Anda di halaman 1dari 127

LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Nomor
Tanggal
Tentang Penetapan Standardisasi Harga Satuan Jadi
di lingkungan Dinas Pekerjaan Umum Kota Manado

DAFTAR HARGA SATUAN BAHAN

SATUAN HARGA KET


NO. JENIS BAHAN
(Rp.)

1 Agregat Base Kelas A M³ 417,410.00


2 Agregat Base Kelas B M³ 332,780.00
3 Agregat Base Kelas C M³ 357,430.00
4 Agregat Halus M³ 362,240.00
5 Agregat Kasar M³ 362,240.00
6 Agregat Pecah Mesin 0-5 mm M3 803,910.00
7 Agregat Pecah Mesin 20-30 mm M3 639,850.00
8 Agregat Pecah Mesin 50-70 mm M3 574,230.00
9 Agregat Pecah Mesin 5-10 & 10-20 mm M3 672,660.00
10 Air Ltr 160.00
11 Alang-alang Ikat 32,810.00
12 Anchorage buah 1,748,250.00
13 Anti strpping agent liter 65,630.00
14 Arbocell Kg. 42,000.00
15 Asbuton Halus Ton 7,797,560.00
16 Asbuton yang diproses Kg 77,980.00
17 Aspal KG 12,000.00
18 Aspal Emulsi Kg 7,230.00
19 Aspal Hotmix (Ready Mix) Ton 1,706,250.00
20 Assetilline Botol 301,230.00
21 Bahan Modifikasi Kg 1,310.00
22 Bahan pengawet: kreosot liter 6,560.00
23 Bahan Pengisi (Filler) Tambahan Kg 1,580.00
24 Bahan Pilihan M3 89,340.00
25 Bahan Tanah Timbunan M3 71,480.00
26 Baja Bergelombang Kg 14,240.00
27 Baja Prategang Kg 15,750.00
28 Bata merah Bh 990.00
29 Batako Uk. 20 x 40 x 10 Bh 2,630.00
30 Batu Alam 10 x 20 M² 150,940.00
31 Batu apung Kg 7,880.00
32 Batu Bara Kg 790.00
33 Batu Bata Klinker Uk. 5 x 5 x 25 Bh 1,980.00
34 Batu Belah / Batu Kali / Batu Gunung M³ 294,000.00
35 Batu Belah / Kerakal M3 248,060.00
36 Batu Belah Uk. 15 - 20 M³ 248,060.00
37 Batu Boulder M³ 262,500.00
38 Batu Bunga (Alam) M² 164,060.00
39 Batu Candi 10 x 20 M² 183,750.00
40 Batu Candi 30 x 30 M² 203,440.00
41 Batu Green Bally 15 x 30 M² 242,810.00
42 Batu Green Bally 20 x 40 M² 242,810.00
43 Batu Palimanan 10 x 20 M² 190,310.00
44 Batu Palimanan 15 x 30 M² 216,560.00

Halaman 1 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
45 Batu Palimanan 20 x 40 M² 223,130.00
46 Batu Palimanan 30 x 30 M² 223,130.00
47 Batu Sukabumi 10 x 20 M² 170,630.00

Halaman 2 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
48 Batu Sukabumi 15 x 15 M² 150,940.00
49 Bensin / Premium (HET) Ltr 5,910.00
50 Bensin / Premium (Industri) Ltr 12,990.00
51 Bunker Oil Liter 2,990.00
52 Butonite Patch Kg 31,830.00
53 Cansteen Bh 59,060.00
54 Casing M2 32,810.00
55 Cerucuk M 19,690.00
56 Chipping Kg 1,580.00
57 Chipping Kg 1,580.00
58 Curing Compound Ltr 50,540.00
59 Ducting (Kabel prestress) M' 196,880.00
60 Ducting (Strand prestress) M' 65,630.00
61 Elastomer buah 853,130.00
62 Elastomer Alam Kg 59,060.00
63 Elastomer jenis 1 buah 556,560.00
64 Elastomer jenis 2 buah 938,440.00
65 Elastomer jenis 3 buah 1,209,860.00
66 Elastomer Sintesis Kg 59,060.00
67 Expansion Cap M2 7,940.00
68 Expansion Join Baja Siku M 360,940.00
69 Expansion Join Tipe Rubber M 1,575,000.00
70 Expansion Joint Tipe Torma M1 1,575,000.00
71 Expansion Tipe Joint Asphaltic Plug M 1,350,300.00
72 Filler Kg 1,580.00
73 Filler Kg 1,580.00
74 Gravel M3 353,330.00
75 Gebalan Rumput M² 15,750.00
76 Geotextile M¹ 8,540.00
77 Hollow Brick Bh 4,600.00
78 Ijuk Kg 16,410.00
79 Joint Sealent Kg 44,760.00
80 Joint Socket Pile 16x16x16 Set 88,600.00
81 Joint Socket Pile 35x35 Set 797,350.00
82 Kapur M3 52,500.00
83 Kapur Padam M³ 98,440.00
84 Kapur sirih Kg 1,190.00
85 Karet Elastomer Bh 853,130.00
86 Kerb jenis 1 Buah 59,060.00
87 Kerb jenis 2 Buah 65,630.00
88 Kerb jenis 3 Buah 72,190.00
89 Kerb Type A Buah 59,060.00
90 Kerikil Beton M³ 362,240.00
91 Kerikil Koral Uk. 1 - 3 cm M³ 362,240.00
92 Koral Sikat 2 - 3 cm Kg 13,130.00
93 Koral Sikat Panca Warna Kg 9,850.00
94 Mikro Pile 16x16x16 M1 79,740.00
95 Mini Timber Pile Buah 35,440.00
96 Minyak Bekisting Ltr 13,790.00
97 Minyak Fluks Liter 2,394.00
98 Minyak Pelumas / Oli (Pertamina) Ltr 38,730.00
99 Minyak Pelumas / Oli (Shell) Ltr 59,060.00
100 Minyak Pelumas / Olie LITER 38,730.00
101 Minyak Tanah / Kerosine (Industri) Ltr 13,330.00
102 Oxygen Botol 150,610.00

Halaman 3 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
103 Pasir Kasar/ Urug M³ 231,660.00
104 Pasir Pasang / Beton M³ 231,660.00
105 Paving Stone Bh 5,910.00
106 S o l a r (HET) Ltr 6,500.00
107 S o l a r (Industri) Ltr 10,750.00
108 Semen PC Kg 1,580.00
109 Semen Putih Kg 3,290.00
110 Semen Warna Kg 15,750.00
111 Sirtu Alam M³ 168,260.00
112 Storox-100 Kg 65,630.00
113 Tanah Biasa M³ 71,480.00
114 Tanah Liat M³ 65,630.00
115 Tanah Pilihan M³ 89,340.00
116 Trihex Paving Bh 3,940.00
117 Additive Ltr 50,540.00
118 Bahan Agr.Base Kelas C2 M3 108,150.00
119 Pasir Halus (untuk HRS) M3 254,830.00
120 Pasir Tailing M3 339,940.00
121 Pasir Urug M3 231,660.00
122 Pasir Urug (ada unsur lempung) M3 231,660.00
123 Besi Hollow 2 x 4 cm M¹ 63,530.00
124 Besi Hollow 4 x 4 cm M¹ 84,280.00
125 Besi Profil Kg 22,980.00
126 Besi Siku 3 x 3 x 2 M¹ 52,500.00
127 Besi Siku 3 x 3 x 3 M¹ 75,480.00
128 Besi Siku 4 x 4 x 3 M¹ 85,310.00
129 Besi Siku 4 x 4 x 4 M¹ 121,410.00
130 Besi Siku 5 x 5 x 5 M¹ 195,180.00
131 Besi Stainlessteel 1 1/2" M¹ 157,500.00
132 Besi Stainlessteel 1 1/4" M¹ 150,940.00
133 Besi Stainlessteel 1" M¹ 144,380.00
134 Besi Stainlessteel 1/2" M¹ 101,730.00
135 Besi Stainlessteel 2" M¹ 183,650.00
136 Besi Stainlessteel 3" M¹ 157,500.00
137 Besi Stainlessteel 3/4" M¹ 124,690.00
138 Besi Stainlessteel 4" M¹ 315,000.00
139 Besi strip Kg 115,500.00
140 Besi Warmesh θ 10 Unit 1,279,690.00
141 Besi Warmesh θ 6 Unit 465,940.00
142 Besi Warmesh θ 8 Unit 767,810.00
143 Bois Beton dia. 100 cm (pakai tulangan) Bh 367,500.00
144 Bois Beton dia. 100 cm (tanpa tulangan) Bh 262,500.00
145 Bois Beton dia. 150 cm (pakai tulangan) Bh 459,380.00
146 Bois Beton dia. 150 cm (tanpa tulangan) Bh 301,880.00
147 Bois Beton dia. 60 cm (pakai tulangan) Bh 262,500.00
148 Bois Beton dia. 60 cm (tanpa tulangan) Bh 196,880.00
149 Bois Beton dia. 80 cm (pakai tulangan) Bh 328,130.00
150 Bois Beton dia. 80 cm (tanpa tulangan) Bh 210,000.00
151 Kawat baja Kg 39,380.00
152 Kawat Beronjong Kg 23,630.00
153 Kawat Beronjong (Jadi) dia. 2,7 mm ( 2 x 1 x 0,5 ) M³ 496,560.00
154 Kawat Beronjong (Jadi) dia. 2,7 mm ( 3 x 1 x 0,5 ) M³ 682,500.00
155 Kawat Beronjong (Jadi) dia. 3,0 mm ( 2 x 1 x 0,5 ) M³ 551,250.00
156 Kawat Beronjong (Jadi) dia. 3,0 mm ( 3 x 1 x 0,5 ) M³ 826,880.00
157 Kawat Beton / Bendrat Kg 26,250.00

Halaman 4 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
158 Kawat Duri Kg 26,250.00
159 Kawat jaring galvanis M¹ 52,500.00
160 Kawat Las Kg 32,810.00
161 Pagar BRC (BRC Fence) ; tinggi = 120 cm M¹ 787,500.00
162 Pagar BRC (BRC Fence) ; tinggi = 175 cm M¹ 853,130.00
163 Pagar BRC (BRC Fence) ; tinggi = 90 cm M¹ 656,250.00
164 Paku Asbes bh Bh 1,110.00
165 Paku Beton Kg 32,810.00
166 Paku Genteng Metal Kg 39,380.00
167 Paku Kayu 2" s/d 6" Kg 22,980.00
168 Paku pancing Kg 26,250.00
169 Paku Reng Kg 22,980.00
170 Paku Sekrup Kg 72,190.00
171 Paku Seng Kg 28,880.00
172 Paku Tripleks Kg 29,540.00
173 Pintu gulung besi M² 984,380.00
174 Plat Rambu Bh 265,260.00
175 Profil alumunium "T" M¹ 26,250.00
176 Rel Pengaman (Guard Rail) M¹ 170,630.00
177 Rolling Door M² 2,296,880.00
178 Sekrup fixer Bh 260.00
179 Sekrup Galbani Bh 790.00
180 Strip Bearing Buah 301,230.00
181 Besi Beton Polos Kg 13,000.00
182 Besi Beton Polos dia. 10 mm Ujung 78,750.00
183 Besi Beton Polos dia. 12 mm Ujung 105,000.00
184 Besi Beton Polos dia. 14 mm Ujung 164,060.00
185 Besi Beton Polos dia. 16 mm Ujung 210,000.00
186 Besi Beton Polos dia. 6 mm Ujung 39,380.00
187 Besi Beton Ulir Kg 14,240.00
188 Besi Beton Ulir dia. 14 mm Ujung 168,660.00
189 Besi Beton Ulir dia. 16 mm Ujung 206,500.00
190 Besi Beton Ulir dia. 18 mm Ujung 285,550.00
191 Besi Beton Ulir dia. 20 mm Ujung 421,980.00
192 Besi Beton Ulir dia. 22 mm Ujung 400,150.00
193 Besi Beton Ulir dia. 24 mm Ujung 524,350.00
194 Semen tahan Asam Kg -
195 Tiang Pancang Baja M' 49,700.00
196 Beton Roster Uk. 20x20 cm Bh 16,410.00
197 Beton Roster Uk. 20x40 cm Bh 19,690.00
198 Ijuk M³ 52,500.00
199 Matras Concrete Buah 531,560.00
200 Residu Lt 42,660.00
201 Roster Kaca Uk. 20x20 cm Bh 29,540.00
202 Roster Uk. 20x20 cm (keramik) Bh 49,230.00
203 Roster Uk. 40x40 cm (keramik) Bh 65,630.00
204 Tali ijuk Kg 32,810.00
205 Ampelas Lbr 3,940.00
206 Cat Dasar /Alkali (Dulux/ Setara) Kg 65,630.00
207 Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) Kg 59,060.00
208 Cat Marka Kg 143,990.00
209 Cat Marka (Non Thermoplas) Kg 108,030.00
210 Cat Menie Kayu/Besi/Seng (Glotex Setara) Kg 52,500.00
211 Cat Multiguard Kg 59,060.00
212 Cat Tembok (Dulux/ICI setara) Kg 84,000.00

Halaman 5 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
213 Cat Tembok (Metrolite/ Catylac/ Setara) Kg 26,250.00
214 Cat Tembok Biasa Kg 19,690.00
215 Cat Waterproofing (Setara Aquaproof) Kg 65,630.00
216 Compound Gypsum Kg 13,130.00
217 Dempul Besi Kg 65,630.00
218 Dempul Kayu/Wood Filler (Impra Setara) Kg 52,500.00
219 Kuas Bh 15,750.00
220 Lem Eha-Bond Ltr 45,940.00
221 Minyak Cat / Thiner Ltr 26,250.00
222 Paper Tape M¹ 1,310.00
223 Plamir Kg 25,810.00
224 Plamur Tembok (Danapaint Setara) Kg 23,510.00
225 Polimer kg 59,060.00
226 Politur Ltr 49,230.00
227 Polytene 125 mikron Kg 25,260.00
228 Sherlak Kg 65,630.00
229 Soda api Kg 13,130.00
230 Spiritus Ltr 13,130.00
231 Teak oil Ltr 37,080.00
232 Kaca One Way 10 mm M² 1,312,500.00
233 Kaca One Way 5 mm M2 689,060.00
234 Rangka Aluminium 3" coklat Ujg 190,310.00
235 Rangka Aluminium 3" Silver Ujg 164,060.00
236 Rangka Aluminium 4" coklat Ujg 255,940.00
237 Rangka Aluminium 4" Silver Ujg 190,310.00
238 Kayu Acuan M3 1,800,000.00
239 Kayu Bakar M³ 262,500.00
240 Kayu Kelas I (Kayu Besi, dll.) M³ 10,000,000.00
241 Kayu Kelas I (Kayu Linggua,dll.) M³ 10,000,000.00
242 Kayu Kelas II (Kayu Cempaka, dll.) M³ 7,000,000.00
243 Kayu Kelas III (Kayu Nantu, dll.) M³ 5,000,000.00
244 Kayu Kelas IV (Kayu Telon, dll.) M³ 1,800,000.00
245 Kayu Perancah M3 2,100,000.00
246 Perancah kayu M³ 2,100,000.00
247 Aditif anti pengelupasan Kg 65,630.00
248 Cat Anti Karat Kg 48,180.00
249 Asbes Gelombang Besar Lbr 52,500.00
250 Asbes Gelombang Kecil Lbr 34,790.00
251 Atap alumunium gelombang tebal 0.55 mm M² 72,190.00
252 Atap Genteng Metal (setara Multi Roof) M² 90,240.00
253 Atap Genteng Metal (setara Sakura Roof:80 cmX 80 cm) M² 72,190.00
254 Atap Onduline Gelombang 0.95 * 1.95 M M² 106,310.00
255 Atap Spandek Ujg 85,310.00
256 Bubungan Genteng Metal (setara Multi Roof) Bh 62,350.00
257 Bubungan Genteng Metal (setara Sakura Roof) Bh 44,630.00
258 Eternit (Asbes) M² 39,380.00
259 Flashing Genteng Metal (setara Multi Roof) M¹ 39,380.00
260 Flashing Genteng Metal (setara Sakura Roof) M¹ 36,100.00
261 Genteng (setara Genteng Kodok) Bh 45,940.00
262 Genteng Aspal Lbr 91,880.00
263 Genteng Beton Lbr 39,380.00
264 Genteng Kaca Bh 59,060.00
265 Genteng Keramik Bh 39,380.00
266 Genteng Sirap Bh 6,560.00
267 Karpus Asbes Gelombang Besar Lbr 45,940.00

Halaman 6 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
268 Karpus Asbes Gelombang Kecil Lbr 30,190.00
269 Karpus Genteng (setara Genteng Kodok) Bh 22,980.00
270 Karpus Genteng Beton Bh 13,130.00
271 Karpus Genteng Keramik Bh 36,100.00
272 Kaso 3/5 Btg 29,540.00
273 Nok alumunium standar 40 cm 18, swg 22 Lbr 65,630.00
274 Nok genteng beton Bh 45,940.00
275 Nok Samping Genteng Metal (setara Multi Roof) Bh 44,630.00
276 Nok Samping Genteng Metal (setara Sakura Roof) Bh 44,630.00
277 Policarbonate M² 144,380.00
278 Seng Fiberglass Lbr 72,190.00
279 Seng Fiberglass Laserlite Plus (uk. 180 x 86 x 0,9 cm) Lbr 98,440.00
280 Seng Gelombang Alluminium 0,25 mm Lbr 63,000.00
281 Seng Gelombang Alluminium 0,30 mm Lbr 73,500.00
282 Seng Gelombang BJLS 20 Lbr 49,880.00
283 Seng Gelombang BJLS 24 Lbr 65,630.00
284 Seng Gelombang BJLS 25 Lbr 75,480.00
285 Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) Lbr 85,310.00
286 Seng Plat BJLS 20 Lbr 49,230.00
287 Seng Plat BJLS 25 Lbr 68,250.00
288 Seng Plat BJLS 30 (uk. 91,4 x 182,9 cm) Lbr 76,790.00
289 Seng Plat Alluminium 0,25 mm Lbr 55,130.00
290 Seng Plat Alluminium 0,30 mm Lbr 68,250.00
291 Internal cove artistik (5 x5x20) cm Bh 6,560.00
292 Marmer Bh 393,750.00
293 Plint keramik arttistik uk. 10 x 10 cm Bh 3,940.00
294 Plint keramik arttistik uk. 10 x 20 cm Bh 4,260.00
295 Shower Screen Aluminium Bh 3,281,250.00
296 Tegel Abu-Abu uk. 20x20 cm Bh 2,630.00
297 Tegel Abu-Abu uk. 30x30 cm Bh 6,100.00
298 Tegel Abu-Abu uk. 40x40 cm Bh 12,360.00
299 Tegel Berwarna uk. 20x20 cm Bh 2,950.00
300 Tegel Berwarna uk. 30x30 cm Bh 6,560.00
301 Tegel Berwarna uk. 40x40 cm Bh 10,940.00
302 Tegel Esenza uk. 40x40 cm Bh 91,880.00
303 Tegel granite dinding 20 x 20 Bh 39,380.00
304 Tegel granite dinding 25 x 50 Bh -
305 Tegel granite dinding 25 x 60 Bh 78,750.00
306 Tegel granite dinding 30 x 30 Bh 131,250.00
307 Tegel granite dinding 30 x 60 Bh 149,630.00
308 Tegel granite lantai 20 x 20 Bh 65,630.00
309 Tegel granite lantai 30 x 30 Bh 95,160.00
310 Tegel granite lantai 40 x 40 Bh 106,310.00
311 Tegel granite lantai 50 x 50 Bh 131,250.00
312 Tegel granite lantai 60 x 60 Bh 196,880.00
313 Tegel granite lantai 80 x 80 Bh 370,790.00
314 Tegel Granito uk. 30x30 cm Bh 39,380.00
315 Tegel Granito uk. 40x40 cm Bh 65,630.00
316 Tegel Keramik uk. 10x20 cm Bh 1,640.00
317 Tegel Keramik uk. 10x33 cm Bh 2,890.00
318 Tegel Keramik uk. 11x11 cm Bh 1,450.00
319 Tegel Keramik uk. 15x15 cm Bh 2,360.00
320 Tegel Keramik uk. 15x20 cm Bh 2,630.00
321 Tegel Keramik uk. 20x20 cm Bh 2,950.00
322 Tegel Keramik uk. 20x25 cm Bh 3,290.00

Halaman 7 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
323 Tegel Keramik uk. 25x25 cm Bh 5,210.00
324 Tegel Keramik uk. 30x30 cm Bh 5,500.00
325 Tegel Keramik uk. 30x30 cm antislip Bh 8,540.00
326 Tegel Keramik uk. 33x33 cm Bh 11,690.00
327 Tegel Keramik uk. 33x33 cm anti slip Bh 11,430.00
328 Tegel Keramik uk. 40x40 cm anti slip Bh 17,080.00
329 Tegel mosaik 30 x 30 cm, ex lokal Bh 62,350.00
330 Tegel Plint granito uk. 10x30 cm Bh 39,380.00
331 Tegel Plint granito uk. 10x40 cm Bh 44,630.00
332 Tegel Plint granito uk. 15x30 cm Bh 42,000.00
333 Tegel Plint pc abu-abu uk. 15x30 cm Bh 2,300.00
334 Tegel Plint pc abu-abu uk. 10x30 cm Bh 1,980.00
335 Tegel Plint pc abu-abu uk. 10x40 cm Bh 2,100.00
336 Tegel Plint pc warna uk. 10x40 cm Bh 2,360.00
337 Tegel Plint teralux kerang uk. 10x30 cm Bh 40,690.00
338 Tegel Plint teralux kerang uk. 10x40 cm Bh 40,690.00
339 Tegel Plint teralux kerang uk. 15x30 cm Bh 43,310.00
340 Tegel Plint teralux marmer uk. 10x30 cm Bh 45,940.00
341 Tegel Plint teralux marmer uk. 10x40 cm Bh 47,250.00
342 Tegel Plint teralux marmer uk. 10x60 cm Bh 49,230.00
343 Tegel Plint Teraso uk. 10x30 cm Bh 7,880.00
344 Tegel Plint Teraso uk. 10x40 cm Bh 8,540.00
345 Tegel Plint Teraso uk. 15x30 cm Bh 5,910.00
346 Tegel Plint warna uk. 10x20 cm Bh 2,950.00
347 Tegel Porselin putih uk. 11x11 cm Bh 1,110.00
348 Tegel Porselin putih uk. 15x15 cm Bh 1,850.00
349 Tegel Porselin putih uk. 20x20 cm Bh 4,200.00
350 Tegel Porselin warna uk. 10x20 cm Bh 2,100.00
351 Tegel Porselin warna uk. 11x11 cm Bh 1,710.00
352 Tegel Porselin warna uk. 15x15 cm Bh 2,240.00
353 Tegel Porselin warna uk. 20x20 cm Bh 3,940.00
354 Tegel teralux kerang uk. 30 x 30 cm Bh 36,750.00
355 Tegel teralux kerang uk. 40 x 40 cm Bh 55,130.00
356 Tegel teralux marmer uk. 40 x 40 cm Bh 111,560.00
357 Tegel teralux marmer uk. 60 x 60 cm Bh 196,880.00
358 Tegel Teraso uk. 30x30 cm Bh 7,230.00
359 Tegel Teraso uk. 40x40 cm Bh 13,400.00
360 Tegel Wafel uk. 20x20 cm Bh 2,160.00
361 Teraso cor M³ 1,050,000.00
362 Ubin keramik arttistik uk. 10 x 10 cm Bh 4,600.00
363 Ubin keramik arttistik uk. 10 x 20 cm Bh 9,190.00
364 Ubin keramik arttistik uk. 15 x 15 cm Bh 10,340.00
365 Ubin keramik arttistik uk. 5 x 20 cm Bh 4,600.00
366 Ubin tahan asam M² 85,310.00
367 Bak Cuci Stainless Steel (1 Lobang) Bh 328,130.00
368 Bak Cuci Stainless Steel (2 Lobang) Bh 590,630.00
369 Bak Mandi Fiberglass Bh 656,250.00
370 Bathub Bh 3,937,500.00
371 Biofill BF 8 Bh 12,206,250.00
372 Floor Drain Bh 26,250.00
373 Jet Pump Grundfos; Head 50 m; kap. 72 l/dt Unit 3,937,500.00
374 Jet Pump; Head 30 m; kap. 30 l/dt Unit 1,968,750.00
375 Kitchen Set M¹ 1,968,750.00
376 Kloset Duduk Keramik Standar Bh 1,115,630.00
377 Kloset Jongkok Keramik Standar Bh 229,690.00

Halaman 8 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
378 Kloset Monoblok Lokal Bh 1,246,880.00
379 Mata Kran Standar 1/2" Bh 73,750.00
380 Mata Kran Standar 3/4" Bh 123,310.00
381 Mata Kucing buah 98,440.00
382 PCI Girder L=17m Buah 169,312,500.00
383 PCI Girder L=21m Buah 190,968,750.00
384 PCI Girder L=26m Buah 244,125,000.00
385 PCI Girder L=32m Buah 309,093,750.00
386 PCI Girder L=36m Buah 330,750,000.00
387 PCI Girder L=41m Buah 378,000,000.00
388 Pelat Rambu (Eng. Grade) BH 207,640.00
389 Pelat Rambu (High I. Grade) BH 265,390.00
390 Pemantul Cahaya (Reflector) Bh. 16,540.00
391 Pipa Baja Kg 21,660.00
392 Pipa Galvanis (medium A) dia. 1" M¹ 45,940.00
393 Pipa Galvanis (medium A) dia. 1/2" M¹ 26,250.00
394 Pipa Galvanis (medium A) dia. 2" M¹ 88,600.00
395 Pipa Galvanis (medium A) dia. 3" M¹ 147,660.00
396 Pipa Galvanis (medium A) dia. 3/4" M¹ 36,100.00
397 Pipa Galvanis (medium B) dia. 1" M¹ 19,690.00
398 Pipa Galvanis (medium B) dia. 1/2" M¹ 11,810.00
399 Pipa Galvanis (medium B) dia. 2" M¹ 112,040.00
400 Pipa Galvanis (medium B) dia. 3" M¹ 72,190.00
401 Pipa Galvanis (medium B) dia. 3/4" M¹ 16,410.00
402 Pipa Galvanis Light (biasa) dia. 1" M¹ 19,690.00
403 Pipa Galvanis Light (biasa) dia. 1/2" M¹ 9,850.00
404 Pipa Galvanis Light (biasa) dia. 2" M¹ 31,250.00
405 Pipa Galvanis Light (biasa) dia. 3" M¹ 68,910.00
406 Pipa Galvanis Light (biasa) dia. 3/4" M¹ 13,130.00
407 Pipa Polyethylene (PE) dia. 1" M¹ 15,750.00
408 Pipa Polyethylene (PE) dia. 3/4" M¹ 11,160.00
409 Pipa Polyteline PE dia. 1 1/2" M¹ 32,810.00
410 Pipa Porous M¹ 42,930.00
411 Pipa PVC dia. 1" AW M¹ 7,880.00
412 Pipa PVC dia. 1,5" AW M¹ 13,130.00
413 Pipa PVC dia. 2" AW M¹ 19,690.00
414 Pipa PVC (S-10) dia. 1" D M¹ 8,540.00
415 Pipa PVC (S-10) dia. 1,5" D M¹ 10,830.00
416 Pipa PVC (S-10) dia. 2" D M¹ 12,300.00
417 Pipa PVC (S-10) dia. 3" D M¹ 22,310.00
418 Pipa PVC (S-10) dia. 3/4" D M¹ 6,090.00
419 Pipa PVC (S-10) dia. 4" D M¹ 32,810.00
420 Pipa PVC (S-12,5) dia. 1/2" AW M¹ 5,410.00
421 Pipa PVC (S-12,5) dia. 3/4" AW M¹ 6,560.00
422 Pipa PVC dia. 1 1/4" AW M¹ 10,500.00
423 Pipa PVC dia. 1/2" AW M¹ 5,250.00
424 Pipa PVC dia. 3" AW M¹ 32,810.00
425 Pipa PVC dia. 3/4" AW M¹ 5,910.00
426 Pipa PVC dia. 4" AW M¹ 55,130.00
427 Pompa Air Listrik; Suction 9 m; Head 40 m; kap. 35 l/min Unit 590,630.00
428 Pompa Centrifugal; Head 100 m; kap. 11 l/dt Unit 14,437,500.00
429 Pompa Tangan Dragon Unit 360,940.00
430 Profil Tank Fiberglass orange kap. 1100 ltr. Bh 1,968,750.00
431 Profil Tank Fiberglass orange kap. 650 ltr. Bh 1,282,980.00
432 Shower Screen Fiber Bh 3,281,250.00

Halaman 9 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
433 Shower Screen Kaca Bh 4,593,750.00
434 Stop Kran 1" Bh 98,440.00
435 Stop Kran 1/2" Bh 45,940.00
436 Stop Kran 2" Bh 203,640.00
437 Stop Kran 3/4" Bh 78,750.00
438 Submersible Deep Well Pump; Head 100 m; kap.1 HP Unit 6,890,630.00
439 Submersible Deep Well Pump; Head 70 m; kap.2 HP Unit 5,250,000.00
440 Urinoir Keramik Standar Bh 1,799,440.00
441 Wastafel Gantung Keramik Bh 725,130.00
442 Box MCB Unit 45,940.00
443 Down Light Warna 3" Bh 46,760.00
444 Down Light Warna 4" Bh 61,530.00
445 Down Light Warna 5" Bh 75,480.00
446 Down Light Warna 6" Bh 164,060.00
447 Exhaust Bh 459,380.00
448 Fetting Bh 9,850.00
449 Genset 1300 W Bh 2,100,000.00
450 Genset 2000 W Bh 2,625,000.00
451 Genset 2500 W Bh 3,806,250.00
452 Genset 5000 W Bh 7,875,000.00
453 Genset 6000 W Bh 8,531,250.00
454 Genset 900 W Bh 1,181,250.00
455 Kabel Ravo 2x1,5 mm2 M¹ 9,850.00
456 Kabel Ravo 2x2,5 mm2 M¹ 11,160.00
457 Lampu Downlight 4' Bh 78,750.00
458 Lampu Neon SL 15 Watt Bh 39,380.00
459 Lampu Neon SL 18 Watt Bh 42,660.00
460 Lampu Pijar 100 Watt Bh 10,500.00
461 Lampu Pijar 25 Watt Bh 6,560.00
462 Lampu Pijar 40 Watt Bh 7,880.00
463 Lampu Pijar 60 Watt Bh 9,850.00
464 Lampu TL (Neon) 10 Watt (komplet) Bh 59,060.00
465 Lampu TL (Neon) 20 Watt (komplet) Bh 98,440.00
466 Lampu TL (Neon) 40 Watt (komplet) Bh 114,850.00
467 Main Distribusi Panel (PDM) Unit 3,610.00
468 Saklar Ganda Bh 26,250.00
469 Saklar Stopkontak Bh 32,810.00
470 Saklar Tunggal Bh 19,690.00
471 Sekring Automatik Bh 32,810.00
472 Stop Kontak Bh 19,690.00
473 Alumunium foil M² 65,630.00
474 Carpet M² 85,310.00
475 Carpet 80% wool, 20% nylon M² 105,000.00
476 Feltex carpet 100% wool T-21 M² 216,560.00
477 Floor hardener Kg 36,100.00
478 Gymfloor M² 157,500.00
479 Lem vinyil Kg 36,100.00
480 Lt vinyl karet 30x30 kwl II M² 111,560.00
481 Lt vinyl karet 30x30 kwl l M² 105,000.00
482 Parquet jati M² 236,250.00
483 Underlyer tebal 6 mm/rubber corrugated M² 223,130.00
484 Vinyil Lbr 36,100.00
485 Vinyil asbes Bh 16,410.00
486 Vinyil motif kembang Ex DN Bh 22,980.00
487 Vinyil wall covering lebar 50 cm M² 131,250.00

Halaman 10 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
488 Wallpaper M² 150,940.00
489 Jendela besi M² 984,380.00
490 Jendela besi tahan api M² 1,181,250.00
491 Kaca Buram 12 mm M² 393,750.00
492 Kaca Buram 5 mm M² 229,690.00
493 Kaca cermin tebal 5 mm M² 210,000.00
494 Kaca cermin tebal 8 mm M² 262,500.00
495 Kaca patri M² 393,750.00
496 Kaca Polos 3 mm M² 131,250.00
497 Kaca Polos 5 mm M² 203,440.00
498 Kaca Polos 8 mm M² 210,000.00
499 Kaca Ray-Band 5 mm M² 210,000.00
500 Kaca wireglass M² 196,880.00

Halaman 11 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
501 Kawat burung M² 22,980.00
502 Kawat Harmonika M² 41,010.00
503 Kawat Nyamuk/Kasa Logam M² 24,610.00
504 Kawat Nyamuk/Kasa Plastik M² 19,690.00
505 Naco (Kerangka dan Daun) M² 525,000.00
506 Pintu besi baja M² 459,380.00
507 Pintu lipat M² 984,380.00
508 Plastik Filter M² 13,130.00
509 Sunscreen alumunium M² 164,060.00
510 Door closer Bh 984,380.00
511 Door holder Bh 328,130.00
512 Door Stop Bh 65,630.00
513 Engsel (setara solid) 3" Bh 26,250.00
514 Engsel (setara solid) 4" Bh 45,940.00
515 Engsel Biasa 2 1/2" Bh 9,850.00
516 Engsel Biasa 3" Bh 13,130.00
517 Engsel Lokal Besar Bh 32,810.00
518 Engsel Nylon Arch 3" Bh 15,980.00
519 Espagnolet Set 196,880.00
520 Formica Lbr 91,880.00
521 Grendel (setara solid) Bh 29,540.00
522 Grendel Lokal Besar Bh 22,980.00
523 Hak Angin Biasa Bh 6,560.00
524 Kait angin Bh 22,980.00
525 Kosen + Pintu PVC Bh 459,380.00
526 Kunci lemari Bh 32,810.00
527 Kunci Pintu Master (setara solid) Bh 295,310.00
528 Kunci Selot Bh 39,380.00
529 Kunci Silinder Putar Bh 98,440.00
530 Kunci Tanam 2 Slag Bh 190,310.00
531 Kunci Tanam 3 Slag Bh 262,500.00
532 Kunci Tanam Biasa Bh 98,440.00
533 Pegangan pintu biasa Bh 65,630.00
534 Pintu alumunium M² 360,940.00
535 Rol pintu dorong Bh 105,000.00
536 Sealent Kg 110,250.00
537 Tarikan Pintu (setara solid) 10" Psg 150,940.00
538 Tarikan Pintu (setara solid) 15" Psg 328,130.00
539 Tarikan Pintu (setara solid) 20" Psg 525,000.00
540 Venetion blinds M² 78,750.00
541 Bambu / Dolken Btg 16,410.00
542 Gypsum 12 mm Lbr 131,250.00
543 Gypsum 9 mm Lbr 78,750.00
544 Kayu Profil 3/3 Ujg 14,440.00
545 Kayu Profil 3/8 Ujg 15,750.00
546 List Profil M' 6,560.00
547 List Profil Gypsum M' 32,810.00
548 Lumbressering Ujg 22,980.00
549 Metal Furing (Rangka Plafond) Ujg 39,380.00
550 Multipleks 12 mm Lbr 238,230.00
551 Multipleks 4 mm Lbr 72,190.00
552 Multipleks 6 mm Lbr 105,000.00
553 Multipleks 9 mm Lbr 144,380.00
554 Plywood 3 mm Lbr 101,730.00

Halaman 12 dari 127 halaman


SATUAN HARGA KET
NO. JENIS BAHAN
(Rp.)
555 Plywood 4 mm Lbr 111,560.00
556 Plywood 6 mm Lbr 118,130.00
557 Softboard Lbr 78,750.00
558 Teakwood 3x7 Lbr 118,130.00
559 Teakwood 4x8 Lbr 131,250.00
560 Tripleks 3 mm Lbr 59,060.00
561 Tripleks 4 mm Lbr 75,480.00
562 Tripleks 6 mm Lbr 101,730.00
563 Glass Bit Kg 46,200.00
564 Lem Kayu Kg 45,940.00
565 Sabun Kg 19,690.00
566 Perlengkapan Ls

Catatan :
- Sesuai harga yang berlaku dipasaran.
- Harga satuan belum termasuk pajak yang berlaku.
- Harga sewaktu-waktu bisa berubah

