Anda di halaman 1dari 795

No.

Uraian Pekerjaan Satuan Harga Satuan


Rp.
1 2 3 4
A JENIS AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADI.
1 Tanah Urug M³ 96,311.00
2 Tanah merah M³ 82,520.00
3 Tanah gembur Lembang M³ 113,135.00
4 Tanah Liat M³ 120,000.00
5 Pasir urug M³ 100,000.00
6 Pasir batu ( sirtu ) tersaring M³ 164,560.00
7 Sirtu M³ 186,703.00
8 Pasir pasang M³ 135,278.00
9 Pasir beton M³ 210,540.00
10 Pasir Aspal M³ 226,031.00
11 Abu batu M³ 156,850.00
12 Krikil M³ 186,703.00
13 Batu gosok (apung) kg 18,150.00
14 Batu pecah mesin 1/2:1 M³ 172,380.00
15 Batu pecah mesin 1:2 M³ 212,470.00
16 Batu pecah mesin 2:3 M³ 195,120.00
17 Batu pecah mesin 3:5 M³ 181,570.00
18 Batu pecah 5:7 M³ 155,050.00
19 Batu pecah 7:10 M³ 142,710.00
20 Batu pecah 10:15 M³ 113,050.00
21 Batu belah pondasi M³ 113,030.00
22 Batu Bronjong M³ 130,000.00
23 Batu Koral Beton Kali M³ 148,100.00
24 Batu templek hitam M² 72,600.00
25 Batu pinggir Beton 10x20x35 (Kansteen) bh 26,800.00
26 Batu pinggir Beton 15x35x60 (K-225) bh 48,750.00
27 Batu Telor M³ 102,850.00
28 Batu templek hijau M² 66,000.00
29 Batu templek Palimanan M² 60,500.00
30 Batu pearlstone warna kg 8,540.00
31 Batu granit kg 6,930.00
32 Batu Andesit ukuran 20 x 40 x 8 cm M² 180,000.00
34 Batako besar uk. 8 x 20 x 30 bh 2,470.00
35 Con Block uk. 8 x 20 x 40 bh 4,950.00
36 Bata merah bakar kelas I bh 798
37 Bata merah bakar kelas II bh 660
38 Bata merah oven (klingker) bh 1,650.00
39 Batako berlobang ( HB. 10 ) bh 2,750.00
40 Batako berlobang ( HB. 15 ) bh 3,520.00
41 Batako berlobang ( HB. 20 ) bh 4,400.00
42 Beton rooster, uk. 20 x 20 cm bh 5,940.00
43 Beton dekoratif, uk. 10 x 20 x 40 bh 5,940.00
44 Beton conblock ( CB. 10 ) bh 5,940.00
45 Beton conblock ( CB. 15 ) bh 6,600.00
46 Beton conblock ( CB. 20 ) bh 7,150.00
47 Batacote kg 49,500.00
48 Paving block Natural 8 cm M² 109,440.00
49 Paving block Warna 8 cm M² 119,370.00
50 Paving block Natural 6 cm M² 100,980.00
51 Paving block Warna 6 cm M² 110,000.00
52 Kansteen Pavingblock bh 26,800.00
53 Semen Tiga Roda kg 1,379.40
53 Semen Tiga Roda (50 kg) zak 68,970.00
54 Semen putih zak 87,000.00
55 Semen warna kg 13,250.00
56 Semen Merah (Bubuk Bata) M³ 75,000.00
57 Batu pinggir beton uk. 6 x 15 x 40 cm (Kaansteen) bh 27,500.00
58 Batu pinggir beton uk. 10 x 20 x 35 cm (Kaansteen) bh 32,500.00
59 Lantai Kerja Beton K - 100 M³ 805,811.00
60 Beton K - 125 M³ 862,471.00
61 Beton K - 150 M³ 893,367.00
62 Beton K - 175 M³ 929,870.00
63 Beton K - 200 M³ 964,842.00
64 Beton K - 225 M³ 990,756.00
65 Beton K - 250 M³ 1,008,217.00
66 Beton K - 275 M³ 1,038,526.00
67 Beton K - 300 M³ 1,047,538.00
68 Beton K - 325 M³ 1,121,945.00
69 Beton K - 350 M³ 1,134,151.00
70 Beton siklop M³ 2,527,467.00
71 Kapur Pasang / Kapur tembok M³ 99,770.00
72 Biaya Pompa Ready Mix M³ 80,000.00
73 Material Agregat Kelas A M³ 145,000.00
74 Material Agregat Kelas B M³ 120,000.00
75 Urugan Pilihan M³ 75,000.00
76 Gorong - gorong Beton tanpatulang dia. Dalam 20 - 30 cm M¹ 96,000.00
77 Gorong - gorong Beton bertulang dia. Dalam 45 cm M¹ 266,700.00
78 Gorong - gorong Beton bertulang dia. Dalam 45 - 75 cm M¹ 373,400.00
79 Gorong - gorong Beton bertulang dia. Dalam 75 - 95 cm M¹ 586,800.00
80 Gorong - gorong Beton bertulang dia. Dalam 95 - 120 cm M¹ 960,300.00
81 Gorong - gorong Beton bertulang dia. Dalam 120 - 150 cm M¹ 1,600,000.00
galian tanah 78312.94
Galian untuk rembesan 56814
ijuk 250000
penutup beton 2537064
urugan kembali 13029
82 Tiang pancang (Pole) square 25 M¹ 225,000.00
B. BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA
83 Plamir tembok kg 13,500.00
84 Cat tembok DULUX Eksterior weathershield std ltr 84,000.00
85 Cat tembok DULUX Interior standard colour ltr 54,800.00
86 Cat tembok Catylac Eksterior gln 187,550.00
87 Cat tembok Catylac Interior gln 175,450.00
88 Cat tembok Vinilex gln 150,000.00
89 Cat tembok Sanlex gln 110,000.00
90 Cat tahan asam gln 118,150.00
91 Cat Marka / Spotlight kg 107,030.00
92 Waterprofing Emulsion kg 99,770.00
93 Waterprofing Membrance M¹ 78,650.00
94 Rol cat bh 38,500.00
95 Kape tembok bh 11,000.00
96 Kape kayu bh 10,450.00
97 Solignem ( 1 blek = 10 liter ) ltr 6,750.00
98 Plint coat kg 41,030.00
99 Kuas 3" bh 18,500.00
100 Kuas 4" bh 20,000.00
101 Dempul halus / Impra (Wood Filler) kg 42,350.00
102 Terpentin ltr 10,650.00
103 Thiner Kayu impala ltr 21,000.00
104 Thiner B ltr 33,270.00
105 Kompon kg 46,970.00
106 Ampelas lbr 4,436.00
107 Dempul kayu kg 21,578.00
108 Meni besi / kayu kg 20,250.00
109 Zinchromate kg 54,690.00
110 Cat kayu kg 49,500.00
111 Cat besi kg 49,500.00
112 Cat Duco kg 181,500.00
113 Cat Brom kg 59,180.00
114 Cat Digalvanis kg 52,500.00
115 Cat dasar Jembatan ltr 15,120.00
116 Cat tembok Wiratex kg 45,000.00
117 Cat Marka kg 55,000.00
118 Cat primer kg 200,970.00
119 Cat dasar Alkali dulux ltr 46,400.00
120 Cat dasar tembok, Indo 9000 Sealer Water Base kg 24,330.00
121 Vernis ltr 33,000.00
122 Minyak Bekisting ltr 16,500.00
123 Sirlak ex India kg 145,000.00
124 Spirtus ltr 9,333.00
125 Oker putih kg 19,250.00
126 Oker warna kg 24,750.00
127 Dempul Plitur kg 31,433.00
128 Dempul lilin kg 7,860.00
129 Dempul plastik kg 31,284.00
130 Glass Bead kg 19,480.00
131 Thermo Plastic kg 37,180.00
132 Oten ( pewarna plituran ) bks 8,250.00
133 Melamik kg 42,350.00
134 Plitur jadi DX ltr 42,350.00
135 Plitur jadi Ultran ltr 52,250.00
136 Teak Oil ltr 24,750.00
137 Soda Coustic kg 20,000.00
138 SEIV Gloss warna standar ltr 45450
Cat dasar kayu kg 31500
Cat penutup kayu dulux kg 48000
Penutup Plafond Dullux Pentalite Ceiling kg 26080
138 Minyak Pelebur Cat (Soda api) klg 38,500.00
C. BAHAN KAYU BERIKUT BAHAN JADINYA
139 Bambu dia 5 - 7 Cm btg 22,500.00
140 Bambu dia 7 - 10 Cm btg 32,500.00
141 Bambu Gombong btg 50,490.00
142 Kayu Terentang M³ 1,996,500.00
143 Kayu kamper Singkil / Kapur M³ 6,365,000.00
144 Kayu balok Borneo super M³ 4,455,000.00
145 Kayu papan Borneo super M³ 5,147,000.00
146 Kayu balok kamper Medan M³ 5,687,000.00
147 Kayu papan kamper Medan M³ 6,365,000.00
148 Kayu balok kamper Banjar M³ 6,050,000.00
149 Kayu papan kamper Banjar M³ 6,352,000.00
150 Kayu balok kamper Samarinda M³ 8,293,000.00
151 Kayu papan kamper Samarinda M³ 9,018,000.00
152 Kayu balok Rasamala M³ 2,403,500.00
153 Kayu Jati Jateng Tua lepas Mata dari Ø 80 cm keatas M³ 25,439,000.00
154 Kayu Jati Jabar Tua lepas Mata dari Ø 80 cm keatas M³ 17,077,500.00
155 Kayu Jati Jabar Ø 40 cm keatas M³ 8,728,000.00
156 Kayu balok Albasia M³ 1,705,000.00
156 Kayu papan Meranti 3/20 M³ 3,000,000.00
157 Kayu papan Albasia M³ 1,815,000.00
158 Dolken dia 5 s/d 7 cm btg 24,970.00
159 Dolken dia 8 s/d 10 cm btg 29,600.00
160 List profil kayu kamper 1 cm M¹ 3,820.00
161 List profil kayu kamper 2 cm M¹ 4,510.00
162 List profil kayu kamper 4 cm M¹ 5,690.00
163 List profil kayu kamper 5 cm M¹ 7,640.00
164 List profil kayu kamper 10 cm M¹ 22,385.00
165 Pegangan tangga ( balustrade ) profil jati M¹ 129,800.00
166 Pegangan tangga ( balustrade ) kamper Banjar M¹ 41,140.00
167 Reng uk. 2/3 kayu Borneo Super M³ 5,147,000.00
168 Reng uk. 2/3 kayu Kamper Banjar M³ 6,352,000.00
169 Reng uk. 3/4 kayu Kamper Banjar M³ 6,352,000.00
170 Kayu balok Meranti, uk 6/12 M³ 2,800,000.00
170 Kayu kaso Meranti, uk 5/7 M³ 2,400,000.00
170 Kayu kaso Borneo , uk. 5/7 M³ 5,147,000.00
D. BAHAN PENUTUP RANGKA PLAFOND
171 Eternit 4 mm 100 x 100 cm M² 14,000.00
172 Hardflex 5 mm, uk. 120 x 240 cm lbr 92,400.00
173 Gypsum Jayaboard 9 mm lbr 63,000.00
174 Gipsum 120 x 240 cm ex LN lbr 96,250.00
175 GRC lbr 84,150.00
176 List Gipsump C - 7 Profil M¹ 12,100.00
177 List Gipsump 10 cm M¹ 13,310.00
178 List Gipsump 14 cm M¹ 18,150.00
179 Akustik Amstrong NDF. 0,60 X 1,20 x 0,015 lbr 18,970.00
180 Akustik Amstrong NDF. 0,30 X 0,60 x 0,015 lbr 11,110.00
181 Akustik Amstrong NDF. 0,30 X 0,30 x 0,015 lbr 9,500.00
182 Triplek 3 mm 1,20 x 2,40 lbr 47,300.00
183 Triplek 4 mm 1,20 x 2,40 lbr 58,300.00
184 Triplek 4 mm, ukuran pintu lbr 55,000.00
185 Triplex 6 mm 1,20 x 2,40 lbr 80,300.00
186 Jabarwood 4 mm 1,20 x 2,40 lbr 104,500.00
187 Bilik bambu (Tanpa kulit) ukuran 2 x 2,50 m lbr 39,050.00
188 Bilik bambu (Dengan kulit) ukuran 2 x 2,50 m lbr 81,070.00
189 Bilik bambu hitam Variasi M² 27,500.00
190 Wallpaper (kelas menengah) M² 55,000.00
191 Wall paper biasa, uk. 0.50 x 10.00 m rol 102,850.00
192 Wall paper corak, uk. 0.50 x 10.00 m rol 242,000.00
193 Multiplek 9 mm, uk. 1,20 x 2,40 lbr 137,500.00
194 Multiplek 12 mm, uk. 1,20 x 2,40 lbr 176,000.00
195 Multiplek 18 mm, uk. 1,20 x 2,40 lbr 203,500.00
196 Play Wood 18 mm, uk. 1,20 x 2,40 lbr 323,400.00
197 Teakwood 3 mm, uk. 1,20 x 2,40 lbr 107,250.00
198 Teakwood 4 mm, uk. 1,20 x 2,40 lbr 121,000.00
199 Teakwood 3 mm, ukuran pintu lbr 88,000.00
200 Teakwood 4 mm, ukuran pintu lbr 107,800.00
201 Melamin 4 mm, uk. 1,20 x 2,40 lbr 133,100.00
202 Melamin TIK 4 mm lbr 112,000.00
203 Formika putih polos, uk. 1,20 x 2,40 lbr 133,100.00
204 Formika motif, ukuran pintu lbr 129,470.00
205 Partikel board, 1.20 x 2.40 lbr 102,850.00
206 Soft board, 1.20 x 2.40 lbr 48,400.00
207 Dome Gipsump type Merak dia 85 cm bh 247,500.00
208 Dome Gipsump type Bunga dia 90 cm bh 302,500.00
209 Eternit hardflex 5 mm, uk. 1.05 x 2.40 lbr 121,000.00
210 Eternit asbes semen, 1.00 x 1.00 x 3,5 mm lbr 13,500.00
211 Eternit asbes semen, 1.00 x 1.00 x 4,0 mm lbr 14,520.00
212 Eternit asbes semen, 1.00 x 1.00 x 5,0 mm lbr 18,150.00
213 Eternit asbes semen, 1.00 x 1.00 x 6,0 mm lbr 22,500.00
213 Polywood t.9mm lbr 93,500.00
214 Aclirick ( 1.40 x 2.50 ) lbr 660,000.00
E. BAHAN LANTAI DAN PELAPIS DINDING.
215 Tegel PC. Abu - abu, 20 x 20 cm Bh 1,430.00
216 Tegel PC. Abu - abu, 30 x 30 cm Bh 2,200.00
217 Tegel PC. Abu - abu, 40 x 40 cm Bh 2,420.00
218 Tegel PC. warna, 20 x 20 cm Bh 2,100.00
219 Tegel PC. warna, 30 x 30 cm Bh 2,600.00
220 Tegel PC. warna, 40 x 40 cm Bh 3,000.00
221 Tegel wafer. PC, 20 x 20 cm Bh 1,500.00
222 Tegel wafer. warna, 20 x 20 cm Bh 2,300.00
223 Tegel plint abu - abu, 15 x 20 cm Bh 1,300.00
224 Tegel plint abu - abu, 10 x 30 cm Bh 1,400.00
225 Tegel plint warna, 15 x 20 cm Bh 1,500.00
226 Tegel plint warna, 10 x 30 cm Bh 2,470.00
227 Tegel plint warna, 10 x 40 cm Bh 2,500.00
228 Tegel plint teraso, 10 x 30 cm Bh 4,500.00
229 Tegel plint teraso, 10 x 40 cm Bh 6,000.00
230 Tegel plint granit, 10 x 40 cm Bh 7,500.00
231 Tegel plint granit, 10 x 30 cm Bh 4,750.00
232 Ubin plint Teralux Kerang, 10 x 40 cm Bh 9,650.00
233 Ubin plint Teralux Kerang, 10 x 30 cm Bh 6,500.00
234 Ubin plint Teralux Marmer, 10 x 40 cm Bh 12,500.00
235 Ubin plint Teralux Marmer, 10 x 30 cm Bh 8,500.00
236 Tegel badak PC 30 x 30 cm Bh 2,300.00
237 Tegel Teraso 40 x 40 cm Bh 3,000.00
238 Tegel Teraso 30 x 30 cm Bh 2,750.00
239 Tegel Pearlstone / Beton sikat 30 x 30 x 3 cm warna Bh 13,270.00
240 Tegel Pearlstone / Beton sikat 40 x 40 x 3 cm warna Bh 23,990.00
241 Tegel Teralux 40 x 40 cm Bh 24,500.00
242 Tegel Teralux 30 x 30 cm Bh 13,750.00
243 Teraso Cor M³ 1,250,000.00
244 Tegel Classic Stone 30 x 30 x 3 cm (Natural) Bh 7,390.00
245 Tegel Classic Stone 30 x 30 x 3 cm (Warna) Bh 8,240.00
246 Tegel Classic Tile 30 x 30 x 3 cm (Natural) Bh 6,320.00
247 Tegel Classic Tile 30 x 30 x 3 cm (Warna) Bh 7,360.00
248 Tegel Classic Keramik 30 x 30 x 0,06 cm M² 72,900.00
249 Tegel Classic Keramik 30 x 30 x 0,05 cm M² 57,500.00
250 Porcelein 11 x 11 warna standar DN M² 59,350.00
251 Porcelein 11 x 11 warna khusus DN M² 63,525.00
252 Keramik 10/10, 10/20, 20/20, KW I putih / polos M² 51,900.00
253 Keramik 10/10, 10/20, 20/20, KW I warna M² 57,200.00
254 Plint Keramik 5/20, corak warna, anti slip bh 1,250.00
255 Plint Keramik 10/20 warna bh 1,500.00
256 Plint Keramik cove artistyik (5 x 5 x 20) bh 1,750.00
257 Under layer ruber corrugated M² 45,000.00
258 Lantai kayu (Gymfloor) M² 150,000.00
259 Keramik dinding 10/20, corak warna, anti slip M² 57,200.00
260 Keramik dinding 15/15, putih polos M² 53,350.00
261 Keramik dinding 15/15, corak warna, anti slip M² 57,200.00
262 Keramik dinding 20/20, corak warna, anti slip M² 58,960.00
263 Keramik 20/20, KW I putih / polos M² 51,900.00
264 Keramik dinding 20/25, putih / polos, M² 53,350.00
265 Keramik dinding 20/25, corak warna, M² 57,250.00
266 Keramik lantai 30 x 30, DN putih polos M² 54,550.00
267 Keramik lantai 30 x 30 DN warna /corak, anti slip M² 57,200.00
268 Keramik lantai 40 x 40 DN warna /corak M² 71,500.00
269 Keramik Mozaik lantai 30 x30 DN warna /corak, anti slip M² 61,200.00
270 Stairmosing keramik 10 / 20 M¹ 13,310.00
271 Stairmosing keramik Fiber M¹ 15,125.00
272 Granit alam LN ukuran besar M² 2,053,920.00
273 Granit alam LN ukuran kecil M² 1,727,660.00
274 Granit alam DN ukuran besar M² 1,510,520.00
275 Granit alam DN ukuran kecil M² 1,401,290.00
276 Lantai Vinil karet, 30 x 30 lbr 4,650.00
277 Lantai Vinil motif kembang, 30 x 30 lbr 6,000.00
278 Granito tile essenza 40 x 40 polis M² 242,000.00
279 Granito tile essenza 40 x 40 unpolis M² 175,450.00
280 Granito tile essenza 60 x 60 polis M² 312,600.00
281 Granito tile essenza 60 x 60 unpolis M² 277,400.00
282 Lantai Marmer Citatah uk. 15/30 M² 95,161.00
283 Lantai Marmer Citatah uk. 20/30 M² 109,802.00
284 Lantai Marmer Citatah uk. 30/30 M² 124,443.00
285 Lantai Marmer Citatah uk. 40/40 M² 147,069.00
286 Lantai Marmer Citatah uk. 60/60 M² 212,500.00
287 Lantai Marmer Citatah uk. 100/100 M² 242,000.00
288 Bata krawang bh 8,250.00
289 Batu paras M² 75,000.00
290 Floor Hardener kg 16,500.00
291 Lantai Parquet motif jati uk. 1.2 x 5.0 x 25.00 cm M² 117,120.00
292 Lantai Parquet motif jati uk. 1.2 x 5.0 x 30.00 cm M² 126,440.00
293 Flooring Jati uk. 1.50 x 9.0 x 60/90 - 105.00 cm M² 465,850.00
294 Flooring Dedan uk. 1.50 x 9.0 x 60/75/90.00 cm M² 106,480.00
295 Ongkos pasang + Finishing M² 106,480.00
296 Lantai kayu HDM ex Germany uk. 18.50 x 118.40 x 7.00 cm M² 326,090.00
297 Lem kayu u/ HDM. ( 1 tube /10.00 m2 ) Tube 71,500.00
298 Karpet ex. Lokal, Long life ( l = 4.00 m ) M¹ 66,550.00
299 Karpet ex. Lokal, Wonder ( l = 4.00 m ) M¹ 181,500.00
300 Karpet ex. Lokal, Dinasty ( l = 4.00 m ) M¹ 90,750.00
301 Grass block 45 x 30 x 8 cm bh 10,340.00
302 Grass block 45 x 30 x 10 cm bh 12,650.00
303 Batu pinggir beton uk. 15 x 35 x 60 cm (K - 225) bh 38,720.00
304 Kansteen Pavingblock 6.15.39 bh 17,500.00
305 Kerb Type A 16.18.28.60. bh 30,100.00
306 Kerb Type B 16.18.40.60. bh 43,330.00
307 Kerb Type C (Jalan masuk) 16.18.15.60. bh 22,000.00
308 Kerb Type D (Tali air) 16.18.30.60. bh 30,800.00
309 Kerb Type L 16.18.30.60. bh 41,250.00
310 Kerb Type E 20.25.30.60. bh 46,200.00
311 Saluran air beton ( U-DITCH ) 20 x 50 tebal 4 cm bh 58,400.00
312 Saluran air beton ( U-DITCH ) 30 x 50 tebal 5 cm bh 80,400.00
313 Saluran air beton ( U-DITCH ) 40 x 50 tebal 6 cm bh 107,900.00
314 Homogenus Tile 60x60 Granito Palazzo Palermo Bh 115,500.00
315 Keramik Polish 40x40 ex. Roman golongan c Bh 17,833.33
316 Keramik 40x40 ex. Ikad SX marble Bh 8,500.00
317 Keramik 30x30 ex. Ikad GE marble Bh 4,000.00
318 Keramik 20x20 ex. Ikad SC kamar mandi Bh 1,880.00
Keramik dinding 40 x 20 motif ex ikad gol. A Bh 7,416.67
Keramik dinding 20 x 20 putih ex ikad gol. A Bh 3,640.00
Wall Cladding Batu Palem 20 x 40 Bh 14,166.67
Wall Caldding Batu Hitam 18x40 Bh 8,928.57
319 Saluran air beton ( U-DITCH ) 50 x 50 tebal 7 cm bh 146,400.00
No. Uraian Pekerjaan Satuan
Rp.
1 2 3
F. BAHAN SALURAN AIR KOTOR / BERSIH
315 Grevel beton 1/2 U 20 cm bh
316 Grevel beton 1/2 U 30 cm bh
317 Grevel beton 1/2 U 40 cm bh
318 Buis beton dia 20 cm - 1,00 m bh
319 Buis beton dia 30 cm - 1,00 m bh
320 Buis beton dia 40 cm - 1,00 m bh
321 Buis beton dia 50 cm - 0,50 m bh
322 Buis beton dia 60 cm - 0,50 m bh
323 Buis beton dia 80 cm - 0,50 m bh
324 Buis beton dia 100 cm - 0,50 m bh
325 Buis tanah dia 10 cm - 0,50 m stk
326 Pipa tanah dia 15 cm - 0,50 m stk
327 Buis tanah dia 20 cm - 0,50 m stk
328 Buis tanah dia 25 cm - 0,50 m stk
329 Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 0,80/1,20 M' M¹
330 Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 1,00/1,20 M' M¹
331 Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 1,20/1,20 M' M¹
332 Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 1,50/1,20 M' M¹
333 Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 2,00/1,20 M' M¹
334 Tangkai pengikat plat beton dari besi M¹
335 Pipa beton betulang Ø 60/100 cm M¹
336 Pipa beton betulang Ø 80/100 cm M¹
337 Pipa beton betulang Ø 100/100 cm M¹
338 Pipa beton betulang Ø 120/100 cm M¹
339 Pipa beton jeking pracetak Uk. 0,80/2,43 M M¹
340 Pipa beton jeking pracetak Uk. 1,10/2,43 M M¹
341 Pipa beton jeking pracetak Uk. 1,35/2,43 M M¹
342 Pipa beton jeking pracetak Uk. 1,50/2,43 M M¹
343 Pipa beton jeking pracetak Uk. 1,80/2,43 M M¹
344 Pipa beton jeking pracetak Uk. 2,00/2,43 M M¹
345 I j u k ( 20 kg / m2 ) kg
346 Pipa PVC. Pralon S-10 - dia 20 mm btg
347 Pipa PVC. Pralon S-10 - dia 25 mm btg
348 Pipa PVC. Pralon S-10 - dia 32 mm btg
349 Pipa PVC. Pralon S-10 - dia 40 mm btg
350 Pipa PVC. Pralon S-10 - dia 50 mm btg
351 Pipa PVC. Pralon S-12,5 - dia 63 mm btg
352 Pipa PVC. Pralon S-12,5 - dia 75 mm btg
353 Pipa PVC. Pralon S-12,5 - dia 90 mm btg
354 Pipa PVC. Pralon S-12,5 - dia 110 mm btg
355 Pipa PVC. Pralon S-12,5 - dia 140 mm btg
356 Pipa PVC. Pralon S-12,5 - dia 160 mm btg
357 Pipa PVC. Pralon S-12,5 - dia 200 mm btg
358 Pipa PVC. Pralon S-12,5 - dia 225 mm btg
359 Pipa PVC. Pralon S-12,5 - dia 250 mm btg
360 Pipa PVC. Pralon S-12,5 - dia 315 mm btg
361 Pipa PVC. Pralon S-12,5 - dia 355 mm btg
362 Pipa PVC. Pralon S-12,5 - dia 400 mm btg
363 Pipa PVC. Pralon S-12,5 - dia 500 mm btg
364 Pipa PVC. Pralon S-12,5 - dia 630 mm btg
365 Pipa pralon PVC. ( AW ) dia 1/2 ", sekulaitas Maspion (Abu-abu) btg
366 Pipa pralon PVC. ( AW ) dia 3/4 ", sekulaitas Maspion (Abu-abu) btg
367 Pipa pralon PVC. ( AW ) dia 1 ", sekulaitas Maspion ( Abu - abu ) btg
368 Pipa pralon PVC. ( AW ) dia 1 1/4 ", sekulaitas Maspion (Abu-abu) btg
369 Pipa pralon PVC. ( AW ) dia 1 1/2 ", sekulaitas Maspion (Abu-abu ) btg
370 Pipa pralon PVC. ( AW ) dia 2 ", sekulaitas Maspion ( Abu - abu ) btg
371 Pipa pralon PVC. ( AW ) dia 2 1/2 ", sekulaitas Maspion (Abu-abu) btg
372 Pipa pralon PVC. ( AW ) dia 3 ", sekulaitas Maspion ( Abu - abu ) btg
373 Pipa pralon PVC. ( AW ) dia 4 ", sekulaitas Maspion ( Abu - abu ) btg
374 Pipa pralon PVC. ( AW ) dia 6 ", sekulaitas Maspion ( Abu - abu ) btg
375 Pipa pralon PVC. ( D ) dia 1 1/2 ", sekulaitas Maspion btg
376 Pipa pralon PVC. ( D ) dia 2 ", sekulaitas Maspion btg
377 Pipa pralon PVC. ( D ) dia 2 1/2 ", sekulaitas Maspion btg
378 Pipa pralon PVC. ( D ) dia 3 ", sekulaitas Maspion btg
379 Pipa pralon PVC. ( D ) dia 4 ", sekulaitas Maspion btg
380 Pipa pralon PVC. ( D ) dia 6 ", sekulaitas Maspion btg
381 Pipa GIP. Medium klas A, dia 1" btg
382 Pipa GIP. Medium klas A, dia 1 1/4" btg
383 Pipa GIP. Medium klas A, dia 1 1/2 " btg
384 Pipa GIP. Medium klas A, dia 2 " btg
385 Pipa GIP. Medium klas B, dia 1/2 " btg
386 Pipa GIP. Medium klas B, dia 3/4 " btg
387 Pipa GIP. Medium klas B, dia 1 " btg
388 Pipa GIP. Medium klas B, dia 1 1/4 " btg
389 Pipa GIP. Medium klas B, dia 1 1/2 " btg
390 Pipa GIP. Medium klas B, dia 2 " btg
391 Pipa GIP. Medium klas B, dia 3 " btg
392 Pipa GIP. Medium klas B, dia 4 " btg
393 Pipa GIP. Medium klas B, dia 5 " btg
394 Pipa GIP. Medium klas B, dia 6 " btg
395 Pipa GIP. Medium klas B, dia 8 " btg
396 Pipa GI Medium Class Ø 1/2 " btg
397 Pipa GI Medium Class Ø 3/4 " btg
398 Pipa GI Medium Class Ø 1 " btg
399 Pipa GI Medium Class Ø 1 1/4" btg
400 Pipa GI Medium Class Ø 1 1/2" m3
401 Pipa GI Medium Class Ø 2 " btg
402 Pipa GI Medium Class Ø 2 1/2" btg
403 Pipa GI Medium Class Ø 3 " btg
404 Pipa GI Medium Class Ø 4 " btg
405 Pipa GI Medium Class Ø 5 " btg
406 Pipa GI Medium Class Ø 6 " btg
407 Pipa GI Medium Class Ø 8 " btg
408 Pipa GI Medium Class Ø 12" btg
409 Pipa hitam klas Medium dia 1 " btg
410 Pipa hitam klas Medium dia 1 1/4 " btg
411 Pipa hitam klas Medium dia 1 1/2 " btg
412 Pipa hitam klas Medium dia 2 " btg
413 Pipa hitam klas Medium dia 2 1/2 " btg
414 Pipa hitam klas Medium dia 3 " btg
415 Pipa hitam klas Medium dia 4 " btg
416 Pipa hitam klas Medium dia 5 " btg
417 Pipa hitam klas Medium dia 6 " btg
418 Tutup pipa 2" bh
419 Valpe & aksesories, dia 3/4 " ( KITZ ) bh
420 Valpe & aksesories, dia 1 " ( KITZ ) bh
421 Valpe & aksesories, dia 1 1/4 " ( KITZ ) bh
422 Valpe & aksesories, dia 1 1/2 " ( KITZ ) bh
423 Valpe & aksesories, dia 2 " ( KITZ ) bh
424 Pipa slang PE, dia 1/2 " M¹
425 Pipa slang PE, dia 3/4 " M¹
426 Pipa slang PE, dia 1 " M¹
427 Ground Reservoir 100 m3 unit
428 Ground Reservoir 200 m3 unit
429 Ground Reservoir 300 m3 unit
430 Ground Reservoir 500 m3 unit
431 Ground Reservoir 1000 m3 unit
432 Bend 90º all socket Ø 63 mm bh
433 Bend 90º all socket Ø 75 mm bh
434 Bend 90º all socket Ø 90 mm bh
435 Bend 90º all socket Ø 110 mm bh
436 Bend 90º all socket Ø 160 mm bh
437 Bend 90º all socket Ø 200 mm bh
438 Bend 90º all socket Ø 225 mm bh
439 Bend 90º all socket Ø 250 mm bh
440 Bend 90º all socket Ø 285 mm bh
441 Bend 90º all socket Ø 315 mm bh
442 Bend 45º all socket Ø 63 mm bh
443 Bend 45º all socket Ø 75 mm bh
444 Bend 45º all socket Ø 90 mm bh
445 Bend 45º all socket Ø 110 mm bh
446 Bend 45º all socket Ø 160 mm bh
447 Bend 45º all socket Ø 200 mm bh
448 Bend 45º all socket Ø 225 mm bh
449 Bend 45º all socket Ø 250 mm bh
450 Bend 45º all socket Ø 285 mm bh
451 Bend 45º all socket Ø 315 mm bh
452 Bend 22,5º all socket Ø 63 mm bh
453 Bend 22,5º all socket Ø 75 mm bh
454 Bend 22,5º all socket Ø 90 mm bh
455 Bend 22,5º all socket Ø 110 mm bh
456 Bend 22,5º all socket Ø 160 mm bh
457 Bend 22,5º all socket Ø 200 mm bh
458 Bend 22,5º all socket Ø 225 mm bh
459 Bend 22,5º all socket Ø 250 mm bh
460 Bend 22,5º all socket Ø 285 mm bh
461 Bend 22,5º all socket Ø 315 mm bh
462 Tee all Socket dia. 32 x 32 bh
463 Tee all Socket dia. 50 x 32 bh
464 Tee all Socket dia. 50 x 50 bh
465 Tee all Socket dia. 63 x 32 bh
466 Tee all Socket dia. 63 x 50 bh
467 Tee all Socket dia. 63 x 63 bh
468 Tee all Socket dia. 75 x 32 bh
469 Tee all Socket dia. 75 x 50 bh
470 Tee all Socket dia. 75 x 63 bh
471 Tee all Socket dia. 75 x 75 bh
472 Tee all Socket dia. 90 x 32 bh
473 Tee all Socket dia. 90 x 50 bh
474 Tee all Socket dia. 90 x 63 bh
475 Tee all Socket dia. 90 x 75 bh
476 Tee all Socket dia. 90 x 90 bh
477 Tee all Socket dia. 110 x 63 bh
478 Tee all Socket dia. 110 x 75 bh
479 Tee all Socket dia. 110 x 90 bh
480 Tee all Socket dia. 110 x 110 bh
481 Tee all Socket dia. 160 x 63 bh
482 Tee all Socket dia. 160 x 75 bh
483 Tee all Socket dia. 160 x 90 bh
484 Tee all Socket dia. 160 x 110 bh
485 Tee all Socket dia. 160 x 160 bh
486 Tee all Socket dia. 200 x 90 bh
487 Tee all Socket dia. 200 x 110 bh
488 Tee all Socket dia. 200 x 160 bh
489 Tee all Socket dia. 200 x 200 bh
490 Tee all Socket dia. 250 x 160 bh
491 Tee all Socket dia. 250 x 200 bh
492 Tee all Socket dia. 250 x 250 bh
493 Tee all Socket dia. 250 x 315 bh
494 Reducer all Socket dia. 50 x 32 bh
495 Reducer all Socket dia. 63 x 32 bh
496 Reducer all Socket dia. 63 x 50 bh
497 Reducer all Socket dia. 90 x 50 bh
498 Reducer all Socket dia. 90 x 63 bh
499 Reducer all Socket dia. 110 x 63 bh
500 Reducer all Socket dia. 110 x 90 bh
501 Reducer all Socket dia. 160 x 110 bh
502 Reducer all Socket dia. 200 x 160 bh
503 Reducer all Socket dia. 250 x 200 bh
504 Reducer all Socket dia. 250 x 315 bh
505 Flange Socket Ø 90 bh
506 Flange Socket Ø 110 bh
507 Flange Socket Ø 160 bh
508 Flange Socket Ø 200 bh
509 Flange Socket Ø 225 bh
510 Flange Socket Ø 250 bh
511 Flange Socket Ø 315 bh
512 Clam Saddle Ø 90 x 63 bh
513 Clam Saddle Ø 110 x 63 bh
514 Clam Saddle Ø 160 x 63 bh
515 Clam Saddle Ø 200 x 63 bh
516 Dop / Cap Ø 32 bh
517 Dop / Cap Ø 50 bh
518 Dop / Cap Ø 63 bh
519 Dop / Cap Ø 90 bh
520 Drat Socket Ø 32 mm bh
521 Drat Socket Ø 50 mm bh
522 Accessories GI Bend 90º all Flange dia 8 bh
523 Accessories GI Bend 90º all Flange dia 12 bh
524 Accessories GI Tee all Flange dia 8" x 8" bh
525 Accessories GI Tee all Flange dia 12" x 12" bh
526 Accessories GI Tee Flange dia 8" bh
527 Accessories GI Tee Flange dia 12" bh
528 Accessories GI Gate Valve dia 2" (all Flange) bh
529 Accessories GI Gate Valve dia 3" (all Flange) bh
530 Accessories GI Gate Valve dia 4" (all Flange) bh
531 Accessories GI Gate Valve dia 6" (all Flange) bh
532 Accessories GI Gate Valve dia 8" (all Flange) bh
533 Accessories GI Gate Valve dia 10" (all Flange) bh
534 Accessories GI Gate Valve dia 12" (all Flange) bh
J. BAHAN PERPIPAAN
648 Besi pipa untuk Hydrant BSP dia. 1" btg
649 Besi pipa untuk Hydrant BSP dia. 1,25" btg
650 Besi pipa untuk Hydrant BSP dia. 1,5" btg
651 Besi pipa untuk Hydrant BSP dia. 2" btg
652 Shower dengan Tiang bh
653 Shower tanpa Tiang bh
654 Kran tembok San Ei Ø 1/2 " bh
655 Kran tembok ITAP Ø 1/2 " bh
656 Kran bebek San Ei Ø 1/2 " bh
657 Kran bebek ITAP Ø 1/2 " bh
658 Kran panas / dingin Standar bh
659 Tempat sabun porselein bh
660 Floor drain San Ei bh
661 Floor drain Lokal bh
662 Wastafel lengkap + cermin bh
663 Wastafel bulat warna standar, lengkap bh
664 Wastafel lengkap + cermin, ex TOTO type L. 38 VI bh
665 Wastafel lengkap + cermin, ex TOTO type LW. 211 CJ bh
666 Wastafel lengkap + cermin, ex I N A type LW. 230 bh
667 Kloset jongkok porselen, warna bh
668 Kloset jongkok Standar putih porselen bh
669 Kloset jongkok teraso bh
670 Kloset duduk porselen TOTO, warna standard lengkap bh
671 Kloset duduk porselen TOTO, standard lengkap, warna tua bh
672 Kloset duduk porselen INA, standard lengkap, warna tua bh
673 Urinoir lengkap warna standar bh
674 Penyekat urinoir Porselein lbr
675 Kitchen zink stainless standar 1 lobang bh
676 Kitchen zink stainless Non standar 1 lobang bh
677 Kitchen zink stainless Non standard 2 lobang bh
678 Bak mandi fibre glass, uk. Kecil bh
679 Bak mandi fibre glass, uk. Besar bh
680 Bak mandi Teraso bh
681 Badkip TOTO, FB. 1500 / 1700 STD bh
Pipa Galvanis dia 1" m
Kloset jongkok ina bh
Kloset duduk ina bh
Jet shower onda putih bh
Shower + kran cabang set
kran air onda bh
floor drain stainles bh
washtafel tot0 set
kitchen sink set set
cermin 600x1200 m
Tandon bh
682 Bak cuci piring teraso bh
6.25
Harga Satuan No. Uraian Pekerjaan Satuan
Rp. Rp.
4 1 2 3
G. BAHAN LOGAM DAN BAHAN JADINYA
33,500.00 535 Baja Tulangan U-32, ulir kg
47,120.00 536 Baja Tulangan U-39, ulir kg
62,500.00 537 Baja Tulangan U-42, ulir kg
59,895.00 538 Baja Tulangan U-24, polos dia 12 kg
85,184.00 539 Baja Tulangan U-32, polos kg
120,500.00 540 Pagar BRC lengkap Tiang (Tanpa Pondasi) M²
124,310.00 541 Plat Bondex M²
162,890.00 542 Rangka baja Jembatan kg
172,230.00 543 Kuda-kuda rangka Baja Ringan (Zinkalum) M²
216,880.00 544 Kuda-kuda rangka Baja Ringan (Galvalum) M²
7,040.00 545 I W F ex Jepang kg
10,670.00 546 I W F ex DN SII kg
12,430.00 547 Besi profil ex DN- SII kg
17,600.00 548 Besi profil ex uar Negeri kg
1,524,600.00 549 Besi "C" Lip Chanel kg
2,144,800.00 550 Besi Hollow 4 x 4 tebal 0,2 mm m
2,900,800.00 551 Besi Hollow 4 x 2 tebal 0,8 mm btg
4,187,400.00 552 Ongkos Galvanis Besi kg
5,874,000.00 553 Besi Strip, uk. 3 x 30 mm x 6 m ( 4 Kg ) btg
7,500.00 Besi Strip, uk. 3 x 30 mm x 6 m ( 4 Kg ) kg
375,000.00 554 Kawat beton kg
450,000.00 555 Kawat duri ( 1 rol = 80 m' = 10 kg ) M¹
525,000.00 556 Kawat Pengikat M¹
575,000.00 557 Kawat Bronjong 4 mm kg
5,600,000.00 558 Kawat Bronjong 3 mm kg
6,160,000.00 559 Kawat Tembaga kg
6,776,000.00 560 Kawat las listrik kg
7,453,600.00 561 Kawat raam M²
8,198,960.00 562 Kawat nyamuk hijau M²
9,018,850.00 563 Kawat kassa / Harmonika, uk. 2.0 x 2.0 dia 2 mm M²
12,500.00 564 Kawat kassa / Harmonika, uk. 3.0 x 3.0 dia 2 mm M²
8,250.00 565 Kawat kassa / Harmonika, uk. 4.0 x 4.0 dia 2 mm M²
12,100.00 566 Kawat seng galvanis, uk. 3 mm kg
14,850.00 567 Kawat seng galvanis, uk. 4 mm kg
19,250.00 568 Kawat seng galvanis, uk. 5 mm kg
49,500.00 569 Seng BJLS 30, lebar 60 cm ( 1 rol = 50 m' ) M¹
60,500.00 570 Seng BJLS 30, lebar 90 cm ( 1 rol = 50 m' ) M¹
82,500.00 571 Seng plat BJLS 25 uk. 90 x 180 cm lbr
99,000.00 572 Seng plat BJLS 30 uk. 90 x 180 cm lbr
121,000.00 573 Seng gelombang BJLS 25 uk. 0.90 x 1.80 m lbr
150,150.00 574 Seng gelombang BJLS 30 uk. 0.90 x 1.80 m lbr
181,500.00 575 Wiremash Ø 8 mm M²
316,250.00 576 Wiremash Ø 6 mm M²
363,000.00 577 Plat besi tipis 1 mm kg
385,000.00 578 Plat besi tipis 0,5 mm kg
726,000.00 579 Plat besi tipis 2 mm - 5 mm kg
968,000.00 580 Plat besi tipis 5 mm - 10 mm kg
1,054,350.00 581 Plat besi tipis 10 mm ke atas kg
1,796,630.00 582 Almunium plat 0,25 mm ( 1.00 x 2.00 ) lbr
2,861,980.00 583 Almunium plat 0,30 mm ( 1.00 x 2.00 ) lbr
19,833.00 584 Almunium plat 0,40 mm ( 1.00 x 2.00 ) lbr
5,875.00 585 Almunium plat 0,50 mm ( 1.00 x 2.00 ) lbr
29,833.00 586 Almunium plat 0,60 mm ( 1.00 x 2.00 ) lbr
41,333.00 587 Almunium profil uk.3 " - 4.00 m ( bahan kusen ) btg
54,417.00 588 Almunium profil uk.4 " - 4.00 m ( bahan kusen ) btg
81,500.00 589 Almunium profil uk.3 " - 4.00 m ( bahan kusen ) btg
106,167.00 590 Almunium profil uk.4 " - 4.00 m ( bahan kusen ) btg
37,416.75 591 Almunium profil uk.3 " - 4.00 m ( bahan kusen ) btg
53,416.75 592 Almunium profil uk.4 " - 4.00 m ( bahan kusen ) btg
467,500.00 593 Almunium profil uk.3 " - ex. YKK Warna Coklat m
28,833.00 594 Almunium profil uk.4 " - 4.00 m ( bahan kusen ) btg
38,667.00 595 Alumunium daun pintu/Jendela M¹
55,833.00 596 Alumunium sheet M²
80,060.00 597 Almunium profil " T " - 4.00 m ( bahan rangka pla btg
113,020.00 598 Panel Sunscreen Aluminium Colourbond M²
305,833.00 599 Pintu Aluminium + kunci berikut kusen unit
225,000.00 600 Rolling door biasa, Type Grill aluminium M²
275,000.00 601 Rolling door biasa, Type Selat aluminium M²
363,000.00 602 Foldinggate M²
475,000.00 603 Rolling door biasa, Type one sheet unit
86,000.00 604 Railling tangga besi stainless M¹
120,000.00 605 Sealent Alumunium ke Kaca Tube
150,000.00 606 Sealent Alumunium ke dinding Tube
195,000.00 607 Lem kuning (Aibon) kg
250,000.00 608 Lem putih fox kg
320,000.00 609 Lem Vinil kg
550,000.00 Baja Ringan Canai Dingin C75.75 Taso bh
770,000.00 Baja Ringan Canai Dingin C75.75 Taso kg
780,000.00 Jasa las m
1,056,000.00 Kusen UPVC m
1,210,000.00 Pintu UPVC bh
119,680.00 Pintu Garasi Wina Sliding PB2A p3 set
168,960.00 Pintu Pj1 bh
237,050.00 Pintu P1 bh
284,460.00 Pintu Pj2 (Sliding Door Glass) bh
75,000.00 pintu p4 bh
686,400.00 Pintu Kamar Mandi p2 bh
490,800.00 610 Guard Rill m
1,111,180.00 I. BAHAN PAKU DAN MUR BAUD
1,657,700.00 625 Paku 1 s/d 2½ cm kg
2,155,010.00 626 Paku 4 s/d 7 cm kg
3,850,000.00 627 Paku uk. 8 s/d 12 cm kg
5,005,000.00 628 Paku beton 2 s/d 5 cm bh
7,007,000.00 629 Paku beton 7 cm bh
109,610.00 630 Paku beton 10 cm bh
132,500.00 631 Paku Ramset / dina bolt bh
150,000.00 632 Paku anti karat u/ genteng metal ( 35.00 m2 /kg ) kg
185,000.00 633 Paku 2" - 3" kg
350,460.00 633 Paku 2" - 5" kg
556,650.00 633 Paku seng kg
1,139,413.00 634 Paku kaca kg
2,250,000.00 635 Paku eternit kg
3,250,000.00 636 Paku triplex kg
15,070.00 637 Paku kait lengkap bh
71,500.00 638 Paku cacing kg
99,000.00 639 Paku gipsum anti karat ( 20.00 m2 / kg ) kg
137,500.00 640 Paku sekrup gypsum sunray 8x3 kg
181,500.00 641 Besi begel Kuda-kuda kg
302,500.00 642 Hak kait asbes 7 cm lengkap bh
3,850.00 643 Duk Angker kg
5,220.00 644 Angker Mur Baut dia. 19 mm panjang 60 cm bh
6,050.00 645 Mur Baut HTB dia. 10 mm s/d 16 mm (5 cm) bh
372,038,700.00 646 Mur Baut biasa dia. 10 mm s/d 16 mm (5 cm) bh
732,050,000.00 646 Paku uk. 5 - 10 cm kg
1,031,525,000.00 646 Paku uk. 5 - 12 cm kg
1,357,620,000.00 Paku Sekrup Atap bh
2,462,350,000.00 Paku sekrup fixer bh
69,520.00 engsel
124,410.00 647 Pixer dia. 12 cm s/d 20 cm bh
131,120.00
194,590.00
453,310.00
835,890.00
1,043,790.00
1,497,100.00
1,804,110.00
2,650,890.00
62,810.00
104,500.00
117,260.00
160,710.00
382,470.00
655,160.00
952,490.00
1,205,820.00
1,642,190.00
2,033,790.00
57,420.00
96,030.00
110,000.00
143,220.00
329,890.00
549,340.00
822,030.00
1,015,410.00
1,372,580.00
1,671,780.00
4,840.00
13,310.00
15,070.00
70,070.00
74,910.00
183,700.00
142,010.00
184,250.00
196,350.00
196,350.00
208,450.00
182,490.00
224,730.00
256,190.00
232,900.00
293,040.00
308,770.00
362,670.00
340,230.00
518,540.00
531,850.00
602,580.00
625,570.00
708,290.00
1,046,760.00
1,086,140.00
1,263,240.00
1,440,890.00
2,949,650.00
3,527,920.00
4,128,080.00
5,898,530.00
7,260.00
15,070.00
20,570.00
48,400.00
70,070.00
101,530.00
118,470.00
198,220.00
354,750.00
646,690.00
831,050.00
143,400.00
183,500.00
325,200.00
533,500.00
924,700.00
1,057,100.00
1,826,900.00
45,600.00
52,200.00
136,800.00
277,400.00
2,700.00
4,400.00
22,000.00
39,500.00
5,400.00
14,800.00
520,410.00
1,086,140.00
753,720.00
1,507,990.00
207,240.00
377,080.00
950,620.00
1,339,360.00
1,598,080.00
2,676,960.00
5,784,350.00
9,627,860.00
12,518,110.00

109,010.00
115,610.00
126,280.00
152,790.00
232,650.00
132,990.00
84,700.00
55,000.00
104,500.00
93,500.00
312,500.00
99,100.00
198,000.00
44,000.00
2,149,000.00
1,196,900.00
1,089,000.00
1,331,000.00
385,000.00
385,000.00
181,500.00
60,500.00
1,243,334.00
1,851,300.00
1,089,000.00
1,295,000.00
396,000.00
350,000.00
425,000.00
750,000.00
250,000.00
325,000.00
125,000.00
2,420,000.00
50,833.33
150,000.00
335,000.00
94,000.00
320,000.00
60,000.00
136,000.00
1,102,000.00
1,800,000.00
229,166.67 0.72
1,200,000.00
198,000.00
Harga Satuan No. Uraian Pekerjaan

4 1 2
H. BAHAN KACA
11,847.00 611 Kaca polos 2 mm
11,847.00 612 Kaca polos 3 mm
14,400.00 613 Kaca polos 5 mm
11,847.00 614 Kaca polos 8 mm
11,847.00 615 Kaca Buram 12 mm
209,000.00 616 Kaca raybend 5 mm
117,370.00 617 Kaca raybend 8 mm
22,660.00 618 Kaca es 3 mm
205,420.00 619 Kaca es 5 mm
215,050.00 620 Kaca patri ex lokal terpasang
16,635.00 621 Kaca patri ex Luar Negeri terpasang
14,980.00 622 Glass Block 20 x 20 cm (ex. Luar)
14,980.00 623 Glass Block 20 x 20 cm (ex. DN)
15,965.00 Jendela Nako 10 mm minimalis
14,980.00 slot
24,976.67
75,000.00 624 Kaca Cermin 5 mm
13,750.00 K. BAHAN PENUTUP ATAP
56,500.00 683 Atap plastik gelombang , uk. 0,80 x 1,80
13,420.43 684 Atap Fibreglass tipis, uk. 0,80 x 1,80
18,571.00 685 Atap Fibreglass tebal, uk. 0,80 x 1,80
5,000.00 686 Atap asbes gelombang , uk. 1.05 x 1.80 x 4 mm
2,500.00 687 Atap asbes gelombang , uk. 1.05 x 2.10 x 5 mm
11,310.00 688 Atap asbes gelombang , uk. 1.05 x 2.40 x 4 mm
12,040.00 689 Atap asbes gelombang , uk. 1.05 x 2.70 x 4 mm
41,910.00 690 Atap asbes gelombang , uk. 1.05 x 3.00 x 4 mm
60,000.00 691 Atap asbes gelombang , uk. 1.10 x 1.80 x 5 mm
14,660.00 692 Atap asbes gelombang , uk. 1.10 x 2.00 x 5 mm
27,225.00 693 Atap asbes gelombang , uk. 1.10 x 2.25 x 5 mm
30,250.00 694 Atap asbes gelombang , uk. 1.10 x 2.50 x 5 mm
21,120.00 695 Atap asbes gelombang , uk. 1.10 x 3.00 x 5 mm
20,900.00 696 Atap asbes gelombang , uk. 1.10 x 1.80 x 6 mm
17,500.00 697 Atap asbes gelombang , uk. 1.10 x 2.00 x 6 mm
20,000.00 698 Atap asbes gelombang , uk. 1.10 x 2.25 x 6 mm
20,000.00 699 Atap asbes gelombang , uk. 1.10 x 2.50 x 6 mm
42,350.00 700 Atap asbes gelombang , uk. 1.10 x 3.00 x 6 mm
57,475.00 701 Atap seng gelombang , uk. 0,80 x 1,80
51,425.00 702 Atap seng gelombang , uk. 1,05 x 2,40
66,550.00 703 Atap Genteng metal (Zinkalum) Polos tebal 0,5 mm
51,500.00 704 Atap Genteng metal (Galvalum) Polos tebal 0,5 mm
53,240.00 705 Atap Genteng metal (Zinkalum) Tekstur tebal 0,5 mm
41,800.00 706 Atap Genteng metal (Galvalum) Tekstur tebal 0,5 mm
36,850.00 707 Atap Genteng palentong pres bakar KW. I, ex Jatiwangi
15,400.00 708 Atap Genteng palentong pres Molen Oven KW. I, ex Jatiwangi
17,600.00 709 Atap Genteng Vlaams pres Molen Oven KW. I, ex Jatiwangi
14,760.00 710 Atap Genteng keramik warna Stand. KIA
14,760.00 711 Atap Genteng keramik warna Khusus. KIA
14,760.00 712 Atap Genteng bubung Pres bulat
42,350.00 713 Atap Genteng bubung Pres segi tiga
50,000.00 714 Atap Genteng kodok natural, ex jatiwangi
55,000.00 715 Atap Genteng kodok glazuur, ex jatiwangi
66,000.00 716 Atap Genteng palentong super / besar natural, ex Jatiwangi
82,500.00 717 Atap Genteng palentong super / besar glazuur, ex Jatiwangi
187,000.00 718 Atap Genteng beton natural, Rengganis
214,500.00 719 Atap Genteng beton warna 14,4 / m2
198,000.00 720 Atap Genteng beton Natural 14,4 / m2
220,000.00 721 Atap Genteng Morando natural ex Jatiwangi
209,000.00 722 Atap Genteng Morando glazuur ex Jatiwangi
352,000.00 723 Bubung genteng keramik warna Stand. KIA
117,500.00 724 Bubung genteng keramik warna Khusus. KIA
359,420.00 725 Bubung genteng metal Rainbow
49,720.00 726 Bubung genteng metal Sakura
75,000.00 727 Genteng bubung segi tiga / bulat, natural
66,000.00 728 Genteng bubung segi tiga / bulat, glazuur
97,750.00 729 Genteng bubung beton natural Rengganis
440,000.00 730 Genteng bubung beton warna Rengganis
158,120.00 731 Genteng bubung natural Morando
189,750.00 732 Genteng bubung glazuur Morando
225,000.00 733 Genteng bubung palentong besar natural
2,750,000.00 734 Genteng bubung palentong besar glazuur
825,000.00 735 Atap genteng asbes, uk. 0.85 x 1.15
30,000.00 736 Nok genteng asbes, pj. 1.15 m
30,000.00 737 Nok stel gelombang, 0.92 m
40,000.00 738 Nok stel gelombang, 1.10 m
19,250.00 739 Nok stel rata, 1.10 m
38,500.00 740 Nok stel rata, 0.92 m
85,500.00 741 Nok paten rata, 1.05 m
16,764.71 742 Nok paten gelombang, 0.92 m
230,000.00 743 Nok paten gelombang, 1.05 m
200,000.00 744 Nok paten gelombang, 1.10 m
210,000.00 745 Atap aluminium, ULR - 7 ( l = 920 mm x 0.50 mm )
11,400,000.00 746 Nok atap aluminium std.
5,988,300.00 747 Almunium foil, uk. 1.25 x 60.00 m
1,100,000.00 748 Almunium foil, uk. 2.50 x 60.00 m
1,800,000.00 749 Atap sirap kelas I ( 1 m2 = 80 lb )
900,000.00 750 Twinlight ( 2.10 x 11.80 )
900,000.00 751 Alumunium foil
346,800.00 Atap Onduline 95x200 cm
Atap Onduline 95x200 cm
19,250.00 752 Roof Mesh
17,210.00
17,210.00
400
650
800
8,125.00
24,750.00
18,500.00
17,500.00
22,600.00
21,500.00
19,250.00
19,250.00
1,200.00
55,000.00
22,750.00
12,250.00
19,250.00
2,500.00
20,990.00
49,500.00
16,500.00
10,450.00
17,500.00
17,500.00
283.33
283.33

8,250.00
Satuan Harga Satuan No.
Rp. Rp.
3 4 1
L.
M² 60,500.00 753
M² 94,380.00 387,500.00 754
M² 87,500.00 755
M² 211,200.00 756
M² 594,000.00 757
M² 192,500.00 758
M² 412,500.00 759
M² 140,800.00 760
M² 198,000.00 761
M² 1,650,000.00 762
M² 4,840,000.00 763
Bh 105,875.00 764
Bh 18,000.00 765
set 395,000.00 766
767
768
M² 165,000.00 769
770
lbr 34,938.00 771
lbr 48,520.00 772
lbr 98,010.00 773
lbr 41,740.00 774
lbr 58,080.00 775
lbr 54,450.00 776
lbr 61,100.00 777
lbr 66,666.00 778
lbr 27,170.00 779
lbr 30,850.00 780
lbr 32,670.00 781
lbr 35,690.00 782
lbr 50,820.00 783
lbr 32,300.00 784
lbr 34,480.00 785
lbr 37,800.00 786
lbr 41,380.00 787
lbr 66,550.00 788
lbr 60,000.00 789
lbr 67,500.00 790
lbr 120,000.00 791
lbr 140,000.00 792
lbr 175,000.00 793
lbr 190,000.00 794
bh 1,600.00 795
bh 2,000.00 796
bh 1,800.00 797
bh 6,500.00 798
bh 10,675.00 799
bh 5,220.00 800
bh 4,730.00 801
bh 2,500.00 802
bh 3,250.00 803
bh 3,500.00 804
bh 2,200.00 805
bh 4,500.00 806
m2 106,370.00 807
M² 100,210.00 808
bh 6,500.00 809
bh 8,250.00 810
bh 14,570.00 811
bh 26,150.00 812
bh 82,500.00 813
bh 104,500.00 814
bh 1,750.00 815
bh 2,200.00 816
bh 4,200.00 817
bh 5,250.00 818
bh 6,500.00 819
bh 8,030.00 820
bh 2,750.00 821
bh 5,000.00 822
lbr 25,000.00 823
bh 21,780.00 824
lbr 33,270.00 825
lbr 33,270.00 826
lbr 26,000.00 827
lbr 40,000.00 828
lbr 19,360.00 829
lbr 12,100.00 830
lbr 16,330.00 831
lbr 20,320.00 832
M² 124,900.00 833
M² 71,060.00 834
M² 3,500.00 835
M² 4,750.00 836
lbr 2,500.00 837
lbr 2,437,000.00 L eff. 838
roll 2,178,000.00 1.56 839
m 148,500.00 840
m^2 95,192.31 841
roll 2,178,000.00 842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
Uraian Pekerjaan Satuan Harga Satuan

2 3 4
BAHAN ELEKTRIKAL
Lampu pijar 25 watt s/d 100 watt bh 20,000.00
Lampu Neon TL 20 watt bh 75,000.00
Lampu Neon TL 40 watt bh 90,000.00
Down Light + SL 25 watt bh 192,500.00
Lampu Sirkel TL 20 watt lengkap bh 70,000.00
Lampu Mercury 80 watt bh 175,000.00
Lampu Mercury 250 watt bh 548,240.00
Lampu Mercury 400 watt bh 1,072,500.00
Lampu Sodium 250 watt bh 880,000.00
Lampu Sodium 400 watt bh 2,420,000.00
Lampu Taman + Tiang + Lampu 1 buah bh 423,500.00
Lampu Baret 30 cm + Neon bh 363,000.00
Lampu Neon Acrylik 2 x 40 watt bh 247,500.00
Reflektor (Mata kucing) bh 108,900.00
Jarum Penangkal Petir 16 bh 365,640.00
Kawat BC (Tembaga) kg 239,450.00
Pentanahan Penangkal Petir ttk 165,000.00
Pentanahan Panel ttk 121,000.00
Kabel power m' 6,050.00
Kabel Elektroda m' 9,350.00
Elektroda bh 33,000.00
Panel Elektroda unit 1,210,000.00
Box Lampu 2 Aspek Warning Light (Dia. 30 cm) bh 3,873,000.00
Control WL dengan Konfigurasi (Double Fisher) bh 8,520,700.00
Terminal Kabel bh 24,750.00
Armartur bh 275,000.00
Tiang Lurus btg 1,394,250.00
Tiang Lengkung untuk Tarffic Light bh 2,897,070.00
Box Lampu 2 Aspek untuk Traffic Light bh 1,874,510.00
Box Lampu 3 Aspek bh 2,811,820.00
Controler 4 phase 2 Pedestrian dan Box Luar Set 30,250,000.00
Tanki air fibre glass kap. 500 liter ex PINGUIN bh 792,000.00
Tanki air fibre glass kap. 1000 liter segi empat bh 1,467,070.00
Tanki air fibre glass kap. 1000 liter bulat bh 1,760,440.00
Tanki air fibre glass kap. 2000 liter bulat bh 5,868,280.00
Tanki air stainless kap. 1500 liter bh 3,712,500.00
Tanki air stainless kap. 500 liter bh 2,062,500.00
Tiang listrik khusus lengkung cabang dua Ø 5" 4" 3" panjang 10 M bh 4,284,000.00
Tiang listrik khusus tunggal Ø 5" 4" 3" panjang 10 M bh 3,894,000.00
Tiang listrik bentuk tunggal Ø 5" 4" 3" panjang 9 M bh 3,432,000.00
Tiang listrik khusus lurus cabang dua Ø 5" 4" 3" panjang 9 M bh 4,290,000.00
Stang armartur Ø 2½", 2" panjang 5 M bh 950,400.00
Stang armartur Ø 2" panjang 3 M bh 567,600.00
Armartur HRC 511 125 W / 220 V komplit "Phillips" bh 3,597,000.00
Armartur SRP 822 Son E 150 W / 220 V komplit "Sumico" bh 3,348,180.00
Armartur SRP 822 Son E 250 W / 220 V komplit "Sumico" bh 1,643,400.00
Armartur SRG Full R Son E 150 W / 220 V komplit "Sumico" bh 1,914,000.00
Armartur SRG Full R Son E 250 W / 220 V komplit "Sumico" bh 1,090,800.00
Armartur SRG Full R Son E 70 W / 220 V komplit "Sumico" bh 1,452,000.00
Armartur HRG Full R Hpin E 150 W / 220 V komplit "Sumico" bh 1,452,000.00
Armartur HRG Full R Hpin E 250 W / 220 V komplit "Sumico" bh 726,000.00
Armartur CLS 15 70 W HPS / 220 V komplit "Creation" bh 2,112,000.00
Armartur CLS 25 70 W HPS / 220 V komplit "Creation" bh 290,400.00
Armartur CLS 25 150 W HPS / 220 V komplit "Creation" bh 3,564,000.00
Armartur CLS 25 250 W HPS / 220 V komplit "Creation" bh 4,224,000.00
Armartur CLS 25 150/100 W HPS / 220 V komplit "Creation" bh 5,016,000.00
Armartur CLS 25 150/150 W HPS / 220 V komplit "Creation" bh 5,544,000.00
Armartur CLS 40 400/250 W HPS / 220 V komplit "Creation" bh 6,336,000.00
Armartur CLS 40 400 W HPS / 220 V komplit "Creation" bh 5,016,000.00
Armartur CLS 30 250 W MH / 220 V komplit "Creation" bh 3,696,000.00
Armartur CLS 40 400 W MH / 220 V komplit "Creation" bh 4,620,000.00
Armartur ERL8 2x TL 18 W 54 / 220 V komplit "Creation" bh 924,000.00
Armartur CLS 15 LHE 46 W / 220 V komplit "Creation" bh 1,056,000.00
Armartur M2AR HPS/MH 70 W / 220 V komplit "GE" bh 2,435,400.00
Armartur M2AR HPS/MH 150 W / 220 V komplit "GE" bh 2,654,190.00
Armartur M2AR HPS/MH 250 W / 220 V komplit "GE" bh 2,851,530.00
Armartur COR HPS/MH 150 W / 220 V komplit "GE" bh 3,419,460.00
Armartur COR HPS/MH 250 W / 220 V komplit "GE" bh 3,619,770.00
Armartur COR HPS/MH 400 W / 220 V komplit "GE" bh 3,876,840.00
Armartur COR HPS/MH 150-100 W / 220 V (Durning) komplit "GE" bh 3,745,930.00
Armartur COR HPS/MH 250-150 W / 220 V (Durning) komplit "GE" bh 4,078,240.00
Armartur COR HPS/MH 400-250 W / 220 V (Durning) komplit "GE" bh 4,508,230.00
Armartur SVRA HPS/MH 175 W / 220 V komplit "GE" bh 8,316,000.00
Armartur OLY HPS/MH 250 W / 220 V komplit "GE" bh 3,597,000.00
Armartur OLY HPS/MH 150 W / 220 V komplit "GE" bh 3,399,000.00
Armartur OLY HPS/MH 150-100 W / 220 V (Durning) komplit "GE" bh 3,652,110.00
Armartur OLY HPS/MH 250-150 W / 220 V (Durning) komplit "GE" bh 3,993,000.00
Armartur OLY HPS/MH 400-250 W / 220 V (Durning) komplit "GE" bh 4,448,400.00
Armartur SGN HPS/MH 400 W / 220 V komplit "GE" bh 3,803,250.00
Armartur SGN HPS/MH 250 W / 220 V komplit "GE" bh 3,465,000.00
Armartur SGN HPS/MH 150 W / 220 V komplit "GE" bh 3,267,000.00
Armartur HPS 150-100 W / 220 V (Durning) komplit "GE" bh 3,531,000.00
Armartur HPS 250-150 W / 220 V (Durning) komplit "GE" bh 3,894,000.00
Armartur HPS 400-250 W / 220 V (Durning) komplit "GE" bh 4,356,000.00
Armartur DURA HPS 70 W / 220 V komplit "GE" bh 2,211,000.00
Armartur DURA HPS 150 W / 220 V komplit "GE" bh 2,381,280.00
Armartur PF1K HPS 1000 W / 220 V komplit "GE" bh 13,695,000.00
Armartur PF1K MH 1000 W / 220 V komplit "GE" bh 14,602,500.00
Armartur MH 2000 W / 220 V komplit "GE" bh 23,100,000.00
Armartur MH 1000 W / 220 V komplit "GE" bh 20,790,000.00
Armartur NR-83 SON 100 W / 220 V komplit "NIKO" bh 1,320,000.00
Armartur NR-83 SON 150 W / 220 V komplit "NIKO" bh 1,421,640.00
Armartur NR-83 HPLN 250 W / 220 V komplit "NIKO" bh 1,421,640.00
Armartur NR-83 HPLN 100 W / 220 V komplit "NIKO" bh 1,523,280.00
Armartur NR-83 HPLN 150 W / 220 V komplit "NIKO" bh 1,015,080.00
Armartur NR-98A HPLN 125 W / 220 V komplit "NIKO" bh 1,421,640.00
Armartur NR-98A SON 70 W / 220 V komplit "NIKO" bh 1,523,280.00
Armartur NR-98B SON 150 W / 220 V komplit "NIKO" bh 221,640.00
Armartur NR-98B SON 250 W / 220 V komplit "NIKO" bh 1,523,280.00
Armartur NR-98B HPLN 125 W / 220 V komplit "NIKO" bh 1,421,640.00
Armartur NR-791 SON 150 W / 220 V komplit "NIKO" bh 1,726,560.00
Armartur NR-791 SON 250 W / 220 V komplit "NIKO" bh 1,827,540.00
Armartur NR-791 SON 400 W / 220 V komplit "NIKO" bh 1,929,180.00
Armartur NR-791 MH-T 250 W / 220 V komplit "NIKO" bh 1,685,640.00
Armartur NR-793 HPI 400 W / 220 V komplit "NIKO" bh 2,956,920.00
Armartur NR-793 SON-T 400 W / 220 V komplit "NIKO" bh 2,843,280.00
Armartur NR-794 SON 400 W / 220 V komplit "NIKO" bh 2,030,820.00
Armartur NR-794 HPI 400 W / 220 V komplit "NIKO" bh 2,132,460.00
Armartur NR-798 SON-I 70 W / 220 V komplit "NIKO" bh 1,218,360.00
Armartur NR-822 SON 250 W / 220 V komplit "NIKO" bh 1,827,540.00
Armartur NR-822 SON 400 W / 220 V komplit "NIKO" bh 1,929,180.00
Armartur NR-822 HPLN 250 W / 220 V komplit "NIKO" bh 1,631,880.00
Armartur NR-822 HPLN 400 W / 220 V komplit "NIKO" bh 1,776,720.00
Armartur NR-921 SON-T 250 W / 220 V komplit "NIKO" bh 3,350,820.00
Armartur NR-921 SON-T 400 W / 220 V komplit "NIKO" bh 3,452,460.00
Armartur NR-921 HPI-T 250 W / 220 V komplit "NIKO" bh 3,452,460.00
Armartur NR-921 HPI-T 400 W / 220 V komplit "NIKO" bh 3,554,100.00
Armartur NR-419 SON 150 W / 220 V komplit "NIKO" bh 2,172,720.00
Armartur NL-127 HPI-T 1000 W / 220 V komplit "NIKO" bh 5,584,920.00
Armartur RL ARTO C SON 250 W / 220 V komplit "ARTOLITE" bh 1,864,500.00
Armartur RL ARTO C HPLN 250 W / 220 V komplit "ARTOLITE" bh 1,648,740.00
Armarture HRC 511-LHE 85W / 220 V komplit bh 990,000.00
Armarture HRC 510-LHE 45W / 220 V komplit bh 726,000.00
Armarture HRC 504-LHE 85W / 220 V komplit bh 924,000.00
Armarture HRC 504-LHE 45W / 220 V komplit bh 660,000.00
Armarture SRP 822-LHE 85W / 220 V komplit bh 1,056,000.00
Armarture GLOBAL 1 70W / 220 V komplit "NORDEX" bh 2,211,000.00
Armarture GLOBAL 1 150W / 220 V komplit "NORDEX" bh 2,376,000.00
Armarture GLOBAL 2 150W / 220 V komplit "NORDEX" bh 2,422,000.00
Armarture GLOBAL 2 250W / 220 V komplit "NORDEX" bh 2,540,000.00
Armarture GLOBAL 2 400W / 220 V komplit "NORDEX" bh 2,831,400.00
Armarture GLOBAL 2 Bilevel 150-100 W / 220 V komplit "NORDEX" bh 3,524,400.00
Armarture GLOBAL 2 Bilevel 250-150 W / 220 V komplit "NORDEX" bh 3,861,000.00
Armarture GLOBAL 2 Bilevel 400-250 W / 220 V komplit "NORDEX" bh 4,224,000.00
Armarture ANVA 2 150 W / 220 V komplit "NORDEX" bh 3,828,000.00
Armarture ANVA 2 250 W / 220 V komplit "NORDEX" bh 3,583,800.00
Armarture ANVA 2 400 W / 220 V komplit "NORDEX" bh 3,372,600.00
Armarture ANVA 2 Bilevel 150-100 W / 220 V komplit "NORDEX" bh 3,707,100.00
Kabel NYFGBY 4x10 qmm (Supreme) rol 128,700.00
Kabel NYFGBY 4x25 qmm (Supreme) rol 229,940.00
Kabel NYM 3x2,5 qmm "Prime / Eterna" M¹ 8,340.00
Kabel TIC 2x10 qmm "SPLN" Lokal M¹ 5,940.00
Kabel TIC 4x10 qmm "SPLN" Lokal M¹ 11,880.00
Kabel NYY 3x4 qmm "Prime / Eterna" M¹ 34,320.00
Kabel NYY 4x10 qmm "Prime / Eterna" M¹ 61,920.00
Photo Cell 10 A "Celecal" bh 138,600.00
Photo Cell 6 A "Celecal" bh 116,700.00
Photo Cell 3 A "Celecal" bh 73,500.00
Photo Cell 6 A "NIKO" bh 132,000.00
Time Switch "NS A Setur" bh 396,000.00
Time Switch 16 A 220/50 Hz 12 Hours "NIKO" bh 386,760.00
Time Switch Diming Esco I bh 186,120.00
Kontaktor 100 A "Mitsubishi" bh 844,800.00
Kontaktor 125 A "Mitsubishi" bh 1,128,600.00
Kontaktor 3 Phase "NIKO" bh 70,450.00
Widge bh 19,800.00
M C B 10 A bh 38,225.00
M C B 16 A bh 38,940.00
M C B 20 A bh 51,350.00
M C B Domae 1 phase 25 A bh 47,520.00
M C B 50 A bh 126,060.00
Ballast BHL 250W / 220V "Phillips" bh 273,240.00
Ballast BHL 125W / 220V "Phillips" bh 158,870.00
Ballast BHL 80W / 220V "Phillips" bh 138,120.00
Ballast BSN 150W / 220V "Phillips" bh 207,970.00
Ballast BSN 250W / 220V "Phillips" bh 302,700.00
Ballast BSN 400W / 220V "Phillips" bh 588,770.00
Ballast HC 200 NG 70W / 220V "Creation" bh 184,800.00
Ballast HC 200 NG 150W / 220V "Creation" bh 231,000.00
Ballast HC 200 NG 250W / 220V "Creation" bh 356,400.00
Ballast HC 200 NG 400W / 220V "Creation" bh 448,800.00
Ballast HC 22050 NG 150W / 220V "Creation" bh 858,000.00
Ballast HC 22050 NG 250W / 220V "Creation" bh 897,600.00
Ballast HC 22050 NG 400W / 220V "Creation" bh 937,200.00
Ballast MBS 70W / 220V "GE" bh 205,390.00
Ballast MBS 150W / 220V "GE" bh 380,950.00
Ballast MBS 250W / 220V "GE" bh 458,700.00
Ballast MBS 400W / 220V "GE" bh 603,100.00
Ballast MBS 1000W / 220V "GE" bh 1,452,000.00
Ballast MBS BI-Level 150-100W / 220V "GE" bh 575,520.00
Ballast MBS BI-Level 250-150W / 220V "GE" bh 676,820.00
Ballast MBS BI-Level 400-250W / 220V "GE" bh 790,410.00
Ballast BSN 70W / 220V "NIKO" bh 132,000.00
Ballast BSN 150W / 220V "NIKO" bh 198,000.00
Ballast BSN 250W / 220V "NIKO" bh 213,180.00
Ballast BSN 400W / 220V "NIKO" bh 330,000.00
Ballast BSN 1000W / 220V "NIKO" bh 1,188,000.00
Ballast BHL 80W / 220V "NIKO" bh 112,200.00
Ballast BHL 125W / 220V "NIKO" bh 132,000.00
Ballast BHL 250W / 220V "NIKO" bh 198,000.00
Ballast BHL 400W / 220V "NIKO" bh 213,180.00
Ballast BMH 70W / 220V "NIKO" bh 122,100.00
Ballast BMH 150W / 220V "NIKO" bh 182,820.00
Ballast BMH 250W / 220V "NIKO" bh 198,000.00
Ballast BMH 400W / 220V "NIKO" bh 253,440.00
Ballast BMH 1000W / 220V "NIKO" bh 1,116,720.00
Ballast Dimming SON 250W/220V BSD 250 L 4061 TS "PHILLIPS" bh 553,210.00
Ballast Dimming SON 150W/220V BSD 250 L 4061 TS "PHILLIPS" bh 464,640.00
Ballast HPS NORDEX 70W / 220V 50 Hz "NAMH" bh 198,000.00
Ballast HPS NORDEX 150W / 220V 50 Hz "NAMH" bh 363,000.00
Ballast HPS NORDEX 250W / 220V 50 Hz "NAMH" bh 451,440.00
Ballast HPS NORDEX 400W / 220V 50 Hz "NAMH" bh 594,520.00
Ballast HPS NORDEX 150-100W / 220V 50 Hz bilevel "NAMH" bh 574,200.00
Ballast HPS NORDEX 250-150W / 220V 50 Hz bilevel "NAMH" bh 671,880.00
Ballast HPS NORDEX 400-100W / 220V 50 Hz bilevel "NAMH" bh 788,830.00
Lampu SON 400W/220V "PHILLIPS" bh 175,560.00
Lampu SON 250W/220V "PHILLIPS" bh 143,220.00
Lampu SON 150W/220V "PHILLIPS" bh 124,080.00
Lampu HPL 250W/220V "PHILLIPS" bh 65,340.00
Lampu HPL 125W/220V "PHILLIPS" bh 29,700.00
Lampu HPL 80W/220V "PHILLIPS" bh 29,700.00
Lampu LHE 40W/220V "HITACHI" bh 133,980.00
Lampu LHE 65W/220V "SINYOKU" bh 191,400.00
Lampu LHE 85W/220V "SINYOKU" bh 264,000.00
Lampu HC/NG 70W/220V "CREATION" bh 224,400.00
Lampu HC/NG 150W/220V "CREATION" bh 244,200.00
Lampu HC/NG 250W/220V "CREATION" bh 257,400.00
Lampu HC/NG 400W/220V "CREATION" bh 277,200.00
Lampu LU 70W/220V (Internal Ignitor) Komplit "GE" bh 192,880.00
Lampu LU 150W/220V (Internal Ignitor) Komplit "GE" bh 229,890.00
Lampu LU 250W/220V (Internal Ignitor) Komplit "GE" bh 262,180.00
Lampu LU 400W/220V (Internal Ignitor) Komplit "GE" bh 297,750.00
Lampu LU 1000W/220V (Internal Ignitor) Komplit "GE" bh 1,315,870.00
Lampu Mercury E27 80W / 220V Komplit "NIKO" bh 60,720.00
Lampu Mercury E27 125W / 220V Komplit "NIKO" bh 66,000.00
Lampu Mercury E40 250W / 220V Komplit "NIKO" bh 81,180.00
Lampu Mercury E40 400W / 220V Komplit "NIKO" bh 101,500.00
Lampu Mercury Blanded E27 160W / 220V Komplit "NIKO" bh 186,000.00
Lampu Mercury Blanded E40 250W / 220V Komplit "NIKO" bh 81,180.00
Lampu Mercury Blanded E40 500W / 220V Komplit "NIKO" bh 101,500.00
Lampu Sodium Self-Ignited E27 70W / 220V Komplit "NIKO" bh 132,000.00
Lampu Sodium Self-Ignited E40 150W / 220V Komplit "NIKO" bh 162,360.00
Lampu Sodium Tubular 170W / 220V Komplit "NIKO" bh 132,000.00
Lampu Sodium Tubular 100W / 220V Komplit "NIKO" bh 152,460.00
Lampu Sodium Tubular 150W / 220V Komplit "NIKO" bh 162,360.00
Lampu Sodium Tubular 250W / 220V Komplit "NIKO" bh 182,820.00
Lampu Sodium Tubular 400W / 220V Komplit "NIKO" bh 203,280.00
Lampu Sodium Tubular 1000W / 220V Komplit "NIKO" bh 1,117,380.00
Lampu Metal Hilide 70W / 220V Komplit "NIKO" bh 182,820.00
Lampu Metal Hilide 100W / 220V Komplit "NIKO" bh 182,820.00
Lampu Metal Hilide 150W / 220V Komplit "NIKO" bh 203,940.00
Lampu Metal Hilide 250W / 220V Komplit "NIKO" bh 223,740.00
Lampu Metal Hilide 400W / 220V Komplit "NIKO" bh 243,540.00
Lampu Metal Hilide 1000W / 220V Komplit "NIKO" bh 1,218,360.00
Ignator "PHILLIPS" bh 68,640.00
Ignator HCIG-NG 70W "CREATION" bh 85,800.00
Ignator HCIG-NG 150W "CREATION" bh 85,800.00
Ignator HCIG-NG 250W "CREATION" bh 85,800.00
Ignator HCIG-NG 400W "CREATION" bh 85,800.00
Ignator MSI 70-400W "GE" bh 260,480.00
Ignator CD-8A For Sodium 70-150W "NIKO" bh 66,000.00
Ignator SN-58 For Sodium 70-400W "NIKO" bh 79,200.00
Ignator CD-8C For Sodium 1000W "NIKO" bh 92,400.00
Ignator CD-8B Metal Hilide 1000W "NIKO" bh 92,400.00
Ignator Dimming SU41 s "PHILLIPS" bh 123,280.00
Kapasitor "PHILLIPS" bh 51,480.00
Kapasitor HCCC-12 70W "CREATION" bh 43,560.00
Kapasitor HCCC-18 150W "CREATION" bh 59,400.00
Kapasitor HCCC-22 250W "CREATION" bh 85,800.00
Kapasitor HCCC-50 400W "CREATION" bh 132,000.00
Kapasitor / Ignator 12 Uf 70W "GE" bh 111,310.00
Kapasitor / Ignator 18 Uf 150W "GE" bh 130,580.00
Kapasitor / Ignator 32 Uf 250W "GE" bh 178,110.00
Kapasitor / Ignator 50 Uf 400W "GE" bh 238,220.00
Kapasitor / Ignator HPS NORDEX 12 Uf 70W "GE" 50Hz bh 110,220.00
Kapasitor / Ignator HPS NORDEX 18 Uf 150W "GE" 50Hz bh 133,320.00
Kapasitor / Ignator HPS NORDEX 32 Uf 250W "GE" 50Hz bh 174,900.00
Kapasitor / Ignator HPS NORDEX 50 Uf 400W "GE" 50Hz bh 231,000.00
Kapasitor 10 Uf "NIKO" bh 46,200.00
Kapasitor 20 Uf "NIKO" bh 87,780.00
Kapasitor 30 Uf "NIKO" bh 120,780.00
Kapasitor 50 Uf "NIKO" bh 153,780.00
Tap Konektor "Lokal" bh 16,500.00
Box panel ukuran 20 x 40 x 60 cm bh 792,120.00
Terminal kabel No. 16 "Ligrand / Licon " bh 48,180.00
Terminal kabel No. 10 "Ligrand / Licon " bh 31,020.00
Klem Stang komplit bh 363,000.00
Isolasi besar bh 7,520.00
Avometer bh 396,000.00
Tespen bh 10,800.00
Obeng besar Daun (-) bh 29,040.00
Obeng besar Daun (+) bh 29,040.00
Tang besar bh 22,500.00
Tang Ampere bh 415,800.00
Lampu LED TL Philips 16 w bh 70,000.00
Lampu LED Philips 5w bh 30,200.00
Pipa Listrik 5/8" btg 6,500.00
T Dus bh 6,000.00
L Bow 5/8" bh 1,100.00
Kabel LAN Belden UTP cat 56 m 5,500.00
Connector AMP UTP cat5e bh 3,500.00
Klem Kabel Shukaku 10mm bh 200.00
Stop Kontak Panasonic WESJP1121MWS bh 34,830.00
Saklar Tunggal Schneider Neo Horizonal bh 46,000.00
Saklar Ganda Schneider Neo Horizonal bh 69,250.00
Stop Kontak Antena TV Broco bh 36,000.00
Stop Kontak Telepon Schneider Leona bh 34,900.00
Fitting Lampu Downlight Philips 4" bh 45,900.00
Kap Housing Lampu LED TL Philips bh 40,000.00
Las Doof 2.5-4 mm bh 275.00
Lampu Senter Hologen bh 264,000.00
No. Uraian Pekerjaan Satuan
Rp.
1 2 3
M. BAHAN ALAT PENGGANTUNG / KUNCI
1038 Kunci Silinder untuk pintu Almunium setara ALPHA bh
1039 Kunci Silinder untuk pintu Almunium setara AKN bh
1040 Tarikan pintu aluminium bh
1041 Handle pintu aluminium bh
Handle 2 bh
Handle 1 set
Kunci Pintu set
kait angin bh
Slot Jendela bh
daun jendela Pj1=Pj2 bh
acc ls
1042 Handle pintu type besar psg
1043 Rel Handerson lengkap bh
1044 Rel Marathon 1 Pintu Bh
1045 Kunci slaag Silinder asli Type 210 s/d 226 bh
1046 Kunci slaag Anchor asli Bh
1047 Kunci pintu Union/Royal Type besar bh
1048 Kunci pintu Union/Royal Type kecil bh
1049 Kunci pintu Cap KUDA TERBANG Type besar bh
1050 Kunci pintu Cap KUDA TERBANG Type kecil bh
1051 Kunci pintu SES Type besar bh
1052 Kunci pintu SES Type kecil bh
1053 Kunci pintu KM/WC, ALPHA bh
1054 Grendel tanam pintu ganda ( espagnolet ) bh
1055 Grendel jendela biasa 15 cm bh
1056 Grendel jendela biasa 5 cm bh
1057 Hak angin kait biasa bh
1058 Hak angin jendela antik bh
1059 Hak angin stainless bh
1060 Jendela Nako Lengkap Tralis 1 Daun Bh
1061 Grendel pintu biasa ( selot ) bh
1062 Sloot Pintu berikut rantai bh
1063 Sloot Jendela Tunggal bh
1064 Engsel pintu solid 4" psg
1065 Engsel pintu solid 3" psg
1066 Engsel jendela biasa psg
1067 Engsel angin psg
1068 Tarikan Lemari rata-rata
1069 Engsel pintu Almunium ( Floor Hinge ), ex DORMA, uk. Pintu Standard bh
1070 Engsel pintu Almunium ( Floor Hinge ), ex AKN, uk. Pintu Standard bh
1071 Grendel jendela ( spring knip ) bh
1072 Kunci pintu Lemari bh
1073 Door stop type 013 / GP bh
1074 Door stop type 013 / S bh
1075 Door stop type 014 / US 3 bh
1076 Kunci tanam bh
Rel Pintu Henderson Track 4 m set
Rel Pintu Henderson Track 4 m set
Rel Pagar set
Rel pintu sorong pintu set
1076 Door closer bh
O. BAHAN PENGISAP AIR SUMUR DALAM
1092 Pompa Kodok unit
1093 Pompa Tangan Lokal unit
1094 Pompa Tangan Luar unit
1095 Mesin Pompa Air 100 watt unit
1096 esin Pompa Air 150 watt unit
1097 Pompa Jet pump 250 watt Unit
1098 Pompa jetpump 450 watt unit
1099 Pompa Submersible pump, Kap. 150 liter/menit 3 KW unit
1100 Gear Pump Kap. 60 liter / menit unit
1101 Deep Well dengan kelengkapannya Kap. 150 liter/menit unit
1102 Hand Oil Pump unit
1103 Gear Pump Kap. 60 liter / menit unit
1104 Water Heather unit
Harga Satuan No. Uraian Pekerjaan Satuan Harga Satuan
Rp.
4 1 2 3 4
R. BETON PRACETAK
330,000.00 I. PANEL DINDING BETON BERONGGA ( WALL )
396,000.00 1 Type 100.05.8 M² 196,920.00
225,000.00 II. HALF SLAB
330,000.00 1 Type 80.05.5 M² 130,310.00
211,700.00 III Biaya Pasang ( siang )
125,000.00 1 Biaya Pasang 120 M² 13,910.00
50,000.00 2 Biaya Pasang 150 M² 14,640.00
23,500.00 3 Biaya Pasang 200 M² 15,370.00
29,000.00 IV Biaya Pasang ( malam )
412,500.00 1 Biaya Pasang 120 M² 27,830.00
48,000.00 2 Biaya Pasang 150 M² 28,550.00
264,000.00 3 Biaya Pasang 200 M² 29,280.00
247,500.00 V PAGAR BETON PRACETAK
203,500.00 1 Panel 240.40.5 lbr 73,200.00
175,000.00 VI H - BEAM
150,000.00 1 260 btg 177,200.00
90,000.00 2 300 btg 204,970.00
75,000.00 3 340 btg 232,800.00
80,000.00 4 360 btg 246,710.00
65,000.00 5 380 btg 260,630.00
225,000.00 6 420 btg 288,460.00
165,000.00 VII PONDASI STRAUSZ
125,000.00 1 Dia 40 - 150 ttk 239,390.00
45,000.00 2 Dia 40 - 200 ttk 318,470.00
15,000.00 VIII PONDASI BATU KALI
6,500.00 1 Menerus 1 Pc : 4 Psr M³ 649,772.00
12,500.00 IX. BIAYA PASANG
17,500.00 1 Biaya pasang kondisi 1 M² 14,640.00
22,500.00 2 Biaya pasang kondisi 2 M² 17,760.00
35,000.00 3 Biaya pasang kondisi 3 M² 19,360.00
10,000.00 S TIANG PANCANG ( PILE )
12,500.00 1 TRIPLE 28 ( D 16 ) M¹ 111,320.00
10,000.00 2 TRIPLE 32 ( D 19 ) M¹ 137,630.00
60,000.00 3 TRIPLE 28 ( D 13 ) M¹ 98,130.00
42,000.00 4 TRIPLE 32 ( D 16 ) M¹ 130,310.00
17,500.00 5 SQUARE 20 ( D 13 ) M¹ 106,900.00
35,750.00 6 SQUARE 25 ( D 16 ) M¹ 169,880.00
45,000.00 T. LAIN-LAIN
850,000.00 1 Karbit M¹ 15,000.00
700,000.00 2 Ayakan Sortiran bh 46,970.00
15,000.00 3 Air PDAM M³ 8,000.00
17,500.00 4 Happa M² 35,200.00
35,000.00 5 Waring M² 29,370.00
26,400.00 6 Hi-Blow (60 titik) bh 1,920,500.00
19,500.00 7 Hi-Blow (100 titik) bh 2,667,400.00
101650 8 Mob/Demob. Dalam kota unit 2,818,390.00
698000
1838213.4677 10534.1746
776525 10.5341746
175000 2.63354365
325,000.00 4.45
1.1125
275,000.00
385,000.00
968,000.00
1,760,000.00
2,475,000.00
6,050,000.00
8,250,000.00
32,432,000.00
18,532,600.00
269,820,200.00
5,560,700.00
18,532,600.00
234,740.00
No. Uraian Pekerjaan Satuan Harga Satuan (Rp)

