II BAHAN PEREKAT
Semen (50Kg) Zak Rp 65,625.00
Semen (40Kg) Zak Rp 50,000.00
Semen PC Kg Rp 1,250.00
Semen Warna Kg Rp 5,000.00
MSP Zak Rp 150,000.00
MSP Kg Rp 5,500.00
semen grouting Kg Rp 65,000.00
Additive Ltr Rp 60,000.00
Kapur Padam m3 Rp 250,000.00
Kapur Sirih Kg Rp 2,500.00
Page 1
NO NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2018 URAIAN CATATAN
Besi Hollow (10x10x0,6)mm Lonjor Rp 30,000.00
Besi Hollow (10x10x0,6)mm m' Rp 5,000.00
Besi Hollow (20x20x1,60)mm - 6 m Lonjor Rp 80,000.00
Besi Hollow (20x20x1,60)mm - 6 m m' Rp 13,333.33
Besi Hollow (40x40 x3)mm - 6 m Lonjor Rp 210,000.00
Besi Hollow (40x40 x3)mm - 6 m m' Rp 35,000.00
Besi Hollow ( 50x50x3) mm Lonjor Rp 250,000.00
Besi Hollow ( 50x50x3) mm Kg Rp 38,000.00
Besi Hollo ( 100x50x2) mm m' Rp 68,333.33
Top Cross Rail - Heavy Dutty 0,70 mm (metal furing) m' Rp 15,000.00
Furring Channel -Fire Rated 0,50mm (metal furing) m' Rp 15,000.00
Connector Furing (metal furing) Buah Rp 1,500.00
Tutup Besi Tempa 60 x 60 cm Buah Rp 1,760,000.00
Tutup Besi Tempa 80 x 80 cm Buah Rp 2,475,000.00
Baja Ringan Profil C 75.0,75 Batang Rp 80,000.00
Baja Ringan Profil C 75.0,75 Kg Rp 15,000.00
Baja Ringan Profil C 75.0,80 Batang Rp 85,000.00
Baja Ringan Profil C 75.0,80 Kg Rp 15,000.00
Baja Ringan Profil C 75.1,00 Batang Rp 115,000.00
Baja Ringan Profil C 75.1,00 Kg Rp 15,000.00
Baja Ringan Reng 28.45 Batang Rp 30,000.00
Baja Ringan Reng 30.40 Batang Rp 32,000.00
Baja Ringan Reng 30.45 Batang Rp 34,000.00
Baja Ringan Reng 31.45 Batang Rp 35,000.00
Baja Ringan Reng 32.45 Batang Rp 36,000.00
Plat stainlessteel m2 Rp 520,833.33
IV BAHAN KAYU
Kayu Klas I (Jati ) m3 Rp 25,000,000.00
Kayu Klas II (Kamper ) m3 Rp 8,500,000.00
Kayu Klas III (Marenti, Keruing , Merbau ) m3 Rp 3,250,000.00
Kayu Klas IV (Sengon Laut, Sono ) m3 Rp 3,000,000.00
Dolken dia 8 s/d 10 cm m3 Rp 15,000.00
Papan kayu kamper m3 Rp 9,500,000.00
Kaso-kaso (5 × 7) cm kayu kamper m3 Rp 8,000,000.00
Reng (2 × 3) cm kayu kamper m3 Rp 7,500,000.00
Kaso-kaso (5 × 7) cm kayu meranti m3 Rp 2,750,000.00
Kaso-kaso (5 × 7) cm kayu meranti Btg Rp 32,500.00
Usuk (4x6) cm Kayu meranti m3 Rp 2,750,000.00
Kayu meranti (papan) m3 Rp 3,000,000.00
Balok kayu kamper m3 Rp 8,500,000.00
Bambu (P.600 cm) Btg Rp 10,000.00
Ijuk Kg Rp 6,000.00
Ijuk M3 Rp 50,000.00
Kawat Nyamuk Alumunium m2 Rp 25,000.00
Sealent Tube Rp 30,000.00
VI BAHAN PELAPIS :
Tripleks 3 mm (120x240)mm Lbr Rp 40,000.00
Tripleks 4 mm (120x240)mm Lbr Rp 60,000.00
Tripleks 6 mm (120x240)mm Lbr Rp 75,000.00
Tripleks 9 mm (120x240)mm Lbr Rp 125,000.00
Tripleks 12 mm Lbr Rp 150,000.00
Formica Lbr Rp 80,000.00
Plastik Aerator Lbr Rp 50,000.00
Page 2
NO NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2018 URAIAN CATATAN
VII BAHAN PERKERASAN , LANTAI & DINDING KERAMIK
Paving K - 500 m2 Rp 110,000.00
Stopper Uskup tebal 6 cm Buah Rp 4,000.00
Kanstin K-300 m1 Rp 50,000.00
Paving Block 6 cm natural m2 Rp 65,000.00
Paving Block 6 cm warna m2 Rp 75,000.00
Paving Block 8 cm natural m2 Rp 85,000.00
Paving Block 8 cm warna m2 Rp 100,000.00
Ubin granit tile (60x60) cm Bh Rp 80,000.00
Homogeneous Tile 60x60 ex Niro /Estilo: Elda, Carla m2 Rp 330,000.00
Keramik Lantai (11x11) cm (polos) buah Rp 12,000.00
Keramik Lantai (20x20) cm m2 Rp 55,000.00
Keramik Lantai (20x20) cm (Kasar) m2 Rp 45,000.00
Keramik Lantai (30x30) cm m2 Rp 60,000.00
Keramik Lantai (30x30) cm (warna) m2 Rp 50,000.00
Keramik Lantai (33x33) cm m2 Rp 70,000.00
Keramik Lantai (40x40) cm m2 Rp 65,000.00
Keramik Lantai (40x40) cm (warna) m2 Rp 57,000.00
Keramik Lantai (25x50) cm m2 Rp 100,000.00
Keramik Lantai (50x50) cm (warna) m2 Rp 72,000.00
Keramik Mozaik (30x30) cm m2 Rp 350,000.00
Plint Keramik (10x40) cm Buah Rp 15,000.00
Plint Keramik (10x60) cm Buah Rp 34,650.00
Plint Keramik (10x10)cm Buah Rp 13,500.00
Plint Keramik (5x20)cm Buah Rp 10,000.00
Step Nosing (10x20)cm Buah Rp 15,000.00
Step Nosing (10x30)cm Buah Rp 17,500.00
Step Nosing (10x40)cm Buah Rp 22,500.00
Plint Internal cove buah Rp 25,000.00
Keramik Rock Tile m2 Rp 100,000.00
Granite Rock Tile m2 Rp 250,000.00
Marmer (100x100) cm m2 Rp 500,000.00
Batu alam m2 Rp 120,000.00
Granit Lokal / Andesit m2 Rp 750,000.00
Tegel alur jalur tuna netra m2 Rp 200,000.00
Keramik Artistik m2 Rp 150,000.00
Teraso Polos Warna STD (30x30)cm m2 Rp 30,000.00
Teraso Polos Warna STD (30x30)cm Buah Rp 2,750.00
Teraso Polos Abu abu STD (30x30)cm m2 Rp 35,000.00
Teraso Polos Abu abu STD (30x30)cm Buah Rp 3,250.00
Teraso Polos Abu abu STD (20x20)cm m2 Rp 25,000.00
Teraso Polos Abu abu STD (20x20)cm Buah Rp 1,000.00
Teraso Motif (30x30)cm m2 Rp 32,500.00
Teraso Motif (30x30)cm Buah Rp 3,000.00
Granit (30x30)cm m2 Rp 240,000.00
Granit (30x30)cm Buah Rp 22,000.00
Granit (40x40)cm m2 Rp 280,000.00
Granit (40x40)cm Buah Rp 70,000.00
Granit (60x60)cm m2 Rp 275,000.00
Granit (60x60)cm Buah Rp 83,000.00
Marmer (60x120)cm m2 Rp 500,000.00
Marmer (60x120)cm Buah Rp 225,000.00
Marmer (60x60)cm m2 Rp 450,000.00
Marmer (60x60)cm Buah Rp 150,000.00
Marmer (40x40)cm m2 Rp 400,000.00
Marmer (40x40)cm Buah Rp 67,500.00
Page 3
NO NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2018 URAIAN CATATAN
Marmer (30x30)cm m2 Rp 400,000.00
Marmer (30x30)cm Buah Rp 65,000.00
Plint Ubin (10x20)cm bh Rp 3,500.00
Plint Ubin (10x30)cm bh Rp 5,000.00
Plint Ubin (10x40)cm bh Rp 6,000.00
Plint Ubin Warna (10x20)cm bh Rp 5,000.00
Plint Ubin Warna (10x30)cm bh Rp 6,000.00
Plint Ubin Warna (10x40)cm bh Rp 7,500.00
Plint Gnanit (10x30)cm bh Rp 15,000.00
Plint Gnanit (10x40)cm bh Rp 22,500.00
Plint Teralux Kerang (10x30)cm bh Rp 25,000.00
Plint Teralux Kerang (10x40)cm bh Rp 30,000.00
Plint Teralux Marmer (10x30)cm bh Rp 30,000.00
Plint Teralux Marmer (10x40)cm bh Rp 35,000.00
Plint Teralux Marmer (10x60)cm bh Rp 45,000.00
Lantai Vinyl Box Rp 350,000.00
Lantai Vinyl Buah Rp 7,500.00
Plint Vinyl 15x30 cm Buah Rp 4,000.00
Plint Vinyl profil 10 cm x 240 cm Batang Rp 150,000.00
Karpet Lantai m2 Rp 75,000.00
Underlayer m2 Rp 70,000.00
Parquet m2 Rp 150,000.00
Floor Hardener Kg Rp 10,000.00
Bata Keramik / Klinker m2 Rp 150,000.00
Page 4
NO NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2018 URAIAN CATATAN
IX BAHAN KACA
Krepyak Nako Buah Rp 50,000.00
Kaca Polos 3 mm m2 Rp 85,000.00
Kaca Polos 5 mm m2 Rp 120,000.00
Kaca Polos 8 mm m2 Rp 150,000.00
Kaca Polos 10 mm m2 Rp 185,000.00
Kaca Rayban Tebal 5 mm m2 Rp 150,000.00
Kaca Wireglassed 5 mm m2 Rp 350,000.00
Kaca Tempered 12 mm m2 Rp 750,000.00
XI BAHAN FINISHING :
Cat Dasar Tembok Kg Rp 40,000.00
Cat tembok (Interior) Kg Rp 60,000.00
Cat tembok (Exterior) Kg Rp 70,000.00
Cat tembok (Exterior) weathershield Kg Rp 80,000.00
Cat besi Kg Rp 65,000.00
Dempul Besi Kg Rp 35,000.00
Cat Anti Karat Kg Rp 75,000.00
Menie A kg Rp 22,500.00
Menie B kg Rp 20,000.00
Politur Liter Rp 75,000.00
Wood Filler Kg Rp 60,000.00
Vernis Liter Rp 70,000.00
Wood Stain Liter Rp 70,000.00
Sanding Sealer Liter Rp 75,000.00
Melamic Liter Rp 75,000.00
Teak Oil Liter Rp 45,000.00
Thinerr Liter Rp 25,000.00
Plamir Tembok Kg Rp 25,000.00
Minyak Begisting Liter Rp 5,000.00
Seal Tape Bh Rp 7,500.00
Amplas Lbr Rp 10,000.00
Kuwas / roll Bh Rp 25,000.00
Residu/Olie Bekas Liter Rp 5,000.00
Bensin Liter Rp 8,500.00
Solar Liter Rp 10,000.00
Minyak pelumas Liter Rp 35,000.00
Lem Kayu ex. Rajawali kg Rp 25,000.00
Lem Kayu ex. Fox kg Rp 30,000.00
Lem pipa PVC gel Tube Rp 10,000.00
Lem pipa PVC cair Kaleng Rp 30,000.00
Vertical Blind Standart m2 Rp 275,000.00
Vertical Blind Backout Deluxe m2 Rp 300,000.00
Vertical Blind Solar Screen m2 Rp 375,000.00
Wallpaper m Rp 75,000.00
Page 5
NO NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2018 URAIAN CATATAN
XII BAHAN SANITARI
Wastafel Rp 2,750,000.00
Closet jongkok Unit/Buah Rp 350,000.00
Closet duduk Tabung Ex Toto Unit/Buah Rp 2,500,000.00
Urinoir Unit/Buah Rp 2,850,000.00
Bak air fiberglas Unit/Buah Rp 450,000.00
Bak air fiberglas 1 m3 Unit/Buah Rp 750,000.00
Bak air Teraso Unit/Buah Rp 350,000.00
Jet shower Unit/Buah Rp 450,000.00
Shower Set Unit/Buah Rp 750,000.00
Floor drain PVC Buah Rp 25,000.00
Floor drain crome Buah Rp 325,000.00
Tempat Sabun Buah Rp 150,000.00
Bak Cuci Piring Teraso Buah Rp 500,000.00
Kitchenzink Unit/Buah Rp 500,000.00
