a b c d e f = (c x e)
A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 Rp 85,000.00 Rp 17,000.00
Tukang L.02 OH 0.400 Rp 100,000.00 Rp 40,000.00
Kepala Tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.020 Rp 95,000.00 Rp 1,900.00
JUMLAH TENAGA KERJA Rp 61,000.00
B BAHAN
Dolken kayu D.8-10/400cm Btg 1.250 Rp 20,000.00 Rp 25,000.00
Semen portland Kg 2.500 Rp 1,400.00 Rp 3,500.00
pasir beton M3 0.005 Rp 181,000.00 Rp 905.00
koral beton M3 0.009 Rp 432,300.00 Rp 3,890.70
kayu 5/7 M3 0.072 Rp 2,310,000.00 Rp 166,320.00
paku biasa 2"-5" Kg 0.060 Rp - Rp -
Seng Gelombang Lbr 1.200 Rp - Rp -
Meni Besi Liter 0.450 Rp - Rp -
A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 Rp 85,000.00 Rp 17,000.00
Tukang L.02 OH 0.300 Rp 100,000.00 Rp 30,000.00
Kepala Tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.020 Rp 95,000.00 Rp 1,900.00
JUMLAH TENAGA KERJA Rp 51,000.00
B BAHAN
Dolken kayu D.8-10/400cm Btg 1.000 Rp 20,000.00 Rp 20,000.00
Semen portland Kg 2.000 Rp 1,400.00 Rp 2,800.00
Kawat duri M1 25.000 Rp - Rp -
pasir beton M3 0.005 Rp 181,000.00 Rp 905.00
koral beton M3 0.009 Rp 432,300.00 Rp 3,890.70
paku biasa 2"-5" Kg 0.060 Rp - Rp -
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB: 3 Kr dan 40% batu belah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.400 Rp 85,000.00 Rp 289,000.00
Tukang L.02 OH 0.850 Rp 100,000.00 Rp 85,000.00
Kepala Tukang L.03 OH 0.085 Rp 105,000.00 Rp 8,925.00
Mandor L.04 OH 0.170 Rp 95,000.00 Rp 16,150.00
JUMLAH TENAGA KERJA Rp 399,075.00
B BAHAN
Batu Belah M3 0.480 Rp 350,000.00 Rp 168,000.00
Semen Portland Kg 194.000 Rp 1,400.00 Rp 271,600.00
Pasir Beton M3 0.312 Rp 181,000.00 Rp 56,472.00
Kerikil M3 0.468 Rp 275,000.00 Rp 128,700.00
Besi Beton Kg 126.000 Rp - Rp -
Kawat Beton Kg 1.800 Rp - Rp -
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
A.A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 Rp 85,000.00 Rp 102,000.00
Tukang L.02 OH 0.200 Rp 100,000.00 Rp 20,000.00
Kepala Tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.060 Rp 95,000.00 Rp 5,700.00
JUMLAH TENAGA KERJA Rp 129,800.00
B BAHAN
Semen Portland Kg 230.000 Rp 1,400.00 Rp 322,000.00
Pasir Beton Kg 893.000 Rp 129.29 Rp 115,452.14
Kerikir (Maksimal 30mm) Kg 1027.000 Rp 203.70 Rp 209,203.70
Air Liter 200.000 Rp 66.67 Rp 13,333.33
A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 Rp 85,000.00 Rp 140,250.00
Tukang L.02 OH 0.275 Rp 100,000.00 Rp 27,500.00
Kepala Tukang L.03 OH 0.028 Rp 105,000.00 Rp 2,940.00
Mandor L.04 OH 0.083 Rp 95,000.00 Rp 7,885.00
JUMLAH TENAGA KERJA Rp 178,575.00
B BAHAN
Semen Portland Kg 326.000 Rp 1,400.00 Rp 456,400.00
Pasir Beton Kg 760.000 Rp 129.29 Rp 98,257.14
Kerikir (Maksimal 30mm) Kg 1029.000 Rp 203.70 Rp 209,611.11
Air Liter 215.000 Rp 66.67 Rp 14,333.33
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (K350)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 Rp 85,000.00 Rp 178,500.00
Tukang L.02 OH 0.350 Rp 100,000.00 Rp 35,000.00
Kepala Tukang L.03 OH 0.035 Rp 105,000.00 Rp 3,675.00
Mandor L.04 OH 0.105 Rp 95,000.00 Rp 9,975.00
JUMLAH TENAGA KERJA Rp 227,150.00
B BAHAN
Semen Portland Kg 448.000 Rp 1,400.00 Rp 627,200.00
Pasir Beton Kg 667.000 Rp 129.29 Rp 86,233.57
Kerikir (Maksimal 30mm) Kg 1000.000 Rp 203.70 Rp 203,703.70
Air Liter 215.000 Rp 66.67 Rp 14,333.33
A.4.1.1.28.
A.4.1.1.29.
A.4.1.1.30.
A.4.1.1.31.
A.4.1.1.32.
A.4.1.1.33.
A.4.1.1.34.
A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.132 Rp 85,000.00 Rp 11,220.00
Tukang L.02 OH 0.022 Rp 100,000.00 Rp 2,200.00
Kepala Tukang L.03 OH 0.002 Rp 105,000.00 Rp 210.00
Mandor L.04 OH 0.007 Rp 95,000.00 Rp 665.00
JUMLAH TENAGA KERJA Rp 14,295.00
B BAHAN
Semen Portland Kg 26.080 Rp 1,400.00 Rp 36,512.00
Pasir Beton Kg 60.800 Rp 129.29 Rp 7,860.57
Kerikir (Maksimal 30mm) Kg 82.320 Rp 203.70 Rp 16,768.89
Air Liter 17.200 Rp 66.67 Rp 1,146.67
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.165 Rp 85,000.00 Rp 14,025.00
Tukang L.02 OH 0.028 Rp 100,000.00 Rp 2,800.00
Kepala Tukang L.03 OH 0.003 Rp 105,000.00 Rp 315.00
Mandor L.04 OH 0.008 Rp 95,000.00 Rp 760.00
JUMLAH TENAGA KERJA Rp 17,900.00
B BAHAN
Semen Portland Kg 32.600 Rp 1,400.00 Rp 45,640.00
Pasir Beton Kg 76.600 Rp 129.29 Rp 9,903.29
Kerikir (Maksimal 30mm) Kg 102.900 Rp 203.70 Rp 20,961.11
Air Liter 21.500 Rp 66.67 Rp 1,433.33
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.198 Rp 85,000.00 Rp 16,830.00
Tukang L.02 OH 0.033 Rp 100,000.00 Rp 3,300.00
Kepala Tukang L.03 OH 0.003 Rp 105,000.00 Rp 315.00
Mandor L.04 OH 0.010 Rp 95,000.00 Rp 950.00
JUMLAH TENAGA KERJA Rp 21,395.00
B BAHAN
Semen Portland Kg 39.120 Rp 1,400.00 Rp 54,768.00
Pasir Beton Kg 91.200 Rp 129.29 Rp 11,790.86
Kerikir (Maksimal 30mm) Kg 123.480 Rp 203.70 Rp 25,153.33
Air Liter 25.800 Rp 66.67 Rp 1,720.00
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.248 Rp 85,000.00 Rp 21,080.00
Tukang L.02 OH 0.041 Rp 100,000.00 Rp 4,100.00
Kepala Tukang L.03 OH 0.004 Rp 105,000.00 Rp 420.00
Mandor L.04 OH 0.013 Rp 95,000.00 Rp 1,235.00
JUMLAH TENAGA KERJA Rp 26,835.00
B BAHAN
Semen Portland Kg 48.900 Rp 1,400.00 Rp 68,460.00
Pasir Beton Kg 114.000 Rp 129.29 Rp 14,738.57
Kerikir (Maksimal 30mm) Kg 154.350 Rp 203.70 Rp 31,441.67
Air Liter 32.250 Rp 66.67 Rp 2,150.00
A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 Rp 85,000.00 Rp 89,250.00
Tukang L.02 OH 1.050 Rp 100,000.00 Rp 105,000.00
Kepala Tukang L.03 OH 0.105 Rp 105,000.00 Rp 11,025.00
Mandor L.04 OH 0.052 Rp 95,000.00 Rp 4,940.00
JUMLAH TENAGA KERJA Rp 210,215.00
B BAHAN
Besi Siku L30.30.3 Kg 15.000 Rp - Rp -
Besi Plat Baja Kg 32.800 Rp - Rp -
Kawat Las Kg 0.050 Rp - Rp -
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 Rp 85,000.00 Rp 12,750.00
Tukang L.02 OH 0.300 Rp 100,000.00 Rp 30,000.00
Kepala Tukang L.03 OH 0.030 Rp 105,000.00 Rp 3,150.00
Mandor L.04 OH 0.008 Rp 95,000.00 Rp 760.00
JUMLAH TENAGA KERJA Rp 46,660.00
B BAHAN
Seng Pelat M 1.050 Rp - Rp -
Paku 1 cm -2,5 cm Kg 0.010 Rp - Rp -
Papan Kayu kelas II atau III Kg 0.500 Rp 3,345,000.00 Rp 1,672,500.00
A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 Rp 85,000.00 Rp 21,250.00
Tukang L.02 OH 0.250 Rp 100,000.00 Rp 25,000.00
Kepala Tukang L.03 OH 0.025 Rp 105,000.00 Rp 2,625.00
Mandor L.04 OH 0.013 Rp 95,000.00 Rp 1,235.00
JUMLAH TENAGA KERJA Rp 50,110.00
B BAHAN
Rangka metal hollow 40.40.2
M1 3.500 Rp - Rp -
mm
Assesoris (perkuatan, las dll ) Ls 1.000 Rp - Rp -
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 Rp 85,000.00 Rp 29,750.00
Tukang L.02 OH 0.350 Rp 100,000.00 Rp 35,000.00
Kepala Tukang L.03 OH 0.035 Rp 105,000.00 Rp 3,675.00
Mandor L.04 OH 0.018 Rp 95,000.00 Rp 1,710.00
JUMLAH TENAGA KERJA Rp 70,135.00
B BAHAN
Rangka metal hollow 40.40.2 M1 4.000 Rp - Rp -
mm
Assesoris (perkuatan, las dll ) Ls 1.000 Rp - Rp -
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.734 Rp 85,000.00 Rp 62,390.00
Tukang L.02 OH 0.734 Rp 100,000.00 Rp 73,400.00
Kepala Tukang L.03 OH 0.073 Rp 105,000.00 Rp 7,665.00
Mandor L.04 OH 0.037 Rp 95,000.00 Rp 3,515.00
JUMLAH TENAGA KERJA Rp 146,970.00
B BAHAN
Baja Ringan Canai Dingin C75 Kg 3.065 Rp - Rp -
A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.734 Rp 85,000.00 Rp 62,390.00
Tukang L.02 OH 0.734 Rp 100,000.00 Rp 73,400.00
Kepala Tukang L.03 OH 0.073 Rp 105,000.00 Rp 7,665.00
Mandor L.04 OH 0.037 Rp 95,000.00 Rp 3,515.00
JUMLAH TENAGA KERJA Rp 146,970.00
B BAHAN
Baja Ringan Canai Dingin C75 Kg 4.050 Rp - Rp -
A.4.2.1.23. (K3) Pemasangan 1 m2 atap rangka atap baja ringan Atap Spandek/Asbes
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 Rp 85,000.00 Rp 17,000.00
Tukang L.02 OH 0.450 Rp 100,000.00 Rp 45,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.050 Rp 95,000.00 Rp 4,750.00
JUMLAH TENAGA KERJA Rp 67,800.00
B BAHAN
C-75 . 0,8 M 1.488 Rp - Rp -
C-75 . 0,6 M 2.232 Rp - Rp -
Baut (screw driver) Bh 28.000 Rp - Rp -
dynabolt Bh 1.600 Rp - Rp -
reng M 2.600 Rp - Rp -
talang jurai M 0.124 Rp - Rp -
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batucampuran 1SP : 2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 Rp 85,000.00 Rp 51,000.00
Tukang L.02 OH 0.200 Rp 100,000.00 Rp 20,000.00
Kepala Tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.030 Rp 95,000.00 Rp 2,850.00
JUMLAH TENAGA KERJA Rp 75,950.00
B BAHAN
Batu Merah Buah 140.000 Rp 605.00 Rp 84,700.00
Semen Portland Kg 43.500 Rp 1,400.00 Rp 60,900.00
Pasir Pasang M3 0.080 Rp 149,000.00 Rp 11,920.00
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 Rp 85,000.00 Rp 51,000.00
Tukang L.02 OH 0.200 Rp 100,000.00 Rp 20,000.00
Kepala Tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.030 Rp 95,000.00 Rp 2,850.00
JUMLAH TENAGA KERJA Rp 75,950.00
B BAHAN
Batu Merah Buah 140.000 Rp 605.00 Rp 84,700.00
Semen Portland Kg 32.950 Rp 1,400.00 Rp 46,130.00
Pasir Pasang M3 0.091 Rp 149,000.00 Rp 13,559.00
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 Rp 85,000.00 Rp 51,000.00
Tukang L.02 OH 0.200 Rp 100,000.00 Rp 20,000.00
Kepala Tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.030 Rp 95,000.00 Rp 2,850.00
JUMLAH TENAGA KERJA Rp 75,950.00
B BAHAN
Batu Merah Buah 140.000 Rp 605.00 Rp 84,700.00
Semen Portland Kg 26.550 Rp 1,400.00 Rp 37,170.00
Pasir Pasang M3 0.093 Rp 149,000.00 Rp 13,857.00
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 Rp 85,000.00 Rp 51,000.00
Tukang L.02 OH 0.200 Rp 100,000.00 Rp 20,000.00
Kepala Tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.030 Rp 95,000.00 Rp 2,850.00
JUMLAH TENAGA KERJA Rp 75,950.00
B BAHAN
Batu Merah Buah 140.000 Rp 605.00 Rp 84,700.00
Semen Portland Kg 22.200 Rp 1,400.00 Rp 31,080.00
Pasir Pasang M3 0.102 Rp 149,000.00 Rp 15,198.00
A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 Rp 85,000.00 Rp 51,000.00
Tukang L.02 OH 0.200 Rp 100,000.00 Rp 20,000.00
Kepala Tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.030 Rp 95,000.00 Rp 2,850.00
JUMLAH TENAGA KERJA Rp 75,950.00
B BAHAN
Batu Merah Buah 140.000 Rp 605.00 Rp 84,700.00
Semen Portland Kg 18.500 Rp 1,400.00 Rp 25,900.00
Pasir Pasang M3 0.122 Rp 149,000.00 Rp 18,178.00
A. 4.4.1.6 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 Rp 85,000.00 Rp 51,000.00
Tukang L.02 OH 0.200 Rp 100,000.00 Rp 20,000.00
Kepala Tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.030 Rp 95,000.00 Rp 2,850.00
JUMLAH TENAGA KERJA Rp 75,950.00
B BAHAN
Batu Merah Buah 140.000 Rp 605.00 Rp 84,700.00
Semen Portland Kg 10.080 Rp 1,400.00 Rp 14,112.00
Pasir Pasang M3 0.093 Rp 149,000.00 Rp 13,782.50
Kapur Padam M3 0.028 Rp - Rp -
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 37,975.00
B BAHAN
Batu Merah Buah 70.000 Rp 605.00 Rp 42,350.00
Semen Portland Kg 18.950 Rp 1,400.00 Rp 26,530.00
Pasir Pasang M3 0.038 Rp 149,000.00 Rp 5,662.00
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 37,975.00
B BAHAN
Batu Merah Buah 70.000 Rp 605.00 Rp 42,350.00
Semen Portland Kg 14.370 Rp 1,400.00 Rp 20,118.00
Pasir Pasang M3 0.040 Rp 149,000.00 Rp 5,960.00
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 37,975.00
B BAHAN
Batu Merah Buah 70.000 Rp 605.00 Rp 42,350.00
Semen Portland Kg 11.500 Rp 1,400.00 Rp 16,100.00
Pasir Pasang M3 0.043 Rp 149,000.00 Rp 6,407.00
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 5PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 37,975.00
B BAHAN
Batu Merah Buah 70.000 Rp 605.00 Rp 42,350.00
Semen Portland Kg 9.680 Rp 1,400.00 Rp 13,552.00
Pasir Pasang M3 0.045 Rp 149,000.00 Rp 6,705.00
A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 37,975.00
B BAHAN
Batu Merah Buah 70.000 Rp 605.00 Rp 42,350.00
Semen Portland Kg 8.300 Rp 1,400.00 Rp 11,620.00
Pasir Pasang M3 0.049 Rp 149,000.00 Rp 7,301.00
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 37,975.00
B BAHAN
Batu Merah Buah 70.000 Rp 605.00 Rp 42,350.00
Semen Portland Kg 6.500 Rp 1,400.00 Rp 9,100.00
Pasir Pasang M3 0.050 Rp 149,000.00 Rp 7,450.00
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 37,975.00
B BAHAN
Batu Merah Buah 70.000 Rp 605.00 Rp 42,350.00
Semen Portland Kg 4.500 Rp 1,400.00 Rp 6,300.00
Pasir Pasang M3 0.050 Rp 149,000.00 Rp 7,450.00
Kapur Padam M3 0.015 Rp - Rp -
A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 37,975.00
B BAHAN
Batu Merah Buah 70.000 Rp 605.00 Rp 42,350.00
Semen Portland Kg 0.018 Rp 1,400.00 Rp 25.20
Pasir Pasang M3 0.018 Rp 149,000.00 Rp 2,682.00
Kapur Padam M3 0.018 Rp - Rp -
A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 37,975.00
B BAHAN
Batu Merah Buah 70.000 Rp 605.00 Rp 42,350.00
Semen Portland Kg 0.014 Rp 1,400.00 Rp 19.60
Pasir Pasang M3 0.028 Rp 149,000.00 Rp 4,172.00
Kapur Padam M3 0.014 Rp - Rp -
A. 4.4.1.24 Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.150 Rp 100,000.00 Rp 15,000.00
Kepala Tukang L.03 OH 0.015 Rp 105,000.00 Rp 1,575.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 43,500.00
B BAHAN
Bata Rooster Bh 70.000 Rp 33,000.00 Rp 2,310,000.00
Semen Portland Kg 14.000 Rp 1,400.00 Rp 19,600.00
Pasir Pasang M3 0.032 Rp 149,000.00 Rp 4,768.00
A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.150 Rp 100,000.00 Rp 15,000.00
Kepala Tukang L.03 OH 0.015 Rp 105,000.00 Rp 1,575.00
Mandor L.04 OH 0.015 Rp 95,000.00 Rp 1,425.00
JUMLAH TENAGA KERJA Rp 43,500.00
B BAHAN
Bata Ringan tebal 7.5cm' Bh 8.400 Rp - Rp -
Semen Portland Kg 3.400 Rp 1,400.00 Rp 4,760.00
Pasir Pasang M3 0.020 Rp 149,000.00 Rp 2,980.00
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 Rp 85,000.00 Rp 25,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.001 Rp 95,000.00 Rp 95.00
JUMLAH TENAGA KERJA Rp 36,645.00
B BAHAN
Bata Ringan T.10cm Bh 8.400 Rp - Rp -
Semen Portland Kg 5.400 Rp 1,400.00 Rp 7,560.00
Pasir Pasang M3 0.025 Rp 149,000.00 Rp 3,725.00
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 Rp 85,000.00 Rp 5,950.00
Tukang L.02 OH 0.035 Rp 100,000.00 Rp 3,500.00
Kepala Tukang L.03 OH 0.004 Rp 105,000.00 Rp 420.00
Mandor L.04 OH 0.004 Rp 95,000.00 Rp 380.00
JUMLAH TENAGA KERJA Rp 10,250.00
B BAHAN
PC Kg 6.340 Rp 1,400.00 Rp 8,876.00
PP Kg 0.012 Rp 149,000.00 Rp 1,788.00
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 Rp 85,000.00 Rp 8,500.00
Tukang L.02 OH 0.100 Rp 100,000.00 Rp 10,000.00
Kepala Tukang L.03 OH 0.010 Rp 105,000.00 Rp 1,050.00
Mandor L.04 OH 0.005 Rp 95,000.00 Rp 475.00
JUMLAH TENAGA KERJA Rp 20,025.00
B BAHAN
Tripleks Lbr 0.375 Rp 91,666.00 Rp 34,374.75
Paku Tripleks Kg 0.030 Rp - Rp -
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 Rp 85,000.00 Rp 42,500.00
Tukang L.02 OH 0.500 Rp 100,000.00 Rp 50,000.00
Kepala Tukang L.03 OH 0.050 Rp 105,000.00 Rp 5,250.00
Mandor L.04 OH 0.025 Rp 95,000.00 Rp 2,375.00
JUMLAH TENAGA KERJA Rp 100,125.00
B BAHAN
Profit Allum T m 3.600 Rp - Rp -
Kawat D.4mm Kg 0.150 Rp - Rp -
Ramset Bh 1.050 Rp - Rp -
Akustik 60 x 120 Lbr 1.500 Rp 28,000.00 Rp 42,000.00
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 Rp 85,000.00 Rp 595,000.00
Tukang L.02 OH 21.000 Rp 100,000.00 Rp 2,100,000.00
Kepala Tukang L.03 OH 2.100 Rp 105,000.00 Rp 220,500.00
Mandor L.04 OH 0.035 Rp 95,000.00 Rp 3,325.00
JUMLAH TENAGA KERJA Rp 2,918,825.00
B BAHAN
Balok Kayu M3 1.100 Rp 4,496,000.00 Rp 4,945,600.00
Paku 10cm Kg 1.250 Rp - Rp -
Lem Kayu Kg 1.000 Rp - Rp -
A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 Rp 85,000.00 Rp 510,000.00
Tukang L.02 OH 18.000 Rp 100,000.00 Rp 1,800,000.00
Kepala Tukang L.03 OH 1.800 Rp 105,000.00 Rp 189,000.00
Mandor L.04 OH 0.300 Rp 95,000.00 Rp 28,500.00
JUMLAH TENAGA KERJA Rp 2,527,500.00
B BAHAN
Balok Kayu M3 1.200 Rp 3,283,000.00 Rp 3,939,600.00
Paku 10cm Kg 1.250 Rp - Rp -
Lem Kayu Kg 1.000 Rp - Rp -
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 Rp 85,000.00 Rp 85,000.00
Tukang L.02 OH 3.000 Rp 100,000.00 Rp 300,000.00
Kepala Tukang L.03 OH 0.300 Rp 105,000.00 Rp 31,500.00
Mandor L.04 OH 0.050 Rp 95,000.00 Rp 4,750.00
JUMLAH TENAGA KERJA Rp 421,250.00
B BAHAN
Papan Kayu M3 0.040 Rp 3,345,000.00 Rp 133,800.00
Lem Kayu Kg 0.500 Rp - Rp -
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 Rp 85,000.00 Rp 68,000.00
Tukang L.02 OH 2.400 Rp 100,000.00 Rp 240,000.00
Kepala Tukang L.03 OH 0.240 Rp 105,000.00 Rp 25,200.00
Mandor L.04 OH 0.040 Rp 95,000.00 Rp 3,800.00
JUMLAH TENAGA KERJA Rp 337,000.00
B BAHAN
Papan Kayu M3 0.024 Rp 3,345,000.00 Rp 80,280.00
Lem Kayu Kg 0.300 Rp - Rp -
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 Rp 85,000.00 Rp 85,000.00
Tukang L.02 OH 3.000 Rp 100,000.00 Rp 300,000.00
Kepala Tukang L.03 OH 0.300 Rp 105,000.00 Rp 31,500.00
Mandor L.04 OH 0.050 Rp 95,000.00 Rp 4,750.00
JUMLAH TENAGA KERJA Rp 421,250.00
B BAHAN
Papan Kayu M3 0.064 Rp 3,345,000.00 Rp 214,080.00
Lem Kayu Kg 0.500 Rp - Rp -
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 Rp 85,000.00 Rp 59,500.00
Tukang L.02 OH 2.100 Rp 100,000.00 Rp 210,000.00
Kepala Tukang L.03 OH 0.210 Rp 105,000.00 Rp 22,050.00
Mandor L.04 OH 0.035 Rp 95,000.00 Rp 3,325.00
JUMLAH TENAGA KERJA Rp 294,875.00
B BAHAN
Papan Kayu M3 0.025 Rp 3,345,000.00 Rp 83,625.00
Paku 1cm = 2.5cm Kg 0.030 Rp - Rp -
Lem Kayu Kg 0.500 Rp - Rp -
Plywood tebal 4 mm Uk.90cm x Lbr 1.000 Rp 85,000.00 Rp 85,000.00
220cm
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 Rp 85,000.00 Rp 68,000.00
Tukang L.02 OH 2.400 Rp 100,000.00 Rp 240,000.00
Kepala Tukang L.03 OH 0.240 Rp 105,000.00 Rp 25,200.00
Mandor L.04 OH 0.040 Rp 95,000.00 Rp 3,800.00
JUMLAH TENAGA KERJA Rp 337,000.00
B BAHAN
Papan Kayu M3 0.026 Rp 4,500,000.00 Rp 115,200.00
Paku 1cm = 2.5cm Kg 0.030 Rp - Rp -
Lem Kayu Kg 0.500 Rp - Rp -
Plywood tebal 4 mm Uk.90cm x Lbr 1.000 Rp 85,000.00 Rp 85,000.00
220cm
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.850 Rp 85,000.00 Rp 72,250.00
Tukang L.02 OH 2.550 Rp 100,000.00 Rp 255,000.00
Kepala Tukang L.03 OH 0.255 Rp 105,000.00 Rp 26,775.00
Mandor L.04 OH 0.043 Rp 95,000.00 Rp 4,085.00
JUMLAH TENAGA KERJA Rp 358,110.00
B BAHAN
Papan Kayu M3 0.025 Rp 3,345,000.00 Rp 83,625.00
Paku 1cm = 2.5cm Kg 0.030 Rp - Rp -
Lem Kayu Kg 0.800 Rp - Rp -
Teakwood 4mm Uk.90cm x
Lbr 1.000 Rp 85,000.00
220cm Rp 85,000.00
Formika Lbr 0.500 Rp - Rp -
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 Rp 85,000.00 Rp 340,000.00
Tukang L.02 OH 12.000 Rp 100,000.00 Rp 1,200,000.00
Kepala Tukang L.03 OH 1.100 Rp 105,000.00 Rp 115,500.00
Mandor L.04 OH 0.200 Rp 95,000.00 Rp 19,000.00
JUMLAH TENAGA KERJA Rp 1,674,500.00
B BAHAN
Balok Kayu M3 1.100 Rp 4,496,000.00 Rp 4,945,600.00
Besi Strip T.5mm Kg 15.000 Rp - Rp -
Paku 12cm Kg 5.600 Rp - Rp -
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 Rp 85,000.00 Rp 12,750.00
Tukang L.02 OH 0.300 Rp 100,000.00 Rp 30,000.00
Kepala Tukang L.03 OH 0.030 Rp 105,000.00 Rp 3,150.00
Mandor L.04 OH 0.075 Rp 95,000.00 Rp 7,125.00
JUMLAH TENAGA KERJA Rp 53,025.00
B BAHAN
Kaso 5 x 7 M3 0.015 Rp 3,283,000.00 Rp 50,558.20
Paku 7 - 10 cm Kg 0.200 Rp - Rp -
A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 Rp 85,000.00 Rp 17,000.00
Tukang L.02 OH 0.300 Rp 100,000.00 Rp 30,000.00
Kepala Tukang L.03 OH 0.030 Rp 105,000.00 Rp 3,150.00
Mandor L.04 OH 0.010 Rp 95,000.00 Rp 950.00
JUMLAH TENAGA KERJA Rp 51,100.00
B BAHAN
Kaso 5 x 7 M3 0.016 Rp 3,283,000.00 Rp 53,512.90
Paku 7 - 10 cm Kg 0.250 Rp - Rp -
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 Rp 85,000.00 Rp 8,500.00
Tukang L.02 OH 0.200 Rp 100,000.00 Rp 20,000.00
Kepala Tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.005 Rp 95,000.00 Rp 475.00
JUMLAH TENAGA KERJA Rp 31,075.00
B BAHAN
Papan Kayu M3 0.011 Rp 4,500,000.00 Rp 48,600.00
Paku 5 - 7 cm Kg 0.100 Rp - Rp -
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 Rp 85,000.00 Rp 12,750.00
Tukang L.02 OH 0.450 Rp 100,000.00 Rp 45,000.00
Kepala Tukang L.03 OH 0.045 Rp 105,000.00 Rp 4,725.00
Mandor L.04 OH 0.008 Rp 95,000.00 Rp 760.00
JUMLAH TENAGA KERJA Rp 63,235.00
B BAHAN
Balok Kayu M3 0.028 Rp 2,310,000.00 Rp 64,680.00
Paku 5 - 7 cm Kg 0.150 Rp - Rp -
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 Rp 85,000.00 Rp 5,950.00
Tukang L.02 OH 0.009 Rp 100,000.00 Rp 900.00
Kepala Tukang L.03 OH 0.006 Rp 105,000.00 Rp 630.00
Mandor L.04 OH 0.003 Rp 95,000.00 Rp 285.00
JUMLAH TENAGA KERJA Rp 7,765.00
B BAHAN
Cat Menie Kg 0.200 Rp - Rp -
Plammur Kg 0.150 Rp - Rp -
Cat Dasar Kg 0.170 Rp - Rp -
Cat Penutup Kg 0.260 Rp - Rp -
Kuas Bh 0.010 Rp - Rp -
Pengencer Kg 0.030 Rp - Rp -
Amplas Lbr 0.200 Rp - Rp -
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 Rp 85,000.00 Rp 5,950.00
Tukang L.02 OH 0.105 Rp 100,000.00 Rp 10,500.00
Kepala Tukang L.03 OH 0.004 Rp 105,000.00 Rp 420.00
Mandor L.04 OH 0.003 Rp 95,000.00 Rp 285.00
JUMLAH TENAGA KERJA Rp 17,155.00
B BAHAN
Cat Menie Kg 0.200 Rp - Rp -
Plammur Kg 0.150 Rp - Rp -
Cat Dasar Kg 0.170 Rp - Rp -
Cat Penutup Kg 0.350 Rp - Rp -
Kuas Bh 0.010 Rp - Rp -
Pengencer Kg 0.030 Rp - Rp -
Amplas Lbr 0.200 Rp - Rp -
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 Rp 85,000.00 Rp 1,700.00
Tukang L.02 OH 0.063 Rp 100,000.00 Rp 6,300.00
Kepala Tukang L.03 OH 0.006 Rp 105,000.00 Rp 661.50
Mandor L.04 OH 0.003 Rp 95,000.00 Rp 285.00
JUMLAH TENAGA KERJA Rp 8,946.50
B BAHAN
Plammur Kg 0.100 Rp - Rp -
Cat Dasar Kg 0.100 Rp - Rp -
Cat Penutup Kg 0.260 Rp - Rp -
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 Rp 85,000.00 Rp 2,380.00
Tukang L.02 OH 0.042 Rp 100,000.00 Rp 4,200.00
Kepala Tukang L.03 OH 0.004 Rp 105,000.00 Rp 441.00
Mandor L.04 OH 0.003 Rp 95,000.00 Rp 285.00
JUMLAH TENAGA KERJA Rp 7,306.00
B BAHAN
Cat Dasar Kg 0.120 Rp - Rp -
Cat Penutup Kg 0.180 Rp - Rp -
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 Rp 85,000.00 Rp 5,100.00
Tukang L.02 OH 0.060 Rp 100,000.00 Rp 6,000.00
Kepala Tukang L.03 OH 0.012 Rp 105,000.00 Rp 1,260.00
Mandor L.04 OH 0.003 Rp 95,000.00 Rp 285.00
JUMLAH TENAGA KERJA Rp 12,645.00
B BAHAN
Cat Kg 0.300 Rp - Rp -
Kwas Bh 0.010 Rp - Rp -
Pengencer Liter 0.010 Rp - Rp -
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 Rp 85,000.00 Rp 34,000.00
Tukang L.02 OH 0.700 Rp 100,000.00 Rp 70,000.00
Kepala Tukang L.03 OH 0.070 Rp 105,000.00 Rp 7,350.00
Mandor L.04 OH 0.020 Rp 95,000.00 Rp 1,900.00
JUMLAH TENAGA KERJA Rp 113,250.00
B BAHAN
Cat Dasar Kg 0.300 Rp - Rp -
Pengencer Kliter 0.010 Rp - Rp -
A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 Rp 85,000.00 Rp 510,000.00
Tukang L.02 OH 3.000 Rp 100,000.00 Rp 300,000.00
Kepala Tukang L.03 OH 0.300 Rp 105,000.00 Rp 31,500.00
Mandor L.04 OH 0.030 Rp 95,000.00 Rp 2,850.00
JUMLAH TENAGA KERJA Rp 844,350.00
B BAHAN
Bata Merah Bh 150.000 Rp 605.00 Rp 90,750.00
Semen Portland Kg 120.000 Rp 1,400.00 Rp 168,000.00
Pasir Pasang M3 0.300 Rp 149,000.00 Rp 44,700.00
Porseren 11 x 11 Bh 360.000 Rp - Rp -
Semen Warna Kg 6.000 Rp 12,000.00 Rp 72,000.00
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.160 Rp 85,000.00 Rp 183,600.00
Tukang L.02 OH 0.720 Rp 100,000.00 Rp 72,000.00
Kepala Tukang L.03 OH 0.072 Rp 105,000.00 Rp 7,560.00
Mandor L.04 OH 0.011 Rp 95,000.00 Rp 1,045.00
JUMLAH TENAGA KERJA Rp 264,205.00
B BAHAN
Bata Merah Bh 40.000 Rp 605.00 Rp 24,200.00
Semen Portland Kg 44.000 Rp 1,400.00 Rp 61,600.00
