HARGA SATUAN BAHAN

TAHUN ANGGARAN 2015


A. BAHAN PASANGAN
Harga Satuan
No Uraian Satuan Keterangan
(Rp)
1 Batu Kali Alam M3 125,000
2 Batu Kali Belah M3 130,000
3 Batu Kali Keping/Tempel M3 175,000
4 Kerikil Alam 5 - 7 cm M3 150,000
5 Kerikil Pecah 5 - 7 cm
Kerikil Pecah 5 - 7 cm (M) M3 195,000
Kerikil Pecah 5 - 7 cm (MSC) M3 205,000
6 Kerikil Alam 3 - 5 cm M3 185,000
7 Kerikil Pecah 3 - 5 cm
Kerikil Pecah 3 - 5 cm (M) M3 200,000
Kerikil Pecah 3 - 5 cm (MSC) M3 225,000
8 Kerikil Alam 2 - 3 cm M3 225,000
9 Kerikil Pecah 2 - 3 cm
Kerikil Pecah 2 - 3 cm (M) M3 230,000
Kerikil Pecah 2 - 3 cm (MSC) M3 255,000
10 Kerikil Alam 1 - 2 cm M3 255,000
11 Kerikil Pecah 1 - 2 cm
Kerikil Pecah 1 - 2 cm (M) M3 255,000
Kerikil Pecah 1 - 2 cm (MSC) M3 275,000
12 Sirtu M3 110,000
13 Pasir Beton M3 175,000
14 Pasir Pasang M3 145,000
15 Pasir Urug M3 130,000
16 Tanah Urug Biasa M3 65,000
17 Tanah Urug Pilihan M3 80,000
18 Kapur Gamping/Labur Kg 6,000
19 Kapur Pasang Kg 3,000
20 Batu Bata Kls I Buah 800
21 Batu Bata Kls II Buah 700
22 Semen Warna Kg 14,500
- Butiran Halus Kg 14,500
23 - Butiran Kasar Kg 12,000
24 PC. Merk Tiga Roda (50 Kg) Zak 77,000
25 PC. Merk Gresik (50 Kg) Zak 75,000
26 PC. Merk Tonasa (50 Kg) Zak 74,000
27 PC. Merk Padang (50 Kg) Zak 74,500
28 PC. Merk Bosowa (50 Kg) Zak 74,000
29 PC.Mortart Tiga Roda (50Kg) Zak 83,000
30 Fuller Kg 3,000
31 Air Liter 30
32 Coral Sikat 3 - 5 Cm M3 225,000
33 Aspal (Aspal Concrete/AC) Kg 15,000
34 Aspal (Medium Curring/MC) Kg 16,500
35 Aspal Emulsi Kg 19,000
36 Aspal Granuler Buton Kg 3,500

B. BAHAN ATAP
No. Uraian Satuan Harga Satuan (Rp) Keterangan
1 Sirap Buah 4,000.00
2 Genteng Metal Deuck M2 96,300.00
3 Genteng Metal Roof Lembar 45,000.00
4 Bubungan Genteng Metal Roof Buah 35,000.00
5 Genteng Lokal Buah 2,000.00
6 Genteng Bubungan Lokal Buah 6,000.00
7 Genteng Beton/Press Buah 13,500.00
8 Genteng Bubungan Beton Buah 1,400.00
9 Genteng Silang/Kodok Buah 1,700.00
10 Genteng Bubungan Silang Buah 5,500.00
11 Genteng Pejaten Buah 1,750.00
12 Genteng Bubungan Pejaten Buah 7,000.00
13 Genteng Kaca Buah 36,000.00
14 Genteng Glazur (Kw I ) Buah 33,000.00
15 Genteng Bubungan Glazur (Kw I ) Buah 42,000.00
16 Genteng Glazur (Kw II ) Buah 29,000.00
17 Genteng Bubungan Glazur (Kw II ) Buah 46,000.00
18 Ijuk Atap Kg 17,500.00
19 Ijuk Bronjong Kg 12,500.00
20 Asbes Type Genteng (Tyluq) Lembar 60,000.00
21 Asbes Gelombang Kecil Lembar 40,000.00
22 Asbes Gelombang Besar Lembar 50,000.00
23 Asbes Bubungan Gelomb. Kecil Lembar 40,150.00
24 Asbes bubungan Gelomb. Besar Lembar 44,275.00
25 Seng Gelombang Besar BJLS 20 Lembar 57,000.00
26 Seng Gelombang Besar BJLS 25 Lembar 66,000.00
27 Seng Gelombang Besar BJLS 30 Lembar 84,500.00
28 Seng Gelombang Kecil BJLS 20 Lembar 55,000.00
29 Seng Plastik BJLS 20 M' 63,800.00
30 Seng Plat BJLS 25 M' 67,500.00
31 Seng Plat BJLS 30 M' 80,000.00
32 Karet Talang M' 165,000.00
33 Polycarbonate 9 mm M2 195,000.00
C. BAHAN KAYU
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Papan Kayu Kls I M3 7,000,000
Reng ( 2 x 3 ) cm M3 7,000,000
2 Balok Kayu Kls I M3 6,500,000
Kaso - Kaso ( 5 x 7 ) cm M3 6,500,000
Balok Kayu ( 6 x 12 ) cm M3 6,500,000
3 Papan Kayu Kls II M3 5,000,000
4 Balok Kayu Kls II M3 4,500,000
Kaso - Kaso ( 5 x 7 ) cm M3 4,500,000
Balok Kayu ( 6 x 12 ) cm M3 4,500,000
Reng ( 2 x 3 ) cm M3 4,500,000
5 Papan Kayu Kls III M3 3,000,000
6 Balok Kayu Kls III M3 2,500,000
Kaso - Kaso ( 5 x 7 ) cm M3 2,500,000
Balok Kayu ( 6 x 12 ) cm M3 2,500,000
7 Dolken/Perancah Diameter 10 cm Batang 40,000
Perancah bambu Batang 8,000
8 List Kaca M' 1,750
9 List Profil Kayu M' 15,000
10 Papan Kayu Begisting M3 2,100,000
11 Balok Kayu Begisting M3 2,000,000

D. BAHAN BAMBU
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Bambu Besar ³ 12.5 cm - 6 m Batang 45,000
2 Bambu Sedang ³ 10 cm - 6 m Batang 34,000
3 Bambu Kecil ³ 7cm - 6 m Batang 25,000
4 Bambu Gunung (10 Btg) 4 M M2 47,500
5 Bedek Kulitan M2 75,000
6 Bedek Biasa M2 35,000
E. BAHAN CETAK
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Roster Kecil Buah 7,500
2 Roster Sedang Buah 10,500
3 Roster Besar Buah 12,000
4 Lubang Angin 10 x 20 cm Buah 46,000
5 Lubang Angin 20 x 20 cm Buah 65,000
6 Lubang Angin Batu Alam Buah 122,000
7 Buis Beton Diameter 10 cm Buah 67,000 L = 1m
8 Buis Beton Diameter 20 cm Buah 78,000 L = 1m
9 Buis Beton Diameter 40 cm Buah 93,000 L = 1m
10 Buis Beton Diameter 60 cm Buah 145,000 L = 0.5 m
11 Buis Beton Diameter 80 cm Buah 190,000 L = 0.5 m
12 Batako 10 x 20 x 40 cm Buah 4,600
13 Paving Blok Press Type Bata Biji 1,900
14 Paving Blok Biasa Type Berlian Biji 2,700
15 Kerab Beton / Kanstin Biji 65,000
F. BAHAN LANTAI
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Tegel Abu-abu 20 x 20 cm M2 45,000
2 Tegel Bergaris Abu-abu 20 x 20 cm M2 50,000
3 Tegel Warna 20 x 20 cm M2 48,500
4 Tegel Bergaris Warna 20 x 20 cm M2 55,000
5 Tegel Traso Klas I 30 x 30 cm M2 52,200
6 Tegel Traso Klas II 30 x 30 cm M2 50,500
7 Keramik Dinding Kwalitas I M2 72,000
8 Keramik Dinding Kwalitas II M2 68,000
9 Tegel Keramik Kualitas I M2 95,000
10 Tegel Keramik Kualitas II M2 66,500
11 Keramik Mozaik M2 220,000
12 Keramik Cutting M2 135,000
13 Porselin Kualitas I (Polos) M2 66,000
14 Porselin Kualitas I (motif) M2 75,000
15 Porselin Kualitas II (motif) M2 62,000
16 Marmer Kualitas I M2 500,000
17 Marmer Kualitas II M2 370,000
18 Granit
- Granit Kw I M2 550,000
- Granit Kw II M2 350,000
19 Batu Alam Andesit
- Andesit Biasa M2 167,000
- Andesit Susun sirih M2 197,000
- Andesit Motif M2 212,000
20 Batu alam candi
- Candi Biasa M2 153,000
- Candi Susun Sirih M2 173,000
- Candi Motif M2 315,000
21 Batu alam Palimanan M2 162,000
22 Batu alam Palimanan Motif M2 292,000
23 Batu alam Giring M2 126,000
24 Batu alam Marmo
- Marmo Biasa M2 170,000
Marmo Susun Sirih M2 180,000
Marmo Motif M2 382,000
25 Lampu batu alam kecil Buah 200,000
26 Lampu batu alam Besar Buah 280,000
27 Paving Block Tipe Bata Biji
28 Paving Block Tipe Tiga Berlian Biji

G. BAHAN LOGAM / BESI


Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Besi Beton Ulir Kg 13,000
2 Besi Beton Polos Kg 12,500
3 Besi Siku 70.70.7 mm Kg 115,000
Besi Siku L. 30 x 30 x 3 mm Kg 87,500
Besi Siku L. 50 x 50 x 5 mm Batang 320,000
Besi Siku L. 50 x 50 x 5 mm Batang 320,000
Besi Plat 3 mm ( 1.2 x 2.4 x 0.03 m Lbr 1,025,000
4 Pagar Kawat BRC Tinggi 150 cm M' 500,000
5 Pagar Kawat BRC Tinggi 90 cm M' 450,000
Pintu Pagar BRC 150 x300 Cm Unit 1,575,000
Pintu Pagar BRC Tinggi 90 x 300 C Unit 945,000
6 Besi Profil/WF Kg 28,000
Baja WF Kg 21,000
Besi Strausse /Rangka Atap M2
Besi Strausse /Rangka Plafond Baja Ringan M2
Besi hollow frame 4 x 0.4 x 400 cm M2 35,000
Besi hollow frame 2 x 0.4 x 400 cm M2 30,000
7 Plat Baja Tebal 2 mm Lbr 696,000
Plat Baja Tebal 3 mm Lbr 967,000
8 Besi Canal C Kg 22,000
9 Kawat Ikat Beton Kg 25,000
Kawat Kasa 38,000
10 Kawat Nyamuk Besi M2 41,000
11 Kawat Nyamuk Plastik M2 19,000
12 Kawat Saringan Pasir M2 30,000
13 Kawat Duri ( 50 mm ) Rol 73,000
14 Kawat Las Harmoni Dus 132,500
15 Kawat Bronjong Digalvanisir 3 mm Kg 25,000
16 Kawat Bronjong Digalvanisir 4 mm Kg 29,000
17 Kawat Bronjong Pabrikan (2.70 mm Lbr (1 M3) 500,000
18 Baja Bergelombang Kg 16,000
19 Baja Struktur Kg 44,000
20 Baja Prategang Kg 44,000

H. BAHAN LANGIT-LANGIT
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Eternit 100 x 100 cm Lembar 23,000
2 Tripleks 120 x 240 x 2 mm Lembar 38,500
3 Tripleks 120 x 240 x 3 mm Lembar 52,000
4 Tripleks 120 x 240 x 6 mm Lembar 85,000
5 Tripleks 120 x 240 x 9 mm Lembar 125,000
6 Tripleks 120 x 240 x 12 mm Lembar 175,000
7 Tripleks 120 x 240 x 18 mm Lembar 260,000
8 Panel Gipsum (6mm x 122 x 242 c Lembar 70,000
9 Teakwood 120 x 240 x 3 mm Lembar 100,000
10 Formika Putih 120 x 240 x 2 mm Lembar 110,000
11 Formika Warna 120 x 240 x 3 mm Lembar 120,000
12 Lem Kayu Kg 30,000

I. BAHAN KACA
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Kaca Polos 3 mm M2 78,000
2 Kaca Polos 5 mm M2 110,000
3 Kaca Riben 3 mm M2 98,000
4 Kaca Riben 5 mm M2 118,000
5 Kerangka Nako 5 mm M2 120,000
6 Kaca Dop/Kaca Es M2 65,000
7 Kaca Pateri/Motif M2 300,000
8 Glass Block Buah 52,000

J. BAHAN FINISHING
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Amplas Kayu Lembar 5,000
2 Plamir Kayu Kg 23,000
3 Spritus Liter 16,000
4 Minyak Cat Liter 23,000
5 Minyak Cat A Spesial Liter 25,000
6 Residu Liter 17,500
7 Teak Oil Liter 47,000
8 Meni Besi Kg 25,000
9 Meni Kayu Kg 25,000
10 Cat Kayu Mutu Menengah Kg 40,500
11 Cat Kayu Mutu Tinggi Kg 50,500
12 Cat Tmbk Mutu Menengah Kg 31,000
13 Cat Tmbk Mutu Tinggi Kg 47,000
14 Cat Besi Kg 55,000
15 Cat Genteng Kg 51,500
16 Plamir Tembok Kg 20,000
17 Teer Kg 10,000
18 Politur Liter 47,000
19 Cat Marka Jalan Scalato Kg 72,500
20 Cat Marka Jalan Biasa Kg 71,000
21 Kuas Kecil Buah 14,000
Kuas sedang Buah 16,000
Kuas Besar Buah 18,500
22 Cairan Pengupas Cat Kg 192,000
23 Cairan Pengeras Cat (Hardner) Kg 176,000
24 Politur Dasar Liter 47,000
25 List Kayu M' 12,000
26 Rol Cat Buah 27,000
K. BAHAN SANITAIRE
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Kloset Duduk KW 1 + Acc Buah 3,500,000
Kloset Duduk KW 2 + Acc Buah 3,000,000
2 Kloset Jongkok Teraso Buah 110,000
Kloset Jongkok Plastik Buah 80,000
3 Kloset Jongkok Porselen KW 1 Buah 200,000
Kloset Jongkok Porselen KW 2 Buah 155,000
4 Wastafel KW 1 Buah 600,000
Wastafel KW 2 Buah 360,000
5 Urinoir Porselen KW 1 Buah 1,500,000
Urinoir Porselen KW 2 Buah 400,000
6 Saringan Air Besi Buah 30,000
7 Saringan Air Plastik Buah 10,000
8 Bak Cuci Piring Teraso Buah 355,000
9 Bak Cuci Piring Logam Buah 320,000
10 Reservoir Fiberglass Kap. 1 m3 Buah 1,904,000
11 Septic Tank Kapasitas 1 m3 Buah 3,000,000
12 Septic Tank Kapasitas 2 m3 Buah
13 Bak Fiberglass Kap. 0.5 m3 Buah 650,000
14 Bak Mandi Plastik Kap. 0.5 m3 Buah 295,000
15 Bak Mandi Teraso Kap. 50x50 cm Buah 315,000
16 Kran Air 3/4" KW I Buah 41,000
17 Kran Air 3/4" KW II Buah 37,000
18 Kran Air 1/2" KW I Buah 25,000
19 Kran Air 1/2" KW II Buah 21,500
20 Shower KW 1 Buah 350,000
21 Shower Kw 2 Buah 200,000

L. BAHAN PAKU
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Paku Panjang 1 - 3 cm Kg 21,000
2 Paku Panjang 4 - 6 cm Kg 21,000
3 Paku Panjang 7 - 12 cm Kg 21,000
4 Paku Seng Kg 26,000
5 Paku Asbes Buah 34,000
6 Sekrup/Piles 1.5 cm Doz 15,000
7 Sekrup/Piles 2.0 cm Doz 28,500
8 Paku Sumbat Buah 1,700
9 Besi Beugel/Baut (Kuda-kuda) Kg 32,000
10 Paku Anti Karat Kg 35,000

M. BAHAN INSTALASI LISTRIK


Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Titik Lampu Buah 150,000
2 Stop Kontak Tanam Buah 50,000
3 Stop Kontak Luar Buah 20,000
4 Saklar Engkel ( Setara Philip ) Buah 15,000
5 Saklar Ganda ( Setara Philip ) Buah 20,000
6 Zakering Boxes 1 Group Buah 225,000
7 Zakering Boxes 2 Group Buah 240,000
8 Zakering Boxes 3 Group Buah 255,000
9 Lampu Pijar
10 Watt (Philips) Buah 12,500
15, 25 dan 40 Watt (Philips) Buah 14,500
60, 75 dan 100 Watt (Philips) Buah 15,000
Jenis Cabe 25 Watt (Philips) Buah 18,000
10 Lampu TL
10 Watt (Philips) Buah 45,000
20 Watt (Philips) Buah 70,000
2 x 20 Watt (Philips) Buah 95,000
40 Watt (Philips) Buah 100,000
11 Lampu Circle
20 Watt (Philips) Buah 71,000
32 Watt (Philips) Buah
13 Lampu Spot Light 220 Volt
100 Watt (Philips) Buah 145,000
150 Watt (Philips) Buah 172,000
Lampu Hallogen 220 Volt
500 Watt (Philips) Buah 100,000
1000 Watt (Philips) Buah 245,000
14 Lampu Taman + Acc Buah 185,000
15 MCB
10 - 16 A (BBC) Buah 42,500
25 - 35 A (BBC) Buah 49,500
63 A (BBC) Buah 370,000
16 Magnetic Switch (Philips) Buah 640,000
17 Fitting
Tempel Buah 16,000
Gantung Buah 10,000
18 Kabel
Senur NYM Uk. 2.5 (Olimpyc) M' 4,500
NYM Uk. 2 x 2.5 (LKM) M' 12,500
NYM Uk. 2 x 4.0 (LKM) M' 7,500
NYM Uk. 4 x 4.0 (LKM) M' 14,000
NYM Uk. 3 x 2.5 (LKM) M' 16,500
NYM Uk. 4 x 6.0 (LKM) M' 25,500
NYM Uk. 4 x 10 (LKM) M' 32,500
19 Connector RJ-45 (AMP/Orang) Buah 25,000
20 Instalasi Workstation Titik 200,000
21 Listrik Penerangan Jalan
Lampu Merkuri (HPL) 250 Watt Buah 210,000
Lampu HPIT 400 Watt Buah 565,000
Lampu Halogen 300 Watt Buah 165,000
22 Photo Cell Selcom (3 - 6 A) Buah 225,000
23 Ornamen Lampu
Pipa Galvanis Diameter 3/4" Buah 182,000
Pipa Galvanis Diameter 1" Buah 231,000
Pipa Galvanis Diameter 1.5" Buah 319,000
Pipa Galvanis Diameter 2" Buah 412,000
24 Kap Lampu
Kap Lampu Terbuka 250 Watt Buah 167,000
Kap Lampu Tertutup 250 Watt Buah 177,000
25 Tiang Lampu Jalan
Tiang Lampu RS 9 Buah 192,000
Tiang Lampu RS 7 Buah 1,153,500

N. BAHAN TAMBAHAN
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Aspal (AC) Kg
2 Kayu Bakar m3 260,000
3 Oli SAE 30 Liter 29,500
4 Oli SAE 40 Liter 30,600
5 Oli SAE 90 Liter 35,000
6 Oli SAE 100 Liter 39,000
7 Aspal Emulsi Kg
8 Flux Oil Liter 30,000
9 Alat Bantu Bina Marga Set 65,000
10 Alat Bantu Pengairan Set 65,000
11 Alat Bantu Bangunan Set 100,000
12 Alat Bantu Perpipaan Set 105,000
13 Sambungan Rumah 1/2" Set
14 Sambungan Rumah 3/4" Set
15 Sambungan Rumah 1" Set
16 Solar Untuk Industri Liter 16,800
17 Solar Untuk Rumah Tangga Liter 5,500
18 Bensin Liter 13,160
19 Minyak Tanah Liter

O. BAHAN PIPA
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
PIPA
1 Pipa GIP Diameter 1" m' 42,500
2 Pipa GIP Diameter 1.5" m' 47,500
3 Pipa GIP Diameter 2" m' 53,750
4 Pipa GIP Diameter 3" m' 87,500
5 Pipa GIP Diameter 4" m' 102,500
6 Pipa GIP Diameter 6" m' 200,000
7 Pipa GIP Diameter 8" m' 500,000
8 Pipa GIP Diameter 10" m' 700,000
9 Pipa GIP Diameter 12" m' 900,000
10 Pipa ACP Diameter 6" m' 192,400
11 Pipa ACP Diameter 8" m' 293,000
12 Pipa ACP Diameter 10" m' 368,300
13 Pipa ACP Diameter 12" m' 554,100
Pipa PVC Type S 12,5
14 Pipa PVC Diameter 1" m' 9,000
15 Pipa PVC Diameter 1.5" m' 21,300
16 Pipa PVC Diameter 2" m' 31,000
17 Pipa PVC Diameter 3" m' 63,000
18 Pipa PVC Diameter 4" m' 93,000
19 Pipa PVC Diameter 6" m' 200,000
20 Pipa PVC Diameter 8" m' 320,000
21 Pipa PVC Diameter 10" m' 500,000
22 Pipa PVC Diameter 12" m' 800,000
23 Pipa PVC Diameter 14" m' 980,000
24 Pipa PVC Diameter 16" m' 1,350,000
Pipa PVC Type AW
25 Pipa AW Diameter 1/2" m' 6,250
26 Pipa AW Diameter 3/4" m' 8,100
27 Pipa AW Diameter 1" m' 10,000
28 Pipa AW Diameter 1,5" m' 11,500
29 Pipa AW Diameter 2" m' 17,000
30 Pipa AW Diameter 3" m' 27,500
31 Pipa AW Diameter 4" m' 40,000
32 Pipa AW Diameter 6" m' 80,000
33 Pipa AW Diameter 8" m' 115,000

ACCESSORIES
A. Tee All Socket PVC (RRJ)
1 DN 200 x 200 mm Buah
2 DN 200 x 150 mm Buah
3 DN 200 x 100 mm Buah
4 DN 200 x 75 mm Buah
5 DN 200 x 50 mm Buah
6 DN 150 x 150 mm Buah
7 DN 150 x 100 mm Buah
8 DN 150 x 75 mm Buah
9 DN 150 x 50 mm Buah
10 DN 100 x 100 mm Buah
11 DN 100 x 75 mm Buah
12 DN 100 x 50 mm Buah
13 DN 75 x 75 mm Buah
14 DN 75 x 50 mm Buah
15 DN 50 x 50 mm Buah

B. Bend Socket Spigot PVC (RRJ)


1 DN 200 - 90° Buah -
2 DN 200 - 45° Buah -
3 DN 150 - 90° Buah -
4 DN 150 - 45° Buah -
5 DN 100 - 90° Buah -
6 DN 100 - 45° Buah -
7 DN 75 - 90° Buah -
8 DN 75 - 45° Buah -
9 DN 50 - 90° Buah -
10 DN 50 - 45° Buah -

C. Reducer Double Socket Spigot PVC (RRJ)


1 DN 200 x 200 mm Buah -
2 DN 200 x 150 mm Buah -
3 DN 150 x 100 mm Buah -
4 DN 150 x 90 mm Buah -
5 DN 100 x 75 mm Buah -
6 DN 100 x 50 mm Buah -
7 DN 75 x 50 mm Buah -

D. Water Meter Flange


1 DN. 300 mm Buah -
2 DN. 250 mm Buah -
3 DN. 200 mm Buah -
4 DN. 150 mm Buah -
5 DN. 100 mm Buah -
6 DN. 75 mm Buah -
7 DN. 50 mm Buah -

E. Flange Socket PVC (RRJ)


1 DN. 350 mm (For Steel) Buah -
2 DN. 300 mm (For PVC) Buah -
3 DN. 250 mm (For PVC) Buah -
4 DN. 200 mm (For PVC) Buah -
5 DN. 150 mm (For PVC) Buah -
6 DN. 100 mm Buah -
7 DN. 75 mm Buah -
8 DN. 50 mm Buah -

F. Cap/Drop PVC (SCJ)


1 DN. 150 mm Buah -
2 DN. 100 mm Buah -
3 DN. 75 mm Buah -
4 DN. 50 mm Buah -

G. Cap/Drop PVC (PVC)


1 DN. 150 mm Buah -
2 DN. 100 mm Buah -
3 DN. 75 mm Buah -
4 DN. 50 mm Buah -

H. All Flange Bend GI


1 DN 350 - 90° Buah -
2 DN 350 - 45° Buah -
3 DN 350 - 22.5° Buah -
4 DN 350 - 11.5° Buah -
5 DN 300 - 90° Buah -
6 DN 300 - 45° Buah -
7 DN 300 - 22.5° Buah -
8 DN 300 - 11.5° Buah -
9 DN 250 - 90° Buah -
10 DN 250 - 45° Buah -
11 DN 200 - 90° Buah -
12 DN 200 - 45° Buah -
13 DN 200 - 22.5° Buah -
14 DN 150 - 90° Buah -
15 DN 150 - 45° Buah -

H. All Flange Tee CI


1 - DN 300 x 300 mm Buah -
2 - DN 250 x 250 mm Buah -
3 - DN 250 x 150 mm Buah -
4 - DN 250 x 100 mm Buah -
5 - DN 200 x 200 mm Buah -
6 - DN 200 x 75 mm Buah -
7 - DN 200 x 50 mm Buah -
8 - DN 150 x 150 mm Buah -
9 - DN 150 x 100 mm Buah -
10 - DN 150 x 75 mm Buah -
11 - DN 150 x 50 mm Buah -

I. All Flange Reducer CI


1 - DN 300 x 300 mm Buah -
2 - DN 300 x 250 mm Buah -
3 - DN 300 x 200 mm Buah -
4 - DN 250 x 200 mm Buah -
5 - DN 250 x 150 mm Buah -
6 - DN 200 x 100 mm Buah -
7 - DN 200 x 75 mm Buah -
8 - DN 200 x 50 mm Buah -
9 - DN 150 x 100 mm Buah -

J. Flange Spigot CI For ACP


1 - DN 250 mm Buah -
2 - DN 200 mm Buah -
3 - DN 150 mm Buah -

K. Dresseer Joint CI For Steel/PVC/ACP


1 - DN. 350 mm (For Steel) Buah -
2 - DN. 300 mm (For PVC) Buah -
3 - DN. 250 mm (For PVC) Buah -
4 - DN. 200 mm (For PVC) Buah -
5 - DN. 150 mm (For PVC) Buah -
6 - DN. 100 mm (For PVC) Buah -
7 - DN. 75 mm (For PVC) Buah -
8 - DN. 65 mm (For PVC) Buah -
9 - DN. 50 mm (For PVC) Buah -
10 - DN. 250 mm (For ACP) Buah -
11 - DN. 200 mm (For ACP) Buah -
12 - DN. 150 mm (For ACP) Buah -

L. Flange Bend CI
1 - DN 250 mm Buah -
2 - DN 150 mm Buah -
3 - DN 75 mm Buah -

M. Air Valve
1 - DN 75 mm Buah -
2 - DN 50 mm Buah -
3 - DN 25 mm Buah -

N. Clame Sadle CI For PVC Pipe


1 - DN 350 x 75 mm Buah -
2 - DN 250 x 75 mm Buah -
3 - DN 200 x 75 mm Buah -
4 - DN 150 x 75 mm Buah -
5 - DN 200 x 50 mm Buah -
6 - DN 150 x 50 mm Buah -
7 - DN 150 x 25 mm Buah -
8 - DN 100 x 25 mm Buah -
9 - DN 75 x 25 mm Buah -
10 - DN 50 x 25 mm Buah -

O. Flange Spigot CI For PVC


1 - DN 250 mm Buah -
2 - DN 200 mm Buah -
3 - DN 150 mm Buah -
4 - DN 100 mm Buah -
5 - DN 75 mm Buah -
6 - DN 50 mm Buah -

P. Street Box (Valve Box)


1 - DN. 350 mm Buah -
2 - DN. 300 mm Buah -
3 - DN. 250 mm Buah -
4 - DN. 200 mm Buah -
5 - DN. 150 mm Buah -
6 - DN. 100 mm Buah -
7 - DN. 75 mm Buah -

Q. Lubricant/Pelumas Kali -

R. All Flange Gate Valve PN 10


1 - DN. 350 mm Buah -
2 - DN. 300 mm Buah -
3 - DN. 250 mm Buah -
4 - DN. 200 mm Buah -
5 - DN. 150 mm Buah -
6 - DN. 100 mm Buah -
7 - DN. 75 mm Buah -
8 - DN. 50 mm Buah -

S. Pengetesan Pipa
1 - DN. 300 mm Buah -
2 - DN. 250 mm Buah -
3 - DN. 200 mm Buah -
4 - DN. 150 mm Buah -
5 - DN. 100 mm Buah -
6 - DN. 75 mm Buah -
7 - DN. 50 mm Buah -

T. Pengetesan Pipa
1 - DN. 300 mm Buah -
2 - DN. 250 mm Buah -
3 - DN. 200 mm Buah -
4 - DN. 150 mm Buah -
5 - DN. 100 mm Buah -
6 - DN. 75 mm Buah -
7 - DN. 50 mm Buah -

U. Lain-lain
1 Filter Oli Buah -
2 Filter Udara Buah -
3 Filter Solar Buah -
4 Rubbet Cople ST. 038 Buah -
5 Rubbet Cople H. 110 Buah -
6 Rubbet Cople Bulat Buah -
7 Rubbet Cople H Buah -
8 Kaporit Kadar 60% Kg -
9 Lem Pipa Kg 140,000.00
10 Seltip Kecil Bh 2,500.00

O. BAHAN PENGUNCI
Harga Satuan
No. Uraian Satuan Keterangan
(Rp)
1 Kunci Pintu 1 Slag KW I Buah 160,000.00
2 Kunci Pintu 1 Slag KW II Buah 130,000.00
3 Kunci Pintu 2 Slag KW I Buah 180,000.00
4 Kunci Pintu 2 Slag KW II Buah 110,000.00
5 Handle KW I Buah 320,000.00
6 Handle KW II Buah 110,000.00
7 Haag Angin Besar Buah 15,000.00
8 Haag Angin Kecil Buah 8,000.00
9 Grendel Besar Buah 22,000.00
10 Grendel Kecil Buah 8,000.00
11 Engsel Nylon Set 14,500.00
12 Engsel Kupu-kupu Set 12,000.00
13 Engsel H Buah 9,000.00
14 Expagnolet Buah 68,000.00

PERALATAN
1 Gunting Taman Kecil Buah -
2 Cetok Buah -
3 Sapu Lidi Buah -
4 Cikrak Buah -
5 Selang Hisap Diameter 2" M' -
6 Selang Hisap Diameter 3" M' -
7 Selang Buang M' -
8 Sumur Tancap PVC M' -

1 Playwood 4 MM Lbr -
2 Panel Beton Pracetak etr -
3 Kolom Beton Pracetak Btg -
4 Strorox Kg 255,000.00
5 Waterstop m 80,000.00
6 Minyak Begisting etr 42,000.00
7 Penjaga Jarak Bekistig/Spacer Bh 45,000.00
8 Besi Hollow 30-50,3 Kg -
9 Phenol Flm 12mm Ltr -
10 Dinabolt dia 12mm (10-15cm) Bh 3,000.00
11 Besi Profil Kg 18,400.00
12 Besi Baja IWF Kg 19,000.00
13 Besi siku L 30-30,3 Kg 40,700.00
14 Besi Plat Baja Kg 45,000.00
15 Kawat Las Listrik Kg 33,000.00
16 Besi Stip Baja Kg 18,040.00
17 Besi Scuare Tube m 6,000.00
18 Besi Lis kaca(1x1)cm m 260,000.00
19 Penjelasan cm -
20 Pintu Gulung Besi(Rolling Door) m2 570,000.00
21 Pintu Lipat (Folding door) m2 1,000,000.00
22 Suns Creen allumunium m2 352,000.00
23 Rolling door alumunium m2 520,000.00
24 Profil alumunium M 60,000.00
25 Skrup Fixer Biji 250.00
26 Sealant Tube 35,000.00
27 Alumunium Strip m 30,000.00
28 Pintu alumunium Buah 850,000.00
29 Venetions blinnds m2 120,000.00
30 Vertical Blinds ( tirai ) m2 120,000.00
31 Baja Strip (0,2x2 ) cm Kg 18,040.00
32 Rangka metal hollow 40 40.2mm m 22,500.00
33 Kapur Padam m3 -
34 HB - 20 m3 800.00
35 HB - 15 m3 800.00
36 HB - 10 m3 800.00
37 Bata Roster m3 -
38 Bata Berongga m3 -
39 Batu Granit bh 11,440.00
40 Ubin Teralux Marmer bh -
41 Plint Ubin Pc bh -
42 Plint Ubin Granit bh -
43 Plint Ubin Traso bh -
44 Plint Ubin Teralux kerang bh 206,000.00
45 Plint ubin Teralux marmer bh 269,600.00
46 Interval Cove bh -
47 Karpet bh 94,380.00
48 Underlayer m2 101,640.00
49 Parguet m2 130,680.00
50 Porslen bh 1,200.00
51 Batu paras bh 65,400.00
52 Batu temple hitam bh 2,500.00
53 Vynil bh 108,900.00
54 Wallpaper m -
55 Floor Haiderner kg -
56 Akuistik lbr -
57 Gypsum Board lbr 68,400.00
58 Profil allum T m -
59 Ramset bh -
60 Rooflight 90 x 180 ltr -
61 Plastic aeratur bh -
62 Asbes Gelombang Uk 92 x 250 cm lbr 65,000.00
63 C.75, 100 m 12,500.00
64 C.75, 75 m 11,000.00
65 Reng m 6,000.00
66 Baut (screw drive) m 1,050.00
67 Dynabolt m 4,000.00
68 Plat Blancing m 30,000.00
HARGA SATUAN UPAH
TAHUN ANGGARAN 2015
No Uraian Satuan Harga Satuan (Rp) Keterangan
1 Buruh Tak Terampil OH 60,000
2 Buruh Semi Terampil OH 70,000
3 Buruh Terampil OH 75,000
4 Pekerja OH 70,000
5 Mandor OH 50,000
6 Tukang Batu OH 110,000
7 Kepala Tukang Batu OH 115,000
8 Kepala Profil Batu / Kayu OH 125,000
9 Tukang Kayu OH 110,000
10 Kepala Tukang Kayu OH 115,000
11 Tukang Besi Beton OH 110,000
12 Kepala Tukang Besi Beton OH 115,000
13 Tukang Las OH 110,000
14 Kepala Tukang Las OH 115,000
15 Tukang Politur OH 110,000
16 Tukang Cat OH 115,000
17 Kepala Tukang Cat OH 110,000
18 Kepala Tukang Pipa OH 115,000
19 Tukang Pipa OH 110,000
20 Pemecah Batu OH 65,000
21 Jaga Malam OH 65,000
22 Penggergaji OH 65,000
23 Penggosok Tegel OH 60,000
24 Pengisi Bronjong OH 55,500
25 Penganyam Bronjong OH 62,500
26 Kepala Penganyam Bronjong OH 65,000
27 Pemasak Aspal OH 65,000
28 Sopir OH 95,000
29 Pembantu Sopir OH 62,500
30 Mekanik OH 100,000
31 Mekanik Pembantu OH 72,500
32 Operator Alat Ringan OH 95,000
33 Operator Alat Berat Terampil OH 125,000
34 Operator Alat Berat Semi Teramp OH 105,000
35 Pembantu Operator OH 75,000
36 Operator Pompa TL OH 70,000
37 Tukang Listrik OH 90,000
38 Kepala Tukang Listrik OH 95,000
39 Sopir Material OH 95,000
2,009
RENCANA ANGGARAN BIAYA
(RAB)

KEGIATAN : PEMBANGUNAN RUANGAN KELAS


PEKERJAAN : PEMBANGUNAN RUANGAN KELAS BARU SDN 9 SILA ( 2 RKB )
LOKASI : KECAMATAN BOLO
SUMBER DANA : DAK
TAHUN ANGGARAN : 2014

No. Uraian Pekerjaan Volume Satuan

1 2 3 4

A. GEDUNG RUANG KELAS

I PEKERJAAN PENDAHULUAN
1 Papan Nama Kegiatan 1.00 Unit
2 Pengukuran dan Pemasangan Bowplank 1.00 Pkt

II PEKERJAAN TANAH
1 Galian Tanah 24.66 M³
2 Urugan Kembali 8.14 M³
3 Urugan Tanah Di Bawah Lantai Dipadatkan 16.26 M³
4 Urugan Pasir Di Pondasi Dan Bawah Lantai 7.20 M³

III PEKERJAAN PASANGAN


1 Memasang Pondasi Batu Kosong 6.48 M³
2 Memasang Pondasi Batu Kali 1Pc : 5Ps 16.53 M³
3 Pas. Bata Merah 1 Pc : 2 Psr ( Trasram ) 5.80 M²
4 Pas. Bata Merah 1 Pc : 5 Psr 111.01 M²

IV PEKERJAAN BETON
1 Pembesian Dengan Besi Beton Polos / Ulir 246.32 Kg
2 Beton Sloof 15/20 cm 0.90 M³
3 Beton Kolom Praktis 13/20 cm 0.31 M³
4 Beton Kolom Praktis 13/13 cm 0.51 M³
5 Beton Kolom Teras 20/20 cm 0.17 M³
6 Balok Latei 16.00 M'
7 Ring Balok 38.00 M'
8 Balok Gantung 12.00 M'
9 Memasang Begisting Untuk Sloof 3.96 M²
10 Memasang Begisting Untuk Kolom 5.00 M²
V PEKERJAAN PLESTERAN DAN LANTAI
1 Plesteran Dinding Tebal 15 mm 1Pc : 3Ps 11.60 M²
2 Plesteran Dinding Tebal 15 mm 1Pc : 5Ps + Acian 222.02 M²
3 Memasang Lantai Keramik ( 40x40 ) cm 72.00 M²

VI PEKERJAAN KUSEN/PINTU/JENDELA DAN VENTILASI


1 Memasang Kusen Pintu Dan Jendela + Ventilasi 0.62 M³
2 Memasang Daun Pintu Panel , Kayu Klas II 1.60 M²
3 Memasang Jalusi Kusen, Kayu Klas I I 5.96 M²
4 Memasang Daun Jendela Kaca 5 mm 5.72 M²

VII PEKERJAAN ATAP DAN PLAFOND


1 Memasang Rangka Atap Baja Ringan 108.89 M³
2 Memasang Lisplank ( 3 x 20 ) cm, Kayu Kls II 9.20 M²
3 Memasang Atap Metal Roof 108.89 M²
4 Memasang Bubungan Metal Roof 10.00 M'
5 Memasang Rangka Langit - Langit (60 x 60) cm, Kayu Klas II - M²
6 Memasang Langit - Langit Tripleks - M²
7 Memasang List Langit - Langit Kayu Profil - M'

No. Uraian Pekerjaan Volume Satuan

1 2 3 4

VIII PEKERJAAN PENGECATAN


1 Pengecetan Tembok Baru 186.90 M²
2 Pengecatan Plafond - M²
2 Pengecetan Bidang Kayu Tampak 29.85 M²
3 Pengecetan Permukaan Baja dengan Cat Besi - M²
4 Politur Daun Pintu Dan Jendela 3.20 M²
5 Pelaburan Bidang Kayu Dengan Cat Residu dan Teer - M²

IX. PEKERJAAN PENGUNCI DAN BESI


1 Kunci Tanam 2 Slag 1.00 Bh
2 Engsel Pintu 3.00 Psg
3 Engsel Jendela 22.00 Bh
4 Grendel Pintu 1.00 Bh
5 Grendel Jendela 11.00 Bh
6 Haag Angin 22.00 Psg
7 Angker Kusen 36.00 Bh
8 Memasang Kaca Mati 5 mm 3.12 M²

X. PEKERJAAN INSTALASI LISTRIK


1 Titik Lampu 6.00 Buah
2 Stop Kontak Tanam 1.00 Buah
3 Saklar Engkel ( Setara Philip ) 1.00 Buah
4 Saklar Ganda ( Setara Philip ) 1.00 Buah
5 Fitting Tempel 6.00 Buah
6 Lampu SL 11 Watt (Philips) - Buah
7 Zekering Box 1 Group - Buah

XI. PEKERJAAN LAIN-LAIN


1 Pembersihan Lokasi - Pkt

Total A

B. PENGADAAN PERABOT
1 Kursi Guru 1.00 Buah
2 Meja Guru 1/2 Biro 1.00 Buah
3 Meja Siswa 20.00 Buah
4 Kursi Siswa 20.00 Buah
5 Papan Tulis 1.00 Lembar

Total B
REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN RUANGAN KELAS


PEKERJAAN : PEMBANGUNAN RUANGAN KELAS BARU SDN 9 SILA ( 2 RKB )
LOKASI : KECAMATAN BOLO
SUMBER DANA : DAK
TAHUN ANGGARAN : 2014

No. Uraian Pekerjaan

1 2

A. GEDUNG RUANG KELAS

B. PENGADAAN PERABOT

JUMLAH
PPN ( 10 % )
TOTAL
DIBULATKAN

Terbilang : Seratus Dua Puluh Dua Juta Lima Ratus Ribu Rupiah
Disetujui,
Pejabat Pembuat Komitmen Pendidikan Dasar
Dinas Pendidikan, Pemuda dan Olahraga
Kabupaten Bima

ARSYAD, S.Pd, M.Pd


NIP. 19660707 198803 1 010

Diperiksa,
Kepala Dinas Pekerjaan Umum
Kabupaten Bima

H. Ir. NGGEMPO, M.MT


NIP. 19621221 199003 1 003
GARAN BIAYA
B)

DN 9 SILA ( 2 RKB )

Harga Satuan Jumlah Harga


Kode Analisa
(Rp.) (Rp.)

5 6 7

Ls 150,000.00 150,000.00 0.14


Ls 300,000.00 300,000.00 0.27
450,000.00
-
SNI-DT 91-0006-2007. 1 35,750.00 881,595.00 0.81
SNI-DT 91-0006-2007. 9a 11,916.67 96,975.45 0.09
SNI-DT 91-0006-2007. 15a 73,250.00 1,191,206.15 1.09
SNI-DT 91-0006-2007. 11 110,300.00 794,160.00 0.73
2,963,936.60
-
SNI-DT 91-0007-2007. 9 215,985.00 1,399,582.80 1.28
SNI-DT 91-0007-2007. 3 481,005.00 7,951,012.65 7.28
SNI-DT 91-0009-2007. 7 100,145.00 580,841.00 0.53
SNI-DT 91-0009-2007. 10 88,785.00 9,856,022.85 9.02
19,787,459.30
-
SNI-DT 91-0008-2007. 17 12,969.00 3,194,508.52 2.92
SNI-DT 91-0008-2007. 3 688,689.00 619,820.10 0.57
SNI-DT 91-0008-2007. 6 755,780.00 235,803.36 0.22
SNI-DT 91-0008-2007. 6 755,780.00 388,289.53 0.36
SNI-DT 91-0008-2007. 6 755,780.00 127,726.82
SNI-DT 91-0008-2007. 36 83,025.00 1,328,400.00 1.22
SNI-DT 91-0008-2007. 36 83,025.00 3,154,950.00 2.89
SNI-DT 91-0008-2007. 36 83,025.00 996,300.00
SNI-DT 91-0008-2007. 21 152,050.00 602,118.00 0.55
SNI-DT 91-0008-2007. 22 279,475.00 1,396,480.68 1.28
12,044,397.01
-
SNI-DT 91-0010-2007. 3 41,950.00 486,620.00 0.45
SNI-DT 91-0010-2007. 5 38,855.00 8,626,587.10 7.90
SNI-DT 91-0012-2007. 35b 156,400.00 11,260,800.00 10.31
20,374,007.10
-
SNI-DT 91-0011-2007. 2 5,209,000.00 3,227,663.09 2.95
SNI-DT 91-0011-2007. 5b 467,000.00 747,200.00 0.68
SNI-DT 91-0011-2007. 10b 417,950.00 2,490,982.00 2.28
SNI-DT 91-0011-2007. 6a 382,100.00 2,185,612.00 2.00
8,651,457.09
-
Ls 140,000.00 15,244,488.00 13.95
SNI-DT 91-0011-2007. 21b 55,420.00 509,864.00 0.47
SNI-DT 91-0015-2007. 31 75,038.00 8,170,827.79 7.48
SNI-DT 91-0015-2007. 23 61,385.00 613,850.00 0.56
SNI-DT 91-0011-2007. 20 86,378.00 - -
SNI-DT 91-0013-2007. 5 43,575.00 - 24,029,165.79
SNI-DT 91-0013-2007. 9 18,165.00 - -
24,539,029.79

Harga Satuan Jumlah Harga


Kode Analisa
(Rp.) (Rp.)

