B. BAHAN ATAP
No. Uraian Satuan Harga Satuan (Rp) Keterangan
1 Sirap Buah 4,000.00
2 Genteng Metal Deuck M2 96,300.00
3 Genteng Metal Roof Lembar 45,000.00
4 Bubungan Genteng Metal Roof Buah 35,000.00
5 Genteng Lokal Buah 2,000.00
6 Genteng Bubungan Lokal Buah 6,000.00
7 Genteng Beton/Press Buah 13,500.00
8 Genteng Bubungan Beton Buah 1,400.00
9 Genteng Silang/Kodok Buah 1,700.00
10 Genteng Bubungan Silang Buah 5,500.00
11 Genteng Pejaten Buah 1,750.00
12 Genteng Bubungan Pejaten Buah 7,000.00
13 Genteng Kaca Buah 36,000.00
14 Genteng Glazur (Kw I ) Buah 33,000.00
15 Genteng Bubungan Glazur (Kw I ) Buah 42,000.00
16 Genteng Glazur (Kw II ) Buah 29,000.00
17 Genteng Bubungan Glazur (Kw II ) Buah 46,000.00
18 Ijuk Atap Kg 17,500.00
19 Ijuk Bronjong Kg 12,500.00
20 Asbes Type Genteng (Tyluq) Lembar 60,000.00
21 Asbes Gelombang Kecil Lembar 40,000.00
22 Asbes Gelombang Besar Lembar 50,000.00
23 Asbes Bubungan Gelomb. Kecil Lembar 40,150.00
24 Asbes bubungan Gelomb. Besar Lembar 44,275.00
25 Seng Gelombang Besar BJLS 20 Lembar 57,000.00
26 Seng Gelombang Besar BJLS 25 Lembar 66,000.00
27 Seng Gelombang Besar BJLS 30 Lembar 84,500.00
28 Seng Gelombang Kecil BJLS 20 Lembar 55,000.00
29 Seng Plastik BJLS 20 M' 63,800.00
30 Seng Plat BJLS 25 M' 67,500.00
31 Seng Plat BJLS 30 M' 80,000.00
32 Karet Talang M' 165,000.00
33 Polycarbonate 9 mm M2 195,000.00
C. BAHAN KAYU
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Papan Kayu Kls I M3 7,000,000
Reng ( 2 x 3 ) cm M3 7,000,000
2 Balok Kayu Kls I M3 6,500,000
Kaso - Kaso ( 5 x 7 ) cm M3 6,500,000
Balok Kayu ( 6 x 12 ) cm M3 6,500,000
3 Papan Kayu Kls II M3 5,000,000
4 Balok Kayu Kls II M3 4,500,000
Kaso - Kaso ( 5 x 7 ) cm M3 4,500,000
Balok Kayu ( 6 x 12 ) cm M3 4,500,000
Reng ( 2 x 3 ) cm M3 4,500,000
5 Papan Kayu Kls III M3 3,000,000
6 Balok Kayu Kls III M3 2,500,000
Kaso - Kaso ( 5 x 7 ) cm M3 2,500,000
Balok Kayu ( 6 x 12 ) cm M3 2,500,000
7 Dolken/Perancah Diameter 10 cm Batang 40,000
Perancah bambu Batang 8,000
8 List Kaca M' 1,750
9 List Profil Kayu M' 15,000
10 Papan Kayu Begisting M3 2,100,000
11 Balok Kayu Begisting M3 2,000,000
D. BAHAN BAMBU
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Bambu Besar ³ 12.5 cm - 6 m Batang 45,000
2 Bambu Sedang ³ 10 cm - 6 m Batang 34,000
3 Bambu Kecil ³ 7cm - 6 m Batang 25,000
4 Bambu Gunung (10 Btg) 4 M M2 47,500
5 Bedek Kulitan M2 75,000
6 Bedek Biasa M2 35,000
E. BAHAN CETAK
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Roster Kecil Buah 7,500
2 Roster Sedang Buah 10,500
3 Roster Besar Buah 12,000
4 Lubang Angin 10 x 20 cm Buah 46,000
5 Lubang Angin 20 x 20 cm Buah 65,000
6 Lubang Angin Batu Alam Buah 122,000
7 Buis Beton Diameter 10 cm Buah 67,000 L = 1m
8 Buis Beton Diameter 20 cm Buah 78,000 L = 1m
9 Buis Beton Diameter 40 cm Buah 93,000 L = 1m
10 Buis Beton Diameter 60 cm Buah 145,000 L = 0.5 m
11 Buis Beton Diameter 80 cm Buah 190,000 L = 0.5 m
12 Batako 10 x 20 x 40 cm Buah 4,600
13 Paving Blok Press Type Bata Biji 1,900
14 Paving Blok Biasa Type Berlian Biji 2,700
15 Kerab Beton / Kanstin Biji 65,000
F. BAHAN LANTAI
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Tegel Abu-abu 20 x 20 cm M2 45,000
2 Tegel Bergaris Abu-abu 20 x 20 cm M2 50,000
3 Tegel Warna 20 x 20 cm M2 48,500
4 Tegel Bergaris Warna 20 x 20 cm M2 55,000
5 Tegel Traso Klas I 30 x 30 cm M2 52,200
6 Tegel Traso Klas II 30 x 30 cm M2 50,500
7 Keramik Dinding Kwalitas I M2 72,000
8 Keramik Dinding Kwalitas II M2 68,000
9 Tegel Keramik Kualitas I M2 95,000
10 Tegel Keramik Kualitas II M2 66,500
11 Keramik Mozaik M2 220,000
12 Keramik Cutting M2 135,000
13 Porselin Kualitas I (Polos) M2 66,000
14 Porselin Kualitas I (motif) M2 75,000
15 Porselin Kualitas II (motif) M2 62,000
16 Marmer Kualitas I M2 500,000
17 Marmer Kualitas II M2 370,000
18 Granit
- Granit Kw I M2 550,000
- Granit Kw II M2 350,000
19 Batu Alam Andesit
- Andesit Biasa M2 167,000
- Andesit Susun sirih M2 197,000
- Andesit Motif M2 212,000
20 Batu alam candi
- Candi Biasa M2 153,000
- Candi Susun Sirih M2 173,000
- Candi Motif M2 315,000
21 Batu alam Palimanan M2 162,000
22 Batu alam Palimanan Motif M2 292,000
23 Batu alam Giring M2 126,000
24 Batu alam Marmo
- Marmo Biasa M2 170,000
Marmo Susun Sirih M2 180,000
Marmo Motif M2 382,000
25 Lampu batu alam kecil Buah 200,000
26 Lampu batu alam Besar Buah 280,000
27 Paving Block Tipe Bata Biji
28 Paving Block Tipe Tiga Berlian Biji
H. BAHAN LANGIT-LANGIT
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Eternit 100 x 100 cm Lembar 23,000
2 Tripleks 120 x 240 x 2 mm Lembar 38,500
3 Tripleks 120 x 240 x 3 mm Lembar 52,000
4 Tripleks 120 x 240 x 6 mm Lembar 85,000
5 Tripleks 120 x 240 x 9 mm Lembar 125,000
6 Tripleks 120 x 240 x 12 mm Lembar 175,000
7 Tripleks 120 x 240 x 18 mm Lembar 260,000
8 Panel Gipsum (6mm x 122 x 242 c Lembar 70,000
9 Teakwood 120 x 240 x 3 mm Lembar 100,000
10 Formika Putih 120 x 240 x 2 mm Lembar 110,000
11 Formika Warna 120 x 240 x 3 mm Lembar 120,000
12 Lem Kayu Kg 30,000
I. BAHAN KACA
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Kaca Polos 3 mm M2 78,000
2 Kaca Polos 5 mm M2 110,000
3 Kaca Riben 3 mm M2 98,000
4 Kaca Riben 5 mm M2 118,000
5 Kerangka Nako 5 mm M2 120,000
6 Kaca Dop/Kaca Es M2 65,000
7 Kaca Pateri/Motif M2 300,000
8 Glass Block Buah 52,000
J. BAHAN FINISHING
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Amplas Kayu Lembar 5,000
2 Plamir Kayu Kg 23,000
3 Spritus Liter 16,000
4 Minyak Cat Liter 23,000
5 Minyak Cat A Spesial Liter 25,000
6 Residu Liter 17,500
7 Teak Oil Liter 47,000
8 Meni Besi Kg 25,000
9 Meni Kayu Kg 25,000
10 Cat Kayu Mutu Menengah Kg 40,500
11 Cat Kayu Mutu Tinggi Kg 50,500
12 Cat Tmbk Mutu Menengah Kg 31,000
13 Cat Tmbk Mutu Tinggi Kg 47,000
14 Cat Besi Kg 55,000
15 Cat Genteng Kg 51,500
16 Plamir Tembok Kg 20,000
17 Teer Kg 10,000
18 Politur Liter 47,000
19 Cat Marka Jalan Scalato Kg 72,500
20 Cat Marka Jalan Biasa Kg 71,000
21 Kuas Kecil Buah 14,000
Kuas sedang Buah 16,000
Kuas Besar Buah 18,500
22 Cairan Pengupas Cat Kg 192,000
23 Cairan Pengeras Cat (Hardner) Kg 176,000
24 Politur Dasar Liter 47,000
25 List Kayu M' 12,000
26 Rol Cat Buah 27,000
K. BAHAN SANITAIRE
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Kloset Duduk KW 1 + Acc Buah 3,500,000
Kloset Duduk KW 2 + Acc Buah 3,000,000
2 Kloset Jongkok Teraso Buah 110,000
Kloset Jongkok Plastik Buah 80,000
3 Kloset Jongkok Porselen KW 1 Buah 200,000
Kloset Jongkok Porselen KW 2 Buah 155,000
4 Wastafel KW 1 Buah 600,000
Wastafel KW 2 Buah 360,000
5 Urinoir Porselen KW 1 Buah 1,500,000
Urinoir Porselen KW 2 Buah 400,000
6 Saringan Air Besi Buah 30,000
7 Saringan Air Plastik Buah 10,000
8 Bak Cuci Piring Teraso Buah 355,000
9 Bak Cuci Piring Logam Buah 320,000
10 Reservoir Fiberglass Kap. 1 m3 Buah 1,904,000
11 Septic Tank Kapasitas 1 m3 Buah 3,000,000
12 Septic Tank Kapasitas 2 m3 Buah
13 Bak Fiberglass Kap. 0.5 m3 Buah 650,000
14 Bak Mandi Plastik Kap. 0.5 m3 Buah 295,000
15 Bak Mandi Teraso Kap. 50x50 cm Buah 315,000
16 Kran Air 3/4" KW I Buah 41,000
17 Kran Air 3/4" KW II Buah 37,000
18 Kran Air 1/2" KW I Buah 25,000
19 Kran Air 1/2" KW II Buah 21,500
20 Shower KW 1 Buah 350,000
21 Shower Kw 2 Buah 200,000
L. BAHAN PAKU
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Paku Panjang 1 - 3 cm Kg 21,000
2 Paku Panjang 4 - 6 cm Kg 21,000
3 Paku Panjang 7 - 12 cm Kg 21,000
4 Paku Seng Kg 26,000
5 Paku Asbes Buah 34,000
6 Sekrup/Piles 1.5 cm Doz 15,000
7 Sekrup/Piles 2.0 cm Doz 28,500
8 Paku Sumbat Buah 1,700
9 Besi Beugel/Baut (Kuda-kuda) Kg 32,000
10 Paku Anti Karat Kg 35,000
N. BAHAN TAMBAHAN
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Aspal (AC) Kg
2 Kayu Bakar m3 260,000
3 Oli SAE 30 Liter 29,500
4 Oli SAE 40 Liter 30,600
5 Oli SAE 90 Liter 35,000
6 Oli SAE 100 Liter 39,000
7 Aspal Emulsi Kg
8 Flux Oil Liter 30,000
9 Alat Bantu Bina Marga Set 65,000
10 Alat Bantu Pengairan Set 65,000
11 Alat Bantu Bangunan Set 100,000
12 Alat Bantu Perpipaan Set 105,000
13 Sambungan Rumah 1/2" Set
14 Sambungan Rumah 3/4" Set
15 Sambungan Rumah 1" Set
16 Solar Untuk Industri Liter 16,800
17 Solar Untuk Rumah Tangga Liter 5,500
18 Bensin Liter 13,160
19 Minyak Tanah Liter
O. BAHAN PIPA
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
PIPA
1 Pipa GIP Diameter 1" m' 42,500
2 Pipa GIP Diameter 1.5" m' 47,500
3 Pipa GIP Diameter 2" m' 53,750
4 Pipa GIP Diameter 3" m' 87,500
5 Pipa GIP Diameter 4" m' 102,500
6 Pipa GIP Diameter 6" m' 200,000
7 Pipa GIP Diameter 8" m' 500,000
8 Pipa GIP Diameter 10" m' 700,000
9 Pipa GIP Diameter 12" m' 900,000
10 Pipa ACP Diameter 6" m' 192,400
11 Pipa ACP Diameter 8" m' 293,000
12 Pipa ACP Diameter 10" m' 368,300
13 Pipa ACP Diameter 12" m' 554,100
Pipa PVC Type S 12,5
14 Pipa PVC Diameter 1" m' 9,000
15 Pipa PVC Diameter 1.5" m' 21,300
16 Pipa PVC Diameter 2" m' 31,000
17 Pipa PVC Diameter 3" m' 63,000
18 Pipa PVC Diameter 4" m' 93,000
19 Pipa PVC Diameter 6" m' 200,000
20 Pipa PVC Diameter 8" m' 320,000
21 Pipa PVC Diameter 10" m' 500,000
22 Pipa PVC Diameter 12" m' 800,000
23 Pipa PVC Diameter 14" m' 980,000
24 Pipa PVC Diameter 16" m' 1,350,000
Pipa PVC Type AW
25 Pipa AW Diameter 1/2" m' 6,250
26 Pipa AW Diameter 3/4" m' 8,100
27 Pipa AW Diameter 1" m' 10,000
28 Pipa AW Diameter 1,5" m' 11,500
29 Pipa AW Diameter 2" m' 17,000
30 Pipa AW Diameter 3" m' 27,500
31 Pipa AW Diameter 4" m' 40,000
32 Pipa AW Diameter 6" m' 80,000
33 Pipa AW Diameter 8" m' 115,000
ACCESSORIES
A. Tee All Socket PVC (RRJ)
1 DN 200 x 200 mm Buah
2 DN 200 x 150 mm Buah
3 DN 200 x 100 mm Buah
4 DN 200 x 75 mm Buah
5 DN 200 x 50 mm Buah
6 DN 150 x 150 mm Buah
7 DN 150 x 100 mm Buah
8 DN 150 x 75 mm Buah
9 DN 150 x 50 mm Buah
10 DN 100 x 100 mm Buah
11 DN 100 x 75 mm Buah
12 DN 100 x 50 mm Buah
13 DN 75 x 75 mm Buah
14 DN 75 x 50 mm Buah
15 DN 50 x 50 mm Buah
L. Flange Bend CI
1 - DN 250 mm Buah -
2 - DN 150 mm Buah -
3 - DN 75 mm Buah -
M. Air Valve
1 - DN 75 mm Buah -
2 - DN 50 mm Buah -
3 - DN 25 mm Buah -
Q. Lubricant/Pelumas Kali -
S. Pengetesan Pipa
1 - DN. 300 mm Buah -
2 - DN. 250 mm Buah -
3 - DN. 200 mm Buah -
4 - DN. 150 mm Buah -
5 - DN. 100 mm Buah -
6 - DN. 75 mm Buah -
7 - DN. 50 mm Buah -
T. Pengetesan Pipa
1 - DN. 300 mm Buah -
2 - DN. 250 mm Buah -
3 - DN. 200 mm Buah -
4 - DN. 150 mm Buah -
5 - DN. 100 mm Buah -
6 - DN. 75 mm Buah -
7 - DN. 50 mm Buah -
U. Lain-lain
1 Filter Oli Buah -
2 Filter Udara Buah -
3 Filter Solar Buah -
4 Rubbet Cople ST. 038 Buah -
5 Rubbet Cople H. 110 Buah -
6 Rubbet Cople Bulat Buah -
7 Rubbet Cople H Buah -
8 Kaporit Kadar 60% Kg -
9 Lem Pipa Kg 140,000.00
10 Seltip Kecil Bh 2,500.00
O. BAHAN PENGUNCI
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Kunci Pintu 1 Slag KW I Buah 160,000.00
2 Kunci Pintu 1 Slag KW II Buah 130,000.00
3 Kunci Pintu 2 Slag KW I Buah 180,000.00
4 Kunci Pintu 2 Slag KW II Buah 110,000.00
5 Handle KW I Buah 320,000.00
6 Handle KW II Buah 110,000.00
7 Haag Angin Besar Buah 15,000.00
8 Haag Angin Kecil Buah 8,000.00
9 Grendel Besar Buah 22,000.00
10 Grendel Kecil Buah 8,000.00
11 Engsel Nylon Set 14,500.00
12 Engsel Kupu-kupu Set 12,000.00
13 Engsel H Buah 9,000.00
14 Expagnolet Buah 68,000.00
PERALATAN
1 Gunting Taman Kecil Buah -
2 Cetok Buah -
3 Sapu Lidi Buah -
4 Cikrak Buah -
5 Selang Hisap Diameter 2" M' -
6 Selang Hisap Diameter 3" M' -
7 Selang Buang M' -
8 Sumur Tancap PVC M' -
1 Playwood 4 MM Lbr -
2 Panel Beton Pracetak etr -
3 Kolom Beton Pracetak Btg -
4 Strorox Kg 255,000.00
5 Waterstop m 80,000.00
6 Minyak Begisting etr 42,000.00
7 Penjaga Jarak Bekistig/Spacer Bh 45,000.00
8 Besi Hollow 30-50,3 Kg -
9 Phenol Flm 12mm Ltr -
10 Dinabolt dia 12mm (10-15cm) Bh 3,000.00
11 Besi Profil Kg 18,400.00
12 Besi Baja IWF Kg 19,000.00
13 Besi siku L 30-30,3 Kg 40,700.00
14 Besi Plat Baja Kg 45,000.00
15 Kawat Las Listrik Kg 33,000.00
16 Besi Stip Baja Kg 18,040.00
17 Besi Scuare Tube m 6,000.00
18 Besi Lis kaca(1x1)cm m 260,000.00
19 Penjelasan cm -
20 Pintu Gulung Besi(Rolling Door) m2 570,000.00
21 Pintu Lipat (Folding door) m2 1,000,000.00
22 Suns Creen allumunium m2 352,000.00
23 Rolling door alumunium m2 520,000.00
24 Profil alumunium M 60,000.00
25 Skrup Fixer Biji 250.00
26 Sealant Tube 35,000.00
27 Alumunium Strip m 30,000.00
28 Pintu alumunium Buah 850,000.00
29 Venetions blinnds m2 120,000.00
30 Vertical Blinds ( tirai ) m2 120,000.00
31 Baja Strip (0,2x2 ) cm Kg 18,040.00
32 Rangka metal hollow 40 40.2mm m 22,500.00
33 Kapur Padam m3 -
34 HB - 20 m3 800.00
35 HB - 15 m3 800.00
36 HB - 10 m3 800.00
37 Bata Roster m3 -
38 Bata Berongga m3 -
39 Batu Granit bh 11,440.00
40 Ubin Teralux Marmer bh -
41 Plint Ubin Pc bh -
42 Plint Ubin Granit bh -
43 Plint Ubin Traso bh -
44 Plint Ubin Teralux kerang bh 206,000.00
45 Plint ubin Teralux marmer bh 269,600.00
46 Interval Cove bh -
47 Karpet bh 94,380.00
48 Underlayer m2 101,640.00
49 Parguet m2 130,680.00
50 Porslen bh 1,200.00
51 Batu paras bh 65,400.00
52 Batu temple hitam bh 2,500.00
53 Vynil bh 108,900.00
54 Wallpaper m -
55 Floor Haiderner kg -
56 Akuistik lbr -
57 Gypsum Board lbr 68,400.00
58 Profil allum T m -
59 Ramset bh -
60 Rooflight 90 x 180 ltr -
61 Plastic aeratur bh -
62 Asbes Gelombang Uk 92 x 250 cm lbr 65,000.00
63 C.75, 100 m 12,500.00
64 C.75, 75 m 11,000.00
65 Reng m 6,000.00
66 Baut (screw drive) m 1,050.00
67 Dynabolt m 4,000.00
68 Plat Blancing m 30,000.00
HARGA SATUAN UPAH
TAHUN ANGGARAN 2015
No Uraian Satuan Harga Satuan (Rp) Keterangan
1 Buruh Tak Terampil OH 60,000
2 Buruh Semi Terampil OH 70,000
3 Buruh Terampil OH 75,000
4 Pekerja OH 70,000
5 Mandor OH 50,000
6 Tukang Batu OH 110,000
7 Kepala Tukang Batu OH 115,000
8 Kepala Profil Batu / Kayu OH 125,000
9 Tukang Kayu OH 110,000
10 Kepala Tukang Kayu OH 115,000
11 Tukang Besi Beton OH 110,000
12 Kepala Tukang Besi Beton OH 115,000
13 Tukang Las OH 110,000
14 Kepala Tukang Las OH 115,000
15 Tukang Politur OH 110,000
16 Tukang Cat OH 115,000
17 Kepala Tukang Cat OH 110,000
18 Kepala Tukang Pipa OH 115,000
19 Tukang Pipa OH 110,000
20 Pemecah Batu OH 65,000
21 Jaga Malam OH 65,000
22 Penggergaji OH 65,000
23 Penggosok Tegel OH 60,000
24 Pengisi Bronjong OH 55,500
25 Penganyam Bronjong OH 62,500
26 Kepala Penganyam Bronjong OH 65,000
27 Pemasak Aspal OH 65,000
28 Sopir OH 95,000
29 Pembantu Sopir OH 62,500
30 Mekanik OH 100,000
31 Mekanik Pembantu OH 72,500
32 Operator Alat Ringan OH 95,000
33 Operator Alat Berat Terampil OH 125,000
34 Operator Alat Berat Semi Teramp OH 105,000
35 Pembantu Operator OH 75,000
36 Operator Pompa TL OH 70,000
37 Tukang Listrik OH 90,000
38 Kepala Tukang Listrik OH 95,000
39 Sopir Material OH 95,000
2,009
RENCANA ANGGARAN BIAYA
(RAB)
1 2 3 4
I PEKERJAAN PENDAHULUAN
1 Papan Nama Kegiatan 1.00 Unit
2 Pengukuran dan Pemasangan Bowplank 1.00 Pkt
II PEKERJAAN TANAH
1 Galian Tanah 24.66 M³
2 Urugan Kembali 8.14 M³
3 Urugan Tanah Di Bawah Lantai Dipadatkan 16.26 M³
4 Urugan Pasir Di Pondasi Dan Bawah Lantai 7.20 M³
IV PEKERJAAN BETON
1 Pembesian Dengan Besi Beton Polos / Ulir 246.32 Kg
2 Beton Sloof 15/20 cm 0.90 M³
3 Beton Kolom Praktis 13/20 cm 0.31 M³
4 Beton Kolom Praktis 13/13 cm 0.51 M³
5 Beton Kolom Teras 20/20 cm 0.17 M³
6 Balok Latei 16.00 M'
7 Ring Balok 38.00 M'
8 Balok Gantung 12.00 M'
9 Memasang Begisting Untuk Sloof 3.96 M²
10 Memasang Begisting Untuk Kolom 5.00 M²
V PEKERJAAN PLESTERAN DAN LANTAI
1 Plesteran Dinding Tebal 15 mm 1Pc : 3Ps 11.60 M²
2 Plesteran Dinding Tebal 15 mm 1Pc : 5Ps + Acian 222.02 M²
3 Memasang Lantai Keramik ( 40x40 ) cm 72.00 M²
1 2 3 4
Total A
B. PENGADAAN PERABOT
1 Kursi Guru 1.00 Buah
2 Meja Guru 1/2 Biro 1.00 Buah
3 Meja Siswa 20.00 Buah
4 Kursi Siswa 20.00 Buah
5 Papan Tulis 1.00 Lembar
Total B
REKAPITULASI RENCANA ANGGARAN BIAYA
1 2
B. PENGADAAN PERABOT
JUMLAH
PPN ( 10 % )
TOTAL
DIBULATKAN
Terbilang : Seratus Dua Puluh Dua Juta Lima Ratus Ribu Rupiah
Disetujui,
Pejabat Pembuat Komitmen Pendidikan Dasar
Dinas Pendidikan, Pemuda dan Olahraga
Kabupaten Bima
Diperiksa,
Kepala Dinas Pekerjaan Umum
Kabupaten Bima
DN 9 SILA ( 2 RKB )
5 6 7
5 6 7
-
SNI-DT 91-0018-2007. 14 14,269.00 2,666,819.02 2.44
SNI-DT 91-0018-2007. 14 14,269.00 - -
SNI-DT 91-0018-2007. 8 28,680.00 856,224.19 0.78
SNI-DT 91-0018-2007. 20b 27,250.00 - -
SNI-DT 91-0018-2007. 11 41,204.00 131,852.80 0.12
SNI-DT 91-0018-2007. 12 10,230.00 - -
3,654,896.02
-
Ls 180,000.00 180,000.00 0.16
Ls 14,500.00 43,500.00 0.04
Ls 12,000.00 264,000.00 0.24
Ls 25,000.00 25,000.00 0.02
Ls 9,000.00 99,000.00 0.09
Ls 30,000.00 660,000.00 0.60
Ls 2,500.00 90,000.00 0.08
SNI-DT 91-0017-2007. 17a 142,160.00 443,539.20 0.41
1,805,039.20
-
Ls 140,000.00 840,000.00 0.77
Ls 50,000.00 50,000.00 0.05
Ls 15,000.00 15,000.00 0.01
Ls 20,000.00 20,000.00 0.02
Ls 16,000.00 96,000.00 0.09
Ls 14,500.00 - -
Ls 225,000.00 - -
1,021,000.00
-
Ls 250,000.00 - -
- -
Total A 95,291,222.10
Ls 250,000.00 250,000.00
Ls 400,000.00 400,000.00
Ls 265,000.00 5,300,000.00
Ls 200,000.00 4,000,000.00
Ls 4,000,000.00 4,000,000.00
13,950,000.00
Total B 13,950,000.00
24,029,251.99
NA ANGGARAN BIAYA
Jumlah Harga
(Rp.)
