00
1.150 OH Tukang Batu @ Rp. 70,000.00
0.011 OH Kepala Tukang Batu @ Rp. 90,000.00
0.016 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.18 Memasang 1 buah bak kontrol pasangan batu bata uk. (60 x 60) cm, tinggi 65 cm
6.18.1 Bahan
123.000 bh Batu bata merah @ Rp. 750.00
114.000 kg Semen PC @ Rp. 1,370.00
0.184 m3 Pasir pasang @ Rp. 185,000.00
0.033 m3 Batu pecah 3 - 5 @ Rp. 260,000.00
4.850 kg Besi beton polos @ Rp. 10,000.00
0.120 m3 Pasir beton @ Rp. 5,000.00
6.18.2 Tenaga Jumlah (I)
3.200 OH Pekerja @ Rp. 60,000.00
1.150 OH Tukang Batu @ Rp. 70,000.00
0.011 OH Kepala Tukang Batu @ Rp. 90,000.00
0.016 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.19 Memasang 1 m' pipa galvanis dia. 1/2"
6.19.1 Bahan
1.200 m' Pipa Air Gl Ø 1/2" @ Rp. 21,875.00
35% x harga pipa Perlengkapan @ Rp. 7,656.25
6.19.2 Tenaga Jumlah (I)
0.054 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Pipa @ Rp. 70,000.00
0.009 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.027 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.20 Memasang 1 m' pipa galvanis dia. 3/4"
6.20.1 Bahan
1.200 m' Pipa Air Gl Ø 3/4" @ Rp. 26,225.00
35% x harga pipa Perlengkapan @ Rp. 9,178.75
6.20.2 Tenaga Jumlah (I)
0.054 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Pipa @ Rp. 70,000.00
0.009 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.027 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.21 Memasang 1 m' pipa galvanis dia. 1"
6.21.1 Bahan
1.200 m' Pipa Air Gl Ø 1" @ Rp. 39,375.00
35% x harga pipa Perlengkapan @ Rp. 13,781.25
6.21.2 Tenaga Jumlah (I)
0.054 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Pipa @ Rp. 70,000.00
0.009 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.027 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22 Memasang 1 m' pipa galvanis dia. 2"
6.22.1 Bahan
1.200 m' Pipa Air Gl Ø 2" @ Rp. 85,991.67
35% x harga pipa Perlengkapan @ Rp. 30,097.08
6.22.2 Tenaga Jumlah (I)
0.108 OH Pekerja @ Rp. 60,000.00
0.180 OH Tukang Pipa @ Rp. 70,000.00
0.018 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m' pipa galvanis dia. 1,5"
6.22.1 Bahan
1.200 m' Pipa Air Gl Ø 1 1/2" @ Rp. 58,308.33
35% x harga pipa Perlengkapan @ Rp. 20,407.92
6.22.2 Tenaga Jumlah (I)
0.108 OH Pekerja @ Rp. 60,000.00
0.180 OH Tukang Pipa @ Rp. 70,000.00
0.018 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m' pipa galvanis dia. 3"
6.23.1 Bahan
1.200 m' Pipa Air Gl Ø 3" @ Rp. 141,043.33
35% x harga pipa Perlengkapan @ Rp. 49,365.17
6.23.2 Tenaga Jumlah (I)
0.135 OH Pekerja @ Rp. 60,000.00
0.225 OH Tukang Pipa @ Rp. 70,000.00
0.023 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m' pipa galvanis dia. 4"
6.24.1 Bahan
1.200 m' Pipa Air Gl Ø 4" @ Rp. 206,438.33
35% x harga pipa Perlengkapan @ Rp. 72,253.42
6.24.2 Tenaga Jumlah (I)
0.135 OH Pekerja @ Rp. 60,000.00
0.225 OH Tukang Pipa @ Rp. 70,000.00
0.023 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m' pipa PVC tipe AW dia. 1/2"
6.25.1 Bahan
1.200 m' Pipa PVC 1/2" AW @ Rp. 7,187.50
35% x harga pipa Perlengkapan @ Rp. 2,515.63
6.25.2 Tenaga Jumlah (I)
0.036 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Pipa @ Rp. 70,000.00
0.006 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.26 Memasang 1 m' pipa PVC tipe AW dia. 3/4"
6.26.1 Bahan
1.200 m' Pipa PVC 3/4" AW @ Rp. 9,100.00
35% x harga pipa Perlengkapan @ Rp. 3,185.00
6.26.2 Tenaga Jumlah (I)
0.036 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Pipa @ Rp. 70,000.00
0.006 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.27 Memasang 1 m' pipa PVC tipe AW dia. 1"
6.27.1 Bahan
1.200 m' Pipa PVC 1" AW @ Rp. 11,308.33
35% x harga pipa Perlengkapan @ Rp. 3,957.92
6.27.2 Tenaga Jumlah (I)
0.036 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Pipa @ Rp. 70,000.00
0.006 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m' pipa PVC tipe AW dia. 1,5"
6.27.1 Bahan
1.200 m' Pipa PVC 1 1/2" AW @ Rp. 20,968.33
35% x harga pipa Perlengkapan @ Rp. 7,338.92
6.27.2 Tenaga Jumlah (I)
0.054 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Pipa @ Rp. 70,000.00
0.009 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.28 Memasang 1 m' pipa PVC tipe AW dia. 2"
6.28.1 Bahan
1.200 m' Pipa PVC 2" AW @ Rp. 31,050.00
35% x harga pipa Perlengkapan @ Rp. 10,867.50
6.28.2 Tenaga Jumlah (I)
0.054 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Pipa @ Rp. 70,000.00
0.009 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m' pipa PVC tipe AW dia. 3"
Bahan
1.200 m' Pipa PVC 3" AW @ Rp. 57,250.83
35% x harga pipa Perlengkapan @ Rp. 20,037.79
Tenaga Jumlah (I)
0.081 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Pipa @ Rp. 70,000.00
0.0135 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.29 Memasang 1 m' pipa PVC tipe AW dia. 4"
6.29.1 Bahan
1.200 m' Pipa PVC 4" AW @ Rp. 83,758.33
35% x harga pipa Perlengkapan @ Rp. 29,315.42
6.29.2 Tenaga Jumlah (I)
0.081 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Pipa @ Rp. 70,000.00
0.0135 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.30 Memasang 1 m' pipa PVC tipe AW dia. 6"
6.30.1 Bahan
1.200 m' Pipa PVC 6" AW @ Rp. 169,050.00
35% x harga pipa Perlengkapan @ Rp. 59,167.50
6.30.2 Tenaga Jumlah (I)
0.081 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Pipa @ Rp. 70,000.00
0.014 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.31 Memasang 1 m' pipa PVC tipe AW dia. 8"
6.31.1 Bahan
1.200 m' Pipa PVC 8" AW @ Rp. 257,000.00
35% x harga pipa Perlengkapan @ Rp. 89,950.00
6.31.2 Tenaga Jumlah (I)
0.081 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Pipa @ Rp. 70,000.00
0.014 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.32 Memasang 1 m' pipa PVC tipe AW dia. 10"
6.32.1 Bahan
1.200 m' Pipa PVC 10" AW @ Rp. 356,500.00
35% x harga pipa Perlengkapan @ Rp. 124,775.00
6.32.2 Tenaga Jumlah (I)
0.081 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Pipa @ Rp. 70,000.00
0.014 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Memasang 1 buah kran biasa diameter 1/2"
6.35.1 Bahan
1.000 buah Kran biasa @ Rp. 21,500.00
0.025 buah Seal Tape @ Rp. 2,700.00
6.35.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 0.400 OH Tukang Pipa @ Rp. 70,000.00
0.010 0.040 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Memasang 1 buah kran biasa diameter 3/4"
6.35.1 Bahan
1.000 buah Kran air 3/4" @ Rp. 22,050.00
0.025 buah Seal Tape @ Rp. 2,700.00
6.35.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 0.400 OH Tukang Pipa @ Rp. 70,000.00
0.010 0.040 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Memasang 1 buah kran
6.35.1 Bahan
1.000 buah Kran Sedang @ Rp. 52,350.00
0.025 buah Seal Tape @ Rp. 2,700.00
6.35.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Pipa @ Rp. 70,000.00
0.040 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Memasang 1 buah kran wastafel
6.35.1 Bahan
1.000 buah Kran Wastafel @ Rp. 56,250.00
0.025 buah Seal Tape @ Rp. 2,700.00
6.35.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Pipa @ Rp. 70,000.00
0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Memasang 1 buah kran leher angsa
6.35.1 Bahan
1.000 buah Kran Leher Angsa @ Rp. 92,000.00
0.025 buah Paku asbes @ Rp. 500.00
6.35.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Pipa @ Rp. 70,000.00
0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.36 Memasang 1 buah floor drain
6.36.1 Bahan
1.000 buah Floor drain @ Rp. 175,375.00
6.36.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Pipa @ Rp. 70,000.00
0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 buah Shower Kloset
Bahan
1.000 buah Shower kloset biasa @ Rp. 85,000.00
0.025 buah Seal Tape @ Rp. 2,700.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Pipa @ Rp. 70,000.00
0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 buah Shower Kamar Mandi
Bahan
1.000 buah Hand Shower @ Rp. 143,750.00
0.025 buah Seal Tape @ Rp. 2,700.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Pipa @ Rp. 70,000.00
0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 buah Bak Cuci
Bahan
1.000 buah Bak cuci piring logam 100 @ Rp. 287,500.00
1.000 buah Afour @ Rp. 38,600.00
Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang Pipa @ Rp. 70,000.00
0.030 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan

XIII. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA


6.2 1 buah Pasang kunci tanam biasa
6.2.1 Bahan
1.000 buah Kunci tanam (808) @ Rp. 51,000.00
6.2.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang kunci silinder
6.2.1 Bahan
1.000 buah Kunci silinder @ Rp. 57,500.00
6.2.2 Tenaga Jumlah (I)
0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang kunci tanam Alumunium
Bahan
1.000 buah Kunci pintu Aluminium @ Rp. 66,125.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 1 buah Pasang kunci kamar mandi
6.3.1 Bahan
1.000 buah Kunci tanam kamar mandi @ Rp. 49,450.00
6.3.2 Tenaga Jumlah (I)
0.05 0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 1 buah Pasang kunci pintu
6.4.1 Bahan
1.000 buah Kunci 2 x putar @ Rp. 186,875.00
6.4.2 Tenaga Jumlah (I)
0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 set Pasang floor hinge
Bahan
1.000 set Floor Hinge @ Rp. 1,700,000.00
Tenaga Jumlah (I)
0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.000 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 set Pasang Shower Hinge
Bahan
1.000 set Shower Hinge @ Rp. 700,000.00
Tenaga Jumlah (I)
0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.000 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 bh Pasang Patch Fitting
Bahan
1.000 bh Patch Fitting @ Rp. 550,000.00
Tenaga Jumlah (I)
0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.000 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 buah Pasang casement handle
6.5.1 Bahan
1.000 buah Casement Handel @ Rp. 33,500.00
6.5.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 buah Pasang engsel pintu
6.5.1 Bahan
1.000 buah Engsel pintu @ Rp. 20,000.00
6.5.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang engsel angin
6.5.1 Bahan
1.000 buah Engsel angin @ Rp. 15,525.00
6.5.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 buah Pasang engsel pintu alumunium
6.5.1 Bahan
1.000 buah Engsel pintu Aluminium biasa @ Rp. 51,650.00
6.5.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 1 buah Pasang engsel jendela kupu-kupu
6.6.1 Bahan
1.000 buah Engsel jendela @ Rp. 15,850.00
6.6.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang engsel jendela alumunium
Bahan
1.000 buah Engsel jendela Aluminium stenlees @ Rp. 23,575.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang grendel tanam
Bahan
1.000 buah Grendel tanam @ Rp. 12,937.50
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang grendel jendela / spring knip
Bahan
1.000 buah Grendel Jendela @ Rp. 18,975.00
Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang grendel alumunium
Bahan
1.000 buah Grendel jendela Aluminium biasa @ Rp. 24,725.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang Espanyolet
Bahan
1.000 buah Espanyolet @ Rp. 26,650.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 1 buah Pasang kait/hak angin
6.9.1 Bahan
1.000 buah Hak angin 44 mm (lurus) @ Rp. 10,000.00
6.9.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 1 buah Pasang door closer
6.10.1 Bahan
1.000 set Door Closer @ Rp. 172,500.00
6.10.2 Tenaga Jumlah (I)
0.050 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 1 buah Pasang kunci selot
6.11.1 Bahan
1.000 buah Kunci selot @ Rp. 66,125.00
6.11.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 1 buah Pasang pegangan pintu / door holder
6.12.1 Bahan
1.000 buah Door Holder @ Rp. 46,000.00
6.12.2 Tenaga Jumlah (I)
0.050 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 1 buah Pasang door stop
6.13.1 Bahan
1.000 buah Door Stop @ Rp. 51,750.00
6.13.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17a 1 m2 pasang kaca, tebal 5 mm
6.17a.1 Bahan
1.100 m2 Kaca polos tebal 5 mm @ Rp. 86,050.00
6.17a.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17a 1 m2 pasang kaca, tebal 5 mm + Sealant
6.17a.1 Bahan
1.100 m2 Kaca polos tebal 5 mm @ Rp. 86,050.00
0.050 tube Sealand @ Rp. 32,200.00
6.17a.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17b 1 m2 pasang kaca rayban, tebal 5 mm
6.17b.1 Bahan
1.100 m2 Kaca rayban tebal 5 mm @ Rp. 108,175.00
6.17b.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17c 1 m2 pasang kaca cermin, tebal 5 mm
6.17b.1 Bahan
1.100 m2 Kaca Cermin tb. 5 mm @ Rp. 105,000.00
6.17b.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0008 0.0080 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17e 1 m2 pasang kaca tempered, tebal 12 mm
6.17b.1 Bahan
1.100 m2 Kaca Flat Tempered 12mm @ Rp. 1,425,000.00
6.17b.2 Tenaga Jumlah (I)
0.025 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Kayu @ Rp. 90,000.00
0.025 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan

XIV. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN


6.7 1 m2 Pengikisan/Pengerokan Permukaan Cat lama
6.7.1 Bahan
0.050 kg Soda api @ Rp. 26,750.00
6.7.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 1 m2 Pengecatan bidang kayu lama
6.7.1 Bahan
0.150 kg Plamur kayu @ Rp. 28,750.00
0.170 kg Cat dasar @ Rp. 60,260.00
0.170 kg Cat kayu, besi merk Emco STD @ Rp. 60,260.00
6.7.2 Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Cat @ Rp. 75,000.00
0.008 OH Kepala Tukang Cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
6.8.1 Bahan
0.200 kg Cat menie (besi/kayu) sejenis cap Pedang @ Rp. 38,180.00
0.150 kg Plamur kayu @ Rp. 28,750.00
0.170 kg Cat dasar @ Rp. 60,260.00
0.260 kg Cat Kayu @ Rp. 60,260.00
0.010 bh Kuas Uk 4" @ Rp. 19,300.00
0.030 kg Thinner @ Rp. 21,000.00
0.200 lbr Amplas @ Rp. 5,350.00
6.8.2 Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.009 OH Tukang Cat @ Rp. 75,000.00
0.006 OH Kepala Tukang Cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9.1 Bahan
0.200 kg Cat menie (besi/kayu) sejenis cap Pedang @ Rp. 38,180.00
0.150 kg Plamir @ Rp. 28,750.00
0.170 kg Cat dasar @ Rp. 60,260.00
0.350 kg Cat penutup 2 kali @ Rp. 60,260.00
0.010 bh Kuas Uk 4" @ Rp. 19,300.00
0.030 kg Thinner @ Rp. 21,000.00
0.200 lbr Amplas @ Rp. 5,350.00
6.9.2 Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.105 OH Tukang Cat @ Rp. 75,000.00
0.004 OH Kepala Tukang Cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 1 m2 Pelaburan bidang kayu dengan politur
6.11.1 Bahan
0.150 ltr. Politur @ Rp. 77,050.00
0.372 ltr. Politur @ Rp. 77,050.00
2.000 lbr Amplas @ Rp. 5,350.00
6.11.2 Tenaga Jumlah (I)
0.040 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Cat @ Rp. 75,000.00
0.016 OH Kepala Tukang Cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 1 m2 Pelaburan bidang kayu dengan vernis
6.13.1 Bahan
0.150 ltr. Vernis @ Rp. 66,125.00
0.050 kg Dempul @ Rp. 28,750.00
0.100 lembar Amplas @ Rp. 5,350.00
6.13.2 Tenaga Jumlah (I)
0.160 OH Pekerja @ Rp. 60,000.00
0.160 OH Tukang cat @ Rp. 75,000.00
0.016 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat tembok Vinilek, Aviapaint (sejenis) @ Rp. 50,600.00
0.260 kg Cat penutup 2x @ Rp. 50,600.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.0063 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok Interior (mowilex) @ Rp. 42,000.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok interior (mowilex) Standart @ Rp. 63,050.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok interior (mowilex) VIP @ Rp. 65,800.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok interior (mowilex) Pastel @ Rp. 64,400.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok interior (mowilex) Khusus @ Rp. 92,000.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok interior (mowilex) mesin @ Rp. 115,000.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/exterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok Eksterior (Pentalux) @ Rp. 69,900.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/exterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok eksterior (mowilex) @ Rp. 102,600.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/exterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok eksterior (mowilex) mesin @ Rp. 138,000.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
6.15.1 Bahan
0.120 kg Cat dasar @ Rp. 50,600.00
0.180 kg Cat penutup 2x @ Rp. 50,600.00
6.15.2 Tenaga Jumlah (I)
0.028 OH Pekerja @ Rp. 60,000.00
0.042 OH Tukang cat @ Rp. 75,000.00
0.0042 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 1 m2 Pengecatan tembok lama/interior (1 lapis cat dasar, 2 lapis cat penutup)
6.15.1 Bahan
0.120 kg Cat dasar @ Rp. 50,600.00
0.180 kg Cat tembok Interior (mowilex) @ Rp. 42,000.00
6.15.2 Tenaga Jumlah (I)
0.028 OH Pekerja @ Rp. 60,000.00
0.042 OH Tukang cat @ Rp. 75,000.00
0.004 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 1 m2 Pengecatan tembok lama/exterior (1 lapis cat dasar, 2 lapis cat penutup)
6.15.1 Bahan
0.120 kg Cat dasar @ Rp. 50,600.00
0.180 kg Cat tembok Eksterior (Pentalux) @ Rp. 69,900.00
6.15.2 Tenaga Jumlah (I)
0.028 OH Pekerja @ Rp. 60,000.00
0.042 OH Tukang cat @ Rp. 75,000.00
0.004 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 1 m2 Pengecatan permukaan baja dengan meni besi
6,20,1 Bahan
0.100 kg Cat menie (besi/kayu) sejenis cap Pedang @ Rp. 38,180.00
0.010 bh Kuas Uk 4" @ Rp. 19,300.00
6,20,2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang cat @ Rp. 75,000.00
0.020 OH Kepala tukang cat @ Rp. 85,000.00
0.0025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 1 m2 Pengecatan permukaan baja dengan bronze
6,20,1 Bahan
0.100 kg bronze @ Rp. 53,750.00
0.010 bh Kuas Uk 4" @ Rp. 19,300.00
6,20,2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang cat @ Rp. 75,000.00
0.020 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pengecatan tembok weathercoat - putih
Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 ltr Cat Tembok Weather Coat - putih @ Rp. 70,500.00
0.200 ltr Cat penutup 2x @ Rp. 70,500.00
Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pengecatan tembok weathercoat - warna
Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 ltr Cat Tembok Weather Coat - putih @ Rp. 100,000.00
0.200 ltr Cat penutup 2x @ Rp. 100,000.00
Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan

XV.ANALISA BIAYA KONSTRUKSI PEKERJAAN PAVING


1 m2 pasang paving block K300, t=6 cm
Bahan
44.00 1.010 m2 Paving 21.0 x 10.5 x 6.0 mutu K 300 @ Rp. 63,000.00
0.120 0.050 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.500 0.250 OH Pekerja @ Rp. 60,000.00
0.250 0.500 OH Tukang Batu @ Rp. 70,000.00
0.025 0.050 OH Kepala Tukang Batu @ Rp. 90,000.00
0.025 0.0013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 pasang paving block K200, t=6 cm Warna
Bahan
44.00 1.010 m2 Paving 21.0 x 10.5 x 6.0 mutu K 200 warna @ Rp. 76,700.00
0.12 0.050 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.50 0.250 OH Pekerja @ Rp. 60,000.00
0.25 0.500 OH Tukang Batu @ Rp. 70,000.00
0.03 0.050 OH Kepala Tukang Batu @ Rp. 90,000.00
0.03 0.0013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 pasang paving segi enam K300, t=6 cm
Bahan
25.000 bj Paving stone segi enam 6 cm halus @ Rp. 1,864.00
0.050 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 pasang paving motif/grass K300, t=6 cm
Bahan
25.000 bj Paving Stoen motif K300 @ Rp. 2,658.00
0.050 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 pasang grass blok K300, t=6 cm
Bahan
5.250 bj Grass Block @ Rp. 29,560.00
0.050 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pasang Uskup tbl 6cm
Bahan
25.000 buah Uskup Tbl 6.0 mutu K 300 @ Rp. 4,900.00
0.12 0.050 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Pasang Kanstin (10x20x40 cm)
Bahan
2.400 buah Kanstin 40 x 20 x 10 K 300 @ Rp. 21,800.00
0.0126 0.005 m3 Pasir urug @ Rp. 150,000.00
0.005 2.000 kg Semen PC @ Rp. 1,370.00
Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.020 OH Tukang Batu @ Rp. 70,000.00
0.002 OH Kepala Tukang Batu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1m' Saluran U-Ditch 30x40 cm
Bahan
0.833 bh U Ditch 30.40.120 @ Rp. 419,750.00
Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.146 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.058 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran U-Ditch 40x50 cm
Bahan
0.833 bh U Ditch 40.50.120 @ Rp. 547,592.00
Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.146 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.058 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran U-Ditch 50x60 cm
Bahan
0.833 bh U Ditch 50.60.120 @ Rp. 763,792.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.167 OH Tukang Batu @ Rp. 70,000.00
0.167 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.146 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.058 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran U-Ditch 60x80 cm
Bahan
0.833 bh U Ditch 60.80.120 @ Rp. 1,106,300.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.167 OH Tukang Batu @ Rp. 70,000.00
0.167 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.100 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.040 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran U-Ditch 80x100 cm
Bahan
0.833 bh U Ditch 80.100.120 @ Rp. 1,569,750.00
Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.146 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.040 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran U-Ditch 100x120 cm
Bahan
0.833 bh U Ditch 100.100.120.10 cm @ Rp. 1,765,250.00
Tenaga Jumlah (I)
0.667 OH Pekerja @ Rp. 60,000.00
0.167 OH Tukang Batu @ Rp. 70,000.00
0.167 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.146 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.062 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran U-Ditch 120x150 cm
Bahan
0.833 bh U Ditch 120.150.120 @ Rp. 3,064,750.00
Tenaga Jumlah (I)
0.667 OH Pekerja @ Rp. 60,000.00
0.167 OH Tukang Batu @ Rp. 70,000.00
0.167 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.146 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.062 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran U-Ditch 150x150 cm
Bahan
0.833 bh U Ditch 150.150.120 @ Rp. 4,186,000.00
Tenaga Jumlah (I)
0.667 OH Pekerja @ Rp. 60,000.00
0.167 OH Tukang Batu @ Rp. 70,000.00
0.167 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.345 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.062 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran Box Culvert 60/60 cm HD
Bahan
0.833 bh Box Culvert @ Rp. 1,221,000.00
Tenaga Jumlah (I)
0.667 OH Pekerja @ Rp. 60,000.00
0.167 OH Tukang Batu @ Rp. 70,000.00
0.167 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.422 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.040 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran Box Culvert 80/80 cm HD
Bahan
0.833 bh Box Culvert @ Rp. 2,894,550.00
Tenaga Jumlah (I)
0.667 OH Pekerja @ Rp. 60,000.00
0.167 OH Tukang Batu @ Rp. 70,000.00
0.167 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.422 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.040 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran Box Culvert 100/100 cm HD
Bahan
0.833 bh Box Culvert @ Rp. 4,031,900.00
Tenaga Jumlah (I)
0.667 OH Pekerja @ Rp. 60,000.00
0.167 OH Tukang Batu @ Rp. 70,000.00
0.167 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.422 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.040 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Saluran Box Culvert 120/120 cm HD
Bahan
0.833 bh Box Culvert @ Rp. 5,900,650.00
Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.200 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.422 Jam Crane on truck 35 ton @ Rp. 434,344.47
0.062 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Cover U-Ditch Dimensi 300
Bahan
1.667 bh CU Ditch 30 x 40 @ Rp. 172,500.00
Tenaga Jumlah (I)
0.038 OH Pekerja @ Rp. 60,000.00
0.013 OH Tukang Batu @ Rp. 70,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.031 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Cover U-Ditch Dimensi 400
Bahan
1.667 bh CU Ditch 40 x 50 @ Rp. 247,250.00
Tenaga Jumlah (I)
0.038 OH Pekerja @ Rp. 60,000.00
0.013 OH Tukang Batu @ Rp. 70,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.031 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Cover U-Ditch Dimensi 500
Bahan
1.667 bh CU Ditch 50 x 60 @ Rp. 276,000.00
Tenaga Jumlah (I)
0.050 OH Pekerja @ Rp. 60,000.00
0.017 OH Tukang Batu @ Rp. 70,000.00
0.017 OH Mandor Lapangan @ Rp. 90,000.00
Alat Jumlah (II)
0.058 Jam Flat bed truck 3-4 m3 @ Rp. 414,385.14
1.000 Ls Alat Bantu @ Rp. 1,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan

XVI.ANALISA BIAYA KONSTRUKSI PEKERJAAN BRONJONG


1 m3 Pembangunan penempatan bronjong termasuk penyediaan batu dan kawat brojong untuk
anyaman
Kawat Anyaman 3 mm (untuk 3 m3 bronjong)
25.000 kg Kawat ikat untuk bronjong @ Rp. 20,050.00
Penganyam Jumlah (I)
2.000 org/hr Penganyam bronjong @ Rp. 75,000.00
1.600 org/hr Pekerja @ Rp. 60,000.00
0.080 org/hr Mandor Lapangan @ Rp. 90,000.00
Pengisian dan Penempatan Jumlah (II)
3.000 m3 Batu Belah 15/20 @ Rp. 120,100.00
4.500 org/hr Pekerja @ Rp. 60,000.00
0.075 org/hr Mandor Lapangan @ Rp. 90,000.00
Jumlah (III)
Harga satuan pekerjaan per 3 m3
Harga satuan pekerjaan per 1 m3
Harga setelah dibulatkan
1 m3 Pembangunan penempatan bronjong termasuk penyediaan batu dan kawat brojong untuk
anyaman
Kawat Anyaman Galvanis (untuk 3 m3 bronjong)
25.000 kg Kawat bronjong galvanis @ Rp. 24,850.00
Penganyam Jumlah (I)
2.200 org/hr Penganyam bronjong @ Rp. 75,000.00
1.800 org/hr Pekerja @ Rp. 60,000.00
0.080 org/hr Mandor Lapangan @ Rp. 90,000.00
Pengisian dan Penempatan Jumlah (II)
3.000 m3 Batu Belah 15/20 @ Rp. 120,100.00
4.500 org/hr Pekerja @ Rp. 60,000.00
0.075 org/hr Mandor Lapangan @ Rp. 90,000.00
Jumlah (III)
Harga satuan pekerjaan per 3 m3
Harga satuan pekerjaan per 1 m3
Harga setelah dibulatkan
P.05 1 m3 Pasangan batu bronjong kawat 6 ukuran 100 x 30 x 50 & besi beton 10
Bahan
1.800 m3 Batu Belah 15/20 @ Rp. 120,100.00
4.320 kg Kawat ikat untuk bronjong @ Rp. 20,050.00
24.500 kg Besi beton polos @ Rp. 10,000.00
Tenaga Jumlah (I)
0.750 OH Pekerja @ Rp. 60,000.00
0.300 OH Penganyam bronjong @ Rp. 75,000.00
0.060 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (I)
Harga satuan pekerjaan
Harga setelah dibulatkan
P.05 1 m3 Pasangan batu bronjong kawat 8 ukuran 100 x 30 x 50 & besi beton 12
Bahan
1.800 m3 Batu Belah 15/20 @ Rp. 120,100.00
7.680 kg Kawat ikat untuk bronjong @ Rp. 20,050.00
35.300 kg Besi beton polos @ Rp. 10,000.00
Tenaga Jumlah (I)
0.850 OH Pekerja @ Rp. 60,000.00
0.300 OH Penganyam bronjong @ Rp. 75,000.00
0.060 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (I)
Harga satuan pekerjaan
Harga setelah dibulatkan
P.05 1 m3 Pasangan batu bronjong kawat 10 ukuran 100 x 30 x 50 & besi beton 12
Bahan
1.800 m3 Batu Belah 15/20 @ Rp. 120,100.00
12.000 kg Kawat ikat untuk bronjong @ Rp. 20,050.00
35.300 kg Besi beton polos @ Rp. 10,000.00
Tenaga Jumlah (I)
0.950 OH Pekerja @ Rp. 60,000.00
0.300 OH Penganyam bronjong @ Rp. 75,000.00
0.060 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (I)
Harga satuan pekerjaan
Harga setelah dibulatkan

XVII.ANALISA BIAYA KONSTRUKSI PEKERJAAN TIANG PANCANG


1 m' Tiang pancang Δ 28 x28x28 cm , L = 6,00 m
Bahan
1.000 m' Tiang pancang beton Δ 28x28x28 cm @ Rp. 195,000.00
Type A2, L : 6 M
Alat Jumlah (I)
1.000 m' Biaya pemancangan tiang pancang Ø 300 mm (Dr @ Rp. 83,450.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Tiang pancang dia. 0,30 m , L = 6,00 m
Bahan
1.000 m' Tiang pancang beton diamtr. 300 mm
Type A2, L : 6 m @ Rp. 309,750.00
Alat Jumlah (I)
1.000 m' Biaya pemancangan tiang pancang Ø 300 mm (Dr @ Rp. 83,450.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Tiang pancang 20 / 20 Cm , L = 6,00 m
Bahan
1.000 m' Tiang Pancang beton 20 x 20 cm K.500 @ Rp. 141,000.00
Alat Jumlah (I)
1.000 m' Biaya pemancangan tiang pancang 20 x 20cm (Inje@ Rp. 64,150.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Tiang pancang
BAHAN
1.010 m Tiang Pancang 30 @ Rp. 195,000.00
0.150 kg Kawat las listrik @ Rp. 30,475.00
Tenaga Jumlah (I)
0.025 OH Pekerja @ Rp. 60,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
0.025 OH Operator terampil @ Rp. 100,000.00
0.025 OH Tukang las @ Rp. 80,000.00
PERALATAN Jumlah (II)
0.025 Hari - Sewa Truck Crane @ Rp. 291,450.00
sewa
0.025 Hari - Alat pancang Hammer 2 ton @ Rp. 2,500,000.00
sewa
0.025 Hari - Las listrik diesel @ Rp. 40,300.00
sewa
Hari -
sewa (termasuk solar)
JUMLAH HARGA PERALATAN Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan

XVIII.ANALISA BIAYA KONSTRUKSI PEKERJAAN RIP/RAP BATU GUNUNG (MEKANIS)


1 m3 Urugan batu kali / gunung dengan truck crane hydraulic
Bahan
1.200 m' Batu Belah 15/20 @ Rp. 120,100.00
Alat Jumlah (I)
0.100 Hari Sewa Truck Crane @ Rp. 291,450.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
XIX. PEKERJAAN BONGKARAN DENGAN ANALIS BOW
Membongkar 1 m3 dinding tembok - tembok lbh tbl dr pada dua batu dan bata.
Tenaga
4.000 OH Pekerja @ Rp. 60,000.00
0.400 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 1 m3 dinding tembok 1/2 bata dan membersihkannya
Tenaga
2.000 OH Pekerja @ Rp. 60,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 10 m2 rangka atap dari kayu
Tenaga
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Kayu @ Rp. 90,000.00
0.025 OH Kepala Tukang Kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
1 m2 papan nama proyek
Bahan
1.000 Lbr Plywood tebal 4 mm @ Rp. 77,625.00
0.250 kg Paku usuk 4" @ Rp. 14,000.00
0.021 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
1.200 m2 Banner @ Rp. 31,000.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang Kayu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 rangka plafond hollow 60x60 cm
Bahan
4.000 m Hollow 2/4 - 4m @ Rp. 6,468.75
100%xrangk Ls Assesoris (perkuatan, las dll) @ Rp. 6,468.75
Tenaga Jumlah (I)
0.350 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Besi @ Rp. 75,000.00
0.035 OH Kepala Tukang Besi @ Rp. 80,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 rangka plafond hollow 60x120 cm
Bahan
3.500 m Hollow 2/4 - 4m @ Rp. 6,468.75
0.110 kg Paku skrup @ Rp. 20,125.00
Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Besi @ Rp. 75,000.00
0.025 OH Kepala Tukang Besi @ Rp. 80,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 dinding pemisah kalsiboard rangkap, rangka galvalume
Bahan
0.542 btg Galvalume C-075 @ Rp. 86,825.00
0.150 kg Paku skrup @ Rp. 20,125.00
0.860 lembar Kalsiboard 4 mm @ Rp. 56,350.00
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Besi @ Rp. 75,000.00
0.045 OH Kepala Tukang Besi @ Rp. 80,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 dinding pemisah Gypsumboard rangkap, rangka galvalume
Bahan
0.542 btg Galvalume C-075 @ Rp. 86,825.00
0.150 kg Paku skrup @ Rp. 20,125.00
0.860 lembar Gypsum board 9 mm @ Rp. 96,312.50
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Besi @ Rp. 75,000.00
0.045 OH Kepala Tukang Besi @ Rp. 80,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120 cm, untuk partisi
Bahan
3.500 m' Besi Hollow 4 Cm x 4 Cm @ Rp. 16,291.67
100%xrangk Ls Assesoris (perkuatan,las dll ) @ Rp. 16,291.67
Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Besi @ Rp. 75,000.00
0.025 OH Kepala Tukang Besi @ Rp. 80,000.00
0.013 OH Mandor lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
` Pemasangan 1 m2 rangka galvalume 1x40.20.0,075, modul 60x120 cm, untuk partisi
Bahan
3.500 m' Galvalume C-075 @ Rp. 14,470.83
0.110 kg Paku skrup @ Rp. 20,125.00
Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Besi @ Rp. 75,000.00
0.025 OH Kepala Tukang Besi @ Rp. 80,000.00
0.013 OH Mandor lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
a2 Membongkar 1 unit AC
Tenaga
2.000 OH Tukang Listrik @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 1 unit panel
Tenaga
2.000 OH Tukang Listrik @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 1 m² lantai keramik
Tenaga
0.250 OH Pekerja @ Rp. 60,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 1 m³ aspal
Tenaga
3.000 OH Pekerja @ Rp. 60,000.00
0.350 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 1 m² paving
Tenaga
0.250 OH Pekerja @ Rp. 60,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
1 m2 Pengecatan water profing 1x lapis
Bahan
25.000 kg Waterprofing @ Rp. 50,150.00
0.010 bh Kuas Uk 4" @ Rp. 19,300.00
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
1.500 OH Tukang cat @ Rp. 75,000.00
0.150 OH Kepala tukang cat @ Rp. 85,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Jumlah Pekerjaan 15m2
Harga satuan pekerjaan
Harga setelah dibulatkan

Banyuwangi, Maret 2017

KEPALA DINAS PEKERJAAN UMUM


BINA MARGA, CIPTA KARYA DAN TATA RU
KABUPATEN BANYUWANGI

Ir. H. MUJIONO, M.Si


Pembina Tk. I
NIP. 19660915 199602 1 002
AR ANALISA SATUAN PEKERJAAN
NTAH KABUPATEN BANYUWANGI
TAHUN 2017

= Rp. 14,437.50
= Rp. 6,850.00
= Rp. 1,000.00
= Rp. 1,275.75
= Rp. 248,400.00
= Rp. 840.00
= Rp. 272,803.25
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 1,800.00
= Rp. 45,600.00
= Rp. 318,403.25
= Rp. 318,400.00

= Rp. 82,110.00
= Rp. 120,750.00
= Rp. 7,035.00
= Rp. 1,680.00
= Rp. 18,500.00
= Rp. 16,440.00
= Rp. 246,515.00
= Rp. 10,800.00
= Rp. 9,000.00
= Rp. 7,000.00
= Rp. 450.00
= Rp. 27,250.00
= Rp. 273,765.00
= Rp. 273,760.00

= Rp. 82,110.00
= Rp. 127,000.00
= Rp. 702.50
= Rp. 18,500.00
= Rp. 16,440.00
= Rp. 244,752.50
= Rp. 12,000.00
= Rp. 7,500.00
= Rp. 7,000.00
= Rp. 1,800.00
= Rp. 28,300.00
= Rp. 273,052.50
= Rp. 273,050.00

= Rp. 14,437.50
= Rp. 3,425.00
= Rp. 82,110.00
= Rp. 1,000.00
= Rp. 1,275.75
= Rp. 248,400.00
= Rp. 840.00
= Rp. 17,181.00
= Rp. 368,669.25
= Rp. 12,000.00
= Rp. 36,000.00
= Rp. 1,800.00
= Rp. 1,800.00
= Rp. 51,600.00
= Rp. 420,269.25
= Rp. 420,260.00

= Rp. 11,550.00
= Rp. 2,740.00
= Rp. 46,250.00
= Rp. 1,000.00
= Rp. 1,275.75
= Rp. 840.00
= Rp. 63,655.75
= Rp. 12,000.00
= Rp. 27,000.00
= Rp. 1,800.00
= Rp. 1,800.00
= Rp. 42,600.00
= Rp. 106,255.75
= Rp. 106,250.00

= Rp. 41,400.00
= Rp. 280.00
= Rp. 34,615.00
= Rp. 76,295.00
= Rp. 6,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 16,350.00
= Rp. 92,645.00
= Rp. 92,640.00

= Rp. 14,437.50
= Rp. 621,000.00
= Rp. 1,120.00
= Rp. 22,495.00
= Rp. 47,950.00
= Rp. 27,750.00
= Rp. 20,000.00
= Rp. 21,262.50
= Rp. 22,500.00
= Rp. 20,843.75
= Rp. 1,510.00
= Rp. 6,884.00
= Rp. 7,650.00
= Rp. 4,657.50
= Rp. 840,060.25
= Rp. 120,000.00
= Rp. 180,000.00
= Rp. 70,000.00
= Rp. 27,000.00
= Rp. 4,500.00
= Rp. 401,500.00
= Rp. 1,241,560.25
= Rp. 1,241,560.00

= Rp. 19,635.00
= Rp. 724,500.00
= Rp. 4,200.00
= Rp. 14,385.00
= Rp. 6,000.00
= Rp. 7,087.50
= Rp. 102,637.50
= Rp. 20,843.75
= Rp. 899,288.75
= Rp. 60,000.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 4,500.00
= Rp. 262,500.00
= Rp. 1,161,788.75
= Rp. 1,161,780.00

= Rp. 34,650.00
= Rp. 952,200.00
= Rp. 9,800.00
= Rp. 102,637.50
= Rp. 1,099,287.50
= Rp. 60,000.00
= Rp. 135,000.00
= Rp. 13,500.00
= Rp. 4,500.00
= Rp. 213,000.00
= Rp. 1,312,287.50
= Rp. 1,312,280.00

= Rp. 172,500.00
= Rp. 46,575.00
= Rp. 35,620.00
= Rp. 18,500.00
= Rp. 39,750.00
= Rp. 10,500.00
= Rp. 37,950.00
= Rp. 4,500.00
= Rp. 21,316.40
= Rp. 37,974.00
= Rp. 7,550.00
= Rp. 27,710.00
= Rp. 460,445.40
= Rp. 72,000.00
= Rp. 28,000.00
= Rp. 3,600.00
= Rp. 4,500.00
= Rp. 108,100.00
= Rp. 568,545.40
= Rp. 568,540.00
= Rp. 6,000.00
= Rp. 4,500.00
= Rp. 10,500.00
= Rp. 10,500.00

= Rp. 14,437.50
= Rp. 641,700.00
= Rp. 4,200.00
= Rp. 24,660.00
= Rp. 6,000.00
= Rp. 7,087.50
= Rp. 102,637.50
= Rp. 104,793.75
= Rp. 905,516.25
= Rp. 60,000.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 4,500.00
= Rp. 262,500.00
= Rp. 1,168,016.25
= Rp. 1,168,010.00

= Rp. 111,245.40
= Rp. 1,120.00
= Rp. 591.68
= Rp. 112,957.08
= Rp. 27,000.00
= Rp. 2,700.00
= Rp. 29,700.00
= Rp. 142,657.08
= Rp. 142,650.00

= Rp. 17,968.75
= Rp. 3,682.80
= Rp. 21,651.55
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 18,000.00
= Rp. 4,500.00
= Rp. 46,500.00
= Rp. 68,151.55
= Rp. 68,150.00

= Rp. 800,040.00
= Rp. 59,940.00
= Rp. 859,980.00
= Rp. 859,980.00

= Rp. 400,020.00
= Rp. 29,970.00
= Rp. 429,990.00
= Rp. 429,990.00

= Rp. 20,125.00
20,125.00
= Rp. 49,079.50
49,079.50
= Rp. 72,000.00
= Rp. 10,800.00
82,800.00
= Rp. 152,004.50
= Rp. 152,000.00

= Rp. 45,000.00
= Rp. 2,250.00
= Rp. 47,250.00
= Rp. 47,250.00

= Rp. 54,000.00
= Rp. 4,050.00
= Rp. 58,050.00
= Rp. 58,050.00

= Rp. 63,000.00
= Rp. 6,030.00
= Rp. 69,030.00
= Rp. 69,030.00

= Rp. 60,000.00
= Rp. 2,880.00
= Rp. 62,880.00
= Rp. 62,880.00

= Rp. 90,000.00
= Rp. 5,400.00
= Rp. 95,400.00
= Rp. 95,400.00

= Rp. 72,000.00
= Rp. 4,050.00
= Rp. 76,050.00
= Rp. 76,050.00

= Rp. 3,000.00
= Rp. 450.00
= Rp. 3,450.00
= Rp. 3,450.00

= Rp. 19,800.00
= Rp. 900.00
= Rp. 20,700.00
= Rp. 20,700.00

= Rp. 15,750.00
= Rp. 15,750.00

= Rp. 19,350.00
= Rp. 19,350.00

= Rp. 23,010.00
= Rp. 23,010.00

= Rp. 20,960.00
= Rp. 20,960.00

= Rp. 31,800.00
= Rp. 31,800.00

= Rp. 25,350.00
= Rp. 25,350.00

= Rp. 30,000.00
= Rp. 4,500.00
= Rp. 34,500.00
= Rp. 34,500.00

= Rp. 180,000.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 900.00
= Rp. 18,900.00
= Rp. 198,900.00
= Rp. 198,900.00

= Rp. 55,296.00
= Rp. 74,000.00
= Rp. 88,164.00
= Rp. 217,460.00
= Rp. 48,000.00
= Rp. 28,000.00
= Rp. 3,600.00
= Rp. 7,200.00
= Rp. 86,800.00
= Rp. 304,260.00
= Rp. 304,260.00

= Rp. 101,580.80
= Rp. 115,320.00
= Rp. 216,900.80
= Rp. 48,000.00
= Rp. 28,000.00
= Rp. 3,600.00
= Rp. 7,200.00
= Rp. 86,800.00
= Rp. 303,700.80
= Rp. 303,700.00

= Rp. 118,800.00
= Rp. 118,800.00
= Rp. 9,000.00
= Rp. 1,350.00
= Rp. 10,350.00
= Rp. 129,150.00
= Rp. 129,150.00

= Rp. 154,800.00
= Rp. 154,800.00
= Rp. 15,000.00
= Rp. 2,250.00
= Rp. 17,250.00
= Rp. 172,050.00
= Rp. 172,050.00

= Rp. 111,600.00
= Rp. 111,600.00
= Rp. 15,000.00
= Rp. 2,250.00
= Rp. 17,250.00
= Rp. 128,850.00
= Rp. 128,850.00

= Rp. 91,800.00
= Rp. 91,800.00
= Rp. Rp 100,000.00
= Rp. Rp 55,000.00
= Rp. 155,000.00
= Rp. 193,200.00
= Rp. 193,200.00
= Rp. 440,000.00
= Rp. 440,000.00

= Rp. 91,800.00
= Rp. 91,800.00
= Rp. 100,000.00
= Rp. 55,000.00
= Rp. 100,000.00
= Rp. 255,000.00
= Rp. 276,000.00
= Rp. 276,000.00
= Rp. 622,800.00
= Rp. 622,800.00

= Rp. 20,400.00
= Rp. 20,400.00
= Rp. 105,000.00
= Rp. 60,000.00
= Rp. 165,000.00
= Rp. 57,500.00
= Rp. 57,500.00
= Rp. 242,900.00
= Rp. 242,900.00

= Rp. 170,000.00
= Rp. 170,000.00
= Rp. 100,000.00
= Rp. 55,000.00
= Rp. 155,000.00
= Rp. 914.29
= Rp. 914.29
= Rp. 325,914.29
= Rp. 325,910.00

= Rp. 144,120.00
= Rp. 276,740.00
= Rp. 89,725.00
= Rp. 510,585.00
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 666,585.00
= Rp. 666,580.00

= Rp. 144,120.00
= Rp. 223,310.00
= Rp. 96,200.00
= Rp. 463,630.00
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 619,630.00
= Rp. 619,630.00

= Rp. 144,120.00
= Rp. 186,320.00
= Rp. 100,640.00
= Rp. 431,080.00
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 587,080.00
= Rp. 587,080.00

= Rp. 144,120.00
= Rp. 160,290.00
= Rp. 103,785.00
= Rp. 408,195.00
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 564,195.00
= Rp. 564,190.00

= Rp. 144,120.00
= Rp. 124,670.00
= Rp. 108,040.00
= Rp. 376,830.00
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 532,830.00
= Rp. 532,830.00

= Rp. 144,120.00
= Rp. 83,570.00
= Rp. 60,211.20
= Rp. 91,020.00
= Rp. 378,921.20
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 534,921.20
= Rp. 534,920.00

= Rp. 144,120.00
= Rp. 56,170.00
= Rp. 53,657.60
= Rp. 96,755.00
= Rp. 350,702.60
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 506,702.60
= Rp. 506,700.00

= Rp. 144,120.00
= Rp. 64,800.00
= Rp. 208,920.00
= Rp. 46,800.00
= Rp. 27,300.00
= Rp. 3,510.00
= Rp. 3,510.00
= Rp. 81,120.00
= Rp. 290,040.00
= Rp. 290,040.00

= Rp. 57,648.00
= Rp. 265,780.00
= Rp. 62,400.00
= Rp. 66,339.00
= Rp. 1,260,000.00
= Rp. 25,290.00
= Rp. 1,737,457.00
= Rp. 204,000.00
= Rp. 59,500.00
= Rp. 7,650.00
= Rp. 15,300.00
= Rp. 286,450.00
= Rp. 2,023,907.00
= Rp. 2,023,900.00

= Rp. 54,045.00
= Rp. 265,780.00
= Rp. 62,400.00
= Rp. 66,339.00
= Rp. 448,564.00
= Rp. 144,000.00
= Rp. 56,000.00
= Rp. 7,200.00
= Rp. 10,710.00
= Rp. 217,910.00
= Rp. 666,474.00
= Rp. 666,470.00

= Rp. 315,100.00
= Rp. 127,571.43
= Rp. 266,249.75
= Rp. 3,000.00
= Rp. 711,921.18
= Rp. 72,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 5,400.00
= Rp. 93,200.00
= Rp. 805,121.18
= Rp. 805,120.00

= Rp. 338,390.00
= Rp. 124,142.86
= Rp. 258,990.75
= Rp. 3,225.00
= Rp. 724,748.61
= Rp. 79,380.00
= Rp. 13,230.00
= Rp. 1,710.00
= Rp. 11,880.00
= Rp. 106,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 865,448.61
= Rp. 865,440.00

= Rp. 378,120.00
= Rp. 118,285.71
= Rp. 262,361.00
= Rp. 3,225.00
= Rp. 761,991.71
= Rp. 79,380.00
= Rp. 13,230.00
= Rp. 1,710.00
= Rp. 11,880.00
= Rp. 106,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 902,691.71
= Rp. 902,690.00

= Rp. 409,630.00
= Rp. 114,142.86
= Rp. 263,657.25
= Rp. 3,225.00
= Rp. 790,655.11
= Rp. 79,380.00
= Rp. 13,230.00
= Rp. 1,710.00
= Rp. 11,880.00
= Rp. 106,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 931,355.11
= Rp. 931,350.00

= Rp. 315,100.00
= Rp. 127,571.43
= Rp. 266,249.75
= Rp. 3,000.00
= Rp. 711,921.18
= Rp. 72,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 5,400.00
= Rp. 93,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 839,621.18
= Rp. 839,620.00

= Rp. 446,620.00
= Rp. 108,571.43
= Rp. 266,768.25
= Rp. 3,225.00
= Rp. 825,184.68
= Rp. 79,380.00
= Rp. 13,230.00
= Rp. 1,710.00
= Rp. 11,880.00
= Rp. 106,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 965,884.68
= Rp. 965,880.00

= Rp. 944,265.00
= Rp. 944,265.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,105,178.20
= Rp. 1,105,170.00

= Rp. 508,270.00
= Rp. 99,714.29
= Rp. 271,434.75
= Rp. 3,225.00
= Rp. 882,644.04
= Rp. 79,380.00
= Rp. 13,230.00
= Rp. 1,710.00
= Rp. 11,880.00
= Rp. 106,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 1,023,344.04
= Rp. 1,023,340.00

= Rp. 961,860.00
= Rp. 961,860.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,122,773.20
= Rp. 1,122,770.00

= Rp. 973,590.00
= Rp. 973,590.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,134,503.20
= Rp. 1,134,500.00

= Rp. 985,320.00
= Rp. 985,320.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,146,233.20
= Rp. 1,146,230.00

= Rp. 997,050.00
= Rp. 997,050.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,157,963.20
= Rp. 1,157,960.00

= Rp. 1,043,970.00
= Rp. 1,043,970.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,204,883.20
= Rp. 1,204,880.00
t 24 jam diperlukan penambahan bahan tambahan sesuai

= Rp. 613,760.00
= Rp. 95,285.71
= Rp. 259,250.00
= Rp. 3,000.00
= Rp. 971,295.71
= Rp. 126,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 9,450.00
= Rp. 163,100.00
= Rp. 1,134,395.71
= Rp. 1,134,390.00

= Rp. 105,000.00
= Rp. 2,107.50
= Rp. 107,107.50
= Rp. 4,200.00
= Rp. 5,250.00
= Rp. 560.00
= Rp. 360.00
= Rp. 10,370.00
= Rp. 117,477.50
= Rp. 117,470.00

= Rp. 110,250.00
= Rp. 2,107.50
= Rp. 112,357.50
= Rp. 4,200.00
= Rp. 5,250.00
= Rp. 560.00
= Rp. 360.00
= Rp. 10,370.00
= Rp. 122,727.50
= Rp. 122,720.00

= Rp. 105,000.00
= Rp. 1,405.00
= Rp. 106,405.00
= Rp. 3,000.00
= Rp. 3,750.00
= Rp. 400.00
= Rp. 270.00
= Rp. 7,420.00
= Rp. 113,825.00
= Rp. 113,820.00

= Rp. 22,852.45
= Rp. 702.50
= Rp. 23,554.95
= Rp. 1,500.00
= Rp. 1,875.00
= Rp. 2,000.00
= Rp. 90.00
= Rp. 5,465.00
= Rp. 29,019.95
= Rp. 29,010.00

= Rp. 4,312,500.00
= Rp. 718,750.00

= Rp. 72,163.65
= Rp. 601,363.79
= Rp. 601,360.00

= Rp. 5,462,500.00
= Rp. 910,416.67

= Rp. 91,407.30
= Rp. 761,727.47
= Rp. 761,720.00

= Rp. 138,000.00
= Rp. 4,200.00
= Rp. 142,200.00
= Rp. 31,200.00
= Rp. 23,400.00
= Rp. 2,340.00
= Rp. 2,340.00
= Rp. 59,280.00
= Rp. 201,480.00
= Rp. 201,480.00

= Rp. 155,250.00
= Rp. 4,200.00
= Rp. 159,450.00
= Rp. 31,200.00
= Rp. 23,400.00
= Rp. 2,340.00
= Rp. 2,340.00
= Rp. 59,280.00
= Rp. 218,730.00
= Rp. 218,730.00

= Rp. 155,250.00
= Rp. 4,200.00
= Rp. 159,450.00
= Rp. 79,725.00
= Rp. 31,200.00
= Rp. 23,400.00
= Rp. 2,340.00
= Rp. 2,340.00
= Rp. 59,280.00
= Rp. 139,005.00
= Rp. 139,000.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 23,100.00
= Rp. 263,443.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 338,683.00
= Rp. 338,680.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 269,093.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 344,333.00
= Rp. 344,330.00
= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 269,093.00
= Rp. 134,546.50
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 209,786.50
= Rp. 209,780.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 75,036.60
= Rp. 34,212.50
= Rp. 23,100.00
= Rp. 275,949.10
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 351,189.10
= Rp. 351,180.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 75,036.60
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 281,599.10
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 356,839.10
= Rp. 356,830.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 75,036.60
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 281,599.10
= Rp. 140,799.55
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 216,039.55
= Rp. 216,030.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 69,300.00
= Rp. 309,643.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 384,883.00
= Rp. 384,880.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 86,250.00
= Rp. 326,593.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 401,833.00
= Rp. 401,830.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 86,250.00
= Rp. 326,593.00
= Rp. 163,296.50
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 238,536.50
= Rp. 238,530.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 34,212.50
= Rp. 177,812.50
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 253,052.50
= Rp. 253,050.00
= Rp. 103,500.00
= Rp. 5,600.00
= Rp. 83,374.00
= Rp. 34,212.50
= Rp. 34,650.00
= Rp. 261,336.50
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 336,576.50
= Rp. 336,570.00

= Rp. 103,500.00
= Rp. 5,600.00
= Rp. 83,374.00
= Rp. 34,212.50
= Rp. 43,125.00
= Rp. 269,811.50
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 345,051.50
= Rp. 345,050.00

= Rp. 103,500.00
= Rp. 5,600.00
= Rp. 83,374.00
= Rp. 34,212.50
= Rp. 43,125.00
= Rp. 269,811.50
= Rp. 134,905.75
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 210,145.75
= Rp. 210,140.00

= Rp. 103,500.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 234,593.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 309,833.00
= Rp. 309,830.00

= Rp. 103,500.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 234,593.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 309,833.00
= Rp. 309,830.00

= Rp. 110,053.68
= Rp. 8,400.00
= Rp. 7,187.50
= Rp. 125,641.18
= Rp. 9,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 720.00
= Rp. 14,670.00
= Rp. 140,311.18
= Rp. 140,310.00

= Rp. 110,053.68
= Rp. 8,400.00
= Rp. 7,187.50
= Rp. 125,641.18
= Rp. 9,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 720.00
= Rp. 14,670.00
= Rp. 140,311.18
= Rp. 140,310.00

= Rp. 690,000.00
= Rp. 21,000.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 3,108,682.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,580.00
= Rp. 23,850.00
= Rp. 580,430.00
= Rp. 3,689,112.50
= Rp. 3,689,110.00

= Rp. 690,000.00
= Rp. 21,000.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 3,108,682.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,580.00
= Rp. 23,850.00
= Rp. 580,430.00
= Rp. 3,689,112.50
= Rp. 3,689,110.00

= Rp. 931,500.00
= Rp. 28,000.00
= Rp. 2,100,000.00
= Rp. 42,150.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 3,892,720.00
= Rp. 339,000.00
= Rp. 19,250.00
= Rp. 140,400.00
= Rp. 105,000.00
= Rp. 29,070.00
= Rp. 25,470.00
= Rp. 658,190.00
= Rp. 4,550,910.00
= Rp. 4,550,910.00

= Rp. 1,380,000.00
= Rp. 56,000.00
= Rp. 3,150,000.00
= Rp. 63,225.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 625,305.00
= Rp. 342,125.00
= Rp. 287,500.00
= Rp. 6,695,225.00
= Rp. 423,000.00
= Rp. 19,250.00
= Rp. 148,500.00
= Rp. 157,500.00
= Rp. 36,270.00
= Rp. 31,770.00
= Rp. 816,290.00
= Rp. 7,511,515.00
= Rp. 7,511,510.00

= Rp. 1,380,000.00
= Rp. 56,000.00
= Rp. 3,150,000.00
= Rp. 63,225.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 625,305.00
= Rp. 342,125.00
= Rp. 287,500.00
= Rp. 6,695,225.00
= Rp. 423,000.00
= Rp. 19,250.00
= Rp. 148,500.00
= Rp. 157,500.00
= Rp. 36,270.00
= Rp. 31,770.00
= Rp. 816,290.00
= Rp. 7,511,515.00
= Rp. 7,511,510.00

= Rp. 1,104,000.00
= Rp. 44,800.00
= Rp. 2,100,000.00
= Rp. 42,150.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 583,618.00
= Rp. 273,700.00
= Rp. 230,000.00
= Rp. 5,169,338.00
= Rp. 381,000.00
= Rp. 19,250.00
= Rp. 148,500.00
= Rp. 105,000.00
= Rp. 29,970.00
= Rp. 28,620.00
= Rp. 712,340.00
= Rp. 5,881,678.00
= Rp. 5,881,670.00

= Rp. 1,104,000.00
= Rp. 44,800.00
= Rp. 2,100,000.00
= Rp. 42,150.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 583,618.00
= Rp. 273,700.00
= Rp. 230,000.00
= Rp. 5,169,338.00
= Rp. 381,000.00
= Rp. 19,250.00
= Rp. 148,500.00
= Rp. 105,000.00
= Rp. 29,970.00
= Rp. 28,620.00
= Rp. 712,340.00
= Rp. 5,881,678.00
= Rp. 5,881,670.00

= Rp. 1,104,000.00
= Rp. 44,800.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 500,244.00
= Rp. 273,700.00
= Rp. 460,000.00
= Rp. 4,780,426.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,850.00
= Rp. 23,850.00
= Rp. 580,700.00
= Rp. 5,361,126.50
= Rp. 5,361,120.00

= Rp. 1,104,000.00
= Rp. 44,800.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 500,244.00
= Rp. 273,700.00
= Rp. 460,000.00
= Rp. 4,780,426.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,850.00
= Rp. 23,850.00
= Rp. 580,700.00
= Rp. 5,361,126.50
= Rp. 5,361,120.00

= Rp. 828,000.00
= Rp. 44,800.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 666,992.00
= Rp. 273,700.00
= Rp. 345,000.00
= Rp. 4,556,174.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,580.00
= Rp. 23,850.00
= Rp. 580,430.00
= Rp. 5,136,604.50
= Rp. 5,136,600.00

= Rp. 828,000.00
= Rp. 44,800.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 666,992.00
= Rp. 273,700.00
= Rp. 345,000.00
= Rp. 4,556,174.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,580.00
= Rp. 23,850.00
= Rp. 580,430.00
= Rp. 5,136,604.50
= Rp. 5,136,600.00

= Rp. 862,500.00
= Rp. 42,000.00
= Rp. 2,100,000.00
= Rp. 42,150.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 437,713.50
= Rp. 244,375.00
= Rp. 201,250.00
= Rp. 4,721,058.50
= Rp. 339,000.00
= Rp. 19,250.00
= Rp. 140,400.00
= Rp. 105,000.00
= Rp. 29,070.00
= Rp. 25,470.00
= Rp. 658,190.00
= Rp. 5,379,248.50
= Rp. 5,379,240.00

= Rp. 862,500.00
= Rp. 42,000.00
= Rp. 2,100,000.00
= Rp. 42,150.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 222,750.00
= Rp. 437,713.50
= Rp. 244,375.00
= Rp. 201,250.00
= Rp. 4,721,058.50
= Rp. 339,000.00
= Rp. 19,250.00
= Rp. 140,400.00
= Rp. 105,000.00
= Rp. 29,070.00
= Rp. 25,470.00
= Rp. 658,190.00
= Rp. 5,379,248.50
= Rp. 5,379,240.00

= Rp. 6,900.00
= Rp. 140.00
= Rp. 30,000.00
= Rp. 6,322.50
= Rp. 5,480.00
= Rp. 1,200.00
= Rp. 2,475.00
= Rp. 52,517.50
= Rp. 10,800.00
= Rp. 1,400.00
= Rp. 1,800.00
= Rp. 1,500.00
= Rp. 540.00
= Rp. 810.00
= Rp. 16,850.00
= Rp. 69,367.50
= Rp. 69,360.00

= Rp. 10,350.00
= Rp. 280.00
= Rp. 36,000.00
= Rp. 702.50
= Rp. 7,535.00
= Rp. 1,800.00
= Rp. 4,125.00
= Rp. 60,792.50
= Rp. 17,820.00
= Rp. 2,310.00
= Rp. 2,970.00
= Rp. 2,475.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,825.00
= Rp. 88,617.50
= Rp. 88,610.00

= Rp. 274,000.00
= Rp. 104,400.00
= Rp. 122,188.50
= Rp. 500,588.50
= Rp. 79,200.00
= Rp. 15,400.00
= Rp. 1,980.00
= Rp. 11,880.00
= Rp. 108,460.00
= Rp. 609,048.50
= Rp. 609,040.00

an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP

= Rp. 105,000.00
= Rp. 59,595.00
= Rp. 14,800.00
= Rp. 179,395.00
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 233,895.00
= Rp. 233,890.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP

= Rp. 105,000.00
= Rp. 45,141.50
= Rp. 16,835.00
= Rp. 166,976.50
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 221,476.50
= Rp. 221,470.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP

= Rp. 105,000.00
= Rp. 36,373.50
= Rp. 17,205.00
= Rp. 158,578.50
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 213,078.50
= Rp. 213,070.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP

= Rp. 105,000.00
= Rp. 30,414.00
= Rp. 18,870.00
= Rp. 154,284.00
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 208,784.00
= Rp. 208,780.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP

= Rp. 105,000.00
= Rp. 25,345.00
= Rp. 22,570.00
= Rp. 152,915.00
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 207,415.00
= Rp. 207,410.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP

= Rp. 105,000.00
= Rp. 13,809.60
= Rp. 17,112.50
= Rp. 11,264.00
= Rp. 147,186.10
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 201,686.10
= Rp. 201,680.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 2 PP

= Rp. 52,500.00
= Rp. 25,961.50
= Rp. 7,030.00
= Rp. 85,491.50
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 112,741.50
= Rp. 112,740.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 3 PP

= Rp. 52,500.00
= Rp. 19,686.90
= Rp. 7,400.00
= Rp. 79,586.90
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 106,836.90
= Rp. 106,830.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 4 PP

= Rp. 52,500.00
= Rp. 15,755.00
= Rp. 7,955.00
= Rp. 76,210.00
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 103,460.00
= Rp. 103,460.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 5 PP

= Rp. 52,500.00
= Rp. 13,261.60
= Rp. 8,325.00
= Rp. 74,086.60
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 101,336.60
= Rp. 101,330.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 6 PP

= Rp. 52,500.00
= Rp. 11,398.40
= Rp. 9,065.00
= Rp. 72,963.40
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 100,213.40
= Rp. 100,210.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 8 PP

= Rp. 52,500.00
= Rp. 8,905.00
= Rp. 9,250.00
= Rp. 70,655.00
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 97,905.00
= Rp. 97,900.00

= Rp. 258,750.00
= Rp. 15,070.00
= Rp. 6,475.00
= Rp. 280,295.00
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 307,545.00
= Rp. 307,540.00

= Rp. 258,750.00
= Rp. 15,070.00
= Rp. 6,475.00
= Rp. 280,295.00
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 307,545.00
= Rp. 307,540.00
spos ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 P

= Rp. 56,000.00
= Rp. 19,180.00
= Rp. 5,920.00
= Rp. 81,100.00
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 112,300.00
= Rp. 112,300.00

= Rp. 21,240.48
= Rp. 2,960.00
= Rp. 24,200.48
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 55,400.48
= Rp. 55,400.00

= Rp. 14,006.88
= Rp. 3,700.00
= Rp. 17,706.88
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 48,906.88
= Rp. 48,900.00

= Rp. 10,653.12
= Rp. 4,255.00
= Rp. 14,908.12
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 46,108.12
= Rp. 46,100.00

= Rp. 8,548.80
= Rp. 4,440.00
= Rp. 12,988.80
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 44,188.80
= Rp. 44,180.00

= Rp. 7,102.08
= Rp. 4,810.00
= Rp. 11,912.08
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 43,112.08
= Rp. 43,110.00

= Rp. 6,049.92
= Rp. 4,995.00
= Rp. 11,044.92
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 42,244.92
= Rp. 42,240.00

= Rp. 5,392.32
= Rp. 5,180.00
= Rp. 10,572.32
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 41,772.32
= Rp. 41,770.00

= Rp. 4,734.72
= Rp. 5,365.00
= Rp. 10,099.72
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 41,299.72
= Rp. 41,290.00

= Rp. 7,891.20
= Rp. 1,228.80
= Rp. 2,405.00
= Rp. 11,525.00
= Rp. 21,600.00
= Rp. 8,400.00
= Rp. 1,080.00
= Rp. 1,620.00
= Rp. 32,700.00
= Rp. 44,225.00
= Rp. 44,220.00

= Rp. 4,110.00
= Rp. 2,048.00
= Rp. 3,700.00
= Rp. 9,858.00
= Rp. 21,600.00
= Rp. 8,400.00
= Rp. 1,080.00
= Rp. 1,620.00
= Rp. 32,700.00
= Rp. 42,558.00
= Rp. 42,550.00

= Rp. 12.33
= Rp. 3,686.40
= Rp. 1,665.00
= Rp. 5,363.73
= Rp. 26,400.00
= Rp. 8,400.00
= Rp. 1,080.00
= Rp. 1,620.00
= Rp. 37,500.00
= Rp. 42,863.73
= Rp. 42,860.00

= Rp. 9.59
= Rp. 2,867.20
= Rp. 2,775.00
= Rp. 5,651.79
= Rp. 21,600.00
= Rp. 8,400.00
= Rp. 1,080.00
= Rp. 1,620.00
= Rp. 32,700.00
= Rp. 38,351.79
= Rp. 38,350.00

= Rp. 18,675.84
= Rp. 4,995.00
= Rp. 23,670.84
= Rp. 24,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 1,980.00
= Rp. 41,780.00
= Rp. 65,450.84
= Rp. 65,450.00

= Rp. 14,204.16
= Rp. 5,735.00
= Rp. 19,939.16
= Rp. 15,600.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 1,170.00
= Rp. 32,570.00
= Rp. 52,509.16
= Rp. 52,500.00

= Rp. 11,398.40
= Rp. 5,920.00
= Rp. 17,318.40
= Rp. 24,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 1,980.00
= Rp. 41,780.00
= Rp. 59,098.40
= Rp. 59,090.00

= Rp. 9,469.44
= Rp. 6,475.00
= Rp. 15,944.44
= Rp. 24,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 1,980.00
= Rp. 41,780.00
= Rp. 57,724.44
= Rp. 57,720.00

= Rp. 8,066.56
= Rp. 6,660.00
= Rp. 14,726.56
= Rp. 24,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 1,980.00
= Rp. 41,780.00
= Rp. 56,506.56
= Rp. 56,500.00

= Rp. 12.33
= Rp. 3,686.40
= Rp. 3,330.00
= Rp. 7,028.73
= Rp. 26,400.00
= Rp. 15,400.00
= Rp. 1,980.00
= Rp. 1,980.00
= Rp. 45,760.00
= Rp. 52,788.73
= Rp. 52,780.00

= Rp. 7,102.08
= Rp. 4,810.00
= Rp. 11,912.08
= Rp. 9,000.00
= Rp. 5,250.00
= Rp. 720.00
= Rp. 720.00
= Rp. 15,690.00
= Rp. 27,602.08
= Rp. 27,600.00

= Rp. 685.00
= Rp. 2,405.00
= Rp. 3,090.00
= Rp. 4,800.00
= Rp. 28,000.00
= Rp. 3,600.00
= Rp. 360.00
= Rp. 36,760.00
= Rp. 39,850.00
= Rp. 39,850.00

= Rp. 685.00
= Rp. 2,405.00
= Rp. 3,090.00
= Rp. 4,800.00
= Rp. 28,000.00
= Rp. 3,600.00
= Rp. 360.00
= Rp. 36,760.00
= Rp. 39,850.00
= Rp. 39,850.00

= Rp. 5,918.40
= Rp. 1,110.00
= Rp. 7,028.40
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 34,278.40
= Rp. 34,270.00
= Rp. 4,257.96
= Rp. 4,257.96
= Rp. 9,000.00
= Rp. 5,250.00
= Rp. 720.00
= Rp. 720.00
= Rp. 15,690.00
= Rp. 19,947.96
= Rp. 19,940.00

= Rp. 2,192.00
= Rp. 2,192.00
= Rp. 4,200.00
= Rp. 2,450.00
= Rp. 360.00
= Rp. 360.00
= Rp. 7,370.00
= Rp. 9,562.00
= Rp. 9,560.00

= Rp. 8,685.80
= Rp. 2,220.00
= Rp. 10,905.80
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 42,105.80
= Rp. 42,100.00

= Rp. 4,452.50
= Rp. 4,452.50
= Rp. 12,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 900.00
= Rp. 20,800.00
= Rp. 25,252.50
= Rp. 25,250.00

= Rp. 4,110.00
= Rp. 4,110.00
= Rp. 12,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 900.00
= Rp. 20,800.00
= Rp. 24,910.00
= Rp. 24,910.00

= Rp. 20,901,320.00
= Rp. 17,500.00
= Rp. 28,750.00
= Rp. 20,947,570.00
= Rp. 420,000.00
= Rp. 1,890,000.00
= Rp. 189,000.00
= Rp. 31,500.00
= Rp. 2,530,500.00
= Rp. 23,478,070.00
= Rp. 23,478,070.00

= Rp. 11,592,000.00
= Rp. 17,500.00
= Rp. 21,000.00
= Rp. 11,630,500.00
= Rp. 360,000.00
= Rp. 1,620,000.00
= Rp. 162,000.00
= Rp. 27,000.00
= Rp. 2,169,000.00
= Rp. 13,799,500.00
= Rp. 13,799,500.00

= Rp. 460,000.00
= Rp. 700.00
= Rp. 460,700.00
= Rp. 21,000.00
= Rp. 94,500.00
= Rp. 9,450.00
= Rp. 1,620.00
= Rp. 126,570.00
= Rp. 587,270.00
= Rp. 587,270.00

= Rp. 726,978.00
= Rp. 7,000.00
= Rp. 733,978.00
= Rp. 60,000.00
= Rp. 270,000.00
= Rp. 27,000.00
= Rp. 4,500.00
= Rp. 361,500.00
= Rp. 1,095,478.00
= Rp. 1,095,470.00

= Rp. 460,000.00
= Rp. 7,000.00
= Rp. 467,000.00
= Rp. 60,000.00
= Rp. 270,000.00
= Rp. 27,000.00
= Rp. 4,500.00
= Rp. 361,500.00
= Rp. 828,500.00
= Rp. 828,500.00
= Rp. 436,186.80
= Rp. 4,200.00
= Rp. 440,386.80
= Rp. 48,000.00
= Rp. 216,000.00
= Rp. 21,600.00
= Rp. 3,600.00
= Rp. 289,200.00
= Rp. 729,586.80
= Rp. 729,580.00

= Rp. 276,000.00
= Rp. 4,200.00
= Rp. 280,200.00
= Rp. 48,000.00
= Rp. 216,000.00
= Rp. 21,600.00
= Rp. 3,600.00
= Rp. 289,200.00
= Rp. 569,400.00
= Rp. 569,400.00

= Rp. 1,163,164.80
= Rp. 14,375.00
= Rp. 1,177,539.80
= Rp. 60,000.00
= Rp. 270,000.00
= Rp. 27,000.00
= Rp. 4,500.00
= Rp. 361,500.00
= Rp. 1,539,039.80
= Rp. 1,539,030.00

= Rp. 736,000.00
= Rp. 14,375.00
= Rp. 750,375.00
= Rp. 60,000.00
= Rp. 270,000.00
= Rp. 27,000.00
= Rp. 4,500.00
= Rp. 361,500.00
= Rp. 1,111,875.00
= Rp. 1,111,870.00
wood) rangkap, rangka tertutup kayu kamper (lebar sampai 90 cm)

= Rp. 287,500.00
= Rp. 356.25
= Rp. 14,375.00
= Rp. 77,625.00
= Rp. 379,856.25
= Rp. 42,000.00
= Rp. 189,000.00
= Rp. 18,900.00
= Rp. 3,150.00
= Rp. 253,050.00
= Rp. 632,906.25
= Rp. 632,900.00
= Rp. 465,265.92
= Rp. 356.25
= Rp. 14,375.00
= Rp. 77,625.00
= Rp. 557,622.17
= Rp. 48,000.00
= Rp. 216,000.00
= Rp. 21,600.00
= Rp. 3,600.00
= Rp. 289,200.00
= Rp. 846,822.17
= Rp. 846,820.00

= Rp. 294,400.00
= Rp. 356.25
= Rp. 14,375.00
= Rp. 77,625.00
= Rp. 386,756.25
= Rp. 48,000.00
= Rp. 216,000.00
= Rp. 21,600.00
= Rp. 3,600.00
= Rp. 289,200.00
= Rp. 675,956.25
= Rp. 675,950.00

= Rp. 842,649.00
= Rp. 1,781.25
= Rp. 844,430.25
= Rp. 40,200.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 30,150.00
= Rp. 268,350.00
= Rp. 1,112,780.25
= Rp. 1,112,780.00

= Rp. 431,250.00
= Rp. 1,781.25
= Rp. 433,031.25
= Rp. 40,200.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 30,150.00
= Rp. 268,350.00
= Rp. 701,381.25
= Rp. 701,380.00

= Rp. 1,050,000.00
= Rp. 1,781.25
= Rp. 1,051,781.25
= Rp. 40,200.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 30,150.00
= Rp. 268,350.00
= Rp. 1,320,131.25
= Rp. 1,320,130.00

= Rp. 179,687.50
= Rp. 356.25
= Rp. 8,625.00
= Rp. 123,625.00
= Rp. 312,293.75
= Rp. 48,000.00
= Rp. 216,000.00
= Rp. 21,600.00
= Rp. 3,600.00
= Rp. 289,200.00
= Rp. 601,493.75
= Rp. 601,490.00

= Rp. 8,728,500.00
= Rp. 306,750.00
= Rp. 47,320.00
= Rp. 9,082,570.00
= Rp. 240,000.00
= Rp. 1,080,000.00
= Rp. 108,000.00
= Rp. 18,000.00
= Rp. 1,446,000.00
= Rp. 10,528,570.00
= Rp. 10,528,570.00

= Rp. 22,801,440.00
= Rp. 306,750.00
= Rp. 47,320.00
= Rp. 23,155,510.00
= Rp. 402,000.00
= Rp. 1,800,900.00
= Rp. 180,900.00
= Rp. 30,150.00
= Rp. 2,413,950.00
= Rp. 25,569,460.00
= Rp. 25,569,460.00

= Rp. 6,325,000.00
= Rp. 306,750.00
= Rp. 25,350.00
= Rp. 6,657,100.00
= Rp. 402,000.00
= Rp. 1,809,000.00
= Rp. 180,900.00
= Rp. 30,150.00
= Rp. 2,422,050.00
= Rp. 9,079,150.00
= Rp. 9,079,150.00

= Rp. 8,728,500.00
= Rp. 306,750.00
= Rp. 25,350.00
= Rp. 9,060,600.00
= Rp. 402,000.00
= Rp. 1,809,000.00
= Rp. 180,900.00
= Rp. 30,150.00
= Rp. 2,422,050.00
= Rp. 11,482,650.00
= Rp. 11,482,650.00

= Rp. 84,525.00
= Rp. 258,750.00
= Rp. 3,500.00
= Rp. 346,775.00
= Rp. 6,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 16,350.00
= Rp. 363,125.00
= Rp. 363,120.00

= Rp. 84,525.00
= Rp. 409,687.50
= Rp. 3,500.00
= Rp. 497,712.50
= Rp. 6,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 16,350.00
= Rp. 514,062.50
= Rp. 514,060.00

= Rp. 111,090.00
= Rp. 798.00
= Rp. 111,888.00
= Rp. 7,200.00
= Rp. 10,800.00
= Rp. 1,080.00
= Rp. 540.00
= Rp. 19,620.00
= Rp. 131,508.00
= Rp. 131,500.00

= Rp. 75,267.50
= Rp. 2,800.00
= Rp. 78,067.50
= Rp. 9,000.00
= Rp. 27,000.00
= Rp. 2,700.00
= Rp. 6,750.00
= Rp. 45,450.00
= Rp. 123,517.50
= Rp. 123,510.00
= Rp. 79,666.25
= Rp. 3,500.00
= Rp. 83,166.25
= Rp. 12,000.00
= Rp. 27,000.00
= Rp. 2,700.00
= Rp. 900.00
= Rp. 42,600.00
= Rp. 125,766.25
= Rp. 125,760.00

= Rp. 124,200.00
= Rp. 1,400.00
= Rp. 125,600.00
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 151,850.00
= Rp. 151,850.00

= Rp. 124,200.00
= Rp. 1,400.00
= Rp. 125,600.00
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 151,850.00
= Rp. 151,850.00

= Rp. 70,173.00
= Rp. 1,400.00
= Rp. 71,573.00
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 97,823.00
= Rp. 97,820.00

= Rp. 126,500.00
= Rp. 700.00
= Rp. 127,200.00
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 153,450.00
= Rp. 153,450.00
= Rp. 71,472.50
= Rp. 700.00
= Rp. 72,172.50
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 98,422.50
= Rp. 98,420.00

= Rp. 161,000.00
= Rp. 2,100.00
= Rp. 163,100.00
= Rp. 9,000.00
= Rp. 40,500.00
= Rp. 4,050.00
= Rp. 720.00
= Rp. 54,270.00
= Rp. 217,370.00
= Rp. 217,370.00

= Rp. 161,000.00
= Rp. 2,100.00
= Rp. 106,317.50
= Rp. 16,100.00
= Rp. 285,517.50
= Rp. 9,000.00
= Rp. 40,500.00
= Rp. 4,050.00
= Rp. 720.00
= Rp. 54,270.00
= Rp. 339,787.50
= Rp. 339,780.00

= Rp. 161,000.00
= Rp. 2,100.00
= Rp. 106,317.50
= Rp. 16,100.00
= Rp. 285,517.50
= Rp. 12,000.00
= Rp. 54,000.00
= Rp. 5,400.00
= Rp. 900.00
= Rp. 72,300.00
= Rp. 357,817.50
= Rp. 357,810.00

= Rp. 52,785.00
= Rp. 25,875.00
= Rp. 350.00
= Rp. 79,010.00
= Rp. 9,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 19,350.00
= Rp. 98,360.00
= Rp. 98,360.00

= Rp. 25,990.00
= Rp. 237.50
= Rp. 26,227.50
= Rp. 1,680.00
= Rp. 7,200.00
= Rp. 720.00
= Rp. 126.00
= Rp. 9,726.00
= Rp. 35,953.50
= Rp. 35,950.00

= Rp. 28,910.43
= Rp. 4,657.50
= Rp. 1,187.50
= Rp. 34,755.43
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 61,005.43
= Rp. 61,000.00

= Rp. 300,437.50
= Rp. 300,437.50
= Rp. 12,384.00
= Rp. 18,576.00
= Rp. 1,857.60
= Rp. 907.20
= Rp. 33,724.80
= Rp. 334,162.30
= Rp. 334,160.00

KERJAAN PENUTUP LANTAI DAN DINDING

= Rp. 52,875.45
= Rp. 13,700.00
= Rp. 8,325.00
= Rp. 74,900.45
= Rp. 15,000.00
= Rp. 8,750.00
= Rp. 1,170.00
= Rp. 1,170.00
= Rp. 26,090.00
= Rp. 100,990.45
= Rp. 100,990.00

= Rp. 54,116.41
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 75,867.41
= Rp. 15,000.00
= Rp. 8,750.00
= Rp. 1,170.00
= Rp. 1,170.00
= Rp. 26,090.00
= Rp. 101,957.41
= Rp. 101,950.00

= Rp. 54,116.41
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 75,867.41
= Rp. 15,000.00
= Rp. 8,750.00
= Rp. 1,170.00
= Rp. 1,170.00
= Rp. 26,090.00
= Rp. 101,957.41
= Rp. 101,950.00

= Rp. 49,502.00
= Rp. 14,248.00
= Rp. 8,325.00
= Rp. 12,650.00
= Rp. 84,725.00
= Rp. 16,200.00
= Rp. 9,450.00
= Rp. 1,260.00
= Rp. 1,260.00
= Rp. 28,170.00
= Rp. 112,895.00
= Rp. 112,890.00

= Rp. 52,875.45
= Rp. 13,700.00
= Rp. 8,325.00
= Rp. 18,975.00
= Rp. 93,875.45
= Rp. 15,600.00
= Rp. 9,100.00
= Rp. 1,170.00
= Rp. 1,170.00
= Rp. 27,040.00
= Rp. 120,915.45
= Rp. 120,910.00

= Rp. 60,738.00
= Rp. 14,248.00
= Rp. 8,325.00
= Rp. 20,493.00
= Rp. 103,804.00
= Rp. 16,200.00
= Rp. 9,450.00
= Rp. 1,260.00
= Rp. 1,260.00
= Rp. 28,170.00
= Rp. 131,974.00
= Rp. 131,970.00

= Rp. 41,711.00
= Rp. 14,248.00
= Rp. 8,325.00
= Rp. 64,284.00
= Rp. 16,200.00
= Rp. 9,450.00
= Rp. 1,260.00
= Rp. 1,260.00
= Rp. 28,170.00
= Rp. 92,454.00

= Rp. 77,115.00
= Rp. 11,220.30
= Rp. 8,325.00
= Rp. 34,787.50
= Rp. 131,447.80
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 204,247.80
= Rp. 204,240.00

= Rp. 49,350.00
= Rp. 13,700.00
= Rp. 8,325.00
= Rp. 6,325.00
= Rp. 77,700.00
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 150,500.00
= Rp. 150,500.00

= Rp. 51,450.00
= Rp. 13,700.00
= Rp. 8,325.00
= Rp. 6,325.00
= Rp. 79,800.00
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 152,600.00
= Rp. 152,600.00
= Rp. 55,532.88
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 16,445.00
= Rp. 93,728.88
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 166,528.88
= Rp. 166,520.00

= Rp. 60,253.44
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 16,445.00
= Rp. 98,449.44
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 171,249.44
= Rp. 171,240.00

= Rp. 2,226.00
= Rp. 14,248.00
= Rp. 8,325.00
= Rp. 6,325.00
= Rp. 31,124.00
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 103,924.00
= Rp. 103,920.00

= Rp. 2,583.00
= Rp. 14,248.00
= Rp. 8,325.00
= Rp. 6,325.00
= Rp. 31,481.00
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 104,281.00
= Rp. 104,280.00

= Rp. 7,711.50
= Rp. 1,561.80
= Rp. 555.00
= Rp. 316.25
= Rp. 10,144.55
= Rp. 5,400.00
= Rp. 6,300.00
= Rp. 3,150.00
= Rp. 450.00
= Rp. 15,300.00
= Rp. 25,444.55
= Rp. 25,440.00

= Rp. 11,040.00
= Rp. 156.18
= Rp. 185.00
= Rp. 63.25
= Rp. 11,444.43
= Rp. 5,400.00
= Rp. 6,300.00
= Rp. 810.00
= Rp. 450.00
= Rp. 12,960.00
= Rp. 24,404.43
= Rp. 24,400.00

= Rp. 20,328.00
= Rp. 10,062.50
= Rp. 30,390.50
= Rp. 10,200.00
= Rp. 15,300.00
= Rp. 1,530.00
= Rp. 810.00
= Rp. 27,840.00
= Rp. 58,230.50
= Rp. 58,230.00

= Rp. 381,663.45
= Rp. 17,250.00
= Rp. 398,913.45
= Rp. 42,000.00
= Rp. 31,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 79,800.00
= Rp. 478,713.45
= Rp. 478,710.00

= Rp. 472,500.00
= Rp. 17,250.00
= Rp. 489,750.00
= Rp. 42,000.00
= Rp. 31,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 79,800.00
= Rp. 569,550.00
= Rp. 569,550.00
= Rp. 55,125.00
= Rp. 10,062.50
= Rp. 65,187.50
= Rp. 7,200.00
= Rp. 10,800.00
= Rp. 1,080.00
= Rp. 540.00
= Rp. 19,620.00
= Rp. 84,807.50
= Rp. 84,800.00

= Rp. 624.88
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 6,325.00
= Rp. 23,020.88
= Rp. 60,000.00
= Rp. 35,000.00
= Rp. 4,500.00
= Rp. 4,500.00
= Rp. 104,000.00
= Rp. 127,020.88
= Rp. 127,020.00

= Rp. 77,115.00
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 34,787.50
= Rp. 127,973.50
= Rp. 54,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 4,050.00
= Rp. 93,600.00
= Rp. 221,573.50
= Rp. 221,570.00

= Rp. 67,500.00
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 34,787.50
= Rp. 118,358.50
= Rp. 54,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 4,050.00
= Rp. 93,600.00
= Rp. 211,958.50
= Rp. 211,950.00

= Rp. 75,000.00
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 34,787.50
= Rp. 125,858.50
= Rp. 54,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 4,050.00
= Rp. 93,600.00
= Rp. 219,458.50
= Rp. 219,450.00

= Rp. 56,180.00
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 24,541.00
= Rp. 96,792.00
= Rp. 54,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 4,050.00
= Rp. 93,600.00
= Rp. 190,392.00
= Rp. 190,390.00

= Rp. 65,190.00
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 24,541.00
= Rp. 105,802.00
= Rp. 54,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 4,050.00
= Rp. 93,600.00
= Rp. 199,402.00
= Rp. 199,400.00

= Rp. 119,955.00
= Rp. 16,097.50
= Rp. 6,475.00
= Rp. 142,527.50
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 215,327.50
= Rp. 215,320.00

= Rp. 163,900.00
= Rp. 16,097.50
= Rp. 6,475.00
= Rp. 186,472.50
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 259,272.50
= Rp. 259,270.00

= Rp. 120,175.00
= Rp. 16,097.50
= Rp. 6,475.00
= Rp. 142,747.50
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 215,547.50
= Rp. 215,540.00

= Rp. 240,562.50
= Rp. 6,850.00
= Rp. 4,625.00
= Rp. 252,037.50
= Rp. 14,400.00
= Rp. 8,400.00
= Rp. 1,080.00
= Rp. 2,160.00
= Rp. 26,040.00
= Rp. 278,077.50
= Rp. 278,070.00

= Rp. 4,499.00
= Rp. 7,187.50
= Rp. 11,686.50
= Rp. 21,000.00
= Rp. 15,750.00
= Rp. 1,530.00
= Rp. 180.00
= Rp. 38,460.00
= Rp. 50,146.50
= Rp. 50,140.00

= Rp. 49,500.00
= Rp. 555.00
= Rp. 316.25
= Rp. 50,371.25
= Rp. 2,700.00
= Rp. 3,150.00
= Rp. 450.00
= Rp. 450.00
= Rp. 6,750.00
= Rp. 57,121.25
= Rp. 57,120.00

= Rp. 150,910.86
= Rp. 13,700.00
= Rp. 18,975.00
= Rp. 8,325.00
= Rp. 191,910.86
= Rp. 15,600.00
= Rp. 9,100.00
= Rp. 1,170.00
= Rp. 1,170.00
= Rp. 27,040.00
= Rp. 218,950.86
= Rp. 218,950.00

= Rp. 174,307.29
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 16,445.00
= Rp. 212,503.29
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 285,303.29
= Rp. 285,300.00

= Rp. 470,142.36
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 16,445.00
= Rp. 508,338.36
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 581,138.36
= Rp. 581,130.00

= Rp. 191,296.88
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 16,445.00
= Rp. 229,492.88
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 302,292.88
= Rp. 302,290.00

= Rp. 330,750.00
= Rp. 17,042.80
= Rp. 4,625.00
= Rp. 8,222.50
= Rp. 360,640.30
= Rp. 78,000.00
= Rp. 45,500.00
= Rp. 5,850.00
= Rp. 5,850.00
= Rp. 135,200.00
= Rp. 495,840.30
= Rp. 495,840.00

= Rp. 43,725.00
= Rp. 205.00
= Rp. 43,930.00
= Rp. 1,800.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 360.00
= Rp. 9,090.00
= Rp. 53,020.00
= Rp. 53,020.00

= Rp. 56,320.00
= Rp. 205.00
= Rp. 56,525.00
= Rp. 1,800.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 360.00
= Rp. 9,090.00
= Rp. 65,615.00
= Rp. 65,610.00

= Rp. 63,635.00
= Rp. 205.00
= Rp. 63,840.00
= Rp. 1,800.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 360.00
= Rp. 9,090.00
= Rp. 72,930.00
= Rp. 72,930.00

= Rp. 23,503.13
= Rp. 362.25
= Rp. 23,865.38
= Rp. 6,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 16,350.00
= Rp. 40,215.38
= Rp. 40,210.00

= Rp. 35,057.75
= Rp. 2,213.75
= Rp. 37,271.50
= Rp. 6,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 450.00
= Rp. 11,400.00
= Rp. 48,671.50
= Rp. 48,670.00

= Rp. 20,511.40
= Rp. 2,213.75
= Rp. 22,725.15
= Rp. 6,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 450.00
= Rp. 11,400.00
= Rp. 34,125.15
= Rp. 34,120.00

= Rp. 272,616.75
= Rp. 120.75
= Rp. 272,737.50
= Rp. 48,000.00
= Rp. 72,000.00
= Rp. 7,200.00
= Rp. 3,600.00
= Rp. 130,800.00
= Rp. 403,537.50
= Rp. 403,530.00

= Rp. 28,376.25
= Rp. 21.56
= Rp. 28,397.81
= Rp. 3,600.00
= Rp. 5,400.00
= Rp. 540.00
= Rp. 270.00
= Rp. 9,810.00
= Rp. 38,207.81
= Rp. 38,200.00

= Rp. 25,462.50
= Rp. 21.56
= Rp. 25,484.06
= Rp. 3,600.00
= Rp. 5,400.00
= Rp. 540.00
= Rp. 270.00
= Rp. 9,810.00
= Rp. 35,294.06
= Rp. 35,290.00

= Rp. 13,545.00
= Rp. 212.00
= Rp. 13,757.00
= Rp. 3,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 270.00
= Rp. 8,220.00
= Rp. 21,977.00
= Rp. 21,970.00

= Rp. 17,710.00
= Rp. 120.75
= Rp. 17,830.75
= Rp. 1,800.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 360.00
= Rp. 9,090.00
= Rp. 26,920.75
= Rp. 26,920.00

= Rp. 14,605.00
= Rp. 14,605.00
= Rp. 3,600.00
= Rp. 4,500.00
= Rp. 480.00
= Rp. 270.00
= Rp. 8,850.00
= Rp. 23,455.00
= Rp. 23,450.00

= Rp. 18,400.00
= Rp. 18,400.00
= Rp. 3,600.00
= Rp. 4,500.00
= Rp. 480.00
= Rp. 270.00
= Rp. 8,850.00
= Rp. 27,250.00
= Rp. 27,250.00

= Rp. 19,435.00
= Rp. 19,435.00
= Rp. 3,600.00
= Rp. 4,500.00
= Rp. 480.00
= Rp. 270.00
= Rp. 8,850.00
= Rp. 28,285.00
= Rp. 28,280.00

= Rp. 8,500.00
= Rp. 3,400.00
= Rp. 11,900.00
= Rp. 6,000.00
= Rp. 8,000.00
= Rp. 90.00
= Rp. 450.00
= Rp. 14,540.00
= Rp. 322.40
= Rp. 322.40
= Rp. 26,762.40
= Rp. 26,760.00

= Rp. 190,500.00
= Rp. 633,040.00
= Rp. 1,523.75
= Rp. 825,063.75
= Rp. 63,000.00
= Rp. 84,000.00
= Rp. 9,450.00
= Rp. 4,680.00
= Rp. 161,130.00
= Rp. 986,193.75
= Rp. 986,190.00

= Rp. 12,190.00
= Rp. 2,550.00
= Rp. 1,360.00
= Rp. 16,100.00
= Rp. 2,400.00
= Rp. 1,600.00
= Rp. 180.00
= Rp. 180.00
= Rp. 4,360.00
= Rp. 6,851.00
= Rp. 6,851.00
= Rp. 27,311.00
= Rp. 27,310.00

= Rp. 151,800.00
= Rp. 300.00
= Rp. 1,932.00
= Rp. 154,032.00
= Rp. 2,580.00
= Rp. 3,225.00
= Rp. 344.00
= Rp. 189.00
= Rp. 6,338.00
= Rp. 160,370.00
= Rp. 160,370.00

= Rp. 136,290.00
= Rp. 300.00
= Rp. 1,932.00
= Rp. 138,522.00
= Rp. 2,580.00
= Rp. 3,225.00
= Rp. 344.00
= Rp. 189.00
= Rp. 6,338.00
= Rp. 144,860.00
= Rp. 144,860.00

= Rp. 124,960.00
= Rp. 300.00
= Rp. 1,932.00
= Rp. 127,192.00
= Rp. 2,580.00
= Rp. 3,225.00
= Rp. 344.00
= Rp. 189.00
= Rp. 6,338.00
= Rp. 133,530.00
= Rp. 133,530.00

= Rp. 459,580.00
= Rp. 450,410.00
= Rp. 909,990.00
= Rp. 5,100.00
= Rp. 6,375.00
= Rp. 680.00
= Rp. 378.00
= Rp. 12,533.00
= Rp. 922,523.00
= Rp. 922,520.00

= Rp. 727,100.00
= Rp. 36,225.00
= Rp. 8,694.00
= Rp. 772,019.00
= Rp. 5,100.00
= Rp. 6,375.00
= Rp. 720.00
= Rp. 450.00
= Rp. 12,645.00
= Rp. 784,664.00
= Rp. 784,660.00

= Rp. 680,900.00
= Rp. 36,225.00
= Rp. 8,694.00
= Rp. 725,819.00
= Rp. 5,100.00
= Rp. 6,375.00
= Rp. 720.00
= Rp. 450.00
= Rp. 12,645.00
= Rp. 738,464.00
= Rp. 738,460.00

= Rp. 459,580.00
= Rp. 36,225.00
= Rp. 8,694.00
= Rp. 504,499.00
= Rp. 5,100.00
= Rp. 6,375.00
= Rp. 720.00
= Rp. 450.00
= Rp. 12,645.00
= Rp. 517,144.00
= Rp. 517,140.00

= Rp. 119,216.10
= Rp. 64,992.00
= Rp. 184,208.10
= Rp. 100,200.00
= Rp. 125,250.00
= Rp. 13,360.00
= Rp. 7,470.00
= Rp. 246,280.00
= Rp. 430,488.10
= Rp. 430,480.00

= Rp. 22,137.50
= Rp. 26,664.00
= Rp. 33,118.80
= Rp. 81,920.30
= Rp. 6,000.00
= Rp. 7,500.00
= Rp. 800.00
= Rp. 450.00
= Rp. 14,750.00
= Rp. 96,670.30
= Rp. 96,670.00

= Rp. 8,305.00
= Rp. 1,500.00
= Rp. 71,750.00
= Rp. 81,555.00
= Rp. 12,000.00
= Rp. 16,000.00
= Rp. 1,800.00
= Rp. 90.00
= Rp. 29,890.00
= Rp. 111,445.00
= Rp. 111,440.00

= Rp. 87,543.75
= Rp. 307.50
= Rp. 92,862.50
= Rp. 180,713.75
= Rp. 12,000.00
= Rp. 16,000.00
= Rp. 1,800.00
= Rp. 900.00
= Rp. 30,700.00
= Rp. 211,413.75
= Rp. 211,410.00
= Rp. 16,905.00
= Rp. 205.00
= Rp. 5,125.00
= Rp. 22,235.00
= Rp. 9,000.00
= Rp. 24,000.00
= Rp. 2,700.00
= Rp. 720.00
= Rp. 36,420.00
= Rp. 58,655.00
= Rp. 58,650.00

= Rp. 52,500.00
= Rp. 52,500.00
= Rp. 9,000.00
= Rp. 6,750.00
= Rp. 675.00
= Rp. 720.00
= Rp. 17,145.00
= Rp. 69,645.00
= Rp. 69,640.00

= Rp. 31,250.00
= Rp. 31,250.00
= Rp. 9,000.00
= Rp. 6,750.00
= Rp. 720.00
= Rp. 720.00
= Rp. 17,190.00
= Rp. 48,440.00
= Rp. 48,440.00

= Rp. 38,750.00
= Rp. 38,750.00
= Rp. 9,000.00
= Rp. 6,750.00
= Rp. 720.00
= Rp. 720.00
= Rp. 17,190.00
= Rp. 55,940.00
= Rp. 55,940.00

= Rp. 83,750.00
= Rp. 83,750.00
= Rp. 9,000.00
= Rp. 6,750.00
= Rp. 720.00
= Rp. 720.00
= Rp. 17,190.00
= Rp. 100,940.00
= Rp. 100,940.00
= Rp. 57,750.00
= Rp. 356.25
= Rp. 57,750.00
= Rp. 12,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 900.00
= Rp. 22,800.00
= Rp. 80,550.00
= Rp. 80,550.00

= Rp. 99,618.75
= Rp. 1,700.00
= Rp. 101,318.75
= Rp. 9,000.00
= Rp. 6,750.00
= Rp. 7,200.00
= Rp. 540.00
= Rp. 23,490.00
= Rp. 124,808.75
= Rp. 124,800.00

= Rp. 99,705.00
= Rp. 1,700.00
= Rp. 101,405.00
= Rp. 12,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 90.00
= Rp. 21,990.00
= Rp. 123,395.00
= Rp. 123,390.00

= Rp. 93,840.00
= Rp. 1,700.00
= Rp. 95,540.00
= Rp. 12,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 90.00
= Rp. 21,990.00
= Rp. 117,530.00
= Rp. 117,530.00

= Rp. #N/A
= Rp. 1,700.00
= Rp. #N/A
= Rp. 12,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 90.00
= Rp. 21,990.00
= Rp. #N/A
= Rp. #N/A
= Rp. #N/A
= Rp. 1,700.00
= Rp. #N/A
= Rp. 12,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 90.00
= Rp. 21,990.00
= Rp. #N/A
= Rp. #N/A

= Rp. #N/A
= Rp. 1,700.00
= Rp. #N/A
= Rp. 9,960.00
= Rp. 22,500.00
= Rp. 2,250.00
= Rp. 720.00
= Rp. 35,430.00
= Rp. #N/A
= Rp. #N/A

= Rp. 53,000.00
= Rp. 10,960.00
= Rp. 5,920.00
= Rp. 69,880.00
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 180.00
= Rp. 43,980.00
= Rp. 113,860.00
= Rp. 113,860.00

= Rp. 17,250.00
= Rp. 10,960.00
= Rp. 5,920.00
= Rp. 34,130.00
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 180.00
= Rp. 43,980.00
= Rp. 78,110.00
= Rp. 78,110.00

= Rp. 34,000.00
= Rp. 10,960.00
= Rp. 5,920.00
= Rp. 50,880.00
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 180.00
= Rp. 43,980.00
= Rp. 94,860.00
= Rp. 94,860.00

= Rp. 37,250.00
= Rp. 10,960.00
= Rp. 5,920.00
= Rp. 54,130.00
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 180.00
= Rp. 43,980.00
= Rp. 98,110.00
= Rp. 98,110.00

= Rp. 40,250.00
= Rp. 1,006.25
= Rp. 14,796.00
= Rp. 5,920.00
= Rp. 12,650.00
= Rp. 74,622.25
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 180.00
= Rp. 43,980.00
= Rp. 118,602.25
= Rp. 118,600.00

= Rp. 36,685.00
= Rp. 425.00
= Rp. 37,110.00
= Rp. 15,000.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 1,170.00
= Rp. 31,020.00
= Rp. 68,130.00
= Rp. 68,130.00

= Rp. 27,597.50
= Rp. 2,682.00
= Rp. 30,279.50
= Rp. 8,400.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 630.00
= Rp. 15,960.00
= Rp. 46,239.50
= Rp. 46,230.00

= Rp. 63,250.00
= Rp. 2,682.00
= Rp. 65,932.00
= Rp. 8,400.00
= Rp. 6,750.00
= Rp. 720.00
= Rp. 720.00
= Rp. 16,590.00
= Rp. 82,522.00
= Rp. 82,520.00

= Rp. 35,910.00
= Rp. 3,000.00
= Rp. 38,910.00
= Rp. 5,040.00
= Rp. 11,250.00
= Rp. 1,170.00
= Rp. 360.00
= Rp. 17,820.00
= Rp. 56,730.00
= Rp. 56,730.00

= Rp. 47,897.50
= Rp. 410.00
= Rp. 48,307.50
= Rp. 7,200.00
= Rp. 5,400.00
= Rp. 540.00
= Rp. 540.00
= Rp. 13,680.00
= Rp. 61,987.50
= Rp. 61,980.00

= Rp. 8,625.00
= Rp. 820.00
= Rp. 9,445.00
= Rp. 9,000.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 540.00
= Rp. 16,470.00
= Rp. 25,915.00
= Rp. 25,910.00

= Rp. 40,250.00
= Rp. 1,025.00
= Rp. 14,796.00
= Rp. 5,920.00
= Rp. 12,650.00
= Rp. 74,641.00
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 1,800.00
= Rp. 45,600.00
= Rp. 120,241.00
= Rp. 120,240.00
= Rp. 34,155.00
= Rp. 10,250.00
= Rp. 44,405.00
= Rp. 15,000.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 1,170.00
= Rp. 31,020.00
= Rp. 75,425.00
= Rp. 75,420.00

= Rp. 115,500.00
= Rp. 2,460.00
= Rp. 117,960.00
= Rp. 8,400.00
= Rp. 6,030.00
= Rp. 630.00
= Rp. 630.00
= Rp. 15,690.00
= Rp. 133,650.00
= Rp. 133,650.00

= Rp. 168,000.00
= Rp. 2,460.00
= Rp. 170,460.00
= Rp. 8,400.00
= Rp. 6,030.00
= Rp. 630.00
= Rp. 630.00
= Rp. 15,690.00
= Rp. 186,150.00
= Rp. 186,150.00

= Rp. 291,600.00
= Rp. 1,025.00
= Rp. 292,625.00
= Rp. 8,400.00
= Rp. 6,030.00
= Rp. 630.00
= Rp. 630.00
= Rp. 15,690.00
= Rp. 308,315.00
= Rp. 308,310.00

= Rp. 1,380,000.00
= Rp. 82,800.00
= Rp. 1,462,800.00
= Rp. 198,000.00
= Rp. 77,000.00
= Rp. 800.00
= Rp. 14,400.00
= Rp. 290,200.00
= Rp. 1,753,000.00
= Rp. 1,753,000.00
= Rp. 2,518,500.00
= Rp. 151,110.00
= Rp. 2,669,610.00
= Rp. 198,000.00
= Rp. 77,000.00
= Rp. 800.00
= Rp. 14,400.00
= Rp. 290,200.00
= Rp. 2,959,810.00
= Rp. 2,959,810.00

= Rp. 116,550.00
= Rp. 8,220.00
= Rp. 1,850.00
= Rp. 126,620.00
= Rp. 60,000.00
= Rp. 105,000.00
= Rp. 12,000.00
= Rp. 14,400.00
= Rp. 191,400.00
= Rp. 318,020.00
= Rp. 318,020.00

= Rp. 1,725,000.00
= Rp. 517,500.00
= Rp. 8,220.00
= Rp. 1,850.00
= Rp. 2,252,570.00
= Rp. 60,000.00
= Rp. 70,000.00
= Rp. 8,000.00
= Rp. 4,500.00
= Rp. 142,500.00
= Rp. 2,395,070.00
= Rp. 2,395,070.00

= Rp. 3,680,000.00
= Rp. 1,104,000.00
= Rp. 8,220.00
= Rp. 1,850.00
= Rp. 4,794,070.00
= Rp. 60,000.00
= Rp. 70,000.00
= Rp. 8,000.00
= Rp. 4,500.00
= Rp. 142,500.00
= Rp. 4,936,570.00
= Rp. 4,936,570.00

= Rp. 602,400.00
= Rp. 150,600.00
= Rp. 8,220.00
= Rp. 1,850.00
= Rp. 763,070.00
= Rp. 72,000.00
= Rp. 101,500.00
= Rp. 12,000.00
= Rp. 5,400.00
= Rp. 190,900.00
= Rp. 953,970.00
= Rp. 953,970.00

= Rp. 770,500.00
= Rp. 92,460.00

= Rp. 862,960.00
= Rp. 18,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 1,350.00
= Rp. 54,900.00
= Rp. 917,860.00
= Rp. 917,860.00

= Rp. 112,500.00
= Rp. 164,400.00
= Rp. 55,500.00
= Rp. 195,200.00
= Rp. 75,900.00
= Rp. 603,500.00
= Rp. 360,000.00
= Rp. 210,000.00
= Rp. 27,000.00
= Rp. 2,700.00
= Rp. 599,700.00
= Rp. 1,203,200.00
= Rp. 1,203,200.00

= Rp. 287,500.00
= Rp. 38,600.00
= Rp. 326,100.00
= Rp. 1,800.00
= Rp. 21,000.00
= Rp. 2,700.00
= Rp. 1,350.00
= Rp. 26,850.00
= Rp. 352,950.00
= Rp. 352,950.00

= Rp. 25,740.00
= Rp. 10,044.64
= Rp. 5,370.40
= Rp. 10,360.00
= Rp. 90.00
= Rp. 51,605.04
= Rp. 8,400.00
= Rp. 4,900.00
= Rp. 630.00
= Rp. 630.00
= Rp. 14,560.00
= Rp. 66,165.04
= Rp. 66,160.00

= Rp. 37,290.00
= Rp. 10,044.64
= Rp. 5,370.40
= Rp. 10,360.00
= Rp. 90.00
= Rp. 63,155.04
= Rp. 8,400.00
= Rp. 4,900.00
= Rp. 630.00
= Rp. 630.00
= Rp. 14,560.00
= Rp. 77,715.04
= Rp. 77,710.00

= Rp. 46,750.00
= Rp. 204,613.10
= Rp. 14,111.00
= Rp. 11,285.00
= Rp. 258.75
= Rp. 277,017.85
= Rp. 22,800.00
= Rp. 13,300.00
= Rp. 1,710.00
= Rp. 1,710.00
= Rp. 39,520.00
= Rp. 316,537.85
= Rp. 316,530.00

= Rp. 51,260.00
= Rp. 204,613.10
= Rp. 14,111.00
= Rp. 11,285.00
= Rp. 258.75
= Rp. 281,527.85
= Rp. 22,800.00
= Rp. 13,300.00
= Rp. 1,710.00
= Rp. 1,710.00
= Rp. 39,520.00
= Rp. 321,047.85
= Rp. 321,040.00

= Rp. 63,030.00
= Rp. 204,613.10
= Rp. 14,111.00
= Rp. 11,285.00
= Rp. 258.75
= Rp. 293,297.85
= Rp. 22,800.00
= Rp. 13,300.00
= Rp. 1,710.00
= Rp. 1,710.00
= Rp. 39,520.00
= Rp. 332,817.85
= Rp. 332,810.00

= Rp. 30,000.00
= Rp. 60,280.00
= Rp. 12,950.00
= Rp. 18,200.00
= Rp. 16,000.00
= Rp. 300.00
= Rp. 137,730.00
= Rp. 129,600.00
= Rp. 50,400.00
= Rp. 6,480.00
= Rp. 990.00
= Rp. 187,470.00
= Rp. 325,200.00
= Rp. 325,200.00

= Rp. 52,500.00
= Rp. 105,490.00
= Rp. 24,050.00
= Rp. 5,200.00
= Rp. 26,000.00
= Rp. 450.00
= Rp. 213,690.00
= Rp. 192,000.00
= Rp. 80,500.00
= Rp. 990.00
= Rp. 1,440.00
= Rp. 274,930.00
= Rp. 488,620.00
= Rp. 488,620.00

= Rp. 92,250.00
= Rp. 156,180.00
= Rp. 34,040.00
= Rp. 8,580.00
= Rp. 48,500.00
= Rp. 600.00
= Rp. 340,150.00
= Rp. 192,000.00
= Rp. 80,500.00
= Rp. 990.00
= Rp. 1,440.00
= Rp. 274,930.00
= Rp. 615,080.00
= Rp. 615,080.00

= Rp. 26,250.00
= Rp. 7,656.25
= Rp. 33,906.25
= Rp. 3,240.00
= Rp. 6,300.00
= Rp. 720.00
= Rp. 2,430.00
= Rp. 12,690.00
= Rp. 46,596.25
= Rp. 46,590.00

= Rp. 31,470.00
= Rp. 9,178.75
= Rp. 40,648.75
= Rp. 3,240.00
= Rp. 6,300.00
= Rp. 720.00
= Rp. 2,430.00
= Rp. 12,690.00
= Rp. 53,338.75
= Rp. 53,330.00

= Rp. 47,250.00
= Rp. 13,781.25
= Rp. 61,031.25
= Rp. 3,240.00
= Rp. 6,300.00
= Rp. 720.00
= Rp. 2,430.00
= Rp. 12,690.00
= Rp. 73,721.25
= Rp. 73,720.00

= Rp. 103,190.00
= Rp. 30,097.08
= Rp. 133,287.08
= Rp. 6,480.00
= Rp. 12,600.00
= Rp. 1,440.00
= Rp. 486.00
= Rp. 21,006.00
= Rp. 154,293.08
= Rp. 154,290.00

= Rp. 69,970.00
= Rp. 20,407.92
= Rp. 90,377.92
= Rp. 6,480.00
= Rp. 12,600.00
= Rp. 1,440.00
= Rp. 486.00
= Rp. 21,006.00
= Rp. 111,383.92
= Rp. 111,380.00

= Rp. 169,252.00
= Rp. 49,365.17
= Rp. 218,617.17
= Rp. 8,100.00
= Rp. 15,750.00
= Rp. 1,840.00
= Rp. 630.00
= Rp. 26,320.00
= Rp. 244,937.17
= Rp. 244,930.00

= Rp. 247,726.00
= Rp. 72,253.42
= Rp. 319,979.42
= Rp. 8,100.00
= Rp. 15,750.00
= Rp. 1,840.00
= Rp. 630.00
= Rp. 26,320.00
= Rp. 346,299.42
= Rp. 346,290.00

= Rp. 8,625.00
= Rp. 2,515.63
= Rp. 11,140.63
= Rp. 2,160.00
= Rp. 4,200.00
= Rp. 480.00
= Rp. 162.00
= Rp. 7,002.00
= Rp. 18,142.63
= Rp. 18,140.00

= Rp. 10,920.00
= Rp. 3,185.00
= Rp. 14,105.00
= Rp. 2,160.00
= Rp. 4,200.00
= Rp. 480.00
= Rp. 162.00
= Rp. 7,002.00
= Rp. 21,107.00
= Rp. 21,100.00

= Rp. 13,570.00
= Rp. 3,957.92
= Rp. 17,527.92
= Rp. 2,160.00
= Rp. 4,200.00
= Rp. 480.00
= Rp. 162.00
= Rp. 7,002.00
= Rp. 24,529.92
= Rp. 24,520.00

= Rp. 25,162.00
= Rp. 7,338.92
= Rp. 32,500.92
= Rp. 3,240.00
= Rp. 6,300.00
= Rp. 720.00
= Rp. 270.00
= Rp. 10,530.00
= Rp. 43,030.92
= Rp. 43,030.00

= Rp. 37,260.00
= Rp. 10,867.50
= Rp. 48,127.50
= Rp. 3,240.00
= Rp. 6,300.00
= Rp. 720.00
= Rp. 270.00
= Rp. 10,530.00
= Rp. 58,657.50
= Rp. 58,650.00

= Rp. 68,701.00
= Rp. 20,037.79
= Rp. 88,738.79
= Rp. 4,860.00
= Rp. 9,450.00
= Rp. 1,080.00
= Rp. 360.00
= Rp. 15,750.00
= Rp. 104,488.79
= Rp. 104,480.00

= Rp. 100,510.00
= Rp. 29,315.42
= Rp. 129,825.42
= Rp. 4,860.00
= Rp. 9,450.00
= Rp. 1,080.00
= Rp. 360.00
= Rp. 15,750.00
= Rp. 145,575.42
= Rp. 145,570.00

= Rp. 202,860.00
= Rp. 59,167.50
= Rp. 262,027.50
= Rp. 4,860.00
= Rp. 9,450.00
= Rp. 1,080.00
= Rp. 360.00
= Rp. 15,750.00
= Rp. 277,777.50
= Rp. 277,770.00

= Rp. 308,400.00
= Rp. 89,950.00
= Rp. 398,350.00
= Rp. 4,860.00
= Rp. 9,450.00
= Rp. 1,080.00
= Rp. 360.00
= Rp. 15,750.00
= Rp. 414,100.00
= Rp. 414,100.00

= Rp. 427,800.00
= Rp. 124,775.00
= Rp. 552,575.00
= Rp. 4,860.00
= Rp. 9,450.00
= Rp. 1,080.00
= Rp. 360.00
= Rp. 15,750.00
= Rp. 568,325.00
= Rp. 568,320.00

= Rp. 21,500.00
= Rp. 2,700.00
= Rp. 24,200.00
= Rp. 600.00
= Rp. 28,000.00
= Rp. 3,200.00
= Rp. 450.00
= Rp. 32,250.00
= Rp. 56,450.00
= Rp. 56,450.00

= Rp. 22,050.00
= Rp. 2,700.00
= Rp. 24,750.00
= Rp. 600.00
= Rp. 28,000.00
= Rp. 3,200.00
= Rp. 450.00
= Rp. 32,250.00
= Rp. 57,000.00
= Rp. 57,000.00

= Rp. 52,350.00
= Rp. 2,700.00
= Rp. 55,050.00
= Rp. 600.00
= Rp. 28,000.00
= Rp. 3,200.00
= Rp. 450.00
= Rp. 32,250.00
= Rp. 87,300.00
= Rp. 87,300.00

= Rp. 56,250.00
= Rp. 2,700.00
= Rp. 58,950.00
= Rp. 600.00
= Rp. 7,000.00
= Rp. 800.00
= Rp. 450.00
= Rp. 8,850.00
= Rp. 67,800.00
= Rp. 67,800.00

= Rp. 92,000.00
= Rp. 500.00
= Rp. 92,500.00
= Rp. 600.00
= Rp. 7,000.00
= Rp. 800.00
= Rp. 450.00
= Rp. 8,850.00
= Rp. 101,350.00
= Rp. 101,350.00

= Rp. 175,375.00
= Rp. 175,375.00
= Rp. 600.00
= Rp. 7,000.00
= Rp. 800.00
= Rp. 450.00
= Rp. 8,850.00
= Rp. 184,225.00
= Rp. 184,220.00

= Rp. 85,000.00
= Rp. 2,700.00
= Rp. 87,700.00
= Rp. 600.00
= Rp. 7,000.00
= Rp. 800.00
= Rp. 450.00
= Rp. 8,850.00
= Rp. 96,550.00
= Rp. 96,550.00

= Rp. 143,750.00
= Rp. 2,700.00
= Rp. 146,450.00
= Rp. 600.00
= Rp. 7,000.00
= Rp. 800.00
= Rp. 450.00
= Rp. 8,850.00
= Rp. 155,300.00
= Rp. 155,300.00

= Rp. 287,500.00
= Rp. 38,600.00
= Rp. 326,100.00
= Rp. 1,800.00
= Rp. 21,000.00
= Rp. 2,400.00
= Rp. 1,350.00
= Rp. 26,550.00
= Rp. 352,650.00
= Rp. 352,650.00

= Rp. 51,000.00
= Rp. 51,000.00
= Rp. 600.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 50,550.00
= Rp. 101,550.00
= Rp. 101,550.00

= Rp. 57,500.00
= Rp. 57,500.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 270.00
= Rp. 50,070.00
= Rp. 107,570.00
= Rp. 107,570.00

= Rp. 66,125.00
= Rp. 66,125.00
= Rp. 600.00
= Rp. 45,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 46,950.00
= Rp. 113,075.00
= Rp. 113,070.00

= Rp. 49,450.00
= Rp. 49,450.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 270.00
= Rp. 50,070.00
= Rp. 99,520.00
= Rp. 99,520.00

= Rp. 186,875.00
= Rp. 186,875.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 450.00
= Rp. 22.50
= Rp. 45,772.50
= Rp. 232,647.50
= Rp. 232,640.00
= Rp. 1,700,000.00
= Rp. 1,700,000.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 450.00
= Rp. 22.50
= Rp. 45,772.50
= Rp. 1,745,772.50
= Rp. 1,745,770.00

= Rp. 700,000.00
= Rp. 700,000.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 450.00
= Rp. 22.50
= Rp. 45,772.50
= Rp. 745,772.50
= Rp. 745,770.00

= Rp. 550,000.00
= Rp. 550,000.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 450.00
= Rp. 22.50
= Rp. 45,772.50
= Rp. 595,772.50
= Rp. 595,770.00

= Rp. 33,500.00
= Rp. 33,500.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 67.50
= Rp. 15,817.50
= Rp. 49,317.50
= Rp. 49,310.00

= Rp. 20,000.00
= Rp. 20,000.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 67.50
= Rp. 15,817.50
= Rp. 35,817.50
= Rp. 35,810.00

= Rp. 15,525.00
= Rp. 15,525.00
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 45.00
= Rp. 25,845.00
= Rp. 41,370.00
= Rp. 41,370.00

= Rp. 51,650.00
= Rp. 51,650.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 67.50
= Rp. 15,817.50
= Rp. 67,467.50
= Rp. 67,460.00

= Rp. 15,850.00
= Rp. 15,850.00
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 45.00
= Rp. 10,545.00
= Rp. 26,395.00
= Rp. 26,390.00

= Rp. 23,575.00
= Rp. 23,575.00
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 45.00
= Rp. 10,545.00
= Rp. 34,120.00
= Rp. 34,120.00

= Rp. 12,937.50
= Rp. 12,937.50
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 45.00
= Rp. 10,545.00
= Rp. 23,482.50
= Rp. 23,480.00

= Rp. 18,975.00
= Rp. 18,975.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 720.00
= Rp. 16,470.00
= Rp. 35,445.00
= Rp. 35,440.00
= Rp. 24,725.00
= Rp. 24,725.00
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 45.00
= Rp. 10,545.00
= Rp. 35,270.00
= Rp. 35,270.00

= Rp. 26,650.00
= Rp. 26,650.00
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 45.00
= Rp. 10,545.00
= Rp. 37,195.00
= Rp. 37,190.00

= Rp. 10,000.00
= Rp. 10,000.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 720.00
= Rp. 16,470.00
= Rp. 26,470.00
= Rp. 26,470.00

= Rp. 172,500.00
= Rp. 172,500.00
= Rp. 3,000.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 225.00
= Rp. 52,725.00
= Rp. 225,225.00
= Rp. 225,220.00

= Rp. 66,125.00
= Rp. 66,125.00
= Rp. 1,200.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 90.00
= Rp. 21,090.00
= Rp. 87,215.00
= Rp. 87,210.00

= Rp. 46,000.00
= Rp. 46,000.00
= Rp. 3,000.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 225.00
= Rp. 52,725.00
= Rp. 98,725.00
= Rp. 98,720.00

= Rp. 51,750.00
= Rp. 51,750.00
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 10,950.00
= Rp. 62,700.00
= Rp. 62,700.00

= Rp. 94,655.00
= Rp. 94,655.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 72.00
= Rp. 15,822.00
= Rp. 110,477.00
= Rp. 110,470.00

= Rp. 94,655.00
= Rp. 1,610.00
= Rp. 96,265.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 72.00
= Rp. 15,822.00
= Rp. 112,087.00
= Rp. 112,080.00

= Rp. 118,992.50
= Rp. 118,992.50
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 67.50
= Rp. 15,817.50
= Rp. 134,810.00
= Rp. 134,810.00

= Rp. 115,500.00
= Rp. 115,500.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 720.00
= Rp. 16,470.00
= Rp. 131,970.00
= Rp. 131,970.00

= Rp. 1,567,500.00
= Rp. 1,567,500.00
= Rp. 1,500.00
= Rp. 22,500.00
= Rp. 2,250.00
= Rp. 117.00
= Rp. 26,367.00
= Rp. 1,593,867.00
= Rp. 1,593,860.00

= Rp. 1,337.50
= Rp. 1,337.50
= Rp. 9,000.00
= Rp. 270.00
= Rp. 9,270.00
= Rp. 10,607.50
= Rp. 10,600.00

= Rp. 4,312.50
= Rp. 10,244.20
= Rp. 10,244.20
= Rp. 24,800.90
= Rp. 4,200.00
= Rp. 5,625.00
= Rp. 637.50
= Rp. 225.00
= Rp. 10,687.50
= Rp. 35,488.40
= Rp. 35,480.00

= Rp. 7,636.00
= Rp. 4,312.50
= Rp. 10,244.20
= Rp. 15,667.60
= Rp. 193.00
= Rp. 630.00
= Rp. 1,070.00
= Rp. 39,753.30
= Rp. 4,200.00
= Rp. 675.00
= Rp. 510.00
= Rp. 225.00
= Rp. 5,610.00
= Rp. 45,363.30
= Rp. 45,360.00

= Rp. 7,636.00
= Rp. 4,312.50
= Rp. 10,244.20
= Rp. 21,091.00
= Rp. 193.00
= Rp. 630.00
= Rp. 1,070.00
= Rp. 45,176.70
= Rp. 4,200.00
= Rp. 7,875.00
= Rp. 340.00
= Rp. 225.00
= Rp. 12,640.00
= Rp. 57,816.70
= Rp. 57,810.00

= Rp. 11,557.50
= Rp. 28,662.60
= Rp. 10,700.00
= Rp. 50,920.10
= Rp. 2,400.00
= Rp. 4,500.00
= Rp. 1,360.00
= Rp. 225.00
= Rp. 8,485.00
= Rp. 59,405.10
= Rp. 59,400.00

= Rp. 9,918.75
= Rp. 1,437.50
= Rp. 535.00
= Rp. 11,891.25
= Rp. 9,600.00
= Rp. 12,000.00
= Rp. 1,360.00
= Rp. 225.00
= Rp. 23,185.00
= Rp. 35,076.25
= Rp. 35,070.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 13,156.00
= Rp. 21,033.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 27,719.00
= Rp. 27,710.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 10,920.00
= Rp. 18,797.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 25,483.00
= Rp. 25,480.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 16,393.00
= Rp. 24,270.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 30,956.00
= Rp. 30,950.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 17,108.00
= Rp. 24,985.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 31,671.00
= Rp. 31,670.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 16,744.00
= Rp. 24,621.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 31,307.00
= Rp. 31,300.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 23,920.00
= Rp. 31,797.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 38,483.00
= Rp. 38,480.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 29,900.00
= Rp. 37,777.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 44,463.00
= Rp. 44,460.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 18,174.00
= Rp. 26,051.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 32,737.00
= Rp. 32,730.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 26,676.00
= Rp. 34,553.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 41,239.00
= Rp. 41,230.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 35,880.00
= Rp. 43,757.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 50,443.00
= Rp. 50,440.00

= Rp. 6,072.00
= Rp. 9,108.00
= Rp. 15,180.00
= Rp. 1,680.00
= Rp. 3,150.00
= Rp. 357.00
= Rp. 225.00
= Rp. 5,412.00
= Rp. 20,592.00
= Rp. 20,590.00
= Rp. 6,072.00
= Rp. 7,560.00
= Rp. 13,632.00
= Rp. 1,680.00
= Rp. 3,150.00
= Rp. 357.00
= Rp. 225.00
= Rp. 5,412.00
= Rp. 19,044.00
= Rp. 19,040.00

= Rp. 6,072.00
= Rp. 12,582.00
= Rp. 18,654.00
= Rp. 1,680.00
= Rp. 3,150.00
= Rp. 357.00
= Rp. 225.00
= Rp. 5,412.00
= Rp. 24,066.00
= Rp. 24,060.00

= Rp. 3,818.00
= Rp. 193.00
= Rp. 4,011.00
= Rp. 1,200.00
= Rp. 15,000.00
= Rp. 1,700.00
= Rp. 225.00
= Rp. 18,125.00
= Rp. 22,136.00
= Rp. 22,130.00

= Rp. 5,375.00
= Rp. 193.00
= Rp. 5,568.00
= Rp. 1,200.00
= Rp. 15,000.00
= Rp. 1,700.00
= Rp. 225.00
= Rp. 18,125.00
= Rp. 23,693.00
= Rp. 23,690.00

= Rp. 2,817.50
= Rp. 7,050.00
= Rp. 14,100.00
= Rp. 23,967.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 30,653.00
= Rp. 30,650.00
= Rp. 2,817.50
= Rp. 10,000.00
= Rp. 20,000.00
= Rp. 32,817.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 39,503.00
= Rp. 39,500.00

= Rp. 63,630.00
= Rp. 7,500.00
= Rp. 71,130.00
= Rp. 15,000.00
= Rp. 35,000.00
= Rp. 4,500.00
= Rp. 117.00
= Rp. 54,617.00
= Rp. 125,747.00
= Rp. 125,740.00

= Rp. 77,467.00
= Rp. 7,500.00
= Rp. 84,967.00
= Rp. 15,000.00
= Rp. 35,000.00
= Rp. 4,500.00
= Rp. 117.00
= Rp. 54,617.00
= Rp. 139,584.00
= Rp. 139,580.00

= Rp. 46,600.00
= Rp. 7,500.00
= Rp. 54,100.00
= Rp. 30,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 2,250.00
= Rp. 52,000.00
= Rp. 106,100.00
= Rp. 106,100.00

= Rp. 66,450.00
= Rp. 7,500.00
= Rp. 73,950.00
= Rp. 30,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 2,250.00
= Rp. 52,000.00
= Rp. 125,950.00
= Rp. 125,950.00

= Rp. 155,190.00
= Rp. 7,500.00
= Rp. 162,690.00
= Rp. 30,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 2,250.00
= Rp. 52,000.00
= Rp. 214,690.00
= Rp. 214,690.00

= Rp. 122,500.00
= Rp. 7,500.00
= Rp. 130,000.00
= Rp. 30,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 2,250.00
= Rp. 52,000.00
= Rp. 182,000.00
= Rp. 182,000.00

= Rp. 52,320.00
= Rp. 750.00
= Rp. 2,740.00
= Rp. 55,810.00
= Rp. 3,600.00
= Rp. 1,400.00
= Rp. 180.00
= Rp. 270.00
= Rp. 5,450.00
= Rp. 61,260.00
= Rp. 61,260.00

= Rp. 349,791.67
= Rp. 349,791.67
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 9,000.00
= Rp. 34,000.00
= Rp. 63,414.29
= Rp. 23,951.46
= Rp. 1,000.00
= Rp. 88,365.75
= Rp. 472,157.42
= Rp. 472,150.00

= Rp. 456,326.67
= Rp. 456,326.67
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 9,000.00
= Rp. 34,000.00
= Rp. 63,414.29
= Rp. 23,951.46
= Rp. 1,000.00
= Rp. 88,365.75
= Rp. 578,692.42
= Rp. 578,690.00

= Rp. 636,493.33
= Rp. 636,493.33
= Rp. 30,000.00
= Rp. 11,666.90
= Rp. 15,000.30
= Rp. 56,667.20
= Rp. 63,414.29
= Rp. 23,951.46
= Rp. 1,000.00
= Rp. 88,365.75
= Rp. 781,526.29
= Rp. 781,520.00

= Rp. 921,916.67
= Rp. 921,916.67
= Rp. 30,000.00
= Rp. 11,666.90
= Rp. 15,003.00
= Rp. 56,669.90
= Rp. 43,434.45
= Rp. 16,575.41
= Rp. 1,000.00
= Rp. 61,009.85
= Rp. 1,039,596.42
= Rp. 1,039,590.00

= Rp. 1,308,125.00
= Rp. 1,308,125.00
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 6,750.00
= Rp. 31,750.00
= Rp. 63,414.29
= Rp. 16,575.41
= Rp. 1,000.00
= Rp. 80,989.70
= Rp. 1,420,864.70
= Rp. 1,420,860.00

= Rp. 1,471,041.67
= Rp. 1,471,041.67
= Rp. 40,000.29
= Rp. 11,666.90
= Rp. 15,000.11
= Rp. 66,667.29
= Rp. 63,414.29
= Rp. 25,774.76
= Rp. 1,000.00
= Rp. 90,189.05
= Rp. 1,627,898.01
= Rp. 1,627,890.00

= Rp. 2,553,958.33
= Rp. 2,553,958.33
= Rp. 40,002.00
= Rp. 11,666.90
= Rp. 15,000.75
= Rp. 66,669.65
= Rp. 63,414.29
= Rp. 25,774.76
= Rp. 1,000.00
= Rp. 90,189.05
= Rp. 2,710,817.03
= Rp. 2,710,810.00

= Rp. 3,488,333.33
= Rp. 3,488,333.33
= Rp. 40,000.29
= Rp. 11,666.90
= Rp. 15,000.11
= Rp. 66,667.29
= Rp. 149,892.28
= Rp. 25,774.76
= Rp. 1,000.00
= Rp. 176,667.03
= Rp. 3,731,667.66
= Rp. 3,731,660.00

= Rp. 1,017,500.00
= Rp. 1,017,500.00
= Rp. 40,002.86
= Rp. 11,670.00
= Rp. 15,001.07
= Rp. 66,673.93
= Rp. 183,163.06
= Rp. 16,575.41
= Rp. 1,000.00
= Rp. 200,738.47
= Rp. 1,284,912.40
= Rp. 1,284,910.00

= Rp. 2,412,125.00
= Rp. 2,412,125.00
= Rp. 40,002.86
= Rp. 11,670.00
= Rp. 15,001.07
= Rp. 66,673.93
= Rp. 183,163.06
= Rp. 16,575.41
= Rp. 1,000.00
= Rp. 200,738.47
= Rp. 2,679,537.40
= Rp. 2,679,530.00
= Rp. 3,359,916.67
= Rp. 3,359,916.67
= Rp. 40,002.86
= Rp. 11,670.00
= Rp. 15,001.07
= Rp. 66,673.93
= Rp. 183,163.06
= Rp. 16,575.41
= Rp. 1,000.00
= Rp. 200,738.47
= Rp. 3,627,329.06
= Rp. 3,627,320.00

= Rp. 4,917,208.33
= Rp. 4,917,208.33
= Rp. 48,000.00
= Rp. 14,000.00
= Rp. 18,000.00
= Rp. 80,000.00
= Rp. 183,163.06
= Rp. 25,774.76
= Rp. 1,000.00
= Rp. 209,937.82
= Rp. 5,207,146.15
= Rp. 5,207,140.00

= Rp. 287,500.00
= Rp. 287,500.00
= Rp. 2,250.00
= Rp. 875.00
= Rp. 1,125.00
= Rp. 4,250.00
= Rp. 12,970.25
= Rp. 1,000.00
= Rp. 13,970.25
= Rp. 305,720.25
= Rp. 305,720.00

= Rp. 412,083.33
= Rp. 412,083.33
= Rp. 2,250.00
= Rp. 875.00
= Rp. 1,125.00
= Rp. 4,250.00
= Rp. 12,970.25
= Rp. 1,000.00
= Rp. 13,970.25
= Rp. 430,303.59
= Rp. 445,523.84

= Rp. 460,000.00
= Rp. 460,000.00
= Rp. 3,000.00
= Rp. 1,167.00
= Rp. 1,500.43
= Rp. 5,667.43
= Rp. 23,951.46
= Rp. 1,000.00
= Rp. 24,951.46
= Rp. 490,618.89
= Rp. 490,610.00

g termasuk penyediaan batu dan kawat brojong untuk

= Rp. 501,250.00
= Rp. 501,250.00
= Rp. 150,000.00
= Rp. 96,000.00
= Rp. 7,200.00
= Rp. 253,200.00
= Rp. 360,300.00
= Rp. 270,000.00
= Rp. 6,750.00
= Rp. 637,050.00
= Rp. 1,391,500.00
= Rp. 463,833.33
= Rp. 463,830.00
g termasuk penyediaan batu dan kawat brojong untuk

= Rp. 621,250.00
= Rp. 621,250.00
= Rp. 165,000.00
= Rp. 108,000.00
= Rp. 7,200.00
= Rp. 280,200.00
= Rp. 360,300.00
= Rp. 270,000.00
= Rp. 6,750.00
= Rp. 637,050.00
= Rp. 1,538,500.00
= Rp. 512,833.33
= Rp. 512,830.00

= Rp. 216,180.00
= Rp. 86,616.00
= Rp. 245,000.00
= Rp. 547,796.00
= Rp. 45,000.00
= Rp. 22,500.00
= Rp. 5,400.00
= Rp. 1,350.00
= Rp. 74,250.00
= Rp. 622,046.00
= Rp. 622,040.00

= Rp. 216,180.00
= Rp. 153,984.00
= Rp. 353,000.00
= Rp. 723,164.00
= Rp. 51,000.00
= Rp. 22,500.00
= Rp. 5,400.00
= Rp. 1,350.00
= Rp. 80,250.00
= Rp. 803,414.00
= Rp. 803,410.00

= Rp. 216,180.00
= Rp. 240,600.00
= Rp. 353,000.00
= Rp. 809,780.00
= Rp. 57,000.00
= Rp. 22,500.00
= Rp. 5,400.00
= Rp. 1,350.00
= Rp. 86,250.00
= Rp. 896,030.00
= Rp. 896,030.00

= Rp. 195,000.00

= Rp. 195,000.00
= Rp. 83,450.00
= Rp. 83,450.00
= Rp. 278,450.00
= Rp. 278,450.00

= Rp. 309,750.00

= Rp. 309,750.00
= Rp. 83,450.00
= Rp. 83,450.00
= Rp. 393,200.00
= Rp. 393,200.00

= Rp. 141,000.00
= Rp. 141,000.00
= Rp. 64,150.00
= Rp. 64,150.00
= Rp. 205,150.00
= Rp. 205,150.00

= Rp. 196,950.00
= Rp. 4,571.25
= Rp. 201,521.25
= Rp. 1,500.00
= Rp. 900.00
= Rp. 2,500.00
= Rp. 2,000.00
= Rp. 6,900.00
= Rp. 7,286.25
= Rp. 62,500.00
= Rp. 1,007.50
= Rp. 70,793.75
= Rp. 279,215.00
= Rp. 279,210.00

KERJAAN RIP/RAP BATU GUNUNG (MEKANIS)

= Rp. 144,120.00
= Rp. 144,120.00
= Rp. 29,145.00
= Rp. 29,145.00
= Rp. 173,265.00
= Rp. 173,260.00

= Rp. 240,000.00
= Rp. 36,000.00
= Rp. 276,000.00
= Rp. 276,000.00

= Rp. 120,000.00
= Rp. 9,000.00
= Rp. 129,000.00
= Rp. 129,000.00

= Rp. 60,000.00
= Rp. 22,500.00
= Rp. 2,250.00
= Rp. 4,500.00
= Rp. 89,250.00
= Rp. 89,250.00

= Rp. 77,625.00
= Rp. 3,500.00
= Rp. 71,790.01
= Rp. 37,200.00
= Rp. 190,115.01
= Rp. 30,000.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 900.00
= Rp. 80,400.00
= Rp. 270,515.01
= Rp. 270,510.00

= Rp. 25,875.00
= Rp. 6,468.75
= Rp. 32,343.75
= Rp. 21,000.00
= Rp. 26,250.00
= Rp. 2,800.00
= Rp. 1,620.00
= Rp. 51,670.00
= Rp. 84,013.75
= Rp. 84,010.00

= Rp. 22,640.63
= Rp. 2,213.75
= Rp. 24,854.38
= Rp. 15,000.00
= Rp. 18,750.00
= Rp. 2,000.00
= Rp. 1,170.00
= Rp. 36,920.00
= Rp. 61,774.38
= Rp. 61,770.00
= Rp. 47,030.21
= Rp. 3,018.75
= Rp. 48,461.00
= Rp. 98,509.96
= Rp. 9,000.00
= Rp. 33,750.00
= Rp. 3,600.00
= Rp. 720.00
= Rp. 47,070.00
= Rp. 145,579.96
= Rp. 145,570.00

= Rp. 47,030.21
= Rp. 3,018.75
= Rp. 82,828.75
= Rp. 132,877.71
= Rp. 9,000.00
= Rp. 33,750.00
= Rp. 3,600.00
= Rp. 720.00
= Rp. 47,070.00
= Rp. 179,947.71
= Rp. 179,940.00

= Rp. 57,020.83
= Rp. 16,291.67
= Rp. 73,312.50
= Rp. 15,000.00
= Rp. 18,750.00
= Rp. 2,000.00
= Rp. 1,170.00
= Rp. 36,920.00
= Rp. 110,232.50
= Rp. 110,230.00

= Rp. 50,647.92
= Rp. 2,213.75
= Rp. 52,861.67
= Rp. 15,000.00
= Rp. 18,750.00
= Rp. 2,000.00
= Rp. 1,170.00
= Rp. 36,920.00
= Rp. 89,781.67
= Rp. 89,780.00

= Rp. 180,000.00
= Rp. 180,000.00
= Rp. 180,000.00

= Rp. 180,000.00
= Rp. 180,000.00
= Rp. 180,000.00
= Rp. 15,000.00
= Rp. 4,500.00
= Rp. 19,500.00
= Rp. 19,500.00
= Rp. 180,000.00
= Rp. 31,500.00
= Rp. 211,500.00
= Rp. 211,500.00

= Rp. 15,000.00
= Rp. 2,250.00
= Rp. 17,250.00
= Rp. 17,250.00

= Rp. 1,253,750.00
= Rp. 193.00
= Rp. 1,253,943.00
= Rp. 9,000.00
= Rp. 112,500.00
= Rp. 12,750.00
= Rp. 6,750.00
= Rp. 141,000.00
= Rp. 1,394,943.00
= Rp. 92,996.20
= Rp. 92,990.00

Banyuwangi, Maret 2017

KEPALA DINAS PEKERJAAN UMUM


BINA MARGA, CIPTA KARYA DAN TATA RUANG
KABUPATEN BANYUWANGI

NIP. 19660915 199602 1 002


07.31.19 Sewa Alat Berat ASPHALT LIQUID MIXER
07.31.19 Sewa Alat Berat TRONTON
07.31.19 Sewa Alat Berat COLD MILLING
07.31.19 Sewa Alat Berat ROCK DRILL BREAKER
07.31.19 Sewa Alat Berat COLD RECYCLER
07.31.19 Sewa Alat Berat HOT RECYCLER
07.31.19 Sewa Alat Berat AGGREGAT (CHIP) SPREADER
07.31.19 Sewa Alat Berat ASPHALT DISTRIBUTOR
07.31.19 Sewa Alat Berat SLIP FORM PAVER
07.31.19 Sewa Alat Berat CONCRETE PAN MIXER
07.31.19 Sewa Alat Berat CONCRETE BREAKER
07.31.19 Sewa Alat Berat ASPAHLT TANKER
07.31.19 Sewa Alat Berat CEMENT TANKER
07.31.19 Sewa Alat Berat CONDRETE MIXER (350)
07.31.19 Sewa Alat Berat VIBRATING RAMMER
07.31.19 Sewa Alat Berat TRUK MIXER (AGITATOR)
07.31.19 Sewa Alat Berat BORE PILE MACHINE
07.31.19 Sewa Alat Berat CRANE ON TRACK 75-100 TON
07.31.19 Sewa Alat Berat BLENDING EQUIPMENT
07.31.19 Sewa Alat Berat ASPHALT LIQUID MIXER
07.31.19 Sewa Alat Berat BAR BENDER
07.31.19 Sewa Alat Berat BAR CUTTER
07.31.19 Sewa Alat Berat BREAKER
07.31.19 Sewa Alat Berat GROUTING PUMP
07.31.19 Sewa Alat Berat JACK HIDROLIC
07.31.19 Sewa Alat Berat MESIN LAS
07.31.19 Sewa Alat Berat PILE DRIVER LEADER, 75 kw
07.31.19 Sewa Alat Berat PILE HAMMER
07.31.19 Sewa Alat Berat PILE HAMMER, 2,5 Ton
07.31.19 Sewa Alat Berat STRESSING JACK
07.31.19 Sewa Alat Berat WELDING MACHINE, 300 A

BAHAN LAINNYA
07.31.20 Bahan Lainnya Readymix B.0
07.31.20 Bahan Lainnya Beton Ready Mix K 125
07.31.20 Bahan Lainnya Beton Ready Mix K 175
07.31.20 Bahan Lainnya Beton Ready Mix K 225
07.31.20 Bahan Lainnya Beton Ready Mix K 250
07.31.20 Bahan Lainnya Beton Ready Mix K 275
07.31.20 Bahan Lainnya Beton Ready Mix K 300
07.31.20 Bahan Lainnya Beton Ready Mix K 350
07.31.20 Bahan Lainnya Beton Ready Mix K 400
07.31.20 Bahan Lainnya Beton Ready Mix K 450
07.31.20 Bahan Lainnya Beton Ready Mix FS 45
07.31.20 Bahan Lainnya Beton Ready Mix FS 47
07.31.20 Bahan Lainnya Banner

UPAH
07.31.22 Upah Mandor Lapangan
07.31.22 Upah Kepala Tukang Batu
07.31.22 Upah Kepala Tukang kayu
07.31.22 Upah Kepala Tukang Cat
07.31.22 Upah Kepala Tukang Besi
07.31.22 Upah Kepala Tukang Las
07.31.22 Upah Kepala Tukang Pelitur
07.31.22 Upah Kepala Tukang Bor
07.31.22 Upah Kepala Tukang Pipa
07.31.22 Upah Tukang Batu
/jam 39,592
/jam 536,863
/jam 1,656,982
/jam 302,944
/jam 6,235,469
/jam 7,449,568
/jam 535,274
/jam 365,795
/jam 538,328
/jam 648,672
/jam 826,054
/jam 544,671
/jam 507,071
/jam 78,353
/jam 46,639
/jam 630,593
/jam 650,272
/jam 624,927
/jam 226,121
/jam 108,822
/jam 21,701
/jam 21,701
/jam 184,204
/jam 223,764
/jam 31,898
/jam 33,254
/jam 164,424
/jam 50,264
/jam 27,942
/jam 202,006
/jam 35,854

m3 765,900
m3 812,500
m3 838,400
m3 900,500
m3 931,500
m3 957,400
m3 1,004,000
m3 1,060,900
m3 1,135,400
m3 1,233,700
m3 1,269,900
m3 1,297,900
m2 30,000

org/hari 100,000
org/hari 90,000
org/hari 100,000
org/hari 90,000
org/hari 100,000
org/hari 100,000
org/hari 100,000
org/hari 90,000
org/hari 100,000
org/hari 85,000
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

Harga
No Jenis Pekerjaan Merk Satuan
2018
WALL PLUS
1 Panel 61 x 244 x T. 5 cm bh 390,000
2 Panel 61 x 244 x T. 7,5 cm bh 468,100
3 Panel 61 x 244 x T. 9 cm bh 569,700
4 Panel 61 x 244 x T. 10 cm bh 614,600
5 Panel 61 x 244 x T. 12 cm bh 808,700

AKSESORIS
7 BM 110 ( 40 kg ) 6600/kg 318,700
8 BM 210 ( 35 kg ) 19800/kg 836,700
9 BM A+B ( 16 kg ) 44000/kg 850,000
DAFTAR SURVEY HARGA BAHAN BANGUNAN
SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk Satuan


ALAT BANTU
1 Amplas Soligen, Norton m
2 Kuas uk. 4" Eterna buah
3 Minyak pelumas miditran S.40 Liter
7 Stempet Kg
8 Mollen beton (sewa) Unit / Hr
9 Pemadat timbunan (Vibro Roller/stamper) Unit / m²
10 Pesawat ukur (sewa) Unit/Hari
11 Vibrator beton (sewa) Unit/Hari
12 Scafolding (sewa) Set/Hr
Y HARGA BAHAN BANGUNAN

Harga
2018

10,300
21,400
31,000
-
138,000
-
-
-
4,600
DAFTAR SURVEY HARGA BAHAN BANGUNAN
SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk


BAHAN PENGGANTUNG
1 Door Closer Soligen
2 Door Holder
3 Door Stop Gomeo
4 Pegangan pintu panjang motif Muller
Pegangan pintu standart Gomeo
5 Engsel pintu 4" biasa
6 Engsel pintu 4" tebal SES Solid, Vintage
7 Engsel jendela 3" biasa
8 Engsel jendela 3" tebal Solid, SES,Vintage
9 Engsel besar 5-6" Solid, SES, Grandino
10 Floor hinge biasa
11 Floor hinge, Patch fitting, kunci frameless Dorma ( 1sisi /1set 2 pieces)
12 Floor hinge Deksson
13 Patch fitting Deksson
14 Shower finger Deksson
15 Grendel/selot kecil 2" SES, Vintage, solid
16 Grendel/selot besar 4" SES, Vintage, solid
17 Grendel tanam kecil merk SES, Vintage, solid
18 Grendel tanam besar merk SES, Vintage, solid
19 Grendel jendela aluminium SES, Vintage, solid
20 Engsel pintu aluminium
21 Engsel jendela aluminium
22 Hak/kait angin biasa SES
23 Hak/kait angin artistik
24 Hak/kait angin merk
25 Side Hung Stainless
26 Top Hung Stainless
27 Pivot Hung
28 Kunci pintu biasa
29 Kunci pintu tanggung Gomeo
30 Kunci pintu Kempinsky,Solid, Grandino
31 Kunci tanam merk Kempinsky,Solid, Grandino, SES
32 Kunci tanam kamar mandi
33 Kunci pintu aluminium
34 Kunci pintu flame less Stainless

Engsel Jendela Arcel Nrp 3" Sss Sus 304


Rel Pintu Geser Soligen J3 180 cm
Engsel Pintu Garasi Lipat Besi / Kayu Henderson
Engsel Pintu SOLID 4 inch Tebal 3 inch
Engsel Pintu Arcel Nrp 4" Sss Sus 304
Engsel Pintu Arcel Nrp 5" Sss Sus 304
Engsel Binoche Premium 32525 2bb Sss
Engsel Pintu Stainless 3" Ecoline Dekson
Engsel Pintu Stainless Steel 4x3x3mm 4bb
Engsel 4" H 2bb Ecoline Dekson/ Engsel Aluminium Tanpa Coak
Engsel Pintu Stainles 4" Ecolen Dekson
Handle Pintu Sliding Arcel 628 Sss Sus 304
Engsel Pintu Stainless Steel 3x2.5x2.5mm 2bb
Engsel Pintu Kupu Kupu 3"X2,5"X2 Mm 2bb Hampton
Body Kunci Arcel Full Sss Sus 304
Grendel jendela / spring knip
Kunci Espanyolet HaFELE (Espagnolette)
Casement handle
Shower hinge dekson
Kunci silinder
Kunci tanam aluminium
Kunci pintu kamar mandi
RVEY HARGA BAHAN BANGUNAN

Harga
Satuan
2018

Buah 201,200
Buah 46,000
Buah 64,400
Buah 373,700
Buah 136,500
Buah 18,200
Buah 80,500
Buah 14,100
Buah 43,700
Buah 212,700
Buah 997,000
Set 1,725,000
Set 1,700,000
Buah 550,000
Set 700,000
Buah 13,900
Buah 20,700
Buah 90,000
Buah 181,100
Buah 24,725
Buah 133,400
Buah 88,500
Buah 7,700
Buah 37,300
Buah 40,200
Buah #DIV/0!
Buah #DIV/0!
Buah #DIV/0!
Buah 83,300
Buah 123,600
Buah 393,800
Buah 255,800
Buah 103,500
Buah 209,150
Buah 66,125

Buah 52,500
Buah 209,300
Buah 184,000
Buah 43,100
Buah 60,800
Buah 85,100
Buah 38,500
Buah 34,500
Buah 69,000
Buah 54,600
Buah 46,000
Buah 280,800
Buah 46,000
Buah 19,500
Buah 281,200
Buah 23,000
Buah 216,000
Buah 24,100
Buah 646,400
Buah 105,700
Buah 114,700
Buah 70,000
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

Harga
No Jenis Pekerjaan Merk Satuan
(Rp.)
EXPANDED METAL
1 C-0507 Steel 0.9 x 11 m Lembar 754,600
2 E-0510 Steel 1.2 x 10 m Lembar 892,300
3 F-0510 Steel 1.2 x 10 m Lembar 687,000
4 H-0510 Steel 1.2 x 10 m Lembar 619,400
5 J-0510 Steel 1.2 x 10 m Lembar 420,200
6 J-1015 Steel 1.2 x 10 m Lembar 1,167,600
7 M-0508 Steel 1.2 x 30 m Lembar 1,029,900
8 PRM-0520 Steel 0.9 x 10 m Lembar 481,700
9 U-0310 Steel 1.2 x 10 m Lembar 234,200
10 U-0515 Steel 1.2 x 3.2 m Lembar 137,600
11 U-0510 Steel 1.2 x 30 m Lembar 860,900
12 DD-1020 Steel 1.2 x 2.4 m Lembar 159,300
13 DD-1620 Steel 1.2 x 2.4 m Lembar 234,200
14 FF-1628 Steel 1.2 x 2.4 m Lembar 255,900
15 FF-2028 Steel 1.2 x 2.4 m Lembar 282,500
16 FF-3035 Steel 1.2 x 2.4 m Lembar 468,500
17 GG-2025 Steel 1.2 x 2.4 m Lembar 213,700
18 GG-3025 Steel 1.2 x 2.4 m Lembar 310,300
19 GG-3045 Steel 1.2 x 2.4 m Lembar 406,900
20 HH-2025 Steel 1.2 x 2.4 m Lembar 220,900
21 HH-3025 Steel 1.2 x 2.4 m Lembar 323,600
22 HH-3045 Steel 1.2 x 2.4 m Lembar 420,200
23 U-1015 Steel 1.2 x 2.4 m Lembar 185,900
24 U-0715 Steel 1.2 x 2.4 m Lembar 159,300
25 BB-3032 Steel 1.2 x 2.4 m Lembar 420,200
26 EE-3035 Steel 1.2 x 2.4 m Lembar 344,100
27 EE-3045 Steel 1.2 x 3,0 m Lembar 420,200
28 GM-30080 Steel 1.2 x 2.4 m Lembar 754,600
29 GM-50075 Steel 1.2 x 2.4 m Lembar 1,380,100
30 GM-50105 Steel 1.2 x 2.4 m Lembar 1,660,300
31 GM-60075 Steel 1.2 x 2.4 m Lembar 1,784,600
32 GM-60105 Steel 1.2 x 2.4 m Lembar 2,244,700
33 GR-50080 Steel 1.2 x 2.4 m Lembar 899,500
34 GR-50110 Steel 1.2 x 2.4 m Lembar 1,161,600
35 GR-60080 Steel 1.2 x 2.4 m Lembar 1,345,100
36 GR-60110 Steel 1.2 x 2.4 m Lembar 1,682,000
37 XF-50060 Steel 1.2 x 2.4 m Lembar 571,100
38 XF-30050 Steel 1.2 x 2.4 m Lembar 323,600
39 XS-30050 Steel 1.2 x 2.4 m Lembar 213,700
40 XS-50060 Steel 1.2 x 2.4 m Lembar 358,600
41 YY-30050 Steel 1.2 x 2,4 m Lembar 336,800
42 YY-50060 Steel 1.2 x 2,4 m Lembar 590,400
43 C-0507 Aluminium 1 x 10 m Lembar 678,600
44 E-0505 Aluminium 1.2 x 25 m Lembar 1,481,600
45 E-0505 Aluminium 1 x 25 m Lembar 1,243,700
46 E-0808 Aluminium 1 x 25 m Lembar 2,401,700
47 E-0808 Aluminium 1.2 x 25 m Lembar 2,853,300
48 F-0510 Aluminium 1 x 50 m Lembar 3,046,500
49 F-0510 Aluminium 1.2 x 30 m Lembar 2,187,900
50 F-0808 Aluminium 1 x 30 m Lembar 2,317,100
51 F-0808 Aluminium 1.2 x 30 m Lembar 2,753,100
52 F-0810 Aluminium 1 x 30 m Lembar 2,497,100
53 F-0810 Aluminium 1.2 x 30 m Lembar 2,986,100
54 F-1010 Aluminium 1 x 20 m Lembar 2,248,300
55 H-0808 Aluminium 1 x 30 m Lembar 1,725,500
56 H-0808 Aluminium 1.2 x 30 m Lembar 2,058,700
57 H-0810 Aluminium 1 x 30 m Lembar 1,853,500
58 H-0810 Aluminium 1.2 x 30 m Lembar 2,187,900
59 H-1010 Aluminium 1 x 20 m Lembar 1,630,100
60 J-0808 Aluminium 1 x 50 m Lembar 2,660,100
61 J-0808 Aluminium 1.2 x 30 m Lembar 1,880,000
62 J-0810 Aluminium 1 x 30 m Lembar 1,698,900
63 J-0810 Aluminium 1.2 x 30 m Lembar 2,033,400
64 J-1010 Aluminium 1 x 30 m Lembar 2,238,700
65 J-1015 Aluminium 1 x 15 m Lembar 1,605,900
66 U-1015 Aluminium 1 x 25 m Lembar 1,910,200
67 DD-1025 Aluminium 1 x 15 m Lembar 1,095,200
68 PRM-1025 Aluminium 1 x 10 m Lembar 1,080,700
69 R-8 Aluminium 1 x 50 m Lembar 1,288,400
70 R-8 Aluminium 1.2 x 50 m Lembar 1,544,300
71 R-10 Aluminium 1 x 50 m Lembar 2,231,400
72 R-10 Aluminium 1.2 x 50 m Lembar 2,660,100
73 T-5 Aluminium 1 x 25 m Lembar 944,200
74 T-5 EK Aluminium 1 x 25 m Lembar 902,000
75 S-8 Aluminium 1 x 50 m Lembar 944,200
76 S-8 Aluminium 1.2 x 50 m Lembar 1,159,200
77 WRS-20N Aluminium 1 x 20 m Lembar 463,600
BAHAN BANGUNAN
NO. NAMA BARANG

Roster / Angin-Angin
Roster Beton
Roster Kotak
Roster Salipan
Roster Jalusi kecil
Roster Wajik

Roster Kotak Profil

Roster Jalusi Besar


Roster Madina
Roster Kotak 4 Polos

Kanstin
Kanstin Halus 60x27x10/15 K 225

Kanstin 40x28x12/16 K 225

Kanstin Taman 40x20x8/10 K225

Kanstin S 40x30x9/17 K 225

Kanstin Duduk 38,5x20x10/20 K 225

DIFABEL
Difabel Uk. 30cmx30cm

BATU ALAM
Batu Andesit

Batu Kobel Andesit/Crobel Stone

Batu Palimanan Rata Mesin


Batu Palimanan RTA

Batu Susun Sirih Palimanan

Batu Palimanan Jenis Alur


- Batu Palimanan Anyam Bilik

- Alur Napoli Palimanan


- Alur Napoli Kombinasi

Batu Garut
Batu Alor
Batu Ambon
Batu Kupang
Batu Pancawarna
Batu Hijau
Batu Bali
Batu Italy
Batu Kali Belah
Batu Knecker

Batu Pecah
Batu Krukul

BETON CETAK FEROSEMEN


Dinding Beton
Dinding Beton Ferosemen uk. 30x40x100

Dinding Beton Ferosemen uk. 40x50x100

Dinding Beton Ferosemen uk. 50x60x100

Dinding Beton Ferosemen uk. 30x40x120

Dinding Beton Ferosemen uk. 40x50x120

Dinding Beton Ferosemen uk. 50x60x120

Penutup Beton
Tutup Beton uk. 30x40x100

Tutup Beton uk. 40x50x100

Tutup Beton uk. 50x60x100


Tutup Beton uk. 30x40x120

Tutup Beton uk. 40x50x120

Tutup Beton uk. 50x60x120


SPESIFIKASI SATUAN HARGA (Rp.)

Uk. 20x20 bh 16,000


Uk. 20x40 bh 24,000
Uk. 15x25 bh 14,000
Uk. 15x30 bh 14,000
Uk. 20x40 bh 22,000
Uk. 12x24 bh 14,000
Uk. 15x30 bh 19,000
Uk. 15x40 bh 24,000
Uk. 15x45 bh 31,000
Uk. 38x38 bh 38,000
Uk. 25x25 bh 22,000
Uk. 20x40 bh 14,000

P=60cm x T=27cm x LA 10cm x LB 15cm ; Permukaan bh 69,000


Halus ; Cor Beton K.225
P= 40cm x T=28cm x LA 12cm x LB 16cm ; Permukaan bh 46,000
Halus ; Cor Beton K.225
P=40cm x T= 20cm x LA 8cm x LB 10cm ; Permukaan bh 28,750
Halus ; Cor Beton K.225
P= 40cm x T= 30cm x LA 9cm x LB 17cm ; Permukaan bh 51,750
Halus ; Cor Beton K.225
P= 38,5cm x T=20cm x LA 10cm x LB 20cm ; Permukaan bh 40,250
Halus ; Cor Beton K.225

Uk. 30cmx30cm bh 28,750

Tebal = 1.4 cm ; Panjang = 15 cm ; Lebar = 30 cm m2 103,500


Tebal = 1.4 cm ; Panjang = 20 cm ; Lebar = 40 cm m2 109,250
Tebal = 1.4 cm ; Panjang = 30 cm ; Lebar = 30 cm m2 115,000
Tebal = 1.4 cm ; Panjang = 30 cm ; Lebar = 60 cm m2 120,750
Tebal = 1.4 cm ; Panjang = 40 cm ; Lebar = 40 cm m2 132,250
Tebal = 1.4 cm ; Panjang = 40 cm ; Lebar = 60 cm m2 155,250
Tebal = 1.4 cm ; Panjang = 50 cm ; Lebar = 50 cm m2 178,250
Tebal = 1.4 cm ; Panjang = 60 cm ; Lebar = 60 cm m2 212,750
Tebal = 1.4 cm ; Panjang = 30 cm ; Lebar = 3 cm m2 80,500
Tebal = 1.4 cm ; Panjang = 40 cm ; Lebar = 3 cm m2 92,000
Tebal = 1.4 cm ; Panjang = 30 cm ; Lebar = 5 cm m2 74,750
Tebal = 1.4 cm ; Panjang = 40 cm ; Lebar = 5 cm m2 86,250
Tebal = 5 cm ; Panjang = 10 cm ; Lebar = 10 cm m2 166,750
Tebal = 3 cm ; Panjang = 40 cm ; Lebar = 5 cm m2 143,750
Tebal = 1.4 cm ; Panjang = 10 cm ; Lebar = 20 cm m2 88,550
Tebal = 1.4 cm ; Panjang = 15 cm ; Lebar = 15 cm m2 95,450
Tebal = 1.4 cm ; Panjang = 20 cm ; Lebar = 20 cm m2 101,200
Tebal = 1.4 cm ; Panjang = 30 cm ; Lebar = 15 cm m2 101,200
Tebal = 1.4 cm ; Panjang = 30 cm ; Lebar = 30 cm m2 111,550
Tebal = 1.4 cm ; Panjang = 40 cm ; Lebar = 20 cm m2 111,550
Tebal = 1.4 cm ; Panjang = 40 cm ; Lebar = 40 cm m2 132,250
Tebal = 1.4 cm ; Panjang = 60 cm ; Lebar = 30 cm m2 132,250
m2 -
m2 -
m2 -
Panjang = 30 cm ; Lebar = 3 cm m2 111,550
Panjang = 40 cm ; Lebar = 3 cm m2 120,750
-
Tebal = 1.4 cm ; Panjang = 30 cm ; Lebar = 15 cm m2 143,750

Tebal = 1.4 cm ; Panjang = 40 cm ; Lebar = 20 cm m2 155,250

Tebal = 1.4 cm ; Panjang = 30 cm ; Lebar = 15 cm m2 134,550


Tebal = 1.4 cm ; Panjang = 40 cm ; Lebar = 20 cm m2 141,450

Tebal = 1.4 cm ; Panjang = 30 cm ; Lebar = 15 cm m2 138,000

Tebal = 1.4 cm ; Panjang = 40 cm ; Lebar = 20 cm m2 146,050

m2 97,750
50kg 322,000
25kg 97,750
25kg 86,250
25kg 80,500
25kg 92,000
10kg 80,500
15kg 92,000
m3 212,750
m3 241,500

Dimensi P = 1,00 cm ; L = 0,46 cm ; T = 0,48 cm ; TBL = set 423,000


0,08 cm; Rangka besi beton; melintang besi beton 6 mm;
memanjang besi beton 6 mm; bahan cor beton K.300
bekisting 3x pakai

Dimensi P = 1,00 cm ;L = 0,56 cm ; T = 0,58 cm ; TBL = set 510,000


0,08 cm; Rangka besi beton; melintang besi beton 8 mm;
memanjang besi beton 6mm; bahan cor beton K.300
bekisting 3x pakai

Dimensi P = 1,00 cm ; L = 0,66 cm ; T = 0,68 cm ; TBL = set 623,000


0,08 cm; Rangka besi beton; melintang besi beton 8 mm;
memanjang besi beton 8 mm; bahan cor beton K.300
bekisting 3x pakai

Dimensi P = 1,20 cm ; L = 0,46 cm ; T = 0,48 cm ; TBL = set 443,000


0,08 cm; Rangka besi beton; melintang besi beton 6 mm;
memanjang besi beton 6 mm; bahan cor beton K.300
bekisting 3x pakai

Dimensi P = 1,20 cm ;L = 0,56 cm ; T = 0,58 cm ; TBL = set 542,000


0,08 cm; Rangka besi beton; melintang besi beton 8 mm;
memanjang besi beton 6mm; bahan cor beton K.300
bekisting 3x pakai

Dimensi P = 1,20 cm ; L = 0,66 cm ; T = 0,68 cm ; TBL = set 666,000


0,08 cm; Rangka besi beton; melintang besi beton 8 mm;
memanjang besi beton 8 mm; bahan cor beton K.300
bekisting 3x pakai

Dimensi P = 1,00 ; L = 0,46 cm ; T = 0,48 cm ; TBL = 0,08 set 127,000


cm; Rangka besi beton 6 mm; bahan cor beton K.300
bekisting 3x pakai
Dimensi P = 1,00 ; L = 0,56 cm ; T = 0,58 cm ; TBL = 0,1 set 166,000
cm. Rangka besi beton 8 mm; bahan cor beton K.300
bekisting 3x pakai
Dimensi P = 1,00 ; L = 0,66 cm ; T = 0,68 cm ; TBL = 0,12 set 210,000
cm. Rangka besi beton 8 mm; bahan cor beton K.300
bekisting 3x pakai
Dimensi P = 1,20 ; L = 0,46 cm ; T = 0,48 cm ; TBL = 0,08 set 151,000
cm. Rangka besi beton 6 mm; bahan cor beton K.300
bekisting 3x pakai
Dimensi P = 1,20 ; L = 0,56 cm ; T = 0,58 cm ; TBL = 0,1 set 198,000
cm. Rangka besi beton 8 mm; bahan cor beton K.300
bekisting 3x pakai
Dimensi P = 1,20 ; L = 0,66 cm ; T = 0,68 cm ; TBL = 0,12 set 250,000
cm. Rangka besi beton 8 mm; bahan cor beton K.300
bekisting 3x pakai
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

Harga
No Jenis Pekerjaan Merk Satuan
(Rp.)
BATERAI DRONE
1 Baterai DJI Inspire 2 TB50 Original Set 3,593,100
2 Baterai DJI Phantom 4 Set 2,843,300
INFO

RESPONDEN
1 2 3 4

3,280,000 3,225,000 3,225,000 2,768,000


2,450,000 2,490,000 2,460,000 2,490,000
rata-rata keuntungan pembulatan
15%

3,124,500 3,593,175 3,593,100


2,472,500 2,843,375 2,843,300
DAFTAR SURVEY HARGA BAHAN BANGUNAN
SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Peralatan Merk Satuan

SEWA ALAT BERAT PER JAM KERJA ( BBM + Operator )


1 ASPHALT MIXING PLANT /Jam
2 ASPHALT FINISHER /Jam
3 ASPHALT SPRAYER /Jam
4 BULLDOZER 100-150 HP /Jam
5 COMPRESSOR 4000-6500 L/M /Jam
6 CONCRETE MIXER 0.3-0.6 M3 /Jam
7 CRANE 10-15 TON /Jam
8 DUMP TRUCK 3.5 TON /Jam
9 DUMP TRUCK 10 TON /Jam
10 EXCAVATOR 80-140 HP /Jam
11 FLAT BED TRUCK 3-4 M3 /Jam
12 GENERATOR SET /Jam
13 MOTOR GRADE > 100 HP /Jam
14 TRACK LOADER 75-100 HP /Jam
15 WHEEL LOADER 1.0-1.6 M3 /Jam
16 THREE WHEEL ROLLER 6-8 T /Jam
17 TANDEM ROLLER 6-8 T /Jam
18 TIRE ROLLER 8-10 T /Jam
19 VIBRATORY ROLLER 5-8 T /Jam
20 CONCRETE VIBRATOR /Jam
21 STONE CRUSHER /Jam
22 WATER PUMP 70-100 mm /Jam
23 WATER TANKER 3000-4500 L /Jam
24 PEDESTRIAN ROLLER /Jam
25 TAMPER /Jam
26 JACK HAMMER /Jam
27 FULVI MIXER /Jam
28 CONCRETE PUMP /Jam
29 TRAILER 20 TON /Jam
30 PILE DRIVER + HAMMER /Jam
31 CRANE ON TRACK 35 TON /Jam
32 WELDING SET /Jam
33 BORE PILE MACHINE /Jam
34 TRONTON /Jam
35 COLD MILLING MACHINE /Jam
36 ROCK DRILL BREAKER /Jam
37 COLD RECYCLER /Jam
38 HOT RECYCLER /Jam
39 AGGREGAT (CHIP) SPREADER /Jam
40 ASPHALT DISTRIBUTOR /Jam
41 SLIP FORM PAVER /Jam
42 CONCRETE PAN MIXER /Jam
43 CONCRETE BREAKER /Jam
44 ASPHALT TANKER /Jam
45 CEMENT TANKER /Jam
46 CONDRETE MIXER (350) /Jam
47 VIBRATING RAMMER /Jam
48 TRUK MIXER (AGITATOR) /Jam
49 BORE PILE MACHINE /Jam
50 CRANE ON TRACK 75-100 TON /Jam
51 BLENDING EQUIPMENT /Jam
52 ASPHALT LIQUID MIXER /Jam
53 BAR BENDER /Jam
54 BAR CUTTER /Jam
55 BREAKER /Jam
56 GROUTING PUMP /Jam
57 JACK HIDROLIC /Jam
58 MESIN LAS /Jam
59 PILE DRIVER LEADER 75 Kw /Jam
60 PILE HAMMER /Jam
61 PILE HAMMER 2,5 TON /Jam
62 STRESSING JACK /Jam
63 WELDING MACHINE 300A /Jam
64 WACKER VIBRATORY TRUSS SCREED /Jam
Y HARGA BAHAN BANGUNAN

Harga
(Rp.)

