I Penyiapan R3K3
Pembuatan Manual, Prosedur, Instruksi
1 Kerja, Ijin Kerja Dan Formulir; Set 2.0000
VI Personil K3
1 Petugas K3 OB 4.00
2 Petugas P3K; OB 4.00
ASUMSI
# Jumlah Pekerja : 15.00 Orang
TUAN
200,000.00 400,000.00
5,000.00 75,000.00
10,000.00 150,000.00
10,000.00 150,000.00
500,000.00 1,000,000.00
25,000.00 375,000.00
350,000.00 700,000.00
150,000.00 300,000.00
750,000.00 1,500,000.00
2,000,000.00 2,000,000.00
1,500,000.00 1,500,000.00
50,000.00 1,000,000.00
75,000.00 525,000.00
2,000.00 30,000.00
5,000.00 70,000.00
150,000.00 2,250,000.00
50,000.00 750,000.00
1,800,000.00 1,800,000.00
Estimasi 1% dr HPS
1,000,000.00 1,000,000.00 sesuai jlh alat berat utk mobilisasi
1,500,000.00 1,500,000.00
1,750,000.00 7,000,000.00
1,250,000.00 5,000,000.00
1,000,000.00 1,000,000.00
100,000.00 200,000.00
100,000.00 200,000.00
100,000.00 200,000.00
100,000.00 200,000.00
100,000.00 200,000.00
300,000.00 600,000.00
100,000.00 100,000.00
50,000.00 100,000.00
70,000.00 140,000.00
500,000.00 500,000.00
500,000.00 500,000.00
33,015,000.00
4,952,250.00
37,967,250.00
37,960,000.00 37,967,200
(7,200.00)
PEKERJAAN Galian
CELL A
0
6 53.29 26.645 159.87
5 41.39 47.34 236.70
3 29.67 35.53 106.59
3 4.657 17.1635 51.49
3 2.3285 6.99
Jumlah 561.64
PEKERJAAN TIMBUNAN
0 5.4763
3 19.64 12.55815 37.67
3 29.85 24.745 74.24
4 35.63 32.74 130.96
5 32.23 33.93 169.65
5 48.83 40.53 202.65
5 66.054 57.442 287.209
Jumlah 902.38
Daftar Harga Bahan
Harga Satuan
No Uraian Satuan Keterangan
(Rp.)
Harga Satuan
No Uraian Satuan Keterangan
(Rp.)
Jam/hr /jam OH
1 Pekerja OH 80,000.00 Pekerja 8.00 10,000.00 80,000.00
2 Tukang OH 94,400.00 Tukang 8.00 11,800.00 94,400.00
3 Kepala Tukang OH 108,000.00 Kepala Tukang 8.00 13,500.00 108,000.00
4 Mandor OH 112,000.00 Mandor 8.00 14,000.00 112,000.00
5 Operator OH 116,000.00 Operator 8.00 14,500.00 116,000.00
6 Juru Ukur OH 92,000.00 Juru Ukur 8.00 11,500.00 92,000.00
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 20,840.00
1 Pekerja O/H 0.100 80,000.00 8,000.00
2 Mandor O/H 0.100 112,000.00 11,200.00
3 Kepala Tukang O/H 0.010 108,000.00 1,080.00
4 Mandor O/H 0.005 112,000.00 560.00
B BAHAN 68,400.00
1 Kayu Balok 5/7 M3 0.0120 4,200,000.00 50,400.00
2 Paku 2"-3" Kg 0.0200 25,000.00 500.00
3 Kayu papan 3/20 M3 0.0070 2,500,000.00 17,500.00
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 45,600.00
1 Pekerja O/H 0.500 80,000.00 40,000.00
2 Mandor O/H 0.050 112,000.00 5,600.00
B BAHAN 77,000.00
1 Tanah Timbunan Biasa M3 1.100 70,000.00 77,000.00
C ALAT 69,431.75
1 Vibratory Roller Sewa/Jam 0.150 449,049.83 67,357.47
2 Stamper Sewa/Jam 0.050 41,485.56 2,074.28
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 45,600.00
1 Pekerja O/H 0.500 80,000.00 40,000.00
2 Mandor O/H 0.050 112,000.00 5,600.00
B BAHAN 143,000.00
1 Pasir Urug M3 1.100 130,000.00 143,000.00
C ALAT 69,431.75
1 Vibratory Roller Sewa/Jam 0.150 449,049.83 67,357.47
2 Stamper Sewa/Jam 0.050 41,485.56 2,074.28
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 62,800.00
1 Pekerja O/H 0.750 80,000.00 60,000.00
2 Mandor O/H 0.025 112,000.00 2,800.00
B BAHAN -
C ALAT -
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 143,528.00
1 Pekerja O/H 1.320 80,000.00 105,600.00
2 Tukang O/H 0.220 94,400.00 20,768.00
3 Kepala Tukang O/H 0.022 108,000.00 2,376.00
4 Mandor O/H 0.132 112,000.00 14,784.00
B BAHAN 905,960.00
1 Semen PC 50 Kg Kg 227.000 1,480.00 335,960.00
2 Pasir Beton M3 0.618 200,000.00 123,600.00