Menyetujui,
a.n. KEPALA DINAS PEKERJAAN UMUM KONSULTAN
KOTA MANADO PT. MEDALION ESA PERKASINDO
SEKRETARIS

ROYKE F. MAMAHIT, ST., MT. MEITA M. M. TUMEWU, ST


NIP. 19730630 200003 1 007 Direktur

Halaman 13 dari 127 halaman


code HARGA DOMINAN HARGA PROP
USULAN
HARGA UNTUK KOTA SUMBER
HARGA HARGA HARGA RATA Harga Hasil Harga Deviasi HARGA UNTUK 2015 JEMBATAN BERCAHAYA
Digunakan Ket, Harga % Deviasi TAMBAHAN / MANADO UD. PERINTIS ANEKA JAYA KERAMIK INTI MURNI
NO. JENIS BAHAN SATUAN TERENDAH TERTINGGI RATA Analisa (+/-) BAHAN 2014 KE ASET, LIMA TIMUR
PENYESUAIAN 2015 Triwulan JAYA
MAX
1
(Rp.) Freq. Jlh Data
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 17 14 15 16 7 8 9 10 11 12
1 Agregat Base Kelas A a M³ Tidak Ada - 3 110,000.00 110,000.00 110,000.00 110,000.00 333,930.00 H-14 0% 0.00 333,930.00 333,930.00 417,410.00 - - - - - -
2 Agregat Base Kelas B a M³ Tidak Ada - 3 100,000.00 100,000.00 100,000.00 100,000.00 266,220.00 H-14 0% 0.00 266,220.00 266,220.00 332,780.00 - - - - - -
3 Agregat Base Kelas C a M³ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 285,940.00 H-14 0% 0.00 285,940.00 285,940.00 357,430.00 - - - - - -
4 Agregat Halus a M³ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 289,790.00 H-14 0% 0.00 289,790.00 289,790.00 362,240.00 - - - - - -
5 Agregat Kasar a M³ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 289,790.00 H-14 0% 0.00 289,790.00 289,790.00 362,240.00 - - - - - -
6 Air a Ltr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 150.00 0.00 13% 20.00 200.00 130.00 160.00 - - - - - -
7 Alang-alang a Ikat Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 30,000.00 Penyesuaian 13% 3,750.00 30,000.00 26,250.00 32,810.00 - - - - - -
8 Aspal a Kg 12,000.00 2 3 11,130.00 11,130.00 11,130.00 12,000.00 11,130.00 H-Rata rata -8% -870.00 11,130.00 12,000.00 12,000.00 - - - - - -
9 Aspal Hotmix (Ready Mix) a Ton Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,500,000.00 Penyesuaian 9% 135,000.00 1,500,000.00 1,365,000.00 1,706,250.00 - - - - - -
10 Bata merah a Bh 800.00 3 8 800.00 1,000.00 883.33 800.00 850.00 Penyesuaian 7% 60.00 850.00 790.00 990.00 - - 1,000.00 - - -
11 Batako Uk. 20 x 40 x 10 a Bh Tidak Ada - 4 3,000.00 3,800.00 3,400.00 3,400.00 2,365.00 0.00 11% 265.00 2,100.00 2,630.00 - - - - - -
12 Batu Alam 10 x 20 a M² Tidak Ada - 4 120,000.00 150,000.00 135,000.00 135,000.00 135,000.00 H-Rata rata 11% 14,250.00 120,750.00 150,940.00 - - - - - -
13 Batu apung a Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 7,090.00 0.00 11% 790.00 6,300.00 7,880.00 - - - - - -
14 Batu Bata Klinker Uk. 5 x 5 x 25 a Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,780.00 0.00 11% 200.00 1,580.00 1,980.00 - - - - - -
15 Batu Belah / Batu Kali / Batu Gunung a M³ 137,500.00 2 7 500.00 143,750.00 107,850.00 137,500.00 235,200.00 H-14 0% 0.00 235,200.00 235,200.00 294,000.00 - - - - - -
16 Batu Belah Uk. 15 - 20 a M³ Tidak Ada - 3 240,000.00 240,000.00 240,000.00 240,000.00 240,000.00 H-Rata rata 17% 41,550.00 198,450.00 248,060.00 - - - - - -
17 Batu Boulder a M³ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 350,000.00 Penyesuaian 40% 140,000.00 350,000.00 210,000.00 262,500.00 - - - - - -
18 Batu Bunga (Alam) a M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 147,655.00 0.00 11% 16,405.00 131,250.00 164,060.00 - - - - - -
19 Batu Candi 10 x 20 a M² Tidak Ada - 4 145,000.00 150,000.00 147,500.00 147,500.00 147,500.00 H-Rata rata 0% 500.00 147,000.00 183,750.00 - - - - - -
20 Batu Candi 30 x 30 a M² Tidak Ada - 3 150,000.00 150,000.00 150,000.00 150,000.00 179,025.00 Penyesuaian 9% 16,275.00 179,025.00 162,750.00 203,440.00 - - - - - -
21 Batu Green Bally 15 x 30 a M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 218,530.00 0.00 11% 24,280.00 194,250.00 242,810.00 - - - - - -
22 Batu Green Bally 20 x 40 a M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 218,530.00 0.00 11% 24,280.00 194,250.00 242,810.00 - - - - - -
23 Batu Palimanan 10 x 20 a M² Tidak Ada - 4 135,000.00 145,000.00 140,000.00 140,000.00 167,475.00 Penyesuaian 9% 15,225.00 167,475.00 152,250.00 190,310.00 - - - - - -
24 Batu Palimanan 15 x 30 a M² Tidak Ada - 4 150,000.00 155,000.00 152,500.00 152,500.00 190,575.00 Penyesuaian 9% 17,325.00 190,575.00 173,250.00 216,560.00 - - - - - -
25 Batu Palimanan 20 x 40 a M² Tidak Ada - 4 160,000.00 175,000.00 167,500.00 167,500.00 196,350.00 Penyesuaian 9% 17,850.00 196,350.00 178,500.00 223,130.00 - - - - - -
26 Batu Palimanan 30 x 30 a M² Tidak Ada - 3 185,000.00 185,000.00 185,000.00 185,000.00 185,000.00 H-Rata rata 4% 6,500.00 178,500.00 223,130.00 - - - - - -
27 Batu Pecah Uk. 0,5 - 1 a M³ Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 375,000.00 Penyesuaian Tidak Ada Data #VALUE! 375,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
28 Batu Pecah Uk. 1 - 3 a M³ Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 337,500.00 Penyesuaian Tidak Ada Data #VALUE! 337,500.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
29 Batu Pecah Uk. 3 - 5 a M³ Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 312,500.00 Penyesuaian Tidak Ada Data #VALUE! 312,500.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
30 Batu Pecah Uk. 5 - 7 a M³ Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 287,500.00 Penyesuaian Tidak Ada Data #VALUE! 287,500.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
31 Batu Sukabumi 10 x 20 a M² Tidak Ada - 3 180,000.00 180,000.00 180,000.00 180,000.00 153,565.00 0.00 11% 17,065.00 136,500.00 170,630.00 - - - - - -
32 Batu Sukabumi 15 x 15 a M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 135,845.00 0.00 11% 15,095.00 120,750.00 150,940.00 - - - - - -
33 Bensin / Premium (HET) a Ltr Tidak Ada - 3 8,500.00 8,500.00 8,500.00 8,500.00 5,320.00 0.00 11% 590.00 4,730.00 5,910.00 - - - - - -
34 Bensin / Premium (Industri) a Ltr Tidak Ada - 3 11,800.00 11,800.00 11,800.00 11,800.00 11,800.00 H-Rata rata 12% 1,410.00 10,390.00 12,990.00 - - - - - -
35 Butonite Patch a Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 28,645.00 0.00 11% 3,185.00 25,460.00 31,830.00 - - - - - -
36 Cansteen a Bh Tidak Ada - 3 37,500.00 37,500.00 37,500.00 37,500.00 51,975.00 Penyesuaian 9% 4,725.00 51,975.00 47,250.00 59,060.00 - - - - - -
37 Gebalan Rumput a M² 15,750.00 2 2 0.00 0.00 Tdk Ada Data 15,750.00 17,325.00 Penyesuaian 9% 1,575.00 17,325.00 15,750.00 15,750.00 - - - - - -
38 Geotextile a M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 7,685.00 0.00 11% 855.00 6,830.00 8,540.00 - - - - - -
39 Hollow Brick a Bh Tidak Ada - 7 2,400.00 3,800.00 3,060.00 3,060.00 4,048.00 Penyesuaian 9% 368.00 4,048.00 3,680.00 4,600.00 - - - - - -
40 Ijuk a Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 14,770.00 0.00 11% 1,640.00 13,130.00 16,410.00 - - - - - -
41 Kapur Padam a M³ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 88,595.00 0.00 11% 9,845.00 78,750.00 98,440.00 - - - - - -
42 Kapur sirih a Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,070.00 0.00 11% 120.00 950.00 1,190.00 - - - - - -
43 Karet Elastomer a Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 767,815.00 0.00 11% 85,315.00 682,500.00 853,130.00 - - - - - -
44 Kerikil Beton a M³ Tidak Ada - 8 350,000.00 1,300,000.00 941,666.67 941,666.67 326,015.00 0.00 11% 36,225.00 289,790.00 362,240.00 - - 525,000.00 - - -
45 Kerikil Koral Uk. 1 - 3 cm a M³ Tidak Ada - 5 350,000.00 1,200,000.00 883,333.33 883,333.33 326,015.00 0.00 11% 36,225.00 289,790.00 362,240.00 - - - - - -
46 Koral Sikat 2 - 3 cm a Kg Tidak Ada - 3 1,200,000.00 1,200,000.00 1,200,000.00 1,200,000.00 11,815.00 0.00 11% 1,315.00 10,500.00 13,130.00 - - - - - -
47 Koral Sikat Panca Warna a Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 8,865.00 0.00 11% 985.00 7,880.00 9,850.00 - - - - - -
48 Minyak Bekisting a Ltr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 12,410.00 0.00 11% 1,380.00 11,030.00 13,790.00 - - - - - -
49 Minyak Pelumas / Oli (Pertamina) a Ltr Tidak Ada - 3 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 H-Rata rata 11% 4,020.00 30,980.00 38,730.00 - - - - - -
50 Minyak Pelumas / Oli (Shell) a Ltr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 53,155.00 0.00 11% 5,905.00 47,250.00 59,060.00 - - - - - -
51 Minyak Tanah / Kerosine (Industri) a Ltr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 11,416.00 Penyesuaian 7% 756.00 11,416.00 10,660.00 13,330.00 - - - - - -
52 Pasir Kasar/ Urug a M³ 500,000.00 3 9 400,000.00 550,000.00 478,571.43 500,000.00 205,000.00 Penyesuaian 10% 19,670.00 205,000.00 185,330.00 231,660.00 - - - - - 500,000.00
53 Pasir Pasang / Beton a M³ 475,000.00 2 7 270,000.00 550,000.00 454,000.00 475,000.00 205,000.00 Penyesuaian 10% 19,670.00 205,000.00 185,330.00 231,660.00 - - 270,000.00 - - -
54 Pasir Pasang (Sedang) M³ Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 205,000.00 Penyesuaian Tidak Ada Data #VALUE! 205,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
55 Paving Stone t=6 cm a Bh Tidak Ada - 3 1,800.00 18,000.00 7,300.00 7,300.00 3,500.00 Penyesuaian Tidak Ada Data #VALUE! 3,500.00 Cek_Item Cek_Item - - - - - -
56 Paving Stone t=8 cm a Bh Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 4,000.00 Penyesuaian Tidak Ada Data #VALUE! 4,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
57 S o l a r (HET) a Ltr 6,500.00 2 3 7,500.00 7,500.00 7,500.00 6,500.00 6,500.00 H-Dominan 0% 0.00 6,500.00 6,500.00 - - - - - -
58 S o l a r (Industri) a Ltr 10,750.00 2 3 11,450.00 11,450.00 11,450.00 10,750.00 10,838.00 Penyesuaian 1% 88.00 10,838.00 10,750.00 10,750.00 - - - - - -
59 Semen PC a Kg 1,700.00 4 14 1,180.00 3,000.00 1,765.00 1,700.00 1,700.00 H-Dominan 26% 440.00 1,260.00 1,580.00 - - - - 1,600.00 -
60 Semen Putih a Kg 5,000.00 5 19 1,700.00 5,000.00 3,131.76 5,000.00 2,960.00 0.00 11% 330.00 2,630.00 3,290.00 2,340.00 2,500.00 4,000.00 5,000.00 2,400.00 2,000.00
61 Semen Warna a Kg 12,000.00 3 15 10,000.00 45,000.00 16,769.23 12,000.00 13,860.00 Penyesuaian 9% 1,260.00 13,860.00 12,600.00 15,750.00 12,500.00 - 15,000.00 12,000.00 35,000.00
62 Sirtu Alam a M³ Tidak Ada - 3 450,000.00 450,000.00 450,000.00 450,000.00 151,435.00 0.00 11% 16,825.00 134,610.00 168,260.00 - - - - - -
63 Storox-100 a Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 59,065.00 0.00 11% 6,565.00 52,500.00 65,630.00 - - - - - -
64 Tanah Biasa a M³ 200,000.00 2 5 150,000.00 200,000.00 183,333.33 200,000.00 64,330.00 0.00 11% 7,150.00 57,180.00 71,480.00 - - - - - -
65 Tanah Liat a M³ Tidak Ada - 4 150,000.00 200,000.00 175,000.00 175,000.00 59,065.00 0.00 11% 6,565.00 52,500.00 65,630.00 - - - - - -
66 Tanah Pilihan a M³ Tidak Ada - 4 150,000.00 200,000.00 175,000.00 175,000.00 80,405.00 0.00 11% 8,935.00 71,470.00 89,340.00 - - - - - -
67 Trihex Paving a Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 3,545.00 0.00 11% 395.00 3,150.00 3,940.00 - - - - - -
68 Besi Hollow 2 x 4 cm bs M¹ 20,000.00 2 14 18,000.00 102,000.00 52,416.67 20,000.00 20,000.00 H-Dominan -154% -30,820.00 50,820.00 63,530.00 102,000.00 90,000.00 - - - -
69 Besi Hollow 4 x 4 cm bs M¹ Tidak Ada - 15 24,000.00 150,000.00 78,615.38 78,615.38 78,615.38 H-Rata rata 14% 11,195.38 67,420.00 84,280.00 138,000.00 140,000.00 - - 105,000.00 -
70 Besi Profil bs Kg Tidak Ada - 3 12,000.00 12,000.00 12,000.00 12,000.00 20,218.00 Penyesuaian 9% 1,838.00 20,218.00 18,380.00 22,980.00 - - - - - -
71 Besi Siku 3 x 3 x 2 bs M¹ Tidak Ada - 6 30,500.00 60,000.00 44,375.00 44,375.00 44,375.00 H-Rata rata 5% 2,375.00 42,000.00 52,500.00 - 47,000.00 - - - -
72 Besi Siku 3 x 3 x 3 bs M¹ 65,000.00 2 10 45,000.00 70,000.00 59,000.00 65,000.00 65,000.00 H-Dominan 7% 4,620.00 60,380.00 75,480.00 65,000.00 - 45,000.00 - 50,000.00 -
73 Besi Siku 4 x 4 x 3 bs M¹ 75,000.00 2 9 40,000.00 110,000.00 68,285.71 75,000.00 75,000.00 H-Dominan 9% 6,750.00 68,250.00 85,310.00 - 40,000.00 - - 72,500.00 -
74 Besi Siku 4 x 4 x 4 bs M¹ 110,000.00 2 10 40,000.00 120,000.00 90,875.00 110,000.00 110,000.00 H-Dominan 12% 12,870.00 97,130.00 121,410.00 105,000.00 40,000.00 65,000.00 - 90,000.00 -
75 Besi Siku 5 x 5 x 5 bs M¹ 195,000.00 2 10 97,500.00 195,000.00 167,000.00 195,000.00 195,000.00 H-Dominan 20% 38,860.00 156,140.00 195,180.00 195,000.00 175,000.00 97,500.00 - 155,000.00 -
76 Besi Stainlessteel 1/2" bs M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 91,555.00 0.00 11% 10,175.00 81,380.00 101,730.00 - - - - - -
77 Besi Stainlessteel 3/4" bs M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 112,220.00 0.00 11% 12,470.00 99,750.00 124,690.00 - - - - - -
78 Besi Stainlessteel 1" bs M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 129,940.00 0.00 11% 14,440.00 115,500.00 144,380.00 - - - - - -
79 Besi Stainlessteel 1 1/4" bs M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 135,845.00 0.00 11% 15,095.00 120,750.00 150,940.00 - - - - - -
80 Besi Stainlessteel 1 1/2" bs M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 141,750.00 0.00 11% 15,750.00 126,000.00 157,500.00 - - - - - -
81 Besi Stainlessteel 2" bs M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 165,285.00 0.00 11% 18,365.00 146,920.00 183,650.00 - - - - - -
82 Besi Stainlessteel 3" bs M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 141,750.00 0.00 11% 15,750.00 126,000.00 157,500.00 - - - - - -
83 Besi Stainlessteel 4" bs M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 283,500.00 0.00 11% 31,500.00 252,000.00 315,000.00 - - - - - -
84 Besi strip bs Kg Tidak Ada - 3 9,750.00 9,750.00 9,750.00 9,750.00 92,400.00 H-14 0% 0.00 92,400.00 92,400.00 115,500.00 - - - - - -
85 Besi Warmesh θ 10 bs Unit Tidak Ada - 5 65,000.00 1,075,000.00 711,666.67 711,666.67 1,126,125.00 Penyesuaian 9% 102,375.00 1,126,125.00 1,023,750.00 1,279,690.00 1,075,000.00 65,000.00 - - - -
86 Besi Warmesh θ 6 bs Unit Tidak Ada - 7 28,000.00 385,000.00 294,600.00 294,600.00 410,025.00 Penyesuaian 9% 37,275.00 410,025.00 372,750.00 465,940.00 380,000.00 28,000.00 - - - -
87 Besi Warmesh θ 8 bs Unit 650,000.00 2 7 39,000.00 650,000.00 514,800.00 650,000.00 650,000.00 H-Dominan 6% 35,750.00 614,250.00 767,810.00 645,000.00 39,000.00 - - - -
88 Bois Beton dia. 100 cm (pakai tulangan) bs Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 330,750.00 0.00 11% 36,750.00 294,000.00 367,500.00 - - - - - -
89 Bois Beton dia. 100 cm (tanpa tulangan) bs Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 236,250.00 0.00 11% 26,250.00 210,000.00 262,500.00 - - - - - -
90 Bois Beton dia. 150 cm (pakai tulangan) bs Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 413,440.00 0.00 11% 45,940.00 367,500.00 459,380.00 - - - - - -
91 Bois Beton dia. 150 cm (tanpa tulangan) bs Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 271,690.00 0.00 11% 30,190.00 241,500.00 301,880.00 - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 17 14 15 16 7 8 9 10 11 12
92 Bois Beton dia. 60 cm (pakai tulangan) bs Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 236,250.00 0.00 11% 26,250.00 210,000.00 262,500.00 - - - - - -
93 Bois Beton dia. 60 cm (tanpa tulangan) bs Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 177,190.00 0.00 11% 19,690.00 157,500.00 196,880.00 - - - - - -
94 Bois Beton dia. 80 cm (pakai tulangan) bs Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 295,315.00 0.00 11% 32,815.00 262,500.00 328,130.00 - - - - - -
95 Bois Beton dia. 80 cm (tanpa tulangan) bs Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 189,000.00 0.00 11% 21,000.00 168,000.00 210,000.00 - - - - - -
96 Kawat baja bs Kg Tidak Ada - 4 20,000.00 25,000.00 22,500.00 22,500.00 34,650.00 Penyesuaian 9% 3,150.00 34,650.00 31,500.00 39,380.00 25,000.00 - - - - -
97 Kawat Beronjong bs Kg Tidak Ada - 6 12,000.00 27,500.00 21,125.00 21,125.00 21,125.00 H-Rata rata 11% 2,225.00 18,900.00 23,630.00 27,500.00 - - 25,000.00 - -
98 Kawat Beronjong (Jadi) dia. 2,7 mm ( 2 x 1 x 0,5 ) bs M³ Tidak Ada - 5 20,000.00 320,000.00 186,666.67 186,666.67 436,975.00 Penyesuaian 9% 39,725.00 436,975.00 397,250.00 496,560.00 - - - - - -
99 Kawat Beronjong (Jadi) dia. 2,7 mm ( 3 x 1 x 0,5 ) bs M³ Tidak Ada - 4 20,000.00 310,000.00 165,000.00 165,000.00 600,600.00 Penyesuaian 9% 54,600.00 600,600.00 546,000.00 682,500.00 - - - - - -
100 Kawat Beronjong (Jadi) dia. 3,0 mm ( 2 x 1 x 0,5 ) bs M³ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 496,125.00 0.00 11% 55,125.00 441,000.00 551,250.00 - - - - - -
101 Kawat Beronjong (Jadi) dia. 3,0 mm ( 3 x 1 x 0,5 ) bs M³ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 744,190.00 0.00 11% 82,690.00 661,500.00 826,880.00 - - - - - -
102 Kawat Beton / Bendrat bs Kg 20,000.00 6 13 18,000.00 170,000.00 42,636.36 20,000.00 23,100.00 Penyesuaian 9% 2,100.00 23,100.00 21,000.00 26,250.00 20,000.00 - 22,500.00 20,000.00 - -
103 Kawat Duri bs Kg 65,000.00 3 11 52,500.00 70,000.00 63,888.89 65,000.00 23,625.00 0.00 11% 2,625.00 21,000.00 26,250.00 65,000.00 - 65,000.00 70,000.00 60,000.00 -
104 Kawat jaring galvanis bs M¹ Tidak Ada - 3 25,000.00 25,000.00 25,000.00 25,000.00 46,200.00 Penyesuaian 9% 4,200.00 46,200.00 42,000.00 52,500.00 - - - - - -
105 Kawat Las bs Kg 35,000.00 3 12 25,000.00 145,000.00 42,950.00 35,000.00 29,530.00 0.00 11% 3,280.00 26,250.00 32,810.00 28,500.00 - 32,500.00 25,000.00 145,000.00 -
106 Pagar BRC (BRC Fence) ; tinggi = 120 cm bs M¹ Tidak Ada - 5 257,000.00 300,000.00 275,666.67 275,666.67 693,000.00 Penyesuaian 9% 63,000.00 693,000.00 630,000.00 787,500.00 270,000.00 - - - - -
107 Pagar BRC (BRC Fence) ; tinggi = 175 cm bs M¹ Tidak Ada - 5 414,500.00 500,000.00 444,833.33 444,833.33 750,750.00 Penyesuaian 9% 68,250.00 750,750.00 682,500.00 853,130.00 420,000.00 - - - - -
108 Pagar BRC (BRC Fence) ; tinggi = 90 cm bs M¹ Tidak Ada - 4 235,000.00 250,000.00 242,500.00 242,500.00 577,500.00 Penyesuaian 9% 52,500.00 577,500.00 525,000.00 656,250.00 235,000.00 - - - - -
109 Paku Asbes Bh bs Bh 25,000.00 2 5 12,000.00 25,000.00 20,666.67 25,000.00 1,000.00 0.00 11% 110.00 890.00 1,110.00 25,000.00 - - - - -
110 Paku Beton bs Kg 25,000.00 4 17 10,000.00 40,000.00 20,800.00 25,000.00 25,000.00 H-Dominan -5% -1,250.00 28,875.00 26,250.00 32,810.00 13,500.00 - 15,000.00 25,000.00 37,500.00 -
111 Paku Genteng Metal bs Kg 25,000.00 3 12 15,000.00 37,000.00 26,950.00 25,000.00 25,000.00 H-Dominan -26% -6,500.00 34,650.00 31,500.00 39,380.00 25,000.00 - - - 27,500.00 -
112 Paku Kayu 2" s/d 6" bs Kg 15,000.00 6 16 14,000.00 17,500.00 15,250.00 15,000.00 20,000.00 0.00 8% 1,620.00 20,218.00 18,380.00 22,980.00 16,000.00 - 15,000.00 16,000.00 14,000.00 15,000.00
113 Paku pancing bs Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 20,000.00 0.00 -5% -1,000.00 21,000.00 26,250.00 - - - - - -
114 Paku Reng bs Kg Tidak Ada - 5 2,000.00 15,000.00 9,000.00 9,000.00 20,000.00 0.00 8% 1,620.00 20,218.00 18,380.00 22,980.00 - - - 2,000.00 - -
115 Paku Sekrup bs Kg Tidak Ada - 8 5,000.00 20,000.00 10,266.67 10,266.67 50,000.00 0.00 -16% -7,750.00 63,525.00 57,750.00 72,190.00 5,000.00 - - 12,000.00 - -
116 Paku Seng bs Kg 25,000.00 7 20 19,000.00 30,000.00 22,722.22 25,000.00 25,000.00 H-Dominan 8% 1,900.00 23,100.00 28,880.00 30,000.00 19,000.00 25,000.00 25,000.00 25,000.00 25,000.00
117 Paku Tripleks bs Kg 20,000.00 10 18 16,000.00 310,000.00 38,125.00 20,000.00 25,000.00 0.00 5% 1,370.00 25,993.00 23,630.00 29,540.00 20,000.00 19,000.00 20,000.00 20,000.00 20,000.00 -
118 Pintu gulung besi bs M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 885,940.00 0.00 11% 98,440.00 787,500.00 984,380.00 - - - - - -
119 Plat Rambu bs Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 238,735.00 0.00 11% 26,525.00 212,210.00 265,260.00 - - - - - -
120 Profil alumunium "T" bs M¹ Tidak Ada - 3 2,800,000.00 2,800,000.00 2,800,000.00 2,800,000.00 23,625.00 0.00 11% 2,625.00 21,000.00 26,250.00 - - - - - -
121 Rel Pengaman (Guard Rail) bs M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 153,565.00 0.00 11% 17,065.00 136,500.00 170,630.00 - - - - - -
122 Rolling Door bs M² Tidak Ada - 3 130,000.00 130,000.00 130,000.00 130,000.00 2,021,250.00 Penyesuaian 9% 183,750.00 2,021,250.00 1,837,500.00 2,296,880.00 130,000.00 - - - - -
123 Sekrup fixer bs Bh Tidak Ada - 5 500.00 10,000.00 6,500.00 6,500.00 235.00 0.00 11% 25.00 210.00 260.00 - - - - - -
124 Sekrup Galbani bs Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 710.00 0.00 11% 80.00 630.00 790.00 - - - - - -
125 Besi Beton Polos bt Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 11,700.00 0.00 11% 1,300.00 10,400.00 13,000.00 - - - - - -
126 Besi Beton Polos dia. 6 mm bt Ujung 30,000.00 4 17 22,000.00 31,000.00 26,966.67 30,000.00 34,650.00 Penyesuaian 9% 3,150.00 34,650.00 31,500.00 39,380.00 30,000.00 - 29,500.00 30,000.00 25,000.00 27,500.00
127 Besi Beton Polos dia. 10 mm bt Ujung 65,000.00 3 19 32,000.00 73,000.00 61,970.59 65,000.00 65,000.00 H-Dominan 3% 2,000.00 63,000.00 78,750.00 61,000.00 - 65,000.00 67,000.00 67,500.00 65,000.00
128 Besi Beton Polos dia. 12 mm bt Ujung 105,000.00 3 19 70,000.00 105,000.00 91,705.88 105,000.00 105,000.00 H-Dominan 20% 21,000.00 84,000.00 105,000.00 91,000.00 - 85,000.00 98,000.00 90,000.00 95,000.00
129 Besi Beton Polos dia. 14 mm bt Ujung 135,000.00 3 14 130,000.00 175,000.00 140,500.00 135,000.00 135,000.00 H-Dominan 3% 3,750.00 131,250.00 164,060.00 142,500.00 - - 145,000.00 140,000.00 130,000.00
130 Besi Beton Polos dia. 16 mm bt Ujung 175,000.00 3 14 27,500.00 180,000.00 157,083.33 175,000.00 175,000.00 H-Dominan 4% 7,000.00 168,000.00 210,000.00 175,000.00 - - 165,000.00 170,000.00 162,500.00
131 Besi Beton Ulir bt Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 12,815.00 0.00 11% 1,425.00 11,390.00 14,240.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
132 Besi Beton Ulir dia. 14 mm bt Ujung 135,000.00 2 6 105,000.00 155,000.00 132,500.00 135,000.00 135,000.00 H-Dominan 0% 70.00 134,930.00 168,660.00 - - - 155,000.00 - -
133 Besi Beton Ulir dia. 16 mm bt Ujung 175,000.00 3 10 161,000.00 176,000.00 170,750.00 175,000.00 175,000.00 H-Dominan 6% 9,800.00 165,200.00 206,500.00 175,000.00 - - 165,000.00 - -
134 Besi Beton Ulir dia. 18 mm bt Ujung Tidak Ada - 4 234,000.00 240,000.00 237,000.00 237,000.00 237,000.00 H-Rata rata 4% 8,560.00 228,440.00 285,550.00 240,000.00 - - - - -
135 Besi Beton Ulir dia. 20 mm bt Ujung Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 379,780.00 0.00 11% 42,200.00 337,580.00 421,980.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
136 Besi Beton Ulir dia. 22 mm bt Ujung Tidak Ada - 4 307,500.00 355,000.00 331,250.00 331,250.00 331,250.00 H-Rata rata 3% 11,130.00 320,120.00 400,150.00 355,000.00 - - - - -
137 Besi Beton Ulir dia. 24 mm bt Ujung Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 471,915.00 0.00 11% 52,435.00 419,480.00 524,350.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
138 Beton Roster Uk. 20x20 cm btn Bh Tidak Ada - 5 16,000.00 45,000.00 33,666.67 33,666.67 14,770.00 0.00 11% 1,640.00 13,130.00 16,410.00 - - - - - -
139 Beton Roster Uk. 20x40 cm btn Bh Tidak Ada - 4 58,000.00 75,000.00 66,500.00 66,500.00 17,720.00 0.00 11% 1,970.00 15,750.00 19,690.00 - - - - - -
140 Ijuk btn M³ Tidak Ada - 3 10,000.00 10,000.00 10,000.00 10,000.00 46,200.00 Penyesuaian 9% 4,200.00 46,200.00 42,000.00 52,500.00 - - - - - -
141 Residu btn Lt Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 38,395.00 0.00 11% 4,265.00 34,130.00 42,660.00 - - - - - -
142 Roster Kaca Uk. 20x20 cm btn Bh Tidak Ada - 8 20,000.00 35,000.00 23,916.67 23,916.67 23,916.67 H-Rata rata 1% 286.67 23,630.00 29,540.00 21,500.00 - - - 24,000.00 -
143 Roster Uk. 20x20 cm (keramik) btn Bh Tidak Ada - 12 22,500.00 50,000.00 37,100.00 37,100.00 43,318.00 Penyesuaian 9% 3,938.00 43,318.00 39,380.00 49,230.00 39,000.00 - 32,500.00 - 42,500.00 -
144 Roster Uk. 40x40 cm (keramik) btn Bh Tidak Ada - 3 58,000.00 58,000.00 58,000.00 58,000.00 58,000.00 H-Rata rata 9% 5,500.00 52,500.00 65,630.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
145 Tali ijuk btn Kg Tidak Ada - 5 8,000.00 15,000.00 11,000.00 11,000.00 28,875.00 Penyesuaian 9% 2,625.00 28,875.00 26,250.00 32,810.00 - - - 15,000.00 - -
146 Ampelas cat Lbr 3,000.00 3 14 2,500.00 15,000.00 5,791.67 3,000.00 3,465.00 Penyesuaian 9% 315.00 3,465.00 3,150.00 3,940.00 2,500.00 - - 5,000.00 3,000.00 -
147 Cat Dasar /Alkali (Dulux/ Setara) cat Kg 115,000.00 3 16 50,000.00 150,000.00 116,285.71 115,000.00 59,065.00 0.00 11% 6,565.00 52,500.00 65,630.00 125,000.00 - - 125,000.00 115,000.00 120,000.00
148 Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) cat Kg 55,000.00 6 18 45,000.00 94,000.00 56,875.00 55,000.00 55,000.00 H-Dominan 14% 7,750.00 47,250.00 59,060.00 52,000.00 - - 51,000.00 55,000.00 -
149 Cat Marka cat Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 129,590.00 0.00 11% 14,400.00 115,190.00 143,990.00 - - - - - -
150 Cat Menie Kayu/Besi/Seng (Glotex Setara) cat Kg 30,000.00 2 15 28,000.00 343,000.00 70,500.00 30,000.00 46,200.00 Penyesuaian 9% 4,200.00 46,200.00 42,000.00 52,500.00 28,500.00 - - - 195,000.00 -
151 Cat Multiguard cat Kg 50,000.00 2 4 50,000.00 50,000.00 50,000.00 50,000.00 51,975.00 Penyesuaian 9% 4,725.00 51,975.00 47,250.00 59,060.00 - - - - - -
152 Cat Tembok (Dulux/ICI setara) cat Kg Tidak Ada - 13 50,000.00 269,000.00 163,681.82 163,681.82 75,600.00 0.00 11% 8,400.00 67,200.00 84,000.00 225,000.00 - - 125,000.00 - 108,500.00
153 Cat Tembok (Metrolite/ Catylac/ Setara) cat Kg 95,000.00 4 15 90,000.00 110,000.00 100,307.69 95,000.00 23,625.00 0.00 11% 2,625.00 21,000.00 26,250.00 110,000.00 - 95,000.00 - - 90,000.00
154 Cat Tembok Biasa cat Kg 40,000.00 5 15 26,000.00 50,000.00 41,846.15 40,000.00 17,720.00 0.00 11% 1,970.00 15,750.00 19,690.00 40,000.00 - 40,000.00 45,000.00 - -
155 Cat Waterproofing (Setara Aquaproof) cat Kg 50,000.00 4 18 20,000.00 850,000.00 140,906.25 50,000.00 57,750.00 Penyesuaian 9% 5,250.00 57,750.00 52,500.00 65,630.00 50,000.00 - 52,500.00 - 185,000.00 -
156 Chipping cat Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,420.00 0.00 11% 160.00 1,260.00 1,580.00 - - - - - -
157 Compound Gypsum cat Kg 75,000.00 3 18 5,000.00 90,000.00 65,968.75 75,000.00 11,815.00 0.00 11% 1,315.00 10,500.00 13,130.00 75,000.00 - 5,000.00 5,000.00 85,000.00 71,500.00
158 Dempul Besi cat Kg 35,000.00 3 12 22,500.00 110,000.00 44,300.00 35,000.00 57,750.00 Penyesuaian 9% 5,250.00 57,750.00 52,500.00 65,630.00 28,500.00 - 22,500.00 - 35,000.00 -
159 Dempul Kayu/Wood Filler (Impra Setara) cat Kg 30,000.00 3 17 17,000.00 72,500.00 40,000.00 30,000.00 46,200.00 Penyesuaian 9% 4,200.00 46,200.00 42,000.00 52,500.00 65,000.00 - 30,000.00 - 72,500.00 31,500.00
160 Kuas cat Bh Tidak Ada - 3 23,000.00 23,000.00 23,000.00 23,000.00 14,175.00 0.00 11% 1,575.00 12,600.00 15,750.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
161 Lem Eha-Bond cat Ltr 35,000.00 7 18 5,000.00 60,000.00 30,062.50 35,000.00 40,425.00 Penyesuaian 9% 3,675.00 40,425.00 36,750.00 45,940.00 37,500.00 - 35,000.00 27,000.00 35,000.00 -
162 Minyak Cat / Thiner cat Ltr 22,500.00 6 21 19,000.00 80,000.00 28,052.63 22,500.00 22,500.00 H-Dominan 7% 1,500.00 21,000.00 26,250.00 22,500.00 - 22,500.00 25,000.00 25,000.00 22,500.00
163 Paper Tape cat M¹ 10,000.00 2 6 7,500.00 10,000.00 8,875.00 10,000.00 1,180.00 0.00 11% 130.00 1,050.00 1,310.00 - - - - 8,000.00 -
164 Plamir cat Kg 40,000.00 2 10 40,000.00 58,000.00 45,937.50 40,000.00 23,230.00 0.00 11% 2,580.00 20,650.00 25,810.00 42,500.00 - - - 40,000.00 42,000.00
165 Plamur Tembok (Danapaint Setara) cat Kg 45,000.00 3 11 20,000.00 60,000.00 46,055.56 45,000.00 21,160.00 0.00 11% 2,350.00 18,810.00 23,510.00 - - - 45,000.00 - -
166 Politur cat Ltr 45,000.00 2 11 45,000.00 70,000.00 55,888.89 45,000.00 45,000.00 H-Dominan 12% 5,620.00 39,380.00 49,230.00 58,000.00 - - - - -
167 Sherlak cat Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 59,065.00 0.00 11% 6,565.00 52,500.00 65,630.00 - - - - - -
168 Soda api cat Kg 25,000.00 2 12 10,000.00 47,500.00 30,250.00 25,000.00 11,815.00 0.00 11% 1,315.00 10,500.00 13,130.00 12,500.00 - - 15,000.00 10,000.00 47,500.00
169 Spiritus cat Ltr 10,000.00 5 13 8,000.00 220,000.00 30,681.82 10,000.00 11,550.00 Penyesuaian 9% 1,050.00 11,550.00 10,500.00 13,130.00 12,500.00 - 17,500.00 12,000.00 220,000.00
170 Teak oil cat Ltr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 33,370.00 0.00 11% 3,710.00 29,660.00 37,080.00 - - - - - -
171 Kaca One Way 10 mm jp M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,181,250.00 0.00 11% 131,250.00 1,050,000.00 1,312,500.00 - - - - - -
172 Kaca One Way 5 mm jp M2 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 606,375.00 Penyesuaian 9% 55,125.00 606,375.00 551,250.00 689,060.00 - - - - - -
173 Rangka Aluminium 3" coklat jp Ujg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 167,475.00 Penyesuaian 9% 15,225.00 167,475.00 152,250.00 190,310.00 - - - - - -
174 Rangka Aluminium 3" Silver jp Ujg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 144,375.00 Penyesuaian 9% 13,125.00 144,375.00 131,250.00 164,060.00 - - - - - -
175 Rangka Aluminium 4" coklat jp Ujg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 225,225.00 Penyesuaian 9% 20,475.00 225,225.00 204,750.00 255,940.00 - - - - - -
176 Rangka Aluminium 4" Silver jp Ujg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 171,280.00 0.00 11% 19,030.00 152,250.00 190,310.00 - - - - - -
177 Kayu Bakar k M³ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 236,250.00 0.00 11% 26,250.00 210,000.00 262,500.00 - - - - - -
178 Kayu Kelas I (Kayu Besi, dll.) k M³ 10,000,000.00 2 4 8,000,000.00 9,500,000.00 8,750,000.00 10,000,000.00 10,000,000.00 H-Dominan 0% 0.00 10,000,000.00 10,000,000.00 10,000,000.00 - - - - - -
179 Kayu Kelas I (Kayu Linggua,dll.) k M³ 10,000,000.00 2 4 8,000,000.00 9,500,000.00 8,750,000.00 10,000,000.00 10,000,000.00 H-Dominan 0% 0.00 10,000,000.00 10,000,000.00 10,000,000.00 - - - - - -
180 Kayu Kelas II (Kayu Cempaka, dll.) k M³ 7,000,000.00 2 6 3,000,000.00 5,750,000.00 4,812,500.00 7,000,000.00 7,350,000.00 Penyesuaian 5% 350,000.00 7,350,000.00 7,000,000.00 7,000,000.00 - - - - - -
181 Kayu Kelas III (Kayu Nantu, dll.) k M³ 5,000,000.00 2 8 1,900,000.00 4,500,000.00 2,883,333.33 5,000,000.00 5,250,000.00 Penyesuaian 5% 250,000.00 5,250,000.00 5,000,000.00 5,000,000.00 2,000,000.00 - - - - -
182 Kayu Kelas IV (Kayu Telon, dll.) k M³ 1,800,000.00 3 6 1,500,000.00 1,900,000.00 1,687,500.00 1,800,000.00 1,800,000.00 H-Dominan 0% 0.00 1,800,000.00 1,800,000.00 1,800,000.00 - - - - - -
183 Perancah kayu k M³ 2,100,000.00 2 2 0.00 0.00 Tdk Ada Data 2,100,000.00 2,200,000.00 Penyesuaian 5% 100,000.00 2,200,000.00 2,100,000.00 2,100,000.00 - - - - - -
184 Asbes Gelombang Besar kp Lbr Tidak Ada - 4 35,000.00 40,000.00 37,500.00 37,500.00 46,200.00 Penyesuaian 9% 4,200.00 46,200.00 42,000.00 52,500.00 - - - - - -
185 Asbes Gelombang Kecil kp Lbr 35,000.00 2 4 35,000.00 35,000.00 35,000.00 35,000.00 31,310.00 0.00 11% 3,480.00 27,830.00 34,790.00 - - - - - -
186 Atap alumunium gelombang tebal 0.55 mm kp M² Tidak Ada - 3 55,000.00 55,000.00 55,000.00 55,000.00 63,525.00 Penyesuaian 9% 5,775.00 63,525.00 57,750.00 72,190.00 - - - - - -
187 Atap Genteng Metal (setara Multi Roof) kp M² 90,000.00 3 9 46,000.00 90,000.00 79,857.14 90,000.00 90,000.00 H-Dominan 20% 17,810.00 72,190.00 90,240.00 83,500.00 - - - - -
188 Atap Genteng Metal (setara Sakura Roof:80 cmX 80 cm) kp M² 30,000.00 4 11 30,000.00 46,000.00 32,777.78 30,000.00 63,525.00 Penyesuaian 9% 5,775.00 63,525.00 57,750.00 72,190.00 32,000.00 - - - 30,000.00 -
189 Atap Onduline Gelombang 0.95 * 1.95 M kp M² 150,000.00 2 6 42,000.00 155,000.00 124,250.00 150,000.00 93,555.00 Penyesuaian 9% 8,505.00 93,555.00 85,050.00 106,310.00 155,000.00 - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 17 14 15 16 7 8 9 10 11 12
190 Atap Spandek kp Ujg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 76,780.00 0.00 11% 8,530.00 68,250.00 85,310.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
191 Bubungan Genteng Metal (setara Multi Roof) kp Bh Tidak Ada - 6 27,500.00 35,000.00 31,000.00 31,000.00 54,868.00 Penyesuaian 9% 4,988.00 54,868.00 49,880.00 62,350.00 35,000.00 - - - - -
192 Bubungan Genteng Metal (setara Sakura Roof) kp Bh 30,000.00 3 8 27,500.00 35,000.00 30,083.33 30,000.00 39,270.00 Penyesuaian 9% 3,570.00 39,270.00 35,700.00 44,630.00 35,000.00 - - - 30,000.00 -
193 Eternit (Asbes) kp M² Tidak Ada - 3 33,000.00 33,000.00 33,000.00 33,000.00 33,000.00 H-Rata rata 5% 1,500.00 31,500.00 39,380.00 - - - - - -
194 Flashing Genteng Metal (setara Multi Roof) kp M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 35,440.00 0.00 11% 3,940.00 31,500.00 39,380.00 - - - - - -
195 Flashing Genteng Metal (setara Sakura Roof) kp M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 32,490.00 0.00 11% 3,610.00 28,880.00 36,100.00 - - - - - -
196 Genteng (setara Genteng Kodok) kp Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 41,345.00 0.00 11% 4,595.00 36,750.00 45,940.00 - - - - - -
197 Genteng Aspal kp Lbr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 82,690.00 0.00 11% 9,190.00 73,500.00 91,880.00 - - - - - -
198 Genteng Beton kp Lbr Tidak Ada - 3 10,000.00 10,000.00 10,000.00 10,000.00 34,650.00 Penyesuaian 9% 3,150.00 34,650.00 31,500.00 39,380.00 - - - - - -
199 Genteng Kaca kp Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 53,155.00 0.00 11% 5,905.00 47,250.00 59,060.00 - - - - - -
200 Genteng Keramik kp Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 35,440.00 0.00 11% 3,940.00 31,500.00 39,380.00 - - - - - -
201 Genteng Sirap kp Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 5,905.00 0.00 11% 655.00 5,250.00 6,560.00 - - - - - -
202 Karpus Asbes Gelombang Besar kp Lbr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 41,345.00 0.00 11% 4,595.00 36,750.00 45,940.00 - - - - - -
203 Karpus Asbes Gelombang Kecil kp Lbr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 27,170.00 0.00 11% 3,020.00 24,150.00 30,190.00 - - - - - -
204 Karpus Genteng (setara Genteng Kodok) kp Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 20,680.00 0.00 11% 2,300.00 18,380.00 22,980.00 - - - - - -
205 Karpus Genteng Beton kp Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 11,815.00 0.00 11% 1,315.00 10,500.00 13,130.00 - - - - - -
206 Karpus Genteng Keramik kp Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 32,490.00 0.00 11% 3,610.00 28,880.00 36,100.00 - - - - - -
207 Kaso 3/5 kp Btg Tidak Ada - 4 15,000.00 1,850,000.00 932,500.00 932,500.00 26,585.00 0.00 11% 2,955.00 23,630.00 29,540.00 - - - - - 15,000.00
208 Nok alumunium standar 40 cm 18, swg 22 kp Lbr Tidak Ada - 4 15,000.00 25,000.00 20,000.00 20,000.00 57,750.00 Penyesuaian 9% 5,250.00 57,750.00 52,500.00 65,630.00 - - - - - -
209 Nok genteng beton kp Bh Tidak Ada - 3 55,000.00 55,000.00 55,000.00 55,000.00 41,345.00 0.00 11% 4,595.00 36,750.00 45,940.00 - - - - - -
210 Nok Samping Genteng Metal (setara Multi Roof) kp Bh Tidak Ada - 4 40,000.00 65,000.00 52,500.00 52,500.00 40,165.00 0.00 11% 4,465.00 35,700.00 44,630.00 - - - - - -
211 Nok Samping Genteng Metal (setara Sakura Roof) kp Bh Tidak Ada - 5 30,000.00 45,000.00 35,833.33 35,833.33 35,833.33 H-Rata rata 0% 133.33 35,700.00 44,630.00 - - - - - -
212 Policarbonate kp M² Tidak Ada - 5 50,000.00 1,650,000.00 1,100,000.00 1,100,000.00 127,050.00 Penyesuaian 9% 11,550.00 127,050.00 115,500.00 144,380.00 - - - - - -
213 Seng Fiberglass kp Lbr 75,000.00 2 7 60,000.00 90,000.00 74,000.00 75,000.00 64,970.00 0.00 11% 7,220.00 57,750.00 72,190.00 - - - - - 60,000.00
214 Seng Gelombang Alluminium 0,25 mm kp Lbr 53,000.00 4 15 47,000.00 55,000.00 52,769.23 53,000.00 53,000.00 H-Dominan 5% 2,600.00 50,400.00 63,000.00 53,000.00 - 55,000.00 - 52,000.00 -
215 Seng Gelombang Alluminium 0,30 mm kp Lbr Tidak Ada - 5 62,000.00 75,000.00 68,166.67 68,166.67 68,166.67 H-Rata rata 14% 9,366.67 58,800.00 73,500.00 - - - - 62,000.00 -
216 Seng Plat Alluminium 0,25 mm kp Lbr 50,000.00 3 12 25,000.00 57,500.00 50,450.00 50,000.00 50,000.00 H-Dominan 12% 5,900.00 44,100.00 55,130.00 54,000.00 - 55,000.00 50,000.00 50,000.00 -
217 Seng Plat Alluminium 0,30 mm kp Lbr Tidak Ada - 6 53,000.00 70,000.00 59,500.00 59,500.00 59,500.00 H-Rata rata 8% 4,900.00 54,600.00 68,250.00 53,000.00 - - - - -
218 Seng Fiberglass Laserlite Plus (uk. 180 x 86 x 0,9 cm) kp Lbr 80,000.00 3 10 65,000.00 85,000.00 77,500.00 80,000.00 80,000.00 H-Dominan 2% 1,250.00 78,750.00 98,440.00 80,000.00 - - 80,000.00 80,000.00 -
219 Seng Gelombang BJLS 20 kp Lbr 42,000.00 2 14 40,000.00 45,000.00 42,520.83 42,000.00 42,000.00 H-Dominan 5% 2,100.00 39,900.00 49,880.00 45,000.00 - 43,500.00 - - 42,000.00
220 Seng Gelombang BJLS 24 kp Lbr Tidak Ada - 3 55,000.00 55,000.00 55,000.00 55,000.00 55,000.00 H-Rata rata 5% 2,500.00 52,500.00 65,630.00 - - - - - -
221 Seng Gelombang BJLS 25 kp Lbr Tidak Ada - 4 49,000.00 55,000.00 52,000.00 52,000.00 66,418.00 Penyesuaian 9% 6,038.00 66,418.00 60,380.00 75,480.00 - - - - - -
222 Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) kp Lbr Tidak Ada - 6 49,000.00 85,000.00 62,000.00 62,000.00 75,075.00 Penyesuaian 9% 6,825.00 75,075.00 68,250.00 85,310.00 - - - 55,000.00 - -
223 Seng Plat BJLS 20 kp Lbr 45,000.00 7 13 15,000.00 50,000.00 42,636.36 45,000.00 45,000.00 H-Dominan 12% 5,620.00 39,380.00 49,230.00 46,000.00 - 45,000.00 50,000.00 - 43,000.00
224 Seng Plat BJLS 25 kp Lbr Tidak Ada - 4 20,000.00 55,000.00 37,500.00 37,500.00 60,060.00 Penyesuaian 9% 5,460.00 60,060.00 54,600.00 68,250.00 - - - - - -
225 Seng Plat BJLS 30 (uk. 91,4 x 182,9 cm) kp Lbr Tidak Ada - 4 25,000.00 75,000.00 50,000.00 50,000.00 67,573.00 Penyesuaian 9% 6,143.00 67,573.00 61,430.00 76,790.00 - - - - - -
226 Internal cove artistik (5 x5x20) cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 5,905.00 0.00 11% 655.00 5,250.00 6,560.00 - - - - - -
227 Marmer kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 354,375.00 0.00 11% 39,375.00 315,000.00 393,750.00 - - - - - -
228 Plint keramik arttistik uk. 10 x 10 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 3,545.00 0.00 11% 395.00 3,150.00 3,940.00 - - - - - -
229 Plint keramik arttistik uk. 10 x 20 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 3,835.00 0.00 11% 425.00 3,410.00 4,260.00 - - - - - -
230 Shower Screen Aluminium kr Bh Tidak Ada - 4 50,000.00 65,000.00 57,500.00 57,500.00 2,887,500.00 Penyesuaian 9% 262,500.00 2,887,500.00 2,625,000.00 3,281,250.00 - - - - - -
231 Tegel Abu-Abu uk. 20x20 cm kr Bh 65,000.00 3 8 60,000.00 68,000.00 63,833.33 65,000.00 2,365.00 0.00 11% 265.00 2,100.00 2,630.00 65,000.00 - - - - -
232 Tegel Abu-Abu uk. 30x30 cm kr Bh 65,000.00 3 7 65,000.00 70,000.00 66,600.00 65,000.00 5,490.00 0.00 11% 610.00 4,880.00 6,100.00 65,000.00 - - - - -
233 Tegel Abu-Abu uk. 40x40 cm kr Bh 70,000.00 2 8 55,000.00 75,000.00 67,833.33 70,000.00 11,125.00 0.00 11% 1,235.00 9,890.00 12,360.00 75,000.00 - - - - -
234 Tegel Berwarna uk. 20x20 cm kr Bh 65,000.00 6 11 57,500.00 65,000.00 63,277.78 65,000.00 2,655.00 0.00 11% 295.00 2,360.00 2,950.00 62,000.00 - - 65,000.00 65,000.00 -
235 Tegel Berwarna uk. 30x30 cm kr Bh 65,000.00 2 9 50,000.00 75,000.00 63,214.29 65,000.00 5,905.00 0.00 11% 655.00 5,250.00 6,560.00 60,000.00 - 57,500.00 50,000.00 - -
236 Tegel Berwarna uk. 40x40 cm kr Bh 60,000.00 2 12 60,000.00 85,000.00 67,950.00 60,000.00 11,500.00 0.00 24% 2,750.00 8,750.00 10,940.00 65,000.00 - 67,500.00 65,000.00 60,000.00 -
237 Tegel Esenza uk. 40x40 cm kr Bh Tidak Ada - 3 125,000.00 125,000.00 125,000.00 125,000.00 82,690.00 0.00 11% 9,190.00 73,500.00 91,880.00 - - - - - -
238 Tegel granite dinding 20 x 20 kr Bh Tidak Ada - 3 68,000.00 68,000.00 68,000.00 68,000.00 35,440.00 0.00 11% 3,940.00 31,500.00 39,380.00 - - - - - -
239 Tegel granite dinding 25 x 50 kr Bh - 2 1 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 H-Rata rata 100% 78,000.00 0.00 0.00 - - - - - -
240 Tegel granite dinding 25 x 60 kr Bh Tidak Ada - 3 95,000.00 95,000.00 95,000.00 95,000.00 70,875.00 0.00 11% 7,875.00 63,000.00 78,750.00 - - - - - -
241 Tegel granite dinding 30 x 30 kr Bh Tidak Ada - 3 72,500.00 72,500.00 72,500.00 72,500.00 115,500.00 Penyesuaian 9% 10,500.00 115,500.00 105,000.00 131,250.00 - - - - - -
242 Tegel granite dinding 30 x 60 kr Bh Tidak Ada - 3 165,000.00 165,000.00 165,000.00 165,000.00 134,665.00 0.00 11% 14,965.00 119,700.00 149,630.00 - - - - - -
243 Tegel granite lantai 20 x 20 kr Bh Tidak Ada - 3 68,000.00 68,000.00 68,000.00 68,000.00 59,065.00 0.00 11% 6,565.00 52,500.00 65,630.00 - - - - - -
244 Tegel granite lantai 30 x 30 kr Bh Tidak Ada - 3 72,500.00 72,500.00 72,500.00 72,500.00 83,743.00 Penyesuaian 9% 7,613.00 83,743.00 76,130.00 95,160.00 - - - - - -
245 Tegel granite lantai 40 x 40 kr Bh Tidak Ada - 4 75,000.00 225,000.00 150,000.00 150,000.00 95,680.00 0.00 11% 10,630.00 85,050.00 106,310.00 225,000.00 - - - - -
246 Tegel granite lantai 50 x 50 kr Bh Tidak Ada - 3 95,000.00 95,000.00 95,000.00 95,000.00 115,500.00 Penyesuaian 9% 10,500.00 115,500.00 105,000.00 131,250.00 - - - - - -
247 Tegel granite lantai 60 x 60 kr Bh Tidak Ada - 5 175,000.00 225,000.00 195,000.00 195,000.00 195,000.00 H-Rata rata 19% 37,500.00 157,500.00 196,880.00 225,000.00 - - - - -
248 Tegel granite lantai 80 x 80 kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 333,710.00 0.00 11% 37,080.00 296,630.00 370,790.00 - - - - - -
249 Tegel Granito uk. 30x30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 35,440.00 0.00 11% 3,940.00 31,500.00 39,380.00 - - - - - -
250 Tegel Granito uk. 40x40 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 59,065.00 0.00 11% 6,565.00 52,500.00 65,630.00 - - - - - -
251 Tegel Keramik uk. 10x20 cm kr Bh Tidak Ada - 3 65,000.00 65,000.00 65,000.00 65,000.00 1,500.00 0.00 13% 190.00 1,310.00 1,640.00 - - - - - -
252 Tegel Keramik uk. 10x33 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 2,275.00 0.00 -2% -35.00 2,310.00 2,890.00 - - - - - -
253 Tegel Keramik uk. 11x11 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,305.00 0.00 11% 145.00 1,160.00 1,450.00 - - - - - -
254 Tegel Keramik uk. 15x15 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 2,125.00 0.00 11% 235.00 1,890.00 2,360.00 - - - - - -
255 Tegel Keramik uk. 15x20 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 2,365.00 0.00 11% 265.00 2,100.00 2,630.00 - - - - - -
256 Tegel Keramik uk. 20x20 cm kr Bh 60,000.00 3 8 60,000.00 65,000.00 62,250.00 60,000.00 3,000.00 0.00 21% 640.00 2,360.00 2,950.00 - - 63,500.00 60,000.00 60,000.00 -
257 Tegel Keramik uk. 20x25 cm kr Bh 65,000.00 4 7 63,500.00 65,000.00 64,700.00 65,000.00 3,750.00 0.00 30% 1,120.00 2,630.00 3,290.00 - - 63,500.00 - 65,000.00 -
258 Tegel Keramik uk. 25x25 cm kr Bh 65,000.00 2 5 65,000.00 75,000.00 68,333.33 65,000.00 4,700.00 0.00 11% 530.00 4,170.00 5,210.00 - - - - - -
259 Tegel Keramik uk. 30x30 cm kr Bh Tidak Ada - 7 50,000.00 77,000.00 62,800.00 62,800.00 6,800.00 0.00 35% 2,400.00 4,400.00 5,500.00 - - 52,000.00 50,000.00 - -
260 Tegel Keramik uk. 30x30 cm antislip kr Bh 65,000.00 2 6 65,000.00 77,000.00 70,500.00 65,000.00 6,850.00 0.00 0% 20.00 6,830.00 8,540.00 - - - - - -
261 Tegel Keramik uk. 33x33 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 10,520.00 0.00 11% 1,170.00 9,350.00 11,690.00 - - - - - -
262 Tegel Keramik uk. 33x33 cm anti slip kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 10,285.00 0.00 11% 1,145.00 9,140.00 11,430.00 - - - - - -
263 Tegel Keramik uk. 40x40 cm anti slip kr Bh Tidak Ada - 4 75,000.00 85,000.00 80,000.00 80,000.00 13,700.00 0.00 0% 40.00 13,660.00 17,080.00 - - - - - -
264 Tegel mosaik 30 x 30 cm, ex lokal kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 56,115.00 0.00 11% 6,235.00 49,880.00 62,350.00 - - - - - -
265 Tegel Plint granito uk. 10x30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 35,440.00 0.00 11% 3,940.00 31,500.00 39,380.00 - - - - - -
266 Tegel Plint granito uk. 10x40 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 40,165.00 0.00 11% 4,465.00 35,700.00 44,630.00 - - - - - -
267 Tegel Plint granito uk. 15x30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 37,800.00 0.00 11% 4,200.00 33,600.00 42,000.00 - - - - - -
268 Tegel Plint pc abu-abu uk. 15x30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 2,070.00 0.00 11% 230.00 1,840.00 2,300.00 - - - - - -
269 Tegel Plint pc abu-abu uk. 10x30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,780.00 0.00 11% 200.00 1,580.00 1,980.00 - - - - - -
270 Tegel Plint pc abu-abu uk. 10x40 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,890.00 0.00 11% 210.00 1,680.00 2,100.00 - - - - - -
271 Tegel Plint pc warna uk. 10x40 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 2,079.00 Penyesuaian 9% 189.00 2,079.00 1,890.00 2,360.00 - - - - - -
272 Tegel Plint teralux kerang uk. 10x30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 36,620.00 0.00 11% 4,070.00 32,550.00 40,690.00 - - - - - -
273 Tegel Plint teralux kerang uk. 10x40 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 36,620.00 0.00 11% 4,070.00 32,550.00 40,690.00 - - - - - -
274 Tegel Plint teralux kerang uk. 15x30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 38,980.00 0.00 11% 4,330.00 34,650.00 43,310.00 - - - - - -
275 Tegel Plint teralux marmer uk. 10x30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 41,345.00 0.00 11% 4,595.00 36,750.00 45,940.00 - - - - - -
276 Tegel Plint teralux marmer uk. 10x40 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 42,525.00 0.00 11% 4,725.00 37,800.00 47,250.00 - - - - - -
277 Tegel Plint teralux marmer uk. 10x60 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 44,305.00 0.00 11% 4,925.00 39,380.00 49,230.00 - - - - - -
278 Tegel Plint Teraso uk. 10x30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 7,090.00 0.00 11% 790.00 6,300.00 7,880.00 - - - - - -
279 Tegel Plint Teraso uk. 10x40 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 7,685.00 0.00 11% 855.00 6,830.00 8,540.00 - - - - - -
280 Tegel Plint Teraso uk. 15x30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 5,320.00 0.00 11% 590.00 4,730.00 5,910.00 - - - - - -
281 Tegel Plint warna uk. 10x20 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 2,655.00 0.00 11% 295.00 2,360.00 2,950.00 - - - - - -
282 Tegel Porselin putih uk. 11x11 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,000.00 0.00 11% 110.00 890.00 1,110.00 - - - - - -
283 Tegel teralux kerang uk. 30 x 30 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 33,075.00 0.00 11% 3,675.00 29,400.00 36,750.00 - - - - - -
284 Tegel teralux kerang uk. 40 x 40 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 49,615.00 0.00 11% 5,515.00 44,100.00 55,130.00 - - - - - -
285 Tegel teralux marmer uk. 40 x 40 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 100,405.00 0.00 11% 11,155.00 89,250.00 111,560.00 - - - - - -
286 Tegel teralux marmer uk. 60 x 60 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 177,190.00 0.00 11% 19,690.00 157,500.00 196,880.00 - - - - - -
287 Tegel Wafel uk. 20x20 cm kr Bh Tidak Ada - 3 65,000.00 65,000.00 65,000.00 65,000.00 1,945.00 0.00 11% 215.00 1,730.00 2,160.00 - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 17 14 15 16 7 8 9 10 11 12
288 Ubin keramik arttistik uk. 10 x 10 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 4,140.00 0.00 11% 460.00 3,680.00 4,600.00 - - - - - -
289 Ubin keramik arttistik uk. 10 x 20 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 8,270.00 0.00 11% 920.00 7,350.00 9,190.00 - - - - - -
290 Ubin keramik arttistik uk. 15 x 15 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 9,305.00 0.00 11% 1,035.00 8,270.00 10,340.00 - - - - - -
291 Ubin keramik arttistik uk. 5 x 20 cm kr Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 4,140.00 0.00 11% 460.00 3,680.00 4,600.00 - - - - - -
292 Ubin tahan asam kr M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 76,780.00 0.00 11% 8,530.00 68,250.00 85,310.00 - - - - - -
293 Bak Cuci Stainless Steel (1 Lobang) la Bh 200,000.00 2 15 160,000.00 638,000.00 294,076.92 200,000.00 200,000.00 H-Dominan -31% -62,500.00 262,500.00 328,130.00 160,000.00 - 275,000.00 - 195,000.00 -
294 Bak Cuci Stainless Steel (2 Lobang) la Bh 400,000.00 2 15 200,000.00 960,000.00 494,307.69 400,000.00 519,750.00 Penyesuaian 9% 47,250.00 519,750.00 472,500.00 590,630.00 550,000.00 - 500,000.00 - 320,000.00 -
295 Bak Mandi Fiberglass la Bh 350,000.00 2 9 250,000.00 430,000.00 325,714.29 350,000.00 577,500.00 Penyesuaian 9% 52,500.00 577,500.00 525,000.00 656,250.00 350,000.00 - - 275,000.00 - -
296 Bathub la Bh Tidak Ada - 4 2,575,000.00 2,800,000.00 2,687,500.00 2,687,500.00 3,465,000.00 Penyesuaian 9% 315,000.00 3,465,000.00 3,150,000.00 3,937,500.00 - - - - - -
297 Biofill BF 8 la Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 10,741,500.00 Penyesuaian 9% 976,500.00 10,741,500.00 9,765,000.00 12,206,250.00 - - - - - -
298 Floor Drain la Bh 17,500.00 2 9 15,000.00 50,000.00 28,571.43 17,500.00 23,100.00 Penyesuaian 9% 2,100.00 23,100.00 21,000.00 26,250.00 20,000.00 - - - 15,000.00 -
299 Jet Pump Grundfos; Head 50 m; kap. 72 l/dt la Unit Tidak Ada - 5 2,000,000.00 2,920,000.00 2,573,333.33 2,573,333.33 3,465,000.00 Penyesuaian 9% 315,000.00 3,465,000.00 3,150,000.00 3,937,500.00 - - - - - -
300 Jet Pump; Head 30 m; kap. 30 l/dt la Unit Tidak Ada - 5 755,000.00 2,300,000.00 1,518,333.33 1,518,333.33 1,732,500.00 Penyesuaian 9% 157,500.00 1,732,500.00 1,575,000.00 1,968,750.00 - - - - - -
301 Kitchen Set la M¹ Tidak Ada - 4 1,008,000.00 2,500,000.00 1,754,000.00 1,754,000.00 1,754,000.00 H-Rata rata 10% 179,000.00 1,575,000.00 1,968,750.00 - - - - 2,500,000.00 -
302 Kloset Duduk Keramik Standar la Bh 650,000.00 2 18 95,000.00 1,800,000.00 613,500.00 650,000.00 981,750.00 Penyesuaian 9% 89,250.00 981,750.00 892,500.00 1,115,630.00 605,000.00 - 550,000.00 650,000.00 600,000.00 -
303 Kloset Jongkok Keramik Standar la Bh 130,000.00 3 17 100,000.00 2,500,000.00 603,333.33 130,000.00 202,125.00 Penyesuaian 9% 18,375.00 202,125.00 183,750.00 229,690.00 245,000.00 - 150,000.00 125,000.00 265,000.00 -
304 Kloset Monoblok Lokal la Bh Tidak Ada - 5 605,000.00 1,100,000.00 835,000.00 835,000.00 1,097,250.00 Penyesuaian 9% 99,750.00 1,097,250.00 997,500.00 1,246,880.00 - - - - - -
305 Mata Kran Standar 1/2" la Bh 15,000.00 6 16 10,000.00 175,000.00 30,821.43 15,000.00 64,900.00 Penyesuaian 9% 5,900.00 64,900.00 59,000.00 73,750.00 - - 17,500.00 20,000.00 10,000.00 -
306 Mata Kran Standar 3/4" la Bh 25,000.00 4 14 15,000.00 35,000.00 23,191.67 25,000.00 108,515.00 Penyesuaian 9% 9,865.00 108,515.00 98,650.00 123,310.00 15,000.00 - 20,000.00 35,000.00 - -
307 Pipa Galvanis (medium A) dia. 1" la M¹ 135,000.00 2 10 135,000.00 200,000.00 174,187.50 135,000.00 41,345.00 0.00 11% 4,595.00 36,750.00 45,940.00 195,000.00 - - - 170,000.00 -
308 Pipa Galvanis (medium A) dia. 1/2" la M¹ Tidak Ada - 11 65,000.00 135,000.00 103,555.56 103,555.56 23,625.00 0.00 11% 2,625.00 21,000.00 26,250.00 135,000.00 - - 110,000.00 105,000.00 -
309 Pipa Galvanis (medium A) dia. 2" la M¹ 350,000.00 2 10 250,000.00 475,000.00 352,375.00 350,000.00 79,740.00 0.00 11% 8,860.00 70,880.00 88,600.00 346,000.00 - - 475,000.00 375,000.00 -
310 Pipa Galvanis (medium A) dia. 3" la M¹ Tidak Ada - 10 140,000.00 1,025,000.00 577,312.50 577,312.50 132,895.00 0.00 11% 14,765.00 118,130.00 147,660.00 580,000.00 - - 525,000.00 650,000.00 -
311 Pipa Galvanis (medium A) dia. 3/4" la M¹ Tidak Ada - 11 100,000.00 155,000.00 134,444.44 134,444.44 32,490.00 0.00 11% 3,610.00 28,880.00 36,100.00 147,500.00 - - 150,000.00 135,000.00 -
312 Pipa Galvanis (medium B) dia. 1" la M¹ Tidak Ada - 7 42,000.00 100,000.00 81,200.00 81,200.00 17,720.00 0.00 11% 1,970.00 15,750.00 19,690.00 - - - - 80,000.00 -
313 Pipa Galvanis (medium B) dia. 1/2" la M¹ 55,000.00 2 8 52,500.00 170,000.00 75,750.00 55,000.00 10,630.00 0.00 11% 1,180.00 9,450.00 11,810.00 67,500.00 - - - 52,500.00 -
314 Pipa Galvanis (medium B) dia. 2" la M¹ Tidak Ada - 7 150,000.00 225,000.00 178,300.00 178,300.00 100,835.00 0.00 11% 11,205.00 89,630.00 112,040.00 225,000.00 - - - 150,000.00 -
315 Pipa Galvanis (medium B) dia. 3" la M¹ Tidak Ada - 5 58,000.00 400,000.00 277,666.67 277,666.67 64,970.00 0.00 11% 7,220.00 57,750.00 72,190.00 - - - - - -
316 Pipa Galvanis (medium B) dia. 3/4" la M¹ Tidak Ada - 6 68,500.00 80,000.00 74,000.00 74,000.00 14,770.00 0.00 11% 1,640.00 13,130.00 16,410.00 - - - - 72,500.00 -
317 Pipa Galvanis Light (biasa) dia. 1" la M¹ Tidak Ada - 3 53,500.00 53,500.00 53,500.00 53,500.00 17,720.00 0.00 11% 1,970.00 15,750.00 19,690.00 - - - - - -
318 Pipa Galvanis Light (biasa) dia. 1/2" la M¹ Tidak Ada - 4 32,500.00 47,500.00 40,000.00 40,000.00 8,865.00 0.00 11% 985.00 7,880.00 9,850.00 - - - - - -
319 Pipa Galvanis Light (biasa) dia. 2" la M¹ Tidak Ada - 4 113,000.00 135,000.00 124,000.00 124,000.00 28,125.00 0.00 11% 3,125.00 25,000.00 31,250.00 - - - - - -
320 Pipa Galvanis Light (biasa) dia. 3" la M¹ Tidak Ada - 3 256,500.00 256,500.00 256,500.00 256,500.00 62,020.00 0.00 11% 6,890.00 55,130.00 68,910.00 - - - - - -
321 Pipa Galvanis Light (biasa) dia. 3/4" la M¹ Tidak Ada - 4 42,000.00 75,000.00 58,500.00 58,500.00 11,815.00 0.00 11% 1,315.00 10,500.00 13,130.00 - - - - - -
322 Pipa Polyethylene (PE) dia. 1" la M¹ 12,500.00 2 5 12,000.00 12,500.00 12,333.33 12,500.00 13,860.00 Penyesuaian 9% 1,260.00 13,860.00 12,600.00 15,750.00 12,500.00 - - - - -
323 Pipa Polyethylene (PE) dia. 3/4" la M¹ Tidak Ada - 5 8,000.00 9,500.00 8,833.33 8,833.33 9,823.00 Penyesuaian 9% 893.00 9,823.00 8,930.00 11,160.00 9,500.00 - - - - -
324 Pipa Polyteline PE dia. 1 1/2" la M¹ Tidak Ada - 4 6,500.00 7,000.00 6,750.00 6,750.00 28,875.00 Penyesuaian 9% 2,625.00 28,875.00 26,250.00 32,810.00 6,500.00 - - - - -
325 Pipa Porous la M¹ Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 38,635.00 0.00 11% 4,295.00 34,340.00 42,930.00 - - - - - -
326 Pipa PVC dia. 1" AW la M¹ 35,000.00 5 19 25,000.00 40,000.00 35,588.24 35,000.00 6,930.00 Penyesuaian 9% 630.00 6,930.00 6,300.00 7,880.00 37,500.00 39,000.00 36,000.00 - 37,500.00 36,000.00
327 Pipa PVC dia. 1,5" AW la M¹ 60,000.00 4 19 20,000.00 115,000.00 60,694.12 60,000.00 11,550.00 Penyesuaian 9% 1,050.00 11,550.00 10,500.00 13,130.00 62,000.00 65,000.00 60,000.00 - 67,500.00 60,000.00
328 Pipa PVC dia. 2" AW la M¹ 75,000.00 3 19 53,500.00 151,000.00 78,882.35 75,000.00 17,325.00 Penyesuaian 9% 1,575.00 17,325.00 15,750.00 19,690.00 78,000.00 80,000.00 76,000.00 - 80,000.00 76,500.00
329 Pipa PVC (S-12,5) dia. 1/2" AW la M¹ 20,000.00 2 8 19,000.00 27,500.00 21,516.67 20,000.00 4,870.00 0.00 11% 540.00 4,330.00 5,410.00 - 22,000.00 - - - -
330 Pipa PVC (S-12,5) dia. 3/4" AW la M¹ Tidak Ada - 7 25,000.00 28,200.00 26,840.00 26,840.00 5,905.00 0.00 11% 655.00 5,250.00 6,560.00 - 28,000.00 - - - -
331 Pipa PVC dia. 1 1/4" AW la M¹ 52,000.00 2 13 37,500.00 60,000.00 52,636.36 52,000.00 9,240.00 Penyesuaian 9% 840.00 9,240.00 8,400.00 10,500.00 - 57,000.00 52,000.00 54,000.00 60,000.00 52,000.00
332 Pipa PVC dia. 1/2" AW la M¹ 20,000.00 7 14 13,000.00 65,000.00 22,966.67 20,000.00 4,620.00 Penyesuaian 9% 420.00 4,620.00 4,200.00 5,250.00 - - 20,000.00 20,000.00 20,000.00 20,000.00
333 Pipa PVC dia. 3" AW la M¹ 155,000.00 3 17 108,000.00 167,000.00 149,333.33 155,000.00 28,875.00 Penyesuaian 9% 2,625.00 28,875.00 26,250.00 32,810.00 - 160,000.00 145,000.00 155,000.00 160,000.00 145,000.00
334 Pipa PVC dia. 3/4" AW la M¹ 27,000.00 3 15 18,000.00 29,000.00 26,130.77 27,000.00 5,203.00 Penyesuaian 9% 473.00 5,203.00 4,730.00 5,910.00 - - 27,000.00 26,000.00 29,000.00 26,500.00
335 Pipa PVC dia. 4" AW la M¹ 240,000.00 3 16 130,000.00 270,000.00 233,785.71 240,000.00 48,510.00 Penyesuaian 9% 4,410.00 48,510.00 44,100.00 55,130.00 - 270,000.00 234,000.00 256,000.00 240,000.00 240,000.00
336 Pipa GIP (Medium SII) Ø 12" m¹ Tidak Ada - 1 1,318,680.00 1,318,680.00 1,318,680.00 1,318,680.00 1,318,680.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
337 Pipa GIP (Medium SII) Ø 10" m¹ Tidak Ada - 1 986,535.00 986,535.00 986,535.00 986,535.00 986,535.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
338 Pipa GIP (Medium SII) Ø 8" m¹ Tidak Ada - 1 701,800.00 701,800.00 701,800.00 701,800.00 701,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
339 Pipa GIP (Medium SII) Ø 6" m¹ Tidak Ada - 1 484,366.67 484,366.67 484,366.67 484,366.67 484,366.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
340 Pipa GIP (Medium SII) Ø 4" m¹ Tidak Ada - 1 302,316.67 302,316.67 302,316.67 302,316.67 302,316.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
341 Pipa GIP (Medium SII) Ø 3" m¹ Tidak Ada - 1 208,816.67 208,816.67 208,816.67 208,816.67 208,816.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
342 Pipa GIP (Medium SII) Ø 2" m¹ Tidak Ada - 1 126,683.33 126,683.33 126,683.33 126,683.33 126,683.33 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
343 Pipa PVC S-10 Ø 12" RR m¹ Tidak Ada - 1 977,279.17 977,279.17 977,279.17 977,279.17 977,279.17 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
344 Pipa PVC S-10 Ø 10" RR m¹ Tidak Ada - 1 614,304.17 614,304.17 614,304.17 614,304.17 614,304.17 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
345 Pipa PVC S-10 Ø 8" RR m¹ Tidak Ada - 1 395,445.83 395,445.83 395,445.83 395,445.83 395,445.83 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
346 Pipa PVC S-10 Ø 6" RR m¹ Tidak Ada - 1 248,425.00 248,425.00 248,425.00 248,425.00 248,425.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
347 Pipa PVC S-10 Ø 4" RR m¹ Tidak Ada - 1 118,416.67 118,416.67 118,416.67 118,416.67 118,416.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
348 Pipa PVC S-10 Ø 3" RR m¹ Tidak Ada - 1 79,033.33 79,033.33 79,033.33 79,033.33 79,033.33 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
349 Pipa PVC S-10 Ø 2" RR m¹ Tidak Ada - 1 45,150.00 45,150.00 45,150.00 45,150.00 45,150.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
350 Pipa PVC S-10 Ø 1½" SC m¹ Tidak Ada - 1 24,066.67 24,066.67 24,066.67 24,066.67 24,066.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
351 Pipa PVC S-10 Ø 1" SC m¹ Tidak Ada - 1 10,583.33 10,583.33 10,583.33 10,583.33 10,583.33 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
352 Pipa PVC S-10 Ø 3/4" SC m¹ Tidak Ada - 1 9,416.67 9,416.67 9,416.67 9,416.67 9,416.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
353 Pipa PVC S-10 Ø 1/2" SC m¹ Tidak Ada - 1 6,133.33 6,133.33 6,133.33 6,133.33 6,133.33 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
354 Pipa PVC S-12,5 Ø 12" RR m¹ Tidak Ada - 1 800,608.33 800,608.33 800,608.33 800,608.33 800,608.33 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
355 Pipa PVC S-12,5 Ø 10" RR m¹ Tidak Ada - 1 503,566.67 503,566.67 503,566.67 503,566.67 503,566.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
356 Pipa PVC S-12,5 Ø 8" RR m¹ Tidak Ada - 1 322,241.67 322,241.67 322,241.67 322,241.67 322,241.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
357 Pipa PVC S-12,5 Ø 6" RR m¹ Tidak Ada - 1 202,741.67 202,741.67 202,741.67 202,741.67 202,741.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
358 Pipa PVC S-12,5 Ø 4" RR m¹ Tidak Ada - 1 95,679.17 95,679.17 95,679.17 95,679.17 95,679.17 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
359 Pipa PVC S-12,5 Ø 3" RR m¹ Tidak Ada - 1 66,104.17 66,104.17 66,104.17 66,104.17 66,104.17 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
360 Pipa PVC S-12,5 Ø 2" RR m¹ Tidak Ada - 1 32,225.00 32,225.00 32,225.00 32,225.00 32,225.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
361 Pipa PVC S-12,5 Ø 1½" SC m¹ Tidak Ada - 1 24,066.67 24,066.67 24,066.67 24,066.67 24,066.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
362 Pipa PVC S-12,5 Ø 1" SC m¹ Tidak Ada - 1 10,583.33 10,583.33 10,583.33 10,583.33 10,583.33 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
363 Pipa PVC S-12,5 Ø 3/4" SC m¹ Tidak Ada - 1 9,416.67 9,416.67 9,416.67 9,416.67 9,416.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
364 Pipa PVC S-12,5 Ø 1/2" SC m¹ Tidak Ada - 1 6,133.33 6,133.33 6,133.33 6,133.33 6,133.33 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
365 Pipa PE S8-SDR17 (PN10) Ø 12" (315 mm) m¹ Tidak Ada - 1 1,117,115.00 1,117,115.00 1,117,115.00 1,117,115.00 1,117,115.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
366 Pipa PE S8-SDR17 (PN10) Ø 10" (250 mm) m¹ Tidak Ada - 1 702,100.00 702,100.00 702,100.00 702,100.00 702,100.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
367 Pipa PE S8-SDR17 (PN10) Ø 8" (200 mm) m¹ Tidak Ada - 1 451,510.00 451,510.00 451,510.00 451,510.00 451,510.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
368 Pipa PE S8-SDR17 (PN10) Ø 6" (160 mm) m¹ Tidak Ada - 1 288,880.00 288,880.00 288,880.00 288,880.00 288,880.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
369 Pipa PE S8-SDR17 (PN10) Ø 4" (110 mm) m¹ Tidak Ada - 1 138,130.00 138,130.00 138,130.00 138,130.00 138,130.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
370 Pipa PE S8-SDR17 (PN10) Ø 3" (90 mm) m¹ Tidak Ada - 1 92,495.00 92,495.00 92,495.00 92,495.00 92,495.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
371 Pipa PE S8-SDR17 (PN10) Ø 2" (63 mm) m¹ Tidak Ada - 1 46,195.00 46,195.00 46,195.00 46,195.00 46,195.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
372 Pipa PE S8-SDR17 (PN10) Ø 1½" (50 mm) m¹ Tidak Ada - 1 16,400.00 16,400.00 16,400.00 16,400.00 16,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
373 Pipa PE S8-SDR17 (PN10) Ø 11/4" (40 mm) m¹ Tidak Ada - 1 14,500.00 14,500.00 14,500.00 14,500.00 14,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
374 Pipa PE S8-SDR17 (PN10) Ø 1" (32 mm) m¹ Tidak Ada - 1 12,500.00 12,500.00 12,500.00 12,500.00 12,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
375 Pipa PE S8-SDR17 (PN10) Ø ¾" (25 mm) m¹ Tidak Ada - 1 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
376 Pipa PE S8-SDR17 (PN10) Ø ½" (20 mm) m¹ Tidak Ada - 1 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
377 Pipa PE S8-SDR17 (PN10) Ø 1½" (50 mm) m¹ Tidak Ada - 1 16,400.00 16,400.00 16,400.00 16,400.00 16,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
378 Pipa PE S8-SDR17 (PN10) Ø 1" (32 mm) m¹ Tidak Ada - 1 12,500.00 12,500.00 12,500.00 12,500.00 12,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
379 Pipa PE S8-SDR17 (PN10) Ø 3/4" (25 mm) m¹ Tidak Ada - 1 10,400.00 10,400.00 10,400.00 10,400.00 10,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
380 Pipa PE S8-SDR17 (PN10) Ø 1/2" (20 mm) m¹ Tidak Ada - 1 7,900.00 7,900.00 7,900.00 7,900.00 7,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
381 Accessories Gate Valve Double Flanged CI Ø 2" Bh Tidak Ada - 1 715,000.00 715,000.00 715,000.00 715,000.00 715,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
382 Accessories Gate Valve Double Flanged CI Ø 3" Bh Tidak Ada - 1 1,372,800.00 1,372,800.00 1,372,800.00 1,372,800.00 1,372,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
383 Accessories Gate Valve Double Flanged CI Ø 4" Bh Tidak Ada - 1 1,960,200.00 1,960,200.00 1,960,200.00 1,960,200.00 1,960,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
384 Accessories Gate Valve Double Flanged CI Ø 6" Bh Tidak Ada - 1 3,630,000.00 3,630,000.00 3,630,000.00 3,630,000.00 3,630,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
385 Accessories Gate Valve Double Flanged CI Ø 8" Bh Tidak Ada - 1 5,544,000.00 5,544,000.00 5,544,000.00 5,544,000.00 5,544,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
1 2 3 4 5 6 7 8 9 10 11 12 13 17 14 15 16 7 8 9 10 11 12
386 Accessories Gate Valve Double Flanged CI Ø 10" Bh Tidak Ada - 1 6,652,800.00 6,652,800.00 6,652,800.00 6,652,800.00 6,652,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
387 Accessories Gate Valve Double Flanged CI Ø 12" Bh Tidak Ada - 1 9,196,000.00 9,196,000.00 9,196,000.00 9,196,000.00 9,196,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
388 Accessories Stop Kran Ø 100 mm unit Tidak Ada - 1 935,000.00 935,000.00 935,000.00 935,000.00 935,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
389 Accessories Stop Kran Ø 75 mm unit Tidak Ada - 1 550,000.00 550,000.00 550,000.00 550,000.00 550,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
390 Accessories Stop Kran Ø 50 mm unit Tidak Ada - 1 277,200.00 277,200.00 277,200.00 277,200.00 277,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
391 Accessories Stop Kran Ø 25 mm unit Tidak Ada - 1 154,000.00 154,000.00 154,000.00 154,000.00 154,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
392 Accessories Stop Kran Ø 20 mm unit Tidak Ada - 1 57,600.00 57,600.00 57,600.00 57,600.00 57,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
393 Accessories Check Valve (Non Return Valve) Ø 4" unit Tidak Ada - 1 3,520,000.00 3,520,000.00 3,520,000.00 3,520,000.00 3,520,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
394 Accessories Check Valve (Non Return Valve) Ø 6" unit Tidak Ada - 1 4,400,000.00 4,400,000.00 4,400,000.00 4,400,000.00 4,400,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
395 Accessories Check Valve (Non Return Valve) Ø 8" unit Tidak Ada - 1 5,280,000.00 5,280,000.00 5,280,000.00 5,280,000.00 5,280,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
396 Accessories Check Valve (Non Return Valve) Ø 10" unit Tidak Ada - 1 6,336,000.00 6,336,000.00 6,336,000.00 6,336,000.00 6,336,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
397 Accessories Check Valve (Non Return Valve) Ø 12" unit Tidak Ada - 1 7,603,200.00 7,603,200.00 7,603,200.00 7,603,200.00 7,603,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
398 Accessories DF. Water Meter Ø 1/2" unit Tidak Ada - 1 269,900.00 269,900.00 269,900.00 269,900.00 269,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
399 Accessories DF. Water Meter Ø 2" unit Tidak Ada - 1 2,640,000.00 2,640,000.00 2,640,000.00 2,640,000.00 2,640,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
400 Accessories DF. Water Meter Ø 3" unit Tidak Ada - 1 3,564,000.00 3,564,000.00 3,564,000.00 3,564,000.00 3,564,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
401 Accessories DF. Water Meter Ø 4" unit Tidak Ada - 1 4,488,000.00 4,488,000.00 4,488,000.00 4,488,000.00 4,488,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
402 Accessories DF. Water Meter Ø 6" unit Tidak Ada - 1 6,336,000.00 6,336,000.00 6,336,000.00 6,336,000.00 6,336,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
403 Accessories DF. Water Meter Ø 8" unit Tidak Ada - 1 8,448,000.00 8,448,000.00 8,448,000.00 8,448,000.00 8,448,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
404 Accessories DF. Water Meter Ø 10" unit Tidak Ada - 1 13,200,000.00 13,200,000.00 13,200,000.00 13,200,000.00 13,200,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
405 Accessories DF. Water Meter Ø 12" unit Tidak Ada - 1 31,680,000.00 31,680,000.00 31,680,000.00 31,680,000.00 31,680,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
406 Accessories Flanged Air Relief Valve Ø 50 mm unit Tidak Ada - 1 880,000.00 880,000.00 880,000.00 880,000.00 880,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
407 Accessories Air Vent GIP Ø 3" unit Tidak Ada - 1 473,000.00 473,000.00 473,000.00 473,000.00 473,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
408 Accessories All Flanged Tee PVC Ø 4" x 4" unit Tidak Ada - 1 586,850.00 586,850.00 586,850.00 586,850.00 586,850.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
409 Accessories All Flanged Tee PVC Ø 3" x 3" Bh Tidak Ada - 1 522,720.00 522,720.00 522,720.00 522,720.00 522,720.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
410 Accessories All Flanged Tee PVC Ø 3" x 2" Bh Tidak Ada - 1 496,584.00 496,584.00 496,584.00 496,584.00 496,584.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
411 Accessories All Flanged Tee CI Ø 12" X 12" Bh Tidak Ada - 1 3,960,000.00 3,960,000.00 3,960,000.00 3,960,000.00 3,960,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
412 Accessories All Flanged Tee CI Ø 12" X 8" Bh Tidak Ada - 1 3,432,000.00 3,432,000.00 3,432,000.00 3,432,000.00 3,432,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
413 Accessories All Flanged Tee CI Ø 12" X 2" Bh Tidak Ada - 1 2,864,400.00 2,864,400.00 2,864,400.00 2,864,400.00 2,864,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
414 Accessories All Flanged Tee CI Ø 12" x 12" Bh Tidak Ada - 1 4,455,000.00 4,455,000.00 4,455,000.00 4,455,000.00 4,455,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
415 Accessories All Flanged Tee CI Ø 10" x 10" Bh Tidak Ada - 1 2,970,000.00 2,970,000.00 2,970,000.00 2,970,000.00 2,970,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
416 Accessories All Flanged Tee CI Ø 8" x 8" Bh Tidak Ada - 1 1,980,000.00 1,980,000.00 1,980,000.00 1,980,000.00 1,980,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
417 Accessories All Flanged Tee CI Ø 6" x 6" Bh Tidak Ada - 1 1,320,000.00 1,320,000.00 1,320,000.00 1,320,000.00 1,320,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
418 Accessories All Flanged Tee CI Ø 6" x 4" Bh Tidak Ada - 1 1,225,400.00 1,225,400.00 1,225,400.00 1,225,400.00 1,225,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
419 Accessories All Flanged Tee CI Ø 4" x 4" Bh Tidak Ada - 1 1,135,200.00 1,135,200.00 1,135,200.00 1,135,200.00 1,135,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
420 Accessories All Flanged Tee CI Ø 4" x 3" Bh Tidak Ada - 1 786,500.00 786,500.00 786,500.00 786,500.00 786,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
421 Accessories All Flanged Tee CI Ø 4" x 2" Bh Tidak Ada - 1 757,900.00 757,900.00 757,900.00 757,900.00 757,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
422 Accessories All Flanged Tee CI Ø 3" x 2" Bh Tidak Ada - 1 605,000.00 605,000.00 605,000.00 605,000.00 605,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
423 Accessories All Flanged Tee CI Ø 2" x 2" Bh Tidak Ada - 1 275,000.00 275,000.00 275,000.00 275,000.00 275,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
424 Accessories All Flanged Tee Y Cl Ø 12" X 12" Bh Tidak Ada - 1 3,916,000.00 3,916,000.00 3,916,000.00 3,916,000.00 3,916,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
425 Accessories Socket Tee PVC (All RR) Ø 6" x 6" Bh Tidak Ada - 1 1,107,900.00 1,107,900.00 1,107,900.00 1,107,900.00 1,107,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
426 Accessories Socket Tee PVC (All RR) Ø 6" x 4" Bh Tidak Ada - 1 1,095,300.00 1,095,300.00 1,095,300.00 1,095,300.00 1,095,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
427 Accessories Socket Tee PVC (All RR) Ø 4" x 4" Bh Tidak Ada - 1 416,100.00 416,100.00 416,100.00 416,100.00 416,100.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
428 Accessories Socket Tee PVC (All RR) Ø 4" x 3" Bh Tidak Ada - 1 409,300.00 409,300.00 409,300.00 409,300.00 409,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
429 Accessories Socket Tee PVC (All RR) Ø 4" x 2" Bh Tidak Ada - 1 404,300.00 404,300.00 404,300.00 404,300.00 404,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
430 Accessories Socket Tee PVC (All RR) Ø 3" X 3" Bh Tidak Ada - 1 237,600.00 237,600.00 237,600.00 237,600.00 237,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
431 Accessories Socket Tee PVC (All RR) Ø 3" X 2" Bh Tidak Ada - 1 231,100.00 231,100.00 231,100.00 231,100.00 231,100.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
432 Accessories Socket Tee PVC (All RR) Ø 2" X 2" Bh Tidak Ada - 1 174,800.00 174,800.00 174,800.00 174,800.00 174,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
433 Accessories Baut Moor 5/8" x 3" Bh Tidak Ada - 1 8,800.00 8,800.00 8,800.00 8,800.00 8,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
434 Accessories Baut Moor 5/8" x 4" Bh Tidak Ada - 1 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
435 Accessories Blind Flanged Ø 12" Bh Tidak Ada - 1 891,000.00 891,000.00 891,000.00 891,000.00 891,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
436 Accessories Blind Flanged Ø 8" Bh Tidak Ada - 1 715,000.00 715,000.00 715,000.00 715,000.00 715,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
437 Accessories Clem Besi Plat Ø 4" X 2 mm Bh Tidak Ada - 1 49,500.00 49,500.00 49,500.00 49,500.00 49,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
438 Accessories Dop PVC Ø 2" Bh Tidak Ada - 1 32,560.00 32,560.00 32,560.00 32,560.00 32,560.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
439 Accessories Dop PVC Ø 3" Bh Tidak Ada - 1 58,850.00 58,850.00 58,850.00 58,850.00 58,850.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
440 Accessories Dop PVC Ø 4" Bh Tidak Ada - 1 105,600.00 105,600.00 105,600.00 105,600.00 105,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
441 Accessories Dop PVC Ø 6" Bh Tidak Ada - 1 130,130.00 130,130.00 130,130.00 130,130.00 130,130.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
442 Accessories Double Flanged Bend CI Ø 12" X 11,25º Bh Tidak Ada - 1 1,584,000.00 1,584,000.00 1,584,000.00 1,584,000.00 1,584,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
443 Accessories Double Flanged Bend CI Ø 12" X 22,5º Bh Tidak Ada - 1 1,672,000.00 1,672,000.00 1,672,000.00 1,672,000.00 1,672,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
444 Accessories Double Flanged Bend CI Ø 12" X 45º Bh Tidak Ada - 1 1,925,000.00 1,925,000.00 1,925,000.00 1,925,000.00 1,925,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
445 Accessories Double Flanged Bend CI Ø 12" X 90º Bh Tidak Ada - 1 2,757,700.00 2,757,700.00 2,757,700.00 2,757,700.00 2,757,700.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
446 Accessories Double Flanged Bend CI Ø 8" x 22,5º Bh Tidak Ada - 1 473,000.00 473,000.00 473,000.00 473,000.00 473,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
447 Accessories Double Flanged Bend CI Ø 8" x 45º Bh Tidak Ada - 1 532,400.00 532,400.00 532,400.00 532,400.00 532,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
448 Accessories Double Flanged Bend CI Ø 8" x 90º Bh Tidak Ada - 1 627,000.00 627,000.00 627,000.00 627,000.00 627,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
449 Accessories Double Flanged Bend CI Ø 6" x 22,5º Bh Tidak Ada - 1 259,600.00 259,600.00 259,600.00 259,600.00 259,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
450 Accessories Double Flanged Bend CI Ø 6" x 45º Bh Tidak Ada - 1 308,330.00 308,330.00 308,330.00 308,330.00 308,330.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
451 Accessories Double Flanged Bend CI Ø 6" x 90º Bh Tidak Ada - 1 339,900.00 339,900.00 339,900.00 339,900.00 339,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
452 Accessories Double Flanged Bend CI Ø 4" x 11,5º Bh Tidak Ada - 1 112,200.00 112,200.00 112,200.00 112,200.00 112,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
453 Accessories Double Flanged Bend CI Ø 4" x 22,5º Bh Tidak Ada - 1 118,800.00 118,800.00 118,800.00 118,800.00 118,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
454 Accessories Double Flanged Bend CI Ø 4" x 45º Bh Tidak Ada - 1 128,700.00 128,700.00 128,700.00 128,700.00 128,700.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
455 Accessories Double Flanged Bend CI Ø 4" x 90º Bh Tidak Ada - 1 139,700.00 139,700.00 139,700.00 139,700.00 139,700.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
456 Accessories Double Flanged Bend CI Ø 3" x 22,5º Bh Tidak Ada - 1 71,610.00 71,610.00 71,610.00 71,610.00 71,610.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
457 Accessories Double Flanged Bend CI Ø 3" x 45º Bh Tidak Ada - 1 81,510.00 81,510.00 81,510.00 81,510.00 81,510.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
458 Accessories Double Flanged Bend CI Ø 3" x 90º Bh Tidak Ada - 1 91,740.00 91,740.00 91,740.00 91,740.00 91,740.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
459 Accessories Double Flanged Bend CI Ø 2" x 22,5º Bh Tidak Ada - 1 36,630.00 36,630.00 36,630.00 36,630.00 36,630.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
460 Accessories Double Flanged Bend CI Ø 2" x 45º Bh Tidak Ada - 1 39,600.00 39,600.00 39,600.00 39,600.00 39,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
461 Accessories Double Flanged Bend CI Ø 2" x 90º Bh Tidak Ada - 1 44,770.00 44,770.00 44,770.00 44,770.00 44,770.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
462 Accessories Double Flanged Pipe GIP Ø 3" x 60 cm. Bh Tidak Ada - 1 632,280.00 632,280.00 632,280.00 632,280.00 632,280.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
463 Accessories Double Flanged Pipe GIP Ø 3" x 80 cm. Bh Tidak Ada - 1 753,720.00 753,720.00 753,720.00 753,720.00 753,720.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
464 Accessories Double Flanged Pipe GIP Ø 3" x 100 cm. Bh Tidak Ada - 1 935,880.00 935,880.00 935,880.00 935,880.00 935,880.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
465 Accessories Double Flanged Pipe GIP Ø 3" x 120 cm. Bh Tidak Ada - 1 996,600.00 996,600.00 996,600.00 996,600.00 996,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
466 Accessories Double Flanged Pipe GIP Ø 3" x 200 cm. Bh Tidak Ada - 1 1,543,080.00 1,543,080.00 1,543,080.00 1,543,080.00 1,543,080.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
467 Accessories Double Flanged Pipe GIP Ø 4" x 60 cm. Bh Tidak Ada - 1 524,656.00 524,656.00 524,656.00 524,656.00 524,656.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
468 Accessories Double Flanged Pipe GIP Ø 4" x 80 cm. Bh Tidak Ada - 1 638,704.00 638,704.00 638,704.00 638,704.00 638,704.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
469 Accessories Double Flanged Pipe GIP Ø 4" x 100 cm. Bh Tidak Ada - 1 809,776.00 809,776.00 809,776.00 809,776.00 809,776.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
470 Accessories Double Flanged Pipe GIP Ø 4" x 120 cm. Bh Tidak Ada - 1 866,800.00 866,800.00 866,800.00 866,800.00 866,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
471 Accessories Double Flanged Pipe GIP Ø 4" x 180 cm. Bh Tidak Ada - 1 1,208,944.00 1,208,944.00 1,208,944.00 1,208,944.00 1,208,944.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
472 Accessories Flanged Pipe GIP Ø 3" x 60 cm. Bh Tidak Ada - 1 543,840.00 543,840.00 543,840.00 543,840.00 543,840.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
473 Accessories Flanged Pipe GIP Ø 3" x 100 cm. Bh Tidak Ada - 1 786,720.00 786,720.00 786,720.00 786,720.00 786,720.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
474 Accessories Flanged Pipe GIP Ø 3" x 200 cm. Bh Tidak Ada - 1 1,393,920.00 1,393,920.00 1,393,920.00 1,393,920.00 1,393,920.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
475 Accessories Flanged Pipe GIP Ø 4" x 60 cm. Bh Tidak Ada - 1 742,500.00 742,500.00 742,500.00 742,500.00 742,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
476 Accessories Flanged Pipe GIP Ø 4" x 100 cm. Bh Tidak Ada - 1 1,053,066.67 1,053,066.67 1,053,066.67 1,053,066.67 1,053,066.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
477 Accessories Flanged Pipe GIP Ø 4" x 200 cm. Bh Tidak Ada - 1 1,984,766.67 1,984,766.67 1,984,766.67 1,984,766.67 1,984,766.67 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
478 Accessories Flanged Pipe GIP Ø 6" x 60 cm. Bh Tidak Ada - 1 1,195,700.00 1,195,700.00 1,195,700.00 1,195,700.00 1,195,700.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
479 Accessories Flanged Pipe GIP Ø 6" x 80 cm. Bh Tidak Ada - 1 1,564,200.00 1,564,200.00 1,564,200.00 1,564,200.00 1,564,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
480 Accessories Flanged Pipe GIP Ø 6" x 100 cm. Bh Tidak Ada - 1 1,859,000.00 1,859,000.00 1,859,000.00 1,859,000.00 1,859,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
481 Accessories Flanged Pipe GIP Ø 6" x 200 cm. Bh Tidak Ada - 1 3,480,400.00 3,480,400.00 3,480,400.00 3,480,400.00 3,480,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
482 Accessories Double Socket Bend CI for PVC Ø 6" x 11,25º Bh Tidak Ada - 1 1,504,800.00 1,504,800.00 1,504,800.00 1,504,800.00 1,504,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
483 Accessories Double Socket Bend CI for PVC Ø 6" x 22,5º Bh Tidak Ada - 1 1,518,000.00 1,518,000.00 1,518,000.00 1,518,000.00 1,518,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
1 2 3 4 5 6 7 8 9 10 11 12 13 17 14 15 16 7 8 9 10 11 12
484 Accessories Double Socket Bend CI for PVC Ø 6" x 45º Bh Tidak Ada - 1 1,610,400.00 1,610,400.00 1,610,400.00 1,610,400.00 1,610,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
485 Accessories Double Socket Bend CI for PVC Ø 6" x 90º Bh Tidak Ada - 1 1,768,800.00 1,768,800.00 1,768,800.00 1,768,800.00 1,768,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
486 Accessories Flanged Air Relief Valve Ø 2" Bh Tidak Ada - 1 1,685,200.00 1,685,200.00 1,685,200.00 1,685,200.00 1,685,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
487 Accessories Bend Doble Socet PVC Ø 10" X 11,25º Bh Tidak Ada - 1 983,600.00 983,600.00 983,600.00 983,600.00 983,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
488 Accessories Bend Doble Socet PVC Ø 10" X 22,5º Bh Tidak Ada - 1 1,056,400.00 1,056,400.00 1,056,400.00 1,056,400.00 1,056,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
489 Accessories Bend Doble Socet PVC Ø 10" X 45º Bh Tidak Ada - 1 1,188,700.00 1,188,700.00 1,188,700.00 1,188,700.00 1,188,700.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
490 Accessories Bend Doble Socet PVC Ø 10" X 90º Bh Tidak Ada - 1 1,517,800.00 1,517,800.00 1,517,800.00 1,517,800.00 1,517,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
491 Accessories Bend Doble Socet PVC Ø 8" x 22,5º Bh Tidak Ada - 1 591,100.00 591,100.00 591,100.00 591,100.00 591,100.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
492 Accessories Bend Doble Socet PVC Ø 8" x 45º Bh Tidak Ada - 1 666,200.00 666,200.00 666,200.00 666,200.00 666,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
493 Accessories Bend Doble Socet PVC Ø 8" x 90º Bh Tidak Ada - 1 784,900.00 784,900.00 784,900.00 784,900.00 784,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
494 Accessories Bend Doble Socet PVC Ø 6" x 22,5º Bh Tidak Ada - 1 324,600.00 324,600.00 324,600.00 324,600.00 324,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
495 Accessories Bend Doble Socet PVC Ø 6" x 45º Bh Tidak Ada - 1 358,200.00 358,200.00 358,200.00 358,200.00 358,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
496 Accessories Bend Doble Socet PVC Ø 6" x 90º Bh Tidak Ada - 1 422,300.00 422,300.00 422,300.00 422,300.00 422,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
497 Accessories Bend Doble Socet PVC Ø 4" x 11,5º Bh Tidak Ada - 1 139,200.00 139,200.00 139,200.00 139,200.00 139,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
498 Accessories Bend Doble Socet PVC Ø 4" x 22,5º Bh Tidak Ada - 1 148,400.00 148,400.00 148,400.00 148,400.00 148,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
499 Accessories Bend Doble Socet PVC Ø 4" x 45º Bh Tidak Ada - 1 160,700.00 160,700.00 160,700.00 160,700.00 160,700.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
500 Accessories Bend Doble Socet PVC Ø 4" x 90º Bh Tidak Ada - 1 174,800.00 174,800.00 174,800.00 174,800.00 174,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
501 Accessories Bend Doble Socet PVC Ø 3" x 22,5º Bh Tidak Ada - 1 89,600.00 89,600.00 89,600.00 89,600.00 89,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
502 Accessories Bend Doble Socet PVC Ø 3" x 45º Bh Tidak Ada - 1 102,000.00 102,000.00 102,000.00 102,000.00 102,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
503 Accessories Bend Doble Socet PVC Ø 3" x 90º Bh Tidak Ada - 1 114,800.00 114,800.00 114,800.00 114,800.00 114,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
504 Accessories Bend Doble Socet PVC Ø 2" x 22,5º Bh Tidak Ada - 1 45,900.00 45,900.00 45,900.00 45,900.00 45,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
505 Accessories Bend Doble Socet PVC Ø 2" x 45º Bh Tidak Ada - 1 49,600.00 49,600.00 49,600.00 49,600.00 49,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
506 Accessories Bend Doble Socet PVC Ø 2" x 90º Bh Tidak Ada - 1 56,000.00 56,000.00 56,000.00 56,000.00 56,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
507 Accessories Flanged Socket PVC RRJ Ø 2" Bh Tidak Ada - 1 177,900.00 177,900.00 177,900.00 177,900.00 177,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
508 Accessories Flanged Socket PVC RRJ Ø 3" Bh Tidak Ada - 1 245,000.00 245,000.00 245,000.00 245,000.00 245,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
509 Accessories Flanged Socket PVC RRJ Ø 4" Bh Tidak Ada - 1 323,100.00 323,100.00 323,100.00 323,100.00 323,100.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
510 Accessories Flanged Socket PVC RRJ Ø 6" Bh Tidak Ada - 1 596,000.00 596,000.00 596,000.00 596,000.00 596,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
511 Accessories Flanged Socket PVC RRJ Ø 8" Bh Tidak Ada - 1 960,200.00 960,200.00 960,200.00 960,200.00 960,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
512 Accessories Flanged Socket PVC RRJ Ø 10" Bh Tidak Ada - 1 985,000.00 985,000.00 985,000.00 985,000.00 985,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
513 Accessories Flanged Socket PVC RRJ Ø 12" Bh Tidak Ada - 1 1,499,400.00 1,499,400.00 1,499,400.00 1,499,400.00 1,499,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
514 Accessories Flanged Spigot PVC Ø 2" Bh Tidak Ada - 1 139,370.00 139,370.00 139,370.00 139,370.00 139,370.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
515 Accessories Flanged Spigot PVC Ø 3" Bh Tidak Ada - 1 192,940.00 192,940.00 192,940.00 192,940.00 192,940.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
516 Accessories Flanged Spigot PVC Ø 4" Bh Tidak Ada - 1 244,640.00 244,640.00 244,640.00 244,640.00 244,640.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
517 Accessories Flanged Spigot PVC Ø 6" Bh Tidak Ada - 1 479,820.00 479,820.00 479,820.00 479,820.00 479,820.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
518 Accessories Flanged Spigot PVC Ø 8" Bh Tidak Ada - 1 747,120.00 747,120.00 747,120.00 747,120.00 747,120.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
519 Accessories Flanged Spigot PVC Ø 12" Bh Tidak Ada - 1 1,108,030.00 1,108,030.00 1,108,030.00 1,108,030.00 1,108,030.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
520 Accessories Flanged Steel PN 10 Ø 2" Bh Tidak Ada - 1 89,100.00 89,100.00 89,100.00 89,100.00 89,100.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
521 Accessories Flanged Steel PN 10 Ø 3" Bh Tidak Ada - 1 118,800.00 118,800.00 118,800.00 118,800.00 118,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
522 Accessories Flanged Steel PN 10 Ø 4" Bh Tidak Ada - 1 165,000.00 165,000.00 165,000.00 165,000.00 165,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
523 Accessories Flanged Steel PN 10 Ø 6" Bh Tidak Ada - 1 237,600.00 237,600.00 237,600.00 237,600.00 237,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
524 Accessories Flanged Steel PN 10 Ø 8" Bh Tidak Ada - 1 316,800.00 316,800.00 316,800.00 316,800.00 316,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
525 Accessories Flanged Steel PN 10 Ø 10" Bh Tidak Ada - 1 380,160.00 380,160.00 380,160.00 380,160.00 380,160.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
526 Accessories Flanged Steel PN 10 Ø 12" Bh Tidak Ada - 1 475,200.00 475,200.00 475,200.00 475,200.00 475,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
527 Accessories Flanged Strainer CI Ø 3" Bh Tidak Ada - 1 1,265,000.00 1,265,000.00 1,265,000.00 1,265,000.00 1,265,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
528 Accessories Flanged Strainer CI Ø 4" Bh Tidak Ada - 1 1,650,000.00 1,650,000.00 1,650,000.00 1,650,000.00 1,650,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
529 Accessories Flanged Strainer CI Ø 6" Bh Tidak Ada - 1 2,040,500.00 2,040,500.00 2,040,500.00 2,040,500.00 2,040,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
530 Accessories Flanged Strainer CI Ø 8" Bh Tidak Ada - 1 2,310,000.00 2,310,000.00 2,310,000.00 2,310,000.00 2,310,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
531 Accessories Fleksible Joint "Tosen" Ø 4 Bh Tidak Ada - 1 1,425,600.00 1,425,600.00 1,425,600.00 1,425,600.00 1,425,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
532 Accessories Fleksible Joint "Tosen" Ø 6 Bh Tidak Ada - 1 1,782,000.00 1,782,000.00 1,782,000.00 1,782,000.00 1,782,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
533 Accessories Fleksible Joint "Tosen" Ø 8 Bh Tidak Ada - 1 2,138,400.00 2,138,400.00 2,138,400.00 2,138,400.00 2,138,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
534 Accessories Fleksible Joint "Tosen" Ø 10 Bh Tidak Ada - 1 2,566,080.00 2,566,080.00 2,566,080.00 2,566,080.00 2,566,080.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
535 Accessories Fleksible Joint "Tosen" Ø 12 Bh Tidak Ada - 1 3,079,296.00 3,079,296.00 3,079,296.00 3,079,296.00 3,079,296.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
536 Accessories Manhole 80 x 80 Cm. unit Tidak Ada - 1 495,000.00 495,000.00 495,000.00 495,000.00 495,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
537 Accessories Paking Karet Ø 2" Bh Tidak Ada - 1 26,620.00 26,620.00 26,620.00 26,620.00 26,620.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
538 Accessories Paking Karet Ø 3" Bh Tidak Ada - 1 31,460.00 31,460.00 31,460.00 31,460.00 31,460.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
539 Accessories Paking Karet Ø 4" Bh Tidak Ada - 1 47,190.00 47,190.00 47,190.00 47,190.00 47,190.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
540 Accessories Paking Karet Ø 6" Bh Tidak Ada - 1 66,000.00 66,000.00 66,000.00 66,000.00 66,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
541 Accessories Paking Karet Ø 8" Bh Tidak Ada - 1 104,500.00 104,500.00 104,500.00 104,500.00 104,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
542 Accessories Paking Karet Ø 10" Bh Tidak Ada - 1 123,750.00 123,750.00 123,750.00 123,750.00 123,750.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
543 Accessories Paking Karet Ø 12" Bh Tidak Ada - 1 143,000.00 143,000.00 143,000.00 143,000.00 143,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
544 Accessories DF Pipa GIP Ø 3" x 60 cm. Bh Tidak Ada - 1 455,400.00 455,400.00 455,400.00 455,400.00 455,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
545 Accessories DF Pipa GIP Ø 3" x 100 cm. Bh Tidak Ada - 1 667,920.00 667,920.00 667,920.00 667,920.00 667,920.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
546 Accessories Pressure Reducing Valve Ø 6" Bh Tidak Ada - 1 66,000,000.00 66,000,000.00 66,000,000.00 66,000,000.00 66,000,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
547 Accessories Repair Socket PVC Ø 2" Bh Tidak Ada - 1 104,500.00 104,500.00 104,500.00 104,500.00 104,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
548 Accessories Socket Repair PVC Ø 6" Bh Tidak Ada - 1 550,000.00 550,000.00 550,000.00 550,000.00 550,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
549 Accessories Rubber Expansiont Joint Ø 6" Bh Tidak Ada - 1 1,914,000.00 1,914,000.00 1,914,000.00 1,914,000.00 1,914,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
550 Accessories Rubber Water Stop 30 Cm Bh Tidak Ada - 1 429,000.00 429,000.00 429,000.00 429,000.00 429,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
551 Accessories Socket GIP Ø 2" Bh Tidak Ada - 1 55,000.00 55,000.00 55,000.00 55,000.00 55,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
552 Accessories Socket GIP Ø 3" Bh Tidak Ada - 1 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
553 Accessories Socket GIP Ø 4" Bh Tidak Ada - 1 92,400.00 92,400.00 92,400.00 92,400.00 92,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
554 Accessories Socket GIP Ø 6" Bh Tidak Ada - 1 253,000.00 253,000.00 253,000.00 253,000.00 253,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
555 Accessories Socket Reducer PVC (All RR) Ø 3" x 2" Bh Tidak Ada - 1 77,600.00 77,600.00 77,600.00 77,600.00 77,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
556 Accessories Socket Reducer PVC (All RR) Ø 4" x 3" Bh Tidak Ada - 1 131,600.00 131,600.00 131,600.00 131,600.00 131,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
557 Accessories Socket Reducer PVC (All RR) Ø 4" x 2" Bh Tidak Ada - 1 117,300.00 117,300.00 117,300.00 117,300.00 117,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
558 Accessories Socket Reducer PVC (All RR) Ø 6" x 3" Bh Tidak Ada - 1 202,800.00 202,800.00 202,800.00 202,800.00 202,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
559 Accessories Socket Reducer PVC (All RR) Ø 6" x 4" Bh Tidak Ada - 1 232,800.00 232,800.00 232,800.00 232,800.00 232,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
560 Accessories Socket Reducer PVC (All RR) Ø 8" x 6" Bh Tidak Ada - 1 523,200.00 523,200.00 523,200.00 523,200.00 523,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
561 Accessories Socket Reducer PVC (All RR) Ø 10" x 8" Bh Tidak Ada - 1 799,100.00 799,100.00 799,100.00 799,100.00 799,100.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
562 Accessories Socket Spigot Bend PVC Ø 12" X 90º Bh Tidak Ada - 1 3,880,800.00 3,880,800.00 3,880,800.00 3,880,800.00 3,880,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
563 Accessories Socket Spigot Bend PVC Ø 12" X 45º Bh Tidak Ada - 1 3,484,800.00 3,484,800.00 3,484,800.00 3,484,800.00 3,484,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
564 Accessories Socket Spigot Bend PVC Ø 12" X 22,5º Bh Tidak Ada - 1 2,822,160.00 2,822,160.00 2,822,160.00 2,822,160.00 2,822,160.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
565 Accessories Socket Spigot Bend PVC Ø 12" X 11,25º Bh Tidak Ada - 1 2,376,000.00 2,376,000.00 2,376,000.00 2,376,000.00 2,376,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
566 Accessories Socket Spigot Bend PVC Ø 8" x 22,5º Bh Tidak Ada - 1 982,423.20 982,423.20 982,423.20 982,423.20 982,423.20 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
567 Accessories Socket Spigot Bend PVC Ø 8" x 45º Bh Tidak Ada - 1 1,150,274.40 1,150,274.40 1,150,274.40 1,150,274.40 1,150,274.40 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
568 Accessories Socket Spigot Bend PVC Ø 8" x 90º Bh Tidak Ada - 1 1,323,062.40 1,323,062.40 1,323,062.40 1,323,062.40 1,323,062.40 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
569 Accessories Socket Spigot Bend PVC Ø 6" x 22,5º Bh Tidak Ada - 1 525,360.00 525,360.00 525,360.00 525,360.00 525,360.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
570 Accessories Socket Spigot Bend PVC Ø 6" x 45º Bh Tidak Ada - 1 615,120.00 615,120.00 615,120.00 615,120.00 615,120.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
571 Accessories Socket Spigot Bend PVC Ø 6" x 90º Bh Tidak Ada - 1 707,520.00 707,520.00 707,520.00 707,520.00 707,520.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
572 Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 22,5º Bh Tidak Ada - 1 241,560.00 241,560.00 241,560.00 241,560.00 241,560.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
573 Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 45º Bh Tidak Ada - 1 260,040.00 260,040.00 260,040.00 260,040.00 260,040.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
574 Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 90º Bh Tidak Ada - 1 289,080.00 289,080.00 289,080.00 289,080.00 289,080.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
575 Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 90º Bh Tidak Ada - 1 231,000.00 231,000.00 231,000.00 231,000.00 231,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
576 Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 45º Bh Tidak Ada - 1 204,600.00 204,600.00 204,600.00 204,600.00 204,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
577 Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 22,5º Bh Tidak Ada - 1 180,840.00 180,840.00 180,840.00 180,840.00 180,840.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
578 Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 90º Bh Tidak Ada - 1 136,950.00 136,950.00 136,950.00 136,950.00 136,950.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
579 Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 45º Bh Tidak Ada - 1 125,796.00 125,796.00 125,796.00 125,796.00 125,796.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
580 Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 22,5º Bh Tidak Ada - 1 112,200.00 112,200.00 112,200.00 112,200.00 112,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
581 Accessories Tangki Fiberglass 2 m³ unit Tidak Ada - 1 4,400,000.00 4,400,000.00 4,400,000.00 4,400,000.00 4,400,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
1 2 3 4 5 6 7 8 9 10 11 12 13 17 14 15 16 7 8 9 10 11 12
582 Accessories Tutup Manhole 0,80 x 0,80 unit Tidak Ada - 1 495,000.00 495,000.00 495,000.00 495,000.00 495,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
583 Accessories Tutup Manhole 1 x 0,80 unit Tidak Ada - 1 935,000.00 935,000.00 935,000.00 935,000.00 935,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
584 Accessories Socket Reducer HDPE Ø 10" x 8" Bh Tidak Ada - 1 990,200.00 990,200.00 990,200.00 990,200.00 990,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
585 Accessories Socket Reducer HDPE Ø 8" x 6" Bh Tidak Ada - 1 527,000.00 527,000.00 527,000.00 527,000.00 527,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
586 Accessories Socket Reducer HDPE Ø 6" x 4" Bh Tidak Ada - 1 361,300.00 361,300.00 361,300.00 361,300.00 361,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
587 Accessories Socket Reducer HDPE Ø 4" x 3" Bh Tidak Ada - 1 135,800.00 135,800.00 135,800.00 135,800.00 135,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
588 Accessories Socket Reducer HDPE Ø 3" x 2" Bh Tidak Ada - 1 102,600.00 102,600.00 102,600.00 102,600.00 102,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
589 Accessories Elbow With Thread HDPE Ø 10" x 90º Bh Tidak Ada - 1 1,482,900.00 1,482,900.00 1,482,900.00 1,482,900.00 1,482,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
590 Accessories Elbow With Thread HDPE Ø 8" x 90º Bh Tidak Ada - 1 931,400.00 931,400.00 931,400.00 931,400.00 931,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
591 Accessories Elbow With Thread HDPE Ø 6" x 90º Bh Tidak Ada - 1 764,000.00 764,000.00 764,000.00 764,000.00 764,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
592 Accessories Elbow With Thread HDPE Ø 4" x 90º Bh Tidak Ada - 1 375,900.00 375,900.00 375,900.00 375,900.00 375,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
593 Accessories Elbow With Thread HDPE Ø 3" x 90º Bh Tidak Ada - 1 305,900.00 305,900.00 305,900.00 305,900.00 305,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
594 Accessories Elbow With Thread HDPE Ø 2" x 90º Bh Tidak Ada - 1 183,000.00 183,000.00 183,000.00 183,000.00 183,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
595 Accessories Elbow Pushon Sistem Male HDPE Ø 1" x 90º Bh Tidak Ada - 1 49,400.00 49,400.00 49,400.00 49,400.00 49,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
596 Accessories Elbow Pushon Sistem Male HDPE Ø 3/4" x 90º Bh Tidak Ada - 1 36,800.00 36,800.00 36,800.00 36,800.00 36,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
597 Accessories Elbow Pushon Sistem Male HDPE Ø 1/2" x 90º x 25 Bh Tidak Ada - 1 29,400.00 29,400.00 29,400.00 29,400.00 29,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
598 Accessories Elbow Pushon Sistem Male HDPE Ø 1" x 90º x 20 Bh Tidak Ada - 1 27,200.00 27,200.00 27,200.00 27,200.00 27,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
599 Accessories Elbow Pushon Sistem Female HDPE Ø 3/4" x 90º x 25 Bh Tidak Ada - 1 23,600.00 23,600.00 23,600.00 23,600.00 23,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
600 Accessories Elbow Pushon Sistem Female HDPE Ø 1/2" x 90º x 20 Bh Tidak Ada - 1 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
601 Accessories Fitting Compression Push Fit Bh Tidak Ada - 1 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
602 Accessories Tee HDPE 90º Ø 10" Bh Tidak Ada - 1 1,199,300.00 1,199,300.00 1,199,300.00 1,199,300.00 1,199,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
603 Accessories Tee HDPE 90º Ø 8" Bh Tidak Ada - 1 833,400.00 833,400.00 833,400.00 833,400.00 833,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
604 Accessories Tee HDPE 90º Ø 6" Bh Tidak Ada - 1 653,600.00 653,600.00 653,600.00 653,600.00 653,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
605 Accessories Tee HDPE 90º Ø 4" Bh Tidak Ada - 1 424,800.00 424,800.00 424,800.00 424,800.00 424,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
606 Accessories Tee HDPE 90º Ø 3" Bh Tidak Ada - 1 362,900.00 362,900.00 362,900.00 362,900.00 362,900.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
607 Accessories Tee HDPE 90º Ø 2" Bh Tidak Ada - 1 263,400.00 263,400.00 263,400.00 263,400.00 263,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
608 Accessories Bend HDPE 90º Ø 12" Bh Tidak Ada - 1 1,710,720.00 1,710,720.00 1,710,720.00 1,710,720.00 1,710,720.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
609 Accessories Bend HDPE 90º Ø 8" Bh Tidak Ada - 1 829,950.00 829,950.00 829,950.00 829,950.00 829,950.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
610 Accessories Bend HDPE 90º Ø 6" Bh Tidak Ada - 1 680,680.00 680,680.00 680,680.00 680,680.00 680,680.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
611 Accessories Bend HDPE 90º Ø 4" Bh Tidak Ada - 1 334,950.00 334,950.00 334,950.00 334,950.00 334,950.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
612 Accessories Bend HDPE 90º Ø 3" Bh Tidak Ada - 1 272,580.00 272,580.00 272,580.00 272,580.00 272,580.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
613 Accessories Bend HDPE 90º Ø 2" Bh Tidak Ada - 1 163,020.00 163,020.00 163,020.00 163,020.00 163,020.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
614 Accessories Bend HDPE 45º Ø 10" Bh Tidak Ada - 1 1,146,420.00 1,146,420.00 1,146,420.00 1,146,420.00 1,146,420.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
615 Accessories Bend HDPE 45º Ø 8" Bh Tidak Ada - 1 645,260.00 645,260.00 645,260.00 645,260.00 645,260.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
616 Accessories Bend HDPE 45º Ø 6" Bh Tidak Ada - 1 521,400.00 521,400.00 521,400.00 521,400.00 521,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
617 Accessories Bend HDPE 45º Ø 4" Bh Tidak Ada - 1 272,250.00 272,250.00 272,250.00 272,250.00 272,250.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
618 Accessories Bend HDPE 45º Ø 3" Bh Tidak Ada - 1 189,310.00 189,310.00 189,310.00 189,310.00 189,310.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
619 Accessories Bend HDPE 45º Ø 2" Bh Tidak Ada - 1 112,090.00 112,090.00 112,090.00 112,090.00 112,090.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
620 Accessories Stub End HDPE Ø 10" Bh Tidak Ada - 1 1,088,600.00 1,088,600.00 1,088,600.00 1,088,600.00 1,088,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
621 Accessories Stub End HDPE Ø 8" Bh Tidak Ada - 1 744,800.00 744,800.00 744,800.00 744,800.00 744,800.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
622 Accessories Stub End HDPE Ø 6" Bh Tidak Ada - 1 475,300.00 475,300.00 475,300.00 475,300.00 475,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
623 Accessories Stub End HDPE Ø 4" Bh Tidak Ada - 1 269,600.00 269,600.00 269,600.00 269,600.00 269,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
624 Accessories Stub End HDPE Ø 3" Bh Tidak Ada - 1 218,100.00 218,100.00 218,100.00 218,100.00 218,100.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
625 Accessories Stub End HDPE Ø 2" Bh Tidak Ada - 1 149,300.00 149,300.00 149,300.00 149,300.00 149,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
626 Accessories Flange HDPE Ø 12" Bh Tidak Ada - 1 2,444,475.00 2,444,475.00 2,444,475.00 2,444,475.00 2,444,475.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
627 Accessories Flange HDPE Ø 8" Bh Tidak Ada - 1 901,395.00 901,395.00 901,395.00 901,395.00 901,395.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
628 Accessories Flange HDPE Ø 6" Bh Tidak Ada - 1 565,290.00 565,290.00 565,290.00 565,290.00 565,290.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
629 Accessories Flange HDPE Ø 4" Bh Tidak Ada - 1 366,685.00 366,685.00 366,685.00 366,685.00 366,685.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
630 Accessories Flange HDPE Ø 3" Bh Tidak Ada - 1 239,910.00 239,910.00 239,910.00 239,910.00 239,910.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
631 Accessories Flange HDPE Ø 2" Bh Tidak Ada - 1 146,685.00 146,685.00 146,685.00 146,685.00 146,685.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
632 Accessories Cap/Dop HDPE Ø 8" Bh Tidak Ada - 1 374,385.00 374,385.00 374,385.00 374,385.00 374,385.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
633 Accessories Cap/Dop HDPE Ø 6" Bh Tidak Ada - 1 191,510.00 191,510.00 191,510.00 191,510.00 191,510.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
634 Accessories Cap/Dop HDPE Ø 4" Bh Tidak Ada - 1 79,475.00 79,475.00 79,475.00 79,475.00 79,475.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
635 Accessories Cap/Dop HDPE Ø 3" Bh Tidak Ada - 1 27,170.00 27,170.00 27,170.00 27,170.00 27,170.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
636 Accessories Cap/Dop HDPE Ø 2" Bh Tidak Ada - 1 18,095.00 18,095.00 18,095.00 18,095.00 18,095.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
637 Accessories Cap/Dop HDPE Ø 1" Bh Tidak Ada - 1 17,160.00 17,160.00 17,160.00 17,160.00 17,160.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
638 Accessories Cap/Dop HDPE Ø 3/4" Bh Tidak Ada - 1 13,860.00 13,860.00 13,860.00 13,860.00 13,860.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
639 Accessories Cap/Dop HDPE Ø 1/2" Bh Tidak Ada - 1 9,570.00 9,570.00 9,570.00 9,570.00 9,570.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
640 Accessories Clamp Saddle 6" (160 mm) Bh Tidak Ada - 1 172,100.00 172,100.00 172,100.00 172,100.00 172,100.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
641 Accessories Clamp Saddle 4" (110 mm) Bh Tidak Ada - 1 103,600.00 103,600.00 103,600.00 103,600.00 103,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
642 Accessories Clamp Saddle 3" (90 mm) Bh Tidak Ada - 1 93,200.00 93,200.00 93,200.00 93,200.00 93,200.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
643 Accessories Clamp Saddle 2" (63 mm) Bh Tidak Ada - 1 57,600.00 57,600.00 57,600.00 57,600.00 57,600.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
644 Accessories Clamp Saddle 1½" (50 mm) Bh Tidak Ada - 1 45,300.00 45,300.00 45,300.00 45,300.00 45,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
645 Accessories Male thread adaptor (MTA) 1" (32 mm) Bh Tidak Ada - 1 44,990.00 44,990.00 44,990.00 44,990.00 44,990.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
646 Accessories Male thread adaptor (MTA) 3/4" (25 mm) Bh Tidak Ada - 1 34,650.00 34,650.00 34,650.00 34,650.00 34,650.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
647 Accessories Male thread adaptor (MTA) 1/2" (20 mm) Bh Tidak Ada - 1 28,050.00 28,050.00 28,050.00 28,050.00 28,050.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
648 Accessories Tap Kran Bh Tidak Ada - 1 18,000.00 18,000.00 18,000.00 18,000.00 18,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
649 Accessories Box Merer Cover Bh Tidak Ada - 1 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
650 Pompa Air Listrik; Suction 9 m; Head 40 m; kap. 35 l/min la Unit 550,000.00 2 11 140,000.00 965,000.00 544,444.44 550,000.00 550,000.00 H-Dominan 14% 77,500.00 472,500.00 590,630.00 475,000.00 - - 550,000.00 - -
651 Pompa Centrifugal; Head 100 m; kap. 11 l/dt la Unit Tidak Ada - 4 2,013,000.00 3,150,000.00 2,581,500.00 2,581,500.00 12,705,000.00 Penyesuaian 9% 1,155,000.00 12,705,000.00 11,550,000.00 14,437,500.00 - - - - - -
652 Pompa Tangan Dragon la Unit Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 324,845.00 0.00 11% 36,095.00 288,750.00 360,940.00 - - - - - -
653 Profil Tank Fiberglass orange kap. 1100 ltr. la Bh 1,250,000.00 3 13 1,100,000.00 1,600,000.00 1,299,090.91 1,250,000.00 1,732,500.00 Penyesuaian 9% 157,500.00 1,732,500.00 1,575,000.00 1,968,750.00 1,250,000.00 - 1,200,000.00 - 1,600,000.00 1,300,000.00
654 Profil Tank Fiberglass orange kap. 650 ltr. la Bh 850,000.00 6 14 445,000.00 1,100,000.00 877,083.33 850,000.00 1,129,018.00 Penyesuaian 9% 102,638.00 1,129,018.00 1,026,380.00 1,282,980.00 850,000.00 - 900,000.00 - 1,100,000.00 850,000.00
655 Shower Screen Fiber la Bh Tidak Ada - 5 50,000.00 158,000.00 94,333.33 94,333.33 2,887,500.00 Penyesuaian 9% 262,500.00 2,887,500.00 2,625,000.00 3,281,250.00 75,000.00 - - - - -
656 Shower Screen Kaca la Bh Tidak Ada - 3 250,000.00 250,000.00 250,000.00 250,000.00 4,042,500.00 Penyesuaian 9% 367,500.00 4,042,500.00 3,675,000.00 4,593,750.00 250,000.00 - - - - -
657 Stop Kran 1" la Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 88,595.00 0.00 11% 9,845.00 78,750.00 98,440.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
658 Stop Kran 1/2" la Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 41,345.00 0.00 11% 4,595.00 36,750.00 45,940.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
659 Stop Kran 2" la Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 183,275.00 0.00 11% 20,365.00 162,910.00 203,640.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
660 Stop Kran 3/4" la Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 70,875.00 0.00 11% 7,875.00 63,000.00 78,750.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
661 Submersible Deep Well Pump; Head 100 m; kap.1 HP la Unit Tidak Ada - 3 1,625,000.00 1,625,000.00 1,625,000.00 1,625,000.00 6,063,750.00 Penyesuaian 9% 551,250.00 6,063,750.00 5,512,500.00 6,890,630.00 - - - - - -
662 Submersible Deep Well Pump; Head 70 m; kap.2 HP la Unit Tidak Ada - 3 2,280,000.00 2,280,000.00 2,280,000.00 2,280,000.00 4,620,000.00 Penyesuaian 9% 420,000.00 4,620,000.00 4,200,000.00 5,250,000.00 - - - - - -
663 Urinoir Keramik Standar la Bh Tidak Ada - 3 1,350,000.00 1,350,000.00 1,350,000.00 1,350,000.00 1,583,505.00 Penyesuaian 9% 143,955.00 1,583,505.00 1,439,550.00 1,799,440.00 - - - - - -
664 Wastafel Gantung Keramik la Bh Tidak Ada - 4 350,000.00 650,000.00 500,000.00 500,000.00 638,110.00 Penyesuaian 9% 58,010.00 638,110.00 580,100.00 725,130.00 350,000.00 - - - - -
665 Box MCB ll Unit 5,000.00 4 8 4,000.00 10,000.00 5,666.67 5,000.00 40,425.00 Penyesuaian 9% 3,675.00 40,425.00 36,750.00 45,940.00 5,000.00 - - - - -
666 Down Light Warna 3" Setara Phillips ll Bh Tidak Ada - 2 31,000.00 114,000.00 72,500.00 72,500.00 41,151.00 Penyesuaian Tidak Ada Data #VALUE! 41,151.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
667 Down Light Warna 4" Setara Phillips ll Bh Tidak Ada - 2 47,000.00 189,000.00 118,000.00 118,000.00 118,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
668 Down Light Warna 5" Setara Phillips ll Bh Tidak Ada - 2 68,000.00 297,000.00 182,500.00 182,500.00 182,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
669 Down Light Warna 6" Setara Phillips ll Bh Tidak Ada - 1 575,000.00 575,000.00 575,000.00 575,000.00 575,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
670 Exhaust ll Bh Tidak Ada - 3 350,000.00 350,000.00 350,000.00 350,000.00 404,250.00 Penyesuaian 9% 36,750.00 404,250.00 367,500.00 459,380.00 350,000.00 - - - - -
671 Fetting ll Bh 15,000.00 3 7 12,000.00 15,000.00 13,900.00 15,000.00 8,865.00 0.00 11% 985.00 7,880.00 9,850.00 12,500.00 - - 15,000.00 - -
672 Genset 1300 W ll Bh Tidak Ada - 5 15,000.00 3,100,000.00 1,488,333.33 1,488,333.33 1,848,000.00 Penyesuaian 9% 168,000.00 1,848,000.00 1,680,000.00 2,100,000.00 - - - - - -
673 Genset 2000 W ll Bh Tidak Ada - 4 4,450,000.00 5,950,000.00 5,200,000.00 5,200,000.00 2,310,000.00 Penyesuaian 9% 210,000.00 2,310,000.00 2,100,000.00 2,625,000.00 - - - - - -
674 Genset 2500 W ll Bh Tidak Ada - 3 4,700,000.00 4,700,000.00 4,700,000.00 4,700,000.00 3,349,500.00 Penyesuaian 9% 304,500.00 3,349,500.00 3,045,000.00 3,806,250.00 - - - - - -
675 Genset 5000 W ll Bh Tidak Ada - 4 8,275,000.00 12,850,000.00 10,562,500.00 10,562,500.00 6,930,000.00 Penyesuaian 9% 630,000.00 6,930,000.00 6,300,000.00 7,875,000.00 - - - - - -
676 Genset 6000 W ll Bh Tidak Ada - 4 9,100,000.00 16,927,000.00 13,013,500.00 13,013,500.00 7,507,500.00 Penyesuaian 9% 682,500.00 7,507,500.00 6,825,000.00 8,531,250.00 - - - - - -
677 Genset 900 W ll Bh Tidak Ada - 4 2,070,000.00 2,375,000.00 2,222,500.00 2,222,500.00 1,039,500.00 Penyesuaian 9% 94,500.00 1,039,500.00 945,000.00 1,181,250.00 - - - - - -
678 Kabel Ravo 2x1,5 mm2 ll M¹ 8,000.00 2 9 7,000.00 325,000.00 93,971.43 8,000.00 8,000.00 H-Dominan 2% 120.00 7,880.00 9,850.00 325,000.00 - 7,500.00 8,000.00 - -
679 Kabel Ravo 2x2,5 mm2 ll M¹ 10,000.00 2 9 9,000.00 445,000.00 128,471.43 10,000.00 10,000.00 H-Dominan 11% 1,070.00 8,930.00 11,160.00 445,000.00 - 10,000.00 11,000.00 - -
1 2 3 4 5 6 7 8 9 10 11 12 13 17 14 15 16 7 8 9 10 11 12
680 Lampu Downlight 4' ll Bh Tidak Ada - 3 43,000.00 43,000.00 43,000.00 43,000.00 69,300.00 Penyesuaian 9% 6,300.00 69,300.00 63,000.00 78,750.00 - - - - - -
681 Lampu Neon SL 15 Watt Setara Phillips ll Bh Tidak Ada - 1 30,000.00 30,000.00 30,000.00 30,000.00 34,650.00 Penyesuaian Tidak Ada Data #VALUE! 34,650.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
682 Lampu Neon SL 18 Watt Setara Phillips ll Bh Tidak Ada - 2 19,500.00 21,000.00 20,250.00 20,250.00 37,543.00 Penyesuaian Tidak Ada Data #VALUE! 37,543.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
683 Lampu Pijar 100 Watt Setara Phillips ll Bh Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 37,500.00 Penyesuaian Tidak Ada Data #VALUE! 37,500.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
684 Lampu Pijar 25 Watt Setara Phillips ll Bh Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 27,500.00 Penyesuaian Tidak Ada Data #VALUE! 27,500.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
685 Lampu Pijar 40 Watt Setara Phillips ll Bh Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 33,750.00 Penyesuaian Tidak Ada Data #VALUE! 33,750.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
686 Lampu Pijar 60 Watt Setara Phillips ll Bh Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 65,000.00 Penyesuaian Tidak Ada Data #VALUE! 65,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
687 Lampu TL (Neon) 10 Watt (komplet) Setara Phillips ll Bh Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 51,975.00 Penyesuaian Tidak Ada Data #VALUE! 51,975.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
688 Lampu TL (Neon) 20 Watt (komplet) Setara Phillips ll Bh Tidak Ada - 1 79,000.00 79,000.00 79,000.00 79,000.00 86,625.00 Penyesuaian Tidak Ada Data #VALUE! 86,625.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
689 Lampu TL (Neon) 40 Watt (komplet) Setara Phillips ll Bh Tidak Ada - 1 96,000.00 96,000.00 96,000.00 96,000.00 101,068.00 Penyesuaian Tidak Ada Data #VALUE! 101,068.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
690 Main Distribusi Panel (PDM) ll Unit Tidak Ada - 3 17,500.00 17,500.00 17,500.00 17,500.00 3,250.00 0.00 11% 360.00 2,890.00 3,610.00 - - - - - -
691 Saklar Ganda ll Bh 17,000.00 2 14 6,300.00 25,000.00 17,691.67 17,000.00 17,000.00 H-Dominan -24% -4,000.00 21,000.00 26,250.00 17,000.00 - 25,000.00 - - 17,000.00
692 Saklar Stopkontak ll Bh 20,000.00 3 14 6,300.00 25,000.00 17,775.00 20,000.00 28,875.00 Penyesuaian 9% 2,625.00 28,875.00 26,250.00 32,810.00 20,000.00 - 25,000.00 22,000.00 - 13,500.00
693 Saklar Tunggal ll Bh 12,500.00 2 13 5,000.00 25,000.00 13,500.00 12,500.00 17,325.00 Penyesuaian 9% 1,575.00 17,325.00 15,750.00 19,690.00 13,500.00 - 15,000.00 - - 12,500.00
694 Sekring Automatik ll Bh Tidak Ada - 3 9,800.00 9,800.00 9,800.00 9,800.00 28,875.00 Penyesuaian 9% 2,625.00 28,875.00 26,250.00 32,810.00 - - - - - -
695 Stop Kontak ll Bh 15,000.00 3 11 13,000.00 25,000.00 17,555.56 15,000.00 17,325.00 Penyesuaian 9% 1,575.00 17,325.00 15,750.00 19,690.00 15,000.00 - 20,000.00 20,000.00 - -
696 Alumunium foil lt M² Tidak Ada - 3 28,000.00 28,000.00 28,000.00 28,000.00 57,750.00 Penyesuaian 9% 5,250.00 57,750.00 52,500.00 65,630.00 - - - - - -
697 Carpet lt M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 76,780.00 0.00 11% 8,530.00 68,250.00 85,310.00 - - - - - -
698 Carpet 80% wool, 20% nylon lt M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 94,500.00 0.00 11% 10,500.00 84,000.00 105,000.00 - - - - - -
699 Feltex carpet 100% wool T-21 lt M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 194,905.00 0.00 11% 21,655.00 173,250.00 216,560.00 - - - - - -
700 Floor hardener lt Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 32,490.00 0.00 11% 3,610.00 28,880.00 36,100.00 - - - - - -
701 Gymfloor lt M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 340,000.00 0.00 63% 214,000.00 126,000.00 157,500.00 - - - - - -
702 Lem vinyil lt Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 32,490.00 0.00 11% 3,610.00 28,880.00 36,100.00 - - - - - -
703 Lt vinyl karet 30x30 kwl II lt M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 100,405.00 0.00 11% 11,155.00 89,250.00 111,560.00 - - - - - -
704 Lt vinyl karet 30x30 kwl l lt M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 94,500.00 0.00 11% 10,500.00 84,000.00 105,000.00 - - - - - -
705 Parquet jati lt M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 350,000.00 0.00 46% 161,000.00 189,000.00 236,250.00 - - - - - -
706 Underlyer tebal 6 mm/rubber corrugated lt M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 200,815.00 0.00 11% 22,315.00 178,500.00 223,130.00 - - - - - -
707 Vinyil lt Lbr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 32,490.00 0.00 11% 3,610.00 28,880.00 36,100.00 - - - - - -
708 Vinyil asbes lt Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 14,770.00 0.00 11% 1,640.00 13,130.00 16,410.00 - - - - - -
709 Vinyil motif kembang Ex DN lt Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 20,680.00 0.00 11% 2,300.00 18,380.00 22,980.00 - - - - - -
710 Vinyil wall covering lebar 50 cm lt M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 118,125.00 0.00 11% 13,125.00 105,000.00 131,250.00 - - - - - -
711 Wallpaper lt M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 135,845.00 0.00 11% 15,095.00 120,750.00 150,940.00 - - - - - -
712 Jendela besi pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 885,940.00 0.00 11% 98,440.00 787,500.00 984,380.00 - - - - - -
713 Jendela besi tahan api pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,063,125.00 0.00 11% 118,125.00 945,000.00 1,181,250.00 - - - - - -
714 Kaca Buram 12 mm pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 354,375.00 0.00 11% 39,375.00 315,000.00 393,750.00 - - - - - -
715 Kaca Buram 5 mm pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 206,720.00 0.00 11% 22,970.00 183,750.00 229,690.00 - - - - - -
716 Kaca cermin tebal 5 mm pj M² Tidak Ada - 3 300,000.00 300,000.00 300,000.00 300,000.00 189,000.00 0.00 11% 21,000.00 168,000.00 210,000.00 - - - - - -
717 Kaca cermin tebal 8 mm pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 236,250.00 0.00 11% 26,250.00 210,000.00 262,500.00 - - - - - -
718 Kaca patri pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 354,375.00 0.00 11% 39,375.00 315,000.00 393,750.00 - - - - - -
719 Kaca Polos 3 mm pj M² Tidak Ada - 4 115,000.00 135,000.00 125,000.00 125,000.00 125,000.00 H-Rata rata 16% 20,000.00 105,000.00 131,250.00 - - - - - -
720 Kaca Polos 5 mm pj M² 150,000.00 2 4 150,000.00 150,000.00 150,000.00 150,000.00 179,025.00 Penyesuaian 9% 16,275.00 179,025.00 162,750.00 203,440.00 - - - - - -
721 Kaca Polos 8 mm pj M² Tidak Ada - 3 450,000.00 450,000.00 450,000.00 450,000.00 189,000.00 0.00 11% 21,000.00 168,000.00 210,000.00 - - - - - -
722 Kaca Ray-Band 5 mm pj M² Tidak Ada - 4 150,000.00 170,000.00 160,000.00 160,000.00 184,800.00 Penyesuaian 9% 16,800.00 184,800.00 168,000.00 210,000.00 - - - - - -
723 Kaca wireglass pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 177,190.00 0.00 11% 19,690.00 157,500.00 196,880.00 - - - - - -
724 Kawat burung pj M² Tidak Ada - 5 20,000.00 110,000.00 50,833.33 50,833.33 20,680.00 0.00 11% 2,300.00 18,380.00 22,980.00 - - - - - -
725 Kawat Harmonika pj M² Tidak Ada - 4 25,000.00 450,000.00 237,500.00 237,500.00 36,910.00 0.00 11% 4,100.00 32,810.00 41,010.00 - - - - - -
726 Kawat Nyamuk/Kasa Logam pj M² 20,000.00 2 7 20,000.00 25,000.00 22,500.00 20,000.00 20,000.00 H-Dominan 2% 310.00 19,690.00 24,610.00 20,000.00 - - - - -
727 Kawat Nyamuk/Kasa Plastik pj M² 25,000.00 3 9 10,000.00 25,000.00 20,357.14 25,000.00 17,720.00 0.00 11% 1,970.00 15,750.00 19,690.00 20,000.00 - 10,000.00 - - -
728 Naco (Kerangka dan Daun) pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 472,500.00 0.00 11% 52,500.00 420,000.00 525,000.00 - - - - - -
729 Pintu besi baja pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 413,440.00 0.00 11% 45,940.00 367,500.00 459,380.00 - - - - - -
730 Pintu lipat pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 885,940.00 0.00 11% 98,440.00 787,500.00 984,380.00 - - - - - -
731 Plastik Filter pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 11,815.00 0.00 11% 1,315.00 10,500.00 13,130.00 - - - - - -
732 Sunscreen alumunium pj M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 147,655.00 0.00 11% 16,405.00 131,250.00 164,060.00 - - - - - -
733 Door closer pja Bh Tidak Ada - 3 150,000.00 150,000.00 150,000.00 150,000.00 866,250.00 Penyesuaian 9% 78,750.00 866,250.00 787,500.00 984,380.00 - - - 150,000.00 - -
734 Door holder pja Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 295,315.00 0.00 11% 32,815.00 262,500.00 328,130.00 - - - - - -
735 Door Stop pja Bh Tidak Ada - 4 27,500.00 55,000.00 41,250.00 41,250.00 57,750.00 Penyesuaian 9% 5,250.00 57,750.00 52,500.00 65,630.00 - - - 55,000.00 - -
736 Engsel (setara solid) 3" pja Bh 15,000.00 4 13 5,000.00 150,000.00 31,109.09 15,000.00 23,100.00 Penyesuaian 9% 2,100.00 23,100.00 21,000.00 26,250.00 20,000.00 - - - 15,000.00 15,000.00
737 Engsel (setara solid) 4" pja Bh 20,000.00 3 12 7,000.00 96,000.00 29,030.00 20,000.00 40,425.00 Penyesuaian 9% 3,675.00 40,425.00 36,750.00 45,940.00 25,000.00 - - - 20,000.00 20,000.00
738 Engsel Biasa 2 1/2" pja Bh 10,000.00 2 10 6,500.00 22,500.00 11,625.00 10,000.00 8,865.00 0.00 11% 985.00 7,880.00 9,850.00 12,500.00 - 10,000.00 10,000.00 8,500.00 -
739 Engsel Biasa 3" pja Bh 10,000.00 4 13 6,000.00 19,000.00 10,972.73 10,000.00 11,550.00 Penyesuaian 9% 1,050.00 11,550.00 10,500.00 13,130.00 15,000.00 - 12,000.00 15,000.00 10,000.00 -
740 Engsel Lokal Besar pja Bh Tidak Ada - 5 20,000.00 39,500.00 31,833.33 31,833.33 31,833.33 H-Rata rata 18% 5,583.33 26,250.00 32,810.00 - - - - - -
741 Engsel Nylon Arch 3" pja Bh Tidak Ada - 3 8,000.00 8,000.00 8,000.00 8,000.00 14,058.00 Penyesuaian 9% 1,278.00 14,058.00 12,780.00 15,980.00 - - - - - -
742 Espagnolet pja Set Tidak Ada - 4 25,000.00 125,000.00 75,000.00 75,000.00 173,250.00 Penyesuaian 9% 15,750.00 173,250.00 157,500.00 196,880.00 - - - - - -
743 Formica pja Lbr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 82,690.00 0.00 11% 9,190.00 73,500.00 91,880.00 - - - - - -
744 Grendel (setara solid) pja Bh 5,000.00 2 12 5,000.00 49,500.00 15,750.00 5,000.00 25,993.00 Penyesuaian 9% 2,363.00 25,993.00 23,630.00 29,540.00 7,500.00 - - 15,000.00 6,500.00 -
745 Grendel Lokal Besar pja Bh 10,000.00 2 10 3,000.00 56,000.00 21,250.00 10,000.00 20,218.00 Penyesuaian 9% 1,838.00 20,218.00 18,380.00 22,980.00 35,000.00 - 5,000.00 10,000.00 - -
746 Hak Angin Biasa pja Bh 5,000.00 5 15 2,000.00 21,000.00 7,538.46 5,000.00 5,775.00 Penyesuaian 9% 525.00 5,775.00 5,250.00 6,560.00 7,500.00 - 5,000.00 15,000.00 5,000.00 5,000.00
747 Kait angin pja Bh 3,000.00 2 7 3,000.00 15,000.00 7,000.00 3,000.00 20,218.00 Penyesuaian 9% 1,838.00 20,218.00 18,380.00 22,980.00 - - - - - -
748 Kosen + Pintu PVC pja Bh 250,000.00 3 12 225,000.00 300,000.00 248,500.00 250,000.00 404,250.00 Penyesuaian 9% 36,750.00 404,250.00 367,500.00 459,380.00 235,000.00 - 250,000.00 300,000.00 255,000.00 250,000.00
749 Kunci lemari pja Bh 15,000.00 6 17 5,000.00 45,000.00 15,800.00 15,000.00 28,875.00 Penyesuaian 9% 2,625.00 28,875.00 26,250.00 32,810.00 14,000.00 - 16,000.00 15,000.00 15,000.00 15,000.00
750 Kunci Pintu Master (setara solid) pja Bh Tidak Ada - 9 30,000.00 150,000.00 101,000.00 101,000.00 259,875.00 Penyesuaian 9% 23,625.00 259,875.00 236,250.00 295,310.00 150,000.00 - - - 110,000.00 -
751 Kunci Selot pja Bh 6,000.00 2 13 5,000.00 35,000.00 18,045.45 6,000.00 34,650.00 Penyesuaian 9% 3,150.00 34,650.00 31,500.00 39,380.00 10,000.00 - 6,000.00 30,000.00 - -
752 Kunci Silinder Putar pja Bh 30,000.00 2 9 22,000.00 73,000.00 45,000.00 30,000.00 86,625.00 Penyesuaian 9% 7,875.00 86,625.00 78,750.00 98,440.00 50,000.00 - - 30,000.00 - -
753 Kunci Tanam 2 Slag pja Bh 30,000.00 2 12 30,000.00 185,000.00 99,000.00 30,000.00 167,475.00 Penyesuaian 9% 15,225.00 167,475.00 152,250.00 190,310.00 30,000.00 - 185,000.00 50,000.00 85,000.00 -
754 Kunci Tanam 3 Slag pja Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 236,250.00 0.00 11% 26,250.00 210,000.00 262,500.00 - - - - - -
755 Kunci Tanam Biasa pja Bh Tidak Ada - 6 15,000.00 77,000.00 46,750.00 46,750.00 86,625.00 Penyesuaian 9% 7,875.00 86,625.00 78,750.00 98,440.00 - - - - - -
756 Pegangan pintu biasa pja Bh Tidak Ada - 10 3,500.00 160,000.00 58,000.00 58,000.00 58,000.00 H-Rata rata 9% 5,500.00 52,500.00 65,630.00 42,500.00 - 3,500.00 - 75,000.00 -
757 Pintu alumunium pja M² 300,000.00 3 9 300,000.00 925,000.00 407,142.86 300,000.00 300,000.00 H-Dominan 4% 11,250.00 288,750.00 360,940.00 300,000.00 - - 300,000.00 - -
758 Rol pintu dorong pja Bh Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 94,500.00 0.00 11% 10,500.00 84,000.00 105,000.00 - - - - - -
759 Sealent pja Kg 27,500.00 2 5 27,500.00 30,000.00 28,333.33 27,500.00 97,020.00 Penyesuaian 9% 8,820.00 97,020.00 88,200.00 110,250.00 - - - - - 27,500.00
760 Tarikan Pintu (setara solid) 10" pja Psg 150,000.00 2 10 60,000.00 221,000.00 132,550.00 150,000.00 150,000.00 H-Dominan 20% 29,250.00 120,750.00 150,940.00 150,000.00 - - 150,000.00 - -
761 Tarikan Pintu (setara solid) 15" pja Psg Tidak Ada - 7 75,000.00 286,000.00 159,400.00 159,400.00 288,750.00 Penyesuaian 9% 26,250.00 288,750.00 262,500.00 328,130.00 185,000.00 - - - - -
762 Tarikan Pintu (setara solid) 20" pja Psg Tidak Ada - 7 7,500.00 310,000.00 140,700.00 140,700.00 462,000.00 Penyesuaian 9% 42,000.00 462,000.00 420,000.00 525,000.00 7,500.00 - - - - -
763 Venetion blinds pja M² Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 70,875.00 0.00 11% 7,875.00 63,000.00 78,750.00 - - - - - -
764 Bambu / Dolken pla Btg Tidak Ada - 3 17,500.00 17,500.00 17,500.00 17,500.00 14,770.00 0.00 11% 1,640.00 13,130.00 16,410.00 - - - - - -
765 Gypsum 12 mm pla Lbr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 118,125.00 0.00 11% 13,125.00 105,000.00 131,250.00 - - - - - -
766 Gypsum 9 mm pla Lbr 75,000.00 4 14 65,000.00 85,000.00 73,791.67 75,000.00 75,000.00 H-Dominan 16% 12,000.00 63,000.00 78,750.00 75,000.00 - - 75,000.00 75,000.00 -
767 Kayu Profil 3/3 pla Ujg 11,000.00 2 7 10,000.00 15,000.00 11,800.00 11,000.00 12,705.00 Penyesuaian 9% 1,155.00 12,705.00 11,550.00 14,440.00 11,000.00 - - - - -
768 Kayu Profil 3/8 pla Ujg Tidak Ada - 4 12,500.00 14,000.00 13,250.00 13,250.00 13,250.00 H-Rata rata 5% 650.00 12,600.00 15,750.00 - - - - - -
769 List Profil pla M' 12,500.00 2 5 12,500.00 15,000.00 13,333.33 12,500.00 5,905.00 0.00 11% 655.00 5,250.00 6,560.00 - - - - - -
770 List Profil Gypsum pla M' Tidak Ada - 3 27,500.00 27,500.00 27,500.00 27,500.00 27,500.00 H-Rata rata 5% 1,250.00 26,250.00 32,810.00 - - - - - -
771 Lumbressering pla Ujg 15,000.00 4 9 15,000.00 130,000.00 31,928.57 15,000.00 20,218.00 Penyesuaian 9% 1,838.00 20,218.00 18,380.00 22,980.00 15,000.00 - - - 16,000.00 -
772 Metal Furing (Rangka Plafond) pla Ujg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 35,440.00 0.00 11% 3,940.00 31,500.00 39,380.00 - - - - - -
773 Multipleks 4 mm pla Lbr 70,000.00 5 15 60,000.00 73,000.00 68,500.00 70,000.00 70,000.00 H-Dominan 18% 12,250.00 57,750.00 72,190.00 70,000.00 - - 60,000.00 65,000.00 70,000.00
774 Multipleks 6 mm pla Lbr 85,000.00 5 17 78,000.00 90,000.00 84,133.33 85,000.00 85,000.00 H-Dominan 1% 1,000.00 84,000.00 105,000.00 85,000.00 80,000.00 90,000.00 85,000.00 80,000.00 82,500.00
775 Multipleks 9 mm pla Lbr 135,000.00 8 19 13,500.00 142,000.00 124,705.88 135,000.00 135,000.00 H-Dominan 14% 19,500.00 115,500.00 144,380.00 135,000.00 135,000.00 128,000.00 135,000.00 135,000.00 132,500.00
776 Plywood 3 mm pla Lbr 95,000.00 3 12 70,000.00 95,000.00 85,300.00 95,000.00 95,000.00 H-Dominan 14% 13,620.00 81,380.00 101,730.00 82,500.00 - 85,000.00 - 82,500.00 -
777 Plywood 4 mm pla Lbr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 100,405.00 0.00 11% 11,155.00 89,250.00 111,560.00 - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 17 14 15 16 7 8 9 10 11 12
778 Plywood 6 mm pla Lbr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 106,315.00 0.00 11% 11,815.00 94,500.00 118,130.00 - - - - - -
779 Softboard pla Lbr Tidak Ada - 4 222,000.00 247,000.00 234,500.00 234,500.00 70,875.00 0.00 11% 7,875.00 63,000.00 78,750.00 - - - - - -
780 Teakwood 3x7 pla Lbr Tidak Ada - 9 61,000.00 115,000.00 77,071.43 77,071.43 103,950.00 Penyesuaian 9% 9,450.00 103,950.00 94,500.00 118,130.00 70,000.00 - - 115,000.00 - 67,500.00
781 Teakwood 4x8 pla Lbr 80,000.00 3 10 55,000.00 125,000.00 84,625.00 80,000.00 115,500.00 Penyesuaian 9% 10,500.00 115,500.00 105,000.00 131,250.00 80,000.00 - - 125,000.00 - 80,000.00
782 Tripleks 3 mm pla Lbr 52,000.00 4 18 50,000.00 56,000.00 53,031.25 52,000.00 52,000.00 H-Dominan 9% 4,750.00 47,250.00 59,060.00 53,500.00 - 52,000.00 55,000.00 51,000.00 53,000.00
783 Tripleks 4 mm pla Lbr 70,000.00 4 15 65,000.00 74,000.00 69,192.31 70,000.00 70,000.00 H-Dominan 14% 9,620.00 60,380.00 75,480.00 70,000.00 - - 68,000.00 65,000.00 70,000.00
784 Tripleks 6 mm pla Lbr 85,000.00 4 14 77,500.00 90,000.00 83,250.00 85,000.00 85,000.00 H-Dominan 4% 3,620.00 81,380.00 101,730.00 85,000.00 - 90,000.00 85,000.00 80,000.00 82,500.00
785 Lem Kayu z Kg 15,000.00 4 14 10,000.00 28,500.00 18,083.33 15,000.00 40,425.00 Penyesuaian 9% 3,675.00 40,425.00 36,750.00 45,940.00 26,500.00 - 28,500.00 20,000.00 25,000.00 -
786 Glass Bit z Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 41,580.00 0.00 11% 4,620.00 36,960.00 46,200.00 - - - - - -
787 Sabun z Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 17,720.00 0.00 11% 1,970.00 15,750.00 19,690.00 - - - - - -
788 Polimer Kg Tidak Ada - 3 45,000.00 45,000.00 45,000.00 45,000.00 51,975.00 Penyesuaian 9% 4,725.00 51,975.00 47,250.00 59,060.00
789 Cat Anti Karat Kg Tidak Ada - 3 188,000.00 188,000.00 188,000.00 188,000.00 43,360.00 0.00 11% 4,820.00 38,540.00 48,180.00
790 Genteng Onduline Lbr Tidak Ada - 1 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
791 Stop Kran 1" PVC Bh Tidak Ada - 2 15,800.00 95,000.00 55,400.00 55,400.00 55,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
792 Stop Kran 1/2" Besi Bh Tidak Ada - 2 42,000.00 43,000.00 42,500.00 42,500.00 42,500.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
793 Stop Kran 2" PVC Bh Tidak Ada - 2 17,900.00 112,000.00 64,950.00 64,950.00 64,950.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
794 Stop Kran 3/4" Besi Bh Tidak Ada - 2 61,000.00 63,600.00 62,300.00 62,300.00 62,300.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
795 Lampu Taman Kecil Bh Tidak Ada - 1 220,400.00 220,400.00 220,400.00 220,400.00 220,400.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
796 Lampu Taman Sedang Bh Tidak Ada - 1 526,000.00 526,000.00 526,000.00 526,000.00 526,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
797 Lampu Taman Besar Bh Tidak Ada - 1 1,236,000.00 1,236,000.00 1,236,000.00 1,236,000.00 1,236,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
798 Poliurythane M2 Tidak Ada - 2 185,000.00 197,000.00 191,000.00 191,000.00 191,000.00 H-Rata rata Tidak Ada Data #VALUE! Cek_Item Cek_Item
799 Agregat Pecah Mesin 0-5 mm M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 643,130.00 H-14 0% 0.00 643,130.00 643,130.00 803,910.00
800 Agregat Pecah Mesin 20-30 mm M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 511,880.00 H-14 0% 0.00 511,880.00 511,880.00 639,850.00
801 Agregat Pecah Mesin 50-70 mm M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 459,380.00 H-14 0% 0.00 459,380.00 459,380.00 574,230.00
802 Agregat Pecah Mesin 5-10 & 10-20 mm M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 538,130.00 H-14 0% 0.00 538,130.00 538,130.00 672,660.00
803 Anchorage buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,573,425.00 0.00 11% 174,825.00 1,398,600.00 1,748,250.00
804 Anti strpping agent liter Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 59,065.00 0.00 11% 6,565.00 52,500.00 65,630.00
805 Arbocell Kg. Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 37,800.00 0.00 11% 4,200.00 33,600.00 42,000.00
806 Asbuton Halus Ton Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 7,017,805.00 0.00 11% 779,755.00 6,238,050.00 7,797,560.00
807 Asbuton yang diproses Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 70,180.00 0.00 11% 7,800.00 62,380.00 77,980.00
808 Aspal Emulsi Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 6,505.00 0.00 11% 725.00 5,780.00 7,230.00
809 Assetilline Botol Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 271,105.00 0.00 11% 30,125.00 240,980.00 301,230.00
810 Bahan Modifikasi Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,180.00 0.00 11% 130.00 1,050.00 1,310.00
811 Bahan pengawet: kreosot liter Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 5,905.00 0.00 11% 655.00 5,250.00 6,560.00
812 Bahan Pengisi (Filler) Tambahan Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,420.00 0.00 11% 160.00 1,260.00 1,580.00
813 Baja Bergelombang Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 12,815.00 0.00 11% 1,425.00 0.00 11,390.00 14,240.00
814 Baja Prategang Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 14,175.00 0.00 11% 1,575.00 12,600.00 15,750.00
815 Batu Bara Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 710.00 0.00 11% 80.00 630.00 790.00
816 Batu Belah / Kerakal M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 223,255.00 0.00 11% 24,805.00 198,450.00 248,060.00
817 Bunker Oil Liter Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 2,690.00 0.00 11% 300.00 2,390.00 2,990.00
818 Casing M2 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 29,530.00 0.00 11% 3,280.00 26,250.00 32,810.00
819 Cerucuk M Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 17,720.00 0.00 11% 1,970.00 15,750.00 19,690.00
820 Curing Compound Ltr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 45,485.00 0.00 11% 5,055.00 40,430.00 50,540.00
821 Ducting (Kabel prestress) M' Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 177,190.00 0.00 11% 19,690.00 157,500.00 196,880.00
822 Ducting (Strand prestress) M' Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 59,065.00 0.00 11% 6,565.00 52,500.00 65,630.00
823 Elastomer Alam Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 53,155.00 0.00 11% 5,905.00 47,250.00 59,060.00
824 Elastomer jenis 1 buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 500,905.00 0.00 11% 55,655.00 445,250.00 556,560.00
825 Elastomer jenis 2 buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 844,595.00 0.00 11% 93,845.00 750,750.00 938,440.00
826 Elastomer jenis 3 buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,088,875.00 0.00 11% 120,985.00 967,890.00 1,209,860.00
827 Elastomer Sintesis Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 53,155.00 0.00 11% 5,905.00 47,250.00 59,060.00
828 Expansion Cap M2 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 7,145.00 0.00 11% 795.00 6,350.00 7,940.00
829 Expansion Join Baja Siku M Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 324,845.00 0.00 11% 36,095.00 288,750.00 360,940.00
830 Expansion Join Tipe Rubber M Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,417,500.00 0.00 11% 157,500.00 1,260,000.00 1,575,000.00
831 Expansion Joint Tipe Torma M1 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,417,500.00 0.00 11% 157,500.00 1,260,000.00 1,575,000.00
832 Expansion Tipe Joint Asphaltic Plug M Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,215,270.00 0.00 11% 135,030.00 1,080,240.00 1,350,300.00
833 Gravel M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 282,660.00 H-14 0% 0.00 282,660.00 282,660.00 353,330.00
834 Joint Sealent Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 40,285.00 0.00 11% 4,475.00 35,810.00 44,760.00
835 Joint Socket Pile 16x16x16 Set Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 79,740.00 0.00 11% 8,860.00 70,880.00 88,600.00
836 Joint Socket Pile 35x35 Set Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 717,615.00 0.00 11% 79,735.00 637,880.00 797,350.00
837 Kapur M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 47,250.00 0.00 11% 5,250.00 42,000.00 52,500.00
838 Kerb jenis 1 Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 53,155.00 0.00 11% 5,905.00 47,250.00 59,060.00
839 Kerb jenis 2 Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 59,065.00 0.00 11% 6,565.00 52,500.00 65,630.00
840 Kerb jenis 3 Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 64,970.00 0.00 11% 7,220.00 57,750.00 72,190.00
841 Kerb Type A Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 53,155.00 0.00 11% 5,905.00 47,250.00 59,060.00
842 Mikro Pile 16x16x16 M1 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 71,765.00 0.00 11% 7,975.00 63,790.00 79,740.00
843 Mini Timber Pile Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 31,895.00 0.00 11% 3,545.00 28,350.00 35,440.00
844 Minyak Fluks Liter 2,394.00 2 2 0.00 0.00 Tdk Ada Data 2,394.00 2,394.00 H-Dominan 0% 0.00 2,394.00 2,394.00
845 Oxygen Botol Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 135,550.00 0.00 11% 15,060.00 120,490.00 150,610.00
846 Additive Ltr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 45,485.00 0.00 11% 5,055.00 40,430.00 50,540.00
847 Bahan Agr.Base Kelas C2 M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 97,335.00 0.00 11% 10,815.00 86,520.00 108,150.00
848 Pasir Halus (untuk HRS) M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 229,345.00 0.00 11% 25,485.00 203,860.00 254,830.00
849 Pasir Tailing M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 305,945.00 0.00 11% 33,995.00 271,950.00 339,940.00
850 Pasir Urug (ada unsur lempung) M3 Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 208,495.00 0.00 11% 23,165.00 185,330.00 231,660.00
851 Strip Bearing Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 271,105.00 0.00 11% 30,125.00 240,980.00 301,230.00
852 Tiang Pancang Baja M' Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 44,730.00 0.00 11% 4,970.00 39,760.00 49,700.00
853 Matras Concrete Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 478,405.00 0.00 11% 53,155.00 425,250.00 531,560.00
854 Cat Marka (Non Thermoplas) Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 97,225.00 0.00 11% 10,805.00 86,420.00 108,030.00
855 Polytene 125 mikron Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 22,735.00 0.00 11% 2,525.00 20,210.00 25,260.00
856 Kayu Acuan M3 1,800,000.00 2 2 0.00 0.00 Tdk Ada Data 1,800,000.00 1,980,000.00 Penyesuaian 9% 180,000.00 1,980,000.00 1,800,000.00 1,800,000.00
857 Aditif anti pengelupasan Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 59,065.00 0.00 11% 6,565.00 52,500.00 65,630.00
858 Mata Kucing buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 88,595.00 0.00 11% 9,845.00 78,750.00 98,440.00
859 PCI Girder L=17m Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 148,995,000.00 Penyesuaian 9% 13,545,000.00 148,995,000.00 135,450,000.00 169,312,500.00
860 PCI Girder L=21m Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 168,052,500.00 Penyesuaian 9% 15,277,500.00 168,052,500.00 152,775,000.00 190,968,750.00
861 PCI Girder L=26m Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 214,830,000.00 Penyesuaian 9% 19,530,000.00 214,830,000.00 195,300,000.00 244,125,000.00
862 PCI Girder L=32m Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 272,002,500.00 Penyesuaian 9% 24,727,500.00 272,002,500.00 247,275,000.00 309,093,750.00
863 PCI Girder L=36m Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 291,060,000.00 Penyesuaian 9% 26,460,000.00 291,060,000.00 264,600,000.00 330,750,000.00
864 PCI Girder L=41m Buah Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 332,640,000.00 Penyesuaian 9% 30,240,000.00 332,640,000.00 302,400,000.00 378,000,000.00
865 Pelat Rambu (Eng. Grade) BH Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 186,875.00 0.00 11% 20,765.00 166,110.00 207,640.00
866 Pelat Rambu (High I. Grade) BH Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 238,850.00 0.00 11% 26,540.00 212,310.00 265,390.00
867 Pemantul Cahaya (Reflector) Bh. Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 14,885.00 0.00 11% 1,655.00 13,230.00 16,540.00
868 Pipa Baja Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 19,495.00 0.00 11% 2,165.00 17,330.00 21,660.00
869 Multipleks 12 mm Lbr Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 214,405.00 0.00 11% 23,825.00 190,580.00 238,230.00
870 Cansteen 15x28x40 Buah Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
871 Filler Kg Tidak Ada - 2 0.00 0.00 Tdk Ada Data Tdk Ada Data 1,700.00 Penyesuaian 26% 440.00 1,700.00 1,260.00 1,580.00
872 Cat Marka (Thermoplastic) Kg Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
873 Bahan Agr.Base Kelas A M³ Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data Cek_Item H-14 Tidak Ada Data #VALUE! Cek_Item Cek_Item Cek_Item
874 Bahan Agr.Base Kelas B M³ Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data Cek_Item H-14 Tidak Ada Data #VALUE! Cek_Item Cek_Item Cek_Item
875 Bahan Agr.Base Kelas C M³ Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data Cek_Item H-14 Tidak Ada Data #VALUE! Cek_Item Cek_Item Cek_Item
1 2 3 4 5 6 7 8 9 10 11 12 13 17 14 15 16 7 8 9 10 11 12
876 Baja Tulangan (Polos) U24 Kg Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 11,700.00 Penyesuaian Tidak Ada Data #VALUE! 11,700.00 Cek_Item Cek_Item
877 Baja Tulangan (Ulir) U32 Kg Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 12,815.00 Penyesuaian Tidak Ada Data #VALUE! 12,815.00 Cek_Item Cek_Item
878 Tiang Pancang Beton Pratekan M³ Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
879 Baja Tulangan (Polos) U32 Kg Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
880 Baja Tulangan (Ulir) U39 Kg Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
881 Baja Tulangan (Ulir) U48 Kg Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
882 Pipa Galvanis Dia 1,5" M¹ Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
883 Profil Alumunium Swing Door 6 M Tiang Polos Bh Tidak Ada - 1 230,000.00 230,000.00 230,000.00 230,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
884 Profil Alumunium Swing Door 4,4 M Tiang Polos Bh Tidak Ada - 1 170,000.00 170,000.00 170,000.00 170,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
885 Profil Alumunium Swing Door 6 M Tiang Moher Bh Tidak Ada - 1 240,000.00 240,000.00 240,000.00 240,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
886 Profil Alumunium Swing Door 4,4 M Tiang Moher Bh Tidak Ada - 1 180,000.00 180,000.00 180,000.00 180,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
887 Profil Alumunium Swing Door Ambang Atas Bh Tidak Ada - 1 210,000.00 210,000.00 210,000.00 210,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
888 Profil Alumunium Swing Door Ambang Bawah Bh Tidak Ada - 1 315,000.00 315,000.00 315,000.00 315,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
889 Profil Alumunium Swing Door Tutup Ambang Bh Tidak Ada - 1 50,000.00 50,000.00 50,000.00 50,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
890 Profil Alumunium Swing Door Skoneng (Besar) Bh Tidak Ada - 1 60,000.00 60,000.00 60,000.00 60,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
891 Profil Alumunium Swing Door 6 M Tiang Sliding Bh Tidak Ada - 1 120,000.00 120,000.00 120,000.00 120,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
892 Profil Alumunium Swing Door 4,4 M Tiang Sliding Bh Tidak Ada - 1 82,000.00 82,000.00 82,000.00 82,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
893 Profil Alumunium Swing Door 6 M Tiang Sliding Kait Bh Tidak Ada - 1 120,000.00 120,000.00 120,000.00 120,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
894 Profil Alumunium Swing Door 4,4 M Tiang Sliding Kait Bh Tidak Ada - 1 88,000.00 88,000.00 88,000.00 88,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
895 Profil Alumunium Shop Front 1½ X 3 " (M) Bh Tidak Ada - 2 130,000.00 150,000.00 140,000.00 140,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
896 Profil Alumunium Shop Front 1½ X 3 " (Open Back) Bh Tidak Ada - 2 130,000.00 138,000.00 134,000.00 134,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
897 Profil Alumunium Shop Front 1½ X 3 " (Jip/Tangga) Bh Tidak Ada - 1 140,000.00 140,000.00 140,000.00 140,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
898 Profil Alumunium Shop Front 1½ X 3 " (Tutup Jip/Tangga) Bh Tidak Ada - 1 55,000.00 55,000.00 55,000.00 55,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
899 Profil Alumunium Shop Front 1½ X 3 " (Tutup Kaca Mati) Bh Tidak Ada - 1 75,000.00 75,000.00 75,000.00 75,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
900 Profil Alumunium Shop Front 1½ X 3 " (Tutup Kaca Polos) Bh Tidak Ada - 1 50,000.00 50,000.00 50,000.00 50,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
901 Profil Alumunium Shop Front 1⅞ X 4 " (M) Bh Tidak Ada - 2 196,000.00 215,000.00 205,500.00 205,500.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
902 Profil Alumunium Shop Front 1⅞ X 4 " (Open Back) Bh Tidak Ada - 2 185,000.00 197,000.00 191,000.00 191,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
903 Profil Alumunium Shop Front 1⅞ X 4 " (Jip/Tangga) Bh Tidak Ada - 1 200,000.00 200,000.00 200,000.00 200,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
904 Profil Alumunium Shop Front 1⅞ X 4 " (Tutup Kaca Mati) Bh Tidak Ada - 1 105,000.00 105,000.00 105,000.00 105,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
905 Profil Alumunium Casement (Frame) Bh Tidak Ada - 1 195,000.00 195,000.00 195,000.00 195,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
906 Profil Alumunium Casement (Skoneng) Bh Tidak Ada - 1 195,000.00 195,000.00 195,000.00 195,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
907 A.A Sliding Bh Tidak Ada - 1 94,000.00 94,000.00 94,000.00 94,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
908 A.B Sliding Bh Tidak Ada - 1 148,000.00 148,000.00 148,000.00 148,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
909 R.A Sliding Bh Tidak Ada - 1 149,000.00 149,000.00 149,000.00 149,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
910 R.S Sliding 4,4 M Bh Tidak Ada - 1 71,000.00 71,000.00 71,000.00 71,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
911 R.S Sliding 6 M Bh Tidak Ada - 1 96,000.00 96,000.00 96,000.00 96,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
912 R.B Sliding Bh Tidak Ada - 1 120,000.00 120,000.00 120,000.00 120,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
913 Tiang Sliding Ekon Bh Tidak Ada - 1 73,000.00 73,000.00 73,000.00 73,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
914 Tiang Sliding Kait Ekon Bh Tidak Ada - 1 87,000.00 87,000.00 87,000.00 87,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
915 A.A Sliding Ekonomi Bh Tidak Ada - 1 70,000.00 70,000.00 70,000.00 70,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
916 A.B Sliding Ekonomi Bh Tidak Ada - 1 98,000.00 98,000.00 98,000.00 98,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
917 R.A Sliding Door Bh Tidak Ada - 1 120,000.00 120,000.00 120,000.00 120,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
918 R.S Slid Ekonomi Bh Tidak Ada - 1 66,000.00 66,000.00 66,000.00 66,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
919 R.B Sliding Door Bh Tidak Ada - 1 94,000.00 94,000.00 94,000.00 94,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
920 Troling Full Bh Tidak Ada - 1 127,000.00 127,000.00 127,000.00 127,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
921 U. Roling Bh Tidak Ada - 1 86,000.00 86,000.00 86,000.00 86,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
922 Center Post 10 Bh Tidak Ada - 1 200,000.00 200,000.00 200,000.00 200,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
923 Center Post 11,4 Bh Tidak Ada - 1 241,000.00 241,000.00 241,000.00 241,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
924 M Skrup 3 Bh Tidak Ada - 1 175,000.00 175,000.00 175,000.00 175,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
925 M Skrup 4 Bh Tidak Ada - 1 230,000.00 230,000.00 230,000.00 230,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
926 Hollow 1/2 X 3/4 Bh Tidak Ada - 1 32,000.00 32,000.00 32,000.00 32,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
927 Down Roling Full Bh Tidak Ada - 1 55,000.00 55,000.00 55,000.00 55,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
928 Down Roling Kunci Bh Tidak Ada - 1 47,000.00 47,000.00 47,000.00 47,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
929 Cuartain Wall (5303) Bh Tidak Ada - 1 174,000.00 174,000.00 174,000.00 174,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
930 Cuartain Wall (5304) Bh Tidak Ada - 1 77,000.00 77,000.00 77,000.00 77,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
931 Cuartain Wall (5305) Bh Tidak Ada - 1 159,000.00 159,000.00 159,000.00 159,000.00 #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Cek_Item Cek_Item
932 Baja Struktur Kg Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 20,000.00 Penyesuaian Tidak Ada Data #VALUE! 20,000.00 Cek_Item Cek_Item
933 Perlengkapan Ls Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 200.00 0.00 100% 200.00 0.00 - - - - - -
934 Semen tahan Asam Kg Tidak Ada - 0 0.00 0.00 Tdk Ada Data Tdk Ada Data 2,000.00 Penyesuaian 100% 2,000.00 2,000.00 0.00
TOKO PT. PPI WIJAYA
MANGUNI KARYA PELITA SUMBER MALALAYA BANGUNAN
KLABAT PINTU KOTA MURNI PAAL II BANGUN KALPATARE CABANG KOMBOS
JAYA SEMIGA JAYA AGUNG NG INDAH JAYA
UTAMA MANADO INDAH