3
Rp. 13,950,000.00
Rupiah
Bima, Maret 2014
Dihitung,
Konsultan Perencana
CV. FIBON ARCHITEC
HERMANSYAH, A.Md.T
Direktur
Mengetahui,
Kepala Dinas Pendidikan, Pemuda dan Olahraga
Kabupaten Bima
TAJUDDIN, SH, M. Si
NIP. 19681231 199303 1 120
0.90
0.31
0.51
0.70
2.43
\
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
1 Pengukuran dan Pemasangan Bouwplank
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M' HARGA SATUAN ( Rp ) 144,500.00
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN
-
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 9,500.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
3 Pembuatan Jalan Sementara
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 120,530.00
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 483,340.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
5 Bongkaran Dinding Tembok Bata Merah
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 468,340.00
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M¹ HARGA SATUAN ( Rp ) 203,610.00
ANALISA BIAYA PEKERJAAN KODE
gukuran dan Pemasangan Bouwplank SNI-DT 91-0005- 144,500.00 M'
2007. 4
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
12,500.00
7,000.00
1,100.00
250.00
78,000.00
150.00
45,500.00
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 144,500.00
Per M'
7,000.00
2,500.00
SUB JUMLAH ( Rp ) -
BIAYA SUB TOTAL
( Rp ) ( Rp )
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 9,500.00
Per M²
ANALISA BIAYA PEKERJAAN KODE
Pembuatan Jalan Sementara SNI-DT 91-0005- 120,530.00 M³
2007. 12
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
70,000.00
2,500.00
27,750.00
20,250.00
30.00
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 120,530.00
Per M³
466,690.00
16,650.00
SUB JUMLAH ( Rp ) -
BIAYA SUB TOTAL
( Rp ) ( Rp )
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 483,340.00
Per M³
ANALISA BIAYA PEKERJAAN KODE
ngkaran Dinding Tembok Bata Merah SNI-DT 91-0005- 468340 M³
2007. 14
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
466,690.00
1,650.00
SUB JUMLAH ( Rp ) -
BIAYA SUB TOTAL
( Rp ) ( Rp )
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 468,340.00
Per M³
2,940.00
440.00
4,830.00
100.00
195,300.00
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 203,610.00
Per M¹
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
7 Menggali Tanah Biasa Sedalam 1m'
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 53,750.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 65,250.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
9 Menggali Tanah Keras Sedalam 1 m'
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 71,600.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
11 Menggali Tanah Lumpur Sedalam 1 m'
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 86,250.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 86,250.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
13 Membuang Tanah Sejauh 30 m'
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 23,600.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
14 Urugan Kembali Galian Tanah Biasa Sedalam 1 m'
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 17,916.67 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 21,750.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
16 Urugan Kembali Galian Tanah Keras Sedalam 1 m'
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 23,843.33 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 36,000.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
18 Pemadatan Tanah ( Per 20 cm )
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 37,500.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
20 Urugan Sirtu Untuk Lantai Bangunan
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) ### Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 96,750.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
22 Tanah Urug Pilihan
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
23 Pemasangan Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 86,250.00 Per
KODE
A. 2.3.1.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
53,750.00
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
53,750.00
M³
KODE
A. 2.3.1.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
65,250.00
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
65,250.00
M³
KODE
A. 3.2.1.4
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
71,600.00
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
71,600.00
M³
KODE
A. 3.2.1.5
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
108,000.00
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
108,000.00
M³
KODE
A. 3.2.1.6
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
86,250.00
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
86,250.00
M³
KODE
A. 3.2.1.7
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
86,250.00
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
86,250.00
M³
KODE
A. 2.3.1.8
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
23,600.00
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
23,600.00
M³
KODE
A. 2.3.1.9.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
17,916.67
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
17,916.67
M³
KODE
A. 2.3.1.9.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
21,750.00
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
21,750.00
M³
KODE
A. 2.3.1.9.3
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
23,843.33
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
23,843.33
M³
KODE
A. 2.3.1.9.4
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
36,000.00
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
36,000.00
M³
KODE
A. 3.2.1.10
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
37,500.00
SUB TOTAL
( Rp )
-
SUB TOTAL
( Rp )
-
37,500.00
M³
KODE
A. 3.2.1.11
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
21,500.00
SUB TOTAL
( Rp )
156,000.00
SUB TOTAL
( Rp )
-
177,500.00
M³
KODE
A. 3.2.1.15
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
18,750.00
SUB TOTAL
( Rp )
132,000.00
SUB TOTAL
( Rp )
-
150,750.00
M³
KODE
SNI-DT 91-0006-
2007. 15a
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
18,750.00
SUB TOTAL
( Rp )
78,000.00
SUB TOTAL
( Rp )
-
96,750.00
M³
KODE
SNI-DT 91-0006-
2007. 15b
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
18,750.00
SUB TOTAL
( Rp )
96,000.00
SUB TOTAL
( Rp )
-
114,750.00
M³
KODE
A. 3.2.1.14
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
11,250.00
SUB TOTAL
( Rp )
75,000.00
SUB TOTAL
( Rp )
-
86,250.00
M³
53,750.00 M³
65,250.00 M³
71,600.00 M³
108,000.00 M³
108,000.00 M³
108,000.00 M³
108,000.00 M³
17,916.67 M³
21,750.00 M³
23,843.33 M³
36,000.00 M³
37,500.00 M³
177,500.00 M³
150750 M³
96750 M³
114,750.00 M³
86,250.00 M³
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
24 Memasang Pondasi 1Pc : 3Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 737,280.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 682,295.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
26 Memasang Pondasi Batu Kali 1Pc : 5Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 644,195.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
2 Batu Kali Belah 1.200 M3 130,000.00 156,000.00
### PC. Merk Tiga Roda (50 Kg) 2.340 Zak 77,000.00 180,180.00
### Pasir Pasang 0.561 M3 145,000.00 81,345.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 617,400.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
28 Memasang Pondasi Batu Kosong
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 316,095.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
2 Batu Kali Belah 0.450 M3 130,000.00 58,500.00
### PC. Merk Tiga Roda (50 Kg) 3.880 Zak 77,000.00 298,760.00
### Pasir Beton 0.312 M3 175,000.00 54,600.00
### Kerikil Pecah 2 - 3 cm (MSC) 0.468 M3 255,000.00 119,340.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 802,350.00 Per
KODE
A. 3.2.1.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
199,875.00
SUB TOTAL
( Rp )
537,405.00
SUB TOTAL
( Rp )
-
737,280.00
M³
KODE
A. 3.2.1.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
199,875.00
SUB TOTAL
( Rp )
482,420.00
SUB TOTAL
( Rp )
-
682,295.00
M³
KODE
A. 3.2.1.3
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
199,875.00
SUB TOTAL
( Rp )
444,320.00
SUB TOTAL
( Rp )
-
644,195.00
M³
KODE
A. 3.2.1.4
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
199,875.00
SUB TOTAL
( Rp )
417,525.00
SUB TOTAL
( Rp )
-
617,400.00
M³
KODE
A. 3.2.1.9
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
103,935.00
SUB TOTAL
( Rp )
212,160.00
SUB TOTAL
( Rp )
-
316,095.00
M³
KODE
A. 3.2.1.11
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
271,150.00
SUB TOTAL
( Rp )
531,200.00
SUB TOTAL
( Rp )
-
802,350.00
M³
737,280.00 M³
4.04
682,295.00 M³
3.26
644,195.00 M³
2.72
617,400.00 M³
2.34
316,095.00 M³
802,350.00 M³
3.88
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
30 Membuat Beton Mutu ( K.100)
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 4.9400 Zak 77,000.00 380,380.00
21 Pasir Beton 0.4697 M3 175,000.00 82,202.70
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6055 M3 255,000.00 154,390.91
40 Air 215.00 Liter 30.00 6,450.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 776,543.61 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 5.5200 Zak 77,000.00 425,040.00
21 Pasir Beton 0.4476 M3 175,000.00 78,330.00
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6130 M3 255,000.00 156,315.00
40 Air 215.00 Liter 30.00 6,450.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 819,255.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
32 Membuat Beton Lantai Kerja Mutu ( K.100)
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 4.6000 Zak 77,000.00 354,200.00
21 Pasir Beton 0.4827 M3 175,000.00 84,472.50
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6224 M3 255,000.00 158,712.00
40 Air 200.00 Liter 30.00 6,000.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 714,684.50 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 6.5200 Zak 77,000.00 502,040.00
21 Pasir Beton 0.4108 M3 175,000.00 71,890.00
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6236 M3 255,000.00 159,018.00
40 Air 215.00 Liter 30.00 6,450.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 892,518.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
34 Membuat Beton Mutu ( K.225)
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 7.4200 Zak 77,000.00 571,340.00
21 Pasir Beton 0.3773 M3 175,000.00 66,027.50
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6345 M3 255,000.00 161,797.50
40 Air 215.00 Liter 30.00 6,450.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 958,735.00 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 7.6800 Zak 77,000.00 591,360.00
21 Pasir Beton 0.3741 M3 175,000.00 65,467.50
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6297 M3 255,000.00 160,573.50
40 Air 215.00 Liter 30.00 6,450.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 976,971.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
36 Membuat Beton Mutu ( K.275)
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 8.1200 Zak 77,000.00 625,240.00
21 Pasir Beton 0.3697 M3 175,000.00 64,697.50
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6218 M3 255,000.00 158,559.00
40 Air 215.00 Liter 30.00 6,450.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) ### Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
### Besi Beton Polos 1.0500 Kg 12,500.00 13,125.00
### Kawat Ikat Beton 0.0150 Kg 25,000.00 375.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Kg HARGA SATUAN ( Rp ) 14,860.50 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
38 Memasang Begisting Untuk Pondasi
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 200,290.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0450 M3 3,000,000.00 135,000.00
### Paku Panjang 7 - 12 cm 0.3000 Kg 21,000.00 6,300.00
### Teak Oil 0.1000 Liter 47,000.00 4,700.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 215,290.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
40 Memasang Begisting Untuk Kolom
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0400 M3 3,000,000.00 120,000.00
### Paku Panjang 7 - 12 cm 0.4000 Kg 21,000.00 8,400.00
### Teak Oil 0.2000 Liter 47,000.00 9,400.00
85 Balok Kayu Kls II 0.0150 M3 4,500,000.00 67,500.00
### Tripleks 120 x 240 x 9 mm 0.3500 Lembar 125,000.00 43,750.00
93 Dolken/Perancah Diameter 10 2.0000 Batang 40,000.00 80,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 416,995.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0400 M3 3,000,000.00 120,000.00
### Paku Panjang 7 - 12 cm 0.4000 Kg 21,000.00 8,400.00
### Teak Oil 0.2000 Liter 47,000.00 9,400.00
85 Balok Kayu Kls II 0.0180 M3 4,500,000.00 81,000.00
### Tripleks 120 x 240 x 9 mm 0.3500 Lembar 125,000.00 43,750.00
93 Dolken/Perancah Diameter 10 2.0000 Batang 40,000.00 80,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 430,495.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
42 Memasang Begisting Untuk Lantai
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0400 M3 3,000,000.00 120,000.00
### Paku Panjang 7 - 12 cm 0.4000 Kg 21,000.00 8,400.00
### Teak Oil 0.2000 Liter 47,000.00 9,400.00
85 Balok Kayu Kls II 0.0150 M3 4,500,000.00 67,500.00
### Tripleks 120 x 240 x 9 mm 0.3500 Lembar 125,000.00 43,750.00
93 Dolken/Perancah Diameter 10 6.0000 Batang 40,000.00 240,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 576,995.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0300 M3 3,000,000.00 90,000.00
### Paku Panjang 7 - 12 cm 0.4000 Kg 21,000.00 8,400.00
### Teak Oil 0.2000 Liter 47,000.00 9,400.00
85 Balok Kayu Kls II 0.0200 M3 4,500,000.00 90,000.00
### Tripleks 120 x 240 x 9 mm 0.3500 Lembar 125,000.00 43,750.00
93 Dolken/Perancah Diameter 10 3.0000 Batang 40,000.00 120,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 449,495.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
44 Memasang Begisting Untuk Tangga
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0300 M3 3,000,000.00 90,000.00
### Paku Panjang 7 - 12 cm 0.4000 Kg 21,000.00 8,400.00
### Teak Oil 0.1500 Liter 47,000.00 7,050.00
85 Balok Kayu Kls II 0.0150 M3 4,500,000.00 67,500.00
### Tripleks 120 x 240 x 9 mm 0.3500 Lembar 125,000.00 43,750.00
93 Dolken/Perancah Diameter 10 2.0000 Batang 40,000.00 80,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 384,645.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 128,775.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
46 Membuat Kolom Praktis Beton Bertulang (11 x 11) cm
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0020 M3 3,000,000.00 6,000.00
### Paku Panjang 7 - 12 cm 0.0100 Kg 21,000.00 210.00
### Besi Beton Polos 3.0000 Kg 12,500.00 37,500.00
### Kawat Ikat Beton 0.4500 Kg 25,000.00 11,250.00
33 PC. Merk Tiga Roda (50 Kg) 0.0800 Zak 77,000.00 6,160.00
21 Pasir Beton 0.0060 M3 175,000.00 1,050.00
15 Kerikil Pecah 2 - 3 cm (MSC) 0.0090 M3 255,000.00 2,295.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 84,805.00 Per
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 103,120.00 Per
KODE
A. 4.1.1.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
153,120.00
SUB TOTAL
( Rp )
623,423.61
SUB TOTAL
( Rp )
-
776,543.61
M³
KODE
A. 4.1.1.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
153,120.00
SUB TOTAL
( Rp )
666,135.00
SUB TOTAL
( Rp )
-
819,255.00
M³
KODE
A. 4.1.1.4
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
111,300.00
SUB TOTAL
( Rp )
603,384.50
SUB TOTAL
( Rp )
-
714,684.50
M³
KODE
A. 4.1.1.5
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
153,120.00
SUB TOTAL
( Rp )
739,398.00
SUB TOTAL
( Rp )
-
892,518.00
M³
KODE
A. 4.1.1.7
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
153,120.00
SUB TOTAL
( Rp )
805,615.00
SUB TOTAL
( Rp )
-
958,735.00
M³
KODE
A. 4.1.1.8
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
153,120.00
SUB TOTAL
( Rp )
823,851.00
SUB TOTAL
( Rp )
-
976,971.00
M³
KODE
A 4.1.1.9
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
153,120.00
SUB TOTAL
( Rp )
854,946.50
SUB TOTAL
( Rp )
-
1,008,066.50
M³
KODE
A. 4.1.1.17
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
1,360.50
SUB TOTAL
( Rp )
13,500.00
SUB TOTAL
( Rp )
-
14,860.50
Kg
KODE
A. 4.1.1.20
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
69,290.00
SUB TOTAL
( Rp )
131,000.00
SUB TOTAL
( Rp )
-
200,290.00
M²
KODE
A. 4.1.1.21
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
69,290.00
SUB TOTAL
( Rp )
146,000.00
SUB TOTAL
( Rp )
-
215,290.00
M²
KODE
A. 4.1.1.22
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
87,945.00
SUB TOTAL
( Rp )
329,050.00
SUB TOTAL
( Rp )
-
416,995.00
M²
KODE
A. 4.1.1.23
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
87,945.00
SUB TOTAL
( Rp )
342,550.00
SUB TOTAL
( Rp )
-
430,495.00
M²
KODE
A. 4.1.1.24
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
87,945.00
SUB TOTAL
( Rp )
489,050.00
SUB TOTAL
( Rp )
-
576,995.00
M²
KODE
A. 4.1.1.25
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
87,945.00
SUB TOTAL
( Rp )
361,550.00
SUB TOTAL
( Rp )
-
449,495.00
M²
KODE
A. 4.1.1.26
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
87,945.00
SUB TOTAL
( Rp )
296,700.00
SUB TOTAL
( Rp )
-
384,645.00
M²
KODE
A. 4.1.1.27
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
16,975.00
SUB TOTAL
( Rp )
111,800.00
SUB TOTAL
( Rp )
-
128,775.00
M²
KODE
A. 4.1.1.35
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
20,340.00
SUB TOTAL
( Rp )
64,465.00
SUB TOTAL
( Rp )
-
84,805.00
M'
KODE
A. 4.1.1.36
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
33,580.00
SUB TOTAL
( Rp )
69,540.00
SUB TOTAL
( Rp )
-
103,120.00
M'
776,543.61 M³
4.940
819,255.00 M³
5.520
714,684.50 M³
4.600
0.893
0.999
892,518.00 M³
6.52
958,735.00 M³
7.42
976,971.00 M³
7.680
1,008,066.50 M³
8.12
14,860.50 Kg
200,290.00 M²
215,290.00 M²
416,995.00 M²
430,495.00 M²
576,995.00 M²
449,495.00 M²
384,645.00 M²
128,775.00 M²
84,805.00 M'
0.08
0.08
103,120.00 M'
0.11
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
48 Memasang Baja Profil
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 Kg HARGA SATUAN ( Rp ) 136,210.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
594 Besi Baja IWF 1.150 Kg 19,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 Kg HARGA SATUAN ( Rp ) 136,900.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
50 Mengerjakan 100 Kg Perakitan Baja
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
358 Solar Untuk Industri 1.000 Liter 16,800.00
350 Flux Oil 0.100 Liter 30,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 Kg HARGA SATUAN ( Rp ) 38,165.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) ###
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
52 Mengelas 10 cm Dengan Las Listrik
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 10 Cm² HARGA SATUAN ( Rp ) 2,774.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
602 Pintu Gulung Besi(Rolling Do 1.000 m2 570,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 800,100.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
54 Memasang Pintu Folding Door
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
603 Pintu Lipat (Folding door) 1.000 m2 1,000,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) ###
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
606 Profil alumunium 1.100 M 60,000.00
607 Skrup Fixer 2.0000 Biji 250.00
608 Sealant 0.0600 Tube 35,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M' HARGA SATUAN ( Rp ) 76,939.50
ANALISA BIAYA PEKERJAAN KODE
Memasang Baja Profil
A. 4.2.1.1
42,000.00
66,000.00
6,900.00
150.00
21,160.00
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 136,210.00
Per Kg
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 136,900.00
Per Kg
ANALISA BIAYA PEKERJAAN KODE
Mengerjakan 100 Kg Perakitan Baja
A. 4.2.1.3
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 38,165.00
