DAFTAR HARGA
SATUAN DASAR BAHAN, PERALATAN DAN UPAH TENAGA (BASIC PRICE)
UNTUK PEMBANGN RUMAH
WILAYAH JAKARTA
1 2 3 4
I. URAIAN BAHAN
A PASIR, BATU DAN SEMEN
1. Pasir pasang m 249,780.00
2. Pasir beton m 248,770.00
3. Pasir urug m 248,706.00
4. Sirtu m 237,740.00
5. Tanah merah m 177,500.00
6. Abu batu m 231,084.00
7. Batu kali m 245,015.00
8. Batu belah 15/20 m 245,015.00
9. Batu pecah 5/7 m 238,167.00
10. Batu pecah/split 3/5 m 238,167.00
11. Batu pecah/split 2/3 m 249,560.00
12. Batu pecah/split 1/2 m 248,730.00
13. Batu pecah/split 0,5/1 m 251,790.00
14. Bata merah proses tangan bh 500.00
15. Bata merah bh 508.00
16. Batako bh 2,318.00
17. Hebel uk.60x20x7,5 bh 7,570.80
18. Hebel uk.60x20x10 bh 10,113.60
19. Hollow block HB. 20 bh 5,790.00
20. Hollow block HB. 15 bh 4,340.00
21. Hollow block HB. 10 bh 2,900.00
22. Roster beton 20 x 20 x 7 bh 7,012.00
23. Roster bata merah 12 x 24 x 10 bh 5,058.00
24. Glass block 20 x 20 x 10 bh 20,350.00
25. Paving abu-abu segi enam, tebal 8 cm m 78,322.00
26. Paving merah/hitam segi enam, tebal 8 cm m 108,762.00
27. Grassblock m 302,526.00
28. Kanstin abu-abu 15 x 25 x 40 bh 29,231.00
29. Kanstin abu-abu saluran 15 x 30 x 40 bh 55,126.00
30. Batu palimanan m 95,267.00
31. Batu paras m 97,584.00
32. Semen portland kg 1,264.00
33. Semen putih Tiga Roda kg 1,608.00
34. Semen warna kg 12,430.00
35. Koral beton m 248,730.00
36. Perekat MU-380 (perekat) kg 3,950.00
37. Perekat MU-100 (plesteran) kg 1,925.00
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
9. Plint ubin pc 15 x 20 bh -
10. Plint ubin pc warna 10 x 40 bh -
11. Plint ubin pc warna 10 x 30 bh -
12. Plint ubin pc warna 10 x 20 bh -
1. Marmer m 235,830.00
2. Plint ubin marmer 10 x 60 bh 13,945.00
3. Plint ubin marmer 10 x 40 bh 9,000.00
4. Plint ubin marmer 10 x 30 bh 6,835.00
5. Granito tile 40x40 cm bh 39,030.00
6. Plint granito tile 10x40 cm bh 11,580.00
7. Granito tile 30x30 cm bh 18,390.00
8. Plint granito tile 10x30 cm bh 6,450.00
9. Ubin keramik 60 x 60 cm Indogress bh 137,816.00
10. Ubin keramik 40 x 40 cm Roman bh 17,200.00
11. Ubin keramik 30 x 30 cm Roman bh 5,595.00
12. Ubin keramik 20 x 20 cm Roman bh 3,040.00
13. Ubin keramik 20 x 25 cm Roman bh 4,085.00
14. Ubin keramik 5 x 20 cm Roman bh 880.00
15. Ubin keramik 40 x 40 cm biasa bh 7,325.00
16. Ubin keramik 30 x 30 cm biasa bh 3,538.00
17. Ubin keramik 20 x 20 cm biasa bh 2,070.00
18. Ubin keramik 20 x 25 cm biasa bh 2,353.00
19. Ubin keramik 5 x 20 cm biasa bh 620.00
20. Plint keramik 10x40 cm bh 4,282.00
21. Plint keramik 10x30 cm bh 3,282.00
22. Plint keramik 10x20 cm bh 3,032.00
23. Plint keramik 10x60 cm bh 13,790.00
24. Stepnosing bh 12,234.00
25. Vinyl karet 30 x 30 cm kl 1 bh 5,575.00
26. Vinyl karet 30 x 30 cm kl 2 bh 4,750.00
27. Parquet m 373,035.00
28. Floor Hardener PM-700 kg 2,850.00
F BAHAN PENUTUP ATAP
1. Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 41,045.00
2. Seng gelombang 3x6 ft BJLS 25 (0,25 mm) Lbr 58,050.00
3. Seng gelomb.Galvanish 3x6 ft (0,30 mm) Lbr 61,410.00
4. Seng gelomb.Zincalume 3x6 ft (0,30 mm) Lbr 106,960.00
5. Seng plat 3x6 ft BJLS 20 (0,2 mm) Lbr 34,730.00
6. Seng plat 3x6 ft BJLS 25 (0,25 mm) Lbr 44,970.00
7. Seng plat 3x6 ft BJLS 28 (0,28 mm) Lbr 60,940.00
8. Genteng plentong kecil natural bh 1,252.00
9. Genteng plentong super/besar bh 2,182.00
10. Genteng morando natural bh 2,683.00
11. Genteng morando glazzur bh 3,293.00
12. Genteng kodok natural bh 2,170.00
1 2 3 4
1 2 3 4
1 2 3 4
54. glassbead kg -
H PAKU
1. Paku biasa 2"-5" kg 16,436.00
2. Paku biasa 1/2"- 1" kg 20,935.00
3. Paku sekrup 3,5" bh 1,240.00
4. Paku sekrup kg 17,273.00
5. Paku beton kg 16,606.00
6. Paku asbes bh 475.00
7. Paku seng kg 22,420.00
8. Baut 16 bh 7,500.00
9. Baut 12 bh 6,840.00
10. Angkur 19 bh 31,430.00
11. Angkur pengikat atap bh 1,135.00
I BAHAN PIPA
1. Pipa galvanis dia 1/2" m' 18,630.00
2. Pipa galvanis dia 3/4" m' 26,180.00
3. Pipa galvanis dia 1" m' 36,167.00
4. Pipa galvanis dia 1 " m' 44,435.00
5. Pipa galvanis dia 1 " m' 49,815.00
6. Pipa galvanis dia 2" m' 69,215.00
7. Pipa galvanis hitam dia 2" untuk pagar m' 52,590.00
8. Pipa galvanis dia 2 " m' 116,187.00
9. Pipa galvanis dia 3" m' 191,367.00
10. Pipa galvanis dia 4" m' 263,640.00
11. Pipa PVC dia 1/2" AW m' 6,000.00
12. Pipa PVC dia 3/4" AW m' 7,604.00
13. Pipa PVC dia 1" AW m' 10,200.00
14. Pipa PVC dia 1 " AW m' 14,618.00
15. Pipa PVC dia 1 " D m' 7,908.00
16. Pipa PVC dia 1 " AW m' 18,006.00
17. Pipa PVC dia 1 " D m' 7,306.00
18. Pipa PVC dia 2" AW m' 22,992.00
19. Pipa PVC dia 2" D m' 11,626.00
20. Pipa PVC dia 2 " AW m' 31,490.00
21. Pipa PVC dia 2 " D m' 16,350.00
22. Pipa PVC dia 3" AW m' 44,220.00
23. Pipa PVC dia 3" D m' 19,672.00
24. Pipa PVC dia 4" AW m' 75,904.00
25. Pipa PVC dia 4" D m' 32,174.00
26. Pipa PVC dia 6" AW m' 176,134.00
27. Pipa PVC dia 6" D m' 60,890.00
26. Buis beton dia 100 panj. 50 cm bh 189,080.00
27. Buis beton dia 80 panj. 50 cm bh 179,155.00
28. Buis beton dia 60 panj. 100 cm bh 165,375.00
29. Buis beton dia 50 panj. 100 cm bh 110,530.00
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
Keterangan:
1. Data harga bahan dan upah diperoleh dari survei pasar, Journal Harga Bahan dan Harga Satuan Bahan & Upah Pemda.
2. Data yang diperoleh dari survei pasar dimasukkan dalam kolom 6 s/d 11.
3. Data yang diperoleh dari Journal Harga Bahan dimasukkan dalam kolom 5.
4. Harga-harga dari kolom 5 s/d 11 tersebut diambil nilai rata-ratanya dan dimasukkan dalam kolom 4. Nilai harga dalam kolom 4 ini yang d
5. Singkatan:
m' = meter panjang/lari
m = meter persegi
m = meter kubik
dia. = diameter
btg = batang
Ltr = liter
kg = kilogram
bh = buah
Lbr = lembar
zak = karung
Oh = orang hari
BJLS = Baja Lembaran Lapis Seng
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
Hal. 511
KETERANGAN
nya dan dimasukkan dalam kolom 4. Nilai harga dalam kolom 4 ini yang dipakai sebagai pedoman.
A PEKERJAAN PENDAHULUAN
1. Pagar sementara dari seng gelombang tinggi 2 meter tiap 1 m'
Harga bahan:
- Kayu dolken 8-10/400 cm btg 1.250 25,792
- Semen portland kg 2.500 1,264
- Pasir beton m 0.005 248,770
- Batu pecah/split 2/3 m 0.009 249,560
- Kayu Meranti Palembang kaso m 0.072 4,275,200
- Paku biasa 2"-5" kg 0.060 16,436
- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.200 41,045
- Cat meni besi kg 0.450 27,885
Upah tenaga:
- Pekerja Oh 0.400 98,019
- Tukang kayu Oh 0.200 115,441
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.020 150,382
2. Pagar sementara dari kawat duri tinggi 1,8 meter tiap 1 m'
Harga bahan:
- Kayu dolken 8-10/400 cm btg 1.000 25,792
- Semen portland kg 2.000 1,264
- Pasir beton m 0.005 248,770
- Batu pecah/split 2/3 m 0.009 249,560
- Paku biasa 2"-5" kg 0.060 16,436
- Kawat duri (10kg/60m/rol) kg 2.500 65,568
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang kayu Oh 0.200 115,441
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.020 150,382
3 Pagar perimeter dari kawat duri tinggi 1,5 meter tiap 1 m'
Harga bahan:
- Pipa galvanis dia 2 " btg 0.556 116,187
- Semen portland kg 2.000 1,264
- Pasir beton m 0.005 248,770
- Batu pecah/split 2/3 m 0.009 249,560
- Paku biasa 2"-5" kg 0.060 16,436
2-AHSP Hal.33/693
34
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang kayu Oh 0.200 115,441
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.020 150,382
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang kayu Oh 0.200 115,441
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.020 150,382
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 2.000 115,441
2-AHSP Hal.34/693
35
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
6. Pembuatan kantor sementara dengan lantai plesteran + meja & bangku kayu tiap 1 m
Harga bahan:
- Semen portland kg 20.000 1,264
- Pasir beton m 0.040 248,770
- Batu pecah/split 2/3 m 0.067 249,560
- Kayu Meranti Palembang kaso m 0.048 4,275,200
- Paku biasa 2"-5" kg 0.270 16,436
- Paku biasa 1/2"- 1" kg 0.079 20,935
- Triplek 4x8 ft 4 mm lbr 1.189 60,891
- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.158 41,045
- Jendela nako (rangka) daun 0.541 21,606
- Besi segi empat 3/8"x3/8" (0,83kg/m') kg 0.269 13,230
- Kaca 5 mm m 0.049 95,470
- Engsel pintu biasa/sederhana set 0.078 28,886
- Kunci tanam sederhana bh 0.078 49,102
Harga bahan untuk meja & kursi sederhana:
- Triplek 4x8 ft 6 mm lbr 0.051 83,197
- Kayu Meranti Palembang kaso m 0.010 4,275,200
- Kayu Meranti Palembang papan m 0.004 4,634,167
- Paku biasa 2"-5" kg 0.074 16,436
- Paku biasa 1/2"- 1" kg 0.007 20,935
Upah tenaga:
- Pekerja Oh 0.931 98,019
- Tukang kayu Oh 1.319 115,441
- Tukang batu Oh 0.022 115,457
- Kepala tukang Oh 0.135 132,928
- Mandor Oh 0.040 150,382
2-AHSP Hal.35/693
36
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 2.000 115,441
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.050 150,382
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Mandor Oh 0.050 150,382
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Mandor Oh 0.100 150,382
2-AHSP Hal.36/693
37
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,441
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.37/693
38
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
B PEKERJAAN TANAH
1. Pembersihan lapangan dan perataan tiap 1 m
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Mandor Oh 0.050 150,382
2-AHSP Hal.38/693
39
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.39/693
40
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Mandor Oh 0.010 150,382
16. Pemadatan tanah dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m
2-AHSP Hal.40/693
41
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.41/693
42
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
17. Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m
Harga pemakaian alat:
- TAMPER / HAND COMPACTOR jam 0.058 24,600
Juml
18. Pemadatan tanah dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m
19. Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m
Harga pemakaian alat:
- TAMPER / HAND COMPACTOR jam 0.096 24,600
Juml
2-AHSP Hal.42/693
43
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Mandor Oh 0.025 150,382
2-AHSP Hal.43/693
44
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Mandor Oh 0.010 150,382
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Mandor Oh 0.010 150,382
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Mandor Oh 0.010 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Mandor Oh 0.010 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Mandor Oh 0.010 150,382
2-AHSP Hal.44/693
45
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
2-AHSP Hal.45/693
46
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.500 98,019
- Tukang batu Oh 0.600 115,457
- Kepala tukang Oh 0.060 132,928
- Mandor Oh 0.075 150,382
Upah tenaga:
- Pekerja Oh 1.500 98,019
- Tukang batu Oh 0.600 115,457
- Kepala tukang Oh 0.060 132,928
- Mandor Oh 0.075 150,382
Upah tenaga:
- Pekerja Oh 1.500 98,019
- Tukang batu Oh 0.600 115,457
- Kepala tukang Oh 0.060 132,928
- Mandor Oh 0.075 150,382
2-AHSP Hal.46/693
47
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.500 98,019
- Tukang batu Oh 0.600 115,457
- Kepala tukang Oh 0.060 132,928
- Mandor Oh 0.075 150,382
2-AHSP Hal.47/693
48
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.780 98,019
- Tukang batu Oh 0.390 115,457
- Kepala tukang Oh 0.039 132,928
- Mandor Oh 0.039 150,382
Upah tenaga:
- Pekerja Oh 3.000 98,019
- Tukang batu Oh 0.850 115,457
- Kepala tukang Oh 0.085 132,928
- Mandor Oh 0.150 150,382
Upah tenaga:
- Pekerja Oh 2.380 98,019
- Tukang batu Oh 0.300 115,457
- Kepala tukang Oh 0.030 132,928
- Mandor Oh 0.080 150,382
D PEKERJAAN DINDING
1. Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps tiap 1m
2-AHSP Hal.48/693
49
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang batu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.49/693
50
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang batu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.030 150,382
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.015 150,382
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.015 150,382
2-AHSP Hal.50/693
51
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga: 0
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.015 150,382
2-AHSP Hal.51/693
52
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga: 0
- Pekerja Oh 2.900 98,019
- Tukang batu Oh 0.900 115,457
- Kepala tukang Oh 0.090 132,928
- Mandor Oh 0.136 150,382
Upah tenaga: 0
- Pekerja Oh 2.900 98,019
- Tukang batu Oh 0.900 115,457
- Kepala tukang Oh 0.090 132,928
- Mandor Oh 0.136 150,382
Upah tenaga: 0
- Pekerja Oh 0.500 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.025 150,382
2-AHSP Hal.52/693
53
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.015 150,382
2-AHSP Hal.53/693
54
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.015 150,382
Upah tenaga:
- Pekerja Oh 0.072 98,019
- Tukang batu Oh 0.022 115,457
- Kepala tukang Oh 0.002 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.174 98,019
- Tukang batu Oh 0.054 115,457
- Kepala tukang Oh 0.005 132,928
- Mandor Oh 0.008 150,382
2-AHSP Hal.54/693
55
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.015 150,382
2-AHSP Hal.55/693
56
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.360 98,019
- Tukang batu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.018 150,382
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.015 150,382
16. Pasangan dinding Roster bata merah 12 x 24 x 10 tiap 1m, spesi 1:3
Harga bahan:
- Roster bata merah 12 x 24 x 10 bh 30.000 5,058
- Semen portland kg 14.000 1,264
- Pasir pasang m 0.032 249,780
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.015 150,382
2-AHSP Hal.56/693
57
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.015 150,382
2-AHSP Hal.57/693
58
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.360 98,019
- Tukang batu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.018 150,382
E PEKERJAAN PLESTERAN
1. Plesteran 1 Pc : 2 Ps tebal 15 mm tiap 1m
Catatan: Analisis E1 s/d E14 pekerjaan plesteran sudah termasuk acian & benangan/ tali air untuk sudut & siku bangunan, kecuali
ornamen/ variasi/ skoning dihitung tersendiri. Plesteran tebal 15 mm untuk bangunan gedung & rumah; plesteran 20-30 mm untuk
Harga bahan:
- Semen portland kg 10.224 1,264
- Pasir pasang m 0.020 249,780
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang batu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.010 150,382
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang batu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.010 150,382
2-AHSP Hal.58/693
59
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang batu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.010 150,382
2-AHSP Hal.59/693
60
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.260 98,019
- Tukang batu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.013 150,382
Upah tenaga:
- Pekerja Oh 0.260 98,019
- Tukang batu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.013 150,382
Upah tenaga:
- Pekerja Oh 0.260 98,019
- Tukang batu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.013 150,382
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.200 115,457
2-AHSP Hal.60/693
61
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.013 150,382
2-AHSP Hal.61/693
62
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.013 150,382
Upah tenaga:
- Pekerja Oh 0.260 98,019
- Tukang batu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.010 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang batu Oh 0.070 115,457
- Kepala tukang Oh 0.007 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang batu Oh 0.070 115,457
- Kepala tukang Oh 0.007 132,928
2-AHSP Hal.62/693
63
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.057 98,019
- Tukang batu Oh 0.038 115,457
- Kepala tukang Oh 0.038 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.63/693
64
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.013 150,382
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.140 115,457
- Kepala tukang Oh 0.014 132,928
- Mandor Oh 0.015 150,382
17. Acian 1 m2
Harga bahan:
- Semen portland kg 3.250 1,264
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.008 150,382
2-AHSP Hal.64/693
65
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 6.000 98,019
- Tukang kayu Oh 20.000 115,457
- Kepala tukang Oh 2.000 132,928
- Mandor Oh 0.300 150,382
2-AHSP Hal.65/693
66
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2. Pasang kusen pintu dan jendela Kayu Kamper Samarinda Oven tiap 1m
Harga bahan:
- Kayu Kamper Samarinda Oven balok m 1.200 9,757,500
- Paku biasa 2"-5" kg 1.250 16,436
- Lem kayu kg 1.000 32,417
Upah tenaga:
- Pekerja Oh 6.000 98,019
- Tukang kayu Oh 18.000 115,457
- Kepala tukang Oh 2.000 132,928
- Mandor Oh 0.300 150,382
Upah tenaga:
- Pekerja Oh 6.000 98,019
- Tukang kayu Oh 18.000 115,457
- Kepala tukang Oh 2.000 132,928
- Mandor Oh 0.300 150,382
Upah tenaga:
- Pekerja Oh 6.000 98,019
- Tukang kayu Oh 18.000 115,457
- Kepala tukang Oh 2.000 132,928
- Mandor Oh 0.300 150,382
2-AHSP Hal.66/693
67
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 6.000 98,019
- Tukang kayu Oh 18.000 115,457
- Kepala tukang Oh 2.000 132,928
- Mandor Oh 0.300 150,382
2-AHSP Hal.67/693
68
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 2.500 115,457
- Kepala tukang Oh 0.250 132,928
- Mandor Oh 0.050 150,382
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 2.500 115,457
- Kepala tukang Oh 0.250 132,928
- Mandor Oh 0.050 150,382
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 2.500 115,457
- Kepala tukang Oh 0.250 132,928
- Mandor Oh 0.050 150,382
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 2.500 115,457
2-AHSP Hal.68/693
69
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 2.500 115,457
- Kepala tukang Oh 0.250 132,928
- Mandor Oh 0.050 150,382
2-AHSP Hal.69/693
70
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.800 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.040 150,382
12. Pasang pintu dan jendela kaca Kayu Kamper Samarinda Oven tiap 1m
Harga bahan:
- Kayu Kamper Samarinda Oven papan m 0.024 10,307,500
- Lem kayu kg 0.300 32,417
Upah tenaga:
- Pekerja Oh 0.800 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.040 150,382
13. Pasang pintu dan jendela kaca Kayu Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing papan m 0.024 9,057,500
- Lem kayu kg 0.300 32,417
Upah tenaga:
- Pekerja Oh 0.800 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.040 150,382
14. Pasang pintu dan jendela kaca Kayu Meranti Sampit tiap 1m
Harga bahan:
- Kayu Meranti Sampit papan m 0.024 4,634,167
- Lem kayu kg 0.300 32,417
Upah tenaga:
- Pekerja Oh 0.800 98,019
- Tukang kayu Oh 2.000 115,457
2-AHSP Hal.70/693
71
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.800 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.040 150,382
2-AHSP Hal.71/693
72
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 3.000 115,457
- Kepala tukang Oh 0.300 132,928
- Mandor Oh 0.050 150,382
17. Pasang pintu dan jendela jalusi Kayu Kamper Samarinda Oven tiap 1m
Harga bahan:
- Kayu Kamper Samarinda Oven papan m 0.064 10,307,500
- Lem kayu kg 0.500 32,417
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 3.000 115,457
- Kepala tukang Oh 0.300 132,928
- Mandor Oh 0.050 150,382
18. Pasang pintu dan jendela jalusi Kayu Kamper Singkil tiap 1m
Harga bahan:
- Kayu Kamper Singkil papan m 0.064 9,057,500
- Lem kayu kg 0.500 32,417
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 3.000 115,457
- Kepala tukang Oh 0.300 132,928
- Mandor Oh 0.050 150,382
19. Pasang pintu dan jendela jalusi Kayu Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing papan m 0.064 9,057,500
- Lem kayu kg 0.500 32,417
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 3.000 115,457
2-AHSP Hal.72/693
73
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
20. Pasang pintu dan jendela jalusi Kayu Meranti Sampit tiap 1m
Harga bahan:
- Kayu Meranti Sampit papan m 0.064 4,634,167
- Lem kayu kg 0.500 32,417
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 3.000 115,457
- Kepala tukang Oh 0.300 132,928
- Mandor Oh 0.050 150,382
2-AHSP Hal.73/693
74
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 3.000 115,457
- Kepala tukang Oh 0.300 132,928
- Mandor Oh 0.050 150,382
Upah tenaga:
- Pekerja Oh 0.500 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.025 150,382
Upah tenaga:
- Pekerja Oh 0.500 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.025 150,382
Upah tenaga:
- Pekerja Oh 0.500 98,019
- Tukang kayu Oh 2.000 115,457
2-AHSP Hal.74/693
75
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
25. Pasang pintu teakwood rangkap, rangka Kayu Kamper Samarinda oven tiap 1m
Harga bahan:
- Kayu Kamper Samarinda oven papan m 0.025 10,307,500
- Paku biasa 1/2"- 1" kg 0.030 20,935
- Lem kayu lt 0.500 32,417
- Teakwood 4x8 ft 3 mm lbr 1.000 111,450
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.75/693
76
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
26. Pasang pintu teakwood rangkap, rangka Kayu Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing papan m 0.025 9,057,500
- Paku biasa 1/2"- 1" kg 0.030 20,935
- Lem kayu lt 0.500 32,417
- Teakwood 4x8 ft 3 mm lbr 1.000 111,450
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.030 150,382
27. Pasang pintu teakwood rangkap, rangka Kayu Meranti Palembang tiap 1m
Harga bahan:
- Kayu Meranti Palembang papan m 0.025 4,634,167
- Paku biasa 1/2"- 1" kg 0.030 20,935
- Lem kayu lt 0.500 32,417
- Teakwood 4x8 ft 3 mm lbr 1.000 111,450
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.030 150,382
28. Pasang pintu triplek rangkap, rangka Kayu Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing papan m 0.025 9,057,500
- Paku biasa 1/2"- 1" kg 0.030 20,935
- Lem kayu lt 0.500 32,417
- Triplek 4x8 ft 4 mm lbr 1.000 60,891
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.030 150,382
29. Pasang pintu triplek rangkap, rangka Kayu Meranti Palembang tiap 1m
Harga bahan:
2-AHSP Hal.76/693
77
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang kayu Oh 2.000 115,457
- Kepala tukang Oh 0.200 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.77/693
78
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
30. Pasang pintu teakwood dan formika, rangka Kayu Kamper Samarinda oven tiap 1m
Harga bahan:
- Kayu Kamper Samarinda oven papan m 0.025 10,307,500
- Paku biasa 1/2"- 1" kg 0.300 20,935
- Lem kayu lt 0.800 32,417
- Teakwood 4x8 ft 3 mm lbr 1.000 111,450
- Formika 3x7 ft lbr 0.500 130,015
Upah tenaga:
- Pekerja Oh 0.800 98,019
- Tukang kayu Oh 2.500 115,457
- Kepala tukang Oh 0.250 132,928
- Mandor Oh 0.040 150,382
31. Pasang pintu teakwood dan formika, rangka Kayu Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing papan m 0.025 9,057,500
- Paku biasa 1/2"- 1" kg 0.300 20,935
- Lem kayu lt 0.800 32,417
- Teakwood 4x8 ft 3 mm lbr 1.000 111,450
- Formika 3x7 ft lbr 0.500 130,015
Upah tenaga:
- Pekerja Oh 0.800 98,019
- Tukang kayu Oh 2.500 115,457
- Kepala tukang Oh 0.250 132,928
- Mandor Oh 0.040 150,382
32. Pasang pintu teakwood dan formika, rangka Kayu Meranti Palembang tiap 1m
Harga bahan:
- Kayu Meranti Palembang papan m 0.025 4,634,167
- Paku biasa 1/2"- 1" kg 0.300 20,935
- Lem kayu lt 0.800 32,417
- Teakwood 4x8 ft 3 mm lbr 1.000 111,450
- Formika 3x7 ft lbr 0.500 130,015
Upah tenaga:
- Pekerja Oh 0.800 98,019
- Tukang kayu Oh 2.500 115,457
- Kepala tukang Oh 0.250 132,928
- Mandor Oh 0.040 150,382
2-AHSP Hal.78/693
79
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
33. Pasang pintu triplek dan formika, rangka Kayu Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing papan m 0.025 9,057,500
- Paku biasa 1/2"- 1" kg 0.300 20,935
- Lem kayu lt 0.800 32,417
- Triplek 4x8 ft 4 mm lbr 1.000 111,450
- Formika 3x7 ft lbr 0.500 130,015
Upah tenaga:
- Pekerja Oh 0.800 98,019
- Tukang kayu Oh 2.500 115,457
- Kepala tukang Oh 0.250 132,928
- Mandor Oh 0.040 150,382
2-AHSP Hal.79/693
80
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
34. Pasang pintu triplek dan formika, rangka Kayu Meranti Palembang tiap 1m
Harga bahan:
- Kayu Meranti Palembang papan m 0.025 4,634,167
- Paku biasa 1/2"- 1" kg 0.300 20,935
- Lem kayu lt 0.800 32,417
- Triplek 4x8 ft 4 mm lbr 1.000 111,450
- Formika 3x7 ft lbr 0.500 130,015
Upah tenaga:
- Pekerja Oh 0.800 98,019
- Tukang kayu Oh 2.500 115,457
- Kepala tukang Oh 0.250 132,928
- Mandor Oh 0.040 150,382
35. Pasang pintu triplek dan double formika, rangka Kayu Meranti Palembang tiap 1m
Harga bahan:
- Kayu Meranti Palembang papan m 0.025 4,634,167
- Paku biasa 1/2"- 1" kg 0.300 20,935
- Lem kayu lt 1.200 32,417
- Triplek 4x8 ft 4 mm lbr 1.000 111,450
- Formika 3x7 ft lbr 1.000 130,015
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang kayu Oh 2.600 115,457
- Kepala tukang Oh 0.260 132,928
- Mandor Oh 0.050 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.80/693
81
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Harga bahan:
- Kawat nyamuk m 1.100 15,165
- Paku biasa 1/2"- 1" kg 0.020 20,935
- Kayu Kamper Medan/Kruing papan m3 0.002 4,634,167
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.81/693
82
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 4.000 98,019
- Tukang kayu Oh 12.000 115,457
- Kepala tukang Oh 1.200 132,928
- Mandor Oh 0.200 150,382
Upah tenaga:
- Pekerja Oh 4.000 98,019
- Tukang kayu Oh 12.000 115,457
- Kepala tukang Oh 1.200 132,928
- Mandor Oh 0.200 150,382
2-AHSP Hal.82/693
83
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 6.000 98,019
- Tukang kayu Oh 20.000 115,457
- Kepala tukang Oh 2.000 132,928
- Mandor Oh 0.300 150,382
2-AHSP Hal.83/693
84
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 2.400 98,019
- Tukang kayu Oh 7.200 115,457
- Kepala tukang Oh 0.720 132,928
- Mandor Oh 0.120 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.84/693
85
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.85/693
86
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
10. Pasang kaso + reng genteng beton Kayu Meranti Jambi tiap 1m
Harga bahan:
- Kayu Meranti Jambi kaso m 0.014 4,275,200
- Kayu Meranti Jambi reng m 0.006 4,303,000
- Paku biasa 2"-5" kg 0.250 16,436
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.86/693
87
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.120 98,019
- Tukang kayu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.006 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.87/693
88
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.110 98,019
- Tukang kayu Oh 0.220 115,457
- Kepala tukang Oh 0.022 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.110 98,019
2-AHSP Hal.88/693
89
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.110 98,019
- Tukang kayu Oh 0.220 115,457
- Kepala tukang Oh 0.022 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.89/693
90
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.600 98,019
2-AHSP Hal.90/693
91
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.120 98,019
- Tukang kayu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.006 150,382
2-AHSP Hal.91/693
92
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
2-AHSP Hal.92/693
93
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.008 150,382
2-AHSP Hal.93/693
94
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.160 98,019
- Tukang kayu Oh 0.260 115,457
- Kepala tukang Oh 0.026 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.160 98,019
- Tukang kayu Oh 0.260 115,457
- Kepala tukang Oh 0.026 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.160 98,019
- Tukang kayu Oh 0.260 115,457
2-AHSP Hal.94/693
95
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
10. Pasang rangka plafon (60 x 60) cm Kayu Kamper Samarinda tiap 1m
Harga bahan:
- Kayu Kamper Samarinda balok m 0.016 8,819,167
- Paku biasa 2"-5" kg 0.250 16,436
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.300 115,457
- Kepala tukang Oh 0.030 132,928
- Mandor Oh 0.010 150,382
2-AHSP Hal.95/693
96
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
11. Pasang rangka plafon (60 x 60) cm Kayu Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing balok m 0.016 8,819,167
- Paku biasa 2"-5" kg 0.250 16,436
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.300 115,457
- Kepala tukang Oh 0.030 132,928
- Mandor Oh 0.010 150,382
12. Pasang rangka plafon (60 x 60) cm Kayu Meranti Palembang tiap 1m
Harga bahan:
- Kayu Meranti Palembang balok m 0.016 4,284,500
- Paku biasa 2"-5" kg 0.250 16,436
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.300 115,457
- Kepala tukang Oh 0.030 132,928
- Mandor Oh 0.010 150,382
13. Pasang rangka plafon (30 x 60) cm Kayu Kamper Samarinda tiap 1m
Harga bahan:
- Kayu Kamper Samarinda balok m 0.023 8,819,167
- Paku biasa 2"-5" kg 0.150 16,436
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.300 115,457
- Kepala tukang Oh 0.030 132,928
- Mandor Oh 0.010 150,382
14. Pasang rangka plafon (30 x 60) cm Kayu Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing balok m 0.023 8,819,167
- Paku biasa 2"-5" kg 0.150 16,436
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.300 115,457
2-AHSP Hal.96/693
97
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
15. Pasang rangka plafon (30 x 60) cm Kayu Meranti Palembang tiap 1m
Harga bahan:
- Kayu Meranti Palembang balok m 0.023 4,284,500
- Paku biasa 2"-5" kg 0.150 16,436
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.300 115,457
- Kepala tukang Oh 0.030 132,928
- Mandor Oh 0.010 150,382
2-AHSP Hal.97/693
98
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.050 98,019
- Tukang kayu Oh 0.050 115,457
- Kepala tukang Oh 0.005 132,928
- Mandor Oh 0.003 150,382
17. List plafon bahan Kayu Kamper Samarinda papan 1x5 cm tiap 1 m'
Harga bahan:
- Kayu Kamper Samarinda papan m 0.001 9,057,500
- Paku biasa 1/2"- 1" kg 0.050 20,935
Upah tenaga:
- Pekerja Oh 0.040 98,019
- Tukang kayu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.040 98,019
- Tukang kayu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.002 150,382
19. Pasang list profil cornice gypsum lebar sampai 5 cm tiap 1 m'
Harga bahan:
- List profil cornice gypsum lebar sampai 5 cm m' 1.100 12,423
- Compound gypsum zak 0.035 61,190
- Alkasit kg 0.004 20,615
Upah tenaga:
- Pekerja Oh 0.113 98,019
2-AHSP Hal.98/693
99
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
20. Pasang list profil cornice gypsum lebar sampai 5-10 cm tiap 1 m'
Harga bahan:
- List profil cornice gypsum lebar 5-10 cm m' 1.100 18,746
- Compound gypsum zak 0.044 61,190
- Alkasit kg 0.004 20,615
Upah tenaga:
- Pekerja Oh 0.113 98,019
- Tukang gypsum Oh 0.038 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.007 150,382
2-AHSP Hal.99/693
100
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
21. Pasang list profil cornice gypsum lebar lebih dari 10 cm tiap 1 m'
Harga bahan:
- List profil cornice gypsum lebih dari 10 cm m' 1.100 24,256
- Compound gypsum zak 0.053 61,190
- Alkasit kg 0.005 20,615
Upah tenaga:
- Pekerja Oh 0.113 98,019
- Tukang gypsum Oh 0.040 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.007 150,382
Upah tenaga:
- Pekerja Oh 0.113 98,019
- Tukang gypsum Oh 0.040 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.007 150,382
Upah tenaga:
- Pekerja Oh 0.030 98,019
- Tukang kayu Oh 0.070 115,457
- Kepala tukang Oh 0.007 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.060 98,019
- Tukang kayu Oh 0.100 115,457
2-AHSP Hal.100/693
101
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.004 150,382
2-AHSP Hal.101/693
102
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang gypsum Oh 0.050 115,457
- Kepala tukang Oh 0.005 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang gypsum Oh 0.050 115,457
- Kepala tukang Oh 0.005 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang gypsum Oh 0.050 115,457
- Kepala tukang Oh 0.005 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.102/693
103
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.004 150,382
2-AHSP Hal.103/693
104
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.004 150,382
31. Penutup plafon asbes (1,00 x 1,00) m tebal 2,7 mm lengkap rangka Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing balok m 0.012 8,819,167
- Paku biasa 1/2"- 1" kg 0.110 20,935
- Plat asbes 100x100 cm 2,7 mm lbr 1.100 14,110
Upah tenaga:
- Pekerja Oh 0.180 98,019
- Tukang kayu Oh 0.320 115,457
- Kepala tukang Oh 0.032 132,928
- Mandor Oh 0.009 150,382
32. Penutup plafon triplek 4 mm (60 x 120) cm lengkap rangka Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing balok m 0.013 8,819,167
- Paku biasa 1/2"- 1" kg 0.160 20,935
- Triplek 4x8 ft 4 mm lbr 0.364 60,891
Upah tenaga:
- Pekerja Oh 0.260 98,019
- Tukang kayu Oh 0.310 115,457
- Kepala tukang Oh 0.031 132,928
- Mandor Oh 0.013 150,382
33. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tiap (6mx6m) = 36 m
Harga bahan:
- Paku peluru ramset bh 14.000 2,430
- Hollow 4x4 cm tbl 0.4 mm meni btg 16.500 30,870
- Hollow 2x4 cm tbl 0.35 mm btg 15.510 24,200
- Paku beton kg 0.357 16,606
2-AHSP Hal.104/693
105
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 9.360 98,019
- Tukang alumunium Oh 9.360 115,457
- Tukang gypsum Oh 1.800 115,457
- Kepala tukang Oh 1.116 132,928
- Mandor Oh 0.468 150,382
2-AHSP Hal.105/693
106
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
34. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tebal 0.3 mm / tiap 1 m
Harga bahan:
- Paku peluru ramset bh 0.390 2,430
- Hollow 4x4 cm tbl 0.4 mm meni btg 0.459 30,870
- Hollow 2x4 cm tbl 0.35 mm btg 0.431 24,200
- Paku beton kg 0.010 16,606
- Sekrup 6x1-1,5 bh 14.000 1,550
- Gypsumboard 120x240 cm 9 mm lbr 0.364 69,318
- Sekrup gypsum bh 21.000 813
- Textile tape rol 0.024 16,980
- Compound gypsum zak 0.020 61,190
- Amplas lbr 0.100 3,420
Upah tenaga:
- Pekerja Oh 0.260 98,019
- Tukang alumunium Oh 0.260 115,457
- Tukang gypsum Oh 0.050 115,457
- Kepala tukang Oh 0.031 132,928
- Mandor Oh 0.013 150,382
35. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tebal 0.6 mm / tiap 1 m
Harga bahan:
- Paku peluru ramset bh 0.390 2,430
- Hollow 4x4 cm tbl 0.6 mm btg 0.459 51,825
- Hollow 2x4 cm tbl 0.6 mm btg 0.431 39,690
- Paku beton kg 0.010 16,606
- Sekrup 6x1-1,5 bh 14.000 1,550
- Gypsumboard 120x240 cm 9 mm lbr 0.364 69,318
- Sekrup gypsum bh 21.000 813
- Textile tape rol 0.024 16,980
- Compound gypsum zak 0.020 61,190
- Amplas lbr 0.100 3,420
Upah tenaga:
- Pekerja Oh 0.260 98,019
- Tukang alumunium Oh 0.260 115,457
- Tukang gypsum Oh 0.050 115,457
- Kepala tukang Oh 0.031 132,928
- Mandor Oh 0.013 150,382
36. Penutup plafon GRC-board 4 mm lengkap dgn rangka hollow tebal 0.6 mm / tiap 1 m
Harga bahan:
- Paku peluru ramset bh 0.390 2,430
2-AHSP Hal.106/693
107
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.260 98,019
- Tukang alumunium Oh 0.260 115,457
- Tukang gypsum Oh 0.050 115,457
- Kepala tukang Oh 0.031 132,928
- Mandor Oh 0.013 150,382
2-AHSP Hal.107/693
108
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
37. Penutup plafon Calsiboard 4 mm lengkap dgn rangka hollow tebal 0.6 mm / tiap 1 m
Harga bahan:
- Paku peluru ramset bh 0.390 2,430
- Hollow 4x4 cm tbl 0.6 mm btg 0.459 51,825
- Hollow 2x4 cm tbl 0.6 mm btg 0.431 39,690
- Paku beton kg 0.010 16,606
- Sekrup 6x1-1,5 bh 14.000 1,550
- Calsiboard 120x240 cm 4 mm lbr 0.364 73,320
- Sekrup gypsum bh 21.000 813
- Textile tape rol 0.024 16,980
- Compound GRC zak 0.020 61,190
- Amplas lbr 0.100 3,420
Upah tenaga:
- Pekerja Oh 0.260 98,019
- Tukang alumunium Oh 0.260 115,457
- Tukang gypsum Oh 0.050 115,457
- Kepala tukang Oh 0.031 132,928
- Mandor Oh 0.013 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang gypsum Oh 0.500 115,457
- Kepala tukang Oh 0.050 132,928
- Mandor Oh 0.008 150,382
39. Plafond Papan (Lambriziring) 10 cm, tebal 1 cm + Rangka Kayu Borneo Super tiap 1 m2
Harga bahan:
- Kayu Borneo balok bh 0.020 6,791,875
- Paku biasa 2"-5" btg 0.200 16,436
- Kayu Kamper Samarinda oven papan btg 0.020 10,307,500
Upah tenaga:
- Pekerja Oh 0.350 98,019
- Tukang kayu Oh 0.050 115,457
- Kepala tukang Oh 0.031 132,928
2-AHSP Hal.108/693
109
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- pekerja org/hr 0.190 98,019
- tukang batu m2 0.190 115,457
- kepala tukang org/hr 0.019 132,928
- mandor org/hr 0.014 150,382
2-AHSP Hal.109/693
110
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.450 115,457
- Kepala tukang Oh 0.045 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.450 115,457
- Kepala tukang Oh 0.045 132,928
- Mandor Oh 0.008 150,382
3. Pasang dinding pemisah teakwood rangkap rangka Kayu Kamper Medan/Kruing tiap 1m
Harga bahan:
- Kayu Kamper Medan/Kruing balok m 0.028 8,819,167
- Paku biasa 2"-5" kg 0.150 16,436
- Lem kayu lt 0.560 32,417
- Teakwood 4x8 ft 3 mm lbr 0.860 112,235
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.600 115,457
- Kepala tukang Oh 0.060 132,928
- Mandor Oh 0.010 150,382
4. Pasang dinding pemisah teakwood rangkap rangka Kayu Meranti Palembang tiap 1m
Harga bahan:
- Kayu Meranti Palembang balok m 0.028 4,284,500
- Paku biasa 2"-5" kg 0.150 16,436
2-AHSP Hal.110/693
111
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.600 115,457
- Kepala tukang Oh 0.060 132,928
- Mandor Oh 0.010 150,382
2-AHSP Hal.111/693
112
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.025 98,019
- Tukang kayu Oh 0.075 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.025 98,019
- Tukang kayu Oh 0.075 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.025 98,019
- Tukang kayu Oh 0.075 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.025 98,019
- Tukang kayu Oh 0.075 115,457
2-AHSP Hal.112/693
113
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.113/693
114
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang gypsum Oh 0.300 115,457
- Tukang alumunium Oh 0.200 115,457
- Mandor Oh 0.015 150,382
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang gypsum Oh 0.300 115,457
- Tukang alumunium Oh 0.200 115,457
- Mandor Oh 0.015 150,382
2-AHSP Hal.114/693
115
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.600 115,457
- Mandor Oh 0.010 150,382
2-AHSP Hal.115/693
116
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
J PEKERJAAN BETON
1. Beton Non Struktur 1Pc : 3Ps : 5Kr - untuk rabatan/ beton tumbuk tiap 1m
Harga bahan:
- Semen portland kg 218.000 1,264
- Pasir beton m 0.520 248,770
- Batu pecah/split 2/3 m 0.870 249,560
Upah tenaga:
- Pekerja Oh 1.650 98,019
- Tukang batu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.080 150,382
2. Lantai Kerja Beton 1Pc : 3Ps : 5Kr - untuk beton tumbuk tebal 5 cm
Harga bahan:
- Semen portland kg 10.000 1,264
- Pasir beton m 0.026 248,770
- Batu pecah/split 2/3 m 0.044 249,560
Upah tenaga:
- Pekerja Oh 1.150 98,019
- Tukang batu Oh 0.020 115,457
- Kepala tukang Oh 0.002 132,928
- Mandor Oh 0.006 150,382
2-AHSP Hal.116/693
117
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.650 98,019
- Tukang batu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.080 150,382
2-AHSP Hal.117/693
118
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.650 98,019
- Tukang batu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.080 150,382
Upah tenaga:
- Pekerja Oh 2.000 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.100 150,382
Upah tenaga:
- Pekerja Oh 2.000 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.100 150,382
2-AHSP Hal.118/693
119
