DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PEMBANGUNAN APARTEMEN RAKYAT RANCACILI CROSS 1 TAHAP 3


LOKASI : KOTA BANDUNG
TAHUN ANGGARAN : 2023

HARGA SATUAN
NO. URAIAN SATUAN
(RP)

A BAHAN AGREGAT, BAHAN PEREKAT, dan BAHAN JADINYA


1 Tanah Urug m3 35,000.00
2 Pasir Urug m3 120,000.00
3 Pasir Pasang m3 180,000.00
4 Pasir Beton m3 210,000.00
5 Batu Belah m3 210,000.00
6 Split 2-3 m3 220,000.00
7 Portland Cement (1 zak = 50 kg) kg 1,100.00
8 Portland Cement (1 zak = 50 kg) zak 55,000.00
9 Semen Warna kg 4,500.00
10 Bata Merah Bakar Kelas 1 bh 850.00
11 Bata Ringan 600x200x100 bh 8,192.77
12 Semen Instan Perekat Pasangan Bata, @40kg zak 68,468.47
13 Semen Instan Pelester, @50kg zak 55,225.23
14 Semen Instan Acian, @40kg zak 68,918.92
15 Ready Mix K-300 m3 1,040,000.00
16 Sewa Pompa Beton/m 3
m3 54,000.00
17 Vibrator sewa-hari 150,000.00
18 Air Liter 50.00
19 Lem Putih kg 25,000.00
20 Lem Kayu kg 60,000.00
21 Lem Kuning kg 60,000.00
22 Batu Andesit 30x60 m2 154,000.00
23 Saluran U-Ditch 30 x 40 x 120 unit 363,495.00
24 Rooster 20x20 bh 10,000.00
25 Batu Tempel 20x40 m2 110,000.00
26 Kansteen Uk. 60 x 14 x 30 cm m' 85,000.00
27 Grass Block 40x30x6 cm m2 120,000.00
28 Gravel Beton Ø30 cm, l = 1,00 m m1 86,000.00
29 Semen Grouting kg 4,800.00
30 Paving Block Fullpave 20x20 8mm m2 87,000.00
31 Conplast WP 421 Fosroc Waterproofing integral ltr 28,000.00
32 Sirtu Makadam / Beskos m3 140,000.00

B BAHAN KAYU dan BAHAN JADINYA


1 Kayu Papan Terentang m3 850,000.00
2 Kayu Balok Terentang m3 1,500,000.00
3 Dolken dia 8 s/d 10 cm btg 18,000.00
4 Kayu Kelas Kuat III m3 850,000.00
5 Balok Kayu Kelas Kuat II m3 1,500,000.00
6 Multipleks 6 mm, uk. 1,20 x 2,40 lbr 77,000.00
7 Multipleks 9 mm, uk. 1,20 x 2,40 lbr 126,500.00
8 Multipleks 12 mm, uk. 1,20 x 2,40 lbr 154,000.00
9 Multipleks 18 mm, uk. 1,20 x 2,40 lbr 225,500.00
10 Teakwood, 9 mm, 1,20x2,40 lbr 126,500.00
11 List Profil Kayu Finishing Melamic Lebar 10 cm m1 57,000.00
12 Floordeck/Metal Sheet, t = 0,75 mm lebar 1,00 m panjang 6 meter m2 153,450.00
13 Ijuk kg 20,000.00
14 Kayu Papan 2x20 cm m3 825,000.00
15 Triplek 4 mm lbr 62,700.00
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PEMBANGUNAN APARTEMEN RAKYAT RANCACILI CROSS 1 TAHAP 3


LOKASI : KOTA BANDUNG
TAHUN ANGGARAN : 2023

HARGA SATUAN
NO. URAIAN SATUAN
(RP)