1 2 3 4
U. UPAH KERJA
1 Pekerja Oh 95,600.00
2 Tukang Gali Oh 109,300.00
3 Tukang Batu Oh 109,300.00
4 Tukang Kayu Oh 109,300.00
5 Tukang Cat / Pelitur Oh 109,300.00
6 Tukang Besi Beton Oh 109,300.00
7 Tukang Besi Profil Oh 109,300.00
8 Tukang Besi Konstruksi Oh 109,300.00
9 Tukang Allumunium Oh 109,300.00
10 Tukang Las Oh 109,300.00
11 Tukang Las Konstruksi Oh 109,300.00
12 Tukang Pipa Oh 109,300.00
13 Tukang Vibrator Oh 109,300.00
14 Tukang Erection Oh 109,300.00
15 Tukang Listrik Oh 109,300.00
16 Operator Alat Berat Oh 131,000.00
17 Operator Crane Oh 131,000.00
18 Operator Oh 131,000.00
19 Pembantu Operator Crane Oh 95,600.00
20 Pembantu Tukang Oh 95,600.00
21 Kepala Tukang Oh 120,000.00
22 Mandor Oh 131,000.00
A Pekerjaan Persiapan
A.1 Pekerjaan Pembersihan Lapangan
A.2 Pembuatan Pagar Sementara dari Seng Gelombang dengan Tinggi 1,8 m
A.3 Pembuatan Direksi Keet
A.4 Pembuatan Los Kerja
A.5 Pengukuran dan Pemasangan 1m bouwplank
A.6 Pembuatan Papan Nama Proyek
B Pekerjaan Tanah
B.1 Pekerjaan Galian Tanah Sedalam 1 m (Untuk Pondasi Batu Kali)
B.2 Pekerjaan Galian Tanah Sedalam 1,5 m (Galian Pondasi Pile Cap dan Setempat)
B.3 Pekerjaan Urugan Tanah Kembali 1/3 Galian
C Pekerjaan Pondasi
C.1 Pekerjaan Pondasi Batu Kali
C.1.1 Pekerjaan Urugan Pasir
C.1.2 Pekerjaan Pasangan Bata (Pondasi Rollag)
C.1.3 Pekerjaan Adukan Beton Pondasi
C.1.4 Pekerjaan Penulangan Beton Pondasi
C.1.5 Pekerjaan Bekisting
C.2 Pekerjaan Pondasi Setempat
c.2.1 Pekerjaan Adukan Beton Pondasi
C.2.2 Pekerjaan Penulangan Beton Pondasi
C.2.3 Pekerjaan Bekisting
C.3 Pekerjaan Pondasi Pile Cap
C.3.1 Pekerjaan Adukan Beton Pondasi
C.3.2 Pekerjaan Penulangan Beton Pondasi
C.3.3 Pekerjaan Bekisting
D Pekerjaan Beton
D.1 Pekerjaan Kolom
D.1.1 Pekerjaan Beton Struktur
D.1.2 Pekerjaan Penulangan Beton
D.1.3 Pekerjaan Bekisting
D.2 Pekerjaan Balok
D.2.1 Pekerjaan Beton Struktur
D.2.2 Pekerjaan Penulangan Beton
D.2.3 Pekerjaan Bekisting
D.3 Pekerjaan Sloof
D.3.1 Pekerjaan Beton Struktur
D.3.2 Pekerjaan Penulangan Beton
D.3.3 Pekerjaan Bekisting
D.4 Pekerjaan Tangga
D.4.1 Pekerjaan Beton Struktur
D.4.2 Pekerjaan Penulangan Beton
D.4.3 Pekerjaan Bekisting
D.5 Pekerjaan Ringbalk
D.5.1 Pekerjaan Beton Struktur
D.5.2 Pekerjaan Penulangan Beton
D.5.3 Pekerjaan Bekisting
D.6 Pekerjaan Plat Lantai
D.6.1 Pekerjaan Beton Struktur
D.6.2 Pekerjaan Penulangan Beton
D.6.3 Pekerjaan Bekisting
D.7 Pekerjaan Dak Beton
D.7.1 Pekerjaan Beton Struktur
D.7.2 Pekerjaan Penulangan Beton
D.7.3 Pekerjaan Bekisting
E Pekerjaan Dinding
E.1 Pekerjaan Pasangan Bata Merah 1/2 Bt (1 pc : 4 Ps)
E.2 Pekerjaan Plesteran tebal 2 cm
E.3 Pekerjaan Acian
E.4 Pekerjaan Dinding Keramik
E.5 Pekerjaan Bata Roster
F Pekerjaan Lantai
F.1 Pekerjaan Lantai 20x20, 30x30, 33x33, 50x50
F.2 Pekerjaan Plint Lantai
G Pekerjaan Kusen, Pintu dan Jendela
G.1 Pekerjaan Pemasangan Kusen Pintu dan Kusen Jendela Kayu
G.2 Pekerjaan Pemasangan Rangka Pintu dan Jendela Kayu
G.3 Pekerjaan Pemasangan Daun Teakwood Rangkap
G.4 Pekerjaan Pemasangan Rangka Pintu Besi Square Tube
G.5 Pekerjaan Pemasangan Pintu Rolling Door Besi
G.6 Pekerjaan Pemasangan Kusen Pintu dan Jendela Alumunium
G.7 Pekerjaan Pemasangan Rangka Pintu dan Jendela Alumunium
G.8 Pekerjaan Pemasangan Rangka Pintu Kaca Alumunium
G.9 Pekerjaan Pemasangan Engsel Pintu
G.10 Pekerjaan Pemasangan Engsel Jendela Kupu-kupu
G.11 Pekerjaan Pemasangan Kunci Selot
G.12 Pekerjaan Pemasangan Door Holder / Pegangan Pintu
G.13 Pekerjaan Pemasangan Rel Pintu Dorong
G.14 Pekerjaan Pemasangan Kaca, tebal 5 mm
G.15 Pekerjaan Pemasangan Glassblock
G.16 Pekerjaan Pemasangan Pemasangan Kait Angin (Ramskar)
H Pekerjaan Atap
H.1 Pekerjaan Pembuatan dan Pemasangan Konstruksi Kuda-kuda Kayu
H.2 Pekerjaan Pembuatan dan Pemasangan Gording
H.3 Pekerjaan Pembuatan dan Pemasangan Rangka Atap Genteng Kanmuri
H.4 Pekerjaan Pembuatan dan Pemasangan Lisplank (3x20 cm)
H.5 Pekerjaan Pembuatan dan Pemasangan Lisplank (3x30 cm)
H.6 Pekerjaan Pemasangan Penutup Atap Genteng Kanmuri
I Pekerjaan Plafond
I.1 Pekerjaan Pembuatan dan Pemasangan Rangka Plafond
I.2 Pekerjaan Pengadaan dan Pemasangan Plafond Gypsumboard T=9mm
I.3 Pekerjaan Pengadaan dan Pemasangan List Plafond Gypsum
J Pekerjaan Pengecatan
J.1 Pekerjaan Pengecatan Tembok Baru
J.2 Pekerjaan Pengecatan Bidang Kayu Baru
K Pekerjaan Sanitasi
K.1 Pekerjaan Pemasangan Kloset Duduk
K.2 Pekerjaan Pemasangan Kloset Jongkok
K.3 Pekerjaan Pemasangan Washtafel
K.4 Pekerjaan Pembuatan Septic Tank
K.5 Pekerjaan Pembuatan Bak Kontrol
K.6 Pekerjaan Pemasangan Pipa
K.6.1 Pekerjaan Pemasangan Pipa PVC tipe AW d = 1/2"
K.6.2 Pekerjaan Pemasangan Pipa PVC tipe AW d = 3/4"
K.6.3 Pekerjaan Pemasangan Pipa PVC tipe AW d = 1"
K.6.4 Pekerjaan Pemasangan Pipa PVC tipe AW d = 2"
K.6.5 Pekerjaan Pemasangan Pipa PVC tipe AW d = 3"
K.6.6 Pekerjaan Pemasangan Pipa PVC tipe AW d = 4"
K.6.7 Pekerjaan Pemasangan Pipa Galvanis d = 1/2"
K.7 Pekerjaan Pemasangan Bak Cuci Piring Stainless Steel
K.8 Pekerjaan Pemasangan Kran Air diameter 3/4" atau 1/2 "
K.9 Pekerjaan Pemasangan Floor Drain
K.10 Pekerjaan Pemasangan Jetwasher
K.11 Pekerjaan Pemasangan Kran Sink
K.12 Pekerjaan Pemasangan Shower
K.13 Pekerjaan Pemasangan Bathtube
L Pekerjaan Elektikal
L.1 Pekerjaan Pemasangan Stop Kontak
L.2 Pekerjaan Pemasangan Saklar
L.3 Pekerjaan Pemasangan Lampu TL (LAMPU WASHTAFEL)
L.4 Pekerjaan Pemasangan Lampu Taman
L.5 Pekerjaan Pemasangan Panel Listrik
L.6 Pekerjaan Pemasangan Lampu Pijar
M Pekerjaan Lain-Lain
M.1 Pekerjaan Pemasangan Railing
M.2 Pekerjaan Dinding Batu Tempel
ANALISA HARGA SAT

NO URAIAN
1 2
A PEKERJAAN PERSIAPAN
A.1 Pembersihan 1 m2 Lapangan

Pekerja
Mandor

NO URAIAN

1 2
A.2 Pembuatan 1m2 Pagar Sementara dari Seng Gelombang Tinggi 1,8m
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Dolken Kayu φ 8 - 10 / 400 cm
Semen Potland
Seng Gelombang BJLS 25, Uk 90 x 180 cm
Pasir Beton
Batu Koral Beton Kali
Kayu Meranti Kaso 5/7
Paku 2" - 5"
Cat Meni Besi
JUMLAH
NO URAIAN
1 2
A.3 Pembuatan 1m2 Direksi Keet
Pekerja
Tukang Batu
Tukang Kayu
Kepala Tukang
Mandor
Dolken Kayu φ 8 - 10 / 400 cm
Kayu Meranti Papan 3/20
Besi Strip
Semen Potland
Pasir Pasang
Pasir Beton
Batu Koral Beton Kali
Bata Merah Kualitas I
Seng Gelombang BJLS 25, Uk 90 x 180 cm
Jendela Nako + Accessories
Kaca Polos tebal 3mm
Kunci Tanam
Plywood (t=4mm)
JUMLAH
NO URAIAN
1 2
A.4 Pembuatan 1m2 Los Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Dolken Kayu φ 8 - 10 / 400 cm
Kayu Meranti Papan 3/20
Paku 2" - 5"
Semen Potland
Pasir Beton
Batu Koral Beton Kali
Seng Gelombang BJLS 25, Uk 90 x 180 cm
Plywood (t=4mm)
JUMLAH
NO URAIAN
1 2
A.5 Pembuatan 1m2 Papan Nama Proyek
Pekerja
Kayu Meranti Papan 3/20
Kayu Meranti Kaso 5/7
Paku 2" - 5"
Cat SEIV Gloss Warna Strandar
JUMLAH
NO URAIAN
1 2
A.6 Pemasangan 1m' Bouwplank
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kayu Meranti Balok 6/12
Paku 2" - 3"
Kayu Meranti Papan 3/20
JUMLAH
ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN

Harga Satuan (Rp)


URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
RSIAPAN
Lapangan

0.1 Oh Rp 95,600.00 -
0.05 Oh Rp 131,000.00 -
JUMLAH
Harga Satuan (Rp)
URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
agar Sementara dari Seng Gelombang Tinggi 1,8m
0.2 Oh Rp 95,600.00 -
0.4 Oh Rp 109,300.00 -
0.02 Oh Rp 120,000.00 -
0.02 Oh Rp 131,000.00 -
- 10 / 400 cm 1.25 Batang - Rp 25,000.00
2.5 Kg - Rp 1,100.00
BJLS 25, Uk 90 x 180 cm 1.2 Lbr - Rp 55,000.00
0.005 m3 - Rp 250,000.00
Kali 0.009 m 3
- Rp 258,750.00
so 5/7 0.072 m3 - Rp 2,400,000.00
0.06 Kg - Rp 30,000.00
0.45 Liter - Rp 20,250.00
JUMLAH
Harga Satuan (Rp)
URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
Direksi Keet
2.000 Oh Rp 95,600.00 -
1.000 Oh Rp 109,300.00 -
2.000 Oh Rp 109,300.00 -
0.300 Oh Rp 120,000.00 -
0.050 Oh Rp 131,000.00 -
- 10 / 400 cm 1.250 Batang - Rp 25,000.00
an 3/20 0.180 m3 - Rp 3,000,000.00
1.100 Kg - Rp 56,500.00
35.000 Kg - Rp 1,100.00
0.150 m3 - Rp 224,500.00
0.100 m3 - Rp 250,000.00
Kali 0.150 m3 - Rp 258,750.00
tas I 30.000 bh - Rp 700.00
BJLS 25, Uk 90 x 180 cm 0.250 Lbr - Rp 55,000.00
ccessories 0.200 Set - Rp 395,000.00
3mm 0.080 m2 - Rp 80,000.00
0.150 bh - Rp 125,000.00
) 0.060 Lbr - Rp 58,300.00
JUMLAH
Harga Satuan (Rp)
URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
os Kerja
1 Oh Rp 95,600.00 -
2 Oh Rp 109,300.00 -
0.2 Oh Rp 120,000.00 -
0.05 Oh Rp 131,000.00 -
- 10 / 400 cm 1.25 Batang - Rp 25,000.00
an 3/20 0.186 m3 - Rp 3,000,000.00
0.3 Kg - Rp 30,000.00
18 Kg - Rp 1,100.00
0.03 m3 - Rp 250,000.00
Kali 0.05 m3 - Rp 258,750.00
BJLS 25, Uk 90 x 180 cm 0.15 Lbr - Rp 55,000.00
) 0.1 Lbr - Rp 58,300.00
JUMLAH
Harga Satuan (Rp)
URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
apan Nama Proyek
0.1 Oh Rp 95,600.00 -
an 3/20 0.18 m3 - Rp 3,000,000.00
so 5/7 0.06 m3 - Rp 2,400,000.00
0.25 Kg - Rp 30,000.00
Warna Strandar 0.1 Liter - Rp 55,000.00
JUMLAH
Harga Satuan (Rp)
URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
Bouwplank
0.1 Oh Rp 95,600.00 -
0.1 Oh Rp 109,300.00 -
0.01 Oh Rp 120,000.00 -
0.005 Oh Rp 131,000.00 -
ok 6/12 0.012 m3 - Rp 2,800,000.00
0.02 Kg - Rp 25,000.00
an 3/20 0.005 m3 - Rp 3,000,000.00
JUMLAH
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)

- Rp 9,560.00 - - Rp 9,560.00
- Rp 6,550.00 - - Rp 6,550.00
Rp 16,110.00
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)

- Rp 19,120.00 - - Rp 19,120.00
- Rp 43,720.00 - - Rp 43,720.00
- Rp 2,400.00 - - Rp 2,400.00
- Rp 2,620.00 - - Rp 2,620.00
- - Rp 31,250.00 - Rp 31,250.00
- - Rp 2,750.00 - Rp 2,750.00
- - Rp 66,000.00 - Rp 66,000.00
- - Rp 1,250.00 - Rp 1,250.00
- - Rp 2,328.75 - Rp 2,328.75
- - Rp 172,800.00 - Rp 172,800.00
- - Rp 1,800.00 - Rp 1,800.00
- - Rp 9,112.50 - Rp 9,112.50
Rp 67,860.00 Rp 287,291.25 - Rp 355,151.25
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)

- Rp 191,200.00 - - Rp 191,200.00
Rp 109,300.00 - - Rp 109,300.00
- Rp 218,600.00 - - Rp 218,600.00
- Rp 36,000.00 - - Rp 36,000.00
- Rp 6,550.00 - - Rp 6,550.00
- - Rp 31,250.000 - Rp 31,250.00
- - Rp 540,000.000 - Rp 540,000.00
- - Rp 62,150.000 - Rp 62,150.00
- - Rp 38,500.000 - Rp 38,500.00
- - Rp 33,675.000 - Rp 33,675.00
- - Rp 25,000.000 - Rp 25,000.00
- - Rp 38,812.500 Rp 38,812.50
- - Rp 21,000.000 - Rp 21,000.00
- - Rp 13,750.000 - Rp 13,750.00
- - Rp 79,000.000 Rp 79,000.00
- - Rp 6,400.000 - Rp 6,400.00
- - Rp 18,750.000 - Rp 18,750.00
- - Rp 3,498.000 - Rp 3,498.00
Rp 561,650.00 Rp 911,785.50 - Rp 1,473,435.50
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)

- Rp 95,600.00 - - Rp 95,600.00
- Rp 218,600.00 - - Rp 218,600.00
- Rp 24,000.00 - - Rp 24,000.00
- Rp 6,550.00 - - Rp 6,550.00
- - Rp 31,250.00 - Rp 31,250.00
- - Rp 558,000.00 - Rp 558,000.00
- - Rp 9,000.00 - Rp 9,000.00
- - Rp 19,800.00 - Rp 19,800.00
- - Rp 7,500.00 - Rp 7,500.00
- - Rp 12,937.50 - Rp 12,937.50
- - Rp 8,250.00 - Rp 8,250.00
- - Rp 5,830.00 - Rp 5,830.00
Rp 344,750.00 Rp 652,567.50 - Rp 997,317.50
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)

- Rp 9,560.00 - - Rp 9,560.00
- - Rp 540,000.00 - Rp 540,000.00
- - Rp 144,000.00 - Rp 144,000.00
- - Rp 7,500.00 - Rp 7,500.00
- - Rp 5,500.00 - Rp 5,500.00
Rp 9,560.00 Rp 697,000.00 - Rp 706,560.00
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)

- Rp 9,560.00 - - Rp 9,560.00
- Rp 10,930.00 - - Rp 10,930.00
- Rp 1,200.00 - - Rp 1,200.00
- Rp 655.00 - - Rp 655.00
- - Rp 33,600.00 - Rp 33,600.00
- - Rp 500.00 - Rp 500.00
- - Rp 15,000.00 - Rp 15,000.00
Rp 22,345.00 Rp 49,100.00 - Rp 71,445.00
PERHITUNGAN VOLUME PEKERJAAN PERSIAPAN

Pembersihan Lahan
Panjang = 30
A.1
Lebar = 14
Luas Tanah = 420
Pembuatan Pagar Proyek
Seng Gelombang BJLS 25, 0.9 x 1.8
Jumlah sisi = 2
A.2 Panjang (Lahan) = 14
Tinggi Seng = 1.80
Luas Seng = 50.4
Banyaknya Seng = 31.1111111111
Pembuatan 1m2 Direksi Keet
Panjang Direksi Keet = 3.5
A.3
Lebar Direksi Keet = 3.5
Luas Direksi Keet = 12.25
Pembuatan 1m2 Los Kerja
Panjang Los Kerja = 4
A.4
Lebar Los Kerja = 3
Luas Los Kerja = 12
Pembuatan 1m2 Papan Nama Proyek
Panjang Papan Proyek = 1.2
A.5
Lebar Papan Proyek = 0.6
Luas Papan Proyek = 0.72
Pembuatan 1m' Pemasangan Bouwplank
HORIZONTAL VERTIKAL
Titik AS Panjang (m') Titik AS
G1-F1 2.2 11A-10A
F1-D1 3.4 10A-9A
D1-C2 3.24 9A-8A
C2-A2 5.4 8A-7A
D3-C3 3 7A-6A
G4-F4 2.2 6A-5A
G3-F3 2.2 5A-4A
D4-C4 3 4A-3A
D5-C5 3 3A-2A
C5-A5 5.4 10B-9B
A6-B6 3 9B-7B
A7-B7 3 7B-6B
B7-C7 2.5 6B-5B
A.6
C7-E7 4.6 4C-3C
G7-E7 4 3C-2C
A8-X 2 5D-4D
A9-B9 3.15 4D-3D
E9-G9 4 3D-1D
E10-G10 4 10E-9E
A10-B10 3.15 9E-7E
A11-G11 14 4F-1F
Bouwplank P7 3 11G-10G
JUMLAH SISI 83.44 10G-9G
9G-7G
7G-5G
VOLUME BOUWBLANK (m') 5G-4G
4G-1G
Bouwplank P7
173.74 JUMLAH SISI
SIAPAN

No
m 1
m A
m2 A.1

x 1.8

m
m
No
m2
bh 1
et A.2
m
m
m2

m
m
m2
royek
m
m
m2
wplank
VERTIKAL
Panjang (m')
5
No
2
1.2 1
6.8 A.3
3
1
1.8
2.2
1.5
2
8
3
1
2.2
1.5
1.8
2.2
2
2
8
4.2
5
2
8
4
No
1.8
4.2 1
2.9 A.4
90.3

No

1
A.5
No
1
A.6
REKAPITULASI KEBUTUHAN BAHA

Uraian Pekerjaan Koef/Vol Satuan


2 3 4
PEKE
Pembersihan Lapangan 420.00 m 2

Pekerja 0.10 Oh
Mandor 0.05 Oh

Uraian Pekerjaan Koef/Vol Satuan

2 3 4
Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 1,8m 28.00 m'
Pekerja 0.20 Oh
Tukang Kayu 0.40 Oh
Kepala Tukang Kayu 0.02 Oh
Mandor 0.02 Oh
Dolken Kayu φ 8 - 10 / 400 cm 1.250 Batang
Semen Potland 2.500 Kg
Seng Gelombang BJLS 25, Uk 90 x 180 cm 1.200 Lbr
Pasir Beton 0.005 m3
Batu Koral Beton Kali 0.009 m3
Kayu Meranti Kaso 5/7 0.072 m3
Paku 2" - 5" 0.060 Kg
Cat Meni Besi 0.450 Liter

Uraian Pekerjaan Koef/Vol Satuan


2 3 4
Pembuatan 1m2 Direksi Keet 12.25 m2
Pekerja 2.000 Oh
Tukang Batu 1.000 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang 0.300 Oh
Mandor 0.050 Oh
Dolken Kayu φ 8 - 10 / 400 cm 1.250 Batang
Kayu Meranti Papan 3/20 0.180 m3
Besi Strip 1.100 Kg
Semen Potland 35.000 Kg
Pasir Pasang 0.150 m3
Pasir Beton 0.100 m3
Batu Koral Beton Kali 0.150 m3
Bata Merah Kualitas I 30.000 bh
Seng Gelombang BJLS 25, Uk 90 x 180 cm 0.250 Lbr
Jendela Nako + Accessories 0.200 Set
Kaca Polos tebal 3mm 0.080 m2
Kunci Tanam 0.150 bh
Plywood (t=4mm) 0.060 Lbr

Uraian Pekerjaan Koef/Vol Satuan


2 3 4
Pembuatan 1m2 Los Kerja 12 m2
Pekerja 1.000 Oh
Tukang Kayu 2.000 Oh
Kepala Tukang Kayu 0.200 Oh
Mandor 0.050 Oh
Dolken Kayu φ 8 - 10 / 400 cm 1.250 Batang
Kayu Meranti Papan 3/20 0.186 m3
Paku 2" - 5" 0.300 Kg
Semen Potland 18.000 Kg
Pasir Beton 0.030 m3
Batu Koral Beton Kali 0.050 m3
Seng Gelombang BJLS 25, Uk 90 x 180 cm 0.150 Lbr
Polywood (t=4mm) 0.100 Lbr

Uraian Pekerjaan Koef/Vol Satuan

2 3 4
Pembuatan 1m2 Papan Nama Proyek 0.720 m2
Pekerja 0.10 Oh
Kayu Meranti Papan 3/20 0.18 m3
Kayu Meranti Kaso 5/7 0.06 m3
Paku 2" - 5" 0.25 Kg
Cat SEIV Gloss Warna Strandar 0.10 Liter

Uraian Pekerjaan Koef/Vol Satuan


2 3 4
Pemasangan 1m' Bouwplank 173.740 m'
Pekerja 0.1000 Oh
Tukang Kayu 0.1000 Oh
Kepala Tukang Kayu 0.0100 Oh
Mandor 0.0050 Oh
Kayu Meranti Balok 6/12 0.0120 m3
Paku 2" - 3" 0.0200 Kg
Kayu Meranti Papan 3/20 0.0050 m3
KEBUTUHAN BAHAN DAN TENAGA KERJA PER PEKERJAAN

Harga Satuan (Rp) Jumlah yang Dibutuhkan


Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10
PEKERJAAN PERSIAPAN

Rp 95,600.00 - - 42 - -
Rp 131,000.00 - - 21 - -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10

Rp 95,600.00 - - 5.6 - -
Rp 109,300.00 - - 11.2 - -
Rp 120,000.00 - - 0.56 - -
Rp 131,000.00 - - 0.56 - -
- Rp 25,000.00 - - 35 -
- Rp 1,100.00 - - 70 -
- Rp 55,000.00 - - 33.6 -
- Rp 250,000.00 - - 0.14 -
- Rp 258,750.00 - - 0.252 -
- Rp 2,400,000.00 - - 2.016 -
- Rp 30,000.00 - - 1.68 -
- Rp 20,250.00 - - 12.6 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10

Rp 95,600.00 - - 24.5 - -
Rp 109,300.00 - - 12.25 - -
Rp 109,300.00 - - 24.5 - -
Rp 120,000.00 - - 3.675 - -
Rp 131,000.00 - - 0.6125 - -
- Rp 25,000.00 - - 15.3125 -
- Rp 3,000,000.00 - - 2.205 -
- Rp 56,500.00 - - 13.475 -
- Rp 1,100.00 - - 428.75 -
- Rp 224,500.00 - - 1.8375 -
- Rp 250,000.00 - - 1.225 -
- Rp 258,750.00 - - 1.8375 -
- Rp 700.00 - - 367.5 -
- Rp 55,000.00 - - 3.0625 -
- Rp 395,000.00 - - 2.45 -
- Rp 80,000.00 - - 0.98 -
- Rp 125,000.00 - - 1.8375 -
- Rp 58,300.00 - - 0.735 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10

Rp 95,600.00 - - 12 - -
Rp 109,300.00 - - 24 - -
Rp 120,000.00 - - 2.4 - -
Rp 131,000.00 - - 0.6 - -
- Rp 25,000.00 - - 15 -
- Rp 3,000,000.00 - - 2.232 -
- Rp 30,000.00 - - 3.6 -
- Rp 1,100.00 - - 216 -
- Rp 250,000.00 - - 0.36 -
- Rp 258,750.00 - - 0.6 -
- Rp 55,000.00 - - 1.8 -
- Rp 58,300.00 - - 1.2 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10

Rp 95,600.00 - - 0.072 - -
- Rp 3,000,000.00 - - 0.1296 -
- Rp 2,400,000.00 - - 0.0432 -
- Rp 30,000.00 - - 0.18 -
- Rp 55,000.00 - - 0.072 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10

Rp 95,600.00 - - 17.374 - -
Rp 109,300.00 - - 17.374 - -
Rp 120,000.00 - - 1.7374 - -
Rp 131,000.00 - - 0.8687 - -
- Rp 2,800,000.00 - - 2.08488 -
- Rp 25,000.00 - - 3.4748 -
- Rp 3,000,000.00 - - 0.8687 -
Jumlah
Total
N

Harga Material (Rp)


Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)

Rp 4,015,200.00 - -
Rp 2,751,000.00 - -
Rp 6,766,200.00
Rp 6,766,200.00
Harga Material (Rp)
Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)

Rp 535,360.00 - -
Rp 1,224,160.00 - -
Rp 67,200.00 - -
Rp 73,360.00 - -
- Rp 875,000.00 -
- Rp 77,000.00 -
- Rp 1,848,000.00 -
- Rp 35,000.00 -
- Rp 65,205.00 -
- Rp 4,838,400.00 -
- Rp 50,400.00 -
- Rp 255,150.00 -
Rp 1,900,080.00 Rp 8,044,155.00 -
Rp 9,944,235.00
Harga Material (Rp)
Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)

Rp 2,342,200.00 - -
Rp 1,338,925.00 - -
Rp 2,677,850.00 - -
Rp 441,000.00 - -
Rp 80,237.50 - -
- Rp 382,812.50 -
- Rp 6,615,000.00 -
- Rp 761,337.50 -
- Rp 471,625.00 -
- Rp 412,518.75 -
- Rp 306,250.00 -
- Rp 475,453.13 -
- Rp 257,250.00 -
- Rp 168,437.50 -
- Rp 967,750.00 -
- Rp 78,400.00 -
- Rp 229,687.50 -
- Rp 42,850.50 -
Rp 6,880,212.50 Rp 11,169,372.38
Rp 18,049,584.88
Harga Material (Rp)
Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)

Rp 1,147,200.00 - -
Rp 2,623,200.00 - -
Rp 288,000.00 - -
Rp 78,600.00 - -
- Rp 375,000.00 -
- Rp 6,696,000.00 -
- Rp 108,000.00 -
- Rp 237,600.00 -
- Rp 90,000.00 -
- Rp 155,250.00 -
- Rp 99,000.00 -
- Rp 69,960.00 -
Rp 4,137,000.00 Rp 7,830,810.00 -
Rp 11,967,810.00
Harga Material (Rp)
Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)

Rp 6,883.20 - -
- Rp 388,800.00 -
- Rp 103,680.00 -
- Rp 5,400.00 -
- Rp 3,960.00 -
Rp 6,883.20 Rp 501,840.00 -
Rp 508,723.20
Harga Material (Rp)
Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)

Rp 1,660,954.40 - -
Rp 1,898,978.20 - -
Rp 208,488.00 - -
Rp 113,799.70 - -
- Rp 5,837,664.00 -
- Rp 86,870.00 -
- Rp 2,606,100.00 -
Rp 3,882,220.30 Rp 8,530,634.00 -
Rp 12,412,854.30
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJA

HARGA SATUAN
NO URUTAN PEKERJAAN VOL SAT
UPAH
1 2 3 4 5
A.1 Pembersihan Lapangan 420.000 m2 Rp 16,110.00
A.2 Pembuatan Pagar Sementara 28.000 m' Rp 67,860.00
A.3 Pembuatan Direksi Keet 12.250 m2 Rp 561,650.00
A.4 Pembuatan Los Kerja 12.000 m2 Rp 344,750.00
A.5 Pembuatan Papan Nama Proyek 0.720 m2
Rp 9,560.00
A.6 Pemasangan Bouwplank 173.740 m' Rp 22,345.00
Total Anggaran Biaya

No Jenis Bahan Satuan Jumlah Kebutuhan


1 2 3 4
1 Dolken Kayu φ 8 - 10 / 400 cm Batang 65.31
2 Kayu Meranti Kaso 5/7 m3 2.06
3 Kayu Meranti Papan 3/20 m3 5.44
4 Kayu Meranti Balok 6/12 m3 2.08
5 Polywood, t=4mm Lbr 1.94
6 Pasir pasang m2 1.84
7 Pasir Beton m3 1.73
8 Semen Portland Kg 714.75
9 Batu Koral Beton Kali m3 2.69
10 Cat Meni Besi Liter 12.60
11 Cat SEIV Gloss Warna Standar Liter 0.07
12 Paku 2" - 3" Kg 3.47
13 Kunci Tanam Bh 1.84
14 Jendela nako + accessories Set 2.45
15 Paku 2" - 5" Kg 5.46
16 Batu bata merah bakar kualitas I bh 367.50
17 Besi Strip bh 13.48
18 Kaca Polos tebal 3 mm m2 0.98
19 Seng Gelombang BJLS 25, Uk 90 x 180 cm Lbr 38.4625
REKAPITULASI UPAH PEKERJAAN P

No Tenaga Kerja Satuan Jumlah Kebutuhan


1 2 3 4
1 Pekerja Oh 101.546
2 Tukang Batu Oh 12.25
2 Tukang Kayu Oh 77.074
3 Kepala Tukang Oh 8.3724
4 Mandor Oh 23.6412
ARAN BIAYA PEKERJAAN PERSIAPAN

HARGA SATUAN JUMLAH HARGA TOTAL HARGA


BAHAN UPAH BAHAN (UPAH+BAHAN)
6 7 = (3x5) 8 = (3x6) 9 = (7+8)
- Rp 6,766,200.00 - Rp 6,766,200.00
Rp 287,291.25 Rp 1,900,080.00 Rp 8,044,155.00 Rp 9,944,235.00
Rp 911,785.50 Rp 6,880,212.50 Rp 11,169,372.38 Rp 18,049,584.88
Rp 652,567.50 Rp 4,137,000.00 Rp 7,830,810.00 Rp 11,967,810.00
Rp 697,000.00 Rp 6,883.20 Rp 501,840.00 Rp 508,723.20
Rp 49,100.00 Rp 3,882,220.30 Rp 8,530,634.00 Rp 12,412,854.30
Rp 23,572,596.00 Rp 36,076,811.38 Rp 59,649,407.38

Harga Satuan (Rp) Biaya Bahan


5 6 = (4 x 5)
Rp 25,000.00 Rp 1,632,812.50
Rp 2,400,000.00 Rp 4,942,080.00
Rp 3,000,000.00 Rp 16,305,900.00
Rp 2,800,000.00 Rp 5,837,664.00
Rp 58,300.00 Rp 112,810.50
Rp 224,500.00 Rp 412,518.75
Rp 250,000.00 Rp 431,250.00
Rp 1,100.00 Rp 786,225.00
Rp 258,750.00 Rp 695,908.13
Rp 20,250.00 Rp 255,150.00
Rp 55,000.00 Rp 3,960.00
Rp 25,000.00 Rp 86,870.00
Rp 125,000.00 Rp 229,687.50
Rp 395,000.00 Rp 967,750.00
Rp 30,000.00 Rp 163,800.00
Rp 700.00 Rp 257,250.00
Rp 56,500.00 Rp 761,337.50
Rp 80,000.00 Rp 78,400.00
Rp 55,000.00 Rp 2,115,437.50
TOTAL Rp 36,076,811.38
I UPAH PEKERJAAN PERSIAPAN

Harga Satuan (Rp) Biaya Upah


5 6 = (4 x 5)
Rp 95,600.00 Rp 9,707,797.60
Rp 109,300.00 Rp 1,338,925.00
Rp 109,300.00 Rp 8,424,188.20
Rp 120,000.00 Rp 1,004,688.00
Rp 131,000.00 Rp 3,096,997.20
TOTAL Rp 23,572,596.00
AN

NO URAIAN
1 2
B PEKERJAAN TANAH
B.1 Penggalian 1 m3 Tanah Biasa Sedalam 1 m

Pekerja
Mandor

B.2 Pengurungan Kembali 1 m3 Galian Tanah

Pekerja
Mandor

REN

NO URUTUAN PEKERJAAN

1 2
B PEKERJAAN TANAH
B.1 Penggalian Tanah Biasa Sedalam 1 m
B.2 Pengurugan dengan Tanah Urug

REKAPITULA

No Tenaga Kerja Satuan


1 2 3
1 Pekerja Oh
4 Mandor Oh
ANALISA HARGA SATUAN PEKERJAAN TANAH

Harga Satuan (Rp)


KOEF SAT
Upah Bahan Alat
3 4 5 6 7

0.750 Oh Rp 95,600.00 - -
0.025 Oh Rp 131,000.00 - -
JUMLAH

0.50 Oh Rp 95,600.00 - -
0.05 Oh Rp 131,000.00 - -
JUMLAH

RENCANA ANGGARAN BIAYA PEKERJAAN TANAH

Harga Satuan (Rp)


AN VOL SAT
Upah Bahan Alat
3 4 5 6 7

149.66 m3 Rp 74,975.00 - -
47.53 m3 Rp 54,350.00 - -
TOTAL

REKAPITULASI KEBUTUHAN PEKERJA UNTUK PEKERJAAN TANAH

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah


3 4 5 6 = (4 x 5)
Oh 136.0069727083 Rp 95,600.00 Rp 13,002,266.59
Oh 6.1179273958 Rp 131,000.00 Rp 801,448.49
TOTAL Rp 13,803,715.08
Jumlah Harga (Rp)
Jumlah (Rp)
Upah Bahan Alat
8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)

Rp 71,700.00 - - Rp 71,700.00
Rp 3,275.00 - - Rp 3,275.00
Rp 74,975.00

Rp 47,800.00 - - Rp 47,800.00
Rp 6,550.00 - - Rp 6,550.00
Rp 54,350.00

Jumlah Harga (Rp)


Jumlah (Rp)
Upah Bahan Alat
8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)

Rp 11,220,413.43 - - Rp 11,220,413.43
Rp 2,583,301.65 - - Rp 2,583,301.65
Rp 13,803,715.08 - - Rp 13,803,715.08

N TANAH
REKAPITULASI KEBUTUHAN BAHAN DAN TENA

No Uraian Pekerjaan Koef/Vol Satuan


1 2 3 4
B PEKERJAAN
B.1 Penggalian 1 m3 Tanah Biasa Sedalam 1 m 149.66 m3
Pekerja 0.750 Oh
Mandor 0.025 Oh

No Uraian Pekerjaan Koef/Vol Satuan

1 2 3 4
B.2 Pengurungan Kembali 1 m3 Galian Tanah 47.53 m3
Pekerja 0.500 Oh
Mandor 0.050 Oh

REKAPITULASI VOLUME PEKERJAAN GALIAN TANAH


No Jenis Galian Volume Satuan
1 Galian Tanah Pondasi (Batu Kali + Rollag) 142.59 m3
2 Galian Tanah Pile Cap 3.10 m3
3 Galian Tanah Tie Beam 3.96 m3
TOTAL 149.66 m3

REKAPITULASI VOLUME PEKERJAAN URUGAN TANAH


No Jenis Galian Volume Satuan
1 Galian Urugan Pondasi (Batu Kali + Rollag) 142.59 m3
2 Galian Urugan Pile Cap - m3
3 Galian Urugan Tie Beam - m3
TOTAL (1/3 Dari Galian Tanah) 47.53 m3
UTUHAN BAHAN DAN TENAGA KERJA PER PEKERJAAN

Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)


Upah Bahan Alat Upah Bahan Alat Upah Bahan
5 6 7 8 9 10 11 = (5 X 8) 12 = (6 X 9)
PEKERJAAN TANAH

Rp 95,600.00 - - 112.2415 - - Rp 10,730,292.00 -


Rp 131,000.00 - - 3.741385 - - Rp 490,121.43 -
Jumlah Rp 11,220,413.43 Rp -
Total Rp 11,220,413.43
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat Upah Bahan
5 6 7 8 9 10 11 = (5 X 8) 12 = (6 X 9)

Rp 95,600.00 - - 23.76542 - - Rp 2,271,974.59 -


Rp 131,000.00 - - 2.376542 - - Rp 311,327.06 -
Jumlah Rp 2,583,301.65 Rp -
Total Rp 2,583,301.65
PERHITUNGAN

aterial (Rp) Pondasi P1 (Batu Kali)


Alat Panjang = 20 m
13 = (7 X 10) Lebar Atas = 2.3 m
Lebar Bawah = 1.8 m
Tinggi = 0.95 m
- Luas Galian = 1.9475 m2
- Volume Galian = 38.95 m3
Rp -
11,220,413.43 Pondasi P2 (Batu Kali)
aterial (Rp) Panjang = 27.15 m
Alat Lebar Atas = 1.514 m
13 = (7 X 10) Lebar Bawah = 1 m
Tinggi = 0.95 m
- Luas Galian = 1.19415 m2
- Volume Galian = 32.42 m3
Rp -
2,583,301.65 Pondasi P3 (Batu Kali)
Panjang = 26.5 m
Lebar Atas = 2.3 m
Lebar Bawah = 1.8 m
Tinggi = 0.95 m
Luas Galian = 1.9475 m2
Volume Galian = 51.61 m3

Pondasi P4 (Batu Kali)


Panjang = 10.35 m
Lebar Atas = 1 m
Lebar Bawah = 1.5 m
Tinggi = 0.95 m
Luas Galian = 1.1875 m2
Volume Galian = 12.29 m3

Pondasi P5 (Pondasi Teras)


Panjang = 13.35 m
Lebar = 0.3 m
Tinggi = 0.4 m
Luas Galian = 0.12 m2
Volume Galian = 1.6 m3

Pondasi P6
Panjang = 6.5 m
Lebar = 0.8 m
Tinggi = 1.1 m
Luas Galian = 0.88 m2
Volume Galian = 5.72 m3
PERHITUNGAN VOLUME PEKERJAAN TANAH

Pile Cap 1 Tie Beam 1


Panjang = 0.50 m Panjang
Lebar = 0.50 m Lebar
Tinggi = 0.40 m Tinggi
Jumlah Pile Cap = 11 Buah Luas Galian
Luas Galian = 0.25 m2 Volume Galian
Volume Galian = 0.10 m3

Volume Galian Total = 1.10 m3 Tie Beam 2A


Panjang
Pile Cap 2 Lebar
Panjang = 0.80 m Tinggi
Lebar = 0.50 m Luas Galian
Tinggi = 0.50 m Volume Galian
Jumlah Pile Cap = 8 Buah
Luas Galian = 0.40 m2 Tie Beam 3A
Volume Galian = 0.20 m3
Panjang
Volume Galian Total = 1.60 m3 Lebar
Tinggi
Pile Cap 2A Luas Galian
Panjang = 0.80 m Volume Galian
Lebar = 0.50 m
Tinggi = 0.50 m Tie Beam 4
Jumlah Pile Cap = 2 Buah Panjang
Luas Galian = 0.40 m2 Lebar
Volume Galian = 0.20 m3 Tinggi
Volume Galian Total = 0.40 m3
Luas Galian
Volume Galian

Tie Beam 5A
Panjang
Lebar
Tinggi
Luas Galian
Volume Galian
Tie Beam 1
= 5.4 m
= 0.15 m
= 0.2 m
= 0.03 m2
= 0.16 m3

Tie Beam 2A Tie Beam 2B


= 18 m Panjang = 22.8 m
= 0.15 m Lebar = 0.150 m
= 0.25 m Tinggi = 0.250 m
= 0.04 m2 Luas Galian = 0.038 m2
= 0.68 m3 Volume Galian = 0.855 m3

Tie Beam 3A
= 13.83 m
= 0.150 m
= 0.300 m
= 0.045 m2
= 0.622 m3

Tie Beam 4
= 8.6 m
= 0.150 m
= 0.350 m
= 0.053 m2
= 0.452 m3

Tie Beam 5A
= 17.100 m
= 0.200 m
= 0.350 m
= 0.070 m2
= 1.197 m3
PERHITUNGAN PANJANG P

Pondasi P1 (Batu Kali) Tie Beam 1


7A-10A = 10 m 4C-5C
7G-10G = 10 m 4D-5D
Total = 20 m 4D'-5D'
Pondasi P2 (Batu Kali) Total
7B-10B = 10 m
7E-10E = 10 m Tie Beam 2A
10E-10G = 4 m C1'-D1'
10A-10B = 3.15 m F1-G1
Total = 27.15 m A1-B1
Pondasi P3 (Batu Kali) 5A-6A
11A-11G = 14 m A'-B'
2A-1'A = 2.5 m B1-C1
10A-11A = 5 m Total
10G-11G = 5 m
Total = 26.5 m Tie Beam 2B
Pondasi P4 (Batu Kali) D1-F1
9E-9G = 4 m C3-D3
9A-9B = 3.15 m C4-D4
9A'-9B' = 1.2 m A1-C1
8A-A' = 2 m 3A-7A
Total = 10.35 m Total
Pondasi P5 (Pondasi Teras)
B7'-E7' = 6.85 m
1'C-1"C = 3.5 m Tie Beam 3A
1'D-1"D = 3 m A1-C1
Total = 13.35 m 2A-3A
Pondasi P6 5G-7G
1"D - 1"C = 3 m D5-D'5
1"D-1"D = 3.5 m Total
Total = 6.5 m
TUNGAN PANJANG PEKERJAAN TANAH

Tie Beam 1 Tie Beam 4


= 1.8 m C7-G7 = 8.6 m
= 1.8 m Total = 8.6 m
= 1.8 m
= 5.4 m Tie Beam 5A
2F-4F = 3.7 m
Tie Beam 2A 2G-4G = 3.7 m
= 3.1 m 2D-5D = 5.5 m
= 2.2 m 1D-4D = 4.2 m
= 6.3 m Total = 17.1 m
= 1 m
= 3.15 m
= 2.25 m
= 18 m

Tie Beam 2B
= 3.4 m
= 3 m
= 3 m
= 5.4 m
= 8 m
= 22.8 m

Tie Beam 3A
= 5.4 m
= 1.5 m
= 4 m
= 2.93 m
= 13.83 m
Harga Satuan (Rp)
NO URAIAN KOEF SAT
Upah

1 2 3 4 5

C PEKERJA
C.1 Pondasi Batu Kali
C.1.1 1 m3 Pondasi Batu Belah 1 SP : 4 PP
Pekerja 1.5 Oh Rp 95,600.00
Tukang Batu 0.75 Oh Rp 109,300.00
Kepala Tukang Batu 0.075 Oh Rp 120,000.00
Mandor 0.075 Oh Rp 131,000.00
Batu Belah 1.2 m3 -
Semen Portland 163 Kg -
Pasir Pasang 0.52 m3 -
JUMLAH
C.1.2 1 m3 Beton Mutu K225
Pekerja 1.65 Oh Rp 95,600.00
Tukang Batu 0.275 Oh Rp 109,300.00
Kepala Tukang Batu 0.028 Oh Rp 120,000.00
Mandor 0.08 Oh Rp 131,000.00
Semen Portland 384.00 Kg -
Koral Beton 0.4943 m3 -
Pasir Beton 0.7696 m 3
-
JUMLAH
C.1.3 Pembesian 1 Kg dengan Besi Polos
Pekerja 0.007 Oh Rp 95,600.00
Tukang Besi 0.007 Oh Rp 109,300.00
Kepala Tukang Besi 0.0007 Oh Rp 120,000.00
Mandor 0.0004 Oh Rp 131,000.00
Besi Beton Polos 1.05 Kg -
Kawat Beton 0.015 Kg -
JUMLAH

C.1.4 Pemasangan 1m2 Bekisting


Pekerja 0.520 Oh Rp 95,600.00
Tukang Kayu 0.260 Oh Rp 109,300.00
Kepala Tukang Kayu 0.026 Oh Rp 120,000.00
Mandor 0.026 Oh Rp 131,000.00
Kayu Meranti Papan 0.040 m3 -
Paku 8-12 cm 0.300 Kg -
Minyak Bekisting 0.100 Liter -
JUMLAH
ANALISA HARGA SATUAN

Harga Satuan (Rp) Jumlah Harga (Rp)


Bahan Alat Upah Bahan Alat

6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)

PEKERJAAN PONDASI

- - Rp 143,400.00 - -
- - Rp 81,975.00 - -
- - Rp 9,000.00 - -
- - Rp 9,825.00 - -
Rp 258,750.00 - - Rp 310,500.00 -
Rp 1,100.00 - - Rp 179,300.00 -
Rp 224,500.00 - - Rp 116,740.00 -
Rp 244,200.00 Rp 606,540.00 -

- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 422,400.00 -
Rp 148,100.00 - - Rp 73,205.83 -
Rp 250,000.00 - - Rp 192,400.00 -
Rp 202,030.50 Rp 688,005.83 -

- - Rp 669.20 - -
- - Rp 765.10 - -
- - Rp 84.00 - -
- - Rp 52.40 - -
Rp 9,500.00 - - Rp 9,975.00 -
Rp 25,000.00 - - Rp 375.00 -
Rp 1,570.70 Rp 10,350.00 -
- - Rp 49,712.000 - -
- - Rp 28,418.000 - -
- - Rp 3,120.000 - -
- - Rp 3,406.000 - -
Rp 3,000,000.00 - - Rp 120,000.000 -
Rp 15,000.00 - - Rp 4,500.000 -
Rp 16,500.00 - - Rp 1,650.000 -
Rp 84,656.000 Rp 126,150.000 -
ANALISA HARGA SATUAN PEKERJAAN PONDASI

Jumlah (Rp) NO URAIAN KOEF SAT

11 = ( 8+9+10) 1 2 3 4

C.2 Pondasi Rollag Bata


C.2.1 Pemasangan 1m2 Bata Merah 1 SP : 4 PP
Pekerja 0.60 Oh
Rp 143,400.00 Tukang Batu 0.20 Oh
Rp 81,975.00 Kepala Tukang Batu 0.02 Oh
Rp 9,000.00 Mandor 0.03 Oh
Rp 9,825.00 Batu Bata Merah 140 Buah
Rp 310,500.00 Semen Portland 26.55 Kg
Rp 179,300.00 Pasir Pasang 0.09 m3
Rp 116,740.00 JUMLAH
Rp 850,740.00 C.2.2 Pemasangan 1m2 Plesteran 1SP : 4PP
Pekerja 0.4 Oh
Rp 157,740.00 Tukang Batu 0.2 Oh
Rp 30,057.50 Kepala Tukang Batu 0.02 Oh
Rp 3,360.00 Mandor 0.022 Oh
Rp 10,873.00 Semen Portland 8.32 Kg
Rp 422,400.00 Pasir Pasang 0.032 m3
Rp 73,205.83 JUMLAH
Rp 192,400.00
Rp 890,036.33
NO URAIAN KOEF SAT

Rp 669.20 1 2 3 4
Rp 765.10 C.3 Pondasi Strauss Pile (Kedalaman 6m)
Rp 84.00 C.3.1 Pemasangan Pile Cap
Rp 52.40 C.3.1.1 1 m3 Pekejraan Lantai Kerja 1 PC : 3 PS : 5 KRL
Rp 9,975.00 Pekerja 2 Oh
Rp 375.00 Tukang Batu 0.5 Oh
Rp 11,920.70 Kepala Tukang Batu 0.05 Oh
Mandor 0.01 Oh
Rp 49,712.000 PC (50 kg) 3.956 zak
Rp 28,418.000 Pasir Beton 0.55 m3
Rp 3,120.000 Split Pecah Mesin 2/3 0.93 m3
Rp 3,406.000 JUMLAH
Rp 120,000.000 C.3.1.2 Membuat 1 m3 Beton Mutu K225
Rp 4,500.000 Pekerja 1.65 Oh
Rp 1,650.000 Tukang Batu 0.275 Oh
Rp 210,806.000 Kepala Tukang Batu 0.028 Oh
Mandor 0.08 Oh
Semen Portland 384.00 Kg
Koral Beton 0.4943 m3
Pasir Beton 0.7696 m3
JUMLAH
C.3.1.3 Pembesian 1 Kg dengan Besi Ulir
Pekerja 0.007 Oh
Tukang Besi 0.007 Oh
Kepala Tukang Besi 0.0007 Oh
Mandor 0.0004 Oh
Besi Beton Ulir 1.05 Kg
Kawat Beton 0.015 Kg
JUMLAH
C.3.1.4 Pemasangan 1m2 Bekisting Untuk Pile Cap
Pekerja 0.520 Oh
Tukang Kayu 0.260 Oh
Kepala Tukang Kayu 0.026 Oh
Mandor 0.026 Oh
Kayu Meranti Papan 0.040 m3
Paku 8-12 cm 0.300 Kg

0.100 Liter
Minyak Bekisting
JUMLAH
C.3.2 Pemasangan Strauss Pile (Kedalaman 6m)
C.3.2.1 Membuat 1 m3 Beton Mutu K225
Pekerja 1.65 Oh
Tukang Batu 0.275 Oh
Kepala Tukang Batu 0.028 Oh
Mandor 0.08 Oh
Semen Portland 384.00 Kg
Koral Beton 0.4943 m3
Pasir Beton 0.7696 m3
JUMLAH
C.3.2.2 Pembesian 1 Kg dengan Besi Polos
Pekerja 0.007 Oh
Tukang Besi 0.007 Oh
Kepala Tukang Besi 0.0007 Oh
Mandor 0.0004 Oh
Besi Beton Polos 1.05 Kg
Kawat Beton 0.015 Kg
JUMLAH
Harga Satuan (Rp) Jumlah Harga (Rp)
Upah Bahan Alat Upah Bahan Alat

5 6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)

PP
Rp 95,600.00 - - Rp 57,360.00 - -
Rp 109,300.00 - - Rp 21,860.00 - -
Rp 120,000.00 - - Rp 2,400.00 - -
Rp 131,000.00 - - Rp 3,930.00 - -
- Rp 700.00 - Rp 98,000.00
- Rp 1,100.00 - - Rp 29,205.00 -
- Rp 224,500.00 - - Rp 20,205.00 -
JUMLAH Rp 85,550.00 Rp 147,410.00 -

Rp 95,600.00 - - Rp 38,240.00 - -
Rp 109,300.00 - - Rp 21,860.00 - -
Rp 120,000.00 - - Rp 2,400.00 - -
Rp 131,000.00 - - Rp 2,882.00 - -
- Rp 1,100.00 - - Rp 9,152.00 -
- Rp 224,500.00 - - Rp 7,184.00 -
JUMLAH Rp 65,382.00 Rp 16,336.00 -

Harga Satuan (Rp) Jumlah Harga (Rp)


Upah Bahan Alat Upah Bahan Alat
5 6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)

PS : 5 KRL
Rp 95,600.00 - - Rp 191,200.00 - -
Rp 109,300.00 - - Rp 54,650.00 - -
Rp 120,000.00 - - Rp 6,000.00 - -
Rp 131,000.00 - - Rp 1,310.00 - -
- Rp 53,000.00 - - Rp 209,668.00 -
- Rp 250,000.00 - - Rp 137,500.00 -
- Rp 195,120.00 - - Rp 181,461.60 -
JUMLAH Rp 253,160.00 Rp 528,629.60 -

Rp 95,600.00 - - Rp 157,740.00 - -
Rp 109,300.00 - - Rp 30,057.50 - -
Rp 120,000.00 - - Rp 3,360.00 - -
Rp 131,000.00 - - Rp 10,873.00 - -
- Rp 1,100.00 - - Rp 422,400.00 -
- Rp 148,100.00 - - Rp 73,205.83 -
- Rp 250,000.00 - - Rp 192,400.00 -
JUMLAH Rp 202,030.50 Rp 688,005.83 -

Rp 95,600.00 - - Rp 669.20 - -
Rp 109,300.00 - - Rp 765.10 - -
Rp 120,000.00 - - Rp 84.00 - -
Rp 131,000.00 - - Rp 52.40 - -
- Rp 11,425.00 - - Rp 11,996.25 -
- Rp 25,000.00 - - Rp 375.00 -
JUMLAH Rp 1,570.70 Rp 12,371.25 -
e Cap
Rp 95,600.00 - - Rp 49,712.000 - -
Rp 109,300.00 - - Rp 28,418.000 - -
Rp 120,000.00 - - Rp 3,120.000 - -
Rp 131,000.00 - - Rp 3,406.000 - -
- Rp 3,000,000.00 - - Rp 120,000.000 -
- Rp 15,000.00 - - Rp 4,500.000 -

- Rp 16,500.00 - - Rp 1,650.000 -
JUMLAH Rp 84,656.000 Rp 126,150.000 -
6m)

Rp 95,600.00 - - Rp 157,740.00 - -
Rp 109,300.00 - - Rp 30,057.50 - -
Rp 120,000.00 - - Rp 3,360.00 - -
Rp 131,000.00 - - Rp 10,873.00 - -
- Rp 1,100.00 - - Rp 422,400.00 -
- Rp 148,100.00 - - Rp 73,205.83 -
- Rp 250,000.00 - - Rp 192,400.00 -
JUMLAH Rp 202,030.50 Rp 688,005.83 -

Rp 95,600.00 - - Rp 669.20 - -
Rp 109,300.00 - - Rp 765.10 - -
Rp 120,000.00 - - Rp 84.00 - -
Rp 131,000.00 - - Rp 52.40 - -
- Rp 9,500.00 - - Rp 9,975.00 -
- Rp 25,000.00 - - Rp 375.00 -
JUMLAH Rp 1,570.70 Rp 10,350.00 -
Jumlah (Rp) No Uraian Pekerjaan

11 = ( 8+9+10) 1 2

C
C.1 Pondasi Batu Kali
Rp 57,360.00 C.1.1 1 m3 Pondasi Batu Belah 1 SP : 4 PP
Rp 21,860.00 Pekerja
Rp 2,400.00 Tukang Batu
Rp 3,930.00 Kepala Tukang Batu
Rp 98,000.00 Mandor
Rp 29,205.00 Batu Belah
Rp 20,205.00 Semen Portland
Rp 232,960.00 Pasir Pasang

Rp 38,240.00
Rp 21,860.00
No Uraian Pekerjaan
Rp 2,400.00
Rp 2,882.00 1 2
Rp 9,152.00 C.1.2 1 m3 Beton Mutu K225
Rp 7,184.00 Pekerja
Rp 81,718.00 Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah (Rp)
Semen Portland
11 = ( 8+9+10) Koral Beton
Pasir Beton

Rp 191,200.00
No Uraian Pekerjaan
Rp 54,650.00
Rp 6,000.00 1 2
Rp 1,310.00
C.1.3 Pembesian 1 Kg dengan Besi Polos
Rp 209,668.00 Pekerja
Rp 137,500.00 Tukang Besi
Rp 181,461.60 Kepala Tukang Besi
Rp 781,789.60 Mandor
Besi Beton Polos
Rp 157,740.00 Kawat Beton
Rp 30,057.50
Rp 3,360.00
Rp 10,873.00
No Uraian Pekerjaan
Rp 422,400.00
Rp 73,205.83 1 2
Rp 192,400.00 C.1.4 Pemasangan 1 m2 Bekisting
Rp 890,036.33 Pekerja
Tukang Kayu
Rp 669.20 Kepala Tukang Kayu
Rp 765.10 Mandor
Rp 84.00 Kayu Meranti Papan
Rp 52.40 Paku 8-12 cm
Rp 11,996.25 Minyak Bekisting
Rp 375.00
Rp 13,941.95

Rp 49,712.000
Rp 28,418.000
Rp 3,120.000
Rp 3,406.000
Rp 120,000.000
Rp 4,500.000

Rp 1,650.000
Rp 210,806.000

Rp 157,740.00
Rp 30,057.50
Rp 3,360.00
Rp 10,873.00
Rp 422,400.00
Rp 73,205.83
Rp 192,400.00
Rp 890,036.33

Rp 669.20
Rp 765.10
Rp 84.00
Rp 52.40
Rp 9,975.00
Rp 375.00
Rp 11,920.70
Harga Satuan (Rp) Jumlah yang Dibutu
Vol Koef Satuan
Upah Bahan Alat Upah

3 4 5 6 7 8 9 = (3 x 4)

PEKERJAAN PONDASI

64.72 - m3
1.5 Oh Rp 95,600.00 - - 97.08
0.75 Oh Rp 109,300.00 - - 48.54
0.075 Oh Rp 120,000.00 - - 4.854
0.075 Oh Rp 131,000.00 - - 4.854
1.2 m3 - Rp 258,750.00 - -
163 Kg - Rp 1,100.00 - -
0.52 m3 - Rp 224,500.00 - -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutu
Vol Koef Satuan
Upah Bahan Alat Upah
3 4 5 6 7 8 9 = (3 x 4)
18.234 - m3
1.65 Oh Rp 95,600.00 - - 30.0861
0.275 Oh Rp 109,300.00 - - 5.01435
0.028 Oh Rp 120,000.00 - - 0.510552
0.08 Oh Rp 131,000.00 - - 1.513422
384.00 Kg - Rp 1,100.00 - -
0.4943 m3 - Rp 148,100.00 - -
0.7696 m3
- Rp 250,000.00 - -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutu
Vol Koef Satuan
Upah Bahan Alat Upah
3 4 5 6 7 8 9 = (3 x 4)
330.751 - Kg
0.007 Oh Rp 95,600.00 - - 2.31525616
0.007 Oh Rp 109,300.00 - - 2.31525616
0.0007 Oh Rp 120,000.00 - - 0.23152562
0.0004 Oh Rp 131,000.00 - - 0.13230035
1.05 Kg - Rp 9,500.00 - -
0.015 Kg - Rp 25,000.00 - -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutu
Vol Koef Satuan
Upah Bahan Alat Upah
3 4 5 6 7 8 9 = (3 x 4)
16.8 - m2
0.520 Oh Rp 95,600.00 - - 8.736
0.260 Oh Rp 109,300.00 - - 4.368
0.026 Oh Rp 120,000.00 - - 0.4368
0.026 Oh Rp 131,000.00 - - 0.4368
0.040 m3 - Rp 3,000,000.00 - -
0.300 Kg - Rp 15,000.00 - -
0.100 Liter - Rp 16,500.00 - -
Jumlah
Total
KEBUTUHAN BAHAN DAN UPA

Jumlah yang Dibutuhkan Harga Material (Rp)


Bahan Alat Upah Bahan Alat

10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

- - Rp 9,280,848.00 - -
- - Rp 5,305,422.00 - -
- - Rp 582,480.00 - -
- - Rp 635,874.00 - -
77.664 - - Rp 20,095,560.00 -
10549.36 - - Rp 11,604,296.00 -
33.6544 - - Rp 7,555,412.80 -
Jumlah Rp 15,804,624.00 Rp 39,255,268.80 -
Total Rp 55,059,892.80
Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat
10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

- - Rp 2,876,231.16 - -
- - Rp 548,068.46 - -
- - Rp 61,266.24 - -
- - Rp 198,258.28 - -
7001.856 - - Rp 7,702,041.60 -
9.0130662 - - Rp 1,334,835.10 -
14.0328864 - - Rp 3,508,221.60 -
Jumlah Rp 3,683,824.14 Rp 12,545,098.30 -
Total Rp 16,228,922.44
Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat
10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- - Rp 221,338.49 - -
- - Rp 253,057.50 - -
- - Rp 27,783.07 - -
- - Rp 17,331.35 - -
347.288424 - - Rp 3,299,240.03 -
4.9612632 - - Rp 124,031.58 -
Jumlah Rp 519,510.41 Rp 3,423,271.61 -
Total Rp 3,942,782.02
Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat
10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

- - Rp 835,161.60 - -
- - Rp 477,422.40 - -
- - Rp 52,416.00 - -
- - Rp 57,220.80 - -
0.672 - - Rp 2,016,000.00 -
5.04 - - Rp 75,600.00 -
1.68 - - Rp 27,720.00 -
Jumlah Rp 1,422,220.80 Rp 2,119,320.00 -
Total Rp 3,541,540.80
HAN BAHAN DAN UPAH PEKERJAAN PONDASI

No Uraian Pekerjaan Vol

1 2 3

C.2 Pondasi Rollag Bata


C.2.1 Pemasangan 1m2 Bata Merah 1 SP : 4 PP 6.942
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Batu Bata Merah
Semen Portland
Pasir Pasang

No Uraian Pekerjaan Vol


1 2 3
C.2.2 Pemasangan 1m2 Plesteran 1SP : 4PP
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Pasang

No Uraian Pekerjaan Vol

1 2 3
C.3 Pondasi Strauss Pile (Kedalaman 6m)

C.3.1
Pemasangan Pile Cap
C.3.1.1 1 m3 Pekejraan Lantai Kerja 1 PC : 3 PS : 5 KRL 0.2364
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
PC (50 kg)
Pasir Beton
Split Pecah Mesin 2/3

No Uraian Pekerjaan Vol


1 2 3
C.3.1.2 Membuat 1 m3 Beton Mutu K225 3.1000
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Koral Beton
Pasir Beton

No Uraian Pekerjaan Vol


1 2 3
C.3.1.3 Pembesian 1 Kg dengan Besi Ulir 291.3404
Pekerja

Tukang Besi

Kepala Tukang Besi


Mandor
Besi Beton Ulir
Kawat Beton

No Uraian Pekerjaan Vol

1 2 3
C.3.1.4 Pemasangan 1m2 Bekisting 3.4
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Meranti Papan
Paku 8-12 cm
Minyak Bekisting

No Uraian Pekerjaan Vol


1 2 3
C.3.2 Pemasangan Strauss Pile (Kedalaman 6m)
C.3.2.1 Membuat 1 m3 Beton Mutu K225 12.1233
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Koral Beton
Pasir Beton

No Uraian Pekerjaan Vol


1 2 3
C.3.2.2 Pembesian 1 Kg dengan Besi Polos 1031.773
Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Besi Beton Polos
Kawat Beton
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Koef Satuan
Upah Bahan Alat Upah Bahan

4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)

- m2
0.60 Oh Rp 95,600.00 - - 4.1652 -
0.20 Oh Rp 109,300.00 - - 1.3884 -
0.02 Oh Rp 120,000.00 - - 0.13884 -
0.03 Oh Rp 131,000.00 - - 0.20826 -
140 Buah - Rp 700.00 - - 971.88
26.55 Kg - Rp 1,100.00 - - 184.3101
0.09 m3 - Rp 224,500.00 - - 0.62478
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Koef Satuan
Upah Bahan Alat Upah Bahan
4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)
- m2
0.4 Oh Rp 95,600.00 - - 0 -
0.2 Oh Rp 109,300.00 - - 0 -
0.02 Oh Rp 120,000.00 - - 0 -
0.022 Oh Rp 131,000.00 - - 0 -
8.32 Kg - Rp 1,100.00 - - 0
0.032 m3 - Rp 224,500.00 - - 0
Jumlah
Total

Harga Satuan (Rp) Jumlah yang Dibutuhkan


Koef Satuan
Upah Bahan Alat Upah Bahan
4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)
- m3
2 Oh Rp 95,600.00 - - 0.472875 -
0.5 Oh Rp 109,300.00 - - 0.11821875 -
0.05 Oh Rp 120,000.00 - - 0.011821875 -
0.01 Oh Rp 131,000.00 - - 0.002364375 -
3.956 zak - Rp 53,000.00 - - 0.93534675
0.55 m3 - Rp 250,000.00 - - 0.130040625
0.93 m3
- Rp 195,120.00 - - 0.219886875
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Koef Satuan
Upah Bahan Alat Upah Bahan
4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)
- m3
1.65 Oh Rp 95,600.00 - - 5.115 -
0.275 Oh Rp 109,300.00 - - 0.8525 -
0.028 Oh Rp 120,000.00 - - 0.0868 -
0.08 Oh Rp 131,000.00 - - 0.2573 -
384.00 Kg - Rp 1,100.00 - - 1190.4
0.4943 m3
- Rp 148,100.00 - - 1.53233
0.7696 m3 - Rp 250,000.00 - - 2.38576
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Koef Satuan
Upah Bahan Alat Upah Bahan
4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)
- Kg
0.007 Oh Rp 95,600.00 - - 2.0393828 -

0.007 Oh Rp 109,300.00 - - 2.0393828 -


0.0007 Oh Rp 120,000.00 - - 0.20393828 -
0.0004 Oh Rp 131,000.00 - - 0.11653616 -
1.05 Kg - Rp 11,425.00 - - 305.90742
0.015 Kg - Rp 25,000.00 - - 4.370106
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Koef Satuan
Upah Bahan Alat Upah Bahan
4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)
- m2
0.520 Oh Rp 95,600.00 - - 1.768 -
0.260 Oh Rp 109,300.00 - - 0.884 -
0.026 Oh Rp 120,000.00 - - 0.0884 -
0.026 Oh Rp 131,000.00 - - 0.0884 -
0.040 m3 - Rp 3,000,000.00 - - 0.136
0.300 Kg - Rp 15,000.00 - - 1.02
0.100 Liter - Rp 16,500.00 - - 0.34
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Koef Satuan
Upah Bahan Alat Upah Bahan
4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)

- m3
1.65 Oh Rp 95,600.00 - - 20.003445 -
0.275 Oh Rp 109,300.00 - - 3.3339075 -
0.028 Oh Rp 120,000.00 - - 0.3394524 -
0.08 Oh Rp 131,000.00 - - 1.0062339 -
384.00 Kg - Rp 1,100.00 - - 4655.3472
0.4943 m3 - Rp 148,100.00 - - 5.99254719
0.7696 m3 - Rp 250,000.00 - - 9.33009168
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Koef Satuan
Upah Bahan Alat Upah Bahan
4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)
- Kg
0.007 Oh Rp 95,600.00 - - 7.22241135 -
0.007 Oh Rp 109,300.00 - - 7.22241135 -
0.0007 Oh Rp 120,000.00 - - 0.722241135 -
0.0004 Oh Rp 131,000.00 - - 0.41270922 -
1.05 Kg - Rp 9,500.00 - - 1083.3617025
0.015 Kg - Rp 25,000.00 - - 15.47659575
Jumlah
Total
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat

11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

- Rp 398,193.12 - -
- Rp 151,752.12 - -
- Rp 16,660.80 - -
- Rp 27,282.06 - -
- - Rp 680,316.00 -
- - Rp 202,741.11 -
- - Rp 140,263.11 -
lah Rp 593,888.10 Rp 1,023,320.22 -
tal Rp 1,617,208.32
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

- Rp - - -
- Rp - - -
- Rp - - -
- Rp - - -
- - Rp - -
- - Rp - -
lah Rp - Rp - -
tal Rp -

ang Dibutuhkan Harga Material (Rp)


Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- Rp 45,206.85 - -
- Rp 12,921.31 - -
- Rp 1,418.63 - -
- Rp 309.73 - -
- - Rp 49,573.38 -
- - Rp 32,510.16 -
- - Rp 42,904.33 -
lah Rp 59,856.52 Rp 124,987.86 -
tal Rp 184,844.38
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

- Rp 488,994.00 - -
- Rp 93,178.25 - -
- Rp 10,416.00 - -
- Rp 33,706.30 - -
- - Rp 1,309,440.00 -
- - Rp 226,938.07 -
- - Rp 596,440.00 -
lah Rp 626,294.55 Rp 2,132,818.07 -
tal Rp 2,759,112.62
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

- Rp 194,965.00 - -

- Rp 222,904.54 - -
- Rp 24,472.59 - -
- Rp 15,266.24 - -
- - Rp 3,494,992.27 -
- - Rp 109,252.65 -
lah Rp 457,608.37 Rp 3,604,244.92 Rp -
tal Rp 4,061,853.29
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- Rp 169,020.80 - -
- Rp 96,621.20 - -
- Rp 10,608.00 - -
- Rp 11,580.40 - -
- - Rp 408,000.00 -
- - Rp 15,300.00 -
- - Rp 5,610.00 -
lah Rp 287,830.40 Rp 428,910.00 Rp -
tal Rp 716,740.40
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

- Rp 1,912,329.34 - -
- Rp 364,396.09 - -
- Rp 40,734.29 - -
- Rp 131,816.64 - -
- - Rp 5,120,881.92 -
- - Rp 887,496.24 -
- - Rp 2,332,522.92 -
lah Rp 2,449,276.36 Rp 8,340,901.08 Rp -
tal Rp 10,790,177.44
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

- Rp 690,462.53 - -
- Rp 789,409.56 - -
- Rp 86,668.94 - -
- Rp 54,064.91 - -
- - Rp 10,291,936.17 -
- - Rp 386,914.89 -
lah Rp 1,620,605.93 Rp 10,678,851.07 Rp -
tal Rp 12,299,457.00
No Detail Pondasi
Pondasi Batu Kali Tipe 1
Lebar Atas = 0.8 m

= 1.6 m
Lebar Bawah
Tinggi = 0.8 m
1 Panjang = 20 m
Luas = 0.96 m2

Volume = 19.2 m3

No Detail Pondasi
Pondasi Batu Kali Tipe 2
Lebar Atas = 0.4 m
Lebar Bawah = 0.8 m
Tinggi = 0.8 m
Panjang = 27.15 m
2
Luas = 0.48 m2
Volume = 13.032 m3

No Detail Pondasi
Pondasi Batu Kali Tipe 3
Lebar Atas = 0.8 m
Lebar Bawah = 1.6 m
Tinggi = 0.8 m
Panjang = 26.5 m
3 Luas = 0.96 m2

Volume = 25.44 m3
No Detail Pondasi
Pondasi Batu Kali Tipe 4
Lebar Atas = 0.4 m
Lebar Bawah = 0.8 m
Tinggi = 0.8 m
Panjang = 10.35 m
4
Luas = 0.48 m2

Volume = 4.968 m3

No Detail Pondasi
Pondasi Batu Kali Tipe 7
Panjang = 6.5 m
Lebar = 0.8 m
Tinggi = 0.4 m
Luas = 0.32 m2
5
Volume = 2.08 m3

Detail Perhitungan Volume Bekisting


No
Pondasi Batu Kali P1
Panjang = 20 m

1 Lebar = 1.8 m
Tinggi = 0.1 m
Luas = 4 m2
Detail Perhitungan Volume Bekisting
No
Pondasi Batu Kali P3
Panjang = 26.5 m
Lebar = 1.8 m
3 Tinggi = 0.1 m
Luas = 5.3 m2

TOTAL VOLUME
PERHITUNGAN VOLUME PEKERJAAN PONDASI

Detail Pondasi
Pondasi P1 (Batu Kali)
7A-10A = 10 m

7G-10G = 10 m

Total = 20 m
Pondasi P2 (Batu Kali)
7B-10B = 10 m
7E-10E = 10 m
10E-10G = 4 m
10A-10B = 3.15 m
Total = 27.15 m
Detail Pondasi Pondasi P3 (Batu Kali)
11A-11G = 14 m
2A-1'A = 2.5 m
10A-11A = 5 m
10G-11G = 5 m
Total = 26.5 m
Pondasi P4 (Batu Kali)
9E-9G = 4 m
9A-9B = 3.15 m
9A'-9B' = 1.2 m
8A-A' = 2 m
Detail Pondasi Total = 10.35 m
Pondasi P5 (Pondasi Teras)
B7'-E7' = 6.85 m
1'C-1"C = 3.5 m
1'D-1"D = 3 m
Total = 13.35 m
Pondasi P7
1"D - 1"C = 3 m
1"D-1"D = 3.5 m
Total = 6.5 m
Detail Pondasi

Detail Pondasi

Detail Perhitungan Volume Bekisting


No
Pondasi Batu Kali P2
Panjang = 27.15 m

2 Lebar = 1 m
Tinggi = 0.1 m
Luas = 5.43 m2
Detail Perhitungan Volume Bekisting
No
Pondasi Batu Kali P4
Panjang = 10.35 m
Lebar = 1 m
4 Tinggi = 0.1 m
Luas = 2.07 m2

LUME 16.8 m2
NDASI

No Detail Plat Beton


Pondasi Batu Kali Tipe 1

= 20 m
Panjang
1 = 1.8 m
Lebar
Tinggi = 0.1 m
Luas = 0.18 m2

Volume = 3.6 m3
No Detail Plat Beton
Pondasi Batu Kali Tipe 2
Panjang = 27.15 m
Lebar = 1 m
2
Tinggi = 0.1 m
Luas = 0.1 m2

Volume = 2.715 m3
No Detail Plat Beton
Pondasi Batu Kali Tipe 3
Panjang = 26.5 m
Lebar = 1.8 m
3 Tinggi = 0.1 m
Luas = 0.18 m2

Volume = 4.77 m3
No Detail Plat Beton
Pondasi Batu Kali Tipe 4
Panjang = 10.35 m
Lebar = 1 m
4
Tinggi = 0.1 m
Luas = 0.1 m2
Volume = 1.035 m3

No Detail Rabat Beton

Pondasi Batu Kali Tipe 1


Lebar Atas = 1.826 m
Lebar Bawah = 1.8 m
Tinggi = 0.05 m
1 Panjang = 20 m
Luas = 0.091 m2

Volume = 1.813 m3

No Detail Rabat Beton


Pondasi Batu Kali Tipe 2
Lebar Atas = 1.026 m
Lebar Bawah = 1 m
Tinggi = 0.05 m
Panjang = 27.15 m
2 Luas = 0.0507 m2
Volume = 1.375 m3

No Detail Rabat Beton


Pondasi Batu Kali Tipe 3
Lebar Atas = 1.826 m
Lebar Bawah = 1.8 m
Tinggi = 0.05 m
Panjang = 26.5 m
3 Luas = 0.091 m2

Volume = 2.402 m3

No Detail Rabat Beton


Pondasi Batu Kali Tipe 4
Lebar Atas = 1.026 m
Lebar Bawah = 1 m
Tinggi = 0.05 m
Panjang = 10.35 m
4
Luas = 0.0507 m2

Volume = 0.524 m3
4

No Detail Rollag Bata


Tipe Pondasi P5
Tebal = 0.3 m
Lebar = 0.52 m
Panjang = 13.35 m
Volume = 6.942 m2
1
No Tipe Pondasi

1 P1 (Batu Kali)

2 P2 (Batu Kali)

3 P3 (Batu Kali)

4 P4(Batu Kali)

No Tipe Pondasi

1 P1 (Batu Kali)

2 P2 (Batu Kali)

3 P3 (Batu Kali)

4 P4 (Batu Kali)
TOTAL VOLUME TULANG
Detail Penulangan P

Panjang Tulangan
Tulangan Panjang Bentang (m)
(m)

20 1.792

27.15 1

26.5 1.792

10.35 1

TOTAL VOLUME TULANGAN 1

Tulangan Panjang (m) Jumlah

20 6

27.15 4

26.5 6

10.35 4
TOTAL VOLUME TULANGAN 2
Detail Penulangan Plat Beton

a (m) b (m) c (m) Jumlah

0.024 1.744 0.024 67.67

0.024 0.952 0.024 91.5

0.024 1.744 0.024 89.33

0.024 0.952 0.024 35.5

ME TULANGAN 1

Berat Tulangan (kg/m') Volume (Kg)

0.395 47.4

0.395 42.897

0.395 62.805

0.395 16.353
169.455
No

Berat Tulangan (kg/m') Volume (Kg)

0.395 47.897

1
0.395 36.143

0.395 63.234

0.395 14.023

161.296
2

3
TOTAL
Lantai Kerja

Strauss P1

Panjang Pile Cap = 0.5 m


Lebar Pile Cap = 0.5 m
Tinggi Lantai Kerja = 0.05 m
Diameter Strauss = 0.35 m
Luas Pile Cap = 0.25 m2
Luas Strauss = 0.096 m2
Luas Lantai Kerja = 0.154 m2
Jumlah Lantai Kerja = 11 Buah
Letak Lantai Kerja : 7C,5B,5C,5D,4C,4D,4F,3C,2C,1D,1
Volume Lantai Kerja = 0.0846 m3
Strauss P2
Panjang Pile Cap = 0.8 m
Lebar Pile Cap = 0.5 m
Tinggi Lantai Kerja = 0.05 m
Diameter Strauss = 0.35 m
Luas Pile Cap = 0.4 m2
Luas Strauss = 0.096 m2
Luas Lantai Kerja = 0.304 m2

Jumlah Lantai Kerja = 8 Buah


Letak Lantai Kerja : 7B,7E,6A,5G,4A,4G,3A,1G
Volume Lantai Kerja = 0.1215 m3
Strauss P2 A
Panjang Pile Cap = 0.8 m
Lebar Pile Cap = 0.5 m
Tinggi Lantai Kerja = 0.05 m
Diameter Strauss = 0.35 m
Luas Pile Cap = 0.4 m2

Luas Strauss = 0.096 m2


Luas Lantai Kerja = 0.304 m2
Jumlah Lantai Kerja = 2 Buah
Letak Lantai Kerja : 7A, 7G
= m3
Volume Lantai Kerja 0.0304
TOTAL 0.2364
No PILE CAP

Strauss P1

Panjang Pile Cap = 0.5 m


Lebar Pile Cap = 0.5 m
Tinggi Pile Cap = 0.4 m
1
Luas Pile Cap = 0.25 m2
Jumlah Pile Cap = 11 Buah
Volume Pile Cap = 1.100 m3

D,4C,4D,4F,3C,2C,1D,1F

Strauss P2
Panjang Pile Cap = 0.8 m
Lebar Pile Cap = 0.5 m
Tinggi Pile Cap = 0.5 m
Luas Pile Cap = 0.4 m2
2
Jumlah Pile Cap = 8 Buah
Volume Pile Cap = 1.600 m3

A,5G,4A,4G,3A,1G

Strauss P2A
Panjang Pile Cap = 0.8 m
Lebar Pile Cap = 0.5 m
Tinggi Pile Cap = 0.5 m
Luas Pile Cap = 0.4 m2
3 Jumlah Pile Cap = 2 Buah
Volume Pile Cap = 0.400 m3

a : 7A, 7G
TOTAL VOLUME (m3)
PILE CAP
No Posisi

1 A

2 B

Letak Pile Cap : 7C,5B,5C,5D,4C,4D,4F,3C,2C,1D,1F

3 C

Letak Pile Cap : 7B,7E,6A,5G,4A,4G,3A,1G 4 D

Letak Pile Cap : 7A, 7G No Posisi


3.1000
1 A

2 B

3 C

4 D

No Posisi

1 A

2 B

3 C
3 C

4 D

TOT
Detail Penulangan Pile Cap 1

Panjang
Tulangan Panjang Bentang (m) Jumlah
Tulangan (m)

0.5 0.712 3.00

0.5 0.667 3.00

0.5 0.730 3.00

0.5 0.686 3.00

TOTAL VOLUME (PER 1 Pile Cap)

TOTAL VOLUME KESELURUHAN

Detail Penulangan Pile Cap 2


Panjang
Tulangan Panjang Bentang (m) Jumlah
Tulangan (m)
0.8 1.021 6.33

0.8 0.977 6.33

0.5 0.686 4.33

0.5 0.730 4.33

TOTAL VOLUME (PER 1 Pile Cap)

TOTAL VOLUME KESELURUHAN

Detail Penulangan Pile Cap 2A


Panjang
Tulangan Panjang Bentang (m) Jumlah
Tulangan (m)

0.8 1.021 6.33

0.8 0.977 6.33

0.5 0.686 4.33


0.5 0.686 4.33

0.5 0.730 4.33

TOTAL VOLUME (PER 1 Pile Cap)

TOTAL VOLUME KESELURUHAN

TOTAL VOLUME PENULANGAN PILE CAP (PC 1 + PC 2 + PC 2A)


1 Detail Perhitungan Volume Bekisting
No
Berat Tulangan (kg/m') Volume (Kg) Pile Cap 1

Panjang = 0.5 m
1.04 2.221 Lebar = 0.5 m
1
Tinggi = 0.4 m
Luas = 0.8 m2
1.04 2.081 Detail Perhitungan Volume Bekisting
No
Pile Cap 2A
Panjang = 0.8 m
Lebar = 0.5 m
3
Tinggi = 0.5 m
Luas = 1.3 m2
1.04 2.278
TOTAL VOLUME

No DETAIL PONDASI

1.04 2.140

8.720

1
95.9244

2
Berat Tulangan (kg/m') Volume (Kg)
1.04 6.725

1.04 6.435

1.04 3.092

1.04 3.290

19.542

156.3328

A
Berat Tulangan (kg/m') Volume (Kg)

1.04 6.725

1.04 6.435

1.04 3.092
1.04 3.092

1.04 3.290

19.542

39.0832

A) 291.3404
Detail Perhitungan Volume Bekisting
No
Pile Cap 2

Panjang = 0.8 m
Lebar = 0.5 m
2
Tinggi = 0.5 m
Luas = 1.3 m2

AL VOLUME 3.4 m2

Diameter (m) Kedalaman (m) Jumlah Volume (m3) Volume Total (m3)

0.35 6 21 0.5773 12.1233


Detail Penulangan Pondasi Strauss
No Posisi Panjang
Kedalaman
Tulangan Tulangan Jumlah
(m)
(m)

1 Tul Pokok 6 6.000 8.00

2 Tul Sengkang 6 0.390 41.00

TOTAL
Penulangan Pondasi Strauss

Berat Tulangan (kg/m') Volume (Kg) Total Volume (Kg)