Per Kg
###
###
1,650.00
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 2,993,825.00
Per M²
ANALISA BIAYA PEKERJAAN KODE
Mengelas 10 cm Dengan Las Listrik
A. 4.2.1.5
13,200.00
5,040.00
1,200.00
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 27,740.00
Per Cm²
84,000.00
132,000.00
13,800.00
300.00
Per M²
ANALISA BIAYA PEKERJAAN KODE
Memasang Pintu Folding Door
A. 4.2.1.8
30,800.00
48,400.00
5,060.00
1,100.00
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 1,085,360.00
Per M²
Per M'
136,210.00 Kg
0.87
136,900.00 Kg
0.659
38,165.00 Kg
0.444
### M²
0.379
2,774.00 Cm²
0.2874
800,100.00 M²
0.1936
### M²
0.28
76,939.50 M'
0.22
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
56 Pasangan Bata Merah Tebal 1 Bata, 1Pc : 2Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 258,390.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
28 Batu Bata Kls I 140.000 Buah 800.00 ###
33 PC. Merk Tiga Roda (50 Kg) 0.6590 Zak 77,000.00 50,743.00
22 Pasir Pasang 0.0910 M3 145,000.00 13,195.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 243,738.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
58 Pasangan Bata Merah Tebal 1 Bata, 1Pc : 5Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
28 Batu Bata Kls I 140.000 Buah 800.00 ###
33 PC. Merk Tiga Roda (50 Kg) 0.4440 Zak 77,000.00 34,188.00
22 Pasir Pasang 0.1020 M3 145,000.00 14,790.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 228,778.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 124,593.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
60 Pasangan Bata Merah Tebal 1/2 Bata, 1Pc : 3Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 117,799.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
28 Batu Bata Kls I 70.000 Buah 800.00 56,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.1940 Zak 77,000.00 14,938.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 111,363.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
62 Pasangan Dinding Roster / Terawang, 1Pc : 3Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
111 Roster Besar 30.000 Buah 12,000.00 ###
33 PC. Merk Tiga Roda (50 Kg) 0.2800 Zak 77,000.00 21,560.00
22 Pasir Pasang 0.0320 M3 145,000.00 4,640.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 420,100.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
111 Roster Besar 30.000 Buah 12,000.00 ###
33 PC. Merk Tiga Roda (50 Kg) 0.2200 Zak 77,000.00 16,940.00
22 Pasir Pasang 0.0350 M3 145,000.00 5,075.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 416,365.00 Per
KODE
A. 4.4.1.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
67,800.00
SUB TOTAL
( Rp )
190,590.00
SUB TOTAL
( Rp )
-
258,390.00
M²
KODE
A. 4.4.1.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
67,800.00
SUB TOTAL
( Rp )
175,938.00
SUB TOTAL
( Rp )
-
243,738.00
M²
KODE
A. 4.4.1.4
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
67,800.00
SUB TOTAL
( Rp )
160,978.00
SUB TOTAL
( Rp )
-
228,778.00
M²
KODE
A. 4.4.1.7
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
33,900.00
SUB TOTAL
( Rp )
90,693.00
SUB TOTAL
( Rp )
-
124,593.00
M²
KODE
A. 4.4.1.8
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
33,900.00
SUB TOTAL
( Rp )
83,899.00
SUB TOTAL
( Rp )
-
117,799.00
M²
KODE
A. 4.4.1.10
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
33,900.00
SUB TOTAL
( Rp )
77,463.00
SUB TOTAL
( Rp )
-
111,363.00
M²
KODE
A. 4.4.1.22
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
33,900.00
SUB TOTAL
( Rp )
386,200.00
SUB TOTAL
( Rp )
-
420,100.00
M²
KODE
A. 4.4.1.23
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
34,350.00
SUB TOTAL
( Rp )
382,015.00
SUB TOTAL
( Rp )
-
416,365.00
M²
258,390.00 M²
0.87
243,738.00 M²
0.659
228,778.00 M²
0.444
124,593.00 M²
0.379
117,799.00 M²
0.2874
111,363.00 M²
0.1936
420,100.00 M²
0.28
416,365.00 M²
0.22
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
64 Plesteran Dinding Tebal 15 mm 1Pc : 2Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.204 Zak 77,000.00 15,744.96
22 Pasir Pasang 0.020 M3 145,000.00 2,900.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 58,619.96 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.1555 Zak 77,000.00 11,975.04
22 Pasir Pasang 0.0230 M3 145,000.00 3,335.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 55,285.04 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
66 Plesteran Dinding Tebal 15 mm 1Pc : 5Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.104 Zak 77,000.00 8,008.00
22 Pasir Pasang 0.026 M3 145,000.00 3,770.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 51,753.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.273 Zak 77,000.00 20,993.28
22 Pasir Pasang 0.027 M3 145,000.00 3,915.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 78,308.28 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
68 Plesteran Dinding Tebal 20 mm 1Pc : 3Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.2070 Zak 77,000.00 15,939.00
22 Pasir Pasang 0.0310 M3 145,000.00 4,495.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 63,584.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.1380 Zak 77,000.00 10,626.00
22 Pasir Pasang 0.0350 M3 145,000.00 5,075.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 69,101.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
70 Plesteran Skoning 1Pc : 2Ps Lebar 10 cm
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.1380 Zak 77,000.00 10,626.00
22 Pasir Pasang 0.0350 M3 145,000.00 5,075.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 69,101.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.1380 Zak 77,000.00 10,626.00
22 Pasir Pasang 0.0350 M3 145,000.00 5,075.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 69,101.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
72 Plesteran Ciprat, 1Pc : 2Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.0864 Zak 77,000.00 6,652.80
22 Pasir Pasang 0.0060 M3 145,000.00 870.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 41,422.80 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.1268 Zak 77,000.00 9,763.60
22 Pasir Pasang 0.0120 M3 145,000.00 1,740.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 51,478.60 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
74 Memasang Acian
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.0650 Zak 77,000.00 5,005.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 31,655.00 Per
KODE
A. 4.4.2.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
39,975.00
SUB TOTAL
( Rp )
18,644.96
SUB TOTAL
( Rp )
-
58,619.96
M²
KODE
A. 4.4.2.3
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
39,975.00
SUB TOTAL
( Rp )
15,310.04
SUB TOTAL
( Rp )
-
55,285.04
M²
KODE
A. 4.4.2.5
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
39,975.00
SUB TOTAL
( Rp )
11,778.00
SUB TOTAL
( Rp )
-
51,753.00
M²
KODE
A. 4.4.2.13
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
53,400.00
SUB TOTAL
( Rp )
24,908.28
SUB TOTAL
( Rp )
-
78,308.28
M²
KODE
A. 4.4.2.14
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
43,150.00
SUB TOTAL
( Rp )
20,434.00
SUB TOTAL
( Rp )
-
63,584.00
M²
KODE
A. 4.4.2.16
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
53,400.00
SUB TOTAL
( Rp )
15,701.00
SUB TOTAL
( Rp )
-
69,101.00
M²
KODE
A. 4.4.2.20
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
53,400.00
SUB TOTAL
( Rp )
15,701.00
SUB TOTAL
( Rp )
-
69,101.00
M²
KODE
A. 4.4.2.22
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
53,400.00
SUB TOTAL
( Rp )
15,701.00
SUB TOTAL
( Rp )
-
69,101.00
M²
KODE
A. 4.4.2.23
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
33,900.00
SUB TOTAL
( Rp )
7,522.80
SUB TOTAL
( Rp )
-
41,422.80
M²
KODE
A. 4.4.2.26
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
39,975.00
SUB TOTAL
( Rp )
11,503.60
SUB TOTAL
( Rp )
-
51,478.60
M²
KODE
A. 4.4.2.27
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
26,650.00
SUB TOTAL
( Rp )
5,005.00
SUB TOTAL
( Rp )
-
31,655.00
M²
58,619.96 M²
0.20448
55,285.04 M²
0.15552
51,753.00 M²
0.10368
78,308.28 M²
0.27264
63,584.00 M²
0.20736
69,101.00 M²
0.13824
69,101.00 M²
0.13824
69,101.00 M²
0.13824
41,422.80 M²
0.0864
51,478.60 M²
161
0.1268
31,655.00 M²
0.0650
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
75 Memasang Lantai Ubin PC Abu - Abu ( 20 x 20 ) cm
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Tegel Abu-abu 20 x 20 cm 1.0000 M2 45,000.00 45,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.2080 Zak 77,000.00 16,016.00
30 Semen Warna 1.6200 Kg 14,500.00 23,490.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 127,091.00 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Tegel Warna 20 x 20 cm 1.0000 M2 48,500.00 48,500.00
33 PC. Merk Tiga Roda (50 Kg) 0.2080 Zak 77,000.00 16,016.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00
30 Semen Warna 1.6200 Kg 14,500.00 23,490.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 130,591.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
77 Memasang Lantai Ubin Teraso ( 30 x 30 ) cm
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Tegel Traso Klas I 30 x 30 cm 1.0000 M2 52,200.00 52,200.00
33 PC. Merk Tiga Roda (50 Kg) 0.2000 Zak 77,000.00 15,400.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00
30 Semen Warna 1.5000 Kg 14,500.00 21,750.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 130,520.00 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Tegel Keramik Kualitas I 1.0000 M2 95,000.00 95,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.2000 Zak 77,000.00 15,400.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00
30 Semen Warna 1.5000 Kg 14,500.00 21,750.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 231,950.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
79 Memasang Lantai Keramik ( 30 x 30 ) cm Kwalitas II
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 203,450.00 Per
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 251,732.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
81 Memasang Dinding Porselin ( 10 x 20 ) cm Kwalitas II
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Porselin Kualitas II (motif) 1.0000 M2 62,000.00 62,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.1860 Zak 77,000.00 14,322.00
22 Pasir Pasang 0.0180 M3 145,000.00 2,610.00
30 Semen Warna 2.7500 Kg 14,500.00 39,875.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 238,732.00 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Porselin Kualitas I (motif) 1.0000 M2 75,000.00 75,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.1860 Zak 77,000.00 14,322.00
22 Pasir Pasang 0.0180 M3 145,000.00 2,610.00
30 Semen Warna 1.9400 Kg 14,500.00 28,130.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 239,987.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
83 Memasang Dinding Porselin ( 20 x 20 ) cm Kwalitas II
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Porselin Kualitas II (motif) 1.0000 M2 62,000.00 62,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.1860 Zak 77,000.00 14,322.00
22 Pasir Pasang 0.0180 M3 145,000.00 2,610.00
30 Semen Warna 1.9400 Kg 14,500.00 28,130.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 226,987.00 Per
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 236,987.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
85 Memasang Dinding Marmer ( 100 x 100 ) cm Kwalitas I
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Marmer Kualitas I 1.0600 M2 500,000.00 530,000.00
### Paku Panjang 7 - 12 cm 3.0030 Kg 21,000.00 63,063.00
33 PC. Merk Tiga Roda (50 Kg) 0.2490 Zak 77,000.00 19,173.00
22 Pasir Pasang 0.0250 M3 145,000.00 3,625.00
30 Semen Warna 0.6500 Kg 14,500.00 9,425.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 807,936.00 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
3 Batu Kali Keping/Tempel 1.1000 M3 175,000.00 192,500.00
33 PC. Merk Tiga Roda (50 Kg) 0.2350 Zak 77,000.00 18,095.00
22 Pasir Pasang 0.0350 M3 145,000.00 5,075.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 314,020.00 Per
KODE
A. 4.4.3.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
36,060.00
SUB TOTAL
( Rp )
91,031.00
SUB TOTAL
( Rp )
-
127,091.00
M²
KODE
A. 4.4.3.6
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
36,060.00
SUB TOTAL
( Rp )
94,531.00
SUB TOTAL
( Rp )
-
130,591.00
M²
KODE
A. 4.4.3.8
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
34,645.00
SUB TOTAL
( Rp )
95,875.00
SUB TOTAL
( Rp )
-
130,520.00
M²
KODE
A. 4.4.3.35.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
93,275.00
SUB TOTAL
( Rp )
138,675.00
SUB TOTAL
( Rp )
-
231,950.00
M²
KODE
A. 4.4.3.35.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
93,275.00
SUB TOTAL
( Rp )
110,175.00
SUB TOTAL
( Rp )
-
203,450.00
M²
KODE
A. 4.4.3.49.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
119,925.00
SUB TOTAL
( Rp )
131,807.00
SUB TOTAL
( Rp )
-
251,732.00
M²
KODE
A. 4.4.3.49.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
119,925.00
SUB TOTAL
( Rp )
118,807.00
SUB TOTAL
( Rp )
-
238,732.00
M²
KODE
A. 4.4.3.50.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
119,925.00
SUB TOTAL
( Rp )
120,062.00
SUB TOTAL
( Rp )
-
239,987.00
M²
KODE
A. 4.4.3.50.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
119,925.00
SUB TOTAL
( Rp )
107,062.00
SUB TOTAL
( Rp )
-
226,987.00
M²
KODE
A. 4.4.3.54.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
119,925.00
SUB TOTAL
( Rp )
117,062.00
SUB TOTAL
( Rp )
-
236,987.00
M²
KODE
A. 4.4.3.55
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
182,650.00
SUB TOTAL
( Rp )
625,286.00
SUB TOTAL
( Rp )
-
807,936.00
M²
KODE
SNI-DT 91-0012-
2007. 58
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
98,350.00
SUB TOTAL
( Rp )
215,670.00
SUB TOTAL
( Rp )
-
314,020.00
M²
127,091.00 M²
0.208
130,591.00 M²
130,520.00 M²
0.2
231,950.00 M²
203,450.00 M²
251,732.00 M²
0.1860
238,732.00 M²
239,987.00 M²
226,987.00 M²
236,987.00 M²
807,936.00 M²
0.2488
314,020.00 M²
0.235
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
87 Memasang Langit - Langit Tripleks ( 120 x 240 ) cm,
Tebal 3 mm
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :
NTB 52 BIMA 06 SMKN 10 BIMA
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 39,530.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 260,410.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 260,410.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
79 Papan Kayu Kls I 0.0150 M3 ### 105,000.00
### Paku Panjang 1 - 3 cm 0.0100 Kg 21,000.00 210.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 260,410.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
91 Memasang List Langit - Langit Kayu Profil
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 25,685.00 Per
KODE
A. 4.5.2.5
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,400.00
SUB TOTAL
( Rp )
20,130.00
SUB TOTAL
( Rp )
-
39,530.00
M²
KODE
A. 4.5.2.6
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
155,200.00
SUB TOTAL
( Rp )
105,210.00
SUB TOTAL
( Rp )
-
260,410.00
M²
KODE
A. 4.5.2.7
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
155,200.00
SUB TOTAL
( Rp )
105,210.00
SUB TOTAL
( Rp )
-
260,410.00
M²
KODE
A. 4.5.2.8
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
155,200.00
SUB TOTAL
( Rp )
105,210.00
SUB TOTAL
( Rp )
-
260,410.00
M²
KODE
A. 4.5.2.10
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
9,725.00
SUB TOTAL
( Rp )
15,960.00
SUB TOTAL
( Rp )
-
25,685.00
M'
39,530.00 M²
260,410.00 M²
260,410.00 M²
260,410.00 M²
25,685.00 M'
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
92 Memasang Atap Genteng Kodok / Silang
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 62,570.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 84,786.40 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
94 Memasang Atap Asbes Gelombang Besar
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
67 Asbes Gelombang Besar 0.5000 Lembar 50,000.00 25,000.00
### Paku Sumbat 0.1200 Buah 1,700.00 204.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 44,574.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 118,159.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
96 Memasang Atap Asbes Gelombang 1,05 x 2,10 x 4 mm
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 73,775.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 127,885.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
98 Memasang Atap Genteng Beton
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 169,825.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
48 Genteng Metal Roof 1.5625 Lembar 45,000.00 70,312.50
### Paku Panjang 4 - 6 cm 0.0300 Kg 21,000.00 630.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 97,592.50 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
100 Memasang Bubungan Genteng Beton
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 202,389.20 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
46 Sirap 1.100 Buah 4,000.00 4,400.00
### Paku Panjang 4 - 6 cm 0.050 Kg 21,000.00 1,050.00
33 PC. Merk Tiga Roda (50 Kg) 0.004 Zak 77,000.00 332.64
22 Pasir Pasang 0.032 M3 145,000.00 4,640.00
30 Semen Warna 1.000 Kg 14,500.00 14,500.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 78,222.64 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
102 Memasang Atap Seng Gelombang Besar
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 56,410.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 56,410.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
104 Memasang Atap Genteng Pejaten
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 63,820.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
105 Memasang Bubungan Pejaten
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 104,360.00 Per
KODE
A. 4.5.2.2
TANGGAL
#REF!
SUB TOTAL
( Rp )
20,070.00
SUB TOTAL
( Rp )
42,500.00
SUB TOTAL
( Rp )
-
62,570.00
M²
KODE
A. 4.5.2.5
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
52,400.00
SUB TOTAL
( Rp )
32,386.40
SUB TOTAL
( Rp )
-
84,786.40
M'
KODE
SNI-DT 91-0015-
2007. 8
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,370.00
SUB TOTAL
( Rp )
25,204.00
SUB TOTAL
( Rp )
-
44,574.00
M²
KODE
SNI-DT 91-0015-
2007. 11
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
87,955.00
SUB TOTAL
( Rp )
30,204.00
SUB TOTAL
( Rp )
-
118,159.00
M²
KODE
A. 4.5.2.15
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
18,655.00
SUB TOTAL
( Rp )
55,120.00
SUB TOTAL
( Rp )
-
73,775.00
M²
KODE
SNI-DT 91-0015-
2007. 22b
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
21,325.00
SUB TOTAL
( Rp )
106,560.00
SUB TOTAL
( Rp )
-
127,885.00
M'
KODE
A. 4.5.2.30
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
21,325.00
SUB TOTAL
( Rp )
148,500.00
SUB TOTAL
( Rp )
-
169,825.00
M'
KODE
A. 4.5.2.32
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
26,650.00
SUB TOTAL
( Rp )
70,942.50
SUB TOTAL
( Rp )
-
97,592.50
M²
KODE
A. 4.5.2.34
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
26,650.00
SUB TOTAL
( Rp )
175,739.20
SUB TOTAL
( Rp )
-
202,389.20
M²
KODE
A. 4.5.2.36
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
53,300.00
SUB TOTAL
( Rp )
24,922.64
SUB TOTAL
( Rp )
-
78,222.64
M'
KODE
A. 4.5.2.38
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
15,990.00
SUB TOTAL
( Rp )
40,420.00
SUB TOTAL
( Rp )
-
56,410.00
M²
KODE
A. 4.5.2.39
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
15,990.00
SUB TOTAL
( Rp )
40,420.00
SUB TOTAL
( Rp )
-
56,410.00
M²
KODE
SNI-DT 91-0015-
2007. 39
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
20,070.00
SUB TOTAL
( Rp )
43,750.00
SUB TOTAL
( Rp )
-
63,820.00
M²
KODE
SNI-DT 91-0015-
2007. 40
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
52,400.00
SUB TOTAL
( Rp )
51,960.00
SUB TOTAL
( Rp )
-
104,360.00
M'
62,570.00 M²
84,786.40 M'
44,574.00 M²
118,159.00 M²
73,775.00 M²
127,885.00 M'
169,825.00 M'
97,592.50 M²
1.5625
0.0300
202,389.20 M²
78,222.64 M'
`
56,410.00 M²
