DAFTAR HARGA UPAH DAN BAHAN

KABUPATEN ACEH UTARA

HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. UPAH
1 Kepala Tukang Hari 120,000.00
2 Mandor Hari 90,000.00
3 Pekerja Hari 68,000.00
4 Tukang Hari 100,000.00

B. BAHAN
1 Air Liter 50.00
2 Atap Seng Genteng Metal 0,30 Lembar 70,000.00
3 Batu Bata Buah 750.00
Balok Kayu Kelas I M3 11,859,375.00
Balok Kayu Kelas II M3 7,115,625.00
4 Batu Kali/Batu Belah (Sungai/Gunung) 15/20 Cm M3 287,500.00
5 Batu Belah 5/7 Cm M3 442,750.00
6 Besi Beton Polos Kg 15,275.00
7 Besi Beton Ulir Kg 18,299.00
8 Besi Strip Tebal 5 mm Kg 18,000.00
9 Cat Dasar Kg 32,890.00
10 Cat Tembok Extana Avitek Kg 23,403.00
11 Cat Kayu/Minyak Kg 51,750.00
12 Cat Menie Besi Kg 55,344.00
13 Kayu Bakau/Dolken Kayu Ø 8 - 10, 4 Meter Batang 20,000.00
14 Engsel Jendela 3" Pasang 18,975.00
15 Engsel Pintu 4" Pasang 23,719.00
16 Gypsum Tebal 9 mm Lembar 94,875.00
17 Kaca Bening Tebal 5 mm M2 154,172.00
18 Kait Angin Buah 15,813.00
19 Kawat Beton Kg 21,491.00
20 Kayu Klas I (Semantok/Damar Laut) M3 8,855,000.00
21 Kayu Klas II (Merantee/Kruing) M3 6,957,500.00
22 Kayu Klas III (Semaram/Borneo/dll) untuk Bekesting M3 5,000,000.00
23 Kayu Klas IV (Sengon/dll) untuk Bouwplank M3 5,000,000.00
24 Keramik 20 x 20 Cm Buah 2,833.60
25 Keramik 40 x 40 Cm Homogenius Polished Buah 13,156.00
26 Keramik 40 x 40 Cm Homogenius Unpolished Buah 13,156.00
27 Keramik 30 x 30 Cm Homogenius Polished Buah 4,667.85
28 Keramik 30 x 30 Cm Homogenius Unpolished Buah 6,831.00
29 Keramik Dinding 20 x 25 Cm Buah 3,660.00
30 Keramik Sisi Kulit Jeruk 20 x 20 Cm Buah 2,833.60
31 Kerikil Beton/Bersih M3 265,000.00
32 Kerikil Beton/Bersih (1.350 Kg/M3) Kg 196.30
33 Kertas Amplas Lembar 6,279.00
34 Kunci Pintu Buah 145,475.00
35 Lem Kayu Kg 39,531.00
36 List Profil Triplek M' 7,700.00
37 Minyak Bekisting Liter 5,000.00
HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

38 Paku Kayu Biasa Kg 25,300.00


39 Paku Triplek Kg 25,300.00
40 Paku Seng Kg 28,463.00
41 Paku Skrup Kg 31,625.00
42 Pasir Beton M3 250,000.00
43 Pasir Beton (1.400 Kg/M3) Kg 178.57
44 Pasir Pasang M3 250,000.00
45 Pasir Pasang (1.400 Kg/M3) Kg 178.57
46 Pasir Urug M3 200,000.00
47 Pemasangan Titik Lampu + Instalasi Titik 94,875.00
48 Plamir Kg 18,975.00
49 Plywood form 4 mm Lembar 83,490.00
50 Plywood form 9 mm Lembar 187,220.00
51 Rabung Seng Genteng Metal 0,3 Lembar 63,250.00
52 Rabung Seng 0,30 Lembar 33,249.00
53 Semen Portland @ 40 Kg Zak 65,000.00
54 Semen Porland Kg 1,625.00
55 Semen Warna @ 50 Kg Zak 247,070.00
56 Semen Warna Kg 4,941.40
57 Seng Superdeck 8 Kaki Lembar 153,951.00
58 Seng Gelombang Bjls. 0,2 Lembar 67,045.00
59 Seng Plat Bjls. 0,2 Lembar 60,720.00
60 Tanah Timbun M3 80,000.00
61 Triplek 4 MM Lembar 75,000.00

Mengatahui/menyetujui Banda Aceh, April 2015


Ketua Pengguna Anggaran (KPA) Konsultan Perencana
Kepala Bidang Pendidikan Prasekolah CV. BINA ENGINEERING COMSULTANT
Dasar dan Lanjutan
Dinas Pendidikan Provinsi Aceh

Bahrum Yacob, S.Pd Nurizal. ST


Pembina TK.I/Nip. 19591231 197910 1 014 Direktur
LAMPIRAN PERHITUNGAN LUAS BEKISTING PER METER KUBIT BETON

VOLUME/KELILING JUMLAH
NO. URAIAN BANYAK JUMLAH
P (M) L (M) T (M) T' (M) DIBULATKAN

1 Kolom 15 x 15 Cm
Beton 0.150 0.150 0.023 M2
1 M3 Dibagi Dengan Jumlah 1.000 44.444 M1

Bekisting 0.150 0.150 0.150 0.150 0.600 M1

Jumlah Panjang Beton x Panjang Bekisting 26.667 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 13.333 M2 13.333 M2

2 Kolom 13 x 13 Cm
Beton 0.130 0.130 0.017 M2
1 M3 Dibagi Dengan Jumlah 1.000 59.172 M1

Bekisting 0.130 0.130 0.260 M1

Jumlah Panjang Beton x Panjang Bekisting 15.385 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 5.128 M2 5.128 M2

3 Sloof 30 x 40 Cm
Beton 0.300 0.400 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1

Bekisting 0.400 0.400 0.800 M1

Jumlah Panjang Beton x Panjang Bekisting 6.667 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 2.222 M2 2.222 M2

4 Balok 30 x 50 Cm
Beton 0.300 0.500 0.150 M2
1 M3 Dibagi Dengan Jumlah 1.000 6.667 M1

Bekisting 0.300 0.380 0.380 1.060 M1

Jumlah Panjang Beton x Panjang Bekisting 7.067 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 3.533 M2 3.533 M2

5 Balok 30 x 40 Cm
Beton 0.300 0.400 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1

Bekisting 0.300 0.280 0.280 0.860 M1

Jumlah Panjang Beton x Panjang Bekisting 7.167 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 3.583 M2 3.583 M2

6 Balok 20 x 40 Cm
Beton 0.200 0.400 0.080 M2
1 M3 Dibagi Dengan Jumlah 1.000 12.500 M1

Bekisting 0.200 0.280 0.280 0.760 M1

Jumlah Panjang Beton x Panjang Bekisting 9.500 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 4.750 M2 4.750 M2

7 Balok Latai 25 x 30 Cm
Beton 0.250 0.300 0.075 M2
1 M3 Dibagi Dengan Jumlah 1.000 13.333 M1

Bekisting 0.250 0.300 0.300 0.850 M1

Jumlah Panjang Beton x Panjang Bekisting 11.333 M2


VOLUME/KELILING JUMLAH
NO. URAIAN BANYAK JUMLAH
P (M) L (M) T (M) T' (M) DIBULATKAN
Asumsi 2 Kali Pemakaian Bekisting 2.000 5.667 M2 5.667 M2

8 Balok Latai 13 x 15 Cm
Beton 0.130 0.150 0.020 M2
1 M3 Dibagi Dengan Jumlah 1.000 51.282 M1

Bekisting 0.150 0.150 0.300 M1

Jumlah Panjang Beton x Panjang Bekisting 15.385 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 5.128 M2 5.128 M2

9 Ring Balok 13 x 15 Cm
Beton 0.130 0.150 0.020 M2
1 M3 Dibagi Dengan Jumlah 1.000 51.282 M1

Bekisting 0.150 0.150 0.300 M1

Jumlah Panjang Beton x Panjang Bekisting 15.385 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 5.128 M2 5.128 M2

10 Ring Balok 13 x 40 Cm
Beton 0.130 0.400 0.052 M2
1 M3 Dibagi Dengan Jumlah 1.000 19.231 M1

Bekisting 0.140 0.400 0.400 0.940 M1

Jumlah Panjang Beton x Panjang Bekisting 18.077 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 6.026 M2 6.026 M2

11 Plat Lantai T = 12 Cm
Beton 0.120 1.000 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1

Bekisting 1.000 1.000 M1

Jumlah Panjang Beton x Panjang Bekisting 8.333 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 4.167 M2 4.167 M2

12 Plat Lantai Tangga T = 15 Cm


Beton 0.150 1.000 0.150 M2
1 M3 Dibagi Dengan Jumlah 1.000 6.667 M1

Bekisting 1.000 1.000 M1

Jumlah Panjang Beton x Panjang Bekisting 6.667 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 3.333 M2 3.333 M2

13 Kolom 30/40 Cm
Beton 0.300 0.400 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1

Bekisting 0.300 0.400 0.300 0.400 1.400 M1

Jumlah Panjang Beton x Panjang Bekisting 11.667 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 3.889 M2 3.889 M2
VOLUME/KELILING JUMLAH
NO. URAIAN BANYAK JUMLAH
P (M) L (M) T (M) T' (M) DIBULATKAN
14 Kolom 30/30 Cm
Beton 0.300 0.300 0.090 M2
1 M3 Dibagi Dengan Jumlah 1.000 11.111 M1

Bekisting 0.300 0.300 0.300 0.300 1.200 M1

Jumlah Panjang Beton x Panjang Bekisting 13.333 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 4.444 M2 4.444 M2

15 Kolom 13 x 13 Cm
Beton 0.130 0.130 0.017 M2
1 M3 Dibagi Dengan Jumlah 1.000 59.172 M1

Bekisting 0.130 0.130 0.260 M1

Jumlah Panjang Beton x Panjang Bekisting 15.385 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 5.128 M2 5.128 M2

-
-
Sinabang, 04 Mei 2017
CV. DAMAI FAAKHI-AKHI

-
-
PERHITUNGAN VOLUME

PEKERJAAN : PEMBANGUNAN RUMAH BIDAN DAN PENATAAN HALAMAN PUSKESMAS SANGGIRAN (OTSUS)
LOKASI : KABUPATEN SIMEULUE
### ###
#REF!

Lebar Lebar Jumlah


No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1.000 Paket 1.000 Paket

2 Mobilisasi Dan Demobilisasi 1.000 Ls 1.000 Ls

3 Pengukuran dan Pemasangan Bowplank 1.000 Ls 1.000 Ls

4 Pemasangan Papan Proyek 1.000 Ls 1.000 Ls

6 Administrasi Dan Dokumentasi 1.000 Ls 1.000 Ls

### #REF!
### PEKERJAAN TANAH DAN PASIR
### Galian Tanah Pondasi Tapak Type I 2.200 2.200 1.650 20.000 159.720 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 20.000 14.915 M3
174.635 M3 174.635 M3

### Galian Tanah Pondasi Tapak Type II 1.700 1.700 1.650 16.000 76.296 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 16.000 11.932 M3
2.000 1.700 1.650 1.000 5.610 M3
93.838 M3 93.838 M3

### Galian Tanah Pondasi Menerus 104.000 0.400 0.450 18.720 M3 18.720 M3

### Urugan Tanah 1/4 x Galian 71.798 M3 71.798 M3

### Urugan Pasir di bawah Pondasi 104.000 0.400 0.050 2.080 M3


2.200 2.200 0.050 20.000 4.840 M3
1.700 1.700 0.050 16.000 2.312 M3
2.000 1.700 0.050 1.000 0.170 M3
9.402 M3 9.402 M3

### Pondasi Batu Kali 1 : 4 104.000 0.250 0.400 0.200 0.300 10.400 M3 10.400 M3

### Cincin Sumur 2.000 20.000 40.000 M3


2.000 16.000 32.000 M3
72.000 M3 72.000 M3

### Beton Cor 1 : 2 : 3 Isian Sumuran 0.785 1.000 3.140 0.500 20.000 15.700 M3
0.785 1.000 3.140 0.500 16.000 12.560 M3
28.260 M3 28.260 M3

### Lantai Kerja di bawah Pondasi Tapak 2.200 2.200 0.100 20.000 9.680 M3
1.700 1.700 0.100 16.000 4.624 M3
2.000 1.700 0.100 1.000 0.340 M3
14.644 M3 14.644 M3

### PEKERJAAN BETON/BETON BERTULANG


### Beton Bertulang Pondasi Tapak 2.000 2.000 0.300 20.000 24.000 M3
1.500 1.500 0.300 16.000 10.800 M3
2.000 1.500 0.300 0.900 M3
35.700 M3 35.700 M3

### Beton Bertulang Kolom Pendestal 30/40 cm 0.400 0.300 1.450 20.000 3.480 M3
0.400 0.300 1.450 6.000 1.044 M3
4.524 M3 4.524 M3

### Beton Bertulang Kolom Pendestal 30/30 cm 0.300 0.300 1.450 10.000 1.305 M3 1.305 M3

### Beton Bertulang Sloof 30/40 cm 0.300 0.400 163.800 19.656 M3 19.656 M3

### Beton Bertulang Kolom Induk 30/40 cm 0.300 0.400 3.500 26.000 10.920 M3 10.920 M3

### Beton Bertulang Kolom Teras 30/30 cm 0.300 0.300 3.600 10.000 3.240 M3 3.240 M3

### Beton Bertulang Balok 30/50 cm 0.300 0.500 28.000 4.200 M3 4.200 M3

### Beton Bertulang Balok 30/40 cm 0.300 0.400 171.800 20.616 M3 20.616 M3

### Beton Bertulang Balok 20/40 cm 0.200 0.400 4.500 0.360 M3 0.360 M3

### Beton Bertulang Balok Latai 13/15 cm 0.130 0.150 70.000 1.365 M3 1.365 M3

### Beton Bertulang Ring Balok untuk selasar 13/15 cm 0.130 0.150 44.000 0.858 M3 0.858 M3

### Beton Bertulang Balok Ornamen Teras 30/40 cm 0.400 0.300 0.400 12.000 0.576 M3 0.576 M3

### Beton Bertulang Plat Lantai t = 12 cm 36.000 9.000 0.120 38.880 M3


4.000 4.000 0.120 1.920 M3
40.800 M3
Dikurangi balok Memajang 144.000 0.300 0.120 5.184 M3
Dikurangi balok Melintang 72.000 0.300 0.120 2.592 M3
7.776 M3
33.024 M3 33.024 M3
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan

### Beton Bertulang Plat Bordes dan Anak Tangga 6.700 2.000 0.150 2.010 M3
4.000 3.000 0.150 1.800 M3
3.810 M3 3.810 M3
LANTAI II
### Beton Bertulang Kolom Induk 30/40 cm 3.700 0.300 0.400 26.000 11.544 M3 11.544 M3

### Beton Bertulang Kolom Teras 30/30 cm 3.700 0.300 0.300 10.000 3.330 M3 3.330 M3

### Beton Bertulang Balok 25/30 cm 125.000 0.250 0.300 1.000 9.375 M3 9.375 M3

### Beton Bertulang Balok Latai 13/15 cm 72.800 0.130 0.150 1.000 1.420 M3 1.420 M3

### Beton Bertulang untuk selasar 13/15 cm (dudukan batu bata) 44.000 0.130 0.150 1.000 0.858 M3 0.858 M3

### #REF!
LANTAI I
### Pasangan Trasram Bata 1 PC : 2 PS di bawah Lantai 95.300 0.400 38.120 M2
38.120 M2 38.120 M2

2 Plesteran Trasram Bata 1 PC : 2 PS di bawah Lantai 76.240 M2 76.240 M2

### Pasangan Dinding Bata 1 PC : 4 PS 104.400 3.350 349.740 M2


3.700 3.350 12.395 M2
362.135 M2 362.135
Dikurangi Jendela, Pintu
Pintu Type. P-1 Bagian Lantai bawah 2.600 1.300 4.000 13.520 M2
Jendela Type J-1 Bagian Lantai bawah 2.650 1.400 12.000 44.520 M2
Jendela Type J-12 Bagian Lantai bawah 2.000 1.400 4.000 11.200 M2
69.240 M2
Pas. Batu Bata Dikurangi Pintu, Jendela, kolom,dll 292.895 M2 292.895 M2

4 Plesteran Dinding Bata 1 PC : 4 PS 585.790 M1 585.790 M1

#REF!
### Pasangan Dinding Bata 1 PC : 4 PS 104.400 3.550 370.620 M2
3.700 3.550 13.135 M2
370.620 M2
Dikurangi
Pas. Batu Kerawang Bagian Lantai atas 2.000 1.660 1.000 3.320 M2
Pintu Type. P-1 Bagian Lantai bawah 2.600 1.300 4.000 13.520 M2
Jendela Type J-1 Bagian Lantai bawah 2.650 1.400 12.000 44.520 M2
Jendela Type J-12 Bagian Lantai bawah 2.000 1.400 4.000 11.200 M2
72.560 M2
Pas. Batu Bata Dikurangi Pintu, Jendela, kolom,dll 298.060 M2 298.060 M2
-
### Plesteran Dinding Bata 1 PC : 4 PS 596.120 M2 596.120 M2

E. PEKERJAAN LANTAI
Pekerjaan Timbunan dan Urugan
1 Timbunan Tanah Bawah Lantai Ruangan 8.870 6.870 0.620 4.000 151.124 M3 151.124 M3
4.370 6.870 0.620 1.000 18.614 M3
169.737 M3

2 Timbunan Tanah di Bawah Selasar 40.000 1.370 0.570 31.236 M3


40.000 1.870 0.570 42.636 M3
10.370 1.370 0.570 2.000 16.196 M3
90.068 M3 90.068 M3

3 Urugan Pasir di Bawah Lantai Ruangan 8.870 6.870 0.100 4.000 24.375 M3 24.375 M3
4.370 6.870 0.100 1.000 3.002 M3
27.377 M3

4 Urugan Pasir di Bawah Lantai Selasar 40.000 1.370 0.100 5.480 M3


40.000 1.870 0.100 7.480 M3
10.370 1.370 0.100 2.000 2.841 M3
15.801 M3 15.801 M3
#REF!
### Beton Tumbuk di Bawah Lantai Keramik t = 5 cm Ruangan 8.870 6.870 0.050 4.000 12.187 M3 13.688 M3
4.370 6.870 0.050 1.000 1.501 M3
13.688 M3

### Beton Tumbuk di Bawah Lantai Keramik t = 5 cm Selasar 40.000 1.370 0.050 2.740 M3
40.000 1.870 0.050 3.740 M3
10.370 1.370 0.050 2.000 1.421 M3
7.901 M3 7.901 M3

### Lantai Keramik 40 x 40 cm Ruangan 8.870 6.870 4.000 243.748 M2 273.770 M2


4.370 6.870 1.000 30.022 M2
273.770 M2

### Lantai Keramik 40 x 40 cm Anti Slip Pada Selasar 40.000 1.370 54.800 M2
40.000 1.870 74.800 M2
10.370 1.370 2.000 28.414 M2
158.014 M2 158.014 M2
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
### #REF! 2.000 0.200 20.000 8.000 M2
2.000 0.300 20.000 12.000 M2
2.000 4.000 1.000 8.000 M2
28.000 M2 28.000 M2

7 #REF! 2.000 20.000 40.000 m' 40.000 m'

#REF!
1 #REF! 8.700 6.600 4.000 229.680 M3 M3
4.000 2.000 8.000

2 #REF! 40.000 2.000 80.000 M2 M2


4.000 2.000 8.000 M2
88.000 M2

3 #REF! 4.000 M2 M2

### #REF!
#REF!
### Kayu Kanopi Kuda-kuda Terpasang 10.000 Bh 10.000 Bh

2 Memasang Gording Kayu 120.000 0.050 0.050 0.300 M3 0.300 M3

3 Memasang Atap Genteng Metal 42.000 1.800 75.600 M2 75.600 M2

4 Kayu Listplank Uk. 3/20 cm 42.000 42.000 M' 42.000 M'

5 #REF! 6.600 8.700 4.000 229.680 M2


39.700 1.870 74.239 M2
- M2
jumlah 303.919 M2 303.919 M2
M' - M'
6 #REF! 6.600 8.700 4.000 229.680 M2
39.700 1.870 74.239 M2
- - - M2
jumlah 303.919 M2 303.919 M2

### #REF! jumlah - 128.000 M2 128.000 M2

#REF!
### Rangka Kuda-Kuda dan Gording Zincalume Type 100, 35.250 7.650 28.400 42.100 2.000 539.325
Penutup Atap dan Rabung Genteng Metal + Terpasang (SNI) 11.880 7.650 0.500 2.000 90.882
630.207 M2 630.207 M2

### Kayu Listplank Uk. 3/20 cm 107.960 107.960 M2 107.960 M2

### #REF! 6.600 8.700 4.000 229.680 M2


depan 3.000 40.000 120.000 M2
tangga 4.000 8.700 34.800 M2
samping kiri dan kanan 12.000 1.000 2.000 24.000 M2
belakang 1.100 40.000 44.000 M2
Plafond Dikurangi 452.480 M2 M2

### #REF! 452.480 M2 M2

### #REF! 32.000 4.000 128.000 M' M'


90.000 90.000 M'
218.000 M'

G. PEKERJAAN PINTU, JENDELA DAN KUNCI


1 Pintu Type P1
a. Kosen Kayu 5/13 7.600 0.130 0.050 8.000 0.395 M³ 0.395 M³

b. Daun Pintu Panel Ukuran 60 x 210 cm x 2 2.100 1.200 16.000 40.320 M² 40.320 M²

c. Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.070 16.000 2.016 M² 2.016 M²

d. Kunci Tanam Bulat 8.000 Buah 8.000 Buah

e. Pegangan Pintu 8.000 Buah 8.000 Buah

f. Engsel Pintu 24.000 24.000 Psg 24.000 Psg

g. Engsel Ventilasi 16.000 16.000 Psg 16.000 Psg

h. Hak Angin Jendela / Ventilasi 32.000 32.000 Buah 32.000 Buah

i. Grendel Ventilasi 16.000 16.000 Buah 16.000 Buah

j. Tarikan Jendela 16.000 16.000 Buah 16.000 Buah

h. Kaca 5 mm 0.300 0.500 16.000 2.400 M2 2.400 M2


Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
### Jendela Ambang Kaca Type J1 (24 Unit)
### Kosen Kayu 5/13 14.950 0.130 0.050 24.000 2.332 #REF! 2.332 #REF!

### Daun Jendela Ukuran 60 x 85 cm 2.700 0.130 0.050 96.000 1.685 #REF! 1.685 #REF!

### Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.130 0.050 96.000 1.123 #REF! 1.123 #REF!

### Engsel Jendela 96.000 #REF! 96.000 #REF!

### Engsel Ventilasi 96.000 #REF! 96.000 #REF!

### Grendel Jendela / Ventilasi 192.000 #REF! 192.000 #REF!

### Hak Angin Jendela / Ventilasi 384.000 #REF! 384.000 #REF!

### Tarikan Jendela 192.000 #REF! 192.000 #REF!

### #REF! 0.300 0.500 96.000 14.400 M2


0.750 0.500 96.000 36.000
50.400 M2 50.400 M2

3 Jendela Ambang Kaca Type J2 (8 Unit)


a. Kosen Kayu 5/13 11.600 0.130 0.050 8.000 0.603 M³ 0.603 M³

b. Daun Jendela Ukuran 85 x 90 cm 2.700 0.130 0.050 24.000 0.421 M2 0.421 M2

c. Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.130 0.050 24.000 0.281 M2 0.281 M2

d. Engsel Jendela 24.000 Psg 24.000 Psg

e. Engsel Ventilasi 24.000 Psg 24.000 Psg

f. Grendel Jendela / Ventilasi 48.000 Buah 48.000 Buah

g. Hak Angin Jendela / Ventilasi 96.000 Buah 96.000 Buah

h. Tarikan Jendela 48.000 Buah 48.000 Buah

i. Kaca 5 mm 0.300 0.500 24.000 3.600


0.750 0.500 24.000 9.000
12.600 M2 12.600 M2
### #REF!
### Armatur
- Lampu HE 18 Watt Setara Hannoch 72.000 72.000
### Stop Kontak 18.000 18.000
### Instalasi titik penerangan, instalasi termasuk kabel 72.000 72.000
NYA 3 x 2.5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang
### Instalasi titik kontak, instalasi termasuk kabel 18.000 18.000
NYA 3 x 2.5 mm dalam pipa PVC, kotak stop kontak
BROCO dan kelengkapan instalasi terpasang
### #REF!
#REF! 1.000 1.000
#REF! 4.000 4.000

### #REF!
### #REF! 40.200 630.000 655.860 1,326.060 M2 1,326.060 M2

### Cat palfond 756.399 756.399 M2 756.399 M2

### Cat Lis Plafond 218.000 0.210 45.780 M2 45.780 M2

### Cat Mengkilat Kosen, Daun Pintu, Jendela dan Jelusi


Kosen P1 1.727 8.000 13.816 M2
P2 2.100 1.200 2.000 8.000 33.600 M2
J1 3.292 8.000 26.336 M2
J2 4.329 2.000 8.658 M2
- 82.410 M2 82.410 M2

-
-
Sinabang, 04 Mei 2017
CV. DAMAI FAAKHI-AKHI

-
-
DAFTAR ANALISA HARGA SATUAN

I. PEKERJAAN TANAH
SNI 2835-2008-6.1
1 M3 Galian Tanah Keras Sedalam 1 Meter
0.7500 OH Pekerja @Rp 115,000.00 Rp. 86,250.00
0.0250 OH Mandor @Rp 115,000.00 Rp. 2,875.00
Jumlah Rp. 89,125.00
Dibulatkan Rp. 89,125.00

SNI 2835-2008-6.2
1 m³ Galian Tanah Biasa Sedalam 2 Meter
0.900 OH Pekerja @Rp 115,000.00 Rp. 103,500.00
0.045 OH Mandor @Rp 115,000.00 Rp. 5,175.00
Jumlah Rp. 108,675.00
Dibulatkan Rp. 108,675.00

SNI 2835-2008-6.9
1 M3 Urugan Tanah Kembali
0.2500 OH Pekerja @Rp 115,000.00 Rp. 28,750.00
0.0080 OH Mandor @Rp 115,000.00 Rp. 920.00
Jumlah Rp. 29,670.00
Dibulatkan Rp. 29,670.00

SNI 2835-2008-6.11
1 M3 Mengurug Pasir Urug
1.2000 M3 Pasir Urug @Rp 92.86 Rp. 111.43
0.3000 OH Pekerja @Rp 115,000.00 Rp. 34,500.00
0.0100 OH Mandor @Rp 115,000.00 Rp. 1,150.00
Jumlah Rp. 35,761.43
Dibulatkan Rp. 35,761.43

SNI 2835-2008-6.11.a
1 M3 Mengurug Tanah Timbun
1.2000 M3 Tanah Timbun @Rp 85,000.00 Rp. 102,000.00
0.3000 OH Pekerja @Rp 115,000.00 Rp. 34,500.00
0.0100 OH Mandor @Rp 115,000.00 Rp. 1,150.00
Jumlah Rp. 137,650.00
Dibulatkan Rp. 137,650.00

II. PEKERJAAN PONDASI


SNI 2836-2008-6.2
1 M3 Pasangan Batu Belah 1 PC : 4 PS
1.2000 M3 Batu Belah 15/20 cm @Rp 110,000.00 Rp. 132,000.00
0.5200 M3 Pasir Beton @Rp 15,000.00 Rp. 7,800.00
163.0000 Kg Semen Portland @Rp 71,000.00 Rp. 11,573,000.00
1.5000 OH Pekerja @Rp 115,000.00 Rp. 172,500.00
0.7500 OH Tukang @Rp 125,000.00 Rp. 93,750.00
0.0750 OH Kepala Tukang @Rp 130,000.00 Rp. 9,750.00
0.0750 OH Mandor @Rp 115,000.00 Rp. 8,625.00
Jumlah Rp. 11,997,425.00
Dibulatkan Rp. 11,997,425.00
SNI 2836-2008-6.9
1 M3 Pasangan Batu Kosong (Aanstamping)
1.2000 M3 Batu Belah 15/20 cm @Rp 110,000.00 Rp. 132,000.00
0.4320 M3 Pasir Urug @Rp 92.86 Rp. 40.11
0.7800 OH Pekerja @Rp 115,000.00 Rp. 89,700.00
0.3900 OH Tukang @Rp 125,000.00 Rp. 48,750.00
0.0390 OH Kepala Tukang @Rp 130,000.00 Rp. 5,070.00
0.0390 OH Mandor @Rp 115,000.00 Rp. 4,485.00
Jumlah Rp. 280,045.11
Dibulatkan Rp. 280,045.11

III. PEKERJAAN BETON


SNI 7394-2008-6.1
1 M3 Beton Mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
869.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 12,166,000.00
999.0000 Kg Kerikil Beton @Rp 5,220.00 Rp. 5,214,780.00
247.0000 Kg Semen Portland @Rp 71,000.00 Rp. 17,537,000.00
215.0000 Liter Air @Rp 200.00 Rp. 43,000.00
1.6500 OH Pekerja @Rp 115,000.00 Rp. 189,750.00
0.2750 OH Tukang @Rp 125,000.00 Rp. 34,375.00
0.0280 OH Kepala Tukang @Rp 130,000.00 Rp. 3,640.00
0.0830 OH Mandor @Rp 115,000.00 Rp. 9,545.00
Jumlah Rp. 35,198,090.00
Dibulatkan Rp. 35,198,090.00

SNI 7394-2008-6.4
1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,87
893.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 12,502,000.00
1,027.0000 Kg Kerikil Beton @Rp 5,220.00 Rp. 5,360,940.00
230.0000 Kg Semen Portland @Rp 71,000.00 Rp. 16,330,000.00
200.0000 Liter Air @Rp 200.00 Rp. 40,000.00
1.2000 OH Pekerja @Rp 115,000.00 Rp. 138,000.00
0.2000 OH Tukang @Rp 125,000.00 Rp. 25,000.00
0.0200 OH Kepala Tukang @Rp 130,000.00 Rp. 2,600.00
0.0600 OH Mandor @Rp 115,000.00 Rp. 6,900.00
Jumlah Rp. 34,405,440.00
Dibulatkan Rp. 34,405,440.00