5 6 7

-
SNI-DT 91-0018-2007. 14 14,269.00 2,666,819.02 2.44
SNI-DT 91-0018-2007. 14 14,269.00 - -
SNI-DT 91-0018-2007. 8 28,680.00 856,224.19 0.78
SNI-DT 91-0018-2007. 20b 27,250.00 - -
SNI-DT 91-0018-2007. 11 41,204.00 131,852.80 0.12
SNI-DT 91-0018-2007. 12 10,230.00 - -
3,654,896.02
-
Ls 180,000.00 180,000.00 0.16
Ls 14,500.00 43,500.00 0.04
Ls 12,000.00 264,000.00 0.24
Ls 25,000.00 25,000.00 0.02
Ls 9,000.00 99,000.00 0.09
Ls 30,000.00 660,000.00 0.60
Ls 2,500.00 90,000.00 0.08
SNI-DT 91-0017-2007. 17a 142,160.00 443,539.20 0.41
1,805,039.20
-
Ls 140,000.00 840,000.00 0.77
Ls 50,000.00 50,000.00 0.05
Ls 15,000.00 15,000.00 0.01
Ls 20,000.00 20,000.00 0.02
Ls 16,000.00 96,000.00 0.09
Ls 14,500.00 - -
Ls 225,000.00 - -
1,021,000.00
-
Ls 250,000.00 - -
- -

Total A 95,291,222.10

Ls 250,000.00 250,000.00
Ls 400,000.00 400,000.00
Ls 265,000.00 5,300,000.00
Ls 200,000.00 4,000,000.00
Ls 4,000,000.00 4,000,000.00
13,950,000.00

Total B 13,950,000.00
24,029,251.99
NA ANGGARAN BIAYA

RU SDN 9 SILA ( 2 RKB )

Jumlah Harga
(Rp.)
3

Rp. 95,291,222.10 95,291,222.10

Rp. 13,950,000.00

Rp. 109,241,222.10 122,500,000.00


Rp. 10,924,122.21
Rp. 120,165,344.31
Rp. 120,165,000.00 2,335,000.00

Rupiah
Bima, Maret 2014

Dihitung,
Konsultan Perencana
CV. FIBON ARCHITEC

HERMANSYAH, A.Md.T
Direktur

Mengetahui,
Kepala Dinas Pendidikan, Pemuda dan Olahraga
Kabupaten Bima

TAJUDDIN, SH, M. Si
NIP. 19681231 199303 1 120
0.90
0.31
0.51

0.70

2.43
\
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
1 Pengukuran dan Pemasangan Bouwplank

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH


ORANG OH (Rp/Org/Hari)

8 Kepala Profil Batu / Kayu 0.100 125,000.00


4 Pekerja 0.100 70,000.00
9 Tukang Kayu 0.010 110,000.00
5 Mandor 0.005 50,000.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN

83 Balok Kayu ( 6 x 12 ) cm 0.012 M3 6,500,000.00


228 Cat Tmbk Mutu Menengah 0.020 Kg 7,500.00
82 Kaso - Kaso ( 5 x 7 ) cm 0.007 M3 6,500,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY 1.00 M' HARGA SATUAN ( Rp ) 144,500.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


2 Pembersihan Lapangan

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH


ORANG OH (Rp/Org/Hari)

4 Pekerja 0.100 70,000.00


5 Mandor 0.050 50,000.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN

-
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 9,500.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
3 Pembuatan Jalan Sementara

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH


ORANG OH (Rp/Org/Hari)

4 Pekerja 1.000 70,000.00


5 Mandor 0.050 50,000.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN

8 Kerikil Alam 3 - 5 cm 0.150 M3 185,000.00


12 Kerikil Alam 2 - 3 cm 0.090 M3 225,000.00
27 Kapur Pasang 0.010 Kg 3,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 120,530.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


4 Bongkaran Beton Bertulang

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH


ORANG OH (Rp/Org/Hari)

4 Pekerja 6.667 70,000.00


5 Mandor 0.333 50,000.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 483,340.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
5 Bongkaran Dinding Tembok Bata Merah

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH


ORANG OH (Rp/Org/Hari)

4 Pekerja 6.667 70,000.00


5 Mandor 0.033 50,000.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 468,340.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


6 Pasang Pagar Kawat Jaring Galvanis, Tinggi 100

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH


ORANG OH (Rp/Org/Hari)

4 Pekerja 0.042 70,000.00


6 Tukang Batu 0.004 110,000.00
7 Kepala Tukang Batu 0.042 115,000.00
5 Mandor 0.002 50,000.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN

172 Pagar Kawat BRC Tinggi 90 c 0.434 M' 450,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY 1.00 M¹ HARGA SATUAN ( Rp ) 203,610.00
ANALISA BIAYA PEKERJAAN KODE
gukuran dan Pemasangan Bouwplank SNI-DT 91-0005- 144,500.00 M'
2007. 4
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

12,500.00
7,000.00
1,100.00
250.00

SUB JUMLAH ( Rp ) 20,850.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

78,000.00
150.00
45,500.00

SUB JUMLAH ( Rp ) 123,650.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 144,500.00

Per M'

ANALISA BIAYA PEKERJAAN KODE


Pembersihan Lapangan SNI-DT 91-0005- 9,500.00 M²
2007. 8
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

7,000.00
2,500.00

SUB JUMLAH ( Rp ) 9,500.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 9,500.00

Per M²
ANALISA BIAYA PEKERJAAN KODE
Pembuatan Jalan Sementara SNI-DT 91-0005- 120,530.00 M³
2007. 12
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

70,000.00
2,500.00

SUB JUMLAH ( Rp ) 72,500.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

27,750.00
20,250.00
30.00

SUB JUMLAH ( Rp ) 48,030.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 120,530.00

Per M³

ANALISA BIAYA PEKERJAAN KODE


Bongkaran Beton Bertulang SNI-DT 91-0005- 483340 M³
2007. 13
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

466,690.00
16,650.00

SUB JUMLAH ( Rp ) 483,340.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 483,340.00
Per M³
ANALISA BIAYA PEKERJAAN KODE
ngkaran Dinding Tembok Bata Merah SNI-DT 91-0005- 468340 M³
2007. 14
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

466,690.00
1,650.00

SUB JUMLAH ( Rp ) 468,340.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 468,340.00

Per M³

ANALISA BIAYA PEKERJAAN KODE


agar Kawat Jaring Galvanis, Tinggi 100 cm SNI-DT 91-0005- 203,610.00 M¹
2007. 15
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

2,940.00
440.00
4,830.00
100.00

SUB JUMLAH ( Rp ) 8,310.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

195,300.00

SUB JUMLAH ( Rp ) 195,300.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 203,610.00

Per M¹
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
7 Menggali Tanah Biasa Sedalam 1m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.750 70,000.00 52,500.00


1 Buruh Tak Terampil - 60,000.00 -
2 Buruh Semi Terampil - 70,000.00 -
5 Mandor 0.025 50,000.00 1,250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 53,750.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


8 Menggali Tanah Biasa Sedalam 2m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.900 70,000.00 63,000.00


5 Mandor 0.045 50,000.00 2,250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 65,250.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
9 Menggali Tanah Keras Sedalam 1 m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 1.000 70,000.00 70,000.00


5 Mandor 0.032 50,000.00 1,600.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 71,600.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


10 Menggali Tanah Cadas Sedalam 1 m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 1.500 70,000.00 105,000.00


5 Mandor 0.060 50,000.00 3,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
11 Menggali Tanah Lumpur Sedalam 1 m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 1.200 70,000.00 84,000.00


5 Mandor 0.045 50,000.00 2,250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 86,250.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


12 Mengerjakan Stripping Setinggi 1 m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 1.200 70,000.00 84,000.00


5 Mandor 0.045 50,000.00 2,250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 86,250.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
13 Membuang Tanah Sejauh 30 m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.330 70,000.00 23,100.00


5 Mandor 0.010 50,000.00 500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 23,600.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
14 Urugan Kembali Galian Tanah Biasa Sedalam 1 m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.2500 70,000.00 17,500.00


5 Mandor 0.0083 50,000.00 416.67

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 17,916.67 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


15 Urugan Kembali Galian Tanah Biasa Sedalam 2 m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.300 70,000.00 21,000.00


5 Mandor 0.015 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 21,750.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
16 Urugan Kembali Galian Tanah Keras Sedalam 1 m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.333 70,000.00 23,310.00


5 Mandor 0.0107 50,000.00 533.33

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 23,843.33 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


17 Urugan Kembali Galian Tanah Cadas Sedalam 1 m'

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.500 70,000.00 35,000.00


5 Mandor 0.020 50,000.00 1,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 36,000.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
18 Pemadatan Tanah ( Per 20 cm )

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.500 70,000.00 35,000.00


5 Mandor 0.050 50,000.00 2,500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 37,500.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


19 Mengurug dengan Pasir Urug

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.300 70,000.00 21,000.00


5 Mandor 0.010 50,000.00 500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Pasir Urug 1.200 M3 130,000.00 156,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
20 Urugan Sirtu Untuk Lantai Bangunan

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.250 70,000.00 17,500.00


5 Mandor 0.025 50,000.00 1,250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Sirtu 1.200 M3 110,000.00 132,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) ### Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


21 Tanah Urug Biasa

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.250 70,000.00 17,500.00


5 Mandor 0.025 50,000.00 1,250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Tanah Urug Biasa 1.200 M3 65,000.00 78,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 96,750.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
22 Tanah Urug Pilihan

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.250 70,000.00 17,500.00


5 Mandor 0.025 50,000.00 1,250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Tanah Urug Pilihan 1.200 M3 80,000.00 96,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
23 Pemasangan Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.150 70,000.00 10,500.00


5 Mandor 0.015 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Ijuk Bronjong 6.000 Kg 12,500.00 75,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M³ HARGA SATUAN ( Rp ) 86,250.00 Per
KODE
A. 2.3.1.1
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

53,750.00
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )

-
53,750.00

KODE
A. 2.3.1.2
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

65,250.00
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )
-
65,250.00


KODE
A. 3.2.1.4
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

71,600.00
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )

-
71,600.00

KODE
A. 3.2.1.5
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

108,000.00
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )

-
108,000.00


KODE
A. 3.2.1.6
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

86,250.00
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )

-
86,250.00

KODE
A. 3.2.1.7
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

86,250.00
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )

-
86,250.00

KODE
A. 2.3.1.8
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

23,600.00
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )

-
23,600.00


KODE
A. 2.3.1.9.1
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

17,916.67
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )

-
17,916.67

KODE

A. 2.3.1.9.2
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

21,750.00
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )
-
21,750.00


KODE

A. 2.3.1.9.3
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

23,843.33
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )

-
23,843.33

KODE

A. 2.3.1.9.4
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

36,000.00
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )
-
36,000.00


KODE
A. 3.2.1.10
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

37,500.00
SUB TOTAL
( Rp )

-
SUB TOTAL
( Rp )

-
37,500.00

KODE
A. 3.2.1.11
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

21,500.00
SUB TOTAL
( Rp )

156,000.00
SUB TOTAL
( Rp )
-
177,500.00


KODE
A. 3.2.1.15
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

18,750.00
SUB TOTAL
( Rp )

132,000.00
SUB TOTAL
( Rp )

-
150,750.00

KODE
SNI-DT 91-0006-
2007. 15a
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

18,750.00
SUB TOTAL
( Rp )

78,000.00
SUB TOTAL
( Rp )
-
96,750.00


KODE
SNI-DT 91-0006-
2007. 15b
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

18,750.00
SUB TOTAL
( Rp )

96,000.00
SUB TOTAL
( Rp )

-
114,750.00


KODE
A. 3.2.1.14
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

11,250.00
SUB TOTAL
( Rp )

75,000.00
SUB TOTAL
( Rp )

-
86,250.00


53,750.00 M³

65,250.00 M³
71,600.00 M³

108,000.00 M³
108,000.00 M³

108,000.00 M³
108,000.00 M³
17,916.67 M³

21,750.00 M³
23,843.33 M³

36,000.00 M³
37,500.00 M³

177,500.00 M³
150750 M³

96750 M³
114,750.00 M³
86,250.00 M³
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
24 Memasang Pondasi 1Pc : 3Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 1.500 70000 105,000.00


6 Tukang Batu 0.750 110000 82,500.00
7 Kepala Tukang Batu 0.075 115000 8,625.00
5 Mandor 0.075 50000 3,750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

2 Batu Kali Belah 1.200 M3 130,000.00 156,000.00


### PC. Merk Tiga Roda (50 Kg) 4.040 Zak 77,000.00 311,080.00
### Pasir Pasang 0.485 M3 145,000.00 70,325.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 737,280.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


25 Memasang Pondasi Batu Kali 1Pc : 4Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 1.500 70,000.00 105,000.00
6 Tukang Batu 0.750 110,000.00 82,500.00
7 Kepala Tukang Batu 0.075 115,000.00 8,625.00
5 Mandor 0.075 50,000.00 3,750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

2 Batu Kali Belah 1.200 M3 130,000.00 156,000.00


### PC. Merk Tiga Roda (50 Kg) 3.260 Zak 77,000.00 251,020.00
### Pasir Pasang 0.520 M3 145,000.00 75,400.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 682,295.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
26 Memasang Pondasi Batu Kali 1Pc : 5Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 1.500 70,000.00 105,000.00


6 Tukang Batu 0.750 110,000.00 82,500.00
7 Kepala Tukang Batu 0.075 115,000.00 8,625.00
5 Mandor 0.075 50,000.00 3,750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

2 Batu Kali Belah 1.200 M3 130,000.00 156,000.00


### PC. Merk Tiga Roda (50 Kg) 2.720 Zak 77,000.00 209,440.00
### Pasir Pasang 0.544 M3 145,000.00 78,880.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 644,195.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


27 Memasang Pondasi Batu Kali 1Pc : 6Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 1.500 70,000.00 105,000.00
6 Tukang Batu 0.750 110,000.00 82,500.00
7 Kepala Tukang Batu 0.075 115,000.00 8,625.00
5 Mandor 0.075 50,000.00 3,750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
2 Batu Kali Belah 1.200 M3 130,000.00 156,000.00
### PC. Merk Tiga Roda (50 Kg) 2.340 Zak 77,000.00 180,180.00
### Pasir Pasang 0.561 M3 145,000.00 81,345.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 617,400.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
28 Memasang Pondasi Batu Kosong

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.780 70,000.00 54,600.00


6 Tukang Batu 0.390 110,000.00 42,900.00
7 Kepala Tukang Batu 0.039 115,000.00 4,485.00
5 Mandor 0.039 50,000.00 1,950.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

2 Batu Kali Belah 1.200 M3 130,000.00 156,000.00


### Pasir Urug 0.432 M3 130,000.00 56,160.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 316,095.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


29 Memasang Pondasi Sumuran Diameter 100 cm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 2.400 70,000.00 168,000.00


6 Tukang Batu 0.800 110,000.00 88,000.00
7 Kepala Tukang Batu 0.080 115,000.00 9,200.00
5 Mandor 0.119 50,000.00 5,950.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
2 Batu Kali Belah 0.450 M3 130,000.00 58,500.00
### PC. Merk Tiga Roda (50 Kg) 3.880 Zak 77,000.00 298,760.00
### Pasir Beton 0.312 M3 175,000.00 54,600.00
### Kerikil Pecah 2 - 3 cm (MSC) 0.468 M3 255,000.00 119,340.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 802,350.00 Per
KODE
A. 3.2.1.1
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

199,875.00
SUB TOTAL
( Rp )

537,405.00
SUB TOTAL
( Rp )

-
737,280.00

KODE

A. 3.2.1.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

199,875.00
SUB TOTAL
( Rp )

482,420.00
SUB TOTAL
( Rp )

-
682,295.00


KODE

A. 3.2.1.3

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

199,875.00
SUB TOTAL
( Rp )

444,320.00
SUB TOTAL
( Rp )

-
644,195.00

KODE

A. 3.2.1.4
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

199,875.00
SUB TOTAL
( Rp )

417,525.00
SUB TOTAL
( Rp )

-
617,400.00


KODE

A. 3.2.1.9
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

103,935.00
SUB TOTAL
( Rp )

212,160.00
SUB TOTAL
( Rp )

-
316,095.00

KODE

A. 3.2.1.11

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

271,150.00
SUB TOTAL
( Rp )

531,200.00
SUB TOTAL
( Rp )
-
802,350.00


737,280.00 M³

4.04

682,295.00 M³

3.26
644,195.00 M³

2.72

617,400.00 M³

2.34
316,095.00 M³

802,350.00 M³

3.88
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
30 Membuat Beton Mutu ( K.100)

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 1.650 70,000.00 115,500.00


6 Tukang Batu 0.275 110,000.00 30,250.00
7 Kepala Tukang Batu 0.028 115,000.00 3,220.00
5 Mandor 0.083 50,000.00 4,150.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 4.9400 Zak 77,000.00 380,380.00
21 Pasir Beton 0.4697 M3 175,000.00 82,202.70
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6055 M3 255,000.00 154,390.91
40 Air 215.00 Liter 30.00 6,450.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 776,543.61 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


31 Membuat Beton Mutu ( K.125)

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 1.650 70,000.00 115,500.00
6 Tukang Batu 0.275 110,000.00 30,250.00
7 Kepala Tukang Batu 0.028 115,000.00 3,220.00
5 Mandor 0.083 50,000.00 4,150.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 5.5200 Zak 77,000.00 425,040.00
21 Pasir Beton 0.4476 M3 175,000.00 78,330.00
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6130 M3 255,000.00 156,315.00
40 Air 215.00 Liter 30.00 6,450.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 819,255.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
32 Membuat Beton Lantai Kerja Mutu ( K.100)

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 1.200 70,000.00 84,000.00


6 Tukang Batu 0.200 110,000.00 22,000.00
7 Kepala Tukang Batu 0.020 115,000.00 2,300.00
5 Mandor 0.060 50,000.00 3,000.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 4.6000 Zak 77,000.00 354,200.00
21 Pasir Beton 0.4827 M3 175,000.00 84,472.50
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6224 M3 255,000.00 158,712.00
40 Air 200.00 Liter 30.00 6,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 714,684.50 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


33 Membuat Beton Mutu ( K.175)

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 1.650 70,000.00 115,500.00
6 Tukang Batu 0.275 110,000.00 30,250.00
7 Kepala Tukang Batu 0.028 115,000.00 3,220.00
5 Mandor 0.083 50,000.00 4,150.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 6.5200 Zak 77,000.00 502,040.00
21 Pasir Beton 0.4108 M3 175,000.00 71,890.00
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6236 M3 255,000.00 159,018.00
40 Air 215.00 Liter 30.00 6,450.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 892,518.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
34 Membuat Beton Mutu ( K.225)

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 1.6500 70,000.00 115,500.00
6 Tukang Batu 0.2750 110,000.00 30,250.00
7 Kepala Tukang Batu 0.0280 115,000.00 3,220.00
5 Mandor 0.0830 50,000.00 4,150.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 7.4200 Zak 77,000.00 571,340.00
21 Pasir Beton 0.3773 M3 175,000.00 66,027.50
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6345 M3 255,000.00 161,797.50
40 Air 215.00 Liter 30.00 6,450.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 958,735.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


35 Membuat Beton Mutu ( K.250)

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 1.6500 70,000.00 115,500.00
6 Tukang Batu 0.2750 110,000.00 30,250.00
7 Kepala Tukang Batu 0.0280 115,000.00 3,220.00
5 Mandor 0.0830 50,000.00 4,150.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 7.6800 Zak 77,000.00 591,360.00
21 Pasir Beton 0.3741 M3 175,000.00 65,467.50
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6297 M3 255,000.00 160,573.50
40 Air 215.00 Liter 30.00 6,450.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 976,971.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
36 Membuat Beton Mutu ( K.275)

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 1.6500 70,000.00 115,500.00
6 Tukang Batu 0.2750 110,000.00 30,250.00
7 Kepala Tukang Batu 0.0280 115,000.00 3,220.00
5 Mandor 0.0830 50,000.00 4,150.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 8.1200 Zak 77,000.00 625,240.00
21 Pasir Beton 0.3697 M3 175,000.00 64,697.50
15 Kerikil Pecah 2 - 3 cm (MSC) 0.6218 M3 255,000.00 158,559.00
40 Air 215.00 Liter 30.00 6,450.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) ### Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


37 Pembesian Dengan Besi Beton Polos / Ulir

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.0070 70,000.00 490.00
11 Tukang Besi Beton 0.0070 110,000.00 770.00
12 Kepala Tukang Besi Beton 0.0007 115,000.00 80.50
5 Mandor 0.0004 50,000.00 20.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
### Besi Beton Polos 1.0500 Kg 12,500.00 13,125.00
### Kawat Ikat Beton 0.0150 Kg 25,000.00 375.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Kg HARGA SATUAN ( Rp ) 14,860.50 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
38 Memasang Begisting Untuk Pondasi

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.5200 70,000.00 36,400.00
9 Tukang Kayu 0.2600 110,000.00 28,600.00
10 Kepala Tukang Kayu 0.0260 115,000.00 2,990.00
5 Mandor 0.0260 50,000.00 1,300.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

89 Papan Kayu Kls III 0.0400 M3 3,000,000.00 120,000.00


### Paku Panjang 4 - 6 cm 0.3000 Kg 21,000.00 6,300.00
### Teak Oil 0.1000 Liter 47,000.00 4,700.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 200,290.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


39 Memasang Begisting Untuk Sloof

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.5200 70,000.00 36,400.00
9 Tukang Kayu 0.2600 110,000.00 28,600.00
10 Kepala Tukang Kayu 0.0260 115,000.00 2,990.00
5 Mandor 0.0260 50,000.00 1,300.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0450 M3 3,000,000.00 135,000.00
### Paku Panjang 7 - 12 cm 0.3000 Kg 21,000.00 6,300.00
### Teak Oil 0.1000 Liter 47,000.00 4,700.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 215,290.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
40 Memasang Begisting Untuk Kolom

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.6600 70,000.00 46,200.00
9 Tukang Kayu 0.3300 110,000.00 36,300.00
10 Kepala Tukang Kayu 0.0330 115,000.00 3,795.00
5 Mandor 0.0330 50,000.00 1,650.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0400 M3 3,000,000.00 120,000.00
### Paku Panjang 7 - 12 cm 0.4000 Kg 21,000.00 8,400.00
### Teak Oil 0.2000 Liter 47,000.00 9,400.00
85 Balok Kayu Kls II 0.0150 M3 4,500,000.00 67,500.00
### Tripleks 120 x 240 x 9 mm 0.3500 Lembar 125,000.00 43,750.00
93 Dolken/Perancah Diameter 10 2.0000 Batang 40,000.00 80,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 416,995.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


41 Memasang Begisting Untuk Balok

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.6600 70,000.00 46,200.00
9 Tukang Kayu 0.3300 110,000.00 36,300.00
10 Kepala Tukang Kayu 0.0330 115,000.00 3,795.00
5 Mandor 0.0330 50,000.00 1,650.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0400 M3 3,000,000.00 120,000.00
### Paku Panjang 7 - 12 cm 0.4000 Kg 21,000.00 8,400.00
### Teak Oil 0.2000 Liter 47,000.00 9,400.00
85 Balok Kayu Kls II 0.0180 M3 4,500,000.00 81,000.00
### Tripleks 120 x 240 x 9 mm 0.3500 Lembar 125,000.00 43,750.00
93 Dolken/Perancah Diameter 10 2.0000 Batang 40,000.00 80,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 430,495.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
42 Memasang Begisting Untuk Lantai

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.6600 70,000.00 46,200.00
9 Tukang Kayu 0.3300 110,000.00 36,300.00
10 Kepala Tukang Kayu 0.0330 115,000.00 3,795.00
5 Mandor 0.0330 50,000.00 1,650.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0400 M3 3,000,000.00 120,000.00
### Paku Panjang 7 - 12 cm 0.4000 Kg 21,000.00 8,400.00
### Teak Oil 0.2000 Liter 47,000.00 9,400.00
85 Balok Kayu Kls II 0.0150 M3 4,500,000.00 67,500.00
### Tripleks 120 x 240 x 9 mm 0.3500 Lembar 125,000.00 43,750.00
93 Dolken/Perancah Diameter 10 6.0000 Batang 40,000.00 240,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 576,995.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


43 Pasang Begisting Untuk Dinding

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.6600 70,000.00 46,200.00
9 Tukang Kayu 0.3300 110,000.00 36,300.00
10 Kepala Tukang Kayu 0.0330 115,000.00 3,795.00
5 Mandor 0.0330 50,000.00 1,650.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0300 M3 3,000,000.00 90,000.00
### Paku Panjang 7 - 12 cm 0.4000 Kg 21,000.00 8,400.00
### Teak Oil 0.2000 Liter 47,000.00 9,400.00
85 Balok Kayu Kls II 0.0200 M3 4,500,000.00 90,000.00
### Tripleks 120 x 240 x 9 mm 0.3500 Lembar 125,000.00 43,750.00
93 Dolken/Perancah Diameter 10 3.0000 Batang 40,000.00 120,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 449,495.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
44 Memasang Begisting Untuk Tangga

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.6600 70,000.00 46,200.00
9 Tukang Kayu 0.3300 110,000.00 36,300.00
10 Kepala Tukang Kayu 0.0330 115,000.00 3,795.00
5 Mandor 0.0330 50,000.00 1,650.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0300 M3 3,000,000.00 90,000.00
### Paku Panjang 7 - 12 cm 0.4000 Kg 21,000.00 8,400.00
### Teak Oil 0.1500 Liter 47,000.00 7,050.00
85 Balok Kayu Kls II 0.0150 M3 4,500,000.00 67,500.00
### Tripleks 120 x 240 x 9 mm 0.3500 Lembar 125,000.00 43,750.00
93 Dolken/Perancah Diameter 10 2.0000 Batang 40,000.00 80,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 384,645.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


45 Memasang Jembatan Untuk pengecoran Beton

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1500 70,000.00 10,500.00
9 Tukang Kayu 0.0500 110,000.00 5,500.00
10 Kepala Tukang Kayu 0.0050 115,000.00 575.00
5 Mandor 0.0080 50,000.00 400.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

89 Papan Kayu Kls III 0.0264 M3 3,000,000.00 79,200.00


### Paku Panjang 4 - 6 cm 0.6000 Kg 21,000.00 12,600.00
93 Dolken/Perancah Diameter 10 0.5000 Batang 40,000.00 20,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 128,775.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
46 Membuat Kolom Praktis Beton Bertulang (11 x 11) cm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1800 70,000.00 12,600.00
6 Tukang Batu 0.0200 110,000.00 2,200.00
9 Tukang Kayu 0.0200 110,000.00 2,200.00
11 Tukang Besi Beton 0.0200 110,000.00 2,200.00
7 Kepala Tukang Batu 0.0060 115,000.00 690.00
5 Mandor 0.0090 50,000.00 450.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0020 M3 3,000,000.00 6,000.00
### Paku Panjang 7 - 12 cm 0.0100 Kg 21,000.00 210.00
### Besi Beton Polos 3.0000 Kg 12,500.00 37,500.00
### Kawat Ikat Beton 0.4500 Kg 25,000.00 11,250.00
33 PC. Merk Tiga Roda (50 Kg) 0.0800 Zak 77,000.00 6,160.00
21 Pasir Beton 0.0060 M3 175,000.00 1,050.00
15 Kerikil Pecah 2 - 3 cm (MSC) 0.0090 M3 255,000.00 2,295.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 84,805.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


47 Membuat Ring Balok Beton Bertulang (10 x 15) cm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.2970 70,000.00 20,790.00
6 Tukang Batu 0.0330 110,000.00 3,630.00
9 Tukang Kayu 0.0330 110,000.00 3,630.00
11 Tukang Besi Beton 0.0330 110,000.00 3,630.00
7 Kepala Tukang Batu 0.0100 115,000.00 1,150.00
5 Mandor 0.0150 50,000.00 750.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
89 Papan Kayu Kls III 0.0030 M3 3,000,000.00 9,000.00
### Paku Panjang 4 - 6 cm 0.0200 Kg 21,000.00 420.00
### Besi Beton Polos 3.6000 Kg 12,500.00 45,000.00
### Kawat Ikat Beton 0.0500 Kg 25,000.00 1,250.00
33 PC. Merk Tiga Roda (50 Kg) 0.1100 Zak 77,000.00 8,470.00
21 Pasir Beton 0.0090 M3 175,000.00 1,575.00
15 Kerikil Pecah 2 - 3 cm (MSC) 0.0150 M3 255,000.00 3,825.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 103,120.00 Per
KODE

A. 4.1.1.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

153,120.00
SUB TOTAL
( Rp )

623,423.61
SUB TOTAL
( Rp )

-
776,543.61

KODE

A. 4.1.1.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

153,120.00
SUB TOTAL
( Rp )

666,135.00
SUB TOTAL
( Rp )

-
819,255.00


KODE

A. 4.1.1.4

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

111,300.00
SUB TOTAL
( Rp )

603,384.50
SUB TOTAL
( Rp )

-
714,684.50

KODE

A. 4.1.1.5

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

153,120.00
SUB TOTAL
( Rp )
739,398.00
SUB TOTAL
( Rp )

-
892,518.00


KODE

A. 4.1.1.7

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

153,120.00
SUB TOTAL
( Rp )

805,615.00
SUB TOTAL
( Rp )

-
958,735.00

KODE

A. 4.1.1.8

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

153,120.00
SUB TOTAL
( Rp )

823,851.00
SUB TOTAL
( Rp )

-
976,971.00


KODE

A 4.1.1.9

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

153,120.00
SUB TOTAL
( Rp )

854,946.50
SUB TOTAL
( Rp )

-
1,008,066.50

KODE

A. 4.1.1.17

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

1,360.50
SUB TOTAL
( Rp )

13,500.00
SUB TOTAL
( Rp )
-
14,860.50

Kg
KODE

A. 4.1.1.20

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

69,290.00
SUB TOTAL
( Rp )

131,000.00
SUB TOTAL
( Rp )

-
200,290.00

KODE

A. 4.1.1.21

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

69,290.00
SUB TOTAL
( Rp )

146,000.00
SUB TOTAL
( Rp )
-
215,290.00


KODE

A. 4.1.1.22

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

87,945.00
SUB TOTAL
( Rp )

329,050.00
SUB TOTAL
( Rp )

-
416,995.00

KODE

A. 4.1.1.23

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

87,945.00
SUB TOTAL
( Rp )
342,550.00
SUB TOTAL
( Rp )

-
430,495.00


KODE

A. 4.1.1.24

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

87,945.00
SUB TOTAL
( Rp )

489,050.00
SUB TOTAL
( Rp )

-
576,995.00

KODE

A. 4.1.1.25

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

87,945.00
SUB TOTAL
( Rp )

361,550.00
SUB TOTAL
( Rp )
-
449,495.00


KODE

A. 4.1.1.26

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

87,945.00
SUB TOTAL
( Rp )

296,700.00
SUB TOTAL
( Rp )

-
384,645.00

KODE

A. 4.1.1.27

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

16,975.00
SUB TOTAL
( Rp )

111,800.00
SUB TOTAL
( Rp )
-
128,775.00


KODE

A. 4.1.1.35

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

20,340.00
SUB TOTAL
( Rp )

64,465.00
SUB TOTAL
( Rp )

-
84,805.00

M'

KODE

A. 4.1.1.36

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

33,580.00
SUB TOTAL
( Rp )
69,540.00
SUB TOTAL
( Rp )

-
103,120.00

M'
776,543.61 M³

4.940

819,255.00 M³

5.520
714,684.50 M³

4.600
0.893
0.999

892,518.00 M³

6.52
958,735.00 M³

7.42

976,971.00 M³

7.680
1,008,066.50 M³

8.12

14,860.50 Kg
200,290.00 M²

215,290.00 M²
416,995.00 M²

430,495.00 M²
576,995.00 M²

449,495.00 M²
384,645.00 M²

128,775.00 M²
84,805.00 M'

0.08
0.08

103,120.00 M'

0.11
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
48 Memasang Baja Profil

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.6000 70,000.00


13 Tukang Las 0.6000 110,000.00
14 Kepala Tukang Las 0.0600 115,000.00
5 Mandor 0.0030 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

593 Besi Profil 1.150 Kg 18,400.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY 1.00 Kg HARGA SATUAN ( Rp ) 136,210.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


49 Memasang Rangka Kuda - Kuda Baja IWF

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)
4 Pekerja 0.6000 70,000.00
13 Tukang Las 0.6000 110,000.00
14 Kepala Tukang Las 0.0600 115,000.00
5 Mandor 0.0030 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
594 Besi Baja IWF 1.150 Kg 19,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 Kg HARGA SATUAN ( Rp ) 136,900.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
50 Mengerjakan 100 Kg Perakitan Baja

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)
4 Pekerja 0.1000 70,000.00
11 Tukang Besi Beton 0.1000 110,000.00
12 Kepala Tukang Besi Beton 0.0010 115,000.00
5 Mandor 0.0050 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
358 Solar Untuk Industri 1.000 Liter 16,800.00
350 Flux Oil 0.100 Liter 30,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY 1.00 Kg HARGA SATUAN ( Rp ) 38,165.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


51 Membuat Pintu Plat Baja Tebal 2 mm Rangkap, Rangka

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)
4 Pekerja 1.0500 70,000.00
13 Tukang Las 1.0500 110,000.00
14 Kepala Tukang Las 0.1050 115,000.00
5 Mandor 0.0520 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

167 Besi Siku L. 30 x 30 x 3 mm 15.000 Kg 87,500.00


596 Besi Plat Baja 32.80 Kg 45,000.00
597 Kawat Las Listrik 0.050 Kg 33,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) ###
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
52 Mengelas 10 cm Dengan Las Listrik

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)
4 Pekerja 0.0400 70,000.00
13 Tukang Las 0.0200 110,000.00
14 Kepala Tukang Las 0.0200 115,000.00
5 Mandor 0.0200 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

597 Kawat Las Listrik 0.4000 Kg 33,000.00


358 Solar Untuk Industri 0.3000 Liter 16,800.00
350 Flux Oil 0.0400 Liter 30,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY 10 Cm² HARGA SATUAN ( Rp ) 2,774.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


53 Memasang Pintu Rolling Door Besi

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 1.2000 70,000.00


13 Tukang Las 1.2000 110,000.00
14 Kepala Tukang Las 0.1200 115,000.00
5 Mandor 0.0060 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
602 Pintu Gulung Besi(Rolling Do 1.000 m2 570,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )

VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 800,100.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
54 Memasang Pintu Folding Door

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.4400 70,000.00


11 Tukang Besi Beton 0.4400 110,000.00
12 Kepala Tukang Besi Beton 0.0440 115,000.00
5 Mandor 0.0220 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
603 Pintu Lipat (Folding door) 1.000 m2 1,000,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) ###

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


55 Memasang Kusen Pintu Aluminium

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)
4 Pekerja 0.0430 70,000.00
11 Tukang Besi Beton 0.0430 110,000.00
12 Kepala Tukang Besi Beton 0.0043 115,000.00
5 Mandor 0.0021 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
606 Profil alumunium 1.100 M 60,000.00
607 Skrup Fixer 2.0000 Biji 250.00
608 Sealant 0.0600 Tube 35,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )
SUB JUMLAH ( Rp )

VOLUME
QUANTITY 1.00 M' HARGA SATUAN ( Rp ) 76,939.50
ANALISA BIAYA PEKERJAAN KODE
Memasang Baja Profil
A. 4.2.1.1

DISIAPKAN OLEH : TANGGAL


SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

42,000.00
66,000.00
6,900.00
150.00

SUB JUMLAH ( Rp ) 115,050.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

21,160.00

SUB JUMLAH ( Rp ) 21,160.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 136,210.00

Per Kg

ANALISA BIAYA PEKERJAAN KODE


Memasang Rangka Kuda - Kuda Baja IWF
A. 4.2.1.2
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )
42,000.00
66,000.00
6,900.00
150.00

SUB JUMLAH ( Rp ) 115,050.00


BIAYA SUB TOTAL
( Rp ) ( Rp )
21,850.00

SUB JUMLAH ( Rp ) 21,850.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 136,900.00

Per Kg
ANALISA BIAYA PEKERJAAN KODE
Mengerjakan 100 Kg Perakitan Baja
A. 4.2.1.3

DISIAPKAN OLEH : TANGGAL


SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )
7,000.00
11,000.00
115.00
250.00

SUB JUMLAH ( Rp ) 18,365.00


BIAYA SUB TOTAL
( Rp ) ( Rp )
16,800.00
3,000.00

SUB JUMLAH ( Rp ) 19,800.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 38,165.00

Per Kg

ANALISA BIAYA PEKERJAAN KODE


mbuat Pintu Plat Baja Tebal 2 mm Rangkap, Rangka Baja
A. 4.2.1.4
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )
73,500.00
115,500.00
12,075.00
2,600.00

SUB JUMLAH ( Rp ) 203,675.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

###
###
1,650.00

SUB JUMLAH ( Rp ) 2,790,150.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 2,993,825.00

Per M²
ANALISA BIAYA PEKERJAAN KODE
Mengelas 10 cm Dengan Las Listrik
A. 4.2.1.5

DISIAPKAN OLEH : TANGGAL


SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )
2,800.00
2,200.00
2,300.00
1,000.00

SUB JUMLAH ( Rp ) 8,300.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

13,200.00
5,040.00
1,200.00

SUB JUMLAH ( Rp ) 19,440.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 27,740.00

Per Cm²

ANALISA BIAYA PEKERJAAN KODE


Memasang Pintu Rolling Door Besi
A. 4.2.1.7
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

84,000.00
132,000.00
13,800.00
300.00

SUB JUMLAH ( Rp ) 230,100.00


BIAYA SUB TOTAL
( Rp ) ( Rp )
570,000.00

SUB JUMLAH ( Rp ) 570,000.00


BIAYA SUB TOTAL
( Rp ) ( Rp )
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 800,100.00

Per M²
ANALISA BIAYA PEKERJAAN KODE
Memasang Pintu Folding Door
A. 4.2.1.8

DISIAPKAN OLEH : TANGGAL


SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

30,800.00
48,400.00
5,060.00
1,100.00

SUB JUMLAH ( Rp ) 85,360.00


BIAYA SUB TOTAL
( Rp ) ( Rp )
###

SUB JUMLAH ( Rp ) 1,000,000.00


BIAYA SUB TOTAL
( Rp ) ( Rp )

SUB JUMLAH ( Rp ) -
TOTAL (Rp) 1,085,360.00

Per M²

ANALISA BIAYA PEKERJAAN KODE


Memasang Kusen Pintu Aluminium
A. 4.2.1.11

DISIAPKAN OLEH : TANGGAL


SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )
3,010.00
4,730.00
494.50
105.00

SUB JUMLAH ( Rp ) 8,339.50


BIAYA SUB TOTAL
( Rp ) ( Rp )
66,000.00
500.00
2,100.00

SUB JUMLAH ( Rp ) 68,600.00


BIAYA SUB TOTAL
( Rp ) ( Rp )
SUB JUMLAH ( Rp ) -
TOTAL (Rp) 76,939.50

Per M'
136,210.00 Kg

0.87

136,900.00 Kg

0.659
38,165.00 Kg

0.444

### M²

0.379
2,774.00 Cm²

0.2874

800,100.00 M²

0.1936
### M²

0.28

76,939.50 M'

0.22
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
56 Pasangan Bata Merah Tebal 1 Bata, 1Pc : 2Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.6000 70,000.00 42,000.00


6 Tukang Batu 0.2000 110,000.00 22,000.00
7 Kepala Tukang Batu 0.0200 115,000.00 2,300.00
5 Mandor 0.0300 50,000.00 1,500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

28 Batu Bata Kls I 140.000 Buah 800.00 ###


33 PC. Merk Tiga Roda (50 Kg) 0.8700 Zak 77,000.00 66,990.00
22 Pasir Pasang 0.0800 M3 145,000.00 11,600.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 258,390.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


57 Pasangan Bata Merah Tebal 1 Bata, 1Pc : 3Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.6000 70,000.00 42,000.00
6 Tukang Batu 0.2000 110,000.00 22,000.00
7 Kepala Tukang Batu 0.0200 115,000.00 2,300.00
5 Mandor 0.0300 50,000.00 1,500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
28 Batu Bata Kls I 140.000 Buah 800.00 ###
33 PC. Merk Tiga Roda (50 Kg) 0.6590 Zak 77,000.00 50,743.00
22 Pasir Pasang 0.0910 M3 145,000.00 13,195.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 243,738.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
58 Pasangan Bata Merah Tebal 1 Bata, 1Pc : 5Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.6000 70,000.00 42,000.00
6 Tukang Batu 0.2000 110,000.00 22,000.00
7 Kepala Tukang Batu 0.0200 115,000.00 2,300.00
5 Mandor 0.0300 50,000.00 1,500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
28 Batu Bata Kls I 140.000 Buah 800.00 ###
33 PC. Merk Tiga Roda (50 Kg) 0.4440 Zak 77,000.00 34,188.00
22 Pasir Pasang 0.1020 M3 145,000.00 14,790.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 228,778.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


59 Pasangan Bata Merah Tebal 1/2 Bata, 1Pc : 2Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.3000 70,000.00 21,000.00
6 Tukang Batu 0.1000 110,000.00 11,000.00
7 Kepala Tukang Batu 0.0100 115,000.00 1,150.00
5 Mandor 0.0150 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

28 Batu Bata Kls I 70.000 Buah 800.00 56,000.00


33 PC. Merk Tiga Roda (50 Kg) 0.3790 Zak 77,000.00 29,183.00
22 Pasir Pasang 0.0380 M3 145,000.00 5,510.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 124,593.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
60 Pasangan Bata Merah Tebal 1/2 Bata, 1Pc : 3Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.3000 70,000.00 21,000.00
6 Tukang Batu 0.1000 110,000.00 11,000.00
7 Kepala Tukang Batu 0.0100 115,000.00 1,150.00
5 Mandor 0.0150 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

28 Batu Bata Kls I 70.000 Buah 800.00 56,000.00


33 PC. Merk Tiga Roda (50 Kg) 0.2870 Zak 77,000.00 22,099.00
22 Pasir Pasang 0.0400 M3 145,000.00 5,800.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 117,799.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


61 Pasangan Bata Merah Tebal 1/2 Bata, 1Pc : 5Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.3000 70,000.00 21,000.00


6 Tukang Batu 0.1000 110,000.00 11,000.00
7 Kepala Tukang Batu 0.0100 115,000.00 1,150.00
5 Mandor 0.0150 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
28 Batu Bata Kls I 70.000 Buah 800.00 56,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.1940 Zak 77,000.00 14,938.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 111,363.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
62 Pasangan Dinding Roster / Terawang, 1Pc : 3Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.3000 70,000.00 21,000.00


6 Tukang Batu 0.1000 110,000.00 11,000.00
7 Kepala Tukang Batu 0.0100 115,000.00 1,150.00
5 Mandor 0.0150 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
111 Roster Besar 30.000 Buah 12,000.00 ###
33 PC. Merk Tiga Roda (50 Kg) 0.2800 Zak 77,000.00 21,560.00
22 Pasir Pasang 0.0320 M3 145,000.00 4,640.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 420,100.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


63 Pasangan Dinding Roster / Terawang, 1Pc : 4Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.3000 70,000.00 21,000.00
7 Kepala Tukang Batu 0.1000 115,000.00 11,500.00
6 Tukang Batu 0.0100 110,000.00 1,100.00
5 Mandor 0.0150 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
111 Roster Besar 30.000 Buah 12,000.00 ###
33 PC. Merk Tiga Roda (50 Kg) 0.2200 Zak 77,000.00 16,940.00
22 Pasir Pasang 0.0350 M3 145,000.00 5,075.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY 1.00 M² HARGA SATUAN ( Rp ) 416,365.00 Per
KODE