Water Drain + Basket Buah Rp 150,000.00
Kran Air 1/2 " Crome Buah Rp 370,000.00
Kran Air 1/2 (besi) Buah Rp 25,000.00
Kran Air 1/2 (Plastik) Buah Rp 15,000.00
Kran Air 3/4 " Plastik Buah Rp 15,000.00
Kran Air 3/4 (besi) Buah Rp 35,000.00
Kran Angsa 1/2 " (Plastik) Buah Rp 50,000.00
Kran Angsa 1/2 " (Chrome) Buah Rp 150,000.00
Kran Air Panas/Dingin 1/2 " (Chrome) Buah Rp 250,000.00
Page 6
NO NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2018 URAIAN CATATAN
Pipa PVC 5" Type C Panjang 4 m Ljr Rp 257,000.00
Pipa PVC 6" Type C Panjang 4 m Ljr Rp 340,000.00
Pipa PVC D dia 30 cm m1 Rp 345,000.00
Pipa GalvanisDia 1/2 " Rp 145,000.00
Pipa GalvanisDia 3/4 " Rp 183,000.00
Pipa GalvanisDia 1 " m1 Rp 47,000.00
Pipa GalvanisDia 1,5" Ljr Rp 426,000.00
Pipa GalvanisDia 1,5" m1 Rp 71,000.00
Pipa GalvanisDia 2,5" m1 Rp 123,500.00
Stop kran dia 1" bh Rp 100,000.00
Klep diameter 3/4" bh Rp 50,000.00
Tangki air 1000 liter bh Rp 1,250,000.00
Tangki air 500 liter bh Rp 800,000.00
Pelampung otomatis bh Rp 350,000.00
Roof Drain Metal Bh Rp 150,000.00
Mesin Jet Pump kap.250 watt unt Rp 8,500,000.00
Mesin Pompa tekan kap. 150 watt unt Rp 1,500,000.00
Tandon Cor 1 m3 Buah Rp 2,750,000.00
Tandon Cor 2 m3 Buah Rp 3,500,000.00
Tandon Cor 3 m3 Buah Rp 4,750,000.00
Tandon Cor 4 m3 Buah Rp 6,000,000.00
Tandon Cor 5 m3 Buah Rp 7,250,000.00
Water Stop PVC 150 m' Rp 61,000.00
Water Stop PVC 200 m' Rp 81,000.00
Water Stop PVC 250 m' Rp 110,000.00
Penjaga jarak bekisting/spacer Buah Rp 1,500.00
Panel Beton Precast m Rp 400,000.00
Strorox-100 kg Rp 45,000.00
Box Culvert 1500 x 1500 bh Rp 9,000,000.00
U-Ditch Uk. 60x60x120 bh Rp 900,000.00
Cover U-Ditch Uk. 60x60x120 bh Rp 530,000.00
XV PERALATAN ELEKTRIKAL
Box panel PVC isi 4 MCB Buah Rp 350,000.00
MCB 10 Ampere Buah Rp 100,000.00
MCB 6 Ampere Buah Rp 100,000.00
MCB 4 A Buah Rp 85,000.00
MCB 2 Ampere Buah Rp 60,000.00
Kabel NYM 2 x 2,5 mm2 Buah Rp 10,000.00
Kabel NYM 3 x 2,5 mm2 Buah Rp 13,000.00
Kabel Telepon m1 Rp 18,000.00
Kabel UTP Cat 5 e m1 Rp 15,000.00
Kabel UTP Cat 6 e m1 Rp 17,500.00
Konektor RJ 45 Set Rp 50,000.00
Isolator Buah Rp 15,000.00
Saklar Tunggal Buah Rp 25,000.00
Saklar Ganda Buah Rp 30,000.00
Stop Kontak Buah Rp 30,000.00
Outlet TV Buah Rp 45,000.00
Outlet Telephone Buah Rp 45,000.00
Down light / PLC 13 W Buah Rp 75,000.00
Fitting Plafon Buah Rp 15,000.00
Fiting Gantung EX Broco Buah Rp 10,000.00
Lampu TL 2 x 18 watt grille Buah Rp 250,000.00
Lampu TL 2 x 36 watt grille Buah Rp 350,000.00
Kabel NYA 1.5 mm m1 Rp 2,500.00
Kabel NYA 1.5 mm (50m) m1 Rp 125,000.00
Kabel NYA 1.5 mm (100m) rool Rp 250,000.00
Kabel NYA 2 x 1.5 mm m1 Rp 5,000.00
Klem Kabel pack Rp 15,000.00
Kabel NYA 500 Volt 2 x 2,5 mm2 m' Rp 7,500.00
Pipa Pralon 5/8 Lonjor Rp 12,000.00
L Bow 5/8 Buah Rp 1,500.00
T Doos Pvc Buah Rp 3,500.00
Page 7
NO NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2018 URAIAN CATATAN
Page 8
NO NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2018 URAIAN CATATAN
B SEWA PERALATAN
Scafolding Set/Hari Rp 2,500.00
Welding set ( min 5 jam ) jam Rp 75,000.00
Mini Pile 25x25 m' Rp 160,000.00
Pemancangan pile m' Rp 75,000.00
Pemotongan kepala tiang pancang ttk Rp 100,000.00
C UPAH
1 Pekerja Oh Rp 82,500.00
2 Tukang Batu Oh Rp 95,000.00
3 Tukang Las konstruksi Oh Rp 95,000.00
4 Tukang Cat Oh Rp 95,000.00
5 Tukang Las biasa Oh Rp 95,000.00
6 Tukang alumunium Oh Rp 95,000.00
7 Tukang Kayu Oh Rp 95,000.00
8 Tukang besi Oh Rp 95,000.00
9 Kepala Tukang Oh Rp 105,000.00
10 Mandor Oh Rp 110,000.00
11 Operator jam Rp 13,125.00
12 Pembantu Operator jam Rp 10,312.50
13 Sopir/Driver jam Rp 13,125.00
14 Pembantu Sopir/Driver jam Rp 10,312.50
15 Mekanik jam Rp 13,125.00
16 Pembantu Mekanik jam Rp 10,312.50
17 Juru Ukur jam Rp 13,125.00
Page 9
ANALISA HARGA SATUAN PEKERJAAN
Page 10
2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.000 Rp 82,500.00 Rp 82,500.00
Tukang kayu L.02 OH 2.000 Rp 95,000.00 Rp 190,000.00
Kepala tukang L.03 OH 0.200 Rp 105,000.00 Rp 21,000.00
Mandor L.04 OH 0.050 Rp 110,000.00 Rp 5,500.00
JUMLAH TENAGA KERJA Rp 299,000.00
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.700 Rp 15,000.00 Rp 25,500.00
Kayu m3 0.210 Rp 2,750,000.00 Rp 577,500.00
Paku biasa Kg 0.300 Rp 17,500.00 Rp 5,250.00
Semen portland Kg 10.500 Rp 1,250.00 Rp 13,125.00
Pasir beton m3 0.030 Rp 250,000.00 Rp 7,500.00
Koral beton m3 0.050 Rp 275,000.00 Rp 13,750.00
Seng gelombang Lbr 1.500 Rp 65,000.00 Rp 97,500.00
Seng plat m' 0.250 Rp 150,000.00 Rp 37,500.00
JUMLAH HARGA BAHAN Rp 777,625.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) Rp 1,076,625.00
Page 11
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.500 Rp 82,500.00 Rp 41,250.00
Mandor L.04 OH 0.050 Rp 110,000.00 Rp 5,500.00
JUMLAH TENAGA KERJA Rp 46,750.00
B BAHAN
Page 12
A.A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.200 Rp 82,500.00 Rp 99,000.00
Tukang Batu L.02 OH 0.200 Rp 95,000.00 Rp 19,000.00
Kepala tukang L.03 OH 0.020 Rp 105,000.00 Rp 2,100.00
Mandor L.04 OH 0.060 Rp 110,000.00 Rp 6,600.00
JUMLAH TENAGA KERJA Rp 126,700.00
B BAHAN
semen portland kg 230.000 Rp 1,250.00 Rp 287,500.00
pasir beton kg 893.000 Rp 178.57 Rp 159,464.29
kerikil (maks 30 mm) kg 1,027.000 Rp 158.33 Rp 162,608.33
air Liter 200.000 Rp 150.00 Rp 30,000.00
JUMLAH HARGA BAHAN Rp 639,572.62
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) Rp 766,272.62
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 2.100 Rp 82,500.00 Rp 173,250.00
Tukang Batu L.02 OH 0.350 Rp 95,000.00 Rp 33,250.00
Kepala tukang L.03 OH 0.035 Rp 105,000.00 Rp 3,675.00
Mandor L.04 OH 0.105 Rp 110,000.00 Rp 11,550.00
JUMLAH TENAGA KERJA Rp 221,725.00
B BAHAN
semen portland kg 448.000 Rp 1,250.00 Rp 560,000.00
pasir beton kg 667.000 Rp 178.57 Rp 119,107.14
kerikil (maks 30 mm) kg 1,000.000 Rp 158.33 Rp 158,333.33
air Liter 215.000 Rp 150.00 Rp 32,250.00
JUMLAH HARGA BAHAN Rp 869,690.48
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) Rp 1,091,415.48
Page 13
A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.520 Rp 82,500.00 Rp 42,900.00
Tukang kayu L.02 OH 0.260 Rp 95,000.00 Rp 24,700.00
Kepala tukang L.03 OH 0.026 Rp 105,000.00 Rp 2,730.00
Mandor L.04 OH 0.026 Rp 110,000.00 Rp 2,860.00
JUMLAH TENAGA KERJA Rp 73,190.00
B BAHAN
Kayu kelas III m3 0.045 Rp 3,250,000.00 Rp 146,250.00
Paku 5 – 10 cm Kg 0.300 Rp 17,500.00 Rp 5,250.00
Minyak bekisting Liter 0.100 Rp 5,000.00 Rp 500.00
JUMLAH HARGA BAHAN Rp 152,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) Rp 225,190.00
Page 14
A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk plat lantai
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.660 Rp 82,500.00 Rp 54,450.00
Tukang kayu L.02 OH 0.330 Rp 95,000.00 Rp 31,350.00
Kepala tukang L.03 OH 0.033 Rp 105,000.00 Rp 3,465.00
Mandor L.04 OH 0.033 Rp 110,000.00 Rp 3,630.00
JUMLAH TENAGA KERJA Rp 92,895.00
B BAHAN
Kayu kelas III m3 0.040 Rp 3,250,000.00 Rp 130,000.00
Paku 5 cm – 12 cm Kg 0.400 Rp 17,500.00 Rp 7,000.00
Minyak bekisting Liter 0.200 Rp 5,000.00 Rp 1,000.00
Balok kayu kelas III m3 0.015 Rp 2,750,000.00 Rp 41,250.00
Multiplek tebal 12 mm Lbr 0.350 Rp 150,000.00 Rp 52,500.00
Dolken kayu ᴓ 8 -10cm –panj 4 m Batang 6.000 Rp 15,000.00 Rp 90,000.00
JUMLAH HARGA BAHAN Rp 321,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) Rp 414,645.00
Page 15
D Jumlah (A+B+C) Rp 13,510.00
Page 16
ANALISA PEKERJAAN
JENIS PEKERJAAN A ,4, 1, 1, 35 : 1 m1 Pekerjaan Beton Bertulang Kolom dan balok Praktis
A TENAGA
1 Pekerja L01 OH 0.180 Rp 82,500.00 Rp 14,850.00
2 Tukang Batu L02 OH 0.020 Rp 95,000.00 Rp 1,900.00
3 Tukang kayu L02 OH 0.020 Rp 95,000.00 Rp 1,900.00
4 Tukang Besi L02 OH 0.020 Rp 95,000.00 Rp 1,900.00
5 Kepala Tukang L03 OH 0.006 Rp 105,000.00 Rp 630.00
6 Mandor L04 OH 0.009 Rp 110,000.00 Rp 990.00
JUMLAH HARGA TENAGA Rp 22,170.00
B BAHAN
1 kayu kelas III m3 0.006 Rp 3,250,000.00 Rp 19,500.00
2 paku 5 - 10cm kg 0.010 Rp 17,500.00 Rp 175.00
3 minyak bekesting liter 0.200 Rp 5,000.00 Rp 1,000.00
4 besi beton ( polos / ulir ) kg 3.000 Rp 10,000.00 Rp 30,000.00
5 kawat bendreat kg 0.045 Rp 17,500.00 Rp 787.50
6 Portland Cement (PC) kg 6.000 Rp 1,250.00 Rp 7,500.00
7 Pasir Cor m3 0.060 Rp 250,000.00 Rp 15,000.00