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 2.000 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.100 150,382
2-AHSP Hal.119/693
120
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 2.000 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.100 150,382
Upah tenaga:
- Pekerja Oh 2.000 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.100 150,382
Upah tenaga:
- Pekerja Oh 6.000 98,019
- Tukang batu Oh 1.000 115,457
- Kepala tukang Oh 0.100 132,928
- Mandor Oh 0.300 150,382
2-AHSP Hal.120/693
121
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.007 98,019
- Tukang besi Oh 0.007 115,441
- Kepala tukang Oh 0.001 132,928
- Mandor Oh 0.000 150,382
Upah tenaga:
- Pekerja Oh 0.007 98,019
- Tukang besi Oh 0.007 115,441
- Kepala tukang Oh 0.001 132,928
- Mandor Oh 0.000 150,382
2-AHSP Hal.121/693
122
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.520 98,019
- Tukang kayu Oh 0.260 115,457
- Kepala tukang Oh 0.026 132,928
- Mandor Oh 0.026 150,382
Upah tenaga:
- Pekerja Oh 0.520 98,019
- Tukang kayu Oh 0.260 115,457
- Kepala tukang Oh 0.026 132,928
- Mandor Oh 0.026 150,382
Upah tenaga:
- Pekerja Oh 0.520 98,019
- Tukang kayu Oh 0.260 115,457
- Kepala tukang Oh 0.026 132,928
- Mandor Oh 0.026 150,382
2-AHSP Hal.122/693
123
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.660 98,019
- Tukang kayu Oh 0.330 115,457
- Kepala tukang Oh 0.033 132,928
- Mandor Oh 0.033 150,382
2-AHSP Hal.123/693
124
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.660 98,019
- Tukang kayu Oh 0.330 115,457
- Kepala tukang Oh 0.033 132,928
- Mandor Oh 0.033 150,382
Upah tenaga:
- Pekerja Oh 0.660 98,019
- Tukang kayu Oh 0.330 115,457
- Kepala tukang Oh 0.033 132,928
- Mandor Oh 0.033 150,382
Upah tenaga:
- Pekerja Oh 0.660 98,019
- Tukang kayu Oh 0.330 115,457
- Kepala tukang Oh 0.033 132,928
2-AHSP Hal.124/693
125
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.660 98,019
- Tukang kayu Oh 0.330 115,457
- Kepala tukang Oh 0.033 132,928
- Mandor Oh 0.033 150,382
2-AHSP Hal.125/693
126
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 3.500 98,019
- Tukang kayu Oh 10.500 115,457
- Kepala tukang Oh 1.050 132,928
- Mandor Oh 0.175 150,382
Upah tenaga:
- Pekerja Oh 2.200 98,019
- Tukang kayu Oh 3.500 115,457
- Kepala tukang Oh 0.350 132,928
- Mandor Oh 0.120 150,382
Upah tenaga:
- Pekerja Oh 5.300 98,019
- Tukang batu Oh 0.275 115,457
- Tukang kayu Oh 1.300 115,457
- Tukang besi Oh 1.050 115,441
- Kepala tukang Oh 0.262 132,928
- Mandor Oh 0.265 150,382
2-AHSP Hal.126/693
127
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.127/693
128
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 5.650 98,019
- Tukang batu Oh 0.275 115,457
- Tukang kayu Oh 1.560 115,457
- Tukang besi Oh 1.400 115,441
- Kepala tukang Oh 0.323 132,928
- Mandor Oh 0.283 150,382
Upah tenaga:
- Pekerja Oh 7.050 98,019
- Tukang batu Oh 0.275 115,457
- Tukang kayu Oh 1.650 115,457
- Tukang besi Oh 2.100 115,441
- Kepala tukang Oh 0.403 132,928
- Mandor Oh 0.353 150,382
2-AHSP Hal.128/693
129
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.129/693
130
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 5.800 98,019
- Tukang batu Oh 0.350 115,457
- Tukang kayu Oh 2.800 115,457
- Tukang besi Oh 1.050 115,441
- Kepala tukang Oh 0.420 132,928
- Mandor Oh 0.185 150,382
2-AHSP Hal.130/693
131
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.131/693
132
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
30. Membuat 1 unit pelat pondasi beton bertulang (100 x 100 x 30) cm
Harga bahan:
- Kayu Terentang balok m 0.048 3,016,667
- Paku biasa 2"-5" kg 0.360 16,436
- Minyak Bekisting lt 0.120 2,780
- Besi beton polos kg 30.000 9,584
- Kawat beton kg 0.430 18,022
- Semen portland kg 105.000 1,264
- Pasir beton m 0.146 248,770
- Batu pecah/split 2/3 m 0.218 249,560
Upah tenaga:
- Pekerja Oh 1.160 98,019
- Tukang batu Oh 0.105 115,457
- Tukang kayu Oh 0.312 115,457
- Tukang besi Oh 0.200 115,441
- Kepala tukang Oh 0.062 132,928
- Mandor Oh 0.045 150,382
2-AHSP Hal.132/693
133
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.210 98,019
- Tukang kayu Oh 0.104 115,457
- Tukang besi Oh 0.030 115,457
- Tukang batu Oh 0.011 115,441
- Kepala tukang Oh 0.014 132,928
- Mandor Oh 0.006 150,382
2-AHSP Hal.133/693
134
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.314 98,019
- Tukang kayu Oh 0.156 115,457
- Tukang besi Oh 0.044 115,457
- Tukang batu Oh 0.016 115,441
- Kepala tukang Oh 0.022 132,928
- Mandor Oh 0.009 150,382
Upah tenaga:
- Pekerja Oh 0.498 98,019
- Tukang kayu Oh 0.208 115,457
- Tukang besi Oh 0.098 115,457
- Tukang batu Oh 0.028 115,441
- Kepala tukang Oh 0.033 132,928
- Mandor Oh 0.016 150,382
2-AHSP Hal.134/693
135
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.135/693
136
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
34. Membuat kolom penguat/praktis beton bertulang (11 x 11) cm tiap 1m'
Harga bahan:
- Kayu Terentang papan 3 cm m 0.002 4,284,500
- Paku biasa 2"-5" kg 0.010 16,436
- Besi beton polos kg 3.000 9,584
- Kawat beton kg 0.450 18,022
- Semen portland kg 4.000 1,264
- Pasir beton m 0.006 248,770
- Batu pecah/split 2/3 m 0.009 249,560
Upah tenaga:
- Pekerja Oh 0.180 98,019
- Tukang batu Oh 0.020 115,457
- Tukang kayu Oh 0.020 115,457
- Tukang besi Oh 0.020 115,441
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.009 150,382
2-AHSP Hal.136/693
137
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.137/693
138
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.648 98,019
- Tukang kayu Oh 0.396 115,457
- Tukang besi Oh 0.108 115,457
- Tukang batu Oh 0.032 115,441
- Kepala tukang Oh 0.054 132,928
- Mandor Oh 0.021 150,382
38. Membuat ring balok beton bertulang (10 x 15) cm tiap 1m'
Harga bahan:
- Kayu Terentang papan 3 cm m 0.003 4,284,500
- Paku biasa 2"-5" kg 0.020 16,436
- Besi beton polos kg 3.600 9,584
- Kawat beton kg 0.050 18,022
- Semen portland kg 5.500 1,264
- Pasir beton m 0.009 248,770
- Batu pecah/split 2/3 m 0.015 249,560
Upah tenaga:
- Pekerja Oh 0.297 98,019
- Tukang batu Oh 0.033 115,457
- Tukang kayu Oh 0.033 115,457
- Tukang besi Oh 0.033 115,441
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.015 150,382
2-AHSP Hal.138/693
139
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.139/693
140
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.647 98,019
- Tukang kayu Oh 0.330 115,457
- Tukang besi Oh 0.087 115,457
- Tukang batu Oh 0.042 115,441
- Kepala tukang Oh 0.046 132,928
- Mandor Oh 0.022 150,382
Upah tenaga:
- Pekerja Oh 0.579 98,019
- Tukang kayu Oh 0.330 115,457
- Tukang besi Oh 0.059 115,457
- Tukang batu Oh 0.035 115,441
2-AHSP Hal.140/693
141
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.141/693
142
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.347 98,019
- Tukang kayu Oh 0.165 115,457
- Tukang besi Oh 0.027 115,457
- Tukang batu Oh 0.028 115,441
- Kepala tukang Oh 0.022 132,928
- Mandor Oh 0.012 150,382
42. Plat Duiker Pintu Masuk, lebar saluran 0,5 m tiap 1 m' (Tebal plat 10 cm)
- Pekerjaan beton 1:2:3 m3 0.700 1,000,620
- Bekesting papan m2 0.500 551,140
- Besi beton dia 10 mm, 2 lapis jarak 15 cm kg 9.502 11,980
- Besi beton dia 8 mm, 2 lapis jarak 20 cm kg 2.607 11,980
43. Plat Duiker Pintu Masuk, lebar saluran 0,75 m tiap 1 m' (Tebal plat 12,5 cm)
- Pekerjaan beton 1:2:3 m3 0.119 1,000,620
- Bekesting papan m2 0.750 551,140
- Besi beton dia 10 mm, 2 lapis jarak 15 cm kg 10.859 11,980
- Besi beton dia 8 mm, 2 lapis jarak 20 cm kg 2.607 11,980
44. Plat Duiker Pintu Masuk, lebar saluran 1 m tiap 1 m' (Tebal plat 15 cm)
- Pekerjaan beton 1:2:3 m3 0.180 1,000,620
- Bekesting papan m2 1.000 551,140
- Besi beton dia 10 mm, 2 lapis jarak 15 cm kg 16.289 11,980
- Besi beton dia 8 mm, 2 lapis jarak 20 cm kg 5.214 11,980
2-AHSP Hal.142/693
143
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.075 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.008 150,382
2-AHSP Hal.143/693
144
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.060 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.075 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.060 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.060 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.008 150,382
2-AHSP Hal.144/693
145
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.010 150,382
2-AHSP Hal.145/693
146
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.140 98,019
- Tukang kayu Oh 0.075 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.140 98,019
- Tukang kayu Oh 0.075 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.140 98,019
- Tukang kayu Oh 0.070 115,457
2-AHSP Hal.146/693
147
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.140 98,019
- Tukang kayu Oh 0.070 115,457
- Kepala tukang Oh 0.007 132,928
- Mandor Oh 0.007 150,382
2-AHSP Hal.147/693
148
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.120 98,019
- Tukang kayu Oh 0.060 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.006 150,382
Upah tenaga:
- Pekerja Oh 0.080 98,019
- Tukang besi Oh 0.080 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.010 150,382
Upah tenaga:
- Pekerja Oh 0.032 98,019
- Tukang besi Oh 0.032 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.004 150,382
Upah tenaga:
- Pekerja Oh 0.140 98,019
- Tukang besi Oh 0.070 115,457
2-AHSP Hal.148/693
149
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang besi Oh 0.050 115,457
- Kepala tukang Oh 0.005 132,928
- Mandor Oh 0.008 150,382
2-AHSP Hal.149/693
150
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang besi Oh 0.050 115,457
- Kepala tukang Oh 0.005 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.400 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.400 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
2-AHSP Hal.150/693
151
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.400 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.002 150,382
2-AHSP Hal.151/693
152
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.400 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.013 150,382
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.013 150,382
2-AHSP Hal.152/693
153
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.084 98,019
- Tukang kayu Oh 0.125 115,457
- Kepala tukang Oh 0.013 132,928
- Mandor Oh 0.004 150,382
Upah tenaga:
- Pekerja Oh 0.084 98,019
- Tukang kayu Oh 0.125 115,457
- Kepala tukang Oh 0.013 132,928
- Mandor Oh 0.004 150,382
2-AHSP Hal.153/693
154
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.013 132,928
- Mandor Oh 0.004 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.070 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.006 150,382
Upah tenaga:
- Pekerja Oh 0.084 98,019
- Tukang kayu Oh 0.125 115,457
- Kepala tukang Oh 0.013 132,928
- Mandor Oh 0.004 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang besi Oh 0.070 115,457
2-AHSP Hal.154/693
155
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.070 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.006 150,382
2-AHSP Hal.155/693
156
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.500 98,019
- Tukang besi Oh 0.500 115,441
- Kepala tukang Oh 0.050 132,928
- Mandor Oh 0.003 150,382
L PEKERJAAN SANITASI
1. Memasang 1 buah kloset duduk/monoblok (sederhana)
Harga bahan:
- Kloset duduk ex RRC (sederhana) bh 1.000 723,905
- Perlengkapan (6% harga kloset) % 6.000 723,905
Upah tenaga:
- Pekerja Oh 3.300 98,019
- Tukang batu Oh 1.100 115,457
- Kepala tukang Oh 0.001 132,928
- Mandor Oh 0.160 150,382
Upah tenaga:
- Pekerja Oh 3.300 98,019
- Tukang batu Oh 1.100 115,457
- Kepala tukang Oh 0.001 132,928
- Mandor Oh 0.160 150,382
2-AHSP Hal.156/693
157
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 3.300 98,019
- Tukang batu Oh 1.100 115,457
- Kepala tukang Oh 0.001 132,928
- Mandor Oh 0.160 150,382
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang batu Oh 1.500 115,457
- Kepala tukang Oh 0.150 132,928
- Mandor Oh 0.160 150,382
2-AHSP Hal.157/693
158
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang batu Oh 1.500 115,457
- Kepala tukang Oh 0.150 132,928
- Mandor Oh 0.160 150,382
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang batu Oh 1.500 115,457
- Kepala tukang Oh 0.150 132,928
- Mandor Oh 0.160 150,382
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang batu Oh 1.000 115,457
- Kepala tukang Oh 0.100 132,928
- Mandor Oh 0.100 150,382
2-AHSP Hal.158/693
159
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Tukang batu Oh 1.000 115,457
- Kepala tukang Oh 0.100 132,928
- Mandor Oh 0.100 150,382
2-AHSP Hal.159/693
160
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.200 98,019
- Tukang batu Oh 1.450 115,457
- Kepala tukang Oh 0.150 132,928
- Mandor Oh 0.100 150,382
Upah tenaga:
- Pekerja Oh 1.800 98,019
- Tukang batu Oh 2.700 115,457
- Kepala tukang Oh 0.540 132,928
- Mandor Oh 0.110 150,382
Upah tenaga:
- Pekerja Oh 6.000 98,019
- Tukang batu Oh 3.000 115,457
- Kepala tukang Oh 0.300 132,928
- Mandor Oh 0.300 150,382
12. Memasang 1 buah bak mandi batu bata volume 0,3 m (60x60x80 cm)
Harga bahan:
- Bata merah bh 72.000 508
2-AHSP Hal.160/693
161
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.960 98,019
- Tukang batu Oh 1.330 115,457
- Kepala tukang Oh 0.133 132,928
- Mandor Oh 0.097 150,382
2-AHSP Hal.161/693
162
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.054 98,019
- Tukang pasang pipa Oh 0.090 98,019
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.054 98,019
- Tukang pasang pipa Oh 0.090 98,019
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.054 98,019
- Tukang pasang pipa Oh 0.090 98,019
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.054 98,019
- Tukang pasang pipa Oh 0.090 98,019
2-AHSP Hal.162/693
163
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.108 98,019
- Tukang pasang pipa Oh 0.180 98,019
- Kepala tukang Oh 0.018 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.163/693
164
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.108 98,019
- Tukang pasang pipa Oh 0.180 98,019
- Kepala tukang Oh 0.018 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.108 98,019
- Tukang pasang pipa Oh 0.180 98,019
- Kepala tukang Oh 0.018 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.108 98,019
- Tukang pasang pipa Oh 0.180 98,019
- Kepala tukang Oh 0.018 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.135 98,019
- Tukang pasang pipa Oh 0.225 98,019
2-AHSP Hal.164/693
165
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.036 98,019
- Tukang pasang pipa Oh 0.060 98,019
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.002 150,382
2-AHSP Hal.165/693
166
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.036 98,019
- Tukang pasang pipa Oh 0.060 98,019
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.036 98,019
- Tukang pasang pipa Oh 0.060 98,019
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.036 98,019
- Tukang pasang pipa Oh 0.060 98,019
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.036 98,019
- Tukang pasang pipa Oh 0.060 98,019
2-AHSP Hal.166/693
167
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.036 98,019
- Tukang pasang pipa Oh 0.060 98,019
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.002 150,382
2-AHSP Hal.167/693
168
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.036 98,019
- Tukang pasang pipa Oh 0.060 98,019
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.054 98,019
- Tukang pasang pipa Oh 0.090 98,019
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.054 98,019
- Tukang pasang pipa Oh 0.090 98,019
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.036 98,019
- Tukang pasang pipa Oh 0.060 98,019
2-AHSP Hal.168/693
169
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
0.054
0.003
32. Memasang pipa PVC tipe D dia 2 " tiap m'
Harga bahan:
- Pipa PVC dia 2 " D m' 1.200 16,350
- Perlengkapan (35% harga pipa) % 35.000 19,620
Upah tenaga:
- Pekerja Oh 0.036 98,019
- Tukang pasang pipa Oh 0.060 98,019
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.000 150,382
0.054
0.003
2-AHSP Hal.169/693
170
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.081 98,019
- Tukang pasang pipa Oh 0.135 98,019
- Kepala tukang Oh 0.014 132,928
- Mandor Oh 0.004 150,382
Upah tenaga:
- Pekerja Oh 0.081 98,019
- Tukang pasang pipa Oh 0.135 98,019
- Kepala tukang Oh 0.014 132,928
- Mandor Oh 0.004 150,382
Upah tenaga:
- Pekerja Oh 0.081 98,019
- Tukang pasang pipa Oh 0.135 98,019
- Kepala tukang Oh 0.014 132,928
- Mandor Oh 0.004 150,382
Upah tenaga:
- Pekerja Oh 0.081 98,019
- Tukang pasang pipa Oh 0.135 98,019
2-AHSP Hal.170/693
171
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.081 98,019
- Tukang pasang pipa Oh 0.135 98,019
- Kepala tukang Oh 0.014 132,928
- Mandor Oh 0.004 150,382
2-AHSP Hal.171/693
172
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.081 98,019
- Tukang pasang pipa Oh 0.135 98,019
- Kepala tukang Oh 0.014 132,928
- Mandor Oh 0.004 150,382
Upah tenaga:
- Pekerja Oh 0.030 98,019
- Tukang batu Oh 0.300 115,457
- Kepala tukang Oh 0.030 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang pasang pipa Oh 0.100 98,019
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang pasang pipa Oh 0.100 98,019
2-AHSP Hal.172/693
173
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang pasang pipa Oh 0.100 98,019
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.173/693
174
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang pasang pipa Oh 0.100 98,019
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang pasang pipa Oh 0.100 98,019
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang pasang pipa Oh 0.100 98,019
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang batu Oh 0.100 115,457
2-AHSP Hal.174/693
175
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.175/693
176
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.176/693
177
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.177/693
178
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
53. Membuat 1 unit sumur air tanah bor manual dalam 12 m' + pompa air listrik
Harga bahan:
- Pipa PVC dia 3/4" AW m' 14.000 7,604
- Pipa PVC dia 2" D m' 12.000 11,626
- Pompa air listrik 250 W unit 1.000 3,858,750
- Perlengkapan (35% harga pipa+pompa) % 35.000 4,104,718
Upah tenaga:
- Pekerja Oh 3.162 98,019
- Tukang pasang pipa Oh 2.320 98,019
- Kepala tukang Oh 0.232 132,928
- Mandor Oh 0.158 150,382
Err:508
Err:508
54. Membuat 1 unit tanki septik sederhana kapasitas 1,2 m dalam 1,2 m
Harga bahan:
- Bata merah bh 441.000 508
- Semen portland kg 126.170 1,264
- Pasir pasang m 0.439 249,780
- Batu pecah/split 2/3 m 0.130 249,560
- Besi beton polos kg 11.440 9,584
- Kawat beton kg 0.164 18,022
- Pasir beton m 0.093 248,770
- Pasir urug m 0.106 248,706
- Kayu Terentang balok m 0.007 3,016,667
- Triplek 4x8 ft 9 mm lbr 0.675 118,480
- Paku biasa 2"-5" kg 0.710 16,436
- Pipa PVC dia 2" D m' 1.000 11,626
- Pipa PVC dia 4" D m' 1.700 32,174
- Perlengkapan (35% harga pipa) % 35.000 66,322
Upah tenaga:
- Pekerja Oh 5.440 98,019
- Tukang batu Oh 2.181 115,457
- Tukang pasang pipa Oh 0.320 98,019
- Kepala tukang Oh 0.250 132,928
- Mandor Oh 0.306 150,382
55. Membuat 1 unit tanki septik kapasitas 1,7x0,85 m dalam 1,3 m (vol. 1,88 m u/ 5 pemakai)
Harga bahan:
- Bata merah bh 722.000 508
- Semen portland kg 304.860 1,264
- Pasir pasang m 0.589 249,780
- Batu pecah/split 2/3 m 0.200 249,560
2-AHSP Hal.178/693
179
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 8.648 98,019
- Tukang batu Oh 3.486 115,457
- Tukang pasang pipa Oh 0.500 98,019
- Kepala tukang Oh 0.399 132,928
- Mandor Oh 0.482 150,382
2-AHSP Hal.179/693
180
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 4.604 98,019
- Tukang batu Oh 1.856 115,457
- Tukang pasang pipa Oh 0.267 98,019
- Kepala tukang Oh 0.213 132,928
- Mandor Oh 0.257 150,382
57. Membuat 1 unit resapan 0,8 m (digali 1 m) dalam 1 m (digali 1,9 m) kap. 0,5 m
Harga bahan:
- Batu pecah/split 3/5 m 0.603 238,167
- Ijuk kg 0.716 8,270
- Pipa PVC dia 4" D m' 2.000 32,174
Upah tenaga:
- Pekerja Oh 1.050 98,019
- Tukang pasang pipa Oh 0.270 98,019
- Kepala tukang Oh 0.027 132,928
- Mandor Oh 0.097 150,382
Upah tenaga:
2-AHSP Hal.180/693
181
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.200 98,019
- Mandor Oh 0.550 150,382
2-AHSP Hal.181/693
182
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.060 98,019
- Tukang las Oh 0.060 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.060 98,019
- Tukang las Oh 0.060 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
Upah buat:
- Pekerja Oh 0.020 98,019
- Tukang besi konstruksi Oh 0.020 115,441
- Mandor Oh 0.007 150,382
Upah erection:
- Transport kg 1.000 1,726
- Pekerja Oh 0.010 98,019
- Tukang besi konstruksi Oh 0.005 115,441
- Mandor Oh 0.002 150,382
2-AHSP Hal.182/693
183
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.183/693
184
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah buat:
- Pekerja Oh 0.020 98,019
- Tukang besi konstruksi Oh 0.020 115,441
- Mandor Oh 0.007 150,382
Upah erection:
- Transport kg 1.000 1,798
- Pekerja Oh 0.010 98,019
- Tukang besi konstruksi Oh 0.005 115,441
- Mandor Oh 0.002 150,382
Upah buat:
- Pekerja Oh 0.020 98,019
- Tukang besi konstruksi Oh 0.020 115,441
- Mandor Oh 0.007 150,382
Upah erection:
- Transport kg 1.000 2,128
- Pekerja Oh 0.010 98,019
- Tukang besi konstruksi Oh 0.005 115,441
- Mandor Oh 0.002 150,382
2-AHSP Hal.184/693
185
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.004 98,019
- Tukang las Oh 0.002 115,457
- Kepala tukang Oh 0.000 132,928
- Mandor Oh 0.000 150,382
2-AHSP Hal.185/693
186
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
4. Pasang pintu besi plat baja tebal 2 mm rangkap, rangka baja siku / tiap m
Harga bahan:
- Besi siku kg 15.000 11,449
- Besi plat baja kg 32.800 13,590
- Kawat Las Listrik kg 0.050 24,883
Upah tenaga:
- Pekerja Oh 1.050 98,019
- Tukang besi Oh 1.050 115,441
- Kepala tukang Oh 0.105 132,928
- Mandor Oh 0.052 150,382
Upah tenaga:
- Pekerja Oh 0.650 98,019
- Tukang besi Oh 0.650 115,441
- Kepala tukang Oh 0.065 132,928
- Mandor Oh 0.032 150,382
Upah tenaga:
- Pekerja Oh 0.440 98,019
- Tukang besi Oh 0.440 115,441
- Kepala tukang Oh 0.044 132,928
- Mandor Oh 0.022 150,382
2-AHSP Hal.186/693
187
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.200 98,019
- Tukang besi Oh 1.200 115,441
- Kepala tukang Oh 0.120 132,928
- Mandor Oh 0.006 150,382
2-AHSP Hal.187/693
188
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.043 98,019
- Tukang besi konstruksi Oh 0.043 115,441
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.043 98,019
- Tukang besi konstruksi Oh 0.043 115,441
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.002 150,382
Upah tenaga:
- Pekerja Oh 0.085 98,019
- Tukang kayu Oh 0.085 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.004 150,382
2-AHSP Hal.188/693
189
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.085 98,019
- Tukang kayu Oh 0.085 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.004 150,382
2-AHSP Hal.189/693
190
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.670 98,019
- Tukang las Oh 1.670 115,457
- Kepala tukang Oh 0.167 132,928
- Mandor Oh 0.083 150,382
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.001 150,382
14. Pasang talang datar, seng BJLS 28 (0,28 mm) tiap 1 m'
Harga bahan:
- Seng plat 3x6 ft BJLS 28 (0,28 mm) Lbr 0.500 60,940
- Paku biasa 1/2"- 1" kg 0.015 20,935
- Kayu Kamper Medan/Kruing papan m 0.019 9,057,500
- Cat meni besi kg 0.250 27,885
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang kayu Oh 0.400 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.010 150,382
15. Pasang talang miring, seng BJLS 28 (0,28 mm) tiap 1 m'
Harga bahan:
- Seng plat 3x6 ft BJLS 28 (0,28 mm) Lbr 0.500 60,940
- Paku biasa 1/2"- 1" kg 0.015 20,935
2-AHSP Hal.190/693
191
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.040 98,019
- Tukang kayu Oh 0.400 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.191/693
192
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
16. Pasang talang 1/2 lingkaran D-15 cm, seng BJLS 30 / tiap 1 m'
Harga bahan:
- Seng plat 3x6 ft BJLS 28 (0,28 mm) Lbr 0.500 60,940
- Paku biasa 1/2"- 1" kg 0.010 20,935
- Besi pelat strip kg 0.500 11,306
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang kayu Oh 0.300 115,457
- Kepala tukang Oh 0.030 132,928
- Mandor Oh 0.007 150,382
Upah tenaga:
- Pekerja Oh 0.004 98,019
- Tukang kayu Oh 0.038 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.000 150,382
Upah tenaga:
- Pekerja Oh 0.004 98,019
- Tukang kayu Oh 0.038 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.000 150,382
Upah tenaga:
- Pekerja Oh 0.008 98,019
- Tukang kayu Oh 0.075 115,457
- Kepala tukang Oh 0.008 132,928
2-AHSP Hal.192/693
193
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.193/693
194
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.060 98,019
- Tukang kayu Oh 0.600 115,457
- Kepala tukang Oh 0.060 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang kayu Oh 0.500 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang kayu Oh 0.500 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.005 98,019
- Tukang kayu Oh 0.500 115,457
- Kepala tukang Oh 0.005 132,928
- Mandor Oh 0.000 150,382
2-AHSP Hal.194/693
195
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.005 98,019
- Tukang kayu Oh 0.500 115,457
- Kepala tukang Oh 0.005 132,928
- Mandor Oh 0.000 150,382
2-AHSP Hal.195/693
196
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.025 98,019
- Tukang kayu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.025 98,019
- Tukang kayu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.196/693
197
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.197/693
198
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.050 98,019
- Tukang kayu Oh 0.500 115,457
- Kepala tukang Oh 0.050 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.198/693
199
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.199/693
200
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.050 98,019
- Tukang kayu Oh 0.500 115,457
- Kepala tukang Oh 0.050 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang kayu Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.200/693
201
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.201/693
202
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.050 98,019
- Tukang kayu Oh 0.500 115,457
- Kepala tukang Oh 0.050 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.010 98,019
- Tukang kayu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.060 98,019
- Tukang kayu Oh 0.600 115,457
- Kepala tukang Oh 0.060 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.202/693
203
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.203/693
204
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.017 98,019
- Tukang kayu Oh 0.165 115,457
- Kepala tukang Oh 0.017 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.017 98,019
- Tukang kayu Oh 0.165 115,457
- Kepala tukang Oh 0.017 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.204/693
205
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.205/693
206
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.206/693
207
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.207/693
208
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.015 98,019
- Tukang kayu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Tukang batu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.013 150,382
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Tukang batu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.013 150,382
2-AHSP Hal.208/693
209
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Tukang batu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.013 150,382
2-AHSP Hal.209/693
210
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.260 98,019
- Tukang batu Oh 0.125 115,457
- Kepala tukang Oh 0.013 132,928
- Mandor Oh 0.013 150,382
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.210/693
211
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.211/693
212
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.212/693
213
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.213/693
214
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
Upah tenaga:
- Pekerja Oh 0.650 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.033 150,382
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Tukang batu Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.120 98,019
2-AHSP Hal.214/693
215
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.720 98,019
- Tukang batu Oh 0.650 115,457
- Kepala tukang Oh 0.065 132,928
- Mandor Oh 0.035 150,382
2-AHSP Hal.215/693
216
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang batu Oh 0.450 115,457
- Kepala tukang Oh 0.045 132,928
- Mandor Oh 0.030 150,382
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang batu Oh 0.450 115,457
- Kepala tukang Oh 0.045 132,928
- Mandor Oh 0.030 150,382
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang batu Oh 0.450 115,457
- Kepala tukang Oh 0.045 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.216/693
217
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang batu Oh 0.450 115,457
- Kepala tukang Oh 0.045 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.217/693
218
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.300 150,382
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
Upah tenaga:
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.218/693
219
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.219/693
220
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.220/693
221
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga: 0
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.221/693
222
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga: 0
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.222/693
223
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Harga bahan:
- Ubin keramik 5 x 20 cm Roman bh 5.300 880
- Semen portland kg 0.570 1,264
- Pasir pasang m 0.002 249,780
- Semen warna kg 0.013 12,430
Upah tenaga: 0
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.223/693
224
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga: 0
- Pekerja Oh 0.090 98,019
- Tukang batu Oh 0.090 115,457
- Kepala tukang Oh 0.009 132,928
- Mandor Oh 0.005 150,382
Upah tenaga:
- Pekerja Oh 0.050 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.080 98,019
- Tukang batu Oh 0.080 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.004 150,382
2-AHSP Hal.224/693
225
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.120 98,019
- Tukang kayu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.006 150,382
2-AHSP Hal.225/693
226
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
P PEKERJAAN PENGECATAN
1. Mengikis/mengerok permukaan tembok lama tiap 1 m
Upah tenaga:
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.040 98,019
- Tukang cat Oh 0.040 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang cat Oh 0.075 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.226/693
227
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang cat Oh 0.075 115,457
- Kepala tukang Oh 0.008 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.227/693
228
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang cat Oh 0.090 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
6. Pengecatan bidang kayu baru dg plamir 1 m + 1 lps dsr + 2 lps penutup Mowilex
Harga bahan:
- Cat meni kayu kg 0.200 27,185
- Plamir kayu kg 0.150 22,585
- Cat kayu/besi Mowilex (cat dasar) kg 0.170 38,131
- Cat kayu/besi Mowilex (cat penutup) kg 0.260 40,155
- Amplas lbr 0.500 3,420
- Minyak cat/ thinner ltr 0.200 20,120
- kuas bh 0.050 7,861
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang cat Oh 0.090 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
2-AHSP Hal.228/693
229
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.229/693
230
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
8. Pengecatan bidang kayu baru dg plamir 1 m + 1 lps dsr + 3 lps penutup Mowilex
Harga bahan:
- Cat meni kayu kg 0.200 27,185
- Plamir kayu kg 0.150 22,585
- Cat kayu/besi Mowilex (cat dasar) kg 0.170 38,131
- Cat kayu/besi Mowilex (cat penutup) kg 0.350 40,155
- Amplas lbr 0.500 3,420
- Minyak cat/ thinner ltr 0.300 20,120
- kuas bh 0.050 7,861
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang cat Oh 0.105 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Tukang cat Oh 0.060 115,457
- Kepala tukang Oh 0.016 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Tukang cat Oh 0.280 115,457
- Kepala tukang Oh 0.040 132,928
- Mandor Oh 0.020 150,382
2-AHSP Hal.230/693
231
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Tukang cat Melamic Oh 0.600 115,457
- Kepala tukang cat Melamic Oh 0.060 132,928
2-AHSP Hal.231/693
232
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Tukang cat Melamic Oh 0.300 115,457
- Kepala tukang cat Melamic Oh 0.030 132,928
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Mandor Oh 0.006 150,382
Upah tenaga:
- Pekerja Oh 0.160 98,019
- Tukang cat Oh 0.160 115,457
- Kepala tukang Oh 0.016 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.232/693
233
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang cat Oh 0.063 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.233/693
234
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang cat Oh 0.063 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
17. Pengecatan tembok baru dg wall sealer 1 m + 1 lps dsr + 2 lps Dulux/ICI
Harga bahan:
- Wall sealer Dulux/ICI kg 0.100 36,102
- Cat tembok Dulux/ICI (cat dasar) kg 0.100 38,131
- Cat tembok Dulux/ICI (cat penutup) kg 0.260 40,155
- Amplas lbr 0.300 3,420
- kuas roll bh 0.015 16,543
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang cat Oh 0.063 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
18. Pengecatan tembok baru dg wall sealer 1 m + 1 lps dsr + 2 lps Dulux/ICI Weathershield
Harga bahan:
- Wall sealer Dulux/ICI kg 0.100 36,102
- Cat tembok Dulux/ICI Weathershield kg 0.360 74,260
- Amplas lbr 0.300 3,420
- kuas roll bh 0.015 16,543
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang cat Oh 0.063 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.234/693
235
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.028 98,019
- Tukang cat Oh 0.042 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.235/693
236
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
20. Pengecatan bidang tembok lama 1 m dg 1 lps dsr + 2 lps penutup Catylac
Harga bahan:
- Cat tembok Catylac (cat dasar) kg 0.120 16,430
- Cat tembok Catylac (cat penutup) kg 0.180 16,430
- Amplas lbr 0.300 3,420
- kuas roll bh 0.015 16,543
Upah tenaga:
- Pekerja Oh 0.028 98,019
- Tukang cat Oh 0.042 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.003 150,382
21. Pengecatan bidang tembok lama 1 m dg 1 lps dsr + 2 lps penutup Dulux/ICI
Harga bahan:
- Cat tembok Dulux/ICI (cat dasar) kg 0.120 38,131
- Cat tembok Dulux/ICI (cat penutup) kg 0.180 40,155
- Amplas lbr 0.300 3,420
- kuas roll bh 0.015 16,543
Upah tenaga:
- Pekerja Oh 0.028 98,019
- Tukang cat Oh 0.042 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.028 98,019
- Tukang cat Oh 0.042 115,457
- Kepala tukang Oh 0.004 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.236/693
237
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang cat Oh 0.063 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.237/693
238
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang cat Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Tukang cat Oh 0.225 115,457
- Kepala tukang Oh 0.023 132,928
- Mandor Oh 0.008 150,382
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang cat Oh 0.090 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.238/693
239
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang cat Oh 0.090 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.239/693
240
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.070 98,019
- Tukang cat Oh 0.090 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
Upah tenaga:
- Pekerja Oh 0.350 98,019
- Tukang cat Oh 0.400 115,457
- Kepala tukang Oh 0.100 132,928
- Mandor Oh 0.035 150,382
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang cat Oh 0.063 115,457
- Kepala tukang Oh 0.006 132,928
- Mandor Oh 0.003 150,382
2-AHSP Hal.240/693
241
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.020 98,019
- Tukang cat Oh 0.200 115,457
- Kepala tukang Oh 0.020 132,928
- Mandor Oh 0.001 150,382
2-AHSP Hal.241/693
242
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
32 Grouting
Harga bahan:
- Grout kg 15.000 3,200
- alat bantu % 10.000 48,000
Upah tenaga:
- Pekerja Oh 0.200 98,019
- Tukang cat Oh 0.150 115,457
- Kepala tukang Oh 0.015 132,928
- Mandor Oh 0.010 150,382
Upah tenaga:
- Pekerja Oh 0.120 98,019
- Tukang batu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.006 150,382
Upah tenaga:
- pekerja org/hr 0.200 98,019
- tukang cat org/hr 0.200 115,457
- kepala tukang org/hr 0.020 132,928
- mandor org/hr 0.010 150,382
Upah tenaga:
- pekerja org/hr 0.060 98,019
- tukang cat org/hr 0.075 115,457
2-AHSP Hal.242/693
243
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
pekerja org/hr 0.020 98,019
tukang cat org/hr 0.200 115,457
kepala tukang org/hr 0.020 132,928
mandor org/hr 0.010 150,382
2-AHSP Hal.243/693
244
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Q PEKERJAAN BONGKARAN
1. Bongkar beton bertulang tiap 1m
Upah tenaga:
- Pekerja Oh 6.667 98,019
- Mandor Oh 0.333 150,382
2-AHSP Hal.244/693
245
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.245/693
246
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
13. Bongkar kaso dan reng kayu (kayu akan dipakai lagi) tiap 1 m
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Tukang kayu Oh 0.025 115,457
- Kepala tukang Oh 0.003 132,928
- Mandor Oh 0.005 150,382
14. Bongkar kaso dan reng kayu (kayu tidak akan dipakai lagi) tiap 1 m
Upah tenaga:
- Pekerja Oh 0.100 98,019
- Mandor Oh 0.005 150,382
15. Bongkar balok kuda-kuda & loteng (kayu akan dipakai lagi) tiap 1 m
Upah tenaga:
- Pekerja Oh 2.666 98,019
- Tukang kayu Oh 4.000 115,457
- Kepala tukang Oh 0.400 132,928
- Mandor Oh 0.133 150,382
2-AHSP Hal.246/693
247
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
16. Bongkar balok kuda-kuda & loteng (kayu tidak akan dipakai lagi) tiap 1 m
Upah tenaga:
- Tukang kayu Oh 4.000 115,457
- Kepala tukang Oh 0.400 132,928
2-AHSP Hal.247/693
248
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
Err:508
Err:508
Err:508
2. Pasang instalasi lampu dg NYM 2x2,5 mm tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Catatan: Tdk termasuk fitting lampu, sakelar & lampu. Asumsi tinggi plafond 4 m', bentang ruang 8 m', uk. Kabel standar PUIL 2000
Harga bahan:
- Kabel NYM 2x2,5 mm m' 10.000 7,530
- Conduit pipa PVC dia " C m' 10.000 9,840
- Tee dos bh 1.000 2,800
- Inbow doos bh 1.000 2,510
- Sock bh 3.000 2,260
- Klem conduit bh 9.000 1,730
- Lastdop bh 3.000 2,490
- Flexible pipe m' 1.000 3,095
- Elbow bh 2.000 3,166
- Paku, sekrup, fisher (10% harga conduit) % 10.000 98,400
Upah tenaga:
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
Err:508
Err:508
Err:508
3. Pasang instalasi lampu dg NYM 2x1,5 mm tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Catatan: Fitting lampu, sakelar & lampu tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Analisis dibuat untuk rumah & gedung sederhana, kabel yang dipakai NYM 2x1,5 mm.