3 Kerikil M3 0.744 600,000.00 446,400.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 49,100.00
1 Pekerja O/H 0.250 80,000.00 20,000.00
2 Tukang O/H 0.250 94,400.00 23,600.00
3 Kepala Tukang O/H 0.025 108,000.00 2,700.00
4 Mandor O/H 0.025 112,000.00 2,800.00
B BAHAN 938,000.00
1 Besi Wiremesh M10 Lembar 1.000 888,000.00 888,000.00
2 Kawat Beton Kg 0.500 100,000.00 50,000.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 13,412.00
1 Pekerja O/H 0.070 80,000.00 5,600.00
2 Tukang O/H 0.070 94,400.00 6,608.00
3 Kepala Tukang O/H 0.007 108,000.00 756.00
4 Mandor O/H 0.004 112,000.00 448.00
B BAHAN 154,950.00
1 Besi Beton Kg 10.500 14,600.00 153,300.00
2 Kawat Beton Kg 0.150 11,000.00 1,650.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 229,000.00
1 Pekerja O/H 1.200 80,000.00 96,000.00
2 Tukang O/H 1.000 94,400.00 94,400.00
3 Kepala Tukang O/H 0.150 108,000.00 16,200.00
4 Mandor O/H 0.200 112,000.00 22,400.00
B BAHAN 23,400.00
1 Tulangan utama Kg 1.000 14,600.00 14,600.00
2 Kawat Beton Kg 0.500 11,000.00 5,500.00
3 Tulangan sengkang Kg 0.300 11,000.00 3,300.00
C ALAT
Jumlah (A+B+C) 252,400.00
Biaya Umum dan Keuntungan (10%) 25,240.00
Total 277,640.00
Pembulatan 277,640.00
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 229,000.00
1 Pekerja O/H 1.200 80,000.00 96,000.00
2 Tukang O/H 1.000 94,400.00 94,400.00
3 Kepala Tukang O/H 0.150 108,000.00 16,200.00
4 Mandor O/H 0.200 112,000.00 22,400.00
B BAHAN 154,840.00
1 Tulangan Dowel m' 1.000 76,000.00 76,000.00
2 Kawat Beton kg 0.400 14,600.00 5,840.00
3 Tulangan Tie Bar m' 5.000 14,600.00 73,000.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 229,000.00
1 Pekerja O/H 1.200 80,000.00 96,000.00
2 Tukang O/H 1.000 94,400.00 94,400.00
3 Kepala Tukang O/H 0.150 108,000.00 16,200.00
4 Mandor O/H 0.200 112,000.00 22,400.00
B BAHAN 23,400.00
1 Tulangan utama Kg 1.000 14,600.00 14,600.00
2 Kawat Beton Kg 0.500 11,000.00 5,500.00
3 Tulangan sengkang Kg 0.300 11,000.00 3,300.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 45,606.00
1 Pekerja O/H 0.330 80,000.00 26,400.00
2 Tukang O/H 0.165 94,400.00 15,576.00
3 Kepala Tukang O/H 0.017 108,000.00 1,782.00
4 Mandor O/H 0.017 112,000.00 1,848.00
B BAHAN 87,520.00
1 Multiplek 12 mm Lembar 0.128 215,000.00 27,520.00
2 Kayu Bekisting M3 0.020 2,500,000.00 50,000.00
3 Paku Uk. 3 cm - 7 cm Kg 0.400 25,000.00 10,000.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 140,517.60
1 Pekerja O/H 1.323 80,000.00 105,840.00
2 Tukang O/H 0.189 94,400.00 17,841.60
3 Kepala Tukang O/H 0.019 108,000.00 2,052.00
4 Mandor O/H 0.132 112,000.00 14,784.00
B BAHAN 1,115,885.00
1 Semen Kg 326.000 1,320.00 430,320.00
2 Pasir Kg 760.000 110.00 83,600.00
3 Kerikil Kg 1,029.00 585.00 601,965.00
C ALAT 44,911.91
1 Concrete Mixer Sewa/Jam 0.250 175,968.24 43,992.06
2 Concrete Vibrator Sewa/Jam 0.025 36,793.96 919.85
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 140,517.60
1 Pekerja O/H 1.323 80,000.00 105,840.00
2 Tukang O/H 0.189 94,400.00 17,841.60
3 Kepala Tukang O/H 0.019 108,000.00 2,052.00
4 Mandor O/H 0.132 112,000.00 14,784.00
B BAHAN 1,178,995.00
1 Semen Kg 371.000 1,320.00 489,720.00
2 Pasir Kg 698.000 110.00 76,780.00
3 Kerikil Kg 1,047.00 585.00 612,495.00
C ALAT 44,911.91
1 Concrete Mixer Sewa/Jam 0.250 175,968.24 43,992.06
2 Concrete Vibrator Sewa/Jam 0.025 36,793.96 919.85
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 140,517.60
1 Pekerja O/H 1.323 80,000.00 105,840.00