13 14 15 16 17 18 19 20 21 22 23 24 25 26
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - 11,130.00 -
- - - - - - - - - - - - - -
900.00 800.00 1,000.00 800.00 - - 800.00 - - - - - - -
- 3,000.00 3,800.00 - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
137,500.00 500.00 137,500.00 - - - 143,750.00 - - - - - - -
- 240,000.00 - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - 8,500.00 - - - - - -
- - - - - - - 11,800.00 - - - - - -
- - - - - - - - - - - - - -
- - 37,500.00 - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 3,000.00 3,800.00 - - 2,400.00 2,600.00 - - - 3,500.00 - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 1,100,000.00 1,200,000.00 - 350,000.00 1,300,000.00 1,175,000.00 - - - - - - -
- 1,100,000.00 1,200,000.00 - 350,000.00 - - - - - - - - -
- - 1,200,000.00 - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - 35,000.00 - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
550,000.00 425,000.00 500,000.00 500,000.00 - 400,000.00 475,000.00 - - - - - - -
550,000.00 - 500,000.00 - - 475,000.00 475,000.00 - - - - - - -
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- 18,000.00 2,100.00 - - - 1,800.00 - - - - - - -
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- - - - - - 7,500.00 - - - - - -
- - - - - - - 11,450.00 - - - - - -
1,700.00 1,700.00 1,500.00 2,100.00 1,180.00 1,500.00 1,600.00 - 1,700.00 1,900.00 3,000.00 1,700.00 - -
1,700.00 2,500.00 2,400.00 2,300.00 1,900.00 5,000.00 1,800.00 - 5,000.00 2,400.00 5,000.00 5,000.00 - -
12,500.00 - 45,000.00 13,000.00 13,000.00 15,000.00 12,000.00 - - 11,000.00 12,000.00 10,000.00 - -
- 450,000.00 - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 150,000.00 200,000.00 - - 200,000.00 - - - - - - - -
- 150,000.00 200,000.00 - - - - - - - - - - -
- 150,000.00 200,000.00 - - - - - - - - - - -
- - - - - - - - - - - - - -
20,000.00 65,000.00 - 18,000.00 - 30,000.00 90,000.00 - 70,000.00 20,000.00 19,000.00 22,500.00 - 82,500.00
45,000.00 85,000.00 - 25,000.00 - 37,500.00 150,000.00 - 95,000.00 27,500.00 24,000.00 30,000.00 - 120,000.00
- - - - - - - - - - - - - 12,000.00
- - - 40,000.00 - - - - 60,000.00 - - - - 30,500.00
- - - 70,000.00 - 70,000.00 - - 60,000.00 65,000.00 - - - 47,000.00
- - - 75,000.00 - - 75,000.00 - 110,000.00 55,000.00 - - - 50,500.00
- - - 110,000.00 - - - - 110,000.00 120,000.00 - - - 87,000.00
- - - 195,000.00 - - - - 190,000.00 160,000.00 - - - 168,500.00
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - 9,750.00
- - - - - - - - - - - - - 995,000.00
- - - 350,000.00 - - - - - - - 385,000.00 - 330,000.00
- - - 650,000.00 - - - - - - - 650,000.00 - 590,000.00
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
13 14 15 16 17 18 19 20 21 22 23 24 25 26
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - 20,000.00 - -
- - - - - - - - - - - 20,000.00 - 12,000.00
- - - 320,000.00 - - - - - - - 20,000.00 - 220,000.00
- - - - - - - - - - - 20,000.00 - 310,000.00
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
20,000.00 - - 170,000.00 - - 20,000.00 - 18,000.00 18,500.00 20,000.00 20,000.00 - 120,000.00
60,000.00 - - 65,000.00 - - - - - 67,500.00 70,000.00 - - 52,500.00
- - - - - - - - 25,000.00 - - - - -
30,000.00 - - 37,000.00 - - 35,000.00 - - 35,000.00 35,000.00 - - 26,500.00
- - - 300,000.00 - - - - - - - - - 257,000.00
- - - 500,000.00 - - - - - - - - - 414,500.00
- - - 250,000.00 - - - - - - - - - -
- 25,000.00 - - - - 12,000.00 - - - - - - -
15,000.00 20,000.00 25,000.00 15,000.00 13,000.00 20,000.00 - - 13,000.00 25,000.00 40,000.00 25,000.00 - 10,000.00
30,000.00 35,000.00 25,000.00 37,000.00 - - 15,000.00 - - - 30,000.00 25,000.00 - 20,000.00
15,000.00 15,000.00 15,000.00 15,000.00 14,000.00 16,000.00 - - 17,500.00 14,000.00 16,000.00 - - -
- - - - - - - - - - - - - -
- 15,000.00 - - - - 10,000.00 - - - - - - -
10,000.00 8,000.00 6,600.00 - - - 20,000.00 - - - - - - -
20,000.00 25,000.00 20,000.00 25,000.00 22,000.00 25,000.00 20,000.00 - 22,000.00 20,000.00 21,000.00 20,000.00 - 20,000.00
20,000.00 20,000.00 16,000.00 20,000.00 20,000.00 25,000.00 - - 19,000.00 20,000.00 21,000.00 20,000.00 - 310,000.00
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - 2,800,000.00 - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - 10,000.00 - 9,000.00 500.00 - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
30,000.00 22,000.00 26,000.00 25,000.00 23,000.00 - 30,000.00 - 26,000.00 25,000.00 31,000.00 - - 24,500.00
32,000.00 50,000.00 64,000.00 50,000.00 70,000.00 58,000.00 65,000.00 - 73,000.00 70,000.00 67,000.00 67,500.00 - 61,500.00
92,000.00 75,000.00 96,000.00 70,000.00 102,000.00 78,000.00 100,000.00 - 105,000.00 105,000.00 95,000.00 92,500.00 - 89,500.00
135,000.00 - 147,000.00 135,000.00 - - 135,000.00 - 130,000.00 140,000.00 - 175,000.00 - 131,500.00
- 165,000.00 174,000.00 175,000.00 - - 155,000.00 - 175,000.00 180,000.00 - 27,500.00 - 161,000.00
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- - - 135,000.00 - - - - - - - 135,000.00 - 105,000.00
- 165,000.00 174,000.00 175,000.00 - - - - 175,000.00 - - 176,000.00 - 161,000.00
- - - - - - - - - - - - - 234,000.00
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- - - - - - - - - - - - - 307,500.00
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- 40,000.00 - - 45,000.00 16,000.00 - - - - - - - -
- 75,000.00 - - 58,000.00 - - - - - - - - -
- 10,000.00 - - - - - - - - - - - -
- - - - - - - - - - - - - -
20,000.00 - 22,000.00 - - 35,000.00 - - - - 21,000.00 - - -
35,000.00 22,500.00 50,000.00 - - 45,000.00 - - - 37,500.00 37,000.00 - - -
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- 10,000.00 8,000.00 - - - - - - - - - - -
4,000.00 15,000.00 12,000.00 3,500.00 10,000.00 3,000.00 3,000.00 - - 3,500.00 5,000.00 - - -
- - 115,000.00 150,000.00 - 50,000.00 110,000.00 - 105,000.00 130,000.00 115,000.00 129,000.00 - -
45,000.00 55,000.00 55,000.00 55,000.00 55,000.00 68,000.00 45,000.00 - 57,500.00 55,000.00 60,000.00 57,500.00 - -
- - - - - - - - - - - - - -
35,000.00 40,000.00 - 30,000.00 28,000.00 - 35,000.00 - 33,000.00 32,500.00 30,000.00 32,500.00 - -
- - - - - - - - 50,000.00 - - 50,000.00 - -
- - 210,000.00 - 108,000.00 50,000.00 110,000.00 - 105,000.00 250,000.00 - 240,000.00 - -
95,000.00 90,000.00 110,000.00 90,000.00 108,000.00 - 95,000.00 - - 110,000.00 95,000.00 110,000.00 - -
45,000.00 50,000.00 50,000.00 45,000.00 40,000.00 - 45,000.00 - - 40,000.00 40,000.00 - - -
50,000.00 55,000.00 850,000.00 50,000.00 20,000.00 68,000.00 50,000.00 - 176,000.00 180,000.00 180,000.00 176,000.00 - -
- - - - - - - - - - - - - -
45,000.00 85,000.00 90,000.00 85,000.00 80,000.00 75,000.00 70,000.00 - - 75,000.00 70,000.00 - - 66,000.00
35,000.00 60,000.00 110,000.00 - - - 35,000.00 - - 32,500.00 - 32,500.00 - -
35,000.00 57,500.00 36,000.00 40,000.00 - 30,000.00 30,000.00 - - 32,500.00 33,000.00 35,000.00 - -
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
37,500.00 - 35,000.00 40,000.00 8,000.00 15,000.00 60,000.00 - 35,000.00 35,000.00 35,000.00 35,000.00 - 5,000.00
25,000.00 22,500.00 80,000.00 25,000.00 23,000.00 20,000.00 20,000.00 - 20,000.00 22,500.00 21,000.00 20,000.00 - 75,000.00
- 10,000.00 - - - - - - - 7,500.00 10,000.00 - - -
- 45,000.00 58,000.00 - 40,000.00 55,000.00 45,000.00 - - - - - - -
20,000.00 45,000.00 58,000.00 60,000.00 40,000.00 - - - - 42,500.00 45,000.00 - - -
50,000.00 70,000.00 45,000.00 - 65,000.00 - - - 60,000.00 50,000.00 - 60,000.00 - -
- - - - - - - - - - - - - -
30,000.00 25,000.00 45,000.00 - - - 25,000.00 - - 47,500.00 45,000.00 - - -
10,000.00 10,000.00 10,000.00 8,000.00 - - 10,000.00 - - - 17,500.00 10,000.00 - -
- - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 8,000,000.00 - - - - - - - - - 9,500,000.00 - -
- 8,000,000.00 - - - - - - - - - 9,500,000.00 - -
5,750,000.00 5,500,000.00 - - - 3,000,000.00 - - - - - 5,000,000.00 - -
4,100,000.00 4,500,000.00 - 1,900,000.00 - - - - 2,300,000.00 - - 2,500,000.00 - -
- - 1,900,000.00 - 1,800,000.00 - 1,500,000.00 - - - - 1,550,000.00 - -
- - - - - - - - - - - - - -
- 40,000.00 - 35,000.00 - - - - - - - - - -
- - - - - - - - 35,000.00 - - 35,000.00 - -
- 55,000.00 - - - - - - - - - - - -
- 90,000.00 46,000.00 80,000.00 - - - - 90,000.00 - - 90,000.00 - 79,500.00
- 35,000.00 46,000.00 31,000.00 - - 30,000.00 - 30,000.00 - - 31,000.00 - 30,000.00
150,000.00 150,000.00 - - 42,000.00 - - - - - - - - -
13 14 15 16 17 18 19 20 21 22 23 24 25 26
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- 27,500.00 30,000.00 - - - - - - - - - - 31,500.00
- 27,500.00 30,000.00 - - - 30,000.00 - - - - - - 28,000.00
- - - - - - - - - - - - - 33,000.00
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 10,000.00 - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 1,850,000.00 - - - - - - - - - - - -
- 25,000.00 - - - 15,000.00 - - - - - - - -
- - - - - - - - 55,000.00 - - - - -
- 65,000.00 - - - - - - - - - 40,000.00 - -
- 45,000.00 - - - - 30,000.00 - - - - 32,500.00 - -
- 1,650,000.00 - - - 50,000.00 - - - - - 1,600,000.00 - -
- - 90,000.00 - 70,000.00 - 75,000.00 - - - - 75,000.00 - -
53,000.00 55,000.00 55,000.00 52,500.00 53,000.00 - 50,000.00 - 47,000.00 52,500.00 53,000.00 55,000.00 - -
- - - - - - - - 75,000.00 - - 67,500.00 - -
- 55,000.00 - 50,000.00 - - - - 25,000.00 55,000.00 53,000.00 57,500.00 - -
- 55,000.00 - 60,000.00 - - - - - - - - - 70,000.00
85,000.00 85,000.00 65,000.00 - 70,000.00 - - - - - - 75,000.00 - -
43,000.00 42,500.00 43,000.00 41,000.00 40,000.00 - 45,000.00 - - 42,500.00 - 42,000.00 - 40,750.00
- 55,000.00 - - - - - - - - - - - -
- 55,000.00 - - - - - - - - - - - 49,000.00
- 85,000.00 - - - 49,000.00 - - - - - - - 59,000.00
- 45,000.00 45,000.00 45,000.00 45,000.00 - - - 15,000.00 45,000.00 - 45,000.00 - -
- 55,000.00 - - - - - - 20,000.00 - - - - -
- 75,000.00 - - - - - - 25,000.00 - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 65,000.00 - - - 50,000.00 - - - - - - - -
60,000.00 65,000.00 - - 60,000.00 68,000.00 65,000.00 - - - - - - -
65,000.00 65,000.00 - - - 68,000.00 70,000.00 - - - - - - -
55,000.00 75,000.00 - - 62,000.00 70,000.00 70,000.00 - - - - - - -
- 65,000.00 65,000.00 65,000.00 60,000.00 - 65,000.00 - - 57,500.00 - - - -
- 65,000.00 75,000.00 65,000.00 - - 70,000.00 - - - - - - -
- 75,000.00 85,000.00 70,000.00 62,000.00 - 70,000.00 - - 60,000.00 - - - -
- 125,000.00 - - - - - - - - - - - -
- - - - - - - - - - - 68,000.00 - -
- - - - - - - - - - - 78,000.00 - -
- - - - - - - - - - - 95,000.00 - -
- - - - - - - - - - - 72,500.00 - -
- - - - - - - - - - - 165,000.00 - -
- - - - - - - - - - - 68,000.00 - -
- - - - - - - - - - - 72,500.00 - -
- - - - - - - - - - - 75,000.00 - -
- - - - - - - - - - - 95,000.00 - -
- - - 175,000.00 - - - - - - - 185,000.00 - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - 65,000.00 - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 65,000.00 65,000.00 - 60,000.00 - - - - - - - - -
- 65,000.00 65,000.00 - - - - - - - - 65,000.00 - -
- 65,000.00 65,000.00 - - - - - - - - 75,000.00 - -
- 65,000.00 70,000.00 - - - - - - - - 77,000.00 - -
- 75,000.00 - 65,000.00 - - - - 65,000.00 - - 77,000.00 - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 75,000.00 - 85,000.00 - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 65,000.00 - - - - - - - - - - - -
13 14 15 16 17 18 19 20 21 22 23 24 25 26
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
200,000.00 275,000.00 250,000.00 230,000.00 185,000.00 200,000.00 190,000.00 - - - - 500,000.00 - -
200,000.00 475,000.00 350,000.00 390,000.00 400,000.00 400,000.00 325,000.00 - - - - 800,000.00 - -
350,000.00 250,000.00 300,000.00 325,000.00 - - - - - - - - - -
- 2,800,000.00 - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 45,000.00 50,000.00 35,000.00 - - 17,500.00 - - 17,500.00 - - - -
- 2,800,000.00 2,000,000.00 - - - - - - - - - - -
- 2,300,000.00 1,500,000.00 - - - - - - - - - - -
- - - - - - - - - - - - - -
95,000.00 1,650,000.00 575,000.00 1,800,000.00 650,000.00 200,000.00 390,000.00 - 270,000.00 400,000.00 - 265,000.00 - -
- 135,000.00 450,000.00 135,000.00 130,000.00 130,000.00 100,000.00 - 2,500,000.00 130,000.00 - 2,400,000.00 - -
- - - 1,100,000.00 - 800,000.00 - - - - - - - -
15,000.00 20,000.00 20,000.00 20,000.00 15,000.00 15,000.00 175,000.00 - - 15,000.00 15,000.00 - - -
- 25,000.00 25,000.00 25,000.00 25,000.00 17,000.00 20,000.00 - - 22,500.00 32,000.00 - - -
- 135,000.00 190,000.00 200,000.00 - - - - - 135,000.00 - 185,000.00 - 183,500.00
- 65,000.00 98,000.00 125,000.00 - - - - - 80,000.00 - 115,000.00 - 99,000.00
- 250,000.00 350,000.00 345,000.00 - - - - - - - 350,000.00 - 328,000.00
- 545,000.00 140,000.00 1,025,000.00 - - - - - - - 600,000.00 - 553,500.00
- 125,000.00 120,000.00 140,000.00 - - - - - 100,000.00
- 155,000.00 - 137,500.00
- - 42,000.00 100,000.00 - - - - - 95,000.00
- - - 89,000.00
- - 170,000.00 55,000.00 - - - - - 55,000.00
- - - 54,500.00
- - - 175,000.00 - - - - - 170,000.00
- - - 171,500.00
- - 58,000.00 400,000.00 - - - - - - - - - 375,000.00
- - - 80,000.00 - - - - - 75,000.00 - - - 68,500.00
- - - - - - - - - - - - - 53,500.00
- - - - - - - - - - - 47,500.00 - 32,500.00
- - - - - - - - - - - 135,000.00 - 113,000.00
- - - - - - - - - - - - - 256,500.00
- - - - - - - - - - - 75,000.00 - 42,000.00
- 12,500.00 - 12,000.00 - - - - - - - - - -
- 9,000.00 - 8,000.00 - - - - - - - - - -
- - - 7,000.00 - - - - - - - - - -
- - - - - - - - - - - - - -
40,000.00 35,000.00 36,000.00 35,000.00 35,000.00 30,000.00 35,000.00 - 37,500.00 35,000.00 - 37,000.00 - 25,000.00
65,000.00 115,000.00 20,000.00 60,000.00 60,000.00 50,000.00 65,000.00 - 64,500.00 50,000.00 - 65,000.00 - 42,500.00
80,000.00 151,000.00 79,000.00 75,000.00 72,000.00 60,000.00 75,000.00 - 82,500.00 65,000.00 - 75,000.00 - 53,500.00
- 19,000.00 20,000.00 - - - 20,000.00 - - - - 27,500.00 - -
- 26,000.00 27,000.00 - - - 25,000.00 - - - - - - -
- 54,000.00 53,000.00 - 50,000.00 - - - - - - 52,500.00 - 37,500.00
- 19,000.00 20,000.00 - 18,000.00 - - - 20,000.00 20,000.00 - 65,000.00 - 13,000.00
- 155,000.00 158,000.00 - 140,000.00 130,000.00 150,000.00 - 162,000.00 150,000.00 - 155,000.00 - 108,000.00
- 26,000.00 27,000.00 - 25,000.00 25,000.00 - - 27,000.00 27,500.00 - 27,500.00 - 18,000.00
- 265,000.00 247,000.00 - 220,000.00 130,000.00 230,000.00 - 268,000.00 240,000.00 - 255,000.00 - 178,000.00
13 14 15 16 17 18 19 20 21 22 23 24 25 26
13 14 15 16 17 18 19 20 21 22 23 24 25 26
13 14 15 16 17 18 19 20 21 22 23 24 25 26

