109,010.00
115,610.00
126,280.00
152,790.00
232,650.00
132,990.00
84,700.00
55,000.00
104,500.00
93,500.00
312,500.00
99,100.00
198,000.00
44,000.00
2,149,000.00
1,196,900.00
1,089,000.00
1,331,000.00
385,000.00
385,000.00
181,500.00
60,500.00
1,243,334.00
1,851,300.00
1,089,000.00
1,295,000.00
396,000.00
350,000.00
425,000.00
750,000.00
250,000.00
325,000.00
125,000.00
2,420,000.00
50,833.33
150,000.00
335,000.00
94,000.00
320,000.00
60,000.00
136,000.00
1,102,000.00
1,800,000.00
229,166.67 0.72
1,200,000.00
198,000.00
Harga Satuan No. Uraian Pekerjaan
4 1 2
H. BAHAN KACA
11,847.00 611 Kaca polos 2 mm
11,847.00 612 Kaca polos 3 mm
14,400.00 613 Kaca polos 5 mm
11,847.00 614 Kaca polos 8 mm
11,847.00 615 Kaca Buram 12 mm
209,000.00 616 Kaca raybend 5 mm
117,370.00 617 Kaca raybend 8 mm
22,660.00 618 Kaca es 3 mm
205,420.00 619 Kaca es 5 mm
215,050.00 620 Kaca patri ex lokal terpasang
16,635.00 621 Kaca patri ex Luar Negeri terpasang
14,980.00 622 Glass Block 20 x 20 cm (ex. Luar)
14,980.00 623 Glass Block 20 x 20 cm (ex. DN)
15,965.00 Jendela Nako 10 mm minimalis
14,980.00 slot
24,976.67
75,000.00 624 Kaca Cermin 5 mm
13,750.00 K. BAHAN PENUTUP ATAP
56,500.00 683 Atap plastik gelombang , uk. 0,80 x 1,80
13,420.43 684 Atap Fibreglass tipis, uk. 0,80 x 1,80
18,571.00 685 Atap Fibreglass tebal, uk. 0,80 x 1,80
5,000.00 686 Atap asbes gelombang , uk. 1.05 x 1.80 x 4 mm
2,500.00 687 Atap asbes gelombang , uk. 1.05 x 2.10 x 5 mm
11,310.00 688 Atap asbes gelombang , uk. 1.05 x 2.40 x 4 mm
12,040.00 689 Atap asbes gelombang , uk. 1.05 x 2.70 x 4 mm
41,910.00 690 Atap asbes gelombang , uk. 1.05 x 3.00 x 4 mm
60,000.00 691 Atap asbes gelombang , uk. 1.10 x 1.80 x 5 mm
14,660.00 692 Atap asbes gelombang , uk. 1.10 x 2.00 x 5 mm
27,225.00 693 Atap asbes gelombang , uk. 1.10 x 2.25 x 5 mm
30,250.00 694 Atap asbes gelombang , uk. 1.10 x 2.50 x 5 mm
21,120.00 695 Atap asbes gelombang , uk. 1.10 x 3.00 x 5 mm
20,900.00 696 Atap asbes gelombang , uk. 1.10 x 1.80 x 6 mm
17,500.00 697 Atap asbes gelombang , uk. 1.10 x 2.00 x 6 mm
20,000.00 698 Atap asbes gelombang , uk. 1.10 x 2.25 x 6 mm
20,000.00 699 Atap asbes gelombang , uk. 1.10 x 2.50 x 6 mm
42,350.00 700 Atap asbes gelombang , uk. 1.10 x 3.00 x 6 mm
57,475.00 701 Atap seng gelombang , uk. 0,80 x 1,80
51,425.00 702 Atap seng gelombang , uk. 1,05 x 2,40
66,550.00 703 Atap Genteng metal (Zinkalum) Polos tebal 0,5 mm
51,500.00 704 Atap Genteng metal (Galvalum) Polos tebal 0,5 mm
53,240.00 705 Atap Genteng metal (Zinkalum) Tekstur tebal 0,5 mm
41,800.00 706 Atap Genteng metal (Galvalum) Tekstur tebal 0,5 mm
36,850.00 707 Atap Genteng palentong pres bakar KW. I, ex Jatiwangi
15,400.00 708 Atap Genteng palentong pres Molen Oven KW. I, ex Jatiwangi
17,600.00 709 Atap Genteng Vlaams pres Molen Oven KW. I, ex Jatiwangi
14,760.00 710 Atap Genteng keramik warna Stand. KIA
14,760.00 711 Atap Genteng keramik warna Khusus. KIA
14,760.00 712 Atap Genteng bubung Pres bulat
42,350.00 713 Atap Genteng bubung Pres segi tiga
50,000.00 714 Atap Genteng kodok natural, ex jatiwangi
55,000.00 715 Atap Genteng kodok glazuur, ex jatiwangi
66,000.00 716 Atap Genteng palentong super / besar natural, ex Jatiwangi
82,500.00 717 Atap Genteng palentong super / besar glazuur, ex Jatiwangi
187,000.00 718 Atap Genteng beton natural, Rengganis
214,500.00 719 Atap Genteng beton warna 14,4 / m2
198,000.00 720 Atap Genteng beton Natural 14,4 / m2
220,000.00 721 Atap Genteng Morando natural ex Jatiwangi
209,000.00 722 Atap Genteng Morando glazuur ex Jatiwangi
352,000.00 723 Bubung genteng keramik warna Stand. KIA
117,500.00 724 Bubung genteng keramik warna Khusus. KIA
359,420.00 725 Bubung genteng metal Rainbow
49,720.00 726 Bubung genteng metal Sakura
75,000.00 727 Genteng bubung segi tiga / bulat, natural
66,000.00 728 Genteng bubung segi tiga / bulat, glazuur
97,750.00 729 Genteng bubung beton natural Rengganis
440,000.00 730 Genteng bubung beton warna Rengganis
158,120.00 731 Genteng bubung natural Morando
189,750.00 732 Genteng bubung glazuur Morando
225,000.00 733 Genteng bubung palentong besar natural
2,750,000.00 734 Genteng bubung palentong besar glazuur
825,000.00 735 Atap genteng asbes, uk. 0.85 x 1.15
30,000.00 736 Nok genteng asbes, pj. 1.15 m
30,000.00 737 Nok stel gelombang, 0.92 m
40,000.00 738 Nok stel gelombang, 1.10 m
19,250.00 739 Nok stel rata, 1.10 m
38,500.00 740 Nok stel rata, 0.92 m
85,500.00 741 Nok paten rata, 1.05 m
16,764.71 742 Nok paten gelombang, 0.92 m
230,000.00 743 Nok paten gelombang, 1.05 m
200,000.00 744 Nok paten gelombang, 1.10 m
210,000.00 745 Atap aluminium, ULR - 7 ( l = 920 mm x 0.50 mm )
11,400,000.00 746 Nok atap aluminium std.
5,988,300.00 747 Almunium foil, uk. 1.25 x 60.00 m
1,100,000.00 748 Almunium foil, uk. 2.50 x 60.00 m
1,800,000.00 749 Atap sirap kelas I ( 1 m2 = 80 lb )
900,000.00 750 Twinlight ( 2.10 x 11.80 )
900,000.00 751 Alumunium foil
346,800.00 Atap Onduline 95x200 cm
Atap Onduline 95x200 cm
19,250.00 752 Roof Mesh
17,210.00
17,210.00
400
650
800
8,125.00
24,750.00
18,500.00
17,500.00
22,600.00
21,500.00
19,250.00
19,250.00
1,200.00
55,000.00
22,750.00
12,250.00
19,250.00
2,500.00
20,990.00
49,500.00
16,500.00
10,450.00
17,500.00
17,500.00
283.33
283.33
8,250.00
Satuan Harga Satuan No.
Rp. Rp.
3 4 1
L.
M² 60,500.00 753
M² 94,380.00 387,500.00 754
M² 87,500.00 755
M² 211,200.00 756
M² 594,000.00 757
M² 192,500.00 758
M² 412,500.00 759
M² 140,800.00 760
M² 198,000.00 761
M² 1,650,000.00 762
M² 4,840,000.00 763
Bh 105,875.00 764
Bh 18,000.00 765
set 395,000.00 766
767
768
M² 165,000.00 769
770
lbr 34,938.00 771
lbr 48,520.00 772
lbr 98,010.00 773
lbr 41,740.00 774
lbr 58,080.00 775
lbr 54,450.00 776
lbr 61,100.00 777
lbr 66,666.00 778
lbr 27,170.00 779
lbr 30,850.00 780
lbr 32,670.00 781
lbr 35,690.00 782
lbr 50,820.00 783
lbr 32,300.00 784
lbr 34,480.00 785
lbr 37,800.00 786
lbr 41,380.00 787
lbr 66,550.00 788
lbr 60,000.00 789
lbr 67,500.00 790
lbr 120,000.00 791
lbr 140,000.00 792
lbr 175,000.00 793
lbr 190,000.00 794
bh 1,600.00 795
bh 2,000.00 796
bh 1,800.00 797
bh 6,500.00 798
bh 10,675.00 799
bh 5,220.00 800
bh 4,730.00 801
bh 2,500.00 802
bh 3,250.00 803
bh 3,500.00 804
bh 2,200.00 805
bh 4,500.00 806
m2 106,370.00 807
M² 100,210.00 808
bh 6,500.00 809
bh 8,250.00 810
bh 14,570.00 811
bh 26,150.00 812
bh 82,500.00 813
bh 104,500.00 814
bh 1,750.00 815
bh 2,200.00 816
bh 4,200.00 817
bh 5,250.00 818
bh 6,500.00 819
bh 8,030.00 820
bh 2,750.00 821
bh 5,000.00 822
lbr 25,000.00 823
bh 21,780.00 824
lbr 33,270.00 825
lbr 33,270.00 826
lbr 26,000.00 827
lbr 40,000.00 828
lbr 19,360.00 829
lbr 12,100.00 830
lbr 16,330.00 831
lbr 20,320.00 832
M² 124,900.00 833
M² 71,060.00 834
M² 3,500.00 835
M² 4,750.00 836
lbr 2,500.00 837
lbr 2,437,000.00 L eff. 838
roll 2,178,000.00 1.56 839
m 148,500.00 840
m^2 95,192.31 841
roll 2,178,000.00 842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
Uraian Pekerjaan Satuan Harga Satuan
2 3 4
BAHAN ELEKTRIKAL
Lampu pijar 25 watt s/d 100 watt bh 20,000.00
Lampu Neon TL 20 watt bh 75,000.00
Lampu Neon TL 40 watt bh 90,000.00
Down Light + SL 25 watt bh 192,500.00
Lampu Sirkel TL 20 watt lengkap bh 70,000.00
Lampu Mercury 80 watt bh 175,000.00
Lampu Mercury 250 watt bh 548,240.00
Lampu Mercury 400 watt bh 1,072,500.00
Lampu Sodium 250 watt bh 880,000.00
Lampu Sodium 400 watt bh 2,420,000.00
Lampu Taman + Tiang + Lampu 1 buah bh 423,500.00
Lampu Baret 30 cm + Neon bh 363,000.00
Lampu Neon Acrylik 2 x 40 watt bh 247,500.00
Reflektor (Mata kucing) bh 108,900.00
Jarum Penangkal Petir 16 bh 365,640.00
Kawat BC (Tembaga) kg 239,450.00
Pentanahan Penangkal Petir ttk 165,000.00
Pentanahan Panel ttk 121,000.00
Kabel power m' 6,050.00
Kabel Elektroda m' 9,350.00
Elektroda bh 33,000.00
Panel Elektroda unit 1,210,000.00
Box Lampu 2 Aspek Warning Light (Dia. 30 cm) bh 3,873,000.00
Control WL dengan Konfigurasi (Double Fisher) bh 8,520,700.00
Terminal Kabel bh 24,750.00
Armartur bh 275,000.00
Tiang Lurus btg 1,394,250.00
Tiang Lengkung untuk Tarffic Light bh 2,897,070.00
Box Lampu 2 Aspek untuk Traffic Light bh 1,874,510.00
Box Lampu 3 Aspek bh 2,811,820.00
Controler 4 phase 2 Pedestrian dan Box Luar Set 30,250,000.00
Tanki air fibre glass kap. 500 liter ex PINGUIN bh 792,000.00
Tanki air fibre glass kap. 1000 liter segi empat bh 1,467,070.00
Tanki air fibre glass kap. 1000 liter bulat bh 1,760,440.00
Tanki air fibre glass kap. 2000 liter bulat bh 5,868,280.00
Tanki air stainless kap. 1500 liter bh 3,712,500.00
Tanki air stainless kap. 500 liter bh 2,062,500.00
Tiang listrik khusus lengkung cabang dua Ø 5" 4" 3" panjang 10 M bh 4,284,000.00
Tiang listrik khusus tunggal Ø 5" 4" 3" panjang 10 M bh 3,894,000.00
Tiang listrik bentuk tunggal Ø 5" 4" 3" panjang 9 M bh 3,432,000.00
Tiang listrik khusus lurus cabang dua Ø 5" 4" 3" panjang 9 M bh 4,290,000.00
Stang armartur Ø 2½", 2" panjang 5 M bh 950,400.00
Stang armartur Ø 2" panjang 3 M bh 567,600.00
Armartur HRC 511 125 W / 220 V komplit "Phillips" bh 3,597,000.00
Armartur SRP 822 Son E 150 W / 220 V komplit "Sumico" bh 3,348,180.00
Armartur SRP 822 Son E 250 W / 220 V komplit "Sumico" bh 1,643,400.00
Armartur SRG Full R Son E 150 W / 220 V komplit "Sumico" bh 1,914,000.00
Armartur SRG Full R Son E 250 W / 220 V komplit "Sumico" bh 1,090,800.00
Armartur SRG Full R Son E 70 W / 220 V komplit "Sumico" bh 1,452,000.00
Armartur HRG Full R Hpin E 150 W / 220 V komplit "Sumico" bh 1,452,000.00
Armartur HRG Full R Hpin E 250 W / 220 V komplit "Sumico" bh 726,000.00
Armartur CLS 15 70 W HPS / 220 V komplit "Creation" bh 2,112,000.00
Armartur CLS 25 70 W HPS / 220 V komplit "Creation" bh 290,400.00
Armartur CLS 25 150 W HPS / 220 V komplit "Creation" bh 3,564,000.00
Armartur CLS 25 250 W HPS / 220 V komplit "Creation" bh 4,224,000.00
Armartur CLS 25 150/100 W HPS / 220 V komplit "Creation" bh 5,016,000.00
Armartur CLS 25 150/150 W HPS / 220 V komplit "Creation" bh 5,544,000.00
Armartur CLS 40 400/250 W HPS / 220 V komplit "Creation" bh 6,336,000.00
Armartur CLS 40 400 W HPS / 220 V komplit "Creation" bh 5,016,000.00
Armartur CLS 30 250 W MH / 220 V komplit "Creation" bh 3,696,000.00
Armartur CLS 40 400 W MH / 220 V komplit "Creation" bh 4,620,000.00
Armartur ERL8 2x TL 18 W 54 / 220 V komplit "Creation" bh 924,000.00
Armartur CLS 15 LHE 46 W / 220 V komplit "Creation" bh 1,056,000.00
Armartur M2AR HPS/MH 70 W / 220 V komplit "GE" bh 2,435,400.00
Armartur M2AR HPS/MH 150 W / 220 V komplit "GE" bh 2,654,190.00
Armartur M2AR HPS/MH 250 W / 220 V komplit "GE" bh 2,851,530.00
Armartur COR HPS/MH 150 W / 220 V komplit "GE" bh 3,419,460.00
Armartur COR HPS/MH 250 W / 220 V komplit "GE" bh 3,619,770.00
Armartur COR HPS/MH 400 W / 220 V komplit "GE" bh 3,876,840.00
Armartur COR HPS/MH 150-100 W / 220 V (Durning) komplit "GE" bh 3,745,930.00
Armartur COR HPS/MH 250-150 W / 220 V (Durning) komplit "GE" bh 4,078,240.00
Armartur COR HPS/MH 400-250 W / 220 V (Durning) komplit "GE" bh 4,508,230.00
Armartur SVRA HPS/MH 175 W / 220 V komplit "GE" bh 8,316,000.00
Armartur OLY HPS/MH 250 W / 220 V komplit "GE" bh 3,597,000.00
Armartur OLY HPS/MH 150 W / 220 V komplit "GE" bh 3,399,000.00
Armartur OLY HPS/MH 150-100 W / 220 V (Durning) komplit "GE" bh 3,652,110.00
Armartur OLY HPS/MH 250-150 W / 220 V (Durning) komplit "GE" bh 3,993,000.00
Armartur OLY HPS/MH 400-250 W / 220 V (Durning) komplit "GE" bh 4,448,400.00
Armartur SGN HPS/MH 400 W / 220 V komplit "GE" bh 3,803,250.00
Armartur SGN HPS/MH 250 W / 220 V komplit "GE" bh 3,465,000.00
Armartur SGN HPS/MH 150 W / 220 V komplit "GE" bh 3,267,000.00
Armartur HPS 150-100 W / 220 V (Durning) komplit "GE" bh 3,531,000.00
Armartur HPS 250-150 W / 220 V (Durning) komplit "GE" bh 3,894,000.00
Armartur HPS 400-250 W / 220 V (Durning) komplit "GE" bh 4,356,000.00
Armartur DURA HPS 70 W / 220 V komplit "GE" bh 2,211,000.00
Armartur DURA HPS 150 W / 220 V komplit "GE" bh 2,381,280.00
Armartur PF1K HPS 1000 W / 220 V komplit "GE" bh 13,695,000.00
Armartur PF1K MH 1000 W / 220 V komplit "GE" bh 14,602,500.00
Armartur MH 2000 W / 220 V komplit "GE" bh 23,100,000.00
Armartur MH 1000 W / 220 V komplit "GE" bh 20,790,000.00
Armartur NR-83 SON 100 W / 220 V komplit "NIKO" bh 1,320,000.00
Armartur NR-83 SON 150 W / 220 V komplit "NIKO" bh 1,421,640.00
Armartur NR-83 HPLN 250 W / 220 V komplit "NIKO" bh 1,421,640.00
Armartur NR-83 HPLN 100 W / 220 V komplit "NIKO" bh 1,523,280.00
Armartur NR-83 HPLN 150 W / 220 V komplit "NIKO" bh 1,015,080.00
Armartur NR-98A HPLN 125 W / 220 V komplit "NIKO" bh 1,421,640.00
Armartur NR-98A SON 70 W / 220 V komplit "NIKO" bh 1,523,280.00
Armartur NR-98B SON 150 W / 220 V komplit "NIKO" bh 221,640.00
Armartur NR-98B SON 250 W / 220 V komplit "NIKO" bh 1,523,280.00
Armartur NR-98B HPLN 125 W / 220 V komplit "NIKO" bh 1,421,640.00
Armartur NR-791 SON 150 W / 220 V komplit "NIKO" bh 1,726,560.00
Armartur NR-791 SON 250 W / 220 V komplit "NIKO" bh 1,827,540.00
Armartur NR-791 SON 400 W / 220 V komplit "NIKO" bh 1,929,180.00
Armartur NR-791 MH-T 250 W / 220 V komplit "NIKO" bh 1,685,640.00
Armartur NR-793 HPI 400 W / 220 V komplit "NIKO" bh 2,956,920.00
Armartur NR-793 SON-T 400 W / 220 V komplit "NIKO" bh 2,843,280.00
Armartur NR-794 SON 400 W / 220 V komplit "NIKO" bh 2,030,820.00
Armartur NR-794 HPI 400 W / 220 V komplit "NIKO" bh 2,132,460.00
Armartur NR-798 SON-I 70 W / 220 V komplit "NIKO" bh 1,218,360.00
Armartur NR-822 SON 250 W / 220 V komplit "NIKO" bh 1,827,540.00
Armartur NR-822 SON 400 W / 220 V komplit "NIKO" bh 1,929,180.00
Armartur NR-822 HPLN 250 W / 220 V komplit "NIKO" bh 1,631,880.00
Armartur NR-822 HPLN 400 W / 220 V komplit "NIKO" bh 1,776,720.00
Armartur NR-921 SON-T 250 W / 220 V komplit "NIKO" bh 3,350,820.00
Armartur NR-921 SON-T 400 W / 220 V komplit "NIKO" bh 3,452,460.00
Armartur NR-921 HPI-T 250 W / 220 V komplit "NIKO" bh 3,452,460.00
Armartur NR-921 HPI-T 400 W / 220 V komplit "NIKO" bh 3,554,100.00
Armartur NR-419 SON 150 W / 220 V komplit "NIKO" bh 2,172,720.00
Armartur NL-127 HPI-T 1000 W / 220 V komplit "NIKO" bh 5,584,920.00
Armartur RL ARTO C SON 250 W / 220 V komplit "ARTOLITE" bh 1,864,500.00
Armartur RL ARTO C HPLN 250 W / 220 V komplit "ARTOLITE" bh 1,648,740.00
Armarture HRC 511-LHE 85W / 220 V komplit bh 990,000.00
Armarture HRC 510-LHE 45W / 220 V komplit bh 726,000.00
Armarture HRC 504-LHE 85W / 220 V komplit bh 924,000.00
Armarture HRC 504-LHE 45W / 220 V komplit bh 660,000.00
Armarture SRP 822-LHE 85W / 220 V komplit bh 1,056,000.00
Armarture GLOBAL 1 70W / 220 V komplit "NORDEX" bh 2,211,000.00
Armarture GLOBAL 1 150W / 220 V komplit "NORDEX" bh 2,376,000.00
Armarture GLOBAL 2 150W / 220 V komplit "NORDEX" bh 2,422,000.00
Armarture GLOBAL 2 250W / 220 V komplit "NORDEX" bh 2,540,000.00
Armarture GLOBAL 2 400W / 220 V komplit "NORDEX" bh 2,831,400.00
Armarture GLOBAL 2 Bilevel 150-100 W / 220 V komplit "NORDEX" bh 3,524,400.00
Armarture GLOBAL 2 Bilevel 250-150 W / 220 V komplit "NORDEX" bh 3,861,000.00
Armarture GLOBAL 2 Bilevel 400-250 W / 220 V komplit "NORDEX" bh 4,224,000.00
Armarture ANVA 2 150 W / 220 V komplit "NORDEX" bh 3,828,000.00
Armarture ANVA 2 250 W / 220 V komplit "NORDEX" bh 3,583,800.00
Armarture ANVA 2 400 W / 220 V komplit "NORDEX" bh 3,372,600.00
Armarture ANVA 2 Bilevel 150-100 W / 220 V komplit "NORDEX" bh 3,707,100.00
Kabel NYFGBY 4x10 qmm (Supreme) rol 128,700.00
Kabel NYFGBY 4x25 qmm (Supreme) rol 229,940.00
Kabel NYM 3x2,5 qmm "Prime / Eterna" M¹ 8,340.00
Kabel TIC 2x10 qmm "SPLN" Lokal M¹ 5,940.00
Kabel TIC 4x10 qmm "SPLN" Lokal M¹ 11,880.00
Kabel NYY 3x4 qmm "Prime / Eterna" M¹ 34,320.00
Kabel NYY 4x10 qmm "Prime / Eterna" M¹ 61,920.00
Photo Cell 10 A "Celecal" bh 138,600.00
Photo Cell 6 A "Celecal" bh 116,700.00
Photo Cell 3 A "Celecal" bh 73,500.00
Photo Cell 6 A "NIKO" bh 132,000.00
Time Switch "NS A Setur" bh 396,000.00
Time Switch 16 A 220/50 Hz 12 Hours "NIKO" bh 386,760.00
Time Switch Diming Esco I bh 186,120.00
Kontaktor 100 A "Mitsubishi" bh 844,800.00
Kontaktor 125 A "Mitsubishi" bh 1,128,600.00
Kontaktor 3 Phase "NIKO" bh 70,450.00
Widge bh 19,800.00
M C B 10 A bh 38,225.00
M C B 16 A bh 38,940.00
M C B 20 A bh 51,350.00
M C B Domae 1 phase 25 A bh 47,520.00
M C B 50 A bh 126,060.00
Ballast BHL 250W / 220V "Phillips" bh 273,240.00
Ballast BHL 125W / 220V "Phillips" bh 158,870.00
Ballast BHL 80W / 220V "Phillips" bh 138,120.00
Ballast BSN 150W / 220V "Phillips" bh 207,970.00
Ballast BSN 250W / 220V "Phillips" bh 302,700.00
Ballast BSN 400W / 220V "Phillips" bh 588,770.00
Ballast HC 200 NG 70W / 220V "Creation" bh 184,800.00
Ballast HC 200 NG 150W / 220V "Creation" bh 231,000.00
Ballast HC 200 NG 250W / 220V "Creation" bh 356,400.00
Ballast HC 200 NG 400W / 220V "Creation" bh 448,800.00
Ballast HC 22050 NG 150W / 220V "Creation" bh 858,000.00
Ballast HC 22050 NG 250W / 220V "Creation" bh 897,600.00
Ballast HC 22050 NG 400W / 220V "Creation" bh 937,200.00
Ballast MBS 70W / 220V "GE" bh 205,390.00
Ballast MBS 150W / 220V "GE" bh 380,950.00
Ballast MBS 250W / 220V "GE" bh 458,700.00
Ballast MBS 400W / 220V "GE" bh 603,100.00
Ballast MBS 1000W / 220V "GE" bh 1,452,000.00
Ballast MBS BI-Level 150-100W / 220V "GE" bh 575,520.00
Ballast MBS BI-Level 250-150W / 220V "GE" bh 676,820.00
Ballast MBS BI-Level 400-250W / 220V "GE" bh 790,410.00
Ballast BSN 70W / 220V "NIKO" bh 132,000.00
Ballast BSN 150W / 220V "NIKO" bh 198,000.00
Ballast BSN 250W / 220V "NIKO" bh 213,180.00
Ballast BSN 400W / 220V "NIKO" bh 330,000.00
Ballast BSN 1000W / 220V "NIKO" bh 1,188,000.00
Ballast BHL 80W / 220V "NIKO" bh 112,200.00
Ballast BHL 125W / 220V "NIKO" bh 132,000.00
Ballast BHL 250W / 220V "NIKO" bh 198,000.00
Ballast BHL 400W / 220V "NIKO" bh 213,180.00
Ballast BMH 70W / 220V "NIKO" bh 122,100.00
Ballast BMH 150W / 220V "NIKO" bh 182,820.00
Ballast BMH 250W / 220V "NIKO" bh 198,000.00
Ballast BMH 400W / 220V "NIKO" bh 253,440.00
Ballast BMH 1000W / 220V "NIKO" bh 1,116,720.00
Ballast Dimming SON 250W/220V BSD 250 L 4061 TS "PHILLIPS" bh 553,210.00
Ballast Dimming SON 150W/220V BSD 250 L 4061 TS "PHILLIPS" bh 464,640.00
Ballast HPS NORDEX 70W / 220V 50 Hz "NAMH" bh 198,000.00
Ballast HPS NORDEX 150W / 220V 50 Hz "NAMH" bh 363,000.00
Ballast HPS NORDEX 250W / 220V 50 Hz "NAMH" bh 451,440.00
Ballast HPS NORDEX 400W / 220V 50 Hz "NAMH" bh 594,520.00
Ballast HPS NORDEX 150-100W / 220V 50 Hz bilevel "NAMH" bh 574,200.00
Ballast HPS NORDEX 250-150W / 220V 50 Hz bilevel "NAMH" bh 671,880.00
Ballast HPS NORDEX 400-100W / 220V 50 Hz bilevel "NAMH" bh 788,830.00
Lampu SON 400W/220V "PHILLIPS" bh 175,560.00
Lampu SON 250W/220V "PHILLIPS" bh 143,220.00
Lampu SON 150W/220V "PHILLIPS" bh 124,080.00
Lampu HPL 250W/220V "PHILLIPS" bh 65,340.00
Lampu HPL 125W/220V "PHILLIPS" bh 29,700.00
Lampu HPL 80W/220V "PHILLIPS" bh 29,700.00
Lampu LHE 40W/220V "HITACHI" bh 133,980.00
Lampu LHE 65W/220V "SINYOKU" bh 191,400.00
Lampu LHE 85W/220V "SINYOKU" bh 264,000.00
Lampu HC/NG 70W/220V "CREATION" bh 224,400.00
Lampu HC/NG 150W/220V "CREATION" bh 244,200.00
Lampu HC/NG 250W/220V "CREATION" bh 257,400.00
Lampu HC/NG 400W/220V "CREATION" bh 277,200.00
Lampu LU 70W/220V (Internal Ignitor) Komplit "GE" bh 192,880.00
Lampu LU 150W/220V (Internal Ignitor) Komplit "GE" bh 229,890.00
Lampu LU 250W/220V (Internal Ignitor) Komplit "GE" bh 262,180.00
Lampu LU 400W/220V (Internal Ignitor) Komplit "GE" bh 297,750.00
Lampu LU 1000W/220V (Internal Ignitor) Komplit "GE" bh 1,315,870.00
Lampu Mercury E27 80W / 220V Komplit "NIKO" bh 60,720.00
Lampu Mercury E27 125W / 220V Komplit "NIKO" bh 66,000.00
Lampu Mercury E40 250W / 220V Komplit "NIKO" bh 81,180.00
Lampu Mercury E40 400W / 220V Komplit "NIKO" bh 101,500.00
Lampu Mercury Blanded E27 160W / 220V Komplit "NIKO" bh 186,000.00
Lampu Mercury Blanded E40 250W / 220V Komplit "NIKO" bh 81,180.00
Lampu Mercury Blanded E40 500W / 220V Komplit "NIKO" bh 101,500.00
Lampu Sodium Self-Ignited E27 70W / 220V Komplit "NIKO" bh 132,000.00
Lampu Sodium Self-Ignited E40 150W / 220V Komplit "NIKO" bh 162,360.00
Lampu Sodium Tubular 170W / 220V Komplit "NIKO" bh 132,000.00
Lampu Sodium Tubular 100W / 220V Komplit "NIKO" bh 152,460.00
Lampu Sodium Tubular 150W / 220V Komplit "NIKO" bh 162,360.00
Lampu Sodium Tubular 250W / 220V Komplit "NIKO" bh 182,820.00
Lampu Sodium Tubular 400W / 220V Komplit "NIKO" bh 203,280.00
Lampu Sodium Tubular 1000W / 220V Komplit "NIKO" bh 1,117,380.00
Lampu Metal Hilide 70W / 220V Komplit "NIKO" bh 182,820.00
Lampu Metal Hilide 100W / 220V Komplit "NIKO" bh 182,820.00
Lampu Metal Hilide 150W / 220V Komplit "NIKO" bh 203,940.00
Lampu Metal Hilide 250W / 220V Komplit "NIKO" bh 223,740.00
Lampu Metal Hilide 400W / 220V Komplit "NIKO" bh 243,540.00
Lampu Metal Hilide 1000W / 220V Komplit "NIKO" bh 1,218,360.00
Ignator "PHILLIPS" bh 68,640.00
Ignator HCIG-NG 70W "CREATION" bh 85,800.00
Ignator HCIG-NG 150W "CREATION" bh 85,800.00
Ignator HCIG-NG 250W "CREATION" bh 85,800.00
Ignator HCIG-NG 400W "CREATION" bh 85,800.00
Ignator MSI 70-400W "GE" bh 260,480.00
Ignator CD-8A For Sodium 70-150W "NIKO" bh 66,000.00
Ignator SN-58 For Sodium 70-400W "NIKO" bh 79,200.00
Ignator CD-8C For Sodium 1000W "NIKO" bh 92,400.00
Ignator CD-8B Metal Hilide 1000W "NIKO" bh 92,400.00
Ignator Dimming SU41 s "PHILLIPS" bh 123,280.00
Kapasitor "PHILLIPS" bh 51,480.00
Kapasitor HCCC-12 70W "CREATION" bh 43,560.00
Kapasitor HCCC-18 150W "CREATION" bh 59,400.00
Kapasitor HCCC-22 250W "CREATION" bh 85,800.00
Kapasitor HCCC-50 400W "CREATION" bh 132,000.00
Kapasitor / Ignator 12 Uf 70W "GE" bh 111,310.00
Kapasitor / Ignator 18 Uf 150W "GE" bh 130,580.00
Kapasitor / Ignator 32 Uf 250W "GE" bh 178,110.00
Kapasitor / Ignator 50 Uf 400W "GE" bh 238,220.00
Kapasitor / Ignator HPS NORDEX 12 Uf 70W "GE" 50Hz bh 110,220.00
Kapasitor / Ignator HPS NORDEX 18 Uf 150W "GE" 50Hz bh 133,320.00
Kapasitor / Ignator HPS NORDEX 32 Uf 250W "GE" 50Hz bh 174,900.00
Kapasitor / Ignator HPS NORDEX 50 Uf 400W "GE" 50Hz bh 231,000.00
Kapasitor 10 Uf "NIKO" bh 46,200.00
Kapasitor 20 Uf "NIKO" bh 87,780.00
Kapasitor 30 Uf "NIKO" bh 120,780.00
Kapasitor 50 Uf "NIKO" bh 153,780.00
Tap Konektor "Lokal" bh 16,500.00
Box panel ukuran 20 x 40 x 60 cm bh 792,120.00
Terminal kabel No. 16 "Ligrand / Licon " bh 48,180.00
Terminal kabel No. 10 "Ligrand / Licon " bh 31,020.00
Klem Stang komplit bh 363,000.00
Isolasi besar bh 7,520.00
Avometer bh 396,000.00
Tespen bh 10,800.00
Obeng besar Daun (-) bh 29,040.00
Obeng besar Daun (+) bh 29,040.00
Tang besar bh 22,500.00
Tang Ampere bh 415,800.00
Lampu LED TL Philips 16 w bh 70,000.00
Lampu LED Philips 5w bh 30,200.00
Pipa Listrik 5/8" btg 6,500.00
T Dus bh 6,000.00
L Bow 5/8" bh 1,100.00
Kabel LAN Belden UTP cat 56 m 5,500.00
Connector AMP UTP cat5e bh 3,500.00
Klem Kabel Shukaku 10mm bh 200.00
Stop Kontak Panasonic WESJP1121MWS bh 34,830.00
Saklar Tunggal Schneider Neo Horizonal bh 46,000.00
Saklar Ganda Schneider Neo Horizonal bh 69,250.00
Stop Kontak Antena TV Broco bh 36,000.00
Stop Kontak Telepon Schneider Leona bh 34,900.00
Fitting Lampu Downlight Philips 4" bh 45,900.00
Kap Housing Lampu LED TL Philips bh 40,000.00
Las Doof 2.5-4 mm bh 275.00
Lampu Senter Hologen bh 264,000.00
No. Uraian Pekerjaan Satuan
Rp.
1 2 3
M. BAHAN ALAT PENGGANTUNG / KUNCI
1038 Kunci Silinder untuk pintu Almunium setara ALPHA bh
1039 Kunci Silinder untuk pintu Almunium setara AKN bh
1040 Tarikan pintu aluminium bh
1041 Handle pintu aluminium bh
Handle 2 bh
Handle 1 set
Kunci Pintu set
kait angin bh
Slot Jendela bh
daun jendela Pj1=Pj2 bh
acc ls
1042 Handle pintu type besar psg
1043 Rel Handerson lengkap bh
1044 Rel Marathon 1 Pintu Bh
1045 Kunci slaag Silinder asli Type 210 s/d 226 bh
1046 Kunci slaag Anchor asli Bh
1047 Kunci pintu Union/Royal Type besar bh
1048 Kunci pintu Union/Royal Type kecil bh
1049 Kunci pintu Cap KUDA TERBANG Type besar bh
1050 Kunci pintu Cap KUDA TERBANG Type kecil bh
1051 Kunci pintu SES Type besar bh
1052 Kunci pintu SES Type kecil bh
1053 Kunci pintu KM/WC, ALPHA bh
1054 Grendel tanam pintu ganda ( espagnolet ) bh
1055 Grendel jendela biasa 15 cm bh
1056 Grendel jendela biasa 5 cm bh
1057 Hak angin kait biasa bh
1058 Hak angin jendela antik bh
1059 Hak angin stainless bh
1060 Jendela Nako Lengkap Tralis 1 Daun Bh
1061 Grendel pintu biasa ( selot ) bh
1062 Sloot Pintu berikut rantai bh
1063 Sloot Jendela Tunggal bh
1064 Engsel pintu solid 4" psg
1065 Engsel pintu solid 3" psg
1066 Engsel jendela biasa psg
1067 Engsel angin psg
1068 Tarikan Lemari rata-rata
1069 Engsel pintu Almunium ( Floor Hinge ), ex DORMA, uk. Pintu Standard bh
1070 Engsel pintu Almunium ( Floor Hinge ), ex AKN, uk. Pintu Standard bh
1071 Grendel jendela ( spring knip ) bh
1072 Kunci pintu Lemari bh
1073 Door stop type 013 / GP bh
1074 Door stop type 013 / S bh
1075 Door stop type 014 / US 3 bh
1076 Kunci tanam bh
Rel Pintu Henderson Track 4 m set
Rel Pintu Henderson Track 4 m set
Rel Pagar set
Rel pintu sorong pintu set
1076 Door closer bh
O. BAHAN PENGISAP AIR SUMUR DALAM
1092 Pompa Kodok unit
1093 Pompa Tangan Lokal unit
1094 Pompa Tangan Luar unit
1095 Mesin Pompa Air 100 watt unit
1096 esin Pompa Air 150 watt unit
1097 Pompa Jet pump 250 watt Unit
1098 Pompa jetpump 450 watt unit
1099 Pompa Submersible pump, Kap. 150 liter/menit 3 KW unit
1100 Gear Pump Kap. 60 liter / menit unit
1101 Deep Well dengan kelengkapannya Kap. 150 liter/menit unit
1102 Hand Oil Pump unit
1103 Gear Pump Kap. 60 liter / menit unit
1104 Water Heather unit
Harga Satuan No. Uraian Pekerjaan Satuan Harga Satuan
Rp.