2 Tukang O/H 0.189 94,400.00 17,841.60
3 Kepala Tukang O/H 0.019 108,000.00 2,052.00
4 Mandor O/H 0.132 112,000.00 14,784.00
B BAHAN 2,567,980.00
1 Semen Kg 371.000 1,320.00 489,720.00
2 Pasir Kg 698.000 110.00 76,780.00
3 Kerikil Kg 1,047.00 585.00 612,495.00
4 Besi Kg 75.00 18,519.80 1,388,985.00
C ALAT 44,911.91
1 Concrete Mixer Sewa/Jam 0.250 175,968.24 43,992.06
2 Concrete Vibrator Sewa/Jam 0.025 36,793.96 919.85
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 140,517.60
1 Pekerja O/H 1.323 80,000.00 105,840.00
2 Tukang O/H 0.189 94,400.00 17,841.60
3 Kepala Tukang O/H 0.019 108,000.00 2,052.00
4 Mandor O/H 0.132 112,000.00 14,784.00
B BAHAN 4,419,960.00
1 Semen Kg 371.000 1,320.00 489,720.00
2 Pasir Kg 698.000 110.00 76,780.00
3 Kerikil Kg 1,047.00 585.00 612,495.00
4 Besi Kg 175.00 18,519.80 3,240,965.00
C ALAT 44,911.91
1 Concrete Mixer Sewa/Jam 0.250 175,968.24 43,992.06
2 Concrete Vibrator Sewa/Jam 0.025 36,793.96 919.85
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 140,517.60
1 Pekerja O/H 1.323 80,000.00 105,840.00
2 Tukang O/H 0.189 94,400.00 17,841.60
3 Kepala Tukang O/H 0.019 108,000.00 2,052.00
4 Mandor O/H 0.132 112,000.00 14,784.00
B BAHAN 1,310,855.00
1 Semen Kg 492.000 1,320.00 649,440.00
2 Pasir Kg 700.000 110.00 77,000.00
3 Kerikil Kg 999.00 585.00 584,415.00
C ALAT 44,911.91
1 Concrete Mixer Sewa/Jam 0.250 175,968.24 43,992.06
2 Concrete Vibrator Sewa/Jam 0.025 36,793.96 919.85
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 11,448.00
1 Pekerja O/H 0.060 80,000.00 4,800.00
2 Tukang O/H 0.060 94,400.00 5,664.00
3 Kepala Tukang O/H 0.006 108,000.00 648.00
4 Mandor O/H 0.003 112,000.00 336.00
B BAHAN 21,380.00
1 Baja H Beam Kg 1.150 16,200.00 18,630.00
2 Baut Kg 0.050 55,000.00 2,750.00
C ALAT 42,500.00
1 Welding Set Sewa/Jam 0.170 250,000.00 42,500.00
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 11,448.00
1 Pekerja O/H 0.060 80,000.00 4,800.00
2 Tukang O/H 0.060 94,400.00 5,664.00
3 Kepala Tukang O/H 0.006 108,000.00 648.00
4 Mandor O/H 0.003 112,000.00 336.00
B BAHAN 20,575.00
1 Baja IWF Kg 1.150 15,500.00 17,825.00
2 Baut Kg 0.050 55,000.00 2,750.00
C ALAT 21,058.94
1 Welding Set Sewa/Jam 0.170 123,876.11 21,058.94
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 11,448.00
1 Pekerja O/H 0.060 80,000.00 4,800.00
2 Tukang O/H 0.060 94,400.00 5,664.00
3 Kepala Tukang O/H 0.006 108,000.00 648.00
4 Mandor O/H 0.003 112,000.00 336.00
B BAHAN 20,575.00
1 Baja C Kg 1.150 15,500.00 17,825.00
2 Baut Kg 0.050 55,000.00 2,750.00
C ALAT 21,058.94
1 Welding Set Sewa/Jam 0.170 123,876.11 21,058.94
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 92,112.00
1 Pekerja O/H 0.150 80,000.00 12,000.00
2 Tukang O/H 0.750 94,400.00 70,800.00
3 Kepala Tukang O/H 0.080 108,000.00 8,640.00
4 Mandor O/H 0.006 112,000.00 672.00
B BAHAN 194,250.00
1 Zincalume Lembar 1.050 185,000.00 194,250.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 140,037.60
1 Pekerja O/H 0.734 80,000.000 58,720.00
2 Tukang O/H 0.734 94,400.000 69,289.60
3 Kepala Tukang O/H 0.073 108,000.000 7,884.00
4 Mandor O/H 0.037 112,000.000 4,144.00
B BAHAN 238,330.00
1 C-75, 0.8 M 1.49 37,500.000 55,800.00
2 C-75, 0.6 M 2.23 33,750.000 75,330.00
3 Baut Bh 28.00 2,000.000 56,000.00
4 dynabold Bh 1.60 5,000.00 8,000.00
5 Reng M 5.40 8,000.00 43,200.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 36,200.00
1 Pekerja O/H 0.300 80,000.000 24,000.00
2 Tukang O/H 0.100 94,400.000 9,440.00