A. 4.4.1.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

67,800.00
SUB TOTAL
( Rp )

190,590.00
SUB TOTAL
( Rp )

-
258,390.00

KODE

A. 4.4.1.2
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

67,800.00
SUB TOTAL
( Rp )

175,938.00
SUB TOTAL
( Rp )

-
243,738.00


KODE

A. 4.4.1.4

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

67,800.00
SUB TOTAL
( Rp )

160,978.00
SUB TOTAL
( Rp )

-
228,778.00

KODE

A. 4.4.1.7
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

33,900.00
SUB TOTAL
( Rp )

90,693.00
SUB TOTAL
( Rp )

-
124,593.00


KODE

A. 4.4.1.8

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

33,900.00
SUB TOTAL
( Rp )

83,899.00
SUB TOTAL
( Rp )

-
117,799.00

KODE

A. 4.4.1.10
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

33,900.00
SUB TOTAL
( Rp )

77,463.00
SUB TOTAL
( Rp )
-
111,363.00


KODE

A. 4.4.1.22

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

33,900.00
SUB TOTAL
( Rp )

386,200.00
SUB TOTAL
( Rp )

-
420,100.00

KODE

A. 4.4.1.23

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

34,350.00
SUB TOTAL
( Rp )

382,015.00
SUB TOTAL
( Rp )
-
416,365.00


258,390.00 M²

0.87

243,738.00 M²

0.659
228,778.00 M²

0.444

124,593.00 M²

0.379
117,799.00 M²

0.2874

111,363.00 M²

0.1936
420,100.00 M²

0.28

416,365.00 M²

0.22
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
64 Plesteran Dinding Tebal 15 mm 1Pc : 2Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.3000 70,000.00 21,000.00
6 Tukang Batu 0.1500 110,000.00 16,500.00
7 Kepala Tukang Batu 0.0150 115,000.00 1,725.00
5 Mandor 0.0150 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 0.204 Zak 77,000.00 15,744.96
22 Pasir Pasang 0.020 M3 145,000.00 2,900.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 58,619.96 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


65 Plesteran Dinding Tebal 15 mm 1Pc : 3Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.3000 70,000.00 21,000.00
6 Tukang Batu 0.1500 110,000.00 16,500.00
7 Kepala Tukang Batu 0.0150 115,000.00 1,725.00
5 Mandor 0.0150 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 0.1555 Zak 77,000.00 11,975.04
22 Pasir Pasang 0.0230 M3 145,000.00 3,335.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 55,285.04 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
66 Plesteran Dinding Tebal 15 mm 1Pc : 5Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.3000 70,000.00 21,000.00


6 Tukang Batu 0.1500 110,000.00 16,500.00
7 Kepala Tukang Batu 0.0150 115,000.00 1,725.00
5 Mandor 0.0150 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.104 Zak 77,000.00 8,008.00
22 Pasir Pasang 0.026 M3 145,000.00 3,770.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 51,753.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


67 Plesteran Dinding Tebal 20 mm 1Pc : 2Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.4000 70,000.00 28,000.00


6 Tukang Batu 0.2000 110,000.00 22,000.00
7 Kepala Tukang Batu 0.0200 115,000.00 2,300.00
5 Mandor 0.0220 50,000.00 1,100.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 0.273 Zak 77,000.00 20,993.28
22 Pasir Pasang 0.027 M3 145,000.00 3,915.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 78,308.28 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
68 Plesteran Dinding Tebal 20 mm 1Pc : 3Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.2600 70,000.00 18,200.00


6 Tukang Batu 0.2000 110,000.00 22,000.00
7 Kepala Tukang Batu 0.0200 115,000.00 2,300.00
5 Mandor 0.0130 50,000.00 650.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 0.2070 Zak 77,000.00 15,939.00
22 Pasir Pasang 0.0310 M3 145,000.00 4,495.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 63,584.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


69 Plesteran Dinding Tebal 20 mm 1Pc : 5Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.4000 70,000.00 28,000.00


6 Tukang Batu 0.2000 110,000.00 22,000.00
7 Kepala Tukang Batu 0.0200 115,000.00 2,300.00
5 Mandor 0.0220 50,000.00 1,100.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 0.1380 Zak 77,000.00 10,626.00
22 Pasir Pasang 0.0350 M3 145,000.00 5,075.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 69,101.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
70 Plesteran Skoning 1Pc : 2Ps Lebar 10 cm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.4000 70,000.00 28,000.00


6 Tukang Batu 0.2000 110,000.00 22,000.00
7 Kepala Tukang Batu 0.0200 115,000.00 2,300.00
5 Mandor 0.0220 50,000.00 1,100.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 0.1380 Zak 77,000.00 10,626.00
22 Pasir Pasang 0.0350 M3 145,000.00 5,075.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 69,101.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


71 Plesteran Teraso 1Pc : 2Ps Tebal 10 cm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.4000 70,000.00 28,000.00


6 Tukang Batu 0.2000 110,000.00 22,000.00
7 Kepala Tukang Batu 0.0200 115,000.00 2,300.00
5 Mandor 0.0220 50,000.00 1,100.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 0.1380 Zak 77,000.00 10,626.00
22 Pasir Pasang 0.0350 M3 145,000.00 5,075.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 69,101.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
72 Plesteran Ciprat, 1Pc : 2Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.3000 70,000.00 21,000.00


6 Tukang Batu 0.1000 110,000.00 11,000.00
7 Kepala Tukang Batu 0.0100 115,000.00 1,150.00
5 Mandor 0.0150 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 0.0864 Zak 77,000.00 6,652.80
22 Pasir Pasang 0.0060 M3 145,000.00 870.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 41,422.80 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


73 Finishing Siar Adukan 1Pc : 2Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.3000 70,000.00 21,000.00
6 Tukang Batu 0.1500 110,000.00 16,500.00
7 Kepala Tukang Batu 0.0150 115,000.00 1,725.00
5 Mandor 0.0150 50,000.00 750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
33 PC. Merk Tiga Roda (50 Kg) 0.1268 Zak 77,000.00 9,763.60
22 Pasir Pasang 0.0120 M3 145,000.00 1,740.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 51,478.60 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
74 Memasang Acian

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.2000 70,000.00 14,000.00


6 Tukang Batu 0.1000 110,000.00 11,000.00
7 Kepala Tukang Batu 0.0100 115,000.00 1,150.00
5 Mandor 0.0100 50,000.00 500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

33 PC. Merk Tiga Roda (50 Kg) 0.0650 Zak 77,000.00 5,005.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 31,655.00 Per
KODE

A. 4.4.2.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

39,975.00
SUB TOTAL
( Rp )

18,644.96
SUB TOTAL
( Rp )

-
58,619.96

KODE

A. 4.4.2.3

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

39,975.00
SUB TOTAL
( Rp )

15,310.04
SUB TOTAL
( Rp )

-
55,285.04


KODE

A. 4.4.2.5

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

39,975.00
SUB TOTAL
( Rp )

11,778.00
SUB TOTAL
( Rp )

-
51,753.00

KODE

A. 4.4.2.13
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

53,400.00
SUB TOTAL
( Rp )

24,908.28
SUB TOTAL
( Rp )

-
78,308.28


KODE

A. 4.4.2.14
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

43,150.00
SUB TOTAL
( Rp )

20,434.00
SUB TOTAL
( Rp )

-
63,584.00

KODE

A. 4.4.2.16
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

53,400.00
SUB TOTAL
( Rp )

15,701.00
SUB TOTAL
( Rp )
-
69,101.00


KODE
A. 4.4.2.20
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

53,400.00
SUB TOTAL
( Rp )

15,701.00
SUB TOTAL
( Rp )

-
69,101.00

KODE
A. 4.4.2.22
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

53,400.00
SUB TOTAL
( Rp )

15,701.00
SUB TOTAL
( Rp )
-
69,101.00


KODE

A. 4.4.2.23
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

33,900.00
SUB TOTAL
( Rp )

7,522.80
SUB TOTAL
( Rp )

-
41,422.80

KODE

A. 4.4.2.26
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

39,975.00
SUB TOTAL
( Rp )

11,503.60
SUB TOTAL
( Rp )

-
51,478.60


KODE

A. 4.4.2.27
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

26,650.00
SUB TOTAL
( Rp )

5,005.00
SUB TOTAL
( Rp )

-
31,655.00


58,619.96 M²

0.20448

55,285.04 M²

0.15552
51,753.00 M²

0.10368

78,308.28 M²

0.27264
63,584.00 M²

0.20736

69,101.00 M²

0.13824
69,101.00 M²

0.13824

69,101.00 M²

0.13824
41,422.80 M²

0.0864

51,478.60 M²

161

0.1268
31,655.00 M²

0.0650
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
75 Memasang Lantai Ubin PC Abu - Abu ( 20 x 20 ) cm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.2700 70,000.00 18,900.00
6 Tukang Batu 0.1350 110,000.00 14,850.00
7 Kepala Tukang Batu 0.0140 115,000.00 1,610.00
5 Mandor 0.0140 50,000.00 700.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Tegel Abu-abu 20 x 20 cm 1.0000 M2 45,000.00 45,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.2080 Zak 77,000.00 16,016.00
30 Semen Warna 1.6200 Kg 14,500.00 23,490.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 127,091.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


76 Memasang Lantai Ubin Warna ( 20 x 20 ) cm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.2700 70,000.00 18,900.00
6 Tukang Batu 0.1350 110,000.00 14,850.00
7 Kepala Tukang Batu 0.0140 115,000.00 1,610.00
5 Mandor 0.0140 50,000.00 700.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Tegel Warna 20 x 20 cm 1.0000 M2 48,500.00 48,500.00
33 PC. Merk Tiga Roda (50 Kg) 0.2080 Zak 77,000.00 16,016.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00
30 Semen Warna 1.6200 Kg 14,500.00 23,490.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 130,591.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
77 Memasang Lantai Ubin Teraso ( 30 x 30 ) cm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.2600 70,000.00 18,200.00


6 Tukang Batu 0.1300 110,000.00 14,300.00
7 Kepala Tukang Batu 0.0130 115,000.00 1,495.00
5 Mandor 0.0130 50,000.00 650.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Tegel Traso Klas I 30 x 30 cm 1.0000 M2 52,200.00 52,200.00
33 PC. Merk Tiga Roda (50 Kg) 0.2000 Zak 77,000.00 15,400.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00
30 Semen Warna 1.5000 Kg 14,500.00 21,750.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 130,520.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


78 Memasang Lantai Keramik ( 30 x 30 ) cm Kwalitas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.7000 70,000.00 49,000.00
6 Tukang Batu 0.3500 110,000.00 38,500.00
7 Kepala Tukang Batu 0.0350 115,000.00 4,025.00
5 Mandor 0.0350 50,000.00 1,750.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Tegel Keramik Kualitas I 1.0000 M2 95,000.00 95,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.2000 Zak 77,000.00 15,400.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00
30 Semen Warna 1.5000 Kg 14,500.00 21,750.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 231,950.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
79 Memasang Lantai Keramik ( 30 x 30 ) cm Kwalitas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.7000 70,000.00 49,000.00
6 Tukang Batu 0.3500 110,000.00 38,500.00
7 Kepala Tukang Batu 0.0350 115,000.00 4,025.00
5 Mandor 0.0350 50,000.00 1,750.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )

### Tegel Keramik Kualitas II 1.0000 M2 66,500.00 66,500.00


33 PC. Merk Tiga Roda (50 Kg) 0.2000 Zak 77,000.00 15,400.00
22 Pasir Pasang 0.0450 M3 145,000.00 6,525.00
30 Semen Warna 1.5000 Kg 14,500.00 21,750.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 203,450.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


80 Memasang Dinding Porselin ( 10 x 20 ) cm Kwalitas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.9000 70,000.00 63,000.00
6 Tukang Batu 0.4500 110,000.00 49,500.00
7 Kepala Tukang Batu 0.0450 115,000.00 5,175.00
5 Mandor 0.0450 50,000.00 2,250.00
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )

### Porselin Kualitas I (motif) 1.0000 M2 75,000.00 75,000.00


33 PC. Merk Tiga Roda (50 Kg) 0.1860 Zak 77,000.00 14,322.00
22 Pasir Pasang 0.0180 M3 145,000.00 2,610.00
30 Semen Warna 2.7500 Kg 14,500.00 39,875.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 251,732.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
81 Memasang Dinding Porselin ( 10 x 20 ) cm Kwalitas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.9000 70,000.00 63,000.00
6 Tukang Batu 0.4500 110,000.00 49,500.00
7 Kepala Tukang Batu 0.0450 115,000.00 5,175.00
5 Mandor 0.0450 50,000.00 2,250.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Porselin Kualitas II (motif) 1.0000 M2 62,000.00 62,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.1860 Zak 77,000.00 14,322.00
22 Pasir Pasang 0.0180 M3 145,000.00 2,610.00
30 Semen Warna 2.7500 Kg 14,500.00 39,875.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 238,732.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


82 Memasang Dinding Porselin ( 20 x 20 ) cm Kwalitas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.9000 70,000.00 63,000.00
6 Tukang Batu 0.4500 110,000.00 49,500.00
7 Kepala Tukang Batu 0.0450 115,000.00 5,175.00
5 Mandor 0.0450 50,000.00 2,250.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Porselin Kualitas I (motif) 1.0000 M2 75,000.00 75,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.1860 Zak 77,000.00 14,322.00
22 Pasir Pasang 0.0180 M3 145,000.00 2,610.00
30 Semen Warna 1.9400 Kg 14,500.00 28,130.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 239,987.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
83 Memasang Dinding Porselin ( 20 x 20 ) cm Kwalitas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.9000 70,000.00 63,000.00
6 Tukang Batu 0.4500 110,000.00 49,500.00
7 Kepala Tukang Batu 0.0450 115,000.00 5,175.00
5 Mandor 0.0450 50,000.00 2,250.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Porselin Kualitas II (motif) 1.0000 M2 62,000.00 62,000.00
33 PC. Merk Tiga Roda (50 Kg) 0.1860 Zak 77,000.00 14,322.00
22 Pasir Pasang 0.0180 M3 145,000.00 2,610.00
30 Semen Warna 1.9400 Kg 14,500.00 28,130.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 226,987.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


84 Memasang Dinding Keramik ( 20 x 20 ) cm Kwalitas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.9000 70,000.00 63,000.00
6 Tukang Batu 0.4500 110,000.00 49,500.00
7 Kepala Tukang Batu 0.0450 115,000.00 5,175.00
5 Mandor 0.0450 50,000.00 2,250.00
SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )

### Keramik Dinding Kwalitas I 1.0000 M2 72,000.00 72,000.00


33 PC. Merk Tiga Roda (50 Kg) 0.1860 Zak 77,000.00 14,322.00
22 Pasir Pasang 0.0180 M3 145,000.00 2,610.00
30 Semen Warna 1.9400 Kg 14,500.00 28,130.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 236,987.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
85 Memasang Dinding Marmer ( 100 x 100 ) cm Kwalitas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 1.3000 70,000.00 91,000.00
8 Kepala Profil Batu / Kayu 0.6500 125,000.00 81,250.00
9 Tukang Kayu 0.0650 110,000.00 7,150.00
5 Mandor 0.0650 50,000.00 3,250.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
### Marmer Kualitas I 1.0600 M2 500,000.00 530,000.00
### Paku Panjang 7 - 12 cm 3.0030 Kg 21,000.00 63,063.00
33 PC. Merk Tiga Roda (50 Kg) 0.2490 Zak 77,000.00 19,173.00
22 Pasir Pasang 0.0250 M3 145,000.00 3,625.00
30 Semen Warna 0.6500 Kg 14,500.00 9,425.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 807,936.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


86 Memasang Dinding Batu Tempel

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.7000 70,000.00 49,000.00


8 Kepala Profil Batu / Kayu 0.3500 125,000.00 43,750.00
9 Tukang Kayu 0.0350 110,000.00 3,850.00
5 Mandor 0.0350 50,000.00 1,750.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
3 Batu Kali Keping/Tempel 1.1000 M3 175,000.00 192,500.00
33 PC. Merk Tiga Roda (50 Kg) 0.2350 Zak 77,000.00 18,095.00
22 Pasir Pasang 0.0350 M3 145,000.00 5,075.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 314,020.00 Per
KODE

A. 4.4.3.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

36,060.00
SUB TOTAL
( Rp )

91,031.00
SUB TOTAL
( Rp )

-
127,091.00

KODE

A. 4.4.3.6

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

36,060.00
SUB TOTAL
( Rp )

94,531.00
SUB TOTAL
( Rp )
-
130,591.00


KODE

A. 4.4.3.8

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

34,645.00
SUB TOTAL
( Rp )

95,875.00
SUB TOTAL
( Rp )

-
130,520.00

KODE

A. 4.4.3.35.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

93,275.00
SUB TOTAL
( Rp )

138,675.00
SUB TOTAL
( Rp )

-
231,950.00


KODE

A. 4.4.3.35.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

93,275.00
SUB TOTAL
( Rp )

110,175.00
SUB TOTAL
( Rp )

-
203,450.00

KODE

A. 4.4.3.49.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

119,925.00
SUB TOTAL
( Rp )

131,807.00
SUB TOTAL
( Rp )
-
251,732.00


KODE

A. 4.4.3.49.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

119,925.00
SUB TOTAL
( Rp )

118,807.00
SUB TOTAL
( Rp )

-
238,732.00

KODE

A. 4.4.3.50.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

119,925.00
SUB TOTAL
( Rp )

120,062.00
SUB TOTAL
( Rp )

-
239,987.00

KODE

A. 4.4.3.50.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

119,925.00
SUB TOTAL
( Rp )

107,062.00
SUB TOTAL
( Rp )

-
226,987.00

KODE

A. 4.4.3.54.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

119,925.00
SUB TOTAL
( Rp )

117,062.00
SUB TOTAL
( Rp )

-
236,987.00


KODE

A. 4.4.3.55

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

182,650.00
SUB TOTAL
( Rp )

625,286.00
SUB TOTAL
( Rp )

-
807,936.00

KODE
SNI-DT 91-0012-
2007. 58
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

98,350.00
SUB TOTAL
( Rp )

215,670.00
SUB TOTAL
( Rp )

-
314,020.00


127,091.00 M²

0.208

130,591.00 M²
130,520.00 M²

0.2

231,950.00 M²
203,450.00 M²

251,732.00 M²

0.1860
238,732.00 M²

239,987.00 M²
226,987.00 M²

236,987.00 M²
807,936.00 M²

0.2488

314,020.00 M²

0.235
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
87 Memasang Langit - Langit Tripleks ( 120 x 240 ) cm,
Tebal 3 mm
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :
NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1000 70,000.00 7,000.00
9 Tukang Kayu 0.1000 110,000.00 11,000.00
10 Kepala Tukang Kayu 0.0100 115,000.00 1,150.00
5 Mandor 0.0050 50,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Tripleks 120 x 240 x 3 mm 0.3750 Lembar 52,000.00 19,500.00


### Paku Panjang 1 - 3 cm 0.0300 Kg 21,000.00 630.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 39,530.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


88 Memasang Langit - Langit Lambriziring Kayu, Tebal 9 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.8000 70,000.00 56,000.00


9 Tukang Kayu 0.8000 110,000.00 88,000.00
10 Kepala Tukang Kayu 0.0800 115,000.00 9,200.00
5 Mandor 0.0400 50,000.00 2,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

79 Papan Kayu Kls I 0.0150 M3 ### 105,000.00


### Paku Panjang 1 - 3 cm 0.0100 Kg 21,000.00 210.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 260,410.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


89 Memasang Langit - Langit Gypsum Board Tebal 9 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.8000 70,000.00 56,000.00


9 Tukang Kayu 0.8000 110,000.00 88,000.00
10 Kepala Tukang Kayu 0.0800 115,000.00 9,200.00
5 Mandor 0.0400 50,000.00 2,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

79 Papan Kayu Kls I 0.0150 M3 ### 105,000.00


### Paku Panjang 1 - 3 cm 0.0100 Kg 21,000.00 210.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 260,410.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


90 Memasang List Langit - Langit Gypsum

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.8000 70,000.00 56,000.00


9 Tukang Kayu 0.8000 110,000.00 88,000.00
10 Kepala Tukang Kayu 0.0800 115,000.00 9,200.00
5 Mandor 0.0400 50,000.00 2,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
79 Papan Kayu Kls I 0.0150 M3 ### 105,000.00
### Paku Panjang 1 - 3 cm 0.0100 Kg 21,000.00 210.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 260,410.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
91 Memasang List Langit - Langit Kayu Profil

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.0500 70,000.00 3,500.00


9 Tukang Kayu 0.0500 110,000.00 5,500.00
10 Kepala Tukang Kayu 0.0050 115,000.00 575.00
5 Mandor 0.0030 50,000.00 150.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

96 List Profil Kayu 1.0500 M' 15,000.00 15,750.00


### Paku Panjang 1 - 3 cm 0.0100 Kg 21,000.00 210.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 25,685.00 Per
KODE

A. 4.5.2.5
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,400.00
SUB TOTAL
( Rp )

20,130.00
SUB TOTAL
( Rp )

-
39,530.00

KODE

A. 4.5.2.6
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

155,200.00
SUB TOTAL
( Rp )

105,210.00
SUB TOTAL
( Rp )
-
260,410.00

KODE
A. 4.5.2.7
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

155,200.00
SUB TOTAL
( Rp )

105,210.00
SUB TOTAL
( Rp )

-
260,410.00

KODE
A. 4.5.2.8
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

155,200.00
SUB TOTAL
( Rp )
105,210.00
SUB TOTAL
( Rp )

-
260,410.00


KODE

A. 4.5.2.10
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

9,725.00
SUB TOTAL
( Rp )

15,960.00
SUB TOTAL
( Rp )

-
25,685.00

M'
39,530.00 M²

260,410.00 M²
260,410.00 M²

260,410.00 M²
25,685.00 M'
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
92 Memasang Atap Genteng Kodok / Silang

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.150 70,000.00 10,500.00


9 Tukang Kayu 0.075 110,000.00 8,250.00
10 Kepala Tukang Kayu 0.008 115,000.00 920.00
5 Mandor 0.008 50,000.00 400.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

54 Genteng Silang/Kodok ### Buah 1,700.00 42,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 62,570.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


93 Memasang Bubungan Genteng Kodok / Silang

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.400 70,000.00 28,000.00


9 Tukang Kayu 0.200 110,000.00 22,000.00
10 Kepala Tukang Kayu 0.020 115,000.00 2,300.00
5 Mandor 0.002 50,000.00 100.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

55 Genteng Bubungan Silang 5.0000 Buah 5,500.00 27,500.00


33 PC. Merk Tiga Roda (50 Kg) 0.0032 Zak 77,000.00 246.40
22 Pasir Pasang 0.0320 M3 145,000.00 4,640.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 84,786.40 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
94 Memasang Atap Asbes Gelombang Besar

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1400 70,000.00 9,800.00
9 Tukang Kayu 0.0750 110,000.00 8,250.00
10 Kepala Tukang Kayu 0.0080 115,000.00 920.00
5 Mandor 0.0080 50,000.00 400.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
67 Asbes Gelombang Besar 0.5000 Lembar 50,000.00 25,000.00
### Paku Sumbat 0.1200 Buah 1,700.00 204.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 44,574.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


95 Memasang Atap Asbes Gelombang Kecil

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.140 70,000.00 9,800.00


9 Tukang Kayu 0.700 110,000.00 77,000.00
10 Kepala Tukang Kayu 0.007 115,000.00 805.00
5 Mandor 0.007 50,000.00 350.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

66 Asbes Gelombang Kecil 0.7500 Lembar 40,000.00 30,000.00


### Paku Sumbat 0.1200 Buah 1,700.00 204.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 118,159.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
96 Memasang Atap Asbes Gelombang 1,05 x 2,10 x 4 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.140 70,000.00 9,800.00
9 Tukang Kayu 0.070 110,000.00 7,700.00
10 Kepala Tukang Kayu 0.007 115,000.00 805.00
5 Mandor 0.007 50,000.00 350.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Asbes Gelombang Uk 92 x 250 cm 0.8000 lbr 65,000.00 52,000.00


### Paku Seng 0.1200 Kg 26,000.00 3,120.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 73,775.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


97 Pasang Bubungan Asbes Gelombang Kecil

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.084 70,000.00 5,880.00


9 Tukang Kayu 0.125 110,000.00 13,750.00
10 Kepala Tukang Kayu 0.013 115,000.00 1,495.00
5 Mandor 0.004 50,000.00 200.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

68 Asbes Bubungan Gelomb. Keci 2.4000 Lembar 40,150.00 96,360.00


### Paku Sumbat 6.0000 Buah 1,700.00 10,200.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 127,885.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
98 Memasang Atap Genteng Beton

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.084 70,000.00 5,880.00


9 Tukang Kayu 0.125 110,000.00 13,750.00
10 Kepala Tukang Kayu 0.013 115,000.00 1,495.00
5 Mandor 0.004 50,000.00 200.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

52 Genteng Beton/Press 11.000 Buah 13,500.00 148,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 169,825.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


99 Memasang Atap Genteng Metal

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.200 70,000.00 14,000.00


9 Tukang Kayu 0.100 110,000.00 11,000.00
10 Kepala Tukang Kayu 0.010 115,000.00 1,150.00
5 Mandor 0.010 50,000.00 500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
48 Genteng Metal Roof 1.5625 Lembar 45,000.00 70,312.50
### Paku Panjang 4 - 6 cm 0.0300 Kg 21,000.00 630.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 97,592.50 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
100 Memasang Bubungan Genteng Beton

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.200 70,000.00 14,000.00


9 Tukang Kayu 0.100 110,000.00 11,000.00
10 Kepala Tukang Kayu 0.010 115,000.00 1,150.00
5 Mandor 0.010 50,000.00 500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

49 Bubungan Genteng Metal Roo 5.0000 Buah 35,000.00 175,000.00


### Paku Panjang 4 - 6 cm 0.0032 Kg 21,000.00 67.20
### Paku Panjang 4 - 6 cm 0.0320 Kg 21,000.00 672.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 202,389.20 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


101 Memasang Bubungan Genteng Metal

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.400 70,000.00 28,000.00


9 Tukang Kayu 0.200 110,000.00 22,000.00
10 Kepala Tukang Kayu 0.020 115,000.00 2,300.00
5 Mandor 0.020 50,000.00 1,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
46 Sirap 1.100 Buah 4,000.00 4,400.00
### Paku Panjang 4 - 6 cm 0.050 Kg 21,000.00 1,050.00
33 PC. Merk Tiga Roda (50 Kg) 0.004 Zak 77,000.00 332.64
22 Pasir Pasang 0.032 M3 145,000.00 4,640.00
30 Semen Warna 1.000 Kg 14,500.00 14,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 78,222.64 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
102 Memasang Atap Seng Gelombang Besar

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.120 70,000.00 8,400.00


9 Tukang Kayu 0.060 110,000.00 6,600.00
10 Kepala Tukang Kayu 0.006 115,000.00 690.00
5 Mandor 0.006 50,000.00 300.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

70 Seng Gelombang Besar BJLS 0.700 Lembar 57,000.00 39,900.00


### Paku Seng 0.020 Kg 26,000.00 520.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 56,410.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


103 Memasang Bubungan Seng Gelombang Besar

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.120 70,000.00 8,400.00


9 Tukang Kayu 0.060 110,000.00 6,600.00
10 Kepala Tukang Kayu 0.006 115,000.00 690.00
5 Mandor 0.006 50,000.00 300.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

70 Seng Gelombang Besar BJLS 0.700 Lembar 57,000.00 39,900.00


### Paku Seng 0.020 Kg 26,000.00 520.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 56,410.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
104 Memasang Atap Genteng Pejaten

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.150 70,000.00 10,500.00


9 Tukang Kayu 0.075 110,000.00 8,250.00
10 Kepala Tukang Kayu 0.008 115,000.00 920.00
5 Mandor 0.008 50,000.00 400.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

56 Genteng Pejaten 25.000 Buah 1,750.00 43,750.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 63,820.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
105 Memasang Bubungan Pejaten

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.400 70,000.00 28,000.00


9 Tukang Kayu 0.200 110,000.00 22,000.00
10 Kepala Tukang Kayu 0.020 115,000.00 2,300.00
5 Mandor 0.002 50,000.00 100.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

57 Genteng Bubungan Pejaten 5.000 Bh 7,000.00 35,000.00


33 PC. Merk Tiga Roda (50 Kg) 0.160 Zak 77,000.00 12,320.00
22 Pasir Pasang 0.032 M3 145,000.00 4,640.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 104,360.00 Per
KODE

A. 4.5.2.2
TANGGAL
#REF!

SUB TOTAL
( Rp )

20,070.00
SUB TOTAL
( Rp )

42,500.00
SUB TOTAL
( Rp )

-
62,570.00

KODE

A. 4.5.2.5
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

52,400.00
SUB TOTAL
( Rp )

32,386.40
SUB TOTAL
( Rp )
-
84,786.40

M'
KODE
SNI-DT 91-0015-
2007. 8
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,370.00
SUB TOTAL
( Rp )

25,204.00
SUB TOTAL
( Rp )

-
44,574.00

KODE
SNI-DT 91-0015-
2007. 11
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

87,955.00
SUB TOTAL
( Rp )

30,204.00
SUB TOTAL
( Rp )
-
118,159.00


KODE

A. 4.5.2.15
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

18,655.00
SUB TOTAL
( Rp )

55,120.00
SUB TOTAL
( Rp )

-
73,775.00

KODE
SNI-DT 91-0015-
2007. 22b
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

21,325.00
SUB TOTAL
( Rp )

106,560.00
SUB TOTAL
( Rp )
-
127,885.00

M'
KODE

A. 4.5.2.30
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

21,325.00
SUB TOTAL
( Rp )

148,500.00
SUB TOTAL
( Rp )

-
169,825.00

M'

KODE

A. 4.5.2.32
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

26,650.00
SUB TOTAL
( Rp )

70,942.50
SUB TOTAL
( Rp )
-
97,592.50


KODE

A. 4.5.2.34
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

26,650.00
SUB TOTAL
( Rp )

175,739.20
SUB TOTAL
( Rp )

-
202,389.20

KODE

A. 4.5.2.36

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

53,300.00
SUB TOTAL
( Rp )

24,922.64
SUB TOTAL
( Rp )

-
78,222.64

M'
KODE

A. 4.5.2.38

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

15,990.00
SUB TOTAL
( Rp )

40,420.00
SUB TOTAL
( Rp )

-
56,410.00

KODE

A. 4.5.2.39

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

15,990.00
SUB TOTAL
( Rp )

40,420.00
SUB TOTAL
( Rp )

-
56,410.00


KODE
SNI-DT 91-0015-
2007. 39
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

20,070.00
SUB TOTAL
( Rp )

43,750.00
SUB TOTAL
( Rp )

-
63,820.00


KODE
SNI-DT 91-0015-
2007. 40
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

52,400.00
SUB TOTAL
( Rp )

51,960.00
SUB TOTAL
( Rp )

-
104,360.00

M'
62,570.00 M²

84,786.40 M'
44,574.00 M²

118,159.00 M²
73,775.00 M²

127,885.00 M'
169,825.00 M'

97,592.50 M²

1.5625
0.0300
202,389.20 M²

78,222.64 M'
`

56,410.00 M²

56,410.00 M²
63,820.00 M²
104,360.00 M'
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
106 Memasang Kusen Pintu dan Jendela Kayu Klas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 7.000 70,000.00 490,000.00
9 Tukang Kayu 21.000 110,000.00 ###
10 Kepala Tukang Kayu 2.100 115,000.00 241,500.00
5 Mandor 0.350 50,000.00 17,500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

81 Balok Kayu Kls I 1.1000 M3 6,500,000.00 ###


273 Paku Panjang 7 - 12 cm 1.2500 Kg 21,000.00 26,250.00
208 Lem Kayu 1.0000 Kg 30,000.00 30,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


107 Memasang Kusen Pintu dan Jendela Kayu Klas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 6.000 70,000.00 420,000.00
9 Tukang Kayu 18.000 110,000.00 ###
10 Kepala Tukang Kayu 1.800 115,000.00 207,000.00
5 Mandor 0.300 50,000.00 15,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 1.2000 M3 4,500,000.00 ###
273 Paku Panjang 7 - 12 cm 1.2500 Kg 21,000.00 26,250.00
208 Lem Kayu 1.0000 Kg 30,000.00 30,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
108 Memasang Daun Pintu Panel Kayu Klas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 1.0000 70,000.00 70,000.00
9 Tukang Kayu 3.0000 110,000.00 330,000.00
10 Kepala Tukang Kayu 0.3000 115,000.00 34,500.00
5 Mandor 0.0500 50,000.00 2,500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
79 Papan Kayu Kls I 0.0400 M3 7,000,000.00 280,000.00
208 Lem Kayu 0.5000 Kg 30,000.00 15,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 732,000.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


109 Memasang Daun Pintu Panel , Kayu Klas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 1.000 70,000.00 70,000.00


9 Tukang Kayu 3.000 110,000.00 330,000.00
10 Kepala Tukang Kayu 0.300 115,000.00 34,500.00
5 Mandor 0.050 50,000.00 2,500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

84 Papan Kayu Kls II 0.0400 M3 5,000,000.00 200,000.00


208 Lem Kayu 0.5000 Kg 30,000.00 15,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 652,000.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
110 Memasang Pintu dan Jendela Kaca, Kayu Klas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.8000 70,000.00 56,000.00
9 Tukang Kayu 2.4000 110,000.00 264,000.00
10 Kepala Tukang Kayu 0.2400 115,000.00 27,600.00
5 Mandor 0.0400 50,000.00 2,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

79 Papan Kayu Kls I 0.0240 M3 7,000,000.00 168,000.00


208 Lem Kayu 0.3000 Kg 30,000.00 9,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 526,600.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


111 Memasang Pintu dan Jendela Kaca, Kayu Klas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.8000 70,000.00 56,000.00
9 Tukang Kayu 2.4000 110,000.00 264,000.00
10 Kepala Tukang Kayu 0.2400 115,000.00 27,600.00
5 Mandor 0.0400 50,000.00 2,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
84 Papan Kayu Kls II 0.0240 M3 5,000,000.00 120,000.00
208 Lem Kayu 0.3000 Kg 30,000.00 9,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 478,600.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
112 Memasang Jalusi Kusen, Kayu Klas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.6700 70,000.00 46,900.00
9 Tukang Kayu 2.0000 110,000.00 220,000.00
10 Kepala Tukang Kayu 0.2000 115,000.00 23,000.00
5 Mandor 0.3350 50,000.00 16,750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
79 Papan Kayu Kls I 0.0600 M3 7,000,000.00 420,000.00
271 Paku Panjang 1 - 3 cm 0.1500 Kg 21,000.00 3,150.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 729,800.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


113 Memasang Jalusi Kusen, Kayu Klas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.6700 70,000.00 46,900.00
9 Tukang Kayu 2.0000 110,000.00 220,000.00
10 Kepala Tukang Kayu 0.2000 115,000.00 23,000.00
5 Mandor 0.3350 50,000.00 16,750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

84 Papan Kayu Kls II 0.0600 M3 5,000,000.00 300,000.00


271 Paku Panjang 1 - 3 cm 0.1500 Kg 21,000.00 3,150.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 609,800.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
114 Pasang Teakwood Rangkap, Rangka Expose Kayu Klas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.8000 70,000.00 56,000.00
9 Tukang Kayu 2.4000 110,000.00 264,000.00
10 Kepala Tukang Kayu 0.2400 115,000.00 27,600.00
5 Mandor 0.0400 50,000.00 2,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
79 Papan Kayu Kls I 0.0250 M3 7,000,000.00 175,000.00
271 Paku Panjang 1 - 3 cm 0.0300 Kg 21,000.00 630.00
208 Lem Kayu 0.3000 Kg 30,000.00 9,000.00
205 Teakwood 120 x 240 x 3 mm 1.0000 Lembar 100,000.00 100,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) 634,230.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


115 Memasang Teakwood Rangkap, Rangka Expose Kayu Klas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.8000 70,000.00 56,000.00
9 Tukang Kayu 2.4000 110,000.00 264,000.00
10 Kepala Tukang Kayu 0.2400 115,000.00 27,600.00
5 Mandor 0.0400 50,000.00 2,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
84 Papan Kayu Kls II 0.0250 M3 5,000,000.00 125,000.00
271 Paku Panjang 1 - 3 cm 0.0300 Kg 21,000.00 630.00
208 Lem Kayu 0.3000 Kg 30,000.00 9,000.00
205 Teakwood 120 x 240 x 3 mm 1.0000 Lembar 100,000.00 100,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 584,230.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
116 Memasang Pintu Teakwood Rangkap Lapis Formika, Rangka Expose Kayu
Klas II
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :
NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.8500 70,000.00 59,500.00
9 Tukang Kayu 2.5500 110,000.00 280,500.00
10 Kepala Tukang Kayu 0.2550 115,000.00 29,325.00
5 Mandor 0.0430 50,000.00 2,150.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
79 Papan Kayu Kls I 0.0250 M3 7,000,000.00 175,000.00
271 Paku Panjang 1 - 3 cm 0.0300 Kg 21,000.00 630.00
208 Lem Kayu 0.8000 Kg 30,000.00 24,000.00
205 Teakwood 120 x 240 x 3 mm 1.0000 Lembar 100,000.00 100,000.00
206 Formika Putih 120 x 240 x 2 mm 0.5000 Lembar 110,000.00 55,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 726,105.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


117
Memasang Konstruksi Kuda - Kuda Konvensional (Btg 6 m'), Kayu Klas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 4.0000 70,000.00 280,000.00
9 Tukang Kayu 12.0000 110,000.00 ###
10 Kepala Tukang Kayu 1.2000 115,000.00 138,000.00
5 Mandor 0.2000 50,000.00 10,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
81 Balok Kayu Kls I 1.100 M3 6,500,000.00 ###
279 Besi Beugel/Baut (Kuda-kuda) 15.000 Kg 32,000.00 480,000.00
273 Paku Panjang 7 - 12 cm 5.600 Kg 21,000.00 117,600.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
118
Memasang Konstruksi Kuda - Kuda Konvensional (Btg 6 m'), Kayu Klas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 4.000 70,000.00 280,000.00
9 Tukang Kayu 12.000 110,000.00 ###
10 Kepala Tukang Kayu 1.200 115,000.00 138,000.00
5 Mandor 0.200 50,000.00 10,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

85 Balok Kayu Kls II 1.100 M3 4,500,000.00 ###


279 Besi Beugel/Baut (Kuda-kuda) 15.000 Kg 32,000.00 480,000.00
273 Paku Panjang 7 - 12 cm 5.600 Kg 21,000.00 117,600.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


119 Memasang Konstruksi Kuda - Kuda Expose, Kayu Klas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 6.700 70,000.00 469,000.00
9 Tukang Kayu 20.100 110,000.00 ###
10 Kepala Tukang Kayu 2.010 115,000.00 231,150.00
5 Mandor 0.335 50,000.00 16,750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
81 Balok Kayu Kls I 1.200 M3 6,500,000.00 ###
279 Besi Beugel/Baut (Kuda-kuda) 15.000 Kg 32,000.00 480,000.00
273 Paku Panjang 7 - 12 cm 5.600 Kg 21,000.00 117,600.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
120 Memasang Konstruksi Kuda - Kuda Expose, Kayu Klas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 6.700 70,000.00 469,000.00


9 Tukang Kayu 20.100 110,000.00 ###
10 Kepala Tukang Kayu 2.010 115,000.00 231,150.00
5 Mandor 0.335 50,000.00 16,750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

85 Balok Kayu Kls II 1.200 M3 4,500,000.00 ###


279 Besi Beugel/Baut (Kuda-kuda) 15.000 Kg 32,000.00 480,000.00
273 Paku Panjang 7 - 12 cm 5.600 Kg 21,000.00 117,600.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


121 Memasang Konstruksi Gording, Kayu Klas I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 2.4000 70,000.00 168,000.00
9 Tukang Kayu 7.2000 110,000.00 792,000.00
10 Kepala Tukang Kayu 0.7200 115,000.00 82,800.00
5 Mandor 0.1200 50,000.00 6,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
81 Balok Kayu Kls I 1.100 M3 6,500,000.00 ###
279 Besi Beugel/Baut (Kuda-kuda) 15.000 Kg 32,000.00 480,000.00
273 Paku Panjang 7 - 12 cm 3.000 Kg 21,000.00 63,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
122 Memasang Konstruksi Gording, Kayu Klas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 2.4000 70,000.00 168,000.00
9 Tukang Kayu 7.2000 110,000.00 792,000.00
10 Kepala Tukang Kayu 0.7200 115,000.00 82,800.00
5 Mandor 0.1200 50,000.00 6,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 1.100 M3 4,500,000.00 ###
279 Besi Beugel/Baut (Kuda-kuda) 15.000 Kg 32,000.00 480,000.00
273 Paku Panjang 7 - 12 cm 3.000 Kg 21,000.00 63,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) ### Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


123 Memasang Rangka Atap Genteng Beton, Kayu Kls II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1000 70,000.00 7,000.00
9 Tukang Kayu 0.1000 110,000.00 11,000.00
10 Kepala Tukang Kayu 0.0100 115,000.00 1,150.00
5 Mandor 0.0050 50,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 0.0140 M3 4,500,000.00 63,000.00
272 Paku Panjang 4 - 6 cm 0.2500 Kg 21,000.00 5,250.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 87,650.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
124 Memasang Rangka Atap Kodok, Kayu Kls II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.1000 70,000.00 7,000.00


9 Tukang Kayu 0.1000 110,000.00 11,000.00
10 Kepala Tukang Kayu 0.0100 115,000.00 1,150.00
5 Mandor 0.0050 50,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

85 Balok Kayu Kls II 0.0120 M3 4,500,000.00 54,000.00


272 Paku Panjang 4 - 6 cm 0.1500 Kg 21,000.00 3,150.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 76,550.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


125 Memasang Rangka Atap Sirap, Kayu Kls II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.1200 70,000.00 8,400.00


9 Tukang Kayu 0.1200 110,000.00 13,200.00
10 Kepala Tukang Kayu 0.0120 115,000.00 1,380.00
5 Mandor 0.0060 50,000.00 300.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

85 Balok Kayu Kls II 0.0165 M3 4,500,000.00 74,250.00


272 Paku Panjang 4 - 6 cm 0.2000 Kg 21,000.00 4,200.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 101,730.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
126 Memasang Rangka Langit - Langit (50 x 100) cm, Kayu Kls II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1500 70,000.00 10,500.00
9 Tukang Kayu 0.3000 110,000.00 33,000.00
10 Kepala Tukang Kayu 0.0300 115,000.00 3,450.00
5 Mandor 0.0750 50,000.00 3,750.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 0.0154 M3 4,500,000.00 69,300.00
272 Paku Panjang 4 - 6 cm 0.2000 Kg 21,000.00 4,200.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 124,200.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


127 Memasang Rangka Langit - Langit (60 x 60) cm, Kayu II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.2000 70,000.00 14,000.00


9 Tukang Kayu 0.3000 110,000.00 33,000.00
10 Kepala Tukang Kayu 0.0300 115,000.00 3,450.00
5 Mandor 0.0100 50,000.00 500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 0.0163 M3 4,500,000.00 73,350.00
272 Paku Panjang 4 - 6 cm 0.2500 Kg 21,000.00 5,250.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 129,550.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
128 Memasang Lisplank ( 3 x 20 ) cm, Kayu Kls I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.1000 70,000.00 7,000.00


9 Tukang Kayu 0.0500 110,000.00 5,500.00
10 Kepala Tukang Kayu 0.0050 115,000.00 575.00
5 Mandor 0.0050 50,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

79 Papan Kayu Kls I 0.3640 M3 7,000,000.00 ###


272 Paku Panjang 4 - 6 cm 0.1100 Kg 21,000.00 2,310.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) ### Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
129 Memasang Lisplank ( 3 x 20 ) cm, Kayu Kls II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1000 70,000.00 7,000.00
9 Tukang Kayu 0.2000 110,000.00 22,000.00
10 Kepala Tukang Kayu 0.0200 115,000.00 2,300.00
5 Mandor 0.0050 50,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
84 Papan Kayu Kls II 0.0108 M3 5,000,000.00 54,000.00
272 Paku Panjang 4 - 6 cm 0.1000 Kg 21,000.00 2,100.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 87,650.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