4 1 2 3 4
R. BETON PRACETAK
330,000.00 I. PANEL DINDING BETON BERONGGA ( WALL )
396,000.00 1 Type 100.05.8 M² 196,920.00
225,000.00 II. HALF SLAB
330,000.00 1 Type 80.05.5 M² 130,310.00
211,700.00 III Biaya Pasang ( siang )
125,000.00 1 Biaya Pasang 120 M² 13,910.00
50,000.00 2 Biaya Pasang 150 M² 14,640.00
23,500.00 3 Biaya Pasang 200 M² 15,370.00
29,000.00 IV Biaya Pasang ( malam )
412,500.00 1 Biaya Pasang 120 M² 27,830.00
48,000.00 2 Biaya Pasang 150 M² 28,550.00
264,000.00 3 Biaya Pasang 200 M² 29,280.00
247,500.00 V PAGAR BETON PRACETAK
203,500.00 1 Panel 240.40.5 lbr 73,200.00
175,000.00 VI H - BEAM
150,000.00 1 260 btg 177,200.00
90,000.00 2 300 btg 204,970.00
75,000.00 3 340 btg 232,800.00
80,000.00 4 360 btg 246,710.00
65,000.00 5 380 btg 260,630.00
225,000.00 6 420 btg 288,460.00
165,000.00 VII PONDASI STRAUSZ
125,000.00 1 Dia 40 - 150 ttk 239,390.00
45,000.00 2 Dia 40 - 200 ttk 318,470.00
15,000.00 VIII PONDASI BATU KALI
6,500.00 1 Menerus 1 Pc : 4 Psr M³ 649,772.00
12,500.00 IX. BIAYA PASANG
17,500.00 1 Biaya pasang kondisi 1 M² 14,640.00
22,500.00 2 Biaya pasang kondisi 2 M² 17,760.00
35,000.00 3 Biaya pasang kondisi 3 M² 19,360.00
10,000.00 S TIANG PANCANG ( PILE )
12,500.00 1 TRIPLE 28 ( D 16 ) M¹ 111,320.00
10,000.00 2 TRIPLE 32 ( D 19 ) M¹ 137,630.00
60,000.00 3 TRIPLE 28 ( D 13 ) M¹ 98,130.00
42,000.00 4 TRIPLE 32 ( D 16 ) M¹ 130,310.00
17,500.00 5 SQUARE 20 ( D 13 ) M¹ 106,900.00
35,750.00 6 SQUARE 25 ( D 16 ) M¹ 169,880.00
45,000.00 T. LAIN-LAIN
850,000.00 1 Karbit M¹ 15,000.00
700,000.00 2 Ayakan Sortiran bh 46,970.00
15,000.00 3 Air PDAM M³ 8,000.00
17,500.00 4 Happa M² 35,200.00
35,000.00 5 Waring M² 29,370.00
26,400.00 6 Hi-Blow (60 titik) bh 1,920,500.00
19,500.00 7 Hi-Blow (100 titik) bh 2,667,400.00
101650 8 Mob/Demob. Dalam kota unit 2,818,390.00
698000
1838213.4677 10534.1746
776525 10.5341746
175000 2.63354365
325,000.00 4.45
1.1125
275,000.00
385,000.00
968,000.00
1,760,000.00
2,475,000.00
6,050,000.00
8,250,000.00
32,432,000.00
18,532,600.00
269,820,200.00
5,560,700.00
18,532,600.00
234,740.00
No. Uraian Pekerjaan Satuan Harga Satuan (Rp)
1 2 3 4
U. UPAH KERJA
1 Pekerja Oh 95,600.00
2 Tukang Gali Oh 109,300.00
3 Tukang Batu Oh 109,300.00
4 Tukang Kayu Oh 109,300.00
5 Tukang Cat / Pelitur Oh 109,300.00
6 Tukang Besi Beton Oh 109,300.00
7 Tukang Besi Profil Oh 109,300.00
8 Tukang Besi Konstruksi Oh 109,300.00
9 Tukang Allumunium Oh 109,300.00
10 Tukang Las Oh 109,300.00
11 Tukang Las Konstruksi Oh 109,300.00
12 Tukang Pipa Oh 109,300.00
13 Tukang Vibrator Oh 109,300.00
14 Tukang Erection Oh 109,300.00
15 Tukang Listrik Oh 109,300.00
16 Operator Alat Berat Oh 131,000.00
17 Operator Crane Oh 131,000.00
18 Operator Oh 131,000.00
19 Pembantu Operator Crane Oh 95,600.00
20 Pembantu Tukang Oh 95,600.00
21 Kepala Tukang Oh 120,000.00
22 Mandor Oh 131,000.00
A Pekerjaan Persiapan
A.1 Pekerjaan Pembersihan Lapangan
A.2 Pembuatan Pagar Sementara dari Seng Gelombang dengan Tinggi 1,8 m
A.3 Pembuatan Direksi Keet
A.4 Pembuatan Los Kerja
A.5 Pengukuran dan Pemasangan 1m bouwplank
A.6 Pembuatan Papan Nama Proyek
B Pekerjaan Tanah
B.1 Pekerjaan Galian Tanah Sedalam 1 m (Untuk Pondasi Batu Kali)
B.2 Pekerjaan Galian Tanah Sedalam 1,5 m (Galian Pondasi Pile Cap dan Setempat)
B.3 Pekerjaan Urugan Tanah Kembali 1/3 Galian
C Pekerjaan Pondasi
C.1 Pekerjaan Pondasi Batu Kali
C.1.1 Pekerjaan Urugan Pasir
C.1.2 Pekerjaan Pasangan Bata (Pondasi Rollag)
C.1.3 Pekerjaan Adukan Beton Pondasi
C.1.4 Pekerjaan Penulangan Beton Pondasi
C.1.5 Pekerjaan Bekisting
C.2 Pekerjaan Pondasi Setempat
c.2.1 Pekerjaan Adukan Beton Pondasi
C.2.2 Pekerjaan Penulangan Beton Pondasi
C.2.3 Pekerjaan Bekisting
C.3 Pekerjaan Pondasi Pile Cap
C.3.1 Pekerjaan Adukan Beton Pondasi
C.3.2 Pekerjaan Penulangan Beton Pondasi
C.3.3 Pekerjaan Bekisting
D Pekerjaan Beton
D.1 Pekerjaan Kolom
D.1.1 Pekerjaan Beton Struktur
D.1.2 Pekerjaan Penulangan Beton
D.1.3 Pekerjaan Bekisting
D.2 Pekerjaan Balok
D.2.1 Pekerjaan Beton Struktur
D.2.2 Pekerjaan Penulangan Beton
D.2.3 Pekerjaan Bekisting
D.3 Pekerjaan Sloof
D.3.1 Pekerjaan Beton Struktur
D.3.2 Pekerjaan Penulangan Beton
D.3.3 Pekerjaan Bekisting
D.4 Pekerjaan Tangga
D.4.1 Pekerjaan Beton Struktur
D.4.2 Pekerjaan Penulangan Beton
D.4.3 Pekerjaan Bekisting
D.5 Pekerjaan Ringbalk
D.5.1 Pekerjaan Beton Struktur
D.5.2 Pekerjaan Penulangan Beton
D.5.3 Pekerjaan Bekisting
D.6 Pekerjaan Plat Lantai
D.6.1 Pekerjaan Beton Struktur
D.6.2 Pekerjaan Penulangan Beton
D.6.3 Pekerjaan Bekisting
D.7 Pekerjaan Dak Beton
D.7.1 Pekerjaan Beton Struktur
D.7.2 Pekerjaan Penulangan Beton
D.7.3 Pekerjaan Bekisting
E Pekerjaan Dinding
E.1 Pekerjaan Pasangan Bata Merah 1/2 Bt (1 pc : 4 Ps)
E.2 Pekerjaan Plesteran tebal 2 cm
E.3 Pekerjaan Acian
E.4 Pekerjaan Dinding Keramik
E.5 Pekerjaan Bata Roster
F Pekerjaan Lantai
F.1 Pekerjaan Lantai 20x20, 30x30, 33x33, 50x50
F.2 Pekerjaan Plint Lantai
G Pekerjaan Kusen, Pintu dan Jendela
G.1 Pekerjaan Pemasangan Kusen Pintu dan Kusen Jendela Kayu
G.2 Pekerjaan Pemasangan Rangka Pintu dan Jendela Kayu
G.3 Pekerjaan Pemasangan Daun Teakwood Rangkap
G.4 Pekerjaan Pemasangan Rangka Pintu Besi Square Tube
G.5 Pekerjaan Pemasangan Pintu Rolling Door Besi
G.6 Pekerjaan Pemasangan Kusen Pintu dan Jendela Alumunium
G.7 Pekerjaan Pemasangan Rangka Pintu dan Jendela Alumunium
G.8 Pekerjaan Pemasangan Rangka Pintu Kaca Alumunium
G.9 Pekerjaan Pemasangan Engsel Pintu
G.10 Pekerjaan Pemasangan Engsel Jendela Kupu-kupu
G.11 Pekerjaan Pemasangan Kunci Selot
G.12 Pekerjaan Pemasangan Door Holder / Pegangan Pintu
G.13 Pekerjaan Pemasangan Rel Pintu Dorong
G.14 Pekerjaan Pemasangan Kaca, tebal 5 mm
G.15 Pekerjaan Pemasangan Glassblock
G.16 Pekerjaan Pemasangan Pemasangan Kait Angin (Ramskar)
H Pekerjaan Atap
H.1 Pekerjaan Pembuatan dan Pemasangan Konstruksi Kuda-kuda Kayu
H.2 Pekerjaan Pembuatan dan Pemasangan Gording
H.3 Pekerjaan Pembuatan dan Pemasangan Rangka Atap Genteng Kanmuri
H.4 Pekerjaan Pembuatan dan Pemasangan Lisplank (3x20 cm)
H.5 Pekerjaan Pembuatan dan Pemasangan Lisplank (3x30 cm)
H.6 Pekerjaan Pemasangan Penutup Atap Genteng Kanmuri
I Pekerjaan Plafond
I.1 Pekerjaan Pembuatan dan Pemasangan Rangka Plafond
I.2 Pekerjaan Pengadaan dan Pemasangan Plafond Gypsumboard T=9mm
I.3 Pekerjaan Pengadaan dan Pemasangan List Plafond Gypsum
J Pekerjaan Pengecatan
J.1 Pekerjaan Pengecatan Tembok Baru
J.2 Pekerjaan Pengecatan Bidang Kayu Baru
K Pekerjaan Sanitasi
K.1 Pekerjaan Pemasangan Kloset Duduk
K.2 Pekerjaan Pemasangan Kloset Jongkok
K.3 Pekerjaan Pemasangan Washtafel
K.4 Pekerjaan Pembuatan Septic Tank
K.5 Pekerjaan Pembuatan Bak Kontrol
K.6 Pekerjaan Pemasangan Pipa
K.6.1 Pekerjaan Pemasangan Pipa PVC tipe AW d = 1/2"
K.6.2 Pekerjaan Pemasangan Pipa PVC tipe AW d = 3/4"
K.6.3 Pekerjaan Pemasangan Pipa PVC tipe AW d = 1"
K.6.4 Pekerjaan Pemasangan Pipa PVC tipe AW d = 2"
K.6.5 Pekerjaan Pemasangan Pipa PVC tipe AW d = 3"
K.6.6 Pekerjaan Pemasangan Pipa PVC tipe AW d = 4"
K.6.7 Pekerjaan Pemasangan Pipa Galvanis d = 1/2"
K.7 Pekerjaan Pemasangan Bak Cuci Piring Stainless Steel
K.8 Pekerjaan Pemasangan Kran Air diameter 3/4" atau 1/2 "
K.9 Pekerjaan Pemasangan Floor Drain
K.10 Pekerjaan Pemasangan Jetwasher
K.11 Pekerjaan Pemasangan Kran Sink
K.12 Pekerjaan Pemasangan Shower
K.13 Pekerjaan Pemasangan Bathtube
L Pekerjaan Elektikal
L.1 Pekerjaan Pemasangan Stop Kontak
L.2 Pekerjaan Pemasangan Saklar
L.3 Pekerjaan Pemasangan Lampu TL (LAMPU WASHTAFEL)
L.4 Pekerjaan Pemasangan Lampu Taman
L.5 Pekerjaan Pemasangan Panel Listrik
L.6 Pekerjaan Pemasangan Lampu Pijar
M Pekerjaan Lain-Lain
M.1 Pekerjaan Pemasangan Railing
M.2 Pekerjaan Dinding Batu Tempel
ANALISA HARGA SAT
NO URAIAN
1 2
A PEKERJAAN PERSIAPAN
A.1 Pembersihan 1 m2 Lapangan
Pekerja
Mandor
NO URAIAN
1 2
A.2 Pembuatan 1m2 Pagar Sementara dari Seng Gelombang Tinggi 1,8m
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Dolken Kayu φ 8 - 10 / 400 cm
Semen Potland
Seng Gelombang BJLS 25, Uk 90 x 180 cm
Pasir Beton
Batu Koral Beton Kali
Kayu Meranti Kaso 5/7
Paku 2" - 5"
Cat Meni Besi
JUMLAH
NO URAIAN
1 2
A.3 Pembuatan 1m2 Direksi Keet
Pekerja
Tukang Batu
Tukang Kayu
Kepala Tukang
Mandor
Dolken Kayu φ 8 - 10 / 400 cm
Kayu Meranti Papan 3/20
Besi Strip
Semen Potland
Pasir Pasang
Pasir Beton
Batu Koral Beton Kali
Bata Merah Kualitas I
Seng Gelombang BJLS 25, Uk 90 x 180 cm
Jendela Nako + Accessories
Kaca Polos tebal 3mm
Kunci Tanam
Plywood (t=4mm)
JUMLAH
NO URAIAN
1 2
A.4 Pembuatan 1m2 Los Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Dolken Kayu φ 8 - 10 / 400 cm
Kayu Meranti Papan 3/20
Paku 2" - 5"
Semen Potland
Pasir Beton
Batu Koral Beton Kali
Seng Gelombang BJLS 25, Uk 90 x 180 cm
Plywood (t=4mm)
JUMLAH
NO URAIAN
1 2
A.5 Pembuatan 1m2 Papan Nama Proyek
Pekerja
Kayu Meranti Papan 3/20
Kayu Meranti Kaso 5/7
Paku 2" - 5"
Cat SEIV Gloss Warna Strandar
JUMLAH
NO URAIAN
1 2
A.6 Pemasangan 1m' Bouwplank
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kayu Meranti Balok 6/12
Paku 2" - 3"
Kayu Meranti Papan 3/20
JUMLAH
ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN
0.1 Oh Rp 95,600.00 -
0.05 Oh Rp 131,000.00 -
JUMLAH
Harga Satuan (Rp)
URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
agar Sementara dari Seng Gelombang Tinggi 1,8m
0.2 Oh Rp 95,600.00 -
0.4 Oh Rp 109,300.00 -
0.02 Oh Rp 120,000.00 -
0.02 Oh Rp 131,000.00 -
- 10 / 400 cm 1.25 Batang - Rp 25,000.00
2.5 Kg - Rp 1,100.00
BJLS 25, Uk 90 x 180 cm 1.2 Lbr - Rp 55,000.00
0.005 m3 - Rp 250,000.00
Kali 0.009 m 3
- Rp 258,750.00
so 5/7 0.072 m3 - Rp 2,400,000.00
0.06 Kg - Rp 30,000.00
0.45 Liter - Rp 20,250.00
JUMLAH
Harga Satuan (Rp)
URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
Direksi Keet
2.000 Oh Rp 95,600.00 -
1.000 Oh Rp 109,300.00 -
2.000 Oh Rp 109,300.00 -
0.300 Oh Rp 120,000.00 -
0.050 Oh Rp 131,000.00 -
- 10 / 400 cm 1.250 Batang - Rp 25,000.00
an 3/20 0.180 m3 - Rp 3,000,000.00
1.100 Kg - Rp 56,500.00
35.000 Kg - Rp 1,100.00
0.150 m3 - Rp 224,500.00
0.100 m3 - Rp 250,000.00
Kali 0.150 m3 - Rp 258,750.00
tas I 30.000 bh - Rp 700.00
BJLS 25, Uk 90 x 180 cm 0.250 Lbr - Rp 55,000.00
ccessories 0.200 Set - Rp 395,000.00
3mm 0.080 m2 - Rp 80,000.00
0.150 bh - Rp 125,000.00
) 0.060 Lbr - Rp 58,300.00
JUMLAH
Harga Satuan (Rp)
URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
os Kerja
1 Oh Rp 95,600.00 -
2 Oh Rp 109,300.00 -
0.2 Oh Rp 120,000.00 -
0.05 Oh Rp 131,000.00 -
- 10 / 400 cm 1.25 Batang - Rp 25,000.00
an 3/20 0.186 m3 - Rp 3,000,000.00
0.3 Kg - Rp 30,000.00
18 Kg - Rp 1,100.00
0.03 m3 - Rp 250,000.00
Kali 0.05 m3 - Rp 258,750.00
BJLS 25, Uk 90 x 180 cm 0.15 Lbr - Rp 55,000.00
) 0.1 Lbr - Rp 58,300.00
JUMLAH
Harga Satuan (Rp)
URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
apan Nama Proyek
0.1 Oh Rp 95,600.00 -
an 3/20 0.18 m3 - Rp 3,000,000.00
so 5/7 0.06 m3 - Rp 2,400,000.00
0.25 Kg - Rp 30,000.00
Warna Strandar 0.1 Liter - Rp 55,000.00
JUMLAH
Harga Satuan (Rp)
URAIAN KOEF SAT
Upah Bahan
2 3 4 5 6
Bouwplank
0.1 Oh Rp 95,600.00 -
0.1 Oh Rp 109,300.00 -
0.01 Oh Rp 120,000.00 -
0.005 Oh Rp 131,000.00 -
ok 6/12 0.012 m3 - Rp 2,800,000.00
0.02 Kg - Rp 25,000.00
an 3/20 0.005 m3 - Rp 3,000,000.00
JUMLAH
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)
- Rp 9,560.00 - - Rp 9,560.00
- Rp 6,550.00 - - Rp 6,550.00
Rp 16,110.00
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)
- Rp 19,120.00 - - Rp 19,120.00
- Rp 43,720.00 - - Rp 43,720.00
- Rp 2,400.00 - - Rp 2,400.00
- Rp 2,620.00 - - Rp 2,620.00
- - Rp 31,250.00 - Rp 31,250.00
- - Rp 2,750.00 - Rp 2,750.00
- - Rp 66,000.00 - Rp 66,000.00
- - Rp 1,250.00 - Rp 1,250.00
- - Rp 2,328.75 - Rp 2,328.75
- - Rp 172,800.00 - Rp 172,800.00
- - Rp 1,800.00 - Rp 1,800.00
- - Rp 9,112.50 - Rp 9,112.50
Rp 67,860.00 Rp 287,291.25 - Rp 355,151.25
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)
- Rp 191,200.00 - - Rp 191,200.00
Rp 109,300.00 - - Rp 109,300.00
- Rp 218,600.00 - - Rp 218,600.00
- Rp 36,000.00 - - Rp 36,000.00
- Rp 6,550.00 - - Rp 6,550.00
- - Rp 31,250.000 - Rp 31,250.00
- - Rp 540,000.000 - Rp 540,000.00
- - Rp 62,150.000 - Rp 62,150.00
- - Rp 38,500.000 - Rp 38,500.00
- - Rp 33,675.000 - Rp 33,675.00
- - Rp 25,000.000 - Rp 25,000.00
- - Rp 38,812.500 Rp 38,812.50
- - Rp 21,000.000 - Rp 21,000.00
- - Rp 13,750.000 - Rp 13,750.00
- - Rp 79,000.000 Rp 79,000.00
- - Rp 6,400.000 - Rp 6,400.00
- - Rp 18,750.000 - Rp 18,750.00
- - Rp 3,498.000 - Rp 3,498.00
Rp 561,650.00 Rp 911,785.50 - Rp 1,473,435.50
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)
- Rp 95,600.00 - - Rp 95,600.00
- Rp 218,600.00 - - Rp 218,600.00
- Rp 24,000.00 - - Rp 24,000.00
- Rp 6,550.00 - - Rp 6,550.00
- - Rp 31,250.00 - Rp 31,250.00
- - Rp 558,000.00 - Rp 558,000.00
- - Rp 9,000.00 - Rp 9,000.00
- - Rp 19,800.00 - Rp 19,800.00
- - Rp 7,500.00 - Rp 7,500.00
- - Rp 12,937.50 - Rp 12,937.50
- - Rp 8,250.00 - Rp 8,250.00
- - Rp 5,830.00 - Rp 5,830.00
Rp 344,750.00 Rp 652,567.50 - Rp 997,317.50
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)
- Rp 9,560.00 - - Rp 9,560.00
- - Rp 540,000.00 - Rp 540,000.00
- - Rp 144,000.00 - Rp 144,000.00
- - Rp 7,500.00 - Rp 7,500.00
- - Rp 5,500.00 - Rp 5,500.00
Rp 9,560.00 Rp 697,000.00 - Rp 706,560.00
p) Jumlah Harga (Rp)
Jumlah (Rp)
Alat Upah Bahan Alat
7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7) 11 = ( 8+9+10)
- Rp 9,560.00 - - Rp 9,560.00
- Rp 10,930.00 - - Rp 10,930.00
- Rp 1,200.00 - - Rp 1,200.00
- Rp 655.00 - - Rp 655.00
- - Rp 33,600.00 - Rp 33,600.00
- - Rp 500.00 - Rp 500.00
- - Rp 15,000.00 - Rp 15,000.00
Rp 22,345.00 Rp 49,100.00 - Rp 71,445.00
PERHITUNGAN VOLUME PEKERJAAN PERSIAPAN
Pembersihan Lahan
Panjang = 30
A.1
Lebar = 14
Luas Tanah = 420
Pembuatan Pagar Proyek
Seng Gelombang BJLS 25, 0.9 x 1.8
Jumlah sisi = 2
A.2 Panjang (Lahan) = 14
Tinggi Seng = 1.80
Luas Seng = 50.4
Banyaknya Seng = 31.1111111111
Pembuatan 1m2 Direksi Keet
Panjang Direksi Keet = 3.5
A.3
Lebar Direksi Keet = 3.5
Luas Direksi Keet = 12.25
Pembuatan 1m2 Los Kerja
Panjang Los Kerja = 4
A.4
Lebar Los Kerja = 3
Luas Los Kerja = 12
Pembuatan 1m2 Papan Nama Proyek
Panjang Papan Proyek = 1.2
A.5
Lebar Papan Proyek = 0.6
Luas Papan Proyek = 0.72
Pembuatan 1m' Pemasangan Bouwplank
HORIZONTAL VERTIKAL
Titik AS Panjang (m') Titik AS
G1-F1 2.2 11A-10A
F1-D1 3.4 10A-9A
D1-C2 3.24 9A-8A
C2-A2 5.4 8A-7A
D3-C3 3 7A-6A
G4-F4 2.2 6A-5A
G3-F3 2.2 5A-4A
D4-C4 3 4A-3A
D5-C5 3 3A-2A
C5-A5 5.4 10B-9B
A6-B6 3 9B-7B
A7-B7 3 7B-6B
B7-C7 2.5 6B-5B
A.6
C7-E7 4.6 4C-3C
G7-E7 4 3C-2C
A8-X 2 5D-4D
A9-B9 3.15 4D-3D
E9-G9 4 3D-1D
E10-G10 4 10E-9E
A10-B10 3.15 9E-7E
A11-G11 14 4F-1F
Bouwplank P7 3 11G-10G
JUMLAH SISI 83.44 10G-9G
9G-7G
7G-5G
VOLUME BOUWBLANK (m') 5G-4G
4G-1G
Bouwplank P7
173.74 JUMLAH SISI
SIAPAN
No
m 1
m A
m2 A.1
x 1.8
m
m
No
m2
bh 1
et A.2
m
m
m2
m
m
m2
royek
m
m
m2
wplank
VERTIKAL
Panjang (m')
5
No
2
1.2 1
6.8 A.3
3
1
1.8
2.2
1.5
2
8
3
1
2.2
1.5
1.8
2.2
2
2
8
4.2
5
2
8
4
No
1.8
4.2 1
2.9 A.4
90.3
No
1
A.5
No
1
A.6
REKAPITULASI KEBUTUHAN BAHA
Pekerja 0.10 Oh
Mandor 0.05 Oh
2 3 4
Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 1,8m 28.00 m'
Pekerja 0.20 Oh
Tukang Kayu 0.40 Oh
Kepala Tukang Kayu 0.02 Oh
Mandor 0.02 Oh
Dolken Kayu φ 8 - 10 / 400 cm 1.250 Batang
Semen Potland 2.500 Kg
Seng Gelombang BJLS 25, Uk 90 x 180 cm 1.200 Lbr
Pasir Beton 0.005 m3
Batu Koral Beton Kali 0.009 m3
Kayu Meranti Kaso 5/7 0.072 m3
Paku 2" - 5" 0.060 Kg
Cat Meni Besi 0.450 Liter
2 3 4
Pembuatan 1m2 Papan Nama Proyek 0.720 m2
Pekerja 0.10 Oh
Kayu Meranti Papan 3/20 0.18 m3
Kayu Meranti Kaso 5/7 0.06 m3
Paku 2" - 5" 0.25 Kg
Cat SEIV Gloss Warna Strandar 0.10 Liter
Rp 95,600.00 - - 42 - -
Rp 131,000.00 - - 21 - -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10
Rp 95,600.00 - - 5.6 - -
Rp 109,300.00 - - 11.2 - -
Rp 120,000.00 - - 0.56 - -
Rp 131,000.00 - - 0.56 - -
- Rp 25,000.00 - - 35 -
- Rp 1,100.00 - - 70 -
- Rp 55,000.00 - - 33.6 -
- Rp 250,000.00 - - 0.14 -
- Rp 258,750.00 - - 0.252 -
- Rp 2,400,000.00 - - 2.016 -
- Rp 30,000.00 - - 1.68 -
- Rp 20,250.00 - - 12.6 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10
Rp 95,600.00 - - 24.5 - -
Rp 109,300.00 - - 12.25 - -
Rp 109,300.00 - - 24.5 - -
Rp 120,000.00 - - 3.675 - -
Rp 131,000.00 - - 0.6125 - -
- Rp 25,000.00 - - 15.3125 -
- Rp 3,000,000.00 - - 2.205 -
- Rp 56,500.00 - - 13.475 -
- Rp 1,100.00 - - 428.75 -
- Rp 224,500.00 - - 1.8375 -
- Rp 250,000.00 - - 1.225 -
- Rp 258,750.00 - - 1.8375 -
- Rp 700.00 - - 367.5 -
- Rp 55,000.00 - - 3.0625 -
- Rp 395,000.00 - - 2.45 -
- Rp 80,000.00 - - 0.98 -
- Rp 125,000.00 - - 1.8375 -
- Rp 58,300.00 - - 0.735 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10
Rp 95,600.00 - - 12 - -
Rp 109,300.00 - - 24 - -
Rp 120,000.00 - - 2.4 - -
Rp 131,000.00 - - 0.6 - -
- Rp 25,000.00 - - 15 -
- Rp 3,000,000.00 - - 2.232 -
- Rp 30,000.00 - - 3.6 -
- Rp 1,100.00 - - 216 -
- Rp 250,000.00 - - 0.36 -
- Rp 258,750.00 - - 0.6 -
- Rp 55,000.00 - - 1.8 -
- Rp 58,300.00 - - 1.2 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10
Rp 95,600.00 - - 0.072 - -
- Rp 3,000,000.00 - - 0.1296 -
- Rp 2,400,000.00 - - 0.0432 -
- Rp 30,000.00 - - 0.18 -
- Rp 55,000.00 - - 0.072 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 9 10
Rp 95,600.00 - - 17.374 - -
Rp 109,300.00 - - 17.374 - -
Rp 120,000.00 - - 1.7374 - -
Rp 131,000.00 - - 0.8687 - -
- Rp 2,800,000.00 - - 2.08488 -
- Rp 25,000.00 - - 3.4748 -
- Rp 3,000,000.00 - - 0.8687 -
Jumlah
Total
N
Rp 4,015,200.00 - -
Rp 2,751,000.00 - -
Rp 6,766,200.00
Rp 6,766,200.00
Harga Material (Rp)
Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)
Rp 535,360.00 - -
Rp 1,224,160.00 - -
Rp 67,200.00 - -
Rp 73,360.00 - -
- Rp 875,000.00 -
- Rp 77,000.00 -
- Rp 1,848,000.00 -
- Rp 35,000.00 -
- Rp 65,205.00 -
- Rp 4,838,400.00 -
- Rp 50,400.00 -
- Rp 255,150.00 -
Rp 1,900,080.00 Rp 8,044,155.00 -
Rp 9,944,235.00
Harga Material (Rp)
Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)
Rp 2,342,200.00 - -
Rp 1,338,925.00 - -
Rp 2,677,850.00 - -
Rp 441,000.00 - -
Rp 80,237.50 - -
- Rp 382,812.50 -
- Rp 6,615,000.00 -
- Rp 761,337.50 -
- Rp 471,625.00 -
- Rp 412,518.75 -
- Rp 306,250.00 -
- Rp 475,453.13 -
- Rp 257,250.00 -
- Rp 168,437.50 -
- Rp 967,750.00 -
- Rp 78,400.00 -
- Rp 229,687.50 -
- Rp 42,850.50 -
Rp 6,880,212.50 Rp 11,169,372.38
Rp 18,049,584.88
Harga Material (Rp)
Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)
Rp 1,147,200.00 - -
Rp 2,623,200.00 - -
Rp 288,000.00 - -
Rp 78,600.00 - -
- Rp 375,000.00 -
- Rp 6,696,000.00 -
- Rp 108,000.00 -
- Rp 237,600.00 -
- Rp 90,000.00 -
- Rp 155,250.00 -
- Rp 99,000.00 -
- Rp 69,960.00 -
Rp 4,137,000.00 Rp 7,830,810.00 -
Rp 11,967,810.00
Harga Material (Rp)
Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)
Rp 6,883.20 - -
- Rp 388,800.00 -
- Rp 103,680.00 -
- Rp 5,400.00 -
- Rp 3,960.00 -
Rp 6,883.20 Rp 501,840.00 -
Rp 508,723.20
Harga Material (Rp)
Upah Bahan Alat
11 = (5 X 8) 12 = (6 X 9) 13 = (7 X 10)
Rp 1,660,954.40 - -
Rp 1,898,978.20 - -
Rp 208,488.00 - -
Rp 113,799.70 - -
- Rp 5,837,664.00 -
- Rp 86,870.00 -
- Rp 2,606,100.00 -
Rp 3,882,220.30 Rp 8,530,634.00 -
Rp 12,412,854.30
REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJA
HARGA SATUAN
NO URUTAN PEKERJAAN VOL SAT
UPAH
1 2 3 4 5
A.1 Pembersihan Lapangan 420.000 m2 Rp 16,110.00
A.2 Pembuatan Pagar Sementara 28.000 m' Rp 67,860.00
A.3 Pembuatan Direksi Keet 12.250 m2 Rp 561,650.00
A.4 Pembuatan Los Kerja 12.000 m2 Rp 344,750.00
A.5 Pembuatan Papan Nama Proyek 0.720 m2
Rp 9,560.00
A.6 Pemasangan Bouwplank 173.740 m' Rp 22,345.00
Total Anggaran Biaya
NO URAIAN
1 2
B PEKERJAAN TANAH
B.1 Penggalian 1 m3 Tanah Biasa Sedalam 1 m
Pekerja
Mandor
Pekerja
Mandor
REN
NO URUTUAN PEKERJAAN
1 2
B PEKERJAAN TANAH
B.1 Penggalian Tanah Biasa Sedalam 1 m
B.2 Pengurugan dengan Tanah Urug
REKAPITULA
0.750 Oh Rp 95,600.00 - -
0.025 Oh Rp 131,000.00 - -
JUMLAH
0.50 Oh Rp 95,600.00 - -
0.05 Oh Rp 131,000.00 - -
JUMLAH
149.66 m3 Rp 74,975.00 - -
47.53 m3 Rp 54,350.00 - -
TOTAL
Rp 71,700.00 - - Rp 71,700.00
Rp 3,275.00 - - Rp 3,275.00
Rp 74,975.00
Rp 47,800.00 - - Rp 47,800.00
Rp 6,550.00 - - Rp 6,550.00
Rp 54,350.00
Rp 11,220,413.43 - - Rp 11,220,413.43
Rp 2,583,301.65 - - Rp 2,583,301.65
Rp 13,803,715.08 - - Rp 13,803,715.08
N TANAH
REKAPITULASI KEBUTUHAN BAHAN DAN TENA
1 2 3 4
B.2 Pengurungan Kembali 1 m3 Galian Tanah 47.53 m3
Pekerja 0.500 Oh
Mandor 0.050 Oh
Pondasi P6
Panjang = 6.5 m
Lebar = 0.8 m
Tinggi = 1.1 m
Luas Galian = 0.88 m2
Volume Galian = 5.72 m3
PERHITUNGAN VOLUME PEKERJAAN TANAH
Tie Beam 5A
Panjang
Lebar
Tinggi
Luas Galian
Volume Galian
Tie Beam 1
= 5.4 m
= 0.15 m
= 0.2 m
= 0.03 m2
= 0.16 m3
Tie Beam 3A
= 13.83 m
= 0.150 m
= 0.300 m
= 0.045 m2
= 0.622 m3
Tie Beam 4
= 8.6 m
= 0.150 m
= 0.350 m
= 0.053 m2
= 0.452 m3
Tie Beam 5A
= 17.100 m
= 0.200 m
= 0.350 m
= 0.070 m2
= 1.197 m3
PERHITUNGAN PANJANG P
Tie Beam 2B
= 3.4 m
= 3 m
= 3 m
= 5.4 m
= 8 m
= 22.8 m
Tie Beam 3A
= 5.4 m
= 1.5 m
= 4 m
= 2.93 m
= 13.83 m
Harga Satuan (Rp)
NO URAIAN KOEF SAT
Upah
1 2 3 4 5
C PEKERJA
C.1 Pondasi Batu Kali
C.1.1 1 m3 Pondasi Batu Belah 1 SP : 4 PP
Pekerja 1.5 Oh Rp 95,600.00
Tukang Batu 0.75 Oh Rp 109,300.00
Kepala Tukang Batu 0.075 Oh Rp 120,000.00
Mandor 0.075 Oh Rp 131,000.00
Batu Belah 1.2 m3 -
Semen Portland 163 Kg -
Pasir Pasang 0.52 m3 -
JUMLAH
C.1.2 1 m3 Beton Mutu K225
Pekerja 1.65 Oh Rp 95,600.00
Tukang Batu 0.275 Oh Rp 109,300.00
Kepala Tukang Batu 0.028 Oh Rp 120,000.00
Mandor 0.08 Oh Rp 131,000.00
Semen Portland 384.00 Kg -
Koral Beton 0.4943 m3 -
Pasir Beton 0.7696 m 3
-
JUMLAH
C.1.3 Pembesian 1 Kg dengan Besi Polos
Pekerja 0.007 Oh Rp 95,600.00
Tukang Besi 0.007 Oh Rp 109,300.00
Kepala Tukang Besi 0.0007 Oh Rp 120,000.00
Mandor 0.0004 Oh Rp 131,000.00
Besi Beton Polos 1.05 Kg -
Kawat Beton 0.015 Kg -
JUMLAH
6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)
PEKERJAAN PONDASI
- - Rp 143,400.00 - -
- - Rp 81,975.00 - -
- - Rp 9,000.00 - -
- - Rp 9,825.00 - -
Rp 258,750.00 - - Rp 310,500.00 -
Rp 1,100.00 - - Rp 179,300.00 -
Rp 224,500.00 - - Rp 116,740.00 -
Rp 244,200.00 Rp 606,540.00 -
- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 422,400.00 -
Rp 148,100.00 - - Rp 73,205.83 -
Rp 250,000.00 - - Rp 192,400.00 -
Rp 202,030.50 Rp 688,005.83 -
- - Rp 669.20 - -
- - Rp 765.10 - -
- - Rp 84.00 - -
- - Rp 52.40 - -
Rp 9,500.00 - - Rp 9,975.00 -
Rp 25,000.00 - - Rp 375.00 -
Rp 1,570.70 Rp 10,350.00 -
- - Rp 49,712.000 - -
- - Rp 28,418.000 - -
- - Rp 3,120.000 - -
- - Rp 3,406.000 - -
Rp 3,000,000.00 - - Rp 120,000.000 -
Rp 15,000.00 - - Rp 4,500.000 -
Rp 16,500.00 - - Rp 1,650.000 -
Rp 84,656.000 Rp 126,150.000 -
ANALISA HARGA SATUAN PEKERJAAN PONDASI
11 = ( 8+9+10) 1 2 3 4
Rp 669.20 1 2 3 4
Rp 765.10 C.3 Pondasi Strauss Pile (Kedalaman 6m)
Rp 84.00 C.3.1 Pemasangan Pile Cap
Rp 52.40 C.3.1.1 1 m3 Pekejraan Lantai Kerja 1 PC : 3 PS : 5 KRL
Rp 9,975.00 Pekerja 2 Oh
Rp 375.00 Tukang Batu 0.5 Oh
Rp 11,920.70 Kepala Tukang Batu 0.05 Oh
Mandor 0.01 Oh
Rp 49,712.000 PC (50 kg) 3.956 zak
Rp 28,418.000 Pasir Beton 0.55 m3
Rp 3,120.000 Split Pecah Mesin 2/3 0.93 m3
Rp 3,406.000 JUMLAH
Rp 120,000.000 C.3.1.2 Membuat 1 m3 Beton Mutu K225
Rp 4,500.000 Pekerja 1.65 Oh
Rp 1,650.000 Tukang Batu 0.275 Oh
Rp 210,806.000 Kepala Tukang Batu 0.028 Oh
Mandor 0.08 Oh
Semen Portland 384.00 Kg
Koral Beton 0.4943 m3
Pasir Beton 0.7696 m3
JUMLAH
C.3.1.3 Pembesian 1 Kg dengan Besi Ulir
Pekerja 0.007 Oh
Tukang Besi 0.007 Oh
Kepala Tukang Besi 0.0007 Oh
Mandor 0.0004 Oh
Besi Beton Ulir 1.05 Kg
Kawat Beton 0.015 Kg
JUMLAH
C.3.1.4 Pemasangan 1m2 Bekisting Untuk Pile Cap
Pekerja 0.520 Oh
Tukang Kayu 0.260 Oh
Kepala Tukang Kayu 0.026 Oh
Mandor 0.026 Oh
Kayu Meranti Papan 0.040 m3
Paku 8-12 cm 0.300 Kg
0.100 Liter
Minyak Bekisting
JUMLAH
C.3.2 Pemasangan Strauss Pile (Kedalaman 6m)
C.3.2.1 Membuat 1 m3 Beton Mutu K225
Pekerja 1.65 Oh
Tukang Batu 0.275 Oh
Kepala Tukang Batu 0.028 Oh
Mandor 0.08 Oh
Semen Portland 384.00 Kg
Koral Beton 0.4943 m3
Pasir Beton 0.7696 m3
JUMLAH
C.3.2.2 Pembesian 1 Kg dengan Besi Polos
Pekerja 0.007 Oh
Tukang Besi 0.007 Oh
Kepala Tukang Besi 0.0007 Oh
Mandor 0.0004 Oh
Besi Beton Polos 1.05 Kg
Kawat Beton 0.015 Kg
JUMLAH
Harga Satuan (Rp) Jumlah Harga (Rp)
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)
PP
Rp 95,600.00 - - Rp 57,360.00 - -
Rp 109,300.00 - - Rp 21,860.00 - -
Rp 120,000.00 - - Rp 2,400.00 - -
Rp 131,000.00 - - Rp 3,930.00 - -
- Rp 700.00 - Rp 98,000.00
- Rp 1,100.00 - - Rp 29,205.00 -
- Rp 224,500.00 - - Rp 20,205.00 -
JUMLAH Rp 85,550.00 Rp 147,410.00 -
Rp 95,600.00 - - Rp 38,240.00 - -
Rp 109,300.00 - - Rp 21,860.00 - -
Rp 120,000.00 - - Rp 2,400.00 - -
Rp 131,000.00 - - Rp 2,882.00 - -
- Rp 1,100.00 - - Rp 9,152.00 -
- Rp 224,500.00 - - Rp 7,184.00 -
JUMLAH Rp 65,382.00 Rp 16,336.00 -
PS : 5 KRL
Rp 95,600.00 - - Rp 191,200.00 - -
Rp 109,300.00 - - Rp 54,650.00 - -
Rp 120,000.00 - - Rp 6,000.00 - -
Rp 131,000.00 - - Rp 1,310.00 - -
- Rp 53,000.00 - - Rp 209,668.00 -
- Rp 250,000.00 - - Rp 137,500.00 -
- Rp 195,120.00 - - Rp 181,461.60 -
JUMLAH Rp 253,160.00 Rp 528,629.60 -
Rp 95,600.00 - - Rp 157,740.00 - -
Rp 109,300.00 - - Rp 30,057.50 - -
Rp 120,000.00 - - Rp 3,360.00 - -
Rp 131,000.00 - - Rp 10,873.00 - -
- Rp 1,100.00 - - Rp 422,400.00 -
- Rp 148,100.00 - - Rp 73,205.83 -
- Rp 250,000.00 - - Rp 192,400.00 -
JUMLAH Rp 202,030.50 Rp 688,005.83 -
Rp 95,600.00 - - Rp 669.20 - -
Rp 109,300.00 - - Rp 765.10 - -
Rp 120,000.00 - - Rp 84.00 - -
Rp 131,000.00 - - Rp 52.40 - -
- Rp 11,425.00 - - Rp 11,996.25 -
- Rp 25,000.00 - - Rp 375.00 -
JUMLAH Rp 1,570.70 Rp 12,371.25 -
e Cap
Rp 95,600.00 - - Rp 49,712.000 - -
Rp 109,300.00 - - Rp 28,418.000 - -
Rp 120,000.00 - - Rp 3,120.000 - -
Rp 131,000.00 - - Rp 3,406.000 - -
- Rp 3,000,000.00 - - Rp 120,000.000 -
- Rp 15,000.00 - - Rp 4,500.000 -
- Rp 16,500.00 - - Rp 1,650.000 -
JUMLAH Rp 84,656.000 Rp 126,150.000 -
6m)
Rp 95,600.00 - - Rp 157,740.00 - -
Rp 109,300.00 - - Rp 30,057.50 - -
Rp 120,000.00 - - Rp 3,360.00 - -
Rp 131,000.00 - - Rp 10,873.00 - -
- Rp 1,100.00 - - Rp 422,400.00 -
- Rp 148,100.00 - - Rp 73,205.83 -
- Rp 250,000.00 - - Rp 192,400.00 -
JUMLAH Rp 202,030.50 Rp 688,005.83 -
Rp 95,600.00 - - Rp 669.20 - -
Rp 109,300.00 - - Rp 765.10 - -
Rp 120,000.00 - - Rp 84.00 - -
Rp 131,000.00 - - Rp 52.40 - -
- Rp 9,500.00 - - Rp 9,975.00 -
- Rp 25,000.00 - - Rp 375.00 -
JUMLAH Rp 1,570.70 Rp 10,350.00 -
Jumlah (Rp) No Uraian Pekerjaan
11 = ( 8+9+10) 1 2
C
C.1 Pondasi Batu Kali
Rp 57,360.00 C.1.1 1 m3 Pondasi Batu Belah 1 SP : 4 PP
Rp 21,860.00 Pekerja
Rp 2,400.00 Tukang Batu
Rp 3,930.00 Kepala Tukang Batu
Rp 98,000.00 Mandor
Rp 29,205.00 Batu Belah
Rp 20,205.00 Semen Portland
Rp 232,960.00 Pasir Pasang
Rp 38,240.00
Rp 21,860.00
No Uraian Pekerjaan
Rp 2,400.00
Rp 2,882.00 1 2
Rp 9,152.00 C.1.2 1 m3 Beton Mutu K225
Rp 7,184.00 Pekerja
Rp 81,718.00 Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah (Rp)
Semen Portland
11 = ( 8+9+10) Koral Beton
Pasir Beton
Rp 191,200.00
No Uraian Pekerjaan
Rp 54,650.00
Rp 6,000.00 1 2
Rp 1,310.00
C.1.3 Pembesian 1 Kg dengan Besi Polos
Rp 209,668.00 Pekerja
Rp 137,500.00 Tukang Besi
Rp 181,461.60 Kepala Tukang Besi
Rp 781,789.60 Mandor
Besi Beton Polos
Rp 157,740.00 Kawat Beton
Rp 30,057.50
Rp 3,360.00
Rp 10,873.00
No Uraian Pekerjaan
Rp 422,400.00
Rp 73,205.83 1 2
Rp 192,400.00 C.1.4 Pemasangan 1 m2 Bekisting
Rp 890,036.33 Pekerja
Tukang Kayu
Rp 669.20 Kepala Tukang Kayu
Rp 765.10 Mandor
Rp 84.00 Kayu Meranti Papan
Rp 52.40 Paku 8-12 cm
Rp 11,996.25 Minyak Bekisting
Rp 375.00
Rp 13,941.95
Rp 49,712.000
Rp 28,418.000
Rp 3,120.000
Rp 3,406.000
Rp 120,000.000
Rp 4,500.000
Rp 1,650.000
Rp 210,806.000
Rp 157,740.00
Rp 30,057.50
Rp 3,360.00
Rp 10,873.00
Rp 422,400.00
Rp 73,205.83
Rp 192,400.00
Rp 890,036.33
Rp 669.20
Rp 765.10
Rp 84.00
Rp 52.40
Rp 9,975.00
Rp 375.00
Rp 11,920.70
Harga Satuan (Rp) Jumlah yang Dibutu
Vol Koef Satuan
Upah Bahan Alat Upah
3 4 5 6 7 8 9 = (3 x 4)
PEKERJAAN PONDASI
64.72 - m3
1.5 Oh Rp 95,600.00 - - 97.08
0.75 Oh Rp 109,300.00 - - 48.54
0.075 Oh Rp 120,000.00 - - 4.854
0.075 Oh Rp 131,000.00 - - 4.854
1.2 m3 - Rp 258,750.00 - -
163 Kg - Rp 1,100.00 - -
0.52 m3 - Rp 224,500.00 - -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutu
Vol Koef Satuan
Upah Bahan Alat Upah
3 4 5 6 7 8 9 = (3 x 4)
18.234 - m3
1.65 Oh Rp 95,600.00 - - 30.0861
0.275 Oh Rp 109,300.00 - - 5.01435
0.028 Oh Rp 120,000.00 - - 0.510552
0.08 Oh Rp 131,000.00 - - 1.513422
384.00 Kg - Rp 1,100.00 - -
0.4943 m3 - Rp 148,100.00 - -
0.7696 m3
- Rp 250,000.00 - -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutu
Vol Koef Satuan
Upah Bahan Alat Upah
3 4 5 6 7 8 9 = (3 x 4)
330.751 - Kg
0.007 Oh Rp 95,600.00 - - 2.31525616
0.007 Oh Rp 109,300.00 - - 2.31525616
0.0007 Oh Rp 120,000.00 - - 0.23152562
0.0004 Oh Rp 131,000.00 - - 0.13230035
1.05 Kg - Rp 9,500.00 - -
0.015 Kg - Rp 25,000.00 - -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutu
Vol Koef Satuan
Upah Bahan Alat Upah
3 4 5 6 7 8 9 = (3 x 4)
16.8 - m2
0.520 Oh Rp 95,600.00 - - 8.736
0.260 Oh Rp 109,300.00 - - 4.368
0.026 Oh Rp 120,000.00 - - 0.4368
0.026 Oh Rp 131,000.00 - - 0.4368
0.040 m3 - Rp 3,000,000.00 - -
0.300 Kg - Rp 15,000.00 - -
0.100 Liter - Rp 16,500.00 - -
Jumlah
Total
KEBUTUHAN BAHAN DAN UPA
10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- - Rp 9,280,848.00 - -
- - Rp 5,305,422.00 - -
- - Rp 582,480.00 - -