C BAHAN LOGAM dan BAHAN JADINYA


1 Baja Tulangan Polos, BJTP, U24, fy240 Mpa kg 11,800.00
2 Baja Tulangan Deform/Ulir, BJTD, fy400 Mpa kg 12,500.00
3 Wiremesh M8, 2,1 x 5,4 meter, Mutu Baja U50 kg 11,880.00
4 Kawat beton kg 20,000.00
5 Baja Profil, IWF/INP/DIR/DIN/CHANEL kg 18,500.00
Besi CNP 100.50.25.1,3 kg 16,680.33
Besi Hollow 20 x 40 x 2.3mm kg 3,500.00
Plat Besi 1 mm kg 16,685.20
6 Paku ukuran 1cm-3cm kg 25,000.00
7 Paku ukuran 4cm-12cm kg 20,000.00
8 Paku Sekrup 3" bh 50.00
9 Paku Pisher 3" bh 500.00
10 Ram Shet 12 cm s/d 20 cm bh 4,290.00
11 Paku Ripet bh 330.00
12 Pasang Hand Railling Stainless Steel m1 750,000.00
13 Pasang Railling Stainless Steel m1 750,000.00
12 Angkur Baut HTB M20 ASTM1554 GRADE 36 bh 157,300.00
13 Angkur Baut HTB M22 ASTM1554 GRADE 36 bh 203,940.00
14 Hollow Alumunium 40x40mm m1 6,500.00
15 Ram Kawat Galvanis 1/4" m2 25,000.00
16 Hand Railing Stainless Steel Dia. 2" RK201 m1 80,000.00
17 Hollow Besi 40x60mm, t = 2 mm m1 36,000.00
17 Kawat Harmonika PVC dia. 3mm M' 55,000.00
18 Besi Siku L 50.50.5 kg 14,000.00
19 Mur+Ring M16 bh 7,000.00
20 Mur+Ring M20 bh 4,000.00
21 Mur+Ring M22 bh 6,000.00
22 Mur+Ring M24 bh 9,500.00
23 Pipa Besi Sch. 40 Dia. 8" m1 800,000.00
24 Kawat Las kg 28,500.00
25 Hollow Besi 40x40 m1 40,000.00
26 Besi Siku L 60.60.6 kg 13,000.00
27 Baut HTB ASTM A-325 M20, l = 50 mm bh 8,000.00
28 Baut HTB ASTM A-325 M22, l = 50 mm bh 13,000.00
29 Baut HTB ASTM A-325 M24, l = 50 mm bh 16,000.00
30 Wiremesh M10, 2,1 x 5,4 meter kg 10,000.00
31 Hollow Alumunium 40x20mm, t = 2 mm m1 19,000.00
32 Pipa Besi Sch. 40 Dia. 2" m1 111,000.00
33 Pipa Besi Sch. 40 Dia. 4" m1 325,000.00
34 Pipa Besi Sch. 40 Dia. 3" m1 190,000.00
35 Baja Built Up Costume kg 16,500.00
36 Base Plate kg 12,000.00
37 Pipa Stainless Steel SS304 Dia. 2" m1 120,000.00
38 Pipa Stainless Steel SS304 Dia. 4" m1 370,000.00
39 Pagar BRC Galvanis Hotdip Uk. 120x240 lbr 318,000.00
40 Tiang Pagar BRC Galvanis Hotdip t=180 cm unit 120,000.00
41 Plat Besi Motif Kayu m2 820,000.00
42 Seng Gelombang BJLS 28 Lbr 75,000.00
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PEMBANGUNAN APARTEMEN RAKYAT RANCACILI CROSS 1 TAHAP 3


LOKASI : KOTA BANDUNG
TAHUN ANGGARAN : 2023

HARGA SATUAN
NO. URAIAN SATUAN
(RP)