8 Stenslah/batu pecah tangan 2/3 m3 0.009 Rp 275,000.00 Rp 2,475.00
JUMLAH HARGA BAHAN Rp 76,437.50
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
JENIS PEKERJAAN : 1 m2 pasangan bata merah tebal 1/2 bata, 1Pc : 3Ps
A TENAGA
1 Pekerja L01 OH 0.300 Rp 82,500.00 Rp 24,750.00
2 Tukang Batu L02 OH 0.150 Rp 95,000.00 Rp 14,250.00
3 Kepala Tukang L03 OH 0.015 Rp 105,000.00 Rp 1,575.00
4 Mandor L04 OH 0.015 Rp 110,000.00 Rp 1,650.00
JUMLAH HARGA TENAGA Rp 42,225.00
B BAHAN
1 Bata merah 5 x 11 x 22 cm bh 70.000 Rp 750.00 Rp 52,500.00
2 Semen portland kg 14.370 Rp 1,250.00 Rp 17,962.50
3 Pasir pasang m3 0.040 Rp 200,000.00 Rp 8,000.00
JUMLAH HARGA BAHAN Rp 78,462.50
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
JENIS PEKERJAAN : 1 m2 pasangan bata merah tebal 1/2 bata, 1Pc : 5Ps
A TENAGA
1 Pekerja L01 OH 0.300 Rp 82,500.00 Rp 24,750.00
2 Tukang Batu L02 OH 0.150 Rp 95,000.00 Rp 14,250.00
3 Kepala Tukang L03 OH 0.015 Rp 105,000.00 Rp 1,575.00
4 Mandor L04 OH 0.015 Rp 110,000.00 Rp 1,650.00
JUMLAH HARGA TENAGA Rp 42,225.00
B BAHAN
1 Bata merah 5 x 11 x 22 cm bh 70.000 Rp 750.00 Rp 52,500.00
2 Semen portland kg 9.680 Rp 1,250.00 Rp 12,100.00
3 Pasir pasang m3 0.045 Rp 200,000.00 Rp 9,000.00
JUMLAH HARGA BAHAN Rp 73,600.00
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
PEKERJAAN PLESTERAN
PEKERJAAN PLAFOND
PEKERJAAN PENGECATAN
JENIS PEKERJAAN A,4,7,1,10 : 1 m2 Cat Tembok Interior
A TENAGA
1 Pekerja L01 OH 0.020 Rp 82,500.00 Rp 1,650.00
2 Tukang Batu L02 OH 0.063 Rp 114,000.00 Rp 7,182.00
3 Kepala Tukang L03 OH 0.006 Rp 105,000.00 Rp 661.50
4 Mandor L04 OH 0.003 Rp 110,000.00 Rp 330.00
JUMLAH HARGA TENAGA Rp 9,823.50
B BAHAN
1 plamir kg 0.100 Rp 25,000.00 Rp 2,500.00
2 cat dasar kg 0.100 Rp 40,000.00 Rp 4,000.00
3 cat penutup kg 0.260 Rp 60,000.00 Rp 15,600.00
JUMLAH HARGA BAHAN Rp 22,100.00
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
PEKERJAAN SANITASI
JENIS PEKERJAAN A,4,6,2,17 : Pemasangan Cladding select SEAM III 0.55 BMT colourbond
A TENAGA
1 Pekerja OH 0.100 Rp 82,500.00 Rp 8,250.00
2 Tukang Atap OH 0.100 Rp 114,000.00 Rp 11,400.00
3 Kepala Tukang OH 0.010 Rp 105,000.00 Rp 1,050.00
4 Mandor OH 0.006 Rp 110,000.00 Rp 660.00
JUMLAH HARGA TENAGA Rp 21,360.00
B BAHAN
1 Cladding select SEAM III 0.55 BMT colourbond m2 1.100 Rp 350,000.00 Rp 385,000.00
2 Screw Bh 6.000 Rp 3,500.00 Rp 21,000.00
JUMLAH HARGA BAHAN Rp 406,000.00
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
C PERALATAN
Aspatt Mixing Plant jam 0.061 Rp 3,800,000.00 Rp 232,940.00
Sewa Wheel Leader 10-15 HP jam 0.042 Rp 482,502.00 Rp 20,313.33
Sewa Dump Truck 8-10 m3 jam 0.543 Rp 65,000.00 Rp 35,288.50
Sewa Asphatt Finisher jam 0.077 Rp 856,725.00 Rp 65,710.81
Sewa Todem Roller jam 0.048 Rp 223,436.00 Rp 10,635.55
Sewa Tire Roller jam 0.036 Rp 226,360.00 Rp 8,058.42
Sewa Alat Bantu jam 1.000 Rp 1,000.00 Rp 1,000.00
JUMLAH HARGA PERALATAN Rp 373,946.61
B - II PEKERJAAN PONDASI
1 Mob- Demobilisasi Ls 1.00 Rp 45,000,000.00 Rp 45,000,000.00
2 Supply Tiang Pancang 250x250 mm m' 786.00 Rp 160,000.00 Rp 125,760,000.00
3 Pemancangan m' 786.00 Rp 75,000.00 Rp 58,950,000.00
4 Potong Kepala tiang titik 57.00 Rp 100,000.00 Rp 5,700,000.00
2 PC-2
- Lantai kerja B0 m3 0.23 Rp 766,272.62 Rp 176,242.70
- Beton f'c 25 m3 2.95 Rp 1,006,085.48 Rp 2,967,952.15
- Besi U - 24 kg 9.62 Rp 13,510.00 Rp 129,966.20
- Besi U - 40 kg 2,411.19 Rp 13,510.00 Rp 32,575,176.90
- Bekisting Bataco m2 13.68 Rp 133,200.00 Rp 1,822,176.00
II SLOOF
1 SL-40
- Lantai kerja B0 m3 0.04 Rp 766,272.62 Rp 30,650.90
- Beton f'c 25 m3 0.37 Rp 1,006,085.48 Rp 372,251.63
- Besi U - 24 kg 42.30 Rp 13,510.00 Rp 571,473.00
- Besi U - 40 kg 33.57 Rp 13,510.00 Rp 453,530.70
- Bekisting Bataco m2 3.50 Rp 133,200.00 Rp 466,200.00
2 SL-55A
- Lantai kerja B0 m3 0.97 Rp 766,272.62 Rp 743,284.44
- Beton f'c 25 m3 11.17 Rp 1,006,085.48 Rp 11,237,974.77
- Besi U - 24 kg 567.80 Rp 13,510.00 Rp 7,670,978.00
- Besi U - 40 kg 824.89 Rp 13,510.00 Rp 11,144,263.90
- Bekisting Bataco m2 38.69 Rp 133,200.00 Rp 5,153,508.00
3 SL-60A
- Lantai kerja B0 m3 0.57 Rp 766,272.62 Rp 436,775.39
- Beton f'c 25 m3 7.24 Rp 1,006,085.48 Rp 7,284,058.85
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
VI KOLOM
1 KOLOM K-450
- Beton f'c 25 m3 1.70 Rp 1,006,085.48 Rp 1,710,345.31
- Besi U - 40 kg 530.46 Rp 13,510.00 Rp 7,166,514.60
- Bekisting multiplek 12 mm ( expose ) m2 18.00 Rp 354,678.00 Rp 6,384,204.00
2 KOLOM K-500
- Beton f'c 25 m3 0.38 Rp 1,006,085.48 Rp 382,312.48
- Besi U - 40 kg 130.28 Rp 13,510.00 Rp 1,760,082.80
- Bekisting multiplek 12 mm ( expose ) m2 3.84 Rp 354,678.00 Rp 1,361,963.52
LANTAI 2 (+ 4,35 M)
V TANGGA
- Beton f'c 25 m3 2.77 Rp 1,006,085.48 Rp 2,786,856.77
- Besi U - 24 kg 250.98 Rp 13,510.00 Rp 3,390,739.80
- Besi U - 40 kg 209.98 Rp 13,510.00 Rp 2,836,829.80
- Bekisting multiplek 12 mm ( expose ) m2 19.68 Rp 323,145.00 Rp 6,359,493.60
B - IV PEKERJAAN BAJA
1 KOLOM BAJA
- Kolom WF 400.200.8.13 kg 536.58 Rp 24,845.00 Rp 13,331,330.10
- Kolom WF 350.175.7.11 kg 3,942.87 Rp 24,845.00 Rp 97,960,605.15
- Kolom WF 200.100.5,5.8 kg 1,457.69 Rp 24,845.00 Rp 36,216,308.05
2 RANGKA KUDA-KUDA
- Rafter + Voute WF 250.125.6.9 kg 2,121.84 Rp 24,845.00 Rp 52,717,114.80
- Konsol + Voute WF 200.100.5,5.8 kg 147.92 Rp 24,845.00 Rp 3,675,072.40
3 Balok
- Balok Castela 525.175.7.11 kg 1,019.28 Rp 24,845.00 Rp 25,324,011.60
- Balok Castela 450.150.6,5.9 kg 2,091.53 Rp 24,845.00 Rp 51,964,062.85
- Balok WF 350.175.7.11 kg 2,774.19 Rp 24,845.00 Rp 68,924,750.55
- Balok WF 300.150.6,5.9 kg 427.17 Rp 24,845.00 Rp 10,613,038.65
- Balok WF 250.125.6.9 kg 1,518.36 Rp 24,845.00 Rp 37,723,654.20
- WF 200.100.5,5.8 kg 610.99 Rp 24,845.00 Rp 15,180,046.55
4 Dudukan Rangka Cladding UNP 150.75.6,5.10 kg 1,075.20 Rp 24,405.00 Rp 26,240,256.00
5 Gording C 150.65.20.2,3 kg 1,386.00 Rp 24,130.00 Rp 33,444,180.00
6 Rangka Cladding C 150.65.20.2,3 kg 1,873.62 Rp 24,130.00 Rp 45,210,450.60
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
C - II PEKERJAAN PONDASI
1 Supply Tiang Pancang 250x250 mm m' 632.00 Rp 160,000.00 Rp 101,120,000.00
2 Pemancangan m' 632.00 Rp 75,000.00 Rp 47,400,000.00
3 Potong Kepala tiang titik 48.00 Rp 100,000.00 Rp 4,800,000.00
II RETAINING WALL
1 RETAINING WALL 8
- Lantai kerja B0 m3 1.89 Rp 766,272.62 Rp 1,448,255.25
- Beton f'c 25 m3 11.78 Rp 1,006,085.48 Rp 11,851,686.91
- Besi U - 40 kg 1,134.03 Rp 13,510.00 Rp 15,320,745.30
- Bekisting multiplek 12 mm ( expose ) m2 141.09 Rp 351,495.00 Rp 49,592,429.55
III SLOOF
1 SL-40 A
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
IV KOLOM
1 KOLOM K-450
- Beton f'c 25 m3 3.40 Rp 1,006,085.48 Rp 3,420,690.62
- Besi U - 40 kg 530.46 Rp 13,510.00 Rp 7,166,514.60
- Bekisting multiplek 12 mm ( expose ) m2 36.00 Rp 354,678.00 Rp 12,768,408.00
SUB TOTAL PEKERJAAN C-III Rp 559,994,457.78
C - IV PEKERJAAN BAJA
1 KOLOM BAJA
- Kolom WF 350.175.7.11 kg 9,725.77 Rp 24,845.00 Rp 241,636,755.65
- Kolom WF 300.150.6,5.9 kg 447.15 Rp 24,845.00 Rp 11,109,441.75
2 RANGKA KUDA-KUDA
- Rafter Castela 450.150.6,5.9 (WF 300.150.6,5.9) kg - Rp 24,845.00 Rp -
- Voute WF 300.150.6,5.9 kg - Rp 24,845.00 Rp -
- Rafter WF 250.125.6.9 kg 147.92 Rp 24,845.00 Rp 3,675,072.40
- Voute WF 250.125.6.9 kg 504.40 Rp 24,845.00 Rp 12,531,818.00
- Rafter WF 200.100.5,5.8 kg 512.00 Rp 24,845.00 Rp 12,720,640.00
- Voute WF 200.100.5,5.8 kg 256.00 Rp 24,845.00 Rp 6,360,320.00
3 Tiebeam WF 200.100.5,5.8 kg 5,120.00 Rp 24,845.00 Rp 127,206,400.00
4 Dudukan Rangka Cladding UNP 150.75.6,5.10 kg 465.18 Rp 24,405.00 Rp 11,352,717.90
5 Gording C 150.65.20.2,3 kg 7,630.46 Rp 24,130.00 Rp 184,122,999.80
6 Rangka Cladding C 150.65.20.2,3 kg 4,349.42 Rp 24,130.00 Rp 104,951,504.60
7 Rangka Listplank C 100.50.20.2,3 kg 2,150.93 Rp 24,130.00 Rp 51,901,940.90
9 Bracing Kolom L 60.60.6 kg 865.03 Rp 23,915.00 Rp 20,687,192.45
10 Penggantung Talang L 40.40.4 kg 222.64 Rp 23,915.00 Rp 5,324,435.60
11 Penggantung Talang Datar Plat Strip 40.4 kg 205.63 Rp 24,730.00 Rp 5,085,229.90
12 Begel talang turun plat strip 3x30 mm per jarak 1.50 m kg 38.22 Rp 24,730.00 Rp 945,180.60
14 Plat baja t= 12 mm kg 186.10 Rp 24,730.00 Rp 4,602,253.00
15 Plat baja t= 10 mm kg 741.94 Rp 24,730.00 Rp 18,348,176.20