SNI 7394-2008-6.5
1 M3 Beton Mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
760.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 10,640,000.00
1,029.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,371,380.00
326.0000 Kg Semen Portland @Rp 71,000.00 Rp. 23,146,000.00
215.0000 Liter Air @Rp 200.00 Rp. 43,000.00
1.6500 OH Pekerja @Rp 115,000.00 Rp. 189,750.00
0.2750 OH Tukang @Rp 125,000.00 Rp. 34,375.00
0.0280 OH Kepala Tukang @Rp 130,000.00 Rp. 3,640.00
0.0830 OH Mandor @Rp 115,000.00 Rp. 9,545.00
Jumlah Rp. 39,437,690.00
Dibulatkan Rp. 39,437,690.00
SNI 7394-2008-6.7
1 M3 Beton Mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
698.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 9,772,000.00
1,047.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,465,340.00
371.0000 Kg Semen Portland @Rp 71,000.00 Rp. 26,341,000.00
215.0000 Liter Air @Rp 200.00 Rp. 43,000.00
1.6500 OH Pekerja @Rp 115,000.00 Rp. 189,750.00
0.2750 OH Tukang @Rp 125,000.00 Rp. 34,375.00
0.0280 OH Kepala Tukang @Rp 130,000.00 Rp. 3,640.00
0.0830 OH Mandor @Rp 115,000.00 Rp. 9,545.00
Jumlah Rp. 41,858,650.00
Dibulatkan Rp. 41,858,650.00

SNI 7394-2008-6.8
1 M3 Beton Mutu F'C = 21,7 MPa (K250), Slump (12 ± 2) cm, w/c = 0,56
692.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 9,688,000.00
1039.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,423,580.00
384.0000 Kg Semen Portland @Rp 71,000.00 Rp. 27,264,000.00
215.0000 Liter Air @Rp 200.00 Rp. 43,000.00
1.6500 OH Pekerja @Rp 115,000.00 Rp. 189,750.00
0.2750 OH Tukang @Rp 125,000.00 Rp. 34,375.00
0.0280 OH Kepala Tukang @Rp 130,000.00 Rp. 3,640.00
0.0830 OH Mandor @Rp 115,000.00 Rp. 9,545.00
Jumlah Rp. 42,655,890.00
Dibulatkan Rp. 42,655,890.00
SNI 7394-2008-6.9
1 M3 Beton Mutu f'c = 24 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
684.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 9,576,000.00
1,026.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,355,720.00
406.0000 Kg Semen Portland @Rp 71,000.00 Rp. 28,826,000.00
215.0000 Liter Air @Rp 200.00 Rp. 43,000.00
1.6500 OH Pekerja @Rp 115,000.00 Rp. 189,750.00
0.2750 OH Tukang @Rp 125,000.00 Rp. 34,375.00
0.0280 OH Kepala Tukang @Rp 130,000.00 Rp. 3,640.00
0.0830 OH Mandor @Rp 115,000.00 Rp. 9,545.00
Jumlah Rp. 44,038,030.00
Dibulatkan Rp. 44,038,030.00

SNI 7394-2008-6.17
1 Kg Besi Polos
1.0500 Kg Besi Beton Polos @Rp 12,000.00 Rp. 12,600.00
0.0150 Kg Kawat Beton @Rp 15,000.00 Rp. 225.00
0.0070 OH Pekerja @Rp 115,000.00 Rp. 805.00
0.0070 OH Tukang @Rp 125,000.00 Rp. 875.00
0.0007 OH Kepala Tukang @Rp 130,000.00 Rp. 91.00
0.0004 OH Mandor @Rp 115,000.00 Rp. 46.00
Jumlah Rp. 14,642.00
Dibulatkan Rp. 14,642.00

SNI 7394-2008-6.17.a
1 Kg Besi Ulir
1.0500 Kg Besi Ulir @Rp 12,500.00 Rp. 13,125.00
0.0150 Kg Kawat Beton @Rp 15,000.00 Rp. 225.00
0.0070 OH Pekerja @Rp 115,000.00 Rp. 805.00
0.0070 OH Tukang @Rp 125,000.00 Rp. 875.00
0.0007 OH Kepala Tukang @Rp 130,000.00 Rp. 91.00
0.0004 OH Mandor @Rp 115,000.00 Rp. 46.00
Jumlah Rp. 15,167.00
Dibulatkan Rp. 15,167.00
SNI 7394-2008-6.20
1 M2 Bekisting Untuk Pondasi
0.0400 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 100,000.00
0.3000 Kg Paku Biasa @Rp 25,000.00 Rp. 7,500.00
0.1000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 4,945.00
0.5200 OH Pekerja @Rp 115,000.00 Rp. 59,800.00
0.2600 OH Tukang @Rp 125,000.00 Rp. 32,500.00
0.0260 OH Kepala Tukang @Rp 130,000.00 Rp. 3,380.00
0.0260 OH Mandor @Rp 115,000.00 Rp. 2,990.00
Jumlah Rp. 211,115.00
Dibulatkan Rp. 211,115.00

SNI 7394-2008-6.21
1 M2 Bekisting Untuk Sloof
0.0450 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 112,500.00
0.3000 Kg Paku Biasa @Rp 25,000.00 Rp. 7,500.00
0.1000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 4,945.00
0.5200 OH Pekerja @Rp 115,000.00 Rp. 59,800.00
0.2600 OH Tukang @Rp 125,000.00 Rp. 32,500.00
0.0260 OH Kepala Tukang @Rp 130,000.00 Rp. 3,380.00
0.0260 OH Mandor @Rp 115,000.00 Rp. 2,990.00
Jumlah Rp. 223,615.00
Dibulatkan Rp. 223,615.00

SNI 7394-2008-6.22
1 M2 Bekisting Untuk Kolom
0.0400 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 100,000.00
0.4000 Kg Paku Biasa @Rp 25,000.00 Rp. 10,000.00
0.2000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 9,890.00
0.0150 M3 Balok Kayu Kelas III @Rp 2,500,000.00 Rp. 37,500.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
2.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 15,120.00
0.6600 OH Pekerja @Rp 115,000.00 Rp. 75,900.00
0.3300 OH Tukang @Rp 125,000.00 Rp. 41,250.00
0.0330 OH Kepala Tukang @Rp 130,000.00 Rp. 4,290.00
0.0330 OH Mandor @Rp 115,000.00 Rp. 3,795.00
Jumlah Rp. 332,745.00
Dibulatkan Rp. 332,745.00

SNI 7394-2008-6.23
1 M2 Bekisting Untuk Balok
0.0400 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 100,000.00
0.4000 Kg Paku Biasa @Rp 25,000.00 Rp. 10,000.00
0.2000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 9,890.00
0.0180 M3 Balok Kayu Kelas III @Rp 2,500,000.00 Rp. 45,000.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
2.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 15,120.00
0.6600 OH Pekerja @Rp 115,000.00 Rp. 75,900.00
0.3300 OH Tukang @Rp 125,000.00 Rp. 41,250.00
0.0330 OH Kepala Tukang @Rp 130,000.00 Rp. 4,290.00
0.0330 OH Mandor @Rp 115,000.00 Rp. 3,795.00
Jumlah Rp. 340,245.00
Dibulat Rp. 340,245.00
SNI 7394-2008-6.24
1 M2 Bekisting Untuk Plat Lantai
0.0400 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 100,000.00
0.4000 Kg Paku Biasa @Rp 25,000.00 Rp. 10,000.00
0.2000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 9,890.00
0.0150 M3 Balok Kayu Kelas III @Rp 2,500,000.00 Rp. 37,500.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
6.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 45,360.00
0.6600 OH Pekerja @Rp 115,000.00 Rp. 75,900.00
0.3300 OH Tukang @Rp 125,000.00 Rp. 41,250.00
0.0330 OH Kepala Tukang @Rp 130,000.00 Rp. 4,290.00
0.0330 OH Mandor @Rp 115,000.00 Rp. 3,795.00
Jumlah Rp. 362,985.00
Dibulatkan Rp. 362,985.00

SNI 7394-2008-6.26
1 M2 Bekisting Untuk Tangga
0.0300 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 75,000.00
0.4000 Kg Paku Biasa @Rp 25,000.00 Rp. 10,000.00
0.1500 Liter Minyak Bekisting @Rp 49,450.00 Rp. 7,417.50
0.0150 M3 Balok Kayu Kelas III @Rp 2,500,000.00 Rp. 37,500.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
2.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 15,120.00
0.6600 OH Pekerja @Rp 115,000.00 Rp. 75,900.00
0.3300 OH Tukang @Rp 125,000.00 Rp. 41,250.00
0.0330 OH Kepala Tukang @Rp 130,000.00 Rp. 4,290.00
0.0330 OH Mandor @Rp 115,000.00 Rp. 3,795.00
Jumlah Rp. 305,272.50
Dibulatkan Rp. 305,272.50

Pekerjaan Lain-lain
Membongkar dan Menyiram Beton
1.0000 OH Pekerja @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 115,000.00

REKAPITULASI PEKERJAAN BETON


Suplemen 1
1 M3 Pondasi Tapak Beton Bertulang
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
105.2160 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 1,540,572.67
5.0000 M2 SNI 7394-2008-6.20 @Rp 211,115.00 Rp. 1,055,575.00
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 45,367,037.67
Dibulatkan Rp. 45,367,037.67

Suplemen 2
1 M3 Sloof Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
190.0464 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,782,659.39
2.2222 M2 SNI 7394-2008-6.21 @Rp 223,615.00 Rp. 496,922.22
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 46,050,471.61
Dibulatkan Rp. 46,050,471.61
Suplemen 3
1 M3 Balok Beton Bertulang Ukuran 30 x 50 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
176.7957 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,588,643.13
3.5333 M2 SNI 7394-2008-6.23 @Rp 340,245.00 Rp. 1,202,199.00
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 46,561,732.13
Dibulatkan Rp. 46,561,732.13

Suplemen 4
1 M3 Balok Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
183.9173 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,692,917.59
3.5833 M2 SNI 7394-2008-6.23 @Rp 340,245.00 Rp. 1,219,211.25
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 46,683,018.84
Dibulatkan Rp. 46,683,018.84

Suplemen 5
1 M3 Balok Beton Bertulang Ukuran 20 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
170.3235 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,493,876.69
4.7500 M2 SNI 7394-2008-6.23 @Rp 340,245.00 Rp. 1,616,163.75
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 46,880,930.44
Dibulatkan Rp. 46,880,930.44

Suplemen 6
1 M3 Balok Beton Bertulang Ukuran 25 x 30 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
133.5339 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 1,955,202.88
5.6667 M2 SNI 7394-2008-6.23 @Rp 340,245.00 Rp. 1,928,055.00
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 46,654,147.88
Dibulatkan Rp. 46,654,147.88

Suplemen 7
1 M3 Balok Latai Beton Bertulang Ukuran 13 x 15 Cm
1.0000 M3 SNI 7394-2008-6.7 @Rp 41,858,650.00 Rp. 41,858,650.00
247.3795 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 3,622,130.45
5.1282 M2 SNI 7394-2008-6.23 @Rp 340,245.00 Rp. 1,744,846.15
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 47,340,626.61
Dibulatkan Rp. 47,340,626.61

Suplemen 8
1 M3 Ring Balok Beton Bertulang Ukuran 13 x 15 Cm
1.0000 M3 SNI 7394-2008-6.7 @Rp 41,858,650.00 Rp. 41,858,650.00
247.3795 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 3,622,130.45
5.1282 M2 SNI 7394-2008-6.23 @Rp 340,245.00 Rp. 1,744,846.15
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 47,340,626.61
Dibulatkan Rp. 47,340,626.61

Suplemen 9
1 M3 Balok Ornamen Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
163.7783 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,398,042.36
6.0256 M2 SNI 7394-2008-6.23 @Rp 340,245.00 Rp. 2,050,194.23
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 47,219,126.59
Dibulatkan Rp. 47,219,126.59
Suplemen 10
1 M3 Lantai Beton Bertulang Ukuran T = 12 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
123.3000 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 1,805,358.60
4.1667 M2 SNI 7394-2008-6.24 @Rp 362,985.00 Rp. 1,512,437.50
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 46,088,686.10
Dibulatkan Rp. 46,088,686.10

Suplemen 11
1 M3 Plat Bordes dan Anak Tangga Beton Bertulang Ukuran T = 15 cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
142.0416 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,079,773.11
3.3333 M2 SNI 7394-2008-6.26 @Rp 305,272.50 Rp. 1,017,575.00
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 45,868,238.11
Dibulatkan Rp. 45,868,238.11

Suplemen 12
1 M3 Kolom Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
163.7783 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,398,042.36
1.9444 M2 SNI 7394-2008-6.22 @Rp 332,745.00 Rp. 647,004.17
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 45,815,936.52
Dibulatkan Rp. 45,815,936.52

Suplemen 13
1 M3 Kolom Beton Bertulang Ukuran 30 x 30 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
177.1547 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,593,898.63
2.2222 M2 SNI 7394-2008-6.22 @Rp 332,745.00 Rp. 739,433.33
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 46,104,221.96
Dibulatkan Rp. 46,104,221.96

Suplemen 14
1 M3 Kolom Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
137.4743 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,012,899.19
1.9444 M2 SNI 7394-2008-6.22 @Rp 332,745.00 Rp. 647,004.17
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 45,430,793.36
Dibulatkan Rp. 45,430,793.36

Suplemen 15
1 M3 Kolom Beton Bertulang Ukuran 30 x 30 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,655,890.00 Rp. 42,655,890.00
183.2991 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,683,865.58
2.2222 M2 SNI 7394-2008-6.22 @Rp 332,745.00 Rp. 739,433.33
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 46,194,188.92
Dibulatkan Rp. 46,194,188.92

Suplemen 16
1 M3 Kolom Beton Bertulang Ukuran 13 x 13 Cm
1.0000 M3 SNI 7394-2008-6.7 @Rp 41,858,650.00 Rp. 41,858,650.00
163.7783 Kg SNI 7394-2008-6.17 @Rp 14,642.00 Rp. 2,398,042.36
2.5641 M2 SNI 7394-2008-6.22 @Rp 332,745.00 Rp. 853,192.31
1.0000 Ls Pekerjaan Lain-lain @Rp 115,000.00 Rp. 115,000.00
Jumlah Rp. 45,224,884.66
Dibulatkan Rp. 45,224,884.66
IV. PEKERJAAN DINDING
SNI 6897-2008-6.7
1 M2 Pasangan Bata Merah Tebal 1/2 Bata Adukan 1PC : 2 PP
0.0380 M3 Pasir Pasang @Rp 500.00 Rp. 19.00
70.0000 Buah Batu Bata @Rp 660.00 Rp. 46,200.00
18.9500 Kg Semen Portland @Rp 71,000.00 Rp. 1,345,450.00
0.3000 OH Pekerja @Rp 115,000.00 Rp. 34,500.00
0.1000 OH Tukang @Rp 125,000.00 Rp. 12,500.00
0.0100 OH Kepala Tukang @Rp 130,000.00 Rp. 1,300.00
0.0150 OH Mandor @Rp 115,000.00 Rp. 1,725.00
Jumlah Rp. 1,441,694.00
Dibulatkan Rp. 1,441,694.00

SNI 6897-2008-6.9
1 M2 Pasangan Bata Merah Tebal 1/2 Bata Adukan 1PC : 4 PP
0.0430 M3 Pasir Pasang @Rp 500.00 Rp. 21.50
70.0000 Buah Batu Bata @Rp 660.00 Rp. 46,200.00
11.5000 Kg Semen Portland @Rp 71,000.00 Rp. 816,500.00
0.3000 OH Pekerja @Rp 115,000.00 Rp. 34,500.00
0.1000 OH Tukang @Rp 125,000.00 Rp. 12,500.00
0.0100 OH Kepala Tukang @Rp 130,000.00 Rp. 1,300.00
0.0150 OH Mandor @Rp 115,000.00 Rp. 1,725.00
Jumlah Rp. 912,746.50
Dibulatkan Rp. 912,746.00

V. PEKERJAAN PLESTERAN
SNI 2837-2008-6.2
1 M2 Plesteran 1 PC : 2 PP : Tebal 15 mm
0.0200 M3 Pasir Beton @Rp 15,000.00 Rp. 300.00
10.2240 Kg Semen Portland @Rp 71,000.00 Rp. 725,904.00
0.3000 OH Pekerja @Rp 115,000.00 Rp. 34,500.00
0.1500 OH Tukang @Rp 125,000.00 Rp. 18,750.00
0.0150 OH Kepala Tukang @Rp 130,000.00 Rp. 1,950.00
0.0150 OH Mandor @Rp 115,000.00 Rp. 1,725.00
Jumlah Rp. 783,129.00
Dibulatkan Rp. 783,129.00

SNI 2837-2008-6.3
1 M2 Plesteran 1 PC : 3 PP : Tebal 15 mm
0.0230 M3 Pasir Beton @Rp 15,000.00 Rp. 345.00
7.7760 Kg Semen Portland @Rp 71,000.00 Rp. 552,096.00
0.3000 OH Pekerja @Rp 115,000.00 Rp. 34,500.00
0.1500 OH Tukang @Rp 125,000.00 Rp. 18,750.00
0.0150 OH Kepala Tukang @Rp 130,000.00 Rp. 1,950.00
0.0150 OH Mandor @Rp 115,000.00 Rp. 1,725.00
Jumlah Rp. 609,366.00
Dibulatkan Rp. 609,366.00

SNI 2837-2008-6.4
1 M2 Plesteran 1 PC : 4 PP : Tebal 15 mm
0.0240 M3 Pasir Beton @Rp 15,000.00 Rp. 360.00
6.2400 Kg Semen Portland @Rp 71,000.00 Rp. 443,040.00
0.3000 OH Pekerja @Rp 115,000.00 Rp. 34,500.00
0.1500 OH Tukang @Rp 125,000.00 Rp. 18,750.00
0.0150 OH Kepala Tukang @Rp 130,000.00 Rp. 1,950.00
0.0150 OH Mandor @Rp 115,000.00 Rp. 1,725.00
Jumlah Rp. 500,325.00
Dibulatkan Rp. 500,325.00
SNI 2837-2008-6.27
1 M2 Acian
3.2500 Kg Semen Portland @Rp 71,000.00 Rp. 230,750.00
0.2000 OH Pekerja @Rp 115,000.00 Rp. 23,000.00
0.1000 OH Tukang @Rp 125,000.00 Rp. 12,500.00
0.0100 OH Kepala Tukang @Rp 130,000.00 Rp. 1,300.00
0.0100 OH Mandor @Rp 115,000.00 Rp. 1,150.00
Jumlah Rp. 268,700.00
Dibulatkan Rp. 268,700.00

VI. PEKERJAAN KAYU


SNI 3434-2008-6.1
Membuat dan Memasang 1 M3 Kusen Pintu dan Jendela Kayu Kelas I
1.1000 M3 Balok Kayu Kelas I @Rp 5,000,000.00 Rp. 5,500,000.00
1.0000 Kg Lem Kayu @Rp 177.78 Rp. 177.78
1.2500 Kg Paku Biasa @Rp 25,000.00 Rp. 31,250.00
7.0000 OH Pekerja @Rp 115,000.00 Rp. 805,000.00
21.0000 OH Tukang @Rp 125,000.00 Rp. 2,625,000.00
2.1000 OH Kepala Tukang @Rp 130,000.00 Rp. 273,000.00
0.3500 OH Mandor @Rp 115,000.00 Rp. 40,250.00
Jumlah Rp. 9,274,677.78
Dibulatkan Rp. 9,274,677.78

SNI 3434-2008-6.5
Membuat dan Memasang 1 M2 Daun Pintu Panel Kayu Kelas I
0.0400 M3 Papan Kayu Kelas I @Rp 5,000,000.00 Rp. 200,000.00
0.5000 Kg Lem Kayu @Rp 177.78 Rp. 88.89
1.0000 OH Pekerja @Rp 115,000.00 Rp. 115,000.00
3.0000 OH Tukang @Rp 125,000.00 Rp. 375,000.00
0.3000 OH Kepala Tukang @Rp 130,000.00 Rp. 39,000.00
0.0500 OH Mandor @Rp 115,000.00 Rp. 5,750.00
Jumlah Rp. 734,838.89
Dibulatkan Rp. 734,838.89

SNI 3434-2008-6.6
Membuat dan memasang 1 M2 Pintu dan Jendela Kaca Kayu Kelas I
0.0240 M3 Papan Kayu Kelas I @Rp 5,000,000.00 Rp. 120,000.00
0.3000 Kg Paku Biasa @Rp 25,000.00 Rp. 7,500.00
0.8000 OH Pekerja @Rp 115,000.00 Rp. 92,000.00
2.4000 OH Tukang @Rp 125,000.00 Rp. 300,000.00
0.2400 OH Kepala Tukang @Rp 130,000.00 Rp. 31,200.00
0.0400 OH Mandor @Rp 115,000.00 Rp. 4,600.00
Jumlah Rp. 555,300.00
Dibulatkan Rp. 555,300.00

SNI 3434-2008-6.10
Memasang 1 M2 Jalusi Kusen Kayu Kelas I
0.0600 M3 Papan Kayu Kelas I @Rp 5,000,000.00 Rp. 300,000.00
0.1500 Kg Paku Biasa @Rp 25,000.00 Rp. 3,750.00
0.6700 OH Pekerja @Rp 115,000.00 Rp. 77,050.00
2.0000 OH Tukang @Rp 125,000.00 Rp. 250,000.00
0.2000 OH Kepala Tukang @Rp 130,000.00 Rp. 26,000.00
0.3350 OH Mandor @Rp 115,000.00 Rp. 38,525.00
Jumlah Rp. 695,325.00
Dibulatkan Rp. 695,325.00
SNI 3434-2008-6.13
Memasang 1 M3 Kontruksi Kuda-Kuda Konvensional Kayu Kelas I
1.1000 M3 Balok Kayu Kelas I @Rp 5,000,000.00 Rp. 5,500,000.00
15.0000 Kg Besi Strip Tebal 5 mm @Rp 12,000.00 Rp. 180,000.00
5.6000 Kg Paku Biasa @Rp 25,000.00 Rp. 140,000.00
4.0000 OH Pekerja @Rp 115,000.00 Rp. 460,000.00
12.0000 OH Tukang @Rp 125,000.00 Rp. 1,500,000.00
1.2000 OH Kepala Tukang @Rp 130,000.00 Rp. 156,000.00
0.2000 OH Mandor @Rp 115,000.00 Rp. 23,000.00
Jumlah Rp. 7,959,000.00
Dibulatkan Rp. 7,959,000.00

SNI 3434-2008-6.15
Memasang 1 M3 Kontruksi Gordeng Kayu Kelas II
1.1000 M3 Balok Kayu Kelas II @Rp 3,000,000.00 Rp. 3,300,000.00
3.0000 Kg Paku Biasa @Rp 25,000.00 Rp. 75,000.00
2.4000 OH Pekerja @Rp 115,000.00 Rp. 276,000.00
7.2000 OH Tukang @Rp 125,000.00 Rp. 900,000.00
0.7200 OH Kepala Tukang @Rp 130,000.00 Rp. 93,600.00
0.1200 OH Mandor @Rp 115,000.00 Rp. 13,800.00
Jumlah Rp. 4,658,400.00
Dibulatkan Rp. 4,658,400.00

SNI 3434-2008-6.18
Memasang 1 M2 Rangka Langit - Langit 60 x 60, Kayu Kelas II
0.0154 M3 Kaso - Kaso / Kayu Klas II @Rp 3,000,000.00 Rp. 46,200.00
0.2000 Kg Paku Biasa @Rp 25,000.00 Rp. 5,000.00
0.1500 OH Pekerja @Rp 115,000.00 Rp. 17,250.00
0.3000 OH Tukang @Rp 125,000.00 Rp. 37,500.00
0.0300 OH Kepala Tukang @Rp 130,000.00 Rp. 3,900.00
0.0750 OH Mandor @Rp 115,000.00 Rp. 8,625.00
Jumlah Rp. 118,475.00
Dibulatkan Rp. 118,475.00

SNI 3434-2008-6.21
Memasang 1 M' Lisplank Ukuran (3 x 20) Cm, Kayu Kelas I
0.0108 M3 Papan Kayu Klas I @Rp 3,000,000.00 Rp. 32,400.00
0.1000 Kg Paku Biasa @Rp 25,000.00 Rp. 2,500.00
0.1000 OH Pekerja @Rp 115,000.00 Rp. 11,500.00
0.2000 OH Tukang @Rp 125,000.00 Rp. 25,000.00
0.0200 OH Kepala Tukang @Rp 130,000.00 Rp. 2,600.00
0.0050 OH Mandor @Rp 115,000.00 Rp. 575.00
Jumlah Rp. 74,575.00
Dibulatkan Rp. 74,575.00

VII. PEKERJAAN PENUTUP LANTAI DAN DINDING


SNI 7395-2008-6.36
Memasang 1 M2 Lantai Keramik Ukuran 20 x 20 Cm Unpolished
0.0450 M3 Pasir Pasang @Rp 500.00 Rp. 22.50
26.5000 Buah Keramik 20 x 20 cm Unpolished @Rp 2,500.00 Rp. 66,250.00
10.4000 Kg Semen Portland @Rp 71,000.00 Rp. 738,400.00
1.6200 Kg Semen Warna @Rp 54,000.00 Rp. 87,480.00
0.2700 OH Pekerja @Rp 115,000.00 Rp. 31,050.00
0.1350 OH Tukang @Rp 125,000.00 Rp. 16,875.00
0.0140 OH Kepala Tukang @Rp 130,000.00 Rp. 1,820.00
0.0140 OH Mandor @Rp 115,000.00 Rp. 1,610.00
Jumlah Rp. 943,507.50
Dibulatkan Rp. 943,507.50
SNI 7395-2008-6.54
1 M2 Dinding Keramik 20 x 25 Cm
0.0180 M3 Pasir Pasang @Rp 500.00 Rp. 9.00
26.5000 Buah Keramik 20 x 25 cm @Rp 3,000.00 Rp. 79,500.00
9.3000 Kg Semen Portland @Rp 71,000.00 Rp. 660,300.00
1.9400 Kg Semen Warna @Rp 54,000.00 Rp. 104,760.00
0.9000 OH Pekerja @Rp 115,000.00 Rp. 103,500.00
0.4500 OH Tukang @Rp 125,000.00 Rp. 56,250.00
0.0450 OH Kepala Tukang @Rp 130,000.00 Rp. 5,850.00
0.0450 OH Mandor @Rp 115,000.00 Rp. 5,175.00
Jumlah Rp. 1,015,344.00
Dibulatkan Rp. 1,015,344.00

SNI 7395-2008-6.34a
Memasang 1 M2 Lantai Keramik 40 x 40 Cm
0.0450 M3 Pasir Pasang @Rp 500.00 Rp. 22.50
6.6300 Buah Keramik 40 x 40 cm Polished @Rp 8,000.00 Rp. 53,040.00
9.8000 Kg Semen Portland @Rp 71,000.00 Rp. 695,800.00
1.3000 Kg Semen Warna @Rp 54,000.00 Rp. 70,200.00
0.7000 OH Pekerja @Rp 115,000.00 Rp. 80,500.00
0.3500 OH Tukang @Rp 125,000.00 Rp. 43,750.00
0.0350 OH Kepala Tukang @Rp 130,000.00 Rp. 4,550.00
0.0350 OH Mandor @Rp 115,000.00 Rp. 4,025.00
Jumlah Rp. 951,887.50
Dibulatkan Rp. 951,887.00

SNI7395-2008-6.15
Memasang 1 M2 Lantai Keramik 30 x 30 Cm Polished
0.0450 M3 Pasir Pasang @Rp 500.00 Rp. 22.50
11.8700 Buah Keramik 30 x 30 cm Unpolished @Rp 5,200.00 Rp. 61,724.00
10.0000 Kg Semen Portland @Rp 71,000.00 Rp. 710,000.00
1.5000 Kg Semen Warna @Rp 54,000.00 Rp. 81,000.00
0.2600 OH Pekerja @Rp 115,000.00 Rp. 29,900.00
0.1300 OH Tukang @Rp 125,000.00 Rp. 16,250.00
0.0130 OH Kepala Tukang @Rp 130,000.00 Rp. 1,690.00
0.0130 OH Mandor @Rp 115,000.00 Rp. 1,495.00
Jumlah Rp. 902,081.50
Dibulatkan Rp. 902,081.50

SNI7395-2008-6.15.a
Memasang 1 M2 Lantai Keramik 30 x 30 Cm Unpolished
0.0450 M3 Pasir Pasang @Rp 500.00 Rp. 22.50
11.8700 Buah Keramik 30 x 30 cm Unpolished @Rp 5,200.00 Rp. 61,724.00
10.0000 Kg Semen Portland @Rp 71,000.00 Rp. 710,000.00
1.5000 Kg Semen Warna @Rp 54,000.00 Rp. 81,000.00
0.2600 OH Pekerja @Rp 115,000.00 Rp. 29,900.00
0.1300 OH Tukang @Rp 125,000.00 Rp. 16,250.00
0.0130 OH Kepala Tukang @Rp 130,000.00 Rp. 1,690.00
0.0130 OH Mandor @Rp 115,000.00 Rp. 1,495.00
Jumlah Rp. 902,081.50
Dibulatkan Rp. 902,081.50
VIII. PEKERJAAN LANGIT-LANGIT
SNI 2839-2008-6.1
1 M2 Pasang Plafond Asbes Semen
1.1000 M2 Asbes Semen @Rp 15,000.00 Rp. 16,500.00
0.0100 Kg Paku @Rp 25,000.00 Rp. 250.00
0.0300 OH Pekerja @Rp 115,000.00 Rp. 3,450.00
0.0700 OH Tukang @Rp 125,000.00 Rp. 8,750.00
0.0070 OH Kepala Tukang @Rp 130,000.00 Rp. 910.00
0.0040 OH Mandor @Rp 115,000.00 Rp. 460.00
Jumlah Rp. 30,320.00
Dibulatkan Rp. 30,320.00

SNI 2839-2008-6.5
1 M2 Pasang Plafond Tripleks Tebal 4 mm
0.3750 Lembar Tripleks Tebal 4 mm @Rp 25,000.00 Rp. 9,375.00
0.0300 Kg Paku @Rp 20,000.00 Rp. 600.00
0.1000 OH Pekerja @Rp 115,000.00 Rp. 11,500.00
0.1000 OH Tukang @Rp 125,000.00 Rp. 12,500.00
0.0100 OH Kepala Tukang @Rp 130,000.00 Rp. 1,300.00
0.0050 OH Mandor @Rp 115,000.00 Rp. 575.00
Jumlah Rp. 35,850.00
Dibulatkan Rp. 35,850.00