6,752,752.82
1,150,800.66
55,872.15
569,442.85
150,647.17
137,828.13
381,642.92
255,330.66
434,093.82
412,001.11
414,385.14
389,166.90
669,559.75
328,648.09
341,404.37
190,219.83
287,536.03
372,443.10
244,471.09
41,541.94
795,836.73
36,798.46
248,324.47
61,365.77
43,268.22
35,403.10
-
-
-
-
434,344.00
-
775,597.12
1,618,650.59
505,791.26
293,922.51
6,118,897.89
7,392,996.84
509,452.37
343,423.75
517,156.61
620,000.57
782,682.98
515,013.80
481,413.80
73,095.89
43,151.62
601,336.29
628,664.41
598,070.12
274,097.43
101,165.32
29,947.18
29,947.18
171,747.17
208,907.17
28,681.17
29,947.21
153,167.15
45,907.22
24,965.15
188,469.17
32,397.15
281,250.00
BIDANG PENATAAN RUANG

HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)

Bentuk Semi bonsei diameter minimal


1 Pohon Pule / pohon 16,380,000
25 cm tinggi 300 cm
2 Pohon Pole Diameter pohon 7 cm / pohon 3,675,000
3 Pohon Pole Diameter pohon 5 cm / pohon 2,500,000
4 Pohon Pole Diameter pohon 3 cm / pohon 1,495,000
Tabulampot durian bangkok (Tinggi 2
5 Buah 1,690,700
m)
6 Tabulampot jambu air (Tinggi 2 m) Buah 2,005,300
7 Tabulampot jamaika (Tinggi 2 m) Buah 2,292,800
8 Tabulampot sawo manila (Tinggi 2 m) Buah 2,005,300
9 Tabulampot mangga (Tinggi 2 m) Buah 1,602,800
Tabulampot jambu biji kristal(Tinggi 2
10 Buah 1,487,800
m)
Tabulampot durian merah (Tinggi 2
11 Buah 3,086,800
m)
12 Tabulampot sawo kecik (Tinggi 2 m) Buah 1,280,900
13 Tabulampot petai (Tinggi 2 m) Buah 832,300
14 Tabulampot nangka (Tinggi 2 m) Buah 1,656,000
15 Tabulampot cempedak (Tinggi 2 m) Buah 1,680,400
16 Tabulampot sirsat (Tinggi 2 m) Buah 1,855,800
17 Tabulampot bisbol (Tinggi 2 m) Buah 2,348,800
18 Tabulampot srikaya (Tinggi 2 m) Buah 1,798,300
19 Tabulampot jeruk bali (Tinggi 2 m) Buah 1,742,200
20 Tabulampot belimbing (Tinggi 2 m) Buah 1,308,100
21 Tabulampot kedondong (Tinggi 2 m) Buah 682,900
22 Tabulampot rambutan (Tinggi 2 m) Buah 1,308,100
Tabulampot kelengkeng bangkok
23 Buah 2,422,100
(Tinggi 2 m)
24 Tabulampot langsat (Tinggi 2 m) Buah 754,400
25 Tabulampot duku (Tinggi 2 m) Buah 1,300,900
26 Tabulampot duwet (Tinggi 2 m) Buah 1,670,300
27 Tabulampot jeruk siyem (Tinggi 2 m) Buah 832,300
28 Tabulampot kepundung (Tinggi 2 m) Buah 1,212,600
29 Tabulampot matoa (Tinggi 2 m) Buah 662,600
Tabulampot kacang amazon (Tinggi 2
30 Buah 818,000
m)
31 Tabulampot cerry (Tinggi 2 m) Buah 1,630,100
32 Tabulampot beach berry (Tinggi 2 m) Buah 1,608,500
Tabulampot sawo varigata ( Tinggi 2
33 Buah 1,611,400
m)
34 Tabulampot manggis (Tinggi 2 m) Buah 1,307,200

TANAMAN HIAS
1 Jenis Puring
- Puring Nuri t = 30 cm Pohon 18,900
- Puring Bangkok t = 30 cm Pohon 21,800
- Puring Lokal t = 30 cm Pohon 11,500
- Puring RaMbut t = 30 cm Pohon 14,300
- Puring EMas t = 30 cm Pohon 17,200

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 461
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
2 Berbunga
- AdeniuM Kecil 72,400
- AdeniuM Besar 219,900
- Agave kodok Kecil 24,400
- AlaManda Kecil 51,000
- AlaManda kuning Kecil 25,800
- Anggrek bulan Kecil 77,600
- Anggrek tanah Kecil 30,900
- Asoka Besar / Hawai Batang 41,600
- Asoka Kecil Batang 20,100
- Bougenvil Pohon 38,800
- Bougenvil lokal besar Pohon 330,600
- Bougenvil lokal kecil Pohon 97,000
- Bougenvil parigata kecil Pohon 127,900
- Bougenvil parigata besar Pohon 445,600
- CeMPacka Pohon 64,600
- CeMPacka T. 30 cM Bibit 73,000
- CeMPacka 1,50 - 2 Meter Pohon 165,300
- CeMPacka Mulia T. 2 M 230,000
- CeMPacka Mulia T.30 cM 79,000
- Dahlia Bibit 31,600
- Euforbia Bibit 18,600
- JeMpiring T 50 cM 158,100
- JeMpiring T 40 CM 173,600
- Jepun cendana Bibit 218,500
- Jepun jepang Kecil 115,000
- Jepun lokal T3M 166,700
- Jepun lokal Bibit 43,100
- KeMbang Lilin Pohon 50,300
- KeMbang Siang Pohon 41,600
- Lantana Pohon 71,800
- Lantana besar Batang 33,000
- Lantana kecil Batang 53,100
- Mawar Bibit 103,500
- Mawar Pohon 107,800
- Melati Bibit 14,300
- Melati air Bibit 14,200
- Nusa Indah T 60 cM 25,800
- Nusa Indah Pohon 195,500
- Pariganta Pohon 175,300
- Pariganta Pot 158,100
- Pucuk Merah Pohon 388,100
- Pucuk rejuna Bibit 107,800
- Sandat Bibit 30,100
- Soka bangkok Bibit 15,800
- Soka Hawai Pohon 12,200
- Soka Kerdil Bibit 12,900
- Soka Kuning Bibit 11,500
- Soka Siantan Bibit 16,300

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 462
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
3 Jenis PaleM
- PaleM Beregu Pohon 219,700
- PaleM Botol (60 cM ) Pohon 100,600
- PaleM Ekor Tupai (1 Meter) Pohon 237,100
- PaleM Kipas (50 cM) Pohon 113,500
- PaleM Kuning (60 cM) Pohon 80,500
- PaleM Merah (1 Meter) Pohon 506,000
- PaleM Putri (1 Meter) Pohon 272,900
- PaleM Raja (1 Meter) Pohon 269,400
- PaleM Seledri (1 Meter) Pohon 334,900
- PaleM Washington Pohon 290,300
- PaleM Putih (1 Meter) Pohon 211,300
- PaleM Sadeng Pohon 293,200
4 KoMbinasi
- AgloneMa Besar 2,162,000
- Andong Merah Pohon 23,000
- Bawang bawangan Bibit 5,700
- BayaM Merah Bibit 7,900
- Braksok Pohon 18,600
- Dadap Merah Pohon 44,500
- Kaktus T 20 cM 28,000
- Kaktus Merah T 20 cM 110,600
- Kladi-kladian Bibit 18,600
- Nanas-nanasan Bibit 21,500
- Packu Packuan Bibit 15,800
- Perdu Packis Bibit 14,300
- Pisang Kipas Bibit 76,100
- Sri Rejeki Pohon 28,700
- Taiwan Beauty Pohon 8,600
- Teh-tehan Bibit 18,600
- Walisongo (30 cM) Pohon 18,400
- Bunga Pisang-pisangan Pohon 64,600
5 Dipen
- Dipen Tunggal Pohon 34,900
- Dipen Sebra Pohon 34,600
- Dipen Snow Pohon 32,000
- Dipen Pica Pohon 50,800
- Dipen Pilo Dendron Pohon 37,800
- Dipen Tehtehan Pohon 28,700
6 TanaMan Pinggiran/Lin
- Bulu AyaM Pohon 14,300
- Pangkas Kuning Batang 18,600
- Taiwan Bangkok Pohon 13,200
- BayaM Merah Batang 11,000
- SaMbung Tulang Pohon 50,300
- Suplir Pohon 34,500
- Kuping Gajah Pohon 56,000
- AdeniuM Pohon 130,900
- Cangkringan / Cilang Cilung Pohon 163,800
- Kana Batang 31,600

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 463
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
- Nolina 1 Meter Batang 253,800

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 464
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
7 TanaMan Air
- Spider Lili Pohon 51,700
- Padi Lilin Pohon 52,600
- Siprus Pohon 53,500
- Melati Air Pohon 31,700
- RuMput Prigata Pohon 20,100
- Teratai Pohon 23,400
- Bambu Air Pohon 40,300
- Lotus Pohon 41,600
- Bakau Pohon 14,300
8 TanaMan Perindang
- Glodogan Tiang (1 Meter) Pohon 93,700
- CeMara Lilin (70 cM) Pohon 51,300
- CeMara Rentes Pohon 56,600
- CeMara Pua-pua Pohon 184,000
- Tanjung (1 Meter) Pohon 343,500
- FilisiuM (1 Meter) Pohon 25,800
- Sawo Kecik (1 Meter) Pohon 35,900
- Angsana Pohon 43,100
- FlaMboyan Pohon 40,200
- Mahoni Pohon 23,000
- Zatropa Pohon 346,000
- Ketagi Pohon 27,400
- CeMara udang T. 40cM/ Bibit 218,700
- CeMara eMbun T.30 cM 61,800
- CeMara salju T.30 cM 61,800
- CeMara piking T 30 cM 72,100
- CeMara pentris T.50 cM 38,800
- CeMara kipas T.30 cM 40,900
- CeMara kipas T.20 cM 37,500
- CeMara kipas T 50 cM 87,500
- CeMara papua T. 50 cM 100,300
- CeMara papua T.30 cM 54,600
- CeMara papua T.20 cM 43,100
- CeMara bintang T. 30 cM 60,200
- CeMara pecut T. 30 cM 61,800
- CeMara ripres T. 30 cM 61,700
- CeMara ripres T.40 cM 73,300
- Ketepeng Pohon 338,600
- Sentul tinggi 75 cm phn 191,400
- Sentul tinggi 1 m phn 334,200
- kedondong tinggi 60 cm phn 60,300
- Mandevilla tinggi 60 cm phn 25,800
- Ketapang kencana tinggi 1 m phn 44,500
- Akar wangi phn 34,500
- Cemara udang tinggi 1 m phn 222,200
9 TanaMan Tebing
- Cendrawasih Pohon 25,800
- Cadaca Pohon 25,800
- Packis Kelabang Pohon 11,600

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 465
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
- Packis Sisir Pohon 11,600
- Packis Keriting Pohon 11,600

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 466
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
10 BaMbu dan RuMput
- BaMbu Jakarta Pohon 43,100
- BaMbu Packing Per Pot 33,000
- BaMbu Manila 1M2 43,100
- BaMbu Kuning 1M2 25,800
- RuMput Lokal per M2 25,800
- RuMput Mutiara per M2 48,100
11 TanaMan Bunga
- Bunga Agave tinggi 0,5 M Batang 194,000
- Bogenvil Parigata tinggi 0,6 M; diaMeter 2 cM Pohon 71,800
- Bunga AdentuM tinggi 0,5 M; diaMeter 2 cM Pohon 37,300
- Bunga Sensivera Pohon 33,000
- Bunga Tetehan tinggi 0,5 M Pohon 35,900
- Puring Lokal Pohon 14,300
- Puring Lokal tinggi 0,5 M Pohon 35,900
- Puring Bangkok Pohon 34,500
- Bunga Kulbanda tinggi 1 M Pohon 47,400
- RuMput taMan lokal M2 25,800
- Bunga krokot Merah / hijau Batang 12,900
- Bunga Sansivera lokal Pohon 14,300
- Bunga Sansivera parigata Pohon 14,300
- Bunga teh-teh an kecil Pohon 14,300
- Bunga teh-teh an besar Pohon 30,100
- Bunga kriwil Batang 25,800
- Bunga Sedap malam Tangkai 43,100
- Bibit Bunga Sedap malam Tinggi 15-25 cm Polybag 25,800
12 Bibit Sansevera Varigata Jumlah Daun minimal 2 pot 37,300
13 Bibit Opiopogon Bebas hama penyakit pot 24,400
14 Bibit Aglonema :
- Pred of Sumatra pot 108,500
- Valentine Jumlah Daun minimal 2 pot 169,600
- Rotondun Dalam Pot pot 112,100
- Lipstik Bebas hama penyakit pot 104,900
- Donakarman Media tanah kompak tidak pecah pot 108,500
15 Berbunga : #DIV/0!
- Bibit Adenium Dalam Pot pot 77,000
Bibit tanaMan hias bunga AnthuriuM
16 Polybag 115,000
dalaM polybag dg. 8-10 daun
17 Bibit Bunga Sedap MalaM Polybag 12,900
18 Bibit Bunga Melati Kecil Polybag 15,800
19 Bibit Bunga Mawar Kecil Polybag 40,800
20 Bibit Bunga Puring Lokal Kecil Polybag 18,600
21 Bibit Bunga Asoka Kecil Polybag 24,400
Bunga sepatu varigata merah, putih
22 Pohon 81,900
50 cm
23 Beringin varigata 1.5 m Pohon 316,200
24 Afrait of SuMatra Pohon 327,700
25 Anggrek phapilopidium Polybag 81,900
26 Anggrek macropilum Polybag 79,000
27 Anggrek vanda Polybag 244,300
28 Anggrek insidium Polybag 143,700

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 467
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
29 Anggrek phalaeropsis Polybag 146,600
30 Anggrek cologin Polybag 169,600

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 468
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
31 Anggrek sunbidium Polybag 148,600
32 Anggrek denrosilum Polybag 149,500
33 GeloMbang Cinta Pohon 2,206,500
34 Hokery Pohon 368,000
35 Jayen Pohon 365,100
36 JeMani Pohon 333,500
37 SaMya Culkas Pohon 221,300
38 Dolar Pohon 28,700
39 Aliander Pohon 44,500
40 Serut Pohon 1,063,700
41 Pisang Kipas ( Besar ) Pohon 318,500
42 Palem Kamedoria Pohon 307,000
43 Sepatu Tilem Pohon 50,300
44 Pakis Raja Pohon 212,700
45 Lidah mertua/sansivera Polibag 20,100
46 Aglonema Polibag 198,300
47 Samia kulka Polibag 163,800
48 Bambu kamedoria Polibag 306,900
49 Bromelia Pohon 136,500
50 Filo marbel besar Polibag 207,000
51 Filo marbel kecil Polibag 129,300
52 Asoka jabon besar Polibag 93,400
53 Tri colur kecil Polibag 23,000
54 Tri colur besar Polibag 103,500
55 Kana Polibag 25,800
56 Kadaka (bunga tempel) Polibag 27,300
57 Tanduk menjagan (1 Mata) Polibag 27,300
58 Pandan nus Polibag 14,300
59 Bawang-bawangan Polibag 14,300
60 Spider laili Polibag 14,300
61 Pandan bali (untuk ruangan) Polibag 207,000
62 Pandan bali (untuk taman) Polibag 1,022,000
63 Lea Polibag 25,800
64 Filo deadron jari Polibag 37,300
65 Brokoli (alkalipo) t = 30 cm Polibag 38,500
66 Jaburan putih t = 30 cm Polibag 31,600
67 Jarak merah/Kosta merah 50 cm Pohon 28,600
68 Kalatea t = 30 cm Polibag 37,300
69 sirih gading Polibag 14,300
70 tabebuia (lingkar batang 20cm) phn 73,300
71 kaca piring phn 60,300
72 dewan daru phn 274,400
73 Chrysanthinum (bunga krisan) phn 24,400
74 Kacang-kacangan polybag 24,400
75 Iris t = 30 cm phn 25,800
76 Zodia polybag 16,500
77 Amarilis phn 20,100
78 Likwanyu btng 12,200
79 Kolius t = 25 cm phn 25,800
80 Rorobusa t = 30 cm polybag 25,800

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 469
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
81 Pucuk Merah Mini pohon 11,500
82 Spiderlili tinggi 70 cm batang 14,300
83 Sambang Dara pohon 15,000
Pohon tinggi 2 m diameter 10 cm +
84 Sono kembang Pohon 155,600
stegger + ongkos gali
85 Simbar Batang 14,300
86 Sarbena silver Pohon 71,300
87 Sambung nyawa Polybag 27,300
88 Ekor kuda/Pinisetum Polybag 20,100
89 Wali Songo tinggi 70 cm polybag 48,800
90 Araleya tinggi 50 cm pohon 17,500
91 Asoka Mini Daun Kecil pohon 15,900
92 Puring Bali tinggi 50 cm pohon 17,200
93 Songkap India pohon 69,000
94 Pucuk Merah tinggi 1 meter pohon 64,600
95 Pucuk Merah tinggi 2 meter pohon 143,700
96 Asoka jabon kecil Polibag 15,000
97 Kelapa Gading Lingkar batang 20 cm, tinggi 6 m pohon 1,322,500
98 Kamboja pagoda tinggi 70 cm Batang 90,500
99 Kemuning jepang Polybag 36,200
100 Trembesi Lingkar batang 10 cm, tinggi 2 m pohon 92,000
Pohon tinggi 2 m diameter 10 cm +
101 Trembesi Pohon 448,600
stegger + ongkos gali
102 Tanaman dalam pot buah jeruk Diameter pot minimal 1 meter pot 454,800
Tanaman dalam pot buah jambu
103 Tinggi
Tinggi Pot minimal
Tanaman minimal501 cm
meter, pot 564,900
kristal
tanaman dalam kondisi berbuah
104 Tanaman dalam pot buah sawo dalam pot sehat dan bebas hama pot 378,000
penyakit, media tanah kompak pot
105 Beringin Putih Tinggi 1 1/2 meter Pohon 310,600
tidak pecah / rusak
106 Bougenville Tinggi 1 meter Pohon 251,500
107 Song Of India Tinggi 1 1/2 meter Pohon 462,000
108 Asoka Farigata Tinggi 2 1/2 meter Pohon 503,100
109 Batavia Tinggi 1 meter Pohon 406,200
110 Cempaka Putih Tinggi 1 1/2 meter Pohon 452,200
111 Lady Palm Tinggi 1 meter Pohon 713,100
112 Areca Palm Tinggi 1 meter Pohon 416,800
113 Walisongo Tinggi 1 meter Pohon 392,400
114 Bambo Gladena Golden Tinggi 1 1/2 meter Pohon 303,300
115 Phillo Dendrom Tinggi 1 meter Pohon 508,800
116 Lidah Mertua Tinggi 1 meter Pohon 683,900
117 Bromelia Tinggi 1/2 meter Pohon 452,800
118 Ficus Karet Kebo Tinggi 2 meter Pohon 685,400
119 Palem Commodore Tinggi 1 1/2 meter Pohon 495,900
120 Alo Asia Tinggi 1 1/2 meter Pohon 507,200
121 Calthea Ornate Tinggi 1/2 meter Pohon 421,100
122 Spaty Phylum Tinggi 1/2 meter Pohon 503,100
123 Kantil Tinggi 2 meter Pohon 683,900
124 Cempaka Tinggi 1 1/2 meter Pohon 291,800
125 Kenanga Tinggi 1 1/2 meter Pohon 50,300
126 Palem Segitiga Tinggi 1 meter Pohon 209,400
127 Palem Serit Tinggi 1 meter Pohon 304,800
Pohon tinggi 2 m diameter 10 cm +
128 Pule Pohon 5,462,500
stegger + ongkos gali

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 470
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
129 Roron Phylatum Tinggi 1 meter Pohon 503,100
130 Keris Tinggi 1 meter Pohon 490,400

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 471
HARGA
NO. NAMA BARANG MERK SATUAN
(Rp.)
131 Zamia Tinggi 1 meter Pohon 517,500
132 Petris Tinggi 1 1/2 meter Pohon 312,000
133 Bunga Anyelir Pohon 165,300
134 Bunga air mata pengantin Pohon 128,600
135 Bunga baby blue Pohon 21,500
136 Bunga pukul 9 warna kuning Pohon 21,500
137 Seruni rambat polibag 23,000
138 Ruellia ungu tinggi 30 cm polibag 27,300
139 Tapak dara tinggi 30 cm polibag 17,900
140 Bidara (tanpa duri) 2 m pohon 326,300
141 Lili paris tinggi 30 cm polibag 7,100
142 Akalipa Merah (Ekor Kucing) 50 cm tinggi 50 cm pohon 21,500
143 Bunga Menanti Kasih polibag 20,100
144 Bunga Seribu Bintang tinggi 30 cm polibag 25,100
145 Bungur tinggi 2 meter pohon 370,500
146 Akasia emas tinggi 2 meter pohon 208,400
147 Sikat Botol merah tinggi 2 meter pohon 316,200
148 Bunga kupu - kupu tinggi 2 meter pohon 283,100
149 Bunga Lonina Merah polibag 48,800
150 Bunga abegia polibag 38,800
151 Beringin tinggi 1 meter pohon 150,900
152 Bunga lolipop tinggi 30 cm polibag 27,300
Akalipa Merah (Ekor Kucing) ± 1 m Tinggi 1 meter Polibag 80,500
Lancuran kuning ± 50 cm Tinggi 50 cm Polibag 57,500
lancuran merah ± 50 cm Tinggi 50 cm Polibag 56,000
SP JUMBI RDT TANKI AIR P : 180 cm ; 150 cc unit 48,173,500
MB 200 Long Radiator Hidrolik
p : 200 cm ; 200 cc unit 55,200,000
Otomatis Bak Sampah Full

Standar Satuan Harga Belanja Daerah Kabupaten Banyuwangi Tahun 2017 472
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk Satuan


ALAT OLAHRAGA OUTDOOR
1 Air Walker Set
2 Elliptical machine Set
3 Bicycle Set
4 Double sit up board Set
5 Horse rider machine Set
6 Double swing board Set
7 Double Children Press Board Set
SURVEY HARGA BAHAN BANGUNAN

Harga
(Rp.)

18,112,500
18,112,500
13,282,500
18,112,500
13,282,500
18,112,500
13,282,500
DAFTAR ANALISA SATUAN PEKERJAAN
PEMERINTAH KABUPATEN BANYUWANGI
TAHUN 2017

I. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN


6.1 1 m' Pagar sementara dari kayu tinggi 2 meter
6.1,1 Bahan
1.250 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
5.000 kg Semen PC @ Rp. 1,370.00
0.005 m3 Pasir beton @ Rp. 200,000.00
0.009 m3 Batu Krikil @ Rp. 141,750.00
0.072 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.060 kg Paku usuk 4" @ Rp. 14,000.00
6.1,2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.020 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
L.02 1 m' Pemagaran daerah kerja tiang kayu
Bahan
1.200 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
0.035 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.300 kg Paku seng @ Rp. 23,450.00
0.120 kg Paku usuk 4" @ Rp. 14,000.00
0.100 m3 Pasir pasang @ Rp. 185,000.00
12.000 kg Semen PC @ Rp. 1,370.00
Tenaga Jumlah (I)
0.180 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
L.02 1 m' Pemagaran daerah kerja tiang besi siku
Bahan
1.200 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
10.000 kg Besi siku @ Rp. 12,700.00
0.050 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
0.100 m3 Pasir pasang @ Rp. 185,000.00
12.000 kg Semen PC @ Rp. 1,370.00
Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Besi @ Rp. 75,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 1 m' Pagar sementara dari seng gelombang tinggi 2 meter
6,2,1 Bahan
1.250 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
2.500 kg Semen PC @ Rp. 1,370.00
1.200 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
0.005 m3 Pasir beton @ Rp. 200,000.00
0.009 m3 Batu Krikil @ Rp. 141,750.00
0.072 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.060 kg Paku usuk 4" @ Rp. 14,000.00
0.450 kg Cat menie (besi/kayu) sejenis cap Pedang @ Rp. 38,180.00
6,2,2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.020 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 1 m' Pagar sementara dari kawat duri tinggi 1,8 meter
6,3,1 Bahan
1.000 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
2.000 kg Semen PC @ Rp. 1,370.00
25 kg 25.000 m' Kawat berduri @ Rp. 1,850.00
0.005 m3 Pasir beton @ Rp. 200,000.00
0.009 m3 Batu Krikil @ Rp. 141,750.00
0.060 kg Paku usuk 4" @ Rp. 14,000.00
6,3,2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.020 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 1 m' Pengukuran dan Pemasangan bouwplank
6.4.1 Bahan
0.012 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.020 kg Paku usuk 4" @ Rp. 14,000.00
2/20 0.007 m3 Kayu lokal papan 2/20 x 4 m @ Rp. 4,945,000.00
6.4.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 m2 Pembuatan kantor sementara, dengan lantai plesteran
6,5,1 Bahan
1.250 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
0.180 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.080 kg Paku usuk 4" @ Rp. 14,000.00
1.100 kg Besi strip 2 cm @ Rp. 20,450.00
35.000 kg Semen PC @ Rp. 1,370.00
0.150 m3 Pasir pasang @ Rp. 185,000.00
0.100 m3 Pasir beton @ Rp. 200,000.00
0.150 m3 Batu Krikil @ Rp. 141,750.00
30.000 bh Batu bata merah @ Rp. 750.00
0.250 lbr Seng BJLs 28/ 0,9 x 1,8 @ Rp. 83,375.00
0.200 bh Kaca naco @ Rp. 7,550.00
0.080 m2 Kaca polos tebal 5 mm @ Rp. 86,050.00
0.150 bh Kunci tanam (808) @ Rp. 51,000.00
0.060 lmb Plywood tebal 4 mm @ Rp. 77,625.00
6,5,1 Tenaga Jumlah (I)
2.000 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
1.000 OH Tukang Batu @ Rp. 70,000.00
0.300 OH Kepala Tukang Batu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 1 m2 Pembuatan gudang semen dan alat - alat
6,6,1 Bahan
1.700 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
0.210 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
10.500 kg Semen PC @ Rp. 1,370.00
0.030 m3 Pasir beton @ Rp. 200,000.00
0.050 m3 Batu Krikil @ Rp. 141,750.00
1.500 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
0.250 lbr Seng BJLs 28/ 0,9 x 1,8 @ Rp. 83,375.00
6,6,2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 1 m2 Pembuatan rumah jaga / konstruksi kayu
6,7,1 Bahan
3.000 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
0.276 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.700 kg Paku usuk 4" @ Rp. 14,000.00
1,5 lbr 1.500 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
6,7,2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
1.500 OH Tukang Kayu @ Rp. 90,000.00
0.150 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
L.03 1 m2 Pembuatan direksi keet, los kerja dan gudang
6,6,1 Bahan
0.050 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.600 lbr Plywood tebal 4 mm @ Rp. 77,625.00
26.000 kg Semen PC @ Rp. 1,370.00
0.100 m3 Pasir pasang @ Rp. 185,000.00
1.000 lbr Asbes datar tebal 4 mm (60 x 200) @ Rp. 39,750.00
0.750 kg Paku usuk 4" @ Rp. 14,000.00
0.300 lbr Asbes gelombang besar tebal 5 mm @ Rp. 126,500.00
9.000 bh Paku asbes @ Rp. 500.00
0.700 m2 Flor lantai 1 : 3 : 5 @ Rp. 41,265.50
0.060 m2 Pintu double teakwood rangka kayu @ Rp. 632,900.00
1.000 daun Kaca naco @ Rp. 7,550.00
1.000 m2 Cat dinding / plafon @ Rp. 27,710.00
6,6,2 Tenaga Jumlah (I)
1.200 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Batu @ Rp. 70,000.00
0.040 OH Kepala Tukang Batu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 1 m2 Pembersihan lapangan dan perataan
6.8.1 Tenaga
0.100 OH Pekerja @ Rp. 60,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 1 m2 Pembuatan bedeng pekerja
6,9,1 Bahan
1.250 btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
0.186 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
18.000 kg Semen PC @ Rp. 1,370.00
0.030 m3 Pasir beton @ Rp. 200,000.00
0.050 m3 Batu Krikil @ Rp. 141,750.00
1.500 lbr Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
1.350 lbr Plywood tebal 4 mm @ Rp. 77,625.00
6,9,2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm
6,10,1 Bahan
0.036 m3 Acuan Kayu Begisting @ Rp. 3,090,150.00
0.080 kg Paku usuk 4" @ Rp. 14,000.00
0.014 btg Kayu lokal usuk 5/7 x 200/250 @ Rp. 42,262.50
6,10,2 Tenaga Jumlah (I)
0.300 OH Tukang Kayu @ Rp. 90,000.00
mandor 0.030 OH Kepala tukang kayu @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 1 m2 Pembuatan stegger/ perancah dari bambu, ukuran ( 40 x 50 x 25 ) cm
6,11,1 Bahan
1.250 btg Trucuk/bambu (3 m) @ Rp. 14,375.00
0.186 kg Ijuk @ Rp. 19,800.00
6,11,2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.I3 1 m3 Bongkaran beton bertulang
6.I3.1 Tenaga
6.667 13.334 OH Pekerja @ Rp. 60,000.00
0.333 0.666 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.I4 1 m3 Bongkaran dinding tembok bata
6.I4.1 Tenaga
6.667 OH Pekerja @ Rp. 60,000.00
0.033 0.333 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
B.40 1m3 Bongkar beton dengan Jack Hammer
6.I3.1 Bahan
0.600 2.50 L Pertamax @ Rp. 8,050.00
Peralatan Jumlah (I)
0.250 sewa/hr Sewa Jack Hammer @ Rp. 196,318.00
0.030 Tenaga Jumlah (II)
1.200 OH Pekerja @ Rp. 60,000.00
0.120 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
II. ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH
6.1 Menggali 1 m3 tanah biasa sedalam 1 meter
6.1.1 Tenaga
0.750 OH Pekerja @ Rp. 60,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Menggali 1 m3 tanah biasa sedalam 2 meter
6.2.1 Tenaga
0.900 OH Pekerja @ Rp. 60,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Menggali 1 m3 tanah biasa sedalam 3 meter
6.3.1 Tenaga
1.050 OH Pekerja @ Rp. 60,000.00
0.067 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Menggali 1 m3 tanah keras sedalam 1 meter
6.4.1 Tenaga
1.000 OH Pekerja @ Rp. 60,000.00
0.032 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Menggali 1 m3 tanah cadas sedalam 1 meter
6.5.1 Tenaga
1.500 OH Pekerja @ Rp. 60,000.00
0.060 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 Menggali 1 m3 tanah lumpur sedalam 1 meter
6.6.1 Tenaga
1.200 OH Pekerja @ Rp. 60,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 Mengerjakan 1 m2 stripping tanah tebing setinggi 1 meter
6.7.1 Tenaga
0.050 OH Pekerja @ Rp. 60,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Membuang 1 m3 tanah sejauh 30 meter
6.8.1 Tenaga
0.330 OH Pekerja @ Rp. 60,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9a Mengurug kembali 1 m3 galian tanah biasa sedalam 1 meter
6.9a.1 1/3 x galian Pekerjaan Galian @ Rp. 47,250.00
Harga setelah dibulatkan
6.9b Mengurug kembali 1 m3 galian tanah biasa sedalam 2 meter
6.9b.1 1/3 x galian Pekerjaan Galian @ Rp. 58,050.00
Harga setelah dibulatkan
6.9c Mengurug kembali 1 m3 galian tanah biasa sedalam 3 meter
6.9c.1 1/3 x galian Pekerjaan Galian @ Rp. 69,030.00
Harga setelah dibulatkan
6.9d Mengurug kembali 1 m3 galian tanah keras sedalam 1 meter
6.9d.1 1/3 x galian Pekerjaan Galian @ Rp. 62,880.00
Harga setelah dibulatkan
6.9e Mengurug kembali 1 m3 galian tanah cadas sedalam 1 meter
6.9e.1 1/3 x galian Pekerjaan Galian @ Rp. 95,400.00
Harga setelah dibulatkan
6.9f Mengurug kembali 1 m3 galian tanah lumpur sedalam 1 meter
6.9f.1 1/3 x galian Pekerjaan Galian @ Rp. 76,050.00
Harga setelah dibulatkan
6.10 Memadatkan 1 m3 tanah (per 20 cm)
6.10.1 Tenaga
0.500 OH Pekerja @ Rp. 60,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Mengurug 1 m3 pasir urug
6.11.1 Bahan
1.200 m3 Pasir urug @ Rp. 150,000.00
6.11.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 Memasang 1 m3 Lapisan pudel campuran 1 KP : 3 PP : 7 TL
6.12.1 Bahan
0.135 m3 Kapur pasang @ Rp. 409,600.00
0.400 m3 Pasir pasang @ Rp. 185,000.00
0.948 m3 Tanah liat @ Rp. 93,000.00
6.12.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Batu @ Rp. 70,000.00
0.040 OH Kepala Tukang Batu @ Rp. 90,000.00
0.080 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 Memasang 1 m3 Lapisan pudel campuran 1 KP : 5 TL
6.13.1 Bahan
0.248 m3 Kapur pasang @ Rp. 409,600.00
1.240 m3 Tanah liat @ Rp. 93,000.00
6.13.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Batu @ Rp. 70,000.00
0.040 OH Kepala Tukang Batu @ Rp. 90,000.00
0.080 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 Memasang 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan
6.14.1 Bahan
6.000 kg Ijuk @ Rp. 19,800.00
6.14.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga seteah dibulatkan
6.15 Mengurug 1 m3 sirtu padat
6.15.1 Bahan
1.200 m3 Sirtu @ Rp. 129,000.00
6.15.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Mengurug 1 m3 Tanah Urug
6.15.1 Bahan
1.200 m3 Tanah Urug @ Rp. 93,000.00
6.15.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
T.15 Timbunan tanah menggunakan buldozer
Bahan
10.800 Liter Solar @ Rp. 8,500.00
Tenaga Jumlah (I)
1.000 OJ Operator terampil @ Rp. 100,000.00
0.500 OJ Mekanik Terampil @ Rp. 110,000.00
Peralatan Jumlah (II)
1.000 Jam Sewa Buldozer @ Rp. 193,200.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
T.16 Galian tanah menggunakan excavator
Bahan
10.800 Liter Solar @ Rp. 8,500.00
Tenaga Jumlah (I)
1.000 OJ Operator terampil @ Rp. 100,000.00
0.500 OJ Mekanik Terampil @ Rp. 110,000.00
2.000 OJ Penjaga malam @ Rp. 50,000.00
Peralatan Jumlah (II)
1.000 Jam Sewa Excavator @ Rp. 276,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
T.17 Biaya operasional dump truck (mengangkut material tanah,jarak angkut 8 km/5m3)
Bahan
2.400 Liter Solar @ Rp. 8,500.00
Tenaga Jumlah (I)
1.000 OJ Sopir personil @ Rp. 105,000.00
1.000 OJ Pekerja @ Rp. 60,000.00
Peralatan Jumlah (II)
1.000 Jam Sewa Dumptruck @ Rp. 57,500.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
T.18 Biaya operasional vibro roller
Bahan
20.000 Liter Solar @ Rp. 8,500.00
Tenaga Jumlah (I)
1.000 OJ Operator terampil @ Rp. 100,000.00
0.500 OJ Mekanik Terampil @ Rp. 110,000.00
Peralatan Jumlah (II)
1.000 Jam Pemadat timbunan (Vibro Roller/stamper) @ Rp. 914.29
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
III. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI
6.1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP
6.1.1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
202.000 kg Semen PC @ Rp. 1,370.00
0.485 m3 Pasir pasang @ Rp. 185,000.00
6.1.2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
6.2.1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
163.000 kg Semen PC @ Rp. 1,370.00
0.520 m3 Pasir pasang @ Rp. 185,000.00
6.2.2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP
6.3.1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
136.000 kg Semen PC @ Rp. 1,370.00
0.544 m3 Pasir pasang @ Rp. 185,000.00
6.3.2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP
6,4,1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
117.000 kg Semen PC @ Rp. 1,370.00
0.561 m3 Pasir pasang @ Rp. 185,000.00
6,4,2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PP
6,5,1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
91.000 kg Semen PC @ Rp. 1,370.00
0.584 m3 Pasir pasang @ Rp. 185,000.00
6,5,2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 KP : 10 PP
6.7.1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
61.000 kg Semen PC @ Rp. 1,370.00
0.147 m3 Kapur pasang @ Rp. 409,600.00
0.492 m3 Pasir pasang @ Rp. 185,000.00
6.7.2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 m3 pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP
6,8,1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
41.000 kg Semen PC @ Rp. 1,370.00
0.131 m3 Kapur pasang @ Rp. 409,600.00
0.523 m3 Pasir pasang @ Rp. 185,000.00
6,8,2 Tenaga Jumlah (I)
1.500 OH Pekerja @ Rp. 60,000.00
0.750 OH Tukang Batu @ Rp. 70,000.00
0.075 OH Kepala Tukang Batu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 Memasang 1 m3 batu kosong (aanstamping)
6.9.1 Bahan
1.200 m3 Batu Belah 15/20 @ Rp. 120,100.00
0.432 m3 Pasir urug @ Rp. 150,000.00
6.9.2 Tenaga Jumlah (I)
0.780 OH Pekerja @ Rp. 60,000.00
0.390 OH Tukang Batu @ Rp. 70,000.00
0.039 OH Kepala Tukang Batu @ Rp. 90,000.00
0.039 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
6.10.1 Bahan
0.480 m3 Batu Belah 15/20 @ Rp. 120,100.00
194.000 kg Semen PC @ Rp. 1,370.00
0.312 m3 Pasir beton @ Rp. 200,000.00
0.468 m3 Batu Krikil @ Rp. 141,750.00
126.000 kg Besi beton polos @ Rp. 10,000.00
1.800 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
6.10.2 Tenaga Jumlah (I)
3.400 OH Pekerja @ Rp. 60,000.00
0.850 OH Tukang Batu @ Rp. 70,000.00
0.085 OH Kepala Tukang Batu @ Rp. 90,000.00
0.170 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm
6.11.1 Bahan
0.450 m3 Batu Belah 15/20 @ Rp. 120,100.00
194.000 kg Semen PC @ Rp. 1,370.00
0.312 m3 Pasir beton @ Rp. 200,000.00
0.468 m3 Batu Krikil @ Rp. 141,750.00
6.11.2 Tenaga Jumlah (I)
2.400 OH Pekerja @ Rp. 60,000.00
0.800 OH Tukang Batu @ Rp. 70,000.00
0.080 OH Kepala Tukang Batu @ Rp. 90,000.00
0.119 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
IV. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
B.01 1 m3 beton untuk lantai kerja (bedding)
Bahan
230.000 kg Semen PC @ Rp. 1,370.00
893.000 kg Pasir beton @ Rp. 142.86
1027.000 kg Batu Pecah @ Rp. 259.25
200.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.200 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.060 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1 1 m3 beton mutu f'c = 7,4 MPa ( K 100 ), slump ( 12 ± 2 ) cm, w/c = 0,87 (molen)
Bahan
247.000 kg Semen PC @ Rp. 1,370.00
869.000 kg Pasir beton @ Rp. 142.86
999.000 kg Batu Pecah @ Rp. 259.25
215.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.323 OH Pekerja @ Rp. 60,000.00
0.189 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 Hari Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 1 m3 beton mutu f'c = 9,8 MPa ( K 125 ), slump ( 12 ± 2 ) cm, w/c = 0,78 (molen)
Bahan
276.000 kg Semen PC @ Rp. 1,370.00
828.000 kg Pasir beton @ Rp. 142.86
1012.000 kg Batu Pecah @ Rp. 259.25
215.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.323 OH Pekerja @ Rp. 60,000.00
0.189 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 Hari Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 1 m3 beton mutu f'c = 12,2 MPa ( K 150 ), slump ( 12 ± 2 ) cm, w/c = 0,72 (molen)
Bahan
299.000 kg Semen PC @ Rp. 1,370.00
799.000 kg Pasir beton @ Rp. 142.86
1017.000 kg Batu Pecah @ Rp. 259.25
215.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.323 OH Pekerja @ Rp. 60,000.00
0.189 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 Hari Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 1 m3 lantai kerja beton mutu f'c = 7,4 MPa ( K 100 ), slump ( 3 - 6 ) cm, w/c = 0,87 (molen)
Bahan
230.000 kg Semen PC @ Rp. 1,370.00
893.000 kg Pasir beton @ Rp. 142.86
1027.000 kg Batu Pecah @ Rp. 259.25
200.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.200 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.060 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 Hari Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 m3 beton mutu f'c = 14,5 MPa ( K 175 ), slump ( 12 ± 2 ) cm, w/c = 0,66 (molen)
Bahan
326.000 kg Semen PC @ Rp. 1,370.00
760.000 kg Pasir beton @ Rp. 142.86
1029.000 kg Batu Pecah @ Rp. 259.25
215.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.323 OH Pekerja @ Rp. 60,000.00
0.189 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 Hari Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 m3 beton mutu f'c = 14,5 M Pa ( K 175 ), slump ( 12 ± 2 ) cm, w/c = 0,66 ready mix
Bahan
1.020 m3 Beton Ready Mix K 175 @ Rp. 925,750.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Standar @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 1 m3 beton mutu f'c = 19,3 M Pa ( K 225 ), slump ( 12 ± 2 ) cm, w/c = 0,58 (molen)
Bahan
371.000 kg Semen PC @ Rp. 1,370.00
698.000 kg Pasir beton @ Rp. 142.86
1047.000 kg Batu Pecah @ Rp. 259.25
215.000 liter Air @ Rp. 15.00
Tenaga Jumlah (I)
1.323 OH Pekerja @ Rp. 60,000.00
0.189 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.132 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.250 koef Sewa Mollen beton @ Rp. 138,000.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 1 m3 beton mutu f'c = 19,3 M Pa ( K 225 ), slump ( 12 ± 2 ) cm, w/c = 0,58 ready mix
Bahan
1.020 m3 Beton Ready Mix K 225 @ Rp. 943,000.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Standar @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 1 m3 beton mutu f'c = 21,7 M Pa ( K 250 ), slump ( 12 ± 2 ) cm, w/c = 0,56 ready mix
Bahan
1.020 m3 Beton Ready Mix K 250 @ Rp. 954,500.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Standar @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 1 m3 beton mutu f'c = 24,0 M Pa ( K 275 ), slump ( 12 ± 2 ) cm, w/c = 0,53 ready mix
Bahan
1.020 m3 Beton Ready Mix K 275 @ Rp. 966,000.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Standar @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 1 m3 beton mutu f'c = 26,4 M Pa ( K 300 ), slump ( 12 ± 2 ) cm, w/c = 0,52 ready mix
Bahan
1.020 m3 Beton Ready Mix K 300 @ Rp. 977,500.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Longbow @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 1 m3 beton mutu f'c = 31,2 M Pa ( K 350 ), slump ( 12 ± 2 ) cm, w/c = 0,48 ready mix
Bahan
1.020 m3 Beton Ready Mix K 350 @ Rp. 1,023,500.00
Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Peralatan Jumlah (II)
0.120 koef Pompa Beton Longbow @ Rp. 601,360.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai
Tabel berikut :
Bahan
448.000 kg Semen PC @ Rp. 1,370.00
667.000 kg Pasir beton @ Rp. 142.86
1000.000 kg Batu Pecah @ Rp. 259.25
200.000 Liter Air @ Rp. 15.00
Tenaga Jumlah (I)
2.100 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.105 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Pembesian 10 kg dengan besi polos
Bahan
10.500 kg Besi beton polos @ Rp. 10,000.00
0.150 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Besi @ Rp. 75,000.00
0.007 OH Kepala Tukang Besi @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Pembesian 10 kg dengan besi ulir
Bahan
10.500 kg Besi beton ulir @ Rp. 10,500.00
0.150 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Besi @ Rp. 75,000.00
0.007 OH Kepala Tukang Besi @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.18 Pembesian 10 kg kabel presstressed polos
Bahan
10.500 kg Besi beton polos @ Rp. 10,000.00
0.100 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
Tenaga Jumlah (I)
0.050 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Besi @ Rp. 75,000.00
0.005 OH Kepala Tukang Besi @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.19 Memasang 1 kg jaring kawat baja / wiremesh
Bahan
1.020 kg Warmes 2.4 x 5.1 (8 mm) @ Rp. 22,404.36
0.050 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
Tenaga Jumlah (I)
0.025 OH Pekerja @ Rp. 60,000.00
0.025 OH Tukang Besi @ Rp. 75,000.00
0.020 0.025 OH Kepala Tukang Besi @ Rp. 80,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
KOEFISIEN POMPA BETON STANDAR PER JAM
1.000 unit/6jmSewa Pompa Beton Standar @ Rp. 4,312,500.00
Jasa Pompa Beton per Jam
9.960 m3 Kapasitas Beton Per Jam (AHSP)
Jasa Pompa Per M3
Jasa Pompa Per Jam dibagi koef (AHSP) 0.12
Harga setelah dibulatkan
KOEFISIEN POMPA BETON LONGBOW PER JAM
1.000 unit/6jmSewa Pompa Beton Longbow @ Rp. 5,462,500.00
Jasa Pompa Beton per Jam
9.960 m3 Kapasitas Beton Per Jam (AHSP)
Jasa Pompa Per M3
Jasa Pompa Per Jam dibagi koef (AHSP) 0.12
Harga setelah dibulatkan
6.20 Memasang 1 m2 bekisting untuk pondasi
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
Tenaga Jumlah (I)
0.520 OH Pekerja @ Rp. 60,000.00
0.260 OH Tukang Kayu @ Rp. 90,000.00
0.026 OH Kepala Tukang kayu @ Rp. 90,000.00
0.026 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.21 Memasang 1 m2 bekisting untuk sloof
Bahan
0.045 m3 Kayu kelas III @ Rp. 3,450,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
Tenaga Jumlah (I)
0.520 OH Pekerja @ Rp. 60,000.00
0.260 OH Tukang Kayu @ Rp. 90,000.00
0.026 OH Kepala Tukang kayu @ Rp. 90,000.00
0.026 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.21 Memasang 1 m2 bekisting untuk sloof 2xpakai
Bahan
0.045 m3 Kayu kelas III @ Rp. 3,450,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
Jumlah 1x pakai
Tenaga Jumlah (I) 2x pakai
0.520 OH Pekerja @ Rp. 60,000.00
0.260 OH Tukang Kayu @ Rp. 90,000.00
0.026 OH Kepala Tukang kayu @ Rp. 90,000.00
0.026 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22 Memasang 1 m2 bekisting untuk kolom
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22 Memasang 1 m2 bekisting untuk kolom (menggunakan bambu)
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22 Memasang 1 m2 bekisting untuk kolom (menggunakan bambu) 2x pakai
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Jumlah 1x pakai
Tenaga Jumlah (I) 2x pakai
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 bekisting untuk balok
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.018 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 bekisting untuk balok (menggunakan bambu)
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.018 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 bekisting untuk balok (menggunakan bambu) 2x pakai
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.018 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Jumlah 1x pakai
Tenaga Jumlah (I) 2x pakai
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 bekisting untuk lantai
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
6.000 Btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 bekisting untuk plat lantai (menggunakan bambu)
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
6.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 bekisting untuk plat lantai (menggunakan bambu) 2xpakai
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
6.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Jumlah 1x pakai
Tenaga Jumlah (I) 2x pakai
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 bekisting untuk plat lantai (tanpa stegger)
Bahan
0.040 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m2 bekisting untuk dinding
Bahan
0.030 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.020 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
3.000 Btg Dolken kayu galam uk. 10/4 m @ Rp. 11,550.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m2 bekisting untuk dinding (menggunakan bambu)
Bahan
0.030 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.020 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
3.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 bekisting untuk dinding (menggunakan bambu) 2x pakai
Bahan
0.030 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.020 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
3.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Jumlah bahan 1x pakai
Tenaga Jumlah (I) bahan 2x pakai
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m2 bekisting untuk tangga
Bahan
0.030 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 bekisting untuk tangga (menggunakan bambu)
Bahan
0.030 m3 Kayu kelas III @ Rp. 3,450,000.00
0.400 kg Paku usuk 4" @ Rp. 14,000.00
0.015 m3 Balok ky. Kelas II @ Rp. 4,168,700.00
0.350 lbr Plywood tebal 6 mm @ Rp. 97,750.00
2.000 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.660 OH Pekerja @ Rp. 60,000.00
0.330 OH Tukang Kayu @ Rp. 90,000.00
0.033 OH Kepala Tukang kayu @ Rp. 90,000.00
0.033 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.26 Memasang 1 m2 jembatan untuk pengecoran beton
Bahan
0.0264 m3 Kayu kelas III (papan) @ Rp. 4,168,700.00
0.600 kg Paku usuk 4" @ Rp. 14,000.00
0.500 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.26 Memasang 1 m2 jembatan untuk pengecoran beton (menggunakan bambu)
Bahan
0.026 m3 Kayu kelas III (papan) @ Rp. 4,168,700.00
0.600 kg Paku usuk 4" @ Rp. 14,000.00
0.500 Btg Trucuk/bambu (3 m) @ Rp. 14,375.00
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
6.28.1 Bahan
0.200 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
1.500 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
6.28.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.262 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.28 Membuat 1 m3 strous beton (150 kg besi + bekisting)
6.28.1 Bahan
0.200 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
1.500 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
6.28.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.262 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
6.29.1 Bahan
0.270 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
2.000 kg Paku usuk 4" @ Rp. 14,000.00
210.000 kg Besi beton polos @ Rp. 10,000.00
3.000 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
6.29.2 Tenaga Jumlah (I)
5.650 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.560 OH Tukang kayu @ Rp. 90,000.00
1.400 OH Tukang Besi @ Rp. 75,000.00
0.323 OH Kepala Tukang Batu @ Rp. 90,000.00
0.283 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
6.30.1 Bahan
0.400 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
4.000 kg Paku usuk 4" @ Rp. 14,000.00
315.000 kg Besi beton polos @ Rp. 10,000.00
4.500 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
0.150 m3 Kayu balok @ Rp. 4,168,700.00
3.500 lembar Plywood tebal 6 mm @ Rp. 97,750.00
20.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.30.2 Tenaga Jumlah (I)
7.050 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.650 OH Tukang kayu @ Rp. 90,000.00
2.100 OH Tukang Besi @ Rp. 75,000.00
0.403 OH Kepala Tukang Batu @ Rp. 90,000.00
0.353 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) / menggunakan bambu
6.30.1 Bahan
0.400 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
4.000 kg Paku usuk 4" @ Rp. 14,000.00
315.000 kg Besi beton polos @ Rp. 10,000.00
4.500 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
0.150 m3 Kayu balok @ Rp. 4,168,700.00
3.500 lembar Plywood tebal 6 mm @ Rp. 97,750.00
20.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.30.2 Tenaga Jumlah (I)
7.050 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.650 OH Tukang kayu @ Rp. 90,000.00
2.100 OH Tukang Besi @ Rp. 75,000.00
0.403 OH Kepala Tukang Batu @ Rp. 90,000.00
0.353 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
6.31.1 Bahan
0.320 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
210.000 kg Besi beton polos @ Rp. 10,000.00
3.000 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
0.140 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
16.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.31.2 Tenaga Jumlah (I)
6.350 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.650 OH Tukang kayu @ Rp. 90,000.00
1.400 OH Tukang Besi @ Rp. 75,000.00
0.333 OH Kepala Tukang Batu @ Rp. 90,000.00
0.318 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) / menggunakan bambu
6.31.1 Bahan
0.320 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
210.000 kg Besi beton polos @ Rp. 10,000.00
3.000 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
0.140 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
16.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.31.2 Tenaga Jumlah (I)
6.350 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.650 OH Tukang kayu @ Rp. 90,000.00
1.400 OH Tukang Besi @ Rp. 75,000.00
0.333 OH Kepala Tukang Batu @ Rp. 90,000.00
0.318 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.32 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)
6.32.1 Bahan
0.320 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
0.120 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
32.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.32.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.265 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.32 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting) / menggunakan bambu
6.32.1 Bahan
0.320 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
0.120 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
32.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.32.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.265 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
6.33.1 Bahan
0.240 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
0.160 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
24.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.33.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.262 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) / menggunakan bambu
6.33.1 Bahan
0.240 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.200 kg Paku usuk 4" @ Rp. 14,000.00
157.500 kg Besi beton polos @ Rp. 10,000.00
2.250 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
0.160 m3 Kayu balok @ Rp. 4,168,700.00
2.800 lembar Plywood tebal 6 mm @ Rp. 97,750.00
24.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.33.2 Tenaga Jumlah (I)
5.300 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.300 OH Tukang kayu @ Rp. 90,000.00
1.050 OH Tukang Besi @ Rp. 75,000.00
0.262 OH Kepala Tukang Batu @ Rp. 90,000.00
0.265 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
6.34.1 Bahan
0.250 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.000 kg Paku usuk 4" @ Rp. 14,000.00
210.000 kg Besi beton polos @ Rp. 10,000.00
3.000 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
0.105 m3 Kayu balok @ Rp. 4,168,700.00
2.500 lembar Plywood tebal 6 mm @ Rp. 97,750.00
14.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.34.2 Tenaga Jumlah (I)
5.650 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.560 OH Tukang kayu @ Rp. 90,000.00
1.400 OH Tukang Besi @ Rp. 75,000.00
0.323 OH Kepala Tukang Batu @ Rp. 90,000.00
0.283 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) / menggunakan bambu
6.34.1 Bahan
0.250 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
3.000 kg Paku usuk 4" @ Rp. 14,000.00
210.000 kg Besi beton polos @ Rp. 10,000.00
3.000 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
336.000 kg Semen PC @ Rp. 1,370.00
0.540 m3 Pasir beton @ Rp. 200,000.00
0.810 m3 Batu Pecah @ Rp. 350,000.00
0.105 m3 Kayu balok @ Rp. 4,168,700.00
2.500 lembar Plywood tebal 6 mm @ Rp. 97,750.00
14.000 btg. Trucuk/bambu (3 m) @ Rp. 14,375.00
6.34.2 Tenaga Jumlah (I)
5.650 OH Pekerja @ Rp. 60,000.00
0.275 OH Tukang Batu @ Rp. 70,000.00
1.560 OH Tukang kayu @ Rp. 90,000.00
1.400 OH Tukang Besi @ Rp. 75,000.00
0.323 OH Kepala Tukang Batu @ Rp. 90,000.00
0.283 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
6.35.1 Bahan
0.002 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.010 kg Paku usuk 4" @ Rp. 14,000.00
3.000 kg Besi beton polos @ Rp. 10,000.00
0.045 0.450 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
4.000 kg Semen PC @ Rp. 1,370.00
0.006 m3 Pasir beton @ Rp. 200,000.00
0.009 m3 Batu Pecah @ Rp. 350,000.00
6.35.2 Tenaga Jumlah (I)
0.180 OH Pekerja @ Rp. 60,000.00
0.020 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Tukang kayu @ Rp. 90,000.00
0.020 OH Tukang Besi @ Rp. 75,000.00
0.006 OH Kepala Tukang Batu @ Rp. 90,000.00
0.009 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
6.36.1 Bahan
0.003 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
0.020 kg Paku usuk 4" @ Rp. 14,000.00
3.600 kg Besi beton polos @ Rp. 10,000.00
0.050 kg Bendrat/Kawat Ikat Beton @ Rp. 14,050.00
5.500 kg Semen PC @ Rp. 1,370.00
0.009 m3 Pasir beton @ Rp. 200,000.00
0.015 m3 Batu Pecah @ Rp. 350,000.00
6.36.2 Tenaga Jumlah (I)
0.297 OH Pekerja @ Rp. 60,000.00
0.033 OH Tukang Batu @ Rp. 70,000.00
0.033 OH Tukang kayu @ Rp. 90,000.00
0.033 OH Tukang Besi @ Rp. 75,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 5 Kr
6.1.1 Bahan
218.000 kg Semen PC @ Rp. 1,370.00
0.520 m3 Pasir pasang @ Rp. 185,000.00
0.870 m3 Kerikil Pecah @ Rp. 350,000.00
6.1.2 Tenaga Jumlah (I)
1.650 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.080 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
V. ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
6.1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
6.1.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
43.500 kg Semen PC @ Rp. 1,370.00
0.080 m3 Pasir pasang @ Rp. 185,000.00
6.1.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
6.2.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
32.950 kg Semen PC @ Rp. 1,370.00
0.091 m3 Pasir pasang @ Rp. 185,000.00
6.2.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
6.3.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
26.550 kg Semen PC @ Rp. 1,370.00
0.093 m3 Pasir pasang @ Rp. 185,000.00
6.3.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
6.4.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
22.200 kg Semen PC @ Rp. 1,370.00
0.102 m3 Pasir pasang @ Rp. 185,000.00
6.4.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP
6.5.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
18.500 kg Semen PC @ Rp. 1,370.00
0.122 m3 Pasir pasang @ Rp. 185,000.00
6.5.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP
6.6.1 Bahan
140.000 buah Batu bata merah @ Rp. 750.00
10.080 kg Semen PC @ Rp. 1,370.00
0.0925 m3 Pasir pasang @ Rp. 185,000.00
0.0275 m3 Kapur pasang @ Rp. 409,600.00
6.6.2 Tenaga Jumlah (I)
0.600 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 2 PP
6.7.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
18.950 kg Semen PC @ Rp. 1,370.00
0.038 m3 Pasir pasang @ Rp. 185,000.00
6.7.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 3 PP
6.8.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
14.370 kg Semen PC @ Rp. 1,370.00
0.040 m3 Pasir pasang @ Rp. 185,000.00
6.8.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 4 PP
6.9.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
11.500 kg Semen PC @ Rp. 1,370.00
0.043 m3 Pasir pasang @ Rp. 185,000.00
6.9.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 5 PP
6.10.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
9.680 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
6.10.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 6 PP
6.11.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
8.320 kg Semen PC @ Rp. 1,370.00
0.049 m3 Pasir pasang @ Rp. 185,000.00
6.11.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 8 PP
6.12.1 Bahan
70.000 buah Batu bata merah @ Rp. 750.00
6.500 kg Semen PC @ Rp. 1,370.00
0.050 m3 Pasir pasang @ Rp. 185,000.00
6.12.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
6.22.1 Bahan
30.000 buah Roster @ Rp. 8,625.00
11.000 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6.22.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 P
6.23.1 Bahan
30.000 buah Roster @ Rp. 8,625.00
11.000 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6.23.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 dinding bata berongga ekspos ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 P
6,24,1 Bahan
70.000 buah Bata berongga ekspos @ Rp. 800.00
14.000 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6,24,2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
VI. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
6.1 Memasang 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm
6,1,1 Bahan
15.504 kg Semen PC @ Rp. 1,370.00
0.016 m3 Pasir pasang @ Rp. 185,000.00
6,1,2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm
6.2.1 Bahan
10.224 kg Semen PC @ Rp. 1,370.00
0.020 m3 Pasir pasang @ Rp. 185,000.00
6.2.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
6.3.1 Bahan
7.776 kg Semen PC @ Rp. 1,370.00
0.023 m3 Pasir pasang @ Rp. 185,000.00
6.3.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
6.4.1 Bahan
6.240 kg Semen PC @ Rp. 1,370.00
0.024 m3 Pasir pasang @ Rp. 185,000.00
6.4.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
6.5.1 Bahan
5.184 kg Semen PC @ Rp. 1,370.00
0.026 m3 Pasir pasang @ Rp. 185,000.00
6.5.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 15 mm
6,6,1 Bahan
4.416 kg Semen PC @ Rp. 1,370.00
0.027 m3 Pasir pasang @ Rp. 185,000.00
6,6,2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 Memasang 1 m2 plesteran 1 PC : 7 PP, tebal 15 mm
3,7,1 Bahan
3.936 kg Semen PC @ Rp. 1,370.00
0.028 m3 Pasir pasang @ Rp. 185,000.00
6,7,2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 m2 plesteran 1 PC : 8 PP, tebal 15 mm
6,8,1 Bahan
3.456 kg Semen PC @ Rp. 1,370.00
0.029 m3 Pasir pasang @ Rp. 185,000.00
6,8,2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 Memasang 1 m2 plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm
6,9,1 Bahan
5.760 kg Semen PC @ Rp. 1,370.00
0.003 m3 Kapur pasang @ Rp. 409,600.00
0.013 m3 Pasir pasang @ Rp. 185,000.00
6,9,2 Tenaga Jumlah (I)
0.360 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Batu @ Rp. 70,000.00
0.012 OH Kepala Tukang Batu @ Rp. 90,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 Memasang 1 m2 plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm
6.10.1 Bahan
3.000 kg Semen PC @ Rp. 1,370.00
0.005 m3 Kapur pasang @ Rp. 409,600.00
0.020 m3 Pasir pasang @ Rp. 185,000.00
6.10.2 Tenaga Jumlah (I)
0.360 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Batu @ Rp. 70,000.00
0.012 OH Kepala Tukang Batu @ Rp. 90,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m2 plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm
6,11,1 Bahan
0.009 m3 Semen PC @ Rp. 1,370.00
0.009 m3 Kapur pasang @ Rp. 409,600.00
0.009 m3 Pasir pasang @ Rp. 185,000.00
6,11,2 Tenaga Jumlah (I)
0.440 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Batu @ Rp. 70,000.00
0.012 OH Kepala Tukang Batu @ Rp. 90,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm
6,12,1 Bahan
0.007 m3 Semen PC @ Rp. 1,370.00
0.007 m3 Kapur pasang @ Rp. 409,600.00
0.015 m3 Pasir pasang @ Rp. 185,000.00
6,12,2 Tenaga Jumlah (I)
0.360 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Batu @ Rp. 70,000.00
0.012 OH Kepala Tukang Batu @ Rp. 90,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm
6,13,1 Bahan
13.632 kg Semen PC @ Rp. 1,370.00
0.027 m3 Pasir pasang @ Rp. 185,000.00
6,13,2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.022 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm
6,14,1 Bahan
10.368 kg Semen PC @ Rp. 1,370.00
0.031 m3 Pasir pasang @ Rp. 185,000.00
6,14,2 Tenaga Jumlah (I)
0.260 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm
6,15,1 Bahan
8.320 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6,15,2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.022 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.16 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm
6,16,1 Bahan
6.912 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6,16,2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.022 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 20 mm
6,17,1 Bahan
5.888 kg Semen PC @ Rp. 1,370.00
0.036 m3 Pasir pasang @ Rp. 185,000.00
6,17,2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Batu @ Rp. 70,000.00
0.020 OH Kepala Tukang Batu @ Rp. 90,000.00
0.022 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.18 Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm
6,18,1 Bahan
0.009 m3 Semen PC @ Rp. 1,370.00
0.009 m3 Kapur pasang @ Rp. 409,600.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
6,18,2 Tenaga Jumlah (I)
0.400 0.440 OH Pekerja @ Rp. 60,000.00
0.220 OH Tukang Batu @ Rp. 70,000.00
0.022 OH Kepala Tukang Batu @ Rp. 90,000.00
0.022 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.19 Memasang 1 m2 Berapen 1 PC : 5 PP, tebal 15 mm
6.19.1 Bahan
5.184 kg Semen PC @ Rp. 1,370.00
0.026 m3 Pasir pasang @ Rp. 185,000.00
6.19.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Batu @ Rp. 70,000.00
0.008 OH Kepala Tukang Batu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.20 Memasang 1 m’ Plesteran Skoning 1 PC : 2 PP, lebar 10 mm
6.20.1 Bahan
0.500 kg Semen PC @ Rp. 1,370.00
0.013 m3 Pasir pasang @ Rp. 185,000.00
6.20.2 Tenaga Jumlah (I)
0.080 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Batu @ Rp. 70,000.00
0.040 OH Kepala Tukang Batu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m’ Plesteran Skoning 1 PC : 3 PP, lebar 10 mm
6.20.1 Bahan
0.500 kg Semen PC @ Rp. 1,370.00
0.013 m3 Pasir pasang @ Rp. 185,000.00
6.20.2 Tenaga Jumlah (I)
0.080 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Batu @ Rp. 70,000.00
0.040 OH Kepala Tukang Batu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 Plesteran Ciprat 1 PC : 2 PP
6.23.1 Bahan
4.320 kg Semen PC @ Rp. 1,370.00
0.006 m3 Pasir pasang @ Rp. 185,000.00
6.23.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 finishing siar pasangan dinding bata merah (=20 m’)
6.24.1 Bahan
3.180 3.108 kg Semen PC @ Rp. 1,370.00
6.24.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Batu @ Rp. 70,000.00
0.008 OH Kepala Tukang Batu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m’)
6.25.1 Bahan
1.600 kg Semen PC @ Rp. 1,370.00
6.25.2 Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.035 OH Tukang Batu @ Rp. 70,000.00
0.004 OH Kepala Tukang Batu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.26 Memasang 1 m2 finishing siar pasangan batu kali campuran 1 PC : 2 PP
6.26.1 Bahan
6.340 kg Semen PC @ Rp. 1,370.00
0.012 m3 Pasir pasang @ Rp. 185,000.00
6.26.2 Tenaga Jumlah (I)
0.300 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Batu @ Rp. 70,000.00
0.015 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.27 Memasang 1 m2 acian
6.27.1 Bahan
3.250 kg Semen PC @ Rp. 1,370.00
6.27.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.27 Memasang 1 m' benangan
6.27.1 Bahan
3.000 kg Semen PC @ Rp. 1,370.00
6.27.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Batu @ Rp. 70,000.00
0.010 OH Kepala Tukang Batu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
VII. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
6.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I ( ky. Jati )
6.1.1 Bahan
1.100 m3 Kayu jati balok 8/12, 6/12 @ Rp. 19,001,200.00
1.250 kg Paku usuk 4" @ Rp. 14,000.00
1.000 kg Lem kayu @ Rp. 28,750.00
6.1.2 Tenaga Jumlah (I)
7.000 OH Pekerja @ Rp. 60,000.00
21.000 OH Tukang Kayu @ Rp. 90,000.00
2.100 OH Kepala Tukang kayu @ Rp. 90,000.00
0.350 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II ( ky. Kamper )
6.2.1 Bahan
1.200 m3 Kayu kamper balok 6/12 @ Rp. 9,660,000.00
1.250 kg Paku usuk 4" @ Rp. 14,000.00
1.000 kg Thinner @ Rp. 21,000.00
6.2.2 Tenaga Jumlah (I)
6.000 OH Pekerja @ Rp. 60,000.00
18.000 OH Tukang Kayu @ Rp. 90,000.00
1.800 OH Kepala Tukang kayu @ Rp. 90,000.00
0.300 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II ( ky. Kamper )
6.3.1 Bahan
0.040 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.050 kg Paku usuk 4" @ Rp. 14,000.00
6.3.2 Tenaga Jumlah (I)
0.350 OH Pekerja @ Rp. 60,000.00
1.050 OH Tukang Kayu @ Rp. 90,000.00
0.105 OH Kepala Tukang kayu @ Rp. 90,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5a Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I ( ky. Jati )
6.5a.1 Bahan
0.040 m3 Kayu jati papan 2/20 x 2 m @ Rp. 18,174,450.00
0.500 kg Paku usuk 4" @ Rp. 14,000.00
6.5a.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
3.000 OH Tukang Kayu @ Rp. 90,000.00
0.300 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5b Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II (ky kamper)
6.5b.1 Bahan
0.040 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.500 kg Paku usuk 4" @ Rp. 14,000.00
6.5b.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
3.000 OH Tukang Kayu @ Rp. 90,000.00
0.300 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6a Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I (kayu jati)
6.6.1 Bahan
0.024 m3 Kayu jati papan 2/20 x 2 m @ Rp. 18,174,450.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
6.6.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
2.400 OH Tukang Kayu @ Rp. 90,000.00
0.240 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6b Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II (kayu kamper)
6.6.1 Bahan
0.024 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.300 kg Paku usuk 4" @ Rp. 14,000.00
6.6.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
2.400 OH Tukang Kayu @ Rp. 90,000.00
0.240 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7a Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I (kayu jati)
6.7.1 Bahan
0.064 m3 Kayu jati papan 2/20 x 2 m @ Rp. 18,174,450.00
0.500 kg Lem kayu @ Rp. 28,750.00
6.7.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
3.000 OH Tukang Kayu @ Rp. 90,000.00
0.300 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7b Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas II (kayu kamper)
6.7.1 Bahan
0.064 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.500 kg Lem kayu @ Rp. 28,750.00
6.7.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
3.000 OH Tukang Kayu @ Rp. 90,000.00
0.300 OH Kepala Tukang kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamper (lebar sampai 90 cm)
6.8.1 Bahan
0.025 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.030 kg Paku reng 2" @ Rp. 11,875.00
0.500 kg Lem kayu @ Rp. 28,750.00
1.000 lembar Plywood tebal 4 mm @ Rp. 77,625.00
6.8.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
2.100 OH Tukang Kayu @ Rp. 90,000.00
0.210 OH Kepala Tukang kayu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9a Membuat 1 m2 pintu plywood rangkap, rangka expose kayu jati
6.9.1 Bahan
0.0256 m3 Kayu jati papan 2/20 x 2 m @ Rp. 18,174,450.00
0.030 kg Paku reng 2" @ Rp. 11,875.00
0.500 kg Lem kayu @ Rp. 28,750.00
1.000 lembar Plywood tebal 4 mm @ Rp. 77,625.00
6.9.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
2.400 OH Tukang Kayu @ Rp. 90,000.00
0.240 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9b Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kamper
6.9.1 Bahan
0.0256 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.030 kg Paku reng 2" @ Rp. 11,875.00
0.500 kg Lem kayu @ Rp. 28,750.00
1.000 lembar Plywood tebal 4 mm @ Rp. 77,625.00
6.9.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
2.400 OH Tukang Kayu @ Rp. 90,000.00
0.240 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10a Memasang 1 m2 jalusi kusen, kayu jati
6.10.1 Bahan
0.060 m3 Kayu jati usuk 5/7, 4/6, 3/5 @ Rp. 14,044,150.00
0.150 kg Paku reng 2" @ Rp. 11,875.00
6.10.2 Tenaga Jumlah (I)
0.670 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10b Memasang 1 m2 jalusi kusen, kayu kamper
6.10.1 Bahan
0.060 m3 Kayu kamper usuk 5/7 @ Rp. 7,187,500.00
0.150 kg Paku reng 2" @ Rp. 11,875.00
6.10.2 Tenaga Jumlah (I)
0.670 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10b Memasang 1 m2 jalusi kusen, kayu ulin
6.10.1 Bahan
0.060 m3 Kayu Ulin (Papan) @ Rp. 17,500,000.00
0.150 kg Paku reng 2" @ Rp. 11,875.00
6.10.2 Tenaga Jumlah (I)
0.670 OH Pekerja @ Rp. 60,000.00
2.000 OH Tukang Kayu @ Rp. 90,000.00
0.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m2 teakwood rangkap, rangka expose kayu kamper
6.11.1 Bahan
0.025 m3 Kayu kamper usuk 5/7 @ Rp. 7,187,500.00
0.030 kg Paku reng 2" @ Rp. 11,875.00
0.300 kg Lem kayu @ Rp. 28,750.00
1.000 lembar Teakwood tebal 4 mm @ Rp. 123,625.00
6.11.2 Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
2.400 OH Tukang Kayu @ Rp. 90,000.00
0.240 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kruing
6.13.1 Bahan
1.100 m3 Kayu kruing balok 8/12 @ Rp. 7,935,000.00
15.000 kg Besi strip 2 cm @ Rp. 20,450.00
5.600 kg Paku dur 5" @ Rp. 8,450.00
6.13.2 Tenaga Jumlah (I)
4.000 OH Pekerja @ Rp. 60,000.00
12.000 OH Tukang Kayu @ Rp. 90,000.00
1.200 OH Kepala Tukang kayu @ Rp. 90,000.00
0.200 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 Memasang 1 m3 konstruksi kuda-kuda expose, kayu kelas I / ky.jati
6.14.1 Bahan
1.200 m3 Kayu jati balok 8/12, 6/12 @ Rp. 19,001,200.00
15.000 kg Besi strip 2 cm @ Rp. 20,450.00
5.600 kg Paku dur 5" @ Rp. 8,450.00
6.14.2 Tenaga Jumlah (I)
6.700 OH Pekerja @ Rp. 60,000.00
20.010 OH Tukang Kayu @ Rp. 90,000.00
2.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Memasang 1 m3 konstruksi gordeng, kayu kelas II / ky.meranti
6.15.1 Bahan
1.100 m3 Kayu meranti balok 6/12 @ Rp. 5,750,000.00
15.000 kg Besi strip 2 cm @ Rp. 20,450.00
3.000 kg Paku dur 5" @ Rp. 8,450.00
6.15.2 Tenaga Jumlah (I)
2.400 6.700 OH Pekerja @ Rp. 60,000.00
7.200 20.100 OH Tukang Kayu @ Rp. 90,000.00
0.720 2.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.120 0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Memasang 1 m3 konstruksi gordeng, kayu kelas II / ky.kruing
6.15.1 Bahan
1.100 m3 Kayu kruing balok 8/12 @ Rp. 7,935,000.00
15.000 kg Besi strip 2 cm @ Rp. 20,450.00
3.000 kg Paku dur 5" @ Rp. 8,450.00
6.15.2 Tenaga Jumlah (I)
2.400 6.700 OH Pekerja @ Rp. 60,000.00
7.200 20.100 OH Tukang Kayu @ Rp. 90,000.00
0.720 2.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.120 0.335 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.16 Memasang 1 m2 rangka atap genteng keramik, kayu kelas I / usuk ky. Kruing, reng kamper
6.16.1 Bahan
0.014 m3 Kayu kruing usuk 5/7 @ Rp. 6,037,500.00
0.0036 0.0360 m3 Kayu kamper reng 2/3, 3/5 @ Rp. 7,187,500.00
0.250 kg Paku usuk 4" @ Rp. 14,000.00
6.16.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Memasang 1 m2 rangka atap genteng beton, kayu kelas II / usuk ky. Kruing, reng kamper
6.17.1 Bahan
0.014 m3 Kayu kruing usuk 5/7 @ Rp. 6,037,500.00
0.0057 0.0570 m3 Kayu kamper reng 2/3, 3/5 @ Rp. 7,187,500.00
0.250 kg Paku usuk 4" @ Rp. 14,000.00
6.17.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.18 Memasang 1 m2 rangka atap sirap, kayu kelas II / ky.kruing
6.18.1 Bahan
0.014 m3 Kayu kruing balok 6/12 @ Rp. 7,935,000.00
0.057 kg Paku usuk 4" @ Rp. 14,000.00
6.18.2 Tenaga Jumlah (I)
0.120 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Kayu @ Rp. 90,000.00
0.012 OH Kepala Tukang kayu @ Rp. 90,000.00
0.006 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.19 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III / ky. meranti
6.19.1 Bahan
0.0154 m3 Kayu meranti usuk 5/7 @ Rp. 4,887,500.00
0.200 kg Paku usuk 4" @ Rp. 14,000.00
6.19.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang Kayu @ Rp. 90,000.00
0.030 OH Kepala Tukang kayu @ Rp. 90,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.20 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III / ky. meranti
6.20.1 Bahan
0.0163 m3 Kayu meranti usuk 5/7 @ Rp. 4,887,500.00
0.250 kg Paku usuk 4" @ Rp. 14,000.00
6.20.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang Kayu @ Rp. 90,000.00
0.030 OH Kepala Tukang kayu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II / ky. Kamper
6.21a.1 Bahan
0.0108 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.100 kg Paku usuk 4" @ Rp. 14,000.00
6.21a.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.21a Memasang 1 m1 lisplank ukuran (2 x 20) cm, kayu kelas I atau kelas II / ky. Kamper
6.21a.1 Bahan
0.011 m3 Kayu kamper papan 2/20 x 4 m @ Rp. 11,500,000.00
0.100 kg Paku usuk 4" @ Rp. 14,000.00
6.21a.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.21b Memasang 1 m1 lisplank ukuran (2 x 20) cm, kayu kelas I atau kelas II / ky. Meranti
6.21b.1 Bahan
0.011 m3 Kayu meranti papan 2/20 x 4 m @ Rp. 6,497,500.00
0.100 kg Paku usuk 4" @ Rp. 14,000.00
6.21b.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22a Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II / ky. Kamper
6.22a.1 Bahan
0.011 m3 Kayu kamper papan 2/30 x 4 m @ Rp. 11,500,000.00
0.050 kg Paku usuk 4" @ Rp. 14,000.00
6.22a.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22b Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II / ky. Meranti
6.22b.1 Bahan
0.011 m3 Kayu meranti papan 3/20 x 4 m @ Rp. 6,497,500.00
0.050 kg Paku usuk 4" @ Rp. 14,000.00
6.22b.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III / ky. Meranti
6.23.1 Bahan
0.028 m3 Kayu meranti balok 6/12 @ Rp. 5,750,000.00
0.150 kg Paku usuk 4" @ Rp. 14,000.00
6.23.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Kayu @ Rp. 90,000.00
0.045 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II / ky. Meranti
6.24.1 Bahan
0.028 m3 Kayu meranti balok 6/12 @ Rp. 5,750,000.00
0.150 kg Paku usuk 4" @ Rp. 14,000.00
0.860 lembar Teakwood tebal 4 mm @ Rp. 123,625.00
0.560 kg Lem kayu @ Rp. 28,750.00
6.24.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Kayu @ Rp. 90,000.00
0.045 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II / ky. Meranti
6.25.1 Bahan
0.028 m3 Kayu meranti balok 6/12 @ Rp. 5,750,000.00
0.150 kg Paku usuk 4" @ Rp. 14,000.00
0.860 lembar Teakwood tebal 4 mm @ Rp. 123,625.00
0.560 kg Lem kayu @ Rp. 28,750.00
6.25.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.600 OH Tukang Kayu @ Rp. 90,000.00
0.060 OH Kepala Tukang kayu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pasang usuk ky.kruing 5/7 dan reng ky.kamper 2/3
Bahan
0.011 m3 Kayu meranti usuk 5/7 @ Rp. 4,887,500.00
0.004 m3 Kayu kamper reng 2/3, 3/5 @ Rp. 7,187,500.00
0.025 kg Paku usuk 4" @ Rp. 14,000.00
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Pasang papan reuter (analis BOW)
Bahan
0.004 m3 Kayu meranti papan 2/20 x 4 m @ Rp. 6,497,500.00
0.020 kg Paku reng 2" @ Rp. 11,875.00
Tenaga Jumlah (I)
0.028 OH Pekerja @ Rp. 60,000.00
0.080 OH Tukang Kayu @ Rp. 90,000.00
0.008 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m1 Calsiplank (20 x 1)
Bahan
0.367 Lmbr Kalsiplank 9 mm @ Rp. 78,775.00
0.180 Lnjr Hollow 2/4 - 4m @ Rp. 25,875.00
0.100 kg Paku reng 2" @ Rp. 11,875.00
Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 Bh Pintu PVC Lengkap
Bahan
1.100 m Pintu PVC lengkap @ Rp. 273,125.00
Tenaga Jumlah (I)
0.206 OH Pekerja @ Rp. 60,000.00
0.206 OH Tukang Kayu @ Rp. 90,000.00
0.021 OH Kepala Tukang kayu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
VIII. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI DAN DINDING
Memasang 1 m2 lantai ubin PC abu-abu ukuran 30 cm x 30 cm
6.5a.1 Bahan
11.870 buah Tegel teraso 30 x 30 cm @ Rp. 4,454.55
10.000 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
6.5b.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.125 OH Tukang batu @ Rp. 70,000.00
0.013 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5a Memasang 1 m2 lantai tegel badak hitam ( 30 x 30 ) cm
6.5a.1 Bahan
11.870 buah Tegel Badag Hitam 30/30 @ Rp. 4,559.09
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
6.5b.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.125 OH Tukang Batu @ Rp. 70,000.00
0.013 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5b Memasang 1 m2 lantai tegel badak merah ( 30 x 30 ) cm
6.5b.1 Bahan
11.870 buah Tegel Badag Merah 30/30 @ Rp. 4,559.09
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
6.5b.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.125 OH Tukang Batu @ Rp. 70,000.00
0.013 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 Memasang 1 m2 lantai ubin warna ( 20 x 20 ) cm
6.6.1 Bahan
26.500 buah Ubin warna 20 x 20 cm @ Rp. 1,868.00
10.400 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.620 1.000 kg Semen Warna @ Rp. 316.25
6.6.2 Tenaga Jumlah (I)
0.270 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Batu @ Rp. 70,000.00
0.014 OH Kepala Tukang Batu @ Rp. 90,000.00
0.014 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8a Memasang 1 m2 lantai ubin teraso ( 30 x 30 ) cm
6.8a.1 Bahan
11.870 buah Tegel teraso 30 x 30 cm @ Rp. 4,454.55
10.000 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.500 kg Semen Warna @ Rp. 316.25
6.8a.2 Tenaga Jumlah (I)
0.260 OH Pekerja @ Rp. 60,000.00
0.130 OH Tukang Batu @ Rp. 70,000.00
0.013 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8b Memasang 1 m2 lantai ubin teraso ( 20 x 20 ) cm
6.8b.1 Bahan
26.500 buah Tegel teraso 20 x 20 cm @ Rp. 2,292.00
10.400 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.620 m3 Semen Warna @ Rp. 316.25
6.8b.2 Tenaga Jumlah (I)
0.270 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Batu @ Rp. 70,000.00
0.014 OH Kepala Tukang Batu @ Rp. 90,000.00
0.014 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Memasang 1 m2 lantai ubin PC abu - abu ( 20 x 20 ) cm
6.3.1 Bahan
26.500 buah Tegel PC abu-abu 20 x 20 cm @ Rp. 1,574.00
10.400 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
6.3.2 Tenaga Jumlah (I)
0.270 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Batu @ Rp. 70,000.00
0.014 OH Kepala Tukang Batu @ Rp. 90,000.00
0.014 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.32 Memasang 1 m2 lantai keramik artistik ukuran (10 x 20) cm
6.32.1 Bahan
53.000 buah Tegel keramik 10 x 20 cm motif @ Rp. 1,455.00
8.190 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
2.750 kg Semen Warna @ Rp. 316.25
6.32.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35a Memasang 1 m2 lantai keramik ukuran (30 x 30) cm / polos
6.35a.1 Bahan
11.80 1.050 doos Tegel keramik 30 x 30 cm polos @ Rp. 47,000.00
10.000 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.50 0.500 kg Semen Warna @ Rp. 316.25
6.35a.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35b Memasang 1 m2 lantai keramik ukuran (30 x 30) cm / warna / motif / tekstur
6.35b.1 Bahan
11.80 1.050 doos Tegel keramik 30 x 30 cm motif @ Rp. 49,000.00
10.000 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.50 0.500 kg Semen Warna @ Rp. 316.25
6.35b.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35c Memasang 1 m2 lantai keramik ukuran (40 x 40) cm / polos
6.35c.1 Bahan
6.630 buah Tegel keramik 40 x 40 cm polos @ Rp. 8,376.00
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.300 kg Semen Warna @ Rp. 316.25
6.35c.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35d Memasang 1 m2 lantai keramik ukuran (40 x 40) cm / warna / motif / tekstur
6.35d.1 Bahan
6.630 buah Tegel keramik 40 x 40 cm motif @ Rp. 9,088.00
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.300 kg Semen Warna @ Rp. 316.25
6.35d.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.36a Memasang 1 m2 lantai keramik ukuran (20 x 20) cm / polos
6.36a.1 Bahan
26.50 1.050 doos Tegel keramik 20 x 20 cm polos @ Rp. 2,120.00
10.400 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.62 0.500 kg Semen Warna @ Rp. 316.25
6.36a.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.36b Memasang 1 m2 lantai keramik ukuran (20 x 20) cm / warna / motif / tekstur
6.36b.1 Bahan
26.50 1.050 doos Tegel keramik 20 x 20 cm motif @ Rp. 2,460.00
10.400 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.62 0.500 kg Semen Warna @ Rp. 316.25
6.36b.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.39 Memasang 1 m’ plint keramik ukuran (10 x 20) cm
6.39.1 Bahan
5.300 buah Tegel keramik 10 x 20 cm motif @ Rp. 1,455.00
1.140 kg Semen PC @ Rp. 1,370.00
0.003 m3 Pasir pasang @ Rp. 185,000.00
0.025 kg Semen Warna @ Rp. 316.25
6.39.2 Tenaga Jumlah (I)
0.090 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Batu @ Rp. 70,000.00
0.0035 0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m’ plint kuku macan
Bahan
12.000 buah Kuku Macan @ Rp. 920.00
0.114 kg Semen PC @ Rp. 1,370.00
0.001 m3 Pasir pasang @ Rp. 185,000.00
0.005 kg Semen Warna @ Rp. 316.25
Tenaga Jumlah (I)
0.090 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Batu @ Rp. 70,000.00
0.009 OH Kepala Tukang Batu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.44 Memasang 1 m2 lantai karpet
6.39.1 Bahan
1.050 m2 Karpet @ Rp. 19,360.00
0.350 kg Lem kayu @ Rp. 28,750.00
6.39.2 Tenaga Jumlah (I)
0.170 OH Pekerja @ Rp. 60,000.00
0.170 OH Tukang Kayu @ Rp. 90,000.00
0.017 OH Kepala Tukang kayu @ Rp. 90,000.00
0.009 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Parquet Kayu
Bahan
1.050 m2 Parquet kayu jati @ Rp. 363,489.00
0.600 kg Lem kayu @ Rp. 28,750.00
Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Kayu @ Rp. 90,000.00
0.035 OH Kepala Tukang kayu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Kayu Gymfloor
Bahan
1.050 m2 Parquet Gymfloor @ Rp. 450,000.00
0.600 kg Lem kayu @ Rp. 28,750.00
Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Kayu @ Rp. 90,000.00
0.035 OH Kepala Tukang kayu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.44 Memasang 1 m2 underlayer/pelapis bawah karpet
6.39.1 Bahan
1.050 m2 Underlayer / rubber corrugated @ Rp. 52,500.00
0.350 kg Lem kayu @ Rp. 28,750.00
6.39.2 Tenaga Jumlah (I)
0.120 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Kayu @ Rp. 90,000.00
0.012 OH Kepala Tukang kayu @ Rp. 90,000.00
0.006 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.48 Memasang 1 m2 dinding porselen ukuran (11 x 11) cm
6.48.1 Bahan
86.00 1.050 doos Tegel porselen 11 x 11 cm @ Rp. 595.12
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
1.50 0.500 kg Semen Warna @ Rp. 316.25
6.48.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Batu @ Rp. 70,000.00
0.050 OH Kepala Tukang Batu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.51 Memasang 1 m2 dinding keramik artistik ukuran (10 x 20) cm
6.51.1 Bahan
53.000 buah Tegel keramik 10 x 20 cm motif @ Rp. 1,455.00
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
2.750 kg Semen Warna @ Rp. 316.25
6.51.2 Tenaga Jumlah (I)
0.900 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.52 Memasang 1 m2 dinding keramik ukuran (20 x 25) cm polos
6.53.1 Bahan
20.000 buah Tegel keramik 20 x 25 cm polos @ Rp. 3,375.00
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
2.750 kg Semen Warna @ Rp. 316.25
6.53.2 Tenaga Jumlah (I)
0.900 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.53 Memasang 1 m2 dinding keramik ukuran (20 x 25) cm / warna / motif / tekstur
6.53.1 Bahan
20.000 buah Tegel keramik 20 x 25 cm motif @ Rp. 3,750.00
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
2.750 kg Semen Warna @ Rp. 316.25
6.53.2 Tenaga Jumlah (I)
0.900 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.54a Memasang 1 m2 dinding keramik ukuran (20 x 20) cm / polos
6.54a.1 Bahan
26.500 buah Tegel keramik 20 x 20 cm polos @ Rp. 2,120.00
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
1.940 kg Semen Warna @ Rp. 316.25
6.54a.2 Tenaga Jumlah (I)
0.900 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.54b Memasang 1 m2 dinding keramik ukuran (20 x 20) cm / warna / motif / tekstur
6.54b.1 Bahan
26.500 buah Tegel keramik 20 x 20 cm motif @ Rp. 2,460.00
9.300 kg Semen PC @ Rp. 1,370.00
0.018 m3 Pasir pasang @ Rp. 185,000.00
1.940 kg Semen Warna @ Rp. 316.25
6.54b.2 Tenaga Jumlah (I)
0.900 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.045 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.57 Memasang 1 m2 dinding batu alam / palimanan
6.57.1 Bahan
1.100 m2 Batu alam/ palimanan @ Rp. 109,050.00
11.750 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6.57.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.58 Memasang 1 m2 dinding batu tempel hitam
6.58.1 Bahan
1.100 m2 Batu Candi Polos 15/30 @ Rp. 149,000.00
11.750 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6.58.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.59 Memasang 1 m2 dinding batu lempeng
6.58.1 Bahan
1.100 m2 Batu Lempeng @ Rp. 109,250.00
11.750 kg Semen PC @ Rp. 1,370.00
0.035 m3 Pasir pasang @ Rp. 185,000.00
6.58.2 Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.59 Memasang 1 m2 dinding batu candi
6.58.1 Bahan
1.250 m2 Batu Alur Candi @ Rp. 192,450.00
5.000 kg Semen PC @ Rp. 1,370.00
0.025 m3 Pasir pasang @ Rp. 185,000.00
6.58.2 Tenaga Jumlah (I)
0.240 OH Pekerja @ Rp. 60,000.00
0.120 OH Tukang Batu @ Rp. 70,000.00
0.012 OH Kepala Tukang Batu @ Rp. 90,000.00
0.024 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 Memasang 1 m2 wallpaper, lebar 50 cm
6,60,1 Bahan
2.200 m Wallpaper @ Rp. 2,045.00
0.250 kg Lem kayu @ Rp. 28,750.00
6,60,2 Tenaga Jumlah (I)
0.350 OH Pekerja @ Rp. 60,000.00
0.175 OH Tukang Kayu @ Rp. 90,000.00
0.017 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m’ Step noising
Bahan
1.100 buah Stepnosing @ Rp. 45,000.00
0.003 m3 Pasir pasang @ Rp. 185,000.00
0.025 kg Semen Warna @ Rp. 12,650.00
Tenaga Jumlah (I)
0.045 OH Pekerja @ Rp. 60,000.00
0.045 OH Tukang Batu @ Rp. 70,000.00
0.005 OH Kepala Tukang Batu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Granite ukuran (30 x 30) cm
Bahan
11.870 buah Granite Tile 30 x 30 @ Rp. 34,962.50
10.000 kg Semen Pc @ Rp. 1,370.00
1.500 m3 Semen Warna @ Rp. 316.25
0.045 kg Pasir pasang @ Rp. 4,625.00
Tenaga Jumlah (I)
0.260 OH Pekerja @ Rp. 60,000.00
0.130 OH Tukang Batu @ Rp. 70,000.00
0.013 OH Kepala Tukang Batu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Granite Tile ukuran (60 x 60) cm
Bahan
2.917 buah Granite Tile 60 x 60 @ Rp. 59,762.50
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.300 kg Semen Warna @ Rp. 316.25
Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Granite Tile ukuran (60 x 60) cm Ex. Granito
Bahan
2.917 buah Granite Tile 60 x 60 Ex. Granito @ Rp. 161,191.67
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.300 kg Semen Warna @ Rp. 316.25
Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 lantai Granite Tile ukuran (30 x 60) cm
Bahan
5.833 buah Granite Tile 30 x 60 @ Rp. 32,793.75
9.800 kg Semen PC @ Rp. 1,370.00
0.045 m3 Pasir pasang @ Rp. 185,000.00
1.300 kg Semen Warna @ Rp. 316.25
Tenaga Jumlah (I)
0.700 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Batu @ Rp. 70,000.00
0.035 OH Kepala Tukang Batu @ Rp. 90,000.00
0.035 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 dinding Marmer ukuran (100 x 100) cm
Bahan
1.050 buah Batu Marmer @ Rp. 315,000.00
12.440 kg Semen PC @ Rp. 1,370.00
0.025 m3 Pasir pasang @ Rp. 185,000.00
0.650 kg Semen Warna @ Rp. 316.25
Tenaga Jumlah (I)
1.300 OH Pekerja @ Rp. 60,000.00
0.650 OH Tukang Batu @ Rp. 70,000.00
0.065 OH Kepala Tukang Batu @ Rp. 90,000.00
0.065 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
IX. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT
6.1a Memasang 1 m2 langit-langit asbes semen, tebal 4 mm
6.1a.1 Bahan
1.100 m2 Asbes datar tebal 4 mm (60 x 200) @ Rp. 39,750.00
0.010 kg Paku payung @ Rp. 20,500.00
6.1a.2 Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1b Memasang 1 m2 langit-langit asbes semen, tebal 5 mm
6.1b.1 Bahan
1.100 m2 Asbes datar tebal 5 mm (60 x 200) @ Rp. 51,200.00
0.010 kg Paku payung @ Rp. 20,500.00
6.1b.2 Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1c Memasang 1 m2 langit-langit asbes semen, tebal 6 mm
6.1c.1 Bahan
1.100 m2 Asbes datar tebal 6 mm (40 x 200) @ Rp. 57,850.00
0.010 kg Paku payung @ Rp. 20,500.00
6.1c.2 Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm
6.5.1 Bahan
0.375 lembar Triplek tebal 3 mm (1,22 x 2,44) @ Rp. 62,675.00
0.030 kg Paku triplek @ Rp. 12,075.00
6.5.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 Memasang 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
6.7.1 Bahan
0.364 lembar Gypsum board 9 mm @ Rp. 96,312.50
0.110 kg Paku skrup @ Rp. 20,125.00
6.7.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 langit-langit Calsiboard ukuran (120x240x4) mm, tebal 4 mm
Bahan
0.364 lembar Kalsiboard 4 mm @ Rp. 56,350.00
0.110 kg Paku skrup @ Rp. 20,125.00
Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 langit-langit lambrisering kayu tebal 9 mm
Bahan
0.015 m3 Kayu jati papan 2/20 x 2 m @ Rp. 18,174,450.00
0.010 kg Paku triplek @ Rp. 12,075.00
Tenaga Jumlah (I)
0.800 OH Pekerja @ Rp. 60,000.00
0.800 OH Tukang Kayu @ Rp. 90,000.00
0.080 OH Kepala Tukang kayu @ Rp. 90,000.00
0.040 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 m’ list plafond gypsum profil besar
6.9.1 Bahan
1.050 m' List gypsum besar @ Rp. 27,025.00
0.015 kg Serbuk Gypsum @ Rp. 1,437.50
6.9.2 Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Kayu @ Rp. 90,000.00
0.006 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 m’ list plafond gypsum profil
6.9.1 Bahan
1.050 m' List gypsum @ Rp. 24,250.00
0.015 kg Serbuk Gypsum @ Rp. 1,437.50
6.9.2 Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Kayu @ Rp. 90,000.00
0.006 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 Memasang 1 m’ list langit-langit kayu profil
6.9.1 Bahan
1.050 m' List kayu propil @ Rp. 12,900.00
0.010 kg Paku keling 3/4", 5/8", 7/8" @ Rp. 21,200.00
6.9.2 Tenaga Jumlah (I)
0.050 OH Pekerja @ Rp. 60,000.00
0.050 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 langit-langit eternit
Bahan
1.100 m2 Eternite Sakura @ Rp. 16,100.00
0.010 kg Paku triplek @ Rp. 12,075.00
Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
X. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM
6.1 Memasang 1 kg besi profil siku
6.1.1 Bahan
1.150 kg Besi siku @ Rp. 12,700.00
6.1.2 Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Besi @ Rp. 75,000.00
0.006 OH Kepala Tukang Besi @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 kg baja profil canal
Bahan
1.150 kg Besi canal @ Rp. 16,000.00
Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Besi @ Rp. 75,000.00
0.006 OH Kepala Tukang Besi @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Memasang 1 kg rangka kuda-kuda baja IWF
6.2.1 Bahan
1.150 kg Besi Profil WF @ Rp. 16,900.00
6.2.2 Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Besi @ Rp. 75,000.00
0.006 OH Kepala Tukang Besi @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 Mengerjakan 100 kg pekerjaan perakitan
6.3.1 Bahan
1.000 ltr. Solar @ Rp. 8,500.00
0.100 ltr. Minyak pelumas mesran B. 40 @ Rp. 34,000.00
6.3.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang las @ Rp. 80,000.00
0.001 OH Kepala Tukang Las @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
6.3.3 Alat Jumlah (II)
0.008 Jam Sewa alat / pekerjaan las @ Rp. 40,300.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
6.4.1 Bahan
15.000 kg Besi siku @ Rp. 12,700.00
32.800 kg Besi plate @ Rp. 19,300.00
0.050 kg Kawat Las Listrik @ Rp. 30,475.00
6.4.2 Tenaga Jumlah (I)
1.050 OH Pekerja @ Rp. 60,000.00
1.050 OH Tukang las @ Rp. 80,000.00
0.105 OH Kepala Tukang Las @ Rp. 90,000.00
0.052 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Mengerjakan 10 cm pengelasan dengan las listrik
6,5,1 Bahan
0.400 Kg Kawat Las Listrik @ Rp. 30,475.00
0.300 Liter Solar @ Rp. 8,500.00
0.040 Liter Minyak pelumas mesran B. 40 @ Rp. 34,000.00
6,5,2 Tenaga Jumlah (I)
0.040 OH Pekerja @ Rp. 60,000.00
0.020 OH Tukang las @ Rp. 80,000.00
0.002 OH Kepala Tukang Las @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
6,5,3 Alat Jumlah (II)
0.170 Jam Sewa alat / pekerjaan las @ Rp. 40,300.00
Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m kusen pintu alluminium ex YKK
6.11.1 Bahan
1.100 m Kusen Alumunium 4" (YKK) @ Rp. 138,000.00
2.000 buah Paku skrup 1" @ Rp. 150.00
0.060 tube Sealand @ Rp. 32,200.00
6.11.2 Tenaga Jumlah (I)
0.043 OH Pekerja @ Rp. 60,000.00
0.043 OH Tukang Besi @ Rp. 75,000.00
0.0043 OH Kepala Tukang Besi @ Rp. 80,000.00
0.0021 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 Memasang 1 m kusen pintu alluminium coklat
6.11.1 Bahan
1.100 m Kusen aluminium 4" coklat @ Rp. 123,900.00
2.000 buah Paku skrup 1" @ Rp. 150.00
0.060 tube Sealand @ Rp. 32,200.00
6.11.2 Tenaga Jumlah (I)
0.043 OH Pekerja @ Rp. 60,000.00
0.043 OH Tukang Besi @ Rp. 75,000.00
0.004 OH Kepala Tukang Besi @ Rp. 80,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 Memasang 1 m kusen pintu alluminium perak
6.11.1 Bahan
1.100 m Kusen aluminium 4" perak @ Rp. 113,600.00
2.000 buah Paku skrup 1" @ Rp. 150.00
0.060 tube Sealand @ Rp. 32,200.00
6.11.2 Tenaga Jumlah (I)
0.043 OH Pekerja @ Rp. 60,000.00
0.043 OH Tukang Besi @ Rp. 75,000.00
0.004 OH Kepala Tukang Besi @ Rp. 80,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 Memasang 1 m2 pintu alluminium strip lebar 8 cm
6.12.1 Bahan
4.400 m' Profil Aluminium @ Rp. 104,450.00
14.600 m' Alluminium strip @ Rp. 30,850.00
6.12.2 Tenaga Jumlah (I)
0.085 OH Pekerja @ Rp. 60,000.00
0.085 OH Tukang Besi @ Rp. 75,000.00
0.0085 OH Kepala Tukang Besi @ Rp. 80,000.00
0.0042 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 Memasang 1 m2 Daun pintu kaca rangka alluminium coklat
6.13.1 Bahan
4.400 m' Daun pintu aluminium 8 cm ( kaca 8 mm ) coklat @ Rp. 165,250.00
4.500 m' Profil Kaca @ Rp. 8,050.00
0.270 tube Sealand @ Rp. 32,200.00
6.13.2 Tenaga Jumlah (I)
0.085 OH Pekerja @ Rp. 60,000.00
0.085 OH Tukang Besi @ Rp. 75,000.00
0.009 OH Kepala Tukang Besi @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Memasang 1 m2 Daun pintu kaca rangka alluminium perak
6.13.1 Bahan
4.400 m' Daun pintu aluminium 8 cm ( kaca 8 mm ) perak @ Rp. 154,750.00
4.500 m' Profil Kaca @ Rp. 8,050.00
0.270 tube Sealand @ Rp. 32,200.00
6.13.2 Tenaga Jumlah (I)
0.085 OH Pekerja @ Rp. 60,000.00
0.085 OH Tukang Besi @ Rp. 75,000.00
0.009 OH Kepala Tukang Besi @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 Daun jendela kaca rangka alluminium
Bahan
4.400 m' Profil Aluminium @ Rp. 104,450.00
4.500 m' Profil Kaca @ Rp. 8,050.00
0.270 tube Sealand @ Rp. 32,200.00
Tenaga Jumlah (I)
0.085 OH Pekerja @ Rp. 60,000.00
0.085 OH Tukang Besi @ Rp. 75,000.00
0.009 OH Kepala Tukang Besi @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 Memasang 1 m2 terali besi strip (2 x 3) mm
6.15.1 Bahan
6.177 kg Besi plate strip @ Rp. 19,300.00
27.080 cm Pengelasan @ Rp. 2,400.00
6.15.2 Tenaga Jumlah (I)
1.670 OH Pekerja @ Rp. 60,000.00
1.670 OH Tukang Besi @ Rp. 75,000.00
0.167 OH Kepala Tukang Besi @ Rp. 80,000.00
0.083 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.16 Memasang 1 m2 kawat nyamuk
6.16.1 Bahan
1.100 m2 Kawat nyamuk/kawat kasa biasa @ Rp. 20,125.00
11.110 cm Pengelasan @ Rp. 2,400.00
1.716 kg Besi plate strip @ Rp. 19,300.00
6.16.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Besi @ Rp. 75,000.00
0.010 OH Kepala Tukang Besi @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Memasang 1 m2 jendela nako & teralis
6.17.1 Bahan
1.100 m2 Kaca naco @ Rp. 7,550.00
10.000 buah Paku skrup 1" @ Rp. 150.00
7.000 m Besi strip 5/8 x 3 @ Rp. 10,250.00
6.17.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang las @ Rp. 80,000.00
0.020 OH Kepala tukang las @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga seteah dibulatkan
6.18 Memasang 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm
6.18.1 Bahan
1.050 m' Seng BJLs 28/ 0,9 x 1,8 @ Rp. 83,375.00
0.015 kg Paku payung @ Rp. 20,500.00
0.019 m3 Kayu meranti usuk 5/7 @ Rp. 4,887,500.00
6.18.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang las @ Rp. 80,000.00
0.020 OH Kepala tukang las @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.19 Memasang 1 m’ talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
6.19.1 Bahan
1.050 m' Seng BJLs 20/ 45 cm @ Rp. 16,100.00
0.010 kg Paku payung @ Rp. 20,500.00
0.500 kg Besi strip 5/8 x 3 @ Rp. 10,250.00
6.19.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang las @ Rp. 80,000.00
0.030 OH Kepala tukang las @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
XI. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
6.1a 1 m2 Pasang atap genteng palentong kecil
6.1a.1 Bahan
25.000 buah Genteng Palentong @ Rp. 2,100.00
6.1a.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Kayu @ Rp. 90,000.00
0.0075 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1b 1 m2 Pasang atap genteng flam press / lokal
6.1b.1 Bahan
25.000 buah Genteng flam pres jawa / lokal @ Rp. 1,250.00
6.1b.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Kayu @ Rp. 90,000.00
0.008 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1c 1 m2 Pasang atap genteng karang pilang / lokal
6.1c.1 Bahan
25.000 buah Genteng karang pilang lokal @ Rp. 1,550.00
6.1c.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Kayu @ Rp. 90,000.00
0.008 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1d 1 M2 Pasang atap genteng karang pilang Bima Ambulu
6.1d.1 Bahan
25.000 buah Genteng karang pilang/ Bima Ambulu @ Rp. 3,350.00
6.1d.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Kayu @ Rp. 90,000.00
0.008 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1d 1 M2 Pasang atap genteng beton
6.1d.1 Bahan
11.000 buah genteng beton @ Rp. 5,250.00
0.030 kg Paku reng 2" @ Rp. 11,875.00
6.1d.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1d 1 M2 Pasang atap genteng Zincalume
6.1d.1 Bahan
1.050 m2 Genteng Zincalume 0.3 mm @ Rp. 94,875.00
0.200 kg Paku skrup 0,5" @ Rp. 8,500.00
6.1d.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Kayu @ Rp. 90,000.00
0.080 OH Kepala Tukang kayu @ Rp. 90,000.00
0.006 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1d 1 M2 Pasang atap genteng metal roof
6.1d.1 Bahan
1.020 m2 Genteng Metal Roof 0.3 mm @ Rp. 97,750.00
0.200 doz Paku skrup 0,5" @ Rp. 8,500.00
6.1d.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1d 1 M2 Pasang atap genteng metal roof + insulin
6.1d.1 Bahan
1.020 m2 Genteng Metal Roof + Insulin @ Rp. 92,000.00
0.200 doz Paku skrup 0,5" @ Rp. 8,500.00
6.1d.2 Tenaga Jumlah (I)
0.200 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4a 1 M' Pasang genteng bubung palentong
6.4a.1 Bahan
5.000 buah Genteng Nok Palentong @ Rp. 10,600.00
8.000 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6.4a.2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4b 1 M' Pasang genteng bubung flam press
6.4b.1 Bahan
5.000 buah Genteng Wuwung Flam Pres Lokal @ Rp. 3,450.00
8.000 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6.4b.2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4c 1 M' Pasang genteng bubung karang pilang / lokal
6.4c.1 Bahan
5.000 lembar Genteng Wuwung karangpilang lokal @ Rp. 6,800.00
8.000 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6.4c.2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4d 1 M' Pasang genteng bubung karang pilang Bima Ambulu
6.4d.1 Bahan
5.000 buah Genteng Wuwung Karangpilang/ Bima Ambulu @ Rp. 7,450.00
8.000 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
6.4d.2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 M' Pasang genteng bubung beton
Bahan
3.500 buah Nok Genteng Beton @ Rp. 11,500.00
0.050 kg Paku skrup @ Rp. 20,125.00
10.800 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
1.000 kg Semen Warna @ Rp. 316.25
Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4d 1 M' Pasang genteng bubung samping Zincalume/Metal Roof
6.4d.1 Bahan
1.100 m' Nok Samping Metal Roof @ Rp. 33,350.00
0.050 doz Paku skrup 0,5" @ Rp. 8,500.00
6.4d.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 1 m2 Pasang atap asbes gelombang kecil 4 mm
6.11.1 Bahan
0.350 lembar Asbes gelombang kecil tebal 4 mm (3,05 x 1,05) @ Rp. 78,850.00
0.120 kg Paku pancing @ Rp. 22,350.00
6.11.2 Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11a 1 m2 Pasang atap asbes gelombang 0,92 m x 2,5 m x 5 mm
6.11a.1 Bahan
0.35 0.500 lembar Asbes gelombang besar tebal 5 mm @ Rp. 126,500.00
0.120 kg Paku pancing @ Rp. 22,350.00
6.11a.2 Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.07 0.075 OH Tukang Kayu @ Rp. 90,000.00
0.007 0.008 OH Kepala Tukang kayu @ Rp. 90,000.00
0.007 0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 1 m' Pasang nok stel gelombang 1,05 m
6.23.1 Bahan
2.100 lembar Nok stel gelombang @ Rp. 17,100.00
6.000 buah Paku asbes @ Rp. 500.00
6.23.2 Tenaga Jumlah (I)
0.084 OH Pekerja @ Rp. 60,000.00
0.125 OH Tukang Kayu @ Rp. 90,000.00
0.013 OH Kepala Tukang kayu @ Rp. 90,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.38 1 m2 Pasang atap seng gelombang
6.38.1 Bahan
0.700 lembar Seng Gelombang Pj = 2,40 m @ Rp. 68,425.00
0.020 kg Paku payung @ Rp. 20,500.00
6.38.2 Tenaga Jumlah (I)
0.120 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Kayu @ Rp. 90,000.00
0.006 OH Kepala Tukang kayu @ Rp. 90,000.00
0.006 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.39 1 m' Pasang atap nok seng
6.39.1 Bahan
0.300 lembar Seng BJLs 30/ 60 cm @ Rp. 28,750.00
0.040 kg Paku payung @ Rp. 20,500.00
6.39.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Kayu @ Rp. 90,000.00
0.008 0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.006 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Pasang nok genteng beton
6.39.1 Bahan
3.500 buah Nok genteng beton @ Rp. 11,500.00
0.050 kg Paku payung @ Rp. 20,500.00
10.800 kg Semen PC @ Rp. 1,370.00
0.032 m3 Pasir pasang @ Rp. 185,000.00
1.000 kg Semen Warna @ Rp. 12,650.00
6.39.2 Tenaga Jumlah (I)
0.400 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.020 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Pasang nok genteng metal / zincalume
6.39.1 Bahan
1.100 buah Nok Genteng Metal Roof @ Rp. 31,050.00
0.500 kg Paku payung @ Rp. 20,500.00
6.39.2 Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pasang atap PolyCarbonate 5 mm
Bahan
1.050 m2 Polycarbonat 5 mm @ Rp. 110,000.00
0.120 kg Paku payung @ Rp. 20,500.00
Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.067 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pasang atap PolyCarbonate 10 mm
Bahan
1.050 m2 Polycarbonat 10 mm @ Rp. 160,000.00
0.120 kg Paku payung @ Rp. 20,500.00
Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.067 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pasang atap Solartuff / roof light fiberglass 90 x 180
Bahan
1,05 m2 0.600 lembar Solartuf @ Rp. 486,000.00
0.050 kg Paku payung @ Rp. 20,500.00
Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.067 OH Tukang Kayu @ Rp. 90,000.00
0.007 OH Kepala Tukang kayu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
XII. ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI
6.1 Memasang 1 buah kloset duduk / monoblok
6.1.1 Bahan
1.000 buah Klosed duduk putih porselen komplit @ Rp. 1,380,000.00
6% x harga kloset Perlengkapan @ Rp. 82,800.00
6.1.2 Tenaga Jumlah (I)
3.300 OH Pekerja @ Rp. 60,000.00
1.100 OH Tukang Pipa @ Rp. 70,000.00
0.001 0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.160 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.1 Memasang 1 buah kloset duduk / monoblok Ex TOTO
6.1.1 Bahan
1.000 buah Klosed Duduk @ Rp. 2,518,500.00
6% x harga kloset Perlengkapan @ Rp. 151,110.00
6.1.2 Tenaga Jumlah (I)
3.300 OH Pekerja @ Rp. 60,000.00
1.100 OH Tukang Pipa @ Rp. 70,000.00
0.001 0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.160 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 Memasang 1 buah kloset jongkok porselen
6.2.1 Bahan
1.000 buah Klosed jongkok porselen warna putih @ Rp. 116,550.00
6.000 kg Semen PC @ Rp. 1,370.00
0.010 m3 Pasir pasang @ Rp. 185,000.00
6.2.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
1.500 OH Tukang Pipa @ Rp. 70,000.00
0.150 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.160 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Memasang 1 buah urinoir
6.4.1 Bahan
1.000 buah Urinoir @ Rp. 1,725,000.00
30% x harga urinoir Perlengkapan @ Rp. 517,500.00
6.000 kg Semen PC @ Rp. 1,370.00
0.010 m3 Pasir pasang @ Rp. 185,000.00
6.4.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
1.000 OH Tukang Pipa @ Rp. 70,000.00
0.100 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 Memasang 1 buah urinoir ex TOTO
6.4.1 Bahan
1.000 buah Urinoir Toto @ Rp. 3,680,000.00
30% x harga urinoir Perlengkapan @ Rp. 1,104,000.00
6.000 kg Semen PC @ Rp. 1,370.00
0.010 m3 Pasir pasang @ Rp. 185,000.00
6.4.2 Tenaga Jumlah (I)
1.000 OH Pekerja @ Rp. 60,000.00
1.000 OH Tukang Pipa @ Rp. 70,000.00
0.100 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 Memasang 1 buah wastafel
6.5.1 Bahan
1 bh 1.200 buah Wastafel keramik (Ina) muda @ Rp. 502,000.00
12% x harga WastafelPerlengkapan @ Rp. 150,600.00
6.000 kg Semen PC @ Rp. 1,370.00
0.010 m3 Pasir pasang @ Rp. 185,000.00
6.5.2 Tenaga Jumlah (I)
1.200 OH Pekerja @ Rp. 60,000.00
1.450 OH Tukang Pipa @ Rp. 70,000.00
0.150 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.060 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 buah bak air fiberglass vol 1 m3
6.8.1 Bahan
1.000 bh Bak air (tandon) Fibre kapasitas 550 m3 @ Rp. 770,500.00
12% x harga tandon Perlengkapan @ Rp. 92,460.00

6.8.2 Tenaga Jumlah (I)


0.300 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Batu @ Rp. 70,000.00
0.045 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 Memasang 1 buah bak mandi batu bata volume 0,30 m3
6.8.1 Bahan
150.000 bh Batu bata merah @ Rp. 750.00
120.000 kg Semen PC @ Rp. 1,370.00
0.300 m3 Pasir pasang @ Rp. 185,000.00
360.000 buah Tegel porselen 11 x 11 cm @ Rp. 542.22
6.000 kg Semen Warna @ Rp. 316.25
6.8.2 Tenaga Jumlah (I)
6.000 OH Pekerja @ Rp. 60,000.00
3.000 OH Tukang Batu @ Rp. 70,000.00
0.300 OH Kepala Tukang Batu @ Rp. 90,000.00
0.30 0.030 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 buah bak cuci piring stainlessteel
6.8.1 Bahan
1.000 unit Bak cuci piring logam 100 @ Rp. 287,500.00
1.000 bh Afour @ Rp. 38,600.00
6.8.2 Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang Batu @ Rp. 70,000.00
0.030 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14a Memasang 1 m' pipa beton, dia. 15 cm
6.14a.1 Bahan
1.100 buah Buis beton diameter 15 cm @ Rp. 23,400.00
0.027 m3 Batu bata merah @ Rp. 372,023.81
3.920 kg Semen PC @ Rp. 1,370.00
0.056 m3 Pasir pasang @ Rp. 185,000.00
0.024 m3 Pasir urug @ Rp. 3,750.00
6.14a.2 Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Batu @ Rp. 70,000.00
0.007 OH Kepala Tukang Batu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14b Memasang 1 m' pipa beton, dia. 20 cm
6.14b.1 Bahan
1.100 buah Buis beton diameter 20 cm @ Rp. 33,900.00
0.027 m3 Batu bata merah @ Rp. 372,023.81
3.920 kg Semen PC @ Rp. 1,370.00
0.056 m3 Pasir pasang @ Rp. 185,000.00
0.024 m3 Pasir urug @ Rp. 3,750.00
6.14b.2 Tenaga Jumlah (I)
0.140 OH Pekerja @ Rp. 60,000.00
0.070 OH Tukang Batu @ Rp. 70,000.00
0.007 OH Kepala Tukang Batu @ Rp. 90,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15a Memasang 1 m' pipa beton, dia. 30 cm
6.15a.1 Bahan
1.100 buah Buis beton diameter 30 cm @ Rp. 42,500.00
0.550 m3 Batu bata merah @ Rp. 372,023.81
10.300 kg Semen PC @ Rp. 1,370.00
0.061 m3 Pasir pasang @ Rp. 185,000.00
0.069 m3 Pasir urug @ Rp. 3,750.00
6.15a.2 Tenaga Jumlah (I)
0.380 OH Pekerja @ Rp. 60,000.00
0.190 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.019 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15b Memasang 1 m' pipa beton, dia. 40 cm
6.15b.1 Bahan
1.100 buah Buis beton diameter 40 cm @ Rp. 46,600.00
0.550 m3 Batu bata merah @ Rp. 372,023.81
10.300 kg Semen PC @ Rp. 1,370.00
0.061 m3 Pasir pasang @ Rp. 185,000.00
0.069 m3 Pasir urug @ Rp. 3,750.00
6.15b.2 Tenaga Jumlah (I)
0.380 OH Pekerja @ Rp. 60,000.00
0.190 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.019 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15c Memasang 1 m' pipa beton, dia. 50 cm
6.15c.1 Bahan
1.100 buah Buis beton diameter 50 cm @ Rp. 57,300.00
0.550 m3 Batu bata merah @ Rp. 372,023.81
10.300 kg Semen PC @ Rp. 1,370.00
0.061 m3 Pasir pasang @ Rp. 185,000.00
0.069 m3 Pasir urug @ Rp. 3,750.00
6.15c.2 Tenaga Jumlah (I)
0.380 OH Pekerja @ Rp. 60,000.00
0.190 OH Tukang Batu @ Rp. 70,000.00
0.019 OH Kepala Tukang Batu @ Rp. 90,000.00
0.019 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.16 Memasang 1 buah bak kontrol pasangan batu bata uk. (30x30) cm, tinggi 35 cm
6.16.1 Bahan
40.000 bh Batu bata merah @ Rp. 750.00
44.000 kg Semen PC @ Rp. 1,370.00
0.070 m3 Pasir pasang @ Rp. 185,000.00
0.070 m3 Batu pecah 3 - 5 @ Rp. 260,000.00
1.600 kg Besi beton polos @ Rp. 10,000.00
0.060 m3 Pasir beton @ Rp. 5,000.00
6.16.2 Tenaga Jumlah (I)
2.160 OH Pekerja @ Rp. 60,000.00
0.720 OH Tukang Batu @ Rp. 70,000.00
0.072 OH Kepala Tukang Batu @ Rp. 90,000.00
0.011 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17 Memasang 1 buah bak kontrol pasangan batu bata uk. (45 x 45) cm, tinggi 50 cm
6.17.1 Bahan
70.000 bh Batu bata merah @ Rp. 750.00
77.000 kg Semen PC @ Rp. 1,370.00
0.130 m3 Pasir pasang @ Rp. 185,000.00
0.020 m3 Batu pecah 3 - 5 @ Rp. 260,000.00
2.600 kg Besi beton polos @ Rp. 10,000.00
0.090 m3 Pasir beton @ Rp. 5,000.00
6.17.2 Tenaga Jumlah (I)
3.200 OH Pekerja @ Rp. 60,000.00
1.150 OH Tukang Batu @ Rp. 70,000.00
0.011 OH Kepala Tukang Batu @ Rp. 90,000.00
0.016 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.18 Memasang 1 buah bak kontrol pasangan batu bata uk. (60 x 60) cm, tinggi 65 cm
6.18.1 Bahan
123.000 bh Batu bata merah @ Rp. 750.00
114.000 kg Semen PC @ Rp. 1,370.00
0.184 m3 Pasir pasang @ Rp. 185,000.00
0.033 m3 Batu pecah 3 - 5 @ Rp. 260,000.00
4.850 kg Besi beton polos @ Rp. 10,000.00
0.120 m3 Pasir beton @ Rp. 5,000.00
6.18.2 Tenaga Jumlah (I)
3.200 OH Pekerja @ Rp. 60,000.00
1.150 OH Tukang Batu @ Rp. 70,000.00
0.011 OH Kepala Tukang Batu @ Rp. 90,000.00
0.016 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.19 Memasang 1 m' pipa galvanis dia. 1/2"
6.19.1 Bahan
1.200 m' Pipa Air Gl Ø 1/2" @ Rp. 21,875.00
35% x harga pipa Perlengkapan @ Rp. 7,656.25
6.19.2 Tenaga Jumlah (I)
0.054 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Pipa @ Rp. 70,000.00
0.009 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.027 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.20 Memasang 1 m' pipa galvanis dia. 3/4"
6.20.1 Bahan
1.200 m' Pipa Air Gl Ø 3/4" @ Rp. 26,225.00
35% x harga pipa Perlengkapan @ Rp. 9,178.75
6.20.2 Tenaga Jumlah (I)
0.054 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Pipa @ Rp. 70,000.00
0.009 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.027 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.21 Memasang 1 m' pipa galvanis dia. 1"
6.21.1 Bahan
1.200 m' Pipa Air Gl Ø 1" @ Rp. 39,375.00
35% x harga pipa Perlengkapan @ Rp. 13,781.25
6.21.2 Tenaga Jumlah (I)
0.054 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Pipa @ Rp. 70,000.00
0.009 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.027 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.22 Memasang 1 m' pipa galvanis dia. 2"
6.22.1 Bahan
1.200 m' Pipa Air Gl Ø 2" @ Rp. 85,991.67
35% x harga pipa Perlengkapan @ Rp. 30,097.08
6.22.2 Tenaga Jumlah (I)
0.108 OH Pekerja @ Rp. 60,000.00
0.180 OH Tukang Pipa @ Rp. 70,000.00
0.018 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m' pipa galvanis dia. 1,5"
6.22.1 Bahan
1.200 m' Pipa Air Gl Ø 1 1/2" @ Rp. 58,308.33
35% x harga pipa Perlengkapan @ Rp. 20,407.92
6.22.2 Tenaga Jumlah (I)
0.108 OH Pekerja @ Rp. 60,000.00
0.180 OH Tukang Pipa @ Rp. 70,000.00
0.018 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.23 Memasang 1 m' pipa galvanis dia. 3"
6.23.1 Bahan
1.200 m' Pipa Air Gl Ø 3" @ Rp. 141,043.33
35% x harga pipa Perlengkapan @ Rp. 49,365.17
6.23.2 Tenaga Jumlah (I)
0.135 OH Pekerja @ Rp. 60,000.00
0.225 OH Tukang Pipa @ Rp. 70,000.00
0.023 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.24 Memasang 1 m' pipa galvanis dia. 4"
6.24.1 Bahan
1.200 m' Pipa Air Gl Ø 4" @ Rp. 206,438.33
35% x harga pipa Perlengkapan @ Rp. 72,253.42
6.24.2 Tenaga Jumlah (I)
0.135 OH Pekerja @ Rp. 60,000.00
0.225 OH Tukang Pipa @ Rp. 70,000.00
0.023 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.007 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.25 Memasang 1 m' pipa PVC tipe AW dia. 1/2"
6.25.1 Bahan
1.200 m' Pipa PVC 1/2" AW @ Rp. 7,187.50
35% x harga pipa Perlengkapan @ Rp. 2,515.63
6.25.2 Tenaga Jumlah (I)
0.036 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Pipa @ Rp. 70,000.00
0.006 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.26 Memasang 1 m' pipa PVC tipe AW dia. 3/4"
6.26.1 Bahan
1.200 m' Pipa PVC 3/4" AW @ Rp. 9,100.00
35% x harga pipa Perlengkapan @ Rp. 3,185.00
6.26.2 Tenaga Jumlah (I)
0.036 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Pipa @ Rp. 70,000.00
0.006 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.27 Memasang 1 m' pipa PVC tipe AW dia. 1"
6.27.1 Bahan
1.200 m' Pipa PVC 1" AW @ Rp. 11,308.33
35% x harga pipa Perlengkapan @ Rp. 3,957.92
6.27.2 Tenaga Jumlah (I)
0.036 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Pipa @ Rp. 70,000.00
0.006 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.002 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m' pipa PVC tipe AW dia. 1,5"
6.27.1 Bahan
1.200 m' Pipa PVC 1 1/2" AW @ Rp. 20,968.33
35% x harga pipa Perlengkapan @ Rp. 7,338.92
6.27.2 Tenaga Jumlah (I)
0.054 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Pipa @ Rp. 70,000.00
0.009 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.28 Memasang 1 m' pipa PVC tipe AW dia. 2"
6.28.1 Bahan
1.200 m' Pipa PVC 2" AW @ Rp. 31,050.00
35% x harga pipa Perlengkapan @ Rp. 10,867.50
6.28.2 Tenaga Jumlah (I)
0.054 OH Pekerja @ Rp. 60,000.00
0.090 OH Tukang Pipa @ Rp. 70,000.00
0.009 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m' pipa PVC tipe AW dia. 3"
Bahan
1.200 m' Pipa PVC 3" AW @ Rp. 57,250.83
35% x harga pipa Perlengkapan @ Rp. 20,037.79
Tenaga Jumlah (I)
0.081 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Pipa @ Rp. 70,000.00
0.0135 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.29 Memasang 1 m' pipa PVC tipe AW dia. 4"
6.29.1 Bahan
1.200 m' Pipa PVC 4" AW @ Rp. 83,758.33
35% x harga pipa Perlengkapan @ Rp. 29,315.42
6.29.2 Tenaga Jumlah (I)
0.081 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Pipa @ Rp. 70,000.00
0.0135 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.30 Memasang 1 m' pipa PVC tipe AW dia. 6"
6.30.1 Bahan
1.200 m' Pipa PVC 6" AW @ Rp. 169,050.00
35% x harga pipa Perlengkapan @ Rp. 59,167.50
6.30.2 Tenaga Jumlah (I)
0.081 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Pipa @ Rp. 70,000.00
0.014 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.31 Memasang 1 m' pipa PVC tipe AW dia. 8"
6.31.1 Bahan
1.200 m' Pipa PVC 8" AW @ Rp. 257,000.00
35% x harga pipa Perlengkapan @ Rp. 89,950.00
6.31.2 Tenaga Jumlah (I)
0.081 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Pipa @ Rp. 70,000.00
0.014 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.32 Memasang 1 m' pipa PVC tipe AW dia. 10"
6.32.1 Bahan
1.200 m' Pipa PVC 10" AW @ Rp. 356,500.00
35% x harga pipa Perlengkapan @ Rp. 124,775.00
6.32.2 Tenaga Jumlah (I)
0.081 OH Pekerja @ Rp. 60,000.00
0.135 OH Tukang Pipa @ Rp. 70,000.00
0.014 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.004 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Memasang 1 buah kran biasa diameter 1/2"
6.35.1 Bahan
1.000 buah Kran biasa @ Rp. 21,500.00
0.025 buah Seal Tape @ Rp. 2,700.00
6.35.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 0.400 OH Tukang Pipa @ Rp. 70,000.00
0.010 0.040 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Memasang 1 buah kran biasa diameter 3/4"
6.35.1 Bahan
1.000 buah Kran air 3/4" @ Rp. 22,050.00
0.025 buah Seal Tape @ Rp. 2,700.00
6.35.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 0.400 OH Tukang Pipa @ Rp. 70,000.00
0.010 0.040 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Memasang 1 buah kran
6.35.1 Bahan
1.000 buah Kran Sedang @ Rp. 52,350.00
0.025 buah Seal Tape @ Rp. 2,700.00
6.35.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.400 OH Tukang Pipa @ Rp. 70,000.00
0.040 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Memasang 1 buah kran wastafel
6.35.1 Bahan
1.000 buah Kran Wastafel @ Rp. 56,250.00
0.025 buah Seal Tape @ Rp. 2,700.00
6.35.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Pipa @ Rp. 70,000.00
0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.35 Memasang 1 buah kran leher angsa
6.35.1 Bahan
1.000 buah Kran Leher Angsa @ Rp. 92,000.00
0.025 buah Paku asbes @ Rp. 500.00
6.35.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Pipa @ Rp. 70,000.00
0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.36 Memasang 1 buah floor drain
6.36.1 Bahan
1.000 buah Floor drain @ Rp. 175,375.00
6.36.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Pipa @ Rp. 70,000.00
0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 buah Shower Kloset
Bahan
1.000 buah Shower kloset biasa @ Rp. 85,000.00
0.025 buah Seal Tape @ Rp. 2,700.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Pipa @ Rp. 70,000.00
0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 buah Shower Kamar Mandi
Bahan
1.000 buah Hand Shower @ Rp. 143,750.00
0.025 buah Seal Tape @ Rp. 2,700.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Pipa @ Rp. 70,000.00
0.010 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 buah Bak Cuci
Bahan
1.000 buah Bak cuci piring logam 100 @ Rp. 287,500.00
1.000 buah Afour @ Rp. 38,600.00
Tenaga Jumlah (I)
0.030 OH Pekerja @ Rp. 60,000.00
0.300 OH Tukang Pipa @ Rp. 70,000.00
0.030 OH Kepala Tukang Pipa @ Rp. 80,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
XIII. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA
6.2 1 buah Pasang kunci tanam biasa
6.2.1 Bahan
1.000 buah Kunci tanam (808) @ Rp. 51,000.00
6.2.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang kunci silinder
6.2.1 Bahan
1.000 buah Kunci silinder @ Rp. 57,500.00
6.2.2 Tenaga Jumlah (I)
0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang kunci tanam Alumunium
Bahan
1.000 buah Kunci pintu Aluminium @ Rp. 66,125.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.3 1 buah Pasang kunci kamar mandi
6.3.1 Bahan
1.000 buah Kunci tanam kamar mandi @ Rp. 49,450.00
6.3.2 Tenaga Jumlah (I)
0.05 0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.4 1 buah Pasang kunci pintu
6.4.1 Bahan
1.000 buah Kunci 2 x putar @ Rp. 186,875.00
6.4.2 Tenaga Jumlah (I)
0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 set Pasang floor hinge
Bahan
1.000 set Floor Hinge @ Rp. 1,700,000.00
Tenaga Jumlah (I)
0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.000 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 set Pasang Shower Hinge
Bahan
1.000 set Shower Hinge @ Rp. 700,000.00
Tenaga Jumlah (I)
0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.000 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 bh Pasang Patch Fitting
Bahan
1.000 bh Patch Fitting @ Rp. 550,000.00
Tenaga Jumlah (I)
0.005 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.005 OH Kepala Tukang kayu @ Rp. 90,000.00
0.000 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 buah Pasang casement handle
6.5.1 Bahan
1.000 buah Casement Handel @ Rp. 33,500.00
6.5.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 buah Pasang engsel pintu
6.5.1 Bahan
1.000 buah Engsel pintu @ Rp. 20,000.00
6.5.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang engsel angin
6.5.1 Bahan
1.000 buah Engsel angin @ Rp. 15,525.00
6.5.2 Tenaga Jumlah (I)
0.100 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.5 1 buah Pasang engsel pintu alumunium
6.5.1 Bahan
1.000 buah Engsel pintu Aluminium biasa @ Rp. 51,650.00
6.5.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.6 1 buah Pasang engsel jendela kupu-kupu
6.6.1 Bahan
1.000 buah Engsel jendela @ Rp. 15,850.00
6.6.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang engsel jendela alumunium
Bahan
1.000 buah Engsel jendela Aluminium stenlees @ Rp. 23,575.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang grendel tanam
Bahan
1.000 buah Grendel tanam @ Rp. 12,937.50
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang grendel jendela / spring knip
Bahan
1.000 buah Grendel Jendela @ Rp. 18,975.00
Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang grendel alumunium
Bahan
1.000 buah Grendel jendela Aluminium biasa @ Rp. 24,725.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 buah Pasang Espanyolet
Bahan
1.000 buah Espanyolet @ Rp. 26,650.00
Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 1 buah Pasang kait/hak angin
6.9.1 Bahan
1.000 buah Hak angin 44 mm (lurus) @ Rp. 10,000.00
6.9.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.10 1 buah Pasang door closer
6.10.1 Bahan
1.000 set Door Closer @ Rp. 172,500.00
6.10.2 Tenaga Jumlah (I)
0.050 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 1 buah Pasang kunci selot
6.11.1 Bahan
1.000 buah Kunci selot @ Rp. 66,125.00
6.11.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang Kayu @ Rp. 90,000.00
0.020 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.12 1 buah Pasang pegangan pintu / door holder
6.12.1 Bahan
1.000 buah Door Holder @ Rp. 46,000.00
6.12.2 Tenaga Jumlah (I)
0.050 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang kayu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 1 buah Pasang door stop
6.13.1 Bahan
1.000 buah Door Stop @ Rp. 51,750.00
6.13.2 Tenaga Jumlah (I)
0.010 OH Pekerja @ Rp. 60,000.00
0.100 OH Tukang Kayu @ Rp. 90,000.00
0.010 OH Kepala Tukang kayu @ Rp. 90,000.00
0.005 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17a 1 m2 pasang kaca, tebal 5 mm
6.17a.1 Bahan
1.100 m2 Kaca polos tebal 5 mm @ Rp. 86,050.00
6.17a.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17a 1 m2 pasang kaca, tebal 5 mm + Sealant
6.17a.1 Bahan
1.100 m2 Kaca polos tebal 5 mm @ Rp. 86,050.00
0.050 tube Sealand @ Rp. 32,200.00
6.17a.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17b 1 m2 pasang kaca rayban, tebal 5 mm
6.17b.1 Bahan
1.100 m2 Kaca rayban tebal 5 mm @ Rp. 108,175.00
6.17b.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17c 1 m2 pasang kaca cermin, tebal 5 mm
6.17b.1 Bahan
1.100 m2 Kaca Cermin tb. 5 mm @ Rp. 105,000.00
6.17b.2 Tenaga Jumlah (I)
0.015 OH Pekerja @ Rp. 60,000.00
0.150 OH Tukang Kayu @ Rp. 90,000.00
0.015 OH Kepala Tukang kayu @ Rp. 90,000.00
0.0008 0.0080 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.17e 1 m2 pasang kaca tempered, tebal 12 mm
6.17b.1 Bahan
1.100 m2 Kaca Flat Tempered 12mm @ Rp. 1,425,000.00
6.17b.2 Tenaga Jumlah (I)
0.025 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Kayu @ Rp. 90,000.00
0.025 OH Kepala Tukang kayu @ Rp. 90,000.00
0.001 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
XIV. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN
6.7 1 m2 Pengikisan/Pengerokan Permukaan Cat lama
6.7.1 Bahan
0.050 kg Soda api @ Rp. 26,750.00
6.7.2 Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.7 1 m2 Pengecatan bidang kayu lama
6.7.1 Bahan
0.150 kg Plamur kayu @ Rp. 28,750.00
0.170 kg Cat dasar @ Rp. 60,260.00
0.170 kg Cat kayu, besi merk Emco STD @ Rp. 60,260.00
6.7.2 Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.075 OH Tukang Cat @ Rp. 75,000.00
0.008 OH Kepala Tukang Cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.8 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
6.8.1 Bahan
0.200 kg Cat menie (besi/kayu) sejenis cap Pedang @ Rp. 38,180.00
0.150 kg Plamur kayu @ Rp. 28,750.00
0.170 kg Cat dasar @ Rp. 60,260.00
0.260 kg Cat Kayu @ Rp. 60,260.00
0.010 bh Kuas Uk 4" @ Rp. 19,300.00
0.030 kg Thinner @ Rp. 21,000.00
0.200 lbr Amplas @ Rp. 5,350.00
6.8.2 Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.009 OH Tukang Cat @ Rp. 75,000.00
0.006 OH Kepala Tukang Cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.9 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9.1 Bahan
0.200 kg Cat menie (besi/kayu) sejenis cap Pedang @ Rp. 38,180.00
0.150 kg Plamir @ Rp. 28,750.00
0.170 kg Cat dasar @ Rp. 60,260.00
0.350 kg Cat penutup 2 kali @ Rp. 60,260.00
0.010 bh Kuas Uk 4" @ Rp. 19,300.00
0.030 kg Thinner @ Rp. 21,000.00
0.200 lbr Amplas @ Rp. 5,350.00
6.9.2 Tenaga Jumlah (I)
0.070 OH Pekerja @ Rp. 60,000.00
0.105 OH Tukang Cat @ Rp. 75,000.00
0.004 OH Kepala Tukang Cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.11 1 m2 Pelaburan bidang kayu dengan politur
6.11.1 Bahan
0.150 ltr. Politur @ Rp. 77,050.00
0.372 ltr. Politur @ Rp. 77,050.00
2.000 lbr Amplas @ Rp. 5,350.00
6.11.2 Tenaga Jumlah (I)
0.040 OH Pekerja @ Rp. 60,000.00
0.060 OH Tukang Cat @ Rp. 75,000.00
0.016 OH Kepala Tukang Cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.13 1 m2 Pelaburan bidang kayu dengan vernis
6.13.1 Bahan
0.150 ltr. Vernis @ Rp. 66,125.00
0.050 kg Dempul @ Rp. 28,750.00
0.100 lembar Amplas @ Rp. 5,350.00
6.13.2 Tenaga Jumlah (I)
0.160 OH Pekerja @ Rp. 60,000.00
0.160 OH Tukang cat @ Rp. 75,000.00
0.016 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat tembok Vinilek, Aviapaint (sejenis) @ Rp. 50,600.00
0.260 kg Cat penutup 2x @ Rp. 50,600.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.0063 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok Interior (mowilex) @ Rp. 42,000.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.14 1 m2 Pengecatan tembok baru/exterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14.1 Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 kg Cat dasar @ Rp. 50,600.00
0.260 kg Cat tembok Eksterior (Pentalux) @ Rp. 69,900.00
6.14.2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
6.15.1 Bahan
0.120 kg Cat dasar @ Rp. 50,600.00
0.180 kg Cat penutup 2x @ Rp. 50,600.00
6.15.2 Tenaga Jumlah (I)
0.028 OH Pekerja @ Rp. 60,000.00
0.042 OH Tukang cat @ Rp. 75,000.00
0.0042 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 1 m2 Pengecatan tembok lama/interior (1 lapis cat dasar, 2 lapis cat penutup)
6.15.1 Bahan
0.120 kg Cat dasar @ Rp. 50,600.00
0.180 kg Cat tembok Interior (mowilex) @ Rp. 42,000.00
6.15.2 Tenaga Jumlah (I)
0.028 OH Pekerja @ Rp. 60,000.00
0.042 OH Tukang cat @ Rp. 75,000.00
0.004 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.15 1 m2 Pengecatan tembok lama/exterior (1 lapis cat dasar, 2 lapis cat penutup)
6.15.1 Bahan
0.120 kg Cat dasar @ Rp. 50,600.00
0.180 kg Cat tembok Eksterior (Pentalux) @ Rp. 69,900.00
6.15.2 Tenaga Jumlah (I)
0.028 OH Pekerja @ Rp. 60,000.00
0.042 OH Tukang cat @ Rp. 75,000.00
0.004 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 1 m2 Pengecatan permukaan baja dengan meni besi
6,20,1 Bahan
0.100 kg Cat menie (besi/kayu) sejenis cap Pedang @ Rp. 38,180.00
0.010 bh Kuas Uk 4" @ Rp. 19,300.00
6,20,2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang cat @ Rp. 75,000.00
0.020 OH Kepala tukang cat @ Rp. 85,000.00
0.0025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
6.2 1 m2 Pengecatan permukaan baja dengan bronze
6,20,1 Bahan
0.100 kg bronze @ Rp. 53,750.00
0.010 bh Kuas Uk 4" @ Rp. 19,300.00
6,20,2 Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.200 OH Tukang cat @ Rp. 75,000.00
0.020 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pengecatan tembok weathercoat - putih
Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 ltr Cat Tembok Weather Coat - putih @ Rp. 70,500.00
0.200 ltr Cat penutup 2x @ Rp. 70,500.00
Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pengecatan tembok weathercoat - warna
Bahan
0.100 kg Plamur tembok @ Rp. 28,175.00
0.100 ltr Cat Tembok Weather Coat - putih @ Rp. 100,000.00
0.200 ltr Cat penutup 2x @ Rp. 100,000.00
Tenaga Jumlah (I)
0.020 OH Pekerja @ Rp. 60,000.00
0.063 OH Tukang cat @ Rp. 75,000.00
0.006 OH Kepala tukang cat @ Rp. 85,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
XV.ANALISA BIAYA KONSTRUKSI PEKERJAAN PAVING
1 m2 pasang paving block K300, t=6 cm
Bahan
44.00 1.010 m2 Paving 21.0 x 10.5 x 6.0 mutu K 300 @ Rp. 63,000.00
0.120 0.050 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.500 0.250 OH Pekerja @ Rp. 60,000.00
0.250 0.500 OH Tukang Batu @ Rp. 70,000.00
0.025 0.050 OH Kepala Tukang Batu @ Rp. 90,000.00
0.025 0.0013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 pasang paving block K200, t=6 cm Warna
Bahan
44.00 1.010 m2 Paving 21.0 x 10.5 x 6.0 mutu K 200 warna @ Rp. 76,700.00
0.12 0.050 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.50 0.250 OH Pekerja @ Rp. 60,000.00
0.25 0.500 OH Tukang Batu @ Rp. 70,000.00
0.03 0.050 OH Kepala Tukang Batu @ Rp. 90,000.00
0.03 0.0013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 pasang paving segi enam K300, t=6 cm
Bahan
25.000 bj Paving stone segi enam 6 cm halus @ Rp. 1,864.00
0.120 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 pasang paving motif/grass K300, t=6 cm
Bahan
25.000 bj Paving Stoen motif K300 @ Rp. 2,658.00
0.120 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 pasang grass blok K300, t=6 cm
Bahan
5.250 bj Grass Block @ Rp. 29,560.00
0.120 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m2 Pasang Uskup tbl 6cm
Bahan
25.000 buah Uskup Tbl 6.0 mutu K 300 @ Rp. 4,900.00
0.120 m3 Pasir urug @ Rp. 150,000.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Batu @ Rp. 70,000.00
0.025 OH Kepala Tukang Batu @ Rp. 90,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Pasang Kanstin (10x20x40 cm)
Bahan
2.400 buah Kanstin 40 x 20 x 10 K 300 @ Rp. 21,800.00
0.013 m3 Pasir pasang @ Rp. 185,000.00
2.000 kg Semen PC @ Rp. 1,370.00
Tenaga Jumlah (I)
0.060 OH Pekerja @ Rp. 60,000.00
0.020 OH Tukang Batu @ Rp. 70,000.00
0.002 OH Kepala Tukang Batu @ Rp. 90,000.00
0.003 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
XVI.ANALISA BIAYA KONSTRUKSI PEKERJAAN BRONJONG
1 m3 Pembangunan penempatan bronjong termasuk penyediaan batu dan kawat brojong untuk
anyaman
Kawat Anyaman 3 mm (untuk 3 m3 bronjong)
25.000 kg Kawat ikat untuk bronjong @ Rp. 20,050.00
Penganyam Jumlah (I)
2.000 org/hr Penganyam bronjong @ Rp. 75,000.00
1.600 org/hr Pekerja @ Rp. 60,000.00
0.080 org/hr Mandor Lapangan @ Rp. 90,000.00
Pengisian dan Penempatan Jumlah (II)
3.000 m3 Batu Belah 15/20 @ Rp. 120,100.00
4.500 org/hr Pekerja @ Rp. 60,000.00
0.075 org/hr Mandor Lapangan @ Rp. 90,000.00
Jumlah (III)
Harga satuan pekerjaan per 3 m3
Harga satuan pekerjaan per 1 m3
Harga setelah dibulatkan
1 m3 Pembangunan penempatan bronjong termasuk penyediaan batu dan kawat brojong untuk
anyaman
Kawat Anyaman Galvanis (untuk 3 m3 bronjong)
25.000 kg Kawat bronjong galvanis @ Rp. 24,850.00
Penganyam Jumlah (I)
2.200 org/hr Penganyam bronjong @ Rp. 75,000.00
1.800 org/hr Pekerja @ Rp. 60,000.00
0.080 org/hr Mandor Lapangan @ Rp. 90,000.00
Pengisian dan Penempatan Jumlah (II)
3.000 m3 Batu Belah 15/20 @ Rp. 120,100.00
4.500 org/hr Pekerja @ Rp. 60,000.00
0.075 org/hr Mandor Lapangan @ Rp. 90,000.00
Jumlah (III)
Harga satuan pekerjaan per 3 m3
Harga satuan pekerjaan per 1 m3
Harga setelah dibulatkan
P.05 1 m3 Pasangan batu bronjong kawat 6 ukuran 100 x 30 x 50 & besi beton 10
Bahan
1.800 m3 Batu Belah 15/20 @ Rp. 120,100.00
4.320 kg Kawat ikat untuk bronjong @ Rp. 20,050.00
24.500 kg Besi beton polos @ Rp. 10,000.00
Tenaga Jumlah (I)
0.750 OH Pekerja @ Rp. 60,000.00
0.300 OH Penganyam bronjong @ Rp. 75,000.00
0.060 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (I)
Harga satuan pekerjaan
Harga setelah dibulatkan
P.05 1 m3 Pasangan batu bronjong kawat 8 ukuran 100 x 30 x 50 & besi beton 12
Bahan
1.800 m3 Batu Belah 15/20 @ Rp. 120,100.00
7.680 kg Kawat ikat untuk bronjong @ Rp. 20,050.00
35.300 kg Besi beton polos @ Rp. 10,000.00
Tenaga Jumlah (I)
0.850 OH Pekerja @ Rp. 60,000.00
0.300 OH Penganyam bronjong @ Rp. 75,000.00
0.060 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (I)
Harga satuan pekerjaan
Harga setelah dibulatkan
P.05 1 m3 Pasangan batu bronjong kawat 10 ukuran 100 x 30 x 50 & besi beton 12
Bahan
1.800 m3 Batu Belah 15/20 @ Rp. 120,100.00
12.000 kg Kawat ikat untuk bronjong @ Rp. 20,050.00
35.300 kg Besi beton polos @ Rp. 10,000.00
Tenaga Jumlah (I)
0.950 OH Pekerja @ Rp. 60,000.00
0.300 OH Penganyam bronjong @ Rp. 75,000.00
0.060 OH Kepala Tukang Batu @ Rp. 90,000.00
0.015 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (I)
Harga satuan pekerjaan
Harga setelah dibulatkan
XVII.ANALISA BIAYA KONSTRUKSI PEKERJAAN TIANG PANCANG
1 m' Tiang pancang Δ 28 x28x28 cm , L = 6,00 m
Bahan
1.000 m' Tiang pancang beton Δ 28x28x28 cm @ Rp. 195,000.00
Type A2, L : 6 M
Alat Jumlah (I)
1.000 m' Biaya pemancangan tiang pancang Ø 300 mm (Dr @ Rp. 83,450.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Tiang pancang dia. 0,30 m , L = 6,00 m
Bahan
1.000 m' Tiang pancang beton diamtr. 300 mm
Type A2, L : 6 m @ Rp. 309,750.00
Alat Jumlah (I)
1.000 m' Biaya pemancangan tiang pancang Ø 300 mm (Dr @ Rp. 83,450.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Tiang pancang 20 / 20 Cm , L = 6,00 m
Bahan
1.000 m' Tiang Pancang beton 20 x 20 cm K.500 @ Rp. 141,000.00
Alat Jumlah (I)
1.000 m' Biaya pemancangan tiang pancang 20 x 20cm (Inje@ Rp. 64,150.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
1 m' Tiang pancang
BAHAN
1.010 m Tiang Pancang 30 @ Rp. 195,000.00
0.150 kg Kawat las listrik @ Rp. 30,475.00
Tenaga Jumlah (I)
0.025 OH Pekerja @ Rp. 60,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
0.025 OH Operator terampil @ Rp. 100,000.00
0.025 OH Tukang las @ Rp. 80,000.00
PERALATAN Jumlah (II)
0.025 Hari -
Sewa Truck Crane @ Rp. 291,450.00
sewa
0.025 Hari -
Alat pancang Hammer 2 ton @ Rp. 2,500,000.00
sewa
0.025 Hari -
Las listrik diesel @ Rp. 40,300.00
sewa
(termasuk solar)
JUMLAH HARGA PERALATAN Jumlah (III)
Harga satuan pekerjaan
Harga setelah dibulatkan
XVIII.ANALISA BIAYA KONSTRUKSI PEKERJAAN RIP/RAP BATU GUNUNG (MEKANIS)
1 m3 Urugan batu kali / gunung dengan truck crane hydraulic
Bahan
1.200 m' Batu Belah 15/20 @ Rp. 120,100.00
Alat Jumlah (I)
0.100 Hari Sewa Truck Crane @ Rp. 291,450.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
XIX. PEKERJAAN BONGKARAN DENGAN ANALIS BOW
Membongkar 1 m3 dinding tembok - tembok lbh tbl dr pada dua batu dan bata.
Tenaga
4.000 OH Pekerja @ Rp. 60,000.00
0.400 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 1 m3 dinding tembok 1/2 bata dan membersihkannya
Tenaga
2.000 OH Pekerja @ Rp. 60,000.00
0.100 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 10 m2 rangka atap dari kayu
Tenaga
1.000 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Kayu @ Rp. 90,000.00
0.025 OH Kepala Tukang Kayu @ Rp. 90,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
1 m2 papan nama proyek
Bahan
1.000 Lbr Plywood tebal 4 mm @ Rp. 77,625.00
0.250 kg Paku usuk 4" @ Rp. 14,000.00
0.021 m3 Kayu lokal usuk 5/7 x 200/250 @ Rp. 3,450,000.00
1.200 m2 Banner @ Rp. 31,000.00
Tenaga Jumlah (I)
0.500 OH Pekerja @ Rp. 60,000.00
0.500 OH Tukang Kayu @ Rp. 90,000.00
0.050 OH Kepala Tukang Kayu @ Rp. 90,000.00
0.010 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 rangka plafond hollow 60x60 cm
Bahan
4.000 m Hollow 2/4 - 4m @ Rp. 6,468.75
100%xrangk Ls Assesoris (perkuatan, las dll) @ Rp. 6,468.75
Tenaga Jumlah (I)
0.350 OH Pekerja @ Rp. 60,000.00
0.350 OH Tukang Besi @ Rp. 75,000.00
0.035 OH Kepala Tukang Besi @ Rp. 80,000.00
0.018 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 rangka plafond hollow 60x120 cm
Bahan
3.500 m Hollow 2/4 - 4m @ Rp. 6,468.75
0.110 kg Paku skrup @ Rp. 20,125.00
Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Besi @ Rp. 75,000.00
0.025 OH Kepala Tukang Besi @ Rp. 80,000.00
0.013 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 dinding pemisah kalsiboard rangkap, rangka galvalume
Bahan
0.542 btg Galvalume C-075 @ Rp. 86,825.00
0.150 kg Paku skrup @ Rp. 20,125.00
0.860 lembar Kalsiboard 4 mm @ Rp. 56,350.00
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Besi @ Rp. 75,000.00
0.045 OH Kepala Tukang Besi @ Rp. 80,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Memasang 1 m2 dinding pemisah Gypsumboard rangkap, rangka galvalume
Bahan
0.542 btg Galvalume C-075 @ Rp. 86,825.00
0.150 kg Paku skrup @ Rp. 20,125.00
0.860 lembar Gypsum board 9 mm @ Rp. 96,312.50
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
0.450 OH Tukang Besi @ Rp. 75,000.00
0.045 OH Kepala Tukang Besi @ Rp. 80,000.00
0.008 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120 cm, untuk partisi
Bahan
3.500 m' Besi Hollow 4 Cm x 4 Cm @ Rp. 16,291.67
100%xrangk Ls Assesoris (perkuatan,las dll ) @ Rp. 16,291.67
Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Besi @ Rp. 75,000.00
0.025 OH Kepala Tukang Besi @ Rp. 80,000.00
0.013 OH Mandor lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
` Pemasangan 1 m2 rangka galvalume 1x40.20.0,075, modul 60x120 cm, untuk partisi
Bahan
3.500 m' Galvalume C-075 @ Rp. 14,470.83
0.110 kg Paku skrup @ Rp. 20,125.00
Tenaga Jumlah (I)
0.250 OH Pekerja @ Rp. 60,000.00
0.250 OH Tukang Besi @ Rp. 75,000.00
0.025 OH Kepala Tukang Besi @ Rp. 80,000.00
0.013 OH Mandor lapangan @ Rp. 90,000.00
Jumlah (II)
Harga satuan pekerjaan
Harga setelah dibulatkan
a2 Membongkar 1 unit AC
Tenaga
2.000 OH Tukang Listrik @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 1 unit panel
Tenaga
2.000 OH Tukang Listrik @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 1 m² lantai keramik
Tenaga
0.250 OH Pekerja @ Rp. 60,000.00
0.050 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 1 m³ aspal
Tenaga
3.000 OH Pekerja @ Rp. 60,000.00
0.350 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
Membongkar 1 m² paving
Tenaga
0.250 OH Pekerja @ Rp. 60,000.00
0.025 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah
Harga setelah dibulatkan
1 m2 Pengecatan water profing 1x lapis
Bahan
25.000 kg Waterprofing @ Rp. 50,150.00
0.010 bh Kuas Uk 4" @ Rp. 19,300.00
Tenaga Jumlah (I)
0.150 OH Pekerja @ Rp. 60,000.00
1.500 OH Tukang cat @ Rp. 75,000.00
0.150 OH Kepala tukang cat @ Rp. 85,000.00
0.075 OH Mandor Lapangan @ Rp. 90,000.00
Jumlah (II)
Jumlah Pekerjaan 15m2
Harga satuan pekerjaan
Harga setelah dibulatkan

Banyuwangi, Februari 2017

KEPALA DINAS PEKERJAAN UMUM


BINA MARGA, CIPTA KARYA DAN TATA RU
KABUPATEN BANYUWANGI

Ir. H. MUJIONO, M.Si


Pembina Tk. I
NIP. 19660915 199602 1 002
AR ANALISA SATUAN PEKERJAAN
NTAH KABUPATEN BANYUWANGI
TAHUN 2017

= Rp. 14,437.50
= Rp. 6,850.00
= Rp. 1,000.00
= Rp. 1,275.75
= Rp. 248,400.00
= Rp. 840.00
= Rp. 272,803.25
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 1,800.00
= Rp. 45,600.00
= Rp. 318,403.25
= Rp. 318,400.00

= Rp. 82,110.00
= Rp. 120,750.00
= Rp. 7,035.00
= Rp. 1,680.00
= Rp. 18,500.00
= Rp. 16,440.00
= Rp. 246,515.00
= Rp. 10,800.00
= Rp. 9,000.00
= Rp. 7,000.00
= Rp. 450.00
= Rp. 27,250.00
= Rp. 273,765.00
= Rp. 273,760.00

= Rp. 82,110.00
= Rp. 127,000.00
= Rp. 702.50
= Rp. 18,500.00
= Rp. 16,440.00
= Rp. 244,752.50
= Rp. 12,000.00
= Rp. 7,500.00
= Rp. 7,000.00
= Rp. 1,800.00
= Rp. 28,300.00
= Rp. 273,052.50
= Rp. 273,050.00

= Rp. 14,437.50
= Rp. 3,425.00
= Rp. 82,110.00
= Rp. 1,000.00
= Rp. 1,275.75
= Rp. 248,400.00
= Rp. 840.00
= Rp. 17,181.00
= Rp. 368,669.25
= Rp. 12,000.00
= Rp. 36,000.00
= Rp. 1,800.00
= Rp. 1,800.00
= Rp. 51,600.00
= Rp. 420,269.25
= Rp. 420,260.00
= Rp. 11,550.00
= Rp. 2,740.00
= Rp. 46,250.00
= Rp. 1,000.00
= Rp. 1,275.75
= Rp. 840.00
= Rp. 63,655.75
= Rp. 12,000.00
= Rp. 27,000.00
= Rp. 1,800.00
= Rp. 1,800.00
= Rp. 42,600.00
= Rp. 106,255.75
= Rp. 106,250.00

= Rp. 41,400.00
= Rp. 280.00
= Rp. 34,615.00
= Rp. 76,295.00
= Rp. 6,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 16,350.00
= Rp. 92,645.00
= Rp. 92,640.00

= Rp. 14,437.50
= Rp. 621,000.00
= Rp. 1,120.00
= Rp. 22,495.00
= Rp. 47,950.00
= Rp. 27,750.00
= Rp. 20,000.00
= Rp. 21,262.50
= Rp. 22,500.00
= Rp. 20,843.75
= Rp. 1,510.00
= Rp. 6,884.00
= Rp. 7,650.00
= Rp. 4,657.50
= Rp. 840,060.25
= Rp. 120,000.00
= Rp. 180,000.00
= Rp. 70,000.00
= Rp. 27,000.00
= Rp. 4,500.00
= Rp. 401,500.00
= Rp. 1,241,560.25
= Rp. 1,241,560.00

= Rp. 19,635.00
= Rp. 724,500.00
= Rp. 4,200.00
= Rp. 14,385.00
= Rp. 6,000.00
= Rp. 7,087.50
= Rp. 102,637.50
= Rp. 20,843.75
= Rp. 899,288.75
= Rp. 60,000.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 4,500.00
= Rp. 262,500.00
= Rp. 1,161,788.75
= Rp. 1,161,780.00
= Rp. 34,650.00
= Rp. 952,200.00
= Rp. 9,800.00
= Rp. 102,637.50
= Rp. 1,099,287.50
= Rp. 60,000.00
= Rp. 135,000.00
= Rp. 13,500.00
= Rp. 4,500.00
= Rp. 213,000.00
= Rp. 1,312,287.50
= Rp. 1,312,280.00

= Rp. 172,500.00
= Rp. 46,575.00
= Rp. 35,620.00
= Rp. 18,500.00
= Rp. 39,750.00
= Rp. 10,500.00
= Rp. 37,950.00
= Rp. 4,500.00
= Rp. 28,885.85
= Rp. 37,974.00
= Rp. 7,550.00
= Rp. 27,710.00
= Rp. 468,014.85
= Rp. 72,000.00
= Rp. 28,000.00
= Rp. 3,600.00
= Rp. 4,500.00
= Rp. 108,100.00
= Rp. 576,114.85
= Rp. 576,110.00

= Rp. 6,000.00
= Rp. 4,500.00
= Rp. 10,500.00
= Rp. 10,500.00

= Rp. 14,437.50
= Rp. 641,700.00
= Rp. 4,200.00
= Rp. 24,660.00
= Rp. 6,000.00
= Rp. 7,087.50
= Rp. 102,637.50
= Rp. 104,793.75
= Rp. 905,516.25
= Rp. 60,000.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 4,500.00
= Rp. 262,500.00
= Rp. 1,168,016.25
= Rp. 1,168,010.00
= Rp. 111,245.40
= Rp. 1,120.00
= Rp. 591.68
= Rp. 112,957.08
= Rp. 27,000.00
= Rp. 2,700.00
= Rp. 29,700.00
= Rp. 142,657.08
= Rp. 142,650.00
= Rp. 17,968.75
= Rp. 3,682.80
= Rp. 21,651.55
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 18,000.00
= Rp. 4,500.00
= Rp. 46,500.00
= Rp. 68,151.55
= Rp. 68,150.00

= Rp. 800,040.00
= Rp. 59,940.00
= Rp. 859,980.00
= Rp. 859,980.00

= Rp. 400,020.00
= Rp. 29,970.00
= Rp. 429,990.00
= Rp. 429,990.00

= Rp. 20,125.00
20,125.00
= Rp. 49,079.50
49,079.50
= Rp. 72,000.00
= Rp. 10,800.00
82,800.00
= Rp. 152,004.50
= Rp. 152,000.00
= Rp. 45,000.00
= Rp. 2,250.00
= Rp. 47,250.00
= Rp. 47,250.00

= Rp. 54,000.00
= Rp. 4,050.00
= Rp. 58,050.00
= Rp. 58,050.00

= Rp. 63,000.00
= Rp. 6,030.00
= Rp. 69,030.00
= Rp. 69,030.00

= Rp. 60,000.00
= Rp. 2,880.00
= Rp. 62,880.00
= Rp. 62,880.00

= Rp. 90,000.00
= Rp. 5,400.00
= Rp. 95,400.00
= Rp. 95,400.00

= Rp. 72,000.00
= Rp. 4,050.00
= Rp. 76,050.00
= Rp. 76,050.00

= Rp. 3,000.00
= Rp. 450.00
= Rp. 3,450.00
= Rp. 3,450.00

= Rp. 19,800.00
= Rp. 900.00
= Rp. 20,700.00
= Rp. 20,700.00

= Rp. 15,750.00
= Rp. 15,750.00

= Rp. 19,350.00
= Rp. 19,350.00

= Rp. 23,010.00
= Rp. 23,010.00

= Rp. 20,960.00
= Rp. 20,960.00

= Rp. 31,800.00
= Rp. 31,800.00

= Rp. 25,350.00
= Rp. 25,350.00
= Rp. 30,000.00
= Rp. 4,500.00
= Rp. 34,500.00
= Rp. 34,500.00

= Rp. 180,000.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 900.00
= Rp. 18,900.00
= Rp. 198,900.00
= Rp. 198,900.00

= Rp. 55,296.00
= Rp. 74,000.00
= Rp. 88,164.00
= Rp. 217,460.00
= Rp. 48,000.00
= Rp. 28,000.00
= Rp. 3,600.00
= Rp. 7,200.00
= Rp. 86,800.00
= Rp. 304,260.00
= Rp. 304,260.00

= Rp. 101,580.80
= Rp. 115,320.00
= Rp. 216,900.80
= Rp. 48,000.00
= Rp. 28,000.00
= Rp. 3,600.00
= Rp. 7,200.00
= Rp. 86,800.00
= Rp. 303,700.80
= Rp. 303,700.00

= Rp. 118,800.00
= Rp. 118,800.00
= Rp. 9,000.00
= Rp. 1,350.00
= Rp. 10,350.00
= Rp. 129,150.00
= Rp. 129,150.00

= Rp. 154,800.00
= Rp. 154,800.00
= Rp. 15,000.00
= Rp. 2,250.00
= Rp. 17,250.00
= Rp. 172,050.00
= Rp. 172,050.00
= Rp. 111,600.00
= Rp. 111,600.00
= Rp. 15,000.00
= Rp. 2,250.00
= Rp. 17,250.00
= Rp. 128,850.00
= Rp. 128,850.00
= Rp. 91,800.00
= Rp. 91,800.00
= Rp. Rp 100,000.00
= Rp. Rp 55,000.00
= Rp. 155,000.00
= Rp. 193,200.00
= Rp. 193,200.00
= Rp. 440,000.00
= Rp. 440,000.00

= Rp. 91,800.00
= Rp. 91,800.00
= Rp. 100,000.00
= Rp. 55,000.00
= Rp. 100,000.00
= Rp. 255,000.00
= Rp. 276,000.00
= Rp. 276,000.00
= Rp. 622,800.00
= Rp. 622,800.00

= Rp. 20,400.00
= Rp. 20,400.00
= Rp. 105,000.00
= Rp. 60,000.00
= Rp. 165,000.00
= Rp. 57,500.00
= Rp. 57,500.00
= Rp. 242,900.00
= Rp. 242,900.00

= Rp. 170,000.00
= Rp. 170,000.00
= Rp. 100,000.00
= Rp. 55,000.00
= Rp. 155,000.00
= Rp. 914.29
= Rp. 914.29
= Rp. 325,914.29
= Rp. 325,910.00
= Rp. 144,120.00
= Rp. 276,740.00
= Rp. 89,725.00
= Rp. 510,585.00
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 666,585.00
= Rp. 666,580.00

= Rp. 144,120.00
= Rp. 223,310.00
= Rp. 96,200.00
= Rp. 463,630.00
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 619,630.00
= Rp. 619,630.00

= Rp. 144,120.00
= Rp. 186,320.00
= Rp. 100,640.00
= Rp. 431,080.00
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 587,080.00
= Rp. 587,080.00

= Rp. 144,120.00
= Rp. 160,290.00
= Rp. 103,785.00
= Rp. 408,195.00
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 564,195.00
= Rp. 564,190.00

= Rp. 144,120.00
= Rp. 124,670.00
= Rp. 108,040.00
= Rp. 376,830.00
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 532,830.00
= Rp. 532,830.00
= Rp. 144,120.00
= Rp. 83,570.00
= Rp. 60,211.20
= Rp. 91,020.00
= Rp. 378,921.20
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 534,921.20
= Rp. 534,920.00

= Rp. 144,120.00
= Rp. 56,170.00
= Rp. 53,657.60
= Rp. 96,755.00
= Rp. 350,702.60
= Rp. 90,000.00
= Rp. 52,500.00
= Rp. 6,750.00
= Rp. 6,750.00
= Rp. 156,000.00
= Rp. 506,702.60
= Rp. 506,700.00

= Rp. 144,120.00
= Rp. 64,800.00
= Rp. 208,920.00
= Rp. 46,800.00
= Rp. 27,300.00
= Rp. 3,510.00
= Rp. 3,510.00
= Rp. 81,120.00
= Rp. 290,040.00
= Rp. 290,040.00

= Rp. 57,648.00
= Rp. 265,780.00
= Rp. 62,400.00
= Rp. 66,339.00
= Rp. 1,260,000.00
= Rp. 25,290.00
= Rp. 1,737,457.00
= Rp. 204,000.00
= Rp. 59,500.00
= Rp. 7,650.00
= Rp. 15,300.00
= Rp. 286,450.00
= Rp. 2,023,907.00
= Rp. 2,023,900.00

= Rp. 54,045.00
= Rp. 265,780.00
= Rp. 62,400.00
= Rp. 66,339.00
= Rp. 448,564.00
= Rp. 144,000.00
= Rp. 56,000.00
= Rp. 7,200.00
= Rp. 10,710.00
= Rp. 217,910.00
= Rp. 666,474.00
= Rp. 666,470.00
= Rp. 315,100.00
= Rp. 127,571.43
= Rp. 266,249.75
= Rp. 3,000.00
= Rp. 711,921.18
= Rp. 72,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 5,400.00
= Rp. 93,200.00
= Rp. 805,121.18
= Rp. 805,120.00

= Rp. 338,390.00
= Rp. 124,142.86
= Rp. 258,990.75
= Rp. 3,225.00
= Rp. 724,748.61
= Rp. 79,380.00
= Rp. 13,230.00
= Rp. 1,710.00
= Rp. 11,880.00
= Rp. 106,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 865,448.61
= Rp. 865,440.00

= Rp. 378,120.00
= Rp. 118,285.71
= Rp. 262,361.00
= Rp. 3,225.00
= Rp. 761,991.71
= Rp. 79,380.00
= Rp. 13,230.00
= Rp. 1,710.00
= Rp. 11,880.00
= Rp. 106,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 902,691.71
= Rp. 902,690.00

= Rp. 409,630.00
= Rp. 114,142.86
= Rp. 263,657.25
= Rp. 3,225.00
= Rp. 790,655.11
= Rp. 79,380.00
= Rp. 13,230.00
= Rp. 1,710.00
= Rp. 11,880.00
= Rp. 106,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 931,355.11
= Rp. 931,350.00
= Rp. 315,100.00
= Rp. 127,571.43
= Rp. 266,249.75
= Rp. 3,000.00
= Rp. 711,921.18
= Rp. 72,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 5,400.00
= Rp. 93,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 839,621.18
= Rp. 839,620.00

= Rp. 446,620.00
= Rp. 108,571.43
= Rp. 266,768.25
= Rp. 3,225.00
= Rp. 825,184.68
= Rp. 79,380.00
= Rp. 13,230.00
= Rp. 1,710.00
= Rp. 11,880.00
= Rp. 106,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 965,884.68
= Rp. 965,880.00

= Rp. 944,265.00
= Rp. 944,265.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,105,178.20
= Rp. 1,105,170.00

= Rp. 508,270.00
= Rp. 99,714.29
= Rp. 271,434.75
= Rp. 3,225.00
= Rp. 882,644.04
= Rp. 79,380.00
= Rp. 13,230.00
= Rp. 1,710.00
= Rp. 11,880.00
= Rp. 106,200.00
= Rp. 34,500.00
= Rp. 34,500.00
= Rp. 1,023,344.04
= Rp. 1,023,340.00

= Rp. 961,860.00
= Rp. 961,860.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,122,773.20
= Rp. 1,122,770.00
= Rp. 973,590.00
= Rp. 973,590.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,134,503.20
= Rp. 1,134,500.00

= Rp. 985,320.00
= Rp. 985,320.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,146,233.20
= Rp. 1,146,230.00

= Rp. 997,050.00
= Rp. 997,050.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,157,963.20
= Rp. 1,157,960.00

= Rp. 1,043,970.00
= Rp. 1,043,970.00
= Rp. 60,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 9,000.00
= Rp. 88,750.00
= Rp. 72,163.20
= Rp. 72,163.20
= Rp. 1,204,883.20
= Rp. 1,204,880.00
t 24 jam diperlukan penambahan bahan tambahan sesuai

= Rp. 613,760.00
= Rp. 95,285.71
= Rp. 259,250.00
= Rp. 3,000.00
= Rp. 971,295.71
= Rp. 126,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 9,450.00
= Rp. 163,100.00
= Rp. 1,134,395.71
= Rp. 1,134,390.00
= Rp. 105,000.00
= Rp. 2,107.50
= Rp. 107,107.50
= Rp. 4,200.00
= Rp. 5,250.00
= Rp. 560.00
= Rp. 360.00
= Rp. 10,370.00
= Rp. 117,477.50
= Rp. 117,470.00

= Rp. 110,250.00
= Rp. 2,107.50
= Rp. 112,357.50
= Rp. 4,200.00
= Rp. 5,250.00
= Rp. 560.00
= Rp. 360.00
= Rp. 10,370.00
= Rp. 122,727.50
= Rp. 122,720.00

= Rp. 105,000.00
= Rp. 1,405.00
= Rp. 106,405.00
= Rp. 3,000.00
= Rp. 3,750.00
= Rp. 400.00
= Rp. 270.00
= Rp. 7,420.00
= Rp. 113,825.00
= Rp. 113,820.00

= Rp. 22,852.45
= Rp. 702.50
= Rp. 23,554.95
= Rp. 1,500.00
= Rp. 1,875.00
= Rp. 2,000.00
= Rp. 90.00
= Rp. 5,465.00
= Rp. 29,019.95
= Rp. 29,010.00

= Rp. 4,312,500.00
= Rp. 718,750.00

= Rp. 72,163.65
= Rp. 601,363.79
= Rp. 601,360.00

= Rp. 5,462,500.00
= Rp. 910,416.67

= Rp. 91,407.30
= Rp. 761,727.47
= Rp. 761,720.00

= Rp. 138,000.00
= Rp. 4,200.00
= Rp. 142,200.00
= Rp. 31,200.00
= Rp. 23,400.00
= Rp. 2,340.00
= Rp. 2,340.00
= Rp. 59,280.00
= Rp. 201,480.00
= Rp. 201,480.00
= Rp. 155,250.00
= Rp. 4,200.00
= Rp. 159,450.00
= Rp. 31,200.00
= Rp. 23,400.00
= Rp. 2,340.00
= Rp. 2,340.00
= Rp. 59,280.00
= Rp. 218,730.00
= Rp. 218,730.00

= Rp. 155,250.00
= Rp. 4,200.00
= Rp. 159,450.00
= Rp. 79,725.00
= Rp. 31,200.00
= Rp. 23,400.00
= Rp. 2,340.00
= Rp. 2,340.00
= Rp. 59,280.00
= Rp. 139,005.00
= Rp. 139,000.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 23,100.00
= Rp. 263,443.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 338,683.00
= Rp. 338,680.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 269,093.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 344,333.00
= Rp. 344,330.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 269,093.00
= Rp. 134,546.50
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 209,786.50
= Rp. 209,780.00
= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 75,036.60
= Rp. 34,212.50
= Rp. 23,100.00
= Rp. 275,949.10
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 351,189.10
= Rp. 351,180.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 75,036.60
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 281,599.10
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 356,839.10
= Rp. 356,830.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 75,036.60
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 281,599.10
= Rp. 140,799.55
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 216,039.55
= Rp. 216,030.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 69,300.00
= Rp. 309,643.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 384,883.00
= Rp. 384,880.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 86,250.00
= Rp. 326,593.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 401,833.00
= Rp. 401,830.00
= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 86,250.00
= Rp. 326,593.00
= Rp. 163,296.50
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 238,536.50
= Rp. 238,530.00

= Rp. 138,000.00
= Rp. 5,600.00
= Rp. 34,212.50
= Rp. 177,812.50
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 253,052.50
= Rp. 253,050.00

= Rp. 103,500.00
= Rp. 5,600.00
= Rp. 83,374.00
= Rp. 34,212.50
= Rp. 34,650.00
= Rp. 261,336.50
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 336,576.50
= Rp. 336,570.00

= Rp. 103,500.00
= Rp. 5,600.00
= Rp. 83,374.00
= Rp. 34,212.50
= Rp. 43,125.00
= Rp. 269,811.50
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 345,051.50
= Rp. 345,050.00
= Rp. 103,500.00
= Rp. 5,600.00
= Rp. 83,374.00
= Rp. 34,212.50
= Rp. 43,125.00
= Rp. 269,811.50
= Rp. 134,905.75
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 210,145.75
= Rp. 210,140.00
= Rp. 103,500.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 234,593.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 309,833.00
= Rp. 309,830.00

= Rp. 103,500.00
= Rp. 5,600.00
= Rp. 62,530.50
= Rp. 34,212.50
= Rp. 28,750.00
= Rp. 234,593.00
= Rp. 39,600.00
= Rp. 29,700.00
= Rp. 2,970.00
= Rp. 2,970.00
= Rp. 75,240.00
= Rp. 309,833.00
= Rp. 309,830.00

= Rp. 110,053.68
= Rp. 8,400.00
= Rp. 7,187.50
= Rp. 125,641.18
= Rp. 9,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 720.00
= Rp. 14,670.00
= Rp. 140,311.18
= Rp. 140,310.00

= Rp. 110,053.68
= Rp. 8,400.00
= Rp. 7,187.50
= Rp. 125,641.18
= Rp. 9,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 720.00
= Rp. 14,670.00
= Rp. 140,311.18
= Rp. 140,310.00

= Rp. 690,000.00
= Rp. 21,000.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 3,169,432.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,580.00
= Rp. 23,850.00
= Rp. 580,430.00
= Rp. 3,749,862.50
= Rp. 3,749,860.00
= Rp. 690,000.00
= Rp. 21,000.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 3,169,432.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,580.00
= Rp. 23,850.00
= Rp. 580,430.00
= Rp. 3,749,862.50
= Rp. 3,749,860.00

= Rp. 931,500.00
= Rp. 28,000.00
= Rp. 2,100,000.00
= Rp. 42,150.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 3,953,470.00
= Rp. 339,000.00
= Rp. 19,250.00
= Rp. 140,400.00
= Rp. 105,000.00
= Rp. 29,070.00
= Rp. 25,470.00
= Rp. 658,190.00
= Rp. 4,611,660.00
= Rp. 4,611,660.00

= Rp. 1,380,000.00
= Rp. 56,000.00
= Rp. 3,150,000.00
= Rp. 63,225.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 625,305.00
= Rp. 342,125.00
= Rp. 287,500.00
= Rp. 6,755,975.00
= Rp. 423,000.00
= Rp. 19,250.00
= Rp. 148,500.00
= Rp. 157,500.00
= Rp. 36,270.00
= Rp. 31,770.00
= Rp. 816,290.00
= Rp. 7,572,265.00
= Rp. 7,572,260.00
= Rp. 1,380,000.00
= Rp. 56,000.00
= Rp. 3,150,000.00
= Rp. 63,225.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 625,305.00
= Rp. 342,125.00
= Rp. 287,500.00
= Rp. 6,755,975.00
= Rp. 423,000.00
= Rp. 19,250.00
= Rp. 148,500.00
= Rp. 157,500.00
= Rp. 36,270.00
= Rp. 31,770.00
= Rp. 816,290.00
= Rp. 7,572,265.00
= Rp. 7,572,260.00

= Rp. 1,104,000.00
= Rp. 44,800.00
= Rp. 2,100,000.00
= Rp. 42,150.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 583,618.00
= Rp. 273,700.00
= Rp. 230,000.00
= Rp. 5,230,088.00
= Rp. 381,000.00
= Rp. 19,250.00
= Rp. 148,500.00
= Rp. 105,000.00
= Rp. 29,970.00
= Rp. 28,620.00
= Rp. 712,340.00
= Rp. 5,942,428.00
= Rp. 5,942,420.00

= Rp. 1,104,000.00
= Rp. 44,800.00
= Rp. 2,100,000.00
= Rp. 42,150.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 583,618.00
= Rp. 273,700.00
= Rp. 230,000.00
= Rp. 5,230,088.00
= Rp. 381,000.00
= Rp. 19,250.00
= Rp. 148,500.00
= Rp. 105,000.00
= Rp. 29,970.00
= Rp. 28,620.00
= Rp. 712,340.00
= Rp. 5,942,428.00
= Rp. 5,942,420.00
= Rp. 1,104,000.00
= Rp. 44,800.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 500,244.00
= Rp. 273,700.00
= Rp. 460,000.00
= Rp. 4,841,176.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,850.00
= Rp. 23,850.00
= Rp. 580,700.00
= Rp. 5,421,876.50
= Rp. 5,421,870.00

= Rp. 1,104,000.00
= Rp. 44,800.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 500,244.00
= Rp. 273,700.00
= Rp. 460,000.00
= Rp. 4,841,176.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,850.00
= Rp. 23,850.00
= Rp. 580,700.00
= Rp. 5,421,876.50
= Rp. 5,421,870.00

= Rp. 828,000.00
= Rp. 44,800.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 666,992.00
= Rp. 273,700.00
= Rp. 345,000.00
= Rp. 4,616,924.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,580.00
= Rp. 23,850.00
= Rp. 580,430.00
= Rp. 5,197,354.50
= Rp. 5,197,350.00
= Rp. 828,000.00
= Rp. 44,800.00
= Rp. 1,575,000.00
= Rp. 31,612.50
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 666,992.00
= Rp. 273,700.00
= Rp. 345,000.00
= Rp. 4,616,924.50
= Rp. 318,000.00
= Rp. 19,250.00
= Rp. 117,000.00
= Rp. 78,750.00
= Rp. 23,580.00
= Rp. 23,850.00
= Rp. 580,430.00
= Rp. 5,197,354.50
= Rp. 5,197,350.00

= Rp. 862,500.00
= Rp. 42,000.00
= Rp. 2,100,000.00
= Rp. 42,150.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 437,713.50
= Rp. 244,375.00
= Rp. 201,250.00
= Rp. 4,781,808.50
= Rp. 339,000.00
= Rp. 19,250.00
= Rp. 140,400.00
= Rp. 105,000.00
= Rp. 29,070.00
= Rp. 25,470.00
= Rp. 658,190.00
= Rp. 5,439,998.50
= Rp. 5,439,990.00

= Rp. 862,500.00
= Rp. 42,000.00
= Rp. 2,100,000.00
= Rp. 42,150.00
= Rp. 460,320.00
= Rp. 108,000.00
= Rp. 283,500.00
= Rp. 437,713.50
= Rp. 244,375.00
= Rp. 201,250.00
= Rp. 4,781,808.50
= Rp. 339,000.00
= Rp. 19,250.00
= Rp. 140,400.00
= Rp. 105,000.00
= Rp. 29,070.00
= Rp. 25,470.00
= Rp. 658,190.00
= Rp. 5,439,998.50
= Rp. 5,439,990.00
= Rp. 6,900.00
= Rp. 140.00
= Rp. 30,000.00
= Rp. 6,322.50
= Rp. 5,480.00
= Rp. 1,200.00
= Rp. 3,150.00
= Rp. 53,192.50
= Rp. 10,800.00
= Rp. 1,400.00
= Rp. 1,800.00
= Rp. 1,500.00
= Rp. 540.00
= Rp. 810.00
= Rp. 16,850.00
= Rp. 70,042.50
= Rp. 70,040.00

= Rp. 10,350.00
= Rp. 280.00
= Rp. 36,000.00
= Rp. 702.50
= Rp. 7,535.00
= Rp. 1,800.00
= Rp. 5,250.00
= Rp. 61,917.50
= Rp. 17,820.00
= Rp. 2,310.00
= Rp. 2,970.00
= Rp. 2,475.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,825.00
= Rp. 89,742.50
= Rp. 89,740.00

= Rp. 298,660.00
= Rp. 96,200.00
= Rp. 304,500.00
= Rp. 699,360.00
= Rp. 99,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 7,200.00
= Rp. 125,950.00
= Rp. 825,310.00
= Rp. 825,310.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP

= Rp. 105,000.00
= Rp. 59,595.00
= Rp. 14,800.00
= Rp. 179,395.00
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 233,895.00
= Rp. 233,890.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP

= Rp. 105,000.00
= Rp. 45,141.50
= Rp. 16,835.00
= Rp. 166,976.50
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 221,476.50
= Rp. 221,470.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP

= Rp. 105,000.00
= Rp. 36,373.50
= Rp. 17,205.00
= Rp. 158,578.50
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 213,078.50
= Rp. 213,070.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP

= Rp. 105,000.00
= Rp. 30,414.00
= Rp. 18,870.00
= Rp. 154,284.00
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 208,784.00
= Rp. 208,780.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP

= Rp. 105,000.00
= Rp. 25,345.00
= Rp. 22,570.00
= Rp. 152,915.00
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 207,415.00
= Rp. 207,410.00
an (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP

= Rp. 105,000.00
= Rp. 13,809.60
= Rp. 17,112.50
= Rp. 11,264.00
= Rp. 147,186.10
= Rp. 36,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 2,700.00
= Rp. 54,500.00
= Rp. 201,686.10
= Rp. 201,680.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 2 PP

= Rp. 52,500.00
= Rp. 25,961.50
= Rp. 7,030.00
= Rp. 85,491.50
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 112,741.50
= Rp. 112,740.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 3 PP

= Rp. 52,500.00
= Rp. 19,686.90
= Rp. 7,400.00
= Rp. 79,586.90
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 106,836.90
= Rp. 106,830.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 4 PP

= Rp. 52,500.00
= Rp. 15,755.00
= Rp. 7,955.00
= Rp. 76,210.00
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 103,460.00
= Rp. 103,460.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 5 PP

= Rp. 52,500.00
= Rp. 13,261.60
= Rp. 8,325.00
= Rp. 74,086.60
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 101,336.60
= Rp. 101,330.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 6 PP

= Rp. 52,500.00
= Rp. 11,398.40
= Rp. 9,065.00
= Rp. 72,963.40
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 100,213.40
= Rp. 100,210.00
an (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 8 PP