2-AHSP Hal.248/693
249
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Harga bahan:
- Kabel NYM 2x1,5 mm m' 10.000 6,310
- Conduit pipa PVC dia " C m' 10.000 9,840
- Tee dos bh 1.000 2,800
- Inbow doos bh 1.000 2,510
- Sock bh 3.000 2,260
- Klem conduit bh 9.000 1,730
- Lastdop bh 3.000 2,490
- Flexible pipe m' 1.000 3,095
- Elbow bh 2.000 3,166
- Paku, sekrup, fisher (10% harga conduit) % 10.000 98,400
Upah tenaga:
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
Err:508
Err:508
Err:508
2-AHSP Hal.249/693
250
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
4. Pasang instalasi lampu untuk gedung pertemuan & gudang tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Catatan: Fitting lampu, sakelar & lampu tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Asumsi tinggi plafon 4-10 m', analisis tersebut dipakai untuk ruangan seperti gudang, gedung pertemuan, aula, rumah ibadat, beng
Harga bahan:
- Kabel NYM 3x2,5 mm m' 10.000 11,202
- Conduit pipa PVC dia " C m' 10.000 9,840
- Tee dos bh 1.000 2,800
- Inbow doos bh 1.000 2,510
- Sock bh 6.000 2,260
- Klem conduit bh 18.000 1,730
- Lastdop bh 3.000 2,490
- Flexible pipe m' 1.000 3,095
- Elbow bh 2.000 3,166
- Paku, sekrup, fisher (10% harga conduit) % 10.000 98,400
Upah tenaga:
- Instalator Oh 0.600 132,928
- Pekerja Oh 0.300 98,019
- Mandor Oh 0.030 150,382
Err:508
Err:508
Err:508
5. Pasang instalasi lampu Penerangan Luar / Halaman tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Harga bahan:
- Kabel NYFGbY 3 X 4 mm m' 15.000 38,280
- Conduit m' 4.000 9,840
- Galian kabel bh 0.900 33,170
- Urugan pasir bh 0.300 196,780
- Urugan tanah kembali bh 0.450 11,050
- Bata press pelindung kabel bh 150.000 508
Upah tenaga:
- Instalator Oh 0.800 132,928
- Pekerja Oh 0.400 98,019
- Mandor Oh 0.040 150,382
Err:508
Err:508
Err:508
Upah tenaga:
- Instalator Oh 0.100 132,928
- Mandor Oh 0.010 150,382
Err:508
2-AHSP Hal.250/693
251
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Err:508
Err:508
6 Pasang kabel feeder NYY 4x4 mm tiap 1 m
Harga bahan:
- Kabel NYY 4x4 mm m' 1.000 39,473
Upah tenaga:
- Instalator Oh 0.100 132,928
- Mandor Oh 0.010 150,382
Err:508
Err:508
Err:508
2-AHSP Hal.251/693
252
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.300 132,928
- Mandor Oh 0.030 150,382
Err:508
Err:508
Err:508
8 Pasang instalasi AC dg NYY 4x10 mm tiap 1 titik
Harga bahan:
- Kabel NYY 4x10 mm m' 10.000 120,722
- Lastdop bh 3.000 2,490
Upah tenaga:
- Instalator Oh 0.300 132,928
- Mandor Oh 0.030 150,382
Err:508
Err:508
Err:508
9 Pasang instalasi AC dg NYY 3x2,5 mm tiap 1 titik
Harga bahan:
- Kabel NYY 3x2,5 mm m' 10.000 11,202
- Lastdop bh 3.000 2,490
Upah tenaga:
- Instalator Oh 0.300 132,928
- Mandor Oh 0.030 150,382
Err:508
Err:508
Err:508
10. Pasang instalasi stop kontak tiap 1 titik (tidak termasuk stop kontak)
Catatan: Stop kontak tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Harga bahan:
- Kabel NYM 3x2,5 mm m' 10.000 11,202
- Conduit pipa PVC dia " C m' 10.000 9,840
- Tee dos bh 1.000 2,800
- Inbow doos bh 1.000 2,510
- Sock bh 3.000 2,260
- Klem conduit bh 9.000 1,730
- Lastdop bh 3.000 2,490
- Elbow bh 2.000 3,095
- Paku, sekrup, fisher (10% harga conduit) % 10.000 98,400
Upah tenaga:
2-AHSP Hal.252/693
253
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.253/693
254
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
11. Pasang instalasi stop kontak lebih dari 500 watt tiap 1 titik (tidak termasuk stop kontak)
Catatan: Stop kontak tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Harga bahan:
- Kabel NYM 3x4 mm m' 12.000 21,012
- Conduit pipa PVC dia " C m' 12.000 9,840
- Outlet Box Metal bh 1.000 2,800
- Tee dos bh 1.000 2,510
- Inbow doos bh 1.000 2,260
- Sock bh 9.000 1,730
- Klem conduit bh 20.000 2,490
- Lastdop bh 3.000 3,095
- Elbow bh 4.000 98,400
- Paku, sekrup, fisher (10% harga conduit) % 10.000 118,080
Upah tenaga:
- Instalator Oh 0.500 132,928
- Pekerja Oh 0.250 98,019
- Mandor Oh 0.025 150,382
Err:508
Err:508
Err:508
12. Pasang instalasi listrik + outlet AC tiap 1 titik (tidak termasuk AC)
Catatan: Unit AC tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Harga bahan:
- Kabel NYM 3x2,5 mm m' 10.000 11,202
- Conduit pipa PVC dia " C m' 10.000 9,840
- Kotak kontak khusus (KKK) bh 1.000 88,200
- Tee dos bh 1.000 2,800
- Inbow doos bh 1.000 2,510
- Sock bh 3.000 2,260
- Klem conduit bh 9.000 1,730
- Lastdop bh 3.000 2,490
- Elbow bh 2.000 3,095
- Paku, sekrup, fisher (10% harga conduit) % 10.000 98,400
Upah tenaga:
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
Err:508
Err:508
Err:508
Catatan :
Analisis Pasang Instalasi Lampu dgn NYM 3x2,5 mm2 dan Pasang Instalasi Stop Kontak diatas 500 W , tertulis di
V Pekerjaan Analisa Tambahan Halaman 80.
2-AHSP Hal.254/693
255
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
13. Pasang instalasi + tiang antena TV tiap 1 titik (tidak termasuk socket & antena)
Catatan: Socket & antena tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Harga bahan:
- Kabel antena TV m' 20.000 6,080
- Conduit pipa PVC dia " C m' 20.000 9,840
- Inbow doos bh 1.000 2,510
- Sock bh 5.000 2,260
- Klem conduit bh 14.000 1,730
- Klem pipa besi 3/4" bh 2.000 2,430
- Pipa galvanis dia 3/4" m' 2.000 26,180
- Paku, sekrup, fisher (10% harga conduit) % 10.000 196,800
Upah tenaga:
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
Err:508
Err:508
Err:508
2-AHSP Hal.255/693
256
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
Err:508
Err:508
Err:508
15. Pasang instalasi telepon tiap 1 titik (tidak termasuk outlet, pesawat telepon & sambungan Telkom)
Catatan: Outlet & pesawat telepon tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Harga bahan:
- Kabel telepon m' 20.000 2,440
- Conduit pipa PVC dia " C m' 20.000 9,840
- Inbow doos bh 1.000 2,510
- Sock bh 5.000 2,260
- Klem conduit bh 14.000 1,730
- Elbow bh 2.000 3,095
- Paku, sekrup, fisher (10% harga conduit) % 10.000 196,800
Upah tenaga:
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
Err:508
Err:508
Err:508
16. Pasang instalasi telepon paralel/extension line tiap 1 titik (tidak termasuk outlet, pesawat telepon)
Catatan: Outlet & pesawat telepon tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Harga bahan:
- Kabel telepon m' 12.000 2,440
- Conduit pipa PVC dia " C m' 12.000 9,840
- Inbow doos bh 1.000 2,510
- Sock bh 3.000 2,260
- Klem conduit bh 9.000 1,730
- Elbow bh 2.000 3,095
- Paku, sekrup, fisher (10% harga conduit) % 10.000 118,080
2-AHSP Hal.256/693
257
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
Err:508
Err:508
Err:508
2-AHSP Hal.257/693
258
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.800 132,928
- Pekerja Oh 0.400 98,019
- Mandor Oh 0.040 150,382
Err:508
Err:508
Err:508
18. Pasang Panel Pembagi Daya 2200 VA / 10 A (3 grup @ 10 A) tiap 1 unit
Catatan: Belum termasuk penyambungan daya listrik PLN
Harga bahan:
- Kabel NYM 3x4 mm m' 10.000 21,012
- Kabel NYM 3x2,5 mm m' 30.000 11,202
- Conduit pipa PVC dia " C m' 40.000 9,840
- MCB box isi 4 bh 1.000 31,420
- MCB 10 A bh 4.000 146,195
- Tee dos bh 4.000 2,800
- Sock bh 10.000 2,260
- Klem conduit bh 27.000 1,730
- Lastdop bh 12.000 2,490
- Elbow bh 2.000 3,166
- Paku, sekrup, fisher (10% harga conduit) % 10.000 393,600
Upah tenaga:
- Instalator Oh 0.800 132,928
- Pekerja Oh 0.400 98,019
- Mandor Oh 0.040 150,382
Err:508
Err:508
Err:508
19. Pasang pentanahan (grounding) tiap 1 titik
Harga bahan:
- Kabel BC 10 mm m' 5.000 17,830
2-AHSP Hal.258/693
259
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.200 132,928
- Pekerja Oh 0.100 98,019
- Mandor Oh 0.010 150,382
Err:508
Err:508
Err:508
2-AHSP Hal.259/693
260
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.200 132,928
- Pekerja Oh 0.100 98,019
- Mandor Oh 0.010 150,382
Err:508
Err:508
Err:508
21. Pasang 1 buah lampu SL
Harga bahan:
- Lampu SL 20 watt bh 1.000 51,830
- Accecories ( 1 % alat ) % 1.000 51,830
Upah tenaga:
- Instalator Oh 0.100 132,928
- Pekerja Oh 0.050 98,019
Err:508
Err:508
Err:508
22. Pasang 1 buah lampu down light PLC 18 watt
Harga bahan:
- Lampu down light PLC 18 watt bh 1.000 199,555
- Accecories ( 1 % alat ) % 1.000 199,555
Upah tenaga:
- Instalator Oh 0.100 132,928
- Pekerja Oh 0.050 98,019
Err:508
Err:508
Err:508
23. Pasang 1 buah lampu roset 18 watt
Harga bahan:
- Lampu roset 18 watt bh 1.000 146,630
- Accecories ( 1 % alat ) % 1.000 146,630
Upah tenaga:
- Instalator Oh 0.100 132,928
- Pekerja Oh 0.050 98,019
Err:508
Err:508
2-AHSP Hal.260/693
261
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Err:508
24 Pasang 1 buah lampu KDK 400 watt
Harga bahan:
- Lampu KDK 400 watt bh 1.000 501,640
- Accecories ( 1 % alat ) % 1.000 501,640
Upah tenaga:
- Instalator Oh 0.100 132,928
- Pekerja Oh 0.050 98,019
Err:508
Err:508
Err:508
2-AHSP Hal.261/693
262
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.100 132,928
- Pekerja Oh 0.050 98,019
Err:508
Err:508
Err:508
26 Pasang 1 buah lampuTKI 2x36 W mirror reflektor + battery nicad
Harga bahan:
- Lampu TL TKI 2x36W Miror Reflector with Battery Nicad bh 1.000 1,399,030
- Accecories ( 1 % alat ) % 1.000 1,399,030
Upah tenaga:
- Instalator Oh 0.100 132,928
- Pekerja Oh 0.050 98,019
Err:508
Err:508
Err:508
27 Pasang 1 buah lampu PLC 18 W + battery nicad
Harga bahan:
- Lampu Downlight PLC 18 Watt with battery Nicad bh 1.000 978,900
- Accecories ( 1 % alat ) % 1.000 978,900
Upah tenaga:
- Instalator Oh 0.100 132,928
- Pekerja Oh 0.050 98,019
Err:508
Err:508
Err:508
28. Pasang 1 buah lampu TL 1x18 RM
Harga bahan:
- Lampu TL 1x18 watt RM bh 1.000 200,380
- Accecories ( 1 % alat ) % 1.000 200,380
Upah tenaga:
- Instalator Oh 0.120 132,928
- Pekerja Oh 0.060 98,019
Err:508
Err:508
Err:508
29. Pasang 1 buah lampu TL 2x18 RM
Harga bahan:
- Lampu TL 2x18 watt RM bh 1.000 396,360
2-AHSP Hal.262/693
263
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.120 132,928
- Pekerja Oh 0.060 98,019
Err:508
Err:508
Err:508
30. Pasang 1 buah lampu TL 2x36 RM
Harga bahan:
- Lampu TL 2x36 watt RM bh 1.000 625,965
- Accecories ( 1 % alat ) % 1.000 625,965
Upah tenaga:
- Instalator Oh 0.120 132,928
- Pekerja Oh 0.060 98,019
Err:508
Err:508
Err:508
2-AHSP Hal.263/693
264
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.120 132,928
- Pekerja Oh 0.060 98,019
Err:508
Err:508
Err:508
32. Pasang 1 buah lampu TL 2x18 Balk
Harga bahan:
- Lampu TL 2x18 watt Balk bh 1.000 306,450
- Accecories ( 1 % alat ) % 1.000 306,450
Upah tenaga:
- Instalator Oh 0.120 132,928
- Pekerja Oh 0.060 98,019
Err:508
Upah tenaga:
- Instalator Oh 0.120 132,928
- Pekerja Oh 0.060 98,019
Err:508
Err:508
Err:508
34. Pasang 1 buah lampu TL 2x36 Balk
Harga bahan:
- Lampu TL 2x36 watt Balk bh 1.000 344,260
- Accecories ( 1 % alat ) % 1.000 344,260
Upah tenaga:
- Instalator Oh 0.120 132,928
- Pekerja Oh 0.060 98,019
Err:508
Err:508
Err:508
35. Pasang 1 buah lampu baret
Harga bahan:
- Lampu Baret 11 watt bh 1.000 331,330
2-AHSP Hal.264/693
265
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.150 132,928
- Pekerja Oh 0.075 98,019
Err:508
Err:508
Err:508
36. Pasang 1 buah lampu pijar
Harga bahan:
- Lampu pijar 25 watt bh 1.000 34,150
- Accecories ( 1 % alat ) % 1.000 34,150
Upah tenaga:
- Instalator Oh 0.100 132,928
- Pekerja Oh 0.050 98,019
Err:508
Err:508
Err:508
2-AHSP Hal.265/693
266
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.350 132,928
- Pekerja Oh 0.175 98,019
Err:508
Err:508
Err:508
38. Pasang 1 buah saklar tunggal
Harga bahan:
- Saklar tunggal Broco bh 1.000 19,238
- Accecories ( 1 % alat ) % 1.000 19,238
Upah tenaga:
- Instalator Oh 0.350 132,928
- Pekerja Oh 0.175 98,019
Err:508
Err:508
Err:508
39. Pasang 1 buah saklar ganda
Harga bahan:
- Saklar seri Broco bh 1.000 23,986
- Accecories ( 1 % alat ) % 1.000 23,986
Upah tenaga:
- Instalator Oh 0.350 132,928
- Pekerja Oh 0.175 98,019
Err:508
Err:508
Err:508
40. Pasang 1 buah stop kontak
Harga bahan:
- Stop kontak Broco bh 1.000 37,960
- Accecories ( 1 % alat ) % 1.000 37,960
Upah tenaga:
- Instalator Oh 0.350 132,928
- Pekerja Oh 0.175 98,019
Err:508
Err:508
Err:508
41. Pasang 1 buah Exhaust Fan
Harga bahan:
- Exhaust Fan bh 1.000 386,980
2-AHSP Hal.266/693
267
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.350 132,928
- Pekerja Oh 0.175 98,019
Err:508
Err:508
Err:508
42. Pasang 1 buah out let TV
Harga bahan:
- outlet TV bh 1.000 35,000
- Accecories ( 1 % alat ) % 1.000 35,000
Upah tenaga:
- Instalator Oh 0.350 132,928
- Pekerja Oh 0.175 98,019
Err:508
Err:508
Err:508
2-AHSP Hal.267/693
268
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.140 98,019
- Tukang batu Oh 0.070 115,457
- Kepala tukang Oh 0.007 132,928
- Mandor Oh 0.007 150,382
Upah tenaga:
- Pekerja Oh 0.380 98,019
- Tukang batu Oh 0.190 115,457
- Kepala tukang Oh 0.019 132,928
- Mandor Oh 0.019 150,382
Upah tenaga: 0
- Pekerja Oh 0.380 98,019
- Tukang batu Oh 0.190 115,457
- Kepala tukang Oh 0.019 132,928
- Mandor Oh 0.019 150,382
2-AHSP Hal.268/693
269
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga: 0
- Pekerja Oh 0.380 98,019
- Tukang batu Oh 0.190 115,457
- Kepala tukang Oh 0.019 132,928
- Mandor Oh 0.019 150,382
2-AHSP Hal.269/693
270
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga: 0
- Pekerja Oh 0.380 98,019
- Tukang batu Oh 0.190 115,457
- Kepala tukang Oh 0.019 132,928
- Mandor Oh 0.019 150,382
Upah tenaga: 0
- Pekerja Oh 0.380 98,019
- Tukang batu Oh 0.190 115,457
- Kepala tukang Oh 0.019 132,928
- Mandor Oh 0.019 150,382
Upah tenaga: 0
- Pekerja Oh 0.380 98,019
- Tukang batu Oh 0.190 115,457
- Kepala tukang Oh 0.019 132,928
- Mandor Oh 0.019 150,382
2-AHSP Hal.270/693
271
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 3.200 98,019
- Tukang batu Oh 0.015 115,457
- Kepala tukang Oh 0.002 132,928
- Mandor Oh 0.016 150,382
2-AHSP Hal.271/693
272
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.420 98,019
- Tukang batu Oh 0.473 115,457
- Kepala tukang Oh 0.047 132,928
- Mandor Oh 0.071 150,382
Upah tenaga:
- Pekerja Oh 2.160 98,019
- Tukang batu Oh 0.720 115,457
- Kepala tukang Oh 0.072 132,928
- Mandor Oh 0.108 150,382
- Tukang gali Oh 0.100 115,457
11. Membuat saluran air buis beton 20 cm dinding bata dalam 15-25 cm tiap 1 m'
Harga bahan:
- Bata merah bh 42.000 508
- Semen portland kg 14.785 1,264
- Pasir pasang m 0.042 249,780
- Pasir urug m 0.008 248,706
- Buis beton 1/2 dia 20 panj. 100 cm bh 1.100 22,452
Upah tenaga:
- Pekerja Oh 0.460 98,019
- Tukang batu Oh 0.198 115,457
- Kepala tukang Oh 0.020 132,928
2-AHSP Hal.272/693
273
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
12. Membuat saluran air buis beton 30 cm dinding bata dalam 30-45 cm tiap 1 m'
Harga bahan:
- Bata merah bh 77.000 508
- Semen portland kg 23.113 1,264
- Pasir pasang m 0.066 249,780
- Pasir urug m 0.034 248,706
- Buis beton 1/2 dia 30 panj. 100 cm bh 1.100 30,332
Upah tenaga:
- Pekerja Oh 0.771 98,019
- Tukang batu Oh 0.272 115,457
- Kepala tukang Oh 0.028 132,928
- Mandor Oh 0.048 150,382
2-AHSP Hal.273/693
274
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
13. Membuat saluran air dari batu kali lebar bawah 30 cm tinggi 60 cm tiap 1 m'
Harga bahan:
- Batu belah 15/20 m 0.473 245,015
- Semen portland kg 94.420 1,264
- Pasir pasang m 0.227 249,780
Upah tenaga:
- Pekerja Oh 1.241 98,019
- Tukang batu Oh 0.398 115,457
- Kepala tukang Oh 0.040 132,928
- Mandor Oh 0.083 150,382
14. Membuat saluran air dari batu kali lebar bawah 60 cm tinggi 80 cm tiap 1 m'
Harga bahan:
- Batu belah 15/20 m 0.704 245,015
- Semen portland kg 136.840 1,264
- Pasir pasang m 0.329 249,780
Upah tenaga:
- Pekerja Oh 1.925 98,019
- Tukang batu Oh 0.524 115,457
- Kepala tukang Oh 0.052 132,928
- Mandor Oh 0.135 150,382
15. Membuat saluran air dari batu kali lebar bawah 80 cm tinggi 100 cm tiap 1 m'
Harga bahan:
- Batu belah 15/20 m 1.012 245,015
- Semen portland kg 193.400 1,264
- Pasir pasang m 0.464 249,780
Upah tenaga:
- Pekerja Oh 2.983 98,019
- Tukang batu Oh 0.692 115,457
- Kepala tukang Oh 0.069 132,928
2-AHSP Hal.274/693
275
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
16. Membuat saluran air dari batu kali lebar bawah 100 cm tinggi 120 cm tiap 1 m'
Harga bahan:
- Batu belah 15/20 m 1.287 245,015
- Semen portland kg 244.980 1,264
- Pasir pasang m 0.588 249,780
Upah tenaga:
- Pekerja Oh 4.105 98,019
- Tukang batu Oh 0.862 115,457
- Kepala tukang Oh 0.086 132,928
- Mandor Oh 0.309 150,382
2-AHSP Hal.275/693
276
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
17 Memasang pipa beton type RJ ex Boral, dia 80 cm panj. 2440 mm tiap buah
Harga bahan:
- Pipa beton dia 80 panj. 2440 mm bh 1.000 1,400,480
Upah tenaga:
- Pekerja Oh 1.140 98,019
- Tukang batu Oh 0.570 115,457
- Kepala tukang Oh 0.057 132,928
- Mandor Oh 0.057 150,382
18 Memasang pipa beton type RJ ex Boral, dia 100 cm panj. 2440 mm tiap buah
Harga bahan:
- Pipa beton dia 100 panj. 2440 mm bh 1.000 2,759,250
Upah tenaga:
- Pekerja Oh 1.140 98,019
- Tukang batu Oh 0.570 115,457
- Kepala tukang Oh 0.057 132,928
- Mandor Oh 0.057 150,382
19 Memasang pipa beton type RJ ex Boral, dia 120 cm panj. 2440 mm tiap buah
Harga bahan:
- Pipa beton dia 120 panj. 2440 mm bh 1.000 3,536,860
Upah tenaga:
- Pekerja Oh 1.140 98,019
- Tukang batu Oh 0.570 115,457
- Kepala tukang Oh 0.057 132,928
- Mandor Oh 0.057 150,382
20 Memasang pipa beton type RJ ex Boral, dia 150 cm panj. 2440 mm tiap buah
Harga bahan:
- Pipa beton dia 150 panj. 2440 mm bh 1.000 5,511,460
Upah tenaga:
- Pekerja Oh 1.140 98,019
- Tukang batu Oh 0.570 115,457
- Kepala tukang Oh 0.057 132,928
- Mandor Oh 0.057 150,382
2-AHSP Hal.276/693
277
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.500 98,019
- Tukang batu Oh 0.600 115,457
- Kepala tukang Oh 0.060 132,928
- Mandor Oh 0.075 150,382
2-AHSP Hal.277/693
278
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Tukang batu Oh 0.125 98,019
- Pekerja Oh 0.375 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.019 150,382
Upah tenaga:
- Tukang batu Oh 0.125 98,019
- Pekerja Oh 0.375 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.019 150,382
2-AHSP Hal.278/693
279
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Tukang batu Oh 0.125 98,019
- Pekerja Oh 0.375 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.019 150,382
2-AHSP Hal.279/693
280
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
3. Membuat pagar dinding tinggi 2 m bata merah + plesteran + cat tembok tiap 1 m'
Harga bahan:
- Batu belah 15/20 m 0.360 245,015
- Batu pecah/split 2/3 m 0.060 249,560
- Bata merah bh 115.500 508
- Semen portland kg 105.470 1,264
- Pasir urug m 0.028 248,706
- Pasir pasang m 0.265 249,780
- Pasir beton m 0.038 248,770
- Kayu Terentang balok m 0.014 3,016,667
- Paku biasa 2"-5" kg 0.167 16,436
- Minyak Bekisting lt 0.040 2,780
- Besi beton polos kg 14.700 9,584
- Kawat beton kg 0.868 18,022
- Plamir tembok kg 0.400 23,086
- Cat tembok Catylac (cat dasar) kg 0.400 16,430
- Cat tembok Catylac (cat penutup) kg 1.040 16,430
Upah tenaga:
- Pekerja Oh 2.661 98,019
- Tukang kayu Oh 0.186 115,457
- Tukang besi Oh 0.112 115,441
- Tukang batu Oh 1.029 115,457
- Tukang cat Oh 0.252 115,457
- Kepala tukang Oh 0.158 132,928
- Mandor Oh 0.152 150,382
4. Membuat pagar dinding tinggi 3 m bata merah + plesteran + cat tembok tiap 1 m'
Harga bahan:
- Batu belah 15/20 m 0.360 245,015
- Batu pecah/split 2/3 m 0.065 249,560
- Bata merah bh 185.500 508
- Semen portland kg 135.280 1,264
- Pasir urug m 0.028 248,706
- Pasir pasang m 0.343 249,780
- Pasir beton m 0.042 248,770
- Kayu Terentang balok m 0.015 3,016,667
- Paku biasa 2"-5" kg 0.173 16,436
- Minyak Bekisting lt 0.040 2,780
- Besi beton polos kg 16.560 9,584
- Kawat beton kg 1.147 18,022
- Plamir tembok kg 0.600 23,086
2-AHSP Hal.280/693
281
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 3.458 98,019
- Tukang kayu Oh 0.199 115,457
- Tukang besi Oh 0.124 115,441
- Tukang batu Oh 1.442 115,457
- Tukang cat Oh 0.378 115,457
- Kepala tukang Oh 0.215 132,928
- Mandor Oh 0.194 150,382
2-AHSP Hal.281/693
282
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
5. Membuat pagar dinding tinggi 2 m bata hollow ekspos + kolom/ringbalk diplester & dicat tiap 1 m'
Harga bahan:
- Batu belah 15/20 m 0.360 245,015
- Batu pecah/split 2/3 m 0.060 249,560
- Hollow block HB. 10 bh 20.625 2,900
- Semen portland kg 77.460 1,264
- Pasir urug m 0.028 248,706
- Pasir pasang m 0.195 249,780
- Pasir beton m 0.038 248,770
- Kayu Terentang balok m 0.014 3,016,667
- Paku biasa 2"-5" kg 0.167 16,436
- Minyak Bekisting lt 0.040 2,780
- Besi beton polos kg 17.920 9,584
- Kawat beton kg 0.868 18,022
- Plamir tembok kg 0.143 23,086
- Cat tembok Catylac (cat dasar) kg 0.143 16,430
- Cat tembok Catylac (cat penutup) kg 0.371 16,430
Upah tenaga:
- Pekerja Oh 2.096 98,019
- Tukang kayu Oh 0.186 115,457
- Tukang besi Oh 0.112 115,441
- Tukang batu Oh 0.643 115,457
- Tukang cat Oh 0.090 115,457
- Kepala tukang Oh 0.104 132,928
- Mandor Oh 0.120 150,382
6. Membuat pagar dinding tinggi 1,5 m bata hollow ekspos + kolom/ringbalk diplester & dicat tiap 1 m'
Harga bahan:
- Batu belah 15/20 m 0.174 245,015
- Batu pecah/split 2/3 m 0.053 249,560
- Hollow block HB. 10 bh 14.375 2,900
- Semen portland kg 61.270 1,264
- Pasir pasang m 0.143 248,706
- Pasir beton m 0.034 249,780
- Kayu Terentang balok m 0.013 3,016,667
- Paku biasa 2"-5" kg 0.160 16,436
- Minyak Bekisting lt 0.040 2,780
- Besi beton polos kg 14.873 9,584
- Kawat beton kg 0.558 18,022
- Plamir tembok kg 0.134 23,086
- Cat tembok Catylac (cat dasar) kg 0.134 16,430
2-AHSP Hal.282/693
283
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.535 98,019
- Tukang kayu Oh 0.173 115,457
- Tukang besi Oh 0.098 115,441
- Tukang batu Oh 0.490 115,457
- Tukang cat Oh 0.084 115,457
- Kepala tukang Oh 0.085 132,928
- Mandor Oh 0.085 150,382
2-AHSP Hal.283/693
284
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
7. Membuat pagar BRC 1,2 m tinggi jadi 1,5 m (pondasi batu kali + sloof 15/20 + bata 30 cm + plester + cat) tiap 1 m'
Harga bahan:
- Batu belah 15/20 m 0.274 245,015
- Batu pecah/split 2/3 m 0.022 249,560
- Bata merah bh 21.000 508
- Semen portland kg 43.760 1,264
- Pasir urug m 0.025 248,706
- Pasir pasang m 0.120 249,780
- Pasir beton m 0.015 248,770
- Kayu Terentang balok m 0.006 3,016,667
- Paku biasa 2"-5" kg 0.120 16,436
- Minyak Bekisting lt 0.040 2,780
- Besi beton polos kg 4.440 9,584
- Kawat beton kg 0.064 18,022
- Pagar BRC tinggi 1,2 m' m' 1.000 195,610
- Tiang pagar BRC tinggi 1,2 m' bh 0.555 130,245
- Plamir tembok kg 0.115 23,086
- Cat tembok Catylac (cat dasar) kg 0.115 16,430
- Cat tembok Catylac (cat penutup) kg 0.299 16,430
Upah tenaga:
- Pekerja Oh 1.188 98,019
- Tukang kayu Oh 0.104 115,457
- Tukang besi Oh 0.072 115,441
- Tukang batu Oh 0.341 115,457
- Tukang cat Oh 0.072 115,457
- Kepala tukang Oh 0.059 132,928
- Mandor Oh 0.071 150,382
8. Membuat pagar BRC 0,9 m tinggi jadi 1,2 m (pondasi batu kali + sloof 15/20 + bata 30 cm + plester + cat) tiap 1 m'
Harga bahan:
- Batu belah 15/20 m 0.274 245,015
- Batu pecah/split 2/3 m 0.022 249,560
- Bata merah bh 21.000 508
- Semen portland kg 43.760 1,264
- Pasir urug m 0.025 248,706
- Pasir pasang m 0.120 249,780
- Pasir beton m 0.015 248,770
- Kayu Terentang balok m 0.006 3,016,667
- Paku biasa 2"-5" kg 0.120 16,436
- Minyak Bekisting lt 0.040 2,780
- Besi beton polos kg 4.440 9,584
- Kawat beton kg 0.064 18,022
- Pagar BRC tinggi 0,9 m' m' 1.000 151,728
- Tiang pagar BRC tinggi 0,9 m' bh 0.555 91,235
2-AHSP Hal.284/693
285
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.285/693
286
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Asumsi:
Faktor pengembangan bahan Fk 1.200
Jarak lokasi ke pembuangan L 40.000 Km
Jam kerja efektif Tk 7.000 jam
TENAGA
Produksi menentukan: EXCAVATOR Q1 33.615 m/jam
Produksi galian / hari = Tk x Q1 Qt 235.305 m/hari
Kebutuhan tenaga:
- Pekerja P 2.000 orang
2-AHSP Hal.286/693
287
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.009 98,019
- Mandor Oh 0.004 150,382
2-AHSP Hal.287/693
288
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 1.125 98,019
- Mandor Oh 0.031 150,382
Harga bahan:
- Tanah merah m 1.200 177,500
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Mandor Oh 0.025 150,382
2-AHSP Hal.288/693
289
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
2-AHSP Hal.289/693
290
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.025 98,019
- Mandor Oh 0.000 150,382
2-AHSP Hal.290/693
291
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Harga bahan:
- Sirtu m 1.200 237,740
Upah tenaga:
- Pekerja Oh 0.250 98,019
- Mandor Oh 0.025 150,382
2-AHSP Hal.291/693
292
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
6. Lapis Pondasi Bawah (LPB / Subbase Course) Kelas C Sirtu tebal 10 cm tiap 1m
Harga bahan:
- Sirtu m 0.120 237,740
Upah tenaga:
- Pekerja Oh 0.025 98,019
- Mandor Oh 0.003 150,382
2-AHSP Hal.292/693
293
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
7. Lapis Pondasi Jalan Tanpa Penutup Aspal jenis Waterbound Macadam tiap 1m
Harga bahan:
- Batu pecah 5/7 m 0.935 245,015
- Pasir urug m 0.165 248,706
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Mandor Oh 0.034 150,382
2-AHSP Hal.293/693
294
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Harga bahan:
- Batu pecah/split 2/3 m 0.768 249,560
- Pasir urug m 0.432 248,706
Upah tenaga:
- Pekerja Oh 1.000 98,019
- Mandor Oh 0.034 150,382
2-AHSP Hal.294/693
295
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.004 98,019
- Mandor Oh 0.001 150,382
2-AHSP Hal.295/693
296
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.004 98,019
- Mandor Oh 0.001 150,382
Upah tenaga:
- Pekerja Oh 0.002 98,019
- Mandor Oh 0.000 150,382
2-AHSP Hal.296/693
297
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
12. Lapisan Penetrasi (LAPEN) / Lapisan Permukaan (Surface Course) Macadam tebal 5 cm tiap 1m
ASPHALT SPRAYER
Berat jenis bahan aspal Da 1.010 ton/m
Pemakaian aspal / m As 4.800 kg/m
Kapasitas alat V 800.000 Liter
Efisiensi alat Fa 0.830
Waktu siklus (termasuk proses pemanasan) Ts 2.000 Jam
Harga bahan:
- Batu pecah/split 3/5 m 0.040 238,167
- Batu pecah/split 2/3 m 0.022 249,560
- Batu pecah/split 1/2 m 0.011 248,730
- Abu batu m 0.003 231,084
- Aspal Polimer Lokal kg 4.800 8,250
- Minyak tanah Ltr 0.322 8,690
Upah tenaga:
- Pekerja Oh 0.142 98,019
- Tukang aspal Oh 0.004 115,441
- Mandor Oh 0.004 150,382
2-AHSP Hal.297/693
298
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
13. Lapisan Tipis Aspal Beton (LATASTON / HRS-Hot Rolled Sheet) tebal 3 cm tiap 1m
BAHAN
- Agregat kasar = (CA x (D1 x t m3) x Fh1) : D2 (M03) 0.012 m
- Agregat halus = (FA x (D1 x t m3) x Fh1) : D2 (M04) 0.023 m
- Filler = (FF x (D1 x t m3) x Fh1) (M05) 4.797 kg
- Asphalt = (AS x (D1 x t m3) x Fh2) (M06) 5.299 kg
2-AHSP Hal.298/693
299
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
ASPHALT FINISHER
Kapasitas produksi alat V 40.000 Ton/jam
Efisiensi alat Fa 0.830
2-AHSP Hal.299/693
300
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
TENAGA
Produksi menentukan: AMP Q2 617.560 m/jam
Produksi HRS / hari = Tk x Q2 Qt 4,322.917 m/hari
Kebutuhan tenaga:
- Pekerja P 10.000 orang
- Mandor M 1.000 orang
Koefisien tenaga / m
- Pekerja = P : Qt 0.002 Oh
- Mandor = M : Qt 0.000 Oh
Harga bahan:
- Batu pecah/split 1/2 m 0.012 248,730
- Abu batu m 0.023 231,084
- Filler untuk hotmix (semen) kg 4.798 2,260
- Aspal Polimer Lokal kg 5.299 8,250
Upah tenaga:
- Pekerja Oh 0.002 98,019
- Mandor Oh 0.000 150,382
2-AHSP Hal.300/693
301
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
14. Lapisan Permukaan Aspal Beton (LASTON / AC-Asphalt Concrete) tebal 5 cm tiap 1m
BAHAN
- Agregat kasar = (CA x (D1 x t m3) x Fh1) : D2 (M03) 0.042 m
- Agregat halus = (FA x (D1 x t m3) x Fh1) : D2 (M04) 0.019 m
- Filler = (FF x (D1 x t m3) x Fh1) (M05) 6.002 kg
- Asphalt = (AS x (D1 x t m3) x Fh2) (M06) 8.269 kg
2-AHSP Hal.301/693
302
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
ASPHALT FINISHER
Kapasitas produksi alat V 40.000 Ton/jam
Efisiensi alat Fa 0.830
2-AHSP Hal.302/693
303
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
TENAGA
Produksi menentukan: AMP Q2 368.889 m/jam
Produksi HRS / hari = Tk x Q2 Qt 2,582.222 m/hari
Kebutuhan tenaga:
- Pekerja P 10.000 orang
- Mandor M 1.000 orang
Koefisien tenaga / m
- Pekerja = P : Qt 0.004 Oh
- Mandor = M : Qt 0.000 Oh
Harga bahan:
- Batu pecah/split 1/2 m 0.042 248,730
- Abu batu m 0.019 231,084
- Filler untuk hotmix (semen) kg 6.002 2,260
- Aspal Polimer Lokal kg 8.269 8,250
Upah tenaga:
- Pekerja Oh 0.004 98,019
- Mandor Oh 0.000 150,382
2-AHSP Hal.303/693
304
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
15. Pembuatan jalan aspal biasa (Sirtu t=10 cm, Agregat Kelas A t=20 cm, Permukaan Macadam t=5 cm) tiap m
Harga bahan:
- Sirtu m 0.120 237,740
- Batu pecah/split 3/5 m 0.040 238,167
- Batu pecah/split 2/3 m 0.176 249,560
- Batu pecah/split 1/2 m 0.011 248,730
- Abu batu m 0.003 231,084
- Aspal Polimer Lokal kg 4.800 2,260
- Minyak tanah Ltr 0.322 8,690
- Pasir urug m 0.086 248,706
Upah tenaga:
- Pekerja Oh 0.392 98,019
- Tukang aspal Oh 0.004 115,441
- Mandor Oh 0.014 150,382
21. Pembuatan jalan aspal beton t=3 cm (Sirtu = 10 cm, Agregat Kelas A t=20 cm, LATASTON HRS-WC = 3 cm) tiap m
Harga bahan:
- Sirtu m 0.120 237,740
- Batu pecah/split 2/3 m 0.154 249,560
- Pasir urug m 0.086 248,706
- Aspal Polimer Lokal kg 5.812 2,260
- Minyak Tanah Ltr 0.391 8,690
- Batu pecah/split 1/2 m 0.012 248,730
- Abu batu m 0.023 231,084
- Filler untuk hotmix (semen) kg 4.798 2,260
2-AHSP Hal.304/693
305
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.256 98,019
- Mandor Oh 0.011 150,382
22. Pembuatan jalan aspal beton t=3 cm lebar 3 m' tiap 1 m'
23. Pembuatan jalan aspal beton t=3 cm lebar 4 m' tiap 1 m'
24. Pembuatan jalan aspal beton t=3 cm lebar 5 m' tiap 1 m'
25. Pembuatan jalan aspal beton t=3 cm lebar 6 m' tiap 1 m'
26. Pembuatan jalan aspal beton t=3 cm lebar 8 m' tiap 1 m'
2-AHSP Hal.305/693
306
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
27. Pembuatan jalan aspal beton t=5 cm (Sirtu = 10 cm, Agregat Kelas A t=20 cm, LASTON AC-WC = 5 cm) tiap m
Harga bahan:
- Sirtu m 0.120 237,740
- Batu pecah/split 2/3 m 0.154 249,560
- Pasir urug m 0.086 248,706
- Aspal Polimer Lokal kg 8.782 2,260
- Minyak Tanah Ltr 0.391 8,690
- Batu pecah/split 1/2 m 0.042 248,730
- Abu batu m 0.019 231,084
- Filler untuk hotmix (semen) kg 6.002 2,260
Upah tenaga:
- Pekerja Oh 0.257 98,019
- Mandor Oh 0.011 150,382
28. Pembuatan jalan aspal beton t=5 cm lebar 3 m' tiap 1 m'
29. Pembuatan jalan aspal beton t=5 cm lebar 4 m' tiap 1 m'
30. Pembuatan jalan aspal beton t=5 cm lebar 5 m' tiap 1 m'
31. Pembuatan jalan aspal beton t=5 cm lebar 6 m' tiap 1 m'
32. Pembuatan jalan aspal beton t=5 cm lebar 8 m' tiap 1 m'
2-AHSP Hal.306/693
307
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
33. Pekerjaan paving parkir kendaraan (warna abu T-16 uk. 8x10,5x21) + urugan sirtu 20 cm + urugan pasir 5 cm tiap m
PLATE COMPACTOR
Kecepatan alat v 0.500 km/jam
Efisiensi alat Fa 0.830
Lebar pemadatan b 0.430 m'
Banyak lintasan (pass) n 6.000 lintasan
Harga bahan:
- Sirtu m 0.240 237,740
- Pasir urug m 0.060 248,706
- Paving abu-abu segi enam, tebal 8 cm m 1.100 78,322
- Abu batu m 0.018 231,084
Upah tenaga:
- Pekerja Oh 0.213 98,019
- Tukang batu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.016 150,382
2-AHSP Hal.307/693
308
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
34. Pekerjaan paving jalan setapak (warna abu T-16 uk. 8x10,5x21) + urugan sirtu 10 cm + urugan pasir 5 cm tiap m
PLATE COMPACTOR
Kecepatan alat v 0.500 km/jam
Efisiensi alat Fa 0.830
Lebar pemadatan b 0.430 m'
Banyak lintasan (pass) n 6.000 lintasan
Harga bahan:
- Sirtu m 0.120 237,740
- Pasir urug m 0.060 248,706
- Paving abu-abu segi enam, tebal 8 cm m 1.050 78,322
- Abu batu m 0.018 231,084
Upah tenaga:
- Pekerja Oh 0.188 98,019
- Tukang batu Oh 0.120 115,457
- Kepala tukang Oh 0.012 132,928
- Mandor Oh 0.014 150,382
2-AHSP Hal.308/693
309
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.076 98,019
- Tukang batu Oh 0.023 115,457
- Kepala tukang Oh 0.002 132,928
- Mandor Oh 0.005 150,382
2-AHSP Hal.309/693
310
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.500 98,019
- Tukang batu Oh 0.250 115,457
- Kepala tukang Oh 0.025 132,928
- Mandor Oh 0.025 150,382
Upah tenaga:
- Pekerja Oh 0.050 98,019
- Mandor Oh 0.025 150,382
2-AHSP Hal.310/693
311
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.080 98,019
- Tukang pasang pipa Oh 0.140 98,019
- Kepala tukang Oh 0.150 132,928
- Mandor Oh 0.100 150,382
2-AHSP Hal.311/693
312
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Instalator Oh 0.400 132,928
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Instalator Oh 0.400 132,928
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Instalator Oh 0.400 132,928
2-AHSP Hal.312/693
313
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Instalator Oh 0.400 132,928
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Instalator Oh 0.400 132,928
2-AHSP Hal.313/693
314
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Instalator Oh 0.400 132,928
Upah :
- Pekerja Oh 2.500 98,019
- Tukang batu Oh 0.417 115,457
- Kepala Tukang Oh 0.042 132,928
- Mandor Oh 0.008 150,382
Upah :
- Pekerja Oh 2.500 98,019
- Tukang batu Oh 0.417 115,457
- Kepala Tukang Oh 0.042 132,928
- Mandor Oh 0.008 150,382
2-AHSP Hal.314/693
315
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah :
- Pekerja Oh 2.500 98,019
- Tukang batu Oh 0.417 115,457
- Kepala Tukang Oh 0.042 132,928
- Mandor Oh 0.008 150,382
2-AHSP Hal.315/693
316
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah :
- Pekerja Oh 2.500 98,019
- Tukang batu Oh 0.417 115,457
- Kepala Tukang Oh 0.042 132,928
- Mandor Oh 0.008 150,382
Upah :
- Pekerja Oh 2.500 98,019
- Tukang batu Oh 0.417 115,457
- Kepala Tukang Oh 0.042 132,928
- Mandor Oh 0.008 150,382
Alat
wheel loader 1,0-1,6 M3 jam 0.019 #REF!