SNI 2839-2008-6.10
1 M' Pasang List Langit - Langit Kayu Profil
1.0500 M' List Kayu Profil @Rp 5,000.00 Rp. 5,250.00
0.0100 Kg Paku Kayu Biasa @Rp 25,000.00 Rp. 250.00
0.0500 OH Pekerja @Rp 115,000.00 Rp. 5,750.00
0.0500 OH Tukang @Rp 125,000.00 Rp. 6,250.00
0.0050 OH Kepala Tukang @Rp 130,000.00 Rp. 650.00
0.0030 OH Mandor @Rp 115,000.00 Rp. 345.00
Jumlah Rp. 18,495.00
Dibulatkan Rp. 18,495.00

X. PEKERJAAN KUNCI DAN KACA


SNI 03-3431-2002-6.2
1 Buah Kunci Tanam Biasa
1.0000 Buah Kunci Tanam Biasa @Rp 240,000.00 Rp. 240,000.00
0.0100 OH Pekerja @Rp 115,000.00 Rp. 1,150.00
0.5000 OH Tukang @Rp 125,000.00 Rp. 62,500.00
0.0100 OH Kepala Tukang @Rp 130,000.00 Rp. 1,300.00
0.0050 OH Mandor @Rp 115,000.00 Rp. 575.00
Jumlah Rp. 305,525.00
Dibulatkan Rp. 305,525.00

SNI 03-3431-2002-6.5
1 Buah Engsel Pintu
1.0000 Psg Engsel Pintu @Rp 12,650.00 Rp. 12,650.00
0.0150 OH Pekerja @Rp 115,000.00 Rp. 1,725.00
0.1500 OH Tukang @Rp 125,000.00 Rp. 18,750.00
0.0150 OH Kepala Tukang @Rp 130,000.00 Rp. 1,950.00
0.0008 OH Mandor @Rp 115,000.00 Rp. 86.25
Jumlah Rp. 35,161.25
Dibulatkan Rp. 35,161.25
SNI 03-3431-2002-6.6
1 Buah Engsel Jendela Kupu - Kupu
1.0000 Psg Engsel Jendela @Rp 10,000.00 Rp. 10,000.00
0.0100 OH Pekerja @Rp 115,000.00 Rp. 1,150.00
0.1000 OH Tukang @Rp 125,000.00 Rp. 12,500.00
0.0100 OH Kepala Tukang @Rp 130,000.00 Rp. 1,300.00
0.0005 OH Mandor @Rp 115,000.00 Rp. 57.50
Jumlah Rp. 25,007.50
Dibulatkan Rp. 25,007.50
SNI 03-3431-2002-6.9
1 Buah Kait Angin Jendela
1.0000 Buah Kait Angin @Rp 10,000.00 Rp. 10,000.00
0.0150 OH Pekerja @Rp 115,000.00 Rp. 1,725.00
0.1500 OH Tukang @Rp 125,000.00 Rp. 18,750.00
0.0150 OH Kepala Tukang @Rp 130,000.00 Rp. 1,950.00
0.0008 OH Mandor @Rp 115,000.00 Rp. 86.25
Jumlah Rp. 32,511.25
Dibulatkan Rp. 32,511.25

SNI 03-3431-2002-6.17
1 M2 Pasang Kaca Tebal 5 mm
1.1000 M2 Kaca Tebal 5 mm @Rp 57,500.00 Rp. 63,250.00
0.0150 OH Pekerja @Rp 115,000.00 Rp. 1,725.00
0.1500 OH Tukang @Rp 125,000.00 Rp. 18,750.00
0.0150 OH Kepala Tukang @Rp 130,000.00 Rp. 1,950.00
0.0008 OH Mandor @Rp 115,000.00 Rp. 86.25
Jumlah Rp. 85,761.25
Dibulatkan Rp. 85,761.25

XI. PEKERJAAN PENGECATAN


SNI 03-2839-2002-6.8
1 M2 Pengecatan Bidang Kayu Baru
0.2000 Kg Cat Meni @Rp 21,000.00 Rp. 4,200.00
0.1500 Kg Plamir @Rp 78.57 Rp. 11.79
0.1700 Kg Cat Dasar @Rp 20,000.00 Rp. 3,400.00
0.2600 Kg Cat Kayu 2 Kali @Rp 44,000.00 Rp. 11,440.00
0.0700 OH Pekerja @Rp 115,000.00 Rp. 8,050.00
0.0090 OH Tukang @Rp 125,000.00 Rp. 1,125.00
0.0060 OH Kepala Tukang @Rp 130,000.00 Rp. 780.00
0.0025 OH Mandor @Rp 115,000.00 Rp. 287.50
Jumlah Rp. 29,294.29
Dibulatkan Rp. 29,294.00
SNI 03-2839-2002-6.14
1 M2 Pengecatan Bidang Tembok Baru
0.1000 Kg Plamir @Rp 78.57 Rp. 7.86
0.1000 Kg Cat Dasar @Rp 20,000.00 Rp. 2,000.00
0.2600 Kg Cat Tembok 2 Kali @Rp 20,000.00 Rp. 5,200.00
0.0200 OH Pekerja @Rp 115,000.00 Rp. 2,300.00
0.0630 OH Tukang @Rp 125,000.00 Rp. 7,875.00
0.0063 OH Kepala Tukang @Rp 130,000.00 Rp. 819.00
0.0025 OH Mandor @Rp 115,000.00 Rp. 287.50
Jumlah Rp. 18,489.36
Dibulatkan Rp. 18,489.00
LAMPIRAN PERHITUNGAN KILOGRAM BESI PER METER KUBIT BETON

Besi Berat Vol. Beton Panjang Jumlah Jumlah S Jumlah Jumlah


No. Uraian (ø) (kg) M3 M' (Btg) Volume Volume Berat
(Kg) (Kg) (Kg/m3)

1 Pondasi
ø16 1.578 1.000 10.000 15.782
0.300 31.565 105.216
ø 16 1.578 1.000 10.000 15.782

1 Sloof 30/40
ø16 1.578 1.000 12.000 18.939
0.120 22.806 190.046
ø8 0.395 1.400 7.000 3.867

2 Kolom 30/40
ø16 1.578 1.000 4.000 6.313
0.120 19.653 163.778
ø8 0.395 1.400 7.000 3.871

ø16 1.578 1.000 6.000 9.469

3 Kolom 30/30
ø16 1.578 1.000 4.000 6.313
0.090 15.944 177.155
ø8 0.395 1.200 7.000 3.318

ø16 1.578 1.000 4.000 6.313


4 Kolom 30/40
ø16 1.578 1.000 8.000 12.626
0.120 16.497 137.474
ø8 0.395 1.400 7.000 3.871
5 Kolom 30/30
ø16 1.578 1.000 8.000 12.626
0.090 16.497 183.299
ø8 0.395 1.400 7.000 3.871
6 Kolom Praktis 13/13
ø10 0.617 1.000 4.000 2.466
0.017 3.793 224.450
ø8 0.395 0.480 7.000 1.327

7 Balok 30/50
ø16 1.578 1.000 10.000 15.782
0.150 26.519 176.796
ø8 0.395 1.600 7.000 4.424

ø16 1.578 1.000 4.000 6.313

8 Balok 30/40
ø16 1.578 1.000 10.000 15.782
0.120 22.070 183.917
ø8 0.395 1.400 7.000 3.871

ø14 1.208 1.000 2.000 2.417

9 Balok 20/40
ø16 1.578 1.000 5.000 7.891
0.080 13.626 170.324
ø8 0.395 1.200 7.000 3.318

ø14 1.208 1.000 2.000 2.417


Besi Berat Vol. Beton Panjang Jumlah Jumlah S Jumlah Jumlah
No. Uraian (ø) (kg) M3 M' (Btg) Volume Volume Berat
(Kg) (Kg) (Kg/m3)

10 Balok 25/30
ø14 1.208 1.000 4.000 4.833
0.075 10.015 133.534
ø8 0.395 1.000 7.000 2.765

ø14 1.208 1.000 2.000 2.417

11 Balok Latai 13/15


ø12 0.888 1.000 4.000 3.552
0.020 4.824 247.379
ø8 0.395 0.460 7.000 1.272

12 Ring Balok 13/15


ø12 0.888 1.000 4.000 3.552
0.020 4.824 247.379
ø8 0.395 0.460 7.000 1.272

13 Balok Ornamen 30/40


ø16 1.578 1.000 10.000 15.782
0.120 19.653 163.778
ø8 0.395 1.400 7.000 3.871

14 Plat lantai T = 12 cm
ø10 0.617 1.000 12.000 7.398
0.120 14.796 123.300
ø10 0.617 1.000 12.000 7.398

15 Plat Bordes T = 15 cm
ø12 0.888 1.000 12.000 10.653
0.150 21.306 142.042
ø12 0.888 1.000 12.000 10.653

0
0
Sinabang, 04 Mei 2017
CV. DAMAI FAAKHI-AKHI

0
0
PERHITUNGAN VOLUME

PEKERJAAN : PEMBANGUNAN RUMAH BIDAN DAN PENATAAN HALAMAN PUSKESMAS SANGGIRAN (OTSUS)
LOKASI : KABUPATEN SIMEULUE
### ###
#REF!

Lebar Lebar Jumlah


No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan

III. PEMBANGUAN RUANG KELAS BLOCK C


### PEKERJAAN TANAH DAN PASIR
### Galian Tanah Pondasi Tapak Type I 2.200 2.200 1.650 20.000 159.720 M3 174.635 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 20.000 14.915 M3
174.635 M3

### Galian Tanah Pondasi Tapak Type II 1.700 1.700 1.650 16.000 76.296 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 16.000 11.932 M3
2.000 1.700 1.650 1.000 5.610 M3
93.838 M3 93.838 M3

### Galian Tanah Pondasi Menerus 104.000 0.400 0.450 18.720 M3 18.720 M3

### Urugan Tanah 1/4 x Galian 71.798 M3 71.798 M3

### Urugan Pasir di bawah Pondasi 104.000 0.400 0.050 2.080 M3 9.402 M3
2.200 2.200 0.050 20.000 4.840 M3
1.700 1.700 0.050 16.000 2.312 M3
2.000 1.700 0.050 1.000 0.170 M3
9.402 M3

### Pondasi Batu Kali 1 : 4 104.000 0.250 0.400 0.200 0.300 10.400 M3 10.400 M3

### Cincin Sumur 2.000 20.000 40.000 M3


2.000 16.000 32.000 M3
72.000 M3 72.000 M3

### Beton Cor 1 : 2 : 3 Isian Sumuran 0.785 1.000 3.140 0.500 20.000 15.700 M3
0.785 1.000 3.140 0.500 16.000 12.560 M3
28.260 M3 28.260 M3

### Lantai Kerja di bawah Pondasi Tapak 2.200 2.200 0.100 20.000 9.680 M3
1.700 1.700 0.100 16.000 4.624 M3
2.000 1.700 0.100 1.000 0.340 M3
14.644 M3 14.644 M3

### PEKERJAAN BETON/BETON BERTULANG


### Beton Bertulang Pondasi Tapak 2.000 2.000 0.300 20.000 24.000 M3
1.500 1.500 0.300 16.000 10.800 M3
2.000 1.500 0.300 0.900 M3
35.700 M3 35.700 M3

### Beton Bertulang Kolom Pendestal 30/40 cm 0.400 0.300 1.450 20.000 3.480 M3
0.400 0.300 1.450 6.000 1.044 M3
4.524 M3 4.524 M3

### Beton Bertulang Kolom Pendestal 30/30 cm 0.300 0.300 1.450 10.000 1.305 M3 1.305 M3

### Beton Bertulang Sloof 30/40 cm 0.300 0.400 163.800 19.656 M3 19.656 M3

### Beton Bertulang Kolom Induk 30/40 cm 0.300 0.400 3.500 26.000 10.920 M3 10.920 M3

### Beton Bertulang Kolom Teras 30/30 cm 0.300 0.300 3.600 10.000 3.240 M3 3.240 M3

### Beton Bertulang Balok 30/50 cm 0.300 0.500 28.000 4.200 M3 4.200 M3

### Beton Bertulang Balok 30/40 cm 0.300 0.400 171.800 20.616 M3 20.616 M3

### Beton Bertulang Balok 20/40 cm 0.200 0.400 4.500 0.360 M3 0.360 M3

### Beton Bertulang Balok Latai 13/15 cm 0.130 0.150 70.000 1.365 M3 1.365 M3

### Beton Bertulang Ring Balok untuk selasar 13/15 cm 0.130 0.150 44.000 0.858 M3 0.858 M3

### Beton Bertulang Balok Ornamen Teras 30/40 cm 0.400 0.300 0.400 12.000 0.576 M3 0.576 M3

### Beton Bertulang Plat Lantai t = 12 cm 36.000 9.000 0.120 38.880 M3


4.000 4.000 0.120 1.920 M3
40.800 M3
Dikurangi balok Memajang 144.000 0.300 0.120 5.184 M3
Dikurangi balok Melintang 72.000 0.300 0.120 2.592 M3
7.776 M3
33.024 M3 33.024 M3

### Beton Bertulang Plat Bordes dan Anak Tangga 6.700 2.000 0.150 2.010 M3
4.000 3.000 0.150 1.800 M3
3.810 M3 3.810 M3
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
LANTAI II
### Beton Bertulang Kolom Induk 30/40 cm 3.700 0.300 0.400 26.000 11.544 M3 11.544 M3

### Beton Bertulang Kolom Teras 30/30 cm 3.700 0.300 0.300 10.000 3.330 M3 3.330 M3

### Beton Bertulang Balok 25/30 cm 125.000 0.250 0.300 1.000 9.375 M3 9.375 M3

### Beton Bertulang Balok Latai 13/15 cm 72.800 0.130 0.150 1.000 1.420 M3 1.420 M3

### Beton Bertulang untuk selasar 13/15 cm (dudukan batu bata) 44.000 0.130 0.150 1.000 0.858 M3 0.858 M3

### #REF!
LANTAI I
### Pasangan Trasram Bata 1 PC : 2 PS di bawah Lantai 95.300 0.400 38.120 M2
38.120 M2 38.120 M2

2 Plesteran Trasram Bata 1 PC : 2 PS di bawah Lantai 76.240 M2 76.240 M2

### Pasangan Dinding Bata 1 PC : 4 PS 104.400 3.350 349.740 M2


3.700 3.350 12.395 M2
362.135 M2
Dikurangi Jendela, Pintu
Pintu Type. P-1 Bagian Lantai bawah 2.600 1.300 4.000 13.520 M2
Jendela Type J-1 Bagian Lantai bawah 2.650 1.400 12.000 44.520 M2
Jendela Type J-12 Bagian Lantai bawah 2.000 1.400 4.000 11.200 M2
69.240 M2
Pas. Batu Bata Dikurangi Pintu, Jendela, kolom,dll 292.895 M2 292.895 M2
Pasangan Batu Bata lantai atas dan Bawah

4 Plesteran Dinding Bata 1 PC : 4 PS Pleteran Dikurangi 585.790 M1 585.790 M1

5 #REF!

#REF!
### Pasangan Dinding Bata 1 PC : 4 PS 85.600 3.550 303.880 M2 M2
3.700 3.550 13.135 M2
303.880 M2
Dikurangi
Pas. Batu Kerawang Bagian Lantai atas 2.000 1.660 1.000 3.320 M2
Pintu Type. P-1 Bagian Lantai bawah 2.600 1.300 4.000 13.520 M2
Jendela Type J-1 Bagian Lantai bawah 2.650 1.400 12.000 44.520 M2
Jendela Type J-12 Bagian Lantai bawah 2.000 1.400 4.000 11.200 M2
72.560 M2
Pas. Batu Bata Dikurangi Pintu, Jendela, kolom,dll 231.320 M2

### Plesteran Dinding Bata 1 PC : 4 PS - M2 M2

E. PEKERJAAN LANTAI
Pekerjaan Timbunan dan Urugan
1 Timbunan Tanah Bawah Lantai Ruangan 8.870 6.870 0.620 4.000 151.124 M3 151.124 M3
4.370 6.870 0.620 1.000 18.614 M3
169.737 M3

2 Timbunan Tanah di Bawah Selasar 40.000 1.370 0.570 31.236 M3


40.000 1.870 0.570 42.636 M3
10.370 1.370 0.570 2.000 16.196 M3
90.068 M3 90.068 M3

3 Urugan Pasir di Bawah Lantai Ruangan 8.870 6.870 0.100 4.000 24.375 M3 24.375 M3
4.370 6.870 0.100 1.000 3.002 M3
27.377 M3

4 Urugan Pasir di Bawah Lantai Selasar 40.000 1.370 0.100 5.480 M3


40.000 1.870 0.100 7.480 M3
10.370 1.370 0.100 2.000 2.841 M3
15.801 M3 15.801 M3
#REF!
### Beton Tumbuk di Bawah Lantai Keramik t = 5 cm Ruangan 8.870 6.870 0.050 4.000 12.187 M3 13.688 M3
4.370 6.870 0.050 1.000 1.501 M3
13.688 M3

### Beton Tumbuk di Bawah Lantai Keramik t = 5 cm Selasar 40.000 1.370 0.050 2.740 M3
40.000 1.870 0.050 3.740 M3
10.370 1.370 0.050 2.000 1.421 M3
7.901 M3 7.901 M3

### Lantai Keramik 40 x 40 cm Ruangan 8.870 6.870 4.000 243.748 M2 273.770 M2


4.370 6.870 1.000 30.022 M2
273.770 M2

### Lantai Keramik 40 x 40 cm Anti Slip Pada Selasar 40.000 1.370 54.800 M2
40.000 1.870 74.800 M2
10.370 1.370 2.000 28.414 M2
158.014 M2 158.014 M2
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
### #REF! 2.000 0.200 20.000 8.000 M2
2.000 0.300 20.000 12.000 M2
3.500 4.000 1.000 14.000 M2
34.000 M2 34.000 M2

7 #REF! 6.000 M3 6.000 M3

#REF!
1 #REF! 8.870 6.870 4.000 243.748 M3 M3
4.500 2.000 9.000

2 #REF! 40.000 2.000 80.000 M2 M2


4.500 2.000 9.000 M2
89.000 M2

3 #REF! 4.000 M2 M2

### #REF!
#REF!
### Kayu Kanopi Kuda-kuda Terpasang 10.000 Bh 10.000 Bh

2 Memasang Gording Kayu 120.000 0.050 0.050 0.300 M3 0.300 M3

3 Memasang Atap Genteng Metal 42.000 1.800 75.600 M2 75.600 M2

4 Kayu Listplank Uk. 3/20 cm 42.000 42.000 M' 42.000 M'

5 #REF! 6.870 8.870 4.000 243.748 M2


39.870 1.870 74.557 M2
39.870 1.200 47.844 M2
Plafond Dikurangi 366.149 M2 366.149 M2
M' - M'
6 #REF! 6.870 8.870 4.000 243.748 M2
39.870 1.870 74.557 M2
39.870 1.200 47.844 M2
jumlah 366.149 M2 366.149 M2

### #REF! jumlah - 366.149 M2 366.149 M2


14.646
#REF!
### Rangka Kuda-Kuda dan Gording Zincalume Type 100, 35.250 7.650 28.400 42.100 2.000 539.325
Penutup Atap dan Rabung Genteng Metal + Terpasang (SNI) 11.880 7.650 0.500 2.000 90.882
630.207 M2 M2

### Kayu Listplank Uk. 3/20 cm 107.960 0.250 26.990 M2 M2

### #REF! 6.870 8.870 4.000 243.748 M2


102.000 1.000 102.000 M2
39.870 1.870 74.557 M2
Plafond Dikurangi 420.305 M2 M2

### #REF! Pleteran Dikurangi - 420.305 M2 M2

### #REF! 31.080 4.000 124.320 M' M'


182.000 182.000 M'
306.320 M'
12.253
G. PEKERJAAN PINTU, JENDELA DAN KUNCI
1 Pintu Type P1
a. Kosen Kayu 5/13 7.600 0.130 0.050 4.000 0.198 M³ 0.198 M³

b. Daun Pintu Panel Ukuran 60 x 210 cm x 2 2.100 1.200 8.000 20.160 M² 20.160 M²

c. Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.070 8.000 1.008 M² 1.008 M²

d. Kunci Tanam Bulat 4.000 Buah 4.000 Buah

e. Pegangan Pintu 4.000 Buah 4.000 Buah

f. Engsel Pintu 12.000 12.000 Psg 12.000 Psg

g. Engsel Ventilasi 8.000 8.000 Psg 8.000 Psg

h. Hak Angin Jendela / Ventilasi 16.000 16.000 Buah 16.000 Buah

i. Grendel Ventilasi 8.000 8.000 Buah 8.000 Buah

j. Tarikan Jendela 8.000 8.000 Buah 8.000 Buah

h. Kaca 5 mm 0.300 0.500 8.000 1.200 M2 1.200 M2


Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
### Jendela Ambang Kaca Type J1 (24 Unit)
### Kosen Kayu 5/13 14.950 0.130 0.050 12.000 1.166 #REF! 1.166 #REF!

### Daun Jendela Ukuran 60 x 85 cm 2.700 0.130 0.050 48.000 0.842 #REF! 0.842 #REF!

### Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.130 0.050 48.000 0.562 #REF! 0.562 #REF!

### Engsel Jendela 48.000 #REF! 48.000 #REF!

### Engsel Ventilasi 48.000 #REF! 48.000 #REF!

### Grendel Jendela / Ventilasi 96.000 #REF! 96.000 #REF!

### Hak Angin Jendela / Ventilasi 192.000 #REF! 192.000 #REF!

### Tarikan Jendela 96.000 #REF! 96.000 #REF!

### #REF! 0.300 0.500 48.000 7.200 M2


0.750 0.500 48.000 18.000
25.200 M2 25.200 M2

3 Jendela Ambang Kaca Type J1 (4 Unit)


a. Kosen Kayu 5/13 11.600 0.130 0.050 4.000 0.302 M³ 0.302 M³

b. Daun Jendela Ukuran 85 x 90 cm 2.700 0.130 0.050 12.000 0.211 M2 0.211 M2

c. Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.130 0.050 12.000 0.140 M2 0.140 M2

d. Engsel Jendela 12.000 Psg 12.000 Psg

e. Engsel Ventilasi 12.000 Psg 12.000 Psg

f. Grendel Jendela / Ventilasi 24.000 Buah 24.000 Buah

g. Hak Angin Jendela / Ventilasi 48.000 Buah 48.000 Buah

h. Tarikan Jendela 24.000 Buah 24.000 Buah

i. Kaca 5 mm 0.300 0.500 12.000 1.800


0.750 0.500 12.000 4.500
6.300 M2 6.300 M2
### #REF!
### Armatur
- Lampu HE 18 Watt Setara Hannoch 112.000 112.000
### Stop Kontak 16.000 16.000
### Instalasi titik penerangan, instalasi termasuk kabel 112.000 112.000
NYA 3 x 2.5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang
### Instalasi titik kontak, instalasi termasuk kabel 16.000 16.000
NYA 3 x 2.5 mm dalam pipa PVC, kotak stop kontak
BROCO dan kelengkapan instalasi terpasang
### #REF!
#REF! -
#REF! 10.000 10.000

### #REF!
### #REF! 40.200 630.000 655.860 1,326.060 M2 1,326.060 M2

### #REF! 366.149 M2 366.149 M2

### Cat Kayu Lesplang dan Lis Plafond 42.000 0.210 8.820 M2 8.820 M2

### Cat Mengkilat Kosen, Daun Pintu, Jendela dan Jelusi


Kosen P1 1.727 4.000 6.908 M2
P2 2.100 1.200 2.000 4.000 16.800 M2
J1 3.292 4.000 13.168 M2
J2 4.329 1.000 4.329 M2
41.205 M2 41.205 M2

-
-
Sinabang, 04 Mei 2017
CV. DAMAI FAAKHI-AKHI

-
-
GRAND TOTAL REKAPITULASI
PEKERJAAN :
PEMBANGUNAN RUMAH BIDAN DAN PENATAAN HALAMAN PUSKESMAS SANGGIRAN (OTSUS)

Lokasi : #REF!

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

A. PEKERJAAN PERSIAPAN Rp. 13,700,000.00

#REF! #REF! Rp. #REF!

III. PEMBANGUAN RUANG KELAS BLOCK C Rp. #REF!

(A) JUMLAH HARGA PEKERJAAN Rp. #REF!


(B) PPN 10 % Rp. #REF!
(C) TOTAL HARGA PEKERJAAN Rp. #REF!
(D) JUMLAH TOTAL DIBULATKAN Rp. #REF!

Terbilang : ###

Banda Aceh, 12 Agustus 2015


CV. BUDI PRIMA SENTOSA

FAHMI
Direktur
Lampiran Alat

Jumlah Status
Peralatan Tahun Kepemilikan
No Jenis Peralatan Merk dan Type Pembuatan Tenaga Kapasitas Lokasi Alat
(unit) Peralatan

1 Generator Set 1 Honda 2015 - 10 Kva Milik Meureudu

2 Pick Up 2 Mitsubishi 2015 - 2 M3 Milik Meureudu

3 Scafolding 30 Set Pabrikasi 2016 - - Milik Meureudu

4 Peralatan Tukang 1 Pabrikasi 2016 - - Milik Meureudu

Banda Aceh, 10 Agustus 2017


PT. ALEX BUANA

Rudi
Manager Peralatan
REKAPITULASI BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN GEDUNG FAKULTAS KEPERAWATAN UNIVERSITAS SYIAH KUALA TAHAP I
LOKASI : KOPELMA DARUSSALAM
TAHUN ANGGARAN : 2017

JUMLAH HARGA
NO URAIAN PEKERJAAN
(RP)
1 2 3
I. PEKERJAAN PERSIAPAN Rp -

Total I Rp -

II. PEKERJAAN LANTAI I

A PEKERJAAN TANAH DAN PONDASI Rp -

B PEKERJAAN BETON BERTULANG #REF!

C PEKERJAAN TANGGA #REF!

D PEKERJAAN PASANGAN DAN PLASTERAN (DINDING BATA) #REF!

E PEKERJAAN DINDING PARTISI Rp -

F PEKERJAAN KUSEN, PINTU, JENDELA & VENTILASI Rp -

G PEKERJAAN PLAFOND Rp -

H PEKERJAAN LANTAI DAN DINDING Rp -

II. PEKERJAAN SANITAIR Rp -

J PEKERJAAN MEKANIKAL ELEKTRIKAL Rp -

K PEKERJAAN PENGECATAN Rp -

Total II #REF!

III. PEKERJAAN LANTAI II

A PEKERJAAN BETON BERTULANG #REF!

B PEKERJAAN TANGGA #REF!

C PEKERJAAN PASANGAN DAN PLESTERAN (DINDING BATA) #REF!

D PEKERJAAN DINDING PARTISI #REF!

E PEKERJAAN KUSEN, PINTU, JENDELA & VENTILASI #REF!

F PEKERJAAN PLAFOND #REF!

G PEKERJAAN LANTAI DAN DINDING #REF!

H PEKERJAAN SANITAIR #REF!

I PEKERJAAN MEKANIKAL ELEKTRIKAL #REF!

J PEKERJAAN PENGECATAN #REF!

Total II #REF!

IV. PEKERJAAN LANTAI III

A PEKERJAAN BETON BERTULANG #REF!

B PEKERJAAN PASANGAN DAN PLESTERAN (DINDING BATA) #REF!

C PEKERJAAN DINDING PARTISI #REF!


D PEKERJAAN KUSEN, PINTU, JENDELA & VENTILASI #REF!

E PEKERJAAN ATAP DAN PLAFOND #REF!

F PEKERJAAN LANTAI DAN DINDING #REF!

G PEKERJAAN SANITAIR #REF!

H PEKERJAAN MEKANIKAL ELEKTRIKAL #REF!

I PEKERJAAN PENGECATAN #REF!

Total IV #REF!

V. PEKERJAAN LAIN LAIN

A PEKERJAAN PASANGAN Rp -

B PEKERJAAN RELIF Rp -

C PEKERJAAN TRAB TANGGA Rp -

D PEMBERSIHAN AKHIR #REF!

Total V #REF!

TOTAL #REF!

PPN 10% #REF!

GRAND TOTAL #REF!

DIBULATKAN #REF!

Terbilang : #REF!

Banda Aceh, 04 April 2018


Penawar
……………………………..
………………………………..
Direktur Utama
KODE NETWORK PLANNING
PEKERJAAN : PENINGKATAN DERMAGA RAKYAT DESA LAMEREM KAB. SIMEULUE (DOKA)
LOKASI : KABUPATEN SIMEULUE
TAHUN ANGGARAN : 2018

DURASI / WAKTU
NO URAIAN PEKERJAAN
(HARI)
1 3

I. PEKERJAAN PERSIAPAN
I.1 Mobilisasi 5
I.1.a Demobilisasi 4
I.2 Pengukuran 40
I.3 Bangunan Direksi Keet dan Barak Kerja 180
I.4 Papan Nama Proyek 1
I.5 Dokumentasi/Administrasi/As Built Drawing 180
II. PEKERJAAN TANAH DAN PONDASI ###
II.1 Galian Pelebaran Kolam Dan Galian Sendimen Pendangkalan 27
II.2 Timbunan Tanah Pilihan ( didatangkan ) 12
II.3 Pekerjaan Cerucuk Bambu T=1 m' ( terpancang ) 4
II.4 Lantai Kerja Beton Cor t= 15 cm ( Kolom ) 2
II.5 Pasangan Pondasi batu belah 1 PC : 4 PP ( Talud ) 28
III. PEKERJAAN BETON BERTULANG ###
III.1 Pek. Tiang Kolom Uk.20/30 cm 14
III.2 Pek. Balok Bawah Uk. 20/25 cm 13
III.3 Pek. Balok Atas Uk. 20/40 cm 20
III.4 Pek. Cincin Beton Bertulang, Ø 110 cm, tinggi 80 cm, tebal 10 cm dan Ø 80 cm, tinggi 60 cm tebal 10 cm 26
III.5 Pembuatan Mal/ Bekisting Cincin Beton Dari Kayu 7
IV. PEKERJAAN PASANGAN DAN PLESTERAN ###
IV.1 Acian Balok Atas 1 PC : 4 PP . 13
V. PEKERJAAN LANTAI BETON PADA JALAN ###
V.1 Beton cor Pada Jalan Dan Doking Perahu 22
VI. PEKERJAAN PENGECATAN ###
VI.1 Cat Tembok 4
VII. PENGADAAN DAN PASANGAN LAMPU SOLAR CELL ###
VII.1 - Solar Panel 2 x 100 WP Policristaline + Dudukan/ Braket 13
- MPPT Solar Charge Controler 20 A
- Battery VRLA 100AH/12V ###
- Lampu PJU Multi LED 40 Watt ###
- Box Battery ###
- Tiang Lampu PJU Pipa Galvanis Bermotif tinggi 8 M
- Instalasi Kabel + Aksesoris + Terpasang ###
VIII PEKERJAAN LAIN - LAIN ###
VIII.1 Pengadaan dan Pasangan Bolder ( Pabrikasi Lokal ) 73
BILL OF QUANTITY (BQ)
REKAPITULASI BIAYA

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KESEHATAN


PEKERJAAN : PEMBANGUNAN RUMAH BIDAN DAN PENATAAN HALAMAN PUSKESMAS SANGGIRAN (OTSUS)
LOKASI : KABUPATEN SIMEULUE
TAHUN ANGGARAN : 2017

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)

A. PEKERJAAN PERSIAPAN Rp. 13,700,000.00


B. PEKERJAAN TANAH DAN PONDASI Rp. #REF!
C. PEKERJAAN BETON BERTULANG Rp. #REF!
D. PEKERJAAN PASANGAN DAN PLASTERAN Rp. 108,333,766.62
E. PEKERJAAN LANTAI Rp. 51,242,474.87
F. PEKERJAAN ATAP DAN PLAFOND Rp. 81,710,132.83
G. PEKERJAAN PINTU JENDELA DAN KUNCI Rp. 92,183,652.32
H. PEKERJAAN PENGECATAN Rp. 27,910,732.98
I. PEKERJAAN INSTALASI LISTRIK Rp. 19,075,000.00
J. PEKERJAAN INSTALASI AIR BERSIH Rp. 17,700,000.00
K. PEKERJAAN PENATAAN HALAMAN Rp. 61,912,164.50
L. PEKERJAAN INSTALASI AIR KOTOR Rp. 21,780,000.00

JUMLAH Rp. #REF!