= Rp. 52,500.00
= Rp. 8,905.00
= Rp. 9,250.00
= Rp. 70,655.00
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 97,905.00
= Rp. 97,900.00

= Rp. 258,750.00
= Rp. 15,070.00
= Rp. 6,475.00
= Rp. 280,295.00
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 307,545.00
= Rp. 307,540.00

= Rp. 258,750.00
= Rp. 15,070.00
= Rp. 6,475.00
= Rp. 280,295.00
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 307,545.00
= Rp. 307,540.00
spos ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 P

= Rp. 56,000.00
= Rp. 19,180.00
= Rp. 5,920.00
= Rp. 81,100.00
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 112,300.00
= Rp. 112,300.00
= Rp. 21,240.48
= Rp. 2,960.00
= Rp. 24,200.48
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 55,400.48
= Rp. 55,400.00

= Rp. 14,006.88
= Rp. 3,700.00
= Rp. 17,706.88
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 48,906.88
= Rp. 48,900.00

= Rp. 10,653.12
= Rp. 4,255.00
= Rp. 14,908.12
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 46,108.12
= Rp. 46,100.00

= Rp. 8,548.80
= Rp. 4,440.00
= Rp. 12,988.80
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 44,188.80
= Rp. 44,180.00

= Rp. 7,102.08
= Rp. 4,810.00
= Rp. 11,912.08
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 43,112.08
= Rp. 43,110.00

= Rp. 6,049.92
= Rp. 4,995.00
= Rp. 11,044.92
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 42,244.92
= Rp. 42,240.00
= Rp. 5,392.32
= Rp. 5,180.00
= Rp. 10,572.32
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 41,772.32
= Rp. 41,770.00

= Rp. 4,734.72
= Rp. 5,365.00
= Rp. 10,099.72
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 41,299.72
= Rp. 41,290.00

= Rp. 7,891.20
= Rp. 1,228.80
= Rp. 2,405.00
= Rp. 11,525.00
= Rp. 21,600.00
= Rp. 8,400.00
= Rp. 1,080.00
= Rp. 1,620.00
= Rp. 32,700.00
= Rp. 44,225.00
= Rp. 44,220.00

= Rp. 4,110.00
= Rp. 2,048.00
= Rp. 3,700.00
= Rp. 9,858.00
= Rp. 21,600.00
= Rp. 8,400.00
= Rp. 1,080.00
= Rp. 1,620.00
= Rp. 32,700.00
= Rp. 42,558.00
= Rp. 42,550.00

= Rp. 12.33
= Rp. 3,686.40
= Rp. 1,665.00
= Rp. 5,363.73
= Rp. 26,400.00
= Rp. 8,400.00
= Rp. 1,080.00
= Rp. 1,620.00
= Rp. 37,500.00
= Rp. 42,863.73
= Rp. 42,860.00

= Rp. 9.59
= Rp. 2,867.20
= Rp. 2,775.00
= Rp. 5,651.79
= Rp. 21,600.00
= Rp. 8,400.00
= Rp. 1,080.00
= Rp. 1,620.00
= Rp. 32,700.00
= Rp. 38,351.79
= Rp. 38,350.00
= Rp. 18,675.84
= Rp. 4,995.00
= Rp. 23,670.84
= Rp. 24,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 1,980.00
= Rp. 41,780.00
= Rp. 65,450.84
= Rp. 65,450.00

= Rp. 14,204.16
= Rp. 5,735.00
= Rp. 19,939.16
= Rp. 15,600.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 1,170.00
= Rp. 32,570.00
= Rp. 52,509.16
= Rp. 52,500.00

= Rp. 11,398.40
= Rp. 5,920.00
= Rp. 17,318.40
= Rp. 24,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 1,980.00
= Rp. 41,780.00
= Rp. 59,098.40
= Rp. 59,090.00

= Rp. 9,469.44
= Rp. 6,475.00
= Rp. 15,944.44
= Rp. 24,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 1,980.00
= Rp. 41,780.00
= Rp. 57,724.44
= Rp. 57,720.00

= Rp. 8,066.56
= Rp. 6,660.00
= Rp. 14,726.56
= Rp. 24,000.00
= Rp. 14,000.00
= Rp. 1,800.00
= Rp. 1,980.00
= Rp. 41,780.00
= Rp. 56,506.56
= Rp. 56,500.00
= Rp. 12.33
= Rp. 3,686.40
= Rp. 3,330.00
= Rp. 7,028.73
= Rp. 26,400.00
= Rp. 15,400.00
= Rp. 1,980.00
= Rp. 1,980.00
= Rp. 45,760.00
= Rp. 52,788.73
= Rp. 52,780.00
= Rp. 7,102.08
= Rp. 4,810.00
= Rp. 11,912.08
= Rp. 9,000.00
= Rp. 5,250.00
= Rp. 720.00
= Rp. 720.00
= Rp. 15,690.00
= Rp. 27,602.08
= Rp. 27,600.00

= Rp. 685.00
= Rp. 2,405.00
= Rp. 3,090.00
= Rp. 4,800.00
= Rp. 28,000.00
= Rp. 3,600.00
= Rp. 360.00
= Rp. 36,760.00
= Rp. 39,850.00
= Rp. 39,850.00

= Rp. 685.00
= Rp. 2,405.00
= Rp. 3,090.00
= Rp. 4,800.00
= Rp. 28,000.00
= Rp. 3,600.00
= Rp. 360.00
= Rp. 36,760.00
= Rp. 39,850.00
= Rp. 39,850.00

= Rp. 5,918.40
= Rp. 1,110.00
= Rp. 7,028.40
= Rp. 18,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 1,350.00
= Rp. 27,250.00
= Rp. 34,278.40
= Rp. 34,270.00
= Rp. 4,257.96
= Rp. 4,257.96
= Rp. 9,000.00
= Rp. 5,250.00
= Rp. 720.00
= Rp. 720.00
= Rp. 15,690.00
= Rp. 19,947.96
= Rp. 19,940.00

= Rp. 2,192.00
= Rp. 2,192.00
= Rp. 4,200.00
= Rp. 2,450.00
= Rp. 360.00
= Rp. 360.00
= Rp. 7,370.00
= Rp. 9,562.00
= Rp. 9,560.00

= Rp. 8,685.80
= Rp. 2,220.00
= Rp. 10,905.80
= Rp. 18,000.00
= Rp. 10,500.00
= Rp. 1,350.00
= Rp. 1,350.00
= Rp. 31,200.00
= Rp. 42,105.80
= Rp. 42,100.00

= Rp. 4,452.50
= Rp. 4,452.50
= Rp. 12,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 900.00
= Rp. 20,800.00
= Rp. 25,252.50
= Rp. 25,250.00

= Rp. 4,110.00
= Rp. 4,110.00
= Rp. 12,000.00
= Rp. 7,000.00
= Rp. 900.00
= Rp. 900.00
= Rp. 20,800.00
= Rp. 24,910.00
= Rp. 24,910.00
= Rp. 20,901,320.00
= Rp. 17,500.00
= Rp. 28,750.00
= Rp. 20,947,570.00
= Rp. 420,000.00
= Rp. 1,890,000.00
= Rp. 189,000.00
= Rp. 31,500.00
= Rp. 2,530,500.00
= Rp. 23,478,070.00
= Rp. 23,478,070.00

= Rp. 11,592,000.00
= Rp. 17,500.00
= Rp. 21,000.00
= Rp. 11,630,500.00
= Rp. 360,000.00
= Rp. 1,620,000.00
= Rp. 162,000.00
= Rp. 27,000.00
= Rp. 2,169,000.00
= Rp. 13,799,500.00
= Rp. 13,799,500.00

= Rp. 460,000.00
= Rp. 700.00
= Rp. 460,700.00
= Rp. 21,000.00
= Rp. 94,500.00
= Rp. 9,450.00
= Rp. 1,620.00
= Rp. 126,570.00
= Rp. 587,270.00
= Rp. 587,270.00

= Rp. 726,978.00
= Rp. 7,000.00
= Rp. 733,978.00
= Rp. 60,000.00
= Rp. 270,000.00
= Rp. 27,000.00
= Rp. 4,500.00
= Rp. 361,500.00
= Rp. 1,095,478.00
= Rp. 1,095,470.00

= Rp. 460,000.00
= Rp. 7,000.00
= Rp. 467,000.00
= Rp. 60,000.00
= Rp. 270,000.00
= Rp. 27,000.00
= Rp. 4,500.00
= Rp. 361,500.00
= Rp. 828,500.00
= Rp. 828,500.00

= Rp. 436,186.80
= Rp. 4,200.00
= Rp. 440,386.80
= Rp. 48,000.00
= Rp. 216,000.00
= Rp. 21,600.00
= Rp. 3,600.00
= Rp. 289,200.00
= Rp. 729,586.80
= Rp. 729,580.00
= Rp. 276,000.00
= Rp. 4,200.00
= Rp. 280,200.00
= Rp. 48,000.00
= Rp. 216,000.00
= Rp. 21,600.00
= Rp. 3,600.00
= Rp. 289,200.00
= Rp. 569,400.00
= Rp. 569,400.00

= Rp. 1,163,164.80
= Rp. 14,375.00
= Rp. 1,177,539.80
= Rp. 60,000.00
= Rp. 270,000.00
= Rp. 27,000.00
= Rp. 4,500.00
= Rp. 361,500.00
= Rp. 1,539,039.80
= Rp. 1,539,030.00

= Rp. 736,000.00
= Rp. 14,375.00
= Rp. 750,375.00
= Rp. 60,000.00
= Rp. 270,000.00
= Rp. 27,000.00
= Rp. 4,500.00
= Rp. 361,500.00
= Rp. 1,111,875.00
= Rp. 1,111,870.00
wood) rangkap, rangka tertutup kayu kamper (lebar sampai 90 cm)

= Rp. 287,500.00
= Rp. 356.25
= Rp. 14,375.00
= Rp. 77,625.00
= Rp. 379,856.25
= Rp. 42,000.00
= Rp. 189,000.00
= Rp. 18,900.00
= Rp. 3,150.00
= Rp. 253,050.00
= Rp. 632,906.25
= Rp. 632,900.00

= Rp. 465,265.92
= Rp. 356.25
= Rp. 14,375.00
= Rp. 77,625.00
= Rp. 557,622.17
= Rp. 48,000.00
= Rp. 216,000.00
= Rp. 21,600.00
= Rp. 3,600.00
= Rp. 289,200.00
= Rp. 846,822.17
= Rp. 846,820.00

= Rp. 294,400.00
= Rp. 356.25
= Rp. 14,375.00
= Rp. 77,625.00
= Rp. 386,756.25
= Rp. 48,000.00
= Rp. 216,000.00
= Rp. 21,600.00
= Rp. 3,600.00
= Rp. 289,200.00
= Rp. 675,956.25
= Rp. 675,950.00
= Rp. 842,649.00
= Rp. 1,781.25
= Rp. 844,430.25
= Rp. 40,200.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 30,150.00
= Rp. 268,350.00
= Rp. 1,112,780.25
= Rp. 1,112,780.00

= Rp. 431,250.00
= Rp. 1,781.25
= Rp. 433,031.25
= Rp. 40,200.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 30,150.00
= Rp. 268,350.00
= Rp. 701,381.25
= Rp. 701,380.00

= Rp. 1,050,000.00
= Rp. 1,781.25
= Rp. 1,051,781.25
= Rp. 40,200.00
= Rp. 180,000.00
= Rp. 18,000.00
= Rp. 30,150.00
= Rp. 268,350.00
= Rp. 1,320,131.25
= Rp. 1,320,130.00

= Rp. 179,687.50
= Rp. 356.25
= Rp. 8,625.00
= Rp. 123,625.00
= Rp. 312,293.75
= Rp. 48,000.00
= Rp. 216,000.00
= Rp. 21,600.00
= Rp. 3,600.00
= Rp. 289,200.00
= Rp. 601,493.75
= Rp. 601,490.00

= Rp. 8,728,500.00
= Rp. 306,750.00
= Rp. 47,320.00
= Rp. 9,082,570.00
= Rp. 240,000.00
= Rp. 1,080,000.00
= Rp. 108,000.00
= Rp. 18,000.00
= Rp. 1,446,000.00
= Rp. 10,528,570.00
= Rp. 10,528,570.00

= Rp. 22,801,440.00
= Rp. 306,750.00
= Rp. 47,320.00
= Rp. 23,155,510.00
= Rp. 402,000.00
= Rp. 1,800,900.00
= Rp. 180,900.00
= Rp. 30,150.00
= Rp. 2,413,950.00
= Rp. 25,569,460.00
= Rp. 25,569,460.00
= Rp. 6,325,000.00
= Rp. 306,750.00
= Rp. 25,350.00
= Rp. 6,657,100.00
= Rp. 402,000.00
= Rp. 1,809,000.00
= Rp. 180,900.00
= Rp. 30,150.00
= Rp. 2,422,050.00
= Rp. 9,079,150.00
= Rp. 9,079,150.00

= Rp. 8,728,500.00
= Rp. 306,750.00
= Rp. 25,350.00
= Rp. 9,060,600.00
= Rp. 402,000.00
= Rp. 1,809,000.00
= Rp. 180,900.00
= Rp. 30,150.00
= Rp. 2,422,050.00
= Rp. 11,482,650.00
= Rp. 11,482,650.00

= Rp. 84,525.00
= Rp. 258,750.00
= Rp. 3,500.00
= Rp. 346,775.00
= Rp. 6,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 16,350.00
= Rp. 363,125.00
= Rp. 363,120.00

= Rp. 84,525.00
= Rp. 409,687.50
= Rp. 3,500.00
= Rp. 497,712.50
= Rp. 6,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 16,350.00
= Rp. 514,062.50
= Rp. 514,060.00

= Rp. 111,090.00
= Rp. 798.00
= Rp. 111,888.00
= Rp. 7,200.00
= Rp. 10,800.00
= Rp. 1,080.00
= Rp. 540.00
= Rp. 19,620.00
= Rp. 131,508.00
= Rp. 131,500.00

= Rp. 75,267.50
= Rp. 2,800.00
= Rp. 78,067.50
= Rp. 9,000.00
= Rp. 27,000.00
= Rp. 2,700.00
= Rp. 6,750.00
= Rp. 45,450.00
= Rp. 123,517.50
= Rp. 123,510.00
= Rp. 79,666.25
= Rp. 3,500.00
= Rp. 83,166.25
= Rp. 12,000.00
= Rp. 27,000.00
= Rp. 2,700.00
= Rp. 900.00
= Rp. 42,600.00
= Rp. 125,766.25
= Rp. 125,760.00

= Rp. 124,200.00
= Rp. 1,400.00
= Rp. 125,600.00
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 151,850.00
= Rp. 151,850.00

= Rp. 124,200.00
= Rp. 1,400.00
= Rp. 125,600.00
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 151,850.00
= Rp. 151,850.00

= Rp. 70,173.00
= Rp. 1,400.00
= Rp. 71,573.00
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 97,823.00
= Rp. 97,820.00

= Rp. 126,500.00
= Rp. 700.00
= Rp. 127,200.00
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 153,450.00
= Rp. 153,450.00
= Rp. 71,472.50
= Rp. 700.00
= Rp. 72,172.50
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 98,422.50
= Rp. 98,420.00

= Rp. 161,000.00
= Rp. 2,100.00
= Rp. 163,100.00
= Rp. 9,000.00
= Rp. 40,500.00
= Rp. 4,050.00
= Rp. 720.00
= Rp. 54,270.00
= Rp. 217,370.00
= Rp. 217,370.00
= Rp. 161,000.00
= Rp. 2,100.00
= Rp. 106,317.50
= Rp. 16,100.00
= Rp. 285,517.50
= Rp. 9,000.00
= Rp. 40,500.00
= Rp. 4,050.00
= Rp. 720.00
= Rp. 54,270.00
= Rp. 339,787.50
= Rp. 339,780.00

= Rp. 161,000.00
= Rp. 2,100.00
= Rp. 106,317.50
= Rp. 16,100.00
= Rp. 285,517.50
= Rp. 12,000.00
= Rp. 54,000.00
= Rp. 5,400.00
= Rp. 900.00
= Rp. 72,300.00
= Rp. 357,817.50
= Rp. 357,810.00

= Rp. 52,785.00
= Rp. 25,875.00
= Rp. 350.00
= Rp. 79,010.00
= Rp. 9,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 19,350.00
= Rp. 98,360.00
= Rp. 98,360.00

= Rp. 25,990.00
= Rp. 237.50
= Rp. 26,227.50
= Rp. 1,680.00
= Rp. 7,200.00
= Rp. 720.00
= Rp. 126.00
= Rp. 9,726.00
= Rp. 35,953.50
= Rp. 35,950.00

= Rp. 28,910.43
= Rp. 4,657.50
= Rp. 1,187.50
= Rp. 34,755.43
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 450.00
= Rp. 26,250.00
= Rp. 61,005.43
= Rp. 61,000.00

= Rp. 300,437.50
= Rp. 300,437.50
= Rp. 12,384.00
= Rp. 18,576.00
= Rp. 1,857.60
= Rp. 907.20
= Rp. 33,724.80
= Rp. 334,162.30
= Rp. 334,160.00
KERJAAN PENUTUP LANTAI DAN DINDING

= Rp. 52,875.45
= Rp. 13,700.00
= Rp. 8,325.00
= Rp. 74,900.45
= Rp. 15,000.00
= Rp. 8,750.00
= Rp. 1,170.00
= Rp. 1,170.00
= Rp. 26,090.00
= Rp. 100,990.45
= Rp. 100,990.00

= Rp. 54,116.41
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 75,867.41
= Rp. 15,000.00
= Rp. 8,750.00
= Rp. 1,170.00
= Rp. 1,170.00
= Rp. 26,090.00
= Rp. 101,957.41
= Rp. 101,950.00

= Rp. 54,116.41
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 75,867.41
= Rp. 15,000.00
= Rp. 8,750.00
= Rp. 1,170.00
= Rp. 1,170.00
= Rp. 26,090.00
= Rp. 101,957.41
= Rp. 101,950.00

= Rp. 49,502.00
= Rp. 14,248.00
= Rp. 8,325.00
= Rp. 316.25
= Rp. 72,391.25
= Rp. 16,200.00
= Rp. 9,450.00
= Rp. 1,260.00
= Rp. 1,260.00
= Rp. 28,170.00
= Rp. 100,561.25
= Rp. 100,560.00

= Rp. 52,875.45
= Rp. 13,700.00
= Rp. 8,325.00
= Rp. 474.38
= Rp. 75,374.83
= Rp. 15,600.00
= Rp. 9,100.00
= Rp. 1,170.00
= Rp. 1,170.00
= Rp. 27,040.00
= Rp. 102,414.83
= Rp. 102,410.00

= Rp. 60,738.00
= Rp. 14,248.00
= Rp. 8,325.00
= Rp. 512.33
= Rp. 83,823.33
= Rp. 16,200.00
= Rp. 9,450.00
= Rp. 1,260.00
= Rp. 1,260.00
= Rp. 28,170.00
= Rp. 111,993.33
= Rp. 111,990.00
= Rp. 41,711.00
= Rp. 14,248.00
= Rp. 8,325.00
= Rp. 64,284.00
= Rp. 16,200.00
= Rp. 9,450.00
= Rp. 1,260.00
= Rp. 1,260.00
= Rp. 28,170.00
= Rp. 92,454.00
= Rp. 92,450.00

= Rp. 77,115.00
= Rp. 11,220.30
= Rp. 8,325.00
= Rp. 869.69
= Rp. 97,529.99
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 170,329.99
= Rp. 170,320.00

= Rp. 49,350.00
= Rp. 13,700.00
= Rp. 8,325.00
= Rp. 158.13
= Rp. 71,533.13
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 144,333.13
= Rp. 144,330.00

= Rp. 51,450.00
= Rp. 13,700.00
= Rp. 8,325.00
= Rp. 158.13
= Rp. 73,633.13
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 146,433.13
= Rp. 146,430.00

= Rp. 55,532.88
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 411.13
= Rp. 77,695.01
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 150,495.01
= Rp. 150,490.00

= Rp. 60,253.44
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 411.13
= Rp. 82,415.57
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 155,215.57
= Rp. 155,210.00
= Rp. 2,226.00
= Rp. 14,248.00
= Rp. 8,325.00
= Rp. 158.13
= Rp. 24,957.13
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 97,757.13
= Rp. 97,750.00

= Rp. 2,583.00
= Rp. 14,248.00
= Rp. 8,325.00
= Rp. 158.13
= Rp. 25,314.13
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 98,114.13
= Rp. 98,110.00

= Rp. 7,711.50
= Rp. 1,561.80
= Rp. 555.00
= Rp. 7.91
= Rp. 9,836.21
= Rp. 5,400.00
= Rp. 6,300.00
= Rp. 3,150.00
= Rp. 450.00
= Rp. 15,300.00
= Rp. 25,136.21
= Rp. 25,130.00

= Rp. 11,040.00
= Rp. 156.18
= Rp. 185.00
= Rp. 1.58
= Rp. 11,382.76
= Rp. 5,400.00
= Rp. 6,300.00
= Rp. 810.00
= Rp. 450.00
= Rp. 12,960.00
= Rp. 24,342.76
= Rp. 24,340.00

= Rp. 20,328.00
= Rp. 10,062.50
= Rp. 30,390.50
= Rp. 10,200.00
= Rp. 15,300.00
= Rp. 1,530.00
= Rp. 810.00
= Rp. 27,840.00
= Rp. 58,230.50
= Rp. 58,230.00

= Rp. 381,663.45
= Rp. 17,250.00
= Rp. 398,913.45
= Rp. 42,000.00
= Rp. 31,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 79,800.00
= Rp. 478,713.45
= Rp. 478,710.00
= Rp. 472,500.00
= Rp. 17,250.00
= Rp. 489,750.00
= Rp. 42,000.00
= Rp. 31,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 79,800.00
= Rp. 569,550.00
= Rp. 569,550.00

= Rp. 55,125.00
= Rp. 10,062.50
= Rp. 65,187.50
= Rp. 7,200.00
= Rp. 10,800.00
= Rp. 1,080.00
= Rp. 540.00
= Rp. 19,620.00
= Rp. 84,807.50
= Rp. 84,800.00

= Rp. 624.88
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 158.13
= Rp. 16,854.00
= Rp. 60,000.00
= Rp. 35,000.00
= Rp. 4,500.00
= Rp. 4,500.00
= Rp. 104,000.00
= Rp. 120,854.00
= Rp. 120,850.00

= Rp. 77,115.00
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 869.69
= Rp. 94,055.69
= Rp. 54,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 4,050.00
= Rp. 93,600.00
= Rp. 187,655.69
= Rp. 187,650.00

= Rp. 67,500.00
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 869.69
= Rp. 84,440.69
= Rp. 54,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 4,050.00
= Rp. 93,600.00
= Rp. 178,040.69
= Rp. 178,040.00

= Rp. 75,000.00
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 869.69
= Rp. 91,940.69
= Rp. 54,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 4,050.00
= Rp. 93,600.00
= Rp. 185,540.69
= Rp. 185,540.00
= Rp. 56,180.00
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 613.53
= Rp. 72,864.53
= Rp. 54,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 4,050.00
= Rp. 93,600.00
= Rp. 166,464.53
= Rp. 166,460.00

= Rp. 65,190.00
= Rp. 12,741.00
= Rp. 3,330.00
= Rp. 613.53
= Rp. 81,874.53
= Rp. 54,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 4,050.00
= Rp. 93,600.00
= Rp. 175,474.53
= Rp. 175,470.00

= Rp. 119,955.00
= Rp. 16,097.50
= Rp. 6,475.00
= Rp. 142,527.50
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 215,327.50
= Rp. 215,320.00

= Rp. 163,900.00
= Rp. 16,097.50
= Rp. 6,475.00
= Rp. 186,472.50
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 259,272.50
= Rp. 259,270.00

= Rp. 120,175.00
= Rp. 16,097.50
= Rp. 6,475.00
= Rp. 142,747.50
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 215,547.50
= Rp. 215,540.00

= Rp. 240,562.50
= Rp. 6,850.00
= Rp. 4,625.00
= Rp. 252,037.50
= Rp. 14,400.00
= Rp. 8,400.00
= Rp. 1,080.00
= Rp. 2,160.00
= Rp. 26,040.00
= Rp. 278,077.50
= Rp. 278,070.00
= Rp. 4,499.00
= Rp. 7,187.50
= Rp. 11,686.50
= Rp. 21,000.00
= Rp. 15,750.00
= Rp. 1,530.00
= Rp. 180.00
= Rp. 38,460.00
= Rp. 50,146.50
= Rp. 50,140.00

= Rp. 49,500.00
= Rp. 555.00
= Rp. 316.25
= Rp. 50,371.25
= Rp. 2,700.00
= Rp. 3,150.00
= Rp. 450.00
= Rp. 450.00
= Rp. 6,750.00
= Rp. 57,121.25
= Rp. 57,120.00

= Rp. 415,004.88
= Rp. 13,700.00
= Rp. 474.38
= Rp. 208.13
= Rp. 429,387.38
= Rp. 15,600.00
= Rp. 9,100.00
= Rp. 1,170.00
= Rp. 1,170.00
= Rp. 27,040.00
= Rp. 456,427.38
= Rp. 456,420.00

= Rp. 174,307.29
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 411.13
= Rp. 196,469.42
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 269,269.42
= Rp. 269,260.00

= Rp. 470,142.36
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 411.13
= Rp. 492,304.49
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 565,104.49
= Rp. 565,100.00

= Rp. 191,296.88
= Rp. 13,426.00
= Rp. 8,325.00
= Rp. 411.13
= Rp. 213,459.00
= Rp. 42,000.00
= Rp. 24,500.00
= Rp. 3,150.00
= Rp. 3,150.00
= Rp. 72,800.00
= Rp. 286,259.00
= Rp. 286,250.00
= Rp. 330,750.00
= Rp. 17,042.80
= Rp. 4,625.00
= Rp. 205.56
= Rp. 352,623.36
= Rp. 78,000.00
= Rp. 45,500.00
= Rp. 5,850.00
= Rp. 5,850.00
= Rp. 135,200.00
= Rp. 487,823.36
= Rp. 487,820.00
= Rp. 43,725.00
= Rp. 205.00
= Rp. 43,930.00
= Rp. 1,800.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 360.00
= Rp. 9,090.00
= Rp. 53,020.00
= Rp. 53,020.00

= Rp. 56,320.00
= Rp. 205.00
= Rp. 56,525.00
= Rp. 1,800.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 360.00
= Rp. 9,090.00
= Rp. 65,615.00
= Rp. 65,610.00

= Rp. 63,635.00
= Rp. 205.00
= Rp. 63,840.00
= Rp. 1,800.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 360.00
= Rp. 9,090.00
= Rp. 72,930.00
= Rp. 72,930.00

= Rp. 23,503.13
= Rp. 362.25
= Rp. 23,865.38
= Rp. 6,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 16,350.00
= Rp. 40,215.38
= Rp. 40,210.00

= Rp. 35,057.75
= Rp. 2,213.75
= Rp. 37,271.50
= Rp. 6,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 450.00
= Rp. 11,400.00
= Rp. 48,671.50
= Rp. 48,670.00

= Rp. 20,511.40
= Rp. 2,213.75
= Rp. 22,725.15
= Rp. 6,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 450.00
= Rp. 11,400.00
= Rp. 34,125.15
= Rp. 34,120.00

= Rp. 272,616.75
= Rp. 120.75
= Rp. 272,737.50
= Rp. 48,000.00
= Rp. 72,000.00
= Rp. 7,200.00
= Rp. 3,600.00
= Rp. 130,800.00
= Rp. 403,537.50
= Rp. 403,530.00
= Rp. 28,376.25
= Rp. 21.56
= Rp. 28,397.81
= Rp. 3,600.00
= Rp. 5,400.00
= Rp. 540.00
= Rp. 270.00
= Rp. 9,810.00
= Rp. 38,207.81
= Rp. 38,200.00

= Rp. 25,462.50
= Rp. 21.56
= Rp. 25,484.06
= Rp. 3,600.00
= Rp. 5,400.00
= Rp. 540.00
= Rp. 270.00
= Rp. 9,810.00
= Rp. 35,294.06
= Rp. 35,290.00

= Rp. 13,545.00
= Rp. 212.00
= Rp. 13,757.00
= Rp. 3,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 270.00
= Rp. 8,220.00
= Rp. 21,977.00
= Rp. 21,970.00

= Rp. 17,710.00
= Rp. 120.75
= Rp. 17,830.75
= Rp. 1,800.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 360.00
= Rp. 9,090.00
= Rp. 26,920.75
= Rp. 26,920.00
= Rp. 14,605.00
= Rp. 14,605.00
= Rp. 3,600.00
= Rp. 4,500.00
= Rp. 480.00
= Rp. 270.00
= Rp. 8,850.00
= Rp. 23,455.00
= Rp. 23,450.00

= Rp. 18,400.00
= Rp. 18,400.00
= Rp. 3,600.00
= Rp. 4,500.00
= Rp. 480.00
= Rp. 270.00
= Rp. 8,850.00
= Rp. 27,250.00
= Rp. 27,250.00

= Rp. 19,435.00
= Rp. 19,435.00
= Rp. 3,600.00
= Rp. 4,500.00
= Rp. 480.00
= Rp. 270.00
= Rp. 8,850.00
= Rp. 28,285.00
= Rp. 28,280.00

= Rp. 8,500.00
= Rp. 3,400.00
= Rp. 11,900.00
= Rp. 6,000.00
= Rp. 8,000.00
= Rp. 90.00
= Rp. 450.00
= Rp. 14,540.00
= Rp. 322.40
= Rp. 322.40
= Rp. 26,762.40
= Rp. 26,760.00

= Rp. 190,500.00
= Rp. 633,040.00
= Rp. 1,523.75
= Rp. 825,063.75
= Rp. 63,000.00
= Rp. 84,000.00
= Rp. 9,450.00
= Rp. 4,680.00
= Rp. 161,130.00
= Rp. 986,193.75
= Rp. 986,190.00

= Rp. 12,190.00
= Rp. 2,550.00
= Rp. 1,360.00
= Rp. 16,100.00
= Rp. 2,400.00
= Rp. 1,600.00
= Rp. 180.00
= Rp. 180.00
= Rp. 4,360.00
= Rp. 6,851.00
= Rp. 6,851.00
= Rp. 27,311.00
= Rp. 27,310.00

= Rp. 151,800.00
= Rp. 300.00
= Rp. 1,932.00
= Rp. 154,032.00
= Rp. 2,580.00
= Rp. 3,225.00
= Rp. 344.00
= Rp. 189.00
= Rp. 6,338.00
= Rp. 160,370.00
= Rp. 160,370.00
= Rp. 136,290.00
= Rp. 300.00
= Rp. 1,932.00
= Rp. 138,522.00
= Rp. 2,580.00
= Rp. 3,225.00
= Rp. 344.00
= Rp. 189.00
= Rp. 6,338.00
= Rp. 144,860.00
= Rp. 144,860.00

= Rp. 124,960.00
= Rp. 300.00
= Rp. 1,932.00
= Rp. 127,192.00
= Rp. 2,580.00
= Rp. 3,225.00
= Rp. 344.00
= Rp. 189.00
= Rp. 6,338.00
= Rp. 133,530.00
= Rp. 133,530.00

= Rp. 459,580.00
= Rp. 450,410.00
= Rp. 909,990.00
= Rp. 5,100.00
= Rp. 6,375.00
= Rp. 680.00
= Rp. 378.00
= Rp. 12,533.00
= Rp. 922,523.00
= Rp. 922,520.00

= Rp. 727,100.00
= Rp. 36,225.00
= Rp. 8,694.00
= Rp. 772,019.00
= Rp. 5,100.00
= Rp. 6,375.00
= Rp. 720.00
= Rp. 450.00
= Rp. 12,645.00
= Rp. 784,664.00
= Rp. 784,660.00

= Rp. 680,900.00
= Rp. 36,225.00
= Rp. 8,694.00
= Rp. 725,819.00
= Rp. 5,100.00
= Rp. 6,375.00
= Rp. 720.00
= Rp. 450.00
= Rp. 12,645.00
= Rp. 738,464.00
= Rp. 738,460.00

= Rp. 459,580.00
= Rp. 36,225.00
= Rp. 8,694.00
= Rp. 504,499.00
= Rp. 5,100.00
= Rp. 6,375.00
= Rp. 720.00
= Rp. 450.00
= Rp. 12,645.00
= Rp. 517,144.00
= Rp. 517,140.00
= Rp. 119,216.10
= Rp. 64,992.00
= Rp. 184,208.10
= Rp. 100,200.00
= Rp. 125,250.00
= Rp. 13,360.00
= Rp. 7,470.00
= Rp. 246,280.00
= Rp. 430,488.10
= Rp. 430,480.00

= Rp. 22,137.50
= Rp. 26,664.00
= Rp. 33,118.80
= Rp. 81,920.30
= Rp. 6,000.00
= Rp. 7,500.00
= Rp. 800.00
= Rp. 450.00
= Rp. 14,750.00
= Rp. 96,670.30
= Rp. 96,670.00

= Rp. 8,305.00
= Rp. 1,500.00
= Rp. 71,750.00
= Rp. 81,555.00
= Rp. 12,000.00
= Rp. 16,000.00
= Rp. 1,800.00
= Rp. 90.00
= Rp. 29,890.00
= Rp. 111,445.00
= Rp. 111,440.00

= Rp. 87,543.75
= Rp. 307.50
= Rp. 92,862.50
= Rp. 180,713.75
= Rp. 12,000.00
= Rp. 16,000.00
= Rp. 1,800.00
= Rp. 900.00
= Rp. 30,700.00
= Rp. 211,413.75
= Rp. 211,410.00

= Rp. 16,905.00
= Rp. 205.00
= Rp. 5,125.00
= Rp. 22,235.00
= Rp. 9,000.00
= Rp. 24,000.00
= Rp. 2,700.00
= Rp. 720.00
= Rp. 36,420.00
= Rp. 58,655.00
= Rp. 58,650.00
= Rp. 52,500.00
= Rp. 52,500.00
= Rp. 9,000.00
= Rp. 6,750.00
= Rp. 675.00
= Rp. 720.00
= Rp. 17,145.00
= Rp. 69,645.00
= Rp. 69,640.00

= Rp. 31,250.00
= Rp. 31,250.00
= Rp. 9,000.00
= Rp. 6,750.00
= Rp. 720.00
= Rp. 720.00
= Rp. 17,190.00
= Rp. 48,440.00
= Rp. 48,440.00

= Rp. 38,750.00
= Rp. 38,750.00
= Rp. 9,000.00
= Rp. 6,750.00
= Rp. 720.00
= Rp. 720.00
= Rp. 17,190.00
= Rp. 55,940.00
= Rp. 55,940.00

= Rp. 83,750.00
= Rp. 83,750.00
= Rp. 9,000.00
= Rp. 6,750.00
= Rp. 720.00
= Rp. 720.00
= Rp. 17,190.00
= Rp. 100,940.00
= Rp. 100,940.00

= Rp. 57,750.00
= Rp. 356.25
= Rp. 57,750.00
= Rp. 12,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 900.00
= Rp. 22,800.00
= Rp. 80,550.00
= Rp. 80,550.00

= Rp. 99,618.75
= Rp. 1,700.00
= Rp. 101,318.75
= Rp. 9,000.00
= Rp. 6,750.00
= Rp. 7,200.00
= Rp. 540.00
= Rp. 23,490.00
= Rp. 124,808.75
= Rp. 124,800.00

= Rp. 99,705.00
= Rp. 1,700.00
= Rp. 101,405.00
= Rp. 12,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 90.00
= Rp. 21,990.00
= Rp. 123,395.00
= Rp. 123,390.00
= Rp. 93,840.00
= Rp. 1,700.00
= Rp. 95,540.00
= Rp. 12,000.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 90.00
= Rp. 21,990.00
= Rp. 117,530.00
= Rp. 117,530.00

= Rp. 53,000.00
= Rp. 10,960.00
= Rp. 5,920.00
= Rp. 69,880.00
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 180.00
= Rp. 43,980.00
= Rp. 113,860.00
= Rp. 113,860.00

= Rp. 17,250.00
= Rp. 10,960.00
= Rp. 5,920.00
= Rp. 34,130.00
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 180.00
= Rp. 43,980.00
= Rp. 78,110.00
= Rp. 78,110.00

= Rp. 34,000.00
= Rp. 10,960.00
= Rp. 5,920.00
= Rp. 50,880.00
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 180.00
= Rp. 43,980.00
= Rp. 94,860.00
= Rp. 94,860.00

= Rp. 37,250.00
= Rp. 10,960.00
= Rp. 5,920.00
= Rp. 54,130.00
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 180.00
= Rp. 43,980.00
= Rp. 98,110.00
= Rp. 98,110.00

= Rp. 40,250.00
= Rp. 1,006.25
= Rp. 14,796.00
= Rp. 5,920.00
= Rp. 316.25
= Rp. 62,288.50
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 180.00
= Rp. 43,980.00
= Rp. 106,268.50
= Rp. 106,260.00
= Rp. 36,685.00
= Rp. 425.00
= Rp. 37,110.00
= Rp. 15,000.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 1,170.00
= Rp. 31,020.00
= Rp. 68,130.00
= Rp. 68,130.00

= Rp. 27,597.50
= Rp. 2,682.00
= Rp. 30,279.50
= Rp. 8,400.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 630.00
= Rp. 15,960.00
= Rp. 46,239.50
= Rp. 46,230.00

= Rp. 63,250.00
= Rp. 2,682.00
= Rp. 65,932.00
= Rp. 8,400.00
= Rp. 6,750.00
= Rp. 720.00
= Rp. 720.00
= Rp. 16,590.00
= Rp. 82,522.00
= Rp. 82,520.00

= Rp. 35,910.00
= Rp. 3,000.00
= Rp. 38,910.00
= Rp. 5,040.00
= Rp. 11,250.00
= Rp. 1,170.00
= Rp. 360.00
= Rp. 17,820.00
= Rp. 56,730.00
= Rp. 56,730.00

= Rp. 47,897.50
= Rp. 410.00
= Rp. 48,307.50
= Rp. 7,200.00
= Rp. 5,400.00
= Rp. 540.00
= Rp. 540.00
= Rp. 13,680.00
= Rp. 61,987.50
= Rp. 61,980.00
= Rp. 8,625.00
= Rp. 820.00
= Rp. 9,445.00
= Rp. 9,000.00
= Rp. 6,300.00
= Rp. 630.00
= Rp. 540.00
= Rp. 16,470.00
= Rp. 25,915.00
= Rp. 25,910.00

= Rp. 40,250.00
= Rp. 1,025.00
= Rp. 14,796.00
= Rp. 5,920.00
= Rp. 12,650.00
= Rp. 74,641.00
= Rp. 24,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 1,800.00
= Rp. 45,600.00
= Rp. 120,241.00
= Rp. 120,240.00
= Rp. 34,155.00
= Rp. 10,250.00
= Rp. 44,405.00
= Rp. 15,000.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 1,170.00
= Rp. 31,020.00
= Rp. 75,425.00
= Rp. 75,420.00

= Rp. 115,500.00
= Rp. 2,460.00
= Rp. 117,960.00
= Rp. 8,400.00
= Rp. 6,030.00
= Rp. 630.00
= Rp. 630.00
= Rp. 15,690.00
= Rp. 133,650.00
= Rp. 133,650.00

= Rp. 168,000.00
= Rp. 2,460.00
= Rp. 170,460.00
= Rp. 8,400.00
= Rp. 6,030.00
= Rp. 630.00
= Rp. 630.00
= Rp. 15,690.00
= Rp. 186,150.00
= Rp. 186,150.00

= Rp. 291,600.00
= Rp. 1,025.00
= Rp. 292,625.00
= Rp. 8,400.00
= Rp. 6,030.00
= Rp. 630.00
= Rp. 630.00
= Rp. 15,690.00
= Rp. 308,315.00
= Rp. 308,310.00
= Rp. 1,380,000.00
= Rp. 82,800.00
= Rp. 1,462,800.00
= Rp. 198,000.00
= Rp. 77,000.00
= Rp. 800.00
= Rp. 14,400.00
= Rp. 290,200.00
= Rp. 1,753,000.00
= Rp. 1,753,000.00

= Rp. 2,518,500.00
= Rp. 151,110.00
= Rp. 2,669,610.00
= Rp. 198,000.00
= Rp. 77,000.00
= Rp. 800.00
= Rp. 14,400.00
= Rp. 290,200.00
= Rp. 2,959,810.00
= Rp. 2,959,810.00

= Rp. 116,550.00
= Rp. 8,220.00
= Rp. 1,850.00
= Rp. 126,620.00
= Rp. 60,000.00
= Rp. 105,000.00
= Rp. 12,000.00
= Rp. 14,400.00
= Rp. 191,400.00
= Rp. 318,020.00
= Rp. 318,020.00

= Rp. 1,725,000.00
= Rp. 517,500.00
= Rp. 8,220.00
= Rp. 1,850.00
= Rp. 2,252,570.00
= Rp. 60,000.00
= Rp. 70,000.00
= Rp. 8,000.00
= Rp. 4,500.00
= Rp. 142,500.00
= Rp. 2,395,070.00
= Rp. 2,395,070.00

= Rp. 3,680,000.00
= Rp. 1,104,000.00
= Rp. 8,220.00
= Rp. 1,850.00
= Rp. 4,794,070.00
= Rp. 60,000.00
= Rp. 70,000.00
= Rp. 8,000.00
= Rp. 4,500.00
= Rp. 142,500.00
= Rp. 4,936,570.00
= Rp. 4,936,570.00

= Rp. 602,400.00
= Rp. 150,600.00
= Rp. 8,220.00
= Rp. 1,850.00
= Rp. 763,070.00
= Rp. 72,000.00
= Rp. 101,500.00
= Rp. 12,000.00
= Rp. 5,400.00
= Rp. 190,900.00
= Rp. 953,970.00
= Rp. 953,970.00
= Rp. 770,500.00
= Rp. 92,460.00

= Rp. 862,960.00
= Rp. 18,000.00
= Rp. 31,500.00
= Rp. 4,050.00
= Rp. 1,350.00
= Rp. 54,900.00
= Rp. 917,860.00
= Rp. 917,860.00

= Rp. 112,500.00
= Rp. 164,400.00
= Rp. 55,500.00
= Rp. 195,200.00
= Rp. 1,897.50
= Rp. 529,497.50
= Rp. 360,000.00
= Rp. 210,000.00
= Rp. 27,000.00
= Rp. 2,700.00
= Rp. 599,700.00
= Rp. 1,129,197.50
= Rp. 1,129,190.00

= Rp. 287,500.00
= Rp. 38,600.00
= Rp. 326,100.00
= Rp. 1,800.00
= Rp. 21,000.00
= Rp. 2,700.00
= Rp. 1,350.00
= Rp. 26,850.00
= Rp. 352,950.00
= Rp. 352,950.00

= Rp. 25,740.00
= Rp. 10,044.64
= Rp. 5,370.40
= Rp. 10,360.00
= Rp. 90.00
= Rp. 51,605.04
= Rp. 8,400.00
= Rp. 4,900.00
= Rp. 630.00
= Rp. 630.00
= Rp. 14,560.00
= Rp. 66,165.04
= Rp. 66,160.00

= Rp. 37,290.00
= Rp. 10,044.64
= Rp. 5,370.40
= Rp. 10,360.00
= Rp. 90.00
= Rp. 63,155.04
= Rp. 8,400.00
= Rp. 4,900.00
= Rp. 630.00
= Rp. 630.00
= Rp. 14,560.00
= Rp. 77,715.04
= Rp. 77,710.00

= Rp. 46,750.00
= Rp. 204,613.10
= Rp. 14,111.00
= Rp. 11,285.00
= Rp. 258.75
= Rp. 277,017.85
= Rp. 22,800.00
= Rp. 13,300.00
= Rp. 1,710.00
= Rp. 1,710.00
= Rp. 39,520.00
= Rp. 316,537.85
= Rp. 316,530.00
= Rp. 51,260.00
= Rp. 204,613.10
= Rp. 14,111.00
= Rp. 11,285.00
= Rp. 258.75
= Rp. 281,527.85
= Rp. 22,800.00
= Rp. 13,300.00
= Rp. 1,710.00
= Rp. 1,710.00
= Rp. 39,520.00
= Rp. 321,047.85
= Rp. 321,040.00

= Rp. 63,030.00
= Rp. 204,613.10
= Rp. 14,111.00
= Rp. 11,285.00
= Rp. 258.75
= Rp. 293,297.85
= Rp. 22,800.00
= Rp. 13,300.00
= Rp. 1,710.00
= Rp. 1,710.00
= Rp. 39,520.00
= Rp. 332,817.85
= Rp. 332,810.00

= Rp. 30,000.00
= Rp. 60,280.00
= Rp. 12,950.00
= Rp. 18,200.00
= Rp. 16,000.00
= Rp. 300.00
= Rp. 137,730.00
= Rp. 129,600.00
= Rp. 50,400.00
= Rp. 6,480.00
= Rp. 990.00
= Rp. 187,470.00
= Rp. 325,200.00
= Rp. 325,200.00

= Rp. 52,500.00
= Rp. 105,490.00
= Rp. 24,050.00
= Rp. 5,200.00
= Rp. 26,000.00
= Rp. 450.00
= Rp. 213,690.00
= Rp. 192,000.00
= Rp. 80,500.00
= Rp. 990.00
= Rp. 1,440.00
= Rp. 274,930.00
= Rp. 488,620.00
= Rp. 488,620.00

= Rp. 92,250.00
= Rp. 156,180.00
= Rp. 34,040.00
= Rp. 8,580.00
= Rp. 48,500.00
= Rp. 600.00
= Rp. 340,150.00
= Rp. 192,000.00
= Rp. 80,500.00
= Rp. 990.00
= Rp. 1,440.00
= Rp. 274,930.00
= Rp. 615,080.00
= Rp. 615,080.00

= Rp. 26,250.00
= Rp. 7,656.25
= Rp. 33,906.25
= Rp. 3,240.00
= Rp. 6,300.00
= Rp. 720.00
= Rp. 2,430.00
= Rp. 12,690.00
= Rp. 46,596.25
= Rp. 46,590.00
= Rp. 31,470.00
= Rp. 9,178.75
= Rp. 40,648.75
= Rp. 3,240.00
= Rp. 6,300.00
= Rp. 720.00
= Rp. 2,430.00
= Rp. 12,690.00
= Rp. 53,338.75
= Rp. 53,330.00

= Rp. 47,250.00
= Rp. 13,781.25
= Rp. 61,031.25
= Rp. 3,240.00
= Rp. 6,300.00
= Rp. 720.00
= Rp. 2,430.00
= Rp. 12,690.00
= Rp. 73,721.25
= Rp. 73,720.00

= Rp. 103,190.00
= Rp. 30,097.08
= Rp. 133,287.08
= Rp. 6,480.00
= Rp. 12,600.00
= Rp. 1,440.00
= Rp. 486.00
= Rp. 21,006.00
= Rp. 154,293.08
= Rp. 154,290.00

= Rp. 69,970.00
= Rp. 20,407.92
= Rp. 90,377.92
= Rp. 6,480.00
= Rp. 12,600.00
= Rp. 1,440.00
= Rp. 486.00
= Rp. 21,006.00
= Rp. 111,383.92
= Rp. 111,380.00

= Rp. 169,252.00
= Rp. 49,365.17
= Rp. 218,617.17
= Rp. 8,100.00
= Rp. 15,750.00
= Rp. 1,840.00
= Rp. 630.00
= Rp. 26,320.00
= Rp. 244,937.17
= Rp. 244,930.00
= Rp. 247,726.00
= Rp. 72,253.42
= Rp. 319,979.42
= Rp. 8,100.00
= Rp. 15,750.00
= Rp. 1,840.00
= Rp. 630.00
= Rp. 26,320.00
= Rp. 346,299.42
= Rp. 346,290.00

= Rp. 8,625.00
= Rp. 2,515.63
= Rp. 11,140.63
= Rp. 2,160.00
= Rp. 4,200.00
= Rp. 480.00
= Rp. 162.00
= Rp. 7,002.00
= Rp. 18,142.63
= Rp. 18,140.00
= Rp. 10,920.00
= Rp. 3,185.00
= Rp. 14,105.00
= Rp. 2,160.00
= Rp. 4,200.00
= Rp. 480.00
= Rp. 162.00
= Rp. 7,002.00
= Rp. 21,107.00
= Rp. 21,100.00

= Rp. 13,570.00
= Rp. 3,957.92
= Rp. 17,527.92
= Rp. 2,160.00
= Rp. 4,200.00
= Rp. 480.00
= Rp. 162.00
= Rp. 7,002.00
= Rp. 24,529.92
= Rp. 24,520.00

= Rp. 25,162.00
= Rp. 7,338.92
= Rp. 32,500.92
= Rp. 3,240.00
= Rp. 6,300.00
= Rp. 720.00
= Rp. 270.00
= Rp. 10,530.00
= Rp. 43,030.92
= Rp. 43,030.00

= Rp. 37,260.00
= Rp. 10,867.50
= Rp. 48,127.50
= Rp. 3,240.00
= Rp. 6,300.00
= Rp. 720.00
= Rp. 270.00
= Rp. 10,530.00
= Rp. 58,657.50
= Rp. 58,650.00

= Rp. 68,701.00
= Rp. 20,037.79
= Rp. 88,738.79
= Rp. 4,860.00
= Rp. 9,450.00
= Rp. 1,080.00
= Rp. 360.00
= Rp. 15,750.00
= Rp. 104,488.79
= Rp. 104,480.00
= Rp. 100,510.00
= Rp. 29,315.42
= Rp. 129,825.42
= Rp. 4,860.00
= Rp. 9,450.00
= Rp. 1,080.00
= Rp. 360.00
= Rp. 15,750.00
= Rp. 145,575.42
= Rp. 145,570.00

= Rp. 202,860.00
= Rp. 59,167.50
= Rp. 262,027.50
= Rp. 4,860.00
= Rp. 9,450.00
= Rp. 1,080.00
= Rp. 360.00
= Rp. 15,750.00
= Rp. 277,777.50
= Rp. 277,770.00
= Rp. 308,400.00
= Rp. 89,950.00
= Rp. 398,350.00
= Rp. 4,860.00
= Rp. 9,450.00
= Rp. 1,080.00
= Rp. 360.00
= Rp. 15,750.00
= Rp. 414,100.00
= Rp. 414,100.00

= Rp. 427,800.00
= Rp. 124,775.00
= Rp. 552,575.00
= Rp. 4,860.00
= Rp. 9,450.00
= Rp. 1,080.00
= Rp. 360.00
= Rp. 15,750.00
= Rp. 568,325.00
= Rp. 568,320.00

= Rp. 21,500.00
= Rp. 2,700.00
= Rp. 24,200.00
= Rp. 600.00
= Rp. 28,000.00
= Rp. 3,200.00
= Rp. 450.00
= Rp. 32,250.00
= Rp. 56,450.00
= Rp. 56,450.00

= Rp. 22,050.00
= Rp. 2,700.00
= Rp. 24,750.00
= Rp. 600.00
= Rp. 28,000.00
= Rp. 3,200.00
= Rp. 450.00
= Rp. 32,250.00
= Rp. 57,000.00
= Rp. 57,000.00

= Rp. 52,350.00
= Rp. 2,700.00
= Rp. 55,050.00
= Rp. 600.00
= Rp. 28,000.00
= Rp. 3,200.00
= Rp. 450.00
= Rp. 32,250.00
= Rp. 87,300.00
= Rp. 87,300.00
= Rp. 56,250.00
= Rp. 2,700.00
= Rp. 58,950.00
= Rp. 600.00
= Rp. 7,000.00
= Rp. 800.00
= Rp. 450.00
= Rp. 8,850.00
= Rp. 67,800.00
= Rp. 67,800.00

= Rp. 92,000.00
= Rp. 500.00
= Rp. 92,500.00
= Rp. 600.00
= Rp. 7,000.00
= Rp. 800.00
= Rp. 450.00
= Rp. 8,850.00
= Rp. 101,350.00
= Rp. 101,350.00
= Rp. 175,375.00
= Rp. 175,375.00
= Rp. 600.00
= Rp. 7,000.00
= Rp. 800.00
= Rp. 450.00
= Rp. 8,850.00
= Rp. 184,225.00
= Rp. 184,220.00

= Rp. 85,000.00
= Rp. 2,700.00
= Rp. 87,700.00
= Rp. 600.00
= Rp. 7,000.00
= Rp. 800.00
= Rp. 450.00
= Rp. 8,850.00
= Rp. 96,550.00
= Rp. 96,550.00

= Rp. 143,750.00
= Rp. 2,700.00
= Rp. 146,450.00
= Rp. 600.00
= Rp. 7,000.00
= Rp. 800.00
= Rp. 450.00
= Rp. 8,850.00
= Rp. 155,300.00
= Rp. 155,300.00

= Rp. 287,500.00
= Rp. 38,600.00
= Rp. 326,100.00
= Rp. 1,800.00
= Rp. 21,000.00
= Rp. 2,400.00
= Rp. 1,350.00
= Rp. 26,550.00
= Rp. 352,650.00
= Rp. 352,650.00
= Rp. 51,000.00
= Rp. 51,000.00
= Rp. 600.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 450.00
= Rp. 50,550.00
= Rp. 101,550.00
= Rp. 101,550.00

= Rp. 57,500.00
= Rp. 57,500.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 270.00
= Rp. 50,070.00
= Rp. 107,570.00
= Rp. 107,570.00

= Rp. 66,125.00
= Rp. 66,125.00
= Rp. 600.00
= Rp. 45,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 46,950.00
= Rp. 113,075.00
= Rp. 113,070.00

= Rp. 49,450.00
= Rp. 49,450.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 270.00
= Rp. 50,070.00
= Rp. 99,520.00
= Rp. 99,520.00

= Rp. 186,875.00
= Rp. 186,875.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 450.00
= Rp. 22.50
= Rp. 45,772.50
= Rp. 232,647.50
= Rp. 232,640.00

= Rp. 1,700,000.00
= Rp. 1,700,000.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 450.00
= Rp. 22.50
= Rp. 45,772.50
= Rp. 1,745,772.50
= Rp. 1,745,770.00

= Rp. 700,000.00
= Rp. 700,000.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 450.00
= Rp. 22.50
= Rp. 45,772.50
= Rp. 745,772.50
= Rp. 745,770.00
= Rp. 550,000.00
= Rp. 550,000.00
= Rp. 300.00
= Rp. 45,000.00
= Rp. 450.00
= Rp. 22.50
= Rp. 45,772.50
= Rp. 595,772.50
= Rp. 595,770.00

= Rp. 33,500.00
= Rp. 33,500.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 67.50
= Rp. 15,817.50
= Rp. 49,317.50
= Rp. 49,310.00

= Rp. 20,000.00
= Rp. 20,000.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 67.50
= Rp. 15,817.50
= Rp. 35,817.50
= Rp. 35,810.00

= Rp. 15,525.00
= Rp. 15,525.00
= Rp. 6,000.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 45.00
= Rp. 25,845.00
= Rp. 41,370.00
= Rp. 41,370.00

= Rp. 51,650.00
= Rp. 51,650.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 67.50
= Rp. 15,817.50
= Rp. 67,467.50
= Rp. 67,460.00

= Rp. 15,850.00
= Rp. 15,850.00
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 45.00
= Rp. 10,545.00
= Rp. 26,395.00
= Rp. 26,390.00

= Rp. 23,575.00
= Rp. 23,575.00
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 45.00
= Rp. 10,545.00
= Rp. 34,120.00
= Rp. 34,120.00

= Rp. 12,937.50
= Rp. 12,937.50
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 45.00
= Rp. 10,545.00
= Rp. 23,482.50
= Rp. 23,480.00
= Rp. 18,975.00
= Rp. 18,975.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 720.00
= Rp. 16,470.00
= Rp. 35,445.00
= Rp. 35,440.00

= Rp. 24,725.00
= Rp. 24,725.00
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 45.00
= Rp. 10,545.00
= Rp. 35,270.00
= Rp. 35,270.00

= Rp. 26,650.00
= Rp. 26,650.00
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 45.00
= Rp. 10,545.00
= Rp. 37,195.00
= Rp. 37,190.00

= Rp. 10,000.00
= Rp. 10,000.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 720.00
= Rp. 16,470.00
= Rp. 26,470.00
= Rp. 26,470.00

= Rp. 172,500.00
= Rp. 172,500.00
= Rp. 3,000.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 225.00
= Rp. 52,725.00
= Rp. 225,225.00
= Rp. 225,220.00

= Rp. 66,125.00
= Rp. 66,125.00
= Rp. 1,200.00
= Rp. 18,000.00
= Rp. 1,800.00
= Rp. 90.00
= Rp. 21,090.00
= Rp. 87,215.00
= Rp. 87,210.00

= Rp. 46,000.00
= Rp. 46,000.00
= Rp. 3,000.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 225.00
= Rp. 52,725.00
= Rp. 98,725.00
= Rp. 98,720.00

= Rp. 51,750.00
= Rp. 51,750.00
= Rp. 600.00
= Rp. 9,000.00
= Rp. 900.00
= Rp. 450.00
= Rp. 10,950.00
= Rp. 62,700.00
= Rp. 62,700.00
= Rp. 94,655.00
= Rp. 94,655.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 72.00
= Rp. 15,822.00
= Rp. 110,477.00
= Rp. 110,470.00

= Rp. 94,655.00
= Rp. 1,610.00
= Rp. 96,265.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 72.00
= Rp. 15,822.00
= Rp. 112,087.00
= Rp. 112,080.00

= Rp. 118,992.50
= Rp. 118,992.50
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 67.50
= Rp. 15,817.50
= Rp. 134,810.00
= Rp. 134,810.00

= Rp. 115,500.00
= Rp. 115,500.00
= Rp. 900.00
= Rp. 13,500.00
= Rp. 1,350.00
= Rp. 720.00
= Rp. 16,470.00
= Rp. 131,970.00
= Rp. 131,970.00

= Rp. 1,567,500.00
= Rp. 1,567,500.00
= Rp. 1,500.00
= Rp. 22,500.00
= Rp. 2,250.00
= Rp. 117.00
= Rp. 26,367.00
= Rp. 1,593,867.00
= Rp. 1,593,860.00
= Rp. 1,337.50
= Rp. 1,337.50
= Rp. 9,000.00
= Rp. 270.00
= Rp. 9,270.00
= Rp. 10,607.50
= Rp. 10,600.00

= Rp. 4,312.50
= Rp. 10,244.20
= Rp. 10,244.20
= Rp. 24,800.90
= Rp. 4,200.00
= Rp. 5,625.00
= Rp. 637.50
= Rp. 225.00
= Rp. 10,687.50
= Rp. 35,488.40
= Rp. 35,480.00

= Rp. 7,636.00
= Rp. 4,312.50
= Rp. 10,244.20
= Rp. 15,667.60
= Rp. 193.00
= Rp. 630.00
= Rp. 1,070.00
= Rp. 39,753.30
= Rp. 4,200.00
= Rp. 675.00
= Rp. 510.00
= Rp. 225.00
= Rp. 5,610.00
= Rp. 45,363.30
= Rp. 45,360.00

= Rp. 7,636.00
= Rp. 4,312.50
= Rp. 10,244.20
= Rp. 21,091.00
= Rp. 193.00
= Rp. 630.00
= Rp. 1,070.00
= Rp. 45,176.70
= Rp. 4,200.00
= Rp. 7,875.00
= Rp. 340.00
= Rp. 225.00
= Rp. 12,640.00
= Rp. 57,816.70
= Rp. 57,810.00

= Rp. 11,557.50
= Rp. 28,662.60
= Rp. 10,700.00
= Rp. 50,920.10
= Rp. 2,400.00
= Rp. 4,500.00
= Rp. 1,360.00
= Rp. 225.00
= Rp. 8,485.00
= Rp. 59,405.10
= Rp. 59,400.00

= Rp. 9,918.75
= Rp. 1,437.50
= Rp. 535.00
= Rp. 11,891.25
= Rp. 9,600.00
= Rp. 12,000.00
= Rp. 1,360.00
= Rp. 225.00
= Rp. 23,185.00
= Rp. 35,076.25
= Rp. 35,070.00
= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 13,156.00
= Rp. 21,033.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 27,719.00
= Rp. 27,710.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 10,920.00
= Rp. 18,797.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 25,483.00
= Rp. 25,480.00

= Rp. 2,817.50
= Rp. 5,060.00
= Rp. 18,174.00
= Rp. 26,051.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 32,737.00
= Rp. 32,730.00

= Rp. 6,072.00
= Rp. 9,108.00
= Rp. 15,180.00
= Rp. 1,680.00
= Rp. 3,150.00
= Rp. 357.00
= Rp. 225.00
= Rp. 5,412.00
= Rp. 20,592.00
= Rp. 20,590.00

= Rp. 6,072.00
= Rp. 7,560.00
= Rp. 13,632.00
= Rp. 1,680.00
= Rp. 3,150.00
= Rp. 357.00
= Rp. 225.00
= Rp. 5,412.00
= Rp. 19,044.00
= Rp. 19,040.00

= Rp. 6,072.00
= Rp. 12,582.00
= Rp. 18,654.00
= Rp. 1,680.00
= Rp. 3,150.00
= Rp. 357.00
= Rp. 225.00
= Rp. 5,412.00
= Rp. 24,066.00
= Rp. 24,060.00

= Rp. 3,818.00
= Rp. 193.00
= Rp. 4,011.00
= Rp. 1,200.00
= Rp. 15,000.00
= Rp. 1,700.00
= Rp. 225.00
= Rp. 18,125.00
= Rp. 22,136.00
= Rp. 22,130.00
= Rp. 5,375.00
= Rp. 193.00
= Rp. 5,568.00
= Rp. 1,200.00
= Rp. 15,000.00
= Rp. 1,700.00
= Rp. 225.00
= Rp. 18,125.00
= Rp. 23,693.00
= Rp. 23,690.00

= Rp. 2,817.50
= Rp. 7,050.00
= Rp. 14,100.00
= Rp. 23,967.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 30,653.00
= Rp. 30,650.00

= Rp. 2,817.50
= Rp. 10,000.00
= Rp. 20,000.00
= Rp. 32,817.50
= Rp. 1,200.00
= Rp. 4,725.00
= Rp. 535.50
= Rp. 225.00
= Rp. 6,685.50
= Rp. 39,503.00
= Rp. 39,500.00
= Rp. 63,630.00
= Rp. 7,500.00
= Rp. 71,130.00
= Rp. 15,000.00
= Rp. 35,000.00
= Rp. 4,500.00
= Rp. 117.00
= Rp. 54,617.00
= Rp. 125,747.00
= Rp. 125,740.00

= Rp. 77,467.00
= Rp. 7,500.00
= Rp. 84,967.00
= Rp. 15,000.00
= Rp. 35,000.00
= Rp. 4,500.00
= Rp. 117.00
= Rp. 54,617.00
= Rp. 139,584.00
= Rp. 139,580.00

= Rp. 46,600.00
= Rp. 18,000.00
= Rp. 64,600.00
= Rp. 30,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 2,250.00
= Rp. 52,000.00
= Rp. 116,600.00
= Rp. 116,600.00

= Rp. 66,450.00
= Rp. 18,000.00
= Rp. 84,450.00
= Rp. 30,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 2,250.00
= Rp. 52,000.00
= Rp. 136,450.00
= Rp. 136,450.00

= Rp. 155,190.00
= Rp. 18,000.00
= Rp. 173,190.00
= Rp. 30,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 2,250.00
= Rp. 52,000.00
= Rp. 225,190.00
= Rp. 225,190.00

= Rp. 122,500.00
= Rp. 18,000.00
= Rp. 140,500.00
= Rp. 30,000.00
= Rp. 17,500.00
= Rp. 2,250.00
= Rp. 2,250.00
= Rp. 52,000.00
= Rp. 192,500.00
= Rp. 192,500.00

= Rp. 52,320.00
= Rp. 2,331.00
= Rp. 2,740.00
= Rp. 57,391.00
= Rp. 3,600.00
= Rp. 1,400.00
= Rp. 180.00
= Rp. 270.00
= Rp. 5,450.00
= Rp. 62,841.00
= Rp. 62,840.00
g termasuk penyediaan batu dan kawat brojong untuk

= Rp. 501,250.00
= Rp. 501,250.00
= Rp. 150,000.00
= Rp. 96,000.00
= Rp. 7,200.00
= Rp. 253,200.00
= Rp. 360,300.00
= Rp. 270,000.00
= Rp. 6,750.00
= Rp. 637,050.00
= Rp. 1,391,500.00
= Rp. 463,833.33
= Rp. 463,830.00
g termasuk penyediaan batu dan kawat brojong untuk

= Rp. 621,250.00
= Rp. 621,250.00
= Rp. 165,000.00
= Rp. 108,000.00
= Rp. 7,200.00
= Rp. 280,200.00
= Rp. 360,300.00
= Rp. 270,000.00
= Rp. 6,750.00
= Rp. 637,050.00
= Rp. 1,538,500.00
= Rp. 512,833.33
= Rp. 512,830.00

= Rp. 216,180.00
= Rp. 86,616.00
= Rp. 245,000.00
= Rp. 547,796.00
= Rp. 45,000.00
= Rp. 22,500.00
= Rp. 5,400.00
= Rp. 1,350.00
= Rp. 74,250.00
= Rp. 622,046.00
= Rp. 622,040.00

= Rp. 216,180.00
= Rp. 153,984.00
= Rp. 353,000.00
= Rp. 723,164.00
= Rp. 51,000.00
= Rp. 22,500.00
= Rp. 5,400.00
= Rp. 1,350.00
= Rp. 80,250.00
= Rp. 803,414.00
= Rp. 803,410.00
= Rp. 216,180.00
= Rp. 240,600.00
= Rp. 353,000.00
= Rp. 809,780.00
= Rp. 57,000.00
= Rp. 22,500.00
= Rp. 5,400.00
= Rp. 1,350.00
= Rp. 86,250.00
= Rp. 896,030.00
= Rp. 896,030.00
= Rp. 195,000.00

= Rp. 195,000.00
= Rp. 83,450.00
= Rp. 83,450.00
= Rp. 278,450.00
= Rp. 278,450.00

= Rp. 309,750.00

= Rp. 309,750.00
= Rp. 83,450.00
= Rp. 83,450.00
= Rp. 393,200.00
= Rp. 393,200.00

= Rp. 141,000.00
= Rp. 141,000.00
= Rp. 64,150.00
= Rp. 64,150.00
= Rp. 205,150.00
= Rp. 205,150.00

= Rp. 196,950.00
= Rp. 4,571.25
= Rp. 201,521.25
= Rp. 1,500.00
= Rp. 900.00
= Rp. 2,500.00
= Rp. 2,000.00
= Rp. 6,900.00
= Rp. 7,286.25
= Rp. 62,500.00
= Rp. 1,007.50

= Rp. 70,793.75
= Rp. 279,215.00
= Rp. 279,210.00
KERJAAN RIP/RAP BATU GUNUNG (MEKANIS)

= Rp. 144,120.00
= Rp. 144,120.00
= Rp. 29,145.00
= Rp. 29,145.00
= Rp. 173,265.00
= Rp. 173,260.00

= Rp. 240,000.00
= Rp. 36,000.00
= Rp. 276,000.00
= Rp. 276,000.00

= Rp. 120,000.00
= Rp. 9,000.00
= Rp. 129,000.00
= Rp. 129,000.00

= Rp. 60,000.00
= Rp. 22,500.00
= Rp. 2,250.00
= Rp. 4,500.00
= Rp. 89,250.00
= Rp. 89,250.00

= Rp. 77,625.00
= Rp. 3,500.00
= Rp. 71,790.01
= Rp. 37,200.00
= Rp. 190,115.01
= Rp. 30,000.00
= Rp. 45,000.00
= Rp. 4,500.00
= Rp. 900.00
= Rp. 80,400.00
= Rp. 270,515.01
= Rp. 270,510.00

= Rp. 25,875.00
= Rp. 6,468.75
= Rp. 32,343.75
= Rp. 21,000.00
= Rp. 26,250.00
= Rp. 2,800.00
= Rp. 1,620.00
= Rp. 51,670.00
= Rp. 84,013.75
= Rp. 84,010.00

= Rp. 22,640.63
= Rp. 2,213.75
= Rp. 24,854.38
= Rp. 15,000.00
= Rp. 18,750.00
= Rp. 2,000.00
= Rp. 1,170.00
= Rp. 36,920.00
= Rp. 61,774.38
= Rp. 61,770.00

= Rp. 47,030.21
= Rp. 3,018.75
= Rp. 48,461.00
= Rp. 98,509.96
= Rp. 9,000.00
= Rp. 33,750.00
= Rp. 3,600.00
= Rp. 720.00
= Rp. 47,070.00
= Rp. 145,579.96
= Rp. 145,570.00

= Rp. 47,030.21
= Rp. 3,018.75
= Rp. 82,828.75
= Rp. 132,877.71
= Rp. 9,000.00
= Rp. 33,750.00
= Rp. 3,600.00
= Rp. 720.00
= Rp. 47,070.00
= Rp. 179,947.71
= Rp. 179,940.00
= Rp. 57,020.83
= Rp. 16,291.67
= Rp. 73,312.50
= Rp. 15,000.00
= Rp. 18,750.00
= Rp. 2,000.00
= Rp. 1,170.00
= Rp. 36,920.00
= Rp. 110,232.50
= Rp. 110,230.00

= Rp. 50,647.92
= Rp. 2,213.75
= Rp. 52,861.67
= Rp. 15,000.00
= Rp. 18,750.00
= Rp. 2,000.00
= Rp. 1,170.00
= Rp. 36,920.00
= Rp. 89,781.67
= Rp. 89,780.00

= Rp. 180,000.00
= Rp. 180,000.00
= Rp. 180,000.00

= Rp. 180,000.00
= Rp. 180,000.00
= Rp. 180,000.00

= Rp. 15,000.00
= Rp. 4,500.00
= Rp. 19,500.00
= Rp. 19,500.00

= Rp. 180,000.00
= Rp. 31,500.00
= Rp. 211,500.00
= Rp. 211,500.00

= Rp. 15,000.00
= Rp. 2,250.00
= Rp. 17,250.00
= Rp. 17,250.00

= Rp. 1,253,750.00
= Rp. 193.00
= Rp. 1,253,943.00
= Rp. 9,000.00
= Rp. 112,500.00
= Rp. 12,750.00
= Rp. 6,750.00
= Rp. 141,000.00
= Rp. 1,394,943.00
= Rp. 92,996.20
= Rp. 92,990.00

Banyuwangi, Februari 2017

KEPALA DINAS PEKERJAAN UMUM


BINA MARGA, CIPTA KARYA DAN TATA RUANG
KABUPATEN BANYUWANGI

NIP. 19660915 199602 1 002


66 Lampu SELANG mtr
67 Lampu TL 1 x 40 Philips Buah
68 Lampu TL 20 W/220 V Komplit balas,kaca (phi Set
69 Lampu TL 40 W/220 V Komplit balas,kaca (phi Set
70 MCB 60 A Buah
71 MCB 60 A - SN 65 Buah
72 MCB 80 A Buah
73 MCB 80 A - SN 80 Buah
74 MCB 10A 1 PHASE ( MERLIN GERIN ) Pcs
75 MCB 10A 3 PHASE ( MERLIN GERIN ) Pcs
76 MCB 16A 1 PHASE ( MERLIN GERIN ) Pcs
77 MCB 16A 3 PHASE ( MERLIN GERIN ) Pcs
78 MCB 20A 1 PHASE ( MERLIN GERIN ) Pcs
79 MCB 20A 3 PHASE, ( MERLIN GERIN ) Pcs
80 MCB 25A 1 PHASE ( MERLIN GERIN ) Pcs
81 MCB 25A 3 PHASE ( MERLIN GERIN ) Pcs
82 MCB 32A 1 PHASE ( MERLIN GERIN ) Pcs
83 MCB 32A 3 PHASE ( MERLIN GERIN ) Pcs
84 MCB 40A 1 PHASE ( MERLIN GERIN ) Pcs
85 MCB 40A 3 PHASE ( MERLIN GERIN ) Pcs
86 MCB 4A 1 PHASE ( MERLIN GERIN ) Pcs
87 MCB 6A 1 PHASE ( MERLIN GERIN ) Pcs
88 Piting Mercury Buah
89 Pitingan TL 40 watt Buah
90 Plendes Stel
91 Relay 15 A Buah
92 Sekering kas lokal 1 group Buah
93 Sekering kas lokal 2 group Buah
94 Sekering kas lokal 3 group Buah
95 Servis Kabel Buah
96 Skakelar (Broco) Engkel Buah
97 Skakelar / Handel Buah
98 Skakelar broco seri Buah
99 SON - H 220 W PHILIPS Pcs
100 SON - H 350 W PHILIPS Pcs
101 SON - T 150 W PHILIPS Pcs
102 SON - T 250 W PHILIPS Pcs
103 SON - T 400 W PHILIPS Pcs
104 SON - T 70 W PHILIPS Pcs
105 SON 150 W (LU150/100/D/E/40), GE Pcs
106 SON 150 W, PHILIPS Pcs
107 SON 250 W (250/D/E/40), GE Pcs
108 SON 250 W, PHILIPS Pcs
109 SON 400 W (LU400//D/E/40), GE Pcs
110 SON 400 W, PHILIPS Pcs
111 SON 70 W (LU70/90/D/E/27), GE Pcs
112 SON 70 W, PHILIPS Pcs
113 SON-T 150 W (LU150/100/T/E/40), GE Pcs
114 SON-T 250 W (LU250/T/E/40), GE Pcs
115 SON-T 400 W (LU400/T/E/40), GE Pcs
116 SON-T 70 W (LU70/90/T/12/E/27), GE Pcs
117 Stater TL 40 watt Buah
118 Stop Kontak (Broco) Buah
119 Stop kontak + Instalasi Buah
120 Tabung TL 40 watt (Philips) Buah
121 Tabung TL 40 watt (Tens) Buah
122 Titik Lampu + Instalasi TL 1 x 40 watt Buah
123 Trafo 250 watt Buah
124 Trafo 40 watt sinar Buah
125 Trafo 40 watt Tens Buah
126 Trafo 400 watt Buah
127 Trafo mercury 125 watt Buah
128 WD Kap TL 40 watt khusus LPJU Buah
129 Yogo Buah
130 Sewa Truck Crane Unit/Hari
131 Sewa Alat bantu penerangan jalan umum Jam
132 Sewa alat bantu Roll pipa Roll/Jam
133 Sewa mesin bor u/ pemasangan kabel bawah Unit/Hari
134 Pemasangan dan penarikan kabel m
135 Roll pipa 2" Unit
136 Roll pipa 3" Unit
137 Roll pipa 4" Unit
138 Pembuatan dan Pemasangan terminal dlm ti Unit
139 Baut Baja ( Ring + mur ) stel
140 Kotak meter / Box panel Buah
141 Lampu mL-10 watt ( Lampu LHE) Lengkap Set
142 mC 25 Ampere Buah
143 PerakitanLampu Pertiang Unit
144 Tarikan kabel/Service Buah
145 Tiem Switch Unit
146 Terminal Kabel WK 25 mm Buah
147 Time Switch / Photocell Unit
148 Kawat seling m
149 Upah tarikan kabel m
150 Tiang oktagonal 8 m' Singgle orn Hot dipped Batang
151 Tiang oktagonal 8 m' Double orn Hot dipped Batang
152 Tiang oktagonal 7 m' Singgle orn Hot dipped Batang
153 Lampu HPS 250 watt ( Lampu HE ) lengkap Unit
154 Lampu HPS 250 watt ( Lampu HE ) lengkap S Unit
155 Grounding Set
156 SON H 250 Watt meter
157 Dop merkury ml 100 watt Buah
158 Dop merkury ml 250 watt Buah
159 Dop merkury ml 500 watt Buah
160 Son T 250 Buah
161 Esensial 23 watt Buah
162 Travo 250 Watt mercury Buah
163 Travo 40 Watt Buah
164 mC 50 A Buah
165 Fitingan mercury 250 Watt Buah
166 WD Kap Lampu 40 Watt Khusus LPJU Buah
167 TDL 36 Watt Buah
168 Starter S-20 Buah
169 MCB 20 A Buah
170 MCB 25 A Buah
171 MCB 32 A Buah
172 Konektor Kabel Buah
173 Kapasitor 25 UF 250 V Buah
174 Ignitor SN 58 Buah
175 Time Switch Buah
XVIII. STANDAR BAHAN DAN UPAH

RAB HARGA SURVEY


NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
A Bahan Pembangunan
Amplas ukuran 9x11 merk brite Lembar 5,350 5,100 255 5,355
Amplas ukuran 9x11 merk nikken Lembar 6,400 6,100 305 6,405
ukuran 9x11 merk Flying
Amplas Lembar 4,400 4,200 210 4,410
ukuran 9x11
whell
merk Three
Amplas Lembar 3,350 3,200 160 3,360
star
Amplas ukuran 9x11 merk Duco Lembar 4,050 3,900 195 4,095
Amplas ukuran 9x11 merk 3M Lembar 7,950 7,600 380 7,980
Amplas 450 1M 9,600 8,000 1,600 9,600

B Kuas
Kuas Uk 1" RRT Buah 3,550 3,400 170 3,570
Kuas Uk 1,5" RRT Buah 5,350 5,100 255 5,355
Kuas Uk 2" RRT Buah 6,900 6,600 330 6,930
Kuas Uk 2,5" RRT Buah 8,800 8,400 420 8,820
Kuas Uk 3" RRT Buah 10,500 10,000 500 10,500
Kuas Uk 4" RRT Buah 19,300 18,400 920 19,320
Kuas Uk 5" RRT Buah 28,350 27,000 1,350 28,350

C Baut
Mur Baut 10x70 Buah 9,850 9,400 470 9,870
Palu Amer Ukuran Sedang Buah 107,800 102,700 5,135 107,835
Palu Konde Buah 43,150 41,100 2,055 43,155

D ONGKOS / UPAH KERJA


1 Kepala Tukang Batu oh(7jam) 90,000 80,000 70,000
2 Tukang Batu oh(7jam) 70,000 70,000 75,000
2 Pembantu Tukang Batu oh(7jam) 60,000 60,000 60,000
3 Kepala Tukang kayu oh(7jam) 90,000 50,000 100,000
3 Tukang Kayu oh(7jam) 90,000 45,000 95,000
4 Kepala Tukang Cat oh(7jam) 85,000 80,000 85,000
5 Tukang Cat oh(7jam) 75,000 65,000 80,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
7 Kepala Tukang Besi oh(7jam) 80,000 60,000 85,000
7 Tukang Besi oh(7jam) 75,000 50,000 80,000
8 Mandor Lapangan oh(7jam) 90,000 90,000 60,000
9 Juru ukur oh(7jam) 100,000 50,000
10 Mekanik Terampil oh(7jam) 110,000 110,000 50,000
11 Operator terampil oh(7jam) 100,000 100,000 70,000
11 Pembantu operator oh(7jam) 60,000 60,000 73,400
12 Penganyam bronjong oh(7jam) 75,000 60,000 80,000
12 Penjaga malam oh(7jam) 50,000 70,000
13 Sopir personil oh(7jam) 105,000 105,000 100,000
13 Logistik oh(7jam) 110,000 97,800
14 Site manager oh 150,000 42,200
14 Geologis oh 45,000 45,000
17 Tukang las o/h 80,000 97,800 90,000
18 Kepala Tukang Las o/h 90,000 138,900 95,000
19 Tukang Pelitur o/h 80,000 194,300 85,000
20 Kepala Tukang Pelitur o/h 85,000 55,000 90,000
21 Tukang Bor o/h 75,000 70,000
22 Kepala Tukang Bor o/h 90,000 50,000
23 Tukang Listrik o/h 90,000 50,000 85,000
24 Penggalian Lubang lubang 2,500 50,000
25 Tukang pipa o/h 70,000 60,000 70,000
26 Kepala Tukang Pipa o/h 80,000 50,000 80,000
27 Pembantu Mekanik o/h 60,000 60,000 60,000
28 Pembantu Sopir o/h 60,000 60,000 50,000
29 Pekerja o/h 60,000 52,500 60,000

E BAHAN PASANGAN
1 Aspal 155 kg / drum Kg 10,255
2 Aspal Curah Kg 10,000
3 Aspal Emulsi Kg 8,785
4 Batu Andesit Polos 10/20 M10 m² 186,550
5 Batu Andesit Polos 15/30 M31 m² 209,000
6 Batu Andesit Polos 20/40 m² 209,000 8,800 440 9,240
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
7 Batu Andesit Ulir 10/20 m² 264,000 8,700 435 9,135
8 Batu Andesit Ulir 15/30 m² 264,000 7,700 385 8,085
9 Batu Andesit Ulir 20/40 m² 264,000 8,625 431 9,056
10 Batu bata merah Buah 750 575
11 Batu Candi Polos 10/20 m² 149,000 7,475 374 7,849
12 Batu Candi Polos 15/30 m² 149,000 9,310 466 9,776
13 Batu Candi Polos 20/40 m² 149,000 118,100 5,905 124,005
14 Batu Candi Ulir 10/20 m² 209,000 94,500 4,725 99,225
15 Batu Candi Ulir 15/30 m² 209,000 92,100 4,605 96,705
16 Batu Candi Ulir 20/40 m² 209,000 92,100 4,605 96,705
17 Batu gunung m3 105,000 91,500 270,000 54,000 324,000
18 Batu pecah 1 - 2 (mesin) m3 300,000 75,000 15,000 90,000 250,000
19 Batu pecah 2 - 3 (mesin) m3 275,000 65,000 13,000 78,000 225,000
20 Batu pecah 3 - 5 m3 260,000 60,000 12,000 72,000 200,000
21 Batu pecah 5 - 7 m3 250,000 244,000 177,700 8,885 186,585 200,000
22 Batu Belah 15/20 m3 120,100 105,000 177,700 8,885 186,585 140,000
23 Filler / abu batu kg 600 525 177,700 8,885 186,585
24 Kapur gamping Ton 734,350 177,700 8,885 186,585
25 Kapur pasang m3 409,600 356,500 177,700 8,885 186,585
26 Kawat bronjong galvanis Kg 24,850 177,700 8,885 186,585
27 Minyak pelumas meditran S. 40 Liter 34,000 400 20 420
28 Minyak pelumas mesran B. 40 Liter 34,000 29,500 60,000 12,000 72,000
29 Minyak Roled HD 90.140 Liter 69,000 70,000 14,000 84,000
30 Minyak tanah / Kerosin Liter 70,000 14,000 84,000
31 Olie Hidrolis Toralix 52 Liter 71,500 110,000 22,000 132,000 25,000
32 Pasir beton m³ 200,000 174,000 150,000 30,000 180,000 160,000
33 Pasir pasang m³ 185,000 160,000 94,500 4,725 99,225 150,000
34 Pasir urug m³ 150,000 130,500 105,500 5,275 110,775 130,000
35 Premium Liter 105,500 5,275 110,775
36 Sirtu m³ 129,000 112,500 149,900 7,495 157,395
37 Solar Liter 8,500 166,600 8,330 174,930
38 Semen Bosowa 50 Kg Zak 62,875 177,700 8,885 186,585 53,500
39 Semen Gresik 40 kg/zak (m. 080) Zak 56,350 75,000 15,000 90,000 59,000
40 Semen Tiga Roda 40 Kg Zak 53,475 100,000 5,000 105,000 56,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
41 Semen Warna Kg 12,650 281,000 14,050 295,050 88,000
42 Tanah urug m³ 93,000 81,000 256,500 12,825 269,325 70,000
43 Urugan Pilihan m³ 108,000 94,000 244,300 12,215 256,515
47 Batu Krikil M3 141,750 219,900 10,995 230,895
48 Batu Marmer M2 315,000 114,400 5,720 120,120
50 Batako 36 x 20 x 10 biji 3,700 4,000
51 Koral Sikat zak 80,500 75,000
52 Bata Ringan (Exterior) 60x20x10 biji 13,340 12,000
53 Bata Ringan (Interior) 60x20x7.5 biji 10,350 135,000 6,750 141,750 9,000
54 Batu Raen m3 316,000 300,000 15,000 315,000
55 Tasirtu (timbunan biasa) m3 108,000 425,000 85,000 510,000
56 Semen PC kg 1,370 1,250
57 Batu Pecah kg 259
58 Tanah Isian kg 127,850 600,000 120,000 720,000
59 Pertamax Liter 8,050 2,500 500 3,000

F BAHAN PASANGAN LAINNYA 200,000 40,000 240,000


1 Biaya pasang Geo membrane Kg 10,120 166,300 8,315 174,615
Geotekstil
Geomembran
2 Versicel m2 300,000 275,000

G ALAT BANTU 94,500 4,725 99,225


1 Sewa Mollen beton Unit / Hr 138,000 92,100 4,605 96,705 268,100
2 Sewa Pesawat ukur Unit/Hari 207,000
3 Sewa Excavator Unit / Jam 276,000 699,400 34,970 734,370 172,248
4 Trucuk/bambu (3 m) Buah 14,375 13,500 390,100 19,505 409,605
5 Sewa Vibrator beton Unit/Hari 94,300 23,700 1,185 24,885
6 Sewa scafolding Unit/Hari 17,250 245,600 12,280 257,880
7 Sewa Mesin Poles/Slep Unit/Hari 33,607 32,400 1,620 34,020
8 Sewa Buldozer Unit/jam 193,200 32,400 1,620 34,020 199,436
9 Sewa Dumptruck Unit/jam 402,500 31,800 1,590 33,390 131,467
10 Sewa Jack Hammer unit/hari 196,318 55,209
11 Sewa Pompa Beton Standar unit/hari 4,312,500 4,000,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
12 Sewa Pompa Beton Longbow unit/hari 5,462,500 5,500,000
H BAHAN LISTRIK 34,200 1,710 35,910
1 Asesoris Ornamaen Buah 180,000 122,800 6,140 128,940
2 Baut Stenlis 7/16 Buah 21,000 122,800 6,140 128,940
3 Begel Stel 36,000 129,000 6,450 135,450
4 Dop mercury 125 watt Philips Buah 75,000
5 Dop mercury 250 watt Philips Buah 120,000 77,800 3,890 81,690
6 Dop mercury 400 watt Philips Buah 170,000 165,000 33,000 198,000
7 Dop Natrium 250 watt Philips Buah 300,000 125,000 25,000 150,000
8 Dop Natrium 400 watt Philips Buah 375,000 250,000 50,000 300,000
19 Lampu TL 1 x 40 Philips Buah 80,000 43,400 2,170 45,570
Lampu TL 20 W/220 V Komplit
20 Set 95,000 54,500 2,725 57,225
balas,kaca (philips)
Lampu TL 40 W/220 V Komplit
21 Set 120,000 60,000 3,000 63,000
balas,kaca (philips)
Downlight LED bh
Uplight LED bh
LED panel bh
Ledstrip bh
TL LED bh
Spotlight bh
Spot downlight LED bh

22 Skakelar (Broco) Engkel Buah 25,000 60,000 3,000 63,000


23 Skakelar / Handel Buah 90,000 64,000 3,200 67,200
24 Skakelar broco seri Buah 15,000 55,000 2,750 57,750
25 Stop Kontak (Broco) Buah 25,000 62,000 12,400 74,400
26 Instalasi Stop kontak Buah 130,000 58,000 2,900 60,900
27 Tabung TL 40 watt (Philips) Buah 70,000 46,000 2,300 48,300
28 Tabung TL 40 watt (Tens) Buah 60,000 63,000 3,150 66,150
29 Instalasi Titik Lampu Buah 130,000 63,000 12,600 75,600
30 Esensial 23 watt Buah 39,100 95,000 19,000 114,000
BAHAN PENGGANTUNG
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Door Closer Buah 172,500 49,000 9,800 58,800 245000-300000
Door Holder Buah 46,000 60,000 12,000 72,000 100000-400000
Door Stop Buah 51,750 62,000 12,400 74,400 50000-75000
Engsel angin Buah 15,525 90,000 18,000 108,000 17,000
Engsel jendela Aluminium stenlees Buah 23,575 1,250,000 250,000 1,500,000 20,000
Engsel pintu Aluminium Unit 47,725 74,500 3,725 78,225
Engsel Pintu 4 " Buah 15,525 77,800 3,890 81,690 40,000
Engsel jendela 3" Buah 7,763 33,000
Grendel Jendela Buah 18,975 15,000
Gembok Bj 6,900 8,800 440 9,240
Grendel jendela Aluminium biasa Buah 24,725 7,700 385 8,085 20,000
Grendel jendela Aluminium mutu baik Unit 20,125 118,100 5,905 124,005 35,000
Grendel pintu vintage Set 32,583 94,500 4,725 99,225 20,000
Grendel tanam Buah 12,938 92,100 4,605 96,705 40,000
Kunci 2 x putar Buah 186,875 122,800 6,140 128,940
Kunci pintu Aluminium Buah 66,125 500 25 525 65,000
Samsung SHS-5421
Kunci Pintu Elektrik SMART DOOR LOCK + Unit 7,000,000 Bappeda
Biaya pemasangan
Kunci selot Buah 66,125 1,300 65 1,365 15,000
Kunci silinder Bj 57,500 27,100 1,355 28,455 50,000
Kunci tanam besar 2 x putar Bj 172,500 92,100 4,605 96,705 125000-250000
Pegangan pintu Buah 94,875 - -
BAHAN LANGIT-LANGIT
Asbes gelombang besar tebal 5 mm Lembar 126,500 16,700 835 17,535
Asbes wuwung gelombang besar tebal
Lembar 27,025 2,200 110 2,310
5 mm
Asbes wuwung gelombang kecil tebal
Lembar 25,875 31,000 1,550 32,550
4 mm
Eeternite Ex Kerang Lembar 16,100 43,300 2,165 45,465
Eternite Sakura Lembar 16,100 54,500 2,725 57,225
Genteng Kr. Pilang / Wisma Bj 5,175 66,600 3,330 69,930
Gypsum board 9 mm Lembar 96,313 9,400 470 9,870
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Hardplek 1 x 2 m Lembar 55,775 12,900 645 13,545
List gypsum besar m' 27,025 14,500 725 15,225
Nok Genteng Beton Bj 11,500 9,400 470 9,870
Plat asbes tebal 3,5 mm Lembar 19,550 11,200 560 11,760
Plat asbes tebal 4 mm Lembar 20,125 12,900 645 13,545
Plat asbes tebal 5 mm Lembar 29,900 333,200 16,660 349,860
Plywood tebal 4 mm Lembar 77,625 - -
Plywood tebal 6 mm Lembar 97,750 - -
Plywood tebal 9 mm Lembar 155,250 15,700 785 16,485
Seng BJLs 28/ 0,9 x 1,8 Lembar 83,375 900 45 945
Seng BJLs 20/ 0,9 x 1,8 Lembar 54,625 88,700 4,435 93,135
Seng BJLs 20/ 45 cm m' 16,100 10,100 505 10,605
Seng BJLs 30/ 60 cm m' 28,750 34,100 1,705 35,805
Teakwood tebal 4 mm (1,10 x 2,10) Lembar 112,125 54,600 2,730 57,330
Teakwood tebal 4 mm Lembar 123,625 22,900 1,145 24,045
Triplek tebal 3 mm (1,10 x 2,10) Lembar 62,100 10,800 540 11,340
Triplek tebal 3 mm (1,22 x 2,44) Lembar 62,675 314,100 15,705 329,805
Triplek tebal 4 mm (0,90 x 2,00) Lembar 74,175 9,900 495 10,395
Triplek tebal 4 mm (1,20 x 2,40) Lembar 74,750 32,400 1,620 34,020
Multiplek tebal 9 mm (1,22 x 2,44) Lembar 125,350 88,700 4,435 93,135
Kalsiboard 4 mm Lembar 56,350 127,900 6,395 134,295 49,000
Kalsiplank 9 mm Lembar 78,775 20,500 1,025 21,525 50,000
GRC ( 1,20 x 2,40 ) 9 mm Lembar 147,200
Serbuk Gypsum kg 1,438 6,100 305 6,405
Genteng Metal Roof + Insulin m2 92,000 196,800 9,840 206,640
Genteng Metal Roof 0.3 mm m2 97,750 37,900 1,895 39,795
Genteng Zincalume 0.3 mm m2 94,875 248,300 12,415 260,715
Nok Genteng Metal Roof bh m' 31,050
Nok Samping Metal Roof m' 33,350

BAHAN TEMPEL LANTAI DAN DINDING


Batu Lempeng m² 109,250 120,000
Tegel keramik 10 x 20 cm polos dos 67,050
Tegel keramik 20 x 20 cm motif platinum (25/dos) dos 61,500
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Tegel keramik 20 x 20 cm polos platinum (25/dos) dos 53,000 13,500 675 14,175
Tegel keramik 20 x 25 cm motif dos 60,000 10,100 505 10,605
Tegel keramik 20 x 25 cm polos dos 54,000 6,100 305 6,405
Tegel keramik 30 x 30 cm motif platinum (11/dos) dos 49,000 14,800 740 15,540 60,000
Tegel keramik 30 x 30 cm polos platinum (11/dos) dos 47,000 88,700 4,435 93,135 55,000
Tegel keramik 40 x 40 cm motif supermilan dos 56,800 - - 75,000
Tegel keramik 40 x 40 cm polos supermilan dos 52,350 - - 70,000
Tegel keramik 50 x 50 cm motif platinum (4/dos) dos 69,000
Tegel keramik 50 x 50 cm polos platinum (4/dos) dos 69,000
Tegel keramik 60 x 60 cm motif dos 94,645 75,000
Tegel keramik 60 x 60 cm polos dos 94,645 70,000
Keramik Dinding 25 x 40 dos 62,975 196,600 9,830 206,430 66,000
Keramik Dinding 25 x 50 dos 101,200 92,000
Keramik Dinding 30 x 60 dos 109,250 62,500
Granite Tile 60 x 60 dos 239,050 23,100 1,155 24,255 165,000
Granite Tile 30 x 60 dos 262,350 39,400 1,970 41,370 160,000
Lis Lantai mtr 70,200 78,600 3,930 82,530
Stepnosing m' 45,000 123,500 6,175 129,675 35,000
Paving 21.0 x 10.5 x 6.0 mutu K 200 m2 51,900 174,100 8,705 182,805 50,500
Paving 21.0 x 10.5 x 6.0 mutu K 225 m2 54,000 325,700 16,285 341,985 52,500
Paving 21.0 x 10.5 x 6.0 mutu K 250 m2 56,400 387,500 19,375 406,875 54,500
Paving 21.0 x 10.5 x 6.0 mutu K 275 m2 60,000 25,300 1,265 26,565 58,000
Paving 21.0 x 10.5 x 6.0 mutu K 300 m2 63,000 26,600 1,330 27,930 60,900
Paving 21.0 x 10.5 x 6.0 mutu K 175
m2 73,200 31,400 1,570 32,970 70,500
warna
Paving 21.0 x 10.5 x 6.0 mutu K 200
m2 76,700 28,700 1,435 30,135 73,000
warna
Uskup Tbl 6.0 mutu K 200 bh 4,200 32,800 1,640 34,440 4,000
Uskup Tbl 6.0 mutu K 225 bh 4,300 34,800 1,740 36,540 4,200
Uskup Tbl 6.0 mutu K 250 bh 4,600 25,300 1,265 26,565 4,300
Uskup Tbl 6.0 mutu K 275 bh 4,700 19,100 955 20,055 4,500
Uskup Tbl 6.0 mutu K 300 bh 4,900 24,700 1,235 25,935 4,600
Kanstin 40 x 30 x 10 K 250 bh 22,600 23,900 1,195 25,095 21,500
Kanstin 40 x 30 x 10 K 275 bh 24,000 140,300 7,015 147,315 23,000
Kanstin 40 x 30 x 10 K 300 bh 25,400 12,900 645 13,545 24,500
Kanstin 40 x 20 x 10 K 250 bh 19,400 19,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Kanstin 40 x 20 x 10 K 275 bh 20,500 20,000
Kanstin 40 x 20 x 10 K 300 bh 21,800 103,900 5,195 109,095 21,000
Granite Tile 60 x 60 Ex. Granito M2 dos 483,575 97,600 4,880 102,480 296,000
Granite Tile 30 x 60 Ex. Granito M2 449,075
Kuku Macan m' 9,200 51,800 2,590 54,390 15,000
BAHAN SANITAIR 112,400 5,620 118,020
Afour Buah 38,600 73,100 3,655 76,755 75000-100000
Bak air (tandon) Fibre kapasitas 550
Buah 770,500 126,000 6,300 132,300 600,000
m3
Bak cuci piring logam 100 Buah 287,500 8,800 440 9,240 275,000
Bak cuci piring logam 80 Buah 258,750 464,400 23,220 487,620 175,000
Floor drain Buah 175,375 184,500 9,225 193,725 8,000
Klosed duduk putih porselen komplit Buah 1,380,000 296,400 14,820 311,220 1150000-1250000
Klosed jongkok keramik (Ina) muda Buah 161,000 296,400 14,820 311,220 150,000
Klosed jongkok keramik (Ina) tua Buah 181,125 778,600 38,930 817,530 185,000
Kran biasa Buah 21,500 1,181,500 59,075 1,240,575 20000-24000
Pipa / slang spiral saluran kran Set 71,600 853,600 42,680 896,280 60,000
Seal Tape Buah 2,700 1,755,200 87,760 1,842,960 3,000
Urinoir Buah 1,725,000 618,700 30,935 649,635 1,700,000
Wastafel keramik (Ina) tua Buah 425,000 7,900 395 8,295 300000-700000
Kran Sedang Buah 52,350 9,700 485 10,185 65000-95000
Double Kran Buah 291,450 8,200 410 8,610 150000-270000
Klosed Duduk Standart unit 707,250 139,500 6,975 146,475 2,300,000
Klosed Duduk Non Standart unit 8,970,000 326,500 16,325 342,825 6000000-12000000
Shower kloset biasa bh 85,000 1,292,400 64,620 1,357,020 70000-120000
BAHAN PAKU 1,235,400 61,770 1,297,170
Paku asbes Buah 500 22,300 1,115 23,415
Paku beton besar Biji 575 16,200 810 17,010
Paku beton kecil Kg 12,650 190,400 9,520 199,920
Paku dur 5" Kg 8,450 112,700 5,635 118,335
Paku eternite Kg 23,750 73,100 3,655 76,755
Paku payung Kg 20,500 376,200 18,810 395,010
Paku reng 2" Kg 11,875 4,700 235 4,935
Paku seng Kg 23,450 3,400 170 3,570
Paku skrup Dos 20,125 6,300 315 6,615
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Paku skrup 0,5" Dos 8,500 4,800 240 5,040
Paku skrup 1" Biji 150 4,900 245 5,145
Paku triplek Dos 12,075 3,700 185 3,885
Paku usuk 4" Kg 14,000 6,700 335 7,035
BAHAN KAYU 12,600 630 13,230
Acuan Kayu Begisting m³ 3,090,150 2,690,000 4,900 245 5,145
Kayu Ulin (Balok) m³ 17,000,000 3,900 195 4,095
Kayu Ulin (Papan) m³ 17,500,000 7,900 395 8,295
BAHAN KACA 4,900 245 5,145
Kaca es tebal 3 mm m² 103,500 4,200 210 4,410
Kaca es tebal 5 mm m² 172,500 16,300 815 17,115
Kaca naco Lembar 7,550 83,200 4,160 87,360
Kaca polos tebal 5 mm m² 86,050 107,900 5,395 113,295 80,000
Kaca rayban tebal 5 mm m² 108,175 125,900 6,295 132,195 95,000
Kaca Flat Tempered 5mm M² 223,000 663,000 33,150 696,150
Kaca Flat Tempered 6mm M² 390,000 1,538,300 76,915 1,615,215
Kaca Flat Tempered 8mm M² 390,000 729,400 36,470 765,870
Kaca Flat Tempered 10mm M² 950,000 2,068,600 103,430 2,172,030
Kaca Flat Tempered 12mm M² 1,425,000 45,900 2,295 48,195
Kaca Flat Tempered 15mm M² 3,500,000 208,300 10,415 218,715
Kaca Curved Tempered 5mm M² 332,000 45,900 2,295 48,195
Kaca Curved Tempered 6mm M² 372,000 239,300 11,965 251,265
Kaca Curved Tempered 8mm 497,500 45,900 2,295 48,195
Kaca Curved Tempered 10mm M² 637,000 211,700 10,585 222,285
Kaca Curved Tempered 12mm M² 1,550,000 52,600 2,630 55,230
Kaca Curved Tempered 15mm M² 3,500,000 225,300 11,265 236,565
56,100 2,805 58,905
I BAHAN PIPA 245,800 12,290 258,090
J PIPA AIR BERSIH 64,900 3,245 68,145
K PIPA SANITASI 252,700 12,635 265,335
Pipa PVC 1 1/2" AW Maspion m' 20,968 43,700 2,185 45,885
Pipa PVC 1 1/4" AW Maspion m' 16,215 45,900 2,295 48,195 5,250
Pipa PVC 1" AW Maspion m' 11,308 161,200 8,060 169,260 4,500
Pipa PVC 1/2" AW Maspion m' 7,188 7,900 395 8,295 3,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Pipa PVC 2 1/2 " AW Maspion m' 40,250 229,500 11,475 240,975
Pipa PVC 2" AW Maspion m' 31,050 131,100 6,555 137,655 12,000
Pipa PVC 3" AW Maspion m' 57,251 96,700 4,835 101,535 16,000
Pipa PVC 3/4" AW Maspion m' 9,100 139,600 6,980 146,580 4,500
Pipa PVC 4" AW Maspion m' 83,758 150,400 7,520 157,920 24,500
Pipa PVC 5" AW Maspion m' 123,625 3,200 160 3,360
Pipa PVC 6" AW Maspion m' 169,050 27,100 1,355 28,455
Pipa PVC 8" AW Maspion m' 257,000 96,700 4,835 101,535
Pipa PVC 10" AW Maspion m' 356,500 15,700 785 16,485
Kran air 3/4" Buah 22,050 355,100 17,755 372,855 18,000
Selang 5/8" m' 5,175 116,200 5,810 122,010
Springkle Buah 100,550 129,800 6,490 136,290
ASSESORIS PIPA 150,300 7,515 157,815
BAHAN BESI 115,900 5,795 121,695
BESI BETON (BB) 204,900 10,245 215,145
Bendrat/Kawat Ikat Beton Kg 14,050 12,300 109,300 5,465 114,765 12,000
Besi beton ulir Kg 10,500 199,200 9,960 209,160 7,198
Besi bulat st 60 Kg 19,780 129,800 6,490 136,290
Besi canal Kg 16,000 232,500 11,625 244,125
Besi Profil WF Kg 16,900 15,000 157,100 7,855 164,955 8,631
Besi siku Kg 12,700 159,500 7,975 167,475
Besi beton polos Kg 10,000 81,900 4,095 85,995 7,885
Besi Hollow 5 Cm x 5 Cm Tebal 1,8 mm Lonjor 123,000 204,900 10,245 215,145
Besi Hollow 4 Cm x 4 Cm Tebal 1,8 mm Lonjor 97,750 199,200 9,960 209,160
Besi Hollow 4 Cm x 2 Cm Tebal 1,2 mm Lonjor 63,250 232,500 11,625 244,125
Roling door Aluminium m² 445,625 159,500 7,975 167,475
Baja WF Jembatan (Finish galvanis) kg 32,775 5,200 260 5,460
Kusen Alumunium 4" (YKK) m' 138,000 27,100 1,355 28,455
Pintu swing silver + kaca polos 5 mm,
m2 1,293,750 38,000 1,900 39,900
floor hinge dorma BTS 84
Pintu swing coklat + kaca polos 5 mm,
m2 1,437,500 74,600 3,730 78,330
foor hinge dorma BTS 84
Pintu frameless ( tempered 12 mm
m2 1,900,000 64,800 3,240 68,040
polos) floor hinge dorma BTS 84
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Pintu frameless ( tempered 12 mm
m2 2,075,000 142,200 7,110 149,310
rayban) floor hinge dorma BTS 84
Pintu swing + kaca polos 5 mm m2 645,000 180,300 9,015 189,315
Jendela sliding silver ( 60 x 120) +
m2 635,000 37,700 1,885 39,585
kaca polos 5 mm
Jendela sliding coklat ( 60 x 120) +
m2 718,750 33,700 1,685 35,385
kaca polos 5 mm
Jendela casement silver ( 60 x 120) +
m2 595,000 222,600 11,130 233,730
kaca polos 5 mm
Jendela casement coklat ( 60 x 120) +
m2 550,000 122,900 6,145 129,045
kaca polos 5 mm
Powder coating aluminium berbagai
m2 23,000 78,600 3,930 82,530
warna
Hollow 2/4 - 4m plafond btg 25,875 3,100 155 3,255
Hollow 4/4 - 4m plafond btg 35,650 222,100 11,105 233,205
Galvalume C-080 btg 135,125
Galvalume C-075 6m btg 86,825 1,700 85 1,785
Galvalume reng 6m btg 39,300 15,800 790 16,590
Floor Hinge dekkson set 1,700,000 28,100 1,405 29,505
Patch Fitting dekkson bh 550,000 42,800 2,140 44,940
Shower Hinge dekkson set 700,000 116,700 5,835 122,535
Casement Handel dekkson bh 33,500 4,400 220 4,620
BAHAN KAWAT 166,600 8,330 174,930
Kawat Las Listrik Kg 30,475 392,300 19,615 411,915
RB Kawat Las Pak 75,000
Kawat harmonica m' 30,000 83,300 4,165 87,465
Kawat harmonika besar m 32,775 3,200 160 3,360
Kawat harmonika kecil m 23,000 607,100 30,355 637,455
Kawat nyamuk/kawat kasa Aluminium m' 27,025 6,100 305 6,405
Kawat nyamuk/kawat kasa biasa m' 20,125 1,700 85 1,785
BAHAN BETON CETAKAN 3,664,900 183,245 3,848,145
` Readymix B.0 m3 805,000 73,500 3,675 77,175
Beton Ready Mix K 125 m3 902,750 111,500 5,575 117,075
Beton Ready Mix K 175 m3 925,750 155,000 7,750 162,750
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Beton Ready Mix K 225 m3 943,000 195,900 9,795 205,695
Beton Ready Mix K 250 m3 954,500 38,000 1,900 39,900
Beton Ready Mix K 275 m3 966,000 196,500 9,825 206,325
Beton Ready Mix K 300 m3 977,500 41,500 2,075 43,575
Beton Ready Mix K 350 m3 1,023,500 738,000 36,900 774,900
Beton Ready Mix K 400 m3 1,069,500 179,600 8,980 188,580
Beton Ready Mix K 450 m3 1,115,500 86,500 4,325 90,825
Beton Ready Mix K 500 m3 1,173,000 32,600 1,630 34,230
BAHAN UNTUK PENGECATAN / BAHAN FINISHING 5,400 270 5,670
Cat kayu, besi merk Emco STD Kg 60,260 66,000 13,200 79,200
Cat menie (besi/kayu) sejenis cap
Kg 38,180 71,500 14,300 85,800
Pedang
Cat tembok Vinilek, Aviapaint (sejenis) Kg 50,600 65,400 3,270 68,670
Cat Hitam Dop Ltr 65,000
Thinner Ltr 21,000
Lem kayu Kg 28,750 61,200 3,060 64,260
milamin Liter 62,100 3,400 170 3,570
minyak cat / afduner Liter 23,000 8,200 410 8,610
Plamur besi Kg 40,250 139,500 6,975 146,475
Plamur kayu Kg 28,750 326,500 16,325 342,825
Plamur tembok Kg 28,175 1,292,400 64,620 1,357,020
Politur Liter 77,050 415,000 20,750 435,750 67,500
Sealand Tube 32,200 14,100 705 14,805
Vernis Liter 66,125 315,600 15,780 331,380
Cat marka kg 32,000 315,600 15,780 331,380
Cat Tembok Weather Coat - putih Interior ltr 70,500 810,100 40,505 850,605 63,500
Cat Tembok Weather Coat - putih Eksterior ltr 100,000 3,713,900 185,695 3,899,595 82,500
PEKERJAAN KONSTRUKSI IRIGASI 8,200 410 8,610
A. Bahan 18,600 930 19,530
Bambu Petung Batang 16,550 276,100 13,805 289,905
Ijuk Kg 19,800 111,000 5,550 116,550
B. Alat Bantu 393,100 19,655 412,755
LAIN LAIN 250,000 12,500 262,500
Roster Keramik 30/30 Buah 50,600 200,000 10,000 210,000
Batu tempel hitam m² 100,550 499,700 99,940 599,640
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Batu Gerinda Biji 11,500
Batu Serkel Biji 69,000
Grendel pintu Unit 40,250 - -
Gypsum board 9 mm merk Elephant
Lembar 95,450 155,800 31,160 186,960
uk. 1,20 x 2,40 m
Gypsum board 9 mm merk Indal uk.
Lembar 73,025
1,20 x 2,40 m
Pintu PVC lengkap Buah 273,125 900 45 945
Avour lantai stenllis Buah 50,313 100 5 105
Waterprofing Kg 50,150 154,643,800 7,732,190 162,375,990
mesin Pompa ( Jet Pump ) 300 W Unit 1,681,875 3,054,000 152,700 3,206,700 1,680,000
Pas. Bak Cuci Stenlist Buah 517,500 610,700 30,535 641,235
Hand Shower Buah 143,750 16,658,200 832,910 17,491,110
Kunci Pintu Solid Buah 210,833 388,700 19,435 408,135
Engsel Pintu Solid Stel 66,700 45,900 2,295 48,195
Grendel Tanam Solid Buah 115,000 639,600 31,980 671,580
Door Closer Solid Buah 143,750 2,776,400 138,820 2,915,220
Kran Leher Angsa Buah 92,000 1,943,500 97,175 2,040,675
Paku Sekrup 10 cm Biji 200 943,900 47,195 991,095
Polycarbonat 5 mm Twinlinte m² 110,000 277,600 13,880 291,480
Polycarbonat 10 mm Twinlinte m² 160,000 1,721,400 86,070 1,807,470
Solartuff m² 300,000 603,400 30,170 633,570

BAHAN LISTRIK (DATA DARI DINAS


L 499,700 24,985 524,685
KEBERSIHAN DAN PERTAMANAN)

4 Dop mercury 125 watt Philips Buah 82,500 78,600 3,930 82,530
5 Dop mercury 250 watt Philips Buah 129,650 123,500 6,175 129,675
6 Dop mercury 400 watt Philips Buah 182,800 174,100 8,705 182,805
7 Dop Natrium 250 watt Philips Buah 341,950 325,700 16,285 341,985
8 Dop Natrium 400 watt Philips Buah 406,850 387,500 19,375 406,875
9 ESENSIAL 13 W / DULUX EE OSRAm Pcs 32,000 25,300 1,265 26,565
10 ESENSIAL 14 W, PHILIPS PHILIPS Pcs 32,000 26,600 1,330 27,930
11 ESENSIAL 16 W / DULUX EE OSRAm Pcs 37,000 31,400 1,570 32,970
12 ESENSIAL 17 W / DULUX EE OSRAm Pcs 36,000 28,700 1,435 30,135
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
13 ESENSIAL 20 W / DULUX EE OSRAm Pcs 39,000 32,800 1,640 34,440
14 ESENSIAL 23 W / DULUX EE OSRAm Pcs 40,000 34,800 1,740 36,540
15 ESENSIAL 5 W / DULUXSTAR OSRAm Pcs 26,550 25,300 1,265 26,565
16 ESENSIAL 5 W, PHILIPS PHILIPS Pcs 20,050 19,100 955 20,055
17 ESENSIAL 8 W, PHILIPS PHILIPS Pcs 25,900 24,700 1,235 25,935
18 ESENSIAL 9 W / DULUXSTAR OSRAm Pcs 27,000 23,900 1,195 25,095
19 Foto relay 6 Ampere Buah 147,300 140,300 7,015 147,315
20 Isolasi band Buah 13,500 12,900 645 13,545
21 Kabel NYF GBY 4 x 10 m 149,500
22 Kabel NYF GBY 4 x 16 m 149,500
23 Kabel NYF GBY 4 x 2 1/2 m 109,050 103,900 5,195 109,095
24 Kabel NYF GBY 4 x 4 m 102,450 97,600 4,880 102,480
25 Kabel NYF GBY 4 x 6 m 54,350 51,800 2,590 54,390
26 Kabel PVC Roll 118,000 112,400 5,620 118,020
27 Kabel Tuistit 2 x 20 m 76,750 73,100 3,655 76,755
28 Kabel NYA 1000 volt 4 mm Roll 132,300 126,000 6,300 132,300
29 Kabel NYA 1000 volt 1,5 mm Roll 9,200 8,800 440 9,240
30 Kabel NYA 1000 volt 2,5 mm Roll 487,600 464,400 23,220 487,620
31 Kabel NYA 2,5 mm (LmK) Buah 193,700 184,500 9,225 193,725
32 Kabel NYA 2,5 mm x 2 (LmK) Roll 311,200 296,400 14,820 311,220
33 Kabel NYY 2 x 2,5 mm LmK Roll 311,200 296,400 14,820 311,220
34 Kabel NYY 2,5 x 2 mm Roll 817,500 778,600 38,930 817,530
35 Kabel NYY 4 x 2,5 mm Roll 1,240,550 1,181,500 59,075 1,240,575
Kabel NYY 1000 volt 1,5 mm (LmK)
36 Roll 896,250 853,600 42,680 896,280
general
37 Kabel Twisted 2 X 10 m' 1,842,950 1,755,200 87,760 1,842,960
38 Kabel Twisted 2 X 16 m' 649,600 618,700 30,935 649,635
39 Kabel TC 2 x 10 mm meter 8,250 7,900 395 8,295
40 Kabel PVC 2 x 1 mm Roll 10,150 9,700 485 10,185
41 Kabel NYY 2,5 mm Roll 8,600 8,200 410 8,610
42 Kabel NYY 2 x 2,5 mm Roll 146,450 139,500 6,975 146,475
43 Kap Lampu 250 watt / 220 V merk GS Unit 342,800 326,500 16,325 342,825
44 Klem kabel Tuistit Buah 1,357,000 1,292,400 64,620 1,357,020
45 Konektor kabel Buah 1,297,150 1,235,400 61,770 1,297,170
46 Kotak Pengaman Buah 23,400 22,300 1,115 23,415
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
47 Kotak sekering khusus LPJU Unit 17,000 16,200 810 17,010
48 Lampu baret Set 199,900 190,400 9,520 199,920
49 Lampu HPIT Buah 118,300 112,700 5,635 118,335
50 Lampu PIJAR 10 W, GE GE Pcs 76,750 73,100 3,655 76,755
51 Lampu PIJAR 10 W, PHILIPS PHILIPS Pcs 395,000 376,200 18,810 395,010
52 Lampu PIJAR 100 W, GE GE Pcs 4,900 4,700 235 4,935
53 Lampu PIJAR 100 W, PHILIPS PHILIPS Pcs 3,550 3,400 170 3,570
54 Lampu PIJAR 25 W, GE GE Pcs 6,600 6,300 315 6,615
55 Lampu PIJAR 25 W, PHILIPS PHILIPS Pcs 5,000 4,800 240 5,040
56 Lampu pijar 25 watt, 40 watt Buah 5,100 4,900 245 5,145
57 Lampu pijar 25, 40, 75 / 220 V Set 3,850 3,700 185 3,885
58 Lampu PIJAR 40 W, GE GE Pcs 7,000 6,700 335 7,035
59 Lampu PIJAR 40 W, PHILIPS PHILIPS Pcs 13,200 12,600 630 13,230
60 Lampu PIJAR 5 W PHILIPS Pcs 5,100 4,900 245 5,145
61 Lampu PIJAR 60 W, GE GE Pcs 4,050 3,900 195 4,095
62 Lampu PIJAR 60 W, PHILIPS PHILIPS Pcs 2,300 2,200 110 2,310
63 Lampu pijar 60 watt, 100 watt Buah 5,100 4,900 245 5,145
64 Lampu PIJAR 75 W, GE GE Pcs 4,050 3,900 195 4,095
65 Lampu PIJAR 75 W, PHILIPS PHILIPS Pcs 8,250 7,900 395 8,295
66 Lampu SELANG mtr 5,100 4,900 245 5,145
67 Lampu TL 1 x 40 Philips Buah 4,400 4,200 210 4,410
Lampu TL 20 W/220 V Komplit
68 Set 17,100 16,300 815 17,115
balas,kaca
Lampu TL 40(philips)
W/220 V Komplit
69 Set 87,350 83,200 4,160 87,360
balas,kaca (philips)
70 MCB 60 A Buah 113,250 107,900 5,395 113,295
71 MCB 60 A - SN 65 Buah 132,150 125,900 6,295 132,195
72 MCB 80 A Buah 696,150 663,000 33,150 696,150
73 MCB 80 A - SN 80 Buah 1,615,200 1,538,300 76,915 1,615,215
74 MCB 10A 1 PHASE MERLIN GERIN Pcs 765,850 729,400 36,470 765,870
75 MCB 10A 3 PHASE MERLIN GERIN Pcs 2,172,000 2,068,600 103,430 2,172,030
76 MCB 16A 1 PHASE MERLIN GERIN Pcs 48,150 45,900 2,295 48,195
77 MCB 16A 3 PHASE MERLIN GERIN Pcs 218,700 208,300 10,415 218,715
78 MCB 20A 1 PHASE MERLIN GERIN Pcs 48,150 45,900 2,295 48,195
79 MCB 20A 3 PHASE MERLIN GERIN Pcs 251,250 239,300 11,965 251,265
80 MCB 25A 1 PHASE MERLIN GERIN Pcs 48,150 45,900 2,295 48,195
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
81 MCB 25A 3 PHASE MERLIN GERIN Pcs 222,250 211,700 10,585 222,285
82 MCB 32A 1 PHASE MERLIN GERIN Pcs 55,200 52,600 2,630 55,230
83 MCB 32A 3 PHASE MERLIN GERIN Pcs 236,550 225,300 11,265 236,565
84 MCB 40A 1 PHASE MERLIN GERIN Pcs 58,900 56,100 2,805 58,905
85 MCB 40A 3 PHASE MERLIN GERIN Pcs 258,050 245,800 12,290 258,090
86 MCB 4A 1 PHASE MERLIN GERIN Pcs 68,100 64,900 3,245 68,145
87 MCB 6A 1 PHASE MERLIN GERIN Pcs 265,300 252,700 12,635 265,335
88 Piting mercury Buah 45,850 43,700 2,185 45,885
89 Pitingan TL 40 watt Buah 48,150 45,900 2,295 48,195
90 Plendes Stel 169,250 161,200 8,060 169,260
91 Relay 15 A Buah 8,250 7,900 395 8,295
92 Sekering kas lokal 1 group Buah 240,950 229,500 11,475 240,975
93 Sekering kas lokal 2 group Buah 137,650 131,100 6,555 137,655
94 Sekering kas lokal 3 group Buah 101,500 96,700 4,835 101,535
95 Servis Kabel Buah 146,550 139,600 6,980 146,580
96 Skakelar (Broco) Engkel Buah 157,900 150,400 7,520 157,920
97 Skakelar / Handel Buah 3,350 3,200 160 3,360
98 Skakelar broco seri Buah 28,450 27,100 1,355 28,455
99 SON - H 220 W PHILIPS PHILIPS Pcs 101,500 96,700 4,835 101,535
100 SON - H 350 W PHILIPS PHILIPS Pcs 16,450 15,700 785 16,485
101 SON - T 150 W PHILIPS PHILIPS Pcs 294,000 280,000 14,000 294,000
102 SON - T 250 W PHILIPS PHILIPS Pcs 372,850 355,100 17,755 372,855
103 SON - T 400 W PHILIPS PHILIPS Pcs 122,000 116,200 5,810 122,010
104 SON - T 70 W PHILIPS PHILIPS Pcs 136,250 129,800 6,490 136,290
105 SON 150 W (LU150/100/D/E/40), GE Pcs 157,800 150,300 7,515 157,815
106 SON 150 W, PHILIPS PHILIPS Pcs 121,650 115,900 5,795 121,695
107 SON 250 W (250/D/E/40), GE Pcs 215,100 204,900 10,245 215,145
108 SON 250 W, PHILIPS PHILIPS Pcs 114,750 109,300 5,465 114,765
109 SON 400 W (LU400//D/E/40), GE Pcs 209,150 199,200 9,960 209,160
110 SON 400 W, PHILIPS PHILIPS Pcs 136,250 129,800 6,490 136,290
111 SON 70 W (LU70/90/D/E/27), GE Pcs 244,100 232,500 11,625 244,125
112 SON 70 W, PHILIPS PHILIPS Pcs 164,950 157,100 7,855 164,955
113 SON-T 150 W (LU150/100/T/E/40), GE Pcs 167,450 159,500 7,975 167,475
114 SON-T 250 W (LU250/T/E/40), GE Pcs 85,950 81,900 4,095 85,995
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
115 SON-T 400 W (LU400/T/E/40), GE Pcs 215,100 204,900 10,245 215,145
116 SON-T 70 W (LU70/90/T/12/E/27), GE Pcs 209,150 199,200 9,960 209,160
117 Stater TL 40 watt Buah 244,100 232,500 11,625 244,125
118 Stop Kontak (Broco) Buah 167,450 159,500 7,975 167,475
119 Stop kontak + Instalasi Buah 5,450 5,200 260 5,460
120 Tabung TL 40 watt (Philips) Buah 28,450 27,100 1,355 28,455
121 Tabung TL 40 watt (Tens) Buah 39,900 38,000 1,900 39,900
122 Titik Lampu + Instalasi TL 1 x 40 watt Buah 78,300 74,600 3,730 78,330
123 Trafo 250 watt Buah 68,000 64,800 3,240 68,040
124 Trafo 40 watt sinar Buah 149,300 142,200 7,110 149,310 32,000
125 Trafo 40 watt Tens Buah 189,300 180,300 9,015 189,315
126 Trafo 400 watt Buah 39,550 37,700 1,885 39,585
127 Trafo mercury 125 watt Buah 35,350 33,700 1,685 35,385
128 WD Kap TL 40 watt khusus LPJU Buah 233,700 222,600 11,130 233,730
129 Yogo Buah 129,000 122,900 6,145 129,045
130 Sewa Truck Crane Lampu Unit/Hari 82,500 78,600 3,930 82,530
131 Sewa Alat bantu penerangan jalan umum Jam 12,450 11,900 595 12,495
132 Sewa alat bantu Roll pipa Roll/Jam 291,450 277,600 13,880 291,480
Sewa mesin bor u/ pemasangan kabel
133 Unit/Hari 8,700 8,300 415 8,715
bawah tanah
134 Pemasangan dan penarikan kabel m 3,250 3,100 155 3,255
135 Roll pipa 2" Unit 233,200 222,100 11,105 233,205
136 Roll pipa 3" Unit 1,750 1,700 85 1,785
137 Roll pipa 4" Unit 16,550 15,800 790 16,590
Pembuatan dan Pemasangan terminal
138 Unit 29,500 28,100 1,405 29,505
dlm tiang
139 Baut Baja ( Ring + mur ) stel 44,900 42,800 2,140 44,940
140 Kotak meter / Box panel Buah 122,500 116,700 5,835 122,535
Lampu mL-10 watt ( Lampu LHE)
141 Set 4,600 4,400 220 4,620
Lengkap
142 mC 25 Ampere Buah 633,550 603,400 30,170 633,570
143 Perakitan Lampu Pertiang Unit 174,900 166,600 8,330 174,930
144 Tarikan kabel/Service Buah 411,900 392,300 19,615 411,915
145 Tiem Switch Unit 87,450 83,300 4,165 87,465
146 Terminal Kabel WK 25 mm Buah 3,350 3,200 160 3,360
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
147 Time Switch / Photocell Unit 637,450 607,100 30,355 637,455
148 Kawat seling m 16,900 16,100 805 16,905
149 Upah tarikan kabel m 150,000 142,900 7,145 150,045
Tiang oktagonal 8 m' Singgle orn Hot
150 Batang 6,400 6,100 305 6,405
dippedoktagonal
Tiang Galvanized
8 m' Double orn Hot
153 Batang 4,925,550 4,691,000 234,550 4,925,550
dippedoktagonal
Tiang Galvanized
7 m' Singgle orn Hot
154 Batang 3,386,250 3,225,000 161,250 3,386,250
dipped Galvanized
Lampu HPS 250 watt ( Lampu HE )
155 Unit 2,973,350 2,831,800 141,590 2,973,390
lengkap
Lampu HPSPremium
250 watt ( Lampu HE )
156 Unit 2,157,200 2,054,500 102,725 2,157,225
lengkap Standar
157 Grounding Set 572,350 545,100 27,255 572,355
158 SON H 250 Watt meter 324,300 308,900 15,445 324,345
159 Dop merkury ml 100 watt Buah 77,150 73,500 3,675 77,175
160 Dop merkury ml 250 watt Buah 117,050 111,500 5,575 117,075
161 Dop merkury ml 500 watt Buah 162,750 155,000 7,750 162,750
162 Son T 250 Buah 205,650 195,900 9,795 205,695
164 Travo 250 Watt mercury Buah 206,300 196,500 9,825 206,325
165 Travo 40 Watt Buah 43,550 41,500 2,075 43,575
166 mC 50 A Buah 774,900 738,000 36,900 774,900
167 Fitingan mercury 250 Watt Buah 188,550 179,600 8,980 188,580
168 WD Kap Lampu 40 Watt Khusus LPJU Buah 90,800 86,500 4,325 90,825
169 TDL 36 Watt Buah 34,200 32,600 1,630 34,230
170 Starter S-20 Buah 5,650 5,400 270 5,670
171 MCB 20 A Buah 79,200 66,000 13,200 79,200
172 MCB 25 A Buah 85,800 71,500 14,300 85,800
173 MCB 32 A Buah 68,650 65,400 3,270 68,670
174 Konektor Kabel Buah 17,700 16,900 845 17,745
175 Kapasitor 25 UF 250 V Buah 75,700 72,100 3,605 75,705
176 Ignitor SN 58 Buah 64,250 61,200 3,060 64,260
177 Time Switch Buah 707,050 673,400 33,670 707,070
178 Foto Cell 6 A Selcon Buah 163,550 155,800 7,790 163,590
179 Tarikal kabel Buah 3,550 3,400 170 3,570
180 Kabel TC 2 x 10 mm meter 8,600 8,200 410 8,610
181 Kabel PVC 2 x 1 mm Roll 146,450 139,500 6,975 146,475
182 Kabel NYY 2,5 mm Roll 342,800 326,500 16,325 342,825
183 Kabel NYY 2 x 2,5 mm Roll 1,357,000 1,292,400 64,620 1,357,020
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
184 Lampu HPIT 400 Watt Roll 435,750 415,000 20,750 435,750
185 Isolasi Unibal Buah 14,800 14,100 705 14,805
186 Tang Amper Buah 767,750 731,200 36,560 767,760
187 Tang proton Buah 331,350 315,600 15,780 331,380
188 Obeng proton Buah 331,350 315,600 15,780 331,380
189 Engkol Inggris Buah 69,900 66,600 3,330 69,930
190 Kap Piring Dop mercury 250 Watt Buah 70,650 67,300 3,365 70,665
191 mC 80 A Buah 850,600 810,100 40,505 850,605
192 Sabuk Pengaman Buah 3,899,550 3,713,900 185,695 3,899,595
193 Fitingan TL 40 Watt Set 8,600 8,200 410 8,610
194 Testpen Buah 19,500 18,600 930 19,530
195 Avometer Buah 289,900 276,100 13,805 289,905
196 Box MCB 12 grup Buah 116,550 111,000 5,550 116,550
197 ELCB 3 x 40 A 1 Pahse Buah 412,750 393,100 19,655 412,755
198 ELCB 3 x 25 A 3 Pahse Buah 816,150 777,300 38,865 816,165
199 TEE Dos Buah 1,850 1,800 90 1,890
200 In Bodos Buah 900 900 45 945
201 Lampu TL RMI 2 x 20 watt reflektor Set 262,500 250,000 12,500 262,500
202 Lampu Downlight haogen 20 watt + Travo Set 210,000 200,000 10,000 210,000
203 ELCB 40 Ampere Buah 599,600 499,700 99,940 599,640
204 perangkat sistem monitoring LPJU unit 14,705,250 200,000 10,000 210,000
main unit, wishet module, 1/0, display,
499,700 99,940 599,640
tombol, sensor,
mur 3 mm, packaging + box panel,
12,254,400 2,450,880 14,705,280
kabel engkel
205 Lampu HPIT 400 wtt lengkap unit 2,016,000 1,680,000 336,000 2,016,000
207 Photocell 6 A Selcon buah 186,950 155,800 31,160 186,960
607,100 121,420 728,520
M BAHAN INSTALASI LISTRIK 155,800 31,160 186,960
1 BP VA 900 900 45 945
2 JILP VA 100 100 5 105
3 SLO VA 100 - -
4 Gambar Instalasi VA 100 100 5 105
5 ATS 197 KVA Unit 162,375,950 154,643,800 7,732,190 162,375,990
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
6 Battery Charger Unit 3,206,700 3,054,000 152,700 3,206,700
7 Battery Accu Unit 3,498,150 3,331,600 166,580 3,498,180
8 Dudukan Accu Unit 641,200 610,700 30,535 641,235
9 Panel KWH Buah 1,148,050 1,093,400 54,670 1,148,070
10 Box Panel Buah 17,491,100 16,658,200 832,910 17,491,110
11 Saklar 630 A Buah 3,305,800 3,148,400 157,420 3,305,820
12 Plat Cooper 2,5 mm x 3 cm meter 408,100 388,700 19,435 408,135
13 Skun Kabel 150 mm Buah 48,150 45,900 2,295 48,195
14 Grounding dan BC 50 mm Set 671,550 639,600 31,980 671,580
15 mCCB 250 A Buah 2,915,200 2,776,400 138,820 2,915,220
16 mCCB 100 A Buah 2,040,650 1,943,500 97,175 2,040,675
17 ELCB 500 mA Buah 991,050 943,900 47,195 991,095
18 ELCB 300 mA Buah 845,450 805,200 40,260 845,460
19 Plat Cooper 0,5 mm dan Isolatror meter 291,450 277,600 13,880 291,480
20 Lampu Kontrol dan Ampere Set 1,807,450 1,721,400 86,070 1,807,470
21 Sub Panel Kontrol Uk. 40 x 60 x 90 Buah 633,550 603,400 30,170 633,570
22 Sub Panel Kontrol Uk. 20 x 80 x 60 Buah 524,650 499,700 24,985 524,685
23 Grounding dan BC 25 mm Set 642,900 612,300 30,615 642,915
24 Skun Kabel 10 - 25 mm Buah 9,850 9,400 470 9,870
25 Skun Kabel 50 - 75 mm Buah 26,850 25,600 1,280 26,880
26 MCB 10 - 20 A 1 Phase Buah 48,150 45,900 2,295 48,195
27 Kabel NYY 1 x 150 mm meter 172,600 164,400 8,220 172,620
28 Kabel NYY 4 x 70 mm meter 330,950 315,200 15,760 330,960
29 Kabel NYY 4 x 10 mm meter 112,450 107,100 5,355 112,455
30 Kabel NYY 1 x 6 mm meter 5,650 5,400 270 5,670
31 Tiang 9 meter Buah 1,942,150 1,849,700 92,485 1,942,185
32 Konstruksi TR meter 404,000 384,800 19,240 404,040
33 Box Panel 60 x 80 cm Buah 524,650 499,700 24,985 524,685
34 mCCB 400 A Buah 4,489,350 4,275,600 213,780 4,489,380
35 mCCB 160 A Buah 2,128,100 2,026,800 101,340 2,128,140
36 mCCB 100 A Buah 2,040,650 1,943,500 97,175 2,040,675
37 ELCB 40 A Buah 524,650 499,700 24,985 524,685
38 Baut 8 mm Buah 5,250 5,000 250 5,250
39 Box Panel 20 x 80 x 60 Buah 524,650 499,700 24,985 524,685
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
40 Kabel TC 2 x 70 + 1 x 50 meter 60,650 57,800 2,890 60,690
66,900 3,345 70,245
UPAH PENGERJAAN BAHAN
N 60,000 3,000 63,000
INSTALASI LISTRIK
1 ATS 197 KVA Unit 2,915,200 2,776,400 138,820 2,915,220
2 Battery Charger Unit 291,450 277,600 13,880 291,480
3 Battery Accu Unit 87,450 83,300 4,165 87,465
4 Dudukan Accu Unit 174,900 166,600 8,330 174,930
5 Panel KWH Buah 157,350 149,900 7,495 157,395
6 Box Panel Buah 1,101,950 1,049,500 52,475 1,101,975
7 Saklar 630 A Buah 419,750 399,800 19,990 419,790
8 Plat Cooper 2,5 mm x 3 cm meter 110,750 105,500 5,275 110,775
10 Grounding dan BC 50 mm Set 64,150 61,100 3,055 64,155
11 mCCB 250 A Buah 419,750 399,800 19,990 419,790
12 mCCB 100 A Buah 314,750 299,800 14,990 314,790
13 ELCB 500 mA Buah 116,550 111,000 5,550 116,550
14 ELCB 300 mA Buah 116,550 111,000 5,550 116,550
15 Plat Cooper 0,5 mm dan Isolatror meter 99,200 94,500 4,725 99,225
16 Lampu Kontrol dan Ampere Set 174,900 166,600 8,330 174,930
17 Sub Panel Kontrol Uk. 40 x 60 x 90 Buah 145,800 138,900 6,945 145,845
18 Sub Panel Kontrol Uk. 20 x 80 x 60 Buah 145,800 138,900 6,945 145,845
19 Grounding dan BC 25 mm Set 64,150 61,100 3,055 64,155
22 MCB 10 - 20 A 1 Phase Buah 11,750 11,200 560 11,760
23 Kabel NYY 1 x 150 mm meter 17,500 16,700 835 17,535
24 Kabel NYY 4 x 70 mm meter 14,700 14,000 700 14,700
25 Kabel NYY 4 x 10 mm meter 8,700 8,300 415 8,715
26 Kabel NYY 1 x 6 mm meter 8,700 8,300 415 8,715
28 Konstruksi TR meter 12,250 11,700 585 12,285
29 Box Panel 60 x 80 cm Buah 145,800 138,900 6,945 145,845
30 mCCB 400 A Buah 419,750 399,800 19,990 419,790
31 mCCB 160 A Buah 314,750 299,800 14,990 314,790
32 mCCB 100 A Buah 314,750 299,800 14,990 314,790
33 ELCB 40 A Buah 116,550 111,000 5,550 116,550
34 Baut 8 mm Buah 600 600 30 630
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
35 Box Panel 20 x 80 x 60 Buah 145,800 138,900 6,945 145,845
36 Kabel TC 2 x 70 + 1 x 50 meter 1,750 1,700 85 1,785
- -
O BAHAN PENGGANTUNG - -
1 Dor Closer Buah 265,400 252,800 12,640 265,440
2 Dor Holder Buah 53,000 50,500 2,525 53,025
3 Dor Stop Buah 42,500 40,500 2,025 42,525
4 Engsel angin Buah 21,500 20,500 1,025 21,525
5 Engsel H Stl 7,750 7,400 370 7,770
6 Engsel jendela Buah 15,850 15,100 755 15,855
8 Engsel Kuningan Arch asli Stel 25,500 24,300 1,215 25,515
9 Engsel Nylon ARCH asli (Jendela) Set 53,550 51,000 2,550 53,550
10 Engsel Nylon ARCH asli (pintu) Set 53,550 51,000 2,550 53,550
11 Engsel pintu Buah 20,000 13,700 685 14,385
12 Engsel pintu Aluminium biasa Unit 51,650 49,200 2,460 51,660
13 Engsel pintu Aluminium stenlees Unit 57,300 54,600 2,730 57,330
14 Espanyolet Buah 26,650 25,400 1,270 26,670
15 Engsel Pintu 4 " 4" Buah 81,850 77,990 3,900 81,890
16 Engsel jendela 3" 3" Buah 56,650 53,990 2,700 56,690
18 Gembok Buah 28,750 27,400 1,370 28,770
19 Grendel Bj 14,800 14,100 705 14,805
20 Grendel biasa (besar) Buah 11,750 11,200 560 11,760
21 Grendel biasa (kecil) Buah 9,000 8,600 430 9,030
25 Grendel tanam Set 34,200 32,600 1,630 34,230
26 Hak angin 44 mm (lurus) Buah 10,000 7,100 355 7,455
27 Hak angin besar Buah 21,500 20,500 1,025 21,525
28 Kunci Anchor 2 x putar Buah 74,850 71,300 3,565 74,865
29 Kunci knip Buah 17,100 16,300 815 17,115
30 Kunci merk Union 2 x putar Buah 74,850 71,300 3,565 74,865
34 Kunci tanam (808) Bj 51,000 48,600 2,430 51,030
Kunci tanam besar kuda terbang 2 x
35 Bj 89,850 85,600 4,280 89,880
putar
36 Kunci tanam besar medico 2 x putar Bj 170,000 144,600 7,230 151,830
37 Kunci tanam kamar mandi Bj 49,450 47,100 2,355 49,455
38 Pegangan pintu Buah 80,000 35,500 1,775 37,275
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
6,108,000 305,400 6,413,400
P BAHAN LANGIT-LANGIT 6,108,000 305,400 6,413,400
1 Asbes datar tebal 4 mm (60 x 200) Lembar 39,750 37,900 1,895 39,795
2 Asbes datar tebal 5 mm (60 x 200) Lembar 51,200 48,800 2,440 51,240
3 Asbes datar tebal 6 mm (40 x 200) Lembar 57,850 55,100 2,755 57,855
Asbes gelombang besar tebal 5 mm
4 Lembar 107,600 102,500 5,125 107,625
(3,05
Asbesxgelombang
1,05) kecil tebal 4 mm
5 Lembar 78,850 75,100 3,755 78,855
(3,05
Asbesxwuwung
1,05) gelombang besar tebal
6 Lembar 23,300 22,200 1,110 23,310
5 mm wuwung gelombang kecil tebal
Asbes
7 Lembar 21,500 20,500 1,025 21,525
4 mm
8 Asbes Gelombang Uk 300 x 102 cm. Merk Djabes Lembar 97,500 ketahanan pangan
9 Eeternite Ex Kerang Lembar 16,000 9,200 460 9,660
10 Eternite Sakura Lembar 16,000 9,200 460 9,660
11 Genteng Beton Bj 5,250 5,000 250 5,250
12 Genteng flam pres jawa / lokal Bj 1,250 1,200 60 1,260
13 Genteng Karang pilang / Wisma Bj 3,850 3,700 185 3,885
14 Genteng karang pilang lokal Bj 1,550 1,500 75 1,575
15 Genteng Metal Roof + Insulin Isodec m2 92,000
16 Genteng Metal Roof 0.3 mm, Isodec m2 97,750
17 Genteng Zincalume Wina m2 95,000
18 Genteng karang pilang/ Bima Ambulu Bj 3,350 3,200 160 3,360
19 Genteng Nok Palentong Bj 10,600 10,100 505 10,605
20 Genteng Palentong Bj 2,100 2,000 100 2,100
21 Genteng Type Perancis/ moronda Bj 5,100 4,900 245 5,145
22 Genteng Wuwung flam pres lokal Bj 3,450 3,300 165 3,465
23 Genteng wuwung karangpilang / Wisma Bj 11,750 11,200 560 11,760
24 Genteng Wuwung karangpilang lokal Bj 6,800 6,500 325 6,825
Genteng Wuwung Karangpilang/ Bima
25 Bj 7,450 7,100 355 7,455
Ambulu
Genteng Wuwung Type Perancis/
26 Bj 7,450 7,100 355 7,455
moronda
Gypsum board 9 mm merk Elephant
27 Lembar 97,100 92,500 4,625 97,125
uk. 1,20 x 2,40 m
Gypsum board 9 mm merk Indal uk.
28 Lembar 90,800 86,500 4,325 90,825
1,20 x 2,40 m
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
30 Nok Genteng Beton Bj 11,750 11,200 560 11,760
31 Nok Stel Gelombang Lembar 17,100 16,300 815 17,115
32 Plat asbes tebal 3,5 mm (1,00 x 1,00) Lembar 18,050 17,200 860 18,060
33 Plat asbes tebal 4 mm (1,00 x 1,00) Lembar 31,900 30,400 1,520 31,920
34 Plat asbes tebal 5 mm (1,00 x 1,00) Lembar 61,500 58,600 2,930 61,530
35 Plywood tebal 4 mm (0,40 x 0,80) Lembar 97,750 93,100 4,655 97,755
36 Plywood tebal 4 mm (1,22 x 2,44) Lembar 84,800 80,800 4,040 84,840
37 Plywood tebal 6 mm (0,40 x 0,80) Lembar 110,350 105,100 5,255 110,355
38 Plywood tebal 9 mm (1,22 x 2,44) Lembar 168,700 160,700 8,035 168,735
39 Seng gelombang bwg 32 Lembar 103,300 98,400 4,920 103,320
42 Seng BJLs 20/ 43 cm m' 15,300 14,600 730 15,330
44 Teakwood tebal 4 mm (1,10 x 2,10) Lembar 149,400 142,300 7,115 149,415
45 Teakwood tebal 4 mm (1,22 x 2,44) Lembar 157,150 149,700 7,485 157,185
50 Talang datar BH 159,300 132,780 26,556 159,336
51 Pipa tegak BH 209,450 174,550 34,910 209,460
52 Penyambung talang Buah 49,650 41,400 8,280 49,680
53 Penggantung talang Buah 32,400 27,000 5,400 32,400
54 Penutup talang Buah 39,600 33,000 6,600 39,600
55 Corong penampung Buah 93,600 78,000 15,600 93,600
56 Pipa lengkung Buah 126,000 105,000 21,000 126,000
57 Penahan pipa Buah 36,000 30,000 6,000 36,000
58 Talang sudut dalam Buah 158,400 132,000 26,400 158,400
59 Talang sudut luar Buah 158,400 132,000 26,400 158,400
60 Penahan limpahan sudut Buah 72,000 60,000 12,000 72,000
61 Penahan limpahan lurus Buah 72,000 60,000 12,000 72,000
62 Pipa cabang Buah 150,000 125,000 25,000 150,000
63 Sepatu pipa Buah 126,000 105,000 21,000 126,000
64 Spacer Buah 21,600 18,000 3,600 21,600
65 Skrup Buah 1,800 1,500 300 1,800
66 Penahan pipa extra Buah 72,000 60,000 12,000 72,000
73 Plat asbes tebal 3,5 mm (1,00 x 1,00) Lembar 19,000

Q BAHAN TEMPEL LANTAI DAN DINDING 80,000 16,000 96,000


1 Batu paras m² 78,850 75,100 3,755 78,855
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
2 Batu alam/ palimanan m² 109,050 103,900 5,195 109,095
3 Batu tempel hitam/ candi 15/30 m² 115,350 109,900 5,495 115,395
4 Batu tempel hitam/ candi 10/20 m² 102,650 97,800 4,890 102,690
5 Batu Lempeng 10/20 m² 109,250 73,400 3,670 77,070
6 Batu Lempeng Acak m² 38,500 36,700 1,835 38,535
7 Batu Andesit Bakar 10/20 m² 192,450 183,300 9,165 192,465
8 Batu Liforigreen 10/20 m² 102,650 97,800 4,890 102,690
9 Batu Alur Candi m² 192,450 183,300 9,165 192,465
10 Batu marmer Bakar Pink 10/20 m² 122,000 116,200 5,810 122,010
11 Batu marmer Bakar Pink 15/15 m² 122,000 116,200 5,810 122,010
12 Batu marmer Bakar Pink 15/30 m² 147,600 140,600 7,030 147,630
13 Granite Tile 60 x 60 Ex. Granito 322,000
14 Kanstin beton 10 x 20 x 40 cm Buah 21,500 20,500 1,025 21,525
15 Kanstin beton 15 x 30 x 40 cm Buah 21,500 20,500 1,025 21,525
16 Keramik wafel 10 x 20 (KW. 1) biru m² 59,700 56,900 2,845 59,745
17 Keramik wafel 20 x 20 (KW. 1) biru m² 61,950 59,000 2,950 61,950
18 Keramik wafel 30 x 30 (KW. 1) milan m² 74,000 70,500 3,525 74,025
26 Paving Trapesium Biji 168,300
Paving stone persegi abu-abu tebal 10
28 m² 85,950 81,900 4,095 85,995
cm halus
Paving stone persegi abu-abu tebal 10
29 m² 85,950 81,900 4,095 85,995
cm kasar
Paving stone persegi abu-abu tebal 6
30 m² 53,950 51,400 2,570 53,970
cm halus
Paving stone persegi abu-abu tebal 6
31 m² 53,950 51,400 2,570 53,970
cm kasar
Paving stone persegi abu-abu tebal 8
32 m² 63,000 60,000 3,000 63,000
cm halus
Paving stone persegi abu-abu tebal 8
33 m² 63,000 60,000 3,000 63,000
cm kasar
34 Paving Stone segi enam tebal 5 cm m² 43,050 41,000 2,050 43,050
35 Paving stone segi enam 6 cm halus m² 46,600 44,400 2,220 46,620
36 Paving stone segi enam tebal 8 cm halus m² 60,900 58,000 2,900 60,900
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
37 Roster 12x11x24 cm Buah 43,050 41,000 2,050 43,050
38 Tegel Badag merah 30/30 m² 50,150 47,800 2,390 50,190
39 Tegel Badag Hitam 30/30 m² 50,150 47,800 2,390 50,190
40 Tegel keramik 10 x 20 cm motif m² 72,750 69,300 3,465 72,765
41 Tegel keramik 10 x 20 cm polos m² 67,050 63,900 3,195 67,095
42 Tegel keramik 20 x 20 cm motif m² 61,500 58,600 2,930 61,530
43 Tegel keramik 20 x 20 cm polos m² 53,000 44,400 2,220 46,620
44 Tegel keramik 20 x 25 cm motif m² 60,000 51,200 2,560 53,760
45 Tegel keramik 20 x 25 cm polos m² 54,000 45,900 2,295 48,195
46 Tegel keramik 30 x 30 cm motif m² 49,000 43,700 2,185 45,885
47 Tegel keramik 30 x 30 cm polos m² 47,000 38,300 1,915 40,215
48 Tegel keramik 40 x 40 cm motif m² 56,800 54,100 2,705 56,805
49 Tegel keramik 40 x 40 cm polos m² 52,350 49,900 2,495 52,395
50 Tegel PC abu-abu 20 x 20 cm m² 39,350 37,500 1,875 39,375
51 Tegel plint PC warna 10 x 20 cm m' 15,850 15,100 755 15,855
52 Tegel plint ubin 15 x 20 cm m' 18,050 17,200 860 18,060
53 Tegel plint ubin teraso 10 x 30 cm m' 15,850 15,100 755 15,855
54 Tegel porselen 11 x 11 cm m² 48,800 46,500 2,325 48,825
55 Tegel teraso 20 x 20 cm m² 57,300 54,600 2,730 57,330
56 Tegel teraso 30 x 30 cm m² 49,000 46,700 2,335 49,035
62 Ubin warna 20 x 20 cm m² 46,700 44,500 2,225 46,725
63 Keramik Flint Artistic m 145,100 138,200 6,910 145,110
64 Keramik Dinding 25 x 50 m² 132,150 125,900 6,295 132,195
65 Kanstin 40 x 30 x 10 K 250 buah 21,200
66 Kanstin 40 x 30 x 10 K 250 buah 22,700
67 Kanstin 40 x 30 x 10 K 250 buah 24,200
68 Kanstin 40 x 30 x 10 K 250 buah 18,500
69 Kanstin 40 x 30 x 10 K 250 buah 19,600
70 Kanstin 40 x 30 x 10 K 300 buah 20,700
72 Granite Tile 80 x 80 dos 239,050 227,700 11,385 239,085
73 Granite Tile 30 x 60 dos 262,350 249,900 12,495 262,395
74 Granite Tile 30 x 30 dos 139,850 133,200 6,660 139,860
75 Granite Artistik 10 x 20 dos 139,850 133,200 6,660 139,860
79 Grass Block 54 x 36x 6 M2 147,800 140,780 7,039 147,819
Uk.60x60(Neptune
81 Granit Tile M2 446,250 425,000 21,250 446,250
Black) Decogres
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Uk.60x60(Neptune
82 Granit Tile M2 446,250 425,000 21,250 446,250
Black) Decogres
R BAHAN SANITAIR 85,000 17,000 102,000
1 Afour Buah 38,600 36,800 1,840 38,640
2 Bak air (tandon) Fibre kapasitas 550 m² Buah 645,500 614,800 30,740 645,540
3 Bak cuci piring logam 100 Buah 352,650 335,900 16,795 352,695
4 Bak cuci piring logam 80 Buah 262,350 249,900 12,495 262,395
5 Bak teraso Buah 158,550 151,000 7,550 158,550
7 Gorong-gorong beton diameter 40 cm m' 85,450 81,400 4,070 85,470
8 Gorong-gorong beton diameter 50 cm m' 106,750 101,700 5,085 106,785
9 Gorong-gorong beton diameter 100 cm m' 181,850 173,200 8,660 181,860
11 Klosed Duduk Non Standart Toto unit 2,415,000
12 Klosed Duduk Merk TOTO U57W/F Set 2,518,500
13 Klosed Duduk Merk TOTO U104W/F Set 2,403,500
14 Klosed duduk porselint Komp. (AS) Buah 805,950 767,600 38,380 805,980
15 Klosed duduk putih porselen komplit Buah 1,147,400 1,092,800 54,640 1,147,440
16 Klosed jongkok keramik (Ina) muda Buah 122,000 116,200 5,810 122,010
17 Klosed jongkok keramik (Ina) tua Buah 150,650 143,500 7,175 150,675
18 Klosed jongkok porselen warna putih Buah 116,550 111,000 5,550 116,550
19 Klosed jongkok teraso lokal Buah 74,850 71,300 3,565 74,865
20 Kran biasa Buah 21,500 20,500 1,025 21,525
21 Pipa / slang spiral saluran kran Set 71,600 68,200 3,410 71,610
22 Seal Tape Buah 2,700 2,600 130 2,730
26 Wastafel keramik (Ina) muda Buah 502,000 478,100 23,905 502,005
28 Kran Sedang Buah 52,350 49,900 2,495 52,395
29 Double Kran Buah 291,450 277,600 13,880 291,480
30 Kran Sensor buah 1,575,000 1,500,000 75,000 1,575,000
31 Hand driyer buah 984,350 937,500 46,875 984,375
127,300 6,365 133,665
S BAHAN PAKU 180,300 9,015 189,315
2 Paku beton besar Biji 900 900 45 945
3 Paku beton kecil Kg 23,700 22,600 1,130 23,730
4 Paku dur 5" Kg 18,650 17,800 890 18,690
5 Paku eternite Kg 25,900 24,700 1,235 25,935
6 Paku Jembatan Kg 13,000 12,400 620 13,020
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
7 Paku keling 3/4", 5/8", 7/8" Kg 21,200 20,200 1,010 21,210
8 Paku pancing Kg 22,350 21,300 1,065 22,365
10 Paku reng 2" Kg 12,900 12,300 615 12,915
11 Paku seng Kg 23,100 22,000 1,100 23,100
16 Paku usuk Kg 14,000 12,300 615 12,915
747,800 37,390 785,190
T BAHAN KAYU 1,212,100 60,605 1,272,705
1 Kayu balau (balok) m3 8,162,450 7,773,800 388,690 8,162,490
2 Kayu balau (usuk) m3 7,888,500 7,512,900 375,645 7,888,545
3 Kayu bengkirai (reng) m3 7,854,600 7,480,600 374,030 7,854,630
6 Kayu bengkirai (usuk) m3 11,500,000 8,605,700 430,285 9,035,985
7 Kayu jati balok 8/12, 6/12 m3 19,001,200 18,096,400 904,820 19,001,220
8 Kayu jati papan 2/20 x 2 m m3 18,174,450 17,309,000 865,450 18,174,450
9 Kayu jati reng 2/3, 3/5 m3 16,985,000 16,176,200 808,810 16,985,010
10 Kayu jati usuk 5/7, 4/6, 3/5 m3 14,044,150 13,375,400 668,770 14,044,170
11 Kayu kamper balok 6/12 m3 9,660,000 8,551,200 427,560 8,978,760
12 Kayu kamper balok 8/12 m3 9,660,000 8,551,200 427,560 8,978,760
13 Kayu kamper balok 8/15 m3 9,660,000 8,551,200 427,560 8,978,760
14 Kayu kamper usuk 3/5 m3 7,187,500 4,886,400 244,320 5,130,720
15 Kayu kamper usuk 4/6 m3 7,187,500 5,497,200 274,860 5,772,060
16 Kayu kamper usuk 5/7 m3 7,187,500 5,497,200 274,860 5,772,060
17 Kayu kamper reng 2/3, 3/5 m3 7,187,500 4,886,400 244,320 5,130,720
18 Kayu kamper papan 2/20 x 4 m m3 11,500,000 8,856,700 442,835 9,299,535
19 Kayu kamper papan 2/30 x 4 m m3 11,500,000 9,162,000 458,100 9,620,100
20 Kayu kruing balok 6/12 m3 7,935,000 6,108,000 305,400 6,413,400
21 Kayu kruing balok 8/12 m3 7,935,000 6,108,000 305,400 6,413,400
22 Kayu kruing balok 8/15 m3 7,935,000 6,108,000 305,400 6,413,400
23 Kayu kruing usuk 3/5 m3 6,037,500 4,275,600 213,780 4,489,380
24 Kayu kruing usuk 4/6 m3 6,037,500 4,581,000 229,050 4,810,050
25 Kayu kruing usuk 5/7 m3 6,037,500 4,581,000 229,050 4,810,050
26 Kayu kruing reng 2/3, 3/5 m3 6,037,500 4,275,600 213,780 4,489,380
27 Kayu kruing papan 2/20 x 4 m m3 8,510,000 6,413,400 320,670 6,734,070
28 Kayu kruing papan 2/30 x 2 m m3 8,510,000 6,718,900 335,945 7,054,845
29 Kayu lokal usuk 4/6 x 200/250 m3 3,450,000 2,198,900 109,945 2,308,845
30 Kayu lokal usuk 5/7 x 200/250 m3 3,450,000 2,198,900 109,945 2,308,845
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
31 Kayu lokal reng 2/3, 3/5 x 2 m m3 2,645,000 1,832,400 91,620 1,924,020
32 Kayu lokal papan 2/20 x 4 m m3 4,945,000 3,664,900 183,245 3,848,145
33 Kayu meranti balok 6/12 m3 5,750,000 5,191,800 259,590 5,451,390
34 Kayu meranti balok 8/12 m3 5,750,000 5,191,800 259,590 5,451,390
35 Kayu meranti balok 8/15 m3 5,750,000 5,191,800 259,590 5,451,390
36 Kayu meranti usuk 3/5 m3 4,887,500 3,664,900 183,245 3,848,145
37 Kayu meranti usuk 4/6 m3 4,887,500 3,970,200 198,510 4,168,710
38 Kayu meranti usuk 5/7 m3 4,887,500 3,970,200 198,510 4,168,710
39 Kayu meranti reng 2/3, 3/5 m3 4,887,500 3,664,900 183,245 3,848,145
40 Kayu meranti papan 2/20 x 4 m m3 6,497,500 5,497,200 274,860 5,772,060
41 Kayu meranti papan 3/20 x 4 m m3 6,497,500 5,802,700 290,135 6,092,835
44 Kayu Papan Recycle M3 20,000,000
45 List kayu 2/4 kamper m² 6,023,850 5,737,000 286,850 6,023,850
46 List kayu propil m' 12,900 12,300 615 12,915
47 Kayu Mindi ( balok)6/12 M3 8,925,000 8,500,000 425,000 8,925,000
48 Kayu Mindi ( balok ) 8/12 M3 8,925,000 8,500,000 425,000 8,925,000
49 Kayu Mindi papan 2/20 x 4 m M3 9,344,450 8,899,500 444,975 9,344,475
50 Kayu Mindi papan 2/30 x 4 m M2 9,652,800 9,193,183 459,659 9,652,842
51 Reng Kaper 2 x 3 x 4 Batang 26,400 22,000 4,400 26,400
52 Reng Meranti 2 x 3 x 4 Batang 14,400 12,000 2,400 14,400
53 Reng Borneo 2 x 3 x 4 Batang 12,000 10,000 2,000 12,000
54 Reng Kamper 3 x 4 x 4 Batang 42,000 35,000 7,000 42,000
55 Reng Meranti 3 x 4 x 4 Batang 26,400 22,000 4,400 26,400
56 Reng Borneo 3 x 4 x 4 Batang 18,000 15,000 3,000 18,000
57 Kaso Kamper 4 x 6 x 4 Batang 80,400 67,000 13,400 80,400
58 Kaso Meranti 4 x 6 x 4 Batang 45,600 38,000 7,600 45,600
59 Kaso Borneo 4 x 6 x 4 Batang 34,800 29,000 5,800 34,800
60 Kaso Kamper 5 x 7 x 4 Batang 114,000 95,000 19,000 114,000
61 Kaso Meranti 5 x 7 x 4 Batang 66,000 55,000 11,000 66,000
62 Kaso Borneo 5 x 7 x 4 Batang 54,000 45,000 9,000 54,000
63 Galar Kamper 5 x 10 x 4 Batang 192,000 160,000 32,000 192,000
64 Galar Meranti 5 x 10 x 4 Batang 96,000 80,000 16,000 96,000
65 Galar Borneo 5 x 10 x 4 Batang 72,000 60,000 12,000 72,000
66 Balok Kamper 6 x 12 x 4 Batang 276,000 230,000 46,000 276,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
67 Balok Meranti 6 x 12 x 4 Batang 120,000 100,000 20,000 120,000
68 Balok Borneo 6 x 12 x 4 Batang 102,000 85,000 17,000 102,000
69 Balok Kamper 8 x 12 x 4 Batang 372,000 310,000 62,000 372,000
70 Balok Meranti 8 x 12 x 4 Batang 180,000 150,000 30,000 180,000
71 Balok Borneo 8 x 12 x 4 Batang 138,000 115,000 23,000 138,000
72 Papan Kamper 3 x 20 x 4 Batang 318,000 265,000 53,000 318,000
73 Papan Meranti 3 x 20 x 4 Batang 144,000 120,000 24,000 144,000
74 Papan Borneo 3 x 20 x 4 Batang 102,000 85,000 17,000 102,000
75 Kayu Meranti 4 x 6 Batang (4m) 39,000 32,500 6,500 39,000
76 Kayu Meranti 5 x 7 Batang (4m) 46,800 39,000 7,800 46,800
77 Kayu Borneo 4 x 6 Batang (4m) 33,600 28,000 5,600 33,600
78 Kayu Borneo 5 x 7 Batang (4m) 51,600 43,000 8,600 51,600
79 Kayu Kamper 4 x 6 Batang (4m) 60,000 50,000 10,000 60,000
80 Kayu Kamper 5 x 7 Batang (4m) 84,000 70,000 14,000 84,000
81 Kayu Galar Meranti 5 x 10 Batang (4m) 72,000 60,000 12,000 72,000
82 Kayu Galar Borneo 5 x 10 Batang (4m) 72,000 60,000 12,000 72,000
83 Kayu Galar Kamper 5 x 10 Batang (4m) 114,000 95,000 19,000 114,000
84 Kayu Balok Meranti 6 x 12 Batang (4m) 96,000 80,000 16,000 96,000
85 Kayu Balok Meranti 8 x 12 Batang (4m) 150,000 125,000 25,000 150,000
86 Kayu Balok Borneo 6 x 12 Batang (4m) 96,000 80,000 16,000 96,000
87 Kayu Balok Borneo 8 x 12 Batang (4m) 120,000 100,000 20,000 120,000
88 Kayu Balok Kamper 6 x 12 Batang (4m) 222,000 185,000 37,000 222,000
89 Kayu Balok Kamper 8 x 12 Batang (4m) 252,000 210,000 42,000 252,000
46,900 2,345 49,245
U BAHAN KACA 71,600 3,580 75,180
3 Kaca naco Lembar 7,550 7,200 360 7,560
4 Kaca Patri 3 mm perMeter 2,400,000 2,000,000 400,000 2,400,000
5 Kaca Patri (Airbrush) 3 mm perMeter 3,000,000 2,500,000 500,000 3,000,000
6 Kaca Patri (Kuningan) 3 mm perMeter 3,240,000 2,700,000 540,000 3,240,000
7 Kaca Inlay 5 mm perMeter 3,000,000 2,500,000 500,000 3,000,000
8 Kaca Inlay 8 mm perMeter 3,000,000 2,500,000 500,000 3,000,000
9 Kaca Grafir (3D) 5 mm perMeter 1,800,000 1,500,000 300,000 1,800,000
10 Kaca Grafir (3D) 8 mm perMeter 1,800,000 1,500,000 300,000 1,800,000
11 Kaca Grafir (Sandblasting) 3mm perMeter 1,800,000 1,500,000 300,000 1,800,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
12 Kaca Grafir (Sandblasting) 5 mm perMeter 1,800,000 1,500,000 300,000 1,800,000
13 Kaca Grafir (Sandblasting) 8 mm perMeter 1,800,000 1,500,000 300,000 1,800,000
Kaca Grafir (Sandblasting Kaca
14 perMeter 1,800,000 1,500,000 300,000 1,800,000
Cermin) 3 mm
Kaca Grafir (Sandblasting Kaca
15 perMeter 1,800,000 1,500,000 300,000 1,800,000
Cermin) 5 mm
16 Kaca Grafir Airbrush (3D) 5 mm perMeter 2,040,000 1,700,000 340,000 2,040,000
17 Kaca Grafir Airbrush (3D) 8 mm perMeter 2,040,000 1,700,000 340,000 2,040,000
Kaca Grafir Airbrush (Sandblasting) 3
18 perMeter 2,040,000 1,700,000 340,000 2,040,000
mm
Kaca Grafir Airbrush (Sandblasting) 5
19 perMeter 2,040,000 1,700,000 340,000 2,040,000
mm
Kaca Grafir Airbrush (Sandblasting) 8
20 perMeter 2,040,000 1,700,000 340,000 2,040,000
mm
Kaca Grafir Airbrush (Sandblasting
21 perMeter 2,040,000 1,700,000 340,000 2,040,000
Kaca Cermin) 3 mm
Kaca Grafir Airbrush (Sandblasting
22 perMeter 2,040,000 1,700,000 340,000 2,040,000
Kaca Cermin) 5 mm
23 Kaca polos tebal 2 mm m² 54,000 45,000 9,000 54,000
24 Kaca polos tebal 3 mm m² 66,000 55,000 11,000 66,000
25 Kaca polos tebal 5 mm m² 90,000 75,000 15,000 90,000
26 Kaca bening tebal 3 mm m² 96,000 80,000 16,000 96,000
27 Kaca bening tebal 5 mm m² 105,000 87,500 17,500 105,000
28 Kaca bening tebal 8 mm m² 168,000 140,000 28,000 168,000
29 Kaca bening tebal 10 mm m² 240,000 200,000 40,000 240,000
30 Kaca rayban tebal 3 mm m² 78,000 65,000 13,000 78,000
32 Kaca rayban tebal 8 mm m² 150,000 125,000 25,000 150,000
33 Kaca rayban tebal 10 mm m² 264,000 220,000 44,000 264,000
34 Kaca Tempered 5 mm m² 223,000 200,000 40,000 240,000
35 Kaca Tempered 6 mm m² 390,000 250,500 50,100 300,600
36 Kaca Tempered 8 mm m² 390,000 375,000 75,000 450,000
37 Kaca Tempered 10 mm m² 950,000 400,000 80,000 480,000
38 Kaca Tempered 12 mm m² 1,425,000 450,000 90,000 540,000
39 Kaca Tempered 15 mm m² 3,500,000 1,950,000 390,000 2,340,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
40 Kaca Tempered 19 mm m² 2,940,000 2,450,000 490,000 2,940,000
41 Kaca Flat Tempered 5 mm M² 332,000 185,000 9,250 194,250
42 Kaca Flat Tempered 6 mm M² 372,000 247,000 12,350 259,350
43 Kaca Flat Tempered 8 mm M² 497,500 323,000 16,150 339,150
44 Kaca Flat Tempered 10 mm M² 637,000 398,000 19,900 417,900
45 Kaca Flat Tempered 12 mm M² 1,550,000 466,000 23,300 489,300
46 Kaca Flat Tempered 15 mm M² 3,500,000 2,900,000 145,000 3,045,000
47 Kaca Curved Tempered 5 mm M² 288,750 275,000 13,750 288,750
48 Kaca Curved Tempered 6 mm M² 323,400 308,000 15,400 323,400
49 Kaca Curved Tempered 8 mm M² 432,600 412,000 20,600 432,600
50 Kaca Curved Tempered 10 mm M² 554,400 528,000 26,400 554,400
51 Kaca Curved Tempered 12 mm M² 663,600 632,000 31,600 663,600
52 Kaca Curved Tempered 15 mm M² 3,045,000 2,900,000 145,000 3,045,000
53 Kaca Cermin 2 mm 122 x 51 Lembar 42,000 35,000 7,000 42,000
54 Kaca Cermin 3 mm M² 102,000 85,000 17,000 102,000
55 Kaca Cermin 5 mm M² 150,000 125,000 25,000 150,000
56 Kaca Riben 3 mm M² 78,000 65,000 13,000 78,000
57 Kaca Riben 5 mm M² 102,000 85,000 17,000 102,000
58 Kaca Warna (biru, hijau) 5 mm M² 114,000 95,000 19,000 114,000
76,360 15,272 91,632
V BAHAN PIPA 136,030 27,206 163,236
W PIPA AIR BERSIH 166,580 33,316 199,896
1. Pipa PVC RRJ 6 m' S - 10 " maspion " 2" Batang 205,300 PU. Bina Marga 154,300 7,715 162,015
Pipa PVC RRJ 6 m' S - 10 " maspion " 2 1/2" Batang 287,100 217,600 10,880 228,480
Pipa PVC RRJ 6 m' S - 10 " maspion " 3" Batang 406,800 304,800 15,240 320,040
Pipa PVC RRJ 6 m' S - 10 " maspion " 4" Batang 607,500 455,500 22,775 478,275
Pipa PVC RRJ 6 m' S - 10 " maspion " 6" Batang 1,264,200 948,400 47,420 995,820
Pipa PVC RRJ 6 m' S - 10 " maspion " 8" Batang 2,015,700 1,544,200 77,210 1,621,410
Pipa PVC RRJ 6 m' S - 10 " maspion " 10" Batang 3,119,400 2,394,400 119,720 2,514,120
Pipa PVC RRJ 6 m' S - 10 " maspion " 12" Batang 4,944,300 3,794,400 189,720 3,984,120
Pipa PVC RRJ 6 m' S - 10 " maspion " 14" Batang 6,376,500 4,892,200 244,610 5,136,810
Pipa PVC RRJ 6 m' S - 10 " maspion " 16" Batang 8,104,700 6,213,200 310,660 6,523,860
2 Pipa PVC moof 6 m' S - 10 " maspion " 1" Batang 53,600 37,900 1,895 39,795
Pipa PVC moof 6 m' S - 10 " maspion " 1 1/4" Batang 77,900 56,200 2,810 59,010
Pipa PVC moof 6 m' S - 10 " maspion " 1 1/2" Batang 122,200 91,100 4,555 95,655
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Pipa PVC moof 6 m' S - 10 " maspion " 2" Batang 192,100 149,300 7,465 156,765
Pipa PVC moof 6 m' S - 10 " maspion " 2 1/2" Batang 270,300 211,600 10,580 222,180
Pipa PVC moof 6 m' S - 10 " maspion " 3" Batang 390,100 305,200 15,260 320,460
Pipa PVC moof 6 m' S - 10 " maspion " 4" Batang 585,600 459,500 22,975 482,475
Pipa PVC moof 6 m' S - 10 " maspion " 6" Batang 1,232,100 972,200 48,610 1,020,810
Pipa PVC moof 6 m' S - 10 " maspion " 8" Batang 1,967,200 1,585,800 79,290 1,665,090
Pipa PVC moof 6 m' S - 10 " maspion " 10" Batang 3,054,400 2,849,800 142,490 2,992,290
Pipa PVC moof 6 m' S - 10 " maspion " 12" Batang 4,861,800 4,538,000 226,900 4,764,900
3. Pipa PVC RRJ 6 m' S - 12,5 " maspion 2" Batang 180,900 127,300 6,365 133,665
Pipa PVC RRJ 6 m' S - 12,5 " maspion 2 1/2" Batang 238,000 180,300 9,015 189,315
Pipa PVC RRJ 6 m' S - 12,5 " maspion 3" Batang 352,700 252,800 12,640 265,440
Pipa PVC RRJ 6 m' S - 12,5 " maspion 4" Batang 495,000 370,700 18,535 389,235
Pipa PVC RRJ 6 m' S - 12,5 " maspion 6" Batang 1,037,200 777,800 38,890 816,690
Pipa PVC RRJ 6 m' S - 12,5 " maspion 8" Batang 1,642,000 1,258,100 62,905 1,321,005
Pipa PVC RRJ 6 m' S - 12,5 " maspion 10" Batang 2,600,600 1,961,300 98,065 2,059,365
Pipa PVC RRJ 6 m' S - 12,5 " maspion 12" Batang 4,042,800 3,104,500 155,225 3,259,725
Pipa PVC RRJ 6 m' S - 12,5 " maspion 14" Batang 5,245,800 4,026,600 201,330 4,227,930
Pipa PVC RRJ 6 m' S - 12,5 " maspion 16" Batang 6,632,000 5,085,700 254,285 5,339,985
4. Pipa PVC moof 6 m' S - 12,5 " maspion 1/2" Batang 39,342 23,400 1,170 24,570
Pipa PVC moof 6 m' S - 12,5 " maspion 3/4" Batang 62,365 37,000 1,850 38,850
Pipa PVC moof 6 m' S - 12,5 " maspion 1" Batang 70,714 42,000 2,100 44,100
Pipa PVC moof 6 m' S - 12,5 " maspion 1 1/2" Batang 106,100 84,100 4,205 88,305
Pipa PVC moof 6 m' S - 12,5 " maspion 2" Batang 156,400 113,800 5,690 119,490
Pipa PVC moof 6 m' S - 12,5 " maspion 2 1/2" Batang 221,700 163,300 8,165 171,465
Pipa PVC moof 6 m' S - 12,5 " maspion 3" Batang 321,700 236,500 11,825 248,325
Pipa PVC moof 6 m' S - 12,5 " maspion 4" Batang 474,000 349,500 17,475 366,975
Pipa PVC moof 6 m' S - 12,5 " maspion 6" Batang 1,006,900 747,800 37,390 785,190
Pipa PVC moof 6 m' S - 12,5 " maspion 8" Batang 1,596,000 1,212,100 60,605 1,272,705
Pipa PVC moof 6 m' S - 12,5 " maspion 10" Batang 2,538,800 1,899,800 94,990 1,994,790
Pipa PVC moof 6 m' S - 12,5 " maspion 12" Batang 3,964,200 3,025,300 151,265 3,176,565
5 Pipa PVC RRJ 6 m' S - 10 " Langgeng 2" Batang 242,100 151,600 7,580 159,180
Pipa PVC RRJ 6 m' S - 10 " Langgeng 2 1/2" Batang 344,700 212,700 10,635 223,335
Pipa PVC RRJ 6 m' S - 10 " Langgeng 3" Batang 484,000 300,200 15,010 315,210
Pipa PVC RRJ 6 m' S - 10 " Langgeng 4" Batang 722,800 443,800 22,190 465,990
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Pipa PVC RRJ 6 m' S - 10 " Langgeng 6" Batang 1,505,100 922,400 46,120 968,520
Pipa PVC RRJ 6 m' S - 10 " Langgeng 8" Batang 2,442,200 1,536,900 76,845 1,613,745
Pipa PVC RRJ 6 m' S - 10 " Langgeng 10" Batang 3,801,300 2,382,000 119,100 2,501,100
Pipa PVC RRJ 6 m' S - 10 " Langgeng 11" Batang 4,803,500 3,014,600 150,730 3,165,330
Pipa PVC RRJ 6 m' S - 10 " Langgeng 12" Batang 6,031,700 3,771,000 188,550 3,959,550
Pipa PVC RRJ 6 m' S - 10 " Langgeng 14" Batang 7,757,600 5,400,100 270,005 5,670,105
Pipa PVC RRJ 6 m' S - 10 " Langgeng 16" Batang 10,041,100 6,852,900 342,645 7,195,545
6. Pipa PVC moof 6 m' S - 10 " Langgeng 3/4" Batang 41,360 22,000 1,100 23,100
Pipa PVC moof 6 m' S - 10 " Langgeng 1" Batang 62,100 37,800 1,890 39,690
Pipa PVC moof 6 m' S - 10 " Langgeng 1 1/4" Batang 92,000 56,200 2,810 59,010
Pipa PVC moof 6 m' S - 10 " Langgeng 1 1/2" Batang 145,500 88,600 4,430 93,030
Pipa PVC moof 6 m' S - 10 " Langgeng 2" Batang 223,400 136,000 6,800 142,800
Pipa PVC moof 6 m' S - 10 " Langgeng 2 1/2" Batang 318,700 193,300 9,665 202,965
Pipa PVC moof 6 m' S - 10 " Langgeng 3" Batang 455,300 278,400 13,920 292,320
Pipa PVC moof 6 m' S - 10 " Langgeng 4" Batang 688,700 419,400 20,970 440,370
Pipa PVC moof 6 m' S - 10 " Langgeng 6" Batang 1,455,000 887,800 44,390 932,190
Pipa PVC moof 6 m' S - 10 " Langgeng 8" Batang 2,375,800 1,482,500 74,125 1,556,625
Pipa PVC moof 6 m' S - 10 " Langgeng 10" Batang 3,713,200 2,309,400 115,470 2,424,870
Pipa PVC moof 6 m' S - 10 " Langgeng 11" Batang 5,158,120 2,921,600 146,080 3,067,680
Pipa PVC moof 6 m' S - 10 " Langgeng 12" Batang 5,909,500 3,677,900 183,895 3,861,795
7 Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 2" Batang 201,100 125,500 6,275 131,775
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 2 1/2" Batang 286,900 177,100 8,855 185,955
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 3" Batang 405,900 249,900 12,495 262,395
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 4" Batang 586,000 362,200 18,110 380,310
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 6" Batang 1,232,100 758,100 37,905 796,005
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 8" Batang 1,995,900 1,253,900 62,695 1,316,595
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 10" Batang 3,123,300 1,954,100 97,705 2,051,805
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 11" Batang 4,015,750 2,450,000 122,500 2,572,500
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 12" Batang 4,960,500 3,089,000 154,450 3,243,450
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 14" Batang 6,495,300 4,004,300 200,215 4,204,515
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng 16" Batang 8,194,700 5,614,100 280,705 5,894,805
8 Pipa PVC moof 6 m' S - 12,5 " Langgeng 1/2" Batang 22,100 13,600 680 14,280
Pipa PVC moof 6 m' S - 12,5 " Langgeng 3/4" Batang 33,300 20,500 1,025 21,525
Pipa PVC moof 6 m' S - 12,5 " Langgeng 1" Batang 52,800 32,500 1,625 34,125
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Pipa PVC moof 6 m' S - 12,5 " Langgeng 1 1/4" Batang 85,000 49,900 2,495 52,395
Pipa PVC moof 6 m' S - 12,5 " Langgeng 1 1/2" Batang 124,500 76,400 3,820 80,220
Pipa PVC moof 6 m' S - 12,5 " Langgeng 2" Batang 182,800 110,200 5,510 115,710
Pipa PVC moof 6 m' S - 12,5 " Langgeng 2 1/2" Batang 261,400 512,000 25,600 537,600
Pipa PVC moof 6 m' S - 12,5 " Langgeng 3" Batang 377,900 228,800 11,440 240,240
Pipa PVC moof 6 m' S - 12,5 " Langgeng 4" Batang 553,000 338,600 16,930 355,530
Pipa PVC moof 6 m' S - 12,5 " Langgeng 6" Batang 1,183,400 724,500 36,225 760,725
Pipa PVC moof 6 m' S - 12,5 " Langgeng 8" Batang 1,932,200 1,201,600 60,080 1,261,680
Pipa PVC moof 6 m' S - 12,5 " Langgeng 10" Batang 3,038,300 1,884,000 94,200 1,978,200
Pipa PVC moof 6 m' S - 12,5 " Langgeng 11" Batang 3,903,000 2,360,300 118,015 2,478,315
Pipa PVC moof 6 m' S - 12,5 " Langgeng 12" Batang 4,843,100 2,998,700 149,935 3,148,635
9. Pipa PVC RRJ 6 m' S - 10 " Supralon " 2" Batang 231,900 134,700 6,735 141,435
Pipa PVC RRJ 6 m' S - 10 " Supralon " 2 1/2" Batang 327,800 189,000 9,450 198,450
Pipa PVC RRJ 6 m' S - 10 " Supralon " 3" Batang 460,800 264,500 13,225 277,725
Pipa PVC RRJ 6 m' S - 10 " Supralon " 4" Batang 686,800 396,200 19,810 416,010
Pipa PVC RRJ 6 m' S - 10 " Supralon " 6" Batang 1,423,700 821,900 41,095 862,995
Pipa PVC RRJ 6 m' S - 10 " Supralon " 8" Batang 2,302,600 1,337,200 66,860 1,404,060
Pipa PVC RRJ 6 m' S - 10 " Supralon " 10" Batang 3,576,000 2,072,800 103,640 2,176,440
Pipa PVC RRJ 6 m' S - 10 " Supralon " 12" Batang 5,666,900 3,282,500 164,125 3,446,625
Pipa PVC RRJ 6 m' S - 10 " Supralon " 14" Batang 7,286,100 4,225,300 211,265 4,436,565
Pipa PVC RRJ 6 m' S - 10 " Supralon " 16" Batang 9,426,600 5,370,800 268,540 5,639,340
10. Pipa PVC moof 6 m' S - 10 " Supralon " 1/2" Batang 25,410 13,200 660 13,860
Pipa PVC moof 6 m' S - 10 " Supralon " 3/4" Batang 37,620 19,600 980 20,580
Pipa PVC moof 6 m' S - 10 " Supralon " 1" Batang 60,800 33,700 1,685 35,385
Pipa PVC moof 6 m' S - 10 " Supralon " 1 1/4" Batang 88,700 50,200 2,510 52,710
Pipa PVC moof 6 m' S - 10 " Supralon " 1 1/2" Batang 139,400 79,000 3,950 82,950
Pipa PVC moof 6 m' S - 10 " Supralon " 2" Batang 214,400 121,800 6,090 127,890
Pipa PVC moof 6 m' S - 10 " Supralon " 2 1/2" Batang 303,500 172,600 8,630 181,230
Pipa PVC moof 6 m' S - 10 " Supralon " 3" Batang 434,000 248,500 12,425 260,925
Pipa PVC moof 6 m' S - 10 " Supralon " 4" Batang 655,000 374,300 18,715 393,015
Pipa PVC moof 6 m' S - 10 " Supralon " 6" Batang 1,376,900 792,200 39,610 831,810
Pipa PVC moof 6 m' S - 10 " Supralon " 8" Batang 2,240,500 1,291,800 64,590 1,356,390
Pipa PVC moof 6 m' S - 10 " Supralon " 10" Batang 3,493,700 2,012,000 100,600 2,112,600
Pipa PVC moof 6 m' S - 10 " Supralon " 12" Batang 5,552,600 3,204,600 160,230 3,364,830
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
11. Pipa PVC RRJ 6 m' S - 12,5 " Supralon 2" Batang 193,600 116,800 5,840 122,640
Pipa PVC RRJ 6 m' S - 12,5 " Supralon 2 1/2" Batang 273,800 165,200 8,260 173,460
Pipa PVC RRJ 6 m' S - 12,5 " Supralon 3" Batang 387,700 230,900 11,545 242,445
Pipa PVC RRJ 6 m' S - 12,5 " Supralon 4" Batang 558,900 338,400 16,920 355,320
Pipa PVC RRJ 6 m' S - 12,5 " Supralon 6" Batang 1,168,400 708,600 35,430 744,030
Pipa PVC RRJ 6 m' S - 12,5 " Supralon 8" Batang 1,852,900 1,145,100 57,255 1,202,355
Pipa PVC RRJ 6 m' S - 12,5 " Supralon 10" Batang 2,891,400 1,784,900 89,245 1,874,145
Pipa PVC RRJ 6 m' S - 12,5 " Supralon 12" Batang 4,584,700 2,822,200 141,110 2,963,310
Pipa PVC RRJ 6 m' S - 12,5 " Supralon 14" Batang 6,000,300 3,659,100 182,955 3,842,055
Pipa PVC RRJ 6 m' S - 12,5 " Supralon 16" Batang 7,567,100 4,618,500 230,925 4,849,425
12. Pipa PVC moof 6 m' S - 12,5 " Supralon 1/2" Batang 20,700 12,900 645 13,545
Pipa PVC moof 6 m' S - 12,5 " Supralon 3/4" Batang 31,100 19,300 965 20,265
Pipa PVC moof 6 m' S - 12,5 " Supralon 1" Batang 49,400 30,400 1,520 31,920
Pipa PVC moof 6 m' S - 12,5 " Supralon 1 1/4" Batang 85,000 46,900 2,345 49,245
Pipa PVC moof 6 m' S - 12,5 " Supralon 1 1/2" Batang 119,700 71,600 3,580 75,180
Pipa PVC moof 6 m' S - 12,5 " Supralon 2" Batang 176,500 103,200 5,160 108,360
Pipa PVC moof 6 m' S - 12,5 " Supralon 2 1/2" Batang 250,000 148,100 7,405 155,505
Pipa PVC moof 6 m' S - 12,5 " Supralon 3" Batang 361,600 214,400 10,720 225,120
Pipa PVC moof 6 m' S - 12,5 " Supralon 4" Batang 528,100 317,200 15,860 333,060
Pipa PVC moof 6 m' S - 12,5 " Supralon 6" Batang 1,122,900 678,700 33,935 712,635
Pipa PVC moof 6 m' S - 12,5 " Supralon 8" Batang 1,825,800 1,099,200 54,960 1,154,160
Pipa PVC moof 6 m' S - 12,5 " Supralon 10" Batang 2,862,800 1,723,300 86,165 1,809,465
Pipa PVC moof 6 m' S - 12,5 " Supralon 12" Batang 4,555,600 2,743,200 137,160 2,880,360
12.1 Pipa PVC moof 6 m' S - 10 " Triliun" 1" Batang 52,300
Pipa PVC moof 6 m' S - 10 " Triliun" 1 1/2" Batang 119,000
Pipa PVC moof 6 m' S - 10 " Triliun" 2" Batang 187,000
Pipa PVC moof 6 m' S - 10 " Triliun" 2 1/2" Batang 262,800
Pipa PVC moof 6 m' S - 10 " Triliun" 3" Batang 378,900
Pipa PVC moof 6 m' S - 10 " Triliun" 4" Batang 567,700
Pipa PVC moof 6 m' S - 10 " Triliun" 6" Batang 1,189,700
Pipa PVC moof 6 m' S - 10 " Triliun" 8" Batang 1,450,000
12.2 Pipa PVC RRJ 6 m' S - 12,5 " Triliun" 2" Batang 164,700
Pipa PVC RRJ 6 m' S - 12,5 " Triliun" 2 1/2" Batang 231,200
Pipa PVC RRJ 6 m' S - 12,5 " Triliun" 3" Batang 326,900
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Pipa PVC RRJ 6 m' S - 12,5 " Triliun" 4" Batang 478,300
Pipa PVC RRJ 6 m' S - 12,5 " Triliun" 6" Batang 997,200
Pipa PVC RRJ 6 m' S - 12,5 " Triliun" 8" Batang 1,574,500
12.3 Pipa PVC moof 6 m' S - 12,5 " Triliun " 1 1/2" Batang 103,400
Pipa PVC moof 6 m' S - 12,5 " Triliun " 2" Batang 152,200
Pipa PVC moof 6 m' S - 12,5 " Triliun " 2 1/2" Batang 215,600
Pipa PVC moof 6 m' S - 12,5 " Triliun " 3" Batang 312,500
Pipa PVC moof 6 m' S - 12,5 " Triliun " 4" Batang 459,800
Pipa PVC moof 6 m' S - 12,5 " Triliun " 6" Batang 972,600
Pipa PVC moof 6 m' S - 12,5 " Triliun " 8" Batang 1,536,200
12.4 Pipa PVC RRJ 6 m' S - 10 " Wavin " 2" Batang 216,378
Pipa PVC RRJ 6 m' S - 10 " Wavin " 3" Batang 443,005
Pipa PVC RRJ 6 m' S - 10 " Wavin " 4" Batang 665,123
Pipa PVC RRJ 6 m' S - 10 " Wavin " 6" Batang 1,395,743
Pipa PVC RRJ 6 m' S - 10 " Wavin " 8" Batang 2,174,743
Pipa PVC RRJ 6 m' S - 10 " Wavin " 10" Batang 3,377,785
Pipa PVC RRJ 6 m' S - 10 " Wavin " 12" Batang 5,378,585
Pipa PVC RRJ 6 m' S - 10 " Wavin " 16" Batang 8,739,048
Pipa PVC moof 6 m' S - 10 " Wavin " 2" Batang 212,790
Pipa PVC moof 6 m' S - 10 " Wavin " 3" Batang 431,730
Pipa PVC moof 6 m' S - 10 " Wavin " 4" Batang 649,235
Pipa PVC moof 6 m' S - 10 " Wavin " 6" Batang 1,378,420
12.5 Pipa PVC RRJ 6 m' S - 12,5 " Wavin " 2" Batang 178,145
Pipa PVC RRJ 6 m' S - 12,5 " Wavin " 3" Batang 363,465
Pipa PVC RRJ 6 m' S - 12,5 " Wavin " 4" Batang 537,100
Pipa PVC RRJ 6 m' S - 12,5 " Wavin " 6" Batang 1,145,335
Pipa PVC RRJ 6 m' S - 12,5 " Wavin " 8" Batang 1,767,408
Pipa PVC RRJ 6 m' S - 12,5 " Wavin " 10" Batang 2,758,275
Pipa PVC RRJ 6 m' S - 12,5 " Wavin " 12" Batang 4,405,450
Pipa PVC RRJ 6 m' S - 12,5 " Wavin " 16" Batang 7,083,058
Pipa PVC moof 6 m' S - 12,5 " Wavin " 2" Batang 172,200
Pipa PVC moof 6 m' S - 12,5 " Wavin " 3" Batang 359,980
Pipa PVC moof 6 m' S - 12,5 " Wavin " 4" Batang 522,648
Pipa PVC moof 6 m' S - 12,5 " Wavin " 6" Batang 1,121,248
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
13 Pipa Air Gl Ø 1/2" 1,5 mm Batang 131,250 125,000 6,250 131,250
1,8 mm Batang 148,750 141,700 7,085 148,785
2,0 mm Batang 166,300 158,400 7,920 166,320
2,2 mm Batang 192,450 183,300 9,165 192,465
14 Pipa Air Gl Ø 3/4" 1,5 mm Batang 157,350 149,900 7,495 157,395
1,8 mm Batang 192,450 183,300 9,165 192,465
2,0 mm Batang 209,850 199,900 9,995 209,895
2,2 mm Batang 244,850 233,200 11,660 244,860
15 Pipa Air Gl Ø 1" 1,8 mm Batang 236,250 225,000 11,250 236,250
2,0 mm Batang 262,350 249,900 12,495 262,395
2,3 mm Batang 297,350 283,200 14,160 297,360
2,5 mm Batang 323,700 308,300 15,415 323,715
2,8 mm Batang 367,250 349,800 17,490 367,290
16 Pipa Air Gl Ø 1 1/4" 1,8 mm Batang 330,600 314,900 15,745 330,645
2,3 mm Batang 367,250 349,800 17,490 367,290
2,8 mm Batang 528,150 503,000 25,150 528,150
17 Pipa Air Gl Ø 1 1/2" 1,8 mm Batang 349,850 333,200 16,660 349,860
2,0 mm Batang 384,800 366,500 18,325 384,825
2,3 mm Batang 446,000 424,800 21,240 446,040
2,5 mm Batang 481,100 458,200 22,910 481,110
2,8 mm Batang 542,200 516,400 25,820 542,220
18 Pipa Air Gl Ø 2" 1,8 mm Batang 515,950 416,400 20,820 437,220
2,0 mm Batang 577,900 466,400 23,320 489,720
2,3 mm Batang 650,340 524,800 26,240 551,040
2,5 mm Batang 712,290 574,800 28,740 603,540
2,8 mm Batang 794,790 641,400 32,070 673,470
19 Pipa Air Gl Ø 2 1/2" 2,3 mm Batang 836,090 674,700 33,735 708,435
2,5 mm Batang 908,210 732,900 36,645 769,545
2,8 mm Batang 1,011,470 816,200 40,810 857,010
3,0 mm Batang 1,042,390 841,200 42,060 883,260
20 Pipa Air Gl Ø 3" 2,0 mm Batang 846,260 683,000 34,150 717,150
2,3 mm Batang 959,790 774,600 38,730 813,330
2,5 mm Batang 1,032,120 832,900 41,645 874,545
2,8 mm Batang 1,156,020 932,900 46,645 979,545
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
3,0 mm Batang 1,238,630 999,500 49,975 1,049,475
21 Pipa Air Gl Ø 4" 2,3 mm Batang 1,238,630 999,500 49,975 1,049,475
2,5 mm Batang 1,352,150 1,091,100 54,555 1,145,655
2,8 mm Batang 1,517,260 1,224,400 61,220 1,285,620
3,0 mm Batang 1,620,620 1,307,700 65,385 1,373,085
3,3 mm Batang 1,785,720 1,440,900 72,045 1,512,945
22 Pipa Air Gl Ø 6" 2,5 mm Batang 1,971,680 1,591,000 79,550 1,670,550
2,8 mm Batang 2,208,900 1,782,400 89,120 1,871,520
3,0 mm Batang 2,363,730 1,907,400 95,370 2,002,770
3,3 mm Batang 2,601,060 2,098,900 104,945 2,203,845
3,5 mm Batang 2,756,100 2,223,900 111,195 2,335,095
23 Pipa Air Gl Ø 8" Medium Batang 3,682,940 4,664,300 233,215 4,897,515
24 Pipa Air Gl Ø 6" Medium Batang 6,646,600 6,330,100 316,505 6,646,605
25 Pipa Air Gl Ø 6" Medium Batang 8,955,450 8,529,000 426,450 8,955,450
26 Pipa Air Gl Ø 6" Medium Batang 10,039,950 9,561,900 478,095 10,039,995
27 Pipa Air Gl 0 1" Meter 56,600 47,200 9,440 56,640
28 Pipa Air Gl 0 1.5" Meter 91,600 76,360 15,272 91,632
29 Pipa Air Gl 0 2.5" Meter 163,200 136,030 27,206 163,236
30 Pipa Air Gl 0 3" Meter 199,850 166,580 33,316 199,896
31 Pipa PVC 11/4" Batang 67,400 56,200 11,240 67,440
32 Kenie 11/4" Buah 6,450 5,400 1,080 6,480
33 Pipa Air Gl Ø 10" medium Batang 5,708,550 Dinas Pengairan
34 Pipa Air Gl Ø 12" medium Batang 7,845,020
35 Pipa Air Gl Ø 13" medium Batang 10,570,100
36 Pipa Air Gl Ø 14" medium Batang 11,850,250
1,289,000 64,450 1,353,450
X PIPA SANITASI 1,842,800 92,140 1,934,940
27 Pipa PVC 1 1/2" merek mASPION AW m' 21,200 3,644,000 182,200 3,826,200
28 Pipa PVC 1 1/4" merek mASPION AW m' 16,350 6,142,700 307,135 6,449,835
29 Pipa PVC 1" merek mASPION AW m' 11,400 8,849,700 442,485 9,292,185
30 Pipa PVC 1/2" merek mASPION AW m' 7,450 9,890,800 494,540 10,385,340
31 Pipa PVC 2 1/2 " merek mASPION AW m' 40,400 20,302,200 1,015,110 21,317,310
32 Pipa PVC 2" merek mASPION AW m' 31,150 27,876,500 1,393,825 29,270,325
33 Pipa PVC 3" merek mASPION AW m' 57,300 87,600 4,380 91,980
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
34 Pipa PVC 3/4" merek mASPION AW m' 9,100 129,000 6,450 135,450
35 Pipa PVC 4" merek mASPION AW m' 84,200 189,000 9,450 198,450
36 Pipa PVC 5" merek mASPION AW m' 132,600 297,700 14,885 312,585
37 Pipa PVC 6" merek mASPION AW m' 175,000 406,000 20,300 426,300
38 Pipa PVC 8" AW Maspion m' 257,000 586,500 29,325 615,825
39 Pipa PVC 10" AW Maspion m' 356,500 830,200 41,510 871,710
40 Sock Drat Luar Buah 122,850 1,010,600 50,530 1,061,130
41 Sok PVC 1 1/2" merek mASPION AW Buah 3,550 1,407,700 70,385 1,478,085
42 Sok PVC 1 1/4" merek mASPION AW Buah 3,350 101,100 5,055 106,155
43 Sok PVC 1" merek mASPION AW Buah 2,900 148,900 7,445 156,345
44 Sok PVC 2 1/2 " merek mASPION AW Buah 6,900 218,200 10,910 229,110
45 Sok PVC 2" merek mASPION AW Buah 4,700 389,300 19,465 408,765
46 Sok PVC 3" merek mASPION AW Buah 11,750 530,900 26,545 557,445
47 Sok PVC 3/4" merek mASPION AW Buah 2,200 767,000 38,350 805,350
48 Sok PVC 4" merek mASPION AW Buah 23,300 1,085,600 54,280 1,139,880
49 Sok PVC 1/2" merek mASPION AW Buah 1,150 1,321,600 66,080 1,387,680
50 Stop Kran Ø 1 1/2 " Buah 21,900 1,840,800 92,040 1,932,840
51 Stop Kran Ø 2 " Buah 204,750 101,000 5,050 106,050
52 Stop Kran Ø 3 " Buah 217,750 148,900 7,445 156,345
53 T PVC 1 1/2" merek mASPION AW Buah 5,450 218,100 10,905 229,005
54 T PVC 1 1/4" merek mASPION AW Buah 3,950 343,600 17,180 360,780
55 T PVC 1" merek mASPION AW Buah 3,550 468,600 23,430 492,030
56 T PVC 2 1/2 " merek mASPION AW Buah 15,300 676,700 33,835 710,535
57 T PVC 2" merek mASPION AW Buah 10,900 957,900 47,895 1,005,795
58 T PVC 3" merek mASPION AW Buah 26,250 1,166,100 58,305 1,224,405
59 T PVC 3/4" merek mASPION AW Buah 2,900 1,624,200 81,210 1,705,410
60 T PVC 4" merek mASPION AW Buah 48,800 1,443,800 72,190 1,515,990
61 T PVC 5" merek mASPION AW Buah 120,600 2,255,800 112,790 2,368,590
62 T PVC 6" merek mASPION AW Buah 205,550 2,977,700 148,885 3,126,585
63 T PVC 8" merek mASPION AW Buah 438,250 4,421,300 221,065 4,642,365
64 T PVC 1/2" merek mASPION AW Buah 1,550 7,579,500 378,975 7,958,475
65 Stop kran 1" Buah 35,550 4,400 220 4,620
67 Selang 5/8" m' 5,850 9,100 455 9,555
68 Springkle Buah 100,550 14,600 730 15,330
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
18,000 900 18,900
Z ASSESORIS PIPA 28,500 1,425 29,925
1 Baut mur 5/8 x 2" Buah - 3,700 185 3,885
2 Baut mur 5/8 x 2 1/2" Buah - 4,000 200 4,200
3 Baut mur 5/8 x 3" Buah - 4,400 220 4,620
4 Baut mur 5/8 x 4" Buah - 4,900 245 5,145
5 Baut mur 3/4 x 2 1/2" Buah - 7,700 385 8,085
6 Baut mur 3/4 x 3" Buah - 9,900 495 10,395
496 Plendes Set 275,400 229,500 45,900 275,400