Pasir Pasang M3 0.070 Rp 149,000.00 Rp 10,430.00
Pasir Beton M3 0.060 Rp 181,000.00 Rp 10,860.00
Kerikil M3 0.070 Rp 275,000.00 Rp 19,250.00
Baja Tulangan Kg 1.600 Rp - Rp -
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 Rp 85,000.00 Rp 272,000.00
Tukang L.02 OH 1.150 Rp 100,000.00 Rp 115,000.00
Kepala Tukang L.03 OH 0.011 Rp 105,000.00 Rp 1,155.00
Mandor L.04 OH 0.016 Rp 95,000.00 Rp 1,520.00
JUMLAH TENAGA KERJA Rp 389,675.00
B BAHAN
Bata Merah Bh 70.000 Rp 605.00 Rp 42,350.00
Semen Portland Kg 77.000 Rp 1,400.00 Rp 107,800.00
Pasir Pasang M3 0.130 Rp 149,000.00 Rp 19,370.00
Pasir Beton M3 0.090 Rp 181,000.00 Rp 16,290.00
Kerikil M3 0.020 Rp 275,000.00 Rp 5,500.00
Baja Tulangan Kg 2.600 Rp - Rp -
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 Rp 85,000.00 Rp 5,100.00
Tukang L.02 OH 0.030 Rp 100,000.00 Rp 3,000.00
Kepala Tukang L.03 OH 0.003 Rp 105,000.00 Rp 315.00
Mandor L.04 OH 0.003 Rp 95,000.00 Rp 285.00
JUMLAH TENAGA KERJA Rp 8,700.00
B BAHAN
Pipa Tanah D.15 Bh 1.600 Rp - Rp -
Semen portland Kg 0.680 Rp 1,400.00 Rp 952.00
Pasir Pasang M3 0.013 Rp 149,000.00 Rp 1,937.00
Pasir Urug M3 0.011 Rp 144,000.00 Rp 1,584.00
1 Mandor OH Rp 95,000.00
2 Kepala tukang OH Rp 105,000.00
3 Tukang OH Rp 100,000.00
4 Pekerja OH Rp 85,000.00
5 OverHead % 15.00%
6 PPN (Pajak Pertambahan Nilai) % 10.00%
A BAHAN DASAR :
1 Tanah Urug M3 Rp 55,000.00
2 Tanah Urug Truk Rp 192,500.00
3 Tanah Urug Pilihan M3 Rp 79,000.00
4 Tanah Urug Pilihan Truk Rp 276,500.00
5 Pasir Urug M3 Rp 144,000.00
6 Pasir Urug Kg Rp 102.86
7 Pasir Urug Truk Rp 504,000.00
8 Pasir pasang M3 Rp 149,000.00
9 Pasir pasang Kg Rp 106.43
10 Pasir pasang Truk Rp 521,500.00
11 Pasir beton M3 Rp 181,000.00
12 Pasir beton Kg Rp 129.29
13 Pasir beton Truk Rp 633,500.00
14 Batu belah gunung M3 Rp 175,000.00
15 Batu belah gunung Truk Rp 612,500.00
16 Batu Pecah M3 Rp 350,000.00
17 Batu Pecah Truk Rp 1,225,000.00
18 Batu Bata Merah M3 Rp 605,000.00
19 Batu Bata Merah Bh Rp 605.00
20 Batu Traso M3 Rp -
21 Batu Traso Bh Rp -
22 Batako M3 Rp 700,000.00
23 Batako Bh Rp 1,400.00
24 Terawang /loster beton M3 Rp -
25 Terawang /loster beton Bh Rp 31,500.00
26 Berongga /loster beton M3 Rp -
27 Berongga /loster beton Bh Rp 33,000.00
28 Bata Ringan T.7cm M3 Rp 540,000.00
29 Bata Ringan T.7cm Bh Rp -
30 Bata Ringan T.10cm M3 Rp 540,000.00
31 Bata Ringan T.10cm Bh Rp -
32 Bata Ringan T.12cm M3 Rp 540,000.00
33 Bata Ringan T.12cm Bh Rp -
34 Koral beton/Split 2 - 3 cm M3 Rp 432,300.00
35 Koral beton/Split 5 - 7 cm M3 Rp 375,100.00
36 Kerikil sungai M3 Rp 275,000.00
37 Kerikil sungai Kg Rp 203.70
38 Kerikil sungai Truk Rp 962,500.00
39 Sirtu M3 Rp 172,000.00
40 Sirtu Truk Rp 602,000.00
41 Sirtu M3 Rp 172,000.00
HARGA BAHAN MATERIAL BANGUNAN & HARGA UPAH KERJA
1 2 3
1 Aspal
- Asphalt Emulsi
- Asphalt Cair
- Asphalt Cair
- Asphalt Emulsi
2 Semen
- Semen
- Portland Cement
- Portland Cement 50 Kg
- Semen Warna (Nak untuk tegel)
- Semen Warna
3 Kaca
- Pemantul Cahaya (Reflector)
- Glass Block
- Kaca Rasa (Cermin) Lembar
- Ryben Polos 2 x 1
- Ryben 2 x 90
- Ryben 122 x 152
- Kaca Polos 2 x 1
- Kaca Polos 2 x 90
- Kaca Polos 122 x 152
4 Pasir
- Pasir Untuk Trotoar
- Pasir Pasang/Beton
- Pasir Urug
- Pasir Beton (Kasar)
- Pasir Halus (untuk HRS)
- Split/koral
- 5+E380
- Batu Kali
- Batu Gunung Lokal
- Batu Pecah 1-2 cm
- Batu Pecah 2-3 cm
- Batu Belah / Kerakal
5 Cat
- Cat Kilap
- Cat Anti Karat avian
- Cat Kilap propan
- Cat Manie yoko
- Minyak Cat
- AC Marine Use(Anti Cerosif M.U)
- AF marine use (AntiFouling M.U)
- Cat besi
- Cat Tembok
- Avitex 20
- Vinilex Nippon Paint
- Metrolight
- Cat Kayu
- Glotex
- Avian
- Platone
- Politur
- Cat Minyak
- Cat Meni Kayu
- Cat Atap Seng (Merk Yoko)
- Cat Vernis
- Cat Anti Karat
- Epoxy
- Anti Gores
6 Seng
- Seng Datar BJL.S 0.3
- Seng Bubungan BJLS 20"
- Seng Gelombang Kecil
7 Baja
Lempengan Besi Baja Profil design Galvanis
-
(Beam)
- Plat Baja
- Plat Baja Landasan Gurde Roller MB
- Plat Baja Penghubung MB Ke Dudukan MB
- Plat Baja T = 8 mm
- Plat baja T = 12 mm
- Profil Baja dan Plat Penutup Trench angkar
- Profil Baja Siku 100 x 100 x10
- Profil Baja WF 100.50.5.7
- Profil Baja WF 200.100.8.12
- Profil Baja WF 450.250.9.12
- Profil dan Plat Baja Penutup Cable Trench
- Tiang Baja D=457,2 mm T=12mm
- Baja Tulangan U24 Polos
- Baja Tulangan U32 Polos
- Baja Tulangan U32 Ulir
- Baja Tulangan U39 Ulir
- Baja Tulangan U48 Ulir
- Baja Tulangan Sirip BjTS 420 A
- Baja Bergelombang
8 Besi Beton
- Bollard/Bolder Kapasitas 15 Ton
- Bollard/Bolder Kapasitas 35 Ton
- Bollard/Bolder Kapasitas 30 Ton
- Bollard/Bolder Kapasitas 25 Ton
- Tiang Rambu dan jangkar 10/10 cm
- Besi Beton gp 12 SNI
- Bollard/Bolder Kapasitas 70 Ton
9 Tegel
- Tegel Keramik KIA Putih ukuran 30 x 30 cm
- Tegel Keramik Akura Putih ukuran 30 x 30 cm
- Tegel Keramik KIA ukuran 40 x 40 cm
- Tegel Keramik Paltinum Uk. 40 x 40 cm
- Tegel Keramik Anti Slip ukuran 20 x 20 cm
- Tegel Dinding Keramik ukuran 20 x 25 cm
- Tegel Keramik Motif Penyandang Cacat
- Tegel Keramik 30x30 cm (Brico Teracota)
- Tegel Granit 60 x 60 cm
- Tegel Granit 80 x 80 cm
- Tegel Granit 100 x 100 cm
- Tegel Granit 120 x 120 cm
- Batu Alam Suka Bumi
- Batu Alam Lahundape
- Batu granit
- Tegel Kuku/Sudut
- Tempat Sabun Keramik
10 Genteng
- Genteng Kodok
- Genteng Metal
- Genteng plentong " S "
11 Plat
- Plat Strip Uk. 4x30 mm
- Plat Beugel tebal 5 mm
12 Kawat Bronjong
- Kawat Bronjong
- Kawat Bronjong Pabrikasi dia 2,6 - 2,8 cm
- Kawat Bronjong Pabrikasi dia 2,6 - 3,2 cm
13 Bahan Bangunan Dan Konstruksi Lainnya
- Angkur
- Angkur Besi Siku Uk. 30x30x3 mm
- Angkur Besi Siku Uk. 50x50x4 mm
- Besi Angkur 30x30x3 mm
- Lem Mixed Epoxy Adhesive
- Angkur Diameter 25 mm
- Angkur Dudukan Engsel MB
- Angkur Dudukan tiang Listrik
- Angkur Plat Landasan Catwalk
- Angkur Potal baja Penggantung Hidrolik
- Engsel Pintu dan Jendela 4"
- Lem Kayu
- Multiplex 18 mm
- Rangka Plat rambu 3/8 cm
- Rantai Penahan
- Ring Untuk Sepatu Tiang pancang
- Sirap Ulin
- Sloof kayu Ulin d. 10-6 m
- Tarikan Jendela
- Fender Karet type V.250 - 1000 L
- Fender Karet type V.250 - 1500 L
- Fender Karet type V.250 - 2000 L
- Fender Karet type V.500 H - 1500 L
- Fibre Mesh
- Urugan Tanah Pilihan
- Urugan Tanah Biasa
- Bahan Tanah Timbunan
- Bahan Pilihan
- Kerikil
- Sirtu Gunung
- Sirtu Kali
- Chipping
- Chipping (kg)
- Gravel
- Kapur
- Tanah Liat
- Cansteen ( Ukuran 20 cm x 60 cm )
- Cansteen ( Ukuran 30 cm x 60 cm )
F i l l e r (non semen) (limestone dust, kapur
-
padam, dolomit, fly ash)
- Bahan Anti Pengelupasan
- Agrerat Pengunci ( Clipping )
- Minyak Fluks
- Cat Marka (Non Thermoplas)
- Cat Marka (Thermoplastic)
- Glass Bead
- Agregat Kasar
- Agregat Halus
- Agregat Lolos # 1 "
- Agr. Kelas A (analisis)
- Agr. Kelas B (analisis)
- Arg. Kelas S (analisis)
- Lapis Drainase (analisis)
- Plastik Filter
- Lolos screen1 ukuran ( 0 - 5)
- Lolos screen2 ukuran ( 0 - 5)
- Lolos screen2 ukuran ( 5 - 9,5)
- Lolos screen2 ukuran ( 9.5 - 19,0)
- Gebalan Rumput
- Air Bersih
- Glass Bead
- Arbocell
- Paving Block K300 t= 6 Cm Natural
- Paving Block K300 t= 6 Cm Warna
- Paving Block K250 t= 6 Cm
- Paving Block K250 t= 6 Cm Warna
- Paving Block K300 t= 8 Cm
- Paving Block K300 t= 8 Cm Warna
- Paving Block K250 t= 8 Cm
- Paving Block K250 t= 8 Cm Warna
- Topi Uskup (Pengancing Paving Block) K300
- Topi Uskup (Pengancing Paving Block) K250
- Kerb Beton (Uk. 30x60Cm)
- Kerb Beton (Uk. 20x60Cm)
- Bollar Tiang Penghalang Trotoar
- Bollar Bola dia 50 cm
- Bollar Bola Beton dia 40 cm
- Bollar Bola Beton dia 30 cm
- Bollar Bola Beton dia 25 cm
- Kursi Taman Besi Tuang
- Dril Penutup Saluran Besi Tuang uk. 80 x 80 cm
- Drain Saluran Peresapan air 40 x 60 cm
- Beton U.Ditch Tipe 60 cm K.300
- Beton U.Ditch Tipe 80 cm K.300
- Beton K -125
- Beton K -175
- Beton K -200
- Beton K -225
- Beton K -250
- Beton K -300
- Beton K -350
- Beton K -400
- Beton K -500
- Bahan Agr.Base Kelas A
- Bahan Agr.Base Kelas B
- Bahan Agr.Base Kelas C
- PC Spun Pile, K--600, D400, Kelas A2, Bottom
- PC Spun Pile, K--600, D400, Kelas A2, Middle
- PC Spun Pile, K--600, D400, Kelas B0, Bottom
- PC Spun Pile, K--600, D400, Kelas B0, Middle
- PC Spun Pile, K--600, D400, Kelas C0, Bottom
- PC Spun Pile, K--600, D400, Kelas C0, Middle
- PC Spun Pile, K--600, D450, Kelas A1, Bottom
- PC Spun Pile, K--600, D450, Kelas A1, Middle
- PC Spun Pile, K--600, D450, Kelas B0, Bottom
- PC Spun Pile, K--600, D450, Kelas B0, Middle
- PC Spun Pile, K--600, D450, Kelas C0, Bottom
- PC Spun Pile, K--600, D450, Kelas C0, Middle
- PC Spun Pile, K--600, D500, Kelas A1, Bottom
- PC Spun Pile, K--600, D500, Kelas A1, Middle
- PC Spun Pile, K--600, D500, Kelas B0, Bottom
- PC Spun Pile, K--600, D500, Kelas B0, Middle
- PC Spun Pile, K--600, D500, Kelas C0, Bottom
- PC Spun Pile, K--600, D500, Kelas C0, Middle
- PC I Girder, Fc.40Mpa, H-210, CTC 1.85
- PC I Girder, Fc.50Mpa, H-210, CTC 1.85
- PC I Girder, Fc.60Mpa, H-210, CTC 1.40
- PC I Girder, Fc.70Mpa, H-210, CTC 1.40
- Diafragma PC I, H-210, CTC 1.85
- Diafragma PC I, H-210, CTC 1.40
- Plat Deck PC I, H-210, CTC 1.85
- Plat Deck PC I, H-210, CTC 1.40
- Elastomer Bearing Pad PC I H-210 (40x60x5 cm)
- PC I Girder, Fc.40Mpa, H-170, CTC 1.85
- PC I Girder, Fc.50Mpa, H-170, CTC 1.85
- PC I Girder, Fc.60Mpa, H-170, CTC 1.40
- Diafragma PC I, H-170, CTC 1.85
- Diafragma PC I, H-170, CTC 1.40
- Plat Deck PC I, H-170, CTC 1.85
- Plat Deck PC I, H-170, CTC 1.40
- Elastomer Bearing Pad PC I H-170 (40x50x5 cm)
U-Ditch, K-350, tebal 7cm, L 60cm, T 60cm
-
Panjang 1,2 m
U-Ditch, K-350, tebal 7cm, L 60cm, T 80cm
-
Panjang 1,2 m
U-Ditch, K-350, tebal 7cm, L 80cm, T 80cm
-
Panjang 1,2 m
U-Ditch, K-350, tebal 9cm, L 1 m, T 1 m, Panjang
-
1,2 m
U-Ditch, K-350, tebal 9cm, L 1 m, T 1.2 m,
-
Panjang 1,2 m
Cover U-Ditch, K-350, tebal 10cm, L 60cm,
-
Panjang 60cm
Cover U-Ditch, K-350, tebal 10cm, L 80cm,
-
Panjang 60cm
Cover U-Ditch, K-350, tebal 10cm, L 1 m,
-
Panjang 60cm
- Batako Ukuran 20 x 40 x 10
- Batu Bata
- Bata Ringan 60 x 20 x 7,5 ; 10 cm
- Beton Roster / Kerawang
- Asbes 3 mm, Ukuran 100 x 100
- Tripleks Tebal 3 mm
- Tripleks (ukuran 1,22 x 2,44 M) :
- - tebal 3 mm
- - tebal 6 mm
- - tebal 9 mm
- - tebal 12 mm
- Teakwood
- List Plafond Kayu Kelas II
- Multipleks 4 mm
- Multiplek 6 mm
- Multiplek 9 mm
- Multiplek 12 mm
- Thener super
- Thener dasar
- Eternit 3 mm
- Gipsumboard 240 x 120 x 0,4 cm
- Kalsiboard
- Kayu Lapis 4 mm Ukuran 8 " x 4 "
- Kayu Lapis 12 mm Ukuran 8 " x 4 "
- Lapisan Bahan Taco HPL
- Asbes Gelombang
- Atap Sirap
- Alimunium
- Nok Bumbongan Genteng Kodok
- Nok Bubungan Asbes
- Nok Bubungan Genteng Metel
- Bumbungan Genteng plenttong " S "
- Atap Sakura Roof
- Nok Sakura Roof
- Karet Talang Air
- Talang Air Fiber
- Lem Seng Atap Multi Roof
- Lem Seng Nok Multi Roof
- Genteng Atap Zincalume
- Nok Genteng Metal
- Nok C Rad : 9-9.5 P: 40 CM
- Nok Putri P: 109 Cm Ef: 80 Cm
- Nok Ratu P: 91 Cm Ef: 80 Cm
- Nok Raja P: 104 Cm Ef: 80 Cm
- Nok U P: 110 Cm
- Nok Samping P : 110 Cm
- Nok Zincalume
- Besi Struktur
- Kawat beton
Angker/Baut/Plat Pengikat untuk Kuda-Kuda /
-
Konsol
- Paku Campur
- Paku Seng
- Paku Biasa
- Paku Biasa 1 cm - 3 cm
- Paku Anti Karat
- Paku Tripleks / Plafond
- Paku Gipsunbord
- Paku Kalsiboar
- Pagar BRC Jadi ( Tinggi 1M )
- Besi Profil C a Pipa Besi Dia. 2 "
- Top/Bottom Chord 0.8 mm
- Web 0.75 mm
- Profil Reng 0.60 mm
- Screw Truss/Reng
- Dynabold
- Dynabold
Besi Hollow Galvalume 0,2cm x 0,4cm Tebal 1,1
-
mm
Besi Hollow Galvalume 0,2cm x 0,4cm Tebal 1,2
-
mm
Besi Hollow Galvalume 0,4cm x 0,4cm Tebal 1,1
-
mm
Besi Hollow Galvalume 0,2cm x 0,4cm Tebal 1,2
-
mm
Besi Hollow Galvalume 0,4cm x 0,6cm Tebal 1,2
-
mm
Besi Hollow Galvalume 0,4cm x 0,8cm Tebal 1,3
-
mm
- Kawat Las NIKKO
- Kawat Las
- Kawat Las/Electrode
- Oxygen
- Engsel Bubut
- Profil M Aluminium
- Skrup Fixer
- Sealant
- Galvalume HI100 CI 75.75
- Paku Skrup
- Baja Profil Siku
- Baja Profil UNP
- Besi Beton
- Besi Pengaku
- Kawat Las Listrik
- Elastomer Jenis 1
- Elastomer Jenis 2
- Elastomer Jenis 3
- Espansion Joint Baja Siku
- Geotextile Non Woven
- Geotextile Woven
- Tiang Pancang Baja
- Tiang Pancang Beton Pratekan
- Tiang Pancang Kayu Besi Æ15 - 20 Cm
- Kawat Las
- Pipa Baja
- Plamur Tembok
- Plamir Kayu
- Meni Besi
- Politur
- Dempul Kayu
- Kuas Biasa 3 cm
- Kuas Roll
- Amplas Kasar
- Amplas Halus
- Thinner
- Tanah Timbunan
14 Kawat
- Kawat Sling Besi
- Kawat Licin 1,5mm Besi/BK 1,5mm
- Kawat baja/Bindrrad
- Kawat Last Electrode
Pemeliharaan
- Kawat Las
Tenda Pengungsi
15 Kayu
- Gapit Kayu Ulin D. 10-6 M
- List Profil
- Papan Kayu Meranti
- Papan Kayu ulin
- Papan Kayu 4 x 20 cm Kayu Damar )
- Papan Lanan ( Untuk Cor )
- Tiang Kayu ulin 20/20 Panjang 15 m (Induk)
- Tiang Kayu ulin 20/20 Panjang 15 m (Gapit)
- Tiang Kayu Besi 20/20 Panjang 10 m (Induk)
- Tiang Kayu Besi 20/20 Panjang 12 m (Gapit)
- Tiang Kayu ulin 20/20 Panjang 5 m
- Tiang Kayu ulin 15/15 Panjang 10 m
- Tiang Kayu Kamper 15/15 Panjang 8 m (Gapit)
- Tiang Kayu Kamper 15/15 Panjang 6 m (Induk)
- Batang Kelapa
- Kayu Balok Klas I
- Kayu Balok Klas II
- Kayu Balok Klas III
- Kayu Balok Bekesting Klas IV
- Kayu Balok Kalapi untuk Kusen
Kayu Balok 7/15 Silae/Bisulo/Bitti (Klas II) untuk
-
kuda-kuda
Kayu Usuk atau Kaso Kelas II (Kamper
-
Medan/B.Super)
- Kayu Usuk atau Kaso Kelas III (Albasia)
- Papan Kayu Kelas I
- Papan Kayu Kelas II
- Papan Kayu Kelas III
- Papan Kayu Kelas IV untuk papan begisting/mall
- Balok Kayu Biti
- Kayu Besi Dia 20 cm
- Kayu Besi Dia 30 cm
- Kayu Dolken Diameter 8-10 cm
- Kayu Perancah
16 Bahan Baku Lainnya
- Behel Kabel Sling Besi U Lengk
- Hak Angin
- Pembuatan Fendeer (Fabrication)
- Ter
- Densopole
- Densopaste
- Densotape
- Kawat baja/Bindraad
- Kantong Sampah
- Sarung Tangan Latex
17 Isi Tabung Gas Oksigen
- Pengisian Tabung gas oksigen besar
- Pengisian Tabung gas oksigen kecil
- Pengisian Tabung Pemadam Kebakaran
18 Isi Tabung Gas Elpiji
- Pengisian Tabung Gas 50 Kg
- Pengisian Tabung Gas 5 Kg
- Pengisian Tabung Gas 12 Kg
- Pengisian Tabung Gas 3 Kg
19 Pipa Baja Lainnya
- Baut Mur Baja 8 x 15 mm
- Pipa baja
- Baut Mur Baja 8 x 35 mm
- Baut Mur Baja 8 x 40 mm
- Baut Mur Baja 8 x 45 mm
- Baut Mur Baja 8 x 50 mm
- Baut Mur Baja 8 x 30 mm
- Baut Mur Baja 8 x 25 mm
- Baut Mur Baja 8 x 20 mm
20 Pipa Beton Pratekan Lainnya
- Buis Beton dia 20 cm
21 Pipa Plastik PVC
- Pipa Pengaman PVC
- Pipa GSP D=2,5" T=3 mm
- Pipa Paralon diameter 2"
- Pipa PVC 1/2 " SNI (MOF) (S-12,5)
- Pipa PVC 3/4 " SNI (MOF)
- Pipa PVC 1 " SNI (MOF)
- Pipa PVC 1,5 " SNI (MOF)
- Pipa PVC 2 " SNI (MOF)
- Pipa PVC 2,5 " SNI (MOF)
- Pipa PVC 3" SNI (MOF)
- Pipa PVC 4" SNI (MOF)
- Pipa PVC 6" SNI (MOF)
- Pipa PVC 8" SNI (MOF)
- Pipa PVC 10" SNI (MOF)
- Pipa PVC 12" SNI (MOF)
- Pipa PVC 1/2 " SNI (RR) (S-12.5)
- Pipa PVC 3/4 " SNI ( RR )
- Pipa PVC 1 " SNI (RR)
- Pipa PVC 1,5 " SNI (RR)
- Pipa PVC 2 " SNI ( RR )
- Pipa PVC 2,5 " SNI ( RR )
- Pipa PVC 3 " SNI ( RR )
- Pipa PVC 4" SNI ( RR )
- Pipa PVC 6 " SNI ( RR )
- Pipa PVC 8 " SNI ( RR )
- Pipa PVC 10 " SNI ( RR )
- Pipa PVC 12 " SNI ( RR )
- Pipa PVC 1/2 " SNI ( MOF ) (S-12.5)
- Pipa PVC 3/4 " SNI ( MOF )
- Pipa PVC 1 " SNI ( MOF )
- Pipa PVC 1,5 " SNI ( MOF )
- Pipa PVC 2 " SNI ( MOF )
- Pipa PVC 2,5 " SNI ( MOF )
- Pipa PVC 3 " SNI ( MOF )
- Pipa PVC 4 " SNI ( MOF )
- Pipa PVC 6 " SNI ( MOF )
- Pipa PVC 8 " SNI ( MOF )
- Pipa PVC 10 " SNI ( MOF )
- Pipa PVC 12 " SNI ( MOF )
- Pipa PVC 1/2 " SNI ( RR ) (S-12.5)
- Pipa PVC 3/4 " SNI ( RR )
- Pipa PVC 1 " SNI ( RR )
- Pipa PVC 1,5 " SNI ( RR )
- Pipa PVC 2 " SNI ( RR )
- Pipa PVC 2,5 " SNI ( RR )
- Pipa PVC 3 " SNI ( RR )
- Pipa PVC 4 " SNI ( RR )
- Pipa PVC 6 " SNI ( RR )
- Pipa PVC 8 " SNI ( RR )
- Pipa PVC 10 " SNI ( RR )
- Pipa PVC Dia 1,5"
22 Pipa Plastik PVC (UPVC) Lainnya
- Tee PVC 3/4" X 1/2 " ( RR )
- Tee PVC 10'' X 8" (RR)
- Tee PVC 8'' X 6" (RR)
- Tee PVC 8" X 4" (RR)
- Tee PVC 6" X 4" (RR)
- Tee PVC 6" x 3" (RR)
- Tee PVC 3" X 2" (RR)
- Tee PVC 2" x 1 "(RR)
- Tee PVC 2" X 3/4"(RR)
- Tee PVC 1,5 X 1 3/4 " (RR)
- Tee PVC 1,5 X 1" (RR)
- Tee PVC 1,5 " X 3/4 " (RR)
- Tee PVC 1" X 3/4 "( RR )
- Tee PVC 1"X1/2 "( RR)
- Tee PVC Dia 10 "RR
- Tee PVC Dia 8 "RR
- Tee PVC Dia 6 "RR
- Tee PVC Dia 4 "RR
- Tee PVC Dia 3 "RR
- Tee PVC Dia 2,5 "RR
- Tee PVC Dia 2 "RR
- Tee PVC Dia 1,5 "RR
- Tee PVC Dia 1"RR
- Tee PVC Dia 3/4 "RR
- Tee PVC Dia 1/2 "RR
- Tee PVC Dia 8 "
- Tee PVC Dia 6 "
- Tee PVC Dia 4 "
- Tee PVC Dia 3 "
- Tee PVC Dia 2,5 "
- Tee PVC Dia 2 "
- Tee PVC Dia 1,5 "
- Tee PVC Dia 1 "
- Tee PVC Dia 3/4 "
- Tee PVC Dia 1/2 "
23 Pipa Lainnya
- Pipa Besi Hitam
- Tutup Pipa diameter 1,5"
- Tutup Pipa diameter 2"
- Pipa Galvanis 1/2"
- Pipa Galvanis 1/2"
- Pipa Galvanis 3/4"
- Pipa Galvanis 1"
- Pipa Galvanis 1"
- Pipa Galvanis 1,5"
- Pipa Galvanis 1,5"
- Pipa Galvanis 2"
- Pipa Galvanis 2"
- Pipa Galvanis 2,5"
- Pipa Galvanis 3"
- Pipa Galvanis 4"
- Pipa Galvanis 6"
- Pipa Galvanis 8" (4,9)
- Pipa Galvanis 1/2"
- Pipa Galvanis 3/4"
- Pipa Galvanis 1"
- Pipa Galvanis 1,5"
- Pipa Galvanis 12"
- Pipa Galvanis 2,5"
- Pipa Galvanis 3"
- Pipa Galvanis 4"
- Pipa Galvanis 6"
- Pipa Galvanis 8" (4,9)
- Clamp Saddie 2 x 1/2"
- Clamp Saddie 2 x 3/4"
- Clamp Saddie 3 x 1/2"
- Clamp Saddie 3 x 3/4"
- Clamp Saddie 3 x 1"
- Clamp Saddie 4 x 1/2"
- Clamp Saddie 4 x 3/4"
- Clamp Saddie 4 x 1"
- Clamp Saddie 6 x 1/2"
- Clamp Saddie 6 x 3/4"
- Clamp Saddie 6 x 1"
- Clamp Saddie 6 x 2"
- Clamp Saddie 8 x 1/2"
- Clamp Saddie 8 x 3/4"
- Clamp Saddie 8 x 1"
- Clamp Saddie 8 x 2"
- Clamp Saddle 10 x 1/2"
- Clamp Saddle 12 x 1/2"
- Tea All Flange GI Dia 3" x 3"
- Tea All Flange GI Dia 4" x 3"
- Tea All Flange GI Dia 4" x 4"
- Tea All Flange GI Dia 6" x 3"
- Tea All Flange GI Dia 6" x 4"
- Tea All Flange GI Dia 6" x 6"
- Tea All Flange GI Dia 8" x 3"
- Tea All Flange GI Dia 8" x 4"
- Tea All Flange GI Dia 8" x 6"
- Tea All Flange GI Dia 8" x 8"
- Tea All Flange GI Dia 10" x 6"
- Tea All Flange GI Dia 10" x 8"
- Tea All Flange GI Dia 10" x 10"
- Tea All Flange GI Dia 12" x 8"
- Tea All Flange GI Dia 12" x 10"
- Tea All Flange GI Dia 12" x 12"
- Tea All Flange GI Dia 14" x 6"
- Tea All Flange GI Dia 14" x 8"
- Tea All Flange GI Dia 14" x 10"
- Tea All Flange GI Dia 20" x 10"
- Bend PVC Dia 2" x 900 (RR)
- Bend PVC Dia 3" x 900
- Bend PVC Dia 4" x 900
- Bend PVC Dia 6" x 900
- Bend PVC Dia 8" x 900
- Bend PVC Dia 10" x 900
- Bend PVC Dia 12" x 900
- Bend PVC Dia 2" x 450
- Bend PVC Dia 3" x 450
- Bend PVC Dia 4" x 450
- Bend PVC Dia 6" x 450
- Bend PVC Dia 8" x 450
- Bend PVC Dia 10" x 450
- Bend PVC Dia 12" x 450
- Bend PVC Dia 2" x 22,50
- Bend PVC Dia 3" x 22,50
- Bend PVC Dia 4" x 22,50
- Bend PVC Dia 6" x 22,50
- Bend PVC Dia 8" x 22,50
- Bend PVC Dia 10" x 22,50
- Bend PVC Dia 12" x 22,50
- Gate Valve 1,5" (RR)
- Gate Valve 2"
- Gate Valve 2,5"
- Gate Valve 3"
- Gate Valve 4"
- Gate Valve 6"
- Gate Valve 8"
- Gate Valve 10"
- Valve Socket Dia 20 mm x 1/2" ( RR )
- Valve Socket Dia 25 mm x 3/4"
- Valve Socket Dia 32 mm x 1
- Valve Socket Dia 40 mm x 1 1/4"
- Valve Socket Dia 50 mm x 1 1/2"
- Valve Socket Dia 63 mm x 2"
- Valve Socket Dia 90 mm x 3"
- Valve Socket Dia 110 mm x 4"
- Faucet Socket Dia 20 mm x 1/2" ( RR )
- Faucet Socket Dia 25 mm x 3/4"
- Faucet Socket Dia 32 mm x 1"
- Faucet Socket Dia 40 mm x 1 1/4"
- Cap/Dop PVC Dia 2"
- Cap/Dop PVC Dia 3"
- Cap/Dop PVC Dia 4"
- Cap/Dop PVC Dia 6"
- Cap/Dop PVC Dia 8"
- Cap/Dop PVC Dia 10"
- Elbow Dia 1/2"
- Elbow Dia 3/4"
- Reducer Socket 1" x 1/2"
- Reducer Socket 1" x 3/4"
- Reducer Socket 1 1/2" x 3/4"
- Reducer Socket 2" x 1"
- Reducer Socket 2" x 1 1//2"
- Reducer Socket 3" x 1 1/2"
- Reducer Socket 4" x 2"
- Reducer Socket 4" x 3"
- Reducer Socket 6" x 3"
- Reducer Socket 8" x 4"
- Reducer Socket 10" x 8"
- Reducer Socket 12" x 6"
- Reducer Socket 12" x 10"
- Reducer Tee PVC Dia 6" x 4"
- Reducer Tee PVC Dia 4" x 3"
- Reducer Tee PVC Dia 4" x 2"
- Reducer Tee PVC Dia 3" x 2"
- Reducer PVC Dia 4" x 3"
- Reducer PVC Dia 6" x 3"
- Reducer PVC Dia 6" x 4"
- Reducer PVC Dia 8" x 4"
- Reducer PVC Dia 8" x 6"
- Reducer PVC Dia 10" x 6"
- Reducer PVC Dia 10" x 8"
- Reducer PVC Dia 12" x 8"
- Reducer PVC Dia 12" x 10"
- Flange GI Dia 6 "
- Flange GI Dia 8 "
- Flange GI Dia 10 "
- Flange GI Dia 12 "
- Flange GI Dia 14 "
- Flange GI Dia 16 "
- Flange GI Dia 20 "
- Flange Spigot 2" (RR)
- Flange Spigot 3"
- Flange Spigot 4"
- Flange Spigot 6"
- Flange Spigot 8"
- Flange Spigot 10"
- Flange Spigot 12"
- Flange Joint HDPE 1 1/2"
- Flange Joint HDPE 2"
- Flange Joint HDPE 2 1/2"
- Flange Joint HDPE 3"
- Flange Joint HDPE 4"
- Air Valve Dia 2"
- Air Valve Dia 3"
- Dreser Joint Dia 2"
- Dreser Joint Dia 3"
- Dreser Joint Dia 4"
- Dreser Joint Dia 6"
- Dreser Joint Dia 8"
- Dreser Joint Dia 10"
- Dreser Joint Dia 12"
- Dreser Joint Dia 14"
- Dreser Joint Dia 14"
- Dreser Joint Dia 14"
- Dreser Joint Dia 20"
- Gible Joint 2 "
- Gible Joint 3 "
- Gible Joint 4 "
- Gible Joint 6 "
- Gible Joint 8 "
- Gible Joint 10 "
- Lockable valve
- Seal Tipe/Isolasi Pipa
- Multiplek 4 mm
Pasangan baik air 0,40 M3 (ditegel 10x 20)
-
sumbat bak
- Pipa HDPE 1/2"
- Pipa HDPE 3/4"
- Pipa HDPE 1"
- Pipa HDPE 1,5"
- Pipa HDPE 2"
- Pipa HDPE 2,5"
- Pipa HDPE 3"
- Pipa HDPE 4"
- Pipa HDPE 6"
- Pipa HDPE 8"
- Pipa HDPE 10"
- Pipa HDPE 12"
- Pipa HDPE 1/2 " (PE 100 SDR 17 PN 10 Bar)
- Pipa HDPE 3/4 "
- Pipa HDPE 1 "
- Pipa HDPE 1 1/2 "
- Pipa HDPE 2 "
- Pipa HDPE 2 1/2 "
- Pipa HDPE 3 "
- Pipa HDPE 4 "
- Pipa HDPE 6 "
- Pipa HDPE 8 "
- Pipa HDPE 10 "
- Pipa HDPE 12 "
- Pipa HDPE 14 "
- Pipa HDPE 16 "
- Pipa HDPE 18 "
- Pipa HDPE 20 "
- Pipa HDPE 22 "
- Pipa HDPE 24 "
- Pipa HDPE 16 "
- Pipa HDPE 18 "
- Pipa HDPE 20 "
- Pipa HDPE 22 "
- Pipa HDPE 24 "
- Pipa HDPE 28 "
- Pipa HDPE 32 "
- Pipa HDPE 36 "
- Pipa HDPE 40 "
- Pipa HDPE 48 "
- Pipa HDPE 1/2 " (PE 100 SDR 21 PN 8 Bar)
- Pipa HDPE 3/4"
- Pipa HDPE 1 "
- Pipa HDPE 1 1/4 "
- Pipa HDPE 1 1/2 "
- Pipa HDPE 2 "
- Pipa HDPE 2 1/2 "
- Pipa HDPE 3 "
- Pipa HDPE 4 "
- Pipa HDPE 5 "
- Pipa HDPE 5 1/2 "
- Pipa HDPE 6 "
- Pipa HDPE 7 "
- Pipa HDPE 8 "
- Pipa HDPE 9 "
- Pipa HDPE 10 "
- Pipa HDPE 11 "
- Pipa HDPE 12 "
- Pipa HDPE 14 "
- Pipa HDPE 16 "
- Pipa HDPE 18 "
- Pipa HDPE 20 "
- Pipa HDPE 22 "
- Pipa HDPE 24 "
- Pipa HDPE 28 "
- Pipa HDPE 32 "
- Pipa HDPE 36 "
- Pipa HDPE 40 "
- Pipa HDPE 48 "
- Elbow HDPE 45 (PN 10) 1,5"
- Elbow HDPE 45 (PN 10) 2"
- Elbow HDPE 45 (PN 10) 2,5"
- Elbow HDPE 45 (PN 10) 3"
- Elbow HDPE 45 (PN 10) 4"
- Elbow HDPE 45 (PN 10) 6"
- Elbow HDPE 45 (PN 10) 8"
- Elbow HDPE 45 (PN 10) 10"
- Elbow HDPE 45 (PN 10) 12"
- Elbow 90 HDPE (PN 10) 1,5"
- Elbow 90 HDPE (PN 10) 2"
- Elbow 90 HDPE (PN 10) 2,5"
- Elbow 90 HDPE (PN 10) 3"
- Elbow 90 HDPE (PN 10) 4"
- Elbow 90 HDPE (PN 10) 6"
- Elbow 90 HDPE (PN 10) 8"
- Elbow 90 HDPE (PN 10) 10"
- Elbow 90 HDPE (PN 10) 12"
- Tee Equal HDPE ( PN 10 ) 1.5"
- Tee Equal HDPE ( PN 10 ) 2"
- Tee Equal HDPE ( PN 10 ) 2,5"
- Tee Equal HDPE ( PN 10 ) 3"
- Tee Equal HDPE ( PN 10 ) 4"
- Tee Equal HDPE ( PN 10 ) 6"