- - Rp 635,874.00 - -
77.664 - - Rp 20,095,560.00 -
10549.36 - - Rp 11,604,296.00 -
33.6544 - - Rp 7,555,412.80 -
Jumlah Rp 15,804,624.00 Rp 39,255,268.80 -
Total Rp 55,059,892.80
Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat
10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- - Rp 2,876,231.16 - -
- - Rp 548,068.46 - -
- - Rp 61,266.24 - -
- - Rp 198,258.28 - -
7001.856 - - Rp 7,702,041.60 -
9.0130662 - - Rp 1,334,835.10 -
14.0328864 - - Rp 3,508,221.60 -
Jumlah Rp 3,683,824.14 Rp 12,545,098.30 -
Total Rp 16,228,922.44
Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat
10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- - Rp 221,338.49 - -
- - Rp 253,057.50 - -
- - Rp 27,783.07 - -
- - Rp 17,331.35 - -
347.288424 - - Rp 3,299,240.03 -
4.9612632 - - Rp 124,031.58 -
Jumlah Rp 519,510.41 Rp 3,423,271.61 -
Total Rp 3,942,782.02
Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat
10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- - Rp 835,161.60 - -
- - Rp 477,422.40 - -
- - Rp 52,416.00 - -
- - Rp 57,220.80 - -
0.672 - - Rp 2,016,000.00 -
5.04 - - Rp 75,600.00 -
1.68 - - Rp 27,720.00 -
Jumlah Rp 1,422,220.80 Rp 2,119,320.00 -
Total Rp 3,541,540.80
HAN BAHAN DAN UPAH PEKERJAAN PONDASI
1 2 3
1 2 3
C.3 Pondasi Strauss Pile (Kedalaman 6m)
C.3.1
Pemasangan Pile Cap
C.3.1.1 1 m3 Pekejraan Lantai Kerja 1 PC : 3 PS : 5 KRL 0.2364
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
PC (50 kg)
Pasir Beton
Split Pecah Mesin 2/3
Tukang Besi
1 2 3
C.3.1.4 Pemasangan 1m2 Bekisting 3.4
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Meranti Papan
Paku 8-12 cm
Minyak Bekisting
4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)
- m2
0.60 Oh Rp 95,600.00 - - 4.1652 -
0.20 Oh Rp 109,300.00 - - 1.3884 -
0.02 Oh Rp 120,000.00 - - 0.13884 -
0.03 Oh Rp 131,000.00 - - 0.20826 -
140 Buah - Rp 700.00 - - 971.88
26.55 Kg - Rp 1,100.00 - - 184.3101
0.09 m3 - Rp 224,500.00 - - 0.62478
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Koef Satuan
Upah Bahan Alat Upah Bahan
4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)
- m2
0.4 Oh Rp 95,600.00 - - 0 -
0.2 Oh Rp 109,300.00 - - 0 -
0.02 Oh Rp 120,000.00 - - 0 -
0.022 Oh Rp 131,000.00 - - 0 -
8.32 Kg - Rp 1,100.00 - - 0
0.032 m3 - Rp 224,500.00 - - 0
Jumlah
Total
- m3
1.65 Oh Rp 95,600.00 - - 20.003445 -
0.275 Oh Rp 109,300.00 - - 3.3339075 -
0.028 Oh Rp 120,000.00 - - 0.3394524 -
0.08 Oh Rp 131,000.00 - - 1.0062339 -
384.00 Kg - Rp 1,100.00 - - 4655.3472
0.4943 m3 - Rp 148,100.00 - - 5.99254719
0.7696 m3 - Rp 250,000.00 - - 9.33009168
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Koef Satuan
Upah Bahan Alat Upah Bahan
4 5 6 7 8 9 = (3 x 4) 10 = (3 x 4)
- Kg
0.007 Oh Rp 95,600.00 - - 7.22241135 -
0.007 Oh Rp 109,300.00 - - 7.22241135 -
0.0007 Oh Rp 120,000.00 - - 0.722241135 -
0.0004 Oh Rp 131,000.00 - - 0.41270922 -
1.05 Kg - Rp 9,500.00 - - 1083.3617025
0.015 Kg - Rp 25,000.00 - - 15.47659575
Jumlah
Total
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- Rp 398,193.12 - -
- Rp 151,752.12 - -
- Rp 16,660.80 - -
- Rp 27,282.06 - -
- - Rp 680,316.00 -
- - Rp 202,741.11 -
- - Rp 140,263.11 -
lah Rp 593,888.10 Rp 1,023,320.22 -
tal Rp 1,617,208.32
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- Rp - - -
- Rp - - -
- Rp - - -
- Rp - - -
- - Rp - -
- - Rp - -
lah Rp - Rp - -
tal Rp -
- Rp 488,994.00 - -
- Rp 93,178.25 - -
- Rp 10,416.00 - -
- Rp 33,706.30 - -
- - Rp 1,309,440.00 -
- - Rp 226,938.07 -
- - Rp 596,440.00 -
lah Rp 626,294.55 Rp 2,132,818.07 -
tal Rp 2,759,112.62
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- Rp 194,965.00 - -
- Rp 222,904.54 - -
- Rp 24,472.59 - -
- Rp 15,266.24 - -
- - Rp 3,494,992.27 -
- - Rp 109,252.65 -
lah Rp 457,608.37 Rp 3,604,244.92 Rp -
tal Rp 4,061,853.29
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- Rp 169,020.80 - -
- Rp 96,621.20 - -
- Rp 10,608.00 - -
- Rp 11,580.40 - -
- - Rp 408,000.00 -
- - Rp 15,300.00 -
- - Rp 5,610.00 -
lah Rp 287,830.40 Rp 428,910.00 Rp -
tal Rp 716,740.40
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- Rp 1,912,329.34 - -
- Rp 364,396.09 - -
- Rp 40,734.29 - -
- Rp 131,816.64 - -
- - Rp 5,120,881.92 -
- - Rp 887,496.24 -
- - Rp 2,332,522.92 -
lah Rp 2,449,276.36 Rp 8,340,901.08 Rp -
tal Rp 10,790,177.44
ang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat
11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
- Rp 690,462.53 - -
- Rp 789,409.56 - -
- Rp 86,668.94 - -
- Rp 54,064.91 - -
- - Rp 10,291,936.17 -
- - Rp 386,914.89 -
lah Rp 1,620,605.93 Rp 10,678,851.07 Rp -
tal Rp 12,299,457.00
No Detail Pondasi
Pondasi Batu Kali Tipe 1
Lebar Atas = 0.8 m
= 1.6 m
Lebar Bawah
Tinggi = 0.8 m
1 Panjang = 20 m
Luas = 0.96 m2
Volume = 19.2 m3
No Detail Pondasi
Pondasi Batu Kali Tipe 2
Lebar Atas = 0.4 m
Lebar Bawah = 0.8 m
Tinggi = 0.8 m
Panjang = 27.15 m
2
Luas = 0.48 m2
Volume = 13.032 m3
No Detail Pondasi
Pondasi Batu Kali Tipe 3
Lebar Atas = 0.8 m
Lebar Bawah = 1.6 m
Tinggi = 0.8 m
Panjang = 26.5 m
3 Luas = 0.96 m2
Volume = 25.44 m3
No Detail Pondasi
Pondasi Batu Kali Tipe 4
Lebar Atas = 0.4 m
Lebar Bawah = 0.8 m
Tinggi = 0.8 m
Panjang = 10.35 m
4
Luas = 0.48 m2
Volume = 4.968 m3
No Detail Pondasi
Pondasi Batu Kali Tipe 7
Panjang = 6.5 m
Lebar = 0.8 m
Tinggi = 0.4 m
Luas = 0.32 m2
5
Volume = 2.08 m3
1 Lebar = 1.8 m
Tinggi = 0.1 m
Luas = 4 m2
Detail Perhitungan Volume Bekisting
No
Pondasi Batu Kali P3
Panjang = 26.5 m
Lebar = 1.8 m
3 Tinggi = 0.1 m
Luas = 5.3 m2
TOTAL VOLUME
PERHITUNGAN VOLUME PEKERJAAN PONDASI
Detail Pondasi
Pondasi P1 (Batu Kali)
7A-10A = 10 m
7G-10G = 10 m
Total = 20 m
Pondasi P2 (Batu Kali)
7B-10B = 10 m
7E-10E = 10 m
10E-10G = 4 m
10A-10B = 3.15 m
Total = 27.15 m
Detail Pondasi Pondasi P3 (Batu Kali)
11A-11G = 14 m
2A-1'A = 2.5 m
10A-11A = 5 m
10G-11G = 5 m
Total = 26.5 m
Pondasi P4 (Batu Kali)
9E-9G = 4 m
9A-9B = 3.15 m
9A'-9B' = 1.2 m
8A-A' = 2 m
Detail Pondasi Total = 10.35 m
Pondasi P5 (Pondasi Teras)
B7'-E7' = 6.85 m
1'C-1"C = 3.5 m
1'D-1"D = 3 m
Total = 13.35 m
Pondasi P7
1"D - 1"C = 3 m
1"D-1"D = 3.5 m
Total = 6.5 m
Detail Pondasi
Detail Pondasi
2 Lebar = 1 m
Tinggi = 0.1 m
Luas = 5.43 m2
Detail Perhitungan Volume Bekisting
No
Pondasi Batu Kali P4
Panjang = 10.35 m
Lebar = 1 m
4 Tinggi = 0.1 m
Luas = 2.07 m2
LUME 16.8 m2
NDASI
= 20 m
Panjang
1 = 1.8 m
Lebar
Tinggi = 0.1 m
Luas = 0.18 m2
Volume = 3.6 m3
No Detail Plat Beton
Pondasi Batu Kali Tipe 2
Panjang = 27.15 m
Lebar = 1 m
2
Tinggi = 0.1 m
Luas = 0.1 m2
Volume = 2.715 m3
No Detail Plat Beton
Pondasi Batu Kali Tipe 3
Panjang = 26.5 m
Lebar = 1.8 m
3 Tinggi = 0.1 m
Luas = 0.18 m2
Volume = 4.77 m3
No Detail Plat Beton
Pondasi Batu Kali Tipe 4
Panjang = 10.35 m
Lebar = 1 m
4
Tinggi = 0.1 m
Luas = 0.1 m2
Volume = 1.035 m3
Volume = 1.813 m3
Volume = 2.402 m3
Volume = 0.524 m3
4
1 P1 (Batu Kali)
2 P2 (Batu Kali)
3 P3 (Batu Kali)
4 P4(Batu Kali)
No Tipe Pondasi
1 P1 (Batu Kali)
2 P2 (Batu Kali)
3 P3 (Batu Kali)
4 P4 (Batu Kali)
TOTAL VOLUME TULANG
Detail Penulangan P
Panjang Tulangan
Tulangan Panjang Bentang (m)
(m)
20 1.792
27.15 1
26.5 1.792
10.35 1
20 6
27.15 4
26.5 6
10.35 4
TOTAL VOLUME TULANGAN 2
Detail Penulangan Plat Beton
ME TULANGAN 1
0.395 47.4
0.395 42.897
0.395 62.805
0.395 16.353
169.455
No
0.395 47.897
1
0.395 36.143
0.395 63.234
0.395 14.023
161.296
2
3
TOTAL
Lantai Kerja
Strauss P1
Strauss P1
D,4C,4D,4F,3C,2C,1D,1F
Strauss P2
Panjang Pile Cap = 0.8 m
Lebar Pile Cap = 0.5 m
Tinggi Pile Cap = 0.5 m
Luas Pile Cap = 0.4 m2
2
Jumlah Pile Cap = 8 Buah
Volume Pile Cap = 1.600 m3
A,5G,4A,4G,3A,1G
Strauss P2A
Panjang Pile Cap = 0.8 m
Lebar Pile Cap = 0.5 m
Tinggi Pile Cap = 0.5 m
Luas Pile Cap = 0.4 m2
3 Jumlah Pile Cap = 2 Buah
Volume Pile Cap = 0.400 m3
a : 7A, 7G
TOTAL VOLUME (m3)
PILE CAP
No Posisi
1 A
2 B
3 C
2 B
3 C
4 D
No Posisi
1 A
2 B
3 C
3 C
4 D
TOT
Detail Penulangan Pile Cap 1
Panjang
Tulangan Panjang Bentang (m) Jumlah
Tulangan (m)
Panjang = 0.5 m
1.04 2.221 Lebar = 0.5 m
1
Tinggi = 0.4 m
Luas = 0.8 m2
1.04 2.081 Detail Perhitungan Volume Bekisting
No
Pile Cap 2A
Panjang = 0.8 m
Lebar = 0.5 m
3
Tinggi = 0.5 m
Luas = 1.3 m2
1.04 2.278
TOTAL VOLUME
No DETAIL PONDASI
1.04 2.140
8.720
1
95.9244
2
Berat Tulangan (kg/m') Volume (Kg)
1.04 6.725
1.04 6.435
1.04 3.092
1.04 3.290
19.542
156.3328
A
Berat Tulangan (kg/m') Volume (Kg)
1.04 6.725
1.04 6.435
1.04 3.092
1.04 3.092
1.04 3.290
19.542
39.0832
A) 291.3404
Detail Perhitungan Volume Bekisting
No
Pile Cap 2
Panjang = 0.8 m
Lebar = 0.5 m
2
Tinggi = 0.5 m
Luas = 1.3 m2
AL VOLUME 3.4 m2
Diameter (m) Kedalaman (m) Jumlah Volume (m3) Volume Total (m3)
TOTAL
Penulangan Pondasi Strauss
1031.773
REKAPITULASI RENCANA
1 2 3
C
C.1 Pondasi Batu Kali
1 m3 Pondasi Batu Belah 1 SP : 4 PP 64.72
1 m3 Beton Mutu K225 18.234
Pembesian 1 Kg dengan Besi Polos 330.751
Pemasangan 1m2 Bekisting 16.8
C.2 Pondasi Rollag Bata
Pemasangan 1m2 Bata Merah 1 SP : 4 PP 6.942
C.3 Pondasi Strauss Pile (Kedalaman 6m)
C.3.1 Pemasangan Pile Cap
1 m3 Pekejraan Lantai Kerja 1 PC : 3 PS : 5 KRL 0.2364
Membuat 1 m3 Beton Mutu K225 3.1000
Pembesian 1 Kg dengan Besi Ulir 291.3404
Pemasangan 1m2 Bekisting Untuk Pile Cap 3.4
C.3.2 Pemasangan Strauss Pile (Kedalaman 6m)
Membuat 1 m3 Beton Mutu K225 12.1233
Pembesian 1 Kg dengan Besi Polos 1031.773
TOTAL
No Tenaga Kerja Satuan
1 2 3
1 Pekerja Oh
2 Tukang Batu Oh
3 Tukang Besi Oh
4 Tukang Kayu Oh
5 Kepala Tukang Batu Oh
6 Kepala Tukang Besi Oh
7 Kepala Tukang Kayu Oh
8 Mandor Oh
TOTAL
No Bahan Satuan
1 2 3
1 Batu Belah Pondasi m3
2 Semen Portland kg
3 Pasir Pasang m3
4 Koral Beton m3
5 Pasir Beton m3
6 Besi Beton Polos kg
7 Kawat Beton kg
8 Kayu Meranti Papan m3
9 Paku 8-12 cm kg
10 Minyak Bekisting Ltr
11 Batu Bata Merah Buah
12 PC (50Kg) zak
13 Split Pecah Mesin 2/3 m3
14 Besi Beton Ulir kg
TOTAL
PITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PONDASI
L Rp 27,525,539.57
Satuan Jumlah Kebutuhan Harga Satuan (Rp) Biaya Upah
3 4 5 6 = (4 x 5)
Oh 179.00 Rp 95,600.00 Rp 17,112,750.88
Oh 59.25 Rp 109,300.00 Rp 6,475,738.22
Oh 11.58 Rp 109,300.00 Rp 1,265,371.60
Oh 5.25 Rp 109,300.00 Rp 574,043.60
Oh 5.94 Rp 120,000.00 Rp 712,975.95
Oh 1.16 Rp 120,000.00 Rp 138,924.60
Oh 0.53 Rp 120,000.00 Rp 63,024.00
Oh 9.03 Rp 131,000.00 Rp 1,182,710.71
L Rp 27,525,539.57
L Rp 83,676,991.94
JUMLAH HARGA TOTAL HARGA
BAHAN (UPAH+BAHAN)
8 = (3x6) 9 = (7+8)
Rp 39,255,268.80 Rp 55,059,892.80
Rp 12,545,098.30 Rp 16,228,922.44
Rp 3,423,271.61 Rp 3,942,782.02
Rp 2,119,320.00 Rp 3,541,540.80
Rp 1,023,320.22 Rp 1,617,208.32
Rp 124,987.86 Rp 184,844.38
Rp 2,132,818.07 Rp 2,759,112.62
Rp 3,604,244.92 Rp 4,061,853.29
Rp 428,910.00 Rp 716,740.40
Rp 8,340,901.08 Rp 10,790,177.44
Rp 10,678,851.07 Rp 12,299,457.00
Rp 83,676,991.94 Rp 111,202,531.50
ANALISA HARGA SATUAN P
- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -
- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 11,425.00 - - Rp 119,962.50 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 123,712.50 -
- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -
- - Rp 49,712.00 - -
- - Rp 28,418.00 - -
- - Rp 3,120.00 - -
- - Rp 3,406.00 - -
Rp 1,815,000.00 - - Rp 81,675.00 -
Rp 15,000.00 - - Rp 4,500.00 -
Rp 16,500.00 - - Rp 1,650.00 -
Rp 84,656.00 Rp 87,825.00 -
- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -
- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 11,425.00 - - Rp 119,962.50 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 123,712.50 -
- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -
- - Rp 63,096.00 - -
- - Rp 36,069.00 - -
- - Rp 3,960.00 - -
- - Rp 4,323.00 - -
Rp 1,815,000.00 - - Rp 72,600.00 -
Rp 15,000.00 - - Rp 4,500.00 -
Rp 16,500.00 - - Rp 1,650.00 -
Rp 1,705,000.00 - - Rp 25,575.00 -
Rp 111,000.00 - - Rp 38,850.00 -
Rp 25,000.00 - - Rp 50,000.00 -
Rp 107,448.00 Rp 193,175.00 -
- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -
- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 11,425.00 - - Rp 119,962.50 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 123,712.50 -
- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -
- - Rp 63,096.00 - -
- - Rp 36,069.00 - -
- - Rp 3,960.00 - -
- - Rp 4,323.00 - -
Rp 1,815,000.00 - - Rp 72,600.00 -
Rp 15,000.00 - - Rp 4,500.00 -
Rp 16,500.00 - - Rp 1,650.00 -
Rp 1,705,000.00 - - Rp 25,575.00 -
Rp 111,000.00 - - Rp 38,850.00 -
Rp 25,000.00 - - Rp 50,000.00 -
Rp 107,448.00 Rp 193,175.00 -
- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -
- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -
- - Rp 63,096.00 - -
- - Rp 36,069.00 - -
- - Rp 3,960.00 - -
- - Rp 4,323.00 - -
Rp 1,815,000.00 - - Rp 72,600.00 -
Rp 15,000.00 - - Rp 6,000.00 -
Rp 16,500.00 - - Rp 3,300.00 -
Rp 1,705,000.00 - - Rp 25,575.00 -
Rp 111,000.00 - - Rp 38,850.00 -
Rp 25,000.00 - - Rp 150,000.00 -
Rp 107,448.00 Rp 296,325.00 -
- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -
- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -
- - Rp 49,712.00 - -
- - Rp 28,418.00 - -
- - Rp 3,120.00 - -
- - Rp 3,406.00 - -
Rp 1,815,000.00 - - Rp 72,600.00 -
Rp 15,000.00 - - Rp 6,000.00 -
Rp 16,500.00 - - Rp 3,300.00 -
Rp 84,656.00 Rp 81,900.00 -
- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -
- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -
- - Rp 49,712.00 - -
- - Rp 28,418.00 - -
- - Rp 3,120.00 - -
- - Rp 3,406.00 - -
Rp 1,815,000.00 - - Rp 72,600.00 -
Rp 15,000.00 - - Rp 6,000.00 -
Rp 16,500.00 - - Rp 3,300.00 -
Rp 1,705,000.00 - - Rp 25,575.00 -
Rp 111,000.00 - - Rp 38,850.00 -
Rp 25,000.00 - - Rp 50,000.00 -
Rp 84,656.00 Rp 196,325.00 -
- - Rp 157,740.00 - -
- - Rp 30,057.50 - -
- - Rp 3,360.00 - -
- - Rp 10,873.00 - -
Rp 1,100.00 - - Rp 408,100.00 -
Rp 179.00 - - Rp 124,942.00 -
Rp 139.00 - - Rp 145,533.00 -
Rp 8.00 - - Rp 1,720.00 -
Rp 202,030.50 Rp 680,295.00 -
- - Rp 6,692.00 - -
- - Rp 7,651.00 - -
- - Rp 840.00 - -
- - Rp 524.00 - -
Rp 9,500.00 - - Rp 99,750.00 -
Rp 25,000.00 - - Rp 3,750.00 -
Rp 15,707.00 Rp 103,500.00 -
- - Rp 49,712.00 - -
- - Rp 28,418.00 - -
- - Rp 3,120.00 - -
- - Rp 3,406.00 - -
Rp 1,815,000.00 - - Rp 54,450.00 -
Rp 15,000.00 - - Rp 6,000.00 -
Rp 16,500.00 - - Rp 2,475.00 -
Rp 1,705,000.00 - - Rp 25,575.00 -
Rp 111,000.00 - - Rp 38,850.00 -
Rp 25,000.00 - - Rp 50,000.00 -
Rp 84,656.00 Rp 177,350.00 -
Jumlah (Rp) No Uraian Pekerjaan
11 = ( 8+9+10) 1 2
D
D.1 PEKERJAAN TIE BEAM
D.1.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Rp 157,740.00 Pekerja
Rp 30,057.50 Tukang Batu
Rp 3,360.00 Kepala Tukang Batu
Rp 10,873.00 Mandor
Rp 408,100.00 Semen Portland
Rp 124,942.00 Pasir Beton
Rp 145,533.00 Kerikil
Rp 1,720.00 Air
Rp 882,325.50
Rp 6,692.00
No Uraian Pekerjaan
Rp 7,651.00
Rp 840.00 1 2
Rp 524.00 D.1.2 Pembesian 10 Kg dengan besi ulir
Rp 119,962.50 Pekerja
Rp 3,750.00 Tukang Batu
Rp 139,419.50 Kepala Tukang Batu
Mandor
Rp 6,692.00 Besi Beton
Rp 7,651.00 Kawat Beton
Rp 840.00
Rp 524.00
Rp 99,750.00
No Uraian Pekerjaan
Rp 3,750.00
Rp 119,207.00 1 2
D.1.3 Pembesian 10 Kg dengan besi polos
Rp 49,712.00 Pekerja
Rp 28,418.00 Tukang Batu
Rp 3,120.00 Kepala Tukang Batu
Rp 3,406.00 Mandor
Rp 81,675.00 Besi Beton
Rp 4,500.00 Kawat Beton
Rp 1,650.00
Rp 172,481.00
No Uraian Pekerjaan
Rp 157,740.00 1 2
Rp 30,057.50 D.1.4 Pemasangan Bekisting untuk tie beam
Rp 3,360.00 Pekerja
Rp 10,873.00 Tukang Kayu
Rp 408,100.00 Kepala Tukang Kayu
Rp 124,942.00 Mandor
Rp 145,533.00 Kayu Kelas III (Papan Albasia)
Rp 1,720.00 Paku 5-10 cm
Rp 882,325.50 Minyak Bekisting
Rp 6,692.00
Rp 7,651.00
No Uraian Pekerjaan
Rp 840.00
Rp 524.00 1 2
Rp 119,962.50 D.2 PEKERJAAN KOLOM
Rp 3,750.00 D.2.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Rp 139,419.50 Pekerja
Tukang Batu
Rp 6,692.00 Kepala Tukang Batu
Rp 7,651.00 Mandor
Rp 840.00 Semen Portland
Rp 524.00 Pasir Beton
Rp 99,750.00 Kerikil
Rp 3,750.00 Air
Rp 119,207.00
Rp 63,096.00
No Uraian Pekerjaan
Rp 36,069.00
Rp 3,960.00 1 2
Rp 4,323.00 D.2.2 Pembesian 10 Kg dengan besi Ulir
Rp 72,600.00 Pekerja
Rp 4,500.00 Tukang Batu
Rp 1,650.00 Kepala Tukang Batu
Rp 25,575.00 Mandor
Rp 38,850.00 Besi Beton Ulir
Rp 50,000.00 Kawat Beton
Rp 300,623.00
No Uraian Pekerjaan
No Uraian Pekerjaan
Rp 157,740.00
Rp 30,057.50 1 2
Rp 3,360.00 D.2.3 Pembesian 10 Kg dengan besi Polos
Rp 10,873.00 Pekerja
Rp 408,100.00 Tukang Batu
Rp 124,942.00 Kepala Tukang Batu
Rp 145,533.00 Mandor
Rp 1,720.00 Besi Beton Polos
Rp 882,325.50 Kawat Beton
Rp 6,692.00
Rp 7,651.00
No Uraian Pekerjaan
Rp 840.00
Rp 524.00 1 2
Rp 119,962.50 D.2.4 Pemasangan 1m2 Bekisting Untuk Kolom
Rp 3,750.00 Pekerja
Rp 139,419.50 Tukang Kayu
Kepala Tukang Kayu
Rp 6,692.00 Mandor
Rp 7,651.00 Kayu Kelas III (Papan Albasia)
Rp 840.00 Paku 8-12 cm
Rp 524.00 Minyak Bekisting
Rp 99,750.00 Balok Kayu Kelas II (Balok Albasia)
Rp 3,750.00 Triplek 9 mm 120 x 240
Rp 119,207.00 Dolken Kayu Ø 8-10 cm panj. 4m
Rp 63,096.00
Rp 36,069.00
No Uraian Pekerjaan
Rp 3,960.00
Rp 4,323.00 1 2
Rp 72,600.00 D.3 PEKERJAAN BALOK
Rp 4,500.00 D.3.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Rp 1,650.00 Pekerja
Rp 25,575.00 Tukang Batu
Rp 38,850.00 Kepala Tukang Batu
Rp 50,000.00 Mandor
Rp 300,623.00 Semen Portland
Pasir Beton
Kerikil
Rp 157,740.00 Air
Rp 30,057.50
Rp 3,360.00
Rp 10,873.00
No Uraian Pekerjaan
No Uraian Pekerjaan
Rp 408,100.00
Rp 124,942.00 1 2
Rp 145,533.00 D.3.2 Pembesian 10 Kg dengan besi ulir
Rp 1,720.00 Pekerja
Rp 882,325.50 Tukang Batu
Kepala Tukang Batu
Rp 6,692.00 Mandor
Rp 7,651.00 Besi Beton Ulir
Rp 840.00 Kawat Beton
Rp 524.00
Rp 99,750.00
Rp 3,750.00
No Uraian Pekerjaan
Rp 119,207.00
1 2
Rp 63,096.00 D.3.3 Pembesian 10 Kg dengan besi polos
Rp 36,069.00 Pekerja
Rp 3,960.00 Tukang Batu
Rp 4,323.00 Kepala Tukang Batu
Rp 72,600.00 Mandor
Rp 6,000.00 Besi Beton Polos
Rp 3,300.00 Kawat Beton
Rp 25,575.00
Rp 38,850.00
Rp 150,000.00
No Uraian Pekerjaan
Rp 403,773.00
1 2
D.3.4 Pemasangan 1m2 Bekisting Untuk Balok
Rp 157,740.00 Pekerja
Rp 30,057.50 Tukang Kayu
Rp 3,360.00 Kepala Tukang Kayu
Rp 10,873.00 Mandor
Rp 408,100.00 Kayu Kelas III (Papan Albasia)
Rp 124,942.00 Paku 5-10 cm
Rp 145,533.00 Minyak Bekisting
Rp 1,720.00 Balok Kayu Kelas II (Balok Albasia)
Rp 882,325.50 Triplek 9 mm 120 x 240
Dolken Kayu Ø 8-10 cm panj. 4m
Rp 6,692.00
Rp 7,651.00
Rp 840.00
No Uraian Pekerjaan
Rp 524.00
Rp 99,750.00 1 2
Rp 3,750.00 D.4 PEKERJAAN PLAT LANTAI
Rp 119,207.00 D.4.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Pekerja
Rp 49,712.00 Tukang Batu
Rp 28,418.00 Kepala Tukang Batu
Rp 3,120.00 Mandor
Rp 3,406.00 Semen Portland
Rp 72,600.00 Pasir Beton
Rp 6,000.00 Kerikil
Rp 3,300.00 Air
Rp 166,556.00
No Uraian Pekerjaan
Rp 157,740.00
Rp 30,057.50 1 2
Rp 3,360.00 D.4.2 Pembesian 10 Kg dengan besi polos
Rp 10,873.00 Pekerja
Rp 408,100.00 Tukang Batu
Rp 124,942.00 Kepala Tukang Batu
Rp 145,533.00 Mandor
Rp 1,720.00 Besi Beton
Rp 882,325.50 Kawat Beton
Rp 6,692.00
Rp 7,651.00
No Uraian Pekerjaan
Rp 840.00
Rp 524.00 1 2
Rp 99,750.00 D.4.3 Pemasangan 1m2 Bekisting Untuk Plat Lantai
Rp 3,750.00 Pekerja
Rp 119,207.00 Tukang Kayu
Kepala Tukang Kayu
Rp 49,712.00 Mandor
Rp 28,418.00 Kayu Kelas III (Papan Albasia)
Rp 3,120.00 Paku 5-10 cm
Rp 3,406.00 Minyak Bekisting
Rp 72,600.00 Balok Kayu Kelas II (Balok Albasia)
Rp 6,000.00 Triplek 9 mm 120 x 240
Rp 3,300.00 Dolken Kayu Ø 8-10 cm panj. 4m
Rp 25,575.00
Rp 38,850.00
Rp 50,000.00
No Uraian Pekerjaan
Rp 280,981.00
1 2
D.5 PEKERJAAN RING BALOK
Rp 157,740.00 D.5.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Rp 30,057.50 Pekerja
Rp 3,360.00 Tukang Batu
Rp 10,873.00 Kepala Tukang Batu
Rp 408,100.00 Mandor
Rp 124,942.00 Semen Portland
Rp 145,533.00 Pasir Beton
Rp 1,720.00 Kerikil
Rp 882,325.50 Air
Rp 6,692.00
Rp 7,651.00
No Uraian Pekerjaan
Rp 840.00
Rp 524.00 1 2
Rp 99,750.00 D.5.2 Pembesian 10 Kg dengan besi polos
Rp 3,750.00 Pekerja
Rp 119,207.00 Tukang Batu
Kepala Tukang Batu
Rp 49,712.00 Mandor
Rp 28,418.00 Besi Beton
Rp 3,120.00 Kawat Beton
Rp 3,406.00
Rp 54,450.00
Rp 6,000.00
No Uraian Pekerjaan
Rp 2,475.00
Rp 25,575.00 1 2
Rp 38,850.00 D.5.3 Pemasangan 1m2 Bekisting Untuk Ringbalok
Rp 50,000.00 Pekerja
Rp 262,006.00 Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Kelas III (Papan Albasia)
Paku 5-10 cm
Minyak Bekisting
No Uraian Pekerjaan
1 2
D.6 PEKERJAAN PELAT ATAP
D.6.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Beton
Kerikil
Air
No Uraian Pekerjaan
1 2
D.6.2 Pembesian 10 Kg dengan besi polos
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Besi Beton
Kawat Beton
No Uraian Pekerjaan
1 2
D.6.3 Pemasangan 1m2 Bekisting Untuk Plat Atap
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Kelas III (Papan Albasia)
Paku 5-10 cm
Minyak Bekisting
Balok Kayu Kelas II (Balok Albasia)
Triplek 9 mm 120 x 240
Dolken Kayu Ø 8-10 cm panj. 4m
No Uraian Pekerjaan
1 2
D.7 PEKERJAAN TANGGA
D.7.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Beton
Kerikil
Air
No Uraian Pekerjaan
1 2
D.7.2 Pembesian 10 Kg dengan besi polos
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Besi Beton
Kawat Beton
No Uraian Pekerjaan
1 2
D.7.3 Pemasangan 1m2 Bekisting Untuk Tangga
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Kelas III (Papan Albasia)
Paku 5-10 cm
Minyak Bekisting
Kayu Kelas II (Balok Albasia)
Triplek 9 mm 120 x 240
Dolken Kayu Ø 8-10 cm panj. 4m
KEBUTUHAN BAHAN DAN TENAGA KERJA PEKERJAAN BET
6.05785125 - - Rp 579,130.58 - -
1.00964188 - - Rp 110,353.86 - -
0.1027999 - - Rp 12,335.99 - -
0.30472828 - - Rp 39,919.40 - -
- 1362.098675 - - Rp 1,498,308.54 -
- 2562.65465 - - Rp 458,715.18 -
- 3843.981975 - - Rp 534,313.49 -
- 789.356375 - - Rp 6,314.85 -
Jumlah Rp 741,739.83 Rp 2,497,652.07 -
Total Rp 3,239,391.90
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
0.83746208 - - Rp 80,061.37 - -
0.83746208 - - Rp 91,534.61 - -
0.08374621 - - Rp 10,049.54 - -
0.04785498 - - Rp 6,269.00 - -
- 125.619312 - - Rp 1,435,200.64 -
- 1.7945616 - - Rp 44,864.04 -
Jumlah Rp 187,914.53 Rp 1,480,064.68 -
Total Rp 1,667,979.21
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
4.121 - - Rp 394,009.59 - -
4.121 - - Rp 450,473.30 - -
0.412 - - Rp 49,457.27 - -
0.236 - - Rp 30,851.92 - -
- 618.216 - - Rp 5,873,050.83 -
- 8.832 - - Rp 220,791.38 -
Jumlah Rp 924,792.07 Rp 6,093,842.21 -
Total Rp 7,018,634.29
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
23.59396 - - Rp 2,255,582.58 - -
11.79698 - - Rp 1,289,409.91 - -
1.179698 - - Rp 141,563.76 - -
1.179698 - - Rp 154,540.44 - -
- 2.041785 - - Rp 3,705,839.78 -
- 13.6119 - - Rp 204,178.50 -
- 4.5373 - - Rp 74,865.45 -
Jumlah Rp 3,841,096.69 Rp 3,984,883.73 -
Total Rp 7,825,980.41
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
19.2454977 - - Rp 1,839,869.58 - -
3.20758295 - - Rp 350,588.82 - -
0.32659026 - - Rp 39,190.83 - -
0.96810685 - - Rp 126,822.00 - -
- 4327.320998 - - Rp 4,760,053.10 -
- 8141.428724 - - Rp 1,457,315.74 -
- 12212.143086 - - Rp 1,697,487.89 -
- 2507.74667 - - Rp 20,061.97 -
Jumlah Rp 2,356,471.23 Rp 7,934,918.70 -
Total Rp 10,291,389.93
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
3.209388 - - Rp 306,817.49 - -
3.209388 - - Rp 350,786.11 - -
0.3209388 - - Rp 38,512.66 - -
0.1833936 - - Rp 24,024.56 - -
- 481.4082 - - Rp 5,500,088.69 -
- 6.87726 - - Rp 171,931.50 -
Jumlah Rp 720,140.82 Rp 5,672,020.19 -
Total Rp 6,392,161.00
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
15.592752 - - Rp 1,490,667.09 - -
15.592752 - - Rp 1,704,287.79 - -
1.5592752 - - Rp 187,113.02 - -
0.8910144 - - Rp 116,722.89 - -
- 2338.9128016 - - Rp 22,219,671.62 -
- 33.413040023 - - Rp 835,326.00 -
Jumlah Rp 3,498,790.80 Rp 23,054,997.62 -
Total Rp 26,553,788.41
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
175.674378 - - Rp 16,794,470.54 - -
87.837189 - - Rp 9,600,604.76 - -
8.7837189 - - Rp 1,054,046.27 - -
8.7837189 - - Rp 1,150,667.18 - -
- 10.646932 - - Rp 19,324,181.58 -
- 79.85199 - - Rp 1,197,779.85 -
- 26.61733 - - Rp 439,185.95 -
- 3.9925995 - - Rp 6,807,382.15 -
- 93.160655 - - Rp 10,340,832.71 -
- 532.3466 - - Rp 13,308,665.00 -
Jumlah Rp 28,599,788.74 Rp 51,418,027.23 -
Total Rp 80,017,815.97
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
15.1135578 - - Rp 1,444,856.13 - -
2.5189263 - - Rp 275,318.64 - -
0.2564725 - - Rp 30,776.70 - -
0.76025776 - - Rp 99,593.77 - -
- 3398.260572 - - Rp 3,738,086.63 -
- 6393.492936 - - Rp 1,144,435.24 -
- 9590.239404 - - Rp 1,333,043.28 -
- 1969.34238 - - Rp 15,754.74 -
Jumlah Rp 1,850,545.24 Rp 6,231,319.88 -
Total Rp 8,081,865.12
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
2.23873104 - - Rp 214,022.69 - -
2.23873104 - - Rp 244,693.30 - -
0.2238731 - - Rp 26,864.77 - -
0.12792749 - - Rp 16,758.50 - -
- 335.809656 - - Rp 3,836,625.32 -
- 4.7972808 - - Rp 119,932.02 -
Jumlah Rp 502,339.26 Rp 3,956,557.34 -
Total Rp 4,458,896.60
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
8.81023391 - - Rp 842,258.36 - -
8.81023391 - - Rp 962,958.57 - -
0.88102339 - - Rp 105,722.81 - -
0.50344194 - - Rp 65,950.89 - -
- 1321.5350868 - - Rp 12,554,583.32 -
- 18.879072669 - - Rp 471,976.82 -
Jumlah Rp 1,976,890.63 Rp 13,026,560.14 -
Total Rp 15,003,450.77
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
101.653042 - - Rp 9,718,030.78 - -
50.8265208 - - Rp 5,555,338.72 - -
5.08265208 - - Rp 609,918.25 - -
5.08265208 - - Rp 665,827.42 - -
- 6.1607904 - - Rp 11,181,834.58 -
- 46.205928 - - Rp 693,088.92 -
- 15.401976 - - Rp 254,132.60 -
- 2.3102964 - - Rp 3,939,055.36 -
- 53.906916 - - Rp 5,983,667.68 -
- 308.03952 - - Rp 7,700,988.00 -
Jumlah Rp 16,549,115.17 Rp 29,752,767.14 -
Total Rp 46,301,882.31
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
35.8432037 - - Rp 3,426,610.27 - -
5.97386728 - - Rp 652,943.69 - -
0.60824831 - - Rp 72,989.80 - -
1.80302176 - - Rp 236,195.85 - -
- 8059.290045 - - Rp 8,865,219.05 -
- 15162.761324 - - Rp 2,714,134.28 -
- 22744.141987 - - Rp 3,161,435.74 -
- 4670.4780584 - - Rp 37,363.82 -
Jumlah Rp 4,388,739.62 Rp 14,778,152.89 -
Total Rp 19,166,892.50
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
11.0036866 - - Rp 1,051,952.44 - -
11.0036866 - - Rp 1,202,702.95 - -
1.10036866 - - Rp 132,044.24 - -
0.62878209 - - Rp 82,370.45 - -
- 1650.5529959 - - Rp 15,680,253.46 -
- 23.579328512 - - Rp 589,483.21 -
Jumlah Rp 2,469,070.09 Rp 16,269,736.67 -
Total Rp 18,738,806.76
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
121.49181 - - Rp 11,614,617.04 - -
60.745905 - - Rp 6,639,527.42 - -
6.0745905 - - Rp 728,950.86 - -
6.0745905 - - Rp 795,771.36 - -
- 7.36314 - - Rp 13,364,099.10 -
- 73.6314 - - Rp 1,104,471.00 -
- 36.8157 - - Rp 607,459.05 -
- 2.7611775 - - Rp 4,707,807.64 -
- 64.427475 - - Rp 7,151,449.73 -
- 1104.471 - - Rp 27,611,775.00 -
Jumlah Rp 19,778,866.67 Rp 54,547,061.51 -
Total Rp 74,325,928.18
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
7.72039125 - - Rp 738,069.40 - -
1.28673188 - - Rp 140,639.79 - -
0.1310127 - - Rp 15,721.52 - -
0.38835908 - - Rp 50,875.04 - -
- 1735.918275 - - Rp 1,909,510.10 -
- 3265.95945 - - Rp 584,606.74 -
- 4898.939175 - - Rp 680,952.55 -
- 1005.990375 - - Rp 8,047.92 -
Jumlah Rp 945,305.76 Rp 3,183,117.31 -
Total Rp 4,128,423.07
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
6.30219514 - - Rp 602,489.86 - -
6.30219514 - - Rp 688,829.93 - -
0.63021951 - - Rp 75,626.34 - -
0.36012544 - - Rp 47,176.43 - -
- 945.3292709 - - Rp 8,980,628.07 -
- 13.50470387 - - Rp 337,617.60 -
Jumlah Rp 1,414,122.56 Rp 9,318,245.67 -
Total Rp 10,732,368.23
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
37.4322 - - Rp 3,578,518.32 - -
18.7161 - - Rp 2,045,669.73 - -
1.87161 - - Rp 224,593.20 - -
1.87161 - - Rp 245,180.91 - -
- 2.8794 - - Rp 5,226,111.00 -
- 28.794 - - Rp 431,910.00 -
- 14.397 - - Rp 237,550.50 -
Jumlah Rp 2,515,443.84 Rp 5,895,571.50 -
Total Rp 8,411,015.34
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
8.821725 - - Rp 843,356.91 - -
1.4702875 - - Rp 160,702.42 - -
0.149702 - - Rp 17,964.24 - -
0.4437595 - - Rp 58,132.49 - -
- 1983.5515 - - Rp 2,181,906.65 -
- 3731.857 - - Rp 668,002.40 -
- 5597.7855 - - Rp 778,092.18 -
- 1149.4975 - - Rp 9,195.98 -
Jumlah Rp 1,080,156.07 Rp 3,637,197.22 -
Total Rp 4,717,353.29
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
4.11608177 - - Rp 393,497.42 - -
4.11608177 - - Rp 449,887.74 - -
0.41160818 - - Rp 49,392.98 - -
0.23520467 - - Rp 30,811.81 - -
- 617.41226488 - - Rp 5,865,416.52 -
- 8.8201752125 - - Rp 220,504.38 -
Jumlah Rp 923,589.95 Rp 6,085,920.90 -
Total Rp 7,009,510.84
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
27.8018 - - Rp 2,657,852.08 - -
13.9009 - - Rp 1,519,368.37 - -
1.39009 - - Rp 166,810.80 - -
1.39009 - - Rp 182,101.79 - -
- 2.1386 - - Rp 3,881,559.00 -
- 21.386 - - Rp 320,790.00 -
- 10.693 - - Rp 176,434.50 -
- 0.801975 - - Rp 1,367,367.38 -
- 18.71275 - - Rp 2,077,115.25 -
- 106.93 - - Rp 2,673,250.00 -
Jumlah Rp 4,526,133.04 Rp 10,496,516.13 -
Total Rp 15,022,649.17
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
5.4343245 - - Rp 519,521.42 - -
0.90572075 - - Rp 98,995.28 - -
0.09221884 - - Rp 11,066.26 - -
0.27336299 - - Rp 35,810.55 - -
- 1221.89963 - - Rp 1,344,089.59 -
- 2298.88394 - - Rp 411,500.23 -
- 3448.32591 - - Rp 479,317.30 -
- 708.10895 - - Rp 5,664.87 -
Jumlah Rp 665,393.51 Rp 2,240,571.99 -
Total Rp 2,905,965.50
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
2.62841173 - - Rp 251,276.16 - -
2.62841173 - - Rp 287,285.40 - -