16 Plat baja t= 8 mm kg 415.56 Rp 24,730.00 Rp 10,276,798.80
17 Plat baja t= 6 mm kg 175.17 Rp 24,730.00 Rp 4,331,954.10
18 Angkur Æ 19 mm ; L= 760 - U-50 bh 92.00 Rp 45,000.00 Rp 4,140,000.00
19 Angkur Æ 16 mm ; L= 650 - U-50 bh 12.00 Rp 40,000.00 Rp 480,000.00
20 Murbaut Æ 12 mm bh 824.00 Rp 7,500.00 Rp 6,180,000.00
21 Murbaut Æ 16 mm - A325 bh 318.00 Rp 12,500.00 Rp 3,975,000.00
22 Murbaut Æ 19 mm - A325 bh 310.00 Rp 15,000.00 Rp 4,650,000.00
23 Trekstang Æ 12 mm bh 396.00 Rp 22,500.00 Rp 8,910,000.00
24 Ikatan angin Æ 16 mm bh 46.00 Rp 250,000.00 Rp 11,500,000.00
25 Jarum keras Æ 16 mm bh 46.00 Rp 25,000.00 Rp 1,150,000.00
26 Sandblasting - Standart SA 2.5 kg 34,159.52 Rp 2,547.26 Rp 87,013,249.28
27 Cat baja Epoxy t=150 mikron kg 34,159.52 Rp 1,956.49 Rp 66,832,633.25
D - II PEKERJAAN PONDASI
2 Supply Tiang Pancang 250x250 mm m' 704.00 Rp 160,000.00 Rp 112,640,000.00
3 Pemancangan m' 704.00 Rp 75,000.00 Rp 52,800,000.00
4 Potong Kepala tiang titik 52.00 Rp 100,000.00 Rp 5,200,000.00
2 PC-1B
- Lantai kerja B0 m3 0.04 Rp 766,272.62 Rp 30,650.90
- Beton f'c 25 m3 0.45 Rp 1,006,085.48 Rp 452,738.46
- Besi U - 24 kg 4.69 Rp 13,510.00 Rp 63,361.90
- Besi U - 40 kg 119.93 Rp 13,510.00 Rp 1,620,254.30
- Bekisting Bataco m2 2.88 Rp 133,200.00 Rp 383,616.00
3 PC-1C
- Lantai kerja B0 m3 0.50 Rp 766,272.62 Rp 383,136.31
- Beton f'c 25 m3 6.30 Rp 1,006,085.48 Rp 6,338,338.50
- Besi U - 24 kg 155.40 Rp 13,510.00 Rp 2,099,454.00
- Besi U - 40 kg 1,921.23 Rp 13,510.00 Rp 25,955,817.30
- Bekisting Bataco m2 48.00 Rp 133,200.00 Rp 6,393,600.00
4 PC-1D
- Lantai kerja B0 m3 0.32 Rp 766,272.62 Rp 245,207.24
- Beton f'c 25 m3 3.97 Rp 1,006,085.48 Rp 3,994,159.34
- Besi U - 24 kg 72.52 Rp 13,510.00 Rp 979,745.20
- Besi U - 40 kg 899.14 Rp 13,510.00 Rp 12,147,381.40
- Bekisting Bataco m2 22.68 Rp 133,200.00 Rp 3,020,976.00
II SLOOF
1 SL-40 A
- Lantai kerja B0 m3 0.43 Rp 766,272.62 Rp 329,497.23
- Beton f'c 25 m3 3.58 Rp 1,006,085.48 Rp 3,601,786.00
- Besi U - 40 kg 738.09 Rp 13,510.00 Rp 9,971,595.90
- Bekisting Bataco m2 34.05 Rp 133,200.00 Rp 4,535,460.00
2 SL-50 A
- Lantai kerja B0 m3 0.39 Rp 766,272.62 Rp 298,846.32
- Beton f'c 25 m3 4.54 Rp 1,006,085.48 Rp 4,567,628.06
- Besi U - 40 kg 786.37 Rp 13,510.00 Rp 10,623,858.70
- Bekisting Bataco m2 15.71 Rp 133,200.00 Rp 2,092,572.00
3 SL-50 B
- Lantai kerja B0 m3 0.43 Rp 766,272.62 Rp 329,497.23
- Beton f'c 25 m3 4.47 Rp 1,006,085.48 Rp 4,497,202.08
- Besi U - 40 kg 677.91 Rp 13,510.00 Rp 9,158,564.10
- Bekisting Bataco m2 17.03 Rp 133,200.00 Rp 2,268,396.00
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
IV KOLOM
1 KOLOM K-400
- Beton f'c 25 m3 0.25 Rp 1,006,085.48 Rp 251,521.37
- Besi U - 40 kg 84.75 Rp 13,510.00 Rp 1,144,972.50
- Bekisting multiplek 12 mm ( expose ) m2 3.12 Rp 354,678.00 Rp 1,106,595.36
2 KOLOM K-750
- Beton f'c 25 m3 4.63 Rp 1,006,085.48 Rp 4,658,175.75
- Besi U - 40 kg 782.19 Rp 13,510.00 Rp 10,567,386.90
- Bekisting multiplek 12 mm ( expose ) m2 36.96 Rp 354,678.00 Rp 13,108,898.88
SUB TOTAL PEKERJAAN D-III Rp 591,173,010.23
D - IV PEKERJAAN BAJA
1 KOLOM BAJA
- Kolom CAST. 675.200.9.14 kg 12,768.00 Rp 24,845.00 Rp 317,220,960.00
- Kolom WF 400.200.8.13 kg 5,940.00 Rp 24,845.00 Rp 147,579,300.00
- Kolom HB 300.300.10.15 kg 8,460.00 Rp 24,845.00 Rp 210,188,700.00
- Kolom WF 300.150.6,5.9 kg 466.80 Rp 24,845.00 Rp 11,597,646.00
- Kolom WF 200.100.5,5.8 (gewel) kg 307.20 Rp 24,845.00 Rp 7,632,384.00
2 BALOK BAJA
- WF 400.200.8.13 kg 14,018.40 Rp 24,845.00 Rp 348,287,148.00
- HB 300.300.10.15 kg 17,474.60 Rp 24,845.00 Rp 434,156,437.00
- WF 300.150.6,5.9 kg 746.17 Rp 24,845.00 Rp 18,538,593.65
2 RANGKA KUDA-KUDA
- Rafter Castela 450.150.6,5.9 kg 23,104.00 Rp 24,845.00 Rp 574,018,880.00
- Voute WF 300.150.6,5.9 kg 602.80 Rp 24,845.00 Rp 14,976,566.00
- Rafter WF 250.125.6.9 kg - Rp 24,845.00 Rp -
- Voute WF 250.125.6.9 kg 347.27 Rp 24,845.00 Rp 8,627,923.15
- Rafter WF 200.100.5,5.8 kg 2,239.65 Rp 24,845.00 Rp 55,644,104.25
- Voute WF 200.100.5,5.8 kg 170.64 Rp 24,845.00 Rp 4,239,550.80
3 Tiebeam WF 200.100.5,5.8 kg 4,454.40 Rp 24,845.00 Rp 110,669,568.00
4 Dudukan Rangka Cladding UNP 150.75.6,5.10 kg 1,755.60 Rp 24,405.00 Rp 42,845,418.00
5 Gording C 150.65.20.2,3 kg 5,913.60 Rp 24,130.00 Rp 142,695,168.00
6 Rangka Cladding C 150.65.20.2,3 kg 7,100.72 Rp 24,130.00 Rp 171,340,373.60
7 Rangka Listplank C 100.50.20.2,3 kg 1,880.59 Rp 24,130.00 Rp 45,378,636.70
8 Bracing Kolom L 60.60.6 kg 586.23 Rp 23,915.00 Rp 14,019,690.45
9 Penggantung Talang L 40.40.4 kg 261.75 Rp 23,915.00 Rp 6,259,751.25
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
E - II PEKERJAAN PONDASI
1 Supply Tiang Pancang 250x250 mm m' 272.00 Rp 160,000.00 Rp 43,520,000.00
2 Pemancangan m' 272.00 Rp 75,000.00 Rp 20,400,000.00
3 Potong Kepala tiang titik 21.00 Rp 100,000.00 Rp 2,100,000.00
III SLOOF
1 SL-40 A
- Lantai kerja B0 m3 0.43 Rp 766,272.62 Rp 329,497.23
- Beton f'c 25 m3 3.58 Rp 1,006,085.48 Rp 3,601,786.00
- Besi U - 40 kg 702.94 Rp 13,510.00 Rp 9,496,719.40
- Bekisting Bataco m2 17.03 Rp 133,200.00 Rp 2,268,396.00
2 SL-50 A
- Lantai kerja B0 m3 0.34 Rp 766,272.62 Rp 260,532.69
- Beton f'c 25 m3 3.91 Rp 1,006,085.48 Rp 3,933,794.21
- Besi U - 40 kg 676.89 Rp 13,510.00 Rp 9,144,783.90
- Bekisting Bataco m2 13.53 Rp 133,200.00 Rp 1,802,196.00
3 SL-50 B
- Lantai kerja B0 m3 0.21 Rp 766,272.62 Rp 160,917.25
- Beton f'c 25 m3 2.23 Rp 1,006,085.48 Rp 2,243,570.61
- Besi U - 40 kg 338.95 Rp 13,510.00 Rp 4,579,214.50
- Bekisting Bataco m2 8.51 Rp 133,200.00 Rp 1,133,532.00
IV KOLOM
1 KOLOM K-350
- Beton f'c 25 m3 0.44 Rp 1,006,085.48 Rp 442,677.61
- Besi U - 40 kg 167.43 Rp 13,510.00 Rp 2,261,979.30
- Bekisting multiplek 12 mm ( expose ) m2 5.76 Rp 354,678.00 Rp 2,042,945.28
2 KOLOM K-450
- Beton f'c 25 m3 1.02 Rp 1,006,085.48 Rp 1,026,207.19
- Besi U - 40 kg 318.91 Rp 13,510.00 Rp 4,308,474.10
- Bekisting multiplek 12 mm ( expose ) m2 10.80 Rp 354,678.00 Rp 3,830,522.40
SUB TOTAL PEKERJAAN E-III Rp 289,531,364.38
E - IV PEKERJAAN BAJA
1 KOLOM BAJA
- Kolom WF 350.175.7.11 kg 2,379.00 Rp 24,845.00 Rp 59,106,255.00
- Kolom WF 250.125.6.9 kg 1,383.00 Rp 24,845.00 Rp 34,360,635.00
2 RANGKA KUDA-KUDA
- Rafter Castela 450.150.6,5.9 (WF 300.150.6,5.9) kg 1,034.00 Rp 24,845.00 Rp 25,689,730.00
- Voute WF 300.150.6,5.9 kg 91.67 Rp 24,845.00 Rp 2,277,541.15
- Rafter WF 250.125.6.9 kg 834.10 Rp 24,845.00 Rp 20,723,214.50
- Voute WF 250.125.6.9 kg 23.66 Rp 24,845.00 Rp 587,832.70
- Rafter WF 200.100.5,5.8 kg 160.40 Rp 24,845.00 Rp 3,985,138.00
- Voute WF 200.100.5,5.8 kg 41.80 Rp 24,845.00 Rp 1,038,521.00
3 Tiebeam WF 200.100.5,5.8 kg 767.88 Rp 24,845.00 Rp 19,077,978.60
4 Dudukan Rangka Cladding UNP 150.75.6,5.10 kg 316.40 Rp 24,405.00 Rp 7,721,742.00
5 Gording C 150.65.20.2,3 kg 2,754.10 Rp 24,130.00 Rp 66,456,433.00
6 Rangka Cladding C 150.65.20.2,3 kg 1,555.40 Rp 24,130.00 Rp 37,531,802.00
7 Rangka Listplank C 100.50.20.2,3 kg 438.40 Rp 24,130.00 Rp 10,578,592.00
9 Bracing Kolom L 60.60.6 kg 642.62 Rp 23,915.00 Rp 15,368,257.30
10 Penggantung Talang L 40.40.4 kg 37.75 Rp 23,915.00 Rp 902,791.25
11 Penggantung Talang Datar Plat Strip 40.4 kg 29.86 Rp 24,730.00 Rp 738,437.80
12 Begel talang turun plat strip 3x30 mm per jarak 1.50 m kg 28.00 Rp 24,730.00 Rp 692,440.00
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
F GROUND TANK
F-I PEKERJAAN TANAH
1 Galian tanah m3 655.20 Rp 64,625.00 Rp 42,342,300.00
2 Urug kembali m3 226.20 Rp 55,550.00 Rp 12,565,410.00
3 Buang tanah m3 429.00 Rp 37,125.00 Rp 15,926,625.00
4 Urugan Sirtu + Pemadatan m3 16.50 Rp 72,525.00 Rp 1,196,662.50
F - II PEKERJAAN PONDASI
1 Supply Tiang Pancang 250x250 mm m' 336.00 Rp 160,000.00 Rp 53,760,000.00
2 Pemancangan m' 336.00 Rp 75,000.00 Rp 25,200,000.00
3 Potong Kepala tiang titik 24.00 Rp 100,000.00 Rp 2,400,000.00
II BALOK
1 B-30
- Lantai kerja B0 m3 - Rp 766,272.62 Rp -
- Beton fc' 30 m3 0.32 Rp 1,091,415.48 Rp 349,252.95
- Besi U - 24 kg 12.03 Rp 13,510.00 Rp 162,525.30
- Besi U - 40 kg 22.05 Rp 13,510.00 Rp 297,895.50
- Bekisting Bataco m2 4.24 Rp 133,200.00 Rp 564,768.00
2 B-40A
- Lantai kerja B0 m3 - Rp 766,272.62 Rp -
- Beton fc' 30 m3 4.00 Rp 1,091,415.48 Rp 4,365,661.90