130 Memasang Lisplank ( 3 x 30 ) cm, Kayu Kls I

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1000 70,000.00 7,000.00
9 Tukang Kayu 0.2000 110,000.00 22,000.00
10 Kepala Tukang Kayu 0.0200 115,000.00 2,300.00
5 Mandor 0.0050 50,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

79 Papan Kayu Kls I 0.0108 M3 7,000,000.00 75,600.00


272 Paku Panjang 4 - 6 cm 0.1000 Kg 21,000.00 2,100.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 109,250.00 Per
`

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


131 Memasang Lisplank ( 3 x 30 ) cm, Kayu Kls II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.1000 70,000.00 7,000.00


9 Tukang Kayu 0.2000 110,000.00 22,000.00
10 Kepala Tukang Kayu 0.0200 115,000.00 2,300.00
5 Mandor 0.0050 50,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
84 Papan Kayu Kls II 0.0110 M3 5,000,000.00 55,000.00
272 Paku Panjang 4 - 6 cm 0.0500 Kg 21,000.00 1,050.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 87,600.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


132 Memasang Lisplank ( 3 x 30 ) cm, Kayu Kls III

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.1000 70,000.00 7,000.00


9 Tukang Kayu 0.2000 110,000.00 22,000.00
10 Kepala Tukang Kayu 0.0200 115,000.00 2,300.00
5 Mandor 0.0050 50,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

89 Papan Kayu Kls III 0.0110 M3 3,000,000.00 33,000.00


272 Paku Panjang 4 - 6 cm 0.0500 Kg 21,000.00 1,050.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 65,600.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
133 Memasang Rangka Dinding Pemisah (60 x 120) cm, Kayu Kls II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1500 70,000.00 10,500.00
9 Tukang Kayu 0.4500 110,000.00 49,500.00
10 Kepala Tukang Kayu 0.0450 115,000.00 5,175.00
5 Mandor 0.0080 50,000.00 400.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
85 Balok Kayu Kls II 0.0280 M3 4,500,000.00 126,000.00
272 Paku Panjang 4 - 6 cm 0.1500 Kg 21,000.00 3,150.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 194,725.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


134 Memasang Rangka Dinding Pemisah Teakwood Rangkap, Kayu Kls II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1500 70,000.00 10,500.00
9 Tukang Kayu 0.4500 110,000.00 49,500.00
10 Kepala Tukang Kayu 0.0450 115,000.00 5,175.00
5 Mandor 0.0080 50,000.00 400.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

85 Balok Kayu Kls II 0.0280 M3 4,500,000.00 126,000.00


272 Paku Panjang 4 - 6 cm 0.1500 Kg 21,000.00 3,150.00
199 Tripleks 120 x 240 x 3 mm 0.8600 Lembar 52,000.00 44,720.00
208 Lem Kayu 0.5600 Kg 30,000.00 16,800.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) 256,245.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
135 Memasang Dinding Plywood Rangkap, Rangka Kayu Kls II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1000 70,000.00 7,000.00
9 Tukang Kayu 0.0500 110,000.00 5,500.00
10 Kepala Tukang Kayu 0.0050 115,000.00 575.00
5 Mandor 0.0050 50,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

206 Formika Putih 120 x 240 x 2 mm 1.5000 Lembar 110,000.00 165,000.00


85 Balok Kayu Kls II 0.0140 M3 4,500,000.00 63,000.00
272 Paku Panjang 4 - 6 cm 0.0120 Kg 21,000.00 252.00
243 List Kayu 0.0030 M' 12,000.00 36.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M³ HARGA SATUAN ( Rp ) 241,613.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


136 Memasang Pintu Tripleks Rangkap, Rangka Kayu Klas II

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.6000 70,000.00 42,000.00
9 Tukang Kayu 2.0000 110,000.00 220,000.00
10 Kepala Tukang Kayu 0.2000 115,000.00 23,000.00
5 Mandor 0.0300 50,000.00 1,500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

84 Papan Kayu Kls II 0.0196 M3 5,000,000.00 98,000.00


272 Paku Panjang 4 - 6 cm 0.0300 Kg 21,000.00 630.00
208 Lem Kayu 0.3000 Kg 30,000.00 9,000.00
200 Tripleks 120 x 240 x 6 mm 1.0000 Lembar 85,000.00 85,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY :M² HARGA SATUAN ( Rp ) 479,130.00 Per
KODE
A. 4.6.1.1
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

3,059,000.00
SUB TOTAL
( Rp )

7,206,250.00
SUB TOTAL
( Rp )

-
10,265,250.00

KODE

A. 4.6.1.2
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

2,622,000.00
SUB TOTAL
( Rp )

5,456,250.00
SUB TOTAL
( Rp )

-
8,078,250.00


KODE

A. 4.6.1.5.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

437,000.00
SUB TOTAL
( Rp )

295,000.00
SUB TOTAL
( Rp )

-
732,000.00

KODE

A. 4.6.1.5.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

437,000.00
SUB TOTAL
( Rp )

215,000.00
SUB TOTAL
( Rp )

-
652,000.00


KODE

A. 4.6.1.6.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

349,600.00
SUB TOTAL
( Rp )

177,000.00
SUB TOTAL
( Rp )

-
526,600.00

KODE

A. 4.6.1.6.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

349,600.00
SUB TOTAL
( Rp )

129,000.00
SUB TOTAL
( Rp )

-
478,600.00


KODE

A. 4.6.1.10.1
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

306,650.00
SUB TOTAL
( Rp )

423,150.00
SUB TOTAL
( Rp )

-
729,800.00

KODE

A. 4.6.1.10.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

306,650.00
SUB TOTAL
( Rp )

303,150.00
SUB TOTAL
( Rp )

-
609,800.00


KODE

A. 4.6.1.11.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

349,600.00
SUB TOTAL
( Rp )

284,630.00
SUB TOTAL
( Rp )

-
634,230.00

KODE

A. 4.6.1.11.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

349,600.00
SUB TOTAL
( Rp )

234,630.00
SUB TOTAL
( Rp )
-
584,230.00


KODE

A. 4.6.1.12

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

371,475.00
SUB TOTAL
( Rp )

354,630.00
SUB TOTAL
( Rp )

-
726,105.00

KODE

A. 4.6.1.13.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

1,748,000.00
SUB TOTAL
( Rp )

7,747,600.00
SUB TOTAL
( Rp )
-
9,495,600.00


KODE

A. 4.6.1.13.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

1,748,000.00
SUB TOTAL
( Rp )

5,547,600.00
SUB TOTAL
( Rp )

-
7,295,600.00

KODE

A. 4.6.1.14.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

2,927,900.00
SUB TOTAL
( Rp )

8,397,600.00
SUB TOTAL
( Rp )

-
11,325,500.00

KODE

A. 4.6.1.14.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

2,927,900.00
SUB TOTAL
( Rp )

5,997,600.00
SUB TOTAL
( Rp )

-
8,925,500.00

KODE

A. 4.6.1.15.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

1,048,800.00
SUB TOTAL
( Rp )

7,693,000.00
SUB TOTAL
( Rp )

-
8,741,800.00


KODE

A. 4.6.1.15.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

1,048,800.00
SUB TOTAL
( Rp )

5,493,000.00
SUB TOTAL
( Rp )

-
6,541,800.00

KODE

A. 4.6.1.17

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,400.00
SUB TOTAL
( Rp )

68,250.00
SUB TOTAL
( Rp )

-
87,650.00

KODE
SNI-DT 91-0011-
2007. 18
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,400.00
SUB TOTAL
( Rp )

57,150.00
SUB TOTAL
( Rp )

-
76,550.00

KODE

A. 4.6.1.18
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

23,280.00
SUB TOTAL
( Rp )

78,450.00
SUB TOTAL
( Rp )

-
101,730.00


KODE

A. 4.6.1.19

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

50,700.00
SUB TOTAL
( Rp )

73,500.00
SUB TOTAL
( Rp )

-
124,200.00

KODE

A. 4.6.1.20
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

50,950.00
SUB TOTAL
( Rp )

78,600.00
SUB TOTAL
( Rp )

-
129,550.00

KODE

A. 4.6.1.21.1
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

13,325.00
SUB TOTAL
( Rp )

2,550,310.00
SUB TOTAL
( Rp )

-
2,563,635.00


KODE

A. 4.6.1.21.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

31,550.00
SUB TOTAL
( Rp )

56,100.00
SUB TOTAL
( Rp )

-
87,650.00

KODE

A. 4.6.1.22.1

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

31,550.00
SUB TOTAL
( Rp )

77,700.00
SUB TOTAL
( Rp )

-
109,250.00

KODE

A. 4.6.1.22.2

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

31,550.00
SUB TOTAL
( Rp )

56,050.00
SUB TOTAL
( Rp )

-
87,600.00

KODE

A. 4.6.1.22.3

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

31,550.00
SUB TOTAL
( Rp )

34,050.00
SUB TOTAL
( Rp )

-
65,600.00


KODE

A. 4.6.1.23

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

65,575.00
SUB TOTAL
( Rp )

129,150.00
SUB TOTAL
( Rp )

-
194,725.00

KODE

A. 4.6.1.24

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

65,575.00
SUB TOTAL
( Rp )

190,670.00
SUB TOTAL
( Rp )

-
256,245.00


KODE

A. 4.6.1.25
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

13,325.00
SUB TOTAL
( Rp )

228,288.00
SUB TOTAL
( Rp )

-
241,613.00

KODE
SNI-DT 91-0011-
2007. 29
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

286,500.00
SUB TOTAL
( Rp )

192,630.00
SUB TOTAL
( Rp )
-
479,130.00


### M³

8,078,250.00 M³
732,000.00 M²

652,000.00 M²
526,600.00 M²

478,600.00 M²
729,800.00 M²

609,800.00 M²
634,230.00 M³

584,230.00 M²
726,105.00 M²

9,495,600.00 M³
7,295,600.00 M³

### M³
8,925,500.00 M³

8,741,800.00 M³
6,541,800.00 M³

87,650.00 M²
76,550.00 M²

101,730.00 M²
124,200.00 M²

129,550.00 M²
2,563,635.00 M²
87,650.00 M²

109,250.00 M²
87,600.00 M²

65,600.00 M²
194,725.00 M²

256,245.00 M³
241,613.00 M³

479,130.00 M²
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
137 Memasang Kunci Tanam Biasa

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.010 70,000.00 700.00
9 Tukang Kayu 0.500 110,000.00 55,000.00
10 Kepala Tukang Kayu 0.050 115,000.00 5,750.00
5 Mandor 0.005 50,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
562 Kunci Pintu 1 Slag KW II 1.0000 Buah 130,000.00 130,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 191,700.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


138 Memasang Kunci Tanam Kamar Mandi

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.005 70,000.00 350.00
9 Tukang Kayu 0.500 110,000.00 55,000.00
10 Kepala Tukang Kayu 0.050 115,000.00 5,750.00
5 Mandor 0.003 50,000.00 150.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
562 Kunci Pintu 1 Slag KW II 1.0000 Buah 130,000.00 130,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 191,250.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
139 Memasang Kunci Tanam Silinder

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.005 70,000.00 350.00
9 Tukang Kayu 0.500 110,000.00 55,000.00
10 Kepala Tukang Kayu 0.050 115,000.00 5,750.00
5 Mandor 0.003 50,000.00 150.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
561 Kunci Pintu 1 Slag KW I 1.0000 Buah 160,000.00 160,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 221,250.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


140 Memasang Engsel Pintu

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.015 70,000.00 1,050.00
9 Tukang Kayu 0.150 110,000.00 16,500.00
10 Kepala Tukang Kayu 0.015 115,000.00 1,725.00
5 Mandor 0.0008 50,000.00 40.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
573 Engsel H 1.0000 Buah 9,000.00 9,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 10 Buah HARGA SATUAN ( Rp ) 2,831.50 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
141 Memasang Engsel Jendela Kupu - Kupu

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.010 70,000.00 700.00


9 Tukang Kayu 0.100 110,000.00 11,000.00
10 Kepala Tukang Kayu 0.010 115,000.00 1,150.00
5 Mandor 0.0005 50,000.00 25.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )

572 Engsel Kupu-kupu 1.0000 Set 12,000.00 12,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 24,875.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


142 Memasang Engsel Angin

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.100 70,000.00 7,000.00


9 Tukang Kayu 0.200 110,000.00 22,000.00
10 Kepala Tukang Kayu 0.020 115,000.00 2,300.00
5 Mandor 0.0005 50,000.00 25.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
573 Engsel H 1.0000 Buah 9,000.00 9,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 40,325.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
143 Memasang Kait Angin

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.100 70,000.00 7,000.00


9 Tukang Kayu 0.200 110,000.00 22,000.00
10 Kepala Tukang Kayu 0.020 115,000.00 2,300.00
5 Mandor 0.0005 50,000.00 25.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )

568 Haag Angin Kecil 1.0000 Buah 8,000.00 8,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 39,325.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


144 Memasang Slot

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.020 70,000.00 1,400.00


9 Tukang Kayu 0.200 110,000.00 22,000.00
10 Kepala Tukang Kayu 0.020 115,000.00 2,300.00
5 Mandor 0.001 50,000.00 50.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
561 Kunci Pintu 1 Slag KW I 1.0000 Buah 160,000.00 160,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 185,750.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
145 Memasang Rel Pintu Sorong

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.060 70,000.00 4,200.00


9 Tukang Kayu 0.600 110,000.00 66,000.00
10 Kepala Tukang Kayu 0.060 115,000.00 6,900.00
5 Mandor 0.003 50,000.00 150.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )

136 Porselin Kualitas I (Polos) 1.0000 M2 66,000.00 66,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 143,250.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


146 Memasang Kunci Lemari

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH BIAYA


ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.025 70,000.00 1,750.00


9 Tukang Kayu 0.250 110,000.00 27,500.00
10 Kepala Tukang Kayu 0.025 115,000.00 2,875.00
5 Mandor 0.0013 50,000.00 65.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA BIAYA
VOLUME SATUAN ( Rp )
564 Kunci Pintu 2 Slag KW II 1.0000 Buah 110,000.00 110,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 Buah HARGA SATUAN ( Rp ) 142,190.00 Per
KODE

A. 4.6.2.2
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

61,700.00
SUB TOTAL
( Rp )

130,000.00
SUB TOTAL
( Rp )

-
191,700.00

Buah

KODE

A. 4.6.2.3
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

61,250.00
SUB TOTAL
( Rp )

130,000.00
SUB TOTAL
( Rp )

-
191,250.00

Buah
KODE
A. 4.6.2.4
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

61,250.00
SUB TOTAL
( Rp )

160,000.00
SUB TOTAL
( Rp )

-
221,250.00

Buah

KODE
A. 4.6.2.5
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,315.00
SUB TOTAL
( Rp )

9,000.00
SUB TOTAL
( Rp )

-
28,315.00

Buah
KODE
A. 4.6.2.6
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

12,875.00
SUB TOTAL
( Rp )

12,000.00
SUB TOTAL
( Rp )

-
24,875.00

Buah

KODE
A. 4.6.2.7
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

31,325.00
SUB TOTAL
( Rp )
9,000.00
SUB TOTAL
( Rp )

-
40,325.00

Buah
KODE
A. 4.6.2.9
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

31,325.00
SUB TOTAL
( Rp )

8,000.00
SUB TOTAL
( Rp )

-
39,325.00

Buah

KODE
A. 4.6.2.11
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

25,750.00
SUB TOTAL
( Rp )
160,000.00
SUB TOTAL
( Rp )

-
185,750.00

Buah
KODE
A. 4.6.2.14
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

77,250.00
SUB TOTAL
( Rp )

66,000.00
SUB TOTAL
( Rp )

-
143,250.00

Buah

KODE
A. 4.6.2.15
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

32,190.00
SUB TOTAL
( Rp )
110,000.00
SUB TOTAL
( Rp )

-
142,190.00

Buah
191,700.00 Buah

191,250.00 Buah
221,250.00 Buah

2,831.50 Buah
24,875.00 Buah

40,325.00 Buah
39,325.00 Buah

185,750.00 Buah
143,250.00 Buah

142,190.00 Buah
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
147 Memasang Kaca Polos Tebal 3 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.0150 70,000.00 1,050.00


9 Tukang Kayu 0.1500 110,000.00 16,500.00
10 Kepala Tukang Kayu 0.0150 115,000.00 1,725.00
5 Mandor 0.0008 50,000.00 40.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Kaca Polos 3 mm 1.1000 M2 78,000.00 85,800.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 105,115.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


148 Memasang Kaca Polos Tebal 5 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.0150 70,000.00 1,050.00


9 Tukang Kayu 0.1500 110,000.00 16,500.00
10 Kepala Tukang Kayu 0.0150 115,000.00 1,725.00
5 Mandor 0.0008 50,000.00 40.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Kaca Polos 5 mm 1.1000 M2 110,000.00 121,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 140,315.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
149 Memasang Kaca Riben Tebal 5 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.0170 70,000.00 1,190.00


9 Tukang Kayu 0.1700 110,000.00 18,700.00
10 Kepala Tukang Kayu 0.0170 115,000.00 1,955.00
5 Mandor 0.0009 50,000.00 45.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Kaca Riben 5 mm 1.1000 M2 118,000.00 129,800.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 151,690.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


150 Memasang Kaca Polos 3 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.015 70,000.00 1,050.00


9 Tukang Kayu 0.150 110,000.00 16,500.00
10 Kepala Tukang Kayu 0.015 115,000.00 1,725.00
5 Mandor 0.0008 50,000.00 40.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Kaca Polos 3 mm 1.1000 M2 78,000.00 85,800.00


### Sealant 1.1000 Tube 35,000.00 38,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 143,615.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
151 Memasang Kaca Polos 5 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.015 70,000.00 1,050.00


9 Tukang Kayu 0.150 110,000.00 16,500.00
10 Kepala Tukang Kayu 0.015 115,000.00 1,725.00
5 Mandor 0.00075 50,000.00 37.50

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Kaca Polos 5 mm 1.1000 M2 110,000.00 121,000.00


### Sealant 0.0500 Tube 35,000.00 1,750.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 142,063.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


152 Memasang Kaca Riben 5 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.015 70,000.00 1,050.00


9 Tukang Kayu 0.150 110,000.00 16,500.00
10 Kepala Tukang Kayu 0.015 115,000.00 1,725.00
5 Mandor 0.00075 50,000.00 37.50

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Kaca Riben 5 mm 1.1000 M2 118,000.00 129,800.00


### Sealant 0.0500 Tube 35,000.00 1,750.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 150,863.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
153 Memasang Kaca Cermin 5 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.015 70,000.00 1,050.00


9 Tukang Kayu 0.150 110,000.00 16,500.00
10 Kepala Tukang Kayu 0.015 115,000.00 1,725.00
5 Mandor 0.00075 50,000.00 37.50

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Kaca Polos 5 mm 1.1000 M2 110,000.00 121,000.00


### Sealant 0.0500 Tube 35,000.00 1,750.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 142,063.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


154 Memasang Kaca Patri 5 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.015 70,000.00 1,050.00


9 Tukang Kayu 0.150 110,000.00 16,500.00
10 Kepala Tukang Kayu 0.015 115,000.00 1,725.00
5 Mandor 0.00075 50,000.00 37.50

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

### Kaca Pateri/Motif 1.1000 M2 300,000.00 330,000.00


### Sealant 0.0500 Tube 35,000.00 1,750.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 351,063.00 Per
KODE
SNI-DT 91-
0017-2007. 17a
TANGGAL
#REF!

SUB TOTAL
( Rp )

19,315.00
SUB TOTAL
( Rp )

85,800.00
SUB TOTAL
( Rp )

-
105,115.00

KODE
SNI-DT 91-
0017-2007. 17b
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,315.00
SUB TOTAL
( Rp )

121,000.00
SUB TOTAL
( Rp )

-
140,315.00


KODE
SNI-DT 91-
0017-2007. 17b
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

21,890.00
SUB TOTAL
( Rp )

129,800.00
SUB TOTAL
( Rp )

-
151,690.00

KODE
A. 4.6.2.16
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,315.00
SUB TOTAL
( Rp )

124,300.00
SUB TOTAL
( Rp )
-
143,615.00


KODE

A. 4.6.2.17
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,312.50
SUB TOTAL
( Rp )

122,750.00
SUB TOTAL
( Rp )

-
142,062.50

KODE
A. 4.6.2.18
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,312.50
SUB TOTAL
( Rp )

131,550.00
SUB TOTAL
( Rp )
-
150,862.50


KODE
A. 4.6.2.20
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,312.50
SUB TOTAL
( Rp )

122,750.00
SUB TOTAL
( Rp )

-
142,062.50

KODE
A. 4.6.2.24
TANGGAL
Maret 2015

SUB TOTAL
( Rp )

19,312.50
SUB TOTAL
( Rp )

331,750.00
SUB TOTAL
( Rp )
-
351,062.50


105,115.00 M²

140,315.00 M²
151,690.00 M²

143,615.00 M²
142,063.00 M²

150,863.00 M²
142,063.00 M²

351,063.00 M²
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
155 Mengerok Permukaan Cat Lama

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.1500 70,000.00 10,500.00
16 Tukang Cat - 115,000.00 -
17 Kepala Tukang Cat - 110,000.00 -
5 Mandor 0.0025 50,000.00 125.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
Soda 0.0500 Kg 5,000.00 250.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 10,875.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


156 Mendempul dan Menggosok Kayu

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.0400 70,000.00 2,800.00
15 Tukang Politur 0.0400 110,000.00 4,400.00
16 Tukang Cat 0.0040 115,000.00 460.00
5 Mandor 0.0025 50,000.00 125.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
218 Plamir Kayu 0.0800 Kg 23,000.00 1,840.00
220 Minyak Cat 0.0200 Liter 23,000.00 460.00
26 Kapur Gamping/Labur 0.0100 Kg 6,000.00 60.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 10,145.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
157 Pengecetan Bidang Kayu Lama

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.0700 70,000.00 4,900.00
16 Tukang Cat 0.0750 115,000.00 8,625.00
17 Kepala Tukang Cat 0.0075 110,000.00 825.00
5 Mandor 0.0025 50,000.00 125.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
218 Plamir Kayu 0.1500 Kg 23,000.00 3,450.00
226 Cat Kayu Mutu Menengah 0.1700 Kg 40,500.00 6,885.00
227 Cat Kayu Mutu Tinggi 0.1700 Kg 50,500.00 8,585.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 33,395.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


158 Pengecetan Bidang Kayu Baru

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.0700 70,000.00 4,900.00
16 Tukang Cat 0.0090 115,000.00 1,035.00
17 Kepala Tukang Cat 0.0060 110,000.00 660.00
5 Mandor 0.0025 50,000.00 125.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )
225 Meni Kayu 0.2000 Kg 25,000.00 5,000.00
218 Plamir Kayu 0.1500 Kg 23,000.00 3,450.00
226 Cat Kayu Mutu Menengah 0.1700 Kg 40,500.00 6,885.00
227 Cat Kayu Mutu Tinggi 0.2600 Kg 50,500.00 13,130.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 35,185.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
159 Pelaburan Bidang Kayu Dengan Politur

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja - 70,000.00 -
16 Tukang Cat 0.0600 115,000.00 6,900.00
17 Kepala Tukang Cat 0.0160 110,000.00 1,760.00
5 Mandor 0.0025 50,000.00 125.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

196 Politur dasar 0.1500 Kg 44,000.00 6,600.00


234 Politur 0.3720 Liter 47,000.00 17,484.00
217 Amplas Kayu 2.0000 Lembar 5,000.00 10,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 42,869.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


160 Pelaburan Bidang Kayu Dengan Cat Residu dan Teer

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.100 70,000.00 7,000.00


16 Tukang Cat - 115,000.00 -
17 Kepala Tukang Cat - 110,000.00 -
5 Mandor 0.006 50,000.00 300.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

222 Residu 0.3500 Liter 17,500.00 6,125.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 13,425.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
161 Pengecetan Tembok Baru

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )
4 Pekerja 0.0200 70,000.00 1,400.00
16 Tukang Cat 0.0630 115,000.00 7,245.00
17 Kepala Tukang Cat 0.0063 110,000.00 693.00
5 Mandor 0.0025 50,000.00 125.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

232 Plamir Tembok 0.1000 Kg 20,000.00 2,000.00


228 Cat Tmbk Mutu Menengah 0.1000 Kg 31,000.00 3,100.00
229 Cat Tmbk Mutu Tinggi 0.2600 Kg 47,000.00 12,220.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 26,783.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


162 Pengecetan Tembok Lama

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.0280 70,000.00 1,960.00


16 Tukang Cat 0.0420 115,000.00 4,830.00
17 Kepala Tukang Cat 0.0042 110,000.00 462.00
5 Mandor 0.0025 50,000.00 125.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

228 Cat Tmbk Mutu Menengah 0.1200 Kg 31,000.00 3,720.00


229 Cat Tmbk Mutu Tinggi 0.1800 Kg 47,000.00 8,460.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 19,557.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
163 Pengecetan Permukaan Baja dengan Meni Besi

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.0200 70,000.00 1,400.00


16 Tukang Cat 0.2000 115,000.00 23,000.00
17 Kepala Tukang Cat 0.0200 110,000.00 2,200.00
5 Mandor 0.0100 50,000.00 500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

224 Meni Besi 0.1000 Kg 25,000.00 2,500.00


238 Kuas sedang 0.0100 Buah 16,000.00 160.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 29,760.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


164 Pengecetan Permukaan Baja dengan Cat Besi

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

4 Pekerja 0.0200 70,000.00 1,400.00


16 Tukang Cat 0.2000 115,000.00 23,000.00
17 Kepala Tukang Cat 0.0200 110,000.00 2,200.00
5 Mandor 0.0100 50,000.00 500.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

230 Cat Besi 0.1000 Kg 55,000.00 5,500.00


238 Kuas sedang 0.0100 Buah 16,000.00 160.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 32,760.00 Per
KODE
A. 4.7.1.1
TANGGAL
#REF!

SUB TOTAL
( Rp )

10,625.00
SUB TOTAL
( Rp )

250.00
SUB TOTAL
( Rp )

-
10,875.00

KODE
SNI-DT 91-0018-
2007. 6
TANGGAL
#REF!

SUB TOTAL
( Rp )

7,785.00
SUB TOTAL
( Rp )

2,360.00
SUB TOTAL
( Rp )

-
10,145.00


KODE
SNI-DT 91-0018-
2007. 7
TANGGAL
#REF!

SUB TOTAL
( Rp )

14,475.00
SUB TOTAL
( Rp )

18,920.00
SUB TOTAL
( Rp )

-
33,395.00

KODE
A. 4.7.1.4
TANGGAL
#REF!

SUB TOTAL
( Rp )

6,720.00
SUB TOTAL
( Rp )

28,465.00
SUB TOTAL
( Rp )
-
35,185.00


KODE
A. 4.7.1.7
TANGGAL
#REF!

SUB TOTAL
( Rp )

8,785.00
SUB TOTAL
( Rp )

34,084.00
SUB TOTAL
( Rp )

-
42,869.00

KODE

A. 4.7.1.8

TANGGAL
#REF!

SUB TOTAL
( Rp )

7,300.00
SUB TOTAL
( Rp )

6,125.00
SUB TOTAL
( Rp )
-
13,425.00


KODE
A. 4.7.1.10
TANGGAL
#REF!

SUB TOTAL
( Rp )

9,463.00
SUB TOTAL
( Rp )

17,320.00
SUB TOTAL
( Rp )

-
26,783.00

KODE
SNI-DT 91-0018-
2007. 15
TANGGAL
#REF!

SUB TOTAL
( Rp )

7,377.00
SUB TOTAL
( Rp )

12,180.00
SUB TOTAL
( Rp )
-
19,557.00


KODE
A. 4.7.1.16
TANGGAL
#REF!

SUB TOTAL
( Rp )

27,100.00
SUB TOTAL
( Rp )

2,660.00
SUB TOTAL
( Rp )

-
29,760.00

KODE
SNI-DT 91-0018-
2007. 20b
TANGGAL
#REF!

SUB TOTAL
( Rp )

27,100.00
SUB TOTAL
( Rp )

5,660.00
SUB TOTAL
( Rp )
-
32,760.00


10,875.00 M²

10,145.00 M²
33,395.00 M²

35,185.00 M²
42,869.00 M²

13,425.00 M²
26,783.00 M²

19,557.00 M²
29,760.00 M²

32,760.00 M²
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
172 Pasangan Batu Kali 1pc : 5 Ps

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

5 Mandor 0.1800 50,000.00 9,000.00


1 Buruh Tak Terampil 3.6000 60,000.00 216,000.00
6 Tukang Batu 1.2000 110,000.00 132,000.00
7 Kepala Tukang Batu 0.1200 115,000.00 13,800.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

2 Batu Kali Belah 1.2000 M3 130,000.00 156,000.00


33 PC. Merk Tiga Roda (50 Kg) 2.6894 Zak 77,000.00 207,083.80
22 Pasir Pasang 0.5350 M3 145,000.00 77,575.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 811,458.80 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


173 Pasangan Paving Blok ( Type bata )

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

5 Mandor 0.0430 50,000.00 2,150.00


4 Pekerja 0.4000 70,000.00 28,000.00
6 Tukang Batu 0.2290 110,000.00 25,190.00
7 Kepala Tukang Batu 0.0430 115,000.00 4,945.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

121 Paving Blok Press Type Bata 42.000 Biji 1,900.00 79,800.00
22 Pasir Pasang 0.100 M3 145,000.00 14,500.00
33 PC. Merk Tiga Roda (50 Kg) 0.002 Zak 77,000.00 154.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )
SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 154,739.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
174 Pasangan Paving Blok ( Type Tiga berlian )

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

5 Mandor 0.0430 50,000.00 2,150.00


4 Pekerja 0.4000 70,000.00 28,000.00
6 Tukang Batu 0.2290 110,000.00 25,190.00
7 Kepala Tukang Batu 0.0430 115,000.00 4,945.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

122 Paving Blok Biasa Type Berl 36.0000 Biji 2,700.00 97,200.00
22 Pasir Pasang 0.1000 M3 145,000.00 14,500.00
33 PC. Merk Tiga Roda (50 Kg) 0.0020 Zak 77,000.00 154.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 172,139.00 Per

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


175 Pemasangan Bronjong Kawat Ukuran 3 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

5 Mandor 0.0400 50,000.00 2,000.00


4 Pekerja 1.4000 70,000.00 98,000.00
6 Tukang Batu 0.2000 110,000.00 22,000.00
7 Kepala Tukang Batu 0.0800 115,000.00 9,200.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

1 Batu Kali Alam 1.000 M3 125,000.00 125,000.00


191 Kawat Bronjong Digalvanisir 3 mm 12.00 Kg 25,000.00 300,000.00
352 Alat Bantu Pengairan 0.132 Set 65,000.00 8,580.00
64 Ijuk Bronjong 5.000 Kg 12,500.00 62,500.00
93 Dolken/Perancah Diameter 10 cm 2.000 Batang 40,000.00 80,000.00
SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 707,280.00 Per
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
176 Pemasangan Bronjong Kawat Ukuran 4 mm

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH BIAYA


PEKERJA
ORANG OH (Rp/Org/Hari) ( Rp )

5 Mandor 0.0400 50,000.00 2,000.00


4 Pekerja 1.4000 70,000.00 98,000.00
6 Tukang Batu 0.2000 110,000.00 22,000.00
7 Kepala Tukang Batu 0.0800 115,000.00 9,200.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA BIAYA
MATERIAL
VOLUME SATUAN ( Rp )

1 Batu Kali Alam 1.000 M3 125,000.00 125,000.00


192 Kawat Bronjong Digalvanisir 4 mm 12.00 Kg 29,000.00 348,000.00
352 Alat Bantu Pengairan 0.132 Set 65,000.00 8,580.00
64 Ijuk Bronjong 5.000 Kg 12,500.00 62,500.00
93 Dolken/Perancah Diameter 10 cm 2.000 Batang 40,000.00 80,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA BIAYA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam ) ( Rp )

SUB JUMLAH ( Rp )
TOTAL (Rp)
VOLUME
QUANTITY : 1.00 M³ HARGA SATUAN ( Rp ) 755,280.00 Per
KODE
G. 31hd

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

370,800.00
SUB TOTAL
( Rp )

440,658.80
SUB TOTAL
( Rp )

-
811,458.80

KODE
SP.Xa

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

60,285.00
SUB TOTAL
( Rp )

94,454.00
SUB TOTAL
( Rp )
-
154,739.00


KODE
SP.Xb

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

60,285.00
SUB TOTAL
( Rp )

111,854.00
SUB TOTAL
( Rp )

-
172,139.00

KODE
K. 815 a

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

131,200.00
SUB TOTAL
( Rp )
576,080.00
SUB TOTAL
( Rp )

-
707,280.00


KODE
K. 815 b

TANGGAL
Maret 2015

SUB TOTAL
( Rp )

131,200.00
SUB TOTAL
( Rp )

624,080.00
SUB TOTAL
( Rp )

-
755,280.00


811,458.80 M³

154,739.00 M²
172,139.00 M²

707,280.00 M³
755,280.00 M³
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
177 Memasang Kran Diameter 3/4"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0360 70,000.00


19 Tukang Pipa 0.0600 110,000.00
18 Kepala Tukang Pipa 0.0060 115,000.00
5 Mandor 0.0018 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

265 Kran Air 3/4" KW I 1.0000 Satuan 41,000.00


560 Seltip Kecil 0.0250 Satuan 2,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 50,900.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


178 Memasang Pipa Galvanis 3/4"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.054 70,000.00


19 Tukang Pipa 0.090 110,000.00
18 Kepala Tukang Pipa 0.009 115,000.00
5 Mandor 0.027 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

560 Seltip Kecil 0.0250 Satuan 2,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 16,127.50
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
179 Memasang Pipa Galvanis 1"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.054 70,000.00


19 Tukang Pipa 0.090 110,000.00
18 Kepala Tukang Pipa 0.009 115,000.00
5 Mandor 0.027 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

560 Seltip Kecil 0.3330 Satuan 2,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 16,897.50

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


180 Memasang Pipa Galvanis 3"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)
4 Pekerja 0.135 70,000.00
19 Tukang Pipa 0.225 110,000.00
18 Kepala Tukang Pipa 0.023 115,000.00
5 Mandor 0.007 50,000.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

560 Seltip Kecil 1.6660 Satuan 2,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 41,360.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
181 Memasang Pipa Galvanis 4"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)
4 Pekerja 0.135 70,000.00
19 Tukang Pipa 0.225 110,000.00
18 Kepala Tukang Pipa 0.023 115,000.00
5 Mandor 0.007 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN
560 Seltip Kecil 2.5000 Satuan 2,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 43,445.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


182 Memasang Pipa PVC Diameter 1/2" Type AW

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0360 70,000.00


19 Tukang Pipa 0.0600 110,000.00
18 Kepala Tukang Pipa 0.0060 115,000.00
5 Mandor 0.0020 50,000.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

559 Lem Pipa 0.0053 Kg 140,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 10,652.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
183 Memasang Pipa PVC Diameter 3/4" Type AW

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0360 70,000.00


19 Tukang Pipa 0.0600 110,000.00
18 Kepala Tukang Pipa 0.0060 115,000.00
5 Mandor 0.0020 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

559 Lem Pipa 0.0058 Kg 140,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 10,722.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


184 Memasang Pipa PVC Diameter 1" Type AW

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0360 70,000.00


19 Tukang Pipa 0.0600 110,000.00
18 Kepala Tukang Pipa 0.0060 115,000.00
5 Mandor 0.0018 50,000.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

559 Lem Pipa 0.0088 Kg 140,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 11,132.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
185 Memasang Pipa PVC Diameter 2" Type AW

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0540 70,000.00


19 Tukang Pipa 0.0900 110,000.00
18 Kepala Tukang Pipa 0.0090 115,000.00
5 Mandor 0.0027 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

559 Lem Pipa 0.0125 Kg 140,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 16,600.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


186 Memasang Pipa PVC Diameter 3" Type AW

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0810 70,000.00


19 Tukang Pipa 0.1350 110,000.00
18 Kepala Tukang Pipa 0.0135 115,000.00
5 Mandor 0.0040 50,000.00
SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

559 Lem Pipa 0.0125 Kg 140,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 24,022.50
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
187 Memasang Pipa PVC Diameter 4" Type AW

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0810 70,000.00


19 Tukang Pipa 0.1350 110,000.00
18 Kepala Tukang Pipa 0.0135 115,000.00
5 Mandor 0.0040 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

559 Lem Pipa 0.1950 Kg 140,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 49,572.50

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


188 Memasang Pipa PVC Diameter 2"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0810 70,000.00


19 Tukang Pipa 0.0410 110,000.00
5 Mandor 0.0080 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

559 Lem Pipa 0.0125 Kg 140,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 12,330.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
189 Memasang Pipa PVC Diameter 3"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0940 70,000.00


19 Tukang Pipa 0.0470 110,000.00
5 Mandor 0.0090 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

559 Lem Pipa 0.0125 Kg 140,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 13,950.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


190 Memasang Pipa PVC Diameter 4"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.1050 70,000.00


19 Tukang Pipa 0.0530 110,000.00
5 Mandor 0.0110 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
MATERIAL
VOLUME SATUAN

559 Lem Pipa 0.1950 Kg 140,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 41,030.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
191 Memasang Pipa PVC Diameter 6"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.1180 70,000.00


19 Tukang Pipa 0.0590 110,000.00
5 Mandor 0.0120 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

559 Lem Pipa 0.1950 Kg 140,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 42,650.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


192 Memasang Pipa HDPE Diameter 2"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0350 70,000.00


19 Tukang Pipa 0.0170 110,000.00
5 Mandor 0.0030 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
MATERIAL
VOLUME SATUAN

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 4,470.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
193 Memasang Pipa HDPE Diameter 4"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0400 70,000.00


19 Tukang Pipa 0.0200 110,000.00
5 Mandor 0.0040 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 5,200.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


194 Memasang Pipa GIP Diameter 1"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.054 70,000.00


19 Tukang Pipa 0.090 110,000.00
5 Mandor 0.027 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
MATERIAL
VOLUME SATUAN

560 Seltip Kecil 0.3330 Satuan 2,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 15,862.50
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
195 Memasang Pipa GIP Diameter 3"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.135 70,000.00


19 Tukang Pipa 0.225 110,000.00
5 Mandor 0.007 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

560 Seltip Kecil 1.6660 Satuan 2,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 38,715.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


196 Memasang Pipa GIP Diameter 4"

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.135 70,000.00


19 Tukang Pipa 0.225 110,000.00
5 Mandor 0.007 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
MATERIAL
VOLUME SATUAN

560 Seltip Kecil 2.5000 Satuan 2,500.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M' HARGA SATUAN ( Rp ) 40,800.00
PEKERJAAN KODE
Diameter 3/4" 50,900.00 M'
A. 5.1.1.19
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

2,520.00 0.324
6,600.00 0.54
690.00
90.00

UMLAH ( Rp ) 9,900.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

41,000.00
62.50

UMLAH ( Rp ) 41,000.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 50,900.00

Per M'

PEKERJAAN KODE
alvanis 3/4" 16,127.50 M'
A. 5.1.1.20
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

3,780.00
9,900.00
1,035.00
1,350.00

UMLAH ( Rp ) 16,065.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

62.50

UMLAH ( Rp ) 62.50
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 16,127.50

Per M'
PEKERJAAN KODE
Galvanis 1" 16,897.50 M'
A. 5.1.1.21
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

3,780.00
9,900.00
1,035.00
1,350.00

UMLAH ( Rp ) 16,065.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

832.50

UMLAH ( Rp ) 832.50
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 16,897.50

Per M'

PEKERJAAN KODE
Galvanis 3" 41,360.00 M'
A. 5.1.1.23
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )
9,450.00
24,750.00
2,645.00
350.00
UMLAH ( Rp ) 37,195.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

4,165.00

UMLAH ( Rp ) 4,165.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 41,360.00

Per M'
PEKERJAAN KODE
Galvanis 4" 43,445.00 M'
A. 5.1.1.24

DISIAPKAN OLEH : TANGGAL


SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )
9,450.00
24,750.00
2,645.00
350.00

UMLAH ( Rp ) 37,195.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
6,250.00

UMLAH ( Rp ) 6,250.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 43,445.00

Per M'

PEKERJAAN KODE
meter 1/2" Type AW 10,652.00 M'
A. 5.1.1.25
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

2,520.00
6,600.00
690.00
100.00
UMLAH ( Rp ) 9,910.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

742.00

UMLAH ( Rp ) 742.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 10,652.00

Per M'
PEKERJAAN KODE
meter 3/4" Type AW 10,722.00 M'
A. 5.1.1.25
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

2,520.00
6,600.00
690.00
100.00

UMLAH ( Rp ) 9,910.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

812.00

UMLAH ( Rp ) 812.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 10,722.00

Per M'

PEKERJAAN KODE
ameter 1" Type AW 11,132.00 M'
A. 5.1.1.26
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

2,520.00
6,600.00
690.00
90.00
UMLAH ( Rp ) 9,900.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

1,232.00

UMLAH ( Rp ) 1,232.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 11,132.00

Per M'
PEKERJAAN KODE
ameter 2" Type AW 16,600.00 M'
A. 5.1.1.29
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

3,780.00
9,900.00
1,035.00
135.00

UMLAH ( Rp ) 14,850.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

1,750.00

UMLAH ( Rp ) 1,750.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 16,600.00

Per M'

PEKERJAAN KODE
ameter 3" Type AW 24,022.50 M'
A. 5.1.1.31
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

5,670.00
14,850.00
1,552.50
200.00
UMLAH ( Rp ) 22,272.50
BIAYA SUB TOTAL
( Rp ) ( Rp )

1,750.00

UMLAH ( Rp ) 1,750.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 24,022.50

Per M'
PEKERJAAN KODE
ameter 4" Type AW 49,572.50 M'
A. 5.1.1.32
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

5,670.00
14,850.00
1,552.50
200.00

UMLAH ( Rp ) 22,272.50
BIAYA SUB TOTAL
( Rp ) ( Rp )

27,300.00

UMLAH ( Rp ) 27,300.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 49,572.50

Per M'

PEKERJAAN KODE
C Diameter 2" 12,330.00 M'
A. 8.4.1.1
DISIAPKAN OLEH : TANGGAL 1.1
SMKN 10 BIMA Maret 2015 0.0384
28.6458

BIAYA SUB TOTAL


( Rp ) ( Rp )

5,670.00
4,510.00
400.00

UMLAH ( Rp ) 10,580.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

1,750.00

UMLAH ( Rp ) 1,750.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 12,330.00

Per M'
PEKERJAAN KODE
C Diameter 3" 13,950.00 M'
A. 8.4.1.2
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

6,580.00
5,170.00
450.00

UMLAH ( Rp ) 12,200.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

1,750.00

UMLAH ( Rp ) 1,750.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 13,950.00

Per M'

PEKERJAAN KODE
C Diameter 4" 41,030.00 M'
A. 8.4.1.3
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

7,350.00
5,830.00
550.00

UMLAH ( Rp ) 13,730.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

27,300.00

UMLAH ( Rp ) 27,300.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 41,030.00

Per M'
PEKERJAAN KODE
C Diameter 6" - M'
A. 8.4.1.4
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

8,260.00
6,490.00
600.00

UMLAH ( Rp ) 15,350.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

27,300.00

UMLAH ( Rp ) 27,300.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 42,650.00

Per M'

PEKERJAAN KODE
PE Diameter 2" 4,470.00 M'
A. 8.4.1.17
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

2,450.00
1,870.00
150.00

UMLAH ( Rp ) 4,470.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 4,470.00

Per M'
PEKERJAAN KODE
PE Diameter 4" 5,200.00 M'
A. 8.4.1.18
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

2,800.00
2,200.00
200.00

UMLAH ( Rp ) 5,200.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 5,200.00

Per M'

PEKERJAAN KODE
P Diameter 1" 15,862.50 M'
A. 8.4.1.34
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