PPN Rp. #REF!
TOTAL Rp. #REF!
DIBULATKAN Rp. #REF!

Terbilang : #REF!

Sinabang, 04 Mei 2017


CV. DAMAI FAAKHI-AKHI

IBNU HASAN
Direktur
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KESEHATAN
PEKERJAAN : PEMBANGUNAN RUMAH BIDAN DAN PENATAAN HALAMAN PUSKESMAS SANGGIRAN (OTSUS)
LOKASI : KABUPATEN SIMEULUE
TAHUN ANGGARAN : 2017
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN
(Rp.)
1 2 3 4 5 6

A. PEKERJAAN PERSIAPAN

1 Pembersihan Lapangan 1.00 Ls Taksir 1,000,000.00

2 Mobilisasi Dan Demobilisasi 1.00 Ls Taksir 4,000,000.00

3 Pengukuran dan Pemasangan Bowplank 1.00 Ls Taksir 4,000,000.00

4 Pemasangan Papan Proyek 1.00 Unit Taksir 700,000.00

5 P3K 1.00 Ls Taksir 1,000,000.00

6 Administrasi Dan Dokumentasi 1.00 Paket Taksir 3,000,000.00

SUB JUMLAH

B. PEKERJAAN TANAH DAN PONDASI

1 Galian Tanah Pondasi menerus Bangunan 84.60 M3 A. 2.3.1.4 130,548.00

2 Galian Tanah Teras Selasar 1.46 M3 A. 2.3.1.4 130,548.00

3 Galian tanah pondasi tapak Kolom Utama 24.95 M3 A. 2.3.1.2 119,542.50


4 Galian tanah pondasi tapak Kolom Teras 3.51 M3 A. 2.3.1.2 119,542.50

5 Urugan Kembali Bekas Galian 36.17 M3 A. 2.3.1.9 69,575.00

6 Urugan Pasir Bawah Pondasi 7.67 M3 A. 2.3.1.11 171,215.00


7 Pasangan Batu Kosong 12.34 M3 A.3.2.1.2.A 355,525.50

8 Lantai Kerja Beton Tumbuk 3.06 M3 A.4.1.1.4 906,774.09

9 Pasangan Pondasi Batu Belah 35.25 M3 A. 3.2.1.2 763,262.50

10 Plat Pondasi Tapak Kolom Utama 6.51 M3 Suplemen 1.a 3,633,600.00

11 Plat Pondasi Tapak kolom Teras 0.57 M3 Suplemen 1.b #REF!

SUB JUMLAH

C. PEKERJAAN BETON BERTULANG

1 Sloof Beton 20/25 cm 5.68 M3 Suplemen 2.a #REF!

2 Kolom Beton 20/20 cm 9.06 M3 Suplemen 3.b #REF!

3 Kolom Praktis 15/15 cm 0.73 M3 Suplemen 3.c #REF!

4 Ring balok (Balok Pinggang) 15/20 cm 4.61 M3 Suplemen 5.b #REF!

5 Balok latai atas kosen 15/15 cm 0.73 M3 Suplemen 4.f #REF!

6 Plat Dag Kanopi 10 cm 1.85 M3 Suplemen 6.b #REF!

7 Relief kolom Teras 1.00 Ls Taksir 3,000,000.00

SUB JUMLAH

D. PEKERJAAN PASANGAN DAN PLASTERAN


1 Pasangan Trasram Bata 1 PC : 2 PP dibawah Lantai 58.90 M2 A. 4.4.1.7 138,586.25

2 Plesteran Trasram Bata 1 PC : 2 PP dibawah Lantai 123.51 M2 A. 4.4.2.2 80,220.14

3 Pasangan Dinding Bata 1 PC : 4 PP 332.90 M2 A. 4.4.1.9 128,128.00


4 Plesteran Dinding Bata 1PC : 4 PP 614.29 M2 A. 4.4.2.4 74,787.90

5 Plesteran beton bertulang 1 PC : 2 PP 20.79 M2 A. 4.4.2.2 80,220.14

SUB JUMLAH

E. PEKERJAAN LANTAI

Pekerjaan Timbunan Dan Urugan


1 Timbunan Tanah Bawah Lantai Ruangan 39.02 M3 A.2.3.1.14.a 113,987.50

2 Timbunan Tanah dibawah Teras dan selasar 7.25 M3 A.2.3.1.14.a 113,987.50

3 Urugan Pasir Bawah Lantai Ruangan dan selasar 12.19 M3 A.2.3.1.11 171,215.00

4 Urugan Pasir Bawah Lantai Selasar dan Teras 1.72 M3 A.2.3.1.11 171,215.00

Pekerjaan Lantai Keramik


1 Beton Tumbuk Dibawah Lantai Keramik t = 5 cm 6.95 M3 A.4.1.1.4 906,774.09

2 Lantai Keramik 60 x 60 cm polished pada ruangan, KT. Utama & R. Praktek 76.80 M2 A.4.4.3.34 418,849.75
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN
(Rp.)
1 2 3 4 5 6

3 Lantai Keramik 40 x 40 cm unpolished pada selasar 9.00 M2 A.4.4.3.34a 216,348.00

4 Lantai Keramik Ukuran 20 x 20 cm unpolished KM/WC 7.00 M2 A.4.4.3.50 175,177.20

5 Dinding Keramik 20 x 25 cm unpolished KM/WC 15.79 M2 A.4.4.3.51 123,088.00

SUB JUMLAH

F. PEKERJAAN ATAP DAN PLAFOND

1 Rangka kuda-kuda dan gording baja ringan Multytruss 234.60 M2 A.4.5.2.36 100,039.50

2 Penutup Atap Genteng Metal 234.60 M2 A.4.5.2.32 83,506.50

3 Rabung Genteng Metal 25.00 M' A.4.5.2.37 121,660.00

4 Lesplang Kayu 2,5/25 cm 53.43 M' A.4.6.1.21 66,676.50

5 Plafond Tripleks 6 mm Ruangan 114.90 M2 A.4.5.1.5 70,174.50

6 Plafond Tripleks 6 mm Teras (tritisan) 90.44 M2 A.4.5.1.5 70,174.50

7 Rangka plafond 129.15 M2 A.4.6.1.19 80,960.00


8 Kayu lis eternit 205.16 M' Taksir 35,000.00

SUB JUMLAH

G. PEKERJAAN PINTU JENDELA DAN KUNCI


1 Pintu Type P1, P2
- Kosen Kayu 6/13 0.11 M3 A.4.6.1.1 10,215,700.00

- Daun Pintu Panel Ukuran 70 x 210 cm 2.00 Buah Taksir 2,000,000.00

- Daun Pintu Panel Ukuran 80 x 210 cm 3.00 Buah Taksir 2,000,000.00

- Daun Pintu Kamar Mandi Aluminium 1.00 Buah Taksir 1,300,000.00

- Ventilasi Jalusi 1.71 M2 A.4.6.1.10 323,207.50

- Kunci slinder merk setara SES 5.00 Buah A.4.6.2.4 158,477.00

- Pegangan Pintu 5.00 Buah A.4.6.2.12 192,541.25

- Slot pintu double 5.00 Buah Taksir 300,000.00

- Engsel Pintu 15.00 Buah A.4.6.2.5 38,677.38

2 Jendela Type J1, j2,J3 Bhan Upvc


- Kosen Kayu 6/13 0.68 M3 A.4.6.1.1 10,215,700.00

- Daun Jendela Ukuran 53 x 120 cm 10.00 Buah Taksir 2,300,000.00


- Daun Jendela Ukuran 33 x 120 cm 4.00 Buah Taksir 2,200,000.00
- Daun Jendela Ukuran 33 x 190 cm 2.00 Buah Taksir 2,800,000.00
- Ventilasi 53 x 20 cm 10.00 Buah Taksir 1,600,000.00
- Ventilasi 33 x 20 cm 6.00 Buah Taksir 1,600,000.00
- Engsel Jendela 60.00 Buah A.4.6.2.6 35,762.38
- Grendel Jendela 30.00 Buah A.4.6.2.8a 46,762.38
- Hak Penahan Angin Jendela 28.00 Buah A.4.6.2.9 41,262.38
- Tarikan Jendela 16.00 Buah A.4.6.2.9 41,262.38
- Kaca 5 mm 0.64 M2 A.4.6.2.17 95,553.70
SUB JUMLAH
H. PEKERJAAN PENGECATAN
1 Cat Tembok Anti Jamur 3 x (L/D) Super Vinilex Setara 687.58 M2 A.4.7.1.10 22,592.90
2 Cat Plafond dan List Plafond 208.00 M2 A.4.7.1.4 28,710.00
3 Cat Mengkilat Lesplang Kayu 163.98 M2 A.4.7.1.4 28,710.00
4 Cat Mengkilat Kosen Pintu/Jendela/Jalusi 47.20 M2 A.4.7.1.4 28,710.00
5 Cat Mengkilat Daun Pintu/Jendela 11.90 M2 A.4.7.1.4 28,710.00
SUB JUMLAH
I. PEKERJAAN INSTALASI LISTRIK
1 Armatur
;- Lampu HE 35 watt balk + reflektor 7.00 Buah Taksir 200,000.00
- Lampu HE 40 wtt + reflektor 3.00 Buah Taksir 225,000.00
2 Saklar lampu Merk Broco 2 seri
- skalar 1 seri setara Broco 5.00 Buah Taksir 100,000.00
- skalar 2 seri setara Broco 2.00 Buah Taksir 100,000.00
3 Stop Kontak 10.00 Buah Taksir 150,000.00
Instlasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC
4 22.00 Titik Taksir 150,000.00
fitting lampu dan kelengkapan instalasi Terpasang
Instalasi titik Stop kontak, instalasi termasuk kabel NYA 2,5 mm dalam pipa
5 10.00 Titik Taksir 150,000.00
PVC, kotak kontak dan kelengkapan instalasi terpasang.
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN
(Rp.)
1 2 3 4 5 6

6 Box Panel Distribusi 2.00 Buah Taksir 500,000.00


7 Pemasangan Arus Listrik 6 Ampere 2.00 Buah Taksir 4,500,000.00
SUB JUMLAH
J. PEKERJAAN INSTALASI AIR BERSIH
1 Pengadaan Pipa PVC 3/4" dan Accsesories 12.00 M' Taksir 100,000.00
Pemasangan Intalasi Pipa Air Bersih Sampai ke titik (Sudah termasuk Galian,
2 12.00 Titik Taksir 300,000.00
Pembobokan, penyambungan Koneksi dan Aksesories)
3 Pembuatan Sumur Bor Tangki Air 1500 Ton+ Tower Air + Mesin Air 1.00 Titik Taksir 12,000,000.00
4 Kran Air Standar San Ei 2.00 Ls Taksir 100,000.00
5 Bak Air Fiber 2.00 Buah Taksir 350,000.00
SUB JUMLAH
K. PEKERJAAN PENATAAN HALAMAN
1 Penimbunan Tanah Bangunan dan (Jalan (3x38x0.4) Meter) 216.60 M3 A.2.3.1.14.a 113,987.50
2 Pemasangan Paving Blok (2.5x24) Meter 60.00 M2 A.4.4.3.87 281,979.50
3 Penimbunan Pasir 22.80 M3 A. 2.3.1.11 171,215.00
4 Pemasangan Kanstin 82.00 M' Taksir 200,000.00
SUB JUMLAH
L. PEKERJAAN INSTALASI AIR KOTOR
1 Pengadaan Pipa PVC 3 " dan Accsesories 12.00 M' Taksir 170,000.00
2 Pengadaan Pipa PVC 4 " dan Accsesories 12.00 M' Taksir 170,000.00
Pemasangan Intalasi Pipa Air Kotor Sampai ke titik (Sudah termasuk Galian,
3 4.00 Titik Taksir 200,000.00
Pembobokan, penyambungan Koneksi dan Aksesories)
4 Closet Jongkok Stara TOTO 2.00 Buah Taksir 2,000,000.00
5 Floor Drain Stainless Steel 2.00 Buah Taksir 150,000.00
6 Box Kontrol 60 x 60 cm 2.00 Buah Taksir 300,000.00
7 Septictank dan Peresapan 2.00 Buah Taksir 6,000,000.00
SUB JUMLAH
JUMLAH
HARGA
(Rp.)
7

1,000,000.00

4,000,000.00

4,000,000.00

700,000.00

1,000,000.00

3,000,000.00

13,700,000.00

11,044,360.80

190,600.08

2,982,585.38
419,594.18

2,516,527.75

1,313,219.05
4,387,184.67

2,774,728.71

26,905,003.13

23,654,736.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

3,000,000.00

#REF!

8,162,730.13

9,907,989.49

42,653,811.20
45,941,459.09

1,667,776.71

108,333,766.62

4,447,792.25

826,409.38

2,087,110.85

294,489.80

6,302,079.91

32,167,660.80
JUMLAH
HARGA
(Rp.)
7

1,947,132.00

1,226,240.40

1,943,559.49

51,242,474.87

23,469,266.70

19,590,624.90

3,041,500.00

3,562,525.40

8,063,050.05

6,346,581.78

10,455,984.00
7,180,600.00

81,710,132.83

1,123,727.00

4,000,000.00

6,000,000.00

1,300,000.00

552,684.83

792,385.00

962,706.25

1,500,000.00

580,160.63

6,946,676.00

23,000,000.00
8,800,000.00
5,600,000.00
16,000,000.00
9,600,000.00
2,145,742.50
1,402,871.25
1,155,346.50
660,198.00
61,154.37
92,183,652.32

15,534,426.18
5,971,680.00
4,707,865.80
1,355,112.00
341,649.00
27,910,732.98

1,400,000.00
675,000.00

500,000.00
200,000.00
1,500,000.00

3,300,000.00

1,500,000.00
JUMLAH
HARGA
(Rp.)
7

1,000,000.00
9,000,000.00
19,075,000.00

1,200,000.00

3,600,000.00

12,000,000.00
200,000.00
700,000.00
17,700,000.00

24,689,692.50
16,918,770.00
3,903,702.00
16,400,000.00
61,912,164.50

2,040,000.00
2,040,000.00

800,000.00

4,000,000.00
300,000.00
600,000.00
12,000,000.00
21,780,000.00
A. 2.2.1.4 Pengukuran dan Pemasangan 1m' Bouwplank
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.100 115,000.00
Tukang kayu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 130,000.00
Mandor L.04 OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Balok 5/7 m3 0.120 5,000,000.00
Paku 2"-3" Kg 0.020 15,000.00
Kayu Papan 3/20 m3 0.007 5,000,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A. 2.3.1.4 Penggalian 1 m3 Tanah Keras sedalam 1 m

No. Uraian Kode Satuan Koeefisien Harga Satuan


A TENAGA
Pekerja L.01 OH 1.000 115,000.00
Mandor L.04 OH 0.032 115,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.3.1.1 Penggalian 1 m3 Tanah sedalam 1 m

No. Uraian Kode Satuan Koeefisien Harga Satuan


A TENAGA
Pekerja L.01 OH 0.750 115,000.00
Mandor L.04 OH 0.025 115,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.3.1.2 Penggalian 1 m3 Tanah Biasa sedalam 2 m

No. Uraian Kode Satuan Koeefisien Harga Satuan


A TENAGA
Pekerja L.01 OH 0.900 115,000.00
Mandor L.04 OH 0.045 115,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.3.1.3 Penggalian 1 m3 Tanah Biasa sedalam 3 m

No. Uraian Kode Satuan Koeefisien Harga Satuan


A TENAGA
Pekerja L.01 OH 1.050 115,000.00
Mandor L.04 OH 0.067 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.3.1.9 Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koofisien pekerjaan galian
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.500 115,000.00
Mandor L.04 OH 0.050 115,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.3.1.10 Pemadatan Tanah 1m3 tanah (per 20 cm)
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koofisien pekerjaan galian
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.500 115,000.00
Mandor L.04 OH 0.050 115,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.3.1.11 Pengurugan 1 m3 dengan pasir urug


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.300 115,000.00
Mandor L.04 OH 0.010 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pasir Urug m3 1.200 100,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.2.3.1.14.a Pengurugan 1 m3 Tanah Timbun
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.250 115,000.00
Mandor L.04 OH 0.025 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Tanah Timbun m3 1.200 60,000.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

A. 3.2.1.2 Pemasangan 1m3 pondasi batu belah campuran 1SP : 4PP


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.500 115,000.00
Tukang batu L.02 OH 0.750 125,000.00
Kepala Tukang L.03 OH 0.075 130,000.00
Mandor L.04 OH 0.075 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Batu Belah/ Kali m3 1.200 110,000.00
Semen Portland Kg 163.000 1,350.00
Pasir Pasang m3 0.520 110,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.3.2.1.2.A Pemasangan 1m3 batu kosong (Aanstamping)
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.780 115,000.00
Tukang batu L.02 OH 0.390 125,000.00
Kepala Tukang L.03 OH 0.039 130,000.00
Mandor L.04 OH 0.039 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Batu Belah/ Kali m3 1.200 110,000.00
Pasir Urug m3 0.432 100,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 3.2.1.10 Pemasangan 1m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3KR dan 40% Batu Belah
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 3.400 115,000.00
Tukang batu L.02 OH 0.850 125,000.00
Kepala Tukang L.03 OH 0.085 130,000.00
Mandor L.04 OH 0.170 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Batu Belah/ Kali m3 0.480 110,000.00
Semen Portland kg 194.000 1,350.00
Pasir Beton m3 0.312 130,000.00
Kerikil m3 0.468 240,000.00
Besi Beton Polos kg 126.000 12,000.00
Kawat Beton kg 1.800 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 3.2.1.11 Pemasangan 1m3 pondasi sumuran, diameter 100 cm
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 2.400 115,000.00
Tukang batu L.02 OH 0.800 125,000.00
Kepala Tukang L.03 OH 0.080 130,000.00
Mandor L.04 OH 0.119 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Batu Belah/ Kali m3 0.450 110,000.00
Semen Portland kg 194.000 1,350.00
Pasir Beton m3 0.312 130,000.00
Kerikil m3 0.468 240,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


Catatan : Bobot isi pasir = 1400 kg/m3 , Bobot isi kerikil = 1350 kg/m3
A.4.1.1.4 Membuat 1 m3 beton mutu f'c = 7.4 Mpa (K 100),slump (3-6) cm
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.200 115,000.00
Tukang batu L.02 OH 0.200 125,000.00
Kepala Tukang L.03 OH 0.020 130,000.00
Mandor L.04 OH 0.060 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 230 1,350.00
Pasir Beton kg 893 92.86
Kerikil Beton kg 1,027 177.78
Air Liter 200 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.2 Membuat 1 m3 beton mutu f'c = 9.8 Mpa (K 125),slump (12 ± 2) cm, w/c = 0.78
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.650 115,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala Tukang L.03 OH 0.028 130,000.00
Mandor L.04 OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 276 1,350.00
Pasir Beton kg 828 92.86
Kerikil (Maks 30 mm) kg 1,012 177.78
Air Liter 215 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.1.1.3 Membuat 1 m3 beton mutu f'c = 12.2 Mpa (K 150),slump (12 ± 2) cm, w/c = 0.72
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.650 115,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala Tukang L.03 OH 0.028 130,000.00
Mandor L.04 OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 299 1,350.00
Pasir Beton kg 799 92.86
Kerikil (Maks 30 mm) kg 1,017 177.78
Air Liter 215 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7.4 Mpa (K 100),slump (3 - 6) cm, w/c = 0.87
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.200 115,000.00
Tukang batu L.02 OH 0.200 125,000.00
Kepala Tukang L.03 OH 0.020 130,000.00
Mandor L.04 OH 0.060 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 230 1,350.00
Pasir Beton kg 893 92.86
Kerikil (Maks 30 mm) kg 1,027 177.78
Air Liter 200 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. A.4.1.1.5 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0.66
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.650 115,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala Tukang L.03 OH 0.028 130,000.00
Mandor L.04 OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 326 1,350.00
Pasir Beton kg 760 92.86
Kerikil (Maks 30 mm) kg 1,029 177.78
Air Liter 215 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.6 Membuat 1 m3 beton mutu f'c = 16.9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0.61
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.650 115,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala Tukang L.03 OH 0.028 130,000.00
Mandor L.04 OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 352 1,350.00
Pasir Beton kg 731 92.86
Kerikil (Maks 30 mm) kg 1,031 177.78
Air Liter 215 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19.3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0.58
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.650 115,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala Tukang L.03 OH 0.028 130,000.00
Mandor L.04 OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 371 1,350.00
Pasir Beton kg 698 92.86
Kerikil (Maks 30 mm) kg 1,047 177.78
Air Liter 215 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.8 Membuat 1 m3 beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0.56
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.650 115,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala Tukang L.03 OH 0.028 130,000.00
Mandor L.04 OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 384 1,350.00
Pasir Beton kg 692 92.86
Kerikil (Maks 30 mm) kg 1,039 177.78
Air Liter 215 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.1.1.9 Membuat 1 m3 beton mutu f'c = 24 Mpa (K 275), slump (12 ± 2) cm, w/c = 0.53
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.650 115,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala Tukang L.03 OH 0.028 130,000.00
Mandor L.04 OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 406 1,350.00
Pasir Beton kg 684 92.86
Kerikil (Maks 30 mm) kg 1,026 177.78
Air Liter 215 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.10 Membuat 1 m3 beton mutu f'c = 26.4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0.52
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.650 115,000.00
Tukang batu L.02 OH 0.275 125,000.00
Kepala Tukang L.03 OH 0.028 130,000.00
Mandor L.04 OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 413 1,350.00
Pasir Beton kg 681 92.86
Kerikil (Maks 30 mm) kg 1,021 177.78
Air Liter 215 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.1.1.11 Membuat 1 m3 beton mutu f'c = 28.8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0.49
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 2.100 115,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala Tukang L.03 OH 0.035 130,000.00
Mandor L.04 OH 0.105 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 439 1,350.00
Pasir Beton kg 670 92.86
Kerikil (Maks 30 mm) kg 1,006 177.78
Air Liter 215 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.12 Membuat 1 m3 beton mutu f'c = 31.2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0.48
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 2.100 115,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala Tukang L.03 OH 0.035 130,000.00
Mandor L.04 OH 0.105 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 448 1,350.00
Pasir Beton kg 667 92.86
Kerikil (Maks 30 mm) kg 1,000 177.78
Air Liter 215 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.1.1.17 Pembesian 10 kg dengan besi polos


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.070 115,000.00
Tukang besi L.02 OH 0.070 125,000.00
Kepala Tukang L.03 OH 0.007 130,000.00
Mandor L.04 OH 0.004 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Besi Beton Polos kg 10.500 12,000.00
Kawat Beton kg 0.150 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan per kg besi F : 10 kg
A. 4.1.1.17a Pembesian 10 kg dengan besi ulir
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.070 115,000.00
Tukang besi L.02 OH 0.070 125,000.00
Kepala Tukang L.03 OH 0.007 130,000.00
Mandor L.04 OH 0.004 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Besi Beton Ulir kg 10.500 12,500.00
Kawat Beton kg 0.150 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan per kg besi F : 10 kg

A. 4.1.1.20 Pemasangan 1m2 bekesting untuk pondasi


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.520 115,000.00
Tukang kayu L.02 OH 0.260 125,000.00
Kepala Tukang L.03 OH 0.026 130,000.00
Mandor L.04 OH 0.026 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 2,500,000.00
Paku 5 - 10 cm kg 0.300 15,000.00
Minyak Bekesting liter 0.100 10,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.21 Pemasangan 1m2 bekesting untuk sloof
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.520 115,000.00
Tukang kayu L.02 OH 0.260 125,000.00
Kepala Tukang L.03 OH 0.026 130,000.00
Mandor L.04 OH 0.026 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.045 2,500,000.00
Paku 5 - 10 cm kg 0.300 15,000.00
Minyak Bekesting liter 0.100 10,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.1.1.22 Pemasangan 1m2 bekesting untuk kolom


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.660 115,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala Tukang L.03 OH 0.033 130,000.00
Mandor L.04 OH 0.033 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 2,500,000.00
Paku 5 - 10 cm kg 0.400 15,000.00
Minyak Bekesting liter 0.200 10,000.00
Balok Kayu Klas II m3 0.015 3,000,000.00
Plywood tebal 9 mm Lbr 0.350 140,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 2.000 7,560.00
- panjang 4 m
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.23 Pemasangan 1m2 bekesting untuk balok
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.660 115,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala Tukang L.03 OH 0.033 130,000.00
Mandor L.04 OH 0.033 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 2,500,000.00
Paku 5 - 10 cm kg 0.400 15,000.00
Minyak Bekesting liter 0.200 10,000.00
Balok Kayu Klas II m3 0.018 3,000,000.00
Plywood tebal 9 mm Lbr 0.350 140,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 2.000 7,560.00
- panjang 4 m
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.24 Pemasangan 1m2 bekesting untuk Plat lantai
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.660 115,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala Tukang L.03 OH 0.033 130,000.00
Mandor L.04 OH 0.033 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 2,500,000.00
Paku 5 - 10 cm kg 0.400 15,000.00
Minyak Bekesting liter 0.200 10,000.00
Balok Kayu Klas II m3 0.015 3,000,000.00
Plywood tebal 9 mm Lbr 0.350 140,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 6.000 7,560.00
- panjang 4 m
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.25 Pemasangan 1m2 bekesting untuk dinding
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.660 115,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala Tukang L.03 OH 0.033 130,000.00
Mandor L.04 OH 0.033 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.030 2,500,000.00
Paku 5 - 10 cm kg 0.400 15,000.00
Minyak Bekesting liter 0.200 10,000.00
Balok Kayu Klas II m3 0.020 3,000,000.00
Plywood tebal 9 mm Lbr 0.350 140,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 3.000 7,560.00
- panjang 4 m
Penjaga Jarak
Buah 4.000 5,000.00
bekesting/ spacer
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.26 Pemasangan 1m2 bekesting untuk tangga
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.660 115,000.00
Tukang kayu L.02 OH 0.330 125,000.00
Kepala Tukang L.03 OH 0.033 130,000.00
Mandor L.04 OH 0.033 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.030 2,500,000.00
Paku 5 - 10 cm kg 0.400 15,000.00
Minyak Bekesting liter 0.150 10,000.00
Balok Kayu Klas II m3 0.015 3,000,000.00
Plywood tebal 9 mm Lbr 0.350 140,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 2.000 7,560.00
- panjang 4 m
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.1.1.27 Pemasangan 1m2 jembatan untuk pengecoran beton


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.150 115,000.00
Tukang kayu L.02 OH 0.050 125,000.00
Kepala Tukang L.03 OH 0.005 130,000.00
Mandor L.04 OH 0.008 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.026 2,500,000.00
Paku 5 - 10 cm kg 0.600 15,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 0.500 7,560.00
- panjang 4 m
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

A. 4.2.1.2 Pemasangan 1 kg baja IWF


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.060 115,000.00
Tukang besi L.03 OH 0.060 125,000.00
Kepala Tukang L.03 OH 0.006 130,000.00
Mandor L.04 OH 0.003 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Besi Baja IWF kg 1.150 36,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.2.1.2a Pemasangan 1 M2 Rangka Kuda-Kuda baja ringan


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.140 115,000.00
Tukang besi L.03 OH 0.400 125,000.00
Kepala Tukang L.03 OH 0.040 130,000.00
Mandor L.04 OH 0.070 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Baja profil C 75.75 M' 0.420 20,000.00
Reng U 0.5 M' 0.350 15,000.00
Baut Truss Buah 2.000 200.00
Baut Reng Buah 2.000 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.2.1.3 Pengerjaan 100 kg pekerjaan perakitan
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.100 115,000.00
Tukang besi L.03 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.001 130,000.00
Mandor L.04 OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Solar Liter 1.000 8,000.00
Minyak Pelumas Liter 0.100 30,000.00
Jumlah Harga Bahan
C PERALATAN
Sewa Alat Jam 0.800 150,000.00
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.040 115,000.00
Tukang besi L.03 OH 0.020 125,000.00
Kepala Tukang L.03 OH 0.002 130,000.00
Mandor L.04 OH 0.002 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kawat Lat Listrik kg 0.400 35,000.00
Solar Liter 0.300 8,000.00
Minyak Pelumas Liter 0.040 30,000.00
Jumlah Harga Bahan
C PERALATAN
Sewa Alat Jam 0.170 150,000.00
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafont
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.350 115,000.00
Tukang besi L.03 OH 0.350 125,000.00
Kepala Tukang L.03 OH 0.035 130,000.00
Mandor L.04 OH 0.018 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Rangka metal Hollow
m' 4.000 25,000.00
40.40.2 mm
Assesories
(perkuatan,las. dll), Ls 1.000 25,000.00
100% dari rangka
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A. 4.4.1.7 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 2PP
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.300 115,000.00
Tukang batu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 130,000.00
Mandor L.04 OH 0.015 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah bh 70.000 660.00
Semen Portland kg 18.950 1,350.00
Pasir Pasang m3 0.038 110,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.8 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 3PP
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.300 115,000.00
Tukang batu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 130,000.00
Mandor L.04 OH 0.015 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah bh 70.000 660.00
Semen Portland kg 14.370 1,350.00
Pasir Pasang m3 0.040 110,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.9 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 4PP
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.300 115,000.00
Tukang batu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 130,000.00
Mandor L.04 OH 0.015 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah bh 70.000 660.00
Semen Portland kg 11.500 1,350.00
Pasir Pasang m3 0.043 110,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A. 4.4.2.1 Pemasangan 1 m2 Plesteran 1SP : 1PP tebal 15 mm