56,410.00 M²
63,820.00 M²
104,360.00 M'
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
106 Memasang Kusen Pintu dan Jendela Kayu Klas I
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 1.2000 M3 4,500,000.00 ###
273 Paku Panjang 7 - 12 cm 1.2500 Kg 21,000.00 26,250.00
208 Lem Kayu 1.0000 Kg 30,000.00 30,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
108 Memasang Daun Pintu Panel Kayu Klas I
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
79 Papan Kayu Kls I 0.0400 M3 7,000,000.00 280,000.00
208 Lem Kayu 0.5000 Kg 30,000.00 15,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 732,000.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 652,000.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
110 Memasang Pintu dan Jendela Kaca, Kayu Klas I
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 526,600.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
84 Papan Kayu Kls II 0.0240 M3 5,000,000.00 120,000.00
208 Lem Kayu 0.3000 Kg 30,000.00 9,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 478,600.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
112 Memasang Jalusi Kusen, Kayu Klas I
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
79 Papan Kayu Kls I 0.0600 M3 7,000,000.00 420,000.00
271 Paku Panjang 1 - 3 cm 0.1500 Kg 21,000.00 3,150.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 729,800.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 609,800.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
114 Pasang Teakwood Rangkap, Rangka Expose Kayu Klas I
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
79 Papan Kayu Kls I 0.0250 M3 7,000,000.00 175,000.00
271 Paku Panjang 1 - 3 cm 0.0300 Kg 21,000.00 630.00
208 Lem Kayu 0.3000 Kg 30,000.00 9,000.00
205 Teakwood 120 x 240 x 3 mm 1.0000 Lembar 100,000.00 100,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) 634,230.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
84 Papan Kayu Kls II 0.0250 M3 5,000,000.00 125,000.00
271 Paku Panjang 1 - 3 cm 0.0300 Kg 21,000.00 630.00
208 Lem Kayu 0.3000 Kg 30,000.00 9,000.00
205 Teakwood 120 x 240 x 3 mm 1.0000 Lembar 100,000.00 100,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 584,230.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
116 Memasang Pintu Teakwood Rangkap Lapis Formika, Rangka Expose Kayu
Klas II
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :
NTB 52 BIMA 06 SMKN 10 BIMA
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
79 Papan Kayu Kls I 0.0250 M3 7,000,000.00 175,000.00
271 Paku Panjang 1 - 3 cm 0.0300 Kg 21,000.00 630.00
208 Lem Kayu 0.8000 Kg 30,000.00 24,000.00
205 Teakwood 120 x 240 x 3 mm 1.0000 Lembar 100,000.00 100,000.00
206 Formika Putih 120 x 240 x 2 mm 0.5000 Lembar 110,000.00 55,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 726,105.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
81 Balok Kayu Kls I 1.100 M3 6,500,000.00 ###
279 Besi Beugel/Baut (Kuda-kuda) 15.000 Kg 32,000.00 480,000.00
273 Paku Panjang 7 - 12 cm 5.600 Kg 21,000.00 117,600.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
118
Memasang Konstruksi Kuda - Kuda Konvensional (Btg 6 m'), Kayu Klas II
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
81 Balok Kayu Kls I 1.200 M3 6,500,000.00 ###
279 Besi Beugel/Baut (Kuda-kuda) 15.000 Kg 32,000.00 480,000.00
273 Paku Panjang 7 - 12 cm 5.600 Kg 21,000.00 117,600.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
120 Memasang Konstruksi Kuda - Kuda Expose, Kayu Klas II
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
81 Balok Kayu Kls I 1.100 M3 6,500,000.00 ###
279 Besi Beugel/Baut (Kuda-kuda) 15.000 Kg 32,000.00 480,000.00
273 Paku Panjang 7 - 12 cm 3.000 Kg 21,000.00 63,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
122 Memasang Konstruksi Gording, Kayu Klas II
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 1.100 M3 4,500,000.00 ###
279 Besi Beugel/Baut (Kuda-kuda) 15.000 Kg 32,000.00 480,000.00
273 Paku Panjang 7 - 12 cm 3.000 Kg 21,000.00 63,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 0.0140 M3 4,500,000.00 63,000.00
272 Paku Panjang 4 - 6 cm 0.2500 Kg 21,000.00 5,250.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 87,650.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
124 Memasang Rangka Atap Kodok, Kayu Kls II
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 76,550.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 101,730.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
126 Memasang Rangka Langit - Langit (50 x 100) cm, Kayu Kls II
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 0.0154 M3 4,500,000.00 69,300.00
272 Paku Panjang 4 - 6 cm 0.2000 Kg 21,000.00 4,200.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 124,200.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 0.0163 M3 4,500,000.00 73,350.00
272 Paku Panjang 4 - 6 cm 0.2500 Kg 21,000.00 5,250.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 129,550.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
128 Memasang Lisplank ( 3 x 20 ) cm, Kayu Kls I
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
129 Memasang Lisplank ( 3 x 20 ) cm, Kayu Kls II
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
84 Papan Kayu Kls II 0.0108 M3 5,000,000.00 54,000.00
272 Paku Panjang 4 - 6 cm 0.1000 Kg 21,000.00 2,100.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 87,650.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 109,250.00 Per
`
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
84 Papan Kayu Kls II 0.0110 M3 5,000,000.00 55,000.00
272 Paku Panjang 4 - 6 cm 0.0500 Kg 21,000.00 1,050.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 87,600.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 65,600.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
133 Memasang Rangka Dinding Pemisah (60 x 120) cm, Kayu Kls II
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 0.0280 M3 4,500,000.00 126,000.00
272 Paku Panjang 4 - 6 cm 0.1500 Kg 21,000.00 3,150.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 194,725.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) 256,245.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
135 Memasang Dinding Plywood Rangkap, Rangka Kayu Kls II
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) 241,613.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 479,130.00 Per
KODE
A. 4.6.1.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
3,059,000.00
SUB TOTAL
( Rp )
7,206,250.00
SUB TOTAL
( Rp )
-
10,265,250.00
M³
KODE
A. 4.6.1.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
2,622,000.00
SUB TOTAL
( Rp )
5,456,250.00
SUB TOTAL
( Rp )
-
8,078,250.00
M³
KODE
A. 4.6.1.5.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
437,000.00
SUB TOTAL
( Rp )
295,000.00
SUB TOTAL
( Rp )
-
732,000.00
M²
KODE
A. 4.6.1.5.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
437,000.00
SUB TOTAL
( Rp )
215,000.00
SUB TOTAL
( Rp )
-
652,000.00
M²
KODE
A. 4.6.1.6.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
349,600.00
SUB TOTAL
( Rp )
177,000.00
SUB TOTAL
( Rp )
-
526,600.00
M²
KODE
A. 4.6.1.6.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
349,600.00
SUB TOTAL
( Rp )
129,000.00
SUB TOTAL
( Rp )
-
478,600.00
M²
KODE
A. 4.6.1.10.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
306,650.00
SUB TOTAL
( Rp )
423,150.00
SUB TOTAL
( Rp )
-
729,800.00
M²
KODE
A. 4.6.1.10.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
306,650.00
SUB TOTAL
( Rp )
303,150.00
SUB TOTAL
( Rp )
-
609,800.00
M²
KODE
A. 4.6.1.11.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
349,600.00
SUB TOTAL
( Rp )
284,630.00
SUB TOTAL
( Rp )
-
634,230.00
M³
KODE
A. 4.6.1.11.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
349,600.00
SUB TOTAL
( Rp )
234,630.00
SUB TOTAL
( Rp )
-
584,230.00
M²
KODE
A. 4.6.1.12
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
371,475.00
SUB TOTAL
( Rp )
354,630.00
SUB TOTAL
( Rp )
-
726,105.00
M²
KODE
A. 4.6.1.13.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
1,748,000.00
SUB TOTAL
( Rp )
7,747,600.00
SUB TOTAL
( Rp )
-
9,495,600.00
M³
KODE
A. 4.6.1.13.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
1,748,000.00
SUB TOTAL
( Rp )
5,547,600.00
SUB TOTAL
( Rp )
-
7,295,600.00
M³
KODE
A. 4.6.1.14.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
2,927,900.00
SUB TOTAL
( Rp )
8,397,600.00
SUB TOTAL
( Rp )
-
11,325,500.00
M³
KODE
A. 4.6.1.14.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
2,927,900.00
SUB TOTAL
( Rp )
5,997,600.00
SUB TOTAL
( Rp )
-
8,925,500.00
M³
KODE
A. 4.6.1.15.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
1,048,800.00
SUB TOTAL
( Rp )
7,693,000.00
SUB TOTAL
( Rp )
-
8,741,800.00
M³
KODE
A. 4.6.1.15.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
1,048,800.00
SUB TOTAL
( Rp )
5,493,000.00
SUB TOTAL
( Rp )
-
6,541,800.00
M³
KODE
A. 4.6.1.17
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,400.00
SUB TOTAL
( Rp )
68,250.00
SUB TOTAL
( Rp )
-
87,650.00
M²
KODE
SNI-DT 91-0011-
2007. 18
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,400.00
SUB TOTAL
( Rp )
57,150.00
SUB TOTAL
( Rp )
-
76,550.00
M²
KODE
A. 4.6.1.18
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
23,280.00
SUB TOTAL
( Rp )
78,450.00
SUB TOTAL
( Rp )
-
101,730.00
M²
KODE
A. 4.6.1.19
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
50,700.00
SUB TOTAL
( Rp )
73,500.00
SUB TOTAL
( Rp )
-
124,200.00
M²
KODE
A. 4.6.1.20
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
50,950.00
SUB TOTAL
( Rp )
78,600.00
SUB TOTAL
( Rp )
-
129,550.00
M²
KODE
A. 4.6.1.21.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
13,325.00
SUB TOTAL
( Rp )
2,550,310.00
SUB TOTAL
( Rp )
-
2,563,635.00
M²
KODE
A. 4.6.1.21.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
31,550.00
SUB TOTAL
( Rp )
56,100.00
SUB TOTAL
( Rp )
-
87,650.00
M²
KODE
A. 4.6.1.22.1
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
31,550.00
SUB TOTAL
( Rp )
77,700.00
SUB TOTAL
( Rp )
-
109,250.00
M²
KODE
A. 4.6.1.22.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
31,550.00
SUB TOTAL
( Rp )
56,050.00
SUB TOTAL
( Rp )
-
87,600.00
M²
KODE
A. 4.6.1.22.3
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
31,550.00
SUB TOTAL
( Rp )
34,050.00
SUB TOTAL
( Rp )
-
65,600.00
M²
KODE
A. 4.6.1.23
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
65,575.00
SUB TOTAL
( Rp )
129,150.00
SUB TOTAL
( Rp )
-
194,725.00
M²
KODE
A. 4.6.1.24
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
65,575.00
SUB TOTAL
( Rp )
190,670.00
SUB TOTAL
( Rp )
-
256,245.00
M³
KODE
A. 4.6.1.25
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
13,325.00
SUB TOTAL
( Rp )
228,288.00
SUB TOTAL
( Rp )
-
241,613.00
M³
KODE
SNI-DT 91-0011-
2007. 29
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
286,500.00
SUB TOTAL
( Rp )
192,630.00
SUB TOTAL
( Rp )
-
479,130.00
M²
### M³
8,078,250.00 M³
732,000.00 M²
652,000.00 M²
526,600.00 M²
478,600.00 M²
729,800.00 M²
609,800.00 M²
634,230.00 M³
584,230.00 M²
726,105.00 M²
9,495,600.00 M³
7,295,600.00 M³
### M³
8,925,500.00 M³
8,741,800.00 M³
6,541,800.00 M³
87,650.00 M²
76,550.00 M²
101,730.00 M²
124,200.00 M²
129,550.00 M²
2,563,635.00 M²
87,650.00 M²
109,250.00 M²
87,600.00 M²
65,600.00 M²
194,725.00 M²
256,245.00 M³
241,613.00 M³
479,130.00 M²
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
137 Memasang Kunci Tanam Biasa
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
562 Kunci Pintu 1 Slag KW II 1.0000 Buah 130,000.00 130,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 191,700.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
562 Kunci Pintu 1 Slag KW II 1.0000 Buah 130,000.00 130,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 191,250.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
139 Memasang Kunci Tanam Silinder
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
561 Kunci Pintu 1 Slag KW I 1.0000 Buah 160,000.00 160,000.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 221,250.00 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
573 Engsel H 1.0000 Buah 9,000.00 9,000.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 10 Buah HARGA SATUAN ( Rp ) 2,831.50 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
141 Memasang Engsel Jendela Kupu - Kupu
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 24,875.00 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
573 Engsel H 1.0000 Buah 9,000.00 9,000.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 40,325.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
143 Memasang Kait Angin
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 39,325.00 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
561 Kunci Pintu 1 Slag KW I 1.0000 Buah 160,000.00 160,000.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 185,750.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
145 Memasang Rel Pintu Sorong
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 143,250.00 Per
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
564 Kunci Pintu 2 Slag KW II 1.0000 Buah 110,000.00 110,000.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 142,190.00 Per
KODE
A. 4.6.2.2
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
61,700.00
SUB TOTAL
( Rp )
130,000.00
SUB TOTAL
( Rp )
-
191,700.00
Buah
KODE
A. 4.6.2.3
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
61,250.00
SUB TOTAL
( Rp )
130,000.00
SUB TOTAL
( Rp )
-
191,250.00
Buah
KODE
A. 4.6.2.4
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
61,250.00
SUB TOTAL
( Rp )
160,000.00
SUB TOTAL
( Rp )
-
221,250.00
Buah
KODE
A. 4.6.2.5
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,315.00
SUB TOTAL
( Rp )
9,000.00
SUB TOTAL
( Rp )
-
28,315.00
Buah
KODE
A. 4.6.2.6
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
12,875.00
SUB TOTAL
( Rp )
12,000.00
SUB TOTAL
( Rp )
-
24,875.00
Buah
KODE
A. 4.6.2.7
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
31,325.00
SUB TOTAL
( Rp )
9,000.00
SUB TOTAL
( Rp )
-
40,325.00
Buah
KODE
A. 4.6.2.9
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
31,325.00
SUB TOTAL
( Rp )
8,000.00
SUB TOTAL
( Rp )
-
39,325.00
Buah
KODE
A. 4.6.2.11
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
25,750.00
SUB TOTAL
( Rp )
160,000.00
SUB TOTAL
( Rp )
-
185,750.00
Buah
KODE
A. 4.6.2.14
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
77,250.00
SUB TOTAL
( Rp )
66,000.00
SUB TOTAL
( Rp )
-
143,250.00
Buah
KODE
A. 4.6.2.15
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
32,190.00
SUB TOTAL
( Rp )
110,000.00
SUB TOTAL
( Rp )
-
142,190.00
Buah
191,700.00 Buah
191,250.00 Buah
221,250.00 Buah
2,831.50 Buah
24,875.00 Buah
40,325.00 Buah
39,325.00 Buah
185,750.00 Buah
143,250.00 Buah
142,190.00 Buah
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
147 Memasang Kaca Polos Tebal 3 mm
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 105,115.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 140,315.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
149 Memasang Kaca Riben Tebal 5 mm
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 151,690.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 143,615.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
151 Memasang Kaca Polos 5 mm
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 142,063.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 150,863.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
153 Memasang Kaca Cermin 5 mm
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 142,063.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 351,063.00 Per
KODE
SNI-DT 91-
0017-2007. 17a
TANGGAL
#REF!
SUB TOTAL
( Rp )
19,315.00
SUB TOTAL
( Rp )
85,800.00
SUB TOTAL
( Rp )
-
105,115.00
M²
KODE
SNI-DT 91-
0017-2007. 17b
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,315.00
SUB TOTAL
( Rp )
121,000.00
SUB TOTAL
( Rp )
-
140,315.00
M²
KODE
SNI-DT 91-
0017-2007. 17b
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
21,890.00
SUB TOTAL
( Rp )
129,800.00
SUB TOTAL
( Rp )
-
151,690.00
M²
KODE
A. 4.6.2.16
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,315.00
SUB TOTAL
( Rp )
124,300.00
SUB TOTAL
( Rp )
-
143,615.00
M²
KODE
A. 4.6.2.17
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,312.50
SUB TOTAL
( Rp )
122,750.00
SUB TOTAL
( Rp )
-
142,062.50
M²
KODE
A. 4.6.2.18
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,312.50
SUB TOTAL
( Rp )
131,550.00
SUB TOTAL
( Rp )
-
150,862.50
M²
KODE
A. 4.6.2.20
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,312.50
SUB TOTAL
( Rp )
122,750.00
SUB TOTAL
( Rp )
-
142,062.50
M²
KODE
A. 4.6.2.24
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
19,312.50
SUB TOTAL
( Rp )
331,750.00
SUB TOTAL
( Rp )
-
351,062.50
M²
105,115.00 M²
140,315.00 M²
151,690.00 M²
143,615.00 M²
142,063.00 M²
150,863.00 M²
142,063.00 M²
351,063.00 M²
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
155 Mengerok Permukaan Cat Lama
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
Soda 0.0500 Kg 5,000.00 250.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 10,875.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
218 Plamir Kayu 0.0800 Kg 23,000.00 1,840.00
220 Minyak Cat 0.0200 Liter 23,000.00 460.00
26 Kapur Gamping/Labur 0.0100 Kg 6,000.00 60.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 10,145.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
157 Pengecetan Bidang Kayu Lama
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
218 Plamir Kayu 0.1500 Kg 23,000.00 3,450.00
226 Cat Kayu Mutu Menengah 0.1700 Kg 40,500.00 6,885.00
227 Cat Kayu Mutu Tinggi 0.1700 Kg 50,500.00 8,585.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 33,395.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
225 Meni Kayu 0.2000 Kg 25,000.00 5,000.00
218 Plamir Kayu 0.1500 Kg 23,000.00 3,450.00
226 Cat Kayu Mutu Menengah 0.1700 Kg 40,500.00 6,885.00
227 Cat Kayu Mutu Tinggi 0.2600 Kg 50,500.00 13,130.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 35,185.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
159 Pelaburan Bidang Kayu Dengan Politur
4 Pekerja - 70,000.00 -
16 Tukang Cat 0.0600 115,000.00 6,900.00
17 Kepala Tukang Cat 0.0160 110,000.00 1,760.00
5 Mandor 0.0025 50,000.00 125.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 42,869.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 13,425.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
161 Pengecetan Tembok Baru
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 26,783.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 19,557.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
163 Pengecetan Permukaan Baja dengan Meni Besi
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 29,760.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 32,760.00 Per
KODE
A. 4.7.1.1
TANGGAL
#REF!
SUB TOTAL
( Rp )
10,625.00
SUB TOTAL
( Rp )
250.00
SUB TOTAL
( Rp )
-
10,875.00
M²
KODE
SNI-DT 91-0018-
2007. 6
TANGGAL
#REF!
SUB TOTAL
( Rp )
7,785.00
SUB TOTAL
( Rp )
2,360.00
SUB TOTAL
( Rp )
-
10,145.00
M²
KODE
SNI-DT 91-0018-
2007. 7
TANGGAL
#REF!
SUB TOTAL
( Rp )
14,475.00
SUB TOTAL
( Rp )
18,920.00
SUB TOTAL
( Rp )
-
33,395.00
M²
KODE
A. 4.7.1.4
TANGGAL
#REF!
SUB TOTAL
( Rp )
6,720.00
SUB TOTAL
( Rp )
28,465.00
SUB TOTAL
( Rp )
-
35,185.00
M²
KODE
A. 4.7.1.7
TANGGAL
#REF!
SUB TOTAL
( Rp )
8,785.00
SUB TOTAL
( Rp )
34,084.00
SUB TOTAL
( Rp )
-
42,869.00
M²
KODE
A. 4.7.1.8
TANGGAL
#REF!
SUB TOTAL
( Rp )
7,300.00
SUB TOTAL
( Rp )
6,125.00
SUB TOTAL
( Rp )
-
13,425.00
M²
KODE
A. 4.7.1.10
TANGGAL
#REF!
SUB TOTAL
( Rp )
9,463.00
SUB TOTAL
( Rp )
17,320.00
SUB TOTAL
( Rp )
-
26,783.00
M²
KODE
SNI-DT 91-0018-
2007. 15
TANGGAL
#REF!
SUB TOTAL
( Rp )
7,377.00
SUB TOTAL
( Rp )
12,180.00
SUB TOTAL
( Rp )
-
19,557.00
M²
KODE
A. 4.7.1.16
TANGGAL
#REF!
SUB TOTAL
( Rp )
27,100.00
SUB TOTAL
( Rp )
2,660.00
SUB TOTAL
( Rp )
-
29,760.00
M²
KODE
SNI-DT 91-0018-
2007. 20b
TANGGAL
#REF!