0.26284117 - - Rp 31,540.94 - -
0.15019496 - - Rp 19,675.54 - -
- 394.2617588 - - Rp 3,745,486.71 -
- 5.63231084 - - Rp 140,807.77 -
Jumlah Rp 589,778.04 Rp 3,886,294.48 -
Total Rp 4,476,072.52
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
10.892648 - - Rp 1,041,337.15 - -
5.446324 - - Rp 595,283.21 - -
0.5446324 - - Rp 65,355.89 - -
0.5446324 - - Rp 71,346.84 - -
- 0.628422 - - Rp 1,140,585.93 -
- 8.37896 - - Rp 125,684.40 -
- 3.14211 - - Rp 51,844.82 -
- 0.314211 - - Rp 535,729.76 -
- 7.33159 - - Rp 813,806.49 -
- 41.8948 - - Rp 1,047,370.00 -
Jumlah Rp 1,773,323.09 Rp 3,715,021.39 -
Total Rp 5,488,344.48
1. COR BETON
TIPE TB 1
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.15 0.2 1.8 4D-5D
2 0.15 0.2 1.8 4D'-5D'
Total Volume Cor (m3)
TIPE TB 2A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.15 0.25 2.2 F1-G1
2 0.15 0.25 3.12 C2-D1
3 0.15 0.25 2.2 F3'-G3'
4 0.15 0.25 2.2 F4-G4
5 0.15 0.25 3.15 A5-B5
Total Volume Cor (m3)
TIPE TB 2B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.15 0.25 3.4 D1-F1
2 0.15 0.25 3 C3-D3
3 0.15 0.25 3 C4-D4
4 0.15 0.25 2.25 B7-C7
5 0.15 0.25 3.15 A7-B7
6 0.15 0.25 3 GB-7B
7 0.15 0.25 2.2 3A-4A
8 0.15 0.25 1.8 4A-5A
9 0.15 0.25 3 6A-7A
Total Volume Cor (m3)
TIPE TB 3A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.15 0.3 3 C5-D5
2 0.15 0.3 5.4 A2-C2
3 0.15 0.3 1.5 2A-3A
4 0.15 0.3 4 5G-7G
Total Volume Cor (m3)
TIPE TB 4
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.15 0.35 4 E7-G7
2 0.15 0.35 4.6 C7-E7
Total Volume Cor (m3)
TIPE TB 5A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.2 0.35 1.47 1G-3'G
2 0.2 0.35 2.7 3'G-4G
3 0.2 0.35 1.8 4G-5G
4 0.2 0.35 1.47 1F-3'F
5 0.2 0.35 2.7 3'F-4F
6 0.2 0.35 1 1'G-1G
7 0.2 0.35 2 1D-3D
8 0.2 0.35 2.2 3D-4D
Total Volume Cor (m3)
1. COR BETON
K1
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.2 3.78 15
Lantai 2 0.13 0.2 3.805 5
Total Volume Cor (m3)
K2A
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.25 3.78 18
Lantai 2 0.13 0.25 3.805 17
Total Volume Cor (m3)
K2B
Dimensi (m)
No Jumlah
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.25 3.78 3
Lantai 2 0.13 0.25 3.805 2
Total Volume Cor (m3)
K3
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.3 3.78 4
Lantai 2 0.13 0.3 3.805 4
Total Volume Cor (m3)
K4A
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.35 3.78 3
Lantai 2 0.13 0.35 3.805 3
Total Volume Cor (m3)
K4B
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.35 3.78 2
Lantai 2 0.13 0.35 3.805 2
Total Volume Cor (m3)
KOLOM PRAKTIS
Dimensi (m)
No Jumlah
Lebar Tinggi Panjang
Lantai 1 0.13 0.13 3.78 19
Lantai 2 0.13 0.13 3.805 10
Total Volume Cor (m3)
1. COR BETON
TIPE B1
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.2 3.09 As 9
2 0.13 0.2 3.09 As 10
3 0.13 0.2 14.94 As G
Total Volume Cor (m3)
TIPE B2A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.25 3.94 As 9
2 0.13 0.25 7.03 AS 10
3 0.13 0.25 12.2 As A
4 0.13 0.25 1.7 AS D
5 0.13 0.25 10 As G
Total Volume Cor (m3)
TIPE B2B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.25 9.29 As 1
2 0.13 0.25 3 As 3
3 0.13 0.25 4 As D
4 0.13 0.25 1.59 AS G
Total Volume Cor (m3)
TIPE B3A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.3 3.4 As 1
2 0.13 0.3 3 AS 2
3 0.13 0.3 5.54 As 4
4 0.13 0.3 4 As A
5 0.13 0.3 2.5 As C
6 0.13 0.3 6.54 As D
Total Volume Cor (m3)
TIPE B3B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.3 3 As 1
2 0.13 0.3 5.34 As 5
3 0.13 0.3 5.8 As A
Total Volume Cor (m3)
TIPE B4A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.35 10.68 As 2
2 0.13 0.35 4 AS G
Total Volume Cor (m3)
TIPE B4B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.35 3 As 4
2 0.13 0.35 6.91 As 7
3 0.13 0.35 5.24 As C
4 0.13 0.35 7 AS G
Total Volume Cor (m3)
TIPE B5B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.2 0.35 5.33 As 3
2 0.2 0.35 13.87 As 7
3 0.2 0.35 5.8 AS C
Total Volume Cor (m3)
TIPE 6A
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.2 0.4 8.54 As 5
Total Volume Cor (m3)
TIPE 6B
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.2 0.4 5.33 As 3
2 0.2 0.4 5.33 As 4
Total Volume Cor (m3)
TIPE BC 1
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.12 0.2 3.4 As 1
2 0.12 0.2 9.883 As 7
Total Volume Cor (m3)
TIPE BC 2
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.12 0.25 3 As 7
Total Volume Cor (m3)
1. COR BETON
Dimensi (m)
Nama Luas (m2)
Panjang Lebar Tinggi
4.2 3.15 0.12 13.23
R. Pembantu
2 3.15 0.12 6.3
Kanopi Jendela 1.17 0.5 0.1 0.585
3.15 2 0.12 6.3
Teras Belakang
6.6 0.9 0.12 5.94
Kanopi Jendela 0.5 2.3 0.1 1.15
Bagian 1 8.6 5.8 0.12 49.88
Bagian 2 5.4 5.8 0.12 31.32
Bagian 3 (Bordes Tang 2.2 1.5 0.12 3.3
Bagian 4 6.4 4.2 0.12 26.88
Bagian 5 5.4 2.2 0.12 11.88
3.332 0.935 0.12 3.11542
Bagian 6
1.216 2.933 0.12 3.566528
3.5 4.184 0.12 14.644
Bagian 7 (depan)
4.549 0.5 0.12 2.2745
Kanopi Depan 1.9 0.5 0.12 0.95
Total Cor Beton Pelat Lantai (m3)
1. COR BETON
TIPE RB 1
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.2 2.2 3B-4B
Total Cor Beton Ring Balok (m3)
TIPE RB 2
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.25 2 1G-3G
2 0.13 0.25 2.2 3G-4G
3 0.13 0.25 1.8 4G-5G
4 0.13 0.25 4 5G-7G
5 0.13 0.25 2.2 F7-G7
6 0.13 0.25 2.2 F5-G5
7 0.13 0.25 2.2 F2-G2
8 0.13 0.25 3.4 D1-F1
9 0.13 0.25 3 C1-D1
10 0.13 0.25 2.25 B3-C3
11 0.13 0.25 3.15 A3-B3
12 0.13 0.25 1.575 A4-B'4
13 0.13 0.25 1.575 A6-B'6
14 0.13 0.25 1.575 A7-B'7
15 0.13 0.25 2.25 B3-C3
16 0.13 0.25 3.825 B'4-C4
17 0.13 0.25 3.825 B'6-C6
18 0.13 0.25 3.825 B'7-C7
19 0.13 0.25 3 C5-D5
20 0.13 0.25 10 1F-7F
Total Cor Beton Ring Balok (m3)
TIPE RB 3
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.3 6.4 C7-F7
2 0.13 0.3 3.4 D5-F5
3 0.13 0.3 5 5E-7E
4 0.13 0.3 5 5D-7D
5 0.13 0.3 5 5C-7C
6 0.13 0.3 2.2 3C-4C
7 0.13 0.3 5.4 A4-C4
8 0.13 0.3 9 3A-7A
9 0.13 0.3 6 1C-4C
Total Cor Beton Ring Balok (m3)
TIPE RB 4
Dimensi (m)
No Nama As
Lebar Tinggi Panjang
1 0.13 0.35 5.8 4B'-7B'
2 0.13 0.35 6 1C-5C
3 0.13 0.35 6.4 C3'-F3'
Total Cor Beton Ring Balok (m3)
1. COR BETON
Dimensi (m)
AS Luas (m2)
Panjang Lebar Tinggi
Panjang : 1G-7G
10 2.2 0.1 22
Lebar : F1-G1
Panjang : A3-C3
5.4 2.2 0.1 11.88
Lebar : 3A-4A
Panjang : 4A-7A
5.8 1.575 0.1 9.135
Lebar : A4-B'4
1.15 3 0.1 3.45
Bagian Depan
4.15 1 0.1 4.15
Kanopi Jendela 1 1.9 0.5 0.1 0.95
Kanopi Jendela 2 1.9 0.5 0.1 0.95
Kanopi Jendela 3 1.9 0.5 0.1 0.95
Total Cor Beton Pelat Atap (m3)
1. COR BETON
Dimensi Tangga
Antrede = 0.27 m
Optrede = 0.18 m
Lebar Tangga = 1 m
Jumlah Anak Tangga = 21 Buah
Panjang = 2.2 m
Dimensi Bordes Lebar= 1.5 m
Tebal= 0.15 m
Panjang Sisi Miring Pla = 3.12 m
Panjang Sisi Miring Pla = 3.287 m
Volume Beton
Vol. Cor Anak Tangga = 1.021 m3
Vol. Bordes = 0.495 m3
Vol. Balok Bordes = 0.120 m3
Tebal Pelat = 0.120 m
Vol. Bawah Tangga 1 = 0.374 m3
Vol. Bawah Tangga 2 = 0.394 m3
Vol. Pelat Tangga = 0.769 m3
Total Volume Cor 3.294 m3
VOLUME PEKERJAAN BETON
TIE BEAM
N 2. BEKISTING
TIPE TB 1
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.03 0.0540 1 0.15 0.2 1.8
0.03 0.0540 2 0.15 0.2 1.8
0.108 Total Volume Bekisting (m2)
TIPE TB 2A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0375 0.0825 1 0.15 0.25 2.2
0.0375 0.1170 2 0.15 0.25 3.12
0.0375 0.0825 3 0.15 0.25 2.2
0.0375 0.0825 4 0.15 0.25 2.2
0.0375 0.1181 5 0.15 0.25 3.15
0.483 Total Volume Bekisting (m2)
TIPE TB 2B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0375 0.1275 1 0.15 0.25 3.4
0.0375 0.1125 2 0.15 0.25 3
0.0375 0.1125 3 0.15 0.25 3
0.0375 0.0844 4 0.15 0.25 2.25
0.0375 0.1181 5 0.15 0.25 3.15
0.0375 0.1125 6 0.15 0.25 3
0.0375 0.0825 7 0.15 0.25 2.2
0.0375 0.0675 8 0.15 0.25 1.8
0.0375 0.1125 9 0.15 0.25 3
0.930 Total Volume Bekisting (m2)
TIPE TB 3A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.045 0.1350 1 0.15 0.3 3
0.045 0.2430 2 0.15 0.3 5.4
0.045 0.0675 3 0.15 0.3 1.5
0.045 0.1800 4 0.15 0.3 4
0.626 Total Volume Bekisting (m2)
TIPE TB 4
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0525 0.2100 1 0.15 0.35 4
0.0525 0.2415 2 0.15 0.35 4.6
0.452 Total Volume Bekisting (m3)
TIPE TB 5A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.07 0.1029 1 0.2 0.35 1.47
0.07 0.1890 2 0.2 0.35 2.7
0.07 0.1260 3 0.2 0.35 1.8
0.07 0.1029 4 0.2 0.35 1.47
0.07 0.1890 5 0.2 0.35 2.7
0.07 0.0700 6 0.2 0.35 1
0.07 0.1400 7 0.2 0.35 2
0.07 0.1540 8 0.2 0.35 2.2
1.074 Total Volume Bekisting (m3)
KOLOM
N 2. BEKISTING
K1
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.026 1.474 Lantai 1 0.13 0.2 3.78
0.026 0.495 Lantai 2 0.13 0.2 3.805
1.969 Total Volume Bekisting (m2)
K2A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0325 2.211 Lantai 1 0.13 0.25 3.78
0.0325 2.102 Lantai 2 0.13 0.25 3.805
4.314 Total Volume Bekisting (m2)
K2B
Dimensi (m)
Luas (m2) Volume (m3) No
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0325 0.369 Lantai 1 0.13 0.25 3.78
0.0325 0.247 Lantai 2 0.13 0.25 3.805
0.616 Total Volume Bekisting (m2)
K3
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.039 0.590 Lantai 1 0.13 0.3 3.78
0.039 0.594 Lantai 2 0.13 0.3 3.805
1.183 Total Volume Bekisting (m2)
K4A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0455 0.516 Lantai 1 0.13 0.35 3.78
0.0455 0.519 Lantai 2 0.13 0.35 3.805
1.035 Total Volume Bekisting (m2)
K4B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0455 0.344 Lantai 1 0.13 0.35 3.78
0.0455 0.346 Lantai 2 0.13 0.35 3.805
0.690 Total Volume Bekisting (m2)
TIS KOLOM PRAKTIS
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0169 1.214 Lantai 1 0.13 0.13 3.78
0.0169 0.643 Lantai 2 0.13 0.13 3.805
1.857 Total Volume Bekisting (m2)
BALOK
N 2. BEKISTING
TIPE B1
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.026 0.0803 1 0.13 0.2 3.09
0.026 0.0803 2 0.13 0.2 3.09
0.026 0.3884 3 0.13 0.2 14.94
0.549 Total Volume Bekisting (m2)
TIPE B2A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0325 0.1281 1 0.13 0.25 3.94
0.0325 0.2285 2 0.13 0.25 7.03
0.0325 0.3965 3 0.13 0.25 12.2
0.0325 0.0553 4 0.13 0.25 1.7
0.0325 0.3250 5 0.13 0.25 10
1.133 Total Volume Bekisting (m2)
TIPE B2B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0325 0.3019 1 0.13 0.25 9.29
0.0325 0.0975 2 0.13 0.25 3
0.0325 0.1300 3 0.13 0.25 4
0.0325 0.0517 4 0.13 0.25 1.59
0.581 Total Volume Bekisting (m2)
TIPE B3A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.039 0.1326 1 0.13 0.3 3.4
0.039 0.117 2 0.13 0.3 3
0.039 0.21606 3 0.13 0.3 5.54
0.039 0.156 4 0.13 0.3 4
0.039 0.0975 5 0.13 0.3 2.5
0.039 0.25506 6 0.13 0.3 6.54
0.974 Total Volume Bekisting (m2)
TIPE B3B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.039 0.117 1 0.13 0.3 3
0.039 0.20826 2 0.13 0.3 5.34
0.039 0.2262 3 0.13 0.3 5.8
0.551 Total Volume Bekisting (m2)
TIPE B4A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0455 0.48594 1 0.13 0.35 10.68
0.0455 0.182 2 0.13 0.35 4
0.668 Total Volume Bekisting (m2)
TIPE B4B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0455 0.1365 1 0.13 0.35 3
0.0455 0.314405 2 0.13 0.35 6.91
0.0455 0.23842 3 0.13 0.35 5.24
0.0455 0.3185 4 0.13 0.35 7
1.008 Total Volume Bekisting (m2)
TIPE B5B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.07 0.3731 1 0.2 0.35 5.33
0.07 0.9709 2 0.2 0.35 13.87
0.07 0.406 3 0.2 0.35 5.8
1.750 Total Volume Bekisting (m2)
TIPE 6A
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.08 0.6832 1 0.2 0.4 8.54
0.683 Total Volume Bekisting (m2)
TIPE 6B
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.08 0.4264 1 0.2 0.4 5.33
0.08 0.4264 2 0.2 0.4 5.33
0.853 Total Volume Bekisting (m2)
TIPE BC 1
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.024 0.0816 1 0.12 0.2 3.4
0.024 0.237192 2 0.12 0.2 9.883
0.319 Total Volume Bekisting (m2)
TIPE BC 2
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.03 0.09 1 0.12 0.25 3
0.090 Total Volume Bekisting (m2)
PELAT LANTAI
2. BEKISTING
Dimensi (m)
Volume (m3) Nama
Panjang Lebar Tinggi
1.588 4.2 3.15 0.12
R. Pembantu
0.756 2 3.15 0.12
0.059 Kanopi Jend 1.17 0.5 0.1
0.756 3.15 2 0.12
Teras Belak
0.713 6.6 0.9 0.12
0.115 Kanopi Jend 0.5 2.3 0.1
5.986 Bagian 1 8.6 5.8 0.12
3.758 Bagian 2 5.4 6.8 0.12
0.396 Bagian 3 (B 2.2 1.5 0.12
3.226 Bagian 4 6.4 4 0.12
1.426 Bagian 5 5.4 2.2 0.12
0.374 3 1.22 0.12
Bagian 6
0.428 3.33 0.5 0.12
1.757 3.5 4.184 0.12
Bagian 7 (d
0.273 4.549 0.5 0.12
0.114 Kanopi Dep 1.9 0.5 0.12
21.723 Total Volume Bekisting (m2)
RING BALOK
N 2. BEKISTING
TIPE RB 1
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.026 0.0572 1 0.13 0.2 2.2
m3) 0.0572 Total Volume Bekisting (m2)
TIPE RB 2
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0325 0.065 1 0.13 0.25 2
0.0325 0.072 2 0.13 0.25 2.2
0.0325 0.059 3 0.13 0.25 1.8
0.0325 0.130 4 0.13 0.25 4
0.0325 0.072 5 0.13 0.25 2.2
0.0325 0.072 6 0.13 0.25 2.2
0.0325 0.072 7 0.13 0.25 2.2
0.0325 0.111 8 0.13 0.25 3.4
0.0325 0.098 9 0.13 0.25 3
0.0325 0.073 10 0.13 0.25 2.25
0.0325 0.102 11 0.13 0.25 3.15
0.0325 0.051 12 0.13 0.25 1.575
0.0325 0.051 13 0.13 0.25 1.575
0.0325 0.051 14 0.13 0.25 1.575
0.0325 0.073 15 0.13 0.25 2.25
0.0325 0.124 16 0.13 0.25 3.825
0.0325 0.124 17 0.13 0.25 3.825
0.0325 0.124 18 0.13 0.25 3.825
0.0325 0.098 19 0.13 0.25 3
0.0325 0.325 20 0.13 0.25 10
m3) 1.945 Total Volume Bekisting (m2)
TIPE RB 3
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.039 0.2496 1 0.13 0.3 6.4
0.039 0.1326 2 0.13 0.3 3.4
0.039 0.195 3 0.13 0.3 5
0.039 0.195 4 0.13 0.3 5
0.039 0.195 5 0.13 0.3 5
0.039 0.0858 6 0.13 0.3 2.2
0.039 0.2106 7 0.13 0.3 5.4
0.039 0.351 8 0.13 0.3 9
0.039 0.234 9 0.13 0.3 6
m3) 1.849 Total Volume Bekisting (m2)
TIPE RB 4
Dimensi (m)
Luas (m2) Volume (m3) No
Lebar Tinggi Panjang
0.0455 0.2639 1 0.13 0.35 5.8
0.0455 0.273 2 0.13 0.35 6
0.0455 0.2912 3 0.13 0.35 6.4
m3) 0.828 Total Volume Bekisting (m2)
PELAT ATAP
2. BEKISTING
Dimensi (m)
Volume (m3) AS Sisi Bekisting
Panjang Lebar Tinggi
Panjang : 1G-7G
2.200 10 2.2 0.1 1
Lebar : F1-G1
Panjang : A3-C3
1.188 5.4 2.2 0.1 1
Lebar : 3A-4A
Panjang : 4A-7A
0.914 5.8 1.575 0.1 1
Lebar : A4-B'4
0.345 1.15 3 0.1 1
Bagian Depan
0.415 4.15 1 0.1 1
0.095 Kanopi Jendela 1 1.9 0.5 0.1 1
0.095 Kanopi Jendela 2 1.9 0.5 0.1 1
0.095 Kanopi Jendela 3 1.9 0.5 0.1 1
5.347 Total Volume Bekisting Pelat Atap (m2)
TANGGA
1. BEKISTING
Detail Tangga
Anak Tangga = 4.800 m
Bordes T1 = 0.250 m
T2 = 0.100 m
L= 0.130 m
Plat Bordes = 3.300 m2
Balok Bordes = 3.552 m2
Total = 6.852 m2
Tebal Pelat = 0.100 m
Lebar Tangga = 1.000 m
Pelat = 14.095 m2
Total Vol. Bekisting 20.947 m2
PEKERJAAN BETON
TIE BEAM
TIPE TB 1
Nama As
Nama As Sisi Bekisting Luas (m2)
TB 1 4D-5D
4D-5D 2 0.72 4D'-5D'
4D'-5D' 2 0.72
Total (Kg)
me Bekisting (m2) 1.44
TIPE TB 2A
Nama As
Nama As Sisi Bekisting Luas (m2)
F1-G1
F1-G1 2 1.1000 C2-D1
TB 2A
C2-D1 2 1.5600 F3'-G3'
F3'-G3' 2 1.1000 F4-G4
F4-G4 2 1.1000 A5-B5
A5-B5 2 1.5750
Total (Kg)
me Bekisting (m2) 6.435
TIPE TB 2B
Nama As
Nama As Sisi Bekisting Luas (m2)
D1-F1
D1-F1 2 1.7000 C3-D3
C3-D3 2 1.5000 C4-D4
C4-D4 2 1.5000 B7-C7
TB 2B
B7-C7 2 1.1250 A7-B7
A7-B7 2 1.5750 GB-7B
GB-7B 2 1.5000 3A-4A
3A-4A 2 1.1000 4A-5A
4A-5A 2 0.9000 6A-7A
6A-7A 2 1.5000
Total (Kg)
me Bekisting (m2) 12.400
TIPE TB 3A
Nama As
Nama As Sisi Bekisting Luas (m2)
C5-D5
C5-D5 2 1.8000 TB 3A A2-C2
A2-C2 2 3.2400 2A-3A
2A-3A 2 0.9000 5G-7G
5G-7G 2 2.4000
Total (Kg)
Total (Kg)
me Bekisting (m2) 8.340
TIPE TB 4
Nama As
Nama As Sisi Bekisting Luas (m2)
TB 4 E7-G7
E7-G7 2 2.8000 C7-E7
C7-E7 2 3.2200
Total (Kg)
me Bekisting (m3) 6.020
TIPE TB 5A
Nama As
Nama As Sisi Bekisting Luas (m2)
1G-3'G
1G-3'G 2 1.0290 3'G-4G
3'G-4G 2 1.8900 4G-5G
4G-5G 2 1.2600 TB 5A 1F-3'F
1F-3'F 2 1.0290 3'F-4F
3'F-4F 2 1.8900 1'G-1G
1'G-1G 2 0.7000 1D-3D
1D-3D 2 1.4000 3D-4D
3D-4D 2 1.5400 Total (Kg)
me Bekisting (m3) 10.738
KOLOM
K1 Lantai 1
K1 Tul. Sengkang
Jumlah Sisi Bekisting Luas (m2)
118.62
15 4 18.711 Total (Kg) 351.11
5 4 12.557 35.111
Total (/10Kg)
me Bekisting (m2) 31.268 46.885
K2A
Lantai 1
Jumlah Sisi Bekisting Luas (m2)
K2A Tul. Sengkang
18 4 51.710 169.93
17 4 49.161 Total (Kg) 448.92
me Bekisting (m2) 100.871 44.892
Total (/10Kg)
K2B 87.546
BALOK
2. BEKISTING 2.
TIPE B1 Nama As
As 9
Nama As Sisi Bekisting Luas (m2)
As 10
B1
As 9 3 1.6377 As G
As 10 3 1.6377
Total (Kg)
As G 3 7.9182
me Bekisting (m2) 11.194
TIPE B2A
Nama As
Nama As Sisi Bekisting Luas (m2)
As 9
As 9 3 2.4822 AS 10
AS 10 3 4.4289 As A
B2A
As A 3 7.686 AS D
AS D 3 1.071 As G
As G 3 6.3
Total (Kg)
me Bekisting (m2) 21.968
TIPE B2B
Nama As
Nama As Sisi Bekisting Luas (m2)
As 1
As 1 3 5.8527 As 3
As 3 3 1.8900 B2B As D
As D 3 2.5200 AS G
AS G 3 1.0017
Total (Kg)
me Bekisting (m2) 11.264
TIPE B3A
Nama As
Nama As Sisi Bekisting Luas (m2)
As 1
As 1 3 2.482 AS 2
AS 2 3 2.19 As 4
As 4 3 4.0442 B3A As A
As A 3 2.92 As C
As C 3 1.825 As D
As D 3 4.7742
Total (Kg)
me Bekisting (m2) 18.235
TIPE B3B
Nama As
Nama As Sisi Bekisting Luas (m2)
As 1
As 1 3 2.19 As 5
B3B
As 5 3 3.8982 As A
As A 3 4.234
Total (Kg)
me Bekisting (m2) 10.322
TIPE B4A
Nama As
Nama As Sisi Bekisting Luas (m2)
As 2
As 2 3 8.8644 B4A AS G
AS G 3 3.32
Total (Kg)
me Bekisting (m2) 12.184
TIPE B4B
Nama As
Nama As Sisi Bekisting Luas (m2)
As 4
B4B
As 4 3 2.49 As 7
As 7 3 5.7353 B4B As C
As C 3 4.3492 AS G
AS G 3 5.81
Total (Kg)
me Bekisting (m2) 18.385
TIPE B5B
Nama As
Nama As Sisi Bekisting Luas (m2)
As 3
As 3 3 4.797 B5B As 7
As 7 3 12.483 AS C
AS C 3 5.22 Total (Kg)
me Bekisting (m2) 22.500
TIPE 6A
Nama As
Nama As Sisi Bekisting Luas (m2)
B6A As 5
As 5 3 8.54 Total (Kg)
me Bekisting (m2) 8.540
TIPE 6B
Nama As
Nama As Sisi Bekisting Luas (m2)
As 3
B6B
As 3 3 5.33 As 4
As 4 3 5.33 Total (Kg)
me Bekisting (m2) 10.66
TIPE BC 1
Nama As
Nama As Sisi Bekisting Luas (m2)
As 1
As 1 3 1.768 BC1 As 7
As 7 3 5.13916
Total (Kg)
me Bekisting (m2) 6.90716
TIPE BC 2
Nama As
Nama As Sisi Bekisting Luas (m2)
As 7
BC2
As 7 3 1.86
Total (Kg)
me Bekisting (m2) 1.86
EKISTING
Sisi Bekisting Luas (m2)
1 13.230
1 6.300
1 0.585
1 6.300
1 5.940
1 1.150
1 49.880
1 36.720
1 3.300
1 25.600
1 11.880
1 3.660
1 1.665
1 14.644
1 2.275
1 0.950
ting (m2) 184.079
NG BALOK
2. BEKISTING 3. PEMB
TIPE RB 1 Nama As
RB 1
Nama As Sisi Bekisting Luas (m2) 3B-4B
3B-4B 2 0.88
Total (Kg)
me Bekisting (m2) 0.88
TIPE RB 2
Nama As Sisi Bekisting Luas (m2)
Nama As
1G-3G 2 1.000 1G-3G
3G-4G 2 1.100 3G-4G
4G-5G 2 0.900 4G-5G
5G-7G 2 2.000 5G-7G
F7-G7 2 1.100 F7-G7
F5-G5 2 1.100 F5-G5
F2-G2 2 1.100 F2-G2
D1-F1 2 1.700 D1-F1
C1-D1 2 1.500 C1-D1
B3-C3 2 1.125 RB 2 B3-C3
RB 2
A3-B3 2 1.575 A3-B3
A4-B'4 2 0.788 A4-B'4
A6-B'6 2 0.788 A6-B'6
A7-B'7 2 0.788 A7-B'7
B3-C3 2 1.125 B3-C3
B'4-C4 2 1.913 B'4-C4
B'6-C6 2 1.913 B'6-C6
B'7-C7 2 1.913 B'7-C7
C5-D5 2 1.500 C5-D5
1F-7F 2 5.000 1F-7F
me Bekisting (m2) 29.925
Total (Kg)
TIPE RB 3
Nama As Sisi Bekisting Volume (m3)
Nama As
C7-F7 2 3.84 C7-F7
D5-F5 2 2.04 D5-F5
5E-7E 2 3 5E-7E
5D-7D 2 3 5D-7D
RB 3
5C-7C 2 3 5C-7C
3C-4C 2 1.32 3C-4C
A4-C4 2 3.24 A4-C4
3A-7A 2 5.4 3A-7A
1C-4C 2 3.6 1C-4C
me Bekisting (m2) 28.440
Total (Kg)
TIPE RB 4
Nama As Sisi Bekisting Volume (m3)
Nama As
4B'-7B' 2 4.06 4B'-7B'
RB 4
1C-5C 2 4.2 1C-5C
C3'-F3' 2 4.48 C3'-F3'
me Bekisting (m2) 12.740
Total (Kg)
ELAT ATAP
Luas (m2)
22
11.88
9.135
3.45
4.15
0.95
0.95
0.95
53.465
TANGGA
3. REKAPITULASI TULANGAN
3. REKAPITULASI TULANGAN
Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
232.49 39.80 77.94
351.11 117.74
35.111 11.774
46.885
Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
278.99 161.53 265.01
448.92 426.53
44.892 42.653
87.546
Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
69.75 19.00 46.77
98.07 65.77
9.807 6.577
16.384
Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
93.00 29.83 93.53
122.64 123.36
12.264 12.336
24.600 Volume Besi Beton Polos Untuk Kolom (K
Volume Besi Beton Ulir Untuk Kolom (Kg)
Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
82.29 25.50 82.76
107.63 108.26
10.763 10.826
21.588
2. REKAPITULASI TULANGAN
Lantai 1 Lantai 2
Tul. Pokok Tul. Sengkang Tul. Pokok
198.50 20.60 105.09
237.40 125.69
23.740 12.569
36.309
NO URUTAN PEKERJAAN
1 2
D
D.1 Pekerjaan Tie Beam
D.1.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.1.2 Pembesian 10 Kg dengan besi ulir
D.1.3 Pembesian 10 Kg dengan besi polos
D.1.4 Pemasangan 1 m2 Bekisting untuk tie beam
D.2 Pekerjaan Kolom
D.2.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.2.2 Pembesian 10 Kg dengan besi ulir
D.2.3 Pembesian 10 Kg dengan besi polos
D.2.4 Pemasangan 1 m2 Bekisting untuk kolom
D.3 Pekerjaan Balok
D.3.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.3.2 Pembesian 10 Kg dengan besi ulir
D.3.3 Pembesian 10 Kg dengan besi polos
D.3.4 Pemasangan 1 m2 Bekisting untuk balok
D.4 Pekerjaan Pelat Lantai
D.4.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.4.2 Pembesian 10 Kg dengan besi polos
D.3.4 Pemasangan 1 m2 Bekisting untuk pelat lantai
D.5 Pekerjaan Ring Balok
D.5.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.5.2 Pembesian 10 Kg dengan besi polos
D.5.3 Pemasangan 1 m2 Bekisting untuk ring balok
D.6 Pekerjaan Pelat Atap
D.6.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.6.2 Pembesian 10 Kg dengan besi polos
D.6.3 Pemasangan 1 m2 Bekisting untuk pelat atap
D.7.1 Pekerjaan Tangga
D.7.1 Pekerjaan Pembuatan Beton Mutu K-225 / f'c = 19,3 Mpa
D.7.2 Pembesian 10 Kg dengan besi polos
D.7.3 Pemasangan 1 m2 Bekisting untuk tangga
TOTAL
No Tenaga Kerja
1 2
1 Pekerja
2 Tukang Batu
3 Tukang Kayu
4 Kepala Tukang Batu
5 Kepala Tukang Kayu
6 Mandor
TOTAL
No Bahan
1 2
1 Semen Portland
2 Pasir Beton
3 Kerikil
4 Air
5 Besi Beton Ulir
6 Kawat Beton
7 Besi Beton Polos
8 Kayu Kelas III (Papan Albasia)
9 Paku 5-10 cm
10 Minyak Bekisting
11 Paku 8-12 cm
12 Balok Kayu Kelas II (Balok Albasia)
13 Triplek 9 mm 120 x 240
14 Dolken Kayu Ø 8-10 cm panj. 4m
TOTAL
RENCANA ANGGARAN BIAYA PEKER
Rp 2,497,652.07 Rp 3,239,391.90
Rp 1,480,064.68 Rp 1,667,979.21
Rp 6,093,842.21 Rp 7,018,634.29
Rp 3,984,883.73 Rp 7,825,980.41
Rp 7,934,918.70 Rp 10,291,389.93
Rp 5,672,020.19 Rp 6,392,161.00
Rp 23,054,997.62 Rp 26,553,788.41
Rp 51,418,027.23 Rp 80,017,815.97
Rp 6,231,319.88 Rp 8,081,865.12
Rp 3,956,557.34 Rp 4,458,896.60
Rp 13,026,560.14 Rp 15,003,450.77
Rp 29,752,767.14 Rp 46,301,882.31
Rp 14,778,152.89 Rp 19,166,892.50
Rp 16,269,736.67 Rp 18,738,806.76
Rp 54,547,061.51 Rp 74,325,928.18
Rp 3,183,117.31 Rp 4,128,423.07
Rp 9,318,245.67 Rp 10,732,368.23
Rp 5,895,571.50 Rp 11,989,533.66
Rp 3,637,197.22 Rp 4,717,353.29
Rp 6,085,920.90 Rp 7,009,510.84
Rp 10,496,516.13 Rp 15,022,649.17
Rp 2,240,571.99 Rp 2,905,965.50
Rp 3,886,294.48 Rp 4,476,072.52
Rp 3,715,021.39 Rp 5,488,344.48
Rp 289,157,018.57 Rp 395,555,084.13
TIE BEAM (TB1 15x20)
Tumpuan 3 Ø8-10
Tumpuan 3 Ø8-10
Lapangan 3 Ø8-15
Tul. Tumpuan 3 12
Tul. Lapangan 3 12
Tul. Lapangan 3 12
Tumpuan 3 Ø8-10
Lapangan 3 Ø8-15
Tumpuan 4 Ø8-10
Lapangan 4 Ø8-15
Lapangan 4 Ø8-15
Tul. Tumpuan 3 12
Tumpuan 4 Ø8-10
Lapangan 4 Ø8-15
Tul. Tumpuan 4 12
Tul. Tumpuan 4 12
Tul Lapangan 4 12
Tumpuan 1 Ø8-10
Lapangan 1 Ø8-15
Tumpuan 2 Ø8-10
Lapangan 2 Ø8-15
Tul. Tumpuan 1 13
Tul. Lapangan 1 13
Tul. Tumpuan 2 13
Tul. Lapangan 2 13
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
a b c
K1 (13X20)
Sengkang Ø8 -100
K2A (13X25)
Sengkang Ø8 -100
Sengkang Ø8 -100
Lantai 1
3.78 0.07 0.19
K2B (13X25)
Sengkang Ø8 -100
Sengkang Ø8 -150
K3 (13X30)
Sengkang Ø8 -150
Sengkang Ø8 -150
K4A (13X35)
Sengkang Ø8 -150
Sengkang Ø8 -150
K4B (13X35)
Sengkang Ø8 -150
Sengkang Ø6 -150
KP (13X13)
Sengkang Ø6 -150
Dimensi (m)
Panjang Tul (m) Jumlah (bh) Berat Tul (Kg/m) Volume (Kg)
c
15 118.62
15 232.491
Ruang Pembantu
5 39.80
5 77.943
18 169.93
Kanopi Jendela
18 278.989
17 161.53
Teras Belakang
17 265.006
3 28.32
3 28.32
3 69.747
Kanopi Jendela
2 19.00
2 46.766
Bagian 1
4 29.64
4 92.996 Bagian 2
4 92.996 Bagian 2
4 29.83
Bagian 3 (Bordes)
4 93.532
3 25.33
Bagian 4
3 82.293
3 25.50
3 25.50
Bagian 5
3 82.761
4 29.64
4 146.299
Bagian 6
4 29.83
4 147.131
19 38.90
Bagian 7 (Depan)
19 198.500
10 20.60
10 105.090
Kanopi Depan
10 105.090
Kanopi Depan
PELAT LANTAI
Dimensi (m)
Gambar Tulangan Bentang (m)
a b c
Tul Memanjang Ø8 -150
2 1.94 0.048 -
2 1.94 0.048 -
Panjang Tul (m) Jumlah (bh) Berat Tul (Kg/m) Volume (Kg)
1571.955
157.196
Nama As Gambar Tulangan
Tul Memanjang Ø8 -150
F1-G1
1G-7G
A3-C3
3A-4A
4A-7A
4A-7A
A4-B'4
Bagian Depan
Tul Memanjang Ø8 -150
Kanopi Jendela
Kanopi Jendela
Kanopi Jendela
Kanopi Jendela
PELAT ATAP
Dimensi (m)
Gambar Tulangan Bentang (m)
a b c
Tul Memanjang Ø8 -150
10 9.94 0.048 -
3 2.94 0.048 -
1 0.94 0.048 -
Tul Memanjang Ø8 -150
Panjang Tul (m) Jumlah (bh) Berat Tul (Kg/m) Volume (Kg)
588.012
58.801
RIN
Tumpuan 2 Ø8-10
Lapangan 2 Ø8-15
Tumpuan 4 Ø8-10
Lapangan 4 Ø8-15
Tumpuan 3 Ø8-10
Lapangan 3 Ø8-15
Tumpuan 10 Ø8-10
Lapangan 10 Ø8-15
Tumpuan 5 Ø8-10
Lapangan 5 Ø8-15
Tumpuan 9 Ø8-10
Lapangan 9 Ø8-15
Tumpuan 6 Ø8-10
Lapangan 6 Ø8-15
Tumpuan 6 Ø8-10
Lapangan 6 Ø8-15
Tul. Bawah 2 12
Tul. Atas 2 12
Tul. Bawah 4 12
Tul. Atas 4 12
Tul. Bawah 3 12
Tul. Atas 3 12
Tul. Bawah 10 12
Tul. Atas 10 12
Tul. Tumpuan 5 12
Tul. Lapangan 5 12
Tul. Tumpuan 9 12
Tul. Lapangan 9 12
Tul. Tumpuan 6 12
Tul. Lapangan 6 12
Tul. Tumpuan 6 12
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m)
a b c
2.752 Tumpuan
1.764 Lapangan
Volume (Kg)
Tumpuan
2.920
Lapangan
1.865
3.163
Tumpuan
2.028
2.028
Lapangan
2.677
Tumpuan
1.703
Lapangan
5.353
Tumpuan
3.488
Lapangan
4.623
Tumpuan
3.001
Lapangan
3.001
Lapangan
4.136
Tumpuan
2.677
Lapangan
Tumpuan
2.068
Lapangan
4.319
Tumpuan
2.798
Lapangan
Lapangan
2.403
Tumpuan
1.521
Lapangan
5.140
Tumpuan
3.346
Lapangan
12.653
8.354 Tumpuan
Volume (Kg)
Lapangan
9.616
Lapangan
9.616
Tumpuan
6.316
Lapangan
5.374
Tumpuan
3.488
Lapangan
7.636
Tumpuan
4.996
Lapangan
3.677
Lapangan
3.677
Tumpuan
2.357
Lapangan
8.202
Tumpuan
5.374
Lapangan
13.293
8.767
Tumpuan
9.050
Lapangan
Lapangan
5.939
Tumpuan
Volume (Kg)
Lapangan
9.992
Tumpuan
6.554
Lapangan
10.314
6.769
Tumpuan
10.959
Lapangan
7.198
Lapangan
7.198
Tumpuan
Volume (Kg)
Lapangan
4.574
Volume (Kg)
Tumpuan
4.217
4.217
Lapangan
4.574
Tumpuan
4.574
3.861
Lapangan
3.861
Lapangan
3.861
7.785
Tumpuan
7.785
6.715
Lapangan
6.715
Tumpuan
6.001
6.001
Lapangan
4.663
6.269
Tumpuan
6.269
Lapangan
3.459
Lapangan
3.459
Tumpuan
7.473
7.473
Lapangan
18.489
18.489
Tumpuan
Volume (Kg)
3.968
Lapangan
3.411
12.424
Tumpuan
12.424
2.630
Lapangan
2.073
Lapangan
2.073
Tumpuan
7.072
3.343
Lapangan
2.787
9.926
Tumpuan
2.094
Lapangan
1.538
4.931
Tumpuan
4.931
3.522
Lapangan
3.522
Lapangan
2.965
Tumpuan
10.640
5.127
Lapangan
4.571
17.062
17.062
3.789
3.233
11.710
11.710
Volume (Kg)
7.578
11.532
11.532
7.757
11.889
11.889
8.114
12.602
12.602
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Dimensi (m)
Bentang (m) Ø Panjang (m) Jumlah (bh)
a b c
Tul. Bawah
0.395 2.507
Tul. Atas
Tul. Bawah
0.395 1.778
Tul. Atas
0.395 10.558
Tu. Pokok B2A Gambar
Tul. Bawah
0.395 7.816
Tul. Atas
Tul. Bawah
Berat (kg/m) Volume (Kg)
Tul. Atas
0.395 3.682
Tul. Bawah
Tul. Bawah
Tul. Atas
0.395 2.640
Tul. Bawah
0.395 6.188
Tul. Atas
Tul. Bawah
0.395 4.520
Tul. Atas
0.395 10.382
Tul. Tumpuan
Tul. Tumpuan
0.395 7.665
Tul. Lapangan
0.395 1.277
Tul. Tumpuan
0.395 1.277
Tul. Tumpuan
Tul. Tumpuan
0.395 8.597
Tul. Lapangan
0.395 8.021
Tul. Tumpuan
Tul. Lapangan
0.395 5.894
Tul. Pokok Atas
Tul. Tumpuan
Tul. Tumpuan
0.395 2.068
Tul. Tumpuan
0.395 2.068
Tul. Lapangan
0.395 3.731
Tul. Pokok Atas
0.395 2.677
Tul. Pokok B3A Gambar
Tul. Tumpuan
0.395 1.776
Tul. Tumpuan
Tul. Lapangan
0.395 1.211
0.395 3.244
Tul. Tumpuan
Tul. Tumpuan
0.395 2.312
0.395 2.312
Tul. Lapangan
Tul. Tumpuan
0.395 2.068
Tul. Tumpuan
0.395 4.980
Tul. Lapangan
0.395 3.613
Tul. Pokok Bawah
Tul. Tumpuan
0.395 3.731
Tul. Tumpuan
Tul. Lapangan
0.395 2.677
0.395 2.514
Tul. Pokok Bawah
Tul. Tumpuan
0.395 1.764
Tul. Tumpuan
Tul. Lapangan
0.395 5.791
Tul. Tumpuan
Tul. Tumpuan
0.395 3.394
Tul. Lapangan
Tul. Tumpuan
Tul. Lapangan
0.395 4.058
0.395 6.033
Tul. Pokok Bawah
Tul. Tumpuan
0.395 4.384
Tul. Lapangan
Tul. Tumpuan
0.395 8.928
Tul. Lapangan
0.395 8.928
0.395 4.942
Tul. Pokok Bawah
0.395 3.546
Tul. Tumpuan
Tul. Lapangan
0.395 3.868
0.395 2.740
Tul. Pokok Bawah
Tul. Tumpuan
0.395 8.069
Tul. Tumpuan
Tul. Lapangan
0.395 5.890
Tul. Tumpuan
0.395 4.545
Tul. Lapangan
0.395 8.165
Tul. Pokok Atas
0.395 5.963
Tul. Tumpuan
0.395 5.409
Tul. Tumpuan
0.395 5.409
Tul. Lapangan
0.395 18.214
Tul. Pokok Atas
Tul. Tumpuan
Tul. Lapangan
0.395 8.056
0.395 5.853
Tul. Pokok Bawah
Tul. Tumpuan
0.395 12.708
Tul. Lapangan
0.395 8.245
Tul. Lapangan
0.395 5.975
Tul. Pokok Bawah
Tul. Lapangan
0.395 2.612
0.395 1.861
Tul. Pokok Bawah
0.395 6.846
Tul. Tumpuan
Tul. Lapangan
0.395 5.037
0.395 5.037
Tul. Pokok Atas
Tul. Tumpuan
Tul. Lapangan
0.395 2.001
Tul. Bawah
Tul. Atas
Tul. Bawah
Tul. Atas
Tul. Atas
Tul. Tumpuan
Tul. Bawah
Tul. Atas
Dimensi (m)
Gambar Bentang (m) Ø
a b c
Dimensi (m)
Gambar Bentang (m) Ø
a b c
Dimensi (m)
Gambar Bentang (m) Ø
a b c
3 12 0.99 0.072 -
3 12 1.98 0.072 -
4 12 1.24 0.072 -
4 12 2.48 0.072 -
Dimensi (m)
Gambar Bentang (m) Ø
a b c
3 12 0.99 0.072 -
3 12 1.98 0.072 -
4 12 1.24 0.072 -
4 12 2.48 0.072 -
Dimensi (m)
Gambar Bentang (m) Ø
a b c
3 12 1.98 0.072 -
Dimensi (m)
Gambar Bentang (m) Ø
a b c
4 12 1.24 0.072 -
4 12 2.48 0.072 -
Dimensi (m)
Gambar Bentang (m) Ø
a b c
3 12 1.98 0.072 -
7 12 3.98 0.072 -
Dimensi (m)
Gambar Bentang (m) D
a b c
Dimensi (m)
Gambar Bentang (m) D
a b c
Dimensi (m)
Gambar Bentang (m) D
a b c
Dimensi (m)
Gambar Bentang (m) Ø
a b c
Dimensi (m)
Gambar Bentang (m) Ø