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.300 115,000.00
Tukang batu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.015 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 15.504 1,350.00
Pasir Pasang m3 0.016 110,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.2.2 Pemasangan 1 m2 Plesteran 1SP : 2PP tebal 15 mm


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.300 115,000.00
Tukang batu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.015 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 10.224 1,350.00
Pasir Pasang m3 0.020 110,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.2.14 Pemasangan 1 m2 pelasteran 1 SP : 3PP tebal 20 mm
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.260 115,000.00
Tukang batu L.02 OH 0.200 125,000.00
Kepala Tukang L.03 OH 0.020 130,000.00
Mandor L.04 OH 0.013 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 10.368 1,350.00
Pasir Pasang m3 0.031 110,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.2.15 Pemasangan 1 m2 pelasteran 1 SP : 4PP tebal 20 mm


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.400 115,000.00
Tukang batu L.02 OH 0.200 125,000.00
Kepala Tukang L.03 OH 0.020 130,000.00
Mandor L.04 OH 0.022 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 8.320 1,350.00
Pasir Pasang m3 0.032 110,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.2.4 Pemasangan 1 m2 Plesteran 1SP : 4PP tebal 15 mm
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.300 115,000.00
Tukang batu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.015 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 6.240 1,350.00
Pasir Pasang m3 0.024 110,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.2.27 Pemasangan 1 m2 Acian


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.200 115,000.00
Tukang batu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 130,000.00
Mandor L.04 OH 0.010 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 3.250 1,350.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.34a 1 m2 Memasang lantai keramik uk.( 40 x 40 cm') Anti Slip


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.620 115,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala Tukang L.03 OH 0.035 130,000.00
Mandor L.04 OH 0.030 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 6.560 8,000.00
Semen Portland kg 10.000 1,350.00
Pasir Pasang m3 0.045 110,000.00
Semen Warna kg 1.500 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.3.34.a 1 m2 Memasang lantai keramik uk.( 80 x 80 cm') Polished


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.250 115,000.00
Tukang batu L.02 OH 0.125 125,000.00
Kepala Tukang L.03 OH 0.013 130,000.00
Mandor L.04 OH 0.013 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 1.563 120,000.00
Semen Portland kg 9.600 1,350.00
Pasir Pasang m3 0.045 110,000.00
Semen Warna kg 1.500 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.3.34.b 1 m2 Memasang lantai keramik uk.( 80 x 80 cm') unPolished


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.250 115,000.00
Tukang batu L.02 OH 0.125 125,000.00
Kepala Tukang L.03 OH 0.013 130,000.00
Mandor L.04 OH 0.013 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 1.563 110,000.00
Semen Portland kg 9.600 1,350.00
Pasir Pasang m3 0.045 110,000.00
Semen Warna kg 1.500 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.35 Pemasangan 1 m2 Lantai Keramik ukuran 20 x 20 cm Unpolished


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Laden Tukang Batu / Besi OH 0.700 115,000.00
Tukang batu OH 0.350 125,000.00
Kepala Tukang OH 0.035 130,000.00
Mandor OH 0.030 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Ubin keramik 30x30 Unpolished Bh 11.670 5,220.00
Semen Portland kg 10.000 1,350.00
Pasir Pasang m3 0.045 110,000.00
Semen Warna kg 1.500 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.50 Pemasangan 1 m2 Lantai Keramik ukuran 20 x 20 cm Unpolished


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.090 115,000.00
Tukang batu L.02 OH 0.450 125,000.00
Kepala Tukang L.03 OH 0.045 130,000.00
Mandor L.04 OH 0.045 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 26.500 2,400.00
Semen Portland kg 9.300 1,350.00
Pasir Pasang m3 0.018 110,000.00
Semen Warna kg 1.940 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.34 1 m2 Memasang lantai keramik uk.( 60 x 60 cm')
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.700 115,000.00
Tukang batu L.02 OH 0.350 125,000.00
Kepala Tukang L.03 OH 0.035 130,000.00
Mandor L.04 OH 0.030 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 6.560 35,000.00
Semen Portland kg 8.190 1,350.00
Pasir Pasang m3 0.045 110,000.00
Semen Warna kg 1.620 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.3.51 1 m2 Memasang dinding keramik uk.(30x60) cm Polished
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.090 115,000.00
Tukang batu L.02 OH 0.450 125,000.00
Kepala Tukang L.03 OH 0.045 130,000.00
Mandor L.04 OH 0.045 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 5.556 3,050.00
Semen Portland kg 9.300 1,350.00
Pasir Pasang m3 0.018 110,000.00
Semen Warna kg 1.552 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.15 Pemasangan 1 m2 Lantai Keramik 25 x 25 cm (Antislip)


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.260 115,000.00
Tukang batu L.02 OH 0.130 125,000.00
Kepala Tukang L.03 OH 0.013 130,000.00
Mandor L.04 OH 0.013 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 16.000 2,500.00
Semen Portland kg 10.000 1,350.00
Pasir Pasang m3 0.045 110,000.00
Semen Warna kg 1.500 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.3.54 Pemasangan 1 m2 Dinding Keramik ukuran 25 x 40 cm
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.900 115,000.00
Tukang batu L.02 OH 0.450 125,000.00
Kepala Tukang L.03 OH 0.045 130,000.00
Mandor L.04 OH 0.045 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 10.000 5,675.00
Semen Portland kg 9.300 1,350.00
Pasir Pasang m3 0.018 110,000.00
Semen Warna kg 1.940 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.3.51.a 1 m2 Memasang dinding keramik uk.(30x30) cm Polished


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.090 115,000.00
Tukang batu L.02 OH 0.450 125,000.00
Kepala Tukang L.03 OH 0.045 130,000.00
Mandor L.04 OH 0.045 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik dinding 30x30 Polished Bh 11.670 2,500.00
Semen Portland kg 9.300 1,350.00
Pasir Pasang m3 0.018 110,000.00
Semen Warna kg 1.552 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.3.60 Pemasangan 1 m2 Wallpaper lebar 50 cm
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.350 115,000.00
Tukang L.02 OH 0.175 125,000.00
Kepala Tukang L.03 OH 0.017 130,000.00
Mandor L.04 OH 0.002 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Walpaper m 2.200 23,000.00
Lem kg 0.250 25,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A. 4.5.1.5 1 m2 Memasang langit-langit tripleks uk. (120 x 240) cm, tebal 6 mm


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.100 115,000.00
Tukang Kayu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 130,000.00
Mandor L.04 OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Triplex Lembar 0.250 150,000.00
Paku Triplex kg 0.030 14,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.19 1 m2 Memasang rangka langit-langi kayu Klas II & III
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.150 115,000.00
Tukang Kayu L.02 OH 0.300 125,000.00
Kepala Tukang L.03 OH 0.030 130,000.00
Mandor L.04 OH 0.010 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Kaso Lembar 0.006 1,800,000.00
Paku Kayu Biasa kg 0.200 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.5.1.7 Pemasangan 1 m2 Langit-langit Gypsum Board ukuran (120 x 240) cm, tebal 9 mm
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.100 115,000.00
Tukang Kayu L.02 OH 0.050 125,000.00
Kepala Tukang L.03 OH 0.005 130,000.00
Mandor L.04 OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Gypsum Board Lembar 0.364 80,000.00
Paku Skrup kg 0.110 500.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.5.1.9 1 m1 Memasang list gypsum profil


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.050 115,000.00
Tukang Kayu L.02 OH 0.050 125,000.00
Kepala Tukang L.03 OH 0.005 130,000.00
Mandor L.04 OH 0.003 115,000.00
Jumlah Tenaga Kerja
B BAHAN
List Gysum Profil m' 1.050 20,000.00
Paku kg 0.010 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

A. 4.5.2.30 Pemasangan 1 m2 Genteng Beton


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.200 115,000.00
Tukang Kayu L.03 OH 0.100 125,000.00
Kepala Tukang L.11 OH 0.010 130,000.00
Mandor L.15 OH 0.010 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Genteng Beton Bh 11.000 7,500.00
Paku Biasa 2" - 5" kg 0.030 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.32 1 m2 Pemasangan Seng Genteng Metal


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.200 115,000.00
Tukang Kayu L.03 OH 0.100 125,000.00
Kepala Tukang L.11 OH 0.010 130,000.00
Mandor L.15 OH 0.001 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Seng Spandek M2 0.400 85,000.00
Paku ½" - 1" kg 0.200 25,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.5.2.32 Pemasangan 1 m2 Seng Spandex
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.200 115,000.00
Tukang Kayu L.03 OH 0.100 125,000.00
Kepala Tukang L.11 OH 0.010 130,000.00
Mandor L.15 OH 0.010 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Seng Spandex Lbr 1.020 85,000.00
Paku Skrup kg 0.200 20,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.5.2.34 Pemasangan 1 m' Nok Genteng Beton
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.400 115,000.00
Tukang Kayu L.03 OH 0.200 125,000.00
Kepala Tukang L.11 OH 0.020 130,000.00
Mandor L.15 OH 0.020 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Nok Genteng Beton Bh 3.500 20,000.00
Paku Biasa 1/2"-1" kg 0.050 25,000.00
Semen Portland kg 10.800 1,350.00
Pasir Pasang m3 0.032 110,000.00
Semen Warna kg 1.000 1,800.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.37 1 m1 Pemasangan Rabung Seng Genteng Metal


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.140 115,000.00
Tukang Kayu L.03 OH 0.400 125,000.00
Kepala Tukang L.11 OH 0.040 130,000.00
Mandor L.15 OH 0.070 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Rabung Seng Metal Lbr 0.600 50,000.00
Paku Biasa 1/2"-1" Bh 0.050 25,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.5.2.38 Pemasangan 1 m2 Atap Seng Gelombang
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.120 115,000.00
Tukang Kayu L.03 OH 0.060 125,000.00
Kepala Tukang L.11 OH 0.006 130,000.00
Mandor L.15 OH 0.006 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Seng Gelombang 3 x 6 kaki Lbr 0.700 85,000.00
Paku Seng kg 0.020 25,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.5.2.36 1 M2 Rangka Kuda-kuda Aluzing 55 % Aluminium untuk Metal


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.250 115,000.00
Tukang Kayu L.03 OH 0.150 125,000.00
Kepala Tukang L.11 OH 0.015 130,000.00
Mandor L.15 OH 0.013 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Profil C 75.75 M3 1.000 20,000.00
Reng U 0.5 Btg 1.000 15,000.00
Baut Truss Bh 14.000 200.00
Baut Reng Bh 11.000 200.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.5.2.40. Pemasangan 1 m2 Atap Aluminium
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.150 115,000.00
Tukang Kayu L.03 OH 0.750 125,000.00
Kepala Tukang L.11 OH 0.080 130,000.00
Mandor L.15 OH 0.006 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Almn Gelombang tbl 0.55 Lbr 1.050 112,000.00
Paku Hak Panjang 15 cm kg 0.020 10,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.5.2.41 Pemasangan 1 m' Nok Aluminium


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.100 115,000.00
Tukang Kayu L.03 OH 1.000 125,000.00
Kepala Tukang L.11 OH 0.100 130,000.00
Mandor L.15 OH 0.050 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Nok Standar 40 x 18 Bh 1.200 25,000.00
Paku Hak Panjang 15 cm kg 0.040 10,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU

A. 4.6.1.1 1 m3 Membuat dan memasang kusen pintu/jendela kayu Klass I


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 7.000 115,000.00
Tukang Kayu L.03 OH 21.000 125,000.00
Kepala Tukang L.03 OH 2.100 130,000.00
Mandor L.04 OH 0.350 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Kelas I m3 1.100 5,000,000.00
Paku kg 1.250 15,000.00
Lem Kayu kg 1.000 25,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.6.1.10 1 m2 Memasang jalusi kusen kayu Klas I & II


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.670 115,000.00
Tukang Kayu L.03 OH 0.400 125,000.00
Kepala Tukang L.03 OH 0.200 130,000.00
Mandor L.04 OH 0.335 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Papan Kayu m3 0.020 5,000,000.00
Paku Kecil kg 0.150 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.6.1.13 Pemasangan 1 m3 Konstruksi Kuda-Kuda Konvesional, Kayu Klas II
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 4.000 115,000.00
Tukang Kayu L.03 OH 12.000 125,000.00
Kepala Tukang L.03 OH 1.200 130,000.00
Mandor L.04 OH 0.200 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Balok Kayu m3 1.100 5,000,000.00
Besi Strip tebal 5 mm kg 15.000 32,000.00
Paku 12 cm kg 5.600 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.6.1.15 Pemasangan 1 m3 Konstruksi Gordeng Kayu Klas II


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 6.700 115,000.00
Tukang Kayu L.03 OH 20.100 125,000.00
Kepala Tukang L.03 OH 2.010 130,000.00
Mandor L.04 OH 0.335 115,000.00
Jumlah Tenaga Kerja
B BAHAN `
Balok Kayu m3 1.100 5,000,000.00
Besi Strip tebal 5 mm kg 15.000 32,000.00
Paku 12 cm kg 3.000 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.6.1.17 Pemasangan 1 m2 rangka atap genteng beton, kayu Klas II
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.100 115,000.00
Tukang Kayu L.03 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 130,000.00
Mandor L.04 OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN `
Kaso 5 x 7 cm m3 0.014 1,800,000.00
Reng (3 x 4) cm kg 0.057 1,800,000.00
Paku 5 dan 10 cm kg 0.250 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm , kayu Klas II


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.200 115,000.00
Tukang Kayu L.03 OH 0.300 125,000.00
Kepala Tukang L.03 OH 0.030 130,000.00
Mandor L.04 OH 0.010 115,000.00
Jumlah Tenaga Kerja
B BAHAN `
Kaso 5 x 7 cm m3 0.0163 1,800,000.00
Paku 7 dan 10 cm kg 0.250 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.21 1 m1 Memasang Lisplank uk. (2.5x25) cm kayu Klas I & II
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.100 115,000.00
Tukang Kayu L.03 OH 0.200 125,000.00
Kepala Tukang L.03 OH 0.020 130,000.00
Mandor L.04 OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN `
Papan Kayu klas II m3 0.0108 1,800,000.00
Paku kg 0.100 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A. 4.6.2.2 Pemasangan 1 buah kunci tanam biasa


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.010 115,000.00
Tukang Kayu L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.050 130,000.00
Mandor L.04 OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kunci Tanam Biasa Bh 1.000 154,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.6.2.4 1 buah Pasang kunci silinder
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.005 115,000.00
Tukang Kayu L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.005 130,000.00
Mandor L.04 OH 0.0030 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kunci Silinder Bh 1.000 80,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.12 1 buah Pasang pegangan pintu/ door holder


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.050 115,000.00
Tukang Kayu L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.050 130,000.00
Mandor L.04 OH 0.0025 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pegangan Pintu Bh 1.000 100,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.5 1 buah Pasang engsel pintu
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.015 115,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.00075 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Engsel Pintu Bh 1.000 12,650.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.7 1 buah Pasang engsel jendela


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.015 115,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.00075 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Engsel Jendela Bh 1.000 10,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.8b 1 buah Pasang grendel jendela
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.015 115,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.00075 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Grendel Jendela Bh 1.000 20,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.12a 1 buah Pasang Pegangan Jendela


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.050 115,000.00
Tukang Kayu L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.050 130,000.00
Mandor L.04 OH 0.00300 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pegangan Jendela Bh 1.000 20,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.8a 1 buah Pasang grendel Pintu


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.015 115,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.00800 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Grendel Pintu Bh 1.000 25,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.9 1 buah Pasang Hak Angin


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.015 115,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.00075 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Hak angin Bh 1.000 15,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.6.2.9 Pemasangan 1 buah kait angin
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.015 115,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.008 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kait Angin Bh 1.000 10,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.6.2.17 Pemasangan 1 m2 kaca tebal 5mm


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.015 115,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.00080 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kaca Tebal 5 mm m2 1.100 57,500.00
Sealant kg 0.050 22,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.17.a 1 m2 Pasang kaca Reflektif 5 mm


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.015 115,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 130,000.00
Mandor L.04 OH 0.00075 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kaca Tebal 5 mm m2 1.100 57,500.00
Sealant kg 0.050 22,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN

A. 4.7.1.4 1 m2 Mengecat bidang kayu baru


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.070 115,000.00
Tukang Cat L.02 OH 0.009 125,000.00
Kepala Tukang L.03 OH 0.006 130,000.00
Mandor L.04 OH 0.003 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Cat Menie kg 0.200 21,000.00
Plamir kg 0.150 20,000.00
Cat Dasar kg 0.170 20,000.00
Cat Penutup kg 0.260 20,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.7.1.5 Pengecatan 1 m2 bidang kayu Lama (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.070 115,000.00
Tukang Cat L.02 OH 0.009 125,000.00
Kepala Tukang L.03 OH 0.006 130,000.00
Mandor L.04 OH 0.003 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Cat Menie kg 0.200 21,000.00
Plamur kg 0.150 20,000.00
Cat Dasar kg 0.170 20,000.00
Cat Penutup kg 0.260 20,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
Cat 0,5 x 26,100.00
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.7.1.8 Pelaburan 1 m2 bidang kayu dengan cat residu dan Ter


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.100 115,000.00
Mandor L.04 OH 0.006 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Residu atau ter Liter 0.350 7,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.7.1.10 1 m2 Mengecat bidang tembok baru
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.020 115,000.00
Tukang Cat L.02 OH 0.063 125,000.00
Kepala Tukang L.03 OH 0.0063 130,000.00
Mandor L.04 OH 0.003 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Plamur kg 0.100 20,000.00
Cat Dasar kg 0.100 20,000.00
Cat Penutup kg 0.260 20,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.7.1.11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.028 115,000.00
Tukang Cat L.02 OH 0.042 125,000.00
Kepala Tukang L.03 OH 0.0042 130,000.00
Mandor L.04 OH 0.003 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Cat Dasar kg 0.120 20,000.00
Cat Penutup kg 0.180 20,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.14 Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.070 0.00
Tukang Cat L.02 OH 0.009 0.00
Kepala Tukang L.03 OH 0.0060 0.00
Mandor L.04 OH 0.003 0.00
Jumlah Tenaga Kerja
B BAHAN
Cat Menie Kg 0.200 21,000.00
Plamir Kg 0.150 20,000.00
Cata Kayu Dasar Kg 0.170 20,000.00
Cat Mengkilat Kg 0.260 44,000.00
Kuas Bh 0.010 10,000.00
Tiner Liter 0.013 25,000.00
amplas Lbr 0.200 5,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

A. 5.1.1.5 Pemasangan 1 Buah Wastafel


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.200 115,000.00
Tukang L.02 OH 1.450 125,000.00
Kepala Tukang L.03 OH 0.1500 130,000.00
Mandor L.04 OH 0.060 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Washtafel Unit 1.200 1,500,000.00
Sement Portland Kg 6.000 1,350.00
Pasir Pasang M3 0.010 110,000.00
Perlengkapan Ls 0.1200 20,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.87 1 m2 Memasang paving block
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.250 115,000.00
Tukang L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.0250 130,000.00
Mandor L.04 OH 0.003 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Paving Block M2 1.010 150,000.00
Pasir Urug M3 0.100 100,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.11 Memasang 1 m kusen pintu alluminium


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.043 115,000.00
Tukang L.02 OH 0.800 125,000.00
Kepala Tukang L.03 OH 0.0800 130,000.00
Mandor L.04 OH 0.004 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Profil Alumunium m 1.100 100,000.00
Skrup Fixer Bh 2.000 1,000.00
Sealant Tube 0.060 20,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
#REF! Memasang 1 m² pintu kaca rangka alluminium
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.085 115,000.00
Tukang L.02 OH 0.085 125,000.00
Kepala Tukang L.03 OH 0.0090 130,000.00
Mandor L.04 OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pintu Alumunium m 4.400 110,000.00
Profil Kaca m 4.500 60,000.00
Sealant Tube 0.270 115,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

#REF! Memasang 1 m² pintu alluminium strip lebar 8 cm


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.085 115,000.00
Tukang L.02 OH 0.085 125,000.00
Kepala Tukang L.03 OH 0.0090 130,000.00
Mandor L.04 OH 0.004 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Profil Alumunium m 4.400 100,000.00
alumunium Strip m 14.600 25,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
#REF! 1 buah Pasang kunci tanam biasa (kecil)
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.005 115,000.00
Tukang L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.0500 130,000.00
Mandor L.04 OH 0.003 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kunci Tanam Kecil Bh 50,000.000 0.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

#REF! 1 buah Pasang pegangan jendela/handel


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.050 115,000.00
Tukang Kayu L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.050 130,000.00
Mandor L.04 OH 0.0030 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pegangan Jendela Bh 1.000 25,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
#REF! 1 m3 Membuat dan memasang kusen pintu/jendela kayu Klas II
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 6.000 115,000.00
Tukang Kayu L.03 OH 18.000 125,000.00
Kepala Tukang L.03 OH 1.800 130,000.00
Mandor L.04 OH 0.300 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Kelas II m3 1.200 3,000,000.00
Paku kg 1.250 15,000.00
Lem Kayu kg 1.000 25,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.1 1 buah Pasang kloset duduk


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 3.300 115,000.00
Tukang Kayu L.03 OH 1.100 125,000.00
Kepala Tukang L.03 OH 0.001 130,000.00
Mandor L.04 OH 0.160 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kloset Duduk m3 1.000 2,500,000.00
Perlengkapan kg 60% H
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.14 1 buah Pasang kloset duduk


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.010 115,000.00
Tukang Kayu L.03 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 130,000.00
Mandor L.04 OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Floor Drain m3 1.000 20,000.00

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.5 1 buah Pasang Washtafel


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.200 115,000.00
Tukang Kayu L.03 OH 0.750 125,000.00
Kepala Tukang L.03 OH 0.070 130,000.00
Mandor L.04 OH 0.110 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Washtafel Bh 1.000 1,500,000.00
Perlengkapan 12 % H
Pc Kg 6.000 1,350.00
Pasir Pasang M3 0.010 110,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.32 1 m' Pasangan pipa PVC tipe AW diameter 4"


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.081 115,000.00
Tukang Kayu L.03 OH 0.135 125,000.00
Kepala Tukang L.03 OH 0.0135 130,000.00
Mandor L.04 OH 0.0040 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pipa PVC 4" m 1.200 30,000.00
Perlengkapan 35 % H
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.31 1 m' Pasangan pipa PVC tipe AW diameter 3"


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.081 115,000.00
Tukang Kayu L.03 OH 0.135 125,000.00
Kepala Tukang L.03 OH 0.0135 130,000.00
Mandor L.04 OH 0.0040 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pipa PVC 3" m 1.200 25,000.00
Perlengkapan 35 % H
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.26.a 1 m' Pasangan pipa PVC tipe AW diameter 1/2"


No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.036 115,000.00
Tukang Kayu L.03 OH 0.060 125,000.00
Kepala Tukang L.03 OH 0.0060 130,000.00
Mandor L.04 OH 0.0020 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pipa PVC 1/2" m 1.200 12,000.00
Perlengkapan 35 % H
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga

11,500.00
12,500.00
1,300.00
575.00
25,875.00

600,000.00
300.00
35,000.00
635,300.00

661,175.00
99,176.25
760,351.25

NAH

Jumlah Harga

115,000.00
3,680.00
118,680.00

118,680.00
11,868.00
130,548.00
Jumlah Harga

86,250.00
2,875.00
89,125.00

89,125.00
8,912.50
98,037.50

Jumlah Harga

103,500.00
5,175.00
108,675.00

108,675.00
10,867.50
119,542.50

Jumlah Harga

120,750.00
7,705.00
128,455.00
128,455.00
12,845.50
141,300.50

Jumlah Harga

57,500.00
5,750.00
63,250.00

63,250.00
6,325.00
69,575.00
Jumlah Harga

57,500.00
5,750.00
63,250.00

63,250.00
9,487.50
72,737.50

Jumlah Harga

34,500.00
1,150.00
35,650.00

120,000.00
120,000.00

155,650.00
15,565.00
171,215.00
Jumlah Harga

28,750.00
2,875.00
31,625.00

72,000.00
72,000.00

103,625.00
10,362.50
113,987.50

NDASI

Jumlah Harga

172,500.00
93,750.00
9,750.00
8,625.00
284,625.00

132,000.00
220,050.00
57,200.00
409,250.00

693,875.00
69,387.50
763,262.50
Jumlah Harga

89,700.00
48,750.00
5,070.00
4,485.00
148,005.00

132,000.00
43,200.00
175,200.00

323,205.00
32,320.50
355,525.50

SP : 2PB : 3KR dan 40% Batu Belah


Jumlah Harga

391,000.00
106,250.00
11,050.00
19,550.00
527,850.00

52,800.00
261,900.00
40,560.00
112,320.00
1,512,000.00
27,000.00
2,006,580.00

2,534,430.00
253,443.00
2,787,873.00
Jumlah Harga

276,000.00
100,000.00
10,400.00
13,685.00
400,085.00

49,500.00
261,900.00
40,560.00
112,320.00
464,280.00

864,365.00
129,654.75
994,019.75

TON

Jumlah Harga

138,000.00
25,000.00
2,600.00
6,900.00
172,500.00

310,500.00
82,921.43
182,577.78
40,000.00
615,999.21

788,499.21
118,274.88
906,774.09
ump (12 ± 2) cm, w/c = 0.78
Jumlah Harga

189,750.00
34,375.00
3,640.00
9,545.00
237,310.00

372,600.00
76,885.71
179,911.11
43,000.00
672,396.83

909,706.83
90,970.68
1,000,677.51

lump (12 ± 2) cm, w/c = 0.72


Jumlah Harga

189,750.00
34,375.00
3,640.00
9,545.00
237,310.00

403,650.00
74,192.86
180,800.00
43,000.00
701,642.86

938,952.86
140,842.93
1,079,795.79
100),slump (3 - 6) cm, w/c = 0.87
Jumlah Harga

138,000.00
25,000.00
2,600.00
6,900.00
172,500.00

310,500.00
82,921.43
182,577.78
40,000.00
615,999.21

788,499.21
78,849.92
867,349.13

slump (12 ± 2) cm, w/c = 0.66


Jumlah Harga

189,750.00
34,375.00
3,640.00
9,545.00
237,310.00

440,100.00
70,571.43
182,933.33
43,000.00
736,604.76

973,914.76
97,391.48
1,071,306.24
slump (12 ± 2) cm, w/c = 0.61
Jumlah Harga

189,750.00
34,375.00
3,640.00
9,545.00
237,310.00

475,200.00
67,878.57
183,288.89
43,000.00
769,367.46

1,006,677.46
151,001.62
1,157,679.08

mp (12 ± 2) cm, w/c = 0.58


Jumlah Harga

189,750.00
34,375.00
3,640.00
9,545.00
237,310.00

500,850.00
64,814.29
186,133.33
43,000.00
794,797.62

1,032,107.62
103,210.76
1,135,318.38
slump (12 ± 2) cm, w/c = 0.56
Jumlah Harga

189,750.00
34,375.00
3,640.00
9,545.00
237,310.00

518,400.00
64,257.14
184,711.11
43,000.00
810,368.25

1,047,678.25
104,767.83
1,152,446.08

ump (12 ± 2) cm, w/c = 0.53


Jumlah Harga

189,750.00
34,375.00
3,640.00
9,545.00
237,310.00

548,100.00
63,514.29
182,400.00
43,000.00
837,014.29

1,074,324.29
161,148.64
1,235,472.93
p (12 ± 2) cm, w/c = 0.52
Jumlah Harga

189,750.00
34,375.00
3,640.00
9,545.00
237,310.00

557,550.00
63,235.71
181,511.11
43,000.00
845,296.83

1,082,606.83
162,391.02
1,244,997.85

slump (12 ± 2) cm, w/c = 0.49


Jumlah Harga

241,500.00
43,750.00
4,550.00
12,075.00
301,875.00

592,650.00
62,214.29
178,844.44
43,000.00
876,708.73

1,178,583.73
176,787.56
1,355,371.29
p (12 ± 2) cm, w/c = 0.48
Jumlah Harga

241,500.00
43,750.00
4,550.00
12,075.00
301,875.00

604,800.00
61,935.71
177,777.78
43,000.00
887,513.49

1,189,388.49
178,408.27
1,367,796.77

Jumlah Harga

8,050.00
8,750.00
910.00
460.00
18,170.00

126,000.00
2,250.00
128,250.00

146,420.00
14,642.00
161,062.00
16,106.20
Jumlah Harga

8,050.00
8,750.00
910.00
460.00
18,170.00

131,250.00
2,250.00
133,500.00

151,670.00
15,167.00
166,837.00
16,683.70

Jumlah Harga

59,800.00
32,500.00
3,380.00
2,990.00
98,670.00

100,000.00
4,500.00
1,000.00
105,500.00

204,170.00
20,417.00
224,587.00
Jumlah Harga

59,800.00
32,500.00
3,380.00
2,990.00
98,670.00

112,500.00
4,500.00
1,000.00
118,000.00

216,670.00
21,667.00
238,337.00

Jumlah Harga

75,900.00
41,250.00
4,290.00
3,795.00
125,235.00

100,000.00
6,000.00
2,000.00
45,000.00
49,000.00

15,120.000
217,120.00

342,355.00
34,235.50
376,590.50
Jumlah Harga

75,900.00
41,250.00
4,290.00
3,795.00
125,235.00

100,000.00
6,000.00
2,000.00
54,000.00
49,000.00

15,120.000
226,120.00

351,355.00
35,135.50
386,490.50
Jumlah Harga

75,900.00
41,250.00
4,290.00
3,795.00
125,235.00

100,000.00
6,000.00
2,000.00
45,000.00
49,000.00

45,360.000
247,360.00

372,595.00
37,259.50
409,854.50
Jumlah Harga

75,900.00
41,250.00
4,290.00
3,795.00
125,235.00

75,000.00
6,000.00
2,000.00
60,000.00
49,000.00

22,680.000

20,000.000
234,680.00

359,915.00
53,987.25
413,902.25
Jumlah Harga

75,900.00
41,250.00
4,290.00
3,795.00
125,235.00

75,000.00
6,000.00
1,500.00
45,000.00
49,000.00

15,120.000
191,620.00

316,855.00
31,685.50
348,540.50

Jumlah Harga

17,250.00
6,250.00
650.00
920.00
25,070.00

66,000.00
9,000.00

3,780.000
78,780.00

103,850.00
15,577.50
119,427.50
ALUMINIUM

Jumlah Harga

6,900.00
7,500.00
780.00
345.00
15,525.00

41,400.00
41,400.00

56,925.00
5,692.50
62,617.50

Jumlah Harga

16,100.00
50,000.00
5,200.00
8,050.00
79,350.00

8,400.00
5,250.00
400.00
400.00
14,450.00

93,800.00
9,380.00
103,180.00
Jumlah Harga

11,500.00
12,500.00
130.00
575.00
24,705.00

8,000.00
3,000.00
11,000.00

120,000.00
120,000.00
155,705.00
23,355.75
179,060.75

Jumlah Harga

4,600.00
2,500.00
260.00
230.00
7,590.00

14,000.00
2,400.00
1,200.00
17,600.00

25,500.00
25,500.00
50,690.00
7,603.50
58,293.50
odul 60 x 60 cm, plafont
Jumlah Harga