- Tee Equal HDPE ( PN 10 ) 8"
- Tee Equal HDPE ( PN 10 ) 10"
- Tee Equal HDPE ( PN 10 ) 12"
- End CUP HDPE 1/2"
- End CUP HDPE 3/4"
- End CUP HDPE 1"
- End CUP HDPE 1,5"
- End CUP HDPE 2"
- End CUP HDPE 2,5"
- End CUP HDPE 3"
- End CUP HDPE 4"
- Endcap HDPE 1,5"
- Endcap HDPE 2"
- Endcap HDPE 2,5"
- Endcap HDPE 3"
- Endcap HDPE 4"
- Endcap HDPE 6"
- Endcap HDPE 8"
- Endcap HDPE 10"
- Endcap HDPE 12"
- Endcap HDPE 14"
- Endcap HDPE 16"
- Endcap HDPE 18"
- Endcap HDPE 20"
- Endcap HDPE 22"
- Endcap HDPE 24"
- Endcap HDPE 28"
- Endcap HDPE 32"
- Clamp Sadle HDPE 1" x 3/4"
- Clamp Sadle HDPE 1" x 1"
- Clamp Sadle HDPE 1,5" x 3/4"
- Clamp Sadle HDPE 1,5" x 1"
- Clamp Sadle HDPE 2" x 3/4"
- Clamp Sadle HDPE 2" x 1"
- Clamp Sadle HDPE 2" x 1,5"
- Clamp Sadle HDPE 2,5" x 3/4"
- Clamp Sadle HDPE 2,5" x 1"
- Clamp Sadle HDPE 3" x 3/4"
- Clamp Sadle HDPE 3" x 1"
- Clamp Sadle HDPE 3" x 1 1/4"
- Clamp Sadle HDPE 3" x 2"
- Clamp Sadle HDPE 4" x 3/4"
- Clamp Sadle HDPE 4" x 1"
- Clamp Sadle HDPE 4" x 1 1/4"
- Clamp Sadle HDPE 4" x 2"
- Clamp Sadle HDPE 6" x 3/4"
- Clamp Sadle HDPE 6" x 1"
- Clamp Sadle HDPE 6" x 2"
- Clamp Sadle HDPE 8" x 2"
- Stub Flange c/w backing ring HDPE 1,5 "
- Stub Flange c/w backing ring HDPE 2 "
- Stub Flange c/w backing ring HDPE 2,5 "
- Stub Flange c/w backing ring HDPE 3 "
- Stub Flange c/w backing ring HDPE 4 "
- Stub Flange c/w backing ring HDPE 6 "
- Stub Flange c/w backing ring HDPE 8 "
- Stub Flange c/w backing ring HDPE 10 "
- Stub Flange c/w backing ring HDPE 12 "
- Endcap HDPE 1,5"
- Endcap HDPE 2"
- Endcap HDPE 2,5"
- Endcap HDPE 3"
- Endcap HDPE 4"
- Endcap HDPE 6"
- Endcap HDPE 8"
- Endcap HDPE 10"
- Endcap HDPE 12"
- Reducer HDPE 2" x 1,5"
- Reducer HDPE 2,5" x 1,5"
- Reducer HDPE 3" x 2"
- Reducer HDPE 3" x 2,5"
- Reducer HDPE 4" x 3"
- Reducer HDPE 4" x 2,5"
- Reducer HDPE 6" x 4"
- Reducer HDPE 6" x 3"
- Reducer HDPE 8" x 6"
- Reducer HDPE 10" x 8"
- Reducer HDPE 10" x 6"
- Reducer HDPE 12" x 10"
- Reducer HDPE 12" x 8"
- Elbow HDPE 45 (PN 10) 1,5"
- Elbow HDPE 45 (PN 10) 2"
- Elbow HDPE 45 (PN 10) 2,5"
- Elbow HDPE 45 (PN 10) 3"
- Elbow HDPE 45 (PN 10) 4"
- Elbow HDPE 45 (PN 10) 6"
- Elbow HDPE 45 (PN 10) 8"
- Elbow HDPE 45 (PN 10) 10"
- Elbow HDPE 45 (PN 10) 12"
- Equal Elbow HDPE Dia 20 x 20 mm
- Equal Elbow HDPE Dia 25 x 25 mm
- Equal Elbow HDPE Dia 32 x 32 mm
- Equal Elbow HDPE Dia 40 x 40 mm
- Equal Elbow HDPE Dia 50 x 50 mm
- Equal Elbow HDPE Dia 63 x 63 mm
- Equal Elbow HDPE Dia 75 x 75 mm
- Equal Elbow HDPE Dia 90 x 90 mm
- Equal Elbow HDPE Dia 110 x 110 mm
- Tee Unequal HDPE 3/4" x 1/2"
- Tee Unequal HDPE 1" x 1/2"
- Tee Unequal 1" x 3/4"
- Tee Unequal 1 1/4" x 1"
- Tee Unequal 1 1/2" x 1 "
- Tee Unequal 1 1/2" x 1 1/4"
- Tee Unequal 2" x 1 1/2"
- Coupler HDPE 1/2"
- Coupler HDPE 3/4"
- Coupler HDPE 1"
- Coupler HDPE 1 1/4"
- Coupler HDPE 1 1/2"
- Coupler HDPE 2"
- Coupler HDPE 2 1/2"
- Coupler HDPE 3"
- Couppler HDPE 4"
- Equal Tee HDPE Dia 20 x 20 mm
- Equal Tee HDPE Dia 25 x 25 mm
- Equal Tee HDPE Dia 32 x 32 mm
- Equal Tee HDPE Dia 40 x 40 mm
- Equal Tee HDPE Dia 50 x 50 mm
- Equal Tee HDPE Dia 63 x 63 mm
- Equal Tee HDPE Dia 75 x 75 mm
- Equal Tee HDPE Dia 90 x 90 mm
- Equal Tee HDPE Dia 110 x 110 mm
- Straight Coupler HDPE Dia 20 x 20 mm
- Straight Coupler HDPE Dia 25 x 25 mm
- Straight Coupler HDPE Dia 32 x 32 mm
- Straight Coupler HDPE Dia 40 x 40 mm
- Straight Coupler HDPE Dia 50 x 50 mm
- Straight Coupler HDPE Dia 63 x 63 mm
- Straight Coupler HDPE Dia 75 x 75 mm
- Straight Coupler HDPE Dia 90 x 90 mm
- Straight Coupler HDPE Dia 110 x 110 mm
- Reducing Coupler HDPE Dia 25 x 20 mm
- Reducing Coupler HDPE Dia 32 x 20 mm
- Reducing Coupler HDPE Dia 32 x 25 mm
- Reducing Coupler HDPE Dia 40 x 32 mm
- Reducing Coupler HDPE Dia 50 x 25 mm
- Reducing Coupler HDPE Dia 50 x 32 mm
- Reducing Coupler HDPE Dia 50 x 40 mm
- Reducing Coupler HDPE Dia 63 x 32 mm
- Reducing Coupler HDPE Dia 63 x 40 mm
- Reducing Coupler HDPE Dia 63 x 50 mm
- Reducing Coupler HDPE Dia 75 x 50 mm
- Reducing Coupler HDPE Dia 75 x 63 mm
- Reducing Coupler HDPE Dia 90 x 63 mm
- Reducing Coupler HDPE Dia 90 x 75 mm
- Reducing Coupler HDPE Dia 110 x 90 mm
- Male Thread Adaptor HDPE 20mm x 1/2"
- Male Thread Adaptor HDPE 20mm x 3/4"
- Male Thread Adaptor HDPE 25mm x 1/2"
- Male Thread Adaptor HDPE 25mm x 3/4"
- Male Thread Adaptor HDPE 25mm x 1"
- Male Thread Adaptor HDPE 32mm x 3/4"
- Male Thread Adaptor HDPE 32mm x 1"
- Male Thread Adaptor HDPE 40mm x 1 1/4"
- Male Thread Adaptor HDPE 50mm x 1 1/2"
- Male Thread Adaptor HDPE 63mm x 2"
- Male Thread Adaptor HDPE 75mm x 2 1/2"
- Male Thread Adaptor HDPE 90mm x 3"
- Male Thread Adaptor HDPE 110mm x 4"
- Female Thread Adaptor HDPE 20mm x 1/2"
- Female Thread Adaptor HDPE 20mm x 3/4"
- Female Thread Adaptor HDPE 25mm x 1/2"
- FemaleThread Adaptor HDPE 25mm x 3/4"
- Female Thread Adaptor HDPE 25mm x 1"
- Female Thread Adaptor HDPE 32mm x 3/4"
- Female Thread Adaptor HDPE 32mm x 1"
- Female Thread Adaptor HDPE 40mm x 1 1/4"
- Female Thread Adaptor HDPE 50mm x 1 1/2"
- Female Thread Adaptor HDPE 63mm x 2"
- Female Thread Adaptor HDPE 75mm x 2 1/2"
- Female Thread Adaptor HDPE 90mm x 3"
- Female Thread Adaptor HDPE 110mm x 4"
- Male Thread Elbow HDPE 20mm x 1/2"
- Male Thread Elbow HDPE 20mm x 3/4"
- Male Thread Elbow HDPE 25mm x 1/2"
- Male Thread Elbow HDPE 25mm x 3/4"
- Male Thread Elbow HDPE 32mm x 3/4"
- Male Thread Elbow HDPE 32mm x 1"
- Male Thread Elbow HDPE 50mm x 1 1/2"
- Male Thread Elbow HDPE 63mm x 2"
- Male Thread Elbow HDPE 75mm x 2 1/2"
- Male Thread Elbow HDPE 90mm x 3"
- Male Thread Elbow HDPE 110mm x 4"
- Male Tee HDPE 20 mm x 1/2"
- Male Tee HDPE 20 mm x 3/4"
- Male Tee HDPE 25 mm x 1/2"
- Male Tee HDPE 25 mm x 3/4"
- Male Tee HDPE 25 mm x 1"
- Male Tee HDPE 32 mm x 3/4"
- Male Tee HDPE 20 mm x 1"
- Male Tee HDPE 50 mm x 1"
- Male Tee HDPE 50 mm x 1 1/2"
- Male Tee HDPE 63 mm x 2"
- Male Tee HDPE 75 mm x 2 1/2"
- Male Tee HDPE 90 mm x 2"
- Male Tee HDPE 90 mm x 3"
- Male Tee HDPE 110 mm x 4"
- Female Tee HDPE 20mm x 1/2"
- Female Tee HDPE 20mm x 3/4"
- Female Tee HDPE 25mm x 1/2"
- Female Tee HDPE 25mm x 3/4"
- Female Tee HDPE 32mm x 3/4"
- Female Tee HDPE 32mm x 1"
- Female Tee HDPE 50mm x 1 1/2"
- Female Tee HDPE 63mm x 2"
- Female Tee HDPE 75mm x 2 1/2"
- Female Tee HDPE 90mm x 3"
- Female Tee HDPE 110mm x 4"
- Female Thread Elbow HDPE 1/2"
- Female Thread Elbow HDPE 3/4"
- Female Thread Elbow HDPE 1"
- Female Thread Elbow HDPE 1 1/4"
- Female Thread Elbow HDPE 1 1/2"
- Female Thread Elbow HDPE 2"
- Female Thread Elbow HDPE 2 1/2"
- Female Thread Elbow HDPE 3"
- Female Thread Elbow HDPE 4"
- Reducing Tee HDPE Dia 25 x 20 mm
- Reducing Tee HDPE Dia 32 x 20 mm
- Reducing Tee HDPE Dia 32 x 25 mm
- Reducing Tee HDPE Dia 40 x 32 mm
- Reducing Tee HDPE Dia 50 x 25 mm
- Reducing Tee HDPE Dia 50 x 32 mm
- Reducing Tee HDPE Dia 50 x 40 mm
- Reducing Tee HDPE Dia 63 x 32 mm
- Reducing Tee HDPE Dia 63 x 40 mm
- Reducing Tee HDPE Dia 63 x 50 mm
- Reducing Tee HDPE Dia 75 x 50 mm
- Reducing Tee HDPE Dia 75 x 63 mm
- Reducing Tee HDPE Dia 90 x 63 mm
- Reducing Tee HDPE Dia 90 x 75 mm
- Reducing Tee HDPE Dia 110 x 63 mm
- Reducing Tee HDPE Dia 110 x 90 mm
- Giboult Joint PVC Ø 250 mm
- Bend GI Ø 100 mm x 90
- Stup End / DOP Ø 75 mm
- Stup End / DOP Ø 100 mm
- Sewa Tripot/Tackel & Handle Crane 2 T
- Tee PVC ∅ 6 X 3''
- Tee PVC ∅ 4''
- Tee HDPE ∅ 4x4''
- Tee HDPE ∅ 6X4'
- Tee GI ∅ 3''
- Tee GI ∅ 4''
- WaterMeter 1/2 Inch
- Gate Valve GI ∅ 4''
- Gate Valve GI ∅ 3''
- Gate Valve GI ∅ 2''
- Bend GI 45º ∅ 4''
- Over Shock PVC ∅ 4x6''
- Stub End HDPE ∅ 3''
- Stub End HDPE ∅ 4''
- Gate Valve 3''
- Gate Valve 4''
- Air Valve Dia 4''
- Air Valve Dia 3''
- Air Valve Dia 2''
- Clamp Gantung Besi ∅ 4''
- Shakle
- Thimbel
- Clamp Besi Dia. 4''
- Clamps Sling Baja
- Sling Baja 8mm
- Cap/Dop PVC Dia 3''
- Cap/Dop PVC Dia 4''
- Cap/Dop GI Dia 4''
- Lem Pipa
- Baut Mur Baja 8 x 15mm
- Baut Mur Baja 8 x 20 mm
- Angker Baut
- Karet Packing 3mm
- Equal Elbow Hdpe ∅ 1/2''
- Angle Lockable ∅ 1/2''
- Stop Kran (Brass) ∅1/2''
- Double Niple GI ∅ 1/2''
- Knie GI ∅ 1/2''
- Tee GI ∅ 1/2''
- Plug GI ∅ 1/2''
- Altap Kran CI ∅ 1/2''
- Seal Tape Jumbo
- Man Hole Plat 0.6 x 0.6 x 0.5
- Pemasangan Sambungan Rumah
24 Pompa Air
- Mesin pompa air mancur
- Mesin Alcon 3 inchi
- Mesin pompa air
- Pompa Air zhimitsu
- Mesin Pompa Vacum
- Gunting Pangkas
25 Unit Pemeliharaan Lapangan Lainnya
- Gunting Pangkas
- Gembor
- Gunting Stek
26 Selang Air
- Selang 1/2
- Selang air spiral 3 inchi
27 Fire Tool (Garu Pacul/ Cangkul)
- Parang
- Tembilang
- Pacul
- Pacul
- Pacul Buaya
- Cangkul Kecil / Bengkok
- Sekop Crocodile Cap Mata
- Sekop
- Cangkul Kecil / Bengkok
28 Alat Bantu Lainnya
Jasa Service Pemeliharaan Alat Bantu
-
Perlengkapan Kebakaran Hutan
- Jasa Service Alat Bantu Pengolahan Air Kotor
29 Gerobak Dorong
- Arco Senko
- Angkringan
30 Papan Visual/Papan Nama
- Papan Plang Tanah
- Papan Plang Jalan
- Papan Plang Tanah
- Papan Plang Tanah
- Papan Plang Tanah
- Papan Plang Tanah
- Papan Plang Tanah
- Papan Plang Bangunan
- Papan Plang Tanah
- Papan Plang Tanah
31 Treng Air/Tandon Air
- Tandon air 1200 L
Dudukan tandon (Tower air) Besi Baja 4 inc
-
Tinggi 3 m
32 Hidran Kebakaran
- Perbaikan uji fungsi (Hidran)
33 Pakaian Panas/Lengkap
- Fire Jacket Pemadam
- masker pemadam
34 Alat Pembantu Kebakaran
- Adaptor Selang Pemadam1.5 "
- Adaptor Selang Pemadam 2.5 "
- Selang Pemadam1.5 "
- Conection (cabang) Selang Pemadam1.5 "
- Conection (cabang) Selang Pemadam2.5 "
- Selang Pemadam 215 "
- Nozzle Pemeliharaan Alat Bantu Perlengkapan Kebakaran Hutan
- Valve Pemeliharaan Alat Bantu Perlengkapan Kebakaran Hutan
35 Pipa Plastik
- Pipa Plastik
- Pipa Union untuk Kabel 5/8 inci - 4 m
- Pipa Listrik PVC / 5/8
Pipa Union untuk Kabe1 Type NYB ( NYM ) 2 x 4
-
mm
- Pipa Union untuk Kabel3/4 inci -4 m
- Pipa Union untuk Kabe1 inci - 4 m
Pipa Union untuk Kabe1 Type NYA ( NYM )2 x
-
2.5 mm
Pipa Union untuk Kabe1 Type NYB ( NYM )2 x
-
1.1/2 mm
36 Batang Bambu/Besi
- Besi Bulat 1" bangunan ged
- Besi Pengikat baja Profil design (Blocking) bangunan ged
- Besi Bulat 1,25" bangunan ged
- Box Lampu 2 Aspek
- Box Lampu 2 Aspek Dia 30 cm
- Box Lampu 3 aspek
- Cat Kilap
37 - Bangunan Gedung Kantor Permanen
- Rumah Dinas Type A
- Rumah Dinas Type Khusus
- Gedung Non Bertingkat Sederhana
- Gedung Non Bertingkat Non Sederhana
- Gedung Non Bertingkat Khusus
- Gedung Bertingkat Sederhana
- Gedung Bertingkat Non Sederhana
- Rumah Dinas Type C, D, E
- Gedung Bertingkat Khusus
- Rumah Dinas Type B
- Bangunan Fisik Kebun Bibit
- Pembangunan Jamban Tingkat TK
- Pembangunan Ruang Guru Tingkat SD
- Pembangunan Ruang Guru Tingkat TK
Pembangunan Area Bermain dan APE Luar
-
Tingkat TK
- Pembangunan Lab. Komputer Tingkat SD
- Pembangunan Perpustakaan Tingkat SD
38 Pagar Permanen
- Pagar Rumah Negara Type A Samping
- Pagar Rumah Negara Type A Depan
- Pagar Rumah Negara Type B Depan
- Pagar Rumah Negara Type B Samping
- Pagar Rumah Negara Type C Samping
- Pagar Rumah Negara Type C Depan
- Pagar Gedung Kelas Tidak Sederhana Samping
- Pagar Gedung Kelas Tidak Sederhana Depan
- Pagar Samping/Belakang
- Pagar Depan
Bangunan Gorong-Gorong (Bangunan Pelengkap
39
Irigasi)
- Boxculvert uk 40 x 2400 cm K. 350
- Boxculvert uk 150 x 100 cm K. 350
- Boxculvert uk 60 x 60 cm K. 350
- Buku Koleksi PAUD
- Buku Koleksi Perpustakaan SMP
40 Pekerjaan Rangka Atap
- Pasang Atap Genteng Metal
- Pasang Nok Paten 1.05m
- Pasang Nok Stel Gelombang 1.08m
- Pasang Atap Asbes Gelombang
- Dinding lambriziring dari papan kayu kelas I
Dinding lambriziring dari plywood ukuran (120 x
-
240) cm
- Memasang langit-langit asbes semen
- Memasang langit-langit akustik
- Memasang langit-langit tripleks
Memasang langit-langit lambriziring kayu, tebal 9
-
mm
- Memasang langit-langit gypsum board
- Memasang list langit-langit kayu profil
- Pasang Rangka Atap Baja Ringan
Pasang Rangka Plafond Baja Ringan (60cm x
-
120cm)
Lisplank ukuran kayu kelas kelas II (2.2 cm x 20
-
cm)
- Rangka langit-langit kayu kelas III
- Rangka atap genteng keramik, kayu kelas II
- Konstruksi gordeng, kayu kelas II
- Konstruksi kuda-kuda expose, kayu kelas I
Konstruksi kuda-kuda konvensional, kayu kelas II
-
bentang 6 m
- Teakwood rangkap, rangka expose kayu kelas I
Rangka dinding pemisah (60 x 120) cm kayu
-
kelas II atau III
- Pas. Kusen Jendela Kaca Bahan Aluminium
- Pas. Rangka Dinding Pemisah Bahan Aluminium
- Pasang Atap Genteng Kodok / Glazzur
- Pasang Genteng Bubung Kodok Glazzur
- Pasang Rooflight Fiberglass ( 180 x 90 ) cm
- Pek. Pipa GI Æ 2.5" Medium A
- Pek. Plat Lantai Plat Baja (195 M2)
- Pek. Tali Slink
- Pek. Pengelasan
- Talang Patahan Atap
- Pasang Nok Alluminium
- Pasang Atap Alluminium
- Pasang Atap Nok Seng
- Pasang Atap Seng Gelombang
- Pasang Nok Genteng Metal
- Pasang Atap Sirap
- Pasang Nok Stel rata 1.05m
41 Pekerjaan Pasangan
- Pelaburan Bidang Kayu dengan Vernis
- Lantai Kramik Anti Slip ukuran (20 x 20) cm,
Lantai keramik ukuran (10 x 40) cm,
-
variasi/border
- Lantai keramik ukuran (20 x 20) cm
- Lantai keramik ukuran (30 x 30) cm
- Lantai keramik ukuran (40 x 40) cm
Pengecatan Tembok Baru ( 1 x Plamir, 1 x Cat
-
Dasar, 2 x Cat Penutup )
Tegel Keramik Anti Slip (KM/WC) ukuran 40 x 40
-
cm
- Pasang dan Set Box Lampu trafic
Pengecatan Kayu Baru (1 x Plamir ,1 x Cat
-
Dasar, 2 xCat Penutup)
- Pelaburan Bidang Kayu dengan Teak Oil
Pelaburan Bidang Kayu dengan Cat Residu dan
-
Ter
- Mendempul dan Menggosok Kayu
- Memasang Dinding Granik ukuran (60 x 60) cm
Memasang lantai Tegel Brico Taracota ukuran
-
(30 x 30) cm
Memasang lantaiTegel Pengarah ukuran (30 x
-
30) cm
- Plint keramik ukuran (10 x 20) cm
- Lantai ubin teraso ukuran (30 x 30) cm
- Lantai ubin teraso ukuran (40 x 40) cm
- Lantai ubin warna ukuran (20 x 20) cm
- Lantai ubin warna ukuran (30 x 30) cm
- Tempat Sabun Keramik
- Tegel Kuku/Sudut
- Tegel Dinding Keramik ukuran 20 x 25 cm
- Pekerjaan Lantai Kaca
- Pekerjaan Karet Lantai Kaca
- Pekerjaan Bingkai Lantai Kaca
42 Pekerjaan Bukaan (jendela, pintu, kusen)
Kusen pintu dan kusen jendela, kayu kelas II
-
atau III
- Pintu klamp standar, kayu kelas II
- Pintu klamp sederhana, kayu kelas III
- Daun pintu panel, kayu kelas I atau II
- Pintu dan jendela kaca, kayu kelas I atau II
- Daun pintu kayu lapis (plywood) rangkap
Pintu plywood rangkap, rangka expose kayu
-
kelas II
- Jalusi kusen, kayu kelas II
- Kusen pintu dan kusen jendela, kayu kelas I
43 Pekerjaan Finishing
- Pengecatan Tiang dan Patok Pengaman
44 Pekerjaan Pencegahan Kebakaran
Jasa Retribusi Pemeriksaan Alat Pemadam
-
Kebakaran
45 Pekerjaan Instalasi Listrik
- Pembongkaran Panel
- KWH Meter 3000 VA
- Penyambungan Listrik (PLN)
- Pembuatan Dudukan box Control trafic
- KWH Meter 2200 VA
- KWH Meter 3500 VA
- KWH Meter 4400 VA
- KWH Meter 5500 VA
- KWH Meter 6600 VA
- KWH Meter 7700 VA
- KWH Meter 10500 VA
- KWH Meter 11000 VA
- KWH Meter 13200 VA
- Pemasangan Armature Set
- Pembongkaran Tiang dan Armature Set
- Pemasangan Tiang
Pemasangan Armature dan Penyambungan
-
Instalasi
- Pemasangan Panel
- Penarikan Kabel Tanam
- Pek. Pasangan Instalasi Titik Lampu
- Pek. Pasangan Lampu Sorot 150 watt LED
Pek. Lampu Hias Neon Flex
-
jembatan+Control+acesories
Pek. Lampu Hias Neon Flex
-
anjungan+Control+acesories
- Lampu Emergency LED
- Penyambungan PLN / KWH 5500 watt
- Pekerjaan Tangga Kontrol
- Pek. Cat Besi
- Pek. Pasangan Penangkal Petir
Pek. Pasang Huruf Acrilik Menyala T=100
-
cm+Acesories
Pek. Pasang Huruf Acrilik Menyala T=60
-
cm+Acesories
- R-1/TR 900 VA
- R-1/TR 1300 VA
- R-1/TR 2200 VA
- R-2/TR 3500 s.d 5500 VA
- R-3/TR 6600 VA ke atas
- B-3/TR 6600 s.d 200 kVA
- B-3/TM di atas 200 kVA
- i-3/TM di atas 200 kVA
- i-4/TT 30.000 ke atas
- L/TR, TM, TT
- Pek. Pemasangan ACP + Rangka (Dinding)
- Pek. Pemasangan ACP + Rangka (Lantai)
- Pek. Besi Plintir
- Pek.Tali Slink Dia 36 MM
- Pek.Gelagar Melintang Lantai Besi Siku 50.50.6
Pek.Gelagar Memanjang Lantai Besi Plat C
-
125.50.20.2,3
- Pek.Besi Plat Tebal 3 mm
- Pek.Pas Spelter Socket
- Pek.Hollow Stanlist
Pek.Pas. 316 Stainless Steel Rope Mesh Netting
-
dia 1.5 mm
- Pek.Sambungan
- Pek. Las
- Pekerjaan Galian Tanah Pondasi
- Pekerjaan Galian Tanah Untuk Kabel
- Pekerjaan Galian Aspal Untuk Kabel
- Pekerjaan Urugan Kembali Bekas Galian
Pekerjaan Pemasangan Pipa Galvanis 1,5"
-
Pelindung Kabel Tanah
Pekerjaan Perbaikan Bekas Galian Aspal Untuk
-
Kabel
- Pekerjaan Cor Beton Pondasi Tiang PJU
- Pekerjaan Besi Beton Pondasi Tiang PJU
- Pekerjaan Bekisting Kayu
- Pekerjaan Persiapan
- KWH Meter 16500 VA
- KWH Meter 23000 VA
- KWH Meter 33000 VA
- KWH Meter 1300 VA
46 Pekerjaan Pasangan Batu
Pas. bata merah tebal 1/2 bata, camp.1 PC : 2
-
Ps
Pas. bata merah tebal 1/2 bata, camp.1 PC : 4
-
Ps
Pas. bata merah tebal 1/2 bata, camp.1 PC : 5
-
Ps
- Plesteran 1 PC : 2 Ps, tebal 15mm
- Plesteran 1 PC : 3 Ps, tebal 15mm
- Plesteran 1 PC : 4 Ps, tebal 15mm
- Plesteran 1 PC : 5 Ps, tebal 15mm
- Plesteran 1 PC : 3 Ps, tebal 15 dilicin
- Plesteran Skoning 1 PC : 2 Ps, lebar 10 mm
- Plesteran Ciprat 1 PC : 2 Ps
- Memasang 1 m2 acian
Pekerjaan Pekerjaan Gorong-Gorong dan Drainase
47
Beton
- Bahan Drainase Porous atau Penyaring (Filter)
- Pasangan Batu tanpa Adukan (Aanstamping)
Saluran berbentuk U Tipe DS 3a (dengan tutup),
-
type 100
- Saluran berbentuk U Tipe DS 3, type 100
- Controller 4 Phase 2 Pedestrian Box Luar
- Galian untuk Selokan Drainase dan Saluran Air
- Pasangan Batu dengan Mortar
Gorong-gorong Pipa Beton Tanpa Tulangan
-
diameter dalam 30 cm
Gorong-gorong Pipa Beton Bertulang, diameter
-
dalam 40 cm
Gorong-gorong Pipa Beton Bertulang, diameter
-
dalam 60 cm
Gorong-gorong Kotak Beton Bertulang, ukuran
-
dalam 120 cm x 120 cm
- Saluran berbentuk U Tipe DS 1, type 60
Saluran berbentuk U Tipe DS 1a (dengan tutup),
-
type 60
Saluran berbentuk U Tipe DS 2a (dengan tutup),
-
type 80
Gorong-gorong Pipa Beton Bertulang, diameter
-
dalam 80 cm
- Saluran berbentuk U Tipe DS 2, type 80
Gorong-gorong Kotak Beton Bertulang, ukuran
-
dalam 100 cm x 100 cm
- Pembersihan Lantai Gedung
- Pembersihan Kaca Gedung
Pembersihan Kaca Jendela Luar Gedung Lantai
-
02
- Pembersihan KM / WC
Pek. Pembabatan Rumput dan Pembersihan
-
Halaman Kantor / Area Parkir
- Pembersihan Drainase
- Pembersihan Meja, Lemari, Perabot Kantor
- Pemeliharaan Taman / Bunga
- Pembersihan Karpet
- Pekerjaan Pembersihan Jalan Aspal
- Pembersihan sungai/kali/saluran
- Pembersihan drainase
- Pembersihan Pesisir Pantai
48 Pekerjaan Galian
- Galian Batu
- Penggalian dan Penutupam Galian Kabel
- Menggali tanah biasa sedalam 1 meter
- Menggali tanah biasa sedalam 2 meter
- Menggali tanah biasa sedalam 3 meter
- Menggali tanah keras sedalam 1 meter
- Menggali tanah cadas sedalam 1 meter
- Menggali tanah lumpur sedalam 1 meter
- Galian Biasa
- Galian Batu Lunak
- Galian Struktur dengan kedalaman 0 - 2 meter
- Galian Struktur dengan kedalaman 2 - 4 meter
- Galian Struktur dengan kedalaman 4 - 6 meter
Galian Perkerasan Beraspal dengan Cold Milling
-
Machine
Galian Perkerasan Beraspal tanpa Cold Milling
-
Machine
- Galian Perkerasan berbutir
- Galian Perkerasan Beton
49 Pekerjaan Timbunan
- Timbunan Pilihan dari galian
- Pengurugan Kembali 1 M3 Galian
- Pengurugan 1 M3 Dengan Pasir Urug
- Timbunan Biasa dari hasil galian
- Timbunan Pilihan dari sumber galian
- Timbunan Biasa dari sumber galian
50 Pekerjaan Penyiapan Badan Jalan
- Penyiapan Badan Jalan
Pekerjaan Pembersihan, Pengupasan Lahan, dan
51
Pemotongan Pohon
Pemotongan Pohon Pilihan diameter > 75 cm
Pemotongan Pohon Pilihan diameter > 30 – 50
-
cm
- Geotekstil Separator Kelas 1
Geotekstil Filter untuk Drainase Bawah
-
Permukaan (Kelas 2)
Pemotongan Pohon Pilihan diameter > 50 – 75
-
cm
52 Pekerjaan Lapis Pondasi Agregat
Lapis Pondasi bawah Beton Kurus (Concrete
-
Vibrator)
- Lapis Pondasi Agregat Kelas S
- Lapis Permukaan Agregat Tanpa Penutup Aspal
- Lapis Pondasi Agregat Tanpa Penutup Aspal
- Lapis Pondasi Agregat Kelas A
- Lapis Pondasi Agregat Kelas B
53 Pekerjaan Perkerasan Beton Semen
- Perkerasan Beton Semen (OPC Tipe I + Fly ash)
Perkerasan Beton Semen dengan Anyaman
-
Tulangan Tunggal
- Perkerasan Beton Semen (PPC)
Pekerjaan Lapis Beton Semen Pondasi & Pondasi
54
Bawah (Ctb & Ctsb)
- Batu kosong (aanstamping)
- Pondasi batu gunung, campuran 1 Pc : 4 Ps
- Pondasi batu Gunung, campuran 1 Pc : 3 Ps
Pondasi siklop, 60% beton campuran 1 Pc : 2
-
Ps : 3 Kr dan 40% batu
- Pondasi batu gunung, campuran 1 Pc : 5 Ps
55 Pekerjaan Lapis Resap Pengikat & Lapis Perekat
- Lapis Resap Pengikat - Aspal Cair/Emulsi
- Lapis Perekat - Aspal Cair/Emulsi
Pekerjaan Laburan Aspal Satu Lapis (Burtu) &
56
Laburan Aspal Dua Lapis (Burda)
- Laston Lapis Fondasi (AC-Base)
- Laston Lapis Aus (AC-WC)
- Laston Lapis Antara (AC-BC)
57 Pekerjaan Lapis Perata Penetrasi Macadam
- Lapis Penetrasi Macadam
- Lapis Penetrasi Macadam Asbuton
58 Pekerjaan Pemeliharaan Dengan Laburan Aspal
- CPHMA Kemasan Kantong
- Bahan anti pengelupasan
59 Pekerjaan Beton
- Bekisting untuk sloof
- Lantai Kerja Beton mutu K 125
- Beton mutu K 175
- Beton mutu K 250
- Beton mutu K 300
- Beton mutu K 400
- Beton Siklop, fc’15 Mpa
- Beton , fc’15 Mpa
- Beton strukur, fc’20 MPa
- Beton struktur, fc’25 Mpa
- Beton struktur, fc’30 MPa
- Beton struktur, fc’35 MPa
- Beton struktur, fc’40 MPa
- Beton struktur, fc’45 MPa
- Beton struktur, fc’50 MPa
- Bekisting untuk lantai
- Bekisting untuk balok
- Bekisting untuk kolom
- Beton, fc’10 Mpa
60 Pekerjaan Baja Struktur
Dinding Sumuran Silinder terpasang, Diameter
-
…………….
Pemancangan Tiang Pancang Beton Pratekan
-
Pracetak ukuran 400 mm x 400 mm
Pemancangan Tiang Pancang Beton Bertulang
-
Pracetak ukuran 350 mm x 350 mm
Penyediaan Tiang Pancang Beton Pratekan
-
Pracetak ukuran 400 mm x 400 mm
Penyediaan Tiang Pancang Beton Bertulang
-
Pracetak ukuran 350 mm x 350 mm
- Baja Tulangan Sirip BjTS 420A
- Baja Tulangan Polos-BjTP 280
- Penyediaan Panel Full Depth slab
- Penyediaan Panel Full Depth slab
- Baja Prategang
Penyediaan Unit Pracetak Gelagar Tipe I
-
Bentang 25 meter
Penyediaan Unit Pracetak Gelagar Tipe I
-
Bentang 16 meter
61 Pekerjaan Pemasangan Jembatan Rangka Baja
Pemasangan Unit Pracetak Gelagar Tipe I
-
Bentang 25 meter
Pemasangan Unit Pracetak Gelagar Tipe I
-
Bentang 16 meter
62 Pekerjaan Pondasi Sumuran
- Pondasi sumuran, diameter 100 cm
- Pekerjaan Pasangan Batu
- Pasangan Batu
63 Pekerjaan Pasangan Batu Kosong & Bronjong
- Pasangan Batu Kosong
- Bronjong dengan kawat yang dilapisi Galvanis
64 Pekerjaan Sambungan Ekspansi (Expansion Joint)
Sambungan Siar Muai Expansion Tipe Karet
-
dengan Lebar Celah …….. Cm
Sambungan Siar Muai Tipe Modular, Lebar
-
……..
- Sambungan Siar Muai Tipe Compression Seal
Sambungan Siar Muai Expansion Joint Tipe
-
Modular, lebar ……..
- Sambungan Siar Muai Tipe Strip seal
- Sambungan Siar Muai Tipe Asphaltic Plug, Fixed
- Joint Filler untuk Sambungan Konstruksi
Sambungan Siar Muai Expansion Joint Tipe
-
Finger Plate, lebar ……..