43 Plat Strip 5 X 50 m1 10,000.00

D BAHAN PINTU dan JENDELA


1 Kusen Alumunium 4", Coating Putih m1 110,000.00
2 Daun Jendela Alumunium, Coating Putih m1 48,000.00
3 Daun Pintu Alumunium, Coating Putih m1 86,000.00
4 U-Alumunium m1 24,333.33
5 Rangka Kaca Curtainwall, 5 cm x 4,2 cm & 3,8 cm x 3,8 cm m2 92,000.00
6 Engineering Door Panel Kayu Oven, Honey Comb Double HPL, Wood unit 1,326,000.00
7 Jalusi Alumunium m2 98,000.00
8 Engsel Pintu,Stainless Steel 4"x3"x2" SOLID psg 64,000.00
9 Engsel Casement Iron Friction Stay 8" psg 42,000.00
10 Casement Handle psg 12,000.00
11 Lever Handle, LHTR 0019 SSS+PSS psg 320,000.00
12 Lever Set, LS T6300 ET SSS psg 285,000.00
13 Cylinder, CYL TC DL65 mm SN bh 175,000.00
14 Sealant m1 3,500.00
15 Flushbolt 6"+12" psg 260,000.00
16 Mortise Lock MTS 8585 SSS bh 260,000.00
17 Floor Hinges, Setara Deckson FH 84 psg 845,000.00
18 Path Fitting, PT 10, 20+US 10, Setara Deckson psg 950,000.00
19 Panic Bar Handle Pintu Darurat Emergency PD 0701 DEKSON psg 1,650,000.00
20 Handle Pintu Besi, pipa plat besi psg 175,000.00
21 Handle Pintu Alumunium Stainless, SOLID HPAL 61.41 psg 172,000.00
22 Body Kunci Alumunium / lockcase SOLID LC 516 AL - 30 bh 87,000.00
23 Silinder Kunci by SOLID DC SCR 802-60 MM bh 74,000.00
24 Handle + Kunci Pintu Bulat Stainless bh 72,000.00
25 Sliding Door Rail Set D3 set 385,000.00
26 Pintu Alumunium Spandrell bh 320,000.00
27 Pintu Kayu double Teakwood bh 1,120,000.00
28 Engsel Bubut Pintu Besi psg 48,000.00
29 Kaca polos 5 mm m2 140,000.00
30 Kaca Tempered 10 mm m2 550,000.00
31 Kaca Cermin 5 mm m2 420,000.00
32 Kaca Tempered, t = 12 mm m2 575,000.00
33 Kaca 8 mm Stopsol Dark Blue bh 586,000.00
34 Karet Kaca m' 14,000.00
35 Pintu PVC uk. 70 cm x 200 cm unit 240,000.00
36 Grendel Pintu Besi bh 48,000.00
37 Slot Pintu Kecil bh 32,000.00
38 Pull Handle bh 24,000.00
39 Expanded Metal t = 3mm m2 185,000.00
40 Pintu Emergency tanpa kaca unit 7,250,000.00
41 Pintu Emergency dengan kaca khusus unit 10,450,000.00
42 Engsel Solid 5 inch/ Engsel Pintu 5" bh 78,000.00
43 Door Closer Solid DC20 SLD HO bh 345,000.00

E BAHAN ATAP
1 Rangka Atap Baja Ringan (Kaso-kaso+Reng) m2 162,000.00
2 Rangka Atap Baja Ringan m2 162,000.00
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PEMBANGUNAN APARTEMEN RAKYAT RANCACILI CROSS 1 TAHAP 3


LOKASI : KOTA BANDUNG
TAHUN ANGGARAN : 2023

HARGA SATUAN
NO. URAIAN SATUAN
(RP)

3 Penutup Atap Spandek t=0,3 mm bh 72,000.00


4 Nok Spandek bh 32,000.00
5 Listplank GRC, Lebar 30 cm m1 24,000.00
3 Underlayer Technowood t= 9mm lbr 278,000.00
1 Pasang Kaca Tempered, t = 12 mm m2 845,000.00
1 Penutup Atap Alang-Alang Sintetis m2 1,652,000.00