- Besi U - 24 kg 99.53 Rp 13,510.00 Rp 1,344,650.30
- Besi U - 40 kg 261.46 Rp 13,510.00 Rp 3,532,324.60
- Bekisting Bataco m2 42.63 Rp 133,200.00 Rp 5,678,316.00
3 B-40B
- Lantai kerja B0 m3 - Rp 766,272.62 Rp -
- Beton fc' 30 m3 1.50 Rp 1,091,415.48 Rp 1,637,123.21
- Besi U - 24 kg 36.77 Rp 13,510.00 Rp 496,762.70
- Besi U - 40 kg 112.20 Rp 13,510.00 Rp 1,515,822.00
- Bekisting Bataco m2 15.75 Rp 133,200.00 Rp 2,097,900.00
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
IV KOLOM
1 KOLOM K-30
- Beton fc' 30 m3 4.41 Rp 1,091,415.48 Rp 4,813,142.25
- Besi U - 40 kg 923.16 Rp 13,510.00 Rp 12,471,891.60
- Bekisting multiplek 12 mm ( expose ) m2 58.80 Rp 354,678.00 Rp 20,855,066.40
SUB TOTAL PEKERJAAN F-III Rp 579,187,017.51
SUB TOTAL PEKERJAAN F Rp 732,578,015.01
G R. GENSET
G- I PEKERJAAN TANAH
1 Galian tanah m3 24.00 Rp 64,625.00 Rp 1,551,000.00
2 Urug kembali m3 7.90 Rp 55,550.00 Rp 438,845.00
3 Buang tanah m3 16.10 Rp 37,125.00 Rp 597,712.50
4 Urugan Sirtu + Pemadatan m3 120.00 Rp 72,525.00 Rp 8,703,000.00
G - II PEKERJAAN PONDASI
1 Supply Tiang Pancang 250x250 mm m' 336.00 Rp 160,000.00 Rp 53,760,000.00
2 Pemancangan m' 336.00 Rp 75,000.00 Rp 25,200,000.00
3 Potong Kepala tiang titik 24.00 Rp 100,000.00 Rp 2,400,000.00
II PONDASI GENSET
- Lantai kerja B0 m3 0.26 Rp 766,272.62 Rp 199,230.88
- Beton f'c 25 m3 1.58 Rp 1,006,085.48 Rp 1,589,615.05
- Besi U - 24 kg 118.17 Rp 13,510.00 Rp 1,596,476.70
- Besi U - 40 kg 4.46 Rp 13,510.00 Rp 60,254.60
- Bekisting Bataco m2 3.01 Rp 133,200.00 Rp 400,932.00
PONDASI TRAFO
- Lantai kerja B0 m3 0.12 Rp 766,272.62 Rp 91,952.71
- Beton f'c 25 m3 0.85 Rp 1,006,085.48 Rp 855,172.65
- Besi U - 24 kg 29.84 Rp 13,510.00 Rp 403,138.40
- Besi U - 40 kg 20.67 Rp 13,510.00 Rp 279,251.70
- Bekisting Bataco m2 2.24 Rp 133,200.00 Rp 298,368.00
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
III SLOOF
1 SL-50 A
- Lantai kerja B0 m3 0.33 Rp 766,272.62 Rp 252,869.96
- Beton f'c 25 m3 5.48 Rp 1,006,085.48 Rp 5,513,348.41
- Besi U - 40 kg 428.56 Rp 13,510.00 Rp 5,789,845.60
- Bekisting Bataco m2 10.33 Rp 133,200.00 Rp 1,375,956.00
2 SL-50 B
- Lantai kerja B0 m3 0.20 Rp 766,272.62 Rp 153,254.52
- Beton f'c 25 m3 3.25 Rp 1,006,085.48 Rp 3,269,777.80
- Besi U - 40 kg 254.40 Rp 13,510.00 Rp 3,436,944.00
- Bekisting Bataco m2 26.00 Rp 133,200.00 Rp 3,463,200.00
IV BALOK
B-50A
- Lantai kerja Bo m3 - Rp 766,272.62 Rp -
- Beton f'c 25 m3 5.73 Rp 1,006,085.48 Rp 5,764,869.78
- Besi U - 40 kg 456.25 Rp 13,510.00 Rp 6,163,937.50
- Bekisting multiplek 12 mm ( expose ) m2 57.25 Rp 362,895.00 Rp 20,775,738.75
B-50B
- Lantai kerja Bo m3 - Rp 766,272.62 Rp -
- Beton f'c 25 m3 4.50 Rp 1,006,085.48 Rp 4,527,384.64
- Besi U - 40 kg 358.63 Rp 13,510.00 Rp 4,845,091.30
- Bekisting multiplek 12 mm ( expose ) m2 45.00 Rp 362,895.00 Rp 16,330,275.00
LS-40
- Lantai kerja Bo m3 - Rp 766,272.62 Rp -
- Beton f'c 25 m3 2.41 Rp 1,006,085.48 Rp 2,424,666.00
- Besi U - 40 kg 234.28 Rp 13,510.00 Rp 3,165,122.80
- Bekisting multiplek 12 mm ( expose ) m2 30.10 Rp 362,895.00 Rp 10,923,139.50
V PLAT LANTAI
LANTAI EV - 0.50
- Lantai kerja Bo m3 13.66 Rp 766,272.62 Rp 10,467,283.98
- Beton f'c 25 m3 14.65 Rp 1,006,085.48 Rp 14,739,152.23
- Besi U - 40 kg 698.14 Rp 13,510.00 Rp 9,431,871.40
- Bekisting multiplek 12 mm ( expose ) m2 6.65 Rp 414,645.00 Rp 2,757,389.25
LANTAI EV +3.25
- Lantai kerja Bo m3 - Rp 766,272.62 Rp -
- Beton f'c 25 m3 33.12 Rp 1,006,085.48 Rp 33,321,550.97
- Besi U - 40 kg 810.48 Rp 13,510.00 Rp 10,949,584.80
- Bekisting multiplek 12 mm ( expose ) m2 172.25 Rp 414,645.00 Rp 71,422,601.25
VI KOLOM
1 KOLOM K-30
- Beton f'c 25 m3 4.05 Rp 1,006,085.48 Rp 4,074,646.18
- Besi U - 40 kg 737.10 Rp 13,510.00 Rp 9,958,221.00
- Bekisting multiplek 12 mm ( expose ) m2 54.00 Rp 414,645.00 Rp 22,390,830.00
SUB TOTAL PEKERJAAN G-III Rp 344,938,495.99
2 SALURAN A
- Lantai kerja B0 m3 3.92 Rp 766,272.62 Rp 3,003,788.67
- Beton f'c 25 m3 79.92 Rp 1,006,085.48 Rp 80,406,351.26
- Besi U - 40 kg 4,283.05 Rp 13,510.00 Rp 57,864,005.50
- Bekisting m2 119.96 Rp 133,200.00 Rp 15,978,672.00
- Siku L 40.40.4 kg 269.68 Rp 23,915.00 Rp 6,449,397.20
- Penebalan pengatur level m2 107.10 Rp 49,500.00 Rp 5,301,450.00
I - II PEKERJAAN PONDASI
1 Supply Tiang Pancang 250x250 mm m' 756.00 Rp 160,000.00 Rp 120,960,000.00
2 Pemancangan m' 756.00 Rp 75,000.00 Rp 56,700,000.00
3 Potong Kepala tiang titik 52.00 Rp 100,000.00 Rp 5,200,000.00
2 WC
I RETAINING WALL 9
- Lantai kerja B0 m3 0.32 Rp 766,272.62 Rp 245,207.24
- Beton f'c 25 m3 3.43 Rp 1,006,085.48 Rp 3,450,873.18
- Besi U - 40 kg 309.81 Rp 13,510.00 Rp 4,185,533.10
- Bekisting multiplek 12 mm ( expose ) m2 19.60 Rp 351,495.00 Rp 6,889,302.00
- Batu kali m3 14.63 Rp 860,625.00 Rp 12,590,943.75
II PLAT LANTAI
PLAT LANTAI S1 (-0.05M)
- Lantai kerja Bo m3 0.67 Rp 766,272.62 Rp 513,402.65
- Beton f'c 25 m3 1.61 Rp 1,006,085.48 Rp 1,619,797.62
- Besi U - 40 kg 309.84 Rp 13,510.00 Rp 4,185,938.40
- Bekisting multiplek 12 mm ( expose ) m2 1.17 Rp 414,645.00 Rp 485,134.65
3 TANGGA
- Lantai kerja B0 m3 0.16 Rp 766,272.62 Rp 122,603.62
- Beton f'c 25 m3 0.77 Rp 1,006,085.48 Rp 774,685.82
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
4 RAMP
I RETAINING WALL RAMP A AS D/4-5
- Lantai kerja B0 m3 2.22 Rp 766,272.62 Rp 1,701,125.21
- Beton f'c 25 m3 14.94 Rp 1,006,085.48 Rp 15,030,917.01
- Besi U - 40 kg 1,183.70 Rp 13,510.00 Rp 15,991,787.00
- Bekisting multiplek 12 mm ( expose ) m2 76.96 Rp 351,495.00 Rp 27,051,055.20
- Batu kali m3 38.60 Rp 860,625.00 Rp 33,220,125.00
I - IV PEKERJAAN BAJA WC
1 KOLOM BAJA
- Kolom WF 150.75.5.7 kg 448.00 Rp 24,845.00 Rp 11,130,560.00
2 RANGKA KUDA-KUDA
- WF 150.75.5.7 kg 257.60 Rp 24,845.00 Rp 6,400,072.00
- Voute WF 150.75.5.7 kg 23.66 Rp 24,845.00 Rp 587,832.70
3 Tiebeam WF 150.75.5.7 kg 168.00 Rp 24,845.00 Rp 4,173,960.00
5 Gording C 125.50.20.2,3 kg 82.53 Rp 24,130.00 Rp 1,991,448.90
7 Rangka Listplank C 75.40.20.2 kg 140.73 Rp 24,130.00 Rp 3,395,814.90
10 Penggantung Talang L 40.40.4 kg 9.08 Rp 23,915.00 Rp 217,148.20
11 Penggantung Talang Datar Plat Strip 40.4 kg 5.00 Rp 24,730.00 Rp 123,650.00
12 Begel talang turun plat strip 3x30 mm per jarak 1.50 m kg 1.47 Rp 24,730.00 Rp 36,353.10
16 Plat baja t= 8 mm kg 53.78 Rp 24,730.00 Rp 1,329,979.40
17 Plat baja t= 6 mm kg 8.83 Rp 24,730.00 Rp 218,365.90
19 Angkur Æ 16 mm ; L= 300 U-40 bh 40.00 Rp 40,000.00 Rp 1,600,000.00
20 Murbaut Æ 12 mm bh 15.00 Rp 7,500.00 Rp 112,500.00
21 Murbaut Æ 16 mm - A325 bh 100.00 Rp 12,500.00 Rp 1,250,000.00
24 Trekstang Æ 12 mm bh 16.80 Rp 22,500.00 Rp 378,000.00
25 Ikatan angin Æ 16 mm bh 2.00 Rp 250,000.00 Rp 500,000.00
26 Jarum keras Æ 16 mm bh 4.00 Rp 25,000.00 Rp 100,000.00
27 Sandblasting - Standart SA 2.5 kg 1,198.68 Rp 2,547.26 Rp 3,053,352.09
28 Cat baja Epoxy t=150 mikron kg 1,198.68 Rp 1,956.49 Rp 2,345,201.01
J PEKERJAAN LAIN-LAIN
1 - Kolom WF 250.125.6.9 (Bangunan Office) kg 612.08 Rp 24,845.00 Rp 15,207,127.60
2 KOLOM K-400 (Bangunan Gudang Bahan Baku (AS. 3 - 13)
- Beton f'c 25 m3 0.25 Rp 1,006,085.48 Rp 251,521.37
- Besi U - 40 kg 84.75 Rp 13,510.00 Rp 1,144,972.50
- Bekisting multiplek 12 mm ( expose ) m2 3.12 Rp 414,645.00 Rp 1,293,692.40
3 - Rafter Castela 375.125.6.9 kg 13,890.74 Rp 24,845.00 Rp 345,115,345.86
PEKERJAAN BAJA WC
1 KOLOM BAJA
- Kolom WF 200.100.5,5.8 kg 505.60 Rp 24,845.00 Rp 12,561,632.00
2 RANGKA KUDA-KUDA
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
Note :
Mohon tidak merubah Format BQ, Apabila ada pekerjaan atau item yang belum tercantum silahkan dimasukkan
dalam pekerjaan lain-lain
RENCANA ANGGARAN BIAYA
PEMILIK : PT. DHARMA NYATA PRESS
PROYEK : JL. CENDRAWASIH - JOMBANG
PEKERJAAN : FINISHING ARSITEKTUR
HARGA JUMLAH
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME SATUAN HARGA
JUMLAH 1139798573.93385
JUMLAH 1138717241.47385
HARGA JUMLAH
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME SATUAN HARGA
JUMLAH 521891051.203846
2 Pekerjaan Lantai
- Keramik Lobby Granito 60x60 Pearl White ex Granito m2 42.09 410,375.00 17272683.75
- Keramik 40x40 area Office ex Platinum m2 195.44 189,875.00 37109170
- Keramik 40x40 area Tangga Utama ex Platinum m2 10.14 189,875.00 1925332.5
- Plin Lantai 10x60 Granito ex Granito m' 26.84 235,025.00 6308071