65 Pekerjaan Perletakan (Bearing)
- Landasan Tipe Logam Jenis Spherical
Landasan Elastomerik Karet Sintetis Berlapis
-
Baja Ukuran ….. Mm x ….. Mm x…….. Mm
Landasan Elastomerik Karet Alam Berlapis Baja
-
Ukuran ….. Mm x ….. Mm x…….. Mm
- Landasan karet Strip
- Landasan Logam Tipe Moveable
- Landasan Logam Tipe Fixed
- Landasan Tipe Logam Berongga (Pot Bearing)
66 Pekerjaan Sandaran (Railing)
- Sandaran (Railing)
67 Pekerjaan Papan Nama Jembatan
- Papan Nama Kegiatan
- Papan Nama Jembatan
68 Pekerjaan Pembongkaran Struktur
- Pembongkaran Lantai Jembatan Kayu
- Pembongkaran Beton
- Pembongkaran Pasangan Batu
- Pembongkaran Panel
- Pembongkaran Tiang dan Almatur Set
69 Pekerjaan Harian
- Perkerasan Blok Beton pada Trotoar dan Median
- Pekerja
- Pekerja
- Tukang Bongkar
- Tukang Bongkar
- Tukang Kayu
- Tukang Kayu
- Tukang Batu
- Tukang Batu
- Tukang Besi
- Tukang Besi
- Tukang Khusus alluminium
- Tukang Khusus alluminium
- Tukang Las
- Tukang Las
- Tukang Cat
- Tukang Cat
- Tukang Pipa
- Tukang Pipa
- Kepala Tukang
- Kepala Tukang
- Mandor
- Mandor
- Operator
- Operator
- Pembantu Operator
- Pembantu Operator
- Sopir/driver
- Sopir/driver
- Pembantu Sopir
- Pembantu Sopir
- Mekanik
- Mekanik
- Pembantu Mekanik
- Pembantu Mekanik
- Marka Jalan Termoplastik
Rambu Jalan Tunggal dengan Permukaan
-
Pemantul Engineering Grade
- Patok Pengarah
- Patok Kilometer
- Rel Pengaman
- Paku Jalan Tidak Memantul
- Paku Jalan Memantul Bujur Sangkar
- Paku Jalan Memantul Persegi panjang
- Paku Jalan Memantul Bulat
- Kerb Pracetak Jenis 1 (Peninggi/Mountable)
- Kereb
Pekerjaan Pracetak Jenis
Pemeliharaan 6 (Kereb
Rutin dengan Bukaan)
Perkerasan, Bahu
70 Jalan, Drainase, Perlengkapan Jalan, & Jembatan
- Laburan Aspal (Buras)
- Latasir Kelas A (SS-A)
- Latasir Kelas B (SS-B)
Tambalan Dangkal dengan Beton Semen Cepat
- Mengeras untuk Pembbukaan Lalu Lintas Umur
Beton < 24 jam
Tambalan Penuh dengan Beton Semen Cepat
- Mengeras untuk Pembukaan Lalu Lintas Umur
Beton < 24 jam
- Pemasangan Ruji (Dowel)
- Pemasangan Sealant
Galian pada Saluran Air atau Lereng untuk
-
Pemeliharaan
Timbunan Pilihan pada Lereng Tepi Saluran
-
untuk Pemeliharaan
- Perbaikan Lapis Fondasi Agregat Kelas A
- Perbaikan Lapis Fondasi Agregat Kelas B
- Perbaikan Lapis Fondasi Agregat Kelas S
- Perbaikan dan Perataan Permukaan JalanTanah
Perbaikan dan Perataan Permukan Perkerasan
-
Berbutir Tanpa Penutup Aspal
- Perbaikan Campuran Aspal Panas
- Perbaikan Campuran Aspal Panas dengan
Asbuton
- Perbaikan Perkerasan Beton Semen
- Perbaikan Lapis Fondasi Bawah Beton Kurus
- Perbaikan Pasangan Batu
- Pengecatan Kereb pada Trotoar atau Median
- Perbaikan Rel Pengaman
- Pembersihan Patok
- Pembersihan Rambu
- Pembersihan Drainase
- Pengendalian Tanaman
- 1 M3 Galian Tanah Biasa Sedalam < 1 M
- 1 M3 Galian Tanah Berbatu Sedalam < 1 M
1 M3 Galian Tanah Dengan Alat Berat
-
(Excavator)
71 Pekerjaan Tanah
1 m3 Pemadatan Tanah Di
- Datangkan/Pemadatan Tanah Termaksud
Peralatan dan Perapihan
Mengangkut 1 m3 Material Atau Hasil Galian
-
Dengan Jarak Angkut 100 M
1 m3 Timbunan Tanah Atau Urugan Tanah
-
Kembali Termaksud Peralatan dan Perapihan
Mengangkut 1 m3 Material Atau Hasil Galian
-
Dengan Jarak Angkut 50 M
1 m3 Timbunan Pasir Sebagai Bahan Pengisi
- Termaksud Peralatan dan Perapihan Angkutan >
100 Meter
1 m3 Timbunan Pasir Sebagai Bahan Pengisi
-
Termasuk Peralatan dan Perapihan
72 Pekerjaan Pasangan
1 m3 Pasangan Bronjong Kawat pabrikasi untuk
- uk. L=2,0m x B=1,0 m x T= 0,5 m + Angkutan
>100 meter
- Pemasangan 1 m2 bekesting untuk kolom
- Pemasangan 1 m2 bekesting untuk balok
- Pemasangan 1 m2 bekesting untuk Lantai
- Pemasangan 1 m2 bekesting untuk Dinding
- Pemasangan 1 Kg Besi Profil
- Pemasangan Rangka Kuda Kuda Baja IWF
Pemasangan 1 m2 Dinding Bata Merah
-
(5x11x22) cm tebal 1 batu camp. 1 PC : 2 PP
Pemasangan 1 m2 Dinding Bata Merah
-
(5x11x22) cm tebal 1 batu camp. 1 PC : 3 PP
Pemasangan 1 m2 Dinding Bata Merah
-
(5x11x22) cm tebal 1 batu camp. 1 PC : 4 PP
Pemasangan 1 m2 Dinding Bata Merah
-
(5x11x22) cm tebal 1 batu camp. 1 PC : 5 PP
- Pebaikan Pasangan Batu dengan Mortar
Mortar tipe N (mutu PP tertentu setara dengan
-
campuran 1 PC:4 PP)
Mortar tipe N (mutu PP tertentu setara dengan
-
campuran 1 PC:4 PP) + Angkutan >100 meter
Mortar tipe N (mutu PP tertentu setara dengan
- campuran 1 PC:4 PP) menggunakan Batu Lokal
+ Angkutan >100 meter
Mortar tipe O (mutu PP tertentu setara dengan
-
campuran 1 PC:5 PP)
Mortar tipe O (mutu PP tertentu setara dengan
-
campuran 1 PC:5 PP) + Angkutan >100 meter
Siaran dengan mortar jenis PC-PP tipe M (mutu
-
PP tertentu setara dengan campuran 1 PC:2 PP)
Siaran dengan mortar jenis PC-PP tipe S (mutu
-
PP tertentu setara dengan campuran 1 PC:3 PP)
Trasraam tebal 1,5 cm, dengan mortar jenis PC-
-
PP tipe M ( campuran 1 PC:2 PP)
Plesteran tebal 1,5 cm, dengan mortar jenis PC-
-
PP tipe S ( campuran 1 PC:3 PP)
Plesteran tebal 1,5 cm, dengan mortar jenis PC-
-
PP tipe N ( campuran 1 PC:4 PP)
Plesteran tebal 1,5 cm, dengan mortar jenis PC-
- PP tipe N ( campuran 1 PC:4 PP) + Angkutan
>100 meter
- A.4.4.2.6. Pekerjaan 1 M2 Acian Dinding
A.4.4.2.6. Pekerjaan 1 M2 Acian Dinding +
-
Angkutan >100 meter
- Pasangan Batu Kosong (1 m3)
Pasangan Batu Kosong (1 m3) ( campuran 1
-
PC:4 PP) + Angkutan >100 meter
1 m3 Pasangan Bronjong Kawat pabrikasi untuk
- uk. L=2,0m x B=1,0 m x T= 0,5 m berisi batu
kali/belah
- Pemasangan Almatur Set
- Penarikan Kabel Udara
- Pemasangan Tiang
- Pemasangan Almatur & Penyambung Instalasi
- Pemasangan Panel
- Penarikan Kabel Tanam
Pemasangan 1 M3 Pondasi Batu Belah 1
-
PC:4PP
Pemasangan 1 M3 Pondasi Batu Belah 1
-
PC:6PP
Pemasangan 1 M3 Pondasi Batu Belah 1
-
PC:8PP
Pemasangan 1 M3 Pondasi Batu Belah 1
-
KP:1SM:2PP
Pemasangan 1 M3 Pondasi Batu Belah 1
-
PC:3KP:10PP
Pemasangan 1 M3 Pondasi Batu Belah 1/4
-
PC:1KP:4PP
Pemasangan 1 M3 Pondasi Batu Kosong
-
(aanstamping )
- Pemasangan 1 M3 Acian
Pemasangan 1 m2 Dinding Bata Merah
-
(5x11x22) cm tebal 1/2 batu camp. 1 PC : 4 PP
Pembuatan 1 m3 Beton Mutu fc 12.2 Mpa
-
(K150),slump (12±2) cm, w/c =0.72
- Penggalian 1 m3 tanah biasa sedalam 1 m
- Penggalian 1 m3 tanah keras sedalam 1 m
- Penggalian 1 m3 tanah cadas sedalam 1 m
- Pengurugan Kembali 1 m3 Galian
- Pengurugan 1 M3 Dengan Pasir Urug
- Pemasangan 1 m Pipa PVC Ф 1,5"
- Pemasangan 1 m Pipa PVC Ф 2"
- Pemasangan 1 m Pipa PVC Ф 2,5"
- Pemasangan 1 m Pipa PVC Ф 3"
- Pemasangan 1 m Pipa PVC Ф 4"
- Pemasangan 1 m Pipa PVC Ф 6"
- Pemasangan 1 m Pipa PVC Ф 6" RRJ
- Pemasangan 1 m Pipa PVC Ф 3" RRJ
Pemasangan 1 M3 Pondasi Batu Belah 1
-
PC:4PP
Pemasangan 1 M3 Pondasi Batu Belah 1
-
PC:6PP
Pemasangan 1 M3 Pondasi Batu Belah 1
-
PC:8PP
Pemasangan 1 M3 Pondasi Batu Belah 1
-
KP:1SM:2PP
Pemasangan 1 M3 Pondasi Batu Belah 1
-
PC:3KP:10PP
Pemasangan 1 M3 Pondasi Batu Belah 1/4
-
PC:1KP:4PP
- Pemasangan 1 M3 Batu Kosong ( aanstamping )
- Pemasangan 1 M2 Acian
Pembuatan 1 m3 Beton Mutu fc 7.4 Mpa
-
(K100 ),slump (12±2) cm,w/c =0.87
Pembuatan 1 m3 Beton Mutu fc 9.8 Mpa
-
(K125 ),slump (12±2) cm,w/c =0.78
Pembuatan 1 m3 Beton Mutu fc 12,2 Mpa
-
(K150),slump (12±2) cm, w/c =0.72
Pembuatan 1 m3 Lantai Kerja Beton Mutu fc 7,4
-
Mpa ( K150),Slump (12±2) cm w/c =0.87
Pembuatan 1 m3 Beton Mutu fc 14,5 Mpa
-
(K175,Slump (12±2) cm w/c =0.66
Pembuatan 1 m3 Beton Mutu fc 16,9 Mpa
-
(K200),Slump (12±2) cm w/c =0.61
Pembuatan 1 m3 Beton Mutu fc 19,3 Mpa
-
(K225),Slump (12±2) cm w/c =0.58
Pembuatan 1 m3 Beton Mutu fc 21,7 Mpa
-
(K250),Slump (12±2) cm w/c =0.56
Pembuatan 1 m3 Beton Mutu fc 24 Mpa
-
(K275),Slump (12±2) cm w/c =0.53
Pembuatan 1 m3 Beton Mutu fc 26,4 Mpa
-
(K300),Slump (12±2) cm w/c =0.52
Pembuatan 1 m3 Beton Mutu fc 28,8 Mpa
-
(K325),Slump (12±2) cm w/c =0.49
Pembuatan 1 m3 Beton Mutu fc 31,2 Mpa
-
(K350),Slump (12±2) cm w/c =0.48
- Pembesian 10 Kg Dengan Besi Polos dan Ulir
- Pemasangan 1 m2 bekesting untuk pondasi
- Pemasangan 1 m2 bekesting untuk sloof
73 Pekerjaan Beton
Pekerjaan 1 m3 beton untuk lantai kerja (Rabat
-
lantai)
Pekerjaan 1 m3 beton mutu, f’c = 7,4 MPa
-
(K100), slump (12±2) cm, w/c = 0,87 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 7,4 MPa
-
(K100), slump (12±2) cm, w/c = 0,87 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 19,3 MPa
-
(K225), slump (12±2) cm, w/c = 0,58 (Molen)
Pekerjaan 1 m3 Balok Beton (150 Kg Besi +
-
Bekisting)
Pekerjaan 1 m3 beton mutu, f’c = 19,3 MPa
-
(K225), slump (12±2) cm, w/c = 0,58 (Manual)
Pekerjaan 1 m3 Plat Beton (125 Kg Besi +
-
Bekisting)
74 Pekerjaan Pintu Air & Peralatan Hidromekanik
Contoh Pintu Angkat No.1;Lebar B=40 mm;H-
-
25mm;HI= 500 mm dan TR = 1050 mm
75 Pekerjaan Lain - Lain
- Mengurug pasir urug
Urugan Tanah Dengan Tanah Didatangkan
-
(Urugan Piliha)
Contoh Pintu Sorong Baja Drat Pemudar (Stand;
-
Tunggal ), b=1,00 h=1,50
Contoh Pintu Sorong Baja Dengan Roda Gigi
-
( Stand Double ) No.I;C 107
Contoh Pintu Sorong Kayu Roda Gigi (Stand
Draat Ganda ) No.1;Lebar
-
B=1500mm;H=1500mm;HI=3000mm dan
TR=3800 mm
- Pembongkaran Aspal
- Mengurug kembali galian
- Pek. Pembuangan Tanah Sejauh 150 M
- Memadatkan tanah (per 20 cm)
76 Pekerjaan Intake
- Intake Kapasitas 3 Ltr/Det
- Intake Kapasitas 1 Ltr/Det
- Intake Kapasitas 1,5 Ltr/Det
- Intake Kapasitas 2 Ltr/Det
77 Pekerjaan Sumur Air Tanah
- Sumur Gali
- Sumur Bor Dangkal H < 50 m
- Sumur Bor Dalam H > 50 m
- Penggalian 1 M3 Tanah Biasa Sedalam 1 m3
- Penggalian 1 M3 Tanah Keras Sedalam 1 M
- Penggalian 1 M3 Tanah Cadas Sedalam 1 M
78 Pekerjaan Distribusi Air Baku
- Pengad./Pemas.Pipa PVC Ф 3/4"
- Pengad./Pemas.Pipa PVC Ф 1/2"
- Pengad./Pemas.Pipa PVC Ф 8"
- Pengad./Pemas.Pipa PVC Ф 6"
Memasang Pipa Galvanis Ø 6" (dibawah
- permukaan jln beraspal dan pengembalian
kondisi)
Memasang Pipa Galvanis Ø 8" (dibawah
- permukaan jln beraspal dan pengembalian
kondisi)
Memasang Pipa Galvanis Ø 10" (dibawah
- permukaan jln beraspal dan pengembalian
kondisi)
- Memasang Pipa PVC Ø ½"
- Memasang Pipa PVC Ø ¾"
- Memasang Pipa PVC Ø 1"
- Memasang Pipa PVC Ø 1½"
- Memasang Pipa PVC Ø 2" (RR z-join)
- Memasang Pipa PVC Ø 2½" (RR z-join)
- Memasang Pipa PVC Ø 3" (RR z-join)
- Memasang Pipa PVC Ø 4" (RR z-join)
- Memasang Pipa PVC Ø 6" (RR z-join)
- Memasang Pipa PVC Ø 8" (RR z-join)
- Memasang Pipa PVC Ø 10" (RR z-join)
- Pek. Pipa GI Æ 15" Medium A
- Pek. Pipa GI Æ 10" Medium
- Pengetesan Jaringan Pipa 10 Inci dan 8 Inci
- Pengetesan Jaringan Pipa 6 Inci dan 4 Inci mm
- Pengetesan Jaringan Pipa 3 Inci
Pas. Bak Valve, Wash Out dan Ventil untuk
-
Valve Dia 10 Inci
Pas.Bak Valve, Wash Out dan Ventil untuk Valve
-
Dia 8 Inci
Pas.Bak Valve, Wash Out dan Ventil untuk Valve
-
Dia 6 Inci
Pas. Bak Valve, Wash Out dan Ventil untuk
-
Valve Dia 3 dan 4 Inci
- Pemasangan Water Meter Dia 6 s/d 10 Inci
- Gate Valve Dia 3 Inci - 6 inci
- Pemasangan Gate Valve Dia 8 inci - 10 Inci
- Pemasangan Flange GI Dia 6 Inci - 8 Inci
- Pemasangan Flange GI Dia 10 Inci- 20 Inci
- Pemasangan Flange Tee GI
Pemasangan Tee Flange PVC (RR) dia 3 Inci - 4
-
Inci
Pemasangan Tee Flange PVC (RR) dia 6 Inci - 8
-
Inci
Pemasangan Tee Flange PVC (RR) dia 10 Inci -
-
20 Inci
- Pemasangan Tee GI
- Pemasangan Bend Pipa PVC dia 3 Inci - 6 Inci
- Pemasangan Bend Pipa PVC dia 8 Inci - 10 Inci
- Pemasangan Flange Spigot Dia 3 Inci - 6 Inci
- Pemasangan Flange Spigot Dia 8 Inci - 10 Inci
Pemasangan Dreser Joint Pipa PVC Dia 6 Inci -
-
10 Inci
Pemasangan Dreser Joint Pipa PVC Dia 12 Inci -
-
20 Inci
- Pemasangan Reduser Tee Pipa PVC
- Pemasangan Reduser Pipa PVC
- Pemasangan Dop Pipa PVC
- Pemasangan Dop Pipa GI
- Pemasangan Air Valve
- Pemasangan Socket Valve
- Kran Air Diameter 1/2"
- Kloset Jongkok Standard INA/Global
- Pemasangan 1 Buah Valve Ф 75 mm
- Pemasangan 1 Buah Valve Ф 100 mm
- Pemasangan 1 Buah Valve Ф 250 mm
- Pemasangan 1 Buah Valve Ф 300 mm
- Pemasangan 1 Buah Water Meter Ф 400 mm
- Pemasangan 1 Buah Water Meter Ф 300 mm
- Pemasangan 1 Buah Water Meter Ф 250 mm
- Pemasangan 1 Buah Water Meter Ф 100 mm
- Pemasangan 1 Buah Water Meter Ф 75 mm
- Pemasangan 1 m Pipa HDPE Ф 75 mm
- Pemasangan 1 m Pipa HDPE Ф 100 mm
- Pemasangan 1 M2 Acian
- Reservoar Kapasitas 5 M3
- Reservoar Kapasitas10 M3
- Reservoar Kapasitas 20 M3
- Reservoar Kapasitas 30 M3
- Reservoar Kapasitas 40 M3
- Reservoar Kapasitas 50 M3
- Pengad./Pemas.Pipa PVC Ф 1/2"
- Pengad./Pemas.Pipa PVC Ф 3/4"
- Pengad./Pemas.Pipa PVC Ф 1"
- Pengad./Pemas.Pipa PVC Ф 1,5"
- Pengad./Pemas.Pipa PVC Ф 2"
- Pengad./Pemas.Pipa PVC Ф 2,5"
- Pengad./Pemas.Pipa PVC Ф 3"
- Pengad./Pemas.Pipa PVC Ф 4"
- Pengad./Pemas.Pipa PVC Ф 6"
- Pengad./Pemas.Pipa PVC Ф 8"
- Pengad./Pemas.Pipa PVC Ф 10"
- Pengad./Pemas.Pipa PVC Ф 12"
- Pengad./Pemas.Pipa PVC Ф 2"
- Pengad./Pemas.Pipa PVC Ф 2,5"
- Pengad./Pemas.Pipa PVC Ф 3"
- Pengad./Pemas.Pipa PVC Ф 4"
- Pengad./Pemas.Pipa PVC Ф 6"
- Pengad./Pemas.Pipa PVC Ф 8"
- Pengad./Pemas.Pipa PVC Ф 10"
- Pengad./Pemas.Pipa PVC Ф 12"
- Pengad./Pemas.Pipa PVC Ф 1/2"
- Pengad./Pemas.Pipa PVC Ф 3/4"
- Pengad./Pemas.Pipa PVC Ф 1"
- Pengad./Pemas.Pipa PVC Ф 1,5"
- Pengad./Pemas.Pipa PVC Ф 2"
- Pengad./Pemas.Pipa PVC Ф 2,5"
- Pengad./Pemas.Pipa PVC Ф 3"
- Pengad./Pemas.Pipa PVC Ф 4"
- Pengad./Pemas.Pipa PVC Ф 6"
- Pengad./Pemas.Pipa PVC Ф 8"
- Pengad./Pemas.Pipa PVC Ф 4"
- Pengad./Pemas.Pipa PVC Ф 12"
- Pengad./Pemas.Pipa PVC Ф 1/2"
- Pengad./Pemas.Pipa PVC Ф 3/4"
- Pengad./Pemas.Pipa PVC Ф 1"
- Pengad./Pemas.Pipa PVC Ф 1,5"
- Pengad./Pemas.Pipa PVC Ф 2"
- Pengad./Pemas.Pipa PVC Ф 2,5"
- Pengad./Pemas.Pipa PVC Ф 3"
- Pengad./Pemas.Pipa PVC Ф 12"
- Pengad./Pemas.Pipa PVC Ф 10"
- Pengad./Pemas.Pipa PVC Ф 8"
- Pengad./Pemas.Pipa PVC Ф 6"
- Pengad./Pemas.Pipa PVC Ф 4"
- Pengad./Pemas.Pipa PVC Ф 3"
- Pengad./Pemas.Pipa PVC Ф 2,5"
- Pengad./Pemas.Pipa PVC Ф 2"
- Pengad./Pemas.Pipa PVC Ф 1,5"
- Pengad./Pemas.Pipa PVC Ф 1"
- Pengad./Pemas.Pipa PVC Ф 10"
- Pengad./Pemas.Pipa PVC Ф 12"
- Pengad./Pemas.Pipa PVC Ф 2"
- Pengad./Pemas.Pipa PVC Ф 2,5"
- Pengad./Pemas.Pipa PVC Ф 3"
- Pengad./Pemas.Pipa PVC Ф 4"
- Pengad./Pemas.Pipa PVC Ф 6"
- Pengad./Pemas.Pipa PVC Ф 8"
- Pengad./Pemas.Pipa PVC Ф 10"
Memasang Pipa Galvanis Ø 4" (dibawah
- permukaan jln beraspal dan pengembalian
kondisi)
Memasang Pipa Galvanis Ø 3" (dibawah
- permukaan jln beraspal dan pengembalian
kondisi)
Memasang Pipa Galvanis Ø 2" (dibawah
- permukaan jln beraspal dan pengembalian
kondisi)
Memasang Pipa Galvanis Ø 1½" (dibawah
- permukaan jln beraspal dan pengembalian
kondisi)
79 MOF SNI ( S-10 )
- Pengad. / Pemas. Pipa PVC ø 1/2 "
- Pengad. / Pemas. Pipa PVC ø 3/4 "
- Pengad. / Pemas. Pipa PVC ø 1 "
- Pengad. / Pemas. Pipa PVC ø 1.5 "
- Pengad. / Pemas. Pipa PVC ø 2 "
- Pengad. / Pemas. Pipa PVC ø 2.5 "
- Pengad. / Pemas. Pipa PVC ø 3 "
- Pengad. / Pemas. Pipa PVC ø 4 "
- Pengad. / Pemas. Pipa PVC ø 6 "
- Pengad. / Pemas. Pipa PVC ø 8 "
- Pengad. / Pemas. Pipa PVC ø 10 "
- Pengad. / Pemas. Pipa PVC ø 12 "
80 RR SNI ( S-10 )
- Pengad./Pemas.Pipa PVC Ф 2"
- Pengad./Pemas.Pipa PVC Ф 2,5"
- Pengad./Pemas.Pipa PVC Ф 3"
- Pengad./Pemas.Pipa PVC Ф 4"
- Pengad./Pemas.Pipa PVC Ф 6"
- Pengad./Pemas.Pipa PVC Ф 8"
- Pengad./Pemas.Pipa PVC Ф 10"
- Pengad./Pemas.Pipa PVC Ф 12"
81 MOF SNI ( S-12.5 )
- Pengad./Pemas.Pipa PVC Ф 1/2"
- Pengad./Pemas.Pipa PVC Ф 3/4"
- Pengad./Pemas.Pipa PVC Ф 1"
- Pengad./Pemas.Pipa PVC Ф 1,5"
- Pengad./Pemas.Pipa PVC Ф 2"
- Pengad./Pemas.Pipa PVC Ф 2,5"
- Pengad./Pemas.Pipa PVC Ф 3"
- Pengad./Pemas.Pipa PVC Ф 4"
- Pengad./Pemas.Pipa PVC Ф 6"
- Pengad./Pemas.Pipa PVC Ф 8"
- Pengad./Pemas.Pipa PVC Ф 10"
- Pengad./Pemas.Pipa PVC Ф 12"
82 RR SNI ( S-12.5 )
- Pengad./Pemas.Pipa PVC Ф 2"
- Pengad./Pemas.Pipa PVC Ф 2,5"
- Pengad./Pemas.Pipa PVC Ф 3"
- Pengad./Pemas.Pipa PVC Ф 4"
- Pengad./Pemas.Pipa PVC Ф 6"
- Pengad./Pemas.Pipa PVC Ф 8"
- Pengad./Pemas.Pipa PVC Ф 10"
- Pengad./Pemas.Pipa PVC Ф 12"
83 GALVANIS
- Pengad./Pemas.Pipa PVC Ф 1/2"
- Pengad./Pemas.Pipa PVC Ф 3/4"
- Pengad./Pemas.Pipa PVC Ф 1"
- Pengad./Pemas.Pipa PVC Ф 1,5"
- Pengad./Pemas.Pipa PVC Ф 2"
- Pengad./Pemas.Pipa PVC Ф 2,5"
- Pengad./Pemas.Pipa PVC Ф 3"
- Pengad./Pemas.Pipa PVC Ф 4"
- Pengad./Pemas.Pipa PVC Ф 6"
- Pengad./Pemas.Pipa PVC Ф 8"
-
84 HDPE/PE ( PN.17 )
- Pengad. / Pemas. Pipa HDPE ø 1/2 "
- Pengad. / Pemas. Pipa HDPE ø 3/4 "
- Pengad. / Pemas. Pipa HDPE ø 1 "
- Pengad. / Pemas. Pipa HDPE ø 1.5 "
- Pengad. / Pemas. Pipa HDPE ø 2 "
- Pengad. / Pemas. Pipa HDPE ø 2.5 "
- Pengad. / Pemas. Pipa HDPE ø 3 "
- Pengad. / Pemas. Pipa HDPE ø 4 "
- Pengad. / Pemas. Pipa HDPE ø 6 "
- Pengad. / Pemas. Pipa HDPE ø 8 "
- Pengad. / Pemas. Pipa HDPE ø 10 "
- Pengad. / Pemas. Pipa HDPE ø 12 "
- Pengad. / Pemas. Pipa HDPE ø 14 "
- Pengad. / Pemas. Pipa HDPE ø 18 "
- Pengad. / Pemas. Pipa HDPE ø 20 "
- Pengad. / Pemas. Pipa HDPE ø 24 "
85 Pekerjaan Beban Pemeliharaan Aset Tetap Lainnya
- Rehabilitasi Ruang kelas Tingkat SMP
- Rehabilitasi Perpustakaan Tingkat SMP
- Rehabilitasi Ruang Lab. Komputer Tingkat SMP
- Rehabilitasi Ruang Ibadah Tingkat SMP
- Pemeliharaan CSSD
- Rehabilitasi Ruang Guru Tingkat SMP
- Rehabilitasi Lab. IPA Tingkat SMP
- Rehabilitasi Ruang Kelas Tingkat TK
86 Alat Pengeboran Mesin Lainnya
- Mata Bor Besi
87 Pekerjaan Persiapan
- Pek. Pemb. Direksi Keet Type 1
- Pek. Pemb. Direksi Keet Type 2
- Pek. Pemb. Direksi Keet Type 3
- Pek. Pemb. Bangsal Kerja Type 1
- Pek. Pemb. Bangsal Kerja Type 2
- Pek. Pemb. Bangsal Kerja Type 3
- Pek. Pengukuran dan Pemasangan Bouwplank Type 1
- Pek. Pengukuran dan Pemasangan Bouwplank Type 2
- Pek. Pengukuran dan Pemasangan Bouwplank Type 3
- Papan Nama Kegiatan Type 1
- Papan Nama Kegiatan Type 2
- Administrasi, Dokumentasi & Pelaporan Type 1
- Administrasi, Dokumentasi & Pelaporan Type 2
- Administrasi, Dokumentasi & Pelaporan Type 3
- Pek.Pembersihan Akhir Type 1
- Pek.Pembersihan Akhir Type 2
N JASA PEMERINTAH
AN 2021
M
HARGA SATUAN
SATUAN
(Rp)
4 5
Kg 9,900.00
Ton 13,644,000.00
Kg 13,644.00
Ton 9,900,000.00
Sak 70,000.00
Kg 1,418.00
Zak 70,875.00
Kg 22,823.00
Kg 36,000.00
Bh. 11,340.00
Buah 24,368.00
M2 46,940.00
Buah 184,500.00
Buah 175,500.00
Buah 175,500.00
Buah 175,500.00
Buah 166,500.00
Buah 166,500.00
M3 1,274,130.00
M3 202,500.00
M3 144,000.00
M3 181,530.00
M3 149,490.00
M3 795,330.00
M3 206,550.00
M3 193,320.00
M3 175,500.00
M3 404,337.00
M3 351,000.00
M3 155,520.00
KG 161,550.00
Kg 73,080.00
Kg 78,750.00
Kg 106,830.00
Liter 28,080.00
Kg 574,020.00
Liter 487,170.00
Kg 43,382.00
Kg 855,000.00
Kg 82,989.00
Kg 109,322.00
Kg 143,456.00
Kg 54,000.00
Kg 61,875.00
Kg 58,924.00
Kg 61,313.00
Kg 35,565.00
Kg 19,606.00
Kg 27,450.00
Kg 59,827.00
Kg 50,571.00
Kg 32,175.00
Kaleng 113,850.00
Kaleng 470,925.00
Lembar 68,466.00
Lembar 107,370.00
Lembar 42,581.00
Batang 4,448,880.00
Kg 128,880.00
Kg 128,880.00
Kg 128,880.00
Kg 128,880.00
Kg 128,880.00
Kg 128,880.00
Kg 128,880.00
Kg 1,254,780.00
Kg 6,177,600.00
Kg 128,880.00
Kg 128,880.00
Ton 59,149,350.00
Kg 18,990.00
Kg 25,515.00
Kg 23,445.00
Kg 33,548.00
Kg 36,383.00
Kg 15,300.00
Kg 18,000.00
Buah 26,229,870.00
Buah 74,232,090.00
Buah 61,148,520.00
Buah 43,743,330.00
M3 25,131,780.00
Kg 101,250.00
Buah 122,118,750.00
Dos 50,963.00
Dos 59,400.00
Dos 72,563.00
Dos 73,339.00
Dos 69,188.00
Dos 74,813.00
Dos 108,000.00
Dos 92,375.00
Dos 247,500.00
Dos 751,500.00
Dos 1,080,000.00
Dos 1,215,000.00
M2 189,000.00
M2 234,000.00
Buah 144,000.00
Dos 93,375.00
Buah 55,376.00
M2 26,391.00
Meter 84,533.00
Buah 2,432.00
M 144,720.00
Buah 92,430.00
Kg 100,201.00
Bh 255,150.00
Bh 297,000.00
Buah 41,670.00
M 77,220.00
M 96,480.00
Batang 77,220.00
Kg 544,860.00
Buah 53,280.00
Unit 12,153,780.00
Buah 1,503,180.00
Buah 1,576,170.00
Buah 35,486,640.00
Buah 22,500.00
Kg 22,500.00
Lembar 315,000.00
M3 16,170,750.00
Buah 1,211,310.00
Set 1,289,160.00
Lembar 11,520.00
Batang 2,707,290.00
Buah 30,060.00
Kg 55,525,230.00
Buah 75,965,130.00
Rol 97,684,740.00
Buah 179,109,450.00
Gulung 780,750.00
M3 79,380.00
M3 54,000.00
M3 36,000.00
M3 54,000.00
M3 274,754.00
M3 172,463.00
M3 172,463.00
M3 288,176.00
Kg 153.00
M3 149,670.00
M3 456,237.00
M3 67,815.00
Bh 67,500.00
Bh 90,000.00
Kg 1,612.00
Kg 103,950.00
Kg 1,712.00
Liter 5,614.00
Kg 91,684.00
Kg 117,880.00
Kg 85,500.00
M3 301,419.00
M3 324,846.00
M3 220,643.00
M3 235,602.00
M3 217,142.00
M3 194,002.00
M3 245,940.00
M2 10,980.00
M3 178,766.00
M3 253,204.00
M3 220,643.00
M3 194,594.00
M2 6,750.00
M3 74,420.00
Kg 84,150.00
Kg 28,800.00
Buah 2,700.00
Buah 3,780.00
Buah 2,475.00
Buah 3,600.00
Buah 3,223.00
Buah 4,005.00
Buah 2,925.00
Buah 3,825.00
Buah 6,750.00
Buah 6,300.00
Buah 94,500.00
Buah 70,875.00
Buah 495,000.00
Buah 405,000.00
Buah 378,000.00
Buah 342,000.00
Buah 283,500.00
Buah 3,600,000.00
Buah 2,700,000.00
Buah 1,350,000.00
Unit 990,000.00
Unit 1,138,500.00
M3 1,372,945.00
M3 1,434,934.00
M3 1,449,225.00
M3 1,481,090.00
M3 1,658,906.00
M3 1,891,794.00
M3 1,994,078.00
M3 2,147,310.00
M3 2,190,923.00
M3 380,428.00
M3 336,624.00
M3 215,262.00
Meter 558,000.00
Meter 601,200.00
Meter 621,000.00
Meter 664,200.00
Meter 672,300.00
Meter 725,400.00
Meter 666,000.00
Meter 715,500.00
Meter 743,400.00
Meter 792,000.00
Meter 823,500.00
Meter 882,000.00
Meter 837,000.00
Meter 899,100.00
Meter 915,300.00
Meter 977,400.00
Meter 1,015,200.00
Meter 1,091,700.00
Meter 7,982,697.00
Meter 8,224,666.00
Meter 8,572,099.00
Meter 9,076,536.00
Buah 3,406,500.00
Buah 2,641,500.00
Buah 535,500.00
Buah 346,500.00
Buah 2,682,000.00
Meter 7,618,824.00
Meter 7,626,237.00
Meter 7,625,411.00
Buah 2,740,500.00
Buah 2,443,500.00
Buah 535,500.00
Buah 454,500.00
Buah 1,962,000.00
Buah 1,017,900.00
Buah 1,281,600.00
Buah 1,393,200.00
Buah 2,552,400.00
Buah 3,061,800.00
Buah 379,800.00
Buah 554,400.00
Buah 898,200.00
Buah 5,258.00
Buah 810.00
M3 540,000.00
Buah 31,500.00
Lembar 68,466.00
Lembar 53,051.00
Lbr 65,430.00
Lbr 107,190.00
Lbr 173,340.00
Lbr 225,000.00
Lembar 97,418.00
Mtr 5,440.00
Lembar 63,807.00
Lembar 107,118.00
Lembar 130,379.00
Lembar 183,150.00
Galon 181,125.00
Liter 33,120.00
Lembar 78,750.00
Lembar 67,760.00
Lembar 75,375.00
Lembar 103,771.00
Lembar 237,722.00
Lembar 237,722.00
Kaki 25,481.00
M2 79,173.00
M2 104,553.00
M'' 18,854.00
M'' 24,310.00
M'' 39,690.00
Buah 4,230.00
Lembar 30,249.00
M1 36,617.00
M1 28,125.00
M1 11,016.00
Kg 65,008.00
Kg 43,514.00
Lbr 53,031.00
Lbr 42,516.00
Buah 26,539.00
Buah 34,429.00
Buah 38,833.00
Buah 47,678.00
Buah 22,128.00
Buah 30,335.00
Buah 43,278.00
Kg 18,302.00
Kg 64,622.00
Kg 22,500.00
Kg 17,401.00
Kg 41,251.00
Kg 18,900.00
Kg 23,251.00
Kg 28,501.00
Kg 25,425.00
Kg 28,575.00
Kg 28,575.00
M 466,557.00
M 66,482.00
M1 24,310.00
M2 13,272.00
M3 11,015.00
Kg 256,016.00
BH 3,987.00
Bks 14,850.00
Btng 18,754.00
Btng 72,000.00
Btng 94,500.00
Btng 103,500.00
Btng 103,500.00
Btng 193,500.00
Dos 99,000.00
Kg 33,750.00
Kg 360,000.00
Tabung 270,000.00
PCS 29,101.00
M'' 174,938.00
Bh 1,926.00
Tube 26,366.00
M'' 47,439.00
Kg 77,625.00
Kg 21,311.00
Kg 21,311.00
Btg 54,090.00
Kg 22,680.00
Kg 25,027.00
Bh 900,000.00
Bh 1,170,000.00
Bh 754,200.00
M'' 43,200.00
M2 23,850.00
M2 25,875.00
M'' 22,724.00
M3 978,282.00
M' 342,347.73
Dos 103,950.00
Kg 11,700.00
Kg 60,513.00
Kg 43,518.00
Kg 35,462.00
Ltr 69,001.00
Kg 38,579.00
Buah 14,288.00
Buah 37,225.00
M 11,073.00
Lbr 12,741.00
Liter 17,100.00
M3 150,000.00
Meter 10,620.00