0.892 42.816 899.136

0.395 6.316 132.637

1031.773
REKAPITULASI RENCANA

NO URUTAN PEKERJAAN VOL

1 2 3
C
C.1 Pondasi Batu Kali
1 m3 Pondasi Batu Belah 1 SP : 4 PP 64.72
1 m3 Beton Mutu K225 18.234
Pembesian 1 Kg dengan Besi Polos 330.751
Pemasangan 1m2 Bekisting 16.8
C.2 Pondasi Rollag Bata
Pemasangan 1m2 Bata Merah 1 SP : 4 PP 6.942
C.3 Pondasi Strauss Pile (Kedalaman 6m)
C.3.1 Pemasangan Pile Cap
1 m3 Pekejraan Lantai Kerja 1 PC : 3 PS : 5 KRL 0.2364
Membuat 1 m3 Beton Mutu K225 3.1000
Pembesian 1 Kg dengan Besi Ulir 291.3404
Pemasangan 1m2 Bekisting Untuk Pile Cap 3.4
C.3.2 Pemasangan Strauss Pile (Kedalaman 6m)
Membuat 1 m3 Beton Mutu K225 12.1233
Pembesian 1 Kg dengan Besi Polos 1031.773

TOTAL
No Tenaga Kerja Satuan
1 2 3
1 Pekerja Oh
2 Tukang Batu Oh
3 Tukang Besi Oh
4 Tukang Kayu Oh
5 Kepala Tukang Batu Oh
6 Kepala Tukang Besi Oh
7 Kepala Tukang Kayu Oh
8 Mandor Oh
TOTAL

No Bahan Satuan
1 2 3
1 Batu Belah Pondasi m3
2 Semen Portland kg
3 Pasir Pasang m3
4 Koral Beton m3
5 Pasir Beton m3
6 Besi Beton Polos kg
7 Kawat Beton kg
8 Kayu Meranti Papan m3
9 Paku 8-12 cm kg
10 Minyak Bekisting Ltr
11 Batu Bata Merah Buah
12 PC (50Kg) zak
13 Split Pecah Mesin 2/3 m3
14 Besi Beton Ulir kg
TOTAL
PITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PONDASI

HARGA SATUAN JUMLAH HARGA


SAT
UPAH BAHAN UPAH
4 5 6 7 = (3x5)
PEKERJAAN PONDASI

m3 Rp 244,200.00 Rp 606,540.00 Rp 15,804,624.00


m3 Rp 202,030.50 Rp 688,005.83 Rp 3,683,824.14
Kg Rp 1,570.70 Rp 10,350.00 Rp 519,510.41
m2 Rp 84,656.000 Rp 126,150.000 Rp 1,422,220.80

m2 Rp 85,550.00 Rp 147,410.00 Rp 593,888.10

m3 Rp 253,160.00 Rp 528,629.60 Rp 59,856.52


m3 Rp 202,030.50 Rp 688,005.83 Rp 626,294.55
Kg Rp 1,570.70 Rp 12,371.25 Rp 457,608.37
m2 Rp 84,656.00 Rp 126,150.000 Rp 287,830.40

m3 Rp 202,030.50 Rp 688,005.83 Rp 2,449,276.36


Kg Rp 1,570.70 Rp 10,350.00 Rp 1,620,605.93

L Rp 27,525,539.57
Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah
3 4 5 6 = (4 x 5)
Oh 179.00 Rp 95,600.00 Rp 17,112,750.88
Oh 59.25 Rp 109,300.00 Rp 6,475,738.22
Oh 11.58 Rp 109,300.00 Rp 1,265,371.60
Oh 5.25 Rp 109,300.00 Rp 574,043.60
Oh 5.94 Rp 120,000.00 Rp 712,975.95
Oh 1.16 Rp 120,000.00 Rp 138,924.60
Oh 0.53 Rp 120,000.00 Rp 63,024.00
Oh 9.03 Rp 131,000.00 Rp 1,182,710.71
L Rp 27,525,539.57

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah


3 4 5 6 = (4 x 5)
m3 77.664 Rp 258,750.00 Rp 20,095,560.00
kg 23581.2733 Rp 1,100.00 Rp 25,939,400.63
m3 34.27918 Rp 224,500.00 Rp 7,695,675.91
m3 16.53794339 Rp 148,100.00 Rp 2,449,269.42
m3 25.878778705 Rp 250,000.00 Rp 6,469,694.68
kg 1430.6501265 Rp 9,500.00 Rp 13,591,176.20
kg 24.80796495 Rp 25,000.00 Rp 620,199.12
m3 0.808 Rp 3,000,000.00 Rp 2,424,000.00
kg 6.06 Rp 15,000.00 Rp 90,900.00
Ltr 2.02 Rp 16,500.00 Rp 33,330.00
Buah 971.88 Rp 700.00 Rp 680,316.00
zak 0.93534675 Rp 53,000.00 Rp 49,573.38
m3 0.219886875 Rp 195,120.00 Rp 42,904.33
kg 305.90742 Rp 11,425.00 Rp 3,494,992.27

L Rp 83,676,991.94
JUMLAH HARGA TOTAL HARGA
BAHAN (UPAH+BAHAN)
8 = (3x6) 9 = (7+8)

Rp 39,255,268.80 Rp 55,059,892.80
Rp 12,545,098.30 Rp 16,228,922.44
Rp 3,423,271.61 Rp 3,942,782.02
Rp 2,119,320.00 Rp 3,541,540.80

Rp 1,023,320.22 Rp 1,617,208.32

Rp 124,987.86 Rp 184,844.38
Rp 2,132,818.07 Rp 2,759,112.62
Rp 3,604,244.92 Rp 4,061,853.29
Rp 428,910.00 Rp 716,740.40

Rp 8,340,901.08 Rp 10,790,177.44
Rp 10,678,851.07 Rp 12,299,457.00

Rp 83,676,991.94 Rp 111,202,531.50
ANALISA HARGA SATUAN P

Harga Satuan (Rp)


NO URAIAN KOEF SAT
Upah
1 2 3 4 5
D PEKERJAAN
D.1 PEKERJAAN TIE BEAM
D.1.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Pekerja 1.65 Oh Rp 95,600.00
Tukang Batu 0.275 Oh Rp 109,300.00
Kepala Tukang Batu 0.028 Oh Rp 120,000.00
Mandor 0.083 Oh Rp 131,000.00
Semen Portland 371 Kg -
Pasir Beton 698 Kg -
Kerikil 1047 Kg -
Air 215 Ltr -
JUMLAH
D.1.2 Pembesian 10 Kg dengan besi ulir
Pekerja 0.07 Oh Rp 95,600.00
Tukang Batu 0.07 Oh Rp 109,300.00
Kepala Tukang Batu 0.007 Oh Rp 120,000.00
Mandor 0.004 Oh Rp 131,000.00
Besi Beton Ulir 10.5 Kg -
Kawat Beton 0.15 Kg -
JUMLAH
D.1.3 Pembesian 10 Kg dengan besi polos
Pekerja 0.07 Oh Rp 95,600.00
Tukang Batu 0.07 Oh Rp 109,300.00
Kepala Tukang Batu 0.007 Oh Rp 120,000.00
Mandor 0.004 Oh Rp 131,000.00
Besi Beton Polos 10.5 Kg -
Kawat Beton 0.15 Kg -
JUMLAH
D.1.4 Pemasangan 1 m2 Bekisting untuk tie beam
Pekerja 0.52 Oh Rp 95,600.00
Tukang Kayu 0.26 Oh Rp 109,300.00
Kepala Tukang Kayu 0.026 Oh Rp 120,000.00
Mandor 0.026 Oh Rp 131,000.00
Kayu Kelas III (Papan Albasia) 0.045 m3 -
Paku 5-10 cm 0.3 Kg -
Minyak Bekisting 0.1 Liter -
JUMLAH
D.2 PEKERJAAN KOLOM
D.2.1 Pekerjaan 1 m3 Mutu Beton K-225 / f'c = 19,3 Mpa
Pekerja 1.65 Oh Rp 95,600.00
Tukang Batu 0.275 Oh Rp 109,300.00
Kepala Tukang Batu 0.028 Oh Rp 120,000.00
Mandor 0.083 Oh Rp 131,000.00
Semen Portland 371 Kg -
Pasir Beton 698 Kg -
Kerikil 1047 Kg -
Air 215 Ltr -
JUMLAH
D.2.2 Pembesian 10 Kg dengan besi Ulir
Pekerja 0.07 Oh Rp 95,600.00
Tukang Batu 0.07 Oh Rp 109,300.00
Kepala Tukang Batu 0.007 Oh Rp 120,000.00
Mandor 0.004 Oh Rp 131,000.00
Besi Beton Ulir 10.5 Kg -
Kawat Beton 0.15 Kg -
JUMLAH
D.2.3 Pembesian 10 Kg dengan besi polos
Pekerja 0.07 Oh Rp 95,600.00
Tukang Batu 0.07 Oh Rp 109,300.00
Kepala Tukang Batu 0.007 Oh Rp 120,000.00
Mandor 0.004 Oh Rp 131,000.00
Besi Beton Polos 10.5 Kg -
Kawat Beton 0.15 Kg -
JUMLAH
D.2.4 Pemasangan 1m2 Bekisting Untuk Kolom
Pekerja 0.660 Oh Rp 95,600.00
Tukang Kayu 0.330 Oh Rp 109,300.00
Kepala Tukang Kayu 0.033 Oh Rp 120,000.00
Mandor 0.033 Oh Rp 131,000.00
Kayu Kelas III (Papan Albasia) 0.04 m3 -
Paku 8-12 cm 0.300 Kg -
Minyak Bekisting 0.100 Liter -
Balok Kayu Kelas II (Balok Albasia) 0.015 m3 -
Triplek 9 mm 120 x 240 0.350 Lbr -
Dolken Kayu Ø 8-10 cm panj. 4m 2.000 Batang -
JUMLAH
D.3 PEKERJAAN BALOK
D.3.1 Pekerjaan 1 m3 Mutu Beton K-225 / f'c = 19,3 Mpa
Pekerja 1.65 Oh Rp 95,600.00
Tukang Batu 0.275 Oh Rp 109,300.00
Kepala Tukang Batu 0.028 Oh Rp 120,000.00
Mandor 0.083 Oh Rp 131,000.00
Semen Portland 371 Kg -
Pasir Beton 698 Kg -
Kerikil 1047 Kg -
Air 215 Ltr -
JUMLAH
D.3.2 Pembesian 10 Kg dengan besi ulir
Pekerja 0.07 Oh Rp 95,600.00
Tukang Batu 0.07 Oh Rp 109,300.00
Kepala Tukang Batu 0.007 Oh Rp 120,000.00
Mandor 0.004 Oh Rp 131,000.00
Besi Beton Ulir 10.5 Kg -
Kawat Beton 0.15 Kg -
JUMLAH
D.3.3 Pembesian 10 Kg dengan besi polos
Pekerja 0.07 Oh Rp 95,600.00
Tukang Batu 0.07 Oh Rp 109,300.00
Kepala Tukang Batu 0.007 Oh Rp 120,000.00
Mandor 0.004 Oh Rp 131,000.00
Besi Beton Polos 10.5 Kg -
Kawat Beton 0.15 Kg -
JUMLAH
D.3.4 Pemasangan 1m2 Bekisting Untuk Balok
Pekerja 0.660 Oh Rp 95,600.00
Tukang Kayu 0.330 Oh Rp 109,300.00
Kepala Tukang Kayu 0.033 Oh Rp 120,000.00
Mandor 0.033 Oh Rp 131,000.00
Kayu Kelas III (Papan Albasia) 0.04 m3 -
Paku 5-10 cm 0.300 Kg -
Minyak Bekisting 0.100 Liter -
Balok Kayu Kelas II (Balok Albasia) 0.015 m3 -
Triplek 9 mm 120 x 240 0.350 Lebar -
Dolken Kayu Ø 8-10 cm panj. 4m 2.000 Batang -
JUMLAH
D.4 PEKERJAAN PLAT LANTAI
D.4.1 Pekerjaan 1 m3 Mutu Beton K-225 / f'c = 19,3 Mpa
Pekerja 1.65 Oh Rp 95,600.00
Tukang Batu 0.275 Oh Rp 109,300.00
Kepala Tukang Batu 0.028 Oh Rp 120,000.00
Mandor 0.083 Oh Rp 131,000.00
Semen Portland 371 Kg -
Pasir Beton 698 Kg -
Kerikil 1047 Kg -
Air 215 Ltr -
JUMLAH
D.4.2 Pembesian 10 Kg dengan besi polos
Pekerja 0.07 Oh Rp 95,600.00
Tukang Batu 0.07 Oh Rp 109,300.00
Kepala Tukang Batu 0.007 Oh Rp 120,000.00
Mandor 0.004 Oh Rp 131,000.00
Besi Beton 10.5 Kg -
Kawat Beton 0.15 Kg -
JUMLAH
D.4.3 Pemasangan 1m2 Bekisting Untuk Plat Lantai
Pekerja 0.660 Oh Rp 95,600.00
Tukang Kayu 0.330 Oh Rp 109,300.00
Kepala Tukang Kayu 0.033 Oh Rp 120,000.00
Mandor 0.033 Oh Rp 131,000.00
Kayu Kelas III (Papan Albasia) 0.04 m3 -
Paku 5-10 cm 0.4 Kg -
Minyak Bekisting 0.2 Liter -
Balok Kayu Kelas II (Balok Albasia) 0.015 m3 -
Triplek 9 mm 120 x 240 0.350 Lebar -
Dolken Kayu Ø 8-10 cm panj. 4m 6.000 Batang -
JUMLAH
D.5 PEKERJAAN RING BALOK
D.5.1 Pekerjaan 1 m3 Mutu Beton K-225 / f'c = 19,3 Mpa
Pekerja 1.65 Oh Rp 95,600.00
Tukang Batu 0.275 Oh Rp 109,300.00
Kepala Tukang Batu 0.028 Oh Rp 120,000.00
Mandor 0.083 Oh Rp 131,000.00
Semen Portland 371 Kg -
Pasir Beton 698 Kg -
Kerikil 1047 Kg -
Air 215 Ltr -
JUMLAH
D.5.2 Pembesian 10 Kg dengan besi polos
Pekerja 0.07 Oh Rp 95,600.00
Tukang Batu 0.07 Oh Rp 109,300.00
Kepala Tukang Batu 0.007 Oh Rp 120,000.00
Mandor 0.004 Oh Rp 131,000.00
Besi Beton 10.5 Kg -
Kawat Beton 0.15 Kg -
JUMLAH
D.5.3 Pemasangan 1m2 Bekisting Untuk Ringbalok
Pekerja 0.520 Oh Rp 95,600.00
Tukang Kayu 0.260 Oh Rp 109,300.00
Kepala Tukang Kayu 0.026 Oh Rp 120,000.00
Mandor 0.026 Oh Rp 131,000.00
Kayu Kelas III (Papan Albasia) 0.04 m3 -
Paku 5-10 cm 0.4 Kg -
Minyak Bekisting 0.2 Liter -
JUMLAH
D.6 PEKERJAAN PLAT ATAP
D.6.1 Pekerjaan 1 m3 Mutu Beton K-225 / f'c = 19,3 Mpa
Pekerja 1.65 Oh Rp 95,600.00
Tukang Batu 0.275 Oh Rp 109,300.00
Kepala Tukang Batu 0.028 Oh Rp 120,000.00
Mandor 0.083 Oh Rp 131,000.00
Semen Portland 371 Kg -
Pasir Beton 698 Kg -
Kerikil 1047 Kg -
Air 215 Ltr -
JUMLAH
D.6.2 Pembesian 10 Kg dengan besi polos
Pekerja 0.07 Oh Rp 95,600.00
Tukang Batu 0.07 Oh Rp 109,300.00
Kepala Tukang Batu 0.007 Oh Rp 120,000.00
Mandor 0.004 Oh Rp 131,000.00
Besi Beton 10.5 Kg -
Kawat Beton 0.15 Kg -
JUMLAH
D.6.3 Pemasangan 1m2 Bekisting Untuk Plat Atap
Pekerja 0.520 Oh Rp 95,600.00
Tukang Kayu 0.260 Oh Rp 109,300.00
Kepala Tukang Kayu 0.026 Oh Rp 120,000.00
Mandor 0.026 Oh Rp 131,000.00
Kayu Kelas III (Papan Albasia) 0.04 m3 -
Paku 5-10 cm 0.4 Kg -
Minyak Bekisting 0.2 Liter -
Balok Kayu Kelas II (Balok Albasia) 0.015 m3 -
Triplek 9 mm 120 x 240 0.350 Lebar -
Dolken Kayu Ø 8-10 cm panj. 4m 2.000 Batang -
JUMLAH
D.7 PEKERJAAN TANGGA
D.7.1 Pekerjaan 1 m3 Mutu Beton K-225 / f'c = 19,3 Mpa
Pekerja 1.65 Oh Rp 95,600.00
Tukang Batu 0.275 Oh Rp 109,300.00
Kepala Tukang Batu 0.028 Oh Rp 120,000.00
Mandor 0.083 Oh Rp 131,000.00
Semen Portland 371 Kg -
Pasir Beton 698 Kg -
Kerikil 1047 Kg -
Air 215 Ltr -
JUMLAH
D.7.2 Pembesian 10 Kg dengan besi polos
Pekerja 0.07 Oh Rp 95,600.00
Tukang Batu 0.07 Oh Rp 109,300.00
Kepala Tukang Batu 0.007 Oh Rp 120,000.00
Mandor 0.004 Oh Rp 131,000.00
Besi Beton 10.5 Kg -
Kawat Beton 0.15 Kg -
JUMLAH
D.7.3 Pemasangan 1m2 Bekisting Untuk Tangga
Pekerja 0.520 Oh Rp 95,600.00
Tukang Kayu 0.260 Oh Rp 109,300.00
Kepala Tukang Kayu 0.026 Oh Rp 120,000.00
Mandor 0.026 Oh Rp 131,000.00
Kayu Kelas III (Papan Albasia) 0.03 m3 -
Paku 5-10 cm 0.4 Kg -
Minyak Bekisting 0.15 Liter -
Kayu Kelas II (Balok Albasia) 0.015 m3 -
Triplek 9 mm 120 x 240 0.35 Lbr -
Dolken Kayu Ø 8-10 cm panj. 4m 2 Batang -
JUMLAH
A HARGA SATUAN PEKERJAAN BETON

Harga Satuan (Rp) Jumlah Harga (Rp)


Bahan Alat Upah Bahan Alat
6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)
PEKERJAAN BETON

- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -

- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 11,425.00 - - Rp 119,962.50 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 123,712.50 -

- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -

- - Rp 49,712.00 - -
- - Rp 28,418.00 - -
- - Rp 3,120.00 - -
- - Rp 3,406.00 - -
Rp 1,815,000.00 - - Rp 81,675.00 -
Rp 15,000.00 - - Rp 4,500.00 -
Rp 16,500.00 - - Rp 1,650.00 -
Rp 84,656.00 Rp 87,825.00 -

- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -

- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 11,425.00 - - Rp 119,962.50 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 123,712.50 -

- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -

- - Rp 63,096.00 - -
- - Rp 36,069.00 - -
- - Rp 3,960.00 - -
- - Rp 4,323.00 - -
Rp 1,815,000.00 - - Rp 72,600.00 -
Rp 15,000.00 - - Rp 4,500.00 -
Rp 16,500.00 - - Rp 1,650.00 -
Rp 1,705,000.00 - - Rp 25,575.00 -
Rp 111,000.00 - - Rp 38,850.00 -
Rp 25,000.00 - - Rp 50,000.00 -
Rp 107,448.00 Rp 193,175.00 -
- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -

- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 11,425.00 - - Rp 119,962.50 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 123,712.50 -

- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -

- - Rp 63,096.00 - -
- - Rp 36,069.00 - -
- - Rp 3,960.00 - -
- - Rp 4,323.00 - -
Rp 1,815,000.00 - - Rp 72,600.00 -
Rp 15,000.00 - - Rp 4,500.00 -
Rp 16,500.00 - - Rp 1,650.00 -
Rp 1,705,000.00 - - Rp 25,575.00 -
Rp 111,000.00 - - Rp 38,850.00 -
Rp 25,000.00 - - Rp 50,000.00 -
Rp 107,448.00 Rp 193,175.00 -

- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -

- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -

- - Rp 63,096.00 - -
- - Rp 36,069.00 - -
- - Rp 3,960.00 - -
- - Rp 4,323.00 - -
Rp 1,815,000.00 - - Rp 72,600.00 -
Rp 15,000.00 - - Rp 6,000.00 -
Rp 16,500.00 - - Rp 3,300.00 -
Rp 1,705,000.00 - - Rp 25,575.00 -
Rp 111,000.00 - - Rp 38,850.00 -
Rp 25,000.00 - - Rp 150,000.00 -
Rp 107,448.00 Rp 296,325.00 -

- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -

- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -

- - Rp 49,712.00 - -
- - Rp 28,418.00 - -
- - Rp 3,120.00 - -
- - Rp 3,406.00 - -
Rp 1,815,000.00 - - Rp 72,600.00 -
Rp 15,000.00 - - Rp 6,000.00 -
Rp 16,500.00 - - Rp 3,300.00 -
Rp 84,656.00 Rp 81,900.00 -

- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -

- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -

- - Rp 49,712.00 - -
- - Rp 28,418.00 - -
- - Rp 3,120.00 - -
- - Rp 3,406.00 - -
Rp 1,815,000.00 - - Rp 72,600.00 -
Rp 15,000.00 - - Rp 6,000.00 -
Rp 16,500.00 - - Rp 3,300.00 -
Rp 1,705,000.00 - - Rp 25,575.00 -
Rp 111,000.00 - - Rp 38,850.00 -
Rp 25,000.00 - - Rp 50,000.00 -
Rp 84,656.00 Rp 196,325.00 -
- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -

- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -

- - Rp 49,712.00 - -
- - Rp 28,418.00 - -
- - Rp 3,120.00 - -
- - Rp 3,406.00 - -
Rp 1,815,000.00 - - Rp 54,450.00 -
Rp 15,000.00 - - Rp 6,000.00 -
Rp 16,500.00 - - Rp 2,475.00 -
Rp 1,705,000.00 - - Rp 25,575.00 -
Rp 111,000.00 - - Rp 38,850.00 -
Rp 25,000.00 - - Rp 50,000.00 -
Rp 84,656.00 Rp 177,350.00 -
Jumlah (Rp) No Uraian Pekerjaan

11 = ( 8+9+10) 1 2
D
D.1 PEKERJAAN TIE BEAM
D.1.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Rp 157,740.00 Pekerja
Rp 30,057.50 Tukang Batu
Rp 3,360.00 Kepala Tukang Batu
Rp 10,873.00 Mandor
Rp 408,100.00 Semen Portland
Rp 124,942.00 Pasir Beton
Rp 145,533.00 Kerikil
Rp 1,720.00 Air
Rp 882,325.50

Rp 6,692.00
No Uraian Pekerjaan
Rp 7,651.00
Rp 840.00 1 2
Rp 524.00 D.1.2 Pembesian 10 Kg dengan besi ulir
Rp 119,962.50 Pekerja
Rp 3,750.00 Tukang Batu
Rp 139,419.50 Kepala Tukang Batu
Mandor
Rp 6,692.00 Besi Beton
Rp 7,651.00 Kawat Beton
Rp 840.00
Rp 524.00
Rp 99,750.00
No Uraian Pekerjaan
Rp 3,750.00
Rp 119,207.00 1 2
D.1.3 Pembesian 10 Kg dengan besi polos
Rp 49,712.00 Pekerja
Rp 28,418.00 Tukang Batu
Rp 3,120.00 Kepala Tukang Batu
Rp 3,406.00 Mandor
Rp 81,675.00 Besi Beton
Rp 4,500.00 Kawat Beton
Rp 1,650.00
Rp 172,481.00

No Uraian Pekerjaan

Rp 157,740.00 1 2
Rp 30,057.50 D.1.4 Pemasangan Bekisting untuk tie beam
Rp 3,360.00 Pekerja
Rp 10,873.00 Tukang Kayu
Rp 408,100.00 Kepala Tukang Kayu
Rp 124,942.00 Mandor
Rp 145,533.00 Kayu Kelas III (Papan Albasia)
Rp 1,720.00 Paku 5-10 cm
Rp 882,325.50 Minyak Bekisting

Rp 6,692.00
Rp 7,651.00
No Uraian Pekerjaan
Rp 840.00
Rp 524.00 1 2
Rp 119,962.50 D.2 PEKERJAAN KOLOM
Rp 3,750.00 D.2.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Rp 139,419.50 Pekerja
Tukang Batu
Rp 6,692.00 Kepala Tukang Batu
Rp 7,651.00 Mandor
Rp 840.00 Semen Portland
Rp 524.00 Pasir Beton
Rp 99,750.00 Kerikil
Rp 3,750.00 Air
Rp 119,207.00

Rp 63,096.00
No Uraian Pekerjaan
Rp 36,069.00
Rp 3,960.00 1 2
Rp 4,323.00 D.2.2 Pembesian 10 Kg dengan besi Ulir
Rp 72,600.00 Pekerja
Rp 4,500.00 Tukang Batu
Rp 1,650.00 Kepala Tukang Batu
Rp 25,575.00 Mandor
Rp 38,850.00 Besi Beton Ulir
Rp 50,000.00 Kawat Beton
Rp 300,623.00

No Uraian Pekerjaan
No Uraian Pekerjaan
Rp 157,740.00
Rp 30,057.50 1 2
Rp 3,360.00 D.2.3 Pembesian 10 Kg dengan besi Polos
Rp 10,873.00 Pekerja
Rp 408,100.00 Tukang Batu
Rp 124,942.00 Kepala Tukang Batu
Rp 145,533.00 Mandor
Rp 1,720.00 Besi Beton Polos
Rp 882,325.50 Kawat Beton

Rp 6,692.00
Rp 7,651.00
No Uraian Pekerjaan
Rp 840.00
Rp 524.00 1 2
Rp 119,962.50 D.2.4 Pemasangan 1m2 Bekisting Untuk Kolom
Rp 3,750.00 Pekerja
Rp 139,419.50 Tukang Kayu
Kepala Tukang Kayu
Rp 6,692.00 Mandor
Rp 7,651.00 Kayu Kelas III (Papan Albasia)
Rp 840.00 Paku 8-12 cm
Rp 524.00 Minyak Bekisting
Rp 99,750.00 Balok Kayu Kelas II (Balok Albasia)
Rp 3,750.00 Triplek 9 mm 120 x 240
Rp 119,207.00 Dolken Kayu Ø 8-10 cm panj. 4m

Rp 63,096.00
Rp 36,069.00
No Uraian Pekerjaan
Rp 3,960.00
Rp 4,323.00 1 2
Rp 72,600.00 D.3 PEKERJAAN BALOK
Rp 4,500.00 D.3.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Rp 1,650.00 Pekerja
Rp 25,575.00 Tukang Batu
Rp 38,850.00 Kepala Tukang Batu
Rp 50,000.00 Mandor
Rp 300,623.00 Semen Portland
Pasir Beton
Kerikil
Rp 157,740.00 Air
Rp 30,057.50
Rp 3,360.00
Rp 10,873.00
No Uraian Pekerjaan
No Uraian Pekerjaan
Rp 408,100.00
Rp 124,942.00 1 2
Rp 145,533.00 D.3.2 Pembesian 10 Kg dengan besi ulir
Rp 1,720.00 Pekerja
Rp 882,325.50 Tukang Batu
Kepala Tukang Batu
Rp 6,692.00 Mandor
Rp 7,651.00 Besi Beton Ulir
Rp 840.00 Kawat Beton
Rp 524.00
Rp 99,750.00
Rp 3,750.00
No Uraian Pekerjaan
Rp 119,207.00
1 2
Rp 63,096.00 D.3.3 Pembesian 10 Kg dengan besi polos
Rp 36,069.00 Pekerja
Rp 3,960.00 Tukang Batu
Rp 4,323.00 Kepala Tukang Batu
Rp 72,600.00 Mandor
Rp 6,000.00 Besi Beton Polos
Rp 3,300.00 Kawat Beton
Rp 25,575.00
Rp 38,850.00
Rp 150,000.00
No Uraian Pekerjaan
Rp 403,773.00
1 2
D.3.4 Pemasangan 1m2 Bekisting Untuk Balok
Rp 157,740.00 Pekerja
Rp 30,057.50 Tukang Kayu
Rp 3,360.00 Kepala Tukang Kayu
Rp 10,873.00 Mandor
Rp 408,100.00 Kayu Kelas III (Papan Albasia)
Rp 124,942.00 Paku 5-10 cm
Rp 145,533.00 Minyak Bekisting
Rp 1,720.00 Balok Kayu Kelas II (Balok Albasia)
Rp 882,325.50 Triplek 9 mm 120 x 240
Dolken Kayu Ø 8-10 cm panj. 4m
Rp 6,692.00
Rp 7,651.00
Rp 840.00
No Uraian Pekerjaan
Rp 524.00
Rp 99,750.00 1 2
Rp 3,750.00 D.4 PEKERJAAN PLAT LANTAI
Rp 119,207.00 D.4.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Pekerja
Rp 49,712.00 Tukang Batu
Rp 28,418.00 Kepala Tukang Batu
Rp 3,120.00 Mandor
Rp 3,406.00 Semen Portland
Rp 72,600.00 Pasir Beton
Rp 6,000.00 Kerikil
Rp 3,300.00 Air
Rp 166,556.00

No Uraian Pekerjaan
Rp 157,740.00
Rp 30,057.50 1 2
Rp 3,360.00 D.4.2 Pembesian 10 Kg dengan besi polos
Rp 10,873.00 Pekerja
Rp 408,100.00 Tukang Batu
Rp 124,942.00 Kepala Tukang Batu
Rp 145,533.00 Mandor
Rp 1,720.00 Besi Beton
Rp 882,325.50 Kawat Beton

Rp 6,692.00
Rp 7,651.00
No Uraian Pekerjaan
Rp 840.00
Rp 524.00 1 2
Rp 99,750.00 D.4.3 Pemasangan 1m2 Bekisting Untuk Plat Lantai
Rp 3,750.00 Pekerja
Rp 119,207.00 Tukang Kayu
Kepala Tukang Kayu
Rp 49,712.00 Mandor
Rp 28,418.00 Kayu Kelas III (Papan Albasia)
Rp 3,120.00 Paku 5-10 cm
Rp 3,406.00 Minyak Bekisting
Rp 72,600.00 Balok Kayu Kelas II (Balok Albasia)
Rp 6,000.00 Triplek 9 mm 120 x 240
Rp 3,300.00 Dolken Kayu Ø 8-10 cm panj. 4m
Rp 25,575.00
Rp 38,850.00
Rp 50,000.00
No Uraian Pekerjaan
Rp 280,981.00
1 2
D.5 PEKERJAAN RING BALOK
Rp 157,740.00 D.5.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Rp 30,057.50 Pekerja
Rp 3,360.00 Tukang Batu
Rp 10,873.00 Kepala Tukang Batu
Rp 408,100.00 Mandor
Rp 124,942.00 Semen Portland
Rp 145,533.00 Pasir Beton
Rp 1,720.00 Kerikil
Rp 882,325.50 Air

Rp 6,692.00
Rp 7,651.00
No Uraian Pekerjaan
Rp 840.00
Rp 524.00 1 2
Rp 99,750.00 D.5.2 Pembesian 10 Kg dengan besi polos
Rp 3,750.00 Pekerja
Rp 119,207.00 Tukang Batu
Kepala Tukang Batu
Rp 49,712.00 Mandor
Rp 28,418.00 Besi Beton
Rp 3,120.00 Kawat Beton
Rp 3,406.00
Rp 54,450.00
Rp 6,000.00
No Uraian Pekerjaan
Rp 2,475.00
Rp 25,575.00 1 2
Rp 38,850.00 D.5.3 Pemasangan 1m2 Bekisting Untuk Ringbalok
Rp 50,000.00 Pekerja
Rp 262,006.00 Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Kelas III (Papan Albasia)
Paku 5-10 cm
Minyak Bekisting

No Uraian Pekerjaan
1 2
D.6 PEKERJAAN PELAT ATAP
D.6.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Beton
Kerikil
Air

No Uraian Pekerjaan
1 2
D.6.2 Pembesian 10 Kg dengan besi polos
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Besi Beton
Kawat Beton

No Uraian Pekerjaan
1 2
D.6.3 Pemasangan 1m2 Bekisting Untuk Plat Atap
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Kelas III (Papan Albasia)
Paku 5-10 cm
Minyak Bekisting
Balok Kayu Kelas II (Balok Albasia)
Triplek 9 mm 120 x 240
Dolken Kayu Ø 8-10 cm panj. 4m

No Uraian Pekerjaan

1 2
D.7 PEKERJAAN TANGGA
D.7.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Beton
Kerikil
Air

No Uraian Pekerjaan
1 2
D.7.2 Pembesian 10 Kg dengan besi polos
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Besi Beton
Kawat Beton

No Uraian Pekerjaan
1 2
D.7.3 Pemasangan 1m2 Bekisting Untuk Tangga
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Kelas III (Papan Albasia)
Paku 5-10 cm
Minyak Bekisting
Kayu Kelas II (Balok Albasia)
Triplek 9 mm 120 x 240
Dolken Kayu Ø 8-10 cm panj. 4m
KEBUTUHAN BAHAN DAN TENAGA KERJA PEKERJAAN BET

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
PEKERJAAN BETON

tu K-225 / f'c = 19,3 Mpa 3.671 - m3


1.65 Oh Rp 95,600.00 - -
0.275 Oh Rp 109,300.00 - -
0.028 Oh Rp 120,000.00 - -
0.083 Oh Rp 131,000.00 - -
371 Kg - Rp 1,100.00 -
698 Kg - Rp 179.00 -
1047 Kg - Rp 139.00 -
215 Ltr - Rp 8.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
ir 11.9637 - Kg
0.07 Oh Rp 95,600.00 - -
0.07 Oh Rp 109,300.00 - -
0.007 Oh Rp 120,000.00 - -
0.004 Oh Rp 131,000.00 - -
10.5 Kg - Rp 11,425.00 -
0.15 Kg - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
olos 58.878 - Kg
0.07 Oh Rp 95,600.00 - -
0.07 Oh Rp 109,300.00 - -
0.007 Oh Rp 120,000.00 - -
0.004 Oh Rp 131,000.00 - -
10.5 Kg - Rp 9,500.00 -
0.15 Kg - Rp 25,000.00 -
J
Harga Satuan (Rp)
Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
beam 45.373 - m2
0.52 Oh Rp 95,600.00 - -
0.26 Oh Rp 109,300.00 - -
0.026 Oh Rp 120,000.00 - -
0.026 Oh Rp 131,000.00 - -
0.045 m3 - Rp 1,815,000.00 -
0.3 Kg - Rp 15,000.00 -
0.1 Liter - Rp 16,500.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8

tu K-225 / f'c = 19,3 Mpa 11.664 - m3


1.65 Oh Rp 95,600.00 - -
0.275 Oh Rp 109,300.00 - -
0.028 Oh Rp 120,000.00 - -
0.083 Oh Rp 131,000.00 - -
371 Kg - Rp 1,100.00 -
698 Kg - Rp 179.00 -
1047 Kg - Rp 139.00 -
215 Ltr - Rp 8.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
lir 45.848 - Kg
0.07 Oh Rp 95,600.00 -
0.07 Oh Rp 109,300.00 -
0.007 Oh Rp 120,000.00 -
0.004 Oh Rp 131,000.00 -
10.5 Kg - Rp 11,425.00
0.15 Kg - Rp 25,000.00
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
olos 222.754 - Kg
0.07 Oh Rp 95,600.00 - -
0.07 Oh Rp 109,300.00 - -
0.007 Oh Rp 120,000.00 - -
0.004 Oh Rp 131,000.00 - -
10.5 Kg - Rp 9,500.00 -
0.15 Kg - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
uk Kolom 266.173 - m2
0.660 Oh Rp 95,600.00 - -
0.330 Oh Rp 109,300.00 - -
0.033 Oh Rp 120,000.00 - -
0.033 Oh Rp 131,000.00 - -
0.04 m3 - Rp 1,815,000.00 -
0.300 Kg - Rp 15,000.00 -
0.100 Liter - Rp 16,500.00 -
asia) 0.015 m3 - Rp 1,705,000.00 -
0.350 Lbr - Rp 111,000.00 -
m 2.000 Batang - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8

tu K-225 / f'c = 19,3 Mpa 9.160 - m3


1.65 Oh Rp 95,600.00 - -
0.275 Oh Rp 109,300.00 - -
0.028 Oh Rp 120,000.00 - -
0.083 Oh Rp 131,000.00 - -
371 Kg - Rp 1,100.00 -
698 Kg - Rp 179.00 -
1047 Kg - Rp 139.00 -
215 Ltr - Rp 8.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
ir 31.9819 - Kg
0.07 Oh Rp 95,600.00 - -
0.07 Oh Rp 109,300.00 - -
0.007 Oh Rp 120,000.00 - -
0.004 Oh Rp 131,000.00 - -
10.5 Kg - Rp 11,425.00 -
0.15 Kg - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
olos 125.860 - Kg
0.07 Oh Rp 95,600.00 - -
0.07 Oh Rp 109,300.00 - -
0.007 Oh Rp 120,000.00 - -
0.004 Oh Rp 131,000.00 - -
10.5 Kg - Rp 9,500.00 -
0.15 Kg - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
uk Balok 154.020 - m2
0.660 Oh Rp 95,600.00 - -
0.330 Oh Rp 109,300.00 - -
0.033 Oh Rp 120,000.00 - -
0.033 Oh Rp 131,000.00 - -
0.04 m3 - Rp 1,815,000.00 -
0.300 Kg - Rp 15,000.00 -
0.100 Liter - Rp 16,500.00 -
asia) 0.015 m3 - Rp 1,705,000.00 -
0.350 Lebar - Rp 111,000.00 -
m 2.000 Batang - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
tu K-225 / f'c = 19,3 Mpa 21.723 - m3
1.65 Oh Rp 95,600.00 - -
0.275 Oh Rp 109,300.00 - -
0.028 Oh Rp 120,000.00 - -
0.083 Oh Rp 131,000.00 - -
371 Kg - Rp 1,100.00 -
698 Kg - Rp 179.00 -
1047 Kg - Rp 139.00 -
215 Ltr - Rp 8.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
olos 157.196 - Kg
0.07 Oh Rp 95,600.00 - -
0.07 Oh Rp 109,300.00 - -
0.007 Oh Rp 120,000.00 - -
0.004 Oh Rp 131,000.00 - -
10.5 Kg - Rp 9,500.00 -
0.15 Kg - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
uk Plat Lantai 184.079 - m2
0.660 Oh Rp 95,600.00 - -
0.330 Oh Rp 109,300.00 - -
0.033 Oh Rp 120,000.00 - -
0.033 Oh Rp 131,000.00 - -
0.04 m3 - Rp 1,815,000.00 -
0.4 Kg - Rp 15,000.00 -
0.2 Liter - Rp 16,500.00 -
asia) 0.015 m3 - Rp 1,705,000.00 -
0.350 Lebar - Rp 111,000.00 -
m 6.000 Batang - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
tu K-225 / f'c = 19,3 Mpa 4.679 - m3
1.65 Oh Rp 95,600.00 - -
0.275 Oh Rp 109,300.00 - -
0.028 Oh Rp 120,000.00 - -
0.083 Oh Rp 131,000.00 - -
371 Kg - Rp 1,100.00 -
698 Kg - Rp 179.00 -
1047 Kg - Rp 139.00 -
215 Ltr - Rp 8.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
olos 90.031 - Kg
0.07 Oh Rp 95,600.00 - -
0.07 Oh Rp 109,300.00 - -
0.007 Oh Rp 120,000.00 - -
0.004 Oh Rp 131,000.00 - -
10.5 Kg - Rp 9,500.00 -
0.15 Kg - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
uk Ringbalok 71.985 -
0.520 Oh Rp 95,600.00 - -
0.260 Oh Rp 109,300.00 - -
0.026 Oh Rp 120,000.00 - -
0.026 Oh Rp 131,000.00 - -
0.04 m3 - Rp 1,815,000.00 -
0.4 Kg - Rp 15,000.00 -
0.2 Liter - Rp 16,500.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8

tu K-225 / f'c = 19,3 Mpa 5.347 - m3


1.65 Oh Rp 95,600.00 - -
0.275 Oh Rp 109,300.00 - -
0.028 Oh Rp 120,000.00 - -
0.083 Oh Rp 131,000.00 - -
371 Kg - Rp 1,100.00 -
698 Kg - Rp 179.00 -
1047 Kg - Rp 139.00 -
215 Ltr - Rp 8.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
olos 58.801 - Kg
0.07 Oh Rp 95,600.00 - -
0.07 Oh Rp 109,300.00 - -
0.007 Oh Rp 120,000.00 - -
0.004 Oh Rp 131,000.00 - -
10.5 Kg - Rp 9,500.00 -
0.15 Kg - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
uk Plat Atap 53.465 - m2
0.520 Oh Rp 95,600.00 - -
0.260 Oh Rp 109,300.00 - -
0.026 Oh Rp 120,000.00 - -
0.026 Oh Rp 131,000.00 - -
0.04 m3 - Rp 1,815,000.00 -
0.4 Kg - Rp 15,000.00 -
0.2 Liter - Rp 16,500.00 -
asia) 0.015 m3 - Rp 1,705,000.00 -
0.350 Lebar - Rp 111,000.00 -
m 2.000 Batang - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8

tu K-225 / f'c = 19,3 Mpa 3.294 - m3


1.65 Oh Rp 95,600.00 - -
0.275 Oh Rp 109,300.00 - -
0.028 Oh Rp 120,000.00 - -
0.083 Oh Rp 131,000.00 - -
371 Kg - Rp 1,100.00 -
698 Kg - Rp 179.00 -
1047 Kg - Rp 139.00 -
215 Ltr - Rp 8.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
olos 37.549 - Kg
0.07 Oh Rp 95,600.00 - -
0.07 Oh Rp 109,300.00 - -
0.007 Oh Rp 120,000.00 - -
0.004 Oh Rp 131,000.00 - -
10.5 Kg - Rp 9,500.00 -
0.15 Kg - Rp 25,000.00 -
J

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan Alat
2 3 4 5 6 7 8
uk Tangga 20.947 - m2
0.520 Oh Rp 95,600.00 - -
0.260 Oh Rp 109,300.00 - -
0.026 Oh Rp 120,000.00 - -
0.026 Oh Rp 131,000.00 - -
0.03 m3 - Rp 1,815,000.00 -
0.4 Kg - Rp 15,000.00 -
0.15 Liter - Rp 16,500.00 -
0.015 m3 - Rp 1,705,000.00 -
0.35 Lbr - Rp 111,000.00 -
m 2 Batang - Rp 25,000.00 -
J
PEKERJAAN BETON

Jumlah yang Dibutuhkan Harga Material (Rp)


Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

6.05785125 - - Rp 579,130.58 - -
1.00964188 - - Rp 110,353.86 - -
0.1027999 - - Rp 12,335.99 - -
0.30472828 - - Rp 39,919.40 - -
- 1362.098675 - - Rp 1,498,308.54 -
- 2562.65465 - - Rp 458,715.18 -
- 3843.981975 - - Rp 534,313.49 -
- 789.356375 - - Rp 6,314.85 -
Jumlah Rp 741,739.83 Rp 2,497,652.07 -
Total Rp 3,239,391.90
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

0.83746208 - - Rp 80,061.37 - -
0.83746208 - - Rp 91,534.61 - -
0.08374621 - - Rp 10,049.54 - -
0.04785498 - - Rp 6,269.00 - -
- 125.619312 - - Rp 1,435,200.64 -
- 1.7945616 - - Rp 44,864.04 -
Jumlah Rp 187,914.53 Rp 1,480,064.68 -
Total Rp 1,667,979.21
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

4.121 - - Rp 394,009.59 - -
4.121 - - Rp 450,473.30 - -
0.412 - - Rp 49,457.27 - -
0.236 - - Rp 30,851.92 - -
- 618.216 - - Rp 5,873,050.83 -
- 8.832 - - Rp 220,791.38 -
Jumlah Rp 924,792.07 Rp 6,093,842.21 -
Total Rp 7,018,634.29
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

23.59396 - - Rp 2,255,582.58 - -
11.79698 - - Rp 1,289,409.91 - -
1.179698 - - Rp 141,563.76 - -
1.179698 - - Rp 154,540.44 - -
- 2.041785 - - Rp 3,705,839.78 -
- 13.6119 - - Rp 204,178.50 -
- 4.5373 - - Rp 74,865.45 -
Jumlah Rp 3,841,096.69 Rp 3,984,883.73 -
Total Rp 7,825,980.41
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

19.2454977 - - Rp 1,839,869.58 - -
3.20758295 - - Rp 350,588.82 - -
0.32659026 - - Rp 39,190.83 - -
0.96810685 - - Rp 126,822.00 - -
- 4327.320998 - - Rp 4,760,053.10 -
- 8141.428724 - - Rp 1,457,315.74 -
- 12212.143086 - - Rp 1,697,487.89 -
- 2507.74667 - - Rp 20,061.97 -
Jumlah Rp 2,356,471.23 Rp 7,934,918.70 -
Total Rp 10,291,389.93
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

3.209388 - - Rp 306,817.49 - -
3.209388 - - Rp 350,786.11 - -
0.3209388 - - Rp 38,512.66 - -
0.1833936 - - Rp 24,024.56 - -
- 481.4082 - - Rp 5,500,088.69 -
- 6.87726 - - Rp 171,931.50 -
Jumlah Rp 720,140.82 Rp 5,672,020.19 -
Total Rp 6,392,161.00
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

15.592752 - - Rp 1,490,667.09 - -
15.592752 - - Rp 1,704,287.79 - -
1.5592752 - - Rp 187,113.02 - -
0.8910144 - - Rp 116,722.89 - -
- 2338.9128016 - - Rp 22,219,671.62 -
- 33.413040023 - - Rp 835,326.00 -
Jumlah Rp 3,498,790.80 Rp 23,054,997.62 -
Total Rp 26,553,788.41
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

175.674378 - - Rp 16,794,470.54 - -
87.837189 - - Rp 9,600,604.76 - -
8.7837189 - - Rp 1,054,046.27 - -
8.7837189 - - Rp 1,150,667.18 - -
- 10.646932 - - Rp 19,324,181.58 -
- 79.85199 - - Rp 1,197,779.85 -
- 26.61733 - - Rp 439,185.95 -
- 3.9925995 - - Rp 6,807,382.15 -
- 93.160655 - - Rp 10,340,832.71 -
- 532.3466 - - Rp 13,308,665.00 -
Jumlah Rp 28,599,788.74 Rp 51,418,027.23 -
Total Rp 80,017,815.97
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

15.1135578 - - Rp 1,444,856.13 - -
2.5189263 - - Rp 275,318.64 - -
0.2564725 - - Rp 30,776.70 - -
0.76025776 - - Rp 99,593.77 - -
- 3398.260572 - - Rp 3,738,086.63 -
- 6393.492936 - - Rp 1,144,435.24 -
- 9590.239404 - - Rp 1,333,043.28 -
- 1969.34238 - - Rp 15,754.74 -
Jumlah Rp 1,850,545.24 Rp 6,231,319.88 -
Total Rp 8,081,865.12
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

2.23873104 - - Rp 214,022.69 - -
2.23873104 - - Rp 244,693.30 - -
0.2238731 - - Rp 26,864.77 - -
0.12792749 - - Rp 16,758.50 - -
- 335.809656 - - Rp 3,836,625.32 -
- 4.7972808 - - Rp 119,932.02 -
Jumlah Rp 502,339.26 Rp 3,956,557.34 -
Total Rp 4,458,896.60
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

8.81023391 - - Rp 842,258.36 - -
8.81023391 - - Rp 962,958.57 - -
0.88102339 - - Rp 105,722.81 - -
0.50344194 - - Rp 65,950.89 - -
- 1321.5350868 - - Rp 12,554,583.32 -
- 18.879072669 - - Rp 471,976.82 -
Jumlah Rp 1,976,890.63 Rp 13,026,560.14 -
Total Rp 15,003,450.77
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

101.653042 - - Rp 9,718,030.78 - -
50.8265208 - - Rp 5,555,338.72 - -
5.08265208 - - Rp 609,918.25 - -
5.08265208 - - Rp 665,827.42 - -
- 6.1607904 - - Rp 11,181,834.58 -
- 46.205928 - - Rp 693,088.92 -
- 15.401976 - - Rp 254,132.60 -
- 2.3102964 - - Rp 3,939,055.36 -
- 53.906916 - - Rp 5,983,667.68 -
- 308.03952 - - Rp 7,700,988.00 -
Jumlah Rp 16,549,115.17 Rp 29,752,767.14 -
Total Rp 46,301,882.31
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
35.8432037 - - Rp 3,426,610.27 - -
5.97386728 - - Rp 652,943.69 - -
0.60824831 - - Rp 72,989.80 - -
1.80302176 - - Rp 236,195.85 - -
- 8059.290045 - - Rp 8,865,219.05 -
- 15162.761324 - - Rp 2,714,134.28 -
- 22744.141987 - - Rp 3,161,435.74 -
- 4670.4780584 - - Rp 37,363.82 -
Jumlah Rp 4,388,739.62 Rp 14,778,152.89 -
Total Rp 19,166,892.50
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

11.0036866 - - Rp 1,051,952.44 - -
11.0036866 - - Rp 1,202,702.95 - -
1.10036866 - - Rp 132,044.24 - -
0.62878209 - - Rp 82,370.45 - -
- 1650.5529959 - - Rp 15,680,253.46 -
- 23.579328512 - - Rp 589,483.21 -
Jumlah Rp 2,469,070.09 Rp 16,269,736.67 -
Total Rp 18,738,806.76
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

121.49181 - - Rp 11,614,617.04 - -
60.745905 - - Rp 6,639,527.42 - -
6.0745905 - - Rp 728,950.86 - -
6.0745905 - - Rp 795,771.36 - -
- 7.36314 - - Rp 13,364,099.10 -
- 73.6314 - - Rp 1,104,471.00 -
- 36.8157 - - Rp 607,459.05 -
- 2.7611775 - - Rp 4,707,807.64 -
- 64.427475 - - Rp 7,151,449.73 -
- 1104.471 - - Rp 27,611,775.00 -
Jumlah Rp 19,778,866.67 Rp 54,547,061.51 -
Total Rp 74,325,928.18
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
7.72039125 - - Rp 738,069.40 - -
1.28673188 - - Rp 140,639.79 - -
0.1310127 - - Rp 15,721.52 - -
0.38835908 - - Rp 50,875.04 - -
- 1735.918275 - - Rp 1,909,510.10 -
- 3265.95945 - - Rp 584,606.74 -
- 4898.939175 - - Rp 680,952.55 -
- 1005.990375 - - Rp 8,047.92 -
Jumlah Rp 945,305.76 Rp 3,183,117.31 -
Total Rp 4,128,423.07
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

6.30219514 - - Rp 602,489.86 - -
6.30219514 - - Rp 688,829.93 - -
0.63021951 - - Rp 75,626.34 - -
0.36012544 - - Rp 47,176.43 - -
- 945.3292709 - - Rp 8,980,628.07 -
- 13.50470387 - - Rp 337,617.60 -
Jumlah Rp 1,414,122.56 Rp 9,318,245.67 -
Total Rp 10,732,368.23
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

37.4322 - - Rp 3,578,518.32 - -
18.7161 - - Rp 2,045,669.73 - -
1.87161 - - Rp 224,593.20 - -
1.87161 - - Rp 245,180.91 - -
- 2.8794 - - Rp 5,226,111.00 -
- 28.794 - - Rp 431,910.00 -
- 14.397 - - Rp 237,550.50 -
Jumlah Rp 2,515,443.84 Rp 5,895,571.50 -
Total Rp 8,411,015.34
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

8.821725 - - Rp 843,356.91 - -
1.4702875 - - Rp 160,702.42 - -
0.149702 - - Rp 17,964.24 - -
0.4437595 - - Rp 58,132.49 - -
- 1983.5515 - - Rp 2,181,906.65 -
- 3731.857 - - Rp 668,002.40 -
- 5597.7855 - - Rp 778,092.18 -
- 1149.4975 - - Rp 9,195.98 -
Jumlah Rp 1,080,156.07 Rp 3,637,197.22 -
Total Rp 4,717,353.29
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

4.11608177 - - Rp 393,497.42 - -
4.11608177 - - Rp 449,887.74 - -
0.41160818 - - Rp 49,392.98 - -
0.23520467 - - Rp 30,811.81 - -
- 617.41226488 - - Rp 5,865,416.52 -
- 8.8201752125 - - Rp 220,504.38 -
Jumlah Rp 923,589.95 Rp 6,085,920.90 -
Total Rp 7,009,510.84
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

27.8018 - - Rp 2,657,852.08 - -
13.9009 - - Rp 1,519,368.37 - -
1.39009 - - Rp 166,810.80 - -
1.39009 - - Rp 182,101.79 - -
- 2.1386 - - Rp 3,881,559.00 -
- 21.386 - - Rp 320,790.00 -
- 10.693 - - Rp 176,434.50 -
- 0.801975 - - Rp 1,367,367.38 -
- 18.71275 - - Rp 2,077,115.25 -
- 106.93 - - Rp 2,673,250.00 -
Jumlah Rp 4,526,133.04 Rp 10,496,516.13 -
Total Rp 15,022,649.17
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

5.4343245 - - Rp 519,521.42 - -
0.90572075 - - Rp 98,995.28 - -
0.09221884 - - Rp 11,066.26 - -
0.27336299 - - Rp 35,810.55 - -
- 1221.89963 - - Rp 1,344,089.59 -
- 2298.88394 - - Rp 411,500.23 -
- 3448.32591 - - Rp 479,317.30 -
- 708.10895 - - Rp 5,664.87 -
Jumlah Rp 665,393.51 Rp 2,240,571.99 -
Total Rp 2,905,965.50
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

2.62841173 - - Rp 251,276.16 - -
2.62841173 - - Rp 287,285.40 - -
0.26284117 - - Rp 31,540.94 - -
0.15019496 - - Rp 19,675.54 - -
- 394.2617588 - - Rp 3,745,486.71 -
- 5.63231084 - - Rp 140,807.77 -
Jumlah Rp 589,778.04 Rp 3,886,294.48 -
Total Rp 4,476,072.52
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

10.892648 - - Rp 1,041,337.15 - -
5.446324 - - Rp 595,283.21 - -
0.5446324 - - Rp 65,355.89 - -
0.5446324 - - Rp 71,346.84 - -
- 0.628422 - - Rp 1,140,585.93 -
- 8.37896 - - Rp 125,684.40 -
- 3.14211 - - Rp 51,844.82 -
- 0.314211 - - Rp 535,729.76 -
- 7.33159 - - Rp 813,806.49 -
- 41.8948 - - Rp 1,047,370.00 -
Jumlah Rp 1,773,323.09 Rp 3,715,021.39 -
Total Rp 5,488,344.48
1. COR BETON

TIPE TB 1
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.15 0.2 1.8 4D-5D
2 0.15 0.2 1.8 4D'-5D'
Total Volume Cor (m3)
TIPE TB 2A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.15 0.25 2.2 F1-G1
2 0.15 0.25 3.12 C2-D1
3 0.15 0.25 2.2 F3'-G3'
4 0.15 0.25 2.2 F4-G4
5 0.15 0.25 3.15 A5-B5
Total Volume Cor (m3)
TIPE TB 2B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.15 0.25 3.4 D1-F1
2 0.15 0.25 3 C3-D3
3 0.15 0.25 3 C4-D4
4 0.15 0.25 2.25 B7-C7
5 0.15 0.25 3.15 A7-B7
6 0.15 0.25 3 GB-7B
7 0.15 0.25 2.2 3A-4A
8 0.15 0.25 1.8 4A-5A
9 0.15 0.25 3 6A-7A
Total Volume Cor (m3)
TIPE TB 3A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.15 0.3 3 C5-D5
2 0.15 0.3 5.4 A2-C2
3 0.15 0.3 1.5 2A-3A
4 0.15 0.3 4 5G-7G
Total Volume Cor (m3)
TIPE TB 4
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.15 0.35 4 E7-G7
2 0.15 0.35 4.6 C7-E7
Total Volume Cor (m3)
TIPE TB 5A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.2 0.35 1.47 1G-3'G
2 0.2 0.35 2.7 3'G-4G
3 0.2 0.35 1.8 4G-5G
4 0.2 0.35 1.47 1F-3'F
5 0.2 0.35 2.7 3'F-4F
6 0.2 0.35 1 1'G-1G
7 0.2 0.35 2 1D-3D
8 0.2 0.35 2.2 3D-4D
Total Volume Cor (m3)

Volume Cor Beton Tie Beam (m3)

1. COR BETON

K1
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.2 3.78 15
Lantai 2 0.13 0.2 3.805 5
Total Volume Cor (m3)
K2A
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.25 3.78 18
Lantai 2 0.13 0.25 3.805 17
Total Volume Cor (m3)
K2B
Dimensi (m)
No Jumlah
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.25 3.78 3
Lantai 2 0.13 0.25 3.805 2
Total Volume Cor (m3)
K3
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.3 3.78 4
Lantai 2 0.13 0.3 3.805 4
Total Volume Cor (m3)
K4A
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.35 3.78 3
Lantai 2 0.13 0.35 3.805 3
Total Volume Cor (m3)
K4B
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.35 3.78 2
Lantai 2 0.13 0.35 3.805 2
Total Volume Cor (m3)
KOLOM PRAKTIS
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.13 3.78 19
Lantai 2 0.13 0.13 3.805 10
Total Volume Cor (m3)

Volume Cor Beton Kolom (m3)

1. COR BETON

TIPE B1
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.2 3.09 As 9
2 0.13 0.2 3.09 As 10
3 0.13 0.2 14.94 As G
Total Volume Cor (m3)
TIPE B2A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.25 3.94 As 9
2 0.13 0.25 7.03 AS 10
3 0.13 0.25 12.2 As A
4 0.13 0.25 1.7 AS D
5 0.13 0.25 10 As G
Total Volume Cor (m3)
TIPE B2B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.25 9.29 As 1
2 0.13 0.25 3 As 3
3 0.13 0.25 4 As D
4 0.13 0.25 1.59 AS G
Total Volume Cor (m3)
TIPE B3A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.3 3.4 As 1
2 0.13 0.3 3 AS 2
3 0.13 0.3 5.54 As 4
4 0.13 0.3 4 As A
5 0.13 0.3 2.5 As C
6 0.13 0.3 6.54 As D
Total Volume Cor (m3)
TIPE B3B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.3 3 As 1
2 0.13 0.3 5.34 As 5
3 0.13 0.3 5.8 As A
Total Volume Cor (m3)
TIPE B4A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.35 10.68 As 2
2 0.13 0.35 4 AS G
Total Volume Cor (m3)
TIPE B4B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.35 3 As 4
2 0.13 0.35 6.91 As 7
3 0.13 0.35 5.24 As C
4 0.13 0.35 7 AS G
Total Volume Cor (m3)
TIPE B5B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.2 0.35 5.33 As 3
2 0.2 0.35 13.87 As 7
3 0.2 0.35 5.8 AS C
Total Volume Cor (m3)
TIPE 6A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.2 0.4 8.54 As 5
Total Volume Cor (m3)
TIPE 6B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.2 0.4 5.33 As 3
2 0.2 0.4 5.33 As 4
Total Volume Cor (m3)
TIPE BC 1
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.12 0.2 3.4 As 1
2 0.12 0.2 9.883 As 7
Total Volume Cor (m3)
TIPE BC 2
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.12 0.25 3 As 7
Total Volume Cor (m3)

Volume Cor Beton Balok (m3)

1. COR BETON
Dimensi (m)
Nama Luas (m2)
Panjang Lebar Tinggi
4.2 3.15 0.12 13.23
R. Pembantu
2 3.15 0.12 6.3
Kanopi Jendela 1.17 0.5 0.1 0.585
3.15 2 0.12 6.3
Teras Belakang
6.6 0.9 0.12 5.94
Kanopi Jendela 0.5 2.3 0.1 1.15
Bagian 1 8.6 5.8 0.12 49.88
Bagian 2 5.4 5.8 0.12 31.32
Bagian 3 (Bordes Tang 2.2 1.5 0.12 3.3
Bagian 4 6.4 4.2 0.12 26.88
Bagian 5 5.4 2.2 0.12 11.88
3.332 0.935 0.12 3.11542
Bagian 6
1.216 2.933 0.12 3.566528
3.5 4.184 0.12 14.644
Bagian 7 (depan)
4.549 0.5 0.12 2.2745
Kanopi Depan 1.9 0.5 0.12 0.95
Total Cor Beton Pelat Lantai (m3)

1. COR BETON

TIPE RB 1
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.2 2.2 3B-4B
Total Cor Beton Ring Balok (m3)
TIPE RB 2
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.25 2 1G-3G
2 0.13 0.25 2.2 3G-4G
3 0.13 0.25 1.8 4G-5G
4 0.13 0.25 4 5G-7G
5 0.13 0.25 2.2 F7-G7
6 0.13 0.25 2.2 F5-G5
7 0.13 0.25 2.2 F2-G2
8 0.13 0.25 3.4 D1-F1
9 0.13 0.25 3 C1-D1
10 0.13 0.25 2.25 B3-C3
11 0.13 0.25 3.15 A3-B3
12 0.13 0.25 1.575 A4-B'4
13 0.13 0.25 1.575 A6-B'6
14 0.13 0.25 1.575 A7-B'7
15 0.13 0.25 2.25 B3-C3
16 0.13 0.25 3.825 B'4-C4
17 0.13 0.25 3.825 B'6-C6
18 0.13 0.25 3.825 B'7-C7
19 0.13 0.25 3 C5-D5
20 0.13 0.25 10 1F-7F
Total Cor Beton Ring Balok (m3)
TIPE RB 3
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.3 6.4 C7-F7
2 0.13 0.3 3.4 D5-F5
3 0.13 0.3 5 5E-7E
4 0.13 0.3 5 5D-7D
5 0.13 0.3 5 5C-7C
6 0.13 0.3 2.2 3C-4C
7 0.13 0.3 5.4 A4-C4
8 0.13 0.3 9 3A-7A
9 0.13 0.3 6 1C-4C
Total Cor Beton Ring Balok (m3)
TIPE RB 4
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.35 5.8 4B'-7B'
2 0.13 0.35 6 1C-5C
3 0.13 0.35 6.4 C3'-F3'
Total Cor Beton Ring Balok (m3)

Volume Cor Beton Ring Balok (m3)

1. COR BETON

Dimensi (m)
AS Luas (m2)
Panjang Lebar Tinggi
Panjang : 1G-7G
10 2.2 0.1 22
Lebar : F1-G1
Panjang : A3-C3
5.4 2.2 0.1 11.88
Lebar : 3A-4A
Panjang : 4A-7A
5.8 1.575 0.1 9.135
Lebar : A4-B'4
1.15 3 0.1 3.45
Bagian Depan
4.15 1 0.1 4.15
Kanopi Jendela 1 1.9 0.5 0.1 0.95
Kanopi Jendela 2 1.9 0.5 0.1 0.95
Kanopi Jendela 3 1.9 0.5 0.1 0.95
Total Cor Beton Pelat Atap (m3)

1. COR BETON

Dimensi Tangga
Antrede = 0.27 m
Optrede = 0.18 m
Lebar Tangga = 1 m
Jumlah Anak Tangga = 21 Buah
Panjang = 2.2 m
Dimensi Bordes Lebar= 1.5 m
Tebal= 0.15 m
Panjang Sisi Miring Pla = 3.12 m
Panjang Sisi Miring Pla = 3.287 m

Volume Beton
Vol. Cor Anak Tangga = 1.021 m3
Vol. Bordes = 0.495 m3
Vol. Balok Bordes = 0.120 m3
Tebal Pelat = 0.120 m
Vol. Bawah Tangga 1 = 0.374 m3
Vol. Bawah Tangga 2 = 0.394 m3
Vol. Pelat Tangga = 0.769 m3
Total Volume Cor 3.294 m3
VOLUME PEKERJAAN BETON

TIE BEAM

N 2. BEKISTING

TIPE TB 1
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.03 0.0540 1 0.15 0.2 1.8
0.03 0.0540 2 0.15 0.2 1.8
0.108 Total Volume Bekisting (m2)
TIPE TB 2A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0375 0.0825 1 0.15 0.25 2.2
0.0375 0.1170 2 0.15 0.25 3.12
0.0375 0.0825 3 0.15 0.25 2.2
0.0375 0.0825 4 0.15 0.25 2.2
0.0375 0.1181 5 0.15 0.25 3.15
0.483 Total Volume Bekisting (m2)
TIPE TB 2B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0375 0.1275 1 0.15 0.25 3.4
0.0375 0.1125 2 0.15 0.25 3
0.0375 0.1125 3 0.15 0.25 3
0.0375 0.0844 4 0.15 0.25 2.25
0.0375 0.1181 5 0.15 0.25 3.15
0.0375 0.1125 6 0.15 0.25 3
0.0375 0.0825 7 0.15 0.25 2.2
0.0375 0.0675 8 0.15 0.25 1.8
0.0375 0.1125 9 0.15 0.25 3
0.930 Total Volume Bekisting (m2)
TIPE TB 3A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.045 0.1350 1 0.15 0.3 3
0.045 0.2430 2 0.15 0.3 5.4
0.045 0.0675 3 0.15 0.3 1.5
0.045 0.1800 4 0.15 0.3 4
0.626 Total Volume Bekisting (m2)
TIPE TB 4
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0525 0.2100 1 0.15 0.35 4
0.0525 0.2415 2 0.15 0.35 4.6
0.452 Total Volume Bekisting (m3)
TIPE TB 5A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.07 0.1029 1 0.2 0.35 1.47
0.07 0.1890 2 0.2 0.35 2.7
0.07 0.1260 3 0.2 0.35 1.8
0.07 0.1029 4 0.2 0.35 1.47
0.07 0.1890 5 0.2 0.35 2.7
0.07 0.0700 6 0.2 0.35 1
0.07 0.1400 7 0.2 0.35 2
0.07 0.1540 8 0.2 0.35 2.2
1.074 Total Volume Bekisting (m3)

m3) 3.671 Volume Bekisting Tie Beam (m2)

KOLOM

N 2. BEKISTING

K1
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.026 1.474 Lantai 1 0.13 0.2 3.78
0.026 0.495 Lantai 2 0.13 0.2 3.805
1.969 Total Volume Bekisting (m2)
K2A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0325 2.211 Lantai 1 0.13 0.25 3.78
0.0325 2.102 Lantai 2 0.13 0.25 3.805
4.314 Total Volume Bekisting (m2)
K2B
Dimensi (m)
Luas (m2) Volume (m3) No
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0325 0.369 Lantai 1 0.13 0.25 3.78
0.0325 0.247 Lantai 2 0.13 0.25 3.805
0.616 Total Volume Bekisting (m2)
K3
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.039 0.590 Lantai 1 0.13 0.3 3.78
0.039 0.594 Lantai 2 0.13 0.3 3.805
1.183 Total Volume Bekisting (m2)
K4A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0455 0.516 Lantai 1 0.13 0.35 3.78
0.0455 0.519 Lantai 2 0.13 0.35 3.805
1.035 Total Volume Bekisting (m2)
K4B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0455 0.344 Lantai 1 0.13 0.35 3.78
0.0455 0.346 Lantai 2 0.13 0.35 3.805
0.690 Total Volume Bekisting (m2)
TIS KOLOM PRAKTIS
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0169 1.214 Lantai 1 0.13 0.13 3.78
0.0169 0.643 Lantai 2 0.13 0.13 3.805
1.857 Total Volume Bekisting (m2)

3) 11.664 Volume Bekisting Kolom (m2)

BALOK

N 2. BEKISTING

TIPE B1
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.026 0.0803 1 0.13 0.2 3.09
0.026 0.0803 2 0.13 0.2 3.09
0.026 0.3884 3 0.13 0.2 14.94
0.549 Total Volume Bekisting (m2)
TIPE B2A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0325 0.1281 1 0.13 0.25 3.94
0.0325 0.2285 2 0.13 0.25 7.03
0.0325 0.3965 3 0.13 0.25 12.2
0.0325 0.0553 4 0.13 0.25 1.7
0.0325 0.3250 5 0.13 0.25 10
1.133 Total Volume Bekisting (m2)
TIPE B2B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0325 0.3019 1 0.13 0.25 9.29
0.0325 0.0975 2 0.13 0.25 3
0.0325 0.1300 3 0.13 0.25 4
0.0325 0.0517 4 0.13 0.25 1.59
0.581 Total Volume Bekisting (m2)
TIPE B3A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.039 0.1326 1 0.13 0.3 3.4
0.039 0.117 2 0.13 0.3 3
0.039 0.21606 3 0.13 0.3 5.54
0.039 0.156 4 0.13 0.3 4
0.039 0.0975 5 0.13 0.3 2.5
0.039 0.25506 6 0.13 0.3 6.54
0.974 Total Volume Bekisting (m2)
TIPE B3B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.039 0.117 1 0.13 0.3 3
0.039 0.20826 2 0.13 0.3 5.34
0.039 0.2262 3 0.13 0.3 5.8
0.551 Total Volume Bekisting (m2)
TIPE B4A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0455 0.48594 1 0.13 0.35 10.68
0.0455 0.182 2 0.13 0.35 4
0.668 Total Volume Bekisting (m2)
TIPE B4B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0455 0.1365 1 0.13 0.35 3
0.0455 0.314405 2 0.13 0.35 6.91
0.0455 0.23842 3 0.13 0.35 5.24
0.0455 0.3185 4 0.13 0.35 7
1.008 Total Volume Bekisting (m2)
TIPE B5B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.07 0.3731 1 0.2 0.35 5.33
0.07 0.9709 2 0.2 0.35 13.87
0.07 0.406 3 0.2 0.35 5.8
1.750 Total Volume Bekisting (m2)
TIPE 6A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.08 0.6832 1 0.2 0.4 8.54
0.683 Total Volume Bekisting (m2)
TIPE 6B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.08 0.4264 1 0.2 0.4 5.33
0.08 0.4264 2 0.2 0.4 5.33
0.853 Total Volume Bekisting (m2)
TIPE BC 1
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.024 0.0816 1 0.12 0.2 3.4
0.024 0.237192 2 0.12 0.2 9.883
0.319 Total Volume Bekisting (m2)
TIPE BC 2
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.03 0.09 1 0.12 0.25 3
0.090 Total Volume Bekisting (m2)

) 9.160 Volume Bekisting Balok (m2)

PELAT LANTAI

2. BEKISTING
Dimensi (m)
Volume (m3) Nama
Panjang Lebar Tinggi
1.588 4.2 3.15 0.12
R. Pembantu
0.756 2 3.15 0.12
0.059 Kanopi Jend 1.17 0.5 0.1
0.756 3.15 2 0.12
Teras Belak
0.713 6.6 0.9 0.12
0.115 Kanopi Jend 0.5 2.3 0.1
5.986 Bagian 1 8.6 5.8 0.12
3.758 Bagian 2 5.4 6.8 0.12
0.396 Bagian 3 (B 2.2 1.5 0.12
3.226 Bagian 4 6.4 4 0.12
1.426 Bagian 5 5.4 2.2 0.12
0.374 3 1.22 0.12
Bagian 6
0.428 3.33 0.5 0.12
1.757 3.5 4.184 0.12
Bagian 7 (d
0.273 4.549 0.5 0.12
0.114 Kanopi Dep 1.9 0.5 0.12
21.723 Total Volume Bekisting (m2)

RING BALOK

N 2. BEKISTING

TIPE RB 1
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.026 0.0572 1 0.13 0.2 2.2
m3) 0.0572 Total Volume Bekisting (m2)
TIPE RB 2
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0325 0.065 1 0.13 0.25 2
0.0325 0.072 2 0.13 0.25 2.2
0.0325 0.059 3 0.13 0.25 1.8
0.0325 0.130 4 0.13 0.25 4
0.0325 0.072 5 0.13 0.25 2.2
0.0325 0.072 6 0.13 0.25 2.2
0.0325 0.072 7 0.13 0.25 2.2
0.0325 0.111 8 0.13 0.25 3.4
0.0325 0.098 9 0.13 0.25 3
0.0325 0.073 10 0.13 0.25 2.25
0.0325 0.102 11 0.13 0.25 3.15
0.0325 0.051 12 0.13 0.25 1.575
0.0325 0.051 13 0.13 0.25 1.575
0.0325 0.051 14 0.13 0.25 1.575
0.0325 0.073 15 0.13 0.25 2.25
0.0325 0.124 16 0.13 0.25 3.825
0.0325 0.124 17 0.13 0.25 3.825
0.0325 0.124 18 0.13 0.25 3.825
0.0325 0.098 19 0.13 0.25 3
0.0325 0.325 20 0.13 0.25 10
m3) 1.945 Total Volume Bekisting (m2)
TIPE RB 3
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.039 0.2496 1 0.13 0.3 6.4
0.039 0.1326 2 0.13 0.3 3.4
0.039 0.195 3 0.13 0.3 5
0.039 0.195 4 0.13 0.3 5
0.039 0.195 5 0.13 0.3 5
0.039 0.0858 6 0.13 0.3 2.2
0.039 0.2106 7 0.13 0.3 5.4
0.039 0.351 8 0.13 0.3 9
0.039 0.234 9 0.13 0.3 6
m3) 1.849 Total Volume Bekisting (m2)
TIPE RB 4
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0455 0.2639 1 0.13 0.35 5.8
0.0455 0.273 2 0.13 0.35 6
0.0455 0.2912 3 0.13 0.35 6.4
m3) 0.828 Total Volume Bekisting (m2)

m3) 4.679 Volume Bekistig Ring Balok (m2)

PELAT ATAP

2. BEKISTING

Dimensi (m)
Volume (m3) AS Sisi Bekisting
Panjang Lebar Tinggi
Panjang : 1G-7G
2.200 10 2.2 0.1 1
Lebar : F1-G1
Panjang : A3-C3
1.188 5.4 2.2 0.1 1
Lebar : 3A-4A
Panjang : 4A-7A
0.914 5.8 1.575 0.1 1
Lebar : A4-B'4
0.345 1.15 3 0.1 1
Bagian Depan
0.415 4.15 1 0.1 1
0.095 Kanopi Jendela 1 1.9 0.5 0.1 1
0.095 Kanopi Jendela 2 1.9 0.5 0.1 1
0.095 Kanopi Jendela 3 1.9 0.5 0.1 1
5.347 Total Volume Bekisting Pelat Atap (m2)

TANGGA

1. BEKISTING

Detail Tangga
Anak Tangga = 4.800 m
Bordes T1 = 0.250 m
T2 = 0.100 m
L= 0.130 m
Plat Bordes = 3.300 m2
Balok Bordes = 3.552 m2
Total = 6.852 m2
Tebal Pelat = 0.100 m
Lebar Tangga = 1.000 m
Pelat = 14.095 m2
Total Vol. Bekisting 20.947 m2
PEKERJAAN BETON

TIE BEAM

2. BEKISTING 3. REKAPITULASI TULANG

TIPE TB 1
Nama As
Nama As Sisi Bekisting Luas (m2)
TB 1 4D-5D
4D-5D 2 0.72 4D'-5D'
4D'-5D' 2 0.72
Total (Kg)
me Bekisting (m2) 1.44
TIPE TB 2A
Nama As
Nama As Sisi Bekisting Luas (m2)
F1-G1
F1-G1 2 1.1000 C2-D1
TB 2A
C2-D1 2 1.5600 F3'-G3'
F3'-G3' 2 1.1000 F4-G4
F4-G4 2 1.1000 A5-B5
A5-B5 2 1.5750
Total (Kg)
me Bekisting (m2) 6.435
TIPE TB 2B
Nama As
Nama As Sisi Bekisting Luas (m2)
D1-F1
D1-F1 2 1.7000 C3-D3
C3-D3 2 1.5000 C4-D4
C4-D4 2 1.5000 B7-C7
TB 2B
B7-C7 2 1.1250 A7-B7
A7-B7 2 1.5750 GB-7B
GB-7B 2 1.5000 3A-4A
3A-4A 2 1.1000 4A-5A
4A-5A 2 0.9000 6A-7A
6A-7A 2 1.5000
Total (Kg)
me Bekisting (m2) 12.400
TIPE TB 3A
Nama As
Nama As Sisi Bekisting Luas (m2)
C5-D5
C5-D5 2 1.8000 TB 3A A2-C2
A2-C2 2 3.2400 2A-3A
2A-3A 2 0.9000 5G-7G
5G-7G 2 2.4000
Total (Kg)
Total (Kg)
me Bekisting (m2) 8.340
TIPE TB 4
Nama As
Nama As Sisi Bekisting Luas (m2)
TB 4 E7-G7
E7-G7 2 2.8000 C7-E7
C7-E7 2 3.2200
Total (Kg)
me Bekisting (m3) 6.020
TIPE TB 5A
Nama As
Nama As Sisi Bekisting Luas (m2)
1G-3'G
1G-3'G 2 1.0290 3'G-4G
3'G-4G 2 1.8900 4G-5G
4G-5G 2 1.2600 TB 5A 1F-3'F
1F-3'F 2 1.0290 3'F-4F
3'F-4F 2 1.8900 1'G-1G
1'G-1G 2 0.7000 1D-3D
1D-3D 2 1.4000 3D-4D
3D-4D 2 1.5400 Total (Kg)
me Bekisting (m3) 10.738

Volume Besi Beton Polos Untuk Tie Beam (Kg)


ting Tie Beam (m2) 45.373
Volume Besi Beton Ulir Untuk Tie Beam (Kg)

KOLOM

2. BEKISTING 3. REKAPITULASI TULANG

K1 Lantai 1
K1 Tul. Sengkang
Jumlah Sisi Bekisting Luas (m2)
118.62
15 4 18.711 Total (Kg) 351.11
5 4 12.557 35.111
Total (/10Kg)
me Bekisting (m2) 31.268 46.885
K2A
Lantai 1
Jumlah Sisi Bekisting Luas (m2)
K2A Tul. Sengkang
18 4 51.710 169.93
17 4 49.161 Total (Kg) 448.92
me Bekisting (m2) 100.871 44.892
Total (/10Kg)
K2B 87.546

Jumlah Sisi Bekisting Luas (m2)


Jumlah Sisi Bekisting Luas (m2)
Lantai 1
3 4 8.618 K2B Tul. Sengkang
2 4 5.784 28.32
me Bekisting (m2) 14.402 Total (Kg) 98.07
K3 9.807
Total (/10Kg)
16.384
Jumlah Sisi Bekisting Luas (m2)
4 4 13.003 Lantai 1
4 4 13.089 K3 Tul. Sengkang
me Bekisting (m2) 26.092 29.64
K4A Total (Kg) 122.64
12.264
Jumlah Sisi Bekisting Volume (m3) Total (/10Kg)
24.600
3 4 10.886
3 4 10.958 Lantai 1
me Bekisting (m2) 21.845 K4A Tul. Sengkang
K4B 25.33
Total (Kg) 107.63
Jumlah Sisi Bekisting Luas (m2)
10.763
Total (/10Kg)
2 4 7.258 21.588
2 4 7.306
me Bekisting (m2) 14.563 Lantai 1
KOLOM PRAKTIS K4B Tul. Sengkang
29.64
Jumlah Sisi Bekisting Luas (m2)
Total (Kg) 175.94
19 2 37.346 17.594
Total (/10Kg)
10 2 19.786 35.290
me Bekisting (m2) 57.132

isting Kolom (m2) 266.173

BALOK

2. BEKISTING 2.

TIPE B1 Nama As
As 9
Nama As Sisi Bekisting Luas (m2)
As 10
B1
As 9 3 1.6377 As G
As 10 3 1.6377
Total (Kg)
As G 3 7.9182
me Bekisting (m2) 11.194
TIPE B2A
Nama As
Nama As Sisi Bekisting Luas (m2)
As 9
As 9 3 2.4822 AS 10
AS 10 3 4.4289 As A
B2A
As A 3 7.686 AS D
AS D 3 1.071 As G
As G 3 6.3
Total (Kg)
me Bekisting (m2) 21.968
TIPE B2B
Nama As
Nama As Sisi Bekisting Luas (m2)
As 1
As 1 3 5.8527 As 3
As 3 3 1.8900 B2B As D
As D 3 2.5200 AS G
AS G 3 1.0017
Total (Kg)
me Bekisting (m2) 11.264
TIPE B3A
Nama As
Nama As Sisi Bekisting Luas (m2)
As 1
As 1 3 2.482 AS 2
AS 2 3 2.19 As 4
As 4 3 4.0442 B3A As A
As A 3 2.92 As C
As C 3 1.825 As D
As D 3 4.7742
Total (Kg)
me Bekisting (m2) 18.235
TIPE B3B
Nama As
Nama As Sisi Bekisting Luas (m2)
As 1
As 1 3 2.19 As 5
B3B
As 5 3 3.8982 As A
As A 3 4.234
Total (Kg)
me Bekisting (m2) 10.322
TIPE B4A
Nama As
Nama As Sisi Bekisting Luas (m2)
As 2
As 2 3 8.8644 B4A AS G
AS G 3 3.32
Total (Kg)
me Bekisting (m2) 12.184
TIPE B4B
Nama As
Nama As Sisi Bekisting Luas (m2)
As 4

B4B
As 4 3 2.49 As 7
As 7 3 5.7353 B4B As C
As C 3 4.3492 AS G
AS G 3 5.81
Total (Kg)
me Bekisting (m2) 18.385
TIPE B5B
Nama As
Nama As Sisi Bekisting Luas (m2)
As 3
As 3 3 4.797 B5B As 7
As 7 3 12.483 AS C
AS C 3 5.22 Total (Kg)
me Bekisting (m2) 22.500
TIPE 6A
Nama As
Nama As Sisi Bekisting Luas (m2)
B6A As 5
As 5 3 8.54 Total (Kg)
me Bekisting (m2) 8.540
TIPE 6B
Nama As
Nama As Sisi Bekisting Luas (m2)
As 3
B6B
As 3 3 5.33 As 4
As 4 3 5.33 Total (Kg)
me Bekisting (m2) 10.66
TIPE BC 1
Nama As
Nama As Sisi Bekisting Luas (m2)
As 1
As 1 3 1.768 BC1 As 7
As 7 3 5.13916
Total (Kg)
me Bekisting (m2) 6.90716
TIPE BC 2
Nama As
Nama As Sisi Bekisting Luas (m2)
As 7
BC2
As 7 3 1.86
Total (Kg)
me Bekisting (m2) 1.86

Volume Pembesian Polos Balok (Kg)


kisting Balok (m2) 154.020
Volume Pembesian Balok (per 10Kg)
Volume Pembesian Ulir Balok (Kg)
Volume Pembesian Balok (per 10Kg)
LAT LANTAI

EKISTING
Sisi Bekisting Luas (m2)
1 13.230
1 6.300
1 0.585
1 6.300
1 5.940
1 1.150
1 49.880
1 36.720
1 3.300
1 25.600
1 11.880
1 3.660
1 1.665
1 14.644
1 2.275
1 0.950
ting (m2) 184.079

NG BALOK

2. BEKISTING 3. PEMB

TIPE RB 1 Nama As
RB 1
Nama As Sisi Bekisting Luas (m2) 3B-4B
3B-4B 2 0.88
Total (Kg)
me Bekisting (m2) 0.88
TIPE RB 2
Nama As Sisi Bekisting Luas (m2)
Nama As
1G-3G 2 1.000 1G-3G
3G-4G 2 1.100 3G-4G
4G-5G 2 0.900 4G-5G
5G-7G 2 2.000 5G-7G
F7-G7 2 1.100 F7-G7
F5-G5 2 1.100 F5-G5
F2-G2 2 1.100 F2-G2
D1-F1 2 1.700 D1-F1
C1-D1 2 1.500 C1-D1
B3-C3 2 1.125 RB 2 B3-C3
RB 2
A3-B3 2 1.575 A3-B3
A4-B'4 2 0.788 A4-B'4
A6-B'6 2 0.788 A6-B'6
A7-B'7 2 0.788 A7-B'7
B3-C3 2 1.125 B3-C3
B'4-C4 2 1.913 B'4-C4
B'6-C6 2 1.913 B'6-C6
B'7-C7 2 1.913 B'7-C7
C5-D5 2 1.500 C5-D5
1F-7F 2 5.000 1F-7F
me Bekisting (m2) 29.925
Total (Kg)
TIPE RB 3
Nama As Sisi Bekisting Volume (m3)
Nama As
C7-F7 2 3.84 C7-F7
D5-F5 2 2.04 D5-F5
5E-7E 2 3 5E-7E
5D-7D 2 3 5D-7D
RB 3
5C-7C 2 3 5C-7C
3C-4C 2 1.32 3C-4C
A4-C4 2 3.24 A4-C4
3A-7A 2 5.4 3A-7A
1C-4C 2 3.6 1C-4C
me Bekisting (m2) 28.440
Total (Kg)
TIPE RB 4
Nama As Sisi Bekisting Volume (m3)
Nama As
4B'-7B' 2 4.06 4B'-7B'
RB 4
1C-5C 2 4.2 1C-5C
C3'-F3' 2 4.48 C3'-F3'
me Bekisting (m2) 12.740
Total (Kg)

tig Ring Balok (m2) 71.985


Volume Pembesian Ring Balok (Kg)
Volume Pembesian Ring Balok (Per 10 Kg)

ELAT ATAP

Luas (m2)
22

11.88

9.135
3.45
4.15
0.95
0.95
0.95
53.465

TANGGA
3. REKAPITULASI TULANGAN

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


1.8 3.953 7.721
1.8 3.953 0.000
7.906 7.721
otal (Kg)
15.627

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


2.2 5.528 9.505
3.12 7.514 12.788
2.2 5.528 9.505
2.2 5.528 9.505
3.15 7.579 12.895
31.677 54.198
otal (Kg)
85.875

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


3.4 8.119 18.400
3 7.255 16.616
3 7.255 16.616
2.25 5.636 13.271
3.15 7.579 17.285
3 7.255 16.616
2.2 5.528 13.048
1.8 4.664 11.264
3 7.255 16.616
60.548 139.734
otal (Kg)
200.281

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


3 8.361 20.798
5.4 14.334 33.643
1.5 4.629 12.770
4 10.850 26.150
38.174 93.360
otal (Kg)
otal (Kg)
131.534

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


4 12.285 33.925
4.6 13.976 37.939
26.261 71.863
otal (Kg)
98.124

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


1.47 5.759 12.628
2.7 9.629 19.024
1.8 6.797 14.344
1.47 5.759 12.628
2.7 9.629 19.024
1 4.280 10.184
2 7.427 15.384
2.2 8.056 16.424
otal (Kg) 57.335 119.637
176.973

olos Untuk Tie Beam (Kg) 588.777 58.878


lir Untuk Tie Beam (Kg) 119.637 11.964

3. REKAPITULASI TULANGAN

Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
232.49 39.80 77.94
351.11 117.74
35.111 11.774
46.885

Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
278.99 161.53 265.01
448.92 426.53
44.892 42.653
87.546
Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
69.75 19.00 46.77
98.07 65.77
9.807 6.577
16.384

Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
93.00 29.83 93.53
122.64 123.36
12.264 12.336
24.600 Volume Besi Beton Polos Untuk Kolom (K
Volume Besi Beton Ulir Untuk Kolom (Kg)
Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
82.29 25.50 82.76
107.63 108.26
10.763 10.826
21.588

Lantai 1 Lantai 2 Lantai 1


Tul. Pokok Tul. Sengkang Tul. Pokok KP Tul. Sengkang
146.30 29.83 147.13 38.90
175.94 176.96 Total (Kg) 237.40
17.594 17.696 23.740
Total (/10Kg)
35.290 36.