AA BAHAN BESI BESI BETON (BB) 55,157,300 2,757,865 57,915,165


32 Alluminium strip m' 30,850 29,400 1,470 30,870
34.1 Besi Naco 12 Mili Lonjor 65,000
14 Mili Lonjor 95,000
19 Mili Lonjor 175,000
34.2 Besi Plat Strip 2,5 Cm Lonjor 45,000
3 Cm Lonjor 75,000
5 Cm Lonjor 95,000
35 Besi bulat st 60 Kg 20,550 19,600 980 20,580
36 Besi Canal Kg 16,000 12,000 600 12,600
37 Besi kanal U 50 mm Batng 279,900 266,600 13,330 279,930
38 Besi plat 5 mm x 4 ft x 8 ft Lembar 1,632,500 1,554,800 77,740 1,632,540
39 Besi plate Kg 19,300 18,400 920 19,320
40 Besi plate strip Kg 19,300 18,400 920 19,320
45 Baja WF Jembatan (Finish Galvanis) kg 32,775
47 Besi siku L 30.30.3 Kg 12,700 12,100 605 12,705
48 Besi siku L 60 x 60 X 6 Kg 12,700 12,100 605 12,705
49 Besi strip 2 cm Kg 20,450 19,500 975 20,475
50 Besi strip 5/8 x 3 Kg 10,250 9,800 490 10,290
54 Casement Handel Dekkson buah 33,500
58 Pipa Besi Galvanis 3/4 ( Pipa) Mtr 40,200 38,300 1,915 40,215
59 Pipa galvanis 1,5 " Meter 56,150 53,500 2,675 56,175
60 Pipa Galvanis 1" Batang 221,400 210,900 10,545 221,445
61 Pipa Galvanis 1,25" Batang 258,900 246,600 12,330 258,930
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
62 Pipa Besi Q 8" Meter 598,500 570,000 28,500 598,500
63 Pipa Besi Q 6" Meter 315,000 300,000 15,000 315,000
64 Pipa Besi Q 5" Meter 210,000 200,000 10,000 210,000
65 Pipa Besi Q 2,5" Meter 115,500 110,000 5,500 115,500
66 Pipa Besi Q 2" Meter 42,000 40,000 2,000 42,000
67 Pipa Besi Q 1,25" Meter 36,750 35,000 1,750 36,750
68 Plat Uk 1.2 Mm M 196,350 187,000 9,350 196,350
69 Plat Tutup Pipa 6" Buah 21,000 20,000 1,000 21,000
70 Plat Tutup Pipa 8" Buah 52,500 50,000 2,500 52,500
71 Plat Tutup Pipa 2,5" Buah 10,500 10,000 500 10,500
72 Plendes 45 Cm X 45 Cm X 2 Cm Buah 210,000 200,000 10,000 210,000
73 Plendes 50 Cm X 50 Cm X 2 Cm Buah 315,000 300,000 15,000 315,000
74 Plat Gerbil 25 Cm X 13 Cm X 0,8 Cm Buah 42,000 40,000 2,000 42,000
75 Plat Gerbil 15 Cm X 18 Cm X 0,8 Cm Buah 31,500 30,000 1,500 31,500
Pasang pintu kaca tbl 10 - 12 mm dgn
76 m² 1,962,100
engsel tanam
Pintu Swing Silver + Kaca Polos 5 mm,
77 m2 1,293,750
Floor Hinge Dorma BTS 84
Pintu Swing Coklat + Kaca Polos 5
78 m2 1,437,500
mm, Floor Hinge Dorma BTS 84
Pintu Frameless (Tempered 12 mm
79 m2 1,900,000
polos) floor hinge dorma BTS
Pintu Frameless (Tempered 12 mm
80 m2 2,075,000
rayban) floor hinge dorma BTS
81 Pintu Swing + Kaca Polos 5 mm m2 645,000
83 Patch Fitting Dekkson buah 550,000
Daun pintu aluminium 8 cm ( kaca 8
84 m' 165,250
mm ) coklat
Daun pintu aluminium 8 cm ( kaca 8
85 m' 154,750 147,400 7,370 154,770
mm ) perak
86 Kawat berduri m' 1,850 1,800 90 1,890
87 Kusen aluminium 4" coklat m' 123,900 118,000 5,900 123,900
88 Kusen aluminium 4" perak m' 113,600 108,200 5,410 113,610
89 Kusen Aluminium 4" (YKK) m' 138,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
90 Jendela Sliding Silver uk. 60 x 120 + Kaca Polos 5 mm m2 635,000
91 Jendela Sliding Coklat uk. 60 x 120 + Kaca Polos 5 mm m2 718,750
92 Jendela Casement Silver uk. 60 x 120 + Kaca Polos 5 mm m2 595,000
93 Jendela Casement Coklat uk. 60 x 120 + Kaca Polos 5 mm m2 550,000
94 Roling door Aluminium m² 722,800 688,400 34,420 722,820
Roling door Aluminium + ongkos
95 m² 826,100 786,800 39,340 826,140
pasang
96 Sunscreen Aluminium ( non kusen ) m' 33,050 31,500 1,575 33,075
97 Sok Drat Galvanis 1 " Buah 5,450 5,200 260 5,460
98 Sok Drat Galvanis 3/4 " Buah 4,200 4,000 200 4,200
99 Sok Drat PVC 3/4 Buah 1,550 1,500 75 1,575
101 Timah hitam Kg 172,200 164,000 8,200 172,200
102 mur baut ¼" x 1½" Buah 1,150 1,100 55 1,155
103 Baut 19 Mm Buah 31,500 30,000 1,500 31,500
104 Kerangka Besi T. 40 Unit 1,749,050 1,665,800 83,290 1,749,090
105 Warmes 2.4 x 5.1 (8 mm) 2,10 x 5,10 Roll 654,150 623,000 31,150 654,150
- -
BB BAHAN KAWAT - -
1 Elektroda/kawat las listrik Kg 30,850 29,400 1,470 30,870
2 Jendela Naco Daun 52,900 50,400 2,520 52,920
3 Jendela Naco Unit 350,150 333,500 16,675 350,175
4 Kawat dari 40 m/Roll besar Roll 109,600 104,400 5,220 109,620
5 Kawat dari 40 m/Roll kecil m 101,500 96,700 4,835 101,535
10 Kawat ikat untuk bronjong Kg 20,050 21,700 19,100 955 20,055
Fabrikasi Diameter 3
13 Kawat Beronjong Unit 278,250 265,000 13,250 278,250
mm Uk. 2x1x0,5 m

CC BAHAN BETON CETAKAN - -


1 Buis beton diameter 15 cm Buah 23,400 22,300 1,115 23,415
2 Buis beton diameter 20 cm Buah 33,900 32,300 1,615 33,915
3 Buis beton diameter 30 cm Buah 42,500 40,500 2,025 42,525
4 Buis beton diameter 40 cm Buah 46,600 44,400 2,220 46,620
5 Buis beton diameter 50 cm Buah 57,300 54,600 2,730 57,330
6 Buis beton U 15 cm Buah 27,150 25,900 1,295 27,195
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
7 Buis beton U 20 cm Buah 36,000 34,300 1,715 36,015
8 Buis beton U 30 cm Buah 46,600 44,400 2,220 46,620
9 Buis beton U 40 cm Buah 64,550 61,500 3,075 64,575
10 Buis beton U 50 cm Buah 57,300 54,600 2,730 57,330
11 Buis beton U 1 m Buah 174,600 166,300 8,315 174,615
100 x 100 x 120 (12,5
12 Box Culvert 4,031,900
cm)
13 Box Culvert 80 x 80 x 120 (11 cm) 2,894,550
14 Box Culvert 60 x 60 x 120 1,221,000
Box Culvert 120 x 120 x 120 15 cm 5,900,650
U Ditch 60.60.120.6 cm ( gandar 5 ton ) 727,950
U Ditch 60.60.120.6 cm ( gandar 10 ton ) 772,800
U Ditch 60.60.120.10 cm ( gandar 20 ton ) 1,348,950
U Ditch 80.80.120.10 cm ( gandar 5 ton ) 1,388,050
U Ditch 80.80.120.6 cm ( gandar 10 ton ) 1,607,700
U Ditch 80.80.120.12 cm ( gandar 20 ton ) 2,045,850
U Ditch 100.100.120.10 cm ( gandar 5 ton ) 1,765,250
U Ditch 100.100.120.12 cm ( gandar 10 ton ) 2,387,400
U Ditch 100.100.120.15 cm ( gandar 20 ton ) 3,453,450
U Ditch 120.120.120.12 cm ( gandar 5 ton ) 2,628,900
U Ditch 120.120.120.12 cm ( gandar 10 ton ) 2,872,700
U Ditch 120.120.120.15 cm ( gandar 20 ton ) 4,056,050
CU 60.10.120 CM (72) ( gandar 5 ton ) 393,300
CU 60.12.120 CM (72) ( gandar 10 ton ) 461,150
CU 60.15.120 CM (80) ( gandar 20 ton ) 731,400
CU 80.10.120 CM (100) ( gandar 5 ton ) 516,350
CU 80.12.120 CM (100) ( gandar 10 ton ) 792,350
CU 80.15.120 CM (104) ( gandar 20 ton ) 1,030,400
CU 100.12.120 CM (120) ( gandar 5 ton ) 740,600
CU 100.12.120 CM (124) ( gandar 10 ton ) 857,900
CU 100.20.120 CM (130) ( gandar 20 ton ) 1,576,650
CU 120.12.120 CM (144) ( gandar 5 ton ) 980,950
CU 120.12.120 CM (144) ( gandar 5 ton ) 1,360,450
CU 120.20.120 CM (150) ( gandar 5 ton ) 1,930,850
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
25 Tiang pancang beton diamtr. 300 mm - -
Type A2, L : 6 m m 309,750 295,000 14,750 309,750
Type A2, L : 8 m m 211,950 201,900 10,095 211,995
Type A2, L : 12 m m 196,750 187,400 9,370 196,770
26 Tiang pancang beton diamtr. 300 mm - -
Type A3, L : 6 m m 247,800 236,000 11,800 247,800
Type A3, L : 8 m m 232,750 221,700 11,085 232,785
Type A3, L : 12 m m 217,550 207,200 10,360 217,560
27 Tiang pancang beton diamtr. 300 mm - -
Type BO, L : 6 m m 275,400 262,300 13,115 275,415
Type BO, L : 8 m m 260,250 247,900 12,395 260,295
Type BO, L : 12 m m 245,050 233,400 11,670 245,070
Tiang pancang beton PC A Ø 300 mm -
28 m 333,450 317,600 15,880 333,480
6 m K.500
29 Tiang Pancang beton 20 x 20 cm K.500 m 141,000 134,300 6,715 141,015
Biaya pemancangan tiang pancang Ø
30 m 83,450 79,500 3,975 83,475
300 mm (Drop Hammer)
Biaya pemancangan tiang pancang 20
31 m 19,300 18,400 920 19,320
x 20cm (Drop Hammer)
Biaya pemancangan tiang pancang 20
32 m 64,150 61,100 3,055 64,155
x 20cm (Injection)
mob Demob Alat Pancang Drop
33 Unit 57,720,700 54,972,100 2,748,605 57,720,705
Hammer (Ø 300 mm)
mob Demob Alat Pancang Drop
34 Unit 19,240,300 18,324,100 916,205 19,240,305
Hammer (20 x 20 cm)
mob Demob Alat Pancang Injection (20
35 Unit 44,893,900 42,756,100 2,137,805 44,893,905
x 20 cm)

RBCB Top + RBCB


36 Box Culvert Unit 26,087,450 24,845,200 1,242,260 26,087,460
Bottom, Pasang + Turun
37 Patok Beton Buah 42,000 35,000 7,000 42,000

BAHAN UNTUK PENGECATAN /


DD
BAHAN FINISHING
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
1 Bronze Kg 53,750 51,200 2,560 53,760
4 Cat tembok Vinilek, Aviapaint (sejenis) Kg 41,975 16,900 845 17,745 28,000
5 Cat tembok Interior (mowilex) Kg 42,000 40,000 2,000 42,000
6 Cat tembok Eksterior (Pentalux) Kg 69,900 66,600 3,330 69,930
Cat genteng ltr 65,600
8 Cerlak Kg 114,750 109,300 5,465 114,765
9 Dempul Kg 28,750 27,400 1,370 28,770
11 Glass block Buah 27,050 25,800 1,290 27,090
13 Karet Roll 77,450 73,800 3,690 77,490
19 menie A Kg 26,850 25,600 1,280 26,880
20 menie B Kg 14,700 14,000 700 14,700
26 Plamur besi Kg 78,850 75,100 3,755 78,855
27 Plamur kayu Kg 19,400 18,500 925 19,425
28 Plamur tembok Kg 8,600 7,100 355 7,455
31 Soda api Kg 26,750 25,500 1,275 26,775
32 Spiritus Liter 17,950 17,100 855 17,955
34 Splite pen Buah 25,500 24,300 1,215 25,515
35 Teer Liter 50,150 47,800 2,390 50,190
36 Teak oil Liter 15,850 15,100 755 15,855
38 Cat marka kg 33,150 31,600 1,580 33,180
39 Glass Beads (manik-manik kaca) kg 39,650 34,500 37,800 1,890 39,690
40 Cat Kayu (Finishing Transparan) kg 117,600 98,000 19,600 117,600

EE PEKERJAAN KONSTRUKSI IRIGASI


A. Bahan
1 Bambu Petung Batang 16,550 15,800 790 16,590
2 Gedek bambu 2 x 3 m Lembar 25,600 24,400 1,220 25,620
3 Ijuk Kg 19,800 18,900 945 19,845
4 Filter Oil Unit 141,000 134,300 6,715 141,015
5 Filter Solar Unit 87,150 83,000 4,150 87,150
6 Film Foto Fuji Roll 43,550 41,500 2,075 43,575
7 Album Foto Buah 28,200 26,900 1,345 28,245

B. Alat Bantu - -
1 Gergaji besi Buah 14,050 13,400 670 14,070
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
2 Kotak adukan Buah 32,000 30,500 1,525 32,025
3 Kasut kayu Buah 7,750 7,400 370 7,770
4 Cuci film Roll 20,550 19,600 980 20,580
Universal Curent meter F1,3 metal
5 Seba Unit 123,895,350 117,995,600 5,899,780 123,895,380
Propeler
6 Curent meter C.31, metal Propeler A.OTT Unit 116,607,500 111,054,800 5,552,740 116,607,540
7 Litering Set HOPE Set 5,830,300 5,552,700 277,635 5,830,335
8 Electronic Digital Theodolite DT 500 SOKKIA Unit 55,971,600 53,306,300 2,665,315 55,971,615
9 Electronic Digital Theodolite DT 2E SOKKIA Unit 106,345,950 101,281,900 5,064,095 106,345,995
10 Alumunium Levelling Staves (6x3,2 cm) TS 5-5 EB Unit 1,415,150 1,347,800 67,390 1,415,190
Square Pile 20x20 cm Prestress K-500
11 m' 163,150 155,400 7,770 163,170
4 EA diam. 7 mm PC Wire
12 Theodolite - Topcon DT 202 Unit 93,532,200 89,078,300 4,453,915 93,532,215
- Topcon DT 205 Unit 57,915,150 55,157,300 2,757,865 57,915,165
- Topcon DT 209 Unit 46,162,600 43,964,400 2,198,220 46,162,620
- Nikon NE 100 Unit 34,632,450 32,983,300 1,649,165 34,632,465
- Nikon NE 101 Unit 36,775,050 35,023,900 1,751,195 36,775,095
- Nikon NE 102 Unit 50,345,250 47,947,900 2,397,395 50,345,295
13 Waterpass - Topcon ATG 6 Unit 8,075,000 7,690,500 384,525 8,075,025
- Nikon AX - 2S Unit 6,879,900 6,552,300 327,615 6,879,915
- Nikon AC - 2S Unit 7,594,100 7,232,500 361,625 7,594,125
- Nikon AP - 8 Unit 10,450,950 9,953,300 497,665 10,450,965
- Flowatch FL - 03 JDC
14 Curentmeter Unit 13,371,950 12,735,200 636,760 13,371,960
made in Swiss
- Flowprobe Global
Unit 14,657,450 13,959,500 697,975 14,657,475
Water made in USA
- made in England Unit 25,915,950 24,681,900 1,234,095 25,915,995
15 Bak Ukur 5 meter Unit 1,317,600 1,254,900 62,745 1,317,645
16 Current meter Tatonas TH-02 Unit 38,866,350 37,015,600 1,850,780 38,866,380
- -
FF PEKERJAAN PINTU AIR ( PENGAIRAN ) - -
A. Bahan - -
1 Bahan konstruksi - -
- Bronze Kg 41,650 39,700 1,985 41,685
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
2 Bahan dikerjakan mesin - -
- Bos Bronze Kg 116,550 111,000 5,550 116,550
- Besi Cor Kg 8,700 8,300 415 8,715
- Baja Cor ( Roda gigi m.100 (337 Kg ) Ps 3,039,000 2,894,300 144,715 3,039,015
3 Bahan bahan lain - - -
- Nipple Buah 44,400 42,300 2,115 44,415
- Spie Buah 17,600 16,800 840 17,640
- Drucklager kecil/besar Buah 421,250 401,200 20,060 421,260
- Angker Bolt (20 kg) Buah 23,100 22,000 1,100 23,100
- Seal Buah 3,850 3,700 185 3,885
- Na F + ring Buah 190,950 181,900 9,095 190,995
- Seal karet m² 291,450 277,600 13,880 291,480
- Stang pemutar Buah 205,150 195,400 9,770 205,170
B. Ongkos Kerja - -
4 Ongkos kerja - -
- Ongkos kerja konst Kg 3,300 3,300
- Ongkos kerja mesin Kg 14,400 14,400
- Ongkos kerja kayu m³ 825,200 825,200
- Sandblasting dan cat m² 97,000 97,000
- Pengecatan tanpa sand m² 46,100 46,100
5 Pemasangan Kg 3,400 3,400
6 Pembongkaran Kg 2,200 2,200
7 TRANSPORT Kg 2,200 2,200

ONGKOS DAN BAHAN


GG
PENYEDIAAN AIR BERSIH
ONGKOS PENGEBORAN SAmPAI
A
KEDALAmAN 60 m
Pengeboran dan Psg Casing Ø 2" s/d
1 m' 183,300 183,300
Ø 3" (Tanah Biasa)
Pengeboran dan Psg Casing Ø 4" s/d
2 m' 244,300 244,300
Ø 6" (Tanah Biasa)
Pengeboran dan Psg Casing Ø 8" s/d
3 m' 305,400 305,400
Ø 10" (Tanah Biasa)
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Pengeboran dan Psg Casing Ø 2" s/d
4 m' 244,300 244,300
Ø 3" (Tanah keras)
Pengeboran dan Psg Casing Ø 4" s/d
5 m' 305,400 305,400
Ø 6" (Tanah keras)
Pengeboran dan Psg Casing Ø 8" s/d
6 m' 366,500 366,500
Ø 10" (Tanah keras)
BAHAN PEKERJAAN - -
HH PENGEBORAN dan PENYEDIAAN - -
1 AIR
AquaBERSIH
Del (40 kg) zak 244,800 PU. Pengairan 222,100 11,105 233,205
2 Bentonit (40 kg) zak 153,000 138,900 6,945 145,845
3 Lem Pipa kg 42,300 38,400 1,920 40,320
4 Wall pipe 0,5 x 2" m' 448,500 406,900 20,345 427,245
5 Wall pipe 0,5 x 3" m' 511,800 464,300 23,215 487,515
6 Wall pipe 0,5 x 42" m' 766,700 695,500 34,775 730,275
7 Wall pipe 0,5 x 6" m' 888,300 805,800 40,290 846,090
8 Wall pipe 0,5 x 8" m' 1,041,000 944,300 47,215 991,515
9 Generator Set 10 KVA (open) Unit 19,100,300 17,324,600 866,230 18,190,830
10 Generator Set 15 KVA (open) Unit 28,650,400 25,986,800 1,299,340 27,286,140
11 Generator Set 20 KVA (open) Unit 38,200,600 34,649,100 1,732,455 36,381,555
12 Generator Set 25 KVA (open) Unit 47,750,600 43,311,300 2,165,565 45,476,865
13 Generator Set 35 KVA (open) Unit 66,851,000 60,635,900 3,031,795 63,667,695
14 Generator Set 40 KVA (open) Unit 76,401,100 69,298,100 3,464,905 72,763,005
15 Profil Tank 1000L Unit 2,081,300 1,887,900 94,395 1,982,295
16 Profil Tank 2000L Unit 4,162,800 3,775,900 188,795 3,964,695
17 Profil Tank 4000L Unit 8,325,700 7,551,700 377,585 7,929,285
18 Profil Tank 5000L Unit 10,407,200 9,439,700 471,985 9,911,685
19 Tutup manhole 0,4 x 0,4 Unit 336,600 305,400 15,270 320,670
20 Tutup manhole 0,5 x 0,5 Unit 367,300 333,200 16,660 349,860
21 Tutup manhole 0,6 x 0,6 Unit 428,500 388,700 19,435 408,135
22 Tutup Box Valve 0,6 x 0,6 Unit 428,500 388,700 19,435 408,135
23 Tutup Box Valve 0,8 x 0,8 Unit 612,200 555,300 27,765 583,065
- -
PERALATAN BERAT (PEK. JALAN
II - -
DAN JEMBATAN)
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
1 Asphalt mixing Plant Unit 5,964,472,050 5,680,449,600 284,022,480 5,964,472,080
2 Asphalt Finisher 30 HP Unit 3,171,723,100 3,020,688,700 151,034,435 3,171,723,135
3 Asphalt Sprayer 350 l Unit 84,540,400 80,514,700 4,025,735 84,540,435
4 Bulldozer 110 HP Unit 1,200,497,200 1,143,330,700 57,166,535 1,200,497,235
5 Compressor 150 L\m Unit 74,628,750 71,075,000 3,553,750 74,628,750
6 Concrete mixer 0,5/0,45 m² (20 HP) Unit 139,023,750 132,403,600 6,620,180 139,023,780
7 Crane 10 -15 T Unit 474,592,400 451,992,800 22,599,640 474,592,440
8 Dump Truck 3 Ton Unit 215,723,750 205,451,200 10,272,560 215,723,760
9 Dump Truck 5 Ton Unit 269,363,200 256,536,400 12,826,820 269,363,220
10 Excavator Unit 658,832,150 627,459,200 31,372,960 658,832,160
Dump Truck 3,5 Ton (Flat Bed Truck 4
11 Unit 177,779,700 169,314,000 8,465,700 177,779,700
T) 115 HP
12 Generator Set Unit 146,932,650 139,935,900 6,996,795 146,932,695
13 motor Grader >100 HP Unit 1,838,404,250 1,750,861,200 87,543,060 1,838,404,260
14 Trac Loader 75-100 HP Unit 815,435,950 776,605,700 38,830,285 815,435,985
15 Wheel Loader 80 HP Unit 650,232,000 619,268,600 30,963,430 650,232,030
16 Three Wheel Roller 8/10 T Unit 301,686,800 287,320,800 14,366,040 301,686,840
17 Tandem Roller 8/10 T. Unit 520,787,400 495,988,000 24,799,400 520,787,400
18 Tire Roller 15 T. Unit 755,612,300 719,630,800 35,981,540 755,612,340
19 Vibratory Roller 5-8 T. Unit 320,670,500 305,400,500 15,270,025 320,670,525
20 Concrete Vibrator 4 HP Unit 11,825,100 11,262,000 563,100 11,825,100
21 Stone Crusher 200 HP Unit 1,650,905,850 1,572,291,300 78,614,565 1,650,905,865
22 Water Pump Unit 9,266,000 8,824,800 441,240 9,266,040
23 Water Tanker 115 HP Unit 183,166,900 174,444,700 8,722,235 183,166,935
24 Pedestrian Roller Unit 79,817,850 76,017,000 3,800,850 79,817,850
25 Plate Stamper 4 HP Unit 18,947,000 18,044,800 902,240 18,947,040
26 Jack Hammer Unit 57,137,600 54,416,800 2,720,840 57,137,640
27 Fulvi mixer Unit 1,049,467,200 999,492,600 49,974,630 1,049,467,230
28 Dump Truk Unit 367,500,000 350,000,000 17,500,000 367,500,000
29 Kontainer Armroll Unit 52,500,000 50,000,000 2,500,000 52,500,000
30 Sepeda Motor Gerobak Unit 34,996,500 33,330,000 1,666,500 34,996,500
31 Truck Crane Unit 840,000,000 800,000,000 40,000,000 840,000,000
32 Baby Roller Unit 105,000,000 100,000,000 5,000,000 105,000,000
33 Skate Mate Digital Unit 210,000 200,000 10,000 210,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
34 Wheel Meter Unit 1,050,000 1,000,000 50,000 1,050,000
35 Fleld CBR Test Unit 26,250,000 25,000,000 1,250,000 26,250,000
36 Sand Cone Test Unit 5,775,000 5,500,000 275,000 5,775,000
37 Genset Portabel (AC-DC)/Lampu TL Unit 6,825,000 6,500,000 325,000 6,825,000
38 Temperature Gauge Unit 1,312,500 1,250,000 62,500 1,312,500
39 Hammer Test Unit 13,125,000 12,500,000 625,000 13,125,000
40 Mesin Vertikal untuk cone drill Unit 10,500,000 10,000,000 500,000 10,500,000
41 Centrifugal Extractor Unit 13,650,000 13,000,000 650,000 13,650,000
42 Winch/Chain Block Unit 7,350,000 7,000,000 350,000 7,350,000
43 Digital teodolit total station Type SPD KS 6M3 Unit 38,850,000 37,000,000 1,850,000 38,850,000
Tertutup, dimensi 330
cm x 180 cm x 120 cm,
rangka Sasis Besi UNP
100, Rangka Badan Besi
UNP 100-50, Rangka
44 Kontainer Sampah Pintu Besi UNP 50, buah 31,110,000
Dinding Plat eser 2 mm,
Lantai Plat Eser 2.5 mm,
Lapisan Fiber Glass 2
mm, Besi kaitan baja
masip 32 mm, diameter
roda besi pipa 6 inc - -
JJ ALAT LABORATORIUM - -
1 Core Drilling Test Set Set 34,960,900 33,296,100 1,664,805 34,960,905
2 Field CBR Test Set Set 15,849,000 15,094,300 754,715 15,849,015
3 Dutch Cone Penetrometer Set 43,453,200 41,384,000 2,069,200 43,453,200
4 Hand Bor Set 7,647,150 7,283,000 364,150 7,647,150
5 Standart Penetratian Test Set 22,440,450 21,371,900 1,068,595 22,440,495
6 Digital Balance (Timbangan digital) Set 28,663,600 27,298,700 1,364,935 28,663,635
7 Digital Caliper 300 mm/12" Buah 2,157,200 2,054,500 102,725 2,157,225
8 Vernier Caliper 150 mm Buah 192,450 183,300 9,165 192,465
9 Vernier Caliper 300 mm Buah 844,300 804,100 40,205 844,305
10 Hydraulic Cylinder Buah 6,355,100 6,052,500 302,625 6,355,125
11 Hydraulic Hand Pump Buah 10,057,300 9,578,400 478,920 10,057,320
Hydaulic Dutch Cone Penetrometer (5
12 Set 122,437,750 116,607,400 5,830,370 122,437,770
ton cap.)
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
13 GPS Waterprof Set 14,226,100 13,548,700 677,435 14,226,135
- -
KK LAIN LAIN - -
1 Atap ilalang buah 15,000
2 Papan nama proyek Unit 408,100 388,700 19,435 408,135
3 Roster Buah 8,625 5,400 270 5,670
4 Batu paras m² 83,850 79,900 3,995 83,895
5 Batu tempel hitam I. Uk. Warna Brand m² 100,550 95,800 4,790 100,590
6 Sewa alat / pekerjaan las Colour : 1.Strip atas jam 40,300 38,400 1,920 40,320
warna hijau 20
cm,2.Strip Warna
Orange 10 cm,3. Strip
Warna Kuning 20 cm,4.
Strip bawah warna hijau
20 cm. II. Uk. Papan
Brand Colour : Panjang
Brand Colour Min. 8 M,lebar/tinggi Unit 15,000,000 Dinas Koperasi
papan 70 cm,lebar
lipatan ACP pada
kerangka 2 cm, III. Ciri
Khusus Brand : pada
Bagian pojok kiri bawah
terdapat ditempel
dengan AKRINDO JAWA
7 Pengelasan TIMUR dan NO. cm 2,400 2,300 115 2,415
8 milamin REGISTER liter - 45,000 2,250 47,250
9 Engsel pintu Aluminium stenlees Unit - 42,800 2,140 44,940
10 Engsel pintu Aluminium biasa Unit - 38,400 1,920 40,320
11 Engsel jendela Aluminium stenlees Unit - 36,700 1,835 38,535
12 Grendel jendela Aluminium mutu baik Buah - 33,600 1,680 35,280
13 Grendel jendela Aluminium biasa Buah - 30,500 1,525 32,025
14 Grendel pintu Unit - 61,300 3,065 64,365
15 Kunci pintu Aluminium Buah 209,150 199,200 9,960 209,160
16 Sealand tube - 33,600 1,680 35,280
17 Karet Roll 48,150 45,900 2,295 48,195
18 Karet Pentil Karet gelang, 1 Pak = 500 grm Pak 28,250
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Pasang pintu kaca tbl 10 - 12 mm dgn
19 m² 1,528,650 1,455,900 72,795 1,528,695
engsel tanam
Gypsum board 9 mm merk Elephant
20 (elephant,jayaboard,knauf) Lembar 72,000 3,600 75,600
uk. 1,20 x 2,40 m
Gypsum board 9 mm merk Indal uk.
21 Lembar 70,850 67,500 3,375 70,875
1,20 x 2,40 m
22 List gypsum m' 24,250 23,100 1,155 24,255
23 Pembangunan Pagar BRC (tinggi 1,2m) mtr 649,400 618,500 30,925 649,425
24 Pintu pagar besi Onda mtr 643,750 613,100 30,655 643,755
25 Pagar besi mtr 1,106,250 1,053,600 52,680 1,106,280
26 Pembuatan sumur bor mtr 147,200 140,200 7,010 147,210
27 Pintu kaca tremped 12 mm Unit 4,693,350 4,469,900 223,495 4,693,395
Daun jendela alumunium isi kaca
28 Buah 502,950 479,000 23,950 502,950
rayben uk 130x60 cm
Daun jendela alumunium isi kaca
29 Buah 301,650 287,300 14,365 301,665
rayben uk 60x45 cm
30 Railling tangga pipa ulir dan nako m² 705,350 671,800 33,590 705,390
31 Hand railling tangga staelees m² 897,850 855,100 42,755 897,855
32 Plafon gypsum rangka metal furing m² 114,450 109,000 5,450 114,450
33 Pintu PVC lengkap Buah 320,650 305,400 15,270 320,670
34 Kran air leher angsa Buah 101,850 97,000 4,850 101,850
35 Tempat sabun besar Buah 43,550 41,500 2,075 43,575
36 Clean out stenllis Buah 42,800 40,800 2,040 42,840
37 Avour lantai stenllis Buah 42,800 40,800 2,040 42,840
38 Penangkal Petir 90 mtr (lengkap) Unit 3,356,400 3,196,600 159,830 3,356,430
39 Galian strous diam 30 m m' 47,000 44,800 2,240 47,040
40 Galian strous diam 40 m m' 53,550 51,000 2,550 53,550
42 Precast motif Unit 201,150 191,600 9,580 201,180
43 mesin Pompa ( Jet Pump ) 300 W Unit 1,408,150 1,341,100 67,055 1,408,155
44 Pipa Porous m 44,300 42,200 2,110 44,310
45 Plastik Filter m² 15,200 14,500 725 15,225
46 Plastik cup sealer Uk. 120 x 200 cm, bahan Roll 109,500
47 Pintu alumunium floorthing kaca 5 mm, alumunium Unit 4,100,000 LH
48 Pintu alumunium sliding brown
Bahan kaca 5 mm, Alumunium brownUnit 1,750,000 LH
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Uk. 82 x 200 cm,
alumunium bahan tiang
moher + kaca polos 5
49 Pintu alumunium Unit 1,750,000 LH
mm + engsel kupu,
pegangan stainless +
door closer 90 ° stop
Uk. 36 x 72 cm, kaca
Penutup lubang angina (Jendela atas
50 polos 5 mm + lis Unit 60,000 LH
pintu)
alumunium
52 Gebalan Rumput m² 17,500 16,700 835 17,535
53 Plat Rambu (Eng. Grade) Buah 205,150 195,400 9,770 205,170
54 Plat Rambu (High I. Grade) Buah 329,700 314,000 15,700 329,700
55 Rel Pengaman (Guardrill Plat) m 481,100 458,200 22,910 481,110
56 Wallpaper 1 roll ( 10 m x 0,50 m ) m' 20,450 19,500 975 20,475
Wallpaper tekstur premium m2 -
57 Upah Jasa Pompa Air hari 1,166,000 1,110,500 55,525 1,166,025
58 Upah Jasa mesin Foto Copy Buah 1,166,000 1,110,500 55,525 1,166,025
59 Upah Jasa mesin Potong Rumput hari 583,050 555,300 27,765 583,065
60 Jepit Gypsum Kecil m 16,350 15,600 780 16,380
61 Jepit Gypsum Sedang m 21,000 20,000 1,000 21,000
62 Jepit Gypsum Besar m 25,600 24,400 1,220 25,620
63 Kanopi m² 105,000 100,000 5,000 105,000
64 Kanopi dan kerangka Unit 524,650 499,700 24,985 524,685
67 Shower Kamar mandi Buah 291,450 277,600 13,880 291,480
70 Kunci Pintu Solid Buah 262,350 249,900 12,495 262,395
71 Kaca penutup jendela Kaca mati + lis alumunium Unit 60,000
72 Engsel Pintu Solid Stel 87,450 83,300 4,165 87,465
73 Grendel Tanam Solid Buah 145,800 138,900 6,945 145,845
74 Door Closer Solid Buah 204,000 194,300 9,715 204,015
Pas. Lampu Downlight 20 Watt
75 Buah 215,750 205,500 10,275 215,775
Reflector Strip
77 Font mirror untuk papan nama kantor / m² 2,915,200 2,776,400 138,820 2,915,220
78 Hak Angin Solid Buah 87,450 83,300 4,165 87,465
79 Saklar Tunggal Tens Buah 40,800 38,900 1,945 40,845
80 Saklar Ganda Tens Buah 52,350 49,900 2,495 52,395
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
82 Shower Hot and Cool Solid Buah 874,500 832,900 41,645 874,545
83 Shower Tray Buah 874,500 832,900 41,645 874,545
84 Sterofoam Type sekat 3 Bal 43,000
85 Water Heather Gas Buah 495,600 472,000 23,600 495,600
87 Pagar Besi minimalis Pipa besi persegi 1.4mm m² 577,150 549,700 27,485 577,185
88 Pintu Dorong/Geser minimalis Pipa besi persegi 1.4mm, Plat Eser m² 693,800 660,800 33,040 693,840
Rangka besi pipa
89 Kanopi/Awning galvanis/pipa persegi, m² 495,600 472,000 23,600 495,600
Atap Twinlite
90 Patok Beton K. 125, Besi Beton 10 mm Buah 489,700 466,400 23,320 489,720
91 Batu Gilang m² 105,600 100,600 5,030 105,630
92 Batu Kerikil halusФ 0.2 s/d 0.5 cm Sak 37,350 35,600 1,780 37,380
93 Batu Kerikil halusФ 1 s/d 2 cm Sak 37,350 35,600 1,780 37,380
95 Dolken kayu galam uk. 10/4 m btg 11,550 11,000 550 11,550
96 Kayu Sengon m² 1,399,200 1,332,600 66,630 1,399,230
97 papan sengon m² 1,865,700 1,776,900 88,845 1,865,745
98 Profil Aluminium m² 104,450 99,500 4,975 104,475
99 Profil Kaca m² 8,050 7,700 385 8,085
100 Paku Sekrup 10 cm Biji 200 200 10 210
101 Rangka Atap galvalum m² 186,550 177,700 8,885 186,585
102 Besi Hollow 4x4 cm 6m Batang 113,700 108,300 5,415 113,715
103 Elektroda baja Kg 33,900 32,300 1,615 33,915
104 Paving Stoen motif K300 m² 66,450 63,300 3,165 66,465
105 Grass Black motif K300 m² 60,150 57,300 2,865 60,165
106 Atap Tegola tebal 3 mm Buah 214,600 204,400 10,220 214,620
107 Bubungan Tegola Buah 31,350 29,900 1,495 31,395
108 Polycarbonat m² 48,900 46,600 2,330 48,930
109 Air Liter 15 - -
110 minyak bekisting Liter 18,650 17,800 890 18,690
111 Formite Buah 8,700 8,300 415 8,715
113 Kaca Cermin tb. 5 mm m² 105,000 100,000 5,000 105,000
114 Kaca Cermin Tebal 5 mm befel m 346,500 330,000 16,500 346,500
115 Sewa Alat welding Jam 10,250 9,800 490 10,290
116 Text font 40 cm neon fiber Buah 145,800 138,900 6,945 145,845
117 Text font 10 cm neon stainless Buah 87,450 83,300 4,165 87,465
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
118 Kabel NYF GBY 4x4 m² 62,550 59,600 2,980 62,580
119 Kabel NYY 3 x 2,5 mm m² 14,050 13,400 670 14,070
120 Kabel NYYHY 4 x 2,5 mm m² 20,450 19,500 975 20,475
Lampu TL 2x18 W/220 V komplit
121 Set 180,700 172,100 8,605 180,705
balas,kaca
122 Isolator Buah 1,650 1,600 80 1,680
123 Pipa 5/8" Batang 21,600 20,600 1,030 21,630
124 T Doos PVC Buah 4,900 4,700 235 4,935
125 Las Doof Pcs 700 700 35 735
126 LP + Fuse panel Pcs 22,750 21,700 1,085 22,785
127 Volt + Vss Pcs 423,250 403,100 20,155 423,255
128 Ampere meter + ct Pcs 423,250 403,100 20,155 423,255
129 Box Panel Pcs 1,418,300 1,350,800 67,540 1,418,340
130 Grounding BC 6 mm Unit 315,800 300,800 15,040 315,840
131 Upah Wiring panel Ls 408,100 388,700 19,435 408,135
132 Upah pasang panel Ls 466,400 444,200 22,210 466,410
133 Upah Penataan Arsip Meter Linier 450,000
134 Landscape Titik 87,450 83,300 4,165 87,465
135 Tangki air Stainles Steel 1000 lt Unit 2,565,350 2,443,200 122,160 2,565,360
Blue Marlin, bahan fiber,
Volume 3000 ltr Uk. D.
136 Tangki air Buah 5,323,500 5,070,000 253,500 5,323,500
163 Tebal 163, tinggi
198
137 Tenda Plafon Biasa Ukuran : Unit 3,206,700 3,054,000 152,700 3,206,700
P. 5m X L.3m X T.depan
- -
3m X T. Belakang 2,75 m
Atap : Terpal - -
130 Tenda Kerucut Ukuran : Unit 3,206,700 3,054,000 152,700 3,206,700
P. 3m X L.3m X T.Tiang - -
Atap : Terpaulin - -
131 Gerobak Dorong /Rombong Ukuran : Unit 2,623,600 2,498,700 124,935 2,623,635
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO

P.150 cm X L.60 cm X
T.180 cm. ( termasuk - -
roda )
Atap : Seng - -
Kerangka : kayu mahoni - -
Dinding : multiplek - -
Kaca : Bening 3mm - -
Roda 2 sejenis roda
sepeda motor dengan - -
ban baru
132 Gerobak PKL KaSet Ukuran : Unit 2,623,600 2,498,700 124,935 2,623,635
P.150 cm X L.60 cm X
- -
T.150 cm.
Kerangka : kayu tahunan 4 cm X 6 Cm - -
Dinding : Triplek di cat - -
Roda 2 sejenis roda
sepeda motor dengan - -
ban baru
133 Raise Florr M² 964,650 918,750 45,938 964,688
134 Biaya Intalasi Raise Floor M² 179,150 170,625 8,531 179,156
Franco Banyuwangi & Packaging
135 Ls 3,445,300 3,281,250 164,063 3,445,313
Material
136 Akomodasi Teknisi Ls 2,048,250 1,950,750 97,538 2,048,288
137 Double Cup Filter Ls 735,000 700,000 35,000 735,000
138 Lem Besi Buah 6,700 6,400 320 6,720
146 Avo meter 1000 K Buah 73,800 70,300 3,515 73,815
147 Seng Talang meter 30,200 28,800 1,440 30,240
148 Seng Gelombang Pj = 2,40 m Lembar 68,425 72,100 3,605 75,705
150 Tenol Solder 1,2 mm Roll 40,300 38,400 1,920 40,320
151 Contack Cliner ( American ) Kaleng 41,550 39,600 1,980 41,580
152 Sifon Wastafel Buah 58,938 17,900 895 18,795
153 Kran Wastafel Buah 56,250 53,600 2,680 56,280
154 Kran Kuningan Buah 26,750 25,500 1,275 26,775
155 Pacul Baja Buaya ( Besar ) Buah 110,688 63,900 3,195 67,095
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
156 Kunci Pintu Bruno ( Besar ) Buah 88,500 84,300 4,215 88,515
157 Gembok Goldoor 40 mm Buah 77,050 73,400 3,670 77,070
158 Gembok Goldoor 50 mm Buah 97,200 92,600 4,630 97,230
159 Triplek Alumunium Pintu 5 mm Lembar 107,300 102,200 5,110 107,310
160 Triplek micca Lembar 73,800 70,300 3,515 73,815
161 Palu Pengungkit Buah 26,750 25,500 1,275 26,775
162 Pisau Potong Rumput Buah 80,500 76,700 3,835 80,535
163 mesin Ketam Buah 362,250 287,300 14,365 301,665
164 Aqua Proof Kaleng 49,450 54,300 2,715 57,015
165 Gunting Seng Buah 80,500 14,000 700 14,700
166 Lem Elteco Buah 6,900 5,200 260 5,460
167 mata Gergaji Baja Buah 1,609,200 1,532,600 76,630 1,609,230
168 Bambu Besar Batang 40,300 38,400 1,920 40,320
169 Bambu Umbul Umbul Batang 20,050 19,100 955 20,055
Dimensi 100 mmX 100
170 Standar Ramp Steel Unit 2,625,000 2,500,000 125,000 2,625,000
mm
171 Facia + Intalasi Double Cup Filter M² 380,600 362,500 18,125 380,625
172 Insulation Termal PE Mariba M² 360,900 343,750 17,188 360,938
173 Digital Door Lock Samsung Unit 5,250,000 5,000,000 250,000 5,250,000
174 Floor Hinge Dekkson Dekkson Unit 997,500 950,000 47,500 997,500
175 Peralatan Palang Pintu Elektronik - -
-Barier gate buah 23,625,000 22,500,000 1,125,000 23,625,000
-Remote buah 262,500 250,000 12,500 262,500
-Recever buah 525,000 500,000 25,000 525,000
-Braket dan Housing Outdoor buah 393,750 375,000 18,750 393,750
-DVR Stand Alone 4 chanel buah 3,281,250 3,125,000 156,250 3,281,250
-TV LED 19" Thosiba buah 1,706,250 1,625,000 81,250 1,706,250
-Biaya Pemasangan Ls 3,675,000 3,500,000 175,000 3,675,000
PEKERJAAN PEMBUATAN PAPAN NAMA NEON BOX
DAN HURUF NYALA :
176 Gudang arsip, 0.20 m x 1,75 m 1,750 m' 1,302,000 1,085,000 217,000 1,302,000
177 Ruang pelayanan, 0.20 m x 1,75 m 1,750 m' 1,302,000 1,085,000 217,000 1,302,000
178 Bid. Penanaman Modal, 0.20 m x 1,32 1,320 m' 1,302,000 1,085,000 217,000 1,302,000
179 Bidang perizinan, 0.20 m x 1,67 m 1,670 m' 1,302,000 1,085,000 217,000 1,302,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
180 Ruang proses, 0.20 m x 0.9 m 0,900 m' 1,302,000 1,085,000 217,000 1,302,000
181 Front Office 0.20 m x 0.9 m 0,900 m' 1,302,000 1,085,000 217,000 1,302,000
182 Help desk, 0.20 mx 1,75 m 1,750 m' 1,302,000 1,085,000 217,000 1,302,000
183 Sekretariat, 0.20 m x 1,45 m 1,450 m' 1,302,000 1,085,000 217,000 1,302,000
184 Kepala badan, 0.20 m x 1,00m 1,000 m' 1,302,000 1,085,000 217,000 1,302,000
Ruang presentasi dan investasi, 0.20
185 1,000 m' 1,302,000 1,085,000 217,000 1,302,000
m x 1,00m
186 Musholla, 0.20 m x 0.40 m 0,400 m' 1,302,000 1,085,000 217,000 1,302,000
187 Kantin 0.20 m x 0.40 m 0,400 m' 1,302,000 1,085,000 217,000 1,302,000
188 Toilet 0.20 m x 0.40 m 0,400 m' 1,302,000 1,085,000 217,000 1,302,000
189 Huruf nyala 'CAFÉ - INVESTASI' 16,000 buah 160,200 133,500 26,700 160,200
190 Penyambungan listrik dan kelengkapan 15,000 titik 198,000 165,000 33,000 198,000
Pengadaan Sarana dan Prasarana
191
Pelayanan Publik
192 Pintu Teralis pipa holo 2 x 3, 3 x 3, 4 x 4, engsel cat buah 630,000 525,000 105,000 630,000
193 Upah Instalasi Panel KWH a. Backdrop Wallpaper buah 179,850 149,900 29,980 179,880
A. INTERIOR RESEPSIONIS Depan,
Bahan:
b. BackdropBahan: Rangka
Bodi wallpaper
meja&top set 34,353,000 28,627,500 5,725,500 34,353,000
1. PEKERJA BACKDROP RESEPTIONtable danbelakang,
penutup
plywood
c. Credenza plywod
6,9,12
Bahan: 15
dan
&15mm
Rangka12 mm
(40x90x240),hollolaminated
laminated
galfalum
Bahan:
wallpaper
HPL,Bawah
Rabgka motif
2/4 penutup
dan meja bunga,
penutupada
lampu
laci dan led strip,
almari
gypsumboart
plywood 15,12,9 dan tepi
kecil,
9mm
II. PEKERJA MEJA COUNTER/RESEPION keliling
Tampak
laminated
6mm, backdrop.
depan
laminated
(70X110X640) resption,
wallpaper
HPL,
kanan
Bag atasdan
poloskiri mainan
credenza laci,
sirip
bagsirip plywod
bawah lapis
pintu
III. PEKERJA MAINAN FLAFON GANTUNG HPL, RUANG
Bahan: Rangka
Tampak RESPTION
dan
depan
penutup
reseption, Flafon
bag gantung
tengah
plywood
nat stainless15 dan "U",12 mm
Daun
laminated
pintu HPL,
koboy kerung
Penggantung flafon pipa
reseptionis, Finishing
steinlesslapis1/5",HPLInstalasi
titik lampu dan lampu
halogen LED 5 buah,
B. PEKERJAAN INTERIOR PENDAFTARAN PASIEN Finishing : Lapis HPL Set 46,442,000 46,442,000 9,288,400 55,730,400
I. PEKERJAAN BACKDROP
a. Backdrop Maingate, Pintu tembus keruang MR & Wallpaper
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Bahan: rangka dan
penutup plywood 15,
12,9 mm Laminated HPL
dan Wallpaper motip
bunga, Lampuled strip,
tei keliling backdrop
c. Bahan
Credenza (40x90x320)
: Rangka dan
penutup plywood 15, 12,
9 mm Laminated HPL,
Bagian atas credenza
Bahan:
laci, bagBody meja
bawah dan
pintu
II. PEKERJAAN MEJA CONTER PENDAFTARAN (70X110
top tabel plywood 6,1000)
9,
12 dan 15 mm laminated
HPL, Bawah meja ada
laci kecil dan almari
kecil, Tampak depan
resption, kanan dan kiri
mainan sirip sirip
plywood lapis HPL,
Tampak depan
reseption, bag tengah
nat steinless "U", Daun
pintu koboy ke ruang
C. PEKERJAAN INTERIOR COUNTER MEJAreseption, Finishing
Bahan:APOTIK
Body meja dan Set 20,790,000 17,325,000 3,465,000 20,790,000
I. PEKERJAAN COUNTER MEJA APOTIK Lapis HPL
(65x110x685)
top tabel plywood 6, 9,
12 dan 15 mm laminated
HPL, Bawah meja ada
laci kecil dan almari
kecil, Tampak depan
resption, kanan dan kiri
mainan sirip" plywood
lapis HPL, Tampak
depan reseption, bag
tengah nat steinless "U",
Daun pintu koboy ke
194 Stainless Steel ruang reseption, roll 322,050
195 Pengelasan Finishing Lapis HPL cm 2,750
196 Gazebo uk. 2,5 x 3 unit 30,000,000
kayu besar uk. 20x20
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
genteng pres 268,400 53,680 322,080
usuk 5/7 2,300 460 2,760
reng 3/5 25,000,000 5,000,000 30,000,000
lantai kayu
Bahan : Besi UK. Besi
197 Pagar Pembatas luar 4x4 cm , Besi Dalam buah 858,000
4 x 2 cm

Tinggi 120 cm, ketebalan


1 mm, lebar 1,5 mtr jarak
antara 15 cm

Kapasitas 500 Kg,


Kecepatan Angka 6
meter / menit , Rail
198 Avo meter Konstan buah 3,432,000
Sangkar 2 batang UNP
80 , Luas lantai lift D 150
cm

W120cm ,H 200 cm ,
Wire Rope ( Tali Baja )
6x37 IWRC,O 12mm,
Power Supplay 380 VAC
,4 amp ,3 phasa , 2.6
KVA , motor pengerak 2
HP ,1.5 KW merk Teco ,
Control otometis dengan
relay tombol dan limit
sensor

Bahan Multipleks
finishing high pressure
200 Backdrop Interior Ruang Resepsionis laminate (HPL), hiasan Set 40,000,000
lighting dan bahan
akrilik, luasan 25 m2.
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO

Bahan Multipleks
Finishing High Pressure
201 Backdrop Interior Ruang Rapat Laminate (HPL) dan set 15,000,000
Hiasan Lighting, Luasan
10 m2.

202 Akrilik Meter 700,000


- Menggali tanah biasa
203 Papan Operasi Irigasi sedalam 1 meter 0,500 unit 3,550,000
M3 Rp. 39.250
- Mengurung kembali
galian tanah biasa
sedalam 1 meter 0,310
M3 Rp. 13.080
- Memadatkan tanah
(per20 cm) 0,310 M3 Rp.
28.500
- Memasang 1 m' pipa
galvanis dia 3" 6,000 M
Rp. 204.990
- Memasang batu bela,
campuran 1 PC :4 PP
1,200 M3 Rp. 609.650

- Plesteran campuran 1
PC : 3 PP, tebal 15 mm
1,140 M2 Rp. 42.680

- Perakitan dan
penyetelan 1,000 unit
Rp. 25.250
- Pemotongan dan
pengeboran 1,000 Unit
Rp. 5.560
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO

- Multiplek Ukuran
2x120x240 cm 0,333 lbr
Rp. 278.500
- Besi siku L 30.30.3
21,080 Kg Rp. 12.700
- Overpal 1,000 Bh Rp. 11.000
- Gembok 1,000 Bh Rp. 97.200
- Angker besi beton
polos 1,234 Kg Rp.
13.750
- Hak jendela stenles
2,000 Bh Rp. 22.000
- Kawat nyamuk/ Kawat
kasa almunium 1,300
M2 Rp. 27.050
- Engsel jendela
almunium stenles 2,000
Bh Rp. 67.050

- Seng talang untuk atap


1,200 M Rp. 30.200

- Pengecatan bidang
kayu baru ( 1 lapis
plamir), 1 lapis cat dasar,
2 lapis cat 6,150 M2 Rp.
33.620
- Sablon per papan
1,000 Ls Rp. 50.000
- Transport ke lokasi per
papan 1,00 Ls Rp.
50.000
- Menggali tanah biasa
204 Papan RTTG sedalam 1 meter 0,500 Unit 3,550,000
M3 Rp. 39.250
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
- Mengurung kembali
galian tanah biasa
sedalam 1 meter 0,310
M3 Rp. 13.080
- Memadatkan tanah
(per20 cm) 0,310 M3 Rp.
28.500
- Memasang 1 m' pipa
galvanis dia 3" 6,000 M
Rp. 204.990
- Memasang batu bela,
campuran 1 PC :4 PP
1,200 M3 Rp. 609.650
- Plesteran campuran 1
PC : 3 PP, tebal 15 mm
1,140 M2 Rp. 42.680
- Perakitan dan
penyetelan 1,000 unit
Rp. 25.250
- Pemotongan dan
pengeboran 1,000 Unit
Rp. 5.560
- Multiplek Ukuran
2x120x240 cm 0,333 lbr
Rp. 278.500
- Besi siku L 30.30.3
21,080 Kg Rp. 12.700

- Overpal 1,000 Bh Rp.


11.000

- Gembok 1,000 Bh Rp.


97.200
- Angker besi beton
polos 1,234 Kg Rp.
13.750
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO

- Hak jendela stenles


2,000 Bh Rp. 22.000
- Kawat nyamuk/ Kawat
kasa almunium 1,300
M2 Rp. 27.050
- Engsel jendela
almunium stenles 2,000
Bh Rp. 67.050
- Seng talang untuk atap
1,200 M Rp. 30.200
- Pengecatan bidang
kayu baru ( 1 lapis
plamir), 1 lapis cat dasar,
2 lapis cat 6,150 M2 Rp.
33.620
- Sablon per papan
1,000 Ls Rp. 50.000
- Transport ke lokasi per
papan 1,00 Ls Rp.
50.000
- Menggali tanah biasa
205 Papan Larangan sedalam 1 meter 0,250 Unit 1,150,000
M3 Rp. 39.250
Ongkos Kerja Bongkar Pasang Sound
206 paket 10,000,000
System Equipment
Ongkos Kerja Bongkar Pasang
207 paket 9,000,000
Lighting Equipment
208 Decoration paket 7,600,000
209 Multimedia paket 12,500,000
Ongkos kerja bongkar pasang tenda
210 paket 4,350,000
samavile, balon udara, dll
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Bahan Besi : Besi Luar 4
x 4 cm, besi dalam 4 x 2,
211 Pagar Pembatas tinggi 120 cm, lebar 150 buah 1,100,000
cm, Ketebalan 1 mm dan
jarak antar besi 15 cm
215 Solartuff m2 300,000

LL Pompa Air 715,000 143,000 858,000


1 Power Kwh 0,55 Gronfos type 2 6,570,750 - -
2 Power Kwh 1,1 Gronfos type 2 7,911,850 2,860,000 572,000 3,432,000
3 Power Kwh 1,5 Gronfos type 6 9,118,600 - -
4 Power Kwh 3 Gronfos type 6 10,714,500
5 Power Kwh 2,2 Gronfos type 8 9,520,950 6,257,900 312,895 6,570,795
6 Power Kwh 3 Gronfos type 8 13,275,750 7,535,100 376,755 7,911,855
Grundfos SP 5A-12, 3 x
Power Kwh 1,1; H=48; Q= 5 m3/hr Unit 18,055,000 PU. Bina Marga
400 VSP
Grundfos 505A-17,
Hz 3 x
Power Kwh 1,5; H=67; Q= 5 m3/hr Unit 20,282,000 -sda-
400 VSP
Grundfos 505A-21,
Hz 3 x
Power Kwh 2,2; H=85; Q= 5 m3/hr Unit 23,066,000 -sda-
400 VSP
Grundfos 505A-25,
Hz 3 x
Power Kwh 2,2; H=100; Q= 5 m3/hr Unit 23,994,000 -sda-
400 VSP
Grundfos 508A-12,
Hz 3 x
Power Kwh 2,2; H=62; Q= 8 m3/hr Unit 28,500,000 -sda-
400 VSP
Grundfos 508A-15,
Hz 3 x
Power Kwh 2,2; H=63; Q= 8 m3/hr Unit 31,385,000 -sda-
400 VSP
Grundfos 508A-18,
Hz 3 x
Power Kwh 3,0; H=75; Q= 8 m3/hr Unit 40,598,000 -sda-
400 VSP
Grundfos 508A-21,
Hz 3 x
Power Kwh 4,0; H=90; Q= 8 m3/hr Unit 45,542,000 -sda-
400 VSP
Grundfos 508A-25,
Hz 3 x
Power Kwh 4,0; H=104; Q= 8 m3/hr Unit 49,339,000 -sda-
400 VSP
Grundfos 508A-25,
Hz 3 x
Power Kwh 5,5; H=122; Q= 8 m3/hr Unit 63,598,000 -sda-
400 SP
Grundfos V 50 Hz
14A-13, 3x
Power Kwh 4,0; H=60; Q= 14 m3/hr Unit 46,808,000 -sda-
400 V 50 Hz
Grundfos SP 14A-18, 3 x
Power Kwh 5,5; H=83; Q= 14 m3/hr Unit 58,130,000 -sda-
400 SP
Grundfos V 50 Hz
14A-25, 3x
Power Kwh 7,5; H=115; Q= 14 m3/hr Unit 78,936,000 -sda-
400 V 50 Hz
Grundfos SP 17-8, 3 x
Power Kwh 5,5; H=65; Q= 17 m3/hr Unit 79,527,000 -sda-
400 VSP
Grundfos 5017-9,
Hz 3 x
Power Kwh 5,5; H=72; Q= 17 m3/hr Unit 82,159,000 -sda-
400 V
Grundfos SP5017-10,
Hz 3 x
Power Kwh 5,5; H=79; Q= 17 m3/hr Unit 84,774,000 PU. Bina Marga
400 V
Grundfos 5017-11,
SP Hz 3 x
Power Kwh 7,5; H=89; Q= 17 m3/hr Unit 88,132,000 -sda-
400 V 50 Hz
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
Grundfos SP 17-12, 3 x
Power Kwh 7,5; H=96; Q= 17 m3/hr Unit 90,630,000 -sda-
400 V
Grundfos SP5017-13,
Hz 3 x
Power Kwh 7,5; H=103; Q= 17 m3/hr Unit 93,009,000 -sda-
400 V
Grundfos SP5017-14,
Hz 3 x
Power Kwh 9,2 H=113; Q= 17 m3/hr Unit 100,855,000 -sda-
400 V
Grundfos SP5017-15,
Hz 3 x
Power Kwh 9,2; H=120; Q= 17 m3/hr Unit 103,825,000 -sda-
400 VSP
Grundfos 5030-9,
Hz 3 x
Power Kwh 7,5; H=55; Q= 30 m3/hr Unit 95,051,000 -sda-
400 V 50 Hz 3 x
Grundfos SP 30-9,
Power Kwh 9,2; H=63; Q= 30 m3/hr Unit 85,095,000 -sda-
400 V
Grundfos SP5030-10,
Hz 3 x
Power Kwh 9,2; H=70; Q= 30 m3/hr Unit 87,997,000 -sda-
400 V
Grundfos SP5030-11,
Hz 3 x
Power Kwh 9,2; H=75; Q= 30 m3/hr Unit 90,883,000 -sda-
400 V
Grundfos SP5030-12,
Hz 3 x
Power Kwh 11; H=83; Q= 30 m3/hr Unit 95,034,000 -sda-
400 V
Grundfos SP5030-13,
Hz 3 x
Power Kwh 11; H=89; Q= 30 m3/hr Unit 99,759,000 -sda-
400 V
Grundfos SP5030-14,
Hz 3 x
Power Kwh 13; H=98; Q= 30 m3/hr Unit 107,504,000 -sda-
400 V
Grundfos SP5030-15,
Hz 3 x
Power Kwh 13; H=104; Q= 30 m3/hr Unit 110,372,000 -sda-
400 V 50 Hz

Panel Sumber Sibel C/W Water


MM 8,684,400 434,220 9,118,620
Lever Control Double Lengkap
1 0,55 - 1,5 Kwh 4,291,100 10,204,300 510,215 10,714,515
2 2,2 - 3 Kwh 5,028,750 9,067,600 453,380 9,520,980
NN Alat - Alat Bengkel 12,643,600 632,180 13,275,780
1 mesin Bubut Kayu Oscar Unit 5,247,350 - -
2 mesin Bubut Kayu Wipro Unit 1,749,050 4,086,800 204,340 4,291,140
3 Pisau Bubut Unit 1,166,000 4,789,300 239,465 5,028,765
4 mesin Kompresor Wipro Unit 3,206,700 - -
5 Gerenda Duduk Wipro Unit 1,166,000 4,997,500 249,875 5,247,375
6 Gergaji meja Wipro Unit 1,166,000 1,665,800 83,290 1,749,090
7 Bandsaw / Bensaw Wipro Unit 1,049,450 1,110,500 55,525 1,166,025
8 Jigsaw Wipro Unit 1,049,450 3,054,000 152,700 3,206,700
9 Planner Ketam Tangan Wipro Unit 874,500 1,110,500 55,525 1,166,025
10 Planner Ketam meja Wipro Unit 5,830,300 1,110,500 55,525 1,166,025
11 mesin Bor duduk Wipro Unit 2,332,150 999,500 49,975 1,049,475
12 mesin Bor Set 408,100
Mesin Bor Pohon Portable Unit 5,266,000
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
13 mata Bor 1 Set : 832,900 41,645 874,545
a. 1/4 " Wipro 14,050 5,552,700 277,635 5,830,335
b. 5/16 " Wipro 17,500 2,221,100 111,055 2,332,155
c. 3/8 " Wipro 26,750 388,700 19,435 408,135
d. 1/2 " Wipro 35,050 - -
e. 5/8 " Wipro 81,650 13,400 670 14,070
f. 3/4 " Wipro 151,600 16,700 835 17,535
14 Sprayer Cat Wipro Unit 174,900 25,500 1,275 26,775
15 Selang Plastik Wipro Unit 11,000 33,400 1,670 35,070
16 mesin Rempelas Wipro Unit 699,600 77,800 3,890 81,690
17 Insulation meter (Alat Ukur Tahanan Kyoritsu Unit 5,830,300 144,400 7,220 151,620
Isolasi Instalasi) 166,600 8,330 174,930
18 Tang meter (Alat Ukur Arus Listrik) Kyoritsu Unit 2,915,200 10,500 525 11,025
19 Eart meter (Alat Ukur Pertanahan Kyoritsu Unit 5,713,750 666,300 33,315 699,615
Penyalur Petir/Grounding) 5,552,700 277,635 5,830,335
20 Fanbelt : - -
- GenSet A - 55 bergigi Bando Buah 209,850 2,776,400 138,820 2,915,220
- Kompresor B -74 Bando Buah 81,650 5,441,700 272,085 5,713,785
- Breker Tester A - 55 Bando Buah 69,900 - -
Slag Letter dan Angka (Alat Cetak
22 Set 408,100 199,900 9,995 209,895
Huruf dan Angka)
23 Engkol Shock (Prohex) Set 1,010,200 77,800 3,890 81,690
24 Gergaji Besi Kapasitas beban 1000 - Buah 57,300 66,600 3,330 69,930
25 Mata Bor 2000 kg, max lifting Set 145,800 333,200 16,660 349,860
height min 1500 mm,
27 Hand Forklif Unit 15,392,150 962,100 48,105 1,010,205
Fork length min 900 mm,
Lifting course/rated min
OO PEMELIHARAAN KAPAL 15 mm/time 54,600 2,730 57,330
Body Kapal 138,900 6,945 145,845
1 Fiber Deck Set 6,360,450 284,600 14,230 298,830
2 Interior Plafon Kabin (Bekled) Set 2,332,150 14,659,200 732,960 15,392,160
3 Pintu Kabin Unit 1,325,100 - -
4 Bahan Pengecatan - -
a. Amplas 250 Lembar 3,250 6,057,600 302,880 6,360,480
b. Amplas 400 Lembar 3,250 2,221,100 111,055 2,332,155
RAB HARGA SURVEY
NO. Jenis Barang/Bahan/Upah Uraian SATUAN HARGA INFO
c. Amplas 600 Lembar 3,250 1,262,000 63,100 1,325,100
Galon 477,100 - - -
Kg 185,400 3,100 155 3,255
- Warna Biru Dongker Kg 105,000 3,100 155 3,255
- Warna Putih Kg 105,000 3,100 155 3,255
Kg 37,050 454,400 22,720 477,120
Sanpolac @ 3 kg Galon 68,850 176,600 8,830 185,430
Kg 159,050 100,000 5,000 105,000
Galon 106,050 100,000 5,000 105,000
II Perlengkapan Kapal Lainnya 35,300 1,765 37,065
1 Busi BR - 8 HS 10 Buah 63,600 65,600 3,280 68,880
2 Packing Set 583,050 151,500 7,575 159,075
3 Panel Elecktrik Set 583,050 101,000 5,050 106,050
4 Remote Kontrol Panel Set 5,830,300 - -
5 Wiper Set 1,775,650 60,600 3,030 63,630
HARGA BUPATI
USULAN 2018
(Rp.)

5,350
6,400
4,400
3,350
4,050
7,950
9,600

3,550
5,350
6,900
8,800
10,500
19,300
28,350

9,850
107,800
43,150

90,000 90,000
80,000 70,000
60,000
100,000 90,000
90,000 80,000
90,000 85,000
85,000 75,000
HARGA BUPATI
USULAN 2018
(Rp.)
85,000 80,000
85,000 50,000
100,000 90,000
90,000 80,000
110,000 110,000
100,000 100,000
80,000 60,000
75,000 75,000
50,000
105,000 105,000
110,000 110,000
150,000 150,000
45,000 45,000
90,000 80,000
100,000 90,000
90,000 75,000
100,000 85,000
90,000 75,000
90,000 90,000
100,000 80,000
2,500
85,000 70,000
90,000 80,000
65,000 60,000
65,000 60,000
65,000 52,500

10,255
10,000
8,785
186,550 186,550
209,000 209,000
209,000 209,000
HARGA BUPATI
USULAN 2018
(Rp.)
264,000 264,000
264,000 264,000
264,000 264,000
700 550
149,000 149,000
149,000 149,000
149,000 149,000
209,000 209,000
209,000 209,000
209,000 209,000
105,000 105,000
300,000 400,000
275,000 350,000
260,000 315,000
250,000 280,000
120,000 120,100
600
734,350
409,600
24,850
34,000
34,000
69,000
harga pemerintah
71,500
200,000 200,000
185,000 185,000
150,000 150,000
harga pemerintah
129,000 129,000
10,500 harga pemerintah
74,750
67,275
64,700
HARGA BUPATI
USULAN 2018
(Rp.)
92,600
93,000
108,000
141,750
315,000
3,700 3,700
80,500 80,500
13,340
10,350
316,000 316,000
108,000 108,000
1,430
259
127,850
harga pemerintah

10,000 10,120

300,000

138,000
207,000
276,000
14,375
94,300
17,250
33,607
193,200
402,500
196,318
4,312,500
HARGA BUPATI
USULAN 2018
(Rp.)
5,462,500

180,000
21,000
36,000
75,000
120,000
170,000
300,000
375,000
80,000
95,000

120,000

25,000
90,000
15,000
25,000
130,000
70,000
60,000
130,000
230,000
HARGA BUPATI
USULAN 2018
(Rp.)
46,000
46,000
51,750
15,525
23,575
47,725
15,525
7,763
18,975
6,900
24,725
20,125
32,583
12,938
186,875
66,125

7,000,000

95,833
57,500
172,500
37,250

126,500

27,025

25,875

16,100
16,100
5,175
96,313
HARGA BUPATI
USULAN 2018
(Rp.)
38,908
27,025
11,500
19,550
20,125
29,900
77,625
97,750
155,250
83,375
54,625
16,100
28,750
112,125
123,625
44,275
57,692
69,000
88,167
161,000
66,700
78,775
###
1,438
92,000
97,750
94,875
31,050
33,350

109,250
67,050
61,500
HARGA BUPATI
USULAN 2018
(Rp.)
53,000
60,000
54,000
49,000
47,000
56,800
52,350
###
###
###
###
132,150
###
###
239,050
262,350
70,200
45,000
49,600
51,600
53,700
57,200
60,000
69,750
73,200
4,000
4,150
4,300
4,500
4,600
21,200
22,700
24,200
18,500
HARGA BUPATI
USULAN 2018
(Rp.)
19,600
20,700
322,000
###
8,000

38,600
645,500
352,650
262,350
7,850
1,147,400
122,000
150,650
21,500
71,600
2,700
1,725,000
425,000
52,350
291,450
2,415,000
8,970,000
85,000

500
900
23,700
18,650
25,900
25,050
12,900
23,100
14,000
HARGA BUPATI
USULAN 2018
(Rp.)
8,500
1,050
33,600
14,000

3,090,150
17,000,000
17,500,000

102,000
89,750
7,550
90,000
75,050
223,000
390,000
390,000
950,000
1,425,000
3,500,000
332,000
372,000
497,500
637,000
1,550,000
3,500,000

20,968
16,215
11,308
7,188
HARGA BUPATI
USULAN 2018
(Rp.)
40,250
31,050
57,251
9,100
83,758
123,625
169,050
257,000
356,500
22,050
5,175
100,550
###
###
###
14,050
13,060
19,780
16,000
16,900
12,700
12,894
123,000
97,750
63,250
445,625
32,775
138,000
1,293,750

1,437,500

1,900,000
HARGA BUPATI
USULAN 2018
(Rp.)
2,075,000
645,000
635,000

718,750

595,000

550,000

23,000
32,800
41,000
###
83,000
33,500
1,700,000
550,000
700,000
33,500

30,475
75,000
30,000
32,775
23,000
21,563
11,500

805,000
874,000
902,750
HARGA BUPATI
USULAN 2018
(Rp.)
971,750
989,000
1,006,250
1,023,500
1,109,750
1,144,250
1,207,500
1,265,000

53,750
28,000
24,000
65,000
23,000
28,750
14,375
9,775
40,250
19,400
8,600
52,900
32,200
23,192
32,000
70,500
100,000

16,550
19,800

20,000
100,550
HARGA BUPATI
USULAN 2018
(Rp.)
7,500
45,000
40,250
75,600

70,850
273,125
42,167
50,150
1,408,150
517,500
143,750
210,833
66,700
115,000
143,750
92,000
200
110,000
160,000
300,000

82,500
129,650
182,800
341,950
406,850
32,000
32,000
37,000
36,000
HARGA BUPATI
USULAN 2018
(Rp.)
39,000
40,000
26,550
20,050
25,900
27,000
147,300
13,500
109,050
102,450
54,350
118,000
76,750
132,300
9,200
487,600
193,700
311,200
311,200
817,500
1,240,550
896,250
1,842,950
649,600
8,250
10,150
8,600
146,450
342,800
1,357,000
1,297,150
23,400
17,000
199,900
HARGA BUPATI
USULAN 2018
(Rp.)
118,300
76,750
395,000
4,900
3,550
6,600
5,000
5,100
3,850
7,000
13,200
5,100
4,050
2,300
5,100
4,050
8,250
5,100
4,400
17,100
87,350
113,250
132,150
696,150
1,615,200
765,850
2,172,000
48,150
218,700
48,150
251,250
48,150
222,250
55,200
HARGA BUPATI
USULAN 2018
(Rp.)
236,550
58,900
258,050
68,100
265,300
45,850
48,150
169,250
8,250
240,950
137,650
101,500
146,550
157,900
3,350
28,450
101,500
16,450
294,000
372,850
122,000
136,250
157,800
121,650
215,100
114,750
209,150
136,250
244,100
164,950
167,450
85,950
215,100
209,150
HARGA BUPATI
USULAN 2018
(Rp.)
244,100
167,450
5,450
28,450
###
78,300
68,000
149,300
189,300
39,550
35,350
233,700
129,000
82,500
12,450
291,450
8,700
3,250

233,200

1,750
16,550
29,500
44,900

122,500

4,600
633,550
174,900
411,900
87,450
3,350
637,450
16,900
HARGA BUPATI
USULAN 2018
(Rp.)
150,000
6,400
1,750
3,848,100
4,925,550
3,386,250
2,973,350
2,157,200
572,350
324,300
77,150
117,050
162,750
205,650
206,300
43,550
774,900
188,550
90,800
34,200
5,650
79,200
85,800
68,650
17,700
75,700
64,250
707,050
163,550
3,550
8,600
146,450
342,800
1,357,000
HARGA BUPATI
USULAN 2018
(Rp.)
435,750
14,800
767,750
331,350
331,350
69,900
70,650
850,600
3,899,550
8,600
19,500
289,900
116,550
412,750
816,150
1,850
900
262,500
210,000
599,600
14,705,250
###

###

2,016,000
186,950

900
100
100
100
162,375,950
HARGA BUPATI
USULAN 2018
(Rp.)
3,206,700
3,498,150
641,200
1,148,050
17,491,100
3,305,800
408,100
48,150
671,550
2,915,200
2,040,650
991,050
845,450
291,450
1,807,450
633,550
524,650
642,900
9,850
26,850
48,150
172,600
330,950
112,450
5,650
1,942,150
404,000
524,650
4,489,350
2,128,100
2,040,650
524,650
5,250
524,650
HARGA BUPATI
USULAN 2018
(Rp.)
60,650

2,915,200
291,450
87,450
174,900
157,350
1,101,950
419,750
110,750
64,150
419,750
314,750
116,550
116,550
99,200
174,900
145,800
145,800
64,150
11,750
17,500
14,700
8,700
8,700
12,250
145,800
419,750
314,750
314,750
116,550
600
HARGA BUPATI
USULAN 2018
(Rp.)
145,800
1,750

265,400
53,000
42,500
21,500
7,750
15,850
25,500
53,550
53,550
20,000
51,650
57,300
26,650
81,850
56,650
28,750
14,800
11,750
9,000
34,200
10,000
21,500
74,850
17,100
74,850
51,000
89,850
170,000
49,450
80,000
HARGA BUPATI
USULAN 2018
(Rp.)

39,750
51,200
57,850
107,600
78,850
23,300
21,500
97,500
16,000
16,000
5,250
1,250
3,850
1,550
92,000
97,750
95,000
3,350
10,600
2,100
5,100
3,450
11,750
6,800
7,450

7,450

97,100

90,800
HARGA BUPATI
USULAN 2018
(Rp.)
11,750
17,100
18,050
31,900
61,500
97,750
84,800
110,350
168,700
103,300
15,300
149,400
157,150
159,300
209,450
49,650
32,400
39,600
93,600
126,000
36,000
158,400
158,400
72,000
72,000
150,000
126,000
21,600
1,800
72,000
19,000

78,850
HARGA BUPATI
USULAN 2018
(Rp.)
109,050
115,350
102,650
109,250
38,500
192,450
102,650
192,450
122,000
122,000
147,600
322,000
21,500
21,500
59,700
61,950
74,000
168,300

85,950

85,950

53,950

53,950

63,000

63,000

43,050
46,600
60,900
HARGA BUPATI
USULAN 2018
(Rp.)
43,050
50,150
50,150
72,750
67,050
61,500
53,000
60,000
54,000
49,000
47,000
56,800
52,350
39,350
15,850
18,050
15,850
48,800
57,300
49,000
46,700
145,100
132,150
21,200
22,700
24,200
18,500
19,600
20,700
239,050
262,350
139,850
139,850
147,800
446,250
HARGA BUPATI
USULAN 2018
(Rp.)
446,250

38,600
645,500
352,650
262,350
158,550
85,450
106,750
181,850
2,415,000
2,518,500
2,403,500
805,950
1,147,400
122,000
150,650
116,550
74,850
21,500
71,600
2,700
502,000
52,350
291,450
1,575,000
984,350

900
23,700
18,650
25,900
13,000
HARGA BUPATI
USULAN 2018
(Rp.)
21,200
22,350
12,900
23,100
14,000

8,162,450
7,888,500
7,854,600
11,500,000
19,001,200
18,174,450
16,985,000
14,044,150
8,978,750
8,978,750
8,978,750
5,130,700
5,772,050
5,772,050
5,130,700
9,299,500
9,620,100
6,413,400
6,413,400
6,413,400
4,489,350
4,810,050
4,810,050
4,489,350
6,734,050
7,054,800
2,308,800
2,308,800
HARGA BUPATI
USULAN 2018
(Rp.)
1,924,000
3,848,100
5,451,350
5,451,350
5,451,350
3,848,100
4,168,700
4,168,700
3,848,100
5,772,050
6,092,800
20,000,000
6,023,850
12,900
8,925,000
8,925,000
9,344,450
9,652,800
26,400
14,400
12,000
42,000
26,400
18,000
80,400
45,600
34,800
114,000
66,000
54,000
192,000
96,000
72,000
276,000
HARGA BUPATI
USULAN 2018
(Rp.)
120,000
102,000
372,000
180,000
138,000
318,000
144,000
102,000
39,000
46,800
33,600
51,600
60,000
84,000
72,000
72,000
114,000
96,000
150,000
96,000
120,000
222,000
252,000

7,550
2,400,000
3,000,000
3,240,000
3,000,000
3,000,000
1,800,000
1,800,000
1,800,000
HARGA BUPATI
USULAN 2018
(Rp.)
1,800,000
1,800,000
1,800,000

1,800,000
2,040,000
2,040,000
2,040,000

2,040,000

2,040,000

2,040,000

2,040,000
54,000
66,000
90,000
96,000
105,000
168,000
240,000
78,000
150,000
264,000
223,000
390,000
390,000
950,000
1,425,000
3,500,000
HARGA BUPATI
USULAN 2018
(Rp.)
2,940,000
332,000
372,000
497,500
637,000
1,550,000
3,500,000
288,750
323,400
432,600
554,400
663,600
3,045,000
42,000
102,000
150,000
78,000
102,000
114,000

205,300
287,100
406,800
607,500
1,264,200
2,015,700
3,119,400
4,944,300
6,376,500
8,104,700
53,600
77,900
122,200
HARGA BUPATI
USULAN 2018
(Rp.)
192,100
270,300
390,100
585,600
1,232,100
1,967,200
3,054,400
4,861,800
180,900
238,000
352,700
495,000
1,037,200
1,642,000
2,600,600
4,042,800
5,245,800
6,632,000
39,342
62,365
70,714
106,100
156,400
221,700
321,700
474,000
1,006,900
1,596,000
2,538,800
3,964,200
242,100
344,700
484,000
722,800
HARGA BUPATI
USULAN 2018
(Rp.)
1,505,100
2,442,200
3,801,300
4,803,500
6,031,700
7,757,600
10,041,100
41,360
62,100
92,000
145,500
223,400
318,700
455,300
688,700
1,455,000
2,375,800
3,713,200
5,158,120
5,909,500
201,100
286,900
405,900
586,000
1,232,100
1,995,900
3,123,300
4,015,750
4,960,500
6,495,300
8,194,700
22,100
33,300
52,800
HARGA BUPATI
USULAN 2018
(Rp.)
85,000
124,500
182,800
261,400
377,900
553,000
1,183,400
1,932,200
3,038,300
3,903,000
4,843,100
231,900
327,800
460,800
686,800
1,423,700
2,302,600
3,576,000
5,666,900
7,286,100
9,426,600
25,410
37,620
60,800
88,700
139,400
214,400
303,500
434,000
655,000
1,376,900
2,240,500
3,493,700
5,552,600
HARGA BUPATI
USULAN 2018
(Rp.)
193,600
273,800
387,700
558,900
1,168,400
1,852,900
2,891,400
4,584,700
6,000,300
7,567,100
20,700
31,100
49,400
85,000
119,700
176,500
250,000
361,600
528,100
1,122,900
1,825,800
2,862,800
4,555,600
52,300
119,000
187,000
262,800
378,900
567,700
1,189,700
1,450,000
164,700
231,200
326,900
HARGA BUPATI
USULAN 2018
(Rp.)
478,300
997,200
1,574,500
103,400
152,200
215,600
312,500
459,800
972,600
1,536,200
216,378
443,005
665,123
1,395,743
2,174,743
3,377,785
5,378,585
8,739,048
212,790
431,730
649,235
1,378,420
178,145
363,465
537,100
1,145,335
1,767,408
2,758,275
4,405,450
7,083,058
172,200
359,980
522,648
1,121,248
HARGA BUPATI
USULAN 2018
(Rp.)
131,250
148,750
166,300
192,450
157,350
192,450
209,850
244,850
236,250
262,350
297,350
323,700
367,250
330,600
367,250
528,150
349,850
384,800
446,000
481,100
542,200
515,950
577,900
650,340
712,290
794,790
836,090
908,210
1,011,470
1,042,390
846,260
959,790
1,032,120
1,156,020
HARGA BUPATI
USULAN 2018
(Rp.)
1,238,630
1,238,630
1,352,150
1,517,260
1,620,620
1,785,720
1,971,680
2,208,900
2,363,730
2,601,060
2,756,100
3,682,940
6,646,600
8,955,450
10,039,950
56,600
91,600
163,200
199,850
67,400
6,450
5,708,550
7,845,020
10,570,100
11,850,250

21,200
16,350
11,400
7,450
40,400
31,150
57,300
HARGA BUPATI
USULAN 2018
(Rp.)
9,100
84,200
132,600
175,000
257,000
356,500
122,850
3,550
3,350
2,900
6,900
4,700
11,750
2,200
23,300
1,150
21,900
204,750
217,750
5,450
3,950
3,550
15,300
10,900
26,250
2,900
48,800
120,600
205,550
438,250
1,550
35,550
5,850
100,550
HARGA BUPATI
USULAN 2018
(Rp.)
###
###
3,950
4,380
4,810
5,450
8,450
11,020
275,400

30,850
65,000
95,000
175,000
45,000
75,000
95,000
20,550
16,000
279,900
1,632,500
19,300
19,300
32,775
12,700
12,700
20,450
10,250
33,500
40,200
56,150
221,400
258,900
HARGA BUPATI
USULAN 2018
(Rp.)
598,500
315,000
210,000
115,500
42,000
36,750
196,350
21,000
52,500
10,500
210,000
315,000
42,000
31,500
1,962,100

1,293,750

1,437,500

1,900,000

2,075,000
645,000
550,000
165,250

154,750
1,850
123,900
113,600
138,000
HARGA BUPATI
USULAN 2018
(Rp.)
635,000
718,750
595,000
550,000
722,800
826,100
33,050
5,450
4,200
1,550
172,200
1,150
31,500
1,749,050
654,150
###
###
30,850
52,900
350,150
109,600
101,500
20,050
278,250

23,400
33,900
42,500
46,600
57,300
27,150
HARGA BUPATI
USULAN 2018
(Rp.)
36,000
46,600
64,550
57,300
174,600
3,160,000
2,260,000
1,221,000
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
HARGA BUPATI
USULAN 2018
(Rp.)

309,750
211,950
196,750

247,800
232,750
217,550

275,400
260,250
245,050
333,450
141,000
83,450

19,300

64,150

57,720,700

19,240,300

44,893,900

26,087,450

42,000
HARGA BUPATI
USULAN 2018
(Rp.)
53,750
24,000
42,000
69,900
###
114,750
28,750
27,050
77,450
26,850
14,700
78,850
19,400
8,600
26,750
17,950
25,500
50,150
15,850
33,150
39,650
117,600

16,550
25,600
19,800
141,000
87,150
43,550
28,200

14,050
HARGA BUPATI
USULAN 2018
(Rp.)
32,000
7,750
20,550
123,895,350
116,607,500
5,830,300
55,971,600
106,345,950
1,415,150

163,150

93,532,200
57,915,150
46,162,600
34,632,450
36,775,050
50,345,250
8,075,000
6,879,900
7,594,100
10,450,950
13,371,950

14,657,450
25,915,950
1,317,600
38,866,350

41,650
HARGA BUPATI
USULAN 2018
(Rp.)

116,550
8,700
3,039,000

44,400
17,600
421,250
23,100
3,850
190,950
291,450
205,150

3,300
14,400
825,200
97,000
46,100
3,400
2,200
2,200

###

183,300

244,300

305,400
HARGA BUPATI
USULAN 2018
(Rp.)
244,300

305,400

366,500

244,800
153,000
42,300
448,500
511,800
766,700
888,300
1,041,000
19,100,300
28,650,400
38,200,600
47,750,600
66,851,000
76,401,100
2,081,300
4,162,800
8,325,700
10,407,200
336,600
367,300
428,500
428,500
612,200
HARGA BUPATI
USULAN 2018
(Rp.)
5,964,472,050
3,171,723,100
84,540,400
1,200,497,200
74,628,750
139,023,750
474,592,400
215,723,750
269,363,200
658,832,150
177,779,700
146,932,650
1,838,404,250
815,435,950
650,232,000
301,686,800
520,787,400
755,612,300
320,670,500
11,825,100
1,650,905,850
9,266,000
183,166,900
79,817,850
18,947,000
57,137,600
1,049,467,200
367,500,000
52,500,000
34,996,500
840,000,000
105,000,000
210,000
HARGA BUPATI
USULAN 2018
(Rp.)
1,050,000
26,250,000
5,775,000
6,825,000
1,312,500
13,125,000
10,500,000
13,650,000
7,350,000
38,850,000

31,110,000

34,960,900
15,849,000
43,453,200
7,647,150
22,440,450
28,663,600
2,157,200
192,450
844,300
6,355,100
10,057,300
122,437,750
HARGA BUPATI
USULAN 2018
(Rp.)
14,226,100

15,000
408,100
5,650
83,850
100,550
40,300

15,000,000

2,400
47,250
44,900
40,300
38,500
35,250
32,000
64,350
209,150
35,250
48,150
28,250
HARGA BUPATI
USULAN 2018
(Rp.)
1,528,650

75,600

70,850
24,250
649,400
643,750
1,106,250
147,200
4,693,350
502,950

301,650
705,350
897,850
114,450
320,650
101,850
43,550
42,800
42,800
3,356,400
47,000
53,550
201,150
1,408,150
44,300
15,200
109,500
4,100,000
1,750,000
HARGA BUPATI
USULAN 2018
(Rp.)

1,750,000

60,000

17,500
205,150
329,700
481,100
20,450
###
1,166,000
1,166,000
583,050
16,350
21,000
25,600
105,000
524,650
291,450
262,350
60,000
87,450
145,800
204,000
215,750
2,915,200
87,450
40,800
52,350
HARGA BUPATI
USULAN 2018
(Rp.)
874,500
874,500
43,000
495,600
577,150
693,800

495,600

489,700
105,600
37,350
37,350
11,550
1,399,200
1,865,700
104,450
8,050
200
186,550
113,700
33,900
66,450
60,150
214,600
31,350
48,900
###
18,650
8,700
105,000
346,500
10,250
145,800
87,450
HARGA BUPATI
USULAN 2018
(Rp.)
62,550
14,050
20,450
180,700
1,650
21,600
4,900
700
22,750
423,250
423,250
1,418,300
315,800
408,100
466,400
450,000
87,450
2,565,350

5,323,500

3,206,700

###

###
3,206,700
###
###
2,623,600
HARGA BUPATI
USULAN 2018
(Rp.)

###

###
###
###
###

###

2,623,600
###
###
###

###

964,650
179,150
3,445,300
2,048,250
735,000
6,700
73,800
30,200
75,700
40,300
41,550
18,750
56,250
26,750
67,050
HARGA BUPATI
USULAN 2018
(Rp.)
88,500
77,050
97,200
107,300
73,800
26,750
80,500
301,650
57,000
14,700
5,450
1,609,200
40,300
20,050
2,625,000
380,600
360,900
5,250,000
997,500
###
23,625,000
262,500
525,000
393,750
3,281,250
1,706,250
3,675,000

1,302,000
1,302,000
1,302,000
1,302,000
HARGA BUPATI
USULAN 2018
(Rp.)
1,302,000
1,302,000
1,302,000
1,302,000
1,302,000
1,302,000
1,302,000
1,302,000
1,302,000
160,200
198,000
###
630,000
179,850
34,353,000
###
###
###

46,442,000

###
HARGA BUPATI
USULAN 2018
(Rp.)

20,790,000

322,050
2,750
30,000,000
###
HARGA BUPATI
USULAN 2018
(Rp.)
###
###
###
###

858,000

###

3,432,000

###

40,000,000
HARGA BUPATI
USULAN 2018
(Rp.)

15,000,000

700,000

3,550,000

###

###

###

###

###

###

###
HARGA BUPATI
USULAN 2018
(Rp.)

###

###

###
###

###

###

###

###

###

###

###

###

3,550,000
HARGA BUPATI
USULAN 2018
(Rp.)

###

###

###

###

###

###

###

###

###

###

###

###
HARGA BUPATI
USULAN 2018
(Rp.)

###

###

###

###

###

###

###

1,150,000

10,000,000

9,000,000

7,600,000
12,500,000

4,350,000
HARGA BUPATI
USULAN 2018
(Rp.)

1,100,000

300,000
###
###
6,570,750
7,911,850
9,118,600
10,714,500
9,520,950
13,275,750
18,055,000
20,282,000
23,066,000
23,994,000
28,500,000
31,385,000
40,598,000
45,542,000
49,339,000
63,598,000
46,808,000
58,130,000
78,936,000
79,527,000
82,159,000
84,774,000
88,132,000
HARGA BUPATI
USULAN 2018
(Rp.)
90,630,000
93,009,000
100,855,000
103,825,000
95,051,000
85,095,000
87,997,000
90,883,000
95,034,000
99,759,000
107,504,000
110,372,000
###

4,291,100
5,028,750

5,247,350
1,749,050
1,166,000
3,206,700
1,166,000
1,166,000
1,049,450
1,049,450
874,500
5,830,300
2,332,150
408,100
5,266,000
HARGA BUPATI
USULAN 2018
(Rp.)
###
14,050
17,500
26,750
35,050
81,650
151,600
174,900
11,000
699,600
5,830,300
###
2,915,200
5,713,750
###
###
209,850
81,650
69,900
408,100
1,010,200
57,300
145,800
15,392,150
###

6,360,450
2,332,150
1,325,100
###
3,250
3,250
HARGA BUPATI
USULAN 2018
(Rp.)
3,250
477,100
185,400
105,000
105,000
37,050
68,850
159,050
106,050