roll 61,830.00
Kg 28,890.00
Kg 158,040.00
Roll 750,000.00
Batang 2,974,860.00
M 16,830.00
M3 8,377,200.00
M3 45,695,610.00
M3 9,310,050.00
M3 22,001,310.00
Batang 28,435,050.00
Batang 29,196,450.00
Batang 20,057,760.00
Batang 22,847,760.00
Batang 9,595,890.00
Batang 10,814,580.00
Batang 3,707,010.00
Batang 277,290.00
M3 51,030.00
M3 5,651,100.00
M3 3,780,000.00
M3 3,024,000.00
M3 1,620,000.00
M3 3,803,625.00
M3 3,780,000.00
M3 3,780,000.00
M3 3,024,000.00
M3 5,651,100.00
M3 3,780,000.00
M3 3,307,500.00
M3 1,984,500.00
M3 3,780,000.00
Mtr 72,000.00
Mtr 127,405.00
Btng 8,411.00
M3 1,440,000.00
Buah 15,750.00
Buah 16,830.00
Buah 21,833,460.00
Kg 69,480.00
Kg 1,471,590.00
Set 1,471,590.00
Kg 1,196,730.00
Kg 28,890.00
buah 5,000.00
buah 15,000.00
Tabung 135,000.00
Tabung 72,000.00
Tabung 500,000.00
Tabung 650,000.00
Tabung 80,000.00
Tabung 165,000.00
Tabung 35,000.00
Buah 23,366.00
Kg 101,250.00
Buah 36,515.00
Buah 37,657.00
Buah 40,509.00
Buah 42,792.00
Buah 31,951.00
Buah 29,669.00
Buah 26,626.00
Buah 62,489.00
Batang 289,530.00
M 1,306,530.00
Batang 95,580.00
M'' 28,125.00
M'' 39,375.00
M'' 50,625.00
M'' 84,375.00
M'' 107,100.00
M'' 156,263.00
M'' 220,050.00
M'' 364,613.00
M'' 810,225.00
M'' 1,359,675.00
M'' 2,102,400.00
M'' 2,964,375.00
M'' 20,250.00
M'' 25,875.00
M'' 36,000.00
M'' 61,875.00
M'' 78,750.00
M'' 112,500.00
M'' 151,875.00
M'' 247,500.00
M'' 302,400.00
M'' 472,500.00
M'' 743,715.00
M'' 1,186,920.00
M'' 26,213.00
M'' 35,663.00
M'' 10,817.00
M'' 22,770.00
M'' 36,432.00
M'' 156,263.00
M'' 220,050.00
M'' 364,613.00
M'' 810,225.00
M'' 1,359,675.00
M'' 2,102,400.00
M'' 2,964,375.00
M'' 20,250.00
M'' 25,875.00
M'' 36,000.00
M'' 61,875.00
M'' 78,750.00
M'' 112,500.00
M'' 115,830.00
M'' 159,390.00
M'' 364,320.00
M'' 569,250.00
M'' 895,950.00
M'' 75,263.00
Buah 8,499.00
Buah 4,575,881.00
Buah 2,001,870.00
Buah 1,601,509.00
Buah 726,534.00
Buah 660,813.00
Buah 91,734.00
Buah 35,861.00
Buah 34,619.00
Buah 33,182.00
Buah 30,057.00
Buah 28,683.00
Buah 13,248.00
Buah 12,873.00
Buah 5,605,310.00
Buah 1,124,100.00
Buah 610,509.00
Buah 130,104.00
Buah 74,425.00
Buah 43,187.00
Buah 31,683.00
Buah 19,054.00
Buah 10,624.00
Buah 5,725.00
Buah 4,600.00
Buah 551,250.00
Buah 270,000.00
Buah 66,938.00
Buah 37,688.00
Buah 24,750.00
Buah 17,438.00
Buah 11,813.00
Buah 7,313.00
Buah 5,625.00
Buah 4,500.00
Batang 545,000.00
Buah 8,100.00
Buah 10,800.00
Btng 146,475.00
M' 47,014.88
Btng 290,115.00
Btng 425,250.00
M' 88,673.63
Btng 390,375.00
M' 136,878.75
Btng 859,950.00
M' 182,108.25
Btng 1,134,000.00
Btng 1,417,500.00
Btng 1,197,000.00
Btng 2,835,000.00
Btng 5,670,000.00
M'' 37,800.00
M'' 47,250.00
M'' 75,600.00
M'' 147,600.00
M'' 160,650.00
M'' 189,000.00
M'' 236,250.00
M'' 378,000.00
M'' 472,500.00
M'' 945,000.00
Buah 38,493.00
Buah 52,241.00
Buah 59,114.00
Buah 82,485.00
Buah 97,606.00
Buah 87,984.00
Buah 105,856.00
Buah 120,978.00
Buah 164,970.00
Buah 177,342.00
Buah 193,839.00
Buah 214,460.00
Buah 270,824.00
Buah 306,567.00
Buah 352,872.00
Buah 387,649.00
buah 703,800.00
buah 1,407,600.00
Buah 1,024,806.00
Buah 1,124,787.00
Buah 1,162,279.00
Buah 2,124,597.00
Buah 2,187,085.00
Buah 2,437,038.00
Buah 3,749,288.00
Buah 3,999,240.00
Buah 4,124,217.00
Buah 4,624,122.00
Buah 5,249,003.00
Buah 5,498,955.00
Buah 5,623,932.00
Buah 5,498,955.00
Buah 5,998,860.00
Buah 6,498,765.00
Buah 5,748,908.00
Buah 6,248,813.00
Buah 6,748,718.00
Buah 15,247,103.00
Buah 30,870.00
Buah 113,041.00
Buah 205,524.00
Buah 719,364.00
Buah 1,233,142.00
Buah 2,466,282.00
Buah 4,624,308.00
Buah 29,870.00
Buah 82,235.00
Buah 164,469.00
Buah 513,840.00
Buah 924,887.00
Buah 1,849,711.00
Buah 3,699,423.00
Buah 26,746.00
Buah 71,987.00
Buah 143,910.00
Buah 349,434.00
Buah 822,095.00
Buah 1,644,188.00
Buah 2,671,805.00
Buah 607,765.00
Buah 871,218.00
Buah 1,143,800.00
Buah 1,482,740.00
Buah 1,738,826.00
Buah 5,548,946.00
Buah 8,805,827.00
Buah 14,233,546.00
Buah 3,875.00
Buah 5,875.00
Buah 6,499.00
Buah 12,249.00
Buah 15,997.00
Buah 36,369.00
Buah 94,233.00
Buah 226,582.00
Buah 3,875.00
Buah 5,871.00
Buah 6,499.00
Buah 12,249.00
Buah 22,122.00
Buah 35,120.00
Buah 64,241.00
Buah 259,951.00
Buah 554,395.00
Buah 1,787,161.00
Buah 3,663.00
Buah 4,832.00
Buah 6,407.00
Buah 6,407.00
Buah 19,559.00
Buah 36,056.00
Buah 30,870.00
Buah 77,111.00
Buah 113,041.00
Buah 92,035.00
Buah 303,193.00
Buah 590,950.00
Buah 822,095.00
Buah 1,695,616.00
Buah 1,438,665.00
Buah 1,086,077.00
Buah 289,758.00
Buah 259,726.00
Buah 168,956.00
Buah 174,717.00
Buah 349,434.00
Buah 369,992.00
Buah 616,571.00
Buah 647,440.00
Buah 955,694.00
Buah 1,079,046.00
Buah 2,024,429.00
Buah 2,229,952.00
Buah 937,323.00
Buah 1,374,740.00
Buah 1,793,410.00
Buah 2,124,597.00
Buah 2,499,525.00
Buah 3,061,918.00
Buah 4,061,728.00
Buah 284,947.00
Buah 374,930.00
Buah 547,397.00
Buah 877,334.00
Buah 1,349,744.00
Buah 1,949,630.00
Buah 3,899,259.00
Buah 725,535.00
Buah 876,645.00
Buah 1,130,220.00
Buah 1,287,540.00
Buah 1,519,380.00
Buah 1,689,804.00
Buah 2,592,758.00
Buah 413,797.00
Buah 505,904.00
Buah 574,641.00
Buah 1,218,019.00
Buah 1,563,079.00
Buah 1,975,500.00
Buah 4,135,214.00
Buah 5,053,540.00
Buah 5,973,240.00
Buah 10,107,080.00
Buah 12,863,431.00
Buah 227,700.00
Buah 291,870.00
Buah 389,160.00
Buah 736,920.00
Buah 1,165,410.00
Buah 7,260,525.00
Buah 363,026.25
Buah 14,835.00
Lembar 143,777.00
Buah 330,144.30
M'' 8,124.00
M'' 10,624.00
M'' 16,248.00
M'' 38,994.00
M'' 61,740.00
M'' 86,985.00
M'' 125,102.00
M'' 186,090.00
M'' 368,806.00
M'' 575,892.00
M'' 983,565.00
M'' 1,424,605.00
M' 9,341.91
M' 12,216.11
M' 18,684.86
M' 44,841.38
M' 70,999.97
M' 100,030.68
M' 143,866.04
M' 214,002.81
M' 424,126.44
M' 662,273.73
M' 1,131,097.68
M' 1,638,295.29
M' 1,985,563.67
M' 2,509,397.87
M' 3,179,282.99
M' 3,915,827.28
M' 4,920,928.20
M' 6,217,032.83
M' 9,341.91
M' 12,216.11
M' 100,030.68
M' 143,866.04
M' 214,002.81
M' 10,805,230.26
M' 13,700,395.91
M' 18,519,666.41
M' 22,811,999.27
M' 27,538,698.33
M' 7,400.25
M' 9,677.25
M' 12,637.35
M' 28,422.65
M' 45,329.38
M' 69,676.20
M' 100,068.46
M' 143,314.38
M' 213,798.92
M' 263,756.30
M' 329,874.68
M' 433,085.40
M' 544,601.48
M' 674,612.48
M' 851,415.84
M' 1,043,691.41
M' 1,317,847.91
M' 1,656,711.05
M' 2,138,865.80
M' 2,681,247.20
M' 3,430,653.44
M' 4,230,324.45
M' 5,302,762.99
M' 6,689,723.54
M' 8,807,845.86
M' 11,163,590.21
M' 15,043,723.45
M' 18,586,382.51
M' 22,913,758.40
buah 53,492.94
buah 84,236.58
buah 118,384.34
buah 187,816.28
buah 333,321.75
buah 660,966.53
buah 1,110,961.76
buah 2,164,636.26
buah 4,120,586.51
Buah 35,732.00
Buah 55,803.00
Buah 83,961.00
Buah 128,003.00
Buah 214,224.00
Buah 909,965.00
Buah 1,620,155.00
Buah 2,854,946.00
Buah 5,922,213.00
Buah 76,049.00
Buah 119,765.00
Buah 168,269.00
Buah 259,827.00
Buah 458,776.00
Buah 1,053,650.00
Buah 1,690,605.00
Buah 3,074,517.00
Buah 8,399,704.00
Buah 22,422.00
Buah 36,144.00
Buah 38,081.00
Buah 88,759.00
Buah 113,379.00
Buah 236,744.00
Buah 347,059.00
Buah 1,627,067.00
Buah 70,381.04
Buah 111,557.48
Buah 158,224.59
Buah 228,051.90
Buah 358,745.49
Buah 714,273.17
Buah 1,204,684.11
Buah 1,882,148.54
Buah 3,485,993.85
Buah 3,659,822.10
Buah 4,181,760.00
Buah 5,292,540.00
Buah 6,534,000.00
Buah 8,196,249.60
Buah 12,966,723.00
Buah 16,468,947.00
Buah 27,878,400.00
Buah 76,486.00
Buah 76,486.00
Buah 99,807.00
Buah 100,070.00
Buah 121,578.00
Buah 121,765.00
Buah 126,364.00
Buah 187,278.00
Buah 187,278.00
Buah 196,951.00
Buah 197,088.00
Buah 200,388.00
Buah 201,075.00
Buah 247,454.00
Buah 248,641.00
Buah 247,716.00
Buah 248,116.00
Buah 364,451.00
Buah 365,132.00
Buah 364,944.00
Buah 1,157,756.00
Buah 211,485.00
Buah 250,091.00
Buah 270,050.00
Buah 347,585.00
Buah 537,473.00
Buah 1,487,518.00
Buah 2,102,526.00
Buah 3,006,229.00
Buah 4,462,903.00
Buah 61,202.00
Buah 97,007.00
Buah 137,587.00
Buah 198,307.00
Buah 311,954.00
Buah 621,108.00
Buah 1,047,552.00
Buah 1,636,652.00
Buah 3,031,300.00
Buah 139,237.00
Buah 139,237.00
Buah 278,472.00
Buah 278,472.00
Buah 361,944.00
Buah 361,944.00
Buah 866,087.00
Buah 989,812.00
Buah 1,237,266.00
Buah 1,484,719.00
Buah 1,484,719.00
Buah 1,732,172.00
Buah 1,732,172.00
Buah 46,517.00
Buah 73,250.00
Buah 102,943.00
Buah 163,320.00
Buah 289,845.00
Buah 574,755.00
Buah 966,054.00
Buah 1,882,294.00
Buah 3,583,119.00
Buah 48,355.00
Buah 65,938.00
Buah 83,736.00
Buah 147,997.00
Buah 179,029.00
Buah 234,093.00
Buah 386,815.00
Buah 779,291.00
Buah 1,584,312.00
Buah 37,560.15
Buah 50,342.40
Buah 52,702.20
Buah 98,325.00
Buah 136,278.45
Buah 149,650.65
Buah 233,816.85
Buah 21,434.85
Buah 26,547.75
Buah 35,790.30
Buah 67,450.95
Buah 95,571.90
Buah 150,043.95
Buah 265,084.20
Buah 311,296.95
Buah 698,500.80
Buah 66,914.00
Buah 88,859.00
Buah 114,879.00
Buah 229,320.00
Buah 242,730.00
Buah 346,172.00
Buah 663,862.00
Buah 1,058,025.00
Buah 2,407,056.00
Buah 45,829.00
Buah 62,551.00
Buah 71,963.00
Buah 143,674.00
Buah 149,972.00
Buah 149,972.00
Buah 413,523.00
Buah 640,216.00
Buah 1,626,342.00
Buah 49,742.00
Buah 60,589.00
Buah 72,900.00
Buah 124,178.00
Buah 151,035.00
Buah 154,334.00
Buah 215,510.00
Buah 210,848.00
Buah 268,500.00
Buah 239,893.00
Buah 292,658.00
Buah 322,727.00
Buah 499,494.00
Buah 557,532.00
Buah 1,698,615.00
Buah 20,606.85
Buah 20,627.55
Buah 22,531.95
Buah 22,552.65
Buah 23,432.40
Buah 29,549.25
Buah 29,601.00
Buah 60,061.05
Buah 81,061.20
Buah 93,512.25
Buah 194,455.80
Buah 294,716.25
Buah 951,061.50
Buah 21,424.50
Buah 21,590.10
Buah 23,194.35
Buah 23,297.85
Buah 25,409.25
Buah 34,196.40
Buah 34,279.20
Buah 68,423.85
Buah 106,387.65
Buah 150,675.30
Buah 217,608.75
Buah 315,902.70
Buah 1,119,093.75
Buah 57,091.64
Buah 57,242.75
Buah 65,058.03
Buah 65,058.03
Buah 88,547.36
Buah 88,697.43
Buah 259,042.91
Buah 366,630.12
Buah 868,125.92
Buah 1,004,019.35
Buah 2,655,817.25
Buah 55,816.00
Buah 55,890.00
Buah 62,064.00
Buah 62,064.00
Buah 62,001.00
Buah 85,384.00
Buah 85,235.00
Buah 159,858.00
Buah 212,898.00
Buah 360,932.00
Buah 792,638.00
Buah 915,664.00
Buah 921,626.00
Buah 2,428,752.00
Buah 52,128.00
Buah 52,266.00
Buah 59,401.00
Buah 59,401.00
Buah 80,848.00
Buah 80,985.00
Buah 236,519.00
Buah 334,750.00
Buah 792,638.00
Buah 916,714.00
Buah 2,424,878.00
Buah 14,355.45
Buah 18,681.75
Buah 49,752.45
Buah 80,823.15
Buah 81,019.80
Buah 130,968.90
Buah 236,963.25
Buah 250,925.40
Buah 460,057.50
Buah 97,945.00
Buah 108,617.00
Buah 130,326.00
Buah 265,588.00
Buah 300,932.00
Buah 300,932.00
Buah 326,014.00
Buah 374,167.00
Buah 374,167.00
Buah 400,913.00
Buah 935,424.00
Buah 993,887.00
Buah 1,032,255.00
Buah 1,271,609.00
Buah 2,627,989.00
Buah 2,630,889.00
Buah 3,025,520.28
Buah 1,218,220.88
Buah 44,485.34
Buah 58,858.38
Hari 465,750.00
Buah 463,654.62
Buah 216,542.70
Buah 431,491.50
Buah 1,221,610.50
Buah 193,545.00
Buah 525,987.00
Buah 603,900.00
Buah 3,031,300.80
Buah 2,639,043.00
Buah 1,527,867.00
Buah 222,007.50
Buah 229,123.62
Buah 301,702.50
Buah 398,475.00
Buah 2,639,043.00
Buah 3,031,300.80
Buah 3,187,800.00
Buah 2,852,033.58
Buah 1,858,784.40
Buah 227,985.12
Buah 24,057.00
Buah 33,165.00
Buah 198,247.50
Buah 19,503.00
Buah 33,165.00
Buah 185,922.99
Buah 246,490.20
Buah 542,211.12
Buah 55,587.51
Buah 25,701.39
Buah 29,288.16
Buah 24,309.45
Buah 280,356.12
Buah 53,188.74
Buah 347,242.50
Buah 63,513.45
Buah 9,900.00
Buah 9,900.00
Buah 14,850.00
Buah 8,910.00
Buah 31,680.00
Buah 16,318.17
Buah 675,000.00
Unit 2,745,000.00
Buah 7,650,000.00
Buah 2,250,000.00
Buah 765,000.00
hari 731,250.00
Unit 40,000,000.00
Buah 486,000.00
Buah 405,000.00
Buah 60,750.00
Buah 74,250.00
Meter 6,075.00
Meter 76,500.00
Buah 202,500.00
Buah 108,000.00
Buah 180,000.00
Kg 96,480.00
Buah 81,900.00
Besar 70,200.00
Buah 152,100.00
Buah 157,500.00
Kecil 5,382.00
Unit 450,000.00
Unit 2,525,000.00
Buah 643,500.00
Set 3,860,000.00
Buah 909,091.00
Buah 909,091.00
Buah 909,091.00
Buah 909,091.00
Buah 909,091.00
Buah 909,091.00
Buah 909,091.00
Buah 909,091.00
Buah 909,091.00
Buah 909,091.00
Buah 1,500,000.00
Buah 3,000,000.00
Tahun 18,000,000.00
Buah 4,825,000.00
Buah 220,000.00
Buah 550,000.00
Buah 550,000.00
Roll 5,000,000.00
Buah 2,000,000.00
Buah 2,000,000.00
Roll 6,000,000.00
Buah 550,000.00
Buah 800,000.00
Roll 920,248.00
Btg 7,934.00
Btg 11,955.00
Roll 1,412,775.00
Btg 27,712.00
Btg 37,494.00
Roll 278,208.00
Roll 686,773.00
Batang 96,480.00
Buah 328,950.00
Batang 649,440.00
Buah 7,129,620.00
Buah 7,129,620.00
Buah 9,126,000.00
KG 161,550.00
M2 4,252,500.00
M2 4,725,000.00
M2 4,177,233.00
M2 4,973,715.00
M2 5,811,750.00
M2 5,671,969.00
M2 5,953,095.00
M2 3,591,000.00
M2 7,087,500.00
M2 3,780,000.00
Unit 11,700,000.00
Ruang 90,123,300.00
Ruang 187,795,800.00
Ruang 70,358,850.00
Ruang 120,876,300.00
Ruang 202,500,000.00
Ruang 180,396,900.00
M2 1,275,750.00
M2 2,079,000.00
M2 2,031,750.00
M2 1,228,500.00
M2 1,181,250.00
M2 1,890,000.00
M2 1,417,500.00
M2 2,220,750.00
M2 1,417,500.00
M2 2,220,750.00
Unit 29,700,000.00
Unit 5,940,000.00
Unit 1,287,000.00
Paket 9,000,000.00
Paket 24,300,000.00
M2 97,601.00
M'' 97,425.00
M'' 83,763.00
M2 109,044.00
M2 356,962.00
M2 63,845.00
M2 102,610.00
M2 102,258.00
M2 52,450.00
M2 249,112.00
M2 49,905.00
M'' 18,159.00
M2 261,643.00
M2 192,145.00
M'' 84,074.00
M2 133,257.00
M2 235,463.00
M3 8,439,650.00
M3 11,366,091.00
M3 8,492,931.00
M2 700,173.00
M2 195,978.00
M2 179,667.00
M2 225,000.00
M2 107,465.00
M'' 95,241.00
M'' 70,122.00
M 219,238.80
Kg 40,567.23
M 206,860.50
Cm 5,415.20
M'' 77,367.00
M2 179,875.00
M2 195,932.00
M2 46,977.00
M2 73,756.00
M'' 77,367.00
M2 146,056.00
M'' 87,800.00
M2 42,208.00
M2 253,084.00
M2 35,958.00
M2 171,897.00
M2 194,666.00
M2 221,180.00
M2 34,471.00
M2 226,899.00
Buah 211,590.00
M2 42,322.00
M2 28,918.00
M2 19,987.00
M2 14,108.00
M2 478,618.00
M2 164,902.00
M2 164,902.00
M'' 31,342.00
M2 188,523.00
M2 198,804.00
M2 171,897.00
M2 164,902.00
Buah 45,000.00
M'' 13,500.00
M2 238,863.00
Mtr 1,800,000.00
Mtr 450,000.00
Mtr 450,000.00
M3 8,091,372.00
M2 353,163.00
M2 320,043.00
M2 770,765.00
M2 565,028.00
M2 597,655.00
M2 651,424.00
M2 628,008.00
M3 10,444,445.00
Buah 1,933,740.00
Tahun 3,690,000.00
Buah 1,430,000.00
Unit 5,500,000.00
Unit 19,802,340.00
Buah 3,283,740.00
Buah 4,157,100.00
Buah 5,971,500.00
Buah 7,471,620.00
Buah 9,971,820.00
Buah 11,718,720.00
Buah 13,367,520.00
Buah 17,849,970.00
Buah 19,024,920.00
Buah 22,350,286.80
Buah 357,500.00
Buah 572,000.00
Buah 357,500.00
Unit 357,500.00
Buah 2,860,000.00
Meter 21,450.00
Titik 225,000.00
Buah 1,350,000.00
Mtr 67,500.00
Mtr 67,500.00
Buah 154,800.00
unit 13,500,000.00
Buah 3,150,000.00
M2 162,112.50
Ls 13,500,000.00
Huruf 3,150,000.00
Huruf 2,250,000.00
Rp/kWh 1,277.10
Rp/kWh 1,364.40
Rp/kWh 1,364.40
Rp/kWh 1,364.40
Rp/kWh 1,364.40
Rp/kWh 1,364.40
Rp/kWh 1,053.00
Rp/kWh 1,053.00
Rp/kWh 1,364.40
Rp/kWh 1,553.40
M2 564,510.38
M2 576,390.38
M 90,700.50
M 385,060.50
Kg 40,567.23
Kg 40,567.23
Kg 40,567.23
Bh 1,350,000.00
M 67,500.00
M2 974,085.75
bh 1,176,238.80
cm 5,415.20
m3 79,100.00
m3 79,100.00
m3 105,630.00
m3 56,920.00
meter 202,140.00
LS 4,000,000.00
m3 1,287,900.00
kg 20,970.00
m2 183,560.00
LS 12,975,000.00
Buah 27,850,608.00
Buah 38,684,574.00
Buah 55,352,214.00
Buah 2,515,500.00
M2 147,019.00
M2 136,039.00
M2 133,538.00
M2 70,384.00
M2 67,092.00
M2 64,821.00
M2 63,566.00
M2 99,798.00
M'' 68,182.00
M2 57,500.00
M2 38,005.00
M3 243,316.00
M3 683,328.00
M3 3,211,808.00
M1 2,457,618.00
set 211,038,750.00
M1 32,746.00
M1 750,067.00
M1 253,342.00
M1 601,103.00
M1 912,119.00
M1 3,539,356.00
M1 996,519.00
M1 1,372,623.00
M1 1,751,930.00
M1 1,375,033.00
M1 1,365,149.00
M1 2,455,294.00
M2 38,340.00
M2 62,100.00
M2 77,850.00
M2 81,180.00
M2 8,730.00
M2 5,940.00
M2 67,320.00
M2 16,605.00
M2 8,370.00
M1 50,940.00
M3 60,000.00
M3 60,000.00
M2 4,000.00
M3 81,460.00
Meter 24,120.00
M3 68,828.00
M3 84,302.00
M3 100,002.00
M3 91,619.00
M3 138,794.00
M2 110,694.00
M3 29,620.00
M3 28,388.00
M3 22,956.00
M3 357,785.00
M3 768,364.00
M3 116,121.00
M3 601,125.00
M3 27,138.00
M3 400,229.00
M3 72,477.00
M3 49,680.00
M3 208,800.00
M3 12,093.00
M3 201,404.00
M3 109,830.00
M2 1,901.00
buah 311,805.00
buah 32,372.00
M2 214,156.00
M2 247,183.00
buah 177,237.00
M3 1,263,119.00
M3 438,071.00
M3 541,152.00
M3 510,920.00
M3 556,551.00
M3 538,830.00
M3 1,700,490.00
M3 2,072,881.00
M3 1,664,802.00
M3 757,078.00
M3 1,190,086.00
M3 1,245,510.00
M3 4,425,414.00
M3 1,151,661.00
Liter 15,727.00
Liter 14,202.00
Ton 1,132,649.00
Ton 1,436,951.00
Ton 1,393,340.00
M3 1,972,324.00
M3 1,353,510.00
Ton 1,011,251.00
Kg 122,364.00
M3 241,569.00
M3 1,039,865.00
M3 1,114,039.00
M3 1,199,616.00
M3 1,240,847.00
M3 1,370,012.00
M3 1,068,991.00
M3 1,289,814.00
M3 1,626,680.00
M3 1,713,711.00
M3 1,971,420.00
M3 1,976,301.00
M3 2,041,898.00
M3 2,106,901.00
M3 2,164,081.00
M2 368,150.00
M2 414,011.00
M2 401,591.00
M3 1,221,912.00
M1 8,594,287.00
M1 177,727.00
M1 177,727.00
M1 945,313.00
M1 736,349.00
Kg 21,949.00
Kg 20,909.00
Buah 572,988.00
Buah 1,365,867.00
Kg 514,211.00
Buah 231,965,910.00
Buah 140,056,254.00
Buah 15,230,729.00
Buah 13,606,119.00
M3 977,605.00
M3 724,779.00
M3 390,231.00
M1 711,318.00
M3 1,719,822.00
M3 264,978.00
M1 1,244,952.00
M1 1,073,295.00
M1 1,239,944.00
M1 1,938,888.00
M3 2,276,125.00
M1 3,732,858.00
Buah 11,880,598.00
Buah 881,595.00
Buah 1,112,265.00
M1 266,187.00
Buah 2,031,975.00
Buah 1,830,244.00
Buah 10,812,323.00
M1 99,665.00
M3 450,000.00
M1 361,353.00
M2 120,005.00
M3 490,271.00
M3 345,571.00
Buah 1,608,750.00
Buah 643,500.00
M2 103,410.00
Hari (7 jam) 90,000.00
Jam 12,858.00
Hari (7 jam) 108,000.00
Jam 15,429.00
Hari (7 jam) 117,000.00
Jam 16,715.00
Hari (7 jam) 117,000.00
Jam 16,715.00
Hari (7 jam) 117,000.00
Jam 16,715.00
Hari (7 jam) 117,000.00
Jam 16,715.00
Hari (7 jam) 117,000.00
Jam 16,715.00
Hari (7 jam) 117,000.00
Jam 16,715.00
Hari (7 jam) 117,000.00
Jam 16,715.00
Hari (7 jam) 135,000.00
Jam 19,287.00
Hari (7 jam) 99,000.00
Jam 14,144.00
Org/Jam 225,000.00
Jam 32,144.00
Org/Jam 108,000.00
Jam 15,429.00
Org/Jam 180,000.00
Jam 25,715.00
Org/Jam 108,000.00
Jam 15,429.00
Org/Jam 225,000.00
Jam 32,144.00
Org/Jam 135,000.00
Jam 19,287.00
M2 607,172.00
Buah 958,647.00
Buah 326,290.00
Buah 222,930.00
M1 569,148.00
Buah 42,075.00
Buah 42,075.00
Buah 42,075.00
Buah 42,075.00
Buah 139,076.00
Buah 135,990.00
M2 14,527.00
Ton 1,671,581.00
Ton 1,962,556.00
M3 354,510.00
M3 8,106,494.00
Buah 303,392.00
M1 751.00
M3 153,945.00
M3 172,485.00
M3 753,539.00
M3 238,478.00
M3 510,255.00
M2 6,030.00
M2 6,483.00
M3 2,646,450.00
M3 3,848,985.00
M3 1,258,106.00
M3 1,451,340.00
M3 848,655.00
M2 23,445.00
M1 455,513.00
Buah 13,365.00
Buah 13,365.00
M1 8,415.00
M2 855.00
M3 64,681.00
M3 155,211.00
M3 40,614.00
M3 166,987.00
M3 65,516.00
M3 37,913.00
M3 46,080.00
M3 323,739.00
M3 232,254.00
m3 800,866.00
M2 294,480.00
M2 303,750.00
M2 325,530.00
M2 297,090.00
Kg 26,280.00
Kg 25,110.00
M2 267,840.00
M2 254,970.00
M2 246,150.00
M2 241,740.00
M3 927,761.00
M3 1,117,102.00
M3 1,235,780.00
M3 1,192,931.00
M3 1,077,048.00
M3 1,195,725.00
M2 70,107.00
M2 69,059.00
m2 92,016.00
m2 90,353.00
m2 86,517.00
m2 88,722.00
m2 42,145.00
m2 42,338.00
m3 575,564.00
m3 677,826.00
m3 731,538.00
Buah 402,120.00
Meter 19,260.00
Buah 402,120.00
Unit 402,120.00
Buah 3,217,500.00
Buah 24,120.00
M3 872,100.00
M3 812,610.00
M3 778,950.00
M3 674,460.00
M3 787,320.00
M3 756,360.00
M3 488,160.00
M2 38,520.00
M2 125,190.00
M3 981,270.00
M3 68,760.00
M3 91,530.00
M3 138,780.00
M3 49,680.00
M3 208,800.00
M3 31,410.00
M3 41,850.00
M3 13,050.00
M3 75,870.00
M3 105,300.00
M3 198,000.00
M3 208,890.00
M3 76,140.00
M3 870,750.00
M3 810,450.00
M3 776,250.00
M3 671,400.00
M3 784,530.00
M3 753,120.00
M3 488,430.00
M2 37,530.00
M3 910,170.00
M3 950,130.00
M3 981,270.00
M3 840,330.00
M3 1,018,260.00
M3 1,053,270.00
M3 1,080,000.00
M3 1,097,010.00
M3 1,126,260.00
M3 1,135,350.00
M3 1,222,290.00
M3 1,234,260.00
Kg 20,430.00
M2 174,150.00
M2 184,500.00
m3 984,138.00
m3 1,030,303.00
m3 1,109,221.00
m3 1,294,046.00
m3 7,328,500.00
m3 1,215,241.00
m3 6,964,234.00
Buah 2,208,285.00
M3 202,499.00
M3 137,076.00
Buah 18,081,127.00
Buah 16,614,015.00
Buah 8,976,025.00
m3 78,300.00
M3 49,680.00
M3 30,171.00
M3 49,680.00
Unit 20,392,830.00
Unit 6,938,640.00
Unit 10,302,210.00
Unit 13,665,690.00
Unit 17,094,690.00
Unit 40,904,100.00
Unit 54,359,100.00
M3 687,600.00
M3 91,530.00
M3 138,780.00
Meter 17,910.00
Meter 15,030.00
Meter 1,219,410.00
Meter 627,660.00
M1 846,315.00
M1 1,648,440.00
M1 2,717,940.00
M1 21,382.00
M1 24,590.00
M1 26,997.00
M1 49,753.00
M1 68,868.00
M1 98,636.00
M1 130,721.00
M1 183,662.00
M1 355,316.00
M1 555,848.00
M1 828,570.00
M1 1,296,581.55
M1 884,081.55
M'' 797.00
M'' 796.00
M'' 796.00
Buah 11,787,615.00
Buah 7,292,610.00
Buah 4,595,400.00
Buah 2,615,445.00
Buah 6,089,837.00
Buah 3,045,488.00
Buah 7,292,610.00
Buah 1,138,500.00
Buah 1,485,225.00
Buah 704,609.00
Buah 310,500.00
Buah 726,570.00
Buah 1,614,600.00
Buah 776,250.00
Buah 425,541.00
Buah 1,531,853.00
Buah 726,570.00
Buah 1,614,600.00
Buah 1,008,711.00
Buah 3,424,608.00
Buah 76,643.00
Buah 93,617.00
Buah 52,136.00
Buah 96,666.00
Buah 42,909.00
Buah 42,909.00
Unit 73,341.00
Buah 144,000.00
M2 2,901,960.00
M2 3,439,620.00
M2 14,039,370.00
M2 20,557,170.00
M2 101,856,420.00
M2 75,268,260.00
M2 19,062,360.00
M2 5,926,320.00
M2 3,991,860.00
M2 134,460.00
M2 193,500.00
M2 37,530.00
Unit 76,847,040.00
Unit 104,161,770.00
Unit 125,555,670.00
Unit 146,949,480.00
Unit 163,427,220.00
Unit 196,757,370.00
Meter 20,070.00
Meter 22,230.00
Meter 23,850.00
Meter 35,280.00
Meter 48,240.00
Meter 62,370.00
Meter 86,220.00
Meter 124,110.00
Meter 242,460.00
Meter 378,270.00
Meter 563,040.00
Meter 918,270.00
Meter 67,860.00
Meter 93,960.00
Meter 126,450.00
Meter 169,740.00
Meter 367,380.00
Meter 563,040.00
Meter 870,840.00
Meter 1,413,900.00
Meter 19,440.00
Meter 20,790.00
Meter 21,150.00
Meter 30,330.00
Meter 37,980.00
Meter 48,870.00
Meter 64,980.00
Meter 91,980.00
Meter 178,830.00
Meter 272,340.00
Meter 501,300.00
Meter 728,640.00
Meter 100,800.00
Meter 111,690.00
Meter 144,270.00
Meter 187,740.00
Meter 242,100.00
Meter 274,680.00
Meter 329,040.00
Meter 1,666,620.00
Meter 1,153,260.00
Meter 679,230.00
Meter 434,430.00
Meter 220,590.00
Meter 149,490.00
Meter 105,660.00
Meter 76,680.00
Meter 50,490.00
Meter 24,390.00
Meter 421,470.00
Meter 683,010.00
Meter 45,810.00
Meter 54,810.00
Meter 75,330.00
Meter 111,060.00
Meter 231,570.00
Meter 291,870.00
Meter 452,430.00
M1 685,890.00
M1 445,253.00
M1 293,123.00
M1 100,613.00
Meter 23,130.00
Meter 25,830.00
Meter 26,550.00
Meter 40,860.00
Meter 57,330.00
Meter 75,060.00
Meter 96,750.00
Meter 139,590.00
Meter 276,750.00
Meter 429,750.00
Meter 659,160.00
Meter 1,068,390.00
Meter 81,990.00
Meter 81,990.00
Meter 154,800.00
Meter 200,880.00
Meter 457,650.00
Meter 704,070.00
Meter 1,092,780.00
Meter 1,768,140.00
Meter 21,060.00
Meter 25,380.00
Meter 26,550.00
Meter 39,510.00
Meter 51,840.00
Meter 66,870.00
Meter 89,460.00
Meter 124,380.00
Meter 289,260.00
Meter 361,800.00
Meter 559,710.00
Meter 895,500.00
Meter 60,030.00
Meter 63,000.00
Meter 85,410.00
Meter 119,970.00
Meter 293,400.00
Meter 360,450.00
Meter 563,130.00
Meter 911,250.00
Meter 111,420.00
Meter 125,100.00
Meter 159,300.00
Meter 214,740.00
Meter 266,760.00
Meter 319,770.00