40,250.00
43,750.00
4,550.00
2,070.00
90,620.00

100,000.00

25,000.00

125,000.00

0.00
215,620.00
32,343.00
247,963.00

AN DINDING

bal 1/2 batu campuran 1SP : 2PP


Jumlah Harga

34,500.00
12,500.00
1,300.00
1,725.00
50,025.00

46,200.00
25,582.50
4,180.00
75,962.50

125,987.50
12,598.75
138,586.25
bal 1/2 batu campuran 1SP : 3PP
Jumlah Harga

34,500.00
12,500.00
1,300.00
1,725.00
50,025.00

46,200.00
19,399.50
4,400.00
69,999.50

120,024.50
18,003.68
138,028.18

bal 1/2 batu campuran 1SP : 4PP


Jumlah Harga

34,500.00
12,500.00
1,300.00
1,725.00
50,025.00

46,200.00
15,525.00
4,730.00
66,455.00

116,480.00
11,648.00
128,128.00
TERAN

Jumlah Harga

34,500.00
18,750.00
1,950.00
1,725.00
56,925.00

20,930.40
1,760.00
22,690.40

79,615.40
11,942.31
91,557.71

Jumlah Harga

34,500.00
18,750.00
1,950.00
1,725.00
56,925.00

13,802.40
2,200.00
16,002.40

72,927.40
7,292.74
80,220.14
Jumlah Harga

29,900.00
25,000.00
2,600.00
1,495.00
58,995.00

13,996.80
3,410.00
17,406.80

76,401.80
11,460.27
87,862.07

Jumlah Harga

46,000.00
25,000.00
2,600.00
2,530.00
76,130.00

11,232.00
3,520.00
14,752.00

90,882.00
9,088.20
99,970.20
Jumlah Harga

34,500.00
18,750.00
1,950.00
1,725.00
56,925.00

8,424.00
2,640.00
11,064.00

67,989.00
6,798.90
74,787.90

Jumlah Harga

23,000.00
12,500.00
1,300.00
1,150.00
37,950.00

4,387.50
4,387.50

42,337.50
4,233.75
46,571.25
AN PENUTUP DINDING

Jumlah Harga

71,300.00
43,750.00
4,550.00
3,450.00
123,050.00

52,480.00
13,500.00
4,950.00
2,700.00
73,630.00

196,680.00
19,668.00
216,348.00

Jumlah Harga

28,750.00
15,625.00
1,690.00
1,495.00
47,560.00

187,560.00
12,960.00
4,950.00
2,700.00
208,170.00

255,730.00
25,573.00
281,303.00
Jumlah Harga

28,750.00
15,625.00
1,690.00
1,495.00
47,560.00

171,930.00
12,960.00
4,950.00
2,700.00
192,540.00

240,100.00
24,010.00
264,110.00

Jumlah Harga

80,500.00
43,750.00
4,550.00
3,450.00
132,250.00

60,917.40
13,500.00
4,950.00
2,700.00
82,067.40

214,317.40
21,431.74
235,749.14

Jumlah Harga

10,350.00
56,250.00
5,850.00
5,175.00
77,625.00

63,600.00
12,555.00
1,980.00
3,492.00
81,627.00

159,252.00
15,925.20
175,177.20
Jumlah Harga

80,500.00
43,750.00
4,550.00
3,450.00
132,250.00

229,600.00
11,056.50
4,950.00
2,916.00
248,522.50

380,772.50
38,077.25
418,849.75
Jumlah Harga

10,350.00
56,250.00
5,850.00
5,175.00
77,625.00

16,944.58
12,555.00
1,980.00
2,793.60
34,273.18

111,898.18
11,189.82
123,088.00

Jumlah Harga

29,900.00
16,250.00
1,690.00
1,495.00
49,335.00

40,000.00
13,500.00
4,950.00
2,700.00
61,150.00

110,485.00
16,572.75
127,057.75
Jumlah Harga

103,500.00
56,250.00
5,850.00
5,175.00
170,775.00

56,750.00
12,555.00
1,980.00
3,492.00
74,777.00

245,552.00
36,832.80
282,384.80

Jumlah Harga

10,350.00
56,250.00
5,850.00
5,175.00
77,625.00

29,175.00
12,555.00
1,980.00
2,793.60
46,503.60

124,128.60
12,412.86
136,541.46
Jumlah Harga

40,250.00
21,875.00
2,210.00
230.00
64,565.00

50,600.00
6,250.00
56,850.00

121,415.00
18,212.25
139,627.25

NGIT (PLAFOND)

Jumlah Harga

11,500.00
12,500.00
1,300.00
575.00
25,875.00

37,500.00
420.00
37,920.00

63,795.00
6,379.50
70,174.50
Jumlah Harga

17,250.00
37,500.00
3,900.00
1,150.00
59,800.00

10,800.00
3,000.00
13,800.00

73,600.00
7,360.00
80,960.00
120 x 240) cm, tebal 9 mm
Jumlah Harga

11,500.00
6,250.00
650.00
575.00
18,975.00

29,120.00
55.00
29,175.00

48,150.00
4,815.00
52,965.00

Jumlah Harga

5,750.00
6,250.00
650.00
345.00
12,995.00

21,000.00
150.00
21,150.00

34,145.00
3,414.50
37,559.50
TUP ATAP

Jumlah Harga

23,000.00
12,500.00
1,300.00
1,150.00
37,950.00

82,500.00
450.00
82,950.00

120,900.00
18,135.00
139,035.00

Jumlah Harga

23,000.00
12,500.00
1,300.00
115.00
36,915.00

34,000.00
5,000.00
39,000.00

75,915.00
7,591.50
83,506.50
Jumlah Harga

23,000.00
12,500.00
1,300.00
1,150.00
37,950.00

86,700.00
4,000.00
90,700.00

128,650.00
12,865.00
141,515.00
Jumlah Harga

46,000.00
25,000.00
2,600.00
2,300.00
75,900.00

70,000.00
1,250.00
14,580.00
3,520.00
1,800.00
91,150.00

167,050.00
25,057.50
192,107.50

Jumlah Harga

16,100.00
50,000.00
5,200.00
8,050.00
79,350.00

30,000.00
1,250.00
31,250.00

110,600.00
11,060.00
121,660.00
Jumlah Harga

13,800.00
7,500.00
780.00
690.00
22,770.00

59,500.00
500.00
60,000.00

82,770.00
12,415.50
95,185.50

Jumlah Harga

28,750.00
18,750.00
1,950.00
1,495.00
50,945.00

20,000.00
15,000.00
2,800.00
2,200.00
40,000.00

90,945.00
9,094.50
100,039.50
Jumlah Harga

17,250.00
93,750.00
10,400.00
690.00
122,090.00

117,600.00
200.00
117,800.00

239,890.00
35,983.50
275,873.50

Jumlah Harga

11,500.00
125,000.00
13,000.00
5,750.00
155,250.00

30,000.00
400.00
30,400.00

185,650.00
27,847.50
213,497.50
KAYU

Jumlah Harga

805,000.00
2,625,000.00
273,000.00
40,250.00
3,743,250.00

5,500,000.00
18,750.00
25,000.00
5,543,750.00

9,287,000.00
928,700.00
10,215,700.00

Jumlah Harga

77,050.00
50,000.00
26,000.00
38,525.00
191,575.00

100,000.00
2,250.00
102,250.00

293,825.00
29,382.50
323,207.50
nal, Kayu Klas II
Jumlah Harga

460,000.00
1,500,000.00
156,000.00
23,000.00
2,139,000.00

5,500,000.00

84,000.00
5,584,000.00

7,723,000.00
772,300.00
8,495,300.00

Jumlah Harga

770,500.00
2,512,500.00
261,300.00
38,525.00
3,582,825.00

5,500,000.00

45,000.00
5,545,000.00

9,127,825.00
912,782.50
10,040,607.50
Jumlah Harga

11,500.00
12,500.00
1,300.00
575.00
25,875.00

25,200.00
102,600.00
3,750.00
131,550.00

157,425.00
23,613.75
181,038.75

, kayu Klas II
Jumlah Harga

23,000.00
37,500.00
3,900.00
1,150.00
65,550.00

29,340.00
3,750.00
33,090.00

98,640.00
9,864.00
108,504.00
Jumlah Harga

11,500.00
25,000.00
2,600.00
575.00
39,675.00

19,440.00
1,500.00
20,940.00

60,615.00
6,061.50
66,676.50

DAN KACA

Jumlah Harga

1,150.00
62,500.00
6,500.00
575.00
70,725.00

154,000.00
154,000.00

224,725.00
22,472.50
247,197.50
Jumlah Harga

575.00
62,500.00
650.00
345.00
64,070.00

80,000.00
80,000.00

144,070.00
14,407.00
158,477.00

Jumlah Harga

5,750.00
62,500.00
6,500.00
287.50
75,037.50

100,000.00
100,000.00

175,037.50
17,503.75
192,541.25
Jumlah Harga

1,725.00
18,750.00
1,950.00
86.25
22,511.25

12,650.00
12,650.00

35,161.25
3,516.13
38,677.38

Jumlah Harga

1,725.00
18,750.00
1,950.00
86.25
22,511.25

10,000.00
10,000.00

32,511.25
3,251.13
35,762.38
Jumlah Harga

1,725.00
18,750.00
1,950.00
86.25
22,511.25

20,000.00
20,000.00

42,511.25
4,251.13
46,762.38

Jumlah Harga

5,750.00
62,500.00
6,500.00
345.00
75,095.00

20,000.00
20,000.00

95,095.00
9,509.50
104,604.50

Jumlah Harga

1,725.00
18,750.00
1,950.00
920.00
23,345.00
25,000.00
25,000.00

48,345.00
4,834.50
53,179.50

Jumlah Harga

1,725.00
18,750.00
1,950.00
86.25
22,511.25

15,000.00
15,000.00

37,511.25
3,751.13
41,262.38
Jumlah Harga

1,725.00
18,750.00
1,950.00
920.00
23,345.00

10,000.00
10,000.00

33,345.00
5,001.75
38,346.75

Jumlah Harga

1,725.00
18,750.00
1,950.00
92.00
22,517.00

63,250.00
1,100.00
64,350.00

86,867.00
8,686.70
95,553.70

Jumlah Harga

1,725.00
18,750.00
1,950.00
86.25
22,511.25
63,250.00
1,100.00
64,350.00

86,861.25
8,686.13
95,547.38
GECATAN

Jumlah Harga

8,050.00
1,125.00
780.00
345.00
10,300.00

4,200.00
3,000.00
3,400.00
5,200.00
15,800.00

26,100.00
2,610.00
28,710.00
, 1 lapis cat dasar, 2 lapis cat penutup)
Jumlah Harga

8,050.00
1,125.00
780.00
345.00
10,300.00

4,200.00
3,000.00
3,400.00
5,200.00
15,800.00

26,100.00
13,050.00
1,957.50
15,007.50

Jumlah Harga

11,500.00
690.00
12,190.00

2,450.00
2,450.00

14,640.00
2,196.00
16,836.00
Jumlah Harga

2,300.00
7,875.00
819.00
345.00
11,339.00

2,000.00
2,000.00
5,200.00
9,200.00

20,539.00
2,053.90
22,592.90

apis cat penutup)


Jumlah Harga

3,220.00
5,250.00
546.00
345.00
9,361.00

2,400.00
3,600.00
6,000.00

15,361.00
2,304.15
17,665.15
1 lapis cat dasar, 2 lapis cat penutup)
Jumlah Harga

0.00
0.00
0.00
0.00
0.00

4,200.00
3,000.00
3,400.00
11,440.00
100.00
325.00
1,000.00
23,465.00

23,465.00
3,519.75
26,984.75

Jumlah Harga

138,000.00
181,250.00
19,500.00
6,900.00
345,650.00

1,800,000.00
8,100.00
1,100.00
2,400.00
1,811,600.00

2,157,250.00
215,725.00
2,372,975.00
Jumlah Harga

28,750.00
62,500.00
3,250.00
345.00
94,845.00

151,500.00
10,000.00
161,500.00

256,345.00
25,634.50
281,979.50

Jumlah Harga

4,945.00
100,000.00
10,400.00
460.00
115,805.00

110,000.00
2,000.00
1,200.00
113,200.00

229,005.00
22,900.50
251,905.50
Jumlah Harga

9,775.00
10,625.00
1,170.00
575.00
22,145.00

484,000.00
270,000.00
31,050.00
785,050.00

807,195.00
80,719.50
887,914.50

Jumlah Harga

9,775.00
10,625.00
1,170.00
460.00
22,030.00

440,000.00
365,000.00
805,000.00

827,030.00
82,703.00
909,733.00
Jumlah Harga

575.00
62,500.00
6,500.00
345.00
69,920.00

0.00
0.00

69,920.00
6,992.00
76,912.00

Jumlah Harga

5,750.00
62,500.00
6,500.00
345.00
75,095.00

25,000.00
25,000.00

100,095.00
10,009.50
110,104.50
Jumlah Harga

690,000.00
2,250,000.00
234,000.00
34,500.00
3,208,500.00

3,600,000.00
18,750.00
25,000.00
3,643,750.00

6,852,250.00
685,225.00
7,537,475.00

Jumlah Harga

379,500.00
137,500.00
130.00
18,400.00
535,530.00

2,500,000.00
1,500,000.00
4,000,000.00

4,535,530.00
453,553.00
4,989,083.00

Jumlah Harga

1,150.00
12,500.00
1,300.00
575.00
15,525.00

20,000.00

20,000.00

35,525.00
3,552.50
39,077.50

Jumlah Harga

138,000.00
93,750.00
9,100.00
12,650.00
253,500.00

1,500,000.00
180,000.00
8,100.00
900,000.00
2,588,100.00

2,841,600.00
284,160.00
3,125,760.00

Jumlah Harga

9,315.00
16,875.00
1,755.00
460.00
28,405.00

36,000.00
10,500.00
46,500.00

74,905.00
7,490.50
82,395.50

Jumlah Harga

9,315.00
16,875.00
1,755.00
460.00
28,405.00

30,000.00
8,750.00
38,750.00

67,155.00
6,715.50
73,870.50

Jumlah Harga

4,140.00
7,500.00
780.00
230.00
12,650.00

14,400.00
4,200.00
18,600.00

31,250.00
3,125.00
34,375.00
#REF!
1M3 Beton Bertulang Plat pondasi tapak 60 x 60 cm'
1.0000 m3 A. 4.1.1.8 Rp 1,152,446.08 Rp 1,152,446.08
128.8975 Kg A. 4.1.1.17a Rp 16,683.70 Rp 2,150,487.22
Kg A. 4.1.1.17 Rp 16,106.20 Rp -
1.250 m2 A. 4.1.1.20 Rp 224,587.00 Rp 280,733.75
1.000 Ls Pekerjaan lain - lain Rp 50,000.00 Rp 50,000.00
JUMLAH Rp 3,633,667.05
HARGA SATUAN Rp 3,633,600.00

#REF!
1M3 Sloof Beton Bertulang 20 x 25 cm' (S1)
1.0000 m3 A. 4.1.1.8 Rp 1,152,446.08 Rp 1,152,446.08
105.2224 Kg A. 4.1.1.17a Rp 16,683.70 Rp 1,755,498.95
61.6538 Kg A. 4.1.1.17 Rp 16,106.20 Rp 993,008.43
4.167 m2 A. 4.1.1.21 Rp 238,337.00 Rp 993,150.28
1.000 Ls Pekerjaan lain - lain Rp 50,000.00 Rp 50,000.00
JUMLAH Rp 4,944,103.75
HARGA SATUAN Rp 4,944,100.00

#REF!
1M3 Balok Latai 15 x 15 cm'
1.0000 m3 A.4.1.1.5 Rp 1,071,306.24 Rp 1,071,306.24
Kg A. 4.1.1.17a Rp 16,683.70 Rp -
73.2173 Kg A. 4.1.1.17 Rp 16,106.20 Rp 1,179,252.48
3.333 m2 A. 4.1.1.23 Rp 386,490.50 Rp 1,288,172.84
1.000 Ls Pekerjaan lain - lain Rp 50,000.00 Rp 50,000.00
JUMLAH Rp 3,588,731.55
HARGA SATUAN Rp 3,588,700.00

#REF!
1M3 Kolom Beton Bertulang 15 x 15 cm' (K3)
1.0000 m3 A. 4.1.1.8 Rp 1,152,446.08 Rp 1,152,446.08
118.3752 Kg A. 4.1.1.17a Rp 16,683.70 Rp 1,974,936.32
30.3976 Kg A. 4.1.1.17 Rp 16,106.20 Rp 489,589.83
8.000 m2 A. 4.1.1.22 Rp 376,590.50 Rp 3,012,724.00
1.000 Ls Pekerjaan lain - lain Rp 50,000.00 Rp 50,000.00
JUMLAH Rp 6,679,696.23
HARGA SATUAN Rp 6,679,600.00

#REF!
1M3 Kolom Beton Bertulang 20 x 20 cm' (K2)
1.0000 m3 A. 4.1.1.8 Rp 1,152,446.08 Rp 1,152,446.08
82.6160 Kg A. 4.1.1.17a Rp 16,683.70 Rp 1,378,340.56
11.0977 Kg A. 4.1.1.17 Rp 16,106.20 Rp 178,741.78
5.000 m2 A. 4.1.1.22 Rp 376,590.50 Rp 1,882,952.50
1.000 Ls Pekerjaan lain - lain Rp 50,000.00 Rp 50,000.00
JUMLAH Rp 4,642,480.91
HARGA SATUAN Rp 4,642,400.00
#REF!
1M3 Balok Latai 15 x 15 cm'
1.0000 m3 A. 4.1.1.8 Rp 1,152,446.08 Rp 1,152,446.08
82.2990 Kg A. 4.1.1.17a Rp 16,683.70 Rp 1,373,051.83
57.5440 Kg A. 4.1.1.17 Rp 16,106.20 Rp 926,815.17
4.714 m2 A. 4.1.1.23 Rp 386,490.50 Rp 1,821,916.22
1.000 Ls Pekerjaan lain - lain Rp 50,000.00 Rp 50,000.00
JUMLAH Rp 5,324,229.30
HARGA SATUAN Rp 5,324,200.00
DAFTAR HARGA UPAH DAN BAHAN

NO. URAIAN SATUAN HARGA SATUAN (Rp.)

A. UPAH
1 Kepala Tukang Hari 130,000.00
2 Mandor Hari 115,000.00
3 Pekerja / Laden Tukang Hari 115,000.00
4 Tukang Hari 125,000.00

B. BAHAN
1 Air Liter 200.00
2 Atap Seng Genteng Metal 0,30 Lembar 50,000.00
3 Batu Bata Buah 660.00
4 Balok Kayu Kelas I M3 5,000,000.00
5 Batu Kali/Batu Belah (Sungai/Gunung) 15/20 Cm M3 110,000.00
6 Batu Belah 5/7 Cm M3 285,000.00
7 Besi Beton Polos Kg 12,000.00
8 Besi Beton Ulir Kg 12,500.00
9 Cat Dasar Kg 20,000.00
10 Cat Tembok Kg 20,000.00
11 Cat Kayu/Minyak Kg 44,000.00
12 Cat Menie Besi Kg 21,000.00
13 Kayu Bakau/Dolken Kayu Ø 8 - 10, 4 Meter Batang 7,560.00
14 Engsel Jendela 3" Pasang 10,000.00
15 Engsel Pintu 4" Pasang 12,650.00
16 Grendel Jendela Buah 20,000.00
17 Grendel pintu Buah 25,000.00
18 Pegangan Jendela Buah 20,000.00
19 Kaca Bening Tebal 5 mm M2 57,500.00
20 Kait Angin Buah 10,000.00
21 Kawat Beton Kg 15,000.00
22 Kunci Tanam Kecil Buah 50,000.00
23 Kunci Silinder Buah 80,000.00
24 Kayu Klas I (Semantok/Damar Laut) M3 5,000,000.00
25 Kayu Klas II (Merantee/Kruing) M3 3,000,000.00
26 Kayu Klas III (Semaram/Borneo/dll) untuk Bekesting M3 2,500,000.00
27 Kayu Klas IV (Sengon/dll) untuk Bouwplank M3 2,000,000.00
28 Kayu Kaso M3 1,800,000.00
29 Keramik 60 x 60 cm Polished Buah 35,000.00
30 Keramik Unpolished 20 x 20 Cm Buah 2,400.00
31 Keramik 40 x 40 Cm Homogenius Polished Buah 8,000.00
32 Keramik 40 x 40 Cm Homogenius Unpolished Buah 9,000.00
33 Keramik 30 x 30 Cm Homogenius Polished Buah 5,130.00
34 Keramik 30 x 30 Cm Homogenius Unpolished Buah 5,220.00
NO. URAIAN SATUAN HARGA SATUAN (Rp.)

35 Ubin keramik 80 x 80 cm' Polished Buah 120,000.00


36 Ubin keramik 80 x 80 cm' unPolished Buah 110,000.00
37 Keramik dinding 30x30 Polished Buah 2,500.00
38 Keramik 25 x 25 Cm Buah 2,500.00
39 Keramik dinding 20 x 25 Cm Buah 3,050.00
40 Kerikil Beton/Bersih M3 240,000.00
41 Kerikil Beton/Bersih (1.350 Kg/M3) Kg 177.78
NO. URAIAN SATUAN HARGA SATUAN (Rp.)

42 Kertas Amplas Lembar 5,000.00


43 Kunci Pintu Buah 49,450.00
44 Lem Kayu Kg 25,000.00
45 List Profil Gypsum M' 20,000.00
46 Minyak Bekisting Liter 10,000.00
47 alumunium Strip m 25,000.00
48 Pintu Alumunium m 110,000.00
49 Profil Kaca m 60,000.00
50 Profil Alumunium m 100,000.00
51 Skrup Fixer Bh 1,000.00
52 Sealant Tube 20,000.00
53 Paku Kayu Biasa Kg 15,000.00
54 Paku ½" - 1" Kg 25,000.00
55 Paku Triplek Kg 14,000.00
56 Paku Skrup Bh 500.00
57 Paku Skrup Kg 20,000.00
58 Pasir Beton M3 130,000.00
59 Pasir Beton (1.400 Kg/M3) Kg 92.86
60 Pasir Pasang M3 110,000.00
61 Pasir Pasang (1.400 Kg/M3) Kg 78.57
62 Pasir Urug M3 100,000.00
63 Paving Block M2 150,000.00
64 Pemasangan Titik Lampu + Instalasi Titik 100,000.00
65 Pegangan Pintu Buah 100,000.00
66 Pegangan Jendela Buah 25,000.00
67 Plamir Kg 20,000.00
68 Plywood form 4 mm Lembar 71,000.00
69 Plywood form 9 mm Lembar 140,000.00
70 Profil C 75.75 Lembar 45,000.00
71 Semen Portland @ 40 Kg Zak 54,000.00
72 Semen Porland Kg 1,350.00
73 Semen Warna @ 50 Kg Zak 90,000.00
74 Semen Warna Kg 1,800.00
75 Seng Spandex Lembar 85,000.00
76 Seng Gelombang Bjls. 0,2 Lembar 85,000.00
77 Seng Plat Bjls. 0,2 Lembar 85,000.00
78 Tanah Timbun M3 60,000.00
79### Triplek 4 MM Lembar 150,000.00
80 Lampu HE 23 Watt setar Fhilip Buah 50,000.00
81 Lampu HE 18 Watt setar Fhilip Buah 30,000.00
82 Saklar dua ( Dauble) merek Barco Buah 15,000.00
83 Saklar tiga ( Dauble) merek Barco Buah 20,000.00
84 Stop Kontak Buah 15,000.00
85 Kloset Duduk Buah 2,500,000.00
86 Floor Drain Buah 20,000.00
NO. URAIAN SATUAN HARGA SATUAN (Rp.)

87 Pipa PVC 4" M 30,000.00


88 Pipa PVC 3" M 25,000.00
89 Pipa PVC 1/2" M 12,000.00
90 Washtafel Unit 1,500,000.00
91 Baja profil C 75.75 M' 20,000.00
92 Rabung Seng Genteng Metal M' 50,000.00
93 Hak Angin Buah 15,000.00
94 Reng U 0.5 M' 15,000.00
95 Baut Truss Buah 200.00
96 Baut Reng Buah 200.00
97 Tiner Liter 25,000.00
98 Kuas Buah 10,000.00
99 Baut Kg 25,000.00
100 Paku Seng Kg 25,000.00
REKAPITULASI
BLOCK C
Pekerjaan : Lanjutan Pembangunan RKB SMPN 1 Lhoksukon Kontruksi II Lantai Bangun Lantai I Block B dan Block C (Relokasi)
Lokasi : Kab. Aceh Utara (6 Ruang)
Lokasi : Kecamatan Lhoksukon Kabupaten Aceh Utara

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

III. PEMBANGUAN RUANG KELAS BLOCK C

A. PEKERJAAN BETON/BETON BERTULANG LANTAI II Rp. #REF!

B. PEKERJAAN PASANGAN DAN PLESTERAN Rp. 115,064,440.02

C. PEKERJAAN LANTAI Rp. #REF!

D. PEKERJAAN ATAP DAN PLAFOND Rp. #REF!

E. PEKERJAAN PINTU, JENDELA DAN KUNCI (LANTAI II) Rp. #REF!

F. PEKERJAAN LISTRIK (LANTAI I DAN II) Rp. #REF!

G. PEKERJAAN PENGECATAN (LANTAI I DAN LANTAI II) Rp. 50,457,936.23

(A) JUMLAH HARGA PEKERJAAN Rp. #REF!