SUB TOTAL
( Rp )
27,100.00
SUB TOTAL
( Rp )
5,660.00
SUB TOTAL
( Rp )
-
32,760.00
M²
10,875.00 M²
10,145.00 M²
33,395.00 M²
35,185.00 M²
42,869.00 M²
13,425.00 M²
26,783.00 M²
19,557.00 M²
29,760.00 M²
32,760.00 M²
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
172 Pasangan Batu Kali 1pc : 5 Ps
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 811,458.80 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
121 Paving Blok Press Type Bata 42.000 Biji 1,900.00 79,800.00
22 Pasir Pasang 0.100 M3 145,000.00 14,500.00
33 PC. Merk Tiga Roda (50 Kg) 0.002 Zak 77,000.00 154.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 154,739.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
174 Pasangan Paving Blok ( Type Tiga berlian )
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
122 Paving Blok Biasa Type Berl 36.0000 Biji 2,700.00 97,200.00
22 Pasir Pasang 0.1000 M3 145,000.00 14,500.00
33 PC. Merk Tiga Roda (50 Kg) 0.0020 Zak 77,000.00 154.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 172,139.00 Per
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 707,280.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
176 Pemasangan Bronjong Kawat Ukuran 4 mm
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 755,280.00 Per
KODE
G. 31hd
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
370,800.00
SUB TOTAL
( Rp )
440,658.80
SUB TOTAL
( Rp )
-
811,458.80
M³
KODE
SP.Xa
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
60,285.00
SUB TOTAL
( Rp )
94,454.00
SUB TOTAL
( Rp )
-
154,739.00
M²
KODE
SP.Xb
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
60,285.00
SUB TOTAL
( Rp )
111,854.00
SUB TOTAL
( Rp )
-
172,139.00
M²
KODE
K. 815 a
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
131,200.00
SUB TOTAL
( Rp )
576,080.00
SUB TOTAL
( Rp )
-
707,280.00
M³
KODE
K. 815 b
TANGGAL
Maret 2015
SUB TOTAL
( Rp )
131,200.00
SUB TOTAL
( Rp )
624,080.00
SUB TOTAL
( Rp )
-
755,280.00
M³
811,458.80 M³
154,739.00 M²
172,139.00 M²
707,280.00 M³
755,280.00 M³
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
177 Memasang Kran Diameter 3/4"
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 50,900.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 16,127.50
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
179 Memasang Pipa Galvanis 1"
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 16,897.50
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 41,360.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
181 Memasang Pipa Galvanis 4"
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
560 Seltip Kecil 2.5000 Satuan 2,500.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 43,445.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 10,652.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
183 Memasang Pipa PVC Diameter 3/4" Type AW
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 10,722.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 11,132.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
185 Memasang Pipa PVC Diameter 2" Type AW
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 16,600.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 24,022.50
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
187 Memasang Pipa PVC Diameter 4" Type AW
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 49,572.50
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 12,330.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
189 Memasang Pipa PVC Diameter 3"
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 13,950.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 41,030.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
191 Memasang Pipa PVC Diameter 6"
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 42,650.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 4,470.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
193 Memasang Pipa HDPE Diameter 4"
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 5,200.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 15,862.50
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
195 Memasang Pipa GIP Diameter 3"
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 38,715.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 40,800.00
PEKERJAAN KODE
Diameter 3/4" 50,900.00 M'
A. 5.1.1.19
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
2,520.00 0.324
6,600.00 0.54
690.00
90.00
UMLAH ( Rp ) 9,900.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
41,000.00
62.50
UMLAH ( Rp ) 41,000.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 50,900.00
Per M'
PEKERJAAN KODE
alvanis 3/4" 16,127.50 M'
A. 5.1.1.20
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
3,780.00
9,900.00
1,035.00
1,350.00
UMLAH ( Rp ) 16,065.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
62.50
UMLAH ( Rp ) 62.50
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 16,127.50
Per M'
PEKERJAAN KODE
Galvanis 1" 16,897.50 M'
A. 5.1.1.21
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
3,780.00
9,900.00
1,035.00
1,350.00
UMLAH ( Rp ) 16,065.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
832.50
UMLAH ( Rp ) 832.50
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 16,897.50
Per M'
PEKERJAAN KODE
Galvanis 3" 41,360.00 M'
A. 5.1.1.23
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
4,165.00
UMLAH ( Rp ) 4,165.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 41,360.00
Per M'
PEKERJAAN KODE
Galvanis 4" 43,445.00 M'
A. 5.1.1.24
UMLAH ( Rp ) 37,195.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
6,250.00
UMLAH ( Rp ) 6,250.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 43,445.00
Per M'
PEKERJAAN KODE
meter 1/2" Type AW 10,652.00 M'
A. 5.1.1.25
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
2,520.00
6,600.00
690.00
100.00
UMLAH ( Rp ) 9,910.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
742.00
UMLAH ( Rp ) 742.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 10,652.00
Per M'
PEKERJAAN KODE
meter 3/4" Type AW 10,722.00 M'
A. 5.1.1.25
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
2,520.00
6,600.00
690.00
100.00
UMLAH ( Rp ) 9,910.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
812.00
UMLAH ( Rp ) 812.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 10,722.00
Per M'
PEKERJAAN KODE
ameter 1" Type AW 11,132.00 M'
A. 5.1.1.26
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
2,520.00
6,600.00
690.00
90.00
UMLAH ( Rp ) 9,900.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
1,232.00
UMLAH ( Rp ) 1,232.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 11,132.00
Per M'
PEKERJAAN KODE
ameter 2" Type AW 16,600.00 M'
A. 5.1.1.29
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
3,780.00
9,900.00
1,035.00
135.00
UMLAH ( Rp ) 14,850.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
1,750.00
UMLAH ( Rp ) 1,750.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 16,600.00
Per M'
PEKERJAAN KODE
ameter 3" Type AW 24,022.50 M'
A. 5.1.1.31
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
5,670.00
14,850.00
1,552.50
200.00
UMLAH ( Rp ) 22,272.50
BIAYA SUB TOTAL
( Rp ) ( Rp )
1,750.00
UMLAH ( Rp ) 1,750.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 24,022.50
Per M'
PEKERJAAN KODE
ameter 4" Type AW 49,572.50 M'
A. 5.1.1.32
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
5,670.00
14,850.00
1,552.50
200.00
UMLAH ( Rp ) 22,272.50
BIAYA SUB TOTAL
( Rp ) ( Rp )
27,300.00
UMLAH ( Rp ) 27,300.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 49,572.50
Per M'
PEKERJAAN KODE
C Diameter 2" 12,330.00 M'
A. 8.4.1.1
DISIAPKAN OLEH : TANGGAL 1.1
SMKN 10 BIMA Maret 2015 0.0384
28.6458
5,670.00
4,510.00
400.00
UMLAH ( Rp ) 10,580.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
1,750.00
UMLAH ( Rp ) 1,750.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 12,330.00
Per M'
PEKERJAAN KODE
C Diameter 3" 13,950.00 M'
A. 8.4.1.2
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
6,580.00
5,170.00
450.00
UMLAH ( Rp ) 12,200.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
1,750.00
UMLAH ( Rp ) 1,750.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 13,950.00
Per M'
PEKERJAAN KODE
C Diameter 4" 41,030.00 M'
A. 8.4.1.3
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
7,350.00
5,830.00
550.00
UMLAH ( Rp ) 13,730.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
27,300.00
UMLAH ( Rp ) 27,300.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 41,030.00
Per M'
PEKERJAAN KODE
C Diameter 6" - M'
A. 8.4.1.4
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
8,260.00
6,490.00
600.00
UMLAH ( Rp ) 15,350.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
27,300.00
UMLAH ( Rp ) 27,300.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 42,650.00
Per M'
PEKERJAAN KODE
PE Diameter 2" 4,470.00 M'
A. 8.4.1.17
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
2,450.00
1,870.00
150.00
UMLAH ( Rp ) 4,470.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 4,470.00
Per M'
PEKERJAAN KODE
PE Diameter 4" 5,200.00 M'
A. 8.4.1.18
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
2,800.00
2,200.00
200.00
UMLAH ( Rp ) 5,200.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 5,200.00
Per M'
PEKERJAAN KODE
P Diameter 1" 15,862.50 M'
A. 8.4.1.34
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
3,780.00
9,900.00
1,350.00
UMLAH ( Rp ) 15,030.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
832.50
UMLAH ( Rp ) 832.50
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 15,862.50
Per M'
PEKERJAAN KODE
P Diameter 3" 38,715.00 M'
A. 8.4.1.35
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
9,450.00
24,750.00
350.00
UMLAH ( Rp ) 34,550.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
4,165.00
UMLAH ( Rp ) 4,165.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 38,715.00
Per M'
PEKERJAAN KODE
P Diameter 4" 40,800.00 M'
A. 8.4.1.36
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
9,450.00
24,750.00
350.00
UMLAH ( Rp ) 34,550.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
6,250.00
UMLAH ( Rp ) 6,250.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 40,800.00
Per M'
0.054
0.09
0
0
0
0
m3
PEMERINTAH KABUPATEN BIMA
DINAS PENDIDIKAN PEMUDA DAN OLAH
SMK NEGERI 10 BIMA
Jalan Lintas Teke Palibelo - Bima Email smkn10_bima@yaho
1 2 3 4
55.b Pasang Daun Pintu dan Jendela Kaca Rangka Aluminium M2 SNI-7393:2008-6.13
DIVISI 4.3 PEKERJAAN DINDING
56 Pasangan Bata Merah Tebal 1 Bata, 1Pc : 2Ps M² A. 4.4.1.1
116 Memasang Pintu Teakwood Rangkap Lapis Formika, Rangka Expose Kayu Klas I M² A. 4.6.1.12
117 Memasang Konstruksi Kuda - Kuda Konvensional (Btg 6 m'), Kayu M³ A. 4.6.1.13.1
118 Memasang Konstruksi Kuda - Kuda Konvensional (Btg 6 m'), Kayu M³ A. 4.6.1.13.2
126 Memasang Rangka Langit - Langit (50 x 100) cm, Kayu Kls II M² A. 4.6.1.19
127 Memasang Rangka Langit - Langit (60 x 60) cm, Kayu II M² A. 4.6.1.20
133 Memasang Rangka Dinding Pemisah (60 x 120) cm, Kayu Kls II M² A. 4.6.1.23
134 Memasang Rangka Dinding Pemisah Teakwood Rangkap, Kayu Kls M³ A. 4.6.1.24
136 Memasang Pintu Tripleks Rangkap, Rangka Kayu Klas II M² SNI-DT 91-0011-2007. 29
160 Pelaburan Bidang Kayu Dengan Cat Residu dan Teer M² A. 4.7.1.8
164 Pengecetan Permukaan Baja dengan Cat Besi M²SNI-DT 91-0018-2007. 20b
169 Memasang Bak Mandi Batu Bata Volume 0,3 m³ Bh SNI-DT 91-0016-2007. 8
- - -
1 Playwood 4 MM Lbr
2 Panel Beton Pracetak etr
3 Kolom Beton Pracetak Btg
4 Strorox Kg 255,000
5 Waterstop m 80,000
6 Minyak Begisting etr 42,000
7 Penjaga Jarak Bekistig/Spacer Bh 45,000
8 Besi Hollow 30-50,3 Kg
9 Phenol Flm 12mm Ltr
10 Dinabolt dia 12mm (10-15cm) Bh 3,000
11 Besi Profil Kg 18,400
12 Besi Baja IWF Kg 19,000
13 Besi siku L 30-30,3 Kg 40,700
14 Besi Plat Baja Kg 45,000
15 Kawat Las Listrik Kg 33,000
16 Besi Stip Baja Kg 18,040
17 Besi Scuare Tube m 6,000
18 Besi Lis kaca(1x1)cm m 260,000
19 Penjelasan cm
20 Pintu Gulung Besi(Rolling Door) m2 570,000
21 Pintu Lipat (Folding door) m2 1,000,000
22 Suns Creen allumunium m2 352,000
23 Rolling door alumunium m2 520,000
24 Profil alumunium m 60,000
25 Skrup Fixer kotak 25,000
26 Sealant Tube 35,000
27 Alumunium Strip m 30,000
28 Pintu alumunium Buah 850,000
29 Venetions blinnds m2 120,000
30 Vertical Blinds ( tirai ) m2 120,000
31 Baja Strip (0,2x2 ) cm Kg 18,040
32 Rangka metal hollow 40 40.2mm m
33 Kapur Padam m3
34 HB - 20 m3 800
35 HB - 15 m3 800
36 HB - 10 m3 800
37 Bata Roster m3
38 Bata Berongga m3
39 Batu Granit bh 11,440
40 Ubin Teralux Marmer bh
41 Plint Ubin Pc bh
42 Plint Ubin Granit bh
43 Plint Ubin Traso bh
44 Plint Ubin Teralux kerang bh 206,000
45 Plint ubin Teralux marmer bh 269,600
46 Interval Cove bh
47 Karpet bh 94,380
48 Underlayer m2 101,640
49 Parguet m2 130,680
50 Porslen bh 1,200
51 Batu paras bh 65,400
52 Batu temple hitam bh 2,500
53 Vynil bh 108,900
54 Wallpaper m
55 Floor Haiderner kg
56 Akuistik lbr
57 Gypsum Board lbr 68,400
58 Profil allum T m
59 Ramset bh
60 Rooflight 90 x 180 ltr
61 Plastic aeratur bh
BAHAN
KET
81.40
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
1 M2 Pasang Rangka Atap Baja Ringan
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 165,850.00
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 546,210.00
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M2 HARGA SATUAN ( Rp ) 272,825.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 118,755.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
1
Paving Block Type Berlian
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :
NTB 52 BIMA 06 SMKN 10 BIMA
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 120,879.50
PEKERJAAN KODE
tap Baja Ringan SNI-DT 91-0014-2007.6
14,000.00
49,500.00
1,150.00
2,500.00
MLAH ( Rp ) 67,150.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
-
14,520.00
36,480.00
27,300.00
2,400.00
18,000.00
MLAH ( Rp ) 98,700.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
MLAH ( Rp ) -
TOTAL (Rp) 165,850.00
Per M²
PEKERJAAN KODE
a Kaca Rangka Aluminium SNI-7393:2008-6.13
5,950.00
9,350.00
1,035.00
250.00
MLAH ( Rp ) 16,585.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
264,000.00
135,000.00
9,625.00
121,000.00
MLAH ( Rp ) 529,625.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
MLAH ( Rp ) -
TOTAL (Rp) 546,210.00
Per M²
PEKERJAAN KODE
sum Rangka Hallow SNI-DT 91-0013-2007.10
10,500.00
27,500.00
2,875.00
3,750.00
MLAH ( Rp ) 44,625.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
112,500.00
27,300.00
20,000.00
68,400.00
MLAH ( Rp ) 228,200.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
MLAH ( Rp ) -
TOTAL (Rp) 272,825.00
Per M2
PEKERJAAN KODE
ipleks ( 120 x 240 ) cm,
A. 4.5.2.5.a
angka Kayu
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
10,500.00
27,500.00
2,875.00
3,750.00
UMLAH ( Rp ) 44,625.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
19,500.00
630.00
54,000.00
UMLAH ( Rp ) 74,130.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 118,755.00
Per M²
PEKERJAAN KODE
ype Berlian A. 4.5.2.5.a
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015
1,400.00
6,930.00
724.50
125.00
UMLAH ( Rp ) 9,179.50
BIAYA SUB TOTAL
( Rp ) ( Rp )
14,500.00
97,200.00
UMLAH ( Rp ) 111,700.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
UMLAH ( Rp ) -
TOTAL (Rp) 120,879.50
Per M²
RENCANA ANGGARAN BIAYA
KEGIATAN : Pembangunan Dan Rehabilitasi Ruang Kelas
PEKERJAAN : Rehabilitasi Ruang Kelas SDN DONGGOBOLO
LOKASI : Kecamatan WOHA
SUMBER DANA : APBN
TAHUN ANGGARAN : 2016
1 2 3 4
I. PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan 1.00
2 Pengukuran dan Pemasangan Bowplank 1.00
2 Urugan Kembali M3
Pekerja
Pekerja 0.25 - Orng
Mandor 0.0083333333 - Orng
3 Urugan Tanah M3
Pekerja
Pekerja 0.25 - Orng
Mandor 0.025 - Orng
Bahan
Tanah Urug 1.2 - M3
4 Urugan Sirtu M3
Pekerja
Pekerja 0.25 - Orng
Mandor 0.025 - Orng
Bahan
Sirtu 1.2 - M3
- Pembesian 132.00 Kg
Pekerja
Pekerja 0.007 0.92 Orng
Tukang Besi Beton 0.007 0.92 Orng
Kepala Tukang Besi Beton 0.0007 0.09 Orng
Mandor 0.0004 0.05 Orng
Bahan
Besi Beton Polos 1.05 138.60 Kg
Kawat Ikat Beton 0.015 1.98 Kg
- Beton K175 M3
Pekerja
Pekerja 1.65 0.00 Orng
Tukang Batu 0.275 0.00 Orng
K. Tukang Batu 0.028 0.00 Orng
Mandor 0.083 0.00 Orng
Bahan
PC. Merk Tiga Roda (50 Kg) 6.52 0.00 Zak
Pasir Beton 0.4108 0.00 M3
Kerikil Pecah 2 - 3 cm (MSC) 0.6236 0.00 M3
Air 215 0.00 Ltr
2 Pekerjaan Ring Balok Uk. 11/15 0.48 M1
Pekerja
Pekerja 0.297 0.14 Orng
Tukang Batu 0.033 0.02 Orng
Tukang Kayu 0.033 0.02 Orng
Tukang Besi Beton 0.033 0.02 Orng
Kepala Tukang Batu 0.01 0.00 Orng
Mandor 0.015 0.01 Orng
Bahan
Papan Kayu Kls III 0.003 0.00 M3
Paku Panjang 4 - 6 cm 0.02 0.01 Kg
Besi Beton Polos 3.6 1.73 Kg
Kawat Ikat Beton 0.05 0.02 Kg
PC. Merk Tiga Roda (50 Kg) 0.11 0.05 Zak
Pasir Beton 0.009 0.00 M3
Kerikil Pecah 2 - 3 cm (MSC) 0.015 0.01 M3
- Pembesian Kg
Pekerja
Pekerja 0.007 0.00 Orng
Tukang Besi Beton 0.007 0.00 Orng
Kepala Tukang Besi Beton 0.0007 0.00 Orng
Mandor 0.0004 0.00 Orng
Bahan
Besi Beton Polos 1.05 0.00 Kg
Kawat Ikat Beton 0.015 0.00 Kg
- Beton K175 M3
Pekerja
Pekerja 1.65 0.00 Orng
Tukang Batu 0.275 0.00 Orng
K. Tukang Batu 0.028 0.00 Orng
Mandor 0.083 0.00 Orng
Bahan
PC. Merk Tiga Roda (50 Kg) 6.52 0.00 Zak
Pasir Beton 0.4108 0.00 M3
Kerikil Pecah 2 - 3 cm (MSC) 0.6236 0.00 M3
Air 215 0.00 Ltr
V. PEKERJAAN KUSEN
1 Kusen Pintu dan Jendelah Kayu Klas I 0.88 M3
Pekerja
Pekerja 7 6.16 Orng
Tukang Kayu 21 18.47 Orng
Kepala Tukang Kayu 2.1 1.85 Orng
Mandor 0.35 0.31 Orng
Bahan
Balok Kayu Kls I 1.1 0.97 M3
Paku Panjang 7 - 12 cm 1.25 1.10 Kg
Lem Kayu 1 0.88 Kg
Bahan
Balok Kayu Kls I 1.100 1.80 M3
Besi Beugel/Baut (Kuda-kuda) 15.000 293.80 Kg
Paku Panjang 7 - 12 cm 5.600 10.05 Kg
Pekerja
Bahan
Ls 150,000.00 150,000.00
Ls 300,000.00 300,000.00
450,000.00
A. 2.3.1.1 53,750.00 -
70,000.00 -
50,000.00 -
-
A. 2.3.1.9.1 17,916.67 -
70,000.00 -
50,000.00 -
-
70,000.00 -
50,000.00 -
80,000.00 -
-
A. 3.2.1.15 150,750.00 -
70,000.00 -
50,000.00 -
-
130,000.00 -
-
70,000.00 19,687.50
110,000.00 15,468.75
115,000.00 1,617.19
50,000.00 703.13
130,000.00 29,250.00
77,000.00 39,270.00
145,000.00 14,790.00
120,786.56
A. 3.2.1.9 316,095.00 37,931.40
70,000.00 6,552.00
110,000.00 5,148.00
115,000.00 538.20
50,000.00 234.00
130,000.00 18,720.00
130,000.00 6,739.20
37,931.40
A. 4.4.1.10 111,363.00 13,591,858.07
70,000.00 2,563,050.74
110,000.00 1,342,550.39
115,000.00 140,357.54
50,000.00 91,537.53
-
800.00 6,834,801.97
77,000.00 1,823,183.43
145,000.00 796,376.48
13,591,858.07
70,000.00 7,439,774.31
110,000.00 5,845,536.96
115,000.00 611,124.32
50,000.00 265,706.23
77,000.00 2,837,033.94
145,000.00 1,335,616.63
18,334,792.37
70,000.00 18,375.00
110,000.00 4,812.50
115,000.00 503.13
50,000.00 656.25
-
77,000.00 77,481.25
175,000.00 18,478.36
255,000.00 34,718.25
30.00 1,312.50
156,337.23
A. 4.1.1.21 215,290.00 -
70,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -
3,000,000.00 -
21,000.00 -
47,000.00 -
-
70,000.00 64,680.00
110,000.00 101,640.00
115,000.00 10,626.00
50,000.00 2,640.00
12,500.00 1,732,500.00
25,000.00 49,500.00
1,961,586.00
A. 4.1.1.5 892,518.00 -
70,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -
-
77,000.00 -
175,000.00 -
255,000.00 -
30.00 -
-
A. 4.1.1.36 103,120.00 49,497.60
70,000.00 9,979.20
110,000.00 1,742.40
110,000.00 1,742.40
110,000.00 1,742.40
115,000.00 552.00
50,000.00 360.00
3,000,000.00 4,320.00
21,000.00 201.60
12,500.00 21,600.00
25,000.00 600.00
77,000.00 4,065.60
175,000.00 756.00
255,000.00 1,836.00
49,497.60
A. 4.1.1.21 215,290.00 -
70,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -
3,000,000.00 -
21,000.00 -
47,000.00 -
-
A. 4.1.1.17 14,860.50 -
70,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -
12,500.00 -
25,000.00 -
-
70,000.00 12,705.00
110,000.00 3,327.50
115,000.00 354.20
50,000.00 456.50
77,000.00 55,224.40
175,000.00 7,907.90
255,000.00 17,491.98
30.00 709.50
98,176.98
A. 4.1.1.21 215,290.00 18,837.88
70,000.00 3,185.00
110,000.00 2,502.50
115,000.00 261.63
50,000.00 113.75
3,000,000.00 11,812.50
21,000.00 551.25
47,000.00 411.25
18,837.88
A. 4.1.1.17 14,860.50 2,322,179.00
70,000.00 76,569.95
110,000.00 120,324.20
115,000.00 12,579.35
50,000.00 3,125.30
12,500.00 2,050,980.75
25,000.00 58,599.45
2,322,179.00
A. 4.1.1.5 892,518.00 -
70,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -
77,000.00 -
175,000.00 -
255,000.00 -
30.00 -
-
A. 4.1.1.35 84,805.00 -
70,000.00 -
110,000.00 -
110,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -
3,000,000.00 -
21,000.00 -
12,500.00 -
25,000.00 -
77,000.00 -
175,000.00 -