- 550,000.00 450,000.00 575,000.00 140,000.00 250,000.00 - - - - - - - -


- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
1,200,000.00 1,250,000.00 1,400,000.00 1,100,000.00 - - 1,250,000.00 - 1,600,000.00 - - - - -
850,000.00 850,000.00 1,050,000.00 850,000.00 830,000.00 - 850,000.00 - 1,100,000.00 - - - - -
- - 158,000.00 - 50,000.00 - - - - - - - - -
- - - - - - - - - - - - - -
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 1,350,000.00 - - - - - - - - - - - -
- 650,000.00 - - - - - - - - - - - -
- 5,000.00 5,000.00 - 4,000.00 10,000.00 5,000.00 - - - - - - -
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- - - - - - - - - - - - - -
- 15,000.00 - - 12,000.00 - 15,000.00 - - - - - - -
- 1,350,000.00 15,000.00 - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - 7,000.00 - 7,300.00 - 8,000.00 - - 295,000.00 - - - -
- - 9,000.00 - 9,300.00 - 10,000.00 - - 405,000.00 - - - -
13 14 15 16 17 18 19 20 21 22 23 24 25 26
- - - - 43,000.00 - - - - - - - - -
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item
- - - - - - 17,500.00 - - - - - - -
- 25,000.00 18,000.00 21,000.00 14,000.00 15,500.00 17,500.00 - - 17,500.00 - - - -
- 25,000.00 20,000.00 - 14,000.00 12,500.00 17,500.00 - - 20,000.00 - - - -
- 25,000.00 13,000.00 17,000.00 8,000.00 12,500.00 - - - 15,000.00 - - - -
- - - - - - - - - - - - - -
- 25,000.00 15,000.00 21,000.00 14,000.00 - - - - 15,000.00 - - - -
- - - - - 28,000.00 - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 135,000.00 - - - - - - - - - - - -
- 150,000.00 - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 150,000.00 - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 110,000.00 - 20,000.00 - - 22,500.00 - - - - - - -
- 450,000.00 - - - - 25,000.00 - - - - - - -
- 25,000.00 25,000.00 20,000.00 - - 22,500.00 - - - - - - -
- 15,000.00 25,000.00 25,000.00 - 25,000.00 22,500.00 - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - 27,500.00 - - - - - - - -
- 150,000.00 15,000.00 5,000.00 - 32,000.00 - - - 15,000.00 25,000.00 - - -
- 30,000.00 22,000.00 7,000.00 - - - - - 20,000.00 30,000.00 - - -
- 15,000.00 8,000.00 - - 22,500.00 - - - 6,500.00 - - - -
- 10,000.00 10,000.00 - 10,000.00 - - - - 7,500.00 6,000.00 - - -
- - 36,000.00 - 20,000.00 - - - - - - - - -
- - 8,000.00 - - - - - - - - - - -
- - - 125,000.00 - - - - - 25,000.00 - - - -
- - - - - - - - - - - - - -
- 5,000.00 10,000.00 5,000.00 - 10,000.00 - - - 6,000.00 - - - -
- 10,000.00 36,000.00 3,000.00 15,000.00 - - - - - - - - -
10,000.00 5,000.00 5,000.00 2,000.00 8,000.00 - - - - 3,500.00 6,000.00 - - -
- 3,000.00 3,000.00 - 8,000.00 15,000.00 - - - 6,000.00 - - - -
235,000.00 260,000.00 250,000.00 225,000.00 - - - - - - 225,000.00 - - -
- 12,500.00 15,000.00 5,000.00 15,000.00 15,000.00 12,000.00 - - 12,500.00 12,000.00 - - -
- - 100,000.00 - 30,000.00 - - - - - 135,000.00 - - -
- 5,000.00 15,000.00 - 6,000.00 27,500.00 8,000.00 - - - 35,000.00 - - -
- 45,000.00 65,000.00 - 22,000.00 30,000.00 - - - - - - - -
- 185,000.00 150,000.00 50,000.00 - 30,000.00 - - - - - - - -
- - - - - - - - - - - - - -
- 50,000.00 45,000.00 - - 15,000.00 - - - - - - - -
- 160,000.00 25,000.00 - 70,000.00 - - - - 60,000.00 - - - -
- 325,000.00 - - 300,000.00 - 350,000.00 - - - 350,000.00 - - -
- - - - - - - - - - - - - -
- 30,000.00 - - - - - - - 27,500.00 - - - -
- 165,000.00 60,000.00 75,000.00 - 130,000.00 - - - - - - - -
- - 75,000.00 - - 135,000.00 - - - - - - - -
- - 100,000.00 - - 145,000.00 - - - - - - - -
- - - - - - - - - - - - - -
- 17,500.00 - - - - - - - - - - - -
- - - - - - - - - - - - - -
65,000.00 77,500.00 70,000.00 70,000.00 - 82,000.00 70,000.00 - 85,000.00 75,000.00 - - - 66,000.00
11,000.00 15,000.00 - - 12,000.00 - 10,000.00 - - - - - - -
- - - - 14,000.00 - 12,500.00 - - - - - - -
- 12,500.00 - - - 15,000.00 12,500.00 - - - - - - -
- 27,500.00 - - - - - - - - - - - -
130,000.00 17,500.00 - - 15,000.00 - 15,000.00 - - 15,000.00 - - - -
- - - - - - - - - - - - - -
69,000.00 72,500.00 73,000.00 65,000.00 - - 70,000.00 - 70,000.00 70,000.00 68,000.00 68,000.00 - -
82,000.00 85,000.00 89,000.00 78,000.00 - - 90,000.00 - 83,000.00 85,000.00 85,000.00 82,500.00 - -
128,000.00 135,000.00 142,000.00 110,000.00 120,000.00 - 140,000.00 - 135,000.00 135,000.00 135,000.00 13,500.00 - 126,000.00
80,000.00 95,000.00 88,000.00 70,000.00 - - - - - - 95,000.00 80,000.00 - 95,000.00
- - - - - - - - - - - - - -
13 14 15 16 17 18 19 20 21 22 23 24 25 26
- - - - - - - - - - - - - -
222,000.00 - 247,000.00 - - - - - - - - - - -
66,000.00 85,000.00 75,000.00 - - - - - - - - - - 61,000.00
80,000.00 95,000.00 90,000.00 - - 55,000.00 - - - - - - - 72,000.00
52,000.00 53,000.00 56,000.00 53,000.00 52,000.00 - 54,000.00 - 55,000.00 54,000.00 53,000.00 52,000.00 - 50,000.00
69,000.00 72,500.00 73,000.00 65,000.00 - - 74,000.00 - 70,000.00 70,000.00 - 68,000.00 - 65,000.00
82,000.00 85,000.00 89,000.00 78,000.00 - - - - 85,000.00 - - 80,000.00 - 77,500.00
- 15,000.00 13,000.00 - 10,000.00 20,000.00 14,000.00 - 15,000.00 - 15,000.00 15,000.00 - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - -
13 14 15 16 17 18 19 20 21 22 23 24 25 26

- - - - - - - - - - - - - -
DAFTAR HARGA SATUAN UPAH

HARGA per JAM HARGA per HARI


NO. JENIS UPAH KET.
Satuan (Rp.) Satuan (Rp.)

1 Pekerja Jam / Org 12,500.00 Hari / Org 100,000.00

2 Mandor Jam / Org 15,000.00 Hari / Org 120,000.00

3 Tukang Batu Jam / Org 15,625.00 Hari / Org 125,000.00

4 Tukang Besi Jam / Org 15,625.00 Hari / Org 125,000.00

5 Tukang Cat Jam / Org 15,625.00 Hari / Org 125,000.00

6 Tukang Las Jam / Org 15,625.00 Hari / Org 125,000.00

7 Tukang Jam / Org 15,625.00 Hari / Org 125,000.00

8 Tukang Kayu Jam / Org 15,625.00 Hari / Org 125,000.00

9 Kepala Tukang Jam / Org 18,750.00 Hari / Org 150,000.00

10 Instalatur Jam / Org 18,750.00 Hari / Org 150,000.00

11 Mekanik/ Sopir Jam / Org 18,750.00 Hari / Org 150,000.00

12 Operator/Masinis Jam / Org 18,750.00 Hari / Org 150,000.00

13 Pembantu Operator / Mekanik Jam / Org 15,625.00 Hari / Org 125,000.00

14 Pembantu Tukang / Penjaga Jam / Org 15,625.00 Hari / Org 125,000.00

Catatan :
- Sesuai harga yang berlaku dipasaran.
- Harga satuan belum termasuk pajak yang berlaku.
- Harga sewaktu-waktu bisa berubah

Satuan Jadi 2016 34 dari 127


DAFTAR HARGA SATUAN UPAH (SWAKELOLA)

HARGA per JAM HARGA per HARI


NO. JENIS UPAH KET.
Satuan (Rp.) Satuan (Rp.)

1 Pekerja Jam / Org 12,500.00 Hari / Org 100,000.00

2 Mandor Jam / Org 15,000.00 Hari / Org 120,000.00

3 Tukang Batu Jam / Org 15,625.00 Hari / Org 125,000.00

4 Tukang Besi Jam / Org 15,625.00 Hari / Org 125,000.00

5 Tukang Cat Jam / Org 15,625.00 Hari / Org 125,000.00

6 Tukang Las Jam / Org 15,625.00 Hari / Org 125,000.00

7 Tukang Jam / Org 15,625.00 Hari / Org 125,000.00

8 Tukang Kayu Jam / Org 15,625.00 Hari / Org 125,000.00

9 Kepala Tukang Jam / Org 18,750.00 Hari / Org 150,000.00

10 Instalatur Jam / Org 18,750.00 Hari / Org 150,000.00

11 Mekanik/ Sopir Jam / Org 18,750.00 Hari / Org 150,000.00

12 Operator/Masinis Jam / Org 18,750.00 Hari / Org 150,000.00

13 Pembantu Operator / Mekanik Jam / Org 15,625.00 Hari / Org 125,000.00

14 Pembantu Tukang / Penjaga Jam / Org 15,625.00 Hari / Org 125,000.00

Catatan :
- Sesuai harga yang berlaku dipasaran.
- Harga satuan belum termasuk pajak yang berlaku.
- Harga sewaktu-waktu bisa berubah

543989834.xls
35 dari 127
UPAH swakel
DAFTAR HARGA SATUAN BAHAN

HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)

1 Agregat Base Kelas A M³ 496,489.53


2 Agregat Base Kelas B M³ 426,631.31
3 Agregat Base Kelas C M³ 360,417.17
4 Agregat Halus M³ 337,983.91
5 Agregat Kasar M³ 337,983.91
6 Air Ltr 150.00
7 Alang-alang Ikat 30,000.00
8 Aspal Kg 11,857.20
9 Aspal Hotmix (Ready Mix) Ton 1,600,000.00
10 Bata merah Bh 850.00
11 Batako Uk. 20 x 40 x 10 Bh 2,000.00
12 Batu Alam 10 x 20 M² 135,000.00
13 Batu apung Kg 7,090.00
14 Batu Bata Klinker Uk. 5 x 5 x 25 Bh 1,780.00
15 Batu Belah / Batu Kali / Batu Gunung M³ 294,800.00
16 Batu Belah Uk. 15 - 20 M³ 296,200.00
17 Batu Boulder M³ 200,000.00
18 Batu Bunga (Alam) M² 147,655.00
19 Batu Candi 10 x 20 M² 147,500.00
20 Batu Candi 30 x 30 M² 210,000.00
21 Batu Green Bally 15 x 30 M² 185,000.00
22 Batu Green Bally 20 x 40 M² 185,000.00
23 Batu Palimanan 10 x 20 M² 145,000.00
24 Batu Palimanan 15 x 30 M² 165,000.00
25 Batu Palimanan 20 x 40 M² 170,000.00
26 Batu Palimanan 30 x 30 M² 170,000.00
27 Batu Pecah Uk. 0,5 - 1 M³ 375,000.00
28 Batu Pecah Uk. 1 - 3 M³ 337,500.00
29 Batu Pecah Uk. 3 - 5 M³ 312,500.00
30 Batu Pecah Uk. 5 - 7 M³ 287,500.00
31 Batu Sukabumi 10 x 20 M² 130,000.00
32 Batu Sukabumi 15 x 15 M² 115,000.00
33 Bensin / Premium (HET) Ltr 7,600.00
34 Bensin / Premium (Industri) Ltr 9,424.00
35 Butonite Patch Kg 24,250.00
36 Cansteen Bh 45,000.00
37 Gebalan Rumput M² 30,000.00
38 Geotextile M¹ 7,685.00
39 Hollow Brick Bh 3,600.00
40 Ijuk Kg 40,000.00
41 Kapur Padam M³ 245,460.00
42 Kapur sirih Kg 1,070.00
43 Karet Elastomer Bh 825,830.00
44 Kerikil Beton M³ 333,100.00
45 Kerikil Koral Uk. 1 - 3 cm M³ 326,015.00
46 Koral Sikat 2 - 3 cm Kg 10,000.00
47 Koral Sikat Panca Warna Kg 7,500.00
48 Minyak Bekisting Ltr 10,500.00

Satuan Jadi 2016 Halaman 36 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
49 Minyak Pelumas / Oli (Pertamina) Ltr 34,080.00
50 Minyak Pelumas / Oli (Shell) Ltr
51 Minyak Tanah / Kerosine (Industri) Ltr 12,724.62
52 Pasir Kasar/ Urug M³ 52,000.00
53 Pasir Pasang / Beton M³ 240,600.00
54 Pasir Pasang (Sedang) M³ 296,400.00
55 Paving Stone t=6 cm Bh 3,500.00
56 Paving Stone t=8 cm Bh 4,000.00
57 S o l a r (HET) Ltr 12,376.48
58 S o l a r (Industri) Ltr
59 Semen PC Kg 1,333.47
60 Semen Putih Kg 72,000.00
61 Semen Warna Kg 12,000.00
62 Sirtu Alam M³ 225,000.00
63 Storox-100 Kg 50,000.00
64 Tanah Biasa M³ 60,000.00
65 Tanah Liat M³ 60,000.00
66 Tanah Pilihan M³ 75,000.00
67 Trihex Paving Bh 3,500.00
68 Besi Hollow 2 x 4 cm M¹ 48,500.00
69 Besi Hollow 4 x 4 cm M¹ 64,250.00
70 Besi Profil Kg 17,500.00
71 Besi Siku 3 x 3 x 2 M¹ 75,000.00
72 Besi Siku 3 x 3 x 3 M¹ 95,000.00
73 Besi Siku 4 x 4 x 3 M¹ 85,000.00
74 Besi Siku 4 x 4 x 4 M¹ 135,000.00
75 Besi Siku 5 x 5 x 5 M¹ 200,000.00
76 Besi Stainlessteel 1/2" M¹ 77,500.00
77 Besi Stainlessteel 3/4" M¹ 95,000.00
78 Besi Stainlessteel 1" M¹ 110,000.00
79 Besi Stainlessteel 1 1/4" M¹ 115,000.00
80 Besi Stainlessteel 1 1/2" M¹ 120,000.00
81 Besi Stainlessteel 2" M¹ 139,925.00
82 Besi Stainlessteel 3" M¹ 150,000.00
83 Besi Stainlessteel 4" M¹ 240,000.00
84 Besi strip Kg 88,000.00
85 Besi Warmesh θ 10 Unit 1,000,000.00
86 Besi Warmesh θ 6 Unit 375,000.00
87 Besi Warmesh θ 8 Unit 650,000.00
88 Bois Beton dia. 100 cm (pakai tulangan) Bh 150,000.00
89 Bois Beton dia. 100 cm (tanpa tulangan) Bh 160,000.00
90 Bois Beton dia. 150 cm (pakai tulangan) Bh 200,000.00
91 Bois Beton dia. 150 cm (tanpa tulangan) Bh 230,000.00
92 Bois Beton dia. 60 cm (pakai tulangan) Bh 200,000.00
93 Bois Beton dia. 60 cm (tanpa tulangan) Bh 250,000.00
94 Bois Beton dia. 80 cm (pakai tulangan) Bh 280,000.00
95 Bois Beton dia. 80 cm (tanpa tulangan) Bh 350,000.00
96 Kawat baja Kg 30,000.00
97 Kawat Beronjong Kg 20,790.00
98 Kawat Beronjong (Jadi) dia. 2,7 mm ( 2 x 1 x 0,5 ) M³ 420,000.00
99 Kawat Beronjong (Jadi) dia. 2,7 mm ( 3 x 1 x 0,5 ) M³ 520,000.00
100 Kawat Beronjong (Jadi) dia. 3,0 mm ( 2 x 1 x 0,5 ) M³ 420,000.00
101 Kawat Beronjong (Jadi) dia. 3,0 mm ( 3 x 1 x 0,5 ) M³ 630,000.00

Satuan Jadi 2016 Halaman 37 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
102 Kawat Beton / Bendrat Kg 23,100.00
103 Kawat Duri Kg 60,000.00
104 Kawat jaring galvanis M¹ 40,000.00
105 Kawat Las Kg 30,000.00
106 Pagar BRC (BRC Fence) ; tinggi = 120 cm M¹ 600,000.00
107 Pagar BRC (BRC Fence) ; tinggi = 175 cm M¹ 650,000.00
108 Pagar BRC (BRC Fence) ; tinggi = 90 cm M¹ 500,000.00
109 Paku Asbes Bh Bh 1,000.00
110 Paku Beton Kg 25,000.00
111 Paku Genteng Metal Kg 30,000.00
112 Paku Kayu 2" s/d 6" Kg 18,000.00
113 Paku pancing Kg 20,000.00
114 Paku Reng Kg 17,500.00
115 Paku Sekrup Kg 55,000.00
116 Paku Seng Kg 22,000.00
117 Paku Tripleks Kg 22,500.00
118 Pintu gulung besi M² 750,000.00
119 Plat Rambu Bh 238,735.00
120 Profil alumunium "T" M¹ 27,000.00
121 Rel Pengaman (Guard Rail) M¹ 412,500.00
122 Rolling Door M² 450,000.00
123 Sekrup fixer Bh 200.00
124 Sekrup Galbani Bh 600.00
125 Besi Beton Polos Kg 11,700.00
126 Besi Beton Polos dia. 6 mm Ujung 30,000.00
127 Besi Beton Polos dia. 10 mm Ujung 64,500.00
128 Besi Beton Polos dia. 12 mm Ujung 96,000.00
129 Besi Beton Polos dia. 14 mm Ujung 142,000.00
130 Besi Beton Polos dia. 16 mm Ujung 195,000.00
131 Besi Beton Ulir Kg 12,815.00
132 Besi Beton Ulir dia. 14 mm Ujung 136,000.00
133 Besi Beton Ulir dia. 16 mm Ujung 152,125.00
134 Besi Beton Ulir dia. 18 mm Ujung 225,000.00
135 Besi Beton Ulir dia. 20 mm Ujung 379,780.00
136 Besi Beton Ulir dia. 22 mm Ujung 297,500.00
137 Besi Beton Ulir dia. 24 mm Ujung 353,000.00
138 Beton Roster Uk. 20x20 cm Bh 40,000.00
139 Beton Roster Uk. 20x40 cm Bh 50,000.00
140 Ijuk M³ 40,000.00
141 Residu Lt 32,500.00
142 Roster Kaca Uk. 20x20 cm Bh 25,000.00
143 Roster Uk. 20x20 cm (keramik) Bh 25,000.00
144 Roster Uk. 40x40 cm (keramik) Bh 35,000.00
145 Tali ijuk Kg 25,000.00
146 Ampelas Lbr 5,000.00
147 Cat Dasar /Alkali (Dulux/ Setara) Kg 50,000.00
148 Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) Kg 65,000.00
149 Cat Marka Kg 126,710.00
150 Cat Menie Kayu/Besi/Seng (Glotex Setara) Kg 40,000.00
151 Cat Multiguard Kg 175,000.00
152 Cat Tembok (Dulux/ICI setara) Kg 64,000.00
153 Cat Tembok (Metrolite/ Catylac/ Setara) Kg 23,000.00
154 Cat Tembok Biasa Kg 15,000.00

Satuan Jadi 2016 Halaman 38 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
155 Cat Waterproofing (Setara Aquaproof) Kg 50,000.00
156 Chipping Kg 1,200.00
157 Compound Gypsum Kg 10,000.00
158 Dempul Besi Kg 50,000.00
159 Dempul Kayu/Wood Filler (Impra Setara) Kg 40,000.00
160 Kuas Bh 20,000.00
161 Lem Eha-Bond Ltr 35,000.00
162 Minyak Cat / Thiner Ltr 25,000.00
163 Paper Tape M¹ 1,000.00
164 Plamir Kg 50,000.00
165 Plamur Tembok (Danapaint Setara) Kg 18,000.00
166 Politur Ltr 55,000.00
167 Sherlak Kg 50,000.00
168 Soda api Kg 10,000.00
169 Spiritus Ltr 10,000.00
170 Teak oil Ltr 28,250.00
171 Kaca One Way 10 mm M² 1,181,250.00
172 Kaca One Way 5 mm M2 606,375.00
173 Rangka Aluminium 3" coklat Ujg 167,475.00
174 Rangka Aluminium 3" Silver Ujg 144,375.00
175 Rangka Aluminium 4" coklat Ujg 225,225.00
176 Rangka Aluminium 4" Silver Ujg 171,280.00
177 Kayu Bakar M³ 200,000.00
178 Kayu Kelas I (Kayu Besi, dll.) M³ 8,500,000.00
179 Kayu Kelas I (Kayu Linggua,dll.) M³ 8,500,000.00
180 Kayu Kelas II (Kayu Cempaka, dll.) M³ 5,000,000.00
181 Kayu Kelas III (Kayu Nantu, dll.) M³ 3,500,000.00
182 Kayu Kelas IV (Kayu Telon, dll.) M³ 2,000,000.00
183 Perancah kayu M³ 2,000,000.00
184 Asbes Gelombang Besar Lbr 40,000.00
185 Asbes Gelombang Kecil Lbr 26,500.00
186 Atap alumunium gelombang tebal 0.55 mm M² 55,000.00
187 Atap Genteng Metal (setara Multi Roof) M² 68,750.00
188 Atap Genteng Metal (setara Sakura Roof:80 cmX 80 cm) M² 55,000.00
189 Atap Onduline Gelombang 0.95 * 1.95 M M² 157,000.00
190 Atap Spandek Ujg 65,000.00
191 Bubungan Genteng Metal (setara Multi Roof) Bh 47,500.00
192 Bubungan Genteng Metal (setara Sakura Roof) Bh 34,000.00
193 Eternit (Asbes) M² 30,000.00
194 Flashing Genteng Metal (setara Multi Roof) M¹ 30,000.00
195 Flashing Genteng Metal (setara Sakura Roof) M¹ 27,500.00
196 Genteng (setara Genteng Kodok) Bh 35,000.00
197 Genteng Aspal Lbr 70,000.00
198 Genteng Beton Lbr 30,000.00
199 Genteng Kaca Bh 45,000.00
200 Genteng Keramik Bh 30,000.00
201 Genteng Sirap Bh 5,000.00
202 Karpus Asbes Gelombang Besar Lbr 35,000.00
203 Karpus Asbes Gelombang Kecil Lbr 23,000.00
204 Karpus Genteng (setara Genteng Kodok) Bh 17,500.00
205 Karpus Genteng Beton Bh 10,000.00
206 Karpus Genteng Keramik Bh 27,500.00
207 Kaso 3/5 Btg 27,500.00

Satuan Jadi 2016 Halaman 39 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
208 Nok alumunium standar 40 cm 18, swg 22 Lbr 50,000.00
209 Nok genteng beton Bh 35,000.00
210 Nok Samping Genteng Metal (setara Multi Roof) Bh 34,000.00
211 Nok Samping Genteng Metal (setara Sakura Roof) Bh 34,000.00
212 Policarbonate M² 178,265.00
213 Seng Fiberglass Lbr 55,000.00
214 Seng Gelombang Alluminium 0,25 mm Lbr 55,000.00
215 Seng Gelombang Alluminium 0,30 mm Lbr 66,500.00
216 Seng Plat Alluminium 0,25 mm Lbr 55,000.00
217 Seng Plat Alluminium 0,30 mm Lbr 59,500.00
218 Seng Fiberglass Laserlite Plus (uk. 180 x 86 x 0,9 cm) Lbr 80,000.00
219 Seng Gelombang BJLS 20 Lbr 38,000.00
220 Seng Gelombang BJLS 24 Lbr 50,000.00
221 Seng Gelombang BJLS 25 Lbr 57,500.00
222 Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) Lbr 65,000.00
223 Seng Plat BJLS 20 Lbr 58,500.00
224 Seng Plat BJLS 25 Lbr 52,000.00
225 Seng Plat BJLS 30 (uk. 91,4 x 182,9 cm) Lbr 37,500.00
226 Internal cove artistik (5 x5x20) cm Bh 5,905.00
227 Marmer Bh 300,000.00
228 Plint keramik arttistik uk. 10 x 10 cm Bh #N/A
229 Plint keramik arttistik uk. 10 x 20 cm Bh #N/A
230 Shower Screen Aluminium Bh 2,887,500.00
231 Tegel Abu-Abu uk. 20x20 cm Bh 2,000.00
232 Tegel Abu-Abu uk. 30x30 cm Bh 4,700.00
233 Tegel Abu-Abu uk. 40x40 cm Bh 9,500.00
234 Tegel Berwarna uk. 20x20 cm Bh 2,250.00
235 Tegel Berwarna uk. 30x30 cm Bh 5,000.00
236 Tegel Berwarna uk. 40x40 cm Bh 9,500.00
237 Tegel Esenza uk. 40x40 cm Bh 70,000.00
238 Tegel granite dinding 20 x 20 Bh 100,000.00
239 Tegel granite dinding 25 x 50 Bh 125,000.00
240 Tegel granite dinding 25 x 60 Bh 114,000.00
241 Tegel granite dinding 30 x 30 Bh 60,000.00
242 Tegel granite dinding 30 x 60 Bh 30,000.00
243 Tegel granite lantai 20 x 20 Bh 282,500.00
244 Tegel granite lantai 30 x 30 Bh 150,000.00
245 Tegel granite lantai 40 x 40 Bh 100,000.00
246 Tegel granite lantai 50 x 50 Bh 81,000.00
247 Tegel granite lantai 60 x 60 Bh 72,500.00
248 Tegel granite lantai 80 x 80 Bh 50,000.00
249 Tegel Granito uk. 30x30 cm Bh 50,000.00
250 Tegel Granito uk. 40x40 cm Bh 30,000.00
251 Tegel Keramik uk. 10x20 cm Bh 1,250.00
252 Tegel Keramik uk. 10x33 cm Bh 2,200.00
253 Tegel Keramik uk. 11x11 cm Bh 1,100.00
254 Tegel Keramik uk. 15x15 cm Bh 1,800.00
255 Tegel Keramik uk. 15x20 cm Bh 2,000.00
256 Tegel Keramik uk. 20x20 cm Bh 2,250.00
257 Tegel Keramik uk. 20x25 cm Bh 4,200.00
258 Tegel Keramik uk. 25x25 cm Bh 2,500.00
259 Tegel Keramik uk. 30x30 cm Bh 3,975.00
260 Tegel Keramik uk. 30x30 cm antislip Bh 6,500.00

Satuan Jadi 2016 Halaman 40 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
261 Tegel Keramik uk. 33x33 cm Bh 8,900.00
262 Tegel Keramik uk. 33x33 cm anti slip Bh 8,900.00
263 Tegel Keramik uk. 40x40 cm anti slip Bh 13,000.00
264 Tegel mosaik 30 x 30 cm, ex lokal Bh 47,500.00
265 Tegel Plint granito uk. 10x30 cm Bh 30,000.00
266 Tegel Plint granito uk. 10x40 cm Bh 34,000.00
267 Tegel Plint granito uk. 15x30 cm Bh 32,000.00
268 Tegel Plint pc abu-abu uk. 15x30 cm Bh 1,750.00
269 Tegel Plint pc abu-abu uk. 10x30 cm Bh 1,500.00
270 Tegel Plint pc abu-abu uk. 10x40 cm Bh 1,600.00
271 Tegel Plint pc warna uk. 10x40 cm Bh 2,800.00
272 Tegel Plint teralux kerang uk. 10x30 cm Bh 31,000.00
273 Tegel Plint teralux kerang uk. 10x40 cm Bh 31,000.00
274 Tegel Plint teralux kerang uk. 15x30 cm Bh 33,000.00
275 Tegel Plint teralux marmer uk. 10x30 cm Bh 35,000.00
276 Tegel Plint teralux marmer uk. 10x40 cm Bh 36,000.00
277 Tegel Plint teralux marmer uk. 10x60 cm Bh 37,500.00
278 Tegel Plint Teraso uk. 10x30 cm Bh 4,500.00
279 Tegel Plint Teraso uk. 10x40 cm Bh 6,000.00
280 Tegel Plint Teraso uk. 15x30 cm Bh 6,500.00
281 Tegel Plint warna uk. 10x20 cm Bh 2,250.00
282 Tegel Porselin putih uk. 11x11 cm Bh 850.00
283 Tegel teralux kerang uk. 30 x 30 cm Bh 28,000.00
284 Tegel teralux kerang uk. 40 x 40 cm Bh 42,000.00
285 Tegel teralux marmer uk. 40 x 40 cm Bh 85,000.00
286 Tegel teralux marmer uk. 60 x 60 cm Bh 150,000.00
287 Tegel Wafel uk. 20x20 cm Bh 1,650.00
288 Ubin keramik arttistik uk. 10 x 10 cm Bh 3,250.00
289 Ubin keramik arttistik uk. 10 x 20 cm Bh 3,000.00
290 Ubin keramik arttistik uk. 15 x 15 cm Bh 3,000.00
291 Ubin keramik arttistik uk. 5 x 20 cm Bh 3,000.00
292 Ubin tahan asam M² 76,780.00
293 Bak Cuci Stainless Steel (1 Lobang) Bh 450,000.00
294 Bak Cuci Stainless Steel (2 Lobang) Bh 250,000.00
295 Bak Mandi Fiberglass Bh 500,000.00
296 Bathub Bh 3,000,000.00
297 Biofill BF 8 Bh 10,741,500.00
298 Floor Drain Bh 20,000.00
299 Jet Pump Grundfos; Head 50 m; kap. 72 l/dt Unit 1,500,000.00
300 Jet Pump; Head 30 m; kap. 30 l/dt Unit 3,000,000.00
301 Kitchen Set M¹ 1,500,000.00
302 Kloset Duduk Keramik Standar Bh 850,000.00
303 Kloset Jongkok Keramik Standar Bh 175,000.00
304 Kloset Monoblok Lokal Bh 950,000.00
305 Mata Kran Standar 1/2" Bh 56,200.00
306 Mata Kran Standar 3/4" Bh 93,950.00
307 Pipa Galvanis (medium A) dia. 1" M¹ 43,000.00
308 Pipa Galvanis (medium A) dia. 1/2" M¹ 23,000.00
309 Pipa Galvanis (medium A) dia. 2" M¹ 77,000.00
310 Pipa Galvanis (medium A) dia. 3" M¹ 130,000.00
311 Pipa Galvanis (medium A) dia. 3/4" M¹ 32,000.00
312 Pipa Galvanis (medium B) dia. 1" M¹ 18,000.00
313 Pipa Galvanis (medium B) dia. 1/2" M¹ 11,000.00

Satuan Jadi 2016 Halaman 41 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
314 Pipa Galvanis (medium B) dia. 2" M¹ 35,000.00
315 Pipa Galvanis (medium B) dia. 3" M¹ 79,000.00
316 Pipa Galvanis (medium B) dia. 3/4" M¹ 14,000.00
317 Pipa Galvanis Light (biasa) dia. 1" M¹ 15,000.00
318 Pipa Galvanis Light (biasa) dia. 1/2" M¹ 7,500.00
319 Pipa Galvanis Light (biasa) dia. 2" M¹ 24,000.00
320 Pipa Galvanis Light (biasa) dia. 3" M¹ 52,500.00
321 Pipa Galvanis Light (biasa) dia. 3/4" M¹ 10,000.00
322 Pipa Polyethylene (PE) dia. 1" M¹ 12,000.00
323 Pipa Polyethylene (PE) dia. 3/4" M¹ 8,500.00
324 Pipa Polyteline PE dia. 1 1/2" M¹ 28,875.00
325 Pipa Porous M¹ 40,000.00
326 Pipa PVC dia. 1" AW M¹ 9,625.00
327 Pipa PVC dia. 1,5" AW M¹ 17,500.00
328 Pipa PVC dia. 2" AW M¹ 21,250.00
329 Pipa PVC (S-12,5) dia. 1/2" AW M¹ 4,500.00
330 Pipa PVC (S-12,5) dia. 3/4" AW M¹ 4,000.00
331 Pipa PVC dia. 1 1/4" AW M¹ 14,250.00
332 Pipa PVC dia. 1/2" AW M¹ 16,575.00
333 Pipa PVC dia. 3" AW M¹ 41,750.00
334 Pipa PVC dia. 3/4" AW M¹ 7,050.00
335 Pipa PVC dia. 4" AW M¹ 67,250.00
336 Pipa GIP (Medium SII) Ø 12" m¹ 1,318,680.00
337 Pipa GIP (Medium SII) Ø 10" m¹ 986,535.00
338 Pipa GIP (Medium SII) Ø 8" m¹ 701,800.00
339 Pipa GIP (Medium SII) Ø 6" m¹ 484,366.67
340 Pipa GIP (Medium SII) Ø 4" m¹ 302,316.67
341 Pipa GIP (Medium SII) Ø 3" m¹ 208,816.67
342 Pipa GIP (Medium SII) Ø 2" m¹ 126,683.33
343 Pipa PVC S-10 Ø 12" RR m¹ 977,279.17
344 Pipa PVC S-10 Ø 10" RR m¹ 614,304.17
345 Pipa PVC S-10 Ø 8" RR m¹ 395,445.83
346 Pipa PVC S-10 Ø 6" RR m¹ 248,425.00
347 Pipa PVC S-10 Ø 4" RR m¹ 118,416.67
348 Pipa PVC S-10 Ø 3" RR m¹ 79,033.33
349 Pipa PVC S-10 Ø 2" RR m¹ 45,150.00
350 Pipa PVC S-10 Ø 1½" SC m¹ 24,066.67
351 Pipa PVC S-10 Ø 1" SC m¹ 10,583.33
352 Pipa PVC S-10 Ø 3/4" SC m¹ 9,416.67
353 Pipa PVC S-10 Ø 1/2" SC m¹ 6,133.33
354 Pipa PVC S-12,5 Ø 12" RR m¹ 800,608.33
355 Pipa PVC S-12,5 Ø 10" RR m¹ 503,566.67
356 Pipa PVC S-12,5 Ø 8" RR m¹ 322,241.67
357 Pipa PVC S-12,5 Ø 6" RR m¹ 202,741.67
358 Pipa PVC S-12,5 Ø 4" RR m¹ 95,679.17
359 Pipa PVC S-12,5 Ø 3" RR m¹ 66,104.17
360 Pipa PVC S-12,5 Ø 2" RR m¹ 32,225.00
361 Pipa PVC S-12,5 Ø 1½" SC m¹ 24,066.67
362 Pipa PVC S-12,5 Ø 1" SC m¹ 10,583.33
363 Pipa PVC S-12,5 Ø 3/4" SC m¹ 9,416.67
364 Pipa PVC S-12,5 Ø 1/2" SC m¹ 6,133.33
365 Pipa PE S8-SDR17 (PN10) Ø 12" (315 mm) m¹ 1,117,115.00
366 Pipa PE S8-SDR17 (PN10) Ø 10" (250 mm) m¹ 702,100.00