63,600
583,050
583,050
5,830,300
1,775,650
XVII. STANDAR BAHAN DAN UPAH

HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
A Bahan Pembangunan
Amplas ukuran 9x11 merk brite Lembar 5,350
Amplas ukuran 9x11 merk nikken Lembar 6,400
Amplas ukuran 9x11 merk Flying whell Lembar 4,400
Amplas ukuran 9x11 merk Three star Lembar 3,350
Amplas ukuran 9x11 merk Duco Lembar 4,050
Amplas ukuran 9x11 merk 3M Lembar 7,950
Amplas 450 1M 9,600
B Kuas
Kuas Uk 1" RRT Buah 3,550
Kuas Uk 1,5" RRT Buah 5,350
Kuas Uk 2" RRT Buah 6,900
Kuas Uk 2,5" RRT Buah 8,800
Kuas Uk 3" RRT Buah 10,500
Kuas Uk 4" RRT Buah 19,300
Kuas Uk 5" RRT Buah 28,350
Kuas Uk 4" Buah 9,200
C Baut
Mur Baut 10x70 Buah 9,850
Palu Amer Ukuran Sedang Buah 107,800
Palu Konde Buah 43,150
D ONGKOS / UPAH KERJA
1 Kepala Tukang Batu oh(7jam) 90,000
2 Tukang Batu oh(7jam) 70,000
3 Pembantu Tukang Batu oh(7jam) 60,000
4 Kepala Tukang kayu oh(7jam) 90,000
5 Tukang Kayu oh(7jam) 80,000
6 Tukang kayu Setengah Terampil oh(7jam) 70,000
7 Kepala Tukang Cat oh(7jam) 85,000
8 Tukang Cat oh(7jam) 75,000
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
9 Mandor Tukang Gali Tanah oh(7jam) 50,000
10 Kepala Tukang Gali tanah oh(7jam) 75,000
11 Tukang Gali Tanah oh(7jam) 60,000
12 Kepala Tukang Besi oh(7jam) 80,000
13 Tukang Besi Terampil oh(7jam) 50,000
14 Tukang Besi setengah terampil oh(7jam) 85,000
15 Mandor Lapangan oh(7jam) 90,000
16 Juru ukur oh(7jam) 80,000
17 Kepala tukang oh(7jam) 75,000
18 Mandor lapangan oh(7jam) 90,000
19 Mekanik Terampil oh(7jam) 110,000
20 Operator terampil oh(7jam) 100,000
21 Pembantu operator oh(7jam) 60,000
22 Penganyam bronjong oh(7jam) 75,000
23 Penjaga malam oh(7jam) 50,000
24 Sopir personil oh(7jam) 105,000
25 Logistik oh(7jam) 110,000
26 Site manager oh 150,000
27 Geologis oh 45,000
28 Tukang kayu o/h 40,000
29 Kepala Tukang kayu o/h 75,000
30 Tukang las o/h 80,000
31 Kepala Tukang Las o/h 90,000
32 Tukang Pelitur o/h 75,000
33 Kepala Tukang Pelitur o/h 85,000
34 Tukang Bor o/h 75,000
35 Kepala Tukang Bor o/h 90,000
36 Tukang Listrik o/h 80,000
37 Penggalian lubang lubang 2,500
38 Tukang Pipa oh(7jam) 70,000
39 Kepala Tukang Pipa oh(7jam) 80,000
40 Pembantu Mekanik oh(7jam) 60,000
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
41 Pembantu Sopir oh(7jam) 60,000
42 Pekerja oh(7jam) 52,500
E BAHAN PASANGAN
1 Aspal 155 kg / drum m. 061 Kg 10,255
2 Aspal 50 kg/zak kg 9,100
3 Aspal Curah Kg 8,050
2 Aspal Curah m.10 Kg 10,000
3 Aspal Enulsi m.31 Kg 8,785
4 Aspal Drum Kg 9,750
5 Bahan Adetif Liter 124,000
6 Batu 0 - 1 (bulat) m3 99,200
7 Batu 1 -2 (bulat) m3 96,700
8 Batu 2 - 3 (bulat) m3 96,700
4 Batu Audesit Polos 10/20 m² 186,550
4 Batu Audesit Polos 15/30 m² 209,000
5 Batu Audesit Polos 20/40 m² 209,000
6 Batu Audesit Ulir 10/20 m² 264,000
6 Batu Audesit Ulir 15/30 m² 264,000
7 Batu Audesit Ulir 20/40 m² 264,000
8 Batu bata merah Buah
9 Batu Candi Polos 10/20 m² 149,000
asus:
8 Batu Candi Polos 15/30 m² 149,000
harga pemerintah
9 Batu Candi Polos 20/40 m² 149,000
10 Batu Candi Ulir 10/20 m² 209,000
asus:
10 Batu Candi Ulir 15/30 m² 209,000
harga pemerintah
11 Batu Candi Ulir 20/40 m² asus: 209,000
12 Batu gunung m3 harga pemerintah
105,000
13 Batu pecah 1 - 2 (mesin) m3 400,000
14 Batu pecah 2 - 3 (mesin) m. 024 m3 350,000
15 Batu pecah 3 - 5 m. 023 m3 315,000
16 Batu pecah 5 - 7 m. 022 m3 280,000
17 Batu Belah 15/20 m3 120,100
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
18 Filler / abu batu kg 600
19 Gemuk Pertamina Liter 28,450
20 Grosok pilihan (Berasan) m² 99,200
21 Jagungan (Batu jagungan) m² 96,700
22 Kapur gamping Ton 734,350
19 Kapur pasang m3 409,600
20 Kawat bronjong galvanis Kg 24,850
21 Kerikil Pecah m³ #DIV/0!
21 Minyak pelumas miditran S. 40 Liter 34,000
22 Minyak pelumas misran B. 40 Liter 34,000
23 Minyak Roled HD 90.140 Liter 69,000
24 Olie Hidrolis Toralix 52 Liter 71,500
25 Minyak tanah / Kerosin Liter 18,000
25 Pasir Ayak m³ 128,900
26 Pasir beton m. 041 m³ 200,000 #DIV/0!
asus:
27 Pasir pasang m³ 185,000
harga pemerintah #DIV/0!
28 Pasir urug m. 040 m³ 150,000 #DIV/0!
29 Premium Liter 7,050
30 Sirtu m. 042 m³ 129,000 #DIV/0!
31 Solar Liter 5,650 81,250
32 Stempet Kg 74,750
32 Semen Bosowa 40 Kg Zak 57,200
32 Semen Bosowa 50 Kg Zak 74,750
33 Semen Gresik 40 kg/zak (m. 080) Zak 67,275
34 Semen Gresik 50 kg/zak (m. 080) Zak 67,200
35 Semen Holcim 40 Kg Zak 57,750
36 Semen Holcim 50 Kg Zak 74,400
37 Semen Puger 50 Kg Zak 60,900
38 Semen Puger 40 Kg Zak 48,300
34 Semen Tiga Roda 40 Kg Zak 64,700
35 Semen Tiga Roda 50 Kg Zak 75,600
36 Semen Warna 40kg Zak 92,600
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
37 Tanah urug m³ 93,000
38 Urugan Pilihan m³ 108,000
asus:
39 Batu Krikil M3 #DIV/0!
262.500 ?
39 Batu Marmer M2 450,000
40 Bata Merah biji 550
41 Batako 36 x 20 x 10 biji 3,700
42 Koral Sikat zak 80,500
43 Bata Ringan (Exterior) 60x20x10 60x20x10 biji 13,340
44 Bata Ringan (Interior) 60x20x7.5 60x20x7.5 biji 10,350
45 Batu Raen m3 316,000
46 Tasirtu (timbunan biasa) m3 108,000
47 Semen PC kg 1,430
48 Batu Pecah kg 259.25
49 Tanah Isian kg 127,850
50 Pertamax liter 8,450
F BAHAN PASANGAN LAINNYA
1 Biaya pasang Geo membrane Kg 10,120
2 Biaya pasang Geo textile Kg 9,100
3 Geo membrane type HDPE, tebal = 0,75 mm Kg 8,050
4 Geo membrane type HDPE, tebal = 1,00 mm Liter 124,000
5 Geo membrane type HDPE, tebal = 1,50 mm m³ 99,200
6 Geo membrane type HDPE, tebal = 2,00 mm m³ 96,700
7 Geo textile non waven type UNW-150, tebal = 1,00 mm m³ 96,700
8 Geo textile non waven type UNW-200, tebal = 1,20 mm m³ 128,900
9 Geo textile non waven type UNW-250, tebal = 1,50 mm Buah 500
10 Geo textile non waven type UNW-300, tebal = 1,70 mm Kg 1,350
11 Geo textile waven type UW-150, tebal = 0,5 mm Liter 28,450
12 Geo textile waven type UW-200, tebal = 0,6 mm m² 99,200
13 Geo textile waven type UW-250, tebal = 0,7 mm m² 96,700
14 Water ruber stop Ton 734,350
2 Versicel 300,000
G BAHAN PASANGAN LAINNYA
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
1 Biaya pasang Geo membrane m² 17,500
2 Biaya pasang Geo textile m² 2,300
3 Geo membrane type HDPE, tebal = 0,75 mm m² 32,550
4 Geo membrane type HDPE, tebal = 1,00 mm m² 45,450
5 Geo membrane type HDPE, tebal = 1,50 mm m² 57,200
6 Geo membrane type HDPE, tebal = 2,00 mm m² 69,900
7 Geo textile non waven type UNW-150, tebal = 1,00 mm m² 9,850
8 Geo textile non waven type UNW-200, tebal = 1,20 mm m² 11,000
9 Geo textile non waven type UNW-250, tebal = 1,50 mm m² 13,500
10 Geo textile non waven type UNW-300, tebal = 1,70 mm m² 15,200
11 Geo textile waven type UW-150, tebal = 0,5 mm m² 9,850
12 Geo textile waven type UW-200, tebal = 0,6 mm m² 11,750
13 Geo textile waven type UW-250, tebal = 0,7 mm m² 13,500
14 Water ruber stop m' 349,850
G ALAT BANTU
1 Alat pelancip / pisau besar Buah 16,450
2 Angkutan Linning Beton Plat Buah 900
3 Bodem 5 kg Buah 93,100
4 Cetok Buah 10,600
5 Ganco Buah 35,800
6 Gergaji kayu Buah 57,300
7 Gunting pemotong baja Buah 24,000
8 Keranjang Buah 11,300
9 Kereta dorong Unit 329,800
10 Kunci pembengkok tulangan Buah 10,350
11 Linggis Buah 34,000
12 Meteran 50 m Buah 93,100
13 Palu / martil Buah 21,500
14 Pemadat timbunan (Vibro Roller/stamper) Unit / m² 6,400
15 Pintu klep Unit 39,750
16 Tang pemotong kawat Buah 14,150
17 Timba Buah 10,600
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
18 Timbris Unit 6,400
1 Mollen beton (sewa) Unit / Hr 138,000
2 Pesawat ukur (sewa) Unit/Hari 207,000
3 Sewa Excavator Unit / Jam 276,000
4 Trucuk/bambu (3 m) Buah 14,375
5 Vibrator beton (sewa) Unit/Hari 94,300
6 scafolding (sewa) Unit/Hari 17,250
7 Mesin Poles/Slep (sewa) Unit/Hari 33,607
8 Sewa Buldozer Unit/jam 193,200
9 Sewa Dumptruck Unit/jam 402,500
10 Sewa Jack Hammer unit/hari 196,318
11 Pompa Beton Standar (sewa) unit/hari 5,175,000
12 Pompa Beton Longbow (sewa) Longbow unit/hari 6,612,500
H BAHAN LISTRIK (DATA DARI DINAS KEBERSIHAN DAN PERTAmANAN)
1 Asesoris Ornamaen Buah 180,000
2 Baut Stenlis 7/16 Buah 21,000
3 Begel Stel 36,000
4 Dop mercury 125 watt Philips Buah 75,000
5 Dop mercury 250 watt Philips Buah 120,000
6 Dop mercury 400 watt Philips Buah 170,000
7 Dop Natrium 250 watt Philips Buah 300,000
8 Dop Natrium 400 watt Philips Buah 375,000
1 ESENSIAL 13 W / DULUX EE (OSRAM) OSRAm Pcs 32,000
2 ESENSIAL 14 W, PHILIPS PHILIPS Pcs 32,000
3 ESENSIAL 16 W / DULUX EE (OSRAM) OSRAm Pcs 37,000
4 ESENSIAL 17 W / DULUX EE (OSRAM) OSRAm Pcs 36,000
5 ESENSIAL 20 W / DULUX EE (OSRAM) OSRAm Pcs 39,000
6 ESENSIAL 23 W / DULUX EE (OSRAM) OSRAm Pcs 43,000
7 ESENSIAL 5 W / DULUXSTAR (OSRAM) OSRAm Pcs 23,000
8 ESENSIAL 5 W, PHILIPS PHILIPS Pcs 18,000
9 ESENSIAL 8 W, PHILIPS PHILIPS Pcs 22,000
10 ESENSIAL 9 W / DULUXSTAR (OSRAM) OSRAm Pcs 27,000
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
11 Foto relay 6 Ampere Buah 147,300
12 Isolasi band Buah 13,500
13 Kabel NYF GBY 4 x 10 m 109,050
14 Kabel NYF GBY 4 x 16 m 102,450
15 Kabel NYF GBY 4 x 2 1/2 m 54,350
16 Kabel NYF GBY 4 x 4 m 118,000
17 Kabel NYF GBY 4 x 6 m 76,750
18 Kabel PVC Roll 132,300
19 Kabel Tuistit 2 x 20 m 9,200
20 Kabel NYA 1000 volt 4 mm Roll 487,600
21 Kabel NYA 1000 volt 1,5 mm Roll 193,700
22 Kabel NYA 1000 volt 2,5 mm Roll 311,200
23 Kabel NYA 2,5 mm (LmK) Buah 311,200
24 Kabel NYA 2,5 mm x 2 (LmK) Roll 817,500
25 Kabel NYY 2 x 2,5 mm LmK Roll 1,240,550
26 Kabel NYY 2,5 x 2 mm Roll 896,250
27 Kabel NYY 4 x 2,5 mm Roll 1,842,950
28 Kabel NYY 1000 volt 1,5 mm (LmK) general Roll 649,600
29 Kabel Twisted 2 X 10 m' 8,250
30 Kabel Twisted 2 X 16 m' 10,150
31 Kabel TC 2 x 10 mm meter 8,600
32 Kabel PVC 2 x 1 mm Roll 146,450
33 Kabel NYY 2,5 mm Roll 342,800
34 Kabel NYY 2 x 2,5 mm Roll 1,357,000
35 Kap Lampu 250 watt / 220 V merk GS Unit 1,297,150
36 Klem kabel Tuistit Buah 23,400
37 Konektor kabel Buah 17,000
38 Kotak Pengaman Buah 199,900
39 Kotak sekering khusus LPJU Unit 118,300
40 Lampu baret Set 76,750
41 Lampu HPIT Buah 395,000
42 Lampu PIJAR 10 W, GE GE Pcs 4,900
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
43 Lampu PIJAR 10 W, PHILIPS PHILIPS Pcs 3,550
44 Lampu PIJAR 100 W, GE GE Pcs 6,600
45 Lampu PIJAR 100 W, PHILIPS PHILIPS Pcs 5,000
46 Lampu PIJAR 25 W, GE GE Pcs 5,100
47 Lampu PIJAR 25 W, PHILIPS PHILIPS Pcs 3,850
48 Lampu pijar 25 watt, 40 watt Buah 7,000
49 Lampu pijar 25, 40, 75 / 220 V Set 13,200
50 Lampu PIJAR 40 W, GE GE Pcs 5,100
51 Lampu PIJAR 40 W, PHILIPS PHILIPS Pcs 4,050
52 Lampu PIJAR 5 W PHILIPS Pcs 2,300
53 Lampu PIJAR 60 W, GE GE Pcs 5,100
54 Lampu PIJAR 60 W, PHILIPS PHILIPS Pcs 4,050
55 Lampu pijar 60 watt, 100 watt Buah 8,250
56 Lampu PIJAR 75 W, GE GE Pcs 5,100
57 Lampu PIJAR 75 W, PHILIPS PHILIPS Pcs 4,400
58 Lampu SELANG mtr 17,100
11 Lampu TL 1 x 40 Philips Buah 80,000
12 Lampu TL 20 W/220 V Komplit balas,kaca (philips) Set 95,000
13 Lampu TL 40 W/220 V Komplit balas,kaca (philips) Set 120,000
70 MCB 60 A Buah 696,150
71 MCB 60 A - SN 65 Buah 1,615,200
72 MCB 80 A Buah 765,850
73 MCB 80 A - SN 80 Buah 2,172,000
74 MCB 10A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 48,150
75 MCB 10A 3 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 218,700
76 MCB 16A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 48,150
77 MCB 16A 3 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 251,250
78 MCB 20A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 48,150
79 MCB 20A 3 PHASE, ( MERLIN GERIN ) MERLIN GERIN Pcs 222,250
80 MCB 25A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 55,200
81 MCB 25A 3 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 236,550
82 MCB 32A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 58,900
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
83 MCB 32A 3 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 258,050
84 MCB 40A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 68,100
85 MCB 40A 3 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 265,300
86 MCB 4A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 45,850
87 MCB 6A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs 48,150
88 Piting Mercury Buah 169,250
89 Pitingan TL 40 watt Buah 8,250
90 Plendes Stel 240,950
91 Relay 15 A Buah 137,650
92 Sekering kas lokal 1 group Buah 101,500
93 Sekering kas lokal 2 group Buah 146,550
94 Sekering kas lokal 3 group Buah 157,900
95 Servis Kabel Buah 3,350
14 Skakelar (Broco) Engkel Buah 25,000
15 Skakelar / Handel Buah 90,000
16 Skakelar broco seri Buah 15,000
99 SON - H 220 W PHILIPS PHILIPS Pcs 294,000
100 SON - H 350 W PHILIPS PHILIPS Pcs 372,850
101 SON - T 150 W PHILIPS PHILIPS Pcs 122,000
102 SON - T 250 W PHILIPS PHILIPS Pcs 136,250
103 SON - T 400 W PHILIPS PHILIPS Pcs 157,800
104 SON - T 70 W PHILIPS PHILIPS Pcs 121,650
105 SON 150 W (LU150/100/D/E/40), GE Pcs 215,100
106 SON 150 W, PHILIPS PHILIPS Pcs 114,750
107 SON 250 W (250/D/E/40), GE Pcs 209,150
108 SON 250 W, PHILIPS PHILIPS Pcs 136,250
109 SON 400 W (LU400//D/E/40), GE Pcs 244,100
110 SON 400 W, PHILIPS PHILIPS Pcs 164,950
111 SON 70 W (LU70/90/D/E/27), GE Pcs 167,450
112 SON 70 W, PHILIPS PHILIPS Pcs 85,950
113 SON-T 150 W (LU150/100/T/E/40), GE Pcs 215,100
114 SON-T 250 W (LU250/T/E/40), GE Pcs 209,150
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
115 SON-T 400 W (LU400/T/E/40), GE Pcs 244,100
116 SON-T 70 W (LU70/90/T/12/E/27), GE Pcs 167,450
117 Stater TL 40 watt Buah 5,450
17 Stop Kontak (Broco) Buah 28,750
18 Instalasi Stop kontak Buah 149,500
19 Tabung TL 40 watt (Philips) Buah 70,000
20 Tabung TL 40 watt (Tens) Buah 60,000
21 Instalasi Titik Lampu Buah 149,500
123 Trafo 250 watt Buah 189,300
124 Trafo 40 watt sinar Buah 39,550
125 Trafo 40 watt Tens Buah 35,350
126 Trafo 400 watt Buah 233,700
127 Trafo mercury 125 watt Buah 129,000
128 WD Kap TL 40 watt khusus LPJU Buah 82,500
129 Yogo Buah 12,450
130 Sewa Truck Crane Unit/Hari 291,450
131 Sewa Alat bantu penerangan jalan umum Jam 8,700
132 Sewa alat bantu Roll pipa Roll/Jam 3,250
133 Sewa mesin bor u/ pemasangan kabel bawah tanah Unit/Hari 233,200
134 Pemasangan dan penarikan kabel m 1,750
135 Roll pipa 2" Unit 16,550
136 Roll pipa 3" Unit 29,500
137 Roll pipa 4" Unit 44,900
138 Pembuatan dan Pemasangan terminal dlm tiang Unit 122,500
139 Baut Baja ( Ring + mur ) stel 4,600
140 Kotak meter / Box panel Buah 633,550
141 Lampu mL-10 watt ( Lampu LHE) Lengkap Set 174,900
142 mC 25 Ampere Buah 411,900
143 PerakitanLampu Pertiang Unit 87,450
144 Tarikan kabel/Service Buah 3,350
145 Tiem Switch Unit 637,450
146 Terminal Kabel WK 25 mm Buah 16,900
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
147 Time Switch / Photocell Unit 150,000
148 Kawat seling m 6,400
149 Upah tarikan kabel m 1,750
150 Tiang oktagonal 8 m' Singgle orn Hot dipped Galvanized Batang 3,848,100
151 Tiang oktagonal 8 m' Double orn Hot dipped Galvanized Batang 4,925,550
152 Tiang oktagonal 7 m' Singgle orn Hot dipped Galvanized Batang 3,386,250
153 Lampu HPS 250 watt ( Lampu HE ) lengkap Premium Unit 2,973,350
154 Lampu HPS 250 watt ( Lampu HE ) lengkap Standar Unit 2,157,200
155 Grounding Set 572,350
156 SON H 250 Watt meter 324,300
157 Dop merkury ml 100 watt Buah 77,150
158 Dop merkury ml 250 watt Buah 117,050
159 Dop merkury ml 500 watt Buah 162,750
160 Son T 250 Buah 205,650
22 Esensial 23 watt Buah 40,250
162 Travo 250 Watt mercury Buah 206,300
163 Travo 40 Watt Buah 43,550
164 mC 50 A Buah 774,900
165 Fitingan mercury 250 Watt Buah 188,550
166 WD Kap Lampu 40 Watt Khusus LPJU Buah 90,800
167 TDL 36 Watt Buah 34,200
168 Starter S-20 Buah 5,650
23 MCB 20 A Buah 79,200
24 MCB 25 A Buah 85,800
25 MCB 32 A Buah 68,650
172 Konektor Kabel Buah 17,700
173 Kapasitor 25 UF 250 V Buah 75,700
174 Ignitor SN 58 Buah 64,250
175 Time Switch Buah 707,050
176 Foto Cell 6 A Selcon Buah 163,550
177 Tarikal kabel Buah 3,550
178 Kabel TC 2 x 10 mm meter 8,600
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
179 Kabel PVC 2 x 1 mm Roll 146,450
180 Kabel NYY 2,5 mm Roll 342,800
181 Kabel NYY 2 x 2,5 mm Roll 1,357,000
26 Lampu HPIT 400 Watt Roll 435,750
183 Isolasi Unibal Buah 14,800
184 Tang Amper Buah 767,750
185 Tang proton Buah 331,350
186 Obeng proton Buah 331,350
187 Engkol Inggris Buah 69,900
188 Kap Piring Dop mercury 250 Watt Buah 70,650
189 mC 80 A Buah 850,600
190 Sabuk Pengaman Buah 3,899,550
191 Fitingan TL 40 Watt Set 8,600
192 Testpen Buah 19,500
193 Avometer Buah 289,900
194 Box MCB 12 grup Buah 116,550
195 ELCB 3 x 40 A 1 Pahse Buah 412,750
196 ELCB 3 x 25 A 3 Pahse Buah 816,150
197 TEE Dos Buah 1,850
198 In Bodos Buah 900
22 Lampu TL RMI 2 x 20 watt reflektor Set 431,250
23 Lampu Downlight haogen 20 watt + Travo Set 212,750
I BAHAN INSTALASI LISTRIK -
1 BP VA 900
2 JILP VA 100
3 SLO VA 100
4 Gambar Instalasi VA 100
5 ATS 197 KVA Unit 162,375,950
6 Battery Charger Unit 3,206,700
7 Battery Accu Unit 3,498,150
8 Dudukan Accu Unit 641,200
9 Panel KWH Buah 1,148,050
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
10 Box Panel Buah 17,491,100
11 Saklar 630 A Buah 3,305,800
12 Plat Cooper 2,5 mm x 3 cm meter 408,100
13 Skun Kabel 150 mm Buah 48,150
14 Grounding dan BC 50 mm Set 671,550
15 mCCB 250 A Buah 2,915,200
16 mCCB 100 A Buah 2,040,650
17 ELCB 500 mA Buah 991,050
18 ELCB 300 mA Buah 845,450
19 Plat Cooper 0,5 mm dan Isolatror meter 291,450
20 Lampu Kontrol dan Ampere Set 1,807,450
21 Sub Panel Kontrol Uk. 40 x 60 x 90 Buah 633,550
22 Sub Panel Kontrol Uk. 20 x 80 x 60 Buah 524,650
23 Grounding dan BC 25 mm Set 642,900
24 Skun Kabel 10 - 25 mm Buah 9,850
25 Skun Kabel 50 - 75 mm Buah 26,850
26 MCB 10 - 20 A 1 Phase Buah 48,150
27 Kabel NYY 1 x 150 mm meter 172,600
28 Kabel NYY 4 x 70 mm meter 330,950
29 Kabel NYY 4 x 10 mm meter 112,450
30 Kabel NYY 1 x 6 mm meter 5,650
31 Tiang 9 meter Buah 1,942,150
32 Konstruksi TR meter 404,000
33 Box Panel 60 x 80 cm Buah 524,650
34 mCCB 400 A Buah 4,489,350
35 mCCB 160 A Buah 2,128,100
36 mCCB 100 A Buah 2,040,650
37 ELCB 40 A Buah 524,650
38 Baut 8 mm Buah 5,250
39 Box Panel 20 x 80 x 60 Buah 524,650
40 Kabel TC 2 x 70 + 1 x 50 meter 60,650
K UPAH PENGERJAAN BAHAN INSTALASI LISTRIK -
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
1 ATS 197 KVA Unit 2,915,200
2 Battery Charger Unit 291,450
3 Battery Accu Unit 87,450
4 Dudukan Accu Unit 174,900
5 Panel KWH Buah 157,350
6 Box Panel Buah 1,101,950
7 Saklar 630 A Buah 419,750
8 Plat Cooper 2,5 mm x 3 cm meter 110,750
9 Skun Kabel 150 mm Buah 14,700
10 Grounding dan BC 50 mm Set 64,150
11 mCCB 250 A Buah 419,750
12 mCCB 100 A Buah 314,750
13 ELCB 500 mA Buah 116,550
14 ELCB 300 mA Buah 116,550
15 Plat Cooper 0,5 mm dan Isolatror meter 99,200
asus:
16 Lampu Kontrol dan Ampere Set 174,900
pengairan : 989.000
17 Sub Panel Kontrol Uk. 40 x 60 x 90 Buah asus: 145,800
pengairan : 1.023.500
asus:
18 Sub Panel Kontrol Uk. 20 x 80 x 60 Buah 145,800
pengairan : 1.109.750
19 Grounding dan BC 25 mm Set 64,150
20 Skun Kabel 10 - 25 mm Buah 2,400
21 Skun Kabel 50 - 75 mm Buah 11,750
22 MCB 10 - 20 A 1 Phase Buah 11,750
23 Kabel NYY 1 x 150 mm meter 17,500
24 Kabel NYY 4 x 70 mm meter 14,700
25 Kabel NYY 4 x 10 mm meter 8,700
26 Kabel NYY 1 x 6 mm meter 8,700
27 Tiang 9 meter Buah 365,600
28 Konstruksi TR meter 12,250
29 Box Panel 60 x 80 cm Buah 145,800
30 mCCB 400 A Buah 419,750
31 mCCB 160 A Buah 314,750
32 mCCB 100 A Buah 314,750
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
33 ELCB 40 A Buah 116,550
34 Baut 8 mm Buah 600
35 Box Panel 20 x 80 x 60 Buah 145,800
36 Kabel TC 2 x 70 + 1 x 50 meter 1,750
J BAHAN PENGGANTUNG
1 Door Closer Buah 265,400
2 Door Holder Buah 53,000
3 Door Stop Buah 42,500
4 Engsel angin Buah 21,500
5 Engsel H Stl 7,750
5 Engsel jendela Buah 15,850
6 Engsel jendela Aluminium stenlees Unit 67,050
8 Engsel Kuningan Arch asli Stel 25,500
9 Engsel Nylon ARCH asli (Jendela) Set 53,550
10 Engsel Nylon ARCH asli (pintu) Set 53,550
7 Engsel pintu Buah 23,000
8 Engsel pintu Aluminium biasa Unit 51,650
9 Engsel pintu Aluminium stenlees Unit 57,300
10 Espanyolet Buah 46,650
11 Engsel Pintu 4 " 4" Buah 21,000
12 Engsel jendela 3" 3" Buah 16,000
13 Grendel Jendela Buah 8,000
14 Gembok Buah 28,750
15 Grendel Bj 14,800
20 Grendel biasa (besar) Buah 11,750
21 Grendel biasa (kecil) Buah 9,000
16 Grendel jendela Aluminium biasa Buah 21,275
17 Grendel jendela Aluminium mutu baik Buah 36,800
18 Grendel pintu Unit 20,125
19 Grendel tanam Set 32,583
20 Hak angin 44 mm (lurus) Buah 12,938
21 Hak angin besar Buah 21,500
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
28 Kunci Anchor 2 x putar Buah 74,850
29 Kunci knip Buah 17,100
22 Kunci 2 x putar Union Buah 80,500
23 Kunci pintu Aluminium Buah 186,875
24 Kunci selot Buah 66,125
25 Kunci silinder Buah 95,833
26 Kunci tanam (808) Bj 57,500
27 Kunci tanam besar 2 x putar kuda terbang Bj 82,417
28 Kunci tanam besar 2 x putar medico Bj 172,500
29 Kunci tanam kamar mandi Bj 41,783
30 Pegangan pintu Buah 84,333
K BAHAN LANGIT-LANGIT
1 Asbes datar tebal 4 mm (60 x 200) Lembar 39,750
2 Asbes datar tebal 5 mm (60 x 200) Lembar 51,200
3 Asbes datar tebal 6 mm (40 x 200) Lembar 57,850
1 Asbes gelombang besar tebal 5 mm (3,05 x 1,05) Lembar 126,500
2 Asbes gelombang kecil tebal 4 mm (3,05 x 1,05) Lembar 78,850
3 Asbes wuwung gelombang besar tebal 5 mm Lembar 27,025
4 Asbes wuwung gelombang kecil tebal 4 mm Lembar 25,875
5 Eeternite Ex Kerang Lembar 16,100
6 Eternite Sakura Lembar 16,100
7 Genteng Beton Bj 5,250
8 Genteng flam pres jawa / lokal Bj 1,250
9 Genteng Kr. Pilang / Wisma Bj 3,850
10 Genteng Kr. Pilang Lokal Bj 1,550
11 Genteng Kr. Pilang Bima Ambulu Bj 3,350
12 Genteng Palentong Bj 2,100
13 Genteng Type Perancis/ moronda Bj 2,100
14 Genteng Nok Palentong Bj 5,100
12 Genteng Wuwung Flam Pres Lokal Bj 3,450
13 Genteng Wuwung Kr. Pilang Wisma Bj 11,750
14 Genteng Wuwung Kr. Pilang Lokal Bj 6,800
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
15 Genteng Wuwung Kr. Pilang Bima Ambulu Bj 7,450
16 Genteng Wuwung Type Perancis/ moronda Bj 7,450
16 Gypsum board 9 mm merk Elephant uk. 1,20 x 2,40 m Lembar 96,313
17 Gypsum board 9 mm merk Indal uk. 1,20 x 2,40 m Lembar 91,425
18 Hardplek 1 x 2 m Lembar 38,908
19 List gypsum besar m' 27,025
20 Nok Genteng Beton Bj 11,500
28 Nok Stel Gelombang Lembar 19,550
21 Plat asbes tebal 3,5 mm (1,00 x 1,00) Lembar 19,550
22 Plat asbes tebal 4 mm (1,00 x 1,00) Lembar 20,125
23 Plat asbes tebal 5 mm (1,00 x 1,00) Lembar 29,900
32 Plywood tebal 4 mm (0.40 x 0.80) (0,40 x 0,80) Lembar 77,625
24 Plywood tebal 4 mm (1,22 x 2,44) Lembar 77,625
25 Plywood tebal 6 mm (0,40 x 0,80) Lembar 97,750
26 Plywood tebal 9 mm (1,22 x 2,44) Lembar 155,250
36 Seng Gelombang Lembar 103,300
27 Seng BJLs 28/ 0,9 x 1,8 Lembar 54,625
28 Seng BJLs 20/ 0,9 x 1,8 Lembar 46,200
29 Seng BJLs 20/ 45 cm m' 16,100
30 Seng BJLs 30/ 60 cm m' 28,750
31 Teakwood tebal 4 mm (1,10 x 2,10) Lembar 112,125
32 Teakwood tebal 4 mm (1,22 x 2,44) Lembar 123,625
33 Triplek tebal 3 mm (1,10 x 2,10) Lembar 44,275
34 Triplek tebal 3 mm (1,22 x 2,44) Lembar 57,692
35 Triplek tebal 4 mm (0,90 x 2,00) Lembar 69,000
36 Triplek tebal 4 mm (1,20 x 2,40) Lembar 88,167
37 Multiplek tebal 9 mm (1,22 x 2,44) Lembar 161,000
38 Kalsiboard 4 mm Lembar 66,700
39 Kalsiplank 9 mm Lembar 78,775
40 Serbuk Gypsum kg 1,438
41 Genteng Metal Roof + Insulin isodec m2 92,000
42 Genteng Metal Roof 0.3 mm isodec m2 97,750
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
43 Genteng Zincalume 0.3 mm Wina m2 94,875
44 Nok Genteng Metal Roof m' 31,050
45 Nok Samping Metal Roof m' 33,350
L BAHAN TEmPEL LANTAI DAN DINDING
1 Batu paras m² 78,850
1 Batu alam/ palimanan m² 109,050
2 Batu tempel hitam/ candi 15/30 m² 115,350
4 Batu tempel hitam/ candi 10/20 m² 102,650
3 Batu Lempeng 10/20 m² 109,250
6 Batu Lempeng Acak m² 38,500
7 Batu Andesit Bakar 10/20 m² 192,450
8 Batu Liforigreen 10/20 m² 102,650
9 Batu Alur Candi m² 192,450
10 Batu marmer Bakar Pink 10/20 m² 122,000
11 Batu marmer Bakar Pink 15/15 m² 122,000
12 Batu marmer Bakar Pink 15/30 m² 147,600
13 Kanstin beton 10 x 20 x 40 cm Buah 21,500
14 Kanstin beton 15 x 30 x 40 cm Buah 21,500
15 Keramik wafel 10 x 20 (KW. 1) biru m² 59,700
16 Keramik wafel 20 x 20 (KW. 1) biru m² 61,950
17 Keramik wafel 30 x 30 (KW. 1) milan m² 74,000
18 Paving stone persegi abu-abu tebal 10 cm halus m² 85,950
19 Paving stone persegi abu-abu tebal 10 cm kasar m² 85,950
20 Paving stone persegi abu-abu tebal 6 cm halus m² 53,950
21 Paving stone persegi abu-abu tebal 6 cm kasar m² 53,950
22 Paving stone persegi abu-abu tebal 8 cm halus m² 63,000
23 Paving stone persegi abu-abu tebal 8 cm kasar m² 63,000
24 Paving Stone segi enam tebal 5 cm m² 43,050
25 Paving stone segi enam 6 cm halus m² 46,600
26 Paving stone segi enam tebal 8 cm halus m² 60,900
27 Roster 12x11x24 cm Buah 43,050
4 Tegel Badag Merah 30/30 m² 50,150
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
5 Tegel Badag Hitam 30/30 m² 50,150
6 Tegel keramik 10 x 20 cm motif m² 72,450
7 Tegel keramik 10 x 20 cm polos m² 67,050
8 Tegel keramik 20 x 20 cm motif m² 61,500
9 Tegel keramik 20 x 20 cm polos m² 53,000
10 Tegel keramik 20 x 25 cm motif m² 60,000
11 Tegel keramik 20 x 25 cm polos m² 54,000
12 Tegel keramik 30 x 30 cm motif m² 49,000
13 Tegel keramik 30 x 30 cm polos m² 47,000
14 Tegel keramik 40 x 40 cm motif m² 56,800
15 Tegel keramik 40 x 40 cm polos m² 52,350
40 Tegel PC abu-abu 20 x 20 cm m² 39,350
41 Tegel plint PC warna 10 x 20 cm m' 15,850
42 Tegel plint ubin 15 x 20 cm m' 18,050
43 Tegel plint ubin teraso 10 x 30 cm m' 15,850
44 Tegel porselen 11 x 11 cm m² 48,800
45 Tegel teraso 20 x 20 cm m² 57,300
46 Tegel teraso 30 x 30 cm m² 49,000
47 Ubin warna 20 x 20 cm m² 46,700
16 Keramik Plint Artistic m 145,100
17 Keramik Dinding 25 x 40 m² 94,875
18 Granite Tile 60 x 60 dos 239,050
19 Granite Tile 30 x 60 dos 262,350
20 Granite Tile 30 x 30 dos 139,850
21 Granite Artistik 10 x 20 dos 139,850
20 Lis Lantai mtr 20,125
55 Tegel Keramik 25 x 40 cm M2 63,000
56 Tegel Keramik 60 x 60 cm M2 204,750
21 Grass Block 54 x 36x 6 M2 147,800
58 Granit Tile Uk.60x60 (White Onyx) Indogress M2 420,000
Uk.60x60(Neptune Black)
59 Granit Tile M2 446,250
Decogres Black)
Uk.60x60(Neptune
22 Granit Tile M2 670,450
Decogres
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
23 Stepnosing m' 45,000
24 Paving 21.0 x 10.5 x 6.0 mutu K 200 m2 49,600
25 Paving 21.0 x 10.5 x 6.0 mutu K 225 m2 51,600
26 Paving 21.0 x 10.5 x 6.0 mutu K 250 m2 53,700
27 Paving 21.0 x 10.5 x 6.0 mutu K 275 m2 57,200
28 Paving 21.0 x 10.5 x 6.0 mutu K 300 m2 60,000
29 Paving 21.0 x 10.5 x 6.0 mutu K 175 warna m2 69,750
30 Paving 21.0 x 10.5 x 6.0 mutu K 200 warna m2 73,200
69 Paving 21.0 x 10.5 x 8.0 mutu K 400 m2 -
70 Paving 21.0 x 10.5 x 8.0 mutu K 500 m2 -
31 Uskup Tbl 6.0 mutu K 200 bh 4,000
32 Uskup Tbl 6.0 mutu K 225 bh 4,150
33 Uskup Tbl 6.0 mutu K 250 bh 4,300
34 Uskup Tbl 6.0 mutu K 275 bh 4,500
35 Uskup Tbl 6.0 mutu K 300 bh 4,600
36 Kanstin 40 x 30 x 10 K 250 bh 21,200
37 Kanstin 40 x 30 x 10 K 275 bh 22,700
38 Kanstin 40 x 30 x 10 K 300 bh 24,200
39 Kanstin 40 x 20 x 10 K 250 bh 18,500
40 Kanstin 40 x 20 x 10 K 275 bh 19,600
41 Kanstin 40 x 20 x 10 K 300 bh 20,700
42 Granite Tile 60 x 60 Ex. Granito dos 322,000
43 Kuku Macan m' 8,000
M BAHAN SANITAIR
1 Afour Buah 38,600
2 Bak air (tandon) Fibre kapasitas 550 m3 Buah 645,500
3 Bak cuci piring logam 100 Buah 275,000
4 Bak cuci piring logam 80 Buah 225,000
5 Bak teraso Buah 158,550
5 Floor drain Buah 11,500
7 Gorong-gorong beton diameter 40 cm m' 85,450
8 Gorong-gorong beton diameter 50 cm m' 106,750
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
6 Gorong-gorong beton diameter 100 cm m' 200,000
10 Klosed duduk porselint Komp. (AS) Buah 805,950
7 Klosed duduk putih porselen komplit Buah 1,147,400
8 Klosed jongkok keramik (Ina) muda Buah 178,250
9 Klosed jongkok keramik (Ina) tua Buah 180,000
14 Klosed jongkok porselen warna putih Buah 116,550
15 Klosed jongkok teraso lokal Buah 74,850
10 Kran biasa Buah 21,500
11 Pipa / slang spiral saluran kran Set 71,600
12 Seal Tape Buah 2,700
13 Urinoir Buah 1,725,000
14 Wastafel keramik (Ina) muda Buah 502,000
15 Wastafel keramik (Ina) tua Buah 425,000
16 Kran Sedang Buah 65,000
17 Double Kran Buah 291,450
24 Kran Sensor buah 1,575,000
25 Hand driyer buah 984,350
18 Klosed Duduk Standart TOTO unit 2,415,000
19 Klosed Duduk Non Standart TOTO unit 8,970,000
20 Shower kloset biasa bh 85,000
N BAHAN PAKU
1 Paku asbes Buah 500
2 Paku beton besar Biji 900
3 Paku beton kecil Kg 23,700
4 Paku dur 5" Kg 18,650
5 Paku eternite Kg 25,900
6 Paku Jembatan Kg 13,000
7 Paku keling 3/4", 5/8", 7/8" Kg 21,200
8 Paku pancing Kg 22,350
6 Paku payung Kg 25,050
7 Paku reng 2" Kg 12,900
8 Paku seng Kg 23,100
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
9 Paku skrup Dos 14,000
10 Paku skrup 0,5" Dos 8,500
11 Paku skrup 1" Biji 1,050
12 Paku triplek Dos 33,600
13 Paku usuk 4" Kg 14,000
O BAHAN KAYU
1 Acuan Kayu Begisting m³ 3,090,150
2 Kayu balau (balok) m³ 8,162,450
3 Kayu balau (usuk) m³ 7,888,500
4 Kayu bengkirai (reng) m³ 7,854,600
2 Kayu bengkirai (balok) m³ 12,362,500
3 Kayu bengkirai (papan) m³ 13,225,000
4 Kayu bengkirai (usuk) m³ 11,500,000
5 Kayu jati balok 8/12, 6/12,8/15 m³ 23,000,000
6 Kayu jati papan 2/20 x 2 m m³ 24,150,000
7 Kayu jati reng 2/3, 3/5 m³ 16,985,000
7 Kayu jati usuk 5/7, 4/6, 3/5 m³ 18,400,000
8 Kayu kamper (balok) 6/12 m³ 9,717,500
9 Kayu kamper (balok) 8/12 m³ 8,978,750
10 Kayu kamper (balok) 8/15 m³ 8,978,750
11 Kayu kamper (usuk) 3/5 m³ 5,130,700
12 Kayu kamper (usuk) 4/6 m³ 5,772,050
9 Kayu kamper (usuk) 5/7 m³ 5,772,050
10 Kayu kamper (reng) 2/3, 3/5 m³ 5,130,700
11 Kayu kamper (papan) 2/20 x 4 m m³ 9,299,500
12 Kayu kamper (papan) 3/30 x 4 m m³ 9,620,100
13 Kayu kruing (balok) 6/12 m³ 6,413,400
14 Kayu kruing (balok) 8/12 m³ 6,413,400
15 Kayu kruing (balok) 8/15 m³ 6,413,400
16 Kayu kruing (usuk) 3/5 m³ 4,489,350
17 Kayu kruing (usuk) 4/6 m³ 4,810,050
14 Kayu kruing (usuk) 5/7 m³ 4,810,050
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
15 Kayu kruing (reng) 2/3, 3/5 m³ 4,489,350
16 Kayu kruing (papan) 2/20 x 4 m m³ 6,734,050
17 Kayu kruing (papan) 3/30 x 4 m m³ 7,054,800
18 Kayu lokal usuk 4/6 m³ 2,308,800
15 Kayu lokal usuk 5/7 m³ 2,308,800
16 Kayu lokal reng 2/3, 3/5 x 2 m m³ 1,924,000
17 Kayu lokal papan 2/20 x 4 m m³ 3,848,100
Kayu lokal papan 3/20 x 4 m m³ 3,848,100
15 Kayu meranti balok 6/12 m³ 5,451,350
16 Kayu meranti balok 8/12 m³ 5,451,350
17 Kayu meranti balok 8/15 m³ 5,451,350
18 Kayu meranti usuk 3/5 m³ 3,848,100
19 Kayu meranti usuk 4/6 m³ 4,168,700
16 Kayu meranti usuk 5/7 m³ 4,168,700
17 Kayu meranti reng 2/3, 3/5 m³ 3,848,100
18 Kayu meranti papan 2/20 x 4 m m³ 5,772,050
19 Kayu meranti papan 3/30 x 4 m m³ 6,092,800
20 List kayu 2/4 kamper m³ 6,023,850
21 List kayu propil m³ 12,900
22 kayu Mindi ( balok)6/12 m³ 8,925,000
23 Kayu Mindi ( balok ) 8/12 m³ 8,925,000
24 kayu Mindi papan 2/20 x 4 m m³ 9,344,450
25 kayu Mindi papan 3/30 x 4 m m³ 9,652,800
20 Kayu Ulin (Balok) m³ 17,000,000
21 Kayu Ulin (Papan) m³ 17,500,000
P BAHAN KACA
1 Kaca es tebal 3 mm m² 80,500
1 Kaca es tebal 5 mm m² 102,000
2 Kaca naco Lembar 7,550
4 Kaca polos tebal 3 mm m² 66,000
3 Kaca polos tebal 5 mm m² 90,000
4 Kaca rayban tebal 5 mm m² 102,500
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
7 Kaca Flat Tempered 5mm 5 mm M² 223,000
8 Kaca Flat Tempered 6mm 6 mm M² 390,000
9 Kaca Flat Tempered 8mm 8 mm M² 390,000
5 Kaca Flat Tempered 10mm 10 mm M² 950,000
6 Kaca Flat Tempered 12mm 12 mm M² 1,425,000
7 Kaca Flat Tempered 15mm 15 mm M² 3,500,000
13 Kaca Curved Tempered 5mm 5 mm M² 332,000
14 Kaca Curved Tempered 6mm 6 mm M² 372,000
15 Kaca Curved Tempered 8mm 8 mm M² 497,500
8 Kaca Curved Tempered 10mm 10 mm M² 637,000
9 Kaca Curved Tempered 12mm 12 mm M² 1,550,000
10 Kaca Curved Tempered 15mm 15 mm M² 3,500,000
Q BAHAN PIPA
PIPA AIR BERSIH
1. Pipa PVC RRJ 6 m' S - 10 " maspion " 2" Batang 162,000
Pipa PVC RRJ 6 m' S - 10 " maspion " 2 1/2" Batang 228,450
Pipa PVC RRJ 6 m' S - 10 " maspion " 3" Batang 320,000
Pipa PVC RRJ 6 m' S - 10 " maspion " 4" Batang 478,250
Pipa PVC RRJ 6 m' S - 10 " maspion " 6" Batang 995,800
Pipa PVC RRJ 6 m' S - 10 " maspion " 8" Batang 1,621,400
Pipa PVC RRJ 6 m' S - 10 " maspion " 10" Batang 2,514,100
Pipa PVC RRJ 6 m' S - 10 " maspion " 12" Batang 3,984,100
Pipa PVC RRJ 6 m' S - 10 " maspion " 14" Batang 5,136,800
Pipa PVC RRJ 6 m' S - 10 " maspion " 16" Batang 6,523,850
2 Pipa PVC moof 6 m' S - 10 " maspion " 1" Batang 39,750
Pipa PVC moof 6 m' S - 10 " maspion " 1 1/4" Batang 59,000
Pipa PVC moof 6 m' S - 10 " maspion " 1 1/2" Batang 95,650
Pipa PVC moof 6 m' S - 10 " maspion " 2" Batang 156,750
Pipa PVC moof 6 m' S - 10 " maspion " 2 1/2" Batang 222,150
Pipa PVC moof 6 m' S - 10 " maspion " 3" Batang 320,450
Pipa PVC moof 6 m' S - 10 " maspion " 4" Batang 482,450
Pipa PVC moof 6 m' S - 10 " maspion " 6" Batang 1,020,800
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
Pipa PVC moof 6 m' S - 10 " maspion " 8" Batang 1,665,050
Pipa PVC moof 6 m' S - 10 " maspion " 10" Batang 2,992,250
Pipa PVC moof 6 m' S - 10 " maspion " 12" Batang 4,764,900
3. Pipa PVC RRJ 6 m' S - 12,5 " maspion " 2" Batang 133,650
Pipa PVC RRJ 6 m' S - 12,5 " maspion " 2 1/2" Batang 189,300
Pipa PVC RRJ 6 m' S - 12,5 " maspion " 3" Batang 265,400
Pipa PVC RRJ 6 m' S - 12,5 " maspion " 4" Batang 389,200
Pipa PVC RRJ 6 m' S - 12,5 " maspion " 6" Batang 816,650
Pipa PVC RRJ 6 m' S - 12,5 " maspion " 8" Batang 1,321,000
Pipa PVC RRJ 6 m' S - 12,5 " maspion " 10" Batang 2,059,350
Pipa PVC RRJ 6 m' S - 12,5 " maspion " 12" Batang 3,259,700
Pipa PVC RRJ 6 m' S - 12,5 " maspion " 14" Batang 4,227,900
Pipa PVC RRJ 6 m' S - 12,5 " maspion " 16" Batang 5,339,950
4. Pipa PVC moof 6 m' S - 12,5 " maspion " 1/2" Batang 24,550
Pipa PVC moof 6 m' S - 12,5 " maspion " 3/4" Batang 38,850
Pipa PVC moof 6 m' S - 12,5 " maspion " 1" Batang 44,100
Pipa PVC moof 6 m' S - 12,5 " maspion " 1 1/2" Batang 88,300
Pipa PVC moof 6 m' S - 12,5 " maspion " 2" Batang 119,450
Pipa PVC moof 6 m' S - 12,5 " maspion " 2 1/2" Batang 171,450
Pipa PVC moof 6 m' S - 12,5 " maspion " 3" Batang 248,300
Pipa PVC moof 6 m' S - 12,5 " maspion " 4" Batang 366,950
Pipa PVC moof 6 m' S - 12,5 " maspion " 6" Batang 785,150
Pipa PVC moof 6 m' S - 12,5 " maspion " 8" Batang 1,272,700
Pipa PVC moof 6 m' S - 12,5 " maspion " 10" Batang 1,994,750
Pipa PVC moof 6 m' S - 12,5 " maspion " 12" Batang 3,176,550
5 Pipa PVC RRJ 6 m' S - 10 " Langgeng " 2" Batang 159,150
Pipa PVC RRJ 6 m' S - 10 " Langgeng " 2 1/2" Batang 223,300
Pipa PVC RRJ 6 m' S - 10 " Langgeng " 3" Batang 315,200
Pipa PVC RRJ 6 m' S - 10 " Langgeng " 4" Batang 465,950
Pipa PVC RRJ 6 m' S - 10 " Langgeng " 6" Batang 968,500
Pipa PVC RRJ 6 m' S - 10 " Langgeng " 8" Batang 1,613,700
Pipa PVC RRJ 6 m' S - 10 " Langgeng " 10" Batang 2,501,100
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
Pipa PVC RRJ 6 m' S - 10 " Langgeng " 11" Batang 3,165,300
Pipa PVC RRJ 6 m' S - 10 " Langgeng " 12" Batang 3,959,550
Pipa PVC RRJ 6 m' S - 10 " Langgeng " 14" Batang 5,670,100
Pipa PVC RRJ 6 m' S - 10 " Langgeng " 16" Batang 7,195,500
6. Pipa PVC moof 6 m' S - 10 " Langgeng " 3/4" Batang 23,100
Pipa PVC moof 6 m' S - 10 " Langgeng " 1" Batang 39,650
Pipa PVC moof 6 m' S - 10 " Langgeng " 1 1/4" Batang 59,000
Pipa PVC moof 6 m' S - 10 " Langgeng " 1 1/2" Batang 93,000
Pipa PVC moof 6 m' S - 10 " Langgeng " 2" Batang 142,800
Pipa PVC moof 6 m' S - 10 " Langgeng " 2 1/2" Batang 202,950
Pipa PVC moof 6 m' S - 10 " Langgeng " 3" Batang 292,300
Pipa PVC moof 6 m' S - 10 " Langgeng " 4" Batang 440,350
Pipa PVC moof 6 m' S - 10 " Langgeng " 6" Batang 932,150
Pipa PVC moof 6 m' S - 10 " Langgeng " 8" Batang 1,556,600
Pipa PVC moof 6 m' S - 10 " Langgeng " 10" Batang 2,424,850
Pipa PVC moof 6 m' S - 10 " Langgeng " 11" Batang 3,067,650
Pipa PVC moof 6 m' S - 10 " Langgeng " 12" Batang 3,861,750
7 Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 2" Batang 131,750
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 2 1/2" Batang 185,950
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 3" Batang 262,350
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 4" Batang 380,300
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 6" Batang 796,000
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 8" Batang 1,316,550
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 10" Batang 2,051,800
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 11" Batang 2,572,500
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 12" Batang 3,243,450
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 14" Batang 4,204,500
Pipa PVC RRJ 6 m' S - 12,5 " Langgeng " 16" Batang 5,894,800
8 Pipa PVC moof 6 m' S - 12,5 " Langgeng " 1/2" Batang 14,250
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 3/4" Batang 21,500
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 1" Batang 34,100
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 1 1/4" Batang 52,350
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 1 1/2" Batang 80,200
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 2" Batang 115,700
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 2 1/2" Batang 537,600
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 3" Batang 240,200
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 4" Batang 355,500
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 6" Batang 760,700
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 8" Batang 1,261,650
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 10" Batang 1,978,200
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 11" Batang 2,478,300
Pipa PVC moof 6 m' S - 12,5 " Langgeng " 12" Batang 3,148,600
9. Pipa PVC RRJ 6 m' S - 10 " Supralon " 2" Batang 141,400
Pipa PVC RRJ 6 m' S - 10 " Supralon " 2 1/2" Batang 198,450
Pipa PVC RRJ 6 m' S - 10 " Supralon " 3" Batang 277,700
Pipa PVC RRJ 6 m' S - 10 " Supralon " 4" Batang 416,000
Pipa PVC RRJ 6 m' S - 10 " Supralon " 6" Batang 862,950
Pipa PVC RRJ 6 m' S - 10 " Supralon " 8" Batang 1,404,050
Pipa PVC RRJ 6 m' S - 10 " Supralon " 10" Batang 2,176,400
Pipa PVC RRJ 6 m' S - 10 " Supralon " 12" Batang 3,446,600
Pipa PVC RRJ 6 m' S - 10 " Supralon " 14" Batang 4,436,550
Pipa PVC RRJ 6 m' S - 10 " Supralon " 16" Batang 5,639,300
10. Pipa PVC moof 6 m' S - 10 " Supralon " 1/2" Batang 13,850
Pipa PVC moof 6 m' S - 10 " Supralon " 3/4" Batang 20,550
Pipa PVC moof 6 m' S - 10 " Supralon " 1" Batang 35,350
Pipa PVC moof 6 m' S - 10 " Supralon " 1 1/4" Batang 52,700
Pipa PVC moof 6 m' S - 10 " Supralon " 1 1/2" Batang 82,950
Pipa PVC moof 6 m' S - 10 " Supralon " 2" Batang 127,850
Pipa PVC moof 6 m' S - 10 " Supralon " 2 1/2" Batang 181,200
Pipa PVC moof 6 m' S - 10 " Supralon " 3" Batang 260,900
Pipa PVC moof 6 m' S - 10 " Supralon " 4" Batang 393,000
Pipa PVC moof 6 m' S - 10 " Supralon " 6" Batang 831,800
Pipa PVC moof 6 m' S - 10 " Supralon " 8" Batang 1,356,350
Pipa PVC moof 6 m' S - 10 " Supralon " 10" Batang 2,112,600
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
Pipa PVC moof 6 m' S - 10 " Supralon " 12" Batang 3,364,800
11. Pipa PVC RRJ 6 m' S - 12,5 " Supralon " 2" Batang 122,600
Pipa PVC RRJ 6 m' S - 12,5 " Supralon " 2 1/2" Batang 173,450
Pipa PVC RRJ 6 m' S - 12,5 " Supralon " 3" Batang 242,400
Pipa PVC RRJ 6 m' S - 12,5 " Supralon " 4" Batang 355,300
Pipa PVC RRJ 6 m' S - 12,5 " Supralon " 6" Batang 744,000
Pipa PVC RRJ 6 m' S - 12,5 " Supralon " 8" Batang 1,202,350
Pipa PVC RRJ 6 m' S - 12,5 " Supralon " 10" Batang 1,874,100
Pipa PVC RRJ 6 m' S - 12,5 " Supralon " 12" Batang 2,963,300
Pipa PVC RRJ 6 m' S - 12,5 " Supralon " 14" Batang 3,842,050
Pipa PVC RRJ 6 m' S - 12,5 " Supralon " 16" Batang 4,849,400
12. Pipa PVC moof 6 m' S - 12,5 " Supralon " 1/2" Batang 13,500
Pipa PVC moof 6 m' S - 12,5 " Supralon " 3/4" Batang 20,250
Pipa PVC moof 6 m' S - 12,5 " Supralon " 1" Batang 31,900
Pipa PVC moof 6 m' S - 12,5 " Supralon " 1 1/4" Batang 49,200
Pipa PVC moof 6 m' S - 12,5 " Supralon " 1 1/2" Batang 75,150
Pipa PVC moof 6 m' S - 12,5 " Supralon " 2" Batang 108,350
Pipa PVC moof 6 m' S - 12,5 " Supralon " 2 1/2" Batang 155,500
Pipa PVC moof 6 m' S - 12,5 " Supralon " 3" Batang 225,100
Pipa PVC moof 6 m' S - 12,5 " Supralon " 4" Batang 333,050
Pipa PVC moof 6 m' S - 12,5 " Supralon " 6" Batang 712,600
Pipa PVC moof 6 m' S - 12,5 " Supralon " 8" Batang 1,154,150
Pipa PVC moof 6 m' S - 12,5 " Supralon " 10" Batang 1,809,450
Pipa PVC moof 6 m' S - 12,5 " Supralon " 12" Batang 2,880,350
1 Pipa Air Gl Ø 1/2" 1,5 mm Batang 131,250
Pipa Air Gl Ø 1/2" 1,8 mm 1,8 mm Batang 148,750
Pipa Air Gl Ø 1/2" 2,0 mm 2,0 mm Batang 166,300
Pipa Air Gl Ø 1/2" 2,2 mm 2,2 mm Batang 192,450
2 Pipa Air Gl Ø 3/4" 1,5 mm Batang 157,350
Pipa Air Gl Ø 3/4" 1,8 mm 1,8 mm Batang 192,450
Pipa Air Gl Ø 3/4" 2,0 mm 2,0 mm Batang 209,850
Pipa Air Gl Ø 3/4" 2,2 mm 2,2 mm Batang 244,850
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
3 Pipa Air Gl Ø 1" 1,8 mm Batang 236,250
Pipa Air Gl Ø 1" 2,0 mm 2,0 mm Batang 262,350
Pipa Air Gl Ø 1" 2,3 mm 2,3 mm Batang 297,350
Pipa Air Gl Ø 1" 2,5 mm 2,5 mm Batang 323,700
Pipa Air Gl Ø 1" 2,8 mm 2,8 mm Batang 367,250
4 Pipa Air Gl Ø 1 1/4" 1,8 mm Batang 330,600
Pipa Air Gl Ø 1 1/4" 2,3 mm 2,3 mm Batang 367,250
Pipa Air Gl Ø 1 1/4" 2,8 mm 2,8 mm Batang 528,150
5 Pipa Air Gl Ø 1 1/2" 1,8 mm Batang 349,850
Pipa Air Gl Ø 1 1/2" 2,0 mm 2,0 mm Batang 384,800
Pipa Air Gl Ø 1 1/2" 2,3 mm 2,3 mm Batang 446,000
Pipa Air Gl Ø 1 1/2" 2,5 mm 2,5 mm Batang 481,100
Pipa Air Gl Ø 1 1/2" 2,8 mm 2,8 mm Batang 542,200
6 Pipa Air Gl Ø 2" 1,8 mm Batang 437,200
Pipa Air Gl Ø 2" 2,0 mm 2,0 mm Batang 489,700
Pipa Air Gl Ø 2" 2,3 mm 2,3 mm Batang 551,000
Pipa Air Gl Ø 2" 2,5 mm 2,5 mm Batang 603,500
Pipa Air Gl Ø 2" 2,8 mm 2,8 mm Batang 673,450
7 Pipa Air Gl Ø 2 1/2" 2,3 mm Batang 708,400
Pipa Air Gl Ø 2 1/2" 2,5 mm 2,5 mm Batang 769,500
Pipa Air Gl Ø 2 1/2" 2,8 mm 2,8 mm Batang 857,000
Pipa Air Gl Ø 2 1/2" 3,0 mm 3,0 mm Batang 883,250
8 Pipa Air Gl Ø 3" 2,0 mm Batang 717,150
Pipa Air Gl Ø 3" 2,3 mm 2,3 mm Batang 813,300
Pipa Air Gl Ø 3" 2,5 mm 2,5 mm Batang 874,500
Pipa Air Gl Ø 3" 2,8 mm 2,8 mm Batang 979,500
Pipa Air Gl Ø 3" 3,0 mm 3,0 mm Batang 1,049,450
9 Pipa Air Gl Ø 4" 2,3 mm Batang 1,049,450
2,5 mm Batang 1,145,650
2,8 mm Batang 1,285,600
3,0 mm Batang 1,373,050
3,3 mm Batang 1,512,900
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
10 Pipa Air Gl Ø 6" 2,5 mm Batang 1,670,550
2,8 mm Batang 1,871,500
3,0 mm Batang 2,002,750
3,3 mm Batang 2,203,800
3,5 mm Batang 2,335,050
11 Pipa Air Gl Ø 8" medium Batang 4,897,500
12 Pipa Air Gl Ø 9" medium Batang 6,646,600
13 Pipa Air Gl Ø 10" medium Batang 8,955,450
14 Pipa Air Gl Ø 12" medium Batang 10,039,950
PIPA SANITASI
1 Pipa PVC 1 1/2" AW Maspion m' 21,200
2 Pipa PVC 1 1/4" AW Maspion m' 16,350
3 Pipa PVC 1" AW Maspion m' 11,400
4 Pipa PVC 1/2" AW Maspion m' 7,450
5 Pipa PVC 2 1/2 " AW Maspion m' 40,400
6 Pipa PVC 2" AW Maspion m' 31,150
7 Pipa PVC 3" AW Maspion m' 57,300
8 Pipa PVC 3/4" AW Maspion m' 9,100
9 Pipa PVC 4" AW Maspion m' 84,200
10 Pipa PVC 5" AW Maspion m' 132,600
11 Pipa PVC 6" AW Maspion m' 175,000
12 Pipa PVC 8" AW Maspion m' 257,000
13 Pipa PVC 10" AW Maspion m' 356,500
38 Sock Drat Luar Maspion Buah 122,850
39 Sok PVC 1 1/2" AW Maspion Buah 3,550
40 Sok PVC 1 1/4" AW Maspion Buah 3,350
41 Sok PVC 1" AW Maspion Buah 2,900
42 Sok PVC 2 1/2 " AW Maspion Buah 6,900
43 Sok PVC 2" AW Maspion Buah 4,700
44 Sok PVC 3" AW Maspion Buah 11,750
45 Sok PVC 3/4" AW Maspion Buah 2,200
46 Sok PVC 4" AW Maspion Buah 23,300
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
47 Sok PVC 1/2" AW Maspion Buah 1,150
14 Stop Kran Ø 1 1/2 " Maspion Buah 21,900
15 Stop Kran Ø 2 " Maspion Buah 204,750
16 Stop Kran Ø 3 " Maspion Buah 217,750
51 T PVC 1 1/2" AW Maspion Buah 5,450
52 T PVC 1 1/4" AW Maspion Buah 3,950
53 T PVC 1" AW Maspion Buah 3,550
54 T PVC 2 1/2 " AW Maspion Buah 15,300
55 T PVC 2" AW Maspion Buah 10,900
56 T PVC 3" AW Maspion Buah 26,250
57 T PVC 3/4" AW Maspion Buah 2,900
58 T PVC 4" AW Maspion Buah 48,800
59 T PVC 5" AW Maspion Buah 120,600
60 T PVC 6" AW Maspion Buah 205,550
61 T PVC 8" AW Maspion Buah 438,250
62 T PVC 1/2" AW Maspion Buah 1,550
14 Stop kran 1" Buah 35,550
15 Kran air 3/4" Buah 22,050
16 Selang 5/8" m' 5,850
17 Springkle Buah 100,550
ASSESORIS PIPA
1 Baut mur 5/8 x 2" 5/8 x 2" Buah 3,850
2 Baut mur 5/8 x 2 1/2" 5/8 x 2 1/2" Buah 4,200
3 Baut mur 5/8 x 3" 5/8 x 3" Buah 4,600
4 Baut mur 5/8 x 4" 5/8 x 4" Buah 5,100
5 Baut mur 3/4 x 2 1/2" 3/4 x 2 1/2" Buah 8,050
6 Baut mur 3/4 x 3" 3/4 x 3" Buah 10,350
7 Bend All Flange 11,25° 2" 2" Buah 185,400
8 Bend All Flange 11,25° 3" 3" Buah 198,450
9 Bend All Flange 11,25° 4" 4" Buah 266,700
10 Bend All Flange 11,25° 6" 6" Buah 458,000
11 Bend All Flange 11,25° 8" 8" Buah 571,500
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
12 Bend All Flange 11,25° 10" 10" Buah 1,063,950
13 Bend All Flange 11,25° 12" 12" Buah 1,331,800
14 Bend All Flange 11,25° 14" 14" Buah 1,603,850
15 Bend All Flange 11,25° 16" 16" Buah 1,963,150
16 Bend All Flange 22,5° 2" 2" Buah 183,750
17 Bend All Flange 22,5° 3" 3" Buah 198,450
18 Bend All Flange 22,5° 4" 4" Buah 289,050
19 Bend All Flange 22,5° 6" 6" Buah 471,100
20 Bend All Flange 22,5° 8" 8" Buah 637,650
21 Bend All Flange 22,5° 10" 10" Buah 899,100
22 Bend All Flange 22,5° 12" 12" Buah 1,165,350
23 Bend All Flange 22,5° 14" 14" Buah 1,724,300
24 Bend All Flange 22,5° 16" 16" Buah 2,368,550
25 Bend All Flange 45° 2" 2" Buah 185,700
26 Bend All Flange 45° 3" 3" Buah 246,400
27 Bend All Flange 45° 4" 4" Buah 318,350
28 Bend All Flange 45° 6" 6" Buah 530,550
29 Bend All Flange 45° 8" 8" Buah 795,750
30 Bend All Flange 45° 10" 10" Buah 928,500
31 Bend All Flange 45° 12" 12" Buah 1,193,700
32 Bend All Flange 45° 14" 14" Buah 1,752,650
33 Bend All Flange 45° 16" 16" Buah 2,747,600
34 Bend All Flange 90° 2" 2" Buah 198,950
35 Bend All Flange 90° 3" 3" Buah 312,550
36 Bend All Flange 90° 4" 4" Buah 369,450
37 Bend All Flange 90° 6" 6" Buah 710,500
38 Bend All Flange 90° 8" 8" Buah 843,250
39 Bend All Flange 90° 10" 10" Buah 1,184,250
40 Bend All Flange 90° 12" 12" Buah 2,084,450
41 Bend All Flange 90° 14" 14" Buah 2,321,200
42 Bend All Flange 90° 16" 16" Buah 2,558,000
43 Bend Socket Spigot 11,25° 2" 2" Buah 51,850
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
44 Bend Socket Spigot 11,25° 2 1/2" 2 1/2" Buah 66,450
45 Bend Socket Spigot 11,25° 3" 3" Buah 82,400
46 Bend Socket Spigot 11,25° 4" 4" Buah 119,350
47 Bend Socket Spigot 11,25° 6" 6" Buah 230,850
48 Bend Socket Spigot 11,25° 8" 8" Buah 395,100
49 Bend Socket Spigot 11,25° 10" 10" Buah 704,200
50 Bend Socket Spigot 11,25° 12" 12" Buah 1,174,100
51 Bend Socket Spigot 11,25° 14" 14" Buah 3,286,800
52 Bend Socket Spigot 11,25° 16" 16" Buah 6,193,400
53 Bend Socket Spigot 22,5° 2" 2" Buah 54,350
54 Bend Socket Spigot 22,5° 2 1/2" 2 1/2" Buah 72,000
55 Bend Socket Spigot 22,5° 3" 3" Buah 89,000
56 Bend Socket Spigot 22,5° 4" 4" Buah 128,600
57 Bend Socket Spigot 22,5° 6" 6" Buah 259,850
58 Bend Socket Spigot 22,5° 8" 8" Buah 452,400
59 Bend Socket Spigot 22,5° 10" 10" Buah 834,400
60 Bend Socket Spigot 22,5° 12" 12" Buah 1,395,650
61 Bend Socket Spigot 22,5° 14" 14" Buah 3,286,800
62 Bend Socket Spigot 22,5° 16" 16" Buah 6,193,400
63 Bend Socket Spigot 45° 2" 2" Buah 62,150
64 Bend Socket Spigot 45° 2 1/2" 2 1/2" Buah 76,650
65 Bend Socket Spigot 45° 3" 3" Buah 101,000
66 Bend Socket Spigot 45° 4" 4" Buah 143,300
67 Bend Socket Spigot 45° 6" 6" Buah 305,100
68 Bend Socket Spigot 45° 8" 8" Buah 541,350
69 Bend Socket Spigot 45° 10" 10" Buah 1,014,800
70 Bend Socket Spigot 45° 12" 12" Buah 1,722,900
71 Bend Socket Spigot 45° 14" 14" Buah 3,667,000
72 Bend Socket Spigot 45° 16" 16" Buah 6,916,750
73 Bend Socket Spigot 90° 2" 2" Buah 67,700
74 Bend Socket Spigot 90° 2 1/2" 2 1/2" Buah 86,500
75 Bend Socket Spigot 90° 3" 3" Buah 114,200
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
76 Bend Socket Spigot 90° 4" 4" Buah 164,400
77 Bend Socket Spigot 90° 6" 6" Buah 350,150
78 Bend Socket Spigot 90° 8" 8" Buah 631,450
79 Bend Socket Spigot 90° 10" 10" Buah 1,107,400
80 Bend Socket Spigot 90° 12" 12" Buah 1,919,150
81 Bend Socket Spigot 90° 14" 14" Buah 5,960,100
82 Bend Socket Spigot 90° 16" 16" Buah 8,915,750
83 Box meter 0 Buah 35,050
84 Butterfly Valve 2" 2" Buah 349,850
85 Butterfly Valve 3" 3" Buah 612,150
86 Butterfly Valve 4" 4" Buah 699,600
87 Butterfly Valve 6" 6" Buah 1,399,200
88 Butterfly Valve 8" 8" Buah 2,186,300
89 Butterfly Valve 10" 10" Buah 3,060,850
90 Butterfly Valve 12" 12" Buah 4,810,050
91 Check Valve 2" 2" Buah 1,224,400
92 Check Valve 3" 3" Buah 1,924,000
93 Check Valve 4" 4" Buah 2,886,000
94 Check Valve 6" 6" Buah 4,810,050
95 Check Valve 8" 8" Buah 7,871,000
96 Check Valve 10" 10" Buah 9,007,800
97 Check Valve 12" 12" Buah 11,194,350
98 Check Valve 14" 14" Buah 28,860,300
99 Check Valve 16" 16" Buah 37,168,600
100 Clamp Sadle 1 1/2" x 1/2" 1 1/2" x 1/2" Buah 19,950
101 Clamp Sadle 1 1/2" x 3/4" 1 1/2" x 3/4" Buah 22,750
102 Clamp Sadle 2" x 1/2" 2" x 1/2" Buah 25,500
103 Clamp Sadle 3" x 1/2" 3" x 1/2" Buah 43,150
104 Clamp Sadle 4" x 1/2" 4" x 1/2" Buah 46,200
105 Clamp Sadle 6" x 1/2" 6" x 1/2" Buah 107,800
106 Clamp Sadle 2" x 3/4" 2" x 3/4" Buah 28,000
107 Clamp Sadle 3" x 3/4" 3" x 3/4" Buah 43,550
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
108 Clamp Sadle 4" x 3/4" 4" x 3/4" Buah 66,350
109 Clamp Sadle 6" x 3/4" 6" x 3/4" Buah 113,700
110 Clamp Sadle 8" x 3/4" 8" x 3/4" Buah 180,050
111 Clamp Sadle 10" x 3/4" 10" x 3/4" Buah 255,750
112 Clamp Sadle 2" x 1" 2" x 1" Buah 29,400
113 Clamp Sadle 3" x 1" 3" x 1" Buah 44,700
114 Clamp Sadle 4" x 1" 4" x 1" Buah 72,850
115 Clamp Sadle 6" x 1" 6" x 1" Buah 115,500
116 Dop Gl 1/2" 1/2" Buah 3,850
117 Dop Gl 3/4" 3/4" Buah 4,600
118 Dop Gl 1" 1" Buah 6,400
119 Dop Gl 1 1/4" 1 1/4" Buah 9,550
120 Dop Gl 1 1/2" 1 1/2" Buah 12,450
121 Dop Gl 2" 2" Buah 17,400
122 Dop Gl 2 1/2" 2 1/2" Buah 35,250
123 Dop Gl 3" 3" Buah 48,800
124 Dop Gl 4" 4" Buah 81,450
125 Dop Gl 6" 6" Buah 271,600
126 Dop PVC moof 1" 1" Buah 5,100
127 Dop PVC moof 2" 2" Buah 12,350
128 Dop PVC moof 2 1/2" 2 1/2" Buah 17,100
129 Dop PVC moof 3" 3" Buah 23,400
130 Dop PVC moof 4" 4" Buah 39,250
131 Dop PVC moof 6" 6" Buah 87,450
132 Dop PVC RRJ 2" 2" Buah 12,350
133 Dop PVC RRJ 2 1/2" 2 1/2" Buah 17,100
134 Dop PVC RRJ 3" 3" Buah 23,400
135 Dop PVC RRJ 4" 4" Buah 39,250
136 Dop PVC RRJ 6" 6" Buah 87,450
137 Double Air Valve 2" 2" Buah 1,563,200
138 Double Air Valve 3" 3" Buah 1,610,550
139 Double Air Valve 4" 4" Buah 2,273,750
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
140 Double Air Valve 6" 6" Buah 3,979,150
141 Double Neple 1/2" 1/2" Buah 3,950
142 Double Neple 3/4" 3/4" Buah 5,450
143 Double Neple 1" 1" Buah 7,550
144 Double Neple 1 1/4" 1 1/4" Buah 11,000
145 Double Neple 1 1/2" 1 1/2" Buah 15,400
146 Double Neple 2" 2" Buah 21,200
147 Double Neple 2 1/2" 2 1/2" Buah 35,250
148 Double Neple 3" 3" Buah 59,700
149 Double Neple 4" 4" Buah 95,000
150 Double Neple 6" 6" Buah 353,100
151 Flange Buta 2" 2" Buah 57,300
152 Flange Buta 3" 3" Buah 100,050
153 Flange Buta 4" 4" Buah 119,900
154 Flange Buta 6" 6" Buah 192,750
155 Flange Buta 8" 8" Buah 263,650
156 Flange Buta 10" 10" Buah 312,550
157 Flange Buta 12" 12" Buah 844,050
158 Flange Buta 14" 14" Buah 958,750
159 Flange Buta 16" 16" Buah 1,438,150
160 Flange Las 2" 2" Buah 63,500
161 Flange Las 2 1/2" 2 1/2" Buah 66,350
162 Flange Las 3" 3" Buah 80,600
163 Flange Las 4" 4" Buah 99,400
164 Flange Las 6" 6" Buah 182,900
165 Flange Las 8" 8" Buah 244,400
166 Flange Las 10" 10" Buah 364,750
167 Flange Las 12" 12" Buah 386,600
168 Flange Las 14" 14" Buah 639,450
169 Flange Las 16" 16" Buah 754,100
170 Flange Socket PVC RR 2" 2" Buah 122,500
171 Flange Socket PVC RR 2 1/2" 2 1/2" Buah 137,000
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
172 Flange Socket PVC RR 3" 3" Buah 162,750
173 Flange Socket PVC RR 4" 4" Buah 218,050
174 Flange Socket PVC RR 6" 6" Buah 400,450
175 Flange Socket PVC RR 8" 8" Buah 706,950
176 Flange Socket PVC RR 10" 10" Buah 1,587,800
177 Flange Socket PVC RR 12" 12" Buah 3,062,000
178 Flange Socket PVC RR 14" 14" Buah 4,370,400
179 Flange Socket PVC RR 16" 16" Buah 6,309,100
180 Flange Spigot PVC 2" 2" Buah 101,500
181 Flange Spigot PVC 2 1/2" 2 1/2" Buah 115,500
182 Flange Spigot PVC 3" 3" Buah 13,650
183 Flange Spigot PVC 4" 4" Buah 172,700
184 Flange Spigot PVC 6" 6" Buah 341,650
185 Flange Spigot PVC 8" 8" Buah 600,050
186 Flange Spigot PVC 10" 10" Buah 1,393,000
187 Flange Spigot PVC 12" 12" Buah 2,870,150
188 Flange Spigot PVC 14" 14" Buah 4,097,400
189 Flange Spigot PVC 16" 16" Buah 6,000,950
190 Gate Valve 2" 2" Buah 903,000
191 Gate Valve 2 1/2" 2 1/2" Buah 1,033,050
192 Gate Valve 3" 3" Buah 1,353,450
193 Gate Valve 4" 4" Buah 1,934,900
194 Gate Valve 6" 6" Buah 3,826,200
195 Gate Valve 8" 8" Buah 6,449,800
196 Gate Valve 10" 10" Buah 9,292,150
197 Gate Valve 12" 12" Buah 10,385,300
198 Gate Valve 14" 14" Buah 21,317,300
199 Gate Valve 16" 16" Buah 29,270,300
200 Giboult Joint u/ PVC 2" 2" Buah 91,950
201 Giboult Joint u/ PVC 3" 3" Buah 135,450
202 Giboult Joint u/ PVC 4" 4" Buah 198,450
203 Giboult Joint u/ PVC 6" 6" Buah 312,550
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
204 Giboult Joint u/ PVC 8" 8" Buah 426,300
205 Giboult Joint u/ PVC 10" 10" Buah 615,800
206 Giboult Joint u/ PVC 12" 12" Buah 871,700
207 Giboult Joint u/ PVC 14" 14" Buah 1,061,100
208 Giboult Joint u/ PVC 16" 16" Buah 1,478,050
209 Giboult Joint u/ ACP 2" 2" Buah 106,150
210 Giboult Joint u/ ACP 3" 3" Buah 156,300
211 Giboult Joint u/ ACP 4" 4" Buah 229,100
212 Giboult Joint u/ ACP 6" 6" Buah 408,750
213 Giboult Joint u/ ACP 8" 8" Buah 557,400
214 Giboult Joint u/ ACP 10" 10" Buah 805,350
215 Giboult Joint u/ ACP 12" 12" Buah 1,139,850
216 Giboult Joint u/ ACP 14" 14" Buah 1,387,650
217 Giboult Joint u/ ACP 16" 16" Buah 1,932,800
218 Giboult Joint u/ DCI 2" 2" Buah 106,050
219 Giboult Joint u/ DCI 3" 3" Buah 156,300
220 Giboult Joint u/ DCI 4" 4" Buah 229,000
221 Giboult Joint u/ DCI 6" 6" Buah 360,750
222 Giboult Joint u/ DCI 8" 8" Buah 492,000
223 Giboult Joint u/ DCI 10" 10" Buah 710,500
224 Giboult Joint u/ DCI 12" 12" Buah 1,005,750
225 Giboult Joint u/ DCI 14" 14" Buah 1,224,400
226 Giboult Joint u/ DCI 16" 16" Buah 1,705,400
227 HU (Hidran Umum) 1 m³ 1 m³ Buah 1,515,950
228 HU (Hidran Umum) 2 m³ 2 m³ Buah 2,368,550
229 HU (Hidran Umum) 3 m³ 3 m³ Buah 3,126,550
230 HU (Hidran Umum) 4 m³ 4 m³ Buah 4,642,350
231 HU (Hidran Umum) 5 m³ 5 m³ Buah 7,958,450
232 Kenie Drat Gl 1/2" 1/2" Buah 4,600
233 Kenie Drat Gl 3/4" 3/4" Buah 6,400
234 Kenie Drat Gl 1" 1" Buah 9,550
235 Kenie Drat Gl 1 1/4" 1 1/4" Buah 15,300
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
236 Kenie Drat Gl 1 1/2" 1 1/2" Buah 18,900
237 Kenie Drat Gl 2" 2" Buah 29,900
238 Kenie Drat Gl 2 1/2" 2 1/2" Buah 57,000
239 Kenie Drat Gl 3" 3" Buah 86,900
240 Kenie Drat Gl 4" 4" Buah 157,600
241 Kenie Drat Gl 6" 6" Buah 624,950
242 Kenie PVC 1/2" 1/2" Buah 1,250
243 Kenie PVC 3/4" 3/4" Buah 2,700
244 Kenie PVC 1" 1" Buah 4,200
245 Kenie PVC 1 1/4" 1 1/4" Buah 5,650
246 Kenie PVC 1 1/2" 1 1/2" Buah 9,100
247 Kenie PVC 2" 2" Buah 14,550
248 Kenie PVC 2 1/2" 2 1/2" Buah 24,250
249 Kenie PVC 3" 3" Buah 38,600
250 Kenie PVC 4" 4" Buah 91,100
251 Kenie PVC 6" 6" Buah 409,800
252 Kran Air 1/2" 1/2" Buah 25,500
253 Kran Air 3/4" 3/4" Buah 36,400
254 Las Boch 1/2" 1/2" Buah 9,850
255 Las Boch 3/4" 3/4" Buah 15,400
256 Las Boch 1" 1" Buah 21,700
257 Las Boch 2" 2" Buah 34,650
258 Las Boch 3" 3" Buah 57,850
259 Las Boch 4" 4" Buah 106,150
260 Las Boch 6" 6" Buah 246,400
261 Las Boch 8" 8" Buah 620,550
262 Las Boch 10" 10" Buah 1,070,550
263 Las Boch 12" 12" Buah 1,918,450
264 Las Boch 14" 14" Buah 2,743,750
265 Las Boch 16" 16" Buah 3,622,900
266 manometer 0 Buah 184,250
267 Reduser All Flange 3" x 2" 3" x 2" Buah 156,200
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
268 Reduser All Flange 4" x 2" 4" x 2" Buah 173,100
269 Reduser All Flange 4" x 3" 4" x 3" Buah 250,500
270 Reduser All Flange 6" x 2" 6" x 2" Buah 318,850
271 Reduser All Flange 6" x 3" 6" x 3" Buah 391,650
272 Reduser All Flange 6" x 4" 6" x 4" Buah 610,350
273 Reduser All Flange 8" x 2" 8" x 2" Buah 651,400
274 Reduser All Flange 8" x 3" 8" x 3" Buah 710,500
275 Reduser All Flange 8" x 4" 8" x 4" Buah 774,350
276 Reduser All Flange 8" x 6" 8" x 6" Buah 819,800
277 Reduser All Flange 10" x 2" 10" x 2" Buah 860,850
278 Reduser All Flange 10" x 3" 10" x 3" Buah 901,800
279 Reduser All Flange 10" x 4" 10" x 4" Buah 942,900
280 Reduser All Flange 10" x 6" 10" x 6" Buah 1,003,050
281 Reduser All Flange 10" x 8" 10" x 8" Buah 1,229,850
282 Reduser All Flange 12" x 3" 12" x 3" Buah 1,339,250
283 Reduser All Flange 12" x 4" 12" x 4" Buah 1,412,000
284 Reduser All Flange 12" x 6" 12" x 6" Buah 1,494,000
285 Reduser All Flange 12" x 8" 12" x 8" Buah 1,630,750
286 Reduser All Flange 12" x 10" 12" x 10" Buah 1,712,650
287 Reduser All Flange 14" x 4" 14" x 4" Buah 1,521,300
288 Reduser All Flange 14" x 6" 14" x 6" Buah 1,630,750
289 Reduser All Flange 14" x 8" 14" x 8" Buah 1,803,750
290 Reduser All Flange 14" x 10" 14" x 10" Buah 2,086,200
291 Reduser All Flange 14" x 12" 14" x 12" Buah 2,231,950
292 Reduser All Flange 16" x 6" 16" x 6" Buah 1,703,500
293 Reduser All Flange 16" x 8" 16" x 8" Buah 2,095,250
294 Reduser All Flange 16" x 10" 16" x 10" Buah 2,514,400
295 Reduser All Flange 16" x 12" 16" x 12" Buah 2,687,450
296 Reduser All Flange 16" x 14" 16" x 14" Buah 3,006,250
297 Reduser All Socket PVC RR 3" x 2" 3" x 2" Buah 94,500
298 Reduser All Socket PVC RR 4" x 2" 4" x 2" Buah 138,050
299 Reduser All Socket PVC RR 4" x 3" 4" x 3" Buah 151,800
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
300 Reduser All Socket PVC RR 6" x 3" 6" x 3" Buah 244,500
301 Reduser All Socket PVC RR 6" x 4" 6" x 4" Buah 277,700
302 Reduser All Socket PVC RR 8" x 6" 8" x 6" Buah 505,550
303 Reduser All Socket PVC RR 10" x 6" 10" x 6" Buah 751,250
304 Reduser All Socket PVC RR 10" x 8" 10" x 8" Buah 928,900
305 Reduser PVC moof 1 1/2" x 1" 1 1/2" x 1" Buah 5,750
306 Reduser PVC moof 2" x 1 1/2" 2" x 1 1/2" Buah 16,250
307 Reduser PVC moof 2" x 1" 2" x 1" Buah 19,100
308 Reduser PVC moof 3" x 2" 3" x 2" Buah 47,850
309 Reduser PVC moof 4" x 2" 4" x 2" Buah 72,300
310 Reduser PVC moof 4" x 3" 4" x 3" Buah 83,550
311 Reduser PVC moof 6" x 3" 6" x 3" Buah 160,100
312 Reduser PVC moof 6" x 4" 6" x 4" Buah 173,750
313 Reduser PVC moof 8" x 6" 8" x 6" Buah 340,400
314 Reduser PVC moof 10" x 6" 10" x 6" Buah 583,450
315 Reduser PVC moof 10" x 8" 10" x 8" Buah 713,150
316 Screnner Cl 2" 2" Buah 236,250
317 Screnner Cl 3" 3" Buah 330,600
318 Screnner Cl 4" 4" Buah 446,000
319 Screnner Cl 6" 6" Buah 1,040,850
320 Screnner Cl 8" 8" Buah 1,408,150
321 Screnner Cl 10" 10" Buah 1,934,500
322 Screnner Cl 12" 12" Buah 2,511,700
323 Single Air Valve 1/2" 1/2" Buah 164,000
324 Single Air Valve 3/4" 3/4" Buah 164,000
325 Single Air Valve 1" 1" Buah 176,700
326 Single Air Valve 2" 2" Buah 637,650
327 Single Air Valve 3" 3" Buah 774,350
328 Single Air Valve 4" 4" Buah 865,400
329 Single Air Valve 6" 6" Buah 1,248,000
330 Sock Drat Gl 1/2" 1/2" Buah 3,850
331 Sock Drat Gl 3/4" 3/4" Buah 4,900
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
332 Sock Drat Gl 1" 1" Buah 8,050
333 Sock Drat Gl 1 1/4" 1 1/4" Buah 11,400
334 Sock Drat Gl 1 1/2" 1 1/2" Buah 14,050
335 Sock Drat Gl 2" 2" Buah 21,700
336 Sock Drat Gl 2 1/2" 2 1/2" Buah 40,700
337 Sock Drat Gl 3" 3" Buah 59,700
338 Sock Drat Gl 4" 4" Buah 97,850
339 Sock Drat Gl 6" 6" Buah 298,800
340 Sock Drat Dalam PVC 1/2" 1/2" Buah 2,600
341 Sock Drat Dalam PVC 3/4" 3/4" Buah 3,250
342 Sock Drat Dalam PVC 1" 1" Buah 4,900
343 Sock Drat Dalam PVC 1 1/4" 1 1/4" Buah 6,400
344 Sock Drat Dalam PVC 1 1/2" 1 1/2" Buah 8,500
345 Sock Drat Dalam PVC 2" 2" Buah 15,200
346 Sock Drat Dalam PVC 2 1/2" 2 1/2" Buah 22,250
347 Sock Drat Dalam PVC 3" 3" Buah 31,900
348 Sock Drat Dalam PVC 4" 4" Buah 62,050
349 Sock Drat Luar PVC 1/2" 1/2" Buah 1,650
350 Sock Drat Luar PVC 3/4" 3/4" Buah 2,300
351 Sock Drat Luar PVC 1" 1" Buah 3,450
352 Sock Drat Luar PVC 1 1/4" 1 1/4" Buah 6,050
353 Sock Drat Luar PVC 1 1/2" 1 1/2" Buah 8,400
354 Sock Drat Luar PVC 2" 2" Buah 14,700
355 Sock Drat Luar PVC 2 1/2" 2 1/2" Buah 20,550
356 Sock Drat Luar PVC 3" 3" Buah 31,900
357 Sock Drat Luar PVC 4" 4" Buah 62,550
358 Stop Kran 1/2" 1/2" Buah 34,400
359 Stop Kran 3/4" 3/4" Buah 48,150
360 Stop Kran 1" 1" Buah 64,150
361 Stop Kran 1 1/4" 1 1/4" Buah 128,300
362 Stop Kran 1 1/2" 1 1/2" Buah 168,300
363 Stop Kran 2" 2" Buah 184,250
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
364 Stop Kran 2 1/2" 2 1/2" Buah 384,800
365 Stop Kran 3" 3" Buah 737,600
366 Stop Kran 4" 4" Buah 1,010,200
367 Straatpot 2" 2" Buah 59,600
368 Straatpot 3" 3" Buah 73,250
369 Straatpot 4" 4" Buah 106,450
370 Straatpot 6" 6" Buah 149,300
371 Straatpot 8" 8" Buah 545,650
372 Straatpot 10" 10" Buah 636,600
373 Straatpot 12" 12" Buah 852,800
374 Tee All Flange 2" x 2" 2" x 2" Buah 271,000
375 Tee All Flange 3" x 2" 3" x 2" Buah 364,750
376 Tee All Flange 3" x 3" 3" x 3" Buah 410,650
377 Tee All Flange 4" x 2" 4" x 2" Buah 406,450
378 Tee All Flange 4" x 3" 4" x 3" Buah 468,900
379 Tee All Flange 4" x 4" 4" x 4" Buah 521,100
380 Tee All Flange 6" x 2" 6" x 2" Buah 573,150
381 Tee All Flange 6" x 3" 6" x 3" Buah 614,850
382 Tee All Flange 6" x 4" 6" x 4" Buah 781,500
383 Tee All Flange 6" x 6" 6" x 6" Buah 928,500
384 Tee All Flange 8" x 2" 8" x 2" Buah 729,500
385 Tee All Flange 8" x 3" 8" x 3" Buah 937,850
386 Tee All Flange 8" x 4" 8" x 4" Buah 990,000
387 Tee All Flange 8" x 6" 8" x 6" Buah 1,073,400
388 Tee All Flange 8" x 8" 8" x 8" Buah 1,141,100
389 Tee All Flange 10" x 2" 10" x 2" Buah 1,172,400
390 Tee All Flange 10" x 3" 10" x 3" Buah 1,261,050
391 Tee All Flange 10" x 4" 10" x 4" Buah 1,375,700
392 Tee All Flange 10" x 6" 10" x 6" Buah 1,421,550
393 Tee All Flange 10' x 8" 10' x 8" Buah 1,658,050
394 Tee All Flange 10" x 10" 10" x 10" Buah 1,800,100
395 Tee All Flange 12" x 2" 12" x 2" Buah 1,478,050
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
396 Tee All Flange 12" x 3" 12" x 3" Buah 1,506,400
397 Tee All Flange 12" x 4" 12" x 4" Buah 1,610,550
398 Tee All Flange 12" x 6" 12" x 6" Buah 1,750,850
399 Tee All Flange 12" x 8" 12" x 8" Buah 1,771,750
400 Tee All Flange 12" x 10" 12" x 10" Buah 2,084,450
401 Tee All Flange 12" x 12" 12" x 12" Buah 2,273,750
402 Tee All Flange 14" x 14" 14" x 14" Buah 3,126,550
403 Tee All Flange 16" x 2" 16" x 2" Buah 2,434,950
404 Tee All Flange 16" x 3" 16" x 3" Buah 2,648,100
405 Tee All Flange 16" x 4" 16" x 4" Buah 2,823,300
406 Tee All Flange 16" x 6" 16" x 6" Buah 3,135,900
407 Tee All Flange 16" x 8" 16" x 8" Buah 3,552,850
408 Tee All Flange 16" x 10" 16" x 10" Buah 4,073,850
409 Tee All Flange 16" x 12" 16" x 12" Buah 4,263,500
410 Tee All Flange 16" x 14" 16" x 14" Buah 4,860,300
411 Tee All Flange 16" x 16" 16" x 16" Buah 5,277,300
412 Tee All Socket PVC moof 1 1/2" x 1 1/2" 1 1/2" x 1 1/2" Buah 14,800
413 Tee All Socket PVC moof 2" x 2" 2" x 2" Buah 50,900
414 Tee All Socket PVC moof 3" x 2" 3" x 2" Buah 86,200
415 Tee All Socket PVC moof 3" x 3" 3" x 3" Buah 102,750
416 Tee All Socket PVC moof 4" x 2" 4" x 2" Buah 136,500
417 Tee All Socket PVC moof 4" x 3" 4" x 3" Buah 160,100
418 Tee All Socket PVC moof 4" x 4" 4" x 4" Buah 169,350
419 Tee All Socket PVC moof 6" x 2" 6" x 2" Buah 294,300
420 Tee All Socket PVC moof 6" x 3" 6" x 3" Buah 295,050
421 Tee All Socket PVC moof 6" x 4" 6" x 4" Buah 324,000
422 Tee All Socket PVC moof 6" x 6" 6" x 6" Buah 384,300
423 Tee All Socket PVC moof 8" x 3" 8" x 3" Buah 758,200
424 Tee All Socket PVC moof 8" x 4" 8" x 4" Buah 705,050
425 Tee All Socket PVC moof 8" x 6" 8" x 6" Buah 888,050
426 Tee All Socket PVC moof 8" x 8" 8" x 8" Buah 975,550
427 Tee All Socket PVC moof 10" x 6" 10" x 6" Buah 1,656,900
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
428 Tee All Socket PVC moof 10" x 8" 10" x 8" Buah 1,786,250
429 Tee All Socket PVC moof 10" x 10" 10" x 10" Buah 1,073,800
430 Tee All Socket PVC RR 2" X 2" 2" X 2" Buah 110,750
431 Tee All Socket PVC RR 3" X 2" 3" X 2" Buah 160,100
432 Tee All Socket PVC RR 3" X 3" 3" X 3" Buah 182,250
433 Tee All Socket PVC RR 4" X 2" 4" X 2" Buah 246,100
434 Tee All Socket PVC RR 4" X 3" 4" X 3" Buah 274,650
435 Tee All Socket PVC RR 4" X 4" 4" X 4" Buah 301,950
436 Tee All Socket PVC RR 6" X 2" 6" X 2" Buah 377,350
437 Tee All Socket PVC RR 6" X 3" 6" X 3" Buah 439,700
438 Tee All Socket PVC RR 6" X 4" 6" X 4" Buah 486,750
439 Tee All Socket PVC RR 6" X 6" 6" X 6" Buah 560,900
440 Tee All Socket PVC RR 8" x 3" 8" x 3" Buah 999,150
441 Tee All Socket PVC RR 8" x 4" 8" x 4" Buah 962,700
442 Tee All Socket PVC RR 8" x 6" 8" x 6" Buah 1,161,900
443 Tee All Socket PVC RR 8" x 8" 8" x 8" Buah 1,294,400
444 Tee All Socket PVC RR 10" x 6" 10" x 6" Buah 3,349,800
445 Tee All Socket PVC RR 10" x 8" 10" x 8" Buah 3,920,350
446 Tee All Socket PVC RR 10" x 10" 10" x 10" Buah 2,891,350
447 Tee Drat Gl 1/2" 1/2" Buah 5,650
448 Tee Drat Gl 3/4" 3/4" Buah 8,400
449 Tee Drat Gl 1" 1" Buah 13,400
450 Tee Drat Gl 1 1/4" 1 1/4" Buah 20,050
451 Tee Drat Gl 1 1/2" 1 1/2" Buah 25,500
452 Tee Drat Gl 2" 2" Buah 38,000
453 Tee Drat Gl 2 1/2" 2 1/2" Buah 86,900
454 Tee Drat Gl 3" 3" Buah 114,100
455 Tee Drat Gl 4" 4" Buah 206,400
456 Tee Drat Gl 6" 6" Buah 733,500
457 Tee Y All Flange 2" X 2" 2" X 2" Buah 364,750
458 Tee Y All Flange 3" X 2" 3" X 2" Buah 490,950
459 Tee Y All Flange 3" X 3" 3" X 3" Buah 552,700
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
460 Tee Y All Flange 4" X 2" 4" X 2" Buah 547,150
461 Tee Y All Flange 4" X 3" 4" X 3" Buah 631,250
462 Tee Y All Flange 4" X 4" 4" X 4" Buah 701,400
463 Tee Y All Flange 6" X 2" 6" X 2" Buah 771,600
464 Tee Y All Flange 6" X 3" 6" X 3" Buah 827,600
465 Tee Y All Flange 6" X 4" 6" X 4" Buah 1,052,300
466 Tee Y All Flange 6" X 6" 6" X 6" Buah 1,250,000
467 Tee Y All Flange 8" x 2" 8" x 2" Buah 982,050
468 Tee Y All Flange 8" x 3" 8" x 3" Buah 1,262,600
469 Tee Y All Flange 8" x 4" 8" x 4" Buah 1,332,750
470 Tee Y All Flange 8" x 6" 8" x 6" Buah 1,445,000
471 Tee Y All Flange 8" x 8" 8" x 8" Buah 1,536,250
472 Tee Y All Flange 10" x 2" 10" x 2" Buah 1,578,250
473 Tee Y All Flange 10" x 3" 10" x 3" Buah 1,697,500
474 Tee Y All Flange 10" x 4" 10" x 4" Buah 1,851,850
475 Tee Y All Flange 10" x 6" 10" x 6" Buah 1,913,700
476 Tee Y All Flange 10' x 8" 10' x 8" Buah 2,231,950
477 Tee Y All Flange 10" x 10" 10" x 10" Buah 2,423,150
478 Tee Y All Flange 12" x 2" 12" x 2" Buah 1,989,600
479 Tee Y All Flange 12" x 3" 12" x 3" Buah 2,027,950
480 Tee Y All Flange 12" x 4" 12" x 4" Buah 2,168,100
481 Tee Y All Flange 12" x 6" 12" x 6" Buah 2,357,000
482 Tee Y All Flange 12" x 8" 12" x 8" Buah 2,384,950
483 Tee Y All Flange 12" x 10" 12" x 10" Buah 2,805,900
484 Tee Y All Flange 12" x 12" 12" x 12" Buah 3,060,850
485 Tee Y All Flange 14" x 14" 14" x 14" Buah 4,208,700
486 Tee Y All Flange 16" x 2" 16" x 2" Buah 3,277,750
487 Tee Y All Flange 16" x 3" 16" x 3" Buah 3,564,750
488 Tee Y All Flange 16" x 4" 16" x 4" Buah 3,800,650
489 Tee Y All Flange 16" x 6" 16" x 6" Buah 4,221,500
490 Tee Y All Flange 16" x 8" 16" x 8" Buah 4,782,600
491 Tee Y All Flange 16" x 10" 16" x 10" Buah 5,484,150
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
492 Tee Y All Flange 16" x 12" 16" x 12" Buah 5,739,300
493 Tee Y All Flange 16" x 14" 16" x 14" Buah 6,542,650
494 Tee Y All Flange 16" x 16" 16" x 16" Buah 7,103,950
495 Verlup Sock Gl 3/4" 3/4" Buah 6,400
496 Verlup Sock Gl 1" 1" Buah 8,600
497 Verlup Sock Gl 1 1/4" 1 1/4" Buah 12,700
498 Verlup Sock Gl 1 1/2" 1 1/2" Buah 15,300
499 Verlup Sock Gl 2" 2" Buah 23,100
500 Verlup Sock Gl 2 1/2" 2 1/2" Buah 43,350
501 Verlup Sock Gl 3" 3" Buah 68,000
502 Verlup Sock Gl 4" 4" Buah 124,950
503 Verlup Sock Gl 6" 6" Buah 332,300
504 Water meter 1/2" 1/2" Buah 134,050
505 Water meter 3/4" 3/4" Buah 201,150
506 Water meter 1" 1" Buah 377,150
507 Water meter 2" 2" Buah 1,173,350
508 Water meter 3" 3" Buah 1,341,050
509 Water meter 4" 4" Buah 2,011,450
510 Water meter 6" 6" Buah 2,514,400
511 Water meter 8" 8" Buah 3,687,700
512 Water meter 10" 10" Buah 5,866,850
513 Water meter Amico 1/2" 1/2" Buah 251,350
514 Water mor 1/2" 1/2" Buah 15,400
515 Water mor 3/4" 3/4" Buah 18,900
516 Water mor 1" 1" Buah 23,100
517 Water mor 1 1/4" 1 1/4" Buah 32,550
518 Water mor 1 1/2" 1 1/2" Buah 43,350
519 Water mor 2" 2" Buah 62,450
520 Water mor 2 1/2" 2 1/2" Buah 108,650
521 Water mor 3" 3" Buah 171,150
522 Water mor 4" 4" Buah 326,100
R BAHAN BESI
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
BESI BETON (BB)
1 BB TARIK 4 mm 3,8 mm lonjor 11,550
2 BB TARIK 4 mm 4 mm lonjor 12,600
3 BB TARIK 5 mm 4,2 mm lonjor 13,700
4 BB TARIK 6 mm 5,2 mm lonjor 19,250
5 BB TARIK 6 mm 5,6 mm lonjor 21,800
6 BB TARIK 6 mm 5,8 mm lonjor 23,700
7 BB 8 SRB SNI 7,1 mm lonjor 35,650
8 BB 10 SRB SNI 9,1 mm lonjor 56,250
9 BB 12 SRB SNI 11,2 mm lonjor 80,450
10 BB D 13 SRB SNI 12,2 mm lonjor 101,950
11 BB D 16 SRB SNI 15,2 mm lonjor 155,750
12 BB 8 SPI BJKU 7 mm lonjor 33,400
13 BB 10 SPI BJKU 8,7 mm lonjor 51,150
14 BB 12 SPI BJKU 10,5 mm lonjor 72,650
15 BB 8 MSS BJKU 6,2 mm lonjor 28,100
16 BB 10 MSS BJKU 8 mm lonjor 43,850
17 BB 12 MSS BJKU 9,5 mm lonjor 60,050
18 BB 8 TJ SNI 7,5 mm lonjor 37,800
19 BB 10 TJ SNI 9,5 mm lonjor 59,800
20 BB 12 TJ SNI 11,5 mm lonjor 84,850
21 BB D 10 TJ SNI 9,5 mm lonjor 61,150
22 BB D 13 TJ SNI 12,5 mm lonjor 104,850
23 BB D 16 TJ SNI 15,5 mm lonjor 158,800
24 BB D 19 TJ SNI 18,5 mm lonjor 224,050
25 BB 8 IBD SNI 7,8 mm lonjor 40,350
26 BB 10 IBD SNI 9,8 mm lonjor 62,950
27 BB 12 IBD SNI 11,8 mm lonjor 89,600
28 BB D 13 IBD SNI ( Ulir ) 12,8 mm lonjor 107,450
29 BB D 16 IBD SNI ( Ulir ) 15,8 mm lonjor 162,800
30 BB D 19 IBD SNI ( Ulir ) 18,8 mm lonjor 228,600
31 BB 16 TJ SNI ( Polos ) 15,5 mm lonjor 154,750
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
1 Alluminium strip m' 30,850
1 Bendrat/Kawat Ikat Beton Kg 14,050
2 Besi beton ulir Kg 13,060
3 Besi bulat st 60 Kg 19,780
3 Besi canal Kg 16,000
4 Besi kanal U 50 mm Batang 279,900
38 Besi plat 5 mm x 4 ft x 8 ft Lembar 1,632,500
4 Besi plate Kg 19,300
5 Besi plate strip Kg 19,300
41 Besi Profil WF 200 mm Kg 21,900
42 Besi Profil WF 300 mm Kg 17,500
43 Besi Profil WF 400 mm Kg 16,900
6 Besi Profil WF Kg 16,900
7 Besi siku Kg 12,700
45 Besi siku L 30.30.3 Kg 12,700
45 Besi siku L 50.50.5 Kg 12,700
46 Besi siku L 60.60.6 Kg 12,700
8 Besi strip 2 cm Kg 20,450
9 Besi strip 5/8 x 3 Kg 10,250
8 Besi beton polos Kg 12,894
50 Pipa Besi Galvanis 3/4 ( Pipa) Mtr 40,200
51 Pipa galvanis 1,5 " Meter 56,150
52 Pipa Galvanis 1" Batang 221,400
53 Pipa Galvanis 1,25" Batang 258,900
54 Pipa Besi Q 8" Meter 598,500
55 Pipa Besi Q 6" Meter 315,000
56 Pipa Besi Q 5" Meter 210,000
57 Pipa Besi Q 2,5" Meter 115,500
58 Pipa Besi Q 2" Meter 42,000
59 Pipa Besi Q 1,25" Meter 36,750
9 Besi Hollow 5 Cm x 5 Cm Lonjor 123,000
10 Besi Hollow 4 Cm x 4 Cm Lonjor 97,750
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
11 Besi Hollow 4 Cm x 2 Cm Lonjor 63,250
62 Plat Uk 1.2 Mm M 196,350
63 Plat Tutup Pipa 6" Buah 21,000
64 Plat Tutup Pipa 8" Buah 52,500
65 Plat Tutup Pipa 2,5" Buah 10,500
66 Plendes 45 Cm X 45 Cm X 2 Cm Buah 210,000
67 Plendes 50 Cm X 50 Cm X 2 Cm Buah 315,000
68 Plat Gerbil 25 Cm X 13 Cm X 0,8 Cm Buah 42,000
69 Plat Gerbil 15 Cm X 18 Cm X 0,8 Cm Buah 31,500
12 Daun pintu aluminium 8 cm coklat m' 165,250
13 Daun pintu aluminium 8 cm perak m' 154,750
14 Kawat duri m' 4,025
14 Kusen aluminium 4" coklat m' 123,900
15 Kusen aluminium 4" perak m' 113,600
75 Pasang pintu kaca tbl 10 - 12 mm dgn engsel tanam m² 1,962,100
16 Roling door Aluminium m² 445,625
17 Roling door Aluminium + ongkos pasang m² 826,100
18 Sunscreen Aluminium ( non kusen ) m' 33,050
79 Sok Drat Galvanis 1 " Buah 5,450
80 Sok Drat Galvanis 3/4 " Buah 4,200
81 Sok Drat PVC 3/4 Buah 1,550
82 Timah hitam Kg 172,200
19 mur baut ¼" x 1½" Buah 1,150
20 Baut 19 Mm Buah 31,500
85 Kerangka Besi T. 40 Unit 1,749,050
17 Warmes 2.4 x 5.1 (8 mm) Roll 654,150
18 Baja WF Jembatan (Finish galvanis) kg 32,775
19 Kusen Alumunium 4" (YKK) m' 138,000
20 Pintu swing silver + kaca polos 5 mm, floor hinge dorma BTS 84 m2 1,293,750
21 Pintu swing coklat + kaca polos 5 mm, foor hinge dorma BTS 84 m2 1,437,500
22 Pintu frameless ( tempered 12 mm polos) floor hinge dorma BTS 84 m2 1,900,000
23 Pintu frameless ( tempered 12 mm rayban) floor hinge dorma BTS 84 m2 2,075,000
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
24 Pintu swing + kaca polos 5 mm m2 645,000
25 Jendela sliding silver ( 60 x 120) + kaca polos 5 mm m2 635,000
26 Jendela sliding coklat ( 60 x 120) + kaca polos 5 mm m2 718,750
27 Jendela casement silver ( 60 x 120) + kaca polos 5 mm m2 595,000
28 Jendela casement coklat ( 60 x 120) + kaca polos 5 mm m2 550,000
29 Powder coating aluminium berbagai warna m2 23,000
30 Perforated Metal m2 227,700
31 Alumunium Composite Panel m2 333,500
32 Boundex/Spandex m2 276,000
33 Hollow 2/4 - 4m plafond btg 23,000
34 Hollow 4/4 - 4m plafond btg 28,000
35 Galvalume C-075 6m btg 83,000
36 Galvalume reng 6m btg 33,500
37 Floor Hinge dekkson set 1,700,000
38 Patch Fitting dekkson bh 550,000
39 Shower Hinge dekkson set 700,000
40 Casement Handel dekkson bh 33,500
S BAHAN KAWAT
1 Kawat Las Listrik Kg 30,850
2 Jendela Naco Daun 52,900
3 Jendela Naco Lengkap Unit 350,150
4 Kawat dari 40 m/Roll besar Roll 109,600
5 Kawat dari 40 m/Roll kecil Roll 101,500
2 Kawat harmonica m' 30,000
3 Kawat harmonika besar m 38,000
4 Kawat harmonika kecil m 26,850
9 Kawat ikat beton Kg 21,200
5 Kawat ikat untuk bronjong Kg 20,050
6 Kawat nyamuk/kawat kasa Aluminium m' 27,050
7 Kawat nyamuk/kawat kasa biasa m' 15,300
8 Kawat Beronjong Fabrikasi Diameter 3 mm Uk. 2x1x0,5 m Unit 278,250
T BAHAN BETON CETAKAN
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
1 Buis beton diameter 15 cm Buah 23,400
2 Buis beton diameter 20 cm Buah 33,900
3 Buis beton diameter 30 cm Buah 42,500
4 Buis beton diameter 40 cm Buah 46,600
5 Buis beton diameter 50 cm Buah 57,300
6 Buis beton U 15 cm Buah 27,150
7 Buis beton U 20 cm Buah 36,000
8 Buis beton U 30 cm Buah 46,600
9 Buis beton U 40 cm Buah 52,900
10 Buis beton U 50 cm Buah 64,400
11 Buis beton U 1 m Buah 174,600
12 Tiang pancang beton diamtr. 300 mm
Type A2, L : 6 m m 309,750
Type A2, L : 8 m m 211,950
Type A2, L : 12 m m 196,750
13 Tiang pancang beton diamtr. 300 mm
Type A3, L : 6 m m 247,800
Type A3, L : 8 m m 232,750
Type A3, L : 12 m m 217,550
14 Tiang pancang beton diamtr. 300 mm
Type BO, L : 6 m m 275,400
Type BO, L : 8 m m 260,250
Type BO, L : 12 m m 245,050
12 Tiang pancang beton PC A Ø 300 mm - 6 m K.500 m 333,450
13 Tiang Pancang beton 20 x 20 cm K.500 m 141,000
14 Biaya pemancangan tiang pancang Ø 300 mm (Drop Hammer) m 83,450
15 Biaya pemancangan tiang pancang 20 x 20cm (Drop Hammer) m 19,300
16 Biaya pemancangan tiang pancang 20 x 20cm (Injection) m 64,150
17 mob Demob Alat Pancang Drop Hammer (Ø 300 mm) Unit 57,720,700
18 mob Demob Alat Pancang Drop Hammer (20 x 20 cm) Unit 19,240,300
19 mob Demob Alat Pancang Injection (20 x 20 cm) Unit 44,893,900
20 Box Culvert RBCB Top + RBCB Bottom, Pasang + TurunUnit 26,087,450
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
11 Box Culvert 100x100x120 3,160,000
12 Box Culvert 80x80x120 2,260,000
13 Box Culvert 60x60x120 1,221,000
14 Readymix B.0 m3 805,000
15 Beton Ready Mix K 125 m3 874,000
16 Beton Ready Mix K 175 m3 902,750
17 Beton Ready Mix K 225 m3 971,750
18 Beton Ready Mix K 250 m3 989,000
19 Beton Ready Mix K 275 m3 1,006,250
20 Beton Ready Mix K 300 m3 1,023,500
21 Beton Ready Mix K 350 m3 1,048,417
22 Beton Ready Mix K 400 m3 1,144,250
23 Beton Ready Mix K 450 m3 1,207,500
24 Beton Ready Mix K 500 m3 1,265,000
U BAHAN UNTUK PENGECATAN / BAHAN FINISHING
1 Bronze Kg 53,750
2 Cat kayu, besi merk Emco STD Kg 53,750
3 Cat menie (besi/kayu) sejenis cap Pedang Kg 28,000
3 Cat tembok Vinilek, Aviapaint (sejenis) Kg 24,000
4 Cat tembok Interior (mowilex) Kg 42,000
5 Cat tembok Eksterior (Pentalux) Kg 69,900
7 Cerlak Kg 114,750
8 Dempul Kg 28,750
6 Glass block Buah 27,050
10 Karet Roll 12,900
11 Kertas gosok 1 1/2 Lembar 77,450
12 Kuas No. 1" Buah 3,550
13 Kuas No. 2 1/2" Buah 3,350
14 Kuas No. 3" Buah 7,200
7 K u a s No. 4" Buah 9,100
8 Lem kayu Kg 28,750
17 menie A Kg 26,850
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
18 menie B Kg 14,700
19 milamin Liter 50,150
20 minyak cat / afduner Liter 11,400
21 mur, Baut 1/2", 5/8", 7/8" Kg 25,050
9 Plamur besi Kg 40,250
10 Plamur kayu Kg 20,000
11 Plamur tembok Kg 8,600
12 Politur Liter 53,750
13 Sealand Tube 32,200
14 Soda api Kg 26,750
15 Spiritus Liter 17,950
16 Thinner Liter 21,000
30 Splite pen Buah 25,500
31 Teer Liter 50,150
32 Teak oil Liter 15,850
17 Vernis Liter 27,025
18 Cat marka kg 33,150
19 Glass Beads (manik-manik kaca) kg 39,650
20 Menie Besi kg 27,000
21 Cat Tembok Weather Coat - putih ltr 70,500
22 Cat Tembok Weather Coat - warna ltr 100,050
V PEKERJAAN KONSTRUKSI IRIGASI
A. Bahan
1 Bambu Petung Batang 16,550
2 Gedek bambu 2 x 3 m Lembar 25,600
2 Ijuk Kg 19,800
4 Filter Oil Unit 141,000
5 Filter Solar Unit 87,150
6 Film Foto Fuji Roll 43,550
7 Album Foto Buah 28,200
B. Alat Bantu
1 Gergaji besi Buah 14,050
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
2 Kotak adukan Buah 32,000
3 Kasut kayu Buah 7,750
4 Cuci film Roll 20,550
5 Universal Curent meter F1,3 metal Propele Seba Unit 123,895,350
6 Curent meter C.31, metal Propeler A.OTT Unit 116,607,500
7 Litering Set HOPE Set 5,830,300
8 Electronic Digital Theodolite DT 500 SOKKIA Unit 55,971,600
9 Electronic Digital Theodolite DT 2E SOKKIA Unit 106,345,950
10 Alumunium Levelling Staves (6x3,2 cm) 5 TS 5-5 EB Unit 1,415,150
11 Square Pile 20x20 cm Prestress K-500 4 EA diam. 7 mm PC Wire m' 163,150
12 Theodolite - Topcon DT 202 Unit 93,532,200
- Topcon DT 205 Unit 57,915,150
- Topcon DT 209 Unit 46,162,600
- Nikon NE 100 Unit 34,632,450
- Nikon NE 101 Unit 36,775,050
- Nikon NE 102 Unit 50,345,250
13 Waterpass - Topcon ATG 6 Unit 8,075,000
- Nikon AX - 2S Unit 6,879,900
- Nikon AC - 2S Unit 7,594,100
- Nikon AP - 8 Unit 10,450,950
14 Curentmeter - Flowatch FL - 03 JDC made in Swiss Unit 13,371,950
- Flowprobe Global Water made in USA Unit 14,657,450
- made in England Unit 25,915,950
15 Bak Ukur 5 meter Unit 1,317,600
16 Current meter Tatonas TH-02 Unit 38,866,350
W PEKERJAAN PINTU AIR ( PENGAIRAN )
A. Bahan
1 Bahan konstruksi
- Bronze Kg 41,650
2 Bahan dikerjakan mesin
- Bos Bronze Kg 116,550
- Besi Cor Kg 8,700
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
- Baja Cor ( Roda gigi m.100 (337 Kg ) Ps 3,039,000
3 Bahan bahan lain
- Nipple Buah 44,400
- Spie Buah 17,600
- Drucklager kecil/besar Buah 421,250
- Angker Bolt (20 kg) Buah 23,100
- Seal Buah 3,850
- Na F + ring Buah 190,950
- Seal karet m² 291,450
- Stang pemutar Buah 205,150
B. Ongkos Kerja
4 Ongkos kerja
- Ongkos kerja konst Kg 3,300
- Ongkos kerja mesin Kg 14,400
- Ongkos kerja kayu m³ 825,200
- Sandblasting m² 97,000
- Pengecatan tanpa sand m² 46,100
5 Pemasangan Kg 3,400
6 Pembongkaran Kg 2,200
7 Transport Kg 2,200
X ONGKOS DAN BAHAN PENYEDIAAN AIR BERSIH
A ONGKOS PENGEBORAN SAmPAI KEDALAmAN 60 m
1 Pengeboran dan Psg Casing Ø 2" s/d 3" (Tanah Biasa) m' 183,300
2 Pengeboran dan Psg Casing Ø 4" s/d 6" (Tanah Biasa) m' 244,300
3 Pengeboran dan Psg Casing Ø 8" s/d 10" (Tanah Biasa) m' 305,400
4 Pengeboran dan Psg Casing Ø 2" s/d 3" (Tanah keras) m' 244,300
5 Pengeboran dan Psg Casing Ø 4" s/d 6" (Tanah keras) m' 305,400
6 Pengeboran dan Psg Casing Ø 8" s/d 10" (Tanah keras) m' 366,500
B BAHAN PEKERJAAN PENGEBORAN dan PENYEDIAAN AIR BERSIH
1 Aqua Del (40 kg) zak 233,200
2 Bentonit (40 kg) zak 145,800
3 Lem Pipa kg 40,300
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
4 Wall pipe 0,5 x 2" m' 427,200
5 Wall pipe 0,5 x 3" m' 487,500
6 Wall pipe 0,5 x 42" m' 730,250
7 Wall pipe 0,5 x 6" m' 846,050
8 Wall pipe 0,5 x 8" m' 991,500
9 Generator Set 10 KVA (open) Unit 18,190,800
10 Generator Set 15 KVA (open) Unit 27,286,100
11 Generator Set 20 KVA (open) Unit 36,381,550
12 Generator Set 25 KVA (open) Unit 45,476,850
13 Generator Set 35 KVA (open) Unit 63,667,650
14 Generator Set 40 KVA (open) Unit 72,763,000
15 Profil Tank 1000L Unit 1,982,250
16 Profil Tank 2000L Unit 3,964,650
17 Profil Tank 4000L Unit 7,929,250
18 Profil Tank 5000L Unit 9,911,650
19 Tutup manhole 0,4 x 0,4 Unit 320,650
20 Tutup manhole 0,5 x 0,5 Unit 349,850
21 Tutup manhole 0,6 x 0,6 Unit 408,100
22 Tutup Box Valve 0,6 x 0,6 Unit 408,100
23 Tutup Box Valve 0,8 x 0,8 Unit 583,050
Y PERALATAN BERAT (PEK. JALAN DAN JEmBATAN)
1 Asphalt mixing Plant Unit 5,964,472,050
2 Asphalt Finisher 30 HP Unit 3,171,723,100
3 Asphalt Sprayer 350 l Unit 84,540,400
4 Bulldozer 110 HP Unit 1,200,497,200
5 Compressor 150 L\m Unit 74,628,750
6 Concrete mixer 0,5/0,45 m² (20 HP) Unit 139,023,750
7 Crane 10 -15 T Unit 474,592,400
8 Dump Truck 3 Ton Unit 215,723,750
9 Dump Truck 5 Ton Unit 269,363,200
10 Excavator Unit 658,832,150
11 Dump Truck 3,5 Ton (Flat Bed Truck 4 T) 115 HP Unit 177,779,700
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
12 Generator Set Unit 146,932,650
13 motor Grader >100 HP Unit 1,838,404,250
14 Trac Loader 75-100 HP Unit 815,435,950
15 Wheel Loader 80 HP Unit 650,232,000
16 Three Wheel Roller 8/10 T Unit 301,686,800
17 Tandem Roller 8/10 T. Unit 520,787,400
18 Tire Roller 15 T. Unit 755,612,300
19 Vibratory Roller 5-8 T. Unit 320,670,500
20 Concrete Vibrator 4 HP Unit 11,825,100
21 Stone Crusher 200 HP Unit 1,650,905,850
22 Water Pump Unit 9,266,000
23 Water Tanker 115 HP Unit 183,166,900
24 Pedestrian Roller Unit 79,817,850
25 Plate Stamper 4 HP Unit 18,947,000
26 Jack Hammer Unit 57,137,600
27 Fulvi mixer Unit 1,049,467,200
28 Dump Truk unit 367,500,000
29 Kontainer Armroll unit 52,500,000
30 Sepeda Motor Gerobak unit 34,996,500
31 Truck Crane unit 840,000,000
32 Baby Roller unit 105,000,000
33 Skate Mate Digital unit 210,000
34 Wheel Meter unit 1,050,000
35 Fleld CBR Test unit 26,250,000
36 Sand Cone Test unit 5,775,000
37 Genset Portabel (AC-DC)/Lampu TL unit 6,825,000
38 Temperature Gauge unit 1,312,500
39 Hammer Test unit 13,125,000
40 Mesin Vertikal untuk cone drill unit 10,500,000
41 Centrifugal Extractor unit 13,650,000
42 Winch/Chain Block unit 7,350,000
43 Digital teodolit total station unit 38,850,000
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
Z ALAT LABORATORIUM
1 Core Drilling Test Set Set 34,960,900
2 Field CBR Test Set Set 15,849,000
3 Dutch Cone Penetrometer Set 43,453,200
4 Hand Bor Set 7,647,150
5 Standart Penetratian Test Set 22,440,450
6 Digital Balance (Timbangan digital) Set 28,663,600
7 Digital Caliper 300 mm/12" Buah 2,157,200
8 Vernier Caliper 150 mm Buah 192,450
9 Vernier Caliper 300 mm Buah 844,300
10 Hydraulic Cylinder Buah 6,355,100
11 Hydraulic Hand Pump Buah 10,057,300
12 Hydaulic Dutch Cone Penetrometer (5 ton cap.) Set 122,437,750
13 GPS Waterprof Set 14,226,100
LAIN LAIN
1 Papan nama proyek Unit 408,100
2 Atap Ilalang 15,000
1 Roster Buah 5,650
2 Roster Keramik 30/30 Buah 20,000
3 Batu paras m² 83,850
4 Batu tempel hitam m² 100,550
5 Sewa alat / pekerjaan las jam 40,300
6 Pengelasan cm 2,400
7 milamin liter 47,250
8 Engsel pintu Aluminium stenlees Unit 44,900
9 Engsel pintu Aluminium biasa Unit 40,300
10 Engsel jendela Aluminium stenlees Unit 38,500
11 Grendel jendela Aluminium mutu baik Buah 35,250
12 Grendel jendela Aluminium biasa Buah 32,000
13 Grendel pintu Unit 64,350
14 Kunci pintu Aluminium Buah 209,150
15 Sealand tube 35,250
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
16 Karet Roll 48,150
17 Pasang pintu kaca tbl 10 - 12 mm dgn engsel tanam m² 1,528,650
18 Gypsum board 9 mm merk Elephant uk. 1,20 x 2,40 m Lembar 75,600
19 Gypsum board 9 mm merk Indal uk. 1,20 x 2,40 m Lembar 70,850
5 List gypsum m' 24,250
6 Pembangunan Pagar BRC (tinggi 1,2m) mtr 649,400
22 Pintu pagar besi Onda mtr 643,750
23 Pagar besi mtr 1,106,250
24 Pembuatan sumur bor mtr 147,200
25 Pintu kaca tremped 12 mm Unit 4,693,350
26 Daun jendela alumunium isi kaca rayben uk 130x60 cm Buah 502,950
27 Daun jendela alumunium isi kaca rayben uk 60x45 cm Buah 301,650
28 Hand railling tangga pipa ulir m² 705,350
29 Hand railling tangga stainless m² 897,850
7 Plafon gypsum rangka metal furing m² 114,450
8 Pintu PVC lengkap Buah 285,000
9 Kran air leher angsa Buah 90,000
10 Tempat sabun besar Buah 43,550
34 Clean out stenllis Buah 42,800
11 Avour lantai stenllis Buah 42,800
36 Penangkal Petir 90 mtr (lengkap) Unit 3,356,400
12 Galian strous diam 30 m m' 47,000
13 Galian strous diam 40 m m' 53,550
12 Waterprofing Kg 50,150
40 Precast motif Unit 201,150
13 mesin Pompa ( Jet Pump ) 300 W Unit 1,782,500
42 Pipa Porous m 44,300
43 Plastik Filter m² 15,200
44 Air Bersih untuk konstruksi Liter 2,500
45 Gebalan Rumput m² 17,500
46 Plat Rambu (Eng. Grade) Buah 205,150
47 Plat Rambu (High I. Grade) Buah 329,700
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
48 Rel Pengaman (Guardrill Plat) m 481,100
49 Wallpaper m' 20,450
50 Upah Jasa Pompa Air hari 1,166,000
51 Upah Jasa mesin Foto Copy Buah 1,166,000
52 Upah Jasa mesin Potong Rumput hari 583,050
53 Jepit Gypsum Kecil m 16,350
54 Jepit Gypsum Sedang m 21,000
55 Jepit Gypsum Besar m 25,600
56 Kanopi m² 105,000
57 Kanopi dan kerangka Unit 524,650
58 Rel Pintu Dorong m 285,700
14 Pas. Bak Cuci Stenlist Buah 524,650
15 Shower Kamar mandi Buah 291,450
16 Hand Shower Buah 151,600
17 Kran Shower Double Flow Buah 157,350
18 Kunci Pintu Solid Buah 262,350
19 Engsel Pintu Solid Stel 87,450
20 Grendel Tanam Solid Buah 145,800
21 Door Closer Solid Buah 300,000
67 Pas. Lampu Downlight 20 Watt Reflector Strip Buah 215,750
22 Kran Leher Angsa Buah 101,850
69 Font mirror untuk papan nama kantor / m² 2,915,200
70 Hak Angin Solid Buah 87,450
23 Saklar Tunggal Tens Buah 40,800
24 Saklar Ganda Tens Buah 52,350
73 Rak Sabun Stainless + Kaca Set 320,650
74 Shower Hot and Cool Solid Buah 874,500
75 Shower Tray Buah 874,500
76 Water Heather Gas Buah 495,600
77 Water Profing 2 Komponen (Sikatop 107 Seal) gln 419,750
78 Pagar Besi minimalis Pipa besi persegi 1.4mm m² 577,150
79 Pintu Dorong/Geser minimalis Pipa besi persegi 1.4mm, Plat Eser m² 693,800
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
Rangka besi pipa galvanis/pipa
80 Kanopi/Awning m² 495,600
persegi, Atap Twinlite
81 Patok Beton K. 125, Besi Beton 10 mm Buah 489,700
82 Batu Gilang m² 105,600
83 Batu Kerikil halusФ 0.2 s/d 0.5 cm Sak 37,350
84 Batu Kerikil halusФ 1 s/d 2 cm Sak 37,350
85 Semen nat warna muda Kg 6,900
25 Dolken kayu galam uk. 10/4 m Biji 11,550
87 Kayu Sengon m² 1,399,200
88 papan sengon m² 1,865,700
26 Profil Aluminium m² 104,450
27 Profil Kaca m² 8,050
28 Paku Sekrup 10 cm Biji 200
23 Rangka Atap galvalum m² 186,550
93 Besi Hollow 4x4 cm 6m Batang 113,700
94 Elektroda baja Kg 33,900
95 Paving Stoen motif K300 m² 66,450
96 Grass Black motif K300 m² 60,150
97 Atap Tegola tebal 3 mm Buah 214,600
98 Bubungan Tegola Buah 31,350
24 Polycarbonat 5 mm Twinlinte m² 110,000
25 Polycarbonat 10 mm Twinlinte m² 160,000
26 Solartuff m² 300,000
27 Air Liter 15
28 minyak bekisting Liter 18,650
102 Formite Buah 8,700
harga
103 Solar Liter
pemerintah
104 Kaca Cermin tb. 5 mm m² 105,000
105 Kaca Cermin Tebal 5 mm befel m 346,500
106 Sewa Alat welding Jam 10,250
107 Text font 40 cm neon fiber Buah 145,800
108 Text font 10 cm neon stainless Buah 87,450
109 Kabel NYF GBY 4x4 m² 62,550
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
110 Kabel NYY 3 x 2,5 mm m² 14,050
111 Kabel NYYHY 4 x 2,5 mm m² 20,450
112 Lampu TL 2x18 W/220 V komplit balas,kaca Set 180,700
113 Isolator Buah 1,650
114 Pipa 5/8" Batang 21,600
115 T Doos PVC Buah 4,900
116 Las Doof Pcs 700
117 LP + Fuse panel Pcs 22,750
118 Volt + Vss Pcs 423,250
119 Ampere meter + ct Pcs 423,250
120 Box Panel Pcs 1,418,300
121 Grounding BC 6 mm Unit 315,800
122 Upah Wiring panel Ls 408,100
123 Upah pasang panel Ls 466,400
124 Landscape Titik 87,450
125 Tangki air Stainles Steel 1000 lt Blue Marlin, bahan fiber, Volume Unit 2,565,350
126 Tangki air 3000 ltr Uk. D. 163 Tebal 163, Buah 5,323,500
127 Tenda Plafon Biasa tinggi
Ukuran198
: Unit 3,206,700
P. 5m X L.3m X T.depan 3m X T.
Belakang 2,75 m
Atap : Terpal
128 Tenda Kerucut Ukuran : Unit 3,206,700
P. 3m X L.3m X T.Tiang
Atap : Terpaulin
129 Gerobak Dorong /Rombong Ukuran : Unit 2,623,600
P.150 cm X L.60 cm X T.180 cm.
( termasuk roda )
Atap : Seng
Kerangka : kayu mahoni
Dinding : multiplek
Kaca : Bening 3mm
Roda 2 sejenis roda sepeda motor
dengan ban baru
130 Gerobak PKL KaSet Ukuran : Unit 2,623,600
P.150 cm X L.60 cm X T.150 cm.
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
Kerangka : kayu tahunan 4 cm X 6 Cm
Dinding : Triplek di cat
Roda 2 sejenis roda sepeda motor
dengan ban baru
131 Raise Florr M² 964,650
132 Biaya Intalasi Raise Floor M² 179,150
133 Franco Banyuwangi & Packaging Material Ls 3,445,300
134 Akomodasi Teknisi Ls 2,048,250
135 Double Cup Filter Ls 735,000
136 Lem Besi Buah 6,700
137 Paku Cor Kg 10,050
138 Paku Triplek Kg 22,150
139 Paku Triplek 2 Cm Kg 22,150
140 Paku Reng 2,5 Cm Kg 20,650
141 Paku Reng 2 Cm Kg 20,650
142 Paku Dur 3 Cm Kg 20,050
143 Testpen Buah 9,450
144 Avo meter 1000 K Buah 73,800
145 Seng Talang meter 30,200
146 Seng Gelombang Pj = 2,40 m Lembar 75,700
147 Asbes Gelombang Pj = 2,40 m Lembar 40,800
148 Tenol Solder 1,2 mm Roll 40,300
149 Contack Cliner ( American ) Kaleng 41,550
150 Sifon Wastafel Buah 18,750
151 Kran Wastafel Buah 56,250
152 Kran Kuningan Buah 26,750
153 Pacul Baja Buaya ( Besar ) Buah 67,050
154 Kunci Pintu Bruno ( Besar ) Buah 88,500
155 Gembok Goldoor 40 mm Buah 77,050
156 Gembok Goldoor 50 mm Buah 97,200
157 Triplek Alumunium Pintu 5 mm Lembar 107,300
158 Triplek micca Lembar 73,800
159 Palu Pengungkit Buah 26,750
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
160 Pisau Potong Rumput Buah 80,500
161 mesin Ketam Buah 301,650
162 Aqua Proof Kaleng 57,000
163 Gunting Seng Buah 14,700
164 Lem Elteco Buah 5,450
165 mata Gergaji Baja Buah 1,609,200
166 Bambu Besar Batang 40,300
167 Bambu Umbul Umbul Batang 20,050
168 Standar Ramp Steel Dimensi 100 mmX 100 mm Unit 2,625,000
169 Facia + Intalasi Double Cup Filter M² 380,600
170 Insulation Termal PE Mariba M² 360,900
171 Digital Door Lock Samsung Unit 5,250,000
172 Floor Hinge Dekkson Dekkson Unit 997,500
173 Peralatan Palang Pintu Elektronik
-Barier gate buah 23,625,000
-Remote buah 262,500
-Recever buah 525,000
-Braket dan Housing Outdoor buah 393,750
-DVR Stand Alone 4 chanel buah 3,281,250
-TV LED 19" Thosiba buah 1,706,250
-Biaya Pemasangan Ls 3,675,000
Pompa Air
1 Power Kwh 0,55 Gronfos type 2 6,570,750
2 Power Kwh 1,1 Gronfos type 2 7,911,850
3 Power Kwh 1,5 Gronfos type 6 9,118,600
4 Power Kwh 3 Gronfos type 6 10,714,500
5 Power Kwh 2,2 Gronfos type 8 9,520,950
6 Power Kwh 3 Gronfos type 8 13,275,750
Panel Sumber Sibel C/W Water Lever Control Double Lengkap
1 0,55 - 1,5 Kwh 4,291,100
2 2,2 - 3 Kwh 5,028,750
Alat - Alat Bengkel
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
1 mesin Bubut Kayu Oscar Unit 5,247,350
2 mesin Bubut Kayu Wipro Unit 1,749,050
3 Pisau Bubut Unit 1,166,000
4 mesin Kompresor Wipro Unit 3,206,700
5 Gerenda Duduk Wipro Unit 1,166,000
6 Gergaji meja Wipro Unit 1,166,000
7 Bandsaw / Bensaw Wipro Unit 1,049,450
8 Jigsaw Wipro Unit 1,049,450
9 Planner Ketam Tangan Wipro Unit 874,500
10 Planner Ketam meja Wipro Unit 5,830,300
11 mesin Bor duduk Wipro Unit 2,332,150
12 mesin Bor Set 408,100
13 mata Bor 1 Set :
a. 1/4 " Wipro 14,050
b. 5/16 " Wipro 17,500
c. 3/8 " Wipro 26,750
d. 1/2 " Wipro 35,050
e. 5/8 " Wipro 81,650
f. 3/4 " Wipro 151,600
14 Sprayer Cat Wipro Unit 174,900
15 Selang Plastik Wipro Unit 11,000
16 mesin Rempelas Wipro Unit 699,600
17 Insulation meter (Alat Ukur Tahanan Kyoritsu Unit 5,830,300
Isolasi Instalasi)
18 Tang meter (Alat Ukur Arus Listrik) Kyoritsu Unit 2,915,200
19 Eart meter (Alat Ukur Pertanahan Kyoritsu Unit 5,713,750
Penyalur Petir/Grounding)
20 Fanbelt :
GenSet A - 55 bergigi Bando Buah 209,850
Kompresor B -74 Bando Buah 81,650
Breker Tester A - 55 Bando Buah 69,900
21 Ragum (Penjepit Besi) uk. sedang Set 349,850
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
22 Slag Letter dan Angka (Alat Cetak Huruf dan Angka) Set 408,100
23 Engkol Shock (Prohex) Set 1,010,200
24 Gergaji Besi Buah 57,300
25 Mata Bor Set 145,800
26 Pakan Las (Elektrode Las Listrik RB 26) Pack 298,800
Kapasitas
27 Handbeban
Forklif1000 - 2000 kg, max lifting height min 1500 mm, Fork length min 900Unit
mm, Lifting15,392,150
course/rated min 15 mm/time
PEmELIHARAAN KAPAL
Body Kapal
1 Fiber Deck Set 6,360,450
2 Interior Plafon Kabin (Bekled) Set 2,332,150
3 Pintu Kabin Unit 1,325,100
4 Bahan Pengecatan
Amplas 250 Lembar 3,250
Amplas 400 Lembar 3,250
Amplas 600 Lembar 3,250
Anti Fuoling Galon 477,100
Cat Anti Gores Kg 185,400
Cat mobil - Warna Biru Dongker Kg 105,000
- Warna Putih Kg 105,000
Compound Kg 37,050
Dempul mobil Sanpolac @ 3 kg Galon 68,850
Epoxy Primer Kg 159,050
Thinner Galon 106,050
Perlengkapan Kapal Lainnya
1 Busi BR - 8 HS 10 Buah 63,600
2 Packing Set 583,050
3 Panel Elecktrik Set 583,050
4 Remote Kontrol Panel Set 5,830,300
5 Wiper Set 1,775,650
HARGA RESPONDEN
NO JENIS PEKERJAAN URAIAN SATUAN
SATUAN 1 2
1 Sewa Direksikeet < 200 jt 750,000
2 Sewa Direksikeet 200 < 1000jt 1,000,000
3 Sewa Direksikeet 1 < 2 M 1,500,000
4 Sewa Direksikeet > 2 M konstruksi
5 Pembersihan Kembali < 200 jt 500,000
6 Pembersihan Kembali 200 < 1000jt 1,000,000
7 Pembersihan Kembali 1 < 2 M 1,500,000
8 Pembersihan Kembali > 2 M
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola

5,350 5,350 6,153 5,350 5,350 5,350 5,350 4,800


6,400 6,400 7,360 6,400 6,400 6,400 6,400 5,800
4,400 4,400 5,060 4,400 4,400 4,400 4,400 4,000
3,350 3,350 3,853 3,350 3,350 3,350 3,350 3,000
4,050 4,050 4,658 4,050 4,050 4,050 4,050 3,600
7,950 7,950 9,143 7,950 7,950 7,950 7,950 7,200
9,600 9,600 11,040 9,600 9,600 9,600 9,600 8,700

3,550 3,550 4,083 3,550 3,550 3,550 3,550 3,200


5,350 5,350 6,153 5,350 5,350 5,350 5,350 4,800
6,900 6,900 7,935 6,900 6,900 6,900 6,900 6,200
8,800 8,800 10,120 8,800 8,800 8,800 8,800 8,000
10,500 10,500 12,075 10,500 10,500 10,500 10,500 9,500
19,300 19,300 22,195 19,300 19,300 19,300 19,300 17,500
28,350 28,350 32,603 28,350 28,350 28,350 28,350 25,700
#DIV/0! #DIV/0! 16,200 #DIV/0! #DIV/0! 9,200 #DIV/0!

9,850 9,850 11,328 9,850 9,850 9,850 9,850 9,850


107,800 107,800 123,970 107,800 107,800 107,800 107,800 98,000
43,150 43,150 49,623 43,150 43,150 43,150 43,150 39,200
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 90,000 #DIV/0! #DIV/0! 90,000 #DIV/0!
#DIV/0! #DIV/0! 70,000 #DIV/0! #DIV/0! 70,000 #DIV/0!
#DIV/0! #DIV/0! 60,000 60,000 60,000 60,000 54,500
#DIV/0! #DIV/0! 90,000 #DIV/0! #DIV/0! 90,000 #DIV/0!
90,000 90,000 99,000 80,000 80,000 80,000 80,000 80,000
#DIV/0! #DIV/0! 70,000 70,000 70,000 70,000 63,600
#DIV/0! #DIV/0! 85,000 #DIV/0! #DIV/0! 85,000 #DIV/0!
#DIV/0! #DIV/0! 75,000 #DIV/0! #DIV/0! 75,000 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 50,000 50,000 50,000 50,000 45,400
#DIV/0! #DIV/0! 75,000 75,000 75,000 75,000 68,100
#DIV/0! #DIV/0! 60,000 60,000 60,000 60,000 54,500
#DIV/0! #DIV/0! 80,000 #DIV/0! #DIV/0! 80,000 #DIV/0!
75,000 75,000 82,500 50,000 70,000 70,000 70,000 70,000
#DIV/0! #DIV/0! 85,000 85,000 85,000 85,000 77,200
#DIV/0! #DIV/0! 90,000 #DIV/0! #DIV/0! 90,000 #DIV/0!
100,000 100,000 110,000 80,000 80,000 80,000 80,000 80,000
#DIV/0! #DIV/0! 75,000 75,000 75,000 75,000 68,100
#DIV/0! #DIV/0! 90,000 90,000 90,000 90,000 81,800
#DIV/0! #DIV/0! 110,000 #DIV/0! #DIV/0! 110,000 #DIV/0!
#DIV/0! #DIV/0! 100,000 #DIV/0! #DIV/0! 100,000 #DIV/0!
#DIV/0! #DIV/0! 60,000 #DIV/0! #DIV/0! 60,000 #DIV/0!
#DIV/0! #DIV/0! 75,000 #DIV/0! #DIV/0! 75,000 #DIV/0!
#DIV/0! #DIV/0! 50,000 #DIV/0! #DIV/0! 50,000 #DIV/0!
#DIV/0! #DIV/0! 105,000 #DIV/0! #DIV/0! 105,000 #DIV/0!
#DIV/0! #DIV/0! 110,000 #DIV/0! #DIV/0! 110,000 #DIV/0!
#DIV/0! #DIV/0! 150,000 #DIV/0! #DIV/0! 150,000 #DIV/0!
#DIV/0! #DIV/0! 45,000 185,000 185,000 185,000 #DIV/0!
#DIV/0! #DIV/0! 40,000 40,000 40,000 40,000 36,300
#DIV/0! #DIV/0! 75,000 75,000 75,000 75,000 68,100
#DIV/0! #DIV/0! 80,000 #DIV/0! #DIV/0! 80,000 #DIV/0!
#DIV/0! #DIV/0! 90,000 #DIV/0! #DIV/0! 90,000 #DIV/0!
80,000 80,000 88,000 75,000 75,000 75,000 75,000 75,000
#DIV/0! #DIV/0! 85,000 #DIV/0! #DIV/0! 85,000 #DIV/0!
#DIV/0! #DIV/0! 75,000 #DIV/0! #DIV/0! 75,000 #DIV/0!
#DIV/0! #DIV/0! 90,000 #DIV/0! #DIV/0! 90,000 #DIV/0!
90,000 90,000 99,000 80,000 80,000 80,000 80,000 80,000

#DIV/0! #DIV/0! 70,000 #DIV/0! #DIV/0! 70,000 #DIV/0!


#DIV/0! #DIV/0! 80,000 #DIV/0! #DIV/0! 80,000 #DIV/0!
#DIV/0! #DIV/0! 60,000 #DIV/0! #DIV/0! 60,000 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 60,000 #DIV/0! #DIV/0! 60,000 58,000
60,000 60,000 66,000 52,500 52,500 52,500 52,500 52,500

#DIV/0! #DIV/0! 10,255 10,255 10,255 10,255 10,255


#DIV/0! #DIV/0! 9,100 9,100 9,100 8,200
#DIV/0! #DIV/0! 8,050 8,050 8,050 7,300
#DIV/0! #DIV/0! 10,000 10,000 10,000 10,000 10,000
#DIV/0! #DIV/0! 8,785 8,785 8,785 8,785 8,785
#DIV/0! #DIV/0! 9,750 9,750 9,750 8,800
#DIV/0! #DIV/0! 124,000 124,000 124,000 112,700
#DIV/0! #DIV/0! 99,200 99,200 99,200 90,100
#DIV/0! #DIV/0! 96,700 96,700 96,700 87,900
#DIV/0! #DIV/0! 96,700 96,700 96,700 87,900
#DIV/0! #DIV/0! 186,550 186,550 186,550 186,550 169,500
#DIV/0! #DIV/0! 209,000 #DIV/0! #DIV/0! 209,000 #DIV/0!
#DIV/0! #DIV/0! 209,000 #DIV/0! #DIV/0! 209,000 #DIV/0!
#DIV/0! #DIV/0! 264,000 264,000 264,000 264,000 240,000
#DIV/0! #DIV/0! 264,000 #DIV/0! #DIV/0! 264,000 #DIV/0!
#DIV/0! #DIV/0! 264,000 #DIV/0! #DIV/0! 264,000 #DIV/0!
#DIV/0! #DIV/0! 550 #DIV/0!
#DIV/0! #DIV/0! 149,000 149,000 149,000 149,000 135,400
#DIV/0! #DIV/0! 149,000 #DIV/0! #DIV/0! 149,000 #DIV/0!
#DIV/0! #DIV/0! 149,000 #DIV/0! #DIV/0! 149,000 #DIV/0!
#DIV/0! #DIV/0! 209,000 209,000 209,000 209,000 190,000
#DIV/0! #DIV/0! 209,000 #DIV/0! #DIV/0! 209,000 #DIV/0!
#DIV/0! #DIV/0! 209,000 #DIV/0! #DIV/0! 209,000 #DIV/0!
#DIV/0! #DIV/0! 105,000 #DIV/0! #DIV/0! 105,000 #DIV/0!
#DIV/0! #DIV/0! 400,000 #DIV/0! #DIV/0! 400,000 #DIV/0!
#DIV/0! #DIV/0! 350,000 #DIV/0! #DIV/0! 350,000 #DIV/0!
#DIV/0! #DIV/0! 315,000 #DIV/0! #DIV/0! 315,000 #DIV/0!
#DIV/0! #DIV/0! 280,000 #DIV/0! #DIV/0! 280,000 #DIV/0!
#DIV/0! #DIV/0! 120,100 #DIV/0! #DIV/0! 120,100 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 600 #DIV/0! #DIV/0! 600 #DIV/0!
#DIV/0! #DIV/0! - 28,450 28,450 28,450 25,800
#DIV/0! #DIV/0! - 99,200 99,200 99,200 90,100
#DIV/0! #DIV/0! - 96,700 96,700 96,700 87,900
#DIV/0! #DIV/0! 734,350 734,350 734,350 734,350 667,500
#DIV/0! #DIV/0! 409,600 #DIV/0! #DIV/0! 409,600 #DIV/0!
#DIV/0! #DIV/0! 24,850 #DIV/0! #DIV/0! 24,850 21,600
#DIV/0! #DIV/0! - #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! 34,000 #DIV/0! #DIV/0! 34,000 30,000
#DIV/0! #DIV/0! 34,000 #DIV/0! #DIV/0! 34,000 30,000
#DIV/0! #DIV/0! 69,000 #DIV/0! #DIV/0! 69,000 #DIV/0!
#DIV/0! #DIV/0! 71,500 #DIV/0! #DIV/0! 71,500 #DIV/0!
#DIV/0! #DIV/0! harga pemerint #DIV/0! #DIV/0! 18,000 #DIV/0!
#DIV/0! #DIV/0! - 128,900 128,900 128,900 117,100
#DIV/0! #DIV/0! 200,000 #DIV/0! #DIV/0! 200,000 #DIV/0!
#DIV/0! #DIV/0! 185,000 #DIV/0! #DIV/0! 185,000 #DIV/0!
#DIV/0! #DIV/0! 150,000 #DIV/0! #DIV/0! 150,000 #DIV/0!
#DIV/0! #DIV/0! harga pemerint #DIV/0! #DIV/0! 7,050 #DIV/0!
#DIV/0! #DIV/0! 129,000 #DIV/0! #DIV/0! 129,000 #DIV/0!
#DIV/0! #DIV/0! harga pemerint #DIV/0! #DIV/0! 5,650 #DIV/0!
#DIV/0! #DIV/0! 74,750 74,750 74,750 74,750 67,900
#DIV/0! #DIV/0! 57,200 57,200 57,200 52,000
#DIV/0! #DIV/0! 74,750 #DIV/0! #DIV/0! 74,750 #DIV/0!
#DIV/0! #DIV/0! 67,275 #DIV/0! #DIV/0! 67,275 #DIV/0!
#DIV/0! #DIV/0! 67,200 67,200 67,200 61,000
#DIV/0! #DIV/0! 57,750 57,750 57,750 52,500
#DIV/0! #DIV/0! 74,400 74,400 74,400 67,600
#DIV/0! #DIV/0! 60,900 60,900 60,900 55,300
#DIV/0! #DIV/0! 48,300 48,300 48,300 43,900
#DIV/0! #DIV/0! 64,700 #DIV/0! #DIV/0! 64,700 #DIV/0!
#DIV/0! #DIV/0! 75,600 75,600 75,600 #DIV/0!
#DIV/0! #DIV/0! 92,600 #DIV/0! #DIV/0! 92,600 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 93,000 #DIV/0! #DIV/0! 93,000 #DIV/0!
#DIV/0! #DIV/0! 108,000 #DIV/0! #DIV/0! 108,000 #DIV/0!
#DIV/0! #DIV/0! - #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! 315,000 450,000 450,000 450,000 #DIV/0!
#DIV/0! #DIV/0! 550 #DIV/0! #DIV/0! 550 #DIV/0!
#DIV/0! #DIV/0! 3,700 #DIV/0! #DIV/0! 3,700 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 80,500 #DIV/0!
#DIV/0! #DIV/0! 13,340 #DIV/0! #DIV/0! 13,340 #DIV/0!
#DIV/0! #DIV/0! 10,350 #DIV/0! #DIV/0! 10,350 #DIV/0!
#DIV/0! #DIV/0! 316,000 #DIV/0! #DIV/0! 316,000 #DIV/0!
#DIV/0! #DIV/0! 108,000 #DIV/0! #DIV/0! 108,000 #DIV/0!
#DIV/0! #DIV/0! 1,430 #DIV/0! #DIV/0! 1,430 #DIV/0!
#DIV/0! #DIV/0! 259.25 #DIV/0! #DIV/0! 259.25 #DIV/0!
#DIV/0! #DIV/0! 127,850 #DIV/0! #DIV/0! 127,850 #DIV/0!
#DIV/0! #DIV/0! harga pemerint #DIV/0! #DIV/0! 8,450 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 10,120 #DIV/0! #DIV/0! 10,120 #DIV/0!
#DIV/0! #DIV/0! - 9,100 9,100 9,100 8,200
#DIV/0! #DIV/0! - 8,050 8,050 8,050 7,300
#DIV/0! #DIV/0! - 124,000 124,000 124,000 112,700
#DIV/0! #DIV/0! - 99,200 99,200 99,200 90,100
#DIV/0! #DIV/0! - 96,700 96,700 96,700 87,900
#DIV/0! #DIV/0! - 96,700 96,700 96,700 87,900
#DIV/0! #DIV/0! - 128,900 128,900 128,900 117,100
#DIV/0! #DIV/0! - 500 500 500 400
#DIV/0! #DIV/0! - 1,350 1,350 1,350 1,200
#DIV/0! #DIV/0! - 28,450 28,450 28,450 25,800
#DIV/0! #DIV/0! - 99,200 99,200 99,200 90,100
#DIV/0! #DIV/0! - 96,700 96,700 96,700 87,900
#DIV/0! #DIV/0! - 734,350 734,350 734,350 667,500
#DIV/0! #DIV/0! - 300,000 300,000 300,000 300,000
#DIV/0! -
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! - 17,500 17,500 17,500 15,900
#DIV/0! #DIV/0! - 2,300 2,300 2,300 2,000
#DIV/0! #DIV/0! - 32,550 32,550 32,550 29,500
#DIV/0! #DIV/0! - 45,450 45,450 45,450 41,300
#DIV/0! #DIV/0! - 57,200 57,200 57,200 52,000
#DIV/0! #DIV/0! - 69,900 69,900 69,900 63,500
#DIV/0! #DIV/0! - 9,850 9,850 9,850 8,900
#DIV/0! #DIV/0! - 11,000 11,000 11,000 10,000
#DIV/0! #DIV/0! - 13,500 13,500 13,500 12,200
#DIV/0! #DIV/0! - 15,200 15,200 15,200 13,800
#DIV/0! #DIV/0! - 9,850 9,850 9,850 8,900
#DIV/0! #DIV/0! - 11,750 11,750 11,750 10,600
#DIV/0! #DIV/0! - 13,500 13,500 13,500 12,200
#DIV/0! #DIV/0! - 349,850 349,850 349,850 318,000
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! - 16,450 16,450 16,450 14,900
#DIV/0! #DIV/0! - 900 900 900 800
#DIV/0! #DIV/0! - 93,100 93,100 93,100 84,600
#DIV/0! #DIV/0! - 10,600 10,600 10,600 9,600
#DIV/0! #DIV/0! - 35,800 35,800 35,800 32,500
#DIV/0! #DIV/0! - 57,300 57,300 57,300 52,000
#DIV/0! #DIV/0! - 24,000 24,000 24,000 21,800
#DIV/0! #DIV/0! - 11,300 11,300 11,300 10,200
#DIV/0! #DIV/0! - 329,800 329,800 329,800 299,800
#DIV/0! #DIV/0! - 10,350 10,350 10,350 9,400
#DIV/0! #DIV/0! - 34,000 34,000 34,000 30,900
#DIV/0! #DIV/0! - 93,100 93,100 93,100 84,600
#DIV/0! #DIV/0! - 21,500 21,500 21,500 19,500
#DIV/0! #DIV/0! - 6,400 6,400 6,400 5,800
#DIV/0! #DIV/0! - 39,750 39,750 39,750 36,100
#DIV/0! #DIV/0! - 14,150 14,150 14,150 12,800
#DIV/0! #DIV/0! - 10,600 10,600 10,600 9,600
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! - 6,400 6,400 6,400 5,800
#DIV/0! #DIV/0! 138,000 #DIV/0! #DIV/0! 138,000 #DIV/0!
#DIV/0! #DIV/0! 207,000 #DIV/0! #DIV/0! 207,000 #DIV/0!
#DIV/0! #DIV/0! 276,000 #DIV/0! #DIV/0! 276,000 #DIV/0!
#DIV/0! #DIV/0! 14,375 #DIV/0! #DIV/0! 14,375 #DIV/0!
#DIV/0! #DIV/0! 94,300 #DIV/0! #DIV/0! 94,300 #DIV/0!
#DIV/0! #DIV/0! 17,250 #DIV/0! #DIV/0! 17,250 #DIV/0!
#DIV/0! #DIV/0! 33,607 #DIV/0! #DIV/0! 33,607 #DIV/0!
#DIV/0! #DIV/0! 193,200 #DIV/0! #DIV/0! 193,200 #DIV/0!
#DIV/0! #DIV/0! 402,500 #DIV/0! #DIV/0! 402,500 #DIV/0!
#DIV/0! #DIV/0! 196,318 #DIV/0! #DIV/0! 196,318 #DIV/0!
#DIV/0! #DIV/0! 4,312,500 #DIV/0! #DIV/0! 5,175,000 #DIV/0!
#DIV/0! #DIV/0! 5,462,500 #DIV/0! #DIV/0! 6,612,500 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 180,000 180,000 180,000 180,000 163,600
#DIV/0! #DIV/0! 21,000 21,000 21,000 21,000 19,000
#DIV/0! #DIV/0! 36,000 36,000 36,000 36,000 32,700
#DIV/0! #DIV/0! 75,000 75,000 75,000 75,000 68,100
#DIV/0! #DIV/0! 120,000 120,000 120,000 120,000 109,000
#DIV/0! #DIV/0! 170,000 170,000 170,000 170,000 154,500
#DIV/0! #DIV/0! 300,000 300,000 300,000 300,000 272,700
#DIV/0! #DIV/0! 375,000 375,000 375,000 375,000 340,900
#DIV/0! #DIV/0! 27,000 32,000 32,000 32,000 #DIV/0!
#DIV/0! #DIV/0! 28,000 32,000 32,000 32,000 #DIV/0!
#DIV/0! #DIV/0! 32,500 37,000 37,000 37,000 #DIV/0!
#DIV/0! #DIV/0! 30,000 36,000 36,000 36,000 #DIV/0!
#DIV/0! #DIV/0! 34,000 39,000 39,000 39,000 #DIV/0!
#DIV/0! #DIV/0! 36,500 43,000 43,000 43,000 #DIV/0!
#DIV/0! #DIV/0! 23,000 #DIV/0! #DIV/0! 23,000 #DIV/0!
#DIV/0! #DIV/0! 18,000 #DIV/0! #DIV/0! 18,000 #DIV/0!
#DIV/0! #DIV/0! 22,000 #DIV/0! #DIV/0! 22,000 #DIV/0!
#DIV/0! #DIV/0! 24,000 27,000 27,000 27,000 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 147,300 147,300 147,300 147,300 133,900
#DIV/0! #DIV/0! 13,500 13,500 13,500 13,500 12,200
#DIV/0! #DIV/0! 109,050 109,050 109,050 109,050 99,100
#DIV/0! #DIV/0! 102,450 102,450 102,450 102,450 93,100
#DIV/0! #DIV/0! 54,350 54,350 54,350 54,350 49,400
#DIV/0! #DIV/0! 118,000 118,000 118,000 118,000 107,200
#DIV/0! #DIV/0! 76,750 76,750 76,750 76,750 69,700
#DIV/0! #DIV/0! 132,300 132,300 132,300 132,300 120,200
#DIV/0! #DIV/0! 9,200 9,200 9,200 9,200 8,300
#DIV/0! #DIV/0! 487,600 487,600 487,600 487,600 443,200
#DIV/0! #DIV/0! 193,700 193,700 193,700 193,700 176,000
#DIV/0! #DIV/0! 311,200 311,200 311,200 311,200 282,900
#DIV/0! #DIV/0! 311,200 311,200 311,200 311,200 282,900
#DIV/0! #DIV/0! 817,500 817,500 817,500 817,500 743,100
#DIV/0! #DIV/0! 1,240,550 1,240,550 1,240,550 1,240,550 1,127,700
#DIV/0! #DIV/0! 896,250 896,250 896,250 896,250 814,700
#DIV/0! #DIV/0! 1,842,950 1,842,950 1,842,950 1,842,950 1,675,400
#DIV/0! #DIV/0! 649,600 649,600 649,600 649,600 590,500
#DIV/0! #DIV/0! 8,250 8,250 8,250 8,250 7,500
#DIV/0! #DIV/0! 10,150 10,150 10,150 10,150 9,200
#DIV/0! #DIV/0! 8,600 8,600 8,600 8,600 7,800
#DIV/0! #DIV/0! 146,450 146,450 146,450 146,450 133,100
#DIV/0! #DIV/0! 342,800 342,800 342,800 342,800 311,600
#DIV/0! #DIV/0! 1,357,000 1,357,000 1,357,000 1,357,000 1,233,600
#DIV/0! #DIV/0! 1,297,150 1,297,150 1,297,150 1,297,150 1,179,200
#DIV/0! #DIV/0! 23,400 23,400 23,400 23,400 21,200
#DIV/0! #DIV/0! 17,000 17,000 17,000 17,000 15,400
#DIV/0! #DIV/0! 199,900 199,900 199,900 199,900 181,700
#DIV/0! #DIV/0! 118,300 118,300 118,300 118,300 107,500
#DIV/0! #DIV/0! 76,750 76,750 76,750 76,750 69,700
#DIV/0! #DIV/0! 395,000 395,000 395,000 395,000 359,000
#DIV/0! #DIV/0! 4,900 4,900 4,900 4,900 4,400
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 3,550 3,550 3,550 3,550 3,200
#DIV/0! #DIV/0! 6,600 6,600 6,600 6,600 6,000
#DIV/0! #DIV/0! 5,000 5,000 5,000 5,000 4,500
#DIV/0! #DIV/0! 5,100 5,100 5,100 5,100 4,600
#DIV/0! #DIV/0! 3,850 3,850 3,850 3,850 3,500
#DIV/0! #DIV/0! 7,000 7,000 7,000 7,000 6,300
#DIV/0! #DIV/0! 13,200 13,200 13,200 13,200 12,000
#DIV/0! #DIV/0! 5,100 5,100 5,100 5,100 4,600
#DIV/0! #DIV/0! 4,050 4,050 4,050 4,050 3,600
#DIV/0! #DIV/0! 2,300 2,300 2,300 2,300 2,000
#DIV/0! #DIV/0! 5,100 5,100 5,100 5,100 4,600
#DIV/0! #DIV/0! 4,050 4,050 4,050 4,050 3,600
#DIV/0! #DIV/0! 8,250 8,250 8,250 8,250 7,500
#DIV/0! #DIV/0! 5,100 5,100 5,100 5,100 4,600
#DIV/0! #DIV/0! 4,400 4,400 4,400 4,400 4,000
#DIV/0! #DIV/0! 17,100 17,100 17,100 17,100 15,500
#DIV/0! #DIV/0! 80,000 #DIV/0! #DIV/0! 80,000 #DIV/0!
#DIV/0! #DIV/0! 95,000 #DIV/0! #DIV/0! 95,000 #DIV/0!
#DIV/0! #DIV/0! 120,000 #DIV/0! #DIV/0! 120,000 #DIV/0!
#DIV/0! #DIV/0! 696,150 696,150 696,150 696,150 632,800
#DIV/0! #DIV/0! 1,615,200 1,615,200 1,615,200 1,615,200 1,468,300
#DIV/0! #DIV/0! 765,850 765,850 765,850 765,850 696,200
#DIV/0! #DIV/0! 2,172,000 2,172,000 2,172,000 2,172,000 1,974,500
#DIV/0! #DIV/0! 48,150 48,150 48,150 48,150 43,700
#DIV/0! #DIV/0! 218,700 218,700 218,700 218,700 198,800
#DIV/0! #DIV/0! 48,150 48,150 48,150 48,150 43,700
#DIV/0! #DIV/0! 251,250 251,250 251,250 251,250 228,400
#DIV/0! #DIV/0! 48,150 48,150 48,150 48,150 43,700
#DIV/0! #DIV/0! 222,250 222,250 222,250 222,250 202,000
#DIV/0! #DIV/0! 55,200 55,200 55,200 55,200 50,100
#DIV/0! #DIV/0! 236,550 236,550 236,550 236,550 215,000
#DIV/0! #DIV/0! 58,900 58,900 58,900 58,900 53,500
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 258,050 258,050 258,050 258,050 234,500
#DIV/0! #DIV/0! 68,100 68,100 68,100 68,100 61,900
#DIV/0! #DIV/0! 265,300 265,300 265,300 265,300 241,100
#DIV/0! #DIV/0! 45,850 45,850 45,850 45,850 41,600
#DIV/0! #DIV/0! 48,150 48,150 48,150 48,150 43,700
#DIV/0! #DIV/0! 169,250 169,250 169,250 169,250 153,800
#DIV/0! #DIV/0! 8,250 8,250 8,250 8,250 7,500
#DIV/0! #DIV/0! 240,950 240,950 240,950 240,950 219,000
#DIV/0! #DIV/0! 137,650 137,650 137,650 137,650 125,100
#DIV/0! #DIV/0! 101,500 101,500 101,500 101,500 92,200
#DIV/0! #DIV/0! 146,550 146,550 146,550 146,550 133,200
#DIV/0! #DIV/0! 157,900 157,900 157,900 157,900 143,500
#DIV/0! #DIV/0! 3,350 3,350 3,350 3,350 3,000
#DIV/0! #DIV/0! 25,000 #DIV/0! #DIV/0! 25,000 #DIV/0!
#DIV/0! #DIV/0! 90,000 #DIV/0! #DIV/0! 90,000 #DIV/0!
#DIV/0! #DIV/0! 15,000 #DIV/0! #DIV/0! 15,000 #DIV/0!
#DIV/0! #DIV/0! 294,000 294,000 294,000 294,000 267,200
#DIV/0! #DIV/0! 372,850 372,850 372,850 372,850 338,900
#DIV/0! #DIV/0! 122,000 122,000 122,000 122,000 110,900
#DIV/0! #DIV/0! 136,250 136,250 136,250 136,250 123,800
#DIV/0! #DIV/0! 157,800 157,800 157,800 157,800 143,400
#DIV/0! #DIV/0! 121,650 121,650 121,650 121,650 110,500
#DIV/0! #DIV/0! 215,100 215,100 215,100 215,100 195,500
#DIV/0! #DIV/0! 114,750 114,750 114,750 114,750 104,300
#DIV/0! #DIV/0! 209,150 209,150 209,150 209,150 190,100
#DIV/0! #DIV/0! 136,250 136,250 136,250 136,250 123,800
#DIV/0! #DIV/0! 244,100 244,100 244,100 244,100 221,900
#DIV/0! #DIV/0! 164,950 164,950 164,950 164,950 149,900
#DIV/0! #DIV/0! 167,450 167,450 167,450 167,450 152,200
#DIV/0! #DIV/0! 85,950 85,950 85,950 85,950 78,100
#DIV/0! #DIV/0! 215,100 215,100 215,100 215,100 195,500
#DIV/0! #DIV/0! 209,150 209,150 209,150 209,150 190,100
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 244,100 244,100 244,100 244,100 221,900
#DIV/0! #DIV/0! 167,450 167,450 167,450 167,450 152,200
#DIV/0! #DIV/0! 5,450 5,450 5,450 5,450 4,900
#DIV/0! #DIV/0! 25,000 #DIV/0! #DIV/0! 28,750 #DIV/0!
#DIV/0! #DIV/0! 130,000 149,500 149,500 149,500 #DIV/0!
#DIV/0! #DIV/0! 70,000 #DIV/0! #DIV/0! 70,000 #DIV/0!
#DIV/0! #DIV/0! 60,000 #DIV/0! #DIV/0! 60,000 #DIV/0!
#DIV/0! #DIV/0! 130,000 149,500 149,500 149,500 #DIV/0!
#DIV/0! #DIV/0! 189,300 189,300 189,300 189,300 172,000
#DIV/0! #DIV/0! 39,550 39,550 39,550 39,550 35,900
#DIV/0! #DIV/0! 35,350 35,350 35,350 35,350 32,100
#DIV/0! #DIV/0! 233,700 233,700 233,700 233,700 212,400
#DIV/0! #DIV/0! 129,000 129,000 129,000 129,000 117,200
#DIV/0! #DIV/0! 82,500 82,500 82,500 82,500 75,000
#DIV/0! #DIV/0! 12,450 12,450 12,450 12,450 11,300
#DIV/0! #DIV/0! 291,450 291,450 291,450 291,450 264,900
#DIV/0! #DIV/0! 8,700 8,700 8,700 8,700 7,900
#DIV/0! #DIV/0! 3,250 3,250 3,250 3,250 2,900
#DIV/0! #DIV/0! 233,200 233,200 233,200 233,200 212,000
#DIV/0! #DIV/0! 1,750 1,750 1,750 1,750 1,500
#DIV/0! #DIV/0! 16,550 16,550 16,550 16,550 15,000
#DIV/0! #DIV/0! 29,500 29,500 29,500 29,500 26,800
#DIV/0! #DIV/0! 44,900 44,900 44,900 44,900 40,800
#DIV/0! #DIV/0! 122,500 122,500 122,500 122,500 111,300
#DIV/0! #DIV/0! 4,600 4,600 4,600 4,600 4,100
#DIV/0! #DIV/0! 633,550 633,550 633,550 633,550 575,900
#DIV/0! #DIV/0! 174,900 174,900 174,900 174,900 159,000
#DIV/0! #DIV/0! 411,900 411,900 411,900 411,900 374,400
#DIV/0! #DIV/0! 87,450 87,450 87,450 87,450 79,500
#DIV/0! #DIV/0! 3,350 3,350 3,350 3,350 3,000
#DIV/0! #DIV/0! 637,450 637,450 637,450 637,450 579,500
#DIV/0! #DIV/0! 16,900 16,900 16,900 16,900 15,300
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 150,000 150,000 150,000 150,000 136,300
#DIV/0! #DIV/0! 6,400 6,400 6,400 6,400 5,800
#DIV/0! #DIV/0! 1,750 1,750 1,750 1,750 1,500
#DIV/0! #DIV/0! 3,848,100 3,848,100 3,848,100 3,848,100 3,498,200
#DIV/0! #DIV/0! 4,925,550 4,925,550 4,925,550 4,925,550 4,477,700
#DIV/0! #DIV/0! 3,386,250 3,386,250 3,386,250 3,386,250 3,078,400
#DIV/0! #DIV/0! 2,973,350 2,973,350 2,973,350 2,973,350 2,703,000
#DIV/0! #DIV/0! 2,157,200 2,157,200 2,157,200 2,157,200 1,961,000
#DIV/0! #DIV/0! 572,350 572,350 572,350 572,350 520,300
#DIV/0! #DIV/0! 324,300 324,300 324,300 324,300 294,800
#DIV/0! #DIV/0! 77,150 77,150 77,150 77,150 70,100
#DIV/0! #DIV/0! 117,050 117,050 117,050 117,050 106,400
#DIV/0! #DIV/0! 162,750 162,750 162,750 162,750 147,900
#DIV/0! #DIV/0! 205,650 205,650 205,650 205,650 186,900
#DIV/0! #DIV/0! 40,250 40,250 40,250 36,500
#DIV/0! #DIV/0! 206,300 206,300 206,300 206,300 187,500
#DIV/0! #DIV/0! 43,550 43,550 43,550 43,550 39,500
#DIV/0! #DIV/0! 774,900 774,900 774,900 774,900 704,400
#DIV/0! #DIV/0! 188,550 188,550 188,550 188,550 171,400
#DIV/0! #DIV/0! 90,800 90,800 90,800 90,800 82,500
#DIV/0! #DIV/0! 34,200 34,200 34,200 34,200 31,000
#DIV/0! #DIV/0! 5,650 5,650 5,650 5,650 5,100
#DIV/0! #DIV/0! 79,200 79,200 79,200 79,200 72,000
#DIV/0! #DIV/0! 85,800 85,800 85,800 85,800 78,000
#DIV/0! #DIV/0! 68,650 68,650 68,650 68,650 62,400
#DIV/0! #DIV/0! 17,700 17,700 17,700 17,700 16,000
#DIV/0! #DIV/0! 75,700 75,700 75,700 75,700 68,800
#DIV/0! #DIV/0! 64,250 64,250 64,250 64,250 58,400
#DIV/0! #DIV/0! 707,050 707,050 707,050 707,050 642,700
#DIV/0! #DIV/0! 163,550 163,550 163,550 163,550 148,600
#DIV/0! #DIV/0! 3,550 3,550 3,550 3,550 3,200
#DIV/0! #DIV/0! 8,600 8,600 8,600 8,600 7,800
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 146,450 146,450 146,450 146,450 133,100
#DIV/0! #DIV/0! 342,800 342,800 342,800 342,800 311,600
#DIV/0! #DIV/0! 1,357,000 1,357,000 1,357,000 1,357,000 1,233,600
#DIV/0! #DIV/0! 435,750 435,750 435,750 435,750 396,100
#DIV/0! #DIV/0! 14,800 14,800 14,800 14,800 13,400
#DIV/0! #DIV/0! 767,750 767,750 767,750 767,750 697,900
#DIV/0! #DIV/0! 331,350 331,350 331,350 331,350 301,200
#DIV/0! #DIV/0! 331,350 331,350 331,350 331,350 301,200
#DIV/0! #DIV/0! 69,900 69,900 69,900 69,900 63,500
#DIV/0! #DIV/0! 70,650 70,650 70,650 70,650 64,200
#DIV/0! #DIV/0! 850,600 850,600 850,600 850,600 773,200
#DIV/0! #DIV/0! 3,899,550 3,899,550 3,899,550 3,899,550 3,545,000
#DIV/0! #DIV/0! 8,600 8,600 8,600 8,600 7,800
#DIV/0! #DIV/0! 19,500 19,500 19,500 19,500 17,700
#DIV/0! #DIV/0! 289,900 289,900 289,900 289,900 263,500
#DIV/0! #DIV/0! 116,550 116,550 116,550 116,550 105,900
#DIV/0! #DIV/0! 412,750 412,750 412,750 412,750 375,200
#DIV/0! #DIV/0! 816,150 816,150 816,150 816,150 741,900
#DIV/0! #DIV/0! 1,850 1,850 1,850 1,850 1,600
#DIV/0! #DIV/0! 900 900 900 900 800
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 431,250 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 212,750 #DIV/0!
#DIV/0! - - #DIV/0!
#DIV/0! #DIV/0! 900 900 900 900 900
#DIV/0! #DIV/0! 100 100 100 100 100
#DIV/0! #DIV/0! 100 100 100 100 100
#DIV/0! #DIV/0! 100 100 100 100 100
#DIV/0! #DIV/0! 162,375,950 162,375,950 162,375,950 162,375,950 147,614,500
#DIV/0! #DIV/0! 3,206,700 3,206,700 3,206,700 3,206,700 2,915,100
#DIV/0! #DIV/0! 3,498,150 3,498,150 3,498,150 3,498,150 3,180,100
#DIV/0! #DIV/0! 641,200 641,200 641,200 641,200 582,900
#DIV/0! #DIV/0! 1,148,050 1,148,050 1,148,050 1,148,050 1,043,600
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 17,491,100 17,491,100 17,491,100 17,491,100 15,901,000
#DIV/0! #DIV/0! 3,305,800 3,305,800 3,305,800 3,305,800 3,005,200
#DIV/0! #DIV/0! 408,100 408,100 408,100 408,100 371,000
#DIV/0! #DIV/0! 48,150 48,150 48,150 48,150 43,700
#DIV/0! #DIV/0! 671,550 671,550 671,550 671,550 610,500
#DIV/0! #DIV/0! 2,915,200 2,915,200 2,915,200 2,915,200 2,650,100
#DIV/0! #DIV/0! 2,040,650 2,040,650 2,040,650 2,040,650 1,855,100
#DIV/0! #DIV/0! 991,050 991,050 991,050 991,050 900,900
#DIV/0! #DIV/0! 845,450 845,450 845,450 845,450 768,500
#DIV/0! #DIV/0! 291,450 291,450 291,450 291,450 264,900
#DIV/0! #DIV/0! 1,807,450 1,807,450 1,807,450 1,807,450 1,643,100
#DIV/0! #DIV/0! 633,550 633,550 633,550 633,550 575,900
#DIV/0! #DIV/0! 524,650 524,650 524,650 524,650 476,900
#DIV/0! #DIV/0! 642,900 642,900 642,900 642,900 584,400
#DIV/0! #DIV/0! 9,850 9,850 9,850 9,850 8,900
#DIV/0! #DIV/0! 26,850 26,850 26,850 26,850 24,400
#DIV/0! #DIV/0! 48,150 48,150 48,150 48,150 43,700
#DIV/0! #DIV/0! 172,600 172,600 172,600 172,600 156,900
#DIV/0! #DIV/0! 330,950 330,950 330,950 330,950 300,800
#DIV/0! #DIV/0! 112,450 112,450 112,450 112,450 102,200
#DIV/0! #DIV/0! 5,650 5,650 5,650 5,650 5,100
#DIV/0! #DIV/0! 1,942,150 1,942,150 1,942,150 1,942,150 1,765,500
#DIV/0! #DIV/0! 404,000 404,000 404,000 404,000 367,200
#DIV/0! #DIV/0! 524,650 524,650 524,650 524,650 476,900
#DIV/0! #DIV/0! 4,489,350 4,489,350 4,489,350 4,489,350 4,081,200
#DIV/0! #DIV/0! 2,128,100 2,128,100 2,128,100 2,128,100 1,934,600
#DIV/0! #DIV/0! 2,040,650 2,040,650 2,040,650 2,040,650 1,855,100
#DIV/0! #DIV/0! 524,650 524,650 524,650 524,650 476,900
#DIV/0! #DIV/0! 5,250 5,250 5,250 5,250 4,700
#DIV/0! #DIV/0! 524,650 524,650 524,650 524,650 476,900
#DIV/0! #DIV/0! 60,650 60,650 60,650 60,650 55,100
#DIV/0! - - - -
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 2,915,200 2,915,200 2,915,200 2,915,200 2,650,100
#DIV/0! #DIV/0! 291,450 291,450 291,450 291,450 264,900
#DIV/0! #DIV/0! 87,450 87,450 87,450 87,450 79,500
#DIV/0! #DIV/0! 174,900 174,900 174,900 174,900 159,000
#DIV/0! #DIV/0! 157,350 157,350 157,350 157,350 143,000
#DIV/0! #DIV/0! 1,101,950 1,101,950 1,101,950 1,101,950 1,001,700
#DIV/0! #DIV/0! 419,750 419,750 419,750 419,750 381,500
#DIV/0! #DIV/0! 110,750 110,750 110,750 110,750 100,600
#DIV/0! #DIV/0! 14,700 14,700 14,700 14,700 13,300
#DIV/0! #DIV/0! 64,150 64,150 64,150 64,150 58,300
#DIV/0! #DIV/0! 419,750 419,750 419,750 419,750 381,500
#DIV/0! #DIV/0! 314,750 314,750 314,750 314,750 286,100
#DIV/0! #DIV/0! 116,550 116,550 116,550 116,550 105,900
#DIV/0! #DIV/0! 116,550 116,550 116,550 116,550 105,900
#DIV/0! #DIV/0! 99,200 99,200 99,200 99,200 90,100
#DIV/0! #DIV/0! 174,900 174,900 174,900 174,900 159,000
#DIV/0! #DIV/0! 145,800 145,800 145,800 145,800 132,500
#DIV/0! #DIV/0! 145,800 145,800 145,800 145,800 132,500
#DIV/0! #DIV/0! 64,150 64,150 64,150 64,150 58,300
#DIV/0! #DIV/0! 2,400 2,400 2,400 2,400 2,100
#DIV/0! #DIV/0! 11,750 11,750 11,750 11,750 10,600
#DIV/0! #DIV/0! 11,750 11,750 11,750 11,750 10,600
#DIV/0! #DIV/0! 17,500 17,500 17,500 17,500 15,900
#DIV/0! #DIV/0! 14,700 14,700 14,700 14,700 13,300
#DIV/0! #DIV/0! 8,700 8,700 8,700 8,700 7,900
#DIV/0! #DIV/0! 8,700 8,700 8,700 8,700 7,900
#DIV/0! #DIV/0! 365,600 365,600 365,600 365,600 332,300
#DIV/0! #DIV/0! 12,250 12,250 12,250 12,250 11,100
#DIV/0! #DIV/0! 145,800 145,800 145,800 145,800 132,500
#DIV/0! #DIV/0! 419,750 419,750 419,750 419,750 381,500
#DIV/0! #DIV/0! 314,750 314,750 314,750 314,750 286,100
#DIV/0! #DIV/0! 314,750 314,750 314,750 314,750 286,100
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 116,550 116,550 116,550 116,550 105,900
#DIV/0! #DIV/0! 600 600 600 600 500
#DIV/0! #DIV/0! 145,800 145,800 145,800 145,800 132,500
#DIV/0! #DIV/0! 1,750 1,750 1,750 1,750 1,500
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 265,400 #DIV/0! #DIV/0! 265,400 #DIV/0!
#DIV/0! #DIV/0! 53,000 #DIV/0! #DIV/0! 53,000 #DIV/0!
#DIV/0! #DIV/0! 42,500 #DIV/0! #DIV/0! 42,500 #DIV/0!
#DIV/0! #DIV/0! 21,500 #DIV/0! #DIV/0! 21,500 #DIV/0!
#DIV/0! #DIV/0! 7,750 7,750 7,750 7,750 7,000
#DIV/0! #DIV/0! 15,850 #DIV/0! #DIV/0! 15,850 #DIV/0!
#DIV/0! #DIV/0! 67,050 #DIV/0! #DIV/0! 67,050 #DIV/0!
#DIV/0! #DIV/0! 25,500 25,500 25,500 25,500 23,100
#DIV/0! #DIV/0! 53,550 53,550 53,550 53,550 48,600
#DIV/0! #DIV/0! 53,550 53,550 53,550 53,550 48,600
#DIV/0! #DIV/0! 14,350 23,000 23,000 23,000 #DIV/0!
#DIV/0! #DIV/0! 51,650 #DIV/0! #DIV/0! 51,650 45,600
#DIV/0! #DIV/0! 57,300 #DIV/0! #DIV/0! 57,300 #DIV/0!
#DIV/0! #DIV/0! 46,650 #DIV/0! #DIV/0! 46,650 #DIV/0!
#DIV/0! #DIV/0! 81,850 #DIV/0! 21,000 21,000 #DIV/0!
#DIV/0! #DIV/0! 56,650 #DIV/0! 16,000 16,000 #DIV/0!
#DIV/0! #DIV/0! 135,050 #DIV/0! 8,000 8,000 #DIV/0!
#DIV/0! #DIV/0! 28,750 #DIV/0! #DIV/0! 28,750 #DIV/0!
#DIV/0! #DIV/0! 14,800 #DIV/0! #DIV/0! 14,800 #DIV/0!
#DIV/0! #DIV/0! 11,750 11,750 11,750 11,750 10,600
#DIV/0! #DIV/0! 9,000 9,000 9,000 9,000 8,100
#DIV/0! #DIV/0! 21,275 #DIV/0! #DIV/0! 21,275 #DIV/0!
#DIV/0! #DIV/0! 24,725 #DIV/0! #DIV/0! 36,800 #DIV/0!
#DIV/0! #DIV/0! 20,125 #DIV/0! #DIV/0! 20,125 #DIV/0!
#DIV/0! #DIV/0! 32,583 #DIV/0! #DIV/0! 32,583 28,300
#DIV/0! #DIV/0! 12,938 #DIV/0! #DIV/0! 12,938 #DIV/0!
#DIV/0! #DIV/0! 21,500 #DIV/0! #DIV/0! 21,500 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 74,850 74,850 74,850 74,850 68,000
#DIV/0! #DIV/0! 17,100 17,100 17,100 17,100 15,500
#DIV/0! #DIV/0! 80,500 #DIV/0! #DIV/0! 80,500 #DIV/0!
#DIV/0! #DIV/0! 186,875 #DIV/0! #DIV/0! 186,875 #DIV/0!
#DIV/0! #DIV/0! 66,125 #DIV/0! #DIV/0! 66,125 #DIV/0!
#DIV/0! #DIV/0! 95,833 #DIV/0! #DIV/0! 95,833 83,300
#DIV/0! #DIV/0! 57,500 #DIV/0! #DIV/0! 57,500 #DIV/0!
#DIV/0! #DIV/0! 82,417 #DIV/0! #DIV/0! 82,417 #DIV/0!
#DIV/0! #DIV/0! 172,500 #DIV/0! #DIV/0! 172,500 #DIV/0!
#DIV/0! #DIV/0! 41,783 #DIV/0! #DIV/0! 41,783 36,000
#DIV/0! #DIV/0! 84,333 #DIV/0! #DIV/0! 84,333 73,000
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 39,750 39,750 39,750 39,750 36,100
#DIV/0! #DIV/0! 51,200 51,200 51,200 51,200 46,500
#DIV/0! #DIV/0! 57,850 57,850 57,850 57,850 52,500
#DIV/0! #DIV/0! 126,500 #DIV/0! #DIV/0! 126,500 #DIV/0!
#DIV/0! #DIV/0! 78,850 #DIV/0! #DIV/0! 78,850 #DIV/0!
#DIV/0! #DIV/0! 27,025 #DIV/0! #DIV/0! 27,025 #DIV/0!
#DIV/0! #DIV/0! 25,875 #DIV/0! #DIV/0! 25,875 #DIV/0!
#DIV/0! #DIV/0! 16,100 #DIV/0! #DIV/0! 16,100 #DIV/0!
#DIV/0! #DIV/0! 16,100 #DIV/0! #DIV/0! 16,100 #DIV/0!
#DIV/0! #DIV/0! 5,250 #DIV/0! #DIV/0! 5,250 #DIV/0!
#DIV/0! #DIV/0! 1,250 #DIV/0! #DIV/0! 1,250 #DIV/0!
#DIV/0! #DIV/0! 3,850 #DIV/0! #DIV/0! 3,850 #DIV/0!
#DIV/0! #DIV/0! 1,550 #DIV/0! #DIV/0! 1,550 #DIV/0!
#DIV/0! #DIV/0! 3,350 #DIV/0! #DIV/0! 3,350 #DIV/0!
#DIV/0! #DIV/0! 10,600 10,600 10,600 10,600 9,600
#DIV/0! #DIV/0! 2,100 2,100 2,100 2,100 1,900
#DIV/0! #DIV/0! 5,100 5,100 5,100 5,100 4,600
#DIV/0! #DIV/0! 3,450 #DIV/0! #DIV/0! 3,450 #DIV/0!
#DIV/0! #DIV/0! 11,750 #DIV/0! #DIV/0! 11,750 #DIV/0!
#DIV/0! #DIV/0! 6,800 #DIV/0! #DIV/0! 6,800 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 7,450 #DIV/0! #DIV/0! 7,450 #DIV/0!
#DIV/0! #DIV/0! 7,450 7,450 7,450 7,450 6,700
#DIV/0! #DIV/0! 96,313 #DIV/0! #DIV/0! 96,313 #DIV/0!
#DIV/0! #DIV/0! 91,425 #DIV/0! #DIV/0! 91,425 #DIV/0!
#DIV/0! #DIV/0! 38,908 #DIV/0! #DIV/0! 38,908 33,800
#DIV/0! #DIV/0! 27,025 #DIV/0! #DIV/0! 27,025 #DIV/0!
#DIV/0! #DIV/0! 11,500 #DIV/0! #DIV/0! 11,500 #DIV/0!
#DIV/0! #DIV/0! 19,550 19,550 19,550 19,550 17,700
#DIV/0! #DIV/0! 19,550 #DIV/0! #DIV/0! 19,550 #DIV/0!
#DIV/0! #DIV/0! 20,125 #DIV/0! #DIV/0! 20,125 #DIV/0!
#DIV/0! #DIV/0! 29,900 #DIV/0! #DIV/0! 29,900 #DIV/0!
#DIV/0! #DIV/0! 77,625 77,625 77,625 77,625 70,500
#DIV/0! #DIV/0! 77,625 #DIV/0! #DIV/0! 77,625 #DIV/0!
#DIV/0! #DIV/0! 97,750 #DIV/0! #DIV/0! 97,750 #DIV/0!
#DIV/0! #DIV/0! 155,250 #DIV/0! #DIV/0! 155,250 #DIV/0!
#DIV/0! #DIV/0! 103,300 103,300 103,300 103,300 93,900
#DIV/0! #DIV/0! 54,625 #DIV/0! #DIV/0! 54,625 #DIV/0!
#DIV/0! #DIV/0! 46,200 #DIV/0! #DIV/0! 46,200 #DIV/0!
#DIV/0! #DIV/0! 16,100 #DIV/0! #DIV/0! 16,100 #DIV/0!
#DIV/0! #DIV/0! 28,750 #DIV/0! #DIV/0! 28,750 #DIV/0!
#DIV/0! #DIV/0! 112,125 #DIV/0! #DIV/0! 112,125 #DIV/0!
#DIV/0! #DIV/0! 123,625 #DIV/0! #DIV/0! 123,625 #DIV/0!
#DIV/0! #DIV/0! 44,275 #DIV/0! #DIV/0! 44,275 #DIV/0!
#DIV/0! #DIV/0! 57,692 #DIV/0! #DIV/0! 57,692 #DIV/0!
#DIV/0! #DIV/0! 69,000 #DIV/0! #DIV/0! 69,000 #DIV/0!
#DIV/0! #DIV/0! 88,167 #DIV/0! #DIV/0! 88,167 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 161,000 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 66,700 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 78,775 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 1,438 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 92,000 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 97,750 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 94,875 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 31,050 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 33,350 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 78,850 78,850 78,850 78,850 71,600
#DIV/0! #DIV/0! 109,050 #DIV/0! #DIV/0! 109,050 #DIV/0!
#DIV/0! #DIV/0! 115,350 #DIV/0! #DIV/0! 115,350 #DIV/0!
#DIV/0! #DIV/0! 102,650 102,650 102,650 102,650 93,300
#DIV/0! #DIV/0! 77,050 109,250 109,250 109,250 #DIV/0!
#DIV/0! #DIV/0! 38,500 38,500 38,500 38,500 35,000
#DIV/0! #DIV/0! 192,450 192,450 192,450 192,450 174,900
#DIV/0! #DIV/0! 102,650 102,650 102,650 102,650 93,300
#DIV/0! #DIV/0! 192,450 192,450 192,450 192,450 174,900
#DIV/0! #DIV/0! 122,000 122,000 122,000 122,000 110,900
#DIV/0! #DIV/0! 122,000 122,000 122,000 122,000 110,900
#DIV/0! #DIV/0! 147,600 147,600 147,600 147,600 134,100
#DIV/0! #DIV/0! 21,500 21,500 21,500 21,500 19,500
#DIV/0! #DIV/0! 21,500 21,500 21,500 21,500 19,500
#DIV/0! #DIV/0! 59,700 59,700 59,700 59,700 54,200
#DIV/0! #DIV/0! 61,950 61,950 61,950 61,950 56,300
#DIV/0! #DIV/0! 74,000 74,000 74,000 74,000 67,200
#DIV/0! #DIV/0! 85,950 85,950 85,950 85,950 78,100
#DIV/0! #DIV/0! 85,950 85,950 85,950 85,950 78,100
#DIV/0! #DIV/0! 53,950 53,950 53,950 53,950 49,000
#DIV/0! #DIV/0! 53,950 53,950 53,950 53,950 49,000
#DIV/0! #DIV/0! 63,000 63,000 63,000 63,000 57,200
#DIV/0! #DIV/0! 63,000 63,000 63,000 63,000 57,200
#DIV/0! #DIV/0! 43,050 43,050 43,050 43,050 39,100
#DIV/0! #DIV/0! 46,600 46,600 46,600 46,600 42,300
#DIV/0! #DIV/0! 60,900 60,900 60,900 60,900 55,300
#DIV/0! #DIV/0! 43,050 43,050 43,050 43,050 39,100
#DIV/0! #DIV/0! 50,150 50,150 50,150 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 50,150 50,150 50,150 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 72,450 #DIV/0!
#DIV/0! #DIV/0! 67,050 #DIV/0! #DIV/0! 67,050 #DIV/0!
#DIV/0! #DIV/0! 61,500 #DIV/0! #DIV/0! 61,500 #DIV/0!
#DIV/0! #DIV/0! 53,000 #DIV/0! #DIV/0! 53,000 #DIV/0!
#DIV/0! #DIV/0! 60,000 #DIV/0! #DIV/0! 60,000 #DIV/0!
#DIV/0! #DIV/0! 54,000 #DIV/0! #DIV/0! 54,000 #DIV/0!
#DIV/0! #DIV/0! 49,000 #DIV/0! #DIV/0! 49,000 #DIV/0!
#DIV/0! #DIV/0! 47,000 #DIV/0! #DIV/0! 47,000 #DIV/0!
#DIV/0! #DIV/0! 56,800 #DIV/0! #DIV/0! 56,800 #DIV/0!
#DIV/0! #DIV/0! 52,350 #DIV/0! #DIV/0! 52,350 #DIV/0!
#DIV/0! #DIV/0! 39,350 39,350 39,350 39,350 35,700
#DIV/0! #DIV/0! 15,850 15,850 15,850 15,850 14,400
#DIV/0! #DIV/0! 18,050 18,050 18,050 18,050 16,400
#DIV/0! #DIV/0! 15,850 15,850 15,850 15,850 14,400
#DIV/0! #DIV/0! 48,800 48,800 48,800 48,800 44,300
#DIV/0! #DIV/0! 57,300 57,300 57,300 57,300 52,000
#DIV/0! #DIV/0! 49,000 49,000 49,000 49,000 44,500
#DIV/0! #DIV/0! 46,700 46,700 46,700 46,700 42,400
#DIV/0! #DIV/0! 145,100 145,100 145,100 145,100 131,900
#DIV/0! #DIV/0! 132,150 #DIV/0! #DIV/0! 94,875 #DIV/0!
#DIV/0! #DIV/0! 239,050 #DIV/0! #DIV/0! 239,050 #DIV/0!
#DIV/0! #DIV/0! 262,350 #DIV/0! #DIV/0! 262,350 #DIV/0!
#DIV/0! #DIV/0! 139,850 139,850 139,850 139,850 127,100
#DIV/0! #DIV/0! 139,850 139,850 139,850 139,850 127,100
#DIV/0! #DIV/0! 70,200 #DIV/0! #DIV/0! 20,125 #DIV/0!
#DIV/0! #DIV/0! 63,000 63,000 63,000 63,000 57,200
#DIV/0! #DIV/0! 204,750 204,750 204,750 204,750 186,100
#DIV/0! #DIV/0! 147,800 #DIV/0! #DIV/0! 147,800 #DIV/0!
#DIV/0! #DIV/0! 420,000 420,000 420,000 420,000 381,800
#DIV/0! #DIV/0! 446,250 446,250 446,250 446,250 405,600
#DIV/0! #DIV/0! 446,250 #DIV/0! #DIV/0! 670,450 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 45,000 #DIV/0! #DIV/0! 45,000 #DIV/0!
#DIV/0! #DIV/0! 49,600 #DIV/0! #DIV/0! 49,600 #DIV/0!
#DIV/0! #DIV/0! 51,600 #DIV/0! #DIV/0! 51,600 #DIV/0!
#DIV/0! #DIV/0! 53,700 #DIV/0! #DIV/0! 53,700 #DIV/0!
#DIV/0! #DIV/0! 57,200 #DIV/0! #DIV/0! 57,200 #DIV/0!
#DIV/0! #DIV/0! 60,000 #DIV/0! #DIV/0! 60,000 #DIV/0!
#DIV/0! #DIV/0! 69,750 #DIV/0! #DIV/0! 69,750 #DIV/0!
#DIV/0! #DIV/0! 73,200 #DIV/0! #DIV/0! 73,200 #DIV/0!
#DIV/0! #DIV/0! - - -
#DIV/0! #DIV/0! - - -
#DIV/0! #DIV/0! 4,000 #DIV/0! #DIV/0! 4,000 #DIV/0!
#DIV/0! #DIV/0! 4,150 #DIV/0! #DIV/0! 4,150 #DIV/0!
#DIV/0! #DIV/0! 4,300 #DIV/0! #DIV/0! 4,300 #DIV/0!
#DIV/0! #DIV/0! 4,500 #DIV/0! #DIV/0! 4,500 #DIV/0!
#DIV/0! #DIV/0! 4,600 #DIV/0! #DIV/0! 4,600 #DIV/0!
#DIV/0! #DIV/0! 21,200 #DIV/0! #DIV/0! 21,200 #DIV/0!
#DIV/0! #DIV/0! 22,700 #DIV/0! #DIV/0! 22,700 #DIV/0!
#DIV/0! #DIV/0! 24,200 #DIV/0! #DIV/0! 24,200 #DIV/0!
#DIV/0! #DIV/0! 18,500 #DIV/0! #DIV/0! 18,500 #DIV/0!
#DIV/0! #DIV/0! 19,600 #DIV/0! #DIV/0! 19,600 #DIV/0!
#DIV/0! #DIV/0! 20,700 #DIV/0! #DIV/0! 20,700 #DIV/0!
#DIV/0! #DIV/0! 322,000 #DIV/0! #DIV/0! 322,000 #DIV/0!
#DIV/0! #DIV/0! 8,000 #DIV/0! #DIV/0! 8,000 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 38,600 #DIV/0! #DIV/0! 38,600 #DIV/0!
#DIV/0! #DIV/0! 645,500 #DIV/0! #DIV/0! 645,500 #DIV/0!
#DIV/0! #DIV/0! 352,650 #DIV/0! 275,000 275,000 #DIV/0!
#DIV/0! #DIV/0! 262,350 #DIV/0! 225,000 225,000 #DIV/0!
#DIV/0! #DIV/0! 158,550 158,550 158,550 158,550 144,100
#DIV/0! #DIV/0! 7,850 #DIV/0! #DIV/0! 11,500 #DIV/0!
#DIV/0! #DIV/0! 85,450 85,450 85,450 85,450 77,600
#DIV/0! #DIV/0! 106,750 106,750 106,750 106,750 97,000
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 181,850 200,000 200,000 200,000 #DIV/0!
#DIV/0! #DIV/0! 805,950 805,950 805,950 805,950 732,600
#DIV/0! #DIV/0! 1,147,400 #DIV/0! #DIV/0! 1,147,400 #DIV/0!
#DIV/0! #DIV/0! 122,000 #DIV/0! #DIV/0! 178,250 #DIV/0!
#DIV/0! #DIV/0! 150,650 180,000 180,000 180,000 #DIV/0!
#DIV/0! #DIV/0! 116,550 116,550 116,550 116,550 105,900
#DIV/0! #DIV/0! 74,850 74,850 74,850 74,850 68,000
#DIV/0! #DIV/0! 21,500 #DIV/0! #DIV/0! 21,500 #DIV/0!
#DIV/0! #DIV/0! 71,600 #DIV/0! #DIV/0! 71,600 #DIV/0!
#DIV/0! #DIV/0! 2,700 #DIV/0! #DIV/0! 2,700 #DIV/0!
#DIV/0! #DIV/0! 1,725,000 #DIV/0! #DIV/0! 1,725,000 #DIV/0!
#DIV/0! #DIV/0! 502,000 502,000 502,000 502,000 #DIV/0!
#DIV/0! #DIV/0! 425,000 #DIV/0! #DIV/0! 425,000 #DIV/0!
#DIV/0! #DIV/0! 52,350 65,000 65,000 65,000 #DIV/0!
#DIV/0! #DIV/0! 291,450 #DIV/0! #DIV/0! 291,450 #DIV/0!
#DIV/0! #DIV/0! 1,575,000 1,575,000 1,575,000 1,575,000 1,431,800
#DIV/0! #DIV/0! 984,350 984,350 984,350 984,350 894,800
#DIV/0! #DIV/0! 2,415,000 #DIV/0! #DIV/0! 2,415,000 #DIV/0!
#DIV/0! #DIV/0! 8,970,000 #DIV/0! #DIV/0! 8,970,000 #DIV/0!
#DIV/0! #DIV/0! 85,000 85,000 85,000 85,000 74,500
-
#DIV/0! #DIV/0! 500 #DIV/0! #DIV/0! 500 #DIV/0!
#DIV/0! #DIV/0! 900 #DIV/0! #DIV/0! 900 #DIV/0!
#DIV/0! #DIV/0! 23,700 #DIV/0! #DIV/0! 23,700 #DIV/0!
#DIV/0! #DIV/0! 18,650 #DIV/0! #DIV/0! 18,650 13,000
#DIV/0! #DIV/0! 25,900 #DIV/0! #DIV/0! 25,900 #DIV/0!
#DIV/0! #DIV/0! 13,000 13,000 13,000 13,000 11,800
#DIV/0! #DIV/0! 21,200 21,200 21,200 21,200 19,200
#DIV/0! #DIV/0! 22,350 22,350 22,350 22,350 20,300
#DIV/0! #DIV/0! 25,050 #DIV/0! #DIV/0! 25,050 #DIV/0!
#DIV/0! #DIV/0! 12,900 #DIV/0! #DIV/0! 12,900 #DIV/0!
#DIV/0! #DIV/0! 23,100 #DIV/0! #DIV/0! 23,100 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 14,000 #DIV/0! #DIV/0! 14,000 #DIV/0!
#DIV/0! #DIV/0! 8,500 #DIV/0! #DIV/0! 8,500 #DIV/0!
#DIV/0! #DIV/0! 1,050 #DIV/0! #DIV/0! 1,050 #DIV/0!
#DIV/0! #DIV/0! 33,600 #DIV/0! #DIV/0! 33,600 #DIV/0!
#DIV/0! #DIV/0! 14,000 #DIV/0! #DIV/0! 14,000 12,300
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 3,090,150 #DIV/0! #DIV/0! 3,090,150 2,687,000
#DIV/0! #DIV/0! 8,162,450 8,162,450 8,162,450 8,162,450 7,420,400
#DIV/0! #DIV/0! 7,888,500 7,888,500 7,888,500 7,888,500 7,171,300
#DIV/0! #DIV/0! 7,854,600 7,854,600 7,854,600 7,854,600 7,140,500
#DIV/0! #DIV/0! 12,362,500 #DIV/0! #DIV/0! 12,362,500 #DIV/0!
#DIV/0! #DIV/0! 13,225,000 #DIV/0! #DIV/0! 13,225,000 #DIV/0!
#DIV/0! #DIV/0! 11,500,000 #DIV/0! #DIV/0! 11,500,000 #DIV/0!
#DIV/0! #DIV/0! 19,001,200 #DIV/0! #DIV/0! 23,000,000 #DIV/0!
#DIV/0! #DIV/0! 18,174,450 #DIV/0! #DIV/0! 24,150,000 #DIV/0!
#DIV/0! #DIV/0! 16,985,000 16,985,000 16,985,000 16,985,000 15,440,900
#DIV/0! #DIV/0! 14,044,150 #DIV/0! #DIV/0! 18,400,000 #DIV/0!
#DIV/0! #DIV/0! 8,978,750 #DIV/0! #DIV/0! 9,717,500 #DIV/0!
#DIV/0! #DIV/0! 8,978,750 8,978,750 8,978,750 8,978,750 8,162,500
#DIV/0! #DIV/0! 8,978,750 8,978,750 8,978,750 8,978,750 8,162,500
#DIV/0! #DIV/0! 5,130,700 5,130,700 5,130,700 5,130,700 4,664,200
#DIV/0! #DIV/0! 5,772,050 5,772,050 5,772,050 5,772,050 5,247,300
#DIV/0! #DIV/0! 5,772,050 #DIV/0! #DIV/0! 5,772,050 #DIV/0!
#DIV/0! #DIV/0! 5,130,700 #DIV/0! #DIV/0! 5,130,700 #DIV/0!
#DIV/0! #DIV/0! 9,299,500 #DIV/0! #DIV/0! 9,299,500 #DIV/0!
#DIV/0! #DIV/0! 9,620,100 #DIV/0! #DIV/0! 9,620,100 #DIV/0!
#DIV/0! #DIV/0! 6,413,400 #DIV/0! #DIV/0! 6,413,400 #DIV/0!
#DIV/0! #DIV/0! 6,413,400 6,413,400 6,413,400 6,413,400 5,830,300
#DIV/0! #DIV/0! 6,413,400 6,413,400 6,413,400 6,413,400 5,830,300
#DIV/0! #DIV/0! 4,489,350 4,489,350 4,489,350 4,489,350 4,081,200
#DIV/0! #DIV/0! 4,810,050 4,810,050 4,810,050 4,810,050 4,372,700
#DIV/0! #DIV/0! 4,810,050 #DIV/0! #DIV/0! 4,810,050 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 4,489,350 4,489,350 4,489,350 4,489,350 4,081,200
#DIV/0! #DIV/0! 6,734,050 6,734,050 6,734,050 6,734,050 6,121,800
#DIV/0! #DIV/0! 7,054,800 7,054,800 7,054,800 7,054,800 6,413,400
#DIV/0! #DIV/0! 2,308,800 2,308,800 2,308,800 2,308,800 2,098,900
#DIV/0! #DIV/0! 2,308,800 2,308,800 2,308,800 2,308,800 2,098,900
#DIV/0! #DIV/0! 1,924,000 1,924,000 1,924,000 1,924,000 1,749,000
#DIV/0! #DIV/0! 3,848,100 3,848,100 3,848,100 3,848,100 3,498,200

#DIV/0! #DIV/0! 5,451,350 #DIV/0! #DIV/0! 5,451,350 #DIV/0!