- Plin Lantai 10x40 Platinum ex Platinum m' 156.75 185,900.00 29139825
3 Pek Cat
- Cat dinding + kolom interior ex Dulux Pentalite m2 87.62 31,923.50 2797137.07
- Cat Plafon dak interior ex Dulux Pentalite m2 221.96 31,923.50 7085740.06
- Cat exterior ex Dulux weathershield m2 49.04 37,123.50 1820536.44
- Cat Partisi Gypsum,Calsiboard ex Dulux Pentalite m2 232.56 31,923.50 7424129.16
5 Plafon
- Plafon Calsioard 6mm ex Kalsiboard m2 6.95 151,122.20 1050299.29
- Plafon Gypsum 9mm ex Jayaboard m2 215.01 136,562.20 29362238.622
- List Plafon Shadow line ex Jayaboard m' 140.37 26,435.00 3710680.95
- Cat Plafond Gypsum, Calsiboard ex Dulux Pentalite m2 221.96 31,923.50 7085740.06
I.2 LANTAI 2
1 Pekerjaan Pasangan Dinding
- bata ringan ex Citicon, setara m2 164.57 126,495.00 20817282.15
- plesteran acian PM 210+PM310 ex Prime Mortar Setara m2 329.14 109,241.46 35955733.5958333
- benangan m' 132.00 15,355.63 2026942.5
- kolom praktis pembesian 4D10,Ø8-150 m3 6.64 8,149,380.17 54111884.2975207
- balok praktis pembesian 4D10,Ø8-150 m3 5.27 8,149,380.17 42947233.4710744
- Partisi Gypsum 12 mm Ex Jayaboard, Knauf m2 43.28 263,557.50 11406768.6
- Cover Kolom Kalsiboard 8mm Ex Calsi m2 61.70 241,182.50 14880960.25
- Partisi Kalsiboard 8mm Ex Calsi m2 268.72 295,932.50 79522981.4
HARGA JUMLAH
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME SATUAN HARGA
2 Pekerjaan Lantai
- Keramik 40x40 area Office ex Platinum m2 217.55 189,875.00 41307306.25
- Keramik 40x40 area Tangga Utama ex Platinum m2 10.14 189,875.00 1925332.5
- Plin Lantai 10x40 Platinum ex Platinum m' 47.68 185,900.00 8863712
HARGA JUMLAH
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME SATUAN HARGA
3 Pek Cat
- Cat dinding + kolom interior ex Dulux Pentalite m2 658.28 31,923.50 21014601.58
- Cat Plafon dak interior ex Dulux Pentalite m2 605.89 31,923.50 19342129.415
- Cat exterior ex Dulux weathershield m2 658.43 37,123.50 24443226.105
- Cat Partisi Gypsum,Calsiboard ex Dulux Pentalite m2 312.00 31,923.50 9960036.2295
5 Plafon
- Plafon Calsioard 6mm ex Kalsiboard m2 6.95 151,122.20 1050299.29
- Plafon Gypsum 9mm ex Jayaboard m2 598.93 136,562.20 81791198.446
- List Plafon Shadow line ex Jayaboard m' 143.93 26,435.00 3804789.55
- Cat Plafond Gypsum, Calsiboard ex Dulux Pentalite m2 605.89 31,923.50 19342129.415
2 Pekerjaan Lantai
- Floorhardener 5kg/m2 natural ex Sika , Fosroc m2 1,245.50 68,000.00 84694000
3 Pek Cat
- Cat dinding + kolom interior ex Catylac m2 445.09 31,923.50 14208830.615
- Cat exterior ex Dulux weathershield m2 890.18 37,123.50 33046597.23
2 Pekerjaan Lantai
- Floorhardener 5kg/m2 natural ex Sika , Fosroc m2 396.36 68,000.00 26952480
- Epoxy t=500 mikron ex Sika , Fosroc m2 593.03 201,050.00 119228681.5
HARGA JUMLAH
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME SATUAN HARGA
3 Pek Cat
- Cat dinding + kolom interior ex Catylac m2 410.28 31,923.50 13097573.58
- Cat exterior ex Dulux weathershield m2 205.14 37,123.50 7615514.79
HARGA JUMLAH
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME SATUAN HARGA
4 Pas. Kawat loket
- Kawat Loket uk. 3x3cm tebal 2mm m2 72.00 50,000.00 3600000
- Hollow 40x40x1.4 Kg 864.00 17,261.59 14914015.2249135
- Plat strip 40x4 Kg 2,256.00 24,730.00 55790880
- Wirebrush dan cat finish Kg 3,468.00 1,634.62 5668846.15384615
- Murbaut dia.6mm bh 240.00 7,500.00 1800000
- Kawat nyamuk M40 aluminium m2 144.00 32,500.00 4680000
III.2 LANTAI 2
1 Pekerjaan Pasangan Dinding
- bata ringan ex Citicon, setara m2 205.14 126,495.00 25949184.3
- plesteran acian PM 210+PM310 ex Prime Mortar Setara m2 410.27 109,241.46 44818493.1104167
- benangan m2 205.14 15,355.63 3150052.9125
- kolom praktis pembesian 4D10,Ø8-150 m3 1.62 8,149,380.17 13201995.8677686
- balok praktis pembesian 4D10,Ø8-150 m3 3.60 8,149,380.17 29337768.5950413
- Partisi Calsiboard 8mm ex Calsi m2 175.57 295,932.50 51956869.025
2 Pekerjaan Lantai
- Epoxy t=500 mikron ex Sika , Fosroc m2 593.03 201,050.00 119228681.5
3 Pek Cat
- Cat dinding + kolom interior ex Catylac m2 410.28 31,923.50 13097573.58
- Cat exterior ex Dulux weathershield m2 593.03 37,123.50 22015349.205
2 Pekerjaan Lantai
- Floorhardener 5kg/m2 natural ex Sika , Fosroc m2 396.36 68,000.00 26952480
3 Pek Cat
- Cat dinding + kolom interior ex Catylac m2 314.59 31,923.50 10042813.865
- Cat exterior ex Dulux weathershield m2 943.79 37,123.50 35036602.4475
I.2 LANTAI 2
1 Pintu P2 Dilengkapi Door Closser unit 1.00 3,375,000.00 3375000
2 Pintu PJ6 Dilengkapi Door Closser unit 1.00 11,214,000.00 11214000
3 Pintu PJ7 Dilengkapi Door Closser unit 1.00 10,038,000.00 10038000
4 Pintu PJ8 Dilengkapi Door Closser unit 1.00 10,650,000.00 10650000
5 Jendela J22 unit 1.00 13,807,500.00 13807500
6 Jendela J23 unit 1.00 25,842,000.00 25842000
7 Jendela J24 unit 1.00 8,506,500.00 8506500
8 Jendela J25 unit 1.00 5,256,000.00 5256000
9 Jendela J26 unit 1.00 4,350,000.00 4350000
10 Jendela J26' unit 1.00 4,350,000.00 4350000
11 Jendela J27 unit 1.00 3,436,500.00 3436500
12 Jendela J28 unit 1.00 4,831,500.00 4831500
13 Jendela J29 unit 1.00 2,619,000.00 2619000
14 Jendela J30 unit 1.00 1,671,000.00 1671000
15 Jendela J31 unit 1.00 1,155,000.00 1155000
16 Jendela J32 unit 1.00 1,276,500.00 1276500
17 Jendela J33 unit 1.00 3,766,500.00 3766500
III.2 LANTAI 2
1 Jendela J34 unit 12.00 6,960,000.00 83520000
J PEKERJAAN POWERHOUSE
1 Pasangan dinding 1/2 Bata 1PC : 3PS m2 49.20 120,687.50 5937825
2 Pasangan dinding 1/2 Bata 1PC : 5PS m2 225.40 115,825.00 26106955
1 Pasangan dinding 1 Bata 1PC : 3PS m2 28.56 198,850.00 5679156
2 Pasangan dinding 1 Bata 1PC : 5PS m2 19.04 204,475.00 3893204
3 Plesteran plester aci dinding 1PC : 3PS m2 283.60 56,545.00 16036162
4 Plesteran plester aci dinding 1PC : 5PS m2 420.00 53,905.00 22640100
5 Pekerjaan Benangan m' 330.93 15,355.63 5081636.98125
6 Pekerjaan Cat Dinding Interior Ex Catilac m2 225.40 31,923.50 7195556.9
7 Pekerjaan Cat Dinding Exterior ex Dulux weathershield m2 225.40 37,123.50 8367636.9
8 Pekerjaan Kolom dan Balok Praktis m3 2.65 8,149,380.17 21595857.4380165
9 Plesteran Balok kolom m2 32.22 56,545.00 1821879.9
10 Plesteran Plafon dak m2 162.86 53,905.00 8778968.3
11 Pekerjaan Cat Plafon Dak Beton Ex Catilac m2 162.86 31,923.50 5199061.21
12 Pekerjaan Pintu Besi P1 unit 4.00 12,500,000.00 50000000
13 Pas Keramik Lantai R Trafo, LVMD,Genset,R Pln Murano 30x30 m2 106.47 189,925.00 20221314.75
L PEKERJAAN HALAMAN
1 Pagar Panel Beton m2 592.85 450,000.00 266782500
2 Pekerjaan Pembentukan Lahan
- Pemadatan eksisting m3 304.46 49,150.00 14964209
- Onderlaag + pengunci 15/20 m1 210.75 120,000.00 25290000
- Pasang Paving K500 t=10cm Ex Focon setara m2 487.72 145,980.00 71197365.6
- Kanstin Ex Focon setara m1 123.36 129,385.00 15960933.6
I.2 LANTAI 2
4 Pek Area Toilet
Paper Holder ex Toto-TX 703 AES bh 3.00 175,000.00 525000
1 Pek.Saluran bangunan
Pasang U-Ditch Uk.60x60x120 + Cover bh 84.00 2,210,991.20 185723260.8
2 Septitank Biotech Kap. 3 m3 bh 1.00 13,500,000.00 13500000
3 Septitank Biotech Kap. 1 m3 bh 2.00 6,000,000.00 12000000
4 Pek. saluran depan jalan Ex. Calvary, Focon, Lisa Concrete atau setara bh 64.00 10,099,045.63 646338920
Box Culvert Uk. 1500x1500
5 Pek.Pasang Kaca Laminnated Tempered Clear 6+6 mm m2 28.96 750,000.00 21721746.75
(Canopy As 1)
6 Pek.Canopy As A dan As F
a. Pek. Pasang Rangka Hollow 100.50.2,0 m1 352.80 85,000.00 29988000
b. Pek. Pasang Talang datar Stainlesstell SUS m1 67.20 450,000.00 30240000
304 T = 1,2mm
c. 'Capping Flashing Galvalum sheet t= 0,50 mm natural m1 360.00 175,000.00 63000000
d. Penutup Polycarbonate m2 270.00 236,797.50 63935325
Note :
Mohon tidak merubah Format BQ, Apabila ada pekerjaan atau item yang belum tercantum pada Format BQ
silahkan dimasukkan dalam pekerjaan lain-lain.
HARGA JUMLAH
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME SATUAN HARGA
Segala sesuatu berkaitan dengan warna, model, dan type harus diasistensikan dahulu kepada owner.
Kontraktor berkewajiban : menambah, melengkapi,memperkuat pekerjaan yang ditawarkan (struktur & arsitektur)
sehingga hasil akhir pekerjaan dapat berfungsi dengan baik dan sempurna, walaupun di gambar dan BQ belum ada.