Satuan Jadi 2016 Halaman 42 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
367 Pipa PE S8-SDR17 (PN10) Ø 8" (200 mm) m¹ 451,510.00
368 Pipa PE S8-SDR17 (PN10) Ø 6" (160 mm) m¹ 288,880.00
369 Pipa PE S8-SDR17 (PN10) Ø 4" (110 mm) m¹ 138,130.00
370 Pipa PE S8-SDR17 (PN10) Ø 3" (90 mm) m¹ 92,495.00
371 Pipa PE S8-SDR17 (PN10) Ø 2" (63 mm) m¹ 46,195.00
372 Pipa PE S8-SDR17 (PN10) Ø 1½" (50 mm) m¹ 16,400.00
373 Pipa PE S8-SDR17 (PN10) Ø 11/4" (40 mm) m¹ 14,500.00
374 Pipa PE S8-SDR17 (PN10) Ø 1" (32 mm) m¹ 12,500.00
375 Pipa PE S8-SDR17 (PN10) Ø ¾" (25 mm) m¹ 11,500.00
376 Pipa PE S8-SDR17 (PN10) Ø ½" (20 mm) m¹ 10,000.00
377 Pipa PE S8-SDR17 (PN10) Ø 1½" (50 mm) m¹ 16,400.00
378 Pipa PE S8-SDR17 (PN10) Ø 1" (32 mm) m¹ 12,500.00
379 Pipa PE S8-SDR17 (PN10) Ø 3/4" (25 mm) m¹ 10,400.00
380 Pipa PE S8-SDR17 (PN10) Ø 1/2" (20 mm) m¹ 7,900.00
381 Accessories Gate Valve Double Flanged CI Ø 2" Bh 715,000.00
382 Accessories Gate Valve Double Flanged CI Ø 3" Bh 1,372,800.00
383 Accessories Gate Valve Double Flanged CI Ø 4" Bh 1,960,200.00
384 Accessories Gate Valve Double Flanged CI Ø 6" Bh 3,630,000.00
385 Accessories Gate Valve Double Flanged CI Ø 8" Bh 5,544,000.00
386 Accessories Gate Valve Double Flanged CI Ø 10" Bh 6,652,800.00
387 Accessories Gate Valve Double Flanged CI Ø 12" Bh 9,196,000.00
388 Accessories Stop Kran Ø 100 mm unit 935,000.00
389 Accessories Stop Kran Ø 75 mm unit 550,000.00
390 Accessories Stop Kran Ø 50 mm unit 277,200.00
391 Accessories Stop Kran Ø 25 mm unit 154,000.00
392 Accessories Stop Kran Ø 20 mm unit 57,600.00
393 Accessories Check Valve (Non Return Valve) Ø 4" unit 3,520,000.00
394 Accessories Check Valve (Non Return Valve) Ø 6" unit 4,400,000.00
395 Accessories Check Valve (Non Return Valve) Ø 8" unit 5,280,000.00
396 Accessories Check Valve (Non Return Valve) Ø 10" unit 6,336,000.00
397 Accessories Check Valve (Non Return Valve) Ø 12" unit 7,603,200.00
398 Accessories DF. Water Meter Ø 1/2" unit 269,900.00
399 Accessories DF. Water Meter Ø 2" unit 2,640,000.00
400 Accessories DF. Water Meter Ø 3" unit 3,564,000.00
401 Accessories DF. Water Meter Ø 4" unit 4,488,000.00
402 Accessories DF. Water Meter Ø 6" unit 6,336,000.00
403 Accessories DF. Water Meter Ø 8" unit 8,448,000.00
404 Accessories DF. Water Meter Ø 10" unit 13,200,000.00
405 Accessories DF. Water Meter Ø 12" unit 31,680,000.00
406 Accessories Flanged Air Relief Valve Ø 50 mm unit 880,000.00
407 Accessories Air Vent GIP Ø 3" unit 473,000.00
408 Accessories All Flanged Tee PVC Ø 4" x 4" unit 586,850.00
409 Accessories All Flanged Tee PVC Ø 3" x 3" Bh 522,720.00
410 Accessories All Flanged Tee PVC Ø 3" x 2" Bh 496,584.00
411 Accessories All Flanged Tee CI Ø 12" X 12" Bh 3,960,000.00
412 Accessories All Flanged Tee CI Ø 12" X 8" Bh 3,432,000.00
413 Accessories All Flanged Tee CI Ø 12" X 2" Bh 2,864,400.00
414 Accessories All Flanged Tee CI Ø 12" x 12" Bh 4,455,000.00
415 Accessories All Flanged Tee CI Ø 10" x 10" Bh 2,970,000.00
416 Accessories All Flanged Tee CI Ø 8" x 8" Bh 1,980,000.00
417 Accessories All Flanged Tee CI Ø 6" x 6" Bh 1,320,000.00
418 Accessories All Flanged Tee CI Ø 6" x 4" Bh 1,225,400.00
419 Accessories All Flanged Tee CI Ø 4" x 4" Bh 1,135,200.00

Satuan Jadi 2016 Halaman 43 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
420 Accessories All Flanged Tee CI Ø 4" x 3" Bh 786,500.00
421 Accessories All Flanged Tee CI Ø 4" x 2" Bh 757,900.00
422 Accessories All Flanged Tee CI Ø 3" x 2" Bh 605,000.00
423 Accessories All Flanged Tee CI Ø 2" x 2" Bh 275,000.00
424 Accessories All Flanged Tee Y Cl Ø 12" X 12" Bh 3,916,000.00
425 Accessories Socket Tee PVC (All RR) Ø 6" x 6" Bh 1,107,900.00
426 Accessories Socket Tee PVC (All RR) Ø 6" x 4" Bh 1,095,300.00
427 Accessories Socket Tee PVC (All RR) Ø 4" x 4" Bh 416,100.00
428 Accessories Socket Tee PVC (All RR) Ø 4" x 3" Bh 409,300.00
429 Accessories Socket Tee PVC (All RR) Ø 4" x 2" Bh 404,300.00
430 Accessories Socket Tee PVC (All RR) Ø 3" X 3" Bh 237,600.00
431 Accessories Socket Tee PVC (All RR) Ø 3" X 2" Bh 231,100.00
432 Accessories Socket Tee PVC (All RR) Ø 2" X 2" Bh 174,800.00
433 Accessories Baut Moor 5/8" x 3" Bh 8,800.00
434 Accessories Baut Moor 5/8" x 4" Bh 13,200.00
435 Accessories Blind Flanged Ø 12" Bh 891,000.00
436 Accessories Blind Flanged Ø 8" Bh 715,000.00
437 Accessories Clem Besi Plat Ø 4" X 2 mm Bh 49,500.00
438 Accessories Dop PVC Ø 2" Bh 32,560.00
439 Accessories Dop PVC Ø 3" Bh 58,850.00
440 Accessories Dop PVC Ø 4" Bh 105,600.00
441 Accessories Dop PVC Ø 6" Bh 130,130.00
442 Accessories Double Flanged Bend CI Ø 12" X 11,25º Bh 1,584,000.00
443 Accessories Double Flanged Bend CI Ø 12" X 22,5º Bh 1,672,000.00
444 Accessories Double Flanged Bend CI Ø 12" X 45º Bh 1,925,000.00
445 Accessories Double Flanged Bend CI Ø 12" X 90º Bh 2,757,700.00
446 Accessories Double Flanged Bend CI Ø 8" x 22,5º Bh 473,000.00
447 Accessories Double Flanged Bend CI Ø 8" x 45º Bh 532,400.00
448 Accessories Double Flanged Bend CI Ø 8" x 90º Bh 627,000.00
449 Accessories Double Flanged Bend CI Ø 6" x 22,5º Bh 259,600.00
450 Accessories Double Flanged Bend CI Ø 6" x 45º Bh 308,330.00
451 Accessories Double Flanged Bend CI Ø 6" x 90º Bh 339,900.00
452 Accessories Double Flanged Bend CI Ø 4" x 11,5º Bh 112,200.00
453 Accessories Double Flanged Bend CI Ø 4" x 22,5º Bh 118,800.00
454 Accessories Double Flanged Bend CI Ø 4" x 45º Bh 128,700.00
455 Accessories Double Flanged Bend CI Ø 4" x 90º Bh 139,700.00
456 Accessories Double Flanged Bend CI Ø 3" x 22,5º Bh 71,610.00
457 Accessories Double Flanged Bend CI Ø 3" x 45º Bh 81,510.00
458 Accessories Double Flanged Bend CI Ø 3" x 90º Bh 91,740.00
459 Accessories Double Flanged Bend CI Ø 2" x 22,5º Bh 36,630.00
460 Accessories Double Flanged Bend CI Ø 2" x 45º Bh 39,600.00
461 Accessories Double Flanged Bend CI Ø 2" x 90º Bh 44,770.00
462 Accessories Double Flanged Pipe GIP Ø 3" x 60 cm. Bh 632,280.00
463 Accessories Double Flanged Pipe GIP Ø 3" x 80 cm. Bh 753,720.00
464 Accessories Double Flanged Pipe GIP Ø 3" x 100 cm. Bh 935,880.00
465 Accessories Double Flanged Pipe GIP Ø 3" x 120 cm. Bh 996,600.00
466 Accessories Double Flanged Pipe GIP Ø 3" x 200 cm. Bh 1,543,080.00
467 Accessories Double Flanged Pipe GIP Ø 4" x 60 cm. Bh 524,656.00
468 Accessories Double Flanged Pipe GIP Ø 4" x 80 cm. Bh 638,704.00
469 Accessories Double Flanged Pipe GIP Ø 4" x 100 cm. Bh 809,776.00
470 Accessories Double Flanged Pipe GIP Ø 4" x 120 cm. Bh 866,800.00
471 Accessories Double Flanged Pipe GIP Ø 4" x 180 cm. Bh 1,208,944.00
472 Accessories Flanged Pipe GIP Ø 3" x 60 cm. Bh 543,840.00

Satuan Jadi 2016 Halaman 44 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
473 Accessories Flanged Pipe GIP Ø 3" x 100 cm. Bh 786,720.00
474 Accessories Flanged Pipe GIP Ø 3" x 200 cm. Bh 1,393,920.00
475 Accessories Flanged Pipe GIP Ø 4" x 60 cm. Bh 742,500.00
476 Accessories Flanged Pipe GIP Ø 4" x 100 cm. Bh 1,053,066.67
477 Accessories Flanged Pipe GIP Ø 4" x 200 cm. Bh 1,984,766.67
478 Accessories Flanged Pipe GIP Ø 6" x 60 cm. Bh 1,195,700.00
479 Accessories Flanged Pipe GIP Ø 6" x 80 cm. Bh 1,564,200.00
480 Accessories Flanged Pipe GIP Ø 6" x 100 cm. Bh 1,859,000.00
481 Accessories Flanged Pipe GIP Ø 6" x 200 cm. Bh 3,480,400.00
482 Accessories Double Socket Bend CI for PVC Ø 6" x 11,25º Bh 1,504,800.00
483 Accessories Double Socket Bend CI for PVC Ø 6" x 22,5º Bh 1,518,000.00
484 Accessories Double Socket Bend CI for PVC Ø 6" x 45º Bh 1,610,400.00
485 Accessories Double Socket Bend CI for PVC Ø 6" x 90º Bh 1,768,800.00
486 Accessories Flanged Air Relief Valve Ø 2" Bh 1,685,200.00
487 Accessories Bend Doble Socet PVC Ø 10" X 11,25º Bh 983,600.00
488 Accessories Bend Doble Socet PVC Ø 10" X 22,5º Bh 1,056,400.00
489 Accessories Bend Doble Socet PVC Ø 10" X 45º Bh 1,188,700.00
490 Accessories Bend Doble Socet PVC Ø 10" X 90º Bh 1,517,800.00
491 Accessories Bend Doble Socet PVC Ø 8" x 22,5º Bh 591,100.00
492 Accessories Bend Doble Socet PVC Ø 8" x 45º Bh 666,200.00
493 Accessories Bend Doble Socet PVC Ø 8" x 90º Bh 784,900.00
494 Accessories Bend Doble Socet PVC Ø 6" x 22,5º Bh 324,600.00
495 Accessories Bend Doble Socet PVC Ø 6" x 45º Bh 358,200.00
496 Accessories Bend Doble Socet PVC Ø 6" x 90º Bh 422,300.00
497 Accessories Bend Doble Socet PVC Ø 4" x 11,5º Bh 139,200.00
498 Accessories Bend Doble Socet PVC Ø 4" x 22,5º Bh 148,400.00
499 Accessories Bend Doble Socet PVC Ø 4" x 45º Bh 160,700.00
500 Accessories Bend Doble Socet PVC Ø 4" x 90º Bh 174,800.00
501 Accessories Bend Doble Socet PVC Ø 3" x 22,5º Bh 89,600.00
502 Accessories Bend Doble Socet PVC Ø 3" x 45º Bh 102,000.00
503 Accessories Bend Doble Socet PVC Ø 3" x 90º Bh 114,800.00
504 Accessories Bend Doble Socet PVC Ø 2" x 22,5º Bh 45,900.00
505 Accessories Bend Doble Socet PVC Ø 2" x 45º Bh 49,600.00
506 Accessories Bend Doble Socet PVC Ø 2" x 90º Bh 56,000.00
507 Accessories Flanged Socket PVC RRJ Ø 2" Bh 177,900.00
508 Accessories Flanged Socket PVC RRJ Ø 3" Bh 245,000.00
509 Accessories Flanged Socket PVC RRJ Ø 4" Bh 323,100.00
510 Accessories Flanged Socket PVC RRJ Ø 6" Bh 596,000.00
511 Accessories Flanged Socket PVC RRJ Ø 8" Bh 960,200.00
512 Accessories Flanged Socket PVC RRJ Ø 10" Bh 985,000.00
513 Accessories Flanged Socket PVC RRJ Ø 12" Bh 1,499,400.00
514 Accessories Flanged Spigot PVC Ø 2" Bh 139,370.00
515 Accessories Flanged Spigot PVC Ø 3" Bh 192,940.00
516 Accessories Flanged Spigot PVC Ø 4" Bh 244,640.00
517 Accessories Flanged Spigot PVC Ø 6" Bh 479,820.00
518 Accessories Flanged Spigot PVC Ø 8" Bh 747,120.00
519 Accessories Flanged Spigot PVC Ø 12" Bh 1,108,030.00
520 Accessories Flanged Steel PN 10 Ø 2" Bh 89,100.00
521 Accessories Flanged Steel PN 10 Ø 3" Bh 118,800.00
522 Accessories Flanged Steel PN 10 Ø 4" Bh 165,000.00
523 Accessories Flanged Steel PN 10 Ø 6" Bh 237,600.00
524 Accessories Flanged Steel PN 10 Ø 8" Bh 316,800.00
525 Accessories Flanged Steel PN 10 Ø 10" Bh 380,160.00

Satuan Jadi 2016 Halaman 45 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
526 Accessories Flanged Steel PN 10 Ø 12" Bh 475,200.00
527 Accessories Flanged Strainer CI Ø 3" Bh 1,265,000.00
528 Accessories Flanged Strainer CI Ø 4" Bh 1,650,000.00
529 Accessories Flanged Strainer CI Ø 6" Bh 2,040,500.00
530 Accessories Flanged Strainer CI Ø 8" Bh 2,310,000.00
531 Accessories Fleksible Joint "Tosen" Ø 4 Bh 1,425,600.00
532 Accessories Fleksible Joint "Tosen" Ø 6 Bh 1,782,000.00
533 Accessories Fleksible Joint "Tosen" Ø 8 Bh 2,138,400.00
534 Accessories Fleksible Joint "Tosen" Ø 10 Bh 2,566,080.00
535 Accessories Fleksible Joint "Tosen" Ø 12 Bh 3,079,296.00
536 Accessories Manhole 80 x 80 Cm. unit 495,000.00
537 Accessories Paking Karet Ø 2" Bh 26,620.00
538 Accessories Paking Karet Ø 3" Bh 31,460.00
539 Accessories Paking Karet Ø 4" Bh 47,190.00
540 Accessories Paking Karet Ø 6" Bh 66,000.00
541 Accessories Paking Karet Ø 8" Bh 104,500.00
542 Accessories Paking Karet Ø 10" Bh 123,750.00
543 Accessories Paking Karet Ø 12" Bh 143,000.00
544 Accessories DF Pipa GIP Ø 3" x 60 cm. Bh 455,400.00
545 Accessories DF Pipa GIP Ø 3" x 100 cm. Bh 667,920.00
546 Accessories Pressure Reducing Valve Ø 6" Bh 66,000,000.00
547 Accessories Repair Socket PVC Ø 2" Bh 104,500.00
548 Accessories Socket Repair PVC Ø 6" Bh 550,000.00
549 Accessories Rubber Expansiont Joint Ø 6" Bh 1,914,000.00
550 Accessories Rubber Water Stop 30 Cm Bh 429,000.00
551 Accessories Socket GIP Ø 2" Bh 55,000.00
552 Accessories Socket GIP Ø 3" Bh 77,000.00
553 Accessories Socket GIP Ø 4" Bh 92,400.00
554 Accessories Socket GIP Ø 6" Bh 253,000.00
555 Accessories Socket Reducer PVC (All RR) Ø 3" x 2" Bh 77,600.00
556 Accessories Socket Reducer PVC (All RR) Ø 4" x 3" Bh 131,600.00
557 Accessories Socket Reducer PVC (All RR) Ø 4" x 2" Bh 117,300.00
558 Accessories Socket Reducer PVC (All RR) Ø 6" x 3" Bh 202,800.00
559 Accessories Socket Reducer PVC (All RR) Ø 6" x 4" Bh 232,800.00
560 Accessories Socket Reducer PVC (All RR) Ø 8" x 6" Bh 523,200.00
561 Accessories Socket Reducer PVC (All RR) Ø 10" x 8" Bh 799,100.00
562 Accessories Socket Spigot Bend PVC Ø 12" X 90º Bh 3,880,800.00
563 Accessories Socket Spigot Bend PVC Ø 12" X 45º Bh 3,484,800.00
564 Accessories Socket Spigot Bend PVC Ø 12" X 22,5º Bh 2,822,160.00
565 Accessories Socket Spigot Bend PVC Ø 12" X 11,25º Bh 2,376,000.00
566 Accessories Socket Spigot Bend PVC Ø 8" x 22,5º Bh 982,423.20
567 Accessories Socket Spigot Bend PVC Ø 8" x 45º Bh 1,150,274.40
568 Accessories Socket Spigot Bend PVC Ø 8" x 90º Bh 1,323,062.40
569 Accessories Socket Spigot Bend PVC Ø 6" x 22,5º Bh 525,360.00
570 Accessories Socket Spigot Bend PVC Ø 6" x 45º Bh 615,120.00
571 Accessories Socket Spigot Bend PVC Ø 6" x 90º Bh 707,520.00
572 Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 22,5º Bh 241,560.00
573 Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 45º Bh 260,040.00
574 Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 90º Bh 289,080.00
575 Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 90º Bh 231,000.00
576 Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 45º Bh 204,600.00
577 Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 22,5º Bh 180,840.00
578 Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 90º Bh 136,950.00

Satuan Jadi 2016 Halaman 46 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
579 Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 45º Bh 125,796.00
580 Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 22,5º Bh 112,200.00
581 Accessories Tangki Fiberglass 2 m³ unit 4,400,000.00
582 Accessories Tutup Manhole 0,80 x 0,80 unit 495,000.00
583 Accessories Tutup Manhole 1 x 0,80 unit 935,000.00
584 Accessories Socket Reducer HDPE Ø 10" x 8" Bh 990,200.00
585 Accessories Socket Reducer HDPE Ø 8" x 6" Bh 527,000.00
586 Accessories Socket Reducer HDPE Ø 6" x 4" Bh 361,300.00
587 Accessories Socket Reducer HDPE Ø 4" x 3" Bh 135,800.00
588 Accessories Socket Reducer HDPE Ø 3" x 2" Bh 102,600.00
589 Accessories Elbow With Thread HDPE Ø 10" x 90º Bh 1,482,900.00
590 Accessories Elbow With Thread HDPE Ø 8" x 90º Bh 931,400.00
591 Accessories Elbow With Thread HDPE Ø 6" x 90º Bh 764,000.00
592 Accessories Elbow With Thread HDPE Ø 4" x 90º Bh 375,900.00
593 Accessories Elbow With Thread HDPE Ø 3" x 90º Bh 305,900.00
594 Accessories Elbow With Thread HDPE Ø 2" x 90º Bh 183,000.00
595 Accessories Elbow Pushon Sistem Male HDPE Ø 1" x 90º Bh 49,400.00
596 Accessories Elbow Pushon Sistem Male HDPE Ø 3/4" x 90º Bh 36,800.00
597 Accessories Elbow Pushon Sistem Male HDPE Ø 1/2" x 90º x Bh 29,400.00
598 Accessories Elbow Pushon Sistem Male HDPE Ø 1" x 90º x 20 Bh 27,200.00
599 Accessories Elbow Pushon Sistem Female HDPE Ø 3/4" x 90º Bh 23,600.00
600 Accessories Elbow Pushon Sistem Female HDPE Ø 1/2" x 90º Bh 20,000.00
601 Accessories Fitting Compression Push Fit Bh 20,000.00
602 Accessories Tee HDPE 90º Ø 10" Bh 1,199,300.00
603 Accessories Tee HDPE 90º Ø 8" Bh 833,400.00
604 Accessories Tee HDPE 90º Ø 6" Bh 653,600.00
605 Accessories Tee HDPE 90º Ø 4" Bh 424,800.00
606 Accessories Tee HDPE 90º Ø 3" Bh 362,900.00
607 Accessories Tee HDPE 90º Ø 2" Bh 263,400.00
608 Accessories Bend HDPE 90º Ø 12" Bh 1,710,720.00
609 Accessories Bend HDPE 90º Ø 8" Bh 829,950.00
610 Accessories Bend HDPE 90º Ø 6" Bh 680,680.00
611 Accessories Bend HDPE 90º Ø 4" Bh 334,950.00
612 Accessories Bend HDPE 90º Ø 3" Bh 272,580.00
613 Accessories Bend HDPE 90º Ø 2" Bh 163,020.00
614 Accessories Bend HDPE 45º Ø 10" Bh 1,146,420.00
615 Accessories Bend HDPE 45º Ø 8" Bh 645,260.00
616 Accessories Bend HDPE 45º Ø 6" Bh 521,400.00
617 Accessories Bend HDPE 45º Ø 4" Bh 272,250.00
618 Accessories Bend HDPE 45º Ø 3" Bh 189,310.00
619 Accessories Bend HDPE 45º Ø 2" Bh 112,090.00
620 Accessories Stub End HDPE Ø 10" Bh 1,088,600.00
621 Accessories Stub End HDPE Ø 8" Bh 744,800.00
622 Accessories Stub End HDPE Ø 6" Bh 475,300.00
623 Accessories Stub End HDPE Ø 4" Bh 269,600.00
624 Accessories Stub End HDPE Ø 3" Bh 218,100.00
625 Accessories Stub End HDPE Ø 2" Bh 149,300.00
626 Accessories Flange HDPE Ø 12" Bh 2,444,475.00
627 Accessories Flange HDPE Ø 8" Bh 901,395.00
628 Accessories Flange HDPE Ø 6" Bh 565,290.00
629 Accessories Flange HDPE Ø 4" Bh 366,685.00
630 Accessories Flange HDPE Ø 3" Bh 239,910.00

Satuan Jadi 2016 Halaman 47 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
631 Accessories Flange HDPE Ø 2" Bh 146,685.00
632 Accessories Cap/Dop HDPE Ø 8" Bh 374,385.00
633 Accessories Cap/Dop HDPE Ø 6" Bh 191,510.00
634 Accessories Cap/Dop HDPE Ø 4" Bh 79,475.00
635 Accessories Cap/Dop HDPE Ø 3" Bh 27,170.00
636 Accessories Cap/Dop HDPE Ø 2" Bh 18,095.00
637 Accessories Cap/Dop HDPE Ø 1" Bh 17,160.00
638 Accessories Cap/Dop HDPE Ø 3/4" Bh 13,860.00
639 Accessories Cap/Dop HDPE Ø 1/2" Bh 9,570.00
640 Accessories Clamp Saddle 6" (160 mm) Bh 172,100.00
641 Accessories Clamp Saddle 4" (110 mm) Bh 103,600.00
642 Accessories Clamp Saddle 3" (90 mm) Bh 93,200.00
643 Accessories Clamp Saddle 2" (63 mm) Bh 57,600.00
644 Accessories Clamp Saddle 1½" (50 mm) Bh 45,300.00
645 Accessories Male thread adaptor (MTA) 1" (32 mm) Bh 44,990.00
646 Accessories Male thread adaptor (MTA) 3/4" (25 mm) Bh 34,650.00
647 Accessories Male thread adaptor (MTA) 1/2" (20 mm) Bh 28,050.00
648 Accessories Tap Kran Bh 18,000.00
649 Accessories Box Merer Cover Bh 40,000.00
650 Pompa Air Listrik; Suction 9 m; Head 40 m; kap. 35 l/min Unit 190,000.00
651 Pompa Centrifugal; Head 100 m; kap. 11 l/dt Unit 11,000,000.00
652 Pompa Tangan Dragon Unit 275,000.00
653 Profil Tank Fiberglass orange kap. 1100 ltr. Bh #N/A
654 Profil Tank Fiberglass orange kap. 650 ltr. Bh #N/A
655 Shower Screen Fiber Bh 2,500,000.00
656 Shower Screen Kaca Bh 3,500,000.00
657 Stop Kran 1" Bh 75,000.00
658 Stop Kran 1/2" Bh 35,000.00
659 Stop Kran 2" Bh 155,150.00
660 Stop Kran 3/4" Bh 60,000.00
661 Submersible Deep Well Pump; Head 100 m; kap.1 HP Unit #N/A
662 Submersible Deep Well Pump; Head 70 m; kap.2 HP Unit #N/A
663 Urinoir Keramik Standar Bh 1,375,000.00
664 Wastafel Gantung Keramik Bh 552,480.00
665 Box MCB Unit 35,000.00
666 Down Light Warna 3" Setara Phillips Bh 40,000.00
667 Down Light Warna 4" Setara Phillips Bh 50,000.00
668 Down Light Warna 5" Setara Phillips Bh 80,000.00
669 Down Light Warna 6" Setara Phillips Bh 130,000.00
670 Exhaust Bh 404,250.00
671 Fetting Bh 7,500.00
672 Genset 1300 W Bh 3,457,000.00
673 Genset 2000 W Bh 4,164,000.00
674 Genset 2500 W Bh 5,150,000.00
675 Genset 5000 W Bh 6,507,000.00
676 Genset 6000 W Bh 7,420,000.00
677 Genset 900 W Bh 2,400,000.00
678 Kabel Ravo 2x1,5 mm2 M¹ 8,500.00
679 Kabel Ravo 2x2,5 mm2 M¹ 7,500.00
680 Lampu Downlight 4' Bh 69,300.00
681 Lampu Neon SL 15 Watt Setara Phillips Bh 30,000.00
682 Lampu Neon SL 18 Watt Setara Phillips Bh 32,500.00

Satuan Jadi 2016 Halaman 48 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
683 Lampu Pijar 100 Watt Setara Phillips Bh 8,000.00
684 Lampu Pijar 25 Watt Setara Phillips Bh 5,000.00
685 Lampu Pijar 40 Watt Setara Phillips Bh 6,000.00
686 Lampu Pijar 60 Watt Setara Phillips Bh 7,500.00
687 Lampu TL (Neon) 10 Watt (komplet) Setara Phillips Bh 45,000.00
688 Lampu TL (Neon) 20 Watt (komplet) Setara Phillips Bh 90,000.00
689 Lampu TL (Neon) 40 Watt (komplet) Setara Phillips Bh 120,000.00
690 Main Distribusi Panel (PDM) Unit 3,250.00
691 Saklar Ganda Bh 23,000.00
692 Saklar Stopkontak Bh 25,000.00
693 Saklar Tunggal Bh 20,000.00
694 Sekring Automatik Bh 25,000.00
695 Stop Kontak Bh 20,000.00
696 Alumunium foil M² 50,000.00
697 Carpet M² 76,780.00
698 Carpet 80% wool, 20% nylon M² 94,500.00
699 Feltex carpet 100% wool T-21 M² 165,000.00
700 Floor hardener Kg 27,500.00
701 Gymfloor M² 120,000.00
702 Lem vinyil Kg 27,500.00
703 Lt vinyl karet 30x30 kwl II M² 85,000.00
704 Lt vinyl karet 30x30 kwl l M² 85,000.00
705 Parquet jati M² 180,000.00
706 Underlyer tebal 6 mm/rubber corrugated M² 170,000.00
707 Vinyil Lbr 27,500.00
708 Vinyil asbes Bh 12,500.00
709 Vinyil motif kembang Ex DN Bh 17,500.00
710 Vinyil wall covering lebar 50 cm M² 100,000.00
711 Wallpaper M² 115,000.00
712 Jendela besi M² 750,000.00
713 Jendela besi tahan api M² 900,000.00
714 Kaca Buram 12 mm M² 307,500.00
715 Kaca Buram 5 mm M² 181,000.00
716 Kaca cermin tebal 5 mm M² 164,000.00
717 Kaca cermin tebal 8 mm M² 204,000.00
718 Kaca patri M² 300,000.00
719 Kaca Polos 3 mm M² 123,000.00
720 Kaca Polos 5 mm M² 158,000.00
721 Kaca Polos 8 mm M² 185,000.00
722 Kaca Ray-Band 5 mm M² 226,000.00
723 Kaca wireglass M² 150,000.00
724 Kawat burung M² 17,500.00
725 Kawat Harmonika M² 31,250.00
726 Kawat Nyamuk/Kasa Logam M² 18,750.00
727 Kawat Nyamuk/Kasa Plastik M² 15,000.00
728 Naco (Kerangka dan Daun) M² 472,500.00
729 Pintu besi baja M² 413,440.00
730 Pintu lipat M² 750,000.00
731 Plastik Filter M² 15,000.00
732 Sunscreen alumunium M² 125,000.00
733 Door closer Bh 750,000.00
734 Door holder Bh 250,000.00
735 Door Stop Bh 50,000.00

Satuan Jadi 2016 Halaman 49 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
736 Engsel (setara solid) 3" Bh 20,000.00
737 Engsel (setara solid) 4" Bh 35,000.00
738 Engsel Biasa 2 1/2" Bh 7,500.00
739 Engsel Biasa 3" Bh 10,000.00
740 Engsel Lokal Besar Bh 25,000.00
741 Engsel Nylon Arch 3" Bh 12,200.00
742 Espagnolet Set 62,500.00
743 Formica Lbr 70,000.00
744 Grendel (setara solid) Bh 28,000.00
745 Grendel Lokal Besar Bh 17,500.00
746 Hak Angin Biasa Bh 5,000.00
747 Kait angin Bh 17,500.00
748 Kosen + Pintu PVC Bh 350,000.00
749 Kunci lemari Bh 25,000.00
750 Kunci Pintu Master (setara solid) Bh 225,000.00
751 Kunci Selot Bh 30,000.00
752 Kunci Silinder Putar Bh 75,000.00
753 Kunci Tanam 2 Slag Bh 145,000.00
754 Kunci Tanam 3 Slag Bh 200,000.00
755 Kunci Tanam Biasa Bh 75,000.00
756 Pegangan pintu biasa Bh 50,000.00
757 Pintu alumunium M² 275,000.00
758 Rol pintu dorong Bh 80,000.00
759 Sealent Kg 84,000.00
760 Tarikan Pintu (setara solid) 10" Psg 115,000.00
761 Tarikan Pintu (setara solid) 15" Psg 250,000.00
762 Tarikan Pintu (setara solid) 20" Psg 400,000.00
763 Venetion blinds M² 60,000.00
764 Bambu / Dolken Btg 21,500.00
765 Gypsum 12 mm Lbr 100,000.00
766 Gypsum 9 mm Lbr 60,000.00
767 Kayu Profil 3/3 Ujg 12,000.00
768 Kayu Profil 3/8 Ujg 14,000.00
769 List Profil M' 5,000.00
770 List Profil Gypsum M' 25,000.00
771 Lumbressering Ujg 25,000.00
772 Metal Furing (Rangka Plafond) Ujg 30,000.00
773 Multipleks 4 mm Lbr 55,000.00
774 Multipleks 6 mm Lbr 80,000.00
775 Multipleks 9 mm Lbr 110,000.00
776 Plywood 3 mm Lbr 80,000.00
777 Plywood 4 mm Lbr 85,000.00
778 Plywood 6 mm Lbr 90,000.00
779 Softboard Lbr 60,000.00
780 Teakwood 3x7 Lbr 140,000.00
781 Teakwood 4x8 Lbr 180,000.00
782 Tripleks 3 mm Lbr 52,000.00
783 Tripleks 4 mm Lbr 57,500.00
784 Tripleks 6 mm Lbr 78,000.00
785 Lem Kayu Kg 35,000.00
786 Glass Bit Kg 35,200.00
787 Sabun Kg 17,720.00
788 Polimer Kg 45,000.00

Satuan Jadi 2016 Halaman 50 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
789 Cat Anti Karat Kg 39,390.00
790 Genteng Onduline Lbr 150,000.00
791 Stop Kran 1" PVC Bh 75,000.00
792 Stop Kran 1/2" Besi Bh 35,000.00
793 Stop Kran 2" PVC Bh 155,150.00
794 Stop Kran 3/4" Besi Bh 60,000.00
795 Lampu Taman Kecil Bh 220,400.00
796 Lampu Taman Sedang Bh 526,000.00
797 Lampu Taman Besar Bh 1,236,000.00
798 Poliurythane M2 191,000.00
799 Agregat Pecah Mesin 0-5 mm M3 420,978.60
800 Agregat Pecah Mesin 20-30 mm M3 228,054.09
801 Agregat Pecah Mesin 50-70 mm M3 459,380.00
802 Agregat Pecah Mesin 5-10 & 10-20 mm M3 308,439.30
803 Anchorage buah 1,538,460.00
804 Anti strpping agent liter 57,750.00
805 Arbocell Kg. 36,960.00
806 Asbuton Halus Ton 6,861,860.00
807 Asbuton yang diproses Kg 8,100.00
808 Aspal Emulsi Kg 12,000.00
809 Assetilline Botol 467,780.00
810 Bahan Modifikasi Kg 1,160.00
811 Bahan pengawet: kreosot liter 5,780.00
812 Bahan Pengisi (Filler) Tambahan Kg 1,255.12
813 Baja Bergelombang Kg 24,504.75
814 Baja Prategang Kg 13,860.00
815 Batu Bara Kg 690.00
816 Batu Belah / Kerakal M3 296,200.00
817 Bunker Oil Liter 2,630.00
818 Casing M2 9,000.00
819 Cerucuk M 17,330.00
820 Curing Compound Ltr 38,500.00
821 Ducting (Kabel prestress) M' 173,250.00
822 Ducting (Strand prestress) M' 57,750.00
823 Elastomer Alam Kg 53,200.00
824 Elastomer jenis 1 buah 489,780.00
825 Elastomer jenis 2 buah 825,830.00
826 Elastomer jenis 3 buah 1,064,680.00
827 Elastomer Sintesis Kg 53,200.00
828 Expansion Cap M2 42,390.00
829 Expansion Join Baja Siku M 1,386,000.00
830 Expansion Join Tipe Rubber M 1,188,260.00
831 Expansion Joint Tipe Torma M1 27,000.00
832 Expansion Tipe Joint Asphaltic Plug M 209,640.00
833 Gravel M3 55,000.00
834 Joint Sealent Kg 132,540.00
835 Joint Socket Pile 16x16x16 Set 607,500.00
836 Joint Socket Pile 35x35 Set 229,500.00
837 Kapur M3 245,460.00
838 Kerb jenis 1 Buah 45,000.00
839 Kerb jenis 2 Buah 50,000.00
840 Kerb jenis 3 Buah 55,000.00
841 Kerb Type A Buah 51,980.00

Satuan Jadi 2016 Halaman 51 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
842 Mikro Pile 16x16x16 M1 67,500.00
843 Mini Timber Pile Buah 317,630.00
844 Minyak Fluks Liter 2,394.00
845 Oxygen Botol 265,080.00
846 Additive Ltr 38,500.00
847 Bahan Agr.Base Kelas C2 M3 97,335.00
848 Pasir Halus (untuk HRS) M3 264,660.00
849 Pasir Tailing M3 259,000.00
850 Pasir Urug (ada unsur lempung) M3 52,000.00
851 Strip Bearing Buah 1,200,000.00
852 Tiang Pancang Baja M' 25,247.37
853 Matras Concrete Buah 60,750.00
854 Cat Marka (Non Thermoplas) Kg 95,060.00
855 Polytene 125 mikron Kg 19,250.00
856 Kayu Acuan M3 2,200,000.00
857 Aditif anti pengelupasan Kg 50,000.00
858 Mata Kucing buah 86,630.00
859 PCI Girder L=17m Buah 148,995,000.00
860 PCI Girder L=21m Buah 168,052,500.00
861 PCI Girder L=26m Buah 214,830,000.00
862 PCI Girder L=32m Buah 272,002,500.00
863 PCI Girder L=36m Buah 291,060,000.00
864 PCI Girder L=41m Buah 332,640,000.00
865 Pelat Rambu (Eng. Grade) BH 193,600.00
866 Pelat Rambu (High I. Grade) BH 238,150.00
867 Pemantul Cahaya (Reflector) Bh. 27,000.00
868 Pipa Baja Kg 19,060.00
869 Multipleks 12 mm Lbr 187,000.00
870 Cansteen 15x28x40 Buah #N/A
871 Filler Kg 1,500.00
872 Cat Marka (Thermoplastic) Kg 126,710.00
873 Bahan Agr.Base Kelas A M³ 497,244.28
874 Bahan Agr.Base Kelas B M³ 427,079.53
875 Bahan Agr.Base Kelas C M³ 363,897.74
876 Baja Tulangan (Polos) U24 Kg 11,440.00
877 Baja Tulangan (Ulir) U32 Kg 12,530.00
878 Tiang Pancang Beton Pratekan M³ 423,957.93
879 Baja Tulangan (Polos) U32 Kg 8,400.00
880 Baja Tulangan (Ulir) U39 Kg 8,450.00
881 Baja Tulangan (Ulir) U48 Kg 9,000.00
882 Pipa Galvanis Dia 1,5" M¹ 75,000.00
883 Profil Alumunium Swing Door 6 M Tiang Polos Bh 230,000.00
884 Profil Alumunium Swing Door 4,4 M Tiang Polos Bh 170,000.00
885 Profil Alumunium Swing Door 6 M Tiang Moher Bh 240,000.00
886 Profil Alumunium Swing Door 4,4 M Tiang Moher Bh 180,000.00
887 Profil Alumunium Swing Door Ambang Atas Bh 210,000.00
888 Profil Alumunium Swing Door Ambang Bawah Bh 315,000.00

Satuan Jadi 2016 Halaman 52 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
889 Profil Alumunium Swing Door Tutup Ambang Bh 50,000.00
890 Profil Alumunium Swing Door Skoneng (Besar) Bh 60,000.00
891 Profil Alumunium Swing Door 6 M Tiang Sliding Bh 120,000.00
892 Profil Alumunium Swing Door 4,4 M Tiang Sliding Bh 82,000.00
893 Profil Alumunium Swing Door 6 M Tiang Sliding Kait Bh 120,000.00
894 Profil Alumunium Swing Door 4,4 M Tiang Sliding Kait Bh 88,000.00
895 Profil Alumunium Shop Front 1½ X 3 " (M) Bh 140,000.00
896 Profil Alumunium Shop Front 1½ X 3 " (Open Back) Bh 134,000.00
897 Profil Alumunium Shop Front 1½ X 3 " (Jip/Tangga) Bh 140,000.00
898 Profil Alumunium Shop Front 1½ X 3 " (Tutup Jip/Tangga) Bh 55,000.00
899 Profil Alumunium Shop Front 1½ X 3 " (Tutup Kaca Mati) Bh 75,000.00
900 Profil Alumunium Shop Front 1½ X 3 " (Tutup Kaca Polos) Bh 50,000.00
901 Profil Alumunium Shop Front 1⅞ X 4 " (M) Bh 205,500.00
902 Profil Alumunium Shop Front 1⅞ X 4 " (Open Back) Bh 191,000.00
903 Profil Alumunium Shop Front 1⅞ X 4 " (Jip/Tangga) Bh 200,000.00
904 Profil Alumunium Shop Front 1⅞ X 4 " (Tutup Kaca Mati) Bh 105,000.00
905 Profil Alumunium Casement (Frame) Bh 195,000.00
906 Profil Alumunium Casement (Skoneng) Bh 195,000.00
907 A.A Sliding Bh 94,000.00
908 A.B Sliding Bh 148,000.00
909 R.A Sliding Bh 149,000.00
910 R.S Sliding 4,4 M Bh 71,000.00
911 R.S Sliding 6 M Bh 96,000.00
912 R.B Sliding Bh 120,000.00
913 Tiang Sliding Ekon Bh 73,000.00
914 Tiang Sliding Kait Ekon Bh 87,000.00
915 A.A Sliding Ekonomi Bh 70,000.00
916 A.B Sliding Ekonomi Bh 98,000.00
917 R.A Sliding Door Bh 120,000.00
918 R.S Slid Ekonomi Bh 66,000.00
919 R.B Sliding Door Bh 94,000.00
920 Troling Full Bh 127,000.00
921 U. Roling Bh 86,000.00
922 Center Post 10 Bh 200,000.00
923 Center Post 11,4 Bh 241,000.00
924 M Skrup 3 Bh 175,000.00
925 M Skrup 4 Bh 230,000.00
926 Hollow 1/2 X 3/4 Bh 32,000.00
927 Down Roling Full Bh 55,000.00
928 Down Roling Kunci Bh 47,000.00

Satuan Jadi 2016 Halaman 53 dari 127 halaman


HARGA
NO. JENIS BAHAN SATUAN KET
(Rp.)
929 Cuartain Wall (5303) Bh 174,000.00
930 Cuartain Wall (5304) Bh 77,000.00
931 Cuartain Wall (5305) Bh 159,000.00
932 Baja Struktur Kg 20,000.00
933 Perlengkapan Ls 200.00
934 Semen tahan Asam Kg 2,000.00
935
936
937
938
939
940
941
942
943

Catatan :
- Sesuai harga yang berlaku dipasaran.
- Harga satuan belum termasuk pajak yang berlaku.
- Harga sewaktu-waktu bisa berubah

Satuan Jadi 2016 Halaman 54 dari 127 halaman


LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Nomor :
Tanggal :
Tentang : Penetapan Standardisasi Harga Satuan Jadi
di lingkungan Pemerintah Kota Manado T.A. 2016

DAFTAR HARGA SATUAN ALAT

NO. JENIS ALAT SATUAN JUMLAH (Rp.)


1 Aggregat (Chip) Spreader Jam Kerja 619,248.62
2 Aspahlt Tanker Jam Kerja 650,919.37
3 Asphalt Distributor Jam Kerja 437,643.25
4 Asphalt Finisher Jam Kerja 954,442.58
5 Asphalt Liquid Mixer Jam Kerja 54,910.39
6 Asphalt Mixing Plant (AMP) Jam Kerja 9,093,855.59
7 Asphalt Sprayer Jam Kerja 80,068.59
8 Blending Equipment Jam Kerja 264,680.17
9 Bore Pile Machine Jam Kerja 869,670.69
10 Bulldozer 100-150 HP Jam Kerja 839,574.61
11 Cement Tanker Jam Kerja 596,259.37
12 Chainsaw Jam Kerja 43,775.00
13 Cold Milling Jam Kerja 330,386.76
14 Cold Recycler Jam Kerja 6,620,767.89
15 Compressor 4000-6500 L\M Jam Kerja 206,779.19
16 Concrete Breaker Jam Kerja 967,779.98
17 Concrete Mixer 0.3-0.6 M³ Jam Kerja 99,660.46
18 Concrete Pan Mixer Jam Kerja 189,600.07
19 Concrete Pump Jam Kerja 742,237.07
20 Concrete Vibrator Jam Kerja 300,705.21
21 Condrete Mixer (350) Jam Kerja 57,520.53
22 Crane 10-15 Ton Jam Kerja 703,579.91
23 Crane On Track 35 Ton Jam Kerja 515,435.54
24 Crane On Track 75-100 Ton Jam Kerja 718,108.69
25 Dump Truck 10 Ton Jam Kerja 572,317.91
26 Dump Truck 3.5 Ton Jam Kerja 304,130.78
27 Excavator 80-140 Hp Jam Kerja 638,909.42
28 Flat Bed Truck 3-4 M³ Jam Kerja 565,719.91
29 Fulvi Mixer Jam Kerja 1,522,855.82
30 Generator Set Jam Kerja 513,973.20
31 Hot Recycler Jam Kerja 7,635,216.84

Satuan Jadi 2016 Halaman55 dari 127


32 Jack Hammer Jam Kerja 47,194.27
33 Motor Grader >100 HP Jam Kerja 736,668.69
34 Pedestrian Roller Jam Kerja 103,436.20
35 Pile Driver + Hammer Jam Kerja 296,432.22
36 Rock Drill Breaker Jam Kerja 1,781,936.99
37 Slip Form Paver Jam Kerja 606,183.11
38 Stone Crusher Jam Kerja 808,590.94
39 Tamper Jam Kerja 61,977.24
40 Tandem Roller 6-8 T. Jam Kerja 504,341.19
41 Three Wheel Roller 6-8 T Jam Kerja 249,122.82
42 Tire Roller 8-10 T. Jam Kerja 481,567.34
43 Track Loader 75-100 Hp Jam Kerja 328,166.42
44 Trailer 20 Ton Jam Kerja 581,657.21
45 Tronton Jam Kerja 530,728.76
46 Truk Mixer (Agitator) Jam Kerja 731,760.86
47 Vibrating Rammer Jam Kerja 62,080.14
48 Vibratory Roller 5-8 T. Jam Kerja 451,596.74
49 Water Pump 70-100 mm Jam Kerja 54,990.52
50 Water Tanker 3000-4500 L. Jam Kerja 300,741.40
51 Welding Set Jam Kerja 138,331.99
52 Wheel Loader 1.0-1.6 M³ Jam Kerja 588,594.06
53 Pick UP Jam Kerja 208,943.64
54 Excavator Mini PC 50 Jam Kerja 331,959.55
55 Alat Bantu Ls 200.00

Catatan :
- Sesuai harga yang berlaku dipasaran.
- Harga satuan belum termasuk pajak yang berlaku.
- Harga sewaktu-waktu bisa berubah

#REF! #REF!
#REF! #REF!
#REF!

#REF! #REF!
#REF! #REF!

Satuan Jadi 2016 Halaman56 dari 127


DAFTAR ANALISA BIAYA KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN
Sesuai Standar Nasional Indonesia

NO URAIAN PEKERJAAN KOEFISIEN SATUAN HARGA SATUAN JUMLAH HARGA


(Rp.) (Rp.)

I. PEKERJAAN PERSIAPAN RSNI T-12-2002

1 1 m¹ Pagar sementara dari kayu tinggi 2 meter

Bambu / Dolken 1.250 Btg 21,500.00 26,875.00


Semen PC 2.500 Kg 1,333.47 3,333.68
Pasir Pasang / Beton 0.005 M³ 240,600.00 1,203.00
Kerikil Beton 0.009 M³ 333,100.00 2,997.90
Kayu Kelas III (Kayu Nantu, dll.) 0.072 M³ 3,500,000.00 252,000.00
Paku Kayu 2" s/d 6" 0.060 Kg 18,000.00 1,080.00
Residu 0.400 Lt 32,500.00 13,000.00

Tukang Kayu 0.200 Hari / Org 125,000.00 25,000.00


Pekerja 0.400 Hari / Org 100,000.00 40,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.020 Hari / Org 120,000.00 2,400.00
370,889.58
Over Head, Keuntungan, Dll

Biaya untuk 1 M' Jumlah 370,889.58

2 1 m¹ Pagar sementara dari seng gelombang tinggi 2 meter

Bambu / Dolken 1.250 Btg 21,500.00 26,875.00


Semen PC 2.500 Kg 1,333.47 3,333.68
Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) 1.200 Lbr 65,000.00 78,000.00
Pasir Pasang / Beton 0.005 M³ 240,600.00 1,203.00
Kerikil Beton 0.009 M³ 333,100.00 2,997.90
Kayu Kelas III (Kayu Nantu, dll.) 0.072 M³ 3,500,000.00 252,000.00
Paku Kayu 2" s/d 6" 0.060 Kg 18,000.00 1,080.00
Cat Menie Kayu/Besi/Seng (Glotex Setara) 0.450 Kg 40,000.00 18,000.00

Tukang Kayu 0.200 Hari / Org 125,000.00 25,000.00


Pekerja 0.400 Hari / Org 100,000.00 40,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.020 Hari / Org 120,000.00 2,400.00
453,889.58
Over Head, Keuntungan, Dll

Biaya untuk 1 M' Jumlah 453,889.58

3 1 m¹ Pagar sementara dari kawat duri tinggi 1.8 meter

Bambu / Dolken 1.000 Btg 21,500.00 21,500.00


Semen PC 2.000 Kg 1,333.47 2,666.95
Kawat duri 25.000 Kg 60,000.00 1,500,000.00
Pasir Pasang / Beton 0.005 M³ 240,600.00 1,203.00
Kerikil Beton 0.009 M³ 333,100.00 2,997.90
Paku Kayu 2" s/d 6" 0.060 Kg 18,000.00 1,080.00

Tukang Kayu 0.200 Hari / Org 125,000.00 25,000.00


Pekerja 0.300 Hari / Org 100,000.00 30,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.020 Hari / Org 120,000.00 2,400.00
1,589,847.85
Over Head, Keuntungan, Dll

Biaya untuk 1 M' 1,589,847.85

Harga Satuan Dinas PU Manado 2017 Halaman 57 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

4 1 m¹ Pengukuran dan Pemasangan Bouwplank

Kayu Kelas III (Kayu Nantu, dll.) 0.012 M³ 3,500,000.00 42,000.00


Paku Kayu 2" s/d 6" 0.020 Kg 18,000.00 360.00
Kayu Kelas IV (Kayu Telon, dll.) 0.007 M³ 2,000,000.00 14,000.00

Tukang Kayu 0.100 Hari / Org 125,000.00 12,500.00


Pekerja 0.100 Hari / Org 100,000.00 10,000.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.005 Hari / Org 120,000.00 600.00
80,960.00
Over Head, Keuntungan, Dll

Biaya untuk 1 M' 80,960.00

5 1 m² Pembuatan kantor sementara, dengan lantai plesteran

Bambu / Dolken 1.250 Btg 21,500.00 26,875.00


Kayu Kelas III (Kayu Nantu, dll.) 0.180 M³ 3,500,000.00 630,000.00
Kayu Kelas IV (Kayu Telon, dll.) 0.850 M³ 2,000,000.00 1,700,000.00
Besi strip 1.100 Kg 88,000.00 96,800.00
Semen PC 35.000 Kg 1,333.47 46,671.58
Pasir Pasang / Beton 0.150 M³ 240,600.00 36,090.00
Pasir Pasang / Beton 0.100 M³ 240,600.00 24,060.00
Kerikil Beton 0.150 M³ 333,100.00 49,965.00
Bata merah 30.000 Bh 850.00 25,500.00
Seng Plat BJLS 20 0.250 Lbr 58,500.00 14,625.00
Naco (Kerangka dan Daun) 2.000 M² 472,500.00 945,000.00
Kaca Polos 3 mm 0.080 M² 123,000.00 9,840.00
Kunci Tanam 2 Slag 0.150 Bh 145,000.00 21,750.00
Plywood 4 mm 0.060 Lbr 85,000.00 5,100.00

Tukang Kayu 2.000 Hari / Org 125,000.00 250,000.00


Tukang batu 1.000 Hari / Org 125,000.00 125,000.00
Pekerja 2.000 Hari / Org 100,000.00 200,000.00
Kepala Tukang 0.300 Hari / Org 150,000.00 45,000.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
4,258,276.58
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 4,258,276.58

6 1 m² Pembuatan gudang semen dan alat-alat

Bambu / Dolken 1.700 Btg 21,500.00 36,550.00


Kayu Kelas III (Kayu Nantu, dll.) 0.210 M³ 3,500,000.00 735,000.00
Semen PC 10.500 Kg 1,333.47 14,001.47
Pasir Pasang / Beton 0.030 M³ 240,600.00 7,218.00
Kerikil Beton 0.050 M³ 333,100.00 16,655.00
Paku Kayu 2" s/d 6" 0.300 Kg 18,000.00 5,400.00
Seng Gelombang BJLS 20 1.500 Lbr 38,000.00 57,000.00

Tukang Kayu 2.000 Hari / Org 125,000.00 250,000.00


Pekerja 1.000 Hari / Org 100,000.00 100,000.00
Kepala Tukang 0.200 Hari / Org 150,000.00 30,000.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
1,257,824.47
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 1,257,824.47

7 1 m² Pembuatan rumah jaga/konstruksi kayu

Bambu / Dolken 3.000 Btg 21,500.00 64,500.00


Kayu Kelas III (Kayu Nantu, dll.) 0.276 M³ 3,500,000.00 966,000.00
Paku Kayu 2" s/d 6" 0.700 Kg 18,000.00 12,600.00
Seng Gelombang BJLS 20 1.500 Lbr 38,000.00 57,000.00

Tukang Kayu 1.500 Hari / Org 125,000.00 187,500.00


Pekerja 1.000 Hari / Org 100,000.00 100,000.00
Kepala Tukang 0.150 Hari / Org 150,000.00 22,500.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
1,416,100.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 1,416,100.00

8 1 m² Membersihkan lapangan dan perataan

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Mandor 0.050 Hari / Org 120,000.00 6,000.00
16,000.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 16,000.00

Harga Satuan Dinas PU Manado 2017 Halaman 58 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

9 1 m² Pembuatan bedeng buruh

Bambu / Dolken 1.250 Btg 21,500.00 26,875.00


Kayu Kelas III (Kayu Nantu, dll.) 0.186 M³ 3,500,000.00 651,000.00
Paku Kayu 2" s/d 6" 0.300 Kg 18,000.00 5,400.00
Semen PC 18.000 Kg 1,333.47 24,002.53
Pasir Pasang / Beton 0.030 M³ 240,600.00 7,218.00
Kerikil Beton 0.050 M³ 333,100.00 16,655.00
Seng Gelombang BJLS 20 1.500 Lbr 38,000.00 57,000.00
Plywood 4 mm 1.350 Lbr 85,000.00 114,750.00

Tukang Kayu 2.000 Hari / Org 125,000.00 250,000.00


Pekerja 1.000 Hari / Org 100,000.00 100,000.00
Kepala Tukang 0.200 Hari / Org 150,000.00 30,000.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
1,288,900.53
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 1,288,900.53

10 1 m² Pembuatan bak adukan ukuran (40 x 50 x 20) cm

Kayu Kelas III (Kayu Nantu, dll.) 0.036 M³ 3,500,000.00 126,000.00


Paku Kayu 2" s/d 6" 0.080 Kg 18,000.00 1,440.00
Kaso 3/5 1.000 Btg 27,500.00 27,500.00

Tukang Kayu 0.300 Hari / Org 125,000.00 37,500.00


Mandor 0.002 Hari / Org 120,000.00 180.00
192,620.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 192,620.00

11 1 m²
Pembuatan Stegger dari bambu, ukuran (40 x 50 x 20) cm

Bambu / Dolken 1.000 Btg 21,500.00 21,500.00


Tali ijuk 0.250 Kg 25,000.00 6,250.00

Tukang Kayu 0.017 Hari / Org 125,000.00 2,125.00


Pekerja 0.250 Hari / Org 100,000.00 25,000.00
Kepala Tukang 0.002 Hari / Org 150,000.00 300.00
Mandor 0.013 Hari / Org 120,000.00 1,560.00
56,735.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 56,735.00

12 1 m² Pembuatan jalan sementara

Batu Belah Uk. 15 - 20 0.150 M³ 296,200.00 44,430.00


Agregat Pecah Mesin 50-70 mm 0.090 M3 459,380.00 41,344.20
Pasir Pasang / Beton 0.010 M³ 240,600.00 2,406.00

Pekerja 1.000 Hari / Org 100,000.00 100,000.00


Mandor 0.050 Hari / Org 120,000.00 6,000.00
194,180.20
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 194,180.20

13 1 m³ Bongkaran beton bertulang

Pekerja 6.667 Hari / Org 100,000.00 666,700.00


Mandor 0.333 Hari / Org 120,000.00 39,960.00
706,660.00
Over Head, Keuntungan, Dll 70,666.00

Biaya Untuk 1 M3 777,326.00

14 1 m³ Bongkaran dinding tembok bata merah

Pekerja 6.667 Hari / Org 100,000.00 666,700.00


Mandor 0.333 Hari / Org 120,000.00 39,960.00
706,660.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 706,660.00

15 1 m¹ Pasang pagar kawat jaring galvanis, tinggi 1.00 m

Kawat jaring galvanis 0.434 M¹ 40,000.00 17,360.00

Tukang 0.042 Hari / Org 125,000.00 5,250.00


Pekerja 0.042 Hari / Org 100,000.00 4,200.00
Kepala Tukang 0.004 Hari / Org 150,000.00 600.00
Mandor 0.002 Hari / Org 120,000.00 240.00
27,650.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 27,650.00

II. PEKERJAAN TANAH SNI 2835:2008

1 1 m³ Galian tanah biasa sedalam 1 meter

Harga Satuan Dinas PU Manado 2017 Halaman 59 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pekerja 0.750 Hari / Org 100,000.00 75,000.00


Mandor 0.025 Hari / Org 120,000.00 3,000.00
78,000.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 78,000.00

2 1 m³ Galian tanah biasa sedalam 2 meter

Pekerja 0.900 Hari / Org 100,000.00 90,000.00


Mandor 0.045 Hari / Org 120,000.00 5,400.00
95,400.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 95,400.00

3 1 m³ Galian tanah biasa sedalam 3 meter

Pekerja 1.050 Hari / Org 100,000.00 105,000.00


Mandor 0.067 Hari / Org 120,000.00 8,040.00
113,040.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 113,040.00

4 1 m³ Galian tanah keras sedalam 1 meter

Pekerja 1.000 Hari / Org 100,000.00 100,000.00


Mandor 0.032 Hari / Org 120,000.00 3,840.00
103,840.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 103,840.00

5 1 m³ Galian tanah cadas sedalam 1 meter

Pekerja 1.500 Hari / Org 100,000.00 150,000.00


Mandor 0.060 Hari / Org 120,000.00 7,200.00
157,200.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 157,200.00

6 1 m³ Galian tanah lumpur sedalam 1 meter

Pekerja 1.200 Hari / Org 100,000.00 120,000.00


Mandor 0.045 Hari / Org 120,000.00 5,400.00
125,400.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 125,400.00

Harga Satuan Dinas PU Manado 2017 Halaman 60 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

7 1 m² Pekerjaan stripping setinggi 1 meter

Pekerja 0.050 Hari / Org 100,000.00 5,000.00


Mandor 0.005 Hari / Org 120,000.00 600.00
5,600.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 5,600.00

8 1 m³ Pembuangan tanah sejauh 30 meter 1 m3 Pembuangan

Pekerja 0.330 Hari / Org 100,000.00 33,000.00


Mandor 0.010 Hari / Org 120,000.00 1,200.00
34,200.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 34,200.00

9 1 m³ Urugan kembali

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Mandor 0.008 Hari / Org 120,000.00 1,000.00
26,000.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 26,000.00

10 1 m³ Pemadatan tanah (per 20 cm)

Pekerja 0.500 Hari / Org 100,000.00 50,000.00


Mandor 0.050 Hari / Org 120,000.00 6,000.00
56,000.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 56,000.00

11 1 m³ Timbunan tanah dan pemadatan ( manual )

Tanah Biasa 1.200 M³ 60,000.00 72,000.00

Pekerja 0.420 Hari / Org 100,000.00 42,000.00


Mandor 0.014 Hari / Org 120,000.00 1,680.00
115,680.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 115,680.00

12 1 m³ Urugan pasir

Pasir Kasar/ Urug 1.200 M³ 52,000.00 62,400.00

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Mandor 0.010 Hari / Org 120,000.00 1,200.00
93,600.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 93,600.00

13 1 m³ Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL

Pasir Kasar/ Urug 0.330 M³ 52,000.00 17,160.00


Kapur padam 0.109 M³ 245,460.00 26,755.14
Tanah liat 0.763 M³ 60,000.00 45,780.00

Pekerja 0.833 Hari / Org 100,000.00 83,300.00


Tukang batu 0.416 Hari / Org 125,000.00 52,000.00
Kepala Tukang 0.040 Hari / Org 150,000.00 6,000.00
Mandor 0.083 Hari / Org 120,000.00 9,960.00
240,955.14
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 240,955.14

Harga Satuan Dinas PU Manado 2017 Halaman 61 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

14 1 m³ Lapisan pudel campuran 1 Kp : 5 TL

Kapur padam 0.200 M³ 245,460.00 49,092.00


Tanah liat 1.000 M³ 60,000.00 60,000.00

Pekerja 0.833 Hari / Org 100,000.00 83,300.00


Tukang batu 0.416 Hari / Org 125,000.00 52,000.00
Kepala Tukang 0.041 Hari / Org 150,000.00 6,150.00
Mandor 0.081 Hari / Org 120,000.00 9,720.00
260,262.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 260,262.00

15 1 m³ Pemasangan lapisan ijuk

Ijuk 6.000 M³ 40,000.00 240,000.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Mandor 0.015 Hari / Org 120,000.00 1,800.00
256,800.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 256,800.00

16 1 m³ Urugan sirtu

Sirtu Alam 1.200 M³ 225,000.00 270,000.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Mandor 0.025 Hari / Org 120,000.00 3,000.00
298,000.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 298,000.00

17 1 m² Pembuatan jalan sementara, tebal 25 cm

Batu Belah Uk. 15 - 20 0.275 M³ 296,200.00 81,455.00


Kerikil Koral Uk. 1 - 3 cm 0.030 M³ 326,015.00 9,780.45
Pasir Kasar/ Urug 0.050 M³ 52,000.00 2,600.00

Pekerja 1.000 Hari / Org 100,000.00 100,000.00


Mandor 0.100 Hari / Org 120,000.00 12,000.00
205,835.45
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 205,835.45

III. PEKERJAAN PONDASI

1 1 m³ Pasang pondasi batu kali, 1 Pc : 3 Ps

Batu Belah Uk. 15 - 20 1.200 M³ 296,200.00 355,440.00


Semen PC 202.000 Kg 1,333.47 269,361.70
Pasir Pasang / Beton 0.485 M³ 240,600.00 116,691.00

Pekerja 1.500 Hari / Org 100,000.00 150,000.00


Tukang batu 0.750 Hari / Org 125,000.00 93,750.00
Kepala Tukang 0.075 Hari / Org 150,000.00 11,250.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
1,005,492.70
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,005,492.70

2 1 m³ Pasang pondasi batu kali, 1 Pc : 4 Ps

Batu Belah Uk. 15 - 20 1.200 M³ 296,200.00 355,440.00


Semen PC 163.000 Kg 1,333.47 217,356.22
Pasir Pasang / Beton 0.520 M³ 240,600.00 125,112.00

Pekerja 1.500 Hari / Org 100,000.00 150,000.00


Tukang batu 0.750 Hari / Org 125,000.00 93,750.00
Kepala Tukang 0.075 Hari / Org 150,000.00 11,250.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
961,908.22
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 961,908.22

Harga Satuan Dinas PU Manado 2017 Halaman 62 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

3 1 m³ Pasang pondasi batu kali, 1 Pc : 5 Ps

Batu Belah Uk. 15 - 20 1.200 M³ 296,200.00 355,440.00


Semen PC 136.000 Kg 1,333.47 181,352.43
Pasir Pasang / Beton 0.544 M³ 240,600.00 130,886.40

Pekerja 1.500 Hari / Org 100,000.00 150,000.00


Tukang batu 0.750 Hari / Org 125,000.00 93,750.00
Kepala Tukang 0.075 Hari / Org 150,000.00 11,250.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
931,678.83
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 931,678.83

4 1 m³ Pasang pondasi batu kali, 1 Pc : 6 Ps

Batu Belah Uk. 15 - 20 1.100 M³ 296,200.00 325,820.00


Semen PC 117.000 Kg 1,333.47 156,016.43
Pasir Pasang / Beton 0.561 M³ 240,600.00 134,976.60