#DIV/0! #DIV/0! 5,451,350 5,451,350 5,451,350 5,451,350 4,955,700
#DIV/0! #DIV/0! 5,451,350 5,451,350 5,451,350 5,451,350 4,955,700
#DIV/0! #DIV/0! 3,848,100 3,848,100 3,848,100 3,848,100 3,498,200
#DIV/0! #DIV/0! 4,168,700 4,168,700 4,168,700 4,168,700 3,789,700
#DIV/0! #DIV/0! 4,168,700 #DIV/0! #DIV/0! 4,168,700 #DIV/0!
#DIV/0! #DIV/0! 3,848,100 #DIV/0! #DIV/0! 3,848,100 #DIV/0!
#DIV/0! #DIV/0! 5,772,050 #DIV/0! #DIV/0! 5,772,050 #DIV/0!
#DIV/0! #DIV/0! 6,092,800 #DIV/0! #DIV/0! 6,092,800 #DIV/0!
#DIV/0! #DIV/0! 6,023,850 6,023,850 6,023,850 6,023,850 5,476,200
#DIV/0! #DIV/0! 12,900 12,900 12,900 12,900 11,700
#DIV/0! #DIV/0! 8,925,000 8,925,000 8,925,000 8,925,000 8,113,600
#DIV/0! #DIV/0! 8,925,000 8,925,000 8,925,000 8,925,000 8,113,600
#DIV/0! #DIV/0! 9,344,450 9,344,450 9,344,450 9,344,450 8,494,900
#DIV/0! #DIV/0! 9,652,800 9,652,800 9,652,800 9,652,800 8,775,200
#DIV/0! #DIV/0! 17,000,000 #DIV/0! #DIV/0! 17,000,000 #DIV/0!
#DIV/0! #DIV/0! 17,500,000 #DIV/0! #DIV/0! 17,500,000 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 102,000 #DIV/0! #DIV/0! 80,500 #DIV/0!
#DIV/0! #DIV/0! 89,750 #DIV/0! 102,000 102,000 #DIV/0!
#DIV/0! #DIV/0! 7,550 #DIV/0! #DIV/0! 7,550 #DIV/0!
#DIV/0! #DIV/0! 66,000 66,000 66,000 66,000 60,000
#DIV/0! #DIV/0! 90,000 #DIV/0! #DIV/0! 90,000 79,500
#DIV/0! #DIV/0! 75,050 102,500 102,500 102,500 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 223,000 223,000 223,000 223,000 202,700
#DIV/0! #DIV/0! 390,000 390,000 390,000 390,000 354,500
#DIV/0! #DIV/0! 390,000 390,000 390,000 390,000 354,500
#DIV/0! #DIV/0! 950,000 #DIV/0! #DIV/0! 950,000 #DIV/0!
#DIV/0! #DIV/0! 1,425,000 #DIV/0! #DIV/0! 1,425,000 #DIV/0!
#DIV/0! #DIV/0! 3,500,000 #DIV/0! #DIV/0! 3,500,000 #DIV/0!
#DIV/0! #DIV/0! 332,000 332,000 332,000 332,000 301,800
#DIV/0! #DIV/0! 372,000 372,000 372,000 372,000 338,100
#DIV/0! #DIV/0! 497,500 497,500 497,500 497,500 452,200
#DIV/0! #DIV/0! 637,000 #DIV/0! #DIV/0! 637,000 #DIV/0!
#DIV/0! #DIV/0! 1,550,000 #DIV/0! #DIV/0! 1,550,000 #DIV/0!
#DIV/0! #DIV/0! 3,500,000 #DIV/0! #DIV/0! 3,500,000 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! -
#DIV/0! #DIV/0! 162,000 162,000 162,000 162,000 147,200
#DIV/0! #DIV/0! 228,450 228,450 228,450 228,450 207,600
#DIV/0! #DIV/0! 320,000 320,000 320,000 320,000 290,900
#DIV/0! #DIV/0! 478,250 478,250 478,250 478,250 434,700
#DIV/0! #DIV/0! 995,800 995,800 995,800 995,800 905,200
#DIV/0! #DIV/0! 1,621,400 1,621,400 1,621,400 1,621,400 1,474,000
#DIV/0! #DIV/0! 2,514,100 2,514,100 2,514,100 2,514,100 2,285,500
#DIV/0! #DIV/0! 3,984,100 3,984,100 3,984,100 3,984,100 3,621,900
#DIV/0! #DIV/0! 5,136,800 5,136,800 5,136,800 5,136,800 4,669,800
#DIV/0! #DIV/0! 6,523,850 6,523,850 6,523,850 6,523,850 5,930,700
#DIV/0! #DIV/0! 39,750 39,750 39,750 39,750 36,100
#DIV/0! #DIV/0! 59,000 59,000 59,000 59,000 53,600
#DIV/0! #DIV/0! 95,650 95,650 95,650 95,650 86,900
#DIV/0! #DIV/0! 156,750 156,750 156,750 156,750 142,500
#DIV/0! #DIV/0! 222,150 222,150 222,150 222,150 201,900
#DIV/0! #DIV/0! 320,450 320,450 320,450 320,450 291,300
#DIV/0! #DIV/0! 482,450 482,450 482,450 482,450 438,500
#DIV/0! #DIV/0! 1,020,800 1,020,800 1,020,800 1,020,800 928,000
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 1,665,050 1,665,050 1,665,050 1,665,050 1,513,600
#DIV/0! #DIV/0! 2,992,250 2,992,250 2,992,250 2,992,250 2,720,200
#DIV/0! #DIV/0! 4,764,900 4,764,900 4,764,900 4,764,900 4,331,700
#DIV/0! #DIV/0! 133,650 133,650 133,650 133,650 121,500
#DIV/0! #DIV/0! 189,300 189,300 189,300 189,300 172,000
#DIV/0! #DIV/0! 265,400 265,400 265,400 265,400 241,200
#DIV/0! #DIV/0! 389,200 389,200 389,200 389,200 353,800
#DIV/0! #DIV/0! 816,650 816,650 816,650 816,650 742,400
#DIV/0! #DIV/0! 1,321,000 1,321,000 1,321,000 1,321,000 1,200,900
#DIV/0! #DIV/0! 2,059,350 2,059,350 2,059,350 2,059,350 1,872,100
#DIV/0! #DIV/0! 3,259,700 3,259,700 3,259,700 3,259,700 2,963,300
#DIV/0! #DIV/0! 4,227,900 4,227,900 4,227,900 4,227,900 3,843,500
#DIV/0! #DIV/0! 5,339,950 5,339,950 5,339,950 5,339,950 4,854,500
#DIV/0! #DIV/0! 24,550 24,550 24,550 24,550 22,300
#DIV/0! #DIV/0! 38,850 38,850 38,850 38,850 35,300
#DIV/0! #DIV/0! 44,100 44,100 44,100 44,100 40,000
#DIV/0! #DIV/0! 88,300 88,300 88,300 88,300 80,200
#DIV/0! #DIV/0! 119,450 119,450 119,450 119,450 108,500
#DIV/0! #DIV/0! 171,450 171,450 171,450 171,450 155,800
#DIV/0! #DIV/0! 248,300 248,300 248,300 248,300 225,700
#DIV/0! #DIV/0! 366,950 366,950 366,950 366,950 333,500
#DIV/0! #DIV/0! 785,150 785,150 785,150 785,150 713,700
#DIV/0! #DIV/0! 1,272,700 1,272,700 1,272,700 1,272,700 1,157,000
#DIV/0! #DIV/0! 1,994,750 1,994,750 1,994,750 1,994,750 1,813,400
#DIV/0! #DIV/0! 3,176,550 3,176,550 3,176,550 3,176,550 2,887,700
#DIV/0! #DIV/0! 159,150 159,150 159,150 159,150 144,600
#DIV/0! #DIV/0! 223,300 223,300 223,300 223,300 203,000
#DIV/0! #DIV/0! 315,200 315,200 315,200 315,200 286,500
#DIV/0! #DIV/0! 465,950 465,950 465,950 465,950 423,500
#DIV/0! #DIV/0! 968,500 968,500 968,500 968,500 880,400
#DIV/0! #DIV/0! 1,613,700 1,613,700 1,613,700 1,613,700 1,467,000
#DIV/0! #DIV/0! 2,501,100 2,501,100 2,501,100 2,501,100 2,273,700
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 3,165,300 3,165,300 3,165,300 3,165,300 2,877,500
#DIV/0! #DIV/0! 3,959,550 3,959,550 3,959,550 3,959,550 3,599,500
#DIV/0! #DIV/0! 5,670,100 5,670,100 5,670,100 5,670,100 5,154,600
#DIV/0! #DIV/0! 7,195,500 7,195,500 7,195,500 7,195,500 6,541,300
#DIV/0! #DIV/0! 23,100 23,100 23,100 23,100 21,000
#DIV/0! #DIV/0! 39,650 39,650 39,650 39,650 36,000
#DIV/0! #DIV/0! 59,000 59,000 59,000 59,000 53,600
#DIV/0! #DIV/0! 93,000 93,000 93,000 93,000 84,500
#DIV/0! #DIV/0! 142,800 142,800 142,800 142,800 129,800
#DIV/0! #DIV/0! 202,950 202,950 202,950 202,950 184,500
#DIV/0! #DIV/0! 292,300 292,300 292,300 292,300 265,700
#DIV/0! #DIV/0! 440,350 440,350 440,350 440,350 400,300
#DIV/0! #DIV/0! 932,150 932,150 932,150 932,150 847,400
#DIV/0! #DIV/0! 1,556,600 1,556,600 1,556,600 1,556,600 1,415,000
#DIV/0! #DIV/0! 2,424,850 2,424,850 2,424,850 2,424,850 2,204,400
#DIV/0! #DIV/0! 3,067,650 3,067,650 3,067,650 3,067,650 2,788,700
#DIV/0! #DIV/0! 3,861,750 3,861,750 3,861,750 3,861,750 3,510,600
#DIV/0! #DIV/0! 131,750 131,750 131,750 131,750 119,700
#DIV/0! #DIV/0! 185,950 185,950 185,950 185,950 169,000
#DIV/0! #DIV/0! 262,350 262,350 262,350 262,350 238,500
#DIV/0! #DIV/0! 380,300 380,300 380,300 380,300 345,700
#DIV/0! #DIV/0! 796,000 796,000 796,000 796,000 723,600
#DIV/0! #DIV/0! 1,316,550 1,316,550 1,316,550 1,316,550 1,196,800
#DIV/0! #DIV/0! 2,051,800 2,051,800 2,051,800 2,051,800 1,865,200
#DIV/0! #DIV/0! 2,572,500 2,572,500 2,572,500 2,572,500 2,338,600
#DIV/0! #DIV/0! 3,243,450 3,243,450 3,243,450 3,243,450 2,948,500
#DIV/0! #DIV/0! 4,204,500 4,204,500 4,204,500 4,204,500 3,822,200
#DIV/0! #DIV/0! 5,894,800 5,894,800 5,894,800 5,894,800 5,358,900
#DIV/0! #DIV/0! 14,250 14,250 14,250 14,250 12,900
#DIV/0! #DIV/0! 21,500 21,500 21,500 21,500 19,500
#DIV/0! #DIV/0! 34,100 34,100 34,100 34,100 31,000
#DIV/0! #DIV/0! 52,350 52,350 52,350 52,350 47,500
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 80,200 80,200 80,200 80,200 72,900
#DIV/0! #DIV/0! 115,700 115,700 115,700 115,700 105,100
#DIV/0! #DIV/0! 537,600 537,600 537,600 537,600 488,700
#DIV/0! #DIV/0! 240,200 240,200 240,200 240,200 218,300
#DIV/0! #DIV/0! 355,500 355,500 355,500 355,500 323,100
#DIV/0! #DIV/0! 760,700 760,700 760,700 760,700 691,500
#DIV/0! #DIV/0! 1,261,650 1,261,650 1,261,650 1,261,650 1,146,900
#DIV/0! #DIV/0! 1,978,200 1,978,200 1,978,200 1,978,200 1,798,300
#DIV/0! #DIV/0! 2,478,300 2,478,300 2,478,300 2,478,300 2,253,000
#DIV/0! #DIV/0! 3,148,600 3,148,600 3,148,600 3,148,600 2,862,300
#DIV/0! #DIV/0! 141,400 141,400 141,400 141,400 128,500
#DIV/0! #DIV/0! 198,450 198,450 198,450 198,450 180,400
#DIV/0! #DIV/0! 277,700 277,700 277,700 277,700 252,400
#DIV/0! #DIV/0! 416,000 416,000 416,000 416,000 378,100
#DIV/0! #DIV/0! 862,950 862,950 862,950 862,950 784,500
#DIV/0! #DIV/0! 1,404,050 1,404,050 1,404,050 1,404,050 1,276,400
#DIV/0! #DIV/0! 2,176,400 2,176,400 2,176,400 2,176,400 1,978,500
#DIV/0! #DIV/0! 3,446,600 3,446,600 3,446,600 3,446,600 3,133,200
#DIV/0! #DIV/0! 4,436,550 4,436,550 4,436,550 4,436,550 4,033,200
#DIV/0! #DIV/0! 5,639,300 5,639,300 5,639,300 5,639,300 5,126,600
#DIV/0! #DIV/0! 13,850 13,850 13,850 13,850 12,500
#DIV/0! #DIV/0! 20,550 20,550 20,550 20,550 18,600
#DIV/0! #DIV/0! 35,350 35,350 35,350 35,350 32,100
#DIV/0! #DIV/0! 52,700 52,700 52,700 52,700 47,900
#DIV/0! #DIV/0! 82,950 82,950 82,950 82,950 75,400
#DIV/0! #DIV/0! 127,850 127,850 127,850 127,850 116,200
#DIV/0! #DIV/0! 181,200 181,200 181,200 181,200 164,700
#DIV/0! #DIV/0! 260,900 260,900 260,900 260,900 237,100
#DIV/0! #DIV/0! 393,000 393,000 393,000 393,000 357,200
#DIV/0! #DIV/0! 831,800 831,800 831,800 831,800 756,100
#DIV/0! #DIV/0! 1,356,350 1,356,350 1,356,350 1,356,350 1,233,000
#DIV/0! #DIV/0! 2,112,600 2,112,600 2,112,600 2,112,600 1,920,500
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 3,364,800 3,364,800 3,364,800 3,364,800 3,058,900
#DIV/0! #DIV/0! 122,600 122,600 122,600 122,600 111,400
#DIV/0! #DIV/0! 173,450 173,450 173,450 173,450 157,600
#DIV/0! #DIV/0! 242,400 242,400 242,400 242,400 220,300
#DIV/0! #DIV/0! 355,300 355,300 355,300 355,300 323,000
#DIV/0! #DIV/0! 744,000 744,000 744,000 744,000 676,300
#DIV/0! #DIV/0! 1,202,350 1,202,350 1,202,350 1,202,350 1,093,000
#DIV/0! #DIV/0! 1,874,100 1,874,100 1,874,100 1,874,100 1,703,700
#DIV/0! #DIV/0! 2,963,300 2,963,300 2,963,300 2,963,300 2,693,900
#DIV/0! #DIV/0! 3,842,050 3,842,050 3,842,050 3,842,050 3,492,700
#DIV/0! #DIV/0! 4,849,400 4,849,400 4,849,400 4,849,400 4,408,500
#DIV/0! #DIV/0! 13,500 13,500 13,500 13,500 12,200
#DIV/0! #DIV/0! 20,250 20,250 20,250 20,250 18,400
#DIV/0! #DIV/0! 31,900 31,900 31,900 31,900 29,000
#DIV/0! #DIV/0! 49,200 49,200 49,200 49,200 44,700
#DIV/0! #DIV/0! 75,150 75,150 75,150 75,150 68,300
#DIV/0! #DIV/0! 108,350 108,350 108,350 108,350 98,500
#DIV/0! #DIV/0! 155,500 155,500 155,500 155,500 141,300
#DIV/0! #DIV/0! 225,100 225,100 225,100 225,100 204,600
#DIV/0! #DIV/0! 333,050 333,050 333,050 333,050 302,700
#DIV/0! #DIV/0! 712,600 712,600 712,600 712,600 647,800
#DIV/0! #DIV/0! 1,154,150 1,154,150 1,154,150 1,154,150 1,049,200
#DIV/0! #DIV/0! 1,809,450 1,809,450 1,809,450 1,809,450 1,644,900
#DIV/0! #DIV/0! 2,880,350 2,880,350 2,880,350 2,880,350 2,618,500
#DIV/0! #DIV/0! 131,250 #DIV/0! #DIV/0! 131,250 #DIV/0!
#DIV/0! #DIV/0! 148,750 148,750 148,750 148,750 135,200
#DIV/0! #DIV/0! 166,300 166,300 166,300 166,300 151,100
#DIV/0! #DIV/0! 192,450 192,450 192,450 192,450 174,900
#DIV/0! #DIV/0! 157,350 #DIV/0! #DIV/0! 157,350 #DIV/0!
#DIV/0! #DIV/0! 192,450 192,450 192,450 192,450 174,900
#DIV/0! #DIV/0! 209,850 209,850 209,850 209,850 190,700
#DIV/0! #DIV/0! 244,850 244,850 244,850 244,850 222,500
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 236,250 #DIV/0! #DIV/0! 236,250 #DIV/0!
#DIV/0! #DIV/0! 262,350 262,350 262,350 262,350 238,500
#DIV/0! #DIV/0! 297,350 297,350 297,350 297,350 270,300
#DIV/0! #DIV/0! 323,700 323,700 323,700 323,700 294,200
#DIV/0! #DIV/0! 367,250 367,250 367,250 367,250 333,800
#DIV/0! #DIV/0! 330,600 #DIV/0! #DIV/0! 330,600 #DIV/0!
#DIV/0! #DIV/0! 367,250 367,250 367,250 367,250 333,800
#DIV/0! #DIV/0! 528,150 528,150 528,150 528,150 480,100
#DIV/0! #DIV/0! 349,850 #DIV/0! #DIV/0! 349,850 #DIV/0!
#DIV/0! #DIV/0! 384,800 384,800 384,800 384,800 349,800
#DIV/0! #DIV/0! 446,000 446,000 446,000 446,000 405,400
#DIV/0! #DIV/0! 481,100 481,100 481,100 481,100 437,300
#DIV/0! #DIV/0! 542,200 542,200 542,200 542,200 492,900
#DIV/0! #DIV/0! 437,200 #DIV/0! #DIV/0! 437,200 #DIV/0!
#DIV/0! #DIV/0! 489,700 489,700 489,700 489,700 445,100
#DIV/0! #DIV/0! 551,000 551,000 551,000 551,000 500,900
#DIV/0! #DIV/0! 603,500 603,500 603,500 603,500 548,600
#DIV/0! #DIV/0! 673,450 673,450 673,450 673,450 612,200
#DIV/0! #DIV/0! 708,400 #DIV/0! #DIV/0! 708,400 #DIV/0!
#DIV/0! #DIV/0! 769,500 769,500 769,500 769,500 699,500
#DIV/0! #DIV/0! 857,000 857,000 857,000 857,000 779,000
#DIV/0! #DIV/0! 883,250 883,250 883,250 883,250 802,900
#DIV/0! #DIV/0! 717,150 #DIV/0! #DIV/0! 717,150 #DIV/0!
#DIV/0! #DIV/0! 813,300 813,300 813,300 813,300 739,300
#DIV/0! #DIV/0! 874,500 874,500 874,500 874,500 795,000
#DIV/0! #DIV/0! 979,500 979,500 979,500 979,500 890,400
#DIV/0! #DIV/0! 1,049,450 1,049,450 1,049,450 1,049,450 954,000
#DIV/0! #DIV/0! 1,049,450 #DIV/0! #DIV/0! 1,049,450 #DIV/0!
#DIV/0! #DIV/0! 1,145,650 1,145,650 1,145,650 1,145,650 1,041,500
#DIV/0! #DIV/0! 1,285,600 1,285,600 1,285,600 1,285,600 1,168,700
#DIV/0! #DIV/0! 1,373,050 1,373,050 1,373,050 1,373,050 1,248,200
#DIV/0! #DIV/0! 1,512,900 1,512,900 1,512,900 1,512,900 1,375,300
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 1,670,550 #DIV/0! #DIV/0! 1,670,550 #DIV/0!
#DIV/0! #DIV/0! 1,871,500 1,871,500 1,871,500 1,871,500 1,701,300
#DIV/0! #DIV/0! 2,002,750 2,002,750 2,002,750 2,002,750 1,820,600
#DIV/0! #DIV/0! 2,203,800 2,203,800 2,203,800 2,203,800 2,003,400
#DIV/0! #DIV/0! 2,335,050 2,335,050 2,335,050 2,335,050 2,122,700
#DIV/0! #DIV/0! 4,897,500 #DIV/0! #DIV/0! 4,897,500 #DIV/0!
#DIV/0! #DIV/0! 6,646,600 #DIV/0! #DIV/0! 6,646,600 #DIV/0!
#DIV/0! #DIV/0! 8,955,450 #DIV/0! #DIV/0! 8,955,450 #DIV/0!
#DIV/0! #DIV/0! 10,039,950 #DIV/0! #DIV/0! 10,039,950 #DIV/0!
-
#DIV/0! #DIV/0! 21,200 #DIV/0! #DIV/0! 21,200 18,200
#DIV/0! #DIV/0! 16,350 #DIV/0! #DIV/0! 16,350 #DIV/0!
#DIV/0! #DIV/0! 11,400 #DIV/0! #DIV/0! 11,400 9,800
#DIV/0! #DIV/0! 7,450 #DIV/0! #DIV/0! 7,450 #DIV/0!
#DIV/0! #DIV/0! 40,400 #DIV/0! #DIV/0! 40,400 #DIV/0!
#DIV/0! #DIV/0! 31,150 #DIV/0! #DIV/0! 31,150 #DIV/0!
#DIV/0! #DIV/0! 57,300 #DIV/0! #DIV/0! 57,300 49,750
#DIV/0! #DIV/0! 9,100 #DIV/0! #DIV/0! 9,100 #DIV/0!
#DIV/0! #DIV/0! 84,200 #DIV/0! #DIV/0! 84,200 72,750
#DIV/0! #DIV/0! 132,600 #DIV/0! #DIV/0! 132,600 #DIV/0!
#DIV/0! #DIV/0! 175,000 #DIV/0! #DIV/0! 175,000 #DIV/0!
#DIV/0! #DIV/0! 257,000 #DIV/0! #DIV/0! 257,000 #DIV/0!
#DIV/0! #DIV/0! 356,500 #DIV/0! #DIV/0! 356,500 #DIV/0!
#DIV/0! #DIV/0! 122,850 122,850 122,850 122,850 111,600
#DIV/0! #DIV/0! 3,550 3,550 3,550 3,550 3,200
#DIV/0! #DIV/0! 3,350 3,350 3,350 3,350 3,000
#DIV/0! #DIV/0! 2,900 2,900 2,900 2,900 2,600
#DIV/0! #DIV/0! 6,900 6,900 6,900 6,900 6,200
#DIV/0! #DIV/0! 4,700 4,700 4,700 4,700 4,200
#DIV/0! #DIV/0! 11,750 11,750 11,750 11,750 10,600
#DIV/0! #DIV/0! 2,200 2,200 2,200 2,200 2,000
#DIV/0! #DIV/0! 23,300 23,300 23,300 23,300 21,100
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 1,150 1,150 1,150 1,150 1,000
#DIV/0! #DIV/0! 21,900 21,900 21,900 21,900 19,900
#DIV/0! #DIV/0! 204,750 204,750 204,750 204,750 186,100
#DIV/0! #DIV/0! 217,750 217,750 217,750 217,750 197,900
#DIV/0! #DIV/0! 5,450 5,450 5,450 5,450 4,900
#DIV/0! #DIV/0! 3,950 3,950 3,950 3,950 3,500
#DIV/0! #DIV/0! 3,550 3,550 3,550 3,550 3,200
#DIV/0! #DIV/0! 15,300 15,300 15,300 15,300 13,900
#DIV/0! #DIV/0! 10,900 10,900 10,900 10,900 9,900
#DIV/0! #DIV/0! 26,250 26,250 26,250 26,250 23,800
#DIV/0! #DIV/0! 2,900 2,900 2,900 2,900 2,600
#DIV/0! #DIV/0! 48,800 48,800 48,800 48,800 44,300
#DIV/0! #DIV/0! 120,600 120,600 120,600 120,600 109,600
#DIV/0! #DIV/0! 205,550 205,550 205,550 205,550 186,800
#DIV/0! #DIV/0! 438,250 438,250 438,250 438,250 398,400
#DIV/0! #DIV/0! 1,550 1,550 1,550 1,550 1,400
#DIV/0! #DIV/0! 35,550 #DIV/0! #DIV/0! 35,550 #DIV/0!
#DIV/0! #DIV/0! 22,050 #DIV/0! #DIV/0! 22,050 #DIV/0!
#DIV/0! #DIV/0! 5,850 #DIV/0! #DIV/0! 5,850 #DIV/0!
#DIV/0! #DIV/0! 100,550 #DIV/0! #DIV/0! 100,550 #DIV/0!
#DIV/0! -
#DIV/0! #DIV/0! 3,850 3,850 3,850 3,850 3,500
#DIV/0! #DIV/0! 4,200 4,200 4,200 4,200 3,800
#DIV/0! #DIV/0! 4,600 4,600 4,600 4,600 4,100
#DIV/0! #DIV/0! 5,100 5,100 5,100 5,100 4,600
#DIV/0! #DIV/0! 8,050 8,050 8,050 8,050 7,300
#DIV/0! #DIV/0! 10,350 10,350 10,350 10,350 9,400
#DIV/0! #DIV/0! 185,400 185,400 185,400 185,400 168,500
#DIV/0! #DIV/0! 198,450 198,450 198,450 198,450 180,400
#DIV/0! #DIV/0! 266,700 266,700 266,700 266,700 242,400
#DIV/0! #DIV/0! 458,000 458,000 458,000 458,000 416,300
#DIV/0! #DIV/0! 571,500 571,500 571,500 571,500 519,500
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 1,063,950 1,063,950 1,063,950 1,063,950 967,200
#DIV/0! #DIV/0! 1,331,800 1,331,800 1,331,800 1,331,800 1,210,700
#DIV/0! #DIV/0! 1,603,850 1,603,850 1,603,850 1,603,850 1,458,000
#DIV/0! #DIV/0! 1,963,150 1,963,150 1,963,150 1,963,150 1,784,600
#DIV/0! #DIV/0! 183,750 183,750 183,750 183,750 167,000
#DIV/0! #DIV/0! 198,450 198,450 198,450 198,450 180,400
#DIV/0! #DIV/0! 289,050 289,050 289,050 289,050 262,700
#DIV/0! #DIV/0! 471,100 471,100 471,100 471,100 428,200
#DIV/0! #DIV/0! 637,650 637,650 637,650 637,650 579,600
#DIV/0! #DIV/0! 899,100 899,100 899,100 899,100 817,300
#DIV/0! #DIV/0! 1,165,350 1,165,350 1,165,350 1,165,350 1,059,400
#DIV/0! #DIV/0! 1,724,300 1,724,300 1,724,300 1,724,300 1,567,500
#DIV/0! #DIV/0! 2,368,550 2,368,550 2,368,550 2,368,550 2,153,200
#DIV/0! #DIV/0! 185,700 185,700 185,700 185,700 168,800
#DIV/0! #DIV/0! 246,400 246,400 246,400 246,400 224,000
#DIV/0! #DIV/0! 318,350 318,350 318,350 318,350 289,400
#DIV/0! #DIV/0! 530,550 530,550 530,550 530,550 482,300
#DIV/0! #DIV/0! 795,750 795,750 795,750 795,750 723,400
#DIV/0! #DIV/0! 928,500 928,500 928,500 928,500 844,000
#DIV/0! #DIV/0! 1,193,700 1,193,700 1,193,700 1,193,700 1,085,100
#DIV/0! #DIV/0! 1,752,650 1,752,650 1,752,650 1,752,650 1,593,300
#DIV/0! #DIV/0! 2,747,600 2,747,600 2,747,600 2,747,600 2,497,800
#DIV/0! #DIV/0! 198,950 198,950 198,950 198,950 180,800
#DIV/0! #DIV/0! 312,550 312,550 312,550 312,550 284,100
#DIV/0! #DIV/0! 369,450 369,450 369,450 369,450 335,800
#DIV/0! #DIV/0! 710,500 710,500 710,500 710,500 645,900
#DIV/0! #DIV/0! 843,250 843,250 843,250 843,250 766,500
#DIV/0! #DIV/0! 1,184,250 1,184,250 1,184,250 1,184,250 1,076,500
#DIV/0! #DIV/0! 2,084,450 2,084,450 2,084,450 2,084,450 1,894,900
#DIV/0! #DIV/0! 2,321,200 2,321,200 2,321,200 2,321,200 2,110,100
#DIV/0! #DIV/0! 2,558,000 2,558,000 2,558,000 2,558,000 2,325,400
#DIV/0! #DIV/0! 51,850 51,850 51,850 51,850 47,100
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 66,450 66,450 66,450 66,450 60,400
#DIV/0! #DIV/0! 82,400 82,400 82,400 82,400 74,900
#DIV/0! #DIV/0! 119,350 119,350 119,350 119,350 108,500
#DIV/0! #DIV/0! 230,850 230,850 230,850 230,850 209,800
#DIV/0! #DIV/0! 395,100 395,100 395,100 395,100 359,100
#DIV/0! #DIV/0! 704,200 704,200 704,200 704,200 640,100
#DIV/0! #DIV/0! 1,174,100 1,174,100 1,174,100 1,174,100 1,067,300
#DIV/0! #DIV/0! 3,286,800 3,286,800 3,286,800 3,286,800 2,988,000
#DIV/0! #DIV/0! 6,193,400 6,193,400 6,193,400 6,193,400 5,630,300
#DIV/0! #DIV/0! 54,350 54,350 54,350 54,350 49,400
#DIV/0! #DIV/0! 72,000 72,000 72,000 72,000 65,400
#DIV/0! #DIV/0! 89,000 89,000 89,000 89,000 80,900
#DIV/0! #DIV/0! 128,600 128,600 128,600 128,600 116,900
#DIV/0! #DIV/0! 259,850 259,850 259,850 259,850 236,200
#DIV/0! #DIV/0! 452,400 452,400 452,400 452,400 411,200
#DIV/0! #DIV/0! 834,400 834,400 834,400 834,400 758,500
#DIV/0! #DIV/0! 1,395,650 1,395,650 1,395,650 1,395,650 1,268,700
#DIV/0! #DIV/0! 3,286,800 3,286,800 3,286,800 3,286,800 2,988,000
#DIV/0! #DIV/0! 6,193,400 6,193,400 6,193,400 6,193,400 5,630,300
#DIV/0! #DIV/0! 62,150 62,150 62,150 62,150 56,500
#DIV/0! #DIV/0! 76,650 76,650 76,650 76,650 69,600
#DIV/0! #DIV/0! 101,000 101,000 101,000 101,000 91,800
#DIV/0! #DIV/0! 143,300 143,300 143,300 143,300 130,200
#DIV/0! #DIV/0! 305,100 305,100 305,100 305,100 277,300
#DIV/0! #DIV/0! 541,350 541,350 541,350 541,350 492,100
#DIV/0! #DIV/0! 1,014,800 1,014,800 1,014,800 1,014,800 922,500
#DIV/0! #DIV/0! 1,722,900 1,722,900 1,722,900 1,722,900 1,566,200
#DIV/0! #DIV/0! 3,667,000 3,667,000 3,667,000 3,667,000 3,333,600
#DIV/0! #DIV/0! 6,916,750 6,916,750 6,916,750 6,916,750 6,287,900
#DIV/0! #DIV/0! 67,700 67,700 67,700 67,700 61,500
#DIV/0! #DIV/0! 86,500 86,500 86,500 86,500 78,600
#DIV/0! #DIV/0! 114,200 114,200 114,200 114,200 103,800
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 164,400 164,400 164,400 164,400 149,400
#DIV/0! #DIV/0! 350,150 350,150 350,150 350,150 318,300
#DIV/0! #DIV/0! 631,450 631,450 631,450 631,450 574,000
#DIV/0! #DIV/0! 1,107,400 1,107,400 1,107,400 1,107,400 1,006,700
#DIV/0! #DIV/0! 1,919,150 1,919,150 1,919,150 1,919,150 1,744,600
#DIV/0! #DIV/0! 5,960,100 5,960,100 5,960,100 5,960,100 5,418,200
#DIV/0! #DIV/0! 8,915,750 8,915,750 8,915,750 8,915,750 8,105,200
#DIV/0! #DIV/0! 35,050 35,050 35,050 35,050 31,800
#DIV/0! #DIV/0! 349,850 349,850 349,850 349,850 318,000
#DIV/0! #DIV/0! 612,150 612,150 612,150 612,150 556,500
#DIV/0! #DIV/0! 699,600 699,600 699,600 699,600 636,000
#DIV/0! #DIV/0! 1,399,200 1,399,200 1,399,200 1,399,200 1,272,000
#DIV/0! #DIV/0! 2,186,300 2,186,300 2,186,300 2,186,300 1,987,500
#DIV/0! #DIV/0! 3,060,850 3,060,850 3,060,850 3,060,850 2,782,500
#DIV/0! #DIV/0! 4,810,050 4,810,050 4,810,050 4,810,050 4,372,700
#DIV/0! #DIV/0! 1,224,400 1,224,400 1,224,400 1,224,400 1,113,000
#DIV/0! #DIV/0! 1,924,000 1,924,000 1,924,000 1,924,000 1,749,000
#DIV/0! #DIV/0! 2,886,000 2,886,000 2,886,000 2,886,000 2,623,600
#DIV/0! #DIV/0! 4,810,050 4,810,050 4,810,050 4,810,050 4,372,700
#DIV/0! #DIV/0! 7,871,000 7,871,000 7,871,000 7,871,000 7,155,400
#DIV/0! #DIV/0! 9,007,800 9,007,800 9,007,800 9,007,800 8,188,900
#DIV/0! #DIV/0! 11,194,350 11,194,350 11,194,350 11,194,350 10,176,600
#DIV/0! #DIV/0! 28,860,300 28,860,300 28,860,300 28,860,300 26,236,600
#DIV/0! #DIV/0! 37,168,600 37,168,600 37,168,600 37,168,600 33,789,600
#DIV/0! #DIV/0! 19,950 19,950 19,950 19,950 18,100
#DIV/0! #DIV/0! 22,750 22,750 22,750 22,750 20,600
#DIV/0! #DIV/0! 25,500 25,500 25,500 25,500 23,100
#DIV/0! #DIV/0! 43,150 43,150 43,150 43,150 39,200
#DIV/0! #DIV/0! 46,200 46,200 46,200 46,200 42,000
#DIV/0! #DIV/0! 107,800 107,800 107,800 107,800 98,000
#DIV/0! #DIV/0! 28,000 28,000 28,000 28,000 25,400
#DIV/0! #DIV/0! 43,550 43,550 43,550 43,550 39,500
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 66,350 66,350 66,350 66,350 60,300
#DIV/0! #DIV/0! 113,700 113,700 113,700 113,700 103,300
#DIV/0! #DIV/0! 180,050 180,050 180,050 180,050 163,600
#DIV/0! #DIV/0! 255,750 255,750 255,750 255,750 232,500
#DIV/0! #DIV/0! 29,400 29,400 29,400 29,400 26,700
#DIV/0! #DIV/0! 44,700 44,700 44,700 44,700 40,600
#DIV/0! #DIV/0! 72,850 72,850 72,850 72,850 66,200
#DIV/0! #DIV/0! 115,500 115,500 115,500 115,500 105,000
#DIV/0! #DIV/0! 3,850 3,850 3,850 3,850 3,500
#DIV/0! #DIV/0! 4,600 4,600 4,600 4,600 4,100
#DIV/0! #DIV/0! 6,400 6,400 6,400 6,400 5,800
#DIV/0! #DIV/0! 9,550 9,550 9,550 9,550 8,600
#DIV/0! #DIV/0! 12,450 12,450 12,450 12,450 11,300
#DIV/0! #DIV/0! 17,400 17,400 17,400 17,400 15,800
#DIV/0! #DIV/0! 35,250 35,250 35,250 35,250 32,000
#DIV/0! #DIV/0! 48,800 48,800 48,800 48,800 44,300
#DIV/0! #DIV/0! 81,450 81,450 81,450 81,450 74,000
#DIV/0! #DIV/0! 271,600 271,600 271,600 271,600 246,900
#DIV/0! #DIV/0! 5,100 5,100 5,100 5,100 4,600
#DIV/0! #DIV/0! 12,350 12,350 12,350 12,350 11,200
#DIV/0! #DIV/0! 17,100 17,100 17,100 17,100 15,500
#DIV/0! #DIV/0! 23,400 23,400 23,400 23,400 21,200
#DIV/0! #DIV/0! 39,250 39,250 39,250 39,250 35,600
#DIV/0! #DIV/0! 87,450 87,450 87,450 87,450 79,500
#DIV/0! #DIV/0! 12,350 12,350 12,350 12,350 11,200
#DIV/0! #DIV/0! 17,100 17,100 17,100 17,100 15,500
#DIV/0! #DIV/0! 23,400 23,400 23,400 23,400 21,200
#DIV/0! #DIV/0! 39,250 39,250 39,250 39,250 35,600
#DIV/0! #DIV/0! 87,450 87,450 87,450 87,450 79,500
#DIV/0! #DIV/0! 1,563,200 1,563,200 1,563,200 1,563,200 1,421,000
#DIV/0! #DIV/0! 1,610,550 1,610,550 1,610,550 1,610,550 1,464,100
#DIV/0! #DIV/0! 2,273,750 2,273,750 2,273,750 2,273,750 2,067,000
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 3,979,150 3,979,150 3,979,150 3,979,150 3,617,400
#DIV/0! #DIV/0! 3,950 3,950 3,950 3,950 3,500
#DIV/0! #DIV/0! 5,450 5,450 5,450 5,450 4,900
#DIV/0! #DIV/0! 7,550 7,550 7,550 7,550 6,800
#DIV/0! #DIV/0! 11,000 11,000 11,000 11,000 10,000
#DIV/0! #DIV/0! 15,400 15,400 15,400 15,400 14,000
#DIV/0! #DIV/0! 21,200 21,200 21,200 21,200 19,200
#DIV/0! #DIV/0! 35,250 35,250 35,250 35,250 32,000
#DIV/0! #DIV/0! 59,700 59,700 59,700 59,700 54,200
#DIV/0! #DIV/0! 95,000 95,000 95,000 95,000 86,300
#DIV/0! #DIV/0! 353,100 353,100 353,100 353,100 321,000
#DIV/0! #DIV/0! 57,300 57,300 57,300 57,300 52,000
#DIV/0! #DIV/0! 100,050 100,050 100,050 100,050 90,900
#DIV/0! #DIV/0! 119,900 119,900 119,900 119,900 109,000
#DIV/0! #DIV/0! 192,750 192,750 192,750 192,750 175,200
#DIV/0! #DIV/0! 263,650 263,650 263,650 263,650 239,600
#DIV/0! #DIV/0! 312,550 312,550 312,550 312,550 284,100
#DIV/0! #DIV/0! 844,050 844,050 844,050 844,050 767,300
#DIV/0! #DIV/0! 958,750 958,750 958,750 958,750 871,500
#DIV/0! #DIV/0! 1,438,150 1,438,150 1,438,150 1,438,150 1,307,400
#DIV/0! #DIV/0! 63,500 63,500 63,500 63,500 57,700
#DIV/0! #DIV/0! 66,350 66,350 66,350 66,350 60,300
#DIV/0! #DIV/0! 80,600 80,600 80,600 80,600 73,200
#DIV/0! #DIV/0! 99,400 99,400 99,400 99,400 90,300
#DIV/0! #DIV/0! 182,900 182,900 182,900 182,900 166,200
#DIV/0! #DIV/0! 244,400 244,400 244,400 244,400 222,100
#DIV/0! #DIV/0! 364,750 364,750 364,750 364,750 331,500
#DIV/0! #DIV/0! 386,600 386,600 386,600 386,600 351,400
#DIV/0! #DIV/0! 639,450 639,450 639,450 639,450 581,300
#DIV/0! #DIV/0! 754,100 754,100 754,100 754,100 685,500
#DIV/0! #DIV/0! 122,500 122,500 122,500 122,500 111,300
#DIV/0! #DIV/0! 137,000 137,000 137,000 137,000 124,500
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 162,750 162,750 162,750 162,750 147,900
#DIV/0! #DIV/0! 218,050 218,050 218,050 218,050 198,200
#DIV/0! #DIV/0! 400,450 400,450 400,450 400,450 364,000
#DIV/0! #DIV/0! 706,950 706,950 706,950 706,950 642,600
#DIV/0! #DIV/0! 1,587,800 1,587,800 1,587,800 1,587,800 1,443,400
#DIV/0! #DIV/0! 3,062,000 3,062,000 3,062,000 3,062,000 2,783,600
#DIV/0! #DIV/0! 4,370,400 4,370,400 4,370,400 4,370,400 3,973,000
#DIV/0! #DIV/0! 6,309,100 6,309,100 6,309,100 6,309,100 5,735,500
#DIV/0! #DIV/0! 101,500 101,500 101,500 101,500 92,200
#DIV/0! #DIV/0! 115,500 115,500 115,500 115,500 105,000
#DIV/0! #DIV/0! 13,650 13,650 13,650 13,650 12,400
#DIV/0! #DIV/0! 172,700 172,700 172,700 172,700 157,000
#DIV/0! #DIV/0! 341,650 341,650 341,650 341,650 310,500
#DIV/0! #DIV/0! 600,050 600,050 600,050 600,050 545,500
#DIV/0! #DIV/0! 1,393,000 1,393,000 1,393,000 1,393,000 1,266,300
#DIV/0! #DIV/0! 2,870,150 2,870,150 2,870,150 2,870,150 2,609,200
#DIV/0! #DIV/0! 4,097,400 4,097,400 4,097,400 4,097,400 3,724,900
#DIV/0! #DIV/0! 6,000,950 6,000,950 6,000,950 6,000,950 5,455,400
#DIV/0! #DIV/0! 903,000 903,000 903,000 903,000 820,900
#DIV/0! #DIV/0! 1,033,050 1,033,050 1,033,050 1,033,050 939,100
#DIV/0! #DIV/0! 1,353,450 1,353,450 1,353,450 1,353,450 1,230,400
#DIV/0! #DIV/0! 1,934,900 1,934,900 1,934,900 1,934,900 1,759,000
#DIV/0! #DIV/0! 3,826,200 3,826,200 3,826,200 3,826,200 3,478,300
#DIV/0! #DIV/0! 6,449,800 6,449,800 6,449,800 6,449,800 5,863,400
#DIV/0! #DIV/0! 9,292,150 9,292,150 9,292,150 9,292,150 8,447,400
#DIV/0! #DIV/0! 10,385,300 10,385,300 10,385,300 10,385,300 9,441,100
#DIV/0! #DIV/0! 21,317,300 21,317,300 21,317,300 21,317,300 19,379,300
#DIV/0! #DIV/0! 29,270,300 29,270,300 29,270,300 29,270,300 26,609,300
#DIV/0! #DIV/0! 91,950 91,950 91,950 91,950 83,500
#DIV/0! #DIV/0! 135,450 135,450 135,450 135,450 123,100
#DIV/0! #DIV/0! 198,450 198,450 198,450 198,450 180,400
#DIV/0! #DIV/0! 312,550 312,550 312,550 312,550 284,100
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 426,300 426,300 426,300 426,300 387,500
#DIV/0! #DIV/0! 615,800 615,800 615,800 615,800 559,800
#DIV/0! #DIV/0! 871,700 871,700 871,700 871,700 792,400
#DIV/0! #DIV/0! 1,061,100 1,061,100 1,061,100 1,061,100 964,600
#DIV/0! #DIV/0! 1,478,050 1,478,050 1,478,050 1,478,050 1,343,600
#DIV/0! #DIV/0! 106,150 106,150 106,150 106,150 96,500
#DIV/0! #DIV/0! 156,300 156,300 156,300 156,300 142,000
#DIV/0! #DIV/0! 229,100 229,100 229,100 229,100 208,200
#DIV/0! #DIV/0! 408,750 408,750 408,750 408,750 371,500
#DIV/0! #DIV/0! 557,400 557,400 557,400 557,400 506,700
#DIV/0! #DIV/0! 805,350 805,350 805,350 805,350 732,100
#DIV/0! #DIV/0! 1,139,850 1,139,850 1,139,850 1,139,850 1,036,200
#DIV/0! #DIV/0! 1,387,650 1,387,650 1,387,650 1,387,650 1,261,500
#DIV/0! #DIV/0! 1,932,800 1,932,800 1,932,800 1,932,800 1,757,000
#DIV/0! #DIV/0! 106,050 106,050 106,050 106,050 96,400
#DIV/0! #DIV/0! 156,300 156,300 156,300 156,300 142,000
#DIV/0! #DIV/0! 229,000 229,000 229,000 229,000 208,100
#DIV/0! #DIV/0! 360,750 360,750 360,750 360,750 327,900
#DIV/0! #DIV/0! 492,000 492,000 492,000 492,000 447,200
#DIV/0! #DIV/0! 710,500 710,500 710,500 710,500 645,900
#DIV/0! #DIV/0! 1,005,750 1,005,750 1,005,750 1,005,750 914,300
#DIV/0! #DIV/0! 1,224,400 1,224,400 1,224,400 1,224,400 1,113,000
#DIV/0! #DIV/0! 1,705,400 1,705,400 1,705,400 1,705,400 1,550,300
#DIV/0! #DIV/0! 1,515,950 1,515,950 1,515,950 1,515,950 1,378,100
#DIV/0! #DIV/0! 2,368,550 2,368,550 2,368,550 2,368,550 2,153,200
#DIV/0! #DIV/0! 3,126,550 3,126,550 3,126,550 3,126,550 2,842,300
#DIV/0! #DIV/0! 4,642,350 4,642,350 4,642,350 4,642,350 4,220,300
#DIV/0! #DIV/0! 7,958,450 7,958,450 7,958,450 7,958,450 7,234,900
#DIV/0! #DIV/0! 4,600 4,600 4,600 4,600 4,100
#DIV/0! #DIV/0! 6,400 6,400 6,400 6,400 5,800
#DIV/0! #DIV/0! 9,550 9,550 9,550 9,550 8,600
#DIV/0! #DIV/0! 15,300 15,300 15,300 15,300 13,900
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 18,900 18,900 18,900 18,900 17,100
#DIV/0! #DIV/0! 29,900 29,900 29,900 29,900 27,100
#DIV/0! #DIV/0! 57,000 57,000 57,000 57,000 51,800
#DIV/0! #DIV/0! 86,900 86,900 86,900 86,900 79,000
#DIV/0! #DIV/0! 157,600 157,600 157,600 157,600 143,200
#DIV/0! #DIV/0! 624,950 624,950 624,950 624,950 568,100
#DIV/0! #DIV/0! 1,250 1,250 1,250 1,250 1,100
#DIV/0! #DIV/0! 2,700 2,700 2,700 2,700 2,400
#DIV/0! #DIV/0! 4,200 4,200 4,200 4,200 3,800
#DIV/0! #DIV/0! 5,650 5,650 5,650 5,650 5,100
#DIV/0! #DIV/0! 9,100 9,100 9,100 9,100 8,200
#DIV/0! #DIV/0! 14,550 14,550 14,550 14,550 13,200
#DIV/0! #DIV/0! 24,250 24,250 24,250 24,250 22,000
#DIV/0! #DIV/0! 38,600 38,600 38,600 38,600 35,000
#DIV/0! #DIV/0! 91,100 91,100 91,100 91,100 82,800
#DIV/0! #DIV/0! 409,800 409,800 409,800 409,800 372,500
#DIV/0! #DIV/0! 25,500 25,500 25,500 25,500 23,100
#DIV/0! #DIV/0! 36,400 36,400 36,400 36,400 33,000
#DIV/0! #DIV/0! 9,850 9,850 9,850 9,850 8,900
#DIV/0! #DIV/0! 15,400 15,400 15,400 15,400 14,000
#DIV/0! #DIV/0! 21,700 21,700 21,700 21,700 19,700
#DIV/0! #DIV/0! 34,650 34,650 34,650 34,650 31,500
#DIV/0! #DIV/0! 57,850 57,850 57,850 57,850 52,500
#DIV/0! #DIV/0! 106,150 106,150 106,150 106,150 96,500
#DIV/0! #DIV/0! 246,400 246,400 246,400 246,400 224,000
#DIV/0! #DIV/0! 620,550 620,550 620,550 620,550 564,100
#DIV/0! #DIV/0! 1,070,550 1,070,550 1,070,550 1,070,550 973,200
#DIV/0! #DIV/0! 1,918,450 1,918,450 1,918,450 1,918,450 1,744,000
#DIV/0! #DIV/0! 2,743,750 2,743,750 2,743,750 2,743,750 2,494,300
#DIV/0! #DIV/0! 3,622,900 3,622,900 3,622,900 3,622,900 3,293,500
#DIV/0! #DIV/0! 184,250 184,250 184,250 184,250 167,500
#DIV/0! #DIV/0! 156,200 156,200 156,200 156,200 142,000
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 173,100 173,100 173,100 173,100 157,300
#DIV/0! #DIV/0! 250,500 250,500 250,500 250,500 227,700
#DIV/0! #DIV/0! 318,850 318,850 318,850 318,850 289,800
#DIV/0! #DIV/0! 391,650 391,650 391,650 391,650 356,000
#DIV/0! #DIV/0! 610,350 610,350 610,350 610,350 554,800
#DIV/0! #DIV/0! 651,400 651,400 651,400 651,400 592,100
#DIV/0! #DIV/0! 710,500 710,500 710,500 710,500 645,900
#DIV/0! #DIV/0! 774,350 774,350 774,350 774,350 703,900
#DIV/0! #DIV/0! 819,800 819,800 819,800 819,800 745,200
#DIV/0! #DIV/0! 860,850 860,850 860,850 860,850 782,500
#DIV/0! #DIV/0! 901,800 901,800 901,800 901,800 819,800
#DIV/0! #DIV/0! 942,900 942,900 942,900 942,900 857,100
#DIV/0! #DIV/0! 1,003,050 1,003,050 1,003,050 1,003,050 911,800
#DIV/0! #DIV/0! 1,229,850 1,229,850 1,229,850 1,229,850 1,118,000
#DIV/0! #DIV/0! 1,339,250 1,339,250 1,339,250 1,339,250 1,217,500
#DIV/0! #DIV/0! 1,412,000 1,412,000 1,412,000 1,412,000 1,283,600
#DIV/0! #DIV/0! 1,494,000 1,494,000 1,494,000 1,494,000 1,358,100
#DIV/0! #DIV/0! 1,630,750 1,630,750 1,630,750 1,630,750 1,482,500
#DIV/0! #DIV/0! 1,712,650 1,712,650 1,712,650 1,712,650 1,556,900
#DIV/0! #DIV/0! 1,521,300 1,521,300 1,521,300 1,521,300 1,383,000
#DIV/0! #DIV/0! 1,630,750 1,630,750 1,630,750 1,630,750 1,482,500
#DIV/0! #DIV/0! 1,803,750 1,803,750 1,803,750 1,803,750 1,639,700
#DIV/0! #DIV/0! 2,086,200 2,086,200 2,086,200 2,086,200 1,896,500
#DIV/0! #DIV/0! 2,231,950 2,231,950 2,231,950 2,231,950 2,029,000
#DIV/0! #DIV/0! 1,703,500 1,703,500 1,703,500 1,703,500 1,548,600
#DIV/0! #DIV/0! 2,095,250 2,095,250 2,095,250 2,095,250 1,904,700
#DIV/0! #DIV/0! 2,514,400 2,514,400 2,514,400 2,514,400 2,285,800
#DIV/0! #DIV/0! 2,687,450 2,687,450 2,687,450 2,687,450 2,443,100
#DIV/0! #DIV/0! 3,006,250 3,006,250 3,006,250 3,006,250 2,732,900
#DIV/0! #DIV/0! 94,500 94,500 94,500 94,500 85,900
#DIV/0! #DIV/0! 138,050 138,050 138,050 138,050 125,500
#DIV/0! #DIV/0! 151,800 151,800 151,800 151,800 138,000
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 244,500 244,500 244,500 244,500 222,200
#DIV/0! #DIV/0! 277,700 277,700 277,700 277,700 252,400
#DIV/0! #DIV/0! 505,550 505,550 505,550 505,550 459,500
#DIV/0! #DIV/0! 751,250 751,250 751,250 751,250 682,900
#DIV/0! #DIV/0! 928,900 928,900 928,900 928,900 844,400
#DIV/0! #DIV/0! 5,750 5,750 5,750 5,750 5,200
#DIV/0! #DIV/0! 16,250 16,250 16,250 16,250 14,700
#DIV/0! #DIV/0! 19,100 19,100 19,100 19,100 17,300
#DIV/0! #DIV/0! 47,850 47,850 47,850 47,850 43,500
#DIV/0! #DIV/0! 72,300 72,300 72,300 72,300 65,700
#DIV/0! #DIV/0! 83,550 83,550 83,550 83,550 75,900
#DIV/0! #DIV/0! 160,100 160,100 160,100 160,100 145,500
#DIV/0! #DIV/0! 173,750 173,750 173,750 173,750 157,900
#DIV/0! #DIV/0! 340,400 340,400 340,400 340,400 309,400
#DIV/0! #DIV/0! 583,450 583,450 583,450 583,450 530,400
#DIV/0! #DIV/0! 713,150 713,150 713,150 713,150 648,300
#DIV/0! #DIV/0! 236,250 236,250 236,250 236,250 214,700
#DIV/0! #DIV/0! 330,600 330,600 330,600 330,600 300,500
#DIV/0! #DIV/0! 446,000 446,000 446,000 446,000 405,400
#DIV/0! #DIV/0! 1,040,850 1,040,850 1,040,850 1,040,850 946,200
#DIV/0! #DIV/0! 1,408,150 1,408,150 1,408,150 1,408,150 1,280,100
#DIV/0! #DIV/0! 1,934,500 1,934,500 1,934,500 1,934,500 1,758,600
#DIV/0! #DIV/0! 2,511,700 2,511,700 2,511,700 2,511,700 2,283,300
#DIV/0! #DIV/0! 164,000 164,000 164,000 164,000 149,000
#DIV/0! #DIV/0! 164,000 164,000 164,000 164,000 149,000
#DIV/0! #DIV/0! 176,700 176,700 176,700 176,700 160,600
#DIV/0! #DIV/0! 637,650 637,650 637,650 637,650 579,600
#DIV/0! #DIV/0! 774,350 774,350 774,350 774,350 703,900
#DIV/0! #DIV/0! 865,400 865,400 865,400 865,400 786,700
#DIV/0! #DIV/0! 1,248,000 1,248,000 1,248,000 1,248,000 1,134,500
#DIV/0! #DIV/0! 3,850 3,850 3,850 3,850 3,500
#DIV/0! #DIV/0! 4,900 4,900 4,900 4,900 4,400
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 8,050 8,050 8,050 8,050 7,300
#DIV/0! #DIV/0! 11,400 11,400 11,400 11,400 10,300
#DIV/0! #DIV/0! 14,050 14,050 14,050 14,050 12,700
#DIV/0! #DIV/0! 21,700 21,700 21,700 21,700 19,700
#DIV/0! #DIV/0! 40,700 40,700 40,700 40,700 37,000
#DIV/0! #DIV/0! 59,700 59,700 59,700 59,700 54,200
#DIV/0! #DIV/0! 97,850 97,850 97,850 97,850 88,900
#DIV/0! #DIV/0! 298,800 298,800 298,800 298,800 271,600
#DIV/0! #DIV/0! 2,600 2,600 2,600 2,600 2,300
#DIV/0! #DIV/0! 3,250 3,250 3,250 3,250 2,900
#DIV/0! #DIV/0! 4,900 4,900 4,900 4,900 4,400
#DIV/0! #DIV/0! 6,400 6,400 6,400 6,400 5,800
#DIV/0! #DIV/0! 8,500 8,500 8,500 8,500 7,700
#DIV/0! #DIV/0! 15,200 15,200 15,200 15,200 13,800
#DIV/0! #DIV/0! 22,250 22,250 22,250 22,250 20,200
#DIV/0! #DIV/0! 31,900 31,900 31,900 31,900 29,000
#DIV/0! #DIV/0! 62,050 62,050 62,050 62,050 56,400
#DIV/0! #DIV/0! 1,650 1,650 1,650 1,650 1,500
#DIV/0! #DIV/0! 2,300 2,300 2,300 2,300 2,000
#DIV/0! #DIV/0! 3,450 3,450 3,450 3,450 3,100
#DIV/0! #DIV/0! 6,050 6,050 6,050 6,050 5,500
#DIV/0! #DIV/0! 8,400 8,400 8,400 8,400 7,600
#DIV/0! #DIV/0! 14,700 14,700 14,700 14,700 13,300
#DIV/0! #DIV/0! 20,550 20,550 20,550 20,550 18,600
#DIV/0! #DIV/0! 31,900 31,900 31,900 31,900 29,000
#DIV/0! #DIV/0! 62,550 62,550 62,550 62,550 56,800
#DIV/0! #DIV/0! 34,400 34,400 34,400 34,400 31,200
#DIV/0! #DIV/0! 48,150 48,150 48,150 48,150 43,700
#DIV/0! #DIV/0! 64,150 64,150 64,150 64,150 58,300
#DIV/0! #DIV/0! 128,300 128,300 128,300 128,300 116,600
#DIV/0! #DIV/0! 168,300 168,300 168,300 168,300 153,000
#DIV/0! #DIV/0! 184,250 184,250 184,250 184,250 167,500
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 384,800 384,800 384,800 384,800 349,800
#DIV/0! #DIV/0! 737,600 737,600 737,600 737,600 670,500
#DIV/0! #DIV/0! 1,010,200 1,010,200 1,010,200 1,010,200 918,300
#DIV/0! #DIV/0! 59,600 59,600 59,600 59,600 54,100
#DIV/0! #DIV/0! 73,250 73,250 73,250 73,250 66,500
#DIV/0! #DIV/0! 106,450 106,450 106,450 106,450 96,700
#DIV/0! #DIV/0! 149,300 149,300 149,300 149,300 135,700
#DIV/0! #DIV/0! 545,650 545,650 545,650 545,650 496,000
#DIV/0! #DIV/0! 636,600 636,600 636,600 636,600 578,700
#DIV/0! #DIV/0! 852,800 852,800 852,800 852,800 775,200
#DIV/0! #DIV/0! 271,000 271,000 271,000 271,000 246,300
#DIV/0! #DIV/0! 364,750 364,750 364,750 364,750 331,500
#DIV/0! #DIV/0! 410,650 410,650 410,650 410,650 373,300
#DIV/0! #DIV/0! 406,450 406,450 406,450 406,450 369,500
#DIV/0! #DIV/0! 468,900 468,900 468,900 468,900 426,200
#DIV/0! #DIV/0! 521,100 521,100 521,100 521,100 473,700
#DIV/0! #DIV/0! 573,150 573,150 573,150 573,150 521,000
#DIV/0! #DIV/0! 614,850 614,850 614,850 614,850 558,900
#DIV/0! #DIV/0! 781,500 781,500 781,500 781,500 710,400
#DIV/0! #DIV/0! 928,500 928,500 928,500 928,500 844,000
#DIV/0! #DIV/0! 729,500 729,500 729,500 729,500 663,100
#DIV/0! #DIV/0! 937,850 937,850 937,850 937,850 852,500
#DIV/0! #DIV/0! 990,000 990,000 990,000 990,000 900,000
#DIV/0! #DIV/0! 1,073,400 1,073,400 1,073,400 1,073,400 975,800
#DIV/0! #DIV/0! 1,141,100 1,141,100 1,141,100 1,141,100 1,037,300
#DIV/0! #DIV/0! 1,172,400 1,172,400 1,172,400 1,172,400 1,065,800
#DIV/0! #DIV/0! 1,261,050 1,261,050 1,261,050 1,261,050 1,146,400
#DIV/0! #DIV/0! 1,375,700 1,375,700 1,375,700 1,375,700 1,250,600
#DIV/0! #DIV/0! 1,421,550 1,421,550 1,421,550 1,421,550 1,292,300
#DIV/0! #DIV/0! 1,658,050 1,658,050 1,658,050 1,658,050 1,507,300
#DIV/0! #DIV/0! 1,800,100 1,800,100 1,800,100 1,800,100 1,636,400
#DIV/0! #DIV/0! 1,478,050 1,478,050 1,478,050 1,478,050 1,343,600
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 1,506,400 1,506,400 1,506,400 1,506,400 1,369,400
#DIV/0! #DIV/0! 1,610,550 1,610,550 1,610,550 1,610,550 1,464,100
#DIV/0! #DIV/0! 1,750,850 1,750,850 1,750,850 1,750,850 1,591,600
#DIV/0! #DIV/0! 1,771,750 1,771,750 1,771,750 1,771,750 1,610,600
#DIV/0! #DIV/0! 2,084,450 2,084,450 2,084,450 2,084,450 1,894,900
#DIV/0! #DIV/0! 2,273,750 2,273,750 2,273,750 2,273,750 2,067,000
#DIV/0! #DIV/0! 3,126,550 3,126,550 3,126,550 3,126,550 2,842,300
#DIV/0! #DIV/0! 2,434,950 2,434,950 2,434,950 2,434,950 2,213,500
#DIV/0! #DIV/0! 2,648,100 2,648,100 2,648,100 2,648,100 2,407,300
#DIV/0! #DIV/0! 2,823,300 2,823,300 2,823,300 2,823,300 2,566,600
#DIV/0! #DIV/0! 3,135,900 3,135,900 3,135,900 3,135,900 2,850,800
#DIV/0! #DIV/0! 3,552,850 3,552,850 3,552,850 3,552,850 3,229,800
#DIV/0! #DIV/0! 4,073,850 4,073,850 4,073,850 4,073,850 3,703,500
#DIV/0! #DIV/0! 4,263,500 4,263,500 4,263,500 4,263,500 3,875,900
#DIV/0! #DIV/0! 4,860,300 4,860,300 4,860,300 4,860,300 4,418,400
#DIV/0! #DIV/0! 5,277,300 5,277,300 5,277,300 5,277,300 4,797,500
#DIV/0! #DIV/0! 14,800 14,800 14,800 14,800 13,400
#DIV/0! #DIV/0! 50,900 50,900 50,900 50,900 46,200
#DIV/0! #DIV/0! 86,200 86,200 86,200 86,200 78,300
#DIV/0! #DIV/0! 102,750 102,750 102,750 102,750 93,400
#DIV/0! #DIV/0! 136,500 136,500 136,500 136,500 124,000
#DIV/0! #DIV/0! 160,100 160,100 160,100 160,100 145,500
#DIV/0! #DIV/0! 169,350 169,350 169,350 169,350 153,900
#DIV/0! #DIV/0! 294,300 294,300 294,300 294,300 267,500
#DIV/0! #DIV/0! 295,050 295,050 295,050 295,050 268,200
#DIV/0! #DIV/0! 324,000 324,000 324,000 324,000 294,500
#DIV/0! #DIV/0! 384,300 384,300 384,300 384,300 349,300
#DIV/0! #DIV/0! 758,200 758,200 758,200 758,200 689,200
#DIV/0! #DIV/0! 705,050 705,050 705,050 705,050 640,900
#DIV/0! #DIV/0! 888,050 888,050 888,050 888,050 807,300
#DIV/0! #DIV/0! 975,550 975,550 975,550 975,550 886,800
#DIV/0! #DIV/0! 1,656,900 1,656,900 1,656,900 1,656,900 1,506,200
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 1,786,250 1,786,250 1,786,250 1,786,250 1,623,800
#DIV/0! #DIV/0! 1,073,800 1,073,800 1,073,800 1,073,800 976,100
#DIV/0! #DIV/0! 110,750 110,750 110,750 110,750 100,600
#DIV/0! #DIV/0! 160,100 160,100 160,100 160,100 145,500
#DIV/0! #DIV/0! 182,250 182,250 182,250 182,250 165,600
#DIV/0! #DIV/0! 246,100 246,100 246,100 246,100 223,700
#DIV/0! #DIV/0! 274,650 274,650 274,650 274,650 249,600
#DIV/0! #DIV/0! 301,950 301,950 301,950 301,950 274,500
#DIV/0! #DIV/0! 377,350 377,350 377,350 377,350 343,000
#DIV/0! #DIV/0! 439,700 439,700 439,700 439,700 399,700
#DIV/0! #DIV/0! 486,750 486,750 486,750 486,750 442,500
#DIV/0! #DIV/0! 560,900 560,900 560,900 560,900 509,900
#DIV/0! #DIV/0! 999,150 999,150 999,150 999,150 908,300
#DIV/0! #DIV/0! 962,700 962,700 962,700 962,700 875,100
#DIV/0! #DIV/0! 1,161,900 1,161,900 1,161,900 1,161,900 1,056,200
#DIV/0! #DIV/0! 1,294,400 1,294,400 1,294,400 1,294,400 1,176,700
#DIV/0! #DIV/0! 3,349,800 3,349,800 3,349,800 3,349,800 3,045,200
#DIV/0! #DIV/0! 3,920,350 3,920,350 3,920,350 3,920,350 3,563,900
#DIV/0! #DIV/0! 2,891,350 2,891,350 2,891,350 2,891,350 2,628,500
#DIV/0! #DIV/0! 5,650 5,650 5,650 5,650 5,100
#DIV/0! #DIV/0! 8,400 8,400 8,400 8,400 7,600
#DIV/0! #DIV/0! 13,400 13,400 13,400 13,400 12,100
#DIV/0! #DIV/0! 20,050 20,050 20,050 20,050 18,200
#DIV/0! #DIV/0! 25,500 25,500 25,500 25,500 23,100
#DIV/0! #DIV/0! 38,000 38,000 38,000 38,000 34,500
#DIV/0! #DIV/0! 86,900 86,900 86,900 86,900 79,000
#DIV/0! #DIV/0! 114,100 114,100 114,100 114,100 103,700
#DIV/0! #DIV/0! 206,400 206,400 206,400 206,400 187,600
#DIV/0! #DIV/0! 733,500 733,500 733,500 733,500 666,800
#DIV/0! #DIV/0! 364,750 364,750 364,750 364,750 331,500
#DIV/0! #DIV/0! 490,950 490,950 490,950 490,950 446,300
#DIV/0! #DIV/0! 552,700 552,700 552,700 552,700 502,400
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 547,150 547,150 547,150 547,150 497,400
#DIV/0! #DIV/0! 631,250 631,250 631,250 631,250 573,800
#DIV/0! #DIV/0! 701,400 701,400 701,400 701,400 637,600
#DIV/0! #DIV/0! 771,600 771,600 771,600 771,600 701,400
#DIV/0! #DIV/0! 827,600 827,600 827,600 827,600 752,300
#DIV/0! #DIV/0! 1,052,300 1,052,300 1,052,300 1,052,300 956,600
#DIV/0! #DIV/0! 1,250,000 1,250,000 1,250,000 1,250,000 1,136,300
#DIV/0! #DIV/0! 982,050 982,050 982,050 982,050 892,700
#DIV/0! #DIV/0! 1,262,600 1,262,600 1,262,600 1,262,600 1,147,800
#DIV/0! #DIV/0! 1,332,750 1,332,750 1,332,750 1,332,750 1,211,500
#DIV/0! #DIV/0! 1,445,000 1,445,000 1,445,000 1,445,000 1,313,600
#DIV/0! #DIV/0! 1,536,250 1,536,250 1,536,250 1,536,250 1,396,500
#DIV/0! #DIV/0! 1,578,250 1,578,250 1,578,250 1,578,250 1,434,700
#DIV/0! #DIV/0! 1,697,500 1,697,500 1,697,500 1,697,500 1,543,100
#DIV/0! #DIV/0! 1,851,850 1,851,850 1,851,850 1,851,850 1,683,500
#DIV/0! #DIV/0! 1,913,700 1,913,700 1,913,700 1,913,700 1,739,700
#DIV/0! #DIV/0! 2,231,950 2,231,950 2,231,950 2,231,950 2,029,000
#DIV/0! #DIV/0! 2,423,150 2,423,150 2,423,150 2,423,150 2,202,800
#DIV/0! #DIV/0! 1,989,600 1,989,600 1,989,600 1,989,600 1,808,700
#DIV/0! #DIV/0! 2,027,950 2,027,950 2,027,950 2,027,950 1,843,500
#DIV/0! #DIV/0! 2,168,100 2,168,100 2,168,100 2,168,100 1,971,000
#DIV/0! #DIV/0! 2,357,000 2,357,000 2,357,000 2,357,000 2,142,700
#DIV/0! #DIV/0! 2,384,950 2,384,950 2,384,950 2,384,950 2,168,100
#DIV/0! #DIV/0! 2,805,900 2,805,900 2,805,900 2,805,900 2,550,800
#DIV/0! #DIV/0! 3,060,850 3,060,850 3,060,850 3,060,850 2,782,500
#DIV/0! #DIV/0! 4,208,700 4,208,700 4,208,700 4,208,700 3,826,000
#DIV/0! #DIV/0! 3,277,750 3,277,750 3,277,750 3,277,750 2,979,700
#DIV/0! #DIV/0! 3,564,750 3,564,750 3,564,750 3,564,750 3,240,600
#DIV/0! #DIV/0! 3,800,650 3,800,650 3,800,650 3,800,650 3,455,100
#DIV/0! #DIV/0! 4,221,500 4,221,500 4,221,500 4,221,500 3,837,700
#DIV/0! #DIV/0! 4,782,600 4,782,600 4,782,600 4,782,600 4,347,800
#DIV/0! #DIV/0! 5,484,150 5,484,150 5,484,150 5,484,150 4,985,500
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 5,739,300 5,739,300 5,739,300 5,739,300 5,217,500
#DIV/0! #DIV/0! 6,542,650 6,542,650 6,542,650 6,542,650 5,947,800
#DIV/0! #DIV/0! 7,103,950 7,103,950 7,103,950 7,103,950 6,458,100
#DIV/0! #DIV/0! 6,400 6,400 6,400 6,400 5,800
#DIV/0! #DIV/0! 8,600 8,600 8,600 8,600 7,800
#DIV/0! #DIV/0! 12,700 12,700 12,700 12,700 11,500
#DIV/0! #DIV/0! 15,300 15,300 15,300 15,300 13,900
#DIV/0! #DIV/0! 23,100 23,100 23,100 23,100 21,000
#DIV/0! #DIV/0! 43,350 43,350 43,350 43,350 39,400
#DIV/0! #DIV/0! 68,000 68,000 68,000 68,000 61,800
#DIV/0! #DIV/0! 124,950 124,950 124,950 124,950 113,500
#DIV/0! #DIV/0! 332,300 332,300 332,300 332,300 302,000
#DIV/0! #DIV/0! 134,050 134,050 134,050 134,050 121,800
#DIV/0! #DIV/0! 201,150 201,150 201,150 201,150 182,800
#DIV/0! #DIV/0! 377,150 377,150 377,150 377,150 342,800
#DIV/0! #DIV/0! 1,173,350 1,173,350 1,173,350 1,173,350 1,066,600
#DIV/0! #DIV/0! 1,341,050 1,341,050 1,341,050 1,341,050 1,219,100
#DIV/0! #DIV/0! 2,011,450 2,011,450 2,011,450 2,011,450 1,828,500
#DIV/0! #DIV/0! 2,514,400 2,514,400 2,514,400 2,514,400 2,285,800
#DIV/0! #DIV/0! 3,687,700 3,687,700 3,687,700 3,687,700 3,352,400
#DIV/0! #DIV/0! 5,866,850 5,866,850 5,866,850 5,866,850 5,333,500
#DIV/0! #DIV/0! 251,350 251,350 251,350 251,350 228,500
#DIV/0! #DIV/0! 15,400 15,400 15,400 15,400 14,000
#DIV/0! #DIV/0! 18,900 18,900 18,900 18,900 17,100
#DIV/0! #DIV/0! 23,100 23,100 23,100 23,100 21,000
#DIV/0! #DIV/0! 32,550 32,550 32,550 32,550 29,500
#DIV/0! #DIV/0! 43,350 43,350 43,350 43,350 39,400
#DIV/0! #DIV/0! 62,450 62,450 62,450 62,450 56,700
#DIV/0! #DIV/0! 108,650 108,650 108,650 108,650 98,700
#DIV/0! #DIV/0! 171,150 171,150 171,150 171,150 155,500
#DIV/0! #DIV/0! 326,100 326,100 326,100 326,100 296,400
#DIV/0! #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! -
#DIV/0! #DIV/0! 11,550 11,550 11,550 11,550 10,500
#DIV/0! #DIV/0! 12,600 12,600 12,600 12,600 11,400
#DIV/0! #DIV/0! 13,700 13,700 13,700 13,700 12,400
#DIV/0! #DIV/0! 19,250 19,250 19,250 19,250 17,500
#DIV/0! #DIV/0! 21,800 21,800 21,800 21,800 19,800
#DIV/0! #DIV/0! 23,700 23,700 23,700 23,700 21,500
#DIV/0! #DIV/0! 35,650 35,650 35,650 35,650 32,400
#DIV/0! #DIV/0! 56,250 56,250 56,250 56,250 51,100
#DIV/0! #DIV/0! 80,450 80,450 80,450 80,450 73,100
#DIV/0! #DIV/0! 101,950 101,950 101,950 101,950 92,600
#DIV/0! #DIV/0! 155,750 155,750 155,750 155,750 141,500
#DIV/0! #DIV/0! 33,400 33,400 33,400 33,400 30,300
#DIV/0! #DIV/0! 51,150 51,150 51,150 51,150 46,500
#DIV/0! #DIV/0! 72,650 72,650 72,650 72,650 66,000
#DIV/0! #DIV/0! 28,100 28,100 28,100 28,100 25,500
#DIV/0! #DIV/0! 43,850 43,850 43,850 43,850 39,800
#DIV/0! #DIV/0! 60,050 60,050 60,050 60,050 54,500
#DIV/0! #DIV/0! 37,800 37,800 37,800 37,800 34,300
#DIV/0! #DIV/0! 59,800 59,800 59,800 59,800 54,300
#DIV/0! #DIV/0! 84,850 84,850 84,850 84,850 77,100
#DIV/0! #DIV/0! 61,150 61,150 61,150 61,150 55,500
#DIV/0! #DIV/0! 104,850 104,850 104,850 104,850 95,300
#DIV/0! #DIV/0! 158,800 158,800 158,800 158,800 144,300
#DIV/0! #DIV/0! 224,050 224,050 224,050 224,050 203,600
#DIV/0! #DIV/0! 40,350 40,350 40,350 40,350 36,600
#DIV/0! #DIV/0! 62,950 62,950 62,950 62,950 57,200
#DIV/0! #DIV/0! 89,600 89,600 89,600 89,600 81,400
#DIV/0! #DIV/0! 107,450 107,450 107,450 107,450 97,600
#DIV/0! #DIV/0! 162,800 162,800 162,800 162,800 148,000
#DIV/0! #DIV/0! 228,600 228,600 228,600 228,600 207,800
#DIV/0! #DIV/0! 154,750 154,750 154,750 154,750 140,600
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 30,850 30,850 30,850 30,850 28,000
#DIV/0! #DIV/0! 14,050 #DIV/0! #DIV/0! 14,050 #DIV/0!
#DIV/0! #DIV/0! 13,060 #DIV/0! #DIV/0! 13,060 11,300
#DIV/0! #DIV/0! 19,780 19,780 19,780 19,780 17,900
#DIV/0! #DIV/0! 16,000 #DIV/0! #DIV/0! 16,000 #DIV/0!
#DIV/0! #DIV/0! 279,900 279,900 279,900 279,900 254,400
#DIV/0! #DIV/0! 1,632,500 1,632,500 1,632,500 1,632,500 1,484,000
#DIV/0! #DIV/0! 19,300 #DIV/0! #DIV/0! 19,300 #DIV/0!
#DIV/0! #DIV/0! 19,300 19,300 19,300 19,300 17,500
#DIV/0! #DIV/0! 21,900 21,900 21,900 21,900 19,900
#DIV/0! #DIV/0! 17,500 17,500 17,500 17,500 15,900
#DIV/0! #DIV/0! 16,900 16,900 16,900 16,900 15,300
#DIV/0! #DIV/0! 16,900 #DIV/0! #DIV/0! 16,900 #DIV/0!
#DIV/0! #DIV/0! 12,700 #DIV/0! #DIV/0! 12,700 #DIV/0!
#DIV/0! #DIV/0! 12,700 12,700 12,700 11,500
#DIV/0! #DIV/0! 12,700 12,700 12,700 11,500
#DIV/0! #DIV/0! 12,700 12,700 12,700 12,700 11,500
#DIV/0! #DIV/0! 20,450 20,450 20,450 20,450 18,500
#DIV/0! #DIV/0! 10,250 10,250 10,250 10,250 9,300
#DIV/0! #DIV/0! 12,894 #DIV/0! #DIV/0! 12,894 10,500
#DIV/0! #DIV/0! 40,200 40,200 40,200 40,200 36,500
#DIV/0! #DIV/0! 56,150 56,150 56,150 56,150 51,000
#DIV/0! #DIV/0! 221,400 221,400 221,400 221,400 201,200
#DIV/0! #DIV/0! 258,900 258,900 258,900 258,900 235,300
#DIV/0! #DIV/0! 598,500 598,500 598,500 598,500 544,000
#DIV/0! #DIV/0! 315,000 315,000 315,000 315,000 286,300
#DIV/0! #DIV/0! 210,000 210,000 210,000 210,000 190,900
#DIV/0! #DIV/0! 115,500 115,500 115,500 115,500 105,000
#DIV/0! #DIV/0! 42,000 42,000 42,000 42,000 38,100
#DIV/0! #DIV/0! 36,750 36,750 36,750 36,750 33,400
#DIV/0! #DIV/0! 123,000 #DIV/0! #DIV/0! 123,000 #DIV/0!
#DIV/0! #DIV/0! 97,750 #DIV/0! #DIV/0! 97,750 #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 63,250 #DIV/0! #DIV/0! 63,250 #DIV/0!
#DIV/0! #DIV/0! 196,350 196,350 196,350 196,350 178,500
#DIV/0! #DIV/0! 21,000 21,000 21,000 21,000 19,000
#DIV/0! #DIV/0! 52,500 52,500 52,500 52,500 47,700
#DIV/0! #DIV/0! 10,500 10,500 10,500 10,500 9,500
#DIV/0! #DIV/0! 210,000 210,000 210,000 210,000 190,900
#DIV/0! #DIV/0! 315,000 315,000 315,000 315,000 286,300
#DIV/0! #DIV/0! 42,000 42,000 42,000 42,000 38,100
#DIV/0! #DIV/0! 31,500 31,500 31,500 31,500 28,600
#DIV/0! #DIV/0! 165,250 #DIV/0! #DIV/0! 165,250 #DIV/0!
#DIV/0! #DIV/0! 154,750 #DIV/0! #DIV/0! 154,750 #DIV/0!
#DIV/0! #DIV/0! 1,850 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! 123,900 #DIV/0! #DIV/0! 123,900 #DIV/0!
#DIV/0! #DIV/0! 113,600 #DIV/0! #DIV/0! 113,600 #DIV/0!
#DIV/0! #DIV/0! 1,962,100 1,962,100 1,962,100 1,962,100 1,783,700
#DIV/0! #DIV/0! 445,625 #DIV/0! #DIV/0! 445,625 #DIV/0!
#DIV/0! #DIV/0! 826,100 826,100 826,100 826,100 751,000
#DIV/0! #DIV/0! 33,050 33,050 33,050 33,050 30,000
#DIV/0! #DIV/0! 5,450 5,450 5,450 5,450 4,900
#DIV/0! #DIV/0! 4,200 4,200 4,200 4,200 3,800
#DIV/0! #DIV/0! 1,550 1,550 1,550 1,550 1,400
#DIV/0! #DIV/0! 172,200 172,200 172,200 172,200 156,500
#DIV/0! #DIV/0! 1,150 1,150 1,150 1,150 1,000
#DIV/0! #DIV/0! 31,500 31,500 31,500 31,500 28,600
#DIV/0! #DIV/0! 1,749,050 1,749,050 1,749,050 1,749,050 1,590,000
#DIV/0! #DIV/0! 654,150 #DIV/0! #DIV/0! 654,150 #DIV/0!
#DIV/0! #DIV/0! 32,775 #DIV/0! #DIV/0! 32,775 #DIV/0!
#DIV/0! #DIV/0! 138,000 #DIV/0! #DIV/0! 138,000 #DIV/0!
#DIV/0! #DIV/0! 1,293,750 #DIV/0! #DIV/0! 1,293,750 #DIV/0!
#DIV/0! #DIV/0! 1,437,500 #DIV/0! #DIV/0! 1,437,500 #DIV/0!
#DIV/0! #DIV/0! 1,900,000 #DIV/0! #DIV/0! 1,900,000 1,650,000
#DIV/0! #DIV/0! 2,075,000 #DIV/0! #DIV/0! 2,075,000 1,800,000
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 645,000 #DIV/0! #DIV/0! 645,000 #DIV/0!
#DIV/0! #DIV/0! 635,000 #DIV/0! #DIV/0! 635,000 555,000
#DIV/0! #DIV/0! 718,750 #DIV/0! #DIV/0! 718,750 #DIV/0!
#DIV/0! #DIV/0! 595,000 #DIV/0! #DIV/0! 595,000 520,000
#DIV/0! #DIV/0! 550,000 #DIV/0! #DIV/0! 550,000 486,000
#DIV/0! #DIV/0! 23,000 #DIV/0! #DIV/0! 23,000 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 227,700 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 333,500 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 276,000 #DIV/0!
#DIV/0! #DIV/0! 32,800 #DIV/0! #DIV/0! 32,800 #DIV/0!
#DIV/0! #DIV/0! 41,000 #DIV/0! #DIV/0! 41,000 #DIV/0!
#DIV/0! #DIV/0! 83,000 #DIV/0! #DIV/0! 83,000 #DIV/0!
#DIV/0! #DIV/0! 33,500 #DIV/0! #DIV/0! 33,500 #DIV/0!
#DIV/0! #DIV/0! 1,700,000 #DIV/0! #DIV/0! 1,700,000 #DIV/0!
#DIV/0! #DIV/0! 550,000 #DIV/0! #DIV/0! 550,000 #DIV/0!
#DIV/0! #DIV/0! 700,000 #DIV/0! #DIV/0! 700,000 #DIV/0!
#DIV/0! #DIV/0! 33,500 #DIV/0! #DIV/0! 33,500 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 30,850 #DIV/0! #DIV/0! 30,850 #DIV/0!
#DIV/0! #DIV/0! 52,900 52,900 52,900 52,900 48,000
#DIV/0! #DIV/0! 350,150 350,150 350,150 350,150 318,300
#DIV/0! #DIV/0! 109,600 109,600 109,600 109,600 99,600
#DIV/0! #DIV/0! 101,500 101,500 101,500 101,500 92,200
#DIV/0! #DIV/0! 30,000 #DIV/0! #DIV/0! 30,000 #DIV/0!
#DIV/0! #DIV/0! 38,000 #DIV/0! #DIV/0! 38,000 #DIV/0!
#DIV/0! #DIV/0! 26,850 #DIV/0! #DIV/0! 26,850 #DIV/0!
#DIV/0! #DIV/0! 21,200 21,200 21,200 21,200 19,200
#DIV/0! #DIV/0! 20,050 #DIV/0! #DIV/0! 20,050 #DIV/0!
#DIV/0! #DIV/0! 27,050 #DIV/0! #DIV/0! 27,050 #DIV/0!
#DIV/0! #DIV/0! 15,300 #DIV/0! #DIV/0! 15,300 #DIV/0!
#DIV/0! #DIV/0! 278,250 278,250 278,250 278,250 252,900
#DIV/0! #DIV/0!
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 23,400 #DIV/0! #DIV/0! 23,400 #DIV/0!
#DIV/0! #DIV/0! 33,900 #DIV/0! #DIV/0! 33,900 #DIV/0!
#DIV/0! #DIV/0! 42,500 #DIV/0! #DIV/0! 42,500 #DIV/0!
#DIV/0! #DIV/0! 46,600 #DIV/0! #DIV/0! 46,600 #DIV/0!
#DIV/0! #DIV/0! 57,300 #DIV/0! #DIV/0! 57,300 #DIV/0!
#DIV/0! #DIV/0! 27,150 #DIV/0! #DIV/0! 27,150 #DIV/0!
#DIV/0! #DIV/0! 36,000 #DIV/0! #DIV/0! 36,000 #DIV/0!
#DIV/0! #DIV/0! 46,600 #DIV/0! #DIV/0! 46,600 #DIV/0!
#DIV/0! #DIV/0! 64,550 #DIV/0! #DIV/0! 52,900 #DIV/0!
#DIV/0! #DIV/0! 57,300 #DIV/0! #DIV/0! 64,400 #DIV/0!
#DIV/0! #DIV/0! 174,600 174,600 174,600 174,600 158,700
#DIV/0! -
#DIV/0! #DIV/0! 309,750 309,750 309,750 309,750 281,500
#DIV/0! #DIV/0! 211,950 211,950 211,950 211,950 192,600
#DIV/0! #DIV/0! 196,750 196,750 196,750 196,750 178,800
#DIV/0! -
#DIV/0! #DIV/0! 247,800 247,800 247,800 247,800 225,200
#DIV/0! #DIV/0! 232,750 232,750 232,750 232,750 211,500
#DIV/0! #DIV/0! 217,550 217,550 217,550 217,550 197,700
#DIV/0! -
#DIV/0! #DIV/0! 275,400 275,400 275,400 275,400 250,300
#DIV/0! #DIV/0! 260,250 260,250 260,250 260,250 236,500
#DIV/0! #DIV/0! 245,050 245,050 245,050 245,050 222,700
#DIV/0! #DIV/0! 333,450 333,450 333,450 333,450 303,100
#DIV/0! #DIV/0! 141,000 141,000 141,000 141,000 128,100
#DIV/0! #DIV/0! 83,450 83,450 83,450 83,450 75,800
#DIV/0! #DIV/0! 19,300 19,300 19,300 19,300 17,500
#DIV/0! #DIV/0! 64,150 64,150 64,150 64,150 58,300
#DIV/0! #DIV/0! 57,720,700 57,720,700 57,720,700 57,720,700 52,473,300
#DIV/0! #DIV/0! 19,240,300 19,240,300 19,240,300 19,240,300 17,491,100
#DIV/0! #DIV/0! 44,893,900 44,893,900 44,893,900 44,893,900 40,812,600
#DIV/0! #DIV/0! 26,087,450 26,087,450 26,087,450 26,087,450 23,715,800
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 3,160,000 #DIV/0! #DIV/0! 3,160,000 #DIV/0!
#DIV/0! #DIV/0! 2,260,000 #DIV/0! #DIV/0! 2,260,000 #DIV/0!
#DIV/0! #DIV/0! 1,221,000 #DIV/0! #DIV/0! 1,221,000 #DIV/0!
#DIV/0! #DIV/0! 805,000 #DIV/0! #DIV/0! 805,000 725,000
#DIV/0! #DIV/0! 874,000 #DIV/0! #DIV/0! 874,000 #DIV/0!
#DIV/0! #DIV/0! 902,750 #DIV/0! #DIV/0! 902,750 #DIV/0!
#DIV/0! #DIV/0! 971,750 #DIV/0! #DIV/0! 971,750 823,000
#DIV/0! #DIV/0! 989,000 #DIV/0! #DIV/0! 989,000 #DIV/0!
#DIV/0! #DIV/0! 1,006,250 #DIV/0! #DIV/0! 1,006,250 #DIV/0!
#DIV/0! #DIV/0! 1,023,500 #DIV/0! #DIV/0! 1,023,500 876,000
#DIV/0! #DIV/0! 1,109,750 #DIV/0! #DIV/0! 1,048,417 911,000
#DIV/0! #DIV/0! 1,144,250 #DIV/0! #DIV/0! 1,144,250 #DIV/0!
#DIV/0! #DIV/0! 1,207,500 #DIV/0! #DIV/0! 1,207,500 #DIV/0!
#DIV/0! #DIV/0! 1,265,000 #DIV/0! #DIV/0! 1,265,000 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0! 53,750 #DIV/0! #DIV/0! 53,750 #DIV/0!
#DIV/0! #DIV/0! 53,750 #DIV/0! #DIV/0! 53,750 #DIV/0!
#DIV/0! #DIV/0! 28,000 #DIV/0! #DIV/0! 28,000 #DIV/0!
#DIV/0! #DIV/0! 24,000 #DIV/0! #DIV/0! 24,000 #DIV/0!
#DIV/0! #DIV/0! 42,000 #DIV/0! #DIV/0! 42,000 #DIV/0!
#DIV/0! #DIV/0! 69,900 #DIV/0! #DIV/0! 69,900 #DIV/0!
#DIV/0! #DIV/0! 114,750 114,750 114,750 114,750 104,300
#DIV/0! #DIV/0! 28,750 28,750 28,750 28,750 26,100
#DIV/0! #DIV/0! 27,050 #DIV/0! 27,050 27,050 #DIV/0!
#DIV/0! #DIV/0! 12,900 12,900 12,900 12,900 11,700
#DIV/0! #DIV/0! 77,450 77,450 77,450 77,450 70,400
#DIV/0! #DIV/0! 3,550 3,550 3,550 3,550 3,200
#DIV/0! #DIV/0! 3,350 3,350 3,350 3,350 3,000
#DIV/0! #DIV/0! 7,200 7,200 7,200 7,200 6,500
#DIV/0! #DIV/0! 9,100 #DIV/0! #DIV/0! 9,100 #DIV/0!
#DIV/0! #DIV/0! 28,750 #DIV/0! #DIV/0! 28,750 #DIV/0!
#DIV/0! #DIV/0! 26,850 26,850 26,850 26,850 24,400
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 14,700 14,700 14,700 14,700 13,300
#DIV/0! #DIV/0! 50,150 50,150 50,150 50,150 45,500
#DIV/0! #DIV/0! 11,400 11,400 11,400 11,400 10,300
#DIV/0! #DIV/0! 25,050 25,050 25,050 25,050 22,700
#DIV/0! #DIV/0! 78,850 #DIV/0! #DIV/0! 40,250 #DIV/0!
#DIV/0! #DIV/0! 19,400 20,000 20,000 20,000 #DIV/0!
#DIV/0! #DIV/0! 8,600 #DIV/0! #DIV/0! 8,600 #DIV/0!
#DIV/0! #DIV/0! 53,750 #DIV/0! #DIV/0! 53,750 #DIV/0!
#DIV/0! #DIV/0! 32,200 #DIV/0! #DIV/0! 32,200 #DIV/0!
#DIV/0! #DIV/0! 26,750 26,750 26,750 26,750 24,300
#DIV/0! #DIV/0! 17,950 17,950 17,950 17,950 16,300
#DIV/0! #DIV/0! 21,000 #DIV/0! #DIV/0! 21,000 #DIV/0!
#DIV/0! #DIV/0! 25,500 25,500 25,500 25,500 23,100
#DIV/0! #DIV/0! 50,150 50,150 50,150 50,150 45,500
#DIV/0! #DIV/0! 15,850 15,850 15,850 15,850 14,400
#DIV/0! #DIV/0! 35,800 #DIV/0! #DIV/0! 27,025 #DIV/0!
#DIV/0! #DIV/0! 33,150 #DIV/0! #DIV/0! 33,150 27,800
#DIV/0! #DIV/0! 39,650 #DIV/0! #DIV/0! 39,650 #DIV/0!
#DIV/0! #DIV/0! 27,000 #DIV/0! #DIV/0! 27,000 #DIV/0!
#DIV/0! #DIV/0! 70,500 #DIV/0! #DIV/0! 70,500 #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! 100,050 #DIV/0!
#DIV/0! #DIV/0!
-
#DIV/0! #DIV/0! 16,550 #DIV/0! #DIV/0! 16,550 #DIV/0!
#DIV/0! #DIV/0! 25,600 25,600 25,600 25,600 23,200
#DIV/0! #DIV/0! 19,800 #DIV/0! #DIV/0! 19,800 #DIV/0!
#DIV/0! #DIV/0! 141,000 141,000 141,000 141,000 128,100
#DIV/0! #DIV/0! 87,150 87,150 87,150 87,150 79,200
#DIV/0! #DIV/0! 43,550 43,550 43,550 43,550 39,500
#DIV/0! #DIV/0! 28,200 28,200 28,200 28,200 25,600
#DIV/0! -
#DIV/0! #DIV/0! 14,050 14,050 14,050 14,050 12,700
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 32,000 32,000 32,000 32,000 29,000
#DIV/0! #DIV/0! 7,750 7,750 7,750 7,750 7,000
#DIV/0! #DIV/0! 20,550 20,550 20,550 20,550 18,600
#DIV/0! #DIV/0! 123,895,350 123,895,350 123,895,350 123,895,350 112,632,100
#DIV/0! #DIV/0! 116,607,500 116,607,500 116,607,500 116,607,500 106,006,800
#DIV/0! #DIV/0! 5,830,300 5,830,300 5,830,300 5,830,300 5,300,200
#DIV/0! #DIV/0! 55,971,600 55,971,600 55,971,600 55,971,600 50,883,200
#DIV/0! #DIV/0! 106,345,950 106,345,950 106,345,950 106,345,950 96,678,100
#DIV/0! #DIV/0! 1,415,150 1,415,150 1,415,150 1,415,150 1,286,500
#DIV/0! #DIV/0! 163,150 163,150 163,150 163,150 148,300
#DIV/0! #DIV/0! 93,532,200 93,532,200 93,532,200 93,532,200 85,029,200
#DIV/0! #DIV/0! 57,915,150 57,915,150 57,915,150 57,915,150 52,650,100
#DIV/0! #DIV/0! 46,162,600 46,162,600 46,162,600 46,162,600 41,966,000
#DIV/0! #DIV/0! 34,632,450 34,632,450 34,632,450 34,632,450 31,484,000
#DIV/0! #DIV/0! 36,775,050 36,775,050 36,775,050 36,775,050 33,431,800
#DIV/0! #DIV/0! 50,345,250 50,345,250 50,345,250 50,345,250 45,768,400
#DIV/0! #DIV/0! 8,075,000 8,075,000 8,075,000 8,075,000 7,340,900
#DIV/0! #DIV/0! 6,879,900 6,879,900 6,879,900 6,879,900 6,254,400
#DIV/0! #DIV/0! 7,594,100 7,594,100 7,594,100 7,594,100 6,903,700
#DIV/0! #DIV/0! 10,450,950 10,450,950 10,450,950 10,450,950 9,500,800
#DIV/0! #DIV/0! 13,371,950 13,371,950 13,371,950 13,371,950 12,156,300
#DIV/0! #DIV/0! 14,657,450 14,657,450 14,657,450 14,657,450 13,324,900
#DIV/0! #DIV/0! 25,915,950 25,915,950 25,915,950 25,915,950 23,559,900
#DIV/0! #DIV/0! 1,317,600 1,317,600 1,317,600 1,317,600 1,197,800
#DIV/0! #DIV/0! 38,866,350 38,866,350 38,866,350 38,866,350 35,333,000
#DIV/0! -
#DIV/0! -
#DIV/0! -
#DIV/0! #DIV/0! 41,650 41,650 41,650 41,650 37,800
#DIV/0! -
#DIV/0! #DIV/0! 116,550 116,550 116,550 116,550 105,900
#DIV/0! #DIV/0! 8,700 8,700 8,700 8,700 7,900
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 3,039,000 3,039,000 3,039,000 3,039,000 2,762,700
#DIV/0! -
#DIV/0! #DIV/0! 44,400 44,400 44,400 44,400 40,300
#DIV/0! #DIV/0! 17,600 17,600 17,600 17,600 16,000
#DIV/0! #DIV/0! 421,250 421,250 421,250 421,250 382,900
#DIV/0! #DIV/0! 23,100 23,100 23,100 23,100 21,000
#DIV/0! #DIV/0! 3,850 3,850 3,850 3,850 3,500
#DIV/0! #DIV/0! 190,950 190,950 190,950 190,950 173,500
#DIV/0! #DIV/0! 291,450 291,450 291,450 291,450 264,900
#DIV/0! #DIV/0! 205,150 205,150 205,150 205,150 186,500
#DIV/0! -
#DIV/0! -
#DIV/0! #DIV/0! 3,300 3,300 3,300 3,300 3,000
#DIV/0! #DIV/0! 14,400 14,400 14,400 14,400 13,000
#DIV/0! #DIV/0! 825,200 825,200 825,200 825,200 750,100
#DIV/0! #DIV/0! 97,000 97,000 97,000 97,000 88,100
#DIV/0! #DIV/0! 46,100 46,100 46,100 46,100 41,900
#DIV/0! #DIV/0! 3,400 3,400 3,400 3,400 3,000
#DIV/0! #DIV/0! 2,200 2,200 2,200 2,200 2,000
#DIV/0! #DIV/0! 2,200 2,200 2,200 2,200 2,000
#DIV/0! -
#DIV/0! -
#DIV/0! #DIV/0! 183,300 183,300 183,300 183,300 166,600
#DIV/0! #DIV/0! 244,300 244,300 244,300 244,300 222,000
#DIV/0! #DIV/0! 305,400 305,400 305,400 305,400 277,600
#DIV/0! #DIV/0! 244,300 244,300 244,300 244,300 222,000
#DIV/0! #DIV/0! 305,400 305,400 305,400 305,400 277,600
#DIV/0! #DIV/0! 366,500 366,500 366,500 366,500 333,100
#DIV/0! -
#DIV/0! #DIV/0! 233,200 233,200 233,200 233,200 212,000
#DIV/0! #DIV/0! 145,800 145,800 145,800 145,800 132,500
#DIV/0! #DIV/0! 40,300 40,300 40,300 40,300 36,600
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 427,200 427,200 427,200 427,200 388,300
#DIV/0! #DIV/0! 487,500 487,500 487,500 487,500 443,100
#DIV/0! #DIV/0! 730,250 730,250 730,250 730,250 663,800
#DIV/0! #DIV/0! 846,050 846,050 846,050 846,050 769,100
#DIV/0! #DIV/0! 991,500 991,500 991,500 991,500 901,300
#DIV/0! #DIV/0! 18,190,800 18,190,800 18,190,800 18,190,800 16,537,000
#DIV/0! #DIV/0! 27,286,100 27,286,100 27,286,100 27,286,100 24,805,500
#DIV/0! #DIV/0! 36,381,550 36,381,550 36,381,550 36,381,550 33,074,100
#DIV/0! #DIV/0! 45,476,850 45,476,850 45,476,850 45,476,850 41,342,500
#DIV/0! #DIV/0! 63,667,650 63,667,650 63,667,650 63,667,650 57,879,600
#DIV/0! #DIV/0! 72,763,000 72,763,000 72,763,000 72,763,000 66,148,100
#DIV/0! #DIV/0! 1,982,250 1,982,250 1,982,250 1,982,250 1,802,000
#DIV/0! #DIV/0! 3,964,650 3,964,650 3,964,650 3,964,650 3,604,200
#DIV/0! #DIV/0! 7,929,250 7,929,250 7,929,250 7,929,250 7,208,400
#DIV/0! #DIV/0! 9,911,650 9,911,650 9,911,650 9,911,650 9,010,500
#DIV/0! #DIV/0! 320,650 320,650 320,650 320,650 291,500
#DIV/0! #DIV/0! 349,850 349,850 349,850 349,850 318,000
#DIV/0! #DIV/0! 408,100 408,100 408,100 408,100 371,000
#DIV/0! #DIV/0! 408,100 408,100 408,100 408,100 371,000
#DIV/0! #DIV/0! 583,050 583,050 583,050 583,050 530,000
#DIV/0! -
#DIV/0! #DIV/0! ### ### ### ### ###
#DIV/0! #DIV/0! ### ### ### ### ###
#DIV/0! #DIV/0! 84,540,400 84,540,400 84,540,400 84,540,400 76,854,900
#DIV/0! #DIV/0! ### ### ### ### ###
#DIV/0! #DIV/0! 74,628,750 74,628,750 74,628,750 74,628,750 67,844,300
#DIV/0! #DIV/0! 139,023,750 139,023,750 139,023,750 139,023,750 126,385,200
#DIV/0! #DIV/0! 474,592,400 474,592,400 474,592,400 474,592,400 431,447,600
#DIV/0! #DIV/0! 215,723,750 215,723,750 215,723,750 215,723,750 196,112,500
#DIV/0! #DIV/0! 269,363,200 269,363,200 269,363,200 269,363,200 244,875,600
#DIV/0! #DIV/0! 658,832,150 658,832,150 658,832,150 658,832,150 598,938,300
#DIV/0! #DIV/0! 177,779,700 177,779,700 177,779,700 177,779,700 161,617,900
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 146,932,650 146,932,650 146,932,650 146,932,650 133,575,100
#DIV/0! #DIV/0! ### ### ### ### ###
#DIV/0! #DIV/0! 815,435,950 815,435,950 815,435,950 815,435,950 741,305,400
#DIV/0! #DIV/0! 650,232,000 650,232,000 650,232,000 650,232,000 591,120,000
#DIV/0! #DIV/0! 301,686,800 301,686,800 301,686,800 301,686,800 274,260,700
#DIV/0! #DIV/0! 520,787,400 520,787,400 520,787,400 520,787,400 473,443,000
#DIV/0! #DIV/0! 755,612,300 755,612,300 755,612,300 755,612,300 686,920,200
#DIV/0! #DIV/0! 320,670,500 320,670,500 320,670,500 320,670,500 291,518,600
#DIV/0! #DIV/0! 11,825,100 11,825,100 11,825,100 11,825,100 10,750,000
#DIV/0! #DIV/0! ### ### ### ### ###
#DIV/0! #DIV/0! 9,266,000 9,266,000 9,266,000 9,266,000 8,423,600
#DIV/0! #DIV/0! 183,166,900 183,166,900 183,166,900 183,166,900 166,515,300
#DIV/0! #DIV/0! 79,817,850 79,817,850 79,817,850 79,817,850 72,561,600
#DIV/0! #DIV/0! 18,947,000 18,947,000 18,947,000 18,947,000 17,224,500
#DIV/0! #DIV/0! 57,137,600 57,137,600 57,137,600 57,137,600 51,943,200
#DIV/0! #DIV/0! ### ### ### ### 954,061,000
#DIV/0! #DIV/0! 367,500,000 367,500,000 367,500,000 367,500,000 334,090,900
#DIV/0! #DIV/0! 52,500,000 52,500,000 52,500,000 52,500,000 47,727,200
#DIV/0! #DIV/0! 34,996,500 34,996,500 34,996,500 34,996,500 31,815,000
#DIV/0! #DIV/0! 840,000,000 840,000,000 840,000,000 840,000,000 763,636,300
#DIV/0! #DIV/0! 105,000,000 105,000,000 105,000,000 105,000,000 95,454,500
#DIV/0! #DIV/0! 210,000 210,000 210,000 210,000 190,900
#DIV/0! #DIV/0! 1,050,000 1,050,000 1,050,000 1,050,000 954,500
#DIV/0! #DIV/0! 26,250,000 26,250,000 26,250,000 26,250,000 23,863,600
#DIV/0! #DIV/0! 5,775,000 5,775,000 5,775,000 5,775,000 5,250,000
#DIV/0! #DIV/0! 6,825,000 6,825,000 6,825,000 6,825,000 6,204,500
#DIV/0! #DIV/0! 1,312,500 1,312,500 1,312,500 1,312,500 1,193,100
#DIV/0! #DIV/0! 13,125,000 13,125,000 13,125,000 13,125,000 11,931,800
#DIV/0! #DIV/0! 10,500,000 10,500,000 10,500,000 10,500,000 9,545,400
#DIV/0! #DIV/0! 13,650,000 13,650,000 13,650,000 13,650,000 12,409,000
#DIV/0! #DIV/0! 7,350,000 7,350,000 7,350,000 7,350,000 6,681,800
#DIV/0! #DIV/0! 38,850,000 38,850,000 38,850,000 38,850,000 35,318,100
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! -
#DIV/0! #DIV/0! 34,960,900 34,960,900 34,960,900 34,960,900 31,782,600
#DIV/0! #DIV/0! 15,849,000 15,849,000 15,849,000 15,849,000 14,408,100
#DIV/0! #DIV/0! 43,453,200 43,453,200 43,453,200 43,453,200 39,502,900
#DIV/0! #DIV/0! 7,647,150 7,647,150 7,647,150 7,647,150 6,951,900
#DIV/0! #DIV/0! 22,440,450 22,440,450 22,440,450 22,440,450 20,400,400
#DIV/0! #DIV/0! 28,663,600 28,663,600 28,663,600 28,663,600 26,057,800
#DIV/0! #DIV/0! 2,157,200 2,157,200 2,157,200 2,157,200 1,961,000
#DIV/0! #DIV/0! 192,450 192,450 192,450 192,450 174,900
#DIV/0! #DIV/0! 844,300 844,300 844,300 844,300 767,500
#DIV/0! #DIV/0! 6,355,100 6,355,100 6,355,100 6,355,100 5,777,300
#DIV/0! #DIV/0! 10,057,300 10,057,300 10,057,300 10,057,300 9,143,000
#DIV/0! #DIV/0! 122,437,750 122,437,750 122,437,750 122,437,750 111,307,000
#DIV/0! #DIV/0! 14,226,100 14,226,100 14,226,100 14,226,100 12,932,800
#DIV/0! -
#DIV/0! #DIV/0! 408,100 408,100 408,100 408,100 371,000
#DIV/0! #DIV/0! 15,000 15,000 15,000 15,000 13,600
#DIV/0! #DIV/0! 5,650 #DIV/0! #DIV/0! 5,650 #DIV/0!
#DIV/0! #DIV/0! 20,000 #DIV/0! #DIV/0! 20,000 #DIV/0!
#DIV/0! #DIV/0! 83,850 #DIV/0! #DIV/0! 83,850 #DIV/0!
#DIV/0! #DIV/0! 100,550 #DIV/0! #DIV/0! 100,550 #DIV/0!
#DIV/0! #DIV/0! 40,300 40,300 40,300 40,300 36,600
#DIV/0! #DIV/0! 2,400 2,400 2,400 2,400 2,100
#DIV/0! #DIV/0! 47,250 47,250 47,250 47,250 42,900
#DIV/0! #DIV/0! 44,900 44,900 44,900 44,900 40,800
#DIV/0! #DIV/0! 40,300 40,300 40,300 40,300 36,600
#DIV/0! #DIV/0! 38,500 38,500 38,500 38,500 35,000
#DIV/0! #DIV/0! 35,250 35,250 35,250 35,250 32,000
#DIV/0! #DIV/0! 32,000 32,000 32,000 32,000 29,000
#DIV/0! #DIV/0! 64,350 64,350 64,350 64,350 58,500
#DIV/0! #DIV/0! 209,150 209,150 209,150 209,150 190,100
#DIV/0! #DIV/0! 35,250 35,250 35,250 35,250 32,000
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 48,150 48,150 48,150 48,150 43,700
#DIV/0! #DIV/0! 1,528,650 1,528,650 1,528,650 1,528,650 1,389,600
#DIV/0! #DIV/0! 75,600 75,600 75,600 75,600 68,700
#DIV/0! #DIV/0! 70,850 70,850 70,850 70,850 64,400
#DIV/0! #DIV/0! 24,250 #DIV/0! #DIV/0! 24,250 #DIV/0!
#DIV/0! #DIV/0! 649,400 #DIV/0! #DIV/0! 649,400 #DIV/0!
#DIV/0! #DIV/0! 643,750 643,750 643,750 643,750 585,200
#DIV/0! #DIV/0! 1,106,250 1,106,250 1,106,250 1,106,250 1,005,600
#DIV/0! #DIV/0! 147,200 147,200 147,200 147,200 133,800
#DIV/0! #DIV/0! 4,693,350 4,693,350 4,693,350 4,693,350 4,266,600
#DIV/0! #DIV/0! 502,950 502,950 502,950 502,950 457,200
#DIV/0! #DIV/0! 301,650 301,650 301,650 301,650 274,200
#DIV/0! #DIV/0! 705,350 705,350 705,350 705,350 641,200
#DIV/0! #DIV/0! 897,850 897,850 897,850 897,850 816,200
#DIV/0! #DIV/0! 114,450 #DIV/0! #DIV/0! 114,450 #DIV/0!
#DIV/0! #DIV/0! 320,650 #DIV/0! 285,000 285,000 #DIV/0!
#DIV/0! #DIV/0! 101,850 #DIV/0! 90,000 90,000 76,500
#DIV/0! #DIV/0! 43,550 #DIV/0! #DIV/0! 43,550 #DIV/0!
#DIV/0! #DIV/0! 42,800 42,800 42,800 42,800 38,900
#DIV/0! #DIV/0! 42,800 #DIV/0! #DIV/0! 42,800 36,600
#DIV/0! #DIV/0! 3,356,400 3,356,400 3,356,400 3,356,400 3,051,200
#DIV/0! #DIV/0! 47,000 47,000 47,000 47,000 42,700
#DIV/0! #DIV/0! 53,550 53,550 53,550 53,550 48,600
#DIV/0! #DIV/0! 50,150 #DIV/0! #DIV/0! 50,150 #DIV/0!
#DIV/0! #DIV/0! 201,150 201,150 201,150 201,150 182,800
#DIV/0! #DIV/0! 1,408,150 #DIV/0! #DIV/0! 1,782,500 #DIV/0!
#DIV/0! #DIV/0! 44,300 44,300 44,300 44,300 40,200
#DIV/0! #DIV/0! 15,200 15,200 15,200 15,200 13,800
#DIV/0! #DIV/0! 2,500 2,500 2,500 2,500 2,200
#DIV/0! #DIV/0! 17,500 17,500 17,500 17,500 15,900
#DIV/0! #DIV/0! 205,150 205,150 205,150 205,150 186,500
#DIV/0! #DIV/0! 329,700 329,700 329,700 329,700 299,700
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 481,100 481,100 481,100 481,100 437,300
#DIV/0! #DIV/0! 20,450 20,450 20,450 20,450 18,500
#DIV/0! #DIV/0! 1,166,000 1,166,000 1,166,000 1,166,000 1,060,000
#DIV/0! #DIV/0! 1,166,000 1,166,000 1,166,000 1,166,000 1,060,000
#DIV/0! #DIV/0! 583,050 583,050 583,050 583,050 530,000
#DIV/0! #DIV/0! 16,350 16,350 16,350 16,350 14,800
#DIV/0! #DIV/0! 21,000 21,000 21,000 21,000 19,000
#DIV/0! #DIV/0! 25,600 25,600 25,600 25,600 23,200
#DIV/0! #DIV/0! 105,000 105,000 105,000 105,000 95,400
#DIV/0! #DIV/0! 524,650 524,650 524,650 524,650 476,900
#DIV/0! #DIV/0! 285,700 285,700 285,700 285,700 259,700
#DIV/0! #DIV/0! 524,650 #DIV/0! #DIV/0! 524,650 #DIV/0!
#DIV/0! #DIV/0! 291,450 #DIV/0! #DIV/0! 291,450 233,000
#DIV/0! #DIV/0! 151,600 #DIV/0! #DIV/0! 151,600 #DIV/0!
#DIV/0! #DIV/0! 157,350 #DIV/0! #DIV/0! 157,350 #DIV/0!
#DIV/0! #DIV/0! 262,350 #DIV/0! #DIV/0! 262,350 #DIV/0!
#DIV/0! #DIV/0! 87,450 #DIV/0! #DIV/0! 87,450 #DIV/0!
#DIV/0! #DIV/0! 145,800 #DIV/0! #DIV/0! 145,800 #DIV/0!
#DIV/0! #DIV/0! 204,000 300,000 300,000 300,000 #DIV/0!
#DIV/0! #DIV/0! 215,750 215,750 215,750 215,750 196,100
#DIV/0! #DIV/0! 101,850 #DIV/0! #DIV/0! 101,850 #DIV/0!
#DIV/0! #DIV/0! 2,915,200 2,915,200 2,915,200 2,915,200 2,650,100
#DIV/0! #DIV/0! 87,450 87,450 87,450 87,450 79,500
#DIV/0! #DIV/0! 40,800 40,800 40,800 40,800 37,000
#DIV/0! #DIV/0! 52,350 52,350 52,350 52,350 47,500
#DIV/0! #DIV/0! 320,650 320,650 320,650 320,650 291,500
#DIV/0! #DIV/0! 874,500 874,500 874,500 874,500 795,000
#DIV/0! #DIV/0! 874,500 874,500 874,500 874,500 795,000
#DIV/0! #DIV/0! 495,600 495,600 495,600 495,600 450,500
#DIV/0! #DIV/0! 419,750 419,750 419,750 419,750 381,500
#DIV/0! #DIV/0! 577,150 577,150 577,150 577,150 524,600
#DIV/0! #DIV/0! 693,800 693,800 693,800 693,800 630,700
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 495,600 495,600 495,600 495,600 450,500
#DIV/0! #DIV/0! 489,700 489,700 489,700 489,700 445,100
#DIV/0! #DIV/0! 105,600 105,600 105,600 105,600 96,000
#DIV/0! #DIV/0! 37,350 37,350 37,350 37,350 33,900
#DIV/0! #DIV/0! 37,350 37,350 37,350 37,350 33,900
#DIV/0! #DIV/0! 6,900 6,900 6,900 6,900 6,200
#DIV/0! #DIV/0! 11,550 11,550 11,550 11,550 10,500
#DIV/0! #DIV/0! 1,399,200 1,399,200 1,399,200 1,399,200 1,272,000
#DIV/0! #DIV/0! 1,865,700 1,865,700 1,865,700 1,865,700 1,696,000
#DIV/0! #DIV/0! 104,450 104,450 104,450 104,450 94,900
#DIV/0! #DIV/0! 8,050 8,050 8,050 8,050 7,300
#DIV/0! #DIV/0! 200 200 200 200 200
#DIV/0! #DIV/0! 186,550 #DIV/0! 186,550 186,550 #DIV/0!
#DIV/0! #DIV/0! 113,700 113,700 113,700 113,700 103,300
#DIV/0! #DIV/0! 33,900 33,900 33,900 33,900 30,800
#DIV/0! #DIV/0! 66,450 66,450 66,450 66,450 60,400
#DIV/0! #DIV/0! 60,150 60,150 60,150 60,150 54,600
#DIV/0! #DIV/0! 214,600 214,600 214,600 214,600 195,000
#DIV/0! #DIV/0! 31,350 31,350 31,350 31,350 28,500
#DIV/0! #DIV/0! 110,000 #DIV/0! 110,000 110,000 96,000
#DIV/0! #DIV/0! 160,000 #DIV/0! 160,000 160,000 143,000
#DIV/0! #DIV/0! 300,000 #DIV/0! 300,000 300,000 262,000
#DIV/0! #DIV/0! 15 15 15 15
#DIV/0! #DIV/0! 18,650 18,650 18,650 18,650 16,900
#DIV/0! #DIV/0! 8,700 8,700 8,700 8,700 7,900
#DIV/0! #DIV/0! harga pemerint harga pemerint harga pemerint harga pemerint harga pemerintah
#DIV/0! #DIV/0! 105,000 105,000 105,000 105,000 95,400
#DIV/0! #DIV/0! 346,500 346,500 346,500 346,500 315,000
#DIV/0! #DIV/0! 10,250 10,250 10,250 10,250 9,300
#DIV/0! #DIV/0! 145,800 145,800 145,800 145,800 132,500
#DIV/0! #DIV/0! 87,450 87,450 87,450 87,450 79,500
#DIV/0! #DIV/0! 62,550 62,550 62,550 62,550 56,800
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 14,050 14,050 14,050 14,050 12,700
#DIV/0! #DIV/0! 20,450 20,450 20,450 20,450 18,500
#DIV/0! #DIV/0! 180,700 180,700 180,700 180,700 164,200
#DIV/0! #DIV/0! 1,650 1,650 1,650 1,650 1,500
#DIV/0! #DIV/0! 21,600 21,600 21,600 21,600 19,600
#DIV/0! #DIV/0! 4,900 4,900 4,900 4,900 4,400
#DIV/0! #DIV/0! 700 700 700 700 600
#DIV/0! #DIV/0! 22,750 22,750 22,750 22,750 20,600
#DIV/0! #DIV/0! 423,250 423,250 423,250 423,250 384,700
#DIV/0! #DIV/0! 423,250 423,250 423,250 423,250 384,700
#DIV/0! #DIV/0! 1,418,300 1,418,300 1,418,300 1,418,300 1,289,300
#DIV/0! #DIV/0! 315,800 315,800 315,800 315,800 287,000
#DIV/0! #DIV/0! 408,100 408,100 408,100 408,100 371,000
#DIV/0! #DIV/0! 466,400 466,400 466,400 466,400 424,000
#DIV/0! #DIV/0! 87,450 87,450 87,450 87,450 79,500
#DIV/0! #DIV/0! 2,565,350 2,565,350 2,565,350 2,565,350 2,332,100
#DIV/0! #DIV/0! 5,323,500 5,323,500 5,323,500 5,323,500 4,839,500
#DIV/0! #DIV/0! 3,206,700 3,206,700 3,206,700 3,206,700 2,915,100
#DIV/0! -
#DIV/0! -
#DIV/0! #DIV/0! 3,206,700 3,206,700 3,206,700 3,206,700 2,915,100
#DIV/0! -
#DIV/0! -
#DIV/0! #DIV/0! 2,623,600 2,623,600 2,623,600 2,623,600 2,385,000
#DIV/0! -
#DIV/0! -
#DIV/0! -
#DIV/0! -
#DIV/0! -
#DIV/0! -
#DIV/0! #DIV/0! 2,623,600 2,623,600 2,623,600 2,623,600 2,385,000
#DIV/0! -
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! -
#DIV/0! -
#DIV/0! -
#DIV/0! #DIV/0! 964,650 964,650 964,650 964,650 876,900
#DIV/0! #DIV/0! 179,150 179,150 179,150 179,150 162,800
#DIV/0! #DIV/0! 3,445,300 3,445,300 3,445,300 3,445,300 3,132,000
#DIV/0! #DIV/0! 2,048,250 2,048,250 2,048,250 2,048,250 1,862,000
#DIV/0! #DIV/0! 735,000 735,000 735,000 735,000 668,100
#DIV/0! #DIV/0! 6,700 6,700 6,700 6,700 6,000
#DIV/0! #DIV/0! 10,050 10,050 10,050 10,050 9,100
#DIV/0! #DIV/0! 22,150 22,150 22,150 22,150 20,100
#DIV/0! #DIV/0! 22,150 22,150 22,150 22,150 20,100
#DIV/0! #DIV/0! 20,650 20,650 20,650 20,650 18,700
#DIV/0! #DIV/0! 20,650 20,650 20,650 20,650 18,700
#DIV/0! #DIV/0! 20,050 20,050 20,050 20,050 18,200
#DIV/0! #DIV/0! 9,450 9,450 9,450 9,450 8,500
#DIV/0! #DIV/0! 73,800 73,800 73,800 73,800 67,000
#DIV/0! #DIV/0! 30,200 30,200 30,200 30,200 27,400
#DIV/0! #DIV/0! 75,700 75,700 75,700 75,700 68,800
#DIV/0! #DIV/0! 40,800 40,800 40,800 40,800 37,000
#DIV/0! #DIV/0! 40,300 40,300 40,300 40,300 36,600
#DIV/0! #DIV/0! 41,550 41,550 41,550 41,550 37,700
#DIV/0! #DIV/0! 18,750 18,750 18,750 18,750 17,000
#DIV/0! #DIV/0! 56,250 56,250 56,250 56,250 51,100
#DIV/0! #DIV/0! 26,750 26,750 26,750 26,750 24,300
#DIV/0! #DIV/0! 67,050 67,050 67,050 67,050 60,900
#DIV/0! #DIV/0! 88,500 88,500 88,500 88,500 80,400
#DIV/0! #DIV/0! 77,050 77,050 77,050 77,050 70,000
#DIV/0! #DIV/0! 97,200 97,200 97,200 97,200 88,300
#DIV/0! #DIV/0! 107,300 107,300 107,300 107,300 97,500
#DIV/0! #DIV/0! 73,800 73,800 73,800 73,800 67,000
#DIV/0! #DIV/0! 26,750 26,750 26,750 26,750 24,300
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 80,500 80,500 80,500 80,500 73,100
#DIV/0! #DIV/0! 301,650 301,650 301,650 301,650 274,200
#DIV/0! #DIV/0! 57,000 57,000 57,000 57,000 51,800
#DIV/0! #DIV/0! 14,700 14,700 14,700 14,700 13,300
#DIV/0! #DIV/0! 5,450 5,450 5,450 5,450 4,900
#DIV/0! #DIV/0! 1,609,200 1,609,200 1,609,200 1,609,200 1,462,900
#DIV/0! #DIV/0! 40,300 40,300 40,300 40,300 36,600
#DIV/0! #DIV/0! 20,050 20,050 20,050 20,050 18,200
#DIV/0! #DIV/0! 2,625,000 2,625,000 2,625,000 2,625,000 2,386,300
#DIV/0! #DIV/0! 380,600 380,600 380,600 380,600 346,000
#DIV/0! #DIV/0! 360,900 360,900 360,900 360,900 328,000
#DIV/0! #DIV/0! 5,250,000 5,250,000 5,250,000 5,250,000 4,772,700
#DIV/0! #DIV/0! 997,500 997,500 997,500 997,500 906,800
#DIV/0! -
#DIV/0! #DIV/0! 23,625,000 23,625,000 23,625,000 23,625,000 21,477,200
#DIV/0! #DIV/0! 262,500 262,500 262,500 262,500 238,600
#DIV/0! #DIV/0! 525,000 525,000 525,000 525,000 477,200
#DIV/0! #DIV/0! 393,750 393,750 393,750 393,750 357,900
#DIV/0! #DIV/0! 3,281,250 3,281,250 3,281,250 3,281,250 2,982,900
#DIV/0! #DIV/0! 1,706,250 1,706,250 1,706,250 1,706,250 1,551,100
#DIV/0! #DIV/0! 3,675,000 3,675,000 3,675,000 3,675,000 3,340,900
#DIV/0! -
#DIV/0! #DIV/0! 6,570,750 6,570,750 6,570,750 6,570,750 5,973,400
#DIV/0! #DIV/0! 7,911,850 7,911,850 7,911,850 7,911,850 7,192,500
#DIV/0! #DIV/0! 9,118,600 9,118,600 9,118,600 9,118,600 8,289,600
#DIV/0! #DIV/0! 10,714,500 10,714,500 10,714,500 10,714,500 9,740,400
#DIV/0! #DIV/0! 9,520,950 9,520,950 9,520,950 9,520,950 8,655,400
#DIV/0! #DIV/0! 13,275,750 13,275,750 13,275,750 13,275,750 12,068,800
#DIV/0! -
#DIV/0! #DIV/0! 4,291,100 4,291,100 4,291,100 4,291,100 3,901,000
#DIV/0! #DIV/0! 5,028,750 5,028,750 5,028,750 5,028,750 4,571,500
#DIV/0! -
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 5,247,350 5,247,350 5,247,350 5,247,350 4,770,300
#DIV/0! #DIV/0! 1,749,050 1,749,050 1,749,050 1,749,050 1,590,000
#DIV/0! #DIV/0! 1,166,000 1,166,000 1,166,000 1,166,000 1,060,000
#DIV/0! #DIV/0! 3,206,700 3,206,700 3,206,700 3,206,700 2,915,100
#DIV/0! #DIV/0! 1,166,000 1,166,000 1,166,000 1,166,000 1,060,000
#DIV/0! #DIV/0! 1,166,000 1,166,000 1,166,000 1,166,000 1,060,000
#DIV/0! #DIV/0! 1,049,450 1,049,450 1,049,450 1,049,450 954,000
#DIV/0! #DIV/0! 1,049,450 1,049,450 1,049,450 1,049,450 954,000
#DIV/0! #DIV/0! 874,500 874,500 874,500 874,500 795,000
#DIV/0! #DIV/0! 5,830,300 5,830,300 5,830,300 5,830,300 5,300,200
#DIV/0! #DIV/0! 2,332,150 2,332,150 2,332,150 2,332,150 2,120,100
#DIV/0! #DIV/0! 408,100 408,100 408,100 408,100 371,000
#DIV/0! -
#DIV/0! #DIV/0! 14,050 14,050 14,050 14,050 12,700
#DIV/0! #DIV/0! 17,500 17,500 17,500 17,500 15,900
#DIV/0! #DIV/0! 26,750 26,750 26,750 26,750 24,300
#DIV/0! #DIV/0! 35,050 35,050 35,050 35,050 31,800
#DIV/0! #DIV/0! 81,650 81,650 81,650 81,650 74,200
#DIV/0! #DIV/0! 151,600 151,600 151,600 151,600 137,800
#DIV/0! #DIV/0! 174,900 174,900 174,900 174,900 159,000
#DIV/0! #DIV/0! 11,000 11,000 11,000 11,000 10,000
#DIV/0! #DIV/0! 699,600 699,600 699,600 699,600 636,000
#DIV/0! #DIV/0! 5,830,300 5,830,300 5,830,300 5,830,300 5,300,200
#DIV/0! -
#DIV/0! #DIV/0! 2,915,200 2,915,200 2,915,200 2,915,200 2,650,100
#DIV/0! #DIV/0! 5,713,750 5,713,750 5,713,750 5,713,750 5,194,300
#DIV/0! -
#DIV/0! -
#DIV/0! #DIV/0! 209,850 209,850 209,850 209,850 190,700
#DIV/0! #DIV/0! 81,650 81,650 81,650 81,650 74,200
#DIV/0! #DIV/0! 69,900 69,900 69,900 69,900 63,500
#DIV/0! #DIV/0! 349,850 349,850 349,850 349,850 318,000
NDEN RATA2 RATA2 + Standar Harga HPS Standar Harga RAB RAB ADD
3 keuntungan (Perbub) & Usulan PU Perencanaan +Swakelola
#DIV/0! #DIV/0! 408,100 408,100 408,100 408,100 371,000
#DIV/0! #DIV/0! 1,010,200 1,010,200 1,010,200 1,010,200 918,300
#DIV/0! #DIV/0! 57,300 57,300 57,300 57,300 52,000
#DIV/0! #DIV/0! 145,800 145,800 145,800 145,800 132,500
#DIV/0! #DIV/0! 298,800 298,800 298,800 298,800 271,600
#DIV/0! #DIV/0! 15,392,150 15,392,150 15,392,150 15,392,150 13,992,800
#DIV/0! -
#DIV/0! -
#DIV/0! #DIV/0! 6,360,450 6,360,450 6,360,450 6,360,450 5,782,200
#DIV/0! #DIV/0! 2,332,150 2,332,150 2,332,150 2,332,150 2,120,100
#DIV/0! #DIV/0! 1,325,100 1,325,100 1,325,100 1,325,100 1,204,600
#DIV/0! -
#DIV/0! #DIV/0! 3,250 3,250 3,250 3,250 2,900
#DIV/0! #DIV/0! 3,250 3,250 3,250 3,250 2,900
#DIV/0! #DIV/0! 3,250 3,250 3,250 3,250 2,900
#DIV/0! #DIV/0! 477,100 477,100 477,100 477,100 433,700
#DIV/0! #DIV/0! 185,400 185,400 185,400 185,400 168,500
#DIV/0! #DIV/0! 105,000 105,000 105,000 105,000 95,400
#DIV/0! #DIV/0! 105,000 105,000 105,000 105,000 95,400
#DIV/0! #DIV/0! 37,050 37,050 37,050 37,050 33,600
#DIV/0! #DIV/0! 68,850 68,850 68,850 68,850 62,500
#DIV/0! #DIV/0! 159,050 159,050 159,050 159,050 144,500
#DIV/0! #DIV/0! 106,050 106,050 106,050 106,050 96,400
#DIV/0! -
#DIV/0! #DIV/0! 63,600 63,600 63,600 63,600 57,800
#DIV/0! #DIV/0! 583,050 583,050 583,050 583,050 530,000
#DIV/0! #DIV/0! 583,050 583,050 583,050 583,050 530,000
#DIV/0! #DIV/0! 5,830,300 5,830,300 5,830,300 5,830,300 5,300,200
#DIV/0! #DIV/0! 1,775,650 1,775,650 1,775,650 1,775,650 1,614,200
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN TAHUN
ANGGARAN
DINAS PEKERJAAN UMUM 2014
BINA MARGA, CIPTA KARYA & TATA RUANG
KABUPATEN BANYUWANGI

NO HARGA
SATUAN
A I. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN (SNI 03 - 2835 -2002)
1 1 m' Pagar sementara dari kayu tinggi 2 meter 318,400.00
2 1m' Pemagaran daerah kerja tiang kayu 273,760.00
3 1m' Pemagaran daerah kerja tiang besi siku 273,050.00
4 1 m' Pagar sementara dari seng gelombang tinggi 2 meter 420,260.00
5 1 m' Pengukuran dan Pemasangan bouwplank 92,640.00
6 1 m2 Pembuatan kantor sementara, dengan lantai plesteran 1,241,560.00
7 1 m2 Pembuatan gudang semen dan alat - alat 1,161,780.00
8 1 m2 Pembuatan rumah jaga / konstruksi kayu 1,312,280.00
9 1 m2 Pembuatan direksi keet, los kerja dan gudang 576,110.00
10 1 m2 Membersihkan lapangan dan peralatan 10,500.00
11 1 m2 Pembuatan bedeng buruh 1,168,010.00
12 1 m2 Pembuatan bak adukan ukuran ( 40 x 50 x 20 ) cm 142,650.00
13 1 m2 Pembuatan stegger dari bambu, ukuran ( 40 x 50 x 20 ) cm 68,150.00
14 1 m2 Pembuatan jalan sementara 106,860.00
15 1 m3 Bongkaran beton bertulang 859,980.00
16 1 m3 Bongkaran dinding tembok bata merah 429,990.00
17 1m3 Bongkar beton dengan Jack Hammer 152,000.00

B II. ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH (SNI 2835 : 2008)


1 Menggali 1 m3 tanah biasa sedalam 1 meter 47,250.00
2 Menggali 1 m3 tanah biasa sedalam 2 meter 58,050.00
3 Menggali 1 m3 tanah biasa sedalam 3 meter 69,030.00
4 Menggali 1 m3 tanah keras sedalam 1 meter 62,880.00
5 Menggali 1 m3 tanah cadas sedalam 1 meter 95,400.00
6 Menggali 1 m3 tanah lumpur sedalam 1 meter 76,050.00
7 Mengerjakan 1 m2 stripping tebing setinggi 1 meter 3,450.00
8 Membuang 1 m3 tanah sejauh 15 meter 20,700.00
9 Mengurug kembali 1 m3 galian tanah biasa sedalam 1 meter 15,750.00
10 Mengurug kembali 1 m3 galian tanah biasa sedalam 2 meter 19,350.00
11 Mengurug kembali 1 m3 galian tanah biasa sedalam 3 meter 23,010.00
12 Mengurug kembali 1 m3 galian tanah cadas sedalam 1 meter 31,800.00
13 Mengurug kembali 1 m3 galian tanah lumpur sedalam 1 meter 25,350.00
14 Memadatkan 1 m3 tanah (per 20 cm) 34,500.00
15 Mengurug 1 m3 pasir urug 198,900.00
16 Memasang 1 m3 Lapisan pudel campuran 1 KP : 3 PP : 7 TL 304,260.00
17 Memasang 1 m3 Lapisan pudel campuran 1 KP : 5 TL 303,700.00
18 Memasang 1 m2 lapisan ijuk tebal 10 cm 129,150.00
19 Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan 172,050.00
NO HARGA
SATUAN
20 Mengurug 1 m3 Tanah Urug 128,850.00
21 Timbunan tanah menggunakan buldozer 440,000.00
22 Galian tanah menggunakan excavator 622,800.00
23 Biaya operasional dump truck (mengangkut material tanah,jarak angkut 8 km/5m3) 242,900.00

24 Biaya operasional vibro roller 325,910.00

C III. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI (SNI 2836 : 2008 )


1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP 666,580.00
2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP 619,630.00
3 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP 587,080.00
4 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP 564,190.00
5 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PP 532,830.00
6 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 KP : 10 PP 534,920.00
7 Memasang 1 m3 pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP 506,700.00
8 Memasang 1 m3 batu kosong (aanstamping) 290,040.00
9 Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu 2,023,900.00
belah
10 Memasang 1 m3 pondasi sumuran, diameter 100 cm 666,470.00

D IV. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON (SNI 7394 : 2008 )


1 1 m3 beton untuk lantai kerja (bedding) 805,120.00
2 1 m3 beton mutu f'c = 7.4 M Pa ( K 100 ), slump ( 12 ± 2 ) cm, w/c = 0,87 (molen) 865,440.00

3 1 m3 beton mutu f'c = 9,8 M Pa ( K 125 ), slump ( 12 ± 2 ) cm, w/c = 0,78 (molen) 902,690.00

4 1 m3 beton mutu f'c = 12,2 M Pa ( K 150 ), slump ( 12 ± 2 ) cm, w/c = 0,72 (molen) 931,350.00

5 1 m3 lantai kerja beton mutu f'c = 7.4 M Pa ( K 100 ), slump ( 3 - 6 ) cm, w/c = 0,87 839,620.00
(molen)
6 1 m3 beton mutu f'c = 14,5 M Pa ( K 175 ), slump ( 12 ± 2 ) cm, w/c = 0,66 (molen) 965,880.00

7 1 m3 beton mutu f'c = 14,5 M Pa ( K 175 ), slump ( 12 ± 2 ) cm, w/c = 0,66 ready mix 1,105,170.00

8 1 m3 beton mutu f'c = 16,9 M Pa ( K 200 ), slump ( 12 ± 2 ) cm, w/c = 0,61 ready mix #N/A

9 1 m3 beton mutu f'c = 19,3 M Pa ( K 225 ), slump ( 12 ± 2 ) cm, w/c = 0,58 (molen) 1,023,340.00

10 1 m3 beton mutu f'c = 19,3 M Pa ( K 225 ), slump ( 12 ± 2 ) cm, w/c = 0,58 ready mix 1,122,770.00

11 1 m3 beton mutu f'c = 21,7 M Pa ( K 250 ), slump ( 12 ± 2 ) cm, w/c = 0,56 ready mix 1,134,500.00

12 1 m3 beton mutu f'c = 24,0 M Pa ( K 275 ), slump ( 12 ± 2 ) cm, w/c = 0,53 ready mix 1,146,230.00

13 1 m3 beton mutu f'c = 26,4 M Pa ( K 300 ), slump ( 12 ± 2 ) cm, w/c = 0,52 ready mix 1,157,960.00
NO HARGA
SATUAN #N/A
14 1 m3 beton mutu f'c = 28,8 M Pa ( K 325 ), slump ( 12 ± 2 ) cm, w/c = 0,49 ready mix

15 1 m3 beton mutu f'c = 31,2 M Pa ( K 350 ), slump ( 12 ± 2 ) cm, w/c = 0,48 ready mix 1,204,880.00

16 Pembesian 10 kg dengan besi polos 117,470.00


17 Pembesian 10 kg dengan besi ulir 122,720.00
18 Pembesian 10 kg kabel presstressed polos 113,820.00
19 Memasang 1 kg jaring kawat baja / wire mesh 29,010.00
20 Memasang 1 m2 bekisting untuk pondasi 201,480.00
21 Memasang 1 m2 bekisting untuk sloof 218,730.00
22 Memasang 1 m2 bekisting untuk sloof 2xpakai 139,000.00
23 Memasang 1 m2 bekisting untuk kolom 338,680.00
24 Memasang 1 m2 bekisting untuk kolom (menggunakan bambu) 344,330.00
25 Memasang 1 m2 bekisting untuk kolom (menggunakan bambu) 2x pakai 209,780.00
26 Memasang 1 m2 bekisting untuk balok 351,180.00
27 Memasang 1 m2 bekisting untuk balok (menggunakan bambu) 356,830.00
28 Memasang 1 m2 bekisting untuk balok (menggunakan bambu) 2x pakai 216,030.00
29 Memasang 1 m2 bekisting untuk plat lantai 384,880.00
30 Memasang 1 m2 bekisting untuk plat lantai (menggunakan bambu) 401,830.00
31 Memasang 1 m2 bekisting untuk plat lantai (menggunakan bambu) 2xpakai 238,530.00
32 Memasang 1 m2 bekisting untuk plat lantai (tanpa stegger) 253,050.00
33 Memasang 1 m2 bekisting untuk dinding 336,570.00
34 Memasang 1 m2 bekisting untuk dinding (menggunakan bambu) 345,050.00
35 Memasang 1 m2 bekisting untuk dinding (menggunakan bambu) 2x pakai 210,140.00
36 Memasang 1 m2 bekisting untuk tangga 309,830.00
37 Memasang 1 m2 bekisting untuk tangga (menggunakan bambu) 309,830.00
38 Memasang 1 m2 jembatan untuk pengecoran beton 140,310.00
39 Memasang 1 m2 jembatan untuk pengecoran beton (menggunakan bambu) 140,310.00
40 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) 3,749,860.00
41 Membuat 1 m3 strous beton (150 kg besi + bekisting) 3,749,860.00
42 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) 4,611,660.00
43 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) 7,572,260.00
44 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) / menggunakan 7,572,260.00
bambu
45 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) 5,942,420.00
46 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) / menggunakan 5,942,420.00
bambu
47 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting) 5,421,870.00
48 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) 5,197,350.00
49 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) / menggunakan 5,197,350.00
bambu
50 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) 5,439,990.00
51 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) / menggunakan 5,439,990.00
bambu
52 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm 70,040.00
53 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 89,740.00
NO HARGA
SATUAN
54 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 5 Kr 825,310.00

E V. ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING


1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran 233,890.00
spesi 1 PC : 2 PP
2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran 221,470.00
spesi 1 PC : 3 PP
3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran 213,070.00
spesi 1 PC : 4 PP
4 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran 208,780.00
spesi 1 PC : 5 PP
5 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran 207,410.00
spesi 1 PC : 6 PP
6 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran 201,680.00
spesi 1 PC : 3 KP : 10 PP
7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran 112,740.00
spesi 1 PC : 2 PP
8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran 106,830.00
spesi 1 PC : 3 PP
9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran 103,460.00
spesi 1 PC : 4 PP
10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran 101,330.00
spesi 1 PC : 5 PP
11 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran 100,210.00
spesi 1 PC : 6 PP
12 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran 97,900.00
spesi 1 PC : 8 PP
13 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 307,540.00
1 PC : 3 P
14 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 307,540.00
1 PC : 4 P
15 Memasang 1 m2 dinding bata berongga ekspos ukuran (5 x 11 x 24) cm, campuran 112,300.00
spesi 1 PC : 3 P

F VI. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN


1 Memasang 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm 55,400.00
2 Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm 48,900.00
3 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm 46,100.00
4 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm 44,180.00
5 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm 43,110.00
6 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 15 mm 41,770.00
7 Memasang 1 m2 plesteran 1 PC : 7 PP, tebal 15 mm 41,770.00
8 Memasang 1 m2 plesteran 1 PC : 8 PP, tebal 15 mm 41,290.00
9 Memasang 1 m2 plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm 42,550.00
10 Memasang 1 m2 plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm 42,860.00
11 Memasang 1 m2 plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm 65,450.00
NO HARGA
SATUAN
12 Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm 52,500.00
13 Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm 65,450.00
14 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm 52,500.00
15 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm 59,090.00
16 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm 57,720.00
17 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 20 mm 52,780.00
18 Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm 39,850.00
19 Memasang 1 m2 Berapen 1 PC : 5 PP, tebal 15 mm 27,600.00
20 Memasang 1 m’ Plesteran Skoning 1 PC : 2 PP, lebar 10 mm 39,850.00
21 Memasang 1 m2 Plesteran Ciprat 1 PC : 2 PP 34,270.00
22 Memasang 1 m2 finishing siar pasangan dinding bata merah (=20 m’) 19,940.00
23 Memasang 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m’) 9,560.00
24 Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP 42,100.00
25 Memasang 1 m2 acian 25,250.00
26 Memasang 1 m' benangan 24,910.00

G VII. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU


1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I ( ky. Jati ) 23,478,070.00

2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II ( ky. 13,799,500.00
Kamper )
3 Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II ( ky. Kamper ) 587,270.00
4 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I ( ky. Jati ) 1,095,470.00
5 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II (ky kamper) 828,500.00
6 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I (kayu jati) 729,580.00
7 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II (kayu kamper) 569,400.00

8 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I (kayu jati) 1,539,030.00
9 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas II (kayu kamper) 1,111,870.00

10 Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu 632,900.00
kamper (lebar sampai 90 cm)
11 Membuat 1 m2 pintu plywood rangkap, rangka expose kayu jati 846,820.00
12 Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kamper 675,950.00
13 Memasang 1 m2 jalusi kusen, kayu jati 1,112,780.00
14 Memasang 1 m2 jalusi kusen, kayu kamper 701,380.00
15 Memasang 1 m2 jalusi kusen, kayu ulin 1,320,130.00
16 Memasang 1 m2 teakwood rangkap, rangka expose kayu kamper 601,490.00
17 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kruing 10,528,570.00
18 Memasang 1 m3 konstruksi kuda-kuda expose, kayu kelas I / ky.jati 25,569,460.00
19 Memasang 1 m3 konstruksi gordeng, kayu kelas II / ky.meranti 9,079,150.00
20 Memasang 1 m3 konstruksi gordeng, kayu kelas II / ky.kruing 11,482,650.00
21 Memasang 1 m2 rangka atap genteng keramik, kayu kelas I / usuk ky. Kruing, reng 363,120.00
kamper
22 Memasang 1 m2 rangka atap genteng beton, kayu kelas II / usuk ky. Kruing, reng 514,060.00
kamper
NO HARGA
SATUAN
23 Memasang 1 m2 rangka atap sirap, kayu kelas II / ky.kruing 131,500.00
24 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III / ky. meranti 123,510.00

25 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III / ky. meranti 125,760.00

26 Memasang 1 m1 lisplank ukuran (2 x 20) cm, kayu kelas I atau kelas II / ky. Kamper 151,850.00

27 Memasang 1 m1 lisplank ukuran (2 x 20) cm, kayu kelas I atau kelas II / ky. Meranti 97,820.00

28 Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II / ky. Kamper 153,450.00

29 Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II / ky. Meranti 98,420.00

30 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III / ky. 217,370.00
31 Meranti
Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II / ky. 339,780.00
Meranti
32 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II / ky. Meranti 357,810.00

33 1 m' Pasang papan reuter (analis BOW) 35,950.00


34 Memasang 1 m1 Calsiplank (20 x 1) 61,000.00
35 Memasang 1 Bh Pintu PVC Lengkap 334,160.00

H VIII. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Memasang 1 m2 lantai tegel badak hitam ( 30 x 30 ) cm 101,950.00


2 Memasang 1 m2 lantai tegel badak merah ( 30 x 30 ) cm 101,950.00
3 Memasang 1 m2 lantai ubin warna ( 20 x 20 ) cm 100,560.00
4 Memasang 1 m2 lantai ubin teraso ( 30 x 30 ) cm 102,410.00
5 Memasang 1 m2 lantai ubin teraso ( 20 x 20 ) cm 111,990.00
6 Memasang 1 m2 lantai ubin PC abu - abu ( 20 x 20 ) cm 92,450.00
7 Memasang 1 m2 lantai keramik artistik ukuran (10 x 20) cm 170,320.00
8 Memasang 1 m2 lantai keramik ukuran (30 x 30) cm / polos 144,330.00
9 Memasang 1 m2 lantai keramik ukuran (30 x 30) cm / warna / motif / tekstur 146,430.00
10 Memasang 1 m2 lantai keramik ukuran (40 x 40) cm / polos 150,490.00
11 Memasang 1 m2 lantai keramik ukuran (40 x 40) cm / warna / motif / tekstur 155,210.00
12 Memasang 1 m2 lantai keramik ukuran (20 x 20) cm / polos 97,750.00
13 Memasang 1 m2 lantai keramik ukuran (20 x 20) cm / warna / motif / tekstur 98,110.00
14 Memasang 1 m’ plint keramik ukuran (10 x 20) cm 25,130.00
15 Memasang 1 m2 lantai karpet 58,230.00
16 Memasang 1 m2 underlayer/pelapis bawah karpet 84,800.00
17 Memasang 1 m2 dinding porselen ukuran (11 x 11) cm 120,850.00
18 Memasang 1 m2 dinding keramik artistik ukuran (10 x 20) cm 187,650.00
19 Memasang 1 m2 dinding keramik ukuran (20 x 25) cm polos 178,040.00
20 Memasang 1 m2 dinding keramik ukuran (20 x 25) cm / warna / motif / tekstur 185,540.00
21 Memasang 1 m2 dinding keramik ukuran (20 x 20) cm / polos 166,460.00
22 Memasang 1 m2 dinding keramik ukuran (20 x 20) cm / warna / motif / tekstur 175,470.00
NO HARGA
SATUAN
23 Memasang 1 m2 dinding batu alam / palimanan 215,320.00
24 Memasang 1 m2 dinding batu tempel hitam 259,270.00
25 Memasang 1 m2 dinding batu candi 278,070.00
26 Memasang 1 m2 dinding batu lempeng 215,540.00
27 Memasang 1 m2 wallpaper, lebar 50 cm 50,140.00
28 Memasang 1 m’ Step noising 57,120.00
29 Memasang 1 m2 lantai Granite Tile ukuran (60 x 60) cm 269,260.00
30 Memasang 1 m2 lantai Granite Tile ukuran (60 x 60) cm Ex. Granito 565,100.00
31 Memasang 1 m2 lantai Granite Tile ukuran (30 x 60) cm 286,250.00

I IX. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT


1 Memasang 1 m2 langit-langit asbes semen, tebal 4 mm 53,020.00
2 Memasang 1 m2 langit-langit asbes semen, tebal 5 mm 65,610.00
3 Memasang 1 m2 langit-langit asbes semen, tebal 6 mm 72,930.00
4 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm 40,210.00
5 Memasang 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 48,670.00
6 Memasang 1 m2 langit-langit Calsiboard ukuran (120x240x4) mm, tebal 4 mm 34,120.00
7 Memasang 1 m’ list plafond gypsum profil besar 38,200.00
8 Memasang 1 m’ list langit-langit kayu profil 21,970.00
9 Memasang 1 m2 langit-langit eternit 26,920.00

J X. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM


1 Memasang 1 kg besi profil siku 23,450.00
2 Memasang 1 kg baja profil canal 27,250.00
3 Memasang 1 kg rangka kuda-kuda baja IWF 28,280.00
4 Mengerjakan 100 kg pekerjaan perakitan 26,760.00
5 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku 986,190.00
6 Memasang 1 m2 pintu rolling door besi 172,140.00
7 Memasang 1 m2 pintu lipat (folding door) bahan plastik / PVC 64,900.00
8 Mengerjakan 10 cm pengelasan dengan las listrik 27,310.00
9 Memasang 1 m2 sunscreen alluminium 71,560.00
10 Memasang 1 m2 rolling door alluminium 153,500.00
11 Memasang 1 m kusen pintu alluminium ex YKK 160,370.00
12 Memasang 1 m kusen pintu alluminium coklat 144,860.00
13 Memasang 1 m kusen pintu alluminium perak 133,530.00
14 Memasang 1 m2 pintu alluminium strip lebar 8 cm 922,520.00
15 Memasang 1 m2 Daun pintu kaca rangka alluminium coklat 784,660.00
16 Memasang 1 m2 Daun pintu kaca rangka alluminium perak 738,460.00
17 Memasang 1 m2 Daun jendela kaca rangka alluminium 517,140.00
18 Memasang 1 m2 terali besi strip (2 x 3) mm 430,480.00
19 Memasang 1 m2 kawat nyamuk 96,670.00
20 Memasang 1 m2 jendela nako & teralis 111,440.00
21 Memasang 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm 211,410.00
22 Memasang 1 m’ talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 58,650.00

K XI. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP


NO HARGA
SATUAN
1 1 m2 Pasang atap genteng palentong kecil 69,640.00
2 1 m2 Pasang atap genteng flam press / lokal 48,440.00
3 1 m2 Pasang atap genteng karang pilang / lokal 55,940.00
4 1 M2 Pasang atap genteng karang pilang Bima Ambulu 100,940.00
5 1 M2 Pasang atap genteng Zincalume 124,800.00
6 1 M2 Pasang atap genteng metal roof 123,390.00
7 1 M2 Pasang atap genteng metal roof + insulin 117,530.00
8 1 M' Pasang genteng bubung palentong 113,860.00
9 1 M' Pasang genteng bubung flam press 78,110.00
10 1 M' Pasang genteng bubung karang pilang / lokal 94,860.00
11 1 M' Pasang genteng bubung karang pilang Bima Ambulu 98,110.00
12 1 M' Pasang genteng bubung Zincalume/Metal Roof 146,760.00
13 1 M' Pasang genteng bubung samping Zincalume/Metal Roof 68,130.00
14 1 m2 Pasang atap asbes gelombang kecil 4 mm 46,230.00
15 1 m2 Pasang atap asbes gelombang 0,92 m x 2,5 m x 5 mm 82,520.00
16 1 m' Pasang nok stel gelombang 1,05 m 56,730.00
17 1 m2 Pasang atap seng gelombang 61,980.00
18 1 m' Pasang atap nok seng 25,910.00
19 1 m2 Pasang atap PolyCarbonate 5 mm 133,650.00
20 1 m2 Pasang atap PolyCarbonate 10 mm 186,150.00
21 1 m2 Pasang atap Solartuf / roof light fiberglass 90 x 180 308,310.00

L XII. ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI


1 Memasang 1 buah kloset duduk / monoblok 1,753,000.00
2 Memasang 1 buah kloset duduk / monoblok Ex TOTO 2,959,810.00
3 Memasang 1 buah kloset jongkok porselen 318,020.00
4 Memasang 1 buah urinoir 2,395,070.00
5 Memasang 1 buah urinoir ex TOTO 4,936,570.00
6 Memasang 1 buah wastafel 953,970.00
7 Memasang 1 buah bak air fiberglass vol 1 m3 917,860.00
8 Memasang 1 buah bak mandi batu bata volume 0,30 m3 1,129,190.00
9 Memasang 1 m' pipa beton, dia. 15 cm 66,160.00
10 Memasang 1 m' pipa beton, dia. 20 cm 77,710.00
11 Memasang 1 m' pipa beton, dia. 30 cm 316,530.00
12 Memasang 1 m' pipa beton, dia. 40 cm 321,040.00
13 Memasang 1 m' pipa beton, dia. 50 cm 332,810.00
14 Memasang 1 buah bak kontrol pasangan batu bata uk. (30x30) cm, tinggi 35 cm 325,200.00

15 Memasang 1 buah bak kontrol pasangan batu bata uk. (45 x 45) cm, tinggi 50 cm 488,620.00
16 Memasang 1 buah bak kontrol pasangan batu bata uk. (60 x 60) cm, tinggi 65 cm 615,080.00

17 Memasang 1 m' pipa galvanis dia. 1/2" 46,590.00


18 Memasang 1 m' pipa galvanis dia. 3/4" 53,330.00
19 Memasang 1 m' pipa galvanis dia. 1" 73,720.00
20 Memasang 1 m' pipa galvanis dia. 2" 154,290.00
21 Memasang 1 m' pipa galvanis dia. 3" 244,930.00
NO HARGA
SATUAN
22 Memasang 1 m' pipa galvanis dia. 4" 346,290.00
23 Memasang 1 m' pipa PVC tipe AW dia. 1/2" 18,140.00
24 Memasang 1 m' pipa PVC tipe AW dia. 3/4" 21,100.00
25 Memasang 1 m' pipa PVC tipe AW dia. 1" 24,520.00
26 Memasang 1 m' pipa PVC tipe AW dia. 2" 58,650.00
27 Memasang 1 m' pipa PVC tipe AW dia. 3" 104,480.00
28 Memasang 1 m' pipa PVC tipe AW dia. 4" 145,570.00
29 Memasang 1 m' pipa PVC tipe AW dia. 6" 277,770.00
30 Memasang 1 m' pipa PVC tipe AW dia. 8" 414,100.00
31 Memasang 1 m' pipa PVC tipe AW dia. 10" 568,320.00
32 Memasang 1 buah kran biasa diameter 1/2" 56,450.00
33 Memasang 1 buah kran wastafel 67,800.00
34 Memasang 1 buah kran leher angsa 101,350.00
35 Memasang 1 buah floor drain 184,220.00
36 Memasang 1 buah Shower Kloset 96,550.00
37 Memasang 1 buah Shower Kamar Mandi 155,300.00
38 Memasang 1 buah Bak Cuci 352,650.00

M XIII. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA


1 1 buah Pasang kunci tanam biasa 101,550.00
2 1 buah Pasang kunci tanam Alumunium 113,070.00
3 1 buah Pasang kunci pintu 99,520.00
4 1 buah Pasang engsel pintu 35,810.00
5 1 buah Pasang engsel pintu alumunium 67,460.00
6 1 buah Pasang engsel jendela kupu-kupu 26,390.00
7 1 buah Pasang engsel jendela alumunium 34,120.00
8 1 buah Pasang grendel alumunium 35,270.00
9 1 buah Pasang Espanyolet 37,190.00
10 1 buah Pasang engsel angin 41,370.00
11 1 buah Pasang kait/hak angin 26,470.00
12 1 buah Pasang door closer 225,220.00
13 1 buah Pasang kunci selot 87,210.00
14 1 buah Pasang pegangan pintu / door holder 98,720.00
15 1 buah Pasang door stop 62,700.00
16 1 m2 pasang kaca, tebal 5 mm 110,470.00
17 1 m2 pasang kaca rayban, tebal 5 mm 134,810.00
18 1 m2 pasang kaca cermin, tebal 5 mm 131,970.00
19 1 m2 pasang stopsol, tebal 5 mm 15,810.00
20 1 m2 pasang kaca tempered, tebal 12 mm 1,593,860.00

N XIV. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN


1 1 m2 Pengecatan bidang kayu lama 45,360.00
2 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat 57,810.00
penutup
3 1 m2 Pelaburan bidang kayu dengan politur 59,400.00
4 1 m2 Pelaburan bidang kayu dengan cat residu dan ter 6,540.00
NO HARGA
SATUAN
5 1 m2 Pelaburan bidang kayu dengan vernis 35,070.00
6 1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 27,710.00

7 1 m2 Pengecatan tembok baru/interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat 25,480.00
penutup)
8 1 m2 Pengecatan tembok baru/exterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat 32,730.00
penutup)
9 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 20,590.00
10 1 m2 Pengecatan tembok lama/interior (1 lapis cat dasar, 2 lapis cat penutup) 19,040.00
11 1 m2 Pengecatan tembok lama/exterior (1 lapis cat dasar, 2 lapis cat penutup) 24,060.00
12 1 m2 Pengecatan permukaan baja dengan meni besi 22,130.00
13 1 m2 Pengecatan tembok weathercoat - putih 30,650.00
14 1 m2 Pengecatan tembok weathercoat - warna 39,500.00
15
16
17
XXI. HONOR

Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
A DPRD
1 Honor Tenaga Ahli /Tim Asistensi DPRD Org/Bln 3,136,800

B Honorarium Non PNS / PNS


1 Pakar/Praktisi/Pembicara Khusus/Narasumber Org/45 mnt 522,800
2 Pejabat Esl. II Org/45 mnt 418,200
3 Pejabat Esl. III / IV Org/45 mnt 209,100
4 Moderator Org/45 mnt 209,100
5 Tenaga Ahli / Narasumber Statistik Org/Aktivitas 313,700
6 Honor Narasumber Rapat Koordinasi Sinergi, OJH 500,000
Informasi dan Komunikasi Pembangunan Kesehatan
a. Narasumber Pro Poor Planing Budgeting dan Monitoring
7 Org/jam 900,000
(P3BM)
b. Narasumber Perencanaan Penganggaran Responsif
Org/jam 900,000
Gender (PPRG)
8 Penyusunan Standar Satuan Harga dan Perubahan (TI D3) Org/bulan 1,250,000
9 Jasa Administrasi Pengolah Data Org/bulan 750,000
Honor Pembantu Pengurus dan Penyimpan barang
10 Org/bulan 1,250,000
(Sekretariat Daerah)

C Honor Pelatih/ Pengajar/ Penyusun/ Pengawas/ Pemerik


1 Widyaiswara Org/45 mnt 522,800

2 Pelatih / Pengajar Org/45 mnt 313,700

3 Honor Penyusun Naskah / Materi / Makalah Org/45 mnt 52,300

4 Honor Pengawas Ujian Org/45 mnt 31,400

5 Honor Pemeriksa Hasil Ujian Org/45 mnt 5,200


D Honorarium Jasa Pelayanan Rumah Sakit
1 PNS
- Tenaga Medis (Dokter) org/aktv 165,000
- Tenaga Penunjang Medis(Tenaga Lab,Apotik,dll) org/aktv 135,000
- Tenaga Paramedis (Perawat,Bidan) org/aktv 135,000
2 Non PNS
- Tenaga Medis (Dokter) org/aktv 150,000
- Tenaga Penunjang Medis(Tenaga Lab,Apotik,dll) org/aktv 100,000
- Tenaga Paramedis (Perawat,Bidan) org/aktv 100,000
Tenaga Non PNS Non Medis Instalasi Sarana dan
- org/minggu 350,000
Prasarana (IPS)
3 jasa dokter umum PTT OB 2,050,000
4 jasa dokter gigi PTT OB 2,050,000
JASA SERVIS DENTAL UNIT
1 jasa servis dental unit OB 3,300,000
2 jasa servis kompresor OB 300,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 632
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)

E Kebudayaan dan Pariwisata


Penari, Pengrawit, Intruksi Seni, Pesinden
1 Honor penari/wiyogo/sinden
-Dalam Kabupaten Org/akt 250,000
-Luar Kabupaten Dalam Provinsi Org/akt 300,000
-Luar Propinsi Org/akt 525,000
2 Honor Pelatih,Instruktur, Pengajar
-Instruktur tari dalam kab Org/Keg 500,000
-Instruktur seni luar kota/kab dalam propinsi Org/akt 400,000
-Instruktur seni luar propinsi Org/akt 550,000
- Honor Pengrawit Org/Ha 100,000
- Honor Pemandu Wisata Org/Bln 750,000
- Honor Pemandu Wisata Org/Hr 250,000
3 Honor Nara Sumber Seni Dan Budaya Org/hr 150,000
4 Honor Perias Org/hr 250,000
5 Honor Peserta Pelatihan / Sosialisasi dll Org/hr 75,000
6 Honor Jasa Maskot Pariwisata Org/hr 2,000,000
7 Honor Jebeng Thulik Org/hr 250,000
8 Honor Panitia Org/hr 250,000
9 Honor Juri :
- Dalam Kabupaten Org/hr 500,000
- Luar Kabupaten Dalam Provinsi Org/hr 1,250,000
10 Honor Pendukung Pelaksana Org/akt 200,000
11 Honor Duta Wisata ke Surabaya Org/akt 500,000
12 Honor Penjaga Stand Org/hr 200,000
13 Pengiriman Duta Tari Ke Provinsi Org/akt 1,000,000
14 Pengiriman Peserta Lomba Ke Provinsi Org/akt 1,500,000
15 Honor Peserta BEC Org/hr 350,000
16 Honor Peserta BEC/Performing dari Luar Kab. Prov Org/akt 500,000
17 Honor Peserta Delegasi Kesenian Dari Luar Kab. Org/hr 500,000
18 Honor Komposer Org/keg 7,500,000
19 Pemberian Hadiah Uang Pemenang BEC Org 25,000,000
20 Pemberian Hadiah Uang Peserta Favorit Org 750,000
21 Honor Petugas MC Org/hr 250,000
22 Honor Operator LCD Org/hr 150,000
23 Juri BEC dari Luar Kabupaten Org/akt 500,000
24 Dalang Dari Dalam Kabupaten Org/akt 5,000,000
25 Dalang Dari Luar Kabupaten / Provinsi Org/akt 20,000,000
26 Pengrawit/Sinden Wayang Dari Dalam Kabupaten Org/akt 200,000
27 Pengrawit/Sinden Wayang Dari Luar Kabupaten/Provinsi Org/akt 1,000,000
28 Penyanyi/Pemain Musik Luar Kabupaten Org/akt 500,000
29 Penyanyi/Pemain Musik Luar Provinsi Org/akt 750,000
30 Honor Pengarah Seni dan Budaya org/akt 150,000
31 Honor penyanyi/pemain luar kabupaten org/akt 500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 633
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
32 Honor penyanyi/pemain luar provinsi org/akt 750,000
33 Honor Pemandu Wisata Ob 750,000

34 Honor /Jasa pengrawit /Penari/Pemusik/Penyanyi Sinden Oh 100,000


untuk latihan
35 Honor Juri BEC dari Luar Kabupaten org/atv 500,000
36 Honor Dalang dari dalam Kabupaten org/atv 5,000,000
37 Honor Dalang dari Luar Kabupaten/Propinsi org/atv 20,000,000
38 Honor Pengrawit Sinden wayang dari dalam Kabupaten org/atv 200,000
39 Honor Pengrawit Sinden wayang dari Luar Kabupaten/Propi org/atv 1,000,000
40 Pelawak org/atv 300,000
41 Penyanyi/Pemain Musik dalam Kabupaten org/atv 300,000
42 Penyanyi/Pemain Musik dalam Propinsi org/atv 500,000
43 Penyanyi/Pemain Musik luar Propinsi org/atv 750,000
44 Honor Petugas Pengambil Sumpah / Janji OHK 1.000.000
Anggota DPRD hasil pemilu dalam rapat paripurna istimewa

45 Petugas Derigen Lagu Indonesia Raya dan Padamu


Negeri dalam rapat Paripurna Istimewa OHK 150,000

46 Penyanyi Lokal / even 2,500,000

47 Penyanyi Nasional / even 50,000,000


48 Chef Nasional / even 50,000,000
49 Penata Tari / keg 3,500,000

F Kegiatan Pameran
1 Honor Penjaga Stand Pameran Org/Hr 100,000
2 Honor Tenaga Kasar Org/Aktv 250,000
3 Honor Tim Kesehatan Org/Aktv 250,000
4 Honorarium Festival dan Gelar Makanan dan Minuman Kha
- Honor Juru Masak Org/Aktv 500,000
- Penjaga Stan Org/Aktv 150,000

G Peternakan
Honorarium Terkait Kegiatan Lomba / Kontes Ternak
- Honor Juri Lomba / Kontes Ternak / aktv 2,500,000
- Honor Juri Lomba Mewarnai / Lukis / aktv 1,000,000
Insentif/Honor Penguatan Bagi Peternak Pemilik Sapi / 500.000,- s/d
- Ekor
Kerbau Bunting 1.000.000,-

H Pertanian
1 Narasumber (pelatih) Jam 100,000
2 Hok pembuatan lubang tanah (petani) Lubang 2,500
3 Upah Pembuatan Lubang OHK 35,000
4 Upah Penanaman OHK 35,000
5 Upah Pemupukan OHK 35,000
6 Upah Pemeliharaan OHK 35,000
7 Upah Pembersihan Kali / Sungai OHK 35,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 634
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
8 Upah Pemupukan dan Pengolahan Hama HOK 35,000
9 Upah Pembersihan Lapangan HOK 35,000
10 Upah Pembersihan Lahan Persemaian HOK 35,000
11 Upah Pemagaran Persemaian HOK 35,000
12 Upah Pembuatan Bedengan HOK 35,000
13 Upah Pembuatan Atap Naungan HOK 35,000
14 Upah Pengisian Kantong Plastik HOK 35,000
15 Upah Penataan Polybag HOK 35,000
16 Upah Penyiraman HOK 35,000
17 Upah Pemeliharaan dan Penyulaman HOK 35,000
18 Pemandu Lapangan org/jam 150,000

19 Honorarium Tim Terpadu Kajian Alih Fungsi Hutan Lindung


Menjadi hutan produksi
1 Pengarah OH 1,500,000
2 Penanggungjawab Teknis OH 1,250,000
3 Koordinator OH 1,000,000
4 Ketua Tim OH 1,000,000
5 Anggota Tim Terpadu OH 750,000
6 Sekretariat
-Ketua OK 400,000
-Anggota OK 300,000
-Nara Sumber OJ 1,400,000
20 Honorarium Panitia pelaksanaan Kegiatan

- Honorarium anggota tim terpadu kajian alih fungsi OH 750,000


hutan lindung menjadi hutan produksi
21 Honorarium Tim Pokja WISMP Pertanian Kabupaten
1 Ketua Org/bulan 245,000
2 Sekretaris Org/bulan 300,000
3 Anggota Org/bulan 290,000
Honorarium Panitia Panitia Pembekalan Petugas
Pendampingan Penyuluh Pertanian
- Ketua org'/ aktv 500,000
- Sekretaris org'/ aktv 400,000
- Anggota org'/ aktv 200,000

Honorarium Pendampingan
- Honor Petugas Pendampingan Pertanian ob 750,000
22 Honorarium Panitia Pelaksana Kegiatan/Pembinaan petani:
- Ketua org/aktv 250,000
- Sekretaris org/aktv 200,000
- Anggota org/aktv 150,000
23 Honorarium Narasumber / Pelatih org/jam 100,000
24 Honorarium / Bantuan Transport Peserta org/aktv 50,000
Honorarium Panitia Seleksi Petugas Pendampingan
25
Penyuluhan Pertanian
- Ketua org/aktv 750,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 635
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Sekretaris org/aktv 500,000
- Anggota org/aktv 350,000
26 Honor Pembekalan Petugas Pendampingan Penyuluhan
Pertanian :
- Ketua org/aktv 500,000
- Sekretaris org/aktv 400,000
- Anggota org/aktv 200,000
27 Uang Saku Peserta Pembekalan Petugas Pendampingan org/aktv 50,000
Demplot Padi Hibrida Padi Hibrida
28 Biaya Jasa Pendampingan Penyuluhan Pertanian org/bln 1,250,000
Honorarium Jasa Tenaga Non PNS
Honorarium Petugas Pendampingan (Penyuluh Pertanian) org/bln 1,750,000
29 - Honorarium Jasa Administrasi Pekantoran org/bln 1,000,000
- Jasa Tenaga Kebersihan org/bln 1,000,000

I Perikanan
1 Petugas CBIB org/hr 50,000
2 Pengawas Mutu Benih org/hr 50,000
3 Petugas KESLING org/hr 50,000
4 Pengawas Obat Ikan org/hr 50,000
5 Honor Petugas Labolatorium Perikanan Budidaya ob 750,000
6. Honor Tenaga Ahli Labolatorium ob 1,000,000
Honorarium POKJA Sertifikasi Hak Atas Tanah Nelayan
7 dan Usaha Penangkapan Ikan Skala Kecil
I Pokja
- Pengarah Org/Keg 2.000.000
- Ketua Org/Keg 1.500.000
= Anggota Org/Keg 1.500.000
II. Sekretaris POKJA :
= Ketua Org/Keg 1.500.000
- Anggota Org/Keg 1.000.000
III. Petugas Lapangan :
- Petugas Utama Kecamatan Org/Keg 1.500.000
- Petugas Utama Desa / Kelurahan Org/Keg 1.000.000
- Pembantu Pelaksana Lapangan Org/Keg 400000
8 Honorarium POKJA Sertifikasi Hak Atas Tanah
Pembudidaya Ikan
I. POKJA :
pengarah Org/Keg 2.000.000
- Ketua- Org/Keg 1.500.000
anggota - Org/Keg 1.500.000
II. Sekretaris POKJA :-
- Ketua - Org/Keg 1.500.000
- Anggota - Org/Keg 1.000.000
III. Petugas Lapangan ;
- Petugas Utama Kecamatan - Org/Keg 1.500.000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 636
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Petugas Utama Desa / Kelurahan - Org/Keg 1.000.000
- Pembantu pelaksana lapangan - Org/Keg 400,000

9 Honorarium Pelaksanaan Kegiatan Pelatihan Bagi


Pembudidaya Ikan
I. Honorarium Panitia Pelaksana
- Ketua Org/Keg 300,000
- Sekretaris Org/Keg 200,000
'- Anggota Org/Keg 100,000
II. Non PNS
‐ Anggota Org/Keg 100,000
10 Honorarium narasumber/tenaga ahli Org/45 menit 500,000
11 Honorarium peserta pelatihan Org/hari 50,000

J Pendidikan
1 - Honor Juri Lomba Mewarnai Tingkat TK s/d SD Org 250,000

Honor Juri Lomba Pidato Bahasa Inggris Tingkat SD Org 250,000


-
Honor Juri Lomba Pidato Bahasa Inggris Tingkat
Org 250,000
- SLTP
Honor Juri Lomba Pidato Bahasa Inggris Tingkat SLTA Org 250,000
-
Honor Juri Lomba Cerita Pahlawan Nasional Tingkat
Org 250,000
- SD
Honor Juri Lomba Cerita Pahlawan Nasional Tingkat
Org 250,000
- SLTP
Honor Juri Lomba Cerita Pahlawan Nasional Tingkat
Org 250,000
- SLTA
Honor Juri Lomba Perpustakaan Sekolah Tingkat SD Org 250,000
-
Honor Juri Lomba Perpustakaan Sekolah Tingkat
Org 250,000
- SLTP
Honor Juri Lomba Perpustakaan Sekolah Tingkat SLTA Org 250,000
-
Insentif Relawan Pendidik dan Tenaga Kependidikan (di
2
daerah dengan tingkat akses tersulit )
- kategori 1 /bulan 1,500,000
- kategori 2 /bulan 125,000
- kategori 3 /bulan 100,000
- Penjaga Sekolah /bulan 750,000
Honorarium, Tunjangan Jabatan Pegawai di Lingkup
3
Politeknik Negeri Banyuwangi
A. HONORARIUM
1. Dosen (S2) /bulan 2,000,000
2. Dosen / Administrasi (S1) /bulan 1,875,000
3. Teknisi (D3) /bulan 1,670,000
4. Administrasi (SMA) /bulan 1,525,000
5. Satpam Poliwangi /bulan 850,000
6. Petugas Kebersihan /bulan 500,000
B. TUNJANGAN OPERASIONAL DIREKTUR

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 637
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
1. Direktur /bulan 6,180,000
C. TUNJANGAN JABATAN
1. Pembantu Direktur I, II, III /bulan 800,000
2. Kaprodi /bulan 550,000
3. Ka. BUK /bulan 525,000
4 Pemberian Hadiah Pemuda Pelopor Tingkat Kab. Banyuwangi :
- Juara 1 Orang 2,000,000
- Juara 2 Orang 1,500,000
- Juara 3 Orang 1,000,000
5 Pemberian Hadiah Karya Tulis Ilmiah
Kategori SMK/SMA/MAN
- Juara 1 Orang 2,500,000
- Juara 2 Orang 2,000,000
- Juara 3 Orang 1,500,000
- Harapan 1 Orang 1,000,000
- Harapan 2 Orang 750,000
- Karya Terinovatif Orang 1,000,000
6 Kategori Mahasiswa/Umum
- Juara 1 Orang 3,000,000
- Juara 2 Orang 2,500,000
- Juara 3 Orang 2,000,000
- Harapan 1 Orang 1,500,000
- Harapan 2 Orang 1,000,000
- Karya Terinovatif Orang 1,250,000
Bahan Material Untuk Pelatihan Orang 250,000
7 Hadiah Lomba Posyandu Tingakat Kabupaten:
* Juara I unit 1,000,000
* Juara II unit 750,000
* Juara III unit 500,000
* Juara Nominasi Tingkat Kecamatan unit 500,000
8 Hadiah Lomba Pangan dan Sandang:
* Juara I unit 1,000,000
* Juara II unit 800,000
* Juara III unit 650,000
* Juara Harapan I unit 500,000
* Juara Harapan II unit 400,000
* Juara Harapan III unit 350,000
* Juara Favorit unit 600,000
9 Honorarium PNS Kegiatan BOP Madrasah Diniyah
- Penanggung Jawab I Org/Aktv 720,000
- Penanggung Jawab II Org/Aktv 720,000
- Ketua I Org/Aktv 650,000
- Ketua II Org/Aktv 650,000
- Sekretaris Org/Aktv 600,000
- Bendahara Org/Aktv 540,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 638
9

Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Anggota Org/Aktv 350,000
- Pembantu Umum Org/Aktv 268,000
Honorarium Non PNS Kegiatan Lembaga Penjamin Mutu
Pendidikan :
10
- Penanggung Jawab Org/Aktv 1,250,000
- Ketua Org/Aktv 1,000,000
- Sekretaris Org/Aktv 750,000
- Anggota Org/Aktv 500,000
Honorarium PNS Pelaksanaan Kegiatan Pembinaan
Minat, Bakat dan Kreatifitas Siswa Berprestasi,OSN,
11
O2SN, FLS2N, LKS, WOKSHOP, MKKS, PPDB,UNAS,
dan Kegiatan Lomba-lomba di Pendidikan Menengah :
- Penanggung Jawab Org/Aktv 1,250,000
- Ketua Org/Aktv 1,000,000
- Sekretaris Org/Aktv 750,000
- Anggota Org/Aktv 500,000
Honorarium Non PNS Pelaksanaan Kegiatan Pembinaan
Minat, Bakat dan Kreatifitas Siswa Berprestasi,OSN,
12
O2SN, FLS2N, LKS, WOKSHOP, MKKS, PPDB,UNAS,
dan Kegiatan Lomba-lomba di Pendidikan Menengah :
- Ketua Org/Aktv 1,000,000
- Sekretaris Org/Aktv 750,000
- Anggota Org/Aktv 500,000
13 Hadiah Uang Lomba Kuliner Tingkat Kabupaten :
- Juara I orang 1,250,000
- Juara II orang 1,000,000
- Juara III orang 750,000
Honorarium Tim Penilai kegiatan Peningkatan Partisipasi
14 Masyarakat terhadap Pengairan melalui kegitan Lomba
Fotografi:
- Honor Juri Org/Akt 750,000

- Kategori Pelajar :
Juara I Ls 3,500,000
Juara II Ls 3,000,000
Juara III Ls 2,500,000
Juara harapan I Ls 1,500,000
Juara harapan II Ls 1,000,000
- Kategori Mahasiswa :
Juara I Ls 5,000,000
Juara II Ls 4,000,000
Juara III Ls 3,000,000
Juara harapan I Ls 1,500,000
Juara harapan II Ls 1,000,000
- Kategori Umum :
Juara I Ls 6,000,000
Juara II Ls 5,000,000
Juara III Ls 4,000,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 639
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
Juara harapan I Ls 2,500,000
Juara harapan II Ls 1,500,000
Hadiah Uang yang akan diserahkan kepada Pihak Ke Tiga
15.1 Kegiatan Peningkatan Partisipasi Masyarakat terhadap
Pengairan melalui Lomba Fotografi :

Kategori Mahasiswa
- Juara I / Org 6,000,000
- Juara II / Org 5,000,000
- Juara III / Org 4,000,000
- Juara Harapan I / Org 2,500,000
- Juara Harapan II / Org 2,000,000
Kategori Pelajar
- Juara I / Org 3,500,000
- Juara II / Org 3,000,000
- Juara III / Org 2,500,000
- Juara Harapan I / Org 1,500,000
- Juara Harapan II / Org 1,000,000
Kategori Umum
- Juara I / Org 7,000,000
- Juara II / Org 6,000,000
- Juara III / Org 5,000,000
- Juara Harapan I / Org 3,500,000
- Juara Harapan II / Org 2,500,000
Kegiatan Penyelenggaraan Lomba Desa dan kelurahan
16
Tahun 2015
a. Honorarium PNS :
* Honorarium Panitia Pelaksana Kegiatan :
- Wakil Org/Akt 500,000
- Wakil Ketua Org/Akt 400,000
- Anggota Org/Akt 250,000
- Juri Lomba Org/Akt 250,000
b. Honorarium Non PNS :
* Honorarium Panitia Pelaksana Kegiatan :
- Anggota Org/Akt 156,000
- Juri Lomba Org/Akt 250,000
c. Hadiah Lomba pemenang Lomba Desa dan Kelurahan :
- Juara I Tingkat Desa / Desa 42,000,000
- Juara II Tingkat Desa / Desa 20,000,000
- Juara III Tingkat Desa / Desa 17,000,000
- Juara Harapan I Tingkat Desa / Desa 14,000,000
- Juara Harapan II Tingkat Desa / Desa 11,000,000
- Juara Harapan III Tingkat Desa / Desa 9,000,000
- Juara I Tingkat Kelurahan / Kelurahan 30,000,000
- Juara II Tingkat Kelurahan / Kelurahan 10,000,000
Kegiatan Festival Permainan Anak Tradisional (satu
17
Kelompok Peserta terdiri dari 2 s/d Anak).

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 640
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
a. Juara I / Kelompok 2,000,000
b. Juara II / Kelompok 1,500,000
c. Juara III / Kelompok 1,000,000
d. Juara Harapan I / Kelompok 750,000
e. Juara Harapan II / Kelompok 500,000
Honor/Jasa Guru Pendamping Khusus untuk Pendidikan
18 Org/bulan 300,000
Inklusif
19 Hadiah pemenang Banyuwangi Ethno Carnival (BEC)
a. The Best Costum /Org 3,000,000
b. Juara I /Org 2,500,000
c. Juara II /Org 2,000,000
d. Juara III /Org 1,500,000
e. Juara IV /Org 1,000,000
f. Juara V /Org 750,000
g. Juara Hiburan /Org 500,000
-Honor Tenaga Ahli Luar Daerah Lomba Daerah Kegiatan
/Org 1,250,000
Banyuwangi Ethno Carnival (BEC)
Kegiatan Pembinaan dan Pengembangan Sumber Daya
20
Komunikasi dan Informasi
- Hadiah Utama Pemenang di Sosial Media Instagram / Akt 2,500,000
- Hadiah Pemenang di Sosial Media Instagram / Akt 1,000,000
- Hadiah Utama Pemenang di Sosial Media Twiter / Akt 2,500,000
- Honor Fotografer Org / Akt 1,250,000
- Honor Operator Multi Media Org / Akt 1,000,000
- Honor Penulis Berita Org / Akt 1,000,000
- Honor Tim Penilai/Juri Lomba Twitter dan Instagram / Akt 500,000
Pemberian Hadiah Uang Lomba Branding dan Packaging
21
Tingkat Kabupaten
- Juara I / Org 1,250,000
- Juara II / Org 1,000,000
- Juara III / Org 750,000

K Kesehatan
1 Honor penyemprot sarang nyamuk /hari 50,000
2 Honor petugas pembersih lumut /hari 50,000
3 Honor Petugas Kesehatan org/aktv 50,000
4 Honor Juri Lomba Balita Sehat Sejahtera / hari 50,000
Honorarium Narasumber Workshop/Pelatihan Kesehatan
5 Ibu dan AnakNarasumberWorkshop/Pelatihan
Tingkat Dinas Kesehatan OH 750,000
Honorarium Kesehatan
6 Ibu dan Anak Tingkat Puskesmas OH 500,000
7 Honor PPGD Org/Akt 100,000
8 Honor Lomba Jumantik OH 150,000
9 Honor Apoteker OB 2,050,000
10 Honor Entry Data Pemantauan Status Gizi / hari 50,000
11 Honor Survey Kadarzi (Dasawisma) /dasawisma 15,000
Honor Penangkap Nyamuk
12 / bulan 50,000
Longitunal Survey
13 Honor Spot Check Survey / hari 50,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 641
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
14 Honor Kader Pemantauan Endemisitas Filariasis / hari 50,000

15 Honor Tim Penilai DUPAK (Daftar Usulan Penetapan /Orang 25,000


Angka Kredit) jabatan Fungsional rumpun Kesehatan
16 Honor Tim Pengelola Jamkesda OB 150,000
17 Honor Tenaga Verifikator Program Jamkesda OB 200,000
18 Honor Pengambilan Data Kadarzi /dasa wisma 15,000
19 Honor Petugas DBD dan Malaria org/aktv 50,000
20 Honor petugas Fogging Fokus /hari 50,000
21 Honor Tim Penilai LBSI org/aktv 50,000
22 Honor/uang saku peserta sosialisasi/pelatihan/pertemuan org/aktv 53,000
23 Honor Dokter spesialis/tenaga ahli puskesmas Plus /bulan 600,000
24 Honor Dokter umum puskesmas Plus /bulan 1,200,000
25 Jasa Tes laboratorium pemeriksaan sample darah serro sur /sample 65,000
26 Honor Pendata PMKS org/hr 50,000
27 Honor Entri Data PMKS org/hr 50,000
28 Honor Visite Dokter Per Paien Per 10,000
29 Honor Verivikator OB 750,000
30 Tim Pengelola Jamkesda/SPM
a. Penanggungjawab OB 750,000
b. Ketua OB 650,000
c. Sekretaris OB 550,000
d. Anggota OB 350,000
31 Honorarium instruktur kesegaran jasmani 0rg/Aktv 150,000
Honorarium sketsa gambar lomba mewarnai PHBS
32 0rg/Aktv 150,000
kesegaran jasmani
33 Jasa/Honor Dokter Umum icon Gubernu OB 2,500,000
34 Honorarium Pegawai BLUD (Non PNS)
1 Dokter Spesialis Ob 9,000,000

TAMBAHAN PENGHASILAN dokter (PNS/NON PNS)

1.a Honor / Jasa dokter Sub Spesialis Org/Bln 15,000,000


b. Honor / Jasa dokter Spesialis Org/Bln 10,000,000
2. Honor / Jasa dokter umum / gigi Org/Bln 4,000,000
3 Apoteker OB 4,000,000
3.2 Tenaga Tehnisi Kefarmasian OB 1,250,000
Sarjana Administrasi / Akuntansi / Ekonomi /
4 OB 1,500,000
Kesehatan
- Dari APBD OB 1,500,000
5 Perawat/ Bidan OB 1,250,000
6 Tenaga Penunjang Kesehatan OB 1,000,000
7 Administrasi / Umum OB 1,000,000
8 Tenaga Kebersihan,Taman,Laundry OB 750,000
9 Petugas Keamanan OB 750,000

10 Tenaga Fisikawan Medik OB 2,000,000

11 Tenaga Gizi OB 1,250,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 642
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
12 Tenaga Radiografer OB 1,250,000
13 Tenaga Teknologi Laboratorium Medik OB 1,250,000
14 Administrasi / Umum OB 1,250,000
15 Tenaga Kebersihan, Taman, Loundry OB 1,000,000
16 Tenaga Keamanan OB 1,000,000
Honorarium PNS
1. Dokter Umum/Gigi org/bulan 1,000,000
2. Dokter Spesialis org/bulan 5,000,000
3. Perawat / Bidan org/bulan 675,000
4. Asisten Apoteker org/bulan 675,000
5. Penunjang Medis org/bulan 675,000
6. Administrasi org/bulan 500,000
7. Tenaga harian LepasTenaga Kesehatan org/Bulan 500,000
8. Tenaga Harian Lepas paramedis org/Bulan 500,000
9. Tenaga Harian Lepas Dokter Umum org/Bulan 2,050,000
10. Tenaga Harian Lepas Dokter Gigi org/Bulan 2,050,000
11. Honorarium Perawat PONKESDES dengan rincian : OB 1,000,000
- Dari APBD OB 750,000
-13.
Sharing dari propinsi OB 500,000
Verifikator Jamkesda,Jamkesmas, Jamkesmin dan
Pembiayaan Kesehatan Lainnya org/Bulan 500,000
35 Honorarium Dewan Pengawas RSUD
Ketua Org/Bulan 1,250,000
Anggota Org/Bulan 1,000,000
Sekretaris Org/Bulan 600,000
36 Honorarium Tim Pembina RSUD
Penasehat Org/Bulan 2,500,000
Pembina Teknis Org/Bulan 1,500,000
Pembina Keuangan Org/Bulan 1,200,000

L Honorarium Korps Musik


1 Pembina Korsik org/aktv 250,000
2 Ka. Unit Korsik org/aktv 200,000
3 Wakil Ka. Unit Korsik org/aktv 150,000
4 Anggota / Pelatih Korsik org/aktv 120,000
5 Anggota / Korlap Korsik, Gitapati dan Paramanandi org/aktv 110,000
Anggota / Pemain, Petugas Administrasi dan Petugas
6 org/aktv 100,000
Peralatan Korsik
7 Instruktur / Pelatih Korsik org/aktv 750,000

M Honorarium Tenaga Penelitian


1 Peneliti
- Peneliti Utama org/jam 50,000
- Peneliti Madya org/jam 45,000
- Peneliti Muda org/jam 40,000
- Peneliti Pertama org/jam 30,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 643
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Peneliti Non Fungsional org/jam 27,500
- Pembantu Peneliti org/jam 20,000
3 Pengolah Data penelitian 1,000,000
4 Petugas Survey org/hari 25,000
5 Pembantu Lapangan org/hari 50,000
6 Koordinator Peneliti org/bulan 350,000
7 Sekretariat Penelitian org/bulan 250,000

N Honor Panitia Pengadaan Tanah


1 1 Ketua org/bulan 1,000,000
2 Wakil Ketua org/bulan 900,000
3 Sekretaris org/bulan 800,000
4 Anggota org/bulan 700,000
5 Pembantu Pelaksana org/bulan 400,000
Honor Tim Musyawarah Pengadaan Tanah selain bagi
2 Pelaksanaan Pembangunan untuk kepentingan umum dan
kepentingan umum skala kecil
1 Ketua org/aktv 1,000,000
2 Wakil Ketua org/aktv 900,000
3 Sekretaris org/aktv 800,000
4 Anggota org/aktv 700,000
5 Pembantu Pelaksana org/aktv 400,000
Honorarium Tim Perencanaan Pengadaan Tanah Bagi
3
Pembangunan untuk kepentingan Umum
Kepentingan Umum
- Ketua org/keg 1,600,000
- Wakil Ketua org/keg 1,500,000
- Sekretaris org/keg 1,350,000
- Anggota Tetap org/keg 1,150,000
- Anggota Tidak Tetap org/keg 1,000,000
- Sekretariat org/keg 750,000
4 Kegiatan Panitia Persiapan Pengadaan Tanah :
a. Honor SK Kabupaten :
- Penasehat Org/Keg 2,750,000
- Ketua Org/Keg 1,600,000
- Wakil Ketua I Org/Keg 1,500,000
- Wakil Ketua II Org/Keg 1,500,000
- Sekretaris Org/Keg 1,350,000
- Anggota tetap Org/Keg 1,150,000
- anggota tidak tetap Org/Keg 1,000,000
- Sekretariat Org/Keg 750,000
b. Honor SK Sekda Propinsi
- Sekretaris Org/Keg 1,140,000
- Anggota ( Eselon III ) Org/Keg 1,140,000
- Anggota ( eselon IV ) Org/Keg 900,000
- Anggota ( Staf ) Org/Keg 600,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 644
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
c. Honor SK Gubernur Jawa Timur
- Penasehat Org/Keg 3,000,000
- Ketua Org/Keg 2,000,000
- wakil ketua I Org/Keg 1,500,000
- wakil Ketua II Org/Keg 1,500,000
- Wakil Ketua III Org/Keg 1,500,000
- Wakil Sekretaris Org/Keg 1,500,000
- Sekretaris Org/Keg 1,500,000
- Anggota tetap Org/Keg 1,250,000
- Anggota tidak tetap Org/Keg 2,750,000
d. Panitia Pelaksanaan Pengadaan tanah
- Ketua Org/Keg 1,500,000
- Wakil ketua Org/Keg 1,400,000
- Sekretaris Org/Keg 1,350,000
- Anggota tetap Org/Keg 1,150,000
- Anggota tidak tetap Org/Keg 1,000,000
- Sekretariat Org/Keg 750,000
e. Satuan Tugas Ukur Pengadaan Tanah
- Ketua Org/Keg 1,000,000
- Anggota Org/Keg 750,000
f. satuan Tugas Inventarisasi Pengadaan Tanah
- Ketua Org/Keg 1,000,000
- Anggota Org/Keg 750,000

O Honor Panitia Penghapusan Barang-barang Inventaris


dan Barang-barang lainnya
Milik/Yang Dikuasai Pemerintah Kabupaten Banyuwangi
1 Ketua org/aktv 400,000
2 Sekretaris org/aktv 300,000
3 Anggota org/aktv 250,000
O.1 Bimbingan Teknis Penyusunan APBD :
- Honor Narasumber org/45 mnt 400,000
* Honorarium Panitia Pelaksana Kegiatan :
- Penanggung Jawab org/akt 1,500,000
- Ketua org/akt 1,350,000
- Wakil Ketua org/akt 1,300,000
- Sekretaris org/akt 1,250,000
- Koordinator org/akt 1,100,000
- Anggota org/akt 1,000,000
- Non PNS org/akt 300,000
Peningkatan Pengelolaan Keuangan / Belanja Tidak
O.2
Langsung
* Honorarium Panitia Pelaksana Kegiatan :
- Penanggung Jawab org/bln 1,200,000
- Ketua org/bln 1,100,000
- Wakil Ketua org/bln 1,000,000
- Anggota org/bln 900,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 645
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Non PNS org/bln 300,000
Penyusunan Sistem dan Prosedur Pengelolaan
O.3
Keuangan :
* Honorarium Panitia Pelaksana Kegiatan :
- Penanggung Jawab org/akt 1,500,000
- Ketua org/akt 1,400,000
- Wakil Ketua org/akt 1,350,000
- Sekretaris org/akt 1,350,000
- Anggota org/akt 1,200,000

P Honor Panitia Penjualan Kendaraan Milik Pemerintah


Kabupaten Banyuwangi
1 Ketua org/aktv 400,000
2 Sekretaris org/aktv 300,000
3 Anggota org/aktv 250,000

Q Honorarium Pelaku PNPM Mandiri Perdesaan


1 Petugas / Pengurus BKAD org / keg 50,000
2 Petugas / Pengurus BP UPK org / keg 50,000
3 Petugas / Pendamping Lokal org / keg 20,000
4 Petugas / Kader Desa org / keg 25,000
5 Honorarium / Insentif Pengawas UPK

R Program Gerdu Taskin Tahap Awal


6 Kepala Desa org / aktv 457,500
7 BPD org / aktv 375,000
8 Masyarakat org / aktv 375,000

S Honorarium / Insentif Pengawas UPK


Program Gerdu Taskin Tahap Penguatan
1 Kepala Desa org / aktv 233,650
2 BPD org / aktv 190,000
3 Masyarakat org / aktv 190,000

T Honorarium Perangkat Unit Layanan Pengadaan ( ULP )


a. Kepala ULP org/bulan 1,000,000
b. Sekretaris ULP org/bulan 750,000
c. Staf pendukung org/bulan 500,000
Honorarium Pejabat Pengadaan Barang / Jasa
a. Panitia Pengadaan Barang Dan Kelompok Kerja
OP
(POKJA) Unit Pelayanan Pengadaan (Kontruksi)

c. Panitia Pengadaan Barang Dan Kelompok Kerja


OP
(POKJA ) Unit Pelayanan Pengadaan (Non Kontruksi)
d. Panitia Pengadaan Barang Dan Kelompok Kerja
(POKJA) Unit Pelayanan Pengadaan (Jasa OP
Konsultansi/Jasa Lainnya)

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 646
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
U Diklat Pegawai
a. Honor Penyusun Naskah Pelajaran org/keg 150,000
Org/Peserta/M
b. Honorpengawas Ujian/Pemeriksa hasil ujian
ateri ujian 10,000
c. Honoraium Penyelenggara Diklat
Penanggung Jawab org/bulan/keg 1,000,000
Panitia/Pembantu Panitia org/bulan/keg 600,000
Honorarium Pengarah dan Pendamping Pada
d. pembukaan dan penutupan Diklat
Eselon III org/keg 1,000,000
Eselon IV org/keg 800,000
Honorarium Tim Teknis Pelaksana Kenaikan Pangkat
e. org/jam 150,000
dari Kanreg II BKN

V INSPEKTORAT
HONORARIUM PEMBINAAN DAN PENGAWASAN
1. PENANGGUNG JAWAB Org/Jam/Akt 213,000
2. PEMBANTU PENANGGUNG JAWAB Org/Jam/Akt 62,000
3. PENGENDALI TEKNIS Org/Jam/Akt 50,500
4. KETUA TIM Org/Jam/Akt 40,500
5. ANGGOTA TIM Org/Jam/Akt 30,500

HONORARIUM TIM WHISLE BLOWING SYSTEM (WBS)


1. PENANGGUNG JAWAB Org/Bulan 1,500,000
2. PEMBANTU PENANGGUNG JAWAB Org/Bulan 1,250,000
3. KETUA TIM Org/Bulan 1,000,000
4. SEKRETARIS Org/Bulan 750,000
5. ANGGOTA TIM Org/Bulan 500,000

HONORARIUM TIM PENILAI INTERNAL KEGIATAN


PEMBANGUNAN ZONA INTEGRITAS KABUPATEN
1. PENANGGUNG JAWAB Org/Akt 1,500,000
2. KETUA I Org/Akt 1,250,000
3. KETUA II Org/Akt 1,000,000
4. SEKRETARIS Org/Akt 750,000
5. ANGGOTA 1 Org/Akt 650,000
6. ANGGOTA 1 Org/Akt 400,000

HONORARIUM TIM PENILAI INTERNAL PERANGKAT


DAERAH
1. PENANGGUNG JAWAB Org/Jam/Akt 62,000
2. PENGENDALI TEKNIS Org/Jam/Akt 50,500
3. KETUA TIM Org/Jam/Akt 40,500
4. ANGGOTA TIM Org/Jam/Akt 30,500

HONORARIUM TIM PENYUSUN ILHP


1. PENANGGUNG JAWAB Org/Akt 1,500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 647
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
2. KETUA Org/Akt 1,000,000
3. SEKRETARIS Org/Akt 750,000
4. KOORDINATOR Org/Akt 500,000
5. ANGGOTA Org/Akt 400,000

HONORARIUM TIM PENGENDALIAN GRATIFIKASI


1. PENANGGUNG JAWAB Org/Akt 1,500,000
2. PEMBANTU PENANGGUNG JAWAB Org/Akt 1,250,000
3. KETUA TIM Org/Akt 1,000,000
4. SEKRETARIS Org/Akt 750,000
5. ANGGOTA TIM Org/Akt 500,000

HONORARIUM TIM KEGIATAN PMPRB ONLINE


1. PENANGGUNG JAWAB Org/Bulan 1,500,000
2. KOORDINATOR I Org/Bulan 1,000,000
3. KOORDINATOR II Org/Bulan 1,000,000
4. SEKRETARIS Org/Bulan 700,000
5. ANGGOTA 1 Org/Bulan 500,000
6. ANGGOTA 2 Org/Bulan 400,000

HONORARIUM TIM PENILAI ZONA INTEGRITAS SKPD


1. Pembantu Penanggung jawab Org/Akt 750,000
2. Pengendali teknis Org/Akt 650,000
3. Ketua tim Org/Akt 500,000
4. Anggota Org/Akt 400,000

HONORARIUM TIM PENILAI ZONA INTEGRITAS


KABUPATEN
1. Penanggung jawab Org/Akt 1,500,000
2. Ketua I Org/Akt 1,250,000
3. Ketua II Org/Akt 1,000,000
4. Sekretaris Org/Akt 750,000
5. Anggota 1 Org/Akt 650,000
6. Anggota II Org/Akt 400,000

Honorarium Tim Asistensi Pembahasan Rencana


Peraturan Perundang - Undangan:
Ketua' Org/Bln 1,500,000
Wakil Ketua Org/Bln 1,250,000
Sekretaris Org/Bln 1,000,000
Anggota Org/Bln 800,000
Unsur SKPD Pemrakarsa Org/Bln 800,000

Honorarium Panitia Pemantapan Pelaksanaan


W
Peraturan Perundang-Undangan

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 648
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
a. Pengarah Org/Akt 750,000
b. Ketua Org/Akt 650,000
c. Sekretaris Org/Akt 550,000
d. Bendahara Org/Akt 450,000
e. Anggota Org/Akt 350,000

Honorarium Kuasa Hukum Di Lingkungan Pemerintah


X
Kabupaten Banyuwangi

Honorarium PNS Org/Akt 350,000

Y Honorarium Panitia Pelaksana Kegiatan Pelatihan


Ketrampilan Manajemen BUMDes
-Ketua Org/Akt 500,000
-Wakil Ketua Org/Akt 400,000
-Sekretaris Org/Akt 300,000
-Anggota Org/Akt 200,000

Honorarium Panitia Pengolah Data Base Kabupaten


Z dalam rangka indentifikasi dan akurasi data
RTSM,RTM dan RTHM
-Ketua org/bln 500,000
-Wakil Ketua org/bln 400,000
-Sekretaris org/bln 350,000
-Anggota org/bln 300,000

A.1 Honorarium Panitia Pengolah Data Base indentifikasi


dan akurasi data RTSM,RTM dan RTHM
-Camat ( Penanggung jawab Pendataan Kecamatan ) org/bln 400,000
-Lurah/Kades ( Penanggung jawab Pendataan Kelurahan
org/bln 300,000
Kel/Desa atau Koordinator Pendataan )
-Sekdes//Kelurahan ( Wakil Koordinator ) org/bln 200,000
-Tenaga Survey ( Honor petugas pengolah/entry data base
Kecamatan dalam rangka indentifikasi dan akurasi data org/responden 2,600
RTSM,RTM dan RTHM)

-Tenaga Survey ( Honor petugas pengolah/entry data base


Kel./Desa dalam rangka indentifikasi dan akurasi data org/responden 3,200
RTSM,RTM dan RTHM)

A.2 Honorarium Panitia Pelatihan Indentifikasi dan Akurasi


data RTM
-Ketua Org/Akt 500,000
Ketua Org/Akt 500,000
-Wakil Ketua Org/Akt 400,000
-Sekretaris Org/Akt 350,000
-Anggota Org/Akt 300,000
A.3 Honorarium Penanggung Jawab PNPM Mandiri Pedesaa

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 649
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
-Penanggung jawab wilayah Kecamatan PNPM-MPd (Rp.)
(Camat) org/bln 500,000

A.4 Honorarium Tim Validasi aset Tetap


-Penanggung Jawab org/bln 1,500,000
Ketua org/bln 1,300,000
-Sekretaris org/bln 1,200,000
-Koordinator org/bln 1,000,000
-Anggota org/bln 800,000

Honorarium Tim Fasilitator Penyusunan Laporan


Keuangan SKPD Kegiatan Pembinaan Sistem
A.5 Akuntansi dan Pelaporan Sub. Kegiatan Pembinaan
Sistem Akuntansi dan Pelaporan Pengelolaan
Keuangan SKPD :
- Penanggung Jawab org/bln 600,000
- Ketua org/bln 500,000
- Koordinator org/bln 400,000
- Anggota org/bln 300,000
Honorarium Tim Pelaksana Pengembangan dan
Sosialisasi SIMBADA Kegiatan Pembinaan Sistem
A.5.a Akuntansi dan Pelaporan Sub Kegiatan Pembinaan
Akuntansi dan Pencatatan Aset Daerah :

- Penanggung Jawab org/bln 1,500,000


- Ketua org/bln 1,300,000
- Sekretaris org/bln 1,200,000
- Koordinator org/bln 1,000,000
- Anggota org/bln 800,000
Honorarium Kegiatan Bimbingan Teknis Penyusunan
A.5.b APBD Sub. Kegiatan Bimbingan Teknis Penyusunan
APBD 2015 :
1. Honorarium PNS
- Penanggung Jawab org/aktv 1,500,000
- Ketua org/aktv 1,350,000
- Wakil Ketua org/aktv 1,300,000
- Sekretaris org/aktv 1,250,000
- Koordinator org/aktv 1,100,000
- Anggota org/aktv 950,000
2. Honorarium (Non PNS) :
- Anggota org/aktv 250,000

Honorarium Kegiatan Asistensi Rancangan Peraturan


A.5.c
Daerah Tentang APBD
1. Honorarium PNS
- Penanggung Jawab org/aktv 600,000
- Ketua org/aktv 500,000
- Wakil Ketua org/aktv 450,000
- Anggota org/aktv 400,000
2. Honorarium (Non PNS) :

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 650
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Anggota org/aktv 200,000

Honorarium Kegiatan Peningkatan Pengelolaan


A.5.d Keuangan Daerah Sub Kegiatan Verifikasi Anggaran
Belanja Daerah Kab. BWI :

1. Honorarium PNS
- Penanggung Jawab org/bln 1,000,000
- Ketua org/bln 900,000
- Wakil Ketua org/bln 800,000
- Anggota org/bln 700,000
2. Honorarium (Non PNS) :
- Anggota org/bln 200,000
Honorarium PNS Kegiatan Penyusunan Sistem dan
Prosedur Pengelolaan Keuangan Daerah Sub Kegiatan
A.5.e Penyusunan Perbup. Tentang Sistem dan Prosedur
Pengelolaan Keuangan Daerah :

- Penanggung Jawab org/aktv 1,500,000


- Ketua org/aktv 1,400,000
- Wakil Ketua org/aktv 1,350,000
- Sekretaris org/aktv 1,300,000
- Koordinator org/aktv 1,200,000
- Anggota org/aktv 1,100,000
Honorarium Tim Penyusunan Kebijakan Akuntansi
A.5.f Pemkab. Banyuwangi Kegiatan Penyusunan Sistem
Informasi Pengelolaan Keuangan Daerah

- Penanggung Jawab org/bln 1,500,000


- Ketua org/bln 1,300,000
- Sekretaris org/bln 1,200,000
- Koordinator org/bln 1,000,000
- Anggota org/bln 800,000

Honorarium Tim Penyusunan Standar Akuntansi


Pemerintah Daerah dan Bagan Akun Standar Kegiatan
A.5.g Penyusunan Sistem Informasi Pengelolaan Keuangan
Daerah :

- Penanggung Jawab org/bln 1,500,000


- Ketua org/bln 1,300,000
- Sekretaris org/bln 1,200,000
- Koordinator org/bln 1,000,000
- Anggota org/bln 800,000

A.6 Honorarium Tim Pelaksana Evaluasi dan Penanganan


Masalah administrasi Keuangan dan Aset Daerah
Penanggung jawab Org/Bln 1,000,000
Ketua Org/Bln 900,000
Sekretaris Org/Bln 700,000
Koordinator Org/Bln 600,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 651
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
Anggota Org/Bln 500,000

A.7 Honorarium Pembinaan Pemberdayaan Masyarakat


dan Pemerintahan Desa
Honor Tim Pelaksana Kegiatan Musyawarah
Pembangunan Kecamatan/MUSRENBANGCAM
a. Ketua aktv 500,000
b. Wakil Ketua aktv 400,000
c. Sekretaris aktv 300,000
d. Anggota Org/Aktv 25,000

A.8 Honorarium Bidang IT


1 Honor Tenaga Teknis Komputer Org/Bln 2,250,000
2 Honor Tenaga Teknis Pemrograman Org/Bln 2,250,000
3 Honor Tenaga Teknis Jaringan Org/Bln 2,250,000
5 Honor Tenaga Analis Org/Bln 1,000,000

A.9 Honorarium Panitia / Tim Pelaksana Kegiatan Razia


Penyandang Masalah Sosial
a. Ketua Org/Aktv 300,000
b. Wakil Ketua Org/Aktv 250,000
c. Sekretaris Org/Aktv 250,000
d. Anggota Org/Aktv 200,000
e. Pembantu Pelaksana Org/Aktv 150,000
A.10 Honorarium Tim Inevetarisasi Dan penyelamatan Aset
- Ketua Org/bulan 500,000
- Wakil Ketua Org/bulan 400,000
- Sekretaris Org/bulan 400,000
- Anggota Org/bulan 300,000
A.11 Tim Implementasi Konsep Perubahan Akutansi
Penanggungjawab Org/bulan 1,500,000
- Ketua Org/bulan 1,300,000
- Sekretaris Org/bulan 1,200,000
- Koordinator Org/bulan 1,000,000
- Anggota Org/bulan 800,000

A.12 Honor Lain - lain


Honor / uang saku peserta sosialisasi / pelatihan /
1 pertemuan org/aktv 53,000
2 Petugas Rohaniwan org/aktv 200,000
3 Petugas Penempel Nomor Ujian org/aktv 40,000
4 Petugas Penerima Berkas org/aktv 50,000
5 Petugas Entry Data org/hari 50,000
6 Petugas Protokol org/aktv 50,000
7 Petugas Pengamanan org/aktv 50,000
8 Petugas Kebersihan org/hari 25,000
9 Pengemudi org/hari 50,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 652
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
10 Juru Pelihara Situs / Makam org/bln 300,000
11 Juru Kebersihan Musium org/bln 300,000
12 Honor Ahli Analis org/jam 27,500
13 Honor Ahli Program org/jam 27,500
14 Honor Ahli Integrator org/jam 27,500
15 Honor Pembantu Pegawai Pencatat Perkawinan (PP3) /tahun 500,000
16 Honor Pendamping dan Operator PKH org/aktivitas 97,500

17 Honor Pendukung Pelaksanaan Pembuatan Rencana /aktv 150,000


Definitif Kebutuhan Kelompok (RDKK) Pupuk Bersubsidi
18 Honor Petugas Raskin org 75,000
19 Honorarium Petugas Survey org/hari 50,000

20 Honorarium Tenaga Bantuan Instansi lain untuk


pelaksanaan Uji Petik
a. Tenaga POM TNI org 100,000
b. Tenaga POLRI org 100,000
c. Tenaga PPNS UPT LLAJ org/akt 100,000
d. Tenaga Teknis Kawasan Keselamatan Operasional org/akt 300,000
Penerbangan (KKOP) PNS UPT Bandara Blimbingsari
e. Tenaga Bantuan TNI/POLRI UNTUK Pembinaan Dan org/akt 100,000
Pengawasan Juru Parkir
21 Honor Tenaga Layout Terbitan/Layouter edisi 250,000
Honorarium Narasumber (Pakar/Praktisi/Pembicara
22 Khusus)untuk kegiatan org/jam 1,150,000
Seminar/Rakor/Sosialisasi/Diseminasi
23 Honorarium Peserta Dialog / Audiensi dengan Kepala Daer
Peserta Tingkat Desa (Perangkat Desa, BABINSA dan
a. org/aktivitas 100,000
BABINKAMTIBMAS)
b. Peserta dari Kecamatan (MUSPIKA) org/aktivitas 250,000

24 Honor Operator/Entry Sistem Informasi Administrasi


Kependudukan (SIAK)
- PNS / bulan 200,000
- Non PNS / bulan 200,000
25 Pelatihan Paskibraka
- Honor Peserta Paskibraka Kabupaten Org/Akt 50,000
- Honor Peserta Seleksi Paskibra Provinsi Org/Akt 150,000
- Honor Peserta Seleksi Paskibra Nasional Org/Akt 250,000
- Jasa Kebersihan Org/Hari 25,000
- Jasa Tenaga Medis Org/Hari 100,000
- Jasa Loundry /Kg 8,000
- Pelatih Paskibraka Org/Hari 150,000
- Koordinator Pelatih Org/Hari 175,000
- Komandan Kompi Pengibar dan Penurun Bendera
Org/Hari 175,000
Paskibraka
- Pengawal Paskibraka Org/Hari 150,000
- Jasa Narasumber Org/Jam 350,000
- Jasa Potong Rambut Putra Org/Hari 15,000
- Jasa Potong Rambut Putri Org/Hari 30,000
- Jasa Tenaga Rias Org/Akt 50,000
26 Honor Pengawas Parkir / bulan 750,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 653
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
27 Honor Memandikan Orang Gila orang/hari 75,000
28 Honor Tukang Cukur Orang Gila orang/hari 75,000
29 Tenaga Keamanan Kantor org/bln 750,000
30 Tenaga Penunjang Administrasi Perkantoran org/bln 1,000,000
31 Honor Pendamping Klinik UMKM org/bln 1,000,000
Honor Pendamping Manajemen Badan Usaha Milik Desa
32 org/bln 1,000,000
(BUMDes)
33 Honor Moderator /Aktifitas 300,000
34 Lay Aouter /bulan 750,000
35 Honor Penyusun Buletin/Majalah org/Bln/Keg. 1,000,000
36 Panitia/Pembantu panitia penyelenggara
a. Penanggung Jawab Oter 300,000
b. Redaktur Oter 200,000
c. Penyunting/Editor Oter 150,000
d. Pembuat Artikel Hal 75,000
37 Honor PPA ( Penjaga Pintu Air ) org/bln 750,000
38 Honor PEKARYA org/bln 750,000
39 Tenaga Administrasi org/bln 750,000

