15/03/2023
No. Nama Barang Standar Sat Harga EE
1 2 3 4
34 Kawat Ikat /Bandrat kg 23.000,00
35 Besi Beton Polos kg 12.000,00
36 Multiplek 120 X 244 X 6 mm Lbr 75.000,00
37 Multiplek 120 X 244 X 9 mm Lbr 100.000,00
38 Minyak bekisting Lbr 20.000,00
39 Pelindung pernafasan (masker) Box 50.000,00
40 Sarung tangan Psg 6.500,00
41 Peralatan P3K (kotak P3K) Bh 250.000,00
42 Rambu Kerja Bh 75.000,00
43 Mandor Hari 150.000,00
44 Kepala Tukang Hari 145.000,00
45 Tukang Hari 125.000,00
46 Pekerja Hari 100.000,00
47 Wheel Loader jam 488.900,84
48 3 Wheel Roller 6-8 ton jam 243.013,67
49 Concrete Mixer/Molen jam 92.994,50
50 Excavator jam 424.102,39
51 Motor Grader jam 434.856,38
52 AMP jam 8.550.143,86
53 Genset jam 348.214,45
54 Pick Up jam 200.000,00
55 Dump Truck 3 - 4 m³ jam 248.525,50
56 Dump Truck 6 - 8 m³ jam 399.990,46
57 Asp Finisher jam 480.952,70
58 Asp. Sprayer jam 385.911,58
59 Power Broom jam 74.285,07
60 Tandem Roller jam 443.814,18
61 P. Tyre Roller jam 483.317,30
62 Baby Vibratory Roller jam 86.603,33
63 Air Compressor jam 153.727,65
64 Asphalt Distributor jam 385.911,58
65 Chainsaw Jam 42.142,86
66 Alat bantu Ls -
15/03/2023