3,780.00
9,900.00
1,350.00

UMLAH ( Rp ) 15,030.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

832.50

UMLAH ( Rp ) 832.50
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 15,862.50

Per M'
PEKERJAAN KODE
P Diameter 3" 38,715.00 M'
A. 8.4.1.35
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

9,450.00
24,750.00
350.00

UMLAH ( Rp ) 34,550.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

4,165.00

UMLAH ( Rp ) 4,165.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 38,715.00

Per M'

PEKERJAAN KODE
P Diameter 4" 40,800.00 M'
A. 8.4.1.36
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

9,450.00
24,750.00
350.00

UMLAH ( Rp ) 34,550.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

6,250.00

UMLAH ( Rp ) 6,250.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 40,800.00

Per M'
0.054
0.09
0
0
0
0
m3
PEMERINTAH KABUPATEN BIMA
DINAS PENDIDIKAN PEMUDA DAN OLAH
SMK NEGERI 10 BIMA
Jalan Lintas Teke Palibelo - Bima Email smkn10_bima@yaho

REKAPITULASI HARGA SATUAN PEKER


Tahun Anggaran 2016
NO URAIAN PEKERJAAN SAT KODE ANALISA

1 2 3 4

DIVISI 1. PEKERJAAN PERSIAPAN


1 Pengukuran dan Pemasangan Bouwplank M' SNI-DT 91-0005-2007. 4

2 Pembersihan Lapangan M² SNI-DT 91-0005-2007. 8

3 Pembuatan Jalan Sementara M³ SNI-DT 91-0005-2007. 12

4 Bongkaran Beton Bertulang M³ SNI-DT 91-0005-2007. 13

5 Bongkaran Dinding Tembok Bata Merah M³ SNI-DT 91-0005-2007. 14

6 Pasang Pagar Kawat Jaring Galvanis, Tinggi 100 cm M¹ SNI-DT 91-0005-2007. 15

DIVISI 2. PEKERJAAN TANAH


7 Menggali Tanah Biasa Sedalam 1m' M³ A. 2.3.1.1

8 Menggali Tanah Biasa Sedalam 2m' M³ A. 2.3.1.2

9 Menggali Tanah Keras Sedalam 1 m' M³ A. 3.2.1.4

10 Menggali Tanah Cadas Sedalam 1 m' M³ A. 3.2.1.5

11 Menggali Tanah Lumpur Sedalam 1 m' M³ A. 3.2.1.6

12 Mengerjakan Stripping Setinggi 1 m' M³ A. 3.2.1.7

13 Membuang Tanah Sejauh 30 m' M³ A. 2.3.1.8

14 Urugan Kembali Galian Tanah Biasa Sedalam 1 m' M³ A. 2.3.1.9.1

15 Urugan Kembali Galian Tanah Biasa Sedalam 2 m' M³ A. 2.3.1.9.2

16 Urugan Kembali Galian Tanah Keras Sedalam 1 m' M³ A. 2.3.1.9.3

17 Urugan Kembali Galian Tanah Cadas Sedalam 1 m' M³ A. 2.3.1.9.4

18 Pemadatan Tanah ( Per 20 cm ) M³ A. 3.2.1.10

19 Mengurug dengan Pasir Urug M³ A. 3.2.1.11

20 Urugan Sirtu Untuk Lantai Bangunan M³ A. 3.2.1.15

21 Tanah Urug Biasa M³SNI-DT 91-0006-2007. 15a

22 Tanah Urug Pilihan M³SNI-DT 91-0006-2007. 15b

23 Pemasangan Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan M³ A. 3.2.1.14

DIVISI 3. PEKERJAAN PASANGAN


24 Memasang Pondasi 1Pc : 3Ps M³ A. 3.2.1.1

25 Memasang Pondasi Batu Kali 1Pc : 4Ps M³ A. 3.2.1.2

26 Memasang Pondasi Batu Kali 1Pc : 5Ps M³ A. 3.2.1.3

27 Memasang Pondasi Batu Kali 1Pc : 6Ps M³ A. 3.2.1.4

28 Memasang Pondasi Batu Kosong M³ A. 3.2.1.9

29 Memasang Pondasi Sumuran Diameter 100 cm M³ A. 3.2.1.11

DIVISI 4.1 PEKERJAAN BETON


30 Membuat Beton Mutu ( K.100) M³ A. 4.1.1.1

31 Membuat Beton Mutu ( K.125) M³ A. 4.1.1.2

32 Membuat Beton Lantai Kerja Mutu ( K.100) M³ A. 4.1.1.4

33 Membuat Beton Mutu ( K.175) M³ A. 4.1.1.5

34 Membuat Beton Mutu ( K.225) M³ A. 4.1.1.7

35 Membuat Beton Mutu ( K.250) M³ A. 4.1.1.8

36 Membuat Beton Mutu ( K.275) M³ A 4.1.1.9

37 Pembesian Dengan Besi Beton Polos / Ulir Kg A. 4.1.1.17

38 Memasang Begisting Untuk Pondasi M² A. 4.1.1.20

39 Memasang Begisting Untuk Sloof M² A. 4.1.1.21

40 Memasang Begisting Untuk Kolom M² A. 4.1.1.22

41 Memasang Begisting Untuk Balok M² A. 4.1.1.23

42 Memasang Begisting Untuk Lantai M² A. 4.1.1.24

43 Pasang Begisting Untuk Dinding M² A. 4.1.1.25

44 Memasang Begisting Untuk Tangga M² A. 4.1.1.26

45 Memasang Jembatan Untuk pengecoran Beton M² A. 4.1.1.27

46 Membuat Kolom Praktis Beton Bertulang (11 x 11) cm M' A. 4.1.1.35

47 Membuat Ring Balok Beton Bertulang (10 x 15) cm M' A. 4.1.1.36

DIVISI 4.2 PEKERJAAN BESI & BAJA


48 Memasang Baja Profil Kg A. 4.2.1.1

49 Memasang Rangka Kuda - Kuda Baja IWF Kg A. 4.2.1.2

50 Mengerjakan 100 Kg Perakitan Baja Kg A. 4.2.1.3

51 Membuat Pintu Plat Baja Tebal 2 mm Rangkap, Rangka Baja M² A. 4.2.1.4

52 Mengelas 10 cm Dengan Las Listrik Cm² A. 4.2.1.5

53 Memasang Pintu Rolling Door Besi M² A. 4.2.1.7

54 Memasang Pintu Folding Door M² A. 4.2.1.8

55 Memasang Kusen Pintu Aluminium M' A. 4.2.1.11

55.a Pemasangan Rangka Atap baja Ringan M2 SNI-DT 91-0014-2007.6

55.b Pasang Daun Pintu dan Jendela Kaca Rangka Aluminium M2 SNI-7393:2008-6.13
DIVISI 4.3 PEKERJAAN DINDING
56 Pasangan Bata Merah Tebal 1 Bata, 1Pc : 2Ps M² A. 4.4.1.1

57 Pasangan Bata Merah Tebal 1 Bata, 1Pc : 3Ps M² A. 4.4.1.2

58 Pasangan Bata Merah Tebal 1 Bata, 1Pc : 5Ps M² A. 4.4.1.4

59 Pasangan Bata Merah Tebal 1/2 Bata, 1Pc : 2Ps M² A. 4.4.1.7

60 Pasangan Bata Merah Tebal 1/2 Bata, 1Pc : 3Ps M² A. 4.4.1.8

61 Pasangan Bata Merah Tebal 1/2 Bata, 1Pc : 5Ps M² A. 4.4.1.10

62 Pasangan Dinding Roster / Terawang, 1Pc : 3Ps M² A. 4.4.1.22

63 Pasangan Dinding Roster / Terawang, 1Pc : 4Ps M² A. 4.4.1.23

DIVISI 4.4 PEKERJAAN PLESTERAN


64 Plesteran Dinding Tebal 15 mm 1Pc : 2Ps M² A. 4.4.2.2

65 Plesteran Dinding Tebal 15 mm 1Pc : 3Ps M² A. 4.4.2.3

66 Plesteran Dinding Tebal 15 mm 1Pc : 5Ps M² A. 4.4.2.5

67 Plesteran Dinding Tebal 20 mm 1Pc : 2Ps M² A. 4.4.2.13

68 Plesteran Dinding Tebal 20 mm 1Pc : 3Ps M² A. 4.4.2.14

69 Plesteran Dinding Tebal 20 mm 1Pc : 5Ps M² A. 4.4.2.16

70 Plesteran Skoning 1Pc : 2Ps Lebar 10 cm M² A. 4.4.2.20

71 Plesteran Teraso 1Pc : 2Ps Tebal 10 cm M² A. 4.4.2.22

72 Plesteran Ciprat, 1Pc : 2Ps M² A. 4.4.2.23

73 Finishing Siar Adukan 1Pc : 2Ps M² A. 4.4.2.26

74 Memasang Acian M² A. 4.4.2.27

DIVISI 4.5 PEKERJAAN PENUTUP LANTAI & DINDING


75 Memasang Lantai Ubin PC Abu - Abu ( 20 x 20 ) cm M² A. 4.4.3.1

76 Memasang Lantai Ubin Warna ( 20 x 20 ) cm M² A. 4.4.3.6

77 Memasang Lantai Ubin Teraso ( 30 x 30 ) cm M² A. 4.4.3.8

78 Memasang Lantai Keramik ( 30 x 30 ) cm Kwalitas I M² A. 4.4.3.35.1

79 Memasang Lantai Keramik ( 30 x 30 ) cm Kwalitas II M² A. 4.4.3.35.2

80 Memasang Dinding Porselin ( 10 x 20 ) cm Kwalitas I M² A. 4.4.3.49.1

81 Memasang Dinding Porselin ( 10 x 20 ) cm Kwalitas II M² A. 4.4.3.49.2

82 Memasang Dinding Porselin ( 20 x 20 ) cm Kwalitas I M² A. 4.4.3.50.1

83 Memasang Dinding Porselin ( 20 x 20 ) cm Kwalitas II M² A. 4.4.3.50.2

84 Memasang Dinding Keramik ( 20 x 20 ) cm Kwalitas I M² A. 4.4.3.54.1

85 Memasang Dinding Marmer ( 100 x 100 ) cm Kwalitas I M² A. 4.4.3.55

86 Memasang Dinding Batu Tempel M² SNI-DT 91-0012-2007. 58

DIVISI 4.6 PEKERJAAN PLAFOND


87 Memasang Langit - Langit Tripleks ( 120 x 240 ) cm, Tebal 3 mm M² A. 4.5.2.5
87.a Memasang Langit - Langit Tripleks ( 120 x 240 ) cm, Tebal 3 mm M2 A. 4.5.2.5.a

88 Memasang Langit - Langit Lambriziring Kayu, Tebal 9 mm M² A. 4.5.2.6

89 Memasang Langit - Langit Gypsum Board Tebal 9 mm M² A. 4.5.2.7

90 Memasang List Langit - Langit Gypsum M² A. 4.5.2.8

91 Memasang List Langit - Langit Kayu Profil M' A. 4.5.2.10

91.a Pasang Langit-langit Gypsum Rangka Hallow M2 SNI-DT 91-0013-2007.10

DIVISI 4.7 PEKERJAAN PENUTUP ATAP


92 Memasang Atap Genteng Kodok / Silang M² A. 4.5.2.2

93 Memasang Bubungan Genteng Kodok / Silang M' A. 4.5.2.5

94 Memasang Atap Asbes Gelombang Besar M² SNI-DT 91-0015-2007. 8

95 Memasang Atap Asbes Gelombang Kecil M² SNI-DT 91-0015-2007. 11

96 Memasang Atap Asbes Gelombang 1,05 x 2,10 x 4 mm M² A. 4.5.2.15

97 Pasang Bubungan Asbes Gelombang Kecil M' SNI-DT 91-0015-2007. 22b

98 Memasang Atap Genteng Beton M' A. 4.5.2.30

99 Memasang Atap Genteng Metal M² A. 4.5.2.32

100 Memasang Bubungan Genteng Beton M² A. 4.5.2.34

101 Memasang Bubungan Genteng Metal M' A. 4.5.2.36

102 Memasang Atap Seng Gelombang Besar M² A. 4.5.2.38

103 Memasang Bubungan Seng Gelombang Besar M² A. 4.5.2.39

104 Memasang Atap Genteng Pejaten M² SNI-DT 91-0015-2007. 39

105 Memasang Bubungan Pejaten M' SNI-DT 91-0015-2007. 40

DIVISI 4.8 PEKERJAAN KAYU


106 Memasang Kusen Pintu dan Jendela Kayu Klas I M³ A. 4.6.1.1

107 Memasang Kusen Pintu dan Jendela Kayu Klas II M³ A. 4.6.1.2

108 Memasang Daun Pintu Panel Kayu Klas I M² A. 4.6.1.5.1

109 Memasang Daun Pintu Panel , Kayu Klas II M² A. 4.6.1.5.2

110 Memasang Pintu dan Jendela Kaca, Kayu Klas I M² A. 4.6.1.6.1

111 Memasang Pintu dan Jendela Kaca, Kayu Klas II M² A. 4.6.1.6.2

112 Memasang Jalusi Kusen, Kayu Klas I M² A. 4.6.1.10.1

113 Memasang Jalusi Kusen, Kayu Klas II M² A. 4.6.1.10.2

114 Pasang Teakwood Rangkap, Rangka Expose Kayu Klas I M³ A. 4.6.1.11.1

115 Memasang Teakwood Rangkap, Rangka Expose Kayu Klas II M² A. 4.6.1.11.2

116 Memasang Pintu Teakwood Rangkap Lapis Formika, Rangka Expose Kayu Klas I M² A. 4.6.1.12

117 Memasang Konstruksi Kuda - Kuda Konvensional (Btg 6 m'), Kayu M³ A. 4.6.1.13.1

118 Memasang Konstruksi Kuda - Kuda Konvensional (Btg 6 m'), Kayu M³ A. 4.6.1.13.2

119 Memasang Konstruksi Kuda - Kuda Expose, Kayu Klas I M³ A. 4.6.1.14.1


120 Memasang Konstruksi Kuda - Kuda Expose, Kayu Klas II M³ A. 4.6.1.14.2

121 Memasang Konstruksi Gording, Kayu Klas I M³ A. 4.6.1.15.1

122 Memasang Konstruksi Gording, Kayu Klas II M³ A. 4.6.1.15.2

123 Memasang Rangka Atap Genteng Beton, Kayu Kls II M² A. 4.6.1.17

124 Memasang Rangka Atap Kodok, Kayu Kls II M² SNI-DT 91-0011-2007. 18

125 Memasang Rangka Atap Sirap, Kayu Kls II M² A. 4.6.1.18

126 Memasang Rangka Langit - Langit (50 x 100) cm, Kayu Kls II M² A. 4.6.1.19

127 Memasang Rangka Langit - Langit (60 x 60) cm, Kayu II M² A. 4.6.1.20

128 Memasang Lisplank ( 3 x 20 ) cm, Kayu Kls I M² A. 4.6.1.21.1

129 Memasang Lisplank ( 3 x 20 ) cm, Kayu Kls II M² A. 4.6.1.21.2

130 Memasang Lisplank ( 3 x 30 ) cm, Kayu Kls I M² A. 4.6.1.22.1

131 Memasang Lisplank ( 3 x 30 ) cm, Kayu Kls II M² A. 4.6.1.22.2

132 Memasang Lisplank ( 3 x 30 ) cm, Kayu Kls III M² A. 4.6.1.22.3

133 Memasang Rangka Dinding Pemisah (60 x 120) cm, Kayu Kls II M² A. 4.6.1.23

134 Memasang Rangka Dinding Pemisah Teakwood Rangkap, Kayu Kls M³ A. 4.6.1.24

135 Memasang Dinding Plywood Rangkap, Rangka Kayu Kls II M³ A. 4.6.1.25

136 Memasang Pintu Tripleks Rangkap, Rangka Kayu Klas II M² SNI-DT 91-0011-2007. 29

DIVISI 4.9 PEKERJAAN KUNCI


137 Memasang Kunci Tanam Biasa Buah A. 4.6.2.2

138 Memasang Kunci Tanam Kamar Mandi Buah A. 4.6.2.3

139 Memasang Kunci Tanam Silinder Buah A. 4.6.2.4

140 Memasang Engsel Pintu Buah A. 4.6.2.5

141 Memasang Engsel Jendela Kupu - Kupu Buah A. 4.6.2.6

142 Memasang Engsel Angin Buah A. 4.6.2.7

143 Memasang Kait Angin Buah A. 4.6.2.9

144 Memasang Slot Buah A. 4.6.2.11

145 Memasang Rel Pintu Sorong Buah A. 4.6.2.14

146 Memasang Kunci Lemari Buah A. 4.6.2.15

DIVISI 4.10 PEKERJAAN KACA


147 Memasang Kaca Polos Tebal 3 mm M²SNI-DT 91-0017-2007. 17a

148 Memasang Kaca Polos Tebal 5 mm M²SNI-DT 91-0017-2007. 17b

149 Memasang Kaca Riben Tebal 5 mm M²SNI-DT 91-0017-2007. 17b

150 Memasang Kaca Polos 3 mm M² A. 4.6.2.16

151 Memasang Kaca Polos 5 mm M² A. 4.6.2.17

152 Memasang Kaca Riben 5 mm M² A. 4.6.2.18

153 Memasang Kaca Cermin 5 mm M² A. 4.6.2.20


154 Memasang Kaca Patri 5 mm M² A. 4.6.2.24

DIVISI 5.1 PEKERJAAN PENGECATAN


155 Mengerok Permukaan Cat Lama M² A. 4.7.1.1

156 Mendempul dan Menggosok Kayu M² SNI-DT 91-0018-2007. 6

157 Pengecetan Bidang Kayu Lama M² SNI-DT 91-0018-2007. 7

158 Pengecetan Bidang Kayu Baru M² A. 4.7.1.4

159 Pelaburan Bidang Kayu Dengan Politur M² A. 4.7.1.7

160 Pelaburan Bidang Kayu Dengan Cat Residu dan Teer M² A. 4.7.1.8

161 Pengecetan Tembok Baru M² A. 4.7.1.10

162 Pengecetan Tembok Lama M² SNI-DT 91-0018-2007. 15

163 Pengecetan Permukaan Baja dengan Meni Besi M² A. 4.7.1.16

164 Pengecetan Permukaan Baja dengan Cat Besi M²SNI-DT 91-0018-2007. 20b

DIVISI 5.2 PEKERJAAN SANITASI


165 Memasang Kloset Duduk / Monoblok Bh A. 5.1.1.1

166 Memasang Kloset Jongkok Porselin Bh A. 5.1.1.2

167 Memasang Kloset Jongkok Teraso Bh A. 5.1.1.3

168 Memasang Bak Mandi Teraso Volume 0,3 m³ Bh SNI-DT 91-0016-2007. 6

169 Memasang Bak Mandi Batu Bata Volume 0,3 m³ Bh SNI-DT 91-0016-2007. 8

170 Memasang Pipa PVC Diameter 3/4 " M' RSNI-T15-2002. 2

171 Memasang Kran Diameter 3/4 " Bh RSNI-T15-2002. 2

DIVISI 6 PEKERJAAN PAVING BLOK & BRONJONG


172 Pasangan Batu Kali 1pc : 5 Ps M³ G. 31hd

173 Pasangan Paving Blok ( Type bata ) M² SP.Xa

174 Pasangan Paving Blok ( Type Tiga berlian ) M² SP.Xb

175 Pemasangan Bronjong Kawat Ukuran 3 mm M³ K. 815 a

176 Pemasangan Bronjong Kawat Ukuran 4 mm M³ K. 815 b

DIVISI 7 PEKERJAAN PIPA


177 Memasang Kran Diameter 3/4" M' A. 5.1.1.19

178 Memasang Pipa Galvanis 3/4" M' A. 5.1.1.20

179 Memasang Pipa Galvanis 1" M' A. 5.1.1.21

180 Memasang Pipa Galvanis 3" M' A. 5.1.1.23

181 Memasang Pipa Galvanis 4" M' A. 5.1.1.24

182 Memasang Pipa PVC Diameter 1/2" Type AW M' A. 5.1.1.25

183 Memasang Pipa PVC Diameter 3/4" Type AW M' A. 5.1.1.25

184 Memasang Pipa PVC Diameter 1" Type AW M' A. 5.1.1.26

185 Memasang Pipa PVC Diameter 2" Type AW M' A. 5.1.1.29


186 Memasang Pipa PVC Diameter 3" Type AW M' A. 5.1.1.31

187 Memasang Pipa PVC Diameter 4" Type AW M' A. 5.1.1.32

188 Memasang Pipa PVC Diameter 2" M' A. 8.4.1.1

189 Memasang Pipa PVC Diameter 3" M' A. 8.4.1.2

190 Memasang Pipa PVC Diameter 4" M' A. 8.4.1.3

191 Memasang Pipa PVC Diameter 6" M' A. 8.4.1.4

192 Memasang Pipa HDPE Diameter 2" M' A. 8.4.1.17

193 Memasang Pipa HDPE Diameter 4" M' A. 8.4.1.18

194 Memasang Pipa GIP Diameter 1" M' A. 8.4.1.34

195 Memasang Pipa GIP Diameter 3" M' A. 8.4.1.35

196 Memasang Pipa GIP Diameter 4" M' A. 8.4.1.36


AH KABUPATEN BIMA
AN PEMUDA DAN OLAHRAGA
EGERI 10 BIMA
lo - Bima Email smkn10_bima@yahoo.co.id

RGA SATUAN PEKERJAAN


nggaran 2016
HARGA DASAR( OVER HEAD HARGA TOTAL
KET
Rp ) (10%) (RP)
5 6 7 8

144,500.00 14,450.00 158,950.00

9,500.00 950.00 10,450.00

120,530.00 12,053.00 132,583.00

483,340.00 48,334.00 531,674.00

468,340.00 46,834.00 515,174.00

203,610.00 20,361.00 223,971.00

53,750.00 5,375.00 59,125.00

65,250.00 6,525.00 71,775.00

71,600.00 7,160.00 78,760.00

108,000.00 10,800.00 118,800.00

108,000.00 10,800.00 118,800.00

108,000.00 10,800.00 118,800.00

108,000.00 10,800.00 118,800.00

17,916.67 1,791.67 19,708.33

21,750.00 2,175.00 23,925.00

23,843.33 2,384.33 26,227.67

36,000.00 3,600.00 39,600.00

37,500.00 3,750.00 41,250.00

177,500.00 17,750.00 195,250.00

150,750.00 15,075.00 165,825.00

96,750.00 9,675.00 106,425.00

114,750.00 11,475.00 126,225.00

86,250.00 8,625.00 94,875.00


737,280.00 73,728.00 811,008.00

682,295.00 68,229.50 750,524.50

644,195.00 64,419.50 708,614.50

617,400.00 61,740.00 679,140.00

316,095.00 31,609.50 347,704.50

802,350.00 80,235.00 882,585.00

776,543.61 77,654.36 854,197.97

819,255.00 81,925.50 901,180.50

714,684.50 71,468.45 786,152.95

892,518.00 89,251.80 981,769.80

958,735.00 95,873.50 1,054,608.50

976,971.00 97,697.10 1,074,668.10

### 100,806.65 1,108,873.15

14,860.50 1,486.05 16,346.55

200,290.00 20,029.00 220,319.00

215,290.00 21,529.00 236,819.00

416,995.00 41,699.50 458,694.50

430,495.00 43,049.50 473,544.50

576,995.00 57,699.50 634,694.50

449,495.00 44,949.50 494,444.50

384,645.00 38,464.50 423,109.50

128,775.00 12,877.50 141,652.50

84,805.00 8,480.50 93,285.50

103,120.00 10,312.00 113,432.00

136,210.00 13,621.00 149,831.00

136,900.00 13,690.00 150,590.00

38,165.00 3,816.50 41,981.50

### 299,382.50 3,293,207.50

2,774.00 277.40 3,051.40

800,100.00 80,010.00 880,110.00

### 108,536.00 1,193,896.00

76,939.50 7,693.95 84,633.45

165,850.00 16,585.00 182,435.00

546,210.00 54,621.00 600,831.00


258,390.00 25,839.00 284,229.00

243,738.00 24,373.80 268,111.80

228,778.00 22,877.80 251,655.80

124,593.00 12,459.30 137,052.30

117,799.00 11,779.90 129,578.90

111,363.00 11,136.30 122,499.30

420,100.00 42,010.00 462,110.00

416,365.00 41,636.50 458,001.50

58,619.96 5,862.00 64,481.96

55,285.04 5,528.50 60,813.54

51,753.00 5,175.30 56,928.30

78,308.28 7,830.83 86,139.11

63,584.00 6,358.40 69,942.40

69,101.00 6,910.10 76,011.10

69,101.00 6,910.10 76,011.10

69,101.00 6,910.10 76,011.10

41,422.80 4,142.28 45,565.08

51,478.60 5,147.86 56,626.46

31,655.00 3,165.50 34,820.50

127,091.00 12,709.10 139,800.10

130,591.00 13,059.10 143,650.10

130,520.00 13,052.00 143,572.00

231,950.00 23,195.00 255,145.00

203,450.00 20,345.00 223,795.00

251,732.00 25,173.20 276,905.20

238,732.00 23,873.20 262,605.20

239,987.00 23,998.70 263,985.70

226,987.00 22,698.70 249,685.70

236,987.00 23,698.70 260,685.70

807,936.00 80,793.60 888,729.60

314,020.00 31,402.00 345,422.00

39,530.00 3,953.00 43,483.00


118,755.00 11,875.50 130,630.50

260,410.00 26,041.00 286,451.00

260,410.00 26,041.00 286,451.00

260,410.00 26,041.00 286,451.00

25,685.00 2,568.50 28,253.50

272,825.00 27,282.50 300,107.50

62,570.00 6,257.00 68,827.00

84,786.40 8,478.64 93,265.04

44,574.00 4,457.40 49,031.40

118,159.00 11,815.90 129,974.90

73,775.00 7,377.50 81,152.50

127,885.00 12,788.50 140,673.50

169,825.00 16,982.50 186,807.50

97,592.50 9,759.25 107,351.75

202,389.20 20,238.92 222,628.12

78,222.64 7,822.26 86,044.90

56,410.00 5,641.00 62,051.00

56,410.00 5,641.00 62,051.00

63,820.00 6,382.00 70,202.00

104,360.00 10,436.00 114,796.00

### ### ###

### 807,825.00 8,886,075.00

732,000.00 73,200.00 805,200.00

652,000.00 65,200.00 717,200.00

526,600.00 52,660.00 579,260.00

478,600.00 47,860.00 526,460.00

729,800.00 72,980.00 802,780.00

609,800.00 60,980.00 670,780.00

634,230.00 63,423.00 697,653.00

584,230.00 58,423.00 642,653.00

726,105.00 72,610.50 798,715.50

### 949,560.00 ###

### 729,560.00 8,025,160.00

### ### ###


### 892,550.00 9,818,050.00

### 874,180.00 9,615,980.00

### 654,180.00 7,195,980.00

87,650.00 8,765.00 96,415.00

76,550.00 7,655.00 84,205.00

101,730.00 10,173.00 111,903.00

124,200.00 12,420.00 136,620.00

129,550.00 12,955.00 142,505.00

### 256,363.50 2,819,998.50

87,650.00 8,765.00 96,415.00

109,250.00 10,925.00 120,175.00

87,600.00 8,760.00 96,360.00

65,600.00 6,560.00 72,160.00

194,725.00 19,472.50 214,197.50

256,245.00 25,624.50 281,869.50

241,613.00 24,161.30 265,774.30

479,130.00 47,913.00 527,043.00

191,700.00 19,170.00 210,870.00

191,250.00 19,125.00 210,375.00

221,250.00 22,125.00 243,375.00

2,831.50 283.15 3,114.65

24,875.00 2,487.50 27,362.50

40,325.00 4,032.50 44,357.50

39,325.00 3,932.50 43,257.50

185,750.00 18,575.00 204,325.00

143,250.00 14,325.00 157,575.00

142,190.00 14,219.00 156,409.00

105,115.00 10,511.50 115,626.50

140,315.00 14,031.50 154,346.50

151,690.00 15,169.00 166,859.00

143,615.00 14,361.50 157,976.50

142,063.00 14,206.30 156,269.30

150,863.00 15,086.30 165,949.30

142,063.00 14,206.30 156,269.30


351,063.00 35,106.30 386,169.30

10,875.00 1,087.50 11,962.50

10,145.00 1,014.50 11,159.50

33,395.00 3,339.50 36,734.50

35,185.00 3,518.50 38,703.50

42,869.00 4,286.90 47,155.90

13,425.00 1,342.50 14,767.50

26,783.00 2,678.30 29,461.30

19,557.00 1,955.70 21,512.70

29,760.00 2,976.00 32,736.00

32,760.00 3,276.00 36,036.00

### 386,011.50 4,246,126.50

470,940.00 47,094.00 518,034.00

401,290.00 40,129.00 441,419.00

568,740.00 56,874.00 625,614.00

### 142,469.60 1,567,165.60

177,900.00 17,790.00 195,690.00

51,775.00 5,177.50 56,952.50

811,458.80 81,145.88 892,604.68

154,739.00 15,473.90 170,212.90

172,139.00 17,213.90 189,352.90

707,280.00 70,728.00 778,008.00

755,280.00 75,528.00 830,808.00

50,900.00 5,090.00 55,990.00

16,127.50 1,612.75 17,740.25

16,897.50 1,689.75 18,587.25

41,360.00 4,136.00 45,496.00

43,445.00 4,344.50 47,789.50

10,652.00 1,065.20 11,717.20

10,722.00 1,072.20 11,794.20

11,132.00 1,113.20 12,245.20

16,600.00 1,660.00 18,260.00


24,022.50 2,402.25 26,424.75

49,572.50 4,957.25 54,529.75

12,330.00 1,233.00 13,563.00

13,950.00 1,395.00 15,345.00

41,030.00 4,103.00 45,133.00

- - -

4,470.00 447.00 4,917.00

5,200.00 520.00 5,720.00

15,862.50 1,586.25 17,448.75

38,715.00 3,871.50 42,586.50

40,800.00 4,080.00 44,880.00


DAFTAR HARGA BAHAN

NO JENIS BAHAN SATUAN HARGA SATUAN

1 Playwood 4 MM Lbr
2 Panel Beton Pracetak etr
3 Kolom Beton Pracetak Btg
4 Strorox Kg 255,000
5 Waterstop m 80,000
6 Minyak Begisting etr 42,000
7 Penjaga Jarak Bekistig/Spacer Bh 45,000
8 Besi Hollow 30-50,3 Kg
9 Phenol Flm 12mm Ltr
10 Dinabolt dia 12mm (10-15cm) Bh 3,000
11 Besi Profil Kg 18,400
12 Besi Baja IWF Kg 19,000
13 Besi siku L 30-30,3 Kg 40,700
14 Besi Plat Baja Kg 45,000
15 Kawat Las Listrik Kg 33,000
16 Besi Stip Baja Kg 18,040
17 Besi Scuare Tube m 6,000
18 Besi Lis kaca(1x1)cm m 260,000
19 Penjelasan cm
20 Pintu Gulung Besi(Rolling Door) m2 570,000
21 Pintu Lipat (Folding door) m2 1,000,000
22 Suns Creen allumunium m2 352,000
23 Rolling door alumunium m2 520,000
24 Profil alumunium m 60,000
25 Skrup Fixer kotak 25,000
26 Sealant Tube 35,000
27 Alumunium Strip m 30,000
28 Pintu alumunium Buah 850,000
29 Venetions blinnds m2 120,000
30 Vertical Blinds ( tirai ) m2 120,000
31 Baja Strip (0,2x2 ) cm Kg 18,040
32 Rangka metal hollow 40 40.2mm m
33 Kapur Padam m3
34 HB - 20 m3 800
35 HB - 15 m3 800
36 HB - 10 m3 800
37 Bata Roster m3
38 Bata Berongga m3
39 Batu Granit bh 11,440
40 Ubin Teralux Marmer bh
41 Plint Ubin Pc bh
42 Plint Ubin Granit bh
43 Plint Ubin Traso bh
44 Plint Ubin Teralux kerang bh 206,000
45 Plint ubin Teralux marmer bh 269,600
46 Interval Cove bh
47 Karpet bh 94,380
48 Underlayer m2 101,640
49 Parguet m2 130,680
50 Porslen bh 1,200
51 Batu paras bh 65,400
52 Batu temple hitam bh 2,500
53 Vynil bh 108,900
54 Wallpaper m
55 Floor Haiderner kg
56 Akuistik lbr
57 Gypsum Board lbr 68,400
58 Profil allum T m
59 Ramset bh
60 Rooflight 90 x 180 ltr
61 Plastic aeratur bh
BAHAN

KET

81.40
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
1 M2 Pasang Rangka Atap Baja Ringan

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH


ORANG OH (Rp/Org/Hari)

4 Pekerja 0.200 70,000.00


11 Tukang Besi Beton 0.450 110,000.00
12 Kepala Tukang Besi Beton 0.010 115,000.00
5 Mandor 0.050 50,000.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN

645 C.75, 100 - M 12,500.00


646 C.75, 75 1.3200 M 11,000.00
647 Reng 6.080 M 6,000.00
648 Baut (screw drive) 26.0000 Bh 1,050.00
649 Dynabolt 0.6000 Bh 4,000.00
650 Plat Blancing 0.600 M 30,000.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 165,850.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


Pasang Daun Pintu dan Jendela Kaca Rangka Aluminium

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH


ORANG OH (Rp/Org/Hari)

4 Pekerja 0.085 70,000.00


11 Tukang Besi Beton 0.085 110,000.00
12 Kepala Tukang Besi Beton 0.009 115,000.00
5 Mandor 0.005 50,000.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN

606 Profil alumunium 4.4000 M 60,000.00


609 Alumunium Strip 4.5000 M 30,000.00
608 Sealant 0.275 M 35,000.00
### Kaca Polos 5 mm 1.1000 M2 110,000.00

SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 546,210.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


1 Pasang Langit-langit Gypsum Rangka Hallow

PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :


NTB 52 BIMA 06 SMKN 10 BIMA

PEKERJA JUMLAH HARI KODE JUMLAH UPAH


ORANG OH (Rp/Org/Hari)

4 Pekerja 0.150 70,000.00


6 Tukang Batu 0.250 110,000.00
10 Kepala Tukang Kayu 0.025 115,000.00
5 Mandor 0.075 50,000.00

SUB JUMLAH ( Rp )
MATERIAL JUMLAH SAT KODE HARGA
VOLUME SATUAN

614 Rangka metal hollow 40 40 5.0000 M' 22,500.00


648 Baut (screw drive) 26.0000 Bh 1,050.00
649 Dynabolt 5.0000 Bh 4,000.00
639 Gypsum Board 1.0000 Lbr 68,400.00
SUB JUMLAH ( Rp )
PERALATAN JUMLAH HARI KODE JAM HARGA
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )
VOLUME
QUANTITY : 1.00 M2 HARGA SATUAN ( Rp ) 272,825.00

SMKN 10 BIMA ANALISA BIAYA PEKERJAAN


1 Memasang Langit - Langit Tripleks ( 120 x 240 ) cm,
Tebal 3 mm+ rangka Kayu
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :
NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.1500 70,000.00


9 Tukang Kayu 0.2500 110,000.00
10 Kepala Tukang Kayu 0.0250 115,000.00
5 Mandor 0.0750 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

### Tripleks 120 x 240 x 3 mm 0.3750 Lembar 52,000.00


### Paku Panjang 1 - 3 cm 0.0300 Kg 21,000.00
85 Balok Kayu Kls II 0.0120 M3 4,500,000.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 118,755.00
SMKN 10 BIMA ANALISA BIAYA PEKERJAAN
1
Paving Block Type Berlian
PROPINSI : KODE : KABUPATEN : KODE : DISIAPKAN OLEH :
NTB 52 BIMA 06 SMKN 10 BIMA

JUMLAH HARI KODE JUMLAH UPAH


PEKERJA
ORANG OH (Rp/Org/Hari)

4 Pekerja 0.0200 70,000.00


6 Tukang Batu 0.0630 110,000.00
7 Kepala Tukang Batu 0.0063 115,000.00
5 Mandor 0.0025 50,000.00

SUB JUMLAH ( Rp )
JUMLAH SAT KODE HARGA
MATERIAL
VOLUME SATUAN

22 Pasir Pasang 0.1000 m3 145,000.00


### Paving Blok Biasa Type Berli ### Biji 2,700.00

SUB JUMLAH ( Rp )
JUMLAH HARI KODE JAM HARGA
PERALATAN
ALAT KERJA KERJA ( Rp/ Jam )

SUB JUMLAH ( Rp )

VOLUME
QUANTITY : 1.00 M² HARGA SATUAN ( Rp ) 120,879.50
PEKERJAAN KODE
tap Baja Ringan SNI-DT 91-0014-2007.6

DISIAPKAN OLEH : TANGGAL


SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

14,000.00
49,500.00
1,150.00
2,500.00

MLAH ( Rp ) 67,150.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

-
14,520.00
36,480.00
27,300.00
2,400.00
18,000.00
MLAH ( Rp ) 98,700.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

MLAH ( Rp ) -
TOTAL (Rp) 165,850.00

Per M²

PEKERJAAN KODE
a Kaca Rangka Aluminium SNI-7393:2008-6.13

DISIAPKAN OLEH : TANGGAL


SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

5,950.00
9,350.00
1,035.00
250.00

MLAH ( Rp ) 16,585.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

264,000.00
135,000.00
9,625.00
121,000.00

MLAH ( Rp ) 529,625.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

MLAH ( Rp ) -
TOTAL (Rp) 546,210.00

Per M²

PEKERJAAN KODE
sum Rangka Hallow SNI-DT 91-0013-2007.10

DISIAPKAN OLEH : TANGGAL


SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

10,500.00
27,500.00
2,875.00
3,750.00

MLAH ( Rp ) 44,625.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

112,500.00
27,300.00
20,000.00
68,400.00
MLAH ( Rp ) 228,200.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

MLAH ( Rp ) -
TOTAL (Rp) 272,825.00
Per M2

PEKERJAAN KODE
ipleks ( 120 x 240 ) cm,
A. 4.5.2.5.a
angka Kayu
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

10,500.00
27,500.00
2,875.00
3,750.00

UMLAH ( Rp ) 44,625.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

19,500.00
630.00
54,000.00

UMLAH ( Rp ) 74,130.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 118,755.00

Per M²
PEKERJAAN KODE
ype Berlian A. 4.5.2.5.a
DISIAPKAN OLEH : TANGGAL
SMKN 10 BIMA Maret 2015

BIAYA SUB TOTAL


( Rp ) ( Rp )

1,400.00
6,930.00
724.50
125.00

UMLAH ( Rp ) 9,179.50
BIAYA SUB TOTAL
( Rp ) ( Rp )

14,500.00
97,200.00

UMLAH ( Rp ) 111,700.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

UMLAH ( Rp ) -
TOTAL (Rp) 120,879.50

Per M²
RENCANA ANGGARAN BIAYA
KEGIATAN : Pembangunan Dan Rehabilitasi Ruang Kelas
PEKERJAAN : Rehabilitasi Ruang Kelas SDN DONGGOBOLO
LOKASI : Kecamatan WOHA
SUMBER DANA : APBN
TAHUN ANGGARAN : 2016

NO URAIAN PEKERJAAN Koefisien VOL. SAT.