a b c
1 12 3.498 0.281
1 8 0.424 0.281
1 12 3.144 0.281
1 12 0.94 0.072
1 12 0.94 0.072
1 12 3.223 0.156
1 12 3.206 0.217
Dimensi (m)
Panjang (m) Jumlah (bh) Berat (kg/m) Volume (Kg)
c d
26.095
Per 10Kg)
GGA
Dimensi (m)
Gambar Tulangan Bordes Tangga Bentang (m) Ø
a b c
11.453
ANALISA HARGA SATUAN PEKERJ
Harga Satuan (R
NO URAIAN KOEF SAT
Upah
1 2 3 4 5
E PEKERJAAN DINDI
E.1 Pemasangan 1 m2 Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 4 PP
Pekerja 0.6 Oh Rp 95,600.00
Tukang Batu 0.2 Oh Rp 109,300.00
Kepala Tukang Batu 0.02 Oh Rp 120,000.00
Mandor 0.03 Oh Rp 131,000.00
Bata Merah 140 Buah -
Semen Portland 26.55 Kg -
Pasir Pasang 0.093 m3 -
JUMLAH
E.2 Pemasangan 1 m2 Plesteran 1 SP : 4 PP Tebal 15 mm
Pekerja 0.3 Oh Rp 95,600.00
Tukang Batu 0.15 Oh Rp 109,300.00
Kepala Tukang Batu 0.015 Oh Rp 120,000.00
Mandor 0.015 Oh Rp 131,000.00
Semen Portland 6.24 Kg -
Pasir Pasang 0.024 m3 -
JUMLAH
E.3 Pemasangan 1 m2 Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 2 PP
Pekerja 0.6 Oh Rp 95,600.00
Tukang Batu 0.2 Oh Rp 109,300.00
Kepala Tukang Batu 0.02 Oh Rp 120,000.00
Mandor 0.03 Oh Rp 131,000.00
Bata Merah 140 Buah -
Semen Portland 43.5 Kg -
Pasir Pasang 0.08 m3 -
JUMLAH
E.4 Pemasangan 1 m2 Plesteran 1 SP : 2 PP Tebal 15 mm
Pekerja 0.3 Oh Rp 95,600.00
Tukang Batu 0.15 Oh Rp 109,300.00
Kepala Tukang Batu 0.015 Oh Rp 120,000.00
Mandor 0.015 Oh Rp 131,000.00
Semen Portland 10.224 Kg -
Pasir Pasang 0.02 m3 -
JUMLAH
E.5 Pemasangan 1 m2 Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C)
Pekerja 0.9 Oh Rp 95,600.00
Tukang Batu 0.45 Oh Rp 109,300.00
Kepala Tukang Batu 0.045 Oh Rp 120,000.00
Mandor 0.045 Oh Rp 131,000.00
Keramik Dinding 20x25 Roman Polos 20 Buah -
Semen Portland 9.3 Kg -
Pasir Pasang 0.018 m3 -
Semen Warna 1.94 Kg -
JUMLAH
E.6 Pemasangan 1 m2 Acian
Pekerja 0.2 Oh Rp 95,600.00
Tukang Batu 0.1 Oh Rp 109,300.00
Kepala Tukang Batu 0.01 Oh Rp 120,000.00
Mandor 0.01 Oh Rp 131,000.00
Semen Portland 3.25 Kg -
JUMLAH
SATUAN PEKERJAAN DINDING
- - Rp 28,680.00 - - Rp 28,680.00
- - Rp 16,395.00 - - Rp 16,395.00
- - Rp 1,800.00 - - Rp 1,800.00
- - Rp 1,965.00 - - Rp 1,965.00
Rp 1,100.00 - - Rp 6,864.00 - Rp 6,864.00
Rp 224,500.00 - - Rp 5,388.00 - Rp 5,388.00
Rp 48,840.00 Rp 12,252.00 - Rp 61,092.00
uran 1 SP : 2 PP
- - Rp 57,360.00 - - Rp 57,360.00
- - Rp 21,860.00 - - Rp 21,860.00
- - Rp 2,400.00 - - Rp 2,400.00
- - Rp 3,930.00 - - Rp 3,930.00
Rp 700.00 - - Rp 98,000.00 - Rp 98,000.00
Rp 1,100.00 - - Rp 47,850.00 - Rp 47,850.00
Rp 224,500.00 - - Rp 17,960.00 - Rp 17,960.00
Rp 85,550.00 Rp 163,810.00 - Rp 249,360.00
- - Rp 28,680.00 - - Rp 28,680.00
- - Rp 16,395.00 - - Rp 16,395.00
- - Rp 1,800.00 - - Rp 1,800.00
- - Rp 1,965.00 - - Rp 1,965.00
Rp 1,100.00 - - Rp 11,246.40 - Rp 11,246.40
Rp 224,500.00 - - Rp 4,490.00 - Rp 4,490.00
Rp 48,840.00 Rp 15,736.40 - Rp 64,576.40
longan C)
- - Rp 86,040.00 - - Rp 86,040.00
- - Rp 49,185.00 - - Rp 49,185.00
- - Rp 5,400.00 - - Rp 5,400.00
- - Rp 5,895.00 - - Rp 5,895.00
Rp 4,675.00 - - Rp 93,500.00 - Rp 93,500.00
Rp 1,100.00 - - Rp 10,230.00 - Rp 10,230.00
Rp 224,500.00 - - Rp 4,041.00 - Rp 4,041.00
Rp 15,000.00 - - Rp 29,100.00 - Rp 29,100.00
Rp 146,520.00 Rp 136,871.00 - Rp 283,391.00
- - Rp 19,120.00 - - Rp 19,120.00
- - Rp 10,930.00 - - Rp 10,930.00
- - Rp 1,200.00 - - Rp 1,200.00
- - Rp 1,310.00 - - Rp 1,310.00
Rp 1,100.00 - - Rp 3,575.00 - Rp 3,575.00
Rp 32,560.00 Rp 3,575.00 - Rp 36,135.00
KEBUTUHA
No Uraian Pekerjaan
1 2
E
E.1 Pemasangan 1 m2 Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 4 PP
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Bata Merah
Semen Portland
Pasir Pasang
No Uraian Pekerjaan
1 2
E.2 Pemasangan 1 m2 Plesteran 1 SP : 4 PP Tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Pasang
No Uraian Pekerjaan
1 2
E.3 Pemasangan 1 m2 Dinding Bata Merah (5x11x22) Tebal 1 Batu Campuran 1 SP : 2 PP
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Bata Merah
Semen Portland
Pasir Pasang
No Uraian Pekerjaan
No Uraian Pekerjaan
1 2
E.4 Pemasangan 1 m2 Plesteran 1 SP : 2 PP Tebal 15 mm
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Pasang
No Uraian Pekerjaan
1 2
E.5 Pemasangan 1 m2 Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Keramik Dinding 20x25 Roman Polos
Semen Portland
Pasir Pasang
Semen Warna
No Uraian Pekerjaan
1 2
E.6 Pemasangan 1 m2 Acian
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
KEBUTUHAN BAHAN DAN TENAGA KERJA PEKERJAAN DINDING
330.618 - - Rp 31,607,080.80 - -
110.206 - - Rp 12,045,515.80 - -
11.0206 - - Rp 1,322,472.00 - -
16.5309 - - Rp 2,165,547.90 - -
- 77144.2 - - Rp 54,000,940.00 -
- 14629.8465 - - Rp 16,092,831.15 -
- 51.24579 - - Rp 11,504,679.86 -
Jumlah Rp 47,140,616.50 Rp 81,598,451.01 -
Total Rp 128,739,067.51
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
330.618 - - Rp 31,607,080.80 - -
165.309 - - Rp 18,068,273.70 - -
16.5309 - - Rp 1,983,708.00 - -
16.5309 - - Rp 2,165,547.90 - -
- 6876.8544 - - Rp 7,564,539.84 -
- 26.44944 - - Rp 5,937,899.28 -
Jumlah Rp 53,824,610.40 Rp 13,502,439.12 -
Total Rp 67,327,049.52
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
69.2844 - - Rp 6,623,588.64 - -
23.0948 - - Rp 2,524,261.64 - -
2.30948 - - Rp 277,137.60 - -
3.46422 - - Rp 453,812.82 - -
- 16166.36 - - Rp 11,316,452.00 -
- 5023.119 - - Rp 5,525,430.90 -
- 9.23792 - - Rp 2,073,913.04 -
Jumlah Rp 9,878,800.70 Rp 18,915,795.94 -
Total Rp 28,794,596.64
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
14.37 - - Rp 1,373,772.00 - -
7.185 - - Rp 785,320.50 - -
0.7185 - - Rp 86,220.00 - -
0.7185 - - Rp 94,123.50 - -
- 489.7296 - - Rp 538,702.56 -
- 0.958 - - Rp 215,071.00 -
Jumlah Rp 2,339,436.00 Rp 753,773.56 -
Total Rp 3,093,209.56
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
82.37196 - - Rp 7,874,759.38 - -
41.18598 - - Rp 4,501,627.61 - -
4.118598 - - Rp 494,231.76 - -
4.118598 - - Rp 539,536.34 - -
- 1830.488 - - Rp 8,557,531.40 -
- 851.17692 - - Rp 936,294.61 -
- 1.6474392 - - Rp 369,850.10 -
- 177.557336 - - Rp 2,663,360.04 -
Jumlah Rp 13,410,155.09 Rp 12,527,036.15 -
Total Rp 25,937,191.24
Jumlah yang Dibutuhkan Harga Material (Rp)
Upah Bahan Alat Upah Bahan Alat
9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
229.992 - - Rp 21,987,235.20 - -
114.996 - - Rp 12,569,062.80 - -
11.4996 - - Rp 1,379,952.00 - -
11.4996 - - Rp 1,506,447.60 - -
- 3737.37 - - Rp 4,111,107.00 -
Jumlah Rp 37,442,697.60 Rp 4,111,107.00 -
Total Rp 41,553,804.60
PAS. DINDING 1 PC : 4 PS LANTAI 1
PAS. DINDING 1 PC : 4 PS LANTAI 2
PAS. DINDING 1 PC : 2 PS LANTAI 1
PAS. DINDING 1 PC : 2 PS LANTAI 2
4 PS LANTAI 1 PAS. DINDING
4 PS LANTAI 2
2 PS LANTAI 1
VOL
No Plesteran
1 Pas Dinding 1 PC : 4 PS
2 Pas Dinding 1 PC : 2 PS
Total (m2)
Volume Pemasangan Dinding Keramik 2
No As Horizontal
1 C'4-D'4
2 C'5-D'5
3 E10-G10
4 E9-G9
5 A8-B'8
6 A9-B'9
Total Luas
Volume Pemasangan Dinding Keramik 2
No As Horizontal
1 A3-B3
2 B3-C3
3 A4-B4
4 B4-C'4
5 Tambahan
Total Luas
VOLUME PEKERJAAN DINDING
PAS. DINDING 1 PC : 4 PS LANTAI 1
Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
12 3.78 - - 45.36
2 3.43 - - 6.86
2 3.43 J4 1.19 5.67
8 3.43 PB 1.914 25.526
1 3.78 - - 3.78
0.7 3.78 - - 2.646
4.7 3.78 - - 17.766
2.5 3.78 - - 9.45
4.2 3.78 - - 15.876
11 3.78 41.58
8 3.43
6 3.43 20.58
8 3.43 2*J1 2.295 22.85
Total Luas 217.944
PAS. DINDING 1 PC : 4 PS LANTAI 2
Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
11 3.805 - - 41.855
4.2 3.805 - - 15.981
0.5 3.805 - - 1.9025
1.5 3.805 J5 1.088 4.6195
6.8 3.805 25.874
5.8 3.805 P1 2.25 19.819
4 3.805 - - 15.22
Total Luas 125.271
PAS. DINDING 1 PC : 2 PS LANTAI 1
Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
1.8 3 GB 0.196 5.204
1.8 3 P2 1.72 3.68
1.2 3 - - 3.6
1.2 3 P2* 1.72 1.88
2 3 BV 0.36 5.64
2 3 - - 6
Total Luas 26.004
PAS. DINDING 1 PC : 2 PS LANTAI 2
Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
2.2 3 - - 6.6
2.2 3 - - 6.6
1.3 3 P2 1.72 2.18
0.78 3 - - 2.34
Total Luas 17.72
VOLUME ACIAN
Volume (m2)
1102.06
47.9
1149.96
masangan Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C) Lantai 1
Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
1.5 1.8 - - 2.7
1.5 1.8 - - 2.7
4 3 - - 12
4 3 P2 1.72 10.28
1.885 1.8 - - 3.393
1.885 1.8 - - 3.393
Total Luas 34.466
masangan Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C) Lantai 2
Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2) Luas Dinding (m2)
3.15 2.48 3*J7 3 X 0.38 6.672
2.25 2.48 J7 0.38 5.2
3.15 2.48 P2 1.72 6.092
1.65 2.48 - - 4.092
0.6 2.48 - - 1.488
Total Luas 23.544
PERHITUNGAN BANYAKNYA KOLOM LANTAI 1 PAS. BATA 1 PC : 4 PS
Ukuran (m)
Tipe Kolom Jumlah
No b h Tinggi
1 K1 0.13 0.2 3 7
2 K2A 0.13 0.25 3 19
3 K2B 0.13 0.25 3 2
4 K3 0.13 0.3 3 4
5 K4A 0.13 0.35 3 3
6 K4B 0.13 0.35 3 2
7 KP 0.13 0.13 3 10
Total Luas
PERHITUNGAN BANYAKNYA KOLOM LANTAI 2 PAS. BATA 1 PC : 4 PS
Ukuran (m)
Tipe Kolom Jumlah
No b h Tinggi
1 K1 0.13 0.2 3 4
2 K2A 0.13 0.25 3 16
4 K3 0.13 0.3 3 1
7 KP 0.13 0.13 3 4
Total Luas
PERHITUNGAN BANYAKNYA KOLOM LANTAI 1 PAS. BATA 1 PC : 2 PS
Ukuran (m)
Tipe Kolom Jumlah
No b h Tinggi
1 K2A 0.13 0.25 3 4
2 KP 0.13 0.13 3 8
Total Luas
PERHITUNGAN BANYAKNYA KOLOM LANTAI 2 PAS. BATA 1 PC : 2 PS
Ukuran (m)
Tipe Kolom Jumlah
No b h Tinggi
1 K1 0.13 0.2 3 2
2 K2A 0.13 0.25 3 3
3 K2B 0.13 0.25 3 1
5 K4A 0.13 0.35 3 1
7 KP 0.13 0.13 3 3
Total Luas
Volume Pemasangan Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C) Lantai 1
No As Vertikal Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2)
1 4C'-5C' 1.8 1.8 GB 0.196
2 4D'-5D' 1.8 1.8 P2 1.72
3 8A-9A 1.2 1.8 - -
4 8A'-9A' 1.2 1.8 P2* 1.72
5 9E-10E 2 3 - -
6 9G-10G 2 3 - -
Total Luas
Volume Pemasangan Dinding Keramik 20 cm x 25 cm Roman Polos (Golongan C) Lantai 2
No As Vertikal Panjang (m) Tinggi (m) Jenis Kusen Luas Kusen (m2)
1 3A-4A 2.2 2.48
2 3B-4B 2.2 2.48
3 3C-4'C 1.3 2.48 P2 1.72
4 Tambahan 0.78 2.48
Total Luas
NO
TA 1 PC : 4 PS
1
E.1
Luas (m2)
E.2
13.86 E.3
43.32 E.4
4.56 E.5
10.32 E.6
8.64
5.76
15.6
102.06 No
1
TA 1 PC : 4 PS 1
2
3
Luas (m2)
4
7.92
36.48
2.58 No
6.24 1
53.22 1
2
3
4
5
TA 1 PC : 2 PS
Luas (m2)
9.12
12.48
21.6
TA 1 PC : 2 PS
Luas (m2)
3.96
6.84
2.28
2.88
4.68
20.64
Keramik)
Golongan C) Lantai 1
Golongan C) Lantai 2
Tenaga Kerja
2
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Total
Bahan
2
Bata Merah
Semen Portland
Pasir Pasang
Keramik Dinding 20x25 Roman Polos
Semen Warna
Total
RENCANA ANGGARAN BIAYA PEKERJAAN DINDING
Rp 95,600.00 - - Rp 4,110.80 -
Rp 109,300.00 - - Rp 4,699.90 -
Rp 120,000.00 - - Rp 516.00 -
Rp 131,000.00 - - Rp 275.10 -
- Rp 117,500.00 - - Rp 129,250.00
- Rp 283.33 - - Rp 566.66
- Rp 25,000.00 - - Rp 1,500.00
Rp 9,601.80 Rp 131,316.66
ngka Expose Kayu Kelas II
Rp 95,600.00 - - Rp 81,260.00 -
Rp 109,300.00 - - Rp 278,715.00 -
Rp 120,000.00 - - Rp 30,600.00 -
Rp 131,000.00 - - Rp 5,633.00 -
- Rp 9,000,000.00 - - Rp 225,000.00
- Rp 15,000.00 - - Rp 12,000.00
- Rp 25,000.00 - - Rp 750.00
- Rp 120,000.00 - - Rp 120,000.00
- Rp 26,400.00 - - Rp 13,200.00
Rp 396,208.00 Rp 370,950.00
Rp 95,600.00 - - Rp 42,064.00 -
Rp 109,300.00 - - Rp 48,092.00 -
Rp 120,000.00 - - Rp 5,280.00 -
Rp 131,000.00 - - Rp 2,882.00 -
- Rp 1,100,000.00 - - Rp 1,100,000.00
- Rp 55,000.00 - - Rp 55,000.00
- Rp 225,000.00 - - Rp 225,000.00
- Rp 200,000.00 - - Rp 200,000.00
Rp 98,318.00 Rp 1,580,000.00
Rp 95,600.00 - - Rp 42,064.00 -
Rp 109,300.00 - - Rp 48,092.00 -
Rp 120,000.00 - - Rp 5,280.00 -
Rp 131,000.00 - - Rp 2,882.00 -
- Rp 1,800,000.00 - - Rp 3,600,000.00
- Rp 55,000.00 - - Rp 110,000.00
- Rp 225,000.00 - - Rp 225,000.00
- Rp 200,000.00 - - Rp 400,000.00
Rp 98,318.00 Rp 4,335,000.00
Rp 95,600.00 - - Rp 42,064.00 -
Rp 109,300.00 - - Rp 48,092.00 -
Rp 120,000.00 - - Rp 5,280.00 -
Rp 131,000.00 - - Rp 2,882.00 -
- Rp 600,000.00 - - Rp 600,000.00
- Rp 45,000.00 - - Rp 90,000.00
- Rp 25,000.00 - - Rp 25,000.00
- Rp 25,000.00 - - Rp 1,500.00
Rp 50,000.00 - - Rp 50,000.00
Rp 98,318.00 Rp 766,500.00
Rp 95,600.00 - - Rp 62,140.00 -
Rp 109,300.00 - - Rp 71,045.00 -
Rp 120,000.00 - - Rp 7,800.00 -
Rp 131,000.00 - - Rp 4,192.00 -
Rp 642,000.00 - - Rp 963,000.00
Rp 145,177.00 Rp 963,000.00
Rp 95,600.00 - - Rp 1,434.00 -
Rp 109,300.00 - - Rp 16,395.00 -
Rp 120,000.00 - - Rp 1,800.00 -
Rp 131,000.00 - - Rp 104.80 -
- Rp 20,000.00 - - Rp 20,000.00
Rp 19,733.80 Rp 20,000.00
Rp 95,600.00 - - Rp 1,434.00 -
Rp 109,300.00 - - Rp 16,395.00 -
Rp 120,000.00 - - Rp 1,800.00 -
Rp 131,000.00 - - Rp 104.80 -
- Rp 116,600.00 - - Rp 128,260.00
- Rp 25,000.00 - - Rp 1,250.00
Rp 19,733.80 Rp 129,510.00
Rp 95,600.00 - - Rp 1,434.00 -
Rp 109,300.00 - - Rp 16,395.00 -
Rp 120,000.00 - - Rp 1,800.00 -
Rp 131,000.00 - - Rp 104.80 -
- Rp 41,500.00 - - Rp 41,500.00
Rp 19,733.80 Rp 41,500.00
Rp 95,600.00 - - Rp 1,434.00 -
Rp 109,300.00 - - Rp 16,395.00 -
Rp 120,000.00 - - Rp 1,800.00 -
Rp 131,000.00 - - Rp 104.80 -
- Rp 35,000.00 - - Rp 35,000.00
Rp 19,733.80 Rp 35,000.00
Rp 95,600.00 - - Rp 956.00 -
Rp 109,300.00 - - Rp 54,650.00 -
Rp 120,000.00 - - Rp 6,000.00 -
Rp 131,000.00 - - Rp 655.00 -
- Rp 210,000.00 - - Rp 210,000.00
Rp 62,261.00 Rp 210,000.00
Rp 95,600.00 - - Rp 478.00 -
Rp 109,300.00 - - Rp 54,650.00 -
Rp 120,000.00 - - Rp 600.00 -
Rp 131,000.00 - - Rp 327.50 -
- Rp 33,000.00 - - Rp 33,000.00
Rp 56,055.50 Rp 33,000.00
Rp 95,600.00 - - Rp 4,780.00 -
Rp 109,300.00 - - Rp 54,650.00 -
Rp 120,000.00 - - Rp 6,000.00 -
Rp 131,000.00 - - Rp 393.00 -
- Rp 200,000.00 - - Rp 200,000.00
Rp 65,823.00 Rp 200,000.00
Rp 95,600.00 - - Rp 1,434.00 -
Rp 109,300.00 - - Rp 16,395.00 -
Rp 120,000.00 - - Rp 1,800.00 -
Rp 131,000.00 - - Rp 1,048.00 -
- Rp 25,000.00 - - Rp 25,000.00
Rp 20,677.00 Rp 25,000.00
Rp 95,600.00 - - Rp 114,720.00 -
Rp 109,300.00 - - Rp 131,160.00 -
Rp 120,000.00 - - Rp 14,400.00 -
Rp 131,000.00 - - Rp 786.00 -
- Rp 1,600,000.00 - - Rp 1,760,000.00
Rp 261,066.00 Rp 1,760,000.00
Rp)
Jumlah (Rp) No Uraian Pekerjaan
Alat
10 = (3 x 7) 11 = ( 8+9+10) 1 2
F
F.1 Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Jendela Kay
- Rp 573,600.00 Pekerja
- Rp 1,967,400.00 Tukang Kayu
- Rp 216,000.00 Kepala Tukang Kayu
- Rp 39,300.00 Mandor
- Rp 10,200,000.00 Balok Kayu Kamper Samarinda
- Rp 18,750.00 Paku 10 cm
- Rp 15,000.00 Lem Kayu
- Rp 13,030,050.00
- Rp 4,110.80
No Uraian Pekerjaan
- Rp 4,699.90
- Rp 516.00 1 2
- Rp 275.10 F.2 Pembuatan dan Pemasangan 1 m Kusen Alumunium
- Rp 129,250.00 Pekerja
- Rp 566.66 Tukang Khusus Alumunium
- Rp 1,500.00 Kepala Tukang Khusus Alumunium
- Rp 140,918.46 Mandor
Profil Alumunium
- Rp 81,260.00 Skrup Fixer
- Rp 278,715.00 Sealant
- Rp 30,600.00
- Rp 5,633.00
- Rp 225,000.00
No Uraian Pekerjaan
- Rp 12,000.00
- Rp 750.00 1 2
- Rp 120,000.00 F.3 Pembuatan dan Pemasangan 1 m2 Pintu Teakwood Rangkap, Ra
- Rp 13,200.00 Pekerja
- Rp 767,158.00 Tukang Kayu
Kepala Tukang Kayu
- Rp 42,064.00 Mandor
- Rp 48,092.00 Kayu Papan Samarinda
- Rp 5,280.00 Lem Kayu
- Rp 2,882.00 Paku 1" - 2,5"
- Rp 1,100,000.00 Teakwood, t = 4mm , 90 x 220 mm
- Rp 55,000.00 Plat Seng Alumumium
- Rp 225,000.00
- Rp 200,000.00
- Rp 1,678,318.00
No Uraian Pekerjaan
- Rp 42,064.00 1 2
- Rp 48,092.00 F.4 Pemasangan 1 Unit Daun Pintu Alumunium P3
- Rp 5,280.00 Pekerja
- Rp 2,882.00 Tukang Khusus Alumunium
- Rp 3,600,000.00 Kepala Tukang Khusus Alumunium
- Rp 110,000.00 Mandor
- Rp 225,000.00 Daun Pintu Alumunium
- Rp 400,000.00 Engsel Pintu + Baut
- Rp 4,433,318.00 Kunci Pintu
Handle Tarik (BLC AAH8 SS)
- Rp 42,064.00
- Rp 48,092.00
- Rp 5,280.00
No Uraian Pekerjaan
- Rp 2,882.00
- Rp 600,000.00 1 2
- Rp 90,000.00 F.5 Pemasangan 1 Unit Daun Pintu PJ2
- Rp 25,000.00 Pekerja
- Rp 1,500.00 Tukang Khusus Alumunium
- Rp 50,000.00 Kepala Tukang Khusus Alumunium
- Rp 864,818.00 Mandor
Daun Pintu Alumunium
- Rp 62,140.00 Engsel Pintu + Baut
- Rp 71,045.00 Kunci Pintu
- Rp 7,800.00 Handle Tarik
- Rp 4,192.00
- Rp 963,000.00
- Rp 1,108,177.00
No Uraian Pekerjaan
- Rp 1,434.00 1 2
- Rp 16,395.00 F.6 Pemasangan 1 Unit Daun Jendela Alumunium
- Rp 1,800.00 Pekerja
- Rp 104.80 Tukang Khusus Alumunium
- Rp 20,000.00 Kepala Tukang Khusus Alumunium
- Rp 39,733.80 Mandor
Daun Jendela Alumunium
- Rp 1,434.00 Engsel Jendela
- Rp 16,395.00 Slot Jendela
- Rp 1,800.00 Sealant
- Rp 104.80 Accessories
- Rp 128,260.00
- Rp 1,250.00
- Rp 149,243.80
No Uraian Pekerjaan
- Rp 1,434.00 1 2
- Rp 16,395.00 F.7 Pemasangan 1 m2 Pintu Besi
- Rp 1,800.00 Pekerja
- Rp 104.80 Tukang Besi
- Rp 41,500.00 Kepala Tukang Besi
- Rp 61,233.80 Mandor
Pintu Besi + Accessories
- Rp 1,434.00
- Rp 16,395.00
- Rp 1,800.00
No Uraian Pekerjaan
- Rp 104.80
- Rp 35,000.00 1 2
- Rp 54,733.80 F.8 Pemangan 1 Buah Glass Block
Pekerja
- Rp 956.00 Tukang Kayu
- Rp 54,650.00 Kepala Tukang Kayu
- Rp 6,000.00 Mandor
- Rp 655.00 Glass Block
- Rp 210,000.00
- Rp 272,261.00
No Uraian Pekerjaan
- Rp 478.00
- Rp 54,650.00 1 2
- Rp 600.00 F.9 Pemangan 1 m2 Kaca Polos Tebal 5 mm
- Rp 327.50 Pekerja
- Rp 33,000.00 Tukang Kayu
- Rp 89,055.50 Kepala Tukang Kayu
Mandor
- Rp 4,780.00 Kaca Polos Tebal 5mm Asahi
- Rp 54,650.00 Sealant
- Rp 6,000.00
- Rp 393.00
- Rp 200,000.00
No Uraian Pekerjaan
- Rp 265,823.00
1 2
- Rp 1,434.00 F.10 Pemasangan 1 Unit Engsel Pintu
- Rp 16,395.00 Pekerja
- Rp 1,800.00 Tukang Kayu
- Rp 1,048.00 Kepala Tukang Kayu
- Rp 25,000.00 Mandor
- Rp 45,677.00 Engsel Pintu (Stainless Eks.Otis 4"x3")
- Rp 114,720.00
- Rp 131,160.00
No Uraian Pekerjaan
- Rp 14,400.00
- Rp 786.00 1 2
- Rp 1,760,000.00 F.11 Pemasangan 1 Buah Engsel Jendela
- Rp 2,021,066.00 Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Engsel Jendela (Stainless Eks.Otis 3" x 2,5")
No Uraian Pekerjaan
1 2
F.12 Pemasangan 1 Buah Kunci Tanam
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kunci Tanam (Eks. Ses Art 2030 40mm SS)
No Uraian Pekerjaan
1 2
F.13 Pemasangan 1 Buah Kunci Tanam Kamar Mandi
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kunci Tanam
No Uraian Pekerjaan
1 2
F.15 Pemasangan 1 Buah Kait Angin
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kait Angin
No Uraian Pekerjaan
1 2
F.16 Pemasangan 1 m2 Garasi Besi (Rolling Door)
Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Pintu Besi Henderson
No Uraian Pekerjaan
1 2
F.14 Pemasangan 1 Buah Pegangan Pintu
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Pegangan Pintu (BLC AAH 8 SS)
NO URUTAN PEKERJAAN
1 2
KEBUTUHAN BAHAN DAN TENAGA KERJA PE
Rp 95,600.00 - - 2.358 - -
Rp 109,300.00 - - 7.074 - -
Rp 120,000.00 - - 0.7074 - -
Rp 131,000.00 - - 0.1179 - -
- Rp 8,500,000.00 - - 0.4716 -
- Rp 15,000.00 - - 0.49125 -
- Rp 15,000.00 - - 0.393 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 7.221334 - -
Rp 109,300.00 - - 7.221334 - -
Rp 120,000.00 - - 0.7221334 - -
Rp 131,000.00 - - 0.3526698 - -
- Rp 117,500.00 - - 184.7318 -
- Rp 283.33 - - 335.876 -
- Rp 25,000.00 - - 10.07628 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 16.6423608 - -
Rp 109,300.00 - - 49.9270824 - -
Rp 120,000.00 - - 4.99270824 - -
Rp 131,000.00 - - 0.841907664 - -
- Rp 9,000,000.00 - - 0.4894812 -
- Rp 15,000.00 - 15.6633984 -
- Rp 25,000.00 - - 0.58737744 -
- Rp 120,000.00 - - 19.579248 -
- Rp 26,400.00 - - 9.789624 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 0.44 - -
Rp 109,300.00 - - 0.44 - -
Rp 120,000.00 - - 0.044 - -
Rp 131,000.00 - - 0.022 - -
- Rp 1,100,000.00 - - 1 -
- Rp 55,000.00 - - 1 -
- Rp 225,000.00 - - 1 -
- Rp 200,000.00 - - 1 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 0.44 - -
Rp 109,300.00 - - 0.44 - -
Rp 120,000.00 - - 0.044 - -
Rp 131,000.00 - - 0.022 - -
- Rp 1,800,000.00 - - 2 -
- Rp 55,000.00 - - 2 -
- Rp 225,000.00 - - 1 -
- Rp 200,000.00 - - 2 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 8.36 - -
Rp 109,300.00 - - 8.36 - -
Rp 120,000.00 - - 0.836 - -
Rp 131,000.00 - - 0.418 - -
- Rp 600,000.00 - - 19 -
- Rp 45,000.00 - - 38 -
- Rp 25,000.00 - - 19 -
- Rp 25,000.00 - - 1.14 -
- Rp 50,000.00 - - 19 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 1.118 - -
Rp 109,300.00 - - 1.118 - -
Rp 120,000.00 - - 0.1118 - -
Rp 131,000.00 - - 0.05504 - -
- Rp 642,000.00 - - 2.58 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 0.03 - -
Rp 109,300.00 - - 0.3 - -
Rp 120,000.00 - - 0.03 - -
Rp 131,000.00 - - 0.0016 - -
- Rp 20,000.00 - - 2 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 0.383445165 - -
Rp 109,300.00 - - 3.83445165 - -
Rp 120,000.00 - - 0.383445165 - -
Rp 131,000.00 - - 0.0204504088 - -
- Rp 116,600.00 - - 28.1193121 -
- Rp 25,000.00 - - 1.27815055 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 0.72 - -
Rp 109,300.00 - - 7.2 - -
Rp 120,000.00 - - 0.72 - -
Rp 131,000.00 - - 0.0384 - -
- Rp 41,500.00 - - 48 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 0.54 - -
Rp 109,300.00 - - 5.4 - -
Rp 120,000.00 - - 0.54 - -
Rp 131,000.00 - - 0.0288 - -
- Rp 35,000.00 - - 36 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 0.29 -
Rp 109,300.00 - - 14.5 -
Rp 120,000.00 - - 1.45 -
Rp 131,000.00 - - 0.145 -
- Rp 210,000.00 - - 29
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 0.02 - -
Rp 109,300.00 - - 2 - -
Rp 120,000.00 - - 0.02 - -
Rp 131,000.00 - - 0.01 - -
- Rp 33,000.00 - - 4 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 0.27 - -
Rp 109,300.00 - - 2.7 - -
Rp 120,000.00 - - 0.27 - -
Rp 131,000.00 - - 0.144 - -
- Rp 25,000.00 - - 18 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 14.4432 - -
Rp 109,300.00 - - 14.4432 - -
Rp 120,000.00 - - 1.44432 - -
Rp 131,000.00 - - 0.072216 - -
- Rp 1,600,000.00 - - 13.2396 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 0.7 - -
Rp 109,300.00 - - 7 - -
Rp 120,000.00 - - 0.7 - -
Rp 131,000.00 - - 0.042 - -
- Rp 200,000.00 - - 14 -
Jumlah
Total
Rp 690,359.53 - -
Rp 789,291.81 - -
Rp 86,656.01 - -
Rp 46,199.74 - -
- Rp 21,705,986.50 -
- Rp 95,163.75 -
- Rp 251,907.00 -
Rp 1,612,507.09 Rp 22,053,057.25 -
Rp 23,665,564.34
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 1,591,009.69 - -
Rp 5,457,030.11 - -
Rp 599,124.99 - -
Rp 110,289.90 - -
- Rp 4,405,330.80 -
- Rp 234,950.98 -
- Rp 14,684.44 -
- Rp 2,349,509.76 -
- Rp 258,446.07 -
Rp 7,757,454.69 Rp 7,262,922.05 -
Rp 15,020,376.74
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 42,064.00 - -
Rp 48,092.00 - -
Rp 5,280.00 - -
Rp 2,882.00 - -
- Rp 1,100,000.00 -
- Rp 55,000.00 -
- Rp 225,000.00 -
- Rp 200,000.00 -
Rp 98,318.00 Rp 1,580,000.00 -
Rp 1,678,318.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 42,064.00 - -
Rp 48,092.00 - -
Rp 5,280.00 - -
Rp 2,882.00 - -
- Rp 3,600,000.00 -
- Rp 110,000.00 -
- Rp 225,000.00 -
- Rp 400,000.00 -
Rp 98,318.00 Rp 4,335,000.00 -
Rp 4,433,318.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 799,216.00 - -
Rp 913,748.00 - -
Rp 100,320.00 - -
Rp 54,758.00 - -
- Rp 11,400,000.00 -
- Rp 1,710,000.00 -
- Rp 475,000.00 -
- Rp 28,500.00 -
- Rp 950,000.00 -
Rp 1,868,042.00 Rp 14,563,500.00 -
Rp 16,431,542.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 106,880.80 - -
Rp 122,197.40 - -
Rp 13,416.00 - -
Rp 7,210.24 - -
- Rp 1,656,360.00 -
Rp 249,704.44 Rp 1,656,360.00 -
Rp 1,906,064.44
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 2,868.00 - -
Rp 32,790.00 - -
Rp 3,600.00 - -
Rp 209.60 - -
- Rp 40,000.00 -
Rp 39,467.60 Rp 40,000.00 -
Rp 79,467.60
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 36,657.36 - -
Rp 419,105.57 - -
Rp 46,013.42 - -
Rp 2,679.00 - -
- Rp 3,278,711.79 -
- Rp 31,953.76 -
Rp 504,455.35 Rp 3,310,665.55 -
Rp 3,815,120.90
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 68,832.00 - -
Rp 786,960.00 - -
Rp 86,400.00 - -
Rp 5,030.40 - -
- Rp 1,992,000.00 -
Rp 947,222.40 Rp 1,992,000.00 -
Rp 2,939,222.40
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 51,624.00 - -
Rp 590,220.00 - -
Rp 64,800.00 - -
Rp 3,772.80 - -
- Rp 1,260,000.00 -
Rp 710,416.80 Rp 1,260,000.00 -
Rp 1,970,416.80
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 27,724.00 - -
Rp 1,584,850.00 - -
Rp 174,000.00 - -
Rp 18,995.00 - -
- Rp 6,090,000.00 -
Rp 1,805,569.00 Rp 6,090,000.00 -
Rp 7,895,569.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 1,912.00 - -
Rp 218,600.00 - -
Rp 2,400.00 - -
Rp 1,310.00 - -
- Rp 132,000.00 -
Rp 224,222.00 Rp 132,000.00 -
Rp 356,222.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 25,812.00 - -
Rp 295,110.00 - -
Rp 32,400.00 - -
Rp 18,864.00 - -
- Rp 450,000.00 -
Rp 372,186.00 Rp 450,000.00 -
Rp 822,186.00
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 1,380,769.92 - -
Rp 1,578,641.76 - -
Rp 173,318.40 - -
Rp 9,460.30 - -
- Rp 21,183,360.00 -
Rp 3,142,190.38 Rp 21,183,360.00 -
Rp 24,325,550.38
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 66,920.00 - -
Rp 765,100.00 - -
Rp 84,000.00 - -
Rp 5,502.00 - -
- Rp 2,800,000.00 -
Rp 921,522.00 Rp 2,800,000.00 -
Rp 3,721,522.00
Type Kusen Pintu/Jendela Panjang (m) Jumlah Luas Penampang Kusen (5/15)
Ambang Pintu 0.9 2 0.0075
Tiang Pintu 2.45 2 0.0075
Ambang Pintu 0.8 1 0.0075
Tiang Pintu 2.15 2 0.0075
Ambang Pintu 0.8 1 0.0075
Tiang Pintu 2.15 2 0.0075
Ambang Pintu 0.9 1 0.0075
Tiang Pintu 2.15 2 0.0075
TOTAL VOLUME KUSEN KAYU (m3)
PER
Volume (m3) Jumlah Type (Buah) Total Volume (m3) Type Kusen Pintu/Jendela
0.0135
4 0.201 PJ 3
0.0368
0.0060
3 0.115 P3
0.0323
0.0060
1 0.038 J1
0.0323
0.0068
1 0.039 J2
0.0323
0.393 J3
J4
J5
BV
J7
PJ 2
PJ 4
Type Kusen Pintu/Jendela Panjang (m) Jumlah Type (Buah) Volume (m')
Ambang Pintu 3.15
1 9.632
Tiang Pintu 6.482
Ambang Pintu 1.8
1 6.8
Tiang Pintu 5
Ambang Pintu 4.05
7 54.25
Tiang Pintu 3.7
Ambang Pintu 2.4
1 10
Tiang Pintu 7.6
Ambang Pintu 3.9
1 18.72
Tiang Pintu 4.8
Ambang Pintu 2.1
1 5.5
Tiang Pintu 3.4
Ambang Pintu 10.5
1 15.6
Tiang Pintu 5.1
Ambang Pintu 0.6
1 1.2
Tiang Pintu 0.6
Ambang Pintu 0.9
4 13.736
Tiang Pintu 2.534
Ambang Pintu 6.5
1 15.7
Tiang Pintu 9.2
Ambang Pintu 9
1 16.8
Tiang Pintu 7.8
TOTAL VOLUME KUSEN ALUMUNIUM (m') 167.938
No
1
2
3
4
5
6
7
8
9
Total Vo
No
1
2
3
4
5
6
7
8
9
10
11
Total Volu
No
1
2
3
4
5
6
7
8
9
Total
TU DAN JENDELA
No Jumlah (bh) No
PJ 2 1 PJ 2
PJ 3 1 PJ 3
PJ4 1 PJ4
J1 7 J1
J2 1 J2
J3 1 J3
J4 1 J4
J5 1 J5
BV 1 J7
J7 4 Total
Total 19
Type Pintu Jumlah Engsel Jumlah Type Kusen Total Volume (buah)
P1 3 4 12
P2 3 3 9
P2* 3 1 3
P3 3 1 3
P4 3 1 3
PJ2 6 1 6
PJ3 3 1 3
PJ4 6 1 6
PB 3 1 3
Total Volume Engsel Pintu (Buah) 48
Type Kusen Jumlah Kunci Tanam Jumlah Type Kusen Total Volume (buah)
P1 1 4 4
P3 1 1 1
P4 1 1 1
PJ2 1 1 1
PJ3 2 1 2
PJ4 1 1 1
PB 1 1 1
J1 2 7 14
J3 2 1 2
J4 1 1 1
J5 1 1 1
Total Volume Kunci Tanam (Buah) 29
Volume (m2)
1.72
No
1
1
2
3
4
Total Volume (buah) 5
28 6
- 7
4 8
2 9
2 10
- 11
12
36
13
14
15
16
17
Total Volume (buah) 18
3 19
1 20
21
4
22
23
24
25
Volume (m2) 26
12.036 27
28
29
30
URUTAN PEKERJAAN
2
Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Jendela Kayu Kelas II
Pembuatan dan Pemasangan 1 m Kusen Alumunium
Pembuatan dan Pemasangan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Kelas II
Pemasangan 1 Unit Daun Pintu Alumunium P3
Pemasangan 1 Unit Daun Pintu PJ2
Pemasangan 1 Unit Daun Jendela Alumunium
Pemasangan 1 m2 Pintu Besi
Pemangan 1 Buah Glass Block
Pemangan 1 m2 Kaca Polos Tebal 5 mm
Pemasangan 1 Unit Engsel Pintu
Pemasangan 1 Buah Engsel Jendela
Pemasangan 1 Buah Kunci Tanam
Pemasangan 1 Buah Kunci Tanam Kamar Mandi
Pemasangan 1 Buah Pegangan Pintu
Pemasangan 1 Buah Kait Angin
Pemasangan 1 m2 Garasi Besi (Rolling Door)
Total Anggaran Biaya
Tenaga Kerja
2
Pekerja
Tukang Kayu
Tukang Khusus Alumunium
Tukang Besi
Kepala Tukang Kayu
Kepala Tukang Khusus Alumunium
Kepala Tukang Besi
Mandor
Total
Bahan
2
Balok Kayu Kamper Samarinda
Paku 10 cm
Lem Kayu
Profil Alumunium
Skrup Fixer
Sealant
Kayu Papan Samarinda
Paku 1" - 2,5"
Teakwood, t = 4mm , 90 x 220 mm
Plat Seng Alumumium
Daun Pintu Alumunium PJ2
Daun Pintu Alumunium P3
Engsel Pintu + Baut
Kunci Pintu
Handle Tarik (BLC AAH8 SS)
Handle Tarik
Daun Jendela Alumunium
Engsel Jendela
Slot Jendela
Accessories
Pintu Besi + Accessories
Glass Block
Kaca Polos Tebal 5mm Asahi
Engsel Pintu (Stainless Eks.Otis 4"x3")
Engsel Jendela (Stainless Eks.Otis 3" x 2,5")
Kunci Tanam (Eks. Ses Art 2030 40mm SS)
Kunci Tanam
Pegangan Pintu (BLC AAH 8 SS)
Kait Angin
Pintu Besi Henderson
Total
HARGA SATUAN
VOL SAT
UPAH BAHAN
3 4 5 6
0.393 m3 Rp 2,796,300.00 Rp 10,233,750.00
167.938 m Rp 9,601.80 Rp 131,316.66
19.579 m2 Rp 396,208.00 Rp 370,950.00
1.000 Buah Rp 98,318.00 Rp 1,580,000.00
1.000 Buah Rp 98,318.00 Rp 4,335,000.00
19.000 Buah Rp 98,318.00 Rp 766,500.00
1.720 m2 Rp 145,177.00 Rp 963,000.00
2.000 Buah Rp 19,733.80 Rp 20,000.00
25.563 m2 Rp 19,733.80 Rp 129,510.00
48.000 Buah Rp 19,733.80 Rp 41,500.00
36.000 Buah Rp 19,733.80 Rp 35,000.00
29.000 Buah Rp 62,261.00 Rp 210,000.00
4.000 Buah Rp 56,055.50 Rp 33,000.00
14.000 Buah Rp 65,823.00 Rp 200,000.00
18.000 Buah Rp 20,677.00 Rp 25,000.00
12.036 m2 Rp 261,066.00 Rp 1,760,000.00
n Biaya
Biaya Upah
6 = (4 x 5)
Rp 5,160,138.10
Rp 10,922,953.87
Rp 1,799,223.81
Rp 1,700,839.16
Rp 1,177,626.41
Rp 197,536.01
Rp 186,734.40
Rp 305,489.89
Rp 21,450,541.64
Biaya Bahan
6 = (4 x 5)
Rp 4,008,600.00
Rp 7,368.75
Rp 240,845.98
Rp 21,705,986.50
Rp 95,163.75
Rp 312,360.76
Rp 4,405,330.80
Rp 14,684.44
Rp 2,349,509.76
Rp 258,446.07
Rp 3,600,000.00
Rp 1,100,000.00
Rp 165,000.00
Rp 450,000.00
Rp 200,000.00
Rp 400,000.00
Rp 11,400,000.00
Rp 1,710,000.00
Rp 475,000.00
Rp 950,000.00
Rp 1,656,360.00
Rp 40,000.00
Rp 3,278,711.79
Rp 1,992,000.00
Rp 1,260,000.00
Rp 6,090,000.00