F BAHAN PLAFOND
1 Hollow Galvanis untuk Plafond 40x40mm, t = 0,4 mm m1 10,200.00
2 Sekrup Gypsum/GRC kg 32,000.00
3 GRC 1200x2400, t= 4 mm lbr 52,000.00
4 Gypsumboard 120 x 240 t = 9 mm lbr 54,000.00
5 Semen Compound Adhesive, @20kg kg 3,200.00
6 Joint Tape @75 m roll 38,000.00
7 Metal Furing CST 300x0.5 mm m1 5,600.00
8 Tie Rod M4 m1 2,000.00
9 Shadowline t=0,4mm m1 4,500.00

G BAHAN PELAPIS LANTAI dan DINDING


1 Marmer Travertine uk. 100 x 100 bh 2,180,000.00
2 Granite Tile 60X60 Polished, Hitam m2 210,000.00
3 Granite Tile 60X60 Rustic/Unpolished m2 200,000.00
4 Keramik 30 x 30 m2 105,000.00
5 Keramik 30 x 30 Antislip m2 108,000.00
6 Keramik 20 x 20 Unpolished m2 92,000.00
7 Plint Keramik 10 x 30 Polished bh 3,400.00
8 Keramik Motif 20 x 25 polished bh 2,800.00
9 Keramik Border 10 x 20 polished bh 1,800.00
10 Alumunium Composite Panel Alloy 3003 m2 425,000.00
11 Busa Pengisi 100x50x3 cm m2 48,000.00
12 Laser Cutted Alumunium Composite Panel m2 520,000.00
13 List Siku Stainless 5x5x120 cm t=0,8 mm m' 114,000.00
14 Kulit MB-Tech m2 132,000.00
15 Karpet Roll Lebar 4m m2 86,000.00
16 Glasswool 4cm m2 38,000.00
17 Granit Slab Golden Black + Pemasangan m2 984,000.00
18 SIKA TOP Seal 107 AB 25 kg kg 14,000.00

H BAHAN FINISHING/PENGECATAN/LABURAN
1 Cat Dasar Jotun kg 32,000.00
2 Cat Dinding Interior Jotun Jotaplast kg 36,000.00
3 Cat Dinding Exterior Jotun Toughshield kg 48,000.00
4 Cat kayu/besi ex. Seiv kg 45,000.00
5 Coating Kayu Ultran Lasur kg 96,000.00
6 Vernis ltr 60,000.00
7 Plamir ex. Nippon Matex kg 14,200.00
8 Terpentin/Pengencer ex. ND ltr 18,000.00
9 Kwas 4" bh 18,000.00
10 Roll Cat bh 24,000.00
11 Ampelas lbr 4,000.00
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PEMBANGUNAN APARTEMEN RAKYAT RANCACILI CROSS 1 TAHAP 3


LOKASI : KOTA BANDUNG
TAHUN ANGGARAN : 2023

HARGA SATUAN
NO. URAIAN SATUAN
(RP)

12 Cat Menie kg 31,000.00


13 Thinner liter 21,000.00
14 HPL, 1,20x2,40 lbr 210,000.00
15 Melamine, 1,20x2,40 lbr 155,000.00
15 Cairan Pencuci Granit liter 56,000.00
16 Cat Lapangan kg 38,000.00
17 Jack Hammer hari 175,000.00
18 Solar Non-subsidi liter 10,560.00
19 Zincromat kg 56,000.00
20 Genset Las hari 485,200.00
21 Minyak Pelumas liter 18,000.00
22 Wood Filler kg 54,000.00
23 Woodstain kg 64,000.00
24 Sanding kg 69,500.00
25 Melamic kg 98,700.00

II. JENIS TENAGA KERJA


HARGA SATUAN
NO. URAIAN SATUAN
(RP)
1 Pekerja Orang / Hari 168,685.00
2 Tukang Orang / Hari 170,371.00
3 Kepala Tukang Orang / Hari 177,119.00
4 Mandor Orang / Hari 185,553.00
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PEMBANGUNAN APARTEMEN RAKYAT RANCACILI CROSS 1 TAHAP 3