Semula Pelaksanaan Kegiatan WISMP LOAN Honorarium


40 Tim Pelaksanaan / Kepanitiaan PNS Menjadi Honorarium
Panitia Pelaksana Kegiatan WISMP

Ketua 300,000
Sekretaris 250,000
Anggota 200,000
40.1 Honorarium Penyaji/Narasumber :
- Honorarium Peserta (PNS/NON PNS) Org/Akt 500,000
- Honorarium Koordinator Tenaga Pendamping
Org/bln 2,000,000
Masyarakat (KTPM) / PNS / Non PNS
- Honorarium Tenaga Pendamping Masyarakat (TPM)
Org/bln 1,750,000
PNS/NON PNS
- Honorarium Peserta (PNS/NON PNS) Org/Akt 50,000
41 Honorarium Penyaji/Nara Sumber ( PNS/Non
OH PNS ) OH 200,000OH
42 Honorarium Peserta ( PNS / Non PNS ) OH 50,000
Honorarium Tenaga Pendamping Masyarakat ( PNS/Non
43 PNS ) OH OH 100,000OH
Belanja Pemberian Hadiah Lomba HIPPA
44 Belanja Trophi Buah 400,000
45 Uang Pembinaan Juara 1 Hippa 3,000,000
46 Uang Pembinaan Juara 2 Hippa 2,000,000
47 Uang Pembinaan Juara 3 Hippa 1,000,000
48 Honorarium Tim Pencetakan Masal SPPT PBB P2
1 Ketua Aktivitas 5,000,000
2 Wakil Ketua Aktivitas 4,500,000
3 Sekretaris Aktivitas 4,000,000
4 Anggota Aktivitas 3,500,000
5 Pembantu Umum Aktivitas 2,500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 654
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
49 Tambahan penghasilan Berdasarkan Kondisi Kerja
50 Koordinasi PBB di Desa / Kelurahan org/Bln 250,000
51 Honor RT org/Bln 100,000
52 Honor RW org/Bln 100,000
53 Honor Kader Posyandu org/th 200,000
Honor Panitia Lomba Kesadaran Hukum Peraturan Per-
54 UU-an
Honorarium Panitia KADARKUM
Honorarium PNS
a. Pengarah Org/Hari 750,000
b. Ketua Org/Hari 600,000
c. Sekretaris Org/Hari 550,000
d. Bendahara Org/Hari 450,000
e. Anggota Org/Hari 400,000
Honorarium Non PNS Kegiatan Lomba Kesadaran Hukum : /Akt 105,000
Honorarium Narasumber Kegiatan Lomba Kesadaran Huku /Akt 500,000
Pemenang Lomba Kegiatan Lomba Kesadaran Hukum:
a. Juara I /Kelompok 1,500,000
b. Juara II /Kelompok 1,250,000
c. Juara III /Kelompok 1,000,000
d. Juara IV /Kelompok 750,000
e. Juara V /Kelompok 500,000

54.1 Honor Panitia Sosialisasi/Pemantapan Peraturan


Perundang-Undangan
'a. Pengarah Org/Hari 750,000
'b. Ketua Org/Hari 600,000
'c. Sekretaris Org/Hari 550,000
'd. Bendahara Org/Hari 450,000
'e. Anggota Org/Hari 400,000
Uang saku peserta Sosialisasi Peraturan Perundang-
Undangan: Org/Hari 50,000
Honor Tim Pengelola JARINGAN DOKUMENTASI DAN
54.2
INFORMASI HUKUM (JDIH)
- a. Penanggung Jawab org/Bln 1,500,000
- b. ketua org/Bln 1,250,000
- c. Sekretaris org/Bln 1,000,000
- d. Anggota org/Bln 800,000
Tenaga Ahli / Operator /Jam 27,500
55 Honorarium Pelaksanaan Kegiatan BEC
-Peserta BEC/ Performing Art dari luar Kab/Prop. org/Akt 500,000
-Peserta BEC org/Akt 350,000
-Juri BEC dari Luara Kabupaten org/Akt 1,000,000
-Pendukung ( Penjaga Stand ) org/Akt 250,000
Hadiah Uang
-Peserta Favorit BEC org/Atv 500,000
56 Honorarium Jasa Analis Laborat org/bln 675,000
57 Honorarium Penata Radiologi org/bln 675,000
58 Honorarium Jasa Rekam Medik org/bln 675,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 655
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)

59 Honorarium Panitia pelaksana Kegiatan LHKP ( Laporan


Harta Kekayaan Penyelenggara Negara )
-Ketua Org/Atv 2,500,000
-Wakil Ketua I Org/Atv 2,350,000
-Wakil Ketua II Org/Atv 2,350,000
-Sekretaris Org/Atv 2,000,000
-Wakil Sekretaris Org/Atv 1,800,000
-Anggota Org/Atv 1,500,000
-User Aplikasi Org/Atv 1,250,000
60 Tenaga Survey org/responden 10,000

61 Honorarium Nara Sumber ( pakar/praktisi/pembicara org/jam 1,200,000


khusus) untuk kegiatan seminar/rakor/sosialisasi/disiminasi
Honor harian Lepas Tenaga bantu Penyuluh Pertanian
62 org/bln 800,000
( THL TB PP)
63 Honor Tim Pokja PUAP Kabupaten /bln 170,000
Honor Tenaga Bantuan TNI / POLRI dalam rangka
64 Pembinaan dan Pengawasan Juru Parkir org/aktv 100,000

Honorarium Non PNS Kegiatan Terlaksananya Sara Sehan


65 Bela Negara

= Peserta Org/Aktv 100,000


= Moderator Org/Aktv 350,000
66 Honorarium Non PNS KegiatanPelatihan PASKIBRAKA
2014
- Tenaga Potong Rambut Per Org 15,000
- Tenaga Potong Rambut Peserta Perempuan Per Org 20,000
- Tenaga Rias Peserta Perempuan Per Org 15,000
- Jasa Laundry Per Org 7,000
- Komanda Danki Paskibraka Per Org 150,000
- Jasa Narasumber Paskibraka Per Org 350,000
Honorarium Non PNS Kegiatan Peningkatan Rasa
67 Solidaritas dan Ikatan Sosial di Kalangan Masyarakat

- Peserta Per Org 200,000


- Moderator Org/Jam 250,000
Honorarium (Non PNS) Tim Kesesian Bulan Bhakti Gotong
Royong Masyrakat (BBGRM dan HKG-PKK) /OH 200,000

68 Honorarium Pelaksana Kegiatan Pemberdayaan Kader


PKK
= Ketua /OH 200,000
=Sekretaris /OH 150,000
- Anggota /OH 100,000
69 Honorarium Tim Juri /OH 200,000
69.1 Honorarium Tim Juri Kali Bersih Org/aktv 350,000
69.2 Honorarium Tim Juri Pesantren Berseri Org/aktv 350,000
69.3 Honorarium Tim Pembina dan Penilai Sekolah Adiwiyata Org/aktv 350,000
Honorarium Pelaksana kegiatan penyusunan Buku Status
69.4 Lingkungan Hidup Daerah (SLHD)
- Pengarah OB 500,000
- Ketua OB 500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 656
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Sekretaris OB 400,000
- Anggota OB 300,000

69.5 Honorarium Tim Penyelenggara Sistem Informasi


Lingkungan Hidup (SILHD)
- Pengarah OB 500,000
- Ketua OB 400,000
- Sekretaris OB 350,000
- Penanggung Jawab data OB 300,000
- Administrator OB 750,000
- Operator Bidang OB 300,000
1.Honorarium (PNS) Kegiatan Peningkatan Pelayanan
70 Pengadaan Barang dan Jasa Pemerintah Sub Kegiatan
Tim Pembina Jasa Kontruksi

- Pengarah org/bln 1,000,000


- Ketua org/bln 750,000
- Wakil Ketua org/bln 500,000
- Sekretaris org/bln 650,000
- Anggota org/bln 500,000
- Sekretariat/ Teknis org/bln 350,000
2. Honorarium (Non PNS) :
- Pembina (Bupati) org/bln 1,500,000
- Pengarah (Wakil Bupati) org/bln 1,000,000
Honor narasumber rapat koordinasi sinergi informasi dan
71 Komunikasi Pembangunan
OJH 500,000
Honor Kegiatan Peningkatan Kegiatan Keagamaan di
72 Lingkungan Pemerintah Daerah, Istighotsah dan Tahlil :

- Pembicara Kegiatan Istighotsah org/aktv 500,000


- Huffad / Hufadlo org/aktv 250,000
- Pembicara Kegiatan Tahlil org/aktv 500,000
Honor Kegiatan Peningkatan Kegiatan Keagamaan di
73 Lingkungan Pemerintah Daerah, Pengajian Hari Rabu:

- Pembicara Pengajian org/aktv 250,000


- Pembicara Pengajian Rabu Malam Kamis org/aktv 250,000
- Imam Sholat Rawatib org/aktv 75,000
- Pemandu Acara Pengajian org/aktv 75,000
Honor Kegiatan Peningkatan Kegiatan Keagamaan Bulan
74
Ramadhan di Lingkungan Pemerintah Daerah :
- Imam Sholat Taraweh org/aktv 200,000
- Bilal Sholat Taraweh org/aktv 75,000
Honor Finalisasi Perubahan Standart Harga 2015 Kegiatan
75
Penyusunan Standart Harga
- Ketua Org/akt 1,500,000
- Wakil Ketua Org/akt 1,300,000
- Anggota Org/akt 1,000,000
76 Honorarium Tim Pengelola LPSE (Pembangunan)
- Penanggung jawab Org/bln 1,500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 657
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Pembina Org/bln 1,300,000
- Pengarah Org/bln 1,100,000
- Ketua Org/bln 1,600,000
- Sekretaris Org/bln 1,400,000
- Anggota bidang-bidang Org/bln 1,170,000
- Anggota sekretariat Org/bln 780,000
Honorarium Tim Penyusun Rencana Kerja (Renja) dan
76.1
Rencana Strategis (Renstra) SKPD (Pembangunan)
- Ketua Org/akt 350,000
- Sekretaris Org/akt 250,000
- Anggota Org/akt 200,000
76.2 Honorarium Tim Pembina Jasa Konstruksi
1. Pembina org/bln 1,500,000
2. Pengarah org/bln 1,000,000
3. Ketua org/bln 750,000
4. Wakil Ketua org/bln 500,000
5. Sekretaris org/bln 650,000
6. Anggota org/bln 500,000
7. Tim Teknis org/bln 350,000
77 Honorarium Tim Penata usahaan Keuangan
1. Pengarah org/bln 1,300,000
2. Ketua org/bln 1,200,000
3. Wakil I org/bln 1,100,000
4. Wakil II org/bln 1,100,000
5. Sekretaris org/bln 1,050,000
6. Koordinator org/bln 950,000
7. Penatausahaan Keuangan org/bln 700,000
8. Pengadministrasian org/bln 250,000
Kegiatan Pelatihan Pengadaan barang / Jasa,
78 Penatausahaan Keuangan Desa dan Manajemen Aset
Desa :
- Ketua Org/akt 500,000
- Wakil Ketua Org/akt 400,000
- Sekretaris Org/akt 300,000
- Anggota Org/akt 200,000
b. Honorarium Moderator Org/akt 250,000
c. Honorarium Peserta Org/akt 53,000
d. Jasa Tenaga Ahli/Instruktur/Narasumber / 45 menit 500,000
79 Honorarium Kegiatan Tour de Ijen
Honorarium PNS
-Honorarium Panitia Pelaksana Org/Akt 250,000
-Honorarium Non PNS
Honorarium Tenaga Ahli
Tenaga Ahli Internasional
-Race Director org/hr 7,500,000
-International Commisaire org/hr 7,500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 658
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
Tenaga Ahli Nasional
-Panitia Teknis PB ISSI/National Commsaire org/hr 550,000
-Marshal Nasional org/hr 350,000
-Teknisi Sign Posting org/hr 350,000
-Mechanic Neutral Servis org/hr 250,000
-MC Lomba org/hr 1,500,000
-Staf EO org/hr 500,000
- Driver org/hr 200,000
Tenaga Ahli Lokal
-Race Doctor org/hr 1,500,000
-Paramedic org/hr 350,000
-Liasion Officer org/hr 250,000
-Tenaga Stagging org/hr 250,000
-Stage Officers org/hr 350,000
Pemberian Hadiah Uang kegiatan tour d' ijen
Perorangan
- Juara I org 25,000,000
- Juara II org 20,000,000
- Juara III org 15,000,000
- Juara IV org 10,000,000
- Juara V org 7,000,000
- Beregu
- Juara I regu 50,000,000
-Juara II regu 40,000,000
-Juara III regu 30,000,000
- Juara IV org 25,000,000
-Juara V org 20,000,000
-Klasemen Umum Perorangan org 25,000,000
-Klasemen umum beregu org 33,000,000
Pemberian Hadiah Barang kegiatan tour d' ijen
- Medali 11 etepe Perorangan buah/ha 160,000
-Medali 11 etape Beregu buah/ha 160,000
Honorarium Tim Pertimbangan Penyelesaian
Permasalahan Kepegawaian ( T-P3 K )
-Ketua Org/Akt 2,000,000
=Wakil Ketua Org/Akt 1,500,000
-Sekretaris Org/Akt 1,500,000
-Wakil Sekretaris Org/Akt 1,000,000
-Anggota Org/Akt 1,500,000
-Sekretariat Org/Akt 200,000
80 Honorarium THLPenunjang Administrasi Org/bln 1,000,000
81 Honorarium THL Satpol PP Org/bln 1,000,000
82 Honorarium THL Petugas Kebersihan Org/bln 1,000,000
83 Honorarium THL Umum / Setara Org/bln 1,000,000
84 HONORARIUM PETUGAS UPACARA
a. Honoraium Petugas Upacara Org/aktv 250,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 659
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
b. Honorarium Perwira Upacara Org/aktv 250,000
c. Honorarium Pembaca Do'a Org/aktv 100,000
d. Honorarium Petugas MC/Pembawa Acara Org/aktv 50,000
e. Honorarium Petugas pengibar Bendera Org/aktv 50,000
f. Honorarium Petugas Pembaca Teks Org/aktv 50,000
g. Honorarium Tim Aubade Tim 750,000
h. Belanja Karangan Bunga Untuk Ziarah Buah 250,000
i. Belanja Bunga Tabur Keranjang 50,000
Honorarium Penanganan masalah strategis yang
85 menyangkut tanggap darurat ( PemantapanTaruna Siaga
Bencana (TAGANA)
1. Honorarium Panitia Pelaksanaan Kegiatan org 600,000
2. Honorarium Nara Sumber/Tenaga Ahli org/jam 300,000
- Honor Pelatih / Pengajar org/45 menit 250,000
3. Honorarium Peserta Org/Hari 50,000
4. Honor Anggota TAGANA Org/bln 250,000
Honorarium Peningkatan Kualitas SDM Kesejahteraan
Sosial masyarakat ( Pelatihan Pekerja Sosial Masyarakata/
86
PSM) pelatihan Karang Taruna,Seleksi Karang taruna,
Pelatihan Tenaga Kerja Sosial Kecamatan/TKSK)
1. Honorarium Panitia Pelaksanaan Kegiatan org 600,000
2. Honorarium Nara Sumber/Tenaga Ahli
- Honor Pelatih / Pengajar org/45 menit 250,000
3. Honorarium Peserta Org/Hari 50,000
Honorarium Fasilitasi manajemen usaha bagi keluarga
87 miskin (PKH)

1. Honorarium Panitia Pelaksanaan Kegiatan org/hari 75,000


2. Honorarium Nara Sumber/Tenaga Ahli
- Honor Pelatih / Pengajar org/45 menit 250,000
3. Honorarium Pendamping org/hari 75,000
4. Honorarium Peserta org/hari 50,000
Pendidikan dan pelatihan ketrampilan berusaha bagi eks
88
penyandang penyakit sosial ( PSK )
1. Honorarium Panitia Pelaksanaan Kegiatan org 600,000
2. Honorarium Nara Sumber/Tenaga Ahli
- Honor Pelatih / Pengajar org/45 menit 250,000
3. Honorarium Peserta org/hari 50,000
4. Honorarium entry data org/hari 50,000
5. Hororarium sosialisasi dan pendataan org/hari 50,000
89 Pendidikan dan pelatihan ketrampilan bagi penyandang cac
1. Honorarium Panitia Pelaksanaan Kegiatan org 400,000
2. Honorarium Nara Sumber/Tenaga Ahli
- Honor Pelatih / Pengajar org/45 menit 250,000
3. Honorarium Peserta org/hari 50,000
Honorarium Kegiatan Fasilitasi penyelesaian Prosedur
90
Pemberian Perlindungan Hukum dan jamsotek

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 660
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
Honorarium panitia Pelaksana Kegiatan ( Dewan
pengupahan Kabupaten )
a. Honorarium Penasehat org/aktv 800,000
b. Honorarium Ketua org/aktv 750,000
c. Honorarium Sekretaris I org/aktv 700,000
d. Honorarium Anggota org/aktv 500,000
91 Honorarium Pegawai Honorer / Tidak Tetap
a. Honorarium Pembina org/aktv 900,000
b. Honorarium Wakil Ketua org/aktv 700,000
c. Honorarium Sekretaris II org/aktv 600,000
d. Honorarium Sekretaris III org/aktv 600,000
e. Honorarium Anggota org/aktv 600,000
Honorarium Kegiatan Sosialisasi berbagai peraturan
92
pelaksanaan tentang ketenagakerjaan
1. Honorarium Tenaga Ahli/Instruktur/Nara Sumber
-Konsiliator org/jam 300,000
2. Transport Peserta org/hari 50,000
Honorarium Kegiatan Pengembangan HI yang harmonis,
93
dialogis,adil dan bermatabat
1. Honorarium Tenaga Ahli/Instruktur/Nara Sumber
-Konsiliator org/jam 300,000
2. Honorarium Peserta org/hari 50,000
Honorarium Kegiatan Fasilitasi penyelesaian prosedur
94
penyelesaian perselisihan HI
1. Honorarium Tenaga Ahli/Instruktur/Nara Sumber
-Konsiliator org/jam 300,000
Honorarium Fasilitasi Penyelesaian prosedur
95
Penyelesaian Perselisihan kasus Hubungan Industrial
- Honorarium Pengarah Org/Atv 850,000
- Honorarium Koordinator Org/Atv 800,000
- Honorarium Mediator Hubungan Industrial Org/Atv 750,000
- Honorarium Pencatat Org/Atv 500,000
- Honorarium Sekretariat Org/Atv 500,000
- Honorarium Konsiliator Org/Atv 750,000
Honorarium Fasilitasi Penyelesaian Prosedur Pemberian
95.1
Perlindungan Hkm & Jaminan Sosial Ketenagakerjaan
- Honorarium Pengarah Org/Atv 750,000
- Honorarium Koordinator Org/Atv 700,000
- Honorarium Pengawas Ketenagakerjaan Org/Atv 600,000
- Honorarium Sekretariat Org/Atv 500,000

96 Honorarium Non PNS/ Honorarium Petugas Penyelesaian


Perselisihan Hubungan Industrial
Honorarium Konsiliator Hubungan Industrial Org/Atv 750,000
97 Honorarium Pelatihan Bahasa dan Tata Boga
1. Honorarium Panitia Pelaksanan Kegiatan
a. Ketua org/Aktv 300,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 661
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
b. Sekretaris org/Aktv 250,000
c. Anggota org/Aktv 200,000
2. Honorarium Pelatih / Tenaga Pengajar org/45 menit 300,000
3. Honorarium Peserta org/Hari 50,000
98 Honorarium Pelatihan Transmigrasi
1. Honorarium Panitia Pelaksana Kegiatan
- Honoraium Ketua org/Aktv 350,000
- Honorarium Sekretaris org/Aktv 300,000
- Honorarium Anggota org/Aktv 200,000
2. Honorarium Pelatih / Tenaga Pengajar org/45 menit 250,000
3. Honorarium Peserta ( Catrlon transmigran ) org/hari 50,000
99 Honoraium Manajemen Organisasi Olah raga
1. Honorarium /Transmport/ Trainee peserta org/keg 100,000
2. Honorarium Pelaksana Kegiatan
-Ketua org/keg 1,000,000
-Wakil Ketua org/keg 750,000
-Sekretaris org/keg 1,000,000
-Wakil Sekretaris org/keg 750,000
-Bendahara org/keg 1,000,000
-Wakil Bendahara org/keg 750,000
-Anggota org/keg 500,000
100 Honorarium Tim Tinjau Lapang org/bulan 750,000
101 Honor Panitia Lomba Cipta Menu org/aktv 50,000
102 Honor Juri Lomba Cipta Menu paket 2,300,000
103 Honor Pegawai Outlet UMKM paket 300,000
104 Honorarium Tim Desk penerapan e-KTP
-Pengarah ( Bupati ) Aktv 1,000,000
-Pembina ( Sekda ) Aktv 500,000
-Ketua Tim (Kadispenduk) Aktv 400,000
-Sekretaris ( Kabid.Adminduk) Aktv 400,000
-Koordinator ( Kepala Seksi ) Aktv 200,000
-Anggota ( Staf Dispenduk ) Aktv 150,000
105 Honorarium Tim Kerja Penerapan e-KTP PNS
-Ketua Tim ( Camat ) Aktv 250,000
-Sekretaris ( Kasi Pem.) Aktv 200,000
-Petugas Penerapan e-KTP org/bulan 475,000
-Petugas Pengamanan antrian org/bulan 300,000
-petugas mobilitas dan back up data org/bulan 300,000
106 Honorarium Tim Kerja/Panitia Penerapan e-KTP Non PNS
-Petugas Penerapan e-KTP org/bulan 475,000
-Petugas Mobilitas Masy. Desa org/bulan 175,000
Belanja Jasa Pesuruh / Kurir
-Jasa distribusi surat panggilan penerapan e -KTP lembar 50
107 Pembinaan LSM dan Wartawan
-Honorarium Tenaga Ahli/Instruktur/Narasumber org/aktv 500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 662
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
-Honorarium Moderator org/aktv 400,000
-Honorarium Peserta org/aktv 200,000
Fasilitasi Pencapaian Halaqoh dan berbagai forum
108
keagamaan lainnya
1. Honorarium PNS
Honorarium Panitia Pelaksanan Kegiatan
-Ketua org/akt 750,000
-Sekretaris org/akt 650,000
-Anggota org/akt 500,000
- Honor Peserta org/akt 350,000
- Honor Moderator org/akt 400,000
- Honor Narasumber org/jam 500,000
- Honor Peserta Non PNS org/akt 250,000
109 Revitalisasi dan aktualisasi nilai-nilai pancasila
honorarium PNS
honorarium Panitia Pelaksana Kegiatan
– ketua org/akt 750,000
– sekretaris org/akt 650,000
– anggota org/akt 500,000
- Honor Moderator Org/Akt 400,000
- Honor Peserta Org/Akt 350,000
- Honor Moderator Org/Jam 500,000
- Honor Peserta Non PNS Org/Akt 200,000
- Honor Narasumber Org/Jam 500,000
Pembinaan Kesadaran Masyarakat akan Ketertiban dan
110
Keamanan
1. Honoraium PNS
Honoraium Panitia Pelaksana Kegiatan
,-Ketua org/aktv 500,000
-Sekretaris org/aktv 450,000
-Anggota org/aktv 400,000
Anggota Pengarah org/aktv 1,000,000
2.Honoraium NON PNS
-Honorarium Tenaga Ahli/Instruktur/Narasumber org/aktv 500,000
Honoraium Panitia Pelaksana Kegiatan
-Panitia Pengarah org/aktv 900,000

111 -Honor Juru Parkir org/bln 518,000

112 Honor Pengawas Juru Parkir org/bln 818,000

113 Honorarium Perawat PONKESDES dengan rincian:


- Dari APBD (Rp. 250.000,-)
- Sharing dari Propinsi (Rp. 250.000,-) org/bln 500,000
-Honorarium Tenaga Honorer Paramedis / Tenaga
org/bln 500,000
Kesehatan
-Honorarium Tenaga Honorer Administrasi org/bln 500,000
-Honorarium Tenaga Kebersihan / Jasa Kebersihan /
org/bln 500,000
Cleaning Service

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 663
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
Honorarium Jasa Loundry / Tenaga Loundry org/bln 350,000
-Tunjangan Pelayanan Ponkesdes diluar jam kerja
org/bln 500,000
pemerintah

114 MANAGEMEN KEPEMUDAAN DISPORA


1. Honorarium panitia pelaksana kegiatan
-Ketua org/akt 500,000
-Ketua- org/akt 400,000
-Sekretaris org/akt 300,000
-Bendahara org/akt 250,000
-Anggota org/akt 200,000
115 Honor instruktur/narasumber pelatihan org/akt 500,000
116 Honor juri/tim penilai lomba karya tulis org/akt 250,000
117 Honor peserta pelatihan org/akt 100,000

118 BELANJA BAHAN/MATERIAL


1 Material pelatihan keterampilan org/akt 100,000

HONORARIUM PANITIA PELAKSANA KEGIATAN BINTEK


119
PENYUSUNAN APBD DAN PERUBAHAN APBD
PNS
- Penanggung jawab org/akt 1,250,000
- Ketua org/akt 1,200,000
- Wakil ketua org/akt 1,100,000
- Sekretaris org/akt 1,000,000
- Koordinator org/akt 700,000
- Anggota org/akt 600,000

NON PNS
- Anggota org/akt 130,000
120 MONITORING DAN EVALUASI ALOKASI DANA DESA
1. Honor Tim fasilitasi kabupaten pelaksanaan Alokasi
Dana Desa
• Penanggung jawab/Bupati /tahun 3,000,000
• Pengarah/Wakil Bupati /tahun 2,750,000
• Koordinator/Sekda /tahun 2,500,000
• Ketua/Asisten Adm. Pemerintahan /tahun 2,250,000
• Sekretaris/Ka. Badan /tahun 2,000,000
• Anggota /tahun 1,750,000
2. Honor Tim Pendamping Kecamatan
•Ketua /tahun 1,500,000
•Sekretaris /tahun 1,250,000
•Anggota /tahun 1,000,000

3 Honorarium Panitia Pelaksana Pelatihan Aparatur


Pemerintahan Desa

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 664
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
Honorarium PNS
•Ketua org/akt 500,000
•Wakil Ketua org/akt 400,000
•Sekretaris org/akt 300,000
.Anggota DAN EVALUASI PEMILIHAN KEPALA org/akt 200,000
MONITORING
121 DESA
1. Honor Pelaksanaan Pelantikan Pilkades
•Ketua /aktifitas 250,000
•Sekretaris /aktifitas 250,000
•Anggota /aktifitas 250,000
2. Honor Tim Pemantau Pilkades
•Ketua /aktifitas 250,000
•Sekretaris /aktifitas 200,000
•Anggota /aktifitas 150,000

122 Honorarium Pelaku PNPM Mandiri Perdesaan


• Petugas/Pengurus BKAD Ob 50,000
• Petugas/Pengurus BP UPK Ob 50,000
• Petugas/Pendamping lokal Ob 37,500
• Petugas/KPMD Ob 37,500
123 PERCEPATAN PENANGGULANGAN KEMISKINAN

1. Honorarium Tim Percepatan Penanggulangan


Kemiskinan Kabupaten Banyuwangi
• Ketua Org/Keg 400,000
• Wakil Ketua Org/Keg 350,000
• Sekretaris Org/Keg 300,000
• Anggota Org/Keg 250,000
Non PNS
- Pembina org/aktv 750,000
- Penanggungjawab org/aktv 500,000
2. Pelaksana Kecamatan
• Koordinator (Sekcam/Kasi di Kec) Org/Keg 200,000
• Anggota (Sekkel/Sekdes) Org/Keg 150,000
• Anggota (KPMD/KPMK) Org/Keg 500,000

124 PELATIHAN KETRAMPILAN MANAJEMEN BADAN


USAHA MILIK DESA
1.Honorarium Panitia Pelaksana Kegiatan
• Ketua Org/Keg 500,000
• Wakil Ketua Org/Keg 400,000
• Sekretaris Org/Keg 300,000
• Anggota Org/Keg 200,000

Honor Pembantu Pelaksana Kegiatan Gabungan


125 Org/Keg 75,000
Organisasi Wanita (GOW)

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 665
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
126 Awak Radio
1 Manajer Ob 2,000,000
2 Programer Ob 2,000,000
3 Penyiar Ob 1,000,000
4 Tekhnisi Ob 1,000,000
5 Musik Direktor Ob 1,500,000
6 Reporter Ob 1,000,000
127 PENGELOLA INFORMASI DAN DOKUMENTASI (PPID)
1 Atasan PPID /3 Bulan 2,500,000
2 Ketua PPID /3 Bulan 2,000,000
3 Sekretaris PPID /3 Bulan 1,750,000
4 Pengelola Sekretariat
• Pejabat Eselon III /3 Bulan 1,500,000
• Pejabat Eselon IV /3 Bulan 1,250,000
• Staf Golongan III /3 Bulan 500,000
• Staf Golongan II /3 Bulan 400,000
• THL/Operator /3 Bulan 300,000
5 Ketua Bidang /3 Bulan 1,250,000
6 Pengelola Bidang
• Pejabat Eselon IV /3 Bulan 1,000,000
• Staf Golongan III /3 Bulan 500,000
• Staf Golongan II /3 Bulan 400,000
• THL/Operator /3 Bulan 300,000
128 Petugas Penjaga Pelintasan Kereta Api Sebidang OH 50,000
129 Honor TAGANA dan TKSK Ob 125,000
130 Honor Pendampingan Korban Org/Akt 100,000

Honorarium Peningkatan edukasi dan Komunikasi


131
Masyarakat di bidang lingkungan

Honor Praktisi/Pembicara 400,000


- org/45 mnt
Khusus/Narasumber/Workshop Adiwiyata Kabupaten

- Honor Moderator org/45 mnt 250,000


- Honor Tim Seleksi dan Evaluasi Adiwiyata org/Aktv 150,000

- Honor tim penilai verifikasi dokumen dan lapangan Org/Aktv 350,000


sekolah Adiwiyata sekolah Adiwiyata menuju predikat
- Uang pembinaan
Provinsi /Sekolah 5,000,000
- Uang pembinaan sekolah Adiwiyata menuju predikat
Nasional /Sekolah 7,500,000
- Uang pembinaan sekolah Adiwiyata menuju predikat
Nasional /Sekolah 10,000,000

Honorarium Peningkatan peran serta masyarakat dalam


132 perlindungan dan konservasi SDA (Banyuwangi hijau dan
bersih)
- Honor Panitia Kegiatan org/Aktv 200,000
- Honor tim juri lomba Banyuwangi hijau dan bersih org/Aktv 350,000
- Honor Peserta (Non PNS) org/Aktv 150,000

- Lomba pesantren berseri

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 666
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
a. Juara I /Pesantren 15,000,000
b. Juara II /Pesantren 12,500,000
c. Juara III /Pesantren 11,000,000
d. Juara harapan I /Pesantren 10,000,000
e. Juara harapan II /Pesantren 8,500,000
f. Juara harapan III /Pesantren 7,500,000
- Lomba Kampung berseri (Kader Lingkungan)
a. Juara I /Desa 15,000,000
b. Juara II /Desa 12,500,000
c. Juara III /Desa 10,000,000

133 Honorarium Panitia Pelaksana Kegiatan Tim Penyusunan


RAD MDGs
Ketua Org / Akt 1,000,000
Wakil Ketua Org / Akt 900,000
Sekretaris Org / Akt 750,000
Ketua Pokja Org / Akt 500,000
Sekretaris Pokja Org / Akt 400,000
Anggota Pokja Org / Akt 325,000

134 Honorarium Panitia Pelaksana Kegiatan Validasi PPLS 2011


Penanggungjawab Kecamatan (Camat) Org / Akt 400,000
Koordinator Kecamatan (Sekretaris Kecamatan) Org / Akt 350,000
Anggota (Kasi PMD) Org / Akt 300,000
Penanggungjawab Desa / Kelurahan (Kepala Desa / Kelura Org / Akt 250,000
Koordinator Desa / Kelurahan (Sekretaris Desa / Kelurahan) Org / Akt 200,000
Fasilitator validasi Org / Akt 1,500,000
Petugas survey Org/responden 3,200
Petugas entry data Org / Akt 750,000
Honor Non PNS
Tenaga Ahli Laboratorium Org/bulan 1.000.000
Honor PNS
Panitia kegiatan pelatihan sampling Org/aktv 150,000
Peserta kegiatan pelatihan sampling Org/aktv 100,000
Relawan lingkungan Org/aktv 300,000

135 Honorarium Panitia Pelaksana Kegiatan Monitoring,


Evaluasi dan Pelaporan Pro Poor Award
- Ketua org/aktv 400,000
- Wakil Ketua org/aktv 350,000
- Sekretaris org/aktv 300,000
- Anggota Profil Desa/Kelurahan sesuai Data Dasar
Pendataan org/aktv 250,000
136 Keluarga
Honorarium Pokja Profil Desa Tingkat Kabupaten
• Honorarium Non PNS :

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 667
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Penanggung Jawab/Bupati /tahun 1.500.000
• Honorarium PNS :
- Ketua/Kepala Badan /tahun 1.250.000
- Sekretaris/Kabid.Pemdes /tahun 1.000.000
- Anggota /tahun 750,000
137 Honorarium Pokja Profil Desa Tingkat Kecamatan
Honorarium PNS
-Penanggung Jawab/Camat /tahun 750,000
-Ketua/Sekcam /tahun 600,000
-Sekretaris/Kasie PMD /tahun 500,000
-Anggota /tahun 500,000
138 Honorarium Pokja Profil Desa Tingkat Desa/Kelurahan
Honorarium PNS
-Ketua/Sekdes /tahun 500,000
Honorarium Non PNS
-Penanggung Jawab/Kades/Lurah /tahun 600,000
-Ketua/Sekdes /tahun 500,000
-Anggota /tahun 400,000
-Entry Data Dasar Keluarga - /KK 3,000
-Pendataan Data Dasar Keluarga - /KK 7,500

139 Kegiatan Verifikasi Anggaran Belanja Daerah


Honorarium Panitia Pelaksana Kegiatan
-Penanggung Jawab Ob 900,000
-Ketua Ob 800,000
-Wakil Ketua Ob 700,000
-Anggota Ob 550,000

Honorarium Non PNS


-Anggota Ob 150,000

140 Honorarium TIM Persiapan Pengadaan Tanah/Pelaksana


Pengadaan Tanah
Ganti Kerugian Tanah s.d Rp. 10 Miliar
- Ketua Merangap Anggota OB/Paket 1,600,000
-Sekretaris merangkap Anggota OB/Paket 1,300,000
-Anggota OB/Paket 1,100,000
-Sekretariat OB/Paket 800,000

141 Honorarium Tim Reformasi Birokrasi/ Honrarum Pantia


Pelaksana Kegiatan
Tim Pengarah
- Ketua org/Akt 500,000
- Wakil Ketua org/Akt 400,000
- Sekretaris org/Akt 350,000
- Anggota org/Akt 200,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 668
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
Tim Pelaksana
- Ketua org/Akt 350,000
- Wakil Ketua org/Akt 300,000
- Sekretaris org/Akt 275,000
- Anggota org/Akt 250,000

142 Honorarium Tim Monev Kinerja SKPD


Honorarium Panitia Pelaksana Kegiataan
- Ketua ob 1,500,000
- Wakil Ketua ob 1,250,000
- Wakil Ketua 2 ob 1,250,000
- Sekretaris ob 1,000,000
- Anggota ob 500,000
Honorarium PNS
-Honorarium Tenaga Ahli/Instruktur/Nara Sumber org/45 menit 500,000
-Honorarium Moderator org/ha 250,000
-Honorarium Peserta org/ha 100,000
Honorarium Non PNS
-Honorarium Tenaga Ahli/Instruktur/Nara Sumber org/45 menit 500,000
-Honorarium Moderator org/ha 250,000
-Honorarium Peserta org/ha 100,000
-Honor/Insentif GTT/PTT ob 176,650

143 Honorarium petugas pengamanan Pilkada


Honorarium PNS
- Petugas Linmas Posko Kecamatan org/Aktv 300,000
- Petugas Linmas Posko Kelurahan org/Aktv 250,000

Honorarium Non PNS


Honorarium Petugas Linmas
- Petugas Linmas Posko Kecamatan org/Aktv 300,000
- Petugas Linmas Posko Kelurahan org/Aktv 250,000

144 Honorarium Tim Implementasi Konsep Perubahan Akutansi


Penanggung Jawab ob 1,500,000
Ketua ob 1,300,000
Sekretaris ob 1,200,000
Koordinator ob 1,000,000
Anggota ob 800,000

Pembinaan Kesadaran Masyarakat akan ketertiban dan


145
keamanan
Honorarium PNS
Honorarium Panitia Pelaksana
Ketua org/Aktv 1,000,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 669
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
Sekretaris org/Aktv 900,000
Anggota org/Aktv 500,000
Peserta org/Aktv 250,000

Honorarium Non PNS


Honorarium Tenaga Ahli
Moderator org/Aktv 250,000
Peserta org/Aktv 250,000

Honorarium POKJA Sertifikasi Hak Atas Tanah Nelayan


146
dan Usaha Penangkapan Ikan sekala kecil

1. POKJA
- Pengarah Org/Keg 2,000,000
- Ketua Org/Keg 1,500,000
- Anggota Org/Keg 1,500,000
II. Sekretaris POKJA
- Ketua Org/Keg 1,500,000
- Anggota Org/Keg 1,000,000
III. Petugas Lapangan
- Petugas Utama Kecamatan Org/Keg 1,500,000
- Petugas Utama Desa/Kelurahan Org/Keg 1,000,000
- Pembantu Pelaksana Lapangan Org/Keg 400,000

147 Kordinasi Forum - Forum Diskusi Politik


Honor Non PNS
- Narasumber Org/Aktv 500,000
- Peserta Org/Aktv 150,000
- Moderator Org/Aktv 400,000

148 Penyusun Data Base Partai Politik


Honor PNS
- Ketua Org/Aktv 500,000
- Sekretaris Org/Aktv 400,000
- Anggota Org/Aktv 350,000
Honor Non PNS
- Honor Tim Pelaksana Org/Aktv 200,000
149 Monitoring Evaluasi dan Pelaporan Bantuan Sosial
Honor Non PNS
- Ketua Org/Aktv 400,000
- Sekretaris Org/Aktv 350,000
- Anggota Org/Aktv 300,000
- Narasumber Org/Aktv 250,000

150 Fasilitasi Penyelesaian Perselisihan Partai Politik


Honor PNS

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 670
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
-Ketua Org/Aktv 400,000
- Sekretaris Org/Aktv 350,000
- Anggota Org/Aktv 300,000
- Narasumber Org/Aktv 400,000
Non PNS
- Narasumber Org/Aktv 400,000
- Peserta Org/Aktv 150,000
- Moderator Org/Aktv 300,000

151 Sosialisasi Pendidikan Politik Masyarakat


Honor PNS
-Ketua Org/Aktv 500,000
- Sekretaris Org/Aktv 400,000
- Anggota Org/Aktv 350,000
- Peserta Org/Aktv 150,000
Honor Non PNS
- Narasumber Org/Aktv 500,000
- Peserta Org/Aktv 150,000
- Moderator Org/Aktv 400,000

152 Perbaikan Proses Politik yang beretika Bagi Aparatur dan


Masyarakat dalam Rangka
Perekat Keanekaragaman Kultur Budaya
Honor PNS
- Ketua Org/Aktv 450,000
- Sekretaris Org/Aktv 400,000
- Anggota Org/Aktv 350,000
Honor Non PNS
- Operator/Entri data Org/Aktv 350,000
kegiatan fasilitasi ORKESMAS pembinaan organisasi
153 kemasyarakatan guna menumbuhkan wawasan
kebangsaan
HONOR TIM FASILITASI ORKESMAS PNS
- ketua org/akt 1,500,000
- sekretaris org/akt 1,300,000
- anggota org/akt 600,000
- peserta org/akt 100,000
HONOR TIM FASILITASI ORKESMAS non PNS
- peserta org/akt 100,000
- moderator org/akt 400,000
Belanja Jasa Tenaga Ahli/Instruktur/Narasumber org/akt 500,000

154 Honorarium Tim Penyelesaian Pencatatan Akta - Akta


Pencatatan Sipil
Honor PNS
- Ketua Tim Org/Bln 500,000
- Kordinator,Korektor danVerivikator Ulang Org/Bln 400,000
- Korektor Dan Verifikator Org/Bln 300,000
- Petugas Verifikasi dan Pendaftaran Org/Bln 200,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 671
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Petugas Pengeluaran Org/Bln 200,000
Honor Non PNS
- Petugas Pencatat dan Penata Dokumen Org/Bln 200,000

155 Honorarium Panitia Pelaksana Kegiatan Sinergitas


Kecamatan
- Ketua Org/Keg 850,000
- Sekretaris Org/Keg 600,000
- Anggota Org/Keg 400,000
- Pembantu Pelaksana Org/Keg 250,000
Honorarium Tim Rencana Aksi Pencegahan Dan
156
Pemberantasan Korupsi
- Ketua Org/Atv 1,000,000
-Pelaksana Harian Org/Atv 800,000
- Sekretaris Org/Atv 650,000
- Anggota Org/Atv 500,000
A. Honorarium Panitia Pelaksana Kegiatan Tim Koordinas
157
Penanggulangan Kemiskinan Daerah (TKPK) : (Bappeda)
- Penanggung Jawab Aktivitas 1,500,000
- Ketua Aktivitas 1,250,000
- Wakil Ketua Aktivitas 1,000,000
- Sekretaris Aktivitas 800,000
- Wakil Sekretaris Aktivitas 600,000
Sekretariat :
- Kepala Aktivitas 400,000
- Wakil Ketua Aktivitas 350,000
- Anggota Aktivitas 300,000
HONORARIUM NON PNS KEGIATAN BAGIAN HUMAS
158
DAN PROTOKOL
Honorarium Editor Org/bln 2,000,000
Hoborarium Layoter Org/bln 2,500,000
Honorarium Pengelola media sosial Org/bln 1,500,000
Honorarium Desain Grafis Org/bln 2,000,000
Honorarium Panitia Pelaksana Kegiatan Pelatihan Petugas
159
Entry Data Akta Online :
Ketua Org/Aktv 400,000
Sekretaris Org/Aktv 300,000
Anggota Org/Aktv 300,000
Honor Pelatih/Pengajar Org/Aktv 300,000
160 Uang Saku Peserta Pelatihan Org/Aktv 75,000
Pengembangan Sentral Data Kependudukan :
Petugas Entry Data KK Org/lbr 300
Petugas Coklit Data KK Org/lbr 600
(Kantor Perpustakaan) A. Honorarium Panitia Pelatihan
161 Tenaga Pengelola Perpustakaan Berbasis Masyarakat :

1. Ketua org/aktv 500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 672
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
2. Wakil Ketua org/aktv 400,000
3. Sekretaris org/aktv 300,000
4. Anggota org/aktv 200,000

Hadiah Lomba Mencari Karya Lokal Melalui Android :


1. Tingkat SD :
- Juara I 1,500,000
- Juara II 1,250,000
- Juara III 1,000,000
2. Tingkat SMP :
- Juara I 1,500,000
- Juara II 1,250,000
- Juara III 1,000,000
3. Tingkat SMA :
- Juara I 1,500,000
- Juara II 1,250,000
- Juara III 1,000,000
Honorarium Panitia Pelaksana Kegiatan Perpustakaan
161
Keliling
- Honor Petugas Keliling Kecamatan / Bln 500,000
- Honor Petugas Keliling Perpustakaan / Keg. 30,000
(Bagian Organisasi) A. Honorarium Tim Reformasi
162 Birokrasi Pemerintah Kabupaten Banyuwangi Tim
Pengarah Reformasi Birokrasi :
* Non PNS :
- Ketua org/aktv 1,000,000
- Wakil Ketua org/aktv 750,000
* PNS :
- Sekretaris org/aktv 750,000
- Anggota org/aktv 400,000

- Tim Pelaksana Reformasi Birokrasi :


* PNS :
- Ketua org/aktv 750,000
- Sekretaris org/aktv 600,000
- Wakil Sekretaris org/aktv 500,000
- Anggota org/aktv 400,000

B. Honorarium Tim Monitoring dan Evaluasi Kinerja SKPD :


* PNS :
- Ketua org/bln 1,500,000
- Wakil Ketua org/bln 1,250,000
- Sekretaris org/bln 1,000,000
- Anggota org/bln 500,000

C. Honorarium Instruktur / Nara Sumber Lakip


Pemerintah Kabupaten Banyuwangi :

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 673
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Instruktur / Nara Sumber Lakip org/jam 522,800
163 HONOR FORPIMKA :
HONOR PNS :
- Camat Org/Bln 500,000
* SEKRETARIAT KECAMATAN :
- Ketua Org/Bln 400,000
- Sekretaris Org/Bln 350,000
- Anggota Org/Bln 300,000
HONOR Non PNS :
- Danramil Org/Bln 500,000
- Kapolsek Org/Bln 500,000

164 Tim Intensifikasi Pajak Bumi dan Bangunan (PBB) :


- Penanggung Jawab Org/Bln 3,750,000
- Ketua Org/Bln 2,500,000
- Wakil ketua Org/Bln 2,000,000
- Wakil ketua II Org/Bln 1,850,000
- Sekretaris Org/Bln 1,600,000
- Sekretaris II Org/Bln 1,562,000
- Anggota (Koordinator) Org/Bln 1,000,000
- Anggota (Koordinator II) Org/Bln 950,000
- Anggota (Staf) Org/Bln 700,000
165 Honorarium Non PNS
Honorarium Petugas jaga PUSDALOPS Org/Bln 750,000
Honorarium Narasumber/Pengajar/Instruktur Luar
166 Kabupaten Dalam Provinsi Org/jam 750,000

167 Honorarium Pemandu Lapangan Org/jam 150,000


Honor/uang saku peserta pelatihan/ sosialisasi/ bimbingan
168 Org/aktivitas 75,000
teknis/ rapat
Honorarium Narasumber/ Pengajar/ Instruktur Dalam
169 Org/jam 500,000
Kabupaten
170 Honorarium Moderator Org/aktivitas 300,000
Honorarium Pelaksanaan Kegiatan Monitoring,
171 Evaluasi dan Pelaporan Program Pembangunan
Infrastruktur Perdesaan :
* Honorarium Tim Pelaksana :
- Penanggung Jawab Kegiatan Org/bln 1,000,000
- Kepala Satker Org/bln 750,000
- PPK Org/bln 650,000
- Bendahara Org/bln 500,000
- Pelaksana Kegiatan Org/bln 450,000
172 Honorarium Pelaksanaan Kegiatan DAK-SLBM :
- Honorarium TFL (Tenaga Fasilitator Lapangan) Org/bln 1,500,000
Kegiatan Biaya Operasioanal Program Jalin Matra
173
Feminisasi Kemiskinan dan BRTSM
Honorarium Panitia Pelaksana Kegiatan :
- Ketua Org/akt 375,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 674
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Sekretaris Org/akt 290,000
- Anggota Org/akt 200,000
Kegiatan Pembina Ekonomi Masyarakat
Honorarium Panitia Pelaksana Kegiatan :
- Ketua Org/akt 500,000
- Wakil Ketua Org/akt 400,000
- Sekretaris Org/akt 300,000
- Anggota Org/akt 200,000
Kegiatan Peningkatan Pemberdayaan PKK sub kegiatan
lomba desa kader PKK
Pemenang untuk Kegiatan Jambore Kader PKK
Juara 1 /even 600,000
Juara 2 /even 300,000
Juara 3 /even 200,000
Kegiatan Klasifikasi UP2K PKK
1. Dana Pembina untuk kelompok UP2K Kelompok 1,000,000
2. Dana Pembina Kader orang/kader 500,000
174 Honor Operator Klinik UMKM Org/bln 750,000
175 Honor Pegawai Outlet Org/bln 750,000
Pelatihan Ketrampilan bagi Penyandang Masalah
176
Kesejahteraan Sosial :
* Honor Panitia Pelaksana Kegiatan :
- Ketua ( 3 x org. keg. ) x Rp. 500.000,- Org/Keg. 1,500,000
- Sekretaris ( 3 x org. keg. ) x Rp. 300.000,- Org/Keg. 900,000
- Anggota ( 3 x org. keg ) x Rp. 250.000,- Org/Keg. 750,000
- Pendamping Org/Akv 700,000
Peningkatan Kemampuan (Capacity Building) Petugas
dan Pendamping Sosial Pemberdayaan Fakir Miskin,
177
KAT dan PMKS Lainya. Sub Kegiatan Fasilitas
Manajemen PMKS dalam penanggulangan PSKS
- Petugas Pendataan Org/akt 400,000
Peningkatan Kualitas SDM Kesejahteraan Sosial Sub.
Kegiatan Fasilitasi Kesejahteraan Sosial Bagi TKSK
178
dan Potensi Sumber Kesejahteraan Sosial (TKSK)
Lainnya
- Honor Anggota TKSK Org/Bln 250,000
Penanganan Masalah - Masalah Strategis yang
Menyangkut Tanggap Cepat Darurat dan Kejadian Luar
179 Biasa Sub. Kegiatan Pemulangan Orang Terlantar
(Kehabisan Bekal, Kehilangan dan Kecopetan) sampai
ke tempat tujuan
- Uang Saku / Transport yang diberikan kepada pihak
180 / Org 350,000
ketiga
181 Kegiatan Pemilihan dan Pemberdayaan Jebeng Thulik:
A. Honor Kepanitiaan :
1. Ketua / Org 500,000
2. Wakil Ketua / Org 400,000
3. Sekretaris / Org 300,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 675
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
4. Bendahara / Org 300,000
5. Anggota / Org 200,000
B. Pemenang Lomba :
1. Juara I / Org 5,000,000
2. Juara II / Org 4,000,000
3. Juara III / Org 3,000,000
4. Juara Harapan I / Org 2,000,000
5. Juara Harapan II / Org 1,500,000
6. Pavorit / Org 1,000,000
Honorarium Panitia Pelaksana Kegiatan Bimtek
182
Perencanaan :
- Penanggung Jawab Org / Hr 350,000
- Ketua Org / Hr 300,000
- Wakil Ketua Org / Hr 250,000
- Sekretaris Org / Hr 225,000
- Koordinator Org / Hr 200,000
- Anggota Org / Hr 150,000
183 Honorarium Panitia Pelaksana Kegiatan :
- Penanggung Jawab Org / Hr 350,000
- Ketua Org / Hr 300,000
- Wakil Ketua Org / Hr 250,000
- Sekretaris Org / Hr 225,000
- Koordinator Org / Hr 200,000
- Anggota Org / Hr 150,000
- Petugas administrasi/entry dan ( non PNS) Org/Hari 125,000
184 * Honorarium Panitia Pelaksana Seleksi CPNS
- Ketua Org/Keg. 4,000,000
- Sekretaris Org/Keg. 3,000,000
- Anggota Org/Keg. 1,000,000
Honorarium Panitia Ujian Dinas dan Penyesuaian
185
Ijazah:
- Ketua Org/Keg. 2,000,000
- Sekretaris Org/Keg. 1,500,000
- Anggota Org/Keg. 500,000
Honorarium Tim Koordinasi Penyusunan Instrumen
186
pemberian Tambahan Penghasilan PNS
PNS :
- Penanggung Jawab org/akt 1,500,000
- Program Manager org/akt 1,250,000
- Team Leader org/akt 1,000,000
- Sistem Analis org/akt 800,000
- Programer org/akt 650,000
- Web Design org/akt 500,000
- Net Working org/akt 450,000
187 Honorarium Tim Penilai Pelayanan Publik
PNS :

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 676
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Ketua org/akt 750,000
- Sekretaris org/akt 600,000
- Wakil Sekretaris org/akt 500,000
- Anggota org/akt 400,000
Honorarium Instruktur / Nara Sumber Standar
189
Kompetensi Jabatan (SKJ)
- Instruktur / Nara Sumber Standar Kompetensi Jabatan
org/jam 500,000
(SKJ)
190 Honorarium Penyelenggraan MTQ
Honor Non PNS
* Panitia Pelaksana Kegiatan
- Tenaga IT OH 200,000
- Tenaga Administrasi Pengolah Data OH 150,000
- Tenaga MC OH 150,000
* Panitia Seksi Keamanan *
- Pendaftaran Ulang Khalifah MTQ OH 50,000
- Pawai Ta'aruf OH 50,000
- Pembukaan Pameran Produk Unggulan OH 50,000
- Pelaksanaan Pameran Produk Unggulan OH 50,000
- Pembukaan dan Penutupan OH 50,000
- Pelaksanaan Loma - Lomba OH 50,000
* Panitia Seksi Kebersihan *
- Pendaftaran Khalifah MTQ OH 25,000
- Pawai Ta'aruf OH 25,000
- Pembukaan Pameran Produk Unggulan OH 25,000
- Pelaksanaan Pameran Produk Unggulan OH 25,000
- Pembukaan dan Penutupan OH 25,000
- Pelaksanaan Loma - Lomba OH 25,000
191 Honorarium Penanggungjawab Pengelola Keuangan Khusus RSUD /
1. Pejabat Pengguna Anggaran (PA) :
a. Nilai pagu dana s.d Rp. 100 Juta org/bulan 360,000
b. Nilai pagu dana diatas Rp. 100 juta s.d. 250 juta org/bulan 430,000
c. Nilai pagu diatas Rp. 250 juta s.d. 500 juta org/bulan 500,000
d. Nilai pagu dana diatas Rp. 500 juta s.d. 1 miliar org/bulan 575,000
e. Nilai pagu dana diatas 1 miliar s.d. 2 ,5 miliar org/bulan 720,000
f. Nilai pagu dana diatas Rp. 2,5 miliar s.d. 5 miliar org/bulan 790,000
g. Nilai pagu dana diatas Rp. 5 miliar s.d. 10 miliar org/bulan 860,000
h. Nilai pagu dan diatas Rp.10 miliar s.d. 25 miliar org/bulan 1,080,000
i. Nilai pagu dana diatas Rp.25 miliar s.d. 50 miliar org/bulan 1,150,000
j. Nilai pagu dana diatas Rp.50 miliar org/bulan 1,250,000
Pejabat Kuasa Pengguna Anggaran (KPA) Pejabat /
192 Pejabat Pembuat Komitmen (PPK)/Pejabat Khusus RSUD /
Penatausahaan Keuangan :
a. Nilai pagu dana s.d Rp. 100 Juta org/bulan 300,000
b. Nilai pagu dana diatas Rp. 100 juta s.d. 250 juta org/bulan 360,000
c. Nilai pagu diatas Rp. 250 juta s.d. 500 juta org/bulan 420,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 677
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
d. Nilai pagu dana diatas Rp. 500 juta s.d. 1 miliar org/bulan 500,000
e. Nilai pagu dana diatas Rp. 1 miliar s.d. 2,5 miliar org/bulan 600,000
f. Nilai pagu dana diatas Rp. 2,5 miliar s.d. 5 miliar org/bulan 650,000
g. Nilai pagu dana diatas Rp. 5 miliar s.d. 10 miliar org/bulan 725,000
h. Nilai pagu dana diatas Rp. 10 miliar s.d. 25 miliar org/bulan 900,000
i. Nilai pagu dana diatas Rp. 25 miliar s.d. 50 miliar org/bulan 1,000,000
j. Nilai pagu dana diatas Rp. 50 miliar org/bulan 1,100,000
193 Pejabat Pelaksana Teknis Kegiatan (PPTK)
a. Nilai pagu dana s.d. Rp. 100 juta org/bulan 300,000
b. Nilai pagu dana diatas Rp. 100 juta s.d. 250 juta org/bulan 350,000
c. Nilai pagu dana diatas Rp. 250 juta s.d. 500 juta org/bulan 400,000
d. Nilai pagu dana diatas rp. 500 juta s.d. 1 miliar org/bulan 480,000
e. Nilai pagu dana diatas Rp. 1 miliar s.d. 2,5 miliar org/bulan 550,000
f. Nilai pagu dana diatas Rp. 2,5 miliar s.d. 5 miliar org/bulan 600,000
g. Nilai pagu dana diatas Rp. 5 miliar s.d. 10 miliar org/bulan 700,000
h. Nilai pagu dana diatas Rp. 10 miliar s.d. 25 miliar org/bulan 800,000
i. Nilai pagu dana diatas Rp. 25 miliar s.d. 50 miliar org/bulan 950,000
j. Nilai pagu dana diatas Rp. 50 miliar org/bulan 1,100,000

Bendahara Pengeluaran/Bendahara Pengeluaran


194 Pembantu/Bendahara Penerimaan/Bendahara
Penerimaan Pembantu

a. Nilai pagu dana s.d. Rp. 100 juta org/bulan 250,000


b. Nilai pagu dana diatas Rp. 100 juta s.d. 250 juta org/bulan 300,000
c. Nilai pagu dana diatas Rp. 250 juta s.d. 500 juta org/bulan 350,000
d. Nilai pagu dana diatas rp. 500 juta s.d. 1 miliar org/bulan 400,000
e. Nilai pagu dana diatas Rp. 1 miliar s.d. 2,5 miliar org/bulan 500,000
f. Nilai pagu dana diatas Rp. 2,5 miliar s.d. 5 miliar org/bulan 540,000
g. Nilai pagu dana diatas Rp. 5 miliar s.d. 10 miliar org/bulan 590,000
h. Nilai pagu dana diatas Rp. 10 miliar s.d. 25 miliar org/bulan 750,000
i. Nilai pagu dana diatas Rp. 25 miliar s.d. 50 miliar org/bulan 800,000
j. Nilai pagu dana diatas Rp. 50 miliar s.d. 75 miliar org/bulan 850,000
Honorarium Pejabat Pengadaan, Panitia
195
Pemeriksa/Penerima Barang/Jasa
Pejabat Pengadaan Barang/Jasa org/bulan 250,000
Panitia Pemeriksa/Penerima ( Pengurus/Penyimpan )
196
Barang/ Jasa
a.Ketua org/bulan 250,000
b. Sekretaris org/bulan 200,000
c. Anggota org/bulan 200,000
197 Honorarium Staf Pengelola
a. Nilai pagu dana s.d. Rp. 100 juta org/bulan 100,000
b. Nilai pagu dana diatas Rp. 100 juta s.d. 250 juta org/bulan 200,000
c. Nilai pagu dana diatas Rp. 250 juta s.d. 500 juta org/bulan 250,000
d. Nilai pagu dana diatas rp. 500 juta s.d. 1 miliar org/bulan 275,000
e. Nilai pagu dana diatas Rp. 1 miliar s.d. 2,5 miliar org/bulan 350,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 678
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
f. Nilai pagu dana diatas Rp. 2,5 miliar s.d. 5 miliar org/bulan 375,000
g. Nilai pagu dana diatas Rp. 5 miliar s.d. 10 miliar org/bulan 400,000
h. Nilai pagu dana diatas Rp. 10 miliar s.d. 25 miliar org/bulan 500,000
i. Nilai pagu dana diatas Rp. 25 miliar s.d. 50 miliar org/bulan 550,000
j.Nilai pagu dana diatas Rp.50 miliar org/bulan 600,000
Kegiatan Penyuluhan Pencegahan peredaran,
198
Penggunaan Minuman keras dan Narkoba :
- Moderator org/Keg. 350,000
- Narasumber Org/Jam 500,000
Honorarium Kegiatan Waer Resources and Irigation
199
Management Program (WISMP):
* Honor PNS * :
- Ketua Org/Atv 125,000
- Sekretaris Org/Atv 100,000
- Anggota Org/Atv 75,000
- Honorarium Tenaga Pendampingan (Tenaga Ahli) Org/bulan 1,500,000
* Kegiatan Pelatihan Paralegal :
- Uang Harian Pelatihan Pelatihan org/hr 75,000
- Honorarium Moderator org/hr 200,000
- Honorarium Jasa Pembantu Pelaksana Kegiatan org/hr 50,000
- Honorarium Tenaga Ahli / Nara Sumber org/45 mnt 500,000
- Honorarium Nara Sumber Dalam Daerah org/45 mnt 300,000
* Kegiatan Peningkatan Wanita Menuju Keluarga Sehat
200
Sejahtera (P2WKSS) :
- Honorarium Tim Pembina org/keg. 200,000
* Kegiatan Pemberdayaan Perempuan Pengembang
201
Ekonomi Lokal (P3EL) :
- Honorarium Tim Pembina org/keg. 200,000
* Honorarium Pembantu Pembina Keluarga Berencana
Desa (PPKBD) Org/Bln 150,000

- PPKBD Org/Bln 100,000


- NON PPKBD
201.1 Pelatihan Pengelolaan Web Desa Program Smart Kampung
Honorarium Non PNS
- Honorarium peserta org/akt 100,000
201.2 Pelatihan Bagi Tim Pengelola Kegiatan (TPK) Desa
Honorarium Non PNS
- Honorarium peserta org/akt 100,000
201.3 Penyelenggaraan Lomba Smart Kampung
a. Honorarium PNS :
Honorarium Panitia Pelaksana Kegiatan
- Ketua org/akt 500,000
- Wakil Ketua org/akt 500,000
- Sekretaris org/akt 400,000
- Anggota org/akt 250,000
Honorarium Tim Penilai/Juri

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 679
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Juri Lomba Smart Kampung org/akt 250,000
b. Honorarium Non PNS
Honorarium Panitia Pelaksana Kegiatan
- Anggota panitia pelaksana kegiatan org/akt 250,000
Hadia lomba (Uang Yang Akan Diserahkan Kepada Pihak
201.4 Ke - 3) Kegiatan Peningkatan Kinerja Masyarakat Dalam
Membangun Desa/Kelurahan
- Juara I /Desa 35,000,000
- Juara II /Desa 30,000,000
- Juara III /Desa 20,000,000
* Kegiatan Focal Point (orang yang ditunjuk untuk
202
memfasilitasi Program PUG :
- Uang Harian Pelatihan Pelatihan org/hr 75,000
- Honorarium Moderator org/hr 200,000
- Honorarium Jasa Pembantu Pelaksana Kegiatan org/hr 50,000
- Honorarium Tenaga Ahli / Nara Sumber org/45 mnt 500,000
- Honorarium Nara Sumber Dalam Daerah org/45 mnt 300,000
203 Kegiatan Monitoring dan Evaluasi Jasmas
- Honorarium Tim Monev Jasmas org/keg 150,000
204 * Kegiatan Work Shop UU Nomor 21 Tahun 2007
- Uang Harian Pelatihan Pelatihan org/hr 75,000
- Honorarium Moderator org/hr 200,000
- Honorarium Jasa Pembantu Pelaksana Kegiatan org/hr 50,000
- Honorarium Tenaga Ahli / Nara Sumber org/45 mnt 500,000
- Honorarium Nara Sumber Dalam Daerah org/45 mnt 300,000
205 * Kegiatan Forum Anak :
- Uang Harian Peserta org/hr 50,000
- Honorarium Moderator org/hr 200,000
- Honorarium Jasa Pembantu Pelaksana Kegiatan org/hr 50,000
- Honorarium Nara Sumber Dalam Daerah org/45 mnt 300,000
206 * KIE KKG (Kesetaraan dan Keadilan Gender)
- Uang Harian Peserta Rapat Koordinasi org/hr 50,000
- Uang Harian Peserta Pelatihan org/hr 75,000
- Honorarium Moderator org/hr 200,000
- Honorarium Jasa Pembantu Pelaksana Kegiatan org/hr 50,000
- Honor Tenaga Ahli / Nara Sumber org/45 mnt 500,000
- Honorarium Nara Sumber Dalam Daerah org/45 mnt 300,000
*Kegiatan Penilaian Kebutuhan Pasca Bencana Banjir
207
dan Abrasi Pantai *
Honorarium PNS
- Penanggung Jawab Tim Pelaksana Kegiatan org/akt 500,000
- Koordinator Tim Pelaksana Kegiatan org/akt 400,000
- Sekretaris Tim Pelaksana Kegiatan org/akt 350,000
- Anggota Tetap Pelaksana Kegiatan org/akt 300,000
- Anggota Tetap Pelaksana Kegiatan dan Administrasi org/akt 200,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 680
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Anggota Tidak Tetap Pelaksana Kegiatan org/akt 200,000
Honorarium PNS/Non PNS
- Anggota Tetap Pelaksana Kegiatan dan Administrasi org/akt 150,000
* Kegiatan Penyusunan Rencana Mitigasi
208
Penanggulangan Bencana
Honorarium PNS
- Penanggung Jawab org/bulan 500,000
- Koordinator org/bulan 400,000
Honorarium PNS/Non PNS
- Peserta org/hr 100,000
- Anggota org/bulan 300,000
- Pembekalan Materi org/JP 500,000
* Kegiatan Pelatihan SAR dan Sosialisasi
209
Penanggulangan Bencana Alam
Honorarium PNS/Non PNS
- Peserta org/hr 100,000
- Instruktur/Narasumber org/JP 500,000
* Kegiatan Monitoring Deteksi Dini Penanggulangan
210
Bencana
Honorarium PNS
- Penanggung Jawab Kegiatan org/akt 750,000
- Ketua Pelaksana Kegiatan org/akt 500,000
- Sekretaris Pelaksana Kegiatan org/akt 400,000
- Koordinator Pengelolah Data org/akt 300,000
- Tenaga Pengelolah Data Kabupaten org/akt 200,000
- Pengelolah Data Kecamatan org/akt 200,000
Honorarium Non PNS
- Pengelolah Data org/akt 200,000
* Kegiatan Pengetahuan dan Penyebarluasan Informasi
211 Potensi Benca Alam Sub Kegiatan Fasilitasi Tim
Reaksi Cepat Penanggulangan Bencana
Honorarium PNS
- Penanggung Jawab Kegiatan org/akt 1,000,000
- Ketua Pelaksana Kegiatan org/akt 750,000
- Koordinator Pelaksana org/akt 550,000
- Koordinator Pelaksana Harian org/akt 350,000
- Anggota Pelaksana Harian org/akt 150,000
- Petugas Piket Posko org/akt 50,000
Honorarium Non PNS
- Anggota Pelaksana Harian org/akt 100,000
- Anggota org/akt 100,000
Kegiatan Pengadaan Tempat Penampungan Sementara
212 dan Evakuasi Penduduk dan Ancaman/Korban
Bencana Alam Sub. Kegiatan Operasional PUSDALOP :
Honorarium PNS
- Penanggung Jawab Kegiatan org/akt 1,000,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 681
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Ketua Pelaksana Kegiatan org/akt 800,000
- Koordinator Pelaksana Kegiatan org/akt 600,000
- Anggota Pelaksana Harian org/akt 400,000
- Anggota org/akt 150,000
Honorarium Non PNS
- Anggota org/akt 150,000
- Petugas Jaga PUSDALOPS org/1x jaga 50,000
Kegiatan Peran Serta Masyarakat Dalam perlindungan
213
dan Konservasi SDA (Desa Berseri)
- Honor Penilai org/akt 250,000
- Pengemudi org/akt 100,000
- Uang Pembinaan Desa Berseri / Desa 5,000,000
- Honor Peserta (Non PNS) org/akt 150,000
- Kaos Kader Lingkungan Buah 100,000
- Uang pembinaan persiapan desa berseri Provinsi / Desa 7,500,000
Peningkatan Edukasi dan Komunikasi Masyarakat di
214
Bidang Lingkungan
- Nara Sumber Bintek ADIWIYATA / 45 menit 1,500,000
- Nara Sumber Hari Lingkungan Hidup / 45 menit 500,000
- Tim Penilai dan Pembina ADIWIYATA Org/Akt 250,000
Peningkatan Peran Serta Masyarakat Dalam
215
Pengelolaan Persampahan
- Honor Nara Sumber / 45 menit 500,000
kegiatan Pelatihan dan Sosialisasi Kegiatan
216
Lingkungan Hidup
- Honor Peserta Org / Akt 100,000
Honorarium Kegiatan Sertifikasi Hak Tanah
217
Pembudidaya :
I. POKJA SEHAT Pembudidaya Ikan :
- Pengarah Org/Keg. 2,000,000
- Ketua Org/Keg. 1,500,000
- Wakil Ketua Org/Keg. 1,150,000
- Sekretaris Org/Keg. 900,000
- Anggota Org/Keg. 750,000
II. Sekretariat POKJA SEHAT Pembudidaya Ikan :
- Ketua Org/Keg. 1,000,000
- Sekretaris Org/Keg. 800,000
- Anggota Org/Keg. 600,000
III. Petugas Pelaksana / Petugas Lapangan :
- Camat Org/Keg. 1,000,000
- Kades / Sekdes Org/Keg. 800,000
- Pembantu Petugas Lapangan Org/Keg. 800,000
218 Hadiah Kegiatan GEMAR IKAN :
* Lomba Masak Ikan
- Juara I unit 2,000,000
- Juara II unit 1,000,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 682
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Juara III unit 750,000

* Lomba Gemar Ikan


- Juara I unit 500,000
- Juara II unit 400,000
- Juara III unit 300,000

* Lomba Kantin Sekolah Gemar Ikan :


- Juara I unit 500,000
- Juara II unit 400,000
- Juara III unit 300,000
219 Honor/Jasa Perawatan dan Pemakaman Jenazah Org/Akt 750,000
220 Honor / Jasa Cleaning Service M2/bln 6,900
Tim Monitoring dan Evaluasi Pengembangan Daerah
221
Tujuan Wisata :
- Penasehat Org/bln 1,250,000
- Pembina Org/bln 1,150,000
- Ketua Org/bln 1,000,000
- Wakil Ketua Org/bln 900,000
- Sekretaris Org/bln 750,000
- Anggota Org/bln 500,000
222 Kegiatan Kepariwisataan
Honor Jasa Tenaga Ahli/Instruktur/Narasumber
Org/45 menit 300,000
Kepariwisataan
223 Honor Petugas Dokumen Pemberitaan Org/bln 750,000
Kegiatan Pemantauan, Pelaporan dan Evaluasi
224 Perkembangan Politik Daerah

* Honor Tim Pemantauan PNS:


- Pengarah Org / Akt 4,000,000
- Pembina Org / Akt 3,500,000
- Ketua Org / Akt 2,500,000
- Sekretaris 1 Org / Akt 2,000,000
- Sekretaris 2 Org / Akt 2,000,000
- Koordinator Org / Akt 750,000
- Anggota Org / Akt 500,000
- Tenaga Lapangan Org / Akt 300,000
- Operator Kabupaten dan Kecamatan Org / Akt 200,000
- Tenaga Administrasi Pelaporan Sekretaris Org / Akt 320,000
- Peserta Org / Akt 100,000
* Honor Tim Pemantauan Non PNS:
- Pengarah Org / Akt 4,000,000
- Peserta Org / Akt 100,000
- Moderator Org / Akt 800,000
* Belanja Jasa Tenaga Ahli / Instruktur / Narasumber Org / Jam 500,000
Kegiatan Dukungan Penyelenggaraan Pemilihan Kepala
225
Daerah dan Wakil Kepala Daerah

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 683
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
* Honor Tim fasilitasi Dukungan Penyelenggaraan Pemilu
226
PNS :
- Ketua Org / Akt 1,000,000
- Sekretaris Org / Akt 800,000
- Anggota Org / Akt 500,000
- Peserta Org / Akt 100,000

* Honor Non PNS :


- Peserta Org / Akt 100,000
- Moderator Org / Akt 400,000

* Belanja Jasa Tenaga Ahli / Instruktur / Narasumber Org / Jam 500,000

Kegiatan Pendataan Profil Desa/Kelurahan sesuai data


227
dasar keluarga
Honorarium PNS
1. Penanggung Jawab/Kepala Badan Tahun 1,500,000
2. Ketua/Kabid Pemerintahan Desa Tahun 1,250,000
3. Sekretaris/Kasubid Pemerintahan Desa Tahun 1,000,000
4. Anggota Tahun 750,000

Honorarium Non PNS


Honorarium POKJA Profil Desa Tingkat Desa/Kelurahan
1. Penanggung Jawab/Lurah Tahun 600,000
2. Ketua/Sekretaris Lurah Tahun 500,000
3. Anggota Tahun 400,000
4. Entry Data Dasar Keluarga /KK 3,000
5. Pendataan Data Dasar Keluarga /KK 7,000
228 Honor Petugas Pendata Obyek Pajak OP 5,000
229 Honor Petugas Pendamping Pendata Obyek Pajak OP 2,000
Honorarium Panitia Pelaksanaan Kegiatan Tim Validasi
230
Data Piutang PBB-P2 Tahun Anggaran 2015 :
- Penanggung Jawab Org/Keg 4,000,000
- Ketua Org/Keg 3,500,000
- Wakil Ketua Org/Keg 3,500,000
- Sekretaris Org/Keg 3,250,000
- Wakil Sekretaris Org/Keg 3,000,000
- Koordinator Org/Keg 2,150,000
- Validator Org/Keg 1,950,000
- Anggota Validasi/Verifikasi Org/Keg 1,700,000
- Anggota Pelaksana Validasi desa / Kelurahan Org/Keg 400,000
Honorarium Tim Pendistribusian SPPT PBB Keg.
Intensifikasi dan Ekstensifikasi Sumber -sumber
230.1 Pendapatan Daerah untuk Sub keg. Validasi Data Piutang
PBB-P2:
- Penanggung Jawab Orng/Keg 5,000,000
- Ketua Orng/Keg 4,000,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 684
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Wakil Ketua Orng/Keg 3,000,000
- Sekretaris Orng/Keg 2,500,000
- Wakil Sekretaris Orng/Keg 2,000,000
- Koordinator Kecamatan Orng/Keg 1,500,000
- Anggota Orng/Keg 1,000,000
- Petugas Pendistribusi Desa/Kel Per Lembar SPPT 500
Kegiatan Koordinasi Penyusunan Laporan Kinerja
231
Pemerintah Daerah
a.Honorarium Tim Sakip Kabupaten
PNS
- Penanggung Jawab OB 2,500,000
- Ketua OB 2,250,000
- Koordinator Bidang OB 2,000,000
- Anggota OB 1,000,000
b. Honorarium Tim Penyusun Laporan Kinerja Pemkab
PNS
- Tim Penyusun Laporan Kinerja Pemkab Org/bln 750,000
232 Kegiatan Pelaksanaan Reformasi Birokrasi :
Honorarium Organisasi Masyarakat (Tim Pemberi
Masukan dan Membantu Menyebarluaskan Informasi
Pelaksanaan Reformasi Birokrasi
NON PNS :
- Koordinator Org/Akt 300,000
- Anggota Org/Akt 250,000
Kegiatan Honor Tim Evaluasi Kinerja Penyelenggaraan
233
Pemerintah Daerah (EKPPD)
- Honorarium Narasumber EKPPD Pusat OJ 1,000,000
- Honorarium Tim EKPPD Provinsi OJ 300,000
- Honorarium Tim EKPPD Kabupaten terdiri :
1. Pengarah OB 500,000
2. Ketua OB 400,000
3. Sekretaris OB 300,000
4. Anggota OB 300,000
234 Peningkatan Kesadaran Bela Negara
- Honor Peserta Org/Akt 100,000
- Honor Moderator Org/Akt 400,000
- Honor Narasumber Org/Jam 500,000
- Honor Peserta Non PNS Org/Akt 200,000
235 Forum Pembauran Kebangsaan
- Honor Peserta Non PNS Org/Akt 200,000
- Honor Peserta Org/Akt 200,000
- Honor Moderator Org/Akt 400,000
- Honor Narasumber Org/Jam 500,000
Aktualisasi Seni Budaya Daerah Dalam Memperkuat Nilai-
235.1 nilai Luhur Budaya Bangsa

- Honor Peserta Non PNS Org/Akt 250,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 685
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Honor Moderator Org/Akt 400,000
- Honor Narasumber Org/Jam 500,000
Peningkatan Toleransi Dalam Kehidupan Beragama
235.2
(Fasilitasi Forum Lintas Agama)
- Honor Peserta Non PNS Org/Akt 300,000
- Honor Moderator Org/Akt 400,000
- Honor Narasumber Org/Jam 500,000
235.3 Honor Tim Pengendalian Stabilitas Daerah
- Ketua Org/Bln 5,000,000
- Kapolres Banyuwangi Org/Bln 4,000,000
- Dandim Banyuwangi Org/Bln 4,000,000
- Danlanal Banyuwangi Org/Bln 4,000,000
- Kajari Org/Bln 4,000,000
- Ketua Pengadilan Org/Bln 4,000,000
- Ketua DPRD Org/Bln 4,000,000
- Wakil Bupati Org/Bln 4,000,000
- Asisten Pemerintahan Org/Bln 2,500,000

236.4 Honorarium Tim Pengendalian Stabilitas Daerah


Kabupaten Banyuwangi
- Koordinator / Ketua /Bulan 8,000,000
- Sekretaris /Bulan 7,000,000
- Anggota /Bulan 7,000,000
- Pelaksana Harian /Bulan 2,500,000
236 Organisasi Kemahasiswaan
- Honor Peserta Org/Akt 100,000
- Honor Moderator Org/Akt 350,000
- Honor Narasumber Org/Jam 500,000
Honorarium Kegiatan Sarasehan Seniman dan
237
Budayawan
- Honor Peserta Org/Akt 200,000
- Honor Moderator Org/Akt 350,000
- Honor Narasumber Org/Jam 500,000
Honorarium Panitia Pelaksanaan Kegiatan Tim Validasi
238
Data Piutang PBB-P2 Tahun Anggaran 2015 :
- Penanggung Jawab Org/Keg 4,000,000
- Ketua Org/Keg 3,500,000
- Wakil Ketua Org/Keg 3,500,000
- Sekretaris Org/Keg 3,250,000
- Wakil Sekretaris Org/Keg 3,000,000
- Koordinator Org/Keg 2,150,000
- Validator Org/Keg 1,950,000
- Anggota Validasi/Verifikasi Org/Keg 1,700,000
- Anggota Pelaksana Validasi Desa / Kelurahan Org/Keg 400,000
Honorarium Tim SAKIP SKPD Kegiatan Koordinasi
239
Penyusunan Laporan Kinerja Pemerintah Daerah
- Ketua Org/akt 500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 686
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Sekretaris Org/akt 400,000
- Anggota Org/akt 300,000

Honorarium Pengembangan Hubungan Industrial yang


Harmonis, Dialogis, Adil dan Bermartabat serta Perbaikan
240 Upah, Syarat Kerja dan Kesejahteraan Pekerja / Buruh
Sub Keg. Pembinaan dan Pembentukan Sarana
Hubungan Industrial (PP,PKB,LKS,Bipartit dan Jamsostek

- Ketua Org/akt 800,000


- Wakil Ketua I Org/akt 700,000
- Wakil Ketua II Org/akt 650,000
- Sekretaris Org/akt 600,000
- Anggota Org/akt 500,000
- Sekretariat merangkap Anggota Org/akt 500,000
241 Fasilitasi Penyelesaian Perselisihan Partai Politik
- Honor PNS :
Tim Verifikasi dan Kelengkapan Persyaratan
1. Ketua Org/Akt 1,000,000
- Honor / Jasa dokter Spesialis gigi Org/Akt 10,000,000
2. Sekretaris Org/Akt 800,000
3. Anggota Org/Akt 500,000
- Honor Non PNS :
Tim Verifikasi dan Kelengkapan Persyaratan
1. Anggota Org/Akt 500,000
2. Peserta Org/Akt 150,000
3. Moderator Org/Akt 500,000
- Jasa Tenaga Ahli/Instruktur/Narasumber
1. Narasumber Org/Jam 500,000
Fasilitasi Pemberian Hibah pada Pemerintah/Instansi
242
Vertikal
- Honor PNS :
Tim Fasilitasi dan Kajian Hibah (Lintas SKPD) :
1. Ketua Org/Akt 1,000,000
2. Sekretaris Org/Akt 800,000
3. Anggota Org/Akt 500,000
Program Pendidikan Politik Masyarakat (Melaksanakan
243 Pendidikan Politik di Perguruan Tinggi di Kab.
Banyuwangi)
- Honor Non PNS :
1. Moderator Org/Akt 500,000
2. Peserta Org/Akt 150,000
Program Pendidikan Politik Masyarakat (Kabupaten
244
Banyuwangi Peduli HAM)
Tim Fasilitasi Kabupaten Banyuwangi Peduli HAM
- Honor PNS :
1. Ketua Org/Akt 1,500,000
2. Sekretaris Org/Akt 1,300,000
3. Anggota Org/Akt 600,000
- Honor Non PNS :

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 687
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
1. Anggota Org/Akt 600,000
2. Peserta Org/Akt 400,000
3. Moderator Org/Akt 200,000
Koordinasi Forum - Forum Diskusi Politik (Pemahaman
245 Pendidikan Politik)

- Honor Non PNS :


1. Peserta Org/Akt 200,000
2. Moderator Org/Akt 500,000
Program Pendidikan Politik Masyarakat (Pemberdayaan
246 dan Pendataan Orkesmas dan Tim Fasilitasi Orkesmas
PNS)
- Honor PNS
1. ketua Org/Akt 1,500,000
2. Sekretaris Org/Akt 1,300,000
3. Anggota Org/Akt 600,000
4. Peserta Org/Akt 200,000
- Honor Non PNS
1. Anggota Org/Akt 600,000
2. Peserta Org/Akt 200,000
3. Moderator Org/Akt 500,000
Penyuluhan Pencegahan Peredaran / Penggunaan
Miras/Narkoba (Pembinaan dan Pengawasan
247
Penyelenggaraan Fasilitasi Pencegahan dan
Penyalahgunaan Narkoba)
1. Honor Peserta Org/Akt 100,000
2. Moderator Org/Akt 350,000
3. Narasumber Org/Akt 500,000
Pembinaan Kesadaran Masyarakat akan ketertiban dan
248 keamanan (Peningkatan rasa Solidaritas dan Ikatan Sosial
Dikalangan Masyarakat)
- Honor PNS
1. Honor Peserta Org/Akt 250,000
- Honor Non PNS
1. Peserta Org/Akt 225,000
- Modirator Org/Akt 350,000
- Narasumber Org/Akt 500,000
Pembinaan Kesadaran Masyarakat akan Ketertiban dan
249 Keamanan (Forum Pimpinan Perguruan Tinggi)

1. Peserta (Rektor) Org/Akt 500,000


2. Peserta (Purek) Org/Akt 250,000
- Modirator Org/Akt 350,000
- Narasumber Org/Akt 500,000
Pembinaan Kesadaran Masyarakat akan Ketertiban dan
250 Keamanan (Sinergitas 3 Pilar Pembangunan Babinsa,
Babinkamtibmas, Lurah/Kades) :
1. Honor Panitia Pelaksana Kegiatan
- Anggota Pengarah Org/Akt 1,000,000
- Panitia Pengarah (Forpimda) Org/Akt 1,000,000
- Ketua Org/Akt 900,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 688
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Sekretaris Org/Akt 700,000
- Anggota Org/Akt 500,000
2. Peserta (Muspika) Org/Akt 250,000
3. Peserta Org/Akt 220,000
Peningkatan dan Pengembangan Sistem Deteksi Dini dan
251
Cegah Dini terhadap Konflik Masyarakat
1. Peserta Org/Akt 250,000
- Modirator Org/Akt 350,000
- Narasumber Org/Akt 500,000
Pengendalian keamanan lingkungan (komunitas intelijen
252
Daerah/KOMINDA)
- Ketua Orb/Bln 5,750,000
- Pelaksana Harian Orb/Bln 2,800,000
- Sekretaris Orb/Bln 2,700,000
- Koordinator Anggota Bidang Pemerintahan Orb/Bln 4,100,000
- Koordinator Anggota Bidang Kemasyarakatan Orb/Bln 4,500,000
- Anggota tetap PNS Orb/Bln 2,300,000
- Anggota tetap NON PNS Orb/Bln 2,000,000
- Anggota tidak tetap Orb/Bln 900,000
Tim Fasilitasi Pencegahan Pembrantasan
252.1 Penyalahgunaan Miras dan Napza (Narkoba dan Zat
Adiktif lainnya)
- Ketua Org/Akt 1,000,000
- Sekretaris Org/Akt 800,000
- Anggota Org/Akt 500,000
252.2 Pemantapan Ketahanan Dan Kebijakan Strategis Daerah
- Peserta Org/Akt 500,000
252.3 Fasilitasi Penanganan Konflik Sosial
- Peserta Org/Akt 300,000
253 Pengendalian Keamanan Lingkungan (FKDM) :
1. Honor Pelaksana Kegiatan :
- Ketua Org/Akt 700,000
- Sekretaris Org/Akt 500,000
- Anggota Org/Akt 300,000
- Peserta Org/Akt 250,000
- Modirator Org/Akt 350,000
- Narasumber Org/Akt 500,000
254 Honorarium Kompetensi Bidang Pertamanan
a. Honorarium Tenaga ahli/narasumber Org/45 menit 500,000
255 Honorarium Program Banyuwangi Berkebun
a. Honorarium Tenaga ahli/narasumber Org/45 menit 750,000
256 Honorarium Lomba dan Pameran Taman
a. Honorarium Tenaga ahli/narasumber Org/Aktv 1,000,000
b. Honorarium tim penilai juri dalam Kabupaten
Org/Aktv 500,000
Banyuwangi
c. Honorarium Panitia pelaksana kegiatan
- Ketua Org/Aktv 1,000,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 689
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Wakil Org/Aktv 800,000
- Sekretaris Org/Aktv 700,000
- Bendahara Org/Aktv 500,000
- Anggota Org/Aktv 350,000
d. Pemberian hadiah Lomba dan Pameran Taman
Honorarium Tim Pemanfaatan Tata Ruang
1. Ketua Orang/bln 750,000
2. Wakil ketua Orang/bln 700,000
3. Sekretaris Orang/bln 650,000
4. Anggota 1 Orang/bln 550,000
Anggota 2 Orang/bln 550,000
Anggota 3 Orang/bln 550,000
Anggota 4 Orang/bln 550,000
Honorarium Tim Pengendalian Ruang
1. Ketua Orang/bln 750,000
2. Wakil ketua Orang/bln 700,000
3. Sekretaris Orang/bln 650,000
4. Anggota 1 Orang/bln 550,000
Anggota 2 Orang/bln 550,000
Anggota 3 Orang/bln 550,000
Anggota 4 Orang/bln 550,000
Lomba Penataan Taman Lingkungan
- Juara I Orang/bln 7,500,000
- Juara II Orang/bln 6,000,000
- Juara III Orang/bln 5,000,000
- Harapan I Orang/bln 4,000,000
- Harapan II Orang/bln 3,500,000
- Harapan III Orang/bln 3,000,000
Lomba Penataan Taman
- Juara I Orang/bln 10,000,000
- Juara II Orang/bln 7,500,000
- Juara III Orang/bln 6,000,000
- Harapan I Orang/bln 4,000,000
- Harapan II Orang/bln 3,500,000
- Harapan III Orang/bln 3,000,000
257 Program merdeka dari sampah
Desa/Keluraha
- Juara I 5,000,000
n/Pokmas
Desa/Keluraha
- Juara II 4,000,000
n/Pokmas
Desa/Keluraha
- Juara III 3,000,000
n/Pokmas
Desa/Keluraha
- Harapan II 2,500,000
n/Pokmas
Desa/Keluraha
- Pembinaan peserta 1,500,000
n/Pokmas
- Reward umroh THL berprestasi Orang 38,000,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 690
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
258 Honorarium Banyuwangi Eco School
Honorarium Panitia Pelaksana kegiatan
- Ketua Org/Bln 500,000
-Wakil Org/Bln 400,000
- Sekretaris Org/Bln 300,000
- Bendahara Org/Bln 250,000
- Anggota Org/Bln 200,000
Pemberian hadiah Banyuwangi Eco School
- Juara I Sekolah 5,000,000
- Juara II Sekolah 4,000,000
- Juara III Sekolah 3,000,000
- Hadiah Pembinaan peserta BES Sekolah 1,000,000
- Pembina Terbaik I Orang 1,250,000
- Pembina Terbaik II Orang 1,000,000
- Pembina Terbaik III Orang 750,000
259 Honorarium Banyuwangi green and recycle fashion week
Honorarium Panitia pelaksana kegiatan
- Ketua Org/Aktv 1,000,000
- Wakil Org/Aktv 800,000
- Sekretaris Org/Aktv 700,000
- Bendahara Org/Aktv 500,000
- Anggota Org/Aktv 350,000
Pemberian hadiah Banyuwangi green and recycle fashion
a. Lomba tingkat mahasiswa/umum
- Juara I Orang 2,500,000
- Juara II Orang 2,250,000
- Juara III Orang 1,500,000
- Juara harapan I Orang 1,000,000
- Juara harapan II Orang 750,000
- Juara harapan III Orang 500,000
b. Lomba tingkat SMA/sederajat
- Juara I Orang 2,500,000
- Juara II Orang 2,250,000
- Juara III Orang 1,500,000
- Juara harapan I Orang 1,000,000
- Juara harapan II Orang 750,000
- Juara harapan III Orang 500,000
c. Lomba tingkat SMP/sederajat
- Juara I Orang 2,250,000
- Juara II Orang 2,000,000
- Juara III Orang 1,500,000
- Juara harapan I Orang 1,000,000
- Juara harapan II Orang 750,000
- Juara harapan III Orang 500,000
d. Lomba tingkat SD/sederajat

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 691
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Juara I Orang 2,000,000
- Juara II Orang 1,750,000
- Juara III Orang 1,500,000
- Juara harapan I Orang 1,250,000
- Juara harapan II Orang 1,000,000
- Juara harapan III Orang 500,000
e. Lomba tingkat TK
- Juara I Orang 1,750,000
- Juara II Orang 1,500,000
- Juara III Orang 1,250,000
- Juara harapan I Orang 1,000,000
- Juara harapan II Orang 750,000
- Juara harapan III Orang 500,000
260 Honor Fotografer /bln 2,000,000
261 Honor Kamerawan /bln 2,000,000
262 Honor Penulisan Artikel untuk Berita Skala Nasional /Artikel 1,000,000
263 Honor Operator Multimedia /bln 1,500,000
264 Honor Penulis Berita /bln 2,000,000
265 Honor Pengelola Media Sosial /bln 2,000,000
266 Honor Editor Berita /bln 2,500,000
267 Honor Dokumen Pemberitaan /bln 1,500,000
268 Honor Desain Grafis /bln 2,500,000
269 Honor Kegiatan Koordinasi Penyusunan Laporan
Keterangan Pertanggungjawaban (LKPJ)
- HONORARIUM PNS
1. Penanggungjawab Org/Aktv 500,000
2. Pengarah Org/Aktv 450,000
3. Ketua Org/Aktv 400,000
4. Sekretaris Org/Aktv 350,000
5. Anggota Org/Aktv 300,000
270 Pemberian Hadiah Uang Stan terbaik kegiatan Promosi /
Pameran Produk Koperasi dan UMKM
- Juara I 1,750,000
- Juara II 1,500,000
- Juara III 1,250,000
271 Honorarium Peserta Kegiatan Perkoprasian dan UMKM 100,000
274 Honorarium Narasumber / Tenaga Ahli Kegiatan
Perkoperasian dan UMKM Jpl 525,000

275 Honor Kegiatan Penataan Kelembagaan Pemerintah


Daerah
Honorarium PNS
Honorarium Panitia Pelaksanaan Kegiatan
Honor Tim Penyusun Raperda dan Raperbup Tentang OPD
- Ketua Org/Akt 2,500,000
- Wakil Ketua Org/Akt 2,000,000
- Sekretaris Org/Akt 1,600,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 692
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Anggota Org/Akt 1,325,000

276 Honor Tim Penyusunan Rancangan Produk Hukum :


Ketua' Org/Bln 1,500,000
Wakil Ketua Org/Bln 1,250,000
Sekretaris Org/Bln 1,000,000
Anggota Org/Bln 800,000

277 Honorarium Panitia Pelaksana Kegiatan Lomba Cipta


Menu
A. - Ketua Org/Akt 725,000
- Wakil Ketua Org/Akt 475,000
- Sekretaris Org/Akt 450,000
- Anggota Org/Akt 275,000
- Honorarium Juri Org/Akt 500,000
- Jasa Kebersihan Org/Hari 50,000

B. - Juara I Lomba Cipta Menu Kelompok 1,600,000


- Juara II Lomba Cipta Menu Kelompok 1,450,000
- Juara III Lomba Cipta Menu Kelompok 1,300,000
- Juara Harapan I Lomba Cipta Menu Kelompok 1,100,000
- Juara Harapan II Lomba Cipta Menu Kelompok 750,000
- Juara Harapan III Lomba Cipta Menu Kelompok 500,000

278 Honorarium Tim Monev Program Strategis SKPD dan


Program Unggulan Pemerintah Kab. Banyuwangi
Ketua Org/Akt 750,000
Wakil Ketua Org/Akt 700,000
Sekretaris Org/Akt 650,000
Anggota Org/Akt 600,000
Staf Sekretariat Org/Akt 500,000

279 Pengembangan Ketangguhan Masyarakat, Kegiatan :


a. Pembentukan Desa Tangguh Bencana (Fasilitator Kab. Org/Akt 1,000,000
Banyuwangi)
b. Penyusunan Kajian Resiko Bencana Kab. Banyuwangi Org/Akt 1,250,000
(Fasilitator Luar Kab. Banyuwangi dalam Prov. Jatim)
c. Penyusunan Rencana Penanggulangan Bencana (RPB)
Org/Akt 1,500,000
Kab. Banyuwangi (Fasilitator Luar Prov. Jatim)

Kegiatan Penyelenggaraan Rehabilitasi Dan Rekonstruksi


280 Pasca Bencana Sub Kegiatan Penyelenggaraan Pasca
Bencana
Honorarium PNS
1. Penanggung Jawab Kegiatan Org/Akt 1,250,000
2. Pengarah Pelaksana Kegiatan Org/Akt 1,000,000
3. Sekretaris Pelaksana Kegiatan Org/Akt 850,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 693
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
4. Anggota Tetap Pelaksana Org/Akt 750,000
5. Anggota Tidak Tetap Pelaksana Kegiatan Org/Akt 400,000
6. Anggota Tetap Pelaksana Kegiatan dan Administrasi Org/Akt 400,000
7. Peserta sosialisasi/pertemuan Org/Akt 100,000
Honorarium Non-PNS
8. Anggota Tetap Pelaksana Kegiatan Administrasi Org/Akt 350,000
9. Peserta sosialisasi/pertemuan Org/Akt 100,000

281 Honorarium Tim Pengawasan dan Pengendalian


Kepegawaian
- Tanggung Jawab Org/Akt 130,000
- Pengendali Teknis Org/Akt 120,000
- Ketua Tim Org/Akt 100,000
- Anggota Org/Akt 75,000

282 Honorarium Tim pertimbangan Penjatuhan Hukuman


Disiplin, Pemberian Ijin Perkawinan dan Perceraian
- Penanggung Jawab Org/Akt 400,000
- Pengendali Teknis Org/Akt 300,000
- Ketua Tim Org/Akt 250,000
- Anggota Org/Akt 200,000

283 Honorarium Tim Pembina Teknis Kabupaten Sehat


- Pembina Aktv 2,750,000
- Pengarah Aktv 2,500,000
- Ketua Aktv 2,250,000
- Wakil Ketua Aktv 2,000,000
- Sekretaris Aktv 1,750,000
- Wakil Sekretaris Aktv 1,500,000
- Ketua Pokja Aktv 1,250,000
- Anggota Pokja Aktv 1,000,000

284 Mamiri istimewa (Conato) Kotak 25,000

285 Operator Smart Kampung/SPM online Bulan 300,000

286 Honorarium Gugus Tugas Pengembangan Kabupaten


Layak Anak (KLA)
- Pengarah Aktv 3,500,000
- Penanggung Jawab Aktv 2,750,000
- Ketua Aktv 2,250,000
- Wakil Ketua Aktv 2,000,000
- Sekretaris Aktv 1,750,000
- Koordinator Klaster Aktv 1,500,000
- Anggota Klaster Aktv 1,000,000

287 Honorarium Kelompok Kerja Pengarusutamaan Gender


(PUG)
- Penanggung Jawab Aktv 3,500,000
- Pengarah Aktv 2,500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 694
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
- Ketua Aktv 2,250,000
- Wakil Ketua Aktv 2,000,000
- Sekretaris I Aktv 1,750,000
- Sekretaris II Aktv 1,500,000
- Anggota Aktv 750,000
Honorarium Tim Penyusun Dokumen Inventarisasi
288 Permasalahan, Isu Strategis dan Strategi Program
Pembangunan
- Pengarah Aktv 1,000,000
- Koordinator Aktv 750,000
- Anggota Aktv 500,000
Honorarium Tim Penyusun Dokumen Inventarisasi
289 Permasalahan, Isu Strategis dan Strategi Program
Pembangunan
- Pengarah Aktv 1,000,000
- Koordinator Aktv 750,000
- Anggota Aktv 500,000

290 Honorarium Operator IT Aktv 200,000

291 Honorarium Operator Komputer OB 2,500,000

292 Honor Kegiatan Anti Poverty Programme (APP)


Honor PNS
- Honor Tim Pembina, Narasumber Anti Poverty 500,000
Org/Aktv
Programme (APP) /Penyuluh Anti Poverty Programme
- Honor Pendamping
Org/Aktv 250,000
(APP)
Honor Non PNS
- Honor Moderator Anti Poverty Programme (APP) Org/Aktv 250,000
- Honor Tenaga Konsultan Kecamatan (KTK) Pengalaman 3,600,000
Org/Bln
1-3 Th Pendamping Kelompok Masyarakat Pengalaman
- Honor
Org/Bln 1,300,000
2-3 Th Pendamping Kelompok Masyarakat Pengalaman 1
- Honor
Org/Bln 1,150,000
Th
- Honor Pendamping Kelompok Masyarakat Pengalaman 0
-Th
Honor Rapat, Pembinaan Musdes Anggota Anti Poverty Org/Bln 1,000,000
Programme (APP) Org/Aktv 100,000

293 Kebutuhan Honorarium Tim Pengamanan


- Ketua Org/Aktv 750,000
- Anggota Org/Aktv 750,000
- Anggota Org/Aktv 750,000
- Anggota Org/Aktv 750,000
- Anggota Org/Aktv 200,000
- Anggota Org/Aktv 200,000
- Anggota Org/Aktv 200,000
- Anggota Org/Aktv 200,000

294 Kebutuhan Honorarium Tim Pelantikan


- Ketua Org/Aktv 1,000,000
- Wakil Ketua Org/Aktv 850,000
- Sekretaris Org/Aktv 750,000
Rohaniwan dan pembaca doa Org/Aktv 500,000
Pramu acara Org/Aktv 500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 695
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
Pembantu umum Org/Aktv 300,000
295 Kebutuhan Honorarium Tim Kabupaten
- Pelindung Org/Aktv 2,500,000
- Penasehat Org/Aktv 2,000,000
- Ketua Merangkap Anggota Org/Aktv 1,500,000
- Sekretaris Merangkap Anggota Org/Aktv 1,250,000
- Anggota Org/Aktv 1,000,000
- Anggota Org/Aktv 1,000,000
- Anggota Org/Aktv 1,000,000
- Anggota Org/Aktv 1,000,000
- Anggota Org/Aktv 1,000,000
- Anggota Org/Aktv 1,000,000
296 Kebutuhan Honorarium Sekretariat Tim
- Kepala Sekretariat Org/Aktv 1,500,000
- Kepala Urusan Umum Org/Aktv 1,000,000
Staf urusan umum Org/Aktv 750,000
- Kepala Urusan Logistik Org/Aktv 1,000,000
Staf urusan logistik Org/Aktv 750,000
- Kepala Urusan Fasilitasi Permasalahan Pilkades Org/Aktv 1,000,000
Staf urusan fasilitasi permasalahan pilkades Org/Aktv 750,000
- Kepala urusan teknis e-voting Org/Aktv 1,000,000
Staf urusan teknis e-voting Org/Aktv 750,000
297 Kebutuhan Honorarium Tim Pengawasan
- Forkopimcam
Pengawas Kecamatan Org/Aktv 750,000
Pengawas Kecamatan Org/Aktv 750,000
Panitia Pemilihan Kabupaten Org/Aktv 750,000
- Tiga pilar
Pengawas Desa Org/Aktv 500,000
Pengawas Desa Org/Aktv 500,000
Pengawas Desa Org/Aktv 500,000
298 Honorarium KPPS
1. Ketua merangkap anggota Org/Aktv 400,000
2. Wakil ketua merangkap anggota Org/Aktv 300,000
3. Sekretaris merangkap anggota Org/Aktv 200,000
4. Anggota Org/Aktv 200,000
5. Linmas Org/Aktv 200,000
299 Honorarium Panitia Desa
1. Ketua Org/Aktv 500,000
2. Wakil ketua Org/Aktv 400,000
3. Sekretaris I Org/Aktv 300,000
4. Sekretaris II Org/Aktv 300,000
5. Bendahara Org/Aktv 300,000
6. Seksi/Anggota Org/Aktv 200,000
300 Pengadaan TPS Paket 500,000
301 Bilik Suara Buah 150,000
302 Kotak Surat Suara Buah 150,000
303 Bantalan Buah 50,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 696
Besaran Honor
NO. URAIAN KEGIATAN SATUAN
(Rp.)
304 Alat Pencoblos / Paku Buah 10,000
305 Tinta Buah 50,000
306 Surat Suara Lembar 1,000

307 Honorarium Panitia Pelaksana Kegiatan Banyuwangi


Children Center
- Ketua Org/Aktv 500,000
- Sekretaris Org/Aktv 400,000
- Anggota Org/Aktv 300,000
- Petugas Administrasi Org/Aktv 200,000
- Nara Sumber Org/Aktv 500,000

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 697
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 698
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 699
KETERANGAN

(Wandra,
Sulianah, Demy)

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 700
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 701
KETERANGAN

Dinas Pertanian

Khusus
Sekretariat
Khusus Rumah
Jab. Bupati dan
Wabub

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 702
KETERANGAN

Dinas Kelautan dan perikanan

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 703
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 704
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 705
KETERANGAN

Dinas Pengairan

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 706
KETERANGAN

Pariwisata

Humas

Dinas Koperasi

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 707
KETERANGAN

Khusus RSUD /
BLUD

Khusus Pegawai
BLUD

Khusus Pegawai
BLUD

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 708
KETERANGAN

Bag. Umum

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 709
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 710
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 711
KETERANGAN

Besaran honor
Orang Per paket
Mengacu pada
Permenku Nomor
65/PMK.02/2015
Tentang Standar
Biaya Masukan
TA 2016

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 712
KETERANGAN

Inspekturat

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 713
KETERANGAN

inspekturat

inspekturat

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 714
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 715
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 716
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 717
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 718
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 719
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 720
KETERANGAN

Bag. Hukum

Bag. Hukum

Bag. Hukum

Bag. Hukum

Bag. Hukum

Bag. Hukum

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 721
KETERANGAN

LH
LH
LH

LH
LH

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 722
KETERANGAN

LH
LH

LH
LH
LH
LH
LH
LH

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 723
KETERANGAN

sekda

Pembangunan

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 724
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 725
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 726
KETERANGAN

Dinas sosial

Dinas sosial

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 727
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 728
KETERANGAN

kesbangpol

sudah termasuk
JAMSOSTEK
sudah termasuk
JAMSOSTEK

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 729
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 730
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 731
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 732
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 733
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 734
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 735
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 736
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 737
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 738
KETERANGAN

BAPPEDA PPN + PPH


BAPPEDA PPN + PPH
Perpusta
kaan

BAPPEDA PPN + PPH


BAPPEDA PPN + PPH

BAPPEDA PPN + PPH


BAPPEDA PPN + PPH
BAPPEDA PPN + PPH

PERPUSTAKAAN PPN + PPH


PERPUSTAKAAN PPN + PPH
PERPUSTAKAAN PPN + PPH

PERPUSTAKAAN PPN + PPH

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 739
KETERANGAN

PERPUSTAKAAN PPN + PPH


PERPUSTAKAAN PPN + PPH
PERPUSTAKAAN PPN + PPH

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 740
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 741
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 742
KETERANGAN

Khusus RSUD / BLUD

Khusus RSUD / BLUD

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 743
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 744
KETERANGAN

BPMKB

BPM

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 745
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 746
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 747
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 748
KETERANGAN

Kesbangpol

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 749
KETERANGAN

dinas pendapatan

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 750
KETERANGAN

Berlaku Khusus

kesbangpol

kesbangpol

kesbangpol

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 751
KETERANGAN

kesbangpol

kesbangpol

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 752
KETERANGAN

Dinas sosial

Kesbangpol

Kesbangpol

Kesbangpol

Kesbangpol

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 753
KETERANGAN

Kesbangpol

Kesbangpol

Kesbangpol

Kesbangpol

Kesbangpol

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 754
KETERANGAN

Kesbangpol

Kesbangpol

DKP

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 755
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 756
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 757
KETERANGAN

Bag. Humas
Bag. Humas
Bag. Humas
Bag. Humas
Bag. Humas
Bag. Humas
Bag. Humas
Bag. Humas
Bag. Humas

Bag. Pembangunan

Dinas Koperasi

Dinas Koperasi

Dinas Koperasi

bag. Organisasi

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 758
KETERANGAN

Hukum

Ketahanan pangan

Pembangunan

BPBD

BPBD

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 759
KETERANGAN

BKD

BKD

BAPEDA

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 760
KETERANGAN

Bag. Pemerintahan

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 761
KETERANGAN

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 762
KETERANGAN

Bag. Kesra

Standar Satuan Harga Belanja Daerah


Kabupaten Banyuwangi Tahun 2017 763
Standar Satuan Harga Belanja Daerah
Kabupaten Banyuwangi Tahun 2017 764
81 MCB 25A 3 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs
82 MCB 32A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs
83 MCB 32A 3 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs
84 MCB 40A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs
85 MCB 40A 3 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs
86 MCB 4A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs
87 MCB 6A 1 PHASE ( MERLIN GERIN ) MERLIN GERIN Pcs
88 Piting Mercury Buah
89 Pitingan TL 40 watt Buah
92 Sekering kas lokal 1 group Buah
95 Servis Kabel Buah
96 Skakelar (Broco) Engkel Buah
98 Skakelar broco seri Buah
101 SON - T 150 W PHILIPS PHILIPS Pcs
102 SON - T 250 W PHILIPS PHILIPS Pcs
103 SON - T 400 W PHILIPS PHILIPS Pcs
117 Stater TL 40 watt Buah
118 Stop Kontak (Broco) Buah
120 Tabung TL 40 watt (Philips) Buah
123 Trafo 250 watt Buah
124 Trafo 40 watt sinar Buah
125 Trafo 40 watt Tens Buah
126 Trafo 400 watt Buah
127 Trafo mercury 125 watt Buah
142 mC 25 Ampere Buah
144 Tarikan kabel/Service Buah
145 Tiem Switch Unit
147 Time Switch / Photocell Unit
155 Grounding Set
157 Dop merkury ml 100 watt Buah
158 Dop merkury ml 250 watt Buah
159 Dop merkury ml 500 watt Buah
160 Son T 250 Buah
161 Esensial 23 watt Buah
162 Travo 250 Watt mercury Buah
163 Travo 40 Watt Buah
164 mC 50 A Buah
165 Fitingan mercury 250 Watt Buah
169 MCB 20 A Buah
170 MCB 25 A Buah
171 MCB 32 A Buah
172 Konektor Kabel Buah
174 Ignitor SN 58 Buah
176 Foto Cell 6 A Selcon Buah
178 Kabel TC 2 x 10 mm meter
181 Kabel NYY 2 x 2,5 mm Roll
182 Lampu HPIT 400 Watt Roll
183 Isolasi Unibal Buah
184 Tang Amper Buah
188 Kap Piring Dop mercury 250 Watt Buah
189 mC 80 A Buah
191 Fitingan TL 40 Watt Set
192 Testpen Buah
193 Avometer Buah
194 Box MCB 12 grup Buah
195 ELCB 3 x 40 A 1 Pahse Buah
196 ELCB 3 x 25 A 3 Pahse Buah
197 TEE Dos Buah
198 In Bodos Buah
199 Lampu TL RMI 2 x 20 watt reflektor Set
200 Kabel NYM 2 x 2,5 Externa m'
Eterna Roll/100
201 DL cover 3,5" Vocalux Buah
202 LED BULB 8 W Philips Buah

BAHAN INSTALASI LISTRIK


1 Panel KWH Buah
2 MCB 10 - 20 A 1 Phase Buah
3 Box Panel 20 x 80 x 60 Buah
4 Kabel TC 2 x 70 + 1 x 50 meter
231,700
54,000
254,700
63,200
262,200
54,000
47,100
11,500
8,600
37,900
2,800
12,000
16,100
112,100
133,900
143,700
4,600
13,200
16,100
230,000
43,100
43,100
266,800
135,700
184,000
2,800
506,000
103,500
19,500
48,300
70,100
94,800
133,900
47,700
230,000
43,100
437,000
23,000
47,100
52,900
54,000
9,200
43,100
103,500
5,700
1,765,200
97,700
5,700
241,500
14,300
931,500
8,600
18,900
184,000
105,800
385,200
529,000

368,000
9,400
948,700
46,000
35,600

644,000
47,100
643,800
66,400
HARGA SATUAN BAHAN DAN UPAH
No Jenis Pekerjaan Merk Sat
PEKERJAAN LISTRIK
1 PANEL P-KIOS-1 ~ KIOS 8 Setara INTIMUARA unit
2 PANEL P-PP-1 ~ PP-7 Setara INTIMUARA unit
3 PANEL SDP-KIOS Setara INTIMUARA unit
4 PANEL SDP-LAPAK Setara INTIMUARA unit
5 PANEL KANTOR Setara INTIMUARA unit
6 PANEL KANTOR Setara INTIMUARA unit
7 PANEL LVMDP Setara INTIMUARA unit
8 PANEL KAPASITOR BANK Setara INTIMUARA unit
9 PANEL PJU Setara INTIMUARA unit
10 PANEL PD-POMPA Setara INTIMUARA unit
11 PANEL PENERANGAN unit
12 PANEL TPS Setara INTIMUARA unit
13 KARTU PRABAYAR + PRINTER unit
14 GROUNDING BC 35MM PANEL DISTRIBUSI LS
15 GROUNDING BC 70MM PANEL UTAMA LS
16 GROUNDING BC 16MM GERBANG,POS,TPS LS
17 GROUNDING BC 50MM ELEKTRONIK LS
18 GROUNDING BC 50MM LVMDP LS
19 Lampu TL 2x20 (40 watt) Setara Philips unit
20 LAMPU EXIT Setara Philips unit
21 Lampu TL Philip 36 watt Setara Philips unit
22 LAMPU TL 1 x 18 W BALK ( set komponen ) Setara ARTOLITE unit
LAMPU TKO TLD 1 x 18 W ( set komponen ) Setara ARTOLITE unit
LAMPU TKO TLD 1 x 36 W ( set komponen ) Setara ARTOLITE unit
LAMPU TKI TLD 1 x 36 W ( set komponen ) Setara ARTOLITE unit
23 LAMPU TL DOWN LIGHT Setara ARTOLITE unit
LAMPU Downlight PL C 10 W Setara ARTOLITE unit
24 LAMPU 1 x 36 GMS Setara ARTOLITE unit
25 LAMPU BARET 1 X 36 W Setara ARTOLITE unit
26 LAMPU 1 X 36 W TKI Setara ARTOLITE unit
27 LAMPU 2 X 36 W TKI Setara ARTOLITE unit
Lampu Sorot MHNTD 70 W Warna 730 unit
28 LAMPU FITTING -27 Setara ARTOLITE unit
29 LAMPU SPP 368 Setara SPP 368 1x250WBG SI unit
30 KABEL NYY 4 x 16 mm Setara SUPREME mtr
31 KABEL NYY 4 x 4 mm Setara SUPREME mtr
32 KABEL NYM 3 x 4 mm Setara SUPREME mtr
33 KABEL NYM 2 x 2,5 mm Setara SUPREME mtr
34 KABEL NYY 4 x 10 mm Setara SUPREME mtr
35 KABEL YMHY 3 x 1,5 mm Setara SUPREME mtr
36 KABEL NYFGBY 4 x 10 mm Setara SUPREME mtr
37 KABEL NYFGBY 4 x 16 mm Setara SUPREME mtr
38 KABEL NYFGBY 4 x 10 mm Setara SUPREME mtr
39 KABEL NYFGBY 3 x 2,5 mm Setara SUPREME mtr
40 KABEL N2XSY 3 X 1 X 50 MM Setara SUPREME mtr
41 KABEL NYY 2(4X1X240MM) Setara SUPREME mtr
42 KABEL FRC 4 X 95 MM Setara KABELMETAL mtr
43 KABEL FRC 2( 4 X 35 MM) Setara KABELMETAL mtr
44 KABEL FRC 2( 4 X 6 MM) Setara KABELMETAL mtr
45 KABEL NYY 2 (4 X 4 MM) Setara SUPREME mtr
46 KABEL NYFGBY 2(4X95 MM2) Setara SUPREME mtr
47 KABEL NYFGBY 4 X 25 MM Setara SUPREME mtr
48 KABEL NYY 3 x 2,5 MM Setara SUPREME mtr
49 KABEL TRAY 300 X 50 MM Setara INTERACK mtr
50 KABEL TRAY 200 X 50 MM Setara INTERACK mtr
51 KABEL TRAY 400 X 50 MM Setara INTERACK mtr
52 ELBOW CROS, TEE unit
53 JOINTING unit
54 PENGGANTUNG unit
55 BESI SIKU 30 x 30 x 3mm Btg
56 CEILLING FAN unit
57 SAKLAR TUNGGAL Setara BROCO unit
58 SAKLAR DOUBLE Setara BROCO unit
59 STP KONTAK Setara BROCO unit
60 STP KONTAK AC Setara BROCO unit
61 KWH METER Setara ACTUVIS unit
62 MCB unit
63 BOX MCB unit
64 VENTILATOR ROOF unit
65 Roof Drain Cast Iron Ø 10 " unit
66 COLOUM SPEAKER 10 W SetaraTOA unit
67 CEILING SPEAKER 6 W SetaraTOA unit
68 POWER AMPLIFIER 240 W SetaraTOA unit
69 MIXER SetaraTOA unit
70 ZONE CALL STATION SetaraTOA unit
71 DVC, MP3 PLAYER SetaraTOA unit
72 PAGING MICROPHONE SetaraTOA unit
73 VOLUME CONTROL SetaraTOA unit
74 KABINET RACK SetaraTOA unit
75 TESTING Set
76 TIANG PJU T 9 MTR unit
77 NYM 3 x 2,5mm2 Setara Supreme m'
78 NYMHY 3 x 1,5 mm Setara Supreme m'
79 FLEXIBLE KONDUIT 20MM m'
80 PIPA KONDUIT 20MM m'
- Fitting ( elbow ,male bush, Joint coupling) bh
- Saddle/Klem bh
- Fresher dan Scrup bh
- Juntion box bh
- Tee Dos bh
UPAH
Harga 2018 Harga usulan 2019 HPS

4,043,812.75
2,205,506.70
14,222,068.81
15,171,014.31
7,792,675.20
7,792,675.20
73,659,663.60
47,175,736.50
3,623,072.00
23,388,676.05
5,156,161.10
2,205,506.70
13,912,750.00
1,492,022.50
3,084,792.50
695,637.50
2,162,713.00
2,162,713.00
149,400.00
12,050.00
118,018.50
88,274.00
134,330.00
222,508.05
190,652.65
91,152.50
123,775.50
343,501.00
217,806.50
233,158.50
309,918.50
542,117.50
23,987.50
1,942,795.60
67,165.00
21,804.64
14,536.43
9,448.68
48,697.02
8,956.38
53,960.97
83,033.82
53,960.97
18,721.15
117,260.50
1,883,920.68
553,221.45
451,117.60
119,287.84
43,609.28
806,110.84
121,357.12
10,902.32
170,215.30
131,835.30
208,691.25
91,152.50
33,582.50
55,651.00
67,165.00
599,687.50
9,595.00
9,595.00
10,554.50
14,680.35
105,545.00
33,582.50
23,987.50
815,575.00
326,230.00
471,114.50
74,841.00
2,659,734.00
2,659,734.00
4,678,627.55
2,892,892.50
1,173,468.50
140,470.80
7,771,950.00
5,469,150.00
2,820,930.00
12,953.25
8,956.38
6,236.75
2,494.70
335.83
335.83
335.83
9,499.05
9,499.05
USULAN 2019
BPKADCIPTA KARYA
BINA MARGA
PENATAAN RUANG

8300 8900
100.00%
95.95%
4,043,813 4,214,500 95.95%
2,205,507 2,298,600 95.95%
14,222,069 14,822,375 95.95%
15,171,014 15,811,375 95.95%
7,792,675 8,121,600 95.95%
7,792,675 8,121,600 95.95%
73,659,664 76,768,800 95.95%
47,175,737 49,167,000 95.95%
3,623,072 3,776,000 95.95%
23,388,676 24,375,900 95.95%
5,156,161 5,373,800 95.95%
2,205,507 2,298,600 95.95%
13,912,750 14,500,000 95.95%
1,492,023 1,555,000 95.95%
3,084,793 3,215,000 95.95%
695,638 725,000 95.95%
2,162,713 2,254,000 95.95%
2,162,713 2,254,000 95.95%
204,374 213,000 95.95%
899,052 937,000 95.95%
118,019 123,000 95.95%
88,274 92,000 95.95%
134,330 140,000 95.95%
222,508 231,900 95.95%
190,653 198,700 95.95%
91,153 95,000 95.95%
123,776 129,000 95.95%
343,501 358,000 95.95%
217,807 227,000 95.95%
233,159 243,000 95.95%
309,919 323,000 95.95%
542,118 565,000 95.95%
23,988 25,000 95.95%
1,942,796 2,024,800 95.95%
67,165 70,000 95.95%
21,805 22,725 95.95%
14,536 15,150 95.95%
9,449 9,848 95.95%
48,697 50,753 95.95%
8,956 9,334 95.95%
53,961 56,239 95.95%
83,034 86,539 95.95%
53,961 56,239 95.95%
18,721 19,511 95.95%
117,260 122,210 95.95%
1,883,921 1,963,440 95.95%
553,221 576,573 95.95%
451,118 470,159 95.95%
119,288 124,323 95.95%
43,609 45,450 95.95%
806,111 840,136 95.95%
121,357 126,480 95.95%
10,902 11,363 95.95%
170,215 177,400 95.95%
131,835 137,400 95.95%
208,691 217,500 95.95%
91,153 95,000 95.95%
33,583 35,000 95.95%
55,651 58,000 95.95%
67,165 70,000 95.95%
599,688 625,000 95.95%
9,595 10,000 95.95%
9,595 10,000 95.95%
10,555 11,000 95.95%
14,680 15,300 95.95%
105,545 110,000 95.95%
33,583 35,000 95.95%
23,988 25,000 95.95%
815,575 850,000 95.95%
326,230 340,000 95.95%
471,115 491,000 95.95%
74,841 78,000 95.95%
2,659,734 2,772,000 95.95%
2,659,734 2,772,000 95.95%
4,678,628 4,876,110 95.95%
2,892,893 3,015,000 95.95%
1,173,469 1,223,000 95.95%
140,471 146,400 95.95%
7,771,950 8,100,000 95.95%
5,469,150 5,700,000 95.95%
2,820,930 2,940,000 95.95%
11580 12,953 13,500 95.95%
8,956 9,334 95.95%
6,237 6,500 95.95%
2,495 2,600 95.95%
336 350 95.95%
336 350 95.95%
336 350 95.95%
9,499 9,900 95.95%
9,499 9,900 95.95%
20 Pipa Besi Q 8" Meter 598,500
Pipa Besi Q 6" Meter 315,000
Pipa Besi Q 5" Meter 210,000
Pipa Besi Q 2,5" Meter 115,000
Pipa Besi Q 2" Meter 42,000
Pipa Besi Q 1,25" Meter 36,750
Pipa kotak 20.40.1,2 lonjor (6m) 69,000
Pipa kotak 40.40.1,2 lonjor (6m) 97,700
Pipa kotak 40.60.1,4 lonjor (6m) 103,500
Pipa kotak 40.60.1,6 lonjor (6m) 161,000
Pipa kotak 40.40.1,6 lonjor (6m) 175,900
Pipa kotak 40.80.1,4 lonjor (6m) 190,900
Pipa kotak 40.80.1,8 lonjor (6m) 239,200
Pipa kotak 50.50.1,2 lonjor (6m) 117,300
Pipa kotak 50.50.1,4 lonjor (6m) 138,000
Pipa kotak 50.100.1,6 lonjor (6m) 261,000
Pipa kotak 50.100.2,3 lonjor (6m) 292,100
Pipa kotak 100.100.1,8 lonjor (6m) 431,200
Pipa kotak galvanis 20.40.1,2 lonjor (6m) 79,300
Pipa kotak galvanis 40.40.1,2 lonjor (6m) 116,100
Pipa kotak galvanis 40.60.1,2 lonjor (6m) 171,300
Pipa kotak galvanis 40.80.1,2 lonjor (6m) 201,200
Wiremesh 2.1 x 5.4 (5 mm) Lembar 259,600
Wiremesh 2.1 x 5.4 (8 mm) Lembar 664,100
Wiremesh 2.1 x 5.4 (10 mm) Lembar 1,062,600
21 Wiremesh 2.1 x 5.4 (12 mm) Lembar 1,561,200
22 Baja WF Jembatan (Finish galvanis) kg 32,775
21 Perforated Metal m2
22 ACP PVDF 1.22x4.88x4mm Seven m2 816,500
ACP PVDF Glosy 1.22x4.88x4mm Seven m2 782,000
ACP PE 1.22x4.88x4mm Seven m3 667,000
23 Hollow 2/4 - 4m plafond btg 28,700
24 Hollow 4/4 - 4m plafond btg 34,500
25 Galvalume C-075 kencana, winstar,Bima btg (6m) 89,700
Galvalume C-080 kencana, winstar btg (6m) 119,600
26 Galvalume reng kencana btg 46,500
27 Tali air m 5,700
28 Pagar BRC (60 x 240) 5 mm lembar 175,900
Pagar BRC (90 x 240) 6 mm lembar 187,400
Pagar BRC (120 x 240) 6 mm lembar 253,000
Pagar BRC (177x 240) 7.5 mm lembar 301,300
29 Seng talang 60 : 0,20 m 31,600
Seng talang 90 : 0,21 m 22,400
30 Kawat berduri 1 roll = 25-30 m roll 83,300
Kawat nyamuk biasa roll 109,200
31 Penangkal petir Unit 3,356,400
HARGA SATUAN BAHAN DAN UPAH
No Jenis pekerjaan Merk Sat Harga 2018
PEKERJAAN INSTALASI MEKANIKAL
1 Pipa Black Steel Sch 40 Ø 8" Setara SPINDO m1 501,736.54
2 Pipa Black Steel Sch 40 Ø 6" Setara SPINDO m1 339,207.24
3 Pipa Black Steel Sch 40 Ø 4" Setara SPINDO m1 194,627.78
4 Pipa Black Steel Sch 40 Ø 3" Setara SPINDO m1 145,492.18
5 Pipa Black Steel Sch 40 Ø 2.1/2" Setara SPINDO m1 105,722.11
6 Fitting TEE BS Ø 6" x 2 1/2" Bh 309,918.50
7 Fitting TEE BS Ø 6" x 6" Bh 261,943.50
8 Fitting TEE BS Ø 3" x 2 1/2" Bh 121,376.75
9 Fitting TEE BS Ø 2 1/2" x 1 1/2" Bh 99,308.25
10 Fitting ELBOW BS Ø 6" Bh 154,479.50
11 Fitting ELBOW BS Ø 2 1/2" Bh 30,895.90
12 Pipa GIP Medium Ø 1/2" Setara SPINDO m1 18,057.79
13 Pipa GIP Medium Ø 3/4" Setara SPINDO m1 23,240.69
14 Pipa GIP Medium Ø 1.1/4" Setara SPINDO m1 46,303.87
15 Pipa GIP Medium Ø 1.1/2" Setara SPINDO m1 53,201.80
16 Pipa GIP Medium Ø 2" Setara SPINDO m1 74,807.42
17 Pipa GIP Medium Ø 2.1/2" Setara SPINDO m1 94,108.96
18 Pipa GIP Medium Ø 3" Setara SPINDO m1 124,578.28
19 Pipa GIP Medium Ø 4" Setara SPINDO m1 177,843.33
20 Pipa GIP Medium Ø 4" Setara SPINDO Btg 997,400.25
21 Pipa PVC Klas AW Ø 2" Setara VINILON m1 14,824.28
22 Pipa PVC Klas AW Ø 3" Setara VINILON m1 30,056.34
23 Pipa PVC Klas AW Ø 4" Setara VINILON m1 48,730.61
24 Pipa PVC Klas AW Ø 5" Setara VINILON m1 78,774.95
25 Pipa PVC Klas AW Ø 6" Setara VINILON m1 108,087.68
26 Pipa PVC Klas AW Ø 8" Setara VINILON m1 182,808.74
27 Pipa PVC Klas AW Ø 10" Setara VINILON m1 274,860.77
28 Pipa PVC Klas AW Ø 10" Setara VINILON btg 1,099,443.08
29 Fitting Elbow PVC Ø 4" Setara RUCIKA Bh 49,874.81
30 Fitting Tee PVC Ø 4" Setara RUCIKA Bh 60,333.36
31 Fitting Elbow PVC Ø 6" Setara RUCIKA Bh 114,799.38
32 Fitting TY PVC Ø 6" Setara RUCIKA Bh 109,383.00
33 Fitting Elbow PVC Ø 5" Setara RUCIKA Bh 68,546.68
34 Fitting TY PVC Ø 5" Setara RUCIKA Bh 48,665.84
35 Fitting Elbow PVC Ø 3" Setara RUCIKA Bh 24,347.31
36 Fitting TY PVC Ø 3" Setara RUCIKA Bh 16,412.25
37 Fitting Elbow PVC Ø 2" Setara RUCIKA Bh 9,676.56
38 Fitting TY PVC Ø 2" Setara RUCIKA Bh 7,508.09
39 Fitting Elbow PVC Ø 8" Setara RUCIKA Bh 260,048.49
40 Fitting TY PVC Ø 8" Setara RUCIKA Bh 362,082.20
41 Elbow 90 PVC Ø 10" Setara RUCIKA Bh 228,504.93
42 Elbow 45 PVC Ø 10" Setara RUCIKA Bh 165,326.65
43 Lem PVC Klg 29,648.55
44 Bak Kontrol 100 x 60 x 500 Unit 815,575.00
45 Indoor Hydrant Box A2 Setara VENUS Unit 1,017,549.75
46 Fire Hose : 1,5" x 30 mtr Setara VENUS Unit 920,640.25
47 Hose Nozzle : 1,5" Setara VENUS Unit 324,646.83
48 Hose Rack : 1,5 " Setara VENUS Unit 242,273.75
49 Hydrant Valve : 1,5" Setara VENUS Unit 300,419.45
50 Hydrat Valve : 2,5" Setara VENUS Unit 709,377.54
51 Indoor Hydrant Box C Setara VENUS Unit 1,017,549.75
52 Fire Hose : 2,5" x 30 mtr Setara VENUS Unit 1,349,949.34
53 Hose Nozzle : 2 1/2" Setara VENUS Unit 518,465.83
54 Hydrant PillarType H14AP Setara VENUS Unit 2,955,739.75
55 Siamesse Connection Type s7 Unit 3,120,485.90
56 Ac Split Wall Kap. 2,5 PK Setara DAIKIN unit 10,206,201.50
57 Ac Split Wall Kap. 2 PK Setara DAIKIN unit 7,145,396.50
58 Ac Split Wall Kap. 1,5 PK Setara DAIKIN unit 4,211,245.50
59 Ac Split Wall Kap. 1 PK Setara DAIKIN unit 3,050,250.50
60 Ac Split Wall Kap. 1/2 PK Setara DAIKIN unit 2,734,575.00
61 POMPA TRANSFER Setara EBARA unit 17,094,835.80
62 Pondasi Pompa unit 935,512.50
63 Elektrode WLC Set 3,790,025.00
64 BUTTERFLY VALVE DIA 150 Setara KITZ unit 1,211,368.75
65 BUTTERFLY VALVE DIA 100 Setara KITZ unit 775,276.00
66 BUTTERFLY VALVE DIA 80 Setara KITZ unit 678,366.50
67 GATE VAVE DIA 50 MM Setara KITZ unit 602,566.00
68 GATE VAVE DIA 25 MM Setara KITZ unit 240,834.50
69 CHECK VAVE DIA 100 MM Setara KITZ unit 1,966,975.00
70 FLEXIBLE JOINT DIA 80 MM Setara KITZ unit 335,825.00
71 STRAINER DIA 80 MM Setara KITZ unit 1,871,025.00
72 FOOT VALVE DIA 80 MM unit 3,252,705.00
73 PRESSURE SWITCH unit 719,625.00
74 PRESSURE GAUGE unit 427,937.00
75 TANGKI FIBERGLASS Setara BIOSEVEN unit 81,077,750.00
76 KRAN DIA 1/2" Setara TOTO Bh 180,386.00
77 PENGUKURAN & BOUWPLANK m1 86,447.35
78 GALIAN m1 33,030.79
79 PASIR m1 68,268.43
80 URUGAN PADAT m1 100,507.63
81 VENTILATOR ROOF unit 815,575.00
82 CEILLING FAN unit 479,750.00
83 EXHAUST FAN KAP. 1000 CFM unit 239,875.00
84 EXHAUST FAN KAP. 3000 CFM unit 326,230.00
85 PIPA REFRIGERANT + DRAIN unit 52,772.50
86 BAK KONTROL unit 1,799,062.50
87 BAK KONTROL CO unit 1,703,112.50
88 CLEAN OUT unit 331,027.50
89 BIAYA PENYAMBUNGAN PDAM Unit 1,575,499.00
90 PUTM IM Setara SCHNEIDER ELECRIC unit 26,306,083.78
91 PUTM QM Setara SCHNEIDER ELECRIC unit 41,530,566.23
92 TRAFO Setara TRAFINDO unit 117,745,042.50
93 TERMINASI KABEL LVMDP unit 1,203,213.00
94 TERMINASI KABEL TRAFO unit 6,576,413.00
95 COPPER PLATE UK. 40Mx3MM Set 215,887.50
96 ISOLATOR Set 6,236.75
97 MEGGER TEST Set 6,668,525.00
98 PONDASI PJU Set 2,149,280.00
99 CROSSING JALAN PIPA GIP Ø 6" Btg 2,341,180.00
100 PENANGKAL PETIR setara ERICO SYSTEM 3000 Set 40,059,125.00
- Lighning Protection Radius 100
- Kabel Penghantar Coaxial q 70 mm
- Arde/Grounding Max. 3 Ohm (BC 50 mm & Bak Kontrol)
- Tiang tinggi 5 mtr di atas Bangunan Pipa GIP 2"
- Ijin Depnaker
101 Fitting - Fitting GIP
Tee GIP 100mm bh 152,944.30
Tee GIP 80mm bh 84,531.95
Tee GIP 65mm bh 64,478.40
Tee GIP 50mm bh 28,209.30
Tee GIP 40mm bh 18,998.10
Tee GIP 32mm bh 14,968.20
Tee GIP 25mm bh 9,882.85
Tee GIP 20mm bh 6,332.70
Tee GIP 15mm bh 4,317.75
Elbow GIP 100mm bh 116,771.15
Elbow GIP 80mm bh 64,478.40
Elbow GIP 65mm bh 42,313.95
Elbow GIP 50mm bh 22,164.45
Elbow GIP 40mm bh 14,104.65
Elbow GIP 32mm bh 11,322.10
Elbow GIP 25mm bh 7,100.30
Elbow GIP 20mm bh 4,893.45
Elbow GIP 15mm bh 3,454.20
Water Mur 15mm bh 9,595.00
Water Mur 20mm bh 13,433.00
Water Mur 25mm bh 16,311.50
Socket GIP 50mm bh 16,119.60
Socket GIP 40mm bh 10,554.50
Socket GIP 32mm bh 8,539.55
Socket GIP 25mm bh 6,044.85
Socket GIP 20mm bh 3,646.10
Socket GIP 15mm bh 2,878.50
Kawat Las RB26 Dus 115,140.00
Kawat las kg 29,900.00
Ivoxy Primatone Klg 33,582.50
Flange DIA 150 bh 350,217.50
Flange DIA 100 bh 280,174.00
Flange DIA 80 bh 175,108.75
Baut bh 57,570.00
Packing bh 46,056.00
Packing bh 40,299.00
Packing bh 23,028.00
Zinkromate kg 30,032.35
Tinner A setara bintang/cemerlang Ltr 9,307.15
Cat Finish setara Altek kg 14,891.44
KABUPATEN

No Jenis Pekerjaan

Homogenius tile 80 x 80 BELLEZA - Calacatta GBP10 Polishe


Homogenius tile 60 x 60 BELLEZA - Silky White GBL01 Polish
Homogenius tile 60 x 120 BELLEZA - Silky White GBL01 Polis

Homogenius tile 60 x 60 BIANCO LUNA- Silky White GBL01 M


Homogenius tile 60 x 120 BIANCO LUNA- Silky White GBL01
Homogenius tile 30 x 60 BIANCO LUNA- White GCM01 Satin

Homogenius tile 60 x 60 CEMENTUM- Beige GCM02 Matt


Homogenius tile 30 x 60 CEMENTUM- Amber White GCU01 M
Homogenius tile 60 x 60 CEMENTUM- Antique Ivory GCU02 M

Homogenius tile 60 x 120 CEMENTOUS- Ash Grey GCU03 Ma


Homogenius tile 30 x 60 CEMENTOUS- Amber White GCU01

Homogenius tile 60 x 60 CEMENTOUS- Antique Ivory GCU02 S


Homogenius tile 60 x 120 CEMENTOUS- Ash Grey GCU03 Str
Homogenius tile 30 x 60 CEMENTOUS- Lilac GCA01 Structur
Homogenius tile 60 x 60 CEMENTOUS- Wheat GCA02 Structu

Homogenius tile 45 x 90 CLAY ART - Khaki GCA03 Matt & Illus


Homogenius tile 80 x 80 CLAY ART - Moss GCA04 Matt & Illus
Homogenius tile 60 x 120 CLAY ART - Slate GCA05 Matt & Illu
Homogenius tile 15 x 60 CLAY ART - Magnolia GGW01 Matt & I
Homogenius tile 15 x 90 CLAY ART - Aspen GGW02 Matt & Illu

Homogenius tile 80 x 80 Paige GPS02 Matt & Illustration


Homogenius tile 80 x 80 Payton GPS04 Matt & Illustration
Homogenius tile 80 x 80 Piper GPS05 Matt & Illustration
Homogenius tile 80 x 80 Pearl GPS07 Matt & Illustration
Homogenius tile 80 x 80 Polly GPS08 Matt & Illustration
Homogenius tile 100 x 100 Pebble GPS01 Matt & Illustration
Homogenius tile 100 x 100 Paige GPS02 Matt & Illustration
Homogenius tile 100 x 100 Pansy GPS02 Matt & Illustration

Homogenius tile 100 x 100 GRAND LA - Poppy GPS11 Polish


Homogenius tile 100 x 100 GRAND LA - Phoebe GPS13 Polis
Homogenius tile 100 x 100 GRAND LA - Penny GPS14 Polish
Homogenius tile 100 x 100 GRAND LA -Paula GPS15 Polish
Homogenius tile 60 x 120 GRAND LA -Philis GPS17 Polish
Homogenius tile 60 x 120 GRAND LA -Perla GPS18 Polish
Homogenius tile 60 x 120 GRAND LA -Pixy GPS20 Polish
Homogenius tile 60 x 120 GRAND LA -Peggy GPS12 Polish
Homogenius tile 30 x 60 GRAND LA -Borgogna White GIP01 P
Homogenius tile 60 x 60 GRAND LA -Java Crema GIP01 Polis

Homogenius tile 45 x 90 I'PIETRA - Beola Grey GIP03 Matt


Homogenius tile 80 x 80 MATT- Limestone Beige* GIP06 Matt
Homogenius tile 60 x 120 MATT- Riviera Black GIP07 Matt
Homogenius tile 30 x 60 MATT- Borgogna White GIP01 Matt
Homogenius tile 60 x 60 MATT- Java Crema GIP02 Matt
Homogenius tile 45 x 90 I'PIETRA - Beola Grey GIP03 Matt

Homogenius tile 80 x 80 LAPPATO - Alpine Grey GIP04 Lappa


Homogenius tile 60 x 120 LAPPATO - Limestone Beige* GIP0
Homogenius tile 30 x 60 LAPPATO - Beola Grey GIP03 Lappa
Homogenius tile 60 x 60 I'PIETRA - Alpine Grey GIP03 Lappat

Homogenius tile 80 x 80 STRUCTURED - Structured


Homogenius tile 60 x 120 STRUCTURED - Structured

Homogenius tile 60 x 60 LUCIDO - Abree GMA33 Polished


Homogenius tile 80 x 80 LUCIDO - Abree GMA33 Polished
Homogenius tile 80 x 80 LUCIDO - Milky GBR01 Nano

Homogenius tile 60 x 60 MARBRE - Blanc GMA25 Polished


Homogenius tile 80 x 80 MARBRE - Blanc GMA25 Polished

Homogenius tile 60 x 60 MEGALITO - Cameo White GML01 S

Homogenius tile 60 x 120 MURALE- Opal Grey GML02 Matt


Homogenius tile 60 x 60 MURALE- Cameo White GML01 Mat

Homogenius tile 60 x 120 MURALE- Opal Grey GML02 Struct


Homogenius tile 60 x 60 MURALE- Hazel GMU01 Structured

Homogenius tile 60 x 60 MURALE- Calcite GNT01 Structured


Homogenius tile 30 x 60 MURALE-Celestine GNT02 Structure

Homogenius tile 60 x 60 NIKTO-Calcite GNT01 Matt


Homogenius tile 30 x 60 NIKTO-Celestine GNT02 Matt

Homogenius tile 60 x 60 POLAR BLACK-Fog GPB01 Matt


Homogenius tile 30 x 60 POLAR BLACK-Cobble Stone GPB02

Homogenius tile 60 x 60 POLAR BLACK-Light Grey GMR81 S

Homogenius tile 15 x 60 REGAL Legna Bianco GDW01 Struct


Homogenius tile 15 x 90 REGAL Legno Beigo GDW01 Structu

Homogenius tile 20 x 120 SOFT WOOD-Marrone Legno GDW


Homogenius tile 60 x 60 SOFT WOOD-Kawung Cakra Ningrat
Homogenius tile 60 x 60 SOFT WOOD-Kawung Cakra Ningrat
Homogenius tile 60 x 60 SOFT WOOD-Mandala Cakra Ningra
Homogenius tile 60 x 60 SOFT WOOD-Mandala Cakra Ningrat
Homogenius tile 60 x 60 SOFT WOOD-Kupu Kawung 01 D00
Homogenius tile 60 x 60 SWATANTRA -Kupu Kawung 02 D00
Homogenius tile 60 x 60 SWATANTRA -Sawunggaling Tarung 0
Homogenius tile 60 x 60 SWATANTRA -Sawunggaling Tarung 0
Homogenius tile 60 x 60 SWATANTRA -Kawung Cakra Ningrat
Homogenius tile 60 x 60 SWATANTRA -Mandala Cakra Ningrat
Homogenius tile 60 x 60 SWATANTRA -Kupu Kawung 03 D00
Homogenius tile 60 x 60 SWATANTRA -Sawunggaling Tarung 0

Homogenius tile 60 x 60 TECTURA - Grigio Mist D0052 Strucu


Homogenius tile 60 x 60 TERRAZZO - Terrazzo Alba GTZ01 M
Homogenius tile 60 x 120 TERRAZZO - Terrazzo Brunneis GT

Homogenius tile 60 x 120 TRAVERTINE MARBLE - Latte GTM


Homogenius tile 60 x 60 TRAVERTINE MARBLE - Linen GTX
Homogenius tile 60 x 120 TRAVERTINE MARBLE - Linen GT
Homogenius tile 30 x 60 VEINSTONE MATT
- Beige GSV01
Homogenius tile Matt
60 x 60 VEINSTONE MATT
- Brown GSV02 Matt

Homogenius tile 30 x 60 VEINSTONE LAPPATO - Beige GSV01


Homogenius tile 60 x 60 VEINSTONE LAPPATO - Brown GSV0

Homogenius tile 30 x 60 WAVE - White GWV01 Matt


Homogenius tile 60 x 60 WAVE - Grey GWV01 Matt

Homogenius tile 60 x 60 WENGE - White GMA61 Polished


Homogenius tile 60 x 60 WENGE - Beige GMA62 Polished
Homogenius tile 60 x 60 WENGE - Grey GMA613 Polished
Homogenius tile 40 x 80 WENGE - Beige GMA62 Nano
Homogenius tile 40 x 80 WENGE - Grey GMA63 Nano

Homogenius tile 30 x 60 YURA - Snow GMY01 Matt


Homogenius tile 60 x 60 YURA - Foggy GMY03 Matt
Homogenius tile 60 x 60 YURA - Tobacco GMY04 Matt
Homogenius tile 60 x 60 YURA - Lead Grey GMY06 Matt

Homogenius tile 80 x 80 FIORE - Azalea GFO 01 PGVT


Homogenius tile 80 x 80 FIORE - Camomile GFO 02 PGVT
Homogenius tile 80 x 80 FIORE - Dahlia GFO 03 PGVT
Homogenius tile 80 x 80 FIORE - Fresia GFO 04 PGVT
Homogenius tile 80 x 80 FIORE - Lavanda GFO 05 PGVT

Homogenius tile 80 x 80 LUX 2.0 - Celesta GXP 34 Soft Poli


Homogenius tile 80 x 80 LUX 2.0 - Tuba GXP 47 Soft Polished
Homogenius tile 80 x 80 LUX 2.0 - Farsa GXP 58 Soft Polish

Homogenius tile 80 x 80 HAVANA - Crema GHV 03 Double Lo


Homogenius tile 80 x 80 HAVANA - Cinza GHV 07 Double Lo
Homogenius tile 80 x 80 HAVANA - Morenzo GHV 08 Double

Homogenius tile 80 x 80 MARBLEVO - Presto GME 05 Digital


Homogenius tile 80 x 80 MARBLEVO - Mezzo GME 10 Digital
Homogenius tile 80 x 80 MARBLEVO - Spinto GME 57 Digital
Homogenius tile 80 x 80 MARBLEVO - Piccolo GME 59 Digita
Homogenius tile 80 x 80 MARBLEVO - Concerto GME 67 Digi

Homogenius tile 80 x 80 FLEUR- Fleur GFL 01 PGVT


Homogenius tile 80 x 80 FLEUR- Dandelion GFL 02 PGVT
Homogenius tile 80 x 80 FLEUR- Marigold GFL 013 PGVT
Homogenius tile 80 x 80 FLEUR- Orchid GFL 014 PGVT

Homogenius tile 60 x 60 LUX 2.0 - Aria GXP 19 PGVT


Homogenius tile 60 x 60 LUX 2.0 - Viola GXP 39 PGVT
Homogenius tile 80 x 80 LUX 2.0 - Aria GXP 19 PGVT
Homogenius tile 80 x 80 LUX 2.0 - Viola GXP 39 PGVT
Homogenius tile 80 x 80 LUX 2.0 - Dolce GXP 30 PGVT
Homogenius tile 80 x 80 LUX 2.0 - Vivace GXP 63 PGVT
Homogenius tile 80 x 80 LUX 2.0 - Diva GXP 76 PGVT

Homogenius tile 30 x 60 H5 - White PH501 Matt


Homogenius tile 60 x 60 H5 - Beige PH502 Matt
Homogenius tile 60 x 60 H5 - Grey PH503 Matt
Homogenius tile 60 x 60 H5 - Graphite PH504 Matt

Homogenius tile 30 x 60 B5 - White PB501 Matt


Homogenius tile 60 x 60 B5 - Beige PB502 Matt
Homogenius tile 60 x 60 B5 - Grey PB503 Matt
Homogenius tile 60 x 60 B5 - Graphite PB504 Matt

Homogenius tile 30 x 60 B5 - White PB501 Structured


Homogenius tile 60 x 60 B5 - Beige PB502 Structured
Homogenius tile 60 x 60 B5 - Grey PB503 Structured
Homogenius tile 60 x 60 B5 - Graphite PB504 Structured

Homogenius tile 30 x 60 I5 - White PI501 Matt


Homogenius tile 60 x 60 I5 - Beige PI502 Matt
Homogenius tile 60 x 60 I5 - Grey PI503 Matt
Homogenius tile 60 x 60 I5 - Graphite PI504 Matt

Homogenius tile 30 x 60 Y6 - Beige PY602 Matt


Homogenius tile 15 x 60 Y6 - Oak PY603 Matt
Homogenius tile 15 x 60 Y6 - Marrone PY6034 Matt
Homogenius tile 15 x 60 Y6 - Dark Oak PY605 Matt
Homogenius tile 15 x 60 Y6 - Grey PY606 Matt

Homogenius tile 30 x 60 R7 - Vanilla PR701 Matt


Homogenius tile 30 x 60 R7 - Cinnamon PR702 Matt
Homogenius tile 30 x 60 R7 - Espresso PR702 Matt

Homogenius tile 30 x 60 HARDROCK - Dove GHR01 Matt


Homogenius tile 60 x 60 HARDROCK - Oasis GHR02 Matt
Homogenius tile 60 x 60 HARDROCK -Drizzle GHR03 Matt
Homogenius tile 60 x 60 HARDROCK -Moss GHR04 Matt
Homogenius tile 60 x 60 HARDROCK -Sparrow GHR05 Matt
Homogenius tile 60 x 60 HARDROCK -Hawk GHR06 Matt

Homogenius tile 30 x 60 HARDROCK - Dove GHR01 Structu


Homogenius tile 60 x 60 HARDROCK - Oasis GHR02 Structu
Homogenius tile 60 x 60 HARDROCK -Drizzle GHR03Structu
Homogenius tile 60 x 60 HARDROCK -Moss GHR04 Structur
Homogenius tile 60 x 60 HARDROCK -Sparrow GHR05 Struct
Homogenius tile 60 x 60 HARDROCK -Hawk GHR06 Structure

Homogenius tile 30 x 60 HARDROCK - Dove GHR01 Lapatto


Homogenius tile 60 x 60 HARDROCK - Oasis GHR02 Lapatto
Homogenius tile 60 x 60 HARDROCK -Drizzle GHR03 Lapatt
Homogenius tile 60 x 60 HARDROCK -Moss GHR04 Lapatto
Homogenius tile 60 x 60 HARDROCK -Sparrow GHR05 Lapatt
Homogenius tile 60 x 60 HARDROCK -Hawk GHR06 Lapatto

Homogenius tile 30 x 60 ROCKWOOD - Weathered Grey GR


Homogenius tile 60 x 60 ROCKWOODK - Cedar GRW02 Matt
Homogenius tile 60 x 60 ROCKWOOD - Mint Grey GRW03 Ma
Homogenius tile 60 x 60 ROCKWOOD - Wedgewood GRW04
Homogenius tile 60 x 60 ROCKWOOD - Iron Grey GRW05 Ma

Homogenius tile 30 x 60 ROCKWOOD - Weathered Grey GR


Homogenius tile 60 x 60 ROCKWOOD - Cedar GRW02 Lapatt
Homogenius tile 60 x 60 ROCKWOOD - Mint Grey GRW03 Lap
Homogenius tile 60 x 60 ROCKWOOD - Wedgewood GRW04
Homogenius tile 60 x 60 ROCKWOOD - Iron Grey GRW05 La

Homogenius tile 30 x 60 SOAPROCK- Oslo GSP01 Matt


Homogenius tile 60 x 60 SOAPROCK - Bode GSP02 Matt
Homogenius tile 60 x 60 SOAPROCK - Randers GSP03 Matt
Homogenius tile 60 x 60 SOAPROCK - Flen GSP04 Matt
Homogenius tile 60 x 60 SOAPROCK - Solna GSP05 Matt

Homogenius tile 30 x 60 SOAPROCK- Oslo GSP01 Lapatto


Homogenius tile 60 x 60 SOAPROCK - Bode GSP02 Lapatto
Homogenius tile 60 x 60 SOAPROCK - Randers GSP03 Lapa
Homogenius tile 60 x 60 SOAPROCK - Flen GSP04 Lapatto
Homogenius tile 60 x 60 SOAPROCK - Solna GSP05 Lapatto

Homogenius tile 30 x 60 ZEOLITE*- Mist GZL01 Matt


Homogenius tile 60 x 60 ZEOLITE* - Cinder GZL02 Matt
Homogenius tile 60 x 60 ZEOLITE* - Glacier GZL03 Matt
Homogenius tile 60 x 60 ZEOLITE* - Fog GZL04 Matt

Homogenius tile 60 x 60 NATUROC - Stark Beige GNC01 Stru


Homogenius tile 60 x 60 NATUROC - Sandy CrèmeGNC02 Str
Homogenius tile 60 x 60 NATUROC - Smoky GreyGNC03 Stru
Homogenius tile 60 x 60 NATUROC - Gravel Gray GNC04 Str

Homogenius tile 60 x 60 CRISTALLO - Faye GN542 Polished


Homogenius tile 60 x 60 CRISTALLO - White Crystal GG605
Homogenius tile 60 x 60 CRISTALLO - White Latte GG625 P
Homogenius tile 60 x 60 CRISTALLO - Janette GN707 Polish

Homogenius tile 60 x 60 ELEGANCE- Carolina GMA02 Polis


Homogenius tile 60 x 60 ELEGANCE- Antique white GMA26 P
Homogenius tile 60 x 60 ELEGANCE-Black ink GMA28 Polis
Homogenius tile 60 x 60 ELEGANCE- Lacy GMA58 Polished
Homogenius tile 80 x 80 ELEGANCE- Antique white GMA26 P

Homogenius tile 60 x 60 ESTILO- Elda GEA00 Polished Nano


Homogenius tile 60 x 60 ESTILO- GG901 Polished Nano
Homogenius tile 60 x 60 ESTILO- Ambra GEA03 Polished Nan
Homogenius tile 60 x 60 ESTILO- Carla GEA05 Polished Nan
Homogenius tile 60 x 60 ESTILO- Mia GEA13 Polished Nano
Homogenius tile 60 x 60 ESTILO- Emma GEA16 Polished Nan
Homogenius tile 60 x 60 ESTILO-Sofia GEA25 Polished Nano
Homogenius tile 60 x 60 ESTILO- Celia GEB01 Polished Nano
Homogenius tile 60 x 60 ESTILO- Ines GEB01 Polished Nano
Homogenius tile 60 x 60 ESTILO- White Swan Polished Nano
Homogenius tile 80 x 80 ESTILO- Celia GEB01 Polished Nano
Homogenius tile 80 x 80 ESTILO- Ines GED00 Polished Nano

Homogenius tile 30 x 60 SPLASH- White GG210 Matt


Homogenius tile 60 x 60 SPLASH - Beige GG042 Matt
Homogenius tile 60 x 60 SPLASH -Grey GG041 Matt
Homogenius tile 60 x 60 SPLASH - Black GG040 Matt

Homogenius tile 60 x 60 WOOD STONE -Natural GWD01 Pol


Homogenius tile 60 x 60 WOOD STONE - Blonde GWD02 Pol
: BANYUWANGI

Harga PRICE LIST


Merk Satuan
(Rp.)