1 2 3 4

I. PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan 1.00
2 Pengukuran dan Pemasangan Bowplank 1.00

II. PEKERJAAN TANAH DAN PASIR


1 Galian Tanah Biasa M3
Pekerja
Pekerja 0.75 - Orng
Mandor 0.025 - Orng

2 Urugan Kembali M3
Pekerja
Pekerja 0.25 - Orng
Mandor 0.0083333333 - Orng

3 Urugan Tanah M3
Pekerja
Pekerja 0.25 - Orng
Mandor 0.025 - Orng
Bahan
Tanah Urug 1.2 - M3

4 Urugan Sirtu M3
Pekerja
Pekerja 0.25 - Orng
Mandor 0.025 - Orng
Bahan
Sirtu 1.2 - M3

III. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan Pondasi Batu Kali 1Pc : 5Ps 0.19 M3
Pekerja
Pekerja 1.5 0.28 Orng
Tukang Batu 0.75 0.14 Orng
K. Tukang Batu 0.075 0.01 Orng
Mandor 0.075 0.01 Orng
Bahan
Batu Belah 1.2 0.23 M3
Semen ` 2.72 0.51 Zak
Pasir Pasang 0.544 0.10 M3
2 Pasangan Pondasi Batu Kosong 0.12 M3
Pekerja
Pekerja 0.78 0.09 Orng
Tukang Batu 0.39 0.05 Orng
K. Tukang Batu 0.039 0.00 Orng
Mandor 0.039 0.00 Orng
Bahan
Batu Kali 1.2 0.14 M3
Pasir Urug 0.432 0.05 M3
3 Pasangan Bata Merah tebal 1/2 Bata, 1Pc : 5Ps 122.05 M2
Pekerja
Pekerja 0.3 36.62 Orng
Tukang Batu 0.1 12.21 Orng
K. Tukang Batu 0.01 1.22 Orng
Mandor 0.015 1.83 Orng
Bahan
Batu Bata Kls I 70 8,543.50 Buah
PC. Merk Tiga Roda (50 Kg) 0.194 23.68 Zak
Pasir Pasang 0.045 5.49 M3

4 Plesteran 1Pc : 5Ps, tebal 15 mm 354.27 M2


Pekerja
Pekerja 0.3 106.28 Orng
Tukang Batu 0.15 53.14 Orng
K. Tukang Batu 0.015 5.31 Orng
Mandor 0.015 5.31 Orng
Bahan
PC. Merk Tiga Roda (50 Kg) 0.104 36.84 Zak
Pasir Pasang 0.026 9.21 M3

IV. PEKERJAAN BETON


1 Beton K175 0.22 M3
Pekerja
Pekerja 1.2 0.26 Orng
Tukang Batu 0.2 0.04 Orng
K. Tukang Batu 0.02 0.00 Orng
Mandor 0.06 0.01 Orng
Bahan
PC. Merk Tiga Roda (50 Kg) 4.6 1.01 Zak
Pasir Beton 0.4827 0.11 M3
Kerikil Pecah 2 - 3 cm (MSC) 0.6224 0.14 M3
Air 200 43.75 Ltr

1 Pekerjaan Sloof Uk. 15/20


- Pasang Bekisting untuk Sloof ( Asumsi 3 Kali Pemakaian) M2
Pekerja
Pekerja 0.52 0 Orng
Tukang Kayu 0.26 0 Orng
K. Tukang Kayu 0.026 0 Orng
Mandor 0.026 0 Orng
Bahan
Papan Kayu Kls III 0.045 0 M3
Paku Panjang 7 - 12 cm 0.3 0 Kg
Teak Oil 0.1 0 Ltr

- Pembesian 132.00 Kg
Pekerja
Pekerja 0.007 0.92 Orng
Tukang Besi Beton 0.007 0.92 Orng
Kepala Tukang Besi Beton 0.0007 0.09 Orng
Mandor 0.0004 0.05 Orng
Bahan
Besi Beton Polos 1.05 138.60 Kg
Kawat Ikat Beton 0.015 1.98 Kg

- Beton K175 M3
Pekerja
Pekerja 1.65 0.00 Orng
Tukang Batu 0.275 0.00 Orng
K. Tukang Batu 0.028 0.00 Orng
Mandor 0.083 0.00 Orng
Bahan
PC. Merk Tiga Roda (50 Kg) 6.52 0.00 Zak
Pasir Beton 0.4108 0.00 M3
Kerikil Pecah 2 - 3 cm (MSC) 0.6236 0.00 M3
Air 215 0.00 Ltr
2 Pekerjaan Ring Balok Uk. 11/15 0.48 M1
Pekerja
Pekerja 0.297 0.14 Orng
Tukang Batu 0.033 0.02 Orng
Tukang Kayu 0.033 0.02 Orng
Tukang Besi Beton 0.033 0.02 Orng
Kepala Tukang Batu 0.01 0.00 Orng
Mandor 0.015 0.01 Orng
Bahan
Papan Kayu Kls III 0.003 0.00 M3
Paku Panjang 4 - 6 cm 0.02 0.01 Kg
Besi Beton Polos 3.6 1.73 Kg
Kawat Ikat Beton 0.05 0.02 Kg
PC. Merk Tiga Roda (50 Kg) 0.11 0.05 Zak
Pasir Beton 0.009 0.00 M3
Kerikil Pecah 2 - 3 cm (MSC) 0.015 0.01 M3

3 Pekerjaan Kolom Teras Uk. 20/20


- Pasang Bekisting untuk Kolom ( Asumsi 3 Kali Pemakaian) M2
Pekerja
Pekerja 0.52 0 Orng
Tukang Kayu 0.26 0 Orng
K. Tukang Kayu 0.026 0 Orng
Mandor 0.026 0 Orng
Bahan
Papan Kayu Kls III 0.045 0 M3
Paku Panjang 7 - 12 cm 0.3 0 Kg
Teak Oil 0.1 0 Ltr

- Pembesian Kg
Pekerja
Pekerja 0.007 0.00 Orng
Tukang Besi Beton 0.007 0.00 Orng
Kepala Tukang Besi Beton 0.0007 0.00 Orng
Mandor 0.0004 0.00 Orng
Bahan
Besi Beton Polos 1.05 0.00 Kg
Kawat Ikat Beton 0.015 0.00 Kg

- Beton K175 0.11 M3


Pekerja
Pekerja 1.65 0.18 Orng
Tukang Batu 0.275 0.03 Orng
K. Tukang Batu 0.028 0.00 Orng
Mandor 0.083 0.01 Orng
Bahan
PC. Merk Tiga Roda (50 Kg) 6.52 0.72 Zak
Pasir Beton 0.4108 0.05 M3
Kerikil Pecah 2 - 3 cm (MSC) 0.6236 0.07 M3
Air 215 23.65 Ltr

4 Pekerjaan Kolom Uk. 25/25


- Pasang Bekisting untuk Kolom ( Asumsi 3 Kali Pemakaian 0.09 M2
Pekerja
Pekerja 0.52 0.05 Orng
Tukang Kayu 0.26 0.02 Orng
K. Tukang Kayu 0.026 0.00 Orng
Mandor 0.026 0.00 Orng
Bahan
Papan Kayu Kls III 0.045 0.00 M3
Paku Panjang 7 - 12 cm 0.3 0.03 Kg
Teak Oil 0.1 0.01 Ltr
- Pembesian 156.27 Kg
Pekerja
Pekerja 0.007 1.09 Orng
Tukang Besi Beton 0.007 1.09 Orng
Kepala Tukang Besi Beton 0.0007 0.11 Orng
Mandor 0.0004 0.06 Orng
Bahan
Besi Beton Polos 1.05 164.08 Kg
Kawat Ikat Beton 0.015 2.34 Kg

- Beton K175 M3
Pekerja
Pekerja 1.65 0.00 Orng
Tukang Batu 0.275 0.00 Orng
K. Tukang Batu 0.028 0.00 Orng
Mandor 0.083 0.00 Orng
Bahan
PC. Merk Tiga Roda (50 Kg) 6.52 0.00 Zak
Pasir Beton 0.4108 0.00 M3
Kerikil Pecah 2 - 3 cm (MSC) 0.6236 0.00 M3
Air 215 0.00 Ltr

5 Pekerjaan Beton Gewel M1


Pekerja
Pekerja 0.18 0.00 Orng
Tukang Batu 0.02 0.00 Orng
Tukang Kayu 0.02 0.00 Orng
Tukang Besi Beton 0.02 0.00 Orng
Kepala Tukang Batu 0.006 0.00 Orng
Mandor 0.009 0.00 Orng
Bahan
Papan Kayu Kls III 0.002 0.00 M3
Paku Panjang 4 - 6 cm 0.01 0.00 Kg
Besi Beton Polos 3.000 0.00 Kg
Kawat Ikat Beton 0.45 0.00 Kg
PC. Merk Tiga Roda (50 Kg) 0.08 0.00 Zak
Pasir Beton 0.006 0.00 M3
Kerikil Pecah 2 - 3 cm (MSC) 0.009 0.00 M3

V. PEKERJAAN KUSEN
1 Kusen Pintu dan Jendelah Kayu Klas I 0.88 M3
Pekerja
Pekerja 7 6.16 Orng
Tukang Kayu 21 18.47 Orng
Kepala Tukang Kayu 2.1 1.85 Orng
Mandor 0.35 0.31 Orng
Bahan
Balok Kayu Kls I 1.1 0.97 M3
Paku Panjang 7 - 12 cm 1.25 1.10 Kg
Lem Kayu 1 0.88 Kg

2 Memasang Daun Pintu Panil 6.40 M2


Pekerja
Pekerja 1 6.40 Orng
Tukang Kayu 3 19.20 Orng
Kepala Tukang Kayu 0.3 1.92 Orng
Mandor 0.05 0.32 Orng
Bahan
Papan Kayu Kls I 0.04 0.26 M3
Lem Kayu 0.5 3.20 Kg
3 Memasang Daun Jendelah Kaca 5 mm 9.98 M2
Pekerja
Pekerja 0.8 7.99 Orng
Tukang Kayu 2.4 23.96 Orng
Kepala Tukang Kayu 0.24 2.40 Orng
Mandor 0.04 0.40 Orng
Bahan
Papan Kayu Kls I 0.024 0.24 M3
Lem Kayu 0.3 3.00 Kg

4 Kaca Polos 5 MM 7.70 M2


Pekerja
Pekerja 0.015 0.12 Orng
Tukang Kayu 0.15 1.15 Orng
Kepala Tukang Kayu 0.015 0.12 Orng
Mandor 0.0008 0.01 Orng
Bahan
Kaca Polos 5 mm 1.1 8.47 M2

5 Pemasangan Krepeye 1.49 M2


Pekerja
Pekerja 0.67 1.00 Orng
Tukang Kayu 2 2.97 Orng
Kepala Tukang Kayu 0.2 0.30 Orng
Mandor 0.335 0.50 Orng
Bahan
Papan Kayu Kls II 0.06 0.09 M3
Paku Panjang 1 - 3 cm 0.15 0.22 Kg

VI. PEKERJAAN PLAFOND


1 Memasang Langit - Langit Tripleks ( 120 x 240 ) cm, Teb 261.00 M2
Pekerja
Pekerja 0.15 39.15 Orng
Tukang Kayu 0.3 78.30 Orng
Kepala Tukang Kayu 0.03 7.83 Orng
Mandor 0.075 19.58 Orng
Bahan
Balok Kayu Kls II 0.0154 4.02 M3
Paku Panjang 4 - 6 cm 0.2 52.20 Kg

2 Memasang Tripleks 3 mm 261.00 M2


Pekerja
Pekerja 0.1 26.10 Orng
Tukang Kayu 0.1 26.10 Orng
Kepala Tukang Kayu 0.01 2.61 Orng
Mandor 0.005 1.31 Orng
Bahan
Tripleks 120 x 240 x 3 mm 0.375 97.88 Lbr
Paku Panjang 1 - 3 cm 0.03 7.83 Kg
3 List Plafond 130.00 M1
Pekerja
Pekerja 0.05 6.50 Orng
Tukang Kayu 0.05 6.50 Orng
Kepala Tukang Kayu 0.005 0.65 Orng
Mandor 0.003 0.39 Orng
Bahan
List Profil Kayu 1.05 136.50 M'
Paku Panjang 1 - 3 cm 0.01 1.30 Kg
VII. PEKERJAAN LANTAI
1 Pasang Lantai Keramik 30 x 30 Cm 104.40 M2
Pekerja
Pekerja 0.7 73.08 Orng
Tukang Batu 0.35 36.54 Orng
Kepala Tukang Batu 0.035 3.65 Orng
Mandor 0.035 3.65 Orng
Bahan
Tegel Keramik Kualitas II 1 104.40 M2
PC. Merk Tiga Roda (50 Kg) 0.2 20.88 Zak
Pasir Pasang 0.045 4.70 M3
Semen Warna 1.5 156.60 Kg

VIII. PEKERJAAN ATAP


1 Pasang Rangka Atap Kayu 238.99 M2

Pekerja 0.10 23.90 Orng


Tukang Kayu 0.10 23.90 Orng
Kepala Tukang Kayu 0.01 2.39 Orng
Mandor 0.01 1.19 Orng
Bahan
Balok Kayu Kls II 0.014 3.35 M
Paku Panjang 4 - 6 cm 0.25 59.75 M

2 Memasang Konstruksi Kuda-Kuda kls 1 1.63


Pekerja 4.00 19.59 Orng
Tukang Kayu 12.00 23.50 Orng
Kepala Tukang Kayu 1.20 4.70 Orng
Mandor 0.20 0.33 Orng

Bahan
Balok Kayu Kls I 1.100 1.80 M3
Besi Beugel/Baut (Kuda-kuda) 15.000 293.80 Kg
Paku Panjang 7 - 12 cm 5.600 10.05 Kg

Memasang Gording Kelas I 1.63


Pekerja 2.400 3.92 Orng
Tukang Kayu 7.200 28.20 Orng
Kepala Tukang Kayu 0.720 20.31 Orng
Mandor 0.120 2.44 Orng
Bahan
Balok Kayu Kls II 1.100 1.80 M3
Besi Beugel/Baut (Kuda-kuda) 15.000 58.76 Kg
Paku Panjang 7 - 12 cm 3.000 84.61 Kg

3 Atap Metal Roof 356.70 M2


Pekerja
Pekerja 0.2 71.34 Orng
Tukang Kayu 0.1 35.67 Orng
Kepala Tukang Kayu 0.01 3.57 Orng
Mandor 0.01 3.57 Orng
Bahan
Genteng Metal Roof 1.5625 557.34 Lbr
Paku Panjang 4 - 6 cm 0.03 10.70 Kg

4 Bubungan Atap Metal Roof 30.50 M1


Pekerja
Pekerja 0.084 2.56 Orng
Tukang Kayu 0.125 3.81 Orng
Kepala Tukang Kayu 0.013 0.40 Orng
Mandor 0.004 0.12 Orng
Bahan
Bubungan Genteng Metal Roof 1.02 31.11 Buah
Paku Panjang 4 - 6 cm 0.2 6.10 Kg

5 Lisplang ( 3 x 20 ) cm, Kayu Klas II 41.80 M1


Pekerja
Pekerja 0.1 4.18 Orng
Tukang Kayu 0.2 8.36 Orng
Kepala Tukang Kayu 0.02 0.84 Orng
Mandor 0.005 0.21 Orng
Bahan
Papan Kayu Kls II 0.0108 0.45 M3
Paku Panjang 4 - 6 cm 0.1 4.18 Kg

IX. PEKERJAAN PENGUNCI


1 Kunci Pintu 2 Slag KW I 6.00 bh
2 Engsel Nylon 10.00 Psg
3 Engsel Kupu-kupu 16.00 Psg
4 Hag angin Besar 32.00 bh
5 Angkel Kusen 30.00 bh
X. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Baru 824.66 M2
Pekerja
Pekerja 0.02 16.49 Orng
Tukang Cat 0.063 51.95 Orng
Kepala Tukang Cat 0.0063 5.20 Orng
Mandor 0.0025 2.06 Orng
Bahan
Plamir Tembok 0.1 82.47 Kg
Cat Tmbk Mutu Menengah 0.1 82.47 Kg
Cat Tmbk Mutu Tinggi 0.26 214.41 Kg

2 1 M2 Pengecatan Bidang Kayu Baru 67.31 M2


Pekerja
Pekerja 0.07 4.71 Orng
Tukang Cat 0.009 0.61 Orng
Kepala Tukang Cat 0.006 0.40 Orng
Mandor 0.0025 0.17 Orng
Bahan
Meni Kayu 0.2 13.46 Kg
Plamir Kayu 0.15 10.10 Kg
Cat Kayu Mutu Menengah 0.17 11.44 Kg
Cat Kayu Mutu Tinggi 0.26 17.50 Kg

3 Pengecatan Plafond 261.00 M2

Pekerja

Pekerja 0.02 5.22 Orng

Tukang Cat 0.063 16.44 Orng

Kepala Tukang Cat 0.0063 1.64 Orng

Mandor 0.0025 0.65 Orng

Bahan

Plamir Tembok 0.1 26.10 Kg

Cat Tmbk Mutu Menengah 0.1 26.10 Kg

Cat Tmbk Mutu Tinggi 0.26 67.86 Kg

XI. PEKERJAAN LISTRIK


1 Titik Lampu 16.00 Bh
2 Lampu TL 20 Wat 16.00 Bh
3 Saklar Engkel 1.00 Bh
4 Stop Kontak Tanam 3.00 Bh

XIII. PEKERJAAN TAMBAHAN MEUBLEAR


1 Kursi Guru 3.00 Bh
2 Meja Guru 1/2 Biro 4.00 Bh
3 Meja Siswa 18.00 Bh
4 Kursi Siswa 18.00 Bh
5 Papan Tulis 4.00 Bh
GARAN BIAYA
litasi Ruang Kelas
SDN DONGGOBOLO

HARGA SATUAN JUMLAH HARGA (Rp.)


KODE ANALISA (Rp.)
5 6 7

Ls 150,000.00 150,000.00
Ls 300,000.00 300,000.00
450,000.00

A. 2.3.1.1 53,750.00 -

70,000.00 -
50,000.00 -
-

A. 2.3.1.9.1 17,916.67 -

70,000.00 -
50,000.00 -
-

SNI-DT 91-0006-2007. 15b 114,750.00 -

70,000.00 -
50,000.00 -

80,000.00 -
-

A. 3.2.1.15 150,750.00 -

70,000.00 -
50,000.00 -
-
130,000.00 -
-

A. 3.2.1.3 644,195.00 120,786.56

70,000.00 19,687.50
110,000.00 15,468.75
115,000.00 1,617.19
50,000.00 703.13

130,000.00 29,250.00
77,000.00 39,270.00
145,000.00 14,790.00
120,786.56
A. 3.2.1.9 316,095.00 37,931.40

70,000.00 6,552.00
110,000.00 5,148.00
115,000.00 538.20
50,000.00 234.00

130,000.00 18,720.00
130,000.00 6,739.20
37,931.40
A. 4.4.1.10 111,363.00 13,591,858.07

70,000.00 2,563,050.74
110,000.00 1,342,550.39
115,000.00 140,357.54
50,000.00 91,537.53
-
800.00 6,834,801.97
77,000.00 1,823,183.43
145,000.00 796,376.48
13,591,858.07

A. 4.4.2.5 51,753.00 18,334,792.37

70,000.00 7,439,774.31
110,000.00 5,845,536.96
115,000.00 611,124.32
50,000.00 265,706.23

77,000.00 2,837,033.94
145,000.00 1,335,616.63
18,334,792.37

A. 4.1.1.4 714,684.50 156,337.23

70,000.00 18,375.00
110,000.00 4,812.50
115,000.00 503.13
50,000.00 656.25
-
77,000.00 77,481.25
175,000.00 18,478.36
255,000.00 34,718.25
30.00 1,312.50
156,337.23

A. 4.1.1.21 215,290.00 -

70,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -

3,000,000.00 -
21,000.00 -
47,000.00 -
-

A. 4.1.1.17 14,860.50 1,961,586.00

70,000.00 64,680.00
110,000.00 101,640.00
115,000.00 10,626.00
50,000.00 2,640.00
12,500.00 1,732,500.00
25,000.00 49,500.00
1,961,586.00

A. 4.1.1.5 892,518.00 -

70,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -
-
77,000.00 -
175,000.00 -
255,000.00 -
30.00 -
-
A. 4.1.1.36 103,120.00 49,497.60

70,000.00 9,979.20
110,000.00 1,742.40
110,000.00 1,742.40
110,000.00 1,742.40
115,000.00 552.00
50,000.00 360.00

3,000,000.00 4,320.00
21,000.00 201.60
12,500.00 21,600.00
25,000.00 600.00
77,000.00 4,065.60
175,000.00 756.00
255,000.00 1,836.00
49,497.60

A. 4.1.1.21 215,290.00 -

70,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -

3,000,000.00 -
21,000.00 -
47,000.00 -
-

A. 4.1.1.17 14,860.50 -

70,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -

12,500.00 -
25,000.00 -
-

A. 4.1.1.5 892,518.00 98,176.98

70,000.00 12,705.00
110,000.00 3,327.50
115,000.00 354.20
50,000.00 456.50

77,000.00 55,224.40
175,000.00 7,907.90
255,000.00 17,491.98
30.00 709.50
98,176.98
A. 4.1.1.21 215,290.00 18,837.88

70,000.00 3,185.00
110,000.00 2,502.50
115,000.00 261.63
50,000.00 113.75

3,000,000.00 11,812.50
21,000.00 551.25
47,000.00 411.25
18,837.88
A. 4.1.1.17 14,860.50 2,322,179.00

70,000.00 76,569.95
110,000.00 120,324.20
115,000.00 12,579.35
50,000.00 3,125.30

12,500.00 2,050,980.75
25,000.00 58,599.45
2,322,179.00

A. 4.1.1.5 892,518.00 -

70,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -

77,000.00 -
175,000.00 -
255,000.00 -
30.00 -
-

A. 4.1.1.35 84,805.00 -

70,000.00 -
110,000.00 -
110,000.00 -
110,000.00 -
115,000.00 -
50,000.00 -

3,000,000.00 -
21,000.00 -
12,500.00 -
25,000.00 -
77,000.00 -
175,000.00 -
255,000.00 -
-

A. 4.6.1.1 10,265,250.00 9,026,456.05

70,000.00 430,867.58
110,000.00 2,031,232.90
115,000.00 212,356.17
50,000.00 15,388.13

6,500,000.00 6,287,149.44
21,000.00 23,082.19
30,000.00 26,379.65
9,026,456.05

A. 4.6.1.5.1 732,000.00 4,684,800.00


70,000.00 448,000.00
110,000.00 2,112,000.00
115,000.00 220,800.00
50,000.00 16,000.00

7,000,000.00 1,792,000.00
30,000.00 96,000.00
4,684,800.00
A. 4.6.1.6.1 526,600.00 5,257,574.40

70,000.00 559,104.00
110,000.00 2,635,776.00
115,000.00 275,558.40
50,000.00 19,968.00

7,000,000.00 1,677,312.00
30,000.00 89,856.00
5,257,574.40

SNI-DT 91-0017-2007. 17b 140,315.00 1,079,864.24

70,000.00 8,080.80
110,000.00 126,984.00
115,000.00 13,275.60
50,000.00 307.84

110,000.00 931,216.00
1,079,864.24

A. 4.6.1.10.2 609,800.00 906,650.64

70,000.00 69,730.92
110,000.00 327,096.00
115,000.00 34,196.40
50,000.00 24,903.90

5,000,000.00 446,040.00
21,000.00 4,683.42
906,650.64

A. 4.6.1.19 124,200.00 32,416,200.00

70,000.00 2,740,500.00
110,000.00 8,613,000.00
115,000.00 900,450.00
50,000.00 978,750.00

4,500,000.00 18,087,300.00
21,000.00 1,096,200.00
32,416,200.00

A. 4.5.2.5 39,530.00 10,317,330.00

70,000.00 1,827,000.00
110,000.00 2,871,000.00
115,000.00 300,150.00
50,000.00 65,250.00

52,000.00 5,089,500.00
21,000.00 164,430.00
10,317,330.00
A. 4.5.2.10 25,685.00 3,339,050.00

70,000.00 455,000.00
110,000.00 715,000.00
115,000.00 74,750.00
50,000.00 19,500.00

15,000.00 2,047,500.00
21,000.00 27,300.00
3,339,050.00
A. 4.4.3.35.2 203,450.00 21,240,180.00

70,000.00 5,115,600.00
110,000.00 4,019,400.00
115,000.00 420,210.00
50,000.00 182,700.00

66,500.00 6,942,600.00
77,000.00 1,607,760.00
145,000.00 681,210.00
14,500.00 2,270,700.00
21,240,180.00

SNI-DT 91-0014-2007.6 87,650.00 20,947,385.85

70,000.00 1,672,923.00
110,000.00 2,628,879.00
115,000.00 274,837.35
50,000.00 59,747.25

4,500,000.00 15,056,307.00
21,000.00 1,254,692.25
-
Jumlah 20,947,385.85

70,000.00 1,371,074.88
110,000.00 2,585,455.49
115,000.00 540,595.24
50,000.00 16,322.32

6,500,000.00 11,670,458.80
32,000.00 9,401,656.32
21,000.00 211,145.53
Jumlah 24,425,633.70

70,000.00 274,214.98
110,000.00 3,102,546.59
115,000.00 2,335,371.43
50,000.00 121,845.47

6,500,000.00 11,670,458.80
32,000.00 1,880,331.26
21,000.00 1,776,913.04

Jumlah 21,161,681.57
Total 66,534,701.11

A. 4.5.2.32 97,592.50 34,811,244.75

70,000.00 4,993,800.00
110,000.00 3,923,700.00
115,000.00 410,205.00
50,000.00 178,350.00

45,000.00 25,080,468.75
21,000.00 224,721.00
34,811,244.75

SNI-DT 91-0014-2007.23 61,225.00 1,867,362.50

70,000.00 179,340.00
110,000.00 419,375.00
115,000.00 45,597.50
50,000.00 6,100.00

35,000.00 1,088,850.00
21,000.00 128,100.00
1,867,362.50

A. 4.6.1.21.2 87,650.00 3,663,770.00

70,000.00 292,600.00
110,000.00 919,600.00
115,000.00 96,140.00
50,000.00 10,450.00

5,000,000.00 2,257,200.00
21,000.00 87,780.00
3,663,770.00
TOTAL

Ls 180,000.00 1,080,000.00
Ls 14,500.00 145,000.00
Ls 12,000.00 192,000.00
Ls 15,000.00 480,000.00
Ls 8,000.00 240,000.00
2,137,000.00
Total
A. 4.7.1.10 26,783.00 22,086,933.06

70,000.00 1,154,527.36
115,000.00 5,974,679.09
110,000.00 571,491.04
50,000.00 103,082.80
-
20,000.00 1,649,324.80
31,000.00 2,556,453.44
47,000.00 10,077,374.53
22,086,933.06

A. 4.7.1.4 35,185.00 2,368,260.13

70,000.00 329,813.12
115,000.00 69,664.61
110,000.00 44,423.81
50,000.00 8,413.60

25,000.00 336,544.00
23,000.00 232,215.36
40,500.00 463,421.09
50,500.00 883,764.54
2,368,260.13

A. 4.7.1.10 26,783.00 6,990,363.00

70,000.00 365,400.00

115,000.00 1,890,945.00

110,000.00 180,873.00

50,000.00 32,625.00

20,000.00 522,000.00

31,000.00 809,100.00

47,000.00 3,189,420.00

6,990,363.00

Ls 150,000.00 2,400,000.00
Ls 70,000.00 1,120,000.00
Ls 15,000.00 15,000.00
Ls 50,000.00 150,000.00
3,685,000.00

Ls 400,000.00 1,200,000.00
Ls 750,000.00 3,000,000.00
Ls 350,000.00 6,300,000.00
Ls 250,000.00 4,500,000.00
Ls 250,000.00 1,000,000.00
-
-
16,000,000.00
BACK UP DATA
KEGIATAN : Pembangunan Sarana Dan Prasarana
PEKERJAAN : Rehabilitasi Pagar Pacuan Kuda BAGIAN DALAM
LOKASI : Kabupaten Bima
TAHUN ANGGARAN : 2013

NO URAIAN KEGIATAN /SKETSA GAMBAR URAIAN PERHITUNGAN


1 2 3

I. PEKERJAAN PERSIAPAN

1 Papan Nama Kegiatan Vol. = 1.00 a

Pengukuran dan Pemasangan Bowplank Vol. = 1.00 a

II PEKERJAAN TANAH DAN PASIR

1 Galian Tanah Biasa Induk Vol. a = P x L x


Panjang Galian = 1 m = 1.00 x 0.00 x
Lebar Galian = m
Tinggi Galian = m = 0.00

Galian Tanah Biasa Emperan Vol. a = P x L x


Panjang Galian = m = 0.00 x 0.00 x
Lebar Galian = m
Tinggi Galian = m = 0.00

2 Urugan Kembali Vol. = 0.25 x Volume Galian


= 0.25 x 0.00
= 0.00

3 Urugan Tanah Pilihan


Bawah Lantai
Lebar = Vol. = L x P x
Panjang =
Tinggi Urugan = = 0.00 x 0.00 x
= 0.00

4 Urugan Pasir
Bawah Pondasi Induk
Panjang Urugan = 1 m Vol. = V x T x
Lebar Urugan = 0.0 m
Tinggi Urugan = 0.05 m = 1.00 x 0.0 x
= 0.00
Urugan Pasir
Bawah Pondasi Emperan
Panjang Urugan = 12 m Vol. = V x T x
Lebar Urugan = 0.5 m
Tinggi Urugan = 0.05 m = 12.00 x 0.5 x
= 0.30
Bawah Lantai
Lebar = 0 Vol. = L x P x
Panjang 0
Tinggi Urugan = 0.05 = 0.00 x 0.00 x
= 0.00

III. PEKERJAAN PASANGAN DAN PLESTERAN

1 Pasangan Pondasi Batu Kali 1Pc : 5Ps Biasa


Panjang Pondasi = 1 m Vol. = P x La +
Lebar Atas Pondasi = 0.3 m 2
Lebar Bawah Pondasi = 0.5 m = 1.00 x 0.3 +
Tinggi Pondasi = 0.50 m 2
JUMLAH 7 = 1.00 x 0.38
A
= 0.19 X 7.00 .=

Pasangan Pondasi Batu Kali 1Pc : 5Ps Emperan


Panjang Pondasi = 0 m Vol. = P x La +
Lebar Atas Pondasi = 0.3 m 2
Lebar Bawah Pondasi = 0.4 m = 0.00 x 0.3 +
Tinggi Pondasi = 0.35 m 2
= 0.00 x 0.33

= 0.00

2 Pas. Batu Kosong Induk


Panjang = 1 m Vol. = V x L x
Lebar = 0.6 m = 1.00 x 0.6 x
Tinggi = 0.2 m = 0.12

Pas. Batu Kosong Emperan


Panjang = 0 m Vol. = V x L x
Lebar = 0.5 m = 0.00 x 0.5 x
Tinggi = 0.2 m = 0.00

3 Pasngan Bata
Panjang = 30 m Vol. = V x T
Tinggi = 3.5 m = 30.00 x 3.5
= 105.00
Pasngan Bata
Panjang = 7 m Vol. = V x T
Tinggi = 2.13 m = 7.00 x 2.13
= 14.91

Kurang Kusen PJ
Lebar = 0.92 m Vol. = L x T x
Tinggi = 2.52 m = 0.92 x 2.52 x
Jumlah = 1 = 2.32

Kurang Kusen PJ
Lebar = 1.47 m Vol. = L x T x
Tinggi = 1 m = 1.47 x 1 x
Jumlah = 1 = 1.47

Kurang JV
Lebar = 2 m Vol. = L x T x
Tinggi = 1 m = 2.00 x 1 x
Jumlah = 5 = 10.00

Kuran V Gewel
Lebar = 0.71 m Vol. = L x T x
Tinggi = 1.07 m = 0.71 x 1.07 x
Jumlah = 4 = 3.04

Kuran V Gewel = 16.83 M2

Volu Cet Kayu 67.31

4 Plesteran 1Pc : 5Ps, tebal 15 mm


Vol. = 2.00 x V. Pas. Bata
= 2.00 x 103.08
= 206.17 X 4.00

IV. PEKERJAAN BETON


1 Pekerjaan Sloof Uk. 15/20
- Pasang Bekisting untuk Sloof ( Asumsi 3 Kali Pemakaian)
Panjang = 1.00 m Vol. = P x L x
Lebar = 0.2 m = 1.00 x 0.20 x
Jumlah = 2 m = 0.40

- Pembesian
Besi induk @ 12 mm = 120.50 m' Vol. = Bj. 12 Besi
x induk @ 12 mm
= 0.87 x 120.50
= 104.35

Cincin @ 6 mm = 114.30 m' Vol. = Bj. 6 x Cincin @ 6 mm


= 0.22 x 114.30
= 25.37

- Beton K175
Panjang = 1.00 m Vol. = P x L x
Lebar = 0.2 m = 1.00 x 0.20 x
Tinggi = 0.15 m = 0.03

3 Pekerjaan Kolom Induk Uk. 30x30


- Pasang Bekisting untuk Kolom ( Asumsi 3 Kali Pemakaian)
Panjang = 0.06 m Vol. = P x L x
Tinggi = 3.5 m = 0.06 x 3.50 x
Jumlah = 2 m = 0.44
- Pembesian
Berat Besi = 148.70 m' Vol. = Bj. 12 x Berat Besi
= 0.87 x 148.70
= 128.77
- Pembesian
Berat Besi = 123.83 m' Vol. = Bj. 6 x Berat Besi
= 0.22 x 123.83
= 27.49

- Beton K175
Panjang = 0.15 m Vol. = P x L x
Lebar = 0.2 m = 0.15 x 0.20 x
Tinggi = 3.5 m = 1.05
Jumlah = 10 m

4 Pekerjaan Kolom Teras Uk. 20x20


- Pasang Bekisting untuk Kolom ( Asumsi 3 Kali Pemakaian)
Panjang = 0.80 m Vol. = P x L x
Tinggi = 2.4 m = 0.80 x 2.40 x
Jumlah = 4 m = 7.68

- Pembesian
Berat Besi = 38.60 Kg Vol. = Bj. 12 x Berat Besi
= 0.87 x 38.60
= 33.43
- Pembesian
Berat Besi = 38.55 m' Vol. = Bj. 6 x Berat Besi
= 0.22 x 38.55
= 8.56

- Beton K175
Panjang = 0.20 m Vol. = P x L x
Lebar = 0.2 m = 0.20 x 0.20 x
Tinggi = 2.4 m = 0.38
Jumlah = 4 m

6 Pekerjaan Balok Uk. 11/15


- Pasang Bekisting untuk Balok ( Asumsi 3 Kali Pemakaian)
Panjang = 8.00 m Vol. = P x L x
Tinggi = 0.3 m = 8.00 x 0.30 x
Jumlah = 1 m = 2.40

- Pembesian
Berat Besi = 120.50 Kg Vol. = Bj.12 x Berat Besi
= 0.87 x 120.50
= 104.35
Cincin @ 6 mm = 70.00 m' Vol. = Bj. 6 x Cincin @ 6 mm
= 0.22 x 70.00
= 15.54

- Beton K175
Panjang = 8.00 m Vol. = P x L x
Lebar = 0.11 m = 8.00 x 0.11 x
Tinggi = 0.15 m = 0.13
Jumlah = 1 m

7 Beton Gewel
- Panjang
Panjang Total = 10.77 m Vol. = P 2.00
= 10.77 x 2.00
= 21.54

V. PEKERJAAN KKUSEN
1 Kusen Kayu Klas I ( Jati) Panjang Keseluruhan Kusen =
Panjang Jumlah
JV = 10 x 5 = 50 m' = T x L x
PV = 6.88 x 1 = 6.88 m' = 0.06 x 0.12 x
JV = 6.41 x 1 = 6.41 m' = 0.55
V.Gewel = 3.26 x 4 = 13.04 m'
76.33

2 Memasang Daun Pintu Panil


, , , ,
Lebar = 0.8 = L x T x
Tinggi = 2 = 0.80 x 2.00 x
Jumlah = 1 = 1.60

3 Memasang Daun Jendelah Kaca

Lebar = 0.65 = L x T x
Tinggi = 0.8 = 0.65 x 0.80 x
Jumlah = 12 = 6.24

4 Memasang Kaca Mati

Lebar = 0.65 = L x T x
Tinggi = 0.8 = 0.65 x 0.80 x
Jumlah = 10 = 5.20

5 Memasang Krepeye

Lebar = 12.39 = L x T x
Tinggi = 0.15 = 12.39 x 0.15 x
Jumlah = 1 = 1.86

VI. PEKERJAAN PLAFOND


1 Memasang Rangka Plafoond kayu 5/7 dan 4/6
Panjang = 29 = P x L x
Lebar = 9 = 29.00 x 9.00 x
Jumlah = 1 = 261.00

2 List Plafond
Panjang List Plafond = 120 m' 29.00 2.00 +
58.00 +
130.00
VII. PEKERJAAN LANTAI
1 Pemasangan Keramik 30 x 30 cm
Panjang = 29 = P x L x
Lebar = 9 = 29.00 x 9.00 x
Jumlah = 1 = 261.00

VIII. PEKERJAAN ATAP


1 Pasang Rangka Atap Baja Ringan Bangunan Induk
Panjang Areal Miring = 4.75 v = P x L x
Lebar Bangunagan + Tritisan = 29 = 4.75 x 29.00 x
Jumlah 2 sisi = 2 = 275.50

Pasang Rangka Atap Baja Ringan Emperan


Panjang Areal Miring = 2.8 v = P x L x
Lebar Bangunagan + Tritisan = 29 = 2.80 x 29.00 x
Jumlah 2 sisi = 1 = 81.20

2 Bubungan Atap Metal Roof


Panjang Bubungan = 30.5 v = 30.50

11 Lisplang ( 2 x 25 ) cm, Kayu Klas I


Panjang Lisplan = 83.6 v = P x T. Papan
T. Papan = 0.5 = 83.60 x 0.50

12 Rangka AtapGording ,Nok

Panjang = 14 v = P x L x
Vol.Kayu 6/14 = 0.02 = 14.00 x 0.02 x
Jumlah = 2 = 0.56

Gording danNok

Panjang = 261 v = P x L x
Vol.Kayu 6/14 = 0.014 = 261.00 x 0.01 x
Jumlah = = 3.65

Memasang Konstruksi Kuda - Kuda Expose, Kayu Klas II


Panjang = 14 v = P x L x
Vol.Kayu 5/10 = 0.010 = 14.00 x 0.01 x
Jumlah = 1 = 0.14

Memasang Total

MEGETAHUI DI SETUJUI
PEJABAT PEMBUAT KOMITMEN KONSULTAN PENGAWAS
( PPK ) CV. ANDESA Consultant
TAUFIQURRAHMAN, ST JIHADUDDIN, ST
NIP. 19770921 200501 1 004 Pengawas Lapangan
pondasipondasiluas lantai

14 4
16 8
30 12
RHITUNGAN VOLUME 4
3 4 30.5
1
- 2
- 6
1.00 - 1
- 3
1.00 - 10.5
- 10.5
- 5.5
- 4
- 6.5
T - 10.5
0.00 - 6.5
- 6 8.82
0.00 m3 - 12 0.03
- 17.5 294
T - 12
0.00 - 5

0.00 m3
Total Galian 0.00 m3

- 5
0.00 m 3
- 3
- 1.5
- 4.5

T 0.00 m3

0.00

- 4

T - 9
- 12.5
0.05 0.00 m3 - 16
- 4.5

T
0.05 0.30 m3
Total Urugan Pas 0.30 m3
- 274
T

0.05 0.00 m3

-
-
-
Lb x T -
-
0.5 x 0.5 0.19 m3 -
-
0.38 x 0.5 -
-
1.3125

81
Lb x T

0.4 x 0.346 0.00 m3

0.33 x 0.346

Total Pas. Pond 0.19 m3

T
0.2 0.12 m3

1100
T 1250
0.2 0.00 m3
Total Pas. Koso 0.12 m3

150
1200

105.00
64

14.91
14.91 7.46

119.91

9,600.00
Jumlah 2.32
1 336,000.00

1 0.92 1

Jumlah
1
1.47

2 2.52 1.47
Jumlah
5
10.00
14.91

Jumlah
4
3.04 120
103.08

V. Total Pas. Bata 103.08 M2 122.0500352

81.40
206.17 m2 824.6624

824.6624 0.43 354.27497

T 0.08 M2
2.00

T. Pokok Cincin
104.35 Kgf 120 200
10 114

25.37 Kgf

129.73 kg

0.5
T 0.03 M3
0.15

T 0.0875 M2
2.00
148 24.667
128.77 Kgf 246.67
0.5
123.33

27.49 Kgf

156.27 Kg

T x Jumlah 1.05 M3
3.50 x 10.00

T 1.536 M2
4.00

81
38.4 16.00
33.43 Kgf 64
38.4

8.56 Kgf

41.99 Kg

T x a 0.38 M3
2.40 x 4.00

T 0.48 M2
1.00 ,
,

104.35 Kgf 120 200


70

15.54 Kgf

119.89 kg

T x a 0.13 M3
0.15 x 1.00
21.54 m' dak 1 dak 2 dak 3 dak 4 dak 5

76.33 0.55 m3 2.198304 0.88


0 -
P 0 -
76.33 0 -
0 -
0 -
0 -
0 -
0 -
, 1.60 m2 6.4 6.40
Jumlah 0 -
1 0 -
0 -
0 -
0 -
0 -
6.24 m2 24.96 9.98
Jumlah 0 -
12 0 -
0 -
0 -
0 -
5.20 m2 20.8 7.70
Jumlah 0 -
10 0 -
0 -
0 -
0 -
1.86 m2 7.434 1.49
Jumlah 0 -
1 0 - 10
0 - 2.39
0 - 12.39
0 -
0 -
261.00 m2 1566 1,566.00
Jumlah 0 -
1 0 -
0 -
0 -
0 -
9 8 130.00 m' 910 910.00
72 0 -
0 -
0 -
261.00 m2 104.4 104.40
Jumlah 0 -
1 0 -
52.2 313.2 97.09
0 -
0 -
0 -
0 -
0 -
2 Sisi 275.50 1102 275.50
2 0 -
0 -
0 -
0 -
2 Sisi 81.20 487.2 487.20
1 0 -
356.70 m2 238.989 238.99
0 -
0 -
0 -
30.50 m' 213.5 213.50
0 -
0 -
0 -
41.80 m2 292.6 292.60
0 -
0 -
0 -
0 - 30 2 11.8 2
2 Sisi 0 -
2 0 - 11 125
0.56 0.536032 0.26
0 -
0 -
0 -
2 Sisi 0 -
0 -
3.65 1.0962 0.54
1.632232
0 -
2 Sisi 0 -
1 0 -
0.14 0.98 0.20
0 -
4.35 30.478 6.10
0 -
0 -
0 -

DISETUJUI
KONTRAKTOR PELAKSANA
CV. DUNIA ADAM
LASKAR NUSANTARA
Direktur
luas lantai
dak 5
83.6
REKAPITULASI ANGGARAN BIAYA
KEGIATAN : Pembangunan Dan Rehabilitasi Ruang Kelas
PEKERJAAN : Rehabilitasi Ruang Kelas SDN DONGGOBOLO
LOKASI : Kecamatan WOHA
SUMBER DANA : APBN
TAHUN ANGGARAN : 2016

NO. URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PASANGAN DAN PLESTERAN

IV. PEKERJAAN BETON

V. PEKERJAAN KAYU

VI. PEKERJAAN PLAFOND

VII. PEKERJAAN LANTAI

VIII. PEKERJAAN ATAP


IX. PEKERJAAN PENGUNCI

X. PEKERJAAN PENGECATAN

XI. PEKERJAAN LISTRIK


XIII. PEKERJAAN TAMBAHAN MEUBLEAR

A. REAL COST
B. KONSULTAN PERENCANA DAN PENGAWAS 4 %
D. PPN 10%
JUMLAH ( C + D )
DIBULATKAN

Tiga Ratus Dua Puluh Lima Juta Lima Ratus Tiga Puluh Du
TERBILANG :
Rupiah

Bima, .25 Oktober 2


Disetujui Oleh, Di Hitung
Pejabat Pembuat Komitmen Pendidikan Dasar
Dinas Pendidikan, Pemuda dan Olahraga Konsultan Perenca
Kabupaten Bima SMKN 10 BIMA
SYAHRAINI, S.Sos. JOHAN KURNIAWAN
NIP. 1961312 198411 2 082 NIP. 19730615 201406

Mengetahui
Kepala Dinas Pendidikan, Pemuda dan Olahraga
Kabupaten Bima

TAJUDDIN, SH, M. Si
NIP. 19681231 199303 1 120
RAN BIAYA

JUMLAH HARGA

Rp 450,000.00

Rp -

Rp 32,085,368.40

Rp 4,606,614.69

Rp 20,955,345.33

Rp 46,072,580.00

Rp 21,240,180.00

Rp 106,877,078.36
Rp 2,137,000.00

Rp 31,445,556.19

Rp 3,685,000.00
Rp 16,000,000.00

Rp 285,554,722.98
Rp 11,422,188.92
Rp 28,555,472.30
Rp 325,532,384.20
Rp 325,532,000.00

ima Ratus Tiga Puluh Dua Ribu

Bima, .25 Oktober 2016


Di Hitung

Konsultan Perencana
SMKN 10 BIMA
JOHAN KURNIAWAN , ST
NIP. 19730615 201406 1 003

getahui
an, Pemuda dan Olahraga
aten Bima

N, SH, M. Si
31 199303 1 120
tiga ratus dua puluh
325,532,000.00
PEMERINTAH KABUPATEN BIMA
DINAS PENDIDIKAN PEMUDA DAN OLAHRAGA
SMK NEGERI 10 BIMA
Jalan Lintas Teke Palibelo Bima . Email smkn10_bima@yahoo. Co.id

LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN REHABILITASI RUANG KELAS


Kegiatan : Pembangunan Dan Rehabilitasi Ruang Kelas
Pekerjaan : Rehabilitasi Ruang Kelas SDN DONGGOBOLO
Lokasi : Kecamatan WOHA
Sumber Dana : APBN
Tahun Anggaran : 2014

Waktu Pelaksanaan Pekerjaan Selama 120 Hari Kalender


Jumlah Harga Bulan I Bulan II Bulan III
No. Uraian Pekerjaan Bobot (%)
(Rp) Minggu Minggu Minggu
1 2 3 4 1 2 3 4 1 2 3

I PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan 150,000.000 0.053 0.053
2 Pengukuran dan Pemasangan Bowplank 300,000.000 0.105 0.105
450,000.000
II PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Biasa - - -
2 Urugan Kembali - - -
3 Urugan Tanah - - -
4 Urugan Sirtu - - -

III PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan Pondasi Batu Kali 1Pc : 5Ps 120,786.563 0.042 0.021 0.021
2 Pasangan Pondasi Batu Kosong 37,931.400 0.013 0.013
3 Pasangan Bata Merah tebal 1/2 Bata, 1Pc : 5Ps 13,591,858.070 4.762 4.762
4 Plesteran 1Pc : 5Ps, tebal 15 mm 18,334,792.369 6.424 6.424
32,085,368.402
IV PEKERJAAN BETON
1 Pekerjaan Sloof Uk. 15/20 -
Pasang Bekisting untuk Sloof ( Asumsi 3 Kali Pemakaian) - - -
Pembesian 1,961,586.000 0.687 0.687
Beton K175 - - -
2 Pekerjaan Ring Balok Uk. 11/15 49,497.600 0.017 0.017
3 Pekerjaan Kolom Teras Uk. 20/20 - -
Pasang Bekisting untuk Kolom ( Asumsi 3 Kali Pemakaian) - - -
Pembesian - - -
Beton K175 98,176.980 0.034 0.034
4 Pekerjaan Kolom Uk. 25/25 -
Pasang Bekisting untuk Kolom ( Asumsi 3 Kali Pemakaian) 18,837.875 0.007 0.007
Pembesian 2,322,179.005 0.814 0.814
Beton K175 - - -
5 Pekerjaan Beton Gewel - - -
6 Pekerja - -
Pekerja - - -
Tukang Batu - - -
Tukang Kayu - - -
7 Tukang Besi Beton - -
Kepala Tukang Batu - - -
Mandor - - -
Bahan - - -
8 Papan Kayu Kls III - -
4,450,277.460
V PEKERJAAN KUSEN
1 Kusen Pintu dan Jendelah Kayu Klas I 9,026,456.054 3.163
2 Memasang Daun Pintu Panil 4,684,800.000 1.641
3 Memasang Daun Jendelah Kaca 5 mm 5,257,574.400 1.842
4 Kaca Polos 5 MM 1,079,864.240
5 Pemasangan Krepeye 906,650.640
20,955,345.334
VI PEKERJAAN PLAFOND
1 Memasang Langit - Langit Tripleks ( 120 x 240 ) cm, Tebal 3 mm 32,416,200.000 11.358
2 Memasang Tripleks 3 mm 10,317,330.000
3 List Plafond 3,339,050.000 1.170
46,072,580.000
VII PEKERJAAN LANTAI
1 Pasang Lantai Keramik 30 x 30 Cm 21,240,180.000 7.442

VIII PEKERJAAN ATAP


1 Memasang rangka atap dan kuda2 66,534,701.114 23.313 18.650
2 Atap Metal Roof 34,811,244.750 12.197 12.197
3 Bubungan Atap Metal Roof 1,867,362.500 0.654 0.654
4 Lisplang ( 3 x 20 ) cm, Kayu Klas II 3,663,770.000 1.284
106,877,078.364
IX. PEKERJAAN PENGUNCI
1 Kunci Pintu 2 Slag KW I 1,080,000.000 0.378
2 Engsel Nylon 145,000.000 0.051
3 Engsel Kupu-kupu 192,000.000 0.067
4 Hag angin Besar 480,000.000 0.168
5 Angkel Kusen 240,000.000 0.084
### 2,137,000.000
X. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Baru 22,086,933.059 7.739
2 1 M2 Pengecatan Bidang Kayu Baru 2,368,260.128 0.830
3 Pengecatan Plafond 6,990,363.000 2.449
### 31,445,556.187

XII. PEKERJAAN LISTRIK


1 Titik Lampu 2,400,000.000 0.841
2 Lampu TL 20 Watt 1,120,000.000 0.392
3 Saklar Engkel 15,000.000 0.005
4 Stop Kontak Tanam 150,000.000 0.053
3,685,000.000
XII. PEKERJAAN TAMBAHAN MEUBLEAR
1 Kursi Guru 1,200,000.000 0.420
2 Meja Guru 1/2 Biro 3,000,000.000 1.051
3 Meja Siswa 6,300,000.000 2.207
4 Kursi Siswa 4,500,000.000 1.577
5 Papan Tulis 1,000,000.000 0.350
16,000,000.000
Jumlah 285,398,385.75 100.000
Manajemen 4 % 11,415,935.43
Pajak 10 % 28,539,838.57
Total 325,532,384.20
Rencana Fisik Mingguan 0.158 0.013 0.021 0.708 0.814 0.041 4.762 0.017 6.424 18.650 12.852
Rencana Fisik Komulatif 0.158 0.171 0.192 0.901 1.714 1.755 6.518 6.535 12.959 31.610 44.461

Bima , Oktober 2016


MENGETAHUI DI BUAT OLEH
Kepala Sekolah Perencana dan Pengawas,
SDN DONGGOBOLO SMKN 10 Bima
NURDIN, S.Pd Johan Kurniawan, ST
NIP.19711206 199302 1 002 Nip. 19730615 201406 1 003
ender
II Bulan IV
Ket.
u Minggu
4 1 2 3 4

100

90
90

80

70

60

-
50

11.358

1.170

4.465
40

1.284

30

20
20

10

13.812 4.465 - - -
58.273 62.739 62.739 62.739 62.739

Oktober 2016

dan Pengawas,
N 10 Bima
niawan, ST
15 201406 1 003
W CV. WAJAR
ompleks Pasar Tente Desa Tent
METHODE PELAKSANAAN

KEGIATAN : Pembangunan Dan Rehabilitasi Ruang Kelas


PEKERJAAN : Rehabilitasi Ruang Kelas SDN DONGGOBOLO
LOKASI : Kecamatan WOHA
SUMBER DANA : APBN
T.A : 2014

I. UMUM
1.1. Lingkup Pekerjaan
Sesuai yang tertuang dalam Dokumen Lelang, hasil Aanwijing dan Risalah ka
menyimpulkan bahwa pekerjaan terdiri dari :
a. Pekerjaan pendahuluan
Pekerjaan pendahuluan meliputi pekerjaan : Pekerjaan persiapan/pembuatan Dire
Keet, Pematokan dan Pengukuran, pembongkaran atap bangunan lama, pho
dokumentasi proyek 0%, pemberitahuan instansi terkait, mobilisasi personil d
peralatan, penyiapan rencana kerja dan jaminan mutu serta penyiapan Gambar Ke
(Shoop Drawing).

b. Pekerjaan Fisik Lapangan


Pekerjaan Fisik Lapangan meliputi pekerjaan : mulai pekerjaan Tanah Sampai Pekerja
Instalsi Listrik dan lain lain.
c. Pekerjaan Akhir
Pekerjaan akhir meliputi pekerjaan : Pekerjaan pembersihan lokasi, pembuat
Dokumentasi akhir pekerjaan serta laporan hasil akhir pekerjaan yang diuser
pemeriksaan PHO.