(B) JUMLAH DIBULATKAN Rp. #REF!
Terbilang : Dua Milyar Sembilan Ratus Delapan Puluh Sembilan Juta Delapan Puluh Ribu Rupiah,-
BILL OF QUANTITY (BOQ)

Pekerjaan : Lanjutan Pembangunan RKB SMPN 1 Lhoksukon Kontruksi II Lantai Bangun Lantai I Block B dan Block C (Relokasi)
Lokasi : Kab. Aceh Utara (6 Ruang)
Lokasi : Kecamatan Lhoksukon Kabupaten Aceh Utara

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7=3x6

III. PEMBANGUAN RUANG KELAS BLOCK C


A. PEKERJAAN BETON/BETON BERTULANG
LANTAI II
15 Beton Bertulang Kolom Induk 30/40 cm 11.700 M³ #REF! #REF! #REF!
16 Beton Bertulang Kolom Teras 30/30 cm 3.380 M³ #REF! #REF! #REF!
17 Beton Bertulang Balok 25/30 cm 13.340 M³ #REF! #REF! #REF!
18 Beton Bertulang Balok Latai 13/15 cm 1.380 M³ #REF! #REF! #REF!
19 Beton Bertulang untuk selasar 13/15 cm (dudukan batu bata) 0.790 M³ #REF! #REF! #REF!
Sub Jumlah #REF!
B. PEKERJAAN PASANGAN DAN PLESTERAN
LANTAI II
1 Pasangan Dinding Bata 1 PC : 4 PS 311.715 M² A. 4.4.1.9 128,128.00 39,939,419.52
2 Plesteran Dinding Bata 1 PC : 4 PS 623.430 M² A. 4.4.2.4 74,787.90 46,625,020.50
6 Pemasangan Batu Kerawang 4.00 M² Taksir 250,000.00 1,000,000.00
7 Rellif Tiang Teras Sampai Lantai II (seperti Gambar) 10.00 Unit Taksir 500,000.00 5,000,000.00
8 Pemasangan Pagar Pengaman Teras (seperti Gambar) 1.00 Unit Taksir 8,000,000.00 8,000,000.00
9 Rellif Motif Tali Air (seperti Gambar) 1.00 ls Taksir 4,500,000.00 4,500,000.00
10 Pagar Pengaman Tangga Besi Galvanis 1.00 M' Taksir 5,500,000.00 5,500,000.00
11 Pintu Pengaman dari Teralis Untuk Tangga Lantai II ( Gambar) 1.00 Unit Taksir 4,500,000.00 4,500,000.00
Sub Jumlah 115,064,440.02
C. PEKERJAAN LANTAI
Pekerjaan Lantai Keramik
LANTAI I
1 Lantai Keramik 40 x 40 cm Anti Slip Pada Selasar 146.900 M² A.4.4.3.34a 216,348.00 31,781,521.20
2 Lantai Keramik 40 x 40 cm Anti Slip Pada Anak Tangga 28.000 M² A.4.4.3.34a 216,348.00 6,057,744.00
3 Bon-Bon Keramik 40.000 M¹ Taksir 10,000.00 400,000.00
LANTAI II
1 Lantai Keramik 40 x 40 cm Ruangan #REF! A.4.4.3.34a 216,348.00 #REF!
2 Lantai Keramik 40 x 40 cm Anti Slip Pada Selasar #REF! A.4.4.3.34a 216,348.00 #REF!
3 Bon-Bon Keramik #REF! Taksir 10,000.00 #REF!
Sub Jumlah #REF!
D. PEKERJAAN ATAP DAN PLAFOND
LANTAI I
1 Kayu Kanopi Kuda-kuda Terpasang 10.000 Bh Taksir 350,000.00 3,500,000.00
2 Memasang Gording Kayu 0.540 M³ A. 4.6.1.15 10,040,607.50 5,421,928.05
3 Memasang Atap Genteng Metal 66.600 M² A.4.5.2.32 83,506.50 5,561,532.90
4 Kayu Listplank Uk. 3/20 cm 42.000 M' A.4.6.1.21 66,676.50 2,800,413.00
5 Memasang Rangka Langit-langit (60 x 60) cm 303.919 M² A. 4.6.1.20 108,504.00 32,976,427.18
6 Memasang Langit-langit Tripleks t = 4 mm 366.149 M² A. 4.5.1.5 70,174.50 25,694,287.91
7 List Plafond 128.000 M¹ A. 4.5.1.9 37,559.50 4,807,616.00
LANTAI II
1 Rangka Kuda-Kuda dan Gording Zincalume Type 100, 565.250 M² Taksir 220,000.00 124,355,000.00
Penutup Atap dan Rabung Genteng Metal + Terpasang
2 Kayu Listplank Uk. 3/20 cm 107.960 M¹ A.4.6.1.21 66,676.50 7,198,394.94
3 Memasang Rangka Langit-langit (60 x 60) cm #REF! M² A. 4.6.1.20 108,504.00 #REF!
4 Memasang Langit-langit Tripleks t = 4 mm #REF! M² A. 4.5.1.5 70,174.50 #REF!
5 List Plafond #REF! M¹ A. 4.5.1.9 37,559.50 #REF!
6 Pemasangan Anti Petir, Lengkap, Siap Terpasang (Sesuai Gambar) 1.000 Ls Taksir 15,000,000.00 15,000,000.00
Sub Jumlah #REF!
E. PEKERJAAN PINTU, JENDELA DAN KUNCI (LANTAI II)
1 Pintu Type P1 (4 Unit)
a. Kosen Kayu 5/13 0.210 M³ A. 4.6.1.1 10,215,700.00 2,145,297.00
b. Daun Pintu Panel Ukuran 60 x 210 cm 8.000 unit Taksir 850,000.00 6,800,000.00
c. Ventilasi Ambang Ukuran 40 x 60 cm 8.000 unit Taksir 130,000.00 1,040,000.00
d. Kunci Tanam Bulat 4.000 buah Taksir 75,000.00 300,000.00
e. Pegangan Pintu 4.000 buah Taksir 75,000.00 300,000.00
f. Engsel Pintu 24.000 psg Taksir 12,650.00 303,600.00
g. Engsel Ventilasi 16.000 psg Taksir 10,000.00 160,000.00
h. Hak Angin Jendela / Ventilasi 8.000 psg Taksir 10,000.00 80,000.00
i. Grendel Ventilasi 4.000 buah Taksir 5,000.00 20,000.00
j. Tarikan Jendela 4.000 buah Taksir 5,000.00 20,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7=3x6

2 Jendela Ambang Kaca Type J1 (12 Unit)


a. Kosen Kayu 5/13 1.170 M³ A. 4.6.1.1 10,215,700.00 11,952,369.00
b. Daun Jendela Ukuran 60 x 85 cm 48.000 Unit Taksir 200,000.00 9,600,000.00
c. Ventilasi Ambang Ukuran 40 x 60 cm 48.000 Unit Taksir 90,000.00 4,320,000.00
d. Engsel Jendela 24.000 Psg Taksir 10,000.00 240,000.00
e. Engsel Ventilasi 24.000 Psg Taksir 10,000.00 240,000.00
f. Grendel Jendela / Ventilasi 48.000 Buah Taksir 5,000.00 240,000.00
g. Hak Angin Jendela / Ventilasi 24.000 Psg Taksir 10,000.00 240,000.00
h. Tarikan Jendela 48.000 Buah Taksir 5,000.00 240,000.00
3 Jendela Ambang Kaca Type J2 (4 Unit)
a. Kosen Kayu 5/13 0.300 M³ A. 4.6.1.1 10,215,700.00 3,064,710.00
b. Daun Jendela Ukuran 60 x 85 cm 12.000 Unit Taksir 200,000.00 2,400,000.00
c. Ventilasi Ambang Ukuran 40 x 60 cm 12.000 Unit Taksir 90,000.00 1,080,000.00
d. Engsel Jendela 12.000 Psg Taksir 10,000.00 120,000.00
e. Engsel Ventilasi 12.000 Psg Taksir 10,000.00 120,000.00
f. Grendel Jendela / Ventilasi 12.000 Buah Taksir #REF! #REF!
g. Hak Angin Jendela / Ventilasi 12.000 Psg Taksir 10,000.00 120,000.00
h. Tarikan Jendela 12.000 Buah Taksir 5,000.00 60,000.00
Sub Jumlah #REF!
F. PEKERJAAN LISTRIK (LANTAI I DAN II)
1 Armatur
- Lampu HE 18 Watt Setara Hannoch 36.000 Unit Taksir 25,000.00 900,000.00
2 Stop Kontak 9.000 Buah Taksir 15,000.00 135,000.00
3 Instalasi titik penerangan, instalasi termasuk kabel 36.000 Titik Taksir 90,000.00 3,240,000.00
NYA 3 x 2.5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang
4 Instalasi titik kontak, instalasi termasuk kabel 9.000 Titik Taksir 90,000.00 810,000.00
NYA 3 x 2.5 mm dalam pipa PVC, kotak stop kontak
BROCO dan kelengkapan instalasi terpasang
5 Saklar Lampu
- Saklar Tunggal (Single) Merk BROCO 1.000 Unit Taksir #REF! #REF!
- Saklar Dua Seri (Double) Merk BROCO 4.000 Unit Taksir 25,000.00 100,000.00
- Saklar Tiga Seri (Triple) Merk BROCO 1.000 Unit Taksir 37,500.00 37,500.00
Sub Jumlah #REF!
G. PEKERJAAN PENGECATAN (LANTAI I DAN LANTAI II)
1 Cat Tembok 3 x (L/D) 1,326.060 M² A. 4.7.1.10 22,592.90 29,959,540.97
2 Cat Tembok Pada Plat Lantai (Pengganti Plafond) 786.453 M² A. 4.7.1.10 22,592.90 17,768,253.98
3 Cat Kayu Lesplang dan Lis Plafond 53.889 M² A. 4.7.1.4 28,710.00 1,547,145.73
4 Cat Mengkilat Kosen, Daun Pintu, Jendela dan Jelusi 41.205 M² A. 4.7.1.4 28,710.00 1,182,995.55
Sub Jumlah 50,457,936.23
JADWAL WAKTU PELAKSANAAN PEKERJAAN (KURVA-S)
Pekerjaan : Pembangunan Asrama BLK
Lokasi : Kabupaten Simeulue
Tahun Anggaran : 2017
Bobot Masa Pelaksanaan (150 Hari)
Jumlah Harga
No. Uraian Kegiatan Volume Sat Rencana Bulan I Bulan II Bulan III Bulan IV Bulan V Ket (%)
(Rp)
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A. #REF!
I. PEKERJAAN PERSIAPAN
1 Mobilisasi 5.00 - 15,000,000.00 #REF! #REF! 1
100%
2 Pengukuran 40.00 - 600,000,000.00 #REF! #REF! 1
3 Bangunan Direksi Keet dan Barak Kerja 180.00 - 180,000,000.00 #REF! #REF! 2
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
B. Pekerjaan Cerucuk Bambu T=1 m' ( terpancang )
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
90%
5 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF! #REF!
C. #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF! #REF!
D. #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! 80%
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF!
E. #REF!
#REF!
1 #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
1 #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! 70%
4 #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF!
F. #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF! #REF!
60%
G. #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! 50%
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
50%

#REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! 40%

#REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! 30%

#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
20%
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
H. #REF!
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! 10%
3 #REF! #REF! #REF! #REF! #REF! #REF!
I. #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
J. #REF!
0%
1 #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL BOBOT (%) #REF! #REF!
PROGRESS RENCANA MINGGUAN (%) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PROGRESS RENCANA KUMULATIF MINGGUAN (%) 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
ANALISA TEKNIS
PEKERJAAN : PEMBANGUNAN RUMAH BIDAN DAN PENATAAN HALAMAN PUSKESMAS SANGGIRAN (OTSUS)
LOKASI : KABUPATEN SIMEULUE
TAHUN ANGGARAN : 2017

A. PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan
Volume pekerjaan = 1.00 Pkt
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Mandor 1.0000 OH
3. Juru Ukur 1.0000 OH
Jumlah 3.0000 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.33 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.33 = 1.00 Pkt
Waktu dibutuhkan = 1.00 : 1.00 = 1.00 Hari = 1.00 Hari
Dibulatkan = 1.00 Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

2. Mobilisasi Dan Demobilisasi


Volume pekerjaan = 1.00 Pkt Selama masa pelaksanaan 180 hari kerja
Tenaga kerja yang digunakan = Man Power
1. Tenaga Adm 1.0000 OH
Jumlah 1.0000 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 1.00 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 1.00 = 1.00 Pkt
Waktu dibutuhkan = 180.00 : 1.00 = 180.00 Hari = 180.00 Hari
Dibulatkan = 24.00 Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

3. Pengukuran dan Pemasangan Bowplank


Volume pekerjaan = 1.00 Pkt
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Mandor 1.0000 OH
3. Tukang 1.0000 OH
Jumlah 3.0000 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.33 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.33 = 1.00 Pkt
Waktu dibutuhkan = 1.00 : 1.00 = 1.00 Hari = 1.00 Hari
Dibulatkan = 1.00 Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

4. Pemasangan Papan Proyek


Volume pekerjaan = 1.00 Pkt Selama masa kebutuhan ditaksir 28 hari kerja
Tenaga kerja yang digunakan = Man Power
1. Pelaksana Lapangan 1.0000 OH
Jumlah 1.0000 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 1.00 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 1.00 = 1.00 Pkt
Waktu dibutuhkan = 28.00 : 1.00 = 28.00 Hari = 28.00 Hari
Dibulatkan = 4.00 Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

5. Administrasi Dan Dokumentasi


Volume pekerjaan = 1.00 Pkt
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Mandor 1.0000 OH
3. Tukang 1.0000 OH
Jumlah 3.0000 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.33 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.33 = 1.00 Pkt
Waktu dibutuhkan = 1.00 : 1.00 = 1.00 Hari = 1.00 Hari
Dibulatkan = 1.00 Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

B. PEKERJAAN TANAH DAN PONDASI


###
1. Galian Tanah Pondasi menerus Bangunan
Volume pekerjaan = 84.60 M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Mandor 0.0320 OH
Jumlah 1.0320 OH
Jumlah tenaga dipekerjakan = 18.00 OH
Kapasitas produksi per hari = 0.97 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 18.00 x 0.97 = 17.44 M3
Waktu dibutuhkan = 84.60 : 17.44 = 4.85 Hari = 5.00 Hari
Dibulatkan = 1.00 Minggu
Jumlah Pemakaian Bahan = Tidak Ada Bahan
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.5000 OH
2. Mandor 0.0500 OH
Jumlah 0.5500 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 1.82 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 1.82 = 7.27 M3
Waktu dibutuhkan = #REF! : 7.27 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Tidak Ada Bahan
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Mandor 0.0100 OH
Jumlah 0.3100 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 3.23 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 3.23 = 3.23 M3
Waktu dibutuhkan = #REF! : 3.23 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Pasir Urug = 1.200 X #REF! = #REF! M3
Jumlah Pemakaian Alat = Perlengkapan Kerja

4. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 6.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 6.00 x 0.49 = 2.95 M3
Waktu dibutuhkan = #REF! : 2.95 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 276.00 X #REF! = #REF! kg
2. Pasir Beton = 828.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1012.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

5. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 1.9250 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.52 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.52 = 1.56 M3
Waktu dibutuhkan = #REF! : 1.56 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.30 X #REF! = #REF! kg
11. Minyak Bekesting = 0.10 X #REF! = #REF! liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

6. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 3.4000 OH
2. Tukang batu 0.8500 OH
3. Kepala Tukang 0.0850 OH
4. Mandor 0.1700 OH
Jumlah 4.5050 OH
Jumlah tenaga dipekerjakan = 9.00 OH
Kapasitas produksi per hari = 0.22 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 9.00 x 0.22 = 2.00 M3
Waktu dibutuhkan = #REF! : 2.00 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Batu Belah/ Kali = 0.48 X #REF! = #REF! m3
2. Semen Portland = 194.00 X #REF! = #REF! kg
3. Pasir Beton = 0.31 X #REF! = #REF! m3
4. Kerikil = 0.47 X #REF! = #REF! m3
5. Besi Beton Polos = 126.00 X #REF! = #REF! kg
6. Kawat Beton = 1.80 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

7. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 0.49 = 1.96 M3
Waktu dibutuhkan = #REF! : 1.96 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 384.00 X #REF! = #REF! kg
2. Pasir Beton = 692.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1039.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

8. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 1.9250 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 0.52 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 0.52 = 2.08 M3
Waktu dibutuhkan = #REF! : 2.08 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Kayu Klas III = 0.04 X #REF! = #REF! m3
8. Paku 5 - 10 cm = 0.30 X #REF! = #REF! kg
9. Minyak Bekesting = 0.10 X #REF! = #REF! liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

9. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 1.9250 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 0.52 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 0.52 = 2.08 M3
Waktu dibutuhkan = #REF! : 2.08 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Kayu Klas III = 0.04 X #REF! = #REF! m3
8. Paku 5 - 10 cm = 0.30 X #REF! = #REF! kg
9. Minyak Bekesting = 0.10 X #REF! = #REF! liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

10. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 1.9250 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 0.52 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 0.52 = 2.08 M3
Waktu dibutuhkan = #REF! : 2.08 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

11. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 1.9250 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 0.52 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 0.52 = 2.08 M3
Waktu dibutuhkan = #REF! : 2.08 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

12. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 1.9250 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 0.52 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 0.52 = 2.08 M3
Waktu dibutuhkan = #REF! : 2.08 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.05 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.30 X #REF! = #REF! kg
11. Minyak Bekesting = 0.10 X #REF! = #REF! liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

13. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 1.9250 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 0.52 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 0.52 = 2.08 M3
Waktu dibutuhkan = #REF! : 2.08 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.05 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.30 X #REF! = #REF! kg
11. Minyak Bekesting = 0.10 X #REF! = #REF! liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

###
1. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Mandor 0.0320 OH
Jumlah 1.0320 OH
Jumlah tenaga dipekerjakan = 12.00 OH
Kapasitas produksi per hari = 0.97 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 12.00 x 0.97 = 11.63 M3
Waktu dibutuhkan = #REF! : 11.63 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Tidak Ada Bahan
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.5000 OH
2. Mandor 0.0500 OH
Jumlah 0.5500 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 1.82 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 1.82 = 7.27 M3
Waktu dibutuhkan = #REF! : 7.27 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Tidak Ada Bahan
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Mandor 0.0100 OH
Jumlah 0.3100 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 3.23 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 3.23 = 3.23 M3
Waktu dibutuhkan = #REF! : 3.23 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Pekerja = 1.650 X #REF! = #REF! M3
Jumlah Pemakaian Alat = Perlengkapan Kerja
4. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.7800 OH
2. Tukang batu 0.3900 OH
3. Kepala Tukang 0.0390 OH
4. Mandor 0.0390 OH
Jumlah 1.2480 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.80 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.80 = 2.40 M3
Waktu dibutuhkan = #REF! : 2.40 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Batu Belah/ Kali = 1.200 X #REF! = #REF! m3
2. Pasir Urug = 0.432 X #REF! = #REF! m3
Jumlah Pemakaian Alat = Perlengkapan Kerja

5. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.5000 OH
2. Tukang batu 0.7500 OH
3. Kepala Tukang 0.0750 OH
4. Mandor 0.0750 OH
Jumlah 2.4000 OH
Jumlah tenaga dipekerjakan = 9.00 OH
Kapasitas produksi per hari = 0.42 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 9.00 x 0.42 = 3.75 M3
Waktu dibutuhkan = #REF! : 3.75 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Batu Belah/ Kali = 1.200 X #REF! = #REF! m3
2. Semen Portland = 163.000 X #REF! = #REF! Kg
3. Pasir Pasang = 0.520 X #REF! = #REF! m3
Jumlah Pemakaian Alat = Perlengkapan Kerja

###
1. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Mandor 0.0320 OH
Jumlah 1.0320 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.97 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.97 = 2.91 M3
Waktu dibutuhkan = #REF! : 2.91 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Tidak Ada Bahan
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.5000 OH
2. Mandor 0.0500 OH
Jumlah 0.5500 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 1.82 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 1.82 = 3.64 M3
Waktu dibutuhkan = #REF! : 3.64 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Tidak Ada Bahan
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Mandor 0.0100 OH
Jumlah 0.3100 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 3.23 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 3.23 = 3.23 M3
Waktu dibutuhkan = #REF! : 3.23 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Pasir Urug = 1.200 X #REF! = #REF! M3
Jumlah Pemakaian Alat = Perlengkapan Kerja

4. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 0.49 = 0.98 M3
Waktu dibutuhkan = #REF! : 0.98 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 276.00 X #REF! = #REF! kg
2. Pasir Beton = 828.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1012.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

5. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Tukang batu 0.1000 OH
3. Kepala Tukang 0.0100 OH
4. Mandor 0.0150 OH
Jumlah 0.4250 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.35 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.35 = 4.71 M2
Waktu dibutuhkan = #REF! : 4.71 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Bata Merah = 70.00 X #REF! = #REF! bh
2. Semen Portland = 18.95 X #REF! = #REF! kg
3. Pasir Pasang = 0.04 X #REF! = #REF! m3
Jumlah Pemakaian Alat = Perlengkapan Kerja
6. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Tukang batu 0.1500 OH
3. Kepala Tukang 0.0150 OH
4. Mandor 0.0150 OH
Jumlah 0.4800 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 2.08 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 2.08 = 8.33 M2
Waktu dibutuhkan = #REF! : 8.33 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 10.22 X #REF! = #REF! kg
2. Pasir Pasang = 0.02 X #REF! = #REF! m3
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
#REF! ###
###
1. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 0.49 = 1.96 M3
Waktu dibutuhkan = #REF! : 1.96 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
Jumlah Pemakaian Alat = Perlengkapan Kerja
3. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

4. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

5. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

6. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

7. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

8. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

9. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

10. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Polos = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Kayu Klas III = 0.04 X #REF! = #REF! m3
8. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
9. Minyak Bekesting = 0.20 X #REF! = #REF! liter
10. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
11. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
12. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

11. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Polos = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Kayu Klas III = 0.04 X #REF! = #REF! m3
8. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
9. Minyak Bekesting = 0.20 X #REF! = #REF! liter
10. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
11. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
12. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

12. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Polos = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Kayu Klas III = 0.04 X #REF! = #REF! m3
8. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
9. Minyak Bekesting = 0.20 X #REF! = #REF! liter
10. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
11. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
12. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

13. ###
Volume pekerjaan = #REF! #REF!
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0700 OH
2. Tukang besi 0.0700 OH
3. Kepala Tukang 0.0070 OH
4. Mandor 0.0040 OH
Jumlah 0.1510 OH
Jumlah tenaga dipekerjakan = 15.00 OH
Kapasitas produksi per hari = 6.62 Kg/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 15.00 x 6.62 = 99.34 #REF!
Waktu dibutuhkan = #REF! : 99.34 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
2. Kawat Beton = 0.15 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja
14. ###
Volume pekerjaan = #REF! #REF!
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0700 OH
2. Tukang besi 0.0700 OH
3. Kepala Tukang 0.0070 OH
4. Mandor 0.0040 OH
Jumlah 0.1510 OH
Jumlah tenaga dipekerjakan = 6.00 OH
Kapasitas produksi per hari = 6.62 Kg/Orang/Hari( 7 Jam / Hari Kerja)
Produksi per hari = 6.00 x 6.62 = 39.74 #REF!
Waktu dibutuhkan = #REF! : 39.74 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
2. Kawat Beton = 0.15 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

###
1. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang besi 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Polos = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Kayu Klas III = 0.04 X #REF! = #REF! m3
8. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
9. Minyak Bekesting = 0.20 X #REF! = #REF! liter
10. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
11. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
12. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Polos = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Kayu Klas III = 0.04 X #REF! = #REF! m3
8. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
9. Minyak Bekesting = 0.20 X #REF! = #REF! liter
10. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
11. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
12. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
1. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Tukang batu 0.1000 OH
3. Kepala Tukang 0.0100 OH
4. Mandor 0.0150 OH
Jumlah 0.4250 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 2.35 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 2.35 = 7.06 M2
Waktu dibutuhkan = #REF! : 7.06 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Bata Merah = 70.00 X #REF! = #REF! bh
2. Semen Portland = 18.95 X #REF! = #REF! kg
3. Pasir Pasang = 0.04 X #REF! = #REF! m3
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Tukang batu 0.1000 OH
3. Kepala Tukang 0.0100 OH
4. Mandor 0.0150 OH
Jumlah 0.4250 OH
Jumlah tenaga dipekerjakan = 8.00 OH
Kapasitas produksi per hari = 2.35 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 8.00 x 2.35 = 18.82 M2
Waktu dibutuhkan = #REF! : 18.82 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Bata Merah = 70.00 X #REF! = #REF! bh
2. Semen Portland = 11.50 X #REF! = #REF! kg
3. Pasir Pasang = 0.04 X #REF! = #REF! m3
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Tukang batu 0.1500 OH
3. Kepala Tukang 0.0150 OH
4. Mandor 0.0150 OH
Jumlah 0.4800 OH
Jumlah tenaga dipekerjakan = 6.00 OH
Kapasitas produksi per hari = 2.08 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 6.00 x 2.08 = 12.50 M2
Waktu dibutuhkan = #REF! : 12.50 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 10.22 X #REF! = #REF! kg
2. Pasir Pasang = 0.02 X #REF! = #REF! m3
Jumlah Pemakaian Alat = Perlengkapan Kerja

4. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Tukang batu 0.1500 OH
3. Kepala Tukang 0.0150 OH
4. Mandor 0.0150 OH
Jumlah 0.4800 OH
Jumlah tenaga dipekerjakan = 18.00 OH
Kapasitas produksi per hari = 2.08 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 18.00 x 2.08 = 37.50 M2
Waktu dibutuhkan = #REF! : 37.50 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 6.24 X #REF! = #REF! kg
2. Pasir Pasang = 0.02 X #REF! = #REF! m3
Jumlah Pemakaian Alat = Perlengkapan Kerja
#REF! ###
1. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.2500 OH
2. Mandor 0.0250 OH
Jumlah 0.2750 OH
Jumlah tenaga dipekerjakan = 6.00 OH
Kapasitas produksi per hari = 3.64 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 6.00 x 3.64 = 21.82 M3
Waktu dibutuhkan = #REF! : 21.82 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Tanah Timbun = 1.20 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Mandor 0.0100 OH
Jumlah 0.3100 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 3.23 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 3.23 = 6.45 M3
Waktu dibutuhkan = #REF! : 6.45 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Pasir Urug = 1.20 X #REF! = #REF! OH
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 5.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 5.00 x 0.49 = 2.46 M3
Waktu dibutuhkan = #REF! : 2.46 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 276.00 X #REF! = #REF! kg
2. Pasir Beton = 828.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1012.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

4. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.6200 OH
2. Tukang batu 0.3500 OH
3. Kepala Tukang 0.0350 OH
4. Mandor 0.0300 OH
Jumlah 1.0350 OH
Jumlah tenaga dipekerjakan = 15.00 OH
Kapasitas produksi per hari = 0.97 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 15.00 x 0.97 = 14.49 M2
Waktu dibutuhkan = #REF! : 14.49 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Keramik = 6.56 X #REF! = #REF! Bh
2. Semen Portland = 10.00 X #REF! = #REF! kg
3. Pasir Pasang = 0.05 X #REF! = #REF! m3
4. Semen Warna = 1.50 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

5. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.6200 OH
2. Tukang batu 0.3500 OH
3. Kepala Tukang 0.0350 OH
4. Mandor 0.0300 OH
Jumlah 1.0350 OH
Jumlah tenaga dipekerjakan = 10.00 OH
Kapasitas produksi per hari = 0.97 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 10.00 x 0.97 = 9.66 M2
Waktu dibutuhkan = #REF! : 9.66 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Keramik = 6.56 X #REF! = #REF! Bh
2. Semen Portland = 10.00 X #REF! = #REF! kg
3. Pasir Pasang = 0.05 X #REF! = #REF! m3
4. Semen Warna = 1.50 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

6. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.6200 OH
2. Tukang batu 0.3500 OH
3. Kepala Tukang 0.0350 OH
4. Mandor 0.0300 OH
Jumlah 1.0350 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 0.97 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 0.97 = 3.86 M2
Waktu dibutuhkan = #REF! : 3.86 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Keramik = 6.56 X #REF! = #REF! Bh
2. Semen Portland = 10.00 X #REF! = #REF! kg
3. Pasir Pasang = 0.05 X #REF! = #REF! m3
4. Semen Warna = 1.50 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

7. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.6200 OH
2. Tukang batu 0.3500 OH
3. Kepala Tukang 0.0350 OH
4. Mandor 0.0300 OH
Jumlah 1.0350 OH
Jumlah tenaga dipekerjakan = 7.00 OH
Kapasitas produksi per hari = 0.97 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 7.00 x 0.97 = 6.76 M'
Waktu dibutuhkan = #REF! : 6.76 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Step Nozing = 1.00 X #REF! = #REF! M'
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
1. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 7.00 OH
2. Tukang Kayu 21.00 OH
3. Kepala Tukang 2.10 OH
4. Mandor 0.35 OH
Jumlah 30.45 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 0.03 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 0.03 = 0.07 M3
Waktu dibutuhkan = #REF! : 0.07 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Kayu Kelas I = 1.10 X #REF! = #REF! m3
2. Paku = 1.25 X #REF! = #REF! kg
3. Lem Kayu = 1.00 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Tukang Kayu 1.0000 OH
Jumlah 2.00 OH
Jumlah tenaga dipekerjakan = 18.00 OH
Kapasitas produksi per hari = 0.50 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 18.00 x 0.50 = 9.00 M'
Waktu dibutuhkan = #REF! : 9.00 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

3. ###
Volume pekerjaan = #REF! Unit
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Tukang Kayu 1.0000 OH
Jumlah 2.00 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.50 Unit/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.50 = 1.50 Unit
Waktu dibutuhkan = #REF! : 1.50 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

4. ###
Volume pekerjaan = #REF! Unit
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Tukang Kayu 1.0000 OH
Jumlah 2.00 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.50 Unit/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.50 = 1.50 Unit
Waktu dibutuhkan = #REF! : 1.50 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

5. ###
Volume pekerjaan = #REF! Unit
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Tukang Kayu 1.0000 OH
Jumlah 2.00 OH
Jumlah tenaga dipekerjakan = 5.00 OH
Kapasitas produksi per hari = 0.50 Unit/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 5.00 x 0.50 = 2.50 Unit
Waktu dibutuhkan = #REF! : 2.50 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

6. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0150 OH
2. Tukang Kayu 0.1500 OH
3. Kepala Tukang 0.0150 OH
4. Mandor 0.0008 OH
Jumlah 0.1808 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 5.53 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 5.53 = 5.53 M2
Waktu dibutuhkan = #REF! : 5.53 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Kaca Tebal 5 mm = 1.100 X #REF! = #REF! m2
2. Sealant = 0.050 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
1. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 4.0000 OH
2. Tukang Kayu 12.000 OH
3. Kepala Tukang 1.2000 OH
4. Mandor 0.2000 OH
Jumlah 17.400 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 0.06 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 0.06 = 0.11 M3
Waktu dibutuhkan = #REF! : 0.11 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Balok Kayu = 1.100 X #REF! = #REF! m3
2. Besi Strip tebal 5 m = 15.000 X #REF! = #REF! kg
3. Paku 12 cm = 5.600 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 6.7000 OH
2. Tukang Kayu 20.100 OH
3. Kepala Tukang 2.0100 OH
4. Mandor 0.3350 OH
Jumlah 29.145 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 0.03 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 0.03 = 0.07 M3
Waktu dibutuhkan = #REF! : 0.07 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Balok Kayu = 1.100 X #REF! = #REF! m3
2. Besi Strip tebal 5 m = 15.000 X #REF! = #REF! kg
3. Paku 12 cm = 3.000 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.2000 OH
2. Tukang Kayu 0.1000 OH
3. Kepala Tukang 0.0100 OH
4. Mandor 0.0100 OH
Jumlah 0.320 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 3.13 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 3.13 = 6.25 M2
Waktu dibutuhkan = #REF! : 6.25 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Seng Spandex = 1.020 X #REF! = #REF! Lbr
2. Paku Skrup = 0.200 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

4. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.2500 OH
2. Tukang Kayu 0.1500 OH
3. Kepala Tukang 0.0150 OH
4. Mandor 0.0130 OH
Jumlah 0.428 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.34 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.34 = 4.67 M'
Waktu dibutuhkan = #REF! : 4.67 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Profil C 75.75 = 1.000 X #REF! = #REF! Lbr
2. Baut Reng = 11.000 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

5. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.1000 OH
2. Tukang Kayu 0.2000 OH
3. Kepala Tukang 0.0200 OH
4. Mandor 0.0050 OH
Jumlah 0.325 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 3.08 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 3.08 = 9.23 M'
Waktu dibutuhkan = #REF! : 9.23 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Papan Kayu klas II = 0.011 X #REF! = #REF! m3
2. Paku = 0.100 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
1. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.1000 OH
2. Tukang Kayu 0.2000 OH
3. Kepala Tukang 0.0200 OH
4. Mandor 0.0050 OH
Jumlah 0.325 OH
Jumlah tenaga dipekerjakan = 6.00 OH
Kapasitas produksi per hari = 3.08 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 6.00 x 3.08 = 18.46 M2
Waktu dibutuhkan = #REF! : 18.46 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Papan Kayu klas II = 0.011 X #REF! = #REF! m3
2. Paku = 0.100 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.1000 OH
2. Tukang Kayu 0.1000 OH
3. Kepala Tukang 0.0100 OH
4. Mandor 0.0050 OH
Jumlah 0.215 OH
Jumlah tenaga dipekerjakan = 7.00 OH
Kapasitas produksi per hari = 4.65 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 7.00 x 4.65 = 32.56 M2
Waktu dibutuhkan = #REF! : 32.56 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Triplex = 0.250 X #REF! = #REF! Lbr
2. Paku Triplex = 0.030 X #REF! = #REF! Kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0500 OH
2. Tukang Kayu 0.0500 OH
3. Kepala Tukang 0.0050 OH
4. Mandor 0.0030 OH
Jumlah 0.108 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 9.26 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 9.26 = 27.78 M'
Waktu dibutuhkan = #REF! : 27.78 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. List Gysum Profil = 1.050 X #REF! = #REF! m'
2. Paku = 0.010 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
###
###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 1.0000 OH
2. Pekerja 1.0000 OH
Jumlah 2.0000 OH
Jumlah tenaga dipekerjakan = 7.00 OH
Kapasitas produksi per hari = 0.50 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 7.00 x 0.50 = 3.50 Bh
Waktu dibutuhkan = #REF! : 3.50 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 1.0000 OH
2. Pekerja 1.0000 OH
Jumlah 2.0000 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.50 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.50 = 1.50 Bh
Waktu dibutuhkan = #REF! : 1.50 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