NIRO m2(2/dos) 692,000 547,000


NIRO m2(3/dos) 297,000 234,875
NIRO m2(2/dos) 393,000 310,500
-
NIRO m2(3/dos) 297,000 234,875
NIRO m2(2/dos) 393,000 310,500
NIRO m2(6/dos) 416,000 328,500
-
NIRO m2(3/dos) 416,000 328,500
NIRO m2(6/dos) 277,000 219,250
NIRO m2(6/dos) 277,000 219,250
-
NIRO m2(2/dos) 378,000 298,625
NIRO m2(6/dos) 277,000 219,250
-
NIRO m2(3/dos) 277,000 219,250
NIRO m2(2/dos) 378,000 298,625
NIRO m2(6/dos) 250,000 197,375
NIRO m2(3/dos) 250,000 197,375
-
NIRO m2(3/dos) 298,000 235,500
NIRO m2(2/dos) 298,000 235,500
NIRO m2(2/dos) 345,000 272,375
NIRO m2(12/dos) 416,000 328,500
NIRO m2(8/dos) 466,000 368,500
-
NIRO m2(3/dos) 434,000 343,000
NIRO m2(3/dos) 522,000 412,500
NIRO m2(3/dos) 434,000 343,000
NIRO m2(3/dos) 522,000 412,500
NIRO m2(3/dos) 522,000 412,500
NIRO m2(2/dos) 607,000 479,500
NIRO m2(2/dos) 607,000 479,500
NIRO m2(2/dos) 607,000 479,500
-
NIRO m2(2/dos) 655,000 517,750
NIRO m2(2/dos) 603,000 477,000
NIRO m2(2/dos) 607,000 479,500
NIRO m2(2/dos) 607,000 479,500
NIRO m2(2/dos) 653,000 516,250
NIRO m2(2/dos) 653,000 516,250
NIRO m2(2/dos) 611,000 483,000
NIRO m2(2/dos) 611,000 483,000
NIRO m2(6/dos) 428,000 338,000
NIRO m2(3/dos) 428,000 338,000
-
NIRO m2(3/dos) 478,000 378,000
NIRO m2(3/dos) 516,000 408,000
NIRO m2(2/dos) 605,000 478,000
NIRO m2(6/dos) 491,000 388,000
NIRO m2(3/dos) 491,000 388,000
NIRO m2(3/dos) 516,000 408,000
-
NIRO m2(3/dos) 567,000 448,000
NIRO m2(2/dos) 643,000 508,000
NIRO m2(6/dos) 428,000 338,000
NIRO m2(3/dos) 428,000 338,000
-
NIRO m2(3/dos) 516,000 408,000
NIRO m2(2/dos) 605,000 478,000
-
NIRO m2(3/dos) 472,000 373,000
NIRO m2(3/dos) 523,000 413,500
NIRO m2(3/dos) 655,000 518,000
-
NIRO m2(3/dos) 496,000 392,000
NIRO m2(3/dos) 622,000 492,000
-
NIRO m2(3/dos) 401,000 316,750
-
NIRO m2(2/dos) 448,000 354,250
NIRO m2(3/dos) 401,000 316,750
-
NIRO m2(2/dos) 448,000 354,125
NIRO m2(3/dos) 261,000 206,000
-
NIRO m2(3/dos) 428,000 338,500
NIRO m2(6/dos) 428,000 338,500
-
NIRO m2(3/dos) 491,000 388,500
NIRO m2(6/dos) 491,000 388,500
-
NIRO m2(3/dos) 491,000 388,500
NIRO m2(6/dos) 491,000 388,500
-
NIRO m2(3/dos) 479,000 378,500
-
NIRO m2(12/dos) 415,000 328,000
NIRO m2(8/dos) 466,000 368,000
-
NIRO m2(6/dos) 579,000 458,000
NIRO m2(3/dos) 402,000 317,500
NIRO m2(3/dos) 394,000 311,500
NIRO m2(3/dos) 394,000 311,500
NIRO m2(3/dos) 394,000 311,500
NIRO m2(3/dos) 394,000 311,500
NIRO m2(3/dos) 394,000 311,500
NIRO m2(3/dos) 394,000 311,500
NIRO m2(3/dos) 394,000 311,500
NIRO m2(3/dos) 394,000 311,500
NIRO m2(3/dos) 394,000 311,500
NIRO m2(3/dos) 394,000 311,500
NIRO m2(3/dos) 394,000 311,500
-
NIRO m2(3/dos) 337,000 266,750
NIRO m2(3/dos) 297,000 234875
NIRO m2(2/dos) 392,000 309875
-
NIRO m2(3/dos) 947,000 748,500
NIRO m2(3/dos) 475,000 375,500
NIRO m2(2/dos) 942,000 745,000
-
NIRO m2(6/dos) 416,000 328,500
NIRO m2(3/dos) 416,000 328,500
-
NIRO m2(6/dos) 441,000 348,500
NIRO m2(3/dos) 441,000 348,500
-
NIRO m2(6/dos) 466,000 368500
NIRO m2(3/dos) 466,000 368500
-
NIRO m2(3/dos) 460,000 363,500
NIRO m2(3/dos) 460,000 363,500
NIRO m2(3/dos) 460,000 363,500
NIRO m2(4/dos) 530,000 419,000
NIRO m2(4/dos) 530,000 419,000
-
NIRO m2(6/dos) 403,000 318,500
NIRO m2(3/dos) 403,000 318,500
NIRO m2(3/dos) 403,000 318,500
NIRO m2(3/dos) 403,000 318,500
-
NIRO m2(3/dos) 377,000 298,000
NIRO m2(3/dos) 377,000 298,000
NIRO m2(3/dos) 377,000 298,000
NIRO m2(3/dos) 377,000 298,000
NIRO m2(3/dos) 377,000 298,000
-
NIRO m2(3/dos) 424,000 335,250
NIRO m2(3/dos) 424,000 335,250
NIRO m2(3/dos) 424,000 335,250
-
NIRO m2(3/dos) 427,000 337,250
NIRO m2(3/dos) 427,000 337,250
NIRO m2(3/dos) 427,000 337,250
-
NIRO m2(3/dos) 592,000 468,000
NIRO m2(3/dos) 592,000 468,000
NIRO m2(3/dos) 592,000 468,000
NIRO m2(3/dos) 592,000 468,000
NIRO m2(3/dos) 592,000 468,000
-
NIRO m2(3/dos) 311,000 246,000
NIRO m2(3/dos) 311,000 246,000
NIRO m2(3/dos) 311,000 246,000
NIRO m2(3/dos) 311,000 246,000
-
NIRO m2(4/dos) 245,000 194,000
NIRO m2(4/dos) 245,000 194,000
NIRO m2(3/dos) 309,000 244,250
NIRO m2(3/dos) 309,000 244,250
NIRO m2(3/dos) 324,000 255,750
NIRO m2(3/dos) 324,000 255,750
NIRO m2(3/dos) 324,000 255,750
-
NIRO m2(8/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
-
NIRO m2(8/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
-
NIRO m2(8/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
-
NIRO m2(8/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
NIRO m2(4/dos) 259,000 205,000
-
NIRO m2(8/dos) 264,000 209,000
NIRO m2(3/dos) 283,000 224,000
NIRO m2(3/dos) 283,000 224,000
NIRO m2(3/dos) 283,000 224,000
NIRO m2(3/dos) 283,000 224,000
-
NIRO m2(3/dos) 264,000 209,000
NIRO m2(3/dos) 264,000 209,000
NIRO m2(3/dos) 264,000 209,000
-
NIRO m2(6/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
-
NIRO m2(6/dos) 206,000 162,500
NIRO m2(3/dos) 206,000 162,500
NIRO m2(3/dos) 206,000 162,500
NIRO m2(3/dos) 206,000 162,500
NIRO m2(3/dos) 206,000 162,500
NIRO m2(3/dos) 206,000 162,500
-
NIRO m2(6/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
-
NIRO m2(6/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
-
NIRO m2(6/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
-
NIRO m2(6/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
-
NIRO m2(6/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
NIRO m2(3/dos) 314,000 248,500
-
NIRO m2(6/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
NIRO m2(3/dos) 269,000 213,000
-
NIRO m2(3/dos) 258,000 203,625
NIRO m2(3/dos) 258,000 203,625
NIRO m2(3/dos) 258,000 203,625
NIRO m2(3/dos) 258,000 203,625
-
NIRO m2(3/dos) 253,000 200,000
NIRO m2(3/dos) 291,000 230,000
NIRO m2(3/dos) 240,000 190,000
NIRO m2(3/dos) 304,000 240,000
-
NIRO m2(3/dos) 292,000 231,000
NIRO m2(3/dos) 355,000 281,000
NIRO m2(3/dos) 355,000 280,500
NIRO m2(4/dos) 249,000 196,500
NIRO m2(3/dos) 416,000 328,500
-
NIRO m2(4/dos) 244,000 192,500
NIRO m2(4/dos) 221,000 175,000
NIRO m2(4/dos) 242,000 191,000
NIRO m2(4/dos) 242,000 191,000
NIRO m2(4/dos) 250,000 197,500
NIRO m2(4/dos) 250,000 197,500
NIRO m2(4/dos) 250,000 197,500
NIRO m2(4/dos) 261,000 206,000
NIRO m2(4/dos) 287,000 227,000
NIRO m2(4/dos) 221,000 175,000
NIRO m2(3/dos) 275,000 217,500
NIRO m2(3/dos) 343,000 271,500
-
NIRO m2(6/dos) 194,000 153,625
NIRO m2(3/dos) 194,000 153,625
NIRO m2(3/dos) 375,000 296,500
NIRO m2(3/dos) 375,000 296,500
-
NIRO m2(4/dos) 267,000 211,000
NIRO m2(4/dos) 267,000 211,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
PRICE LIST + 15% pajak
- 0 1 1

492,300 629,050 691,955 692,000


211,388 270,106 297,117 297,000
279,450 357,075 392,783 393,000
-
211,388 270,106 297,117 297,000
279,450 357,075 392,783 393,000
295,650 377,775 415,553 416,000
- - -
295,650 377,775 415,553 416,000
197,325 252,138 277,351 277,000
197,325 252,138 277,351 277,000
- - -
268,763 343,419 377,761 378,000
197,325 252,138 277,351 277,000
- - -
197,325 252,138 277,351 277,000
268,763 343,419 377,761 378,000
177,638 226,981 249,679 250,000
177,638 226,981 249,679 250,000
- - -
211,950 270,825 297,908 298,000
211,950 270,825 297,908 298,000
245,138 313,231 344,554 345,000
295,650 377,775 415,553 416,000
331,650 423,775 466,153 466,000
- - -
308,700 394,450 433,895 434,000
371,250 474,375 521,813 522,000
308,700 394,450 433,895 434,000
371,250 474,375 521,813 522,000
371,250 474,375 521,813 522,000
431,550 551,425 606,568 607,000
431,550 551,425 606,568 607,000
431,550 551,425 606,568 607,000
- - -
465,975 595,413 654,954 655,000
429,300 548,550 603,405 603,000
431,550 551,425 606,568 607,000
431,550 551,425 606,568 607,000
464,625 593,688 653,056 653,000
464,625 593,688 653,056 653,000
434,700 555,450 610,995 611,000
434,700 555,450 610,995 611,000
304,200 388,700 427,570 428,000
304,200 388,700 427,570 428,000
- - -
340,200 434,700 478,170 478,000
367,200 469,200 516,120 516,000
430,200 549,700 604,670 605,000
349,200 446,200 490,820 491,000
349,200 446,200 490,820 491,000
367,200 469,200 516,120 516,000
- - -
403,200 515,200 566,720 567,000
457,200 584,200 642,620 643,000
304,200 388,700 427,570 428,000
304,200 388,700 427,570 428,000
- - -
367,200 469,200 516,120 516,000
430,200 549,700 604,670 605,000
- - -
335,700 428,950 471,845 472,000
372,150 475,525 523,078 523,000
466,200 595,700 655,270 655,000
- - -
352,800 450,800 495,880 496,000
442,800 565,800 622,380 622,000
- - -
285,075 364,263 400,689 401,000
- - -
318,825 407,388 448,126 448,000
316,750 364,263 400,689 401,000
- - -
318,713 407,244 447,968 448,000
185,400 236,900 260,590 261,000
- - -
389,275 428,203 428,000
389,275 428,203 428,000
- - -
446,775 491,453 491,000
446,775 491,453 491,000
- - -
446,775 491,453 491,000
446,775 491,453 491,000
- - -
435,275 478,803 479,000
- - -
377,200 414,920 415,000
423,200 465,520 466,000
- - -
526,700 579,370 579,000
365,125 401,638 402,000
358,225 394,048 394,000
358,225 394,048 394,000
358,225 394,048 394,000
358,225 394,048 394,000
358,225 394,048 394,000
358,225 394,048 394,000
358,225 394,048 394,000
358,225 394,048 394,000
358,225 394,048 394,000
358,225 394,048 394,000
358,225 394,048 394,000
- - -
306,763 337,439 337,000
270,106 297,117 297,000
356,356 391,992 392,000
-
860,775 946,853 947,000
431,825 475,008 475,000
856,750 942,425 942,000
- - -
377,775 415,553 416,000
377,775 415,553 416,000
- - -
400,775 440,853 441,000
400,775 440,853 441,000
- - -
423,775 466,153 466,000
423,775 466,153 466,000
- - -
418,025 459,828 460,000
418,025 459,828 460,000
418,025 459,828 460,000
481,850 530,035 530,000
481,850 530,035 530,000
- - -
366,275 402,903 403,000
366,275 402,903 403,000
366,275 402,903 403,000
366,275 402,903 403,000
- - -
342,700 376,970 377,000
342,700 376,970 377,000
342,700 376,970 377,000
342,700 376,970 377,000
342,700 376,970 377,000
-
385,538 424,091 424,000
385,538 424,091 424,000
385,538 424,091 424,000
-
387,838 426,621 427,000
387,838 426,621 427,000
387,838 426,621 427,000
-
538,200 592,020 592,000
538,200 592,020 592,000
538,200 592,020 592,000
538,200 592,020 592,000
538,200 592,020 592,000
-
282,900 311,190 311,000
282,900 311,190 311,000
282,900 311,190 311,000
282,900 311,190 311,000
-
223,100 245,410 245,000
223,100 245,410 245,000
280,888 308,976 309,000
280,888 308,976 309,000
294,113 323,524 324,000
294,113 323,524 324,000
294,113 323,524 324,000
-
235,750 259,325 259,000
235,750 259,325 259,000
235,750 259,325 259,000
235,750 259,325 259,000
-
235,750 259,325 259,000
235,750 259,325 259,000
235,750 259,325 259,000
235,750 259,325 259,000
-
235,750 259,325 259,000
235,750 259,325 259,000
235,750 259,325 259,000
235,750 259,325 259,000
-
235,750 259,325 259,000
235,750 259,325 259,000
235,750 259,325 259,000
235,750 259,325 259,000
-
240,350 264,385 264,000
257,600 283,360 283,000
257,600 283,360 283,000
257,600 283,360 283,000
257,600 283,360 283,000
-
240,350 264,385 264,000
240,350 264,385 264,000
240,350 264,385 264,000
-
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
-
186,875 205,563 206,000
186,875 205,563 206,000
186,875 205,563 206,000
186,875 205,563 206,000
186,875 205,563 206,000
186,875 205,563 206,000
-
285,775 314,353 314,000
285,775 314,353 314,000
285,775 314,353 314,000
285,775 314,353 314,000
285,775 314,353 314,000
285,775 314,353 314,000
- - -
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
-
285,775 314,353 314,000
285,775 314,353 314,000
285,775 314,353 314,000
285,775 314,353 314,000
285,775 314,353 314,000
-
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
- - -
285,775 314,353 314,000
285,775 314,353 314,000
285,775 314,353 314,000
285,775 314,353 314,000
285,775 314,353 314,000
-
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
244,950 269,445 269,000
- - -
234,169 257,586 258,000
234,169 257,586 258,000
234,169 257,586 258,000
234,169 257,586 258,000
- - -
230,000 253,000 253,000
264,500 290,950 291,000
218,500 240,350 240,000
276,000 303,600 304,000
- - -
265,650 292,215 292,000
323,150 355,465 355,000
322,575 354,833 355,000
225,975 248,573 249,000
377,775 415,553 416,000
- - -
221,375 243,513 244,000
201,250 221,375 221,000
219,650 241,615 242,000
219,650 241,615 242,000
227,125 249,838 250,000
227,125 249,838 250,000
227,125 249,838 250,000
236,900 260,590 261,000
261,050 287,155 287,000
201,250 221,375 221,000
250,125 275,138 275,000
312,225 343,448 343,000
- - -
176,669 194,336 194,000
176,669 194,336 194,000
340,975 375,073 375,000
340,975 375,073 375,000
- - -
242,650 266,915 267,000
242,650 266,915 267,000
- - -
- - -
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk Satuan

BAHAN TEMPEL LANTAI DAN DINDING


1 Tegel Badag Merah 30/30 m2
2 Tegel Badag Hitam 30/30 m2
3 Tegel PC abu-abu 20 x 20 cm m2
4 Keramik 10 x 20 cm motif m2
5 Keramik 10 x 20 cm polos m2
6 Keramik 20 x 20 cm motif Asia tile (welco blue) dos
7 Keramik 20 x 20 cm polos Asia tile (alpha black) dos
8 Keramik 20 x 25 cm motif Asia tile (galery D.pink) dos
9 Keramik 20 x 25 cm polos Asia tile dos
10 Keramik 30 x 30 cm motif Asia tile (Jugle cream) dos
11 Keramik 30 x 30 cm polos Asia tile (Oscar black) dos
12 Keramik 40 x 40 cm motif Asia tile dos
13 Keramik 40 x 40 cm polos Asia tile (Murano) dos
14 Keramik 25 x 40 Asia tile (Zulu grey) dos
15 Keramik 50 x 50 Milan (Alexa beige) dos
20 Homogeneus tile 30 x 60 Granito dos
21 Homogeneus tile 40 x 80 polished Granito ( pearl white ) dos
22 Homogeneus tile 40 x 80 un polished Granito, Niro granit, Indogress dos
23 Homogeneus tile 60 x 60 polished China Kw ( happy hous) dos
24 Homogeneus tile 60 x 60 polished Indogress (zirconium) dos
25 Homogeneus tile 60 x 60 un polished Granito (stone black) dos
26 Homogeneus tile 60 x 60 motif batik Indogress (hollano) dos
27 Homogeneus tile 80 x 80 polished Granito (pearl white) dos
28 Homogeneus tile 80 x 80 un polished Granito (fort white) dos

A - Keramik 30 x 30 warna putih MULIA m2


- Keramik 20 x 20 warna muda MULIA m2
- Keramik 30 x 30 warna marble MULIA m2
- Keramik 20 x 20 warna tua MULIA m2
- Keramik 30 x 30 warna impresso MULIA m2

B - Keramik 30 x 30 warna putih ARWANA m2


- Keramik 20 x 20 warna muda ARWANA m2
- Keramik 30 x 30 warna marble ARWANA m2
- Keramik 20 x 20 warna tua ARWANA m2
- Keramik 40 x 40 warna putih ARWANA m2
- Keramik 40 x 40 warna marbe ARWANA m2
- Keramik 30 x 30 warna fancy ARWANA m2

C - Keramik 40 x 40 warna putih HERCULES m2


- Keramik 40 x 40 warna gelap HERCULES m2
- Keramik 40 x 40 warna motif khusus HERCULES m2
- Keramik 40 x 40 warna motif dasar putih HERCULES m2
- Keramik 40 x 40 warna motif dasar gelap HERCULES m2

D - Keramik 20 x 20 ROMAN GOL. A m2(25/dos)


- Keramik 40 x 40 ROMAN GOL. A m2(6/dos)
- Keramik 33.3 x 33.3 ROMAN GOL. A m2(9/dos)
- Keramik 45 x 45 ROMAN GOL. A m2(5/dos)
- Keramik 50 x 50 ROMAN GOL. A m2(4/dos)
- Keramik 60 x 60 ROMAN GOL. A m2(3/dos)
- Keramik 33.3 x 66.6 ROMAN GOL. A m2(5/dos)
- Keramik 16.5 x 66.6 ROMAN GOL. A m2(10/dos)
- Step Nosing 10 x 30 ROMAN GOL. A m2(33/dos)

- Keramik 30 x 30 ROMAN GOL. B m2(11/dos)


- Keramik 20 x 20 ROMAN GOL. B m2(25/dos)
- Keramik 40 x 40 ROMAN GOL. B m2(6/dos)
- Keramik 45 x 45 ROMAN GOL. B m2(5/dos)
- Keramik 50 x 50 ROMAN GOL. B m2(4/dos)
- Keramik 60 x 60 ROMAN GOL. B m2(3/dos)
- Keramik 33.3 x 66.6 ROMAN GOL. B m2(5/dos)

- Keramik 30 x 30 ROMAN GOL. C m2(11/dos)


- Keramik 33.3 x 33.3 ROMAN GOL. C m2(9/dos)
- Keramik 50 x 50 ROMAN GOL. C m2(4/dos)
- Keramik 60 x 60 ROMAN GOL. C m2(3/dos)
- Keramik 33.3 x 66.6 ROMAN GOL. C m2(5/dos)
- Keramik 40 x 40 ROMAN GOL. C m2(6/dos)
- Keramik 20 x 20 ROMAN GOL. C m2(20/dos)
- Keramik 40 x 40 ROMAN GOL. C m2(6/dos)
- Keramik 45 x 45 ROMAN GOL. C m2(5/dos)
- Hospital Skirting 8 x 30 ROMAN GOL. C m2(30/dos)
- Step Nosing 10 x 20 ROMAN GOL. C m2(50/dos)

E - Keramik 50 x 50 pure color MILAN m2


- Keramik 50 x 50 classy color MILAN m2
- Keramik 50 x 50 fancy color MILAN m2
- Keramik 50 x 50 accent color MILAN m2
- Keramik 25 x 50 pure color MILAN m2
- Keramik 25 x 50 classy color MILAN m2
- Keramik 25 x 50 fancy color MILAN m2
- Keramik 25 x 50 accent color MILAN m2
- Keramik 25 x 25 pure color MILAN m2
- Keramik 25 x 25 classy color MILAN m2
- Keramik 25 x 25 fancy color MILAN m2
- Keramik 25 x 25 accent color MILAN m2
- Keramik 40 x 40 putih MILAN m2
- Keramik 40 x 40 median MILAN m2
- Keramik 40 x 40 gelap MILAN m2
- Keramik 33 x 33 rustic MILAN m2
- Keramik 40 x 40 rustic MILAN m2
- Keramik 25 x 33 supermilan gol. A MILAN m2
- Keramik 25 x 33 supermilan gol. B MILAN m2
- Keramik 40 x 40 supermilan putih MILAN m2
- Keramik 40 x 40 supermilan median MILAN m2
- Keramik 40 x 40 supermilan gelap MILAN m2
- Keramik 50 x 50 supermilan putih MILAN m2

F - Homogenius tile 60 x 60 Salsa pearl white GRANITO m2(3/dos)


- Homogenius tile 60 x 60 Helium GRANITO m2(3/dos)
- Homogenius tile 60 x 60 Lunar Zephyr GRANITO m2(3/dos)
- Homogenius tile 60 x 60 Luna Terra GRANITO m2(3/dos)
- Homogenius tile 60 x 60 Lunar Alumina GRANITO m2(3/dos)
- Homogenius tile 60 x 60 Lunar Alumina Steaigt GRANITO m2(3/dos)

G - Homogenius tile 60 x 60 Soap Rock Flen GSP NIRO m2(3/dos)


- Homogenius tile 60 x 60 Soap Rock Randers NIRO m2(3/dos)
- Homogenius tile 60 x 60 Yura Tobacco GMY04 NIRO m2(3/dos)
- Homogenius tile 60 x 60 Sardinia Sardo Grig NIRO m2(3/dos)
- Homogenius tile 60 x 60 Sardinia Sardo Grig NIRO m2(3/dos)
- Homogenius tile 60 x 60 Ipietra Beola Grey G NIRO m2(3/dos)
- Homogenius tile 60 x 60 Splas White GG210 NIRO m2(3/dos)
- Homogenius tile 60 x 60 Estilo Elda GEA00 N NIRO m2(3/dos)
- Homogenius tile 60 x 60 GMA28 BLACK INK NIRO m2(3/dos)
- Homogenius tile 60 x 60 GMA02 CAROLINA NIRO m2(3/dos)
- Homogenius tile 60 x 60 GN412 ALLYSSA NIRO m2(3/dos)
- Homogenius tile 60 x 60 GN417 ESTEE NIRO m2(3/dos)
- Homogenius tile 60 x 60 GG625 WHITE LATT NIRO m2(3/dos)
- Homogenius tile 60 x 60 GG605 WHITE CRY NIRO m2(3/dos)
- Homogenius tile 60 x 60 GMA26 ANTIQUE W NIRO m2(3/dos)
- Homogenius tile 80 x 80 GMA26 ANTIQUE W NIRO m2(3/dos)
- Homogenius tile 60 x 60 GMA24 WINTER WH NIRO m2(3/dos)
- Homogenius tile 60 x 60 GN762 ZENNA NIRO m2(3/dos)
- Homogenius tile 60 x 60 GN542 FAYE NIRO m2(3/dos)
- Homogenius tile 60 x 60 GN430 HELENA NIRO m2(3/dos)
- Homogenius tile 60 x 60 GN707 JANETTE NIRO m2(3/dos)
- Homogenius tile 60 x 60 GMA06 GINA NIRO m2(3/dos)
- Homogenius tile 60 x 60 GMA04 LORNA NIRO m2(3/dos)
- Homogenius tile 60 x 60 GMA27 WHITE LILY NIRO m2(3/dos)
- Homogenius tile 60 x 60 GSP01 SOAPROCK NIRO m2(3/dos)
- Homogenius tile 60 x 60 GSP02 SOAPROCK NIRO m2(3/dos)
- Homogenius tile 60 x 60 GSP03 SOAPROC NIRO m2(3/dos)
- Homogenius tile 60 x 60 GSP04 SOAPROCK NIRO m2(3/dos)
- Homogenius tile 60 x 60 GSP05 SOAPROCK NIRO m2(3/dos)
- Homogenius tile 60 x 60 GRW01 ROCK W NIRO m2(3/dos)
- Homogenius tile 60 x 60 GRW02 ROCK WO NIRO m2(3/dos)
- Homogenius tile 60 x 60 GRW03 ROCK WO NIRO m2(3/dos)
- Homogenius tile 60 x 60 GRW04 ROCK NIRO m2(3/dos)
- Homogenius tile 60 x 60 GRW05 ROCK WO NIRO m2(3/dos)
- Homogenius tile 60 x 60 GZL01 ZEOLITE MI NIRO m2(3/dos)
- Homogenius tile 60 x 60 GZL02 ZEOLITE CI NIRO m2(3/dos)
- Homogenius tile 60 x 60 GZL03 ZEOLITE GL NIRO m2(3/dos)
- Homogenius tile 60 x 60 GZL04 ZEOLITE FO NIRO m2(3/dos)
- Homogenius tile 60 x 60 BIANCA NIRO m2(3/dos)
- Homogenius tile 60 x 60 JOYCE NIRO m2(3/dos)
- Homogenius tile 60 x 60 SPLASH WHITE NIRO m2(3/dos)
- Homogenius tile 60 x 60 GEA 00 Elda NIRO m2(3/dos)
- Homogenius tile 60 x 60 GEA 03 Ambra NIRO m2(3/dos)
- Homogenius tile 60 x 60 GEA 05 Carla NIRO m2(3/dos)
- Homogenius tile 60 x 60 GEB 01 Celia NIRO m2(3/dos)
- Homogenius tile 60 x 60 GED 00 Ines NIRO m2(3/dos)
-
H Homogenius tile 60 x 60 Antica Fortuna INDOGRESS m2(4/dos)
- Homogenius tile 60 x 60 Havana (Lappato) INDOGRESS m2(4/dos)
- Homogenius tile 60 x 60 Havana (Matt) INDOGRESS m2(4/dos)
- Homogenius tile 60 x 60 Niagara (Lappato) INDOGRESS m2(4/dos)
- Homogenius tile 60 x 60 Black Sea (Lappato) INDOGRESS m2(4/dos)
- Homogenius tile 60 x 60 Niagara (Matt) INDOGRESS m2(4/dos)
- Homogenius tile 60 x 60 Niagara (Lappato) INDOGRESS m2(4/dos)

29 Kuku Macan (polos) Polos m'


Kuku Macan (ulir) Ulir m'
30 Glassblock Wave, Net, Diamond bh
31 Lantai Vinyl flooring m2
32 Lantai Vinyl plank (wood) 2 mm m2
33 Lantai Vinyl plank (wood) 3 mm m2
34 Lantai Tile carpet 3 mm m2
35 Lantai Under layer foam waterproof laminasi m2
36 Lantai Under layer soundproof m2
37 Lantai Vinyl flooring m2
38 Guidance block bh
Y HARGA BAHAN BANGUNAN

Harga
2018

50,150
50,150
39,350
72,750
67,050
52,900
52,900
60,900
54,000
51,700
48,300
66,100
49,100
67,800
66,700
449,075
507,100
-
172,500
373,700
322,000
-
603,700
-

51,300
55,500
56,700
58,500
60,300

45,200
48,300
49,500
51,300
52,500
54,900
54,900

55,300
70,900
59,900
63,100
64,500

120,800
134,600
134,600
148,500
171,400
215,200
239,500
266,600
724,000

120,800
124,900
145,800
156,900
183,900
243,000
268,000

126,300
190,900
208,900
277,700
295,000
148,500
138,800
155,500
208,200
658,200
715,100

131,200
143,000
157,600
258,200
110,300
119,400
135,300
237,400
101,300
109,700
126,300
227,000
70,100
72,200
75,600
62,400
64,200
78,400
80,500
70,100
74,900
76,300
102,000

293,500
377,200
394,400
394,400
474,100
474,100

211,000
211,000
246,300
292,600
313,000
265,900
201,300
205,500
249,900
208,200
201,300
201,300
208,200
222,100
243,000
299,900
208,200
249,900
215,200
208,200
229,100
208,200
208,200
284,600
211,000
211,000
211,000
211,000
211,000
211,000
211,000
211,000
211,000
211,000
211,000
211,000
211,000
211,000
180,500
180,500
201,300
205,500
205,500
205,500
219,400
247,100

507,100
543,300
531,300
567,500
567,500
555,400
555,400

7,100
8,300
22,600
-
264,400
385,100
385,100
-
60,300
-
-
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

Harga
No Jenis Pekerjaan Merk Satuan
2018
BAHAN PIPA
1 Pipa PVC AW 1/2 Rucika per4m 23,900
2 Pipa PVC AW 3/4 Rucika per4m 30,600
3 Pipa PVC AW 1 Rucika per4m 40,600
4 Pipa PVC AW 1 1/4 Rucika per4m 60,100
5 Pipa PVC AW 1 1/2 Rucika per4m 72,200
6 Pipa PVC AW 2 Rucika per4m 98,300
7 Pipa PVC AW 2,5 Rucika per4m 162,900
8 Pipa PVC AW 3 Rucika per4m 218,500
9 Pipa PVC AW 4 Rucika per4m 304,100
10 Pipa PVC AW 5 Rucika per4m 475,200
11 Pipa PVC AW 6 Rucika per4m 679,000
12 Pipa PVC AW 8 Rucika per4m 1,167,200
13 Pipa PVC AW 10 Rucika per4m 2,754,200
14 Pipa Galvanis 1/2" Medium per6m 178,200
15 Pipa Galvanis 3/4" Medium per6m 215,000
16 Pipa Galvanis 1" Medium per6m 330,000
17 Pipa Galvanis 1,5" Medium per6m 437,000
18 Pipa Galvanis 2" Medium per6m 684,200
19 Pipa Galvanis 3" Medium per6m 1,127,000
20 Pipa Galvanis 4" Medium per6m 1,633,000
STANDAR BAHAN DAN UPAH

NO. Jenis Barang/Bahan/Upah Uraian SATUAN USULAN 2018


UPAH KERJA
1 Mandor Lapangan org/hari 100,000
2 Kepala Tukang Batu org/hari 90,000
Kepala Tukang kayu org/hari 100,000
Kepala Tukang Cat org/hari 90,000
Kepala Tukang Besi org/hari 90,000
Kepala Tukang Las org/hari 100,000
Kepala Tukang Pelitur org/hari 100,000
Kepala Tukang Bor org/hari 90,000
Kepala Tukang Pipa org/hari 90,000
3 Tukang Batu org/hari 80,000
Tukang Kayu org/hari 90,000
Tukang Cat org/hari 85,000
Tukang Besi org/hari 85,000
Tukang las org/hari 90,000
Tukang Pelitur org/hari 90,000
Tukang Bor org/hari 90,000
Tukang Listrik org/hari 100,000
Tukang pipa org/hari 85,000
Tukang taman org/hari
4 Pekerja org/hari 65,000
5 Juru ukur org/hari 90,000
6 Mekanik Terampil org/hari 110,000
7 Operator terampil org/hari 100,000
8 Pembantu operator org/hari 80,000
10 Penganyam bronjong org/hari 75,000
11 Sopir personil org/hari 105,000
12 Logistik org/hari 110,000
13 Site manager org/hari 150,000
14 Geologis org/hari 120,000
15 Pembantu Mekanik org/hari 65,000
16 Pembantu Sopir org/hari 65,000
17 Penjaga malam org/hari 65,000
18 Upah tanam bunga /polibag
Upah tanam pohon dia < 20 cm /titik pohon
Upah tanam pohon dia 25 - 50 cm /titik pohon
Upah tanam pohon dia 50 - 100 cm /titik pohon
Upah roll pipa 1"- 2" m
Upah roll pipa 3"- 4" m
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk


ALUMINIUM
1 Kusen Alumunium Perak 4
2 Kusen Alumunium Coklat 4
3 Kusen Alumunium Putih doff / hitam 4
4 Kusen Alumunium urat kayu 4
5 Kusen Alumunium Perak 4 ( YKK ) YKK
6 Kusen Alumunium Coklat 4 ( YKK ) YKK
7 Kusen Alumunium Putih doff / hitam 4 ( YKK ) YKK
8 Kusen Alumunium urat kayu 4 ( YKK ) YKK
9 Daun Pintu Alumunium Perak 3
10 Daun Pintu Alumunium Coklat 3
11 Daun Pintu Alumunium putih doff 3
12 Daun Jendela Alumunium Perak
13 Daun Jendela Alumunium Coklat
14 Daun Jendela Alumunium Putih doff
15 Profil Pembungkus Kaca Perak
16 Profil Pembungkus Kaca Coklat
17 Profil Pembungkus Kaca Putih Doff
18 Silicon
19 Sealand
20 Handle Alumunium Sedang
21 Handle Alumunium Besar
22 Alumunium Strip
VEY HARGA BAHAN BANGUNAN

Harga
Satuan
2018

m 90,500
m 102,600
m 102,600
m 217,300
m 193,900
m 235,700
m 253,000
m 386,400
Lonjor 143,700
Lonjor 155,200
Lonjor 201,200
Lonjor 212,700
Lonjor 232,800
Lonjor 253,000
Lonjor 34,500
Lonjor 34,500
Lonjor 34,500
Tube 40,200
Tube 40,200
bh 74,700
bh 103,500
m' 30,850
DAFTAR SURVEY HARGA BAHAN BANGUNAN
SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk


BAHAN SANITAIR
1 Afour Bottle
Afour Stainless
2 Bak air (tandon) Fibre kapasitas 550 m3 Gapura
Bak air (tandon) Fibre kapasitas 550 m3 Pinguin
Bak air (tandon) stainless kapasitas 500 m3
3 Bak air (tandon) Fibre kapasitas 1100 m3
Bak air (tandon) Fibre kapasitas 1100 m3 Pinguin
Bak air (tandon) stainless 1100 m3
4 Bak cuci piring logam 100 ( 84 x 47,5)
5 Kitchenzink
6 Klosed duduk porselint Komp. (AS) INA
7 Klosed duduk putih porselen komplit
8 Klosed duduk putih tanpa bak INA ( amerika standart )
9 Klosed duduk warna tanpa bak INA ( amerika standart )
10 Klosed duduk putih + bak air
11 Klosed duduk standart TOTO, SAN EI, WASSER
12 Klosed duduk non standart TOTO, SAN EI, WASSER
13 Klosed jongkok keramik ina muda
14 Klosed jongkok keramik ina tua
15 Klosed jongkok porselen warna putih
16 Klosed jongkok teraso lokal
17 Klosed jongkok putih TOTO
18 Urinoir biasa
Urinoir komplit TOTO, WASSER
19 Wastafel biasa INA ( amerika standart ), TOTO, WASSER
Wastafel komplit INA ( amerika standart ), TOTO, WASSER
20 Kran air plastik Amico
Kran biasa Onda
Kran air stainless Ozi
Kran air stainless 3/4" Ballvalve kuningan
Kran zink Dupon
Doule kran WASSER, DUPON
Double kran stainless Onda, WASSER, DUPON
21 Stop kran stainless/shower
Stop kran plastik
Stop kran logam
22 Shower mandi biasa Soligen
Shower mandi biasa Dupon plastik
Shower mandi stainless
Shower mandi set
23 Floor drain plastik Dupon
Floor drain logam tipis Soligen tipis
Floor drain stainless Soligen
24 Bak air kamar mandi plastik / fiber
Bak air kamar mandi keramik
25 Pipa / slang spiral saluran kran 35 cm
26 Seal Tape
27 Kran Sensor
28 Hand driyer
29 Shower spray toto
Tempat Sabun
30 Kran angsa Onda
Kran angsa Soligen spiral
31 Kran wastafel stainless
Kran wastafel biasa
32 Pompa air kedalaman 9 m otomatis Shimitzu
Pompa air kedalaman 9 m non otomatis Shimitzu
Pompa air kedalaman 30 m Shimitzu
Pompa air kedalaman 40 m Shimitzu

HYDRANT
Panel Hydrant Type C uk. 66x95x20
Panel Hydrant Type B uk. 75x125x18
Panel Hydrant Type A1 uk. 52X66X15
Panel Hydrant Type A2 uk. 80x100x18
Box PMK uk. 27x44x18 (3 kg)
Box PMK uk. 35x60x20 (6 kg)
Box PMK uk. 40x65x25 (9kg)
VEY HARGA BAHAN BANGUNAN

Harga
Satuan
2018

Buah 33,300
Buah 86,200
Buah 790,600
Buah 1,265,000
Buah 2,242,500
Buah 1,566,800
Buah 1,840,000
Buah 3,248,700
Buah 218,500
Buah 176,300
Buah 1,495,000
Buah 1,380,000
Buah 458,000
Buah 480,100
Buah 1,147,400
Unit 707,250
Unit 2,415,000
Buah 155,200
Buah 183,000
Buah 175,300
Buah 74,850
Buah 350,700
Buah 1,725,000
Buah 3,680,000
Buah 253,000
Buah 362,200
Buah 13,900
Buah 19,100
Buah 44,800
Buah 63,200
Buah 117,800
Buah 264,500
Buah 245,300
Buah 115,000
Buah 23,000
Buah 55,700
Buah 80,500
Buah 130,500
Buah 241,500
Buah 2,875,000
Buah 17,200
Buah 30,100
Buah 74,700
Buah #DIV/0!
Buah #DIV/0!
Set 64,400
Buah 4,700
Buah 1,725,000
Buah 984,350
Buah 84,300
Buah
Buah 109,200
Buah 172,500
Buah 230,000
Buah 60,300
Buah 598,000
Buah 408,200
Buah 1,874,500
Buah 2,415,000

Unit
Unit
Unit
Unit
Unit
Unit
Unit
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk


ALUMINIUM COMPOSITE PANEL (ACP)
Tebal panel / Al. Skin (mm)
1 ACP 4/0.5 - PVDF-3-Coat 35u - Dove/Glitter/Glossy (exterior) 1220x4880
ACP 4/0.3 - PVDF-2-Coat 25u - Dove/Glitter (exterior) 1220x4881
ACP 4/0.3 - PVDF-2-Coat 25u - Glossy (exterior) 1220x4882
ACP 4/0.3 - PVDF-2-Coat 25u - WD24 & WD93 (exterior) 1220x4883
2 ACP 3/0.21- Milk Finish - Brush silver (rambu) 1000x2000
ACP 3/0.21- Milk Finish - Brush silver (rambu) 1220x1800
ACP 3/0.21- Milk Finish - Brush silver (rambu) 1220x2440
ACP 3/0.21- Milk Finish - Brush silver (rambu) 1500x2250
ACP 3/0.21- Milk Finish - Brush silver (rambu) 1500x4500
ACP 4/0.3 - PVDF/PE - Bright silver (JPO) 1220x4880
BANGUNAN

INFO PT. ALDE

Harga RESPONDEN
Satuan
Usulan 2019 1 2 3

m2 418,000 385,000 346,500


m2 250,000 230,000 207,000
m2 266,000 245,000 220,500
m2 467,000 430,000 387,000
m2 353,000 325,000 292,500
m2 380,000 350,000 315,000
m2 543,000 500,000 450,000
m2 571,000 525,000 472,500
m2 1,141,000 1,050,000 945,000
m2 1,358,000 1,250,000 1,125,000
398,475 418,399 418,000
238,050 249,953 250,000
253,575 266,254 266,000
445,050 467,303 467,000
336,375 353,194 353,000
362,250 380,363 380,000
517,500 543,375 543,000
543,375 570,544 571,000
1,086,750 1,141,088 1,141,000
1,293,750 1,358,438 1,358,000
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA
KABUPATEN

No Jenis Pekerjaan

ACOUSTICS PANEL
1 Acoustics Noise Control
A Sound Absorbing Materials
Fiber 300 1.5m2 White meter - Acoustics Absorbing Material
Fiber 600 1.5m2 White meter - Acoustics Absorbing Material
Fiber 800 1.5m2 White meter - Acoustics Absorbing Material
Fiber 1000 1.5m2 White meter - Acoustics Absorbing Material
B Vibration & Sound Insulation Materials
Mat Resin 2A 1m2 sheet - Acoustics Vibration Insulation Material
Paint EZ1 1Litre bottle - Acoustics Vibration Insulation Material
Regufoam Vibration 150 1.5m2 meter - Vibration Damping Foam Material
Regupol Vibration 300 1.25m2 meter - Vibration Damping Rubber Material
Noise Curtain
Door Seal Rubber Brown
2 Acoustics Treatment
A Sound Absorbing
BroadSound Treatment 12060 Black unit - Broadband Acoustics Panel Absorber
BroadSound Treatment 6060 Black unit - Broadband Acoustics Panel Absorber
EchoBaffle Square 80 Beige unit - Acoustics Fabric Panel
EchoBaffle Square 40 Beige unit - Acoustics Fabric Panel
EchoBaffle Honeycomb 80 Biege unit- Acoustics Fabric Panel
EchoBaffle Honeycomb 40 Beige unit - Acoustics Fabric Panel
EchoBaffle Diamond 40 Beige unit - Acoustics Fabric Panel
EchoBaffle Triangle 40 Beige unit - Acoustics Fabric Panel
B Bass Trap
CornerBass Treatment Black unit - Bass Trap Corner Panel
PerfoBass Treatment 12060 Black unit - Bass Trap Perforated Fabric Panel
PerfoBass Treatment 6060 Black unit - Bass Trap Perforated Fabric Panel
SlatBass Treatment 12060 Black unit - Bass Trap Slat Wooden Panel
SlatBass Treatment 6060 Black unit - Bass Trap Slat Wooden Panel
C Sound Diffuser
Soundfusser Treatment SW Black 12pc box - High Frequency Acoustics Sound Difuser
Soundfusser Treatment QRD7.12060 Black unit - Quadratic Residue Difuser 7 Panel
Soundfusser Treatment QRD7.6060 Black unit - Quadratic Residue Difuser 7 Panel
Soundfusser Treatment QRD7.2D unit - Quadratic Residue Difuser 7 Panel
3 Architectural Acoustics
A Wall and Ceiling Acoustic Panel
Board 230 12060 White sheet - Acoustics Board Ceiling Wall
Perfowood 12060 Dark Brown meter2 - Perforated Wooden Acoustics Ceiling Wall
Perfowood 6060 Dark Brown meter2 - Perforated Wooden Acoustics Ceiling Wall
B Movable Acoustic Partition
MAP 753 unfinished metersq - Movable Acoustics Partition STC53 7 meter
SURVEY HARGA BAHAN BANGUNAN

:
: BANYUWANGI

Harga
Merk Satuan
2018

m 199,200
m 371,900
m 498,000
m 624,200

sheet 358,600
bottle 358,600
m 2,722,900
m 1,992,300
metersq 2,656,500
m 19,600

unit 1,859,500
unit 1,195,400
unit 464,800
unit 325,400
unit 464,800
unit 325,400
unit 464,800
unit 325,400

unit 4,516,000
unit 1,593,900
unit 1,261,800
unit 2,922,100
unit 2,072,000

High Frequency Acoustics Sound Difuser box 677,400


unit 3,719,100
unit 2,125,200
unit 4,781,700

sheet 385,100
sheet 717,200
sheet 557,800
metersq 7,962,800
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk Satuan


BAHAN LAINNYA
Bronze Impala 3,75 L
Cat kayu, besi Emco STD Kg
Cat kayu, besi Emco bintang Kg
Cat menie (besi/kayu) cap pedang Kg
Mowilex woodsetain Mowilex Liter
Mowilex woodfiller Mowilex Liter
Lem kayu Fox Kg
Plamur besi / Dempul besi Pedang Kg
Plamur kayu Pedang Kg
Plamur tembok instan 5 Kg
Politur Mowilex Liter
Soda api 400 gr
Spiritus Naga Liter
Spiritus a spesial 5L
Thinner Thinner TJ A nisan Liter
Thinner Thinner TJ B bintang Liter
Teer Kg
Vernis Boyo Liter
Menie Besi Belmas(hijau) kg
Cat tembok dasar 2,5 kg undercoat mowilex 2,5 kg
Cat tembok biasa 1 kg Vinilex 5kg
Cat tembok biasa 5 kg Avitex, Paragon 5kg
Cat tembok biasa 5 kg Mowilex 5kg
Cat tembok biasa 5 kg Catylax 5kg
Cat tembok biasa kg
Cat genteng 2,5 liter Dulux - watershiel roof paint 2,5 l
Cat genteng 2,5 liter Jotun-Jota roof, Avitex 2,5 l
Cat genteng 2,5 liter Mowilex-roof paint 2,5 l
Cat genteng Liter
Cat dinding interior 2,5 liter Dulux pentalite 2,5 l
Cat dinding interior 2,5 liter Nippon spotles 2,5 l
Cat dinding interior 2,5 liter Mowilex 2,5 l
Cat dinding interior 2,5 liter Jotun strat matt 2,5 l
Cat dinding interior Liter
paragon standar 5 kg
Cat dinding interior 2,5 liter Paragon premium 1000 2,5 l
Cat dinding interior 2,5 liter Paragon premium gold 2,5 l
Cat dinding exterior 2,5 liter Paragon durashield 2,5 l
Cat dinding exterior 2,5 liter Dulux weatershield 2,5 l
Cat dinding exterior 2,5 liter Mowilex 2,5 l
Cat dinding exterior 2,5 liter Nippon weather bond 2,5 l
Cat dinding exterior 2,5 liter Jotun strat matt premium 2,5 l
Cat dinding exterior Liter
Waterproof Nodrop Liter
Waterproof Nodrop 4 kg
Y HARGA BAHAN BANGUNAN

Harga
2018

48,800
61,500

29,300
17,800
32,700
13,200
41,400
28,700
26,400
86,800
32,200
19,200

25,800
25,800

45,100
33,900
-
30,100
101,900
105,800
137,400
28,500
276,000
207,700
189,700
103,200
207,000
195,500
165,600
161,000
83,800

143,700
223,600
270,200
322,000
188,600
207,000
218,500
107,600
189,700
47,400
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk Satuan


BAHAN BETON CETAKAN
Readymix B.0 m3
Beton Ready Mix K 125 m3
Beton Ready Mix K 175 m3
Beton Ready Mix K 225 m3
Beton Ready Mix K 250 m3
Beton Ready Mix K 275 m3
Beton Ready Mix K 300 m3
Beton Ready Mix K 350 m3
Beton Ready Mix K 400 m3
Beton Ready Mix K 450 m3
Beton Ready Mix K 500 m3
Buis beton diameter 15 cm Buah
Buis beton diameter 20 cm Buah
Buis beton diameter 30 cm Buah
Buis beton diameter 40 cm Buah
Buis beton diameter 50 cm Buah
Buis beton U 15 cm Buah
Buis beton U 20 cm Buah
Buis beton U 30 cm Buah
Buis beton U 40 cm Buah
Buis beton U 50 cm Buah
Buis beton U 1 m Buah

BETON CETAK FEROSEMEN


Dinding Beton
Dinding Beton Ferosemen uk. 30x40x100 Dimensi P = 1,00 cm ; L = 0,46 cm ; set
Dinding Beton Ferosemen uk. 40x50x100 Dimensi P = 1,00 cm ;L = 0,56 cm ; set
Dinding Beton Ferosemen uk. 50x60x100 Dimensi P = 1,00 cm ; L = 0,66 cm ; set
Dinding Beton Ferosemen uk. 30x40x120 Dimensi P = 1,20 cm ; L = 0,46 cm ; set
Dinding Beton Ferosemen uk. 40x50x120 Dimensi P = 1,20 cm ;L = 0,56 cm ; set
Dinding Beton Ferosemen uk. 50x60x120 Dimensi P = 1,20 cm ; L = 0,66 cm ; set
Penutup Beton
Tutup Beton uk. 30x40x100 Dimensi P = 1,00 ; L = 0,46 cm ; T set
Tutup Beton uk. 40x50x100 Dimensi P = 1,00 ; L = 0,56 cm ; T set
Tutup Beton uk. 50x60x100 Dimensi P = 1,00 ; L = 0,66 cm ; T set
Tutup Beton uk. 30x40x120 Dimensi P = 1,20 ; L = 0,46 cm ; T set
Tutup Beton uk. 40x50x120 Dimensi P = 1,20 ; L = 0,56 cm ; T set
Tutup Beton uk. 50x60x120 Dimensi P = 1,20 ; L = 0,66 cm ; T set
GUNAN

INFO

Harga Harga RESPONDEN


2018 usulan 2019 1 2 3

805,000
902,750
925,750
943,000
954,500
966,000
977,500
1,023,500
1,069,500
1,115,500
1,173,000
23,400 23,400
33,900 33,900
42,500 42,500
46,600 46,600
57,300 57,300
27,150 27,150
36,000 36,000
46,600 46,600
64,550 64,550
57,300 57,300
174,600 174,600

423,000
510,000
623,000
443,000
542,000
666,000

127,000
166,000
210,000
151,000
198,000
250,000
rata-rata keuntunga pembulatan

#DIV/0! #DIV/0! #DIV/0!


#DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
BAHAN BANGUNAN
NO. NAMA BARANG

A. BAHAN CAT
a. Decorative Wall Paint
1 Decor ACR Enamel SB DAE - 550
- Warna standart

- Warna Special 1

- Warna Special 2

2 Decor Primer SB
- AS-310

Decor Wall Sealer SB


- DWS-380

3 Thinner DA ( Untuk DAE-550 )


- DWS-380

4 Thinner DA ( Untuk DAE-550 )


- DWS-380

5 Decorflex DF-97
- Warna Standar

- Warna Special

6 Decorshield DW-500
- Warna Standar

- Warna Special

7 Decorcryl DI-400
- Warna Standar

- Warna Special 1

- Warna Special 2

8 Decorlotus DLI-480
- Warna Standar

9 Décor ACR Enamel WB DAE-560


- Warna Standar

- Warna Special 1

- Warna Special 2

10 Decor Wall Filler


- DWF-200
11 Decor Primer WB
- AR-300

12 Decor Wall Sealer WB


- DWF-200
13 ECO Emulsion EE-4010
- Warna Standar

- Warna Special

14 Ecoshield
- ES-600

15 ECO GYPSUM
- Gypsum 4050

- EPG-4049 Primer

16 ECO PLAMUR
- ECP 4030

17 Eco Emulsion Primer


- EAR 4030
18 Ceria
- CR-6100

- CR-6100 White 8

- CR-6100 White 8

-Ceria Anti Bocor


CR-6000 White/Grey

19 Procrete
- BDA-810

- CF-700

b. Wood Finishing & Wood Care


1 Impra Wood Filler
- WF-115

- SH-113

- SH-114

- WP-117

2 Impra Wood Stain WS-162 B


- Warna Muda

- Warna Tua

3 Impra Melamine System


- MSS-123/124

- ML-131 CLEAR

4 Impra Melamine System


- MSS-123/124

- ML-131 CLEAR

5 Impra NC System
- SS-121

- NC-141 CLEAR

6 Impra Ny Acrylic System


- NYSS-155
- NYL-141 CLEAR

7 Impra Fancy Sealer


- FS-127

8 Complementary
- Melamine

- Hardener

9 Ultran Politur P-01


- P-01 Transparent Color
10 Ultran Politur P-03 UV
- P-03 Transparent Color
- P-03 Transparent Color
- P-01 Transparent Color
11 Ultran Yunior P-05
- P-05 Transparent Color
- P-05 Clear
12 Impra Gum Sealer
- GS-920 Clear
13 Propan Fungi Protection
- PFP-920 Clear
c. Furnikote
1 Furnikote Wood Filler
- FSH-111
W.Standar

2 Furnikote Wood Stain


- FWS-111
Warna Muda

Warna Tua

3 Furnikote ML Lacquer
- FMSS-312

- FMSS-312
Gloss

Dof/Semi

4 Furnikote ML Lacquer
- FSS-412

- FNC-417 Clear

5 Furnikote Melamine Hardener


- Hardener FMH-32

6 Pastigloss Wood Filler


- PSH-811
W. Standar

7 Pastigloss ML Lacquer
- PMSS-512

- PMSS-512 **

- PML-517

- PMSS-510 BRT **
8 Pastigloss ML Lacquer
- Hardener PMH-50

- Hardener PMH-50 PAS


d. Furniture Wax & Antique Glaze
1 Propan Furniture Wax
- PFW-333 Natural
- PFW-333 Brown
- PFW-330 Natural
- PMV-320 Multipurpose

2 Propan Antique Finish


- AGZ-245 W.Standar
- AGZ-245 White
e. Complimentary Products
1 Propan Paint Remover
- PPR-730 Clear

- PPR-730 Clear
f. Waterbased System
1 Impra Aqua Wood Filler
- AWF-911

2 Impra Aqua Sanding Sealer


- ASS-941

3 Ultran Aqua Lacquer


- ASS-941
Clear Gloss

Clear Dof

Clear Dof

4 Ultran Aqua Lacquer


- AL-961

5 Impra Aqua Lacquer


- AL-961

6 Propan Aqua Putty


- AWP-919 WB W. Standar

7 Acrylux
- AAP-950 Primer

- AAC-955
Color

Color Dof

- Special Color

- Metalic Color

- AAL-965

8 Propan Super Gold


- SG-07 WB Gold

g. Ultran Wood Care


1 Exterior Ultran Lasur
- EL -501 Transparent Color

- EL -501 Oxide Color

- EL -501 Natural

2 Exterior Ultran Lasur Laset


- EL -501 LS Laser Color
3 Exterior Ultran Deck Lasur
- EDL -501 LS Laser Color

4 Ultran Parquet Lack


- UPL-77 Clear Gloss
- UPL- 77 Clear Matt/Semi
5 Ultran Vernis
- V-09 Warna Standar
- V-10 Warna Standar
6 Ultran Teak Oil
- UTO-555

- UTO-553
- UTO-557

- UTO-553 Color
7 Ultran Linceed Oil
- UTO-551

8 Ultran Aqua Lasur


- AEL-505 Warna Standar
9 Ultran Aqua Lasur
- AQP-630 Warna Standar
10 Ultran Aqua Deck Lasur
- AQP-605 Warna Standar
11 Ultran Aqua Deck Lasur
- APL-850

12 Ultran Aqua Deck Lasur


- PWS-631 Warna Standar
- PWS-631 VC Warna Standar
h. Solvent Based
1 MX-99 TH
- Standard Color
- Special Color
- Clear Gloss
2 Cerakote
- CTC-998
- CTC-997 PU HQ

- CTP-980 WB

CTC-999
- Standar Color

- Special Color

i. Metal Protective Coating


1 Primtop
- Primtop PT-88 Warna Standar

2 Metalkote - Alkyd Primer


- AP-291 SB Warna Standar

3 Synthetic 2000
- Synthetic 2000 warna standar

4 Synthetic 3000
- Synthetic 3000 warna standar
5 Ultran Super Enamel
- USE - 60 Clear Gloss, Clear Dof

6 Aqua Primtop
- APT - 90 WB Warna Standar
7 Aqua Metal Primer
- AP - 860 WB Warna Standar

8 Go Fast A-1000
- Warna Standar
- Canary Yellow, Traffic Red
- Super White, Super White Dof
9 Sengkote WB
- SK - 950 WB Warna Standar

10 Rost X
- Rost X-10
j. Stone Care & Fiber Cement Coating
1 Propan Stone Care
- SC - 50 SB Gloss

- SC - 80 SB Dof
2 Popan Stone Care Cat Batu Candi
-SC - 70 SB Black

- SC - 71 SB Super Black

3 Sicosol Solventbased
- Sicosol

4 Stonkote 1K - u/ Dinding Batu Alam


- SC - 55 SB Clear Gloss
- SC - 85 SB Clear Dof
- SC - 75 SB Black Gloss
- SC - 76 SB Black Dof
5 Star Stone u/ Dinding Batu Alam
- Star Stone Clear Gloss / Dof
- Star Stone Black Gloss / Dof
6 Stonkote 2K - u/ Lantai Batu Alam
- SFC - 633 TH Clear Gloss
7 Propan Aqua Stone Care
- SC - 91 WB

8 Sicosol Waterbased
- SC - 91 WB
9 Propan Concrete Stain
- PCS - 900 Warna Standar
k. Fiberkote Sealer
1 Fiberkote - u/ Papan Fiber Semen
- FPS - 820 SB

l. Fiberkote & Glaskote


1 Glasskote
- GK - 05 WB Warna Standar
2 Fiberkote - u/ Wood Plastic Composite
- FBK - 777 WB Warna Standar
3 Fiberkote - u/ Papan Fiber Semen
- FBK - 888 WB W. Standar

- FBK - 889 WB W. Standar

m. Propan PU
1 Propan Multi Purpose PU Acrylic
Clear System
- PUSS - 760 - 2K

- PUL - 765 2K

- PUL - 765 - 2K Gloss

Color System
- PUSF - 781 - 2K

- PUC - 786 - 2K

2 Propan PU - 91
- PUSS - 91
- PUL - 91 Clear

3 Propan Easy To Use PU


- PUSS - 740 -2K

- PUL - 745 -2K

4 Propan Italian PU
- PUSS - 743 - 2K

- PUL - 748 - 2K
5 Propan PU - 41
- PUSS - 41

- PUL - 41 Clear

6 Propan PU Non Yellowing


- PUSS - 741 - NY

- PUL - 746 - NY

7 PE - PU Combi System
- PUS - 731 -2K

- PESS - 762

- PEL - 763 NF

- PEL - 7461 - 2K HG

8 Propan PU Color
PU Color Acrylic
- PUC - 756 - NY White

- PUC - 756 - NY Black

PU Primer Acrylic
- PUP - 751 - NY White

9 Propan Value PU
- PUSS - 744 - 2K VP

- PUL - 749 -2K VP

10 Union PU
- 16-30 P Urethane Sanding A
- 16-301 P Urethane Sanding B
- 21-03 P Urethane Flat A
- 21-07 P Urethane Flat A
- 26-58 P Urethane Gloss A
- 21-102 P Urethane Flat B
- 26-581 P Urethane Gloss B
n. PROPAN EPOXY BOND
1. EWA- 120
2. EWA- 130

p. PROPAN EPOXY BOND MARINE


1. EWA-135

q. IMPRA BOND
1. LEM PUTIH IBW-630

r. PROSEAL
1. PAS-100 WARNA
2. PAS-100 CLEAR

s. PROPAN NO NAIL
1. PNN-200

t. EXPOXY PRIMER SURFACER


1. PCR 1000 EP GREY/WHITE
2. PCR 1000 EP GREY/WHITE
3. PCR 3300 PU GREY
4. PROPAN HIGH FILLER EPOXY
- BLACK/GREY/WHITE
- BLACK/GREY/WHITE

u. PU CLEAR COAT
1. PCR 6721 HS CLEAR GLOSS
2. PCR 3600 HS CLEAR GLOSS
v. DUROGLOSS KLARKOTE
1. DUROGLOSS KLARKOTE

w. DUROGLOSS NC COLOR (DUCO)


1. STANDART COLOR
STANDART COLOR
2. SPECIAL COLOR
SPECIAL COLOR
3. METALLIC/PEARL/GOLD
METALLIC/PEARL/GOLD

x. SPOT PUTTY
1. PCR SPOT PUTTY

y. AEROSOL PAINT (CAT SEMPROT)


1. ZEBRA PRO
SOLID COLOR GLOSS / DOF
METALIC COLOR
WOOD STAIN COLOR
FLOURESCENT COLOR

z. COMPLEMENTARY
1. THINNER PU
THINNER PU
THINNER PU
2. MS-21
MS-21
3. GA-06
GA-06

aa. DUROGLOSS RUBBING COMPOUND


1. RUBBING COMPLOUND
RUBBING COMPLOUND

bb. ULTRAPROOF
1. UPR-960
UPR-960
UPR-960

cc. ULTRALASTIC
1. UL-920
UL-920
2. ULE-925
ULE-925

dd. ULTRADRY
1. UD-900
UD-900

ee. ULTRASEAL
1. US-970
US-970
US-970

ff. TRFFIKOTE
1. TFK-108 WB
TFK-108 WB
TFK-108 WB

gg. TENNOKOTE
1. TNK-1000 WA STANDART COLOR
TNK-1000 WA STANDART COLOR
2. TNK WA SPECIAL COLOR
TNK WA SPECIAL COLOR
3. TNK - 1020 WA
TNK-1000 WA
SPESIFIKASI SATUAN HARGA
USULAN 2019

2.5 KG 96,400 241,000


20 KG 90,650 1,813,000
2.5 KG 110,800 277,000
20 KG 105,200 2,104,000
2.5 KG 173,600 434,000
20 KG 167,950 3,359,000

2.5 LT 102,000 255,000


20 LT 98,700 1,974,000

2.5 LT 87,600 219,000


20 LT 84,050 1,681,000

3.8 LT 49,737 189,000


20 LT 47,100 942,000

3.8 LT 49,737 189,000


20 LT 47,100 942,000

2.5 LT 134,400 336,000


20 LT 123,550 2,471,000
2.5 LT 141,600 354,000
20 LT 130,350 2,607,000

2.5 LT 118,800 297,000


20 LT 108,750 2,175,000
2.5 LT 126,400 316,000
20 LT 115,800 2,316,000

2.5 LT 68,000 170,000


20 LT 62,650 1,253,000
2.5 LT 74,400 186,000
20 LT 69,300 1,386,000
2.5 LT 90,000 225,000
20 LT 84,500 1,690,000

2.5 LT 82,800 207,000


20 LT 75,650 1,513,000

2.5 LT 272,000
20 LT 2,066,000
2.5 LT 302,000
20 LT 2,306,000
2.5 LT 379,000
20 LT 2,918,000

4 KG 108,000

2.5 LT (3KG) 156,000


20 LT 1,055,000

2.5 LT 160,000
20 LT 1,211,000

5 KG 145,000
25 KG 701,000
5 KG 183,000
25 KG 889,000

5 KG 201,000
25 KG 973,000

5 KG 120,000
25 KG 594,000
5 KG 138,000
25 KG 618,000

1 KG 17,000
5 KG 61,000
25 KG 280,000

4 KG 156,000
21 KG 743,000
5 KG 99,000
25 KG 443,000
5 KG 92,000
20 KG 332,000
5 KG 92,000
20 KG 332,000

4 KG 153,000
20 KG 683,000

1 LT 61,000
5 LT 272,000
20 LT 1,019,000
5 KG 61,000
25 KG 250,000

1 KG 40,000
5 KG 179,000
30 KG 943,000
1 KG 40,000
5 KG 179,000
30 KG 943,000
1 KG 52,000
5 KG 235,000
30 KG 1,266,000
1 KG 51,000
5 KG 219,000
30 KG 1,169,000

1 LT 74,000
5 LT 342,000
20 LT 1,274,000
1 LT 81,000
5 LT 385,000
20 LT 1,482,000

1 LT 74,000
5 LTS 319,000
20 LTS 1,216,000
1 LT 74,000
5 LTS 319,000
20 LTS 1,216,000

1 LT 74,000
5 LTS 319,000
20 LTS 1,216,000
1 LT 74,000
5 LTS 319,000
20 LTS 1,216,000

1 LT 74,000
5 LTS 319,000
20 LTS 1,216,000
1 LT 74,000
5 LTS 319,000
20 LTS 1,216,000

1 LT 115,000
5 LTS 530,000
20 LTS 2,056,000
1 LT 115,000
5 LTS 530,000
20 LTS 2,056,000

1 LT 76,000
5 LTS 360,000
20 LTS 1,359,000

0,1 LT 16,000
0,5 LT 39,000
2 LT 119,000
0,1 LT 16,000
0,5 LT 39,000
2 LT 119,000

1 LT 72,000

1 LT 72,000
1 LT 72,000
1 LT 72,000
1 LT 59,000
1 LT 63,000

1 LT 171,000

1 LT 75,000

1 KG 32,000
5 KG 140,000
30 KG 726,000

1 LT 51,000
5 LT 233,000
20 LT 844,000
1 LT 53,000
5 LT 253,000
20 LT 985,000

1 LTS 61,000
5 LTS 249,000
20 LTS 954,000

1 LTS 64,000
5 LTS 285,000
20 LTS 1,071,000
1 LTS 65,000
5 LTS 289,000
20 LTS 1,085,000

1 LTS 61,000
5 LTS 249,000
20 LTS 954,000
1 LTS 60,000
5 LTS 280,000
20 LTS 1,059,000

0.1 LT 12,000
0.5 LT 30,000
2 LT 98,000

1 KG 22,000
5 KG 95,000
30 KG 510,000

1 LTS 206,000
20 LTS 733,000
1 LTS 191,000
20 LTS 708,000
1 LTS 191,000
20 LTS 708,000
20 KG 655,000

0.5 LTS 24,000


2 LTS 78,000
1.8 LGS 67,000
1 KG 70,000
1 KG 87,000
1 KG 106,000
1 KG 72,000
16 KG 954,000

1 LT 92,000
1 LT 127,000

0.3 KG 24,000
1 KG 49,000
1 KG 49,000
1 KG 29,000
25 KG 509,000

1 LT 66,000
20 LT 1,166,000

0.9 LT 42,000
1 LT 66,000
20 LT 1,166,000
0.9 LT 53,000
1 LT 66,000
20 LT 1,166,000
0.9 LT 49,000
18 LT 66,000

1 LT 84,000
20 LT 845,000

1 LT 38,000
20 LT 1,541,000

1 KG 38,000
30 KG 721,000

0.9 KG 64,000
4 KG 261,000
20 KG 1,223,000

0.9 KG 90,000
4 KG 378,000
20 KG 1,804,000
0.9 KG 90,000
4 KG 378,000
20 KG 1,804,000
0.9 KG 99,000
4 KG 422,000
20 KG 2,039,000
0.9 KG 178,000
4 KG 766,000
20 KG 3,819,000
0.9 KG 88,000
20 KG 1,637,000

0.5 LT 88,000
0.9 LT 167,000
2.5 LT 428,000
20 LT 3,373,000

1 LT 93,000
5 LT 443,000
1 LT 88,000
5 LT 409,000
1 LT 102,000
5 LT 487,000

1 LT 104,000
1 LT 104,000
5 LT 484,000

3 LTS 328,000
3 LTS 375,000

3 LTS 328,000
3 LTS 471,000

0.8 LT 38,000
3.8 LT 162,000
5 LT 202,000
20 LT 760,000
0.8 LT 40,000
3.8 LT 180,000
5 LT 228,000
20 LT 883,000
0.8 LT 50,000
3.8 LT 213,000
5 LT 268,000
20 LT 1,031,000
0.8 LT 60,000

0.8 LT 69,000
3.8 LT 314,000
5 LT 386,000
20 LT 1,583,000

1 LT 111,000

1 LT 76,000

1 LT 119,000

1 LT 203,000
2.5 LT 497,000
20 LT 3,793,000

1 LT 76,000
1 LT 67,000

1 LTS 118,000
1 LTS 118,000
1 LTS 102,000

3 KGS 460,000
1 LTS 240,000
5 LTS 1,167,000
1 KGS 102,000
5 KGS
20 KGS

5 KGS 696,000
20 KGS 2,687,000
5 KGS 696,000
20 KGS 2,687,000

1 KG 71,000
20 KG 1,273,000

1 KG 40,000
5 KG 188,000
25 KG 823,000

0.9 LT 64,000
20 LT 1,263,000

0.8 LT 57,000

1 LTS 153,000
5 LTS 725,000
20 LTS 2,753,000

1 KG 100,000
20 KG 1,822,000
1 KG 98,000
20 KG 1,780,000

0.9 LT 67,000
0.9 LT 87,000
0.9 LT 70,000

1 KG 92,000
20 KG 1,656,000

1 LT 38,000

1 LT 85,000
2.5 LT 207,000
1 LT 85,000
2.5 LT 207,000
1 LT 89,000
2.5 LT 217,000
1 LT 89,000
2.5 LT 217,000

1 LT 87,000
2.5 LT 212,000

0.9 LT 67,000
0.9 LT 67,000
0.9 LT 67,000
0.9 LT 67,000

0.8 LT 48,000
0.8 LT 48,000

1 LTS 116,000

1 LT 78,000
2.5 LT 189,000

1 LT 78,000

1 LT 79,000

1 LT 68,000
2.5 LT 166,000

2.5 LT 153,000

1 LT 145,000

1 LT 94,000
2.5 LT 227,000
1 LT 94,000
2.5 LT 227,000

1 LTS 120,000
5 LTS 472,000
25 LTS 1,951,000
1 LTS 153,000
5 LTS 580,000
25 LTS 2,316,000
1 LTS 144,000
5 LTS 532,000
25 LTS 2,138,000

1 LTS 105,000
5 LTS 435,000
25 LTS 1,915,000
1 LTS 159,000
5 LTS 720,000
25 LTS 3,018,000

1 LTS 113,000
5 LTS 518,000
25 LTS 2,475,000
1 LTS 125,000
5 LTS 567,000
25 LTS 2,717,000

1 LTS 99,000
7.5 LTS 669,000
30 LTS 2,191,000
1 LTS 112,000
7.5 LTS 796,000
30 LTS 2,673,000

1 LTS 109,000
7.5 LTS 709,000
30 LTS 2,260,000
1 LTS 125,000
7.5 LTS 799,000
30 LTS 2,711,000
1 LTS 79,000
5 LTS 339,000
25 LTS 1,614,000
1 LTS 84,000
5 LTS 373,000
25 LTS 1,755,000

1 LTS 120,000
7.5 LTS 867,000
30 LTS 2,890,000
1 LTS 151,000
7.5 LTS 930,000
30 LTS 3,317,000

5 LTS 474,000
40 LTS 3,592,000
5.2 LTS 676,000
20.8 LTS 2,300,000
5.4 LTS 687,000
21.6 LTS 2,674,000
10 LTS 1,110,000
40 LTS 4,193,000

7.5 LTS 1,069,000


30 LTS 4,058,000
7.5 LTS 1,086,000
30 LTS 4,133,000

7.5 LTS 1,069,000


30 LTS 4,058,000

1 LTS 72,000
5 LTS 320,000
25 LTS 1,385,000
1 LTS 90,000
5 LTS 359,000
25 LTS 1,683,000

5 LT 406,000
5 LT 525,000
4 LT 317,000
4 LT 341,000
4 LT 260,000
1 LT 144,000
2 LT 181,000

1 KG 130,000
2 KG 142,000

2 KG 109,000

150 GR 73,000
300 GR 14,000
300 ML 29,000
300 ML 41,000

200 GR 23,000

1 LTS 76,000
20 LTS 1,480,000
1 LTS 101,000

1.3 KGS 58,000


26 KGS 1,078,000

1.5 LTS 217,000


1.25 LTS 170,000
0.5 LTS 67,000

0.9 LT 71,000
20 LT 1,433,000
0.9 LT 85,000
20 LT 1,682,000
0.9 LT 105,000
20 LT 2,070,000

220 GR 27,000

0.3 LT 26,000
0.3 LT 26,000
0.3 LT 26,000
0.3 LT 30,000

1 LT 36,000
20 LT 549,000
200 LT 4,675,000
100 ML 11,000
1 LT 75,000
100 ML 100,000
1 LT 46,000

0.4 LT 32,000
0.9 LT 51,000

1 KG 51,000
4 KG 189,000
20 KG 867,000

5 KGS 94,000
25 KGS 430,000
1KG 38,000
25 KG 430,000

1 LT 137,000
2.5 LT 330,000

1 KG 42,000
4 KG 158,000
20 KG 750,000

1 KG 87,000
2.5 KG 205,000
20 KG 1,534,000
5 KG 235,000
22.5 KG 1,006,000
5 KG 291,000
22.5 KG 1,006,000
5 KG 226,000
20 KG 848,000
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk Satuan

CONWOOD
CONWOOD LANTAI
Conwood Deck 4" 102x3050x14 ;
102x3050x14 ; 3,22 pack
3,22
Conwood Deck 6" 152x3050x14 ;
152x3050x14 ; 2,15 pack
2,15
Conwood Deck 8" 203x3050x14 ;
203x3050x14 ; 1,61 pack
1,61
Conwood Deck 4" 102x3050x25 ;
102x3050x25 ; 1,22 pack
1,22
Conwood Deck 6" 152x3050x25 ;
152x3050x25 ; 2,15 pack
2,15
Conwood Deck 8" 203x3050x25 ;
203x3050x25 ; 1,61 pack
1,61
Conwood Deck 12" 300x3050x25
300x3050x25 ; 1,09 pack
; 1,09

CONWOOD TANGGA
Conwood Stair 8" (vertikal)
200x1200x16 ; 0,83 pack
200x1200x16 ; 0,83
Conwood Stair 12" (horizontal)
300x1200x25 ; 0,83 pack
300x1200x25 ; 0,83
Conwood Stair 8" (handrail)
85x3050x30 ; 0,33 pack
85x3050x30 ; 0,33

4355400
Harga Harga HPS RESPONDEN
2018 2019 1 2

96,900 110,000 80,250 88,275 110,344


139,400 158,000 115,500 127,050 158,813
193,200 220,000 160,000 176,000 220,000
193,100 219,000 159,999 175,999 219,999
271,900 309,000 225,250 247,775 309,719
368,800 420,000 305,500 336,050 420,063
538,500 613,000 445,999 490,599 613,249
- - -
- - -
120,700 137,000 99,999 109,999 137,499
217,300 247,000 180,000 198,000 247,500
178,100 202,000 147,500 162,250 202,813
INFO rata-rata keuntungan pembulatan
15%

ESPONDEN
3

84,263 80,250 84,263 96,902 96,900


121,275 115,500 121,275 139,466 139,400
168,000 160,000 168,000 193,200 193,200
167,999 159,999 167,999 193,199 193,100
236,513 225,250 236,513 271,989 271,900
320,775 305,500 320,775 368,891 368,800
468,299 445,999 468,299 538,544 538,500

104,999 99,999 104,999 120,749 120,700


189,000 180,000 189,000 217,350 217,300
154,875 147,500 154,875 178,106 178,100
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA
KABUPATEN

No Jenis Pekerjaan

LANTAI KAYU
Parquet Jati 1,2cm x 5cm x 20 cm
Parquet Jati 1,2cm x 5cm x 25 cm
Parquet Jati 1,2cm x 5cm x 30 cm
Laminate Flooring Enviro 1,2cm x 5cm x 20 cm
Laminate Kendo Standar 8,3cm x 196cm x 1200mm
Laminate Kendo Special 8,3cm x 196cm x 1200mm
Laminate Golden Crown 0,83cm x 19,6cm x 120 cm
Parket Merbau 1,5 x 30,90 x 20 cm
Parket Merbau Jumbo 1,5 x 12 x 30.90cm
Parket Merbau Jumbo 1,5 x 14 x 50.60 cm
Parket kayu Keruing 1,5 x 13,5 x 30 cm
Parket kayu Sonokeling 1,5 x 14 x 50.60 cm
Parket kayu Sunkai 1,5 x 9 x 30.90cm

ARMANIO PARQUET
Frisco Mapple 7,5 x 75 x 900 mm
Arizona Beech 9,5 x 75 x 900 mm
Arizona Long Cinamon 9 x 75 x 1500 mm
Arizona teen Coconut 10 x 75 x 490 mm
Boston 1S Kempas 13,5 x 135 x 1800 mm
Boston 3S Merbau 13,3 x 195 x 2200 mm
Angeles Merbau 3S 14 x 195 x 2200 mm
Hamlet (HDF) Walnut 8 x 195 x 1215 mm
Decking Bengkirai 2 x 150 x 900 mm

TEKA PARQUET
Merbau Atrium Line 14 x 390 x 390 mm
Maple Concord 14 x 390 x 390 mm
White Oak Concord Line
White Oak Fumed
White Oak Grand Palais Old Style
Palisander Villa
Kempas Villa
Aksesori Skirting
Aksesori Treshold
Aksesori Edging
Havea Quick
Havea Dur
Merbau Quick
Merbau Dur
Merbau deck
Merbau Millenium
Merbau Line
Palisander Dur

GRACEWOOD PARQUET
Costul (DCW) 12 x 102 x 900 mm
Costul (DCW) 12 x 102 x 925 mm
Kalimantan Poon 12 x 102 x 900mm
Kalimantan Poon 12 x 102 x 925 mm
Light Nyatoh 12 x 102 x 900 mm
Light Nyatoh 12 x 102 x 925 mm
Dark Nyatoh 12 x 102 x 900 mm
Dark Nyatoh 12 x 102 x 925 mm
Padauk 12 x 102 x 900 mm
Padauk 12 x 102 x 925 mm
Kerangas 12 x 102 x 900 mm
Kerangas 12 x 102 x 925 mm

Aksesories
Skriting Profile / Plin T = 1,20 ; L = 10 ; P = 240
Skriting Profile / Plin T = 1,20 ; L = 8 ; P = 240
Skriting Profile / Plin T = 1,20 ; L = 6 ; P = 240
Adaption Profile T = 1,20 ; L = 4,40 ; P = 240
End Profile T = 1,20 ; L = 5,80 ; P = 240
Transition Profile T = 1,20 ; L = 4,40 ; P = 240
Staircase Nosing T = 2,20 ; L = 5,20 ; P = 240
Silent Warna Kayu
Silent Warna Putih / Hitam
Under Layer / Foam
Lem / Perekat

Harga Pemasangan Lantai Parket Kayu


Finishing melamik impra 2 komponen m2
Biaya pasang finishing PU UPL (anti gores) m2
Pemasangan diatas media keramik m2
Costume warna m2
Pemasangan adu manis m2
Biaya pasang skrirting m2
Pemasangan Parket di Lantai m2
Pemasangan Parket di Tangga trap
Pemasangan Asesories m2
Pembongkaran Parket Lama m2

Harga Biaya Pasang Lantai Kayu

Pasang Parket Solid Unfinish= Rp.125.000/m (Termasuk finishing menggunakan Melamine 2Komp)
Pasang Parket Solid Unfinish= Rp.145.000/m (Termasuk finishing menggunakan PU/ Poly Urethane)
Pasang Parket Solid sudah finish= Rp.42.000/m (Termasuk Under Layer Foam)
Pasang Parket Laminate= Rp.35.000/m (Termasuk Under Layer Foam)
Pasang Parket Engineer= Rp.35.000/m (Termasuk Under Layer Foam)
Ukuran 1,2cm x 5cm x 20cm = Rp 160.000,-/m2
Ukuran 1,2cm x 5cm x 25cm = Rp 180.000,-/m2
Ukuran 1,2cm x 5cm x 30cm = Rp 210.000,-/m2
Ukuran 1,2cm x5cm x 30cm-60cm = Rp 210.000,-/m2
Type parquet KW 2 semua ukuran Rp.145.000,-/m2
GA BAHAN BANGUNAN

:
: BANYUWANGI

Harga Harga HPS


Merk Satuan
2018 usulan 2019

1,2cm x 5cm x 20 cm m2 235,400 281,250


1,2cm x 5cm x 25 cm m2 277,700 302,500
1,2cm x 5cm x 30 cm m2 313,900 331,875
1,2cm x 5cm x 20 cm m2 253,500 253,500
8,3cm x 196cm x 1200mm m2 301,800 301,800
8,3cm x 196cm x 1200mm m2 350,100 350,100
0,83cm x 19,6cm x 120 cm m2 241,500 241,500
1,5 x 30,90 x 20 cm m2 470,900 470,900
1,5 x 12 x 30.90cm m2 519,200 519,200
1,5 x 14 x 50.60 cm m2 597,700 597,700
1,5 x 13,5 x 30 cm m2 239,000 239,000
1,5 x 14 x 50.60 cm m2 601,300 601,300
1,5 x 9 x 30.90cm m2 410,500 410,500

7,5 x 75 x 900 mm/m2 m2 295,800 295,800


9,5 x 75 x 900 mm/m2 m2 543,300 543,300
9 x 75 x 1500 mm/m2 m2 392,400 392,400
10 x 75 x 490 mm/m2 m2 368,200 368,200
13,5 x 135 x 1800 mm/m2 m2 784,800 784,800
13,3 x 195 x 2200 mm/m2 m2 664,100 664,100
14 x 195 x 2200 mm/m2 m2 664,100 664,100
8 x 195 x 1215 mm/m2 m2 295,800 295,800
2 x 150 x 900 mm/m2 m2 917,700 917,700

14 x 390 x 390 mm/m2 m2 1,026,300 1,075,000


14 x 390 x 390 mm/m2 m2 1,267,800 1,343,750
m2 m2 1,026,300 1,075,000
m2 m2 1,267,800 1,343,750
m2 m2 1,026,300 1,068,750
m2 m2 1,539,500 1,600,000
m2 m2 1,026,300 1,068,750
m2 m2 108,600 118,750
m2 m2 138,800 150,000
m2 m2 66,400 75,000
m2 m2 422,600 443,750
m2 m2 513,100 537,500
m2 m2 483,000 512,500
m2 m2 615,800 643,750
m2 m2 694,300 718,750
m2 m2 784,800 818,750
m2 m2 851,200 875,000
m2 m2 633,900 656,250

12 x 102 x 900 mm/m2 m2 392,400 406,875


12 x 102 x 925 mm/m2 m2 422,600 438,125
12 x 102 x 900mm/m2 m2 392,400 438,125
12 x 102 x 925 mm/m2 m2 422,600 406,875
12 x 102 x 900 mm/m2 m2 392,400 438,125
12 x 102 x 925 mm/m2 m2 422,600 438,125
12 x 102 x 900 mm/m2 m2 392,400 406,875
12 x 102 x 925 mm/m2 m2 422,600 438,125
12 x 102 x 900 mm/m2 m2 392,400 406,875
12 x 102 x 925 mm/m2 m2 422,600 438,125
12 x 102 x 900 mm/m2 m2 392,400 406,875
12 x 102 x 925 mm/m2 m2 422,600 438,125
-
-
T = 1,20 ; L = 10 ; P = 240 Batang 108,600 108,600
T = 1,20 ; L = 8 ; P = 240 Batang 102,600 102,600
T = 1,20 ; L = 6 ; P = 240 Batang 96,600 96,600
T = 1,20 ; L = 4,40 ; P = 240 Batang 90,500 90,500
T = 1,20 ; L = 5,80 ; P = 240 Batang 90,500 90,500
T = 1,20 ; L = 4,40 ; P = 240 Batang 90,500 90,500
T = 2,20 ; L = 5,20 ; P = 240 Batang 108,600 108,600
Botol 96,600 96,600
Botol 90,500 90,500
Meter 7,200 7,200
Botol 54,300 54,300

Rp. 152.500
Rp. 165.500
Rp. 27.500
Rp. 47.500
Rp. 82.500
Rp. 32.500
Rp. 25.000
Rp. 55.000
Rp. 10.000
Rp. 10.000

g menggunakan Melamine 2Komp)


g menggunakan PU/ Poly Urethane)
er Layer Foam)
INFO INFO rata-rata
2017 PER DESEMBER 2018

195,000 225,000 281,250 204,750


230,000 242,000 302,500 241,500
260,000 265,500 331,875 273,000
210,000 - 220,500
250,000 - 262,500
290,000 - 304,500
200,000 - 210,000
390,000 - 409,500
430,000 - 451,500
495,000 - 519,750
198,000 - 207,900
498,000 - 522,900
340,000 - 357,000
-
-
245,000
- 257,250
450,000
- 472,500
325,000
- 341,250
305,000
- 320,250
650,000
- 682,500
550,000
- 577,500
550,000
- 577,500
245,000
- 257,250
760,000
- 798,000
- #DIV/0!
- #DIV/0!
850,000
860,000 1,075,000 892,500
1,050,000
1,075,000 1,343,750 1,102,500
850,000
860,000 1,075,000 892,500
1,050,000
1,075,000 1,343,750 1,102,500
850,000
855,000 1,068,750 892,500
1,275,000
1,280,000 1,600,000 1,338,750
850,000
855,000 1,068,750 892,500
90,000
95,000 118,750 94,500
115,000
120,000 150,000 120,750
55,000
60,000 75,000 57,750
350,000
355,000 443,750 367,500
425,000
430,000 537,500 446,250
400,000
410,000 512,500 420,000
510,000
515,000 643,750 535,500
575,000
575,000 718,750 603,750
650,000
655,000 818,750 682,500
705,000
700,000 875,000 740,250
525,000
525,000 656,250 551,250
-
-
325,000
325,500 406,875 341,250
350,000
350,500 438,125 367,500
325,000
350,500 438,125 341,250
350,000
325,500 406,875 367,500
325,000
350,500 438,125 341,250
350,000
350,500 438,125 367,500
325,000
325,500 406,875 341,250
350,000
350,500 438,125 367,500
325,000
325,500 406,875 341,250
350,000
350,500 438,125 367,500
325,000
325,500 406,875 341,250
350,000
350,500 438,125 367,500
-
-
90,000 - 94,500
85,000 - 89,250
80,000 - 84,000
75,000 - 78,750
75,000 - 78,750
75,000 - 78,750
90,000 - 94,500
80,000 - 84,000
75,000 - 78,750
6,000 - 6,300
45,000 - 47,250
- -
keuntunga
n pembulatan
15%

235,463 235,400
277,725 277,700
313,950 313,900
253,575 253,500
301,875 301,800
350,175 350,100
241,500 241,500
470,925 470,900
519,225 519,200
597,713 597,700
239,085 239,000
601,335 601,300
410,550 410,500

295,838 295,800
543,375 543,300
392,438 392,400
368,288 368,200
784,875 784,800
664,125 664,100
664,125 664,100
295,838 295,800
917,700 917,700
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
1,026,375 1,026,300
1,267,875 1,267,800
1,026,375 1,026,300
1,267,875 1,267,800
1,026,375 1,026,300
1,539,563 1,539,500
1,026,375 1,026,300
108,675 108,600
138,863 138,800
66,413 66,400
422,625 422,600
513,188 513,100
483,000 483,000
615,825 615,800
694,313 694,300
784,875 784,800
851,288 851,200
633,938 633,900

392,438 392,400
422,625 422,600
392,438 392,400
422,625 422,600
392,438 392,400
422,625 422,600
392,438 392,400
422,625 422,600
392,438 392,400
422,625 422,600
392,438 392,400
422,625 422,600

108,675 108,600
102,638 102,600
96,600 96,600
90,563 90,500
90,563 90,500
90,563 90,500
108,675 108,600
96,600 96,600
90,563 90,500
7,245 7,200
54,338 54,300
- -
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

No. URAIAN KO HP KAP. HARGA


DE ALAT

1 ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 5,680,449,600


2 ASPHALT FINISHER E02 72.4 10.0 Ton 3,020,688,700
3 ASPHALT SPRAYER E03 4.0 850.0 Liter 80,514,700
4 BULLDOZER 100-150 HP E04 155.0 - - 1,143,330,700
5 COMPRESSOR 4000-6500 L\M E05 60.0 5,000.0 CPM/(L/m) 71,075,000
6 CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 132,403,600
7 CRANE 10-15 TON E07 138.0 15.0 Ton 451,992,800
8 DUMP TRUCK 3.5 TON E08 100.0 3.5 Ton 205,451,200
9 DUMP TRUCK 10 TON E09 190.0 10.0 Ton 256,536,400
10 EXCAVATOR 80-140 HP E10 133.0 0.9 M3 627,459,200
11 FLAT BED TRUCK 3-4 M3 E11 190.0 10.0 ton 169,314,000
12 GENERATOR SET E12 180.0 135.0 KVA 139,935,900
13 MOTOR GRADER >100 HP E13 135.0 10,800.0 - 1,750,861,200
14 TRACK LOADER 75-100 HP E14 70.0 0.8 M3 776,605,700
15 WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 619,268,600
16 THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 287,320,800
17 TANDEM ROLLER 6-8 T. E17 82.0 8.1 Ton 495,988,000
18 TIRE ROLLER 8-10 T. E18 100.5 9.0 Ton 719,630,800
19 VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 305,400,500
20 CONCRETE VIBRATOR E20 5.5 25.0 - 11,262,000
21 STONE CRUSHER E21 220.0 60.0 T/Jam 1,572,291,300
22 WATER PUMP 70-100 mm E22 6.0 - - 8,824,800
23 WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 174,444,700
24 PEDESTRIAN ROLLER E24 8.8 835.00 Ton 76,017,000
25 TAMPER E25 4.7 121.00 Ton 18,044,800
26 JACK HAMMER E26 0.0 1,330.00 - 54,416,800
27 FULVI MIXER E27 345.0 2,005.00 - 999,492,600
28 CONCRETE PUMP E28 100.0 8.00 M3 112,500,000
29 TRAILER 20 TON E29 175.0 20.00 Ton 600,000,000
30 PILE DRIVER + HAMMER E30 25.0 2.50 Ton 875,000,000
31 CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 850,000,000
32 WELDING SET E32 40.0 250.0 Amp 17,500,000
33 BORE PILE MACHINE E33 150.0 2,000.0 Meter 2,250,000,000
34 ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 15,000,000
35 TRONTON E35 150.0 15.0 Ton 450,000,000
36 COLD MILLING E36 248.0 1,000.0 m 4,945,000,000
37 ROCK DRILL BREAKER E37 3.0 - - 900,000,000
38 COLD RECYCLER E38 900.0 2,200.0 M 19,500,000,000
39 HOT RECYCLER E39 400.0 3.0 M 29,250,000,000
40 AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 395,000,000
41 ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 395,000,000
42 SLIP FORM PAVER E42 105.0 2.5 M 1,337,142,857
43 CONCRETE PAN MIXER E43 134.0 600.0 Liter 1,000,000,000
44 CONCRETE BREAKER E44 290.0 20.0 m3/jam 900,000,000
45 ASPAHLT TANKER E45 190.0 4,000.0 liter 500,000,000
46 CEMENT TANKER E46 190.0 4,000.0 liter 500,000,000
47 CONDRETE MIXER (350) E47 20.0 350.0 liter 35,000,000
48 VIBRATING RAMMER E48 4.2 80.0 KG 20,000,000
49 TRUK MIXER (AGITATOR) E49 220.0 5.0 M3 750,000,000
50 BORE PILE MACHINE E50 125.0 60.0 CM 1,170,000,000
51 CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 900,000,000
52 BLENDING EQUIPMENT E52 50.0 30.0 Ton 500,000,000
53 ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 15,000,000
54 BAR BENDER E53 3.0 0.0 0 100
55 BAR CUTTER E54 3.0 0.0 0 100
56 BREAKER E55 80.0 3.0 m3/jam 100
57 GROUTING PUMP E56 100.0 15.0 Ton 100
58 JACK HIDROLIC E57 3.0 150.0 Ton 100
59 MESIN LAS E58 3.0 0.2 Ton 100
60 PILE DRIVER LEADER, 75 kw E59 70.0 75.0 kw 100
61 PILE HAMMER E60 10.0 0.0 0 100
62 PILE HAMMER, 2,5 Ton E61 1.0 2.5 Ton 100
63 STRESSING JACK E62 89.0 15.0 Ton 100
64 WELDING MACHINE, 300 A E63 5.0 0.0 0 100
R JAM KERJA

BIAYA
SEWA KET.
ALAT/JAM
(di luar PPN)

7,339,424.25
1,164,517.80
60,059.30
590,899.99
160,704.31
143,685.27
401,060.07
270,187.81
459,750.96
430,818.26
440,042.29
413,624.04
688,616.90
339,905.23
355,781.52
199,676.97
300,233.17
387,360.25
257,168.24
45,224.08
827,951.02
40,375.61
263,181.61
65,278.91
46,830.36
38,260.24
1,387,472.42
247,453.78
498,458.28
273,128.29
452,201.61
109,038.57
796,454.26
39,592.46
536,862.69
1,656,982.02
302,943.94
6,235,469.32
7,449,568.27
535,273.80
365,795.18
538,328.04
648,672.00
826,054.41
544,670.95
507,070.95
78,353.04
46,638.76
630,593.44
650,271.55
624,927.27
226,121.24
108,822.46
21,700.75
21,700.75
184,204.31
223,764.31
31,898.31
33,254.35
164,424.29
50,264.36
27,942.29
202,006.31
35,854.29
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk


BAHAN PENGGANTUNG

Produk Belleza
1 Lockase Pintu Alluminium
Badan Swing Alluminium LC BZ 33-25
Lockset Swing Alluminium LC BZ 54-23
Lockset Sliding Alluminium LC BZ 55-23
2 Lockcase Besi
Badan Swing LC BZ 34-40
Badan Pelor LC BZ 37-40
Badan Sliding LC BZ 39-40
Badan Swing LC BZ 44-40 Eco Style
Badan Swing 5C611-40
Badan Pelor 5C621-40
3 Lockcase Stainless Steel
Badan Swing LC BZ 36-40
Badan Pelor LC BZ 38-60
Badan Pelor LC BZ 48-40 Eco Style
Lockset Swing LC BLZ 64-40 + DC
4 Double Cylinder
Double Cylinder DC BZ 20-07
Double Cylinder DC BZ 20-10
Double cylinder security DC BZ 0A-07
Double Cylinder DC BLZ 30-07
Double Cylinder 08800-07
Double Cylinder DC BZ 40-07 Eco Style
5 Knob Cylinder
Knob cylinder KC BZ 41-60K
6 WC Cylinder
WC Cylinder WC BZ 14-61
7 Padlock (Gembok)
Padlock GMB BZ 270-40
Padlock GMB BZ 270-50
Padlock GMB BZ 270-60
Padlock GMB BZ 270-40 L
Padlock GMB BZ 270-50 L
Padlock GMB BZ 270-60 L
Padlock GMB BZ 150-40
Padlock GMB BZ 150-50
Padlock GMB BZ 150-60
Padlock GMB BZ 150-50 MK 3
Padlock GMB BZ 150-50 MK 5
Padlock GMB BZ 160-40
Padlock GMB BZ 160-50
Padlock GMB BZ 160-60
Padlock GMB BZ 160-50 MK 3
Padlock GMB BZ 160-50 MK 5
Padlock GMB BZ 170-40
Padlock GMB BZ 170-50
Padlock GMB BZ 170-60
Padlock GMB BZ 170-70
Padlock GMB BZ 170-50 MK 3
Padlock GMB BZ 170-50 MK 5
Padlock GMB BZ 214 Nomor
Padlock GMB BZ 174-30
Padlock GMB BZ 174-40
Padlock GMB BZ 174-50
Padlock GMB BZ 174-60
Padlock GMB BZ 174-50 MK3
Barrel Lock GMB BZ 274-40
Barrel Lock GMB BZ 274-50
Barrel Lock GMB BZ 274-60
Padlock GMB BZ 077-30 Fai Viro
Padlock GMB BZ 077-30 L Fai Viro
Padlock GMB BZ 077-40 Fai Viro
Padlock GMB BZ 077-40 L Fai Viro
Padlock GMB BZ 077-50 Fai Viro
Padlock GMB BZ 077-50 L Fai Viro
Padlock GMB BZ 077-60 Fai Viro
Padlock GMB BZ 077-70 Fai Viro
Padlock GMB BZ 719 Nomor
Padlock GMB BZ 331 Nomor
Padlock GMB BZ 177-50 Fai Viro
Padlock GMB BZ 177-60 Fai Viro
Padlock GMB BZ 177-70 Fai Viro
Padlock GMB BZ 177-90 Fai Viro
Padlock GMB BZ 177-91 Fai Viro
Padlock 21010-50
Padlock 21010-60
8 Pull Handle
Pull Handle P.278.01BZ
Pull Handle P.278.02BZ
Pull Handle P.278.03BZ
Pull Handle P.278.04BZ
Pull Handle P.278.05BZ
Pull Handle P.278.06BZ
Pull Handle P.278.07BZ
Pull Handle P.278.08BZ
Pull Handle P.278.09BZ
Pull Handle P.278.10BZ
Pull Handle P.278.11BZ
Pull Handle P.278.12BZ
Pull Handle P.278.14BZ
Pull Handle P.278.15BZ
Pull Handle P.278.16BZ
Pull Handle P.278.17BZ
Pull Handle P.278.18BZ
Pull Handle P.278.19BZ
Pull Handle P.278.20BZ
Pull Handle P.278.21BZ
Pull Handle P.278.22BZ
Pull Handle P.278.25BZ
Pull Handle P.278.27BZ
Pull Handle P.278.32BZ
Pull Handle P.278.34BZ
Pull Handle P.278.35BZ
Pull Handle P.278.36BZ
Pull Handle P.278.37BZ
Pull Handle P.278.38BZ
Pull Handle P.278.40BZ
Pull Handle P.278.41BZ
Pull Handle P.278.42BZ
Pull Handle P.278.43BZ
Pull Handle P.278.45BZ
Pull Handle P.278.48BZ
Pull Handle P.278.52BZ
Pull Handle P.278.53BZ
Pull Handle P.278.54BZ
Pull Handle P.278.55BZ
Pull Handle P.278.56BZ
Pull Handle P.278.57BZ
Pull Handle P.278.58BZ
Pull Handle P.278.59BZ
Pull Handle P.278.60BZ
Pull Handle P.278.61BZ
Pull Handle P.278.62BZ
Pull Handle P.278.63BZ
Pull Handle P.278.64BZ
Pull Handle P.278.65BZ
Pull Handle P.278.66BZ
Pull Handle P.278.67BZ
Pull Handle P.278.68BZ
Pull Handle P.278.69BZ
Pull Handle P.278.70BZ
Pull Handle P.278.71BZ
Pull Handle P.278.72BZ
Pull Handle P.278.73BZ
Pull Handle P.278.74BZ
Pull Handle P.458.03BZ
Pull Handle P.458.04BZ
Pull Handle P.458.05BZ (45 cm)
Pull Handle P.458.05BZ (60 cm)
Pull Handle P.458.06BZ (45 cm)
Pull Handle P.458.06BZ (60 cm)
Pull Handle P.458.07BZ (45 cm)
Pull Handle P.458.07BZ (60 cm)
Pull Handle P.458.08BZ (60 cm)
Pull Handle P.458.09BZ (45 cm)
Pull Handle P.458.09BZ (60 cm)
Pull Handle P.968.03BZ (30 cm)
Pull Handle PR.278.13BZ
Pull Handle PR.858.37BZ
9 Glass Handle
Pull Handle P.278.29BZ ø25x350mm
10 Shower Handle
Pull Handle P.278.30BZ ø25x500/200mm
11 Flush Handle
Flush Handle FPP.278.01 BZ
Flush Handle FPP.858.01 BZ
Flush Handle FPP.858.02 BZ
Flush Handle FPP.268.01 BZ
12 Escutcheon
Escutcheon E.858,01 BZ
Escutcheon E.858,02 BZ
Escutcheon E.858,37 BZ
13 Lever Handle (HP)
Lever Handle (HP) HP.127 BZ (01-08)
Lever Handle (HP) HP.858.19 BZ
Lever Handle (HP) HP.858.28 BZ
Lever Handle (HP) HP.858.30 BZ
Lever Handle (HP) HP.858.31 BZ
Lever Handle (HP) HP.858.33 BZ
Lever Handle (HP) HP.858.42 BZ
Lever Handle (HP) HP.858.43 BZ
Lever Handle (HP) HP.858.44 BZ
Lever Handle (HP) HP.858.45 BZ
Lever Handle (HP) HP.858.46 BZ
Lever Handle (HP) HP.859 BZ Eco Style (01-11)
14 Handle On Rose (HRE)
Lever Handle HRE.268 BZ (01-04)
Lever Handle HRE.278 BZ (01-03)
Lever Handle HRE.748.01 BZ
Lever Handle HRE.748.02 BZ
Lever Handle HRE.748.03 BZ
Lever Handle HRE.748.04 BZ
Lever Handle HRE.858.01 BZ
Lever Handle HRE.858.02 BZ
Lever Handle HRE.858.04 BZ
Lever Handle HRE.858.05 BZ
Lever Handle HRE.858.14 BZ
Lever Handle HRE.858.19 BZ
Lever Handle HRE.858.21 BZ
Lever Handle HRE.858.23 BZ
Lever Handle HRE.858.35 BZ
Lever Handle HRE.858.36 BZ
Lever Handle HRE.858.51 BZ
Lever Handle HRE.858.56 BZ
Lever Handle HRE.858.57 BZ
Lever Handle HRE.858.58 BZ
Lever Handle HRE.858.59 BZ
Lever Handle HRE.858.60 BZ
Lever Handle HRE.858.61 BZ
Lever Handle HRE.858.62 BZ
Lever Handle HRE.858.63 BZ
Lever Handle HRE.858.64 BZ
Lever Handle HRE.858.65 BZ
Lever Handle HRE.859 BZ Eco Style (01-09)
Lever Handle HREO.858.01 BZ (01-03)
15 Cylinder Lockset
Cylinder Bathroom CYL BZ 601X300
Cylinder Entrance CYL BZ 601X400
Cylinder Bathroom CYL BZ 601X302
Cylinder Entrance CYL BZ 601X402
16 Handle Set
Handle Set HPS.127 Set (001-008)
Handle Set HPS.128 Set (001-008)
Handle Set HPS.185 Set (001-008)
17 Door Closer & Floor Hinge
Door Closer HO 45711 BZ
Door Closer 45712 BZ-SA
Door Closer 45712 BZ-RA
Floor Hinge FH 84 BZ
18 Engsel Stainless Steel
Engsel Stainless Steel SEL BZ07 3X2,5X2,5 2BB
Engsel Stainless Steel SEL BZ08 4X3X3 4BB
Engsel Stainless Steel SEL BZ09 5X3X3 4BB
Engsel Eco Style SEL BZ11 3X2,5X2MM 2BB
Engsel Eco Style SEL BZ13 4X3X2MM 4BB
Engsel Eco Style SEL BZ15 5X3X3MM 4BB
Engsel Stainless Steel SEL BZ21 3X2,5 2BB Slim Line
Engsel Stainless Steel SEL BZ23 4X3 4BB Slim Line
Engsel Stainless Steel SEL BZ25 5X3 4BB Slim Line
Engsel Stainless Steel SEL BZ31 3X2,5X2,5MM 2BB NRP
Engsel Stainless Steel SEL BZ33 4X3X3MM 4BB NRP
Engsel Stainless Steel SEL BZ35 5X3X3MM 4BB NRP
19 Engsel Besi
Engsel Steel SEL BZ55 3X2,5X2,5MM 2BB
Engsel Steel SEL BZ56 4X3X3.0MM 4BB
Engsel Steel SEL BZ57 5X3X3.0MM 4BB
20 Engsel Lainnya
Centre Pivot CPH-BZ851
Engsel Salon SLN-BZ851
Engsel Sendok SDK-BZ271
21 Engsel Casement
Casement CMT-BZ01 08"
Casement CMT-BZ01 12"
Casement CMT-BZ01 16"
Casement CMT-BZ01 20"
22 Grendel Lain-lain
Grendel GRD-BZ851 2"
Grendel GRD-BZ851 3"
Grendel GRD-BZ271 3"
Grendel GRD-BZ272 3"
Grendel GRD-BZ273 3"
Grendel GRD-BZ274 4"
Grendel GRD-BZ275 3"
Grendel GRD-BZ276
Grendel GRD-BZ277
Grendel GRD-BZ278 2"
Grendel GRD-BZ279 4"
Grendel Tanam GT-BZ851 6"
Grendel Tanam GT-BZ851 12"
Grendel Tanam GT-BZ126 8"
Grendel Tanam GT-BZ126 12"
Grendel Tanam GT-BZ271 6"
Grendel Rantai GR-BZ851
Grendel WC GW-BZ601
Grendel WC GW-BZ271
Kunci Kaca KKC BZ271
Door Guard DG-BZ851
Door Guard DG-BZ272
Door Viewer DV-BZ851
D. Proof Strike DPS-BZ851
Roller Catch RC-BZ271
Kunci Laci KL-BZ271
Push Lock PL-BZ271
Cam Lock CL-BZ271
Security Bolt SB-BZ278
23 Aksesoris Jendela
Ramskar RS-BZ851
Ramskar RS-BZ852
Ramskar RS-BZ853
Hak Angin HA-BZ851
Hak Angin HA-BZ852
Hak Angin HA-BZ271 10"
Hak Angin HA-BZ272 10"
Rambuncis RMB-BZ852
Rambuncis RMB-BZ853
Rambuncis RMB-BZ271
Rambuncis RMB-BZ272
Spring Knip SK-BZ851
Spring Knip SK-BZ852
Spring Knip SK-BZ853
Spring Knip SK-BZ854
24 Door Stop
Door Stop STP-BZ851
Door Stop STP-BZ852
Door Stop STP-BZ854
Door Stop STP-BZ271
Door Stop STP-BZ272
Door Stop STP-BZ273
Door Stop STP-BZ274
Door Stop STP-BZ277
Door Stop STP-BZ278
Door Stop STP-BZ279
25 Patch Fitting
Patch Fitting PT 2210BZ
Patch Fitting PT 2220BZ
Patch Fitting PT 2221BZ
Patch Fitting PT 2230BZ
Patch Fitting PT 2240BZ
Patch Fitting US 2210BZ
Shower Hinge GW E 451 900BZ
Shower Hinge E 452 1800BZ
26 Sliding Set
Sliding Set P-BZ85 2M
Sliding Set P-BZ885 1,8M

Banyuwangi, 2017

CV. /UD. ……..………………

(…………………………………)
Direktur
GUNAN

Harga
Satuan
usulan 2019

15% 10%

Buah 91,000 72,000 82,800 91,080 91,000


Set 83,000 66,000 75,900 83,490 83,000
Set 83,000 66,000 75,900 83,490 83,000

Buah 97,000 77,000 88,550 97,405 97,000


Buah 97,000 77,000 88,550 97,405 97,000
Buah 77,000 61,000 70,150 77,165 77,000
Buah 77,000 61,000 70,150 77,165 77,000
Buah 244,000 193,000 221,950 244,145 244,000
Buah 244,000 193,000 221,950 244,145 244,000

Buah 125,000 99,000 113,850 125,235 125,000


Buah 195,000 154,000 177,100 194,810 195,000
Buah 97,000 77,000 88,550 97,405 97,000
Set 99,000 78,000 89,700 98,670 99,000

Buah 91,000 72,000 82,800 91,080 91,000


Buah 119,000 94,000 108,100 118,910 119,000
Buah 147,000 116,000 133,400 146,740 147,000
Buah 28,000 22,000 25,300 27,830 28,000
Buah 209,000 165,000 189,750 208,725 209,000
Buah 77,000 61,000 70,150 77,165 77,000

Buah 125,000 99,000 113,850 125,235 125,000

Buah 119,000 94,000 108,100 118,910 119,000

Buah 54,000 43,000 49,450 54,395 54,000


Buah 65,000 51,000 58,650 64,515 65,000
Buah 75,000 59,000 67,850 74,635 75,000
Buah 59,000 47,000 54,050 59,455 59,000
Buah 67,000 53,000 60,950 67,045 67,000
Buah 76,000 60,000 69,000 75,900 76,000
Buah 62,000 49,000 56,350 61,985 62,000
Buah 78,000 62,000 71,300 78,430 78,000
Buah 91,000 72,000 82,800 91,080 91,000
Set 233,000 184,000 211,600 232,760 233,000
Set 390,000 308,000 354,200 389,620 390,000
Buah 51,000 40,000 46,000 50,600 51,000
Buah 65,000 51,000 58,650 64,515 65,000
Buah 75,000 59,000 67,850 74,635 75,000
Set 186,000 147,000 169,050 185,955 186,000
Set 311,000 246,000 282,900 311,190 311,000
Buah 54,000 43,000 49,450 54,395 54,000
Buah 62,000 49,000 56,350 61,985 62,000
Buah 75,000 59,000 67,850 74,635 75,000
Buah 94,000 74,000 85,100 93,610 94,000
Set 197,000 156,000 179,400 197,340 197,000
Set 326,000 258,000 296,700 326,370 326,000
Buah 52,000 41,000 47,150 51,865 52,000
Buah 65,000 51,000 58,650 64,515 65,000
Buah 86,000 68,000 78,200 86,020 86,000
Buah 129,000 102,000 117,300 129,030 129,000
Buah 178,000 141,000 162,150 178,365 178,000
Set 421,000 333,000 382,950 421,245 421,000
Buah 121,000 96,000 110,400 121,440 121,000
Buah 151,000 119,000 136,850 150,535 151,000
Buah 214,000 169,000 194,350 213,785 214,000
Buah 121,000 96,000 110,400 121,440 121,000
Buah 156,000 123,000 141,450 155,595 156,000
Buah 135,000 107,000 123,050 135,355 135,000
Buah 178,000 141,000 162,150 178,365 178,000
Buah 197,000 156,000 179,400 197,340 197,000
Buah 257,000 203,000 233,450 256,795 257,000
Buah 267,000 211,000 242,650 266,915 267,000
Buah 407,000 322,000 370,300 407,330 407,000
Buah 121,000 96,000 110,400 121,440 121,000
Buah 121,000 96,000 110,400 121,440 121,000
Buah 292,000 231,000 265,650 292,215 292,000
Buah 335,000 265,000 304,750 335,225 335,000
Buah 441,000 349,000 401,350 441,485 441,000
Buah 528,000 417,000 479,550 527,505 528,000
Buah 818,000 647,000 744,050 818,455 818,000
Buah 285,000 225,000 258,750 284,625 285,000
Buah 342,000 270,000 310,500 341,550 342,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 221,000 175,000 201,250 221,375 221,000
Psg 221,000 175,000 201,250 221,375 221,000
Psg 171,000 135,000 155,250 170,775 171,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 221,000 175,000 201,250 221,375 221,000
Psg 221,000 175,000 201,250 221,375 221,000
Psg 221,000 175,000 201,250 221,375 221,000
Psg 249,000 197,000 226,550 249,205 249,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 371,000 293,000 336,950 370,645 371,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 249,000 197,000 226,550 249,205 249,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 249,000 197,000 226,550 249,205 249,000
Psg 249,000 197,000 226,550 249,205 249,000
Psg 357,000 282,000 324,300 356,730 357,000
Psg 428,000 338,000 388,700 427,570 428,000
Psg 357,000 282,000 324,300 356,730 357,000
Psg 428,000 338,000 388,700 427,570 428,000
Psg 428,000 338,000 388,700 427,570 428,000
Psg 171,000 135,000 155,250 170,775 171,000
Psg 171,000 135,000 155,250 170,775 171,000
Psg 171,000 135,000 155,250 170,775 171,000
Psg 171,000 135,000 155,250 170,775 171,000
Psg 214,000 169,000 194,350 213,785 214,000
Psg 214,000 169,000 194,350 213,785 214,000
Psg 228,000 180,000 207,000 227,700 228,000
Psg 228,000 180,000 207,000 227,700 228,000
Psg 228,000 180,000 207,000 227,700 228,000
Psg 228,000 180,000 207,000 227,700 228,000
Psg 271,000 214,000 246,100 270,710 271,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 271,000 214,000 246,100 270,710 271,000
Psg 271,000 214,000 246,100 270,710 271,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 349,000 276,000 317,400 349,140 349,000
Psg 562,000 444,000 510,600 561,660 562,000
Psg 562,000 444,000 510,600 561,660 562,000
Psg 249,000 197,000 226,550 249,205 249,000
Psg 314,000 248,000 285,200 313,720 314,000
Psg 314,000 248,000 285,200 313,720 314,000
Psg 349,000 276,000 317,400 349,140 349,000
Psg 349,000 276,000 317,400 349,140 349,000
Psg 428,000 338,000 388,700 427,570 428,000
Psg 428,000 338,000 388,700 427,570 428,000
Psg 314,000 248,000 285,200 313,720 314,000
Psg 349,000 276,000 317,400 349,140 349,000
Psg 278,000 220,000 253,000 278,300 278,000
Psg 100,000 79,000 90,850 99,935 100,000
Psg 200,000 158,000 181,700 199,870 200,000

Psg 200,000 158,000 181,700 199,870 200,000

Set 207,000 164,000 188,600 207,460 207,000

Psg 95,000 75,000 86,250 94,875 95,000


Psg 110,000 87,000 100,050 110,055 110,000
Psg 110,000 87,000 100,050 110,055 110,000
Psg 221,000 175,000 201,250 221,375 221,000

Psg 38,000 30,000 34,500 37,950 38,000


Psg 82,000 65,000 74,750 82,225 82,000
Psg 29,000 23,000 26,450 29,095 29,000
Psg 94,000 74,000 85,100 93,610 94,000
Psg 314,000 248,000 285,200 313,720 314,000
Psg 314,000 248,000 285,200 313,720 314,000
Psg 100,000 79,000 90,850 99,935 100,000
Psg 186,000 147,000 169,050 185,955 186,000
Psg 186,000 147,000 169,050 185,955 186,000
Psg 157,000 124,000 142,600 156,860 157,000
Psg 186,000 147,000 169,050 185,955 186,000
Psg 157,000 124,000 142,600 156,860 157,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 200,000 158,000 181,700 199,870 200,000
Psg 135,000 107,000 123,050 135,355 135,000

Psg 228,000 180,000 207,000 227,700 228,000


Psg 371,000 293,000 336,950 370,645 371,000
Psg 214,000 169,000 194,350 213,785 214,000
Psg 214,000 169,000 194,350 213,785 214,000
Psg 228,000 180,000 207,000 227,700 228,000
Psg 228,000 180,000 207,000 227,700 228,000
Psg 186,000 147,000 169,050 185,955 186,000
Psg 186,000 147,000 169,050 185,955 186,000
Psg 228,000 180,000 207,000 227,700 228,000
Psg 228,000 180,000 207,000 227,700 228,000
Psg 271,000 214,000 246,100 270,710 271,000
Psg 292,000 231,000 265,650 292,215 292,000
Psg 292,000 231,000 265,650 292,215 292,000
Psg 285,000 225,000 258,750 284,625 285,000
Psg 264,000 209,000 240,350 264,385 264,000
Psg 264,000 209,000 240,350 264,385 264,000
Psg 271,000 214,000 246,100 270,710 271,000
Psg 186,000 147,000 169,050 185,955 186,000
Psg 186,000 147,000 169,050 185,955 186,000
Psg 186,000 147,000 169,050 185,955 186,000
Psg 271,000 214,000 246,100 270,710 271,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 292,000 231,000 265,650 292,215 292,000
Psg 292,000 231,000 265,650 292,215 292,000
Psg 178,000 141,000 162,150 178,365 178,000
Psg 164,000 130,000 149,500 164,450 164,000
Set 78,000 62,000 71,300 78,430 78,000
Set 108,000 85,000 97,750 107,525 108,000
Set 164,000 130,000 149,500 164,450 164,000
Set 171,000 135,000 155,250 170,775 171,000

Set 192,000 152,000 174,800 192,280 192,000


Set 178,000 141,000 162,150 178,365 178,000
Set 178,000 141,000 162,150 178,365 178,000

Buah 306,000 242,000 278,300 306,130 306,000


Buah 328,000 259,000 297,850 327,635 328,000
Buah 314,000 248,000 285,200 313,720 314,000
Buah 1,089,000 861,000 990,150 1,089,165 1,089,000

Psg 63,000 50,000 57,500 63,250 63,000


Psg 97,000 77,000 88,550 97,405 97,000
Psg 119,000 94,000 108,100 118,910 119,000
Psg 47,000 37,000 42,550 46,805 47,000
Psg 56,000 44,000 50,600 55,660 56,000
Psg 78,000 62,000 71,300 78,430 78,000
Psg 35,000 28,000 32,200 35,420 35,000
Psg 42,000 33,000 37,950 41,745 42,000
Psg 66,000 52,000 59,800 65,780 66,000
Psg 91,000 72,000 82,800 91,080 91,000
Psg 137,000 108,000 124,200 136,620 137,000
Psg 167,000 132,000 151,800 166,980 167,000

Psg 35,000 28,000 32,200 35,420 35,000


Psg 52,000 41,000 47,150 51,865 52,000
Psg 56,000 44,000 50,600 55,660 56,000

Psg 164,000 130,000 149,500 164,450 164,000


Psg 28,000 22,000 25,300 27,830 28,000
Psg 34,000 27,000 31,050 34,155 34,000

Psg 57,000 45,000 51,750 56,925 57,000


Psg 71,000 56,000 64,400 70,840 71,000
Psg 102,000 81,000 93,150 102,465 102,000
Psg 159,000 126,000 144,900 159,390 159,000

Buah 30,000 24,000 27,600 30,360 30,000


Buah 34,000 27,000 31,050 34,155 34,000
Buah 18,000 14,000 16,100 17,710 18,000
Buah 28,000 22,000 25,300 27,830 28,000
Buah 43,000 34,000 39,100 43,010 43,000
Buah 30,000 24,000 27,600 30,360 30,000
Buah 40,000 32,000 36,800 40,480 40,000
Buah 29,000 23,000 26,450 29,095 29,000
Buah 22,000 17,000 19,550 21,505 22,000
Buah 40,000 32,000 36,800 40,480 40,000
Buah 28,000 22,000 25,300 27,830 28,000
Buah 76,000 60,000 69,000 75,900 76,000
Buah 135,000 107,000 123,050 135,355 135,000
Buah 78,000 62,000 71,300 78,430 78,000
Buah 94,000 74,000 85,100 93,610 94,000
Buah 51,000 40,000 46,000 50,600 51,000
Buah 67,000 53,000 60,950 67,045 67,000
Set 121,000 96,000 110,400 121,440 121,000
Buah 62,000 49,000 56,350 61,985 62,000
Buah 29,000 23,000 26,450 29,095 29,000
Buah 65,000 51,000 58,650 64,515 65,000
Buah 86,000 68,000 78,200 86,020 86,000
Buah 51,000 40,000 46,000 50,600 51,000
Buah 37,000 29,000 33,350 36,685 37,000
Buah 52,000 41,000 47,150 51,865 52,000
Buah 28,000 22,000 25,300 27,830 28,000
Buah 23,000 18,000 20,700 22,770 23,000
Buah 23,000 18,000 20,700 22,770 23,000
Buah 62,000 49,000 56,350 61,985 62,000

Buah 40,000 32,000 36,800 40,480 40,000


Buah 56,000 44,000 50,600 55,660 56,000
Buah 76,000 60,000 69,000 75,900 76,000
Buah 32,000 25,000 28,750 31,625 32,000
Buah 30,000 24,000 27,600 30,360 30,000
Buah 75,000 59,000 67,850 74,635 75,000
Buah 78,000 62,000 71,300 78,430 78,000
Buah 52,000 41,000 47,150 51,865 52,000
Buah 43,000 34,000 39,100 43,010 43,000
Buah 71,000 56,000 64,400 70,840 71,000
Buah 57,000 45,000 51,750 56,925 57,000
Buah 29,000 23,000 26,450 29,095 29,000
Buah 29,000 23,000 26,450 29,095 29,000
Buah 38,000 30,000 34,500 37,950 38,000
Buah 38,000 30,000 34,500 37,950 38,000
Buah 56,000 44,000 50,600 55,660 56,000
Buah 32,000 25,000 28,750 31,625 32,000
Buah 30,000 24,000 27,600 30,360 30,000
Buah 121,000 96,000 110,400 121,440 121,000
Buah 86,000 68,000 78,200 86,020 86,000
Buah 57,000 45,000 51,750 56,925 57,000
Buah 40,000 32,000 36,800 40,480 40,000
Buah 135,000 107,000 123,050 135,355 135,000
Buah 100,000 79,000 90,850 99,935 100,000
Buah 100,000 79,000 90,850 99,935 100,000

Buah 151,000 119,000 136,850 150,535 151,000


Buah 151,000 119,000 136,850 150,535 151,000
Buah 51,000 40,000 46,000 50,600 51,000
Buah 151,000 119,000 136,850 150,535 151,000
Buah 243,000 192,000 220,800 242,880 243,000
Buah 243,000 192,000 220,800 242,880 243,000
Psg 606,000 479,000 550,850 605,935 606,000
Psg 961,000 760,000 874,000 961,400 961,000

Buah 612,000 484,000 556,600 612,260 612,000


Buah 363,000 287,000 330,050 363,055 363,000

2017
DAFTAR SURVEY HARGA BAHAN BANGUNAN
SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk

BATU ALAM
1 Batu Andesit Polos 10/20
2 Batu Andesit Polos 15/30
3 Batu Andesit Polos 20/40
4 Batu Andesit Ulir 10/20
5 Batu Andesit Ulir 15/30
6 Batu Andesit Ulir 20/40
7 Batu Candi Polos 10/20
8 Batu Candi Polos 15/30
9 Batu Candi Polos 20/40
10 Batu Candi Ulir 10/20
11 Batu Candi Ulir 15/30
12 Batu Candi Ulir 20/40
14 Bata Merah
15 Batako 36 x 20 x 10
16 Koral Sikat
17 Bata Ringan 60x20x8
18 Bata Ringan 60x20x9
19 Bata Ringan 60x20x10
20 Batu Raen
21 Batu paras
22 Batu alam/ palimanan
25 Batu Lempeng
26 Batu Lempeng Acak
33 Koral tebar
VEY HARGA BAHAN BANGUNAN

Harga
Satuan
2018

m² 84,300
m² 113,000
m² 126,500
m² 115,000
m² 138,000
m² 149,500
m² 86,200
m² 99,600
m² 118,800
m² 100,600
m² 117,800
m² 132,200
bh 750
bh 3,400
zak 51,700
bh 15,000
bh 11,200
bh 23,800
m3 316,000
m² 80,500
m² 103,500
m² 43,100
m² 40,200
zak 31,600
DAFTAR SURVEY HARGA BAHAN BANGUNAN
SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk Satuan

BAHAN PASANGAN
1 Semen Bosowa 50 kg Bosowa zak
2 Semen Bosowa 40 kg zak
3 Semen Gresik 40 kg zak
4 Semen Tiga Roda 50 kg Tiga roda zak
5 Semen Tiga Roda 40 kg zak
6 Semen PC kg
7 Semen putih 3 roda kg
8 Semen warna MU kg
9 Mortar plester + acian 40 kg MU-200 zak
10 Perekat Bata Ringan 40 kg MU-380 zak
11 Perekat keramik dinding 25 kg MU-400 zak
Perekat keramik dinding 25 kg MU-420 zak
12 Perekat keramik lantai 40 kg MU-450 zak
13 Perekat keramik basah 25 kg MU-460 zak
14 Pelapis kedap air 30 kg MU-700 zak
15 Perbaikan muka beton 40 kg MU-830 zak
16 Finish coat repair 25 kg MU-840 zak
VEY HARGA BAHAN BANGUNAN

Harga
2018

59,800
53,400
54,600
56,500
48,500

100,000
14,000
191,300
181,100
42,200

247,500
529,400
1,304,700
317,500
392,400
DAFTAR SURVEY HARGA BAHAN BANGUNAN
SUMBER DATA :
KABUPATEN / KOTA : BANYUWANGI

No Jenis Pekerjaan Merk Satuan

LEVERANSIR
1 Batu gunung m3
2 Batu pecah 1 - 2 (mesin) m3
3 Batu pecah 2 - 3 (mesin) m3
4 Batu pecah 3 - 5 m3
5 Batu pecah 5 - 7 m3
Batu pecah kg
6 Batu Belah 15/20 m3
7 Batu krukul m3
8 Batu rejeng ( dinding ) m3
9 Pasir beton m3
10 Pasir pasang m3
11 Pasir urug m3
12 Sirtu m3
13 Tanah urug m3
14 Tasirtu m3
RVEY HARGA BAHAN BANGUNAN

Harga
2018

105,000
345,000
333,500
299,000
287,500
235
120,100
258,750

230,000
185,000
150,000
115,000
97,750
172,500
KABUPATEN / KOTA : BANYUWANGI

No Jenis Pekerjaan Merk Satuan

PAKU
1 Paku kayu 2-3 cm ( paku plafond eternit, triplek) Kg
Paku kayu 4-5 cm (paku reng) Kg
Paku kayu 7 cm (paku usuk) Kg
Paku kayu 10 cm (usuk,kuda-kuda) Kg
2 Paku beton 2,5-3 cm (paku usuk/kuda2) Kotak(50 biji)
Paku beton 4-7 cm Kotak(50 biji)
Paku beton 10-12,5 cm Kotak(50 biji)
3 Paku payung 5 cm ( asbes gelombang kecil ) Kg
Paku payung 7 cm ( asbes gelombang kecil ) Kg
Paku payung 10 cm ( asbes gelombang besar ) Kg
4 Paku skrup 8x3 Kotak(144biji)
Paku skrup 6x2 Kotak(144biji)
Paku skrup 6x1 Kotak(144biji)
Paku skrup 6x1 1/2 cm Kotak(144biji)
Paku skrup bh
15 Paku pancing Kg
Paku rivet 423 Biji
Paku rivet 537 Biji
Drewel putih 6 x 3/4 Biji
Harga
2018

19,200
17,600
16,800
20,100
16,600
32,700
43,100
46,000
30,700
39,100
66,700
30,400
10,900
21,800

22,350
125
250
125
DAFTAR SURVEY HARGA BAHAN BANGUNAN
SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk


BAHAN PENUTUP LANGIT-LANGIT / PLAFON
PLAFON
1 Kalsi Rata 3 (100x100) tebal 3 Kalsi
Kalsi Rata 3 (100x50) tebal 3 Kalsi
Kalsi Rata 3 (200x100) tebal 3 Kalsi
Kalsi Rata 3 (100x50) tebal 3 Kalsi
2 Kalsiboard Ling 3.5 (244x122) tebal 3.5 Kalsi
Kalsiboard Ling 3.5 (240x120) tebal 3.5 Kalsi
3 Kalsiboard Ling 4 (244x122) tebal 4 Kalsi
Kalsiboard Ling 4 (240x120) tebal 4 Kalsi
4 Kalsiboard Ling 4.5 (244x122) tebal 4.5 Kalsi
Kalsiboard Ling 4.5 (240x120) tebal 4.5 Kalsi
5 Kalsiboard Ling 6 (244x122) tebal 6 Kalsi
Kalsiboard Ling 6 (240x120) tebal 6 Kalsi
Kalsiboard Ling 6 (270x120) tebal 6 Kalsi
Kalsiboard Ling 6 (300x120) tebal 6 Kalsi
PLINTH
6 Kalsiplinth 8 (300x10) tebal 8 Kalsi
SLIDING PLANK
7 Kalsiplank 8 (300x20) tebal 8 Kalsi
Kalsiplank 8 (300x30) tebal 9 Kalsi
8 Kalsiplank 8 Jati (300x20) tebal 8 Kalsi
Kalsiplank 8 Jati (300x30) tebal 8 Kalsi
9 Kalsiplank 9 (400x20) tebal 9 Kalsi
Kalsiplank 9 - Cedar (400x20) tebal 9 Kalsi
Kalsiplank 10 - IL (300x20) tebal 10 Kalsi
Kalsiplank 10 - Jati - IL (300x20) tebal 10 Kalsi
Kalsiplank 10 - Meranti- IL (300x20) tebal 10 Kalsi
10 LISPLANK
Kalsiplank 12 - Fascia (300x15) tebal 12 Kalsi
11 DEK LANTAI
Kalsidesk 20 - Meranti (240x20) tebal 20 Kalsi
Kalsidesk 20 - Meranti - VL (240x20) tebal 20 Kalsi
12 PARTISI
Kalsipart 8 (240x122) tebal 8 Kalsi
Kalsipart 8 (240x120) tebal 8 Kalsi
Kalsipart 8 (270x120) tebal 8 Kalsi
Kalsipart 8 (300x120) tebal 8 Kalsi
13 PARTISI BASAH
Kalsiqua 8 (240x120) tebal 8 Kalsi
14 DINDING LUAR
Kalsiclad 10 (244x122) tebal 10 Kalsi
Kalsiclad 10 (240x120) tebal 10 Kalsi
Kalsiclad 10 (270x120) tebal 10 Kalsi
Kalsiclad 12 (244x122) tebal 12 Kalsi
Kalsiclad 12 (240x120) tebal 12 Kalsi
Kalsiclad 12 (270x120) tebal 12 Kalsi
Kalsiclad 12 (300x120) tebal 12 Kalsi
15 LANTAI
Kalsifloor 20 (240x120) tebal 20 Kalsi

AKSESORIS
1 PLAFON
Profil universal
Join clip
metal angle
L-Bracket
Paku spesial untuk ketebalan 3-4,5 mm
Skrup 2 cm #6 x 3/4 inch untuk ketebalan 4 & 4,5 mm
Skrup 2 cm #6 x 3/4 inch untuk ketebalan 6 mm
2 PARTISI
Metal track
Metal stud
3 PARTISI,PLANK DINDING LUAR
Skrup 2,5 cm #6 x 1 inch untuk ketebalan 8-12 mm
4 LANTAI
Skrup 3,7 cm #10 x 1 ,5 inch untuk ketebalan 20 mm
5 INTERIOR
Isolasi penguat 50 mm x 50 m
Kompon multiguna 20 kg
Kompon khusus 20 kg
6 EKSTERIOR
Sikaflex 600 ml (MI)

Gypsumboard (120x240) 9 mm Knauf


Kalsiboard (120x240) 3,5 mm
Kalsiboard (120x240) 8 mm Kalsi
GRC board (120x240) 4 mm Versaboard
GRC board (120x240) 9 mm Versaboard
Kalsiplank polos 20x300x8 mm Kalsi
Kalsiplank motif 20x300x8 mm Kalsi
Kalsiplank polos 30x300x8 mm Kalsi
Kalsi floor 120x240x20 mm Kalsi
Alluminium foll 60m/roll
Triplek Albasia 122x244 tebal 4
Triplek Albasia 122x244 tebal 9
Triplek Albasia 122x244 tebal 12
Triplek Albasia 122x244 tebal 18
Triplek Sengon (bekisting) 122x244 tebal 4
Triplek Sengon (bekisting) 122x244 tebal 5
Triplek Sengon (bekisting) 122x244 tebal 8
Triplek Sengon (bekisting) 122x244 tebal 9
Triplek Sengon (bekisting) 122x244 tebal 12
Triplek Sengon (bekisting) 122x244 tebal 15
Triplek Sengon (bekisting) 122x244 tebal 18
Hardplek meranti 122x244 tebal 3
Hardplek meranti 122x244 tebal 4
Hardplek meranti 122x244 tebal 5
Hardplek meranti 122x244 tebal 9
Hardplek meranti 122x244 tebal 12
Hardplek meranti 122x244 tebal 15
Hardplek meranti 122x244 tebal 18
Triplek MDF 122x244 tebal 5
Triplek MDF 122x244 tebal 9
Triplek MDF 122x244 tebal 12
Triplek MDF 122x244 tebal 15
Triplek MDF 122x244 tebal 18
Teakwood 122x244 tebal 3 kw 1
Teakwood 122x244 tebal 3 kw 2
Rockwool
Density 60 kg/m2
Density 80 kg/m2
Density 100 kg/m2
Glasswool
Density 16 kg/m2
Density 24 kg/m2
Density 32 kg/m2

Wallpaper
Wallpaper classic 1 roll ( 10 m x 0,50 m )
Wallpaper minimalis 1 roll ( 10 m x 0,50 m )
Wallpaper korea 1 roll ( 10 m x 0,50 m )
Wallpaper standart (biasa) 1 roll ( 10 m x 0,50 m )
Wallpaper standart 1 roll ( 10 m x 0,50 m )
Lem wallpaper
Lem wallpaper

HPL (1,22x2,44)
HPL ( matte n texture ) (pearl white)
(blanc white)
(cream almond)
(tangerine yellow)
(cayenne grey)
HPL Natural Beech
Hpl Eksklusif Taco
HPL ( Glossy n special finish ) (milky white)
(allegro white)
(onyx black with film)
(Murcielago Yellow with film)
(Saleen Yellow with film)
(Vodka Silver with film)
(Greek’s Wall with film)
HPL ( Plain ) (Sand)
(Milk Painted)
HPL ( Tropical taste ) (Brunswick)
HPL ( Special touch ) (Mozaic Walnut embosed)
HPL ( Timerland ) (Maple Leaf)
HPL ( Bosque ) (Cuban Tobacco)
HPL ( Exoticsm ) (Munich Elm)
Lem Hpl 1 (Quickcure)
Lem Hpl 2 Fox 168
Lem Hpl 3 Superbond
Lem Lantai Vynil (Quickcure)
Lem Karpet (Quickcure)
Lem Lantai kayu (Quickcure)

Err:509
List plafond gypsum profil besar
List plafond gypsum profil kecil
RVEY HARGA BAHAN BANGUNAN

Harga
Satuan
2018

lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr

3m

3m
3m
3m
3m
4m
3m
3m
3m
3m

3m

lmbr
lmbr

lmbr
lmbr
lmbr
lmbr

lmbr

lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr

lmbr

btg
bh
btg
bh
3000 bh/dos
1857 bh/dos
1800 bh/dos

btg
btg

1800 bh/dos

1000 bh/dos

roll
zak
zak

bh

lbr 71,800
lbr 70,800
lbr 175,300
m' 65,500
m' 151,800
3m 48,300
3m 57,500
3m 66,100
lbr 632,500
roll
lbr 77,000
lbr 132,200
lbr 178,200
lbr 241,500
lbr 69,000
lbr 115,700
lbr 195,500
lbr 267,300
lbr -
lbr -
lbr -
lbr
lbr 60,900
lbr 98,900
lbr 172,500
lbr 207,000
lbr 258,700
lbr
lbr 115,000
lbr 178,200
lbr 207,000
lbr
lbr
lbr 132,200
lbr

lbr 69,000
lbr 80,500
lbr 97,700

roll 362,200
roll 506,000
roll 609,500

roll 193,200
roll 265,700
roll 726,900
roll 90,500
roll 345,000
/250gr 51,700
kg 206,800

Lembar 108,600
Lembar 105,000
Lembar 124,300
Lembar 156,900
Lembar 124,300
Lembar 220,300
Lembar 810,700
Lembar 108,600
Lembar 105,000
Lembar 141,200
Lembar 144,900
Lembar 169,000
Lembar 386,400
Lembar 241,500
Lembar 124,300
Lembar 214,900
Lembar 132,800
Lembar 144,900
Lembar 132,800
Lembar 132,800
Lembar 132,800
kg 152,500
kg 104,200
kg 56,400
kg 152,500
kg 152,500
kg 152,500

m' 11,500
m' 8,050
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN / KOTA : BANYUWANGI

No Jenis Pekerjaan Merk Satuan


BAHAN KAYU
1 Kayu bekisting m³
2 Kayu balau (balok) m³
Kayu balau (usuk/reng) m³
3 Kayu bengkirai (usuk/reng) m³
Kayu bengkirai (balok) m³
Kayu bengkirai (papan) m³
4 Kayu jati balok 8/12, 6/12,8/15 m³
Kayu jati papan 2/20 x 2 m m³
Kayu jati reng 2/3, 3/5 m³
Kayu jati usuk 5/7, 4/6, 3/5 m³
5 Kayu kamper (balok) 6/12 m³
Kayu kamper (balok) 8/12 m³
Kayu kamper (balok) 8/15 m³
Kayu kamper (usuk) 3/5 m³
Kayu kamper (usuk) 4/6 m³
Kayu kamper (usuk) 5/7 m³
Kayu kamper (reng) 2/3, 3/5 m³
Kayu kamper (papan) 2/20 x 4 m m³
Kayu kamper (papan) 3/30 x 4 m m³
6 Kayu kruing (balok) 6/12 m³
Kayu kruing (balok) 8/12 m³
Kayu kruing (balok) 8/15 m³
Kayu kruing (usuk) 3/5 m³
Kayu kruing (usuk) 4/6 m³
Kayu kruing (usuk) 5/7 m³
Kayu kruing (reng) 2/3, 3/5 m³
Kayu kruing (papan) 2/20 x 4 m m³
Kayu kruing (papan) 3/30 x 4 m m³
7 Kayu lokal usuk 4/6 m³
Kayu lokal usuk 5/7 m³
Kayu lokal reng 2/3, 3/5 x 2 m m³
Kayu lokal papan 2/20 x 4 m m³
8 Kayu meranti balok 6/12 m³
Kayu meranti balok 8/12 m³
Kayu meranti balok 8/15 m³
Kayu meranti usuk 3/5 m³
Kayu meranti usuk 4/6 m³
Kayu meranti usuk 5/7 m³
Kayu meranti reng 2/3, 3/5 m³
Kayu meranti papan 2/20 x 4 m m³
Kayu meranti papan 3/30 x 4 m m³
10 List kayu 2/4 kamper m³
List kayu propil m'
11 Kayu Ulin (Balok) m³
Kayu Ulin (Papan) m³
12 Trucuk / bambu bh
13 Bambu wuluh/ bambu umbul-umbul diameter 3-5 cm diawetkan p=5-6 m /btg
Bambu apus diameter 5-7 cm diawetkan p=5-6 m /btg
Bambu petung diameter 10-14 cm diawetkan p=5-6 m /btg
14 Tali ijuk m'
Y HARGA BAHAN BANGUNAN

Harga
2018

3,090,150
10,925,000
9,200,000
9,200,000
12,075,000
12,650,000
19,951,000
19,083,000
17,834,000
14,746,000
9,775,000
9,775,000
9,775,000
6,900,000
8,050,000
8,050,000
6,900,000
10,925,000
11,500,000
8,050,000
8,050,000
8,050,000
5,750,000
6,900,000
6,900,000
5,750,000
9,200,000
9,775,000
3,450,000
3,450,000
2,645,000
4,945,000
5,750,000
5,750,000
5,750,000
5,750,000
4,600,000
5,175,000
5,175,000
5,750,000
6,325,000
6,023,850
12,900
17,000,000
17,500,000
14,375
KABUPATEN

No Jenis Pekerjaan

1 LED TUBE ECOFIT 8W


2 LED TUBE ECOFIT 16W
3 LED BULB 3-25W E27
4 LED BULB 4-40W E27
5 LED BULB 4-40W E27
6 LED BULB 5-50W E27
7 LED BULB 6-60W E27
8 LED BULB 6,5-60W E27
9 LED BULB 8-70W E27
10 LED BULB 10-85W E27
11 LED BULB 10,5-85W E27
12 LED BULB 12-100W E27
13 LED BULB 13-100W E27
14 LED BULB 14-120W E27
15 LED BULB 14,5-120W E27
16 LED BULB 19-160W E27
17 LED BULB 27-200W E27
18 Essensial LED MR 16 3W-35W 2700K/4000K 12V 24D
19 Essensial LED MR 16 5W-50W 2700K/4000K 12V 24D

1 Reccesed Horisontal Downlight 4" c/w E27


BPL 13W/PLC 10W/865/827/G24d
2 Reccesed Horisontal Downlight 5" c/w E27
BPL 13W/PLC 10W/13W/865/827/G24d
3 Reccesed Horisontal Downlight 6" c/w E27
BPL 18W/PLC 18W/865/827/G24d
4 Reccesed Horisontal Downlight 6" c/w E27
BPL 2x18W/PLC 2x18W/865/827/G24d
5 LAMPU BARET c/w TL-E 22W set
6 LAMPU BARET c/w TL-E 32W set
7 Downlight 4" c/w LED BULB 4-40W / E27
8 Downlight 4" c/w LED BULB 7-60W / E27
9 Downlight 5" c/w LED BULB 4-40W / E27
10 Downlight 5" c/w LED BULB 7-60W / E27
11 Downlight 6" c/w LED BULB 7-60W / E27
12 Downlight 6" c/w LED BULB 9-70W / E27
13 Downlight 4" c/w Essensial 8W / E27 + Kaca
14 Downlight 4" c/w Essensial 11W / E27 + Kaca
15 Downlight 5" c/w Essensial 11W / E27 + Kaca
16 Downlight 5" c/w Essensial 14W / E27 + Kaca
17 High Bay 15" c/w SON E 250W/E40 set Trafo
18 High Bay 15" c/w HPI-Plus 250W/E40 set Trafo
19 Downlight Halogen c/w Ess.LED 4-35W MR16 24D Set Transformer
20 Downlight Halogen c/w Ess.LED 6,5-50W MR16 24D/36D Set Transforme
21 RM Outbow c/w 2x18W Komponen Philips EBC-54
22 RM Outbow c/w 2x36W Komponen Philips EBC-54
23 RM Outbow c/w 2x14W Komponen Philips EBC-54
24 RM Outbow c/w 2x28W Komponen Philips EBC-54
25 RM c/w 2x14W Komponen Philips EBC-54
26 RM c/w 2x28W Komponen Philips EBC-54
27 RM c/w 2x18W Komponen Philips EBC-54
28 RM c/w 2x36W Komponen Philips EBC-54
29 Balk c/w 1x18W Komponen Philips EBC-54
30 Balk c/w 1x36W Komponen Philips EBC-54
31 Balk V c/w 2x18W Komponen Philips EBC-54
32 Balk V c/w 2x36W Komponen Philips EBC-54
33 TK c/w 1x18W Komponen Philips EBC-54
34 TK c/w 1x36W Komponen Philips EBC-54
35 TKIU c/w 2x18W Komponen Philips EBC-54
36 TKIU c/w 2x36W Komponen Philips EBC-54
37 Cable Tray uk. 100x50x2400 Type U Finishing OCP
38 Cable Tray uk. 100x50x2400 Type U Finishing Hotdip
39 Cable Tray uk. 100x100x2400 Type U Finishing OCP
40 Cable Tray uk. 100x100x2400 Type U Finishing Hotdip
41 Cable Tray uk. 200x50x2400 Type U Finishing OCP
42 Cable Tray uk. 200x50x2400 Type U Finishing Hotdip
43 Cable Tray uk. 200x100x2400 Type U Finishing OCP
44 Cable Tray uk. 200x100x2400 Type U Finishing Hotdip
45 Cable Tray uk. 300x50x2400 Type U Finishing OCP
46 Cable Tray uk. 300x50x2400 Type U Finishing Hotdip
47 Cable Tray uk. 300x100x2400 Type U Finishing OCP
48 Cable Tray uk. 300x100x2400 Type U Finishing Hotdip
49 Cable Tray uk. 100x50x2400 Type C Finishing OCP
50 Cable Tray uk. 100x50x2400 Type C Finishing Hotdip
51 Cable Tray uk. 100x100x2400 Type C Finishing OCP
52 Cable Tray uk. 100x100x2400 Type C Finishing Hotdip
53 Cable Tray uk. 200x50x2400 Type C Finishing OCP
54 Cable Tray uk. 200x50x2400 Type C Finishing Hotdip
55 Cable Tray uk. 200x100x2400 Type C Finishing OCP
56 Cable Tray uk. 200x100x2400 Type C Finishing Hotdip
57 Cable Tray uk. 300x50x2400 Type C Finishing OCP
58 Cable Tray uk. 300x50x2400 Type C Finishing Hotdip
59 Cable Tray uk. 300x100x2400 Type C Finishing OCP
60 Cable Tray uk. 300x100x2400 Type C Finishing Hotdip
61 Join Tray
62 Pipa BSP ø 1/2" Tebal 2,2 mm MED SNI
63 Pipa GSP ø 1/2" Tebal 2,2 mm MED SNI
64 Pipa BSP ø 3/4" Tebal 2,2 mm MED SNI
65 Pipa GSP ø 3/4" Tebal 2,2 mm MED SNI
66 Pipa BSP ø 1" Tebal 2,8 mm MED SNI
67 Pipa GSP ø 1" Tebal 2,8 mm MED SNI
68 Pipa BSP ø 1-1/4" Tebal 2,9 mm MED SNI
69 Pipa GSP ø 1-1/4" Tebal 2,9 mm MED SNI
70 Pipa BSP ø 1-1/2" Tebal 2,9 mm MED SNI
71 Pipa GSP ø 1-1/2" Tebal 2,9 mm MED SNI
72 Pipa BSP ø 2" Tebal 3,2 mm MED SNI
73 Pipa GSP ø 2" Tebal 3,2 mm MED SNI
74 Pipa BSP ø 2-1/2" Tebal 3,2 mm MED SNI
75 Pipa GSP ø 2-1/2" Tebal 3,2 mm MED SNI
76 Pipa BSP ø 3" Tebal 3,6 mm MED SNI
77 Pipa GSP ø 3" Tebal 3,6 mm MED SNI
78 Pipa BSP ø 4" Tebal 4,1 mm MED SNI
79 Pipa GSP ø 4" Tebal 4,1 mm MED SNI
80 Pipa BSP ø 5" Tebal 4,5 mm MED SNI
81 Pipa GSP ø 5" Tebal 4,5 mm MED SNI
82 Pipa BSP ø 6" Tebal 4,5 mm MED SNI
83 Pipa GSP ø 6" Tebal 4,5 mm MED SNI
84 Pipa BSP ø 8" Tebal 6,3 mm MED SNI
85 Pipa GSP ø 8" Tebal 6,3 mm MED SNI
86 Pipa BSP ø 1/2" Tebal 2,6 mm SCH 40
87 Pipa GSP ø 1/2" Tebal 2,6 mm SCH 40
88 Pipa BSP ø 3/4" Tebal 2,6 mm SCH 40
89 Pipa GSP ø 3/4" Tebal 2,6 mm SCH 40
90 Pipa BSP ø 1" Tebal 3,3 mm SCH 40
91 Pipa GSP ø 1" Tebal 3,3 mm SCH 40
92 Pipa BSP ø 1-1/4" Tebal 3,3 mm SCH 40
93 Pipa GSP ø 1-1/4" Tebal 3,3 mm SCH 40
94 Pipa BSP ø 1-1/2" Tebal 3,3 mm SCH 40
95 Pipa GSP ø 1-1/2" Tebal 3,3 mm SCH 40
96 Pipa BSP ø 2" Tebal 3,7 mm SCH 40
97 Pipa GSP ø 2" Tebal 3,7 mm SCH 40
98 Pipa BSP ø 2-1/2" Tebal 4,8 mm SCH 40
99 Pipa GSP ø 2-1/2" Tebal 4,8 mm SCH 40
100 Pipa BSP ø 3" Tebal 5,3 mm SCH 40
101 Pipa GSP ø 3" Tebal 5,3 mm SCH 40
102 Pipa BSP ø 4" Tebal 5,8 mm SCH 40
103 Pipa GSP ø 4" Tebal 5,8 mm SCH 40
104 Pipa BSP ø 5" Tebal 6 mm SCH 40
105 Pipa GSP ø 5" Tebal 6 mm SCH 40
106 Pipa BSP ø 6" Tebal 6,7 mm SCH 40
107 Pipa GSP ø 6" Tebal 6,7 mm SCH 40
108 Pipa BSP ø 8" Tebal 7,7 mm SCH 40
109 Pipa GSP ø 8" Tebal 7,7 mm SCH 40
: BANYUWANGI

Harga PRICE LIST + 15%


Merk Satuan
(Rp.) +PPN

PHILIPS pcs 45,000 43,350 39,015 44,867


PHILIPS pcs 58,000 56,100 50,490 58,064
PHILIPS pcs 23,000 22,050 19,845 22,822
PHILIPS pcs 27,000 26,550 23,895 27,479
PHILIPS pcs 31,000 29,700 26,730 30,740
PHILIPS pcs 30,000 28,800 25,920 29,808
PHILIPS pcs 36,000 34,650 31,185 35,863
PHILIPS pcs 36,000 34,650 31,185 35,863
PHILIPS pcs 41,000 39,600 35,640 40,986
PHILIPS pcs 46,000 44,100 39,690 45,644
PHILIPS pcs 44,000 42,750 38,475 44,246
PHILIPS pcs 56,000 54,000 48,600 55,890
PHILIPS pcs 54,000 52,200 46,980 54,027
PHILIPS pcs 61,000 58,500 52,650 60,548
PHILIPS pcs 59,000 56,700 51,030 58,685
PHILIPS pcs 84,000 81,450 73,305 84,301
PHILIPS pcs 103,000 99,900 89,910 103,397
PHILIPS pcs 40,000 38,250 34,425 39,589
PHILIPS pcs 45,000 43,350 39,015 44,867

Saka set 253,782 220,680 253,782

Saka set 276,759 240,660 276,759

Saka set 299,736 260,640 299,736

Saka set 439,565 382,230 439,565

Saka set 384,813 334,620 384,813


Saka set 513,153 446,220 513,153
Saka set 199,134 173,160 199,134
Saka set 244,157 212,310 244,157
Saka set 215,694 187,560 215,694
Saka set 260,613 226,620 260,613
Saka set 262,683 228,420 262,683
Saka set 307,602 267,480 307,602
Saka set 218,385 189,900 218,385
Saka set 227,493 197,820 227,493
Saka set 249,746 217,170 249,746
Saka set 252,747 219,780 252,747
Saka set 1,617,188 1,406,250 ###
Saka set 1,869,107 1,625,310 ###
Saka set 252,333 219,420 252,333
Saka set 274,689 238,860 274,689
Saka set 708,561 616,140 708,561
Saka set 1,064,291 925,470 ###
Saka set 894,240 777,600 894,240
Saka set 1,126,805 979,830 ###
Saka set 814,959 708,660 814,959
Saka set 1,028,790 894,600 ###
Saka set 616,032 535,680 616,032
Saka set 926,429 805,590 926,429
Saka set 226,044 196,560 226,044
Saka set 310,500 270,000 310,500
Saka set 366,287 318,510 366,287
Saka set 469,269 408,060 469,269
Saka set 273,137 237,510 273,137
Saka set 399,200 347,130 399,200
Saka set 479,205 416,700 479,205
Saka set 681,237 592,380 681,237
HR btg 111,550 97,000 111,550
HR btg 187,795 163,300 187,795
HR btg 167,210 145,400 167,210
HR btg 281,635 244,900 281,635
HR btg 167,210 145,400 167,210
HR btg 281,635 244,900 281,635
HR btg 222,985 193,900 222,985
HR btg 375,475 326,500 375,475
HR btg 222,985 193,900 222,985
HR btg 375,475 326,500 375,475
HR btg 278,760 242,400 278,760
HR btg 469,315 408,100 469,315
HR btg 123,050 107,000 123,050
HR btg 199,295 173,300 199,295
HR btg 178,710 155,400 178,710
HR btg 293,135 254,900 293,135
HR btg 178,710 155,400 178,710
HR btg 293,135 254,900 293,135
HR btg 234,485 203,900 234,485
HR btg 386,975 336,500 386,975
HR btg 234,485 203,900 234,485
HR btg 386,975 336,500 386,975
HR btg 290,260 252,400 290,260
HR btg 480,815 418,100 480,815
HR set 17,250 15,000 17,250
btg 172,027 149,589 172,027
243,070 211,365 243,070
221,097 192,258 221,097
312,404 271,656 312,404
339,159 294,921 339,159
479,081 416,592 479,081
447,544 389,169 447,544
632,437 549,945 632,437
514,374 447,282 514,374
726,591 631,818 726,591
701,658 610,137 701,658
991,406 862,092 991,406
895,089 778,338 895,089
1,264,532 1,099,593 ###
1,156,033 1,005,246 ###
1,633,520 1,420,452 ###
1,673,823 1,455,498 ###
2,365,006 2,056,527 ###
2,252,750 1,958,913 ###
3,182,904 2,767,743 ###
2,681,964 2,332,143 ###
3,789,156 3,294,918 ###
4,756,767 4,136,319 ###
6,709,636 5,834,466 ###
179,200 155,826 179,200
251,609 218,790 251,609
237,833 206,811 237,833
334,150 290,565 334,150
352,480 306,504 352,480
494,906 430,353 494,906
481,130 418,374 481,130
675,700 587,565 675,700
571,755 497,178 571,755
803,098 698,346 803,098
763,706 664,092 763,706
1,072,695 932,778 ###
1,216,715 1,058,013 ###
1,708,661 1,485,792 ###
1,587,069 1,380,060 ###
2,229,183 1,938,420 ###
2,257,190 1,962,774 ###
3,170,039 2,756,556 ###
3,054,140 2,655,774 ###
4,289,640 3,730,122 ###
3,947,976 3,433,023 ###
5,544,950 4,821,696 ###
6,033,822 5,246,802 ###
8,521,434 7,409,943 ###
45,000
58,000
23,000
27,000
31,000
30,000
36,000
36,000
41,000
46,000
44,000
56,000
54,000
61,000
59,000
84,000
103,000
40,000
45,000
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk Satuan

KACA
1 Kaca polos 3 mm m²
Kaca polos 5 mm m²
Kaca polos 8 mm m²
2 Kaca es/buram 5 mm m²
Kaca es/buram 8 mm m²
3 Kaca rayban 5 mm m²
4 Kaca cermin 5 mm m²
5 Kaca Tempered 8 mm m²
Kaca Tempered 10 mm m²
Kaca Tempered 12 mm m²
Kaca Tempered 15 mm m²
6 Sandblast polos m²
Sandblast motif cutting m²
7 Stiker one way polos m²
Stiker one way printing m²
8 Kubikel kaca m²
9 Phenolic 180x180 Lembar
Phenolic 60x180 Lembar
Kubikel phenolic + acc + ongkos pasang unit
10 Akrilik bening tebal 5 mm m²
Akrilik putih susu tebal 5 mm m²
11 Kaca film m²
12 Kaca bening/polos naco 60x20x5 bh
RVEY HARGA BAHAN BANGUNAN

Harga
2018

120,700
116,900
169,600

100,600
189,700
437,000
465,700
523,200
2,378,700
143,700

402,500
575,000
63,200
33,300
KABUPATEN

No Jenis Pekerjaan

1 Conbloc 4 uk. 10,5x21x6cm


Conbloc 4 uk. 10,5x21x6cm
Conbloc 4 uk. 10,5x21x6cm
2 Conbloc 4 uk. 10,5x21x6cm plus
Conbloc 4 uk. 10,5x21x6cm plus
Conbloc 4 uk. 10,5x21x6cm plus
Conbloc 4 uk. 10,5x21x8cm
Conbloc 4 uk. 10,5x21x8cm
Conbloc 4 uk. 10,5x21x8cm
Conbloc 4 uk. 10,5x21x10cm
Conbloc 4 uk. 10,5x21x10cm
Conbloc 4 uk. 10,5x21x10cm
Conbloc 16 uk. 11,5x22,5x6cm
Conbloc 16 uk. 11,5x22,5x6cm
Conbloc 16 uk. 11,5x22,5x6cm
Conbloc 16 uk. 11,5x22,5x8cm
Conbloc 16 uk. 11,5x22,5x8cm
Conbloc 16 uk. 11,5x22,5x8cm
Dikformat 16 uk. 7x21x8cm
Dikformat 16 uk. 7x21x8cm
Dikformat 16 uk. 7x21x8cm
Veta uk. 10,5x10,5x6cm
Veta uk. 10,5x10,5x6cm
Veta uk. 10,5x10,5x6cm
Veta uk. 10,5x10,5x8cm
Veta uk. 10,5x10,5x8cm
Veta uk. 10,5x10,5x8cm
Munich uk. 9x22,5x13,5x8cm
Munich uk. 9x22,5x13,5x8cm
Munich uk. 9x22,5x13,5x8cm
Roma uk. 16x20x6cm
Roma uk. 16x20x6cm
Roma uk. 16x20x6cm
Roma uk. 16x20x8cm
Roma uk. 16x20x8cm
Roma uk. 16x20x8cm
Zurich uk. 21,9x6,5x6cm
Zurich uk. 21,9x6,5x6cm
Zurich uk. 21,9x6,5x6cm
Zurich uk. 21,9x6,5x8cm
Zurich uk. 21,9x6,5x8cm
Zurich uk. 21,9x6,5x8cm
Topi Uskup uk. 21x30x6x6cm
Topi Uskup uk. 21x30x6x6cm
Topi Uskup uk. 21x30x6x6cm
Topi Uskup uk. 21x30x6x8cm
Topi Uskup uk. 21x30x6x8cm
Topi Uskup uk. 21x30x6x8cm
Milan uk. 20x11,5x11,5x6cm
Milan uk. 20x11,5x11,5x6cm
Milan uk. 20x11,5x11,5x6cm
Cobblestone 21 uk. 21x121x6cm
Cobblestone 21 uk. 21x121x6cm
Cobblestone 21 uk. 21x121x6cm
Cobblestone 21 uk. 21x21x8cm
Cobblestone 21 uk. 21x21x8cm
Cobblestone 21 uk. 21x21x8cm
Cobblestone 31 uk. 31x31x8cm
Cobblestone 31 uk. 31x31x8cm
Cobblestone 31 uk. 31x31x8cm
Vienna uk. 21x21x6cm
Vienna uk. 21x21x6cm
Vienna uk. 21x21x6cm
Vienna uk. 21x21x8cm
Vienna uk. 21x21x8cm
Vienna uk. 21x21x8cm
Classico 6A uk. 11,8x12,8x6cm
Classico 6A uk. 11,8x12,8x6cm
Classico 6A uk. 11,8x12,8x6cm
Classico 6B uk. Radius 5,5 dia. 11cm
Classico 6B uk. Radius 5,5 dia. 11cm
Classico 6B uk. Radius 5,5 dia. 11cm
Classico 6C uk.11,8x10,5x6cm
Classico 6C uk.11,8x10,5x6cm
Classico 6C uk.11,8x10,5x6cm
Classico 6D uk.11,8x11,8x6cm
Classico 6D uk.11,8x11,8x6cm
Classico 6D uk.11,8x11,8x6cm
Classico 6E uk.11,8x5,8x6cm
Classico 6E uk.11,8x5,8x6cm
Classico 6E uk.11,8x5,8x6cm
Classico 8A uk.11,5x8,5x6,5x8cm
Classico 8A uk.11,5x8,5x6,5x8cm
Classico 8A uk.11,5x8,5x6,5x8cm
Classico 8B (Octagon) uk.6,5x6,5x8cm
Classico 8B (Octagon) uk.6,5x6,5x8cm
Classico 8B (Octagon) uk.6,5x6,5x8cm
Classico 8C uk.11,5x11,5x6,5x8cm
Classico 8C uk.11,5x11,5x6,5x8cm
Classico 8C uk.11,5x11,5x6,5x8cm
Classico 8D uk.11,5x11,5x8cm
Classico 8D uk.11,5x11,5x8cm
Classico 8D uk.11,5x11,5x8cm
Segmento tebal 8cm
Classico 8D uk.11,5x11,5x8cm
Classico 8D uk.11,5x11,5x8cm

1 Constone & Conslab


Brindlestone (Constone) Uk. 20 x 40 x 5 cm
Brindlestone (Constone) Uk. 40 x 40 x 5 cm
Brindlestone (Constone) Uk. 60 x 40 x 5 cm
Slate Stone (Constone) Uk. 20 x 40 x 5 cm
Slate Stone (Constone) Uk. 40 x 40 x 5 cm
Slate Stone (Constone) Uk. 60 x 40 x 5 cm
Slate Stone (Constone) Uk. 20 x 40 x 5 cm
Slate Stone (Constone) Uk. 40 x 40 x 5 cm
Slate Stone (Constone) Uk. 60 x 40 x 5 cm
Slate Stone (Constone) Uk. 20 x 40 x 5 cm
Slate Stone (Constone) Uk. 40 x 40 x 5 cm
Slate Stone (Constone) Uk. 60 x 40 x 5 cm
Tactile Difable (Dot) Uk. 30 x 30 x 5 cm
Tactile Difable (Dot) Uk. 30 x 30 x 5 cm
2 Conpave
Conpave Viena Uk. 21 x 21 x 6 cm
Conpave Viena Uk. 21 x 21 x 6 cm
Conpave Viena Uk. 21 x 21 x 8 cm
Conpave Viena Uk. 21 x 21 x 8 cm
Conpave Veta Uk. 10,5 x 10,5 x 6 cm
Conpave Veta Uk. 10,5 x 10,5 x 6 cm
Conpave Veta Uk. 10,5 x 10,5 x 8 cm
Conpave Veta Uk. 10,5 x 10,5 x 8 cm
Conpave Torino Uk. 21 x 10,5 x 6 cm
Conpave Torino Uk. 21 x 10,5 x 6 cm
Conpave Torino Uk. 21 x 10,5 x 8 cm
Conpave Torino Uk. 21 x 10,5 x 8 cm
Conpave Verona Uk. 21 x 21 x 6 cm
Conpave Verona Uk. 21 x 21 x 6 cm
Conpave Verona Uk. 21 x 21 x 8 cm
Conpave Verona Uk. 21 x 21 x 8 cm
Conpave Toscana Uk. 31,5 x 31,5 x 8 cm
Conpave Toscana Uk. 31,5 x 31,5 x 8 cm
3 Ecobloc
Grassbloc tebal 8 cm
Grassbloc tebal 10 cm
Grasstone tebal 8 cm
Grasstone tebal 8 cm
Grasstone tebal 8 cm
Footprint tebal 8 cm
Footprint tebal 8 cm
Footprint tebal 8 cm

Kanstien 10.61 (jepit)


kanstien 15 x 25 x 20 (tahu)
kanstien 15 x 25 x 40 (tahu)
Kanstien 15 x 30 x 20 (DKI)
Kanstien 15 x 30 x 40 (DKI)
Kanstien 15 x 30 x 60 (DKI)
Kanstien 15 x 30 x 80 (DKI)
Kanstien 19 x 20 x 20 (KAPUK)
Kanstien 19 x 20 x 40 (KAPUK)
Kanstien 19 x 20 x 80 (KAPUK)
Kanstien BCD
Kanstien 15 x 15 x 50 (Car Stopper)
Kanstien Pilar
Mulut Air Kanstien 19 x 20 x 40 (Kapuk)
Tali air A40
Tali air A20
Mulut air kotak C
mulut air kotak D
Mulut air BSD
Mulut air MAP
Mulut Air Kanstien 15 x 25 x 40 (tahu)
Mulut air kanstien 15 x 25 x 40 (DKI)

Full Component uk. 380 x 200 x 320


Full Component uk. 380 x 200 x 300
Tapered full component uk. 380 x 200 x 320
Tapered full component uk. 380 x 200 x 300
Tapered Half High Component uk. 380 x 200 x 310
Tapered Half High Component uk. 380 x 200 x 300
Cap uk. 95 x 440 x 260
: BANYUWANGI

Harga PRICE LIST


Merk Satuan
(Rp.)

berat 3 kg warna abu-abu m2(45/m2) 192,000 151,500


berat 3 kg warna merah/kuning/hitam/klasik m2(45/m2) 223,000 176,500
berat 3 kg warna Hijau m2(45/m2) 244,000 193,000
berat 3 kg warna abu-abu m2(45/m2) 199,000 157,000
berat 3 kg warna merah/kuning/hitam/klasik m2(45/m2) 226,000 179,000
berat 3 kg warna Hijau m2(45/m2) 250,000 198,000
berat 4 kg warna abu-abu m2(45/m2) 223,000 176,000
berat 4 kg warna merah/kuning/hitam/klasik m2(45/m2) 255,000 201,500
berat 4 kg warna Hijau m2(45/m2) 283,000 223,500
berat 5 kg warna abu-abu m2(45/m2) 287,000 227,000
berat 5 kg warna merah/kuning/hitam/klasik m2(45/m2) 323,000 255,000
berat 5 kg warna Hijau m2(45/m2) 367,000 290,000
berat 3,5 kg warna abu-abu m2(40/m2) 197,000 156,000
berat 3,5 kg warna merah/kuning/hitam/klasik m2(40/m2) 224,000 177,000
berat 3,5 kg warna Hijau m2(40/m2) 250,000 198,000
berat 4,5 kg warna abu-abu m2(40/m2) 230,000 181,500
berat 4,5 kg warna merah/kuning/hitam/klasik m2(40/m2) 262,000 207,000
berat 4,5 kg warna Hijau m2(40/m2) 288,000 227,500
berat 2,7 kg warna abu-abu m2(66/m2) 235,000 186,000
berat 2,7 kg warna merah/kuning/hitam/klasik m2(66/m2) 266,000 210,000
berat 2,7 kg warna Hijau m2(66/m2) 293,000 232,000
berat 1,5 kg warna abu-abu m2(90/m2) 193,000 152,500
berat 1,5 kg warna merah/kuning/hitam/klasik m2(90/m2) 226,000 179,000
berat 1,5 kg warna Hijau m2(90/m2) 250,000 198,000
berat 2 kg warna abu-abu m2(90/m2) 225,000 177,500
berat 2 kg warna merah/kuning/hitam/klasik m2(90/m2) 259,000 205,000
berat 2 kg warna Hijau m2(90/m2) 288,000 227,500
berat 4,3 kg warna abu-abu m2(39/m2) 235,000 186,000
berat 4,3 kg warna merah/kuning/hitam/klasik m2(39/m2) 266,000 210,000
berat 4,3 kg warna Hijau m2(39/m2) 293,000 232,000
berat 3,6 kg warna abu-abu m2(35/m2) 195,000 154,000
berat 3,6 kg warna merah/kuning/hitam/klasik m2(35/m2) 221,000 175,000
berat 3,6 kg warna Hijau m2(35/m2) 240,000 190,000
berat 5 kg warna abu-abu m2(35/m2) 232,000 183,500
berat 5 kg warna merah/kuning/hitam/klasik m2(35/m2) 259,000 204,500
berat 5 kg warna Hijau m2(35/m2) 278,000 220,000
berat 4,5 kg warna abu-abu m2(30/m2) 202,000 159,500
berat 4,5 kg warna merah/kuning/hitam/klasik m2(30/m2) 233,000 184,000
berat 4,5 kg warna Hijau m2(30/m2) 256,000 202,500
berat 5,5 kg warna abu-abu m2(30/m2) 235,000 186,000
berat 5,5 kg warna merah/kuning/hitam/klasik m2(30/m2) 267,000 211,000
berat 5,5 kg warna Hijau m2(30/m2) 293,000 232,000
berat 5,5 kg warna abu-abu m2(25/m2) 204,000 161,000
berat 5,5 kg warna merah/kuning/hitam/klasik m2(25/m2) 236,000 186,500
berat 5,5 kg warna Hijau m2(25/m2) 251,000 198,500
berat 7,3 kg warna abu-abu m2(25/m2) 235,000 186,000
berat 7,3 kg warna merah/kuning/hitam/klasik m2(25/m2) 276,000 218,500
berat 7,3 kg warna Hijau m2(25/m2) 287,000 227,000
berat 4,7 kg warna abu-abu m2(29/m2) 196,000 155,000
berat 4,7 kg warna merah/kuning/hitam/klasik m2(29/m2) 225,000 178,000
berat 4,7 kg warna Hijau m2(29/m2) 256,000 202,500
berat 5,8 kg warna abu-abu m2(22,5/m2) 197,000 156,000
berat 5,8 kg warna merah/kuning/hitam/klasik m2(22,5/m2) 224,000 177,000
berat 5,8 kg warna Hijau m2(22,5/m2) 250,000 198,000
berat 7,7 kg warna abu-abu m2(22,5/m2) 234,000 185,000
berat 7,7 kg warna merah/kuning/hitam/klasik m2(22,5/m2) 262,000 207,000
berat 7,7 kg warna Hijau m2(22,5/m2) 288,000 227,500
berat 17,5 kg warna abu-abu m2(10/m2) 235,000 186,000
berat 17,5 kg warna merah/kuning/hitam/klasik m2(10/m2) 267,000 211,000
berat 17,5 kg warna Hijau m2(10/m2) 293,000 232,000
berat 5,6 kg warna abu-abu m2(24/m2) 198,000 156,500
berat 5,6 kg warna merah/kuning/hitam/klasik m2(24/m2) 228,000 180,000
berat 5,6 kg warna Hijau m2(24/m2) 250,000 198,000
berat 7,5 kg warna abu-abu m2(24/m2) 230,000 181,500
berat 7,5 kg warna merah/kuning/hitam/klasik m2(24/m2) 261,000 206,000
berat 7,5 kg warna Hijau m2(24/m2) 288,000 227,500
berat 1,5 kg warna abu-abu m2(83/m2) 224,000 177,000
berat 1,5 kg warna merah/kuning/hitam/klasik m2(83/m2) 252,000 199,000
berat 1,5 kg warna Hijau m2(83/m2) 285,000 225,000
berat 1,5 kg warna abu-abu m2(107/m2) 224,000 177,000
berat 1,5 kg warna merah/kuning/hitam/klasik m2(107/m2) 252,000 199,000
berat 1,5 kg warna Hijau m2(107/m2) 285,000 225,000
berat 1,6 kg warna abu-abu m2(88/m2) 224,000 177,000
berat 1,6 kg warna merah/kuning/hitam/klasik m2(88/m2) 252,000 199,000
berat 1,6 kg warna Hijau m2(88/m2) 285,000 225,000
berat 2,1 kg warna abu-abu m2(68/m2) 224,000 177,000
berat 2,1 kg warna merah/kuning/hitam/klasik m2(68/m2) 252,000 199,000
berat 2,1 kg warna Hijau m2(68/m2) 285,000 225,000
berat 1,0 kg warna abu-abu m2(135/m2) 224,000 177,000
berat 1,0 kg warna merah/kuning/hitam/klasik m2(135/m2) 252,000 199,000
berat 1,0 kg warna Hijau m2(135/m2) 285,000 225,000
berat 1,5 kg warna abu-abu m2(117/m2) 256,000 202,000
berat 1,5 kg warna merah/kuning/hitam/klasik m2(117/m2) 287,000 227,000
berat 1,5 kg warna Hijau m2(117/m2) 316,000 250,000
berat 3,3 kg warna abu-abu m2(51/m2) 256,000 202,000
berat 3,3 kg warna merah/kuning/hitam/klasik m2(51/m2) 287,000 227,000
berat 3,3 kg warna Hijau m2(51/m2) 316,000 250,000
berat 2 kg warna abu-abu m2(88/m2) 256,000 202,000
berat 2 kg warna merah/kuning/hitam/klasik m2(88/m2) 287,000 227,000
berat 2 kg warna Hijau m2(88/m2) 316,000 250,000
berat 2,3 kg warna abu-abu m2(75/m2) 256,000 202,000
berat 2,3 kg warna merah/kuning/hitam/klasik m2(75/m2) 287,000 227,000
berat 2,3 kg warna Hijau m2(75/m2) 316,000 250,000
berat 4 kg warna abu-abu m2(43/m2) 256,000 202,000
berat 4 kg warna merah/kuning/hitam/klasik m2(43/m2) 287,000 227,000
berat 4 kg warna Hijau m2(43/m2) 316,000 250,000
-
-
Warna Shadow/Light, Berat 9 kg m2 430,000 340,000
Warna Shadow/Light, Berat 18 kg m2 430,000 340,000
Warna Shadow/Light, Berat 28 kg m2 430,000 340,000
Warna Abu, Berat 9 kg m2 285,000 225,000
Warna Abu, Berat 18 kg m2 285,000 225,000
Warna Abu, Berat 28 kg m2 285,000 225,000
Warna Merah/Kuning/Hitam/Klasik, Berat 9 m2 329,000 260,000
Warna Merah/Kuning/Hitam/Klasik, Berat 18 m2 329,000 260,000
Warna Merah/Kuning/Hitam/Klasik, Berat 28 m2 329,000 260,000
Warna Hijau, Berat 9 kg m2 361,000 285,000
Warna Hijau, Berat 18 kg m2 361,000 285,000
Warna Hijau, Berat 28 kg m2 361,000 285,000
Warna Merah/Kuning/Hitam/Klasik, Berat 10, bh 38,000 30,000
Warna Merah/Kuning/Hitam/Klasik, Berat 10, bh 38,000 30,000
-
Warna Abu/Merah/Kuning/Hitam/Klasik, Bera m2 395,000 312,000
Warna Hijau, Berat 5,6 kg m2 433,000 342,000
Warna Abu/Merah/Kuning/Hitam/Klasik, Bera m2 433,000 342,000
Warna Hijau, Berat 7,5 kg m2 481,000 380,000
Warna Abu/Merah/Kuning/Hitam/Klasik, Bera m2 395,000 312,000
Warna Hijau, Berat 1,5 kg m2 433,000 342,000
Warna Abu/Merah/Kuning/Hitam/Klasik, Bera m2 433,000 342,000
Warna Hijau, Berat 2 kg m2 481,000 380,500
Warna Abu/Merah/Kuning/Hitam/Klasik, Bera m2 395,000 312,000
Warna Hijau, Berat 3 kg m2 433,000 342,000
Warna Abu/Merah/Kuning/Hitam/Klasik, Bera m2 433,000 342,000
Warna Hijau, Berat 4 kg m2 481,000 380,500
Warna Abu/Merah/Kuning/Hitam/Klasik, Bera m2 395,000 312,000
Warna Hijau, Berat 5,8 kg m2 433,000 342,000
Warna Abu/Merah/Kuning/Hitam/Klasik, Bera m2 433,000 342,000
Warna Hijau, Berat 7,7 kg m2 481,000 380,500
Warna Abu/Merah/Kuning/Hitam/Klasik, Bera m2 433,000 342,000
Warna Hijau, Berat 17,5 kg m2 481,000 380,500
-
Isi 12,5 bh/m2,Warna Abu, Berat 11 kg m2 210,000 166,000
Isi 12,5 bh/m2,Warna Abu, Berat 11,5 kg m2 263,000 208,000
Isi 6,25 bh/m2,Warna Abu, Berat 23 kg m2 278,000 220,000
Isi 6,25 bh/m2,Warna Merah/Kuning/Hitam/Kl m2 314,000 248,500
Isi 6,25 bh/m2,Warna Hijau, Berat 23 kg m2 343,000 271,500
Isi 21 bh/m2,Warna Abu, Berat 8,5 kg m2 291,000 230,000
Isi 21 bh/m2,Warna Merah/Kuning/Hitam/Klas m2 323,000 255,000
Isi 21 bh/m2,Warna Hijau, Berat 23 kg m2 352,000 278,000
-
Berat 16 kg m2(2,57/m2) 32,000 25,000
Berat 17 kg m2(5/m2) 41,000 32,500
Berat 34 kg m2(2,5/m2) 70,000 55,500
Berat 18,5 kg m2(5/m2) 44,000 34,500
Berat 37 kg m2(2,5m2) 7,000 5,800
Berat 55,5 kg m2(1,67/m2) 121,000 96,000
Berat 74 kg m2(1,25/m2) 162,000 128,000
Berat 15,5 kg m2(5/m2) 37,000 29,000
Berat 31 kg m2(2,5/m2) 63,000 50,000
Berat 62 kg m2(1,25/m2) 139,000 110,000
Berat 7kg m2(10/m2) 25,000 20,000
Berat 22 kg m2(2/m2) 76,000 60,000
Berat 36 kg m2(-m2) 73,000 57,500
Berat 18 kg m2(2,5/m2) 67,000 53,000
Berat 20 kg m2(2,5/m2) 46,000 36,000
Berat 20 kg m2(2,5m2) 32,000 25,000
Berat 12,5 kg 41,000 32,500
Berat 52 kg 759,000 600,000
MA. 55 TUTUP 12,6 per set 394,000 311,500
MA. 26 TUTUP 12,6 per set 182,000 143,500
Berat 23 kg m2(2,5m2) 82,000 65,000
Berat 26 kg m2(2,5m2) 85,000 67,000
-
Berat 37 kg HOLLOW CORE NO FEEL NEEDED 0,077/m2 -
Berat 37 kg HOLLOW CORE NO FEEL NEEDED 0,077/m2 -
Berat 36 kg FOR RADIUS CURVES 0,077/m2 -
Berat 36 kg FOR RADIUS CURVES 0,077/m2 -
Berat 23 kg FOR HEIGHT VARIANCE AND FOUND 0,039/m2 -
Berat 23 kg FOR HEIGHT VARIANCE AND FOUND 0,039/m2 -
Berat 20 kg -
-
-
-
-
-
-
-
-
-
PRICE LIST + 15% pajak
- 0 1 1

174,225 191,648 192,000


202,975 223,273 223,000
221,950 244,145 244,000
180,550 198,605 199,000
205,850 226,435 226,000
227,700 250,470 250,000
202,400 222,640 223,000
231,725 254,898 255,000
257,025 282,728 283,000
261,050 287,155 287,000
293,250 322,575 323,000
333,500 366,850 367,000
179,400 197,340 197,000
203,550 223,905 224,000
227,700 250,470 250,000
208,725 229,598 230,000
238,050 261,855 262,000
261,625 287,788 288,000
213,900 235,290 235,000
241,500 265,650 266,000
266,800 293,480 293,000
175,375 192,913 193,000
205,850 226,435 226,000
227,700 250,470 250,000
204,125 224,538 225,000
235,750 259,325 259,000
261,625 287,788 288,000
213,900 235,290 235,000
241,500 265,650 266,000
266,800 293,480 293,000
177,100 194,810 195,000
201,250 221,375 221,000
218,500 240,350 240,000
211,025 232,128 232,000
235,175 258,693 259,000
253,000 278,300 278,000
183,425 201,768 202,000
211,600 232,760 233,000
232,875 256,163 256,000
213,900 235,290 235,000
242,650 266,915 267,000
266,800 293,480 293,000
185,150 203,665 204,000
214,475 235,923 236,000
228,275 251,103 251,000
213,900 235,290 235,000
251,275 276,403 276,000
261,050 287,155 287,000
178,250 196,075 196,000
204,700 225,170 225,000
232,875 256,163 256,000
179,400 197,340 197,000
203,550 223,905 224,000
227,700 250,470 250,000
212,750 234,025 234,000
238,050 261,855 262,000
261,625 287,788 288,000
213,900 235,290 235,000
242,650 266,915 267,000
266,800 293,480 293,000
179,975 197,973 198,000
207,000 227,700 228,000
227,700 250,470 250,000
208,725 229,598 230,000
236,900 260,590 261,000
261,625 287,788 288,000
203,550 223,905 224,000
228,850 251,735 252,000
258,750 284,625 285,000
203,550 223,905 224,000
228,850 251,735 252,000
258,750 284,625 285,000
203,550 223,905 224,000
228,850 251,735 252,000
258,750 284,625 285,000
203,550 223,905 224,000
228,850 251,735 252,000
258,750 284,625 285,000
203,550 223,905 224,000
228,850 251,735 252,000
258,750 284,625 285,000
232,300 255,530 256,000
261,050 287,155 287,000
287,500 316,250 316,000
232,300 255,530 256,000
261,050 287,155 287,000
287,500 316,250 316,000
232,300 255,530 256,000
261,050 287,155 287,000
287,500 316,250 316,000
232,300 255,530 256,000
261,050 287,155 287,000
287,500 316,250 316,000
232,300 255,530 256,000
261,050 287,155 287,000
287,500 316,250 316,000
-
-
13 391,000 430,100 430,000
6 391,000 430,100 430,000
4 391,000 430,100 430,000
258,750 284,625 285,000
258,750 284,625 285,000
258,750 284,625 285,000
299,000 328,900 329,000
299,000 328,900 329,000
299,000 328,900 329,000
327,750 360,525 361,000
327,750 360,525 361,000
327,750 360,525 361,000
11 34,500 37,950 38,000
34,500 37,950 38,000
-
24 358,800 394,680 395,000
393,300 432,630 433,000
393,300 432,630 433,000
437,000 480,700 481,000
91 358,800 394,680 395,000
393,300 432,630 433,000
393,300 432,630 433,000
437,575 481,333 481,000
45 358,800 394,680 395,000
393,300 432,630 433,000
393,300 432,630 433,000
437,575 481,333 481,000
23 358,800 394,680 395,000
393,300 432,630 433,000
393,300 432,630 433,000
437,575 481,333 481,000
10 393,300 432,630 433,000
437,575 481,333 481,000
-
190,900 209,990 210,000
239,200 263,120 263,000
253,000 278,300 278,000
285,775 314,353 314,000
312,225 343,448 343,000
264,500 290,950 291,000
293,250 322,575 323,000
319,700 351,670 352,000
-
28,750 31,625 32,000
37,375 41,113 41,000
63,825 70,208 70,000
39,675 43,643 44,000
6,670 7,337 7,000
110,400 121,440 121,000
147,200 161,920 162,000
33,350 36,685 37,000
57,500 63,250 63,000
126,500 139,150 139,000
23,000 25,300 25,000
69,000 75,900 76,000
66,125 72,738 73,000
60,950 67,045 67,000
41,400 45,540 46,000
28,750 31,625 32,000
37,375 41,113 41,000
690,000 759,000 759,000
358,225 394,048 394,000
165,025 181,528 182,000
74,750 82,225 82,000
77,050 84,755 85,000
-
- - -
- - -
- - -
-
- - -
-
- - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
DAFTAR SURVEY HARGA BAHAN BANGUNAN
SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk


BAHAN PENUTUP ATAP
Genteng beton flat
Wuwung genteng beton
Genteng karangpilang lokal
Wuwung karangpilang lokal
Genteng karangpilang ambulu
Wuwung genteng karangpilang ambulu
Genteng karangpilang bambe
Wuwung genteng karangpilang bambe
Genteng mantili
Wuwung genteng mantili
Genteng flam pres, jawa lokal
Seng gelombang 0,20 (1,80)
Seng gelombang 0,30
Seng talang lebar 50 ; 0,20
Seng talang lebar 60 ; 0,30
Asbes gelombang kecil p = 1,50 m ; l = 80 cm
Wuwung asbes gelombang kecil p = 80 cm
Asbes gelombang besar 80 x 225
Wuwung asbes gelombang besar
Genteng zincalume/metal roof 0,30 mm 80x72
Genteng galvalume 0,30 mm
Genteng metal roof Isodex, rainbow
Wuwung atas genteng metal roof polos
Wuwung samping genteng metal roof
Genteng keramik glazur kanmuri
Wuwung genteng keramik glazur
Sollartuff 80x180
Atap kayu kelas 1 (60 cm x 80 cm) tebal 5 mm
Genteng UPVC l = 88 cm ; p = 3 m
Genteng kaca flat
Genteng kaca gelombang 25/m2
Genteng palentong
Genteng bubung palentong
Seng BJLs 0.20 mm ; 180 cm x 80 cm
Asbes datar tebal 4 mm (1,20 x 2,40) kalsiboard
Asbes datar tebal 5 mm (60 x 200)
Asbes datar tebal 6 mm (120x 240)
Asbes datar tebal 8 mm (120x 240)
Genteng clasik 2x4 - 0,25 TCT
Genteng pasir 2x4 - 0,25 TCT
Nok win 0,25 TCT
Nok win 0,25 TCT pasir
Spandex 0,30 Lebar 80 cm
Spandex 0,35 Lebar 80 cm
Spandex 0,40
Spandex 0,50
Spandex 0,30 Lebar 75 cm
Spandex 0,35 Lebar 75 cm
Roster tanah liat / karangpilang
Roster keramik 20x20 20x20
Roster keramik 30x30 30x30

ROSTER BETON
Roster kotak 20x20
Roster salipan 20x40
Roster jalusi kecil 15x25
Roster wajik 15x30
Roster wajik 15x40
Roster kotak profil 12x24
Roster kotak profil 15x30
Roster kotak profil 15x40
Roster kotak profil 15x45
Roster jalusi besar 38x38
Roster Madina 25x25
Roster kotak 4 polos 20x40

POLYCARBONATE
1 Twinlite Gen 2 (11.8x2.1) tebal 5 mm
Twinlite Gen 2 (11.8x2.1) tebal 6 mm
Twinlite Gen 2 (11.8x2.1) tebal 10 mm
Twinlite Gen 2 (11.8x2.1) tebal 16 mm
2 Solarlite (11.8x2.1) tebal 4 mm all colour
Solarlite (11.8x2.1) tebal 4 mm dark grey
3 Solite (11.8x2.1) tebal 4 mm all colour
Solite (11.8x2.1) tebal 4 mm dark grey
4 Solartuff solid (50 m x 1.1 m) tebal 1.2 mm all colour
Solartuff solid (20 m x 1,22 m) tebal 3 mm all colour
Solartuff solid (6 m x 1.22 m) tebal 6 mm all colour
5 Solartuff (p=1.80,2.40,3.00,3.60,4.20,6.00 ; l = 0.84 / 0.86 ) tebal 0.80
Solartuff (p=6 ; l 0,84 ) tebal 0.8
6 Twinlite Greca ( p=4,5,6 ; l =0,875 ) tebal 6 mm

AKSESORIS
Profile H Polycarnonate size 6/4
Profile U Polycarbonate size 6/4
Profile ( atas/bawah) aluminium size 5 cm
Profile ( atas/bawah) aluminium size 7.5 cm
Profile tutup aluminium size 2.5 cm
Karet Santopren size 50 m
Bolt & Seal ( wood) size 50 pcs
Bolt & Seal (besi) size 50 pcs
Antidust breather tape 33 m
Antidust blangking tape 50 m

ONDULINE
Onduline 2000x950 ( merah,hijau,coklat,hitam2000x950 ( merah,hijau,coklat,hitam)
Onduline Premium 2007x1016 mm ( biru ) 2007x1016 mm ( biru )
Genteng Onduvilla 1060x400 (merah 3D, coklat1060x400 (merah 3D, coklat 3D, hijau 3D, hijau, hi
1060x400 (terracota 3D, fiorentino 3D)
Onduclair 2000x950 (transparan) 2000x950 (transparan)
Onduline tile 1950x960 (red) 1950x960 (red)
Roof vent 45x51 cm
Corrugated ventilated filter 61 cm
Ventilation pipe 45x51 cm
Apron piece 102x14 cm 102x14 cm
Clousure cap 106x19,4 cm
Verge piece 104 x 10,5 x h 11,4 cm 104 x 10,5 x h 11,4 cm
Verge standard 90x40 cm 90x40 cm
Slim cap 106x19,4 cm 106x19,4 cm
Adapter Onduvila/Onduline noir 66,5x27,5 cm
Skylight 82,5x66,9 cm
Ondulair slim 15 cm x 5 m 15 cm x 5 m
Onduband 10x10 m
Onduband 15x10 m
Onduband 20x10 m 20x10 m
Ridge premium 91x44 cm
Speedy screw 65 mm (merah,coklat,hitam,hijau
65 mm (merah,coklat,hitam,hijau,terracota,fiorentin
Safe top nail 70 mm 70 mm
Ridge standard 1000x500 ( merah,coklat,hitam,hijau )
1000x500 ( terracotta,fiorentino )
93x19 cm
1 pack = 3,05 m
Ondubar 1 roll = 30 m
310 mm
Onduvilla clear tile Transparan Transparan

ATAP GELOMBANG BESAR


1 Atap gelombang besar (305x100) tebal 5 Eter
Atap gelombang besar (250x100) tebal 5 Eter
Atap gelombang besar (225x100) tebal 5 Eter
Atap gelombang besar (200x100) tebal 5 Eter
Atap gelombang besar (180x100) tebal 5 Eter
Atap gelombang besar (150x100) tebal 5 Eter
Atap gelombang besar (365x100) tebal 6 Eter
Atap gelombang besar (305x100) tebal 6 Eter
Atap gelombang besar (250x100) tebal 6 Eter
Atap gelombang besar (225x100) tebal 6 Eter
Atap gelombang besar (200x100) tebal 6 Eter
Atap gelombang besar (180x100) tebal 6 Eter
Atap gelombang besar (150x100) tebal 6 Eter

AKSESORIS atap gelombang besar


Nok stel gelombang
Nok stel rata
Lisplank simetris
Lisplank siku
Ujung nok stel

ATAP GELOMBANG KECIL


2 Atap gelombang kecil (240x80) tebal 3.5 Eter
Atap gelombang kecil (210x80) tebal 3.5 Eter
Atap gelombang kecil (180x80) tebal 3.5 Eter

AKSESORIS atap gelombang kecil 3.5


Nok stel gelombang
Lisplank siku
Ujung nok stel

Atap gelombang kecil (300x105) tebal 4 Eter


Atap gelombang kecil (270x105) tebal 4 Eter
Atap gelombang kecil (240x105) tebal 4 Eter
Atap gelombang kecil (210x105) tebal 4 Eter
Atap gelombang kecil (180x105) tebal 4 Eter

AKSESORIS atap gelombang kecil 4


Nok stel gelombang
Nok stel rata
Lisplank siku
Ujung nok stel
VEY HARGA BAHAN BANGUNAN

Harga
Satuan
2018

bh 5,200
bh 12,400
bh 1,800
bh 7,600
bh 3,700
bh 11,500
bh
bh
bh 1,900
bh 7,600
bh 1,400
lembar 68,425
lembar
m' 30,400
m'
lembar 78,850
set 21,500
lembar 107,600
lembar 23,300
lembar 50,000
lembar 40,200
m2 92,000
bh 40,200
bh 40,200
bh 11,700
bh 29,900
lembar 300,000
bh -
m2 175,000
bh 51,700
bh 51,700
bh 2,500
bh 12,700
Lembar 54,000
Lembar 45,700
Lembar 58,800
Lembar 66,500
Lembar
Bh 37,900
Bh 58,600
Bh 26,400
Bh 46,000
m' 43,700
m' 61,800
m' 80,500
m' 103,500
m' 44,800
m' 60,900
bh 13,800
bh 34,500
bh -
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
m'
m'
m'
m'
m'
m'

btg
btg
btg
btg
btg
btg
roll
pack
pack
roll

Lembar 211,300
Lembar 243,300
Lembar 67,600
Lembar 70,000
Lembar 322,400
Lembar 190,700
Lembar 676,200
Lembar 1,146,500
Lembar 885,200
Lembar 65,500
Lembar 77,800
Lembar 65,500
Lembar 67,800
Lembar 76,000
Lembar 181,300
Lembar 740,900
roll 300,000
roll 289,800
roll 362,200
roll 434,700
bh 76,600
biji 1,400
biji 1,000
Lembar 100,200
Lembar 99,000
Lembar 253,500
/m2 191,300
/m2 31,300
/btl 67,000
biji -

lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr
lmbr

lmbr
lmbr
lmbr

lmbr
lmbr
lmbr
lmbr
lmbr
DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

Harga Harga
No Jenis Pekerjaan Merk Satuan
2018 usulan 2019
BOX CULVERT
1 Box culvert 60.60.120.10 10 Ton Bh 1,221,000 1,845,175
Box culvert 60.60.120.10 20 Ton Bh 2,241,350
Box culvert 60.60.100.10 Bh 1,368,500
Box culvert 60.60.100.12 Bh 1,874,500
Box culvert 60.60.100.14 Bh 3,277,500
2 Box culvert 80.80.120.12 10 Ton Bh 2,894,550 2,765,750
Box culvert 80.80.120.12 20 Ton Bh 3,340,175
3 Box culvert 100.100.120.14 10 Ton Bh 4,031,900 3,795,000
Box culvert 100.100.120.14 20 Ton Bh 4,570,100
Box culvert 100.100.120.15 10 Ton Bh 4,128,500
Box culvert 100.100.120.15 20 Ton Bh 4,715,000
HPS
CIPTA KARYA BINA MARGA
RABANTON KARYA INOVA BETON INDONESI
1,489,000
1,928,000
1,190,000
1,630,000
2,850,000
2,320,000
2,969,000
3,300,000
3,974,000
RESPONDEN
1 2
BETON MAJU MAPAN RATA-RATA 15%
1,720,000 1,604,500 1,845,175 -
1,970,000 1,949,000 2,241,350
1,190,000 1,368,500
1,630,000 1,874,500
2,850,000 3,277,500
2,490,000 2,405,000 2,765,750 -
2,840,000 2,904,500 3,340,175
3,300,000 3,795,000 -
3,974,000 4,570,100
3,590,000 3,590,000 4,128,500
4,100,000 4,100,000 4,715,000
keuntunga
INFO rata-rata n pembulatan
15%

SPONDEN
3

- - -

- - -

- - -

#DIV/0! #DIV/0! #DIV/0!


DAFTAR SURVEY HARGA BAHAN BANGUNAN

SUMBER DATA :
KABUPATEN : BANYUWANGI

No Jenis Pekerjaan Merk Satuan


PAVING
1 Paving 21.0 x 10.5 x 6.0 mutu K 200 m2
Paving 21.0 x 10.5 x 6.0 mutu K 225 m2
Paving 21.0 x 10.5 x 6.0 mutu K 250 m2
Paving 21.0 x 10.5 x 6.0 mutu K 275 m2
Paving 21.0 x 10.5 x 6.0 mutu K 300 m2
Paving 21.0 x 10.5 x 6.0 mutu K 350 m2
Paving 10.5x10.5x6 mutu K300 m2
Paving 10.5x10.5x6 mutu K300 bh
Paving 12.5x12.5x6 mutu K400 m2
Paving 12.5x12.5x6 mutu K400 bh
2 Paving 21.0 x 10.5 x 6.0 mutu K 175 warna m2
Paving 21.0 x 10.5 x 6.0 mutu K 200 warna m2
Paving 21.0 x 10.5 x 6.0 mutu K 300 warna m2
Paving 21.0 x 10.5 x 6.0 mutu K 350 warna m2
Paving 10.5x10.5x6 mutu K300 warna m2
Paving 10.5x10.5x6 mutu K300 warna bh
Paving 12.5x12.5x6 mutu K400 warna m2
Paving 12.5x12.5x6 mutu K400 warna bh
3 Uskup Tbl 6.0 mutu K 200 bh
Uskup Tbl 6.0 mutu K 225 bh
Uskup Tbl 6.0 mutu K 250 bh
Uskup Tbl 6.0 mutu K 275 bh
Uskup Tbl 6.0 mutu K 300 bh
Uskup Tbl 6.0 mutu K 350 bh
4 Kanstin 40 x 30 x 10 K 250 bh
Kanstin 40 x 30 x 10 K 275 bh
Kanstin 40 x 30 x 10 K 300 bh
Kanstin 40 x 20 x 10 K 250 bh
Kanstin 40 x 20 x 10 K 275 bh
Kanstin 40 x 20 x 10 K 300 bh
PERTAMANAN
Kanstin Halus 60x27x10/15 K 225 P=60cm x T=2 bh
Kanstin 40x28x12/16 K 225 P= 40cm x T= bh
Kanstin Taman 40x20x8/10 K225 P=40cm x T= bh
Kanstin S 40x30x9/17 K 225 P= 40cm x T= bh
Kanstin Duduk 38,5x20x10/20 K 225 P= 38,5cm x bh
DIFABEL
Difabel Uk. 30cmx30cm Uk. 30cmx30 bh
5 Paving Trapesium polos kecil 12.5/7x12.5x6 K 400 m2
Paving Trapesium polos kecil 12.5/7x12.5x6 K 400 bh
Paving Trapesium polos besar 12.5/10x12.5x6 K 400 m2
Paving Trapesium polos besar 12.5/10x12.5x6 K 400 bh
Paving Trapesium warna kecil 12.5/7x12.5x6 K 400 m2
Paving Trapesium warna kecil 12.5/7x12.5x6 K 400 bh
Paving Trapesium warna besar 12.5/7x12.5x6 K 400 m2
Paving Trapesium warna besar 12.5/7x12.5x6 K 400 bh
6 Paving Stone segi enam tebal 5 cm m²
Paving stone segi enam 6 cm halus m²
Paving stone segi enam tebal 8 cm halus m²
AN

Harga
2018

54,500
56,700
59,200
63,000
66,100

76,900
80,500
97,600

4,400
4,500
4,800
4,900
5,100
5,100
23,700
25,200
26,700
20,300
21,500
22,900
45,200
48,900
63,900
Harga
No Jenis Pekerjaan Merk Satuan
2018
U-DITCH / U GUTTER
1 U-DITCH 30.40.60 tebal 8 bh 217,300
2 U-DITCH 40.50.60 tebal 8 bh 300,600
3 U-DITCH 50.60.60 tebal 8 bh 427,400
4 U-DITCH 30.40.120 tebal 8 bh 403,300
5 U-DITCH 40.50.120 tebal 8 bh 546,900
6 U-DITCH 50.60.120 tebal 8 bh 778,800
7 U-DITCH 60.70.120 tebal 9 bh 1,185,700
8 U-DITCH 80.80.120 tebal 12.5 bh 1,421,800
9 U-DITCH 100.100.120 tebal 15 bh 2,132,400

COVER U-DITCH / U GUTTER


1 CU 46.60 tebal 8 bh 66,400
2 CU 56.60 tebal 10 bh 93,500
3 CU 66.60 tebal 12 bh 141,200
4 CU 78.60 tebal 12 bh
5 CU 105.60 tebal 14 bh
6 CU 130.60 tebal 17.5 bh

1 Penangkap air 40.30.80 tebal 8 + Screen besi ulir 16 bh