3 Kepala Tukang O/H 0.010 108,000.000 1,080.00
4 Mandor O/H 0.015 112,000.000 1,680.00
B BAHAN 92,610.00
1 Bata Bh 70.00 1,000.000 70,000.00
2 Semen PC 50 Kg Kg 11.50 1,480.000 17,020.00
3 Pasir Pasang M3 0.04 130,000.000 5,590.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 41,460.00
1 Pekerja O/H 0.300 80,000.000 24,000.00
2 Tukang O/H 0.150 94,400.000 14,160.00
3 Kepala Tukang O/H 0.015 108,000.000 1,620.00
4 Mandor O/H 0.015 112,000.000 1,680.00
B BAHAN 14,809.52
1 Semen PC 40 Kg Kg 7.78 1,520.000 11,819.52
2 Pasir Pasang M3 0.02 130,000.000 2,990.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 74,560.00
1 Pekerja O/H 0.300 80,000.00 24,000.00
2 Tukang O/H 0.500 94,400.00 47,200.00
3 Mandor O/H 0.030 112,000.00 3,360.00
B BAHAN 330,000.00
1 Splitzer bh 1.000 275,000.00 275,000.00
2 Tiang Splitzer bh 1.000 55,000.00 55,000.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 74,560.00
1 Pekerja O/H 0.300 80,000.00 24,000.00
2 Tukang O/H 0.500 94,400.00 47,200.00
3 Mandor O/H 0.030 112,000.00 3,360.00
B BAHAN 2,650,000.00
1 Kabel BC 50 mm m 30.000 65,000.00 1,950,000.00
2 Pipa Pvc m 5.000 120,000.00 600,000.00
3 Klem BC bh 10.000 10,000.00 100,000.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 74,560.00
1 Pekerja O/H 0.300 80,000.00 24,000.00
2 Tukang O/H 0.500 94,400.00 47,200.00
3 Mandor O/H 0.030 112,000.00 3,360.00
B BAHAN 365,000.00
1 Rod Grounding bh 1.000 350,000.00 350,000.00
3 Klem cincinn bh 1.000 15,000.00 15,000.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 9,416.00
1 Pekerja O/H 0.036 80,000.00 2,880.00
2 Tukang O/H 0.060 94,400.00 5,664.00
3 Kepala Tukang O/H 0.006 108,000.00 648.00
4 Mandor O/H 0.002 112,000.00 224.00
B BAHAN 1,021,250.00
1 Lampu 50 Watt Unit 1.000 125,000.00 125,000.00
2 Lampu 150 Watt Unit 2.000 310,000.00 620,000.00
3 Tiang Lampu Jalan 150 Watt Unit 0.750 310,000.00 232,500.00
4 Perlengkapan % 0.350 125,000.00 43,750.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 14,635.20
1 Pekerja O/H 0.105 80,000.00 8,400.00
2 Tukang O/H 0.053 94,400.00 5,003.20
4 Mandor O/H 0.011 112,000.00 1,232.00
B BAHAN 120,000.00
1 Pipa PVC 4" M 1.000 120,000.00 120,000.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 8,292.00
1 Pekerja O/H 0.060 80,000.00 4,800.00
2 Tukang O/H 0.030 94,400.00 2,832.00
3 Kepala Tukang O/H 0.003 108,000.00 324.00
4 Mandor O/H 0.003 112,000.00 336.00
B BAHAN 251,292.00
1 U ditch 30x30x80 Unit 1.000 250,000.00 250,000.00
2 Semen Kg 0.680 1,900.00 1,292.00
3 Pasir pasang M3 0.013 130,000.00 1,690.00
4 Pasir urug M3 0.011 130,000.00 1,430.00
C ALAT
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 16,212.40
1 Pekerja O/H 0.085 80,000.00 6,800.00
2 Tukang O/H 0.085 94,400.00 8,024.00
3 Kepala Tukang O/H 0.009 108,000.00 918.00
4 Mandor O/H 0.004 112,000.00 470.40
B BAHAN 4,015,000.00
1 Pintu Alumunium Unit 1.000 3,100,000.00 3,100,000.00
2 Jendela Alumunium Untt 1.000 915,000.00 915,000.00
C ALAT
Jumlah (A+B+C) 4,031,212.40
Biaya Umum dan Keuntungan (10%) 403,121.24
Total 4,434,333.64
Pembulatan 4,434,333.00
No. Uraian Pekerjaan Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A UPAH 52,520.00
1 Pekerja O/H 0.150 80,000.00 12,000.00
2 Tukang O/H 0.300 94,400.00 28,320.00
3 Kepala Tukang O/H 0.030 108,000.00 3,240.00
4 Mandor O/H 0.080 112,000.00 8,960.00
B BAHAN 131,250.00
1 Talang Air m 1.050 125,000.00 131,250.00
C ALAT
Pekerja 0.823
Tukang Besi 0.055
Kepala tukang 0.014
Mandor 0.003
0.823
oh
47,100.00
Rp
38,744.46
Rp
-.