Meter 396,810.00
Meter 556,650.00
Meter 865,890.00
Meter 1,313,910.00
Meter 16,380.00
Meter 19,710.00
Meter 27,180.00
Meter 57,240.00
Meter 87,300.00
Meter 120,690.00
Meter 171,090.00
Meter 252,720.00
Meter 497,970.00
Meter 778,500.00
Meter 1,322,910.00
Meter 1,912,320.00
Meter 2,232,360.00
Meter 3,557,070.00
Meter 4,379,400.00
Meter 6,923,970.00
Ruang 169,210,800.00
Ruang 282,014,100.00
Ruang 317,264,400.00
Ruang 45,000,000.00
Tahun 19,800,000.00
Ruang 282,009,600.00
Ruang 317,264,400.00
Ruang 102,250,800.00
Buah 46,260.00
Ls 6,750,000.00
Ls 9,000,000.00
Ls 18,000,000.00
Ls 2,700,000.00
Ls 5,400,000.00
Ls 9,000,000.00
Ls 2,250,000.00
Ls 4,500,000.00
Ls 9,000,000.00
Ls 315,000.00
Ls 450,000.00
Ls 3,600,000.00
Ls 7,200,000.00
Ls 10,800,000.00
Ls 4,500,000.00
Ls 9,000,000.00
Perhitungan Volume Bangunan
A PEKERJAAN PEMBERSIHAN
1 Pembersihan Sat Vkes V P L T J
Volume Keseluruhan Ls 1.000
2 Pembongkaran Sat Vkes V P L T J
Volume Keseluruhan Ls 1.000
B PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Tanah 2m Sat Vkes V P L T J
M3 28.710 28.710 1.200 1.100 1.450 15.000
Volume Keseluruhan M3 28.710
2 Pekerjaan Galian Tanah Biasa Sat Vkes V P L T J
1 PM1 M3 12.160 12.160 30.400 0.800 0.500 1.000
2 PM1 M3 8.080 8.080 20.200 0.800 0.500 1.000
3 M3 2.280 2.280 5.700 0.800 0.500 1.000
4 M3 0.743 0.743 1.857 0.800 0.500 1.000
5 M3 3.800 3.800 9.500 0.800 0.500 1.000
6 M3 1.280 1.280 3.200 0.800 0.500 1.000
7 M3 2.200 2.200 5.500 0.800 0.500 1.000
8 M3 4.480 4.480 11.200 0.800 0.500 1.000
9 M3 1.600 1.600 4.000 0.800 0.500 1.000
10 M3 4.840 4.840 12.100 0.800 0.500 1.000
11 M3 3.444 3.444 8.610 0.800 0.500 1.000
12 M3 0.360 0.360 0.900 0.800 0.500 1.000
13 M3 4.000 4.000 10.000 0.800 0.500 1.000
14 M3 6.800 6.800 17.000 0.800 0.500 1.000
15 M3 1.180 1.180 2.950 0.800 0.500 1.000
16 M3 4.440 4.440 11.100 0.800 0.500 1.000
17 M3 0.800 0.800 2.000 0.800 0.500 1.000
18 M3 4.820 4.820 12.050 0.800 0.500 1.000
19 M3 0.620 0.620 1.550 0.800 0.500 1.000
20 M3 0.620 0.620 1.550 0.800 0.500 1.000
Volume Keseluruhan M3 68.547
3 Pekerjaan Pengerugan Kembali Sat Vkes V P L T J
Volume Keseluruhan M3 32.419
4 Pekerjaan Pengurugan Pasir Alas Pondasi Sat Vkes V P L T J
1 Pondasi Poer Plat M3 0.990 0.990 1.200 1.100 0.050 15.000
2 M3 1.216 1.216 30.400 0.800 0.050 1.000
3 M3 0.808 0.808 20.200 0.800 0.050 1.000
4 M3 0.228 0.228 5.700 0.800 0.050 1.000
5 M3 0.074 0.074 1.857 0.800 0.050 1.000
6 M3 0.380 0.380 9.500 0.800 0.050 1.000
7 M3 0.128 0.128 3.200 0.800 0.050 1.000
8 M3 0.220 0.220 5.500 0.800 0.050 1.000
9 M3 0.448 0.448 11.200 0.800 0.050 1.000
10 M3 0.160 0.160 4.000 0.800 0.050 1.000
11 M3 0.484 0.484 12.100 0.800 0.050 1.000
12 M3 0.344 0.344 8.610 0.800 0.050 1.000
13 M3 0.036 0.036 0.900 0.800 0.050 1.000
14 M3 0.400 0.400 10.000 0.800 0.050 1.000
15 M3 0.680 0.680 17.000 0.800 0.050 1.000
16 M3 0.118 0.118 2.950 0.800 0.050 1.000
17 M3 0.444 0.444 11.100 0.800 0.050 1.000
18 M3 0.080 0.080 2.000 0.800 0.050 1.000
19 M3 0.482 0.482 12.050 0.800 0.050 1.000
20 M3 0.062 0.062 1.550 0.800 0.050 1.000
21 M3 0.062 0.062 1.550 0.800 0.050 1.000
Volume Keseluruhan M3 7.845
5 Pekerjaan Penimbunan Tanah Alas Lantai Sat Vkes V P L T J
1 M3 13.064 13.064 5.730 2.280 1.000 1.000
2 M3 8.800 8.800 2.750 3.200 1.000 1.000
3 M3 4.576 4.576 1.430 3.200 1.000 1.000
4 M3 11.514 11.514 5.050 2.280 1.000 1.000
5 M3 7.622 7.622 1.430 5.330 1.000 1.000
6 M3 2.646 2.646 1.430 1.850 1.000 1.000
7 M3 2.545 2.545 1.430 1.780 1.000 1.000
8 M3 26.578 26.578 6.850 3.880 1.000 1.000
9 M3 4.810 4.810 1.850 2.600 1.000 1.000
10 M3 4.810 4.810 1.850 2.600 1.000 1.000
11 M3 7.918 7.918 1.480 5.350 1.000 1.000
12 M3 10.962 10.962 3.480 3.150 1.000 1.000
13 M3 15.120 15.120 4.800 3.150 1.000 1.000
14 M3 37.344 37.344 4.800 7.780 1.000 1.000
15 M3 2.646 2.646 1.430 1.850 1.000 1.000
16 M3 2.688 2.688 1.430 1.880 1.000 1.000
17 M3 7.860 7.860 2.000 3.930 1.000 1.000
18 M3 9.647 9.647 1.240 7.780 1.000 1.000
19 M3 2.250 2.250 2.250 1.000 1.000
20 M3 1.330 1.330 1.330 1.000 1.000
21 M3 5.300 5.300 5.300 1.000 1.000
22 M3 3.225 3.225 4.300 0.750 1.000 1.000
Volume Keseluruhan M3 193.255
6 Pekerjaan Pengurugan Pasir Alas Lantai Sat Vkes V P L T J
1 M3 0.653 0.653 5.730 2.280 0.050 1.000
2 M3 0.440 0.440 2.750 3.200 0.050 1.000
3 M3 0.229 0.229 1.430 3.200 0.050 1.000
4 M3 0.576 0.576 5.050 2.280 0.050 1.000
5 M3 0.381 0.381 1.430 5.330 0.050 1.000
6 M3 0.132 0.132 1.430 1.850 0.050 1.000
7 M3 0.127 0.127 1.430 1.780 0.050 1.000
8 M3 1.329 1.329 6.850 3.880 0.050 1.000
9 M3 0.241 0.241 1.850 2.600 0.050 1.000
10 M3 0.241 0.241 1.850 2.600 0.050 1.000
11 M3 0.396 0.396 1.480 5.350 0.050 1.000
12 M3 0.548 0.548 3.480 3.150 0.050 1.000
13 M3 0.756 0.756 4.800 3.150 0.050 1.000
14 M3 1.867 1.867 4.800 7.780 0.050 1.000
15 M3 0.132 0.132 1.430 1.850 0.050 1.000
16 M3 0.134 0.134 1.430 1.880 0.050 1.000
17 M3 0.393 0.393 2.000 3.930 0.050 1.000
18 M3 0.482 0.482 1.240 7.780 0.050 1.000
19 M3 0.113 0.113 2.250 0.050 1.000
20 M3 0.067 0.067 1.330 0.050 1.000
21 M3 0.265 0.265 5.300 0.050 1.000
22 M3 0.161 0.161 4.300 0.750 0.050 1.000
Volume Keseluruhan M3 9.663
C PEKERJAAN PONDASI
1 Pekerjaan Batu Kosong Sat Vkes V P L T J PA PB LA LB TA TB
1 M3 3.648 3.648 30.400 0.800 0.150 1.000 30.400 30.400 0.800 0.800 0.150 0.150
2 M3 2.424 2.424 20.200 0.800 0.150 1.000 20.200 20.200 0.800 0.800 0.150 0.150
M3 0.684 0.684 5.700 0.800 0.150 1.000 5.700 5.700 0.800 0.800 0.150 0.150
M3 0.223 0.223 1.857 0.800 0.150 1.000 1.857 1.857 0.800 0.800 0.150 0.150
M3 1.140 1.140 9.500 0.800 0.150 1.000 9.500 9.500 0.800 0.800 0.150 0.150
M3 0.384 0.384 3.200 0.800 0.150 1.000 3.200 3.200 0.800 0.800 0.150 0.150
M3 0.660 0.660 5.500 0.800 0.150 1.000 5.500 5.500 0.800 0.800 0.150 0.150
M3 1.344 1.344 11.200 0.800 0.150 1.000 11.200 11.200 0.800 0.800 0.150 0.150
M3 0.480 0.480 4.000 0.800 0.150 1.000 4.000 4.000 0.800 0.800 0.150 0.150
M3 1.452 1.452 12.100 0.800 0.150 1.000 12.100 12.100 0.800 0.800 0.150 0.150
M3 1.033 1.033 8.610 0.800 0.150 1.000 8.610 8.610 0.800 0.800 0.150 0.150
M3 0.108 0.108 0.900 0.800 0.150 1.000 0.900 0.900 0.800 0.800 0.150 0.150
M3 1.200 1.200 10.000 0.800 0.150 1.000 10.000 10.000 0.800 0.800 0.150 0.150
M3 2.040 2.040 17.000 0.800 0.150 1.000 17.000 17.000 0.800 0.800 0.150 0.150
M3 0.354 0.354 2.950 0.800 0.150 1.000 2.950 2.950 0.800 0.800 0.150 0.150
M3 1.332 1.332 11.100 0.800 0.150 1.000 11.100 11.100 0.800 0.800 0.150 0.150
M3 0.240 0.240 2.000 0.800 0.150 1.000 2.000 2.000 0.800 0.800 0.150 0.150
M3 1.446 1.446 12.050 0.800 0.150 1.000 12.050 12.050 0.800 0.800 0.150 0.150
M3 0.186 0.186 1.550 0.800 0.150 1.000 1.550 1.550 0.800 0.800 0.150 0.150
M3 0.186 0.186 1.550 0.800 0.150 1.000 1.550 1.550 0.800 0.800 0.150 0.150
Volume Keseluruhan M3 20.564
2 Pekerjaan Pondasi Batu Belah Camp 1:4 Sat Vkes V P L T J PA PB LA LB TA TB
1 M3 15.808 15.808 30.400 0.520 1.000 1.000 30.400 30.400 0.340 0.700 1.000 1.000
2 M3 10.504 10.504 20.200 0.520 1.000 1.000 20.200 20.200 0.340 0.700 1.000 1.000
M3 3.135 3.135 5.700 0.500 1.100 1.000 5.700 5.700 0.300 0.700 1.100 1.100
M3 1.021 1.021 1.857 0.500 1.100 1.000 1.857 1.857 0.300 0.700 1.100 1.100
M3 5.225 5.225 9.500 0.500 1.100 1.000 9.500 9.500 0.300 0.700 1.100 1.100
M3 1.760 1.760 3.200 0.500 1.100 1.000 3.200 3.200 0.300 0.700 1.100 1.100
M3 3.025 3.025 5.500 0.500 1.100 1.000 5.500 5.500 0.300 0.700 1.100 1.100
M3 6.160 6.160 11.200 0.500 1.100 1.000 11.200 11.200 0.300 0.700 1.100 1.100
M3 2.200 2.200 4.000 0.500 1.100 1.000 4.000 4.000 0.300 0.700 1.100 1.100
M3 6.655 6.655 12.100 0.500 1.100 1.000 12.100 12.100 0.300 0.700 1.100 1.100
M3 4.736 4.736 8.610 0.500 1.100 1.000 8.610 8.610 0.300 0.700 1.100 1.100
M3 0.495 0.495 0.900 0.500 1.100 1.000 0.900 0.900 0.300 0.700 1.100 1.100
M3 5.500 5.500 10.000 0.500 1.100 1.000 10.000 10.000 0.300 0.700 1.100 1.100
M3 9.350 9.350 17.000 0.500 1.100 1.000 17.000 17.000 0.300 0.700 1.100 1.100
M3 1.623 1.623 2.950 0.500 1.100 1.000 2.950 2.950 0.300 0.700 1.100 1.100
M3 6.105 6.105 11.100 0.500 1.100 1.000 11.100 11.100 0.300 0.700 1.100 1.100
M3 1.100 1.100 2.000 0.500 1.100 1.000 2.000 2.000 0.300 0.700 1.100 1.100
M3 6.628 6.628 12.050 0.500 1.100 1.000 12.050 12.050 0.300 0.700 1.100 1.100
M3 0.853 0.853 1.550 0.500 1.100 1.000 1.550 1.550 0.300 0.700 1.100 1.100
M3 0.853 0.853 1.550 0.500 1.100 1.000 1.550 1.550 0.300 0.700 1.100 1.100
Volume Keseluruhan M3 92.734
D PEKERJAAN BETON
1 Pekerjaan Pondasi Poer Plat 110.100.25 (K275)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 4.125 4.125 1.100 1.000 0.250 15.000
M3 4.050 4.050 0.400 0.300 2.250 15.000
Volume Keseluruhan M3 8.175
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 x.12 Kg 237.762 237.762 2.500 15.000 2.550 0.050 7.000 0.888 15.851
y.12 Kg 195.804 195.804 2.400 15.000 2.450 0.050 6.000 0.888 13.054
Tulangan Tengah Kolom. 12 Kg 147.586 147.586 2.720 15.000 2.770 0.050 4.000 0.888 9.839
Tulangan Sudut Kolom. 12 Kg 151.848 151.848 2.800 15.000 2.850 0.050 4.000 0.888 10.123
Begel Tumpuan. 8 Kg 94.776 94.776 1.240 15.000 1.290 0.050 0.100 12.400 0.395 6.318
Begel Lapangan. 8 Kg 61.146 61.146 1.240 15.000 1.290 0.050 0.150 8.000 0.395 4.076
Volume Keseluruhan Kg 888.922
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 15.750 15.750 4.200 0.000 0.250 15.000
M2 47.250 47.250 1.400 0.000 2.250 15.000
Volume Keseluruhan M2 63.000
2 Pekerjaan Sloof 30/20 (K225)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.348 0.348 2.900 0.200 0.300 2.000
2 M3 1.332 1.332 3.700 0.200 0.300 6.000
3 M3 1.104 1.104 4.600 0.200 0.300 4.000
Volume Keseluruhan M3 2.784
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 11.366 11.366 2.900 2.000 3.200 0.300 2.000 0.888 5.683
Tulangan Tengah. 10 Kg 7.404 7.404 2.900 2.000 3.000 0.100 2.000 0.617 3.702
Tulangan Bawah. 12 Kg 10.656 10.656 2.900 2.000 3.000 0.100 2.000 0.888 5.328
Tulangan TumLap Kg 7.015 7.015 2.900 2.000 3.950 1.050 1.000 0.888 3.508
Tulangan Pinggang Kg
Begel Tumpuan. 8 Kg 12.028 12.028 1.450 2.000 1.050 0.050 0.100 14.500 0.395 6.014
Begel Lapangan. 8 Kg 6.014 6.014 1.450 2.000 1.050 0.050 0.200 7.250 0.395 3.007
2 Tulangan Atas. 12 Kg 42.624 42.624 3.700 6.000 4.000 0.300 2.000 0.888 7.104
Tulangan Tengah. 10 Kg 28.135 28.135 3.700 6.000 3.800 0.100 2.000 0.617 4.689
Tulangan Bawah. 12 Kg 40.493 40.493 3.700 6.000 3.800 0.100 2.000 0.888 6.749
Tulangan TumLap Kg 25.308 25.308 3.700 6.000 4.750 1.050 1.000 0.888 4.218
Tulangan Pinggang Kg
Begel Tumpuan. 8 Kg 46.037 46.037 1.850 6.000 1.050 0.050 0.100 18.500 0.395 7.673
Begel Lapangan. 8 Kg 23.019 23.019 1.850 6.000 1.050 0.050 0.200 9.250 0.395 3.836
3 Tulangan Atas. 12 Kg 34.810 34.810 4.600 4.000 4.900 0.300 2.000 0.888 8.702
Tulangan Tengah. 10 Kg 23.199 23.199 4.600 4.000 4.700 0.100 2.000 0.617 5.800
Tulangan Bawah. 12 Kg 33.389 33.389 4.600 4.000 4.700 0.100 2.000 0.888 8.347
Tulangan TumLap Kg 20.069 20.069 4.600 4.000 5.650 1.050 1.000 0.888 5.017
Tulangan Pinggang Kg
Begel Tumpuan. 8 Kg 38.157 38.157 2.300 4.000 1.050 0.050 0.100 23.000 0.395 9.539
Begel Lapangan. 8 Kg 19.079 19.079 2.300 4.000 1.050 0.050 0.200 11.500 0.395 4.770
Volume Keseluruhan Kg 428.801
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 3.480 3.480 2.900 0.000 0.600 2.000
2 M2 13.320 13.320 3.700 0.000 0.600 6.000
3 M2 11.040 11.040 4.600 0.000 0.600 4.000
Volume Keseluruhan M2 27.840
3 Pekerjaan Sloof 20/15 (K200)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.068 0.068 2.250 0.150 0.200 1.000
2 M3 0.093 0.093 3.100 0.150 0.200 1.000
3 M3 0.048 0.048 1.600 0.150 0.200 1.000
4 M3 0.095 0.095 3.150 0.150 0.200 1.000
5 M3 0.156 0.156 2.600 0.150 0.200 2.000
6 M3 0.156 0.156 2.600 0.150 0.200 2.000
7 M3 0.056 0.056 1.850 0.150 0.200 1.000
8 M3 0.056 0.056 1.875 0.150 0.200 1.000
9 M3 0.087 0.087 2.900 0.150 0.200 1.000
10 M3 0.068 0.068 2.275 0.150 0.200 1.000
11 M3 0.038 0.038 1.275 0.150 0.200 1.000
12 M3 0.111 0.111 3.700 0.150 0.200 1.000
13 M3 0.056 0.056 1.850 0.150 0.200 1.000
14 M3 0.056 0.056 1.875 0.150 0.200 1.000
15 M3 0.020 0.020 0.650 0.150 0.200 1.000
16 M3 0.249 0.249 8.300 0.150 0.200 1.000
17 M3 0.168 0.168 2.800 0.150 0.200 2.000
18 M3 0.243 0.243 2.700 0.150 0.200 3.000
19 M3 0.037 0.037 1.225 0.150 0.200 1.000
20 M3 0.097 0.097 3.225 0.150 0.200 1.000
21 M3 0.138 0.138 4.600 0.150 0.200 1.000
22 M3 0.043 0.043 1.425 0.150 0.200 1.000
23 M3 0.167 0.167 1.850 0.150 0.200 3.000
24 M3 0.047 0.047 1.550 0.150 0.200 1.000
25 M3 0.074 0.074 1.225 0.150 0.200 2.000
26 M3 0.097 0.097 3.225 0.150 0.200 1.000
27 M3 0.066 0.066 2.200 0.150 0.200 1.000
28 M3 0.054 0.054 1.800 0.150 0.200 1.000
29 M3 0.021 0.021 0.700 0.150 0.200 1.000
30 M3 0.057 0.057 1.900 0.150 0.200 1.000
Volume Keseluruhan M3 2.718
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 4.085 4.085 2.250 1.000 2.300 0.050 2.000 0.888 4.085
Tulangan Bawah. 12 Kg 4.085 4.085 2.250 1.000 2.300 0.050 2.000 0.888 4.085
Begel Tumpuan. 8 Kg 4.666 4.666 2.250 1.000 2.300 0.050 1.050 0.050 0.200 11.250 0.395 4.666
2 Tulangan Atas. 12 Kg 5.594 5.594 3.100 1.000 3.150 0.050 2.000 0.888 5.594
Tulangan Bawah. 12 Kg 5.594 5.594 3.100 1.000 3.150 0.050 2.000 0.888 5.594
Begel Tumpuan. 8 Kg 6.429 6.429 3.100 1.000 3.150 0.050 1.050 0.050 0.200 15.500 0.395 6.429
3 Tulangan Atas. 12 Kg 2.930 2.930 1.600 1.000 1.650 0.050 2.000 0.888 2.930
Tulangan Bawah. 12 Kg 2.930 2.930 1.600 1.000 1.650 0.050 2.000 0.888 2.930
Begel Tumpuan. 8 Kg 3.318 3.318 1.600 1.000 1.650 0.050 1.050 0.050 0.200 8.000 0.395 3.318
4 Tulangan Atas. 12 Kg 5.683 5.683 3.150 1.000 3.200 0.050 2.000 0.888 5.683
Tulangan Bawah. 12 Kg 5.683 5.683 3.150 1.000 3.200 0.050 2.000 0.888 5.683
Begel Tumpuan. 8 Kg 6.532 6.532 3.150 1.000 3.200 0.050 1.050 0.050 0.200 15.750 0.395 6.532
5 Tulangan Atas. 12 Kg 9.413 9.413 2.600 2.000 2.650 0.050 2.000 0.888 4.706
Tulangan Bawah. 12 Kg 9.413 9.413 2.600 2.000 2.650 0.050 2.000 0.888 4.706
Begel Tumpuan. 8 Kg 10.784 10.784 2.600 2.000 2.650 0.050 1.050 0.050 0.200 13.000 0.395 5.392
6 Tulangan Atas. 12 Kg 9.413 9.413 2.600 2.000 2.650 0.050 2.000 0.888 4.706
Tulangan Bawah. 12 Kg 9.413 9.413 2.600 2.000 2.650 0.050 2.000 0.888 4.706
Begel Tumpuan. 8 Kg 10.784 10.784 2.600 2.000 2.650 0.050 1.050 0.050 0.200 13.000 0.395 5.392
7 Tulangan Atas. 12 Kg 3.374 3.374 1.850 1.000 1.900 0.050 2.000 0.888 3.374
Tulangan Bawah. 12 Kg 3.374 3.374 1.850 1.000 1.900 0.050 2.000 0.888 3.374
Begel Tumpuan. 8 Kg 3.836 3.836 1.850 1.000 1.900 0.050 1.050 0.050 0.200 9.250 0.395 3.836
8 Tulangan Atas. 12 Kg 3.419 3.419 1.875 1.000 1.925 0.050 2.000 0.888 3.419
Tulangan Bawah. 12 Kg 3.419 3.419 1.875 1.000 1.925 0.050 2.000 0.888 3.419
Begel Tumpuan. 8 Kg 3.888 3.888 1.875 1.000 1.925 0.050 1.050 0.050 0.200 9.375 0.395 3.888
9 Tulangan Atas. 12 Kg 5.239 5.239 2.900 1.000 2.950 0.050 2.000 0.888 5.239
Tulangan Bawah. 12 Kg 5.239 5.239 2.900 1.000 2.950 0.050 2.000 0.888 5.239
Begel Tumpuan. 8 Kg 6.014 6.014 2.900 1.000 2.950 0.050 1.050 0.050 0.200 14.500 0.395 6.014
10 Tulangan Atas. 12 Kg 4.129 4.129 2.275 1.000 2.325 0.050 2.000 0.888 4.129
Tulangan Bawah. 12 Kg 4.129 4.129 2.275 1.000 2.325 0.050 2.000 0.888 4.129
Begel Tumpuan. 8 Kg 4.718 4.718 2.275 1.000 2.325 0.050 1.050 0.050 0.200 11.375 0.395 4.718
11 Tulangan Atas. 12 Kg 2.353 2.353 1.275 1.000 1.325 0.050 2.000 0.888 2.353
Tulangan Bawah. 12 Kg 2.353 2.353 1.275 1.000 1.325 0.050 2.000 0.888 2.353
Begel Tumpuan. 8 Kg 2.644 2.644 1.275 1.000 1.325 0.050 1.050 0.050 0.200 6.375 0.395 2.644
12 Tulangan Atas. 12 Kg 6.660 6.660 3.700 1.000 3.750 0.050 2.000 0.888 6.660
Tulangan Bawah. 12 Kg 6.660 6.660 3.700 1.000 3.750 0.050 2.000 0.888 6.660
Begel Tumpuan. 8 Kg 7.673 7.673 3.700 1.000 3.750 0.050 1.050 0.050 0.200 18.500 0.395 7.673
13 Tulangan Atas. 12 Kg 3.374 3.374 1.850 1.000 1.900 0.050 2.000 0.888 3.374
Tulangan Bawah. 12 Kg 3.374 3.374 1.850 1.000 1.900 0.050 2.000 0.888 3.374
Begel Tumpuan. 8 Kg 3.836 3.836 1.850 1.000 1.900 0.050 1.050 0.050 0.200 9.250 0.395 3.836
14 Tulangan Atas. 12 Kg 3.419 3.419 1.875 1.000 1.925 0.050 2.000 0.888 3.419
Tulangan Bawah. 12 Kg 3.419 3.419 1.875 1.000 1.925 0.050 2.000 0.888 3.419
Begel Tumpuan. 8 Kg 3.888 3.888 1.875 1.000 1.925 0.050 1.050 0.050 0.200 9.375 0.395 3.888
15 Tulangan Atas. 12 Kg 1.243 1.243 0.650 1.000 0.700 0.050 2.000 0.888 1.243
Tulangan Bawah. 12 Kg 1.243 1.243 0.650 1.000 0.700 0.050 2.000 0.888 1.243
Begel Tumpuan. 8 Kg 1.348 1.348 0.650 1.000 0.700 0.050 1.050 0.050 0.200 3.250 0.395 1.348
16 Tulangan Atas. 12 Kg 14.830 14.830 8.300 1.000 8.350 0.050 2.000 0.888 14.830
Tulangan Bawah. 12 Kg 14.830 14.830 8.300 1.000 8.350 0.050 2.000 0.888 14.830
Begel Tumpuan. 8 Kg 17.212 17.212 8.300 1.000 8.350 0.050 1.050 0.050 0.200 41.500 0.395 17.212
17 Tulangan Atas. 12 Kg 10.123 10.123 2.800 2.000 2.850 0.050 2.000 0.888 5.062
Tulangan Bawah. 12 Kg 10.123 10.123 2.800 2.000 2.850 0.050 2.000 0.888 5.062
Begel Tumpuan. 8 Kg 11.613 11.613 2.800 2.000 2.850 0.050 1.050 0.050 0.200 14.000 0.395 5.807
18 Tulangan Atas. 12 Kg 14.652 14.652 2.700 3.000 2.750 0.050 2.000 0.888 4.884
Tulangan Bawah. 12 Kg 14.652 14.652 2.700 3.000 2.750 0.050 2.000 0.888 4.884
Begel Tumpuan. 8 Kg 16.797 16.797 2.700 3.000 2.750 0.050 1.050 0.050 0.200 13.500 0.395 5.599
19 Tulangan Atas. 12 Kg 2.264 2.264 1.225 1.000 1.275 0.050 2.000 0.888 2.264
Tulangan Bawah. 12 Kg 2.264 2.264 1.225 1.000 1.275 0.050 2.000 0.888 2.264
Begel Tumpuan. 8 Kg 2.540 2.540 1.225 1.000 1.275 0.050 1.050 0.050 0.200 6.125 0.395 2.540
20 Tulangan Atas. 12 Kg 5.816 5.816 3.225 1.000 3.275 0.050 2.000 0.888 5.816
Tulangan Bawah. 12 Kg 5.816 5.816 3.225 1.000 3.275 0.050 2.000 0.888 5.816
Begel Tumpuan. 8 Kg 6.688 6.688 3.225 1.000 3.275 0.050 1.050 0.050 0.200 16.125 0.395 6.688
21 Tulangan Atas. 12 Kg 5.816 5.816 3.225 1.000 3.275 0.050 2.000 0.888 5.816
Tulangan Bawah. 12 Kg 5.816 5.816 3.225 1.000 3.275 0.050 2.000 0.888 5.816
Begel Tumpuan. 8 Kg 6.688 6.688 3.225 1.000 3.275 0.050 1.050 0.050 0.200 16.125 0.395 6.688
22 Tulangan Atas. 12 Kg 8.258 8.258 4.600 1.000 4.650 0.050 2.000 0.888 8.258
Tulangan Bawah. 12 Kg 8.258 8.258 4.600 1.000 4.650 0.050 2.000 0.888 8.258
Begel Tumpuan. 8 Kg 9.539 9.539 4.600 1.000 4.650 0.050 1.050 0.050 0.200 23.000 0.395 9.539
23 Tulangan Atas. 12 Kg 2.620 2.620 1.425 1.000 1.475 0.050 2.000 0.888 2.620
Tulangan Bawah. 12 Kg 2.620 2.620 1.425 1.000 1.475 0.050 2.000 0.888 2.620
Begel Tumpuan. 8 Kg 2.955 2.955 1.425 1.000 1.475 0.050 1.050 0.050 0.200 7.125 0.395 2.955
24 Tulangan Atas. 12 Kg 10.123 10.123 1.850 3.000 1.900 0.050 2.000 0.888 3.374
Tulangan Bawah. 12 Kg 10.123 10.123 1.850 3.000 1.900 0.050 2.000 0.888 3.374
Begel Tumpuan. 8 Kg 11.509 11.509 1.850 3.000 1.900 0.050 1.050 0.050 0.200 9.250 0.395 3.836
25 Tulangan Atas. 12 Kg 2.842 2.842 1.550 1.000 1.600 0.050 2.000 0.888 2.842
Tulangan Bawah. 12 Kg 2.842 2.842 1.550 1.000 1.600 0.050 2.000 0.888 2.842
Begel Tumpuan. 8 Kg 3.214 3.214 1.550 1.000 1.600 0.050 1.050 0.050 0.200 7.750 0.395 3.214
26 Tulangan Atas. 12 Kg 4.529 4.529 1.225 2.000 1.275 0.050 2.000 0.888 2.264
Tulangan Bawah. 12 Kg 4.529 4.529 1.225 2.000 1.275 0.050 2.000 0.888 2.264
Begel Tumpuan. 8 Kg 5.081 5.081 1.225 2.000 1.275 0.050 1.050 0.050 0.200 6.125 0.395 2.540
27 Tulangan Atas. 12 Kg 5.816 5.816 3.225 1.000 3.275 0.050 2.000 0.888 5.816
Tulangan Bawah. 12 Kg 5.816 5.816 3.225 1.000 3.275 0.050 2.000 0.888 5.816
Begel Tumpuan. 8 Kg 6.688 6.688 3.225 1.000 3.275 0.050 1.050 0.050 0.200 16.125 0.395 6.688
28 Tulangan Atas. 12 Kg 3.996 3.996 2.200 1.000 2.250 0.050 2.000 0.888 3.996
Tulangan Bawah. 12 Kg 3.996 3.996 2.200 1.000 2.250 0.050 2.000 0.888 3.996
Begel Tumpuan. 8 Kg 4.562 4.562 2.200 1.000 2.250 0.050 1.050 0.050 0.200 11.000 0.395 4.562
29 Tulangan Atas. 12 Kg 3.286 3.286 1.800 1.000 1.850 0.050 2.000 0.888 3.286
Tulangan Bawah. 12 Kg 3.286 3.286 1.800 1.000 1.850 0.050 2.000 0.888 3.286
Begel Tumpuan. 8 Kg 3.733 3.733 1.800 1.000 1.850 0.050 1.050 0.050 0.200 9.000 0.395 3.733
30 Tulangan Atas. 12 Kg 1.332 1.332 0.700 1.000 0.750 0.050 2.000 0.888 1.332
Tulangan Bawah. 12 Kg 1.332 1.332 0.700 1.000 0.750 0.050 2.000 0.888 1.332
Begel Tumpuan. 8 Kg 1.452 1.452 0.700 1.000 0.750 0.050 1.050 0.050 0.200 3.500 0.395 1.452
Volume Keseluruhan Kg 523.896
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 0.900 0.900 2.250 0.000 0.400 1.000
2 M2 1.240 1.240 3.100 0.000 0.400 1.000
3 M2 0.640 0.640 1.600 0.000 0.400 1.000
4 M2 1.260 1.260 3.150 0.000 0.400 1.000
5 M2 2.080 2.080 2.600 0.000 0.400 2.000
6 M2 2.080 2.080 2.600 0.000 0.400 2.000
7 M2 0.740 0.740 1.850 0.000 0.400 1.000
8 M2 0.750 0.750 1.875 0.000 0.400 1.000
9 M2 1.160 1.160 2.900 0.000 0.400 1.000
10 M2 0.910 0.910 2.275 0.000 0.400 1.000
11 M2 0.510 0.510 1.275 0.000 0.400 1.000
12 M2 1.480 1.480 3.700 0.000 0.400 1.000
13 M2 0.740 0.740 1.850 0.000 0.400 1.000
14 M2 0.750 0.750 1.875 0.000 0.400 1.000
15 M2 0.260 0.260 0.650 0.000 0.400 1.000
16 M2 3.320 3.320 8.300 0.000 0.400 1.000
17 M2 2.240 2.240 2.800 0.000 0.400 2.000
18 M2 3.240 3.240 2.700 0.000 0.400 3.000
19 M2 0.490 0.490 1.225 0.000 0.400 1.000
20 M2 1.290 1.290 3.225 0.000 0.400 1.000
21 M2 1.840 1.840 4.600 0.000 0.400 1.000
22 M2 0.570 0.570 1.425 0.000 0.400 1.000
23 M2 2.220 2.220 1.850 0.000 0.400 3.000
24 M2 0.620 0.620 1.550 0.000 0.400 1.000
25 M2 0.980 0.980 1.225 0.000 0.400 2.000
26 M2 1.290 1.290 3.225 0.000 0.400 1.000
27 M2 0.880 0.880 2.200 0.000 0.400 1.000
28 M2 0.720 0.720 1.800 0.000 0.400 1.000
29 M2 0.280 0.280 0.700 0.000 0.400 1.000
30 M2 0.760 0.760 1.900 0.000 0.400 1.000
Volume Keseluruhan M2 36.240
4 Pekerjaan Kolom Lantai(I) 40/30 (K250)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 7.200 7.200 4.000 0.300 0.400 15.000
Volume Keseluruhan M3 7.200
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 107.892 107.892 4.000 15.000 4.050 0.050 2.000 0.888 7.193
Tulangan Tengah. 12 Kg 107.892 107.892 4.000 15.000 4.050 0.050 2.000 0.888 7.193
Tulangan Bawah. 12 Kg 107.892 107.892 4.000 15.000 4.050 0.050 2.000 0.888 7.193
Tulangan Pinggang Kg 27.650 27.650 4.000 15.000 0.350 0.050 0.300 13.333 0.395 1.843
Begel Tumpuan. 8 Kg 82.950 82.950 2.000 15.000 1.050 0.050 0.150 13.333 0.395 5.530
Begel Lapangan. 8 Kg 82.950 82.950 2.000 15.000 1.050 0.050 0.150 13.333 0.395 5.530
Volume Keseluruhan Kg 517.226
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 84.000 84.000 4.000 1.400 0.000 15.000
Volume Keseluruhan M2 84.000
5 Pekerjaan Kolom Lantai(II) 40/30 (K225)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 5.760 5.760 4.000 0.300 0.400 12.000
2 M4 1.260 1.260 3.500 0.300 0.400 3.000
Volume Keseluruhan M3 7.020
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 86.314 86.314 4.000 12.000 4.050 0.050 2.000 0.888 7.193
Tulangan Tengah. 12 Kg 86.314 86.314 4.000 12.000 4.050 0.050 2.000 0.888 7.193
Tulangan Bawah. 12 Kg 86.314 86.314 4.000 12.000 4.050 0.050 2.000 0.888 7.193
Tulangan Pinggang Kg 22.120 22.120 4.000 12.000 0.350 0.050 0.300 13.333 0.395 1.843
Begel Tumpuan. 8 Kg 66.360 66.360 2.000 12.000 1.050 0.050 0.150 13.333 0.395 5.530
Begel Lapangan. 8 Kg 66.360 66.360 2.000 12.000 1.050 0.050 0.150 13.333 0.395 5.530