Bulldozer 140 hp jam 0.019
Alat Bantu ls 1.000 1,000
2-AHSP Hal.316/693
317
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
Err:508
2-AHSP Hal.317/693
318
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
2-AHSP Hal.318/693
319
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.150 132,928
- Pekerja Oh 0.075 98,019
2-AHSP Hal.319/693
320
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Instalator Oh 0.300 132,928
- Pekerja Oh 0.150 98,019
- Mandor Oh 0.015 150,382
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
Upah tenaga:
- Pekerja Oh 0.620 98,019
- Tukang batu Oh 0.350 115,457
- Kepala tukang Oh 0.035 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.320/693
321
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.600 98,019
- Tukang batu Oh 0.450 115,457
- Kepala tukang Oh 0.045 132,928
- Mandor Oh 0.030 150,382
2-AHSP Hal.321/693
322
HARGA SAT. DASAR
NO. URAIAN SAT KUANTI TAS
(Rp)
1 2 3 4.000 5
Upah tenaga:
- Pekerja Oh 0.300 98,019
- Tukang batu Oh 0.100 115,457
- Kepala tukang Oh 0.010 132,928
- Mandor Oh 0.010 150,382
2-AHSP Hal.322/693
323
RGA SATUAN PEKERJAAN (UNIT PRICE)
6 7
32,240.00
3,160.00
1,243.85
2,246.04
307,814.40
986.16
49,254.00
12,548.25
Jumlah Harga Bahan 409,492.70
39,207.60
23,088.20
2,658.56
3,007.64
Jumlah Upah Tenaga 67,962.00
Jumlah Total 477,454.70
Dibulatkan 477,450
25,792.00
2,528.00
1,243.85
2,246.04
986.16
163,920.00
Jumlah Harga Bahan 196,716.05
29,405.70
23,088.20
2,658.56
3,007.64
Jumlah Upah Tenaga 58,160.10
Jumlah Total 254,876.15
Dibulatkan 254,870
64,548.33
2,528.00
1,243.85
2,246.04
986.16
2-AHSP Hal.323/693
324
SUB TOTAL (Rp) HSP (Rp)
6 7
327,840.00
Jumlah Harga Bahan 399,392.38
29,405.70
23,088.20
2,658.56
3,007.64
Jumlah Upah Tenaga 58,160.10
Jumlah Total 457,552.48
Dibulatkan 457,550
77,280.75
2,528.00
1,243.85
2,246.04
986.16
3,278.40
Jumlah Harga Bahan 87,563.20
29,405.70
23,088.20
2,658.56
3,007.64
Jumlah Upah Tenaga 58,160.10
Jumlah Total 145,723.30
Dibulatkan 145,720
32,240.00
769,536.00
13,970.60
12,436.60
44,240.00
37,467.00
24,877.00
37,434.00
15,240.00
10,261.25
43,212.00
5,953.76
7,365.30
6,687.00
Jumlah Harga Bahan 1,060,920.51
98,019.00
230,882.00
2-AHSP Hal.324/693
325
SUB TOTAL (Rp) HSP (Rp)
6 7
115,457.00
39,878.40
7,519.10
Jumlah Upah Tenaga 491,755.50
Jumlah Total 1,552,676.01
Dibulatkan 1,552,670
25,280.00
9,950.80
16,620.70
204,782.08
4,437.72
1,653.87
72,399.40
47,530.11
11,688.85
3,558.87
4,678.03
2,253.11
3,829.96
4,243.05
42,752.00
18,536.67
1,216.26
146.55
Jumlah Harga Bahan 475,558.00
91,255.69
152,266.68
2,540.05
17,945.28
6,015.28
Jumlah Upah Tenaga 270,022.98
Jumlah Total 745,580.99
Dibulatkan 745,580
2-AHSP Hal.325/693
326
SUB TOTAL (Rp) HSP (Rp)
6 7
43,846.40
897,792.00
4,930.80
13,272.00
7,463.10
12,478.00
61,567.50
Jumlah Harga Bahan 1,041,349.80
98,019.00
230,882.00
26,585.60
7,519.10
Jumlah Upah Tenaga 363,005.70
Jumlah Total 1,404,355.50
Dibulatkan 1,404,350
36,752.25
21,435.03
2,497.80
Jumlah Harga Bahan 60,685.08
98,019.00
7,519.10
Jumlah Upah Tenaga 105,538.10
Jumlah Total 166,223.18
Dibulatkan 166,220
67,379.13
7,145.01
12,489.00
Jumlah Harga Bahan 87,013.14
98,019.00
15,038.20
Jumlah Upah Tenaga 113,057.20
Jumlah Total 200,070.34
Dibulatkan 200,070
32,439.17
51,302.40
328.72
2-AHSP Hal.326/693
327
SUB TOTAL (Rp) HSP (Rp)
6 7
9,801.90
11,544.10
1,329.28
751.91
Jumlah Upah Tenaga 23,427.19
Jumlah Total 107,497.48
Dibulatkan 107,490
19,603.80
Jumlah Upah Tenaga 19,603.80
Dibulatkan 19,600
2-AHSP Hal.327/693
328
SUB TOTAL (Rp) HSP (Rp)
6 7
9,801.90
7,519.10 0.005
Jumlah Upah Tenaga 17,321.00
Jumlah Total 17,321.00
Dibulatkan 17,320
4,900.95
751.91
Jumlah Upah Tenaga 5,652.86
Jumlah Total 5,652.86
Dibulatkan 5,650
73,514.25
3,759.55
Jumlah Upah Tenaga 77,273.80
Jumlah Total 77,273.80
Dibulatkan 77,270
88,217.10
6,767.19
Jumlah Upah Tenaga 94,984.29
Jumlah Total 94,984.29
Dibulatkan 94,980
102,919.95
10,075.59
Jumlah Upah Tenaga 112,995.54
Jumlah Total 112,995.54
Dibulatkan 112,990
98,019.00
4,812.22
Jumlah Upah Tenaga 102,831.22
Jumlah Total 102,831.22
Dibulatkan 102,830
147,028.50
9,022.92
2-AHSP Hal.328/693
329
SUB TOTAL (Rp) HSP (Rp)
6 7
117,622.80
6,767.19
Jumlah Upah Tenaga 124,389.99
Jumlah Total 124,389.99
Dibulatkan 124,380
50,577.80
7,519.10
Jumlah Upah Tenaga 58,096.90
Jumlah Total 58,096.90
Dibulatkan 58,090
2-AHSP Hal.329/693
330
SUB TOTAL (Rp) HSP (Rp)
6 7
24,504.75
1,248.17
Jumlah Upah Tenaga 25,752.92
Jumlah Total 25,752.92
Dibulatkan 25,750
213,000.00
Jumlah Harga Bahan 213,000.00
29,405.70
1,503.82
Jumlah Upah Tenaga 30,909.52
Jumlah Total 243,909.52
Dibulatkan 243,900
32,346.27
1,503.82
Jumlah Upah Tenaga 33,850.09
Dibulatkan 33,850
24,504.75
1,503.82
Jumlah Upah Tenaga 26,008.57
Dibulatkan 26,000
49,009.50
7,519.10
Jumlah Upah Tenaga 56,528.60
Jumlah Total 56,528.60
Dibulatkan 56,520
9,801.90
1,503.82
Jumlah Upah Tenaga 11,305.72
Jumlah Total 11,305.72
Dibulatkan 11,300
2-AHSP Hal.330/693
331
SUB TOTAL (Rp) HSP (Rp)
6 7
3 kali bolak-balik
7,114.18
Jumlah Bahan & Tenaga & Alat 7,114.18
Jumlah Total 7,114.18
Dibulatkan 7,114
2-AHSP Hal.331/693
332
SUB TOTAL (Rp) HSP (Rp)
6 7
1,424.31
Jumlah Bahan & Tenaga & Alat 1,424.31
Jumlah Total 1,424.31
Dibulatkan 1,425
5 kali bolak-balik
11,856.97
Jumlah Bahan & Tenaga & Alat 11,856.97
Jumlah Total 11,856.97
Dibulatkan 11,856
2,371.39
Jumlah Bahan & Tenaga & Alat 2,371.39
Jumlah Total 2,371.39
Dibulatkan 2,372
3 kali bolak-balik
1,244.65
Jumlah Bahan & Tenaga & Alat 1,244.65
Jumlah Total 1,244.65
2-AHSP Hal.332/693
333
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 1,245
262.03
Jumlah Bahan & Tenaga & Alat 262.03
Jumlah Total 262.03
Dibulatkan 263
285,288.00
Jumlah Harga Bahan 285,288.00
24,504.75
3,759.55
Jumlah Upah Tenaga 28,264.30
Jumlah Total 313,552.30
Dibulatkan 313,550
2-AHSP Hal.333/693
334
SUB TOTAL (Rp) HSP (Rp)
6 7
298,447.20
Jumlah Harga Bahan 298,447.20
29,405.70
1,503.82
Jumlah Upah Tenaga 30,909.52
Jumlah Total 329,356.72
Dibulatkan 329,350
213,000.00
Jumlah Harga Bahan 213,000.00
29,405.70
1,503.82
Jumlah Upah Tenaga 30,909.52
Jumlah Total 243,909.52
Dibulatkan 243,900
299,736.00
Jumlah Harga Bahan 299,736.00
29,405.70
1,503.82
Jumlah Upah Tenaga 30,909.52
Jumlah Total 330,645.52
Dibulatkan 330,640
11,757.35
Jumlah Harga Bahan 11,757.35
9,801.90
1,503.82
Jumlah Upah Tenaga 11,305.72
Jumlah Total 23,063.07
Dibulatkan 23,060
14,185.60
Jumlah Harga Bahan 14,185.60
9,801.90
1,503.82
2-AHSP Hal.334/693
335
SUB TOTAL (Rp) HSP (Rp)
6 7
46,722.00
Jumlah Harga Bahan 46,722.00
14,702.85
2,255.73
Jumlah Upah Tenaga 16,958.58
Jumlah Total 63,680.58
Dibulatkan 63,680
2-AHSP Hal.335/693
336
SUB TOTAL (Rp) HSP (Rp)
6 7
294,018.00
337,488.00
106,656.06
Jumlah Harga Bahan 738,162.06
147,028.50
69,274.20
7,975.68
11,278.65
Jumlah Upah Tenaga 235,557.03
Jumlah Total 973,719.09
Dibulatkan 973,710
294,018.00
255,328.00
121,143.30
Jumlah Harga Bahan 670,489.30
147,028.50
69,274.20
7,975.68
11,278.65
Jumlah Upah Tenaga 235,557.03
Jumlah Total 906,046.33
Dibulatkan 906,040
294,018.00
206,032.00
129,885.60
Jumlah Harga Bahan 629,935.60
147,028.50
69,274.20
7,975.68
11,278.65
Jumlah Upah Tenaga 235,557.03
Jumlah Total 865,492.63
Dibulatkan 865,490
294,018.00
2-AHSP Hal.336/693
337
SUB TOTAL (Rp) HSP (Rp)
6 7
171,904.00
135,880.32
Jumlah Harga Bahan 601,802.32
147,028.50
69,274.20
7,975.68
11,278.65
Jumlah Upah Tenaga 235,557.03
Jumlah Total 837,359.35
Dibulatkan 837,350
2-AHSP Hal.337/693
338
SUB TOTAL (Rp) HSP (Rp)
6 7
294,018.00
107,440.99
Jumlah Harga Bahan 401,458.99
76,454.82
45,028.23
5,184.19
5,864.90
Jumlah Upah Tenaga 132,532.14
Jumlah Total 533,991.13
Dibulatkan 533,990
694,875.00
255,328.00
79,606.40
121,877.70
14,417.60
Jumlah Harga Bahan 1,166,104.70
294,057.00
98,138.45
11,298.88
22,557.30
Jumlah Upah Tenaga 426,051.63
Jumlah Total 1,592,156.33
Dibulatkan 1,592,150
110,256.75
245,216.00
77,616.24
116,405.64
Jumlah Harga Bahan 549,494.63
233,285.22
34,637.10
3,987.84
12,030.56
Jumlah Upah Tenaga 283,940.72
Jumlah Total 833,435.35
Dibulatkan 833,430
2-AHSP Hal.338/693
339
SUB TOTAL (Rp) HSP (Rp)
6 7
71,120.00
54,984.00
19,982.40
Jumlah Harga Bahan 146,086.40
58,811.40
23,091.40
2,658.56
4,511.46
Jumlah Upah Tenaga 89,072.82
Jumlah Total 235,159.22
Dibulatkan 235,150
2-AHSP Hal.339/693
340
SUB TOTAL (Rp) HSP (Rp)
6 7
71,120.00
33,559.20
23,229.54
Jumlah Harga Bahan 127,908.74
58,811.40
23,091.40
2,658.56
4,511.46
Jumlah Upah Tenaga 89,072.82
Jumlah Total 216,981.56
Dibulatkan 216,980
35,560.00
23,952.80
9,491.64
Jumlah Harga Bahan 69,004.44
29,405.70
11,545.70
1,329.28
2,255.73
Jumlah Upah Tenaga 44,536.41
Jumlah Total 113,540.85
Dibulatkan 113,540
35,560.00
14,536.00
10,740.54
Jumlah Harga Bahan 60,836.54
29,405.70
11,545.70
1,329.28
2,255.73
Jumlah Upah Tenaga 44,536.41
Jumlah Total 105,372.95
Dibulatkan 105,370
35,560.00
12,235.52
11,240.10
2-AHSP Hal.340/693
341
SUB TOTAL (Rp) HSP (Rp)
6 7
29,405.70
11,545.70
1,329.28
2,255.73
Jumlah Upah Tenaga 44,536.41
Jumlah Total 103,572.03
Dibulatkan 103,570
2-AHSP Hal.341/693
342
SUB TOTAL (Rp) HSP (Rp)
6 7
323,596.00
217,749.28
86,174.10
Jumlah Harga Bahan 627,519.38
284,255.10
103,911.30
11,963.52
20,451.95
Jumlah Upah Tenaga 420,581.87
Jumlah Total 1,048,101.25
Dibulatkan 1,048,100
323,596.00
132,151.20
97,663.98
Jumlah Harga Bahan 553,411.18
284,255.10
103,911.30
11,963.52
20,451.95
Jumlah Upah Tenaga 420,581.87
Jumlah Total 973,993.05
Dibulatkan 973,990
28,975.00
15,800.00
9,991.20
Jumlah Harga Bahan 54,766.20
49,009.50
11,545.70
1,329.28
3,759.55
Jumlah Upah Tenaga 65,644.03
Jumlah Total 120,410.23
Dibulatkan 120,410
64,351.80
2-AHSP Hal.342/693
343
SUB TOTAL (Rp) HSP (Rp)
6 7
9,480.00
Jumlah Harga Bahan 73,831.80
29,405.70
17,318.55
1,993.92
2,255.73
Jumlah Upah Tenaga 50,973.90
Jumlah Total 124,805.70
Dibulatkan 124,800
2-AHSP Hal.343/693
344
SUB TOTAL (Rp) HSP (Rp)
6 7
85,965.60
12,640.00
Jumlah Harga Bahan 98,605.60
29,405.70
17,318.55
1,993.92
2,255.73
Jumlah Upah Tenaga 50,973.90
Jumlah Total 149,579.50
Dibulatkan 149,570
8,128.00
3,086.69
2,802.53
Jumlah Harga Bahan 14,017.22
7,008.36
2,540.05
292.44
496.26
Jumlah Upah Tenaga 10,337.11
Jumlah Total 24,354.33
Dibulatkan 24,350
16,256.00
9,249.95
6,843.97
Jumlah Harga Bahan 32,349.92
17,055.31
6,234.68
717.81
1,203.06
Jumlah Upah Tenaga 25,210.85
Jumlah Total 57,560.78
Dibulatkan 57,560
72,375.00
31,043.84
19,283.02
2,683.52
2-AHSP Hal.344/693
345
SUB TOTAL (Rp) HSP (Rp)
6 7
29,405.70
17,318.55
1,993.92
2,255.73
Jumlah Upah Tenaga 50,973.90
Jumlah Total 176,359.28
Dibulatkan 176,350
2-AHSP Hal.345/693
346
SUB TOTAL (Rp) HSP (Rp)
6 7
54,250.00
23,004.80
14,537.20
2,683.52
Jumlah Harga Bahan 94,475.52
35,286.84
13,854.84
1,595.14
2,706.88
Jumlah Upah Tenaga 53,443.69
Jumlah Total 147,919.21
Dibulatkan 147,910
36,250.00
15,332.32
9,691.46
2,683.52
Jumlah Harga Bahan 63,957.30
29,405.70
11,545.70
1,329.28
2,255.73
Jumlah Upah Tenaga 44,536.41
Jumlah Total 108,493.71
Dibulatkan 108,490
151,740.00
17,696.00
7,992.96
Jumlah Harga Bahan 177,428.96
29,405.70
11,545.70
1,329.28
2,255.73
Jumlah Upah Tenaga 44,536.41
Jumlah Total 221,965.37
Dibulatkan 221,960
161,276.00
2-AHSP Hal.346/693
347
SUB TOTAL (Rp) HSP (Rp)
6 7
13,208.80
9,491.64
Jumlah Harga Bahan 183,976.44
29,405.70
11,545.70
1,329.28
2,255.73
Jumlah Upah Tenaga 44,536.41
Jumlah Total 228,512.85
Dibulatkan 228,510
2-AHSP Hal.347/693
348
SUB TOTAL (Rp) HSP (Rp)
6 7
468,050.00
14,536.00
10,490.76
Jumlah Harga Bahan 493,076.76
35,286.84
13,854.84
1,595.14
2,706.88
Jumlah Upah Tenaga 53,443.69
Jumlah Total 546,520.45
Dibulatkan 546,520
12,923.14
4,995.60
Jumlah Harga Bahan 17,918.74
19,603.80
17,318.55
1,993.92
1,503.82
Jumlah Upah Tenaga 40,420.09
Jumlah Total 58,338.83
Dibulatkan 58,330
9,828.86
5,744.94
Jumlah Harga Bahan 15,573.80
19,603.80
17,318.55
1,993.92
1,503.82
Jumlah Upah Tenaga 40,420.09
Jumlah Total 55,993.89
Dibulatkan 55,990
7,887.36
2-AHSP Hal.348/693
349
SUB TOTAL (Rp) HSP (Rp)
6 7
5,994.72
Jumlah Harga Bahan 13,882.08
19,603.80
17,318.55
1,993.92
1,503.82
Jumlah Upah Tenaga 40,420.09
Jumlah Total 54,302.17
Dibulatkan 54,300
55,990.00
90,000.00
37,000.00
37,190.00
10,000.00
Jumlah Total 230,180
Dibulatkan 230,180
2-AHSP Hal.349/693
350
SUB TOTAL (Rp) HSP (Rp)
6 7
17,230.85
6,744.06
Jumlah Harga Bahan 23,974.91
25,484.94
23,091.40
2,658.56
1,954.97
Jumlah Upah Tenaga 53,189.87
Jumlah Total 77,164.77
Dibulatkan 77,160
13,105.15
7,743.18
Jumlah Harga Bahan 20,848.33
25,484.94
23,091.40
2,658.56
1,954.97
Jumlah Upah Tenaga 53,189.87
Jumlah Total 74,038.20
Dibulatkan 74,030
10,516.48
7,992.96
Jumlah Harga Bahan 18,509.44
25,484.94
23,091.40
2,658.56
1,954.97
Jumlah Upah Tenaga 53,189.87
Jumlah Total 71,699.31
Dibulatkan 71,690
19,592.00
3,247.14
Jumlah Harga Bahan 22,839.14
29,405.70
23,091.40
2-AHSP Hal.350/693
351
SUB TOTAL (Rp) HSP (Rp)
6 7
2,658.56
1,954.97
Jumlah Upah Tenaga 57,110.63
Jumlah Total 79,949.77
Dibulatkan 79,940
14,852.00
8,742.30
Jumlah Harga Bahan 23,594.30
29,405.70
23,091.40
2,658.56
1,954.97
Jumlah Upah Tenaga 57,110.63
Jumlah Total 80,704.93
Dibulatkan 80,700
2-AHSP Hal.351/693
352
SUB TOTAL (Rp) HSP (Rp)
6 7
11,982.72
9,491.64
Jumlah Harga Bahan 21,474.36
29,405.70
23,091.40
2,658.56
1,954.97
Jumlah Upah Tenaga 57,110.63
Jumlah Total 78,584.99
Dibulatkan 78,580
42,350.00
Jumlah Harga Bahan 42,350.00
25,484.94
17,318.55
1,993.92
1,503.82
Jumlah Upah Tenaga 46,301.23
Jumlah Total 88,651.23
Dibulatkan 88,650
8,936.48
5,245.38
Jumlah Harga Bahan 14,181.86
14,702.85
8,081.99
930.50
1,203.06
Jumlah Upah Tenaga 24,918.39
Jumlah Total 39,100.25
Dibulatkan 39,100
6,552.58
6,494.28
Jumlah Harga Bahan 13,046.86
14,702.85
8,081.99
930.50
2-AHSP Hal.352/693
353
SUB TOTAL (Rp) HSP (Rp)
6 7
1,203.06
Jumlah Upah Tenaga 24,918.39
Jumlah Total 37,965.25
Dibulatkan 37,960
632.00
3,247.14
Jumlah Harga Bahan 3,879.14
5,587.08
4,387.37
5,051.26
451.15
Jumlah Upah Tenaga 15,476.86
Jumlah Total 19,356.00
Dibulatkan 19,350
2-AHSP Hal.353/693
354
SUB TOTAL (Rp) HSP (Rp)
6 7
5,460.48
1,498.68
Jumlah Harga Bahan 6,959.16
24,504.75
11,545.70
1,329.28
1,954.97
Jumlah Upah Tenaga 39,334.70
Jumlah Total 46,293.86
Dibulatkan 46,290
8,013.76
2,997.36
Jumlah Harga Bahan 11,011.12
29,405.70
16,163.98
1,860.99
2,255.73
Jumlah Upah Tenaga 49,686.40
Jumlah Total 60,697.52
Dibulatkan 60,690
4,108.00
Jumlah Harga Bahan 4,108.00
14,702.85
11,545.70
1,329.28
1,203.06
Jumlah Upah Tenaga 28,780.89
Jumlah Total 32,888.89
Dibulatkan 32,880
11,850.00
Jumlah Harga Bahan 11,850.00
14,702.85
11,545.70
1,329.28
1,203.06
2-AHSP Hal.354/693
355
SUB TOTAL (Rp) HSP (Rp)
6 7
49,500,000.00
20,545.00
32,417.00
Jumlah Harga Bahan 49,552,962.00
588,114.00
2,309,140.00
265,856.00
45,114.60
Jumlah Upah Tenaga 3,208,224.60
Jumlah Total 52,761,186.60
Dibulatkan 52,761,180
2-AHSP Hal.355/693
356
SUB TOTAL (Rp) HSP (Rp)
6 7
11,709,000.00
20,545.00
32,417.00
Jumlah Harga Bahan 11,761,962.00
588,114.00
2,078,226.00
265,856.00
45,114.60
Jumlah Upah Tenaga 2,977,310.60
Jumlah Total 14,739,272.60
Dibulatkan 14,739,270
10,583,000.40
20,545.00
32,417.00
Jumlah Harga Bahan 10,635,962.40
588,114.00
2,078,226.00
265,856.00
45,114.60
Jumlah Upah Tenaga 2,977,310.60
Jumlah Total 13,613,273.00
Dibulatkan 13,613,270
5,141,400.00
20,545.00
32,417.00
Jumlah Harga Bahan 5,194,362.00
588,114.00
2,078,226.00
265,856.00
45,114.60
Jumlah Upah Tenaga 2,977,310.60
Jumlah Total 8,171,672.60
Dibulatkan 8,171,670
8,150,250.00
20,545.00
32,417.00
2-AHSP Hal.356/693
357
SUB TOTAL (Rp) HSP (Rp)
6 7
588,114.00
2,078,226.00
265,856.00
45,114.60
Jumlah Upah Tenaga 2,977,310.60
Jumlah Total 11,180,522.60
Dibulatkan 11,180,520
2-AHSP Hal.357/693
358
SUB TOTAL (Rp) HSP (Rp)
6 7
1,800,000.00
16,208.50
Jumlah Harga Bahan 1,816,208.50
98,019.00
288,642.50
33,232.00
7,519.10
Jumlah Upah Tenaga 427,412.60
Jumlah Total 2,243,621.10
Dibulatkan 2,243,620
412,300.00
16,208.50
Jumlah Harga Bahan 428,508.50
98,019.00
288,642.50
33,232.00
7,519.10
Jumlah Upah Tenaga 427,412.60
Jumlah Total 855,921.10
Dibulatkan 855,920
362,300.00
16,208.50
Jumlah Harga Bahan 378,508.50
98,019.00
288,642.50
33,232.00
7,519.10
Jumlah Upah Tenaga 427,412.60
Jumlah Total 805,921.10
Dibulatkan 805,920
301,758.36
16,208.50
Jumlah Harga Bahan 317,966.86
98,019.00
288,642.50
2-AHSP Hal.358/693
359
SUB TOTAL (Rp) HSP (Rp)
6 7
33,232.00
7,519.10
Jumlah Upah Tenaga 427,412.60
Jumlah Total 745,379.46
Dibulatkan 745,370
185,366.68
16,208.50
Jumlah Harga Bahan 201,575.18
98,019.00
288,642.50
33,232.00
7,519.10
Jumlah Upah Tenaga 427,412.60
Jumlah Total 628,987.78
Dibulatkan 628,980
2-AHSP Hal.359/693
360
SUB TOTAL (Rp) HSP (Rp)
6 7
1,080,000.00
9,725.10
Jumlah Harga Bahan 1,089,725.10
78,415.20
230,914.00
26,585.60
6,015.28
Jumlah Upah Tenaga 341,930.08
Jumlah Total 1,431,655.18
Dibulatkan 1,431,650
247,380.00
9,725.10
Jumlah Harga Bahan 257,105.10
78,415.20
230,914.00
26,585.60
6,015.28
Jumlah Upah Tenaga 341,930.08
Jumlah Total 599,035.18
Dibulatkan 599,030
217,380.00
9,725.10
Jumlah Harga Bahan 227,105.10
78,415.20
230,914.00
26,585.60
6,015.28
Jumlah Upah Tenaga 341,930.08
Jumlah Total 569,035.18
Dibulatkan 569,030
111,220.01
9,725.10
Jumlah Harga Bahan 120,945.11
78,415.20
230,914.00
2-AHSP Hal.360/693
361
SUB TOTAL (Rp) HSP (Rp)
6 7
26,585.60
6,015.28
Jumlah Upah Tenaga 341,930.08
Jumlah Total 462,875.19
Dibulatkan 462,870
181,055.02
9,725.10
Jumlah Harga Bahan 190,780.12
78,415.20
230,914.00
26,585.60
6,015.28
Jumlah Upah Tenaga 341,930.08
Jumlah Total 532,710.20
Dibulatkan 532,710
2-AHSP Hal.361/693
362
SUB TOTAL (Rp) HSP (Rp)
6 7
2,880,000.00
16,208.50
Jumlah Harga Bahan 2,896,208.50
98,019.00
346,371.00
39,878.40
7,519.10
Jumlah Upah Tenaga 491,787.50
Jumlah Total 3,387,996.00
Dibulatkan 3,387,990
659,680.00
16,208.50
Jumlah Harga Bahan 675,888.50
98,019.00
346,371.00
39,878.40
7,519.10
Jumlah Upah Tenaga 491,787.50
Jumlah Total 1,167,676.00
Dibulatkan 1,167,670
579,680.00
16,208.50
Jumlah Harga Bahan 595,888.50
98,019.00
346,371.00
39,878.40
7,519.10
Jumlah Upah Tenaga 491,787.50
Jumlah Total 1,087,676.00
Dibulatkan 1,087,670
579,680.00
16,208.50
Jumlah Harga Bahan 595,888.50
98,019.00
346,371.00
2-AHSP Hal.362/693
363
SUB TOTAL (Rp) HSP (Rp)
6 7
39,878.40
7,519.10
Jumlah Upah Tenaga 491,787.50
Jumlah Total 1,087,676.00
Dibulatkan 1,087,670
296,586.69
16,208.50
Jumlah Harga Bahan 312,795.19
98,019.00
346,371.00
39,878.40
7,519.10
Jumlah Upah Tenaga 491,787.50
Jumlah Total 804,582.69
Dibulatkan 804,580
2-AHSP Hal.363/693
364
SUB TOTAL (Rp) HSP (Rp)
6 7
482,813.38
16,208.50
Jumlah Harga Bahan 499,021.88
98,019.00
346,371.00
39,878.40
7,519.10
Jumlah Upah Tenaga 491,787.50
Jumlah Total 990,809.38
Dibulatkan 990,800
2,700,000.00
3,140.25
Jumlah Harga Bahan 2,703,140.25
49,009.50
230,914.00
26,585.60
3,759.55
Jumlah Upah Tenaga 310,268.65
Jumlah Total 3,013,408.90
Dibulatkan 3,013,400
618,450.00
3,140.25
Jumlah Harga Bahan 621,590.25
49,009.50
230,914.00
26,585.60
3,759.55
Jumlah Upah Tenaga 310,268.65
Jumlah Total 931,858.90
Dibulatkan 931,850
543,450.00
3,140.25
Jumlah Harga Bahan 546,590.25
49,009.50
230,914.00
2-AHSP Hal.364/693
365
SUB TOTAL (Rp) HSP (Rp)
6 7
26,585.60
3,759.55
Jumlah Upah Tenaga 310,268.65
Jumlah Total 856,858.90
Dibulatkan 856,850
257,687.50
628.05
16,208.50
111,450.00
Jumlah Harga Bahan 385,974.05
58,811.40
230,914.00
26,585.60
4,511.46
Jumlah Upah Tenaga 320,822.46
Jumlah Total 706,796.51
Dibulatkan 706,790
2-AHSP Hal.365/693
366
SUB TOTAL (Rp) HSP (Rp)
6 7
226,437.50
628.05
16,208.50
111,450.00
Jumlah Harga Bahan 354,724.05
58,811.40
230,914.00
26,585.60
4,511.46
Jumlah Upah Tenaga 320,822.46
Jumlah Total 675,546.51
Dibulatkan 675,540
115,854.18
628.05
16,208.50
111,450.00
Jumlah Harga Bahan 244,140.73
58,811.40
230,914.00
26,585.60
4,511.46
Jumlah Upah Tenaga 320,822.46
Jumlah Total 564,963.19
Dibulatkan 564,960
226,437.50
628.05
16,208.50
60,891.00
Jumlah Harga Bahan 304,165.05
58,811.40
230,914.00
26,585.60
4,511.46
Jumlah Upah Tenaga 320,822.46
Jumlah Total 624,987.51
Dibulatkan 624,980
2-AHSP Hal.366/693
367
SUB TOTAL (Rp) HSP (Rp)
6 7
115,854.18
628.05
16,208.50
60,891.00
Jumlah Harga Bahan 193,581.73
58,811.40
230,914.00
26,585.60
4,511.46
Jumlah Upah Tenaga 320,822.46
Jumlah Total 514,404.19
Dibulatkan 514,400
2-AHSP Hal.367/693
368
SUB TOTAL (Rp) HSP (Rp)
6 7
257,687.50
6,280.50
25,933.60
111,450.00
65,007.50
Jumlah Harga Bahan 466,359.10
78,415.20
288,642.50
33,232.00
6,015.28
Jumlah Upah Tenaga 406,304.98
Jumlah Total 872,664.08
Dibulatkan 872,660
226,437.50
6,280.50
25,933.60
111,450.00
65,007.50
Jumlah Harga Bahan 435,109.10
78,415.20
288,642.50
33,232.00
6,015.28
Jumlah Upah Tenaga 406,304.98
Jumlah Total 841,414.08
Dibulatkan 841,410
115,854.18
6,280.50
25,933.60
111,450.00
65,007.50
Jumlah Harga Bahan 324,525.78
78,415.20
288,642.50
33,232.00
6,015.28
Jumlah Upah Tenaga 406,304.98
Jumlah Total 730,830.76
2-AHSP Hal.368/693
369
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 730,830
226,437.50
6,280.50
25,933.60
111,450.00
65,007.50
Jumlah Harga Bahan 435,109.10
78,415.20
288,642.50
33,232.00
6,015.28
Jumlah Upah Tenaga 406,304.98
Jumlah Total 841,414.08
Dibulatkan 841,410
2-AHSP Hal.369/693
370
SUB TOTAL (Rp) HSP (Rp)
6 7
115,854.18
6,280.50
25,933.60
111,450.00
65,007.50
Jumlah Harga Bahan 324,525.78
78,415.20
288,642.50
33,232.00
6,015.28
Jumlah Upah Tenaga 406,304.98
Jumlah Total 730,830.76
Dibulatkan 730,830
115,854.18
6,280.50
38,900.40
111,450.00
130,015.00
Jumlah Harga Bahan 402,500.08
98,019.00
300,188.20
34,561.28
7,519.10
Jumlah Upah Tenaga 440,287.58
Jumlah Total 842,787.66
Dibulatkan 842,780
29,892.50
418.70
8,341.50
Jumlah Harga Bahan 38,652.70
9,801.90
11,545.70
1,329.28
75.19
Jumlah Upah Tenaga 22,752.07
Jumlah Total 61,404.77
Dibulatkan 61,400
2-AHSP Hal.370/693
371
SUB TOTAL (Rp) HSP (Rp)
6 7
16,681.50
418.70
8,341.50
Jumlah Harga Bahan 25,441.70
9,801.90
11,545.70
1,329.28
75.19
Jumlah Upah Tenaga 22,752.07
Jumlah Total 48,193.77
Dibulatkan 48,190
2-AHSP Hal.371/693
372
SUB TOTAL (Rp) HSP (Rp)
6 7
27,291.00
418.70
8,341.50
Jumlah Harga Bahan 36,051.20
9,801.90
11,545.70
1,329.28
75.19
Jumlah Upah Tenaga 22,752.07
Jumlah Total 58,803.27
Dibulatkan 58,800
7,471,062.50
169,590.00
92,041.60
Jumlah Harga Bahan 7,732,694.10
392,076.00
1,385,484.00
159,513.60
30,076.40
Jumlah Upah Tenaga 1,967,150.00
Jumlah Total 9,699,844.10
Dibulatkan 9,699,840
9,701,083.70
169,590.00
92,041.60
Jumlah Harga Bahan 9,962,715.30
392,076.00
1,385,484.00
159,513.60
30,076.40
Jumlah Upah Tenaga 1,967,150.00
Jumlah Total 11,929,865.30
Dibulatkan 11,929,860
2-AHSP Hal.372/693
373
SUB TOTAL (Rp) HSP (Rp)
6 7
11,709,000.00
169,590.00
92,041.60
Jumlah Harga Bahan 11,970,631.60
588,114.00
2,309,140.00
265,856.00
45,114.60
Jumlah Upah Tenaga 3,208,224.60
Jumlah Total 15,178,856.20
Dibulatkan 15,178,850
2-AHSP Hal.373/693
374
SUB TOTAL (Rp) HSP (Rp)
6 7
9,701,083.70
169,590.00
49,308.00
Jumlah Harga Bahan 9,919,981.70
235,245.60
831,290.40
95,708.16
18,045.84
Jumlah Upah Tenaga 1,180,290.00
Jumlah Total 11,100,271.70
Dibulatkan 11,100,270
122,413.68
24,483.00
4,109.00
Jumlah Harga Bahan 151,005.68
9,801.90
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 23,428.79
Jumlah Total 174,434.47
Dibulatkan 174,430
59,852.80
15,490.80
4,109.00
Jumlah Harga Bahan 79,452.60
9,801.90
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 23,428.79
Jumlah Total 102,881.39
Dibulatkan 102,880
122,413.68
24,483.00
4,109.00
2-AHSP Hal.374/693
375
SUB TOTAL (Rp) HSP (Rp)
6 7
9,801.90
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 23,428.79
Jumlah Total 174,434.47
Dibulatkan 174,430
2-AHSP Hal.375/693
376
SUB TOTAL (Rp) HSP (Rp)
6 7
59,852.80
15,490.80
4,109.00
Jumlah Harga Bahan 79,452.60
9,801.90
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 23,428.79
Jumlah Total 102,881.39
Dibulatkan 102,880
122,413.68
38,764.75
4,109.00
Jumlah Harga Bahan 165,287.43
9,801.90
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 23,428.79
Jumlah Total 188,716.22
Dibulatkan 188,710
59,852.80
24,527.10
4,109.00
Jumlah Harga Bahan 88,488.90
9,801.90
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 23,428.79
Jumlah Total 111,917.69
Dibulatkan 111,910
1,442,732.61
3,287.20
Jumlah Harga Bahan 1,446,019.81
2-AHSP Hal.376/693
377
SUB TOTAL (Rp) HSP (Rp)
6 7
11,762.28
13,854.84
1,595.14
902.29
Jumlah Upah Tenaga 28,114.55
Jumlah Total 1,474,134.36
Dibulatkan 1,474,130
65,214.00
821.80
Jumlah Harga Bahan 66,035.80
9,801.90
23,091.40
2,658.56
751.91
Jumlah Upah Tenaga 36,303.77
Jumlah Total 102,339.57
Dibulatkan 102,330
2-AHSP Hal.377/693
378
SUB TOTAL (Rp) HSP (Rp)
6 7
65,214.00
821.80
Jumlah Harga Bahan 66,035.80
9,801.90
23,091.40
2,658.56
751.91
Jumlah Upah Tenaga 36,303.77
Jumlah Total 102,339.57
Dibulatkan 102,330
33,366.00
821.80
Jumlah Harga Bahan 34,187.80
9,801.90
23,091.40
2,658.56
751.91
Jumlah Upah Tenaga 36,303.77
Jumlah Total 70,491.57
Dibulatkan 70,490
99,632.50
821.80
Jumlah Harga Bahan 100,454.30
10,782.09
25,400.54
2,924.42
751.91
Jumlah Upah Tenaga 39,858.96
Jumlah Total 140,313.26
Dibulatkan 140,310
99,632.50
821.80
Jumlah Harga Bahan 100,454.30
10,782.09
2-AHSP Hal.378/693
379
SUB TOTAL (Rp) HSP (Rp)
6 7
25,400.54
2,924.42
751.91
Jumlah Upah Tenaga 39,858.96
Jumlah Total 140,313.26
Dibulatkan 140,310
50,975.84
821.80
Jumlah Harga Bahan 51,797.64
10,782.09
25,400.54
2,924.42
751.91
Jumlah Upah Tenaga 39,858.96
Jumlah Total 91,656.59
Dibulatkan 91,650
2-AHSP Hal.379/693
380
SUB TOTAL (Rp) HSP (Rp)
6 7
79,706.00
986.16
Jumlah Harga Bahan 80,692.16
9,801.90
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 23,428.79
Jumlah Total 104,120.95
Dibulatkan 104,120
79,706.00
986.16
Jumlah Harga Bahan 80,692.16
9,801.90
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 23,428.79
Jumlah Total 104,120.95
Dibulatkan 104,120
40,780.67
986.16
Jumlah Harga Bahan 41,766.83
9,801.90
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 23,428.79
Jumlah Total 65,195.62
Dibulatkan 65,190
170,020.85
14,110.00
6,280.50
Jumlah Harga Bahan 190,411.35
58,811.40
2-AHSP Hal.380/693
381
SUB TOTAL (Rp) HSP (Rp)
6 7
207,822.60
23,927.04
4,511.46
Jumlah Upah Tenaga 295,072.50
Jumlah Total 485,483.85
Dibulatkan 485,480
15,435.00
39,690.00
3,454.60
Jumlah Harga Bahan 58,579.60
11,762.28
13,854.84
1,595.14
902.29
Jumlah Upah Tenaga 28,114.55
Jumlah Total 86,694.15
Dibulatkan 86,690
2-AHSP Hal.381/693
382
SUB TOTAL (Rp) HSP (Rp)
6 7
105,830.00
1,643.60
Jumlah Harga Bahan 107,473.60
14,702.85
28,864.25
3,323.20
1,127.87