255,000.00 -
-
70,000.00 430,867.58
110,000.00 2,031,232.90
115,000.00 212,356.17
50,000.00 15,388.13
6,500,000.00 6,287,149.44
21,000.00 23,082.19
30,000.00 26,379.65
9,026,456.05
7,000,000.00 1,792,000.00
30,000.00 96,000.00
4,684,800.00
A. 4.6.1.6.1 526,600.00 5,257,574.40
70,000.00 559,104.00
110,000.00 2,635,776.00
115,000.00 275,558.40
50,000.00 19,968.00
7,000,000.00 1,677,312.00
30,000.00 89,856.00
5,257,574.40
70,000.00 8,080.80
110,000.00 126,984.00
115,000.00 13,275.60
50,000.00 307.84
110,000.00 931,216.00
1,079,864.24
70,000.00 69,730.92
110,000.00 327,096.00
115,000.00 34,196.40
50,000.00 24,903.90
5,000,000.00 446,040.00
21,000.00 4,683.42
906,650.64
70,000.00 2,740,500.00
110,000.00 8,613,000.00
115,000.00 900,450.00
50,000.00 978,750.00
4,500,000.00 18,087,300.00
21,000.00 1,096,200.00
32,416,200.00
70,000.00 1,827,000.00
110,000.00 2,871,000.00
115,000.00 300,150.00
50,000.00 65,250.00
52,000.00 5,089,500.00
21,000.00 164,430.00
10,317,330.00
A. 4.5.2.10 25,685.00 3,339,050.00
70,000.00 455,000.00
110,000.00 715,000.00
115,000.00 74,750.00
50,000.00 19,500.00
15,000.00 2,047,500.00
21,000.00 27,300.00
3,339,050.00
A. 4.4.3.35.2 203,450.00 21,240,180.00
70,000.00 5,115,600.00
110,000.00 4,019,400.00
115,000.00 420,210.00
50,000.00 182,700.00
66,500.00 6,942,600.00
77,000.00 1,607,760.00
145,000.00 681,210.00
14,500.00 2,270,700.00
21,240,180.00
70,000.00 1,672,923.00
110,000.00 2,628,879.00
115,000.00 274,837.35
50,000.00 59,747.25
4,500,000.00 15,056,307.00
21,000.00 1,254,692.25
-
Jumlah 20,947,385.85
70,000.00 1,371,074.88
110,000.00 2,585,455.49
115,000.00 540,595.24
50,000.00 16,322.32
6,500,000.00 11,670,458.80
32,000.00 9,401,656.32
21,000.00 211,145.53
Jumlah 24,425,633.70
70,000.00 274,214.98
110,000.00 3,102,546.59
115,000.00 2,335,371.43
50,000.00 121,845.47
6,500,000.00 11,670,458.80
32,000.00 1,880,331.26
21,000.00 1,776,913.04
Jumlah 21,161,681.57
Total 66,534,701.11
70,000.00 4,993,800.00
110,000.00 3,923,700.00
115,000.00 410,205.00
50,000.00 178,350.00
45,000.00 25,080,468.75
21,000.00 224,721.00
34,811,244.75
70,000.00 179,340.00
110,000.00 419,375.00
115,000.00 45,597.50
50,000.00 6,100.00
35,000.00 1,088,850.00
21,000.00 128,100.00
1,867,362.50
70,000.00 292,600.00
110,000.00 919,600.00
115,000.00 96,140.00
50,000.00 10,450.00
5,000,000.00 2,257,200.00
21,000.00 87,780.00
3,663,770.00
TOTAL
Ls 180,000.00 1,080,000.00
Ls 14,500.00 145,000.00
Ls 12,000.00 192,000.00
Ls 15,000.00 480,000.00
Ls 8,000.00 240,000.00
2,137,000.00
Total
A. 4.7.1.10 26,783.00 22,086,933.06
70,000.00 1,154,527.36
115,000.00 5,974,679.09
110,000.00 571,491.04
50,000.00 103,082.80
-
20,000.00 1,649,324.80
31,000.00 2,556,453.44
47,000.00 10,077,374.53
22,086,933.06
70,000.00 329,813.12
115,000.00 69,664.61
110,000.00 44,423.81
50,000.00 8,413.60
25,000.00 336,544.00
23,000.00 232,215.36
40,500.00 463,421.09
50,500.00 883,764.54
2,368,260.13
70,000.00 365,400.00
115,000.00 1,890,945.00
110,000.00 180,873.00
50,000.00 32,625.00
20,000.00 522,000.00
31,000.00 809,100.00
47,000.00 3,189,420.00
6,990,363.00
Ls 150,000.00 2,400,000.00
Ls 70,000.00 1,120,000.00
Ls 15,000.00 15,000.00
Ls 50,000.00 150,000.00
3,685,000.00
Ls 400,000.00 1,200,000.00
Ls 750,000.00 3,000,000.00
Ls 350,000.00 6,300,000.00
Ls 250,000.00 4,500,000.00
Ls 250,000.00 1,000,000.00
-
-
16,000,000.00
BACK UP DATA
KEGIATAN : Pembangunan Sarana Dan Prasarana
PEKERJAAN : Rehabilitasi Pagar Pacuan Kuda BAGIAN DALAM
LOKASI : Kabupaten Bima
TAHUN ANGGARAN : 2013
I. PEKERJAAN PERSIAPAN
4 Urugan Pasir
Bawah Pondasi Induk
Panjang Urugan = 1 m Vol. = V x T x
Lebar Urugan = 0.0 m
Tinggi Urugan = 0.05 m = 1.00 x 0.0 x
= 0.00
Urugan Pasir
Bawah Pondasi Emperan
Panjang Urugan = 12 m Vol. = V x T x
Lebar Urugan = 0.5 m
Tinggi Urugan = 0.05 m = 12.00 x 0.5 x
= 0.30
Bawah Lantai
Lebar = 0 Vol. = L x P x
Panjang 0
Tinggi Urugan = 0.05 = 0.00 x 0.00 x
= 0.00
= 0.00
3 Pasngan Bata
Panjang = 30 m Vol. = V x T
Tinggi = 3.5 m = 30.00 x 3.5
= 105.00
Pasngan Bata
Panjang = 7 m Vol. = V x T
Tinggi = 2.13 m = 7.00 x 2.13
= 14.91
Kurang Kusen PJ
Lebar = 0.92 m Vol. = L x T x
Tinggi = 2.52 m = 0.92 x 2.52 x
Jumlah = 1 = 2.32
Kurang Kusen PJ
Lebar = 1.47 m Vol. = L x T x
Tinggi = 1 m = 1.47 x 1 x
Jumlah = 1 = 1.47
Kurang JV
Lebar = 2 m Vol. = L x T x
Tinggi = 1 m = 2.00 x 1 x
Jumlah = 5 = 10.00
Kuran V Gewel
Lebar = 0.71 m Vol. = L x T x
Tinggi = 1.07 m = 0.71 x 1.07 x
Jumlah = 4 = 3.04
- Pembesian
Besi induk @ 12 mm = 120.50 m' Vol. = Bj. 12 Besi
x induk @ 12 mm
= 0.87 x 120.50
= 104.35
- Beton K175
Panjang = 1.00 m Vol. = P x L x
Lebar = 0.2 m = 1.00 x 0.20 x
Tinggi = 0.15 m = 0.03
- Beton K175
Panjang = 0.15 m Vol. = P x L x
Lebar = 0.2 m = 0.15 x 0.20 x
Tinggi = 3.5 m = 1.05
Jumlah = 10 m
- Pembesian
Berat Besi = 38.60 Kg Vol. = Bj. 12 x Berat Besi
= 0.87 x 38.60
= 33.43
- Pembesian
Berat Besi = 38.55 m' Vol. = Bj. 6 x Berat Besi
= 0.22 x 38.55
= 8.56
- Beton K175
Panjang = 0.20 m Vol. = P x L x
Lebar = 0.2 m = 0.20 x 0.20 x
Tinggi = 2.4 m = 0.38
Jumlah = 4 m
- Pembesian
Berat Besi = 120.50 Kg Vol. = Bj.12 x Berat Besi
= 0.87 x 120.50
= 104.35
Cincin @ 6 mm = 70.00 m' Vol. = Bj. 6 x Cincin @ 6 mm
= 0.22 x 70.00
= 15.54
- Beton K175
Panjang = 8.00 m Vol. = P x L x
Lebar = 0.11 m = 8.00 x 0.11 x
Tinggi = 0.15 m = 0.13
Jumlah = 1 m
7 Beton Gewel
- Panjang
Panjang Total = 10.77 m Vol. = P 2.00
= 10.77 x 2.00
= 21.54
V. PEKERJAAN KKUSEN
1 Kusen Kayu Klas I ( Jati) Panjang Keseluruhan Kusen =
Panjang Jumlah
JV = 10 x 5 = 50 m' = T x L x
PV = 6.88 x 1 = 6.88 m' = 0.06 x 0.12 x
JV = 6.41 x 1 = 6.41 m' = 0.55
V.Gewel = 3.26 x 4 = 13.04 m'
76.33
Lebar = 0.65 = L x T x
Tinggi = 0.8 = 0.65 x 0.80 x
Jumlah = 12 = 6.24
Lebar = 0.65 = L x T x
Tinggi = 0.8 = 0.65 x 0.80 x
Jumlah = 10 = 5.20
5 Memasang Krepeye
Lebar = 12.39 = L x T x
Tinggi = 0.15 = 12.39 x 0.15 x
Jumlah = 1 = 1.86
2 List Plafond
Panjang List Plafond = 120 m' 29.00 2.00 +
58.00 +
130.00
VII. PEKERJAAN LANTAI
1 Pemasangan Keramik 30 x 30 cm
Panjang = 29 = P x L x
Lebar = 9 = 29.00 x 9.00 x
Jumlah = 1 = 261.00
Panjang = 14 v = P x L x
Vol.Kayu 6/14 = 0.02 = 14.00 x 0.02 x
Jumlah = 2 = 0.56
Gording danNok
Panjang = 261 v = P x L x
Vol.Kayu 6/14 = 0.014 = 261.00 x 0.01 x
Jumlah = = 3.65
Memasang Total
MEGETAHUI DI SETUJUI
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS
( PPK ) CV. ANDESA Consultant
TAUFIQURRAHMAN, ST JIHADUDDIN, ST
NIP. 19770921 200501 1 004 Pengawas Lapangan
pondasipondasiluas lantai
14 4
16 8
30 12
RHITUNGAN VOLUME 4
3 4 30.5
1
- 2
- 6
1.00 - 1
- 3
1.00 - 10.5
- 10.5
- 5.5
- 4
- 6.5
T - 10.5
0.00 - 6.5
- 6 8.82
0.00 m3 - 12 0.03
- 17.5 294
T - 12
0.00 - 5
0.00 m3
Total Galian 0.00 m3
- 5
0.00 m 3
- 3
- 1.5
- 4.5
T 0.00 m3
0.00
- 4
T - 9
- 12.5
0.05 0.00 m3 - 16
- 4.5
T
0.05 0.30 m3
Total Urugan Pas 0.30 m3
- 274
T
0.05 0.00 m3
-
-
-
Lb x T -
-
0.5 x 0.5 0.19 m3 -
-
0.38 x 0.5 -
-
1.3125
81
Lb x T
0.33 x 0.346
T
0.2 0.12 m3
1100
T 1250
0.2 0.00 m3
Total Pas. Koso 0.12 m3
150
1200
105.00
64
14.91
14.91 7.46
119.91
9,600.00
Jumlah 2.32
1 336,000.00
1 0.92 1
Jumlah
1
1.47
2 2.52 1.47
Jumlah
5
10.00
14.91
Jumlah
4
3.04 120
103.08
81.40
206.17 m2 824.6624
T 0.08 M2
2.00
T. Pokok Cincin
104.35 Kgf 120 200
10 114
25.37 Kgf
129.73 kg
0.5
T 0.03 M3
0.15
T 0.0875 M2
2.00
148 24.667
128.77 Kgf 246.67
0.5
123.33
27.49 Kgf
156.27 Kg
T x Jumlah 1.05 M3
3.50 x 10.00
T 1.536 M2
4.00
81
38.4 16.00
33.43 Kgf 64
38.4
8.56 Kgf
41.99 Kg
T x a 0.38 M3
2.40 x 4.00
T 0.48 M2
1.00 ,
,
15.54 Kgf
119.89 kg
T x a 0.13 M3
0.15 x 1.00
21.54 m' dak 1 dak 2 dak 3 dak 4 dak 5
DISETUJUI
KONTRAKTOR PELAKSANA
CV. DUNIA ADAM
LASKAR NUSANTARA
Direktur
luas lantai
dak 5
83.6
REKAPITULASI ANGGARAN BIAYA
KEGIATAN : Pembangunan Dan Rehabilitasi Ruang Kelas
PEKERJAAN : Rehabilitasi Ruang Kelas SDN DONGGOBOLO
LOKASI : Kecamatan WOHA
SUMBER DANA : APBN
TAHUN ANGGARAN : 2016
I. PEKERJAAN PERSIAPAN
V. PEKERJAAN KAYU
X. PEKERJAAN PENGECATAN
A. REAL COST
B. KONSULTAN PERENCANA DAN PENGAWAS 4 %
D. PPN 10%
JUMLAH ( C + D )
DIBULATKAN
Tiga Ratus Dua Puluh Lima Juta Lima Ratus Tiga Puluh Du
TERBILANG :
Rupiah
Mengetahui
Kepala Dinas Pendidikan, Pemuda dan Olahraga
Kabupaten Bima
TAJUDDIN, SH, M. Si
NIP. 19681231 199303 1 120
RAN BIAYA
JUMLAH HARGA
Rp 450,000.00
Rp -
Rp 32,085,368.40
Rp 4,606,614.69
Rp 20,955,345.33
Rp 46,072,580.00
Rp 21,240,180.00
Rp 106,877,078.36
Rp 2,137,000.00
Rp 31,445,556.19
Rp 3,685,000.00
Rp 16,000,000.00
Rp 285,554,722.98
Rp 11,422,188.92
Rp 28,555,472.30
Rp 325,532,384.20
Rp 325,532,000.00
Konsultan Perencana
SMKN 10 BIMA
JOHAN KURNIAWAN , ST
NIP. 19730615 201406 1 003
getahui
an, Pemuda dan Olahraga
aten Bima
N, SH, M. Si
31 199303 1 120
tiga ratus dua puluh
325,532,000.00
PEMERINTAH KABUPATEN BIMA
DINAS PENDIDIKAN PEMUDA DAN OLAHRAGA
SMK NEGERI 10 BIMA
Jalan Lintas Teke Palibelo Bima . Email smkn10_bima@yahoo. Co.id
I PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan 150,000.000 0.053 0.053
2 Pengukuran dan Pemasangan Bowplank 300,000.000 0.105 0.105
450,000.000
II PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Biasa - - -
2 Urugan Kembali - - -
3 Urugan Tanah - - -
4 Urugan Sirtu - - -
100
90
90
80
70
60
-
50
11.358
1.170
4.465
40
1.284
30
20
20
10
13.812 4.465 - - -
58.273 62.739 62.739 62.739 62.739
Oktober 2016
dan Pengawas,
N 10 Bima
niawan, ST
15 201406 1 003
W CV. WAJAR
ompleks Pasar Tente Desa Tent
METHODE PELAKSANAAN
I. UMUM
1.1. Lingkup Pekerjaan
Sesuai yang tertuang dalam Dokumen Lelang, hasil Aanwijing dan Risalah ka
menyimpulkan bahwa pekerjaan terdiri dari :
a. Pekerjaan pendahuluan
Pekerjaan pendahuluan meliputi pekerjaan : Pekerjaan persiapan/pembuatan Dire
Keet, Pematokan dan Pengukuran, pembongkaran atap bangunan lama, pho
dokumentasi proyek 0%, pemberitahuan instansi terkait, mobilisasi personil d
peralatan, penyiapan rencana kerja dan jaminan mutu serta penyiapan Gambar Ke
(Shoop Drawing).
1.4 Material
a. Urugan Tanah
Berdasarkan gambar pelelangan dan dokumen lelang didefinisikan bahwa Urugan Tan
yang dipergunakan adalah Urugan Tanah biasa hasil galian yang diperoleh pada seki
lokasi kegiatan dan urugan tanah untuk peninngi bangunan.
Berdasarkan gambar pelelangan dan dokumen lelang didefinisikan bahwa Urugan Tan
yang dipergunakan adalah Urugan Tanah biasa hasil galian yang diperoleh pada seki
lokasi kegiatan dan urugan tanah untuk peninngi bangunan.
c. Semen
Berdasarkan spesifikasi teknik dan dokumen lelang didefinisikan bahwa semen PC ya
dipergunakan adalah semen PC yang memenuhi Standar Nasional Indonesia (SNI) N.I
atau sesuai dengan persetujuan direksi teknik dan diperoleh di toko/distribu
terdekat.
d. Besi
Berdasarkan spesifikasi teknik dan dokumen lelang didefinisikan bahwa Besi ya
dipergunakan adalah Besi Polos yang memenuhi Standar Nasional Indonesia (SNI) N.I
atau sesuai dengan persetujuan direksi teknik dan diperoleh di toko/distribu
terdekat.
e. Batu Bata
Berdasarkan spesifikasi teknik dan dokumen lelang didefinisikan bahwa Batu bata ya
berukuran 6 x 12 x 24 Cm yang dipergunakan adalah Bata yang memenuhi Stand
Nasional Indonesia (SNI) N.I.8. atau sesuai dengan persetujuan direksi teknik d
diperoleh di toko/distributor terdekat.
f. Kayu
Berdasarkan spesifikasi teknik dan dokumen lelang didefinisikan bahan kayu ya
dipakai adalah balok kayu kls I untuk kusen, papan kayu kls I untuk daun pintu, lispla
dan daun jendela. kayu dipakai benar benar berumur dan berkualitas baik atau sesu
dengan persetujuan direksi teknik dan diperoleh di toko/distributor terdekat.
IV PEKERJAAN KUSEN
1. Kusen Pintu dan Jendelah Kayu Klas I
2. Memasang Daun Pintu Panil
3. Err:509
V PEKERJAAN PLAFOND
1. Memasang Langit - Langit Tripleks ( 120 x 240 ) cm, Tebal 3 mm
2. List Plafond
VI PEKERJAAN LANTAI
1. Pasang Lantai Keramik 30 x 30 Cm
2. Err:509
3. Err:509
IX PEKERJAAN PENGECATAN
1. Pengecatan Tembok Baru
2. Pengecatan Plafond
X Err:509
1. Err:509
2. Err:509
3. Err:509
4. Err:509
5. Err:509
6. Err:509
XI PEKERJAAN LISTRIK
1. Titik Lampu
2. Lampu TL 20 Watt
3. Err:509
4. Saklar Engkel
5. Err:509
6. Err:509
7. Stop Kontak Tanam
Penyiapan kantor lapangan dan base camp akan diselesaikan dalam waktu 7 (tujuh) h
terhitung mulai proses penyewaan lokasi base camp sampai dengan siap ditempati.
Sebelum memulai tahapan pekerjaan konstruksi/fisik, akan dibuat Rencana Kerja (Wo
Plan) dan jaminan mutu (Quality Assurance) dan didiskusikan dalam Pre Constructi
Meeting untuk mendapatkan masukan dari Direksi atau instansi terkait untuk persetuju
lebih lanjut. Penyiapan materi ini akan dilaksanakan dalam waktu 3 (tiga) hari kalender.
Materi gambar kerja mengacu pada gambar pelelangan, dan dalam penjabarannya ak
disesuaikan dengan kondisi lapangan atau atas pengarahan Direksi.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki dan tangan akibat terkena palu, linggis dan jepitan kayu bongkara
serta luka kepala akibat tertimpah genteng, kayu dan lbahan ain-lain.
* Pengendalian Resiko K3
- Hati - hati dalam pembongakaran bangunan lama, tidak diperbolekan bercan
pada saat berkerja, memakai kaos tangan kerja, sepatu kerja dan helm ke
untuk menjaga keselaman kerja.
d. Perhitungan Analisa
* Volume Pembongkaran Bangunan Lama : Err:509
PEKERJAAN TANAH
4.2 Galian Tanah
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan melampiri gambar kerja (shoop drawin
yang sudah disetujui.
* Melakukan pemotretan kondisi 0% sebelum memulai pekerjaan.
* Setelah selesai pemasangan bouplank maka diteruskan dengan pengalian pond
bangunan dengan ukuran yang tercantum dalam bestek serta atas petunjuk direk
* Galian tanah dilakukan sesuai kebutuhan konstruksi yaitu untuk pondasi pasang
pondasi batu kali yang tercantum dalam bestek atau sesuai petunjuk direksi.
* Tanah galian dari sisa galian dapat dipakai sebagai bahan urugan kembali d
bahan urugan tanah diatas lantai dan tanah sisa galian yang tidak berguna har
disingkirkan jauh dari lokasi pekerjaan.
* Melakukan pemeriksaan secara bersama-sama dengan direksi atas hasil pekerja
sebelum dilakukan opname pekerjaan, mengambil dokumen pekerjaan sebag
bahan laporan.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki dan tangan akibat terkena tembilang atau scop pada saat pengalia
* Pengendalian Resiko K3
- Hati - hati dalam pelaksanaan galian pondasi, hindari bercanda dalam berker
galian harus dilakukan dua arah yaitu yang mulai dari titik nol dan yang mu
dari titik akhir serta hindari pada saat galian saling membelakangi dan har
berhadapan agar dapat melihat rekan kerja yang gali, memakai sepatu ker
helm kerja dan kaos tangan kerja.
d. Perhitungan Analisa
* Volume galian tanah : -
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki dan tangan akibat terkena scop dan tertimpa peralatan stamp
pada saat stampel pada saat memasukan tanah sisa galian dan pada sa
pemadatan tanah urugkan kembali. keselah kiri maupun kanan pasang
pondasi batu kali.
* Pengendalian Resiko K3
- Hati - hati dalam memasukan tanah sisa galian kedalam selah pondasi, hind
bercanda dalam berkerja, hindari tangan pada saat menghidupkan stamp
dan hindari kaki pada saat melaksanakan pemadatan tanah urugkan kemba
memakai sepatu kerja, kaos tangan dan helm kerja.
d. Perhitungan Analisa
* Volume urugan kembali : -
* Urugan tanah peninggi lantai menggunakan tanah pilihan yang diambil dari qua
yang disetujui oleh direksi.
* Urugan Tanah harus digunakan Tanah pilihan atau sesuai petunjuk Direksi
Urugan Tanah urugan dengan
ketinggian dan lebar urugan
sesuai gambar.
* Melakukan pemeriksaan secara bersama - sama dengan direksi atas hasil pekerja
sebelum dilakukan opname pekerjaan, mengambil dokumen pekerjaan sebag
bahan laporan.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki akibat : terkena ban truck, scop pada saat penghamparan tanah ur
dan pada saat pemadatan tanah menggunakan stapel. Luka tangan akiba
terkena tutupan bak dump truck, menghidupkan peralatan stampel.
* Pengendalian Resiko K3
- Hati - hati dalam menggatur atrekan dump truck jauhkan dari kita ya
menggatur, jangan bercanda pada saat berkerja, mengatur jarak pada sa
penghamparan tanah urug dengan scop dan jauhkan kaki pada sa
memegang stampel pada saat pemadatan. Luka Tangan Hati hati tangan pa
saat membuka bak truck di usahakan diperhatikan betul pada saat menut
pintu bak truck, usahakan teliti dalam menghidupkan mesin stampel, mema
sepatu kerja, kaos tangan dan helm kerja.
d. Perhitungan Analisa
* Volume urugan Tanah : -
* Urugan pasir harus digunakan pasir urug atau sesuai petunjuk Direksi
* Melakukan pemeriksaan secara bersama - sama dengan direksi atas hasil pekerja
sebelum dilakukan opname pekerjaan, mengambil dokumen pekerjaan sebag
bahan laporan.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki akibat : terkena ban truck, scop pada saat penghamparan pasir ur
pada pondasi dan pasir urug dibawah lantai . Luka tangan akibat : terken
tutupan bak dump truck.
* Pengendalian Resiko K3
- Hati - hati dalam menggatur atrekan dump truck jauhkan dari kita ya
menggatur, jangan bercanda pada saat berkerja, mengatur jarak pada sa
penghamparan pasir urug dibawah pondasi maupun dibawah lantai deng
scop. Luka Tangan Hati hati tangan pada saat membuka bak truck di usahak
diperhatikan betul pada saat menutup pintu bak truck.
d. Perhitungan Analisa
* Volume urugan Pasir : -
* Dalam penyusunan batu kosong dianjurkan ada selah atau rongga untuk pasir uru
dan dilanjutkan dengan penyiraman untuk menghasilkan ikatan antara batu ya
satu dengan yang lain.
* Melakukan pemeriksaan secara bersama - sama dengan direksi atas hasil pekerja
sebelum dilakukan opname pekerjaan, mengambil dokumen pekerjaan sebag
bahan laporan.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki akibat : terkena ban truck, terkenah batu kali pada sa
pengangkutan, terkena batu kali pada saat menurunkan batu kali ya
diangkut, terkena batu kali pada saat penyusunan batu . Luka tangan akiba
terkena tutupan bak dump truck, terkena batu kali tusukan batu kali ya
runcung dan terkena tangan pada saat penyusunan batu.
* Pengendalian Resiko K3
- Hati - hati dalam menggatur atrekan dump truck jauhkan dari kita ya
menggatur, jangan bercanda pada saat berkerja, diperhatikan kaki pada sa
mengangkut batu dan pada saat menurunkan batu serta perhatikan kaki pad
saat rekan yang lain mendekatkan batu pada lokasi pekerjaan. Luka Tang
Hati hati tangan pada saat membuka bak truck di usahakan diperhatikan be
pada saat menutup pintu bak truck, diperhatikan tangan pada saat pengangk
batu, menurunkan batu serta pada saat menyusun batu.
d. Perhitungan Analisa
* Volume Pas. Batu Kosong : 0.12
4.7 Pasangan Batu Kali 1 Pc : 5 Psr
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Setting elevasi dan memasang profil / bouwplank sesuai dengan dimensi renca
dengan tenaga pekerja dan tukang batu.
* Menyiapkan bahan untuk pekerjaan pasangan batu diantaranya : Batu kali ala
pasir, semen, kotak takaran dan kotak untuk campuran 1Pc : 5Ps manual dan
untuk memenuhi kebutuhan air menggunakan pompa air.
- Luka kaki akibat : terkena ban truck, terkenah batu kali pada sa
pengangkutan, terkena batu kali pada saat menurunkan batu kali ya
diangkut, terkena scop atau pacul peralatan pencampuran spesi, terkena ba
kali pada saat penyusunan batu . Luka tangan akibat : terkena tutupan b
dump truck, terkena batu kali tusukan batu kali yang runcung dan terke
tangan pada saat penyusunan batu untuk pasangan batu kali.
* Pengendalian Resiko K3
- Hati - hati dalam menggatur atrekan dump truck jauhkan dari kita ya
menggatur, jangan bercanda pada saat berkerja, diperhatikan kaki pada sa
mengaduk spesi, diperhatikan kaki pada saat mengangkut batu dan pada sa
menurunkan batu serta perhatikan kaki padaa saat rekan yang l
mendekatkan batu pada lokasi pekerjaan. Luka Tangan Hati hati tangan pa
saat membuka bak truck di usahakan diperhatikan betul pada saat menut
pintu bak truck, diperhatikan tangan pada saat pengangkat batu, menurunk
batu serta pada saat menyusun batu untuk pasangan batu kali.
d. Perhitungan analisa
* Volume Pas. Batu Kali 1:5 : 0.19
Setting elevasi dan memasang profil / bouwplank sesuai dengan dimensi renca
diusahan tidak terlalu tinggi untuk dapat memantau kelurusan pasangan ba
maksimal satu meter untuk jarak benang.
* Menyiram / membasahi bata terlebih dahulu yang akan dipasang guna menjam
ikatan yang baik untuk pasangan bata.
- Luka kaki dan kepala akibat : terkena ban dump truck, tertimpah batu ba
pada saat pembawa batu bata . Luka tangan akibat : terkena jepitan batu ba
pada saat penurunan dan penyusunan batu bata.