REKAPITULASI RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN - JOMBANG
VOLUME
No. URAIAN PEKERJAAN TOTAL HARGA BETON BESI BETON ( kg ) WIREMESH BEKISTING BAJA ATAP CLADDING
LUAS BANGUNA (m3) U - 24 U -40 (m2) (m2) (Kg) (m2) (m2)
F GROUND TANK
F.I. PEKERJAAN TANAH Rp 72,030,997.50
F.II. PEKERJAAN PONDASI Rp 81,360,000.00
F.III. PEKERJAAN BETON Rp 579,187,017.51 152.87 157.16 13736.87 754.70
G R. GENSET
G.I. PEKERJAAN TANAH Rp 11,290,557.50
G.II. PEKERJAAN PONDASI Rp 81,360,000.00
G.III. PEKERJAAN BETON Rp 344,938,495.99 36.4 93.77 272.13 4104.43 421.84
H SALURAN
H.I. PEKERJAAN TANAH Rp 103,439,006.00
H.II. PEKERJAAN BETON Rp 586,927,981.36 157.18 0.00 17643.46 936.85
M PEKERJAAN ALUMUNIUM
I.I OFFICE AS.1-3 Rp 341,783,000.00
I.II GUDANG AS.3-13 Rp 381,970,000.00
I.III PERCETAKAN AS.13-19 Rp 138,520,000.00
I.IV GUDANG AS 13-19 Rp 27,840,000.00
TOTAL Rp 23,131,877,246.98 3737.63 1300.67 3224.55 118951.53 3461.26 5961.82 202780.77 8302.33 3851.46
PROFIT 10%
TOTAL II Rp 25,445,064,971.67
PPN 10% Rp 2,544,506,497.17
GRAND TOTAL Rp 27,989,571,468.84
PEMBULATAN Rp 27,989,571,000.00
ARDY KUSTRIYONO
Direktur Utama
JADWAL PELAKSANAAN
F GROUND TANK
F.I. PEKERJAAN TANAH 72030997.5 0.3113927881 0.155696394 0.155696394
F.II. PEKERJAAN PONDASI 81360000 0.3517224267 0.175861213 0.175861213
F.III. PEKERJAAN BETON 579187017.509524 2.5038478777 0.500769576 0.500769576 0.500769576 0.500769576 0.500769576
G R. GENSET
G.I. PEKERJAAN TANAH 11290557.5 0.0488095168 0.024404758 0.024404758
G.II. PEKERJAAN PONDASI 81360000 0.3517224267 0.175861213 0.175861213
G.III. PEKERJAAN BETON 344938495.988095 1.4911824592 0.298236492 0.298236492 0.298236492 0.298236492 0.298236492
H SALURAN
H.I. PEKERJAAN TANAH 103439006 0.4471708236 0.223585412 0.223585412
H.II. PEKERJAAN BETON 586927981.361905 2.5373123638 0.507462473 0.507462473 0.507462473 0.507462473 0.507462473
M PEKERJAAN ALUMUNIUM
I.I OFFICE AS.1-3 341783000 1.477541128 0.369385282 0.369385282 0.369385282 0.369385282
I.II GUDANG AS.3-13 381970000 1.6512710833 0.412817771 0.412817771 0.412817771 0.412817771
I.III PERCETAKAN AS.13-19 138520000 0.5988273175 0.149706829 0.149706829 0.149706829 0.149706829
I.IV GUDANG AS 13-19 27840000 0.1203533968 0.030088349 0.030088349 0.030088349 0.030088349
A PEKERJAAN PERSIAPAN
1 Pembersihan m2 5,583.39
2 Pagar Sementara m1 420.57
3 Egalisasi / Bouwplank m1 413.57
4 Air kerja dan listrik kerja Ls 1.00
5 Direksi keet & Gudang m2
6 Km / Wc darurat pekerja Ls 1.00
7 Mob - demob Ls 1.00
8 Shop drawing & Asbuild drawing Ls 1.00
9 K3 Ls 1.00
B - II PEKERJAAN PONDASI
1 Mob- Demobilisasi Ls 1.00
2 Supply Tiang Pancang 250x250 mm m' 786.00
3 Pemancangan m' 786.00
4 Potong Kepala tiang titik 57.00
2 PC-2
- Lantai kerja B0 m3 0.23
- Beton f'c 25 m3 2.95
- Besi U - 24 kg 9.62
- Besi U - 40 kg 2,411.19
- Bekisting Bataco m2 13.68
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
II SLOOF
1 SL-40
- Lantai kerja B0 m3 0.04
- Beton f'c 25 m3 0.37
- Besi U - 24 kg 42.30
- Besi U - 40 kg 33.57
- Bekisting Bataco m2 3.50
2 SL-55A
- Lantai kerja B0 m3 0.97
- Beton f'c 25 m3 11.17
- Besi U - 24 kg 567.80
- Besi U - 40 kg 824.89
- Bekisting Bataco m2 38.69
3 SL-60A
- Lantai kerja B0 m3 0.57
- Beton f'c 25 m3 7.24
- Besi U - 24 kg 314.33
- Besi U - 40 kg 767.53
- Bekisting Bataco m2 23.00
4 SL-60B
- Lantai kerja B0 m3 0.27
- Beton f'c 25 m3 3.10
- Besi U - 24 kg 141.09
- Besi U - 40 kg 384.78
- Bekisting Bataco m2 10.32
5 SL-105A
- Lantai kerja B0 m3 0.68
- Beton f'c 25 m3 13.55
- Besi U - 24 kg 519.73
- Besi U - 40 kg 715.48
- Bekisting Bataco m2 25.80
VI KOLOM
1 KOLOM K-450
- Beton f'c 25 m3 1.70
- Besi U - 40 kg 530.46
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
2 KOLOM K-500
- Beton f'c 25 m3 0.38
- Besi U - 40 kg 130.28
- Bekisting multiplek 12 mm ( expose ) m2 3.84
LANTAI 2 (+ 4,35 M)
V TANGGA
- Beton f'c 25 m3 2.77
- Besi U - 24 kg 250.98
- Besi U - 40 kg 209.98
- Bekisting multiplek 12 mm ( expose ) m2 19.68
B - IV PEKERJAAN BAJA
1 KOLOM BAJA
- Kolom WF 400.200.8.13 kg 536.58
- Kolom WF 350.175.7.11 kg 3,942.87
- Kolom WF 200.100.5,5.8 kg 1,457.69
2 RANGKA KUDA-KUDA
- Rafter + Voute WF 250.125.6.9 kg 2,121.84
- Konsol + Voute WF 200.100.5,5.8 kg 147.92
3 Balok
- Balok Castela 525.175.7.11 kg 1,019.28
- Balok Castela 450.150.6,5.9 kg 2,091.53
- Balok WF 350.175.7.11 kg 2,774.19
- Balok WF 300.150.6,5.9 kg 427.17
- Balok WF 250.125.6.9 kg 1,518.36
- WF 200.100.5,5.8 kg 610.99
4 Dudukan Rangka Cladding UNP 150.75.6,5.10 kg 1,075.20
5 Gording C 150.65.20.2,3 kg 1,386.00
6 Rangka Cladding C 150.65.20.2,3 kg 1,873.62
7 Rangka Listplank C 100.50.20.2,3 kg
8 Rangka Listplank C 75.45.20.2,3 kg
9 Bracing Kolom L 60.60.6 kg
10 Penggantung Talang L 40.40.4 kg
11 Penggantung Talang Datar Plat Strip 40.4 kg
12 Begel talang turun plat strip 3x30 mm per jarak 1.50 m kg
13 Plat baja t= 15 mm kg
14 Plat baja t= 12 mm kg
15 Plat baja t= 10 mm kg
16 Plat baja t= 8 mm kg
17 Plat baja t= 6 mm kg
18 Angkur Æ 19 mm ; L= 760 - U-50 bh 48.00
19 Angkur Æ 16 mm ; L= 760 - U-40 bh
20 Murbaut Æ 12 mm bh
21 Murbaut Æ 16 mm - A325 bh
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
22 Murbaut Æ 19 mm - A325 bh
23 Murbaut Æ 22 mm - A325 bh
24 Trekstang Æ 12 mm bh
25 Ikatan angin Æ 16 mm bh
26 Jarum keras Æ 16 mm bh
27 Pekerjaan Tangga
- Balok WF 350.175.7.11 Kg
- WF 200.100.5,5.8 Kg
- Siku 40.40.4 Kg
- Plat Bordes 3,2 mm Kg
- Pipa Hitam 2 " Kg
- Plat t=12 mm Kg
- Plat t=6 mm Kg
28 Sandblasting - Standart SA 2.5 kg
29 Cat baja F Talit ex. Kansai kg
C - II PEKERJAAN PONDASI
1 Supply Tiang Pancang 250x250 mm m' 632.00
2 Pemancangan m' 632.00
3 Potong Kepala tiang titik 48.00
II RETAINING WALL
1 RETAINING WALL 8
- Lantai kerja B0 m3
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
III SLOOF
1 SL-40 A
- Lantai kerja B0 m3 0.71
- Beton f'c 25 m3 5.99
- Besi U - 40 kg 625.37
- Bekisting Bataco m2 57.00
2 SL-50 A
- Lantai kerja B0 m3 0.39
- Beton f'c 25 m3 4.54
- Besi U - 40 kg 786.37
- Bekisting Bataco m2 15.71
3 SL-50 B
- Lantai kerja B0 m3 0.88
- Beton f'c 25 m3 9.23
- Besi U - 40 kg 1,399.61
- Bekisting Bataco m2 35.15
IV KOLOM
1 KOLOM K-450
- Beton f'c 25 m3 3.40
- Besi U - 40 kg 530.46
- Bekisting multiplek 12 mm ( expose ) m2 36.00
SUB TOTAL PEKERJAAN C-III
C - IV PEKERJAAN BAJA
1 KOLOM BAJA
- Kolom WF 350.175.7.11 kg
- Kolom WF 300.150.6,5.9 kg
2 RANGKA KUDA-KUDA
- Rafter Castela 450.150.6,5.9 (WF 300.150.6,5.9) kg
- Voute WF 300.150.6,5.9 kg
- Rafter WF 250.125.6.9 kg
- Voute WF 250.125.6.9 kg
- Rafter WF 200.100.5,5.8 kg
- Voute WF 200.100.5,5.8 kg
3 Tiebeam WF 200.100.5,5.8 kg
4 Dudukan Rangka Cladding UNP 150.75.6,5.10 kg
5 Gording C 150.65.20.2,3 kg
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
D - II PEKERJAAN PONDASI
2 Supply Tiang Pancang 250x250 mm m' 704.00
3 Pemancangan m' 704.00
4 Potong Kepala tiang titik 52.00
2 PC-1B
- Lantai kerja B0 m3 0.04
- Beton f'c 25 m3 0.45
- Besi U - 24 kg 4.69
- Besi U - 40 kg 119.93
- Bekisting Bataco m2 2.88
3 PC-1C
- Lantai kerja B0 m3 0.50
- Beton f'c 25 m3 6.30
- Besi U - 24 kg 155.40
- Besi U - 40 kg 1,921.23
- Bekisting Bataco m2 48.00
4 PC-1D
- Lantai kerja B0 m3 0.32
- Beton f'c 25 m3 3.97
- Besi U - 24 kg 72.52
- Besi U - 40 kg 899.14
- Bekisting Bataco m2 22.68
II SLOOF
1 SL-40 A
- Lantai kerja B0 m3 2.54
- Beton f'c 25 m3 21.36
- Besi U - 40 kg 2,594.48
- Bekisting Bataco m2 203.40
2 SL-50 A
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting Bataco m2
3 SL-50 B
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting Bataco m2
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
IV KOLOM
1 KOLOM K-400
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
2 KOLOM K-750
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
SUB TOTAL PEKERJAAN D-III
D - IV PEKERJAAN BAJA
1 KOLOM BAJA
- Kolom CAST. 675.200.9.14 kg
- Kolom WF 400.200.8.13 kg
- Kolom HB 300.300.10.15 kg
- Kolom WF 300.150.6,5.9 kg
- Kolom WF 200.100.5,5.8 (gewel) kg
2 BALOK BAJA
- WF 400.200.8.13 kg
- HB 300.300.10.15 kg
- WF 300.150.6,5.9 kg
2 RANGKA KUDA-KUDA
- Rafter Castela 450.150.6,5.9 kg
- Voute WF 300.150.6,5.9 kg
- Rafter WF 250.125.6.9 kg
- Voute WF 250.125.6.9 kg
- Rafter WF 200.100.5,5.8 kg
- Voute WF 200.100.5,5.8 kg
3 Tiebeam WF 200.100.5,5.8 kg
4 Dudukan Rangka Cladding UNP 150.75.6,5.10 kg
5 Gording C 150.65.20.2,3 kg
6 Rangka Cladding C 150.65.20.2,3 kg
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
E - II PEKERJAAN PONDASI
1 Supply Tiang Pancang 250x250 mm m'
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
2 Pemancangan m'
3 Potong Kepala tiang titik
II RETAINING WALL
1 RETAINING WALL 8
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
III SLOOF
1 SL-40 A
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting Bataco m2
2 SL-50 A
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting Bataco m2
3 SL-50 B
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting Bataco m2
IV KOLOM
1 KOLOM K-350
- Beton f'c 25 m3
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
2 KOLOM K-450
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
SUB TOTAL PEKERJAAN E-III
E - IV PEKERJAAN BAJA
1 KOLOM BAJA
- Kolom WF 350.175.7.11 kg
- Kolom WF 250.125.6.9 kg
2 RANGKA KUDA-KUDA
- Rafter Castela 450.150.6,5.9 (WF 300.150.6,5.9) kg
- Voute WF 300.150.6,5.9 kg
- Rafter WF 250.125.6.9 kg
- Voute WF 250.125.6.9 kg
- Rafter WF 200.100.5,5.8 kg
- Voute WF 200.100.5,5.8 kg
3 Tiebeam WF 200.100.5,5.8 kg
4 Dudukan Rangka Cladding UNP 150.75.6,5.10 kg