Jumlah Upah Tenaga 48,018.17
Jumlah Total 155,491.77
Dibulatkan 155,490
105,830.00
1,643.60
Jumlah Harga Bahan 107,473.60
14,702.85
28,864.25
3,323.20
1,127.87
Jumlah Upah Tenaga 48,018.17
Jumlah Total 155,491.77
Dibulatkan 155,490
51,414.00
1,643.60
Jumlah Harga Bahan 53,057.60
14,702.85
28,864.25
3,323.20
1,127.87
Jumlah Upah Tenaga 48,018.17
Jumlah Total 101,075.77
Dibulatkan 101,070
135,815.17
3,287.20
Jumlah Harga Bahan 139,102.37
2-AHSP Hal.382/693
383
SUB TOTAL (Rp) HSP (Rp)
6 7
14,702.85
28,864.25
3,323.20
1,127.87
Jumlah Upah Tenaga 48,018.17
Jumlah Total 187,120.54
Dibulatkan 187,120
135,815.17
3,287.20
Jumlah Harga Bahan 139,102.37
14,702.85
28,864.25
3,323.20
1,127.87
Jumlah Upah Tenaga 48,018.17
Jumlah Total 187,120.54
Dibulatkan 187,120
2-AHSP Hal.383/693
384
SUB TOTAL (Rp) HSP (Rp)
6 7
65,981.30
3,287.20
Jumlah Harga Bahan 69,268.50
14,702.85
28,864.25
3,323.20
1,127.87
Jumlah Upah Tenaga 48,018.17
Jumlah Total 117,286.67
Dibulatkan 117,280
114,649.17
1,643.60
Jumlah Harga Bahan 116,292.77
15,683.04
30,018.82
3,456.13
1,203.06
Jumlah Upah Tenaga 50,361.04
Jumlah Total 166,653.82
Dibulatkan 166,650
114,649.17
1,643.60
Jumlah Harga Bahan 116,292.77
15,683.04
30,018.82
3,456.13
1,203.06
Jumlah Upah Tenaga 50,361.04
Jumlah Total 166,653.82
Dibulatkan 166,650
55,698.50
1,643.60
Jumlah Harga Bahan 57,342.10
15,683.04
30,018.82
2-AHSP Hal.384/693
385
SUB TOTAL (Rp) HSP (Rp)
6 7
3,456.13
1,203.06
Jumlah Upah Tenaga 50,361.04
Jumlah Total 107,703.14
Dibulatkan 107,700
143,752.42
4,109.00
Jumlah Harga Bahan 147,861.42
19,603.80
34,637.10
3,987.84
1,503.82
Jumlah Upah Tenaga 59,732.56
Jumlah Total 207,593.98
Dibulatkan 207,590
2-AHSP Hal.385/693
386
SUB TOTAL (Rp) HSP (Rp)
6 7
143,752.42
4,109.00
Jumlah Harga Bahan 147,861.42
19,603.80
34,637.10
3,987.84
1,503.82
Jumlah Upah Tenaga 59,732.56
Jumlah Total 207,593.98
Dibulatkan 207,590
69,837.35
4,109.00
Jumlah Harga Bahan 73,946.35
19,603.80
34,637.10
3,987.84
1,503.82
Jumlah Upah Tenaga 59,732.56
Jumlah Total 133,678.91
Dibulatkan 133,670
202,840.84
2,465.40
Jumlah Harga Bahan 205,306.24
19,603.80
34,637.10
3,987.84
1,503.82
Jumlah Upah Tenaga 59,732.56
Jumlah Total 265,038.80
Dibulatkan 265,030
202,840.84
2,465.40
Jumlah Harga Bahan 205,306.24
19,603.80
34,637.10
2-AHSP Hal.386/693
387
SUB TOTAL (Rp) HSP (Rp)
6 7
3,987.84
1,503.82
Jumlah Upah Tenaga 59,732.56
Jumlah Total 265,038.80
Dibulatkan 265,030
98,543.50
2,465.40
Jumlah Harga Bahan 101,008.90
19,603.80
34,637.10
3,987.84
1,503.82
Jumlah Upah Tenaga 59,732.56
Jumlah Total 160,741.46
Dibulatkan 160,740
2-AHSP Hal.387/693
388
SUB TOTAL (Rp) HSP (Rp)
6 7
32,340.00
209.35
Jumlah Harga Bahan 32,549.35
4,900.95
5,772.85
664.64
451.15
Jumlah Upah Tenaga 11,789.59
Jumlah Total 44,338.94
Dibulatkan 44,330
4,981.63
1,046.75
Jumlah Harga Bahan 6,028.38
3,920.76
13,854.84
1,595.14
300.76
Jumlah Upah Tenaga 19,671.50
Jumlah Total 25,699.88
Dibulatkan 25,690
1,830.33
1,046.75
Jumlah Harga Bahan 2,877.08
3,920.76
13,854.84
1,595.14
300.76
Jumlah Upah Tenaga 19,671.50
Jumlah Total 22,548.58
Dibulatkan 22,540
13,665.30
2,141.65
72.15
Jumlah Harga Bahan 15,879.10
11,027.14
2-AHSP Hal.388/693
389
SUB TOTAL (Rp) HSP (Rp)
6 7
4,329.64
491.83
977.48
Jumlah Upah Tenaga 16,826.09
Jumlah Total 32,705.19
Dibulatkan 32,700
20,620.60
2,677.06
90.71
Jumlah Harga Bahan 23,388.37
11,027.14
4,329.64
491.83
977.48
Jumlah Upah Tenaga 16,826.09
Jumlah Total 40,214.46
Dibulatkan 40,210
2-AHSP Hal.389/693
390
SUB TOTAL (Rp) HSP (Rp)
6 7
26,681.60
3,212.48
109.26
Jumlah Harga Bahan 30,003.33
11,027.14
4,618.28
531.71
977.48
Jumlah Upah Tenaga 17,154.61
Jumlah Total 47,157.95
Dibulatkan 47,150
8,233.50
Jumlah Harga Bahan 8,233.50
11,027.14
4,618.28
531.71
977.48
Jumlah Upah Tenaga 17,154.61
Jumlah Total 25,388.11
Dibulatkan 25,380
15,521.00
209.35
Jumlah Harga Bahan 15,730.35
2,940.57
8,081.99
930.50
300.76
Jumlah Upah Tenaga 12,253.82
Jumlah Total 27,984.17
Dibulatkan 27,980
119,160.00
1,046.75
Jumlah Harga Bahan 120,206.75
5,881.14
11,545.70
2-AHSP Hal.390/693
391
SUB TOTAL (Rp) HSP (Rp)
6 7
1,329.28
451.15
Jumlah Upah Tenaga 19,207.27
Jumlah Total 139,414.02
Dibulatkan 139,410
42,088.13
628.05
Jumlah Harga Bahan 42,716.18
6,861.33
11,545.70
1,329.28
526.34
Jumlah Upah Tenaga 20,262.65
Jumlah Total 62,978.82
Dibulatkan 62,970
2-AHSP Hal.391/693
392
SUB TOTAL (Rp) HSP (Rp)
6 7
25,231.75
1,900.03
407.52
1,223.80
342.00
Jumlah Harga Bahan 29,105.10
9,801.90
5,772.85
664.64
751.91
Jumlah Upah Tenaga 16,991.30
Jumlah Total 46,096.40
Dibulatkan 46,090
17,257.24
1,900.03
407.52
1,488.40
342.00
Jumlah Harga Bahan 21,395.19
9,801.90
5,772.85
664.64
751.91
Jumlah Upah Tenaga 16,991.30
Jumlah Total 38,386.49
Dibulatkan 38,380
26,688.48
1,900.03
407.52
1,488.40
342.00
Jumlah Harga Bahan 30,826.43
9,801.90
5,772.85
664.64
751.91
Jumlah Upah Tenaga 16,991.30
Jumlah Total 47,817.73
2-AHSP Hal.392/693
393
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 47,810
628.05
22,834.13
Jumlah Harga Bahan 23,462.18
6,861.33
11,545.70
1,329.28
601.53
Jumlah Upah Tenaga 20,337.84
Jumlah Total 43,800.01
Dibulatkan 43,800
2-AHSP Hal.393/693
394
SUB TOTAL (Rp) HSP (Rp)
6 7
628.05
31,198.88
Jumlah Harga Bahan 31,826.93
6,861.33
11,545.70
1,329.28
601.53
Jumlah Upah Tenaga 20,337.84
Jumlah Total 52,164.76
Dibulatkan 52,160
105,830.00
2,302.85
15,521.00
Jumlah Harga Bahan 123,653.85
17,643.42
36,946.24
4,253.70
1,353.44
Jumlah Upah Tenaga 60,196.79
Jumlah Total 183,850.65
Dibulatkan 183,850
114,649.17
3,349.60
22,164.32
Jumlah Harga Bahan 140,163.10
25,484.94
35,791.67
4,120.77
1,954.97
Jumlah Upah Tenaga 67,352.34
Jumlah Total 207,515.44
Dibulatkan 207,510
34,020.00
509,355.00
375,342.00
5,928.34
2-AHSP Hal.394/693
395
SUB TOTAL (Rp) HSP (Rp)
6 7
778,100.00
909,798.75
605,685.00
14,670.72
44,056.80
12,312.00
Jumlah Harga Bahan 3,289,268.61
917,457.84
1,080,677.52
207,822.60
148,347.65
70,378.78
Jumlah Upah Tenaga 2,424,684.38
Jumlah Total 5,713,953.00
Dibulatkan 5,713,950
2-AHSP Hal.395/693
396
SUB TOTAL (Rp) HSP (Rp)
6 7
947.70
14,169.33
10,430.20
166.06
21,700.00
25,231.75
17,073.00
407.52
1,223.80
342.00
Jumlah Harga Bahan 91,691.36
25,484.94
30,018.82
5,772.85
4,120.77
1,954.97
Jumlah Upah Tenaga 67,352.34
Jumlah Total 159,043.71
Dibulatkan 159,040
947.70
23,787.68
17,106.39
166.06
21,700.00
25,231.75
17,073.00
407.52
1,223.80
342.00
Jumlah Harga Bahan 107,985.90
25,484.94
30,018.82
5,772.85
4,120.77
1,954.97
Jumlah Upah Tenaga 67,352.34
Jumlah Total 175,338.24
Dibulatkan 175,330
947.70
2-AHSP Hal.396/693
397
SUB TOTAL (Rp) HSP (Rp)
6 7
23,787.68
17,106.39
166.06
21,700.00
17,257.24
17,073.00
407.52
1,223.80
342.00
Jumlah Harga Bahan 100,011.39
25,484.94
30,018.82
5,772.85
4,120.77
1,954.97
Jumlah Upah Tenaga 67,352.34
Jumlah Total 167,363.73
Dibulatkan 167,360
2-AHSP Hal.397/693
398
SUB TOTAL (Rp) HSP (Rp)
6 7
947.70
23,787.68
17,106.39
166.06
21,700.00
26,688.48
17,073.00
407.52
1,223.80
342.00
Jumlah Harga Bahan 109,442.63
25,484.94
30,018.82
5,772.85
4,120.77
1,954.97
Jumlah Upah Tenaga 67,352.34
Jumlah Total 176,794.97
Dibulatkan 176,790
43,668.00
1,025.25
2,551.50
119,160.00
Jumlah Harga Bahan 166,404.75
14,702.85
57,728.50
6,646.40
1,127.87
Jumlah Upah Tenaga 80,205.62
Jumlah Total 246,610.37
Dibulatkan 246,610
135,837.50
3,287.20
206,150.00
Jumlah Harga Bahan 345,274.70
34,306.65
5,772.85
4,120.77
2-AHSP Hal.398/693
399
SUB TOTAL (Rp) HSP (Rp)
6 7
1,954.97
Jumlah Upah Tenaga 46,155.23
Jumlah Total 391,429.93
Dibulatkan 391,420
8,721.60
4,519.83
476,190.48
Jumlah Harga Bahan 489,431.90
18,670.29
21,991.81
2,531.96
2,148.31
Jumlah Upah Tenaga 45,342.37
Jumlah Total 534,774.28
Dibulatkan 534,770
2-AHSP Hal.399/693
400
SUB TOTAL (Rp) HSP (Rp)
6 7
246,936.68
2,465.40
Jumlah Harga Bahan 249,402.08
14,702.85
51,955.65
5,981.76
1,203.06
Jumlah Upah Tenaga 73,843.32
Jumlah Total 323,245.39
Dibulatkan 323,240
119,966.00
2,465.40
Jumlah Harga Bahan 122,431.40
14,702.85
51,955.65
5,981.76
1,203.06
Jumlah Upah Tenaga 73,843.32
Jumlah Total 196,274.72
Dibulatkan 196,270
246,936.68
2,465.40
18,153.52
96,522.10
Jumlah Harga Bahan 364,077.70
19,603.80
69,274.20
7,975.68
1,503.82
Jumlah Upah Tenaga 98,357.50
Jumlah Total 462,435.20
Dibulatkan 462,430
119,966.00
2,465.40
2-AHSP Hal.400/693
401
SUB TOTAL (Rp) HSP (Rp)
6 7
18,153.52
96,522.10
Jumlah Harga Bahan 237,107.02
19,603.80
69,274.20
7,975.68
1,503.82
Jumlah Upah Tenaga 98,357.50
Jumlah Total 335,464.52
Dibulatkan 335,460
2-AHSP Hal.401/693
402
SUB TOTAL (Rp) HSP (Rp)
6 7
1,046.75
44,894.00
Jumlah Harga Bahan 45,940.75
2,450.48
8,659.28
996.96
195.50
Jumlah Upah Tenaga 12,302.21
Jumlah Total 58,242.96
Dibulatkan 58,240
1,046.75
24,356.40
Jumlah Harga Bahan 25,403.15
2,450.48
8,659.28
996.96
195.50
Jumlah Upah Tenaga 12,302.21
Jumlah Total 37,705.36
Dibulatkan 37,700
1,046.75
33,278.80
Jumlah Harga Bahan 34,325.55
2,450.48
8,659.28
996.96
195.50
Jumlah Upah Tenaga 12,302.21
Jumlah Total 46,627.76
Dibulatkan 46,620
1,046.75
30,872.00
Jumlah Harga Bahan 31,918.75
2,450.48
8,659.28
2-AHSP Hal.402/693
403
SUB TOTAL (Rp) HSP (Rp)
6 7
996.96
195.50
Jumlah Upah Tenaga 12,302.21
Jumlah Total 44,220.96
Dibulatkan 44,220
2-AHSP Hal.403/693
404
SUB TOTAL (Rp) HSP (Rp)
6 7
34,700.00
11,917.50
1,332.00
12,400.00
57,885.00
4,075.20
7,342.80
19,512.00
1,710.00
Jumlah Harga Bahan 150,874.50
19,603.80
34,637.10
23,091.40
2,255.73
Jumlah Upah Tenaga 79,588.03
Jumlah Total 230,462.53
Dibulatkan 230,460
64,781.25
31,752.00
1,332.00
12,400.00
57,885.00
4,075.20
7,342.80
19,512.00
1,710.00
Jumlah Harga Bahan 200,790.25
19,603.80
34,637.10
23,091.40
2,255.73
Jumlah Upah Tenaga 79,588.03
Jumlah Total 280,378.28
Dibulatkan 280,370
220,479.18
4,930.80
63,881.25
4,075.20
8,930.40
2-AHSP Hal.404/693
405
SUB TOTAL (Rp) HSP (Rp)
6 7
26,016.00
1,710.00
Jumlah Harga Bahan 330,022.83
19,603.80
69,274.20
1,503.82
Jumlah Upah Tenaga 90,381.82
Jumlah Total 420,404.65
Dibulatkan 420,400
2-AHSP Hal.405/693
406
SUB TOTAL (Rp) HSP (Rp)
6 7
38,587.50
19,360.00
1,332.00
12,400.00
51,988.50
4,075.20
8,930.40
19,512.00
1,710.00
Jumlah Harga Bahan 157,895.60
19,603.80
34,637.10
23,091.40
2,255.73
Jumlah Upah Tenaga 79,588.03
Jumlah Total 237,483.63
Dibulatkan 237,480
275,552.00
129,360.40
217,117.20
Jumlah Harga Bahan 622,029.60
161,731.35
28,864.25
3,323.20
12,030.56
Jumlah Upah Tenaga 205,949.36
Jumlah Total 827,978.96
Dibulatkan 827,970
12,640.00
6,468.02
10,980.64
Jumlah Harga Bahan 30,088.66
112,721.85
2,309.14
265.86
902.29
Jumlah Upah Tenaga 116,199.14
2-AHSP Hal.406/693
407
SUB TOTAL (Rp) HSP (Rp)
6 7
316,000.00
129,857.94
173,444.20
Jumlah Harga Bahan 619,302.14
161,731.35
28,864.25
3,323.20
12,030.56
Jumlah Upah Tenaga 205,949.36
Jumlah Total 825,251.50
Dibulatkan 825,250
2-AHSP Hal.407/693
408
SUB TOTAL (Rp) HSP (Rp)
6 7
379,200.00
130,853.02
183,925.72
Jumlah Harga Bahan 693,978.74
161,731.35
28,864.25
3,323.20
12,030.56
Jumlah Upah Tenaga 205,949.36
Jumlah Total 899,928.10
Dibulatkan 899,920
442,400.00
120,653.45
181,430.12
Jumlah Harga Bahan 744,483.57
196,038.00
40,409.95
4,652.48
15,038.20
Jumlah Upah Tenaga 256,138.63
Jumlah Total 1,000,622.20
Dibulatkan 1,000,620
474,000.00
112,195.27
194,656.80
Jumlah Harga Bahan 780,852.07
196,038.00
40,409.95
4,652.48
15,038.20
Jumlah Upah Tenaga 256,138.63
Jumlah Total 1,036,990.70
Dibulatkan 1,036,990
505,600.00
103,737.09
207,883.48
2-AHSP Hal.408/693
409
SUB TOTAL (Rp) HSP (Rp)
6 7
196,038.00
40,409.95
4,652.48
15,038.20
Jumlah Upah Tenaga 256,138.63
Jumlah Total 1,073,359.20
Dibulatkan 1,073,350
2-AHSP Hal.409/693
410
SUB TOTAL (Rp) HSP (Rp)
6 7
537,200.00
109,956.34
202,393.16
Jumlah Harga Bahan 849,549.50
196,038.00
40,409.95
4,652.48
15,038.20
Jumlah Upah Tenaga 256,138.63
Jumlah Total 1,105,688.13
Dibulatkan 1,105,680
568,800.00
114,434.20
197,152.40
Jumlah Harga Bahan 880,386.60
196,038.00
40,409.95
4,652.48
15,038.20
Jumlah Upah Tenaga 256,138.63
Jumlah Total 1,136,525.23
Dibulatkan 1,136,520
171,510.50
77,420.00
99,912.00
162,214.00
Jumlah Harga Bahan 511,056.50
588,114.00
115,457.00
13,292.80
45,114.60
Jumlah Upah Tenaga 761,978.40
Jumlah Total 1,273,034.90
Dibulatkan 1,273,030
10,063.20
270.33
2-AHSP Hal.410/693
411
SUB TOTAL (Rp) HSP (Rp)
6 7
686.13
808.09
93.05
60.15
Jumlah Upah Tenaga 1,647.42
Jumlah Total 11,980.95
Dibulatkan 11,980
9,728.25
270.33
Jumlah Harga Bahan 9,998.58
686.13
808.09
93.05
60.15
Jumlah Upah Tenaga 1,647.42
Jumlah Total 11,646.00
Dibulatkan 11,640
2-AHSP Hal.411/693
412
SUB TOTAL (Rp) HSP (Rp)
6 7
171,380.00
4,930.80
278.00
Jumlah Harga Bahan 176,588.80
50,969.88
30,018.82
3,456.13
3,909.93
Jumlah Upah Tenaga 88,354.76
Jumlah Total 264,943.56
Dibulatkan 264,940
192,802.50
4,930.80
278.00
Jumlah Harga Bahan 198,011.30
50,969.88
30,018.82
3,456.13
3,909.93
Jumlah Upah Tenaga 88,354.76
Jumlah Total 286,366.06
Dibulatkan 286,360
41,468.00
128,535.00
4,930.80
278.00
Jumlah Harga Bahan 175,211.80
50,969.88
30,018.82
3,456.13
3,909.93
Jumlah Upah Tenaga 88,354.76
Jumlah Total 263,566.56
Dibulatkan 263,560
171,380.00
6,574.40
2-AHSP Hal.412/693
413
SUB TOTAL (Rp) HSP (Rp)
6 7
556.00
45,250.01
41,468.00
51,584.00
Jumlah Harga Bahan 316,812.41
64,692.54
38,100.81
4,386.62
4,962.61
Jumlah Upah Tenaga 112,142.58
Jumlah Total 428,954.99
Dibulatkan 428,950
2-AHSP Hal.413/693
414
SUB TOTAL (Rp) HSP (Rp)
6 7
171,380.00
6,574.40
556.00
77,121.00
41,468.00
51,584.00
Jumlah Harga Bahan 348,683.40
64,692.54
38,100.81
4,386.62
4,962.61
Jumlah Upah Tenaga 112,142.58
Jumlah Total 460,825.98
Dibulatkan 460,820
171,380.00
6,574.40
556.00
64,267.50
41,468.00
154,752.00
Jumlah Harga Bahan 438,997.90
64,692.54
38,100.81
4,386.62
4,962.61
Jumlah Upah Tenaga 112,142.58
Jumlah Total 551,140.48
Dibulatkan 551,140
128,535.00
6,574.40
556.00
85,690.00
41,468.00
154,752.00
Jumlah Harga Bahan 417,575.40
64,692.54
38,100.81
4,386.62
2-AHSP Hal.414/693
415
SUB TOTAL (Rp) HSP (Rp)
6 7
4,962.61
Jumlah Upah Tenaga 112,142.58
Jumlah Total 529,717.98
Dibulatkan 529,710
128,535.00
6,574.40
417.00
64,267.50
41,468.00
51,584.00
Jumlah Harga Bahan 292,845.90
64,692.54
38,100.81
4,386.62
4,962.61
Jumlah Upah Tenaga 112,142.58
Jumlah Total 404,988.48
Dibulatkan 404,980
2-AHSP Hal.415/693
416
SUB TOTAL (Rp) HSP (Rp)
6 7
392,076.00
Jumlah Upah Tenaga 392,076.00
Dibulatkan 392,070
902,720.00
Jumlah Harga Bahan 902,720.00
343,066.50
1,212,298.50
139,574.40
26,316.85
Jumlah Upah Tenaga 1,721,256.25
Jumlah Total 2,623,976.25
Dibulatkan 2,623,970
776,320.00
Jumlah Harga Bahan 776,320.00
215,641.80
404,099.50
46,524.80
18,045.84
Jumlah Upah Tenaga 684,311.94
Jumlah Total 1,460,631.94
Dibulatkan 1,460,630
603,333.40
24,654.00
1,112.00
1,509,480.00
40,549.50
424,704.00
134,335.80
202,143.60
Jumlah Harga Bahan 2,940,312.30
519,500.70
31,750.68
150,094.10
121,213.05
34,827.14
39,851.23
2-AHSP Hal.416/693
417
SUB TOTAL (Rp) HSP (Rp)
6 7
2-AHSP Hal.417/693
418
SUB TOTAL (Rp) HSP (Rp)
6 7
814,500.09
32,872.00
1,668.00
2,012,640.00
54,066.00
424,704.00
134,335.80
202,143.60
Jumlah Harga Bahan 3,676,929.49
553,807.35
31,750.68
180,112.92
161,617.40
42,935.74
42,558.11
Jumlah Upah Tenaga 1,012,782.20
Jumlah Total 4,689,711.69
Dibulatkan 4,689,710
1,206,666.80
65,744.00
5,560.00
2,156,400.00
81,099.00
424,704.00
134,335.80
202,143.60
642,675.00
414,680.00
515,840.00
Jumlah Harga Bahan 5,849,848.20
691,033.95
31,750.68
190,504.05
242,426.10
53,569.98
53,084.85
Jumlah Upah Tenaga 1,262,369.61
Jumlah Total 7,112,217.81
Dibulatkan 7,112,210
2-AHSP Hal.418/693
419
SUB TOTAL (Rp) HSP (Rp)
6 7
965,333.44
52,595.20
4,448.00
2,012,640.00
54,066.00
424,704.00
134,335.80
202,143.60
599,830.00
331,744.00
412,672.00
Jumlah Harga Bahan 5,194,512.04
622,420.65
31,750.68
190,504.05
161,617.40
44,265.02
47,821.48
Jumlah Upah Tenaga 1,098,379.28
Jumlah Total 6,292,891.32
Dibulatkan 6,292,890
2-AHSP Hal.419/693
420
SUB TOTAL (Rp) HSP (Rp)
6 7
965,333.44
52,595.20
4,448.00
1,437,600.00
40,549.50
408,272.00
129,360.40
194,656.80
514,140.00
331,744.00
825,344.00
Jumlah Harga Bahan 4,904,043.34
568,510.20
40,409.95
323,279.60
121,213.05
55,829.76
27,820.67
Jumlah Upah Tenaga 1,137,063.23
Jumlah Total 6,041,106.57
Dibulatkan 6,041,100
724,000.08
52,595.20
4,448.00
1,509,480.00
40,549.50
424,704.00
134,335.80
202,143.60
685,520.00
331,744.00
619,008.00
Jumlah Harga Bahan 4,728,528.18
519,500.70
31,750.68
150,094.10
121,213.05
34,827.14
39,851.23
Jumlah Upah Tenaga 897,236.89
Jumlah Total 5,625,765.07
2-AHSP Hal.420/693
421
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 5,625,760
2-AHSP Hal.421/693
422
SUB TOTAL (Rp) HSP (Rp)
6 7
754,166.75
49,308.00
3,336.00
1,916,800.00
54,066.00
408,272.00
129,360.40
194,656.80
449,872.50
296,200.00
361,088.00
Jumlah Harga Bahan 4,617,126.45
548,906.40
40,409.95
265,551.10
161,617.40
53,835.84
30,377.16
Jumlah Upah Tenaga 1,100,697.85
Jumlah Total 5,717,824.30
Dibulatkan 5,717,820
144,800.02
5,916.96
333.60
287,520.00
7,749.46
132,720.00
36,196.04
54,429.04
Jumlah Harga Bahan 669,665.11
113,702.04
12,122.99
36,022.58
23,088.20
8,201.66
6,707.04
Jumlah Upah Tenaga 199,844.50
Jumlah Total 869,509.61
Dibulatkan 869,500
2-AHSP Hal.422/693
423
SUB TOTAL (Rp) HSP (Rp)
6 7
25,707.00
1,972.32
111.20
42,552.96
1,153.41
13,272.00
3,632.04
5,490.32
Jumlah Harga Bahan 93,891.25
20,583.99
12,007.53
3,463.71
1,212.13
1,920.81
942.90
Jumlah Upah Tenaga 40,131.06
Jumlah Total 134,022.31
Dibulatkan 134,020
2-AHSP Hal.423/693
424
SUB TOTAL (Rp) HSP (Rp)
6 7
4,467,333.33 4,467,333.33
Dibulatkan 4,467,330
38,560.50
2,958.48
166.80
62,583.52
1,694.07
19,908.00
5,472.94
8,235.48
Jumlah Harga Bahan 139,579.79
30,738.76
18,011.29
5,033.93
1,823.97
2,863.27
1,413.59
Jumlah Upah Tenaga 59,884.80
Jumlah Total 199,464.59
Dibulatkan 199,460
4,432,444.44 4,432,444.44
Dibulatkan 4,432,440
154,242.00
3,944.64
222.40
140,405.60
3,784.62
35,392.00
9,702.03
14,724.04
Jumlah Harga Bahan 362,417.33
48,774.25
24,015.06
11,268.60
3,232.35
4,434.48
2,436.19
2-AHSP Hal.424/693
425
SUB TOTAL (Rp) HSP (Rp)
6 7
5,707,125.00 5,707,125.00
Dibulatkan 5,707,120
2-AHSP Hal.425/693
426
SUB TOTAL (Rp) HSP (Rp)
6 7
8,569.00
164.36
28,752.00
8,109.90
5,056.00
1,492.62
2,246.04
Jumlah Harga Bahan 54,389.92
17,643.42
2,309.14
2,309.14
2,308.82
797.57
1,353.44
Jumlah Upah Tenaga 26,721.53
Jumlah Total 81,111.45
Dibulatkan 81,110
6,703,305.79 6,703,305.79
Dibulatkan 6,703,300
9,050.00
328.72
42,169.60
1,135.39
9,732.80
2,736.47
3,992.96
Jumlah Harga Bahan 69,145.94
12,477.82
5,426.48
3,463.71
888.90
1,129.89
661.68
Jumlah Upah Tenaga 24,048.47
Jumlah Total 93,194.41
Dibulatkan 93,190
2-AHSP Hal.426/693
427
SUB TOTAL (Rp) HSP (Rp)
6 7
24,133.34
821.80
62,200.16
1,802.20
14,599.20
3,980.32
5,989.44
Jumlah Harga Bahan 113,526.46
24,896.83
14,432.13
5,080.11
1,339.12
2,392.70
1,203.06
Jumlah Upah Tenaga 49,343.93
Jumlah Total 162,870.39
Dibulatkan 162,870
2-AHSP Hal.427/693
428
SUB TOTAL (Rp) HSP (Rp)
6 7
205,656.00
7,889.28
667.20
54,300.01
49,761.60
61,900.80
150,093.00
4,325.28
39,816.00
10,945.88
16,470.96
Jumlah Harga Bahan 601,826.01
63,516.31
45,720.97
12,469.36
3,636.39
7,118.29
3,142.98
Jumlah Upah Tenaga 135,604.31
Jumlah Total 737,430.32
Dibulatkan 737,430
8,193,666.67 8,193,666.67
Dibulatkan 8,193,660
12,853.50
328.72
34,502.40
901.10
6,952.00
2,238.93
3,743.40
Jumlah Harga Bahan 61,520.05
29,111.64
3,810.08
3,810.08
3,809.55
1,329.28
2,255.73
2-AHSP Hal.428/693
429
SUB TOTAL (Rp) HSP (Rp)
6 7
7,042,666.67 7,042,666.67
Dibulatkan 7,042,660
2-AHSP Hal.429/693
430
SUB TOTAL (Rp) HSP (Rp)
6 7
171,380.00
6,574.40
556.00
45,250.01
41,468.00
154,752.00
124,112.80
3,334.07
53,088.00
14,478.41
21,786.59
Jumlah Harga Bahan 636,780.28
63,418.29
38,100.81
10,044.76
4,848.52
6,101.40
3,263.29
Jumlah Upah Tenaga 125,777.07
Jumlah Total 762,557.35
Dibulatkan 762,550
6,354,583.33 6,354,583.33
Dibulatkan 6,354,580
50,000.00
6,574.40
401.00
31,500.00
41,468.00
154,752.00
84,435.04
2,270.77
44,240.00
12,065.35
18,143.01
Jumlah Harga Bahan 445,849.57
56,723.60
38,100.81
6,777.33
4,040.44
2-AHSP Hal.430/693
431
SUB TOTAL (Rp) HSP (Rp)
6 7
5,632.16
2,782.07
Jumlah Upah Tenaga 114,056.39
Jumlah Total 559,905.96
Dibulatkan 559,900
5,599,000.00 5,599,000.00
2-AHSP Hal.431/693
432
SUB TOTAL (Rp) HSP (Rp)
6 7
5,000.00
2,958.48
41,468.00
39,773.60
1,081.32
35,392.00
9,702.03
14,474.48
Jumlah Harga Bahan 149,849.91
34,012.59
19,050.41
3,117.34
3,232.35
2,857.95
1,834.66
Jumlah Upah Tenaga 64,105.30
Jumlah Total 213,955.21
Dibulatkan 213,950
2,674,375.00 2,674,375.00
Dibulatkan 2,674,370
700,434.00
275,570.00
113,833.96
31,231.86
Jumlah Total 1,121,069.82
Dibulatkan 1,121,060
119,073.78
413,355.00
130,090.82
31,231.86
Jumlah Total 693,751.46
Dibulatkan 693,750
180,111.60
551,140.00
195,142.22
62,463.72
Jumlah Total 988,857.54
Dibulatkan 988,850
2-AHSP Hal.432/693
433
SUB TOTAL (Rp) HSP (Rp)
6 7
31,300.00
Jumlah Harga Bahan 31,300.00
14,702.85
8,659.28
1,063.42
1,203.06
Jumlah Upah Tenaga 25,628.61
Jumlah Total 56,928.61
Dibulatkan 56,920
2-AHSP Hal.433/693
434
SUB TOTAL (Rp) HSP (Rp)
6 7
26,184.00
Jumlah Harga Bahan 26,184.00
14,702.85
6,927.42
797.57
1,203.06
Jumlah Upah Tenaga 23,630.89
Jumlah Total 49,814.89
Dibulatkan 49,810
54,250.00
Jumlah Harga Bahan 54,250.00
14,702.85
8,659.28
1,063.42
1,203.06
Jumlah Upah Tenaga 25,628.61
Jumlah Total 79,878.61
Dibulatkan 79,870
73,152.00
Jumlah Harga Bahan 73,152.00
14,702.85
6,927.42
797.57
1,203.06
Jumlah Upah Tenaga 23,630.89
Jumlah Total 96,782.89
Dibulatkan 96,780
99,300.00
Jumlah Harga Bahan 99,300.00
14,702.85
6,927.42
797.57
1,203.06
Jumlah Upah Tenaga 23,630.89
2-AHSP Hal.434/693
435
SUB TOTAL (Rp) HSP (Rp)
6 7
63,250.00
493.08
Jumlah Harga Bahan 63,743.08
19,603.80
11,545.70
1,329.28
1,503.82
Jumlah Upah Tenaga 33,982.60
Jumlah Total 97,725.68
Dibulatkan 97,720
2-AHSP Hal.435/693
436
SUB TOTAL (Rp) HSP (Rp)
6 7
139,281.00
3,287.20
Jumlah Harga Bahan 142,568.20
19,603.80
11,545.70
1,329.28
150.38
Jumlah Upah Tenaga 32,629.16
Jumlah Total 175,197.36
Dibulatkan 175,190
30,641.50
4,960.00
Jumlah Harga Bahan 35,601.50
13,722.66
8,659.28
1,063.42
1,203.06
Jumlah Upah Tenaga 24,648.42
Jumlah Total 60,249.92
Dibulatkan 60,240
38,286.00
4,960.00
Jumlah Harga Bahan 43,246.00
13,722.66
8,659.28
1,063.42
1,203.06
Jumlah Upah Tenaga 24,648.42
Jumlah Total 67,894.42
Dibulatkan 67,890
29,370.00
4,960.00
Jumlah Harga Bahan 34,330.00
13,722.66
8,081.99
2-AHSP Hal.436/693
437
SUB TOTAL (Rp) HSP (Rp)
6 7
930.50
1,052.67
Jumlah Upah Tenaga 23,787.82
Jumlah Bahan & Tenaga 58,117.82
Dibulatkan 58,110
36,819.75
4,960.00
Jumlah Harga Bahan 41,779.75
13,722.66
8,081.99
930.50
1,052.67
Jumlah Upah Tenaga 23,787.82
Jumlah Total 65,567.57
Dibulatkan 65,560
2-AHSP Hal.437/693
438
SUB TOTAL (Rp) HSP (Rp)
6 7
31,479.00
418.70
Jumlah Harga Bahan 31,897.70
11,762.28
6,927.42
797.57
902.29
Jumlah Upah Tenaga 20,389.56
Jumlah Total 52,287.26
Dibulatkan 52,280
90,961.20
4,540.00
Jumlah Harga Bahan 95,501.20
7,841.52
9,236.56
1,329.28
1,503.82
Jumlah Upah Tenaga 19,911.18
Jumlah Total 115,412.38
Dibulatkan 115,410
36,384.48
4,540.00
Jumlah Harga Bahan 40,924.48
3,136.61
3,694.62
531.71
601.53
Jumlah Upah Tenaga 7,964.47
Jumlah Total 48,888.95
Dibulatkan 48,880
44,652.00
821.80
Jumlah Harga Bahan 45,473.80
13,722.66
8,081.99
2-AHSP Hal.438/693
439
SUB TOTAL (Rp) HSP (Rp)
6 7
930.50
1,052.67
Jumlah Upah Tenaga 23,787.82
Jumlah Total 69,261.62
Dibulatkan 69,260
21,115.50
Jumlah Harga Bahan 21,115.50
14,702.85
5,772.85
664.64
1,203.06
Jumlah Upah Tenaga 22,343.40
Jumlah Total 43,458.90
Dibulatkan 43,450
2-AHSP Hal.439/693
440
SUB TOTAL (Rp) HSP (Rp)
6 7
27,720.00
Jumlah Harga Bahan 27,720.00
14,702.85
5,772.85
664.64
1,203.06
Jumlah Upah Tenaga 22,343.40
Jumlah Total 50,063.40
Dibulatkan 50,060
22,475.00
10,112.00
7,992.96
Jumlah Harga Bahan 40,579.96
39,207.60
23,091.40
2,658.56
300.76
Jumlah Upah Tenaga 65,258.32
Jumlah Total 105,838.28
Dibulatkan 105,830
25,800.00
12,134.40
9,591.55
Jumlah Harga Bahan 47,525.95
39,207.60
23,091.40
2,658.56
300.76
Jumlah Upah Tenaga 65,258.32
Jumlah Total 112,784.28
Dibulatkan 112,780
46,732.00
12,134.40
9,591.55
Jumlah Harga Bahan 68,457.95
2-AHSP Hal.440/693
441
SUB TOTAL (Rp) HSP (Rp)
6 7
39,207.60
23,091.40
2,658.56
300.76
Jumlah Upah Tenaga 65,258.32
Jumlah Total 133,716.28
Dibulatkan 133,710
53,760.00
12,134.40
9,591.55
Jumlah Harga Bahan 75,485.95
39,207.60
23,091.40
2,658.56
300.76
Jumlah Upah Tenaga 65,258.32
Jumlah Total 140,744.28
Dibulatkan 140,740
2-AHSP Hal.441/693
442
SUB TOTAL (Rp) HSP (Rp)
6 7
44,450.00
821.80
13,651.20
7,992.96
12,430.00
Jumlah Harga Bahan 79,345.96
39,207.60
23,091.40
2,658.56
300.76
Jumlah Upah Tenaga 65,258.32
Jumlah Total 144,604.28
Dibulatkan 144,600
36,666.30
1,046.75
Jumlah Harga Bahan 37,713.05
24,504.75
17,318.55
1,993.92
1,954.97
Jumlah Upah Tenaga 45,772.19
Jumlah Total 83,485.24
Dibulatkan 83,480
53,295.00
1,046.75
Jumlah Harga Bahan 54,341.75
24,504.75
17,318.55
1,993.92
1,954.97
Jumlah Upah Tenaga 45,772.19
Jumlah Total 100,113.94
Dibulatkan 100,110
116,712.00
7,440.00
Jumlah Harga Bahan 124,152.00
2-AHSP Hal.442/693
443
SUB TOTAL (Rp) HSP (Rp)
6 7
8,233.60
14,432.13
1,728.06
601.53
Jumlah Upah Tenaga 24,995.31
Jumlah Total 149,147.31
Dibulatkan 149,140
32,808.00
7,440.00
Jumlah Harga Bahan 40,248.00
8,233.60
14,432.13
1,728.06
601.53
Jumlah Upah Tenaga 24,995.31
Jumlah Total 65,243.31
Dibulatkan 65,240
2-AHSP Hal.443/693
444
SUB TOTAL (Rp) HSP (Rp)
6 7
75,768.00
7,440.00
Jumlah Harga Bahan 83,208.00
9,801.90
17,318.55
1,728.06
601.53
Jumlah Upah Tenaga 29,450.04
Jumlah Total 112,658.04
Dibulatkan 112,650
13,491.00
837.40
Jumlah Harga Bahan 14,328.40
14,702.85
8,081.99
1,063.42
902.29
Jumlah Upah Tenaga 24,750.56
Jumlah Total 39,078.96
Dibulatkan 39,070
33,110.00
2,850.00
Jumlah Harga Bahan 35,960.00
8,233.60
14,432.13
1,728.06
601.53
Jumlah Upah Tenaga 24,995.31
Jumlah Total 60,955.31
Dibulatkan 60,950
78,826.00
45.40
Jumlah Harga Bahan 78,871.40
14,702.85
8,081.99
2-AHSP Hal.444/693
445
SUB TOTAL (Rp) HSP (Rp)
6 7
1,063.42
902.29
Jumlah Upah Tenaga 24,750.56
Jumlah Total 103,621.96
Dibulatkan 103,620
56,985.50
45.40
Jumlah Harga Bahan 57,030.90
14,702.85
8,081.99
1,063.42
902.29
Jumlah Upah Tenaga 24,750.56
Jumlah Total 81,781.46
Dibulatkan 81,780
2-AHSP Hal.445/693
446
SUB TOTAL (Rp) HSP (Rp)
6 7
104,879.25
95,130.00
11,160.00
Jumlah Harga Bahan 211,169.25
49,009.50
57,720.50
6,646.40
375.96
Jumlah Upah Tenaga 113,752.36
Jumlah Total 324,921.61
Dibulatkan 324,920
723,905.00
43,434.30
Jumlah Harga Bahan 767,339.30
323,462.70
127,002.70
132.93