2 Tulangan Atas. 12 Kg 18.914 18.914 3.500 3.000 3.550 0.050 2.000 0.888 6.305
Tulangan Tengah. 12 Kg 18.914 18.914 3.500 3.000 3.550 0.050 2.000 0.888 6.305
Tulangan Bawah. 12 Kg 18.914 18.914 3.500 3.000 3.550 0.050 2.000 0.888 6.305
Tulangan Pinggang Kg 4.839 4.839 3.500 3.000 0.350 0.050 0.300 11.667 0.395 1.613
Begel Tumpuan. 8 Kg 14.516 14.516 1.750 3.000 1.050 0.050 0.150 11.667 0.395 4.839
Begel Lapangan. 8 Kg 14.516 14.516 1.750 3.000 1.050 0.050 0.150 11.667 0.395 4.839
Volume Keseluruhan Kg 504.395
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 67.200 67.200 4.000 1.400 0.000 12.000
2 M2 14.700 14.700 3.500 1.400 0.000 3.000
Volume Keseluruhan M2 81.900
6 Pekerjaan Kolom 20/20 (K225)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.140 0.140 3.500 0.200 0.200 1.000
2 M3 1.680 1.680 4.000 0.200 0.300 7.000
3 M3 0.144 0.144 3.600 0.200 0.200 1.000
4 M3 1.200 1.200 7.500 0.200 0.200 4.000
Volume Keseluruhan M3 3.164
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 6.749 6.749 3.500 1.000 3.800 0.300 2.000 0.888 6.749
Tulangan Bawah. 12 Kg 6.394 6.394 3.500 1.000 3.600 0.100 2.000 0.888 6.394
Begel Tumpuan. 8 Kg 4.839 4.839 1.750 1.000 1.050 0.050 0.150 11.667 0.395 4.839
Begel Lapangan. 8 Kg 4.839 4.839 1.750 1.000 1.050 0.050 0.150 11.667 0.395 4.839
2 Tulangan Atas. 12 Kg 53.458 53.458 4.000 7.000 4.300 0.300 2.000 0.888 7.637
Tulangan Bawah. 12 Kg 50.971 50.971 4.000 7.000 4.100 0.100 2.000 0.888 7.282
Begel Tumpuan. 8 Kg 38.710 38.710 2.000 7.000 1.050 0.050 0.150 13.333 0.395 5.530
Begel Lapangan. 8 Kg 38.710 38.710 2.000 7.000 1.050 0.050 0.150 13.333 0.395 5.530
3 Tulangan Atas. 12 Kg 6.926 6.926 3.600 1.000 3.900 0.300 2.000 0.888 6.926
Tulangan Bawah. 12 Kg 6.571 6.571 3.600 1.000 3.700 0.100 2.000 0.888 6.571
Begel Tumpuan. 8 Kg 4.977 4.977 1.800 1.000 1.050 0.050 0.150 12.000 0.395 4.977
Begel Lapangan. 8 Kg 4.977 4.977 1.800 1.000 1.050 0.050 0.150 12.000 0.395 4.977
4 Tulangan Atas. 12 Kg 55.411 55.411 7.500 4.000 7.800 0.300 2.000 0.888 13.853
Tulangan Bawah. 12 Kg 53.990 53.990 7.500 4.000 7.600 0.100 2.000 0.888 13.498
Begel Tumpuan. 8 Kg 41.475 41.475 3.750 4.000 1.050 0.050 0.150 25.000 0.395 10.369
Begel Lapangan. 8 Kg 41.475 41.475 3.750 4.000 1.050 0.050 0.150 25.000 0.395 10.369
Volume Keseluruhan Kg 420.472
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 1.400 1.400 3.500 0.400 0.000 1.000
2 M2 11.200 11.200 4.000 0.400 0.000 7.000
3 M2 1.440 1.440 3.600 0.400 0.000 1.000
4 M2 12.000 12.000 7.500 0.400 0.000 4.000
Volume Keseluruhan M2 12.600
7 Pekerjaan Kolom 15/15 (K200)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.612 0.612 3.400 0.150 0.150 8.000
2 M3 0.513 0.513 3.800 0.150 0.150 6.000
3 M3 0.162 0.162 3.600 0.150 0.150 2.000
4 M3 1.112 1.112 3.800 0.150 0.150 13.000
Volume Keseluruhan M3 2.399
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 10 Kg 34.058 34.058 3.400 8.000 3.450 0.050 2.000 0.617 4.257
Tulangan Bawah. 10 Kg 34.058 34.058 3.400 8.000 3.450 0.050 2.000 0.617 4.257
Begel Tumpuan. 8 Kg 28.203 28.203 1.700 8.000 1.050 0.050 0.200 8.500 0.395 3.525
Begel Lapangan. 8 Kg 28.203 28.203 1.700 8.000 1.050 0.050 0.200 8.500 0.395 3.525
2 Tulangan Atas. 10 Kg 28.505 28.505 3.800 6.000 3.850 0.050 2.000 0.617 4.751
Tulangan Bawah. 10 Kg 28.505 28.505 3.800 6.000 3.850 0.050 2.000 0.617 4.751
Begel Tumpuan. 8 Kg 23.641 23.641 1.900 6.000 1.050 0.050 0.200 9.500 0.395 3.940
Begel Lapangan. 8 Kg 23.641 23.641 1.900 6.000 1.050 0.050 0.200 9.500 0.395 3.940
3 Tulangan Atas. 10 Kg 9.008 9.008 3.600 2.000 3.650 0.050 2.000 0.617 4.504
Tulangan Bawah. 10 Kg 9.008 9.008 3.600 2.000 3.650 0.050 2.000 0.617 4.504
Begel Tumpuan. 8 Kg 7.466 7.466 1.800 2.000 1.050 0.050 0.200 9.000 0.395 3.733
Begel Lapangan. 8 Kg 7.466 7.466 1.800 2.000 1.050 0.050 0.200 9.000 0.395 3.733
4 Tulangan Atas. 10 Kg 61.762 61.762 3.800 13.000 3.850 0.050 2.000 0.617 4.751
Tulangan Bawah. 10 Kg 61.762 61.762 3.800 13.000 3.850 0.050 2.000 0.617 4.751
Begel Tumpuan. 8 Kg 51.222 51.222 1.900 13.000 1.050 0.050 0.200 9.500 0.395 3.940
Begel Lapangan. 8 Kg 51.222 51.222 1.900 13.000 1.050 0.050 0.200 9.500 0.395 3.940
Volume Keseluruhan Kg 487.729
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 8.160 8.160 3.400 0.300 0.000 8.000
2 M2 6.840 6.840 3.800 0.300 0.000 6.000
3 M2 2.160 2.160 3.600 0.300 0.000 2.000
4 M2 14.820 14.820 3.800 0.300 0.000 13.000
Volume Keseluruhan M2 31.980
8 Pekerjaan Balok 20/15 (K225)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.203 0.203 2.250 0.150 0.200 3.000
2 M3 0.093 0.093 3.100 0.150 0.200 1.000
3 M3 0.087 0.087 2.900 0.150 0.200 1.000
4 M3 0.038 0.038 1.250 0.150 0.200 1.000
5 M3 0.111 0.111 3.700 0.150 0.200 1.000
6 M3 0.168 0.168 2.800 0.150 0.200 2.000
7 M3 0.243 0.243 2.700 0.150 0.200 3.000
8 M3 0.037 0.037 1.225 0.150 0.200 1.000
9 M3 0.097 0.097 3.225 0.150 0.200 1.000
10 M3 0.071 0.071 1.185 0.150 0.200 2.000
11 M3 0.222 0.222 3.700 0.150 0.200 2.000
Volume Keseluruhan M3 1.369
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 12.521 12.521 2.250 3.000 2.350 0.100 2.000 0.888 4.174
Tulangan Bawah. 12 Kg 12.521 12.521 2.250 3.000 2.350 0.100 2.000 0.888 4.174
Begel Tumpuan. 8 Kg 9.332 9.332 1.125 3.000 1.050 0.050 0.150 7.500 0.395 3.111
Begel Lapangan. 8 Kg 9.332 9.332 1.125 3.000 1.050 0.050 0.150 7.500 0.395 3.111
2 Tulangan Atas. 12 Kg 5.683 5.683 3.100 1.000 3.200 0.100 2.000 0.888 5.683
Tulangan Bawah. 12 Kg 5.683 5.683 3.100 1.000 3.200 0.100 2.000 0.888 5.683
Begel Tumpuan. 8 Kg 4.286 4.286 1.550 1.000 1.050 0.050 0.150 10.333 0.395 4.286
Begel Lapangan. 8 Kg 4.286 4.286 1.550 1.000 1.050 0.050 0.150 10.333 0.395 4.286
3 Tulangan Atas. 12 Kg 5.328 5.328 2.900 1.000 3.000 0.100 2.000 0.888 5.328
Tulangan Bawah. 12 Kg 5.328 5.328 2.900 1.000 3.000 0.100 2.000 0.888 5.328
Begel Tumpuan. 8 Kg 4.009 4.009 1.450 1.000 1.050 0.050 0.150 9.667 0.395 4.009
Begel Lapangan. 8 Kg 4.009 4.009 1.450 1.000 1.050 0.050 0.150 9.667 0.395 4.009
4 Tulangan Atas. 12 Kg 2.398 2.398 1.250 1.000 1.350 0.100 2.000 0.888 2.398
Tulangan Bawah. 12 Kg 2.398 2.398 1.250 1.000 1.350 0.100 2.000 0.888 2.398
Begel Tumpuan. 8 Kg 1.728 1.728 0.625 1.000 1.050 0.050 0.150 4.167 0.395 1.728
Begel Lapangan. 8 Kg 1.728 1.728 0.625 1.000 1.050 0.050 0.150 4.167 0.395 1.728
5 Tulangan Atas. 12 Kg 6.749 6.749 3.700 1.000 3.800 0.100 2.000 0.888 6.749
Tulangan Bawah. 12 Kg 6.749 6.749 3.700 1.000 3.800 0.100 2.000 0.888 6.749
Begel Tumpuan. 8 Kg 5.115 5.115 1.850 1.000 1.050 0.050 0.150 12.333 0.395 5.115
Begel Lapangan. 8 Kg 5.115 5.115 1.850 1.000 1.050 0.050 0.150 12.333 0.395 5.115
6 Tulangan Atas. 12 Kg 10.301 10.301 2.800 2.000 2.900 0.100 2.000 0.888 5.150
Tulangan Bawah. 12 Kg 10.301 10.301 2.800 2.000 2.900 0.100 2.000 0.888 5.150
Begel Tumpuan. 8 Kg 7.742 7.742 1.400 2.000 1.050 0.050 0.150 9.333 0.395 3.871
Begel Lapangan. 8 Kg 7.742 7.742 1.400 2.000 1.050 0.050 0.150 9.333 0.395 3.871
7 Tulangan Atas. 12 Kg 14.918 14.918 2.700 3.000 2.800 0.100 2.000 0.888 4.973
Tulangan Bawah. 12 Kg 14.918 14.918 2.700 3.000 2.800 0.100 2.000 0.888 4.973
Begel Tumpuan. 8 Kg 11.198 11.198 1.350 3.000 1.050 0.050 0.150 9.000 0.395 3.733
Begel Lapangan. 8 Kg 11.198 11.198 1.350 3.000 1.050 0.050 0.150 9.000 0.395 3.733
8 Tulangan Atas. 12 Kg 2.353 2.353 1.225 1.000 1.325 0.100 2.000 0.888 2.353
Tulangan Bawah. 12 Kg 2.353 2.353 1.225 1.000 1.325 0.100 2.000 0.888 2.353
Begel Tumpuan. 8 Kg 1.694 1.694 0.613 1.000 1.050 0.050 0.150 4.083 0.395 1.694
Begel Lapangan. 8 Kg 1.694 1.694 0.613 1.000 1.050 0.050 0.150 4.083 0.395 1.694
9 Tulangan Atas. 12 Kg 5.905 5.905 3.225 1.000 3.325 0.100 2.000 0.888 5.905
Tulangan Bawah. 12 Kg 5.905 5.905 3.225 1.000 3.325 0.100 2.000 0.888 5.905
Begel Tumpuan. 8 Kg 4.459 4.459 1.613 1.000 1.050 0.050 0.150 10.750 0.395 4.459
Begel Lapangan. 8 Kg 4.459 4.459 1.613 1.000 1.050 0.050 0.150 10.750 0.395 4.459
10 Tulangan Atas. 12 Kg 4.564 4.564 1.185 2.000 1.285 0.100 2.000 0.888 2.282
Tulangan Bawah. 12 Kg 4.564 4.564 1.185 2.000 1.285 0.100 2.000 0.888 2.282
Begel Tumpuan. 8 Kg 3.277 3.277 0.593 2.000 1.050 0.050 0.150 3.950 0.395 1.638
Begel Lapangan. 8 Kg 3.277 3.277 0.593 2.000 1.050 0.050 0.150 3.950 0.395 1.638
11 Tulangan Atas. 12 Kg 13.498 13.498 3.700 2.000 3.800 0.100 2.000 0.888 6.749
Tulangan Bawah. 12 Kg 13.498 13.498 3.700 2.000 3.800 0.100 2.000 0.888 6.749
Begel Tumpuan. 8 Kg 10.231 10.231 1.850 2.000 1.050 0.050 0.150 12.333 0.395 5.115
Begel Lapangan. 8 Kg 10.231 10.231 1.850 2.000 1.050 0.050 0.150 12.333 0.395 5.115
Volume Keseluruhan Kg 294.575
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 3.713 3.713 2.250 0.550 0.000 3.000
2 M2 1.705 1.705 3.100 0.550 0.000 1.000
3 M2 1.595 1.595 2.900 0.550 0.000 1.000
4 M2 0.688 0.688 1.250 0.550 0.000 1.000
5 M2 2.035 2.035 3.700 0.550 0.000 1.000
6 M2 3.080 3.080 2.800 0.550 0.000 2.000
7 M2 4.455 4.455 2.700 0.550 0.000 3.000
8 M2 0.674 0.674 1.225 0.550 0.000 1.000
9 M2 1.774 1.774 3.225 0.550 0.000 1.000
10 M2 1.304 1.304 1.185 0.550 0.000 2.000
11 M2 4.070 4.070 3.700 0.550 0.000 2.000
Volume Keseluruhan M2 5.418
9 Pekerjaan Balok 15/12 (K200)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.098 0.098 5.430 0.120 0.150 1.000
Volume Keseluruhan M3 0.098
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 9.821 9.821 5.430 1.000 5.530 0.100 2.000 0.888 9.821
Tulangan Bawah. 12 Kg 9.821 9.821 5.430 1.000 5.530 0.100 2.000 0.888 9.821
Begel Tumpuan. 8 Kg 7.507 7.507 2.715 1.000 1.050 0.050 0.150 18.100 0.395 7.507
Begel Lapangan. 8 Kg 7.507 7.507 2.715 1.000 1.050 0.050 0.150 18.100 0.395 7.507
Volume Keseluruhan Kg 34.657
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 1.629 1.629 5.430 0.300 0.000 1.000
Volume Keseluruhan M2 1.629
10 Pekerjaan Balok 12/10 (K200)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.039 0.039 3.225 0.100 0.120 1.000
2 M3 0.198 0.198 8.250 0.100 0.120 2.000
3 M3 0.133 0.133 1.850 0.100 0.120 6.000
4 M3 0.310 0.310 3.225 0.100 0.120 8.000
5 M3 0.015 0.015 1.225 0.100 0.120 1.000
6 M3 0.125 0.125 2.600 0.100 0.120 4.000
7 M3 0.092 0.092 1.925 0.100 0.120 4.000
8 M3 0.133 0.133 3.700 0.100 0.120 3.000
9 M3 0.061 0.061 2.525 0.100 0.120 2.000
10 M3 0.018 0.018 1.470 0.100 0.120 1.000
11 M3 0.046 0.046 3.850 0.100 0.120 1.000
12 M3 0.022 0.022 1.800 0.100 0.120 1.000
13 M3 0.012 0.012 1.000 0.100 0.120 1.000
Volume Keseluruhan M3 1.203
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 10 Kg 4.041 4.041 3.225 1.000 3.275 0.050 2.000 0.617 4.041
Tulangan Bawah. 10 Kg 4.041 4.041 3.225 1.000 3.275 0.050 2.000 0.617 4.041
Begel Tumpuan. 6 Kg 1.879 1.879 1.613 1.000 1.050 0.050 0.200 8.063 0.222 1.879
Begel Lapangan. 6 Kg 1.879 1.879 1.613 1.000 1.050 0.050 0.200 8.063 0.222 1.879
2 Tulangan Atas. 10 Kg 20.484 20.484 8.250 2.000 8.300 0.050 2.000 0.617 10.242
Tulangan Bawah. 10 Kg 20.484 20.484 8.250 2.000 8.300 0.050 2.000 0.617 10.242
Begel Tumpuan. 6 Kg 9.615 9.615 4.125 2.000 1.050 0.050 0.200 20.625 0.222 4.808
Begel Lapangan. 6 Kg 9.615 9.615 4.125 2.000 1.050 0.050 0.200 20.625 0.222 4.808
3 Tulangan Atas. 10 Kg 14.068 14.068 1.850 6.000 1.900 0.050 2.000 0.617 2.345
Tulangan Bawah. 10 Kg 14.068 14.068 1.850 6.000 1.900 0.050 2.000 0.617 2.345
Begel Tumpuan. 6 Kg 6.469 6.469 0.925 6.000 1.050 0.050 0.200 4.625 0.222 1.078
Begel Lapangan. 6 Kg 6.469 6.469 0.925 6.000 1.050 0.050 0.200 4.625 0.222 1.078
4 Tulangan Atas. 10 Kg 32.331 32.331 3.225 8.000 3.275 0.050 2.000 0.617 4.041
Tulangan Bawah. 10 Kg 32.331 32.331 3.225 8.000 3.275 0.050 2.000 0.617 4.041
Begel Tumpuan. 6 Kg 15.035 15.035 1.613 8.000 1.050 0.050 0.200 8.063 0.222 1.879
Begel Lapangan. 6 Kg 15.035 15.035 1.613 8.000 1.050 0.050 0.200 8.063 0.222 1.879
5 Tulangan Atas. 10 Kg 1.573 1.573 1.225 1.000 1.275 0.050 2.000 0.617 1.573
Tulangan Bawah. 10 Kg 1.573 1.573 1.225 1.000 1.275 0.050 2.000 0.617 1.573
Begel Tumpuan. 6 Kg 0.714 0.714 0.613 1.000 1.050 0.050 0.200 3.063 0.222 0.714
Begel Lapangan. 6 Kg 0.714 0.714 0.613 1.000 1.050 0.050 0.200 3.063 0.222 0.714
6 Tulangan Atas. 10 Kg 13.080 13.080 2.600 4.000 2.650 0.050 2.000 0.617 3.270
Tulangan Bawah. 10 Kg 13.080 13.080 2.600 4.000 2.650 0.050 2.000 0.617 3.270
Begel Tumpuan. 6 Kg 6.061 6.061 1.300 4.000 1.050 0.050 0.200 6.500 0.222 1.515
Begel Lapangan. 6 Kg 6.061 6.061 1.300 4.000 1.050 0.050 0.200 6.500 0.222 1.515
7 Tulangan Atas. 10 Kg 9.749 9.749 1.925 4.000 1.975 0.050 2.000 0.617 2.437
Tulangan Bawah. 10 Kg 9.749 9.749 1.925 4.000 1.975 0.050 2.000 0.617 2.437
Begel Tumpuan. 6 Kg 4.487 4.487 0.963 4.000 1.050 0.050 0.200 4.813 0.222 1.122
Begel Lapangan. 6 Kg 4.487 4.487 0.963 4.000 1.050 0.050 0.200 4.813 0.222 1.122
8 Tulangan Atas. 10 Kg 13.883 13.883 3.700 3.000 3.750 0.050 2.000 0.617 4.628
Tulangan Bawah. 10 Kg 13.883 13.883 3.700 3.000 3.750 0.050 2.000 0.617 4.628
Begel Tumpuan. 6 Kg 6.469 6.469 1.850 3.000 1.050 0.050 0.200 9.250 0.222 2.156
Begel Lapangan. 6 Kg 6.469 6.469 1.850 3.000 1.050 0.050 0.200 9.250 0.222 2.156
9 Tulangan Atas. 10 Kg 6.355 6.355 2.525 2.000 2.575 0.050 2.000 0.617 3.178
Tulangan Bawah. 10 Kg 6.355 6.355 2.525 2.000 2.575 0.050 2.000 0.617 3.178
Begel Tumpuan. 6 Kg 2.943 2.943 1.263 2.000 1.050 0.050 0.200 6.313 0.222 1.471
Begel Lapangan. 6 Kg 2.943 2.943 1.263 2.000 1.050 0.050 0.200 6.313 0.222 1.471
10 Tulangan Atas. 10 Kg 1.876 1.876 1.470 1.000 1.520 0.050 2.000 0.617 1.876
Tulangan Bawah. 10 Kg 1.876 1.876 1.470 1.000 1.520 0.050 2.000 0.617 1.876
Begel Tumpuan. 6 Kg 0.857 0.857 0.735 1.000 1.050 0.050 0.200 3.675 0.222 0.857
Begel Lapangan. 6 Kg 0.857 0.857 0.735 1.000 1.050 0.050 0.200 3.675 0.222 0.857
11 Tulangan Atas. 10 Kg 4.813 4.813 3.850 1.000 3.900 0.050 2.000 0.617 4.813
Tulangan Bawah. 10 Kg 4.813 4.813 3.850 1.000 3.900 0.050 2.000 0.617 4.813
Begel Tumpuan. 6 Kg 2.244 2.244 1.925 1.000 1.050 0.050 0.200 9.625 0.222 2.244
Begel Lapangan. 6 Kg 2.244 2.244 1.925 1.000 1.050 0.050 0.200 9.625 0.222 2.244
12 Tulangan Atas. 10 Kg 2.283 2.283 1.800 1.000 1.850 0.050 2.000 0.617 2.283
Tulangan Bawah. 10 Kg 2.283 2.283 1.800 1.000 1.850 0.050 2.000 0.617 2.283
Begel Tumpuan. 6 Kg 1.049 1.049 0.900 1.000 1.050 0.050 0.200 4.500 0.222 1.049
Begel Lapangan. 6 Kg 1.049 1.049 0.900 1.000 1.050 0.050 0.200 4.500 0.222 1.049
13 Tulangan Atas. 10 Kg 1.296 1.296 1.000 1.000 1.050 0.050 2.000 0.617 1.296
Tulangan Bawah. 10 Kg 1.296 1.296 1.000 1.000 1.050 0.050 2.000 0.617 1.296
Begel Tumpuan. 6 Kg 0.583 0.583 0.500 1.000 1.050 0.050 0.200 2.500 0.222 0.583
Begel Lapangan. 6 Kg 0.583 0.583 0.500 1.000 1.050 0.050 0.200 2.500 0.222 0.583
Volume Keseluruhan Kg 368.468
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 0.774 0.774 3.225 0.240 0.000 1.000
2 M2 3.960 3.960 8.250 0.240 0.000 2.000
3 M2 2.664 2.664 1.850 0.240 0.000 6.000
4 M2 6.192 6.192 3.225 0.240 0.000 8.000
5 M2 0.294 0.294 1.225 0.240 0.000 1.000
6 M2 2.496 2.496 2.600 0.240 0.000 4.000
7 M2 1.848 1.848 1.925 0.240 0.000 4.000
8 M2 2.664 2.664 3.700 0.240 0.000 3.000
9 M2 1.212 1.212 2.525 0.240 0.000 2.000
10 M2 0.353 0.353 1.470 0.240 0.000 1.000
11 M2 0.924 0.924 3.850 0.240 0.000 1.000
12 M2 0.432 0.432 1.800 0.240 0.000 1.000
13 M2 0.240 0.240 1.000 0.240 0.000 1.000
Volume Keseluruhan M2 24.053
11 Pekerjaan Balok Utama 40/25 (K225)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 4.600 4.600 4.600 0.250 0.400 10.000
Volume Keseluruhan M3 4.600
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 87.024 87.024 4.600 10.000 4.900 0.300 2.000 0.888 8.702
Tulangan Tengah. 10 Kg 57.998 57.998 4.600 10.000 4.700 0.100 2.000 0.617 5.800
Tulangan Bawah. 12 Kg 83.472 83.472 4.600 10.000 4.700 0.100 2.000 0.888 8.347
Tulangan TumLap Kg 51.504 51.504 4.600 10.000 5.800 1.200 1.000 0.888 5.150
Tulangan Pinggang Kg 10.000
Begel Tumpuan. 8 Kg 122.648 122.648 2.300 10.000 1.350 0.050 0.100 23.000 0.395 12.265
Begel Lapangan. 8 Kg 61.324 61.324 2.300 10.000 1.350 0.050 0.200 11.500 0.395 6.132
Volume Keseluruhan Kg 463.969
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 46.000 46.000 4.600 1.000 0.000 10.000
Volume Keseluruhan M2 46.000
12 Pekerjaan Balok Utama 40/20 (K225)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 2.664 2.664 3.700 0.200 0.400 9.000
2 M3 0.696 0.696 2.900 0.200 0.400 3.000
3 M3 0.224 0.224 1.400 0.200 0.400 2.000
Volume Keseluruhan M3 2.664
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 63.936 63.936 3.700 9.000 4.000 0.300 2.000 0.888 7.104
Tulangan Tengah. 10 Kg 42.203 42.203 3.700 9.000 3.800 0.100 2.000 0.617 4.689
Tulangan Bawah. 12 Kg 60.739 60.739 3.700 9.000 3.800 0.100 2.000 0.888 6.749
Tulangan TumLap Kg 39.161 39.161 3.700 9.000 4.900 1.200 1.000 0.888 4.351
Tulangan Pinggang Kg 9.000
Begel Tumpuan. 8 Kg 69.056 69.056 1.850 9.000 1.050 0.050 0.100 18.500 0.395 7.673
Begel Lapangan. 8 Kg 34.528 34.528 1.850 9.000 1.050 0.050 0.200 9.250 0.395 3.836
2 Tulangan Atas. 12 Kg 17.050 17.050 2.900 3.000 3.200 0.300 2.000 0.888 5.683
Tulangan Tengah. 10 Kg 11.106 11.106 2.900 3.000 3.000 0.100 2.000 0.617 3.702
Tulangan Bawah. 12 Kg 15.984 15.984 2.900 3.000 3.000 0.100 2.000 0.888 5.328
Tulangan TumLap Kg 10.922 10.922 2.900 3.000 4.100 1.200 1.000 0.888 3.641
Tulangan Pinggang Kg 3.000
Begel Tumpuan. 8 Kg 18.042 18.042 1.450 3.000 1.050 0.050 0.100 14.500 0.395 6.014
Begel Lapangan. 8 Kg 9.021 9.021 1.450 3.000 1.050 0.050 0.200 7.250 0.395 3.007
3 Tulangan Atas. 12 Kg 6.038 6.038 1.400 2.000 1.700 0.300 2.000 0.888 3.019
Tulangan Tengah. 10 Kg 3.702 3.702 1.400 2.000 1.500 0.100 2.000 0.617 1.851
Tulangan Bawah. 12 Kg 5.328 5.328 1.400 2.000 1.500 0.100 2.000 0.888 2.664
Tulangan TumLap Kg 4.618 4.618 1.400 2.000 2.600 1.200 1.000 0.888 2.309
Tulangan Pinggang Kg 2.000
Begel Tumpuan. 8 Kg 3.871 3.871 0.700 2.000 1.050 0.050 0.150 4.667 0.395 1.936
Begel Lapangan. 8 Kg 3.871 3.871 0.700 2.000 1.050 0.050 0.150 4.667 0.395 1.936
Volume Keseluruhan Kg 419.175
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 29.970 29.970 3.700 0.900 0.000 9.000
M2 7.830 7.830 2.900 0.900 1.000 3.000
M2 2.520 2.520 1.400 0.900 2.000 2.000
Volume Keseluruhan M2 29.970
13 Pekerjaan Balok Anak 20/15 (K225)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.224 0.224 3.725 0.150 0.200 2.000
2 M3 0.225 0.225 3.750 0.150 0.200 2.000
3 M3 0.227 0.227 3.775 0.150 0.200 2.000
4 M3 0.180 0.180 3.000 0.150 0.200 2.000
5 M3 0.048 0.048 1.600 0.150 0.200 1.000
6 M3 0.045 0.045 1.500 0.150 0.200 1.000
7 M3 0.026 0.026 0.850 0.150 0.200 1.000
8 M3 0.027 0.027 0.900 0.150 0.200 1.000
9 M3 0.030 0.030 1.000 0.150 0.200 1.000
10 M3 0.128 0.128 1.425 0.150 0.200 3.000
11 M3 0.021 0.021 0.700 0.150 0.200 1.000
12 M3 0.399 0.399 3.325 0.150 0.200 4.000
13 M3 0.141 0.141 2.350 0.150 0.200 2.000
14 M3 0.072 0.072 2.400 0.150 0.200 1.000
15 M3 0.041 0.041 1.380 0.150 0.200 1.000
16 M3 0.066 0.066 2.200 0.150 0.200 1.000
17 M3 0.248 0.248 8.250 0.150 0.200 1.000
Volume Keseluruhan M3 2.147
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 13.586 13.586 3.725 2.000 3.825 0.100 2.000 0.888 6.793
Tulangan Bawah. 12 Kg 13.586 13.586 3.725 2.000 3.825 0.100 2.000 0.888 6.793
Begel Tumpuan. 8 Kg 7.357 7.357 1.863 2.000 0.750 0.050 0.150 12.417 0.395 3.678
Begel Lapangan. 8 Kg 7.357 7.357 1.863 2.000 0.750 0.050 0.150 12.417 0.395 3.678
2 Tulangan Atas. 12 Kg 13.675 13.675 3.750 2.000 3.850 0.100 2.000 0.888 6.838
Tulangan Bawah. 12 Kg 13.675 13.675 3.750 2.000 3.850 0.100 2.000 0.888 6.838
Begel Tumpuan. 8 Kg 7.406 7.406 1.875 2.000 0.750 0.050 0.150 12.500 0.395 3.703
Begel Lapangan. 8 Kg 7.406 7.406 1.875 2.000 0.750 0.050 0.150 12.500 0.395 3.703
3 Tulangan Atas. 12 Kg 13.764 13.764 3.775 2.000 3.875 0.100 2.000 0.888 6.882
Tulangan Bawah. 12 Kg 13.764 13.764 3.775 2.000 3.875 0.100 2.000 0.888 6.882
Begel Tumpuan. 8 Kg 7.456 7.456 1.888 2.000 0.750 0.050 0.150 12.583 0.395 3.728
Begel Lapangan. 8 Kg 7.456 7.456 1.888 2.000 0.750 0.050 0.150 12.583 0.395 3.728
4 Tulangan Atas. 12 Kg 11.011 11.011 3.000 2.000 3.100 0.100 2.000 0.888 5.506
Tulangan Bawah. 12 Kg 11.011 11.011 3.000 2.000 3.100 0.100 2.000 0.888 5.506
Begel Tumpuan. 8 Kg 5.925 5.925 1.500 2.000 0.750 0.050 0.150 10.000 0.395 2.963
Begel Lapangan. 8 Kg 5.925 5.925 1.500 2.000 0.750 0.050 0.150 10.000 0.395 2.963
5 Tulangan Atas. 12 Kg 3.019 3.019 1.600 1.000 1.700 0.100 2.000 0.888 3.019
Tulangan Bawah. 12 Kg 3.019 3.019 1.600 1.000 1.700 0.100 2.000 0.888 3.019
Begel Tumpuan. 8 Kg 1.580 1.580 0.800 1.000 0.750 0.050 0.150 5.333 0.395 1.580
Begel Lapangan. 8 Kg 1.580 1.580 0.800 1.000 0.750 0.050 0.150 5.333 0.395 1.580
6 Tulangan Atas. 12 Kg 2.842 2.842 1.500 1.000 1.600 0.100 2.000 0.888 2.842
Tulangan Bawah. 12 Kg 2.842 2.842 1.500 1.000 1.600 0.100 2.000 0.888 2.842
Begel Tumpuan. 8 Kg 1.481 1.481 0.750 1.000 0.750 0.050 0.150 5.000 0.395 1.481
Begel Lapangan. 8 Kg 1.481 1.481 0.750 1.000 0.750 0.050 0.150 5.000 0.395 1.481
7 Tulangan Atas. 12 Kg 1.687 1.687 0.850 1.000 0.950 0.100 2.000 0.888 1.687
Tulangan Bawah. 12 Kg 1.687 1.687 0.850 1.000 0.950 0.100 2.000 0.888 1.687
Begel Tumpuan. 8 Kg 0.839 0.839 0.425 1.000 0.750 0.050 0.150 2.833 0.395 0.839
Begel Lapangan. 8 Kg 0.839 0.839 0.425 1.000 0.750 0.050 0.150 2.833 0.395 0.839
8 Tulangan Atas. 12 Kg 1.776 1.776 0.900 1.000 1.000 0.100 2.000 0.888 1.776
Tulangan Bawah. 12 Kg 1.776 1.776 0.900 1.000 1.000 0.100 2.000 0.888 1.776
Begel Tumpuan. 8 Kg 0.889 0.889 0.450 1.000 0.750 0.050 0.150 3.000 0.395 0.889
Begel Lapangan. 8 Kg 0.889 0.889 0.450 1.000 0.750 0.050 0.150 3.000 0.395 0.889
9 Tulangan Atas. 12 Kg 1.954 1.954 1.000 1.000 1.100 0.100 2.000 0.888 1.954
Tulangan Bawah. 12 Kg 1.954 1.954 1.000 1.000 1.100 0.100 2.000 0.888 1.954
Begel Tumpuan. 8 Kg 0.988 0.988 0.500 1.000 0.750 0.050 0.150 3.333 0.395 0.988
Begel Lapangan. 8 Kg 0.988 0.988 0.500 1.000 0.750 0.050 0.150 3.333 0.395 0.988
10 Tulangan Atas. 12 Kg 8.125 8.125 1.425 3.000 1.525 0.100 2.000 0.888 2.708
Tulangan Bawah. 12 Kg 8.125 8.125 1.425 3.000 1.525 0.100 2.000 0.888 2.708
Begel Tumpuan. 8 Kg 4.222 4.222 0.713 3.000 0.750 0.050 0.150 4.750 0.395 1.407
Begel Lapangan. 8 Kg 4.222 4.222 0.713 3.000 0.750 0.050 0.150 4.750 0.395 1.407
11 Tulangan Atas. 12 Kg 1.421 1.421 0.700 1.000 0.800 0.100 2.000 0.888 1.421
Tulangan Bawah. 12 Kg 1.421 1.421 0.700 1.000 0.800 0.100 2.000 0.888 1.421
Begel Tumpuan. 8 Kg 0.691 0.691 0.350 1.000 0.750 0.050 0.150 2.333 0.395 0.691
Begel Lapangan. 8 Kg 0.691 0.691 0.350 1.000 0.750 0.050 0.150 2.333 0.395 0.691
12 Tulangan Atas. 12 Kg 24.331 24.331 3.325 4.000 3.425 0.100 2.000 0.888 6.083
Tulangan Bawah. 12 Kg 24.331 24.331 3.325 4.000 3.425 0.100 2.000 0.888 6.083
Begel Tumpuan. 8 Kg 13.134 13.134 1.663 4.000 0.750 0.050 0.150 11.083 0.395 3.283
Begel Lapangan. 8 Kg 13.134 13.134 1.663 4.000 0.750 0.050 0.150 11.083 0.395 3.283
13 Tulangan Atas. 12 Kg 8.702 8.702 2.350 2.000 2.450 0.100 2.000 0.888 4.351
Tulangan Bawah. 12 Kg 8.702 8.702 2.350 2.000 2.450 0.100 2.000 0.888 4.351
Begel Tumpuan. 8 Kg 4.641 4.641 1.175 2.000 0.750 0.050 0.150 7.833 0.395 2.321
Begel Lapangan. 8 Kg 4.641 4.641 1.175 2.000 0.750 0.050 0.150 7.833 0.395 2.321
14 Tulangan Atas. 12 Kg 4.440 4.440 2.400 1.000 2.500 0.100 2.000 0.888 4.440