2. REKAPITULASI TULANGAN

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


3.09 4.285 12.324
3.09 4.285 12.324
14.94 18.374 54.605
26.945 79.252
Total (Kg)
106.197
Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok
3.94 6.322 15.357
7.03 10.708 26.382
12.2 18.046 44.828
1.7 3.143 7.364
10 14.924 36.979
53.143 130.910
Total (Kg)
184.053

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


9.29 13.916 64.065
3 4.988 24.790
4 6.407 29.928
1.59 2.987 15.986
28.298 134.770
Total (Kg)
163.069

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


3.4 5.556 27.823
3 4.988 25.326
5.54 8.593 41.185
4 6.407 31.570
2.5 4.278 22.204
6.54 10.013 47.429
39.836 195.537
Total (Kg)
235.373

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


3 5.798 17.062
5.34 9.658 27.499
5.8 10.417 29.550
25.873 74.111
Total (Kg)
99.984

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


10.68 21.047 73.815
4 8.488 26.132
29.535 99.947
Total (Kg)
129.482

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


3 6.608 17.508
6.91 13.959 34.947
5.24 10.819 27.499
7 14.128 35.348
45.514 115.302
Total (Kg)
160.816

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


5.33 12.874 32.700
13.87 31.685 77.066
5.8 13.909 35.102
Total (Kg) 58.468 144.868
203.336

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


8.54 22.031 99.823
Total (Kg) 22.031 99.823
121.854

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


5.33 14.220 37.56376
5.33 14.220 37.56376
Total (Kg) 28.441 75.128
103.568

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


3.4 4.474 9.215
9.883 11.883 25.189
16.356 34.405
Total (Kg)
50.761

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


3 4.826 15.104
4.826 15.104
Total (Kg)
19.930

los Balok (Kg) 1258.605


alok (per 10Kg) 125.860
ir Balok (Kg) 319.819
alok (per 10Kg) 31.982
3. PEMBESIAN

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


2.2 4.517 9.148
4.517 9.148
otal (Kg)
13.665

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


2 4.785 8.435
2.2 5.191 9.148
1.8 4.380 7.721
4 8.841 15.571
2.2 5.191 9.148
2.2 5.191 9.148
2.2 5.191 9.148
3.4 7.624 13.430
3 6.813 12.003
2.25 5.292 9.327
3.15 7.117 12.538
1.575 3.924 6.918
1.575 3.924 6.918
1.575 3.924 6.918
2.25 5.292 9.327
3.825 8.486 14.946
3.825 8.486 14.946
3.825 8.486 14.946
3 6.813 12.003
10 21.007 36.979
135.955 239.520
otal (Kg)
375.475

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


6.4 15.932 32.226
3.4 8.862 18.846
5 12.633 25.982
5 12.633 25.982
5 12.633 25.982
2.2 6.033 13.494
5.4 13.575 27.766
9 22.060 43.822
6 14.989 30.442
119.350 244.544
otal (Kg)
363.894

Bentang (m) Vol. Tul. Sengkang Vol. Tul. Pokok


5.8 16.546 30.642
6 17.083 31.534
6.4 18.157 33.318
51.786 95.494
otal (Kg)
147.280

ng Balok (Kg) 900.314


ng Balok (Per 10 Kg) 90.031
Polos Untuk Kolom (Kg) 222.754
Ulir Untuk Kolom (Kg) 45.848

Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
198.50 20.60 105.09
237.40 125.69
23.740 12.569
36.309
NO URUTAN PEKERJAAN
1 2
D
D.1 Pekerjaan Tie Beam
D.1.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.1.2 Pembesian 10 Kg dengan besi ulir
D.1.3 Pembesian 10 Kg dengan besi polos
D.1.4 Pemasangan 1 m2 Bekisting untuk tie beam
D.2 Pekerjaan Kolom
D.2.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.2.2 Pembesian 10 Kg dengan besi ulir
D.2.3 Pembesian 10 Kg dengan besi polos
D.2.4 Pemasangan 1 m2 Bekisting untuk kolom
D.3 Pekerjaan Balok
D.3.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.3.2 Pembesian 10 Kg dengan besi ulir
D.3.3 Pembesian 10 Kg dengan besi polos
D.3.4 Pemasangan 1 m2 Bekisting untuk balok
D.4 Pekerjaan Pelat Lantai
D.4.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.4.2 Pembesian 10 Kg dengan besi polos
D.3.4 Pemasangan 1 m2 Bekisting untuk pelat lantai
D.5 Pekerjaan Ring Balok
D.5.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.5.2 Pembesian 10 Kg dengan besi polos
D.5.3 Pemasangan 1 m2 Bekisting untuk ring balok
D.6 Pekerjaan Pelat Atap
D.6.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.6.2 Pembesian 10 Kg dengan besi polos
D.6.3 Pemasangan 1 m2 Bekisting untuk pelat atap
D.7.1 Pekerjaan Tangga
D.7.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.7.2 Pembesian 10 Kg dengan besi polos
D.7.3 Pemasangan 1 m2 Bekisting untuk tangga
TOTAL
No Tenaga Kerja
1 2
1 Pekerja
2 Tukang Batu
3 Tukang Kayu
4 Kepala Tukang Batu
5 Kepala Tukang Kayu
6 Mandor
TOTAL

No Bahan
1 2
1 Semen Portland
2 Pasir Beton
3 Kerikil
4 Air
5 Besi Beton Ulir
6 Kawat Beton
7 Besi Beton Polos
8 Kayu Kelas III (Papan Albasia)
9 Paku 5-10 cm
10 Minyak Bekisting
11 Paku 8-12 cm
12 Balok Kayu Kelas II (Balok Albasia)
13 Triplek 9 mm 120 x 240
14 Dolken Kayu Ø 8-10 cm panj. 4m
TOTAL
RENCANA ANGGARAN BIAYA PEKER

HARGA SATUAN JUMLAH HARGA


VOL SAT
UPAH BAHAN UPAH
3 4 5 6 7 = (3x5)
PEKERJAAN BETON

3.671 m3 Rp 202,030.50 Rp 680,295.00 Rp 741,739.83


11.964 Kg Rp 15,707.00 Rp 123,712.50 Rp 187,914.53
58.878 Kg Rp 15,707.00 Rp 103,500.00 Rp 924,792.07
45.373 m2 Rp 84,656.000 Rp 87,825.000 Rp 3,841,096.69

11.664 m3 Rp 202,030.50 Rp 680,295.00 Rp 2,356,471.23


45.848 Kg Rp 15,707.00 Rp 123,712.50 Rp 720,140.82
222.754 Kg Rp 15,707.00 Rp 103,500.00 Rp 3,498,790.80
266.173 m2 Rp 107,448.000 Rp 193,175.000 Rp 28,599,788.74

9.160 m3 Rp 202,030.50 Rp 680,295.00 Rp 1,850,545.24


31.982 Kg Rp 15,707.00 Rp 123,712.50 Rp 502,339.26
125.860 Kg Rp 15,707.00 Rp 103,500.00 Rp 1,976,890.63
154.020 m2 Rp 107,448.000 Rp 193,175.000 Rp 16,549,115.17

21.723 m3 Rp 202,030.50 Rp 680,295.00 Rp 4,388,739.62


157.196 Kg Rp 15,707.00 Rp 103,500.00 Rp 2,469,070.09
184.079 m2 Rp 107,448.000 Rp 296,325.000 Rp 19,778,866.67

4.679 m3 Rp 202,030.50 Rp 680,295.00 Rp 945,305.76


90.031 Kg Rp 15,707.00 Rp 103,500.00 Rp 1,414,122.56
71.985 m2 Rp 84,656.000 Rp 81,900.000 Rp 6,093,962.16

5.347 m3 Rp 202,030.50 Rp 680,295.00 Rp 1,080,156.07


58.801 Kg Rp 15,707.00 Rp 103,500.00 Rp 923,589.95
53.465 m2 Rp 84,656.000 Rp 196,325.000 Rp 4,526,133.04

3.294 m3 Rp 202,030.50 Rp 680,295.00 Rp 665,393.51


37.549 Kg Rp 15,707.00 Rp 103,500.00 Rp 589,778.04
20.947 m2 Rp 84,656.000 Rp 177,350.000 Rp 1,773,323.09
Rp 106,398,065.55
TOTAL
Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah
3 4 5 6 = (4 x 5)
Oh 655.64 Rp 95,600.00 Rp 62,678,875.24
Oh 75.23 Rp 109,300.00 Rp 8,222,982.20
Oh 249.27 Rp 109,300.00 Rp 27,245,202.12
Oh 7.55 Rp 120,000.00 Rp 906,369.92
Oh 24.93 Rp 120,000.00 Rp 2,991,239.03
Oh 33.23 Rp 131,000.00 Rp 4,353,397.04
TOTAL Rp 106,398,065.55

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Bahan


3 4 5 6 = (4 x 5)
Kg 22088.34 Rp 1,100.00 Rp 24,297,173.66
Kg 41557.04 Rp 179.00 Rp 7,438,709.81
Kg 62335.56 Rp 139.00 Rp 8,664,642.43
Liter 12800.52 Rp 8.00 Rp 102,404.16
Kg 942.84 Rp 11,425.00 Rp 10,771,914.64
Kg 126.13 Rp 25,000.00 Rp 3,153,234.72
Kg 7886.22 Rp 9,500.00 Rp 74,919,090.53
m3 31.86 Rp 1,815,000.00 Rp 57,824,210.96
Kg 192.01 Rp 15,000.00 Rp 2,880,122.82
Liter 111.60 Rp 16,500.00 Rp 1,841,472.86
Kg 79.85 Rp 15,000.00 Rp 1,197,779.85
m3 10.18 Rp 1,705,000.00 Rp 17,357,342.28
Lembar 237.54 Rp 111,000.00 Rp 26,366,871.85
Batang 2093.68 Rp 25,000.00 Rp 52,342,048.00
TOTAL Rp 289,157,018.57
GARAN BIAYA PEKERJAAN BETON

JUMLAH HARGA TOTAL HARGA


BAHAN (UPAH+BAHAN)
8 = (3x6) 9 = (7+8)

Rp 2,497,652.07 Rp 3,239,391.90
Rp 1,480,064.68 Rp 1,667,979.21
Rp 6,093,842.21 Rp 7,018,634.29
Rp 3,984,883.73 Rp 7,825,980.41

Rp 7,934,918.70 Rp 10,291,389.93
Rp 5,672,020.19 Rp 6,392,161.00
Rp 23,054,997.62 Rp 26,553,788.41
Rp 51,418,027.23 Rp 80,017,815.97

Rp 6,231,319.88 Rp 8,081,865.12
Rp 3,956,557.34 Rp 4,458,896.60
Rp 13,026,560.14 Rp 15,003,450.77
Rp 29,752,767.14 Rp 46,301,882.31

Rp 14,778,152.89 Rp 19,166,892.50
Rp 16,269,736.67 Rp 18,738,806.76
Rp 54,547,061.51 Rp 74,325,928.18

Rp 3,183,117.31 Rp 4,128,423.07
Rp 9,318,245.67 Rp 10,732,368.23
Rp 5,895,571.50 Rp 11,989,533.66

Rp 3,637,197.22 Rp 4,717,353.29
Rp 6,085,920.90 Rp 7,009,510.84
Rp 10,496,516.13 Rp 15,022,649.17

Rp 2,240,571.99 Rp 2,905,965.50
Rp 3,886,294.48 Rp 4,476,072.52
Rp 3,715,021.39 Rp 5,488,344.48
Rp 289,157,018.57 Rp 395,555,084.13
TIE BEAM (TB1 15x20)

Sengkang TB 1 Gambar Bentang (m) Ø

Tumpuan 1.8 Ø8-10

Lapangan 1.8 Ø8-15

Tu. Pokok TB 1 Gambar Bentang (m) Ø

Tul. Bawah 1.8 12

Tul. Atas 1.8 12

TIEBEAM (TB2A 15x25

Sengkang TB 2A Gambar Bentang (m) Ø

Tumpuan 2.2 Ø8-10


Lapangan 2.2 Ø8-15

Tumpuan 3.12 Ø8-10

Lapangan 3.12 Ø8-15

Tumpuan 3.15 Ø8-10

Lapangan 3.15 Ø8-15

Tul. Pokok TB 2A Gambar Bentang (m) Ø

Tul. Bawah 2.2 12

Tul. Atas 2.2 12


Tul. Atas 2.2 12

Tul. Bawah 3.12 12

Tul. Atas 3.12 12

Tul. Bawah 3.15 12

Tul. Atas 3.15 12

TIEBEAM (TB2B 15x250

Sengkang TB 2B Gambar Bentang (m) Ø

Tumpuan 3.4 Ø8-10

Lapangan 3.4 Ø8-15

Tumpuan 3 Ø8-10
Tumpuan 3 Ø8-10

Lapangan 3 Ø8-15

Tumpuan 2.25 Ø8-10

Lapangan 2.25 Ø8-15

Tumpuan 3.15 Ø8-10

Lapangan 3.15 Ø8-15

Tumpuan 2.2 Ø8-10

Lapangan 2.2 Ø8-15


Lapangan 2.2 Ø8-15

Tumpuan 1.8 Ø8-10

Lapangan 1.8 Ø8-15

Tul. Pokok TB 2B Gambar Bentang (m) Ø

Tul. Tumpuan 3.4 12

Tul. Lapangan 3.4 12

Tul. Pokok Atas 3.4 12

Tul. Pokok Bawah 3.4 12

Tul. Tumpuan 3 12

Tul. Lapangan 3 12
Tul. Lapangan 3 12

Tul. Pokok Atas 3 12

Tul. Pokok Bawah 3 12

Tul. Tumpuan 2.25 12

Tul. Lapangan 2.25 12

Tul. Pokok Atas 2.25 12

Tul. Pokok Bawah 2.25 12

Tul. Tumpuan 3.15 12

Tul. Lapangan 3.15 12

Tul. Pokok Atas 3.15 12

Tul. Pokok Bawah 3.15 12

Tul. Tumpuan 2.2 12


Tul. Tumpuan 2.2 12

Tul. Lapangan 2.2 12

Tul. Pokok Atas 2.2 12

Tul. Pokok Bawah 2.2 12

Tul. Tumpuan 1.8 12

Tul. Lapangan 1.8 12

Tul. Pokok Atas 1.8 12

Tul. Pokok Bawah 1.8 12

TIEBEAM (TB3A 15X30

Sengkang TB 3A Gambar Bentang (m) Ø

Tumpuan 3 Ø8-10
Lapangan 3 Ø8-15

Tumpuan 5.4 Ø8-10

Lapangan 5.4 Ø8-15

Tumpuan 1.5 Ø8-10

Lapangan 1.5 Ø8-15

Tumpuan 4 Ø8-10

Lapangan 4 Ø8-15
Lapangan 4 Ø8-15

Tul. Pokok TB 3A Gambar Bentang (m) Ø

Tul. Tumpuan 3 12

Tul. Pokok Atas 3 12

Tul. Pokok Bawah 3 12

Tul. Tumpuan 5.4 12

Tul. Pokok Atas 5.4 12

Tul. Pokok Bawah 5.4 12

Tul. Tumpuan 1.5 12

Tul. Pokok Atas 1.5 12

Tul. Pokok Bawah 1.5 12


Tul. Tumpuan 4 12

Tul. Pokok Atas 4 12

Tul. Pokok Bawah 4 12

TIEBEAM (TB4 15X35)

Sengkang TB 4 Gambar Bentang (m) Ø

Tumpuan 4 Ø8-10

Lapangan 4 Ø8-15

Tumpuan 4.6 Ø8-10

Lapangan 4.6 Ø8-15


Lapangan 4.6 Ø8-15

Tul. Pokok TB 4 Gambar Bentang (m) Ø

Tul. Tumpuan 4 12

Tul. Tumpuan 4 12

Tul Lapangan 4 12

Tul. Pokok Atas 4 12

Tul. Pokok Bawah 4 12

Tul. Tumpuan 4.6 12

Tul. Tumpuan 4.6 12

Tul Lapangan 4.6 12

Tul. Pokok Atas 4.6 12

Tul. Pokok Bawah 4.6 12


Tul. Pokok Bawah 4.6 12

TIEBEAM (TB5A 20X35

Sengkang TB 5 Gambar Bentang (m) Ø

Tumpuan 1.47 Ø8-10

Lapangan 1.47 Ø8-15

Tumpuan 2.7 Ø8-10

Lapangan 2.7 Ø8-15

Tumpuan 1.8 Ø8-10

Lapangan 1.8 Ø8-15


Lapangan 1.8 Ø8-15

Tumpuan 1 Ø8-10

Lapangan 1 Ø8-15

Tumpuan 2 Ø8-10

Lapangan 2 Ø8-15

Tumpuan 2.2 Ø8-10

Lapangan 2.2 Ø8-15


Lapangan 2.2 Ø8-15

Tul. Pokok TB 5A Gambar Bentang (m) D

Tul. Tumpuan 1.47 13

Tul. Lapangan 1.47 13

Tul. Pokok Atas 1.47 13

Tul. Pokok Bawah 1.47 13

Tul. Tumpuan 2.7 13

Tul. Lapangan 2.7 13

Tul. Pokok Atas 2.7 13

Tul. Pokok Bawah 2.7 13

Tul. Tumpuan 1.8 13

Tul. Lapangan 1.8 13


Tul. Lapangan 1.8 13

Tul. Pokok Atas 1.8 13

Tul. Pokok Bawah 1.8 13

Tul. Tumpuan 1 13

Tul. Lapangan 1 13

Tul. Pokok Atas 1 13

Tul. Pokok Bawah 1 13

Tul. Tumpuan 2 13

Tul. Lapangan 2 13

Tul. Pokok Atas 2 13

Tul. Pokok Bawah 2 13

Tul. Tumpuan 2.2 13


Tul. Tumpuan 2.2 13

Tul. Lapangan 2.2 13

Tul. Pokok Atas 2.2 13

Tul. Pokok Bawah 2.2 13


TIE BEAM (TB1 15x20)

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

0.09 0.14 0.048 0.556 5.5 0.395 2.416

0.09 0.14 0.048 0.556 7 0.395 1.537

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

1.74 0.14 0.072 2.164 2 0.892 3.861

1.74 0.14 0.072 2.164 2 0.892 3.861

TIEBEAM (TB2A 15x25)

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

0.09 0.19 0.048 0.656 6.5 0.395 3.369


0.09 0.19 0.048 0.656 8.3 0.395 2.159

0.09 0.19 0.048 0.656 8.8 0.395 4.561

0.09 0.19 0.048 0.656 11.4 0.395 2.954

0.09 0.19 0.048 0.656 8.9 0.395 4.599

0.09 0.19 0.048 0.656 11.5 0.395 2.980

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

2.14 0.19 0.072 2.664 2 0.892 4.753

2.14 0.19 0.072 2.664 2 0.892 4.753


2.14 0.19 0.072 2.664 2 0.892 4.753

3.06 0.19 0.072 3.584 2 0.892 6.394

3.06 0.19 0.072 3.584 2 0.892 6.394

3.09 0.19 0.072 3.614 2 0.892 6.447

3.09 0.19 0.072 3.614 2 0.892 6.447

TIEBEAM (TB2B 15x250)

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

0.09 0.19 0.048 0.656 9.5 0.395 4.923

0.09 0.19 0.048 0.656 12.3 0.395 3.196

0.09 0.19 0.048 0.656 8.5 0.395 4.405


0.09 0.19 0.048 0.656 8.5 0.395 4.405

0.09 0.19 0.048 0.656 11.0 0.395 2.850

0.09 0.19 0.048 0.656 6.6 0.395 3.433

0.09 0.19 0.048 0.656 8.5 0.395 2.203

0.09 0.19 0.048 0.656 8.9 0.395 4.599

0.09 0.19 0.048 0.656 11.5 0.395 2.980

0.09 0.19 0.048 0.656 6.5 0.395 3.369

0.09 0.19 0.048 0.656 8.3 0.395 2.159


0.09 0.19 0.048 0.656 8.3 0.395 2.159

0.09 0.19 0.048 0.656 5.5 0.395 2.850

0.09 0.19 0.048 0.656 7.0 0.395 1.814

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

1.09 0.19 0.072 1.424 2 0.892 2.540

2.18 0.072 - 2.324 1 0.892 2.073

3.34 0.19 0.072 3.864 2 0.892 6.893

3.34 0.19 0.072 3.864 2 0.892 6.893

0.99 0.19 0.072 1.324 2 0.892 2.362

1.98 0.072 - 2.124 1 0.892 1.895


1.98 0.072 - 2.124 1 0.892 1.895

2.94 0.19 0.072 3.464 2 0.892 6.180

2.94 0.19 0.072 3.464 2 0.892 6.180

0.8025 0.19 0.072 1.1365 2 0.892 2.028

1.605 0.072 - 1.749 1 0.892 1.560

2.19 0.19 0.072 2.714 2 0.892 4.842

2.19 0.19 0.072 2.714 2 0.892 4.842

1.0275 0.19 0.072 1.3615 2 0.892 2.429

2.055 0.072 - 2.199 1 0.892 1.962

3.09 0.19 0.072 3.614 2 0.892 6.447

3.09 0.19 0.072 3.614 2 0.892 6.447

0.79 0.19 0.072 1.124 2 0.892 2.005


0.79 0.19 0.072 1.124 2 0.892 2.005

1.58 0.072 - 1.724 1 0.892 1.538

2.14 0.19 0.072 2.664 2 0.892 4.753

2.14 0.19 0.072 2.664 2 0.892 4.753

0.69 0.19 0.072 1.024 2 0.892 1.827

1.38 0.072 - 1.524 1 0.892 1.359

1.74 0.19 0.072 2.264 2 0.892 4.039

1.74 0.19 0.072 2.264 2 0.892 4.039

TIEBEAM (TB3A 15X30)

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

0.09 0.24 0.048 0.756 8.5 0.395 5.077


0.09 0.24 0.048 0.756 11.0 0.395 3.285

0.09 0.24 0.048 0.756 14.5 0.395 8.660

0.09 0.24 0.048 0.756 19.0 0.395 5.674

0.09 0.24 0.048 0.756 4.8 0.395 2.837

0.09 0.24 0.048 0.756 6.0 0.395 1.792

0.09 0.24 0.048 0.756 11.0 0.395 6.570

0.09 0.24 0.048 0.756 14.3 0.395 4.280


0.09 0.24 0.048 0.756 14.3 0.395 4.280

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

0.99 0.24 0.072 1.374 4 0.892 4.902

2.94 0.24 0.072 3.564 2 0.892 6.358

2.94 0.24 0.072 3.564 3 0.892 9.537

1.59 0.24 0.072 1.974 4 0.892 7.043

5.34 0.24 0.072 5.964 2 0.892 10.640

5.34 0.24 0.072 5.964 3 0.892 15.960

0.615 0.24 0.072 0.999 4 0.892 3.564

1.44 0.24 0.072 2.064 2 0.892 3.682

1.44 0.24 0.072 2.064 3 0.892 5.523


1.24 0.24 0.072 1.624 4 0.892 5.794

3.94 0.24 0.072 4.564 2 0.892 8.142

3.94 0.24 0.072 4.564 3 0.892 12.213

TIEBEAM (TB4 15X35)

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

0.09 0.29 0.048 0.856 11.0 0.395 7.439

0.09 0.29 0.048 0.856 14.3 0.395 4.846

0.09 0.29 0.048 0.856 12.5 0.395 8.453

0.09 0.29 0.048 0.856 16.3 0.395 5.523


0.09 0.29 0.048 0.856 16.3 0.395 5.523

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

1.24 0.29 0.072 1.674 4 0.892 5.973

1.24 0.072 - 1.384 2 0.892 2.469

2.48 0.072 - 2.624 2 0.892 4.681

3.94 0.29 0.072 4.664 3 0.892 12.481

3.94 0.29 0.072 4.664 2 0.892 8.321

1.39 0.29 0.072 1.824 4 0.892 6.508

1.39 0.072 - 1.534 2 0.892 2.737

2.78 0.072 - 2.924 2 0.892 5.216

4.54 0.29 0.072 5.264 3 0.892 14.086

4.54 0.29 0.072 5.264 2 0.892 9.391


4.54 0.29 0.072 5.264 2 0.892 9.391

TIEBEAM (TB5A 20X35)

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

0.14 0.29 0.048 0.956 4.7 0.395 3.531

0.14 0.29 0.048 0.956 5.9 0.395 2.228

0.14 0.29 0.048 0.956 7.8 0.395 5.853

0.14 0.29 0.048 0.956 10.0 0.395 3.776

0.14 0.29 0.048 0.956 5.5 0.395 4.154

0.14 0.29 0.048 0.956 7.0 0.395 2.643


0.14 0.29 0.048 0.956 7.0 0.395 2.643

0.14 0.29 0.048 0.956 3.5 0.395 2.643

0.14 0.29 0.048 0.956 4.3 0.395 1.636

0.14 0.29 0.048 0.956 6.0 0.395 4.531

0.14 0.29 0.048 0.956 7.7 0.395 2.895

0.14 0.29 0.048 0.956 6.5 0.395 4.909

0.14 0.29 0.048 0.956 8.3 0.395 3.147


0.14 0.29 0.048 0.956 8.3 0.395 3.147

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c

0.6275 0.29 0.078 1.0735 2 1.04 2.233

1.255 0.078 - 1.411 1 1.04 1.467

1.41 0.29 0.078 2.146 2 1.04 4.464

1.41 0.29 0.078 2.146 2 1.04 4.464

0.935 0.29 0.078 1.381 2 1.04 2.872

1.87 0.078 - 2.026 1 1.04 2.107

2.64 0.29 0.078 3.376 2 1.04 7.022

2.64 0.29 0.078 3.376 2 1.04 7.022

0.71 0.29 0.078 1.156 2 1.04 2.404

1.42 0.078 - 1.576 1 1.04 1.639


1.42 0.078 - 1.576 1 1.04 1.639

1.74 0.29 0.078 2.476 2 1.04 5.150

1.74 0.29 0.078 2.476 2 1.04 5.150

0.51 0.29 0.078 0.956 2 1.04 1.988

1.02 0.078 - 1.176 1 1.04 1.223

0.94 0.29 0.078 1.676 2 1.04 3.486

0.94 0.29 0.078 1.676 2 1.04 3.486

0.76 0.29 0.078 1.206 2 1.04 2.508

1.52 0.078 - 1.676 1 1.04 1.743

1.94 0.29 0.078 2.676 2 1.04 5.566

1.94 0.29 0.078 2.676 2 1.04 5.566

0.81 0.29 0.078 1.256 2 1.04 2.612


0.81 0.29 0.078 1.256 2 1.04 2.612

1.62 0.078 - 1.776 1 1.04 1.847

2.14 0.29 0.078 2.876 2 1.04 5.982

2.14 0.29 0.078 2.876 2 1.04 5.982


Dimensi (m)
Tipe Kolom Gambar Bentang (m)
a b
Sengkang Ø8 -100

3.78 0.07 0.14

Tul Pokok Ø12


Lantai 1

3.78 3.72 0.24

K1 (13X20)
Sengkang Ø8 -100

3.805 0.07 0.14

Tul Pokok Ø12


Lantai 2

3.805 3.745 0.24


Sengkang Ø8 -100

3.78 0.07 0.19

Tul Pokok Ø12


Lantai 1

3.78 3.72 0.24

K2A (13X25)
Sengkang Ø8 -100

3.805 0.07 0.19

Tul Pokok Ø12


Lantai 2

3.805 3.745 0.24

Sengkang Ø8 -100

3.78 0.07 0.19

Lantai 1
3.78 0.07 0.19

Tul Pokok Ø12


Lantai 1

3.78 3.72 0.24

K2B (13X25)
Sengkang Ø8 -100

3.805 0.07 0.19

Tul Pokok Ø12


Lantai 2

3.805 3.745 0.24

Sengkang Ø8 -150

3.78 0.07 0.24

Tul Pokok Ø12


Lantai 1

3.78 3.72 0.24


3.78 3.72 0.24

K3 (13X30)
Sengkang Ø8 -150

3.805 0.07 0.24

Tul Pokok Ø12


Lantai 2

3.805 3.745 0.24

Sengkang Ø8 -150

3.78 0.07 0.29

Tul Pokok D13


Lantai 1

3.78 3.72 0.26

K4A (13X35)
Sengkang Ø8 -150

3.805 0.07 0.29


K4A (13X35)

3.805 0.07 0.29

Tul Pokok D13


Lantai 2

3.805 3.745 0.26

Sengkang Ø8 -150

3.78 0.07 0.24

Tul Pokok D13


Lantai 1

3.78 3.72 0.26

K4B (13X35)
Sengkang Ø8 -150

3.805 0.07 0.24

Tul Pokok D13


Lantai 2
Lantai 2

3.805 3.745 0.26

Sengkang Ø6 -150

3.78 0.07 0.07

Tul Pokok Ø10


Lantai 1

3.78 3.72 0.2

KP (13X13)
Sengkang Ø6 -150

3.805 0.07 0.07

Tul Pokok Ø10


Lantai 2

3.805 3.745 0.2


3.805 3.745 0.2
KOLOM

Dimensi (m)
Panjang Tul (m) Jumlah (bh) Berat Tul (Kg/m) Volume (Kg)
c

0.048 0.516 38.8 0.395 7.908

0.072 4.344 4 0.892 15.499

0.048 0.516 39.05 0.395 7.959

0.072 4.369 4 0.892 15.589


0.048 0.616 38.8 0.395 9.441

0.072 4.344 4 0.892 15.499

0.048 0.616 39.05 0.395 9.502

0.072 4.369 4 0.892 15.589

0.048 0.616 38.8 0.395 9.441


0.048 0.616 38.8 0.395 9.441

0.072 4.344 6 0.892 23.249

0.048 0.616 39.05 0.395 9.502

0.072 4.369 6 0.892 23.383

0.048 0.716 26.2 0.395 7.410

0.072 4.344 6 0.892 23.249


0.072 4.344 6 0.892 23.249

0.048 0.716 26.37 0.395 7.457

0.072 4.369 6 0.892 23.383

0.048 0.816 26.2 0.395 8.445

0.078 4.396 6 1.04 27.431

0.048 0.816 26.37 0.395 8.499


0.048 0.816 26.37 0.395 8.499

0.078 4.421 6 1.04 27.587

0.048 0.716 26.2 0.395 7.410

0.078 4.396 8 1.04 36.575

0.048 0.716 26.37 0.395 7.457


0.078 4.421 8 1.04 36.783

0.036 0.352 26.2 0.222 2.047

0.06 4.24 4 0.616 10.447

0.036 0.352 26.37 0.222 2.060

0.06 4.265 4 0.616 10.509


0.06 4.265 4 0.616 10.509
Jumlah Kolom Vol. Total (Kg) Jenis Ruangan

15 118.62

15 232.491

Ruang Pembantu

5 39.80

5 77.943
18 169.93
Kanopi Jendela

18 278.989

17 161.53

Teras Belakang

17 265.006

3 28.32
3 28.32

3 69.747

Kanopi Jendela

2 19.00

2 46.766

Bagian 1

4 29.64

4 92.996 Bagian 2
4 92.996 Bagian 2

4 29.83

Bagian 3 (Bordes)

4 93.532

3 25.33

Bagian 4

3 82.293

3 25.50
3 25.50

Bagian 5

3 82.761

4 29.64

4 146.299
Bagian 6

4 29.83
4 147.131

19 38.90

Bagian 7 (Depan)

19 198.500

10 20.60

10 105.090

Kanopi Depan
10 105.090

Kanopi Depan
PELAT LANTAI

Dimensi (m)
Gambar Tulangan Bentang (m)
a b c
Tul Memanjang Ø8 -150

3.15 3.09 0.048 -

Tul Melintang Ø8 -150

4.2 4.14 0.048 -

Tul Memanjang Ø8 -200

2 1.94 0.048 -

Tul Melintang Ø8 -200

3.15 3.09 0.048 -

Tul Memanjang Ø8 -200

0.5 0.44 0.048 -


0.5 0.44 0.048 -

Tul Melintang Ø8 -200

1.17 1.11 0.048 -

Tul Memanjang Ø8 -200

3.15 3.09 0.048 -

Tul Melintang Ø8 -200

2 1.94 0.048 -

Tul Memanjang Ø8 -200

6.6 6.54 0.048 -

Tul Melintang Ø8 -200

0.9 0.84 0.048 -


Tul Memanjang Ø8 -200

0.5 0.44 0.048 -

Tul Melintang Ø8 -200

2.3 2.24 0.048 -

Tul Memanjang Ø10 -150

8.6 8.54 0.06 -

Tul Melintang Ø10 -150

5.8 5.74 0.06 -

Tul Memanjang Ø10 -150

5.4 5.34 0.06 -

Tul Melintang Ø8 -150

5.8 5.74 0.048 -


5.8 5.74 0.048 -

Tul Memanjang Ø12 -150

2.2 2.14 0.072 -

Tul Melintang Ø12 -150

1.5 1.44 0.072 -

Tul Memanjang Ø10 -150

6.4 6.34 0.06 -

Tul Melintang Ø10 -150

4.2 4.14 0.06 -

Tul Memanjang Ø10 -150

5.4 5.34 0.06 -


5.4 5.34 0.06 -

Tul Melintang Ø10 -150

2.2 2.14 0.06 -

Tul Memanjang Ø10 -150

3.332 3.272 0.06 -

Tul Melintang Ø10 -150

0.935 0.875 0.06 -

Tul Memanjang Ø10 -150

1.216 1.156 0.06 -

Tul Melintang Ø10 -150

2.933 2.873 0.06 -


2.933 2.873 0.06 -

Tul Memanjang Ø8 -200

4.184 4.124 0.048 -

Tul Melintang Ø8 -200

3.5 3.44 0.048 -

Tul Memanjang Ø8 -200

4.549 4.489 0.048 -

Tul Melintang Ø8 -200

0.5 0.44 0.048 -

Tul Memanjang Ø8 -200

1.9 1.84 0.048 -

Tul Melintang Ø8 -200

0.5 0.44 0.048 -


0.5 0.44 0.048 -

Volume Total (Kg)

Volume Total (/10Kg)


PELAT LANTAI

Panjang Tul (m) Jumlah (bh) Berat Tul (Kg/m) Volume (Kg)

3.186 22 0.395 27.686

4.236 29 0.395 48.523

2.036 11 0.395 8.846

3.186 16.75 0.395 21.079

0.536 3.5 0.395 0.741


0.536 3.5 0.395 0.741

1.206 6.85 0.395 3.263

3.186 16.75 0.395 21.079

2.036 11 0.395 8.846

6.636 34 0.395 89.121

0.936 5.5 0.395 2.033


0.536 3.5 0.395 0.741

2.336 12.5 0.395 11.534

8.66 58.33 0.617 311.688

5.86 39.67 0.617 143.420

5.46 37.00 0.617 124.646

5.836 39.67 0.395 91.440


5.836 39.67 0.395 91.440

2.284 15.67 0.892 31.918

1.584 11.00 0.892 15.542

6.46 43.67 0.617 174.047

4.26 29.00 0.617 76.224

5.46 37.00 0.617 124.646


5.46 37.00 0.617 124.646

2.26 15.67 0.617 21.846

3.392 23.21 0.617 48.582

0.995 7.23 0.617 4.441

1.276 9.11 0.617 7.170

2.993 20.55 0.617 37.955


2.993 20.55 0.617 37.955

4.22 21.92 0.395 36.538

3.536 18.50 0.395 25.839

4.585 23.75 0.395 43.004

0.536 3.50 0.395 0.741

1.936 10.50 0.395 8.030

0.536 3.50 0.395 0.741


0.536 3.50 0.395 0.741

1571.955

157.196
Nama As Gambar Tulangan
Tul Memanjang Ø8 -150

F1-G1

Tul Melintang Ø8 -150

1G-7G

Tul Memanjang Ø8 -150

A3-C3

Tul Melintang Ø8 -150

3A-4A

Tul Memanjang Ø8 -150

4A-7A
4A-7A

Tul Melintang Ø8 -150

A4-B'4

Tul Memanjang Ø8 -150

Tul Melintang Ø8 -150

Bagian Depan
Tul Memanjang Ø8 -150

Tul Melintang Ø8 -150


Tul Memanjang Ø8 -150

Tul Melintang Ø8 -150

Kanopi Jendela

Tul Memanjang Ø8 -150

Tul Melintang Ø8 -150

Kanopi Jendela

Tul Memanjang Ø8 -150

Tul Melintang Ø8 -150

Kanopi Jendela
Kanopi Jendela
PELAT ATAP

Dimensi (m)
Gambar Tulangan Bentang (m)
a b c
Tul Memanjang Ø8 -150

2.2 2.14 0.048 -

Tul Melintang Ø8 -150

10 9.94 0.048 -

Tul Memanjang Ø8 -150

5.4 5.34 0.048 -

Tul Melintang Ø8 -150

2.2 2.14 0.048 -

Tul Memanjang Ø8 -150

1.575 1.515 0.048 -


1.575 1.515 0.048 -

Tul Melintang Ø8 -150

5.8 5.74 0.048 -

Tul Memanjang Ø8 -150

1.15 1.09 0.048 -

Tul Melintang Ø8 -150

3 2.94 0.048 -

Tul Memanjang Ø8 -150

4.15 4.09 0.048 -

Tul Melintang Ø8 -150

1 0.94 0.048 -
Tul Memanjang Ø8 -150

0.5 0.44 0.048 -

Tul Melintang Ø8 -150

1.9 1.84 0.048 -

Tul Memanjang Ø8 -150

0.5 0.44 0.048 -

Tul Melintang Ø8 -150

1.9 1.84 0.048 -

Tul Memanjang Ø8 -150

0.5 0.44 0.048 -

Tul Melintang Ø8 -150

1.9 1.84 0.048 -


1.9 1.84 0.048 -

Volume Total (Kg)

Volume Total (/10Kg)


AT ATAP

Panjang Tul (m) Jumlah (bh) Berat Tul (Kg/m) Volume (Kg)

2.236 15.67 0.395 13.837

10.036 67.67 0.395 268.246

5.436 37.00 0.395 79.447

2.236 15.67 0.395 13.837

1.611 11.50 0.395 7.318


1.611 11.50 0.395 7.318

5.836 39.67 0.395 91.440

1.186 8.67 0.395 4.060

3.036 21.00 0.395 25.184

4.186 28.67 0.395 47.399

1.036 7.67 0.395 3.137


0.536 4.33 0.395 0.917

1.936 13.67 0.395 10.451

0.536 4.33 0.395 0.917

1.936 13.67 0.395 10.451

0.536 4.33 0.395 0.917

1.936 13.67 0.395 10.451


1.936 13.67 0.395 10.451

588.012

58.801
RIN

Sengkang RB 1 Gambar Bentang (m) Ø

Tumpuan 2.2 Ø8-10

Lapangan 2.2 Ø8-15

Sengkang RB 2 Gambar Bentang (m) Ø

Tumpuan 2 Ø8-10

Lapangan 2 Ø8-15

Tumpuan 2.2 Ø8-10

Lapangan 2.2 Ø8-15


Lapangan 2.2 Ø8-15

Tumpuan 1.8 Ø8-10

Lapangan 1.8 Ø8-15

Tumpuan 4 Ø8-10

Lapangan 4 Ø8-15

Tumpuan 3.4 Ø8-10

Lapangan 3.4 Ø8-15


Lapangan 3.4 Ø8-15

Tumpuan 3 Ø8-10

Lapangan 3 Ø8-15

Tumpuan 2.25 Ø8-10

Lapangan 2.25 Ø8-15

Tumpuan 3.15 Ø8-10

Lapangan 3.15 Ø8-15


Tumpuan 1.575 Ø8-10

Lapangan 1.575 Ø8-15

Tumpuan 3.825 Ø8-10

Lapangan 3.825 Ø8-15

Tumpuan 10 Ø8-10

Lapangan 10 Ø8-15

Sengkang RB 3 Gambar Bentang (m) Ø

Tumpuan 6.4 Ø8-10


Tumpuan 6.4 Ø8-10

Lapangan 6.4 Ø8-15

Tumpuan 3.4 Ø8-10

Lapangan 3.4 Ø8-15

Tumpuan 5 Ø8-10

Lapangan 5 Ø8-15

Tumpuan 2.2 Ø8-10


Tumpuan 2.2 Ø8-10

Lapangan 2.2 Ø8-15

Tumpuan 5.4 Ø8-10

Lapangan 5.4 Ø8-15

Tumpuan 9 Ø8-10

Lapangan 9 Ø8-15

Tumpuan 6 Ø8-10
Lapangan 6 Ø8-15

Sengkang RB 4 Gambar Bentang (m) Ø

Tumpuan 5.8 Ø8-10

Lapangan 5.8 Ø8-15

Tumpuan 6 Ø8-10

Lapangan 6 Ø8-15

Tumpuan 6.4 Ø8-10

Lapangan 6.4 Ø8-15


Lapangan 6.4 Ø8-15

Tul. Pokok RB 1 Gambar Bentang (m) Ø

Tul. Bawah 2.2 12

Tul. Atas 2.2 12

Tul. Pokok RB 2 Gambar Bentang (m) Ø

Tul. Bawah 2 12

Tul. Atas 2 12

Tul. Bawah 2.2 12

Tul. Atas 2.2 12

Tul. Bawah 1.8 12

Tul. Atas 1.8 12


Tul. Atas 1.8 12

Tul. Bawah 4 12

Tul. Atas 4 12

Tul. Bawah 3.4 12

Tul. Atas 3.4 12

Tul. Bawah 3 12

Tul. Atas 3 12

Tul. Bawah 2.25 12

Tul. Atas 2.25 12

Tul. Bawah 3.15 12

Tul. Atas 3.15 12

Tul. Bawah 1.575 12


Tul. Atas 1.575 12

Tul. Bawah 3.825 12

Tul. Atas 3.825 12

Tul. Bawah 10 12

Tul. Atas 10 12

Tul. Pokok RB 3 Gambar Bentang (m) Ø

Tul. Tumpuan 6.4 12

Tul. Lapangan 6.4 12

Tul. Pokok Atas 6.4 12

Tul. Pokok Bawah 6.4 12

Tul. Tumpuan 3.4 12

Tul. Lapangan 3.4 12


Tul. Lapangan 3.4 12

Tul. Pokok Atas 3.4 12

Tul. Pokok Bawah 3.4 12

Tul. Tumpuan 5 12

Tul. Lapangan 5 12

Tul. Pokok Atas 5 12

Tul. Pokok Bawah 5 12

Tul. Tumpuan 2.2 12

Tul. Lapangan 2.2 12

Tul. Pokok Atas 2.2 12

Tul. Pokok Bawah 2.2 12

Tul. Tumpuan 5.4 12


Tul. Tumpuan 5.4 12

Tul. Lapangan 5.4 12

Tul. Pokok Atas 5.4 12

Tul. Pokok Bawah 5.4 12

Tul. Tumpuan 9 12

Tul. Lapangan 9 12

Tul. Pokok Atas 9 12

Tul. Pokok Bawah 9 12

Tul. Tumpuan 6 12

Tul. Lapangan 6 12

Tul. Pokok Atas 6 12

Tul. Pokok Bawah 6 12


Tul. Pokok RB 4 Gambar Bentang (m) Ø

Tul. Tumpuan 5.8 12

Tul. Pokok Atas 5.8 12

Tul. Pokok Bawah 5.8 12

Tul. Tumpuan 6 12

Tul. Pokok Atas 6 12

Tul. Pokok Bawah 6 12

Tul. Tumpuan 6.4 12

Tul. Pokok Atas 6.4 12

Tul. Pokok Bawah 6.4 12


RING BALOK

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c

0.07 0.15 0.048 0.536 6.5 0.395

0.07 0.15 0.048 0.536 8.3 0.395

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c

0.07 0.19 0.048 0.616 6.0 0.395

0.07 0.19 0.048 0.616 7.7 0.395

0.07 0.19 0.048 0.616 6.5 0.395

0.07 0.19 0.048 0.616 8.3 0.395


0.07 0.19 0.048 0.616 8.3 0.395

0.07 0.19 0.048 0.616 5.5 0.395

0.07 0.19 0.048 0.616 7.0 0.395

0.07 0.19 0.048 0.616 11.0 0.395

0.07 0.19 0.048 0.616 14.3 0.395

0.07 0.19 0.048 0.616 9.5 0.395

0.07 0.19 0.048 0.616 12.3 0.395


0.07 0.19 0.048 0.616 12.3 0.395

0.07 0.19 0.048 0.616 8.5 0.395

0.07 0.19 0.048 0.616 11.0 0.395

0.07 0.19 0.048 0.616 6.6 0.395

0.07 0.19 0.048 0.616 8.5 0.395

0.07 0.19 0.048 0.616 8.9 0.395

0.07 0.19 0.048 0.616 11.5 0.395


0.07 0.19 0.048 0.616 4.9 0.395

0.07 0.19 0.048 0.616 6.3 0.395

0.07 0.19 0.048 0.616 10.6 0.395

0.07 0.19 0.048 0.616 13.8 0.395

0.07 0.19 0.048 0.616 26.0 0.395

0.07 0.19 0.048 0.616 34.3 0.395

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c

0.07 0.24 0.048 0.716 17.0 0.395


0.07 0.24 0.048 0.716 17.0 0.395

0.07 0.24 0.048 0.716 22.3 0.395

0.07 0.24 0.048 0.716 9.5 0.395

0.07 0.24 0.048 0.716 12.3 0.395

0.07 0.24 0.048 0.716 13.5 0.395

0.07 0.24 0.048 0.716 17.7 0.395

0.07 0.24 0.048 0.716 6.5 0.395


0.07 0.24 0.048 0.716 6.5 0.395

0.07 0.24 0.048 0.716 8.3 0.395

0.07 0.24 0.048 0.716 14.5 0.395

0.07 0.24 0.048 0.716 19.0 0.395

0.07 0.24 0.048 0.716 23.5 0.395

0.07 0.24 0.048 0.716 31.0 0.395

0.07 0.24 0.048 0.716 16.0 0.395


0.07 0.24 0.048 0.716 21.0 0.395

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c

0.07 0.29 0.048 0.816 15.5 0.395

0.07 0.29 0.048 0.816 20.3 0.395

0.07 0.29 0.048 0.816 16.0 0.395

0.07 0.29 0.048 0.816 21.0 0.395

0.07 0.29 0.048 0.816 17.0 0.395

0.07 0.29 0.048 0.816 22.3 0.395


0.07 0.29 0.048 0.816 22.3 0.395

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c

2.14 0.14 0.072 2.564 2 0.892

2.14 0.14 0.072 2.564 2 0.892

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c

1.94 0.14 0.072 2.364 2 0.892

1.94 0.14 0.072 2.364 2 0.892

2.14 0.14 0.072 2.564 2 0.892

2.14 0.14 0.072 2.564 2 0.892

1.74 0.14 0.072 2.164 2 0.892

1.74 0.14 0.072 2.164 2 0.892


1.74 0.14 0.072 2.164 2 0.892

3.94 0.14 0.072 4.364 2 0.892

3.94 0.14 0.072 4.364 2 0.892

3.34 0.14 0.072 3.764 2 0.892

3.34 0.14 0.072 3.764 2 0.892

2.94 0.14 0.072 3.364 2 0.892

2.94 0.14 0.072 3.364 2 0.892

2.19 0.14 0.072 2.614 2 0.892

2.19 0.14 0.072 2.614 2 0.892

3.09 0.14 0.072 3.514 2 0.892

3.09 0.14 0.072 3.514 2 0.892

1.515 0.14 0.072 1.939 2 0.892


1.515 0.14 0.072 1.939 2 0.892

3.765 0.14 0.072 4.189 2 0.892

3.765 0.14 0.072 4.189 2 0.892

9.94 0.14 0.072 10.364 2 0.892

9.94 0.14 0.072 10.364 2 0.892

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c

1.84 0.24 0.072 2.224 2 0.892

3.68 0.072 - 3.824 1 0.892

6.34 0.24 0.072 6.964 2 0.892

6.34 0.24 0.072 6.964 2 0.892

1.09 0.24 0.072 1.474 2 0.892

2.18 0.072 - 2.324 1 0.892


2.18 0.072 - 2.324 1 0.892

3.34 0.24 0.072 3.964 2 0.892

3.34 0.24 0.072 3.964 2 0.892

1.49 0.24 0.072 1.874 2 0.892

2.98 0.072 - 3.124 1 0.892

4.94 0.24 0.072 5.564 2 0.892

4.94 0.24 0.072 5.564 2 0.892

0.79 0.24 0.072 1.174 2 0.892

1.58 0.072 - 1.724 1 0.892

2.14 0.24 0.072 2.764 2 0.892

2.14 0.24 0.072 2.764 2 0.892

1.59 0.24 0.072 1.974 2 0.892


1.59 0.24 0.072 1.974 2 0.892

3.18 0.072 - 3.324 1 0.892

5.34 0.24 0.072 5.964 2 0.892

5.34 0.24 0.072 5.964 2 0.892

2.49 0.24 0.072 2.874 2 0.892

4.98 0.072 - 5.124 1 0.892

8.94 0.24 0.072 9.564 2 0.892

8.94 0.24 0.072 9.564 2 0.892

1.74 0.24 0.072 2.124 2 0.892

3.48 0.072 - 3.624 1 0.892

5.94 0.24 0.072 6.564 2 0.892

5.94 0.24 0.072 6.564 2 0.892


Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c

1.69 0.29 0.072 2.124 4 0.892

5.74 0.29 0.072 6.464 2 0.892

5.74 0.29 0.072 6.464 2 0.892

1.74 0.29 0.072 2.174 4 0.892

5.94 0.29 0.072 6.664 2 0.892

5.94 0.29 0.072 6.664 2 0.892

1.84 0.29 0.072 2.274 4 0.892

6.34 0.29 0.072 7.064 2 0.892

6.34 0.29 0.072 7.064 2 0.892


Volume (Kg) Sengkang B1 Gambar

2.752 Tumpuan

1.764 Lapangan

Volume (Kg)

Tumpuan

2.920

Lapangan

1.865

Sengkang B2A Gambar

3.163
Tumpuan

2.028
2.028
Lapangan

2.677
Tumpuan

1.703
Lapangan

5.353
Tumpuan

3.488
Lapangan

4.623
Tumpuan

3.001
Lapangan
3.001
Lapangan

4.136
Tumpuan

2.677
Lapangan

Sengkang B2B Gambar


3.224

Tumpuan

2.068

Lapangan

4.319

Tumpuan

2.798

Lapangan
Lapangan

2.403

Tumpuan

1.521

Lapangan

5.140

Tumpuan

3.346

Lapangan

12.653

Sengkang B3A Gambar

8.354 Tumpuan

Volume (Kg)

Lapangan

9.616
Lapangan

9.616

Tumpuan

6.316

Lapangan

5.374

Tumpuan

3.488

Lapangan

7.636

Tumpuan

4.996

Lapangan

3.677
Lapangan

3.677

Tumpuan

2.357

Lapangan

8.202

Tumpuan

5.374

Lapangan

13.293

Sengkang B3B Gambar

8.767
Tumpuan

9.050
Lapangan
Lapangan

5.939
Tumpuan

Volume (Kg)

Lapangan
9.992

Tumpuan
6.554

Lapangan
10.314

Sengkang B4A Gambar

6.769

Tumpuan

10.959

Lapangan

7.198
Lapangan

7.198

Tumpuan

Volume (Kg)

Lapangan
4.574

4.574 Sengkang B4B Gambar

Volume (Kg)
Tumpuan

4.217

4.217
Lapangan

4.574

Tumpuan
4.574

3.861

Lapangan
3.861
Lapangan
3.861

7.785
Tumpuan

7.785

6.715
Lapangan

6.715

Tumpuan
6.001

6.001

Lapangan
4.663

4.663 Sengkang B5B Gambar

6.269
Tumpuan

6.269

Lapangan
3.459
Lapangan

3.459

Tumpuan
7.473

7.473
Lapangan

18.489

18.489
Tumpuan

Volume (Kg)

3.968
Lapangan

3.411

Sengkang B6A Gambar

12.424

Tumpuan
12.424

2.630
Lapangan

2.073
Lapangan

2.073

Sengkang B6B Gambar


7.072

Tumpuan
7.072

3.343

Lapangan
2.787

9.926 Sengkang BC1 Gambar

9.926
Tumpuan

2.094

Lapangan
1.538

4.931

Tumpuan
4.931

3.522
Lapangan
3.522
Lapangan

2.965

Sengkang BC2 Gambar


10.640

Tumpuan
10.640

5.127

Lapangan
4.571

17.062

17.062

3.789

3.233

11.710

11.710
Volume (Kg)

7.578

11.532

11.532

7.757

11.889

11.889

8.114

12.602

12.602
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

3.09 Ø8-150 0.07 0.14 0.048 0.516 6.2

3.09 Ø8-200 0.07 0.14 0.048 0.516 8.7

14.94 Ø8-150 0.07 0.14 0.048 0.516 25.9

14.94 Ø8-200 0.07 0.14 0.048 0.516 38.4

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

3.94 Ø8-150 0.07 0.19 0.048 0.616 7.6


3.94 Ø8-200 0.07 0.19 0.048 0.616 10.9

7.03 Ø8-150 0.07 0.19 0.048 0.616 12.7

7.03 Ø8-200 0.07 0.19 0.048 0.616 18.6

12.2 Ø8-150 0.07 0.19 0.048 0.616 21.3

12.2 Ø8-200 0.07 0.19 0.048 0.616 31.5

1.7 Ø8-150 0.07 0.19 0.048 0.616 3.8

1.7 Ø8-200 0.07 0.19 0.048 0.616 5.3


1.7 Ø8-200 0.07 0.19 0.048 0.616 5.3

10 Ø8-150 0.07 0.19 0.048 0.616 17.7

10 Ø8-200 0.07 0.19 0.048 0.616 26.0

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

9.29 Ø8-150 0.07 0.19 0.048 0.616 16.5

9.29 Ø8-200 0.07 0.19 0.048 0.616 24.2

3 Ø8-150 0.07 0.19 0.048 0.616 6.0

3 Ø8-200 0.07 0.19 0.048 0.616 8.5


3 Ø8-200 0.07 0.19 0.048 0.616 8.5

4 Ø8-150 0.07 0.19 0.048 0.616 7.7

4 Ø8-200 0.07 0.19 0.048 0.616 11.0

1.59 Ø8-150 0.07 0.19 0.048 0.616 3.7

1.59 Ø8-200 0.07 0.19 0.048 0.616 5.0

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

3.4 Ø8-150 0.07 0.19 0.048 0.616 6.7

3.4 Ø8-200 0.07 0.19 0.048 0.616 9.5


3.4 Ø8-200 0.07 0.19 0.048 0.616 9.5

3 Ø8-150 0.07 0.19 0.048 0.616 6.0

3 Ø8-200 0.07 0.19 0.048 0.616 8.5

5.54 Ø8-150 0.07 0.19 0.048 0.616 10.2

5.54 Ø8-200 0.07 0.19 0.048 0.616 14.9

4 Ø8-150 0.07 0.19 0.048 0.616 7.7

4 Ø8-200 0.07 0.19 0.048 0.616 11.0


4 Ø8-200 0.07 0.19 0.048 0.616 11.0

2.5 Ø8-150 0.07 0.19 0.048 0.616 5.2

2.5 Ø8-200 0.07 0.19 0.048 0.616 7.3

6.54 Ø8-150 0.07 0.19 0.048 0.616 11.9

6.54 Ø8-200 0.07 0.19 0.048 0.616 17.4

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

3 Ø8-150 0.07 0.24 0.048 0.716 6.0

3 Ø8-200 0.07 0.24 0.048 0.716 8.5


3 Ø8-200 0.07 0.24 0.048 0.716 8.5

5.34 Ø8-150 0.07 0.24 0.048 0.716 9.9

5.34 Ø8-200 0.07 0.24 0.048 0.716 14.4

5.8 Ø8-150 0.07 0.24 0.048 0.716 10.7

5.8 Ø8-200 0.07 0.24 0.048 0.716 15.5

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

10.68 Ø8-150 0.07 0.29 0.048 0.816 18.8

10.68 Ø8-200 0.07 0.29 0.048 0.816 27.7


10.68 Ø8-200 0.07 0.29 0.048 0.816 27.7

4 Ø8-150 0.07 0.29 0.048 0.816 7.7

4 Ø8-200 0.07 0.29 0.048 0.816 11.0

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

3 Ø8-150 0.07 0.29 0.048 0.816 6.0

3 Ø8-200 0.07 0.29 0.048 0.816 8.5

6.91 Ø8-150 0.07 0.29 0.048 0.816 12.5

6.91 Ø8-200 0.07 0.29 0.048 0.816 18.3


6.91 Ø8-200 0.07 0.29 0.048 0.816 18.3

5.24 Ø8-150 0.07 0.29 0.048 0.816 9.7

5.24 Ø8-200 0.07 0.29 0.048 0.816 14.1

7 Ø8-150 0.07 0.29 0.048 0.816 12.7

7 Ø8-200 0.07 0.29 0.048 0.816 18.5

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

5.33 Ø8-150 0.14 0.29 0.048 0.956 9.9

5.33 Ø8-200 0.14 0.29 0.048 0.956 14.3


5.33 Ø8-200 0.14 0.29 0.048 0.956 14.3

13.87 Ø8-150 0.14 0.29 0.048 0.956 24.1

13.87 Ø8-200 0.14 0.29 0.048 0.956 35.7

5.8 Ø8-150 0.14 0.29 0.048 0.956 10.7

5.8 Ø8-200 0.14 0.29 0.048 0.956 15.5

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

8.54 Ø8-150 0.14 0.34 0.048 1.056 15.2

8.54 Ø8-200 0.14 0.34 0.048 1.056 22.4


8.54 Ø8-200 0.14 0.34 0.048 1.056 22.4

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

5.33 Ø8-150 0.14 0.34 0.048 1.056 9.9

5.33 Ø8-200 0.14 0.34 0.048 1.056 14.3

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

3.4 Ø8-150 0.06 0.14 0.048 0.496 6.7

3.4 Ø8-200 0.06 0.14 0.048 0.496 9.5

9.883 Ø8-150 0.06 0.14 0.048 0.496 17.5

9.883 Ø8-200 0.06 0.14 0.048 0.496 25.7


9.883 Ø8-200 0.06 0.14 0.048 0.496 25.7

Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c

3 Ø8-150 0.06 0.19 0.048 0.596 6.0

3 Ø8-200 0.06 0.19 0.048 0.596 8.5


BALOK

Berat (kg/m) Volume (Kg) Tu. Pokok B1 Gambar

Tul. Bawah
0.395 2.507

Tul. Atas

Tul. Bawah
0.395 1.778

Tul. Atas

0.395 10.558
Tu. Pokok B2A Gambar

Tul. Bawah

0.395 7.816
Tul. Atas

Tul. Bawah
Berat (kg/m) Volume (Kg)

Tul. Atas
0.395 3.682

Tul. Bawah
Tul. Bawah

Tul. Atas
0.395 2.640

Tul. Bawah

0.395 6.188
Tul. Atas

Tul. Bawah

0.395 4.520
Tul. Atas

Tul. Pokok B2B Gambar

0.395 10.382
Tul. Tumpuan

Tul. Tumpuan
0.395 7.665

Tul. Lapangan

Tul. Pokok Atas


0.395 1.865

Tul. Pokok Bawah

0.395 1.277
Tul. Tumpuan
0.395 1.277
Tul. Tumpuan

Tul. Tumpuan

0.395 8.597
Tul. Lapangan

Tul. Pokok Atas


0.395 6.326

Tul. Pokok Bawah

Berat (kg/m) Volume (Kg)


Tul. Tumpuan

0.395 8.021
Tul. Tumpuan

Tul. Lapangan

0.395 5.894
Tul. Pokok Atas

Tul. Pokok Bawah


0.395 2.920

Tul. Tumpuan

Tul. Tumpuan
0.395 2.068
Tul. Tumpuan
0.395 2.068

Tul. Lapangan

0.395 3.731
Tul. Pokok Atas

Tul. Pokok Bawah

0.395 2.677
Tul. Pokok B3A Gambar

Tul. Tumpuan

0.395 1.776
Tul. Tumpuan

Tul. Lapangan
0.395 1.211

Tul. Pokok Atas

Berat (kg/m) Volume (Kg)


Tul. Pokok Bawah

0.395 3.244
Tul. Tumpuan

Tul. Tumpuan

0.395 2.312
0.395 2.312
Tul. Lapangan

Tul. Pokok Atas


0.395 2.920

Tul. Pokok Bawah

Tul. Tumpuan
0.395 2.068

Tul. Tumpuan

0.395 4.980
Tul. Lapangan

Tul. Pokok Atas

0.395 3.613
Tul. Pokok Bawah

Tul. Tumpuan
0.395 3.731

Tul. Tumpuan

Tul. Lapangan
0.395 2.677

Tul. Pokok Atas


0.395 2.677

Tul. Pokok Atas

0.395 2.514
Tul. Pokok Bawah

Tul. Tumpuan

0.395 1.764
Tul. Tumpuan

Tul. Lapangan
0.395 5.791

Tul. Pokok Atas

Tul. Pokok Bawah


0.395 4.222

Tul. Tumpuan

Berat (kg/m) Volume (Kg)

Tul. Tumpuan

0.395 3.394
Tul. Lapangan

Tul. Pokok Atas


0.395 2.404

Tul. Pokok Bawah


0.395 2.404

Tul. Pokok Bawah

Tul. Pokok B3B Gambar


0.395 5.600

Tul. Tumpuan

Tul. Lapangan
0.395 4.058

Tul. Pokok Atas

0.395 6.033
Tul. Pokok Bawah

Tul. Tumpuan

0.395 4.384
Tul. Lapangan

Berat (kg/m) Volume (Kg) Tul. Pokok Atas

Tul. Pokok Bawah


0.395 12.119

Tul. Tumpuan

0.395 8.928
Tul. Lapangan
0.395 8.928

Tul. Pokok Atas

0.395 4.942
Tul. Pokok Bawah

Tul. Pokok B4A Gambar

0.395 3.546
Tul. Tumpuan

Berat (kg/m) Volume (Kg) Tul. Tumpuan

Tul. Lapangan
0.395 3.868

Tul. Pokok Atas

0.395 2.740
Tul. Pokok Bawah

Tul. Tumpuan

0.395 8.069
Tul. Tumpuan

Tul. Lapangan
0.395 5.890

Tul. Pokok Atas


0.395 5.890

Tul. Pokok Atas

Tul. Pokok Bawah


0.395 6.274

Tul. Pokok B4B Gambar

Tul. Tumpuan
0.395 4.545

Tul. Lapangan

0.395 8.165
Tul. Pokok Atas

Tul. Pokok Bawah

0.395 5.963
Tul. Tumpuan

Berat (kg/m) Volume (Kg) Tul. Lapangan

Tul. Pokok Atas


0.395 7.464

Tul. Pokok Bawah

0.395 5.409
Tul. Tumpuan
0.395 5.409

Tul. Lapangan

0.395 18.214
Tul. Pokok Atas

Tul. Pokok Bawah


0.395 13.472

Tul. Tumpuan

Tul. Lapangan
0.395 8.056

Tul. Pokok Atas

0.395 5.853
Tul. Pokok Bawah

Tul. Pokok B5B Gambar


Berat (kg/m) Volume (Kg)

Tul. Tumpuan

0.395 12.708
Tul. Lapangan

Tul. Pokok Atas


0.395 9.323

Tul. Pokok Bawah


0.395 9.323

Tul. Pokok Bawah

Berat (kg/m) Volume (Kg)


Tul. Tumpuan

0.395 8.245
Tul. Lapangan

Tul. Pokok Atas

0.395 5.975
Tul. Pokok Bawah

Berat (kg/m) Volume (Kg) Tul. Tumpuan

Tul. Lapangan
0.395 2.612

Tul. Pokok Atas

0.395 1.861
Tul. Pokok Bawah

Tul. Pokok B6A Gambar

0.395 6.846
Tul. Tumpuan

Tul. Lapangan

0.395 5.037
0.395 5.037
Tul. Pokok Atas

Berat (kg/m) Volume (Kg) Tul. Pokok Bawah

Tul. Pokok B6B Gambar


0.395 2.825

Tul. Tumpuan

Tul. Lapangan
0.395 2.001

Tul. Pokok Atas

Tul. Pokok Bawah

Tu. Pokok BC1 Gambar

Tul. Bawah

Tul. Atas

Tul. Bawah

Tul. Atas
Tul. Atas

Tul. Pokok BC2 Gambar

Tul. Tumpuan

Tul. Bawah

Tul. Atas
Dimensi (m)
Gambar Bentang (m) Ø
a b c

3.09 12 3.03 0.14 0.072

3.09 12 3.03 0.14 0.072

14.94 12 14.88 0.14 0.072

14.94 12 14.88 0.14 0.072

Dimensi (m)
Gambar Bentang (m) Ø
a b c

3.94 12 3.88 0.14 0.072

3.94 12 3.88 0.14 0.072

7.03 12 6.97 0.14 0.072

7.03 12 6.97 0.14 0.072

12.2 12 12.14 0.14 0.072


12.2 12 12.14 0.14 0.072

12.2 12 12.14 0.14 0.072

1.7 12 1.64 0.14 0.072

1.7 12 1.64 0.14 0.072

10 12 9.94 0.14 0.072

10 12 9.94 0.14 0.072

Dimensi (m)
Gambar Bentang (m) Ø
a b c

9.29 12 2.56 0.19 0.072

9.29 12 2.56 0.072 -

9.29 12 5.13 0.072 -

9.29 12 9.23 0.19 0.072

9.29 12 9.23 0.19 0.072

3 12 0.99 0.19 0.072


3 12 0.99 0.19 0.072

3 12 0.99 0.072 -

3 12 1.98 0.072 -

3 12 2.94 0.19 0.072

3 12 2.94 0.19 0.072

4 12 1.24 0.19 0.072

4 12 1.24 0.072 -

4 12 2.48 0.072 -

4 12 3.94 0.19 0.072

4 12 3.94 0.19 0.072

1.59 12 0.64 0.19 0.072

1.59 12 0.64 0.072 -


1.59 12 0.64 0.072 -

1.59 12 1.28 0.072 -

1.59 12 1.53 0.19 0.072

1.59 12 1.53 0.19 0.072

Dimensi (m)
Gambar Bentang (m) Ø
a b c

3.4 12 1.09 0.24 0.072

3.4 12 1.09 0.072 -

3.4 12 2.18 0.072 -

3.4 12 3.34 0.24 0.072

3.4 12 3.34 0.24 0.072

3 12 0.99 0.24 0.072

3 12 0.99 0.072 -
3 12 1.98 0.072 -

3 12 2.94 0.24 0.072

3 12 2.94 0.24 0.072

5.54 12 1.63 0.24 0.072

5.54 12 1.63 0.072 -

5.54 12 3.25 0.072 -

5.54 12 5.48 0.24 0.072

5.54 12 5.48 0.24 0.072

4 12 1.24 0.24 0.072

4 12 1.24 0.072 -

4 12 2.48 0.072 -

4 12 3.94 0.24 0.072


4 12 3.94 0.24 0.072

4 12 3.94 0.24 0.072

2.5 12 0.87 0.24 0.072

2.5 12 0.87 0.072 -

2.5 12 1.73 0.072 -

2.5 12 2.44 0.24 0.072

2.5 12 2.44 0.24 0.072

6.54 12 1.88 0.24 0.072

6.54 12 1.88 0.072 -

6.54 12 3.75 0.072 -

6.54 12 6.48 0.24 0.072

6.54 12 6.48 0.24 0.072


6.54 12 6.48 0.24 0.072

Dimensi (m)
Gambar Bentang (m) Ø
a b c

3 12 0.99 0.24 0.072

3 12 1.98 0.072 -

3 12 2.94 0.24 0.072

3 12 2.94 0.24 0.072

5.34 12 1.58 0.24 0.072

5.34 12 3.15 0.072 -

5.34 12 5.28 0.24 0.072

5.34 12 5.28 0.24 0.072

5.8 12 1.69 0.24 0.072

5.8 12 3.38 0.072 -


5.8 12 5.74 0.24 0.072

5.8 12 5.74 0.24 0.072

Dimensi (m)
Gambar Bentang (m) Ø
a b c

10.68 12 2.91 0.29 0.072

10.68 12 2.91 0.072 -

10.68 12 5.82 0.072 -

10.68 12 10.62 0.29 0.072

10.68 12 10.62 0.29 0.072

4 12 1.24 0.29 0.072

4 12 1.24 0.072 -

4 12 2.48 0.072 -

4 12 3.94 0.29 0.072


4 12 3.94 0.29 0.072

4 12 3.94 0.29 0.072

Dimensi (m)
Gambar Bentang (m) Ø
a b c

3 12 0.99 0.29 0.072

3 12 1.98 0.072 -

3 12 2.94 0.29 0.072

3 12 2.94 0.29 0.072

6.91 12 1.97 0.29 0.072

6.91 12 3.94 0.072 -

6.91 12 6.85 0.29 0.072

6.91 12 6.85 0.29 0.072

5.24 12 1.55 0.29 0.072


5.24 12 3.10 0.072 -

5.24 12 5.18 0.29 0.072

5.24 12 5.18 0.29 0.072

7 12 1.99 0.29 0.072

7 12 3.98 0.072 -

7 12 6.94 0.29 0.072

7 12 6.94 0.29 0.072

Dimensi (m)
Gambar Bentang (m) D
a b c

5.33 13 1.59 0.29 0.078

5.33 13 3.19 0.078 -

5.33 13 5.27 0.29 0.078

5.33 13 5.27 0.29 0.078


5.33 13 5.27 0.29 0.078

13.87 13 3.73 0.29 0.078

13.87 13 7.42 0.078 -

13.87 13 13.81 0.29 0.078

13.87 13 13.81 0.29 0.078

5.8 13 1.71 0.29 0.078

5.8 13 3.38 0.078 -

5.8 13 5.74 0.29 0.078

5.8 13 5.74 0.29 0.078

Dimensi (m)
Gambar Bentang (m) D
a b c

8.54 13 2.40 0.34 0.078

8.54 13 4.79 0.078 -


8.54 13 8.48 0.34 0.078

8.54 13 8.48 0.34 0.078

Dimensi (m)
Gambar Bentang (m) D
a b c

5.33 13 1.59 0.34 0.078

5.33 13 3.19 0.078 -

5.33 13 5.27 0.34 0.078

5.33 13 5.27 0.34 0.078

Dimensi (m)
Gambar Bentang (m) Ø
a b c

3.4 10 3.34 0.14 0.06

3.4 10 3.34 0.14 0.06

9.883 10 9.823 0.14 0.06

9.883 10 9.823 0.14 0.06


9.883 10 9.823 0.14 0.06

Dimensi (m)
Gambar Bentang (m) Ø
a b c

3 10 0.99 0.24 0.06

3 10 2.94 0.14 0.06

3 10 2.94 0.14 0.06


Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

3.454 2 0.892 6.162

3.454 2 0.892 6.162

15.304 2 0.892 27.302

15.304 2 0.892 27.302

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

4.304 2 0.892 7.678

4.304 2 0.892 7.678

7.394 2 0.892 13.191

7.394 2 0.892 13.191

12.564 2 0.892 22.414


12.564 2 0.892 22.414

12.564 2 0.892 22.414

2.064 2 0.892 3.682

2.064 2 0.892 3.682

10.364 2 0.892 18.489

10.364 2 0.892 18.489

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

2.897 4 0.892 10.335

2.7065 2 0.892 4.828

5.269 3 0.892 14.100

9.754 2 0.892 17.401

9.754 2 0.892 17.401

1.324 4 0.892 4.724


1.324 4 0.892 4.724

1.134 2 0.892 2.023

2.124 3 0.892 5.684

3.464 2 0.892 6.180

3.464 2 0.892 6.180

1.574 4 0.892 5.616

1.384 3 0.892 3.704

2.624 2 0.892 4.681

4.464 2 0.892 7.964

4.464 2 0.892 7.964

0.972 4 0.892 3.466

0.7815 2 0.892 1.394


0.7815 2 0.892 1.394

1.419 3 0.892 3.797

2.054 2 0.892 3.664

2.054 2 0.892 3.664

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

1.474 4 0.892 5.259

1.234 2 0.892 2.201

2.324 3 0.892 6.219

3.964 2 0.892 7.072

3.964 2 0.892 7.072

1.374 4 0.892 4.902

1.134 2 0.892 2.023


2.124 3 0.892 5.684

3.564 2 0.892 6.358

3.564 2 0.892 6.358

2.009 4 0.892 7.168

1.769 2 0.892 3.156

3.394 3 0.892 9.082

6.104 2 0.892 10.890

6.104 2 0.892 10.890

1.624 4 0.892 5.794

1.384 2 0.892 2.469

2.624 3 0.892 7.022

4.564 2 0.892 8.142


4.564 2 0.892 8.142

4.564 2 0.892 8.142

1.249 4 0.892 4.456

1.009 2 0.892 1.800

1.874 3 0.892 5.015

3.064 2 0.892 5.466

3.064 2 0.892 5.466

2.259 4 0.892 8.060

2.019 2 0.892 3.602

3.894 3 0.892 10.420

7.104 2 0.892 12.674

7.104 2 0.892 12.674


7.104 2 0.892 12.674

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

1.374 2 0.892 2.451

2.124 1 0.892 1.895

3.564 2 0.892 6.358

3.564 2 0.892 6.358

1.959 2 0.892 3.495

3.294 1 0.892 2.938

5.904 2 0.892 10.533

5.904 2 0.892 10.533

2.074 2 0.892 3.700

3.524 1 0.892 3.143


6.364 2 0.892 11.353

6.364 2 0.892 11.353

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

3.344 4 0.892 11.931

3.054 2 0.892 5.448

5.964 3 0.892 15.960

11.344 2 0.892 20.238

11.344 2 0.892 20.238

1.674 4 0.892 5.973

1.384 2 0.892 2.469

2.624 3 0.892 7.022

4.664 2 0.892 8.321


4.664 2 0.892 8.321

4.664 2 0.892 8.321

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

1.424 2 0.892 2.540

2.124 1 0.892 1.895

3.664 2 0.892 6.537

3.664 2 0.892 6.537

2.402 2 0.892 4.284

4.079 1 0.892 3.638

7.574 2 0.892 13.512

7.574 2 0.892 13.512

1.984 2 0.892 3.539


3.244 1 0.892 2.894

5.904 2 0.892 10.533

5.904 2 0.892 10.533

2.424 2 0.892 4.324

4.124 1 0.892 3.679

7.664 2 0.892 13.673

7.664 2 0.892 13.673

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

2.039 2 1.04 4.240

3.341 1 1.04 3.475

6.006 2 1.04 12.492

6.006 2 1.04 12.492


6.006 2 1.04 12.492

4.174 2 1.04 8.681

7.571 1 1.04 7.874

14.546 2 1.04 30.256

14.546 2 1.04 30.256

2.156 2 1.04 4.484

3.536 1 1.04 3.677

6.476 2 1.04 13.470

6.476 2 1.04 13.470

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

2.891 4 1.04 12.027

4.946 2 1.04 10.288


9.316 4 1.04 38.755

9.316 4 1.04 38.755

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

2.089 4 1.04 8.688

3.341 1 1.04 3.475

6.106 2 1.04 12.700

6.106 2 1.04 12.700

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

3.74 2 0.616 4.608

3.74 2 0.616 4.608

10.223 2 0.616 12.595

10.223 2 0.616 12.595


10.223 2 0.616 12.595

Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)

1.350 4 0.892 4.817

3.34 2 0.616 4.115

3.34 3 0.616 6.172


Dimensi (m)
Gambar Tulangan Tangga Lebar Tangga (m) Ø
a b
Tul 1 (Ø12 -150)

1 12 3.498 0.281

Tul 2 (Ø8 -200)

1 8 0.424 0.281

Tul 3 (Ø12 -150)

1 12 3.144 0.281

Tul 4 (Utama Ø12)

1 12 0.94 0.072
1 12 0.94 0.072

Tul 5 (Ø12 -150)

1 12 3.223 0.156

Tul 6 (Ø12 -150)

1 12 3.206 0.217

Total Volume (Per 10Kg)


TANGGA

Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
c d

0.303 0.072 4.226 7.67 0.892 28.90

0.072 - 0.849 120 0.395 40.24

0.142 0.072 3.711 7.67 0.892 25.38

- - 1.084 123 0.892 118.93


- - 1.084 123 0.892 118.93

0.072 - 3.451 7.67 0.892 23.60

0.072 - 3.495 7.67 0.892 23.90

26.095
Per 10Kg)
GGA

Dimensi (m)
Gambar Tulangan Bordes Tangga Bentang (m) Ø
a b c

1.5 Ø8-200 0.07 0.19 0.048

Tulangan Balok Bordes

1.5 12 1.44 0.072 -

Tulangan Plat Bordes (Memanjang)

2.2 12 2.14 0.072 -

Tulangan Plat Bordes (Melintang)

1.5 12 1.47 0.072 -


1.5 12 1.47 0.072 -

Total Volume (Per 10Kg)


nsi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
d

- 0.616 8.5 0.395 2.068

- 1.584 6 0.892 16.955

- 2.3 15.667 0.892 63.836

- 1.6 11 0.892 31.673


- 1.6 11 0.892 31.673

11.453
ANALISA HARGA SATUAN PEKERJ

Harga Satuan (R
NO URAIAN KOEF SAT
Upah
1 2 3 4 5
E PEKERJAAN DINDI
E.1 Pemasangan 1 m2 Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 4 PP
Pekerja 0.6 Oh Rp 95,600.00
Tukang Batu 0.2 Oh Rp 109,300.00
Kepala Tukang Batu 0.02 Oh Rp 120,000.00
Mandor 0.03 Oh Rp 131,000.00
Bata Merah 140 Buah -
Semen Portland 26.55 Kg -
Pasir Pasang 0.093 m3 -
JUMLAH
E.2 Pemasangan 1 m2 Plesteran 1 SP : 4 PP Tebal 15 mm
Pekerja 0.3 Oh Rp 95,600.00
Tukang Batu 0.15 Oh Rp 109,300.00
Kepala Tukang Batu 0.015 Oh Rp 120,000.00
Mandor 0.015 Oh Rp 131,000.00
Semen Portland 6.24 Kg -
Pasir Pasang 0.024 m3 -
JUMLAH
E.3 Pemasangan 1 m2 Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 2 PP
Pekerja 0.6 Oh Rp 95,600.00
Tukang Batu 0.2 Oh Rp 109,300.00
Kepala Tukang Batu 0.02 Oh Rp 120,000.00
Mandor 0.03 Oh Rp 131,000.00
Bata Merah 140 Buah -
Semen Portland 43.5 Kg -
Pasir Pasang 0.08 m3 -
JUMLAH
E.4 Pemasangan 1 m2 Plesteran 1 SP : 2 PP Tebal 15 mm
Pekerja 0.3 Oh Rp 95,600.00
Tukang Batu 0.15 Oh Rp 109,300.00
Kepala Tukang Batu 0.015 Oh Rp 120,000.00
Mandor 0.015 Oh Rp 131,000.00
Semen Portland 10.224 Kg -
Pasir Pasang 0.02 m3 -
JUMLAH
E.5 Pemasangan 1 m2 Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C)
Pekerja 0.9 Oh Rp 95,600.00
Tukang Batu 0.45 Oh Rp 109,300.00
Kepala Tukang Batu 0.045 Oh Rp 120,000.00
Mandor 0.045 Oh Rp 131,000.00
Keramik Dinding 20x25 Roman Polos 20 Buah -
Semen Portland 9.3 Kg -
Pasir Pasang 0.018 m3 -
Semen Warna 1.94 Kg -
JUMLAH
E.6 Pemasangan 1 m2 Acian
Pekerja 0.2 Oh Rp 95,600.00
Tukang Batu 0.1 Oh Rp 109,300.00
Kepala Tukang Batu 0.01 Oh Rp 120,000.00
Mandor 0.01 Oh Rp 131,000.00
Semen Portland 3.25 Kg -
JUMLAH
SATUAN PEKERJAAN DINDING

Harga Satuan (Rp) Jumlah Harga (Rp)


Jumlah (Rp)
Bahan Alat Upah Bahan Alat
6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)
PEKERJAAN DINDING
uran 1 SP : 4 PP
- - Rp 57,360.00 - - Rp 57,360.00
- - Rp 21,860.00 - - Rp 21,860.00
- - Rp 2,400.00 - - Rp 2,400.00
- - Rp 3,930.00 - - Rp 3,930.00
Rp 700.00 - - Rp 98,000.00 - Rp 98,000.00
Rp 1,100.00 - - Rp 29,205.00 - Rp 29,205.00
Rp 224,500.00 - - Rp 20,878.50 - Rp 20,878.50
Rp 85,550.00 Rp 148,083.50 - Rp 233,633.50

- - Rp 28,680.00 - - Rp 28,680.00
- - Rp 16,395.00 - - Rp 16,395.00
- - Rp 1,800.00 - - Rp 1,800.00
- - Rp 1,965.00 - - Rp 1,965.00
Rp 1,100.00 - - Rp 6,864.00 - Rp 6,864.00
Rp 224,500.00 - - Rp 5,388.00 - Rp 5,388.00
Rp 48,840.00 Rp 12,252.00 - Rp 61,092.00
uran 1 SP : 2 PP
- - Rp 57,360.00 - - Rp 57,360.00
- - Rp 21,860.00 - - Rp 21,860.00
- - Rp 2,400.00 - - Rp 2,400.00
- - Rp 3,930.00 - - Rp 3,930.00
Rp 700.00 - - Rp 98,000.00 - Rp 98,000.00
Rp 1,100.00 - - Rp 47,850.00 - Rp 47,850.00
Rp 224,500.00 - - Rp 17,960.00 - Rp 17,960.00
Rp 85,550.00 Rp 163,810.00 - Rp 249,360.00

- - Rp 28,680.00 - - Rp 28,680.00
- - Rp 16,395.00 - - Rp 16,395.00
- - Rp 1,800.00 - - Rp 1,800.00
- - Rp 1,965.00 - - Rp 1,965.00
Rp 1,100.00 - - Rp 11,246.40 - Rp 11,246.40
Rp 224,500.00 - - Rp 4,490.00 - Rp 4,490.00
Rp 48,840.00 Rp 15,736.40 - Rp 64,576.40
longan C)
- - Rp 86,040.00 - - Rp 86,040.00
- - Rp 49,185.00 - - Rp 49,185.00
- - Rp 5,400.00 - - Rp 5,400.00
- - Rp 5,895.00 - - Rp 5,895.00
Rp 4,675.00 - - Rp 93,500.00 - Rp 93,500.00
Rp 1,100.00 - - Rp 10,230.00 - Rp 10,230.00
Rp 224,500.00 - - Rp 4,041.00 - Rp 4,041.00
Rp 15,000.00 - - Rp 29,100.00 - Rp 29,100.00
Rp 146,520.00 Rp 136,871.00 - Rp 283,391.00

- - Rp 19,120.00 - - Rp 19,120.00
- - Rp 10,930.00 - - Rp 10,930.00
- - Rp 1,200.00 - - Rp 1,200.00
- - Rp 1,310.00 - - Rp 1,310.00
Rp 1,100.00 - - Rp 3,575.00 - Rp 3,575.00
Rp 32,560.00 Rp 3,575.00 - Rp 36,135.00
KEBUTUHA

No Uraian Pekerjaan
1 2
E
E.1 Pemasangan 1 m2 Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 4 PP
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Bata Merah
Semen Portland
Pasir Pasang

No Uraian Pekerjaan
1 2
E.2 Pemasangan 1 m2 Plesteran 1 SP : 4 PP Tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Pasang

No Uraian Pekerjaan
1 2
E.3 Pemasangan 1 m2 Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 2 PP
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Bata Merah
Semen Portland
Pasir Pasang

No Uraian Pekerjaan
No Uraian Pekerjaan
1 2
E.4 Pemasangan 1 m2 Plesteran 1 SP : 2 PP Tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Pasang

No Uraian Pekerjaan
1 2
E.5 Pemasangan 1 m2 Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Keramik Dinding 20x25 Roman Polos
Semen Portland
Pasir Pasang
Semen Warna

No Uraian Pekerjaan
1 2
E.6 Pemasangan 1 m2 Acian
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
KEBUTUHAN BAHAN DAN TENAGA KERJA PEKERJAAN DINDING

Harga Satuan (Rp)


Vol Koef Satuan
Upah Bahan Alat
3 4 5 6 7 8
PEKERJAAN DINDING
ampuran 1 SP : 4 PP 551.03 - m2
0.6 Oh Rp 95,600.00 - -
0.2 Oh Rp 109,300.00 - -
0.02 Oh Rp 120,000.00 - -
0.03 Oh Rp 131,000.00 - -
140 Buah - Rp 700.00 -
26.55 Kg - Rp 1,100.00 -
0.093 m3 - Rp 224,500.00 -
Jum
To
Harga Satuan (Rp)
Vol Koef Satuan
Upah Bahan Alat
3 4 5 6 7 8
1102.06 - m2
0.3 Oh Rp 95,600.00 - -
0.15 Oh Rp 109,300.00 - -
0.015 Oh Rp 120,000.00 - -
0.015 Oh Rp 131,000.00 - -
6.24 Kg - Rp 1,100.00 -
0.024 m3 - Rp 224,500.00 -
Jum
To
Harga Satuan (Rp)
Vol Koef Satuan
Upah Bahan Alat
3 4 5 6 7 8
ampuran 1 SP : 2 PP 115.474 - m2
0.6 Oh Rp 95,600.00 - -
0.2 Oh Rp 109,300.00 - -
0.02 Oh Rp 120,000.00 - -
0.03 Oh Rp 131,000.00 - -
140 Buah - Rp 700.00 -
43.5 Kg - Rp 1,100.00 -
0.08 m3 - Rp 224,500.00 -
Jum
To
Harga Satuan (Rp)
Vol Koef Satuan
Vol Koef Satuan
Upah Bahan Alat
3 4 5 6 7 8
47.9 - m2
0.3 Oh Rp 95,600.00 - -
0.15 Oh Rp 109,300.00 - -
0.015 Oh Rp 120,000.00 - -
0.015 Oh Rp 131,000.00 - -
10.224 Kg - Rp 1,100.00 -
0.02 m3 - Rp 224,500.00 -
Jum
To
Harga Satuan (Rp)
Vol Koef Satuan
Upah Bahan Alat
3 4 5 6 7 8
(Golongan C) 91.524 - m2
0.9 Oh Rp 95,600.00 - -
0.45 Oh Rp 109,300.00 - -
0.045 Oh Rp 120,000.00 - -
0.045 Oh Rp 131,000.00 - -
20 Buah - Rp 4,675.00 -
9.3 Kg - Rp 1,100.00 -
0.018 m3 - Rp 224,500.00 -
1.94 Kg - Rp 15,000.00 -
Jum
To
Harga Satuan (Rp)
Vol Koef Satuan
Upah Bahan Alat
3 4 5 6 7 8
1149.960 - m2
0.2 Oh Rp 95,600.00 - -
0.1 Oh Rp 109,300.00 - -
0.01 Oh Rp 120,000.00 - -
0.01 Oh Rp 131,000.00 - -
3.25 Kg - Rp 1,100.00 -
Jum
To
DINDING