LOKASI : KOTA BANDUNG
TAHUN ANGGARAN : 2023

HARGA SATUAN
NO. URAIAN SATUAN
(RP)

K MEKANIKAL & SANITAIR


1 Pipa PVC AW dia. 150 mm / 6" Rucika Wavin m' 182,000.00
2 Pipa PVC AW dia. 100 mm / 4" Rucika Wavin m' 116,000.00
3 Pipa PVC AW dia. 90 mm / 3" Rucika Wavin m' 80,000.00
4 Pipa PVC AW dia. 65 mm / 2,5" Rucika Wavin m' 46,000.00
5 Pipa PVC AW dia. 50 mm / 2" Rucika Wavin m' 37,000.00
6 Pipa PVC AW dia. 20 mm / 3/4" Rucika Wavin m' 11,600.00
7 Pipa GIP dia. 20 mm / 3/4" SPINDO m' 54,000.00
8 Pipa GIP dia. 50 mm / 2" SPINDO m' 160,000.00
9 Pipa GIP dia. 65 mm / 2,5" SPINDO m' 200,000.00
10 Pipa Hitam Sch 40 / PPI 1" SPINDO m' 62,000.00
11 Pipa Hitam Sch 40 / PPI 1 1/4" SPINDO m' 85,000.00
12 Pipa Hitam Sch 40 / PPI 2" SPINDO m' 126,000.00
13 Pipa Hitam Sch 40 / PPI 2,5" SPINDO m' 210,000.00
14 Pipa Hitam Sch 40 / PPI 3" SPINDO m' 271,000.00
15 Pipa Hitam Sch 40 / PPI 4" SPINDO m' 387,000.00
16 Kloset TOTO CCW 633 J - CW633 AJA unit 1,436,000.00
17 Hand Shower ONDA SO 230 + Kran Cabang Double K 406 CTG unit 314,000.00
18 Floor Drain GOT Kamar Mandi WC ONDA FLS 01 1 1/2" bh 86,000.00
19 Jet Shower Wasser WS 88TS unit 124,000.00
20 Bak Cuci Piring ROYAL SB42 48x40x15 Cm unit 235,000.00
21 Kran Angsa Tembok ONDA V 632 CA 1/2 bh 116,000.00
22 Fitting PVC Rucika C O 3 - Clean Out" bh 24,000.00
23 Seal tape bh 4,000.00

L ALAT PENGEBORAN & ALAT LAINNYA

1 Mobilisasi dan Demobilisasi Alat Bored Pile ls 13,200,000.00


2 Pemotongan Kepala Tiang Pancang ttk 87,000.00
3 Biaya Pengeboran Tanah, Meliputi: m'
• Pembersihan, perataan dan pengerasan lokasi
untuk posisi tumpuan mesin bor
• Pembuatan bak Lumpur, bak control dan selokan
untuk sirkulasi Lumpur bor
• Penanaman casing pengaman sedalam 1-2 m
pada posisi titik bor apabila formasi lapisan tanah
paling atas yang akan dibor merupakan lapisan
formasi yang mudah runtuh
4 Sewa Alat Stang Bor dia. 1,25" Sewa/hari 175,000.00
5 Sewa Alat Mata Bor 4" Sewa/hari 175,000.00