* Pengendalian Resiko K3
- Hati - hati dalam menggatur atrekan dump truck jauhkan dari kita ya
menggatur, pada saat memberi batu bata pada tukang batu oleh pekerja har
diperhatikan betul dan jangan bercanda pada saat berkerja. Luka Tangan H
hati tangan hati - hati pada saat pengkatan, penurunan serta penyusun
bata agar menjauhan tangan setelah mengangkat dan menyusun batu ba
memakai stegel yang koko untuk pemasangan bata yang lebih tinggi.
d. Perhitungan analisa
* Volume Pas. Dinding Bata 1:5 : 122.05
- Luka kaki dan kepala akibat : terkena ban dump truck yang membawah pa
luka kepala akibat tertimpah spesi atau kota spesi.
* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam menggatur atrekan dump truck jauhkan dari k
yang menggatur, jangan bercanda atau main - main pada saat berker
Kepalah : memakai helm kerja.
d. Perhitungan analisa
* Volume Plesteran Dinding Bata 1Pc : 5Psr : 354.27
4.10 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Menyiram / membasahi beton terlebih dahulu yang akan diplester guna menjam
ikatan yang baik.
- Luka kaki dan kepala akibat : terkena ban dump truck yang membawah pa
luka kepala akibat terjatuh dari atas pada saat plesteran dinding yang tinggi.
* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam menggatur atrekan dump truck jauhkan dari k
yang menggatur, jangan bercanda atau main - main pada saat berker
Kepalah : memakai helm kerja.
d. Perhitungan analisa
* Volume Plesteran Beton 1PC : 3Psr : Err:509
4.11 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Campuran acian harus benar benar kental untuk menjamin ikatan antara acian d
plesteran.
- Luka kaki dan kepala akibat : terkena ban dump truck yang membawah pa
luka kepala akibat terjatuh dari atas pada saat plesteran dinding yang tinggi.
* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam menggatur atrekan dump truck jauhkan dari k
yang menggatur, jangan bercanda atau main - main pada saat berker
Kepalah : memakai helm kerja.
d. Perhitungan analisa
* Volume Acian : Err:509
PEKERJAAN BETON
4.12 Pekerjaan Sloof Uk. 15/20
Pembesian
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
Pembesian Sloof :
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.
d. Perhitungan analisa
* Volume Pembesian Beton Sloof 15/20 cm : 132.00
Begesting Sloof
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting sloof yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume Begesting Sloof : -
Beton K 175
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton Sloof mutu k 175 dengan ukuran 15/
cm , di antaranya : semen, pasir beton,Kerikir , air, kotak takaran, dan kotak unt
campuran menggunakan peralatan Concreter Mixer, serta menggunakan tena
tukang batu.
* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata, pekerjaan ini dilakukan sesuda pemasangan pond
batu kali.
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata, pekerjaan ini dilakukan sesuda pemasangan pond
batu kali.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan memakai sepatu kerja dan helm kerja.
d. Perhitungan analisa
* Volume Beton Sloof : -
Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
Pembesian Kolom 40/40 cm :
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.
d. Perhitungan analisa
* Volume Pembesian Beton kolom 40/40 cm : -
- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku, memakai kaos tangan kerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting Kolom 40/40 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume Begesting Kolom 40/40 cm : -
Beton K175
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton Kolom , mutu K 175 dengan ukuran 40/
cm , di antaranya : semen, pasir beton,Kerikir , air, kotak takaran, dan kotak unt
campuran menggunakan peralatan Concreter Mixer, serta menggunakan tena
tukang batu. beton kolom 40/.40 untuk Kolom Emperan.
* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata, pekerjaan ini dilakukan sesuda pemasangan pond
batu kali.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
d. Perhitungan analisa
* Volume Beton Kolom 40/40 cm : 0.11
* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
Pembesian Kolom 20/20 cm :
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.
d. Perhitungan analisa
* Volume Pembesian Beton kolom 20/20 cm : 156.27
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku, memakai kaos tangan kerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting Kolom 20/20 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume Begesting Kolom 20/20 cm : 0.09
Beton K175
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton Kolom , mutu K 175 dengan ukuran 20/
cm , di antaranya : semen, pasir beton,Kerikir , air, kotak takaran, dan kotak unt
campuran menggunakan peralatan Concreter Mixer, serta menggunakan tena
tukang batu. beton kolom 20/.20 untuk Kolom induk bangunan.
* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata, pekerjaan ini dilakukan sesuda pemasangan pond
batu kali.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan memakai sepatu kerja dan helm kerja.
d. Perhitungan analisa
* Volume Beton Kolom 20/20 cm : -
* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
Pembesian Kolom 13/13 cm :
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku, memakai kaos tangan kerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting Kolom 13/13 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.
* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata, pekerjaan ini dilakukan sesuda pemasangan pond
batu kali.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan memakai sepatu kerja dan helm kerja.
d. Perhitungan analisa
* Volume Beton Kolom 13/13 cm : -
4.16 Err:509
Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Pekerjaan pembesian ini menyangkut pembesian untuk beton balok 15/25 unt
balok gantung yang dirakit sesuai ukuran tercantum dalam bestek atau sesu
petunjuk direksi.
* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.
d. Perhitungan analisa
* Volume Balok Beton 15/25 cm : Err:509
Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Menyiapkan bahan untuk pekerjaan Begesting untuk balok 15/25 di antaranya
papan kayu klas III, paku dan Teak oil dan menggunakan peralatan tukang kayu.
* Membuat kerangka begesting untuk tempat pengecoran beton sesuai deng
ukuran beton yang dicor.
b. Pengendalian Resiko
K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting balok 15/25 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume Begesting Balok 15/25 cm : Err:509
Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton balok K.175, di antaranya : semen, pa
beton,Kerikir , air, kotak takaran, dan kotak untuk campuran menggunak
peralatan Concreter Mixer, serta menggunakan tenaga tukang batu.
* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan membuat stager yang kokoh agar tidak mud
roboh.
d. Perhitungan analisa
* Volume Beton Balok 15/25 cm : Err:509
* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting Ring Balok ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.
* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan membuat stager yang kokoh agar tidak mud
roboh.
d. Perhitungan analisa
* Volume Beton Ring Balok : 0.48
4.18 Err:509
Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Pekerjaan pembesian ini menyangkut pembesian untuk beton plat dak yang dirak
sesuai ukuran tercantum dalam bestek, ketebalan yang tertera dalam bestek at
sesuai petunjuk direksi.
Pekerjaan pembesian ini menyangkut pembesian untuk beton plat dak yang dirak
sesuai ukuran tercantum dalam bestek, ketebalan yang tertera dalam bestek at
sesuai petunjuk direksi.
* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.
d. Perhitungan analisa
* Volume Pembesian Plat Dak : Err:509
Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Menyiapkan bahan untuk pekerjaan Begesting untuk plat dak di antaranya : pap
kayu klas III, balok kayu, paku, Teak oil dan kayu Dolken sebagai perancang se
menggunakan peralatan tukang kayu.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting plat dak yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume Begesting Plat Dak : Err:509
Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton plat dak K.175, di antaranya : seme
pasir beton,Kerikir , air, kotak takaran, dan kotak untuk campuran menggunak
peralatan Concreter Mixer, serta menggunakan tenaga tukang batu.
* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan membuat stager yang kokoh agar tidak mud
roboh.
d. Perhitungan analisa
* Volume Beton Plat Dak : Err:509
4.19 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton Tumbuk K.100, di antaranya : seme
pasir beton,Kerikir , air, kotak takaran, dan kotak untuk campuran menggunak
peralatan Concreter Mixer, serta menggunakan tenaga tukang batu.
* Pekerjaan lantai beton yang dimaksud disini untuk lantai kerja sebelu
pemasangan lantai keramik jadi lantai harus di cor duluh dengan lantai kerja bet
K. 100 dan dilanjutkan dengan pemasangan keramik.
* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer, memakai sepatu kerja, kaos tangan kerja.
Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer, memakai sepatu kerja, kaos tangan kerja.
d. Perhitungan analisa
* Volume Beton Lantai Kerja : Err:509
PEKERJAAN KUSEN
4.20 Kusen Pintu dan Jendelah Kayu Klas I
* Pada saat pemasangan dinding maka harus dipersiapkan lubang kusen agar tid
perlu melakukan pembongkaran, ukuran lubang disesuaikan dengan ukuran kus
ditambah 1 cm untuk tempat sealent.
* Lalu kita masukan kusen kedalam lubang, mengatur agar posisinya pas deng
menggunakan alat beji, setelah posisi pas maka kita stel kelurusan kusen deng
dinding, ketegakan dan kedataran sampai benar-benar bagus.
* Kita buat lubang untuk tempat sekrup pada dinding melalui lubang kusen deng
menggunakan alat bor, kenmudian kita masukan fischer kedalam lubang bor ya
telah kita buat lalu kita ambil obeng untuk mengencangkan fischer.
* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam mengangkat alumenium, memakai sepatu ke
dan jangan bercanda atau main - main pada saat berkerja, luka tangan
memakai kaos tangan kerj.
d. Perhitungan analisa
* Volume Kusen pintu, Kusen Jendela & Ventilasi Alumenium : 0.88
* Pada saat pemasangan dinding maka harus dipersiapkan lubang kusen agar tid
perlu melakukan pembongkaran, ukuran lubang disesuaikan dengan ukuran kus
ditambah 1 cm untuk tempat sealent.
* Lalu kita masukan kusen kedalam lubang, mengatur agar posisinya pas deng
menggunakan alat beji, setelah posisi pas maka kita stel kelurusan daun pintu d
daun jendela dengan dinding, ketegakan dan kedataran sampai benar-benar bagu
* Kita buat lubang untuk tempat sekrup pada dinding melalui lubang kusen deng
menggunakan alat bor, kenmudian kita masukan fischer kedalam lubang bor ya
telah kita buat lalu kita ambil obeng untuk mengencangkan fischer.
* Kita siapkan daun pintu atau daun jendela yang sudah dirangkai penuh, misaln
sudah terpasang kaca dengan sempurna.
* Daun pintu atau daun jendela kita masuk kelubang kusen kemudian kita pasa
semua aksesories seperti engsel, roda, rel, handlel, door dan lainnya.
* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam mengangkat alumenium, memakai sepatu ke
dan jangan bercanda atau main - main pada saat berkerja, luka tangan
memakai kaos tangan kerj.
d. Perhitungan analisa
* Volume Daun Pintu dan Daun Jendelah : 6.40
4.22 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki akibat : tertimpah sun blant serta luka tangan pada sa
pemotongan sun blant..
* Pengendalian Resiko K3
- Memakai sepatu kerja dan kaos tangan kerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Sun Blant yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume Sun Blant : Err:509
PEKERJAAN PLAFOND
4.23 Memasang Langit - Langit Tripleks ( 120 x 240 ) cm, Tebal 3 mm
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pemasangan rangka plafoond dan plafoond tripleks ya
rangka plafoond menggunakan kayu Kls II 5/7 cm untuk balok induk dan 4/6
untuk balok pembagi, plafoond tripleks 3 mm, paku dan peralatan tukang ka
serta benang .
* memasang gantung plafoond dengan kayu sekuat mungkin kalau perlu diadak
pengetesan untuk mengetahui kekuatan gantungan plafoond karna dia sebag
penahan beban plafoond keseluruhan.
* Setelah gantung plafoond selesai dan diangap kuat untuk pemasangan plafoo
maka dilanjutkan dengan pemotong tripleks 3 mm dengan ukuran sesuai bes
rangka plafoond dan diusahan pada saat pemasangan rangka maupun triple
harus memakai steger agar muda dalam pelaksanannya.
* Pemasangan tripleks harus dibarengi dengan pengukuran water pass unt
mengetahui kedataran pemasangan dan batas batas pemasangan rangka maup
plafoond harus dibatasi dengan benang pembatas.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki atau kepalah akibat :terjatu dari atap pada saat pemasang
plafoond. Luka Tangan : terkena gergaji pemotong kayu maupun tripleksd
terkena palu pada saat pemasangan plafoond.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati - hati terjatu dalam memasangan plafoon
memakai steger, helm kerja . Luka tangan : hati - hati dalam memotong ka
maupun tripleks, memakai kaos tangan kerjan dan jangan bercanda atau ma
- main pada saat berkerja.
d. Perhitungan analisa
* Volume Plafoond Tripleks 3 mm : 261.00
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki atau kepalah akibat :terjatu dari atap pada saat pemasangan
plafoond. Luka Tangan : terkena gergaji pemotong list plafoond maup
terkena palu pada saat pemasangan list plafoond.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati - hati terjatu dalam memasangan list plafoon
memakai steger, helm kerja . Luka tangan : hati - hati dalam memotong
plafoond, memakai kaos tangan kerjan dan jangan bercanda atau main - m
pada saat berkerja.
d. Perhitungan analisa
* Volume List Plafoond : 130.00
PEKERJAAN LANTAI
4.25 Pasang Lantai Keramik 30 x 30 Cm
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pemasangan keramik yaitu peralatan tukang batu, alat pemoto
keramik dan lain-lain.
* Mengunakan bahan keramik yang berukuran 40 x 40 cm polos , semen, sem
warna, pasir, dengan kualitas baik .
* Memulai pekerjaan pemasangan keramik 40 x 40 cm harus sesuai petunjuk direk
* Permukaan Lantai yang dipakai untuk pemasangan lantai keramik harus be
cukup kering dan rata air.
* Sebelum dipasang keramik agar direndam pakai air agar mudah merekat deng
spesi.
* Setiap jalur untuk pemasangan keramik lantai ditarik benang rata air.
* Adukan spesi untuk pemasangan keramik harus penuh baik permukaan das
maupun belakang keramik lantai dengan ketebalan spesi rata - rata 2 sampai 4 cm
* Lebar nat yang dianjurkan untuk yaitu antara 4 sampai 5 mm dari campuran sem
atau bahan lain yang dianjurkan oleh pihak direksi.
* membersihakan spasi yang nempel dipermukaan lantai yang sudah terpasa
dengan air. Dari gambar dibawah yang dipasang keramik 40/40 cm yang tidak ar
hitam.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki akibat : tertimpah keramik lantai pada saat mengambil keram
Tangan akibat : terjepit pemotong keramik dan kena palu jari pada sa
memadatkan pasangan keramik lantai.
* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam mengangkat keramik diusahan diangkat sa
persatu, memakai sepatu kerja. Luka tangan : hati - hati dalam memoto
keramik dan memadatkan keramik dengan palu atau alat pemukul keram
agar padat dan berisi diusahakan memperhatikan tangan, memakai ka
tangan kerja dan jangan bercanda atau main - main pada saat berkerja.
d. Perhitungan analisa
* Volume Keramik 40 x 40 cm : 104.40
4.26 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pemasangan lantai keramik KM/WC yaitu peralatan Tukang Ba
dan Peralatan Pemotong keramik lantai.
* Mengunakan keramik yang berukuran 20 x 20 cm yang bermotif dengan kualitas
yang baik .
* Memulai pekerjaan pemasangan keramik 20 x 20 cm untuk lantai KM/WC haru
sesuai petunjuk direksi.
* Sebelum dipasang keramik agar direndam pakai air agar mudah merekat deng
spesi.
* Setiap jalur untuk pemasangan keramik lantai ditarik benang rata air.
* Adukan spesi untuk pemasangan keramik harus penuh baik permukaan das
maupun belakang keramik lantai dengan ketebalan spesi rata - rata 2 sampai 4 cm
* Lebar nat yang dianjurkan untuk yaitu antara 4 sampai 5 mm dari campuran sem
atau bahan lain yang dianjurkan oleh pihak direksi.
* membersihakan spasi yang nempel dipermukaan lantai yang sudah terpasa
dengan air. Yang kamar mandi dan WC yang diwarnai dengan hitam itu ya
dipasang keramik lantai 20/20 cm.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki akibat : tertimpah keramik lantai pada saat mengambil keram
Tangan akibat : terjepit pemotong keramik dan kena palu jari pada sa
memadatkan pasangan keramik lantai.
* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam mengangkat keramik diusahan diangkat sa
persatu. Luka tangan : hati - hati dalam memotong keramik dan memadatk
keramik dengan palu atau alat pemukul keramik agar padat dan be
diusahakan memperhatikan tangan, jangan bercanda atau main - main pa
saat berkerja.
* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan lantai keram
KM/WC , 20 x 20 Cm yang sudah dikerjakan dan memperbaiki kembali pekerja
yang kurang memuaskan sampai diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume Keramik lantai 20 x 20 cm : Err:509
4.27 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pemasangan Dinding keramik yaitu peralatan Tukang Batu d
Peralatan Pemotong keramik dinding.
* Mengunakan keramik yang berukuran 20 x 25 cm yang bermotif dengan kualitas
yang baik .
* Memulai pekerjaan pemasangan keramik 20 x 25 cm untuk dinding KM/WC haru
sesuai petunjuk direksi.
* Sebelum dipasang keramik agar direndam pakai air agar mudah merekat deng
spesi.
* Setiap jalur untuk pemasangan keramik dinding ditarik benang rata.
* Adukan spesi untuk pemasangan keramik harus penuh baik permukaan das
maupun belakang keramik dinding dengan ketebalan spesi rata - rata 2 cm.
* Lebar nat yang dianjurkan untuk yaitu antara 2 mm dari campuran semen at
bahan lain yang dianjurkan oleh pihak direksi.
* Pada saat pemasangan dinding keramik harus diberi
* membersihakan spasi yang nempel dipermukaan lantai yang sudah terpasa
dengan tali air dengan jarak tertentu dengan pertimbangan desain agar tid
menerima beban terlalu berat.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki akibat : tertimpah keramik dinding pada saat mengambil keram
Tangan akibat : terjepit pemotong keramik dan kena palu jari pada sa
memadatkan pasangan keramik dinding.
* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam mengangkat keramik diusahan diangkat sa
persatu. Luka tangan : hati - hati dalam memotong keramik dan memadatk
keramik dengan palu atau alat pemukul keramik agar padat dan be
diusahakan memperhatikan tangan, jangan bercanda atau main - main pa
saat berkerja.
d. Perhitungan analisa
* Volume Keramik Dinding KM/WC , 20 x 25 cm : Err:509
PEKERJAAN ATAP
4.28 Pasang Rangka Atap Kayu
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat mobilisasi rangka baja dan peralatan pemasangan rangka b
ringan sesuai dengan kebutuhan .
* Baja ringan harus mempunyai berat struktur yang ringan yaituh 9 - 10 Kg/M2
* Memulai pekerjaan kayu Kap Kuda - kuda Klas I harus sesuai petunjuk direksi.
* Tebal Profil C untuk kuda-kuda utama minimal 0,8 mm TCT, tinggi penampang
minimal 75 sedangkan tebal profit untuk reng genteng minimal 5 mmTCT.
* Menggunakan baut penyambung 12-14 x 20 HEX ITW Buildex untuk struktur kud
kuda dan baut 10-16 x HEX untuk reng.
* Menyiapkan gambar shp drawing untuk menyeyesuaikan bentuk kuda- kuda berik
ukurannya, spacing, overhang, jarak reng dan jumlah dan lokasi baut.
* Setiap kuda kuda harus ditandai atau dinomor untuk menghidari kesalah
pemasangan.
* Sebelum pemasangan rangka baja harus diperiksa kembali permukaan ring b
apakah sudah berada dalam satu bidang/lever, jika tidak, harus diberi ganjaran at
dudukan sehingga tidak ada gap antara ring balk dan kuda - kuda. Tidak dianjurk
menggunakan material kayu, balok kayu sebagai bahan ganjaran atau bah
dudukan permanen.
* Kuda-kuda yang sudah dirakit diangkat keatas ring balk secara manual atau deng
alat crane. Untuk menggunakan crane harus di ikat dua titik sebagai titik tum
angkut, kuda-kuda harus diangkat secara hati-hati untuk menghidari dari res
lentur , terbanting atau lepas sambungannya.
* Semua kuda-kuda harus diereksi dalam bidang, vertikal dan sejajar satu sama la
terpasang akurat pada tempatnya sesuai jarak dalam gambar. Setelah kuda-ku
naik keatas dan duduk pada posisinya, harus dipasang/ disediakan braci
sementara untuk mencegah robohnya struktur kuda-kuda.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki atau kepalah akibat :terjatu dari atap pada saat pemasangan rang
baja ringan . Luka Tangan : terkena alat pemotong rangka baja ringgan.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati - hati dalam memasangan rangka baja ring
karna baja ringgan mudah patah, memperkuat ikatan antara baja ringan unt
kuda - kuda dan usuk reng. Luka tangan : hati - hati dalam memotong rang
baja ringan dan jangan bercanda atau main - main pada saat berkerja.
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan rangka baja ringan dilaksanakan pada minggu ke 2 bulan III sesuai deng
jadwal pekerjaan.
d. Perhitungan analisa
* Volume Rangka Baja Ringan : 238.99
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki atau kepalah akibat :terjatu dari atap pada saat pemasangan at
genteng metal roof karna licin. Luka Tangan : terkena alat pemotong at
metal roof.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati - hati terjatudalam memasangan atap metal ro
karna licin . Luka tangan : hati - hati dalam memotong atap metal roof kar
tajam terkena tangan dan jangan bercanda atau main - main pada sa
berkerja.
d. Perhitungan analisa
* Volume Atap Metal Roof : 356.70
- Luka kaki atau kepalah akibat :terjatu dari atap pada saat pemasang
bubungan genteng metal roof karna licin. Luka Tangan : terkena alat pemoto
dan menyambung bubungan metal roof.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati - hati terjatu dalam memasangan bubung
metal roof karna licin . Luka tangan : hati - hati dalam memotong d
menyambung bubungan metal roof karna tajam terkena tangan dan jang
bercanda atau main main pada saat berkerja.
d. Perhitungan analisa
* Volume bubungan genten metal roof : 30.50
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki atau kepalah akibat : atau tertimpah papan kayu dan terjatu pa
saat pemasangan lisplank.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : hati - hati dalam mengangkat papan lisplank untuk
pasang dan diusahakan untuk membuat stager yang sangat kuat serta kok
agar tidak mudah roboh. Luka tangan : hati - hati memaku papan lispank ag
memperjatikan tangan dan jangan bercanda atau main - main pada sa
berkerja.
d. Perhitungan Analisa
* Volume Lisplank Kayu Kls II : 41.80
PEKERJAAN PENGUNCI
4.32 Kunci Pintu 2 Slag KW I
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan peralatan pemasangan kunci tanam 2 slag yaituh peralatan tuka
kayu dan obeng.
* Mengunakan bahan kunci yang berkualitas baik (KW I) dan harus mendapatk
persetujuan direksi.