Jumlah yang Dibutuhkan Harga Material (Rp)


Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

330.618 - - Rp 31,607,080.80 - -
110.206 - - Rp 12,045,515.80 - -
11.0206 - - Rp 1,322,472.00 - -
16.5309 - - Rp 2,165,547.90 - -
- 77144.2 - - Rp 54,000,940.00 -
- 14629.8465 - - Rp 16,092,831.15 -
- 51.24579 - - Rp 11,504,679.86 -
Jumlah Rp 47,140,616.50 Rp 81,598,451.01 -
Total Rp 128,739,067.51
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

330.618 - - Rp 31,607,080.80 - -
165.309 - - Rp 18,068,273.70 - -
16.5309 - - Rp 1,983,708.00 - -
16.5309 - - Rp 2,165,547.90 - -
- 6876.8544 - - Rp 7,564,539.84 -
- 26.44944 - - Rp 5,937,899.28 -
Jumlah Rp 53,824,610.40 Rp 13,502,439.12 -
Total Rp 67,327,049.52
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

69.2844 - - Rp 6,623,588.64 - -
23.0948 - - Rp 2,524,261.64 - -
2.30948 - - Rp 277,137.60 - -
3.46422 - - Rp 453,812.82 - -
- 16166.36 - - Rp 11,316,452.00 -
- 5023.119 - - Rp 5,525,430.90 -
- 9.23792 - - Rp 2,073,913.04 -
Jumlah Rp 9,878,800.70 Rp 18,915,795.94 -
Total Rp 28,794,596.64
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

14.37 - - Rp 1,373,772.00 - -
7.185 - - Rp 785,320.50 - -
0.7185 - - Rp 86,220.00 - -
0.7185 - - Rp 94,123.50 - -
- 489.7296 - - Rp 538,702.56 -
- 0.958 - - Rp 215,071.00 -
Jumlah Rp 2,339,436.00 Rp 753,773.56 -
Total Rp 3,093,209.56
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

82.37196 - - Rp 7,874,759.38 - -
41.18598 - - Rp 4,501,627.61 - -
4.118598 - - Rp 494,231.76 - -
4.118598 - - Rp 539,536.34 - -
- 1830.488 - - Rp 8,557,531.40 -
- 851.17692 - - Rp 936,294.61 -
- 1.6474392 - - Rp 369,850.10 -
- 177.557336 - - Rp 2,663,360.04 -
Jumlah Rp 13,410,155.09 Rp 12,527,036.15 -
Total Rp 25,937,191.24
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

229.992 - - Rp 21,987,235.20 - -
114.996 - - Rp 12,569,062.80 - -
11.4996 - - Rp 1,379,952.00 - -
11.4996 - - Rp 1,506,447.60 - -
- 3737.37 - - Rp 4,111,107.00 -
Jumlah Rp 37,442,697.60 Rp 4,111,107.00 -
Total Rp 41,553,804.60
PAS. DINDING 1 PC : 4 PS LANTAI 1 

No As Horizontal Panjang (m) Tinggi (m) Jenis Kusen


1 F1-G1 2.2 3.78 GB
2 D1-F1 3.4 3.78 J1
3 C3-D3 3 3.78 PJ 4
4 A2-C2 5.4 3.78 PG
5 E7-G7 4 3.78 P1
6 B7-E7 6.85 3.78 PJ2 + J3
7 A7-B7 3.15 3.78 PJ3
8 A6-B6 3.15 3.78 P1
9 B5-C5 2.25 3.78 -
10 Tambahan 1 0.9 3.78 -
11 Tambahan 2 0.9 3.78 -
12 A10-B10 3.15 3.43 -
13 A'9-B9 1.15 3.43 P4
Total Luas

PAS. DINDING 1 PC : 4 PS LANTAI 2

No As Horizontal Panjang (m) Tinggi (m) Jenis Kusen


1 F1-G1 2.2 3.805 J2
2 D1-F1 3.4 3.805 J1
3 C2-D2 3 3.805 P3+J5
4 E5-G5 4 3.805 P1
5 C5-E5 4.6 3.805 P1
6 E7-G7 4 3.805 J1
7 C7-E7 4.6 3.805 J1
8 A7-C7 5.4 3.805 J1
Total Luas

PAS. DINDING 1 PC : 2 PS LANTAI 1 

No As Horizontal Panjang (m) Tinggi (m) Jenis Kusen


1 C'4-D'4 1.5 3 -
2 C'5-D'5 1.5 3 -
3 A8-B'8 1.885 3 -
4 A9-B'9 1.885 3 -
5 E10-G10 4 3 -
6 E9-G9 4 3 P2
Total Luas

PAS. DINDING 1 PC : 2 PS LANTAI 2 

No As Horizontal Panjang (m) Tinggi (m) Jenis Kusen


1 A3-B3 3.15 3 3*J7
2 B3-C3 2.25 3 J7
3 A4-B4 3.15 3 P2
4 B4-C'4 1.65 3 -
5 Tambahan 0.6 3 -
Total Luas
VOLUME PEKER

4 PS LANTAI 1  PAS. DINDING

Luas Kusen (m2) Luas Dinding (m2) No As Vertikal


0.196 8.12 1 1'A-7A
2.295 10.557 2 9A-10A
6.05 5.29 3 9B-10B
12.036 8.376 4 7B-9B
2.25 12.87 5 5B-6B
6.051+2.99 16.852 6 Tambahan
2.25 9.657 7 1''C-4C
2.25 9.657 8 1''C-3C
- 8.505 9 1F-4F
- 3.402 10 1G-7G
- 3.402 11 7G-9G
- 10.8045 12 7A-8A
1.935 2.0095 13 7E-9E
109.502 Total Luas

4 PS LANTAI 2

Luas Kusen (m2) Luas Dinding (m2) PAS. DINDIN


2.28 6.091
2.295 10.642 No As Vertikal
2.193+2.25 6.972 1 1'G-7G
2.25 12.97 2 1F-4F
2.25 15.253 3 1D-2D
2.295 12.925 4 2C-3C
2.295 15.208 5 4A-7'A
2.295 18.252 6 4C-7C
98.313 7 5E-7E
Total Luas

2 PS LANTAI 1 

Luas Kusen (m2) Luas Dinding (m2) PAS. DINDING


- 4.5
- 4.5 No As Vertikal
- 5.655 1 4C'-5C'
- 5.655 2 4D'-5D'
- 12 3 8A-9A
1.72 10.28 4 8A'-9A'
42.59 5 9E-10E
6 9G-10G
2 PS LANTAI 2  Total Luas

Luas Kusen (m2) Luas Dinding (m2) PAS. DINDIN


3 X 0.38 8.31
0.38 6.37 No As Vertikal
1.72 7.73 1 3A-4A
- 4.95 2 3B-4B
- 1.8 3 3C-4'C
29.16 4 Tambahan
Total Luas

VOL

No Plesteran
1 Pas Dinding 1 PC : 4 PS
2 Pas Dinding 1 PC : 2 PS
Total (m2)

Volume Pemasangan Dinding Keramik 2

No As Horizontal
1 C'4-D'4
2 C'5-D'5
3 E10-G10
4 E9-G9
5 A8-B'8
6 A9-B'9
Total Luas

Volume Pemasangan Dinding Keramik 2

No As Horizontal
1 A3-B3
2 B3-C3
3 A4-B4
4 B4-C'4
5 Tambahan
Total Luas
VOLUME PEKERJAAN DINDING

PAS. DINDING 1 PC : 4 PS LANTAI 1 

Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
12 3.78 - - 45.36
2 3.43 - - 6.86
2 3.43 J4 1.19 5.67
8 3.43 PB 1.914 25.526
1 3.78 - - 3.78
0.7 3.78 - - 2.646
4.7 3.78 - - 17.766
2.5 3.78 - - 9.45
4.2 3.78 - - 15.876
11 3.78 41.58
8 3.43
6 3.43 20.58
8 3.43 2*J1 2.295 22.85
Total Luas 217.944

PAS. DINDING 1 PC : 4 PS LANTAI 2

Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
11 3.805 - - 41.855
4.2 3.805 - - 15.981
0.5 3.805 - - 1.9025
1.5 3.805 J5 1.088 4.6195
6.8 3.805 25.874
5.8 3.805 P1 2.25 19.819
4 3.805 - - 15.22
Total Luas 125.271

PAS. DINDING 1 PC : 2 PS LANTAI 1 

Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
1.8 3 GB 0.196 5.204
1.8 3 P2 1.72 3.68
1.2 3 - - 3.6
1.2 3 P2* 1.72 1.88
2 3 BV 0.36 5.64
2 3 - - 6
Total Luas 26.004

PAS. DINDING 1 PC : 2 PS LANTAI 2

Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
2.2 3 - - 6.6
2.2 3 - - 6.6
1.3 3 P2 1.72 2.18
0.78 3 - - 2.34
Total Luas 17.72

VOLUME ACIAN 

Volume (m2)
1102.06
47.9
1149.96

masangan Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C) Lantai 1

Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
1.5 1.8 - - 2.7
1.5 1.8 - - 2.7
4 3 - - 12
4 3 P2 1.72 10.28
1.885 1.8 - - 3.393
1.885 1.8 - - 3.393
Total Luas 34.466

masangan Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C) Lantai 2

Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
3.15 2.48 3*J7 3 X 0.38 6.672
2.25 2.48 J7 0.38 5.2
3.15 2.48 P2 1.72 6.092
1.65 2.48 - - 4.092
0.6 2.48 - - 1.488
Total Luas 23.544
PERHITUNGAN BANYAKNYA KOLOM LANTAI 1 PAS. BATA 1 PC : 4 PS 

Ukuran (m)
Tipe Kolom Jumlah
No b h Tinggi
1 K1 0.13 0.2 3 7
2 K2A 0.13 0.25 3 19
3 K2B 0.13 0.25 3 2
4 K3 0.13 0.3 3 4
5 K4A 0.13 0.35 3 3
6 K4B 0.13 0.35 3 2
7 KP 0.13 0.13 3 10
Total Luas

PERHITUNGAN BANYAKNYA KOLOM LANTAI 2 PAS. BATA 1 PC : 4 PS 

Ukuran (m)
Tipe Kolom Jumlah
No b h Tinggi
1 K1 0.13 0.2 3 4
2 K2A 0.13 0.25 3 16
4 K3 0.13 0.3 3 1
7 KP 0.13 0.13 3 4
Total Luas

Vol Plesteran = 2 x Vol. Pas Bata 1 PC : 4 PS


2 x 551.03
1102.06

PERHITUNGAN BANYAKNYA KOLOM LANTAI 1 PAS. BATA 1 PC : 2 PS 

Ukuran (m)
Tipe Kolom Jumlah
No b h Tinggi
1 K2A 0.13 0.25 3 4
2 KP 0.13 0.13 3 8
Total Luas
PERHITUNGAN BANYAKNYA KOLOM LANTAI 2 PAS. BATA 1 PC : 2 PS 

Ukuran (m)
Tipe Kolom Jumlah
No b h Tinggi
1 K1 0.13 0.2 3 2
2 K2A 0.13 0.25 3 3
3 K2B 0.13 0.25 3 1
5 K4A 0.13 0.35 3 1
7 KP 0.13 0.13 3 3
Total Luas

Vol Plesteran = 2 x (Vol. Pas Bata 1 PC : 2 PS-Vol Dinding Keramik)


2 x (115.474-91.524)
47.9

Volume Pemasangan Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C) Lantai 1

No As Vertikal Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2)
1 4C'-5C' 1.8 1.8 GB 0.196
2 4D'-5D' 1.8 1.8 P2 1.72
3 8A-9A 1.2 1.8 - -
4 8A'-9A' 1.2 1.8 P2* 1.72
5 9E-10E 2 3 - -
6 9G-10G 2 3 - -
Total Luas

Volume Pemasangan Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C) Lantai 2

No As Vertikal Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2)
1 3A-4A 2.2 2.48
2 3B-4B 2.2 2.48
3 3C-4'C 1.3 2.48 P2 1.72
4 Tambahan 0.78 2.48
Total Luas
NO
TA 1 PC : 4 PS 
1
E.1
Luas (m2)
E.2
13.86 E.3
43.32 E.4
4.56 E.5
10.32 E.6
8.64
5.76
15.6
102.06 No
1
TA 1 PC : 4 PS  1
2
3
Luas (m2)
4
7.92
36.48
2.58 No
6.24 1
53.22 1
2
3
4
5

TA 1 PC : 2 PS 

Luas (m2)
9.12
12.48
21.6
TA 1 PC : 2 PS 

Luas (m2)
3.96
6.84
2.28
2.88
4.68
20.64

Keramik)

Golongan C) Lantai 1

Luas Dinding (m2)


3.044
1.52
2.16
0.44
6
6
19.164

Golongan C) Lantai 2

Luas Dinding (m2)


5.456
5.456
1.504
1.9344
14.3504
URUTAN PEKERJAAN
2
Pemasangan 1 m2 Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 4 PP
Pemasangan 1 m2 Plesteran 1 SP : 4 PP Tebal 15 mm
Pemasangan 1 m2 Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 2 PP
Pemasangan 1 m2 Plesteran 1 SP : 2 PP Tebal 15 mm
Pemasangan 1 m2 Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C)
Pemasangan 1 m2 Acian
Total Anggaran Biaya

Tenaga Kerja
2
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Total

Bahan
2
Bata Merah
Semen Portland
Pasir Pasang
Keramik Dinding 20x25 Roman Polos
Semen Warna
Total
RENCANA ANGGARAN BIAYA PEKERJAAN DINDING

HARGA SATUAN JUMLAH HARGA


VOL SAT
UPAH BAHAN UPAH
3 4 5 6 7 = (3x5)
551.03 m2 Rp 85,550.00 Rp 148,083.50 Rp 47,140,616.50
1102.06 m2 Rp 48,840.00 Rp 12,252.00 Rp 53,824,610.40
115.474 m2 Rp 85,550.00 Rp 163,810.00 Rp 9,878,800.70
47.9 m2 Rp 48,840.00 Rp 15,736.40 Rp 2,339,436.00
91.524 m2 Rp 146,520.00 Rp 136,871.00 Rp 13,410,155.09
1149.960 m2 Rp 32,560.00 Rp 3,575.00 Rp 37,442,697.60
iaya Rp 164,036,316.29

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah


3 4 5 6 = (4 x 5)
Oh 1057.254 Rp 95,600.00 Rp 101,073,516.82
Oh 461.977 Rp 109,300.00 Rp 50,494,062.05
Oh 46.198 Rp 120,000.00 Rp 5,543,721.36
Oh 52.863 Rp 131,000.00 Rp 6,925,016.06
Rp 164,036,316.29

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Bahan


3 4 5 6 = (4 x 5)
Buah 93310.560 Rp 700.00 Rp 65,317,392.00
Kg 31608.096 Rp 1,100.00 Rp 34,768,906.06
m3 89.539 Rp 224,500.00 Rp 20,101,413.28
Buah 1830.488 Rp 4,675.00 Rp 8,557,531.40
Kg 177.557 Rp 15,000.00 Rp 2,663,360.04
Rp 131,408,602.78
N DINDING

JUMLAH HARGA TOTAL HARGA


BAHAN (UPAH+BAHAN)
8 = (3x6) 9 = (7+8)
Rp 81,598,451.01 Rp 128,739,067.51
Rp 13,502,439.12 Rp 67,327,049.52
Rp 18,915,795.94 Rp 28,794,596.64
Rp 753,773.56 Rp 3,093,209.56
Rp 12,527,036.15 Rp 25,937,191.24
Rp 4,111,107.00 Rp 41,553,804.60
Rp 131,408,602.78 Rp 295,444,919.07
ANALISA HARGA SATUA

NO URAIAN KOEF SAT


1 2 3 4
F PEKERJAAN
F.1 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Jendela Kayu Kelas II
Pekerja 6 Oh
Tukang Kayu 18 Oh
Kepala Tukang Kayu 1.8 Oh
Mandor 0.3 Oh
Balok Kayu Kamper Samarinda 1.2 m3
Paku 10 cm 1.25 Kg
Lem Kayu 1 Kg
JUMLAH
F.2 Pembuatan dan Pemasangan 1 m Kusen Alumunium
Pekerja 0.043 Oh
Tukang Khusus Alumunium 0.043 Oh
Kepala Tukang Khusus Alumunium 0.0043 Oh
Mandor 0.0021 Oh
Profil Alumunium 1.1 m
Skrup Fixer 2 Buah
Sealant 0.06 Tube
JUMLAH
F.3 Pembuatan dan Pemasangan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Kelas II
Pekerja 0.85 Oh
Tukang Kayu 2.55 Oh
Kepala Tukang Kayu 0.255 Oh
Mandor 0.043 Oh
Kayu Papan Samarinda 0.025 m3
Lem Kayu 0.8 Kg
Paku 1" - 2,5" 0.03 Kg
Teakwood, t = 4mm , 90 x 220 mm 1 Lbr
Plat Seng Alumumium 0.5 Lbr
JUMLAH
F.4 Pemasangan 1 Unit Daun Pintu Alumunium P3
Pekerja 0.44 Oh
Tukang Khusus Alumunium 0.44 Oh
Kepala Tukang Khusus Alumunium 0.044 Oh
Mandor 0.022 Oh
Daun Pintu Alumunium 1 Buah
Engsel Pintu + Baut 1 Set
Kunci Pintu 1 Set
Handle Tarik (BLC AAH8 SS) 1 Pasang
JUMLAH
F.5 Pemasangan 1 Unit Daun Pintu PJ2
Pekerja 0.44 Oh
Tukang Khusus Alumunium 0.44 Oh
Kepala Tukang Khusus Alumunium 0.044 Oh
Mandor 0.022 Oh
Daun Pintu Alumunium 2 Buah
Engsel Pintu + Baut 2 Set
Kunci Pintu 1 Set
Handle Tarik 2 Pasang
JUMLAH
F.6 Pemasangan 1 Unit Daun Jendela Alumunium
Pekerja 0.44 Oh
Tukang Khusus Alumunium 0.44 Oh
Kepala Tukang Khusus Alumunium 0.044 Oh
Mandor 0.022 Oh
Daun Jendela Alumunium 1 Buah
Engsel Jendela 2 Set
Slot Jendela 1 1
Sealant 0.06 Tube
Accessories 1 ls
JUMLAH
F.7 Pemasangan 1 m2 Pintu Besi PB
Pekerja 0.65 Oh
Tukang Besi 0.65 Oh
Kepala Tukang Besi 0.065 Oh
Mandor 0.032 Oh
Pintu Besi + Accessories 1.5 m2
JUMLAH
F.8 Pemangan 1 Buah Glass Block
Pekerja 0.015 Oh
Tukang Kayu 0.15 Oh
Kepala Tukang Kayu 0.015 Oh
Mandor 0.0008 Oh
Glass Block 1 Buah
JUMLAH
F.9 Pemangan 1 m2 Kaca Polos Tebal 5 mm
Pekerja 0.015 Oh
Tukang Kayu 0.15 Oh
Kepala Tukang Kayu 0.015 Oh
Mandor 0.0008 Oh
Kaca Polos Tebal 5mm Asahi 1.1 m2
Sealant 0.05 Kg
JUMLAH
F.10 Pemasangan 1 Unit Engsel Pintu
Pekerja 0.015 Oh
Tukang Kayu 0.15 Oh
Kepala Tukang Kayu 0.015 Oh
Mandor 0.0008 Oh
Engsel Pintu (Stainless Eks.Otis 4"x3") 1 Buah
JUMLAH
F.11 Pemasangan 1 Buah Engsel Jendela
Pekerja 0.015 Oh
Tukang Kayu 0.15 Oh
Kepala Tukang Kayu 0.015 Oh
Mandor 0.0008 Oh
Engsel Jendela (Stainless Eks.Otis 3" x 2,5") 1 Buah
JUMLAH
F.12 Pemasangan 1 Buah Kunci Tanam
Pekerja 0.01 Oh
Tukang Kayu 0.5 Oh
Kepala Tukang Kayu 0.05 Oh
Mandor 0.005 Oh
Kunci Tanam (Eks. Ses Art 2030 40mm SS) 1 Buah
JUMLAH
F.13 Pemasangan 1 Buah Kunci Tanam Kamar Mandi
Pekerja 0.005 Oh
Tukang Kayu 0.5 Oh
Kepala Tukang Kayu 0.005 Oh
Mandor 0.0025 Oh
Kunci Tanam 1 Buah
JUMLAH
F.14 Pemasangan 1 Buah Pegangan Pintu
Pekerja 0.05 Oh
Tukang Kayu 0.5 Oh
Kepala Tukang Kayu 0.05 Oh
Mandor 0.003 Oh
Pegangan Pintu (BLC AAH 8 SS) 1 Buah
JUMLAH
F.15 Pemasangan 1 Buah Kait Angin
Pekerja 0.015 Oh
Tukang Kayu 0.15 Oh
Kepala Tukang Kayu 0.015 Oh
Mandor 0.008 Oh
Kait Angin 1 Buah
JUMLAH
F.16 Pemasangan 1 m2 Garasi Besi (Rolling Door)
Pekerja 1.2 Oh
Tukang Besi 1.2 Oh
Kepala Tukang Besi 0.12 Oh
Mandor 0.006 Oh
Pintu Besi Henderson 1.1 m2
JUMLAH
ANALISA HARGA SATUAN PEKERJAAN KUSEN

Harga Satuan (Rp) Jumlah Harga (Rp)


Upah Bahan Alat Upah Bahan
5 6 7 8 = (3 x 5) 9 = (3 x 6)
PEKERJAAN PINTU DAN JENDELA
u Kelas II
Rp 95,600.00 - - Rp 573,600.00 -
Rp 109,300.00 - - Rp 1,967,400.00 -
Rp 120,000.00 - - Rp 216,000.00 -
Rp 131,000.00 - - Rp 39,300.00 -
- Rp 8,500,000.00 - - Rp 10,200,000.00
- Rp 15,000.00 - - Rp 18,750.00
- Rp 15,000.00 - - Rp 15,000.00
Rp 2,796,300.00 Rp 10,233,750.00

Rp 95,600.00 - - Rp 4,110.80 -
Rp 109,300.00 - - Rp 4,699.90 -
Rp 120,000.00 - - Rp 516.00 -
Rp 131,000.00 - - Rp 275.10 -
- Rp 117,500.00 - - Rp 129,250.00
- Rp 283.33 - - Rp 566.66
- Rp 25,000.00 - - Rp 1,500.00
Rp 9,601.80 Rp 131,316.66
ngka Expose Kayu Kelas II
Rp 95,600.00 - - Rp 81,260.00 -
Rp 109,300.00 - - Rp 278,715.00 -
Rp 120,000.00 - - Rp 30,600.00 -
Rp 131,000.00 - - Rp 5,633.00 -
- Rp 9,000,000.00 - - Rp 225,000.00
- Rp 15,000.00 - - Rp 12,000.00
- Rp 25,000.00 - - Rp 750.00
- Rp 120,000.00 - - Rp 120,000.00
- Rp 26,400.00 - - Rp 13,200.00
Rp 396,208.00 Rp 370,950.00

Rp 95,600.00 - - Rp 42,064.00 -
Rp 109,300.00 - - Rp 48,092.00 -
Rp 120,000.00 - - Rp 5,280.00 -
Rp 131,000.00 - - Rp 2,882.00 -
- Rp 1,100,000.00 - - Rp 1,100,000.00
- Rp 55,000.00 - - Rp 55,000.00
- Rp 225,000.00 - - Rp 225,000.00
- Rp 200,000.00 - - Rp 200,000.00
Rp 98,318.00 Rp 1,580,000.00

Rp 95,600.00 - - Rp 42,064.00 -
Rp 109,300.00 - - Rp 48,092.00 -
Rp 120,000.00 - - Rp 5,280.00 -
Rp 131,000.00 - - Rp 2,882.00 -
- Rp 1,800,000.00 - - Rp 3,600,000.00
- Rp 55,000.00 - - Rp 110,000.00
- Rp 225,000.00 - - Rp 225,000.00
- Rp 200,000.00 - - Rp 400,000.00
Rp 98,318.00 Rp 4,335,000.00

Rp 95,600.00 - - Rp 42,064.00 -
Rp 109,300.00 - - Rp 48,092.00 -
Rp 120,000.00 - - Rp 5,280.00 -
Rp 131,000.00 - - Rp 2,882.00 -
- Rp 600,000.00 - - Rp 600,000.00
- Rp 45,000.00 - - Rp 90,000.00
- Rp 25,000.00 - - Rp 25,000.00
- Rp 25,000.00 - - Rp 1,500.00
Rp 50,000.00 - - Rp 50,000.00
Rp 98,318.00 Rp 766,500.00

Rp 95,600.00 - - Rp 62,140.00 -
Rp 109,300.00 - - Rp 71,045.00 -
Rp 120,000.00 - - Rp 7,800.00 -
Rp 131,000.00 - - Rp 4,192.00 -
Rp 642,000.00 - - Rp 963,000.00
Rp 145,177.00 Rp 963,000.00

Rp 95,600.00 - - Rp 1,434.00 -
Rp 109,300.00 - - Rp 16,395.00 -
Rp 120,000.00 - - Rp 1,800.00 -
Rp 131,000.00 - - Rp 104.80 -
- Rp 20,000.00 - - Rp 20,000.00
Rp 19,733.80 Rp 20,000.00

Rp 95,600.00 - - Rp 1,434.00 -
Rp 109,300.00 - - Rp 16,395.00 -
Rp 120,000.00 - - Rp 1,800.00 -
Rp 131,000.00 - - Rp 104.80 -
- Rp 116,600.00 - - Rp 128,260.00
- Rp 25,000.00 - - Rp 1,250.00
Rp 19,733.80 Rp 129,510.00

Rp 95,600.00 - - Rp 1,434.00 -
Rp 109,300.00 - - Rp 16,395.00 -
Rp 120,000.00 - - Rp 1,800.00 -
Rp 131,000.00 - - Rp 104.80 -
- Rp 41,500.00 - - Rp 41,500.00
Rp 19,733.80 Rp 41,500.00

Rp 95,600.00 - - Rp 1,434.00 -
Rp 109,300.00 - - Rp 16,395.00 -
Rp 120,000.00 - - Rp 1,800.00 -
Rp 131,000.00 - - Rp 104.80 -
- Rp 35,000.00 - - Rp 35,000.00
Rp 19,733.80 Rp 35,000.00

Rp 95,600.00 - - Rp 956.00 -
Rp 109,300.00 - - Rp 54,650.00 -
Rp 120,000.00 - - Rp 6,000.00 -
Rp 131,000.00 - - Rp 655.00 -
- Rp 210,000.00 - - Rp 210,000.00
Rp 62,261.00 Rp 210,000.00

Rp 95,600.00 - - Rp 478.00 -
Rp 109,300.00 - - Rp 54,650.00 -
Rp 120,000.00 - - Rp 600.00 -
Rp 131,000.00 - - Rp 327.50 -
- Rp 33,000.00 - - Rp 33,000.00
Rp 56,055.50 Rp 33,000.00

Rp 95,600.00 - - Rp 4,780.00 -
Rp 109,300.00 - - Rp 54,650.00 -
Rp 120,000.00 - - Rp 6,000.00 -
Rp 131,000.00 - - Rp 393.00 -
- Rp 200,000.00 - - Rp 200,000.00
Rp 65,823.00 Rp 200,000.00

Rp 95,600.00 - - Rp 1,434.00 -
Rp 109,300.00 - - Rp 16,395.00 -
Rp 120,000.00 - - Rp 1,800.00 -
Rp 131,000.00 - - Rp 1,048.00 -
- Rp 25,000.00 - - Rp 25,000.00
Rp 20,677.00 Rp 25,000.00

Rp 95,600.00 - - Rp 114,720.00 -
Rp 109,300.00 - - Rp 131,160.00 -
Rp 120,000.00 - - Rp 14,400.00 -
Rp 131,000.00 - - Rp 786.00 -
- Rp 1,600,000.00 - - Rp 1,760,000.00
Rp 261,066.00 Rp 1,760,000.00
Rp)
Jumlah (Rp) No Uraian Pekerjaan
Alat
10 = (3 x 7) 11 = ( 8+9+10) 1 2
F
F.1 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Jendela Kay
- Rp 573,600.00 Pekerja
- Rp 1,967,400.00 Tukang Kayu
- Rp 216,000.00 Kepala Tukang Kayu
- Rp 39,300.00 Mandor
- Rp 10,200,000.00 Balok Kayu Kamper Samarinda
- Rp 18,750.00 Paku 10 cm
- Rp 15,000.00 Lem Kayu
- Rp 13,030,050.00

- Rp 4,110.80
No Uraian Pekerjaan
- Rp 4,699.90
- Rp 516.00 1 2
- Rp 275.10 F.2 Pembuatan dan Pemasangan 1 m Kusen Alumunium
- Rp 129,250.00 Pekerja
- Rp 566.66 Tukang Khusus Alumunium
- Rp 1,500.00 Kepala Tukang Khusus Alumunium
- Rp 140,918.46 Mandor
Profil Alumunium
- Rp 81,260.00 Skrup Fixer
- Rp 278,715.00 Sealant
- Rp 30,600.00
- Rp 5,633.00
- Rp 225,000.00
No Uraian Pekerjaan
- Rp 12,000.00
- Rp 750.00 1 2
- Rp 120,000.00 F.3 Pembuatan dan Pemasangan 1 m2 Pintu Teakwood Rangkap, Ra
- Rp 13,200.00 Pekerja
- Rp 767,158.00 Tukang Kayu
Kepala Tukang Kayu
- Rp 42,064.00 Mandor
- Rp 48,092.00 Kayu Papan Samarinda
- Rp 5,280.00 Lem Kayu
- Rp 2,882.00 Paku 1" - 2,5"
- Rp 1,100,000.00 Teakwood, t = 4mm , 90 x 220 mm
- Rp 55,000.00 Plat Seng Alumumium
- Rp 225,000.00
- Rp 200,000.00
- Rp 1,678,318.00
No Uraian Pekerjaan
- Rp 42,064.00 1 2
- Rp 48,092.00 F.4 Pemasangan 1 Unit Daun Pintu Alumunium P3
- Rp 5,280.00 Pekerja
- Rp 2,882.00 Tukang Khusus Alumunium
- Rp 3,600,000.00 Kepala Tukang Khusus Alumunium
- Rp 110,000.00 Mandor
- Rp 225,000.00 Daun Pintu Alumunium
- Rp 400,000.00 Engsel Pintu + Baut
- Rp 4,433,318.00 Kunci Pintu
Handle Tarik (BLC AAH8 SS)
- Rp 42,064.00
- Rp 48,092.00
- Rp 5,280.00
No Uraian Pekerjaan
- Rp 2,882.00
- Rp 600,000.00 1 2
- Rp 90,000.00 F.5 Pemasangan 1 Unit Daun Pintu PJ2
- Rp 25,000.00 Pekerja
- Rp 1,500.00 Tukang Khusus Alumunium
- Rp 50,000.00 Kepala Tukang Khusus Alumunium
- Rp 864,818.00 Mandor
Daun Pintu Alumunium
- Rp 62,140.00 Engsel Pintu + Baut
- Rp 71,045.00 Kunci Pintu
- Rp 7,800.00 Handle Tarik
- Rp 4,192.00
- Rp 963,000.00
- Rp 1,108,177.00
No Uraian Pekerjaan
- Rp 1,434.00 1 2
- Rp 16,395.00 F.6 Pemasangan 1 Unit Daun Jendela Alumunium
- Rp 1,800.00 Pekerja
- Rp 104.80 Tukang Khusus Alumunium
- Rp 20,000.00 Kepala Tukang Khusus Alumunium
- Rp 39,733.80 Mandor
Daun Jendela Alumunium
- Rp 1,434.00 Engsel Jendela
- Rp 16,395.00 Slot Jendela
- Rp 1,800.00 Sealant
- Rp 104.80 Accessories
- Rp 128,260.00
- Rp 1,250.00
- Rp 149,243.80
No Uraian Pekerjaan
- Rp 1,434.00 1 2
- Rp 16,395.00 F.7 Pemasangan 1 m2 Pintu Besi
- Rp 1,800.00 Pekerja
- Rp 104.80 Tukang Besi
- Rp 41,500.00 Kepala Tukang Besi
- Rp 61,233.80 Mandor
Pintu Besi + Accessories
- Rp 1,434.00
- Rp 16,395.00
- Rp 1,800.00
No Uraian Pekerjaan
- Rp 104.80
- Rp 35,000.00 1 2
- Rp 54,733.80 F.8 Pemangan 1 Buah Glass Block
Pekerja
- Rp 956.00 Tukang Kayu
- Rp 54,650.00 Kepala Tukang Kayu
- Rp 6,000.00 Mandor
- Rp 655.00 Glass Block
- Rp 210,000.00
- Rp 272,261.00
No Uraian Pekerjaan
- Rp 478.00
- Rp 54,650.00 1 2
- Rp 600.00 F.9 Pemangan 1 m2 Kaca Polos Tebal 5 mm
- Rp 327.50 Pekerja
- Rp 33,000.00 Tukang Kayu
- Rp 89,055.50 Kepala Tukang Kayu
Mandor
- Rp 4,780.00 Kaca Polos Tebal 5mm Asahi
- Rp 54,650.00 Sealant
- Rp 6,000.00
- Rp 393.00
- Rp 200,000.00
No Uraian Pekerjaan
- Rp 265,823.00
1 2
- Rp 1,434.00 F.10 Pemasangan 1 Unit Engsel Pintu
- Rp 16,395.00 Pekerja
- Rp 1,800.00 Tukang Kayu
- Rp 1,048.00 Kepala Tukang Kayu
- Rp 25,000.00 Mandor
- Rp 45,677.00 Engsel Pintu (Stainless Eks.Otis 4"x3")

- Rp 114,720.00
- Rp 131,160.00
No Uraian Pekerjaan
- Rp 14,400.00
- Rp 786.00 1 2
- Rp 1,760,000.00 F.11 Pemasangan 1 Buah Engsel Jendela
- Rp 2,021,066.00 Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Engsel Jendela (Stainless Eks.Otis 3" x 2,5")

No Uraian Pekerjaan
1 2
F.12 Pemasangan 1 Buah Kunci Tanam
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kunci Tanam (Eks. Ses Art 2030 40mm SS)

No Uraian Pekerjaan
1 2
F.13 Pemasangan 1 Buah Kunci Tanam Kamar Mandi
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kunci Tanam

No Uraian Pekerjaan
1 2
F.15 Pemasangan 1 Buah Kait Angin
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kait Angin

No Uraian Pekerjaan
1 2
F.16 Pemasangan 1 m2 Garasi Besi (Rolling Door)
Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Pintu Besi Henderson

No Uraian Pekerjaan
1 2
F.14 Pemasangan 1 Buah Pegangan Pintu
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Pegangan Pintu (BLC AAH 8 SS)

NO URUTAN PEKERJAAN
1 2
KEBUTUHAN BAHAN DAN TENAGA KERJA PE

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
PEKERJAAN PINTU D
ngan 1 m3 Kusen Pintu dan Jendela Kayu Kelas II 0.393 - m3
6 Oh
18 Oh
1.8 Oh
0.3 Oh
marinda 1.2 m3
1.25 Kg
1 Kg

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
ngan 1 m Kusen Alumunium 167.938 - m
0.043 Oh
nium 0.043 Oh
s Alumunium 0.0043 Oh
0.0021 Oh
1.1 m
2 Buah
0.06 Tube

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
ngan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Kelas II 19.57925 - m2
0.85 Oh
2.55 Oh
0.255 Oh
0.043 Oh
0.025 m3
0.8 Kg
0.03 Kg
x 220 mm 1 Lbr
0.5 Lbr
Uraian Pekerjaan Vol Koef Satuan
2 3 4 5
un Pintu Alumunium P3 1 - Unit
0.44 Oh
nium 0.44 Oh
s Alumunium 0.044 Oh
0.022 Oh
m 1 Buah
1 Set
1 Set
AH8 SS) 1 Pasang

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
un Pintu PJ2 1 - Unit
0.44 Oh
nium 0.44 Oh
s Alumunium 0.044 Oh
0.022 Oh
m 2 Buah
2 Set
1 Set
2 Pasang

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
un Jendela Alumunium 19 - Unit
0.44 Oh
nium 0.44 Oh
s Alumunium 0.044 Oh
0.022 Oh
um 1 Buah
2 Set
1 1
0.06 Tube
1 ls
Uraian Pekerjaan Vol Koef Satuan
2 3 4 5
u Besi 1.72 - m2
0.65 Oh
0.65 Oh
0.065 Oh
0.032 Oh
es 1.5 m2

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
s Block 2 - Buah
0.015 Oh
0.15 Oh
0.015 Oh
0.0008 Oh
1 Buah

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
Polos Tebal 5 mm 25.563 - m2
0.015 Oh
0.15 Oh
0.015 Oh
0.0008 Oh
Asahi 1.1 m2
0.05 Kg

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
gsel Pintu 48 - Buah
0.015 Oh
0.15 Oh
0.015 Oh
0.0008 Oh
Eks.Otis 4"x3") 1 Buah

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
gsel Jendela 36 - Buah
0.015 Oh
0.15 Oh
0.015 Oh
0.0008 Oh
ss Eks.Otis 3" x 2,5") 1 Buah

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
unci Tanam 29 - Buah
0.01 Oh
0.5 Oh
0.05 Oh
0.005 Oh
s Art 2030 40mm SS) 1 Buah

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
unci Tanam Kamar Mandi 4 - Buah
0.005 Oh
0.5 Oh
0.005 Oh
0.0025 Oh
1 Buah

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
it Angin 18 - Buah
0.015 Oh
0.15 Oh
0.015 Oh
0.008 Oh
1 Buah

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
si Besi (Rolling Door) 12.036 - m2
1.2 Oh
1.2 Oh
0.12 Oh
0.006 Oh
1.1 m2

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
gangan Pintu 14
0.05 Oh
0.5 Oh
0.05 Oh
0.003 Oh
AAH 8 SS) 1 Buah

HARGA SATUAN JUMLAH HARGA


VOL SAT
UPAH BAHAN UPAH
3 4 5 6 7 = (3x5)
N TENAGA KERJA PEKERJAAN PINTU DAN JENDELA

Harga Satuan (Rp) Jumlah yang Dibutuhkan


Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
PEKERJAAN PINTU DAN JENDELA

Rp 95,600.00 - - 2.358 - -
Rp 109,300.00 - - 7.074 - -
Rp 120,000.00 - - 0.7074 - -
Rp 131,000.00 - - 0.1179 - -
- Rp 8,500,000.00 - - 0.4716 -
- Rp 15,000.00 - - 0.49125 -
- Rp 15,000.00 - - 0.393 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 7.221334 - -
Rp 109,300.00 - - 7.221334 - -
Rp 120,000.00 - - 0.7221334 - -
Rp 131,000.00 - - 0.3526698 - -
- Rp 117,500.00 - - 184.7318 -
- Rp 283.33 - - 335.876 -
- Rp 25,000.00 - - 10.07628 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 16.6423608 - -
Rp 109,300.00 - - 49.9270824 - -
Rp 120,000.00 - - 4.99270824 - -
Rp 131,000.00 - - 0.841907664 - -
- Rp 9,000,000.00 - - 0.4894812 -
- Rp 15,000.00 - 15.6633984 -
- Rp 25,000.00 - - 0.58737744 -
- Rp 120,000.00 - - 19.579248 -
- Rp 26,400.00 - - 9.789624 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 0.44 - -
Rp 109,300.00 - - 0.44 - -
Rp 120,000.00 - - 0.044 - -
Rp 131,000.00 - - 0.022 - -
- Rp 1,100,000.00 - - 1 -
- Rp 55,000.00 - - 1 -
- Rp 225,000.00 - - 1 -
- Rp 200,000.00 - - 1 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 0.44 - -
Rp 109,300.00 - - 0.44 - -
Rp 120,000.00 - - 0.044 - -
Rp 131,000.00 - - 0.022 - -
- Rp 1,800,000.00 - - 2 -
- Rp 55,000.00 - - 2 -
- Rp 225,000.00 - - 1 -
- Rp 200,000.00 - - 2 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 8.36 - -
Rp 109,300.00 - - 8.36 - -
Rp 120,000.00 - - 0.836 - -
Rp 131,000.00 - - 0.418 - -
- Rp 600,000.00 - - 19 -
- Rp 45,000.00 - - 38 -
- Rp 25,000.00 - - 19 -
- Rp 25,000.00 - - 1.14 -
- Rp 50,000.00 - - 19 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 1.118 - -
Rp 109,300.00 - - 1.118 - -
Rp 120,000.00 - - 0.1118 - -
Rp 131,000.00 - - 0.05504 - -
- Rp 642,000.00 - - 2.58 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 0.03 - -
Rp 109,300.00 - - 0.3 - -
Rp 120,000.00 - - 0.03 - -
Rp 131,000.00 - - 0.0016 - -
- Rp 20,000.00 - - 2 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 0.383445165 - -
Rp 109,300.00 - - 3.83445165 - -
Rp 120,000.00 - - 0.383445165 - -
Rp 131,000.00 - - 0.0204504088 - -
- Rp 116,600.00 - - 28.1193121 -
- Rp 25,000.00 - - 1.27815055 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 0.72 - -
Rp 109,300.00 - - 7.2 - -
Rp 120,000.00 - - 0.72 - -
Rp 131,000.00 - - 0.0384 - -
- Rp 41,500.00 - - 48 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 0.54 - -
Rp 109,300.00 - - 5.4 - -
Rp 120,000.00 - - 0.54 - -
Rp 131,000.00 - - 0.0288 - -
- Rp 35,000.00 - - 36 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 0.29 -
Rp 109,300.00 - - 14.5 -
Rp 120,000.00 - - 1.45 -
Rp 131,000.00 - - 0.145 -
- Rp 210,000.00 - - 29
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 0.02 - -
Rp 109,300.00 - - 2 - -
Rp 120,000.00 - - 0.02 - -
Rp 131,000.00 - - 0.01 - -
- Rp 33,000.00 - - 4 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 0.27 - -
Rp 109,300.00 - - 2.7 - -
Rp 120,000.00 - - 0.27 - -
Rp 131,000.00 - - 0.144 - -
- Rp 25,000.00 - - 18 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 14.4432 - -
Rp 109,300.00 - - 14.4432 - -
Rp 120,000.00 - - 1.44432 - -
Rp 131,000.00 - - 0.072216 - -
- Rp 1,600,000.00 - - 13.2396 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 0.7 - -
Rp 109,300.00 - - 7 - -
Rp 120,000.00 - - 0.7 - -
Rp 131,000.00 - - 0.042 - -
- Rp 200,000.00 - - 14 -
Jumlah
Total

JUMLAH HARGA TOTAL HARGA


BAHAN (UPAH+BAHAN)
8 = (3x6) 9 = (7+8)
Harga Material (Rp) Type Kusen Pintu/Jend
Upah Bahan Alat
P1
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
P2
Rp 225,424.80 - -
P2*
Rp 773,188.20 - -
Rp 84,888.00 - -
P4
Rp 15,444.90 - -
- Rp 4,008,600.00 -
- Rp 7,368.75 -
- Rp 5,895.00 -
Rp 1,098,945.90 Rp 4,021,863.75 -
Rp 5,120,809.65
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 690,359.53 - -
Rp 789,291.81 - -
Rp 86,656.01 - -
Rp 46,199.74 - -
- Rp 21,705,986.50 -
- Rp 95,163.75 -
- Rp 251,907.00 -
Rp 1,612,507.09 Rp 22,053,057.25 -
Rp 23,665,564.34
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 1,591,009.69 - -
Rp 5,457,030.11 - -
Rp 599,124.99 - -
Rp 110,289.90 - -
- Rp 4,405,330.80 -
- Rp 234,950.98 -
- Rp 14,684.44 -
- Rp 2,349,509.76 -
- Rp 258,446.07 -
Rp 7,757,454.69 Rp 7,262,922.05 -
Rp 15,020,376.74
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 42,064.00 - -
Rp 48,092.00 - -
Rp 5,280.00 - -
Rp 2,882.00 - -
- Rp 1,100,000.00 -
- Rp 55,000.00 -
- Rp 225,000.00 -
- Rp 200,000.00 -
Rp 98,318.00 Rp 1,580,000.00 -
Rp 1,678,318.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 42,064.00 - -
Rp 48,092.00 - -
Rp 5,280.00 - -
Rp 2,882.00 - -
- Rp 3,600,000.00 -
- Rp 110,000.00 -
- Rp 225,000.00 -
- Rp 400,000.00 -
Rp 98,318.00 Rp 4,335,000.00 -
Rp 4,433,318.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 799,216.00 - -
Rp 913,748.00 - -
Rp 100,320.00 - -
Rp 54,758.00 - -
- Rp 11,400,000.00 -
- Rp 1,710,000.00 -
- Rp 475,000.00 -
- Rp 28,500.00 -
- Rp 950,000.00 -
Rp 1,868,042.00 Rp 14,563,500.00 -
Rp 16,431,542.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 106,880.80 - -
Rp 122,197.40 - -
Rp 13,416.00 - -
Rp 7,210.24 - -
- Rp 1,656,360.00 -
Rp 249,704.44 Rp 1,656,360.00 -
Rp 1,906,064.44
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 2,868.00 - -
Rp 32,790.00 - -
Rp 3,600.00 - -
Rp 209.60 - -
- Rp 40,000.00 -
Rp 39,467.60 Rp 40,000.00 -
Rp 79,467.60
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 36,657.36 - -
Rp 419,105.57 - -
Rp 46,013.42 - -
Rp 2,679.00 - -
- Rp 3,278,711.79 -
- Rp 31,953.76 -
Rp 504,455.35 Rp 3,310,665.55 -
Rp 3,815,120.90
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 68,832.00 - -
Rp 786,960.00 - -
Rp 86,400.00 - -
Rp 5,030.40 - -
- Rp 1,992,000.00 -
Rp 947,222.40 Rp 1,992,000.00 -
Rp 2,939,222.40
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 51,624.00 - -
Rp 590,220.00 - -
Rp 64,800.00 - -
Rp 3,772.80 - -
- Rp 1,260,000.00 -
Rp 710,416.80 Rp 1,260,000.00 -
Rp 1,970,416.80
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 27,724.00 - -
Rp 1,584,850.00 - -
Rp 174,000.00 - -
Rp 18,995.00 - -
- Rp 6,090,000.00 -
Rp 1,805,569.00 Rp 6,090,000.00 -
Rp 7,895,569.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 1,912.00 - -
Rp 218,600.00 - -
Rp 2,400.00 - -
Rp 1,310.00 - -
- Rp 132,000.00 -
Rp 224,222.00 Rp 132,000.00 -
Rp 356,222.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 25,812.00 - -
Rp 295,110.00 - -
Rp 32,400.00 - -
Rp 18,864.00 - -
- Rp 450,000.00 -
Rp 372,186.00 Rp 450,000.00 -
Rp 822,186.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 1,380,769.92 - -
Rp 1,578,641.76 - -
Rp 173,318.40 - -
Rp 9,460.30 - -
- Rp 21,183,360.00 -
Rp 3,142,190.38 Rp 21,183,360.00 -
Rp 24,325,550.38
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 66,920.00 - -
Rp 765,100.00 - -
Rp 84,000.00 - -
Rp 5,502.00 - -
- Rp 2,800,000.00 -
Rp 921,522.00 Rp 2,800,000.00 -
Rp 3,721,522.00
Type Kusen Pintu/Jendela Panjang (m) Jumlah Luas Penampang Kusen (5/15)
Ambang Pintu 0.9 2 0.0075
Tiang Pintu 2.45 2 0.0075
Ambang Pintu 0.8 1 0.0075
Tiang Pintu 2.15 2 0.0075
Ambang Pintu 0.8 1 0.0075
Tiang Pintu 2.15 2 0.0075
Ambang Pintu 0.9 1 0.0075
Tiang Pintu 2.15 2 0.0075
TOTAL VOLUME KUSEN KAYU (m3)
PER

Volume (m3) Jumlah Type (Buah) Total Volume (m3) Type Kusen Pintu/Jendela
0.0135
4 0.201 PJ 3
0.0368
0.0060
3 0.115 P3
0.0323
0.0060
1 0.038 J1
0.0323
0.0068
1 0.039 J2
0.0323
0.393 J3

J4

J5

BV

J7

PJ 2

PJ 4

TOTAL VOLUME KUSE


PERHITUNGAN VOLUME PEKERJAAN PINTU DAN JENDELA

Type Kusen Pintu/Jendela Panjang (m) Jumlah Type (Buah) Volume (m')
Ambang Pintu 3.15
1 9.632
Tiang Pintu 6.482
Ambang Pintu 1.8
1 6.8
Tiang Pintu 5
Ambang Pintu 4.05
7 54.25
Tiang Pintu 3.7
Ambang Pintu 2.4
1 10
Tiang Pintu 7.6
Ambang Pintu 3.9
1 18.72
Tiang Pintu 4.8
Ambang Pintu 2.1
1 5.5
Tiang Pintu 3.4
Ambang Pintu 10.5
1 15.6
Tiang Pintu 5.1
Ambang Pintu 0.6
1 1.2
Tiang Pintu 0.6
Ambang Pintu 0.9
4 13.736
Tiang Pintu 2.534
Ambang Pintu 6.5
1 15.7
Tiang Pintu 9.2
Ambang Pintu 9
1 16.8
Tiang Pintu 7.8
TOTAL VOLUME KUSEN ALUMUNIUM (m') 167.938

No
1
2
3
4
5
6
7
8
9
Total Vo

No
1
2
3
4
5
6
7
8
9
10
11

Total Volu

No
1
2
3
4
5
6
7
8
9
Total
TU DAN JENDELA

No Type Pintu Panjang (m) Tinggi (m)


1 P1 0.8 2.1
2 P2 0.7 2.1
3 P2* 0.7 2.1
4 PJ4 1.4 2.1
5 PJ3 0.8 2.1
6 P4 0.8 2.1
TOTAL VOLUME PINTU KAYU (m2)

No Jumlah (bh) No
PJ 2 1 PJ 2
PJ 3 1 PJ 3
PJ4 1 PJ4
J1 7 J1
J2 1 J2
J3 1 J3
J4 1 J4
J5 1 J5
BV 1 J7
J7 4 Total
Total 19

Tipe Pintu Panjang (m) Tinggi (m) Jumlah


PB 0.8 2.15 1

Type Pintu Jumlah Engsel Jumlah Type Kusen Total Volume (buah)
P1 3 4 12
P2 3 3 9
P2* 3 1 3
P3 3 1 3
P4 3 1 3
PJ2 6 1 6
PJ3 3 1 3
PJ4 6 1 6
PB 3 1 3
Total Volume Engsel Pintu (Buah) 48

Type Kusen Jumlah Kunci Tanam Jumlah Type Kusen Total Volume (buah)
P1 1 4 4
P3 1 1 1
P4 1 1 1
PJ2 1 1 1
PJ3 2 1 2
PJ4 1 1 1
PB 1 1 1
J1 2 7 14
J3 2 1 2
J4 1 1 1
J5 1 1 1
Total Volume Kunci Tanam (Buah) 29

Type Kusen Jumlah Pegangan Pintu


P1 4
P2 3
P2* 1
P3 1
P4 1
PJ2 1
PJ3 1
PJ4 1
PB 1
Total 14
Jumlah Volume (m2) No Panjang Kaca (m)
4 6.7200 P1 0.8
3 4.4100 0.54
1 1.4700 0.448
PJ2
1 2.9400 0.448
1 2.3592 0.675
1 1.6800 0.6
PJ3 0.8
19.579
0.476
P3 0.8
0.45
Jumlah (bh) PJ4 0.45
1 0.675
1 0.476
J1
1 0.6
7 J2 0.5
1 0.451
J3
1 0.575
1 0.6
J4
1 0.476
4 0.467
18 0.6
J5
1.18
1.18
BV 0.376
0.2
J7
0.2
TOTAL VOLUME KACA (m2)

Volume (m2)
1.72

No Type Jendela Jumlah Engsel Jumlah Type Kusen


1 J1 4 7
2 J2 - -
3 J3 4 1
4 J4 2 1
5 J5 2 1
6 J7 - -
Total Volume Engsel Jendela (Buah)

No Type Kusen Jumlah Kunci Tanam Jumlah Type Kusen


1 P2 1 3
2 P2* 1 1
Total Volume Kunci Tanam (Buah)

Tipe Pintu Panjang (m) Tinggi (m) Jumlah


Pintu Garasi 5.1 2.36 1
Tinggi Kaca (m) Jumlah (buah) Volume (m2)
NO
0.25 4 0.800
1.82 2 1.966 1
1.85 2 1.658 F.1
0.25 2 0.224 F.2
0.25 2 0.338 F.3
0.25 1 0.150 F.4
0.25 1 0.200 F.5
0.926 1 0.441 F.6
0.25 1 0.200 F.7
0.45 8 1.620 F.8
0.25 2 0.225 F.9
0.25 2 0.338 F.10
1.126 2 7.504 F.11
0.25 2 2.100 F.12
1.2 3 1.800 F.13
1.73 2 1.560 F.14
0.25 2 0.288 F.15
0.25 2 0.300 F.16
1.126 1 0.536
1.117 1 0.522
0.25 1 0.150 No
0.25 1 0.295 1
0.383 3 1.356 1
0.376 1 0.141 2
0.25 4 0.200 3
0.817 4 0.654 4
5
L VOLUME KACA (m2) 25.563
6
7
8

No
1
1
2
3
4
Total Volume (buah) 5
28 6
- 7
4 8
2 9
2 10
- 11
12
36
13
14
15
16
17
Total Volume (buah) 18
3 19
1 20
21
4
22
23
24
25
Volume (m2) 26
12.036 27
28
29
30
URUTAN PEKERJAAN
2
Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Jendela Kayu Kelas II
Pembuatan dan Pemasangan 1 m Kusen Alumunium
Pembuatan dan Pemasangan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Kelas II
Pemasangan 1 Unit Daun Pintu Alumunium P3
Pemasangan 1 Unit Daun Pintu PJ2
Pemasangan 1 Unit Daun Jendela Alumunium
Pemasangan 1 m2 Pintu Besi
Pemangan 1 Buah Glass Block
Pemangan 1 m2 Kaca Polos Tebal 5 mm
Pemasangan 1 Unit Engsel Pintu
Pemasangan 1 Buah Engsel Jendela
Pemasangan 1 Buah Kunci Tanam
Pemasangan 1 Buah Kunci Tanam Kamar Mandi
Pemasangan 1 Buah Pegangan Pintu
Pemasangan 1 Buah Kait Angin
Pemasangan 1 m2 Garasi Besi (Rolling Door)
Total Anggaran Biaya

Tenaga Kerja
2
Pekerja
Tukang Kayu
Tukang Khusus Alumunium
Tukang Besi
Kepala Tukang Kayu
Kepala Tukang Khusus Alumunium
Kepala Tukang Besi
Mandor
Total

Bahan
2
Balok Kayu Kamper Samarinda
Paku 10 cm
Lem Kayu
Profil Alumunium
Skrup Fixer
Sealant
Kayu Papan Samarinda
Paku 1" - 2,5"
Teakwood, t = 4mm , 90 x 220 mm
Plat Seng Alumumium
Daun Pintu Alumunium PJ2
Daun Pintu Alumunium P3
Engsel Pintu + Baut
Kunci Pintu
Handle Tarik (BLC AAH8 SS)
Handle Tarik
Daun Jendela Alumunium
Engsel Jendela
Slot Jendela
Accessories
Pintu Besi + Accessories
Glass Block
Kaca Polos Tebal 5mm Asahi
Engsel Pintu (Stainless Eks.Otis 4"x3")
Engsel Jendela (Stainless Eks.Otis 3" x 2,5")
Kunci Tanam (Eks. Ses Art 2030 40mm SS)
Kunci Tanam
Pegangan Pintu (BLC AAH 8 SS)
Kait Angin
Pintu Besi Henderson
Total
HARGA SATUAN
VOL SAT
UPAH BAHAN
3 4 5 6
0.393 m3 Rp 2,796,300.00 Rp 10,233,750.00
167.938 m Rp 9,601.80 Rp 131,316.66
19.579 m2 Rp 396,208.00 Rp 370,950.00
1.000 Buah Rp 98,318.00 Rp 1,580,000.00
1.000 Buah Rp 98,318.00 Rp 4,335,000.00
19.000 Buah Rp 98,318.00 Rp 766,500.00
1.720 m2 Rp 145,177.00 Rp 963,000.00
2.000 Buah Rp 19,733.80 Rp 20,000.00
25.563 m2 Rp 19,733.80 Rp 129,510.00
48.000 Buah Rp 19,733.80 Rp 41,500.00
36.000 Buah Rp 19,733.80 Rp 35,000.00
29.000 Buah Rp 62,261.00 Rp 210,000.00
4.000 Buah Rp 56,055.50 Rp 33,000.00
14.000 Buah Rp 65,823.00 Rp 200,000.00
18.000 Buah Rp 20,677.00 Rp 25,000.00
12.036 m2 Rp 261,066.00 Rp 1,760,000.00
n Biaya

Satuan Jumlah Kebutuhan Harga Satuan (Rp)


3 4 5
Oh 53.9763 Rp 95,600.00
Oh 99.9355 Rp 109,300.00
Oh 16.4613 Rp 109,300.00
Oh 15.5612 Rp 109,300.00
Oh 9.8136 Rp 120,000.00
Oh 1.6461 Rp 120,000.00
Oh 1.5561 Rp 120,000.00
Oh 2.3320 Rp 131,000.00

Satuan Jumlah Kebutuhan Harga Satuan (Rp)


3 4 5
m3 0.47160 Rp 8,500,000.00
Kg 0.49125 Rp 15,000.00
Kg 16.05640 Rp 15,000.00
m 184.73180 Rp 117,500.00
Buah 335.87600 Rp 283.33
Tube 12.49443 Rp 25,000.00
m3 0.48948 Rp 9,000,000.00
Kg 0.58738 Rp 25,000.00
Lbr 19.57925 Rp 120,000.00
Lbr 9.78962 Rp 26,400.00
Buah 2.00000 Rp 1,800,000.00
Buah 1.00000 Rp 1,100,000.00
Set 3.00000 Rp 55,000.00
Set 2.00000 Rp 225,000.00
Pasang 1.00000 Rp 200,000.00
Buah 2.00000 Rp 200,000.00
Set 19.00000 Rp 600,000.00
Set 38.00000 Rp 45,000.00
Pasang 19.00000 Rp 25,000.00
ls 19.00000 Rp 50,000.00
m2 2.58000 Rp 642,000.00
Buah 2.00000 Rp 20,000.00
m2 28.11931 Rp 116,600.00
Buah 48.00000 Rp 41,500.00
Buah 36.00000 Rp 35,000.00
Buah 29.00000 Rp 210,000.00
Buah 4.00000 Rp 33,000.00
Buah 14.00000 Rp 200,000.00
Buah 18.00000 Rp 25,000.00
m2 13.23960 Rp 1,600,000.00
JUMLAH HARGA TOTAL HARGA
UPAH BAHAN (UPAH+BAHAN)
7 = (3x5) 8 = (3x6) 9 = (7+8)
Rp 1,098,945.90 Rp 4,021,863.75 Rp 5,120,809.65
Rp 1,612,507.09 Rp 22,053,057.25 Rp 23,665,564.34
Rp 7,757,454.69 Rp 7,262,922.05 Rp 15,020,376.74
Rp 98,318.00 Rp 1,580,000.00 Rp 1,678,318.00
Rp 98,318.00 Rp 4,335,000.00 Rp 4,433,318.00
Rp 1,868,042.00 Rp 14,563,500.00 Rp 16,431,542.00
Rp 249,704.44 Rp 1,656,360.00 Rp 1,906,064.44
Rp 39,467.60 Rp 40,000.00 Rp 79,467.60
Rp 504,455.35 Rp 3,310,665.55 Rp 3,815,120.90
Rp 947,222.40 Rp 1,992,000.00 Rp 2,939,222.40
Rp 710,416.80 Rp 1,260,000.00 Rp 1,970,416.80
Rp 1,805,569.00 Rp 6,090,000.00 Rp 7,895,569.00
Rp 224,222.00 Rp 132,000.00 Rp 356,222.00
Rp 921,522.00 Rp 2,800,000.00 Rp 3,721,522.00
Rp 372,186.00 Rp 450,000.00 Rp 822,186.00
Rp 3,142,190.38 Rp 21,183,360.00 Rp 24,325,550.38
Rp 21,450,541.64 Rp 92,730,728.60 Rp 114,181,270.24

Biaya Upah
6 = (4 x 5)
Rp 5,160,138.10
Rp 10,922,953.87
Rp 1,799,223.81
Rp 1,700,839.16
Rp 1,177,626.41
Rp 197,536.01
Rp 186,734.40
Rp 305,489.89
Rp 21,450,541.64

Biaya Bahan
6 = (4 x 5)
Rp 4,008,600.00
Rp 7,368.75
Rp 240,845.98
Rp 21,705,986.50
Rp 95,163.75
Rp 312,360.76
Rp 4,405,330.80
Rp 14,684.44
Rp 2,349,509.76
Rp 258,446.07
Rp 3,600,000.00
Rp 1,100,000.00
Rp 165,000.00
Rp 450,000.00
Rp 200,000.00
Rp 400,000.00
Rp 11,400,000.00
Rp 1,710,000.00
Rp 475,000.00
Rp 950,000.00
Rp 1,656,360.00
Rp 40,000.00
Rp 3,278,711.79
Rp 1,992,000.00
Rp 1,260,000.00
Rp 6,090,000.00
Rp 132,000.00
Rp 2,800,000.00
Rp 450,000.00
Rp 21,183,360.00
Rp 92,730,728.60
ANALISA HARGA SATUAN

NO URAIAN KOEF SAT


1 2 3 4
G PEKERJ
G.1 1 m3 Urugan Pasir Tebal 5 cm

Pekerja 0.15 Oh
Mandor 0.01 Oh
Pasir Urug 1.2 m3
JUMLAH
G.2 1 m3 Membuat Beton Tumbuk 1 PC : 3 PS : 5 KRL

Pekerja 1.65 Oh
Tukang Batu 0.25 Oh
Kepala Tukang Batu 0.025 Oh
Mandor 0.08 Oh
Semen Portland 218 Kg
Pasir Beton 0.52 m3
Koral Beton 0.87 m3
JUMLAH
G.3 1 m3 Urugan Tanah Peninggian Lantai

Pekerja 0.25 Oh
Mandor 0.025 Oh
Tanah Urug 1.2 m3
JUMLAH
G.4 Pemasangan 1 m2 Lantai Gracewood (Costul Dev Uk. 12 x 102 x 900 mm)

Pekerja 0.7 Oh
Tukang Kayu 0.35 Oh
Kepala Tukang Kayu 0.035 Oh
Mandor 0.035 Oh
Grace Wood (Costul Dev Uk. 12 x 102 x 900 mm) 1.05 m2
Lem Kayu 0.6 Kg
JUMLAH
G.5 Pemasangan 1 m2 Keramik 50 x 50 Roman Polos

Pekerja 0.7 Oh
Tukang Batu 0.35 Oh
Kepala Tukang Batu 0.035 Oh
Mandor 0.035 Oh
Keramik Uk. 50x50 Roman Polos (Golongan A) 1.05 Dus (Isi 4)
Semen Portland 7.5 Kg
Semen Warna 0.5 Kg
Pasir Pasang 0.045 m3
JUMLAH
G.6 Pemasangan 1 m2 Lantai Keramik 33,3 x 33,3 Roman Polos

Pekerja 0.7 Oh
Tukang Batu 0.35 Oh
Kepala Tukang Batu 0.035 Oh
Mandor 0.035 Oh
Keramik Uk. 33,3 x 33,3 Roman Polos (Golongan A) 1.05 Dus (Isi 9)
Semen Portland 8.19 Kg
Semen Warna 0.5 Kg
Pasir Pasang 0.045 m3
JUMLAH
G.7 Pemasangan 1 m2 Lantai Keramik 30 x 30 Roman Polos

Pekerja 0.7 Oh
Tukang Batu 0.35 Oh
Kepala Tukang Batu 0.035 Oh
Mandor 0.035 Oh
Keramik Uk. 30 x 30 Roman Polos (Golongan B) 1.05 Dus (isi 11)
Semen Portland 10 Kg
Semen Warna 0.5 Kg
Pasir Pasang 0.045 m3
JUMLAH
G.8 Pemasangan 1 m2 Lantai Keramik 20 x 20 Roman Polos

Pekerja 0.7 Oh
Tukang Batu 0.35 Oh
Kepala Tukang Batu 0.035 Oh
Mandor 0.035 Oh
Keramik Uk. 20 x 20 Roman Polos (Golongan A) 1.05 Dus (isi 25)
Semen Portland 10.4 Kg
Semen Warna 0.5 Kg
Pasir Pasang 0.045 m3
JUMLAH
G.9 Pemasangan 1 m2 Lantai Keramik Uk. 10 cm x 33 cm Roman Polos Untuk Border

Pekerja 1.05 Oh
Tukang Batu 0.525 Oh
Kepala Tukang Batu 0.053 Oh
Mandor 0.053 Oh
Keramik Uk. 10 x 33 Roman Polos 33 Bh
Semen Portland 9.8 Kg
Semen Warna 4.37 Kg
Pasir Pasang 0.045 m3
JUMLAH
G.10 Pemasangan 1 m' Plint Kayu Tebal 2 cm Lebar 10 cm

Pekerja 0.12 Oh
Tukang Kayu 0.12 Oh
Kepala Tukang Kayu 0.012 Oh
Mandor 0.006 Oh
Kayu Papan Borneo Super 0.003 m3
Paku 5 cm - 7 cm 0.05 Kg
JUMLAH
G.11 Pemasangan 1 m2 Paving Block Berwarna Tebal 6 cm (Ubin Set 21x21x6)

Pekerja 0.25 Oh
Tukang Batu 0.5 Oh
Kepala Tukang Batu 0.05 Oh
Mandor 0.0013 Oh
Paving Block Berwarna Tebal 6 cm (21x21x6) 1.01 m2
Pasir Beton 0.05 m3
JUMLAH
G.12 Pemasangan 1 m2 Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6)

Pekerja 0.25 Oh
Tukang Batu 0.5 Oh
Kepala Tukang Batu 0.05 Oh
Mandor 0.0013 Oh
Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6) 1.01 m2
Pasir Beton 0.05 m3
JUMLAH
HARGA SATUAN PEKERJAAN LANTAI

Harga Satuan (Rp) Jumlah Harga (Rp)


Upah Bahan Alat Upah Bahan Alat
5 6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)
PEKERJAAN LANTAI

Rp 95,600.00 - - Rp 14,340.00 - -
Rp 131,000.00 - - Rp 1,310.00 - -
- Rp 224,500.00 - - Rp 269,400.00 -
Rp 15,650.00 Rp 269,400.00 -

Rp 95,600.00 - - Rp 157,740.00 - -
Rp 109,300.00 - - Rp 27,325.00 - -
Rp 120,000.00 - - Rp 3,000.00 - -
Rp 131,000.00 - - Rp 10,480.00 - -
- Rp 1,100.00 - - Rp 239,800.00 -
- Rp 250,000.00 - - Rp 130,000.00 -
- Rp 148,100.00 - - Rp 128,847.00 -
Rp 198,545.00 Rp 498,647.00 -

Rp 95,600.00 - - Rp 23,900.00 -
Rp 131,000.00 - - Rp 3,275.00 -
- Rp 50,000.00 - - Rp 60,000.00
Rp 27,175.00 Rp 60,000.00 -

Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 325,000.00 - - Rp 341,250.00 -
- Rp 15,000.00 - - Rp 9,000.00 -
Rp 113,960.00 Rp 350,250.00 -

Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 123,500.00 - - Rp 129,675.00 -
- Rp 1,100.00 - - Rp 8,250.00 -
- Rp 15,000.00 - - Rp 7,500.00 -
- Rp 224,500.00 - - Rp 10,102.50 -
Rp 113,960.00 Rp 155,527.50 -

Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 97,000.00 - - Rp 101,850.00 -
- Rp 1,100.00 - - Rp 9,009.00 -
- Rp 15,000.00 - - Rp 7,500.00 -
- Rp 224,500.00 - - Rp 10,102.50 -
Rp 113,960.00 Rp 128,461.50 -

Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 87,000.00 - - Rp 91,350.00 -
- Rp 1,100.00 - - Rp 11,000.00 -
- Rp 15,000.00 - - Rp 7,500.00 -
- Rp 224,500.00 - - Rp 10,102.50 -
Rp 113,960.00 Rp 119,952.50 -

Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 87,000.00 - - Rp 91,350.00 -
- Rp 1,100.00 - - Rp 11,440.00 -
- Rp 15,000.00 - - Rp 7,500.00 -
- Rp 224,500.00 - - Rp 10,102.50 -
Rp 113,960.00 Rp 120,392.50 -
order

Rp 95,600.00 - - Rp 100,380.00 - -
Rp 109,300.00 - - Rp 57,382.50 - -
Rp 120,000.00 - - Rp 6,360.00 - -
Rp 131,000.00 - - Rp 6,943.00 - -
- Rp 11,000.00 - - Rp 363,000.00 -
- Rp 1,100.00 - - Rp 10,780.00 -
- Rp 15,000.00 - - Rp 65,550.00 -
- Rp 224,500.00 - - Rp 10,102.50 -
Rp 171,065.50 Rp 449,432.50 -

Rp 95,600.00 - - Rp 11,472.00 - -
Rp 109,300.00 - - Rp 13,116.00 - -
Rp 120,000.00 - - Rp 1,440.00 - -
Rp 131,000.00 - - Rp 786.00 - -
- Rp 5,500,000.00 - - Rp 16,500.00 -
- Rp 16,000.00 - - Rp 800.00 -
Rp 26,814.00 Rp 17,300.00 -

Rp 95,600.00 - - Rp 23,900.00 - -
Rp 109,300.00 - - Rp 54,650.00 - -
Rp 120,000.00 - - Rp 6,000.00 - -
Rp 131,000.00 - - Rp 170.30 - -
- Rp 110,000.00 - - Rp 111,100.00 -
- Rp 250,000.00 - - Rp 12,500.00 -
Rp 84,720.30 Rp 123,600.00 -

Rp 95,600.00 - - Rp 23,900.00 - -
Rp 109,300.00 - - Rp 54,650.00 - -
Rp 120,000.00 - - Rp 6,000.00 - -
Rp 131,000.00 - - Rp 170.30 - -
- Rp 80,000.00 - - Rp 80,800.00 -
- Rp 250,000.00 - - Rp 12,500.00 -
Rp 84,720.30 Rp 93,300.00 -
Jumlah (Rp) No Uraian Pekerjaan
11 = ( 8+9+10) 1 2
G
G.1 1 m3 Urugan Pasir Tebal 5 cm
Pekerja
Rp 14,340.00 Mandor
Rp 1,310.00 Pasir Urug
Rp 269,400.00
Rp 285,050.00
No Uraian Pekerjaan
Rp 157,740.00 1 2
Rp 27,325.00 G.2 1 m3 Membuat Beton Tumbuk 1 PC : 3 PS : 5 KRL
Rp 3,000.00 Pekerja
Rp 10,480.00 Tukang Batu
Rp 239,800.00 Kepala Tukang Batu
Rp 130,000.00 Mandor
Rp 128,847.00 Semen Portland
Rp 697,192.00 Pasir Beton
Koral Beton

Rp 23,900.00
Rp 3,275.00
No Uraian Pekerjaan
Rp 60,000.00
Rp 87,175.00 1 2
G.3 1 m3 Urugan Tanah Peninggian Lantai
Pekerja
Rp 66,920.00 Mandor
Rp 38,255.00 Tanah Urug
Rp 4,200.00
Rp 4,585.00
Rp 341,250.00
No Uraian Pekerjaan
Rp 9,000.00
Rp 464,210.00 1 2
G.4 Pemasangan 1 m2 Lantai Gracewood (Costul Dev Uk. 12 x 102 x 900 mm)
Pekerja
Rp 66,920.00 Tukang Kayu
Rp 38,255.00 Kepala Tukang Kayu
Rp 4,200.00 Mandor
Rp 4,585.00 Grace Wood (Costul Dev Uk. 12 x 102 x 900 mm)
Rp 129,675.00 Lem Kayu
Rp 8,250.00
Rp 7,500.00
Rp 10,102.50
No Uraian Pekerjaan
Rp 269,487.50
1 2
G.5 Pemasangan 1 m2 Keramik 50 x 50 Roman Polos
Rp 66,920.00 Pekerja
Rp 38,255.00 Tukang Batu
Rp 4,200.00 Kepala Tukang Batu
Rp 4,585.00 Mandor
Rp 101,850.00 Keramik Uk. 50x50 Roman Polos (Golongan A)
Rp 9,009.00 Semen Portland
Rp 7,500.00 Semen Warna
Rp 10,102.50 Pasir Pasang
Rp 242,421.50

No Uraian Pekerjaan
Rp 66,920.00
Rp 38,255.00 1 2
Rp 4,200.00 G.6 Pemasangan 1 m2 Lantai Keramik 33,3 x 33,3 Roman Polos
Rp 4,585.00 Pekerja
Rp 91,350.00 Tukang Batu
Rp 11,000.00 Kepala Tukang Batu
Rp 7,500.00 Mandor
Rp 10,102.50 Keramik Uk. 33,3 x 33,3 Roman Polos (Golongan A)
Rp 233,912.50 Semen Portland
Semen Warna
Pasir Pasang
Rp 66,920.00
Rp 38,255.00
Rp 4,200.00
No Uraian Pekerjaan
Rp 4,585.00
Rp 91,350.00 1 2
Rp 11,440.00 G.7 Pemasangan 1 m2 Lantai Keramik 30 x 30 Roman Polos
Rp 7,500.00 Pekerja
Rp 10,102.50 Tukang Batu
Rp 234,352.50 Kepala Tukang Batu
Mandor
Keramik Uk. 30 x 30 Roman Polos (Golongan B)
Rp 100,380.00 Semen Portland
Rp 57,382.50 Semen Warna
Rp 6,360.00 Pasir Pasang
Rp 6,943.00
Rp 363,000.00
Rp 10,780.00
No Uraian Pekerjaan
Rp 65,550.00
Rp 10,102.50 1 2
Rp 620,498.00 G.8 Pemasangan 1 m2 Lantai Keramik 20 x 20 Roman Polos
Pekerja
Tukang Batu
Rp 11,472.00 Kepala Tukang Batu
Rp 13,116.00 Mandor
Rp 1,440.00 Keramik Uk. 20 x 20 Roman Polos (Golongan A)
Rp 786.00 Semen Portland
Rp 16,500.00 Semen Warna
Rp 800.00 Pasir Pasang
Rp 44,114.00

No Uraian Pekerjaan
Rp 23,900.00
Rp 54,650.00 1 2
Rp 6,000.00 G.9 Pemasangan 1 m2 Lantai Keramik Uk. 10 cm x 33 cm Roman Polos Untuk Bo
Rp 170.30 Pekerja
Rp 111,100.00 Tukang Batu
Rp 12,500.00 Kepala Tukang Batu
Rp 208,320.30 Mandor
Keramik Uk. 10 x 33 Roman Polos
Semen Portland
Rp 23,900.00 Semen Warna
Rp 54,650.00 Pasir Pasang
Rp 6,000.00
Rp 170.30
Rp 80,800.00
No Uraian Pekerjaan
Rp 12,500.00
Rp 178,020.30 1 2
G.10 Pemasangan 1 m' Plint Kayu Tebal 2 cm Lebar 10 cm
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Papan Borneo Super
Paku 5 cm - 7 cm
No Uraian Pekerjaan
1 2
G.11 Pemasangan 1 m2 Paving Block Berwarna Tebal 6 cm (Ubin Set 21x21x6)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Paving Block Berwarna Tebal 6 cm (21x21x6)
Pasir Beton

No Uraian Pekerjaan
1 2
G.12 Pemasangan 1 m2 Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6)
Pasir Beton
KEBUTUHAN BAHAN DAN TENAG

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
PEKERJAAN LANTAI
l 5 cm 1.270 - m3
0.15 Oh
0.01 Oh
1.2 m3

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
umbuk 1 PC : 3 PS : 5 KRL 1.651 - m3
1.65 Oh
0.25 Oh
0.025 Oh
0.08 Oh
218 Kg
0.52 m3
0.87 m3

Uraian Pekerjaan Vol Koef Satuan

2 3 4 5
inggian Lantai 30.48 - m3
0.25 Oh
0.025 Oh
1.2 m3

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
i Gracewood (Costul Dev Uk. 12 x 102 x 900 mm) 97.720 - m2
0.7 Oh
0.35 Oh
0.035 Oh
0.035 Oh
Uk. 12 x 102 x 900 mm) 1.05 m2
0.6 Kg

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
mik 50 x 50 Roman Polos 123.970 - m2
0.7 Oh
0.35 Oh
0.035 Oh
0.035 Oh
an Polos (Golongan A) 1.05 Dus (Isi 4)
7.5 Kg
0.5 Kg
0.045 m3

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
i Keramik 33,3 x 33,3 Roman Polos 36.208 - m2
0.7 Oh
0.35 Oh
0.035 Oh
0.035 Oh
Roman Polos (Golongan A) 1.05 Dus (Isi 9)
8.19 Kg
0.5 Kg
0.045 m3

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
i Keramik 30 x 30 Roman Polos 30.355 - m2
0.7 Oh
0.35 Oh
0.035 Oh
0.035 Oh
man Polos (Golongan B) 1.05 Dus (isi 11)
10 Kg
0.5 Kg
0.045 m3

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
i Keramik 20 x 20 Roman Polos 34.101 - m2
0.7 Oh
0.35 Oh
0.035 Oh
0.035 Oh
man Polos (Golongan A) 1.05 Dus (isi 25)
10.4 Kg
0.5 Kg
0.045 m3

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
i Keramik Uk. 10 cm x 33 cm Roman Polos Untuk Border 4.004 - m2
1.05 Oh
0.525 Oh
0.053 Oh
0.053 Oh
man Polos 33 Bh
9.8 Kg
4.37 Kg
0.045 m3

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
Kayu Tebal 2 cm Lebar 10 cm 119.850 - m'
0.12 Oh
0.12 Oh
0.012 Oh
0.006 Oh
r 0.003 m3
0.05 Kg
Uraian Pekerjaan Vol Koef Satuan
2 3 4 5
g Block Berwarna Tebal 6 cm (Ubin Set 21x21x6) 21.344 - m2
0.25 Oh
0.5 Oh
0.05 Oh
0.0013 Oh
ebal 6 cm (21x21x6) 1.01 m2
0.05 m3

Uraian Pekerjaan Vol Koef Satuan


2 3 4 5
g Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6) 4.057 - m2
0.25 Oh
0.5 Oh
0.05 Oh
0.0013 Oh
ebal 6 cm (Uk. Bata 10,5x21x6) 1.01 m2
0.05 m3
HAN BAHAN DAN TENAGA KERJA

Harga Satuan (Rp) Jumlah yang Dibutuhkan


Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
PEKERJAAN LANTAI

Rp 95,600.00 - - 0.190512 - -
Rp 131,000.00 - - 0.0127008 - -
- Rp 224,500.00 - - 1.524096 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 2.7243216 - -
Rp 109,300.00 - - 0.412776 - -
Rp 120,000.00 - - 0.0412776 - -
Rp 131,000.00 - - 0.13208832 - -
- Rp 1,100.00 - - 359.940672 -
- Rp 250,000.00 - - 0.85857408 -
- Rp 148,100.00 - - 1.43646048 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 7.61965875 - -
Rp 131,000.00 - - 0.761965875 - -
- Rp 50,000.00 - - 36.574362 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 68.404 - -
Rp 109,300.00 - - 34.202 - -
Rp 120,000.00 - - 3.4202 - -
Rp 131,000.00 - - 3.4202 - -
- Rp 325,000.00 - - 102.606 -
- Rp 15,000.00 - - 58.632 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 86.77921 - -
Rp 109,300.00 - - 43.389605 - -
Rp 120,000.00 - - 4.3389605 - -
Rp 131,000.00 - - 4.3389605 - -
- Rp 123,500.00 - - 130.168815 -
- Rp 1,100.00 - - 929.77725 -
- Rp 15,000.00 - - 61.98515 -
- Rp 224,500.00 - - 5.5786635 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 25.34567 - -
Rp 109,300.00 - - 12.672835 - -
Rp 120,000.00 - - 1.2672835 - -
Rp 131,000.00 - - 1.2672835 - -
- Rp 97,000.00 - - 38.018505 -
- Rp 1,100.00 - - 296.544339 -
- Rp 15,000.00 - - 18.10405 -
- Rp 224,500.00 - - 1.6293645 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 21.24864 - -
Rp 109,300.00 - - 10.62432 - -
Rp 120,000.00 - - 1.062432 - -
Rp 131,000.00 - - 1.062432 - -
- Rp 87,000.00 - - 31.87296 -
- Rp 1,100.00 - - 303.552 -
- Rp 15,000.00 - - 15.1776 -
- Rp 224,500.00 - 1.365984 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 23.8707 - -
Rp 109,300.00 - - 11.93535 - -
Rp 120,000.00 - - 1.193535 - -
Rp 131,000.00 - - 1.193535 - -
- Rp 87,000.00 - - 35.80605 -
- Rp 1,100.00 - - 354.6504 -
- Rp 15,000.00 - - 17.0505 -
- Rp 224,500.00 - - 1.534545 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 4.20441 - -
Rp 109,300.00 - - 2.102205 - -
Rp 120,000.00 - - 0.2122226 - -
Rp 131,000.00 - - 0.2122226 - -
- Rp 11,000.00 - - 132.1386 -
- Rp 1,100.00 - - 39.24116 -
- Rp 15,000.00 - - 17.498354 -
- Rp 224,500.00 - - 0.180189 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 14.382 - -
Rp 109,300.00 - - 14.382 - -
Rp 120,000.00 - - 1.4382 - -
Rp 131,000.00 - - 0.7191 - -
- Rp 5,500,000.00 - - 0.35955 -
- Rp 16,000.00 - - 5.9925 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 5.3361 - -
Rp 109,300.00 - - 10.6722 - -
Rp 120,000.00 - - 1.06722 - -
Rp 131,000.00 - - 0.02774772 - -
- Rp 110,000.00 - - 21.557844 -
- Rp 250,000.00 - - 1.06722 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 1.0143 - -
Rp 109,300.00 - - 2.0286 - -
Rp 120,000.00 - - 0.20286 - -
Rp 131,000.00 - - 0.00527436 - -
- Rp 80,000.00 - - 4.097772 -
- Rp 250,000.00 - - 0.20286 -
Jumlah
Total
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 18,212.95 - -
Rp 1,663.80 - -
- Rp 342,159.55 -
Rp 19,876.75 Rp 342,159.55 -
Rp 362,036.30
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 260,445.14 - -
Rp 45,116.42 - -
Rp 4,953.31 - -
Rp 17,303.57 - -
- Rp 395,934.74 -
- Rp 214,643.52 -
- Rp 212,739.80 -
Rp 327,818.44 Rp 823,318.06 -
Rp 1,151,136.50
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 728,439.38 - -
Rp 99,817.53 - -
- Rp 1,828,718.10 -
Rp 828,256.91 Rp 1,828,718.10 -
Rp 2,656,975.01
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 6,539,422.40 - -
Rp 3,738,278.60 - -
Rp 410,424.00 - -
Rp 448,046.20 - -
- Rp 33,346,950.00 -
- Rp 879,480.00 -
Rp 11,136,171.20 Rp 34,226,430.00 -
Rp 45,362,601.20
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 8,296,092.48 - -
Rp 4,742,483.83 - -
Rp 520,675.26 - -
Rp 568,403.83 - -
- Rp 16,075,848.65 -
- Rp 1,022,754.98 -
- Rp 929,777.25 -
- Rp 1,252,409.96 -
Rp 14,127,655.39 Rp 19,280,790.83 -
Rp 33,408,446.22
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 2,423,046.05 - -
Rp 1,385,140.87 - -
Rp 152,074.02 - -
Rp 166,014.14 - -
- Rp 3,687,794.99 -
- Rp 326,198.77 -
- Rp 271,560.75 -
- Rp 365,792.33 -
Rp 4,126,275.08 Rp 4,651,346.84 -
Rp 8,777,621.91
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 2,031,369.98 - -
Rp 1,161,238.18 - -
Rp 127,491.84 - -
Rp 139,178.59 - -
- Rp 2,772,947.52 -
- Rp 333,907.20 -
- Rp 227,664.00 -
- Rp 306,663.41 -
Rp 3,459,278.59 Rp 3,641,182.13 -
Rp 7,100,460.72
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 2,282,038.92 - -
Rp 1,304,533.76 - -
Rp 143,224.20 - -
Rp 156,353.09 - -
- Rp 3,115,126.35 -
- Rp 390,115.44 -
- Rp 255,757.50 -
- Rp 344,505.35 -
Rp 3,886,149.96 Rp 4,105,504.64 -
Rp 7,991,654.60
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 401,941.60 - -
Rp 229,771.01 - -
Rp 25,466.71 - -
Rp 27,801.16 - -
- Rp 1,453,524.60 -
- Rp 43,165.28 -
- Rp 262,475.31 -
- Rp 40,452.43 -
Rp 684,980.48 Rp 1,799,617.62 -
Rp 2,484,598.09
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 1,374,919.20 - -
Rp 1,571,952.60 - -
Rp 172,584.00 - -
Rp 94,202.10 - -
- Rp 1,977,525.00 -
- Rp 95,880.00 -
Rp 3,213,657.90 Rp 2,073,405.00 -
Rp 5,287,062.90
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 510,131.16 - -
Rp 1,166,471.46 - -
Rp 128,066.40 - -
Rp 3,634.95 - -
- Rp 2,371,362.84 -
- Rp 266,805.00 -
Rp 1,808,303.97 Rp 2,638,167.84 -
Rp 4,446,471.81
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 96,967.08 - -
Rp 221,725.98 - -
Rp 24,343.20 - -
Rp 690.94 - -
- Rp 327,821.76 -
- Rp 50,715.00 -
Rp 343,727.20 Rp 378,536.76 -
Rp 722,263.96
Gambar Perhitungan Volume Urugan Pa
Panjang
Lebar
Tebal/Tinggi
Luas
Volume