N MEKANIKAL,ELEKTRIKAL
1 NYM 3 x 2.5 mm2 + Conduit m' 19,600.00
2 NYM 3 x 2.5 mm2 m' 15,100.00
3 NYM 3 x 4 mm2 m' 23,250.00
4 NYY 1 x 95 mm2 m' 159,100.00
5 NYY 1 x 150 mm2 m' 245,450.00
6 NYY 3 x 4 mm2 m' 26,750.00
7 NYY 3 X 10 mm2 m' 60,400.00
8 NYY 4 x 2.5 mm2 m' 34,000.00
9 NYY 4 x 4 mm2 m' 47,450.00
10 NYY 4 x 6 mm2 m' 61,850.00
11 NYY 4 x 10 mm2 m' 88,650.00
12 NYY 4 x 16 mm2 m' 120,200.00
13 NYY 4 x 25 mm2 m' 184,900.00
14 NYY 4 x 35 mm2 m' 251,750.00
15 NYY 4 x 50 mm2 m' 334,250.00
16 NYY 4 x 70 mm2 m' 474,100.00
17 NYY 4 x 95 mm2 m' 652,900.00
18 NYY 4 x 120 mm2 m' 820,450.00
19 NYY 4 x 150 mm2 m' 1,009,450.00
20 NYY 4 x 185 mm2 m' 1,259,050.00
21 NYY 4 x 240 mm2 m' 1,657,950.00
22 NYFGbY 3 x 10 mm2 m' 70,150.00
23 NYFGbY 4 x 6 mm2 m' 61,850.00
24 N2XSEFGby 3x185 mm2 m' 1,683,500.00
25 N2XSY 1X95 mm2 m' 242,200.00
26 BC 2 x 35 mm2 m' 62,850.00
27 Kabel Tray U W200xH100 m' 215,400.00
28 Kabel Tray U W250xH100 m' 242,250.00
29 Kabel Tray U W300xH100 m' 269,100.00
30 Inside Riser Tray W200xH100 m' 285,000.00
31 Inside Riser Tray W250xH100 m' 320,000.00
32 Inside Riser Tray W300xH100 m' 347,000.00
33 Outside Riser Tray W200xH100 m' 235,000.00
34 Outside Riser Tray W250xH100 m' 248,000.00
35 Outside Riser Tray W300xH100 m' 302,000.00
36 CrossTray W200xH100 m' 492,000.00
37 CrossTray W250xH100 m' 524,000.00
38 CrossTray W300xH100 m' 578,000.00
39 Pas Titi Instalasi Lampu NYM 3x2,5 mm2+ PVC Conduit dia 20 mm ttk 170,000.00
40 Pas Titi Instalasi Stop Kon+ PVC Conduit dia. 20 mm ttk 312,000.00
41 Inside Riser Tray W300xH100 bh 344,000.00
42 Pas. Lampu Fitting Roset E27 + Bohlam LED 12 Watt bh 54,000.00
43 Pas. Lampu Tl-Balk 1x36 Watt bh 82,000.00
44 Pas. Lampu LED Baret 20 Watt bh 215,000.00
45 Pas. Lampu Exit 8 Watt bh 174,000.00
46 Kabel Ladder W200xH100 bh 427,000.00
47 Kabel Ladder W300xH100 bh 446,000.00
48 Pas. Saklar Seri bh 24,000.00
49 Pas. Saklar Tunggal bh 16,000.00
50 Stop Kontak 16 A bh 28,000.00
51 Penangkal Petir Elektrostatis bh 15,250,000.00
52 Arester Lightning protection radius 50 meter bh 6,120,000.00
53 Grounding System max. 2 ohm bh 3,150,000.00
54 Genset 1x200 kVA set 415,000,000.00
55 Panel Kontrol Generator set 88,000,000.00
56 Tanki Solar 1000 liter set 12,500,000.00
57 Transformer Type Oil Imersed 630 kVA set 88,000,000.00
58 Panel Utama Tegangan Menengah (PUTM) set 67,000,000.00
59 Panel Utama Tegangan Rendah (PUTR) set 96,000,000.00
60 Panel Capasitor Bank 10x15 kVAR set 86,000,000.00
61 Copper Rod, kabel BC, clamp rod, Bar CU, Bak kontrol 300x300x300mm set 1,750,000.00
62 Down Conduktor 1 X 7 0mm2 + accessories set 80,000.00
63 Tiang pipa penangkal petir set 70,000.00
64 bak control set 350,000.00
65 PP Hunian Lt. 5-9 set 17,500,000.00
66 P kWh-Meter Kamar Hunian + Box MCB set 4,200,000.00
67 PP Service Lt. 5-9 set 6,400,000.00
68 PP Pompa Booster set 4,700,000.00
69 PP Pompa Presurized fan set 5,400,000.00
70 PP Lift Penumpang 1 set 6,800,000.00
71 PP Lift Barang set 7,400,000.00
72 Panel ATS 500 KVA unit 112,000,000.00