Rp 132,000.00
Rp 2,800,000.00
Rp 450,000.00
Rp 21,183,360.00
Rp 92,730,728.60
ANALISA HARGA SATUAN
Pekerja 0.15 Oh
Mandor 0.01 Oh
Pasir Urug 1.2 m3
JUMLAH
G.2 1 m3 Membuat Beton Tumbuk 1 PC : 3 PS : 5 KRL
Pekerja 1.65 Oh
Tukang Batu 0.25 Oh
Kepala Tukang Batu 0.025 Oh
Mandor 0.08 Oh
Semen Portland 218 Kg
Pasir Beton 0.52 m3
Koral Beton 0.87 m3
JUMLAH
G.3 1 m3 Urugan Tanah Peninggian Lantai
Pekerja 0.25 Oh
Mandor 0.025 Oh
Tanah Urug 1.2 m3
JUMLAH
G.4 Pemasangan 1 m2 Lantai Gracewood (Costul Dev Uk. 12 x 102 x 900 mm)
Pekerja 0.7 Oh
Tukang Kayu 0.35 Oh
Kepala Tukang Kayu 0.035 Oh
Mandor 0.035 Oh
Grace Wood (Costul Dev Uk. 12 x 102 x 900 mm) 1.05 m2
Lem Kayu 0.6 Kg
JUMLAH
G.5 Pemasangan 1 m2 Keramik 50 x 50 Roman Polos
Pekerja 0.7 Oh
Tukang Batu 0.35 Oh
Kepala Tukang Batu 0.035 Oh
Mandor 0.035 Oh
Keramik Uk. 50x50 Roman Polos (Golongan A) 1.05 Dus (Isi 4)
Semen Portland 7.5 Kg
Semen Warna 0.5 Kg
Pasir Pasang 0.045 m3
JUMLAH
G.6 Pemasangan 1 m2 Lantai Keramik 33,3 x 33,3 Roman Polos
Pekerja 0.7 Oh
Tukang Batu 0.35 Oh
Kepala Tukang Batu 0.035 Oh
Mandor 0.035 Oh
Keramik Uk. 33,3 x 33,3 Roman Polos (Golongan A) 1.05 Dus (Isi 9)
Semen Portland 8.19 Kg
Semen Warna 0.5 Kg
Pasir Pasang 0.045 m3
JUMLAH
G.7 Pemasangan 1 m2 Lantai Keramik 30 x 30 Roman Polos
Pekerja 0.7 Oh
Tukang Batu 0.35 Oh
Kepala Tukang Batu 0.035 Oh
Mandor 0.035 Oh
Keramik Uk. 30 x 30 Roman Polos (Golongan B) 1.05 Dus (isi 11)
Semen Portland 10 Kg
Semen Warna 0.5 Kg
Pasir Pasang 0.045 m3
JUMLAH
G.8 Pemasangan 1 m2 Lantai Keramik 20 x 20 Roman Polos
Pekerja 0.7 Oh
Tukang Batu 0.35 Oh
Kepala Tukang Batu 0.035 Oh
Mandor 0.035 Oh
Keramik Uk. 20 x 20 Roman Polos (Golongan A) 1.05 Dus (isi 25)
Semen Portland 10.4 Kg
Semen Warna 0.5 Kg
Pasir Pasang 0.045 m3
JUMLAH
G.9 Pemasangan 1 m2 Lantai Keramik Uk. 10 cm x 33 cm Roman Polos Untuk Border
Pekerja 1.05 Oh
Tukang Batu 0.525 Oh
Kepala Tukang Batu 0.053 Oh
Mandor 0.053 Oh
Keramik Uk. 10 x 33 Roman Polos 33 Bh
Semen Portland 9.8 Kg
Semen Warna 4.37 Kg
Pasir Pasang 0.045 m3
JUMLAH
G.10 Pemasangan 1 m' Plint Kayu Tebal 2 cm Lebar 10 cm
Pekerja 0.12 Oh
Tukang Kayu 0.12 Oh
Kepala Tukang Kayu 0.012 Oh
Mandor 0.006 Oh
Kayu Papan Borneo Super 0.003 m3
Paku 5 cm - 7 cm 0.05 Kg
JUMLAH
G.11 Pemasangan 1 m2 Paving Block Berwarna Tebal 6 cm (Ubin Set 21x21x6)
Pekerja 0.25 Oh
Tukang Batu 0.5 Oh
Kepala Tukang Batu 0.05 Oh
Mandor 0.0013 Oh
Paving Block Berwarna Tebal 6 cm (21x21x6) 1.01 m2
Pasir Beton 0.05 m3
JUMLAH
G.12 Pemasangan 1 m2 Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6)
Pekerja 0.25 Oh
Tukang Batu 0.5 Oh
Kepala Tukang Batu 0.05 Oh
Mandor 0.0013 Oh
Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6) 1.01 m2
Pasir Beton 0.05 m3
JUMLAH
HARGA SATUAN PEKERJAAN LANTAI
Rp 95,600.00 - - Rp 14,340.00 - -
Rp 131,000.00 - - Rp 1,310.00 - -
- Rp 224,500.00 - - Rp 269,400.00 -
Rp 15,650.00 Rp 269,400.00 -
Rp 95,600.00 - - Rp 157,740.00 - -
Rp 109,300.00 - - Rp 27,325.00 - -
Rp 120,000.00 - - Rp 3,000.00 - -
Rp 131,000.00 - - Rp 10,480.00 - -
- Rp 1,100.00 - - Rp 239,800.00 -
- Rp 250,000.00 - - Rp 130,000.00 -
- Rp 148,100.00 - - Rp 128,847.00 -
Rp 198,545.00 Rp 498,647.00 -
Rp 95,600.00 - - Rp 23,900.00 -
Rp 131,000.00 - - Rp 3,275.00 -
- Rp 50,000.00 - - Rp 60,000.00
Rp 27,175.00 Rp 60,000.00 -
Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 325,000.00 - - Rp 341,250.00 -
- Rp 15,000.00 - - Rp 9,000.00 -
Rp 113,960.00 Rp 350,250.00 -
Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 123,500.00 - - Rp 129,675.00 -
- Rp 1,100.00 - - Rp 8,250.00 -
- Rp 15,000.00 - - Rp 7,500.00 -
- Rp 224,500.00 - - Rp 10,102.50 -
Rp 113,960.00 Rp 155,527.50 -
Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 97,000.00 - - Rp 101,850.00 -
- Rp 1,100.00 - - Rp 9,009.00 -
- Rp 15,000.00 - - Rp 7,500.00 -
- Rp 224,500.00 - - Rp 10,102.50 -
Rp 113,960.00 Rp 128,461.50 -
Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 87,000.00 - - Rp 91,350.00 -
- Rp 1,100.00 - - Rp 11,000.00 -
- Rp 15,000.00 - - Rp 7,500.00 -
- Rp 224,500.00 - - Rp 10,102.50 -
Rp 113,960.00 Rp 119,952.50 -
Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 87,000.00 - - Rp 91,350.00 -
- Rp 1,100.00 - - Rp 11,440.00 -
- Rp 15,000.00 - - Rp 7,500.00 -
- Rp 224,500.00 - - Rp 10,102.50 -
Rp 113,960.00 Rp 120,392.50 -
order
Rp 95,600.00 - - Rp 100,380.00 - -
Rp 109,300.00 - - Rp 57,382.50 - -
Rp 120,000.00 - - Rp 6,360.00 - -
Rp 131,000.00 - - Rp 6,943.00 - -
- Rp 11,000.00 - - Rp 363,000.00 -
- Rp 1,100.00 - - Rp 10,780.00 -
- Rp 15,000.00 - - Rp 65,550.00 -
- Rp 224,500.00 - - Rp 10,102.50 -
Rp 171,065.50 Rp 449,432.50 -
Rp 95,600.00 - - Rp 11,472.00 - -
Rp 109,300.00 - - Rp 13,116.00 - -
Rp 120,000.00 - - Rp 1,440.00 - -
Rp 131,000.00 - - Rp 786.00 - -
- Rp 5,500,000.00 - - Rp 16,500.00 -
- Rp 16,000.00 - - Rp 800.00 -
Rp 26,814.00 Rp 17,300.00 -
Rp 95,600.00 - - Rp 23,900.00 - -
Rp 109,300.00 - - Rp 54,650.00 - -
Rp 120,000.00 - - Rp 6,000.00 - -
Rp 131,000.00 - - Rp 170.30 - -
- Rp 110,000.00 - - Rp 111,100.00 -
- Rp 250,000.00 - - Rp 12,500.00 -
Rp 84,720.30 Rp 123,600.00 -
Rp 95,600.00 - - Rp 23,900.00 - -
Rp 109,300.00 - - Rp 54,650.00 - -
Rp 120,000.00 - - Rp 6,000.00 - -
Rp 131,000.00 - - Rp 170.30 - -
- Rp 80,000.00 - - Rp 80,800.00 -
- Rp 250,000.00 - - Rp 12,500.00 -
Rp 84,720.30 Rp 93,300.00 -
Jumlah (Rp) No Uraian Pekerjaan
11 = ( 8+9+10) 1 2
G
G.1 1 m3 Urugan Pasir Tebal 5 cm
Pekerja
Rp 14,340.00 Mandor
Rp 1,310.00 Pasir Urug
Rp 269,400.00
Rp 285,050.00
No Uraian Pekerjaan
Rp 157,740.00 1 2
Rp 27,325.00 G.2 1 m3 Membuat Beton Tumbuk 1 PC : 3 PS : 5 KRL
Rp 3,000.00 Pekerja
Rp 10,480.00 Tukang Batu
Rp 239,800.00 Kepala Tukang Batu
Rp 130,000.00 Mandor
Rp 128,847.00 Semen Portland
Rp 697,192.00 Pasir Beton
Koral Beton
Rp 23,900.00
Rp 3,275.00
No Uraian Pekerjaan
Rp 60,000.00
Rp 87,175.00 1 2
G.3 1 m3 Urugan Tanah Peninggian Lantai
Pekerja
Rp 66,920.00 Mandor
Rp 38,255.00 Tanah Urug
Rp 4,200.00
Rp 4,585.00
Rp 341,250.00
No Uraian Pekerjaan
Rp 9,000.00
Rp 464,210.00 1 2
G.4 Pemasangan 1 m2 Lantai Gracewood (Costul Dev Uk. 12 x 102 x 900 mm)
Pekerja
Rp 66,920.00 Tukang Kayu
Rp 38,255.00 Kepala Tukang Kayu
Rp 4,200.00 Mandor
Rp 4,585.00 Grace Wood (Costul Dev Uk. 12 x 102 x 900 mm)
Rp 129,675.00 Lem Kayu
Rp 8,250.00
Rp 7,500.00
Rp 10,102.50
No Uraian Pekerjaan
Rp 269,487.50
1 2
G.5 Pemasangan 1 m2 Keramik 50 x 50 Roman Polos
Rp 66,920.00 Pekerja
Rp 38,255.00 Tukang Batu
Rp 4,200.00 Kepala Tukang Batu
Rp 4,585.00 Mandor
Rp 101,850.00 Keramik Uk. 50x50 Roman Polos (Golongan A)
Rp 9,009.00 Semen Portland
Rp 7,500.00 Semen Warna
Rp 10,102.50 Pasir Pasang
Rp 242,421.50
No Uraian Pekerjaan
Rp 66,920.00
Rp 38,255.00 1 2
Rp 4,200.00 G.6 Pemasangan 1 m2 Lantai Keramik 33,3 x 33,3 Roman Polos
Rp 4,585.00 Pekerja
Rp 91,350.00 Tukang Batu
Rp 11,000.00 Kepala Tukang Batu
Rp 7,500.00 Mandor
Rp 10,102.50 Keramik Uk. 33,3 x 33,3 Roman Polos (Golongan A)
Rp 233,912.50 Semen Portland
Semen Warna
Pasir Pasang
Rp 66,920.00
Rp 38,255.00
Rp 4,200.00
No Uraian Pekerjaan
Rp 4,585.00
Rp 91,350.00 1 2
Rp 11,440.00 G.7 Pemasangan 1 m2 Lantai Keramik 30 x 30 Roman Polos
Rp 7,500.00 Pekerja
Rp 10,102.50 Tukang Batu
Rp 234,352.50 Kepala Tukang Batu
Mandor
Keramik Uk. 30 x 30 Roman Polos (Golongan B)
Rp 100,380.00 Semen Portland
Rp 57,382.50 Semen Warna
Rp 6,360.00 Pasir Pasang
Rp 6,943.00
Rp 363,000.00
Rp 10,780.00
No Uraian Pekerjaan
Rp 65,550.00
Rp 10,102.50 1 2
Rp 620,498.00 G.8 Pemasangan 1 m2 Lantai Keramik 20 x 20 Roman Polos
Pekerja
Tukang Batu
Rp 11,472.00 Kepala Tukang Batu
Rp 13,116.00 Mandor
Rp 1,440.00 Keramik Uk. 20 x 20 Roman Polos (Golongan A)
Rp 786.00 Semen Portland
Rp 16,500.00 Semen Warna
Rp 800.00 Pasir Pasang
Rp 44,114.00
No Uraian Pekerjaan
Rp 23,900.00
Rp 54,650.00 1 2
Rp 6,000.00 G.9 Pemasangan 1 m2 Lantai Keramik Uk. 10 cm x 33 cm Roman Polos Untuk Bo
Rp 170.30 Pekerja
Rp 111,100.00 Tukang Batu
Rp 12,500.00 Kepala Tukang Batu
Rp 208,320.30 Mandor
Keramik Uk. 10 x 33 Roman Polos
Semen Portland
Rp 23,900.00 Semen Warna
Rp 54,650.00 Pasir Pasang
Rp 6,000.00
Rp 170.30
Rp 80,800.00
No Uraian Pekerjaan
Rp 12,500.00
Rp 178,020.30 1 2
G.10 Pemasangan 1 m' Plint Kayu Tebal 2 cm Lebar 10 cm
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Papan Borneo Super
Paku 5 cm - 7 cm
No Uraian Pekerjaan
1 2
G.11 Pemasangan 1 m2 Paving Block Berwarna Tebal 6 cm (Ubin Set 21x21x6)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Paving Block Berwarna Tebal 6 cm (21x21x6)
Pasir Beton
No Uraian Pekerjaan
1 2
G.12 Pemasangan 1 m2 Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6)
Pasir Beton
KEBUTUHAN BAHAN DAN TENAG
2 3 4 5
inggian Lantai 30.48 - m3
0.25 Oh
0.025 Oh
1.2 m3
Rp 95,600.00 - - 0.190512 - -
Rp 131,000.00 - - 0.0127008 - -
- Rp 224,500.00 - - 1.524096 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 2.7243216 - -
Rp 109,300.00 - - 0.412776 - -
Rp 120,000.00 - - 0.0412776 - -
Rp 131,000.00 - - 0.13208832 - -
- Rp 1,100.00 - - 359.940672 -
- Rp 250,000.00 - - 0.85857408 -
- Rp 148,100.00 - - 1.43646048 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 7.61965875 - -
Rp 131,000.00 - - 0.761965875 - -
- Rp 50,000.00 - - 36.574362 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 68.404 - -
Rp 109,300.00 - - 34.202 - -
Rp 120,000.00 - - 3.4202 - -
Rp 131,000.00 - - 3.4202 - -
- Rp 325,000.00 - - 102.606 -
- Rp 15,000.00 - - 58.632 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 86.77921 - -
Rp 109,300.00 - - 43.389605 - -
Rp 120,000.00 - - 4.3389605 - -
Rp 131,000.00 - - 4.3389605 - -
- Rp 123,500.00 - - 130.168815 -
- Rp 1,100.00 - - 929.77725 -
- Rp 15,000.00 - - 61.98515 -
- Rp 224,500.00 - - 5.5786635 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 25.34567 - -
Rp 109,300.00 - - 12.672835 - -
Rp 120,000.00 - - 1.2672835 - -
Rp 131,000.00 - - 1.2672835 - -
- Rp 97,000.00 - - 38.018505 -
- Rp 1,100.00 - - 296.544339 -
- Rp 15,000.00 - - 18.10405 -
- Rp 224,500.00 - - 1.6293645 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 21.24864 - -
Rp 109,300.00 - - 10.62432 - -
Rp 120,000.00 - - 1.062432 - -
Rp 131,000.00 - - 1.062432 - -
- Rp 87,000.00 - - 31.87296 -
- Rp 1,100.00 - - 303.552 -
- Rp 15,000.00 - - 15.1776 -
- Rp 224,500.00 - 1.365984 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 23.8707 - -
Rp 109,300.00 - - 11.93535 - -
Rp 120,000.00 - - 1.193535 - -
Rp 131,000.00 - - 1.193535 - -
- Rp 87,000.00 - - 35.80605 -
- Rp 1,100.00 - - 354.6504 -
- Rp 15,000.00 - - 17.0505 -
- Rp 224,500.00 - - 1.534545 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 4.20441 - -
Rp 109,300.00 - - 2.102205 - -
Rp 120,000.00 - - 0.2122226 - -
Rp 131,000.00 - - 0.2122226 - -
- Rp 11,000.00 - - 132.1386 -
- Rp 1,100.00 - - 39.24116 -
- Rp 15,000.00 - - 17.498354 -
- Rp 224,500.00 - - 0.180189 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 14.382 - -
Rp 109,300.00 - - 14.382 - -
Rp 120,000.00 - - 1.4382 - -
Rp 131,000.00 - - 0.7191 - -
- Rp 5,500,000.00 - - 0.35955 -
- Rp 16,000.00 - - 5.9925 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 5.3361 - -
Rp 109,300.00 - - 10.6722 - -
Rp 120,000.00 - - 1.06722 - -
Rp 131,000.00 - - 0.02774772 - -
- Rp 110,000.00 - - 21.557844 -
- Rp 250,000.00 - - 1.06722 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 1.0143 - -
Rp 109,300.00 - - 2.0286 - -
Rp 120,000.00 - - 0.20286 - -
Rp 131,000.00 - - 0.00527436 - -
- Rp 80,000.00 - - 4.097772 -
- Rp 250,000.00 - - 0.20286 -
Jumlah
Total
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 18,212.95 - -
Rp 1,663.80 - -
- Rp 342,159.55 -
Rp 19,876.75 Rp 342,159.55 -
Rp 362,036.30
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 260,445.14 - -
Rp 45,116.42 - -
Rp 4,953.31 - -
Rp 17,303.57 - -
- Rp 395,934.74 -
- Rp 214,643.52 -
- Rp 212,739.80 -
Rp 327,818.44 Rp 823,318.06 -
Rp 1,151,136.50
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 728,439.38 - -
Rp 99,817.53 - -
- Rp 1,828,718.10 -
Rp 828,256.91 Rp 1,828,718.10 -
Rp 2,656,975.01
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 6,539,422.40 - -
Rp 3,738,278.60 - -
Rp 410,424.00 - -
Rp 448,046.20 - -
- Rp 33,346,950.00 -
- Rp 879,480.00 -
Rp 11,136,171.20 Rp 34,226,430.00 -
Rp 45,362,601.20
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 8,296,092.48 - -
Rp 4,742,483.83 - -
Rp 520,675.26 - -
Rp 568,403.83 - -
- Rp 16,075,848.65 -
- Rp 1,022,754.98 -
- Rp 929,777.25 -
- Rp 1,252,409.96 -
Rp 14,127,655.39 Rp 19,280,790.83 -
Rp 33,408,446.22
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 2,423,046.05 - -
Rp 1,385,140.87 - -
Rp 152,074.02 - -
Rp 166,014.14 - -
- Rp 3,687,794.99 -
- Rp 326,198.77 -
- Rp 271,560.75 -
- Rp 365,792.33 -
Rp 4,126,275.08 Rp 4,651,346.84 -
Rp 8,777,621.91
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 2,031,369.98 - -
Rp 1,161,238.18 - -
Rp 127,491.84 - -
Rp 139,178.59 - -
- Rp 2,772,947.52 -
- Rp 333,907.20 -
- Rp 227,664.00 -
- Rp 306,663.41 -
Rp 3,459,278.59 Rp 3,641,182.13 -
Rp 7,100,460.72
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 2,282,038.92 - -
Rp 1,304,533.76 - -
Rp 143,224.20 - -
Rp 156,353.09 - -
- Rp 3,115,126.35 -
- Rp 390,115.44 -
- Rp 255,757.50 -
- Rp 344,505.35 -
Rp 3,886,149.96 Rp 4,105,504.64 -
Rp 7,991,654.60
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 401,941.60 - -
Rp 229,771.01 - -
Rp 25,466.71 - -
Rp 27,801.16 - -
- Rp 1,453,524.60 -
- Rp 43,165.28 -
- Rp 262,475.31 -
- Rp 40,452.43 -
Rp 684,980.48 Rp 1,799,617.62 -
Rp 2,484,598.09
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 1,374,919.20 - -
Rp 1,571,952.60 - -
Rp 172,584.00 - -
Rp 94,202.10 - -
- Rp 1,977,525.00 -
- Rp 95,880.00 -
Rp 3,213,657.90 Rp 2,073,405.00 -
Rp 5,287,062.90
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 510,131.16 - -
Rp 1,166,471.46 - -
Rp 128,066.40 - -
Rp 3,634.95 - -
- Rp 2,371,362.84 -
- Rp 266,805.00 -
Rp 1,808,303.97 Rp 2,638,167.84 -
Rp 4,446,471.81
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 96,967.08 - -
Rp 221,725.98 - -
Rp 24,343.20 - -
Rp 690.94 - -
- Rp 327,821.76 -
- Rp 50,715.00 -
Rp 343,727.20 Rp 378,536.76 -
Rp 722,263.96
Gambar Perhitungan Volume Urugan Pa
Panjang
Lebar
Tebal/Tinggi
Luas
Volume
Tanah
Peninggian 5 cm
Panjang (m) As Vertikal Panjang (m) Luas (m2)
2.8 1'C - 3C 3.432 9.610
1.5 4C'-5C' 1.67 2.505
6.715 7'B-8'B 0.9 6.044
2 8A-9A 1.2 2.400
4 9E-10E 2 8.000
3.085 7A-8A 6.8 20.978
3.917 A1'-A1 1 3.917
0.917 B'1-B'3 2 1.834
5.4 3A-4A 2.2 11.880
67.167
3.358
Tanah
Peninggian 10 cm
Panjang (m) As Vertikal Panjang (m) Luas (m2)
1.774 7'A-8'A 2.2 3.903
3.903
0.390
Tanah
Peninggian 90 cm
Panjang (m) As Vertikal Panjang (m) Luas (m2)
5.4 2A-5A 5.5 29.700
29.700
26.730
10 x 33 untuk border
Luas Lantai Keramik 10 x 33
1.954
10 x 33 untuk border
Luas Lantai Keramik 10 x 33
2.050
NO
1
G.1
G.2
G.3
G.4
G.5
G.6
G.7
G.8
G.9
G.10
G.11
G.12
Total Anggaran Biaya
No
1
1
2
3
4
5
6
Total
No
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Total
RENCANA ANGGARAN BIAYA
URUTAN PEKERJAAN
2
Pekerjaan 1 m3 Urugan Pasir Tebal 5 cm
Pekerjaan 1 m3 Pembuatan Beton Tumbuk 1 PC : 3 PS : 5 KRL
Pekerjaan 1m3 Urugan Tanah Peninggian Lantai
Pekerjaan Pemasangan 1 m2 Lantai Gracewood (Costal Dev Uk. 12 x 102 x 900 mm)
Pekerjaan Pemasangan 1m2 Lantai Keramik 50 x 50 Roman Polos
Pekerjaan Pemasangan 1m2 Lantai Keramik 33,3 x 33,3 Roman Polos
Pekerjaan Pemasangan 1m2 Lantai Keramik 30 x 30 Roman Polos
Pekerjaan Pemasangan 1m2 Lantai Keramik 20x20 Roman Polos
Pekerjaan Pemasangan 1m2 Lantai Keramik 10 x 30 Roman Polos Untuk Border
Pekerjaan Pemasangan 1m' Plint Kayu Tebal 2 cm Lebar 10 cm
Pekerjaan Pemasangan 1m2 Paving Block Berwarna Tebal 6 cm ( Ubin Set 21x21x6)
Pekerjaan Pemasangan 1m2 Paving Block Berwarna Tebal 6cm (Uk. Bata 10,5x21x6)
Total Anggaran Biaya
Tenaga Kerja
2
Pekerja
Tukang Batu
Tukang Kayu
Kepala Tukang Batu
Kepala Tukang Kayu
Mandor
Total
Bahan
2
Pasir Urug
Semen Portland
Pasir Beton
Koral Beton
Tanah Urug
Grace Wood (Costul Dev Uk. 12 x 102 x 900 mm)
Lem Kayu
Keramik Ukuran 50x50 Roman Polos (Golongan A)
Keramik Ukuran 33,3 x 33,3 Roman Polos (Golongan A)
Keramik Ukuran 30 x 30 Roman Polos (Golongan B)
Keramik Ukuran 20 x 20 Roman Polos (Golongan A)
Keramik Ukuran 10 x 33 Roman Polos Untuk Border
Semen Warna
Pasir Pasang
Kayu Papan Borneo Super
Paku 5 cm - 7 cm
Paving Block Berwarna Tebal 6 cm (Ubin Set 21x21x6)
Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6)
Total
CANA ANGGARAN BIAYA PEKERJAAN LANTAI
Pekerja 4 Oh Rp 95,600.00
Tukang Kayu 12 Oh Rp 109,300.00
Kepala Tukang Kayu 1.2 Oh Rp 120,000.00
Mandor 0.2 Oh Rp 131,000.00
Balok Kayu Borneo Kelas II 1.1 m3 -
Besi Strip Tebal 5 mm 15 Kg -
Paku 12 cm 5.6 Kg -
JUMLAH
H.2 Pemasangan 1 m3 Konstruksi Gording Kayu Kelas II
- - Rp 382,400.00 - -
- - Rp 1,311,600.00 - -
- - Rp 144,000.00 - -
- - Rp 26,200.00 - -
Rp 4,750,000.00 - - Rp 5,225,000.00 -
Rp 32,000.00 - - Rp 480,000.00 -
Rp 15,000.00 - - Rp 84,000.00 -
Rp 1,864,200.00 Rp 5,789,000.00 -
- - Rp 640,520.00 - -
- - Rp 2,196,930.00 - -
- - Rp 241,200.00 - -
- - Rp 43,885.00 - -
Rp 4,750,000.00 - - Rp 5,225,000.00 -
Rp 32,000.00 - - Rp 480,000.00 -
Rp 15,000.00 - - Rp 45,000.00 -
Rp 3,122,535.00 Rp 5,750,000.00 -
las II
- - Rp 9,560.00 - -
- - Rp 10,930.00 - -
- - Rp 1,200.00 - -
- - Rp 655.00 - -
Rp 3,500,000.00 - - Rp 49,000.00 -
Rp 3,000,000.00 - - Rp 171,000.00 -
Rp 16,000.00 - - Rp 4,000.00 -
Rp 22,345.00 Rp 224,000.00 -
- - Rp 9,560.00 - -
- - Rp 21,860.00 - -
- - Rp 2,400.00 - -
- - Rp 655.00 - -
Rp 5,500,000.00 - - Rp 59,400.00 -
Rp 16,000.00 - - Rp 1,600.00 -
Rp 34,475.00 Rp 61,000.00 -
- - Rp 19,120.00 - -
- - Rp 10,930.00 - -
- - Rp 1,200.00 - -
- - Rp 1,310.00 - -
Rp 11,200.00 - - Rp 123,200.00 -
Rp 16,000.00 - - Rp 480.00 -
Rp 32,560.00 Rp 123,680.00 -
Jumlah (Rp) No Uraian Pekerjaan
11 = ( 8+9+10) 1 2
H
H.1 Pemasangan 1 m3 Konstruksi Kuda-Kuda Kayu Kelas II
Pekerja
Rp 382,400.00 Tukang Kayu
Rp 1,311,600.00 Kepala Tukang Kayu
Rp 144,000.00 Mandor
Rp 26,200.00 Balok Kayu Borneo Kelas II
Rp 5,225,000.00 Besi Strip Tebal 5 mm
Rp 480,000.00 Paku 12 cm
Rp 84,000.00
Rp 7,653,200.00
No Uraian Pekerjaan
Rp 640,520.00 1 2
Rp 2,196,930.00 H.2 Pemasangan 1 m3 Konstruksi Gording Kayu Kelas II
Rp 241,200.00 Pekerja
Rp 43,885.00 Tukang Kayu
Rp 5,225,000.00 Kepala Tukang Kayu
Rp 480,000.00 Mandor
Rp 45,000.00 Balok Kayu Borneo Kelas II
Rp 8,872,535.00 Besi Strip Tebal 5 mm
Paku 12 cm
Rp 9,560.00
Rp 10,930.00
No Uraian Pekerjaan
Rp 1,200.00
Rp 655.00 1 2
Rp 49,000.00 H.3 Pemasangan 1 m2 Rangka Atap Genting Kanmuri Kayu Kelas II
Rp 171,000.00 Pekerja
Rp 4,000.00 Tukang Kayu
Rp 246,345.00 Kepala Tukang Kayu
Mandor
Kaso-Kaso (5x7) cm
Rp 9,560.00 Reng (3x4) cm
Rp 21,860.00 Paku 5-7 cm
Rp 2,400.00
Rp 655.00
Rp 59,400.00
No Uraian Pekerjaan
Rp 1,600.00
Rp 95,475.00 1 2
H.4 Pemasangan 1m' Listplank Ukuran (3x20) cm Kayu Kelas II
Pekerja
Rp 19,120.00 Tukang Kayu
Rp 10,930.00 Kepala Tukang Kayu
Rp 1,200.00 Mandor
Rp 1,310.00 Papan Kayu Borneo Super
Rp 123,200.00 Paku 5-7 cm
Rp 480.00
Rp 156,240.00
No Uraian Pekerjaan
1 2
H.5 Pemasangan 1 m2 Penutup Atap Genting Kanmuri
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Genting Kanmuri Milenio
Paku 5-7 cm
REKAPITULASI KEBUTUHAN TENAGA KERJA DAN BAHAN
- 6.4989261499 - - Rp 621,297.34
- 19.4967784497 - - Rp 2,130,997.88
- 1.949677845 - - Rp 233,961.34
- 0.3249463075 - - Rp 42,567.97
- - 1.7872046912 - -
- - 24.3709730621 - -
- - 9.0984966098 - -
Jumlah Rp 3,028,824.53
Total Rp 12,434,
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)
- 11.5788864 - - Rp 1,106,941.54
- 34.7366592 - - Rp 3,796,716.85
- 3.47366592 - - Rp 416,839.91
- 0.57894432 - - Rp 75,841.71
- - 1.9010112 - -
- - 25.92288 - -
- - 5.184576 - -
Jumlah Rp 5,396,340.01
Total Rp 15,333,
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)
- 17.1343911 - - Rp 1,638,047.79
- 17.1343911 - - Rp 1,872,788.95
- 1.71343911 - - Rp 205,612.69
- 0.856719555 - - Rp 112,230.26
- - 2.398814754 - -
- - 9.766602927 - -
- - 42.83597775 - -
Jumlah Rp 3,828,679.69
Total Rp 42,209,
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)
- 5.7579 - - Rp 550,455.24
- 11.5158 - - Rp 1,258,676.94
- 1.15158 - - Rp 138,189.60
- 0.287895 - - Rp 37,714.25
- - 0.6218532 - -
- - 5.7579 - -
Jumlah Rp 1,985,036.03
Total Rp 5,497,
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)
- 34.2687822 - - Rp 3,276,095.58
- 17.1343911 - - Rp 1,872,788.95
- 1.71343911 - - Rp 205,612.69
- 1.71343911 - - Rp 224,460.52
- - 1884.783021 - -
- - 5.14031733 - -
Jumlah Rp 5,578,957.74
Total Rp 26,770,
Harga Material (Rp) KUDA-KUDA 1
Bahan Alat Kemiringan = 30.000
13 = (7 x 10) 14 = (8 x 11) Balok Tarik = 6.400
Kaki Kuda-Kuda = 3.695
Tiang Kuda-Kuda = 1.847
- - Balok Sokong = 1.555
- - Balok Gapit 1 = 0.659
- - Balok Gapit 2 = 1.252
- - Balok Nok = 3.600
Rp 8,489,222.28 -
Rp 779,871.14 -
Rp 136,477.45 -
Rp 9,405,570.87 -
12,434,395.40
Harga Material (Rp) KUDA-KUDA 2
Bahan Alat Kemiringan = 30.000
13 = (7 x 10) 14 = (8 x 11) Balok Tarik = 2.650
Kaki Kuda-Kuda = 3.060
- - Tiang Kuda-Kuda = 1.530
- - Balok Sokong = 1.376
- - Balok Gapit 1 = 0.558
- - Balok Gapit 2 = 0.956
Rp 9,029,803.20 - Balok Nok = 3.735
Rp 829,532.16 -
Rp 77,768.64 -
Rp 9,937,104.00 -
15,333,444.01
Harga Material (Rp) KUDA-KUDA 3
Bahan Alat Kemiringan = 30.000
13 = (7 x 10) 14 = (8 x 11) Balok Tarik = 3.933
Kaki Kuda-Kuda = 4.541
- - Tiang Kuda-Kuda = 2.270
- - Balok Sokong = 1.381
- - Balok Gapit 1 = 1.014
- - Balok Gapit 2 = 1.834
Rp 8,395,851.64 -
Rp 29,299,808.78 -
Rp 685,375.64 -
Rp 38,381,036.06 -
42,209,715.76 KUDA-KUDA 1/2 KD 1
Harga Material (Rp) Kemiringan = 30.000
Bahan Alat Balok Tarik = 3.200
13 = (7 x 10) 14 = (8 x 11) Kaki Kuda-Kuda = 3.695
Tiang Kuda-Kuda = 1.847
- - Balok Sokong = 1.555
- - Balok Gapit 1 = 0.659
- - Balok Gapit 2 = 1.252
- -
Rp 3,420,192.60 -
Rp 92,126.40 -
Rp 3,512,319.00 -
5,497,355.03 KUDA-KUDA 1/2 KD 2
Harga Material (Rp) Kemiringan = 30.000
Bahan Alat Balok Tarik = 2.650
13 = (7 x 10) 14 = (8 x 11) Kaki Kuda-Kuda = 3.060
Tiang Kuda-Kuda = 1.530
- - Balok Sokong = 1.376
- - Balok Gapit 1 = 0.558
- - Balok Gapit 2 = 0.956
- -
Rp 21,109,569.84 -
Rp 82,245.08 - VOLUME TOTAL
Rp 21,191,814.91 - KD 1 = 0.5024
26,770,772.65 KD 2 = 0.2157
KD 3 = 0.5750
1/2 KD 1 = 0.2344
1/2 KD 2 = 0.0972
TOTAL = 1.6247
PERHITUNGAN VOLUME PEKE
VOLUME KD 1
DA 1
o Bagian Konstruksi Kuda-Kuda Panjang (m) b (m) h (m) Jumlah
m Balok Tarik 3.2 0.08 0.12 2
m Kaki Kuda-Kuda 3.695 0.08 0.12 2
m Tiang Kuda-Kuda 1.847 0.08 0.12 1
m Balok Sokong 1.555 0.08 0.12 2
m Balok Gapit 1 0.659 0.08 0.12 2
m Balok Gapit 2 1.252 0.08 0.12 2
m Balok Nok 3.6 0.08 0.12 1
TOTAL VOLUME 1 KUDA KUDA TIPE KD1 (m3)
VOLUME KUDA KUDA TIPE KD1 (m3)
VOLUME KD 2
VOLUME KD 3
VOLUME 1/2 KD 1
1/2 KD 1 Bagian Konstruksi Kuda-Kuda Panjang (m) b (m) h (m) Jumlah
o Balok Tarik 3.200 0.08 0.12 1
m Kaki Kuda-Kuda 3.695 0.08 0.12 1
m Tiang Kuda-Kuda 1.847 0.08 0.12 1
m Balok Sokong 1.555 0.08 0.12 1
m Balok Gapit 1 0.659 0.08 0.12 1
m Balok Gapit 2 1.252 0.08 0.12 1
m TOTAL VOLUME 1 KUDA KUDA TIPE 1/2 KD 1 (m3)
VOLUME KUDA KUDA TIPE 1/2 KD 1 (m3)
VOLUME 1/2 KD 2
OTAL
m3
m3
m3
m3
m3
m3
UNGAN VOLUME PEKERJAAN ATAP
VOLUME GORDING
ME RANGKA ATAP
Ukuran (m)
Luas (m2)
Lebar Bawah Tinggi
- 4.113 16.919
11.826 4.113 31.724
- 4.242 17.808
- 3.815 13.295
- 3.815 14.554
4.113 16.919
- 3.815 13.295
- 4.46 46.830
(m2) 171.344
E PENUTUP ATAP
Ukuran (m)
Luas (m2)
Lebar Bawah Tinggi
- 4.113 16.919
11.826 4.113 31.724
- 4.242 17.808
- 3.815 13.295
- 3.815 14.554
4.113 16.919
- 3.815 13.295
- 4.46 46.830
(m2) 171.344
ME LISTPLANK
NO URUTAN PEKERJAAN
1 2
H.1 Pemasangan 1 m3 Konstruksi Kuda-Kuda Kayu Kelas II
H.2 Pemasangan 1 m3 Konstruksi Gording Kayu Kelas II
H.3 Pemasangan 1m2 Rangka Atap Genting Kanmuri Kayu Kelas II
H.4 Pemasangan 1m' Listplank Ukuran (3x20) cm Kayu Kelas II
H.5 Pemasangan 1 m2 Penutup Atap Genting Kanmuri
Total Anggaran Biaya
No Tenaga Kerja
1 2
1 Pekerja
2 Tukang Kayu
3 Kepala Tukang Kayu
4 Mandor
TOTAL
No Bahan
1 2
1 Balok Kayu Borneo Kelas II
2 Besi Strip Tebal 5 mm
3 Paku 12 cm
4 Kaso-Kaso (5x7) cm
5 Reng (3x4) cm
6 Paku 5-7 cm
7 Papan Kayu Borneo Super
8 Genting Kanmuri Milenio
TOTAL
RENCANA ANGGARAN BIAYA PEKERJAAN AT
- - Rp 9,560.00 - - Rp 9,560.00
- - Rp 5,465.00 - - Rp 5,465.00
- - Rp 600.00 - - Rp 600.00
- - Rp 655.00 - - Rp 655.00
Rp 65,000.00 - - Rp 23,660.00 - Rp 23,660.00
Rp 40,000.00 - - Rp 4,400.00 - Rp 4,400.00
Rp 16,280.00 Rp 28,060.00 - Rp 44,340.00
- - Rp 9,560.00 - - Rp 9,560.00
- - Rp 10,930.00 - - Rp 10,930.00
- - Rp 1,200.00 - - Rp 1,200.00
- - Rp 655.00 - - Rp 655.00
Rp 85,000.00 - - Rp 31,875.00 - Rp 31,875.00
Rp 20,000.00 - - Rp 600.00 - Rp 600.00
Rp 22,345.00 Rp 32,475.00 - Rp 54,820.00
- - Rp 4,780.00 - - Rp 4,780.00
- - Rp 5,465.00 - - Rp 5,465.00
- - Rp 600.00 - - Rp 600.00
- - Rp 393.00 - - Rp 393.00
Rp 21,000.00 - - Rp 23,100.00 - Rp 23,100.00
Rp 15,000.00 - - Rp 750.00 - Rp 750.00
Rp 11,238.00 Rp 23,850.00 - Rp 35,088.00
- - Rp 14,340.00 - - Rp 14,340.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
- - Rp 1,310.00 - - Rp 1,310.00
Rp 4,750,000.00 - - Rp 73,150.00 - Rp 73,150.00
Rp 16,000.00 - - Rp 3,200.00 - Rp 3,200.00
Rp 52,040.00 Rp 76,350.00 - Rp 128,390.00
- - Rp 2,868.00 - - Rp 2,868.00
- - Rp 3,279.00 - - Rp 3,279.00
- - Rp 360.00 - - Rp 360.00
- - Rp 131.00 - - Rp 131.00
Rp 14,000.00 - - Rp 14,700.00 - Rp 14,700.00
Rp 16,000.00 - - Rp 160.00 - Rp 160.00
Rp 6,638.00 Rp 14,860.00 - Rp 21,498.00
REKAPITULASI KEBUTUHAN TENA
Rp 95,600.00 - - 29.8979795 - -
Rp 109,300.00 - - 14.9489898 - -
Rp 120,000.00 - - 1.49489898 - -
Rp 131,000.00 - - 1.49489898 - -
- Rp 65,000.00 - - 108.8286454 -
- Rp 40,000.00 - - 32.88777745 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 4.1063895 - -
Rp 109,300.00 - - 4.1063895 - -
Rp 120,000.00 - - 0.41063895 - -
Rp 131,000.00 - - 0.20531948 - -
- Rp 85,000.00 - - 15.39896063 -
- Rp 20,000.00 - - 1.23191685 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - - 7.73515 - -
Rp 109,300.00 - - 7.73515 - -
Rp 120,000.00 - - 0.773515 - -
Rp 131,000.00 - - 0.464109 - -
- Rp 21,000.00 - - 170.1733 -
- Rp 15,000.00 - - 7.73515 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - 44.8469693 - -
Rp 109,300.00 - 89.6939385 - -
Rp 120,000.00 - 8.96939385 - -
Rp 131,000.00 - 2.98979795 - -
- Rp 4,750,000.00 - 4.604288843 -
- Rp 16,000.00 - 59.795959 -
Jumlah
Total
Harga Satuan (Rp) Jumlah yang Dibutuhkan
Upah Bahan Alat Upah Bahan Alat
6 7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4)
Rp 95,600.00 - 1.38282 - -
Rp 109,300.00 - 1.38282 - -
Rp 120,000.00 - 0.138282 - -
Rp 131,000.00 - 0.046094 - -
- Rp 14,000.00 - 48.3987 -
- Rp 16,000.00 - 0.46094 -
Jumlah
Total
D
No
Rp 2,858,246.84 - -
1
Rp 1,633,924.58 - -
Rp 179,387.88 - - 2
Rp 195,831.77 - - 3
- Rp 7,073,861.95 - 4
- Rp 1,315,511.10 - 5
Rp 4,867,391.06 Rp 8,389,373.05 - 6
Rp 13,256,764.11 7
Harga Material (Rp) 8
Upah Bahan Alat 9
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11) 10
11
Rp 392,570.84 - - 12
Rp 448,828.37 - -
Rp 49,276.67 - -
Rp 26,896.85 - -
- Rp 1,308,911.65 -
- Rp 24,638.34 -
Rp 917,572.73 Rp 1,333,549.99 -
Rp 2,251,122.72
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 739,480.34 - -
Rp 845,451.90 - -
Rp 92,821.80 - -
Rp 60,798.28 - -
- Rp 3,573,639.30 -
- Rp 116,027.25 -
Rp 1,738,552.31 Rp 3,689,666.55 -
Rp 5,428,218.86
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 4,287,370.26 - -
Rp 9,803,547.48 - -
Rp 1,076,327.26 - -
Rp 391,663.53 - -
- Rp 21,870,372.00 -
- Rp 956,735.34 -
Rp 15,558,908.53 Rp 22,827,107.35 -
Rp 38,386,015.88
Harga Material (Rp)
Upah Bahan Alat
12 = (6 x 9) 13 = (7 x 10) 14 = (8 x 11)
Rp 132,197.59 - -
Rp 151,142.23 - -
Rp 16,593.84 - -
Rp 6,038.31 - -
- Rp 677,581.80 -
- Rp 7,375.04 -
Rp 305,971.97 Rp 684,956.84 -
Rp 990,928.81
No Elevasi (m)
1 1.90
2 3.00
3 3.00
4 2.70
5 3.00
6 3.00
7 3.00
8 3.00
9 3.00
10 3.00
11 3.00
12 3.00
TOTAL VOLU
No
1
2
3
4
5
Total
PERH
Pemasangan 1 m2 Langit
LANTAI 1
Pemasangan 1 m2
Pemasangan
LANTAI 1 LANTAI 2
LANTAI 1
Pemasangan Li
Panjang (m) No Panjang (m)
6.594 1 9.902
9.695 Total 9.902
10.208
5.495
4.2
36.192
PERHITUNGAN VOLUME PEKERJAAN PLAFOND
LANTAI 2
LANTAI 2
LANTAI 2
No
1
1
2
3
4
TOTAL
No
1
1
2
3
4
5
g Ruang Tidur 6
Luas (m2) 7
2.374 8
4.977 9
TOTAL
7.351
RENCAN
HARGA SATUAN
URUTAN PEKERJAAN VOL SAT
UPAH
2 3 4 5
Pemasangan 1m2 Langit-Langit Gypsum Board T.9mm 298.980 m2 Rp 16,280.00
Pemasangan 1 m2 Langit - Langit Tripleks Tebal 6 mm 41.064 m2 Rp 22,345.00
Pemasangan 1 m' List Plafond Gypsum 154.703 m' Rp 11,238.00
Pemasangan 1m2 Rangka Plafond Kayu Borneo 5/7 298.980 m2 Rp 52,040.00
Pemasangan 1m' List Plafond Kayu Profil 46.094 m' Rp 6,638.00
Total Anggaran Biaya
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 1,100.00 - - Rp 2,200.00 - Rp 2,200.00
Rp 200.00 - - Rp 4,800.00 - Rp 4,800.00
Rp 56,900.00 - - Rp 56,900.00 - Rp 56,900.00
Rp 36,390.00 Rp 247,650.00 - Rp 284,040.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 15,000.00 - - Rp 15,000.00 - Rp 15,000.00
Rp 36,390.00 Rp 198,750.00 - Rp 235,140.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 17,500.00 - - Rp 17,500.00 - Rp 17,500.00
Rp 36,390.00 Rp 201,250.00 - Rp 237,640.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 25,900.00 - - Rp 25,900.00 - Rp 25,900.00
Rp 36,390.00 Rp 209,650.00 - Rp 246,040.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 15,000.00 - - Rp 15,000.00 - Rp 15,000.00