Perhitungan Volume Urugan Tanah


Peninggian 5 cm
Nama Ruangan
As Horizontal
Teras C1'-D1'
KM/WC 1 C'4 - D'4
Teras Halaman Belakang B7-E7
KM/WC Pembantu A8-B8
KM/WC 2 E9-G9
Teras A7-B7
Balkon (Lt2) B'1' - D1'
Balkon (Lt2) B'1-C1
KM/WC (Lt2) A3-C3
Total Luas (m2)
Total Volume (m3)

Perhitungan Volume Urugan Tanah


Peninggian 10 cm
Nama Ruangan
As Horizontal
Ruang Cuci (Lt1) A7'-B7'
Total Luas (m2)
Total Volume (m3)

Perhitungan Volume Urugan Tanah


Peninggian 90 cm
Nama Ruangan
Nama Ruangan
As Horizontal
Garasi A2-C2
Total Luas (m2)
Total Volume (m3)

Gambar Perhitungan Volume Paving Block Berwarna Tebal 6


Panjang
Lebar
Luas

Gambar Perhitungan Volume Paving Block Berwarna Tebal 6 c


Luas Carport (m2)
Panjang
Lebar
Luas Carport (m2)
Luas Paving Block Ubin 21x21x6
Panjang
Lebar
Luas Paving Block Ubin (m2)
Luas Paving Block Uk Bata (10,5x
Luas Carport (m2)
Luas Paving Block Ubin (m2)
Luas Paving Block Bata (m2)
PERHITU

hitungan Volume Urugan Pasir Gambar


= 5.04 m
= 5.04 m
= 0.05 m
= 25.4016 m2
= 1.27008 m3

Tanah
Peninggian 5 cm
Panjang (m) As Vertikal Panjang (m) Luas (m2)
2.8 1'C - 3C 3.432 9.610
1.5 4C'-5C' 1.67 2.505
6.715 7'B-8'B 0.9 6.044
2 8A-9A 1.2 2.400
4 9E-10E 2 8.000
3.085 7A-8A 6.8 20.978
3.917 A1'-A1 1 3.917
0.917 B'1-B'3 2 1.834
5.4 3A-4A 2.2 11.880
67.167
3.358

Tanah
Peninggian 10 cm
Panjang (m) As Vertikal Panjang (m) Luas (m2)
1.774 7'A-8'A 2.2 3.903
3.903
0.390

Tanah
Peninggian 90 cm
Panjang (m) As Vertikal Panjang (m) Luas (m2)
5.4 2A-5A 5.5 29.700
29.700
26.730

ing Block Berwarna Tebal 6 cm (Ubin Set 21x21x6)


= 4.62 m
= 4.62 m
= 21.34 m2

ng Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6 )


Luas Carport (m2)
= 5.04 m
= 5.04 m
= 25.40 m2
Paving Block Ubin 21x21x6 (m2)
= 4.62 m
= 4.62 m
= 21.34 m2
aving Block Uk Bata (10,5x21x6)
= 25.40 m2
= 21.34 m2
= 4.06 m2
PERHITUNGAN VOLUME PEKERJAAN LANTAI

Perhitungan Volume Struktur Perkerasan


Panjang = 5.04 m
Lebar = 5.04 m
Tebal/Tinggi = 0.065 m
Luas = 25.4016 m2
Volume = 1.651104 m3

Perhitungan Volume Pemasangan Lantai Gracewood


Nama Ruangan As Horizontal Panjang (m) As vertikal Panjang (m) Luas (m2)
Ruang Tidur Utama (lt1) E7-G7 4 7E-9E 8 32
2 Ruang Tidur (Lt 2 ) C5-G5 8.6 5C-7C 4 34.4
Ruang Tidur (Lt2) A4-C4 5.4 4A-7A 5.8 31.32
Total Luas (m2) 97.72

Perhitungan Volume Pemasangan Lantai Keramik 50x50 Roman (LT1)


As Horizontal Panjang (m) As vertikal Panjang (m) Luas (m2)
B5-G5 10.85 5B-7B 4 43.400
D1-F1 3.4 1D-5D 4.7 15.980
F1-G1 2.2 1F-4F 4.2 9.240
C3-D3 3 3C-4C 2.2 6.600
A6-B6 3.15 6B-7B 3 6.840
C'5-D5 0.9 4'C'-5C' 1.167 1.050
Total Luas (m2) 83.110

Perhitungan Volume Pemasangan Lantai Keramik 50x50 Roman (LT2)


As Horizontal Panjang (m) As vertikal Panjang (m) Luas (m2)
C4-G4 8.6 4C-5C 1.8 15.480
C2-F2 6.4 2C-4C 3.7 23.680
D1-F1 3.4 1C-2C 0.5 1.700
Total Luas (m2) 40.860
Perhitungan Volume Pemasangan Lantai Keramik 33,3x33,3 Roman
Nama Ruangan Panjang (m) Lebar (m) Luas (m2)
Teras Depan (Lt1) 3.1 2.47 7.657
Teras Belakang (Lt1) 6.715 0.9 6.044
Balkon (Lt2 ) 3.52 0.8 2.816
Balkon (Lt2 ) 1.365 0.52 0.710
KM/WC (Lt1) (-0,05) 4 2 8.000
KM/WC (Lt2) (+3.73) 1 3.15 2.2 6.930
KM/WC (Lt2) (+3.73) 2 2.25 1.168 2.628
KM/WC (Lt2) (+3.73) 2 1.582 0.9 1.424
Total Luas (m2) 36.208

Perhitungan Volume Pemasanan Lantai Keramik 30x30 Roman Polos


Nama Ruangan As Horizontal Panjang (m) As Vertikal Panjang (m) Luas (m2)
A2-C2 5.4 2A-5A 5.5 29.700
Garasi
C4-C'4 0.364 4C'-5C' 1.8 0.655
Total Luas (m2) 30.355
Perhitungan Volume Pemasangan Lantai Keramik 20x20 Roman Polos
As Horizontal Panjang (m) As vertikal Panjang (m)
A7-B7 3.15 7A-10A 10
C'4-D'4 1.445 4C'-5C' 1.8
Total Luas (m2)

Perhitungan Volume Lantai Keramik 10 x 33 untuk border


Luas Teras Depan (m2) Luas Lantai Keramik 33,3 x 33,3 Pada Teras (m2)
9.611 7.657

Perhitungan Volume Lantai Keramik 10 x 33 untuk border


Luas Balkon (m2) Luas Lantai Keramik 33,3 x 33,3 Pada Balkon (m2)
5.576 3.526

Perhitungan Volume Pemasangan Plint Lantai Kayu (LT1)


As Horizontal Panjang (m) As vertikal Panjang (m)
F1-G1 2.2 2A-5A 5.5
E1-F1 1.8 2A-4A 3.7
B5-D5 5.25 2F-4F 3.7
B5-C5 2.25 2G-7G 9.5
E7-G7 * 3.1 7G-9G 8
B7-E7 * 5.4 7E-9E 5.4
E9-G9 * 3.2 9A-10A 2
9B-10B 1.4
Total Panjang (m') 23.2 Total Panjang (m') 39.2

Total Volume Plint Lt 1 (m') 62.4


an Polos
Luas (m2)
31.500
2.601
34.101

10 x 33 untuk border
Luas Lantai Keramik 10 x 33
1.954

10 x 33 untuk border
Luas Lantai Keramik 10 x 33
2.050

Perhitungan Volume Pemasangan Plint Lantai Kayu (LT2)


As Horizontal Panjang (m) As vertikal Panjang (m)
D1-F1 3.4 1G-2'G 1.3
2(C5-35) * 7.4 4G-5G 1.8
E5-G5 * 3.1 5G-7G 4
E7-G7 4 1F-4F 4.2
D5-E5 1.6 2(5E-7E) 8
B4-C'4 1.65 2'C-3C 0.85
A7-C7 5.4 4C-5C * 0.95
2(5C-7C) 4
4A-7A 5.8
Total Panjang (m') 26.55 Total Panjang (m') 30.9
Total Volume Plint Lt 2 (m') 57.45
RENCANA ANGG

NO
1
G.1
G.2
G.3
G.4
G.5
G.6
G.7
G.8
G.9
G.10
G.11
G.12
Total Anggaran Biaya

No
1
1
2
3
4
5
6
Total

No
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Total
RENCANA ANGGARAN BIAYA

URUTAN PEKERJAAN
2
Pekerjaan 1 m3 Urugan Pasir Tebal 5 cm
Pekerjaan 1 m3 Pembuatan Beton Tumbuk 1 PC : 3 PS : 5 KRL
Pekerjaan 1m3 Urugan Tanah Peninggian Lantai
Pekerjaan Pemasangan 1 m2 Lantai Gracewood (Costal Dev Uk. 12 x 102 x 900 mm)
Pekerjaan Pemasangan 1m2 Lantai Keramik 50 x 50 Roman Polos
Pekerjaan Pemasangan 1m2 Lantai Keramik 33,3 x 33,3 Roman Polos
Pekerjaan Pemasangan 1m2 Lantai Keramik 30 x 30 Roman Polos
Pekerjaan Pemasangan 1m2 Lantai Keramik 20x20 Roman Polos
Pekerjaan Pemasangan 1m2 Lantai Keramik 10 x 30 Roman Polos Untuk Border
Pekerjaan Pemasangan 1m' Plint Kayu Tebal 2 cm Lebar 10 cm
Pekerjaan Pemasangan 1m2 Paving Block Berwarna Tebal 6 cm ( Ubin Set 21x21x6)
Pekerjaan Pemasangan 1m2 Paving Block Berwarna Tebal 6cm (Uk. Bata 10,5x21x6)
Total Anggaran Biaya

Tenaga Kerja
2
Pekerja
Tukang Batu
Tukang Kayu
Kepala Tukang Batu
Kepala Tukang Kayu
Mandor
Total

Bahan
2
Pasir Urug
Semen Portland
Pasir Beton
Koral Beton
Tanah Urug
Grace Wood (Costul Dev Uk. 12 x 102 x 900 mm)
Lem Kayu
Keramik Ukuran 50x50 Roman Polos (Golongan A)
Keramik Ukuran 33,3 x 33,3 Roman Polos (Golongan A)
Keramik Ukuran 30 x 30 Roman Polos (Golongan B)
Keramik Ukuran 20 x 20 Roman Polos (Golongan A)
Keramik Ukuran 10 x 33 Roman Polos Untuk Border
Semen Warna
Pasir Pasang
Kayu Papan Borneo Super
Paku 5 cm - 7 cm
Paving Block Berwarna Tebal 6 cm (Ubin Set 21x21x6)
Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6)
Total
CANA ANGGARAN BIAYA PEKERJAAN LANTAI

HARGA SATUAN JUMLAH HARGA


VOL SAT
UPAH BAHAN UPAH
3 4 5 6 7 = (3x5)
1.270 m3 Rp 15,650.00 Rp 269,400.00 Rp 19,876.75
1.651 m3 Rp 198,545.00 Rp 498,647.00 Rp 327,818.44
30.479 m3 Rp 27,175.00 Rp 60,000.00 Rp 828,256.91
97.720 m2 Rp 113,960.00 Rp 350,250.00 Rp 11,136,171.20
123.970 m2 Rp 113,960.00 Rp 155,527.50 Rp 14,127,655.39
36.208 m2 Rp 113,960.00 Rp 128,461.50 Rp 4,126,275.08
30.355 m2 Rp 113,960.00 Rp 119,952.50 Rp 3,459,278.59
34.101 m2 Rp 113,960.00 Rp 120,392.50 Rp 3,886,149.96
4.004 m2 Rp 171,065.50 Rp 449,432.50 Rp 684,980.48
119.850 m' Rp 26,814.00 Rp 17,300.00 Rp 3,213,657.90
21.344 m2 Rp 84,720.30 Rp 123,600.00 Rp 1,808,303.97
4.057 m2 Rp 84,720.30 Rp 93,300.00 Rp 343,727.20
Biaya Rp 43,962,151.87

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah


3 4 5 6 = (4 x 5)
Oh 261.120 Rp 95,600.00 Rp 24,963,026.34
Oh 93.838 Rp 109,300.00 Rp 10,256,481.49
Oh 48.584 Rp 109,300.00 Rp 5,310,231.20
Oh 9.386 Rp 120,000.00 Rp 1,126,294.94
Oh 4.858 Rp 120,000.00 Rp 583,008.00
Oh 13.154 Rp 131,000.00 Rp 1,723,109.90
Rp 43,962,151.87

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Bahan


3 4 5 6 = (4 x 5)
m3 1.524 Rp 224,500.00 Rp 342,159.55
Kg 2283.706 Rp 1,100.00 Rp 2,512,076.40
m3 2.129 Rp 250,000.00 Rp 532,163.52
m3 1.436 Rp 148,100.00 Rp 212,739.80
m3 36.574 Rp 50,000.00 Rp 1,828,718.10
m2 102.606 Rp 325,000.00 Rp 33,346,950.00
Kg 58.632 Rp 15,000.00 Rp 879,480.00
Dus (isi 4) 130.169 Rp 123,500.00 Rp 16,075,848.65
Dus (Isi 9) 38.019 Rp 97,000.00 Rp 3,687,794.99
Dus (11) 31.873 Rp 87,000.00 Rp 2,772,947.52
Dus (25) 35.806 Rp 87,000.00 Rp 3,115,126.35
Buah 132.139 Rp 11,000.00 Rp 1,453,524.60
Kg 129.816 Rp 15,000.00 Rp 1,947,234.81
m3 10.289 Rp 224,500.00 Rp 2,309,823.48
m3 0.360 Rp 5,500,000.00 Rp 1,977,525.00
Kg 5.993 Rp 16,000.00 Rp 95,880.00
m2 21.558 Rp 110,000.00 Rp 2,371,362.84
m2 4.098 Rp 80,000.00 Rp 327,821.76
Rp 75,789,177.37
JUMLAH HARGA TOTAL HARGA
BAHAN (UPAH+BAHAN)
8 = (3x6) 9 = (7+8)
Rp 342,159.55 Rp 362,036.30
Rp 823,318.06 Rp 1,151,136.50
Rp 1,828,718.10 Rp 2,656,975.01
Rp 34,226,430.00 Rp 45,362,601.20
Rp 19,280,790.83 Rp 33,408,446.22
Rp 4,651,346.84 Rp 8,777,621.91
Rp 3,641,182.13 Rp 7,100,460.72
Rp 4,105,504.64 Rp 7,991,654.60
Rp 1,799,617.62 Rp 2,484,598.09
Rp 2,073,405.00 Rp 5,287,062.90
Rp 2,638,167.84 Rp 4,446,471.81
Rp 378,536.76 Rp 722,263.96
Rp 75,789,177.37 Rp 119,751,329.23
ANALISA HARGA SATUAN PEKE

Harga Satuan (Rp)


NO URAIAN KOEF SAT
Upah
1 2 3 4 5
H PEKERJAAN ATA
H.1 Pemasangan 1 m3 Konstruksi Kuda-Kuda Kayu Kelas II

Pekerja 4 Oh Rp 95,600.00
Tukang Kayu 12 Oh Rp 109,300.00
Kepala Tukang Kayu 1.2 Oh Rp 120,000.00
Mandor 0.2 Oh Rp 131,000.00
Balok Kayu Borneo Kelas II 1.1 m3 -
Besi Strip Tebal 5 mm 15 Kg -
Paku 12 cm 5.6 Kg -
JUMLAH
H.2 Pemasangan 1 m3 Konstruksi Gording Kayu Kelas II

Pekerja 6.7 Oh Rp 95,600.00


Tukang Kayu 20.1 Oh Rp 109,300.00
Kepala Tukang Kayu 2.01 Oh Rp 120,000.00
Mandor 0.335 Oh Rp 131,000.00
Balok Kayu Borneo Kelas II 1.1 m3 -
Besi Strip Tebal 5 mm 15 Kg -
Paku 12 cm 3 Kg -
JUMLAH
H.3 Pemasangan 1 m2 Rangka Atap Genting Kanmuri Kayu Kelas II

Pekerja 0.1 Oh Rp 95,600.00


Tukang Kayu 0.1 Oh Rp 109,300.00
Kepala Tukang Kayu 0.01 Oh Rp 120,000.00
Mandor 0.005 Oh Rp 131,000.00
Kaso-Kaso (5x7) cm 0.014 m3 -
Reng (3x4) cm 0.057 m3 -
Paku 5-7 cm 0.25 Kg -
JUMLAH
H.4 Pemasangan 1m' Lisplank Ukuran (3x20) cm Kayu Kelas II

Pekerja 0.1 Oh Rp 95,600.00


Tukang Kayu 0.2 Oh Rp 109,300.00
Kepala Tukang Kayu 0.02 Oh Rp 120,000.00
Mandor 0.005 Oh Rp 131,000.00
Papan Kayu Borneo Super 0.0108 m3 -
Paku 5-7 cm 0.1 Kg -
JUMLAH
H.5 Pemasangan 1 m2 Penutup Atap Genting Kanmuri

Pekerja 0.2 Oh Rp 95,600.00


Tukang Kayu 0.1 Oh Rp 109,300.00
Kepala Tukang Kayu 0.01 Oh Rp 120,000.00
Mandor 0.01 Oh Rp 131,000.00
Genting Kanmuri Milenio 11 Buah -
Paku 5-7 cm 0.03 Kg -
JUMLAH
ALISA HARGA SATUAN PEKERJAAN ATAP

Harga Satuan (Rp) Jumlah Harga (Rp)


Bahan Alat Upah Bahan Alat
6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)
PEKERJAAN ATAP

- - Rp 382,400.00 - -
- - Rp 1,311,600.00 - -
- - Rp 144,000.00 - -
- - Rp 26,200.00 - -
Rp 4,750,000.00 - - Rp 5,225,000.00 -
Rp 32,000.00 - - Rp 480,000.00 -
Rp 15,000.00 - - Rp 84,000.00 -
Rp 1,864,200.00 Rp 5,789,000.00 -

- - Rp 640,520.00 - -
- - Rp 2,196,930.00 - -
- - Rp 241,200.00 - -
- - Rp 43,885.00 - -
Rp 4,750,000.00 - - Rp 5,225,000.00 -
Rp 32,000.00 - - Rp 480,000.00 -
Rp 15,000.00 - - Rp 45,000.00 -
Rp 3,122,535.00 Rp 5,750,000.00 -
las II

- - Rp 9,560.00 - -
- - Rp 10,930.00 - -
- - Rp 1,200.00 - -
- - Rp 655.00 - -
Rp 3,500,000.00 - - Rp 49,000.00 -
Rp 3,000,000.00 - - Rp 171,000.00 -
Rp 16,000.00 - - Rp 4,000.00 -
Rp 22,345.00 Rp 224,000.00 -

- - Rp 9,560.00 - -
- - Rp 21,860.00 - -
- - Rp 2,400.00 - -
- - Rp 655.00 - -
Rp 5,500,000.00 - - Rp 59,400.00 -
Rp 16,000.00 - - Rp 1,600.00 -
Rp 34,475.00 Rp 61,000.00 -

- - Rp 19,120.00 - -
- - Rp 10,930.00 - -
- - Rp 1,200.00 - -
- - Rp 1,310.00 - -
Rp 11,200.00 - - Rp 123,200.00 -
Rp 16,000.00 - - Rp 480.00 -
Rp 32,560.00 Rp 123,680.00 -
Jumlah (Rp) No Uraian Pekerjaan
11 = ( 8+9+10) 1 2
H
H.1 Pemasangan 1 m3 Konstruksi Kuda-Kuda Kayu Kelas II
Pekerja
Rp 382,400.00 Tukang Kayu
Rp 1,311,600.00 Kepala Tukang Kayu
Rp 144,000.00 Mandor
Rp 26,200.00 Balok Kayu Borneo Kelas II
Rp 5,225,000.00 Besi Strip Tebal 5 mm
Rp 480,000.00 Paku 12 cm
Rp 84,000.00
Rp 7,653,200.00
No Uraian Pekerjaan
Rp 640,520.00 1 2
Rp 2,196,930.00 H.2 Pemasangan 1 m3 Konstruksi Gording Kayu Kelas II
Rp 241,200.00 Pekerja
Rp 43,885.00 Tukang Kayu
Rp 5,225,000.00 Kepala Tukang Kayu
Rp 480,000.00 Mandor
Rp 45,000.00 Balok Kayu Borneo Kelas II
Rp 8,872,535.00 Besi Strip Tebal 5 mm
Paku 12 cm

Rp 9,560.00
Rp 10,930.00
No Uraian Pekerjaan
Rp 1,200.00
Rp 655.00 1 2
Rp 49,000.00 H.3 Pemasangan 1 m2 Rangka Atap Genting Kanmuri Kayu Kelas II
Rp 171,000.00 Pekerja
Rp 4,000.00 Tukang Kayu
Rp 246,345.00 Kepala Tukang Kayu
Mandor
Kaso-Kaso (5x7) cm
Rp 9,560.00 Reng (3x4) cm
Rp 21,860.00 Paku 5-7 cm
Rp 2,400.00
Rp 655.00
Rp 59,400.00
No Uraian Pekerjaan
Rp 1,600.00
Rp 95,475.00 1 2
H.4 Pemasangan 1m' Listplank Ukuran (3x20) cm Kayu Kelas II
Pekerja
Rp 19,120.00 Tukang Kayu
Rp 10,930.00 Kepala Tukang Kayu
Rp 1,200.00 Mandor
Rp 1,310.00 Papan Kayu Borneo Super
Rp 123,200.00 Paku 5-7 cm
Rp 480.00
Rp 156,240.00
No Uraian Pekerjaan
1 2
H.5 Pemasangan 1 m2 Penutup Atap Genting Kanmuri
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Genting Kanmuri Milenio
Paku 5-7 cm
REKAPITULASI KEBUTUHAN TENAGA KERJA DAN BAHAN

Harga Satuan (Rp)


Uraian Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
PEKERJAAN ATAP
si Kuda-Kuda Kayu Kelas II 1.6247 - m3
4 Oh Rp 95,600.00 -
12 Oh Rp 109,300.00 -
1.2 Oh Rp 120,000.00 -
0.2 Oh Rp 131,000.00 -
II 1.1 m3 - Rp 4,750,000.00
15 Kg - Rp 32,000.00
5.6 Kg - Rp 15,000.00

Harga Satuan (Rp)


Uraian Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
si Gording Kayu Kelas II 1.7282 - m3
6.7 Oh Rp 95,600.00 -
20.1 Oh Rp 109,300.00 -
2.01 Oh Rp 120,000.00 -
0.335 Oh Rp 131,000.00 -
II 1.1 m3 - Rp 4,750,000.00
15 Kg - Rp 32,000.00
3 Kg - Rp 15,000.00

Harga Satuan (Rp)


Uraian Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
Atap Genting Kanmuri Kayu Kelas II 171.344 - m2
0.1 Oh Rp 95,600.00 -
0.1 Oh Rp 109,300.00 -
0.01 Oh Rp 120,000.00 -
0.005 Oh Rp 131,000.00 -
0.014 m3 - Rp 3,500,000.00
0.057 m3 - Rp 3,000,000.00
0.25 Kg - Rp 16,000.00
Harga Satuan (Rp)
Uraian Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
Ukuran (3x20) cm Kayu Kelas II 57.579 - m'
0.1 Oh Rp 95,600.00 -
0.2 Oh Rp 109,300.00 -
0.02 Oh Rp 120,000.00 -
0.005 Oh Rp 131,000.00 -
0.0108 m3 - Rp 5,500,000.00
0.1 Kg - Rp 16,000.00

Harga Satuan (Rp)


Uraian Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
Atap Genting Kanmuri 171.344 - m2
0.2 Oh Rp 95,600.00 -
0.1 Oh Rp 109,300.00 -
0.01 Oh Rp 120,000.00 -
0.01 Oh Rp 131,000.00 -
11 Buah - Rp 11,200.00
0.03 Kg - Rp 16,000.00
ERJA DAN BAHAN PEKERJAAN ATAP

n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)


Alat Upah Bahan Alat Upah
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)
JAAN ATAP

- 6.4989261499 - - Rp 621,297.34
- 19.4967784497 - - Rp 2,130,997.88
- 1.949677845 - - Rp 233,961.34
- 0.3249463075 - - Rp 42,567.97
- - 1.7872046912 - -
- - 24.3709730621 - -
- - 9.0984966098 - -
Jumlah Rp 3,028,824.53
Total Rp 12,434,
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

- 11.5788864 - - Rp 1,106,941.54
- 34.7366592 - - Rp 3,796,716.85
- 3.47366592 - - Rp 416,839.91
- 0.57894432 - - Rp 75,841.71
- - 1.9010112 - -
- - 25.92288 - -
- - 5.184576 - -
Jumlah Rp 5,396,340.01
Total Rp 15,333,
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

- 17.1343911 - - Rp 1,638,047.79
- 17.1343911 - - Rp 1,872,788.95
- 1.71343911 - - Rp 205,612.69
- 0.856719555 - - Rp 112,230.26
- - 2.398814754 - -
- - 9.766602927 - -
- - 42.83597775 - -
Jumlah Rp 3,828,679.69
Total Rp 42,209,
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

- 5.7579 - - Rp 550,455.24
- 11.5158 - - Rp 1,258,676.94
- 1.15158 - - Rp 138,189.60
- 0.287895 - - Rp 37,714.25
- - 0.6218532 - -
- - 5.7579 - -
Jumlah Rp 1,985,036.03
Total Rp 5,497,
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

- 34.2687822 - - Rp 3,276,095.58
- 17.1343911 - - Rp 1,872,788.95
- 1.71343911 - - Rp 205,612.69
- 1.71343911 - - Rp 224,460.52
- - 1884.783021 - -
- - 5.14031733 - -
Jumlah Rp 5,578,957.74
Total Rp 26,770,
Harga Material (Rp) KUDA-KUDA 1
Bahan Alat Kemiringan = 30.000
13 = (7 x 10) 14 = (8 x 11) Balok Tarik = 6.400
Kaki Kuda-Kuda = 3.695
Tiang Kuda-Kuda = 1.847
- - Balok Sokong = 1.555
- - Balok Gapit 1 = 0.659
- - Balok Gapit 2 = 1.252
- - Balok Nok = 3.600
Rp 8,489,222.28 -
Rp 779,871.14 -
Rp 136,477.45 -
Rp 9,405,570.87 -
12,434,395.40
Harga Material (Rp) KUDA-KUDA 2
Bahan Alat Kemiringan = 30.000
13 = (7 x 10) 14 = (8 x 11) Balok Tarik = 2.650
Kaki Kuda-Kuda = 3.060
- - Tiang Kuda-Kuda = 1.530
- - Balok Sokong = 1.376
- - Balok Gapit 1 = 0.558
- - Balok Gapit 2 = 0.956
Rp 9,029,803.20 - Balok Nok = 3.735
Rp 829,532.16 -
Rp 77,768.64 -
Rp 9,937,104.00 -
15,333,444.01
Harga Material (Rp) KUDA-KUDA 3
Bahan Alat Kemiringan = 30.000
13 = (7 x 10) 14 = (8 x 11) Balok Tarik = 3.933
Kaki Kuda-Kuda = 4.541
- - Tiang Kuda-Kuda = 2.270
- - Balok Sokong = 1.381
- - Balok Gapit 1 = 1.014
- - Balok Gapit 2 = 1.834
Rp 8,395,851.64 -
Rp 29,299,808.78 -
Rp 685,375.64 -
Rp 38,381,036.06 -
42,209,715.76 KUDA-KUDA 1/2 KD 1
Harga Material (Rp) Kemiringan = 30.000
Bahan Alat Balok Tarik = 3.200
13 = (7 x 10) 14 = (8 x 11) Kaki Kuda-Kuda = 3.695
Tiang Kuda-Kuda = 1.847
- - Balok Sokong = 1.555
- - Balok Gapit 1 = 0.659
- - Balok Gapit 2 = 1.252
- -
Rp 3,420,192.60 -
Rp 92,126.40 -
Rp 3,512,319.00 -
5,497,355.03 KUDA-KUDA 1/2 KD 2
Harga Material (Rp) Kemiringan = 30.000
Bahan Alat Balok Tarik = 2.650
13 = (7 x 10) 14 = (8 x 11) Kaki Kuda-Kuda = 3.060
Tiang Kuda-Kuda = 1.530
- - Balok Sokong = 1.376
- - Balok Gapit 1 = 0.558
- - Balok Gapit 2 = 0.956
- -
Rp 21,109,569.84 -
Rp 82,245.08 - VOLUME TOTAL
Rp 21,191,814.91 - KD 1 = 0.5024
26,770,772.65 KD 2 = 0.2157
KD 3 = 0.5750
1/2 KD 1 = 0.2344
1/2 KD 2 = 0.0972
TOTAL = 1.6247
PERHITUNGAN VOLUME PEKE

VOLUME KD 1
DA 1
o Bagian Konstruksi Kuda-Kuda Panjang (m) b (m) h (m) Jumlah
m Balok Tarik 3.2 0.08 0.12 2
m Kaki Kuda-Kuda 3.695 0.08 0.12 2
m Tiang Kuda-Kuda 1.847 0.08 0.12 1
m Balok Sokong 1.555 0.08 0.12 2
m Balok Gapit 1 0.659 0.08 0.12 2
m Balok Gapit 2 1.252 0.08 0.12 2
m Balok Nok 3.6 0.08 0.12 1
TOTAL VOLUME 1 KUDA KUDA TIPE KD1 (m3)
VOLUME KUDA KUDA TIPE KD1 (m3)

VOLUME KD 2

DA 2 Bagian Konstruksi Kuda-Kuda Panjang (m) b (m) h (m) Jumlah


o Balok Tarik 2.650 0.08 0.12 2
m Kaki Kuda-Kuda 3.060 0.08 0.12 2
m Tiang Kuda-Kuda 1.530 0.08 0.12 1
m Balok Sokong 1.376 0.08 0.12 2
m Balok Gapit 1 0.558 0.08 0.12 2
m Balok Gapit 2 0.956 0.08 0.12 2
m Balok Nok 3.735 0.08 0.12 1
m
VOLUME KUDA KUDA TIPE KD2 (m3)

VOLUME KD 3

DA 3 Bagian Konstruksi Kuda-Kuda Panjang (m) b (m) h (m) Jumlah


o Balok Tarik 3.933 0.08 0.12 1
m Kaki Kuda-Kuda 4.541 0.08 0.12 1
m Tiang Kuda-Kuda 2.270 0.08 0.12 1
m Balok Sokong 1.381 0.08 0.12 1
m Balok Gapit 1 1.014 0.08 0.12 1
m Balok Gapit 2 1.834 0.08 0.12 1
m TOTAL VOLUME 1 KUDA KUDA TIPE KD3 (m3)
VOLUME KUDA KUDA TIPE KD3 (m3)

VOLUME 1/2 KD 1
1/2 KD 1 Bagian Konstruksi Kuda-Kuda Panjang (m) b (m) h (m) Jumlah
o Balok Tarik 3.200 0.08 0.12 1
m Kaki Kuda-Kuda 3.695 0.08 0.12 1
m Tiang Kuda-Kuda 1.847 0.08 0.12 1
m Balok Sokong 1.555 0.08 0.12 1
m Balok Gapit 1 0.659 0.08 0.12 1
m Balok Gapit 2 1.252 0.08 0.12 1
m TOTAL VOLUME 1 KUDA KUDA TIPE 1/2 KD 1 (m3)
VOLUME KUDA KUDA TIPE 1/2 KD 1 (m3)

VOLUME 1/2 KD 2

1/2 KD 2 Bagian Konstruksi Kuda-Kuda Panjang (m) b (m) h (m) Jumlah


o Balok Tarik 2.650 0.08 0.12 1
m Kaki Kuda-Kuda 3.060 0.08 0.12 1
m Tiang Kuda-Kuda 1.530 0.08 0.12 1
m Balok Sokong 1.376 0.08 0.12 1
m Balok Gapit 1 0.558 0.08 0.12 1
m Balok Gapit 2 0.956 0.08 0.12 1
m
VOLUME KUDA KUDA TIPE KD2 (m3)

OTAL
m3
m3
m3
m3
m3
m3
UNGAN VOLUME PEKERJAAN ATAP

VOLUME GORDING

Volume (m3) Dimensi Kayu (m)


Jenis Kuda-Kuda Jumlah Kuda-Kuda
0.0614 b h
0.0709 KD 1 2 0.08 0.12
0.0177 KD 2 1 0.08 0.12
0.0299 KD 3 4 0.08 0.12
0.0127 1/2 KD 1 2 0.08 0.12
0.0240 1/2 KD 2 1 0.08 0.12
0.0346 Volume Total Gording (m3)
0.2512
0.5024

VOLUME RANGKA ATAP

Volume (m3) Ukuran (m)


Nama Luasan Bentuk
0.0509 Alas Lebar Atas
0.0588 A Segitiga 8.227 -
0.0147 B Trapesium - 3.6
0.0264 C Jajar Genjang 4.198 -
0.0107 D Jajar Genjang 3.485 -
0.0184 E Segitiga 7.63 -
0.0359 F Segitiga 8.227
G Jajar Genjang 3.485 -
0.2157
H Jajar Genjang 10.5 -

Total Luas (m2)

Volume (m3) VOLUME PENUTUP ATAP


0.0378
0.0436 Ukuran (m)
Nama Luasan Bentuk
0.0218 Alas Lebar Atas
0.0133 A Segitiga 8.227 -
0.0097 B Trapesium - 3.6
0.0176 C Jajar Genjang 4.198 -
0.1437 D Jajar Genjang 3.485 -
0.5750 E Segitiga 7.63 -
F Segitiga 8.227
G Jajar Genjang 3.485 -
H Jajar Genjang 10.5 -
Volume (m3)
Total Luas (m2)
0.0307
0.0355
0.0177
0.0149 VOLUME LISTPLANK
0.0063
0.0120 Nama Panjang (m)
0.1172 A 8.227
0.2344 B 11.827
C 4.198
D 3.485
E 7.63
Volume (m3) F 8.227
0.0254 G 3.485
0.0294 H 10.5
0.0147 Total (m') 57.579
0.0132
0.0054
0.0092
0.0972
UME GORDING

Panjang (m) Jumlah Gording Volume (m3)


3.6 4 0.2765
3.735 4 0.1434
9.8 3 1.1290
3.3 2 0.1267
2.74 2 0.0526
ording (m3) 1.7282

ME RANGKA ATAP

Ukuran (m)
Luas (m2)
Lebar Bawah Tinggi
- 4.113 16.919
11.826 4.113 31.724
- 4.242 17.808
- 3.815 13.295
- 3.815 14.554
4.113 16.919
- 3.815 13.295
- 4.46 46.830

(m2) 171.344

E PENUTUP ATAP

Ukuran (m)
Luas (m2)
Lebar Bawah Tinggi
- 4.113 16.919
11.826 4.113 31.724
- 4.242 17.808
- 3.815 13.295
- 3.815 14.554
4.113 16.919
- 3.815 13.295
- 4.46 46.830
(m2) 171.344

ME LISTPLANK
NO URUTAN PEKERJAAN
1 2
H.1 Pemasangan 1 m3 Konstruksi Kuda-Kuda Kayu Kelas II
H.2 Pemasangan 1 m3 Konstruksi Gording Kayu Kelas II
H.3 Pemasangan 1m2 Rangka Atap Genting Kanmuri Kayu Kelas II
H.4 Pemasangan 1m' Listplank Ukuran (3x20) cm Kayu Kelas II
H.5 Pemasangan 1 m2 Penutup Atap Genting Kanmuri
Total Anggaran Biaya

No Tenaga Kerja
1 2
1 Pekerja
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
TOTAL

No Bahan
1 2
1 Balok Kayu Borneo Kelas II
2 Besi Strip Tebal 5 mm
3 Paku 12 cm
4 Kaso-Kaso (5x7) cm
5 Reng (3x4) cm
6 Paku 5-7 cm
7 Papan Kayu Borneo Super
8 Genting Kanmuri Milenio
TOTAL
RENCANA ANGGARAN BIAYA PEKERJAAN AT

HARGA SATUAN JUMLAH HARGA


VOL SAT
UPAH BAHAN UPAH
3 4 5 6 7 = (3x5)
1.625 m3 Rp 1,864,200.00 Rp 5,789,000.00 Rp 3,028,824.53
1.728 m3 Rp 3,122,535.00 Rp 5,750,000.00 Rp 5,396,340.01
171.344 m2 Rp 22,345.00 Rp 224,000.00 Rp 3,828,679.69
57.579 m' Rp 34,475.00 Rp 61,000.00 Rp 1,985,036.03
171.344 m2 Rp 32,560.00 Rp 123,680.00 Rp 5,578,957.74
ggaran Biaya Rp 19,817,838.00

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah


3 4 5 6 = (4 x 5)
Oh 75.239 Rp 95,600.00 Rp 7,192,837.49
Oh 100.018 Rp 109,300.00 Rp 10,931,969.57
Oh 10.002 Rp 120,000.00 Rp 1,200,216.24
Oh 3.762 Rp 131,000.00 Rp 492,814.70
OTAL Rp 19,817,838.00

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Bahan


3 4 5 6 = (4 x 5)
m3 3.688 Rp 4,750,000.00 Rp 17,519,025.48
Kg 50.294 Rp 32,000.00 Rp 1,609,403.30
Kg 14.283 Rp 15,000.00 Rp 214,246.09
m3 2.399 Rp 3,500,000.00 Rp 8,395,851.64
m3 9.767 Rp 3,000,000.00 Rp 29,299,808.78
Kg 53.734 Rp 16,000.00 Rp 859,747.12
m3 0.622 Rp 5,500,000.00 Rp 3,420,192.60
Buah 1884.783 Rp 11,200.00 Rp 21,109,569.84
OTAL Rp 82,427,844.85
BIAYA PEKERJAAN ATAP

JUMLAH HARGA TOTAL HARGA


BAHAN (UPAH+BAHAN)
8 = (3x6) 9 = (7+8)
Rp 9,405,570.87 Rp 12,434,395.40
Rp 9,937,104.00 Rp 15,333,444.01
Rp 38,381,036.06 Rp 42,209,715.76
Rp 3,512,319.00 Rp 5,497,355.03
Rp 21,191,814.91 Rp 26,770,772.65
Rp 82,427,844.85 Rp 102,245,682.84
ANALISA HARGA SATUAN PEKERJAA

Harga Satuan (Rp)


NO URAIAN KOEF SAT
Upah
1 2 3 4 5
I PEKERJAAN PLAFOND
I.1 Pemasangan 1 m2 Langit - Langit Gypsum Board T.9mm

Pekerja 0.1 Oh Rp 95,600.00


Tukang Kayu 0.05 Oh Rp 109,300.00
Kepala Tukang Kayu 0.005 Oh Rp 120,000.00
Mandor 0.005 Oh Rp 131,000.00
Gypsum Board 0.364 Lembar -
Paku Sekrup 0.11 Kg -
JUMLAH
I.2 Pemasangan 1 m2 Langit - Langit Tripleks Tebal 6 mm

Pekerja 0.1 Oh Rp 95,600.00


Tukang Kayu 0.1 Oh Rp 109,300.00
Kepala Tukang Kayu 0.01 Oh Rp 120,000.00
Mandor 0.005 Oh Rp 131,000.00
Tripleks 0.375 Lembar -
Paku Tripleks 0.03 Kg -
JUMLAH
I.3 Pemasangan 1m' List Plafond Gypsum

Pekerja 0.05 Oh Rp 95,600.00


Tukang Kayu 0.05 Oh Rp 109,300.00
Kepala Tukang Kayu 0.005 Oh Rp 120,000.00
Mandor 0.003 Oh Rp 131,000.00
List Gypsum 1.1 m -
Lem Kayu 0.05 Kg -
JUMLAH
I.4 Pemasangan 1m2 Rangka Plafond Kayu Borneo

Pekerja 0.15 Oh Rp 95,600.00


Tukang Kayu 0.3 Oh Rp 109,300.00
Kepala Tukang Kayu 0.03 Oh Rp 120,000.00
Mandor 0.01 Oh Rp 131,000.00
Kayu Balok Borneo 5/7 0.0154 m3 -
Paku 5 cm - 7 cm 0.2 Kg -
JUMLAH
I.5 Pemasangan 1m' List Plafond Kayu Profil

Pekerja 0.03 Oh Rp 95,600.00


Tukang Kayu 0.03 Oh Rp 109,300.00
Kepala Tukang Kayu 0.003 Oh Rp 120,000.00
Mandor 0.001 Oh Rp 131,000.00
List Kayu Profil 1.05 m -
Paku 5 cm - 7 cm 0.01 Kg -
JUMLAH
GA SATUAN PEKERJAAN PLAFOND

Harga Satuan (Rp) Jumlah Harga (Rp)


Jumlah (Rp)
Bahan Alat Upah Bahan Alat
6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)
PEKERJAAN PLAFOND

- - Rp 9,560.00 - - Rp 9,560.00
- - Rp 5,465.00 - - Rp 5,465.00
- - Rp 600.00 - - Rp 600.00
- - Rp 655.00 - - Rp 655.00
Rp 65,000.00 - - Rp 23,660.00 - Rp 23,660.00
Rp 40,000.00 - - Rp 4,400.00 - Rp 4,400.00
Rp 16,280.00 Rp 28,060.00 - Rp 44,340.00

- - Rp 9,560.00 - - Rp 9,560.00
- - Rp 10,930.00 - - Rp 10,930.00
- - Rp 1,200.00 - - Rp 1,200.00
- - Rp 655.00 - - Rp 655.00
Rp 85,000.00 - - Rp 31,875.00 - Rp 31,875.00
Rp 20,000.00 - - Rp 600.00 - Rp 600.00
Rp 22,345.00 Rp 32,475.00 - Rp 54,820.00

- - Rp 4,780.00 - - Rp 4,780.00
- - Rp 5,465.00 - - Rp 5,465.00
- - Rp 600.00 - - Rp 600.00
- - Rp 393.00 - - Rp 393.00
Rp 21,000.00 - - Rp 23,100.00 - Rp 23,100.00
Rp 15,000.00 - - Rp 750.00 - Rp 750.00
Rp 11,238.00 Rp 23,850.00 - Rp 35,088.00

- - Rp 14,340.00 - - Rp 14,340.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
- - Rp 1,310.00 - - Rp 1,310.00
Rp 4,750,000.00 - - Rp 73,150.00 - Rp 73,150.00
Rp 16,000.00 - - Rp 3,200.00 - Rp 3,200.00
Rp 52,040.00 Rp 76,350.00 - Rp 128,390.00

- - Rp 2,868.00 - - Rp 2,868.00
- - Rp 3,279.00 - - Rp 3,279.00
- - Rp 360.00 - - Rp 360.00
- - Rp 131.00 - - Rp 131.00
Rp 14,000.00 - - Rp 14,700.00 - Rp 14,700.00
Rp 16,000.00 - - Rp 160.00 - Rp 160.00
Rp 6,638.00 Rp 14,860.00 - Rp 21,498.00
REKAPITULASI KEBUTUHAN TENA

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
I
I.1 Pemasangan 1m2 Langit-Langit Gypsum Board T.9mm 298.980 - m2
Pekerja 0.100 Oh
Tukang Kayu 0.050 Oh
Kepala Tukang Kayu 0.005 Oh
Mandor 0.005 Oh
Gypsum Board 0.364 Lembar
Paku Sekrup 0.110 Kg

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
I.2 Pemasangan 1 m2 Langit - Langit Tripleks Tebal 6 mm 41.064 - m2
Pekerja 0.1000 Oh
Tukang Kayu 0.1000 Oh
Kepala Tukang Kayu 0.0100 Oh
Mandor 0.0050 Oh
Tripleks 0.3750 Lembar
Paku Tripleks 0.0300 Kg

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
I.3 Pemasangan 1m' List Plafond Gypsum 154.703 - m'
Pekerja 0.05 Oh
Tukang Kayu 0.05 Oh
Kepala Tukang Kayu 0.005 Oh
Mandor 0.003 Oh
List Gypsum 1.1 m
Lem Kayu 0.05 Kg

No Uraian Pekerjaan Vol Koef Satuan


No Uraian Pekerjaan Vol Koef Satuan
1 2 3 4 5
I.4 Pemasangan 1m2 Rangka Plafond Kayu Borneo 298.980 - m2
Pekerja 0.15 Oh
Tukang Kayu 0.3 Oh
Kepala Tukang Kayu 0.03 Oh
Mandor 0.01 Oh
Kayu Balok Borneo 5/7 0.0154 m
Paku 5 cm - 7 cm 0.2 Kg

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
I.5 Pemasangan 1m' List Plafond Kayu Profil 46.094 - m'
Pekerja 0.03 Oh
Tukang Kayu 0.03 Oh
Kepala Tukang Kayu 0.003 Oh
Mandor 0.001 Oh
List Kayu Profil 1.05 m
Paku 5 cm - 7 cm 0.01 Kg
KEBUTUHAN TENAGA KERJA DAN BAHAN PEKERJAAN PLAFOND

Harga Satuan (Rp) Jumlah yang Dibutuhkan


Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
PEKERJAAN PLAFOND

Rp 95,600.00 - - 29.8979795 - -
Rp 109,300.00 - - 14.9489898 - -
Rp 120,000.00 - - 1.49489898 - -
Rp 131,000.00 - - 1.49489898 - -
- Rp 65,000.00 - - 108.8286454 -
- Rp 40,000.00 - - 32.88777745 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 4.1063895 - -
Rp 109,300.00 - - 4.1063895 - -
Rp 120,000.00 - - 0.41063895 - -
Rp 131,000.00 - - 0.20531948 - -
- Rp 85,000.00 - - 15.39896063 -
- Rp 20,000.00 - - 1.23191685 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - - 7.73515 - -
Rp 109,300.00 - - 7.73515 - -
Rp 120,000.00 - - 0.773515 - -
Rp 131,000.00 - - 0.464109 - -
- Rp 21,000.00 - - 170.1733 -
- Rp 15,000.00 - - 7.73515 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - 44.8469693 - -
Rp 109,300.00 - 89.6939385 - -
Rp 120,000.00 - 8.96939385 - -
Rp 131,000.00 - 2.98979795 - -
- Rp 4,750,000.00 - 4.604288843 -
- Rp 16,000.00 - 59.795959 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)

Rp 95,600.00 - 1.38282 - -
Rp 109,300.00 - 1.38282 - -
Rp 120,000.00 - 0.138282 - -
Rp 131,000.00 - 0.046094 - -
- Rp 14,000.00 - 48.3987 -
- Rp 16,000.00 - 0.46094 -
Jumlah
Total
D

Harga Material (Rp)


Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

No
Rp 2,858,246.84 - -
1
Rp 1,633,924.58 - -
Rp 179,387.88 - - 2
Rp 195,831.77 - - 3
- Rp 7,073,861.95 - 4
- Rp 1,315,511.10 - 5
Rp 4,867,391.06 Rp 8,389,373.05 - 6
Rp 13,256,764.11 7
Harga Material (Rp) 8
Upah Bahan Alat 9
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11) 10
11
Rp 392,570.84 - - 12
Rp 448,828.37 - -
Rp 49,276.67 - -
Rp 26,896.85 - -
- Rp 1,308,911.65 -
- Rp 24,638.34 -
Rp 917,572.73 Rp 1,333,549.99 -
Rp 2,251,122.72
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 739,480.34 - -
Rp 845,451.90 - -
Rp 92,821.80 - -
Rp 60,798.28 - -
- Rp 3,573,639.30 -
- Rp 116,027.25 -
Rp 1,738,552.31 Rp 3,689,666.55 -
Rp 5,428,218.86
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 4,287,370.26 - -
Rp 9,803,547.48 - -
Rp 1,076,327.26 - -
Rp 391,663.53 - -
- Rp 21,870,372.00 -
- Rp 956,735.34 -
Rp 15,558,908.53 Rp 22,827,107.35 -
Rp 38,386,015.88
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)

Rp 132,197.59 - -
Rp 151,142.23 - -
Rp 16,593.84 - -
Rp 6,038.31 - -
- Rp 677,581.80 -
- Rp 7,375.04 -
Rp 305,971.97 Rp 684,956.84 -
Rp 990,928.81
No Elevasi (m)

1 1.90
2 3.00
3 3.00
4 2.70
5 3.00
6 3.00
7 3.00
8 3.00
9 3.00
10 3.00
11 3.00
12 3.00

TOTAL VOLU
No
1
2
3
4
5
Total
PERH

Pemasangan 1 m2 Langit

LANTAI 1

Elevasi (m) Nama Ruangan As Verikal Panjang (m) As Horizontal


2A-4A 3.7 A1-C1
1.90 Garasi
4A-5A 1.8 A1-C1'
3.00 Teras 1C-3C 2 C1-D1
3.00 Tangga 1 5A-6A 1 A1-B1
2.70 Kamar Mandi/WC 4A-5A 1.8 C'4-D'4
3.00 Foyer 3C-4C 2.2 C3-D3
3.00 Ruang Tamu 1D-4D 4.2 D1-F1
3.00 Ruang Keluarga 4D-7D 5.8 D4-G4
3.00 Ruang Makan 5B-7B 4 B5-D5
3.00 Dapur 6A-7A 3 6A-6B
3.00 Ruangan Tambahan 4D-5D 1.8 D'4 - D4
3.00 Ruang Tidur Utama 7E-9E 8 E9-G9
3.00 Kamar Mandi Utama 9E-10E 2 E10-G10
TOTAL VOLUME PLAFOND GYPSUM LT 1

Pemasangan 1 m2
Pemasangan

LANTAI 1 LANTAI 2

No As vertikal Panjang (m) No


1 1A-3A 2 1
2 2A-5A 5.5 2
3 3A-4A 2.2 3
4 2A-4A 3.7 4
5 4A-5A 1.8 5
6 IF-4F 4.4 6
7 6A-7A 3 7
8 4G-7G 5.8 8
9 BORDES 1.29 9
10 7G-9G 8 10
11 9G-10G 2
TOTAL PANJANG (m)
12 8A-9A 1.2
13 9A-10A 2
14 9B-10B 2 No
1
TOTAL PANJANG (m) 44.89
2
3
No As Horizontal Panjang (m) 4
1 A7-G7 14 5
2 E9-G9 4 6
3 E10-G10 4 7
4 A8'-B8' 3.15 8
9
TOTAL PANJANG (m) 25.15
10
TOTAL PANJANG (m)
Pemasangan Rang

LANTAI 1

Nama Ruangan As Verikal Panjang (m) As Horizontal Lebar (m)


2A-4A 3.7 A1-C1 5.4
Garasi
4A-5A 1.8 A1-C1' 5.563
Teras 1C-3C 2 C1-D1 3
Tangga 1 5A-6A 1 A1-B1 2.948
Kamar Mandi/WC 4A-5A 1.8 C'4-D'4 1.5
Foyer 3C-4C 2.2 C3-D3 3
Ruang Tamu 1D-4D 4.2 D1-F1 3.4
Ruang Keluarga 4D-7D 5.8 D4-G4 5.6
Ruang Makan 5B-7B 4 B5-D5 5.25
Dapur 6A-7A 3 6A-6B 3.15
Ruangan Tambahan 4D-5D 1.8 D'4 - D4 0.91
Ruang Tidur Utama 7E-9E 8 E9-G9 4
Kamar Mandi Utama 9E-10E 2 E10-G10 4
TOTAL VOLUME RANGKA PLAFOND LT 1

Pemasangan Li
Panjang (m) No Panjang (m)
6.594 1 9.902
9.695 Total 9.902
10.208
5.495
4.2
36.192
PERHITUNGAN VOLUME PEKERJAAN PLAFOND

Pemasangan 1 m2 Langit - Langit Gypsum Board T.9mm

LANTAI 2

Lebar (m) Luas (m2) No Elevasi (m) Nama Ruangan


5.4 19.9800 1 6.78 Tangga 2
5.563 10.0134 2 6.78 Ruang Tidur 1
3 6.0000 3 6.78 Ruang Tidur 2
2.948 2.9480 4 6.78 Ruang Tidur 3
1.5 2.7000 5 6.34 Toilet 1
3 6.6000
6 6.34 Toilet 2
3.4 14.2800
5.6 32.4800 7 6.78 Hall
5.25 21.0000
3.15 9.4500 8 6.78 Ruang Keluarga
0.91 1.6380
4 32.0000
TOTAL VOLUME PLAFOND GY
4 8.0000
167.0894

Pemasangan 1 m2 Langit - Langit Tripleks

Plafond Tripleks Pada Tritisan


No Nama Area Panjang (m) Lebar (m) Luas (m2)
1 L1 7.379 0.785 5.793
2 L2 11.265 0.785 8.843
3 L3 10.208 0.785 8.013
4 L4 6.28 0.785 4.930
5 L5 4.4 0.785 3.454
6 L6 3.415 0.785 2.681
TOTAL (m2) 33.713
Pemasangan 1 m' List Plafond

LANTAI 2

As vertikal Panjang (m)


1G-5G 6
1F-4F 4.2
1F-4F (R. Keluarga) 4.2
5G-7G 4
5E-7E 4
5E-7E (R. Tidur) 4
5C-7C 4
4C-7C 5.8
4A-7A 5.8
4C-5C 1.8
TOTAL PANJANG (m) 43.8

As Horizontal Panjang (m)


F1-G1 2.2
D1-F1 3.4
C2-D2 3
B3-C3 2.015
A3-B3 2.848
C5-G5 8.6
E7-G7 4
C7-E7 4.6
A7-C7 5.1
A4-C4 5.1
TOTAL PANJANG (m) 40.863
Pemasangan Rangka Plafond Kayu Borneo

LANTAI 2

Luas (m2) No Elevasi (m) Nama Ruangan As Verikal


19.9800 1 6.78 Tangga 2 1F-6F
10.0134 2 6.78 Ruang Tidur 1 5E-7E
6.0000 3 6.78 Ruang Tidur 2 5C-7C
2.9480 4 6.78 Ruang Tidur 3 4A-7A
2.7000 5 6.34 Toilet 1 3A-4A
6.6000 3C-3'C
6 6.34 Toilet 2
14.2800 3'C-3'D
32.4800 7 6.78 Hall 1E-5E
21.0000 1E-5E
9.4500 8 6.78 Ruang Keluarga 2C-5C
1.6380 3'C-3'D
32.0000
TOTAL VOLUME RANGKA PLAFOND LT 2
8.0000
167.0894

Pemasangan List Plafond Kayu Profil


LANTAI 2

As Verikal Panjang (m) As Horizontal Lebar (m) Luas (m2)


1F-6F 6 F1-G1 2.2 13.2000
5E-7E 4 E5-G5 4 16.0000
5C-7C 4 C5-E5 4.6 18.4000
4A-7A 5.8 A4-C4 5.4 31.3200
3A-4A 3.7 A3-C3 2.93 10.8410
3C-3'C 1.183 B3-C3 2.315 2.7386
3'C-3'D 1.107 B3-C'3 1.65 1.8266
1E-5E 6 E1-F1 1.8 10.8000
1E-5E 6 D1-E1 1.6 9.6000
2C-5C 5.5 C2-D2 3 16.5000
3'C-3'D 1.107 C'3-C3 0.6 0.6642
VOLUME PLAFOND GYPSUM LT 2 131.8904

Plafond Tripleks Pada Sepanjang Ruang Tidur


No Nama Area Panjang (m) Lebar (m)
1 L1 4.748 0.5
2 L2 9.953 0.5
TOTAL (m2)
LANTAI 2

Panjang (m) As Horizontal Lebar (m) Luas (m2)


6 F1-G1 2.2 13.2000
4 E5-G5 4 16.0000
4 C5-E5 4.6 18.4000
5.8 A4-C4 5.4 31.3200
3.7 A3-C3 2.93 10.8410
1.183 B3-C3 2.315 2.7386
1.107 B3-C'3 1.65 1.8266
6 E1-F1 1.8 10.8000
6 D1-E1 1.6 9.6000
5.5 C2-D2 3 16.5000
1.107 C'3-C3 0.6 0.6642
ANGKA PLAFOND LT 2 131.8904
NO
1
I.1
I.2
I.3
1.4
1.5
Total Anggaran Biay

No
1
1
2
3
4
TOTAL

No
1
1
2
3
4
5
g Ruang Tidur 6
Luas (m2) 7
2.374 8
4.977 9
TOTAL
7.351
RENCAN

HARGA SATUAN
URUTAN PEKERJAAN VOL SAT
UPAH
2 3 4 5
Pemasangan 1m2 Langit-Langit Gypsum Board T.9mm 298.980 m2 Rp 16,280.00
Pemasangan 1 m2 Langit - Langit Tripleks Tebal 6 mm 41.064 m2 Rp 22,345.00
Pemasangan 1 m' List Plafond Gypsum 154.703 m' Rp 11,238.00
Pemasangan 1m2 Rangka Plafond Kayu Borneo 5/7 298.980 m2 Rp 52,040.00
Pemasangan 1m' List Plafond Kayu Profil 46.094 m' Rp 6,638.00
Total Anggaran Biaya

Tenaga Kerja Satuan Jumlah Kebutuhan


2 3 4
Pekerja Oh 87.97
Tukang Kayu Oh 117.87
Kepala Tukang Kayu Oh 11.79
Mandor Oh 5.20
TOTAL

Bahan Satuan Jumlah Kebutuhan


2 3 4
Gypsum Board Tebal 9 mm Lembar 108.8286
Paku Sekrup Kg 32.8878
Tripleks (120 x 240) Tebal 6 mm Lembar 15.3990
Paku Tripleks Kg 1.2319
List Gypsum m 170.1733
Lem Kayu Kg 7.7352
Kayu Balok Borneo 5/7 m3 4.6043
Paku 5 cm - 7 cm Kg 60.2569
List Kayu Profil m 48.3987
TOTAL
RENCANA ANGGARAN BIAYA PEKERJAAN PLAFOND

HARGA SATUAN JUMLAH HARGA TOTAL HARGA


BAHAN UPAH BAHAN (UPAH+BAHAN)
6 7 = (3x5) 8 = (3x6) 9 = (7+8)
Rp 28,060.00 Rp 4,867,391.06 Rp 8,389,373.05 Rp 13,256,764.11
Rp 32,475.00 Rp 917,572.73 Rp 1,333,549.99 Rp 2,251,122.72
Rp 23,850.00 Rp 1,738,552.31 Rp 3,689,666.55 Rp 5,428,218.86
Rp 76,350.00 Rp 15,558,908.53 Rp 22,827,107.35 Rp 38,386,015.88
Rp 14,860.00 Rp 305,971.97 Rp 684,956.84 Rp 990,928.81
Rp 23,388,396.61 Rp 36,924,653.78 Rp 60,313,050.39

Harga Satuan (Rp) Biaya Upah


5 6 = (4 x 5)
Rp 95,600.00 Rp 8,409,865.87
Rp 109,300.00 Rp 12,882,894.55
Rp 120,000.00 Rp 1,414,407.45
Rp 131,000.00 Rp 681,228.74
Rp 23,388,396.61

Harga Satuan (Rp) Biaya Bahan


5 6 = (4 x 5)
Rp 65,000.00 Rp 7,073,861.95
Rp 40,000.00 Rp 1,315,511.10
Rp 85,000.00 Rp 1,308,911.65
Rp 20,000.00 Rp 24,638.34
Rp 21,000.00 Rp 3,573,639.30
Rp 15,000.00 Rp 116,027.25
Rp 4,750,000.00 Rp 21,870,372.00
Rp 16,000.00 Rp 964,110.38
Rp 14,000.00 Rp 677,581.80
Rp 36,924,653.78
ANALISA HARGA SATUAN PEKERJAAN E

Harga Satuan (Rp)


NO URAIAN KOEF SAT
Upah
1 2 3 4 5
J PEKERJAAN ELEKTRIKAL
J.1 Pemasangan 1 Buah MCB (KWH Meter )

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
L Bow 2 Buah -
Klem 24 Buah -
MCB Domae 1 Phase 25A 1 Buah -
JUMLAH
J.2 Pemasangan 1 Buah Saklar Tunggal

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
Saklar Tunggal Broco 1 Buah -
JUMLAH
J.3 Pemasangan 1 Buah Saklar Ganda

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
Saklar Ganda Broco 1 Buah -
JUMLAH
J.4 Pemasangan 1 Buah Saklar Hotel

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
Saklar Hotel Pieno E8231L2F 1 Buah -
JUMLAH
J.5 Pemasangan 1 Buah Stop Kontak

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
Stop Kontak Broco 1 Buah -
JUMLAH
J.6 Pemasangan 1 Buah Stop Kontak AC

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
Stop Kontak AC Panasonic 1 Buah -
JUMLAH
J.7 Pemasangan 1 Buah Stop Kontak Waterproof

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
Stop Kontak Waterproof Panasonic 1 Buah -
JUMLAH
J.8 Pemasangan 1 Buah Stop Kontak Antena TV

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
Stop Kontak Antena TV Broco 1 Buah -
JUMLAH
J.9 Pemasangan 1 Buah Stop Kontak Telepon

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
Stop Kontak Telepon Broco 1 Buah -
JUMLAH
J.10 Pemasangan 1 Buah Kotak Pembagi (Distributor Point)

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
L Bow 2 Buah -
Klem 24 Buah -
Kotak Pembagi (Distributor Point) 1 Buah -
JUMLAH
J.11 Pemasangan 1 Buah Lampu Downlight

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
Klem 24 Buah -
Las Doof 3 Buah -
Lampu Downlight Panasonic 4 Inch 1 Buah -
Fitting 1 Buah -
JUMLAH
J.12 Pemasangan 1 Buah Lampu LED TL

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Pipa Listrik 5/8" 3 Batang -
Kabel Prima NYM 3x2,5 15 m' -
T dus 1 Buah -
Klem 24 Buah -
Las Doof 3 Buah -
Lampu LED TL Phillips 1 Buah -
Kap Lampu 1 Buah -
JUMLAH
J.13 Pemasangan 1 Buah Lampu Taman

Tukang Listrik 0.3 Oh Rp 109,300.00


Kepala Tukang Listrik 0.03 Oh Rp 120,000.00
Lampu Taman + Tiang 1 Buah -
JUMLAH
SATUAN PEKERJAAN ELEKTRIKAL

Harga Satuan (Rp) Jumlah Harga (Rp)


Jumlah (Rp)
Bahan Alat Upah Bahan Alat
6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)
PEKERJAAN ELEKTRIKAL

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 1,100.00 - - Rp 2,200.00 - Rp 2,200.00
Rp 200.00 - - Rp 4,800.00 - Rp 4,800.00
Rp 56,900.00 - - Rp 56,900.00 - Rp 56,900.00
Rp 36,390.00 Rp 247,650.00 - Rp 284,040.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 15,000.00 - - Rp 15,000.00 - Rp 15,000.00
Rp 36,390.00 Rp 198,750.00 - Rp 235,140.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 17,500.00 - - Rp 17,500.00 - Rp 17,500.00
Rp 36,390.00 Rp 201,250.00 - Rp 237,640.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 25,900.00 - - Rp 25,900.00 - Rp 25,900.00
Rp 36,390.00 Rp 209,650.00 - Rp 246,040.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 15,000.00 - - Rp 15,000.00 - Rp 15,000.00
Rp 36,390.00 Rp 198,750.00 - Rp 235,140.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 34,800.00 - - Rp 34,800.00 - Rp 34,800.00
Rp 36,390.00 Rp 218,550.00 - Rp 254,940.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 42,000.00 - - Rp 42,000.00 - Rp 42,000.00
Rp 36,390.00 Rp 225,750.00 - Rp 262,140.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 38,000.00 - - Rp 38,000.00 - Rp 38,000.00
Rp 36,390.00 Rp 221,750.00 - Rp 258,140.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 35,000.00 - - Rp 35,000.00 - Rp 35,000.00
Rp 36,390.00 Rp 218,750.00 - Rp 255,140.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 1,100.00 - - Rp 2,200.00 - Rp 2,200.00
Rp 200.00 - - Rp 4,800.00 - Rp 4,800.00
Rp 62,500.00 - - Rp 62,500.00 - Rp 62,500.00
Rp 36,390.00 Rp 253,250.00 - Rp 289,640.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 200.00 - - Rp 4,800.00 - Rp 4,800.00
Rp 300.00 - - Rp 900.00 - Rp 900.00
Rp 54,000.00 - - Rp 54,000.00 - Rp 54,000.00
Rp 15,000.00 - - Rp 15,000.00 - Rp 15,000.00
Rp 36,390.00 Rp 258,450.00 - Rp 294,840.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 200.00 - - Rp 4,800.00 - Rp 4,800.00
Rp 300.00 - - Rp 900.00 - Rp 900.00
Rp 73,000.00 - - Rp 73,000.00 - Rp 73,000.00
Rp 22,500.00 - - Rp 22,500.00 - Rp 22,500.00
Rp 36,390.00 Rp 284,950.00 - Rp 321,340.00

- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 214,025.00 - - Rp 214,025.00 - Rp 214,025.00
Rp 36,390.00 Rp 214,025.00 - Rp 250,415.00
REKAPITULASI KEBUTUHAN TENAGA KE

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J PEKER
J.1 Pemasangan 1 Buah MCB (KWH Meter) 1 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
L Bow 2 Buah
Klem 24 Buah
MCB Domae 1 Phase 25A 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J.2 Pemasangan 1 Buah Saklar Tunggal 11 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
Saklar Tunggal Broco 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J.3 Pemasangan 1 Buah Saklar Ganda 13 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
Saklar Ganda Broco 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


No Uraian Pekerjaan Vol Koef Satuan
1 2 3 4 5
J.4 Pemasangan 1 Buah Saklar Hotel 2 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
Saklar Hotel Pieno E8231L2F 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J.5 Pemasangan 1 Buah Stop Kontak 27 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
Stop Kontak Broco 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J.6 Pemasangan 1 Buah Stop Kontak AC 7 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
Stop Kontak AC Panasonic 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J.7 Pemasangan 1 Buah Stop Kontak Waterproof 4 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
Stop Kontak Waterproof Panasonic 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J.8 Pemasangan 1 Buah Stop Kontak Antena TV 4 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
Stop Kontak Antena TV 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J.9 Pemasangan 1 Buah Stop Kontak Telepon 3 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
Stop Kontak Telepon 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J.10 Pemasangan 1 Buah Kotak Pembagi (Distributor Point) 2 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
L Bow 2 Buah
Klem 24 Buah
Kotak Pembagi (Distributor Point) 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


No Uraian Pekerjaan Vol Koef Satuan
1 2 3 4 5
J.11 Pemasangan 1 Buah Lampu Downlight 26 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
Klem 24 Buah
Las Doof 3 Buah
Lampu Downlight Panasonic 4 Inch 1 Buah
Fitting 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J.12 Pemasangan 1 Buah Lampu LED TL 2 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Pipa Listrik 5/8" 3 Batang
Kabel Prima NYM 3x2,5 15 m'
T dus 1 Buah
Klem 24 Buah
Las Doof 3 Buah
Lampu LED TL Phillips 1 Buah
Kap Lampu 1 Buah

No Uraian Pekerjaan Vol Koef Satuan


1 2 3 4 5
J.13 Pemasangan 1 Buah Lampu Taman 2 - Buah
Tukang Listrik 0.3 Oh
Kepala Tukang Listrik 0.03 Oh
Lampu Taman + Tiang 1 Buah
UTUHAN TENAGA KERJA DAN BAHAN PEKERJAAN ELEKTRIKAL

Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater


Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)
PEKERJAAN ELEKTRIKAL

Rp 109,300.00 - - 0.3 - - Rp 32,790.00


Rp 120,000.00 - - 0.03 - - Rp 3,600.00
- Rp 5,250.00 - - 3 - -
- Rp 10,800.00 - - 15 - -
- Rp 6,000.00 - - 1 - -
- Rp 1,100.00 - - 2 - -
- Rp 200.00 - - 24 - -
- Rp 56,900.00 - - 1 - -
Jumlah Rp 36,390.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 3.3 - - Rp 360,690.00


Rp 120,000.00 - - 0.33 - - Rp 39,600.00
- Rp 5,250.00 - - 33 - -
- Rp 10,800.00 - - 165 - -
- Rp 6,000.00 - - 11 - -
- Rp 15,000.00 - - 11 - -
Jumlah Rp 400,290.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 3.9 - - Rp 426,270.00


Rp 120,000.00 - - 0.39 - - Rp 46,800.00
- Rp 5,250.00 - - 39 - -
- Rp 10,800.00 - - 195 - -
- Rp 6,000.00 - - 13 - -
- Rp 17,500.00 - - 13 - -
Jumlah Rp 473,070.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 0.6 - - Rp 65,580.00


Rp 120,000.00 - - 0.06 - - Rp 7,200.00
- Rp 5,250.00 - - 6 - -
- Rp 10,800.00 - - 30 - -
- Rp 6,000.00 - - 2 - -
- Rp 25,900.00 - - 2 - -
Jumlah Rp 72,780.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 8.1 - - Rp 885,330.00


Rp 120,000.00 - - 0.81 - - Rp 97,200.00
- Rp 5,250.00 - - 81 - -
- Rp 10,800.00 - - 405 - -
- Rp 6,000.00 - - 27 - -
- Rp 15,000.00 - - 27 - -
Jumlah Rp 982,530.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 2.1 - - Rp 229,530.00


Rp 120,000.00 - - 0.21 - - Rp 25,200.00
- Rp 5,250.00 - - 21 - -
- Rp 10,800.00 - - 105 - -
- Rp 6,000.00 - - 7 - -
- Rp 34,800.00 - - 7 - -
Jumlah Rp 254,730.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 1.2 - - Rp 131,160.00


Rp 120,000.00 - - 0.12 - - Rp 14,400.00
- Rp 5,250.00 - - 12 - -
- Rp 10,800.00 - - 60 - -
- Rp 6,000.00 - - 4 - -
- Rp 42,000.00 - - 4 - -
Jumlah Rp 145,560.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 1.2 - - Rp 131,160.00


Rp 120,000.00 - - 0.12 - - Rp 14,400.00
- Rp 5,250.00 - - 12 - -
- Rp 10,800.00 - - 60 - -
- Rp 6,000.00 - - 4 - -
- Rp 35,000.00 - - 4 - -
Jumlah Rp 145,560.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 0.9 - - Rp 98,370.00


Rp 120,000.00 - - 0.09 - - Rp 10,800.00
- Rp 5,250.00 - - 9 - -
- Rp 10,800.00 - - 45 - -
- Rp 6,000.00 - - 3 - -
- Rp 35,000.00 - - 3 - -
Jumlah Rp 109,170.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 0.6 - - Rp 65,580.00


Rp 120,000.00 - - 0.06 - - Rp 7,200.00
- Rp 5,250.00 - - 6 - -
- Rp 10,800.00 - - 30 - -
- Rp 6,000.00 - - 2 - -
- Rp 1,100.00 - - 4 - -
- Rp 200.00 - - 48 - -
- Rp 62,500.00 - - 2 - -
Jumlah Rp 72,780.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 7.8 - - Rp 852,540.00


Rp 120,000.00 - - 0.78 - - Rp 93,600.00
- Rp 5,250.00 - - 78 - -
- Rp 10,800.00 - - 390 - -
- Rp 6,000.00 - - 26 - -
- Rp 200.00 - - 624 - -
- Rp 300.00 - - 78 - -
- Rp 54,000.00 - - 26 - -
- Rp 15,000.00 - - 26 - -
Jumlah Rp 946,140.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 0.6 - - Rp 65,580.00


Rp 120,000.00 - - 0.06 - - Rp 7,200.00
- Rp 5,250.00 - - 6 - -
- Rp 10,800.00 - - 30 - -
- Rp 6,000.00 - - 2 - -
- Rp 200.00 - - 48 - -
- Rp 300.00 - - 6 - -
- Rp 73,000.00 - - 2 - -
- Rp 22,500.00 - - 2 - -
Jumlah Rp 72,780.00
Total Rp
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Mater
Upah Bahan Alat Upah Bahan Alat Upah
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

Rp 109,300.00 - - 0.6 - - Rp 65,580.00


Rp 120,000.00 - - 0.06 - - Rp 7,200.00
- Rp 214,025.00 - - 2 -
Jumlah Rp 72,780.00
Total Rp
VOLUME PEKERJAA

Harga Material (Rp)


Bahan Alat No
13 = (7 x 10) 14 = (8 x 11) 1
2
3
- - 4
- - 5
Rp 15,750.00 - 6
Rp 162,000.00 - 7
Rp 6,000.00 - 8
Rp 2,200.00 - 9
Rp 4,800.00 - 10
Rp 56,900.00 - 11
Rp 247,650.00 - 12
284,040.00 13
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 173,250.00 -
Rp 1,782,000.00 -
Rp 66,000.00 -
Rp 165,000.00 -
Rp 2,186,250.00 -
2,586,540.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 204,750.00 -
Rp 2,106,000.00 -
Rp 78,000.00 -
Rp 227,500.00 -
Rp 2,616,250.00 -
3,089,320.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 31,500.00 -
Rp 324,000.00 -
Rp 12,000.00 -
Rp 51,800.00 -
Rp 419,300.00 -
492,080.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 425,250.00 -
Rp 4,374,000.00 -
Rp 162,000.00 -
Rp 405,000.00 -
Rp 5,366,250.00 -
6,348,780.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

-
-
Rp 110,250.00 -
Rp 1,134,000.00 -
Rp 42,000.00 -
Rp 243,600.00 -
Rp 1,529,850.00 -
1,784,580.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 63,000.00 -
Rp 648,000.00 -
Rp 24,000.00 -
Rp 168,000.00 -
Rp 903,000.00 -
1,048,560.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 63,000.00 -
Rp 648,000.00 -
Rp 24,000.00 -
Rp 140,000.00 -
Rp 875,000.00 -
1,020,560.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 47,250.00 -
Rp 486,000.00 -
Rp 18,000.00 -
Rp 105,000.00 -
Rp 656,250.00 -
765,420.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 31,500.00 -
Rp 324,000.00 -
Rp 12,000.00 -
Rp 4,400.00 -
Rp 9,600.00 -
Rp 125,000.00 -
Rp 506,500.00 -
579,280.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 409,500.00 -
Rp 4,212,000.00 -
Rp 156,000.00 -
Rp 124,800.00 -
Rp 23,400.00 -
Rp 1,404,000.00 -
Rp 390,000.00 -
Rp 6,719,700.00 -
7,665,840.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 31,500.00 -
Rp 324,000.00 -
Rp 12,000.00 -
Rp 9,600.00 -
Rp 1,800.00 -
Rp 146,000.00 -
Rp 45,000.00 -
Rp 569,900.00 -
642,680.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
Rp 428,050.00 -
Rp 428,050.00 -
500,830.00
VOLUME PEKERJAAN ELEKTRIKAL

NO
Nama Barang Jumlah Satuan
KWH Meter 1 Buah 1
Saklar Tunggal 11 Buah J.1
Saklar Ganda 13 Buah J.2
Saklar Hotel 2 Buah J.3
Stop Kontak 27 Buah J.4
Stop Kontak AC 7 Buah J.5
Stop Kontak Waterproof 4 Buah J.6
Stop Kontak Antena TV 4 Buah J.7
Stop Kotak Telepon 3 Buah J.8
Kotak Pembagi (Distributor Point) 2 Buah J.9
Lampu Downlight Panasonic 4 Inch 26 Buah J.10
Lampu LED TL Phillips 2 Buah J.11
Lampu Taman 2 Buah J.12
J.13

No
1
1
2

No
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
RENCANA ANGGARAN

HARGA SATUAN
URUTAN PEKERJAAN VOL SAT
UPAH
2 3 4 5
Pemasangan MCB (KWH Meter ) 1 Buah Rp 36,390.00
Pemasangan Saklar Tunggal 11 Buah Rp 36,390.00
Pemasangan Saklar Ganda 13 Buah Rp 36,390.00
Pemasangan Saklar Hotel 2 Buah Rp 36,390.00
Pemasangan Stop Kontak 27 Buah Rp 36,390.00
Pemasangan Stop Kontak AC 7 Buah Rp 36,390.00
Stop Kontak Waterproof 4 Buah Rp 36,390.00
Pemasangan Stop Kontak Antena TV 4 Buah Rp 36,390.00
Pemasangan Stop Kontak Telepon 3 Buah Rp 36,390.00
Pemasangan Kotak Pembagi (Distributor Point) 2 Buah Rp 36,390.00
Pemasangan Lampu Downlight Panasonic 4 Inch 26 Buah Rp 36,390.00
Pemasangan Lampu LED TL Phillips 2 Buah Rp 36,390.00
Pemasangan Lampu Taman 2 Buah Rp 36,390.00
Total Anggaran Biaya

Tenaga Kerja Satuan Jumlah Kebutuhan


2 3 4
Tukang Listrik Oh 31.2
Kepala Tukang Listrik Oh 3.12
TOTAL

Bahan Satuan Jumlah Kebutuhan


2 3 4
Pipa Listrik 5/8" Batang 306
Kabel Prima NYM 3x2,5 m' 1530
T dus Buah 102
L Bow Buah 6
Klem Buah 744
MCB Domae 1 Phase 25A Buah 1
Saklar Tunggal Broco Buah 11
Saklar Ganda Broco Buah 13
Saklar Hotel Pieno E8231L2F Buah 2
Stop Kontak Broco Buah 27
Stop Kontak AC Panasonic Buah 7
Stop Kontak Waterproof Panasonic Buah 4
Stop Kontak Antena TV Broco Buah 4
Stop Kontak Telepon Broco Buah 3
Kotak Pembagi (Distributor Point) Buah 2
Las Doof Buah 84
Lampu Downlight Panasonic 4 Inch Buah 26
Fitting Buah 26
Lampu LED TL Phillips Buah 2
Kap Lampu Buah 2
Lampu Taman + Tiang Buah 2
TOTAL
RENCANA ANGGARAN BIAYA PEKERJAAN ELEKTRIKAL

HARGA SATUAN JUMLAH HARGA TOTAL HARGA


BAHAN UPAH BAHAN (UPAH+BAHAN)
6 7 = (3x5) 8 = (3x6) 9 = (7+8)
Rp 247,650.00 Rp 36,390.00 Rp 247,650.00 Rp 284,040.00
Rp 198,750.00 Rp 400,290.00 Rp 2,186,250.00 Rp 2,586,540.00
Rp 201,250.00 Rp 473,070.00 Rp 2,616,250.00 Rp 3,089,320.00
Rp 209,650.00 Rp 72,780.00 Rp 419,300.00 Rp 492,080.00
Rp 198,750.00 Rp 982,530.00 Rp 5,366,250.00 Rp 6,348,780.00
Rp 218,550.00 Rp 254,730.00 Rp 1,529,850.00 Rp 1,784,580.00
Rp 225,750.00 Rp 145,560.00 Rp 903,000.00 Rp 1,048,560.00
Rp 221,750.00 Rp 145,560.00 Rp 887,000.00 Rp 1,032,560.00
Rp 218,750.00 Rp 109,170.00 Rp 656,250.00 Rp 765,420.00
Rp 253,250.00 Rp 72,780.00 Rp 506,500.00 Rp 579,280.00
Rp 258,450.00 Rp 946,140.00 Rp 6,719,700.00 Rp 7,665,840.00
Rp 284,950.00 Rp 72,780.00 Rp 569,900.00 Rp 642,680.00
Rp 214,025.00 Rp 72,780.00 Rp 428,050.00 Rp 500,830.00
Rp 3,784,560.00 Rp 23,035,950.00 Rp 26,820,510.00

Harga Satuan (Rp) Biaya Upah


5 6 = (4 x 5)
Rp 109,300.00 Rp 3,410,160.00
Rp 120,000.00 Rp 374,400.00
Rp 3,784,560.00

Harga Satuan (Rp) Biaya Bahan


5 6 = (4 x 5)
Rp 5,250.00 Rp 1,606,500.00
Rp 10,800.00 Rp 16,524,000.00
Rp 6,000.00 Rp 612,000.00
Rp 1,100.00 Rp 6,600.00
Rp 200.00 Rp 148,800.00
Rp 56,900.00 Rp 56,900.00
Rp 15,000.00 Rp 165,000.00
Rp 17,500.00 Rp 227,500.00
Rp 25,900.00 Rp 51,800.00
Rp 15,000.00 Rp 405,000.00
Rp 34,800.00 Rp 243,600.00
Rp 42,000.00 Rp 168,000.00
Rp 38,000.00 Rp 152,000.00
Rp 35,000.00 Rp 105,000.00
Rp 62,500.00 Rp 125,000.00
Rp 300.00 Rp 25,200.00
Rp 54,000.00 Rp 1,404,000.00
Rp 15,000.00 Rp 390,000.00
Rp 73,000.00 Rp 146,000.00
Rp 22,500.00 Rp 45,000.00
Rp 214,025.00 Rp 428,050.00
Rp 23,035,950.00
NO URAIAN KOEF SAT

1 2 3 4
K PEKERJAAN
K.1 Pemasangan 1 Buah Closet Duduk
Pekerja 3.3 Oh
Tukang Batu 1.1 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.16 Oh
Closet Duduk Warna Toto 1 Unit
Perlengkapan (6% dari bahan) 1 %
JUMLAH
K.2 Pemasangan 1 Buah Closet Jongkok
Pekerja 1 Oh
Tukang Batu 1.5 Oh
Kepala Tukang Batu 0.15 Oh
Mandor 0.16 Oh
Closet Jongkok Putih INA 1 Unit
Semen Portland 6 Kg
Pasir Pasang 0.01 m3
JUMLAH
K.3 Pemasangan 1 Buah Wastafel
Pekerja 1.2 Oh
Tukang Batu 1.45 Oh
Kepala Tukang Batu 0.15 Oh
Mandor 0.06 Oh
Wastafel Toto L 521V1A 1.2 Unit
Semen Portland 6 Kg
Pasir Pasang 0.01 m3
Perlengkapan (12% dari bahan) 1 %
JUMLAH
K.4 Pemasangan 1 Buah Bathtube
Pekerja 0.075 Oh
Tukang Batu 0.75 Oh
Kepala Tukang Batu 0.075 Oh
Mandor 0.003 Oh
Bathtube 1 Unit
Perlengkapan (20% dari bahan) 1 %
JUMLAH
K.5 Pemasangan 1 Buah Bak Mandi Teraso Volume 0,3 m3
Pekerja 3 Oh
Tukang Batu 4.5 Oh
Kepala Tukang Batu 0.05 Oh
Mandor 0.9 Oh
Bak Mandi Fiberglass 1 Unit
Perlengkapan (12% dari bahan) 1 %
JUMLAH
K.6 Pemasangan 1 Buah Bak Cuci Piring Stainlessteel
Pekerja 0.03 Oh
Tukang Batu 0.3 Oh
Kepala Tukang Batu 0.03 Oh
Mandor 0.015 Oh
Bak Cuci Piring 1 Unit
Waterdrain 1 Buah
JUMLAH
K.7 Pemasangan 1 Buah Floor Drain
Pekerja 0.01 Oh
Tukang Batu 0.1 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.005 Oh
Floor Drain 1 Unit
JUMLAH
K.8 Pemasangan 1 BuahJet Washer Closet
Pekerja 0.01 Oh
Tukang Batu 0.1 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.005 Oh
Jet Washer Closet 1 Unit
JUMLAH
K.9 Pemasangan 1 Buah Tandon Air
Pekerja 3 Oh
Tukang Batu 4.5 Oh
Kepala Tukang Batu 0.9 Oh
Mandor 0.9 Oh
Tandon Air 1000L 1 buah
Perlengkapan Tandon Air (12% dari Bahan) 1 %
JUMLAH
K.10 Pemasangan 1 Buah Kran Air Diameter 1/2" atau 3/4"
Pekerja 0.01 Oh
Tukang Batu 0.1 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.005 Oh
Kran Air 1 Buah
Seal Tape 0.025 Buah
JUMLAH
K.11 Pemasangan 1 Buah Jet Shower
Pekerja 0.12 Oh
Tukang Batu 1.6 Oh
Kepala Tukang Batu 0.002 Oh
Mandor 0.0001 Oh
Jet Shower 1 Buah
Perlengkapan 1 Set
JUMLAH
K.12 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1"
Pekerja 0.036 Oh
Tukang Batu 0.06 Oh
Kepala Tukang Batu 0.006 Oh
Mandor 0.002 Oh
Pipa PVC 1" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.13 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1/2"
Pekerja 0.036 Oh
Tukang Batu 0.06 Oh
Kepala Tukang Batu 0.006 Oh
Mandor 0.002 Oh
Pipa PVC 1/2" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.14 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3/4"
Pekerja 0.036 Oh
Tukang Batu 0.06 Oh
Kepala Tukang Batu 0.006 Oh
Mandor 0.002 Oh
Pipa PVC 3/4 " Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.15 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1 1/4 "
Pekerja 0.054 Oh
Tukang Batu 0.09 Oh
Kepala Tukang Batu 0.009 Oh
Mandor 0.003 Oh
Pipa PVC 1 1/4" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.16 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 2"
Pekerja 0.054 Oh
Tukang Batu 0.09 Oh
Kepala Tukang Batu 0.009 Oh
Mandor 0.003 Oh
Pipa PVC 2" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.17 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3"
Pekerja 0.081 Oh
Tukang Batu 0.135 Oh
Kepala Tukang Batu 0.0135 Oh
Mandor 0.004 Oh
Pipa PVC 3" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.18 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 4"
Pekerja 0.081 Oh
Tukang Batu 0.135 Oh
Kepala Tukang Batu 0.0135 Oh
Mandor 0.004 Oh
Pipa PVC 4" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.19 Pemasangan 1 Buah Bak Kontrol Pas. Bata 60 cm x 60 cm x 65 cm
Pekerja 3.2 Oh
Tukang Batu 1.15 Oh
Kepala Tukang Batu 0.011 Oh
Mandor 0.016 Oh
Bata Merah 123 Buah
Semen Portland 114 Kg
Pasir Pasang 0.184 m3
Pasir Beton 0.12 m3
Kerikil 0.033 m3
Baja Tulangan 4.85 Kg
JUMLAH
K.20 Pemasangan 1 Buah Septictank 2x1.5x2 m
Pekerja 2.16 Oh
Tukang Batu 0.72 Oh
Kepala Tukang Batu 0.072 Oh
Mandor 0.011 Oh
Semen Portland 114 kg
Pasir Pasang 0.184 m3
Bata Merah 30.446 bh
Pipa PVC 4" 9 m
Baja Tulangan 4.85 Kg
Pasir Beton 0.12 m3
Batu Split Pecah Mesin 1/2 0.033 m3
Galian Tanah 4.5 m3
Pipa GIP 1.5 1.2 m3
Galian Tanah untuk Rembesan 2.25 m2
Kerikil 1.05 m3
Pas. Ijuk 5.4 m2
Urugan Kembali/Perataan Tanah 1.13 m3
Plat Penutup Beton 0.3 m3
JUMLAH
Harga Satuan (Rp) Jumlah Harga (Rp)
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)
PEKERJAAN SANITASI