Tukang Besi
0.055
oh
55,300.00
Rp
3,032.65
Rp
-.
Kepala tukang
0.014
oh
60,800.00
Rp
833.57
Rp
-.
Mandor
0.003
oh
66,450.00
Rp
182.21
Rp
Jumlah
92,287.04
Rp
Jasa pelaksanaan maks. 10 %
9,228.70
Rp
dibulatkan
101,500.00
Rp
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
1. Pekerja (L01) jam 0.0099 10,000.00
2. Tukang (L02) jam 0.0050 11,800.00
3. Mandor (L03) jam 0.0017 14,000.00
JUMLAH HARGA TENAGA
B. BAHAN
1. Beton K-250 (EI-715) M3 0.1257 3,028,750.00
2. Baja Tulangan (EI-731) Kg 21.9911 14,600.00
mm
JUMLAH
HARGA
(Rp)
99.40
58.64
23.19
181.23
380,603.95
321,070.77
701,674.72
637.80
2,918.27
0.00
3,556.08
705,412.03
70,541.20
775,953.23
Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Beton berdasarkan analisa item pekerjaan ybs
3 Baja tulangan berdasarkan analisa item ybs
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Panjang Tiang p 12.00
7 Ukuran diameter tiang bor beton Uk 0.40
8 Kebutuhan Baja tulangan Mb 175
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1 Qt 603.64
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang T 3.00
- Pekerja P 6.00
SATUAN KETERANGAN
KM
jam
M
M
Kg/M3
M3
M2
menit
menit
menit
menit
menit
M3
-
menit
menit
menit
M3/jam
M'/jam
Jam
Lumpsum
SATUAN KETERANGAN
M'/jam
orang
orang
orang
jam
jam
jam
HARGA PERKIRAAN SENDIRI (HPS
UNIT KERJA :
PEKERJAAN :
LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :
A Pekerjaan Persiapan
1 Mobilisasi dan Demobilisasi Ls
2 Pengukuran M²
3 Pemasangan Bowplank M²
B Pekerjaan Tanah
3 Pembersihan Lapangan dan Striping Permukaan Tanah M2
4 Timbunan Tanah Didatangkan dan Dipadatkan M³
F Pekerjaan Finishing
1 Pembersihan Lokasi Ls
2 Pengecatan Total Ls
F Pekerjaan SMK3
1 Pekerjaan SMK3 Ls
TOTAL (A+B)
PPN (10%)
JUMLAH TOTAL
PEMBULATAN
TERBILANG : Tiga Milyar Delapan Ratus Tiga Puluh Empat Juta Enam Ratus Delapan Puluh rib
ERKIRAAN SENDIRI (HPS)
BWS SUMATERA VI
KOTA JAMBI
APBN
2019
###
Harga Satuan Jumlah Harga
Vol
(Rp.) (Rp.)