Rp 36,390.00 Rp 198,750.00 - Rp 235,140.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 34,800.00 - - Rp 34,800.00 - Rp 34,800.00
Rp 36,390.00 Rp 218,550.00 - Rp 254,940.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 42,000.00 - - Rp 42,000.00 - Rp 42,000.00
Rp 36,390.00 Rp 225,750.00 - Rp 262,140.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 38,000.00 - - Rp 38,000.00 - Rp 38,000.00
Rp 36,390.00 Rp 221,750.00 - Rp 258,140.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 35,000.00 - - Rp 35,000.00 - Rp 35,000.00
Rp 36,390.00 Rp 218,750.00 - Rp 255,140.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 1,100.00 - - Rp 2,200.00 - Rp 2,200.00
Rp 200.00 - - Rp 4,800.00 - Rp 4,800.00
Rp 62,500.00 - - Rp 62,500.00 - Rp 62,500.00
Rp 36,390.00 Rp 253,250.00 - Rp 289,640.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 200.00 - - Rp 4,800.00 - Rp 4,800.00
Rp 300.00 - - Rp 900.00 - Rp 900.00
Rp 54,000.00 - - Rp 54,000.00 - Rp 54,000.00
Rp 15,000.00 - - Rp 15,000.00 - Rp 15,000.00
Rp 36,390.00 Rp 258,450.00 - Rp 294,840.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 5,250.00 - - Rp 15,750.00 - Rp 15,750.00
Rp 10,800.00 - - Rp 162,000.00 - Rp 162,000.00
Rp 6,000.00 - - Rp 6,000.00 - Rp 6,000.00
Rp 200.00 - - Rp 4,800.00 - Rp 4,800.00
Rp 300.00 - - Rp 900.00 - Rp 900.00
Rp 73,000.00 - - Rp 73,000.00 - Rp 73,000.00
Rp 22,500.00 - - Rp 22,500.00 - Rp 22,500.00
Rp 36,390.00 Rp 284,950.00 - Rp 321,340.00
- - Rp 32,790.00 - - Rp 32,790.00
- - Rp 3,600.00 - - Rp 3,600.00
Rp 214,025.00 - - Rp 214,025.00 - Rp 214,025.00
Rp 36,390.00 Rp 214,025.00 - Rp 250,415.00
REKAPITULASI KEBUTUHAN TENAGA KE
- -
- -
Rp 173,250.00 -
Rp 1,782,000.00 -
Rp 66,000.00 -
Rp 165,000.00 -
Rp 2,186,250.00 -
2,586,540.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
Rp 204,750.00 -
Rp 2,106,000.00 -
Rp 78,000.00 -
Rp 227,500.00 -
Rp 2,616,250.00 -
3,089,320.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
Rp 31,500.00 -
Rp 324,000.00 -
Rp 12,000.00 -
Rp 51,800.00 -
Rp 419,300.00 -
492,080.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
Rp 425,250.00 -
Rp 4,374,000.00 -
Rp 162,000.00 -
Rp 405,000.00 -
Rp 5,366,250.00 -
6,348,780.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
-
-
Rp 110,250.00 -
Rp 1,134,000.00 -
Rp 42,000.00 -
Rp 243,600.00 -
Rp 1,529,850.00 -
1,784,580.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
Rp 63,000.00 -
Rp 648,000.00 -
Rp 24,000.00 -
Rp 168,000.00 -
Rp 903,000.00 -
1,048,560.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
Rp 63,000.00 -
Rp 648,000.00 -
Rp 24,000.00 -
Rp 140,000.00 -
Rp 875,000.00 -
1,020,560.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
Rp 47,250.00 -
Rp 486,000.00 -
Rp 18,000.00 -
Rp 105,000.00 -
Rp 656,250.00 -
765,420.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
Rp 31,500.00 -
Rp 324,000.00 -
Rp 12,000.00 -
Rp 4,400.00 -
Rp 9,600.00 -
Rp 125,000.00 -
Rp 506,500.00 -
579,280.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
Rp 409,500.00 -
Rp 4,212,000.00 -
Rp 156,000.00 -
Rp 124,800.00 -
Rp 23,400.00 -
Rp 1,404,000.00 -
Rp 390,000.00 -
Rp 6,719,700.00 -
7,665,840.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
Rp 31,500.00 -
Rp 324,000.00 -
Rp 12,000.00 -
Rp 9,600.00 -
Rp 1,800.00 -
Rp 146,000.00 -
Rp 45,000.00 -
Rp 569,900.00 -
642,680.00
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
Rp 428,050.00 -
Rp 428,050.00 -
500,830.00
VOLUME PEKERJAAN ELEKTRIKAL
NO
Nama Barang Jumlah Satuan
KWH Meter 1 Buah 1
Saklar Tunggal 11 Buah J.1
Saklar Ganda 13 Buah J.2
Saklar Hotel 2 Buah J.3
Stop Kontak 27 Buah J.4
Stop Kontak AC 7 Buah J.5
Stop Kontak Waterproof 4 Buah J.6
Stop Kontak Antena TV 4 Buah J.7
Stop Kotak Telepon 3 Buah J.8
Kotak Pembagi (Distributor Point) 2 Buah J.9
Lampu Downlight Panasonic 4 Inch 26 Buah J.10
Lampu LED TL Phillips 2 Buah J.11
Lampu Taman 2 Buah J.12
J.13
No
1
1
2
No
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
RENCANA ANGGARAN
HARGA SATUAN
URUTAN PEKERJAAN VOL SAT
UPAH
2 3 4 5
Pemasangan MCB (KWH Meter ) 1 Buah Rp 36,390.00
Pemasangan Saklar Tunggal 11 Buah Rp 36,390.00
Pemasangan Saklar Ganda 13 Buah Rp 36,390.00
Pemasangan Saklar Hotel 2 Buah Rp 36,390.00
Pemasangan Stop Kontak 27 Buah Rp 36,390.00
Pemasangan Stop Kontak AC 7 Buah Rp 36,390.00
Stop Kontak Waterproof 4 Buah Rp 36,390.00
Pemasangan Stop Kontak Antena TV 4 Buah Rp 36,390.00
Pemasangan Stop Kontak Telepon 3 Buah Rp 36,390.00
Pemasangan Kotak Pembagi (Distributor Point) 2 Buah Rp 36,390.00
Pemasangan Lampu Downlight Panasonic 4 Inch 26 Buah Rp 36,390.00
Pemasangan Lampu LED TL Phillips 2 Buah Rp 36,390.00
Pemasangan Lampu Taman 2 Buah Rp 36,390.00
Total Anggaran Biaya
1 2 3 4
K PEKERJAAN
K.1 Pemasangan 1 Buah Closet Duduk
Pekerja 3.3 Oh
Tukang Batu 1.1 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.16 Oh
Closet Duduk Warna Toto 1 Unit
Perlengkapan (6% dari bahan) 1 %
JUMLAH
K.2 Pemasangan 1 Buah Closet Jongkok
Pekerja 1 Oh
Tukang Batu 1.5 Oh
Kepala Tukang Batu 0.15 Oh
Mandor 0.16 Oh
Closet Jongkok Putih INA 1 Unit
Semen Portland 6 Kg
Pasir Pasang 0.01 m3
JUMLAH
K.3 Pemasangan 1 Buah Wastafel
Pekerja 1.2 Oh
Tukang Batu 1.45 Oh
Kepala Tukang Batu 0.15 Oh
Mandor 0.06 Oh
Wastafel Toto L 521V1A 1.2 Unit
Semen Portland 6 Kg
Pasir Pasang 0.01 m3
Perlengkapan (12% dari bahan) 1 %
JUMLAH
K.4 Pemasangan 1 Buah Bathtube
Pekerja 0.075 Oh
Tukang Batu 0.75 Oh
Kepala Tukang Batu 0.075 Oh
Mandor 0.003 Oh
Bathtube 1 Unit
Perlengkapan (20% dari bahan) 1 %
JUMLAH
K.5 Pemasangan 1 Buah Bak Mandi Teraso Volume 0,3 m3
Pekerja 3 Oh
Tukang Batu 4.5 Oh
Kepala Tukang Batu 0.05 Oh
Mandor 0.9 Oh
Bak Mandi Fiberglass 1 Unit
Perlengkapan (12% dari bahan) 1 %
JUMLAH
K.6 Pemasangan 1 Buah Bak Cuci Piring Stainlessteel
Pekerja 0.03 Oh
Tukang Batu 0.3 Oh
Kepala Tukang Batu 0.03 Oh
Mandor 0.015 Oh
Bak Cuci Piring 1 Unit
Waterdrain 1 Buah
JUMLAH
K.7 Pemasangan 1 Buah Floor Drain
Pekerja 0.01 Oh
Tukang Batu 0.1 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.005 Oh
Floor Drain 1 Unit
JUMLAH
K.8 Pemasangan 1 BuahJet Washer Closet
Pekerja 0.01 Oh
Tukang Batu 0.1 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.005 Oh
Jet Washer Closet 1 Unit
JUMLAH
K.9 Pemasangan 1 Buah Tandon Air
Pekerja 3 Oh
Tukang Batu 4.5 Oh
Kepala Tukang Batu 0.9 Oh
Mandor 0.9 Oh
Tandon Air 1000L 1 buah
Perlengkapan Tandon Air (12% dari Bahan) 1 %
JUMLAH
K.10 Pemasangan 1 Buah Kran Air Diameter 1/2" atau 3/4"
Pekerja 0.01 Oh
Tukang Batu 0.1 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.005 Oh
Kran Air 1 Buah
Seal Tape 0.025 Buah
JUMLAH
K.11 Pemasangan 1 Buah Jet Shower
Pekerja 0.12 Oh
Tukang Batu 1.6 Oh
Kepala Tukang Batu 0.002 Oh
Mandor 0.0001 Oh
Jet Shower 1 Buah
Perlengkapan 1 Set
JUMLAH
K.12 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1"
Pekerja 0.036 Oh
Tukang Batu 0.06 Oh
Kepala Tukang Batu 0.006 Oh
Mandor 0.002 Oh
Pipa PVC 1" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.13 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1/2"
Pekerja 0.036 Oh
Tukang Batu 0.06 Oh
Kepala Tukang Batu 0.006 Oh
Mandor 0.002 Oh
Pipa PVC 1/2" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.14 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3/4"
Pekerja 0.036 Oh
Tukang Batu 0.06 Oh
Kepala Tukang Batu 0.006 Oh
Mandor 0.002 Oh
Pipa PVC 3/4 " Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.15 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1 1/4 "
Pekerja 0.054 Oh
Tukang Batu 0.09 Oh
Kepala Tukang Batu 0.009 Oh
Mandor 0.003 Oh
Pipa PVC 1 1/4" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.16 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 2"
Pekerja 0.054 Oh
Tukang Batu 0.09 Oh
Kepala Tukang Batu 0.009 Oh
Mandor 0.003 Oh
Pipa PVC 2" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.17 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3"
Pekerja 0.081 Oh
Tukang Batu 0.135 Oh
Kepala Tukang Batu 0.0135 Oh
Mandor 0.004 Oh
Pipa PVC 3" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.18 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 4"
Pekerja 0.081 Oh
Tukang Batu 0.135 Oh
Kepala Tukang Batu 0.0135 Oh
Mandor 0.004 Oh
Pipa PVC 4" Rucika 1.2 m'
Perlengkapan (35% dari bahan) 1 %
JUMLAH
K.19 Pemasangan 1 Buah Bak Kontrol Pas. Bata 60 cm x 60 cm x 65 cm
Pekerja 3.2 Oh
Tukang Batu 1.15 Oh
Kepala Tukang Batu 0.011 Oh
Mandor 0.016 Oh
Bata Merah 123 Buah
Semen Portland 114 Kg
Pasir Pasang 0.184 m3
Pasir Beton 0.12 m3
Kerikil 0.033 m3
Baja Tulangan 4.85 Kg
JUMLAH
K.20 Pemasangan 1 Buah Septictank 2x1.5x2 m
Pekerja 2.16 Oh
Tukang Batu 0.72 Oh
Kepala Tukang Batu 0.072 Oh
Mandor 0.011 Oh
Semen Portland 114 kg
Pasir Pasang 0.184 m3
Bata Merah 30.446 bh
Pipa PVC 4" 9 m
Baja Tulangan 4.85 Kg
Pasir Beton 0.12 m3
Batu Split Pecah Mesin 1/2 0.033 m3
Galian Tanah 4.5 m3
Pipa GIP 1.5 1.2 m3
Galian Tanah untuk Rembesan 2.25 m2
Kerikil 1.05 m3
Pas. Ijuk 5.4 m2
Urugan Kembali/Perataan Tanah 1.13 m3
Plat Penutup Beton 0.3 m3
JUMLAH
Harga Satuan (Rp) Jumlah Harga (Rp)
Upah Bahan Alat Upah Bahan Alat
5 6 7 8 = (3 x 5) 9 = (3 x 6) 10 = (3 x 7)
PEKERJAAN SANITASI
Rp 95,600.00 - - Rp 315,480.00 - -
Rp 109,300.00 - - Rp 120,230.00 - -
Rp 120,000.00 - - Rp 1,200.00 - -
Rp 131,000.00 - - Rp 20,960.00 - -
- Rp 2,085,000.00 - - Rp 2,085,000.00 -
- Rp 125,100.00 - - Rp 125,100.00 -
H Rp 457,870.00 Rp 2,210,100.00 -
Rp 95,600.00 - - Rp 95,600.00 - -
Rp 109,300.00 - - Rp 163,950.00 - -
Rp 120,000.00 - - Rp 18,000.00 - -
Rp 131,000.00 - - Rp 20,960.00 - -
- Rp 151,250.00 - - Rp 151,250.00 -
- Rp 1,100.00 - - Rp 6,600.00 -
- Rp 224,500.00 - - Rp 2,245.00 -
H Rp 298,510.00 Rp 160,095.00 -
Rp 95,600.00 - - Rp 114,720.00 - -
Rp 109,300.00 - - Rp 158,485.00 - -
Rp 120,000.00 - - Rp 18,000.00 - -
Rp 131,000.00 - - Rp 7,860.00 - -
- Rp 2,602,000.00 - - Rp 3,122,400.00 -
- Rp 1,100.00 - - Rp 6,600.00 -
- Rp 224,500.00 - - Rp 2,245.00 -
- Rp 312,240.00 - - Rp 312,240.00 -
H Rp 299,065.00 Rp 3,443,485.00 -
Rp 95,600.00 - - Rp 7,170.00 - -
Rp 109,300.00 - - Rp 81,975.00 - -
Rp 120,000.00 - - Rp 9,000.00 - -
Rp 131,000.00 - - Rp 393.00 - -
- Rp 2,500,000.00 - - Rp 2,500,000.00 -
- Rp 500,000.00 - - Rp 500,000.00 -
H Rp 98,538.00 Rp 3,000,000.00 -
Rp 95,600.00 - - Rp 286,800.00 - -
Rp 109,300.00 - - Rp 491,850.00 - -
Rp 120,000.00 - - Rp 6,000.00 - -
Rp 131,000.00 - - Rp 117,900.00 - -
- Rp 500,000.00 - - Rp 500,000.00 -
- Rp 60,000.00 - - Rp 60,000.00 -
H Rp 902,550.00 Rp 560,000.00 -
Rp 95,600.00 - - Rp 2,868.00 - -
Rp 109,300.00 - - Rp 32,790.00 - -
Rp 120,000.00 - - Rp 3,600.00 - -
Rp 131,000.00 - - Rp 1,965.00 - -
- Rp 195,400.00 - - Rp 195,400.00 -
- Rp 100,000.00 - - Rp 100,000.00 -
H Rp 41,223.00 Rp 295,400.00 -
Rp 95,600.00 - - Rp 956.00 - -
Rp 109,300.00 - - Rp 10,930.00 - -
Rp 120,000.00 - - Rp 1,200.00 - -
Rp 131,000.00 - - Rp 655.00 - -
- Rp 280,000.00 - - Rp 280,000.00 -
H Rp 13,741.00 Rp 280,000.00 -
Rp 95,600.00 - - Rp 956.00 - -
Rp 109,300.00 - - Rp 10,930.00 - -
Rp 120,000.00 - - Rp 1,200.00 - -
Rp 131,000.00 - - Rp 655.00 - -
- Rp 94,000.00 - - Rp 94,000.00 -
H Rp 13,741.00 Rp 94,000.00 -
Rp 95,600.00 - - Rp 286,800.00 - -
Rp 109,300.00 - - Rp 491,850.00 - -
Rp 120,000.00 - - Rp 108,000.00 - -
Rp 131,000.00 - - Rp 117,900.00 - -
- Rp 1,200,000.00 - - Rp 1,200,000.00 -
- Rp 144,000.00 - - Rp 144,000.00 -
H Rp 1,004,550.00 Rp 1,344,000.00 -
Rp 95,600.00 - - Rp 956.00 - -
Rp 109,300.00 - - Rp 10,930.00 - -
Rp 120,000.00 - - Rp 1,200.00 - -
Rp 131,000.00 - - Rp 655.00 - -
- Rp 176,000.00 - - Rp 176,000.00 -
- Rp 60,000.00 - - Rp 1,500.00 -
H Rp 13,741.00 Rp 177,500.00 -
Rp 95,600.00 - - Rp 11,472.00 - -
Rp 109,300.00 - - Rp 174,880.00 - -
Rp 120,000.00 - - Rp 240.00 - -
Rp 131,000.00 - - Rp 13.10 - -
- Rp 94,000.00 - - Rp 94,000.00 -
- Rp 80,000.00 - - Rp 80,000.00 -
H Rp 186,605.10 Rp 174,000.00 -
Rp 95,600.00 - - Rp 3,441.60 - -
Rp 109,300.00 - - Rp 6,558.00 - -
Rp 120,000.00 - - Rp 720.00 - -
Rp 131,000.00 - - Rp 262.00 - -
- Rp 14,125.00 - - Rp 16,950.00 -
- Rp 4,943.75 - - Rp 4,943.75 -
H Rp 10,981.60 Rp 21,893.75 -
Rp 95,600.00 - - Rp 3,441.60 - -
Rp 109,300.00 - - Rp 6,558.00 - -
Rp 120,000.00 - - Rp 720.00 - -
Rp 131,000.00 - - Rp 262.00 - -
- Rp 8,125.00 - - Rp 9,750.00 -
- Rp 2,843.75 - - Rp 2,843.75 -
H Rp 10,981.60 Rp 12,593.75 -
Rp 95,600.00 - - Rp 3,441.60 - -
Rp 109,300.00 - - Rp 6,558.00 - -
Rp 120,000.00 - - Rp 720.00 - -
Rp 131,000.00 - - Rp 262.00 - -
- Rp 10,000.00 - - Rp 12,000.00 -
- Rp 3,500.00 - - Rp 3,500.00 -
H Rp 10,981.60 Rp 15,500.00 -
Rp 95,600.00 - - Rp 5,162.40 - -
Rp 109,300.00 - - Rp 9,837.00 - -
Rp 120,000.00 - - Rp 1,080.00 - -
Rp 131,000.00 - - Rp 393.00 - -
- Rp 16,250.00 - - Rp 19,500.00 -
- Rp 5,687.50 - - Rp 5,687.50 -
H Rp 16,472.40 Rp 25,187.50 -
Rp 95,600.00 - - Rp 5,162.40 - -
Rp 109,300.00 - - Rp 9,837.00 - -
Rp 120,000.00 - - Rp 1,080.00 - -
Rp 131,000.00 - - Rp 393.00 - -
- Rp 38,500.00 - - Rp 46,200.00 -
- Rp 13,475.00 - - Rp 13,475.00 -
H Rp 16,472.40 Rp 59,675.00 -
Rp 95,600.00 - - Rp 7,743.60 - -
Rp 109,300.00 - - Rp 14,755.50 - -
Rp 120,000.00 - - Rp 1,620.00 - -
Rp 131,000.00 - - Rp 524.00 - -
- Rp 58,750.00 - - Rp 70,500.00 -
- Rp 20,562.50 - - Rp 20,562.50 -
H Rp 24,643.10 Rp 91,062.50 -
Rp 95,600.00 - - Rp 7,743.60 - -
Rp 109,300.00 - - Rp 14,755.50 - -
Rp 120,000.00 - - Rp 1,620.00 - -
Rp 131,000.00 - - Rp 524.00 - -
- Rp 95,000.00 - - Rp 114,000.00 -
- Rp 33,250.00 - - Rp 33,250.00 -
H Rp 24,643.10 Rp 147,250.00 -
m x 65 cm
Rp 95,600.00 - - Rp 305,920.00 - -
Rp 109,300.00 - - Rp 125,695.00 - -
Rp 120,000.00 - - Rp 1,320.00 - -
Rp 131,000.00 - - Rp 2,096.00 - -
- Rp 700.00 - - Rp 86,100.00 -
- Rp 1,100.00 - - Rp 125,400.00 -
- Rp 224,500.00 - - Rp 41,308.00 -
- Rp 250,000.00 - - Rp 30,000.00 -
- Rp 250,000.00 - - Rp 8,250.00 -
- Rp 12,000.00 - - Rp 58,200.00 -
H Rp 435,031.00 Rp 349,258.00 -
Rp 95,600.00 - - Rp 206,496.00 - -
Rp 109,300.00 - - Rp 78,696.00 - -
Rp 120,000.00 - - Rp 8,640.00 - -
Rp 131,000.00 - - Rp 1,441.00 - -
- Rp 1,100.00 - - Rp 125,400.00 -
- Rp 224,500.00 - - Rp 41,308.00 -
- Rp 700.00 - - Rp 21,312.20 -
- Rp 95,000.00 - - Rp 855,000.00 -
- Rp 12,000.00 - - Rp 58,200.00 -
- Rp 250,000.00 - - Rp 30,000.00 -
- Rp 250,000.00 - - Rp 8,250.00 -
- Rp 70,000.00 - - Rp 315,000.00 -
- Rp 75,000.00 - - Rp 90,000.00 -
- Rp 56,814.00 - - Rp 127,831.50 -
- Rp 250,000.00 - - Rp 262,500.00 -
- Rp 250,000.00 - - Rp 1,350,000.00 -
- Rp 50,000.00 - - Rp 56,500.00 -
- Rp 2,537,064.00 - - Rp 761,119.20 -
H Rp 295,273.00 Rp 4,102,420.90 -
Jumlah (Rp) No Uraian Pekerjaan
11 = ( 8+9+10) 1 2
K
K.1 Pemasangan 1 Buah Closet Duduk
Rp 315,480.00 Pekerja
Rp 120,230.00 Tukang Batu
Rp 1,200.00 Kepala Tukang Batu
Rp 20,960.00 Mandor
Rp 2,085,000.00 Closet Duduk Warna Toto
Rp 125,100.00 Perlengkapan (6% dari bahan)
Rp 2,667,970.00
Rp 95,600.00
No Uraian Pekerjaan
Rp 163,950.00
Rp 18,000.00 1 2
Rp 20,960.00 K.2 Pemasangan 1 Buah Closet Jongkok
Rp 151,250.00 Pekerja
Rp 6,600.00 Tukang Batu
Rp 2,245.00 Kepala Tukang Batu
Rp 458,605.00 Mandor
Closet Jongkok Putih INA
Rp 114,720.00 Semen Portland
Rp 158,485.00 Pasir Pasang
Rp 18,000.00
Rp 7,860.00
Rp 3,122,400.00
No Uraian Pekerjaan
Rp 6,600.00
Rp 2,245.00 1 2
Rp 312,240.00 K.3 Pemasangan 1 Buah Wastafel
Rp 3,742,550.00 Pekerja
Tukang Batu
Rp 7,170.00 Kepala Tukang Batu
Rp 81,975.00 Mandor
Rp 9,000.00 Wastafel Toto L 521V1A
Rp 393.00 Semen Portland
Rp 2,500,000.00 Pasir Pasang
Rp 500,000.00 Perlengkapan (12% dari bahan)
Rp 3,098,538.00
Rp 286,800.00
No Uraian Pekerjaan
Rp 491,850.00
Rp 6,000.00 1 2
Rp 117,900.00 K.4 Pemasangan 1 Buah Bathtube
Rp 500,000.00 Pekerja
Rp 60,000.00 Tukang Batu
Rp 1,462,550.00 Kepala Tukang Batu
Mandor
Rp 2,868.00 Bathtube
Rp 32,790.00 Perlengkapan (20% dari bahan)
Rp 3,600.00
Rp 1,965.00
Rp 195,400.00
No Uraian Pekerjaan
Rp 100,000.00
Rp 336,623.00 1 2
K.5 Pemasangan 1 Buah Bak Mandi Teraso Volume 0,3 m3
Rp 956.00 Pekerja
Rp 10,930.00 Tukang Batu
Rp 1,200.00 Kepala Tukang Batu
Rp 655.00 Mandor
Rp 280,000.00 Bak Mandi Fiberglass
Rp 293,741.00 Perlengkapan (12% dari bahan)
Rp 956.00
Rp 10,930.00
No Uraian Pekerjaan
Rp 1,200.00
Rp 655.00 1 2
Rp 94,000.00 K.6 Pemasangan 1 Buah Bak Cuci Piring Stainlessteel
Rp 107,741.00 Pekerja
Tukang Batu
Rp 286,800.00 Kepala Tukang Batu
Rp 491,850.00 Mandor
Rp 108,000.00 Bak Cuci Piring
Rp 117,900.00 Waterdrain
Rp 1,200,000.00
Rp 144,000.00
Rp 2,348,550.00
No Uraian Pekerjaan
Rp 956.00 1 2
Rp 10,930.00 K.7 Pemasangan 1 Buah Floor Drain
Rp 1,200.00 Pekerja
Rp 655.00 Tukang Batu
Rp 176,000.00 Kepala Tukang Batu
Rp 1,500.00 Mandor
Rp 191,241.00 Floor Drain
Rp 11,472.00
Rp 174,880.00
No Uraian Pekerjaan
Rp 240.00
Rp 13.10 1 2
Rp 94,000.00 K.8 Pemasangan 1 Buah Jet Washer Closet
Rp 80,000.00 Pekerja
Rp 360,605.10 Tukang Batu
Kepala Tukang Batu
Rp 3,441.60 Mandor
Rp 6,558.00 Jet Washer Closet
Rp 720.00
Rp 262.00
Rp 16,950.00
No Uraian Pekerjaan
Rp 4,943.75
Rp 32,875.35 1 2
K.9 Pemasangan 1 Buah Tandon Air
Rp 3,441.60 Pekerja
Rp 6,558.00 Tukang Batu
Rp 720.00 Kepala Tukang Batu
Rp 262.00 Mandor
Rp 9,750.00 Tandon Air 1000L
Rp 2,843.75 Perlengkapan Tandon Air
Rp 23,575.35
Rp 3,441.60
No Uraian Pekerjaan
Rp 6,558.00
Rp 720.00 1 2
Rp 262.00 K.10 Pemasangan 1 Buah Kran Air Diameter 1/2" atau 3/4"
Rp 12,000.00 Pekerja
Rp 3,500.00 Tukang Batu
Rp 26,481.60 Kepala Tukang Batu
Mandor
Rp 5,162.40 Kran Air
Rp 9,837.00 Seal Tape
Rp 1,080.00
Rp 393.00
Rp 19,500.00
No Uraian Pekerjaan
Rp 5,687.50
Rp 41,659.90 1 2
K.11 Pemasangan 1 Buah Jet Shower
Rp 5,162.40 Pekerja
Rp 9,837.00 Tukang Batu
Rp 1,080.00 Kepala Tukang Batu
Rp 393.00 Mandor
Rp 46,200.00 Jet Shower
Rp 13,475.00 Perlengkapan
Rp 76,147.40
Rp 7,743.60
No Uraian Pekerjaan
Rp 14,755.50
Rp 1,620.00 1 2
Rp 524.00 K.12 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1"
Rp 70,500.00 Pekerja
Rp 20,562.50 Tukang Batu
Rp 115,705.60 Kepala Tukang Batu
Mandor
Rp 7,743.60 Pipa PVC 1" Rucika
Rp 14,755.50 Perlengkapan (35% dari bahan)
Rp 1,620.00
Rp 524.00
Rp 114,000.00
No Uraian Pekerjaan
Rp 33,250.00
Rp 171,893.10 1 2
K.13 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1/2"
Rp 305,920.00 Pekerja
Rp 125,695.00 Tukang Batu
Rp 1,320.00 Kepala Tukang Batu
Rp 2,096.00 Mandor
Rp 86,100.00 Pipa PVC 1/2" Rucika
Rp 125,400.00 Perlengkapan (35% dari bahan)
Rp 41,308.00
Rp 30,000.00
Rp 8,250.00
No Uraian Pekerjaan
Rp 58,200.00
Rp 784,289.00 1 2
K.14 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3/4"
Rp 206,496.00 Pekerja
Rp 78,696.00 Tukang Batu
Rp 8,640.00 Kepala Tukang Batu
Rp 1,441.00 Mandor
Rp 125,400.00 Pipa PVC 3/4 " Rucika
Rp 41,308.00 Perlengkapan (35% dari bahan)
Rp 21,312.20
Rp 855,000.00
Rp 58,200.00
No Uraian Pekerjaan
No Uraian Pekerjaan
Rp 30,000.00
Rp 8,250.00 1 2
Rp 315,000.00 K.15 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1 1/4 "
Rp 90,000.00 Pekerja
Rp 127,831.50 Tukang Batu
Rp 262,500.00 Kepala Tukang Batu
Rp 1,350,000.00 Mandor
Rp 56,500.00 Pipa PVC 1 1/4" Rucika
Rp 761,119.20 Perlengkapan (35% dari bahan)
Rp 4,397,693.90
No Uraian Pekerjaan
1 2
K.16 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 2"
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Pipa PVC 2" Rucika
Perlengkapan (35% dari bahan)
No Uraian Pekerjaan
1 2
K.17 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3"
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Pipa PVC 3" Rucika
Perlengkapan (35% dari bahan)
No Uraian Pekerjaan
1 2
K.18 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 4"
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Pipa PVC 4" Rucika
Perlengkapan (35% dari bahan)
No Uraian Pekerjaan
1 2
K.19 Pemasangan 1 Buah Bak Kontrol Pas. Bata 60 cm x 60 cm x 65 cm
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Bata Merah
Semen Portland
Pasir Pasang
Pasir Beton
Kerikil
Baja Tulangan
No Uraian Pekerjaan
1 2
K.20 Pemasangan 1 Buah Septictank 2x1.5x2 m
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Pasang
Bata Merah
Pipa PVC 4"
Baja Tulangan
Pasir Beton
Batu Split Pecah Mesin 1/2
Galian Tanah
Pipa GIP 1.5
Galian Tanah untuk Rembesan
Kerikil
Pas. Ijuk
Urugan Kembali/Perataan Tanah
Plat Penutup Beton
Harga Satuan (Rp)
an Pekerjaan Vol Koef Satuan
Upah Bahan
2 3 4 5 6 7
PEKERJAAN SANITASI
4 - Buah
3.3 Oh Rp 95,600.00 -
1.1 Oh Rp 109,300.00 -
0.01 Oh Rp 120,000.00 -
0.16 Oh Rp 131,000.00 -
1 Unit - Rp 2,085,000.00
1 % - Rp 125,100.00
- 13.2 - - Rp 1,261,920.00 -
- 4.4 - - Rp 480,920.00 -
- 0.04 - - Rp 4,800.00 -
- 0.64 - - Rp 83,840.00 -
- - 4 - - Rp 8,340,000.00
- - 4 - - Rp 500,400.00
Jumlah Rp 1,831,480.00 Rp 8,840,400.00
Total Rp 10,671,880.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 1 - - Rp 95,600.00 -
- 1.5 - - Rp 163,950.00 -
- 0.15 - - Rp 18,000.00 -
- 0.16 - - Rp 20,960.00 -
- - 1 - - Rp 151,250.00
- - 6 - - Rp 6,600.00
- - 0.01 - - Rp 2,245.00
Jumlah Rp 298,510.00 Rp 160,095.00
Total Rp 458,605.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 4.8 - - Rp 458,880.00 -
- 5.8 - - Rp 633,940.00 -
- 0.6 - - Rp 72,000.00 -
- 0.24 - - Rp 31,440.00 -
- - 4.8 - - Rp 12,489,600.00
- - 24 - - Rp 26,400.00
- - 0.04 - - Rp 8,980.00
- - 4 - - Rp 1,248,960.00
Jumlah Rp 1,196,260.00 Rp 13,773,940.00
Total Rp 14,970,200.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 0.15 - - Rp 14,340.00 -
- 1.5 - - Rp 163,950.00 -
- 0.15 - - Rp 18,000.00 -
- 0.006 - - Rp 786.00 -
- - 2 - - Rp 5,000,000.00
- - 2 - - Rp 1,000,000.00
Jumlah Rp 197,076.00 Rp 6,000,000.00
Total Rp 6,197,076.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 3 - - Rp 286,800.00 -
- 4.5 - - Rp 491,850.00 -
- 0.05 - - Rp 6,000.00 -
- 0.9 - - Rp 117,900.00 -
- - 1 - - Rp 500,000.00
- - 1 - - Rp 60,000.00
Jumlah Rp 902,550.00 Rp 560,000.00
Total Rp 1,462,550.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 0.03 - - Rp 2,868.00 -
- 0.3 - - Rp 32,790.00 -
- 0.03 - - Rp 3,600.00 -
- 0.015 - - Rp 1,965.00 -
- - 1 - - Rp 195,400.00
- - 1 - - Rp 100,000.00
Jumlah Rp 41,223.00 Rp 295,400.00
Total Rp 336,623.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 0.05 - - Rp 4,780.00 -
- 0.5 - - Rp 54,650.00 -
- 0.05 - - Rp 6,000.00 -
- 0.025 - - Rp 3,275.00 -
- - 5 - - Rp 1,400,000.00
Jumlah Rp 68,705.00 Rp 1,400,000.00
Total Rp 1,468,705.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 0.04 - - Rp 3,824.00 -
- 0.4 - - Rp 43,720.00 -
- 0.04 - - Rp 4,800.00 -
- 0.02 - - Rp 2,620.00 -
- - 4 - - Rp 376,000.00
Jumlah Rp 54,964.00 Rp 376,000.00
Total Rp 430,964.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 3 - - Rp 286,800.00 -
- 4.5 - - Rp 491,850.00 -
- 0.9 - - Rp 108,000.00 -
- 0.9 - - Rp 117,900.00 -
- - 1 - - Rp 1,200,000.00
- - 1 - - Rp 144,000.00
Jumlah Rp 1,004,550.00 Rp 1,344,000.00
Total Rp 2,348,550.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 0.05 - - Rp 4,780.00 -
- 0.5 - - Rp 54,650.00 -
- 0.05 - - Rp 6,000.00 -
- 0.025 - - Rp 3,275.00 -
- - 5 - - Rp 880,000.00
- - 0.125 - - Rp 7,500.00
Jumlah Rp 68,705.00 Rp 887,500.00
Total Rp 956,205.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 0.24 - - Rp 22,944.00 -
- 3.2 - - Rp 349,760.00 -
- 0.004 - - Rp 480.00 -
- 0.0002 - - Rp 26.20 -
- - 2 - - Rp 188,000.00
- - 2 - - Rp 160,000.00
Jumlah Rp 373,210.20 Rp 348,000.00
Total Rp 721,210.20
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 1.255932 - - Rp 120,067.10 -
- 2.09322 - - Rp 228,788.95 -
- 0.209322 - - Rp 25,118.64 -
- 0.069774 - - Rp 9,140.39 -
- - 41.8644 - - Rp 591,334.65
- - 34.887 - - Rp 172,472.61
Jumlah Rp 383,115.08 Rp 763,807.26
Total Rp 1,146,922.34
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 1.377792 - - Rp 131,716.92 -
- 2.29632 - - Rp 250,987.78 -
- 0.229632 - - Rp 27,555.84 -
- 0.076544 - - Rp 10,027.26 -
- - 45.9264 - - Rp 373,152.00
- - 38.272 - - Rp 108,836.00
Jumlah Rp 420,287.80 Rp 481,988.00
Total Rp 902,275.80
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 2.143332 - - Rp 204,902.54 -
- 3.57222 - - Rp 390,443.65 -
- 0.357222 - - Rp 42,866.64 -
- 0.119074 - - Rp 15,598.69 -
- - 71.4444 - - Rp 714,444.00
- - 59.537 - - Rp 208,379.50
Jumlah Rp 653,811.52 Rp 922,823.50
Total Rp 1,576,635.02
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 1.369602 - - Rp 130,933.95 -
- 2.28267 - - Rp 249,495.83 -
- 0.228267 - - Rp 27,392.04 -
- 0.076089 - - Rp 9,967.66 -
- - 30.4356 - - Rp 494,578.50
- - 25.363 - - Rp 144,252.06
Jumlah Rp 417,789.48 Rp 638,830.56
Total Rp 1,056,620.04
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 1.415178 - - Rp 135,291.02 -
- 2.35863 - - Rp 257,798.26 -
- 0.235863 - - Rp 28,303.56 -
- 0.078621 - - Rp 10,299.35 -
- - 31.4484 - - Rp 1,210,763.40
- - 26.207 - - Rp 353,139.33
Jumlah Rp 431,692.19 Rp 1,563,902.73
Total Rp 1,995,594.91
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 3.953205 - - Rp 377,926.40 -
- 6.588675 - - Rp 720,142.18 -
- 0.6588675 - - Rp 79,064.10 -
- 0.19522 - - Rp 25,573.82 -
- - 58.566 - - Rp 3,440,752.50
- - 48.805 - - Rp 1,003,552.81
Jumlah Rp 1,202,706.50 Rp 4,444,305.31
Total Rp 5,647,011.81
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 4.952988 - - Rp 473,505.65 -
- 8.25498 - - Rp 902,269.31 -
- 0.825498 - - Rp 99,059.76 -
- 0.244592 - - Rp 32,041.55 -
- - 73.3776 - - Rp 6,970,872.00
- - 61.148 - - Rp 2,033,171.00
Jumlah Rp 1,506,876.28 Rp 9,004,043.00
Total Rp 10,510,919.28
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 12.8 - - Rp 1,223,680.00 -
- 4.6 - - Rp 502,780.00 -
- 0.044 - - Rp 5,280.00 -
- 0.064 - - Rp 8,384.00 -
- - 492 - - Rp 344,400.00
- - 456 - - Rp 501,600.00
- - 0.736 - - Rp 165,232.00
- - 0.48 - - Rp 120,000.00
- - 0.132 - - Rp 33,000.00
- - 19.4 - - Rp 232,800.00
Jumlah Rp 1,740,124.00 Rp 1,397,032.00
Total Rp 3,137,156.00
n (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 2.16 - - Rp 206,496.00 -
- 0.72 - - Rp 78,696.00 -
- 0.072 - - Rp 8,640.00 -
- 0.011 - - Rp 1,441.00 -
- - 114 - - Rp 125,400.00
- - 0.184 - - Rp 41,308.00
- - 30.446 - - Rp 21,312.20
- - 9 - - Rp 855,000.00
- - 4.85 - - Rp 58,200.00
- - 0.12 - - Rp 30,000.00
- - 0.033 - Rp 8,250.00
- - 4.5 - - Rp 315,000.00
- - 1.2 - - Rp 90,000.00
- - 2.25 - - Rp 127,831.50
- - 1.05 - - Rp 262,500.00
- - 5.4 - - Rp 1,350,000.00
- - 1.13 - - Rp 56,500.00
- - 0.3 - - Rp 761,119.20
Jumlah Rp 295,273.00 Rp 4,102,420.90
Total Rp 4,397,693.90
rial (Rp)
Alat
14 = (8 x 11)
No Nama Bahan
1 Closet Duduk
- 2 Closet Jongkok
- 3 Wastafel
- 4 Bathtube
- 5 Bak Mandi Teraso
- 6 Bak cuci piring
- 7 Floor Drain
- 8 Jet Washer Closet
10,671,880.00 9 Tandon Air
rial (Rp) 10 Kran Air
Alat 11 Jet Shower
14 = (8 x 11) 12 Bak Kontrol
13 Septic Tank
-
-
-
-
-
-
-
-
458,605.00
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
-
-
14,970,200.00
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
6,197,076.00
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
1,462,550.00
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
336,623.00
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
1,468,705.00
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
430,964.00
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
2,348,550.00
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
956,205.00
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
721,210.20
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
1,146,922.34
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
902,275.80
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
1,576,635.02
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
1,056,620.04
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
1,995,594.91
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
5,647,011.81
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
10,510,919.28
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
-
-
-
-
3,137,156.00
rial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4,397,693.90
Jumlah (buah) No Jenis Pipa Panjang (m) Pipa Ai
4 1 Pipa 1" No
1 2 Pipa 1/2" 1
4 3 Pipa 3/4" 2
2 4 Pipa 1 1/4" 3
1 5 Pipa 2" 4
1 6 Pipa 3" 5
5 7 Pipa 4" 6
4 7
1 8
5 Total (m)
2
4
1
Pipa A
No
1
2
3
4
5
6
7
Total (m)
Pipa Air
No
1
2
Total (m)
Pipa Air
No
1
2
3
4
Total (m)
Pipa A
No
1
2
Total (m)
Pipa Ai
No
1
2
3
4
Total (m)
Pipa Air
No
1
2
3
Total (m)
VOLUME PEKERJAAN SANITASI
Pipa Air Kotor d 2" Lantai 1 Pipa Air Kotor d 2" Lantai 2
Panjang Horizontal (m) Panjang Vertikal (m) No Panjang Horizontal (m)
1.51 1 1.199
5.1 0.9 2 0.852
0.631 0.2 3 2.16
1.414 0.2 4 0.594
6.992 5 0.25
0.637 6 0.768
Total (m) 17.584 Total (m)
Pipa Air Kotor d 3" Lantai 1 Pipa Air Kotor d 3" Lantai 2
Panjang Horizontal (m) Panjang Vertikal (m) No Panjang Horizontal (m)
0.432 1 4.695
5.564 Total (m)
9.916
5.455
4.718 1.45
0.314
5.535
0.236
6.116 0.3
0.874 3.2
Total (m) 44.11
Pipa Air Kotor d4" Lantai 1 Pipa Air Kotor d4" Lantai 2
Panjang Horizontal (m) Panjang Vertikal (m) No Panjang Horizontal (m)
1.56 1 1.72
0.38 2 1.641
5.866 3 4.05
0.296 4 2.407
5.572 1.9 Total (m)
2.41 3.2
9.173
5.33
0.404
8.595 0.25
0.124
3.97 0.7
Total (m) 49.73
ISOMETRI PIPA 1/2" (Warna Biru)
0.8
8.623
4.695
Kotor d4" Lantai 2
Panjang Vertikal (m)
0.8
0.8
11.418
NO
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
URUTAN PEKERJAAN VOL SAT
2 3 4
Pemasangan Closet Duduk 4 Buah
Pemasangan Closet Jongkok 1 Buah
Pemasangan Wastafel 4 Buah
Pemasangan Bathtube 2 Buah
Pemasangan Bak Mandi Teraso Volume 0,3 m3 1 Buah
Pemasangan Bak Cuci Piring Stainlessteel 1 Buah
Pemasangan Floor Drain 5 Buah
Pemasangan Jet Washer Closet 4 Buah
Pemasangan Tandon Air 1 Buah
Pemasangan Kran Air Diameter 1/2" atau 3/4" 5 Buah
