DESA LEMBANG
HARGA KEC.
HARGA
ENREKANG
No. Uraian Satuan RAB
(KLASTER III)
(Rp)
(Rp)
ALAT
UPAH
1 Pekerja 110000 110,000
2 Tukang 130000 130,000
3 Mandor 125000 125,000
DAFTAR HARGA BAHAN DAN UPAH
HARGA
NO URAIAN SATUAN
(Rp)
Bahan
1 Semen 40 kg 64,000 zak
2 Pasir 243,000 m3
3 Sirtu Kali 246,000 m3
4 Kerikil Sirtu 263,000 m3
5 Batu Gunung / Batu Belah 356,000 m3
6 Tanah Timbunan 139,000 m3
7 Papan Kls III Cetakan 3,597,000 m3
8 Papan Mal 20/2, P = 4 m 58,000 Lembar
9 Besi Beton (Polos) 15,000 kg
10 Paku Biasa 26,000 kg
11 Kawat Beton 37,000 kg
12 Bondek, t=0,75 mm 110,000 m2
13 Plastik 3,000 m2
Alat
1 Alat Bantu 145,000 set
2 Molen Beton 390,000 hr
3 Excavator 780,000 jam
4 Mobilisasi Excavator 3,000,000 1 Paket (PP)
5 Gerobak Dorong 650,000 buah
6 Skop 100,000 buah
7 Drum 390,000 buah
8 Tali 1,000 m'
Upah
1 Pekerja 110,000 oh
2 Tukang 130,000 oh
3 Mandor Lapangan 125,000 oh
Kabupaten : Jenis Prasarana
Kecamatan : Take Of Sheet Lokasi
Desa : Volume
PEKERJAAN LEVELING
Lapisan Sirtu (Leveling)
Panjang = 206.00 m
Lebar = 3.00 m
Tebal = 0.08 m
Volume = 49.44 m3
PEKERJAAN BETON
Panjang = 206.00 m
Lebar = 3.00 m
Tebal = 0.15 m
Volume = 92.70 m3
PEKERJAAN BEKISTING
Bekisting samping
Luasan Bekisting
Panjang = 206.00 m
Tebal = 0.15 m
= 2.00 sisi
= 61.80 m2
Jumlah Papan Bekisting
Panjang = 206.00 m
= 412.00 m 2 sisi
Panjang Papan mall = 4.00 m
Volume = 103.00 Lembar
Total Bekisting = 26.00 Lembar
PLASTIK COR
Luasan Bekisting
Panjang = 206.00 m
Lebar = 3.00 m
= 618.00 m2
Upah Bahan
No. Jenis Kegiatan Volume Satuan Tanah Papan Mall
Pekerja Tukang Ka. Kel. Semen 40 kg Pasir Kerikil Sirtu Sirtu Kali
Timbunan Lembar
1 Pembersihan Lapangan & Perataan 735.000 m2 0.100 - 0.050 - - - - - -
AHSP-CK.A.2.2.1.9 [ K3] 74.000 - 37.000 - - - - - -
2 Galian tanah biasa sedalam 1 m 0.000 m3 0.750 - 0.025 - - - - - -
AHSP-CK-A.2.3.1.1 - - - - - - - - -
3 Lapisan Sirtu 49.440 m3 0.300 - 0.010 - - - 1.200 - -
AHSP-CK-A.2.3.1.11 15.000 - - - - - 59.000 - -
4 Tanah Timbunan 30.900 m3 - - - - - - - 1.000 -
AHSP-SDA-B.05 a - - - - - - - 31.000 -
5 Pekerjaan Beton (Alat) 92.700 m3 1.323 0.189 0.132 8.150 0.543 0.762 -
AHSP-SDA-B.05 b 123.000 18.000 12.000 756.000 50.000 71.000 - - -
6 Bekisting 61.800 m2 0.520 0.260 0.026 - - - - - 1.000
AHSP-CK-A4.1.1.20 32.000 16.000 2.000 - - - - - 26.000
7 Plastik 618.000 m2 - -
- - - - - - - - -
Jumlah 244.000 34.000 51.000 756.000 50.000 71.000 59.000 31.000 26.000
Upah & Bahan ( Rp ) 110,000 130,000 125,000 64,000 243,000 263,000 246,000 139,000 58,000
Biaya ( Rp ) 26,840,000 4,420,000 6,375,000 48,384,000 12,150,000 18,673,000 14,514,000 4,309,000 1,508,000
Sub Total ( Rp ) 37,635,000 101,444,000
Alat
Sub Total 1) -
II. ALAT
1 Molen Beton 23.00 - 23.00 hari 390,000 -
2 Skop 2.00 - 2.00 buah 100,000 -
3 Drum 1.00 - 1.00 buah 390,000 -
4 Tali 63.00 - 63.00 m 1,000 -
5 Alat Bantu 2.00 - 2.00 set 145,000 -
Sub Total 2) -
III. U P A H
1 Pekerja 242.00 - 242.00 HOK 110,000 -
2 Tukang 34.00 - 34.00 HOK 130,000 -
3 Kepala Kelompok 51.00 - 51.00 HOK 125,000 -
Sub Total 3) -
IV. TRANSPARANSI
1 Tanda Pengenal Kegiatan 1.00 - 1.00 bh 100,000 -
2 Prasasti 1.00 - 1.00 bh 500,000 -
Sub Total 4) -
V. HONOR TPK
1 Ketua 1.00 - 1.00 OB 175,000 -
2 Sekretaris 1.00 - 1.00 OB 150,000 -
3 Anggota 2.00 - 2.00 OB 115,000 -
Sub Total 5) -
TOTAL BIAYA -
Lembang, 20
DISETUJUI / MENGESAHKAN TELAH DIVERIFIKASI
KEPALA DESA SEKERTARIS DESA PELAKSANA KEGIATA
0 ______________________
FORMULIR
RAB - DESA
2.2.2
Jumlah Harga
Jumlah
DANA DESA Total
( Rp. ) ( Rp. )
48,384,000 48,384,000
12,150,000 12,150,000
18,673,000 18,673,000
14,514,000 14,514,000
4,309,000 4,309,000
1,566,000 1,566,000
52,000 52,000
1,869,000 1,869,000
101,517,000 101,517,000
8,970,000 8,970,000
200,000 200,000
390,000 390,000
63,000 63,000
290,000 290,000
9,913,000 9,913,000
26,620,000 26,620,000
4,420,000 4,420,000
6,375,000 6,375,000
37,415,000 37,415,000
100,000 100,000
500,000 500,000
600,000 600,000
175,000 175,000
150,000 150,000
230,000 230,000
555,000 555,000
150,000,000 150,000,000
DESA LEMBANG
KECAMATAN ENREKANG
KABUPATEN ENREKANG
IDENTITAS APARAT
PEMBERSIHAN
Panjang 206.00 m
Lebar 3.50 m
LEVELING
Panjang 206.00 m
Lebar 3.00 m
Tebal 0.05 m
BETON
Panjang 206.00 m
Lebar 3.00 m
Tebal 0.15 m
BEKISTING
Panjang 206.00 m
URUGAN TANAH
A. BAHU JALAN
Panjang - m
Lebar - m (2sisi)
Tebal - m
B. BAGIAN TENGAH
Panjang - m
Lebar - m
Tebal - m
DESA LEMBANG
KECAMATAN ENREKANG, KABUPATEN ENREKANG
TAHUN ANGGARAN 2019