Pekerja 1.500 Hari / Org 100,000.00 150,000.00


Tukang batu 0.600 Hari / Org 125,000.00 75,000.00
Kepala Tukang 0.060 Hari / Org 150,000.00 9,000.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
859,813.03
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 859,813.03

5 1 m³ Pasang pondasi batu kali, 1 Pc : 8 Ps

Batu Belah Uk. 15 - 20 1.100 M³ 296,200.00 325,820.00


Semen PC 91.000 Kg 1,333.47 121,346.11
Pasir Pasang / Beton 0.561 M³ 240,600.00 134,976.60

Pekerja 1.500 Hari / Org 100,000.00 150,000.00


Tukang batu 0.600 Hari / Org 125,000.00 75,000.00
Kepala Tukang 0.060 Hari / Org 150,000.00 9,000.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
825,142.71
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 825,142.71

6 1 m³ Pasang pondasi batu kali, 1 Kp : 1 Sm : 2 Ps

Batu Belah Uk. 15 - 20 1.100 M³ 296,200.00 325,820.00


Kapur 0.170 M3 245,460.00 41,728.20
Semen Warna 0.170 Kg 12,000.00 2,040.00
Pasir Pasang / Beton 0.340 M³ 240,600.00 81,804.00

Pekerja 1.500 Hari / Org 100,000.00 150,000.00


Tukang batu 0.600 Hari / Org 125,000.00 75,000.00
Kepala Tukang 0.060 Hari / Org 150,000.00 9,000.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
694,392.20
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 694,392.20

7 1 m³ Pasang pondasi batu kali, 1 Pc : 1/4 Kp : 4 Ps

Batu Belah Uk. 15 - 20 1.100 M³ 296,200.00 325,820.00


Semen PC 156.000 Kg 1,333.47 208,021.91
Kapur 0.032 M3 245,460.00 7,854.72
Pasir Pasang / Beton 0.584 M³ 240,600.00 140,510.40

Pekerja 1.500 Hari / Org 100,000.00 150,000.00


Tukang batu 0.600 Hari / Org 125,000.00 75,000.00
Kepala Tukang 0.060 Hari / Org 150,000.00 9,000.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
925,207.03
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 925,207.03

8 1 m³ Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps

Batu Belah Uk. 15 - 20 1.100 M³ 296,200.00 325,820.00


Semen PC 61.000 Kg 1,333.47 81,341.90
Kapur 0.147 M3 245,460.00 36,082.62
Pasir Pasang / Beton 0.492 M³ 240,600.00 118,375.20

Pekerja 1.500 Hari / Org 100,000.00 150,000.00


Tukang batu 0.600 Hari / Org 125,000.00 75,000.00
Kepala Tukang 0.060 Hari / Org 150,000.00 9,000.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
804,619.72
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 804,619.72

Harga Satuan Dinas PU Manado 2017 Halaman 63 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

9 1 m³ Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps

Batu Belah Uk. 15 - 20 1.100 M³ 296,200.00 325,820.00


Semen PC 41.000 Kg 1,333.47 54,672.42
Kapur 0.131 M3 245,460.00 32,155.26
Pasir Pasang / Beton 0.523 M³ 240,600.00 125,833.80

Pekerja 1.500 Hari / Org 100,000.00 150,000.00


Tukang batu 0.600 Hari / Org 125,000.00 75,000.00
Kepala Tukang 0.060 Hari / Org 150,000.00 9,000.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
781,481.48
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 781,481.48

10 1 m³ Pasang pondasi batu kosong

Batu Belah Uk. 15 - 20 1.200 M³ 296,200.00 355,440.00


Pasir Pasang / Beton 0.432 M³ 240,600.00 103,939.20

Pekerja 0.780 Hari / Org 100,000.00 78,000.00


Tukang batu 0.390 Hari / Org 125,000.00 48,750.00
Kepala Tukang 0.039 Hari / Org 150,000.00 5,850.00
Mandor 0.039 Hari / Org 120,000.00 4,680.00
596,659.20
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 596,659.20

11 1 m³ Pasang pond. siklop, 60 % beton campuran 1PC : 2 PB : 3


Kr dan 40% batu belah

Semen PC 194.000 Kg 1,333.47 258,693.91


Pasir Pasang / Beton 0.312 M³ 240,600.00 75,067.20
Batu Belah Uk. 15 - 20 0.490 M³ 296,200.00 145,138.00
Batu Belah / Batu Kali / Batu Gunung 0.468 M³ 294,800.00 137,966.40
Besi beton polos 126.000 Kg 11,700.00 1,474,200.00
Kawat Beton / Bendrat 0.800 Kg 23,100.00 18,480.00

Pekerja 3.000 Hari / Org 100,000.00 300,000.00


Tukang batu 0.850 Hari / Org 125,000.00 106,250.00
Kepala Tukang 0.085 Hari / Org 150,000.00 12,750.00
Mandor 0.150 Hari / Org 120,000.00 18,000.00
2,546,545.51
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 2,546,545.51

12 1 m³ Pasang pondasi sumuran diameter 100 cm

Batu Belah Uk. 15 - 20 0.450 M³ 296,200.00 133,290.00


Semen PC 194.000 Kg 1,333.47 258,693.91
Pasir Pasang / Beton 0.312 M³ 240,600.00 75,067.20
Kerikil Beton 0.468 M³ 333,100.00 155,890.80

Pekerja 2.400 Hari / Org 100,000.00 240,000.00


Tukang batu 0.800 Hari / Org 125,000.00 100,000.00
Kepala Tukang 0.080 Hari / Org 150,000.00 12,000.00
Mandor 0.119 Hari / Org 120,000.00 14,280.00
989,221.91
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 989,221.91

13 1 m¹
Pembuatan tiang pancang (40 x 40) cm, beton bertulang

Pasir Kasar/ Urug 0.019 M³ 52,000.00 988.00


Pasir Pasang / Beton 0.094 M³ 240,600.00 22,616.40
Kerikil Beton 0.150 M³ 333,100.00 49,965.00
Semen PC 60.500 Kg 1,333.47 80,675.16
Besi beton polos 45.000 Kg 11,700.00 526,500.00
Kawat Beton / Bendrat 0.900 Kg 23,100.00 20,790.00
Kayu Kelas III (Kayu Nantu, dll.) 0.032 M³ 3,500,000.00 112,000.00
Paku Kayu 2" s/d 6" 0.120 Kg 18,000.00 2,160.00
Minyak bekisting 0.090 Ltr 10,500.00 945.00
Plamur Tembok (Danapaint Setara) 0.240 Kg 18,000.00 4,320.00

Pekerja 1.000 Hari / Org 100,000.00 100,000.00


Tukang batu 0.670 Hari / Org 125,000.00 83,750.00
Kepala Tukang 0.067 Hari / Org 150,000.00 10,050.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
1,020,759.56
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 1,020,759.56

14 1 m¹
Pembuatan tiang pancang (35 x 35) cm, beton bertulang

Pasir Kasar/ Urug 0.016 M³ 52,000.00 832.00


Pasir Pasang / Beton 0.080 M³ 240,600.00 19,248.00
Kerikil Beton 0.125 M³ 333,100.00 41,637.50
Semen PC 49.000 Kg 1,333.47 65,340.21
Besi beton polos 34.500 Kg 11,700.00 403,650.00

Harga Satuan Dinas PU Manado 2017 Halaman 64 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Kawat Beton / Bendrat 0.700 Kg 23,100.00 16,170.00


Kayu Kelas III (Kayu Nantu, dll.) 0.027 M³ 3,500,000.00 94,500.00
Paku Kayu 2" s/d 6" 0.120 Kg 18,000.00 2,160.00
Minyak bekisting 0.090 Ltr 10,500.00 945.00
Plamur Tembok (Danapaint Setara) 0.200 Kg 18,000.00 3,600.00

Pekerja 0.800 Hari / Org 100,000.00 80,000.00


Tukang batu 0.500 Hari / Org 125,000.00 62,500.00
Kepala Tukang 0.050 Hari / Org 150,000.00 7,500.00
Mandor 0.040 Hari / Org 120,000.00 4,800.00
802,882.71
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 802,882.71

IV. PEKERJAAN DINDING SNI 6897:2008

1 1 m² Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps

Bata merah 140.000 Bh 850.00 119,000.00


Semen PC 43.500 Kg 1,333.47 58,006.11
Pasir Pasang / Beton 0.080 M³ 240,600.00 19,248.00

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 2.000 Hari / Org 125,000.00 250,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
512,854.11
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 512,854.11

2 1 m² Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps

Bata merah 140.000 Bh 850.00 119,000.00


Semen PC 32.950 Kg 1,333.47 43,937.96
Pasir Pasang / Beton 0.091 M³ 240,600.00 21,894.60

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 2.000 Hari / Org 125,000.00 250,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
501,432.56
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 501,432.56

3 1 m² Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps

Bata merah 140.000 Bh 850.00 119,000.00


Semen PC 26.550 Kg 1,333.47 35,403.73
Pasir Pasang / Beton 0.093 M³ 240,600.00 22,375.80

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
268,379.53
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 268,379.53

4 1 m² Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps

Bata merah 140.000 Bh 850.00 119,000.00


Semen PC 22.200 Kg 1,333.47 29,603.12
Pasir Pasang / Beton 0.102 M³ 240,600.00 24,541.20

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
264,744.32
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 264,744.32

5 1 m² Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps

Bata merah 140.000 Bh 850.00 119,000.00


Semen PC 18.500 Kg 1,333.47 24,669.26
Pasir Pasang / Beton 0.102 M³ 240,600.00 24,589.32

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
259,858.58
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 259,858.58

6 1 m² Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps

Bata merah 140.000 Bh 850.00 119,000.00

Harga Satuan Dinas PU Manado 2017 Halaman 65 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Semen PC 10.080 Kg 1,333.47 13,441.42


Pasir Pasang / Beton 0.093 M³ 240,600.00 22,255.50
Kapur 0.028 M3 245,460.00 6,750.15

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
253,047.07
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 253,047.07

7 1 m² Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps

Bata merah 70.000 Bh 850.00 59,500.00


Semen PC 18.950 Kg 1,333.47 25,269.33
Pasir Pasang / Beton 0.038 M³ 240,600.00 9,142.80

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
139,712.13
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 139,712.13

8 1 m² Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps

Bata merah 70.000 Bh 850.00 59,500.00


Semen PC 14.370 Kg 1,333.47 19,162.02
Pasir Pasang / Beton 0.040 M³ 240,600.00 9,624.00

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
134,086.02
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 134,086.02

9 1 m² Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps

Bata merah 70.000 Bh 850.00 59,500.00


Semen PC 11.500 Kg 1,333.47 15,334.95
Pasir Pasang / Beton 0.043 M³ 240,600.00 10,345.80

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
130,980.75
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 130,980.75

10 1 m² Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps

Bata merah 70.000 Bh 850.00 59,500.00


Semen PC 9.680 Kg 1,333.47 12,908.03
Pasir Pasang / Beton 0.045 M³ 240,600.00 10,827.00

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
129,035.03
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 129,035.03

11 1 m² Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps

Bata merah 70.000 Bh 850.00 59,500.00


Semen PC 8.320 Kg 1,333.47 11,094.50
Pasir Pasang / Beton 0.049 M³ 240,600.00 11,789.40

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
128,183.90
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 128,183.90

12 1 m² Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps

Bata merah 70.000 Bh 850.00 59,500.00


Semen PC 6.500 Kg 1,333.47 8,667.58
Pasir Pasang / Beton 0.050 M³ 240,600.00 12,030.00

Harga Satuan Dinas PU Manado 2017 Halaman 66 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
125,997.58
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 125,997.58

13 1 m² Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

Bata merah 70.000 Bh 850.00 59,500.00


Semen PC 4.500 Kg 1,333.47 6,000.63
Pasir Pasang / Beton 0.050 M³ 240,600.00 12,030.00
Kapur padam 0.015 M³ 245,460.00 3,681.90

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
127,012.53
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 127,012.53

14 1 m² Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps

Bata merah 70.000 Bh 850.00 59,500.00


Semen warna 0.018 Kg 12,000.00 216.00
Pasir Pasang / Beton 0.018 M³ 240,600.00 4,330.80
Kapur padam 0.018 M³ 245,460.00 4,418.28

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
114,265.08
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 114,265.08

15 1 m² Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps

Bata merah 70.000 Bh 850.00 59,500.00


Semen warna 0.014 Kg 12,000.00 168.00
Pasir Pasang / Beton 0.028 M³ 240,600.00 6,736.80
Kapur padam 0.014 M³ 245,460.00 3,436.44

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
115,641.24
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 115,641.24

V. PEKERJAAN PLESTERAN SNI 2837:2008

1 1 m² Plesteran 1 Pc : 1 Ps, tebal 15 mm

Semen PC 15.504 Kg 1,333.47 20,674.18


Pasir Pasang / Beton 0.016 M³ 240,600.00 3,849.60

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
77,323.78
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 77,323.78

2 1 m² Plesteran 1 Pc : 2 Ps, tebal 15 mm

Semen PC 10.224 Kg 1,333.47 13,633.44


Pasir Pasang / Beton 0.020 M³ 240,600.00 4,812.00

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
71,245.44
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 71,245.44

3 1 m² Plesteran 1 Pc : 3 Ps, tebal 15 mm

Semen PC 7.776 Kg 1,333.47 10,369.09


Pasir Pasang / Beton 0.023 M³ 240,600.00 5,533.80

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00

Harga Satuan Dinas PU Manado 2017 Halaman 67 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

68,702.89
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 68,702.89

4 1 m² Plesteran 1 Pc : 4 Ps, tebal 15 mm

Semen PC 6.240 Kg 1,333.47 8,320.88


Pasir Pasang / Beton 0.024 M³ 240,600.00 5,774.40

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
66,895.28
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 66,895.28

5 1 m² Plesteran 1 Pc : 5 Ps, tebal 15 mm

Semen PC 5.184 Kg 1,333.47 6,912.73


Pasir Pasang / Beton 0.026 M³ 240,600.00 6,255.60

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
65,968.33
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 65,968.33

6 1 m² Plesteran 1 Pc : 6 Ps, tebal 15 mm

Semen PC 4.416 Kg 1,333.47 5,888.62


Pasir Pasang / Beton 0.027 M³ 240,600.00 6,496.20

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
65,184.82
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 65,184.82

7 1 m² Plesteran 1 Pc : 2 Ps ; tebal 20 mm

Semen PC 13.632 Kg 1,333.47 18,177.91


Pasir Pasang / Beton 0.027 M³ 240,600.00 6,496.20

Pekerja 0.400 Hari / Org 100,000.00 40,000.00


Tukang batu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.022 Hari / Org 120,000.00 2,640.00
95,314.11
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 95,314.11

8 1 m² Plesteran 1 Pc : 3 Ps ; tebal 20 mm

Semen PC 10.368 Kg 1,333.47 13,825.46


Pasir Pasang / Beton 0.031 M³ 240,600.00 7,458.60

Pekerja 0.400 Hari / Org 100,000.00 40,000.00


Tukang batu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.013 Hari / Org 120,000.00 1,560.00
90,844.06
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 90,844.06

9 1 m² Plesteran 1 Pc : 4 Ps ; tebal 20 mm

Semen PC 8.320 Kg 1,333.47 11,094.50


Pasir Pasang / Beton 0.032 M³ 240,600.00 7,699.20

Pekerja 0.400 Hari / Org 100,000.00 40,000.00


Tukang batu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.022 Hari / Org 120,000.00 2,640.00
89,433.70
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 89,433.70

10 1 m² Plesteran 1 Pc : 5 Ps ; tebal 20 mm

Semen PC 6.912 Kg 1,333.47 9,216.97

Harga Satuan Dinas PU Manado 2017 Halaman 68 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pasir Pasang / Beton 0.035 M³ 240,600.00 8,421.00

Pekerja 0.400 Hari / Org 100,000.00 40,000.00


Tukang batu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.022 Hari / Org 120,000.00 2,640.00
88,277.97
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 88,277.97

11 1 m² Plesteran Skoning 1 PC : 2 PP, lebar 10 mm

Semen PC 0.500 Kg 1,333.47 666.74


Pasir Pasang / Beton 0.013 M³ 240,600.00 3,127.80

Pekerja 0.080 Hari / Org 100,000.00 8,000.00


Tukang batu 0.400 Hari / Org 125,000.00 50,000.00
Kepala Tukang 0.040 Hari / Org 150,000.00 6,000.00
Mandor 0.004 Hari / Org 120,000.00 480.00
68,274.54
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 68,274.54

12 1 m² Plesteran siar timbul adukan 1 Pc : 2 Ps

Semen PC 6.340 Kg 1,333.47 8,454.22


Pasir Pasang / Beton 0.012 M³ 240,600.00 2,887.20

Pekerja 0.300 Hari / Org 100,000.00 30,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
64,141.42
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 64,141.42

13 1 m² Acian

Semen PC 3.250 Kg 1,333.47 4,333.79

Pekerja 0.200 Hari / Org 100,000.00 20,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.010 Hari / Org 120,000.00 1,200.00
39,533.79
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 39,533.79

14 1 m² Acian Untuk Saluran

Semen PC 1.500 Kg 1,333.47 2,000.21

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang batu 0.050 Hari / Org 125,000.00 6,250.00
Kepala Tukang 0.008 Hari / Org 150,000.00 1,200.00
Mandor 0.008 Hari / Org 120,000.00 960.00
20,410.21
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 20,410.21

V. PEKERJAAN PINTU DAN JENDELA SNI 3434:2008

1 1 m³ Membuat dan memasang kosen pintu, jendela, ventilasi,


kayu Kls.I

Kayu Kelas I (Kayu Besi, dll.) 1.100 M³ 8,500,000.00 9,350,000.00


Paku Kayu 2" s/d 6" 1.250 Kg 18,000.00 22,500.00
Lem kayu 1.000 Kg 35,000.00 35,000.00

Pekerja 7.000 Hari / Org 100,000.00 700,000.00


Tukang kayu 21.000 Hari / Org 125,000.00 2,625,000.00
Kepala Tukang 2.100 Hari / Org 150,000.00 315,000.00
Mandor 0.350 Hari / Org 120,000.00 42,000.00
13,089,500.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 13,089,500.00

2 1 m³ Membuat dan memasang kosen pintu, jendela, ventilasi,


kayu Kls.II

Kayu Kelas II (Kayu Cempaka, dll.) 1.200 M³ 5,000,000.00 6,000,000.00


Paku Kayu 2" s/d 6" 1.250 Kg 18,000.00 22,500.00
Lem kayu 1.000 Kg 35,000.00 35,000.00

Pekerja 6.000 Hari / Org 100,000.00 600,000.00

Harga Satuan Dinas PU Manado 2017 Halaman 69 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Tukang kayu 18.000 Hari / Org 125,000.00 2,250,000.00


Kepala Tukang 1.800 Hari / Org 150,000.00 270,000.00
Mandor 0.300 Hari / Org 120,000.00 36,000.00
9,213,500.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 9,213,500.00

3 1 m² Mermbuat dan memasang Pintu klamp standar, rangka


kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.040 M³ 5,000,000.00 200,000.00


Paku Kayu 2" s/d 6" 0.050 Kg 18,000.00 900.00

Pekerja 0.350 Hari / Org 100,000.00 35,000.00


Tukang kayu 1.050 Hari / Org 125,000.00 131,250.00
Kepala Tukang 0.105 Hari / Org 150,000.00 15,750.00
Mandor 0.018 Hari / Org 120,000.00 2,160.00
385,060.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 385,060.00

4 1 m² Mermbuat dan memasang Pintu klamp sederhana, rangka


kayu kelas III

Kayu Kelas III (Kayu Nantu, dll.) 0.040 M³ 3,500,000.00 140,000.00


Paku Kayu 2" s/d 6" 0.050 Kg 18,000.00 900.00

Pekerja 0.350 Hari / Org 100,000.00 35,000.00


Tukang kayu 1.050 Hari / Org 125,000.00 131,250.00
Kepala Tukang 0.105 Hari / Org 150,000.00 15,750.00
Mandor 0.018 Hari / Org 120,000.00 2,160.00
325,060.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 325,060.00

5 1 m² Membuat dan memasang pintu panel kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.040 M³ 8,500,000.00 340,000.00


Lem kayu 0.500 Kg 35,000.00 17,500.00

Pekerja 1.000 Hari / Org 100,000.00 100,000.00


Tukang kayu 3.000 Hari / Org 125,000.00 375,000.00
Kepala Tukang 0.300 Hari / Org 150,000.00 45,000.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
883,500.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 883,500.00

6 1 m² Membuat dan memasang pintu panel kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.040 M³ 5,000,000.00 200,000.00


Lem kayu 0.500 Kg 35,000.00 17,500.00

Pekerja 1.000 Hari / Org 100,000.00 100,000.00


Tukang kayu 3.000 Hari / Org 125,000.00 375,000.00
Kepala Tukang 0.300 Hari / Org 150,000.00 45,000.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
743,500.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 743,500.00

7 1 m² Membuat dan memasang pintu dan jendela kaca kayu


kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.024 M³ 8,500,000.00 204,000.00


Lem kayu 0.300 Kg 35,000.00 10,500.00

Pekerja 0.800 Hari / Org 100,000.00 80,000.00


Tukang kayu 2.400 Hari / Org 125,000.00 300,000.00
Kepala Tukang 0.240 Hari / Org 150,000.00 36,000.00
Mandor 0.040 Hari / Org 120,000.00 4,800.00
635,300.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 635,300.00

8 1 m² Membuat dan memasang pintu dan jendela kaca kayu


kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.024 M³ 5,000,000.00 120,000.00


Lem kayu 0.300 Kg 35,000.00 10,500.00

Pekerja 0.800 Hari / Org 100,000.00 80,000.00


Tukang kayu 2.400 Hari / Org 125,000.00 300,000.00
Kepala Tukang 0.240 Hari / Org 150,000.00 36,000.00
Mandor 0.040 Hari / Org 120,000.00 4,800.00
551,300.00
Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2017 Halaman 70 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Biaya Untuk 1 M2 551,300.00

9 1 m² Membuat dan memasang pintu dan jendela jalusi kayu


kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.064 M³ 8,500,000.00 544,000.00


Lem kayu 0.500 Kg 35,000.00 17,500.00

Pekerja 1.000 Hari / Org 100,000.00 100,000.00


Tukang kayu 3.000 Hari / Org 125,000.00 375,000.00
Kepala Tukang 0.300 Hari / Org 150,000.00 45,000.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
1,087,500.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 1,087,500.00

10 1 m² Membuat dan memasang pintu dan jendela jalusi kayu


kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.064 M³ 5,000,000.00 320,000.00


Lem kayu 0.500 Kg 35,000.00 17,500.00

Pekerja 1.000 Hari / Org 100,000.00 100,000.00


Tukang kayu 3.000 Hari / Org 125,000.00 375,000.00
Kepala Tukang 0.300 Hari / Org 150,000.00 45,000.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
863,500.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 863,500.00

11 1 m² Pasang pintu plywood rangkap,rangka kayu kelas I (lebar


sampai 90 cm)

Kayu Kelas I (Kayu Besi, dll.) 0.025 M³ 8,500,000.00 212,500.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00
Lem kayu 0.500 Kg 35,000.00 17,500.00
Plywood 4 mm 1.000 Lbr 85,000.00 85,000.00

Pekerja 0.700 Hari / Org 100,000.00 70,000.00


Tukang kayu 2.100 Hari / Org 125,000.00 262,500.00
Kepala Tukang 0.210 Hari / Org 150,000.00 31,500.00
Mandor 0.035 Hari / Org 120,000.00 4,200.00
683,740.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 683,740.00

12 1 m² Memasang jalusi kusen, kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.060 M³ 8,500,000.00 510,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.670 Hari / Org 100,000.00 67,000.00


Tukang kayu 2.000 Hari / Org 125,000.00 250,000.00
Kepala Tukang 0.200 Hari / Org 150,000.00 30,000.00
Mandor 0.335 Hari / Org 120,000.00 40,200.00
899,900.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 899,900.00

13 1 m² Memasang jalusi kusen, kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.060 M³ 5,000,000.00 300,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.670 Hari / Org 100,000.00 67,000.00


Tukang kayu 2.000 Hari / Org 125,000.00 250,000.00
Kepala Tukang 0.200 Hari / Org 150,000.00 30,000.00
Mandor 0.335 Hari / Org 120,000.00 40,200.00
689,900.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 689,900.00

14 1 m² Pasang pintu plywood rangkap, rangka kayu kelas II (lebar


sampai 90 cm)

Kayu Kelas II (Kayu Cempaka, dll.) 0.025 M³ 5,000,000.00 125,000.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00
Lem kayu 0.500 Kg 35,000.00 17,500.00
Plywood 4 mm 1.000 Lbr 85,000.00 85,000.00

Pekerja 0.700 Hari / Org 100,000.00 70,000.00


Tukang kayu 2.100 Hari / Org 125,000.00 262,500.00
Kepala Tukang 0.210 Hari / Org 150,000.00 31,500.00
Mandor 0.035 Hari / Org 120,000.00 4,200.00
596,240.00

Harga Satuan Dinas PU Manado 2017 Halaman 71 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 596,240.00

15 1 m² Pasang pintu plywood rangkap, rangka expose kayu kelas


I

Kayu Kelas I (Kayu Besi, dll.) 0.025 M³ 8,500,000.00 212,500.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00
Lem kayu 0.100 Kg 35,000.00 3,500.00
Plywood 4 mm 1.000 Lbr 85,000.00 85,000.00

Pekerja 0.800 Hari / Org 100,000.00 80,000.00


Tukang kayu 2.400 Hari / Org 125,000.00 300,000.00
Kepala Tukang 0.240 Hari / Org 150,000.00 36,000.00
Mandor 0.040 Hari / Org 120,000.00 4,800.00
722,340.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 722,340.00

16 1 m² Pasang pintu plywood rangkap, rangka expose kayu kelas


II

Kayu Kelas II (Kayu Cempaka, dll.) 0.026 M³ 5,000,000.00 128,000.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00
Lem kayu 0.500 Kg 35,000.00 17,500.00
Plywood 4 mm 1.000 Lbr 85,000.00 85,000.00

Pekerja 0.800 Hari / Org 100,000.00 80,000.00


Tukang kayu 2.400 Hari / Org 125,000.00 300,000.00
Kepala Tukang 0.240 Hari / Org 150,000.00 36,000.00
Mandor 0.040 Hari / Org 120,000.00 4,800.00
651,840.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 651,840.00

17 1 m² Pasang pintu teakwood rangkap, rangka kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.025 M³ 8,500,000.00 212,500.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00
Lem kayu 0.500 Kg 35,000.00 17,500.00
Teakwood 4x8 1.000 Lbr 180,000.00 180,000.00

Pekerja 0.700 Hari / Org 100,000.00 70,000.00


Tukang kayu 2.100 Hari / Org 125,000.00 262,500.00
Kepala Tukang 0.210 Hari / Org 150,000.00 31,500.00
Mandor 0.035 Hari / Org 120,000.00 4,200.00
778,740.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 778,740.00

18 1 m² Pasang pintu teakwood rangkap, rangka kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.025 M³ 5,000,000.00 125,000.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00
Lem kayu 0.500 Kg 35,000.00 17,500.00
Teakwood 4x8 1.000 Lbr 180,000.00 180,000.00

Pekerja 0.700 Hari / Org 100,000.00 70,000.00


Tukang kayu 2.100 Hari / Org 125,000.00 262,500.00
Kepala Tukang 0.210 Hari / Org 150,000.00 31,500.00
Mandor 0.035 Hari / Org 120,000.00 4,200.00
691,240.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 691,240.00

19 1 m² Pasang pintu teakwood rangkap, rangka expose kayu


kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.025 M³ 8,500,000.00 212,500.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00
Lem kayu 0.300 Kg 35,000.00 10,500.00
Teakwood 4x8 1.000 Lbr 180,000.00 180,000.00

Pekerja 0.800 Hari / Org 100,000.00 80,000.00


Tukang kayu 2.400 Hari / Org 125,000.00 300,000.00
Kepala Tukang 0.240 Hari / Org 150,000.00 36,000.00
Mandor 0.040 Hari / Org 120,000.00 4,800.00
824,340.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 824,340.00

20 1 m² Pasang pintu teakwood rangkap, rangka expose kayu


kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.025 M³ 5,000,000.00 125,000.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00
Lem kayu 0.300 Kg 35,000.00 10,500.00

Harga Satuan Dinas PU Manado 2017 Halaman 72 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Teakwood 4x8 1.000 Lbr 180,000.00 180,000.00

Pekerja 0.800 Hari / Org 100,000.00 80,000.00


Tukang kayu 2.400 Hari / Org 125,000.00 300,000.00
Kepala Tukang 0.240 Hari / Org 150,000.00 36,000.00
Mandor 0.040 Hari / Org 120,000.00 4,800.00
736,840.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 736,840.00

21 1 m² Pasang pintu teakwood rangkap & formika rangka expose


kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.025 M³ 8,500,000.00 212,500.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00
Lem kayu 0.800 Kg 35,000.00 28,000.00
Teakwood 4x8 1.000 Lbr 180,000.00 180,000.00
Formica 0.500 Lbr 70,000.00 35,000.00

Pekerja 0.800 Hari / Org 100,000.00 80,000.00


Tukang kayu 2.400 Hari / Org 125,000.00 300,000.00
Kepala Tukang 0.240 Hari / Org 150,000.00 36,000.00
Mandor 0.040 Hari / Org 120,000.00 4,800.00
876,840.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 876,840.00

22 1 m² Pasang pintu teakwood rangkap & formika rangka expose


kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.025 M³ 5,000,000.00 125,000.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00
Lem kayu 0.800 Kg 35,000.00 28,000.00
Teakwood 4x8 1.000 Lbr 180,000.00 180,000.00
Formica 0.500 Lbr 70,000.00 35,000.00

Pekerja 0.800 Hari / Org 100,000.00 80,000.00


Tukang kayu 2.400 Hari / Org 125,000.00 300,000.00
Kepala Tukang 0.240 Hari / Org 150,000.00 36,000.00
Mandor 0.040 Hari / Org 120,000.00 4,800.00
789,340.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 789,340.00

23 1 m³ Pasang konstruksi kuda-kuda kayu jati

Kayu Kelas I (Kayu Besi, dll.) 1.100 M³ 8,500,000.00 9,350,000.00


Besi strip 15.000 Kg 88,000.00 1,320,000.00
Paku Kayu 2" s/d 6" 5.600 Kg 18,000.00 100,800.00

Pekerja 4.000 Hari / Org 100,000.00 400,000.00


Tukang kayu 12.000 Hari / Org 125,000.00 1,500,000.00
Kepala Tukang 1.200 Hari / Org 150,000.00 180,000.00
Mandor 0.200 Hari / Org 120,000.00 24,000.00
12,874,800.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 12,874,800.00

24 1 m³ Pasang konstruksi kuda-kuda kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 1.100 M³ 8,500,000.00 9,350,000.00


Besi strip 15.000 Kg 88,000.00 1,320,000.00
Paku Kayu 2" s/d 6" 5.600 Kg 18,000.00 100,800.00

Pekerja 4.000 Hari / Org 100,000.00 400,000.00


Tukang kayu 12.000 Hari / Org 125,000.00 1,500,000.00
Kepala Tukang 1.200 Hari / Org 150,000.00 180,000.00
Mandor 0.200 Hari / Org 120,000.00 24,000.00
12,874,800.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 12,874,800.00

25 1 m³ Pasang konstruksi kuda-kuda kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 1.100 M³ 5,000,000.00 5,500,000.00


Besi strip 15.000 Kg 88,000.00 1,320,000.00
Paku Kayu 2" s/d 6" 5.600 Kg 18,000.00 100,800.00

Pekerja 4.000 Hari / Org 100,000.00 400,000.00


Tukang kayu 12.000 Hari / Org 125,000.00 1,500,000.00
Kepala Tukang 1.200 Hari / Org 150,000.00 180,000.00
Mandor 0.200 Hari / Org 120,000.00 24,000.00
9,024,800.00
Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2017 Halaman 73 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Biaya Untuk 1 M3 9,024,800.00

26 1 m³ Pasang konstruksi kuda-kuda kayu kelas III

Kayu Kelas III (Kayu Nantu, dll.) 1.100 M³ 3,500,000.00 3,850,000.00


Besi strip 15.000 Kg 88,000.00 1,320,000.00
Paku Kayu 2" s/d 6" 5.600 Kg 18,000.00 100,800.00

Pekerja 4.000 Hari / Org 100,000.00 400,000.00


Tukang kayu 12.000 Hari / Org 125,000.00 1,500,000.00
Kepala Tukang 1.200 Hari / Org 150,000.00 180,000.00
Mandor 0.200 Hari / Org 120,000.00 24,000.00
7,374,800.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 7,374,800.00

27 1 m² Pasang kaso + reng genteng kodok kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.012 M³ 8,500,000.00 102,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.005 Hari / Org 120,000.00 600.00
129,300.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 129,300.00

28 1 m² Pasang kaso + reng genteng kodok kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.012 M³ 5,000,000.00 60,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.005 Hari / Org 120,000.00 600.00
87,300.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 87,300.00

29 1 m² Pasang kaso + reng genteng monier kayu jati

Kayu Kelas I (Kayu Besi, dll.) 0.014 M³ 8,500,000.00 119,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.005 Hari / Org 120,000.00 600.00
146,300.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 146,300.00

30 1 m² Pasang kaso + reng genteng monier kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.014 M³ 8,500,000.00 119,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.005 Hari / Org 120,000.00 600.00
146,300.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 146,300.00

31 1 m² Pasang kaso + reng genteng beton kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.014 M³ 5,000,000.00 70,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.005 Hari / Org 120,000.00 600.00
97,300.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 97,300.00

32 1 m² Pasang kaso + reng atap sirap kayu kelas I

Harga Satuan Dinas PU Manado 2017 Halaman 74 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Kayu Kelas I (Kayu Besi, dll.) 0.165 M³ 8,500,000.00 1,402,500.00


Paku Kayu 2" s/d 6" 0.200 Kg 18,000.00 3,600.00

Pekerja 0.120 Hari / Org 100,000.00 12,000.00


Tukang kayu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.006 Hari / Org 120,000.00 720.00
1,435,620.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 1,435,620.00

33 1 m² Pasang kaso + reng atap sirap kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.165 M³ 5,000,000.00 825,000.00


Paku Kayu 2" s/d 6" 0.200 Kg 18,000.00 3,600.00

Pekerja 0.120 Hari / Org 100,000.00 12,000.00


Tukang kayu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.006 Hari / Org 120,000.00 720.00
858,120.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 858,120.00

34 1 m² Pasang rangka langit-langit (1,00 x 1,00) m, kayu jati

Kayu Kelas I (Kayu Besi, dll.) 0.012 M³ 8,500,000.00 102,000.00


Paku Kayu 2" s/d 6" 0.100 Kg 18,000.00 1,800.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
162,800.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 162,800.00

35 1 m² Pasang rangka langit-langit (1,00 x 1,00) m, kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.012 M³ 8,500,000.00 102,000.00


Paku Kayu 2" s/d 6" 0.100 Kg 18,000.00 1,800.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
162,800.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 162,800.00

36 1 m² Pasang rangka langit-langit (1,00 x 1,00) m, kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.012 M³ 5,000,000.00 60,000.00


Paku Kayu 2" s/d 6" 0.100 Kg 18,000.00 1,800.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
120,800.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 120,800.00

37 1 m² Pasang rangka langit-langit (30 x 60) cm, kayu jati

Kayu Kelas I (Kayu Besi, dll.) 0.023 M³ 8,500,000.00 195,500.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.200 Hari / Org 100,000.00 20,000.00


Tukang kayu 0.300 Hari / Org 125,000.00 37,500.00
Kepala Tukang 0.030 Hari / Org 150,000.00 4,500.00
Mandor 0.010 Hari / Org 120,000.00 1,200.00
261,400.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 261,400.00

38 1 m² Pasang Rangka langit-langit 50 x 100 cm, kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.015 M³ 5,000,000.00 77,000.00


Paku Kayu 2" s/d 6" 0.200 Kg 18,000.00 3,600.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00

Harga Satuan Dinas PU Manado 2017 Halaman 75 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Tukang kayu 0.300 Hari / Org 125,000.00 37,500.00


Kepala Tukang 0.030 Hari / Org 150,000.00 4,500.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
146,600.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 146,600.00

39 1 m² Pasang Rangka langit-langit 50 x 100 cm, kayu kelas III

Kayu Kelas III (Kayu Nantu, dll.) 0.015 M³ 3,500,000.00 53,900.00


Paku Kayu 2" s/d 6" 0.200 Kg 18,000.00 3,600.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.300 Hari / Org 125,000.00 37,500.00
Kepala Tukang 0.030 Hari / Org 150,000.00 4,500.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
123,500.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 123,500.00

40 1 m² Pasang Rangka plafon 60 x 60 cm, kayu kls II

Kayu Kelas II (Kayu Cempaka, dll.) 0.016 M³ 5,000,000.00 81,500.00


Paku Kayu 2" s/d 6" 0.250 Kg 18,000.00 4,500.00

Pekerja 0.200 Hari / Org 100,000.00 20,000.00


Tukang kayu 0.300 Hari / Org 125,000.00 37,500.00
Kepala Tukang 0.030 Hari / Org 150,000.00 4,500.00
Mandor 0.010 Hari / Org 120,000.00 1,200.00
149,200.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 149,200.00

41 1 m² Pasang Rangka plafon 60 x 60 cm, kayu kls III

Kayu Kelas III (Kayu Nantu, dll.) 0.016 M³ 3,500,000.00 57,050.00


Paku Kayu 2" s/d 6" 0.250 Kg 18,000.00 4,500.00

Pekerja 0.200 Hari / Org 100,000.00 20,000.00


Tukang kayu 0.300 Hari / Org 125,000.00 37,500.00
Kepala Tukang 0.030 Hari / Org 150,000.00 4,500.00
Mandor 0.010 Hari / Org 120,000.00 1,200.00
124,750.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 124,750.00

42 1 m² Pasang rangka langit-langit (30 x 30) cm, kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.027 M³ 5,000,000.00 135,000.00


Paku Kayu 2" s/d 6" 0.200 Kg 18,000.00 3,600.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang kayu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.013 Hari / Org 120,000.00 1,500.00
214,100.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 214,100.00

43 1 m¹ Pasang lisplang ukuran (3 x 20) cm, kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.011 M³ 8,500,000.00 91,800.00


Paku Kayu 2" s/d 6" 0.100 Kg 18,000.00 1,800.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.005 Hari / Org 120,000.00 600.00
132,200.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 132,200.00

44 1 m¹ Pasang lisplang ukuran (3 x 20) cm, kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.011 M³ 5,000,000.00 54,000.00


Paku Kayu 2" s/d 6" 0.100 Kg 18,000.00 1,800.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.005 Hari / Org 120,000.00 600.00
94,400.00
Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2017 Halaman 76 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Biaya Untuk 1 M' 94,400.00

45 1 m¹ Pasang lisplang ukuran (3 x 30) cm, kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.011 M³ 8,500,000.00 93,500.00


Paku Kayu 2" s/d 6" 0.050 Kg 18,000.00 900.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.005 Hari / Org 120,000.00 600.00
133,000.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 133,000.00

46 1 m¹ Pasang lisplang ukuran (3 x 30) cm, kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.011 M³ 5,000,000.00 55,000.00


Paku Kayu 2" s/d 6" 0.050 Kg 18,000.00 900.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.005 Hari / Org 120,000.00 600.00
94,500.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 94,500.00

47 1 m¹ Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.015 M³ 8,500,000.00 123,250.00


Paku Kayu 2" s/d 6" 0.060 Kg 18,000.00 1,080.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
183,330.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 183,330.00

48 1 m¹ Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.009 M³ 8,500,000.00 73,100.00


Paku Kayu 2" s/d 6" 0.060 Kg 18,000.00 1,080.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
104,180.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 104,180.00

49 1 m¹ Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.009 M³ 5,000,000.00 44,000.00


Paku Kayu 2" s/d 6" 0.060 Kg 18,000.00 1,080.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.050 Hari / Org 120,000.00 6,000.00
75,080.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 75,080.00

50 1 m² Pasang Rangka dinding pemisah (60x120) cm kayu kls. I

Kayu Kelas I (Kayu Besi, dll.) 0.028 M³ 8,500,000.00 238,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.008 Hari / Org 120,000.00 960.00
319,660.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 319,660.00

51 1 m² Pasang Rangka dinding pemisah (60x120) cm kayu kls. II

Kayu Kelas II (Kayu Cempaka, dll.) 0.028 M³ 5,000,000.00 140,000.00

Harga Satuan Dinas PU Manado 2017 Halaman 77 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.008 Hari / Org 120,000.00 960.00
221,660.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 221,660.00

52 1 m² Pasang Rangka dinding pemisah (60x120) cm kayu kls. III

Kayu Kelas III (Kayu Nantu, dll.) 0.028 M³ 3,500,000.00 98,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.008 Hari / Org 120,000.00 960.00
179,660.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 179,660.00

53 1 m² Pasang dinding pemisah teakwood rangkap, rangka kayu


kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.028 M³ 8,500,000.00 238,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00
Teakwood 4x8 0.860 Lbr 180,000.00 154,800.00
Lem kayu 0.560 Kg 35,000.00 19,600.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
502,100.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 502,100.00

54 1 m² Pasang dinding pemisah teakwood rangkap, rangka kayu


kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.028 M³ 5,000,000.00 140,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00
Teakwood 4x8 0.860 Lbr 180,000.00 154,800.00
Lem kayu 0.560 Kg 35,000.00 19,600.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.075 Hari / Org 120,000.00 9,000.00
404,100.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 404,100.00

55 1 m² Pasang dinding pemisah plywood rangkap, rangka kayu


kelas I

Kayu Kelas I (Kayu Besi, dll.) 0.028 M³ 8,500,000.00 238,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00
Plywood 4 mm 0.860 Lbr 85,000.00 73,100.00
Lem kayu 0.560 Kg 35,000.00 19,600.00

Pekerja 0.200 Hari / Org 100,000.00 20,000.00


Tukang kayu 0.600 Hari / Org 125,000.00 75,000.00
Kepala Tukang 0.060 Hari / Org 150,000.00 9,000.00
Mandor 0.010 Hari / Org 120,000.00 1,200.00
438,600.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 438,600.00

56 1 m² Pasang dinding pemisah plywood rangkap, rangka kayu


kelas II

Kayu Kelas II (Kayu Cempaka, dll.) 0.028 M³ 5,000,000.00 140,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00
Plywood 4 mm 0.860 Lbr 85,000.00 73,100.00
Lem kayu 0.560 Kg 35,000.00 19,600.00

Pekerja 0.200 Hari / Org 100,000.00 20,000.00


Tukang kayu 0.600 Hari / Org 125,000.00 75,000.00
Kepala Tukang 0.060 Hari / Org 150,000.00 9,000.00
Mandor 0.010 Hari / Org 120,000.00 1,200.00
340,600.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 340,600.00

57 1 m² Pasang Dinding pemisah gypsum rangkap, rangka kayu


kls. II

Harga Satuan Dinas PU Manado 2017 Halaman 78 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Kayu Kelas II (Kayu Cempaka, dll.) 0.028 M³ 5,000,000.00 140,000.00


Paku Kayu 2" s/d 6" 0.150 Kg 18,000.00 2,700.00
Gypsum 9 mm 0.860 Lbr 60,000.00 51,600.00
Lem kayu 0.560 Kg 35,000.00 19,600.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.008 Hari / Org 120,000.00 960.00
292,860.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 292,860.00

58 1 m² Pasang Dinding lambrisering dari papan kayu kls. II

Kayu Kelas II (Kayu Cempaka, dll.) 0.007 M³ 5,000,000.00 35,000.00


Paku Kayu 2" s/d 6" 0.100 Kg 18,000.00 1,800.00
Paku sekrup 0.150 Kg 55,000.00 8,250.00

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang kayu 1.800 Hari / Org 125,000.00 225,000.00
Kepala Tukang 0.180 Hari / Org 150,000.00 27,000.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
360,650.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 360,650.00

59 1 m¹ Pasang list plafond kayu profil 3/8

Kayu Profil 3/8 1.050 Ujg 14,000.00 14,700.00

Pekerja 0.021 Hari / Org 100,000.00 2,100.00


Tukang kayu 0.021 Hari / Org 125,000.00 2,625.00
Kepala Tukang 0.002 Hari / Org 150,000.00 300.00
Mandor 0.001 Hari / Org 120,000.00 120.00
19,845.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 19,845.00

VI. PEKERJAAN BETON

1 1 m³ Beton mutu f'c = 7,4 Mpa (K 100), slump (12 +/ 2) cm, w/c
0,87

Semen PC 247.000 Kg 1,333.47 329,368.02


Pasir Pasang / Beton 0.621 M³ 240,600.00 149,343.86
Kerikil Beton 0.740 M³ 333,100.00 246,494.00
Air 215.000 Ltr 150.00 32,250.00

Pekerja 1.650 Hari / Org 100,000.00 165,000.00


Tukang batu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.080 Hari / Org 120,000.00 9,600.00
967,055.87
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 967,055.87

2 1 m³ Beton mutu f'c = 9,8 Mpa (K 125), slump (12 +/ 2) cm, w/c
0,78

Semen PC 276.000 Kg 1,333.47 368,038.76


Pasir Pasang / Beton 0.591 M³ 240,600.00 142,297.71
Kerikil Beton 0.750 M³ 333,100.00 249,701.63
Air 215.000 Ltr 150.00 32,250.00

Pekerja 1.650 Hari / Org 100,000.00 165,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Kepala Tukang 0.028 Hari / Org 150,000.00 4,200.00
Mandor 0.083 Hari / Org 120,000.00 9,960.00
1,005,823.10
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,005,823.10

3 1 m³ Beton mutu f'c = 12,2 Mpa (K 150), slump (12 +/ 2) cm,


w/c 0,72

Semen PC 299.000 Kg 1,333.47 398,708.65


Pasir Pasang / Beton 0.571 M³ 240,600.00 137,313.86
Kerikil Beton 0.753 M³ 333,100.00 250,935.33
Air 215.000 Ltr 150.00 32,250.00

Pekerja 1.650 Hari / Org 100,000.00 165,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Kepala Tukang 0.028 Hari / Org 150,000.00 4,200.00
Mandor 0.083 Hari / Org 120,000.00 9,960.00
1,032,742.84
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,032,742.84

Harga Satuan Dinas PU Manado 2017 Halaman 79 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

4 1 m³ Lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6)
cm, w/c = 0,87

Semen PC 230.000 Kg 1,333.47 306,698.96


Pasir Pasang / Beton 0.638 M³ 240,600.00 153,468.43
Kerikil Beton 0.761 M³ 333,100.00 253,402.74
Air 200.000 Ltr 150.00 30,000.00

Pekerja 1.200 Hari / Org 100,000.00 120,000.00


Tukang batu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.060 Hari / Org 120,000.00 7,200.00
898,770.13
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 898,770.13

5 1 m³ Beton mutu f'c = 14,5 Mpa (K 175), slump (12 +/ 2) cm,


w/c 0,66

Semen PC 326.000 Kg 1,333.47 434,712.44


Pasir Pasang / Beton 0.543 M³ 240,600.00 130,611.43
Kerikil Beton 0.762 M³ 333,100.00 253,896.22
Air 215.000 Ltr 150.00 32,250.00

Pekerja 1.650 Hari / Org 100,000.00 165,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Kepala Tukang 0.028 Hari / Org 150,000.00 4,200.00
Mandor 0.083 Hari / Org 120,000.00 9,960.00
1,065,005.09
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,065,005.09

6 1 m³ Beton mutu f'c = 16,9 Mpa (K 200), slump (12 +/ 2) cm,


w/c 0,61r

Semen PC 352.000 Kg 1,333.47 469,382.76


Pasir Pasang / Beton 0.522 M³ 240,600.00 125,627.57
Kerikil Beton 0.764 M³ 333,100.00 254,389.70
Air 215.000 Ltr 150.00 32,250.00

Pekerja 1.650 Hari / Org 100,000.00 165,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Kepala Tukang 0.028 Hari / Org 150,000.00 4,200.00
Mandor 0.083 Hari / Org 120,000.00 9,960.00
1,095,185.04
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,095,185.04

7 1 m³ Beton mutu f'c = 19,3 Mpa (K 225), slump (12 +/ 2) cm,


w/c 0,58

Semen PC 371.000 Kg 1,333.47 494,718.76


Pasir Pasang / Beton 0.499 M³ 240,600.00 119,956.29
Kerikil Beton 0.776 M³ 333,100.00 258,337.56
Air 215.000 Ltr 150.00 32,250.00

Pekerja 1.650 Hari / Org 100,000.00 165,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Kepala Tukang 0.028 Hari / Org 150,000.00 4,200.00
Mandor 0.083 Hari / Org 120,000.00 9,960.00
1,118,797.60
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,118,797.60

8 1 m³ Beton mutu f'c = 21,7 Mpa (K 250), slump (12 +/ 2) cm,


w/c 0,56

Semen PC 384.000 Kg 1,333.47 512,053.92


Pasir Pasang / Beton 0.494 M³ 240,600.00 118,925.14
Kerikil Beton 0.770 M³ 333,100.00 256,363.63
Air 215.000 Ltr 150.00 32,250.00

Pekerja 1.650 Hari / Org 100,000.00 165,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Kepala Tukang 0.028 Hari / Org 150,000.00 4,200.00
Mandor 0.083 Hari / Org 120,000.00 9,960.00
1,133,127.69
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,133,127.69

9 1 m³ Beton mutu f'c = 24 Mpa (K 275), slump (12 +/ 2) cm, w/c


0,53

Semen PC 406.000 Kg 1,333.47 541,390.34


Pasir Pasang / Beton 0.494 M³ 240,600.00 118,925.14
Kerikil Beton 0.770 M³ 333,100.00 256,363.63
Air 215.000 Ltr 150.00 32,250.00

Pekerja 1.650 Hari / Org 100,000.00 165,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00

Harga Satuan Dinas PU Manado 2017 Halaman 80 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Kepala Tukang 0.028 Hari / Org 150,000.00 4,200.00


Mandor 0.083 Hari / Org 120,000.00 9,960.00
1,162,464.11
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,162,464.11

10 1 m³ Beton mutu f'c = 26,4 Mpa (K 300), slump (12 +/ 2) cm,


w/c 0,52

Semen PC 413.000 Kg 1,333.47 550,724.66


Pasir Pasang / Beton 0.486 M³ 240,600.00 117,034.71
Kerikil Beton 0.756 M³ 333,100.00 251,922.30
Air 215.000 Ltr 150.00 32,250.00

Pekerja 1.650 Hari / Org 100,000.00 165,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Kepala Tukang 0.028 Hari / Org 150,000.00 4,200.00
Mandor 0.083 Hari / Org 120,000.00 9,960.00
1,165,466.67
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,165,466.67

11 1 m³ Beton mutu f'c = 28,8 Mpa (K 325), slump (12 +/ 2) cm,


w/c 0,49

Semen PC 439.000 Kg 1,333.47 585,394.98


Pasir Pasang / Beton 0.479 M³ 240,600.00 115,144.29
Kerikil Beton 0.745 M³ 333,100.00 248,221.19
Air 215.000 Ltr 150.00 32,250.00

Pekerja 2.100 Hari / Org 100,000.00 210,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.105 Hari / Org 120,000.00 12,600.00
1,252,610.45
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,252,610.45

12 1 m³ Beton mutu f'c = 31,2 Mpa (K 350), slump (12 +/ 2) cm,


w/c 0,48

Semen PC 448.000 Kg 1,333.47 597,396.24


Pasir Pasang / Beton 0.476 M³ 240,600.00 114,628.71
Kerikil Beton 0.741 M³ 333,100.00 246,740.74
Air 215.000 Ltr 150.00 32,250.00

Pekerja 2.100 Hari / Org 100,000.00 210,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.105 Hari / Org 120,000.00 12,600.00
1,262,615.70
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,262,615.70

13 1 m³ Beton kedap air dengan storox-100

Semen PC 367.000 Kg 1,333.47 489,384.87


Pasir Pasang / Beton 0.440 M³ 240,600.00 105,864.00
Kerikil Beton 0.880 M³ 333,100.00 293,128.00
Storox-100 1.200 Kg 50,000.00 60,900.00

Pekerja 2.100 Hari / Org 100,000.00 210,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.105 Hari / Org 120,000.00 12,600.00
1,220,876.87
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 1,220,876.87

14 1 Kg Pembesian dengan besi polos atau besi ulir

Besi Beton Polos 1.050 Kg 11,700.00 12,285.00


Kawat Beton / Bendrat 0.015 Kg 23,100.00 346.50

Pekerja 0.007 Hari / Org 100,000.00 700.00


Tukang batu 0.007 Hari / Org 125,000.00 875.00
Kepala tukang 0.001 Hari / Org 150,000.00 105.00
Mandor 0.000 Hari / Org 120,000.00 48.00
14,359.50
Over Head, Keuntungan, Dll

Biaya Untuk 1 Kg 14,359.50

15 1 m² Memasang jaring kawat/wiremesh θ 6

Besi Warmesh θ 6 0.088 Unit 375,000.00 33,000.00


Kawat Beton / Bendrat 0.005 Kg 23,100.00 115.50

Pekerja 0.500 Hari / Org 100,000.00 50,000.00


Tukang batu 0.500 Hari / Org 125,000.00 62,500.00

Harga Satuan Dinas PU Manado 2017 Halaman 81 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Kepala tukang 0.050 Hari / Org 150,000.00 7,500.00


Mandor 0.030 Hari / Org 120,000.00 3,600.00
156,715.50
Over Head, Keuntungan, Dll

Biaya Untuk 1 Kg 156,715.50

16 1 m² Memasang jaring kawat/wiremesh θ 8

Besi Warmesh θ 8 0.088 Unit 650,000.00 57,200.00


Kawat Beton / Bendrat 0.005 Kg 23,100.00 115.50

Pekerja 0.500 Hari / Org 100,000.00 50,000.00


Tukang batu 0.500 Hari / Org 125,000.00 62,500.00
Kepala tukang 0.050 Hari / Org 150,000.00 7,500.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
180,915.50
Over Head, Keuntungan, Dll

Biaya Untuk 1 Kg 180,915.50

17 1 m² Memasang jaring kawat/wiremesh θ 10

Besi Warmesh θ 10 0.088 Unit 1,000,000.00 88,000.00


Kawat Beton / Bendrat 0.005 Kg 23,100.00 115.50

Pekerja 0.500 Hari / Org 100,000.00 50,000.00


Tukang batu 0.500 Hari / Org 125,000.00 62,500.00
Kepala tukang 0.050 Hari / Org 150,000.00 7,500.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
211,715.50
Over Head, Keuntungan, Dll

Biaya Untuk 1 Kg 211,715.50

18 1 m² Pasang bekisting untuk pondasi

Kayu Kelas III (Kayu Nantu, dll.) 0.040 M³ 3,500,000.00 140,000.00


Paku Kayu 2" s/d 6" 0.300 Kg 18,000.00 5,400.00
Minyak bekisting 0.100 Ltr 10,500.00 1,050.00

Pekerja 0.520 Hari / Org 100,000.00 52,000.00


Tukang batu 0.260 Hari / Org 125,000.00 32,500.00
Kepala tukang 0.026 Hari / Org 150,000.00 3,900.00
Mandor 0.026 Hari / Org 120,000.00 3,120.00
237,970.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 237,970.00

19 1 m² Pasang bekisting untuk sloof

Kayu Kelas III (Kayu Nantu, dll.) 0.045 M³ 3,500,000.00 157,500.00


Paku Kayu 2" s/d 6" 0.300 Kg 18,000.00 5,400.00
Minyak bekisting 0.100 Ltr 10,500.00 1,050.00

Pekerja 0.520 Hari / Org 100,000.00 52,000.00


Tukang batu 0.260 Hari / Org 125,000.00 32,500.00
Kepala tukang 0.026 Hari / Org 150,000.00 3,900.00
Mandor 0.026 Hari / Org 120,000.00 3,120.00
255,470.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 255,470.00

20 1 m² Pasang bekisting untuk kolom

Kayu Kelas III (Kayu Nantu, dll.) 0.040 M³ 3,500,000.00 140,000.00


Paku Kayu 2" s/d 6" 0.400 Kg 18,000.00 7,200.00
Minyak bekisting 0.200 Ltr 10,500.00 2,100.00
Kayu Kelas III (Kayu Nantu, dll.) 0.015 M³ 3,500,000.00 52,500.00
Multipleks 9 mm 0.350 Lbr 110,000.00 38,500.00
Bambu / Dolken 2.000 Btg 21,500.00 43,000.00

Pekerja 0.660 Hari / Org 100,000.00 66,000.00


Tukang batu 0.330 Hari / Org 125,000.00 41,250.00
Kepala tukang 0.033 Hari / Org 150,000.00 4,950.00
Mandor 0.033 Hari / Org 120,000.00 3,960.00
399,460.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 399,460.00

21 1 m² Pasang bekisting untuk balok

Kayu Kelas III (Kayu Nantu, dll.) 0.040 M³ 3,500,000.00 140,000.00


Paku Kayu 2" s/d 6" 0.400 Kg 18,000.00 7,200.00
Minyak bekisting 0.200 Ltr 10,500.00 2,100.00
Kayu Kelas III (Kayu Nantu, dll.) 0.018 M³ 3,500,000.00 63,000.00
Multipleks 9 mm 0.350 Lbr 110,000.00 38,500.00

Harga Satuan Dinas PU Manado 2017 Halaman 82 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Bambu / Dolken 2.000 Btg 21,500.00 43,000.00

Pekerja 0.660 Hari / Org 100,000.00 66,000.00


Tukang batu 0.330 Hari / Org 125,000.00 41,250.00
Kepala tukang 0.033 Hari / Org 150,000.00 4,950.00
Mandor 0.033 Hari / Org 120,000.00 3,960.00
409,960.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 409,960.00

22 1 m² Pasang bekisting untuk lantai

Kayu Kelas III (Kayu Nantu, dll.) 0.040 M³ 3,500,000.00 140,000.00


Paku Kayu 2" s/d 6" 0.400 Kg 18,000.00 7,200.00
Minyak bekisting 0.200 Ltr 10,500.00 2,100.00
Kayu Kelas III (Kayu Nantu, dll.) 0.015 M³ 3,500,000.00 52,500.00
Multipleks 9 mm 0.350 Lbr 110,000.00 38,500.00
Bambu / Dolken 6.000 Btg 21,500.00 129,000.00

Pekerja 0.320 Hari / Org 100,000.00 32,000.00


Tukang batu 0.330 Hari / Org 125,000.00 41,250.00
Kepala tukang 0.033 Hari / Org 150,000.00 4,950.00
Mandor 0.033 Hari / Org 120,000.00 3,960.00
451,460.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 451,460.00

23 1 m² Pasang bekisting untuk tangga

Kayu Kelas III (Kayu Nantu, dll.) 0.030 M³ 3,500,000.00 105,000.00


Paku Kayu 2" s/d 6" 0.400 Kg 18,000.00 7,200.00
Minyak bekisting 0.150 Ltr 10,500.00 1,575.00
Kayu Kelas III (Kayu Nantu, dll.) 0.015 M³ 3,500,000.00 52,500.00
Multipleks 9 mm 0.350 Lbr 110,000.00 38,500.00
Bambu / Dolken 2.000 Btg 21,500.00 43,000.00

Pekerja 0.660 Hari / Org 100,000.00 66,000.00


Tukang batu 0.330 Hari / Org 125,000.00 41,250.00
Kepala tukang 0.033 Hari / Org 150,000.00 4,950.00
Mandor 0.033 Hari / Org 120,000.00 3,960.00
363,935.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 363,935.00

24 1 m² Jembatan untuk pengecoran beton

Kayu Kelas III (Kayu Nantu, dll.) 0.026 M³ 3,500,000.00 92,400.00


Paku Kayu 2" s/d 6" 0.600 Kg 18,000.00 10,800.00
Bambu / Dolken 0.500 Btg 21,500.00 10,750.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang batu 0.050 Hari / Org 125,000.00 6,250.00
Kepala tukang 0.005 Hari / Org 150,000.00 750.00
Mandor 0.008 Hari / Org 120,000.00 960.00
136,910.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 136,910.00

25 1 m³ Membuat pondasi beton bertulang (150 kg besi +


bekisting)

Kayu Kelas III (Kayu Nantu, dll.) 0.200 M³ 3,500,000.00 700,000.00


Paku Kayu 2" s/d 6" 1.500 Kg 18,000.00 27,000.00
Minyak bekisting 0.400 Ltr 10,500.00 4,200.00
Besi beton polos 157.500 Kg 11,700.00 1,842,750.00
Kawat Beton / Bendrat 2.250 Kg 23,100.00 51,975.00
Semen PC 336.000 Kg 1,333.47 448,047.18
Pasir Pasang / Beton 0.540 M³ 240,600.00 129,924.00
Kerikil Beton 0.810 M³ 333,100.00 269,811.00

Pekerja 5.300 Hari / Org 100,000.00 530,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Tukang kayu 1.300 Hari / Org 125,000.00 162,500.00
Tukang besi 1.050 Hari / Org 125,000.00 131,250.00
Kepala tukang 0.262 Hari / Org 150,000.00 39,300.00
Mandor 0.265 Hari / Org 120,000.00 31,800.00
4,402,932.18
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 4,402,932.18

26 1 m³
Membuat sloof beton bertulang (200 kg besi + bekisting)

Kayu Kelas III (Kayu Nantu, dll.) 0.270 M³ 3,500,000.00 945,000.00


Paku Kayu 2" s/d 6" 2.000 Kg 18,000.00 36,000.00

Harga Satuan Dinas PU Manado 2017 Halaman 83 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Minyak bekisting 0.600 Ltr 10,500.00 6,300.00


Besi beton polos 210.000 Kg 11,700.00 2,457,000.00
Kawat Beton / Bendrat 3.000 Kg 23,100.00 69,300.00
Semen PC 336.000 Kg 1,333.47 448,047.18
Pasir Pasang / Beton 0.540 M³ 240,600.00 129,924.00
Kerikil Beton 0.810 M³ 333,100.00 269,811.00

Pekerja 5.650 Hari / Org 100,000.00 565,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Tukang kayu 1.560 Hari / Org 125,000.00 195,000.00
Tukang besi 1.400 Hari / Org 125,000.00 175,000.00
Kepala tukang 0.323 Hari / Org 150,000.00 48,450.00
Mandor 0.283 Hari / Org 120,000.00 33,960.00
5,413,167.18
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 5,413,167.18

27 1 m³
Membuat kolom beton bertulang (300 kg besi + bekisting)

Kayu Kelas III (Kayu Nantu, dll.) 0.400 M³ 3,500,000.00 1,400,000.00


Paku Kayu 2" s/d 6" 4.000 Kg 18,000.00 72,000.00
Minyak bekisting 2.000 Ltr 10,500.00 21,000.00
Besi beton polos 315.000 Kg 11,700.00 3,685,500.00
Kawat Beton / Bendrat 4.500 Kg 23,100.00 103,950.00
Semen PC 336.000 Kg 1,333.47 448,047.18
Pasir Pasang / Beton 0.540 M³ 240,600.00 129,924.00
Kerikil Beton 0.810 M³ 333,100.00 269,811.00
Kayu Kelas III (Kayu Nantu, dll.) 0.150 M³ 3,500,000.00 525,000.00
Multipleks 9 mm 3.500 Lbr 110,000.00 385,000.00
Bambu / Dolken 20.000 Btg 21,500.00 430,000.00

Pekerja 7.050 Hari / Org 100,000.00 705,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Tukang kayu 1.650 Hari / Org 125,000.00 206,250.00
Tukang besi 2.100 Hari / Org 125,000.00 262,500.00
Kepala tukang 0.403 Hari / Org 150,000.00 60,450.00
Mandor 0.353 Hari / Org 120,000.00 42,360.00
8,781,167.18
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 8,781,167.18

28 1 m³
Membuat balok beton bertulang (200 kg besi + bekisting)

Kayu Kelas III (Kayu Nantu, dll.) 0.320 M³ 3,500,000.00 1,120,000.00


Paku Kayu 2" s/d 6" 3.200 Kg 18,000.00 57,600.00
Minyak bekisting 1.600 Ltr 10,500.00 16,800.00
Besi beton polos 210.000 Kg 11,700.00 2,457,000.00
Kawat Beton / Bendrat 3.000 Kg 23,100.00 69,300.00
Semen PC 336.000 Kg 1,333.47 448,047.18
Pasir Pasang / Beton 0.540 M³ 240,600.00 129,924.00
Kerikil Beton 0.810 M³ 333,100.00 269,811.00
Kayu Kelas III (Kayu Nantu, dll.) 0.140 M³ 3,500,000.00 490,000.00
Multipleks 9 mm 2.800 Lbr 110,000.00 308,000.00
Bambu / Dolken 16.000 Btg 21,500.00 344,000.00

Pekerja 6.350 Hari / Org 100,000.00 635,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Tukang kayu 1.650 Hari / Org 125,000.00 206,250.00
Tukang besi 1.400 Hari / Org 125,000.00 175,000.00
Kepala tukang 0.333 Hari / Org 150,000.00 49,950.00
Mandor 0.318 Hari / Org 120,000.00 38,160.00
6,849,217.18
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 6,849,217.18

29 1 m³
Membuat Kolom beton bertulang (150 kg besi+bekisting)

Kayu Kelas III (Kayu Nantu, dll.) 0.275 M³ 3,500,000.00 962,500.00


Paku Kayu 2" s/d 6" 1.650 Kg 18,000.00 29,700.00
Minyak bekisting 2.100 Ltr 10,500.00 22,050.00
Besi beton polos 157.500 Kg 11,700.00 1,842,750.00
Kawat Beton / Bendrat 2.250 Kg 23,100.00 51,975.00
Semen PC 336.000 Kg 1,333.47 448,047.18
Pasir Pasang / Beton 0.540 M³ 240,600.00 129,924.00
Kerikil Beton 0.810 M³ 333,100.00 269,811.00
Kayu Kelas III (Kayu Nantu, dll.) 0.150 M³ 3,500,000.00 525,000.00
Multipleks 9 mm 3.500 Lbr 110,000.00 385,000.00
Bambu / Dolken 20.000 Btg 21,500.00 430,000.00