1.2 Lokasi Pekerjaan


Lokasi Pekerjaan berada di : Desa Tente Kec. Woha Kabupaten Bima.

1.3 Waktu Pelaksanaan Pekerjaan


Berdasarkan isi dari dokumen lelang, jangka waktu pelaksanaan pekerjaan ditetapkan 12
seratus dua puluh) hari kalender, dengan masa pemeliharaan selama 180 ( seratus delap
puluh ) hari kalender.

1.4 Material
a. Urugan Tanah
Berdasarkan gambar pelelangan dan dokumen lelang didefinisikan bahwa Urugan Tan
yang dipergunakan adalah Urugan Tanah biasa hasil galian yang diperoleh pada seki
lokasi kegiatan dan urugan tanah untuk peninngi bangunan.
Berdasarkan gambar pelelangan dan dokumen lelang didefinisikan bahwa Urugan Tan
yang dipergunakan adalah Urugan Tanah biasa hasil galian yang diperoleh pada seki
lokasi kegiatan dan urugan tanah untuk peninngi bangunan.

b. Batu dan pasir


Lokasi batu yang digunakan untuk bahan pekerjaan pasangan batu dapat diperol
disekitar sungai dan bukit pada desa lokasi pekerjaan/desa lain di sekitarnya. Kesedia
material pasir sebagai bahan pasangan dan pekerjaan beton dapat diperoleh di sung
pada sekitar lokasi pekerjaan/lokasi lain yang terdekat.

c. Semen
Berdasarkan spesifikasi teknik dan dokumen lelang didefinisikan bahwa semen PC ya
dipergunakan adalah semen PC yang memenuhi Standar Nasional Indonesia (SNI) N.I
atau sesuai dengan persetujuan direksi teknik dan diperoleh di toko/distribu
terdekat.

d. Besi
Berdasarkan spesifikasi teknik dan dokumen lelang didefinisikan bahwa Besi ya
dipergunakan adalah Besi Polos yang memenuhi Standar Nasional Indonesia (SNI) N.I
atau sesuai dengan persetujuan direksi teknik dan diperoleh di toko/distribu
terdekat.

e. Batu Bata
Berdasarkan spesifikasi teknik dan dokumen lelang didefinisikan bahwa Batu bata ya
berukuran 6 x 12 x 24 Cm yang dipergunakan adalah Bata yang memenuhi Stand
Nasional Indonesia (SNI) N.I.8. atau sesuai dengan persetujuan direksi teknik d
diperoleh di toko/distributor terdekat.

f. Kayu
Berdasarkan spesifikasi teknik dan dokumen lelang didefinisikan bahan kayu ya
dipakai adalah balok kayu kls I untuk kusen, papan kayu kls I untuk daun pintu, lispla
dan daun jendela. kayu dipakai benar benar berumur dan berkualitas baik atau sesu
dengan persetujuan direksi teknik dan diperoleh di toko/distributor terdekat.

g. Rangka Baja Ringan


Berdasarkan spesifikasi teknik dan dokumen lelang didefinisikan bahwa baja ya
dipergunakan adalah baja ringan yang memenuhi Standar Nasional Indonesia (S
N.I.8. atau sesuai dengan persetujuan direksi teknik dan diperoleh di toko/distribu
terdekat.

h. Bahan Atap Metal Roof


Berdasarkan spesifikasi teknik dan dokumen lelang didefinisikan bahwa batan at
yang dipakai menggunakan bahan atap metal Roof yang berkualitas baik atau sesu
dengan persetujuan direksi teknik dan diperoleh di toko/distributor terdekat.

1.5 Sumber Tenaga Kerja


Tenaga kerja yang dipakai pada pelaksanaan pekerjaan ini adalah tenaga lokal, sedangk
tenaga skiil/ahli adalah tenaga tetap Perusahaan.
II. PELAKSANAAN PEKERJAAN SECARA UMUM
Tahapan pelaksanaan pekerjaan dibagi menjadi tiga tahap yaitu :
2.1 Pekerjaan Persiapan :
Pekerjaan persiapan yang akan dilakukan meliputi :
- Pemberitahuan ke instansi terkait.
- Pemasangan Papan Nama Proyek
- Penyiapan kantor lapangan (direksi keet)
- Mobilisasi personil dan peralatan
- Pembersihan lokasi pekerjaan
- Pengukuran dan pematokan
- Penyiapan rencana kerja dan jaminan mutu (quality assurance)
- Penyiapan gambar kerja (shoop drawing)

2.2 Pekerjaan Fisik Lapangan


Pekerjaan fisik lapangan terdiri dari :
I. PEKERJAAN TANAH
1. Galian Tanah Biasa
2. Urugan Kembali
3. Urugan Tanah
4. Urugan Sirtu

II PEKERJAAN PASANGAN DAN PLESTERAN


1. Pasangan Pondasi Batu Kali 1Pc : 5Ps
2. Pasangan Pondasi Batu Kosong
3. Pasangan Bata Merah tebal 1/2 Bata, 1Pc : 5Ps
4. Plesteran 1Pc : 5Ps, tebal 15 mm
5. Err:509
6. Err:509

III PEKERJAAN BETON


1. Pekerjaan Sloof Uk. 15/20
Pasang Bekisting untuk Sloof ( Asumsi 3 Kali Pemakaian)
Pembesian
Beton K175
2. Pekerjaan Ring Balok Uk. 11/15
3. Pekerjaan Kolom Teras Uk. 20/20
Pasang Bekisting untuk Kolom ( Asumsi 3 Kali Pemakaian)
Pembesian
Beton K175
4. Pekerjaan Kolom Uk. 25/25
Pasang Bekisting untuk Kolom ( Asumsi 3 Kali Pemakaian)
Pembesian
Beton K175
5. Pekerjaan Beton Gewel
6. Err:509
Err:509
Err:509
Err:509
7. Err:509
Err:509
Err:509
Err:509
8. Err:509

IV PEKERJAAN KUSEN
1. Kusen Pintu dan Jendelah Kayu Klas I
2. Memasang Daun Pintu Panil
3. Err:509

V PEKERJAAN PLAFOND
1. Memasang Langit - Langit Tripleks ( 120 x 240 ) cm, Tebal 3 mm
2. List Plafond

VI PEKERJAAN LANTAI
1. Pasang Lantai Keramik 30 x 30 Cm
2. Err:509
3. Err:509

VII PEKERJAAN ATAP


1. Pasang Rangka Atap Kayu
2. Atap Metal Roof
3. Bubungan Atap Metal Roof
4. Lisplang ( 3 x 20 ) cm, Kayu Klas II

VIII PEKERJAAN PENGUNCI


1. Kunci Pintu 2 Slag KW I
2. Engsel Nylon
3. Engsel Kupu-kupu
4. Hag angin Besar
5. Angkel Kusen

IX PEKERJAAN PENGECATAN
1. Pengecatan Tembok Baru
2. Pengecatan Plafond

X Err:509
1. Err:509
2. Err:509
3. Err:509
4. Err:509
5. Err:509
6. Err:509

XI PEKERJAAN LISTRIK
1. Titik Lampu
2. Lampu TL 20 Watt
3. Err:509
4. Saklar Engkel
5. Err:509
6. Err:509
7. Stop Kontak Tanam

XII PEKERJAAN TAMBAHAN MEUBLEAR


1. Kursi Guru
2. Err:509

III. PEKERJAAN PENDAHULUAN

3.1 Pekerjaan Pendahuluan


Pekerjaan Pendahuluan terdiri atas : pemberitahuan ke instansi terkait, penyiapan kan
lapangan, mobilisasi personil/pekerjaan, mobilisasi alat, rencana kerja, pengukuran d
gambar kerja.

Waktu pelaksanaan pekerjaan adalah setelah diterimanya SPMK sampai kegiat


pekerjaan fisik lapangan siap dilaksanakan. Untuk penjelasan masing-masing ite
pekerjaan persiapan dapat dilihat berikut ini.

3.2 Pemberitahuan Instansi Terkait.


Untuk kelancaran pelaksanaan pekerjaan, maka sejak dikeluarkannya Surat Perintah Mu
Kerja (SPMK) maka kontraktor membuat surat pemberitahuan ke instansi terkait (Bupa
Camat, dan Kepala Desa) tentang pelaksanaan pekerjaan tersebut.

Surat pemberitahuan tersebut diatas adalah tentang jadwal pelaksanaan pekerjaan.

3.3 Mobilisasi Personil


Setelah SPMK diterima, sesegera mungkin tim inti pelaksana yang terdiri atas pimpin
teknik, kepala pelaksana, pelaksana, juru ukur, dimobilisasi ke lapangan dalam rang
survey/pengukuran dan penyiapan kantor lapangan agar pelaksanaan pekerjaan dap
dimulai.

3.4 Penyiapan Kantor Lapangan


Untuk menunjang kelancaran pelaksanaan pekerjaan fisik maupun non fisik kan
lapangan dan kantor direksi ditempatkan pada lokasi proyek.

Penyiapan kantor lapangan dan base camp akan diselesaikan dalam waktu 7 (tujuh) h
terhitung mulai proses penyewaan lokasi base camp sampai dengan siap ditempati.

3.5 Materi Pre Construction Meeting

Sebelum memulai tahapan pekerjaan konstruksi/fisik, akan dibuat Rencana Kerja (Wo
Plan) dan jaminan mutu (Quality Assurance) dan didiskusikan dalam Pre Constructi
Meeting untuk mendapatkan masukan dari Direksi atau instansi terkait untuk persetuju
lebih lanjut. Penyiapan materi ini akan dilaksanakan dalam waktu 3 (tiga) hari kalender.

3.6 Peralatan Kerja


Peralatan kerja akan dimobilisasi secara bertahap sesuai dengan kebutuhan (terinci dala
jadwal peralatan). Pada tahap awal pekerjaan akan dimobilisasikan sesegera mung
peralatan yang menunjang pekerjaan persiapan diantaranya alat ukur, peralatan, stud
gambar dan keperluan kantor/administrasi.

3.7 Pekerjaan Pengukuran


Pekerjaan pengukuran pematokan dilakukan pada minggu ke 2 bulan I dan pengukur
akhir pelaksanaan dilakukan pada minggu ke 4 bulan ke VI sesuai dengan jadw
pelaksanaan.

Perlengakapan yang disiapkan untuk pekerjaan pengukuran adalah :


- Rol Meter = 1 Unit - Benang
- Kayu 5/7 = 1 Set - Meter kecil

3.8 Penyiapan Gambar Kerja

Materi gambar kerja mengacu pada gambar pelelangan, dan dalam penjabarannya ak
disesuaikan dengan kondisi lapangan atau atas pengarahan Direksi.

IV. METHODE PELAKSANAAN PEKERJAAN FISIK

4.1 Pembongkaran Bangunan Lama


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan melampiri gambar kerja (shoop drawin
yang sudah disetujui.
* Melakukan pemotretan kondisi 0% sebelum memulai pekerjaan.
* Pekerjaan Pembongkaran dilakukan terlebih dahulu sebelum galian ponda
peralatan yang dipakai untuk pembongkaran bangunan lama linggis, palu besar d
lain-lain.

* Sisa pembongkaran bangunan lama bisa dipakai sebagai bahan timbunan d


sisanya dibuang jauh dari lokasi pekerjaan.
Sisa pembongkaran bangunan lama bisa dipakai sebagai bahan timbunan d
sisanya dibuang jauh dari lokasi pekerjaan.

* Melakukan pemeriksaan secara bersama-sama dengan direksi atas hasil pekerja


sebelum dilakukan opname pekerjaan, mengambil dokumen pekerjaan sebag
bahan laporan.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan tangan akibat terkena palu, linggis dan jepitan kayu bongkara
serta luka kepala akibat tertimpah genteng, kayu dan lbahan ain-lain.
* Pengendalian Resiko K3
- Hati - hati dalam pembongakaran bangunan lama, tidak diperbolekan bercan
pada saat berkerja, memakai kaos tangan kerja, sepatu kerja dan helm ke
untuk menjaga keselaman kerja.

c. Rencana Waktu Pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 1 bulan ke I sesuai dengan jadw
pekerjaan.

d. Perhitungan Analisa
* Volume Pembongkaran Bangunan Lama : Err:509

PEKERJAAN TANAH
4.2 Galian Tanah
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan melampiri gambar kerja (shoop drawin
yang sudah disetujui.
* Melakukan pemotretan kondisi 0% sebelum memulai pekerjaan.
* Setelah selesai pemasangan bouplank maka diteruskan dengan pengalian pond
bangunan dengan ukuran yang tercantum dalam bestek serta atas petunjuk direk

* Pekerjaan Galian Tanah dengan mengunakan tenaga dengan manusia ya


diperbantukan dengan peralatan tembilang, scop dan lain - lain yang dap
dilakukan setelah mendapat persetujuan Direksi, menggunakan tenaga manusia .

* Galian tanah dilakukan sesuai kebutuhan konstruksi yaitu untuk pondasi pasang
pondasi batu kali yang tercantum dalam bestek atau sesuai petunjuk direksi.
* Tanah galian dari sisa galian dapat dipakai sebagai bahan urugan kembali d
bahan urugan tanah diatas lantai dan tanah sisa galian yang tidak berguna har
disingkirkan jauh dari lokasi pekerjaan.
* Melakukan pemeriksaan secara bersama-sama dengan direksi atas hasil pekerja
sebelum dilakukan opname pekerjaan, mengambil dokumen pekerjaan sebag
bahan laporan.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan tangan akibat terkena tembilang atau scop pada saat pengalia

* Pengendalian Resiko K3
- Hati - hati dalam pelaksanaan galian pondasi, hindari bercanda dalam berker
galian harus dilakukan dua arah yaitu yang mulai dari titik nol dan yang mu
dari titik akhir serta hindari pada saat galian saling membelakangi dan har
berhadapan agar dapat melihat rekan kerja yang gali, memakai sepatu ker
helm kerja dan kaos tangan kerja.

c. Rencana Waktu Pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan ke I sesuai dengan jadw
pekerjaan.

d. Perhitungan Analisa
* Volume galian tanah : -

4.3 Urugan Kembali


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan melampiri gambar kerja (shoop drawin
yang sudah disetujui.
* Melakukan pemotretan kondisi 0% sebelum memulai pekerjaan.
* Pekerjaan Urugan Kembali dengan mengunakan tenaga manusia dapat dilakuk
setelah mendapat persetujuan Direksi, menggunakan tenaga manusia d
peralatan scop serta dipadatkan dengan stampel.

* Pekerjaan urugan kembali dengan menggunakan tenaga manusia yang dimaks


adalah untuk urugan tanah bekas galian pada sisi dalam dan sisi luar pasang
pondasi batu kali.

* Urugan Kembali dilaksanakan sesuaikan bestek dan petunjuk Direksi


* Pekerjaan urugan tanah kembali sisa galian dilaksanakan setelah pemasang
pondasi, urugan tanah sisa galian pada sela-sela pasangan pondasi pada gali
pondasi kiri dan kanan pasangan dan sebagai bahan urugan peninggi lantai dala
ruang dan emperan.

Urugan Tanah Sisa Galian


pada kiri pasangan dan kanan
pasangan
* Melakukan pemeriksaan secara bersama-sama dengan direksi atas hasil pekerja
sebelum dilakukan opname pekerjaan, mengambil dokumen pekerjaan sebag
bahan laporan.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan tangan akibat terkena scop dan tertimpa peralatan stamp
pada saat stampel pada saat memasukan tanah sisa galian dan pada sa
pemadatan tanah urugkan kembali. keselah kiri maupun kanan pasang
pondasi batu kali.

* Pengendalian Resiko K3
- Hati - hati dalam memasukan tanah sisa galian kedalam selah pondasi, hind
bercanda dalam berkerja, hindari tangan pada saat menghidupkan stamp
dan hindari kaki pada saat melaksanakan pemadatan tanah urugkan kemba
memakai sepatu kerja, kaos tangan dan helm kerja.

c. Rencana Waktu Pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu 1 bulan ke II sesuai dengan jadwal pekerjaan

d. Perhitungan Analisa
* Volume urugan kembali : -

4.4 Urugan Tanah


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan melampiri gambar kerja (shoop drawin
yang sudah disetujui.

* Melakukan pemotretan kondisi 0% sebelum memulai pekerjaan.


* Pekerjaan urugan tanah biasa untuk menggunakan bahan dan peralatan sesu
dengan kebutuhan yaituh bahan tanah urug dan peralatan dump truck sebagai a
pengangkut tanah urug dan penghamparan menggunakan skop, pacul sert
peralatan pemadatan menggunakan stamper .

* Urugan tanah peninggi lantai menggunakan tanah pilihan yang diambil dari qua
yang disetujui oleh direksi.

* Penggerukan tanah peninggi lantai dilakukan dengan hamparan per 15


kemudian di siram dan dilanjutkan dengan pemadatan menggunakan stap
demikian seterus sehingga mencapai ketinggian sesuai dengan bestek at
persetujuan direksi,

* Urugan Tanah harus digunakan Tanah pilihan atau sesuai petunjuk Direksi
Urugan Tanah urugan dengan
ketinggian dan lebar urugan
sesuai gambar.

* Melakukan pemeriksaan secara bersama - sama dengan direksi atas hasil pekerja
sebelum dilakukan opname pekerjaan, mengambil dokumen pekerjaan sebag
bahan laporan.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki akibat : terkena ban truck, scop pada saat penghamparan tanah ur
dan pada saat pemadatan tanah menggunakan stapel. Luka tangan akiba
terkena tutupan bak dump truck, menghidupkan peralatan stampel.

* Pengendalian Resiko K3
- Hati - hati dalam menggatur atrekan dump truck jauhkan dari kita ya
menggatur, jangan bercanda pada saat berkerja, mengatur jarak pada sa
penghamparan tanah urug dengan scop dan jauhkan kaki pada sa
memegang stampel pada saat pemadatan. Luka Tangan Hati hati tangan pa
saat membuka bak truck di usahakan diperhatikan betul pada saat menut
pintu bak truck, usahakan teliti dalam menghidupkan mesin stampel, mema
sepatu kerja, kaos tangan dan helm kerja.

c. Rencana Waktu Pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan ke II sesuai dengan jadw
pekerjaan.

d. Perhitungan Analisa
* Volume urugan Tanah : -

4.5 Urugan Pasir Di Pondasi Dan Bawah Lantai


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan melampiri gambar kerja (shoop drawin
yang sudah disetujui.

* Melakukan pemotretan kondisi 0% sebelum memulai pekerjaan.


* Pekerjaan urugan pasir untuk menggunakan bahan dan peralatan sesuai deng
kebutuhan yaituh bahan pasir urug dan peralatan skop, pacul dan lain - lain.
* Urugan pasir digunakan untuk urugan dibawah pondasi dengan ketebalan sesu
dengan gambar rencana dan urugan pasir dibawah lantai keramik dengan teb
rata - rata 10 cm, sesuai dengan gambar atau sesuai dengan petunjuk direksi.

* Urugan pasir harus digunakan pasir urug atau sesuai petunjuk Direksi

Urugan Pasir dibawah lantai

Urugan Pasir dibawah pondasi

* Melakukan pemeriksaan secara bersama - sama dengan direksi atas hasil pekerja
sebelum dilakukan opname pekerjaan, mengambil dokumen pekerjaan sebag
bahan laporan.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki akibat : terkena ban truck, scop pada saat penghamparan pasir ur
pada pondasi dan pasir urug dibawah lantai . Luka tangan akibat : terken
tutupan bak dump truck.

* Pengendalian Resiko K3
- Hati - hati dalam menggatur atrekan dump truck jauhkan dari kita ya
menggatur, jangan bercanda pada saat berkerja, mengatur jarak pada sa
penghamparan pasir urug dibawah pondasi maupun dibawah lantai deng
scop. Luka Tangan Hati hati tangan pada saat membuka bak truck di usahak
diperhatikan betul pada saat menutup pintu bak truck.

c. Rencana Waktu Pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan ke I untuk urugan pasir dibaw
pondasi dan minggu ke 1 bulan ke IV untuk pekerjaan urugan pasir dibawah lan
sesuai dengan jadwal pekerjaan.

d. Perhitungan Analisa
* Volume urugan Pasir : -

PEKERJAAN PASANGAN DAN PLESTERAN


4.6 Pas. Batu kosong
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan melampiri gambar kerja (shoop drawin
yang sudah disetujui.
* Melakukan pemotretan kondisi 0% sebelum memulai pekerjaan.
* Pekerjaan batu kosong dilaksanakan dengan menggunakan tenaga manusia, bah
batu kali belah yang bentuk dan ukurannya sesuai dengan petunjuk Direksi Tek
dan digunakan peralatan tukang batu.

* Memasangan Bouplank untuk mengatur penyusunan botu kosong unt


mengetahui ketinggian biasanya 20 cm dan lebar sesuai dengan lebar pondasi ya
tertera dalam bestek atau sesuai petunjuk direksi.

* Dalam penyusunan batu kosong dianjurkan ada selah atau rongga untuk pasir uru
dan dilanjutkan dengan penyiraman untuk menghasilkan ikatan antara batu ya
satu dengan yang lain.

Pasangan Batu Kosong

* Melakukan pemeriksaan secara bersama - sama dengan direksi atas hasil pekerja
sebelum dilakukan opname pekerjaan, mengambil dokumen pekerjaan sebag
bahan laporan.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki akibat : terkena ban truck, terkenah batu kali pada sa
pengangkutan, terkena batu kali pada saat menurunkan batu kali ya
diangkut, terkena batu kali pada saat penyusunan batu . Luka tangan akiba
terkena tutupan bak dump truck, terkena batu kali tusukan batu kali ya
runcung dan terkena tangan pada saat penyusunan batu.

* Pengendalian Resiko K3
- Hati - hati dalam menggatur atrekan dump truck jauhkan dari kita ya
menggatur, jangan bercanda pada saat berkerja, diperhatikan kaki pada sa
mengangkut batu dan pada saat menurunkan batu serta perhatikan kaki pad
saat rekan yang lain mendekatkan batu pada lokasi pekerjaan. Luka Tang
Hati hati tangan pada saat membuka bak truck di usahakan diperhatikan be
pada saat menutup pintu bak truck, diperhatikan tangan pada saat pengangk
batu, menurunkan batu serta pada saat menyusun batu.

c. Rencana Waktu Pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan I sesuai dengan jadwal pekerjaan.

d. Perhitungan Analisa
* Volume Pas. Batu Kosong : 0.12
4.7 Pasangan Batu Kali 1 Pc : 5 Psr
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.

* Setting elevasi dan memasang profil / bouwplank sesuai dengan dimensi renca
dengan tenaga pekerja dan tukang batu.
* Menyiapkan bahan untuk pekerjaan pasangan batu diantaranya : Batu kali ala
pasir, semen, kotak takaran dan kotak untuk campuran 1Pc : 5Ps manual dan
untuk memenuhi kebutuhan air menggunakan pompa air.

* Melaksanakan pekerjaan pasangan batu yang dimulai dari pondasi/koper


bergerak ke arah atas yaitu lantai dan dinding.

Pasangan Pondasi Batu Kali 1Pc : 5Psr

* Melanjutkan dengan pekerjaan plesteran/siaran sebelum mortal pasangan ba


terlalu kering/setengah basah.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pasangan batu kali 1Pc : 5Psr yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki akibat : terkena ban truck, terkenah batu kali pada sa
pengangkutan, terkena batu kali pada saat menurunkan batu kali ya
diangkut, terkena scop atau pacul peralatan pencampuran spesi, terkena ba
kali pada saat penyusunan batu . Luka tangan akibat : terkena tutupan b
dump truck, terkena batu kali tusukan batu kali yang runcung dan terke
tangan pada saat penyusunan batu untuk pasangan batu kali.

* Pengendalian Resiko K3
- Hati - hati dalam menggatur atrekan dump truck jauhkan dari kita ya
menggatur, jangan bercanda pada saat berkerja, diperhatikan kaki pada sa
mengaduk spesi, diperhatikan kaki pada saat mengangkut batu dan pada sa
menurunkan batu serta perhatikan kaki padaa saat rekan yang l
mendekatkan batu pada lokasi pekerjaan. Luka Tangan Hati hati tangan pa
saat membuka bak truck di usahakan diperhatikan betul pada saat menut
pintu bak truck, diperhatikan tangan pada saat pengangkat batu, menurunk
batu serta pada saat menyusun batu untuk pasangan batu kali.

c. Rencana Waktu Pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 3 sampai minggu ke 4 bulan I sesu
dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Pas. Batu Kali 1:5 : 0.19

4.8 Pasangan Bata Merah tebal 1/2 Bata, 1Pc : 5Ps


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan pasangan bata 1Pc : 5Psr di antaranya : Ba
pasir, semen, air, kotak takaran, dan kotak untuk campuran.

Setting elevasi dan memasang profil / bouwplank sesuai dengan dimensi renca
diusahan tidak terlalu tinggi untuk dapat memantau kelurusan pasangan ba
maksimal satu meter untuk jarak benang.

* Menyiram / membasahi bata terlebih dahulu yang akan dipasang guna menjam
ikatan yang baik untuk pasangan bata.

* Memulai pasangan bata sesuai petunjuk direksi.


* Memulai pasangan bata dengan menggunakan pekerja dan tukang batu deng
tinggi pasangan dinding 1/2 bata 4 m dilaksanakan setelah pemasangan trasra
bata atau sesuai petunjuk direksi.

Pasangan 1/2 bata dengan campura


1Pc : 5Ps untuk trasram bata harus
sesuai dengan gambar di depan
dengan penyusunan sesuai dengan
gambar di samping.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan dinding 1/2 bata 1Pc : 5P
yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.
Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan dinding 1/2 bata 1Pc : 5P
yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan kepala akibat : terkena ban dump truck, tertimpah batu ba
pada saat pembawa batu bata . Luka tangan akibat : terkena jepitan batu ba
pada saat penurunan dan penyusunan batu bata.

* Pengendalian Resiko K3
- Hati - hati dalam menggatur atrekan dump truck jauhkan dari kita ya
menggatur, pada saat memberi batu bata pada tukang batu oleh pekerja har
diperhatikan betul dan jangan bercanda pada saat berkerja. Luka Tangan H
hati tangan hati - hati pada saat pengkatan, penurunan serta penyusun
bata agar menjauhan tangan setelah mengangkat dan menyusun batu ba
memakai stegel yang koko untuk pemasangan bata yang lebih tinggi.

C. Rencana waktu pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 3 bulan II sesuai dengan jadwal pekerjaa

d. Perhitungan analisa
* Volume Pas. Dinding Bata 1:5 : 122.05

4.9 Plesteran 1Pc : 5Ps, tebal 15 mm


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan plesteran dinding 1Pc : 5Psr tebal 15 mm, unt
plesteran dinding bata di antaranya : pasir, semen, air, kotak takaran, dan kot
untuk campuran.

* Menyiram / membasahi dinding bata terlebih dahulu yang akan diplester gu


menjamin ikatan yang baik.

* Memulai plesteran sesuai petunjuk direksi.


* Memulai plesteran dari dinding bata yang paling bawah menuju keatas deng
ketebalan 15 cm.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan kepala akibat : terkena ban dump truck yang membawah pa
luka kepala akibat tertimpah spesi atau kota spesi.
* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam menggatur atrekan dump truck jauhkan dari k
yang menggatur, jangan bercanda atau main - main pada saat berker
Kepalah : memakai helm kerja.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 1 bulan III sesuai dengan jadwal pekerjaa

d. Perhitungan analisa
* Volume Plesteran Dinding Bata 1Pc : 5Psr : 354.27

4.10 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan plesteran beton 1Pc : 3Psr tebal 15 mm, unt
beton kolom dan beton balok di antaranya : pasir, semen, air, kotak takaran, d
kotak untuk campuran.

* Menyiram / membasahi beton terlebih dahulu yang akan diplester guna menjam
ikatan yang baik.

* Memulai plesteran sesuai petunjuk direksi.


* Memulai plesteran dari beton yang paling bawah menuju keatas dengan ketebal
15 cm.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan kepala akibat : terkena ban dump truck yang membawah pa
luka kepala akibat terjatuh dari atas pada saat plesteran dinding yang tinggi.

* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam menggatur atrekan dump truck jauhkan dari k
yang menggatur, jangan bercanda atau main - main pada saat berker
Kepalah : memakai helm kerja.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 1 bulan III sesuai dengan jadwal pekerjaa

d. Perhitungan analisa
* Volume Plesteran Beton 1PC : 3Psr : Err:509

4.11 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan acian , untuk di antaranya : semen, air, kot
takaran, dan kotak untuk campuran dilaksanakan setelah selesai pekerja
plesteran.

* Campuran acian harus benar benar kental untuk menjamin ikatan antara acian d
plesteran.

* Memulai acian sesuai petunjuk direksi.


* Memulai acian dinding yang paling bawah menuju keatas dengan ketebalan sesu
dengan petunjuk direksi..
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan kepala akibat : terkena ban dump truck yang membawah pa
luka kepala akibat terjatuh dari atas pada saat plesteran dinding yang tinggi.

* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam menggatur atrekan dump truck jauhkan dari k
yang menggatur, jangan bercanda atau main - main pada saat berker
Kepalah : memakai helm kerja.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 1 bulan III sesuai dengan jadwal pekerjaa

d. Perhitungan analisa
* Volume Acian : Err:509

PEKERJAAN BETON
4.12 Pekerjaan Sloof Uk. 15/20
Pembesian
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan pembesia dengan menggunakan besi po
sesuai dimensi yang tertera pada bestek serta menyiapkan peralatan pemoto
besi dan pembekok besi.

* Pekerjaan pembesian ini menyangkut pembesian untuk beton sloof 15/20 cm ya


dirakit sesuai ukuran tercantum dalam bestek atau sesuai petunjuk direksi.
* memotong besi dengan peralatan pemotong besi sesuai dengan ukuran ya
tertera dalam bestek atau sesuai petunjuk direksi serta besi yang dipakai besi po
yang memiliki standar SNI.

* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
Pembesian Sloof :

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.

* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan pembesian Beton Sloof ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Pembesian Beton sloof diatas dilaksanakan pada minggu ke 4 bulan k
sesuai dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Pembesian Beton Sloof 15/20 cm : 132.00

Pasang Bekisting untuk Sloof ( Asumsi 3 Kali Pemakaian)


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Menyiapkan bahan untuk pekerjaan Begesting untuk sloof di antaranya : pap
kayu klas III, paku dan Teak oil dan menggunakan peralatan tukang kayu.
* Membuat kerangka begesting untuk tempat pengecoran beton sesuai deng
ukuran beton yang dicor.

Begesting Sloof

 

 

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting sloof yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Begesting Sloof ini dilaksanakan pada minggu ke 1 bulan II sesuai deng
jadwal pekerjaan.

d. Perhitungan analisa
* Volume Begesting Sloof : -

Beton K 175
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton Sloof mutu k 175 dengan ukuran 15/
cm , di antaranya : semen, pasir beton,Kerikir , air, kotak takaran, dan kotak unt
campuran menggunakan peralatan Concreter Mixer, serta menggunakan tena
tukang batu.

* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata, pekerjaan ini dilakukan sesuda pemasangan pond
batu kali.
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata, pekerjaan ini dilakukan sesuda pemasangan pond
batu kali.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena karet concreter mixer, akibat terjepit me


concreter mixer pada saat memasukan bahan adukan dan terjatu pada sa
plesteran. dan terkena palu pada saat memaku.

* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan memakai sepatu kerja dan helm kerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan beton sloof yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Beton sloof ini dilaksanakan pada minggu ke 1 bulan ke II sesuai deng
jadwal pekerjaan.

d. Perhitungan analisa
* Volume Beton Sloof : -

4.13 Pekerjaan Kolom Teras Uk. 20/20


Pembesian Kolom 40/40 cm
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan pembesia dengan menggunakan besi po
sesuai dimensi yang tertera pada bestek serta menyiapkan peralatan pemoto
besi dan pembekok besi.

* Pekerjaan pembesian ini menyangkut pembesian untuk beton kolom 40/40 cm ya


dirakit sesuai ukuran tercantum dalam bestek atau sesuai petunjuk direksi.

* memotong besi dengan peralatan pemotong besi sesuai dengan ukuran ya


tertera dalam bestek atau sesuai petunjuk direksi serta besi yang dipakai besi po
yang memiliki standar SNI.

Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
Pembesian Kolom 40/40 cm :
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan pembesian Beton kolom 40/
cm yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Pembesian Beton kolom 40/40 cm diatas dilaksanakan pada minggu ke
bulan ke II sesuai dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Pembesian Beton kolom 40/40 cm : -

Pasang Bekisting untuk Kolom ( Asumsi 3 Kali Pemakaian)


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Menyiapkan bahan untuk pekerjaan Begesting untuk kolom 40/40 cm di antarany
papan kayu klas III, paku dan Teak oil dan menggunakan peralatan tukang kayu.

* Membuat kerangka begesting untuk tempat pengecoran beton sesuai deng


ukuran beton yang dicor.

Begesting Kolom 40/40 cm


 
 
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku, memakai kaos tangan kerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting Kolom 40/40 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Begesting Kolom 40/40 cm ini dilaksanakan pada minggu ke 2 bulan II sesu
dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Begesting Kolom 40/40 cm : -

Beton K175
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton Kolom , mutu K 175 dengan ukuran 40/
cm , di antaranya : semen, pasir beton,Kerikir , air, kotak takaran, dan kotak unt
campuran menggunakan peralatan Concreter Mixer, serta menggunakan tena
tukang batu. beton kolom 40/.40 untuk Kolom Emperan.

* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata, pekerjaan ini dilakukan sesuda pemasangan pond
batu kali.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena karet concreter mixer, akibat terjepit me


concreter mixer pada saat memasukan bahan adukan dan terjatu pada sa
plesteran. dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan memakai sepatu kerja dan helm kerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan beton kolom 40/40 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Beton Kolom 40/40 cm ini dilaksanakan pada minggu ke 2 bulan ke II sesu
dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Beton Kolom 40/40 cm : 0.11

4.14 Pekerjaan Kolom Uk. 25/25


Pembesian Kolom 20/20 cm
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan pembesia dengan menggunakan besi po
sesuai dimensi yang tertera pada bestek serta menyiapkan peralatan pemoto
besi dan pembekok besi.

* Pekerjaan pembesian ini menyangkut pembesian untuk beton kolom 20/20 cm ya


dirakit sesuai ukuran tercantum dalam bestek atau sesuai petunjuk direksi.

* memotong besi dengan peralatan pemotong besi sesuai dengan ukuran ya


tertera dalam bestek atau sesuai petunjuk direksi serta besi yang dipakai besi po
yang memiliki standar SNI.

* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
Pembesian Kolom 20/20 cm :
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan pembesian Beton kolom 20/
cm yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Pembesian Beton kolom 20/20 cm diatas dilaksanakan pada minggu ke
bulan ke II sesuai dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Pembesian Beton kolom 20/20 cm : 156.27

Pasang Bekisting untuk Kolom ( Asumsi 3 Kali Pemakaian)


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Menyiapkan bahan untuk pekerjaan Begesting untuk kolom 20/20 cm di antarany
papan kayu klas III, paku dan Teak oil dan menggunakan peralatan tukang kayu.

* Membuat kerangka begesting untuk tempat pengecoran beton sesuai deng


ukuran beton yang dicor.

Begesting Kolom 20/20 cm



b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku, memakai kaos tangan kerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting Kolom 20/20 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Begesting Kolom 20/20 cm ini dilaksanakan pada minggu ke 2 bulan II sesu
dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Begesting Kolom 20/20 cm : 0.09

Beton K175
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton Kolom , mutu K 175 dengan ukuran 20/
cm , di antaranya : semen, pasir beton,Kerikir , air, kotak takaran, dan kotak unt
campuran menggunakan peralatan Concreter Mixer, serta menggunakan tena
tukang batu. beton kolom 20/.20 untuk Kolom induk bangunan.

* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata, pekerjaan ini dilakukan sesuda pemasangan pond
batu kali.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena karet concreter mixer, akibat terjepit me


concreter mixer pada saat memasukan bahan adukan dan terjatu pada sa
plesteran. dan terkena palu pada saat memaku.

* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan memakai sepatu kerja dan helm kerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan beton kolom 20/20 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.
Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan beton kolom 20/20 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Beton Kolom 20/20 cm ini dilaksanakan pada minggu ke 2 bulan ke II sesu
dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Beton Kolom 20/20 cm : -

4.15 Pekerjaan Beton Gewel


Pembesian Kolom 13/13 cm
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan pembesia dengan menggunakan besi po
sesuai dimensi yang tertera pada bestek serta menyiapkan peralatan pemoto
besi dan pembekok besi.

* Pekerjaan pembesian ini menyangkut pembesian untuk beton kolom 13/13 cm ya


dirakit sesuai ukuran tercantum dalam bestek atau sesuai petunjuk direksi.

* memotong besi dengan peralatan pemotong besi sesuai dengan ukuran ya


tertera dalam bestek atau sesuai petunjuk direksi serta besi yang dipakai besi po
yang memiliki standar SNI.

* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
Pembesian Kolom 13/13 cm :

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan pembesian Beton kolom 13/
cm yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.

Begesting Kolom 13/13 cm


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Menyiapkan bahan untuk pekerjaan Begesting untuk kolom 13/13 cm di antarany
papan kayu klas III, paku dan Teak oil dan menggunakan peralatan tukang kayu.

* Membuat kerangka begesting untuk tempat pengecoran beton sesuai deng


ukuran beton yang dicor.
Begesting Kolom 13/13 cm




b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku, memakai kaos tangan kerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting Kolom 13/13 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.

Pekerjaan Beton Gewel


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton Kolom , mutu K 175 dengan ukuran 13/
cm , di antaranya : semen, pasir beton,Kerikir , air, kotak takaran, dan kotak unt
campuran menggunakan peralatan Concreter Mixer, serta menggunakan tena
tukang batu. beton kolom 13/.13 untuk Kolom induk bangunan.

* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata, pekerjaan ini dilakukan sesuda pemasangan pond
batu kali.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena karet concreter mixer, akibat terjepit me


concreter mixer pada saat memasukan bahan adukan dan terjatu pada sa
plesteran. dan terkena palu pada saat memaku.

* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan memakai sepatu kerja dan helm kerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan beton kolom 13/13 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Beton Kolom 13/13 cm ini dilaksanakan pada minggu ke 2 bulan ke II sesu
dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Beton Kolom 13/13 cm : -

4.16 Err:509
Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan pembesia dengan menggunakan besi po
sesuai dimensi yang tertera pada bestek serta menyiapkan peralatan pemoto
besi dan pembekok besi.
Menyiapkan bahan untuk pekerjaan pembesia dengan menggunakan besi po
sesuai dimensi yang tertera pada bestek serta menyiapkan peralatan pemoto
besi dan pembekok besi.

* Pekerjaan pembesian ini menyangkut pembesian untuk beton balok 15/25 unt
balok gantung yang dirakit sesuai ukuran tercantum dalam bestek atau sesu
petunjuk direksi.

* memotong besi dengan peralatan pemotong besi sesuai dengan ukuran ya


tertera dalam bestek atau sesuai petunjuk direksi serta besi yang dipakai besi po
yang memiliki standar SNI.

* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.

c. Rencana waktu pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Besi Balok beton 15/25 cm ini dilaksanakan pada minggu ke 3 bulan ke
sesuai dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Balok Beton 15/25 cm : Err:509

Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Menyiapkan bahan untuk pekerjaan Begesting untuk balok 15/25 di antaranya
papan kayu klas III, paku dan Teak oil dan menggunakan peralatan tukang kayu.
* Membuat kerangka begesting untuk tempat pengecoran beton sesuai deng
ukuran beton yang dicor.