23,857,314.80
1.00 10,500,000.00 10,500,000.00
887.60 1,700.00 1,508,920.00
120.70 98,164.00 11,848,394.80
194,932,905.90
887.60 4,867.00 4,319,949.20
902.38 211,234.00 190,612,956.70
2,206,488,467.52
561.64 69,080.00 38,797,814.88
235.27 283,834.00 66,776,915.60
170.00 775,953.23 131,912,049.60
199.63 1,154,436.00 230,454,286.50 ###
72.00 1,645,912.96 118,505,733.11
67.20 1,500,866.00 100,858,195.20
197.04 3,028,750.00 596,786,338.66
3.70 5,065,928.00 18,743,933.60
10.80 5,065,928.00 54,712,022.40
100.00 1,085,810.00 108,581,000.00
7.00 1,085,810.00 7,600,670.00
224.00 146,438.00 32,802,112.00
108.03 146,438.00 15,820,185.27
130.00 1,085,810.00 141,155,300.00
911.20 146,438.00 133,434,305.60
272.87 1,500,866.00 409,547,605.11
1,007,834,050.32
170.88 141,691.00 24,212,158.08
112.08 141,691.00 15,880,727.28
24.00 141,691.00 3,400,584.00
341.76 61,896.00 21,153,576.96
224.16 61,896.00 13,874,607.36
48.00 61,896.00 2,971,008.00
1,096.08 18,519.80 20,299,136.08
30.80 146,438.00 4,510,290.40
3.24 3,028,750.00 9,821,630.50
5,989.92 82,860.00 496,324,771.20
1,279.98 58,390.00 74,738,032.20
550.00 58,390.00 32,114,500.00
902.40 58,390.00 52,691,136.00
790.13 58,390.00 46,135,924.26
456.00 80,000.00 36,480,000.00
2.00 3,100,000.00 6,200,000.00
4.00 915,000.00 3,660,000.00
72.00 416,204.00 29,966,688.00
360.00 314,998.00 113,399,280.00
15,000,000.00
1.00 5,000,000.00 5,000,000.00
1.00 10,000,000.00 10,000,000.00
37,960,000.00
1.00 37,960,000.00 37,960,000.00
3,486,072,738.54 ###
348,607,273.85
3,834,680,012.39
3,834,680,000.00 ###
Sketsa Perhitungan
Beton No Keterangan
a. Panjang
b. Lebar
c. Tinggi
c. Jumlah
Total
Bill Of Quantity
Location Jambi
Work Item Kolom Pedestal
Sketsa Perhitungan
Beton No Keterangan
a. Panjang
b. Lebar
c. Tinggi
c. Jumlah
Total
Bill Of Quantity
Location Jambi
Work Item Pile Cap
Sketsa Perhitungan
Sketsa Perhitungan
Perhitungan
= 3.2 M3
Perhitungan
= 0.5 M3
Perhitungan
Perhitungan
le Cap
0.8 0.8 12.8
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Profil Baja H Beam 200 x 200
Sketsa Perhitungan
Total Berat =
200
=
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Profil Baja IWF 200 x 100
Sketsa Perhitungan
100 =
100
200
100 =
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Profil Baja CNP 100 x 50
Sketsa Perhitungan
Total Berat =
Total Berat =
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Plat Baja
Sketsa Perhitungan
Total Berat =
=
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Plat Baja
Sketsa Perhitungan
Total Berat =
No Keterangan
a. Jumlah
b. Panjang
c. Berat / m
Total Berat =
No Keterangan
a. Jumlah
b. Panjang
c. Berat / m
Total Berat =
Total
Perhitungan
Volume Satuan
10 buah
12 m
49.92 kg /m
10 x 12 x 49,92
5,989.9 Kg
Perhitungan
Volume Satuan
10 buah
6 m
21.33 kg /m
10 x 6 x 21,33
1,280.0 Kg
Volume Satuan
18 buah
26.2 m
21.33 kg /m
12 x 20 x 21,33
10,060.6 Kg
Perhitungan
Volume Satuan
5 buah
20 m
5.50 kg /m
5 x 20 x 6,77
550.0 Kg
Volume Satuan
8 buah
6 m
18.80 kg /m
8 x 6 x 18.8
902.4 Kg
Perhitungan
Volume Satuan
90 buah
0.22 m
7.17 kg /m
90 x 0.22x 7.17
142.0 Kg
Perhitungan
Volume Satuan
180 buah
0.18 m
7.17 kg /m
90 x 0.18x 7.17
232.3 Kg
Volume Satuan
96 buah
0.5 m
7.17 kg /m
90 x 0.18x 7.17
344.2 Kg
Volume Satuan
20 buah
0.5 m
7.17 kg /m
20 x 0.5x 7.17
71.7 Kg
790.13
Bill Of Quanti
Location
Work Item
Sketsa
10m
LANTAI D
3,5m
Bill Of Quanti
Location
Work Item
Sketsa
Bill Of Quanti
Location
Work Item
Sketsa
Bill Of Quanti
Location
Work Item
Sketsa
Bill Of Quantity
Jambi
6.7 m