Pemasangan Jet Shower 2 Buah
Pemasangan Pipa PVC Tipe AW Diameter 1" 34.887 m
Pemasangan Pipa PVC Tipe AW Diameter 1/2" 38.272 m
Pemasangan Pipa PVC Tipe AW Diameter 3/4" 59.537 m
Pemasangan Pipa PVC Tipe AW Diameter 1 1/4 " 25.363 m
Pemasangan Pipa PVC Tipe AW Diameter 2" 26.207 m
Pemasangan Pipa PVC Tipe AW Diameter 3" 48.805 m
Pemasangan Pipa PVC Tipe AW Diameter 4" 61.148 m
Pemasangan Bak Kontrol Pas. Bata 60 cm x 60 cm x 65 cm 4 Buah
Pemasangan Septictank 2x1.5x2 m 1 Buah
Total Anggaran Biaya
RENCANA ANGGA
Rp 95,600.00 - - Rp 23,900.00 - -
Rp 109,300.00 - - Rp 27,325.00 - -
Rp 120,000.00 - - Rp 3,000.00 - -
Rp 131,000.00 - - Rp 1,703.00 - -
- Rp 25,000.00 - - Rp 27,500.00 -
- Rp 3,000.00 - - Rp 12,000.00 -
- Rp 4,000,000.00 - - Rp 48,000.00 -
Rp 55,928.00 Rp 87,500.00 -
Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 325,000.00 - - Rp 341,250.00 -
- Rp 15,000.00 - - Rp 9,000.00 -
Rp 113,960.00 Rp 350,250.00 -
Rp 95,600.00 - - Rp 11,472.00 - -
Rp 109,300.00 - - Rp 13,116.00 - -
Rp 120,000.00 - - Rp 1,440.00 - -
Rp 131,000.00 - - Rp 786.00 - -
- Rp 5,500,000.00 - - Rp 16,500.00 -
- Rp 16,000.00 - - Rp 800.00 -
Rp 26,814.00 Rp 17,300.00 -
Rp 95,600.00 - - Rp 23,900.00 - -
Rp 109,300.00 - - Rp 27,325.00 - -
Rp 120,000.00 - - Rp 3,000.00 - -
Rp 131,000.00 - - Rp 1,703.00 - -
- Rp 25,000.00 - - Rp 87,500.00 -
- Rp 230,000.00 - - Rp 62,284.00 -
Rp 55,928.00 Rp 149,784.00 -
Rp 95,600.00 - - Rp 5,162.40 - -
Rp 109,300.00 - - Rp 9,837.00 - -
Rp 120,000.00 - - Rp 1,080.00 - -
Rp 131,000.00 - - Rp 3,537.00 - -
- Rp 65,500.00 - - Rp 78,600.00 -
- Rp 18,000.00 - - Rp 6,300.00 -
Rp 19,616.40 Rp 84,900.00 -
Rp 95,600.00 - - Rp 66,920.00 - -
Rp 109,300.00 - - Rp 38,255.00 - -
Rp 120,000.00 - - Rp 4,200.00 - -
Rp 131,000.00 - - Rp 4,585.00 - -
- Rp 9,000.00 - - Rp 9,900.00 -
- Rp 1,100.00 - - Rp 12,925.00 -
- Rp 224,500.00 - - Rp 7,857.50 -
Rp 113,960.00 Rp 30,682.50 -
Rp 95,600.00 - - Rp 49,712.000 - -
Rp 109,300.00 - - Rp 28,418.000 - -
Rp 120,000.00 - - Rp 3,120.000 - -
Rp 131,000.00 - - Rp 3,406.000 - -
- Rp 3,000,000.00 - - Rp 120,000.000 -
- Rp 15,000.00 - - Rp 4,500.000 -
- Rp 16,500.00 - - Rp 1,650.000 -
Rp 84,656.00 Rp 126,150.00 -
Rp 95,600.00 - - Rp 157,740.00 - -
Rp 109,300.00 - - Rp 30,057.50 - -
Rp 120,000.00 - - Rp 3,360.00 - -
Rp 131,000.00 - - Rp 10,873.00 - -
- Rp 1,100.00 - - Rp 422,400.00 -
- Rp 250,000.00 - - Rp 123,575.00 -
- Rp 224,500.00 - - Rp 172,775.20 -
Rp 202,030.50 Rp 718,750.20 -
pur Bersih
Rp 95,600.00 - - Rp 28,680.00 - -
Rp 109,300.00 - - Rp 16,395.00 - -
Rp 120,000.00 - - Rp 1,800.00 - -
Rp 131,000.00 - - Rp 1,965.00 - -
- Rp 1,100.00 - - Rp 6,864.00 -
- Rp 224,500.00 - - Rp 5,388.00 -
Rp 48,840.00 Rp 12,252.00 -
Rp 95,600.00 - - Rp 19,120.00 - -
Rp 109,300.00 - - Rp 10,930.00 - -
Rp 120,000.00 - - Rp 1,200.00 - -
Rp 131,000.00 - - Rp 1,310.00 - -
- Rp 1,100.00 - - Rp 3,575.00 -
Rp 32,560.00 Rp 3,575.00 -
Golongan C
Rp 95,600.00 - - Rp 86,040.00 - -
Rp 109,300.00 - - Rp 49,185.00 - -
Rp 120,000.00 - - Rp 5,400.00 - -
Rp 131,000.00 - - Rp 5,895.00 - -
- Rp 4,675.00 - - Rp 93,500.00 -
- Rp 1,100.00 - - Rp 10,230.00 -
- Rp 224,500.00 - - Rp 4,041.00 -
- Rp 15,000.00 - - Rp 29,100.00 -
Rp 146,520.00 Rp 136,871.00 -
REKA
Rp 11,472.00
Rp 13,116.00
No Uraian Pekerjaan
Rp 1,440.00
Rp 786.00 1 2
Rp 16,500.00 L.3 Pemasangan 1 m2 Lantai Kayu Untuk Anak Tangga
Rp 800.00 Pekerja
Rp 44,114.00 Tukang Kayu
Kepala Tukang Kayu
Rp 23,900.00 Mandor
Rp 27,325.00 Kayu Papan Borneo Super
Rp 3,000.00 Paku 5 cm - 7 cm
Rp 1,703.00
Rp 87,500.00
Rp 62,284.00
No Uraian Pekerjaan
Rp 205,712.00
1 2
Rp 5,162.40 L.4 Pemasangan 1m2 Balkon
Rp 9,837.00 Pekerja
Rp 1,080.00 Tukang Besi
Rp 3,537.00 Kepala Tukang Besi
Rp 78,600.00 Mandor
Rp 6,300.00 Rangka Besi Hollow
Rp 104,516.40 Pengelasan
Rp 66,920.00
Rp 38,255.00
No Uraian Pekerjaan
Rp 4,200.00
Rp 4,585.00 1 2
Rp 9,900.00 L.5 Pemasangan 1m' Pipa Besi Diameter 2-3"
Rp 12,925.00 Pekerja
Rp 7,857.50 Tukang Besi
Rp 144,642.50 Kepala Tukang Besi
Mandor
Rp 49,712.000 Pipa Besi Diameter 2-3"
Rp 28,418.000 Perlengkapan
Rp 3,120.000
Rp 3,406.000
Rp 120,000.000
No Uraian Pekerjaan
Rp 4,500.000
Rp 1,650.000 1 2
Rp 210,806.00 L.6 Pemasangan 1 m2 Batu Tempel Hitam
Pekerja
Rp 157,740.00 Tukang Batu
Rp 30,057.50 Kepala Tukang Batu
Rp 3,360.00 Mandor
Rp 10,873.00 Batu Tempel Hitam
Rp 422,400.00 Semen Portland
Rp 123,575.00 Pasir Pasang
Rp 172,775.20
Rp 920,780.70
No Uraian Pekerjaan
Rp 28,680.00
Rp 16,395.00 1 2
Rp 1,800.00 L.7 Pemasangan 1 m2 Bekisting untuk Dapur Bersih
Rp 1,965.00 Pekerja
Rp 6,864.00 Tukang Kayu
Rp 5,388.00 Kepala Tukang Kayu
Rp 61,092.00 Mandor
Kayu Meranti Papan
Rp 19,120.00 Paku 8-12 cm
Rp 10,930.00 Minyak Bekisting
Rp 1,200.00
Rp 1,310.00
Rp 3,575.00
No Uraian Pekerjaan
Rp 36,135.00
1 2
Rp 86,040.00 L.8 Pengecoran 1 m3 Dapur Bersih
Rp 49,185.00 Pekerja
Rp 5,400.00 Tukang Batu
Rp 5,895.00 Kepala Tukang Batu
Rp 93,500.00 Mandor
Rp 10,230.00 Semen Portland
Rp 4,041.00 Pasir Beton
Rp 29,100.00 Koral Beton
Rp 148,166.00
No Uraian Pekerjaan
1 2
L.9 Pemasangan 1 m2 Plesteran 1 SP : 4 PP Tebal 15 mm untuk Dapur Bersih
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
Pasir Pasang
No Uraian Pekerjaan
1 2
L.10 Pemasangan 1 m2 Acian Dapur Bersih
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Semen Portland
No Uraian Pekerjaan
1 2
L.11 Pemasangan 1 m2 Keramik Dapur Bersih 20 x 25 Roman Polos Golongan C
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Keramik Dinding 20x25 Roman Polos
Semen Portland
Pasir Pasang
Semen Warna
REKAPITULASI KEBUTUHAN TENAGA KERJA DAN BAHAN PEKERJAAN
- 0.4293 - - Rp 41,041.08 -
- 0.4293 - - Rp 46,922.49 -
- 0.04293 - - Rp 5,151.60 -
- 0.0223236 - - Rp 2,924.39 -
- - 1.88892 - - Rp 47,223.00
- - 6.8688 - - Rp 20,606.40
- - 0.0206064 - - Rp 82,425.60
Jumlah Rp 96,039.56 Rp 150,255.00
Total Rp 246,294.56
- 2.31 - - Rp 220,836.00 -
- 1.155 - - Rp 126,241.50 -
- 0.1155 - - Rp 13,860.00 -
- 0.1155 - - Rp 15,130.50 -
- - 3.465 - - Rp 1,126,125.00
- - 1.98 - - Rp 29,700.00
Jumlah Rp 376,068.00 Rp 1,155,825.00
Total Rp 1,531,893.00
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 0.432 - - Rp 41,299.20 -
- 0.432 - - Rp 47,217.60 -
- 0.0432 - - Rp 5,184.00 -
- 0.0216 - - Rp 2,829.60 -
- - 0.0108 - - Rp 59,400.00
- - 0.18 - - Rp 2,880.00
Jumlah Rp 96,530.40 Rp 62,280.00
Total Rp 158,810.40
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 3.564575 - Rp 340,773.37 -
- 3.564575 - Rp 389,608.05 -
- 0.3564575 - Rp 42,774.90 -
- 0.1853579 - Rp 24,281.88 -
- 49.90405 - - Rp 1,247,601.25
- 3.86114764 - - Rp 888,063.96
Jumlah Rp 797,438.20 Rp 2,135,665.21
Total Rp 2,933,103.41
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 0.40122 - - Rp 38,356.63 -
- 0.6687 - - Rp 73,088.91 -
- 0.06687 - - Rp 8,024.40 -
- 0.20061 - - Rp 26,279.91 -
- - 8.916 - - Rp 583,998.00
- - 2.6005 - - Rp 46,809.00
Jumlah Rp 145,749.85 Rp 630,807.00
Total Rp 776,556.85
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 9.0524 - - Rp 865,409.44 -
- 4.5262 - - Rp 494,713.66 -
- 0.45262 - - Rp 54,314.40 -
- 0.45262 - - Rp 59,293.22 -
- - 14.2252 - - Rp 128,026.80
- - 151.951 - - Rp 167,146.10
- - 0.45262 - - Rp 101,613.19
Jumlah Rp 1,473,730.72 Rp 396,786.09
Total Rp 1,870,516.81
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 1.51476 - - Rp 144,811.06 -
- 0.75738 - - Rp 82,781.63 -
- 0.075738 - - Rp 9,088.56 -
- 0.075738 - - Rp 9,921.68 -
- - 0.11652 - - Rp 349,560.00
- - 0.8739 - - Rp 13,108.50
- - 0.2913 - - Rp 4,806.45
Jumlah Rp 246,602.93 Rp 367,474.95
Total Rp 614,077.88
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
2.581524 Rp 246,793.69 -
0.430254 Rp 47,026.76 -
0.04380768 Rp 5,256.92 -
0.12985848 Rp 17,011.46 -
600.79104 - Rp 660,870.14
0.773362008 - Rp 193,340.50
1.204085376 - Rp 270,317.17
Jumlah Rp 316,088.84 Rp 1,124,527.81
Total Rp 1,440,616.65
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 0.8739 - - Rp 83,544.84 -
- 0.43695 - - Rp 47,758.64 -
- 0.043695 - - Rp 5,243.40 -
- 0.043695 - - Rp 5,724.05 -
- - 18.17712 - - Rp 19,994.83
- - 0.069912 - - Rp 15,695.24
Jumlah Rp 142,270.92 Rp 35,690.08
Total Rp 177,961.00
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 0.5826 - - Rp 55,696.56 -
- 0.2913 - - Rp 31,839.09 -
- 0.02913 - - Rp 3,495.60 -
- 0.02913 - - Rp 3,816.03 -
- - 9.46725 - - Rp 10,413.98
Jumlah Rp 94,847.28 Rp 10,413.98
Total Rp 105,261.26
(Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Alat Upah Bahan Alat Upah Bahan
8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9) 13 = (7 x 10)
- 4.80645 - - Rp 459,496.62 -
- 2.403225 - - Rp 262,672.49 -
- 0.2403225 - - Rp 28,838.70 -
- 0.2403225 - - Rp 31,482.25 -
- - 106.81 - - Rp 499,336.75
- - 49.66665 - - Rp 54,633.32
- - 0.096129 - - Rp 21,580.96
- - 10.36057 - - Rp 155,408.55
Jumlah Rp 782,490.06 Rp 730,959.58
Total Rp 1,513,449.64
RAILING TANGGA
erial (Rp)
Alat Dimensi (m)
Tipe Gambar
14 = (8 x 11) a b
-
A 0.08 0.08
-
-
-
- Lebar (m)
B Gambar Terlampir
- 0.12
-
-
246,294.56
C 0.076
-
-
-
-
-
-
-
1,531,893.00 D 0.12
erial (Rp)
Alat
14 = (8 x 11)
-
-
-
- E 0.076
-
-
-
158,810.40
VOLUME RAILING TOTAL (M3
erial (Rp)
Alat
14 = (8 x 11) DIMENSI
Panjang (m)
-
-
-
-
- 2.2
-
-
2,933,103.41
erial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
776,556.85
erial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
-
1,870,516.81
erial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
-
614,077.88
erial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
-
1,440,616.65
erial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
177,961.00
erial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
105,261.26
erial (Rp)
Alat
14 = (8 x 11)
-
-
-
-
-
-
-
-
-
1,513,449.64
VOL
Dimensi (m)
Panjang (m) Luas (m2) Volume (m3)
c d e f
DIMENSI
Lebar (m) Luas (m2)
1.5 3.3
VOLUME PEKERJAAN LAIN-LAIN
VOLUME ACIAN
No
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
RENCANA AN
Bahan Satuan
2 3
Besi Strip Tebal 3mm Kg
Baut M12 Kg
Kayu Balok Rasmala m3
Grace Wood (Costul Dev Uk. 12x102x900 mm) m2
Lem Kayu Kg
Kayu Papan Borneo Super m3
Paku 5 cm - 7 cm Kg
Rangka Besi Hollow m'
Pengelasan m3
Pipa Besi Diameter 2-3" m'
Perlengkapan %
Batu Tempel Hitam buah
Semen Portland Kg
Pasir Pasang m3
Kayu Meranti Papan m3
Paku 8-12 cm Kg
Minyak Bekisting Liter
Pasir Beton m3
Koral Beton m3
Keramik Dinding 20x25 Roman Polos buah
Semen Warna Kg
TOTAL
RENCANA ANGGARAN BIAYA PEKERJAAN LAIN-LAIN
- Rp 5,736.00 - - Rp 5,736.00
No
- Rp 6,558.00 - - Rp 6,558.00
- Rp 1,440.00 - - Rp 1,440.00 1
- Rp 393.00 - - Rp 393.00 M.2
- - Rp 16,500.00 - Rp 16,500.00
- - Rp 1,750.00 - Rp 1,750.00
- - Rp 2,500.00 - Rp 2,500.00
Rp 14,127.00 Rp 20,750.00 - Rp 34,877.00
- Rp 1,912.00 - - Rp 1,912.00
- Rp 6,885.90 - - Rp 6,885.90
- Rp 756.00 - - Rp 756.00
- Rp 393.00 - - Rp 393.00
- - Rp 1,500.00 - Rp 1,500.00
No
- - Rp 2,400.00 - Rp 2,400.00
- - Rp 5,980.00 - Rp 5,980.00 1
Rp 9,946.90 Rp 9,880.00 - Rp 19,826.90 M.3
- Rp 1,912.00 - - Rp 1,912.00
- Rp 6,885.90 - - Rp 6,885.90
- Rp 756.00 - - Rp 756.00
- Rp 393.00 - - Rp 393.00
- - Rp 1,500.00 - Rp 1,500.00
- - Rp 2,400.00 - Rp 2,400.00
- - Rp 10,946.00 - Rp 10,946.00
Rp 9,946.90 Rp 14,846.00 - Rp 24,792.90
No
1
M.4
REKAPITULASI KEBUTUHAN TENAGA KERJA DAN B
- - 5.403944 - - Rp 516,617.05
- - 0.6947928 - - Rp 75,940.85
- - 0.4631952 - - Rp 55,583.42
- - 0.2315976 - - Rp 30,339.29
Rp 33,000.00 - - 15.43984 - -
Rp 21,578.00 - - 11.57988 - -
Rp 31,500.00 - - 13.123864 - -
Rp 55,000.00 - - 20.071792 - -
Rp 17,500.00 - - 0.771992 - -
Rp 25,000.00 - - 2.315976 - -
Rp 4,000.00 - - 15.43984 - -
Jumlah Rp 678,480.61
Total Rp 3,088,38
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat Upah
7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)
- - 2.506218 - - Rp 239,594.44
- - 2.506218 - - Rp 273,929.63
- - 0.5012436 - - Rp 60,149.23
- - 0.1253109 - - Rp 16,415.73
Rp 55,000.00 - - 12.53109 - -
Rp 17,500.00 - - 4.17703 - -
Rp 25,000.00 - - 4.17703 - -
Jumlah Rp 590,089.03
Total Rp 1,456,82
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat Upah
7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)
- - 10.69814 - - Rp 1,022,742.18
- - 33.699141 - - Rp 3,683,316.11
- - 3.3699141 - - Rp 404,389.69
- - 1.604721 - - Rp 210,218.45
Rp 15,000.00 - - 53.4907 - -
Rp 24,000.00 - - 53.4907 - -
Rp 23,000.00 - - 139.07582 - -
Jumlah Rp 5,320,666.44
Total Rp 10,605,54
Harga Satuan (Rp) Jumlah yang Dibutuhkan Harga Material (Rp)
Bahan Alat Upah Bahan Alat Upah
7 8 9 = (3 x 4) 10 = (3 x 4) 11 = (3 x 4) 12 = (6 x 9)
- - 12.30106 - - Rp 1,175,981.34
- - 38.748339 - - Rp 4,235,193.45
- - 3.8748339 - - Rp 464,980.07
- - 1.845159 - - Rp 241,715.83
Rp 15,000.00 - - 61.5053 - -
Rp 24,000.00 - - 61.5053 - -
Rp 42,100.00 - - 159.91378 - -
Jumlah Rp 6,117,870.69
Total Rp 15,248,94
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
Daun Pintu/Jendela (m)
Type Jumlah Type
Panjang
- - 0.8
P1 4
- - 0.8
- -
P2 3 0.7
- -
Rp 509,514.72 -
P2* 1 0.7
Rp 249,870.65 -
Rp 413,401.72 -
P4 1 0.8
Rp 1,103,948.56 -
Rp 13,509.86 -
PJ3 1 0.8
Rp 57,899.40 -
Rp 61,759.36 -
PJ4 1 0.8
Rp 2,409,904.27 -
3,088,384.88
Harga Material (Rp)
Bahan Alat
13 = (7 x 10) 14 = (8 x 11)
- -
- -
- -
Tipe Gambar
- -
Rp 689,209.95 -
Rp 73,098.03 -
Rp 104,425.75 -
A
Rp 866,733.73 -
1,456,822.75
Harga Material (Rp)
Bahan Alat
B Gambar Terlampir
13 = (7 x 10) 14 = (8 x 11)
- -
- -
- - C
- -
Rp 802,360.50 -
C
Rp 1,283,776.80 -
Rp 3,198,743.86 -
Rp 5,284,881.16 -
10,605,547.60
Harga Material (Rp)
Bahan Alat D
13 = (7 x 10) 14 = (8 x 11)
- -
- -
- -
- -
Rp 922,579.50 -
Rp 1,476,127.20 - E
Rp 6,732,370.14 -
Rp 9,131,076.84 -
15,248,947.52
TOTA
LANTAI 1
1 1.90 Garasi
2 3.00 Teras
3 3.00 Tangga 1
4 2.70 Kamar Mandi/WC
5 3.00 Foyer
6 3.00 Ruang Tamu
7 3.00 Ruang Keluarga
8 3.00 Ruang Makan
9 3.00 Dapur
10 3.00 Ruangan Tambahan
11 3.00 Ruang Tidur Utama
12 3.00 Kamar Mandi Utama
TOTAL VOLUME PLAFOND GYPSU
Dinding Ekterior
Depan Belakang
F1-G1 E10-G10
D1-F1 E7-E10
1'D-3D B7-E7
Lantai 1 3C-3D 7B-10B
1'C-3C A10-B10
A2-C2
2.1 2 - - - - -
2.1 4 - - - - -
JUMLAH (M2)
TOTAL (M2)
Dimensi (m)
Panjang (m)
a b c d e f
Bidang Besi
Bidang Plafond
LANTAI 1
Luas (m2)
Vol. Pengecatan Dinding Interior (m2)
Depan Belakang
8.316 13.6 Luas Acian Seluruh Dinding - Luas Acian Dinding E
12.852 34.3 1149.96-615.053
9.45 25.893 534.907
11.34 34.3
9.45 10.8
20.412
20.547 15.22
7.61 17.503
11.415 20.547
1.9025
13.698
8.371
135.3635 172.163
307.5265
615.053
ERJAAN PENGECATAN
Daun Pintu)
- - - - - 3.36 -
- - - - - 6.72 -
41.2 8.125
50.85
Tangga)
Luas (m2)
Luas 1 Luas 2 Luas 3 Luas 4
7.92
0.756
0.756
16.128
0.756
26.35
Volume (m2)
3.44
Volume (m2)
24.072
LANTAI 2
Elevasi (m) Nama Ruangan As Verikal Panjang (m) As Horizontal Lebar (m) Luas (m2)
6.78 Tangga 2 1F-6F 6 F1-G1 2.2 13.2000
6.78 Ruang Tidur 1 5E-7E 4 E5-G5 4 16.0000
6.78 Ruang Tidur 2 5C-7C 4 C5-E5 4.6 18.4000
6.78 Ruang Tidur 3 4A-7A 5.8 A4-C4 5.4 31.3200
6.34 Toilet 1 3A-4A 3.7 A3-C3 2.93 10.8410
3C-3'C 1.183 B3-C3 2.315 2.7386
6.34 Toilet 2
3'C-3'D 1.107 B3-C'3 1.65 1.8266
6.78 Hall 1E-5E 6 E1-F1 1.8 10.8000
1E-5E 6 D1-E1 1.6 9.6000
6.78 Ruang Keluarga 2C-5C 5.5 C2-D2 3 16.5000
3'C-3'D 1.107 C'3-C3 0.6 0.6642
TOTAL VOLUME PLAFOND GYPSUM LT 2 131.8904
& Eksterior
TOTAL HARGA
(UPAH+BAHAN)
9 = (7+8)
Rp 3,088,384.88
Rp 1,456,822.75
Rp 10,605,547.60
Rp 15,248,947.52
Rp 30,399,702.75
REKAPITULASI TENAGA KERJA
No
1
1
2
3
4
5
6
7
8
9
10
11
121
3
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
46
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
84
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
TOTAL
REKAPITULASI BAHAN
Bahan Satuan
2 3
Dolken Kayu φ 8 - 10 / 400 cm Batang
Kayu Meranti Kaso 5/7 m3
Kayu Meranti Papan 3/20 m3
Kayu Meranti Balok 6/12 m3
Polywood, t=4mm Lbr
Pasir pasang m3
Pasir Beton m3
Semen Portland Kg
Batu Koral Beton Kali m3
Cat Meni Besi Liter
Cat SEIV Gloss Warna Standar Liter
Paku 2" - 3" Kg
Kunci Tanam Bh
Jendela nako + accessories Set
Paku 2" - 5" Kg
Batu bata merah bakar kualitas I bh
Besi Strip bh
Kaca Polos tebal 3 mm m2
Seng Gelombang BJLS 25, Uk 90 x 180 cm Lbr
Batu Belah Pondasi m3
Koral Beton m3
Besi Beton Polos kg
Kawat Beton kg
Paku 8-12 cm kg
Minyak Bekisting Ltr
PC (50Kg) zak
Split Pecah Mesin 2/3 m3
Besi Beton Ulir kg
Pasir Beton Kg
Kerikil Kg
Air Liter
Kayu Kelas III (Papan Albasia) m3
Paku 5-10 cm Kg
Balok Kayu Kelas II (Balok Albasia) m3
Triplek 9 mm 120 x 240 Lembar
Keramik Dinding 20x25 Roman Polos Buah
Semen Warna Kg
Balok Kayu Kamper Samarinda m3
Paku 10 cm Kg
Lem Kayu Kg
Profil Alumunium m
Skrup Fixer Buah
Sealant Tube
Kayu Papan Samarinda m3
Paku 1" - 2,5" Kg
Teakwood, t = 4mm , 90 x 220 mm Lbr
Plat Seng Alumumium Lbr
Daun Pintu Alumunium PJ2 Buah
Daun Pintu Alumunium P3 Buah
Engsel Pintu + Baut Set
Kunci Pintu Set
Handle Tarik (BLC AAH8 SS) Pasang
Handle Tarik Buah
Daun Jendela Alumunium Set
Engsel Jendela Set
Slot Jendela Pasang
Accessories ls
Pintu Besi + Accessories m2
Glass Block Buah
Kaca Polos Tebal 5mm Asahi m2
Engsel Pintu (Stainless Eks.Otis 4"x3") Buah
Engsel Jendela (Stainless Eks.Otis 3" x 2,5") Buah
Kunci Tanam (Eks. Ses Art 2030 40mm SS) Buah
Kunci Tanam Buah
Pegangan Pintu (BLC AAH 8 SS) Buah
Kait Angin Buah
Pintu Besi Henderson m2
Pasir Urug m3
Koral Beton m3
Tanah Urug m3
Grace Wood (Costul Dev Uk. 12 x 102 x 900 mm) m2
Keramik Ukuran 50x50 Roman Polos (Golongan A) Dus (isi 4)
Keramik Ukuran 33,3 x 33,3 Roman Polos (Golongan A) Dus (Isi 9)
Keramik Ukuran 30 x 30 Roman Polos (Golongan B) Dus (11)
Keramik Ukuran 20 x 20 Roman Polos (Golongan A) Dus (25)
Keramik Ukuran 10 x 33 Roman Polos Untuk Border Buah
Kayu Papan Borneo Super m3
Paku 5 cm - 7 cm Kg
Paving Block Berwarna Tebal 6 cm (Ubin Set 21x21x6) m2
Paving Block Berwarna Tebal 6 cm (Uk. Bata 10,5x21x6) m2
Balok Kayu Borneo Kelas II m3
Besi Strip Tebal 5 mm Kg
Paku 12 cm Kg
Kaso-Kaso (5x7) cm m3
Reng (3x4) cm m3
Papan Kayu Borneo Super m3
Genting Kanmuri Milenio Buah
Gypsum Board Tebal 9 mm Lembar
Paku Sekrup Kg
Tripleks (120 x 240) Tebal 6 mm Lembar
Paku Tripleks Kg
List Gypsum m
Lem Kayu Kg
Kayu Balok Borneo 5/7 m3
List Kayu Profil m
Pipa Listrik 5/8" Batang
Kabel Prima NYM 3x2,5 m'
T dus Buah
L Bow Buah
Klem Buah
MCB Domae 1 Phase 25A Buah
Saklar Tunggal Broco Buah
Saklar Ganda Broco Buah
Saklar Hotel Pieno E8231L2F Buah
Stop Kontak Broco Buah
Stop Kontak AC Panasonic Buah
Stop Kontak Waterproof Panasonic Buah
Stop Kontak Antena TV Broco Buah
Stop Kontak Telepon Broco Buah
Kotak Pembagi (Distributor Point) Buah
Las Doof Buah
Lampu Downlight Panasonic 4 Inch Buah
Fitting Buah
Lampu LED TL Phillips Buah
Kap Lampu Buah
Lampu Taman + Tiang Buah
Closet Duduk Warna Toto Buah
PerlengkapanCloset Duduk (6% dari bahan) Set
Closet Jongkok Putih INA Buah
Wastafel Toto L 521V1A Buah
Perlengkapan Watafel (12% dari bahan) Set
Bathtube Buah
Perlengkapan Bath tube (20% dari bahan) Set
Bak Mandi Fiberglass Buah
Perlengkapan Bak Mandi (12% dari bahan) Set
Bak Cuci Piring Buah
Waterdrain Buah
Floor Drain Buah
Jet Washer Closet Buah
Tandon Air 1000L Buah
Perlengkapan Tandon Air (12% dari Bahan) Set
Kran Air Buah
Seal Tape Buah
Jet Shower Buah
Perlengkapan Jet Shower Set
Pipa PVC 1" Rucika m
Perlengkapan Pipa PVC 1"(35% dari bahan) set
Pipa PVC 1/2" Rucika m
Perlengkapan Pipa PVC 1/2" (35% dari bahan) set
Pipa PVC 3/4 " Rucika m
Perlengkapan Pipa PVC 3/4" (35% dari bahan) Set
Pipa PVC 1 1/4" Rucika m
Perlengkapan Pipa PVC 1 1/4" (35% dari bahan) set
Pipa PVC 2" Rucika m
Perlengkapan Pipa PVC 2" (35% dari bahan) set
Pipa PVC 3" Rucika m
Perlengkapan Pipa PVC 3" (35% dari bahan) set
Pipa PVC 4" Rucika m
Perlengkapan Pipa PVC 4" (35% dari bahan) set
Kerikil m3
Baja Tulangan Kg
Pipa PVC 4" m
Batu Split Pecah Mesin 1/2 m3
Galian Tanah m3
Pipa GIP 1.5 m3
Galian Tanah untuk Rembesan m3
Pas. Ijuk m2
Urugan Kembali/Perataan Tanah m3
Plat Penutup Beton m3
Besi Strip Tebal 3mm Kg
Baut M12 Kg
Kayu Balok Rasmala m3
Kayu Papan Borneo Super m3
Rangka Besi Hollow m'
Pengelasan m3
Pipa Besi Diameter 2-3" m'
Perlengkapan %
Batu Tempel Hitam buah
Koral Beton m3
Cat Menie Kayu A Kg
Plamuur Kayu Kg
Cat Dasar Kayu Kg
Cat Penutup Kayu (Avian) Kg
Kuas Buah
Pengencer Cat (Tinner) Ltr
Ampelas Lbr
Planmuur Kg
Cat Dasar Dulux Kg
Cat Besi Avian Kg
Cat Dinding Interior Vinilex Kg
Cat Dinding Eksterior Vinilex Kg
TOTAL
I BAHAN
m2 Rp 16,110.00 - Rp 6,766,200.00 -
m' Rp 67,860.00 Rp 287,291.25 Rp 1,900,080.00 Rp 8,044,155.00
m2 Rp 561,650.00 Rp 911,785.50 Rp 6,880,212.50 Rp 11,169,372.38
m2 Rp 344,750.00 Rp 652,567.50 Rp 4,137,000.00 Rp 7,830,810.00
m2 Rp 9,560.00 Rp 697,000.00 Rp 6,883.20 Rp 501,840.00
m' Rp 22,345.00 Rp 49,100.00 Rp 3,882,220.30 Rp 8,530,634.00
Rp 1,022,275.00 Rp 2,597,744.25 Rp 23,572,596.00 Rp 36,076,811.38
m3 Rp 74,975.00 - Rp 11,220,413.43 -
m3 Rp 54,350.00 - Rp 2,583,301.65 -
Rp 129,325.00 Rp - Rp 13,803,715.08 Rp -
Rp 6,766,200.00
Rp 9,944,235.00
Rp 18,049,584.88
Rp 11,967,810.00
Rp 508,723.20
Rp 12,412,854.30
Rp 59,649,407.38
Rp 11,220,413.43
Rp 2,583,301.65
Rp 13,803,715.08
Rp 55,059,892.80
Rp 16,228,922.44
Rp 3,942,782.02
Rp 3,541,540.80
Rp 1,617,208.32
Rp 184,844.38
Rp 2,759,112.62
Rp 4,061,853.29
Rp 716,740.40
Rp 10,790,177.44
Rp 12,299,457.00
Rp 111,202,531.50
Rp 3,239,391.90
Rp 1,667,979.21
Rp 7,018,634.29
Rp 7,825,980.41
Rp 10,291,389.93
Rp 6,392,161.00
Rp 26,553,788.41
Rp 80,017,815.97
Rp 8,081,865.12
Rp 4,458,896.60
Rp 15,003,450.77
Rp 46,301,882.31
Rp 19,166,892.50
Rp 18,738,806.76
Rp 74,325,928.18
Rp 4,128,423.07
Rp 10,732,368.23
Rp 11,989,533.66
Rp 4,717,353.29
Rp 7,009,510.84
Rp 15,022,649.17
Rp 2,905,965.50
Rp 4,476,072.52
Rp 5,488,344.48
Rp 395,555,084.13
Rp 128,739,067.51
Rp 67,327,049.52
Rp 28,794,596.64
Rp 3,093,209.56
Rp 25,937,191.24
Rp 41,553,804.60
Rp 295,444,919.07
Rp 5,120,809.65
Rp 23,665,564.34
Rp 15,020,376.74
Rp 1,678,318.00
Rp 4,433,318.00
Rp 16,431,542.00
Rp 1,906,064.44
Rp 79,467.60
Rp 3,815,120.90
Rp 2,939,222.40
Rp 1,970,416.80
Rp 7,895,569.00
Rp 356,222.00
Rp 3,721,522.00
Rp 822,186.00
Rp 24,325,550.38
Rp 114,181,270.24
Rp 362,036.30
Rp 1,151,136.50
Rp 2,656,975.01
Rp 45,362,601.20
Rp 33,408,446.22
Rp 8,777,621.91
Rp 7,100,460.72
Rp 7,991,654.60
Rp 2,484,598.09
Rp 5,287,062.90
Rp 4,446,471.81
Rp 722,263.96
Rp 119,751,329.23
Rp 12,434,395.40
Rp 15,333,444.01
Rp 42,209,715.76
Rp 5,497,355.03
Rp 26,770,772.65
Rp 102,245,682.84
Rp 13,256,764.11
Rp 2,251,122.72
Rp 5,428,218.86
Rp 38,386,015.88
Rp 990,928.81
Rp 60,313,050.39
Rp 284,040.00
Rp 2,586,540.00
Rp 3,089,320.00
Rp 492,080.00
Rp 6,348,780.00
Rp 1,784,580.00
Rp 1,048,560.00
Rp 1,032,560.00
Rp 765,420.00
Rp 579,280.00
Rp 7,665,840.00
Rp 642,680.00
Rp 500,830.00
Rp 26,820,510.00
Rp 10,671,880.00
Rp 458,605.00
Rp 14,970,200.00
Rp 6,197,076.00
Rp 1,462,550.00
Rp 336,623.00
Rp 1,468,705.00
Rp 430,964.00
Rp 2,348,550.00
Rp 956,205.00
Rp 721,210.20
Rp 1,146,922.34
Rp 902,275.80
Rp 1,576,635.02
Rp 1,056,620.04
Rp 1,995,594.91
Rp 5,647,011.81
Rp 10,510,919.28
Rp 3,137,156.00
Rp 4,397,693.90
Rp 70,393,397.29
Rp 246,294.56
Rp 1,531,893.00
Rp 158,810.40
Rp 2,933,103.41
Rp 776,556.85
Rp 1,870,516.81
Rp 614,077.88
Rp 1,440,616.65
Rp 177,961.00
Rp 105,261.26
Rp 1,513,449.64
Rp 11,368,541.45
Rp 3,088,384.88
Rp 1,456,822.75
Rp 10,605,547.60
Rp 15,248,947.52
Rp 30,399,702.75
Rp 1,411,129,141.35
Jumlah Harga
No Jenis Pekerjaan
Upah Bahan
1 Pekerjaan Persiapan Rp 23,572,596.00 Rp 36,076,811.38
2 Pekerjaan Tanah Rp 13,803,715.08 -
3 Pekerjaan Pondasi Rp 27,525,539.57 Rp 83,676,991.94
4 Pekerjaan Struktur Rp 106,398,065.55 Rp 289,157,018.57
5 Pekerjaan Dinding Rp 164,036,316.29 Rp 131,408,602.78
6 Pekerjaan Pintu dan Jendela Rp 21,450,541.64 Rp 92,730,728.60
7 Pekerjaan Lantai Rp 43,962,151.87 Rp 75,789,177.37
8 Pekerjaan Atap Rp 19,817,838.00 Rp 82,427,844.85
9 Pekerjaan Plafond Rp 23,388,396.61 Rp 36,924,653.78
10 Pekerjaan Elektrikal Rp 3,784,560.00 Rp 23,035,950.00
11 Pekerjaan Sanitasi Rp 13,088,909.04 Rp 57,304,488.26
12 Pekerjaan Lain-Lain Rp 4,567,856.76 Rp 6,800,684.69
13 Pekerjaan Pengecatan Rp 12,707,106.76 Rp 17,692,595.99
JUMLAH Rp 478,103,593.17 Rp 933,025,548.18
mlah Harga Persentase
Alat Bahan + Upah + Alat Upah Bahan Alat Upah+Bahan+Alat
- Rp 59,649,407.38 39.52% 60.48% - 100.00%
- Rp 13,803,715.08 100.00% - - 100.00%
- Rp 111,202,531.50 24.75% 75.25% - 100.00%
- Rp 395,555,084.13 26.90% 73.10% - 100.00%
- Rp 295,444,919.07 55.52% 44.48% - 100.00%
- Rp 114,181,270.24 18.79% 81.21% - 100.00%
- Rp 119,751,329.23 36.71% 63.29% - 100.00%
- Rp 102,245,682.84 19.38% 80.62% - 100.00%
- Rp 60,313,050.39 38.78% 61.22% - 100.00%
- Rp 26,820,510.00 14.11% 85.89% - 100.00%
- Rp 70,393,397.29 18.59% 81.41% - 100.00%
- Rp 11,368,541.45 40.18% 59.82% - 100.00%
- Rp 30,399,702.75 41.80% 58.20% - 100.00%
- Rp 1,411,129,141.35 33.88% 66.12% - 100.00%
No Jenis Pekerjaan
1 Pekerjaan Persiapan
2 Pekerjaan Tanah
3 Pekerjaan Pondasi
4 Pekerjaan Struktur
5 Pekerjaan Dinding
6 Pekerjaan Pintu dan Jendela
7 Pekerjaan Lantai
8 Pekerjaan Atap
9 Pekerjaan Plafond
10 Pekerjaan Elektrikal
11 Pekerjaan Sanitasi
12 Pekerjaan Lain-Lain
13 Pekerjaan Pengecatan
Harga Total
Keuntungan 10%
Harga Total + Keuntungan 10%
PPN 10%
Harga Penawaran
Harga Bid Price (Pembulatan)
Terbilang Satu Milyar Tujuh Ratus Tujuh Juta Empar Ratus Tujuh Pu
Biaya Pekerjaan
Rp 59,649,407.38
Rp 13,803,715.08
Rp 111,202,531.50 Harga Per m2
Rp 395,555,084.13 Luas Lantai 1 = 200.173
Rp 295,444,919.07 Luas Lantai 2 = 159.12
Rp 114,181,270.24 Luas Total = 359.293
Rp 119,751,329.23 Harga Per m2 = Rp 4,752,305.22
Rp 102,245,682.84
Rp 60,313,050.39
Rp 26,820,510.00
Rp 70,393,397.29
Rp 11,368,541.45
Rp 30,399,702.75
Rp 1,411,129,141.35
Rp 141,112,914.13
Rp 1,552,242,055.48
Rp 155,224,205.55
Rp 1,707,466,261.03
Rp 1,707,470,000.00
tus Tujuh Juta Empar Ratus Tujuh Puluh Ribu Rupiah
m2
m2
m2
m2
Rp 4,752,305.22
TABEL REKAPITULASI VOLUME
No
1
A. PEKERJAAN PERSIAPAN
A.1
A.2
A.3
A.4
A.5
A.6
B. PEKERJAAN TANAH
B.1
B.2
C. PEKERJAAN PONDASI
C.1 Pondasi Batu Kali
C.1.1
C.1.2
C.1.3
C.1.4
C.2 Pondasi Rollag Bata
C.2.1
C.3 Pondasi Strauss Pile (Kedalaman 6 meter)
C.3.1 Pemasangan Pile Cap
C.3.1.1
C.3.1.2
C.3.1.3
C.3.1.4
C.3.2 Pemasangan Strauss Pile (Kedalaman 6m)
C.3.2.1
C.3.2.2
D. PEKERJAAN STRUKTUR
D.1 Pekerjaan Tie Beam
D.1.1
D.1.2
D.1.3
D.1.4
D.2 Pekerjaan Kolom
D.2.1
D.2.2
D.2.3
D.2.4
D.3 Pekerjaan Balok
D.3.1
D.3.2
D.3.3
D.3.4
D.4 Pekerjaan Pelat Lantai
D.4.1
D.4.2
D.3.4
D.5 Pekerjaan Ring Balok
D.5.1
D.5.2
D.5.3
D.6 Pekerjaan Pelat Atap
D.6.1
D.6.2
D.6.3
D.7 Pekerjaan Tangga
D.7.1
D.7.2
D.7.3
E. PEKERJAAN DINDING
E.1
E.2
E.3
E.4
E.5
E.6
F. PEKERJAAN PINTU DAN JENDELA
F.1
F.2
F.3
F.4
F.5
F.6
F.7
F.8
F.9
F.10
F.11
F.12
F.13
F.14
F.15
F.16
G. PEKERJAAN LANTAI
G.1
G.2
G.3
G.4
G.5
G.6
G.7
G.8
G.9
G.10
G.11
G.12
H. PEKERJAAN ATAP
H.1
H.2
H.3
H.4
H.5
I. PEKERJAAN PLAFOND
I.1
I.2
I.3
1.4
1.5
J. PEKERJAAN ELEKTRIKAL
J.1
J.2
J.3
J.4
J.5
J.6
J.7
J.8
J.9
J.10
J.11
J.12
J.13
K. PEKERJAAN SANITASI
K.1
K.2
K.3
K.4
K.5
K.6
K.7
K.8
K.9
K.10
K.11
K.12
K.13
K.14
K.15
K.16
K.17
K.18
K.19
K.20
L. PEKERJAAN LAIN-LAIN
L.1
L.2
L.3
L.4
L.5
L.6
L.7
L.8
L.9
L.10
L.11
M. PEKERJAAN PENGECATAN
M.1
M.2
M.3
M.4
TABEL REKAPITULASI VOLUME
m2
m'
m2
m2
m2
m'
m3
m3
m3
m3
Kg
m2
m2
m3
m3
Kg
m2
m3
Kg
m3
Kg
Kg
m2
m3
Kg
Kg
m2
m3
Kg
Kg
m2
m3
Kg
m2
m3
Kg
m2
m3
Kg
m2
m3
Kg
m2
m2
m2
m2
m2
m2
m2
m3
m
m2
Buah
Buah
Buah
m2
Buah
m2
Buah
Buah
Buah
Buah
Buah
Buah
m2
m3
m3
m3
m2
m2
m2
m2
m2
m2
m'
m2
m2
m3
m3
m2
m'
m2
m2
m2
m'
m2
m'
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
m
m
m
m
m
m
m
Buah
Buah
m3
m2
m2
m2
m'
m2
m2
m3
m2
m2
m2
m2
m2
m2
m2
Pekerjaan Struktur
Pondasi = Batu Kali, Rollag Bata, Strauss Pile
Mutu Beton = Mutu Beton K-225 / f'c = 19,3 Mpa
Besi Polos Ukuran 8, 10, 12
Uk. Tulangan =
Besi Ulir Ukuran 13
Pelat Lantai 12 cm
Tebal Pelat =
Pelat Atap 10 cm
Pekerjaan Arsitektural
Dinding = Pas. Bata Merah, Plester dan Finishing Cat
Kusen Pintu Kayu Kamper Samarinda, Alum
Daun Pintu Teakwood, Alumunium, Besi
Pintu & Jendela =
Kusen dan Daun Jendela Berbahan Alumuniu
Pintu garasi besi henderson
Keramik Lantai Roman Ukuran 50x50, 33,33
Lantai Kayu Gracewood
Lantai =
Plint Lantai Kayu Tebal 2 cm Lebar 10 cm
Lantai carport berupa paving block ubin set d
Konstruksi Kuda-Kuda Kayu dan Gording m
Atap =
Rangka atap menggunakan kayu dengan baha
Plafond menggunakan gypsum Tebal 9 mm d
Plafond = Rangka plafond menggunakan kayu borneo
List plafond menggunakan gypsum
Keterangan Lain
Sanitasi = Bath Tube, Closet duduk, Closet Jongkok, W
Jumlah Kamar Mandi = 5
Jumlah Kamar Tidur = 5
Pekerjaan Struktur
tu Kali, Rollag Bata, Strauss Pile
utu Beton K-225 / f'c = 19,3 Mpa
si Polos Ukuran 8, 10, 12
si Ulir Ukuran 13
at Lantai 12 cm
at Atap 10 cm
Pekerjaan Arsitektural
s. Bata Merah, Plester dan Finishing Cat
sen Pintu Kayu Kamper Samarinda, Alumunium YKK, Besi
un Pintu Teakwood, Alumunium, Besi
sen dan Daun Jendela Berbahan Alumunium
tu garasi besi henderson
ramik Lantai Roman Ukuran 50x50, 33,33 x 33,33 , 20x20, 30x30, 10x30
ntai Kayu Gracewood
nt Lantai Kayu Tebal 2 cm Lebar 10 cm
ntai carport berupa paving block ubin set dan uk. Bata tebal 6 cm
nstruksi Kuda-Kuda Kayu dan Gording menggunakan Kayu Borneo Kelas II
ngka atap menggunakan kayu dengan bahan penutup atap genteng kanmuri
fond menggunakan gypsum Tebal 9 mm dan Tripleks tebal 6 mm
ngka plafond menggunakan kayu borneo
t plafond menggunakan gypsum
Keterangan Lain
th Tube, Closet duduk, Closet Jongkok, Wastafel, dan Kitchen Sink