5 Gording C 150.65.20.2,3 kg
6 Rangka Cladding C 150.65.20.2,3 kg
7 Rangka Listplank C 100.50.20.2,3 kg
9 Bracing Kolom L 60.60.6 kg
10 Penggantung Talang L 40.40.4 kg
11 Penggantung Talang Datar Plat Strip 40.4 kg
12 Begel talang turun plat strip 3x30 mm per jarak 1.50 m kg
14 Plat baja t= 12 mm kg
15 Plat baja t= 10 mm kg
16 Plat baja t= 8 mm kg
17 Plat baja t= 6 mm kg
18 Angkur Æ 19 mm ; L= 760 - U-50 bh
19 Angkur Æ 16 mm ; L= 650 - U-50 bh
20 Murbaut Æ 12 mm bh
21 Murbaut Æ 16 mm - A325 bh
22 Murbaut Æ 19 mm - A325 bh
24 Trekstang Æ 12 mm bh
25 Ikatan angin Æ 16 mm bh
26 Jarum keras Æ 16 mm bh
27 Sandblasting - Standart SA 2.5 kg
28 Cat baja F Talit ex. Kansai kg
F GROUND TANK
F-I PEKERJAAN TANAH
1 Galian tanah m3
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
2 Urug kembali m3
3 Buang tanah m3
4 Urugan Sirtu + Pemadatan m3
F - II PEKERJAAN PONDASI
2 Supply Tiang Pancang 250x250 mm m'
3 Pemancangan m'
4 Potong Kepala tiang titik
II BALOK
1 B-30
- Lantai kerja B0 m3
- Beton fc' 30 m3
- Besi U - 24 kg
- Besi U - 40 kg
- Bekisting Bataco m2
2 B-40A
- Lantai kerja B0 m3
- Beton fc' 30 m3
- Besi U - 24 kg
- Besi U - 40 kg
- Bekisting Bataco m2
3 B-40B
- Lantai kerja B0 m3
- Beton fc' 30 m3
- Besi U - 24 kg
- Besi U - 40 kg
- Bekisting Bataco m2
4 CL-40
- Lantai kerja B0 m3
- Beton fc' 30 m3
- Besi U - 24 kg
- Besi U - 40 kg
- Bekisting Bataco m2
- Lantai kerja Bo m3
- Beton fc' 30 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
IV KOLOM
1 KOLOM K-30
- Beton fc' 30 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
SUB TOTAL PEKERJAAN F-III
SUB TOTAL PEKERJAAN F
G R. GENSET
G- I PEKERJAAN TANAH
1 Galian tanah m3
2 Urug kembali m3
3 Buang tanah m3
4 Urugan Sirtu + Pemadatan m3
G - II PEKERJAAN PONDASI
1 Supply Tiang Pancang 250x250 mm m'
2 Pemancangan m'
3 Potong Kepala tiang titik
II PONDASI GENSET
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 24 kg
- Besi U - 40 kg
- Bekisting Bataco m2
PONDASI TRAFO
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 24 kg
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
- Besi U - 40 kg
- Bekisting Bataco m2
R. GENSET
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 24 kg
- Besi U - 40 kg
- Bekisting Bataco m2
III SLOOF
1 SL-50 A
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting Bataco m2
2 SL-50 B
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting Bataco m2
IV BALOK
B-50A
- Lantai kerja Bo m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
B-50B
- Lantai kerja Bo m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
LS-40
- Lantai kerja Bo m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
V PLAT LANTAI
LANTAI EV - 0.50
- Lantai kerja Bo m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
LANTAI EV +3.25
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
- Lantai kerja Bo m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
VI KOLOM
1 KOLOM K-30
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
SUB TOTAL PEKERJAAN G-III
H- II PEKERJAAN BETON
1 SALURAN A
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting m2
- Siku L 40.40.4 kg
- Penebalan pengatur level m2
2 SALURAN A
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting m2
- Siku L 40.40.4 kg
- Penebalan pengatur level m2
I - II PEKERJAAN PONDASI
1 Supply Tiang Pancang 250x250 mm m'
2 Pemancangan m'
3 Potong Kepala tiang titik
2 WC
I RETAINING WALL 9
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
- Batu kali m3
II PLAT LANTAI
PLAT LANTAI S1 (-0.05M)
- Lantai kerja Bo m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
3 TANGGA
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
- Underla m3
4 RAMP
I RETAINING WALL RAMP A AS D/4-5
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
- Batu kali m3
- Lantai kerja B0 m3
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
- Batu kali m3
I - IV PEKERJAAN BAJA WC
1 KOLOM BAJA
- Kolom WF 150.75.5.7 kg
2 RANGKA KUDA-KUDA
- WF 150.75.5.7 kg
- Voute WF 150.75.5.7 kg
3 Tiebeam WF 150.75.5.7 kg
5 Gording C 125.50.20.2,3 kg
7 Rangka Listplank C 75.40.20.2 kg
10 Penggantung Talang L 40.40.4 kg
11 Penggantung Talang Datar Plat Strip 40.4 kg
12 Begel talang turun plat strip 3x30 mm per jarak 1.50 m kg
16 Plat baja t= 8 mm kg
17 Plat baja t= 6 mm kg
19 Angkur Æ 16 mm ; L= 300 U-40 bh
20 Murbaut Æ 12 mm bh
21 Murbaut Æ 16 mm - A325 bh
24 Trekstang Æ 12 mm bh
25 Ikatan angin Æ 16 mm bh
26 Jarum keras Æ 16 mm bh
27 Sandblasting - Standart SA 2.5 kg
28 Cat baja F Talit ex. Kansai kg
J PEKERJAAN LAIN-LAIN
1 - Kolom WF 250.125.6.9 (Bangunan Office) kg 612.08
2 KOLOM K-400 (Bangunan Gudang Bahan Baku (AS. 3 - 13)
- Beton f'c 25 m3
- Besi U - 40 kg
- Bekisting multiplek 12 mm ( expose ) m2
RENCANA ANGGARAN BIAYA
PROYEK : PT. DHARMA NYATA PRESS
PEKERJAAN : GEDUNG PERCETAKAN DAN GUDANG - JOMBANG
Note :
Mohon tidak merubah Format BQ, Apabila ada pekerjaan atau item yang belum tercantum silahkan dimasukkan
dalam pekerjaan lain-lain
RENCANA ANGGARAN BIAYA
PEMILIK : PT. DHARMA NYATA PRESS
PROYEK : JL. CENDRAWASIH - JOMBANG
PEKERJAAN : FINISHING ARSITEKTUR
SATUAN HARGA
JUMLAH
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME HARGA JUMLAH
SATUAN HARGA
JUMLAH
SATUAN HARGA
JUMLAH
2 Pekerjaan Lantai
- Keramik Lobby Granito 60x60 Pearl White ex Granito m2 42.09
- Keramik 40x40 area Office ex Platinum m2 195.44
- Keramik 40x40 area Tangga Utama ex Platinum m2 20.27
- Plin Lantai 10x60 Granito ex Granito m'
- Plin Lantai 10x40 Platinum ex Platinum m'
3 Pek Cat
- Cat dinding + kolom interior ex Dulux Pentalite m2
- Cat Plafon dak interior ex Dulux Pentalite m2
- Cat exterior ex Dulux weathershield m2
- Cat Partisi Gypsum,Calsiboard ex Dulux Pentalite m2
5 Plafon
- Plafon Calsioard 6mm ex Kalsiboard m2
- Plafon Gypsum 9mm ex Jayaboard m2
- List Plafon Shadow line ex Jayaboard m'
- Cat Plafond Gypsum, Calsiboard ex Dulux Pentalite m2
JUMLAH LANTAI 1
I.2 LANTAI 2
1 Pekerjaan Pasangan Dinding
- bata ringan ex Citicon, setara m2
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME HARGA JUMLAH
SATUAN HARGA
2 Pekerjaan Lantai
- Keramik 40x40 area Office ex Platinum m2
- Keramik 40x40 area Tangga Utama ex Platinum m2
- Plin Lantai 10x40 Platinum ex Platinum m'
3 Pek Cat
- Cat dinding + kolom interior ex Dulux Pentalite m2
- Cat Plafon dak interior ex Dulux Pentalite m2
- Cat exterior ex Dulux weathershield m2
- Cat Partisi Gypsum,Calsiboard ex Dulux Pentalite m2
5 Plafon
- Plafon Calsioard 6mm ex Kalsiboard m2
- Plafon Gypsum 9mm ex Jayaboard m2
- List Plafon Shadow line ex Jayaboard m'
- Cat Plafond Gypsum, Calsiboard ex Dulux Pentalite m2
JUMLAH LANTAI 2
2 Pekerjaan Lantai
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME HARGA JUMLAH
SATUAN HARGA
3 Pek Cat
- Cat dinding + kolom interior ex Catylac m2
- Cat exterior ex Dulux weathershield m2
2 Pekerjaan Lantai
- Floorhardener 5kg/m2 natural ex Sika , Fosroc m2
- Epoxy t=500 mikron ex Sika , Fosroc m2
3 Pek Cat
- Cat dinding + kolom interior ex Catylac m2
- Cat exterior ex Dulux weathershield m2
III.2 LANTAI 2
1 Pekerjaan Pasangan Dinding
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME HARGA JUMLAH
SATUAN HARGA
2 Pekerjaan Lantai
- Epoxy t=500 mikron ex Sika , Fosroc m2
3 Pek Cat
- Cat dinding + kolom interior ex Catylac m2
- Cat exterior ex Dulux weathershield m2
PERCETAKAN AS.13-19
2 Pekerjaan Lantai
- Floorhardener 5kg/m2 natural ex Sika , Fosroc
3 Pek Cat
- Cat dinding + kolom interior ex Catylac m2
- Cat exterior ex Dulux weathershield m2
SATUAN HARGA
I PEKERJAAN ALUMUNIUM
I OFFICE AS.1-3
I.1 LANTAI 1
1 Pintu P1 Ex Atlantik unit
2 Pintu P2 Dilengkapi Door Closser unit
3 Pintu P3 Ex Atlantik unit
4 Pintu P4 Ex Atlantik unit
5 Pintu P5 Ex Atlantik unit
6 Pintu PJ1 Dilengkapi Door Closser unit
7 Pintu PJ2 Dilengkapi Door Closser unit
8 Pintu PJ3 Dilengkapi Door Closser unit
9 Pintu PJ4 Dilengkapi Door Closser unit
10 Pintu PJ5 Dilengkapi Door Closser unit
11 Jendela J1 unit
12 Jendela J2 unit
13 Jendela J3 unit
14 Jendela J4 unit
15 Jendela J5 unit
16 Jendela J6 unit
17 Jendela J7 unit
18 Jendela J8 unit
19 Jendela J9 unit
20 Jendela J10 unit
21 Jendela J11 unit
22 Jendela J12 unit
23 Jendela J13 unit
24 Jendela J14 unit
25 Jendela J15 unit
26 Jendela J16 unit
JUMLAH LANTAI 1
I.2 LANTAI 2
1 Pintu P2 Dilengkapi Door Closser unit
2 Pintu PJ6 Dilengkapi Door Closser unit
3 Pintu PJ7 Dilengkapi Door Closser unit
4 Pintu PJ8 Dilengkapi Door Closser unit
5 Jendela J22 unit
6 Jendela J23 unit
7 Jendela J24 unit
8 Jendela J25 unit
9 Jendela J26 unit
10 Jendela J26' unit
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME HARGA JUMLAH
SATUAN HARGA
JUMLAH LANTAI 2
JUMLAH LANTAI 1
III.2 LANTAI 2
1 Jendela J34 unit
JUMLAH LANTAI 2
J PEKERJAAN POWERHOUSE
NO URAIAN PEKERJAAN SPESIFIKASI SAT VOLUME HARGA JUMLAH
SATUAN HARGA
L PEKERJAAN HALAMAN
1 Pagar Panel Beton
2 Pekerjaan Pembentukan Lahan
- Pemadatan eksisting
- Onderlaag + pengunci 15/20
- Pasang Paving K500 t=10cm Ex Focon setara
- Kanstin Ex Focon setara
TOTAL PEK HALAMAN
SATUAN HARGA
Note :
Mohon tidak merubah Format BQ, Apabila ada pekerjaan atau item yang belum tercantum pada Format BQ
silahkan dimasukkan dalam pekerjaan lain-lain.
Segala sesuatu berkaitan dengan warna, model, dan type harus diasistensikan dahulu kepada owner.
Kontraktor berkewajiban : menambah, melengkapi,memperkuat pekerjaan yang ditawarkan (struktur & arsitektur)
sehingga hasil akhir pekerjaan dapat berfungsi dengan baik dan sempurna, walaupun di gambar dan BQ belum ada.