MATV
1 LNB bh 520,000.00
2 PRE AMP bh 460,000.00
3 Power Divider bh 4,850,000.00
4 Demodulator bh 1,150,000.00
5 Modulator bh 480,000.00
6 Active Combiner bh 815,000.00
7 Coaxial 75 ohm m 15,000.00
8 Termination & supporting material lot 492,000.00
9 Splitter 4 way bh 110,000.00
10 Terminal Box Splitter TV bh 245,000.00
11 TV outlet bh 45,000.00
12 Instalasi TV outlet ttk 210,000.00

CCTV
1 DVR bh 3,000,000.00
2 Battery & Charger 4 jam bh 1,965,000.00
3 Dome pan tilt Camera bh 3,550,000.00
4 Stop Kontak 1 fasa bh 48,000.00
5 kabel RG11 + Conduit HI dia 25 mm2 Instalasi camera CCTV ttk 380,000.00
6 NYM 3x2.5 + Conduit HI dia 25 mm2 Instalasi stop kontak 1 fasa ttk 520,000.00

TATA SUARA
1 Power Amplifier bh 2,700,000.00
2 Mixer bh 3,100,000.00
3 Mic bh 1,600,000.00
4 Rak sound system bh 1,800,000.00
5 Terminal box sound system (TBSS) bh 260,000.00
6 NYMHY 3x2.5 mm2 + Conduit dia. 20 mm m 15,100.00
7 Wall Speaker 10 Watt bh 540,000.00
8 JB-SS bh 620,000.00
9 Steel box Speaker 6 watt bh 115,000.00
10 NYMHY 2x1.5 mm2 + Conduit dia. 20 mm2 Instalasi kabel speaker ttk 64,000.00
11 Equalizer bh 3,400,000.00

FIRE ALARM
1 MCFA. Kapasitas 20 Zone bh 15,400,000.00
2 Rectifier bh 450,000.00
3 Power surge arrester bh 2,700,000.00
4 Battery & Charger 4 jam bh 1,500,000.00
5 Grounding untuk MCFA dan Surge Arrester (R<0.5 Ohm) lot 500,000.00
6 TB-FA bh 285,000.00
7 Smoke Detector bh 345,000.00
8 Rate of rise detector bh 85,000.00
9 Manual Push button bh 140,000.00
10 Indikator Lamp bh 43,000.00
11 Bell alarm bh 180,000.00
12 End of line resistor bh 42,000.00
13 Instalasi peralatan Alarm NYA 2x1.5 mm2 di Conduit dia.20 mm
14 - Instalasi Rate of rise detector ttk 82,000.00
15 - Instalasi Smoke detector ttk 114,000.00
16 - Instalasi Manual Push button ttk 140,000.00
17 - Instalasi Indikator Lamp ttk 140,000.00
18 - Instalasi Bell alarm ttk 140,000.00
19 - Instalasi End of line resistor ttk 140,000.00

Ventilasi
1 Exhaust fan 840 cmh unit 1,830,000.00
2 Exhaust fan 1080 cmh unit 2,584,000.00
3 AC 1 PK unit 4,750,000.00
4 AC 2 PK unit 8,620,000.00