Pekerja 5.300 Hari / Org 100,000.00 530,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Tukang kayu 1.300 Hari / Org 125,000.00 162,500.00
Tukang besi 1.050 Hari / Org 125,000.00 131,250.00
Kepala tukang 0.265 Hari / Org 150,000.00 39,750.00
Mandor 0.265 Hari / Org 120,000.00 31,800.00
6,026,432.18
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 6,026,432.18

Harga Satuan Dinas PU Manado 2017 Halaman 84 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

30 1 m³ Membuat dinding beton bertulang (150 kg besi +


bekisting)

Kayu Kelas III (Kayu Nantu, dll.) 0.240 M³ 3,500,000.00 840,000.00


Paku Kayu 2" s/d 6" 1.650 Kg 18,000.00 29,700.00
Minyak bekisting 1.400 Ltr 10,500.00 14,700.00
Besi beton polos 157.500 Kg 11,700.00 1,842,750.00
Kawat Beton / Bendrat 2.250 Kg 23,100.00 51,975.00
Semen PC 336.000 Kg 1,333.47 448,047.18
Pasir Pasang / Beton 0.540 M³ 240,600.00 129,924.00
Kerikil Beton 0.810 M³ 333,100.00 269,811.00
Kayu Kelas III (Kayu Nantu, dll.) 0.160 M³ 3,500,000.00 560,000.00
Multipleks 9 mm 2.800 Lbr 110,000.00 308,000.00
Bambu / Dolken 24.000 Btg 21,500.00 516,000.00

Pekerja 5.300 Hari / Org 100,000.00 530,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Tukang kayu 1.300 Hari / Org 125,000.00 162,500.00
Tukang besi 1.050 Hari / Org 125,000.00 131,250.00
Kepala tukang 0.265 Hari / Org 150,000.00 39,750.00
Mandor 0.265 Hari / Org 120,000.00 31,800.00
5,940,582.18
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 5,940,582.18

31 1 m³ Membuat tangga beton bertulang (200 kg besi +


bekisting)

Kayu Kelas III (Kayu Nantu, dll.) 0.250 M³ 3,500,000.00 875,000.00


Paku Kayu 2" s/d 6" 3.000 Kg 18,000.00 54,000.00
Minyak bekisting 1.200 Ltr 10,500.00 12,600.00
Besi beton polos 210.000 Kg 11,700.00 2,457,000.00
Kawat Beton / Bendrat 3.000 Kg 23,100.00 69,300.00
Semen PC 336.000 Kg 1,333.47 448,047.18
Pasir Pasang / Beton 0.540 M³ 240,600.00 129,924.00
Kerikil Beton 0.810 M³ 333,100.00 269,811.00
Kayu Kelas III (Kayu Nantu, dll.) 0.105 M³ 3,500,000.00 367,500.00
Multipleks 9 mm 2.500 Lbr 110,000.00 275,000.00
Bambu / Dolken 14.000 Btg 21,500.00 301,000.00

Pekerja 5.650 Hari / Org 100,000.00 565,000.00


Tukang batu 0.275 Hari / Org 125,000.00 34,375.00
Tukang kayu 1.560 Hari / Org 125,000.00 195,000.00
Tukang besi 1.400 Hari / Org 125,000.00 175,000.00
Kepala tukang 0.323 Hari / Org 150,000.00 48,450.00
Mandor 0.283 Hari / Org 120,000.00 33,960.00
6,310,967.18
Over Head, Keuntungan, Dll

Biaya Untuk 1 M3 6,310,967.18

32 1 m¹ Membuat Kolom praktis beton bertulang (11x11) cm

Kayu Kelas III (Kayu Nantu, dll.) 0.002 M³ 3,500,000.00 7,000.00


Paku Kayu 2" s/d 6" 0.010 Kg 18,000.00 180.00
Besi beton polos 3.000 Kg 11,700.00 35,100.00
Kawat Beton / Bendrat 0.045 Kg 23,100.00 1,039.50
Semen PC 4.000 Kg 1,333.47 5,333.90
Pasir Pasang / Beton 0.006 M³ 240,600.00 1,443.60
Kerikil Beton 0.009 M³ 333,100.00 2,997.90

Pekerja 0.180 Hari / Org 100,000.00 18,000.00


Tukang batu 0.020 Hari / Org 125,000.00 2,500.00
Tukang kayu 0.020 Hari / Org 125,000.00 2,500.00
Tukang besi 0.020 Hari / Org 125,000.00 2,500.00
Kepala tukang 0.006 Hari / Org 150,000.00 900.00
Mandor 0.009 Hari / Org 120,000.00 1,080.00
80,574.90
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 80,574.90

33 1 m¹ Membuat ring balok beton bertulang (10 x 15) cm

Kayu Kelas III (Kayu Nantu, dll.) 0.003 M³ 3,500,000.00 10,500.00


Paku Kayu 2" s/d 6" 0.020 Kg 18,000.00 360.00
Besi beton polos 3.600 Kg 11,700.00 42,120.00
Kawat Beton / Bendrat 0.050 Kg 23,100.00 1,155.00
Semen PC 5.500 Kg 1,333.47 7,334.11
Pasir Pasang / Beton 0.009 M³ 240,600.00 2,165.40
Kerikil Beton 0.015 M³ 333,100.00 4,996.50

Pekerja 0.297 Hari / Org 100,000.00 29,700.00


Tukang batu 0.033 Hari / Org 125,000.00 4,125.00
Tukang kayu 0.033 Hari / Org 125,000.00 4,125.00
Tukang besi 0.033 Hari / Org 125,000.00 4,125.00
Kepala tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.015 Hari / Org 120,000.00 1,800.00
114,006.01
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 114,006.01

Harga Satuan Dinas PU Manado 2017 Halaman 85 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

VII. PENUTUP ATAP

1 1 m² Pasang atap genteng kodok/glazzur

Genteng (setara Genteng Kodok) 25.000 Bh 35,000.00 875,000.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.075 Hari / Org 125,000.00 9,375.00
Kepala Tukang 0.008 Hari / Org 150,000.00 1,200.00
Mandor 0.008 Hari / Org 120,000.00 960.00
901,535.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 901,535.00

2 1 m² Pasang atap asbes gelombang Besar

Asbes Gelombang Besar 0.500 Lbr 40,000.00 20,000.00


Paku pancing 0.120 Kg 20,000.00 2,400.00

Pekerja 0.140 Hari / Org 100,000.00 14,000.00


Tukang kayu 0.075 Hari / Org 125,000.00 9,375.00
Kepala Tukang 0.008 Hari / Org 150,000.00 1,200.00
Mandor 0.008 Hari / Org 120,000.00 960.00
47,935.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 47,935.00

3 1 m² Pasang atap asbes gelombang Kecil

Asbes Gelombang Kecil 0.600 Lbr 26,500.00 15,900.00


Paku pancing 0.120 Kg 20,000.00 2,400.00

Pekerja 0.140 Hari / Org 100,000.00 14,000.00


Tukang kayu 0.075 Hari / Org 125,000.00 9,375.00
Kepala Tukang 0.008 Hari / Org 150,000.00 1,200.00
Mandor 0.008 Hari / Org 120,000.00 960.00
43,835.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 43,835.00

4 1 m² Pasang atap genteng beton

Genteng beton 11.000 Lbr 30,000.00 330,000.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00

Pekerja 0.200 Hari / Org 100,000.00 20,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.010 Hari / Org 120,000.00 1,200.00
365,740.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 365,740.00

5 1 m² Pasang atap genteng metal (setara multiroof)

Atap Genteng Metal (setara Multi Roof) 2.083 M² 68,750.00 143,226.88


Paku Genteng Metal 0.200 Kg 30,000.00 6,000.00

Pekerja 0.200 Hari / Org 100,000.00 20,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.001 Hari / Org 120,000.00 120.00
183,346.88
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 183,346.88

6 1 m² Pasang atap sirap

Genteng sirap 60.000 Bh 5,000.00 300,000.00


Paku Kayu 2" s/d 6" 0.200 Kg 18,000.00 3,600.00

Pekerja 0.166 Hari / Org 100,000.00 16,600.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.008 Hari / Org 120,000.00 960.00
356,160.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 356,160.00

Harga Satuan Dinas PU Manado 2017 Halaman 86 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

7 1 m¹ Pasang nok genteng beton

Nok genteng beton 3.500 Bh 35,000.00 122,500.00


Paku Kayu 2" s/d 6" 0.050 Kg 18,000.00 900.00
Semen warna 10.800 Kg 12,000.00 129,600.00
Pasir Pasang / Beton 0.032 M³ 240,600.00 7,699.20
Semen warna 1.000 Kg 12,000.00 12,000.00

Pekerja 0.400 Hari / Org 100,000.00 40,000.00


Tukang kayu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.020 Hari / Org 120,000.00 2,400.00
343,099.20
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 343,099.20

8 1 m¹ Pasang atap genteng aspal

Genteng aspal 2.000 Lbr 70,000.00 140,000.00


Paku Kayu 2" s/d 6" 0.050 Kg 18,000.00 900.00
Kayu Kelas III (Kayu Nantu, dll.) 0.004 M³ 3,500,000.00 12,250.00

Pekerja 0.125 Hari / Org 100,000.00 12,500.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.006 Hari / Org 120,000.00 720.00
201,370.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' pasang atap genteng aspal 201,370.00

9 1 m¹ Pasang nok sirap

Genteng sirap 0.400 Bh 5,000.00 2,000.00


Paku Kayu 2" s/d 6" 0.060 Kg 18,000.00 1,080.00
Paku Tripleks 0.050 Kg 22,500.00 1,125.00
Kayu Kelas III (Kayu Nantu, dll.) 0.004 M³ 3,500,000.00 14,000.00

Pekerja 0.125 Hari / Org 100,000.00 12,500.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.006 Hari / Org 120,000.00 720.00
63,345.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 63,345.00

10 1 m² Pasang atap seng gelombang

Seng Gelombang BJLS 24 0.700 Lbr 50,000.00 35,000.00


Paku Seng 0.020 Kg 22,000.00 440.00

Pekerja 0.120 Hari / Org 100,000.00 12,000.00


Tukang kayu 0.060 Hari / Org 125,000.00 7,500.00
Kepala Tukang 0.006 Hari / Org 150,000.00 900.00
Mandor 0.006 Hari / Org 120,000.00 720.00
56,560.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 56,560.00

11 1 m² Pasang atap nok seng

Seng Plat BJLS 25 0.300 Lbr 52,000.00 15,600.00


Paku Seng 0.040 Kg 22,000.00 880.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.070 Hari / Org 125,000.00 8,750.00
Kepala Tukang 0.008 Hari / Org 150,000.00 1,200.00
Mandor 0.006 Hari / Org 120,000.00 720.00
42,150.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 42,150.00

12 1 m² Pasang alumunium foil/sisalation

Alumunium foil 1.050 M² 50,000.00 52,500.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.050 Hari / Org 125,000.00 6,250.00
Kepala Tukang 0.005 Hari / Org 150,000.00 750.00
Mandor 0.008 Hari / Org 120,000.00 960.00
75,460.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 75,460.00

VIII. PEKERJAAN LANGIT - LANGIT

Harga Satuan Dinas PU Manado 2017 Halaman 87 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

1 1 m² Langit-langit plywood (30 x 60) cm, tebal 4 mm

Plywood 4 mm 0.360 Lbr 85,000.00 30,600.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00

Pekerja 0.070 Hari / Org 100,000.00 7,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.004 Hari / Org 120,000.00 420.00
52,560.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 52,560.00

2 1 m² Langit-langit plywood (30 x 60) cm, tebal 6 mm

Plywood 6 mm 0.360 Lbr 90,000.00 32,400.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00

Pekerja 0.070 Hari / Org 100,000.00 7,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.004 Hari / Org 120,000.00 420.00
54,360.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 54,360.00

3 1 m² Langit-langit plywood (60 x 120) cm, tebal 4 mm

Plywood 4 mm 0.375 Lbr 85,000.00 31,875.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00

Pekerja 0.070 Hari / Org 100,000.00 7,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.004 Hari / Org 120,000.00 420.00
53,835.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 53,835.00

4 1 m² Langit-langit plywood (60 x 120) cm, tebal 6 mm

Plywood 6 mm 0.375 Lbr 90,000.00 33,750.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00

Pekerja 0.070 Hari / Org 100,000.00 7,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.004 Hari / Org 120,000.00 420.00
55,710.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 55,710.00

5 1 m² Langit-langit teakwood (30 x 60) cm, tebal 4 mm

Plywood 4 mm 0.360 Lbr 85,000.00 30,600.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00

Pekerja 0.070 Hari / Org 100,000.00 7,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.004 Hari / Org 120,000.00 420.00
52,560.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 52,560.00

6 1 m² Langit-langit teakwood (60 x 120) cm, tebal 4 mm

Plywood 4 mm 0.375 Lbr 85,000.00 31,875.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00

Pekerja 0.070 Hari / Org 100,000.00 7,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.004 Hari / Org 120,000.00 420.00
53,835.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 53,835.00

7 1 m² Langit-langit lat kayu jati

Kayu Kelas I (Kayu Linggua,dll.) 0.024 M³ 8,500,000.00 204,000.00


Paku Kayu 2" s/d 6" 0.010 Kg 18,000.00 180.00
Paku sekrup 0.050 Kg 55,000.00 2,750.00

Harga Satuan Dinas PU Manado 2017 Halaman 88 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pekerja 0.200 Hari / Org 100,000.00 20,000.00


Tukang kayu 0.600 Hari / Org 125,000.00 75,000.00
Kepala Tukang 0.060 Hari / Org 150,000.00 9,000.00
Mandor 0.010 Hari / Org 120,000.00 1,200.00
312,130.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 312,130.00

8 1 m² Langit-langit softboard

Softboard 0.350 Lbr 60,000.00 21,000.00


Paku Kayu 2" s/d 6" 0.030 Kg 18,000.00 540.00

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.003 Hari / Org 120,000.00 360.00
95,900.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 95,900.00

9 1 m¹ List langit-langit kayu profil

Kayu Profil 3/3 1.100 Ujg 12,000.00 13,200.00


Paku Kayu 2" s/d 6" 0.010 Kg 18,000.00 180.00

Pekerja 0.050 Hari / Org 100,000.00 5,000.00


Tukang kayu 0.050 Hari / Org 125,000.00 6,250.00
Kepala Tukang 0.005 Hari / Org 150,000.00 750.00
Mandor 0.003 Hari / Org 120,000.00 360.00
25,740.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M' 25,740.00

10 1 m² Langit-langit asbes (1,00 x 1,00) m, tebal 3,2 mm rangka


kayu kelas III

Kayu Kelas III (Kayu Nantu, dll.) 0.012 M³ 3,500,000.00 42,000.00


Paku Kayu 2" s/d 6" 0.060 Kg 18,000.00 1,080.00
Eternit (Asbes) 1.100 M² 30,000.00 33,000.00

Pekerja 0.180 Hari / Org 100,000.00 18,000.00


Tukang kayu 0.320 Hari / Org 125,000.00 40,000.00
Kepala Tukang 0.032 Hari / Org 150,000.00 4,800.00
Mandor 0.009 Hari / Org 120,000.00 1,080.00
97,960.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 M2 97,960.00

IX. ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

1 1 Bh Memasang kloset duduk/monoblok

Kloset Monoblok Lokal 1.000 Bh 950,000.00 950,000.00


Perlengkapan 0.060 Ls 200.00 200.00

Pekerja 3.300 Hari / Org 100,000.00 330,000.00


Tukang batu 1.100 Hari / Org 125,000.00 137,500.00
Kepala Tukang 0.001 Hari / Org 150,000.00 150.00
Mandor 0.160 Hari / Org 120,000.00 19,200.00
1,437,050.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 Buah kloset 1,437,050.00

2 1 Bh Memasang kloset jongkok porselen

Kloset Jongkok Keramik Standar 1.000 Bh 175,000.00 175,000.00


Semen PC 6.000 Kg 1,333.47 8,000.84
Pasir Pasang / Beton 0.010 M³ 240,600.00 2,406.00

Pekerja 1.000 Hari / Org 100,000.00 100,000.00


Tukang batu 1.500 Hari / Org 125,000.00 187,500.00
Kepala Tukang 1.500 Hari / Org 150,000.00 225,000.00
Mandor 0.160 Hari / Org 120,000.00 19,200.00
542,106.84
Over Head, Keuntungan, Dll

Biaya Untuk 1 Buah kloset 542,106.84

3 1 Bh Memasang urinoir

Urinoir Keramik Standar 1.000 Bh 1,375,000.00 1,375,000.00


Perlengkapan 0.300 Ls 200.00 200.00
Semen PC 6.000 Kg 1,333.47 8,000.84

Harga Satuan Dinas PU Manado 2017 Halaman 89 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pasir Pasang / Beton 0.010 M³ 240,600.00 2,406.00

Pekerja 1.000 Hari / Org 100,000.00 100,000.00


Tukang batu 1.000 Hari / Org 125,000.00 125,000.00
Kepala Tukang 0.100 Hari / Org 150,000.00 15,000.00
Mandor 0.100 Hari / Org 120,000.00 12,000.00
1,637,606.84
Over Head, Keuntungan, Dll

Biaya Untuk 1 Buah Urinoir 1,637,606.84

4 1 Bh Memasang wastafel

Wastafel Gantung Keramik 1.000 Bh 552,480.00 552,480.00


Perlengkapan 0.120 Ls 200.00 200.00
Semen warna 6.000 Kg 12,000.00 72,000.00
Pasir Pasang / Beton 0.010 M³ 240,600.00 2,406.00

Pekerja 1.200 Hari / Org 100,000.00 120,000.00


Tukang batu 1.450 Hari / Org 125,000.00 181,250.00
Kepala Tukang 0.150 Hari / Org 150,000.00 22,500.00
Mandor 0.100 Hari / Org 120,000.00 12,000.00
962,836.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 Buah Wastafel 962,836.00

5 1 Bh Memasang bak mandi Fibreglass volume 0,30 M3

Bak Mandi Fiberglass 1.000 Bh 500,000.00 500,000.00


Perlengkapan 0.180 Ls 200.00 200.00

Pekerja 1.800 Hari / Org 100,000.00 180,000.00


Tukang batu 2.700 Hari / Org 125,000.00 337,500.00
Kepala Tukang 0.540 Hari / Org 150,000.00 81,000.00
Mandor 0.110 Hari / Org 120,000.00 13,200.00
1,111,900.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah bak mandi 1,111,900.00

6 1 Bh Memasang bak mandi batu bata volume 0,30 M3

Bata merah 0.400 Bh 850.00 340.00


Semen PC 120.000 Kg 1,333.47 160,016.85
Pasir Pasang / Beton 0.300 M³ 240,600.00 72,180.00
Tegel Keramik uk. 11x11 cm 360.000 Bh 1,100.00 396,000.00
Semen Warna 6.000 Kg 12,000.00 72,000.00

Pekerja 6.000 Hari / Org 100,000.00 600,000.00


Tukang batu 3.000 Hari / Org 125,000.00 375,000.00
Kepala Tukang 0.300 Hari / Org 150,000.00 45,000.00
Mandor 0.300 Hari / Org 120,000.00 36,000.00
1,756,536.85
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah bak mandi 1,756,536.85

7 1 Bh Membuat bak fiberglass volume 1 M3 air

Bak Mandi Fiberglass 1.000 Bh 500,000.00 500,000.00


Perlengkapan 0.120 Ls 200.00 200.00

Pekerja 3.000 Hari / Org 100,000.00 300,000.00


Tukang batu 4.500 Hari / Org 125,000.00 562,500.00
Kepala Tukang 0.900 Hari / Org 150,000.00 135,000.00
Mandor 0.900 Hari / Org 120,000.00 108,000.00
1,605,700.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah bak fibreglass 1,605,700.00

8 1 Bh Memasang bak kontrol pasangan batu bata ukuran


(30x30) cm, tinggi 35 cm

Bata merah 0.145 Bh 850.00 123.25


Semen PC 44.000 Kg 1,333.47 58,672.85
Pasir Pasang / Beton 0.070 M³ 240,600.00 16,842.00
Kerikil Beton 0.070 M³ 333,100.00 23,317.00
Besi beton polos 1.600 Kg 11,700.00 18,720.00
Pasir Pasang / Beton 0.060 M³ 240,600.00 14,436.00

Pekerja 3.200 Hari / Org 100,000.00 320,000.00


Tukang batu 1.015 Hari / Org 125,000.00 126,875.00
Kepala Tukang 0.002 Hari / Org 150,000.00 225.00
Mandor 0.016 Hari / Org 120,000.00 1,920.00
581,131.10
Over Head, Keuntungan, Dll

Biaya Untuk 1 bak kontrol 581,131.10

Harga Satuan Dinas PU Manado 2017 Halaman 90 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

9 1 Bh Memasang bak kontrol pasangan batu bata ukuran


(45x45) cm, tinggi 50 cm

Bata Merah 0.250 Bh 850.00 212.50


Semen PC 77.000 Kg 1,333.47 102,677.48
Pasir Pasang / Beton 0.130 M³ 240,600.00 31,278.00
Kerikil Beton 0.020 M³ 333,100.00 6,662.00
Besi beton polos 2.600 Kg 11,700.00 30,420.00
Pasir Pasang / Beton 0.090 M³ 240,600.00 21,654.00

Pekerja 1.420 Hari / Org 100,000.00 142,000.00


Tukang batu 0.473 Hari / Org 125,000.00 59,125.00
Kepala Tukang 0.047 Hari / Org 150,000.00 7,050.00
Mandor 0.071 Hari / Org 120,000.00 8,520.00
409,598.98
Over Head, Keuntungan, Dll

Biaya Untuk 1 bak kontrol 409,598.98

10 1 M¹ Memasang pipa galvanis (Medium A), diameter 1/2"

Pipa Galvanis (medium A) dia. 1/2" 1.200 M¹ 23,000.00 27,600.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.054 Hari / Org 100,000.00 5,400.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.027 Hari / Org 120,000.00 3,240.00
49,040.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pipa galvanis 49,040.00

11 1 M¹ Memasang pipa galvanis (Medium A), diameter 3/4"

Pipa Galvanis (medium A) dia. 3/4" 1.200 M¹ 32,000.00 38,400.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.054 Hari / Org 100,000.00 5,400.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.027 Hari / Org 120,000.00 3,240.00
59,840.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pipa galvanis 59,840.00

12 1 M¹ Memasang pipa galvanis (Medium A), diameter 1"

Pipa Galvanis (medium A) dia. 1" 1.200 M¹ 43,000.00 51,600.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.054 Hari / Org 100,000.00 5,400.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.027 Hari / Org 120,000.00 3,240.00
73,040.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pipa galvanis 73,040.00

13 1 M¹ Memasang pipa galvanis (Medium A), diameter 2"

Pipa Galvanis (medium A) dia. 2" 1.200 M¹ 77,000.00 92,400.00


Perlengkapan 0.350 Ls 200.00 200.00

Harga Satuan Dinas PU Manado 2017 Halaman 91 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pekerja 0.108 Hari / Org 100,000.00 10,800.00


Tukang batu 0.180 Hari / Org 125,000.00 22,500.00
Kepala Tukang 0.018 Hari / Org 150,000.00 2,700.00
Mandor 0.005 Hari / Org 120,000.00 648.00
129,248.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pipa galvanis 129,248.00

14 1 M¹ Memasang pipa galvanis (Medium A), diameter 3"

Pipa Galvanis (medium A) dia. 3" 1.200 M¹ 130,000.00 156,000.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.108 Hari / Org 100,000.00 10,800.00


Tukang batu 0.180 Hari / Org 125,000.00 22,500.00
Kepala Tukang 0.018 Hari / Org 150,000.00 2,700.00
Mandor 0.005 Hari / Org 120,000.00 648.00
192,848.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pipa galvanis 192,848.00

15 1 M¹ Memasang pipa PVC dia. 4" AW

Pipa PVC dia. 4" AW 1.200 M¹ 67,250.00 80,700.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.036 Hari / Org 100,000.00 3,600.00


Tukang batu 0.060 Hari / Org 125,000.00 7,500.00
Kepala Tukang 0.006 Hari / Org 150,000.00 900.00
Mandor 0.002 Hari / Org 120,000.00 216.00
93,116.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' 93,116.00

16 1 M¹ Memasang pipa PVC dia. 3" AW

Pipa PVC dia. 3" AW 1.200 M¹ 41,750.00 50,100.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.036 Hari / Org 100,000.00 3,600.00


Tukang batu 0.060 Hari / Org 125,000.00 7,500.00
Kepala Tukang 0.006 Hari / Org 150,000.00 900.00
Mandor 0.002 Hari / Org 120,000.00 216.00
62,516.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' 62,516.00

17 1 M¹ Memasang pipa PVC dia.2" AW

Pipa PVC dia. 2" AW 1.200 M¹ 21,250.00 25,500.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.036 Hari / Org 100,000.00 3,600.00


Tukang batu 0.060 Hari / Org 125,000.00 7,500.00
Kepala Tukang 0.006 Hari / Org 150,000.00 900.00
Mandor 0.002 Hari / Org 120,000.00 216.00
37,916.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' 37,916.00

18 1 M¹ Memasang pipa PVC dia. 1.5" AW

Pipa PVC dia. 1,5" AW 1.200 M¹ 17,500.00 21,000.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.036 Hari / Org 100,000.00 3,600.00


Tukang batu 0.060 Hari / Org 125,000.00 7,500.00
Kepala Tukang 0.006 Hari / Org 150,000.00 900.00
Mandor 0.002 Hari / Org 120,000.00 216.00
33,416.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' 33,416.00

19 1 M¹ Memasang pipa PVC dia. 1" AW

Pipa PVC dia. 1" AW 1.200 M¹ 9,625.00 11,550.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.054 Hari / Org 100,000.00 5,400.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.003 Hari / Org 120,000.00 324.00
30,074.00
Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2017 Halaman 92 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Biaya Untuk 1 m' 30,074.00

Harga Satuan Dinas PU Manado 2017 Halaman 93 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

20 1 M¹ Memasang pipa PVC dia. 3/4" AW

Pipa PVC (S-12,5) dia. 3/4" AW 1.200 M¹ 4,000.00 4,800.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.036 Hari / Org 100,000.00 3,600.00


Tukang batu 0.060 Hari / Org 125,000.00 7,500.00
Kepala Tukang 0.006 Hari / Org 150,000.00 900.00
Mandor 0.002 Hari / Org 120,000.00 216.00
17,216.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' 17,216.00

21 1 M¹ Memasang pipa PVC Dia. 1/2" AW

Pipa PVC (S-12,5) dia. 1/2" AW 1.200 M¹ 4,500.00 5,400.00


Perlengkapan 0.350 Ls 200.00 200.00

Pekerja 0.036 Hari / Org 100,000.00 3,600.00


Tukang batu 0.060 Hari / Org 125,000.00 7,500.00
Kepala Tukang 0.006 Hari / Org 150,000.00 900.00
Mandor 0.002 Hari / Org 120,000.00 216.00
17,816.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' 17,816.00

22 1 Bh Memasang kran diameter 3/4" atau 1/2"

Stop Kran 1/2" 1.000 Bh 35,000.00 35,000.00


Paper Tape 0.000 M¹ 1,000.00 0.25

Pekerja 0.010 Hari / Org 100,000.00 1,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.005 Hari / Org 120,000.00 600.00
50,600.25
Over Head, Keuntungan, Dll

Biaya Untuk 1 bh kran 50,600.25

23 1 Bh Memasang floor drain

Floor drain 1.000 Bh 20,000.00 20,000.00

Pekerja 0.010 Hari / Org 100,000.00 1,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.005 Hari / Org 120,000.00 600.00
35,600.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 floor drain 35,600.00

X. BESI DAN ALUMUNIUM

1 1 Kg Besi profil Kg 17,500.00

Besi profil 1.150 Kg 17,500.00 20,125.00

Pekerja 0.060 Hari / Org 100,000.00 6,000.00


Tukang las 0.060 Hari / Org 125,000.00 7,500.00
Kepala tukang 0.006 Hari / Org 150,000.00 900.00
Mandor 0.000 Hari / Org 120,000.00 36.00
34,561.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 Kg Besi profil 34,561.00

2 1 Kg Pasang rangka kuda-kuda baja IWF

Besi Profil 1.150 Kg 17,500.00 20,125.00

Pekerja 0.060 Hari / Org 100,000.00 6,000.00


Tukang las 0.060 Hari / Org 125,000.00 7,500.00
Kepala tukang 0.006 Hari / Org 150,000.00 900.00
Mandor 0.000 Hari / Org 120,000.00 36.00
34,561.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 Kg pasang rangka atap baja 34,561.00

3 100 Kg Pekerjaan perakitan

Harga Satuan Dinas PU Manado 2017 Halaman 94 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

S o l a r (HET) 1.000 Ltr 12,376.48 12,376.48


Minyak Pelumas / Oli (Pertamina) 0.100 Ltr 34,080.00 3,408.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang las 0.100 Hari / Org 125,000.00 12,500.00
Kepala tukang 0.001 Hari / Org 150,000.00 150.00
Mandor 0.005 Hari / Org 120,000.00 600.00
Sewa alat 0.800 39,034.48
Over Head, Keuntungan, Dll

Biaya Untuk 100 Kg Pekerjaan perakitan 39,034.48

4 1 m² Pintu besi plat baja tebal 2mm rangkap, rangka baja siku

Besi Siku 3 x 3 x 3 15.000 M¹ 95,000.00 1,425,000.00


Besi strip 32.800 Kg 88,000.00 2,886,400.00
Kawat las 0.050 Kg 30,000.00 1,500.00

Pekerja 1.050 Hari / Org 100,000.00 105,000.00


Tukang las 1.050 Hari / Org 125,000.00 131,250.00
Kepala tukang 0.105 Hari / Org 150,000.00 15,750.00
Mandor 0.052 Hari / Org 120,000.00 6,240.00

Over Head, Keuntungan, Dll -

Biaya Untuk 1 m2 pasang pintu besi baja -

5 100 cm Pengelasan dengan las listrik

Kawat Las 0.400 Kg 30,000.00 12,000.00


S o l a r (HET) 0.300 Ltr 12,376.48 3,712.94
Minyak Pelumas / Oli (Pertamina) 0.040 Ltr 34,080.00 1,363.20

Pekerja 0.040 Hari / Org 100,000.00 4,000.00


Tukang las 0.020 Hari / Org 125,000.00 2,500.00
Kepala tukang 0.002 Hari / Org 150,000.00 300.00
Mandor 0.002 Hari / Org 120,000.00 240.00
Sewa alat 0.170 24,116.14
Over Head, Keuntungan, Dll

Biaya Untuk 100 cm Pengelasan dengan las listrik 24,116.14

6 1 m² Pasang jendela besi

Jendela besi 1.000 M² 750,000.00 750,000.00

Tukang Las 1.050 Hari / Org 125,000.00 131,250.00


Pekerja 1.050 Hari / Org 100,000.00 105,000.00
Kepala Tukang 0.105 Hari / Org 150,000.00 15,750.00
Mandor 0.005 Hari / Org 120,000.00 630.00
1,002,630.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang jendela besi 1,002,630.00

7 1 m² Pasang jendela besi tahan api

Jendela besi tahan api 1.000 M² 900,000.00 900,000.00

Tukang Las 1.200 Hari / Org 125,000.00 150,000.00


Pekerja 1.022 Hari / Org 100,000.00 102,200.00
Kepala Tukang 0.120 Hari / Org 150,000.00 18,000.00
Mandor 0.006 Hari / Org 120,000.00 720.00
1,170,920.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang jendela besi tahan api 1,170,920.00

8 1 m² Pasang pintu gulung besi

Pintu gulung besi 1.000 M² 750,000.00 750,000.00

Tukang Las 1.200 Hari / Org 125,000.00 150,000.00


Pekerja 1.200 Hari / Org 100,000.00 120,000.00
Kepala Tukang 0.120 Hari / Org 150,000.00 18,000.00
Mandor 0.006 Hari / Org 120,000.00 720.00
1,038,720.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang pintu gulung besi 1,038,720.00

9 1 m² Pasang pintu lipat

Pintu lipat 1.000 M² 750,000.00 750,000.00

Tukang Las 1.050 Hari / Org 125,000.00 131,250.00


Pekerja 1.050 Hari / Org 100,000.00 105,000.00
Kepala Tukang 0.105 Hari / Org 150,000.00 15,750.00
Mandor 0.005 Hari / Org 120,000.00 624.00
1,002,624.00
Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2017 Halaman 95 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Biaya Untuk 1 m2 pasang pintu lipat 1,002,624.00

10 1 m² Pasang pintu Sunscreen alumunium

Sunscreen alumunium 1.000 M² 125,000.00 125,000.00

Tukang Las 0.800 Hari / Org 125,000.00 100,000.00


Pekerja 0.080 Hari / Org 100,000.00 8,000.00
Kepala Tukang 0.080 Hari / Org 150,000.00 12,000.00
Mandor 0.004 Hari / Org 120,000.00 480.00
245,480.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang pintu sunscreen alumunium 245,480.00

11 1 m² Pasang Rolling door

Rolling Door 1.000 M² 450,000.00 450,000.00

Pekerja 1.200 Hari / Org 100,000.00 120,000.00


Tukang las 1.200 Hari / Org 125,000.00 150,000.00
Kepala tukang 0.120 Hari / Org 150,000.00 18,000.00
Mandor 0.006 Hari / Org 120,000.00 720.00
738,720.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang Rolling Door 738,720.00

12 1 m² Pasang pintu alumunium

Pintu alumunium 1.000 M² 275,000.00 275,000.00

Tukang Las 1.050 Hari / Org 125,000.00 131,250.00


Pekerja 1.050 Hari / Org 100,000.00 105,000.00
Kepala Tukang 0.105 Hari / Org 150,000.00 15,750.00
Mandor 0.005 Hari / Org 120,000.00 624.00
527,624.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang pintu alumunium 527,624.00

13 1 m² Pasang venetions blinds

Venetion blinds 1.000 M² 60,000.00 60,000.00

Tukang kayu 0.350 Hari / Org 125,000.00 43,750.00


Pekerja 0.350 Hari / Org 100,000.00 35,000.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.002 Hari / Org 120,000.00 210.00
144,210.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang venetions blinds 144,210.00

14 1 m² Pasang Venetion blinds

Venetion blinds 1.000 M² 60,000.00 60,000.00

Tukang kayu 0.350 Hari / Org 125,000.00 43,750.00


Pekerja 0.350 Hari / Org 100,000.00 35,000.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.002 Hari / Org 120,000.00 210.00
144,210.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang vertikals blinds 144,210.00

15 1 m² Pasang trali besi

Besi strip 11.500 Kg 88,000.00 1,012,000.00

Tukang las 1.200 Hari / Org 125,000.00 150,000.00


Pekerja 1.200 Hari / Org 100,000.00 120,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.001 Hari / Org 120,000.00 72.00
1,283,872.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang trali besi 1,283,872.00

16 1 m² Pasang kawat harmonika

Kawat harmonika 1.100 M² 31,250.00 34,375.00


Paku Tripleks 0.020 Kg 22,500.00 450.00
Kayu Kelas III (Kayu Nantu, dll.) 0.002 M³ 3,500,000.00 6,300.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00

Harga Satuan Dinas PU Manado 2017 Halaman 96 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00


Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.001 Hari / Org 120,000.00 60.00
65,185.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kawat harmonika 65,185.00

17 1 m² Pasang kawat nyamuk

Kawat Harmonika 1.100 M² 31,250.00 34,375.00


Paku Tripleks 0.020 Kg 22,500.00 450.00
Kayu Kelas III (Kayu Nantu, dll.) 0.002 M³ 3,500,000.00 6,300.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.001 Hari / Org 120,000.00 60.00
65,185.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kawat nyamuk 65,185.00

18 1 m² Pasang kawat kassa

Kawat Nyamuk/Kasa Plastik 1.100 M² 15,000.00 16,500.00


Paku Tripleks 0.020 Kg 22,500.00 450.00
Kayu Kelas III (Kayu Nantu, dll.) 0.002 M³ 3,500,000.00 6,300.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.001 Hari / Org 120,000.00 60.00
47,310.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kawat kassa 47,310.00

19 1 m² Pasang kawat burung

Kawat burung 1.100 M² 17,500.00 19,250.00


Paku Tripleks 0.020 Kg 22,500.00 450.00
Kayu Kelas III (Kayu Nantu, dll.) 0.002 M³ 3,500,000.00 6,300.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.001 Hari / Org 120,000.00 60.00
50,060.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kawat burung 50,060.00

20 1 m² Pasang jendela nako & tralis

Naco (Kerangka dan Daun) 1.100 M² 472,500.00 519,750.00


Paku Sekrup 0.020 Kg 55,000.00 1,100.00
Besi strip 0.025 Kg 88,000.00 2,200.00

Pekerja 0.200 Hari / Org 100,000.00 20,000.00


Tukang kayu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.001 Hari / Org 120,000.00 120.00
571,170.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 jendela nako & tralis 571,170.00

21 1 m¹ Pasang talang datar, seng bjls 25

Seng Plat BJLS 25 0.500 Lbr 52,000.00 26,000.00


Paku Kayu 2" s/d 6" 0.015 Kg 18,000.00 270.00
Kayu Kelas III (Kayu Nantu, dll.) 0.010 M³ 3,500,000.00 33,600.00
Cat Menie Kayu/Besi/Seng (Glotex Setara) 0.250 Kg 40,000.00 10,000.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.400 Hari / Org 125,000.00 50,000.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.001 Hari / Org 120,000.00 150.00
138,770.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang talang datar, seng bjls 25 138,770.00

22 1 m¹ Pasang talang miring, seng bjls 25

Seng Gelombang BJLS 25 0.500 Lbr 57,500.00 28,750.00


Paku Kayu 2" s/d 6" 0.015 Kg 18,000.00 270.00
Kayu Kelas III (Kayu Nantu, dll.) 0.019 M³ 3,500,000.00 66,500.00
Cat Menie Kayu/Besi/Seng (Glotex Setara) 0.300 Kg 40,000.00 12,000.00

Harga Satuan Dinas PU Manado 2017 Halaman 97 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pekerja 0.040 Hari / Org 100,000.00 4,000.00


Tukang kayu 0.400 Hari / Org 125,000.00 50,000.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.001 Hari / Org 120,000.00 150.00
165,420.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang talang miring, seng bjls 25 165,420.00

23 1 m¹ Pasang talang 1/2 lingkaran D -10 cm, seng bjls 25

Seng Gelombang BJLS 25 0.300 Lbr 57,500.00 17,250.00


Paku Kayu 2" s/d 6" 0.100 Kg 18,000.00 1,800.00
Kayu Kelas III (Kayu Nantu, dll.) 0.019 M³ 3,500,000.00 66,500.00
Cat Menie Kayu/Besi/Seng (Glotex Setara) 0.500 Kg 40,000.00 20,000.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.001 Hari / Org 120,000.00 150.00
155,700.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang talang 1/2 lingkaran Dia. 10 cm 155,700.00

24 1 m¹ Pasang talang 1/2 lingkaran D -10 cm, seng bjls 24

Seng Gelombang BJLS 25 0.300 Lbr 57,500.00 17,250.00


Paku Kayu 2" s/d 6" 0.100 Kg 18,000.00 1,800.00
Kayu Kelas III (Kayu Nantu, dll.) 0.019 M³ 3,500,000.00 66,500.00
Besi strip 0.500 Kg 88,000.00 44,000.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.001 Hari / Org 120,000.00 150.00
179,700.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang talang 1/2 lingkaran Dia. 10 cm 179,700.00

XI. KUNCI DAN KACA

1 1 Bh Pasang kunci tanam biasa

Kunci tanam biasa 1.000 Bh 75,000.00 75,000.00

Pekerja 0.010 Hari / Org 100,000.00 1,000.00


Tukang kayu 0.500 Hari / Org 125,000.00 62,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.005 Hari / Org 120,000.00 600.00
140,600.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah pasang kunci tanam biasa 140,600.00

2 1 Bh Pasang kunci tanam kamar mandi

Kunci Tanam Biasa 1.000 Bh 75,000.00 75,000.00

Pekerja 0.005 Hari / Org 100,000.00 500.00


Tukang kayu 0.500 Hari / Org 125,000.00 62,500.00
Kepala Tukang 0.005 Hari / Org 150,000.00 750.00
Mandor 0.003 Hari / Org 120,000.00 300.00
139,050.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah pasang kunci tanam kamar mandi 139,050.00

3 1 Bh Pasang kunci silinder

Kunci Silinder Putar 1.000 Bh 75,000.00 75,000.00

Pekerja 0.005 Hari / Org 100,000.00 500.00


Tukang kayu 0.500 Hari / Org 125,000.00 62,500.00
Kepala Tukang 0.005 Hari / Org 150,000.00 750.00
Mandor 0.000 Hari / Org 120,000.00 30.00
138,780.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah pasang kunci silinder 138,780.00

4 1 Bh Pasang engsel pintu

Engsel Biasa 3" 1.000 Bh 10,000.00 10,000.00

Pekerja 0.015 Hari / Org 100,000.00 1,500.00


Tukang kayu 0.150 Hari / Org 125,000.00 18,750.00

Harga Satuan Dinas PU Manado 2017 Halaman 98 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00


Mandor 0.001 Hari / Org 120,000.00 90.00
32,590.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah engsel pintu 32,590.00

5 1 Bh Pasang engsel jendela kupu-kupu

Engsel Biasa 2 1/2" 1.000 Bh 7,500.00 7,500.00

Pekerja 0.010 Hari / Org 100,000.00 1,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.001 Hari / Org 120,000.00 60.00
22,560.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah engsel jendela kupu-kupu 22,560.00

6 1 Bh Pasang engsel angin

Hak Angin Biasa 1.000 Bh 5,000.00 5,000.00

Pekerja 0.020 Hari / Org 100,000.00 2,000.00


Tukang kayu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.010 Hari / Org 120,000.00 1,200.00
36,200.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah engsel angin 36,200.00

7 1 Bh Pasang kait angin

Kait angin 1.000 Bh 17,500.00 17,500.00

Pekerja 0.015 Hari / Org 100,000.00 1,500.00


Tukang kayu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.001 Hari / Org 120,000.00 90.00
40,090.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah pasang kait angin 40,090.00

8 1 Bh Pasang door closer

Door closer 1.000 Bh 750,000.00 750,000.00

Pekerja 0.050 Hari / Org 100,000.00 5,000.00


Tukang kayu 0.500 Hari / Org 125,000.00 62,500.00
Kepala Tukang 0.050 Hari / Org 150,000.00 7,500.00
Mandor 0.003 Hari / Org 120,000.00 300.00
825,300.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah pasang door closer 825,300.00

9 1 Bh Pasang kunci selot

Kunci selot 1.000 Bh 30,000.00 30,000.00

Pekerja 0.020 Hari / Org 100,000.00 2,000.00


Tukang kayu 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.001 Hari / Org 120,000.00 120.00
60,120.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah pasang kunci selot 60,120.00

10 1 Bh Pasang pegangan pintu / door holder

Door holder 1.000 Bh 250,000.00 250,000.00

Pekerja 0.050 Hari / Org 100,000.00 5,000.00


Tukang kayu 0.500 Hari / Org 125,000.00 62,500.00
Kepala Tukang 0.050 Hari / Org 150,000.00 7,500.00
Mandor 0.003 Hari / Org 120,000.00 300.00
325,300.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah pasang pegangan pintu 325,300.00

11 1 Bh Pasang door stop

Door stop 1.000 Bh 50,000.00 50,000.00

Harga Satuan Dinas PU Manado 2017 Halaman 99 dari 127 halaman


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pekerja 0.010 Hari / Org 100,000.00 1,000.00


Tukang kayu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.010 Hari / Org 150,000.00 1,500.00
Mandor 0.001 Hari / Org 120,000.00 60.00
65,060.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah pasang door stop 65,060.00

12 1 Bh Pasang rel pintu dorong

Rel Pengaman (Guard Rail) 1.000 M¹ 412,500.00 412,500.00

Pekerja 0.060 Hari / Org 100,000.00 6,000.00


Tukang kayu 0.600 Hari / Org 125,000.00 75,000.00
Kepala Tukang 0.060 Hari / Org 150,000.00 9,000.00
Mandor 0.003 Hari / Org 120,000.00 360.00
502,860.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah pasang rel pintu dorong 502,860.00

13 1 Bh Pasang kunci lemari

Kunci lemari 1.000 Bh 25,000.00 25,000.00

Pekerja 0.025 Hari / Org 100,000.00 2,500.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.001 Hari / Org 120,000.00 150.00
62,650.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 buah pasang kunci lemari 62,650.00

14 1 m² Pasang kaca, tebal 3 mm

Kaca Polos 3 mm 1.100 M² 123,000.00 135,300.00

Pekerja 0.015 Hari / Org 100,000.00 1,500.00


Tukang kayu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.001 Hari / Org 120,000.00 90.00
157,890.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kaca tebal 3 mm 157,890.00

15 1 m² Pasang kaca, tebal 5 mm

Kaca Polos 5 mm 1.100 M² 158,000.00 173,800.00

Pekerja 0.015 Hari / Org 100,000.00 1,500.00


Tukang kayu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.001 Hari / Org 120,000.00 90.00
196,390.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kaca tebal 5 mm 196,390.00

16 1 m² Pasang kaca, tebal 8 mm

Kaca Polos 8 mm 1.100 M² 185,000.00 203,500.00

Pekerja 0.017 Hari / Org 100,000.00 1,650.00


Tukang kayu 0.165 Hari / Org 125,000.00 20,625.00
Kepala Tukang 0.017 Hari / Org 150,000.00 2,475.00
Mandor 0.001 Hari / Org 120,000.00 96.00
228,346.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kaca tebal 8 mm 228,346.00

17 1 m² Pasang kaca buram, tebal 12 mm

Kaca Buram 12 mm 1.100 M² 307,500.00 338,250.00


Sealent 0.050 Kg 84,000.00 4,200.00

Pekerja 0.025 Hari / Org 100,000.00 2,500.00


Tukang kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.001 Hari / Org 120,000.00 150.00
41,850.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kaca buram tebal 12 mm 41,850.00

Harga Satuan Dinas PU Manado 2017 Halaman 100 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

18 1 m² Pasang kaca cermin, tebal 5 mm

Kaca cermin tebal 5 mm 1.100 M² 164,000.00 180,400.00

Pekerja 0.015 Hari / Org 100,000.00 1,500.00


Tukang kayu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.001 Hari / Org 120,000.00 90.00
202,990.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kaca cermin tebal 5 mm 202,990.00

19 1 m² Pasang kaca cermin, tebal 8 mm

Kaca cermin tebal 8 mm 1.100 M² 204,000.00 224,400.00

Pekerja 0.015 Hari / Org 100,000.00 1,500.00


Tukang kayu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.001 Hari / Org 120,000.00 90.00
246,990.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kaca cermin tebal 5 mm 246,990.00

20 1 m² Pasang kaca cermin, tebal 8 mm

Kaca cermin tebal 8 mm 1.100 M² 204,000.00 224,400.00

Pekerja 0.017 Hari / Org 100,000.00 1,650.00


Tukang kayu 0.165 Hari / Org 125,000.00 20,625.00
Kepala Tukang 0.017 Hari / Org 150,000.00 2,475.00
Mandor 0.001 Hari / Org 120,000.00 96.00
249,246.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kaca cermin tebal 8 mm 249,246.00

21 1 m² Pasang kaca "wireglass, tebal 5 mm

Kaca wireglass 1.100 M² 150,000.00 165,000.00

Pekerja 0.015 Hari / Org 100,000.00 1,500.00


Tukang kayu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.001 Hari / Org 120,000.00 90.00
187,590.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kaca "wireglass tebal 5 mm 187,590.00

22 1 m² Pasang kaca patri, tebal 5 mm

Kaca patri 1.100 M² 300,000.00 330,000.00

Pekerja 0.015 Hari / Org 100,000.00 1,500.00


Tukang kayu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.001 Hari / Org 120,000.00 90.00
352,590.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang kaca patri tebal 5 mm 352,590.00

XII. PEKERJAAN PENUTUP LANTAI

1 1 m² Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm

Tegel Abu-Abu uk. 40x40 cm 6.630 Bh 9,500.00 62,985.00


Semen PC 9.800 Kg 1,333.47 13,068.04
Pasir Pasang / Beton 0.022 M³ 240,600.00 5,172.90

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang batu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.013 Hari / Org 120,000.00 1,500.00
124,525.94
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang ubin pc abu-abu ukuran 40 x 40


cm 124,525.94

1 1 m² Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm

Tegel Abu-Abu uk. 30x30 cm 11.870 Bh 4,700.00 55,789.00


Semen PC 10.000 Kg 1,333.47 13,334.74

Harga Satuan Dinas PU Manado 2017 Halaman 101 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pasir Pasang / Beton 0.022 M³ 240,600.00 5,172.90

Pekerja 0.260 Hari / Org 100,000.00 26,000.00


Tukang batu 0.125 Hari / Org 125,000.00 15,625.00
Kepala Tukang 0.013 Hari / Org 150,000.00 1,875.00
Mandor 0.013 Hari / Org 120,000.00 1,560.00
119,356.64
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang ubin pc abu-abu ukuran 30 x 30


cm 119,356.64

2 1 m² Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm

Tegel Abu-Abu uk. 20x20 cm 26.500 Bh 2,000.00 53,000.00


Semen PC 10.400 Kg 1,333.47 13,868.13
Pasir Pasang / Beton 0.014 M³ 240,600.00 3,248.10

Pekerja 0.270 Hari / Org 100,000.00 27,000.00


Tukang batu 0.130 Hari / Org 125,000.00 16,250.00
Kepala Tukang 0.013 Hari / Org 150,000.00 1,950.00
Mandor 0.014 Hari / Org 120,000.00 1,620.00
116,936.23
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang ubin pc abu-abu ukuran 20 x 20


cm 116,936.23

3 1 m² Pasang lantai ubin warna ukuran 40 x 40 cm

Tegel Berwarna uk. 40x40 cm 6.630 Bh 9,500.00 62,985.00


Semen PC 8.160 Kg 1,333.47 10,881.15
Pasir Pasang / Beton 0.023 M³ 240,600.00 5,533.80
Semen warna 0.900 Kg 12,000.00 10,800.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang batu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.013 Hari / Org 120,000.00 1,500.00
133,499.95
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang ubin warna ukuran 40 x 40 cm 133,499.95

4 1 m² Pasang lantai ubin warna ukuran 30 x 30 cm

Tegel Berwarna uk. 30x30 cm 11.870 Bh 5,000.00 59,350.00


Semen PC 8.360 Kg 1,333.47 11,147.84
Pasir Pasang / Beton 0.023 M³ 240,600.00 5,533.80
Semen warna 0.900 Kg 12,000.00 10,800.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang batu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.013 Hari / Org 120,000.00 1,500.00
130,131.64
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang ubin warna ukuran 30 x 30 cm 130,131.64

5 1 m² Pasang lantai ubin warna ukuran 20 x 20 cm

Tegel Berwarna uk. 20x20 cm 26.500 Bh 2,250.00 59,625.00


Semen PC 8.760 Kg 1,333.47 11,681.23
Pasir Pasang / Beton 0.023 M³ 240,600.00 5,533.80
Semen warna 0.900 Kg 12,000.00 10,800.00

Pekerja 0.270 Hari / Org 100,000.00 27,000.00


Tukang batu 0.130 Hari / Org 125,000.00 16,250.00
Kepala Tukang 0.013 Hari / Org 150,000.00 1,950.00
Mandor 0.014 Hari / Org 120,000.00 1,620.00
134,460.03
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang ubin warna ukuran 20 x 20 cm 134,460.03

6 1 m² Pasang lantai granito warna ukuran 40 x 40 cm

Tegel Granito uk. 40x40 cm 6.930 Bh 30,000.00 207,900.00


Semen PC 9.800 Kg 1,333.47 13,068.04
Pasir Pasang / Beton 0.022 M³ 240,600.00 5,172.90
Semen warna 1.300 Kg 12,000.00 15,600.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang batu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.013 Hari / Org 120,000.00 1,500.00
285,040.94

Harga Satuan Dinas PU Manado 2017 Halaman 102 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai granito ukuran 40 x 40 cm 285,040.94

7 1 m² Pasang lantai granito warna ukuran 30 x 30 cm

Tegel Granito uk. 30x30 cm 11.870 Bh 50,000.00 593,500.00


Semen PC 10.000 Kg 1,333.47 13,334.74
Pasir Pasang / Beton 0.022 M³ 240,600.00 5,172.90
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.260 Hari / Org 100,000.00 26,000.00


Tukang batu 0.125 Hari / Org 125,000.00 15,625.00
Kepala Tukang 0.013 Hari / Org 150,000.00 1,875.00
Mandor 0.013 Hari / Org 120,000.00 1,560.00
675,067.64
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai granito ukuran 30 x 30 cm 675,067.64

8 1 m² Pasang lantai teralus kerang ukuran 40 x 40 cm

Tegel teralux marmer uk. 40 x 40 cm 6.250 Bh 85,000.00 531,250.00


Semen PC 8.800 Kg 1,333.47 11,734.57
Pasir Pasang / Beton 0.022 M³ 240,600.00 5,172.90
Semen warna 1.300 Kg 12,000.00 15,600.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang batu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.013 Hari / Org 120,000.00 1,500.00
607,057.47
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai teralux kerang ukuran 40 x


40 cm 607,057.47

9 1 m² Pasang lantai ubin teralux kerang ukuran 30 x 30 cm

Tegel teralux kerang uk. 30 x 30 cm 11.870 Bh 28,000.00 332,360.00


Semen PC 10.000 Kg 1,333.47 13,334.74
Pasir Pasang / Beton 0.022 M³ 240,600.00 5,172.90
Semen warna 1.125 Kg 12,000.00 13,500.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang batu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.013 Hari / Org 120,000.00 1,500.00
407,667.64
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai teralux kerang ukuran 30 x


30 cm 407,667.64

10 1 m² Pasang lantai ubin teralux marmer ukuran 60 x 60 cm

Tegel teralux marmer uk. 60 x 60 cm 3.100 Bh 150,000.00 465,000.00


Semen PC 8.190 Kg 1,333.47 10,921.15
Pasir Pasang / Beton 0.045 M³ 240,600.00 10,827.00
Semen warna 1.000 Kg 12,000.00 12,000.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang batu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.013 Hari / Org 120,000.00 1,500.00
542,048.15
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai ubin teralux marmer


ukuran 60 x 60 cm 542,048.15

11 1 m² Pasang lantai ubin teralux marmer ukuran 40 x 40 cm

Tegel teralux kerang uk. 40 x 40 cm 6.250 Bh 42,000.00 262,500.00


Semen PC 8.800 Kg 1,333.47 11,734.57
Pasir Pasang / Beton 0.022 M³ 240,600.00 5,172.90
Semen warna 1.300 Kg 12,000.00 15,600.00

Pekerja 0.672 Hari / Org 100,000.00 67,200.00


Tukang batu 0.224 Hari / Org 125,000.00 28,000.00
Kepala Tukang 0.220 Hari / Org 150,000.00 33,000.00
Mandor 0.034 Hari / Org 120,000.00 4,080.00
427,287.47
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai teralux marmer ukuran 40


x 40 cm 427,287.47

12 1 m¹ Pasang plint ubin pc abuabu ukuran 15 x 30 cm

Harga Satuan Dinas PU Manado 2017 Halaman 103 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Tegel Plint pc abu-abu uk. 15x30 cm 3.300 Bh 1,750.00 5,775.00


Semen PC 1.560 Kg 1,333.47 2,080.22
Pasir Pasang / Beton 0.004 M³ 240,600.00 962.40

Pekerja 0.060 Hari / Org 100,000.00


Tukang batu 0.030 Hari / Org 125,000.00 3,750.00
Kepala Tukang 0.003 Hari / Org 150,000.00 450.00
Mandor 0.003 Hari / Org 120,000.00 360.00
13,377.62
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin pc abu-abu ukuran 15 x


30 cm 13,377.62

13 1 m¹ Pasang plint ubin pc abu-abu ukuran 10 x 30 cm

Tegel Plint pc abu-abu uk. 10x30 cm 3.300 Bh 1,500.00 4,950.00


Semen PC 1.560 Kg 1,333.47 2,080.22
Pasir Pasang / Beton 0.003 M³ 240,600.00 721.80

Pekerja 0.060 Hari / Org 100,000.00


Tukang batu 0.030 Hari / Org 125,000.00 3,750.00
Kepala Tukang 0.003 Hari / Org 150,000.00 450.00
Mandor 0.003 Hari / Org 120,000.00 360.00
12,312.02
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin pc abu-abu ukuran 10 x


30 cm 12,312.02

14 1 m¹ Pasang plint ubin pc abu-abu ukuran 10 x 40 cm

Tegel Plint pc abu-abu uk. 10x40 cm 2.650 Bh 1,600.00 4,240.00


Semen PC 1.560 Kg 1,333.47 2,080.22
Pasir Pasang / Beton 0.003 M³ 240,600.00 721.80

Pekerja 0.060 Hari / Org 100,000.00


Tukang batu 0.030 Hari / Org 125,000.00 3,750.00
Kepala Tukang 0.003 Hari / Org 150,000.00 450.00
Mandor 0.003 Hari / Org 120,000.00 360.00
11,602.02
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin pc abu-abu ukuran 10 x


40 cm 11,602.02

15 1 m¹ Pasang plint ubin pc warna ukuran 10 x 20 cm

Tegel Plint warna uk. 10x20 cm 5.300 Bh 2,250.00 11,925.00


Semen PC 1.200 Kg 1,333.47 1,600.17
Pasir Pasang / Beton 0.003 M³ 240,600.00 721.80
Semen warna 0.190 Kg 12,000.00 2,280.00

Pekerja 0.060 Hari / Org 100,000.00 6,000.00


Tukang batu 0.030 Hari / Org 125,000.00 3,750.00
Kepala Tukang 0.003 Hari / Org 150,000.00 450.00
Mandor 0.003 Hari / Org 120,000.00 360.00
27,086.97
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin pc warna ukuran 10 x


20 cm 27,086.97

16 1 m¹ Pasang plint ubin pc warna ukuran 10 x 40 cm

Tegel Plint pc warna uk. 10x40 cm 2.650 Bh 2,800.00 7,420.00


Semen PC 1.200 Kg 1,333.47 1,600.17
Pasir Pasang / Beton 0.003 M³ 240,600.00 721.80
Semen warna 0.100 Kg 12,000.00 1,200.00

Pekerja 0.080 Hari / Org 100,000.00 8,000.00


Tukang batu 0.040 Hari / Org 125,000.00 5,000.00
Kepala Tukang 0.004 Hari / Org 150,000.00 600.00
Mandor 0.004 Hari / Org 120,000.00 480.00
25,021.97
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin pc warna ukuran 10 x


40 cm 25,021.97

17 1 m¹ Pasang plint ubin granito ukuran 10 x 40 cm

Tegel Plint granito uk. 10x40 cm 2.650 Bh 34,000.00 90,100.00


Semen PC 1.200 Kg 1,333.47 1,600.17
Pasir Pasang / Beton 0.003 M³ 240,600.00 721.80
Semen warna 0.100 Kg 12,000.00 1,200.00

Pekerja 0.060 Hari / Org 100,000.00 6,000.00


Tukang batu 0.030 Hari / Org 125,000.00 3,750.00
Kepala Tukang 0.003 Hari / Org 150,000.00 450.00

Harga Satuan Dinas PU Manado 2017 Halaman 104 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Mandor 0.003 Hari / Org 120,000.00 360.00


104,181.97
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin granito warna ukuran


10 x 40 cm 104,181.97

18 1 m¹ Pasang plint ubin granito ukuran 10 x 30 cm

Tegel Plint granito uk. 10x30 cm 3.330 Bh 30,000.00 99,900.00


Semen PC 1.650 Kg 1,333.47 2,200.23
Pasir Pasang / Beton 0.003 M³ 240,600.00 769.92
Semen warna 0.100 Kg 12,000.00 1,200.00

Pekerja 0.900 Hari / Org 100,000.00 90,000.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.005 Hari / Org 120,000.00 540.00
207,210.15
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin granito warna ukuran


10 x 30 cm 207,210.15

19 1 m¹ Pasang plint ubin teralux kerang ukuran 10 x 40 cm

Tegel Plint teralux kerang uk. 10x40 cm 2.500 Bh 31,000.00 77,500.00


Semen PC 1.650 Kg 1,333.47 2,200.23
Pasir Pasang / Beton 0.003 M³ 240,600.00 769.92
Semen warna 0.100 Kg 12,000.00 1,200.00

Pekerja 0.900 Hari / Org 100,000.00 90,000.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.005 Hari / Org 120,000.00 540.00
184,810.15
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint teralux kerang warna ukuran


10 x 40 cm 184,810.15

20 1 m¹ Pasang plint ubin teralux kerang ukuran 10 x 30 cm

Tegel Plint teralux kerang uk. 10x30 cm 3.330 Bh 31,000.00 103,230.00


Semen PC 1.650 Kg 1,333.47 2,200.23
Pasir Pasang / Beton 0.003 M³ 240,600.00 769.92
Semen warna 0.100 Kg 12,000.00 1,200.00

Pekerja 0.900 Hari / Org 100,000.00 90,000.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.005 Hari / Org 120,000.00 540.00
210,540.15
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin teralux kerang warna


ukuran 10 x 30 cm 210,540.15

21 1 m¹ Pasang plint ubin teralux marmer ukuran 10 x 60 cm

Tegel Plint teralux marmer uk. 10x60 cm 1.700 Bh 37,500.00 63,750.00


Semen PC 1.650 Kg 1,333.47 2,200.23
Pasir Pasang / Beton 0.003 M³ 240,600.00 769.92
Semen warna 0.100 Kg 12,000.00 1,200.00

Pekerja 0.900 Hari / Org 100,000.00 90,000.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.005 Hari / Org 120,000.00 540.00
171,060.15
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin teralux marmer warna


ukuran 10 x 60 cm 171,060.15

22 1 m¹ Pasang plint ubin teralux marmer ukuran 10 x 40 cm

Tegel Plint teralux marmer uk. 10x40 cm 2.630 Bh 36,000.00 94,680.00


Semen PC 1.650 Kg 1,333.47 2,200.23
Pasir Pasang / Beton 0.003 M³ 240,600.00 769.92
Semen warna 0.100 Kg 12,000.00 1,200.00

Pekerja 0.900 Hari / Org 100,000.00 90,000.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.005 Hari / Org 120,000.00 540.00
201,990.15
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin teralux marmer warna


ukuran 10 x 40 cm 201,990.15

Harga Satuan Dinas PU Manado 2017 Halaman 105 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

23 1 m¹ Pasang plint ubin teralux marmer ukuran 10 x 30 cm

Tegel Plint teralux marmer uk. 10x30 cm 3.330 Bh 35,000.00 116,550.00


Semen PC 1.650 Kg 1,333.47 2,200.23
Pasir Pasang / Beton 0.003 M³ 240,600.00 769.92
Semen warna 0.100 Kg 12,000.00 1,200.00

Pekerja 0.900 Hari / Org 100,000.00 90,000.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.005 Hari / Org 120,000.00 540.00
223,860.15
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint ubin teralux marmer warna


ukuran 10 x 30 cm 223,860.15

24 1 m² Pasang lantai keramik artistik 10 x 20 cm

Ubin keramik arttistik uk. 10 x 20 cm 50.000 Bh 3,000.00 150,000.00


Semen PC 11.380 Kg 1,333.47 15,174.93
Pasir Pasang / Beton 0.042 M³ 240,600.00 10,105.20
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
307,880.13
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai keramik artistik 10 x 20 cm 307,880.13

25 1 m² Pasang lantai keramik artistik 10 x 10 cm

Ubin keramik arttistik uk. 10 x 10 cm 100.000 Bh 3,250.00 325,000.00


Semen PC 11.380 Kg 1,333.47 15,174.93
Pasir Pasang / Beton 0.042 M³ 240,600.00 10,105.20
Semen warna 2.000 Kg 12,000.00 24,000.00

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
488,880.13
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai keramik artistik 10 x 10 cm 488,880.13

26 1 m² Pasang lantai keramik artistik 5 x 20 cm

Ubin keramik arttistik uk. 5 x 20 cm 100.000 Bh 3,000.00 300,000.00


Semen PC 11.380 Kg 1,333.47 15,174.93
Pasir Pasang / Beton 0.042 M³ 240,600.00 10,105.20
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
457,880.13
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai keramik artistik 5 x 20 cm 457,880.13

27 1 m¹ Pasang plint keramik artistik 10 x 20 cm

Ubin keramik arttistik uk. 10 x 20 cm 5.000 Bh 3,000.00 15,000.00


Semen PC 1.650 Kg 1,333.47 2,200.23
Pasir Pasang / Beton 0.003 M³ 240,600.00 769.92
Semen warna 0.100 Kg 12,000.00 1,200.00

Pekerja 0.090 Hari / Org 100,000.00 9,000.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.005 Hari / Org 120,000.00 540.00
41,310.15
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint keramik artistik 5 x 20 cm 41,310.15

28 1 m¹ Pasang plint keramik artistik 10 x 10 cm

Ubin keramik arttistik uk. 10 x 10 cm 10.000 Bh 3,250.00 32,500.00


Semen PC 1.650 Kg 1,333.47 2,200.23
Pasir Pasang / Beton 0.003 M³ 240,600.00 769.92
Semen warna 0.120 Kg 12,000.00 1,440.00

Harga Satuan Dinas PU Manado 2017 Halaman 106 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pekerja 0.090 Hari / Org 100,000.00 9,000.00


Tukang batu 0.090 Hari / Org 125,000.00 11,250.00
Kepala Tukang 0.009 Hari / Org 150,000.00 1,350.00
Mandor 0.005 Hari / Org 120,000.00 540.00
59,050.15
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint keramik artistik 10 x 10 cm 59,050.15

29 1 m¹ Internal cove artistik (5x5x 20) cm

Internal cove artistik (5 x5x20) cm 5.300 Bh 5,905.00 31,296.50


Semen PC 1.415 Kg 1,333.47 1,886.87
Pasir Pasang / Beton 0.039 M³ 240,600.00 9,383.40
Semen warna 1.200 Kg 12,000.00 14,400.00

Pekerja 0.750 Hari / Org 100,000.00 75,000.00


Tukang batu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.038 Hari / Org 120,000.00 4,500.00
199,466.77
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang internal cove artistik 5 x 5 x 20 cm 199,466.77