Rp 95,600.00 - - Rp 315,480.00 - -
Rp 109,300.00 - - Rp 120,230.00 - -
Rp 120,000.00 - - Rp 1,200.00 - -
Rp 131,000.00 - - Rp 20,960.00 - -
- Rp 2,085,000.00 - - Rp 2,085,000.00 -
- Rp 125,100.00 - - Rp 125,100.00 -
H Rp 457,870.00 Rp 2,210,100.00 -

Rp 95,600.00 - - Rp 95,600.00 - -
Rp 109,300.00 - - Rp 163,950.00 - -
Rp 120,000.00 - - Rp 18,000.00 - -
Rp 131,000.00 - - Rp 20,960.00 - -
- Rp 151,250.00 - - Rp 151,250.00 -
- Rp 1,100.00 - - Rp 6,600.00 -
- Rp 224,500.00 - - Rp 2,245.00 -
H Rp 298,510.00 Rp 160,095.00 -

Rp 95,600.00 - - Rp 114,720.00 - -
Rp 109,300.00 - - Rp 158,485.00 - -
Rp 120,000.00 - - Rp 18,000.00 - -
Rp 131,000.00 - - Rp 7,860.00 - -
- Rp 2,602,000.00 - - Rp 3,122,400.00 -
- Rp 1,100.00 - - Rp 6,600.00 -
- Rp 224,500.00 - - Rp 2,245.00 -
- Rp 312,240.00 - - Rp 312,240.00 -
H Rp 299,065.00 Rp 3,443,485.00 -

Rp 95,600.00 - - Rp 7,170.00 - -
Rp 109,300.00 - - Rp 81,975.00 - -
Rp 120,000.00 - - Rp 9,000.00 - -
Rp 131,000.00 - - Rp 393.00 - -
- Rp 2,500,000.00 - - Rp 2,500,000.00 -
- Rp 500,000.00 - - Rp 500,000.00 -
H Rp 98,538.00 Rp 3,000,000.00 -

Rp 95,600.00 - - Rp 286,800.00 - -
Rp 109,300.00 - - Rp 491,850.00 - -
Rp 120,000.00 - - Rp 6,000.00 - -
Rp 131,000.00 - - Rp 117,900.00 - -
- Rp 500,000.00 - - Rp 500,000.00 -
- Rp 60,000.00 - - Rp 60,000.00 -
H Rp 902,550.00 Rp 560,000.00 -

Rp 95,600.00 - - Rp 2,868.00 - -
Rp 109,300.00 - - Rp 32,790.00 - -
Rp 120,000.00 - - Rp 3,600.00 - -
Rp 131,000.00 - - Rp 1,965.00 - -
- Rp 195,400.00 - - Rp 195,400.00 -
- Rp 100,000.00 - - Rp 100,000.00 -
H Rp 41,223.00 Rp 295,400.00 -

Rp 95,600.00 - - Rp 956.00 - -
Rp 109,300.00 - - Rp 10,930.00 - -
Rp 120,000.00 - - Rp 1,200.00 - -
Rp 131,000.00 - - Rp 655.00 - -
- Rp 280,000.00 - - Rp 280,000.00 -
H Rp 13,741.00 Rp 280,000.00 -

Rp 95,600.00 - - Rp 956.00 - -
Rp 109,300.00 - - Rp 10,930.00 - -
Rp 120,000.00 - - Rp 1,200.00 - -
Rp 131,000.00 - - Rp 655.00 - -
- Rp 94,000.00 - - Rp 94,000.00 -
H Rp 13,741.00 Rp 94,000.00 -

Rp 95,600.00 - - Rp 286,800.00 - -
Rp 109,300.00 - - Rp 491,850.00 - -
Rp 120,000.00 - - Rp 108,000.00 - -
Rp 131,000.00 - - Rp 117,900.00 - -
- Rp 1,200,000.00 - - Rp 1,200,000.00 -
- Rp 144,000.00 - - Rp 144,000.00 -
H Rp 1,004,550.00 Rp 1,344,000.00 -

Rp 95,600.00 - - Rp 956.00 - -
Rp 109,300.00 - - Rp 10,930.00 - -
Rp 120,000.00 - - Rp 1,200.00 - -
Rp 131,000.00 - - Rp 655.00 - -
- Rp 176,000.00 - - Rp 176,000.00 -
- Rp 60,000.00 - - Rp 1,500.00 -
H Rp 13,741.00 Rp 177,500.00 -
Rp 95,600.00 - - Rp 11,472.00 - -
Rp 109,300.00 - - Rp 174,880.00 - -
Rp 120,000.00 - - Rp 240.00 - -
Rp 131,000.00 - - Rp 13.10 - -
- Rp 94,000.00 - - Rp 94,000.00 -
- Rp 80,000.00 - - Rp 80,000.00 -
H Rp 186,605.10 Rp 174,000.00 -

Rp 95,600.00 - - Rp 3,441.60 - -
Rp 109,300.00 - - Rp 6,558.00 - -
Rp 120,000.00 - - Rp 720.00 - -
Rp 131,000.00 - - Rp 262.00 - -
- Rp 14,125.00 - - Rp 16,950.00 -
- Rp 4,943.75 - - Rp 4,943.75 -
H Rp 10,981.60 Rp 21,893.75 -

Rp 95,600.00 - - Rp 3,441.60 - -
Rp 109,300.00 - - Rp 6,558.00 - -
Rp 120,000.00 - - Rp 720.00 - -
Rp 131,000.00 - - Rp 262.00 - -
- Rp 8,125.00 - - Rp 9,750.00 -
- Rp 2,843.75 - - Rp 2,843.75 -
H Rp 10,981.60 Rp 12,593.75 -

Rp 95,600.00 - - Rp 3,441.60 - -
Rp 109,300.00 - - Rp 6,558.00 - -
Rp 120,000.00 - - Rp 720.00 - -
Rp 131,000.00 - - Rp 262.00 - -
- Rp 10,000.00 - - Rp 12,000.00 -
- Rp 3,500.00 - - Rp 3,500.00 -
H Rp 10,981.60 Rp 15,500.00 -

Rp 95,600.00 - - Rp 5,162.40 - -
Rp 109,300.00 - - Rp 9,837.00 - -
Rp 120,000.00 - - Rp 1,080.00 - -
Rp 131,000.00 - - Rp 393.00 - -
- Rp 16,250.00 - - Rp 19,500.00 -
- Rp 5,687.50 - - Rp 5,687.50 -
H Rp 16,472.40 Rp 25,187.50 -

Rp 95,600.00 - - Rp 5,162.40 - -
Rp 109,300.00 - - Rp 9,837.00 - -
Rp 120,000.00 - - Rp 1,080.00 - -
Rp 131,000.00 - - Rp 393.00 - -
- Rp 38,500.00 - - Rp 46,200.00 -
- Rp 13,475.00 - - Rp 13,475.00 -
H Rp 16,472.40 Rp 59,675.00 -

Rp 95,600.00 - - Rp 7,743.60 - -
Rp 109,300.00 - - Rp 14,755.50 - -
Rp 120,000.00 - - Rp 1,620.00 - -
Rp 131,000.00 - - Rp 524.00 - -
- Rp 58,750.00 - - Rp 70,500.00 -
- Rp 20,562.50 - - Rp 20,562.50 -
H Rp 24,643.10 Rp 91,062.50 -

Rp 95,600.00 - - Rp 7,743.60 - -
Rp 109,300.00 - - Rp 14,755.50 - -
Rp 120,000.00 - - Rp 1,620.00 - -
Rp 131,000.00 - - Rp 524.00 - -
- Rp 95,000.00 - - Rp 114,000.00 -
- Rp 33,250.00 - - Rp 33,250.00 -
H Rp 24,643.10 Rp 147,250.00 -
m x 65 cm
Rp 95,600.00 - - Rp 305,920.00 - -
Rp 109,300.00 - - Rp 125,695.00 - -
Rp 120,000.00 - - Rp 1,320.00 - -
Rp 131,000.00 - - Rp 2,096.00 - -
- Rp 700.00 - - Rp 86,100.00 -
- Rp 1,100.00 - - Rp 125,400.00 -
- Rp 224,500.00 - - Rp 41,308.00 -
- Rp 250,000.00 - - Rp 30,000.00 -
- Rp 250,000.00 - - Rp 8,250.00 -
- Rp 12,000.00 - - Rp 58,200.00 -
H Rp 435,031.00 Rp 349,258.00 -

Rp 95,600.00 - - Rp 206,496.00 - -
Rp 109,300.00 - - Rp 78,696.00 - -
Rp 120,000.00 - - Rp 8,640.00 - -
Rp 131,000.00 - - Rp 1,441.00 - -
- Rp 1,100.00 - - Rp 125,400.00 -
- Rp 224,500.00 - - Rp 41,308.00 -
- Rp 700.00 - - Rp 21,312.20 -
- Rp 95,000.00 - - Rp 855,000.00 -
- Rp 12,000.00 - - Rp 58,200.00 -
- Rp 250,000.00 - - Rp 30,000.00 -
- Rp 250,000.00 - - Rp 8,250.00 -
- Rp 70,000.00 - - Rp 315,000.00 -
- Rp 75,000.00 - - Rp 90,000.00 -
- Rp 56,814.00 - - Rp 127,831.50 -
- Rp 250,000.00 - - Rp 262,500.00 -
- Rp 250,000.00 - - Rp 1,350,000.00 -
- Rp 50,000.00 - - Rp 56,500.00 -
- Rp 2,537,064.00 - - Rp 761,119.20 -
H Rp 295,273.00 Rp 4,102,420.90 -
Jumlah (Rp) No Uraian Pekerjaan

11 = ( 8+9+10) 1 2
K
K.1 Pemasangan 1 Buah Closet Duduk
Rp 315,480.00 Pekerja
Rp 120,230.00 Tukang Batu
Rp 1,200.00 Kepala Tukang Batu
Rp 20,960.00 Mandor
Rp 2,085,000.00 Closet Duduk Warna Toto
Rp 125,100.00 Perlengkapan (6% dari bahan)
Rp 2,667,970.00

Rp 95,600.00
No Uraian Pekerjaan
Rp 163,950.00
Rp 18,000.00 1 2
Rp 20,960.00 K.2 Pemasangan 1 Buah Closet Jongkok
Rp 151,250.00 Pekerja
Rp 6,600.00 Tukang Batu
Rp 2,245.00 Kepala Tukang Batu
Rp 458,605.00 Mandor
Closet Jongkok Putih INA
Rp 114,720.00 Semen Portland
Rp 158,485.00 Pasir Pasang
Rp 18,000.00
Rp 7,860.00
Rp 3,122,400.00
No Uraian Pekerjaan
Rp 6,600.00
Rp 2,245.00 1 2
Rp 312,240.00 K.3 Pemasangan 1 Buah Wastafel
Rp 3,742,550.00 Pekerja
Tukang Batu
Rp 7,170.00 Kepala Tukang Batu
Rp 81,975.00 Mandor
Rp 9,000.00 Wastafel Toto L 521V1A
Rp 393.00 Semen Portland
Rp 2,500,000.00 Pasir Pasang
Rp 500,000.00 Perlengkapan (12% dari bahan)
Rp 3,098,538.00

Rp 286,800.00
No Uraian Pekerjaan
Rp 491,850.00
Rp 6,000.00 1 2
Rp 117,900.00 K.4 Pemasangan 1 Buah Bathtube
Rp 500,000.00 Pekerja
Rp 60,000.00 Tukang Batu
Rp 1,462,550.00 Kepala Tukang Batu
Mandor
Rp 2,868.00 Bathtube
Rp 32,790.00 Perlengkapan (20% dari bahan)
Rp 3,600.00
Rp 1,965.00
Rp 195,400.00
No Uraian Pekerjaan
Rp 100,000.00
Rp 336,623.00 1 2
K.5 Pemasangan 1 Buah Bak Mandi Teraso Volume 0,3 m3
Rp 956.00 Pekerja
Rp 10,930.00 Tukang Batu
Rp 1,200.00 Kepala Tukang Batu
Rp 655.00 Mandor
Rp 280,000.00 Bak Mandi Fiberglass
Rp 293,741.00 Perlengkapan (12% dari bahan)

Rp 956.00
Rp 10,930.00
No Uraian Pekerjaan
Rp 1,200.00
Rp 655.00 1 2
Rp 94,000.00 K.6 Pemasangan 1 Buah Bak Cuci Piring Stainlessteel
Rp 107,741.00 Pekerja
Tukang Batu
Rp 286,800.00 Kepala Tukang Batu
Rp 491,850.00 Mandor
Rp 108,000.00 Bak Cuci Piring
Rp 117,900.00 Waterdrain
Rp 1,200,000.00
Rp 144,000.00
Rp 2,348,550.00
No Uraian Pekerjaan
Rp 956.00 1 2
Rp 10,930.00 K.7 Pemasangan 1 Buah Floor Drain
Rp 1,200.00 Pekerja
Rp 655.00 Tukang Batu
Rp 176,000.00 Kepala Tukang Batu
Rp 1,500.00 Mandor
Rp 191,241.00 Floor Drain
Rp 11,472.00
Rp 174,880.00
No Uraian Pekerjaan
Rp 240.00
Rp 13.10 1 2
Rp 94,000.00 K.8 Pemasangan 1 Buah Jet Washer Closet
Rp 80,000.00 Pekerja
Rp 360,605.10 Tukang Batu
Kepala Tukang Batu
Rp 3,441.60 Mandor
Rp 6,558.00 Jet Washer Closet
Rp 720.00
Rp 262.00
Rp 16,950.00
No Uraian Pekerjaan
Rp 4,943.75
Rp 32,875.35 1 2
K.9 Pemasangan 1 Buah Tandon Air
Rp 3,441.60 Pekerja
Rp 6,558.00 Tukang Batu
Rp 720.00 Kepala Tukang Batu
Rp 262.00 Mandor
Rp 9,750.00 Tandon Air 1000L
Rp 2,843.75 Perlengkapan Tandon Air
Rp 23,575.35

Rp 3,441.60
No Uraian Pekerjaan
Rp 6,558.00
Rp 720.00 1 2
Rp 262.00 K.10 Pemasangan 1 Buah Kran Air Diameter 1/2" atau 3/4"
Rp 12,000.00 Pekerja
Rp 3,500.00 Tukang Batu
Rp 26,481.60 Kepala Tukang Batu
Mandor
Rp 5,162.40 Kran Air
Rp 9,837.00 Seal Tape
Rp 1,080.00
Rp 393.00
Rp 19,500.00
No Uraian Pekerjaan
Rp 5,687.50
Rp 41,659.90 1 2
K.11 Pemasangan 1 Buah Jet Shower
Rp 5,162.40 Pekerja
Rp 9,837.00 Tukang Batu
Rp 1,080.00 Kepala Tukang Batu
Rp 393.00 Mandor
Rp 46,200.00 Jet Shower
Rp 13,475.00 Perlengkapan
Rp 76,147.40

Rp 7,743.60
No Uraian Pekerjaan
Rp 14,755.50
Rp 1,620.00 1 2
Rp 524.00 K.12 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1"
Rp 70,500.00 Pekerja
Rp 20,562.50 Tukang Batu
Rp 115,705.60 Kepala Tukang Batu
Mandor
Rp 7,743.60 Pipa PVC 1" Rucika
Rp 14,755.50 Perlengkapan (35% dari bahan)
Rp 1,620.00
Rp 524.00
Rp 114,000.00
No Uraian Pekerjaan
Rp 33,250.00
Rp 171,893.10 1 2
K.13 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1/2"
Rp 305,920.00 Pekerja
Rp 125,695.00 Tukang Batu
Rp 1,320.00 Kepala Tukang Batu
Rp 2,096.00 Mandor
Rp 86,100.00 Pipa PVC 1/2" Rucika
Rp 125,400.00 Perlengkapan (35% dari bahan)
Rp 41,308.00
Rp 30,000.00
Rp 8,250.00
No Uraian Pekerjaan
Rp 58,200.00
Rp 784,289.00 1 2
K.14 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3/4"
Rp 206,496.00 Pekerja
Rp 78,696.00 Tukang Batu
Rp 8,640.00 Kepala Tukang Batu
Rp 1,441.00 Mandor
Rp 125,400.00 Pipa PVC 3/4 " Rucika
Rp 41,308.00 Perlengkapan (35% dari bahan)
Rp 21,312.20
Rp 855,000.00
Rp 58,200.00
No Uraian Pekerjaan
No Uraian Pekerjaan
Rp 30,000.00
Rp 8,250.00 1 2
Rp 315,000.00 K.15 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1 1/4 "
Rp 90,000.00 Pekerja
Rp 127,831.50 Tukang Batu
Rp 262,500.00 Kepala Tukang Batu
Rp 1,350,000.00 Mandor
Rp 56,500.00 Pipa PVC 1 1/4" Rucika
Rp 761,119.20 Perlengkapan (35% dari bahan)
Rp 4,397,693.90

No Uraian Pekerjaan
1 2
K.16 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 2"
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Pipa PVC 2" Rucika
Perlengkapan (35% dari bahan)

No Uraian Pekerjaan
1 2
K.17 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3"
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Pipa PVC 3" Rucika
Perlengkapan (35% dari bahan)

No Uraian Pekerjaan
1 2
K.18 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 4"
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Pipa PVC 4" Rucika
Perlengkapan (35% dari bahan)

No Uraian Pekerjaan
1 2
K.19 Pemasangan 1 Buah Bak Kontrol Pas. Bata 60 cm x 60 cm x 65 cm
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Bata Merah
Semen Portland
Pasir Pasang
Pasir Beton
Kerikil
Baja Tulangan

No Uraian Pekerjaan
1 2
K.20 Pemasangan 1 Buah Septictank 2x1.5x2 m
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Pasang
Bata Merah
Pipa PVC 4"
Baja Tulangan
Pasir Beton
Batu Split Pecah Mesin 1/2
Galian Tanah
Pipa GIP 1.5
Galian Tanah untuk Rembesan
Kerikil
Pas. Ijuk
Urugan Kembali/Perataan Tanah
Plat Penutup Beton
Harga Satuan (Rp)
an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
PEKERJAAN SANITASI
4 - Buah
3.3 Oh Rp 95,600.00 -
1.1 Oh Rp 109,300.00 -
0.01 Oh Rp 120,000.00 -
0.16 Oh Rp 131,000.00 -
1 Unit - Rp 2,085,000.00
1 % - Rp 125,100.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
1 - Buah
1 Oh Rp 95,600.00 -
1.5 Oh Rp 109,300.00 -
0.15 Oh Rp 120,000.00 -
0.16 Oh Rp 131,000.00 -
1 Unit - Rp 151,250.00
6 Kg - Rp 1,100.00
0.01 m3 - Rp 224,500.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
4 - Buah
1.2 Oh Rp 95,600.00 -
1.45 Oh Rp 109,300.00 -
0.15 Oh Rp 120,000.00 -
0.06 Oh Rp 131,000.00 -
1.2 Unit - Rp 2,602,000.00
6 Kg - Rp 1,100.00
0.01 m3 - Rp 224,500.00
1 % - Rp 312,240.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
2 - Buah
0.075 Oh Rp 95,600.00 -
0.75 Oh Rp 109,300.00 -
0.075 Oh Rp 120,000.00 -
0.003 Oh Rp 131,000.00 -
1 Unit - Rp 2,500,000.00
1 % - Rp 500,000.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
so Volume 0,3 m3 1 - Buah
3 Oh Rp 95,600.00 -
4.5 Oh Rp 109,300.00 -
0.05 Oh Rp 120,000.00 -
0.9 Oh Rp 131,000.00 -
1 Unit - Rp 500,000.00
1 % - Rp 60,000.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
Stainlessteel 1 - Buah
0.03 Oh Rp 95,600.00 -
0.3 Oh Rp 109,300.00 -
0.03 Oh Rp 120,000.00 -
0.015 Oh Rp 131,000.00 -
1 Unit - Rp 195,400.00
1 Buah - Rp 100,000.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
5 - Buah
0.01 Oh Rp 95,600.00 -
0.1 Oh Rp 109,300.00 -
0.01 Oh Rp 120,000.00 -
0.005 Oh Rp 131,000.00 -
1 Unit - Rp 280,000.00
Harga Satuan (Rp)
an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
et 4 - Buah
0.01 Oh Rp 95,600.00 -
0.1 Oh Rp 109,300.00 -
0.01 Oh Rp 120,000.00 -
0.005 Oh Rp 131,000.00 -
1 Unit - Rp 94,000.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
1 - Buah
3 Oh Rp 95,600.00 -
4.5 Oh Rp 109,300.00 -
0.9 Oh Rp 120,000.00 -
0.9 Oh Rp 131,000.00 -
1 buah - Rp 1,200,000.00
1 % - Rp 144,000.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
ter 1/2" atau 3/4" 5 - Buah
0.01 Oh Rp 95,600.00 -
0.1 Oh Rp 109,300.00 -
0.01 Oh Rp 120,000.00 -
0.005 Oh Rp 131,000.00 -
1 Buah - Rp 176,000.00
0.025 Buah - Rp 60,000.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
2 - Buah
0.12 Oh Rp 95,600.00 -
1.6 Oh Rp 109,300.00 -
0.002 Oh Rp 120,000.00 -
0.0001 Oh Rp 131,000.00 -
1 Buah - Rp 94,000.00
1 Set - Rp 80,000.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
W Diameter 1" 34.887 - m
0.036 Oh Rp 95,600.00 -
0.06 Oh Rp 109,300.00 -
0.006 Oh Rp 120,000.00 -
0.002 Oh Rp 131,000.00 -
1.2 m' - Rp 14,125.00
1 % - Rp 4,943.75

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
W Diameter 1/2" 38.272 - m
0.036 Oh Rp 95,600.00 -
0.06 Oh Rp 109,300.00 -
0.006 Oh Rp 120,000.00 -
0.002 Oh Rp 131,000.00 -
1.2 m' - Rp 8,125.00
1 % - Rp 2,843.75

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
W Diameter 3/4" 59.537 - m
0.036 Oh Rp 95,600.00 -
0.06 Oh Rp 109,300.00 -
0.006 Oh Rp 120,000.00 -
0.002 Oh Rp 131,000.00 -
1.2 m' - Rp 10,000.00
1 % - Rp 3,500.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
W Diameter 1 1/4 " 25.363 - m
0.054 Oh Rp 95,600.00 -
0.09 Oh Rp 109,300.00 -
0.009 Oh Rp 120,000.00 -
0.003 Oh Rp 131,000.00 -
1.2 m' - Rp 16,250.00
1 % - Rp 5,687.50

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
W Diameter 2" 26.207 - m
0.054 Oh Rp 95,600.00 -
0.09 Oh Rp 109,300.00 -
0.009 Oh Rp 120,000.00 -
0.003 Oh Rp 131,000.00 -
1.2 m' - Rp 38,500.00
1 % - Rp 13,475.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
W Diameter 3" 48.805 - m
0.081 Oh Rp 95,600.00 -
0.135 Oh Rp 109,300.00 -
0.0135 Oh Rp 120,000.00 -
0.004 Oh Rp 131,000.00 -
1.2 m' - Rp 58,750.00
1 % - Rp 20,562.50

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
W Diameter 4" 61.148 - m
0.081 Oh Rp 95,600.00 -
0.135 Oh Rp 109,300.00 -
0.0135 Oh Rp 120,000.00 -
0.004 Oh Rp 131,000.00 -
1.2 m' - Rp 95,000.00
1 % - Rp 33,250.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
s. Bata 60 cm x 60 cm x 65 cm 4 - Buah
3.2 Oh Rp 95,600.00 -
1.15 Oh Rp 109,300.00 -
0.011 Oh Rp 120,000.00 -
0.016 Oh Rp 131,000.00 -
123 Buah - Rp 700.00
114 Kg - Rp 1,100.00
0.184 m3 - Rp 224,500.00
0.12 m3 - Rp 250,000.00
0.033 m3 - Rp 250,000.00
4.85 Kg - Rp 12,000.00

Harga Satuan (Rp)


an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
5x2 m 1 - Buah
2.16 Oh Rp 95,600.00 -
0.72 Oh Rp 109,300.00 -
0.072 Oh Rp 120,000.00 -
0.011 Oh Rp 131,000.00 -
114 kg - Rp 1,100.00
0.184 m3 - Rp 224,500.00
30.446 bh - Rp 700.00
9 m - Rp 95,000.00
4.85 Kg - Rp 12,000.00
0.12 m3 - Rp 250,000.00
0.033 m3 - Rp 250,000.00
4.5 m3 - Rp 70,000.00
1.2 m3 - Rp 75,000.00
2.25 m2 - Rp 56,814.00
1.05 m3 - Rp 250,000.00
5.4 m2 - Rp 250,000.00
1.13 m3 - Rp 50,000.00
0.3 m3 - Rp 2,537,064.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
ASI

- 13.2 - - Rp 1,261,920.00 -
- 4.4 - - Rp 480,920.00 -
- 0.04 - - Rp 4,800.00 -
- 0.64 - - Rp 83,840.00 -
- - 4 - - Rp 8,340,000.00
- - 4 - - Rp 500,400.00
Jumlah Rp 1,831,480.00 Rp 8,840,400.00
Total Rp 10,671,880.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 1 - - Rp 95,600.00 -
- 1.5 - - Rp 163,950.00 -
- 0.15 - - Rp 18,000.00 -
- 0.16 - - Rp 20,960.00 -
- - 1 - - Rp 151,250.00
- - 6 - - Rp 6,600.00
- - 0.01 - - Rp 2,245.00
Jumlah Rp 298,510.00 Rp 160,095.00
Total Rp 458,605.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 4.8 - - Rp 458,880.00 -
- 5.8 - - Rp 633,940.00 -
- 0.6 - - Rp 72,000.00 -
- 0.24 - - Rp 31,440.00 -
- - 4.8 - - Rp 12,489,600.00
- - 24 - - Rp 26,400.00
- - 0.04 - - Rp 8,980.00
- - 4 - - Rp 1,248,960.00
Jumlah Rp 1,196,260.00 Rp 13,773,940.00
Total Rp 14,970,200.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 0.15 - - Rp 14,340.00 -
- 1.5 - - Rp 163,950.00 -
- 0.15 - - Rp 18,000.00 -
- 0.006 - - Rp 786.00 -
- - 2 - - Rp 5,000,000.00
- - 2 - - Rp 1,000,000.00
Jumlah Rp 197,076.00 Rp 6,000,000.00
Total Rp 6,197,076.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 3 - - Rp 286,800.00 -
- 4.5 - - Rp 491,850.00 -
- 0.05 - - Rp 6,000.00 -
- 0.9 - - Rp 117,900.00 -
- - 1 - - Rp 500,000.00
- - 1 - - Rp 60,000.00
Jumlah Rp 902,550.00 Rp 560,000.00
Total Rp 1,462,550.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 0.03 - - Rp 2,868.00 -
- 0.3 - - Rp 32,790.00 -
- 0.03 - - Rp 3,600.00 -
- 0.015 - - Rp 1,965.00 -
- - 1 - - Rp 195,400.00
- - 1 - - Rp 100,000.00
Jumlah Rp 41,223.00 Rp 295,400.00
Total Rp 336,623.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 0.05 - - Rp 4,780.00 -
- 0.5 - - Rp 54,650.00 -
- 0.05 - - Rp 6,000.00 -
- 0.025 - - Rp 3,275.00 -
- - 5 - - Rp 1,400,000.00
Jumlah Rp 68,705.00 Rp 1,400,000.00
Total Rp 1,468,705.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 0.04 - - Rp 3,824.00 -
- 0.4 - - Rp 43,720.00 -
- 0.04 - - Rp 4,800.00 -
- 0.02 - - Rp 2,620.00 -
- - 4 - - Rp 376,000.00
Jumlah Rp 54,964.00 Rp 376,000.00
Total Rp 430,964.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 3 - - Rp 286,800.00 -
- 4.5 - - Rp 491,850.00 -
- 0.9 - - Rp 108,000.00 -
- 0.9 - - Rp 117,900.00 -
- - 1 - - Rp 1,200,000.00
- - 1 - - Rp 144,000.00
Jumlah Rp 1,004,550.00 Rp 1,344,000.00
Total Rp 2,348,550.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 0.05 - - Rp 4,780.00 -
- 0.5 - - Rp 54,650.00 -
- 0.05 - - Rp 6,000.00 -
- 0.025 - - Rp 3,275.00 -
- - 5 - - Rp 880,000.00
- - 0.125 - - Rp 7,500.00
Jumlah Rp 68,705.00 Rp 887,500.00
Total Rp 956,205.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 0.24 - - Rp 22,944.00 -
- 3.2 - - Rp 349,760.00 -
- 0.004 - - Rp 480.00 -
- 0.0002 - - Rp 26.20 -
- - 2 - - Rp 188,000.00
- - 2 - - Rp 160,000.00
Jumlah Rp 373,210.20 Rp 348,000.00
Total Rp 721,210.20
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 1.255932 - - Rp 120,067.10 -
- 2.09322 - - Rp 228,788.95 -
- 0.209322 - - Rp 25,118.64 -
- 0.069774 - - Rp 9,140.39 -
- - 41.8644 - - Rp 591,334.65
- - 34.887 - - Rp 172,472.61
Jumlah Rp 383,115.08 Rp 763,807.26
Total Rp 1,146,922.34
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 1.377792 - - Rp 131,716.92 -
- 2.29632 - - Rp 250,987.78 -
- 0.229632 - - Rp 27,555.84 -
- 0.076544 - - Rp 10,027.26 -
- - 45.9264 - - Rp 373,152.00
- - 38.272 - - Rp 108,836.00
Jumlah Rp 420,287.80 Rp 481,988.00
Total Rp 902,275.80
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 2.143332 - - Rp 204,902.54 -
- 3.57222 - - Rp 390,443.65 -
- 0.357222 - - Rp 42,866.64 -
- 0.119074 - - Rp 15,598.69 -
- - 71.4444 - - Rp 714,444.00
- - 59.537 - - Rp 208,379.50
Jumlah Rp 653,811.52 Rp 922,823.50
Total Rp 1,576,635.02
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 1.369602 - - Rp 130,933.95 -
- 2.28267 - - Rp 249,495.83 -
- 0.228267 - - Rp 27,392.04 -
- 0.076089 - - Rp 9,967.66 -
- - 30.4356 - - Rp 494,578.50
- - 25.363 - - Rp 144,252.06
Jumlah Rp 417,789.48 Rp 638,830.56
Total Rp 1,056,620.04
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 1.415178 - - Rp 135,291.02 -
- 2.35863 - - Rp 257,798.26 -
- 0.235863 - - Rp 28,303.56 -
- 0.078621 - - Rp 10,299.35 -
- - 31.4484 - - Rp 1,210,763.40
- - 26.207 - - Rp 353,139.33
Jumlah Rp 431,692.19 Rp 1,563,902.73
Total Rp 1,995,594.91
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 3.953205 - - Rp 377,926.40 -
- 6.588675 - - Rp 720,142.18 -
- 0.6588675 - - Rp 79,064.10 -
- 0.19522 - - Rp 25,573.82 -
- - 58.566 - - Rp 3,440,752.50
- - 48.805 - - Rp 1,003,552.81
Jumlah Rp 1,202,706.50 Rp 4,444,305.31
Total Rp 5,647,011.81
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 4.952988 - - Rp 473,505.65 -
- 8.25498 - - Rp 902,269.31 -
- 0.825498 - - Rp 99,059.76 -
- 0.244592 - - Rp 32,041.55 -
- - 73.3776 - - Rp 6,970,872.00
- - 61.148 - - Rp 2,033,171.00
Jumlah Rp 1,506,876.28 Rp 9,004,043.00
Total Rp 10,510,919.28
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 12.8 - - Rp 1,223,680.00 -
- 4.6 - - Rp 502,780.00 -
- 0.044 - - Rp 5,280.00 -
- 0.064 - - Rp 8,384.00 -
- - 492 - - Rp 344,400.00
- - 456 - - Rp 501,600.00
- - 0.736 - - Rp 165,232.00
- - 0.48 - - Rp 120,000.00
- - 0.132 - - Rp 33,000.00
- - 19.4 - - Rp 232,800.00
Jumlah Rp 1,740,124.00 Rp 1,397,032.00
Total Rp 3,137,156.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 2.16 - - Rp 206,496.00 -
- 0.72 - - Rp 78,696.00 -
- 0.072 - - Rp 8,640.00 -
- 0.011 - - Rp 1,441.00 -
- - 114 - - Rp 125,400.00
- - 0.184 - - Rp 41,308.00
- - 30.446 - - Rp 21,312.20
- - 9 - - Rp 855,000.00
- - 4.85 - - Rp 58,200.00
- - 0.12 - - Rp 30,000.00
- - 0.033 - Rp 8,250.00
- - 4.5 - - Rp 315,000.00
- - 1.2 - - Rp 90,000.00
- - 2.25 - - Rp 127,831.50
- - 1.05 - - Rp 262,500.00
- - 5.4 - - Rp 1,350,000.00
- - 1.13 - - Rp 56,500.00
- - 0.3 - - Rp 761,119.20
Jumlah Rp 295,273.00 Rp 4,102,420.90
Total Rp 4,397,693.90
rial (Rp)
Alat
14 = (8 x 11)
No Nama Bahan
1 Closet Duduk
- 2 Closet Jongkok
- 3 Wastafel
- 4 Bathtube
- 5 Bak Mandi Teraso
- 6 Bak cuci piring
- 7 Floor Drain
- 8 Jet Washer Closet
10,671,880.00 9 Tandon Air
rial (Rp) 10 Kran Air
Alat 11 Jet Shower
14 = (8 x 11) 12 Bak Kontrol
13 Septic Tank
-
-
-
-
-
-
-
-
458,605.00
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
-
-
14,970,200.00
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
6,197,076.00
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
1,462,550.00
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
336,623.00
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
1,468,705.00
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
430,964.00
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
2,348,550.00
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
956,205.00
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
721,210.20
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
1,146,922.34
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
902,275.80
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
1,576,635.02
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
1,056,620.04
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
1,995,594.91
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
5,647,011.81
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
10,510,919.28
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
-
-
-
-
3,137,156.00
rial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4,397,693.90
Jumlah (buah) No Jenis Pipa Panjang (m) Pipa Ai
4 1 Pipa 1" No
1 2 Pipa 1/2" 1
4 3 Pipa 3/4" 2
2 4 Pipa 1 1/4" 3
1 5 Pipa 2" 4
1 6 Pipa 3" 5
5 7 Pipa 4" 6
4 7
1 8
5 Total (m)
2
4
1

Pipa A
No
1
2
3
4
5
6
7
Total (m)

Pipa Air
No
1
2
Total (m)

Pipa Air
No
1
2
3
4
Total (m)

Pipa A
No
1
2
Total (m)

Pipa Ai
No
1
2
3
4
Total (m)

Pipa Air
No
1
2
3
Total (m)
VOLUME PEKERJAAN SANITASI

Pipa Air Bersih d 3/4" Lantai 1


Panjang Horizontal (m) Panjang Vertikal (m)
3.934 5.4
2.859 6.1
1.689 5
0.45 2.1
1.861 -
3.369 -
6.835 -
1.257 -
Total (m) 40.854

Pipa Air Bersih d 1" Lantai 1


Panjang Horizontal (m) Panjang Vertikal (m)
3.966 4
1.002 -
3.738 -
3.164 -
0.494 - Pipa Air Kotor d 2" La
5.135 - No
9.752 - 1
Total (m) 31.251 2
3
Pipa Air Bersih d 1 1/4 " Lantai 1 4
Panjang Horizontal (m) Panjang Vertikal (m) 5
10.786 6.63 6
7.306 0.641 Total (m)
Total (m) 25.363
Pipa Air Kotor d 3" La
Pipa Air Bersih d 1/2 " Lantai 1 No
Panjang Horizontal (m) Panjang Vertikal (m) 1
- 6.936 2
0.683 5.6 3
8.437 - 4
3.286 - 5
Total (m) 24.942 6
7
8
Pipa Air Bersih d 1" Lantai 2 9
Panjang Horizontal (m) Panjang Vertikal (m) 10
1.787 Total (m)
1.849
Total (m) 3.636 Pipa Air Kotor d4" La
No
Pipa Air Bersih d 3/4" Lantai 2 1
Panjang Horizontal (m) Panjang Vertikal (m) 2
2.402 0.8 3
2.169 6.6 4
3.128 5
1.584 2 6
Total (m) 18.683 7
8
Pipa Air Bersih d 1/2 " Lantai 2 9
Panjang Horizontal (m) Panjang Vertikal (m) 10
4.096 3.3 11
2.082 0.641 12
2.57 0.641 Total (m)
Total (m) 13.33
KERJAAN SANITASI

ISOMETRI PIPA 1"

ISOMETRI PIPA 3/4"

Pipa Air Kotor d 2" Lantai 1 Pipa Air Kotor d 2" Lantai 2
Panjang Horizontal (m) Panjang Vertikal (m) No Panjang Horizontal (m)
1.51 1 1.199
5.1 0.9 2 0.852
0.631 0.2 3 2.16
1.414 0.2 4 0.594
6.992 5 0.25
0.637 6 0.768
Total (m) 17.584 Total (m)

Pipa Air Kotor d 3" Lantai 1 Pipa Air Kotor d 3" Lantai 2
Panjang Horizontal (m) Panjang Vertikal (m) No Panjang Horizontal (m)
0.432 1 4.695
5.564 Total (m)
9.916
5.455
4.718 1.45
0.314
5.535
0.236
6.116 0.3
0.874 3.2
Total (m) 44.11

Pipa Air Kotor d4" Lantai 1 Pipa Air Kotor d4" Lantai 2
Panjang Horizontal (m) Panjang Vertikal (m) No Panjang Horizontal (m)
1.56 1 1.72
0.38 2 1.641
5.866 3 4.05
0.296 4 2.407
5.572 1.9 Total (m)
2.41 3.2
9.173
5.33
0.404
8.595 0.25
0.124
3.97 0.7
Total (m) 49.73
ISOMETRI PIPA 1/2" (Warna Biru)

ISOMETRI PIPA 1 1/4"

Kotor d 2" Lantai 2


Panjang Vertikal (m)
0.8
0.6
0.3
0.3

0.8
8.623

Kotor d 3" Lantai 2


Panjang Vertikal (m)

4.695
Kotor d4" Lantai 2
Panjang Vertikal (m)
0.8

0.8

11.418
NO
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
URUTAN PEKERJAAN VOL SAT
2 3 4
Pemasangan Closet Duduk 4 Buah
Pemasangan Closet Jongkok 1 Buah
Pemasangan Wastafel 4 Buah
Pemasangan Bathtube 2 Buah
Pemasangan Bak Mandi Teraso Volume 0,3 m3 1 Buah
Pemasangan Bak Cuci Piring Stainlessteel 1 Buah
Pemasangan Floor Drain 5 Buah
Pemasangan Jet Washer Closet 4 Buah
Pemasangan Tandon Air 1 Buah
Pemasangan Kran Air Diameter 1/2" atau 3/4" 5 Buah
Pemasangan Jet Shower 2 Buah
Pemasangan Pipa PVC Tipe AW Diameter 1" 34.887 m
Pemasangan Pipa PVC Tipe AW Diameter 1/2" 38.272 m
Pemasangan Pipa PVC Tipe AW Diameter 3/4" 59.537 m
Pemasangan Pipa PVC Tipe AW Diameter 1 1/4 " 25.363 m
Pemasangan Pipa PVC Tipe AW Diameter 2" 26.207 m
Pemasangan Pipa PVC Tipe AW Diameter 3" 48.805 m
Pemasangan Pipa PVC Tipe AW Diameter 4" 61.148 m
Pemasangan Bak Kontrol Pas. Bata 60 cm x 60 cm x 65 cm 4 Buah
Pemasangan Septictank 2x1.5x2 m 1 Buah
Total Anggaran Biaya
RENCANA ANGGA

HARGA SATUAN JUMLAH HARGA


UPAH BAHAN UPAH BAHAN
5 6 7 = (3x5) 8 = (3x6)
Rp 457,870.00 Rp 2,210,100.00 Rp 1,831,480.00 Rp 8,840,400.00
Rp 298,510.00 Rp 160,095.00 Rp 298,510.00 Rp 160,095.00
Rp 299,065.00 Rp 3,443,485.00 Rp 1,196,260.00 Rp 13,773,940.00
Rp 98,538.00 Rp 3,000,000.00 Rp 197,076.00 Rp 6,000,000.00
Rp 902,550.00 Rp 560,000.00 Rp 902,550.00 Rp 560,000.00
Rp 41,223.00 Rp 295,400.00 Rp 41,223.00 Rp 295,400.00
Rp 13,741.00 Rp 280,000.00 Rp 68,705.00 Rp 1,400,000.00
Rp 13,741.00 Rp 94,000.00 Rp 54,964.00 Rp 376,000.00
Rp 1,004,550.00 Rp 1,344,000.00 Rp 1,004,550.00 Rp 1,344,000.00
Rp 13,741.00 Rp 177,500.00 Rp 68,705.00 Rp 887,500.00
Rp 186,605.10 Rp 174,000.00 Rp 373,210.20 Rp 348,000.00
Rp 10,981.60 Rp 21,893.75 Rp 383,115.08 Rp 763,807.26
Rp 10,981.60 Rp 12,593.75 Rp 420,287.80 Rp 481,988.00
Rp 10,981.60 Rp 15,500.00 Rp 653,811.52 Rp 922,823.50
Rp 16,472.40 Rp 25,187.50 Rp 417,789.48 Rp 638,830.56
Rp 16,472.40 Rp 59,675.00 Rp 431,692.19 Rp 1,563,902.73
Rp 24,643.10 Rp 91,062.50 Rp 1,202,706.50 Rp 4,444,305.31
Rp 24,643.10 Rp 147,250.00 Rp 1,506,876.28 Rp 9,004,043.00
Rp 435,031.00 Rp 349,258.00 Rp 1,740,124.00 Rp 1,397,032.00
Rp 295,273.00 Rp 4,102,420.90 Rp 295,273.00 Rp 4,102,420.90
Rp 13,088,909.04 Rp 57,304,488.26
RENCANA ANGGARAN BIAYA PEKERJAAN SANITASI

TOTAL HARGA No Tenaga Kerja


(UPAH+BAHAN) 1 2
9 = (7+8) 1 Pekerja
Rp 10,671,880.00 2 Tukang Batu
Rp 458,605.00 3 Kepala Tukang Batu
Rp 14,970,200.00 4 Mandor
Rp 6,197,076.00 TOTAL
Rp 1,462,550.00
Rp 336,623.00 No Bahan
Rp 1,468,705.00 1 2
Rp 430,964.00 1 Closet Duduk Warna Toto
Rp 2,348,550.00 2 PerlengkapanCloset Duduk (6% dari bahan)
Rp 956,205.00 3 Closet Jongkok Putih INA
Rp 721,210.20 4 Semen Portland
Rp 1,146,922.34 5 Pasir Pasang
Rp 902,275.80 6 Wastafel Toto L 521V1A
Rp 1,576,635.02 7 Perlengkapan Watafel (12% dari bahan)
Rp 1,056,620.04 8 Bathtube
Rp 1,995,594.91 9 Perlengkapan Bath tube (20% dari bahan)
Rp 5,647,011.81 10 Bak Mandi Fiberglass
Rp 10,510,919.28 11 Perlengkapan Bak Mandi (12% dari bahan)
Rp 3,137,156.00 12 Bak Cuci Piring
Rp 4,397,693.90 13 Waterdrain
Rp 70,393,397.29 14 Floor Drain
15 Jet Washer Closet
16 Tandon Air 1000L
17 Perlengkapan Tandon Air (12% dari Bahan)
18 Kran Air
19 Seal Tape
20 Jet Shower
21 Perlengkapan Jet Shower
22 Pipa PVC 1" Rucika
23 Perlengkapan Pipa PVC 1"(35% dari bahan)
24 Pipa PVC 1/2" Rucika
25 Perlengkapan Pipa PVC 1/2" (35% dari bahan)
26 Pipa PVC 3/4 " Rucika
27 Perlengkapan Pipa PVC 3/4" (35% dari bahan)
28 Pipa PVC 1 1/4" Rucika
29 Perlengkapan Pipa PVC 1 1/4" (35% dari bahan)
30 Pipa PVC 2" Rucika
31 Perlengkapan Pipa PVC 2" (35% dari bahan)
32 Pipa PVC 3" Rucika
33 Perlengkapan Pipa PVC 3" (35% dari bahan)
34 Pipa PVC 4" Rucika
35 Perlengkapan Pipa PVC 4" (35% dari bahan)
36 Bata Merah
37 Pasir Beton
38 Kerikil
39 Baja Tulangan
40 Pipa PVC 4"
41 Batu Split Pecah Mesin 1/2
42 Galian Tanah
43 Pipa GIP 1.5
44 Galian Tanah untuk Rembesan
45 Pas. Ijuk
46 Urugan Kembali/Perataan Tanah
47 Plat Penutup Beton
TOTAL
Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah
3 4 5 6 = (4 x 5)
Oh 56.99 Rp 95,600.00 Rp 5,448,055.57
Oh 59.87 Rp 109,300.00 Rp 6,543,431.95
Oh 4.92 Rp 120,000.00 Rp 590,960.58
Oh 3.87 Rp 131,000.00 Rp 506,460.93
TOTAL Rp 13,088,909.04

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Bahan


3 4 5 6 = (4 x 5)
Buah 4.000 Rp 2,085,000.00 Rp 8,340,000.00
Set 4.000 Rp 125,100.00 Rp 500,400.00
Buah 1.000 Rp 151,250.00 Rp 151,250.00
m3 600.000 Rp 1,100.00 Rp 660,000.00
m3 0.970 Rp 224,500.00 Rp 217,765.00
Buah 4.800 Rp 2,602,000.00 Rp 12,489,600.00
Set 4.000 Rp 312,240.00 Rp 1,248,960.00
Buah 2.000 Rp 2,500,000.00 Rp 5,000,000.00
Set 2.000 Rp 500,000.00 Rp 1,000,000.00
Buah 1.000 Rp 500,000.00 Rp 500,000.00
Set 1.000 Rp 60,000.00 Rp 60,000.00
Buah 1.000 Rp 195,400.00 Rp 195,400.00
Buah 1.000 Rp 100,000.00 Rp 100,000.00
Buah 5.000 Rp 280,000.00 Rp 1,400,000.00
Buah 4.000 Rp 94,000.00 Rp 376,000.00
Buah 1.000 Rp 1,200,000.00 Rp 1,200,000.00
Set 1.000 Rp 144,000.00 Rp 144,000.00
Buah 5.000 Rp 176,000.00 Rp 880,000.00
Buah 0.125 Rp 60,000.00 Rp 7,500.00
Buah 2.000 Rp 94,000.00 Rp 188,000.00
Set 2.000 Rp 80,000.00 Rp 160,000.00
m 41.864 Rp 14,125.00 Rp 591,334.65
set 34.887 Rp 4,943.75 Rp 172,472.61
m 45.926 Rp 8,125.00 Rp 373,152.00
set 38.272 Rp 2,843.75 Rp 108,836.00
m 71.444 Rp 10,000.00 Rp 714,444.00
Set 59.537 Rp 3,500.00 Rp 208,379.50
m 30.436 Rp 16,250.00 Rp 494,578.50
set 25.363 Rp 5,687.50 Rp 144,252.06
m 31.448 Rp 38,500.00 Rp 1,210,763.40
set 26.207 Rp 13,475.00 Rp 353,139.33
m 58.566 Rp 58,750.00 Rp 3,440,752.50
set 48.805 Rp 20,562.50 Rp 1,003,552.81
m 73.378 Rp 95,000.00 Rp 6,970,872.00
set 61.148 Rp 33,250.00 Rp 2,033,171.00
Buah 522.446 Rp 700.00 Rp 365,712.20
m3 0.600 Rp 250,000.00 Rp 150,000.00
m3 1.182 Rp 250,000.00 Rp 295,500.00
Kg 24.250 Rp 12,000.00 Rp 291,000.00
m 9.000 Rp 95,000.00 Rp 855,000.00
m3 0.033 Rp 250,000.00 Rp 8,250.00
m3 4.500 Rp 70,000.00 Rp 315,000.00
m3 1.200 Rp 75,000.00 Rp 90,000.00
m3 2.250 Rp 56,814.00 Rp 127,831.50
m2 5.400 Rp 250,000.00 Rp 1,350,000.00
m3 1.130 Rp 50,000.00 Rp 56,500.00
m3 0.300 Rp 2,537,064.00 Rp 761,119.20
TOTAL Rp 57,304,488.26
ANALISA HARGA SATUAN P

NO URAIAN KOEF SAT


1 2 3 4
L PEKERJAA
L.1 Pemasangan 1 m3 Railing Tangga Kayu
Pekerja 0.25 Oh
Tukang Kayu 0.25 Oh
Kepala Tukang Kayu 0.025 Oh
Mandor 0.013 Oh
Besi Strip Tebal 3 mm 1.1 Kg
Baut M12 4 Kg
Kayu Balok Rasmala 0.012 m3
JUMLAH
L.2 Pemasangan 1 m2 Grace Wood Untuk Bordes Tangga
Pekerja 0.7 Oh
Tukang Kayu 0.35 Oh
Kepala Tukang Kayu 0.035 Oh
Mandor 0.035 Oh
Grace Wood (Costul Dev Uk. 12 x 102 x 900 mm) 1.05 m2
Lem Kayu 0.6 Kg
JUMLAH
L.3 Pemasangan 1 m2 Lantai Kayu Untuk Anak Tangga
Pekerja 0.12 Oh
Tukang Kayu 0.12 Oh
Kepala Tukang Kayu 0.012 Oh
Mandor 0.006 Oh
Kayu Papan Borneo Super 0.003 m3
Paku 5 cm - 7 cm 0.05 Kg
JUMLAH
L.4 Pemasangan 1 m2 Balkon
Pekerja 0.25 Oh
Tukang Besi 0.25 Oh
Kepala Tukang Besi 0.025 Oh
Mandor 0.013 Oh
Rangka Besi Hollow 3.5 m'
Pengelasan 0.2708 m3
JUMLAH
L.5 Pemasangan 1m' Pipa Besi Diameter 2-3"
Pekerja 0.054 Oh
Tukang Besi 0.09 Oh
Kepala Tukang Besi 0.009 Oh
Mandor 0.027 Oh
Pipa Besi Diameter 2-3" 1.2 m'
Perlengkapan 0.35 %
JUMLAH
L.6 Pemasangan 1 m2 Batu Tempel Hitam
Pekerja 0.7 Oh
Tukang Batu 0.35 Oh
Kepala Tukang Batu 0.035 Oh
Mandor 0.035 Oh
Batu Tempel Hitam 1.1 bh
Semen Portland 11.75 Kg
Pasir Pasang 0.035 m3
JUMLAH
L.7 Pemasangan 1 m2 Bekisting untuk Dapur Bersih
Pekerja 0.520 Oh
Tukang Kayu 0.260 Oh
Kepala Tukang Kayu 0.026 Oh
Mandor 0.026 Oh
Kayu Meranti Papan 0.040 m3
Paku 8-12 cm 0.300 Kg
Minyak Bekisting 0.100 Liter
JUMLAH
L.8 Pengecoran 1 m3 Dapur Bersih
Pekerja 1.65 Oh
Tukang Batu 0.275 Oh
Kepala Tukang Batu 0.028 Oh
Mandor 0.083 Oh
Semen Portland 384 Kg
Pasir Beton 0.4943 m3
Koral Beton 0.7696 m3
JUMLAH
L.9 Pemasangan 1 m2 Plesteran 1 SP : 4 PP Tebal 15 mm untuk Dapur Bersih
Pekerja 0.3 Oh
Tukang Batu 0.15 Oh
Kepala Tukang Batu 0.015 Oh
Mandor 0.015 Oh
Semen Portland 6.24 Kg
Pasir Pasang 0.024 m3
JUMLAH
L.10 Pemasangan 1 m2 Acian Dapur Bersih
Pekerja 0.2 Oh
Tukang Batu 0.1 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.01 Oh
Semen Portland 3.25 Kg
JUMLAH
L.11 Pemasangan 1 m2 Keramik Dapur Bersih 20 x 25 Roman Polos Golongan C
Pekerja 0.9 Oh
Tukang Batu 0.45 Oh
Kepala Tukang Batu 0.045 Oh
Mandor 0.045 Oh
Keramik Dinding 20x25 Roman Polos 20 Buah
Semen Portland 9.3 Kg
Pasir Pasang 0.018 m3
Semen Warna 1.94 Kg
JUMLAH
ISA HARGA SATUAN PEKERJAAN LAIN-LAIN

Harga Satuan (Rp) Jumlah Harga (Rp)


Upah Bahan Alat Upah Bahan Alat
5 6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)
PEKERJAAN LAIN-LAIN

Rp 95,600.00 - - Rp 23,900.00 - -
Rp 109,300.00 - - Rp 27,325.00 - -
Rp 120,000.00 - - Rp 3,000.00 - -
Rp 131,000.00 - - Rp 1,703.00 - -
- Rp 25,000.00 - - Rp 27,500.00 -
- Rp 3,000.00 - - Rp 12,000.00 -
- Rp 4,000,000.00 - - Rp 48,000.00 -
Rp 55,928.00 Rp 87,500.00 -

Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 325,000.00 - - Rp 341,250.00 -
- Rp 15,000.00 - - Rp 9,000.00 -
Rp 113,960.00 Rp 350,250.00 -

Rp 95,600.00 - - Rp 11,472.00 - -
Rp 109,300.00 - - Rp 13,116.00 - -
Rp 120,000.00 - - Rp 1,440.00 - -
Rp 131,000.00 - - Rp 786.00 - -
- Rp 5,500,000.00 - - Rp 16,500.00 -
- Rp 16,000.00 - - Rp 800.00 -
Rp 26,814.00 Rp 17,300.00 -

Rp 95,600.00 - - Rp 23,900.00 - -
Rp 109,300.00 - - Rp 27,325.00 - -
Rp 120,000.00 - - Rp 3,000.00 - -
Rp 131,000.00 - - Rp 1,703.00 - -
- Rp 25,000.00 - - Rp 87,500.00 -
- Rp 230,000.00 - - Rp 62,284.00 -
Rp 55,928.00 Rp 149,784.00 -

Rp 95,600.00 - - Rp 5,162.40 - -
Rp 109,300.00 - - Rp 9,837.00 - -
Rp 120,000.00 - - Rp 1,080.00 - -
Rp 131,000.00 - - Rp 3,537.00 - -
- Rp 65,500.00 - - Rp 78,600.00 -
- Rp 18,000.00 - - Rp 6,300.00 -
Rp 19,616.40 Rp 84,900.00 -

Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 9,000.00 - - Rp 9,900.00 -
- Rp 1,100.00 - - Rp 12,925.00 -
- Rp 224,500.00 - - Rp 7,857.50 -
Rp 113,960.00 Rp 30,682.50 -

Rp 95,600.00 - - Rp 49,712.000 - -
Rp 109,300.00 - - Rp 28,418.000 - -
Rp 120,000.00 - - Rp 3,120.000 - -
Rp 131,000.00 - - Rp 3,406.000 - -
- Rp 3,000,000.00 - - Rp 120,000.000 -
- Rp 15,000.00 - - Rp 4,500.000 -
- Rp 16,500.00 - - Rp 1,650.000 -
Rp 84,656.00 Rp 126,150.00 -

Rp 95,600.00 - - Rp 157,740.00 - -
Rp 109,300.00 - - Rp 30,057.50 - -
Rp 120,000.00 - - Rp 3,360.00 - -
Rp 131,000.00 - - Rp 10,873.00 - -
- Rp 1,100.00 - - Rp 422,400.00 -
- Rp 250,000.00 - - Rp 123,575.00 -
- Rp 224,500.00 - - Rp 172,775.20 -
Rp 202,030.50 Rp 718,750.20 -
pur Bersih
Rp 95,600.00 - - Rp 28,680.00 - -
Rp 109,300.00 - - Rp 16,395.00 - -
Rp 120,000.00 - - Rp 1,800.00 - -
Rp 131,000.00 - - Rp 1,965.00 - -
- Rp 1,100.00 - - Rp 6,864.00 -
- Rp 224,500.00 - - Rp 5,388.00 -
Rp 48,840.00 Rp 12,252.00 -

Rp 95,600.00 - - Rp 19,120.00 - -
Rp 109,300.00 - - Rp 10,930.00 - -
Rp 120,000.00 - - Rp 1,200.00 - -
Rp 131,000.00 - - Rp 1,310.00 - -
- Rp 1,100.00 - - Rp 3,575.00 -
Rp 32,560.00 Rp 3,575.00 -
Golongan C
Rp 95,600.00 - - Rp 86,040.00 - -
Rp 109,300.00 - - Rp 49,185.00 - -
Rp 120,000.00 - - Rp 5,400.00 - -
Rp 131,000.00 - - Rp 5,895.00 - -
- Rp 4,675.00 - - Rp 93,500.00 -
- Rp 1,100.00 - - Rp 10,230.00 -
- Rp 224,500.00 - - Rp 4,041.00 -
- Rp 15,000.00 - - Rp 29,100.00 -
Rp 146,520.00 Rp 136,871.00 -
REKA

Jumlah (Rp) No Uraian Pekerjaan


11 = ( 8+9+10) 1 2
L
L.1 Pemasangan 1 m3 Railing Tangga Kayu
Rp 23,900.00 Pekerja
Rp 27,325.00 Tukang Kayu
Rp 3,000.00 Kepala Tukang Kayu
Rp 1,703.00 Mandor
Rp 27,500.00 Besi Strip Tebal 5 mm
Rp 12,000.00 Baut M12
Rp 48,000.00 Kayu Balok Rasmala
Rp 143,428.00

Rp 66,920.00 L.2 Pemasangan 1 m2 Grace Wood Untuk Bordes Tangga


Rp 38,255.00 Pekerja
Rp 4,200.00 Tukang Kayu
Rp 4,585.00 Kepala Tukang Kayu
Rp 341,250.00 Mandor
Rp 9,000.00 Grace Wood (Costul Dev Uk. 12 x 102 x 900 mm)
Rp 464,210.00 Lem Kayu

Rp 11,472.00
Rp 13,116.00
No Uraian Pekerjaan
Rp 1,440.00
Rp 786.00 1 2
Rp 16,500.00 L.3 Pemasangan 1 m2 Lantai Kayu Untuk Anak Tangga
Rp 800.00 Pekerja
Rp 44,114.00 Tukang Kayu
Kepala Tukang Kayu
Rp 23,900.00 Mandor
Rp 27,325.00 Kayu Papan Borneo Super
Rp 3,000.00 Paku 5 cm - 7 cm
Rp 1,703.00
Rp 87,500.00
Rp 62,284.00
No Uraian Pekerjaan
Rp 205,712.00
1 2
Rp 5,162.40 L.4 Pemasangan 1m2 Balkon
Rp 9,837.00 Pekerja
Rp 1,080.00 Tukang Besi
Rp 3,537.00 Kepala Tukang Besi
Rp 78,600.00 Mandor
Rp 6,300.00 Rangka Besi Hollow
Rp 104,516.40 Pengelasan

Rp 66,920.00
Rp 38,255.00
No Uraian Pekerjaan
Rp 4,200.00
Rp 4,585.00 1 2
Rp 9,900.00 L.5 Pemasangan 1m' Pipa Besi Diameter 2-3"
Rp 12,925.00 Pekerja
Rp 7,857.50 Tukang Besi
Rp 144,642.50 Kepala Tukang Besi
Mandor
Rp 49,712.000 Pipa Besi Diameter 2-3"
Rp 28,418.000 Perlengkapan
Rp 3,120.000
Rp 3,406.000
Rp 120,000.000
No Uraian Pekerjaan
Rp 4,500.000
Rp 1,650.000 1 2
Rp 210,806.00 L.6 Pemasangan 1 m2 Batu Tempel Hitam
Pekerja
Rp 157,740.00 Tukang Batu
Rp 30,057.50 Kepala Tukang Batu
Rp 3,360.00 Mandor
Rp 10,873.00 Batu Tempel Hitam
Rp 422,400.00 Semen Portland
Rp 123,575.00 Pasir Pasang
Rp 172,775.20
Rp 920,780.70
No Uraian Pekerjaan
Rp 28,680.00
Rp 16,395.00 1 2
Rp 1,800.00 L.7 Pemasangan 1 m2 Bekisting untuk Dapur Bersih
Rp 1,965.00 Pekerja
Rp 6,864.00 Tukang Kayu
Rp 5,388.00 Kepala Tukang Kayu
Rp 61,092.00 Mandor
Kayu Meranti Papan
Rp 19,120.00 Paku 8-12 cm
Rp 10,930.00 Minyak Bekisting
Rp 1,200.00
Rp 1,310.00
Rp 3,575.00
No Uraian Pekerjaan
Rp 36,135.00
1 2
Rp 86,040.00 L.8 Pengecoran 1 m3 Dapur Bersih
Rp 49,185.00 Pekerja
Rp 5,400.00 Tukang Batu
Rp 5,895.00 Kepala Tukang Batu
Rp 93,500.00 Mandor
Rp 10,230.00 Semen Portland
Rp 4,041.00 Pasir Beton
Rp 29,100.00 Koral Beton
Rp 148,166.00

No Uraian Pekerjaan
1 2
L.9 Pemasangan 1 m2 Plesteran 1 SP : 4 PP Tebal 15 mm untuk Dapur Bersih
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Pasang

No Uraian Pekerjaan
1 2
L.10 Pemasangan 1 m2 Acian Dapur Bersih
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland

No Uraian Pekerjaan
1 2
L.11 Pemasangan 1 m2 Keramik Dapur Bersih 20 x 25 Roman Polos Golongan C
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Keramik Dinding 20x25 Roman Polos
Semen Portland
Pasir Pasang
Semen Warna
REKAPITULASI KEBUTUHAN TENAGA KERJA DAN BAHAN PEKERJAAN

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
PEKERJAAN LAIN-LAIN
1.7172 - m3
0.25 Oh Rp 95,600.00 -
0.25 Oh Rp 109,300.00 -
0.025 Oh Rp 120,000.00 -
0.013 Oh Rp 131,000.00 -
1.1 Kg - Rp 25,000.00
4 Kg - Rp 3,000.00
0.012 m3 - Rp 4,000,000.00

ordes Tangga 3.3 - m3


0.7 Oh Rp 95,600.00 -
0.35 Oh Rp 109,300.00 -
0.035 Oh Rp 120,000.00 -
0.035 Oh Rp 131,000.00 -
x 900 mm) 1.05 m2 - Rp 325,000.00
0.6 Kg - Rp 15,000.00

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
nak Tangga 3.6 - m2
0.12 Oh Rp 95,600.00 -
0.12 Oh Rp 109,300.00 -
0.012 Oh Rp 120,000.00 -
0.006 Oh Rp 131,000.00 -
0.003 m3 - Rp 5,500,000.00
0.05 Kg - Rp 16,000.00

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
14.3 - m2
0.25 Oh Rp 95,600.00
0.25 Oh Rp 109,300.00
0.025 Oh Rp 120,000.00
0.013 Oh Rp 131,000.00
3.5 m' Rp 25,000.00
0.2708 m3 Rp 230,000.00

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
3" 7.4 - m'
0.054 Oh Rp 95,600.00 -
0.09 Oh Rp 109,300.00 -
0.009 Oh Rp 120,000.00 -
0.027 Oh Rp 131,000.00 -
1.2 m' - Rp 65,500.00
0.35 % - Rp 18,000.00

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
12.932 - m2
0.7 Oh Rp 95,600.00 -
0.35 Oh Rp 109,300.00 -
0.035 Oh Rp 120,000.00 -
0.035 Oh Rp 131,000.00 -
1.1 bh - Rp 9,000.00
11.75 Kg - Rp 1,100.00
0.035 m3 - Rp 224,500.00

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
ur Bersih 2.913 - m2
0.520 Oh Rp 95,600.00 -
0.260 Oh Rp 109,300.00 -
0.026 Oh Rp 120,000.00 -
0.026 Oh Rp 131,000.00 -
0.040 m3 - Rp 3,000,000.00
0.300 Kg - Rp 15,000.00
0.100 Liter - Rp 16,500.00
Harga Satuan (Rp)
Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
1.565 - m3
1.65 Oh Rp 95,600.00
0.275 Oh Rp 109,300.00
0.028 Oh Rp 120,000.00
0.083 Oh Rp 131,000.00
384 Kg Rp 1,100.00
0.4943 m3 Rp 250,000.00
0.7696 m3 Rp 224,500.00

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
Tebal 15 mm untuk Dapur Bersih 2.913 - m2
0.3 Oh Rp 95,600.00 -
0.15 Oh Rp 109,300.00 -
0.015 Oh Rp 120,000.00 -
0.015 Oh Rp 131,000.00 -
6.24 Kg - Rp 1,100.00
0.024 m3 - Rp 224,500.00

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
2.913 - m2
0.2 Oh Rp 95,600.00 -
0.1 Oh Rp 109,300.00 -
0.01 Oh Rp 120,000.00 -
0.01 Oh Rp 131,000.00 -
3.25 Kg - Rp 1,100.00

Harga Satuan (Rp)


Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
h 20 x 25 Roman Polos Golongan C 5.3405 - m2
0.9 Oh Rp 95,600.00 -
0.45 Oh Rp 109,300.00 -
0.045 Oh Rp 120,000.00 -
0.045 Oh Rp 131,000.00 -
20 Buah - Rp 4,675.00
9.3 Kg - Rp 1,100.00
0.018 m3 - Rp 224,500.00
1.94 Kg - Rp 15,000.00
BAHAN PEKERJAAN LAIN-LAIN

(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)


Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
AIN

- 0.4293 - - Rp 41,041.08 -
- 0.4293 - - Rp 46,922.49 -
- 0.04293 - - Rp 5,151.60 -
- 0.0223236 - - Rp 2,924.39 -
- - 1.88892 - - Rp 47,223.00
- - 6.8688 - - Rp 20,606.40
- - 0.0206064 - - Rp 82,425.60
Jumlah Rp 96,039.56 Rp 150,255.00
Total Rp 246,294.56

- 2.31 - - Rp 220,836.00 -
- 1.155 - - Rp 126,241.50 -
- 0.1155 - - Rp 13,860.00 -
- 0.1155 - - Rp 15,130.50 -
- - 3.465 - - Rp 1,126,125.00
- - 1.98 - - Rp 29,700.00
Jumlah Rp 376,068.00 Rp 1,155,825.00
Total Rp 1,531,893.00
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 0.432 - - Rp 41,299.20 -
- 0.432 - - Rp 47,217.60 -
- 0.0432 - - Rp 5,184.00 -
- 0.0216 - - Rp 2,829.60 -
- - 0.0108 - - Rp 59,400.00
- - 0.18 - - Rp 2,880.00
Jumlah Rp 96,530.40 Rp 62,280.00
Total Rp 158,810.40
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 3.564575 - Rp 340,773.37 -
- 3.564575 - Rp 389,608.05 -
- 0.3564575 - Rp 42,774.90 -
- 0.1853579 - Rp 24,281.88 -
- 49.90405 - - Rp 1,247,601.25
- 3.86114764 - - Rp 888,063.96
Jumlah Rp 797,438.20 Rp 2,135,665.21
Total Rp 2,933,103.41
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 0.40122 - - Rp 38,356.63 -
- 0.6687 - - Rp 73,088.91 -
- 0.06687 - - Rp 8,024.40 -
- 0.20061 - - Rp 26,279.91 -
- - 8.916 - - Rp 583,998.00
- - 2.6005 - - Rp 46,809.00
Jumlah Rp 145,749.85 Rp 630,807.00
Total Rp 776,556.85
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 9.0524 - - Rp 865,409.44 -
- 4.5262 - - Rp 494,713.66 -
- 0.45262 - - Rp 54,314.40 -
- 0.45262 - - Rp 59,293.22 -
- - 14.2252 - - Rp 128,026.80
- - 151.951 - - Rp 167,146.10
- - 0.45262 - - Rp 101,613.19
Jumlah Rp 1,473,730.72 Rp 396,786.09
Total Rp 1,870,516.81
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 1.51476 - - Rp 144,811.06 -
- 0.75738 - - Rp 82,781.63 -
- 0.075738 - - Rp 9,088.56 -
- 0.075738 - - Rp 9,921.68 -
- - 0.11652 - - Rp 349,560.00
- - 0.8739 - - Rp 13,108.50
- - 0.2913 - - Rp 4,806.45
Jumlah Rp 246,602.93 Rp 367,474.95
Total Rp 614,077.88
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

2.581524 Rp 246,793.69 -
0.430254 Rp 47,026.76 -
0.04380768 Rp 5,256.92 -
0.12985848 Rp 17,011.46 -
600.79104 - Rp 660,870.14
0.773362008 - Rp 193,340.50
1.204085376 - Rp 270,317.17
Jumlah Rp 316,088.84 Rp 1,124,527.81
Total Rp 1,440,616.65
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 0.8739 - - Rp 83,544.84 -
- 0.43695 - - Rp 47,758.64 -
- 0.043695 - - Rp 5,243.40 -
- 0.043695 - - Rp 5,724.05 -
- - 18.17712 - - Rp 19,994.83
- - 0.069912 - - Rp 15,695.24
Jumlah Rp 142,270.92 Rp 35,690.08
Total Rp 177,961.00
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 0.5826 - - Rp 55,696.56 -
- 0.2913 - - Rp 31,839.09 -
- 0.02913 - - Rp 3,495.60 -
- 0.02913 - - Rp 3,816.03 -
- - 9.46725 - - Rp 10,413.98
Jumlah Rp 94,847.28 Rp 10,413.98
Total Rp 105,261.26
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)

- 4.80645 - - Rp 459,496.62 -
- 2.403225 - - Rp 262,672.49 -
- 0.2403225 - - Rp 28,838.70 -
- 0.2403225 - - Rp 31,482.25 -
- - 106.81 - - Rp 499,336.75
- - 49.66665 - - Rp 54,633.32
- - 0.096129 - - Rp 21,580.96
- - 10.36057 - - Rp 155,408.55
Jumlah Rp 782,490.06 Rp 730,959.58
Total Rp 1,513,449.64
RAILING TANGGA
erial (Rp)
Alat Dimensi (m)
Tipe Gambar
14 = (8 x 11) a b

-
A 0.08 0.08
-
-
-
- Lebar (m)
B Gambar Terlampir
- 0.12
-
-
246,294.56
C 0.076
-
-
-
-
-
-
-
1,531,893.00 D 0.12
erial (Rp)
Alat
14 = (8 x 11)

-
-
-
- E 0.076
-
-
-
158,810.40
VOLUME RAILING TOTAL (M3
erial (Rp)
Alat
14 = (8 x 11) DIMENSI
Panjang (m)
-
-
-
-
- 2.2
-
-
2,933,103.41
erial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
776,556.85
erial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
-
1,870,516.81
erial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
-
614,077.88
erial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
-
1,440,616.65
erial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
177,961.00
erial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
105,261.26
erial (Rp)
Alat
14 = (8 x 11)

-
-
-
-
-
-
-
-
-
1,513,449.64
VOL

Dimensi (m)
Panjang (m) Luas (m2) Volume (m3)
c d e f

0.12 0.08 0.02 0.028 3 0.0224 0.0672

Lebar (m) Tinggi (m)


3 0.0912 0.8208
0.12 0.76

0.076 0.3 0.05 0.0038 0.0114

0.12 1.12 0.6 0.072 0.8064

0.076 0.3 0.05 0.0038 0.0114

ME RAILING TOTAL (M3) 1.7172

DIMENSI
Lebar (m) Luas (m2)
1.5 3.3
VOLUME PEKERJAAN LAIN-LAIN

VOLUME LANTAI KAYU (m2)


Panjang (m) = 0.4 m
Lebar (m) = 0.27 m
Antrade
Jumlah = 20 Buah
Luas (m2) = 2.16 m2
Panjang (m) = 0.4 m
Lebar (m) = 0.18 m
Optrade
Jumlah = 20 Buah
Luas (m2) = 1.44 m2
Volume Total = 3.6 m2

Volume Pemasangan Pipa 2-3" (m')


Panjang 1 = 0.670 m'
Panjang 2 = 4.160 m'
Panjang 3 = 2.600 m'
Total Panjang = 7.430 m'

No Plesteran Volume (m2)


1 Pas 1 PC : 4 PS 3.13
Total (m2) 3.13

Pemasangan Plesteran (m2)


Panjang 1 = 1.375 m
Panjang 2 = 0.615 m
Panjang 3 = 2.865 m
Tinggi = 0.6 m
Luas Sisi Plesteran = 2.913 m2

VOLUME ACIAN 

No Plesteran Volume Acian (m2)


1 Pas Plester 1 PC : 4 PS 2.913
Total (m2) 2.913
Volume Balkon (m2) Pengecoran Dapur
Panjang 1 = 0.670 m
Panjang 2 = 4.160 m
1
Panjang 3 = 2.600 m
Tinggi = 0.810 m
Luas 1 = 0.543 m2
Luas 2 = 3.370 m2
2
Luas 3 = 2.106 m2
Total = 14.258 m2
Total Volume

Volume Dinding Batu Alam (m2) Pemasangan bekisting (m


Panjang (m) = 2.2 m Panjang 1
Tinggi (m) = 7 m Panjang 2
L. Kusen J2 = 2.268 m2 Panjang 3
L. Kusen GB = 0.2 m2 Tinggi
Luas Bersih Dinding = 12.932 m2 Luas Sisi Bekisting

Vol Plesteran (m2) = 2 x Vol. Cor Dapur


2 x 1.565
3.13

Pemasangan Keramik Dapur (m2)


Panjang 1 = 1.375 m
Panjang 2 = 0.615 m
Panjang 3 = 2.865 m
Tinggi = 0.6 m
Luas Sisi = 2.913 m2

Pemasangan Dinding Keramik Dapur (m2)


Panjang 1 = 1.375 m
Panjang 2 = 0.615 m
Panjang 3 = 2.865 m
Tinggi = 0.5 m
Luas Sisi = 2.4275 m2
NO
Pengecoran Dapur (m3)
Panjang = 1.375 m 1
Lebar = 0.615 m L.1
Tinggi = 0.600 m L.2
Volume = 0.507 m3 L.3
Panjang = 2.865 m L.4
Lebar = 0.615 m L.5
Tinggi = 0.600 m L.6
Volume = 1.057 m3 L.7
tal Volume = 1.565 m3 L.8
L.9
Pemasangan bekisting (m2) L.10
= 1.375 m L.11
= 0.615 m
= 2.865 m
= 0.6 m No
= 2.913 m2 1
1
2
3
4
5
6
7
8

No
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
RENCANA AN

URUTAN PEKERJAAN VOL SAT


2 3 4
Pemasangan 1 m3 Railing Tangga Kayu 1.7172 m3
Pemasangan 1 m2 Grace Wood Untuk Bordes Tangga 3.3000 m2
Pemasangan 1 m2 Lantai Kayu Untuk Anak Tangga 3.6000 m2
Pemasangan 1 m2 Balkon 14.2583 m2
Pemasangan 1m' Pipa Besi Diameter 2-3" 7.4300 m'
Pemasangan 1 m2 Batu Tempel Hitam 12.9320 m2
Pemasangan 1 m2 Bekisting untuk Dapur Bersih 2.9130 m2
Pengecoran 1 m3 Dapur Bersih 1.5646 m3
Pemasangan 1 m2 Plesteran 1 SP : 4 PP Tebal 15 mm untuk Dapur Bersih 2.9130 m2
Pemasangan 1 m2 Acian Dapur Bersih 2.9130 m2
Pemasangan 1 m2 Keramik Dapur Bersih 20 x 25 Roman Polos Golongan C 5.3405 m2
Total Anggaran Biaya

Tenaga Kerja Satuan


2 3
Pekerja Oh
Tukang Kayu Oh
Tukang Besi Oh
Tukang Batu Oh
Kepala Tukang Kayu Oh
Kepala Tukang Besi Oh
Kepala Tukang Batu Oh
Mandor Oh
TOTAL

Bahan Satuan
2 3
Besi Strip Tebal 3mm Kg
Baut M12 Kg
Kayu Balok Rasmala m3
Grace Wood (Costul Dev Uk. 12x102x900 mm) m2
Lem Kayu Kg
Kayu Papan Borneo Super m3
Paku 5 cm - 7 cm Kg
Rangka Besi Hollow m'
Pengelasan m3
Pipa Besi Diameter 2-3" m'
Perlengkapan %
Batu Tempel Hitam buah
Semen Portland Kg
Pasir Pasang m3
Kayu Meranti Papan m3
Paku 8-12 cm Kg
Minyak Bekisting Liter
Pasir Beton m3
Koral Beton m3
Keramik Dinding 20x25 Roman Polos buah
Semen Warna Kg
TOTAL
RENCANA ANGGARAN BIAYA PEKERJAAN LAIN-LAIN

HARGA SATUAN JUMLAH HARGA


UPAH BAHAN UPAH BAHAN
5 6 7 = (3x5) 8 = (3x6)
Rp 55,928.00 Rp 87,500.00 Rp 96,039.56 Rp 150,255.0000
Rp 113,960.00 Rp 350,250.00 Rp 376,068.00 Rp 1,155,825.0000
Rp 26,814.00 Rp 17,300.00 Rp 96,530.40 Rp 62,280.0000
Rp 55,928.00 Rp 149,784.00 Rp 797,438.20 Rp 2,135,665.2072
Rp 19,616.40 Rp 84,900.00 Rp 145,749.85 Rp 630,807.0000
Rp 113,960.00 Rp 30,682.50 Rp 1,473,730.72 Rp 396,786.0900
Rp 84,656.00 Rp 126,150.00 Rp 246,602.93 Rp 367,474.9500
Rp 202,030.50 Rp 718,750.20 Rp 316,088.84 Rp 1,124,527.8129
Rp 48,840.00 Rp 12,252.00 Rp 142,270.92 Rp 35,690.0760
Rp 32,560.00 Rp 3,575.00 Rp 94,847.28 Rp 10,413.9750
Rp 146,520.00 Rp 136,871.00 Rp 782,490.06 Rp 730,959.5755
Rp 4,567,856.76 Rp 6,800,684.69

Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah


4 5 6 = (4 x 5)
26.55 Rp 95,600.00 Rp 2,538,058.49
2.77 Rp 109,300.00 Rp 303,163.22
4.23 Rp 109,300.00 Rp 462,696.96
8.09 Rp 109,300.00 Rp 884,010.64
0.28 Rp 120,000.00 Rp 33,284.16
0.42 Rp 120,000.00 Rp 50,799.30
0.81 Rp 120,000.00 Rp 97,149.02
1.52 Rp 131,000.00 Rp 198,694.97
Rp 4,567,856.76

Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah


4 5 6 = (4 x 5)
1.889 Rp 25,000.00 Rp 47,223.00
6.869 Rp 3,000.00 Rp 20,606.40
0.021 Rp 4,000,000.00 Rp 82,425.60
3.465 Rp 325,000.00 Rp 1,126,125.00
1.980 Rp 15,000.00 Rp 29,700.00
0.011 Rp 5,500,000.00 Rp 59,400.00
0.180 Rp 16,000.00 Rp 2,880.00
49.904 Rp 25,000.00 Rp 1,247,601.25
3.861 Rp 230,000.00 Rp 888,063.96
8.916 Rp 65,500.00 Rp 583,998.00
2.601 Rp 18,000.00 Rp 46,809.00
14.225 Rp 9,000.00 Rp 128,026.80
830.053 Rp 1,100.00 Rp 913,058.37
0.619 Rp 224,500.00 Rp 138,889.39
0.117 Rp 3,000,000.00 Rp 349,560.00
0.874 Rp 15,000.00 Rp 13,108.50
0.291 Rp 16,500.00 Rp 4,806.45
0.773 Rp 250,000.00 Rp 193,340.50
1.204 Rp 224,500.00 Rp 270,317.17
106.810 Rp 4,675.00 Rp 499,336.75
10.361 Rp 15,000.00 Rp 155,408.55
Rp 6,800,684.69
TOTAL HARGA
(UPAH+BAHAN)
9 = (7+8)
Rp 246,294.56
Rp 1,531,893.00
Rp 158,810.40
Rp 2,933,103.41
Rp 776,556.85
Rp 1,870,516.81
Rp 614,077.88
Rp 1,440,616.65
Rp 177,961.00
Rp 105,261.26
Rp 1,513,449.64
Rp 11,368,541.45
ANALISA HARGA SATUAN PEKERJAAN PEN

Harga Satuan (Rp)


NO URAIAN KOEF SAT
Upah Bahan
1 2 3 4 5 6
M PEKERJAAN PENGECATAN
M.1 Pengecatan 1 m2 Bidang Kayu
Pekerja 0.07 Oh Rp 95,600.00 -
Tukang Cat 0.009 Oh Rp 109,300.00 -
Kepala Tukang Cat 0.006 Oh Rp 120,000.00 -
Mandor 0.003 Oh Rp 131,000.00 -
Cat Menie Kayu A 0.2 Kg - Rp 33,000.00
Plamuur Kayu 0.15 Kg - Rp 21,578.00
Cat Dasar Kayu 0.17 Kg - Rp 31,500.00
Cat Penutup Kayu (Avian) 0.26 Kg - Rp 55,000.00
Kuas 0.01 Buah - Rp 17,500.00
Pengencer Cat (Tinner) 0.03 Ltr - Rp 25,000.00
Ampelas 0.2 Lbr - Rp 4,000.00
JUMLAH
M.2 Pengecatan 1 m2 Bidang Besi
Pekerja 0.06 Oh Rp 95,600.00 -
Tukang Cat 0.06 Oh Rp 109,300.00 -
Kepala Tukang Cat 0.012 Oh Rp 120,000.00 -
Mandor 0.003 Oh Rp 131,000.00 -
Cat Besi Avian 0.3 Kg - Rp 55,000.00
Kuas 0.1 Buah - Rp 17,500.00
Pengencer Cat (Tinner) 0.1 Ltr - Rp 25,000.00
JUMLAH
M.3 Pengecatan 1 m2 Dinding Interior
Pekerja 0.02 Oh Rp 95,600.00 -
Tukang Cat 0.063 Oh Rp 109,300.00 -
Kepala Tukang Cat 0.0063 Oh Rp 120,000.00 -
Mandor 0.003 Oh Rp 131,000.00 -
Plamuur 0.1 Kg - Rp 15,000.00
Cat Dasar Dulux
Cat Dinding Interior Vinilex 0.1 Kg - Rp 24,000.00
0.26 Kg - Rp 23,000.00
JUMLAH
M.4 Pengecatan 1 m2 Dinding Eksterior
Pekerja 0.02 Oh Rp 95,600.00 -
Tukang Cat 0.063 Oh Rp 109,300.00 -
Kepala Tukang Cat 0.0063 Oh Rp 120,000.00 -
Mandor 0.003 Oh Rp 131,000.00 -
Plamuur 0.1 Kg - Rp 15,000.00
Cat Dasar Dulux
Dinding Eksterior 0.1 Kg - Rp 24,000.00
Vinilex 0.26 Kg - Rp 42,100.00
JUMLAH
PEKERJAAN PENGECATAN

an (Rp) Jumlah Harga (Rp)


Jumlah (Rp) No
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10) 1
AAN PENGECATAN M
M.1
- Rp 6,692.00 - - Rp 6,692.00
- Rp 983.70 - - Rp 983.70
- Rp 720.00 - - Rp 720.00
- Rp 393.00 - - Rp 393.00
- - Rp 6,600.00 - Rp 6,600.00
- - Rp 3,236.70 - Rp 3,236.70
- - Rp 5,355.00 - Rp 5,355.00
- - Rp 14,300.00 - Rp 14,300.00
- - Rp 175.00 - Rp 175.00
- - Rp 750.00 - Rp 750.00
- - Rp 800.00 - Rp 800.00
Rp 8,788.70 Rp 31,216.70 - Rp 40,005.40

- Rp 5,736.00 - - Rp 5,736.00
No
- Rp 6,558.00 - - Rp 6,558.00
- Rp 1,440.00 - - Rp 1,440.00 1
- Rp 393.00 - - Rp 393.00 M.2
- - Rp 16,500.00 - Rp 16,500.00
- - Rp 1,750.00 - Rp 1,750.00
- - Rp 2,500.00 - Rp 2,500.00
Rp 14,127.00 Rp 20,750.00 - Rp 34,877.00

- Rp 1,912.00 - - Rp 1,912.00
- Rp 6,885.90 - - Rp 6,885.90
- Rp 756.00 - - Rp 756.00
- Rp 393.00 - - Rp 393.00
- - Rp 1,500.00 - Rp 1,500.00
No
- - Rp 2,400.00 - Rp 2,400.00
- - Rp 5,980.00 - Rp 5,980.00 1
Rp 9,946.90 Rp 9,880.00 - Rp 19,826.90 M.3

- Rp 1,912.00 - - Rp 1,912.00
- Rp 6,885.90 - - Rp 6,885.90
- Rp 756.00 - - Rp 756.00
- Rp 393.00 - - Rp 393.00
- - Rp 1,500.00 - Rp 1,500.00
- - Rp 2,400.00 - Rp 2,400.00
- - Rp 10,946.00 - Rp 10,946.00
Rp 9,946.90 Rp 14,846.00 - Rp 24,792.90
No
1
M.4
REKAPITULASI KEBUTUHAN TENAGA KERJA DAN B

Harga Satuan (Rp)


Uraian Pekerjaan Vol Koef Satuan
Upah
2 3 4 5 6
PEKERJAAN PENGEC
Pengecatan 1 m2 Bidang Kayu 77.20 - m2
Pekerja 0.07 Oh Rp 95,600.00
Tukang Cat 0.009 Oh Rp 109,300.00
Kepala Tukang Cat 0.006 Oh Rp 120,000.00
Mandor 0.003 Oh Rp 131,000.00
Cat Menie Kayu A 0.2 Kg -
Plamuur Kayu 0.15 Kg -
Cat Dasar Kayu 0.17 Kg -
Cat Penutup Kayu (Avian) 0.26 Kg -
Kuas 0.01 Buah -
Pengencer Cat (Tinner) 0.03 Ltr -
Ampelas 0.2 Lbr -

Harga Satuan (Rp)


Uraian Pekerjaan Vol Koef Satuan
Upah
2 3 4 5 6
Pengecatan 1 m2 Bidang Besi 41.770 - m2
Pekerja 0.06 Oh Rp 95,600.00
Tukang Cat 0.06 Oh Rp 109,300.00
Kepala Tukang Cat 0.012 Oh Rp 120,000.00
Mandor 0.003 Oh Rp 131,000.00
Cat Besi Avian 0.3 Kg -
Kuas 0.1 Buah -
Pengencer Cat (Tinner) 0.1 Ltr -

Harga Satuan (Rp)