PLUMBING AIR BERSIH & AIR KOTOR


1 Pompa Transfer : 400 l/m ; 50 M ; 7.5 kW ; 2900 RPM unit 51,373,575.00
2 Pompa Booster : 450 l/m ; 20 M ; 4 kW ; 2900 RPM unit 41,526,210.00
3 Water Treatment Pump : 300 l/m ; 30 M ; 4 kW ; 2900 RPM unit 33,980,430.00
4 Deep Well Pump : 150 l/m ; 65 M ; 4 kW ; 2900 RPM unit 40,271,022.00
5 Submersible Pump : 300 l/m ; 12 M ; 1.5 kW ; 1500 RPM unit 13,391,040.00
6 Submersible Pump : 400 l/m ; 18 M ; 3.7 kW ; 1500 RPM unit 24,786,300.00
7 Roof tank : 12 m3 unit 40,846,080.00
8 Roof tank : 24 m3 unit 81,692,160.00
9 Sand Filter : 20 m3/h unit 29,000,000.00
10 Carbon Filter : 20 m3/h unit 42,000,000.00
11 Sewage Treatment Plant : 35 m3/h unit 135,000,000.00
12 Grease Trap : 6 m3/hari unit 28,000,000.00

Pipa Galvanis
1 -Dia. 2-1/2" m 120,000.00
2 -Dia. 2'' m 86,000.00
3 -Dia. 3/4" m 32,000.00

Pipa PVC
1 -Dia. 4" m 74,000.00
2 -Dia. 3" m 52,000.00
3 -Dia. 2'' m 24,000.00
4 -Dia. 1" m 12,000.00
5 -Dia. 3/4" m 9,000.00

Header
1 -Dia. 4" m 210,000.00
2 -Dia. 3" m 150,000.00

Gate Valve
1 -Dia. 2-1/2" bh 940,000.00

Check Valve
1 -Dia. 2-1/2" bh 3,100,000.00

Flexsible Joint
1 -Dia. 2-1/2" bh 500,000.00

Strainer
1 -Dia. 2-1/2" bh 750,000.00
Foot Valve
1 -Dia. 3" bh 1,050,000.00

Float Valve
1 -Dia. 2'' bh 700,000.00
2 Meter Air bh 120,000.00

PLUMBING HYDRANT
1 Pompa Diesel Hydrant unit 348,600,000.00
2 Pompa Elektrik Hydrant unit 289,200,000.00
3 Pompa Jockey Hydrant unit 26,000,000.00
4 Pipa BSH 40
5 -Dia. 8" m 350,000.00
6 -Dia. 6" m 243,000.00
7 -Dia. 4" m 128,000.00
8 -Dia. 3" m 96,000.00
9 -Dia. 2-1/2" m 75,000.00
10 -Dia. 11/2" m 31,000.00
11 -Dia. 1" m 21,000.00
12 Outdoor Hydrant Box set 4,600,000.00
13 Pillar Hydrant set 3,200,000.00
14 Siamese connection set 4,320,000.00
15 Indoor Hydrant Box set 6,871,000.00
16 Sprinkler bh 28,000.00
17 Fire Extinguisher / APAR 3,5 kg bh 375,000.00
18 Fire Extinguisher / APAR 25 kg bh 3,120,000.00

PEKERJAAN LIFT
Pengadaan dan pemasangan Lift penumpang set 1,642,000,000.00
Kapasitas : 1150 Kg
Kecepatan : 105
Tipe : Traksi
Home Engine/ Frame Engine (included)
ARD bh 41,000,000.00
Pengadaan dan pemasangan Lift Barang set 1,575,000,000.00
Kapasitas : 1000 Kg
Kecepatan : 90
Tipe : Traksi
Home Engine/ Frame Engine (included)
ARD bh 41,000,000.00
Pengadaan dan pemasangan Lift Barang Untuk Proyek selama 5 bln set 117,000,000.00
Kapasitas : 1000 Kg
Kecepatan : 90
Tipe : Traksi
Home Engine/ Frame Engine (included)