Membuat lubang kunci sesuai dengan ukuran kunci yang tersedia.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki atau kepalah akibat : tertimpa daun pintu pada saat pemasanga
Luka tangan : terkena gergaji pada sat memotong daun pintu.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati-hati dalam mengangkat daun pintu diusahak
banyak orang. Luka tangan : pelan - pelan dalam mengergaji daun pintu da
jangan bercanda atau main - main pada saat berkerja.
d. Perhitungan analisa
* Volume pemasangan kunci tanam 2 slag : 6.00
4.33 Engsel Nylon
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan engsel nylon yaitu peralatan tukang kayu dan oben
* Mengunakan bahan engsel nylon untuk dipasang pada daun pintu sebagai bah
pengikat supaya bisa dibuka tutup pada daun pintu .
* Memulai pekerjaan Pemasangan engsel pintu harus sesuai petunjuk direksi.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki atau kepalah akibat : tertimpa daun pintu pada saat pemasanga
Luka tangan : terkena alat pemotong pada sat memotong daun pintu.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati-hati dalam mengangkat daun pintu diusahak
banyak orang. Luka tangan : pelan - pelan dalam memotong daun pintu da
jangan bercanda atau main - main pada saat berkerja, memakai kaos tang
kerja dan sepatu kerja.
d. Perhitungan analisa
* Volume engsel nylon : 10.00
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki atau kepalah akibat : tertimpa daun pintu pada saat pemasanga
Luka tangan : terkena alat pemotong pada saat memotong daun jendela.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati-hati dalam mengangkat daun pintu diusahak
banyak orang. Luka tangan : pelan - pelan dalam memotong daun jendela da
jangan bercanda atau main - main pada saat berkerja, memakai kaos tang
kerja dan sepatu kerja..
d. Perhitungan analisa
* Volume engsel Kupu-kupu : 16.00
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki atau kepalah akibat : tertimpa hak angin pada saat pemasanga
Luka tangan : terjepit pintu pada saat pemasangan hak angin.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati-hati dalam mengangkat daun jende
diusahakan banyak orang. Luka tangan : pelan - pelan dalam mengergaji da
jendelah dan jangan bercanda atau main - main pada saat berkerja.
d. Perhitungan analisa
* Volume hak angin : 32.00
- Luka kaki atau kepalah akibat : tertimpa daun jendelah pada saat pemasanga
Luka tangan : terjepit daun jendela pada saat pemasangan grender.
* Pengendalian Resiko K3
- Memakai sepatu kerja dan kaos tangan kerja serta hati hati dalam berkerja d
tidak banyak bercanda serta main - main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan grender kecil yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume grender kecil : 30.00
PEKERJAAN PENGECATAN
4.37 Pengecetan Tembok Baru
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pembuatan untuk pengecetan Dinding yang dibutukan sepe
kuas, rol dan lain lain. .
* Mengunakan cat dasar untuk lapis pertama dengan satu kali dan dilanjutk
dengan dua kali cat penutup dan dengan kualitas yang baik yang terdapat pa
toko atau distributor resmi .
- Luka kaki atau kepalah akibat : terjatu dari pada saat pengecetan dibagi
atas. Mata buta atau peri : terkena tumpahan cat pada saat pengecetan bagi
yang atas. Luka tangan : terkena gesekan amplas dan tembok pada sa
membersikan dan meratakan plamir pada dinding.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : membuat stager yang koko dan kuat agar tid
mudah roboh, memakai helm sebagai pelindung kepala. Luka Mata : mema
kaca mata kerja untuk menghidari tumpahan cat pada mata saat mengec
Luka tangan : pelan - pelan dalam mengosok diusahan amplas dibungk
dengan potongan kayu 5/7 sebagai alas gosok agar tangan tidak bersentuh
langsung dengan amplas dan dinding dan jangan bercanda atau main - ma
pada saat berkerja.
d. Perhitungan analisa
* Volume Cat Tembok dan Beton : 824.66
- Luka kaki atau kepalah akibat : terjatu dari pada saat pengecetan dibagi
atas. Mata buta atau peri : terkena tumpahan cat pada saat pengecetan bagi
yang atas. Luka tangan : terkena gesekan amplas dan plafoond pada sa
membersikan dan meratakan plamir pada plafoond.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : membuat stager yang koko dan kuat agar tid
mudah roboh, memakai helm sebagai pelindung kepala. Luka Mata : mema
kaca mata kerja untuk menghidari tumpahan cat pada mata saat mengec
Luka tangan : pelan - pelan dalam mengosok diusahan amplas dibungk
dengan potongan kayu 5/7 sebagai alas gosok agar tangan tidak bersentuh
langsung dengan amplas plafoond dan jangan bercanda atau main - ma
pada saat berkerja.
d. Perhitungan analisa
* Volume Cat Plafoond : 261.00
Err:509
4.39 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan closed jongkok KW. I yaitu peralatan tukang batu d
lain-lain.
* menggunakan closed jongkok yang berkualitas baik yang terdapat pada distribu
resmi.
* Memulai pekerjaan Pemasangan closed jongkok harus sesuai petunjuk direksi.
* Memasang pasangan bata untuk peninggi dudukan klosed jongkok den diples
halus serta di aci, memasang closed sesuai dengan lubang pembuangan kotor
yang menuju septitenk.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki dan Tangan akibat : tertimpa dan terjepit closed jongkok.
* Pengendalian Resiko K3
- Luka tangan : hati - hati dalam mengangkat dan memasang closed jongk
serta jangan bercanda atau main - main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan closed jongk
yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume closed jongkok : Err:509
4.40 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan pipa dia. 3" yaitu peralatan tukang pipa d
pengelasan.
* menggunakan pipa PVC dia. 3 " dan lem pipa yang berkualitas baik yang terdap
pada distributor resmi.
* Memulai pekerjaan Pemasangan pipa PVC harus sesuai petunjuk direksi.
* memasang pipa PVc Diam. 3" untuk air kotor yang menuju pada bak septite
dengan sambungan sesuai dengan kebutuhan.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
d. Perhitungan analisa
* Volume Pipa 3 " : Err:509
4.41 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan pipa dia. 2" yaitu peralatan tukang pipa d
pengelasan.
* menggunakan pipa PVC dia. 2 " dan lem pipa yang berkualitas baik yang terdap
pada distributor resmi.
* Memulai pekerjaan Pemasangan pipa PVC harus sesuai petunjuk direksi.
* memasang pipa PVc Diam. 2" untuk air bersih dari sumur yang menuju pa
sambungan pipa menujuh pipa 3/4" dengan sambungan sesuai dengan kebutuhan
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
d. Perhitungan analisa
* Volume Pipa 2 " : Err:509
4.42 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan krang air yaitu peralatan tukang pipa dan lain-lain.
* menggunakan kran air dia. 3/4", Lem pipa, sto kran, pipa PVC, doubler neplen,
drak 3/4", sok drak 3/4" dan seal tape yang berkualitas baik yang terdapat pa
distributor resmi.
* Memulai pekerjaan Pemasangan kran air dia. 3/4" harus sesuai petunjuk direksi.
* Kita rakit pipa sesuai dengan ketentuan yang tercantum dalam spesifikasi ya
rekatkan seal tape pada double neplen pada setiap ujung dan sambungkan kn
drat dengan erat.
Kita rakit pipa sesuai dengan ketentuan yang tercantum dalam spesifikasi ya
rekatkan seal tape pada double neplen pada setiap ujung dan sambungkan kn
drat dengan erat.
* Potong pipa sesuai ukuran yang kita buat, oleskan pipa pada setiap ujung pipa ya
akan disambung
* Sambungan sto kran dengan pipa yang telah menyatu dengan double neplen d
kneet drat
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
d. Perhitungan analisa
* Volume pemasangan kran air dia. 3/4" : Err:509
4.43 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan pipa dia. 3/4" yaitu peralatan tukang pipa d
pengelasan.
* menggunakan pipa PVC dia. 3/4 " dan lem pipa yang berkualitas baik yang terdap
pada distributor resmi.
* Memulai pekerjaan Pemasangan pipa PVC harus sesuai petunjuk direksi.
* memasang pipa PVc Diam. 3/4" untuk air bersih yang menuju pada kran air deng
sambungan sesuai dengan kebutuhan.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
d. Perhitungan analisa
* Volume Instalasi Air Bersih : Err:509
4.44 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan septitenk yaitu peralatan tukang pipa, tukang ba
tukang besi, tukang kayu dan lain-lain.
* Kita mengali bak air kotor dan bak resapan dengan ukuran sesuai gambar at
kapasitas 2 M3, dilanjutkan dengan pemasangan 1/2 batu bata, dilanjutkan deng
plesteran dan acian pas, batu bata.
* Memasang pipa penyambung antara lubang closed dengan bak penampung kotor
dan bak resapan.
* Membuat kerangka anyaman besi untuk cor penutup septitenk dilanjutkan deng
membuat begesting, jagan lupa pemasangan pipa pembuangan asap kotoran se
dilanjutkan dengan cor penutup septitenk.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki dan kepala akibat : tertimpah batu bata pada saat pemasangan ba
bata. Luka tangan : terkena potongan besi, kayu dan pipa.
* Pengendalian Resiko K3
- Luka kaki dan kepala : hati - hati dalam memasang bata harus diperhatik
kepala. Luka Tangan :hati - hati dalam memotong besi, kayu maupun p
dengan gergaji serta jangan bercanda atau main - main pada saat berkerja.
d. Perhitungan analisa
* Volume septitenk : 2.00
PEKERJAAN LISTRIK
4.45 Titik Lampu
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan titik lampu yaitu obeng, taspek.
* Mengunakan bahan pemasangan titik lampu antara lain kabel, pipa sebagai a
penyambung kabel yang melalui beton dan lain-lain.
* Memulai pekerjaan Pemasangan titik lampu harus sesuai petunjuk direksi d
dikerjakan oleh tukang listrik.
* Pelaksanaan pemasangan titik lampu harus dilaksanakan pada saat sele
pemasangan batu bata untuk membuat dan memasang pipa dan kabel selanjutn
dilakukan plesteran..
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki dan kepala akibat : terjatu dari atap atau plafoond pada sa
pemasangan titik lampu karna rangka plafoond menggunakan hollow ya
mudah lendut. Luka tangan : kesetrum listri.
* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam melangka diatas plafoond. Luka tangan : hati - h
dalam memegang kabel usahakan menggunakan taspen , jangan bercan
atau main - main pada saat berkerja.
d. Perhitungan analisa
* Volume Pasang titik lampu : 16.00
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki dan kepala akibat : terjatu pada saat pemasangan lampu TL 20 Wa
Luka tangan : kesetrum listri.
* Pengendalian Resiko K3
- Luka kaki : membuat stager atau tempat berdiri yang kuat dan koko agar tid
mudah roboh yang mengakibatkan jatu. Luka tangan : hati - hati dala
memegang kabel usahakan menggunakan taspen , jangan bercanda at
main - main pada saat berkerja.
d. Perhitungan analisa
* Volume lampu TL 20 Watt : 16.00
4.47 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan lampu Pijat 15, 25 dan 40 Waat obeng, taspek.
* Memulai pekerjaan Pemasangan lampu pijat harus sesuai petunjuk direksi d
dikerjakan oleh tukang listrik.
* Mengunakan bahan tempat gantung lampu pijat 15, 25 dan 40 Watt philip ya
dipasang gantung di ruang sekolah dengan bahan tempat gantung lampu pijat d
lampu pijat yang berkualitas baik.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki dan kepala akibat : terjatu pada saat pemasangan lampu pijat. Lu
tangan : kesetrum listri.
* Pengendalian Resiko K3
- Luka kaki : membuat stager atau tempat berdiri yang kuat dan koko agar tid
mudah roboh yang mengakibatkan jatu. Luka tangan : hati - hati dala
memegang kabel usahakan menggunakan taspen , jangan bercanda at
main - main pada saat berkerja.
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan IV sesuai dengan jadwal pekerjaan
d. Perhitungan analisa
* Volume lampu pijat 15, 25 dan 40 Watt : Err:509
4.48 Saklar Ganda ( Setara Philips )
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan Saklar ganda obeng, tespen.
* Mengunakan bahan saklar ganda biasanya dipasang pada daerah jangkau
terdekat untuk digunaka dalam menghidupkan dan mematikan lampu baik lampu
20 Watt tersendiri dan lampu Pijat 15, 25 dan 40 Watt.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
d. Perhitungan analisa
* Volume saklar ganda : Err:509
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
d. Perhitungan analisa
* Volume saklar Tunggal : 1.00
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
d. Perhitungan analisa
* Volume stop kontak : 3.00
4.51 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan Zekering Box 1 Group obeng, taspek.
* Mengunakan bahan pemasangan zekering box 1 group dipasang pada sisi luar d
bangunan diusahakan ditempel pada dinding sebelah pintu utama.
* Memulai pekerjaan Pemasangan zekering box 1 group harus sesuai petunjuk dire
dan dikerjakan oleh tukang listrik.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- luka karna kesetrum listri.
* Pengendalian Resiko K3
- Hati - hati dalam memegang dan menyambung kabel usahakan menggunak
taspen , jangan bercanda atau main - main pada saat berkerja.
d. Perhitungan analisa
* Volume Pemasangan Zekering Box 1 Group : Err:509
- luka kaki tertimpah batu alam, luka tangan pada saat memotong batu alam.
* Pengendalian Resiko K3
- Memakai sepatu kerja, kaos tangan kerja dan jangan bercanda serta mai
main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan batu alam a
candi yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume Pemasangan Batu Alam Alur Candi : 3.00
4.53 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan peralatan tukang batu .
* Menyiapkan bahan paving blok dan pasir urug dengan kualitas baik yang terdap
pada toko bangunan atau distributor terdekat.
* Pertama tama seting bouplank untuk pemasangan paving blok dan dilanjutkan pa
di urug setinggi 10 cm pada lokasi pemasangan paving blok.
* Melakukan pemasangan paving blok jenis tiga berlian pada lokasi pekerjaan d
setelah pemasangan paving dilanjutkan dengan urugan pasir di rongga anta
paving satu dengan yang lain untuk pengikat paving.
* Pada batas atau pinggir luar dari pasangan paving harus di buatkan beton sebag
penjepit paving.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- luka kaki tertimpah paving, luka tangan terjepit paving pada saat pemasang
paving.
* Pengendalian Resiko K3
- Memakai sepatu kerja, kaos tangan kerja dan jangan bercanda serta mai
main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan Paving Blok (Ty
Tiga Berlian) yang sudah dikerjakan dan memperbaiki kembali pekerjaan ya
kurang memuaskan sampai diterima baik oleh Direksi.
d. Perhitungan analisa
* Volume Pemasangan Paving Blok : Err:509
VI. PENUTUP
Melakukan pengecekan terhadap semua pekerjaan yang telah dilaksanakan agar berfun
sesuai dengan yang telah disyaratkan dalam dokumen kontrak, melakuk
penyempurnaan-penyempurnaan terhadap pekerjaan yang masih kurang sempurn
supaya pada waktu Running Test berjalan sesuai yang diharapkan, melakukan pembersih
lapangan dari sisa-sisa bahan bangunan.
Demikian garis besar Metode Pelaksanaan ini kami buat untuk menjadi pedoman dala
pelaksanaan pekerjaan : Pembangunan Kantor Camat Woha Kabupaten Bima.
Err:509
Penawar,
Err:509
Err:509
sa Tente Kabupaten Bima
iapan/pembuatan Direksi
bangunan lama, photo
mobilisasi personil dan
penyiapan Gambar Kerja
ma.
sanaan pekerjaan.
= 1 Rol
= 1 Unit
ak diperbolekan bercanda
atu kerja dan helm kerja
Err:509 Pkt
- M3
uk Direksi
an setelah pemasangan
gan pondasi pada galian
an peninggi lantai dalam
reksi atas hasil pekerjaan
umen pekerjaan sebagai
- M3
hamparan per 15 cm
n menggunakan staper,
ai dengan bestek atau
petunjuk Direksi
reksi atas hasil pekerjaan
umen pekerjaan sebagai
- M3
juk Direksi
- M3
0.12 M3
ar kerja (Shoop Drawing)
an dimulai.
ai dari pondasi/koperan
0.19 M3
an dimulai.
5Psr di antaranya : Bata,
n.
ngan campura
am bata harus
bar di depan
esuai dengan
122.05 M2
an dimulai.
: 5Psr tebal 15 mm, untuk
kotak takaran, dan kotak
354.27 M2
an dimulai.
3Psr tebal 15 mm, untuk
n, air, kotak takaran, dan
Err:509 M2
an dimulai.
ranya : semen, air, kotak
etelah selesai pekerjaan
Err:509 M2
an dimulai.
menggunakan besi polos
kan peralatan pemotong
132.00 Kg
of di antaranya : papan
n tukang kayu.
an beton sesuai dengan
- M2
an dimulai.
175 dengan ukuran 15/20
takaran, dan kotak untuk
ta menggunakan tenaga
- M3
an dimulai.
menggunakan besi polos
kan peralatan pemotong
- Kg
m 40/40 cm di antaranya :
eralatan tukang kayu.
- M2
an dimulai.
175 dengan ukuran 40/40
takaran, dan kotak untuk
ta menggunakan tenaga
0.11 M3
an dimulai.
menggunakan besi polos
kan peralatan pemotong
156.27 Kg
m 20/20 cm di antaranya :
eralatan tukang kayu.
0.09 M2
an dimulai.
175 dengan ukuran 20/20
takaran, dan kotak untuk
ta menggunakan tenaga
unan.
- M3
an dimulai.
menggunakan besi polos
kan peralatan pemotong
m 13/13 cm di antaranya :
eralatan tukang kayu.
- M'
an dimulai.
menggunakan besi polos
kan peralatan pemotong
beton balok 15/25 untuk
alam bestek atau sesuai
Err:509 Kg
ok 15/25 di antaranya :
eralatan tukang kayu.
an beton sesuai dengan
Err:509 M2
an dimulai.
antaranya : semen, pasir
campuran menggunakan
ang batu.
Err:509 M3
an dimulai.
menggunakan besi polos
kan peralatan pemotong
g balok di antaranya :
eralatan tukang kayu.
an beton sesuai dengan
an dimulai.
antaranya : semen, pasir
campuran menggunakan
ang batu.
0.48 M'
an dimulai.
menggunakan besi polos
kan peralatan pemotong
Err:509 Kg
Err:509 M2
an dimulai.
5, di antaranya : semen,
campuran menggunakan
ang batu.
pengangkutan campuran
nuangkan diatas ayaman
Err:509 M3
an dimulai.
, di antaranya : semen,
campuran menggunakan
ang batu.
pengangkutan campuran
cara menuangkan diatas
Err:509 M3
an dimulai.
pintu, kusen jendela dan
l, fischer, sekrup, isolasi
ngkai sesuai ukuran kusen
0.88 M'
ar kerja (Shoop Drawing)
an dimulai.
pintu, daun jendela dan
l, fischer, sekrup, isolasi
ng sudah dirangkai sesuai
6.40 M2
an dimulai.
Err:509 M2
an dimulai.
an plafoond tripleks yaitu
balok induk dan 4/6 cm
n peralatan tukang kayu
r pemasangan plafoond
uk pemasangan plafoond
gan ukuran sesuai besar
rangka maupun tripleks
m memasangan plafoond,
ti dalam memotong kayu
ngan bercanda atau main
261.00 M2
an dimulai.
gunan atau distributor list
r pemasangan plafoond
130.00 M'
an dimulai.
kang batu, alat pemotong
m polos , semen, semen
ng rata air.
h baik permukaan dasar
ata - rata 2 sampai 4 cm
104.40 M2
an dimulai.
tu peralatan Tukang Batu
ng rata air.
h baik permukaan dasar
ata - rata 2 sampai 4 cm
Err:509 M2
an dimulai.
ralatan Tukang Batu dan
ang rata.
h baik permukaan dasar
rata - rata 2 cm.
ri campuran semen atau
i yang sudah terpasang
angan desain agar tidak
Err:509 M2
ar kerja (Shoop Drawing)
an dimulai.
pemasangan rangka baja
aituh 9 - 10 Kg/M2
uai petunjuk direksi.
TCT, tinggi penampang C
imal 5 mmTCT.
ldex untuk struktur kuda-
238.99 M2
an dimulai.
ng mengunakan Genteng
ik .
petunjuk direksi.
tas mutu hasil pekerjaan
emasangan Atap dengan
dan memperbaiki kembali
leh Direksi.
a saat pemasangan atap
ena alat pemotong atap
356.70 M'
memasangan bubungan
i dalam memotong dan
kena tangan dan jangan
an dimulai.
an dimulai.
yaituh peralatan tukang
ersedia.
6.00 Bh
ar kerja (Shoop Drawing)
an dimulai.
tukang kayu dan obeng.
i petunjuk direksi.
10.00 Psg
ar kerja (Shoop Drawing)
an dimulai.
latan tukang kayu dan
16.00 Psg
etunjuk direksi.
32.00 Bh
an dimulai.
n peralatan tukang kayu.
dipasang pada jendelah
ela .
ai petunjuk direksi.
30.00 Bh
an dimulai.
g yang dibutukan seperti
njuk direksi.
enuju kebawah dengan
nggunakan kuas.
aat pengecetan dibagian
a saat pengecetan bagian
dan tembok pada saat
824.66 M2
an dimulai.
d yang dibutukan seperti
unjuk direksi.
ujuh kekiri dengan terus
aat pengecetan dibagian
a saat pengecetan bagian
dan plafoond pada saat
261.00 M2
ar kerja (Shoop Drawing)
an dimulai.
eralatan tukang batu dan
osed jongkok.
Err:509 Bh
an dimulai.
alatan tukang pipa dan
tunjuk direksi.
Err:509 M'
an dimulai.
alatan tukang pipa dan
tunjuk direksi.
umur yang menuju pada
suai dengan kebutuhan.
Err:509 M'
an dimulai.
ang pipa dan lain-lain.
Err:509 Bh
an dimulai.
ralatan tukang pipa dan
etunjuk direksi.
uju pada kran air dengan
Err:509 M'
an dimulai.
ukang pipa, tukang batu,
2.00 Bh
an dimulai.
ek.
kabel, pipa sebagai alat
an dimulai.
pek.
sesuai petunjuk direksi
an dimulai.
aat obeng, taspek.
uai petunjuk direksi dan
Err:509 Bh
ar kerja (Shoop Drawing)
an dimulai.
l usahakan menggunakan
berkerja.
Err:509 Bh
l usahakan menggunakan
berkerja.
1.00 Bh
an dimulai.
aspek.
sang didekat tempat meja
berupa komputer, printer
s sesuai petunjuk direksi
l usahakan menggunakan
berkerja.
3.00 Bh
an dimulai.
, taspek.
pasang pada sisi luar dari
utama.
us sesuai petunjuk direksi
l usahakan menggunakan
berkerja.
Err:509 Bh
an dimulai.
3.00 M2
an dimulai.
Err:509 M2
Err:509
Penawar,
Err:509
Err:509
0