24,061.12
Jumlah Upah Tenaga 474,659.45
Jumlah Total 1,241,998.75
Dibulatkan 1,241,990
1,173,402.00
70,404.12
Jumlah Harga Bahan 1,243,806.12
323,462.70
127,002.70
132.93
24,061.12
Jumlah Upah Tenaga 474,659.45
Jumlah Total 1,718,465.57
Dibulatkan 1,718,460
1,884,986.00
113,099.16
Jumlah Harga Bahan 1,998,085.16
2-AHSP Hal.446/693
447
SUB TOTAL (Rp) HSP (Rp)
6 7
323,462.70
127,002.70
132.93
24,061.12
Jumlah Upah Tenaga 474,659.45
Jumlah Total 2,472,744.61
Dibulatkan 2,472,740
81,220.00
7,584.00
2,497.80
Jumlah Harga Bahan 91,301.80
98,019.00
173,185.50
19,939.20
24,061.12
Jumlah Upah Tenaga 315,204.82
Jumlah Total 406,506.62
Dibulatkan 406,500
2-AHSP Hal.447/693
448
SUB TOTAL (Rp) HSP (Rp)
6 7
242,550.00
7,584.00
2,497.80
Jumlah Harga Bahan 252,631.80
98,019.00
173,185.50
19,939.20
24,061.12
Jumlah Upah Tenaga 315,204.82
Jumlah Total 567,836.62
Dibulatkan 567,830
308,315.00
7,584.00
2,497.80
Jumlah Harga Bahan 318,396.80
98,019.00
173,185.50
19,939.20
24,061.12
Jumlah Upah Tenaga 315,204.82
Jumlah Total 633,601.62
Dibulatkan 633,600
1,739,526.00
521,857.80
7,584.00
2,497.80
Jumlah Harga Bahan 2,271,465.60
98,019.00
115,457.00
13,292.80
15,038.20
Jumlah Upah Tenaga 241,807.00
Jumlah Total 2,513,272.60
Dibulatkan 2,513,270
579,352.00
173,805.60
2-AHSP Hal.448/693
449
SUB TOTAL (Rp) HSP (Rp)
6 7
7,584.00
2,497.80
Jumlah Harga Bahan 763,239.40
98,019.00
115,457.00
13,292.80
15,038.20
Jumlah Upah Tenaga 241,807.00
Jumlah Total 1,005,046.40
Dibulatkan 1,005,040
2-AHSP Hal.449/693
450
SUB TOTAL (Rp) HSP (Rp)
6 7
1,633,386.00
196,006.32
7,584.00
2,497.80
Jumlah Harga Bahan 1,839,474.12
117,622.80
167,412.65
19,939.20
15,038.20
Jumlah Upah Tenaga 320,012.85
Jumlah Total 2,159,486.97
Dibulatkan 2,159,480
205,840.00
37,051.20
Jumlah Harga Bahan 242,891.20
176,434.20
311,733.90
71,781.12
16,542.02
Jumlah Upah Tenaga 576,491.24
Jumlah Total 819,382.44
Dibulatkan 819,380
122,936.00
151,680.00
74,934.00
334,400.00
74,580.00
Jumlah Harga Bahan 758,530.00
588,114.00
346,371.00
39,878.40
45,114.60
Jumlah Upah Tenaga 1,019,478.00
Jumlah Total 1,778,008.00
Dibulatkan 1,778,000
36,576.00
2-AHSP Hal.450/693
451
SUB TOTAL (Rp) HSP (Rp)
6 7
50,635.84
22,480.20
206,720.00
50,714.40
Jumlah Harga Bahan 367,126.44
192,117.24
153,557.81
17,679.42
14,587.05
Jumlah Upah Tenaga 377,941.53
Jumlah Total 745,067.97
Dibulatkan 745,060
2-AHSP Hal.451/693
452
SUB TOTAL (Rp) HSP (Rp)
6 7
22,356.00
7,824.60
Jumlah Harga Bahan 30,180.60
5,293.03
8,821.71
1,196.35
406.03
Jumlah Upah Tenaga 15,717.12
Jumlah Total 45,897.72
Dibulatkan 45,890
31,416.00
10,995.60
Jumlah Harga Bahan 42,411.60
5,293.03
8,821.71
1,196.35
406.03
Jumlah Upah Tenaga 15,717.12
Jumlah Total 58,128.72
Dibulatkan 58,120
43,400.40
15,190.14
Jumlah Harga Bahan 58,590.54
5,293.03
8,821.71
1,196.35
406.03
Jumlah Upah Tenaga 15,717.12
Jumlah Total 74,307.66
Dibulatkan 74,300
53,322.00
18,662.70
Jumlah Harga Bahan 71,984.70
5,293.03
8,821.71
2-AHSP Hal.452/693
453
SUB TOTAL (Rp) HSP (Rp)
6 7
1,196.35
406.03
Jumlah Upah Tenaga 15,717.12
Jumlah Total 87,701.82
Dibulatkan 87,700
59,778.00
20,922.30
Jumlah Harga Bahan 80,700.30
10,586.05
17,643.42
2,392.70
812.06
Jumlah Upah Tenaga 31,434.24
Jumlah Total 112,134.54
Dibulatkan 112,130
2-AHSP Hal.453/693
454
SUB TOTAL (Rp) HSP (Rp)
6 7
83,058.00
29,070.30
Jumlah Harga Bahan 112,128.30
10,586.05
17,643.42
2,392.70
812.06
Jumlah Upah Tenaga 31,434.24
Jumlah Total 143,562.54
Dibulatkan 143,560
139,424.40
48,798.54
Jumlah Harga Bahan 188,222.94
10,586.05
17,643.42
2,392.70
812.06
Jumlah Upah Tenaga 31,434.24
Jumlah Total 219,657.18
Dibulatkan 219,650
229,640.40
80,374.14
Jumlah Harga Bahan 310,014.54
10,586.05
17,643.42
2,392.70
812.06
Jumlah Upah Tenaga 31,434.24
Jumlah Total 341,448.78
Dibulatkan 341,440
316,368.00
110,728.80
Jumlah Harga Bahan 427,096.80
13,232.57
22,054.28
2-AHSP Hal.454/693
455
SUB TOTAL (Rp) HSP (Rp)
6 7
2,990.88
1,022.60
Jumlah Upah Tenaga 39,300.32
Jumlah Total 466,397.12
Dibulatkan 466,390
7,200.00
2,520.00
Jumlah Harga Bahan 9,720.00
3,528.68
5,881.14
797.57
270.69
Jumlah Upah Tenaga 10,478.08
Jumlah Total 20,198.08
Dibulatkan 20,190
2-AHSP Hal.455/693
456
SUB TOTAL (Rp) HSP (Rp)
6 7
9,124.80
3,193.68
Jumlah Harga Bahan 12,318.48
3,528.68
5,881.14
797.57
270.69
Jumlah Upah Tenaga 10,478.08
Jumlah Total 22,796.56
Dibulatkan 22,790
12,240.00
4,284.00
Jumlah Harga Bahan 16,524.00
3,528.68
5,881.14
797.57
270.69
Jumlah Upah Tenaga 10,478.08
Jumlah Total 27,002.08
Dibulatkan 27,000
17,541.60
6,139.56
Jumlah Harga Bahan 23,681.16
3,528.68
5,881.14
797.57
270.69
Jumlah Upah Tenaga 10,478.08
Jumlah Total 34,159.24
Dibulatkan 34,150
9,489.60
3,321.36
Jumlah Harga Bahan 12,810.96
3,528.68
5,881.14
2-AHSP Hal.456/693
457
SUB TOTAL (Rp) HSP (Rp)
6 7
797.57
270.69
Jumlah Upah Tenaga 10,478.08
Jumlah Total 23,289.04
Dibulatkan 23,280
21,607.20
7,562.52
Jumlah Harga Bahan 29,169.72
3,528.68
5,881.14
797.57
270.69
Jumlah Upah Tenaga 10,478.08
Jumlah Total 39,647.80
Dibulatkan 39,640
2-AHSP Hal.457/693
458
SUB TOTAL (Rp) HSP (Rp)
6 7
8,767.20
3,068.52
Jumlah Harga Bahan 11,835.72
3,528.68
5,881.14
797.57
270.69
Jumlah Upah Tenaga 10,478.08
Jumlah Total 22,313.80
Dibulatkan 22,310
27,590.40
9,656.64
Jumlah Harga Bahan 37,247.04
5,293.03
8,821.71
1,196.35
406.03
Jumlah Upah Tenaga 15,717.12
Jumlah Total 52,964.16
Dibulatkan 52,960
13,951.20
4,882.92
Jumlah Harga Bahan 18,834.12
5,293.03
8,821.71
1,196.35
406.03
Jumlah Upah Tenaga 15,717.12
Jumlah Total 34,551.24
Dibulatkan 34,550
37,788.00
13,225.80
Jumlah Harga Bahan 51,013.80
3,528.68
5,881.14
2-AHSP Hal.458/693
459
SUB TOTAL (Rp) HSP (Rp)
6 7
797.57
27.07
Jumlah Upah Tenaga 10,234.46
Jumlah Total 61,248.26
Dibulatkan 61,240
19,620.00
6,867.00
Jumlah Harga Bahan 26,487.00
3,528.68
5,881.14
797.57
27.07
Jumlah Upah Tenaga 10,234.46
Jumlah Total 36,721.46
Dibulatkan 36,720
2-AHSP Hal.459/693
460
SUB TOTAL (Rp) HSP (Rp)
6 7
53,064.00
18,572.40
Jumlah Harga Bahan 71,636.40
7,939.54
13,232.57
1,794.53
616.57
Jumlah Upah Tenaga 23,583.20
Jumlah Total 95,219.60
Dibulatkan 95,210
23,606.40
8,262.24
Jumlah Harga Bahan 31,868.64
7,939.54
13,232.57
1,794.53
616.57
Jumlah Upah Tenaga 23,583.20
Jumlah Total 55,451.84
Dibulatkan 55,450
91,084.80
31,879.68
Jumlah Harga Bahan 122,964.48
7,939.54
13,232.57
1,794.53
616.57
Jumlah Upah Tenaga 23,583.20
Jumlah Total 146,547.68
Dibulatkan 146,540
38,608.80
13,513.08
Jumlah Harga Bahan 52,121.88
7,939.54
13,232.57
2-AHSP Hal.460/693
461
SUB TOTAL (Rp) HSP (Rp)
6 7
1,794.53
616.57
Jumlah Upah Tenaga 23,583.20
Jumlah Total 75,705.08
Dibulatkan 75,700
211,360.80
73,976.28
Jumlah Harga Bahan 285,337.08
7,939.54
13,232.57
1,794.53
616.57
Jumlah Upah Tenaga 23,583.20
Jumlah Total 308,920.28
Dibulatkan 308,920
2-AHSP Hal.461/693
462
SUB TOTAL (Rp) HSP (Rp)
6 7
73,068.00
25,573.80
Jumlah Harga Bahan 98,641.80
7,939.54
13,232.57
1,794.53
616.57
Jumlah Upah Tenaga 23,583.20
Jumlah Total 122,225.00
Dibulatkan 122,220
223,370.00
114,110.00
Jumlah Harga Bahan 337,480.00
2,940.57
34,637.10
3,987.84
225.57
Jumlah Upah Tenaga 41,791.08
Jumlah Total 379,271.08
Dibulatkan 379,270
40,831.00
93.38
Jumlah Harga Bahan 40,924.38
980.19
9,801.90
1,329.28
751.91
Jumlah Upah Tenaga 12,863.28
Jumlah Total 53,787.66
Dibulatkan 53,780
215,390.00
93.38
Jumlah Harga Bahan 215,483.38
980.19
9,801.90
2-AHSP Hal.462/693
463
SUB TOTAL (Rp) HSP (Rp)
6 7
1,329.28
751.91
Jumlah Upah Tenaga 12,863.28
Jumlah Total 228,346.66
Dibulatkan 228,340
528,760.00
93.38
Jumlah Harga Bahan 528,853.38
980.19
9,801.90
1,329.28
751.91
Jumlah Upah Tenaga 12,863.28
Jumlah Total 541,716.66
Dibulatkan 541,710
2-AHSP Hal.463/693
464
SUB TOTAL (Rp) HSP (Rp)
6 7
287,220.00
93.38
Jumlah Harga Bahan 287,313.38
980.19
9,801.90
1,329.28
751.91
Jumlah Upah Tenaga 12,863.28
Jumlah Total 300,176.66
Dibulatkan 300,170
261,110.00
93.38
Jumlah Harga Bahan 261,203.38
980.19
9,801.90
1,329.28
751.91
Jumlah Upah Tenaga 12,863.28
Jumlah Total 274,066.66
Dibulatkan 274,060
95,000.00
93.38
Jumlah Harga Bahan 95,093.38
980.19
9,801.90
1,329.28
751.91
Jumlah Upah Tenaga 12,863.28
Jumlah Total 107,956.66
Dibulatkan 107,950
66,710.00
Jumlah Harga Bahan 66,710.00
980.19
11,545.70
2-AHSP Hal.464/693
465
SUB TOTAL (Rp) HSP (Rp)
6 7
1,329.28
751.91
Jumlah Upah Tenaga 14,607.08
Jumlah Total 81,317.08
Dibulatkan 81,310
33,075.00
Jumlah Harga Bahan 33,075.00
980.19
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 14,607.08
Jumlah Total 47,682.08
Dibulatkan 47,680
2-AHSP Hal.465/693
466
SUB TOTAL (Rp) HSP (Rp)
6 7
32,523.00
Jumlah Harga Bahan 32,523.00
980.19
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 14,607.08
Jumlah Total 47,130.08
Dibulatkan 47,130
230,975.00
Jumlah Harga Bahan 230,975.00
980.19
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 14,607.08
Jumlah Total 245,582.08
Dibulatkan 245,580
162,000.00
Jumlah Harga Bahan 162,000.00
980.19
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 14,607.08
Jumlah Total 176,607.08
Dibulatkan 176,600
75,250.00
Jumlah Harga Bahan 75,250.00
980.19
11,545.70
1,329.28
751.91
2-AHSP Hal.466/693
467
SUB TOTAL (Rp) HSP (Rp)
6 7
73,760.00
Jumlah Harga Bahan 73,760.00
980.19
11,545.70
1,329.28
751.91
Jumlah Upah Tenaga 14,607.08
Jumlah Total 88,367.08
Dibulatkan 88,360
2-AHSP Hal.467/693
468
SUB TOTAL (Rp) HSP (Rp)
6 7
106,456.00
139,512.00
3,858,750.00
1,436,651.30
Jumlah Harga Bahan 5,541,369.30
309,936.08
227,404.08
30,839.30
23,775.39
Jumlah Upah Tenaga 591,954.85
Jumlah Total 6,133,324.15
Dibulatkan 6,133,320
224,028.00
159,478.88
109,653.42
32,442.80
109,640.96
2,955.61
23,135.61
26,362.84
21,116.67
79,974.00
11,669.56
11,626.00
54,695.80
23,212.63
Jumlah Harga Bahan 889,992.77
533,223.36
251,811.72
31,366.08
33,232.00
45,941.70
Jumlah Upah Tenaga 895,574.86
Jumlah Total 1,785,567.63
Dibulatkan 1,785,560
366,776.00
385,343.04
147,120.42
49,912.00
2-AHSP Hal.468/693
469
SUB TOTAL (Rp) HSP (Rp)
6 7
298,733.28
8,019.79
33,335.18
34,321.43
128,811.68
94,784.00
15,121.12
34,878.00
54,695.80
31,350.83
Jumlah Harga Bahan 1,683,202.57
847,668.31
402,483.10
49,009.50
53,038.27
72,484.12
Jumlah Upah Tenaga 1,424,683.31
Jumlah Total 3,107,885.88
Dibulatkan 3,107,880
2-AHSP Hal.469/693
470
SUB TOTAL (Rp) HSP (Rp)
6 7
195,580.00
205,134.56
78,430.92
26,702.92
159,036.90
4,271.21
17,911.44
18,404.24
69,383.34
50,472.48
8,053.64
18,601.60
29,278.34
16,757.98
Jumlah Harga Bahan 898,019.57
451,279.48
214,288.19
26,171.07
28,313.66
38,648.17
Jumlah Upah Tenaga 758,700.58
Jumlah Total 1,656,720.15
Dibulatkan 1,656,720
143,614.70
5,921.32
64,348.00
Jumlah Harga Bahan 213,884.02
102,919.95
26,465.13
3,589.06
14,572.02
Jumlah Upah Tenaga 147,546.15
Jumlah Total 361,430.17
Dibulatkan 361,430
3,555,560.00
33,024.60
219,403.80
Jumlah Harga Bahan 3,807,988.40
2-AHSP Hal.470/693
471
SUB TOTAL (Rp) HSP (Rp)
6 7
117,622.80
82,710.10
Jumlah Upah Tenaga 200,332.90
Jumlah Total 4,008,321.30
Dibulatkan 4,008,320
8,268,750.00
37,214.23
413,675.32
Jumlah Harga Bahan 8,719,639.56
117,622.80
82,710.10
Jumlah Upah Tenaga 200,332.90
Jumlah Total 8,919,972.46
Dibulatkan 8,919,970
2-AHSP Hal.471/693
472
SUB TOTAL (Rp) HSP (Rp)
6 7
18,388.50
Jumlah Harga Bahan 18,388.50
5,881.14
6,927.42
797.57
451.15
Jumlah Upah Tenaga 14,057.27
Jumlah Total 32,445.77
Dibulatkan 32,440
12,413.10
Jumlah Harga Bahan 12,413.10
5,881.14
6,927.42
797.57
451.15
Jumlah Upah Tenaga 14,057.27
Jumlah Total 26,470.37
Dibulatkan 26,470
11,873.40
562.28
4,244.62
377.61
22.77
33.92
68.31
74.65
Jumlah Harga Bahan 17,257.55
1,960.38
2,308.82
1,052.67
Jumlah Upah Buat 5,321.87
1,725.76
980.19
577.21
300.76
Jumlah Upah Erection 3,583.91
2-AHSP Hal.472/693
473
SUB TOTAL (Rp) HSP (Rp)
6 7
2-AHSP Hal.473/693
474
SUB TOTAL (Rp) HSP (Rp)
6 7
12,593.90
562.28
4,244.62
377.61
22.77
33.92
68.31
74.65
Jumlah Harga Bahan 17,978.05
1,960.38
2,308.82
1,052.67
Jumlah Upah Buat 5,321.87
1,797.81
980.19
577.21
300.76
Jumlah Upah Erection 3,655.96
Jumlah Total 26,955.89
Dibulatkan 26,950
14,949.00
562.28
4,244.62
377.61
22.77
33.92
68.31
1,026.00
Jumlah Harga Bahan 21,284.51
1,960.38
2,308.82
1,052.67
Jumlah Upah Buat 5,321.87
2,128.45
980.19
577.21
300.76
Jumlah Upah Erection 3,986.61
Jumlah Total 30,592.99
2-AHSP Hal.474/693
475
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 30,590
995.32
135.00
125.14
Jumlah Harga Bahan 1,255.46
392.08
230.91
26.59
30.08
Jumlah Upah Tenaga 679.65
1,275.00 1,275.00
Jumlah Total 3,210.11
Dibulatkan 3,210
2-AHSP Hal.475/693
476
SUB TOTAL (Rp) HSP (Rp)
6 7
171,735.00
445,752.00
1,244.15
Jumlah Harga Bahan 618,731.15
102,919.95
121,213.05
13,957.44
7,819.86
Jumlah Upah Tenaga 245,910.30
Jumlah Total 864,641.45
Dibulatkan 864,640
6,069.00
14,516.13
64,200.00
Jumlah Harga Bahan 6,069.00
63,712.35
75,036.65
8,640.32
4,812.22
Jumlah Upah Tenaga 152,201.54
Jumlah Total 158,270.54
Dibulatkan 158,270
300,000.00
16,195.00
5,000.00
2,800.00
Jumlah Total 323,995
Dibulatkan 323,990
452,030.00
Jumlah Harga Bahan 452,030.00
43,128.36
50,794.04
5,848.83
3,308.40
Jumlah Upah Tenaga 103,079.64
Jumlah Total 555,109.64
Dibulatkan 555,100
2-AHSP Hal.476/693
477
SUB TOTAL (Rp) HSP (Rp)
6 7
350,600.00
Jumlah Harga Bahan 350,600.00
117,622.80
138,529.20
15,951.36
902.29
Jumlah Upah Tenaga 273,005.65
Jumlah Total 623,605.65
Dibulatkan 623,600
2-AHSP Hal.477/693
478
SUB TOTAL (Rp) HSP (Rp)
6 7
127,677.00
2,590.00
2,365.20
Jumlah Harga Bahan 132,632.20
4,214.82
4,963.96
571.59
315.80
Jumlah Upah Tenaga 10,066.17
Jumlah Total 142,698.37
Dibulatkan 142,690
99,363.00
2,590.00
2,365.20
Jumlah Harga Bahan 104,318.20
4,214.82
4,963.96
571.59
315.80
Jumlah Upah Tenaga 10,066.17
Jumlah Total 114,384.37
Dibulatkan 114,380
397,452.00
100,243.50
10,643.40
Jumlah Harga Bahan 508,338.90
8,331.62
9,813.85
1,063.42
601.53
Jumlah Upah Tenaga 19,810.41
Jumlah Total 528,149.31
Dibulatkan 528,140.00
32,934.00
214,200.00
10,643.40
2-AHSP Hal.478/693
479
SUB TOTAL (Rp) HSP (Rp)
6 7
8,331.62
9,813.85
1,063.42
601.53
Jumlah Upah Tenaga 19,810.41
Jumlah Total 277,587.81
Dibulatkan 277,580.00
2-AHSP Hal.479/693
480
SUB TOTAL (Rp) HSP (Rp)
6 7
58,180.68
86,926.80
Jumlah Harga Bahan 145,107.48
163,691.73
192,813.19
22,198.98
12,481.71
Jumlah Upah Tenaga 391,185.60
Jumlah Total 536,293.08
Dibulatkan 536,290
144,112.02
418.70
73,558.80
Jumlah Harga Bahan 218,089.52
19,603.80
23,091.40
2,658.56
150.38
Jumlah Upah Tenaga 45,504.14
Jumlah Total 263,593.66
Dibulatkan 263,590
30,470.00
314.03
172,092.50
6,971.25
Jumlah Harga Bahan 209,847.78
19,603.80
46,182.80
3,323.20
1,503.82
Jumlah Upah Tenaga 70,613.62
Jumlah Total 280,461.40
Dibulatkan 280,460
30,470.00
314.03
2-AHSP Hal.480/693
481
SUB TOTAL (Rp) HSP (Rp)
6 7
172,092.50
8,365.50
Jumlah Harga Bahan 211,242.03
3,920.76
46,182.80
3,323.20
187.98
Jumlah Upah Tenaga 53,614.74
Jumlah Total 264,856.76
Dibulatkan 264,850
2-AHSP Hal.481/693
482
SUB TOTAL (Rp) HSP (Rp)
6 7
30,470.00
209.35
5,653.00
Jumlah Harga Bahan 36,332.35
14,702.85
34,637.10
3,987.84
1,052.67
Jumlah Upah Tenaga 54,380.46
Jumlah Total 90,712.81
Dibulatkan 90,710
7,500.00
Jumlah Harga Bahan 7,500.00
367.57
4,329.64
498.48
28.20
Jumlah Upah Tenaga 5,223.89
Jumlah Total 12,723.89
Dibulatkan 12,720
6,840.00
Jumlah Harga Bahan 6,840.00
367.57
4,329.64
498.48
28.20
Jumlah Upah Tenaga 5,223.89
Jumlah Total 12,063.89
Dibulatkan 12,060
31,430.00
Jumlah Harga Bahan 31,430.00
735.14
8,659.28
996.96
2-AHSP Hal.482/693
483
SUB TOTAL (Rp) HSP (Rp)
6 7
56.39
Jumlah Upah Tenaga 10,447.77
Jumlah Total 41,877.77
Dibulatkan 41,870
77,737.50
99,225.00
32,390.00
75,000.00
20,000.00
Jumlah 304,353
Dibulatkan 304,350
2-AHSP Hal.483/693
484
SUB TOTAL (Rp) HSP (Rp)
6 7
253,577.00
Jumlah Harga Bahan 253,577.00
5,881.14
69,274.20
7,975.68
451.15
Jumlah Upah Tenaga 83,582.17
Jumlah Total 337,159.17
Dibulatkan 337,150
49,102.00
Jumlah Harga Bahan 49,102.00
980.19
57,728.50
1,329.28
75.19
Jumlah Upah Tenaga 60,113.16
Jumlah Total 109,215.16
Dibulatkan 109,210
145,804.00
Jumlah Harga Bahan 145,804.00
980.19
57,728.50
1,329.28
75.19
Jumlah Upah Tenaga 60,113.16
Jumlah Total 205,917.16
Dibulatkan 205,910
88,598.00
Jumlah Harga Bahan 88,598.00
490.10
57,728.50
664.64
37.60
Jumlah Upah Tenaga 58,920.83
Jumlah Total 147,518.83
2-AHSP Hal.484/693
485
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 147,510
79,325.00
Jumlah Harga Bahan 79,325.00
490.10
57,728.50
664.64
37.60
Jumlah Upah Tenaga 58,920.83
Jumlah Total 138,245.83
Dibulatkan 138,240
2-AHSP Hal.485/693
486
SUB TOTAL (Rp) HSP (Rp)
6 7
75,300.00
Jumlah Harga Bahan 75,300.00
2,450.48
28,864.25
3,323.20
195.50
Jumlah Upah Tenaga 34,833.42
Jumlah Total 110,133.42
Dibulatkan 110,130
56,944.00
Jumlah Harga Bahan 56,944.00
2,450.48
28,864.25
3,323.20
195.50
Jumlah Upah Tenaga 34,833.42
Jumlah Total 91,777.42
Dibulatkan 91,770
28,886.00
Jumlah Harga Bahan 28,886.00
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 49,781.54
Dibulatkan 49,780
55,346.00
Jumlah Harga Bahan 55,346.00
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 76,241.54
2-AHSP Hal.486/693
487
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 76,240
24,073.00
Jumlah Harga Bahan 24,073.00
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 44,968.54
Dibulatkan 44,960
2-AHSP Hal.487/693
488
SUB TOTAL (Rp) HSP (Rp)
6 7
22,050.00
Jumlah Harga Bahan 22,050.00
1,960.38
23,091.40
2,658.56
150.38
Jumlah Upah Tenaga 27,860.72
Jumlah Total 49,910.72
Dibulatkan 49,910
1,929,380.00
Jumlah Harga Bahan 1,929,380.00
4,900.95
57,728.50
6,646.40
375.96
Jumlah Upah Tenaga 69,651.81
Jumlah Total 1,999,031.81
Dibulatkan 1,999,030
1,653,750.00
Jumlah Harga Bahan 1,653,750.00
1,960.38
23,091.40
2,658.56
150.38
Jumlah Upah Tenaga 27,860.72
Jumlah Total 1,681,610.72
Dibulatkan 1,681,610
29,220.00
Jumlah Harga Bahan 29,220.00
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 50,115.54
2-AHSP Hal.488/693
489
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 50,110
33,320.00
Jumlah Harga Bahan 33,320.00
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 54,215.54
Dibulatkan 54,210
2-AHSP Hal.489/693
490
SUB TOTAL (Rp) HSP (Rp)
6 7
286,190.00
Jumlah Harga Bahan 286,190.00
4,900.95
57,728.50
6,646.40
375.96
Jumlah Upah Tenaga 69,651.81
Jumlah Total 355,841.81
Dibulatkan 355,840
21,225.00
Jumlah Harga Bahan 21,225.00
1,960.38
23,091.40
2,658.56
150.38
Jumlah Upah Tenaga 27,860.72
Jumlah Total 49,085.72
Dibulatkan 49,080
27,933.00
Jumlah Harga Bahan 27,933.00
1,960.38
23,091.40
2,658.56
150.38
Jumlah Upah Tenaga 27,860.72
Jumlah Total 55,793.72
Dibulatkan 55,790
117,970.00
Jumlah Harga Bahan 117,970.00
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 138,865.54
2-AHSP Hal.490/693
491
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 138,860
21,225.00
Jumlah Harga Bahan 21,225.00
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 42,120.54
Dibulatkan 42,120
2-AHSP Hal.491/693
492
SUB TOTAL (Rp) HSP (Rp)
6 7
213,115.00
Jumlah Harga Bahan 213,115.00
4,900.95
57,728.50
6,646.40
375.96
Jumlah Upah Tenaga 69,651.81
Jumlah Total 282,766.81
Dibulatkan 282,760
43,660.00
Jumlah Harga Bahan 43,660.00
980.19
11,545.70
1,329.28
75.19
Jumlah Upah Tenaga 13,930.36
Jumlah Total 57,590.36
Dibulatkan 57,590
253,210.00
Jumlah Harga Bahan 253,210.00
5,881.14
69,274.20
7,975.68
451.15
Jumlah Upah Tenaga 83,582.17
Jumlah Total 336,792.17
Dibulatkan 336,790
87,928.50
Jumlah Harga Bahan 87,928.50
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 108,824.04
2-AHSP Hal.492/693
493
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 108,820
105,017.00
Jumlah Harga Bahan 105,017.00
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 125,912.54
Dibulatkan 125,910
2-AHSP Hal.493/693
494
SUB TOTAL (Rp) HSP (Rp)
6 7
127,336.00
Jumlah Harga Bahan 127,336.00
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 148,231.54
Dibulatkan 148,230
132,347.60
Jumlah Harga Bahan 132,347.60
1,470.29
17,318.55
1,993.92
112.79
Jumlah Upah Tenaga 20,895.54
Jumlah Total 153,243.14
Dibulatkan 153,240
224,400.00
Jumlah Harga Bahan 224,400.00
1,617.31
19,050.41
2,193.31
120.31
Jumlah Upah Tenaga 22,981.34
Jumlah Total 247,381.34
Dibulatkan 247,380
227,392.00
Jumlah Harga Bahan 227,392.00
1,617.31
19,050.41
2,193.31
120.31
Jumlah Upah Tenaga 22,981.34
Jumlah Total 250,373.34
2-AHSP Hal.494/693
495
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 250,370
293,026.80
Jumlah Harga Bahan 293,026.80
1,617.31
19,050.41
2,193.31
120.31
Jumlah Upah Tenaga 22,981.34
Jumlah Total 316,008.14
Dibulatkan 316,000
2-AHSP Hal.495/693
496
SUB TOTAL (Rp) HSP (Rp)
6 7
1,000,516.00
Jumlah Harga Bahan 1,000,516.00
1,617.31
19,050.41
2,193.31
120.31
Jumlah Upah Tenaga 22,981.34
Jumlah Total 1,023,497.34
Dibulatkan 1,023,490
1,667,534.00
Jumlah Harga Bahan 1,667,534.00
2,450.48
28,864.25
3,323.20
187.98
Jumlah Upah Tenaga 34,825.90
Jumlah Total 1,702,359.90
Dibulatkan 1,702,350
627,599.50
Jumlah Harga Bahan 627,599.50
2,450.48
28,864.25
3,323.20
187.98
Jumlah Upah Tenaga 34,825.90
Jumlah Total 662,425.40
Dibulatkan 662,420
513,298.50
Jumlah Harga Bahan 513,298.50
2,450.48
28,864.25
3,323.20
187.98
Jumlah Upah Tenaga 34,825.90
Jumlah Total 548,124.40
Dibulatkan 548,120
2-AHSP Hal.496/693
497
SUB TOTAL (Rp) HSP (Rp)
6 7
378,834.50
Jumlah Harga Bahan 378,834.50
2,450.48
28,864.25
3,323.20
187.98
Jumlah Upah Tenaga 34,825.90
Jumlah Total 413,660.40
Dibulatkan 413,660
206,167.50
Jumlah Harga Bahan 206,167.50
1,470.29
17,318.55
1,993.92
120.31
Jumlah Upah Tenaga 20,903.06
Jumlah Total 227,070.56
Dibulatkan 227,070
2-AHSP Hal.497/693
498
SUB TOTAL (Rp) HSP (Rp)
6 7
1,465,907.30
Jumlah Harga Bahan 1,465,907.30
1,470.29
17,318.55
1,993.92
120.31
Jumlah Upah Tenaga 20,903.06
Jumlah Total 1,486,810.36
Dibulatkan 1,486,810
258,768.90
12,387.20
11,240.10
16,159.00
Jumlah Harga Bahan 298,555.20
24,504.75
13,854.84
1,595.14
1,954.97
Jumlah Upah Tenaga 41,909.69
Jumlah Total 340,464.89
Dibulatkan 340,460
114,036.00
12,387.20
11,240.10
16,159.00
Jumlah Harga Bahan 153,822.30
24,504.75
13,854.84
1,595.14
1,954.97
Jumlah Upah Tenaga 41,909.69
Jumlah Total 195,731.99
Dibulatkan 195,730.00
48,564.75
2-AHSP Hal.498/693
499
SUB TOTAL (Rp) HSP (Rp)
6 7
12,387.20
11,240.10
16,159.00
Jumlah Harga Bahan 88,351.05
24,504.75
13,854.84
1,595.14
1,954.97
Jumlah Upah Tenaga 41,909.69
Jumlah Total 130,260.74
Dibulatkan 130,260.00
2-AHSP Hal.499/693
500
SUB TOTAL (Rp) HSP (Rp)
6 7
218,289.30
12,640.00
11,240.10
18,645.00
Jumlah Harga Bahan 260,814.40
25,484.94
14,432.13
1,728.06
1,954.97
Jumlah Upah Tenaga 43,600.10
Jumlah Total 304,414.50
Dibulatkan 304,410
137,816.00
12,640.00
11,240.10
18,645.00
Jumlah Harga Bahan 180,341.10
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
Jumlah Total 290,686.77
Dibulatkan 290,680
66,412.65
12,640.00
11,240.10
18,645.00
Jumlah Harga Bahan 108,937.75
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
Jumlah Total 219,283.42
Dibulatkan 219,280
2-AHSP Hal.500/693
501
SUB TOTAL (Rp) HSP (Rp)
6 7
41,996.06
12,640.00
11,240.10
18,645.00
Jumlah Harga Bahan 84,521.16
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
Jumlah Total 194,866.83
Dibulatkan 194,860
2-AHSP Hal.501/693
502
SUB TOTAL (Rp) HSP (Rp)
6 7
80,560.00
13,145.60
11,240.10
20,136.60
Jumlah Harga Bahan 125,082.30
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
Jumlah Total 235,427.97
Dibulatkan 235,420
54,855.00
13,145.60
11,240.10
20,136.60
Jumlah Harga Bahan 99,377.30
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
Jumlah Total 209,722.97
Dibulatkan 209,720
39,750.00
10,352.16
11,240.10
34,182.50
Jumlah Harga Bahan 95,524.76
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
Jumlah Total 205,870.43
Dibulatkan 205,870
2-AHSP Hal.502/693
503
SUB TOTAL (Rp) HSP (Rp)
6 7
31,800.00
10,352.16
11,240.10
34,182.50
Jumlah Harga Bahan 87,574.76
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
Jumlah Total 197,920.43
Dibulatkan 197,920
2-AHSP Hal.503/693
504
SUB TOTAL (Rp) HSP (Rp)
6 7
249,979.80
10,352.16
11,240.10
8,079.50
Jumlah Harga Bahan 279,651.56
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
Jumlah Total 389,997.23
Dibulatkan 389,990
391,686.75
22,441.20
Jumlah Harga Bahan 414,127.95
63,712.35
40,409.95
4,652.48
4,887.42
Jumlah Upah Tenaga 113,662.20
Jumlah Total 527,790.15
Dibulatkan 527,790
66,175.25
13,090.70
Jumlah Harga Bahan 79,265.95
14,702.85
17,318.55
1,993.92
1,203.06
Jumlah Upah Tenaga 35,218.38
Jumlah Total 114,484.33
Dibulatkan 114,480
14,250.00
Jumlah Harga Bahan 14,250.00
11,762.28
2-AHSP Hal.504/693
505
SUB TOTAL (Rp) HSP (Rp)
6 7
13,854.84
1,595.14
902.29
Jumlah Upah Tenaga 28,114.55
Jumlah Total 42,364.55
Dibulatkan 42,360
240,546.60
2,480.00
15,724.16
6,244.50
8,079.50
Jumlah Harga Bahan 273,074.76
70,573.68
75,047.05
8,640.32
5,263.37
Jumlah Upah Tenaga 159,524.42
Jumlah Total 432,599.18
Dibulatkan 432,590
2-AHSP Hal.505/693
506
SUB TOTAL (Rp) HSP (Rp)
6 7
80,560.00
11,755.20
4,496.04
24,114.20
Jumlah Harga Bahan 120,925.44
58,811.40
51,955.65
5,981.76
4,511.46
Jumlah Upah Tenaga 121,260.27
Jumlah Total 242,185.71
Dibulatkan 242,180
54,855.00
11,755.20
4,496.04
24,114.20
Jumlah Harga Bahan 95,220.44
58,811.40
51,955.65
5,981.76
4,511.46
Jumlah Upah Tenaga 121,260.27
Jumlah Total 216,480.71
Dibulatkan 216,480
86,602.00
11,755.20
4,496.04
24,114.20
Jumlah Harga Bahan 126,967.44
58,811.40
51,955.65
5,981.76
4,511.46
Jumlah Upah Tenaga 121,260.27
Jumlah Total 248,227.71
Dibulatkan 248,220
2-AHSP Hal.506/693
507
SUB TOTAL (Rp) HSP (Rp)
6 7
49,883.60
11,755.20
4,496.04
24,114.20
Jumlah Harga Bahan 90,249.04
58,811.40
51,955.65
5,981.76
4,511.46
Jumlah Upah Tenaga 121,260.27
Jumlah Total 211,509.31
Dibulatkan 211,500
2-AHSP Hal.507/693
508
SUB TOTAL (Rp) HSP (Rp)
6 7
107,342.40
14,852.00
8,742.30
Jumlah Harga Bahan 130,936.70
60,771.78
40,409.95
4,652.48
45,114.60
Jumlah Upah Tenaga 150,948.81
Jumlah Total 281,885.51
Dibulatkan 281,880
104,793.70
14,852.00
8,742.30
Jumlah Harga Bahan 128,388.00
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
Jumlah Total 238,733.67
Dibulatkan 238,730
23,706.50
1,440.96
749.34
1,243.00
Jumlah Harga Bahan 27,139.80
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 48,300.90
Dibulatkan 48,300
23,850.00
1,440.96
2-AHSP Hal.508/693
509
SUB TOTAL (Rp) HSP (Rp)
6 7
749.34
1,243.00
Jumlah Harga Bahan 27,283.30
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 48,444.40
Dibulatkan 48,440
2-AHSP Hal.509/693
510
SUB TOTAL (Rp) HSP (Rp)
6 7
24,127.55
1,440.96
749.34
1,243.00
Jumlah Harga Bahan 27,560.85
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 48,721.95