Pengadaan dan Pemasangan Bekisting Rigid Lantai D
Sketsa
10m
LANTAI D
6.7 m
3,5m
Bill Of Quantity
Jambi
Pengadaan dan Pemasangan Bekisting Rigid Access Road
Sketsa
Bill Of Quantity
Jambi
Pengecoran Rigid Lantai D
Sketsa
Bill Of Quantity
Jambi
Pengecoran Rigid Access Road
Sketsa
Perhitungan
Perhitungan
Perhitungan
Pekerjaan Pengecoran
Volume Rigid = Luas Rigid x Tebal Rigid
= ((10x 28)) x 0,3
= 140.28 m3
= 140.20 m3
Perhitungan
Pekerjaan Pengecoran
Volume Rigid = Luas Rigid x Tebal Rigid
= ((108 x 6,7) + (28 x 6,7)) x 0,3
= 273.36 m3
= 272.87 m3
Bill Of Quantity
Location Jambi
Work Item Urugan Pasir Pondasi
Sketsa Perhitungan
No Keterangan
a. Lebar Alas Bawah
b. Tinggi
c. Panjang
Volume =
No Keterangan
a. Lebar Alas Bawah
b. Tinggi
c. Panjang
Volume =
No Keterangan
a. Lebar Alas Bawah
b. Tinggi
c. Panjang
Volume =
TOTAL :
Bill Of Quantity
Location Jambi
Work Item Urugan Pasir Plat Lantai A
Sketsa Perhitungan
Sketsa Perhitungan
Volume =
=
No Keterangan
a. Panjang
b. Lebar
c. Tinggi
Volume =
=
No Keterangan
a. Panjang
b. Lebar
c. Tinggi
Volume =
=
TOTAL :
Bill Of Quantity
Location Jambi
Work Item Urugan Pasir Plat Access Road
Sketsa Perhitungan
Volume Satuan
0.3 m
0.15 m
72 m
3.08 m3
Volume Satuan
1.5 m
0.1 m
84.7 m
12.705 m3
Volume Satuan
3 m
0.1 m
28 m
3 x 0.10 x 28
8.4 m3
24.19 m3
Perhitungan
Perhitungan
Volume Satuan
24 m
12 m
0.15 m
24 x 12 x 0,15
43.2 m3
Volume Satuan
24 m
10 m
0.1 m
24 x 3 x 0,10
24 m3
Volume Satuan
24 m
3 m
0.1 m
24 x 3 x 0,10
7.2 m3
74.40 m3
Perhitungan
Volume Satuan
108 m
6.7 m
0.15 m
28 m
6.7 m
((108 x 6,7)+(28 x 4.7)) x 0,15
136.68 m3
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Dinding Bata B
Sketsa
Dinding B No
a.
b.
c.
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Dinding Bata A
Sketsa
Dinding A
No
a.
b.
c.
d.
e.
12 12
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Dinding Bata C
Sketsa
Dinding C
No
a.
b.
f Quantity
Perhitungan
= 112.08 m3
f Quantity
Perhitungan
= 170.88 m3
f Quantity
Perhitungan
Luas Dinding I = 24 x 1
= 24.00 m3
Bill Of Quantity
Location Jambi
Work Item Beton
Sketsa Perhitungan
Bill Of Quantity
Location Jambi
Work Item Bekisting
Sketsa Perhitungan
Volume Beton = 70 m3
TOTAL : 108.03
m3
m3
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Plesteran Dinding Bata A
Sketsa Perhitungan
= 224.16 m2
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Plesteran Dinding Bata B
Sketsa Perhitungan
= 341.76 m2
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Plesteran Dinding Bata C
Sketsa Perhitungan
= 48.00 m2
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Beton Sloof
Sketsa Perhitungan
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Bekisting Sloof 40 x 25
Sketsa Perhitungan
Bill Of Quantity
Location
Work Item
Perhitungan Sketsa
Sloof 30x50
Panjang 72
Lebar 0.3
Tinggi 0.5
Tinggi 10.8
ing Sloof 40 x 25
Perhitungan
Bill Of Quantity
Jambi
Pekerjaan Pembesian Sloof
Sketsa Perhitungan
2 x (6 x Dtul)
2 x (6 x 0,012)
Panjang 1 Buah Tulangan
Lebar pondasi - (2*tebal selimut) +
panjang penyaluran
Sketsa
Atap I
Atap II
Bill Of Quantity
Jambi
Pekerjaan Atap
Sketsa
Perhitungan
Luas Atap I = 24 x 12
= 288.0 m2
Luas Atap I = 24 x 3
= 72.0 m2
TOTAL = 360.0 m2
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Pembesian Balok Dinding dan Kolom
Sketsa Perhitungan
Balok Dinding
Besi 4 ø 10
Besi ø 8 - 15
Besi 4 ø 10
Besi ø 8 - 10
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Bekisting Balok Dinding
Sketsa Perhitungan
Balok Dinding
Kolom
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Pengecoran Balok Dinding