Uraian Pekerjaan Vol Koef Satuan
Upah
2 3 4 5 6
Pengecatan 1 m2 Dinding Interior 534.9070 - m2
Pekerja 0.02 Oh Rp 95,600.00
Tukang Cat 0.063 Oh Rp 109,300.00
Kepala Tukang Cat 0.0063 Oh Rp 120,000.00
Mandor 0.003 Oh Rp 131,000.00
Plamuur 0.1 Kg -
Cat Dasar Dulux 0.1 Kg -
Cat Dinding Interior Vinilex 0.26 Kg -

Harga Satuan (Rp)


Uraian Pekerjaan Vol Koef Satuan
Upah
2 3 4 5 6
Pengecatan 1 m2 Dinding Eksterior 615.053 - m2
Pekerja 0.02 Oh Rp 95,600.00
Tukang Cat 0.063 Oh Rp 109,300.00
Kepala Tukang Cat 0.0063 Oh Rp 120,000.00
Mandor 0.003 Oh Rp 131,000.00
Plamuur 0.1 Kg -
Cat Dasar Dulux 0.1 Kg -
Cat Dinding Eksterior Vinilex 0.26 Kg -
TENAGA KERJA DAN BAHAN PEKERJAAN PENGECATAN

Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)


Bahan Alat Upah Bahan Alat Upah
7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)
PEKERJAAN PENGECATAN

- - 5.403944 - - Rp 516,617.05
- - 0.6947928 - - Rp 75,940.85
- - 0.4631952 - - Rp 55,583.42
- - 0.2315976 - - Rp 30,339.29
Rp 33,000.00 - - 15.43984 - -
Rp 21,578.00 - - 11.57988 - -
Rp 31,500.00 - - 13.123864 - -
Rp 55,000.00 - - 20.071792 - -
Rp 17,500.00 - - 0.771992 - -
Rp 25,000.00 - - 2.315976 - -
Rp 4,000.00 - - 15.43984 - -
Jumlah Rp 678,480.61
Total Rp 3,088,38
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat Upah
7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

- - 2.506218 - - Rp 239,594.44
- - 2.506218 - - Rp 273,929.63
- - 0.5012436 - - Rp 60,149.23
- - 0.1253109 - - Rp 16,415.73
Rp 55,000.00 - - 12.53109 - -
Rp 17,500.00 - - 4.17703 - -
Rp 25,000.00 - - 4.17703 - -
Jumlah Rp 590,089.03
Total Rp 1,456,82
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat Upah
7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

- - 10.69814 - - Rp 1,022,742.18
- - 33.699141 - - Rp 3,683,316.11
- - 3.3699141 - - Rp 404,389.69
- - 1.604721 - - Rp 210,218.45
Rp 15,000.00 - - 53.4907 - -
Rp 24,000.00 - - 53.4907 - -
Rp 23,000.00 - - 139.07582 - -
Jumlah Rp 5,320,666.44
Total Rp 10,605,54
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat Upah
7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)

- - 12.30106 - - Rp 1,175,981.34
- - 38.748339 - - Rp 4,235,193.45
- - 3.8748339 - - Rp 464,980.07
- - 1.845159 - - Rp 241,715.83
Rp 15,000.00 - - 61.5053 - -
Rp 24,000.00 - - 61.5053 - -
Rp 42,100.00 - - 159.91378 - -
Jumlah Rp 6,117,870.69
Total Rp 15,248,94
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
Daun Pintu/Jendela (m)
Type Jumlah Type
Panjang
- - 0.8
P1 4
- - 0.8
- -
P2 3 0.7
- -
Rp 509,514.72 -
P2* 1 0.7
Rp 249,870.65 -
Rp 413,401.72 -
P4 1 0.8
Rp 1,103,948.56 -
Rp 13,509.86 -
PJ3 1 0.8
Rp 57,899.40 -
Rp 61,759.36 -
PJ4 1 0.8
Rp 2,409,904.27 -
3,088,384.88
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)

- -
- -
- -
Tipe Gambar
- -
Rp 689,209.95 -
Rp 73,098.03 -
Rp 104,425.75 -
A
Rp 866,733.73 -
1,456,822.75
Harga Material (Rp)
Bahan Alat
B Gambar Terlampir
13 = (7 x 10) 14 = (8 x 11)

- -
- -
- - C
- -
Rp 802,360.50 -
C

Rp 1,283,776.80 -
Rp 3,198,743.86 -
Rp 5,284,881.16 -
10,605,547.60
Harga Material (Rp)
Bahan Alat D
13 = (7 x 10) 14 = (8 x 11)

- -
- -
- -
- -
Rp 922,579.50 -
Rp 1,476,127.20 - E
Rp 6,732,370.14 -
Rp 9,131,076.84 -
15,248,947.52
TOTA

Volume Balkon (m2)


Panjang 1 = 0.670
Panjang 2 = 4.160
Panjang 3 = 2.600
Tinggi = 0.810
Luas 1 = 0.543
Luas 2 = 3.370
Luas 3 = 2.106
Total = 14.258

LANTAI 1

No Elevasi (m) Nama Ruangan

1 1.90 Garasi
2 3.00 Teras
3 3.00 Tangga 1
4 2.70 Kamar Mandi/WC
5 3.00 Foyer
6 3.00 Ruang Tamu
7 3.00 Ruang Keluarga
8 3.00 Ruang Makan
9 3.00 Dapur
10 3.00 Ruangan Tambahan
11 3.00 Ruang Tidur Utama
12 3.00 Kamar Mandi Utama
TOTAL VOLUME PLAFOND GYPSU

Dinding Ekterior
Depan Belakang
F1-G1 E10-G10
D1-F1 E7-E10
1'D-3D B7-E7
Lantai 1 3C-3D 7B-10B
1'C-3C A10-B10
A2-C2

Lantai 2 A3-C3 E7-G7


1C-3C C7-E7
2C-2D A7-C7
Tambahan
1D-1F
1F-1G
Total Luas (m2)
Total Luas Dinding Eksterior (m2)
Vol. Acian Eksterior (2xLuas Dinding)
PERHITUNGAN VOLUME PEKERJAAN PENGECATA

Bidang Kayu (Kusen dan Daun Pintu)

Daun Pintu/Jendela (m) Tiang (m)


Tinggi Sisi Cat Panjang Sisi Cat Lebar Sisi Cat Tinggi
2.1 2 0.15 2 0.05 4 2.45
0.4 2

2.1 2 0.15 2 0.05 4 2.15

2.1 2 0.15 2 0.05 4 2.15

2.1 2 0.15 2 0.05 4 2.15

2.1 2 - - - - -

2.1 4 - - - - -

JUMLAH (M2)

TOTAL (M2)

Bidang Kayu (Ralling Tangga)

Dimensi (m)
Panjang (m)
a b c d e f

0.08 0.08 0.12 0.08 0.02 0.028 3

Lebar (m) Tinggi (m)


3
0.12 0.76

0.076 0.3 0.05


0.076 0.3 0.05

0.12 1.12 0.6

0.076 0.3 0.05

TOTAL LUAS (M2)

Bidang Besi

) Tipe Pintu Panjang (m) Tinggi (m) Jumlah


m PB 0.8 2.15 1
m
m Tipe Pintu Panjang (m) Tinggi (m) Jumlah
m Pintu Garasi 5.1 2.36 1
m2
m2
m2
m2

Bidang Plafond

LANTAI 1

As Verikal Panjang (m) As Horizontal Lebar (m) Luas (m2) No


2A-4A 3.7 A1-C1 5.4 19.9800 1
4A-5A 1.8 A1-C1' 5.563 10.0134 2
1C-3C 2 C1-D1 3 6.0000 3
5A-6A 1 A1-B1 2.948 2.9480 4
4A-5A 1.8 C'4-D'4 1.5 2.7000 5
3C-4C 2.2 C3-D3 3 6.6000
6
1D-4D 4.2 D1-F1 3.4 14.2800
4D-7D 5.8 D4-G4 5.6 32.4800 7
5B-7B 4 B5-D5 5.25 21.0000
6A-7A 3 6A-6B 3.15 9.4500 8
4D-5D 1.8 D'4 - D4 0.91 1.6380
7E-9E 8 E9-G9 4 32.0000
TO
9E-10E 2 E10-G10 4 8.0000
OLUME PLAFOND GYPSUM LT 1 167.0894

Bidang Dinding Interior & Eksterior

Luas (m2)
Vol. Pengecatan Dinding Interior (m2)
Depan Belakang
8.316 13.6 Luas Acian Seluruh Dinding - Luas Acian Dinding E
12.852 34.3 1149.96-615.053
9.45 25.893 534.907
11.34 34.3
9.45 10.8
20.412

20.547 15.22
7.61 17.503
11.415 20.547
1.9025
13.698
8.371
135.3635 172.163
307.5265
615.053
ERJAAN PENGECATAN

Daun Pintu)

Ambang (m) Volume (m2)


Panjang Sisi Cat Lebar Sisi Cat Tinggi Daun Tiang
0.15 1 0.05 2 0.9 13.44 4.9
2.56

0.15 1 0.05 2 0.8 8.82 1.075

0.15 1 0.05 2 0.8 2.94 1.075

0.15 1 0.05 2 0.9 3.36 1.075

- - - - - 3.36 -

- - - - - 6.72 -

41.2 8.125

50.85

Tangga)

Luas (m2)
Luas 1 Luas 2 Luas 3 Luas 4

0.0212 0.36 0.168 0.24

7.92

0.756
0.756

16.128

0.756

26.35

Volume (m2)
3.44

Volume (m2)
24.072

LANTAI 2

Elevasi (m) Nama Ruangan As Verikal Panjang (m) As Horizontal Lebar (m) Luas (m2)
6.78 Tangga 2 1F-6F 6 F1-G1 2.2 13.2000
6.78 Ruang Tidur 1 5E-7E 4 E5-G5 4 16.0000
6.78 Ruang Tidur 2 5C-7C 4 C5-E5 4.6 18.4000
6.78 Ruang Tidur 3 4A-7A 5.8 A4-C4 5.4 31.3200
6.34 Toilet 1 3A-4A 3.7 A3-C3 2.93 10.8410
3C-3'C 1.183 B3-C3 2.315 2.7386
6.34 Toilet 2
3'C-3'D 1.107 B3-C'3 1.65 1.8266
6.78 Hall 1E-5E 6 E1-F1 1.8 10.8000
1E-5E 6 D1-E1 1.6 9.6000
6.78 Ruang Keluarga 2C-5C 5.5 C2-D2 3 16.5000
3'C-3'D 1.107 C'3-C3 0.6 0.6642
TOTAL VOLUME PLAFOND GYPSUM LT 2 131.8904

& Eksterior

tan Dinding Interior (m2)


ding - Luas Acian Dinding Eksterior
49.96-615.053
534.907
NO URAIAN PEKERJAAN VOL
1 2 3
olume (m2) M.1 Pengecatan 1 m2 Bidang Kayu 77.20
Ambang M.2 Pengecatan 1 m2 Bidang Besi 41.77
0.9 M.3 Pengecatan 1 m2 Dinding Interior 534.91
M.4 Pengecatan 1 m2 Dinding Eksterior 615.05
Total Anggaran Biaya
0.2
No Tenaga Kerja Satuan
0.2
1 2 3
1 Pekerja Oh
0.225
2 Tukang Cat Oh
3 Kepala Tukang Cat Oh
-
4 Mandor Oh
TOTAL
-
No Bahan Satuan
1.525
1 2 3
1 Cat Menie Kayu A Kg
50.85
2 Plamuur Kayu Kg
3 Cat Dasar Kayu Kg
4 Cat Penutup Kayu (Avian) Kg
5 Kuas Buah
6 Pengencer Cat (Tinner) Ltr
7 Ampelas Lbr
8 Planmuur Kg
0 Cat Dasar Dulux Kg
10 Cat Besi Avian Kg
11 Cat Dinding Interior Vinilex Kg
12 Cat Dinding Eksterior Vinilex Kg
TOTAL
RENCANA ANGGARAN BIAYA PEKERJAAN PENGECATAN

HARGA SATUAN JUMLAH HARGA


SAT
UPAH BAHAN UPAH BAHAN
4 5 6 7 = (3x5) 8 = (3x6)
m2 Rp 8,788.70 Rp 31,216.70 Rp 678,480.61 Rp 2,409,904.27
m2 Rp 14,127.00 Rp 20,750.00 Rp 590,089.03 Rp 866,733.73
m2 Rp 9,946.90 Rp 9,880.00 Rp 5,320,666.44 Rp 5,284,881.16
m2 Rp 9,946.90 Rp 14,846.00 Rp 6,117,870.69 Rp 9,131,076.84
Total Anggaran Biaya Rp 12,707,106.76 Rp 17,692,595.99

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah


3 4 5 6 = (4 x 5)
Oh 30.909 Rp 95,600.00 Rp 2,954,935.01
Oh 75.648 Rp 109,300.00 Rp 8,268,380.04
Oh 8.209 Rp 120,000.00 Rp 985,102.42
Oh 3.807 Rp 131,000.00 Rp 498,689.29
TOTAL Rp 12,707,106.76

Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Bahan


3 4 5 6 = (4 x 5)
Kg 15.44 Rp 33,000.00 Rp 509,514.72
Kg 11.58 Rp 21,578.00 Rp 249,870.65
Kg 13.12 Rp 31,500.00 Rp 413,401.72
Kg 20.07 Rp 55,000.00 Rp 1,103,948.56
Buah 4.95 Rp 17,500.00 Rp 86,607.89
Ltr 6.49 Rp 25,000.00 Rp 162,325.15
Lbr 15.44 Rp 4,000.00 Rp 61,759.36
Kg 115.00 Rp 15,000.00 Rp 1,724,940.00
Kg 115.00 Rp 24,000.00 Rp 2,759,904.00
Kg 12.53 Rp 55,000.00 Rp 689,209.95
Kg 139.08 Rp 23,000.00 Rp 3,198,743.86
Kg 159.91 Rp 42,100.00 Rp 6,732,370.14
TOTAL Rp 17,692,595.99
NGECATAN

TOTAL HARGA
(UPAH+BAHAN)
9 = (7+8)
Rp 3,088,384.88
Rp 1,456,822.75
Rp 10,605,547.60
Rp 15,248,947.52
Rp 30,399,702.75
REKAPITULASI TENAGA KERJA

No Tenaga Kerja Satuan


1 2 3
1 Pekerja Oh
2 Tukang Batu Oh
3 Tukang Kayu Oh
4 Tukang Cat Oh
5 Tukang Listrik Oh
6 Tukang Besi Oh
7 Tukang Khusus Alumunium Oh
8 Kepala Tukang Batu Oh
9 Kepala Tukang Kayu Oh
10 Kepala Tukang Cat Oh
11 Kepala Tukang Listrik Oh
12 Kepala Tukang Besi Oh
13 Kepala Tukang Khusus Alumunium Oh
14 Mandor Oh
TOTAL
ITULASI TENAGA KERJA

Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah


4 5 6 = (4 x 5)
2722.198 Rp 95,600.00 Rp 260,242,123.99
770.500 Rp 109,300.00 Rp 84,215,631.56
700.774 Rp 109,300.00 Rp 76,594,646.34
75.648 Rp 109,300.00 Rp 8,268,380.04
31.200 Rp 109,300.00 Rp 3,410,160.00
31.372 Rp 109,300.00 Rp 3,428,907.72
16.461 Rp 109,300.00 Rp 1,799,223.81
83.185 Rp 120,000.00 Rp 9,982,159.78
62.190 Rp 120,000.00 Rp 7,462,805.29
8.209 Rp 120,000.00 Rp 985,102.42
3.120 Rp 120,000.00 Rp 374,400.00
3.137 Rp 120,000.00 Rp 376,458.30
1.646 Rp 120,000.00 Rp 197,536.01
158.520 Rp 131,000.00 Rp 20,766,057.92
TAL Rp 478,103,593.17
REKAPITULASI

No
1
1
2
3
4
5
6
7
8
9
10
11
121
3
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
46
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
84
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
TOTAL
REKAPITULASI BAHAN

Bahan Satuan
2 3
Dolken Kayu φ 8 - 10 / 400 cm Batang
Kayu Meranti Kaso 5/7 m3
Kayu Meranti Papan 3/20 m3
Kayu Meranti Balok 6/12 m3
Polywood, t=4mm Lbr
Pasir pasang m3
Pasir Beton m3
Semen Portland Kg
Batu Koral Beton Kali m3
Cat Meni Besi Liter
Cat SEIV Gloss Warna Standar Liter
Paku 2" - 3" Kg
Kunci Tanam Bh
Jendela nako + accessories Set
Paku 2" - 5" Kg
Batu bata merah bakar kualitas I bh
Besi Strip bh
Kaca Polos tebal 3 mm m2
Seng Gelombang BJLS 25, Uk 90 x 180 cm Lbr
Batu Belah Pondasi m3
Koral Beton m3
Besi Beton Polos kg
Kawat Beton kg
Paku 8-12 cm kg
Minyak Bekisting Ltr
PC (50Kg) zak
Split Pecah Mesin 2/3 m3
Besi Beton Ulir kg
Pasir Beton Kg
Kerikil Kg
Air Liter
Kayu Kelas III (Papan Albasia) m3
Paku 5-10 cm Kg
Balok Kayu Kelas II (Balok Albasia) m3
Triplek 9 mm 120 x 240 Lembar
Keramik Dinding 20x25 Roman Polos Buah
Semen Warna Kg
Balok Kayu Kamper Samarinda m3
Paku 10 cm Kg
Lem Kayu Kg
Profil Alumunium m
Skrup Fixer Buah
Sealant Tube
Kayu Papan Samarinda m3
Paku 1" - 2,5" Kg
Teakwood, t = 4mm , 90 x 220 mm Lbr
Plat Seng Alumumium Lbr
Daun Pintu Alumunium PJ2 Buah
Daun Pintu Alumunium P3 Buah
Engsel Pintu + Baut Set
Kunci Pintu Set
Handle Tarik (BLC AAH8 SS) Pasang
Handle Tarik Buah
Daun Jendela Alumunium Set
Engsel Jendela Set
Slot Jendela Pasang
Accessories ls
Pintu Besi + Accessories m2
Glass Block Buah
Kaca Polos Tebal 5mm Asahi m2
Engsel Pintu (Stainless Eks.Otis 4"x3") Buah
Engsel Jendela (Stainless Eks.Otis 3" x 2,5") Buah
Kunci Tanam (Eks. Ses Art 2030 40mm SS) Buah
Kunci Tanam Buah
Pegangan Pintu (BLC AAH 8 SS) Buah
Kait Angin Buah
Pintu Besi Henderson m2
Pasir Urug m3
Koral Beton m3
Tanah Urug m3
Grace Wood (Costul Dev Uk. 12 x 102 x 900 mm) m2
Keramik Ukuran 50x50 Roman Polos (Golongan A) Dus (isi 4)
Keramik Ukuran 33,3 x 33,3 Roman Polos (Golongan A) Dus (Isi 9)
Keramik Ukuran 30 x 30 Roman Polos (Golongan B) Dus (11)
Keramik Ukuran 20 x 20 Roman Polos (Golongan A) Dus (25)
Keramik Ukuran 10 x 33 Roman Polos Untuk Border Buah
Kayu Papan Borneo Super m3
Paku 5 cm - 7 cm Kg
Paving Block Berwarna Tebal 6 cm (Ubin Set 21x21x6) m2
Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6) m2
Balok Kayu Borneo Kelas II m3
Besi Strip Tebal 5 mm Kg
Paku 12 cm Kg
Kaso-Kaso (5x7) cm m3
Reng (3x4) cm m3
Papan Kayu Borneo Super m3
Genting Kanmuri Milenio Buah
Gypsum Board Tebal 9 mm Lembar
Paku Sekrup Kg
Tripleks (120 x 240) Tebal 6 mm Lembar
Paku Tripleks Kg
List Gypsum m
Lem Kayu Kg
Kayu Balok Borneo 5/7 m3
List Kayu Profil m
Pipa Listrik 5/8" Batang
Kabel Prima NYM 3x2,5 m'
T dus Buah
L Bow Buah
Klem Buah
MCB Domae 1 Phase 25A Buah
Saklar Tunggal Broco Buah
Saklar Ganda Broco Buah
Saklar Hotel Pieno E8231L2F Buah
Stop Kontak Broco Buah
Stop Kontak AC Panasonic Buah
Stop Kontak Waterproof Panasonic Buah
Stop Kontak Antena TV Broco Buah
Stop Kontak Telepon Broco Buah
Kotak Pembagi (Distributor Point) Buah
Las Doof Buah
Lampu Downlight Panasonic 4 Inch Buah
Fitting Buah
Lampu LED TL Phillips Buah
Kap Lampu Buah
Lampu Taman + Tiang Buah
Closet Duduk Warna Toto Buah
PerlengkapanCloset Duduk (6% dari bahan) Set
Closet Jongkok Putih INA Buah
Wastafel Toto L 521V1A Buah
Perlengkapan Watafel (12% dari bahan) Set
Bathtube Buah
Perlengkapan Bath tube (20% dari bahan) Set
Bak Mandi Fiberglass Buah
Perlengkapan Bak Mandi (12% dari bahan) Set
Bak Cuci Piring Buah
Waterdrain Buah
Floor Drain Buah
Jet Washer Closet Buah
Tandon Air 1000L Buah
Perlengkapan Tandon Air (12% dari Bahan) Set
Kran Air Buah
Seal Tape Buah
Jet Shower Buah
Perlengkapan Jet Shower Set
Pipa PVC 1" Rucika m
Perlengkapan Pipa PVC 1"(35% dari bahan) set
Pipa PVC 1/2" Rucika m
Perlengkapan Pipa PVC 1/2" (35% dari bahan) set
Pipa PVC 3/4 " Rucika m
Perlengkapan Pipa PVC 3/4" (35% dari bahan) Set
Pipa PVC 1 1/4" Rucika m
Perlengkapan Pipa PVC 1 1/4" (35% dari bahan) set
Pipa PVC 2" Rucika m
Perlengkapan Pipa PVC 2" (35% dari bahan) set
Pipa PVC 3" Rucika m
Perlengkapan Pipa PVC 3" (35% dari bahan) set
Pipa PVC 4" Rucika m
Perlengkapan Pipa PVC 4" (35% dari bahan) set
Kerikil m3
Baja Tulangan Kg
Pipa PVC 4" m
Batu Split Pecah Mesin 1/2 m3
Galian Tanah m3
Pipa GIP 1.5 m3
Galian Tanah untuk Rembesan m3
Pas. Ijuk m2
Urugan Kembali/Perataan Tanah m3
Plat Penutup Beton m3
Besi Strip Tebal 3mm Kg
Baut M12 Kg
Kayu Balok Rasmala m3
Kayu Papan Borneo Super m3
Rangka Besi Hollow m'
Pengelasan m3
Pipa Besi Diameter 2-3" m'
Perlengkapan %
Batu Tempel Hitam buah
Koral Beton m3
Cat Menie Kayu A Kg
Plamuur Kayu Kg
Cat Dasar Kayu Kg
Cat Penutup Kayu (Avian) Kg
Kuas Buah
Pengencer Cat (Tinner) Ltr
Ampelas Lbr
Planmuur Kg
Cat Dasar Dulux Kg
Cat Besi Avian Kg
Cat Dinding Interior Vinilex Kg
Cat Dinding Eksterior Vinilex Kg
TOTAL
I BAHAN

Jumlah Kebutuhan Harga Satuan (Rp) Biaya Bahan


4 5 6 = (4 x 5)
2158.994 Rp 25,000.00 Rp 53,974,860.50
2.059 Rp 2,400,000.00 Rp 4,942,080.00
5.435 Rp 3,000,000.00 Rp 16,305,900.00
2.085 Rp 2,800,000.00 Rp 5,837,664.00
1.935 Rp 58,300.00 Rp 112,810.50
137.533 Rp 224,500.00 Rp 30,876,085.81
47.543 Rp 250,000.00 Rp 11,885,715.77
81706.218 Rp 1,100.00 Rp 89,876,840.13
2.690 Rp 258,750.00 Rp 695,908.13
12.600 Rp 20,250.00 Rp 255,150.00
0.072 Rp 55,000.00 Rp 3,960.00
3.475 Rp 25,000.00 Rp 86,870.00
1.838 Rp 125,000.00 Rp 229,687.50
2.450 Rp 395,000.00 Rp 967,750.00
5.460 Rp 30,000.00 Rp 163,800.00
95172.386 Rp 700.00 Rp 66,620,670.20
13.475 Rp 56,500.00 Rp 761,337.50
0.980 Rp 80,000.00 Rp 78,400.00
38.463 Rp 55,000.00 Rp 2,115,437.50
77.664 Rp 258,750.00 Rp 20,095,560.00
16.538 Rp 148,100.00 Rp 2,449,269.42
9316.870 Rp 9,500.00 Rp 88,510,266.73
150.937 Rp 25,000.00 Rp 3,773,433.85
6.060 Rp 15,000.00 Rp 90,900.00
113.916 Rp 16,500.00 Rp 1,879,609.31
0.935 Rp 53,000.00 Rp 49,573.38
0.220 Rp 195,120.00 Rp 42,904.33
1248.745 Rp 11,425.00 Rp 14,266,906.92
41557.038 Rp 179.00 Rp 7,438,709.81
62335.557 Rp 139.00 Rp 8,664,642.43
12800.520 Rp 8.00 Rp 102,404.16
31.859 Rp 1,815,000.00 Rp 57,824,210.96
192.008 Rp 15,000.00 Rp 2,880,122.82
10.180 Rp 1,705,000.00 Rp 17,357,342.28
237.539 Rp 111,000.00 Rp 26,366,871.85
1937.298 Rp 4,675.00 Rp 9,056,868.15
317.734 Rp 15,000.00 Rp 4,766,003.40
0.472 Rp 8,500,000.00 Rp 4,008,600.00
0.491 Rp 15,000.00 Rp 7,368.75
68.347 Rp 15,000.00 Rp 1,025,207.25
184.732 Rp 117,500.00 Rp 21,705,986.50
335.876 Rp 283.33 Rp 95,163.75
12.494 Rp 25,000.00 Rp 312,360.76
0.489 Rp 9,000,000.00 Rp 4,405,330.80
0.587 Rp 25,000.00 Rp 14,684.44
19.579 Rp 120,000.00 Rp 2,349,509.76
9.790 Rp 26,400.00 Rp 258,446.07
2.000 Rp 1,800,000.00 Rp 3,600,000.00
1.000 Rp 1,100,000.00 Rp 1,100,000.00
3.000 Rp 55,000.00 Rp 165,000.00
2.000 Rp 225,000.00 Rp 450,000.00
1.000 Rp 200,000.00 Rp 200,000.00
2.000 Rp 200,000.00 Rp 400,000.00
19.000 Rp 600,000.00 Rp 11,400,000.00
38.000 Rp 45,000.00 Rp 1,710,000.00
19.000 Rp 25,000.00 Rp 475,000.00
19.000 Rp 50,000.00 Rp 950,000.00
2.580 Rp 642,000.00 Rp 1,656,360.00
2.000 Rp 20,000.00 Rp 40,000.00
28.119 Rp 116,600.00 Rp 3,278,711.79
48.000 Rp 41,500.00 Rp 1,992,000.00
36.000 Rp 35,000.00 Rp 1,260,000.00
29.000 Rp 210,000.00 Rp 6,090,000.00
4.000 Rp 33,000.00 Rp 132,000.00
14.000 Rp 200,000.00 Rp 2,800,000.00
18.000 Rp 25,000.00 Rp 450,000.00
13.240 Rp 1,600,000.00 Rp 21,183,360.00
1.524 Rp 224,500.00 Rp 342,159.55
1.436 Rp 148,100.00 Rp 212,739.80
36.574 Rp 50,000.00 Rp 1,828,718.10
106.071 Rp 325,000.00 Rp 34,473,075.00
130.169 Rp 123,500.00 Rp 16,075,848.65
38.019 Rp 97,000.00 Rp 3,687,794.99
31.873 Rp 87,000.00 Rp 2,772,947.52
35.806 Rp 87,000.00 Rp 3,115,126.35
132.139 Rp 11,000.00 Rp 1,453,524.60
0.360 Rp 5,500,000.00 Rp 1,977,525.00
120.164 Rp 16,000.00 Rp 1,922,617.51
21.558 Rp 110,000.00 Rp 2,371,362.84
4.098 Rp 80,000.00 Rp 327,821.76
3.688 Rp 4,750,000.00 Rp 17,519,025.48
50.294 Rp 32,000.00 Rp 1,609,403.30
14.283 Rp 15,000.00 Rp 214,246.09
2.399 Rp 3,500,000.00 Rp 8,395,851.64
9.767 Rp 3,000,000.00 Rp 29,299,808.78
0.622 Rp 5,500,000.00 Rp 3,420,192.60
1884.783 Rp 11,200.00 Rp 21,109,569.84
108.829 Rp 65,000.00 Rp 7,073,861.95
32.888 Rp 40,000.00 Rp 1,315,511.10
15.399 Rp 85,000.00 Rp 1,308,911.65
1.232 Rp 20,000.00 Rp 24,638.34
170.173 Rp 21,000.00 Rp 3,573,639.30
7.735 Rp 15,000.00 Rp 116,027.25
4.604 Rp 4,750,000.00 Rp 21,870,372.00
48.399 Rp 14,000.00 Rp 677,581.80
306.000 Rp 5,250.00 Rp 1,606,500.00
1530.000 Rp 10,800.00 Rp 16,524,000.00
102.000 Rp 6,000.00 Rp 612,000.00
6.000 Rp 1,100.00 Rp 6,600.00
744.000 Rp 200.00 Rp 148,800.00
1.000 Rp 56,900.00 Rp 56,900.00
11.000 Rp 15,000.00 Rp 165,000.00
13.000 Rp 17,500.00 Rp 227,500.00
2.000 Rp 25,900.00 Rp 51,800.00
27.000 Rp 15,000.00 Rp 405,000.00
7.000 Rp 34,800.00 Rp 243,600.00
4.000 Rp 42,000.00 Rp 168,000.00
4.000 Rp 38,000.00 Rp 152,000.00
3.000 Rp 35,000.00 Rp 105,000.00
2.000 Rp 62,500.00 Rp 125,000.00
84.000 Rp 300.00 Rp 25,200.00
26.000 Rp 54,000.00 Rp 1,404,000.00
26.000 Rp 15,000.00 Rp 390,000.00
2.000 Rp 73,000.00 Rp 146,000.00
2.000 Rp 22,500.00 Rp 45,000.00
2.000 Rp 214,025.00 Rp 428,050.00
4.000 Rp 2,085,000.00 Rp 8,340,000.00
4.000 Rp 125,100.00 Rp 500,400.00
1.000 Rp 151,250.00 Rp 151,250.00
4.800 Rp 2,602,000.00 Rp 12,489,600.00
4.000 Rp 312,240.00 Rp 1,248,960.00
2.000 Rp 2,500,000.00 Rp 5,000,000.00
2.000 Rp 500,000.00 Rp 1,000,000.00
1.000 Rp 500,000.00 Rp 500,000.00
1.000 Rp 60,000.00 Rp 60,000.00
1.000 Rp 195,400.00 Rp 195,400.00
1.000 Rp 100,000.00 Rp 100,000.00
5.000 Rp 280,000.00 Rp 1,400,000.00
4.000 Rp 94,000.00 Rp 376,000.00
1.000 Rp 1,200,000.00 Rp 1,200,000.00
1.000 Rp 144,000.00 Rp 144,000.00
5.000 Rp 176,000.00 Rp 880,000.00
0.125 Rp 60,000.00 Rp 7,500.00
2.000 Rp 94,000.00 Rp 188,000.00
2.000 Rp 80,000.00 Rp 160,000.00
41.864 Rp 14,125.00 Rp 591,334.65
34.887 Rp 4,943.75 Rp 172,472.61
45.926 Rp 8,125.00 Rp 373,152.00
38.272 Rp 2,843.75 Rp 108,836.00
71.444 Rp 10,000.00 Rp 714,444.00
59.537 Rp 3,500.00 Rp 208,379.50
30.436 Rp 16,250.00 Rp 494,578.50
25.363 Rp 5,687.50 Rp 144,252.06
31.448 Rp 38,500.00 Rp 1,210,763.40
26.207 Rp 13,475.00 Rp 353,139.33
58.566 Rp 58,750.00 Rp 3,440,752.50
48.805 Rp 20,562.50 Rp 1,003,552.81
73.378 Rp 95,000.00 Rp 6,970,872.00
61.148 Rp 33,250.00 Rp 2,033,171.00
1.182 Rp 250,000.00 Rp 295,500.00
24.250 Rp 12,000.00 Rp 291,000.00
9.000 Rp 95,000.00 Rp 855,000.00
0.033 Rp 250,000.00 Rp 8,250.00
4.500 Rp 70,000.00 Rp 315,000.00
1.200 Rp 75,000.00 Rp 90,000.00
2.250 Rp 56,814.00 Rp 127,831.50
5.400 Rp 250,000.00 Rp 1,350,000.00
1.130 Rp 50,000.00 Rp 56,500.00
0.300 Rp 2,537,064.00 Rp 761,119.20
1.889 Rp 25,000.00 Rp 47,223.00
6.869 Rp 3,000.00 Rp 20,606.40
0.021 Rp 4,000,000.00 Rp 82,425.60
0.011 Rp 5,500,000.00 Rp 59,400.00
49.904 Rp 25,000.00 Rp 1,247,601.25
3.861 Rp 230,000.00 Rp 888,063.96
8.916 Rp 65,500.00 Rp 583,998.00
2.601 Rp 18,000.00 Rp 46,809.00
14.225 Rp 9,000.00 Rp 128,026.80
1.204 Rp 224,500.00 Rp 270,317.17
15.440 Rp 33,000.00 Rp 509,514.72
11.580 Rp 21,578.00 Rp 249,870.65
13.124 Rp 31,500.00 Rp 413,401.72
20.072 Rp 55,000.00 Rp 1,103,948.56
4.949 Rp 17,500.00 Rp 86,607.89
6.493 Rp 25,000.00 Rp 162,325.15
15.440 Rp 4,000.00 Rp 61,759.36
114.996 Rp 15,000.00 Rp 1,724,940.00
114.996 Rp 24,000.00 Rp 2,759,904.00
12.531 Rp 55,000.00 Rp 689,209.95
139.076 Rp 23,000.00 Rp 3,198,743.86
159.914 Rp 42,100.00 Rp 6,732,370.14
Rp 933,025,548.18
No
1
A. PEKERJAAN PERSIAPAN
A.1
A.2
A.3
A.4
A.5
A.6
Total Anggaran Biaya
B. PEKERJAAN TANAH
B.1
B.2
Total Anggaran Biaya
C. PEKERJAAN PONDASI
C.1 Pondasi Batu Kali
C.1.1
C.1.2
C.1.3
C.1.4
C.2 Pondasi Rollag Bata
C.2.1
C.3 Pondasi Strauss Pile (Kedalaman 6 meter)
C.3.1 Pemasangan Pile Cap
C.3.1.1
C.3.1.2
C.3.1.3
C.3.1.4
C.3.2 Pemasangan Strauss Pile (Kedalaman 6m)
C.3.2.1
C.3.2.2
Total Anggaran Biaya
D. PEKERJAAN STRUKTUR
D.1
D.1.1
D.1.2
D.1.3
D.1.4
D.2
D.2.1
D.2.2
D.2.3
D.2.4
D.3
D.3.1
D.3.2
D.3.3
D.3.4
D.4
D.4.1
D.4.2
D.3.4
D.5
D.5.1
D.5.2
D.5.3
D.6
D.6.1
D.6.2
D.6.3
D.7.1
D.7.1
D.7.2
D.7.3
Total Anggaran Biaya
E. PEKERJAAN DINDING
E.1
E.2
E.3
E.4
E.5
E.6
Total Anggaran Biaya
F. PEKERJAAN PINTU DAN JENDELA
F.1
F.2
F.3
F.4
F.5
F.6
F.7
F.8
F.9
F.10
F.11
F.12
F.13
F.14
F.15
F.16
Total Anggaran Biaya
G. PEKERJAAN LANTAI
G.1
G.2
G.3
G.4
G.5
G.6
G.7
G.8
G.9
G.10
G.11
G.12
Total Anggaran Biaya
H. PEKERJAAN ATAP
H.1
H.2
H.3
H.4
H.5
Total Anggaran Biaya
I. PEKERJAAN PLAFOND
I.1
I.2
I.3
1.4
1.5
Total Anggaran Biaya
J. PEKERJAAN ELEKTRIKAL
J.1
J.2
J.3
J.4
J.5
J.6
J.7
J.8
J.9
J.10
J.11
J.12
J.13
Total Anggaran Biaya
K. PEKERJAAN SANITASI
K.1
K.2
K.3
K.4
K.5
K.6
K.7
K.8
K.9
K.10
K.11
K.12
K.13
K.14
K.15
K.16
K.17
K.18
K.19
K.20
Total Anggaran Biaya
L. PEKERJAAN LAIN-LAIN
L.1
L.2
L.3
L.4
L.5
L.6
L.7
L.8
L.9
L.10
L.11
Total Anggaran Biaya
M. PEKERJAAN PENGECATAN
M.1
M.2
M.3
M.4
Total Anggaran Biaya
TOTAL RENCANA ANGGARAN B
RENCAN

Urutan Pekerjaan Volume


2 3
A. PEKERJAAN PERSIAPAN
Pembersihan Lapangan 420
Pembuatan Pagar Sementara 28
Pembuatan Direksi Keet 12.25
Pembuatan Los Kerja 12
Pembuatan Papan Nama Proyek 0.72
Pemasangan Bouwplank 173.74
Total Anggaran Biaya
B. PEKERJAAN TANAH
Penggalian Tanah Biasa Sedalam 1 m 149.66
Pengurugan dengan Tanah Urug 47.53
Total Anggaran Biaya
C. PEKERJAAN PONDASI
C.1 Pondasi Batu Kali
Pemasangan Pondasi Batu Belah 1 SP : 4 PP 64.72
Pembuatan Beton Mutu K225 18.234
Pembesian 1 Kg dengan Besi Polos 330.7509
Pemasangan Bekisting 16.8
C.2 Pondasi Rollag Bata
Pemasangan Bata Merah 1 SP : 4 PP 6.942
C.3 Pondasi Strauss Pile (Kedalaman 6 meter)
C.3.1 Pemasangan Pile Cap
Pekejraan Lantai Kerja 1 PC : 3 PS : 5 KRL 0.236
Pembuatan Beton Mutu K225 3.100
Pembesian 1 Kg dengan Besi Ulir 291.340
Pemasangan Bekisting Untuk Pile Cap 3.400
C.3.2 Pemasangan Strauss Pile (Kedalaman 6m)
Pembuatan Beton Mutu K225 12.1233
Pembesian 1 Kg dengan Besi Polos 1031.773
Total Anggaran Biaya
D. PEKERJAAN STRUKTUR
Pekerjaan Tie Beam
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 3.671
Pembesian 10 Kg dengan besi ulir 11.964
Pembesian 10 Kg dengan besi polos 58.878
Pemasangan 1 m2 Bekisting untuk tie beam 45.373
Pekerjaan Kolom
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 11.664
Pembesian 10 Kg dengan besi ulir 45.848
Pembesian 10 Kg dengan besi polos 222.754
Pemasangan 1 m2 Bekisting untuk kolom 266.173
Pekerjaan Balok
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 9.160
Pembesian 10 Kg dengan besi ulir 31.982
Pembesian 10 Kg dengan besi polos 125.860
Pemasangan 1 m2 Bekisting untuk balok 154.020
Pekerjaan Pelat Lantai
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 21.723
Pembesian 10 Kg dengan besi polos 157.196
Pemasangan 1 m2 Bekisting untuk pelat lantai 184.079
Pekerjaan Ring Balok
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 4.679
Pembesian 10 Kg dengan besi polos 90.031
Pemasangan 1 m2 Bekisting untuk ring balok 71.985
Pekerjaan Pelat Atap
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 5.347
Pembesian 10 Kg dengan besi polos 58.801
Pemasangan 1 m2 Bekisting untuk pelat atap 53.465
Pekerjaan Tangga
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 3.294
Pembesian 10 Kg dengan besi polos 37.549
Pemasangan 1 m2 Bekisting untuk tangga 20.947
Total Anggaran Biaya
E. PEKERJAAN DINDING
Pemasangan Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 4 PP 551.03
Pemasangan Plesteran 1 SP : 4 PP Tebal 15 mm 1102.06
Pemasangan Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 2 PP 115.474
Pemasangan Plesteran 1 SP : 2 PP Tebal 15 mm 47.9
Pemasangan Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C) 91.5244
Pemasangan Acian 1149.96
Total Anggaran Biaya
F. PEKERJAAN PINTU DAN JENDELA
Pembuatan dan Pemasangan Kusen Pintu dan Jendela Kayu Kelas II 0.393
Pembuatan dan Pemasangan Kusen Alumunium 167.938
Pembuatan dan Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Kelas II 19.57925
Pemasangan Daun Pintu Alumunium P3 1
Pemasangan Daun Pintu PJ2 1
Pemasangan Daun Jendela Alumunium 19
Pemasangan Pintu Besi 1.72
Pemangan Glass Block 2
Pemangan Kaca Polos Tebal 5 mm 25.56301
Pemasangan Engsel Pintu 48
Pemasangan Engsel Jendela 36
Pemasangan Kunci Tanam 29
Pemasangan Kunci Tanam Kamar Mandi 4
Pemasangan Pegangan Pintu 14
Pemasangan Kait Angin 18
Pemasangan Garasi Besi (Rolling Door) 12.036
Total Anggaran Biaya
G. PEKERJAAN LANTAI
Pekerjaan Urugan Pasir Tebal 5 cm 1.270
Pekerjaan Pembuatan Beton Tumbuk 1 PC : 3 PS : 5 KRL 1.651
Pekerjaan Urugan Tanah Peninggian Lantai 30.479
Pekerjaan Pemasangan Lantai Gracewood (Costal Dev Uk. 12 x 102 x 900 mm) 97.720
Pekerjaan Pemasangan Lantai Keramik 50 x 50 Roman Polos 123.970
Pekerjaan Pemasangan Lantai Keramik 33,3 x 33,3 Roman Polos 36.208
Pekerjaan Pemasangan Lantai Keramik 30 x 30 Roman Polos 30.355
Pekerjaan Pemasangan Lantai Keramik 20x20 Roman Polos 34.101
Pekerjaan Pemasangan Lantai Keramik 10 x 30 Roman Polos Untuk Border 4.004
Pekerjaan Pemasangan Plint Kayu Tebal 2 cm Lebar 10 cm 119.850
Pekerjaan Pemasangan Paving Block Berwarna Tebal 6 cm ( Ubin Set 21x21x6) 21.344
Pekerjaan Pemasangan Paving Block Berwarna Tebal 6cm (Uk. Bata 10,5x21x6) 4.057
Total Anggaran Biaya
H. PEKERJAAN ATAP
Pemasangan Konstruksi Kuda-Kuda Kayu Kelas II 1.625
Pemasangan Konstruksi Gording Kayu Kelas II 1.728
Pemasangan Rangka Atap Genting Kanmuri Kayu Kelas II 171.344
Pemasangan Listplank Ukuran (3x20) cm Kayu Kelas II 57.579
Pemasangan Penutup Atap Genting Kanmuri 171.344
Total Anggaran Biaya
I. PEKERJAAN PLAFOND
Pemasangan Langit-Langit Gypsum Board T.9mm 298.980
Pemasangan Langit - Langit Tripleks Tebal 6 mm 41.064
Pemasangan List Plafond Gypsum 154.703
Pemasangan Rangka Plafond Kayu Borneo 5/7 298.980
Pemasangan List Plafond Kayu Profil 46.094
Total Anggaran Biaya
J. PEKERJAAN ELEKTRIKAL
Pemasangan MCB (KWH Meter ) 1
Pemasangan Saklar Tunggal 11
Pemasangan Saklar Ganda 13
Pemasangan Saklar Hotel 2
Pemasangan Stop Kontak 27
Pemasangan Stop Kontak AC 7
Stop Kontak Waterproof 4
Pemasangan Stop Kontak Antena TV 4
Pemasangan Stop Kontak Telepon 3
Pemasangan Kotak Pembagi (Distributor Point) 2
Pemasangan Lampu Downlight Panasonic 4 Inch 26
Pemasangan Lampu LED TL Phillips 2
Pemasangan Lampu Taman 2
Total Anggaran Biaya
K. PEKERJAAN SANITASI
Pemasangan Closet Duduk 4
Pemasangan Closet Jongkok 1
Pemasangan Wastafel 4
Pemasangan Bathtube 2
Pemasangan Bak Mandi Teraso Volume 0,3 m3 1
Pemasangan Bak Cuci Piring Stainlessteel 1
Pemasangan Floor Drain 5
Pemasangan Jet Washer Closet 4
Pemasangan Tandon Air 1
Pemasangan Kran Air Diameter 1/2" atau 3/4" 5
Pemasangan Jet Shower 2
Pemasangan Pipa PVC Tipe AW Diameter 1" 35
Pemasangan Pipa PVC Tipe AW Diameter 1/2" 38
Pemasangan Pipa PVC Tipe AW Diameter 3/4" 60
Pemasangan Pipa PVC Tipe AW Diameter 1 1/4 " 25
Pemasangan Pipa PVC Tipe AW Diameter 2" 26
Pemasangan Pipa PVC Tipe AW Diameter 3" 49
Pemasangan Pipa PVC Tipe AW Diameter 4" 61
Pemasangan Bak Kontrol Pas. Bata 60 cm x 60 cm x 65 cm 4
Pemasangan Septictank 2x1.5x2 m 1
Total Anggaran Biaya
L. PEKERJAAN LAIN-LAIN
Pemasangan Railing Tangga Kayu 1.717
Pemasangan Grace Wood Untuk Bordes Tangga 3.300
Pemasangan Lantai Kayu Untuk Anak Tangga 3.600
Pemasangan 1 Balkon 14.258
Pemasangan Pipa Besi Diameter 2-3" 7.430
Pemasangan Batu Tempel Hitam 12.932
Pemasangan Bekisting untuk Dapur Bersih 2.913
Pengecoran Dapur Bersih 1.565
Pemasangan Plesteran 1 SP : 4 PP Tebal 15 mm untuk Dapur Bersih 2.913
Pemasangan Acian Dapur Bersih 2.913
Pemasangan Keramik Dapur Bersih 20 x 25 Roman Polos Golongan C 5.341
Total Anggaran Biaya
M. PEKERJAAN PENGECATAN
Pengecatan Bidang Kayu 77.20
Pengecatan Bidang Besi 41.77
Pengecatan Dinding Interior 534.91
Pengecatan Dinding Eksterior 615.05
Total Anggaran Biaya
TOTAL RENCANA ANGGARAN BIAYA
RENCANA ANGGARAN BIAYA SEMUA PEKERJAAN

Harga Satuan Jumlah Harga


Satuan
Upah Bahan Upah Bahan
4 5 6 7 = (3x5) 8 = (3x6)

m2 Rp 16,110.00 - Rp 6,766,200.00 -
m' Rp 67,860.00 Rp 287,291.25 Rp 1,900,080.00 Rp 8,044,155.00
m2 Rp 561,650.00 Rp 911,785.50 Rp 6,880,212.50 Rp 11,169,372.38
m2 Rp 344,750.00 Rp 652,567.50 Rp 4,137,000.00 Rp 7,830,810.00
m2 Rp 9,560.00 Rp 697,000.00 Rp 6,883.20 Rp 501,840.00
m' Rp 22,345.00 Rp 49,100.00 Rp 3,882,220.30 Rp 8,530,634.00
Rp 1,022,275.00 Rp 2,597,744.25 Rp 23,572,596.00 Rp 36,076,811.38

m3 Rp 74,975.00 - Rp 11,220,413.43 -
m3 Rp 54,350.00 - Rp 2,583,301.65 -
Rp 129,325.00 Rp - Rp 13,803,715.08 Rp -

m3 Rp 244,200.00 Rp 606,540.00 Rp 15,804,624.00 Rp 39,255,268.80


m3 Rp 202,030.50 Rp 688,005.83 Rp 3,683,824.14 Rp 12,545,098.30
Kg Rp 1,570.70 Rp 10,350.00 Rp 519,510.41 Rp 3,423,271.61
m2 Rp 84,656.00 Rp 126,150.00 Rp 1,422,220.80 Rp 2,119,320.00

m2 Rp 85,550.00 Rp 147,410.00 Rp 593,888.10 Rp 1,023,320.22

m3 Rp 253,160.00 Rp 528,629.60 Rp 59,856.52 Rp 124,987.86


m3 Rp 202,030.50 Rp 688,005.83 Rp 626,294.55 Rp 2,132,818.07
Kg Rp 1,570.70 Rp 12,371.25 Rp 457,608.37 Rp 3,604,244.92
m2 Rp 84,656.00 Rp 126,150.00 Rp 287,830.40 Rp 428,910.00

m3 Rp 202,030.50 Rp 688,005.83 Rp 2,449,276.36 Rp 8,340,901.08


Kg Rp 1,570.70 Rp 10,350.00 Rp 1,620,605.93 Rp 10,678,851.07
Rp 1,363,025.60 Rp 3,631,968.34 Rp 27,525,539.57 Rp 83,676,991.94

m3 Rp 202,030.50 Rp 680,295.00 Rp 741,739.83 Rp 2,497,652.07


Kg Rp 15,707.00 Rp 123,712.50 Rp 187,914.53 Rp 1,480,064.68
Kg Rp 15,707.00 Rp 103,500.00 Rp 924,792.07 Rp 6,093,842.21
m2 Rp 84,656.00 Rp 87,825.00 Rp 3,841,096.69 Rp 3,984,883.73
m3 Rp 202,030.50 Rp 680,295.00 Rp 2,356,471.23 Rp 7,934,918.70
Kg Rp 15,707.00 Rp 123,712.50 Rp 720,140.82 Rp 5,672,020.19
Kg Rp 15,707.00 Rp 103,500.00 Rp 3,498,790.80 Rp 23,054,997.62
m2 Rp 107,448.00 Rp 193,175.00 Rp 28,599,788.74 Rp 51,418,027.23

m3 Rp 202,030.50 Rp 680,295.00 Rp 1,850,545.24 Rp 6,231,319.88


Kg Rp 15,707.00 Rp 123,712.50 Rp 502,339.26 Rp 3,956,557.34
Kg Rp 15,707.00 Rp 103,500.00 Rp 1,976,890.63 Rp 13,026,560.14
m2 Rp 107,448.00 Rp 193,175.00 Rp 16,549,115.17 Rp 29,752,767.14

m3 Rp 202,030.50 Rp 680,295.00 Rp 4,388,739.62 Rp 14,778,152.89


Kg Rp 15,707.00 Rp 103,500.00 Rp 2,469,070.09 Rp 16,269,736.67
m2 Rp 107,448.00 Rp 296,325.00 Rp 19,778,866.67 Rp 54,547,061.51

m3 Rp 202,030.50 Rp 680,295.00 Rp 945,305.76 Rp 3,183,117.31


Kg Rp 15,707.00 Rp 103,500.00 Rp 1,414,122.56 Rp 9,318,245.67
m2 Rp 84,656.00 Rp 81,900.00 Rp 6,093,962.16 Rp 5,895,571.50

m3 Rp 202,030.50 Rp 680,295.00 Rp 1,080,156.07 Rp 3,637,197.22


Kg Rp 15,707.00 Rp 103,500.00 Rp 923,589.95 Rp 6,085,920.90
m2 Rp 84,656.00 Rp 196,325.00 Rp 4,526,133.04 Rp 10,496,516.13

m3 Rp 202,030.50 Rp 680,295.00 Rp 665,393.51 Rp 2,240,571.99


Kg Rp 15,707.00 Rp 103,500.00 Rp 589,778.04 Rp 3,886,294.48
m2 Rp 84,656.00 Rp 177,350.00 Rp 1,773,323.09 Rp 3,715,021.39
Rp 2,232,251.50 Rp 7,083,777.50 Rp 106,398,065.55 Rp 289,157,018.57

m2 Rp 85,550.00 Rp 148,083.50 Rp 47,140,616.50 Rp 81,598,451.01


m2 Rp 48,840.00 Rp 12,252.00 Rp 53,824,610.40 Rp 13,502,439.12
m2 Rp 85,550.00 Rp 163,810.00 Rp 9,878,800.70 Rp 18,915,795.94
m2 Rp 48,840.00 Rp 15,736.40 Rp 2,339,436.00 Rp 753,773.56
m2 Rp 146,520.00 Rp 136,871.00 Rp 13,410,155.09 Rp 12,527,036.15
m2 Rp 32,560.00 Rp 3,575.00 Rp 37,442,697.60 Rp 4,111,107.00
Rp 447,860.00 Rp 480,327.90 Rp 164,036,316.29 Rp 131,408,602.78

m3 Rp 2,796,300.00 Rp 10,233,750.00 Rp 1,098,945.90 Rp 4,021,863.75


m Rp 9,601.80 Rp 131,316.66 Rp 1,612,507.09 Rp 22,053,057.25
m2 Rp 396,208.00 Rp 370,950.00 Rp 7,757,454.69 Rp 7,262,922.05
Buah Rp 98,318.00 Rp 1,580,000.00 Rp 98,318.00 Rp 1,580,000.00
Buah Rp 98,318.00 Rp 4,335,000.00 Rp 98,318.00 Rp 4,335,000.00
Buah Rp 98,318.00 Rp 766,500.00 Rp 1,868,042.00 Rp 14,563,500.00
m2 Rp 145,177.00 Rp 963,000.00 Rp 249,704.44 Rp 1,656,360.00
Buah Rp 19,733.80 Rp 20,000.00 Rp 39,467.60 Rp 40,000.00
m2 Rp 19,733.80 Rp 129,510.00 Rp 504,455.35 Rp 3,310,665.55
Buah Rp 19,733.80 Rp 41,500.00 Rp 947,222.40 Rp 1,992,000.00
Buah Rp 19,733.80 Rp 35,000.00 Rp 710,416.80 Rp 1,260,000.00
Buah Rp 62,261.00 Rp 210,000.00 Rp 1,805,569.00 Rp 6,090,000.00
Buah Rp 56,055.50 Rp 33,000.00 Rp 224,222.00 Rp 132,000.00
Buah Rp 65,823.00 Rp 200,000.00 Rp 921,522.00 Rp 2,800,000.00
Buah Rp 20,677.00 Rp 25,000.00 Rp 372,186.00 Rp 450,000.00
m2 Rp 261,066.00 Rp 1,760,000.00 Rp 3,142,190.38 Rp 21,183,360.00
Rp 4,187,058.50 Rp 20,834,526.66 Rp 21,450,541.64 Rp 92,730,728.60

m3 Rp 15,650.00 Rp 269,400.00 Rp 19,876.75 Rp 342,159.55


m3 Rp 198,545.00 Rp 498,647.00 Rp 327,818.44 Rp 823,318.06
m3 Rp 27,175.00 Rp 60,000.00 Rp 828,256.91 Rp 1,828,718.10
m2 Rp 113,960.00 Rp 350,250.00 Rp 11,136,171.20 Rp 34,226,430.00
m2 Rp 113,960.00 Rp 155,527.50 Rp 14,127,655.39 Rp 19,280,790.83
m2 Rp 113,960.00 Rp 128,461.50 Rp 4,126,275.08 Rp 4,651,346.84
m2 Rp 113,960.00 Rp 119,952.50 Rp 3,459,278.59 Rp 3,641,182.13
m2 Rp 113,960.00 Rp 120,392.50 Rp 3,886,149.96 Rp 4,105,504.64
m2 Rp 171,065.50 Rp 449,432.50 Rp 684,980.48 Rp 1,799,617.62
m' Rp 26,814.00 Rp 17,300.00 Rp 3,213,657.90 Rp 2,073,405.00
m2 Rp 84,720.30 Rp 123,600.00 Rp 1,808,303.97 Rp 2,638,167.84
m2 Rp 84,720.30 Rp 93,300.00 Rp 343,727.20 Rp 378,536.76
Rp 1,178,490.10 Rp 2,386,263.50 Rp 43,962,151.87 Rp 75,789,177.37

m3 Rp 1,864,200.00 Rp 5,789,000.00 Rp 3,028,824.53 Rp 9,405,570.87


m3 Rp 3,122,535.00 Rp 5,750,000.00 Rp 5,396,340.01 Rp 9,937,104.00
m2 Rp 22,345.00 Rp 224,000.00 Rp 3,828,679.69 Rp 38,381,036.06
m' Rp 34,475.00 Rp 61,000.00 Rp 1,985,036.03 Rp 3,512,319.00
m2 Rp 32,560.00 Rp 123,680.00 Rp 5,578,957.74 Rp 21,191,814.91
Rp 5,076,115.00 Rp 11,947,680.00 Rp 19,817,838.00 Rp 82,427,844.85

m2 Rp 16,280.00 Rp 28,060.00 Rp 4,867,391.06 Rp 8,389,373.05


m2 Rp 22,345.00 Rp 32,475.00 Rp 917,572.73 Rp 1,333,549.99
m' Rp 11,238.00 Rp 23,850.00 Rp 1,738,552.31 Rp 3,689,666.55
m2 Rp 52,040.00 Rp 76,350.00 Rp 15,558,908.53 Rp 22,827,107.35
m' Rp 6,638.00 Rp 14,860.00 Rp 305,971.97 Rp 684,956.84
Rp 108,541.00 Rp 175,595.00 Rp 23,388,396.61 Rp 36,924,653.78

Buah Rp 36,390.00 Rp 247,650.00 Rp 36,390.00 Rp 247,650.00


Buah Rp 36,390.00 Rp 198,750.00 Rp 400,290.00 Rp 2,186,250.00
Buah Rp 36,390.00 Rp 201,250.00 Rp 473,070.00 Rp 2,616,250.00
Buah Rp 36,390.00 Rp 209,650.00 Rp 72,780.00 Rp 419,300.00
Buah Rp 36,390.00 Rp 198,750.00 Rp 982,530.00 Rp 5,366,250.00
Buah Rp 36,390.00 Rp 218,550.00 Rp 254,730.00 Rp 1,529,850.00
Buah Rp 36,390.00 Rp 225,750.00 Rp 145,560.00 Rp 903,000.00
Buah Rp 36,390.00 Rp 221,750.00 Rp 145,560.00 Rp 887,000.00
Buah Rp 36,390.00 Rp 218,750.00 Rp 109,170.00 Rp 656,250.00
Buah Rp 36,390.00 Rp 253,250.00 Rp 72,780.00 Rp 506,500.00
Buah Rp 36,390.00 Rp 258,450.00 Rp 946,140.00 Rp 6,719,700.00
Buah Rp 36,390.00 Rp 284,950.00 Rp 72,780.00 Rp 569,900.00
Buah Rp 36,390.00 Rp 214,025.00 Rp 72,780.00 Rp 428,050.00
Rp 473,070.00 Rp 2,951,525.00 Rp 3,784,560.00 Rp 23,035,950.00

Buah Rp 457,870.00 Rp 2,210,100.00 Rp 1,831,480.00 Rp 8,840,400.00


Buah Rp 298,510.00 Rp 160,095.00 Rp 298,510.00 Rp 160,095.00
Buah Rp 299,065.00 Rp 3,443,485.00 Rp 1,196,260.00 Rp 13,773,940.00
Buah Rp 98,538.00 Rp 3,000,000.00 Rp 197,076.00 Rp 6,000,000.00
Buah Rp 902,550.00 Rp 560,000.00 Rp 902,550.00 Rp 560,000.00
Buah Rp 41,223.00 Rp 295,400.00 Rp 41,223.00 Rp 295,400.00
Buah Rp 13,741.00 Rp 280,000.00 Rp 68,705.00 Rp 1,400,000.00
Buah Rp 13,741.00 Rp 94,000.00 Rp 54,964.00 Rp 376,000.00
Buah Rp 1,004,550.00 Rp 1,344,000.00 Rp 1,004,550.00 Rp 1,344,000.00
Buah Rp 13,741.00 Rp 177,500.00 Rp 68,705.00 Rp 887,500.00
Buah Rp 186,605.10 Rp 174,000.00 Rp 373,210.20 Rp 348,000.00
m Rp 10,981.60 Rp 21,893.75 Rp 383,115.08 Rp 763,807.26
m Rp 10,981.60 Rp 12,593.75 Rp 420,287.80 Rp 481,988.00
m Rp 10,981.60 Rp 15,500.00 Rp 653,811.52 Rp 922,823.50
m Rp 16,472.40 Rp 25,187.50 Rp 417,789.48 Rp 638,830.56
m Rp 16,472.40 Rp 59,675.00 Rp 431,692.19 Rp 1,563,902.73
m Rp 24,643.10 Rp 91,062.50 Rp 1,202,706.50 Rp 4,444,305.31
m Rp 24,643.10 Rp 147,250.00 Rp 1,506,876.28 Rp 9,004,043.00
Buah Rp 435,031.00 Rp 349,258.00 Rp 1,740,124.00 Rp 1,397,032.00
Buah Rp 295,273.00 Rp 4,102,420.90 Rp 295,273.00 Rp 4,102,420.90
Rp 4,175,613.90 Rp 16,563,421.40 Rp 13,088,909.04 Rp 57,304,488.26

m3 Rp 55,928.00 Rp 87,500.00 Rp 96,039.56 Rp 150,255.000


m2 Rp 113,960.00 Rp 350,250.00 Rp 376,068.00 Rp 1,155,825.000
m2 Rp 26,814.00 Rp 17,300.00 Rp 96,530.40 Rp 62,280.000
m2 Rp 55,928.00 Rp 149,784.00 Rp 797,438.20 Rp 2,135,665.207
m' Rp 19,616.40 Rp 84,900.00 Rp 145,749.85 Rp 630,807.000
m2 Rp 113,960.00 Rp 30,682.50 Rp 1,473,730.72 Rp 396,786.090
m2 Rp 84,656.00 Rp 126,150.00 Rp 246,602.93 Rp 367,474.950
m3 Rp 202,030.50 Rp 718,750.20 Rp 316,088.84 Rp 1,124,527.813
m2 Rp 48,840.00 Rp 12,252.00 Rp 142,270.92 Rp 35,690.076
m2 Rp 32,560.00 Rp 3,575.00 Rp 94,847.28 Rp 10,413.975
m2 Rp 146,520.00 Rp 136,871.00 Rp 782,490.06 Rp 730,959.576
Rp 900,812.90 Rp 1,718,014.70 Rp 4,567,856.76 Rp 6,800,684.69

m2 Rp 8,788.70 Rp 31,216.70 Rp 678,480.61 Rp 2,409,904.27


m2 Rp 14,127.00 Rp 20,750.00 Rp 590,089.03 Rp 866,733.73
m2 Rp 9,946.90 Rp 9,880.00 Rp 5,320,666.44 Rp 5,284,881.16
m2 Rp 9,946.90 Rp 14,846.00 Rp 6,117,870.69 Rp 9,131,076.84
Rp 42,809.50 Rp 76,692.70 Rp 12,707,106.76 Rp 17,692,595.99
YA Rp 478,103,593.17 Rp 933,025,548.18
Total Harga
Upah + Bahan
9 = (7+8)

Rp 6,766,200.00
Rp 9,944,235.00
Rp 18,049,584.88
Rp 11,967,810.00
Rp 508,723.20
Rp 12,412,854.30
Rp 59,649,407.38

Rp 11,220,413.43
Rp 2,583,301.65
Rp 13,803,715.08

Rp 55,059,892.80
Rp 16,228,922.44
Rp 3,942,782.02
Rp 3,541,540.80

Rp 1,617,208.32

Rp 184,844.38
Rp 2,759,112.62
Rp 4,061,853.29
Rp 716,740.40

Rp 10,790,177.44
Rp 12,299,457.00
Rp 111,202,531.50

Rp 3,239,391.90
Rp 1,667,979.21
Rp 7,018,634.29
Rp 7,825,980.41
Rp 10,291,389.93
Rp 6,392,161.00
Rp 26,553,788.41
Rp 80,017,815.97

Rp 8,081,865.12
Rp 4,458,896.60
Rp 15,003,450.77
Rp 46,301,882.31

Rp 19,166,892.50
Rp 18,738,806.76
Rp 74,325,928.18

Rp 4,128,423.07
Rp 10,732,368.23
Rp 11,989,533.66

Rp 4,717,353.29
Rp 7,009,510.84
Rp 15,022,649.17

Rp 2,905,965.50
Rp 4,476,072.52
Rp 5,488,344.48
Rp 395,555,084.13

Rp 128,739,067.51
Rp 67,327,049.52
Rp 28,794,596.64
Rp 3,093,209.56
Rp 25,937,191.24
Rp 41,553,804.60
Rp 295,444,919.07

Rp 5,120,809.65
Rp 23,665,564.34
Rp 15,020,376.74
Rp 1,678,318.00
Rp 4,433,318.00
Rp 16,431,542.00
Rp 1,906,064.44
Rp 79,467.60
Rp 3,815,120.90
Rp 2,939,222.40
Rp 1,970,416.80
Rp 7,895,569.00
Rp 356,222.00
Rp 3,721,522.00
Rp 822,186.00
Rp 24,325,550.38
Rp 114,181,270.24

Rp 362,036.30
Rp 1,151,136.50
Rp 2,656,975.01
Rp 45,362,601.20
Rp 33,408,446.22
Rp 8,777,621.91
Rp 7,100,460.72
Rp 7,991,654.60
Rp 2,484,598.09
Rp 5,287,062.90
Rp 4,446,471.81
Rp 722,263.96
Rp 119,751,329.23

Rp 12,434,395.40
Rp 15,333,444.01
Rp 42,209,715.76
Rp 5,497,355.03
Rp 26,770,772.65
Rp 102,245,682.84

Rp 13,256,764.11
Rp 2,251,122.72
Rp 5,428,218.86
Rp 38,386,015.88
Rp 990,928.81
Rp 60,313,050.39

Rp 284,040.00
Rp 2,586,540.00
Rp 3,089,320.00
Rp 492,080.00
Rp 6,348,780.00
Rp 1,784,580.00
Rp 1,048,560.00
Rp 1,032,560.00
Rp 765,420.00
Rp 579,280.00
Rp 7,665,840.00
Rp 642,680.00
Rp 500,830.00
Rp 26,820,510.00

Rp 10,671,880.00
Rp 458,605.00
Rp 14,970,200.00
Rp 6,197,076.00
Rp 1,462,550.00
Rp 336,623.00
Rp 1,468,705.00
Rp 430,964.00
Rp 2,348,550.00
Rp 956,205.00
Rp 721,210.20
Rp 1,146,922.34
Rp 902,275.80
Rp 1,576,635.02
Rp 1,056,620.04
Rp 1,995,594.91
Rp 5,647,011.81
Rp 10,510,919.28
Rp 3,137,156.00
Rp 4,397,693.90
Rp 70,393,397.29

Rp 246,294.56
Rp 1,531,893.00
Rp 158,810.40
Rp 2,933,103.41
Rp 776,556.85
Rp 1,870,516.81
Rp 614,077.88
Rp 1,440,616.65
Rp 177,961.00
Rp 105,261.26
Rp 1,513,449.64
Rp 11,368,541.45

Rp 3,088,384.88
Rp 1,456,822.75
Rp 10,605,547.60
Rp 15,248,947.52
Rp 30,399,702.75
Rp 1,411,129,141.35
Jumlah Harga
No Jenis Pekerjaan
Upah Bahan
1 Pekerjaan Persiapan Rp 23,572,596.00 Rp 36,076,811.38
2 Pekerjaan Tanah Rp 13,803,715.08 -
3 Pekerjaan Pondasi Rp 27,525,539.57 Rp 83,676,991.94
4 Pekerjaan Struktur Rp 106,398,065.55 Rp 289,157,018.57
5 Pekerjaan Dinding Rp 164,036,316.29 Rp 131,408,602.78
6 Pekerjaan Pintu dan Jendela Rp 21,450,541.64 Rp 92,730,728.60
7 Pekerjaan Lantai Rp 43,962,151.87 Rp 75,789,177.37
8 Pekerjaan Atap Rp 19,817,838.00 Rp 82,427,844.85
9 Pekerjaan Plafond Rp 23,388,396.61 Rp 36,924,653.78
10 Pekerjaan Elektrikal Rp 3,784,560.00 Rp 23,035,950.00
11 Pekerjaan Sanitasi Rp 13,088,909.04 Rp 57,304,488.26
12 Pekerjaan Lain-Lain Rp 4,567,856.76 Rp 6,800,684.69
13 Pekerjaan Pengecatan Rp 12,707,106.76 Rp 17,692,595.99
JUMLAH Rp 478,103,593.17 Rp 933,025,548.18
mlah Harga Persentase
Alat Bahan + Upah + Alat Upah Bahan Alat Upah+Bahan+Alat
- Rp 59,649,407.38 39.52% 60.48% - 100.00%
- Rp 13,803,715.08 100.00% - - 100.00%
- Rp 111,202,531.50 24.75% 75.25% - 100.00%
- Rp 395,555,084.13 26.90% 73.10% - 100.00%
- Rp 295,444,919.07 55.52% 44.48% - 100.00%
- Rp 114,181,270.24 18.79% 81.21% - 100.00%
- Rp 119,751,329.23 36.71% 63.29% - 100.00%
- Rp 102,245,682.84 19.38% 80.62% - 100.00%
- Rp 60,313,050.39 38.78% 61.22% - 100.00%
- Rp 26,820,510.00 14.11% 85.89% - 100.00%
- Rp 70,393,397.29 18.59% 81.41% - 100.00%
- Rp 11,368,541.45 40.18% 59.82% - 100.00%
- Rp 30,399,702.75 41.80% 58.20% - 100.00%
- Rp 1,411,129,141.35 33.88% 66.12% - 100.00%
No Jenis Pekerjaan
1 Pekerjaan Persiapan
2 Pekerjaan Tanah
3 Pekerjaan Pondasi
4 Pekerjaan Struktur
5 Pekerjaan Dinding
6 Pekerjaan Pintu dan Jendela
7 Pekerjaan Lantai
8 Pekerjaan Atap
9 Pekerjaan Plafond
10 Pekerjaan Elektrikal
11 Pekerjaan Sanitasi
12 Pekerjaan Lain-Lain
13 Pekerjaan Pengecatan
Harga Total
Keuntungan 10%
Harga Total + Keuntungan 10%
PPN 10%
Harga Penawaran
Harga Bid Price (Pembulatan)
Terbilang Satu Milyar Tujuh Ratus Tujuh Juta Empar Ratus Tujuh Pu
Biaya Pekerjaan
Rp 59,649,407.38
Rp 13,803,715.08
Rp 111,202,531.50 Harga Per m2
Rp 395,555,084.13 Luas Lantai 1 = 200.173
Rp 295,444,919.07 Luas Lantai 2 = 159.12
Rp 114,181,270.24 Luas Total = 359.293
Rp 119,751,329.23 Harga Per m2 = Rp 4,752,305.22
Rp 102,245,682.84
Rp 60,313,050.39
Rp 26,820,510.00
Rp 70,393,397.29
Rp 11,368,541.45
Rp 30,399,702.75
Rp 1,411,129,141.35
Rp 141,112,914.13
Rp 1,552,242,055.48
Rp 155,224,205.55
Rp 1,707,466,261.03
Rp 1,707,470,000.00
tus Tujuh Juta Empar Ratus Tujuh Puluh Ribu Rupiah
m2
m2
m2
m2
Rp 4,752,305.22
TABEL REKAPITULASI VOLUME

No
1
A. PEKERJAAN PERSIAPAN
A.1
A.2
A.3
A.4
A.5
A.6
B. PEKERJAAN TANAH
B.1
B.2
C. PEKERJAAN PONDASI
C.1 Pondasi Batu Kali
C.1.1
C.1.2
C.1.3
C.1.4
C.2 Pondasi Rollag Bata
C.2.1
C.3 Pondasi Strauss Pile (Kedalaman 6 meter)
C.3.1 Pemasangan Pile Cap
C.3.1.1
C.3.1.2
C.3.1.3
C.3.1.4
C.3.2 Pemasangan Strauss Pile (Kedalaman 6m)
C.3.2.1
C.3.2.2
D. PEKERJAAN STRUKTUR
D.1 Pekerjaan Tie Beam
D.1.1
D.1.2
D.1.3
D.1.4
D.2 Pekerjaan Kolom
D.2.1
D.2.2
D.2.3
D.2.4
D.3 Pekerjaan Balok
D.3.1
D.3.2
D.3.3
D.3.4
D.4 Pekerjaan Pelat Lantai
D.4.1
D.4.2
D.3.4
D.5 Pekerjaan Ring Balok
D.5.1
D.5.2
D.5.3
D.6 Pekerjaan Pelat Atap
D.6.1
D.6.2
D.6.3
D.7 Pekerjaan Tangga
D.7.1
D.7.2
D.7.3
E. PEKERJAAN DINDING
E.1
E.2
E.3
E.4
E.5
E.6
F. PEKERJAAN PINTU DAN JENDELA
F.1
F.2
F.3
F.4
F.5
F.6
F.7
F.8
F.9
F.10
F.11
F.12
F.13
F.14
F.15
F.16
G. PEKERJAAN LANTAI
G.1
G.2
G.3
G.4
G.5
G.6
G.7
G.8
G.9
G.10
G.11
G.12
H. PEKERJAAN ATAP
H.1
H.2
H.3
H.4
H.5
I. PEKERJAAN PLAFOND
I.1
I.2
I.3
1.4
1.5
J. PEKERJAAN ELEKTRIKAL
J.1
J.2
J.3
J.4
J.5
J.6
J.7
J.8
J.9
J.10
J.11
J.12
J.13
K. PEKERJAAN SANITASI
K.1
K.2
K.3
K.4
K.5
K.6
K.7
K.8
K.9
K.10
K.11
K.12
K.13
K.14
K.15
K.16
K.17
K.18
K.19
K.20
L. PEKERJAAN LAIN-LAIN
L.1
L.2
L.3
L.4
L.5
L.6
L.7
L.8
L.9
L.10
L.11
M. PEKERJAAN PENGECATAN
M.1
M.2
M.3
M.4
TABEL REKAPITULASI VOLUME

Urutan Pekerjaan Volume


2 3
A. PEKERJAAN PERSIAPAN
Pembersihan Lapangan 420
Pembuatan Pagar Sementara 28
Pembuatan Direksi Keet 12.25
Pembuatan Los Kerja 12
Pembuatan Papan Nama Proyek 0.72
Pemasangan Bouwplank 173.74
B. PEKERJAAN TANAH
Penggalian Tanah Biasa Sedalam 1 m 149.66
Pengurugan dengan Tanah Urug 47.53
C. PEKERJAAN PONDASI
C.1 Pondasi Batu Kali
Pemasangan Pondasi Batu Belah 1 SP : 4 PP 64.72
Pembuatan Beton Mutu K225 18.234
Pembesian 1 Kg dengan Besi Polos 330.7509
Pemasangan Bekisting 16.8
C.2 Pondasi Rollag Bata
Pemasangan Bata Merah 1 SP : 4 PP 6.942
C.3 Pondasi Strauss Pile (Kedalaman 6 meter)
C.3.1 Pemasangan Pile Cap
Pekejraan Lantai Kerja 1 PC : 3 PS : 5 KRL 0.236
Pembuatan Beton Mutu K225 3.100
Pembesian 1 Kg dengan Besi Ulir 291.340
Pemasangan Bekisting Untuk Pile Cap 3.400
C.3.2 Pemasangan Strauss Pile (Kedalaman 6m)
Pembuatan Beton Mutu K225 12.123
Pembesian 1 Kg dengan Besi Polos 1031.773
D. PEKERJAAN STRUKTUR
D.1 Pekerjaan Tie Beam
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 3.6714
Pembesian 10 Kg dengan besi ulir 11.9637
Pembesian 10 Kg dengan besi polos 58.8777
Pemasangan 1 m2 Bekisting untuk tie beam 45.3730
D.2 Pekerjaan Kolom
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 11.664
Pembesian 10 Kg dengan besi ulir 45.848
Pembesian 10 Kg dengan besi polos 222.754
Pemasangan 1 m2 Bekisting untuk kolom 266.173
D.3 Pekerjaan Balok
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 9.160
Pembesian 10 Kg dengan besi ulir 31.982
Pembesian 10 Kg dengan besi polos 125.860
Pemasangan 1 m2 Bekisting untuk balok 154.020
D.4 Pekerjaan Pelat Lantai
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 21.723
Pembesian 10 Kg dengan besi polos 157.196
Pemasangan 1 m2 Bekisting untuk pelat lantai 184.079
D.5 Pekerjaan Ring Balok
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 4.679
Pembesian 10 Kg dengan besi polos 90.031
Pemasangan 1 m2 Bekisting untuk ring balok 71.985
D.6 Pekerjaan Pelat Atap
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 5.347
Pembesian 10 Kg dengan besi polos 58.801
Pemasangan 1 m2 Bekisting untuk pelat atap 53.465
D.7 Pekerjaan Tangga
Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa 3.294
Pembesian 10 Kg dengan besi polos 37.549
Pemasangan 1 m2 Bekisting untuk tangga 20.947
E. PEKERJAAN DINDING
Pemasangan Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 4 PP 551.03
Pemasangan Plesteran 1 SP : 4 PP Tebal 15 mm 1102.06
Pemasangan Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 2 PP 115.474
Pemasangan Plesteran 1 SP : 2 PP Tebal 15 mm 47.9
Pemasangan Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C) 91.5244
Pemasangan Acian 1149.96
F. PEKERJAAN PINTU DAN JENDELA
Pembuatan dan Pemasangan Kusen Pintu dan Jendela Kayu Kelas II 0.393
Pembuatan dan Pemasangan Kusen Alumunium 167.938
Pembuatan dan Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Kelas II 19.57925
Pemasangan Daun Pintu Alumunium P3 1
Pemasangan Daun Pintu PJ2 1
Pemasangan Daun Jendela Alumunium 19
Pemasangan Pintu Besi 1.72
Pemangan Glass Block 2
Pemangan Kaca Polos Tebal 5 mm 25.56301
Pemasangan Engsel Pintu 48
Pemasangan Engsel Jendela 36
Pemasangan Kunci Tanam 29
Pemasangan Kunci Tanam Kamar Mandi 4
Pemasangan Pegangan Pintu 14
Pemasangan Kait Angin 18
Pemasangan Garasi Besi (Rolling Door) 12.036
G. PEKERJAAN LANTAI
Pekerjaan Urugan Pasir Tebal 5 cm 1.270
Pekerjaan Pembuatan Beton Tumbuk 1 PC : 3 PS : 5 KRL 1.651
Pekerjaan Urugan Tanah Peninggian Lantai 30.479
Pekerjaan Pemasangan Lantai Gracewood (Costal Dev Uk. 12 x 102 x 900 mm) 97.720
Pekerjaan Pemasangan Lantai Keramik 50 x 50 Roman Polos 123.970
Pekerjaan Pemasangan Lantai Keramik 33,3 x 33,3 Roman Polos 36.208
Pekerjaan Pemasangan Lantai Keramik 30 x 30 Roman Polos 30.355
Pekerjaan Pemasangan Lantai Keramik 20x20 Roman Polos 34.101
Pekerjaan Pemasangan Lantai Keramik 10 x 30 Roman Polos Untuk Border 4.004
Pekerjaan Pemasangan Plint Kayu Tebal 2 cm Lebar 10 cm 119.850
Pekerjaan Pemasangan Paving Block Berwarna Tebal 6 cm ( Ubin Set 21x21x6) 21.344
Pekerjaan Pemasangan Paving Block Berwarna Tebal 6cm (Uk. Bata 10,5x21x6) 4.057
H. PEKERJAAN ATAP
Pemasangan Konstruksi Kuda-Kuda Kayu Kelas II 1.625
Pemasangan Konstruksi Gording Kayu Kelas II 1.728
Pemasangan Rangka Atap Genting Kanmuri Kayu Kelas II 171.344
Pemasangan Listplank Ukuran (3x20) cm Kayu Kelas II 57.579
Pemasangan Penutup Atap Genting Kanmuri 171.344
I. PEKERJAAN PLAFOND
Pemasangan Langit-Langit Gypsum Board T.9mm 298.980
Pemasangan Langit - Langit Tripleks Tebal 6 mm 41.064
Pemasangan List Plafond Gypsum 154.703
Pemasangan Rangka Plafond Kayu Borneo 5/7 298.980
Pemasangan List Plafond Kayu Profil 46.094
J. PEKERJAAN ELEKTRIKAL
Pemasangan MCB (KWH Meter ) 1
Pemasangan Saklar Tunggal 11
Pemasangan Saklar Ganda 13
Pemasangan Saklar Hotel 2
Pemasangan Stop Kontak 27
Pemasangan Stop Kontak AC 7
Stop Kontak Waterproof 4
Pemasangan Stop Kontak Antena TV 4
Pemasangan Stop Kontak Telepon 3
Pemasangan Kotak Pembagi (Distributor Point) 2
Pemasangan Lampu Downlight Panasonic 4 Inch 26
Pemasangan Lampu LED TL Phillips 2
Pemasangan Lampu Taman 2
K. PEKERJAAN SANITASI
Pemasangan Closet Duduk 4
Pemasangan Closet Jongkok 1
Pemasangan Wastafel 4
Pemasangan Bathtube 2
Pemasangan Bak Mandi Teraso Volume 0,3 m3 1
Pemasangan Bak Cuci Piring Stainlessteel 1
Pemasangan Floor Drain 5
Pemasangan Jet Washer Closet 4
Pemasangan Tandon Air 1
Pemasangan Kran Air Diameter 1/2" atau 3/4" 5
Pemasangan Jet Shower 2
Pemasangan Pipa PVC Tipe AW Diameter 1" 35
Pemasangan Pipa PVC Tipe AW Diameter 1/2" 38
Pemasangan Pipa PVC Tipe AW Diameter 3/4" 60
Pemasangan Pipa PVC Tipe AW Diameter 1 1/4 " 25
Pemasangan Pipa PVC Tipe AW Diameter 2" 26
Pemasangan Pipa PVC Tipe AW Diameter 3" 49
Pemasangan Pipa PVC Tipe AW Diameter 4" 61
Pemasangan Bak Kontrol Pas. Bata 60 cm x 60 cm x 65 cm 4
Pemasangan Septictank 2x1.5x2 m 1
L. PEKERJAAN LAIN-LAIN
Pemasangan Railing Tangga Kayu 1.717
Pemasangan Grace Wood Untuk Bordes Tangga 3.300
Pemasangan Lantai Kayu Untuk Anak Tangga 3.600
Pemasangan 1 Balkon 14.258
Pemasangan Pipa Besi Diameter 2-3" 7.430
Pemasangan Batu Tempel Hitam 12.932
Pemasangan Bekisting untuk Dapur Bersih 2.913
Pengecoran Dapur Bersih 1.565
Pemasangan Plesteran 1 SP : 4 PP Tebal 15 mm untuk Dapur Bersih 2.913
Pemasangan Acian Dapur Bersih 2.913
Pemasangan Keramik Dapur Bersih 20 x 25 Roman Polos Golongan C 5.341
M. PEKERJAAN PENGECATAN
Pengecatan Bidang Kayu 77.20
Pengecatan Bidang Besi 41.77
Pengecatan Dinding Interior 534.91
Pengecatan Dinding Eksterior 615.05
Satuan
4

m2
m'
m2
m2
m2
m'

m3
m3

m3
m3
Kg
m2

m2

m3
m3
Kg
m2

m3
Kg

m3
Kg
Kg
m2

m3
Kg
Kg
m2

m3
Kg
Kg
m2

m3
Kg
m2

m3
Kg
m2

m3
Kg
m2

m3
Kg
m2

m2
m2
m2
m2
m2
m2

m3
m
m2
Buah
Buah
Buah
m2
Buah
m2
Buah
Buah
Buah
Buah
Buah
Buah
m2

m3
m3
m3
m2
m2
m2
m2
m2
m2
m'
m2
m2

m3
m3
m2
m'
m2

m2
m2
m'
m2
m'

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
m
m
m
m
m
m
m
Buah
Buah

m3
m2
m2
m2
m'
m2
m2
m3
m2
m2
m2

m2
m2
m2
m2
Pekerjaan Struktur
Pondasi = Batu Kali, Rollag Bata, Strauss Pile
Mutu Beton = Mutu Beton K-225 / f'c = 19,3 Mpa
Besi Polos Ukuran 8, 10, 12
Uk. Tulangan =
Besi Ulir Ukuran 13
Pelat Lantai 12 cm
Tebal Pelat =
Pelat Atap 10 cm

Pekerjaan Arsitektural
Dinding = Pas. Bata Merah, Plester dan Finishing Cat
Kusen Pintu Kayu Kamper Samarinda, Alum
Daun Pintu Teakwood, Alumunium, Besi
Pintu & Jendela =
Kusen dan Daun Jendela Berbahan Alumuniu
Pintu garasi besi henderson
Keramik Lantai Roman Ukuran 50x50, 33,33
Lantai Kayu Gracewood
Lantai =
Plint Lantai Kayu Tebal 2 cm Lebar 10 cm
Lantai carport berupa paving block ubin set d
Konstruksi Kuda-Kuda Kayu dan Gording m
Atap =
Rangka atap menggunakan kayu dengan baha
Plafond menggunakan gypsum Tebal 9 mm d
Plafond = Rangka plafond menggunakan kayu borneo
List plafond menggunakan gypsum

Keterangan Lain
Sanitasi = Bath Tube, Closet duduk, Closet Jongkok, W
Jumlah Kamar Mandi = 5
Jumlah Kamar Tidur = 5
Pekerjaan Struktur
tu Kali, Rollag Bata, Strauss Pile
utu Beton K-225 / f'c = 19,3 Mpa
si Polos Ukuran 8, 10, 12
si Ulir Ukuran 13
at Lantai 12 cm
at Atap 10 cm

Pekerjaan Arsitektural
s. Bata Merah, Plester dan Finishing Cat
sen Pintu Kayu Kamper Samarinda, Alumunium YKK, Besi
un Pintu Teakwood, Alumunium, Besi
sen dan Daun Jendela Berbahan Alumunium
tu garasi besi henderson
ramik Lantai Roman Ukuran 50x50, 33,33 x 33,33 , 20x20, 30x30, 10x30
ntai Kayu Gracewood
nt Lantai Kayu Tebal 2 cm Lebar 10 cm
ntai carport berupa paving block ubin set dan uk. Bata tebal 6 cm
nstruksi Kuda-Kuda Kayu dan Gording menggunakan Kayu Borneo Kelas II
ngka atap menggunakan kayu dengan bahan penutup atap genteng kanmuri
fond menggunakan gypsum Tebal 9 mm dan Tripleks tebal 6 mm
ngka plafond menggunakan kayu borneo
t plafond menggunakan gypsum

Keterangan Lain
th Tube, Closet duduk, Closet Jongkok, Wastafel, dan Kitchen Sink

Anda mungkin juga menyukai