2. ###
Volume pekerjaan = #REF! Ttk
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.5000 OH
2. Pekerja 0.0500 OH
Jumlah 0.5500 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 1.82 Ttk/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 1.82 = 5.45 Ttk
Waktu dibutuhkan = #REF! : 5.45 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

3. ###
Volume pekerjaan = #REF! Ttk
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.5000 OH
2. Pekerja 0.0500 OH
Jumlah 0.5500 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 1.82 Ttk/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 1.82 = 3.64 Ttk
Waktu dibutuhkan = #REF! : 3.64 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

###
###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.3200 OH
2. Pekerja 0.0300 OH
Jumlah 0.3500 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.86 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.86 = 5.71 Bh
Waktu dibutuhkan = #REF! : 5.71 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.3200 OH
2. Pekerja 0.0300 OH
Jumlah 0.3500 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.86 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.86 = 5.71 Bh
Waktu dibutuhkan = #REF! : 5.71 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.3200 OH
2. Pekerja 0.0300 OH
Jumlah 0.3500 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.86 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.86 = 5.71 Bh
Waktu dibutuhkan = #REF! : 5.71 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

5. ###
Volume pekerjaan = #REF! Unit
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.3200 OH
2. Pekerja 0.0300 OH
Jumlah 0.3500 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.86 Unit/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.86 = 5.71 Unit
Waktu dibutuhkan = #REF! : 5.71 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

6. ###
Volume pekerjaan = #REF! Pkt
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.3200 OH
2. Pekerja 0.0300 OH
Jumlah 0.3500 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.86 Pkt/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.86 = 5.71 Pkt
Waktu dibutuhkan = #REF! : 5.71 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

#REF! ###
1. ###
Volume pekerjaan = #REF! Pkt
Tenaga kerja yang digunakan = Man Power
1. Tukang Pipa 1.0000 OH
2. Pekerja 1.0000 OH
Jumlah 2.0000 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 0.50 Pkt/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 0.50 = 1.00 Pkt
Waktu dibutuhkan = #REF! : 1.00 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

2. ###
Volume pekerjaan = #REF! Unit
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.2000 OH
2. Tukang 1.4500 OH
3. Kepala Tukang 0.1500 OH
4. Mandor 0.0600 OH
Jumlah 2.8600 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.35 Unit/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.35 = 1.05 Unit
Waktu dibutuhkan = #REF! : 1.05 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Washtafel = 1.200 X #REF! = #REF! Unit
2. Sement Portland = 6.000 X #REF! = #REF! Kg
3. Pasir Pasang = 0.010 X #REF! = #REF! M3
4. Perlengkapan = 0.120 X #REF! = #REF! Ls
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
1. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0700 OH
2. Tukang 0.0090 OH
3. Kepala Tukang 0.0060 OH
4. Mandor 0.0030 OH
Jumlah 0.0880 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 11.36 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 11.36 = 22.73 M2
Waktu dibutuhkan = #REF! : 22.73 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Cat Menie = 0.200 X #REF! = #REF! kg
2. Plamir = 0.150 X #REF! = #REF! kg
3. Cat Dasar = 0.170 X #REF! = #REF! kg
4. Cat Penutup = 0.260 X #REF! = #REF! kg
5. #REF! = #REF! X #REF! = #REF! ###
6. #REF! = #REF! X #REF! = #REF! ###
7. #REF! = #REF! X #REF! = #REF! ###
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0200 OH
2. Tukang Cat 0.0630 OH
3. Kepala Tukang 0.0063 OH
4. Mandor 0.0030 OH
Jumlah 0.0923 OH
Jumlah tenaga dipekerjakan = 6.00 OH
Kapasitas produksi per hari = 10.83 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 6.00 x 10.83 = 65.01 M2
Waktu dibutuhkan = #REF! : 65.01 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Plamur = 0.100 X #REF! = #REF! kg
2. Cat Dasar = 0.100 X #REF! = #REF! kg
3. Cat Penutup = 0.260 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0200 OH
2. Tukang Cat 0.0630 OH
3. Kepala Tukang 0.0063 OH
4. Mandor 0.0030 OH
Jumlah 0.0923 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 10.83 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 10.83 = 43.34 M2
Waktu dibutuhkan = #REF! : 43.34 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Plamur = 0.100 X #REF! = #REF! kg
2. Cat Dasar = 0.100 X #REF! = #REF! kg
3. Cat Penutup = 0.260 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

4. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0700 OH
2. Tukang Cat 0.0090 OH
3. Kepala Tukang 0.0060 OH
4. Mandor 0.0030 OH
Jumlah 0.0880 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 11.36 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 11.36 = 22.73 M2
Waktu dibutuhkan = #REF! : 22.73 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Cat Menie = 0.200 X #REF! = #REF! kg
2. Plamir = 0.150 X #REF! = #REF! kg
3. Cat Dasar = 0.170 X #REF! = #REF! kg
4. Cat Penutup = 0.260 X #REF! = #REF! kg
5. #REF! = #REF! X #REF! = #REF! ###
6. #REF! = #REF! X #REF! = #REF! ###
7. #REF! = #REF! X #REF! = #REF! ###
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
#REF! ###
###
1. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 0.49 = 1.96 M3
Waktu dibutuhkan = #REF! : 1.96 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang Kayu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

4. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

5. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Ulir = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Besi Beton Polos = 10.50 X #REF! = #REF! kg
8. Kawat Beton = 0.15 X #REF! = #REF! kg
9. Kayu Klas III = 0.04 X #REF! = #REF! m3
10. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
11. Minyak Bekesting = 0.20 X #REF! = #REF! liter
12. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
13. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
14. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

6. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.6500 OH
2. Tukang batu 0.2750 OH
3. Kepala Tukang 0.0280 OH
4. Mandor 0.0830 OH
Jumlah 2.0360 OH
Jumlah tenaga dipekerjakan = 3.00 OH
Kapasitas produksi per hari = 0.49 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 3.00 x 0.49 = 1.47 M3
Waktu dibutuhkan = #REF! : 1.47 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 371.00 X #REF! = #REF! kg
2. Pasir Beton = 698.00 X #REF! = #REF! kg
3. Kerikil (Maks 30 mm = 1047.00 X #REF! = #REF! kg
4. Air = 215.00 X #REF! = #REF! Liter
5. Besi Beton Polos = 10.50 X #REF! = #REF! kg
6. Kawat Beton = 0.15 X #REF! = #REF! kg
7. Kayu Klas III = 0.04 X #REF! = #REF! m3
8. Paku 5 - 10 cm = 0.40 X #REF! = #REF! kg
9. Minyak Bekesting = 0.20 X #REF! = #REF! liter
10. Balok Kayu Klas II = 0.02 X #REF! = #REF! m3
11. Plywood tebal 9 m = 0.35 X #REF! = #REF! Lbr
12. Dolken kayu ᴓ 8 - 1 = 2.00 X #REF! = #REF! Batang
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
1. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Tukang batu 0.1000 OH
3. Kepala Tukang 0.0100 OH
4. Mandor 0.0150 OH
Jumlah 0.4250 OH
Jumlah tenaga dipekerjakan = 10.00 OH
Kapasitas produksi per hari = 2.35 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 10.00 x 2.35 = 23.53 M2
Waktu dibutuhkan = #REF! : 23.53 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Bata Merah = 70.00 X #REF! = #REF! bh
2. Semen Portland = 11.50 X #REF! = #REF! kg
3. Pasir Pasang = 0.04 X #REF! = #REF! m3
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.3000 OH
2. Tukang batu 0.1500 OH
3. Kepala Tukang 0.0150 OH
4. Mandor 0.0150 OH
Jumlah 0.4800 OH
Jumlah tenaga dipekerjakan = 20.00 OH
Kapasitas produksi per hari = 2.08 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 20.00 x 2.08 = 41.67 M2
Waktu dibutuhkan = #REF! : 41.67 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Semen Portland = 6.24 X #REF! = #REF! kg
2. Pasir Pasang = 0.02 X #REF! = #REF! m3
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
1. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.6200 OH
2. Tukang batu 0.3500 OH
3. Kepala Tukang 0.0350 OH
4. Mandor 0.0300 OH
Jumlah 1.0350 OH
Jumlah tenaga dipekerjakan = 14.00 OH
Kapasitas produksi per hari = 0.97 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 14.00 x 0.97 = 13.53 M2
Waktu dibutuhkan = #REF! : 13.53 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Keramik = 6.56 X #REF! = #REF! Bh
2. Semen Portland = 10.00 X #REF! = #REF! kg
3. Pasir Pasang = 0.05 X #REF! = #REF! m3
4. Semen Warna = 1.50 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.6200 OH
2. Tukang batu 0.3500 OH
3. Kepala Tukang 0.0350 OH
4. Mandor 0.0300 OH
Jumlah 1.0350 OH
Jumlah tenaga dipekerjakan = 8.00 OH
Kapasitas produksi per hari = 0.97 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 8.00 x 0.97 = 7.73 M2
Waktu dibutuhkan = #REF! : 7.73 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Keramik = 6.56 X #REF! = #REF! Bh
2. Semen Portland = 10.00 X #REF! = #REF! kg
3. Pasir Pasang = 0.05 X #REF! = #REF! m3
4. Semen Warna = 1.50 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.6200 OH
2. Tukang batu 0.3500 OH
3. Kepala Tukang 0.0350 OH
4. Mandor 0.0300 OH
Jumlah 1.0350 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 0.97 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 0.97 = 1.93 M2
Waktu dibutuhkan = #REF! : 1.93 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Keramik = 6.56 X #REF! = #REF! Bh
2. Semen Portland = 10.00 X #REF! = #REF! kg
3. Pasir Pasang = 0.05 X #REF! = #REF! m3
4. Semen Warna = 1.50 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

4. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Tukang 1.0000 OH
Jumlah 2.0000 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 0.50 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 0.50 = 1.00 M2
Waktu dibutuhkan = #REF! : 1.00 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

#REF! ###
1. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Pekerja 7.00 OH
2. Tukang Kayu 21.00 OH
3. Kepala Tukang 2.10 OH
4. Mandor 0.35 OH
Jumlah 30.45 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 0.03 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 0.03 = 0.07 M3
Waktu dibutuhkan = #REF! : 0.07 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Kayu Kelas I = 1.10 X #REF! = #REF! m3
2. Paku = 1.25 X #REF! = #REF! kg
3. Lem Kayu = 1.00 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Tukang Kayu 1.0000 OH
Jumlah 2.00 OH
Jumlah tenaga dipekerjakan = 18.00 OH
Kapasitas produksi per hari = 0.50 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 18.00 x 0.50 = 9.00 M'
Waktu dibutuhkan = #REF! : 9.00 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

3. ###
Volume pekerjaan = #REF! Unit
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Tukang Kayu 1.0000 OH
Jumlah 2.00 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 0.50 Unit/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 0.50 = 1.00 Unit
Waktu dibutuhkan = #REF! : 1.00 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

5. ###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Pekerja 1.0000 OH
2. Tukang Kayu 1.0000 OH
Jumlah 2.00 OH
Jumlah tenaga dipekerjakan = 6.00 OH
Kapasitas produksi per hari = 0.50 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 6.00 x 0.50 = 3.00 Bh
Waktu dibutuhkan = #REF! : 3.00 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

6. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0150 OH
2. Tukang Kayu 0.1500 OH
3. Kepala Tukang 0.0150 OH
4. Mandor 0.0008 OH
Jumlah 0.1808 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 5.53 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 5.53 = 5.53 M2
Waktu dibutuhkan = #REF! : 5.53 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Kaca Tebal 5 mm = 1.100 X #REF! = #REF! m2
2. Sealant = 0.050 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
1. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.1400 OH
2. Tukang besi 0.4000 OH
3. Kepala Tukang 0.0400 OH
4. Mandor 0.0700 OH
Jumlah 0.650 OH
Jumlah tenaga dipekerjakan = 12.00 OH
Kapasitas produksi per hari = 1.54 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 12.00 x 1.54 = 18.46 M2
Waktu dibutuhkan = #REF! : 18.46 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Baja profil C 75.75 = 0.420 X #REF! = #REF! M'
2. Reng U 0.5 = 0.350 X #REF! = #REF! M'
3. Baut Truss = 2.000 X #REF! = #REF! Buah
4. Baut Reng = 2.000 X #REF! = #REF! Buah
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.2000 OH
2. Tukang Kayu 0.1000 OH
3. Kepala Tukang 0.0100 OH
4. Mandor 0.0100 OH
Jumlah 0.320 OH
Jumlah tenaga dipekerjakan = 12.00 OH
Kapasitas produksi per hari = 3.13 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 12.00 x 3.13 = 37.50 M2
Waktu dibutuhkan = #REF! : 37.50 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Seng Spandex = 1.020 X #REF! = #REF! Lbr
2. Paku Skrup = 0.200 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.2500 OH
2. Tukang Kayu 0.1500 OH
3. Kepala Tukang 0.0150 OH
4. Mandor 0.0130 OH
Jumlah 0.428 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 2.34 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 2.34 = 9.35 M'
Waktu dibutuhkan = #REF! : 9.35 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Profil C 75.75 = 1.000 X #REF! = #REF! Lbr
2. Baut Reng = 11.000 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

5. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.1000 OH
2. Tukang Kayu 0.2000 OH
3. Kepala Tukang 0.0200 OH
4. Mandor 0.0050 OH
Jumlah 0.325 OH
Jumlah tenaga dipekerjakan = 5.00 OH
Kapasitas produksi per hari = 3.08 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 5.00 x 3.08 = 15.38 M'
Waktu dibutuhkan = #REF! : 15.38 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Papan Kayu klas II = 0.011 X #REF! = #REF! m3
2. Paku = 0.100 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
1. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.1000 OH
2. Tukang Kayu 0.2000 OH
3. Kepala Tukang 0.0200 OH
4. Mandor 0.0050 OH
Jumlah 0.325 OH
Jumlah tenaga dipekerjakan = 12.00 OH
Kapasitas produksi per hari = 3.08 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 12.00 x 3.08 = 36.92 M2
Waktu dibutuhkan = #REF! : 36.92 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Papan Kayu klas II = 0.011 X #REF! = #REF! m3
2. Paku = 0.100 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.1000 OH
2. Tukang Kayu 0.1000 OH
3. Kepala Tukang 0.0100 OH
4. Mandor 0.0050 OH
Jumlah 0.215 OH
Jumlah tenaga dipekerjakan = 8.00 OH
Kapasitas produksi per hari = 4.65 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 8.00 x 4.65 = 37.21 M2
Waktu dibutuhkan = #REF! : 37.21 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Triplex = 0.250 X #REF! = #REF! Lbr
2. Paku Triplex = 0.030 X #REF! = #REF! Kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0500 OH
2. Tukang Kayu 0.0500 OH
3. Kepala Tukang 0.0050 OH
4. Mandor 0.0030 OH
Jumlah 0.108 OH
Jumlah tenaga dipekerjakan = 4.00 OH
Kapasitas produksi per hari = 9.26 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 4.00 x 9.26 = 37.04 M'
Waktu dibutuhkan = #REF! : 37.04 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. List Gysum Profil = 1.050 X #REF! = #REF! m'
2. Paku = 0.010 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
###
###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.1800 OH
2. Pekerja 0.0600 OH
Jumlah 0.2400 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 4.17 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 4.17 = 8.33 Bh
Waktu dibutuhkan = #REF! : 8.33 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.1540 OH
2. Pekerja 0.0300 OH
Jumlah 0.1840 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 5.43 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 5.43 = 5.43 Bh
Waktu dibutuhkan = #REF! : 5.43 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu
2. ###
Volume pekerjaan = #REF! Ttk
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.2100 OH
2. Pekerja 0.0300 OH
Jumlah 0.2400 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 4.17 Ttk/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 4.17 = 8.33 Ttk
Waktu dibutuhkan = #REF! : 8.33 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

3. ###
Volume pekerjaan = #REF! Ttk
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.3200 OH
2. Pekerja 0.0500 OH
Jumlah 0.3700 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.70 Ttk/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.70 = 5.41 Ttk
Waktu dibutuhkan = #REF! : 5.41 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

###
###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.3200 OH
2. Pekerja 0.0300 OH
Jumlah 0.3500 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 2.86 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 2.86 = 2.86 Bh
Waktu dibutuhkan = #REF! : 2.86 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.3200 OH
2. Pekerja 0.0300 OH
Jumlah 0.3500 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 2.86 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 2.86 = 2.86 Bh
Waktu dibutuhkan = #REF! : 2.86 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

###
Volume pekerjaan = #REF! Bh
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.1000 OH
2. Pekerja 0.0210 OH
Jumlah 0.1210 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 8.26 Bh/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 8.26 = 8.26 Bh
Waktu dibutuhkan = #REF! : 8.26 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

5. ###
Volume pekerjaan = #REF! Unit
Tenaga kerja yang digunakan = Man Power
1. Tukang Listrik 0.1000 OH
2. Pekerja 0.0210 OH
Jumlah 0.1210 OH
Jumlah tenaga dipekerjakan = 1.00 OH
Kapasitas produksi per hari = 8.26 Unit/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 1.00 x 8.26 = 8.26 Unit
Waktu dibutuhkan = #REF! : 8.26 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

#REF! ###
1. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0700 OH
2. Tukang 0.0090 OH
3. Kepala Tukang 0.0060 OH
4. Mandor 0.0030 OH
Jumlah 0.0880 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 11.36 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 11.36 = 22.73 M2
Waktu dibutuhkan = #REF! : 22.73 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Cat Menie = 0.200 X #REF! = #REF! kg
2. Plamir = 0.150 X #REF! = #REF! kg
3. Cat Dasar = 0.170 X #REF! = #REF! kg
4. Cat Penutup = 0.260 X #REF! = #REF! kg
5. #REF! = #REF! X #REF! = #REF! ###
6. #REF! = #REF! X #REF! = #REF! ###
7. #REF! = #REF! X #REF! = #REF! ###
Jumlah Pemakaian Alat = Perlengkapan Kerja

2. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0200 OH
2. Tukang Cat 0.0630 OH
3. Kepala Tukang 0.0063 OH
4. Mandor 0.0030 OH
Jumlah 0.0923 OH
Jumlah tenaga dipekerjakan = 6.00 OH
Kapasitas produksi per hari = 10.83 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 6.00 x 10.83 = 65.01 M2
Waktu dibutuhkan = #REF! : 65.01 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Plamur = 0.100 X #REF! = #REF! kg
2. Cat Dasar = 0.100 X #REF! = #REF! kg
3. Cat Penutup = 0.260 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

3. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0200 OH
2. Tukang Cat 0.0630 OH
3. Kepala Tukang 0.0063 OH
4. Mandor 0.0030 OH
Jumlah 0.0923 OH
Jumlah tenaga dipekerjakan = 6.00 OH
Kapasitas produksi per hari = 10.83 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 6.00 x 10.83 = 65.01 M2
Waktu dibutuhkan = #REF! : 65.01 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Plamur = 0.100 X #REF! = #REF! kg
2. Cat Dasar = 0.100 X #REF! = #REF! kg
3. Cat Penutup = 0.260 X #REF! = #REF! kg
Jumlah Pemakaian Alat = Perlengkapan Kerja

4. ###
Volume pekerjaan = #REF! M2
Tenaga kerja yang digunakan = Man Power
1. Pekerja 0.0700 OH
2. Tukang Cat 0.0090 OH
3. Kepala Tukang 0.0060 OH
4. Mandor 0.0030 OH
Jumlah 0.0880 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 11.36 M2/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 11.36 = 22.73 M2
Waktu dibutuhkan = #REF! : 22.73 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Sesuai dengan analisa harga satuan
1. Cat Menie = 0.200 X #REF! = #REF! kg
2. Plamir = 0.150 X #REF! = #REF! kg
3. Cat Dasar = 0.170 X #REF! = #REF! kg
4. Cat Penutup = 0.260 X #REF! = #REF! kg
5. #REF! = #REF! X #REF! = #REF! ###
6. #REF! = #REF! X #REF! = #REF! ###
7. #REF! = #REF! X #REF! = #REF! ###
Jumlah Pemakaian Alat = Perlengkapan Kerja

#REF! ###
1. ###
Volume pekerjaan = #REF! Unit
Tenaga kerja yang digunakan = Man Power
1. Tukang 1.0000 OH
2. Pekerja 1.0000 OH
3. Mandor 1.0000 OH
Jumlah 3.0000 OH
Jumlah tenaga dipekerjakan = 6.00 OH
Kapasitas produksi per hari = 0.33 Unit/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 6.00 x 0.33 = 2.00 Unit
Waktu dibutuhkan = #REF! : 2.00 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

2. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Tukang 0.2800 OH
2. Pekerja 0.0320 OH
3. Mandor 0.0032 OH
Jumlah 0.3152 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 3.17 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 3.17 = 6.35 M'
Waktu dibutuhkan = #REF! : 6.35 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

3. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Tukang 0.3100 OH
2. Pekerja 0.0320 OH
3. Mandor 0.0032 OH
Jumlah 0.3452 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.90 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.90 = 5.79 M'
Waktu dibutuhkan = #REF! : 5.79 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap Kerja
Jumlah Pemakaian Alat = Alat-alat Bantu

4. ###
Volume pekerjaan = #REF! M3
Tenaga kerja yang digunakan = Man Power
1. Tukang 0.3100 OH
2. Pekerja 0.0320 OH
3. Mandor 0.0032 OH
Jumlah 0.3452 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.90 M3/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.90 = 5.79 M3
Waktu dibutuhkan = #REF! : 5.79 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Tanah Timbun
Jumlah Pemakaian Alat = Alat-alat Bantu

5. ###
Volume pekerjaan = #REF! Pkt
Tenaga kerja yang digunakan = Man Power
1. Tukang 0.3100 OH
2. Pekerja 0.0320 OH
3. Mandor 0.0032 OH
Jumlah 0.3452 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 2.90 Pkt/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 2.90 = 5.79 Pkt
Waktu dibutuhkan = #REF! : 5.79 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bunga
Jumlah Pemakaian Alat = Alat-alat Bantu

6. ###
Volume pekerjaan = #REF! Pkt
Tenaga kerja yang digunakan = Man Power
1. Tukang 1.0000 OH
2. Pekerja 1.0000 OH
3. Mandor 0.0032 OH
Jumlah 2.0032 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 0.50 Pkt/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 0.50 = 1.00 Pkt
Waktu dibutuhkan = #REF! : 1.00 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Tidak Ada Bahan
Jumlah Pemakaian Alat = Alat-alat Bantu

7. ###
Volume pekerjaan = #REF! M'
Tenaga kerja yang digunakan = Man Power
1. Tukang 0.6700 OH
2. Pekerja 0.0320 OH
3. Mandor 0.0032 OH
Jumlah 0.7052 OH
Jumlah tenaga dipekerjakan = 2.00 OH
Kapasitas produksi per hari = 1.42 M'/Orang/Hari ( 7 Jam / Hari Kerja)
Produksi per hari = 2.00 x 1.42 = 2.84 M'
Waktu dibutuhkan = #REF! : 2.84 = #REF! Hari = #REF! Hari
Dibulatkan = #REF! Minggu
Jumlah Pemakaian Bahan = Bahan Pelengkap
Jumlah Pemakaian Alat = Alat-alat Bantu
PEKERJAAN : PEMBANGUNAN RUMAH BIDAN DAN PENATAAN HALAMAN PUSKESMAS SANGGIRAN (OTSUS)
LOKASI : KABUPATEN SIMEULUE
TAHUN ANGGARAN : 2017
Bobot
Jumlah Harga
No. Uraian Kegiatan Volume Sat Rencana
(Rp)
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1.00 Ls 1,000,000.00 #REF! #REF!
2 Mobilisasi Dan Demobilisasi 1.00 Ls 4,000,000.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 Pengukuran dan Pemasangan Bowplank 1.00 Ls 4,000,000.00 #REF! #REF!
4 Pemasangan Papan Proyek 1.00 Unit 700,000.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 Administrasi Dan Dokumentasi 1.00 Paket 3,000,000.00 #REF! #REF!
B. PEKERJAAN TANAH DAN PONDASI
#REF!
1 Galian Tanah Pondasi menerus Bangunan 84.60 M3 11,044,360.80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
1 #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
1 #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
TOTAL BOBOT (%) #REF! #REF!
PROGRESS RENCANA MINGGUAN (%) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PROGRESS RENCANA KUMULATIF MINGGUAN (%) 0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
JADW

48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!

#REF! #REF!
#REF!

#REF! #REF!

#REF! #REF!

#REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF!
#REF! #REF!
#REF!

#REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!

#REF! #REF!
#REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
DWAL WAKTU PELAKSANAAN (KURVA-S)

Masa Pelaksanaan (180 Hari)


Rencana Hari Ke …
80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!

#REF!

#REF!
#REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF!

#REF! #REF!

#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF!
#REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF!

#REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF!
#REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!


#REF!
#REF!
#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF!


#REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!

#REF!
#REF! #REF!

#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!

#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!

#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!

#REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Ket (%)
176 177 178 179 180

1
#REF! #REF! #REF! #REF! #REF! 1
2
#REF! #REF! #REF! #REF!
#REF! #REF!

#REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF!
#REF! #REF!
#REF!

#REF!
#REF!
#REF! #REF!
#REF!

#REF! #REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF!
DAFTAR USULAN PERSONIL INTI
Pekerjaan : Pembangunan Asrama BLK
Penawar : CV. Damai Faakhi-Akhi

Tingkat Pengalaman No. & Tgl. Ijazah Dan No. & Tgl.
No Jabatan/ Posisi Nama Personil Tempat & Tanggal Lahir Profesi Keahlian Ket
Pendidikan Kerja SKA/SKT

A. Tenaga Ahli

1 Tenaga Ahli K3 Muliady, ST Langsa, 01/09/1986 S-I Teknik Sipil 5 Ahli K3 Konstruksi Muda SKA Dan Ijazah Terlampir

2 Project Manager Muzakkir, ST Lhokseumawe, 30/07/1981 S-I Teknik Sipil 5 Ahli Teknik Bangunan Gedung Muda SKA Dan Ijazah Terlampir

3 Site Manager Zeri Desmon, ST Padang, 03/12/1984 S-I Teknik Sipil 10 Ahli Teknik Bangunan Gedung Muda SKA Dan Ijazah Terlampir

B. TENAGA TEKNIS

1 Mandor Dahliana, ST Keutapang Caleue, 17/04/1982 S-I Teknik Sipil 8 Mandor Tukang Batu / Bata / Beton SKT Dan Ijazah Terlampir

Tenaga Losgistik Proyek Bangunan


2 Tenaga Logistik Husaini, ST Desa Kuta, 28/11/1985 S-I Teknik Sipil 8 Ijazah Terlampir
Gedung

Juru Gambar / CAD S-I Teknik


3 Ulil Amri, ST Takengon, 26/01/1982 7 Juru Gambar / Draftman Arsitektur SKT Dan Ijazah Terlampir
Operator Arsitektur
TENAGA TEKNIS
Pekerjaan : Pembangunan Asrama BLK
Penawar : CV. Damai Faakhi-Akhi

Tingkat Pengalaman No. & Tgl. Ijazah Dan No. & Tgl.
No Jabatan/ Posisi Nama Personil Tempat & Tanggal Lahir Profesi Keahlian Ket
Pendidikan Kerja SKA/SKT

A. Tenaga Ahli

1 Tenaga Ahli K3 Muliady, ST Langsa, 01/09/1986 S-I Teknik Sipil 5 Ahli K3 Konstruksi Muda SKA Dan Ijazah Terlampir

2 Project Manager Muzakkir, ST Lhokseumawe, 30/07/1981 S-I Teknik Sipil 5 Ahli Teknik Bangunan Gedung Muda SKA Dan Ijazah Terlampir

3 Site Manager Zeri Desmon, ST Padang, 03/12/1984 S-I Teknik Sipil 10 Ahli Teknik Bangunan Gedung Muda SKA Dan Ijazah Terlampir

B. TENAGA TEKNIS

1 Mandor Dahliana, ST Keutapang Caleue, 17/04/1982 S-I Teknik Sipil 8 Mandor Tukang Batu / Bata / Beton SKT Dan Ijazah Terlampir

Tenaga Losgistik Proyek Bangunan


2 Teknisi Logistik Husaini, ST Desa Kuta, 28/11/1985 S-I Teknik Sipil 8 Ijazah Terlampir
Gedung

Juru Gambar / CAD S-I Teknik Juru Gambar / Draftman Arsitektur


3 Ulil Amri, ST Takengon, 26/01/1982 7 SKT Dan Ijazah Terlampir
Operator Arsitektur (SKT Terlampir)
STRUKTUR PENGURUS PERUSAHAAN
CV. DAMAI FAAKHI-AKHI

IBNU HASAN

Direktur

FACHRURRAZI, ST JULIMAN NORMA NANDALIA, A. Md

Staff Teknis Wakil Direktur Staff Administrasi & Keuangan


RENCANA ORGANISASI PELAKSANAAN PEKERJAAN (STRUKTUR)

Tenaga Ahli K3

Muliady, ST

Project Manager Site Manager Mandor

Muzakkir, ST Zeri Desmon, ST Dahliana, ST

Tenaga Logistik Juru Gambar / CAD Operator

Husaini, ST Ulil Amri, ST


DAFTAR PERALATAN UTAMA MINIMAL YANG DIBUTUHKAN
Pekerjaan : Pembangunan Asrama BLK
Penawar : CV. Damai Faakhi-Akhi

Status Kepemilikan
Jumlah Kapasitas Atau
Tahun Peralatan Lokasi Alat
No Jenis Peralatan Peralatan Merk dan Type Kondisi (%) Ouput Pada
Pembuatan Saat Ini
(unit) Saat Ini Milik Sewa

1 Generator Set 1 Sokkia 2013 100 - - √ Sinabang

2 Concrete Mixer 2 Tiger 2015 100 0,35 M3 - √ Sinabang

3 Concrete Vibrator 1 Mikasa 2015 100 5,5 Hp - √ Sinabang

4 Peralatan Tukang 1 Set Pabrikasi 2015 100 - - √ Sinabang

5 Bar Cutter 1 Dynamic 2015 100 - - √ Sinabang

6 Mobil Pick Up 1 Mitsubishi 2015 100 2 M3 - √ Sinabang

7 Bor Listrik 3 DeWALT D25123K 2015 100 0-4,300 bpm - √ Sinabang

8 Mesin Las 1 SMAW 2016 100 900 - 1300 Watt - √ Sinabang

9 Kereta Sorong 5 Artco 2015 100 0,5 M3 - √ Sinabang