Sketsa Perhitungan
Balok Dinding
Kolom
Bill Of Quantity
Perhitungan
1096.0775
Bill Of Quantity
ok Dinding
Perhitungan
Pekerjaan Bekisting
Volume Bekisting = 29.04 m2
= Panjang Balok * Tinggi Balok * 2
= 132 * 0.11 * 2
Pekerjaan Bekisting
Volume Bekisting
= Panjang Kolom * Tinggi Kolom * 2 32.56
Total 61.60
Bill Of Quantity
alok Dinding
Perhitungan
Panjang 24
96
120
Pekerjaan Pengecoran
Volume Balok = 1.45 m3
= Panjang Balok* Lebar Balok * Tinggi Balok
= 120 * 0.11 * 0.11
Pekerjaan Pengecoran
Volume Balok = 1.79 m3
= Panjang Kolom x Lebar Kolom x Tinggi Kolom
Total = 3.24
Bill Of Quantity
Location Jambi
Work Item Galian Tanah
Sketsa Perhitungan
= 47.00
= 9.75
= 17.33
TOTAL :
an
,5^2)+(2^2)+√(1,5^2)+(2^2))
m3
(1,5^2)+(1,5^2)+√(1,5^2)+(1,5^2))
m3
(1^2)+(1,5^2)+√(1^2)+(1,5^2))
m3
74.08 m3
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Lantai Kerja
Sketsa Perhitungan
Volume = 24 x 12 x 0.1
Volume = 24 x 3 x 0.5
=
Lantai C No Keterangan Volume
a. Panjang 24
b. Lebar 10
c. Tinggi 0.1
Volume = 24 x 10 x 0.1
=
Volume = 28 x 3 x 0.1
TOTAL :
ungan
Satuan
m
m
m
36 x 6.7 x 0.1
91.12 m3
Satuan
m
m
m
4 x 12 x 0.1
28.80 m3
Satuan
m
m
m
4 x 3 x 0.5
36.00 m3
Satuan
m
m
m
4 x 10 x 0.1
24.00 m3
Satuan
m
m
m
12.71 m3
Satuan
m
m
m
8 x 3 x 0.1
7.00 m3
199.63 m3
Bill Of Quantity
Location
Work Item
Sketsa
Bill Of Quantity
Location
Work Item
Sketsa
Bill Of Quantity
Jambi
Bore Pile
Sketsa Perhitu
Panjang
Jumlah
Panjang
Pembesian
7 D 16
70
26
51
1.26
Bill Of Quantity
Jambi
Beton Bore Pile
Sketsa Perhitu
No
a.
b.
c.
Perhitungan
Panjang = 10
Jumlah = 11 buah
Panjang = 12
= 5
170 m
Pembesian
7 D 16
x 1.758 123.06
x 2x 3.14 x0.2 32.656
x 2x 3.14 x0.2 64.056
219.772
1.26
175 Kg/m3
Perhitungan
3.14 x r2 x t x 14
17.58
Bill Of Quantity
Location
Work Item
Sketsa
Lantai C
Bill Of Quantity
Location
Work Item
Sketsa
Lantai A
Bill Of Quantity
Location
Work Item
Sketsa
Lantai D
Bill Of Quantity
Location
Work Item
Sketsa
Bill Of Quantity
Jambi
Pengecoran Lantai Kerja Plat Lantai C
Sketsa Perhitung
No
a.
b.
c.
d.
e.
f.
Bill Of Quantity
Jambi
Pengecoran Lantai Kerja Plat Lantai A
Sketsa Perhitung
No
a.
b.
c.
d.
e.
f.
Bill Of Quantity
Jambi
Pengecoran Lantai Kerja Plat Lantai D
Sketsa Perhitung
No
a.
b.
c.
d.
e.
f.
g.
h.
Bill Of Quantity
Jambi
Pengecoran Lantai Kerja Access Road
Sketsa Perhitung
No
a.
b.
c.
d.
e.
f.
g.
h.
Perhitungan
Volume = 20 x 3 x 0,1
= 6.00 m3
Perhitungan
Volume = 20 x 12 x 0,1
= 24.00 m3
Perhitungan
= 103.54 m3
Perhitungan
= 80.36 m3
Bill Of Quantity
Location Jambi
Work Item Pekerjaan Bekisting Plat Lantai C
Sketsa Perhitu
Plat Lantai C
Of Quantity
Perhitungan
Plat C
Panjang Plat = 24 m
Lebar Plat = 3 m
Tebal Plat = 0,1 m
Pekerjaan Bekisting
Volume Bekisting Pelat = 72.0 m2
= Panjang Bekisting * Lebar Bekisting
= 20 x 3
Bill Of
Location
Work Item
Sketsa
Bill Of
Location
Work Item
Sketsa
Sketsa
Plat Lantai A
Bill Of Quantity
Jambi
Pembesian Wiremesh Plat Lantai A
Sketsa
Bill Of Quantity
Jambi
Pengadaan dan Pemasangan Bekisting Plat Lantai A
Sketsa
Sketsa
lat Lantai A
Quantity
Perhitungan
= 100 lembar
Quantity
Perhitungan
Panjang plat = 24 m
Lebar plat = 12 m
Tebal Plat = 0.25 m
Pekerjaan Bekisting
Volume Bekisting Plat = 12 x 24
= 288.0 m2
Quantity
Perhitungan
Pekerjaan Tulangan
Menggunakan WIREMESH m10
1 lembar = 2,1 x 5,4
Arah X
5,4 m X 4.5 buah = 24.3 m
Sesuai kebutuhan Panjang Plat = 24 m
Arah Y
2,1 m X 6 buah = 12.6 m
Sesuai kebutuhan Lebar Plat = 12 m
Total = 4.5 x 6
= 27 lembar
Pekerjaan Pengecoran
= 71.33 m3
24.30
12.6