30 1 m¹ Pasang plint vinyil tanpa adukan

Lt vinyl karet 30x30 kwl l 3.500 M² 85,000.00 297,500.00


Lem vinyil 0.080 Kg 27,500.00 2,200.00

Pekerja 0.080 Hari / Org 100,000.00 8,000.00


Tukang batu 0.080 Hari / Org 125,000.00 10,000.00
Kepala Tukang 0.008 Hari / Org 150,000.00 1,200.00
Mandor 0.004 Hari / Org 120,000.00 480.00
319,380.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m' pasang plint vinyil tanpa adukan 319,380.00

31 1 m² Pasang lantai keramik 15 x 15 cm

Tegel Keramik uk. 15x15 cm 44.000 Bh 1,800.00 79,200.00


Semen PC 11.380 Kg 1,333.47 15,174.93
Pasir Pasang / Beton 0.042 M³ 240,600.00 10,105.20
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
237,080.13
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai keramik 15 x 15 cm 237,080.13

32 1 m² Pasang lantai keramik 20 x 20 cm

Tegel Keramik uk. 20x20 cm 25.000 Bh 2,250.00 56,250.00


Semen PC 11.380 Kg 1,333.47 15,174.93
Pasir Pasang / Beton 0.042 M³ 240,600.00 10,105.20
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
214,130.13
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai keramik 20x20 cm 214,130.13

33 1 m² Pasang lantai keramik 25 x 25 cm

Tegel Keramik uk. 25x25 cm 16.000 Bh 2,500.00 40,000.00


Semen PC 11.380 Kg 1,333.47 15,174.93
Pasir Pasang / Beton 0.042 M³ 240,600.00 10,105.20
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
197,880.13
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai keramik 25x25 cm 197,880.13

Harga Satuan Dinas PU Manado 2017 Halaman 107 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

34 1 m² Pasang lantai keramik 15 x 20 cm

Tegel Keramik uk. 15x20 cm 33.350 Bh 2,000.00 66,700.00


Semen PC 11.380 Kg 1,333.47 15,174.93
Pasir Pasang / Beton 0.042 M³ 240,600.00 10,105.20
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
224,580.13
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai keramik 15x20 cm 224,580.13

35 1 m² Pasang lantai mosaik 30 x 30 cm, ex lokal

Tegel mosaik 30 x 30 cm, ex lokal 11.870 Bh 47,500.00 563,825.00


Semen PC 14.150 Kg 1,333.47 18,868.65
Pasir Pasang / Beton 0.039 M³ 240,600.00 9,383.40
Semen warna 2.000 Kg 12,000.00 24,000.00

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
730,677.05
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai keramik mosaik 30x30 cm,


ex lokal 730,677.05

36 1 m² Pasang lantai marmer

Marmer 1.052 Bh 300,000.00 315,600.00


Semen PC 14.150 Kg 1,333.47 18,868.65
Pasir Pasang / Beton 0.039 M³ 240,600.00 9,383.40
Semen warna 2.000 Kg 12,000.00 24,000.00

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
482,452.05
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai marmer 482,452.05

37 1 m² Pasang lantai karpet 100% wool

Feltex carpet 100% wool T-21 1.050 M² 165,000.00 173,250.00


Lem vinyil 0.350 Kg 27,500.00 9,625.00

Pekerja 0.170 Hari / Org 100,000.00 17,000.00


Tukang batu 0.170 Hari / Org 125,000.00 21,250.00
Kepala Tukang 0.017 Hari / Org 150,000.00 2,550.00
Mandor 0.009 Hari / Org 120,000.00 1,020.00
224,695.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai karpet 100% wool 224,695.00

38 1 m² Pasang lantai karpet 80% wool, 20% nylon

Carpet 80% wool, 20% nylon 1.050 M² 94,500.00 99,225.00


Lem vinyil 0.350 Kg 27,500.00 9,625.00

Pekerja 0.170 Hari / Org 100,000.00 17,000.00


Tukang batu 0.170 Hari / Org 125,000.00 21,250.00
Kepala Tukang 0.017 Hari / Org 150,000.00 2,550.00
Mandor 0.009 Hari / Org 120,000.00 1,020.00
150,670.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai karpet 80% wool, 20%


nylon 150,670.00

39 1 m² Pasang underlyer, tebal 6 mm

Underlyer tebal 6 mm/rubber corrugated 1.050 M² 170,000.00 178,500.00

Pekerja 0.120 Hari / Org 100,000.00 12,000.00


Tukang batu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.006 Hari / Org 120,000.00 720.00
208,020.00
Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2017 Halaman 108 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Biaya Untuk 1 m2 pasang underlyer, tebal 6 mm 208,020.00

40 1 m² Pasang lantai karpet

Carpet 1.050 M² 76,780.00 80,619.00


Lem vinyil 0.350 Kg 27,500.00 9,625.00

Pekerja 0.170 Hari / Org 100,000.00 17,000.00


Tukang batu 0.170 Hari / Org 125,000.00 21,250.00
Kepala Tukang 0.017 Hari / Org 150,000.00 2,550.00
Mandor 0.009 Hari / Org 120,000.00 1,020.00
132,064.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai karpet 132,064.00

41 1 m² Pasang lantai parquet jati

Parquet jati 1.050 M² 180,000.00 189,000.00


Lem vinyil 0.600 Kg 27,500.00 16,500.00

Pekerja 0.650 Hari / Org 100,000.00 65,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.033 Hari / Org 120,000.00 3,900.00
323,400.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai parquet jati 323,400.00

42 1 m² Pasang gymfloor

Gymfloor 1.050 M² 120,000.00 126,000.00


Lem vinyil 0.600 Kg 27,500.00 16,500.00

Pekerja 0.650 Hari / Org 100,000.00 65,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.033 Hari / Org 120,000.00 3,900.00
260,400.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang gymfloor 260,400.00

43 1 m² Pasang dinding porselin 11 x 11 cm, putih

Tegel Keramik uk. 11x11 cm 83.000 Bh 1,100.00 91,300.00


Semen pc 9.300 Kg 1,333.47 12,401.31
Pasir Pasang / Beton 0.018 M³ 240,600.00 4,330.80

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.500 Hari / Org 125,000.00 62,500.00
Kepala Tukang 0.050 Hari / Org 150,000.00 7,500.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
243,632.11
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang dinding porselin 11 x 11 cm, putih 243,632.11

44 1 m² Pasang dinding keramik artistik 10 x 20 cm

Ubin keramik arttistik uk. 10 x 20 cm 50.000 Bh 3,000.00 150,000.00


Semen pc 9.300 Kg 1,333.47 12,401.31
Pasir Pasang / Beton 0.018 M³ 240,600.00 4,330.80
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
311,332.11
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang dinding keramik artistik 10 x 20


cm, warna 311,332.11

45 1 m² Pasang dinding keramik artistik 5 x 20 cm

Ubin keramik arttistik uk. 5 x 20 cm 100.000 Bh 3,000.00 300,000.00


Semen pc 9.300 Kg 1,333.47 12,401.31
Pasir Pasang / Beton 0.018 M³ 240,600.00 4,330.80
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
461,332.11
Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2017 Halaman 109 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Biaya Untuk 1 m2 pasang dinding keramik artistik 5 x 20 cm 461,332.11

46 1 m² Pasang dinding keramik 10 x 20 cm

Tegel Keramik uk. 10x20 cm 50.000 Bh 1,250.00 62,500.00


Semen pc 9.300 Kg 1,333.47 12,401.31
Pasir Pasang / Beton 0.018 M³ 240,600.00 4,330.80
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
223,832.11
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang dinding keramik 10 x 20 cm 223,832.11

47 1 m² Pasang dinding keramik 15 x 15 cm

Tegel Keramik uk. 15x15 cm 45.000 Bh 1,800.00 81,000.00


Semen pc 9.300 Kg 1,333.47 12,401.31
Pasir Pasang / Beton 0.018 M³ 240,600.00 4,330.80
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 0.450 Hari / Org 125,000.00 56,250.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
242,332.11
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang dinding keramik artistik 15 x 15


cm 242,332.11

48 1 m² Pasang dinding keramik 20 x 20 cm

Tegel Keramik uk. 20x20 cm 25.000 Bh 2,250.00 56,250.00


Semen pc 9.300 Kg 1,333.47 12,401.31
Pasir Pasang / Beton 0.018 M³ 240,600.00 4,330.80
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 0.100 Hari / Org 125,000.00 12,500.00
Kepala Tukang 0.045 Hari / Org 150,000.00 6,750.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
173,832.11
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang dinding keramik 20 x 20 cm 173,832.11

49 1 m² Pasang dinding keramik 10 x 20 cm

Tegel Keramik uk. 10x20 cm 50.000 Bh 1,250.00 62,500.00


Semen pc 9.300 Kg 1,333.47 12,401.31
Pasir Pasang / Beton 0.018 M³ 240,600.00 4,330.80
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.600 Hari / Org 100,000.00 60,000.00


Tukang batu 0.125 Hari / Org 125,000.00 15,625.00
Kepala Tukang 0.013 Hari / Org 150,000.00 1,875.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
178,332.11
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang dinding keramik 10 x 20 cm 178,332.11

50 1 m² Pasang dinding marmer

Marmer 1.020 Bh 300,000.00 306,000.00


Paku pancing 2.000 Kg 20,000.00 40,000.00
Semen pc 12.440 Kg 1,333.47 16,588.41
Pasir Pasang / Beton 0.025 M³ 240,600.00 6,015.00
Semen warna 1.500 Kg 12,000.00 18,000.00

Pekerja 0.720 Hari / Org 100,000.00 72,000.00


Tukang batu 0.650 Hari / Org 125,000.00 81,250.00
Kepala Tukang 0.065 Hari / Org 150,000.00 9,750.00
Mandor 0.035 Hari / Org 120,000.00 4,200.00
553,803.41
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang dinding marmer 553,803.41

51 1 m² Pasang dinding bata pelapis 7x3x24 cm

Bata Merah 60.000 Bh 850.00 51,000.00


Semen pc 12.440 Kg 1,333.47 16,588.41
Pasir Pasang / Beton 0.025 M³ 240,600.00 6,015.00

Harga Satuan Dinas PU Manado 2017 Halaman 110 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pekerja 0.650 Hari / Org 100,000.00 65,000.00


Tukang batu 0.500 Hari / Org 125,000.00 62,500.00
Kepala Tukang 0.050 Hari / Org 150,000.00 7,500.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
212,203.41
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang dinding bata pelapis 7x3x24 cm 212,203.41

52 1 m² Pasang dinding bata klinker 5x5x25 cm

Batu Bata Klinker Uk. 5 x 5 x 25 80.000 Bh 1,780.00 142,400.00


Semen pc 12.440 Kg 1,333.47 16,588.41
Pasir Pasang / Beton 0.025 M³ 240,600.00 6,015.00

Pekerja 0.620 Hari / Org 100,000.00 62,000.00


Tukang batu 0.350 Hari / Org 125,000.00 43,750.00
Kepala Tukang 0.350 Hari / Org 150,000.00 52,500.00
Mandor 0.030 Hari / Org 120,000.00 3,600.00
326,853.41
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang dinding bata klinker 5x5x25 cm 326,853.41

53 1 m² Pasang lantai vinyl karet 30 x 30 cm KL I

Lt vinyl karet 30x30 kwl l 11.050 M² 85,000.00 939,250.00


Lem vinyil 0.350 Kg 27,500.00 9,625.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.008 Hari / Org 120,000.00 900.00
985,775.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai vinyl karet 30 x 30 cm KL I 985,775.00

54 1 m² Pasang lantai vinyl karet 30 x 30 cm KL II

Lt vinyl karet 30x30 kwl II 11.050 M² 85,000.00 939,250.00


Lem vinyil 0.350 Kg 27,500.00 9,625.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.008 Hari / Org 120,000.00 900.00
985,775.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai vinyl karet 30 x 30 cm KL II 985,775.00

55 1 m² Pasang lantai vinyl asbes 30 x 30 cm

Vinyil asbes 11.050 Bh 12,500.00 138,125.00


Lem vinyil 0.350 Kg 27,500.00 9,625.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.008 Hari / Org 120,000.00 900.00
184,650.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai vinyl asbes 30 x 30 cm 184,650.00

56 1 m² Pasang lantai vinyl motif kembang 30 x 30 cm

Vinyil motif kembang Ex DN 11.050 Bh 17,500.00 193,375.00


Lem vinyil 0.350 Kg 27,500.00 9,625.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang batu 0.150 Hari / Org 125,000.00 18,750.00
Kepala Tukang 0.015 Hari / Org 150,000.00 2,250.00
Mandor 0.008 Hari / Org 120,000.00 900.00
239,900.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai vinyl motif kembang 30 x


30 cm 239,900.00

57 1 m² Pasang wall covering lebar 50 cm

Vinyil wall covering lebar 50 cm 1.100 M² 100,000.00 110,000.00


Lem vinyil 0.250 Kg 27,500.00 6,875.00

Harga Satuan Dinas PU Manado 2017 Halaman 111 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Pekerja 0.750 Hari / Org 100,000.00 75,000.00


Tukang batu 0.170 Hari / Org 125,000.00 21,250.00
Kepala Tukang 0.017 Hari / Org 150,000.00 2,550.00
Mandor 0.009 Hari / Org 120,000.00 1,020.00
216,695.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang lantai vinyl wall covering 216,695.00

58 1 m² Floor hardener ferrovax

Floor hardener 3.000 Kg 27,500.00 82,500.00

Pekerja 0.120 Hari / Org 100,000.00 12,000.00


Tukang batu 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.006 Hari / Org 120,000.00 720.00
112,020.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 floor hardener ferrovax 112,020.00

XIII. PEKERJAAN PENGECATAN

1. 1 m² Mengikis/mengerok permukaan cat tembok lama

Soda api 0.050 Kg 10,000.00 500.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang cat Hari / Org 125,000.00 -
Kepala Tukang Hari / Org 150,000.00 -
Mandor 0.003 Hari / Org 120,000.00 300.00
15,800.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 mengikis cat tembok lama 15,800.00

2 1 m² Mencuci bidang permukaan tembok yang pernah di cat

Sabun 0.050 Kg 17,720.00 886.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang cat Hari / Org 125,000.00 -
Kepala Tukang Hari / Org 150,000.00 -
Mandor 0.003 Hari / Org 120,000.00 300.00
16,186.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 mencuci permukaan tembok yang pernah


di cat 16,186.00

3 1 m² Mengerok karat cat lama permukaan baja dengan cara


manual

Sabun 0.050 Kg 17,720.00 886.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang cat Hari / Org 125,000.00 -
Kepala Tukang Hari / Org 150,000.00 -
Mandor 0.003 Hari / Org 120,000.00 300.00
16,186.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 mengerok cat lama permukaan baja 16,186.00

4 1 m² Menyabun permukaan tembok lama

Sabun 0.050 Kg 17,720.00 886.00

Pekerja 0.150 Hari / Org 100,000.00 15,000.00


Tukang cat Hari / Org 125,000.00 -
Kepala Tukang Hari / Org 150,000.00 -
Mandor 0.003 Hari / Org 120,000.00 300.00
16,186.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 menyabun permukaan tembok lama 16,186.00

5 1 m² Mendempul dan menggosok kayu

Dempul Kayu/Wood Filler (Impra Setara) 0.080 Kg 40,000.00 3,200.00


Minyak Cat / Thiner 0.020 Ltr 25,000.00 500.00
Batu apung 0.010 Kg 7,090.00 70.90

Pekerja 0.040 Hari / Org 100,000.00 4,000.00


Tukang cat 0.040 Hari / Org 125,000.00 5,000.00
Kepala Tukang 0.004 Hari / Org 150,000.00 600.00

Harga Satuan Dinas PU Manado 2017 Halaman 112 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Mandor 0.003 Hari / Org 120,000.00 300.00


13,670.90
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 mendempul dan menggosok kayu 13,670.90

6 1 m² Plamur

Plamir 0.200 Kg 50,000.00 10,000.00


Ampelas 0.100 Lbr 5,000.00 500.00

Pekerja 0.002 Hari / Org 100,000.00 150.00


Tukang cat 0.015 Hari / Org 125,000.00 1,875.00
Kepala Tukang 0.030 Hari / Org 150,000.00 4,500.00
Mandor 0.002 Hari / Org 120,000.00 180.00
17,205.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 Plamur 17,205.00

7 1 m² Plamur permukaan gypsum

Paper tape 1.100 M¹ 1,000.00 1,100.00


Compound gypsum 0.100 Kg 10,000.00 1,000.00

Pekerja 0.005 Hari / Org 100,000.00 500.00


Tukang 0.050 Hari / Org 125,000.00 6,250.00
Kepala Tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.001 Hari / Org 120,000.00 150.00
12,750.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 Plamur permukaan gypsum 12,750.00

8 1 m² Cat dinding dalam & cat plafon (Cat Setara Dulux)

Cat Tembok (Dulux/ICI setara) 0.375 Kg 64,000.00 24,000.00


Ampelas 0.100 Lbr 5,000.00 500.00
Kuas 0.050 Bh 20,000.00 1,000.00

Pekerja 0.080 Hari / Org 100,000.00 8,000.00


Tukang cat 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.012 Hari / Org 120,000.00 1,440.00
51,740.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 Cat dinding dalam & cat plafon 51,740.00

9 1 m² Cat dinding luar & cat dinding / plafon KM (Cat Setara


Dulux)

Cat Tembok (Dulux/ICI setara) 0.375 Kg 64,000.00 24,000.00


Cat Dasar /Alkali (Dulux/ Setara) 0.150 Kg 50,000.00 7,500.00
Ampelas 0.100 Lbr 5,000.00 500.00
Kuas 0.050 Bh 20,000.00 1,000.00

Pekerja 0.080 Hari / Org 100,000.00 8,000.00


Tukang cat 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.012 Hari / Org 120,000.00 1,440.00
59,240.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 Cat dinding luar & cat dinding / plafon


KM 59,240.00

10 1 m² Cat dinding dalam & cat plafon (Cat Setara


Metrolite/Catylac)

Cat Tembok (Metrolite/ Catylac/ Setara) 0.375 Kg 23,000.00 8,625.00


Ampelas 0.100 Lbr 5,000.00 500.00
Kuas 0.050 Bh 20,000.00 1,000.00

Pekerja 0.080 Hari / Org 100,000.00 8,000.00


Tukang cat 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.012 Hari / Org 120,000.00 1,440.00
36,365.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 Cat dinding dalam & cat plafon 36,365.00

11 1 m² Cat dinding luar & cat dinding / plafon KM (Cat Setara


Metrolite/Catylac)

Cat Tembok (Metrolite/ Catylac/ Setara) 0.375 Kg 23,000.00 8,625.00


Cat Dasar /Alkali (Dulux/ Setara) 0.150 Kg 50,000.00 7,500.00
Ampelas 0.100 Lbr 5,000.00 500.00
Kuas 0.050 Bh 20,000.00 1,000.00

Pekerja 0.080 Hari / Org 100,000.00 8,000.00


Tukang cat 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.012 Hari / Org 120,000.00 1,440.00
43,865.00
Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2017 Halaman 113 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Biaya Untuk 1 m2 Cat dinding luar & cat dinding / plafon


KM 43,865.00

12 1 m² Cat tembok / plafon ( Rehab ) (Cat Setara


Metrolite/Catylac)

Cat Tembok (Metrolite/ Catylac/ Setara) 0.273 Kg 23,000.00 6,286.67


Plamir 0.025 Kg 50,000.00 1,250.00
Ampelas 0.100 Lbr 5,000.00 500.00
Kuas 0.050 Bh 20,000.00 1,000.00

Pekerja 0.080 Hari / Org 100,000.00 8,000.00


Tukang cat 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.080 Hari / Org 120,000.00 9,600.00
43,436.67
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 Cat tembok / plafon ( Rehab ) 43,436.67

13 1 m² Cat minyak ( Setara Glotex/ Seiv)

Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) 0.300 Kg 65,000.00 19,500.00


Dempul Kayu/Wood Filler (Impra Setara) 0.100 Kg 40,000.00 4,000.00
Ampelas 0.100 Lbr 5,000.00 500.00
Minyak Cat / Thiner 0.125 Ltr 25,000.00 3,125.00
Kuas 0.050 Bh 20,000.00 1,000.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang cat 0.375 Hari / Org 125,000.00 46,875.00
Kepala Tukang 0.038 Hari / Org 150,000.00 5,625.00
Mandor 0.013 Hari / Org 120,000.00 1,500.00
107,125.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 Cat minyak 107,125.00

14 1 m² Cat minyak (rehab) ( Setara Glotex/ Seiv)

Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) 0.200 Kg 65,000.00 13,000.00


Dempul Kayu/Wood Filler (Impra Setara) 0.040 Kg 40,000.00 1,600.00
Ampelas 0.100 Lbr 5,000.00 500.00
Minyak Cat / Thiner 0.070 Ltr 25,000.00 1,750.00
Kuas 0.050 Bh 20,000.00 1,000.00

Pekerja 0.110 Hari / Org 100,000.00 11,000.00


Tukang cat 0.180 Hari / Org 125,000.00 22,500.00
Kepala Tukang 0.018 Hari / Org 150,000.00 2,700.00
Mandor 0.009 Hari / Org 120,000.00 1,080.00
55,130.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 Cat minyak 55,130.00

Harga Satuan Dinas PU Manado 2017 Halaman 114 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

15 1 m² Cat kayu woodstain

Politur 0.250 Ltr 55,000.00 13,750.00


Dempul Kayu/Wood Filler (Impra Setara) 0.100 Kg 40,000.00 4,000.00
Ampelas 0.100 Lbr 5,000.00 500.00
Minyak Cat / Thiner 0.125 Ltr 25,000.00 3,125.00
Kuas 0.050 Bh 20,000.00 1,000.00

Kepala tukang 0.035 Hari / Org 150,000.00 5,250.00


Tukang 0.350 Hari / Org 125,000.00 43,750.00
Pekerja 0.175 Hari / Org 100,000.00 17,500.00
Mandor 0.009 Hari / Org 120,000.00 1,080.00
89,955.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 kayu woodstain 89,955.00

16 1 m² Pelaburan bidang kayu dengan politur

Politur 0.250 Ltr 55,000.00 13,750.00


Minyak Cat / Thiner 0.125 Ltr 25,000.00 3,125.00
Kuas 0.050 Bh 20,000.00 1,000.00

Pekerja 0.060 Hari / Org 100,000.00 6,000.00


Tukang cat 0.120 Hari / Org 125,000.00 15,000.00
Kepala Tukang 0.035 Hari / Org 150,000.00 5,250.00
Mandor 0.009 Hari / Org 120,000.00 1,080.00
45,205.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pelaburan bidang kayu dengan politur 45,205.00

17 1 m² Pengecatan bidang kayu dengan cat residu dan ter

Residu 0.350 Lt 32,500.00 11,375.00

Pekerja 0.100 Hari / Org 100,000.00 10,000.00


Tukang cat Hari / Org 125,000.00 -
Kepala Tukang Hari / Org 150,000.00 -
Mandor 0.006 Hari / Org 120,000.00 720.00
22,095.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pelaburan bidang kayu dengan cat residu 22,095.00

18 1 m² Pelaburan bidang kayu dengan vernis

Teak oil 0.150 Ltr 28,250.00 4,237.50


Dempul Kayu/Wood Filler (Impra Setara) 0.050 Kg 40,000.00 2,000.00
Ampelas 0.100 Lbr 5,000.00 500.00
Kuas 0.010 Bh 20,000.00 200.00

Pekerja 0.160 Hari / Org 100,000.00 16,000.00


Tukang cat 0.160 Hari / Org 125,000.00 20,000.00
Kepala Tukang 0.016 Hari / Org 150,000.00 2,400.00
Mandor 0.003 Hari / Org 120,000.00 300.00
45,637.50
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pelaburan bidang kayu dengan vernis 45,637.50

Harga Satuan Dinas PU Manado 2017 Halaman 115 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

19 1 m² Pemasangan wall paper

Wallpaper 1.200 M² 115,000.00 138,000.00


Lem vinyil 0.200 Kg 27,500.00 5,500.00

Pekerja 0.020 Hari / Org 100,000.00 2,000.00


Tukang cat 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.002 Hari / Org 150,000.00 300.00
Mandor 0.003 Hari / Org 120,000.00 300.00
171,100.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pemasangan wall paper 171,100.00

20 1 m² Pengecatan permukaan baja dengan meni besi

Cat Menie Kayu/Besi/Seng (Glotex Setara) 0.100 Kg 40,000.00 4,000.00


Kuas 0.010 Bh 20,000.00 200.00

Pekerja 0.028 Hari / Org 100,000.00 2,800.00


Tukang cat 0.200 Hari / Org 125,000.00 25,000.00
Kepala Tukang 0.020 Hari / Org 150,000.00 3,000.00
Mandor 0.010 Hari / Org 120,000.00 1,200.00
36,200.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2pengecatan permukaan baja dengan


meni besi 36,200.00

21 1 m² Pengecatan permukaan baja dengan meni besi dan


perancah

Cat Menie Kayu/Besi/Seng (Glotex Setara) 0.100 Kg 40,000.00 4,000.00


Kuas 0.010 Bh 20,000.00 200.00
Perancah kayu 0.002 M³ 2,000,000.00 4,000.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang cat 0.225 Hari / Org 125,000.00 28,125.00
Kepala Tukang 0.023 Hari / Org 150,000.00 3,375.00
Mandor 0.008 Hari / Org 120,000.00 900.00
61,600.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pengecatan permukaan baja dengan


meni besi dan perancah 61,600.00

22 1 m² Pengecatan permukaan baja lapis seng (galbani) secara


manual sistem 4 lapis cat konvensional

Cat Menie Kayu/Besi/Seng (Glotex Setara) 0.300 Kg 40,000.00 12,000.00

Pekerja 0.006 Hari / Org 100,000.00 600.00


Tukang cat 0.060 Hari / Org 125,000.00 7,500.00
Kepala Tukang 0.012 Hari / Org 150,000.00 1,800.00
Mandor 0.006 Hari / Org 120,000.00 720.00
22,620.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 22,620.00

Pengecatan permukaan baja lapis seng (galbani) secara


23 1 m² semprot (airless spray) dengan sistem 1 lapis cat mutakhir
dengan tebal 200 µm

Cat Menie Kayu/Besi/Seng (Glotex Setara) 0.300 Kg 40,000.00 12,000.00

Pekerja 0.024 Hari / Org 100,000.00 2,400.00


Tukang cat 0.012 Hari / Org 125,000.00 1,500.00
Kepala Tukang - Hari / Org 150,000.00 -
Mandor - Hari / Org 120,000.00 -
15,900.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 15,900.00

24 1 m²
Pemasangan 1 m2 paving block natural tebal 6 cm

Paving Stone t=6 cm 1.010 M2 3,500.00 3,535.00


Pasir Pasang / Beton 0.050 M3 240,600.00 12,030.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang Kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.003 Hari / Org 120,000.00 300.00
75,865.00
Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2017 Halaman 116 dari 127 halaman
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KOEFISIEN SATUAN (Rp.) (Rp.)

Biaya Untuk 1 m2 75,865.00

25 1 m²
Pemasangan 1 m2 paving block natural tebal 8 cm

Paving Stone t=8 cm 1.010 M2 4,000.00 4,040.00


Pasir Pasang / Beton 0.070 M3 240,600.00 16,842.00

Pekerja 0.250 Hari / Org 100,000.00 25,000.00


Tukang Kayu 0.250 Hari / Org 125,000.00 31,250.00
Kepala tukang 0.025 Hari / Org 150,000.00 3,750.00
Mandor 0.003 Hari / Org 120,000.00 300.00
81,182.00
Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 81,182.00

Catatan :
- Sesuai harga yang berlaku dipasaran.
- Harga satuan belum termasuk pajak yang berlaku.
- Harga sewaktu-waktu bisa berubah

Harga Satuan Dinas PU Manado 2017 Halaman 117 dari 127 halaman
Daftar Besi (Baja) Polos Beton

Diameter Berat per m' Panjang di Berat Total Harga di Harga per
pasaran pasaran Kg. Ket.
(mm) **(kg/m') ( m' ) (kg) (Rp.) (Rp.)

BESI BETON POLOS

6 0.220 11.5 2.5300 SII

6 0.220 11.9 2.6180 30,000.00 11,459.13 SNI

8 0.393 11.5 4.5195 SII

8 0.393 12.0 4.7160 SNI

10 0.620 11.5 7.1300 SII

10 0.620 12.0 7.4400 65,000.00 8,736.56 SNI

12 0.887 11.5 10.2005 SII

12 0.887 12.0 10.6440 105,000.00 9,864.71 SNI

14 1.209 11.5 13.9035 SII

14 1.209 12.0 14.5080 135,000.00 9,305.21 SNI

16 1.580 12.0 18.9600 SII

16 1.580 12.0 18.9600 175,000.00 9,229.96 SNI


Harga Tertinggi 11,459.13
BESI BETON ULIR

14 1.209 12.0 14.5080 SNI

14 1.209 12.0 14.5080 135,000.00 9,305.21 SNI


16 1.580 12.0 18.9600 SNI

16 1.580 12.0 18.9600 175,000.00 9,229.96 SNI

19 1.994 12.0 23.9280 SNI

19 1.994 12.0 23.9280 237,000.00 9,904.71 SNI

20 2.465 12.0 29.5800 SNI

20 2.465 12.0 29.5800 Tdk Ada Data SNI

22 2.980 12.0 35.7600 SNI

22 2.980 12.0 35.7600 331,250.00 9,263.14 SNI

25 3.850 12.0 46.2000 SNI

25 3.850 12.0 46.2000 Tdk Ada Data SNI


Harga Rata rata 9,904.71

** Sumber : Buku Teknik Sipil, hal. 352


DAFTAR HARGA SATUAN JADI
PRASARANA PERUMAHAN DAN PERMUKIMAN

HARGA
NO. URAIAN PEKERJAAN SATUAN KETERANGAN
(Rp.)

1 Pagar sementara dari kayu tinggi 2 meter 1 m¹ 370,889.58


2 Pagar sementara dari seng gelombang tinggi 2 meter 1 m¹ 453,889.58
3 Pagar sementara dari kawat duri tinggi 1.8 meter 1 m¹ 1,589,847.85
4 Pengukuran dan Pemasangan Bouwplank 1 m¹ 80,960.00
5 Pembuatan kantor sementara, dengan lantai plesteran 1 m² 4,258,276.58
6 Pembuatan gudang semen dan alat-alat 1 m² 1,257,824.47
7 Pembuatan rumah jaga/konstruksi kayu 1 m² 1,416,100.00
8 Membersihkan lapangan dan perataan 1 m² 16,000.00
9 Pembuatan bedeng buruh 1 m² 1,288,900.53
10 Pembuatan bak adukan ukuran (40 x 50 x 20) cm 1 m² 192,620.00
11 Pembuatan Stegger dari bambu, ukuran (40 x 50 x 20) cm 1 m² 56,735.00
12 Pembuatan jalan sementara 1 m² 194,180.20
13 Bongkaran beton bertulang 1 m³ 777,326.00
14 Bongkaran dinding tembok bata merah 1 m³ 706,660.00
15 Pasang pagar kawat jaring galvanis, tinggi 1.00 m 1 m¹ 27,650.00
16 Galian tanah biasa sedalam 1 meter 1 m³ 78,000.00
17 Galian tanah biasa sedalam 2 meter 1 m³ 95,400.00
18 Galian tanah biasa sedalam 3 meter 1 m³ 113,040.00
19 Galian tanah keras sedalam 1 meter 1 m³ 103,840.00
20 Galian tanah cadas sedalam 1 meter 1 m³ 157,200.00
21 Galian tanah lumpur sedalam 1 meter 1 m³ 125,400.00
22 Pekerjaan stripping setinggi 1 meter 1 m² 5,600.00
23 Pembuangan tanah sejauh 30 meter 1 m³ 34,200.00
24 Urugan kembali 1 m³ 26,000.00
25 Pemadatan tanah (per 20 cm) 1 m³ 56,000.00
26 Timbunan tanah dan pemadatan ( manual ) 1 m³ 115,680.00
27 Urugan pasir 1 m³ 93,600.00
28 Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL 1 m³ 240,955.14
29 Lapisan pudel campuran 1 Kp : 5 TL 1 m³ 260,262.00
30 Pemasangan lapisan ijuk 1 m³ 256,800.00
31 Urugan sirtu 1 m³ 298,000.00
32 Pembuatan jalan sementara, tebal 25 cm 1 m² 205,835.45
33 Pasang pondasi batu kali, 1 Pc : 3 Ps 1 m³ 1,005,492.70
34 Pasang pondasi batu kali, 1 Pc : 4 Ps 1 m³ 961,908.22
35 Pasang pondasi batu kali, 1 Pc : 5 Ps 1 m³ 931,678.83
36 Pasang pondasi batu kali, 1 Pc : 6 Ps 1 m³ 859,813.03
37 Pasang pondasi batu kali, 1 Pc : 8 Ps 1 m³ 825,142.71
38 Pasang pondasi batu kali, 1 Kp : 1 Sm : 2 Ps 1 m³ 694,392.20
39 Pasang pondasi batu kali, 1 Pc : 1/4 Kp : 4 Ps 1 m³ 925,207.03
40 Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps 1 m³ 804,619.72
41 Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps 1 m³ 781,481.48
42 Pasang pondasi batu kosong 1 m³ 596,659.20
43 Pasang pond. siklop, 60 % beton campuran 1PC : 2 PB : 3 Kr dan 40% batu belah 1 m³ 2,546,545.51
44 Pasang pondasi sumuran diameter 100 cm 1 m³ 989,221.91
45 Pembuatan tiang pancang (40 x 40) cm, beton bertulang 1 m¹ 1,020,759.56
46 Pembuatan tiang pancang (35 x 35) cm, beton bertulang 1 m¹ 802,882.71
47 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps 1 m² 512,854.11
48 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps 1 m² 501,432.56
49 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps 1 m² 268,379.53
50 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps 1 m² 264,744.32
51 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps 1 m² 259,858.58
52 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps 1 m² 253,047.07
53 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps 1 m² 139,712.13
54 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 1 m² 134,086.02
55 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps 1 m² 130,980.75
56 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps 1 m² 129,035.03
57 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps 1 m² 128,183.90
58 Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps 1 m² 125,997.58
59 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps 1 m² 127,012.53
60 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps 1 m² 114,265.08
61 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps 1 m² 115,641.24

SATUAN JADI 2016 Halaman 119 dari 127 halaman


HARGA
NO. URAIAN PEKERJAAN SATUAN KETERANGAN
(Rp.)
62 Plesteran 1 Pc : 1 Ps, tebal 15 mm 1 m² 77,323.78
63 Plesteran 1 Pc : 2 Ps, tebal 15 mm 1 m² 71,245.44
64 Plesteran 1 Pc : 3 Ps, tebal 15 mm 1 m² 68,702.89
65 Plesteran 1 Pc : 4 Ps, tebal 15 mm 1 m² 66,895.28
66 Plesteran 1 Pc : 5 Ps, tebal 15 mm 1 m² 65,968.33
67 Plesteran 1 Pc : 6 Ps, tebal 15 mm 1 m² 65,184.82
68 Plesteran 1 Pc : 2 Ps ; tebal 20 mm 1 m² 95,314.11
69 Plesteran 1 Pc : 3 Ps ; tebal 20 mm 1 m² 90,844.06
70 Plesteran 1 Pc : 4 Ps ; tebal 20 mm 1 m² 89,433.70
71 Plesteran 1 Pc : 5 Ps ; tebal 20 mm 1 m² 88,277.97
72 Plesteran Skoning 1 PC : 2 PP, lebar 10 mm 1 m² 68,274.54
73 Plesteran siar timbul adukan 1 Pc : 2 Ps 1 m² 64,141.42
74 Acian 1 m² 39,533.79
75 Acian Untuk Saluran 1 m² 20,410.21
76 Membuat dan memasang kosen pintu, jendela, ventilasi, kayu Kls.I 1 m³ 13,089,500.00
77 Membuat dan memasang kosen pintu, jendela, ventilasi, kayu Kls.II 1 m³ 9,213,500.00
78 Mermbuat dan memasang Pintu klamp standar, rangka kayu kelas II 1 m² 385,060.00
79 Mermbuat dan memasang Pintu klamp sederhana, rangka kayu kelas III 1 m² 325,060.00
80 Membuat dan memasang pintu panel kayu kelas I 1 m² 883,500.00
81 Membuat dan memasang pintu panel kayu kelas II 1 m² 743,500.00
82 Membuat dan memasang pintu dan jendela kaca kayu kelas I 1 m² 635,300.00
83 Membuat dan memasang pintu dan jendela kaca kayu kelas II 1 m² 551,300.00
84 Membuat dan memasang pintu dan jendela jalusi kayu kayu kelas I 1 m² 1,087,500.00
85 Membuat dan memasang pintu dan jendela jalusi kayu kayu kelas II 1 m² 863,500.00
86 Pasang pintu plywood rangkap,rangka kayu kelas I (lebar sampai 90 cm) 1 m² 683,740.00
87 Memasang jalusi kusen, kayu kelas I 1 m² 899,900.00
88 Memasang jalusi kusen, kayu kelas II 1 m² 689,900.00
89 Pasang pintu plywood rangkap, rangka kayu kelas II (lebar sampai 90 cm) 1 m² 596,240.00
90 Pasang pintu plywood rangkap, rangka expose kayu kelas I 1 m² 722,340.00
91 Pasang pintu plywood rangkap, rangka expose kayu kelas II 1 m² 651,840.00
92 Pasang pintu teakwood rangkap, rangka kayu kelas I 1 m² 778,740.00
93 Pasang pintu teakwood rangkap, rangka kayu kelas II 1 m² 691,240.00
94 Pasang pintu teakwood rangkap, rangka expose kayu kelas I 1 m² 824,340.00
95 Pasang pintu teakwood rangkap, rangka expose kayu kelas II 1 m² 736,840.00
96 Pasang pintu teakwood rangkap & formika rangka expose kayu kelas I 1 m² 876,840.00
97 Pasang pintu teakwood rangkap & formika rangka expose kayu kelas II 1 m² 789,340.00
98 Pasang konstruksi kuda-kuda kayu jati 1 m³ 12,874,800.00
99 Pasang konstruksi kuda-kuda kayu kelas I 1 m³ 12,874,800.00
100 Pasang konstruksi kuda-kuda kayu kelas II 1 m³ 9,024,800.00
101 Pasang konstruksi kuda-kuda kayu kelas III 1 m³ 7,374,800.00
102 Pasang kaso + reng genteng kodok kayu kelas I 1 m² 129,300.00
103 Pasang kaso + reng genteng kodok kayu kelas II 1 m² 87,300.00
104 Pasang kaso + reng genteng monier kayu jati 1 m² 146,300.00
105 Pasang kaso + reng genteng monier kayu kelas I 1 m² 146,300.00
106 Pasang kaso + reng genteng beton kayu kelas II 1 m² 97,300.00
107 Pasang kaso + reng atap sirap kayu kelas I 1 m² 1,435,620.00
108 Pasang kaso + reng atap sirap kayu kelas II 1 m² 858,120.00
109 Pasang rangka langit-langit (1,00 x 1,00) m, kayu jati 1 m² 162,800.00
110 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kelas I 1 m² 162,800.00
111 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kelas II 1 m² 120,800.00
112 Pasang rangka langit-langit (30 x 60) cm, kayu jati 1 m² 261,400.00
113 Pasang Rangka langit-langit 50 x 100 cm, kayu kelas II 1 m² 146,600.00
114 Pasang Rangka langit-langit 50 x 100 cm, kayu kelas III 1 m² 123,500.00
115 Pasang Rangka plafon 60 x 60 cm, kayu kls II 1 m² 149,200.00
116 Pasang Rangka plafon 60 x 60 cm, kayu kls III 1 m² 124,750.00
117 Pasang rangka langit-langit (30 x 30) cm, kayu kelas II 1 m² 214,100.00
118 Pasang lisplang ukuran (3 x 20) cm, kayu kelas I 1 m¹ 132,200.00
119 Pasang lisplang ukuran (3 x 20) cm, kayu kelas II 1 m¹ 94,400.00
120 Pasang lisplang ukuran (3 x 30) cm, kayu kelas I 1 m¹ 133,000.00
121 Pasang lisplang ukuran (3 x 30) cm, kayu kelas II 1 m¹ 94,500.00
122 Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kelas I 1 m¹ 183,330.00
123 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kelas I 1 m¹ 104,180.00
124 Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kelas II 1 m¹ 75,080.00
125 Pasang Rangka dinding pemisah (60x120) cm kayu kls. I 1 m² 319,660.00
126 Pasang Rangka dinding pemisah (60x120) cm kayu kls. II 1 m² 221,660.00
127 Pasang Rangka dinding pemisah (60x120) cm kayu kls. III 1 m² 179,660.00
128 Pasang dinding pemisah teakwood rangkap, rangka kayu kelas I 1 m² 502,100.00
129 Pasang dinding pemisah teakwood rangkap, rangka kayu kelas II 1 m² 404,100.00
130 Pasang dinding pemisah plywood rangkap, rangka kayu kelas I 1 m² 438,600.00
131 Pasang dinding pemisah plywood rangkap, rangka kayu kelas II 1 m² 340,600.00

SATUAN JADI 2016 Halaman 120 dari 127 halaman


HARGA
NO. URAIAN PEKERJAAN SATUAN KETERANGAN
(Rp.)
132 Pasang Dinding pemisah gypsum rangkap, rangka kayu kls. II 1 m² 292,860.00
133 Pasang Dinding lambrisering dari papan kayu kls. II 1 m² 360,650.00
134 Pasang list plafond kayu profil 3/8 1 m¹ 19,845.00
135 Beton mutu f'c = 7,4 Mpa (K 100), slump (12 +/ 2) cm, w/c 0,87 1 m³ 967,055.87
136 Beton mutu f'c = 9,8 Mpa (K 125), slump (12 +/ 2) cm, w/c 0,78 1 m³ 1,005,823.10
137 Beton mutu f'c = 12,2 Mpa (K 150), slump (12 +/ 2) cm, w/c 0,72 1 m³ 1,032,742.84
138 Lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,87 1 m³ 898,770.13
139 Beton mutu f'c = 14,5 Mpa (K 175), slump (12 +/ 2) cm, w/c 0,66 1 m³ 1,065,005.09
140 Beton mutu f'c = 16,9 Mpa (K 200), slump (12 +/ 2) cm, w/c 0,61r 1 m³ 1,095,185.04
141 Beton mutu f'c = 19,3 Mpa (K 225), slump (12 +/ 2) cm, w/c 0,58 1 m³ 1,118,797.60
142 Beton mutu f'c = 21,7 Mpa (K 250), slump (12 +/ 2) cm, w/c 0,56 1 m³ 1,133,127.69
143 Beton mutu f'c = 24 Mpa (K 275), slump (12 +/ 2) cm, w/c 0,53 1 m³ 1,162,464.11
144 Beton mutu f'c = 26,4 Mpa (K 300), slump (12 +/ 2) cm, w/c 0,52 1 m³ 1,165,466.67
145 Beton mutu f'c = 28,8 Mpa (K 325), slump (12 +/ 2) cm, w/c 0,49 1 m³ 1,252,610.45
146 Beton mutu f'c = 31,2 Mpa (K 350), slump (12 +/ 2) cm, w/c 0,48 1 m³ 1,262,615.70
147 Beton kedap air dengan storox-100 1 m³ 1,220,876.87
148 Pembesian dengan besi polos atau besi ulir 1 Kg 14,359.50
149 Memasang jaring kawat/wiremesh θ 6 1 m² 156,715.50
150 Memasang jaring kawat/wiremesh θ 8 1 m² 180,915.50
151 Memasang jaring kawat/wiremesh θ 10 1 m² 211,715.50
152 Pasang bekisting untuk pondasi 1 m² 237,970.00
153 Pasang bekisting untuk sloof 1 m² 255,470.00
154 Pasang bekisting untuk kolom 1 m² 399,460.00
155 Pasang bekisting untuk balok 1 m² 409,960.00
156 Pasang bekisting untuk lantai 1 m² 451,460.00
157 Pasang bekisting untuk tangga 1 m² 363,935.00
158 Jembatan untuk pengecoran beton 1 m² 136,910.00
159 Membuat pondasi beton bertulang (150 kg besi + bekisting) 1 m³ 4,402,932.18
160 Membuat sloof beton bertulang (200 kg besi + bekisting) 1 m³ 5,413,167.18
161 Membuat kolom beton bertulang (300 kg besi + bekisting) 1 m³ 8,781,167.18
162 Membuat balok beton bertulang (200 kg besi + bekisting) 1 m³ 6,849,217.18
163 Membuat Kolom beton bertulang (150 kg besi+bekisting) 1 m³ 6,026,432.18
164 Membuat dinding beton bertulang (150 kg besi + bekisting) 1 m³ 5,940,582.18
165 Membuat tangga beton bertulang (200 kg besi + bekisting) 1 m³ 6,310,967.18
166 Membuat Kolom praktis beton bertulang (11x11) cm 1 m¹ 80,574.90
167 Membuat ring balok beton bertulang (10 x 15) cm 1 m¹ 114,006.01
168 Pasang atap genteng kodok/glazzur 1 m² 901,535.00
169 Pasang atap asbes gelombang Besar 1 m² 47,935.00
170 Pasang atap asbes gelombang Kecil 1 m² 43,835.00
171 Pasang atap genteng beton 1 m² 365,740.00
172 Pasang atap genteng metal (setara multiroof) 1 m² 183,346.88
173 Pasang atap sirap 1 m² 356,160.00
174 Pasang nok genteng beton 1 m¹ 343,099.20
175 Pasang atap genteng aspal 1 m¹ 201,370.00
176 Pasang nok sirap 1 m¹ 63,345.00
177 Pasang atap seng gelombang 1 m² 56,560.00
178 Pasang atap nok seng 1 m² 42,150.00
179 Pasang alumunium foil/sisalation 1 m² 75,460.00
180 Langit-langit plywood (30 x 60) cm, tebal 4 mm 1 m² 52,560.00
181 Langit-langit plywood (30 x 60) cm, tebal 6 mm 1 m² 54,360.00
182 Langit-langit plywood (60 x 120) cm, tebal 4 mm 1 m² 53,835.00
183 Langit-langit plywood (60 x 120) cm, tebal 6 mm 1 m² 55,710.00
184 Langit-langit teakwood (30 x 60) cm, tebal 4 mm 1 m² 52,560.00
185 Langit-langit teakwood (60 x 120) cm, tebal 4 mm 1 m² 53,835.00
186 Langit-langit lat kayu jati 1 m² 312,130.00
187 Langit-langit softboard 1 m² 95,900.00
188 List langit-langit kayu profil 1 m¹ 25,740.00
189 Langit-langit asbes (1,00 x 1,00) m, tebal 3,2 mm rangka kayu kelas III 1 m² 97,960.00
190 Memasang kloset duduk/monoblok 1 Bh 1,437,050.00
191 Memasang kloset jongkok porselen 1 Bh 542,106.84
192 Memasang urinoir 1 Bh 1,637,606.84
193 Memasang wastafel 1 Bh 962,836.00
194 Memasang bak mandi Fibreglass volume 0,30 M3 1 Bh 1,111,900.00
195 Memasang bak mandi batu bata volume 0,30 M3 1 Bh 1,756,536.85
196 Membuat bak fiberglass volume 1 M3 air 1 Bh 1,605,700.00
197 Memasang bak kontrol pasangan batu bata ukuran (30x30) cm, tinggi 35 cm 1 Bh 581,131.10
198 Memasang bak kontrol pasangan batu bata ukuran (45x45) cm, tinggi 50 cm 1 Bh 409,598.98
199 Memasang pipa galvanis (Medium A), diameter 1/2" 1 M¹ 49,040.00
200 Memasang pipa galvanis (Medium A), diameter 3/4" 1 M¹ 59,840.00
201 Memasang pipa galvanis (Medium A), diameter 1" 1 M¹ 73,040.00

SATUAN JADI 2016 Halaman 121 dari 127 halaman


HARGA
NO. URAIAN PEKERJAAN SATUAN KETERANGAN
(Rp.)
202 Memasang pipa galvanis (Medium A), diameter 2" 1 M¹ 129,248.00
203 Memasang pipa galvanis (Medium A), diameter 3" 1 M¹ 192,848.00
204 Memasang pipa PVC dia. 4" AW 1 M¹ 93,116.00
205 Memasang pipa PVC dia. 3" AW 1 M¹ 62,516.00
206 Memasang pipa PVC dia.2" AW 1 M¹ 37,916.00
207 Memasang pipa PVC dia. 1.5" AW 1 M¹ 33,416.00
208 Memasang pipa PVC dia. 1" AW 1 M¹ 30,074.00
209 Memasang pipa PVC dia. 3/4" AW 1 M¹ 17,216.00
210 Memasang pipa PVC Dia. 1/2" AW 1 M¹ 17,816.00
211 Memasang kran diameter 3/4" atau 1/2" 1 Bh 50,600.25
212 Memasang floor drain 1 Bh 35,600.00
213 Besi profil 1 Kg 34,561.00
214 Pasang rangka kuda-kuda baja IWF 1 Kg 34,561.00
215 Pekerjaan perakitan 100 Kg 39,034.48
216 Pintu besi plat baja tebal 2mm rangkap, rangka baja siku 1 m² 0.00
217 Pengelasan dengan las listrik 100 cm 24,116.14
218 Pasang jendela besi 1 m² 1,002,630.00
219 Pasang jendela besi tahan api 1 m² 1,170,920.00
220 Pasang pintu gulung besi 1 m² 1,038,720.00
221 Pasang pintu lipat 1 m² 1,002,624.00
222 Pasang pintu Sunscreen alumunium 1 m² 245,480.00
223 Pasang Rolling door 1 m² 738,720.00
224 Pasang pintu alumunium 1 m² 527,624.00
225 Pasang venetions blinds 1 m² 144,210.00
226 Pasang Venetion blinds 1 m² 144,210.00
227 Pasang trali besi 1 m² 1,283,872.00
228 Pasang kawat harmonika 1 m² 65,185.00
229 Pasang kawat nyamuk 1 m² 65,185.00
230 Pasang kawat kassa 1 m² 47,310.00
231 Pasang kawat burung 1 m² 50,060.00
232 Pasang jendela nako & tralis 1 m² 571,170.00
233 Pasang talang datar, seng bjls 25 1 m¹ 138,770.00
234 Pasang talang miring, seng bjls 25 1 m¹ 165,420.00
235 Pasang talang 1/2 lingkaran D -10 cm, seng bjls 25 1 m¹ 155,700.00
236 Pasang talang 1/2 lingkaran D -10 cm, seng bjls 24 1 m¹ 179,700.00
237 Pasang kunci tanam biasa 1 Bh 140,600.00
238 Pasang kunci tanam kamar mandi 1 Bh 139,050.00
239 Pasang kunci silinder 1 Bh 138,780.00
240 Pasang engsel pintu 1 Bh 32,590.00
241 Pasang engsel jendela kupu-kupu 1 Bh 22,560.00
242 Pasang engsel angin 1 Bh 36,200.00
243 Pasang kait angin 1 Bh 40,090.00
244 Pasang door closer 1 Bh 825,300.00
245 Pasang kunci selot 1 Bh 60,120.00
246 Pasang pegangan pintu / door holder 1 Bh 325,300.00
247 Pasang door stop 1 Bh 65,060.00
248 Pasang rel pintu dorong 1 Bh 502,860.00
249 Pasang kunci lemari 1 Bh 62,650.00
250 Pasang kaca, tebal 3 mm 1 m² 157,890.00
251 Pasang kaca, tebal 5 mm 1 m² 196,390.00
252 Pasang kaca, tebal 8 mm 1 m² 228,346.00
253 Pasang kaca buram, tebal 12 mm 1 m² 41,850.00
254 Pasang kaca cermin, tebal 5 mm 1 m² 202,990.00
255 Pasang kaca cermin, tebal 8 mm 1 m² 246,990.00
256 Pasang kaca cermin, tebal 8 mm 1 m² 249,246.00
257 Pasang kaca "wireglass, tebal 5 mm 1 m² 187,590.00
258 Pasang kaca patri, tebal 5 mm 1 m² 352,590.00
259 Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm 1 m² 124,525.94
260 Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm 1 m² 119,356.64
261 Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm 1 m² 116,936.23
262 Pasang lantai ubin warna ukuran 40 x 40 cm 1 m² 133,499.95
263 Pasang lantai ubin warna ukuran 30 x 30 cm 1 m² 130,131.64
264 Pasang lantai ubin warna ukuran 20 x 20 cm 1 m² 134,460.03
265 Pasang lantai granito warna ukuran 40 x 40 cm 1 m² 285,040.94
266 Pasang lantai granito warna ukuran 30 x 30 cm 1 m² 675,067.64
267 Pasang lantai teralus kerang ukuran 40 x 40 cm 1 m² 607,057.47
268 Pasang lantai ubin teralux kerang ukuran 30 x 30 cm 1 m² 407,667.64
269 Pasang lantai ubin teralux marmer ukuran 60 x 60 cm 1 m² 542,048.15
270 Pasang lantai ubin teralux marmer ukuran 40 x 40 cm 1 m² 427,287.47
271 Pasang plint ubin pc abuabu ukuran 15 x 30 cm 1 m¹ 13,377.62

SATUAN JADI 2016 Halaman 122 dari 127 halaman


HARGA
NO. URAIAN PEKERJAAN SATUAN KETERANGAN
(Rp.)
272 Pasang plint ubin pc abu-abu ukuran 10 x 30 cm 1 m¹ 12,312.02
273 Pasang plint ubin pc abu-abu ukuran 10 x 40 cm 1 m¹ 11,602.02
274 Pasang plint ubin pc warna ukuran 10 x 20 cm 1 m¹ 27,086.97
275 Pasang plint ubin pc warna ukuran 10 x 40 cm 1 m¹ 25,021.97
276 Pasang plint ubin granito ukuran 10 x 40 cm 1 m¹ 104,181.97
277 Pasang plint ubin granito ukuran 10 x 30 cm 1 m¹ 207,210.15
278 Pasang plint ubin teralux kerang ukuran 10 x 40 cm 1 m¹ 184,810.15
279 Pasang plint ubin teralux kerang ukuran 10 x 30 cm 1 m¹ 210,540.15
280 Pasang plint ubin teralux marmer ukuran 10 x 60 cm 1 m¹ 171,060.15
281 Pasang plint ubin teralux marmer ukuran 10 x 40 cm 1 m¹ 201,990.15
282 Pasang plint ubin teralux marmer ukuran 10 x 30 cm 1 m¹ 223,860.15
283 Pasang lantai keramik artistik 10 x 20 cm 1 m² 307,880.13
284 Pasang lantai keramik artistik 10 x 10 cm 1 m² 488,880.13
285 Pasang lantai keramik artistik 5 x 20 cm 1 m² 457,880.13
286 Pasang plint keramik artistik 10 x 20 cm 1 m¹ 41,310.15
287 Pasang plint keramik artistik 10 x 10 cm 1 m¹ 59,050.15
288 Internal cove artistik (5x5x 20) cm 1 m¹ 199,466.77
289 Pasang plint vinyil tanpa adukan 1 m¹ 319,380.00
290 Pasang lantai keramik 15 x 15 cm 1 m² 237,080.13
291 Pasang lantai keramik 20 x 20 cm 1 m² 214,130.13
292 Pasang lantai keramik 25 x 25 cm 1 m² 197,880.13
293 Pasang lantai keramik 15 x 20 cm 1 m² 224,580.13
294 Pasang lantai mosaik 30 x 30 cm, ex lokal 1 m² 730,677.05
295 Pasang lantai marmer 1 m² 482,452.05
296 Pasang lantai karpet 100% wool 1 m² 224,695.00
297 Pasang lantai karpet 80% wool, 20% nylon 1 m² 150,670.00
298 Pasang underlyer, tebal 6 mm 1 m² 208,020.00
299 Pasang lantai karpet 1 m² 132,064.00
300 Pasang lantai parquet jati 1 m² 323,400.00
301 Pasang gymfloor 1 m² 260,400.00
302 Pasang dinding porselin 11 x 11 cm, putih 1 m² 243,632.11
303 Pasang dinding keramik artistik 10 x 20 cm 1 m² 311,332.11
304 Pasang dinding keramik artistik 5 x 20 cm 1 m² 461,332.11
305 Pasang dinding keramik 10 x 20 cm 1 m² 223,832.11
306 Pasang dinding keramik 15 x 15 cm 1 m² 242,332.11
307 Pasang dinding keramik 20 x 20 cm 1 m² 173,832.11
308 Pasang dinding keramik 10 x 20 cm 1 m² 178,332.11
309 Pasang dinding marmer 1 m² 553,803.41
310 Pasang dinding bata pelapis 7x3x24 cm 1 m² 212,203.41
311 Pasang dinding bata klinker 5x5x25 cm 1 m² 326,853.41
312 Pasang lantai vinyl karet 30 x 30 cm KL I 1 m² 985,775.00
313 Pasang lantai vinyl karet 30 x 30 cm KL II 1 m² 985,775.00
314 Pasang lantai vinyl asbes 30 x 30 cm 1 m² 184,650.00
315 Pasang lantai vinyl motif kembang 30 x 30 cm 1 m² 239,900.00
316 Pasang wall covering lebar 50 cm 1 m² 216,695.00
317 Floor hardener ferrovax 1 m² 112,020.00
318 Mengikis/mengerok permukaan cat tembok lama 1 m² 15,800.00
319 Mencuci bidang permukaan tembok yang pernah di cat 1 m² 16,186.00
320 Mengerok karat cat lama permukaan baja dengan cara manual 1 m² 16,186.00
321 Menyabun permukaan tembok lama 1 m² 16,186.00
322 Mendempul dan menggosok kayu 1 m² 13,670.90
323 Plamur 1 m² 17,205.00
324 Plamur permukaan gypsum 1 m² 12,750.00
325 Cat dinding dalam & cat plafon (Cat Setara Dulux) 1 m² 51,740.00
326 Cat dinding luar & cat dinding / plafon KM (Cat Setara Dulux) 1 m² 59,240.00
327 Cat dinding dalam & cat plafon (Cat Setara Metrolite/Catylac) 1 m² 36,365.00
328 Cat dinding luar & cat dinding / plafon KM (Cat Setara Metrolite/Catylac) 1 m² 43,865.00
329 Cat tembok / plafon ( Rehab ) (Cat Setara Metrolite/Catylac) 1 m² 43,436.67
330 Cat minyak ( Setara Glotex/ Seiv) 1 m² 107,125.00
331 Cat minyak (rehab) ( Setara Glotex/ Seiv) 1 m² 55,130.00
332 Cat kayu woodstain 1 m² 89,955.00
333 Pelaburan bidang kayu dengan politur 1 m² 45,205.00
334 Pengecatan bidang kayu dengan cat residu dan ter 1 m² 22,095.00
335 Pelaburan bidang kayu dengan vernis 1 m² 45,637.50
336 Pemasangan wall paper 1 m² 171,100.00
337 Pengecatan permukaan baja dengan meni besi 1 m² 36,200.00
338 Pengecatan permukaan baja dengan meni besi dan perancah 1 m² 61,600.00
339 Pengecatan permukaan baja lapis seng (galbani) secara manual sistem 4 lapis cat 1 m² 22,620.00
konvensional

SATUAN JADI 2016 Halaman 123 dari 127 halaman


HARGA
NO. URAIAN PEKERJAAN SATUAN KETERANGAN
(Rp.)
340 Pengecatan permukaan baja lapis seng (galbani) secara semprot (airless spray) dengan 1 m² 15,900.00
sistem 1 lapis cat mutakhir dengan tebal 200 µm
341 Pemasangan 1 m2 paving block natural tebal 6 cm 1 m² 75,865.00
342 Pemasangan 1 m2 paving block natural tebal 8 cm 1 m² 81,182.00

Catatan :
- Sesuai harga yang berlaku dipasaran.
- Harga satuan belum termasuk pajak yang berlaku.
- Harga sewaktu-waktu bisa berubah

SATUAN JADI 2016 Halaman 124 dari 127 halaman


LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Nomor :
Tanggal :
Tentang : Penetapan Standardisasi Harga Satuan Jadi
di lingkungan Dinas Pekerjaan Umum Kota Manado 2014

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

Asphalt Mixing Plant (AMP) BIAYA


No. URAIAN KO HP KAP. SEWA KET.
DE ALAT/JAM
(di luar PPN)

1 ASPHALT MIXING PLANT (AMP) E01 294 60 T/Jam 7,656,292.06


2 ASPHALT FINISHER E02 72.4 10 Ton 953,281.19
3 ASPHALT SPRAYER E03 4 850 Liter 63,294.54
4 BULLDOZER 100-150 HP E04 155 100-150 HP 565,366.32
5 COMPRESSOR 4000-6500 L\M E05 60 5000 CPM/(L/m) 177,461.87
6 CONCRETE MIXER 0.3-0.6 M³ E06 20 500 Liter 172,931.63
7 CRANE 10-15 TON E07 138 15 Ton 668,999.46
8 DUMP TRUCK 3.5 TON E08 100 3.5 Ton 264,243.51
9 DUMP TRUCK 10 TON E09 190 10 Ton 511,105.58
10 EXCAVATOR 80-140 HP E10 133 0.93 M3 507,078.47
11 FLAT BED TRUCK 3-4 M³ E11 190 10 ton 504,177.68
12 GENERATOR SET E12 180 135 KVA 453,703.02
13 MOTOR GRADER >100 HP E13 135 ˃100 HP 470,016.25
14 TRACK LOADER 75-100 HP E14 70 0.8 M3 301,059.08
15 WHEEL LOADER 1.0-1.6 M³ E15 96 1.5 M3 361,144.63
16 THREE WHEEL ROLLER 6-8 T E16 55 8 Ton 223,852.37
17 TANDEM ROLLER 6-8 T. E17 82 8.1 Ton 481,411.34
18 TIRE ROLLER 8-10 T. E18 100.5 9 Ton 450,358.94
19 VIBRATORY ROLLER 5-8 T. E19 82 7.05 Ton 415,777.20
20 CONCRETE VIBRATOR E20 5.5 25 - 41,243.23
21 STONE CRUSHER E21 220 50 T/Jam 739,364.13
22 WATER PUMP 70-100 MM E22 6 100 Mm 38,924.42
23 WATER TANKER 3000-4500 L. E23 100 4000 Liter 254,384.67
24 PEDESTRIAN ROLLER E24 8.8 835 Ton 88,711.76
25 TAMPER E25 4.7 121 Ton 46,308.72
26 JACK HAMMER E26 0 1330 PSI 33,053.99
27 FULVI MIXER E27 345 2005 M3 1,416,062.84
28 CONCRETE PUMP E28 100 8 M3 260,646.68
29 TRAILER 20 TON E29 175 20 Ton 526,700.92
30 PILE DRIVER + HAMMER E30 25 2.5 Ton 285,105.39
31 CRANE ON TRACK 35 TON E31 125 35 Ton 476,465.07
32 WELDING SET E32 40 250 Amp 113,311.08
33 BORE PILE MACHINE E33 150 2000 Meter 838,763.52
34 ASPHALT LIQUID MIXER E34 5 1000 Liter 39,226.23
35 ASPHALT LIQUID MIXER E34a 40 20000 Liter 113,084.17
36 TRONTON E35 150 15 Ton 565,065.57
37 COLD MILLING E36 248 - - 312,458.83
38 ROCK DRILL BREAKER E37 3 1000 m 1,742,321.22
39 COLD RECYCLER E38 900 2.2 M 6,571,462.09
40 HOT RECYCLER E39 400 3 M 7,829,602.48
41 AGGREGAT (CHIP) SPREADER E40 115 3.5 M 561,732.47
42 ASPHALT DISTRIBUTOR E41 115 4000 Liter 382,142.54
43 SLIP FORM PAVER E42 105 2.5 M 562,968.78
44 CONCRETE PAN MIXER E43 134 600 Liter 681,704.31
45 CONCRETE BREAKER E44 290 20 m3/jam 871,246.96
46 ASPAHLT TANKER E45 190 4000 liter 580,772.52
47 CEMENT TANKER E46 190 4000 liter 536,244.12
48 CONDRETE MIXER (350) E47 20 350 liter 80,424.73 T x Te1 x Te2 x Fa
49 VIBRATING RAMMER E48 4.2 80 KG 46,657.97
50 TRUK MIXER (AGITATOR) E49 220 5 M3 666,942.55
51 BORE PILE MACHINE E50 125 60 CM 686,218.26
52 CRANE ON TRACK 75-100 TON E51 200 75 Ton 660,326.53
52 BLENDING EQUIPMENT E52 50 30 Ton 237,293.05
54 CHAINSAW Jam 42500

E05

E06

Catatan : T x Te1 x Te2 x Fa


- BIAYA SEWA PERALATAN PER JAM dilakukan berdasarkan ANALISA BAYA PERALATAN PAHS Bina Marga
menggunakan baberapa asumsi ( Jam kerja efektif 8 jam, Asuransi / pajak peralatan, Tingkat suku bunga ).
- BIAYA SEWA PERALATAN PER JAM sudah termasuk biaya pengembalian modal, biaya asuransi, biaya operasional seperti
bahan bakar pelumas, perbaikan dan perawatan.
- BIAYA SEWA PERALATAN belum termasuk biaya K3
- BIAYA SEWA PERALATAN belum termasuk pajak.

Menyetujui,
KEPALA DINAS PEKERJAAN UMUM KONSULTAN
KOTA MANADO PT. MEDALION ESA PERKASIN

Ir. FERRY T. SIWI, MT MEITA M. M. TUMEWU, ST


NIP. 19590626 199103 1 008 Direktur
ukuran tegel
s s jlh harga dos
0.25 0.25 0.0625 16 16 75000
0.4 0.4 0.16 6.25 6 75000
0.3 0.3 0.09 11.11111 11 75000
0.25 0.25 0.0625 16 16 75000
0.2 0.2 0.04 25 25 75000
0.15 0.15 0.0225 44.44444 44 75000
0.1 0.1 0.01 100 100 75000
harga buah
4,687.50 4,688.00
12,500.00 12,500.00
6,818.18 6,818.00
4,687.50 4,688.00
3,000.00 3,000.00
1,704.55 1,705.00
750.00 750.00

Anda mungkin juga menyukai