Dibulatkan 48,720
30,687.00
1,440.96
749.34
1,243.00
Jumlah Harga Bahan 34,120.30
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 55,281.40
Dibulatkan 55,280
22,768.50
1,440.96
749.34
1,243.00
Jumlah Harga Bahan 26,201.80
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 47,362.90
Dibulatkan 47,360
2-AHSP Hal.510/693
511
SUB TOTAL (Rp) HSP (Rp)
6 7
11,347.30
1,440.96
749.34
1,243.00
Jumlah Harga Bahan 14,780.60
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 35,941.70
Dibulatkan 35,940
2-AHSP Hal.511/693
512
SUB TOTAL (Rp) HSP (Rp)
6 7
11,585.46
1,440.96
749.34
1,243.00
Jumlah Harga Bahan 15,018.76
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 36,179.86
Dibulatkan 36,170
16,069.60
1,440.96
749.34
310.75
Jumlah Harga Bahan 18,570.65
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 39,731.75
Dibulatkan 39,730
22,983.33
1,440.96
749.34
310.75
Jumlah Harga Bahan 25,484.38
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 46,645.49
Dibulatkan 46,640
2-AHSP Hal.512/693
513
SUB TOTAL (Rp) HSP (Rp)
6 7
4,664.00
720.48
374.67
161.59
Jumlah Harga Bahan 5,920.74
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 27,081.84
Dibulatkan 27,080
2-AHSP Hal.513/693
514
SUB TOTAL (Rp) HSP (Rp)
6 7
3,286.00
720.48
374.67
161.59
Jumlah Harga Bahan 4,542.74
8,821.71
10,391.13
1,196.35
751.91
Jumlah Upah Tenaga 21,161.10
Jumlah Total 25,703.84
Dibulatkan 25,700
44,042.40
515.71
224.80
96.48
Jumlah Harga Bahan 44,879.39
4,900.95
11,545.70
1,329.28
375.96
Jumlah Upah Tenaga 18,151.89
Jumlah Total 63,031.28
Dibulatkan 63,030
19,512.50
2,992.16
Jumlah Harga Bahan 22,504.66
7,841.52
9,236.56
1,063.42
601.53
Jumlah Upah Tenaga 18,743.03
Jumlah Total 41,247.69
Dibulatkan 41,240
135,000.00
863.65
2-AHSP Hal.514/693
515
SUB TOTAL (Rp) HSP (Rp)
6 7
11,762.28
13,854.84
1,595.14
902.29
Jumlah Upah Tenaga 28,114.55
Jumlah Total 163,978.20
Dibulatkan 163,970
2-AHSP Hal.515/693
516
SUB TOTAL (Rp) HSP (Rp)
6 7
14,702.85
375.96
Jumlah Upah Tenaga 15,078.81
Jumlah Total 15,078.81
Dibulatkan 15,070
1,774.40
402.40
342.00
Jumlah Harga Bahan 2,518.80
3,920.76
4,618.28
531.71
375.96
Jumlah Upah Tenaga 9,446.71
Jumlah Total 11,965.51
Dibulatkan 11,960
3,387.75
6,482.27
6,826.35
1,710.00
4,024.00
393.05
Jumlah Harga Bahan 22,823.42
6,861.33
8,659.28
996.96
375.96
Jumlah Upah Tenaga 16,893.52
Jumlah Total 39,716.94
Dibulatkan 39,710
3,387.75
6,482.27
6,826.35
1,710.00
4,024.00
393.05
2-AHSP Hal.516/693
517
SUB TOTAL (Rp) HSP (Rp)
6 7
6,861.33
8,659.28
996.96
375.96
Jumlah Upah Tenaga 16,893.52
Jumlah Total 39,716.94
Dibulatkan 39,710
2-AHSP Hal.517/693
518
SUB TOTAL (Rp) HSP (Rp)
6 7
5,437.00
3,387.75
6,482.27
10,440.30
1,710.00
4,024.00
393.05
Jumlah Harga Bahan 31,874.37
6,861.33
10,391.13
797.57
375.96
Jumlah Upah Tenaga 18,425.98
Jumlah Total 50,300.35
Dibulatkan 50,300
5,437.00
3,387.75
6,482.27
10,440.30
1,710.00
4,024.00
393.05
Jumlah Harga Bahan 31,874.37
6,861.33
10,391.13
797.57
375.96
Jumlah Upah Tenaga 18,425.98
Jumlah Total 50,300.35
Dibulatkan 50,300
5,437.00
3,387.75
6,482.27
14,054.25
1,710.00
6,036.00
393.05
Jumlah Harga Bahan 37,500.32
2-AHSP Hal.518/693
519
SUB TOTAL (Rp) HSP (Rp)
6 7
6,861.33
12,122.99
531.71
375.96
Jumlah Upah Tenaga 19,891.98
Jumlah Total 57,392.30
Dibulatkan 57,390
2-AHSP Hal.519/693
520
SUB TOTAL (Rp) HSP (Rp)
6 7
5,437.00
3,387.75
6,482.27
14,054.25
1,710.00
6,036.00
393.05
Jumlah Harga Bahan 37,500.32
6,861.33
12,122.99
531.71
375.96
Jumlah Upah Tenaga 19,891.98
Jumlah Total 57,392.30
Dibulatkan 57,390
7,031.40
14,662.38
6,840.00
393.05
Jumlah Harga Bahan 28,926.83
6,927.42
2,126.85
375.96
Jumlah Upah Tenaga 9,430.22
Jumlah Total 38,357.05
Dibulatkan 38,350
5,948.40
12,933.00
2,012.00
1,710.00
393.05
Jumlah Harga Bahan 22,996.45
24,504.75
32,327.96
5,317.12
3,007.64
Jumlah Upah Tenaga 65,157.47
Jumlah Total 88,153.92
2-AHSP Hal.520/693
521
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 88,150
7,435.50
15,050.00
11,907.50
13,060.20
11,847.50
2,052.00
0.00
Jumlah Harga Bahan 61,352.70
69,274.20
7,975.68
Jumlah Upah Tenaga 77,249.88
Jumlah Total 138,602.58
Dibulatkan 138,600
2-AHSP Hal.521/693
522
SUB TOTAL (Rp) HSP (Rp)
6 7
3,569.04
7,740.00
5,953.75
8,706.80
5,923.75
1,368.00
0.00
Jumlah Harga Bahan 33,261.34
34,637.10
3,987.84
Jumlah Upah Tenaga 38,624.94
Jumlah Bahan & Tenaga 71,886.28
Dibulatkan 71,880
701.75
393.05
Jumlah Harga Bahan 1,094.80
9,801.90
902.29
Jumlah Upah Tenaga 10,704.19
Jumlah Total 11,798.99
Dibulatkan 11,790
2,538.75
1,109.00
342.00
78.61
Jumlah Harga Bahan 4,068.36
15,683.04
18,473.12
2,126.85
375.96
Jumlah Upah Tenaga 36,658.96
Jumlah Total 40,727.32
Dibulatkan 40,720
2,308.60
3,813.10
10,440.30
2-AHSP Hal.522/693
523
SUB TOTAL (Rp) HSP (Rp)
6 7
1,026.00
248.15
Jumlah Harga Bahan 17,836.15
1,960.38
7,273.79
837.45
375.96
Jumlah Upah Tenaga 10,447.57
Jumlah Total 28,283.72
Dibulatkan 28,280
2-AHSP Hal.523/693
524
SUB TOTAL (Rp) HSP (Rp)
6 7
2,308.60
3,813.10
10,440.30
1,026.00
248.15
Jumlah Harga Bahan 17,836.15
1,960.38
7,273.79
837.45
375.96
Jumlah Upah Tenaga 10,447.57
Jumlah Total 28,283.72
Dibulatkan 28,280
3,610.20
3,813.10
10,440.30
1,026.00
248.15
Jumlah Harga Bahan 19,137.75
1,960.38
7,273.79
837.45
375.96
Jumlah Upah Tenaga 10,447.57
Jumlah Total 29,585.32
Dibulatkan 29,580
3,610.20
26,733.60
1,026.00
248.15
Jumlah Harga Bahan 31,617.95
1,960.38
7,273.79
837.45
375.96
Jumlah Upah Tenaga 10,447.57
Jumlah Total 42,065.52
Dibulatkan 42,060
2-AHSP Hal.524/693
525
SUB TOTAL (Rp) HSP (Rp)
6 7
4,575.72
7,227.90
1,026.00
248.15
Jumlah Harga Bahan 13,077.77
2,744.53
4,849.19
558.30
375.96
Jumlah Upah Tenaga 8,527.98
Jumlah Total 21,605.74
Dibulatkan 21,600
2-AHSP Hal.525/693
526
SUB TOTAL (Rp) HSP (Rp)
6 7
1,971.60
2,957.40
1,026.00
248.15
Jumlah Harga Bahan 6,203.15
2,744.53
4,849.19
558.30
375.96
Jumlah Upah Tenaga 8,527.98
Jumlah Total 14,731.12
Dibulatkan 14,730
4,575.72
7,227.90
1,026.00
248.15
Jumlah Harga Bahan 13,077.77
2,744.53
4,849.19
558.30
375.96
Jumlah Upah Tenaga 8,527.98
Jumlah Total 21,605.74
Dibulatkan 21,600
6,714.60
6,841.26
Jumlah Harga Bahan 13,555.86
2,744.53
4,849.19
558.30
375.96
Jumlah Upah Tenaga 8,527.98
Jumlah Total 22,083.84
Dibulatkan 22,080
12,025.80
2-AHSP Hal.526/693
527
SUB TOTAL (Rp) HSP (Rp)
6 7
1,960.38
7,273.79
837.45
375.96
Jumlah Upah Tenaga 10,447.57
Jumlah Total 22,473.37
Dibulatkan 22,470
2-AHSP Hal.527/693
528
SUB TOTAL (Rp) HSP (Rp)
6 7
2,788.50
78.61
1,368.00
Jumlah Harga Bahan 4,235.11
1,960.38
23,091.40
2,658.56
150.38
Jumlah Upah Tenaga 27,860.72
Jumlah Total 32,095.83
Dibulatkan 32,090
2,718.50
78.61
6,033.33
1,368.00
Jumlah Harga Bahan 10,198.44
24,504.75
25,977.83
2,990.88
1,127.87
Jumlah Upah Tenaga 54,601.32
Jumlah Total 64,799.76
Dibulatkan 64,790
12,352.20
2,012.00
1,368.00
235.83
Jumlah Harga Bahan 15,968.03
6,861.33
10,391.13
797.57
375.96
Jumlah Upah Tenaga 18,425.98
Jumlah Total 34,394.01
Dibulatkan 34,390
2,788.50
2-AHSP Hal.528/693
529
SUB TOTAL (Rp) HSP (Rp)
6 7
6,482.27
10,440.30
3,018.00
1,368.00
393.05
Jumlah Harga Bahan 24,490.12
6,861.33
10,391.13
797.57
375.96
Jumlah Upah Tenaga 18,425.98
Jumlah Total 42,916.10
Dibulatkan 42,910
2-AHSP Hal.529/693
530
SUB TOTAL (Rp) HSP (Rp)
6 7
2,788.50
9,619.79
17,579.12
3,018.00
1,368.00
393.05
Jumlah Harga Bahan 34,766.46
6,861.33
10,391.13
797.57
375.96
Jumlah Upah Tenaga 18,425.98
Jumlah Total 53,192.44
Dibulatkan 53,190
41,682.00
45,760.00
20,675.00
11,847.50
3,420.00
2,467.69
5,510.00
Jumlah Harga Bahan 131,362.19
34,306.65
46,182.80
13,292.80
5,263.37
Jumlah Upah Tenaga 99,045.62
Jumlah Total 230,407.81
Dibulatkan 230,400
38,250.00
1,572.20
Jumlah Harga Bahan 39,822.20
1,960.38
7,273.79
837.45
375.96
Jumlah Upah Tenaga 10,447.57
Jumlah Total 50,269.77
2-AHSP Hal.530/693
531
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 50,260
6,796.25
196.53
1,368.00
Jumlah Harga Bahan 8,360.78
1,960.38
23,091.40
2,658.56
150.38
Jumlah Upah Tenaga 27,860.72
Jumlah Total 36,221.50
Dibulatkan 36,220
2-AHSP Hal.531/693
532
SUB TOTAL (Rp) HSP (Rp)
6 7
48,000.00
4,800.00
Jumlah Harga Bahan 52,800.00
19,603.80
17,318.55
1,993.92
1,503.82
Jumlah Upah Tenaga 40,420.09
Jumlah Total 93,220.09
Dibulatkan 93,220
14,250.00
Jumlah Harga Bahan 14,250.00
11,762.28
13,854.84
1,595.14
902.29
Jumlah Upah Tenaga 28,114.55
Jumlah Total 42,364.55
Dibulatkan 42,360
12,800.00
1,250.00
1,965.25
632.00
19,603.80
23,091.40
2,658.56
1,503.82 63,504.83
Dibulatkan 63,500.00
427.50
4,341.05
62.89
5,881.14
8,659.28
2-AHSP Hal.532/693
533
SUB TOTAL (Rp) HSP (Rp)
6 7
996.96
571.45
1,500.00 22,440.26
Dibulatkan 22,440.00
9,279.00
1,368.00
3,067.35
3,554.25
235.83
1,960.38 29,214.16
23,091.40
2,658.56
1,503.82 46,718.59
Dibulatkan 46,710.00
2-AHSP Hal.533/693
534
SUB TOTAL (Rp) HSP (Rp)
6 7
653,492.67
50,077.21
Jumlah Upah Tenaga 703,569.88
Jumlah Total 703,569.88
Dibulatkan 703,560
65,378.67
4,962.61
Jumlah Upah Tenaga 70,341.28
Jumlah Total 70,341.28
Dibulatkan 70,340
7,155.39
541.38
Jumlah Upah Tenaga 7,696.76
Jumlah Total 7,696.76
Dibulatkan 7,690
78,415.20
6,015.28
Jumlah Upah Tenaga 84,430.48
Jumlah Total 84,430.48
Dibulatkan 84,430
147,028.50
11,278.65
Jumlah Upah Tenaga 158,307.15
Jumlah Total 158,307.15
Dibulatkan 158,300
294,057.00
22,557.30
Jumlah Upah Tenaga 316,614.30
Jumlah Total 316,614.30
Dibulatkan 316,610
4,900.95
751.91
2-AHSP Hal.534/693
535
SUB TOTAL (Rp) HSP (Rp)
6 7
4,900.95
751.91
Jumlah Upah Tenaga 5,652.86
Jumlah Total 5,652.86
Dibulatkan 5,650
4,900.95
375.96
Jumlah Upah Tenaga 5,276.91
Jumlah Total 5,276.91
Dibulatkan 5,270
2-AHSP Hal.535/693
536
SUB TOTAL (Rp) HSP (Rp)
6 7
1,960.38
1,503.82
Jumlah Upah Tenaga 3,464.20
Jumlah Total 3,464.20
Dibulatkan 3,460
2,940.57
2,255.73
Jumlah Upah Tenaga 5,196.30
Jumlah Total 5,196.30
Dibulatkan 5,190
4,900.95
3,759.55
Jumlah Upah Tenaga 8,660.50
Jumlah Total 8,660.50
Dibulatkan 8,660
9,801.90
2,886.43
332.32
751.91
Jumlah Upah Tenaga 13,772.56
Jumlah Total 13,772.56
Dibulatkan 13,770
9,801.90
751.91
Jumlah Upah Tenaga 10,553.81
Jumlah Total 10,553.81
Dibulatkan 10,550
261,318.65
461,828.00
53,171.20
20,000.81
Jumlah Upah Tenaga 796,318.66
Jumlah Total 796,318.66
Dibulatkan 796,310
2-AHSP Hal.536/693
537
SUB TOTAL (Rp) HSP (Rp)
6 7
461,828.00
53,171.20
Jumlah Upah Tenaga 514,999.20
Jumlah Total 514,999.20
Dibulatkan 514,990
9,801.90
751.91
Jumlah Upah Tenaga 10,553.81
Jumlah Total 10,553.81
Dibulatkan 10,550
3,463.71
398.78
Jumlah Upah Tenaga 3,862.49
Jumlah Total 3,862.49
Dibulatkan 3,860
2-AHSP Hal.537/693
538
SUB TOTAL (Rp) HSP (Rp)
6 7
112,020.00
98,400.00
2,800.00
2,510.00
6,780.00
15,570.00
7,470.00
3,095.00
6,332.00
9,840.00
Jumlah Harga Bahan 264,817.00
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 321,653.98
Dibulatkan 321,650
75,300.00
98,400.00
2,800.00
2,510.00
6,780.00
15,570.00
7,470.00
3,095.00
6,332.00
9,840.00
Jumlah Harga Bahan 228,097.00
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 284,933.98
Dibulatkan 284,930
2-AHSP Hal.538/693
539
SUB TOTAL (Rp) HSP (Rp)
6 7
63,100.00
98,400.00
2,800.00
2,510.00
6,780.00
15,570.00
7,470.00
3,095.00
6,332.00
9,840.00
Jumlah Harga Bahan 215,897.00
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 272,733.98
Dibulatkan 272,730
2-AHSP Hal.539/693
540
SUB TOTAL (Rp) HSP (Rp)
6 7
112,020.00
98,400.00
2,800.00
2,510.00
13,560.00
31,140.00
7,470.00
3,095.00
6,332.00
9,840.00
Jumlah Harga Bahan 287,167.00
79,756.80
29,405.70
4,511.46
Jumlah Upah Tenaga 113,673.96
Jumlah Total 400,840.96
Dibulatkan 400,840
574,200.00
39,360.00
29,853.00
59,034.00
4,972.50
76,200.00
Jumlah Harga Bahan 783,619.50
106,342.40
39,207.60
6,015.28
Jumlah Upah Tenaga 151,565.28
Jumlah Total 935,184.78
Dibulatkan 935,180.00
104,130.00
Jumlah Harga Bahan 104,130.00
13,292.80
1,503.82
Jumlah Upah Tenaga 14,796.62
2-AHSP Hal.540/693
541
SUB TOTAL (Rp) HSP (Rp)
6 7
39,473.00
Jumlah Harga Bahan 39,473.00
13,292.80
1,503.82
Jumlah Upah Tenaga 14,796.62
Jumlah Total 54,269.62
Dibulatkan 54,260
2-AHSP Hal.541/693
542
SUB TOTAL (Rp) HSP (Rp)
6 7
394,730.00
7,470.00
Jumlah Harga Bahan 402,200.00
39,878.40
4,511.46
Jumlah Upah Tenaga 44,389.86
Jumlah Total 446,589.86
Dibulatkan 446,580
1,207,220.00
7,470.00
Jumlah Harga Bahan 1,214,690.00
39,878.40
4,511.46
Jumlah Upah Tenaga 44,389.86
Jumlah Total 1,259,079.86
Dibulatkan 1,259,070
112,020.00
7,470.00
Jumlah Harga Bahan 119,490.00
39,878.40
4,511.46
Jumlah Upah Tenaga 44,389.86
Jumlah Total 163,879.86
Dibulatkan 163,870
112,020.00
98,400.00
2,800.00
2,510.00
6,780.00
15,570.00
7,470.00
6,190.00
9,840.00
Jumlah Harga Bahan 261,580.00
2-AHSP Hal.542/693
543
SUB TOTAL (Rp) HSP (Rp)
6 7
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 318,416.98
Dibulatkan 318,410.00
2-AHSP Hal.543/693
544
SUB TOTAL (Rp) HSP (Rp)
6 7
252,144.00
118,080.00
2,800.00
2,510.00
2,260.00
15,570.00
49,800.00
9,285.00
393,600.00
11,808.00
Jumlah Harga Bahan 857,857.00
66,464.00
24,504.75
3,759.55
Jumlah Upah Tenaga 94,728.30
Jumlah Total 952,585.30
Dibulatkan 952,580
112,020.00
98,400.00
88,200.00
2,800.00
2,510.00
6,780.00
15,570.00
7,470.00
6,190.00
9,840.00
Jumlah Harga Bahan 349,780.00
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 406,616.98
Dibulatkan 406,610
2-AHSP Hal.544/693
545
SUB TOTAL (Rp) HSP (Rp)
6 7
121,600.00
196,800.00
2,510.00
11,300.00
24,220.00
4,860.00
52,360.00
19,680.00
Jumlah Harga Bahan 433,330.00
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 490,166.98
Dibulatkan 490,160
2-AHSP Hal.545/693
546
SUB TOTAL (Rp) HSP (Rp)
6 7
1,013,800.00
55,120.00
1,378,130.00
157,110.00
77,200.00
72,334.00
963,792.90
Jumlah Harga Bahan 3,717,486.90
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 3,774,323.88
Dibulatkan 3,774,320
48,800.00
196,800.00
2,510.00
11,300.00
24,220.00
6,190.00
19,680.00
Jumlah Harga Bahan 309,500.00
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 366,336.98
Dibulatkan 366,330
29,280.00
118,080.00
2,510.00
6,780.00
15,570.00
6,190.00
11,808.00
Jumlah Harga Bahan 190,218.00
2-AHSP Hal.546/693
547
SUB TOTAL (Rp) HSP (Rp)
6 7
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 247,054.98
Dibulatkan 247,050
2-AHSP Hal.547/693
548
SUB TOTAL (Rp) HSP (Rp)
6 7
210,120.00
336,060.00
393,600.00
31,420.00
484,220.00
11,200.00
22,600.00
46,710.00
29,880.00
6,332.00
39,360.00
Jumlah Harga Bahan 1,611,502.00
106,342.40
39,207.60
6,015.28
Jumlah Upah Tenaga 151,565.28
Jumlah Total 1,763,067.28
Dibulatkan 1,763,060
210,120.00
336,060.00
393,600.00
31,420.00
584,780.00
11,200.00
22,600.00
46,710.00
29,880.00
6,332.00
39,360.00
Jumlah Harga Bahan 1,712,062.00
106,342.40
39,207.60
6,015.28
Jumlah Upah Tenaga 151,565.28
Jumlah Total 1,863,627.28
Dibulatkan 1,863,620
89,150.00
2-AHSP Hal.548/693
549
SUB TOTAL (Rp) HSP (Rp)
6 7
29,520.00
5,190.00
2,490.00
2,952.00
Jumlah Harga Bahan 129,302.00
26,585.60
9,801.90
1,503.82
Jumlah Upah Tenaga 37,891.32
Jumlah Total 167,193.32
Dibulatkan 167,190
2-AHSP Hal.549/693
550
SUB TOTAL (Rp) HSP (Rp)
6 7
111,780.00
27,560.00
608,280.00
52,090.00
799.71
Jumlah Harga Bahan 688,729.71
26,585.60
9,801.90
1,503.82
Jumlah Upah Tenaga 37,891.32
Jumlah Total 726,621.03
Dibulatkan 726,620
51,830.00
518.30
Jumlah Harga Bahan 52,348.30
13,292.80
4,900.95
Jumlah Upah Tenaga 18,193.75
Jumlah Total 70,542.05
Dibulatkan 70,540
199,555.00
1,995.55
Jumlah Harga Bahan 201,550.55
13,292.80
4,900.95
Jumlah Upah Tenaga 18,193.75
Jumlah Total 219,744.30
Dibulatkan 219,740
146,630.00
1,466.30
Jumlah Harga Bahan 148,096.30
13,292.80
4,900.95
Jumlah Upah Tenaga 18,193.75
Jumlah Total 166,290.05
2-AHSP Hal.550/693
551
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 166,290
501,640.00
5,016.40
Jumlah Harga Bahan 506,656.40
13,292.80
4,900.95
Jumlah Upah Tenaga 18,193.75
Jumlah Total 524,850.15
Dibulatkan 524,850
2-AHSP Hal.551/693
552
SUB TOTAL (Rp) HSP (Rp)
6 7
605,230.00
6,052.30
Jumlah Harga Bahan 611,282.30
13,292.80
4,900.95
Jumlah Upah Tenaga 18,193.75
Jumlah Total 629,476.05
Dibulatkan 629,470
1,399,030.00
13,990.30
Jumlah Harga Bahan 1,413,020.30
13,292.80
4,900.95
Jumlah Upah Tenaga 18,193.75
Jumlah Total 1,431,214.05
Dibulatkan 1,431,210
978,900.00
9,789.00
Jumlah Harga Bahan 988,689.00
13,292.80
4,900.95
Jumlah Upah Tenaga 18,193.75
Jumlah Total 1,006,882.75
Dibulatkan 1,006,880
200,380.00
2,003.80
Jumlah Harga Bahan 202,383.80
15,951.36
5,881.14
Jumlah Upah Tenaga 21,832.50
Jumlah Total 224,216.30
Dibulatkan 224,210
396,360.00
2-AHSP Hal.552/693
553
SUB TOTAL (Rp) HSP (Rp)
6 7
3,963.60
Jumlah Harga Bahan 400,323.60
15,951.36
5,881.14
Jumlah Upah Tenaga 21,832.50
Jumlah Total 422,156.10
Dibulatkan 422,150
625,965.00
6,259.65
Jumlah Harga Bahan 632,224.65
15,951.36
5,881.14
Jumlah Upah Tenaga 21,832.50
Jumlah Total 654,057.15
Dibulatkan 654,050
2-AHSP Hal.553/693
554
SUB TOTAL (Rp) HSP (Rp)
6 7
217,175.00
2,171.75
Jumlah Harga Bahan 219,346.75
15,951.36
5,881.14
Jumlah Upah Tenaga 21,832.50
Jumlah Total 241,179.25
Dibulatkan 241,170
306,450.00
3,064.50
Jumlah Harga Bahan 309,514.50
15,951.36
5,881.14
Jumlah Upah Tenaga 21,832.50
Jumlah Total 331,347.00
Dibulatkan 331,340
219,455.00
2,194.55
Jumlah Harga Bahan 221,649.55
15,951.36
5,881.14
Jumlah Upah Tenaga 21,832.50
Jumlah Total 243,482.05
Dibulatkan 243,480
344,260.00
3,442.60
Jumlah Harga Bahan 347,702.60
15,951.36
5,881.14
Jumlah Upah Tenaga 21,832.50
Jumlah Total 369,535.10
Dibulatkan 369,530
331,330.00
2-AHSP Hal.554/693
555
SUB TOTAL (Rp) HSP (Rp)
6 7
3,313.30
Jumlah Harga Bahan 334,643.30
19,939.20
7,351.43
Jumlah Upah Tenaga 27,290.63
Jumlah Total 361,933.93
Dibulatkan 361,930
34,150.00
341.50
Jumlah Harga Bahan 34,491.50
13,292.80
4,900.95
Jumlah Upah Tenaga 18,193.75
Jumlah Total 52,685.25
Dibulatkan 52,680
2-AHSP Hal.555/693
556
SUB TOTAL (Rp) HSP (Rp)
6 7
878,795.00
8,787.95
Jumlah Harga Bahan 887,582.95
46,524.80
17,153.33
Jumlah Upah Tenaga 63,678.13
Jumlah Total 951,261.08
Dibulatkan 951,260
19,238.00
192.38
Jumlah Harga Bahan 19,430.38
46,524.80
17,153.33
Jumlah Upah Tenaga 63,678.13
Jumlah Total 83,108.51
Dibulatkan 83,100
23,986.00
239.86
Jumlah Harga Bahan 24,225.86
46,524.80
17,153.33
Jumlah Upah Tenaga 63,678.13
Jumlah Total 87,903.99
Dibulatkan 87,900
37,960.00
379.60
Jumlah Harga Bahan 38,339.60
46,524.80
17,153.33
Jumlah Upah Tenaga 63,678.13
Jumlah Total 102,017.73
Dibulatkan 102,010
386,980.00
2-AHSP Hal.556/693
557
SUB TOTAL (Rp) HSP (Rp)
6 7
3,869.80
Jumlah Harga Bahan 390,849.80
46,524.80
17,153.33
Jumlah Upah Tenaga 63,678.13
Jumlah Total 454,527.93
Dibulatkan 454,520
35,000.00
350.00
Jumlah Harga Bahan 35,350.00
46,524.80
17,153.33
Jumlah Upah Tenaga 63,678.13
Jumlah Total 99,028.13
Dibulatkan 99,020
2-AHSP Hal.557/693
558
SUB TOTAL (Rp) HSP (Rp)
6 7
45,996.50
8,128.00
4,954.88
13,987.68
5,968.94
Jumlah Harga Bahan 79,036.00
13,722.66
8,081.99
930.50
1,052.67
Jumlah Upah Tenaga 23,787.82
Jumlah Total 102,823.82
Dibulatkan 102,820
60,672.70
156,464.00
13,019.20
15,236.58
17,160.71
Jumlah Harga Bahan 262,553.19
37,247.22
21,936.83
2,525.63
2,857.26
Jumlah Upah Tenaga 64,566.94
Jumlah Total 327,120.13
Dibulatkan 327,120
75,707.50
156,464.00
13,019.20
15,236.58
17,160.71
Jumlah Harga Bahan 277,587.99
37,247.22
21,936.83
2,525.63
2,857.26
Jumlah Upah Tenaga 64,566.94
2-AHSP Hal.558/693
559
SUB TOTAL (Rp) HSP (Rp)
6 7
121,583.00
156,464.00
13,019.20
15,236.58
17,160.71
Jumlah Harga Bahan 323,463.49
37,247.22
21,936.83
2,525.63
2,857.26
Jumlah Upah Tenaga 64,566.94
Jumlah Total 388,030.43
Dibulatkan 388,030
2-AHSP Hal.559/693
560
SUB TOTAL (Rp) HSP (Rp)
6 7
181,912.50
156,464.00
13,019.20
15,236.58
17,160.71
Jumlah Harga Bahan 383,792.99
37,247.22
21,936.83
2,525.63
2,857.26
Jumlah Upah Tenaga 64,566.94
Jumlah Total 448,359.93
Dibulatkan 448,350
376,225.50
156,464.00
13,019.20
15,236.58
17,160.71
Jumlah Harga Bahan 578,105.99
37,247.22
21,936.83
2,525.63
2,857.26
Jumlah Upah Tenaga 64,566.94
Jumlah Total 642,672.93
Dibulatkan 642,670
397,068.00
156,464.00
13,019.20
15,236.58
17,160.71
Jumlah Harga Bahan 598,948.49
37,247.22
21,936.83
2,525.63
2,857.26
Jumlah Upah Tenaga 64,566.94
Jumlah Total 663,515.43
2-AHSP Hal.560/693
561
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 663,510
41,656.00
55,616.00
17,484.60
17,469.20
15,334.40
14,926.20
Jumlah Harga Bahan 162,486.40
313,660.80
1,731.86
199.39
2,406.11
Jumlah Upah Tenaga 317,998.16
Jumlah Total 480,484.56
Dibulatkan 480,480
2-AHSP Hal.561/693
562
SUB TOTAL (Rp) HSP (Rp)
6 7
71,120.00
97,328.00
32,471.40
4,991.20
24,918.40
22,389.30
Jumlah Harga Bahan 253,218.30
139,186.98
54,611.16
6,247.62
10,677.12
Jumlah Upah Tenaga 210,722.88
Jumlah Total 463,941.18
Dibulatkan 463,940
105,664.00
144,096.00
45,959.52
8,235.48
46,482.40
29,852.40
Jumlah Harga Bahan 380,289.80
211,721.04
83,129.04
9,570.82
16,241.26
11,545.70
Jumlah Upah Tenaga 332,207.85
Jumlah Total 712,497.65
Dibulatkan 712,490
21,336.00
18,688.24
10,490.76
2,059.29
24,697.20
Jumlah Harga Bahan 77,271.49
45,088.74
22,860.49
2,658.56
2-AHSP Hal.562/693
563
SUB TOTAL (Rp) HSP (Rp)
6 7
4,060.31
Jumlah Upah Tenaga 74,668.10
Jumlah Total 151,939.59
Dibulatkan 151,930
39,116.00
29,214.83
16,485.48
8,416.21
33,365.20
Jumlah Harga Bahan 126,597.72
75,572.65
31,404.30
3,721.98
7,218.34
Jumlah Upah Tenaga 117,917.27
Jumlah Total 244,515.00
Dibulatkan 244,510
2-AHSP Hal.563/693
564
SUB TOTAL (Rp) HSP (Rp)
6 7
115,892.10
119,346.88
56,637.62
Jumlah Harga Bahan 291,876.59
1,139.45
Jumlah Harga Alat 1,139.45
121,653.34
45,951.89
5,290.53
12,421.55
Jumlah Upah Tenaga 185,317.31
Jumlah Total 478,333.35
Dibulatkan 478,330
172,490.56
172,965.76
82,077.71
Jumlah Harga Bahan 427,534.03
1,709.17
Jumlah Harga Alat 1,709.17
188,647.37
60,499.47
6,965.43
20,263.97
Jumlah Upah Tenaga 276,376.24
Jumlah Total 705,619.44
Dibulatkan 705,610
247,955.18
244,457.60
115,997.83
Jumlah Harga Bahan 608,410.61
2,278.90
Jumlah Harga Alat 2,278.90
292,437.73
79,896.24
9,198.62
2-AHSP Hal.564/693
565
SUB TOTAL (Rp) HSP (Rp)
6 7
32,865.99
Jumlah Upah Tenaga 414,398.57
Jumlah Total 1,025,088.09
Dibulatkan 1,025,080
315,334.31
309,654.72
146,933.09
Jumlah Harga Bahan 771,922.11
2,563.76
Jumlah Harga Alat 2,563.76
402,348.39
99,523.93
11,458.39
46,535.71
Jumlah Upah Tenaga 559,866.43
Jumlah Total 1,334,352.30
Dibulatkan 1,334,350
2-AHSP Hal.565/693
566
SUB TOTAL (Rp) HSP (Rp)
6 7
1,400,480.00
Jumlah Harga Bahan 1,400,480.00
111,741.66
65,810.49
7,576.90
8,571.77
Jumlah Upah Tenaga 193,700.82
Jumlah Total 1,594,180.82
Dibulatkan 1,594,180
2,759,250.00
Jumlah Harga Bahan 2,759,250.00
111,741.66
65,810.49
7,576.90
8,571.77
Jumlah Upah Tenaga 193,700.82
Jumlah Total 2,952,950.82
Dibulatkan 2,952,950
3,536,860.00
Jumlah Harga Bahan 3,536,860.00
111,741.66
65,810.49
7,576.90
8,571.77
Jumlah Upah Tenaga 193,700.82
Jumlah Total 3,730,560.82
Dibulatkan 3,730,560
5,511,460.00
Jumlah Harga Bahan 5,511,460.00
111,741.66
65,810.49
7,576.90
8,571.77
Jumlah Upah Tenaga 193,700.82
Jumlah Total 5,705,160.82
2-AHSP Hal.566/693
567
SUB TOTAL (Rp) HSP (Rp)
6 7
Dibulatkan 5,705,160
680,050.00
214,388.13
86,174.10
145,360.00 1,125,972.23
Jumlah Harga Bahan
147,028.50
69,274.20
7,975.68
11,278.65
Jumlah Upah Tenaga 235,557.03
Jumlah Total 1,361,529.26
Dibulatkan 1,361,520
2-AHSP Hal.567/693
568
SUB TOTAL (Rp) HSP (Rp)
6 7
546,460.00
192,581.79
68,689.50
115,782.40 923,513.69
Jumlah Harga Bahan
147,028.50
69,274.20
7,975.68
11,278.65
Jumlah Upah Tenaga 235,557.03
Jumlah Total 1,159,070.72
Dibulatkan 1,159,070
139,181.84
78,929.65
2,562.33
4,267.48
6,180.96
Jumlah Harga Bahan 231,122.26
12,252.38
43,296.38
1,595.14
2,857.26
Jumlah Upah Tenaga 60,001.14
Jumlah Total 291,123.40
Dibulatkan 291,120
174,016.44
78,929.65
2,562.33
4,267.48
6,180.96
Jumlah Harga Bahan 265,956.86
12,252.38
43,296.38
1,595.14
2,857.26
Jumlah Upah Tenaga 60,001.14
2-AHSP Hal.568/693
569
SUB TOTAL (Rp) HSP (Rp)
6 7
195,700.00
96,160.05
2,562.33
4,267.48
6,180.96
Jumlah Harga Bahan 304,870.82
12,252.38
43,296.38
1,595.14
2,857.26
Jumlah Upah Tenaga 60,001.14
Jumlah Total 364,871.96
Dibulatkan 364,870
2-AHSP Hal.569/693
570
SUB TOTAL (Rp) HSP (Rp)
6 7
88,205.40
14,973.60
58,674.00
133,314.08
6,963.77
66,191.70
9,453.26
42,233.34
2,744.81
111.20
140,884.80
15,643.10
9,234.40
6,572.00
17,087.20
Jumlah Harga Bahan 612,286.65
854.59
Jumlah Harga Alat 854.59
260,828.56
21,475.00
12,929.39
118,805.25
29,095.16
21,002.62
22,858.06
Jumlah Upah Tenaga 486,994.06
Jumlah Total 1,100,135.30
Dibulatkan 1,100,130
88,205.40
16,221.40
94,234.00
170,993.92
6,963.77
85,674.54
10,448.34
45,250.01
2,843.43
111.20
158,711.04
20,671.23
13,851.60
2-AHSP Hal.570/693
571
SUB TOTAL (Rp) HSP (Rp)
6 7
9,858.00
25,630.80
Jumlah Harga Bahan 749,668.68
854.59
Jumlah Harga Alat 854.59
338,949.70
22,975.94
14,349.32
166,488.99
43,642.75
28,579.52
29,174.11
Jumlah Upah Tenaga 644,160.33
Jumlah Total 1,394,683.59
Dibulatkan 1,394,680
2-AHSP Hal.571/693
572
SUB TOTAL (Rp) HSP (Rp)
6 7
88,205.40
14,973.60
59,812.50
97,909.44
6,963.77
48,707.10
9,453.26
42,233.34
2,744.81
111.20
171,745.28
15,643.10
3,301.30
2,349.49
6,095.53
Jumlah Harga Bahan 570,249.11
854.59
Jumlah Harga Alat 854.59
205,447.82
21,475.00
12,917.85
74,238.85
10,391.13
13,824.51
18,045.84
Jumlah Upah Tenaga 356,341.01
Jumlah Total 927,444.71
Dibulatkan 927,440
42,632.61
13,226.68
41,687.50
77,445.28
35,564.96
8,492.52
39,216.67
2,629.76
111.20
142,538.04
10,047.27
3,093.52
2,201.62
2-AHSP Hal.572/693
573
SUB TOTAL (Rp) HSP (Rp)
6 7
5,724.21
Jumlah Harga Bahan 424,611.84
783.37
Jumlah Harga Alat 783.37
150,459.17
19,974.06
11,324.76
56,573.93
9,746.88
11,298.88
12,782.47
Jumlah Upah Tenaga 272,160.15
Jumlah Total 697,555.36
Dibulatkan 697,550
2-AHSP Hal.573/693
574
SUB TOTAL (Rp) HSP (Rp)
6 7
67,134.11
5,490.32
10,668.00
55,312.64
6,217.65
29,973.60
3,632.04
18,100.00
1,972.32
111.20
42,552.96
1,153.41
195,610.00
72,285.98
2,654.89
1,889.45
4,912.57
Jumlah Harga Bahan 519,671.14
116,446.57
12,007.53
8,311.75
39,370.84
8,364.86
7,842.75
10,677.12
Jumlah Upah Tenaga 203,021.42
Jumlah Total 722,692.56
Dibulatkan 722,690
67,134.11
5,490.32
10,668.00
55,312.64
6,217.65
29,973.60
3,632.04
18,100.00
1,972.32
111.20
42,552.96
1,153.41
151,728.00
50,635.43
2-AHSP Hal.574/693
575
SUB TOTAL (Rp) HSP (Rp)
6 7
2,654.89
1,889.45
4,912.57
Jumlah Harga Bahan 454,138.59
116,446.57
12,007.53
8,311.75
39,370.84
8,364.86
7,842.75
10,677.12
Jumlah Upah Tenaga 203,021.42
Jumlah Total 657,160.01
Dibulatkan 657,160
2-AHSP Hal.575/693
576
SUB TOTAL (Rp) HSP (Rp)
6 7
2-AHSP Hal.576/693
577
SUB TOTAL (Rp) HSP (Rp)
6 7
#REF!