Tulangan Bawah. 12 Kg 4.440 4.440 2.400 1.000 2.500 0.100 2.000 0.888 4.440
Begel Tumpuan. 8 Kg 2.370 2.370 1.200 1.000 0.750 0.050 0.150 8.000 0.395 2.370
Begel Lapangan. 8 Kg 2.370 2.370 1.200 1.000 0.750 0.050 0.150 8.000 0.395 2.370
15 Tulangan Atas. 12 Kg 2.628 2.628 1.380 1.000 1.480 0.100 2.000 0.888 2.628
Tulangan Bawah. 12 Kg 2.628 2.628 1.380 1.000 1.480 0.100 2.000 0.888 2.628
Begel Tumpuan. 8 Kg 1.363 1.363 0.690 1.000 0.750 0.050 0.150 4.600 0.395 1.363
Begel Lapangan. 8 Kg 1.363 1.363 0.690 1.000 0.750 0.050 0.150 4.600 0.395 1.363
16 Tulangan Atas. 12 Kg 4.085 4.085 2.200 1.000 2.300 0.100 2.000 0.888 4.085
Tulangan Bawah. 12 Kg 4.085 4.085 2.200 1.000 2.300 0.100 2.000 0.888 4.085
Begel Tumpuan. 8 Kg 2.173 2.173 1.100 1.000 0.750 0.050 0.150 7.333 0.395 2.173
Begel Lapangan. 8 Kg 2.173 2.173 1.100 1.000 0.750 0.050 0.150 7.333 0.395 2.173
17 Tulangan Atas. 12 Kg 14.830 14.830 8.250 1.000 8.350 0.100 2.000 0.888 14.830
Tulangan Bawah. 12 Kg 14.830 14.830 8.250 1.000 8.350 0.100 2.000 0.888 14.830
Begel Tumpuan. 8 Kg 8.147 8.147 4.125 1.000 0.750 0.050 0.150 27.500 0.395 8.147
Begel Lapangan. 8 Kg 8.147 8.147 4.125 1.000 0.750 0.050 0.150 27.500 0.395 8.147
Volume Keseluruhan Kg 405.075
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 2.980 2.980 3.725 0.400 0.000 2.000
2 M2 3.000 3.000 3.750 0.400 0.000 2.000
3 M2 3.020 3.020 3.775 0.400 0.000 2.000
4 M2 2.400 2.400 3.000 0.400 0.000 2.000
5 M2 0.640 0.640 1.600 0.400 0.000 1.000
6 M2 0.600 0.600 1.500 0.400 0.000 1.000
7 M2 0.340 0.340 0.850 0.400 0.000 1.000
8 M2 0.360 0.360 0.900 0.400 0.000 1.000
9 M2 0.400 0.400 1.000 0.400 0.000 1.000
10 M2 1.710 1.710 1.425 0.400 0.000 3.000
11 M2 0.280 0.280 0.700 0.400 0.000 1.000
12 M2 5.320 5.320 3.325 0.400 0.000 4.000
13 M2 1.880 1.880 2.350 0.400 0.000 2.000
14 M2 0.960 0.960 2.400 0.400 0.000 1.000
15 M2 0.552 0.552 1.380 0.400 0.000 1.000
16 M2 0.880 0.880 2.200 0.400 0.000 1.000
Volume Keseluruhan M2 25.322
14 Pekerjaan Balok Anak 20/12 (K225)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.206 0.206 8.600 0.120 0.200 1.000
2 M3 0.089 0.089 3.700 0.120 0.200 1.000
Volume Keseluruhan M3 0.295
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 10 Kg 21.348 21.348 8.600 1.000 8.650 0.050 4.000 0.617 21.348
Begel Lapangan. 8 Kg 11.720 11.720 8.600 1.000 0.690 0.050 0.200 43.000 0.395 11.720
2 Tulangan Atas. 10 Kg 9.255 9.255 3.700 1.000 3.750 0.050 4.000 0.617 9.255
Begel Lapangan. 8 Kg 5.042 5.042 3.700 1.000 0.690 0.050 0.200 18.500 0.395 5.042
Volume Keseluruhan Kg 47.365
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 4.300 4.300 8.600 0.500 0.000 1.000
2 M2 1.850 1.850 3.700 0.500 0.000 1.000
Volume Keseluruhan M2 6.150
15 Pekerjaan RingBalok 20/15 (K225)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.552 0.552 4.600 0.150 0.200 4.000
2 M3 0.261 0.261 2.900 0.150 0.200 3.000
3 M3 0.156 0.156 1.300 0.150 0.200 4.000
4 M3 0.225 0.225 2.500 0.150 0.200 3.000
5 M3 0.666 0.666 3.700 0.150 0.200 6.000
6 M3 0.246 0.246 8.200 0.150 0.200 1.000
Volume Keseluruhan M3 2.106
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 12 Kg 66.067 66.067 4.600 4.000 4.650 0.050 4.000 0.888 16.517
Begel Lapangan. 8 Kg 27.255 27.255 4.600 4.000 0.750 0.050 0.200 23.000 0.395 6.814
2 Tulangan Atas. 12 Kg 31.435 31.435 2.900 3.000 2.950 0.050 4.000 0.888 10.478
Begel Lapangan. 8 Kg 12.887 12.887 2.900 3.000 0.750 0.050 0.200 14.500 0.395 4.296
3 Tulangan Atas. 12 Kg 19.181 19.181 1.300 4.000 1.350 0.050 4.000 0.888 4.795
Begel Lapangan. 8 Kg 7.703 7.703 1.300 4.000 0.750 0.050 0.200 6.500 0.395 1.926
4 Tulangan Atas. 12 Kg 27.173 27.173 2.500 3.000 2.550 0.050 4.000 0.888 9.058
Begel Lapangan. 8 Kg 11.109 11.109 2.500 3.000 0.750 0.050 0.200 12.500 0.395 3.703
5 Tulangan Atas. 12 Kg 79.920 79.920 3.700 6.000 3.750 0.050 4.000 0.888 13.320
Begel Lapangan. 8 Kg 32.884 32.884 3.700 6.000 0.750 0.050 0.200 18.500 0.395 5.481
6 Tulangan Atas. 12 Kg 29.304 29.304 8.200 1.000 8.250 0.050 4.000 0.888 29.304
Begel Lapangan. 8 Kg 12.146 12.146 8.200 1.000 0.750 0.050 0.200 41.000 0.395 12.146
Volume Keseluruhan Kg 357.064
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 7.360 7.360 4.600 0.400 0.000 4.000
2 M2 3.480 3.480 2.900 0.400 0.000 3.000
3 M2 2.080 2.080 1.300 0.400 0.000 4.000
4 M2 3.000 3.000 2.500 0.400 0.000 3.000
5 M2 8.880 8.880 3.700 0.400 0.000 6.000
6 M2 3.280 3.280 8.200 0.400 0.000 1.000
Volume Keseluruhan M2 28.080
16 Pekerjaan RingBalok 15/15 (K200)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.128 0.128 1.420 0.150 0.150 4.000
2 M3 0.131 0.131 2.900 0.150 0.150 2.000
3 M3 0.102 0.102 0.650 0.150 0.150 7.000
4 M3 0.800 0.800 11.850 0.150 0.150 3.000
5 M3 0.675 0.675 10.000 0.150 0.150 3.000
6 M3 0.088 0.088 3.900 0.150 0.150 1.000
Volume Keseluruhan M3 1.923
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 10 Kg 14.512 14.512 1.420 4.000 1.470 0.050 4.000 0.617 3.628
Begel Lapangan. 8 Kg 7.292 7.292 1.420 4.000 0.650 0.050 0.200 7.100 0.395 1.823
2 Tulangan Atas. 10 Kg 14.561 14.561 2.900 2.000 2.950 0.050 4.000 0.617 7.281
Begel Lapangan. 8 Kg 7.446 7.446 2.900 2.000 0.650 0.050 0.200 14.500 0.395 3.723
3 Tulangan Atas. 10 Kg 12.093 12.093 0.650 7.000 0.700 0.050 4.000 0.617 1.728
Begel Lapangan. 8 Kg 5.841 5.841 0.650 7.000 0.650 0.050 0.200 3.250 0.395 0.834
4 Tulangan Atas. 10 Kg 88.108 88.108 11.850 3.000 11.900 0.050 4.000 0.617 29.369
Begel Lapangan. 8 Kg 45.637 45.637 11.850 3.000 0.650 0.050 0.200 59.250 0.395 15.212
5 Tulangan Atas. 10 Kg 74.410 74.410 10.000 3.000 10.050 0.050 4.000 0.617 24.803
Begel Lapangan. 8 Kg 38.513 38.513 10.000 3.000 0.650 0.050 0.200 50.000 0.395 12.838
6 Tulangan Atas. 10 Kg 9.749 9.749 3.900 1.000 3.950 0.050 4.000 0.617 9.749
Begel Lapangan. 8 Kg 5.007 5.007 3.900 1.000 0.650 0.050 0.200 19.500 0.395 5.007
Volume Keseluruhan Kg 323.168
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 1.704 1.704 1.420 0.300 0.000 4.000
2 M2 1.740 1.740 2.900 0.300 0.000 2.000
3 M2 1.365 1.365 0.650 0.300 0.000 7.000
4 M2 10.665 10.665 11.850 0.300 0.000 3.000
5 M2 9.000 9.000 10.000 0.300 0.000 3.000
6 M2 1.170 1.170 3.900 0.300 0.000 1.000
Volume Keseluruhan M2 25.644
17 Pekerjaan RingBalok 15/12 (K200)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 0.540 0.540 24.000 0.150 0.150 1.000
2 M3 0.270 0.270 12.000 0.150 0.150 1.000
3 M3 0.146 0.146 6.500 0.150 0.150 1.000
Volume Keseluruhan M3 0.956
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Atas. 10 Kg 59.972 59.972 24.000 1.000 24.300 0.300 4.000 0.617 59.972
Begel Lapangan. 6 Kg 17.316 17.316 24.000 1.000 0.650 0.050 0.200 120.000 0.222 17.316
2 Tulangan Atas. 10 Kg 30.356 30.356 12.000 1.000 12.300 0.300 4.000 0.617 30.356
Begel Lapangan. 6 Kg 8.658 8.658 12.000 1.000 0.650 0.050 0.200 60.000 0.222 8.658
3 Tulangan Atas. 10 Kg 16.782 16.782 6.500 1.000 6.800 0.300 4.000 0.617 16.782
Begel Lapangan. 6 Kg 4.690 4.690 6.500 1.000 0.650 0.050 0.200 32.500 0.222 4.690
Volume Keseluruhan Kg 137.775
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 6.000 6.000 24.000 0.250 0.000 1.000
2 M2 3.000 3.000 12.000 0.250 0.000 1.000
3 M2 1.625 1.625 6.500 0.250 0.000 1.000
Volume Keseluruhan M2 10.625
18 Pekerjaan Plat Lantai Bertulang T.12cm (K225)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 11.025 11.025 4.900 3.750 0.120 5.000
2 M3 1.764 1.764 4.900 3.000 0.120 1.000
3 M3 1.052 1.052 2.350 3.730 0.120 1.000
4 M3 0.396 0.396 1.100 3.000 0.120 1.000
Volume Keseluruhan M3 14.237
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Pokok Atas. Pasangan Pertama (X) 12 Kg 286.454 286.454 3.750 5.000 3.950 0.200 0.300 16.333 0.888 57.291
Tulangan Pokok Atas. Pasangan Pertama (Y) 12 Kg 283.050 283.050 4.900 5.000 5.100 0.200 0.300 12.500 0.888 56.610
Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 193.995 193.995 3.750 5.000 3.850 0.100 0.300 16.333 0.617 38.799
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 192.813 192.813 4.900 5.000 5.000 0.100 0.300 12.500 0.617 38.563
Tulangan Pokok Atas Tumpuan Pasangan Ketiga (X) 8 Kg 8.367 8.367 0.938 5.000 1.038 0.100 0.300 4.083 0.395 1.673
Tulangan Pokok Atas Tumpuan Pasangan Ketiga (Y) 8 Kg 8.178 8.178 1.225 5.000 1.325 0.100 0.300 3.125 0.395 1.636
Tulangan Atas Tumpuan Pasangan Keempat (X) 8 Kg 11.946 11.946 0.938 5.000 0.988 0.050 0.200 6.125 0.395 2.389
Tulangan Atas Tumpuan Pasangan Keempat (Y) 8 Kg 11.804 11.804 1.225 5.000 1.275 0.050 0.200 4.688 0.395 2.361
Tulangan Bawah Tumpuan Pasangan Kelima (X) 8 Kg 11.946 11.946 0.938 5.000 0.988 0.050 0.200 6.125 0.395 2.389
Tulangan Atas Tumpuan Pasangan Kelima (Y) 8 Kg 11.804 11.804 1.225 5.000 1.275 0.050 0.200 4.688 0.395 2.361
2 Tulangan Pokok Atas. Pasangan Pertama (X) 12 Kg 46.413 46.413 3.000 1.000 3.200 0.200 0.300 16.333 0.888 46.413
Tulangan Pokok Atas. Pasangan Pertama (Y) 12 Kg 45.288 45.288 4.900 1.000 5.100 0.200 0.300 10.000 0.888 45.288
Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 31.241 31.241 3.000 1.000 3.100 0.100 0.300 16.333 0.617 31.241
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 30.850 30.850 4.900 1.000 5.000 0.100 0.300 10.000 0.617 30.850
Tulangan Pokok Atas Tumpuan Pasangan Ketiga (X) 8 Kg 1.371 1.371 0.750 1.000 0.850 0.100 0.300 4.083 0.395 1.371
Tulangan Pokok Atas Tumpuan Pasangan Ketiga (Y) 8 Kg 1.308 1.308 1.225 1.000 1.325 0.100 0.300 2.500 0.395 1.308
Tulangan Atas Tumpuan Pasangan Keempat (X) 8 Kg 1.936 1.936 0.750 1.000 0.800 0.050 0.200 6.125 0.395 1.936
Tulangan Atas Tumpuan Pasangan Keempat (Y) 8 Kg 1.889 1.889 1.225 1.000 1.275 0.050 0.200 3.750 0.395 1.889
Tulangan Bawah Tumpuan Pasangan Kelima (X) 8 Kg 1.936 1.936 0.750 1.000 0.800 0.050 0.200 6.125 0.395 1.936
Tulangan Atas Tumpuan Pasangan Kelima (Y) 8 Kg 1.889 1.889 1.225 1.000 1.275 0.050 0.200 3.750 0.395 1.889
3 Tulangan Pokok Atas. Pasangan Pertama (X) 12 Kg 27.337 27.337 3.730 1.000 3.930 0.200 0.300 7.833 0.888 27.337
Tulangan Pokok Atas. Pasangan Pertama (Y) 12 Kg 28.154 28.154 2.350 1.000 2.550 0.200 0.300 12.433 0.888 28.154
Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 18.511 18.511 3.730 1.000 3.830 0.100 0.300 7.833 0.617 18.511
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 18.795 18.795 2.350 1.000 2.450 0.100 0.300 12.433 0.617 18.795
Tulangan Pokok Atas Tumpuan Pasangan Ketiga (X) 8 Kg 0.799 0.799 0.933 1.000 1.033 0.100 0.300 1.958 0.395 0.799
Tulangan Pokok Atas Tumpuan Pasangan Ketiga (Y) 8 Kg 0.844 0.844 0.588 1.000 0.688 0.100 0.300 3.108 0.395 0.844
Tulangan Atas Tumpuan Pasangan Keempat (X) 8 Kg 1.140 1.140 0.933 1.000 0.983 0.050 0.200 2.938 0.395 1.140
Tulangan Atas Tumpuan Pasangan Keempat (Y) 8 Kg 1.174 1.174 0.588 1.000 0.638 0.050 0.200 4.663 0.395 1.174
Tulangan Bawah Tumpuan Pasangan Kelima (X) 8 Kg 1.140 1.140 0.933 1.000 0.983 0.050 0.200 2.938 0.395 1.140
Tulangan Atas Tumpuan Pasangan Kelima (Y) 8 Kg 1.174 1.174 0.588 1.000 0.638 0.050 0.200 4.663 0.395 1.174
4 Tulangan Pokok Atas. Pasangan Pertama (X) 12 Kg 15.629 15.629 3.000 1.000 3.200 0.200 0.200 5.500 0.888 15.629
Tulangan Pokok Atas. Pasangan Pertama (Y) 12 Kg 17.316 17.316 1.100 1.000 1.300 0.200 0.200 15.000 0.888 17.316
Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 10.859 10.859 3.000 1.000 3.200 0.200 0.200 5.500 0.617 10.859
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 12.032 12.032 1.100 1.000 1.300 0.200 0.200 15.000 0.617 12.032
Volume Keseluruhan Kg 1339.378
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 91.875 91.875 4.900 3.750 1.000 5.000
2 M2 14.700 14.700 4.900 3.000 1.000 1.000
3 M2 8.766 8.766 2.350 3.730 1.000 1.000
4 M2 3.300 3.300 1.100 3.000 1.000 1.000
Volume Keseluruhan M2 118.641
19 Pekerjaan Dak Beton Atap T.10cm (K200)
a Pekerjaan Beton Sat Vkes V P L T J
1 M3 1.330 1.330 3.500 3.800 0.100 1.000
2 M3 0.672 0.672 1.200 5.600 0.100 1.000
3 M3 3.960 3.960 3.600 11.000 0.100 1.000
4 M3 0.878 0.878 1.350 6.500 0.100 1.000
5 M3 2.040 2.040 12.000 1.700 0.100 1.000
6 M3 0.935 0.935 0.850 11.000 0.100 1.000
7 M3 0.660 0.660 12.000 0.550 0.100 1.000
Volume Keseluruhan M3 10.475
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
1 Tulangan Pokok Atas. Pasangan Pertama (X) 12 Kg 60.606 60.606 3.800 1.000 3.900 0.100 0.200 17.500 0.888 60.606
Tulangan Pokok Atas. Pasangan Pertama (Y) 12 Kg 60.739 60.739 3.500 1.000 3.600 0.100 0.200 19.000 0.888 60.739
Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 42.110 42.110 3.800 1.000 3.900 0.100 0.200 17.500 0.617 42.110
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 42.203 42.203 3.500 1.000 3.600 0.100 0.200 19.000 0.617 42.203
2 Tulangan Pokok Atas. Pasangan Pertama (X) 12 Kg 30.370 30.370 5.600 1.000 5.700 0.100 0.200 6.000 0.888 30.370
Tulangan Pokok Atas. Pasangan Pertama (Y) 12 Kg 32.323 32.323 1.200 1.000 1.300 0.100 0.200 28.000 0.888 32.323
Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 21.101 21.101 5.600 1.000 5.700 0.100 0.200 6.000 0.617 21.101
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 22.459 22.459 1.200 1.000 1.300 0.100 0.200 28.000 0.617 22.459
3 Tulangan Pokok Atas. Pasangan Pertama (X) 12 Kg 177.422 177.422 11.000 1.000 11.100 0.100 0.200 18.000 0.888 177.422
Tulangan Pokok Atas. Pasangan Pertama (Y) 12 Kg 180.708 180.708 3.600 1.000 3.700 0.100 0.200 55.000 0.888 180.708
Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 123.277 123.277 11.000 1.000 11.100 0.100 0.200 18.000 0.617 123.277
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 125.560 125.560 3.600 1.000 3.700 0.100 0.200 55.000 0.617 125.560
4 Tulangan Pokok Atas. Pasangan Pertama (X) 12 Kg 39.560 39.560 6.500 1.000 6.600 0.100 0.200 6.750 0.888 39.560
Tulangan Pokok Atas. Pasangan Pertama (Y) 12 Kg 41.847 41.847 1.350 1.000 1.450 0.100 0.200 32.500 0.888 41.847
Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 27.487 27.487 6.500 1.000 6.600 0.100 0.200 6.750 0.617 27.487
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 29.076 29.076 1.350 1.000 1.450 0.100 0.200 32.500 0.617 29.076
5 Tulangan Pokok Atas. Pasangan Pertama (X) 12 Kg 95.904 95.904 1.700 1.000 1.800 0.100 0.200 60.000 0.888 95.904
Tulangan Pokok Atas. Pasangan Pertama (Y) 12 Kg 91.331 91.331 12.000 1.000 12.100 0.100 0.200 8.500 0.888 91.331
Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 66.636 66.636 1.700 1.000 1.800 0.100 0.200 60.000 0.617 66.636
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 63.458 63.458 12.000 1.000 12.100 0.100 0.200 8.500 0.617 63.458
6 Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 29.107 29.107 11.000 1.000 11.100 0.100 0.200 4.250 0.617 29.107
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 32.238 32.238 0.850 1.000 0.950 0.100 0.200 55.000 0.617 32.238
7 Tulangan Pkok Bawah Pasangan Kedua (X) 10 Kg 24.063 24.063 0.550 1.000 0.650 0.100 0.200 60.000 0.617 24.063
Tulangan Pokok Bawah Pasangan Kedua (Y) 10 Kg 20.531 20.531 12.000 1.000 12.100 0.100 0.200 2.750 0.617 20.531
Volume Keseluruhan Kg 1480.117
c Pekerjaan Bekisting Sat Vkes V P L T J
1 M2 13.300 13.300 3.500 3.800 0.000 1.000
2 M2 6.720 6.720 1.200 5.600 0.000 1.000
3 M2 39.600 39.600 3.600 11.000 0.000 1.000
4 M2 8.775 8.775 1.350 6.500 0.000 1.000
5 M2 20.400 20.400 12.000 1.700 0.000 1.000
6 M2 9.350 9.350 0.850 11.000 0.000 1.000
7 M2 6.600 6.600 12.000 0.550 0.000 1.000
Volume Keseluruhan M2 104.745
20 Pekerjaan Tangga (K225)
a Pekerjaan Beton Sat Vkes V P L T J
Tangga Bawah M3 0.600 0.600 4.000 1.000 0.150 1.000
Bordes M3 0.300 0.300 1.000 2.000 0.150 1.000
Tangga Atas M3 0.525 0.525 3.500 1.000 0.150 1.000
Volume Keseluruhan M3 1.425
b Pekerjaan Pembesian Sat Vkes V P L T J Panj. Besi Peng. Besi Jum.Besi B. Besi Vol. Besi Panj. Begel Peng Begel Jar. Begel Jum. Begel B.Besi Bgl Vol. Begel
Tulangan Pokok Bawah. Pasangan Pertama (A) 12 Kg 15.984 15.984 3.500 1.000 3.600 0.100 0.200 5.000 0.888 15.984
Tulangan Pokok Bawah Pasangan Pertama (B) 12 Kg 18.204 18.204 4.000 1.000 4.100 0.100 0.200 5.000 0.888 18.204
Tulangan Bordes Bawah. Pasangan Kedua (x) 12 Kg 9.324 9.324 2.000 1.000 2.100 0.100 0.200 5.000 0.888 9.324
Tulangan Bordes Bawah Pasangan Kedua (y) 12 Kg 9.768 9.768 1.000 1.000 1.100 0.100 0.200 10.000 0.888 9.768
Tulangan Tumpuan (X). Pasangan Ketiga (A) 12 Kg 15.984 15.984 3.500 1.000 3.600 0.100 0.200 5.000 0.888 15.984
Tulangan Tumpuan (X) Pasangan Ketiga (B) 12 Kg 18.204 18.204 4.000 1.000 4.100 0.100 0.200 5.000 0.888 18.204
Tulangan Tumpuan (Y). Pasangan Ketiga (A) 10 Kg 11.877 11.877 1.000 1.000 1.100 0.100 0.200 17.500 0.617 11.877
Tulangan Tumpuan (Y) Pasangan Ketiga (B) 10 Kg 13.574 13.574 1.000 1.000 1.100 0.100 0.200 20.000 0.617 13.574
Tulangan Bordes Atas. Pasangan Keempat (x) 10 Kg 6.479 6.479 2.000 1.000 2.100 0.100 0.200 5.000 0.617 6.479
Tulangan Pijakan Tangga (B) Kg 19.621 19.621 4.000 5.000 0.530 0.050 0.300 12.000 0.617 3.924
Tulangan Pijakan Tangga (A) Kg 17.986 17.986 3.500 5.000 0.530 0.050 0.300 11.000 0.617 3.597
Tulangan Pengikat Pijakan 8 Kg 4.815 4.815 1.000 1.000 0.530 0.050 0.300 23.000 0.395 4.815
Volume Keseluruhan Kg 161.819
c Pekerjaan Bekisting Sat Vkes V P L T J
Tangga Bawah M2 4.000 4.000 4.000 1.000 0.000 1.000
Bordes M2 2.000 2.000 1.000 2.000 0.000 1.000
Tangga Atas M2 3.500 3.500 3.500 1.000 0.000 1.000
Volume Keseluruhan M2 9.500
21 Pekerjaan Rabat Lantai (K100) Sat Vkes V P L T J
1 M3 0.915 0.915 5.730 2.280 0.070 1.000
2 M3 0.616 0.616 2.750 3.200 0.070 1.000
3 M3 0.320 0.320 1.430 3.200 0.070 1.000
4 M3 0.806 0.806 5.050 2.280 0.070 1.000
5 M3 0.534 0.534 1.430 5.330 0.070 1.000
6 M3 0.185 0.185 1.430 1.850 0.070 1.000
7 M3 0.178 0.178 1.430 1.780 0.070 1.000
8 M3 1.860 1.860 6.850 3.880 0.070 1.000
9 M3 0.337 0.337 1.850 2.600 0.070 1.000
10 M3 0.337 0.337 1.850 2.600 0.070 1.000
11 M3 0.554 0.554 1.480 5.350 0.070 1.000
12 M3 0.767 0.767 3.480 3.150 0.070 1.000
13 M3 1.058 1.058 4.800 3.150 0.070 1.000
14 M3 2.614 2.614 4.800 7.780 0.070 1.000
15 M3 0.185 0.185 1.430 1.850 0.070 1.000
16 M3 0.188 0.188 1.430 1.880 0.070 1.000
17 M3 0.550 0.550 2.000 3.930 0.070 1.000
18 M3 0.675 0.675 1.240 7.780 0.070 1.000
19 M3 0.158 0.158 2.250 0.070 1.000
20 M3 0.093 0.093 1.330 0.070 1.000
21 M3 0.371 0.371 5.300 0.070 1.000
22 M3 0.226 0.226 4.300 0.750 0.070 1.000
Volume Keseluruhan M3 13.528
I PEKERJAAN KUSEN
1 Pekerjaan Kusen PJ1 (1 Unit)
a Kusen Sat Vkes V P L T J
1 M 5.200 5.200 2.600 2.000
2 M 6.000 6.000 3.000 2.000
3 M 6.400 6.400 0.800 8.000
4 M 3.300 3.300 1.650 2.000
Volume Keseluruhan M 20.900
b Daun Pintu dan Jendela Sat Vkes V P L T J
1 M2 3.65 3.65 2.2000 0.8300 2.0000
Volume Keseluruhan M2 3.652
2 Pekerjaan Kusen PJ2 (2 Unit)
a Kusen Sat Vkes V P L T J
1 M 5.200 5.200 2.600 2.000
2 M 6.000 6.000 3.000 2.000
3 M 3.900 3.900 0.650 6.000
4 M 3.300 3.300 1.650 2.000
Volume Keseluruhan M 18.400
b Daun Pintu dan Jendela Sat Vkes V P L T J
1 M2 3.65 3.65 2.2000 0.8300 2.0000
Volume Keseluruhan M2 3.652
3 Pekerjaan Kusen P1 (2 Unit)
a Kusen Sat Vkes V P L T J
1 M 6.000 6.000 3.000 2.000
2 M 3.300 3.300 1.650 2.000
Volume Keseluruhan M 9.300
b Daun Pintu dan Jendela Sat Vkes V P L T J
1 M2 3.65 3.65 2.2000 0.8300 2.0000
Volume Keseluruhan M2 3.652
4 Pekerjaan Kusen P2 (7 Unit)
a Kusen Sat Vkes V P L T J
1 M 6.000 6.000 3.000 2.000
2 M 5.400 5.400 0.900 6.000
Volume Keseluruhan M 11.400
b Daun Pintu dan Jendela Sat Vkes V P L T J
1 M2 1.98 1.98 2.2000 0.9000 1.0000
Volume Keseluruhan M2 1.980
5 Pekerjaan Kusen P3 (3 Unit)
a Kusen Sat Vkes V P L T J
1 M 4.500 4.500 2.250 2.000
2 M 0.700 0.700 0.700 1.000
Volume Keseluruhan M 5.200
b Daun Pintu dan Jendela Sat Vkes V P L T J
1 M2 1.54 1.54 2.2000 0.7000 1.0000
Volume Keseluruhan M2 1.540
6 Pekerjaan Kusen P4 (6 Unit)
a Kusen Sat Vkes V P L T J
1 M 4.500 4.500 2.250 2.000
2 M 0.700 0.700 0.700 1.000
Volume Keseluruhan M 5.200
b Daun Pintu dan Jendela Sat Vkes V P L T J
1 M2 1.54 1.54 2.2000 0.7000 1.0000
Volume Keseluruhan M2 1.540
7 Pekerjaan Kusen J1 (5 Unit)
a Kusen Sat Vkes V P L T J
1 M 13.000 13.000 2.600 5.000
2 M 5.200 5.200 0.650 8.000
3 M 6.400 6.400 0.800 8.000
Volume Keseluruhan M 24.600
b Daun Pintu dan Jendela Sat Vkes V P L T J
1 M2 1.82 1.82 1.4000 0.6500 2.0000
M2 2.24 2.24 1.4000 0.8000 2.0000
Volume Keseluruhan M2 4.060
8 Pekerjaan Kusen J2 (2 Unit)
a Kusen Sat Vkes V P L T J
1 M 13.000 13.000 2.600 5.000
2 M 11.200 11.200 0.700 16.000
Volume Keseluruhan M 24.200
9 Pekerjaan Kusen J3 (2 Unit)
a Kusen Sat Vkes V P L T J
1 M 13.000 13.000 2.600 5.000
2 M 12.800 12.800 0.800 16.000
Volume Keseluruhan M 25.800
b Daun Pintu dan Jendela Sat Vkes V P L T J
1 M2 2.240 2.240 1.400 0.800 2.000
Volume Keseluruhan M2 2.240
10 Pekerjaan Kusen J4 (2 Unit)
a Kusen Sat Vkes V P L T J
1 M 6.750 6.750 2.250 3.000
2 M 3.600 3.600 0.600 6.000
Volume Keseluruhan M 10.350
11 Pekerjaan Kusen J5 (2 Unit)
a Kusen Sat Vkes V P L T J
1 M 7.000 7.000 0.700 10.000
M 14.000 14.000 1.400 10.000
M 4.000 4.000 0.400 10.000
2 M 29.800 29.800 7.450 4.000
Volume Keseluruhan M 54.800
12 Pekerjaan Kusen J6 (1 Unit)
a Kusen Sat Vkes V P L T J
1 M 13.000 13.000 2.600 5.000
2 M 12.800 12.800 0.800 16.000
Volume Keseluruhan M 25.800
13 Pekerjaan Kusen V1 (8 Unit)
a Kusen Sat Vkes V P L T J
1 M 1.100 1.100 0.550 2.000
2 M 1.200 1.200 0.600 2.000
Volume Keseluruhan M 2.300
J PEKERJAAN KUNCI DAN KACA
1 Pekerjaan Kaca Tebal 5mm
a Pekerjaan Kaca PJ1 Sat Vkes V P L T J
M2 1.12 1.12 0.700 0.800 2.000
M2 2.24 2.24 1.400 0.800 2.000
M2 0.48 0.48 0.300 0.800 2.000
M2 1.155 1.16 0.700 1.650 1.000
M2 2.356 2.36 0.950 0.620 4.000
Volume Keseluruhan M2 7.351
b Pekerjaan Kaca PJ2 Sat Vkes V P L T J
M2 0.91 0.91 0.700 0.650 2.000
M2 1.82 1.82 1.400 0.650 2.000
M2 0.39 0.39 0.300 0.650 2.000
M2 1.155 1.16 0.700 1.650 1.000
M2 2.356 2.36 0.950 0.620 4.000
M2 6.631
c Pekerjaan Kaca P1 Sat Vkes V P L T J
M2 1.155 1.16 0.700 1.650 1.000
M2 2.356 2.36 0.950 0.620 4.000
Volume Keseluruhan M2 3.511
d Pekerjaan Kaca P2 Sat Vkes V P L T J
M2 0.63 0.63 0.700 0.900 1.000
Volume Keseluruhan M2 0.630
g Pekerjaan Kaca J1 Sat Vkes V P L T J
M2 0.91 0.91 0.700 0.650 2.000
M2 1.12 1.12 0.700 0.800 2.000
M2 1.08 1.08 1.200 0.450 2.000
M2 1.44 1.44 1.200 0.600 2.000
M2 0.39 0.39 0.300 0.650 2.000
M2 0.48 0.48 0.300 0.800 2.000
Volume Keseluruhan M2 5.420
h Pekerjaan Kaca J2 Sat Vkes V P L T J
M2 2.24 2.24 0.700 0.800 4.000
M2 2.24 2.24 1.400 0.800 2.000
M2 0.96 0.96 0.300 0.800 4.000
M2 0.96 0.96 0.300 0.800 4.000
M2 1.44 1.44 1.200 0.600 2.000
Volume Keseluruhan M2 7.840
i Pekerjaan Kaca J3 Sat Vkes V P L T J
M2 1.47 1.47 0.700 0.700 3.000
M2 2.94 2.94 1.400 0.700 3.000
M2 0.63 0.63 0.300 0.700 3.000
Volume Keseluruhan M2 5.040
j Pekerjaan Kaca J4 Sat Vkes V P L T J
M2 0.84 0.84 0.700 0.600 2.000
M2 1.68 1.68 1.400 0.600 2.000
Volume Keseluruhan M2 2.520
k Pekerjaan Kaca J5 Sat Vkes V P L T J
M2 20.39 20.39 2.700 7.550 1.000
Volume Keseluruhan M2 20.385
l Pekerjaan Kaca J6 Sat Vkes V P L T J
M2 2.24 2.24 0.700 0.800 4.000
M2 4.48 4.48 1.400 0.800 4.000
M2 0.96 0.96 0.300 0.800 4.000
Volume Keseluruhan M2 7.680
m Pekerjaan Kaca V1 Sat Vkes V P L T J
M2 0.18 0.18 0.300 0.600 1.000
Volume Keseluruhan M2 0.180
Total Keseluruhan
Perhitungan Volume Baja Konvensional