833.16
646.64
Jumlah Upah Tenaga 1,479.80
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.577/693
578
SUB TOTAL (Rp) HSP (Rp)
6 7
#VALUE!
Jumlah Harga Peralatan #VALUE!
110,271.38
4,699.44
Jumlah Upah Tenaga 114,970.81
Jumlah Total #VALUE!
Dibulatkan #VALUE!
3 kali bolak-balik
213,000.00
Jumlah Harga Bahan 213,000.00
#REF!
24,504.75
3,759.55
2-AHSP Hal.578/693
579
SUB TOTAL (Rp) HSP (Rp)
6 7
2-AHSP Hal.579/693
580
SUB TOTAL (Rp) HSP (Rp)
6 7
4 kali bolak-balik
#REF!
2,450.48
60.15
Jumlah Upah Tenaga 2,510.63
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.580/693
581
SUB TOTAL (Rp) HSP (Rp)
6 7
4 kali bolak-balik
285,288.00
Jumlah Harga Bahan 285,288.00
#REF!
24,504.75
3,759.55
Jumlah Upah Tenaga 28,264.30
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.581/693
582
SUB TOTAL (Rp) HSP (Rp)
6 7
4 kali bolak-balik
28,528.80
Jumlah Harga Bahan 28,528.80
#REF!
2,450.48
375.96
Jumlah Upah Tenaga 2,826.43
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.582/693
583
SUB TOTAL (Rp) HSP (Rp)
6 7
4 kali bolak-balik
6 lintasan u/ agregat kasar;
2 lintasan u/ agregat halus.
229,089.03
41,036.49
Jumlah Harga Bahan 270,125.52
#REF!
98,019.00
5,112.99
Jumlah Upah Tenaga 103,131.99
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.583/693
584
SUB TOTAL (Rp) HSP (Rp)
6 7
6 kali bolak-balik
191,662.08
107,440.99
Jumlah Harga Bahan 299,103.07
#REF!
98,019.00
5,112.99
Jumlah Upah Tenaga 103,131.99
Jumlah Total #REF!
Dibulatkan #REF!
5,294.03
4,248.54
Jumlah Harga Bahan 9,542.57
#REF!
2-AHSP Hal.584/693
585
SUB TOTAL (Rp) HSP (Rp)
6 7
421.48
135.34
Jumlah Upah Tenaga 556.83
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.585/693
586
SUB TOTAL (Rp) HSP (Rp)
6 7
7,326.00
2,198.57
Jumlah Harga Bahan 9,524.57
#REF!
421.48
135.34
Jumlah Upah Tenaga 556.83
Jumlah Total #REF!
Dibulatkan #REF!
9,075.00
451.88
Jumlah Harga Bahan 9,526.88
#REF!
215.64
33.08
Jumlah Upah Tenaga 248.73
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.586/693
587
SUB TOTAL (Rp) HSP (Rp)
6 7
4 kali bolak-balik
9,526.68
5,490.32
2,736.03
577.71
39,600.00
2,798.18
Jumlah Harga Bahan 60,728.92
#REF!
13,869.69
496.40
646.64
Jumlah Upah Tenaga 15,012.73
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.587/693
588
SUB TOTAL (Rp) HSP (Rp)
6 7
20-40%
46-67%
5-9%
minimum 7,3%
2-AHSP Hal.588/693
589
SUB TOTAL (Rp) HSP (Rp)
6 7
3 kali bolak-balik
2-AHSP Hal.589/693
590
SUB TOTAL (Rp) HSP (Rp)
6 7
4 kali bolak-balik
3,034.51
5,384.26
10,842.35
43,717.58
Jumlah Harga Bahan 62,978.69
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Jumlah Harga Peralatan #REF!
235.25
45.11
Jumlah Upah Tenaga 280.36
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.590/693
591
SUB TOTAL (Rp) HSP (Rp)
6 7
30-50%
39-59%
4,5-7,5%
minimum 5,7%
2-AHSP Hal.591/693
592
SUB TOTAL (Rp) HSP (Rp)
6 7
2 kali bolak-balik
4 kali bolak-balik
2-AHSP Hal.592/693
593
SUB TOTAL (Rp) HSP (Rp)
6 7
10,471.53
4,298.16
13,564.29
68,217.60
Jumlah Harga Bahan 96,551.59
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Jumlah Harga Peralatan #REF!
382.27
60.15
Jumlah Upah Tenaga 442.43
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.593/693
594
SUB TOTAL (Rp) HSP (Rp)
6 7
28,528.80
9,526.68
43,822.74
2,736.03
577.71
10,848.00
2,798.18
21,488.20
Jumlah Harga Bahan 120,326.33
#REF!
38,374.44
496.40
2,105.35
Jumlah Upah Tenaga 40,976.18
Jumlah Total #REF!
Dibulatkan #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
28,528.80
38,332.42
21,488.20
13,136.16
3,398.83
3,034.51
5,384.26
10,842.35
Jumlah Harga Bahan 124,145.52
#REF!
#VALUE!
#VALUE!
2-AHSP Hal.594/693
595
SUB TOTAL (Rp) HSP (Rp)
6 7
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Jumlah Harga Peralatan #REF!
25,077.18
1,624.13
Jumlah Upah Tenaga 26,701.31
Jumlah Total #REF!
Dibulatkan #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2-AHSP Hal.595/693
596
SUB TOTAL (Rp) HSP (Rp)
6 7
28,528.80
38,332.42
21,488.20
19,847.68
3,398.83
10,471.53
4,298.16
13,564.29
Jumlah Harga Bahan 139,929.92
#REF!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Jumlah Harga Peralatan #REF!
25,224.21
1,639.16
Jumlah Upah Tenaga 26,863.37
Jumlah Total #REF!
Dibulatkan #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2-AHSP Hal.596/693
597
SUB TOTAL (Rp) HSP (Rp)
6 7
7 kali bolak-balik
3 kali bolak-balik
57,057.60
14,922.36
86,154.20
4,159.51
Jumlah Harga Bahan 162,293.67
#REF!
20,829.04
13,854.84
1,595.14
2,443.71
Jumlah Upah Tenaga 38,722.72
Jumlah Total #REF!
Dibulatkan #REF!
2-AHSP Hal.597/693
598
SUB TOTAL (Rp) HSP (Rp)
6 7
7 kali bolak-balik
3 kali bolak-balik
28,528.80
14,922.36
82,238.10
4,159.51
Jumlah Harga Bahan 129,848.77
#REF!
18,378.56
13,854.84
1,595.14
2,067.75
Jumlah Upah Tenaga 35,896.29
Jumlah Total #REF!
Dibulatkan #REF!
3,243.92
5,130.24
2-AHSP Hal.598/693
599
SUB TOTAL (Rp) HSP (Rp)
6 7
32.87
3,730.59
76,731.38
8,942.80
4,870.71
Jumlah Harga Bahan 102,682.50
7,449.44
2,597.78
299.09
751.91
Jumlah Upah Tenaga 11,098.22
Jumlah Total 113,780.73
Dibulatkan 113,780
2-AHSP Hal.599/693
600
SUB TOTAL (Rp) HSP (Rp)
6 7
20,350.00
12,435.30
Jumlah Harga Bahan 32,785.30
49,009.50
28,864.25
3,323.20
3,759.55
Jumlah Upah Tenaga 84,956.50
Jumlah Total 117,741.80
Dibulatkan 117,740
4,190.00
7,500.00
Jumlah Harga Bahan 11,690.00
4,900.95
3,759.55
Jumlah Upah Tenaga 8,660.50
Jumlah Total 20,350.50
Dibulatkan 20,350
33,200.00
16,540.00
57,340.00
Jumlah Total 107,080.00
Dibulatkan 107,080
#REF!
180,000.00
62,570.00
1,329,280.00
569,860.00
Jumlah Total #REF!
Dibulatkan #REF!
750,000.00
854,790.00
636,820.00
952,580.00
223,000.00
74,000.00
2-AHSP Hal.600/693
601
SUB TOTAL (Rp) HSP (Rp)
6 7
100,000.00
2,500,000.00
Jumlah Total 6,091,190.00
Dibulatkan 6,091,190
3,858,750.00
964,687.50
Jumlah Harga Bahan 4,823,437.50
7,841.52
13,722.66
19,939.20
15,038.20
Jumlah Upah Tenaga 56,541.58
Jumlah Total 4,879,979.08
Dibulatkan 4,879,970
2-AHSP Hal.601/693
602
SUB TOTAL (Rp) HSP (Rp)
6 7
5,806,660.00
284,600.00
158,320.00
8,000.00
7,000.00
515,420.00
Jumlah 6,780,000.00
Dibulatkan 6,780,000
11,907,000.00
119,070.00
Jumlah Harga Bahan 12,026,070.00
29,405.70
53,171.20
Jumlah Upah Tenaga 82,576.90
Jumlah Total 12,108,646.90
Dibulatkan 12,108,640
7,140,000.00
71,400.00
Jumlah Harga Bahan 7,211,400.00
29,405.70
53,171.20
Jumlah Upah Tenaga 82,576.90
Jumlah Total 7,293,976.90
Dibulatkan 7,293,970
3,695,850.00
36,958.50
Jumlah Harga Bahan 3,732,808.50
29,405.70
53,171.20
Jumlah Upah Tenaga 82,576.90
Jumlah Total 3,815,385.40
Dibulatkan 3,815,380
22,160,250.00
221,602.50
Jumlah Harga Bahan 22,381,852.50
2-AHSP Hal.602/693
603
SUB TOTAL (Rp) HSP (Rp)
6 7
29,405.70
53,171.20
Jumlah Upah Tenaga 82,576.90
Jumlah Total 22,464,429.40
Dibulatkan 22,464,420
60,725,700.00
607,257.00
Jumlah Harga Bahan 61,332,957.00
29,405.70
53,171.20
Jumlah Upah Tenaga 82,576.90
Jumlah Total 61,415,533.90
Dibulatkan 61,415,530
2-AHSP Hal.603/693
604
SUB TOTAL (Rp) HSP (Rp)
6 7
26,937,000.00
269,370.00
Jumlah Harga Bahan 27,206,370.00
29,405.70
53,171.20
Jumlah Upah Tenaga 82,576.90
Jumlah Total 27,288,946.90
Dibulatkan 27,288,900
845,928.50
Jumlah Harga Bahan 845,928.50
245,047.50
48,145.57
5,582.98
1,203.06
Jumlah Upah Tenaga 299,979.10
27,560.00
262.00
2,446.25
2,825.25
Jumlah Upah Tenaga 33,093.50
Jumlah Total 1,179,001.10
Dibulatkan 1,179,000
968,530.00
Jumlah Harga Bahan 968,530.00
245,047.50
48,145.57
5,582.98
1,203.06
Jumlah Upah Tenaga 299,979.10
27,560.00
262.00
2,446.25
2,825.25
Jumlah Upah Tenaga 33,093.50
2-AHSP Hal.604/693
605
SUB TOTAL (Rp) HSP (Rp)
6 7
804,091.50
Jumlah Harga Bahan 804,091.50
245,047.50
48,145.57
5,582.98
1,203.06
Jumlah Upah Tenaga 299,979.10
27,560.00
262.00
2,446.25
2,825.25
Jumlah Upah Tenaga 33,093.50
Jumlah Total 1,137,164.10
Dibulatkan 1,137,160
2-AHSP Hal.605/693
606
SUB TOTAL (Rp) HSP (Rp)
6 7
790,142.00
Jumlah Harga Bahan 790,142.00
245,047.50
48,145.57
5,582.98
1,203.06
Jumlah Upah Tenaga 299,979.10
27,560.00
262.00
2,446.25
2,825.25
Jumlah Upah Tenaga 33,093.50
Jumlah Total 1,123,214.60
Dibulatkan 1,123,210
892,331.00
Jumlah Harga Bahan 892,331.00
245,047.50
48,145.57
5,582.98
1,203.06
Jumlah Upah Tenaga 299,979.10
27,560.00
262.00
2,446.25
2,825.25
Jumlah Upah Tenaga 33,093.50
Jumlah Total 1,225,403.60
Dibulatkan 1,225,400
245,047.50
1,203.06
Jumlah Upah Tenaga 246,250.56
#REF!
1,000.00
2-AHSP Hal.606/693
607
SUB TOTAL (Rp) HSP (Rp)
6 7
216,720.00
118,080.00
2,800.00
6,780.00
12,110.00
3,095.00
12,950.00
1,800.00
Jumlah Harga Bahan 374,335.00
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 431,171.98
Dibulatkan 431,170
2-AHSP Hal.607/693
608
SUB TOTAL (Rp) HSP (Rp)
6 7
180,600.00
98,400.00
2,800.00
6,780.00
10,380.00
3,095.00
12,950.00
1,800.00
Jumlah Harga Bahan 316,805.00
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 373,641.98
Dibulatkan 373,640
10,578.00
41,040.00
5,000.00
30,000.00
Jumlah Total 86,618.00
Dibulatkan 86,600.00
180,600.00
51,118.26
2,800.00
2,730.00
13,560.00
20,760.00
7,428.00
Jumlah Harga Bahan 278,996
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,837
Jumlah Total 335,833
Dibulatkan 335,830
231,270.00
2,312.70
Jumlah Harga Bahan 233,582.70
2-AHSP Hal.608/693
609
SUB TOTAL (Rp) HSP (Rp)
6 7
19,939.20
7,351.43
Jumlah Upah Tenaga 27,290.63
Jumlah Total 260,873.33
Dibulatkan 260,870
2-AHSP Hal.609/693
610
SUB TOTAL (Rp) HSP (Rp)
6 7
216,720.00
118,080.00
2,800.00
6,780.00
12,110.00
3,095.00
12,950.00
1,800.00
Jumlah Harga Bahan 374,335.00
39,878.40
14,702.85
2,255.73
Jumlah Upah Tenaga 56,836.98
Jumlah Total 431,171.98
Dibulatkan 431,170
82,500.00
12,640.00
11,240.10
18,645.00
Jumlah Harga Bahan 125,025.10
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
Jumlah Total 235,370.77
Dibulatkan 235,370
39,000.00
12,640.00
11,240.10
18,645.00
Jumlah Harga Bahan 81,525.10
60,771.78
40,409.95
4,652.48
4,511.46
Jumlah Upah Tenaga 110,345.67
2-AHSP Hal.610/693
611
SUB TOTAL (Rp) HSP (Rp)
6 7
43,000.00
11,755.20
4,496.04
24,114.20
Jumlah Harga Bahan 83,365.44
58,811.40
51,955.65
5,981.76
4,511.46
Jumlah Upah Tenaga 121,260.27
Jumlah Total 204,625.71
Dibulatkan 204,620
2-AHSP Hal.611/693
612
SUB TOTAL (Rp) HSP (Rp)
6 7
30,336.00
13,433.58
22,709.96
Jumlah Harga Bahan 66,479.54
29,405.70
11,545.70
1,329.28
1,503.82
Jumlah Upah Tenaga 43,784.50
Jumlah Total 110,264.04
Dibulatkan 110,200.00
2-AHSP Hal.612/693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi m2 105.00 -
2 Pekerjaan Bouwplank & Pengukuran m' 44.00 -
3 Perapihan pondasi tiang pancang dan pot. kepala tiang pancang ttk 19.00 -
4 Gudang & los kerja ls 1.00 -
5 Air kerja ls 1.00 -
6 Listrik kerja ls 1.00 -
7 Paket MCK, Container office dan sampah ls 1.00 -
8 Mob Demob ls 1.00 -
9 Keamanan ls 1.00 -
SUB TOTAL I -
SUB TOTAL II -
-
-
-
-
-
613 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
614 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
615 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
616 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
617 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
618 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
619 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
620 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
621 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
622 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
623 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
624 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
625 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
626 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
627 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
628 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
629 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
630 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
631 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
NO. REKAPITULASI
0 0 Err:502
0 0 Err:502
0 0 Err:502
0 0 Err:502
0 0 Err:502
0 0 Err:502
0 0 Err:502
0 0 Err:502
0 0 Err:502
632 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
0 0 Err:502
0 0 Err:502
JUMLAH Err:502
FEE 10 % Err:502
TOTAL Err:502
DIBULATKAN Err:502
LUAS BANGUNAN 88
633 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi m2 105.00 -
2 Pekerjaan Bouwplank & Pengukuran m' 44.00 -
3 Perapihan pondasi tiang pancang dan pot. kepala tiang pancang ttk 19.00 -
4 Gudang & los kerja ls 1.00 -
5 Air kerja ls 1.00 -
6 Listrik kerja ls 1.00 -
7 Paket MCK, Container office dan sampah ls 1.00 -
8 Mob Demob ls 1.00 -
9 Keamanan ls 1.00 -
SUB TOTAL I -
SUB TOTAL II -
2 Beton K - 250
- Pile Cap
PC1 m3 0.50 -
634 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
PC1A m3 0.50 -
PC1-A1 m3 - -
PC1B m3 0.25 -
PC1C m3 0.20 -
PC2-A m3 0.70 -
PC2-A1 m3 0.35 -
PC2-A2 m3 0.41 -
PC2-A3 m3 - -
PC2C m3 - -
PC2-C1 m3 - -
PC2-C2 m3 - -
- Sloof
TB25 m3 0.07 -
TB25A m3 - -
TB25K m3 - -
TB3 m3 2.49 -
TB3A m3 - -
TB3K m3 0.04 -
TB3AK m3 0.05 -
TB35 m3 0.44 -
Dinding beton atas sloof m3 1.16 -
- Kolom
KB m3 - -
K1 m3 0.07 -
K2 m3 0.58 -
K23 m3 - -
K25 m3 0.40 -
KL25 m3 0.31 -
K3 m3 1.94 -
K3A m3 0.60 -
K35 m3 0.58 -
K4 m3 0.17 -
KL3 m3 - -
KL4 m3 0.21 -
K7 m3 0.17 -
- Balok
B1sK m3 0.02 -
B1 m3 0.27 -
B1 SOPI m3 - -
635 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
B1A m3 0.03 -
B1K m3 0.03 -
B2 m3 0.03 -
B2K m3 0.05 -
B2sK m3 0.02 -
B3 m3 1.26 -
B3A m3 - -
B3T m3 - -
B3s m3 0.24 -
B3sK m3 - -
B4 m3 0.08 -
B4T m3 0.10 -
B5 m3 0.19 -
B5T m3 - -
B6 m3 0.23 -
B6T m3 0.24 -
B11 m3 0.05 -
BS1 (beton BS1 sudah masuk ke dalam perhitungan volume plat) m3 - -
BS3 m3 - -
BS4 m3 - -
BST m3 - -
BA1 m3 - -
BA1s m3 - -
BA2 m3 - -
BA3sK m3 0.05 -
BA3 m3 1.46 -
BA3A m3 0.11 -
BA3K m3 - -
BA3T m3 0.12 -
BA64 m3 - -
BM m3 0.03 -
BM5 m3 - -
Add concrete pada balok m3 0.20 -
- Ring Balok
RB1 m3 0.26 -
- Plat Lantai
S1A (Wiremesh M6-150, t=80 mm) m3 5.23 -
S2 (8-150, t=120 mm) m3 4.53 -
S3 (8-200, t=120 mm) m3 2.94 -
636 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
637 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
PC2-A3 kg - -
PC2C kg - -
PC2-C1 kg - -
PC2-C2 kg - -
- Sloof
TB25 kg 65.06 -
TB25A kg - -
TB25K kg - -
TB3 kg 507.17 -
TB3A kg - -
TB3K kg 11.98 -
TB3AK kg 31.52 -
TB35 kg 110.08 -
Dinding beton atas sloof kg 490.00 -
- Kolom -
KB kg - -
K1 kg 29.96 -
K2 kg 185.00 -
K23 kg - -
K25 kg 103.04 -
KL25 kg 78.57 -
K3 kg 430.28 -
K3A kg 181.89 -
K35 kg 170.79 -
K4 kg 51.14 -
KL3 kg - -
KL4 kg 65.76 -
K7 kg 72.14 -
- Balok
B1sK kg 12.11 -
B1 kg 59.72 -
B1 SOPI kg - -
B1A kg 12.29 -
B1K kg 12.75 -
B2 kg 14.32 -
B2K kg 22.25 -
B2sK kg 9.39 -
B3 kg 315.60 -
B3A kg - -
638 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
B3T kg - -
B3s kg 94.62 -
B3sK kg - -
B4 kg 28.04 -
B4T kg 35.14 -
B5 kg 35.54 -
B5T kg - -
B6 kg 62.42 -
B6T kg 102.37 -
B11 kg 14.89 -
BS1 kg 96.53 -
BS3 kg - -
BS4 kg - -
BST kg - -
BA1 kg - -
BA1s kg 10.36 -
BA2 kg - -
BA3sK kg 19.53 -
BA3 kg 259.06 -
BA3A kg 36.66 -
BA3K kg 10.21 -
BA3T kg 36.60 -
BA64 kg - -
BM kg 10.86 -
BM5 kg 3.56 -
Add concrete pada balok kg - -
- Ring Balok
RB1 kg - -
- Plat Lantai
S1A (Wiremesh M6-150, t=80 mm) kg 202.31 -
S2 (8-150, t=120 mm) kg 336.24 -
S3 (8-200, t=120 mm) kg 225.63 -
S3A (8-150, t=120 mm) kg - -
- Canopi -
BC25 kg 78.63 -
BC25K kg 8.06 -
BC3 kg 125.30 -
BC3K kg 52.32 -
BC5 kg - -
639 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
BS1 kg 10.00 -
BS4 kg - -
BK2 kg 6.07 -
BG kg 11.21 -
Plat Canopy kg 168.29 -
- Tangga kg 284.39 -
- Janggutan kg 15.00 -
- Tanggulan beton kg 74.12 -
- Lisplank beton kg 42.18 -
- Meja beton dapur kg 15.34 -
- Meja beton washtafel toilet utama kg - -
6,516.86
4 Bekisting
- Kolom Praktis
KP m2 16.32 -
- Balok Latai Atas Kusen & Kolom Kusen
BK m2 2.45 -
BKP m2 1.13 -
KK m2 11.12 -
- BP (Balok Elv. +4.750 atas pagar belakang) m2 1.87 -
- BP2 (Balok yang berada di pagar pembatas) m2 - -
- Pile Cap
PC1 m2 4.00 -
PC1A m2 4.00 -
PC1-A1 m2 - -
PC1B m2 2.00 -
PC1C m2 1.30 -
PC2-A m2 3.80 -
PC2-A1 m2 1.90 -
PC2-A2 m2 1.90 -
PC2-A3 m2 - -
PC2C m2 - -
PC2-C1 m2 - -
PC2-C2 m2 - -
- Sloof
TB25 m2 1.20 -
TB25A m2 - -
TB25K m2 - -
TB3 m2 21.64 -
640 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
TB3A m2 - -
TB3K m2 0.37 -
TB3AK m2 0.47 -
TB35 m2 4.37 -
Dinding beton atas sloof m2 31.84 -
- Kolom
KB m2 - -
K1 m2 1.24 -
K2 m2 7.13 -
K23 m2 - -
K25 m2 5.23 -
KL25 m2 3.74 -
K3 m2 24.17 -
K3A m2 7.50 -
K35 m2 6.97 -
K4 m2 1.91 -
KL3 m2 - -
KL4 m2 2.29 -
K7 m2 3.04 -
- Balok
B1sK m2 0.38 -
B1 m2 3.56 -
B1 SOPI m2 - -
B1A m2 0.29 -
B1K m2 0.44 -
B2 m2 0.44 -
B2K m2 0.64 -
B2sK m2 0.32 -
B3 m2 16.86 -
B3A m2 - -
B3T m2 - -
B3s m2 4.42 -
B3sK m2 - -
B4 m2 0.84 -
B4T m2 1.02 -
B5 m2 2.59 -
B5T m2 - -
B6 m2 2.30 -
B6T m2 2.35 -
641 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
B11 m2 0.72 -
BS1 (bekisting Balok BS1 sudah masuk ke dalam perhitungan bekisting plat) m2 - -
BS3 m2 - -
BS4 m2 - -
BST m2 - -
BA1 m2 - -
BA1s m2 0.42 -
BA2 m2 - -
BA3sK m2 0.92 -
BA3 m2 19.07 -
BA3A m2 1.49 -
BA3K m2 0.38 -
BA3T m2 1.55 -
BA64 m2 - -
BM m2 0.60 -
BM5 m2 - -
Add concrete pada balok m2 6.98 -
- Ring Balok
RB1 m2 5.49 -
- Plat Lantai
S1A (Wiremesh M6-150, t=80 mm) m2 2.60 -
S2 (8-150, t=120 mm) m2 31.16 -
S3 (8-200, t=120 mm) m2 26.29 -
S3A (8-150, t=120 mm) m2 - -
- Canopi
BC25 m2 4.90 -
BC25K m2 0.37 -
BC3 m2 5.04 -
BC3K m2 1.53 -
BC5 m2 - -
BS1 m2 - -
BS4 m2 - -
BK2 m2 0.37 -
BG m2 0.49 -
plat canopy m2 18.11 -
- Tangga m2 17.87 -
- Janggutan m2 5.16 -
- Tanggulan beton m2 27.65 -
- Lisplank beton m2 10.96 -
642 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
- Parapet Bata m2 - -
- Meja beton dapur m2 1.13 -
- Meja beton washtafel toilet utama m2 - -
402.60
5 Water proofing type Coating ex. Sika/ setara
- Waterproofing coating (KM/WC, Balkon, Kanopi) m2 41.58 -
- Waterproofing coating + kawat ayam (atap dak beton) m2 25.03 -
643 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
1 Pekerjaan pasangan batu bata ringan (PRO 889) Ex. Power Bond
Lantai 1 m2 167.37 -
Lantai 2 m2 146.44 -
2 Pekerjaan pasangan batu bata biasa (PRO 879), rolag, pelapis groundtank
Lantai 1 m3 1.06 -
Lantai 2 m2 - -
3 Pekerjaan plesteran dalam (PRO 879) Ex. Power Bond
Lantai 1 m2 161.69 -
Lantai 2 m2 141.49 -
4 Pekerjaan plesteran luar (PRO 879) Ex. Power Bond
Lantai 1 m2 112.83 -
Lantai 2 m2 113.46 -
5 Pekerjaan plester trasram (PRO 879) Ex. Power Bond
Lantai 1 m2 42.01 -
Lantai 2 m2 56.84 -
6 Pekerjaan acian dalam (PRO 869) Ex. Power Bond
Lantai 1 m2 168.93 -
Lantai 2 m2 138.31 -
7 Pekerjaan acian luar (PRO 869) Ex. Power Bond
Lantai 1 m2 112.83 -
Lantai 2 m2 113.46 -
8 Pek plester ddg batas luar atas plafond (PRO 879) Ex. Power Bond
Lantai 1 m2 12.57 -
Lantai 2 m2 16.61 -
9 Tali air pada kanopi m' 36.41 -
10 Plester texture dinding pagar belakang m2 49.24 -
11 Ban-banan pada dinding pagar belakang lebar 30 cm m' 53.00 -
12 Finishing beton exposed (tangga, kanopi, janggutan, dll) m2 22.50 -
13 Finishing lubang kusen aluminium + kongliong m2 41.54 -
14 Tanggulan dudukan railing tangga dan railing balkon m' 6.80 -
15 Tanggulan samping carport m' 11.00 -
SUB TOTAL IV -
V. PEKERJAAN ATAP
1 Rangka atap
644 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
- Rangka Atap baja ringan ex. Bluescope by Manunggal (maxitop) incl. alm foil m2 53.00 -
- Lisplank 0,8x30; 0,8x10 wood plank ex. Elephant / setara, compound sambungan sika construction ex. Sika m' 28.00 -
2 Penutup Atap
- Genteng beton m2 53.00 -
- Nok genteng + papan ruiter + cat genteng m' 16.91 -
- Nok ujung bh 4.00 -
- Nok dua arah bh - -
- Nok tiga arah bh - -
- Nok 4 arah bh 1.00 -
- Jurai Dalam m' - -
- Flashing m' 9.53 -
- Genteng Tepi (pada tepi standard) m' 4.10 -
SUB TOTAL V -
SUB TOTAL VI -
645 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
2 Architrave (di kusen kayu) - Engineering Wood 2.5x5 ex. MGS m' -
5 Pintu Lainnya
- Pintu besi hollow 2x4; 4x4 tebal 1.6mm untuk area tangga putar ex. Wina unit - -
- Pintu KM/WC PVC+Jalusi ex. Super Murico unit - -
- Pt. PG metal garasi (incl.kusen+rel+accs. lengkap) ex. Wina unit - -
646 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
647 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
4 Ruangan Keramik 30x30 Rocky Grey ex. Kia Impresso (khusus rumah type Master)
- Area Tangga Putar dan Dak Jemur m2 - -
7 Halaman Belakang
- Paving Block 10x10x6cm ex. Karya Dinamika m2 8.35 -
- Andesit Bakar 10x10cm, koral sikat 0.5cm Ex. Lokal (sesuai gambar) m2 2.12 -
- Kansteen jepit 10.20.40 K225 ex. Karya Dinamika m' 2.10 -
648 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
B. MEJA DAPUR
- Kitchen Zink Type 80PK ex. BENSTON bh 1.00 -
- Kran Zink T30ARO 13 N bh 1.00 -
C. EXTERIOR
- Kran taman T26-13 ex. TOTO bh 1.00 -
- Kran carport T26-13 ex. TOTO bh 1.00 -
- Kran mesin cuci T26-13 ex. TOTO bh 1.00 -
- Roof drain cast iron ex. Antasan bh 4.00 -
- Floor drain balkon dan dak jemur HT 51 ex. Antasan bh 1.00 -
SUB TOTAL IX -
649 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
SUB TOTAL X -
650 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
SUB TOTAL XI -
651 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
Railing tangga rangka hollow 2x4cm, 4x4cm, t = 1,6mm, hand rail kayu kamper Samarinda 6x10 cm ex. Lokal termasuk
1 m' 3.42 -
cat
2 Railing balkon besi, rangka hollow 2x4cm, 4x4cm, t = 1,6mm, handrail 72x75 finish cat m' 3.05 -
3 Anti rayap m2 105.00 -
4 Bak meter PAM beton cetak ex. Karya Dinamika + tutup Metal + finishing cat unit 1.00 -
5 Sumur Resapan beton berpori smartwell XLD ex. Dusaspun unit 1.00 -
6 Bak kontrol air hujan tutup plat beton cetak unit 3.00 -
7 Septictank Biomitra HD BM 8 (kapasitas 6-8 orang) Ex Mitra Sarana Jaya unit 1.00 -
8 Ground tank 1 m3 fiber glass ex. Mitra + tutup plat besi 3mm, pelampung V41-3/4" (asli) ex. San-Ei unit 1.00 -
9 Roof tank, 1 m3 fiber ex. Mitra termasuk pelampung ST 70-AB ex. Radar dan dudukan beton & rangka baja unit 1.00 -
652 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
653 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
NO. REKAPITULASI
654 / 693
SUMMARECON SERPONG PROJECT file:///var/www/apps/conversion/tmp/scratch_7/354862427.xlsx
PT. SERPONG CIPTA KREASI GADING SERPONG TANGERANG
JUMLAH Err:502
FEE 10 % Err:502
TOTAL Err:502
DIBULATKAN Err:502
LUAS BANGUNAN 88
655 / 693
Volume Rumah
Pekerjaan Persiapan P L T
Pemb. Lokasi 15.00 7.00 -
Bouwplank 15.00 7.00 -
Unit Volume Satuan
1 105.00 m2
1 44.00 m'
PERHITUNGAN VOLUME
Pekerjaan : Pekerjaan Pembangunan Kantor
Lokasi : Jl. Sinabung no.18A
VOLUME / UNIT
NO URAIAN PEKERJAAN P.I.C P L T
(METER) (METER) (METER)
II PEKERJAAN STRUKTUR
A. PEKERJAAN PONDASI DAN DINDING BASEMENT UNTUNG
1 Galian tanah
2 Bored pile dia 40 L = 3 m'
3 Perapihan kepala Bored pile
4 Urugan pasir
5 Lantai kerja
6 Beton tapak K - 275
7 Beton plat lantai basement
8 Water proofing lantai basement
9 Beton dinding basement
10 Water proofing dinding basement
11 Pedestal kolom
12 Angkur 22 L : 60 cm
13 Base plate t : 12,5 mm
14 Plat rib pedestal kolom
VOLUME / UNIT
NO URAIAN PEKERJAAN P.I.C P L T
(METER) (METER) (METER)
15 Urugan tanah samping pondasi
16 Urugan tanah s.d elevasi -1.50 dipadatkan
17 Perataan tanah
18 Urugan pasir alas lantai sparasi
19 Cor beton lantai sparasi t : 7 cm, tulangan wiremesh
4 Alat bantu sambungan, klem, lem dll untuk mendukung 1.00 1.00 1.00
sempurna nya pekerjaan pemipaan
VOLUME / UNIT
NO URAIAN PEKERJAAN P.I.C P L T
(METER) (METER) (METER)
B. PEKERJAAN ELEKTRIKAL
1 Pekerjaan Listrik
a. Peralatan Utama
- Panel Utama 1.00 1.00 1.00
- Panel Lantai 1.00 1.00 1.00
- Panel Pembagi 1.00 1.00 1.00
b. Pengkabelan
- Kabel tofur dari PLN ke meteran 1.00 1.00 1.00
- Kabel tofur dari meteran ke Panel Utama 1.00 1.00 1.00
- Kabel tofur dari Panel Utama ke Panel Lantai 1.00 1.00 1.00
- Kabel tofur dari Panel Lantai ke Panel Pembagi 1.00 1.00 1.00
c. Instalasi dan Armarture lampu
Instalasi stop kontak 1.00 1.00 1.00
Instalasi lampu 1.00 1.00 1.00
Armarture lampu 1.00 1.00 1.00
UNIT KOEFISIEN
UNIT VOLUME TAMBAH /
TOTAL ESTIMASI
KURANG VOLUME ITEM
T. VOL VOLUME KELEBIHAN
QTY/UNIT JMLH. UNIT T. UNIT PEKERJAAN
PEKERJAAN
UNIT KOEFISIEN
UNIT VOLUME TAMBAH /
TOTAL ESTIMASI
KURANG VOLUME ITEM
T. VOL VOLUME KELEBIHAN
QTY/UNIT JMLH. UNIT T. UNIT PEKERJAAN
PEKERJAAN
UNIT KOEFISIEN
UNIT VOLUME TAMBAH /
TOTAL ESTIMASI
KURANG VOLUME ITEM
T. VOL VOLUME KELEBIHAN
QTY/UNIT JMLH. UNIT T. UNIT PEKERJAAN
PEKERJAAN
UNIT KOEFISIEN
UNIT VOLUME TAMBAH /
TOTAL ESTIMASI
KURANG VOLUME ITEM
T. VOL VOLUME KELEBIHAN
QTY/UNIT JMLH. UNIT T. UNIT PEKERJAAN
PEKERJAAN