Begesting Balok 15/25 cm

 

b. Pengendalian Resiko
 K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting balok 15/25 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.

c. Rencana waktu pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Begesting Balok 15/25 cm ini dilaksanakan pada minggu ke 4 bulan ke
sesuai dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Begesting Balok 15/25 cm : Err:509

Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton balok K.175, di antaranya : semen, pa
beton,Kerikir , air, kotak takaran, dan kotak untuk campuran menggunak
peralatan Concreter Mixer, serta menggunakan tenaga tukang batu.

* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena karet concreter mixer, akibat terjepit me


concreter mixer pada saat memasukan bahan adukan dan terjatu pada sa
plesteran. dan terkena palu pada saat memaku.

* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan membuat stager yang kokoh agar tidak mud
roboh.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan beton balok 15/25 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.
Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan beton balok 15/25 cm ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Beton balok 15/25 cm ini dilaksanakan pada minggu ke 4 bulan ke II sesu
dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Beton Balok 15/25 cm : Err:509

4.17 Pekerjaan Ring Balok Uk. 11/15


Pembesian Ring Balok
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan pembesia dengan menggunakan besi po
sesuai dimensi yang tertera pada bestek serta menyiapkan peralatan pemoto
besi dan pembekok besi.

* Pekerjaan pembesian ini menyangkut pembesian untuk beton ring Balok ya


dirakit sesuai ukuran tercantum dalam bestek atau sesuai petunjuk direksi.

* memotong besi dengan peralatan pemotong besi sesuai dengan ukuran ya


tertera dalam bestek atau sesuai petunjuk direksi serta besi yang dipakai besi po
yang memiliki standar SNI.

* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.

* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.

Begesting Ring Balok


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Menyiapkan bahan untuk pekerjaan Begesting untuk ring balok di antaranya
papan kayu klas III, paku dan Teak oil dan menggunakan peralatan tukang kayu.
* Membuat kerangka begesting untuk tempat pengecoran beton sesuai deng
ukuran beton yang dicor.

Begesting Ring Balok

 

 

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting Ring Balok ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.

Beton Ring Balok


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton Ring Balok, di antaranya : semen, pa
beton,Kerikir , air, kotak takaran, dan kotak untuk campuran menggunak
peralatan Concreter Mixer, serta menggunakan tenaga tukang batu.

* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena karet concreter mixer, akibat terjepit me


concreter mixer pada saat memasukan bahan adukan dan terjatu pada sa
plesteran. dan terkena palu pada saat memaku.

* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan membuat stager yang kokoh agar tidak mud
roboh.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan beton ring Balok yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Beton ring Balok ini dilaksanakan pada minggu ke 4 bulan ke II sesuai deng
jadwal pekerjaan.

d. Perhitungan analisa
* Volume Beton Ring Balok : 0.48

4.18 Err:509
Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan untuk pekerjaan pembesia dengan menggunakan besi po
sesuai dimensi yang tertera pada bestek serta menyiapkan peralatan pemoto
besi dan pembekok besi.

* Pekerjaan pembesian ini menyangkut pembesian untuk beton plat dak yang dirak
sesuai ukuran tercantum dalam bestek, ketebalan yang tertera dalam bestek at
sesuai petunjuk direksi.
Pekerjaan pembesian ini menyangkut pembesian untuk beton plat dak yang dirak
sesuai ukuran tercantum dalam bestek, ketebalan yang tertera dalam bestek at
sesuai petunjuk direksi.

* memotong besi dengan peralatan pemotong besi sesuai dengan ukuran ya


tertera dalam bestek atau sesuai petunjuk direksi serta besi yang dipakai besi po
yang memiliki standar SNI.

* Mengikat besi polos dengan kawat ikat sesuai dengan ukuran dan bentuk ya
tercamtum dalam bestek sesuai petunjuk direksi.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena tusukan besi, memotong besi, menganyam besi.
* Pengendalian Resiko K3
- Hati - hati dalam mengangkat besi yang dipotong, jagan bercanda dala
berkerja, memakai mesin pemotong besi dan hati - hati dalam mengikat b
jauhkan tangan dari alat pengikat serta diusahakan menggunakan alat khus
untuk menganyam besi, memakai kaos tangan kerja.

c. Rencana waktu pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Pembesian Plat Dak ini dilaksanakan pada minggu ke 3 bulan ke II sesu
dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Pembesian Plat Dak : Err:509

Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Menyiapkan bahan untuk pekerjaan Begesting untuk plat dak di antaranya : pap
kayu klas III, balok kayu, paku, Teak oil dan kayu Dolken sebagai perancang se
menggunakan peralatan tukang kayu.

* Membuat kerangka begesting untuk tempat pengecoran beton sesuai deng


ukuran beton yang dicor.

Begesting Plat Dak




b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena gergaji dan terkena palu pada saat memaku.
* Pengendalian Resiko K3
- Hati - hati dalam mengergaji kayu begesting, jangan bercanda saat berke
dan hati-hati pada saat memaku.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Begesting plat dak yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.

c. Rencana waktu pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Begesting plat dak ini dilaksanakan pada minggu ke 4 bulan ke II sesu
dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Begesting Plat Dak : Err:509

Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton plat dak K.175, di antaranya : seme
pasir beton,Kerikir , air, kotak takaran, dan kotak untuk campuran menggunak
peralatan Concreter Mixer, serta menggunakan tenaga tukang batu.

* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata.

* Setelah campuran beton merata maka dilanjutkan dengan pengangkutan campur


beton kelokasi plat dak yang akan dicor dengan cara menuangkan diatas ayam
besi plat yang di bungkus dengan begesting.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena karet concreter mixer, akibat terjepit me


concreter mixer pada saat memasukan bahan adukan dan terjatu pada sa
plesteran. dan terkena palu pada saat memaku.

* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer dan membuat stager yang kokoh agar tidak mud
roboh.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan beton plat dak yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Beton plat dak ini dilaksanakan pada minggu ke 4 bulan ke II sesuai deng
jadwal pekerjaan.

d. Perhitungan analisa
* Volume Beton Plat Dak : Err:509

4.19 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pekerjaan Beton Tumbuk K.100, di antaranya : seme
pasir beton,Kerikir , air, kotak takaran, dan kotak untuk campuran menggunak
peralatan Concreter Mixer, serta menggunakan tenaga tukang batu.

* Pekerjaan lantai beton yang dimaksud disini untuk lantai kerja sebelu
pemasangan lantai keramik jadi lantai harus di cor duluh dengan lantai kerja bet
K. 100 dan dilanjutkan dengan pemasangan keramik.

* Menyiram / membasahi Koral sampai bersih terlebih dahulu yang akan dicamp
guna menjamin ikatan yang baik.
* Menyiapkan peralatan untuk menyampur semen, pasir dan kerikir serta
secukupnya dengan perbandingan campuran 1 Pc : 2Psr : 3Krl, pada sa
pencampuran dengan menggunakan alat beton molen untuk menghasilk
campuran beton yang rata.

* Setelah campuran beton merata maka dilanjutkan dengan pengangkutan campur


beton kelokasi pengecoran yang akan dicor dengan cara menuangkan dia
permukaan ruangan yang sudah diurug dengan pasir.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka tangan akibat terkena karet concreter mixer, akibat terjepit me


concreter mixer pada saat memasukan bahan adukan dan terjatu pada sa
plesteran. dan terkena palu pada saat memaku.

* Pengendalian Resiko K3
- Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer, memakai sepatu kerja, kaos tangan kerja.
Hati - hati dalam menghidupkan mesin Concreter Mixer, jangan bercanda sa
berkerja, memperhatikan tangan pada saat memasukan bahan adukan pa
mesin concreter mixer, memakai sepatu kerja, kaos tangan kerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan beton lantai kerja yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Beton Lantai Kerja ini dilaksanakan pada minggu ke 1 bulan ke IV sesu
dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Beton Lantai Kerja : Err:509

PEKERJAAN KUSEN
4.20 Kusen Pintu dan Jendelah Kayu Klas I

a. Urutan cara pelaksanaan


* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan pembuatan untuk pekerjaan kusen pintu, kusen jendela d
ventilasi alumenium adalah Sealent, Semen atau mortal, fischer, sekrup, isol
plastik atau kertas dan alumenium kusen yang sudah dirangkai sesuai ukuran kus
jendelah dan pintu.

* Menyiapkan peralatan pemasangan kusen alumenium adalah obeng, bor temb


dan baji kayu atau karet dibantu dengan tenaga tukang besi.

* Pada saat pemasangan dinding maka harus dipersiapkan lubang kusen agar tid
perlu melakukan pembongkaran, ukuran lubang disesuaikan dengan ukuran kus
ditambah 1 cm untuk tempat sealent.

* Lalu kita masukan kusen kedalam lubang, mengatur agar posisinya pas deng
menggunakan alat beji, setelah posisi pas maka kita stel kelurusan kusen deng
dinding, ketegakan dan kedataran sampai benar-benar bagus.

* Kita buat lubang untuk tempat sekrup pada dinding melalui lubang kusen deng
menggunakan alat bor, kenmudian kita masukan fischer kedalam lubang bor ya
telah kita buat lalu kita ambil obeng untuk mengencangkan fischer.

* Selama prosess pembangunan berlangsung maka rawan terjadi goresan at


benturan sehingga terjadi kerusakan kusen. Oleh karna itu kita buat pelindu
dengan bahan isolasi plastik atau kertas.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki akibat : tertimpah alumenium pada saat mengangkat alumeniu


Tangan akibat : terkena alat pemotong alumenium, goresan tangan karna ke
obeng pada saat pemasangan sekrup..

* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam mengangkat alumenium, memakai sepatu ke
dan jangan bercanda atau main - main pada saat berkerja, luka tangan
memakai kaos tangan kerj.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan Kusen Pintu, kusen jendela d
ventilasi Alumenium yang sudah dikerjakan dan memperbaiki kembali pekerja
yang kurang memuaskan sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 1 bulan IV sesuai dengan jadwal pekerjaa

d. Perhitungan analisa
* Volume Kusen pintu, Kusen Jendela & Ventilasi Alumenium : 0.88

4.21 Memasang Daun Pintu Panil


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan pembuatan untuk pekerjaan daun pintu, daun jendela d
ventilasi alumenium adalah Sealent, Semen atau mortal, fischer, sekrup, isol
plastik atau kertas, kaca polos 5 mm dan alumenium yang sudah dirangkai sesu
ukuran daun jendelah dan pintu.

* Menyiapkan peralatan pemasangan kusen daun pintu dan daun jendel


alumenium adalah obeng, bor tembok dan baji kayu atau karet dibantu deng
tenaga tukang besi.

* Pada saat pemasangan dinding maka harus dipersiapkan lubang kusen agar tid
perlu melakukan pembongkaran, ukuran lubang disesuaikan dengan ukuran kus
ditambah 1 cm untuk tempat sealent.

* Lalu kita masukan kusen kedalam lubang, mengatur agar posisinya pas deng
menggunakan alat beji, setelah posisi pas maka kita stel kelurusan daun pintu d
daun jendela dengan dinding, ketegakan dan kedataran sampai benar-benar bagu

* Kita buat lubang untuk tempat sekrup pada dinding melalui lubang kusen deng
menggunakan alat bor, kenmudian kita masukan fischer kedalam lubang bor ya
telah kita buat lalu kita ambil obeng untuk mengencangkan fischer.

* Kita siapkan daun pintu atau daun jendela yang sudah dirangkai penuh, misaln
sudah terpasang kaca dengan sempurna.

* Daun pintu atau daun jendela kita masuk kelubang kusen kemudian kita pasa
semua aksesories seperti engsel, roda, rel, handlel, door dan lainnya.

* Kemudian kita lakukan finishing tembok dengan menggunakan bahan mort


semen dan seanlent, pengisian dilakukan sampai tertutup semua celah anta
dinding dan kusen.

* Selama prosess pembangunan berlangsung maka rawan terjadi goresan at


benturan sehingga terjadi kerusakan kusen. Oleh karna itu kita buat pelindu
dengan bahan isolasi plastik atau kertas.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki akibat : tertimpah alumenium pada saat mengangkat alumeniu


Tangan akibat : terkena alat pemotong alumenium dan kaca polos, gores
tangan karna kena obeng pada saat pemasangan sekrup..

* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam mengangkat alumenium, memakai sepatu ke
dan jangan bercanda atau main - main pada saat berkerja, luka tangan
memakai kaos tangan kerj.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume Pekerjaan Daun Pintu dan daun Jendel
jendela Alumenium yang sudah dikerjakan dan memperbaiki kembali pekerja
yang kurang memuaskan sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 1 bulan IV sesuai dengan jadwal pekerjaa

d. Perhitungan analisa
* Volume Daun Pintu dan Daun Jendelah : 6.40

4.22 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.

* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.


* Menyiapkan bahan pembuatan sun blant serta peralatan.
* Melakukan pemasangan sun blant harus sesuai dengan bestek dan atas petun
direksi.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- Luka kaki akibat : tertimpah sun blant serta luka tangan pada sa
pemotongan sun blant..
* Pengendalian Resiko K3
- Memakai sepatu kerja dan kaos tangan kerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume Pekerjaan Sun Blant yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 1 bulan IV sesuai dengan jadwal pekerjaa

d. Perhitungan analisa
* Volume Sun Blant : Err:509

PEKERJAAN PLAFOND
4.23 Memasang Langit - Langit Tripleks ( 120 x 240 ) cm, Tebal 3 mm
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan bahan untuk pemasangan rangka plafoond dan plafoond tripleks ya
rangka plafoond menggunakan kayu Kls II 5/7 cm untuk balok induk dan 4/6
untuk balok pembagi, plafoond tripleks 3 mm, paku dan peralatan tukang ka
serta benang .

* Pertama tama kita harus membersihkan peralatan disekitar pemasangan plafoond


agar muda dalam pekerjaan pemasangan plafoond.
* memotong kayu 5/7 cm sebagai balok induk dan 4/6 cm sebagai balok pembagi
sesuai dengan ukuran yang tertera pada bestek atau petunjuk direksi.
* Merangkai rangka plafoond dengan ukuran sesuai dengan bestek atau sesu
petunjuk direksi dan tidak lupa pada saat pemasangan rangka harus bisa menguk
kedataran rangka plafoond dengan water pass.

* memasang gantung plafoond dengan kayu sekuat mungkin kalau perlu diadak
pengetesan untuk mengetahui kekuatan gantungan plafoond karna dia sebag
penahan beban plafoond keseluruhan.

* Setelah gantung plafoond selesai dan diangap kuat untuk pemasangan plafoo
maka dilanjutkan dengan pemotong tripleks 3 mm dengan ukuran sesuai bes
rangka plafoond dan diusahan pada saat pemasangan rangka maupun triple
harus memakai steger agar muda dalam pelaksanannya.
* Pemasangan tripleks harus dibarengi dengan pengukuran water pass unt
mengetahui kedataran pemasangan dan batas batas pemasangan rangka maup
plafoond harus dibatasi dengan benang pembatas.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat :terjatu dari atap pada saat pemasang
plafoond. Luka Tangan : terkena gergaji pemotong kayu maupun tripleksd
terkena palu pada saat pemasangan plafoond.

* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati - hati terjatu dalam memasangan plafoon
memakai steger, helm kerja . Luka tangan : hati - hati dalam memotong ka
maupun tripleks, memakai kaos tangan kerjan dan jangan bercanda atau ma
- main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan Pemasangan plafoond triplek
mm yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan III sesuai dengan jadwal pekerjaa

d. Perhitungan analisa
* Volume Plafoond Tripleks 3 mm : 261.00

4.24 List Plafond


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan list profil kayu yang terdapat pada toko bangunan atau distributor
plafoond, paku serta peralatan tukang kayu.
* Pertama tama kita harus membersihkan peralatan disekitar pemasangan plafoond
agar muda dalam pekerjaan pemasangan plafoond.
* Mengukur panjang sisi dalam dari bangunan untuk pemasangan list serta
menyambung list plafoond dengan paku serta mengikat lis plafoond dengan
plafoond.
Mengukur panjang sisi dalam dari bangunan untuk pemasangan list serta
menyambung list plafoond dengan paku serta mengikat lis plafoond dengan
plafoond.

* Pada saat pemasangan list plafoond harus diperhatikan kelurusan pemasangan


plafoond serta sambungan list plafoond diusahakan tidak kelihatan.
* Pada saat pemasangan list plafoond harus memakai stager sebagai tang
penghubung.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat :terjatu dari atap pada saat pemasangan
plafoond. Luka Tangan : terkena gergaji pemotong list plafoond maup
terkena palu pada saat pemasangan list plafoond.

* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati - hati terjatu dalam memasangan list plafoon
memakai steger, helm kerja . Luka tangan : hati - hati dalam memotong
plafoond, memakai kaos tangan kerjan dan jangan bercanda atau main - m
pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan Pemasangan List plafoond ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan III sesuai dengan jadwal pekerjaa

d. Perhitungan analisa
* Volume List Plafoond : 130.00

PEKERJAAN LANTAI
4.25 Pasang Lantai Keramik 30 x 30 Cm
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pemasangan keramik yaitu peralatan tukang batu, alat pemoto
keramik dan lain-lain.
* Mengunakan bahan keramik yang berukuran 40 x 40 cm polos , semen, sem
warna, pasir, dengan kualitas baik .
* Memulai pekerjaan pemasangan keramik 40 x 40 cm harus sesuai petunjuk direk
* Permukaan Lantai yang dipakai untuk pemasangan lantai keramik harus be
cukup kering dan rata air.
* Sebelum dipasang keramik agar direndam pakai air agar mudah merekat deng
spesi.
* Setiap jalur untuk pemasangan keramik lantai ditarik benang rata air.
* Adukan spesi untuk pemasangan keramik harus penuh baik permukaan das
maupun belakang keramik lantai dengan ketebalan spesi rata - rata 2 sampai 4 cm

* Lebar nat yang dianjurkan untuk yaitu antara 4 sampai 5 mm dari campuran sem
atau bahan lain yang dianjurkan oleh pihak direksi.
* membersihakan spasi yang nempel dipermukaan lantai yang sudah terpasa
dengan air. Dari gambar dibawah yang dipasang keramik 40/40 cm yang tidak ar
hitam.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki akibat : tertimpah keramik lantai pada saat mengambil keram
Tangan akibat : terjepit pemotong keramik dan kena palu jari pada sa
memadatkan pasangan keramik lantai.

* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam mengangkat keramik diusahan diangkat sa
persatu, memakai sepatu kerja. Luka tangan : hati - hati dalam memoto
keramik dan memadatkan keramik dengan palu atau alat pemukul keram
agar padat dan berisi diusahakan memperhatikan tangan, memakai ka
tangan kerja dan jangan bercanda atau main - main pada saat berkerja.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan keramik 40 x
Cm yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.
Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan keramik 40 x
Cm yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

c. Rencana waktu pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Keramik lantai 40 x 40 cm rencanakan dilaksanakan pada minggu ke 1 bul
IV sesuai dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Keramik 40 x 40 cm : 104.40

4.26 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pemasangan lantai keramik KM/WC yaitu peralatan Tukang Ba
dan Peralatan Pemotong keramik lantai.
* Mengunakan keramik yang berukuran 20 x 20 cm yang bermotif dengan kualitas
yang baik .
* Memulai pekerjaan pemasangan keramik 20 x 20 cm untuk lantai KM/WC haru
sesuai petunjuk direksi.
* Sebelum dipasang keramik agar direndam pakai air agar mudah merekat deng
spesi.
* Setiap jalur untuk pemasangan keramik lantai ditarik benang rata air.
* Adukan spesi untuk pemasangan keramik harus penuh baik permukaan das
maupun belakang keramik lantai dengan ketebalan spesi rata - rata 2 sampai 4 cm

* Lebar nat yang dianjurkan untuk yaitu antara 4 sampai 5 mm dari campuran sem
atau bahan lain yang dianjurkan oleh pihak direksi.
* membersihakan spasi yang nempel dipermukaan lantai yang sudah terpasa
dengan air. Yang kamar mandi dan WC yang diwarnai dengan hitam itu ya
dipasang keramik lantai 20/20 cm.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki akibat : tertimpah keramik lantai pada saat mengambil keram
Tangan akibat : terjepit pemotong keramik dan kena palu jari pada sa
memadatkan pasangan keramik lantai.

* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam mengangkat keramik diusahan diangkat sa
persatu. Luka tangan : hati - hati dalam memotong keramik dan memadatk
keramik dengan palu atau alat pemukul keramik agar padat dan be
diusahakan memperhatikan tangan, jangan bercanda atau main - main pa
saat berkerja.
* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan lantai keram
KM/WC , 20 x 20 Cm yang sudah dikerjakan dan memperbaiki kembali pekerja
yang kurang memuaskan sampai diterima baik oleh Direksi.

c. Rencana waktu pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini rencanakan dilaksanakan pada minggu ke 1 bulan IV sesuai deng
jadwal pekerjaan.

d. Perhitungan analisa
* Volume Keramik lantai 20 x 20 cm : Err:509

4.27 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pemasangan Dinding keramik yaitu peralatan Tukang Batu d
Peralatan Pemotong keramik dinding.
* Mengunakan keramik yang berukuran 20 x 25 cm yang bermotif dengan kualitas
yang baik .
* Memulai pekerjaan pemasangan keramik 20 x 25 cm untuk dinding KM/WC haru
sesuai petunjuk direksi.
* Sebelum dipasang keramik agar direndam pakai air agar mudah merekat deng
spesi.
* Setiap jalur untuk pemasangan keramik dinding ditarik benang rata.
* Adukan spesi untuk pemasangan keramik harus penuh baik permukaan das
maupun belakang keramik dinding dengan ketebalan spesi rata - rata 2 cm.
* Lebar nat yang dianjurkan untuk yaitu antara 2 mm dari campuran semen at
bahan lain yang dianjurkan oleh pihak direksi.
* Pada saat pemasangan dinding keramik harus diberi
* membersihakan spasi yang nempel dipermukaan lantai yang sudah terpasa
dengan tali air dengan jarak tertentu dengan pertimbangan desain agar tid
menerima beban terlalu berat.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki akibat : tertimpah keramik dinding pada saat mengambil keram
Tangan akibat : terjepit pemotong keramik dan kena palu jari pada sa
memadatkan pasangan keramik dinding.

* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam mengangkat keramik diusahan diangkat sa
persatu. Luka tangan : hati - hati dalam memotong keramik dan memadatk
keramik dengan palu atau alat pemukul keramik agar padat dan be
diusahakan memperhatikan tangan, jangan bercanda atau main - main pa
saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerjaan


sebagai dasar untuk perhitungan volume pekerjaan pemasangan Dinding keramik
KM/ WC , 20 x 25 cm yang sudah dikerjakan dan memperbaiki kembali pekerjaan
yang kurang memuaskan sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Keramik dinding KM/WC , 20 x 25 cm rencanakan dilaksanakan pada ming
ke 1 bulan IV sesuai dengan jadwal pekerjaan.

d. Perhitungan analisa
* Volume Keramik Dinding KM/WC , 20 x 25 cm : Err:509

PEKERJAAN ATAP
4.28 Pasang Rangka Atap Kayu
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat mobilisasi rangka baja dan peralatan pemasangan rangka b
ringan sesuai dengan kebutuhan .
* Baja ringan harus mempunyai berat struktur yang ringan yaituh 9 - 10 Kg/M2
* Memulai pekerjaan kayu Kap Kuda - kuda Klas I harus sesuai petunjuk direksi.
* Tebal Profil C untuk kuda-kuda utama minimal 0,8 mm TCT, tinggi penampang
minimal 75 sedangkan tebal profit untuk reng genteng minimal 5 mmTCT.
* Menggunakan baut penyambung 12-14 x 20 HEX ITW Buildex untuk struktur kud
kuda dan baut 10-16 x HEX untuk reng.
* Menyiapkan gambar shp drawing untuk menyeyesuaikan bentuk kuda- kuda berik
ukurannya, spacing, overhang, jarak reng dan jumlah dan lokasi baut.
* Setiap kuda kuda harus ditandai atau dinomor untuk menghidari kesalah
pemasangan.
* Sebelum pemasangan rangka baja harus diperiksa kembali permukaan ring b
apakah sudah berada dalam satu bidang/lever, jika tidak, harus diberi ganjaran at
dudukan sehingga tidak ada gap antara ring balk dan kuda - kuda. Tidak dianjurk
menggunakan material kayu, balok kayu sebagai bahan ganjaran atau bah
dudukan permanen.

* Kuda-kuda yang sudah dirakit diangkat keatas ring balk secara manual atau deng
alat crane. Untuk menggunakan crane harus di ikat dua titik sebagai titik tum
angkut, kuda-kuda harus diangkat secara hati-hati untuk menghidari dari res
lentur , terbanting atau lepas sambungannya.

* Semua kuda-kuda harus diereksi dalam bidang, vertikal dan sejajar satu sama la
terpasang akurat pada tempatnya sesuai jarak dalam gambar. Setelah kuda-ku
naik keatas dan duduk pada posisinya, harus dipasang/ disediakan braci
sementara untuk mencegah robohnya struktur kuda-kuda.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat :terjatu dari atap pada saat pemasangan rang
baja ringan . Luka Tangan : terkena alat pemotong rangka baja ringgan.

* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati - hati dalam memasangan rangka baja ring
karna baja ringgan mudah patah, memperkuat ikatan antara baja ringan unt
kuda - kuda dan usuk reng. Luka tangan : hati - hati dalam memotong rang
baja ringan dan jangan bercanda atau main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan rangka baja ringa yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan

Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan rangka baja ringan dilaksanakan pada minggu ke 2 bulan III sesuai deng
jadwal pekerjaan.

d. Perhitungan analisa
* Volume Rangka Baja Ringan : 238.99

4.29 Memasang Atap Metal Roof


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pembuatan untuk pekerjaan Atap dipasang mengunakan Gente
Metal Roof peralatan tukang kayu.
* Mengunakan Genteng Metal Roof dengan kualitas yang baik .
* Memulai pekerjaan Atap Genteng Metal Roof harus sesuai petunjuk direksi.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan Pemasangan Atap deng
mengunakan Genteng Metal Roof yang sudah dikerjakan dan memperbaiki kemb
pekerjaan yang kurang memuaskan sampai diterima baik oleh Direksi.
Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan Pemasangan Atap deng
mengunakan Genteng Metal Roof yang sudah dikerjakan dan memperbaiki kemb
pekerjaan yang kurang memuaskan sampai diterima baik oleh Direksi.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat :terjatu dari atap pada saat pemasangan at
genteng metal roof karna licin. Luka Tangan : terkena alat pemotong at
metal roof.

* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati - hati terjatudalam memasangan atap metal ro
karna licin . Luka tangan : hati - hati dalam memotong atap metal roof kar
tajam terkena tangan dan jangan bercanda atau main - main pada sa
berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan Pemasangan Atap deng
mengunakan Genteng Metal Roof yang sudah dikerjakan dan memperbaiki kemb
pekerjaan yang kurang memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Genteng Metal Roof dilaksanakan pada minggu ke 3 bulan III sesuai deng
jadwal pekerjaan.

d. Perhitungan analisa
* Volume Atap Metal Roof : 356.70

4.30 Memasang Bubungan Metal Roof


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pembuatan untuk pekerjaan bubungan mengunakan bubung
metal peralatan tukang kayu.
* Mengunakan bubungan metal yang terdapat pada distributor resmi dengan kualit
yang baik .

Bubungan Multi Roo

* Memulai pekerjaan bubungan metal harus sesuai petunjuk direksi.


Memasang bubungan metal roof dengan menggunakan paku dan anta
sambungan bubungan harus saling menutupi satu dengan yang lain.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat :terjatu dari atap pada saat pemasang
bubungan genteng metal roof karna licin. Luka Tangan : terkena alat pemoto
dan menyambung bubungan metal roof.

* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati - hati terjatu dalam memasangan bubung
metal roof karna licin . Luka tangan : hati - hati dalam memotong d
menyambung bubungan metal roof karna tajam terkena tangan dan jang
bercanda atau main main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan Pemasangan bubungan me
roof dengan mengunakan bubungan metal yang sudah dikerjakan dan memperba
kembali pekerjaan yang kurang memuaskan sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 3 bulan III sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume bubungan genten metal roof : 30.50

4.31 Lisplang ( 3 x 20 ) cm, Kayu Klas II


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.

* Menyiapkan alat pembuatan untuk pekerjaan pembuatan lisplan dipasang dob


dengan lebar 35 Cm dengan mengunakan kayu papan kelas II .
* Mengunakan kayu yang berukuran ( 3/20 cm) dengan kualitas yang baik .
* Memulai pekerjaan Lisplank harus sesuai petunjuk direksi.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat : atau tertimpah papan kayu dan terjatu pa
saat pemasangan lisplank.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : hati - hati dalam mengangkat papan lisplank untuk
pasang dan diusahakan untuk membuat stager yang sangat kuat serta kok
agar tidak mudah roboh. Luka tangan : hati - hati memaku papan lispank ag
memperjatikan tangan dan jangan bercanda atau main - main pada sa
berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan pembuatan dan pemasang
Lisplank dengan mengunakan papan kelas II ( 3/20 cm ) yang sudah dikerjak
dan memperbaiki kembali pekerjaan yang kurang memuaskan sampai diterima b
oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan Lisplank (3 x 20) cm untuk dilaksanakan pada minggu ke 4 bulan III sesu
dengan jadwal pekerjaan.

d. Perhitungan Analisa
* Volume Lisplank Kayu Kls II : 41.80

PEKERJAAN PENGUNCI
4.32 Kunci Pintu 2 Slag KW I
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan peralatan pemasangan kunci tanam 2 slag yaituh peralatan tuka
kayu dan obeng.
* Mengunakan bahan kunci yang berkualitas baik (KW I) dan harus mendapatk
persetujuan direksi.
Membuat lubang kunci sesuai dengan ukuran kunci yang tersedia.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat : tertimpa daun pintu pada saat pemasanga
Luka tangan : terkena gergaji pada sat memotong daun pintu.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati-hati dalam mengangkat daun pintu diusahak
banyak orang. Luka tangan : pelan - pelan dalam mengergaji daun pintu da
jangan bercanda atau main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan memasang kunci tanam 2 sl
yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume pemasangan kunci tanam 2 slag : 6.00
4.33 Engsel Nylon
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan engsel nylon yaitu peralatan tukang kayu dan oben

* Mengunakan bahan engsel nylon untuk dipasang pada daun pintu sebagai bah
pengikat supaya bisa dibuka tutup pada daun pintu .
* Memulai pekerjaan Pemasangan engsel pintu harus sesuai petunjuk direksi.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat : tertimpa daun pintu pada saat pemasanga
Luka tangan : terkena alat pemotong pada sat memotong daun pintu.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati-hati dalam mengangkat daun pintu diusahak
banyak orang. Luka tangan : pelan - pelan dalam memotong daun pintu da
jangan bercanda atau main - main pada saat berkerja, memakai kaos tang
kerja dan sepatu kerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan engsel nylon yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume engsel nylon : 10.00

4.34 Engsel Kupu-kupu


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan engsel kupu-kupu yaitu peralatan tukang kayu dan
obeng.
* Mengunakan bahan engsel kupu-kupu untuk jendelah untuk dipasang pada da
jendela sebagai bahan pengikat supaya bisa dibuka tutup pada daun jendela .
* Memulai pekerjaan Pemasangan engsel kupu-kupu harus sesuai petunjuk direksi

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat : tertimpa daun pintu pada saat pemasanga
Luka tangan : terkena alat pemotong pada saat memotong daun jendela.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati-hati dalam mengangkat daun pintu diusahak
banyak orang. Luka tangan : pelan - pelan dalam memotong daun jendela da
jangan bercanda atau main - main pada saat berkerja, memakai kaos tang
kerja dan sepatu kerja..

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan engsel kupu-kupu yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume engsel Kupu-kupu : 16.00

4.35 Hag angin Besar


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan hak angin yaitu obeng dan peralatan tukang kayu.
* Mengunakan bahan hak angin untuk dipasang pada jendelah sebagai bah
pengkait antara jendelah daun jendelah dan kusen jendelah apabila kita kepingg
ruangan kena udara segar (angin).

* Memulai pekerjaan Pemasangan hak angin harus sesuai petunjuk direksi.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat : tertimpa hak angin pada saat pemasanga
Luka tangan : terjepit pintu pada saat pemasangan hak angin.
* Pengendalian Resiko K3
- Luka kaki dan kepalah : Hati-hati dalam mengangkat daun jende
diusahakan banyak orang. Luka tangan : pelan - pelan dalam mengergaji da
jendelah dan jangan bercanda atau main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan hak angin yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.

c. Rencana waktu pelaksanaan


Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume hak angin : 32.00

4.36 Angkel Kusen


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan grender kecil yaitu obeng dan peralatan tukang kay
* Mengunakan bahan grender kecil untuk jendela untuk dipasang pada jendel
sebagai bahan penganti kunci yang dipasang dibawah jendela .
* Memulai pekerjaan Pemasangan grender kecil harus sesuai petunjuk direksi.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat : tertimpa daun jendelah pada saat pemasanga
Luka tangan : terjepit daun jendela pada saat pemasangan grender.

* Pengendalian Resiko K3
- Memakai sepatu kerja dan kaos tangan kerja serta hati hati dalam berkerja d
tidak banyak bercanda serta main - main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan grender kecil yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume grender kecil : 30.00

PEKERJAAN PENGECATAN
4.37 Pengecetan Tembok Baru
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pembuatan untuk pengecetan Dinding yang dibutukan sepe
kuas, rol dan lain lain. .
* Mengunakan cat dasar untuk lapis pertama dengan satu kali dan dilanjutk
dengan dua kali cat penutup dan dengan kualitas yang baik yang terdapat pa
toko atau distributor resmi .

* Memulai pekerjaan pengecatan Dinding harus sesuai petunjuk direksi.


* Melaksanakan pengecetan mulai dari bagian atas menuju kebawah deng
menggunakan rol cat dan diselah kusen maupun kolom menggunakan kuas.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat : terjatu dari pada saat pengecetan dibagi
atas. Mata buta atau peri : terkena tumpahan cat pada saat pengecetan bagi
yang atas. Luka tangan : terkena gesekan amplas dan tembok pada sa
membersikan dan meratakan plamir pada dinding.

* Pengendalian Resiko K3
- Luka kaki dan kepalah : membuat stager yang koko dan kuat agar tid
mudah roboh, memakai helm sebagai pelindung kepala. Luka Mata : mema
kaca mata kerja untuk menghidari tumpahan cat pada mata saat mengec
Luka tangan : pelan - pelan dalam mengosok diusahan amplas dibungk
dengan potongan kayu 5/7 sebagai alas gosok agar tangan tidak bersentuh
langsung dengan amplas dan dinding dan jangan bercanda atau main - ma
pada saat berkerja.

Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pengecetan tembok baru yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 3 bulan IV sesuai jadwal pekerjaan.

d. Perhitungan analisa
* Volume Cat Tembok dan Beton : 824.66

4.38 Pengecatan Plafond


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat pembuatan untuk pengecetan plafoond yang dibutukan sepe
kuas, rol dan lain lain. .
* Mengunakan cat dasar untuk lapis pertama dengan satu kali dan dilanjutk
dengan dua kali cat penutup dan dengan kualitas yang baik yang terdapat pa
toko atau distributor resmi .

* Memulai pekerjaan pengecatan plafoond harus sesuai petunjuk direksi.


* Melaksanakan pengecetan mulai dari bagian kanan menujuh kekiri dengan ter
menerus.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki atau kepalah akibat : terjatu dari pada saat pengecetan dibagi
atas. Mata buta atau peri : terkena tumpahan cat pada saat pengecetan bagi
yang atas. Luka tangan : terkena gesekan amplas dan plafoond pada sa
membersikan dan meratakan plamir pada plafoond.

* Pengendalian Resiko K3
- Luka kaki dan kepalah : membuat stager yang koko dan kuat agar tid
mudah roboh, memakai helm sebagai pelindung kepala. Luka Mata : mema
kaca mata kerja untuk menghidari tumpahan cat pada mata saat mengec
Luka tangan : pelan - pelan dalam mengosok diusahan amplas dibungk
dengan potongan kayu 5/7 sebagai alas gosok agar tangan tidak bersentuh
langsung dengan amplas plafoond dan jangan bercanda atau main - ma
pada saat berkerja.

Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pengecetan plafoond yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 3 bulan IV sesuai jadwal pekerjaan.

d. Perhitungan analisa
* Volume Cat Plafoond : 261.00

Err:509
4.39 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan closed jongkok KW. I yaitu peralatan tukang batu d
lain-lain.
* menggunakan closed jongkok yang berkualitas baik yang terdapat pada distribu
resmi.
* Memulai pekerjaan Pemasangan closed jongkok harus sesuai petunjuk direksi.
* Memasang pasangan bata untuk peninggi dudukan klosed jongkok den diples
halus serta di aci, memasang closed sesuai dengan lubang pembuangan kotor
yang menuju septitenk.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan Tangan akibat : tertimpa dan terjepit closed jongkok.
* Pengendalian Resiko K3
- Luka tangan : hati - hati dalam mengangkat dan memasang closed jongk
serta jangan bercanda atau main - main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan closed jongk
yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan III sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume closed jongkok : Err:509

4.40 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan pipa dia. 3" yaitu peralatan tukang pipa d
pengelasan.
* menggunakan pipa PVC dia. 3 " dan lem pipa yang berkualitas baik yang terdap
pada distributor resmi.
* Memulai pekerjaan Pemasangan pipa PVC harus sesuai petunjuk direksi.

* memasang pipa PVc Diam. 3" untuk air kotor yang menuju pada bak septite
dengan sambungan sesuai dengan kebutuhan.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka Tangan akibat : terkena gergaji pemotong pipa.


* Pengendalian Resiko K3
- Luka tangan : hati - hati dalam memotong pipa pakai gergaji dan jang
bercanda atau main - main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan instalasi air ko
yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan III sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume Pipa 3 " : Err:509

4.41 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan pipa dia. 2" yaitu peralatan tukang pipa d
pengelasan.
* menggunakan pipa PVC dia. 2 " dan lem pipa yang berkualitas baik yang terdap
pada distributor resmi.
* Memulai pekerjaan Pemasangan pipa PVC harus sesuai petunjuk direksi.
* memasang pipa PVc Diam. 2" untuk air bersih dari sumur yang menuju pa
sambungan pipa menujuh pipa 3/4" dengan sambungan sesuai dengan kebutuhan

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka Tangan akibat : terkena gergaji pemotong pipa.


* Pengendalian Resiko K3
- Luka tangan : hati - hati dalam memotong pipa pakai gergaji dan jang
bercanda atau main - main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan instalasi air ko
yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan III sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume Pipa 2 " : Err:509

4.42 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan krang air yaitu peralatan tukang pipa dan lain-lain.

* menggunakan kran air dia. 3/4", Lem pipa, sto kran, pipa PVC, doubler neplen,
drak 3/4", sok drak 3/4" dan seal tape yang berkualitas baik yang terdapat pa
distributor resmi.

* Memulai pekerjaan Pemasangan kran air dia. 3/4" harus sesuai petunjuk direksi.
* Kita rakit pipa sesuai dengan ketentuan yang tercantum dalam spesifikasi ya
rekatkan seal tape pada double neplen pada setiap ujung dan sambungkan kn
drat dengan erat.
Kita rakit pipa sesuai dengan ketentuan yang tercantum dalam spesifikasi ya
rekatkan seal tape pada double neplen pada setiap ujung dan sambungkan kn
drat dengan erat.

* Potong pipa sesuai ukuran yang kita buat, oleskan pipa pada setiap ujung pipa ya
akan disambung
* Sambungan sto kran dengan pipa yang telah menyatu dengan double neplen d
kneet drat

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka Tangan akibat : terkena gergaji pipa.


* Pengendalian Resiko K3
- Luka tangan : hati - hati dalam memotong pipa dengan gergaji serta jang
bercanda atau main - main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan kran air dia. 3
yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan III sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume pemasangan kran air dia. 3/4" : Err:509

4.43 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan pipa dia. 3/4" yaitu peralatan tukang pipa d
pengelasan.
* menggunakan pipa PVC dia. 3/4 " dan lem pipa yang berkualitas baik yang terdap
pada distributor resmi.
* Memulai pekerjaan Pemasangan pipa PVC harus sesuai petunjuk direksi.
* memasang pipa PVc Diam. 3/4" untuk air bersih yang menuju pada kran air deng
sambungan sesuai dengan kebutuhan.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka Tangan akibat : terkena gergaji pemotong pipa.


* Pengendalian Resiko K3
- Luka tangan : hati - hati dalam memotong pipa pakai gergaji dan jang
bercanda atau main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan pemasangan Instalasi Air Ber
yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan III sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume Instalasi Air Bersih : Err:509

4.44 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan septitenk yaitu peralatan tukang pipa, tukang ba
tukang besi, tukang kayu dan lain-lain.
* Kita mengali bak air kotor dan bak resapan dengan ukuran sesuai gambar at
kapasitas 2 M3, dilanjutkan dengan pemasangan 1/2 batu bata, dilanjutkan deng
plesteran dan acian pas, batu bata.

* Memasang pipa penyambung antara lubang closed dengan bak penampung kotor
dan bak resapan.
* Membuat kerangka anyaman besi untuk cor penutup septitenk dilanjutkan deng
membuat begesting, jagan lupa pemasangan pipa pembuangan asap kotoran se
dilanjutkan dengan cor penutup septitenk.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan kepala akibat : tertimpah batu bata pada saat pemasangan ba
bata. Luka tangan : terkena potongan besi, kayu dan pipa.
* Pengendalian Resiko K3
- Luka kaki dan kepala : hati - hati dalam memasang bata harus diperhatik
kepala. Luka Tangan :hati - hati dalam memotong besi, kayu maupun p
dengan gergaji serta jangan bercanda atau main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan pemasangan septitenk ya
sudah dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuask
sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 3 bulan III sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume septitenk : 2.00

PEKERJAAN LISTRIK
4.45 Titik Lampu
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan titik lampu yaitu obeng, taspek.
* Mengunakan bahan pemasangan titik lampu antara lain kabel, pipa sebagai a
penyambung kabel yang melalui beton dan lain-lain.
* Memulai pekerjaan Pemasangan titik lampu harus sesuai petunjuk direksi d
dikerjakan oleh tukang listrik.
* Pelaksanaan pemasangan titik lampu harus dilaksanakan pada saat sele
pemasangan batu bata untuk membuat dan memasang pipa dan kabel selanjutn
dilakukan plesteran..

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan kepala akibat : terjatu dari atap atau plafoond pada sa
pemasangan titik lampu karna rangka plafoond menggunakan hollow ya
mudah lendut. Luka tangan : kesetrum listri.

* Pengendalian Resiko K3
- Luka kaki : Hati - hati dalam melangka diatas plafoond. Luka tangan : hati - h
dalam memegang kabel usahakan menggunakan taspen , jangan bercan
atau main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan titik lampu yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 3 bulan II sesuai dengan jadwal pekerjaa
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 3 bulan II sesuai dengan jadwal pekerjaa

d. Perhitungan analisa
* Volume Pasang titik lampu : 16.00

4.46 Lampu TL 20 Watt


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan lampu TL 20 Watt obeng, taspek.
* Memulai pekerjaan Pemasangan lampu TL 20 Watt harus sesuai petunjuk dire
dan dikerjakan oleh tukang listrik.
* Mengunakan bahan tempat gantung lampu TL 20 Watt philip yang dipasa
gantung di ruang sekolah dengan bahan tempat gantung lampu TL 20 Watt d
lampu TL 20 watt yang berkualitas baik.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan kepala akibat : terjatu pada saat pemasangan lampu TL 20 Wa
Luka tangan : kesetrum listri.
* Pengendalian Resiko K3
- Luka kaki : membuat stager atau tempat berdiri yang kuat dan koko agar tid
mudah roboh yang mengakibatkan jatu. Luka tangan : hati - hati dala
memegang kabel usahakan menggunakan taspen , jangan bercanda at
main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan lampu TL 20 Watt yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume lampu TL 20 Watt : 16.00

4.47 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan lampu Pijat 15, 25 dan 40 Waat obeng, taspek.
* Memulai pekerjaan Pemasangan lampu pijat harus sesuai petunjuk direksi d
dikerjakan oleh tukang listrik.
* Mengunakan bahan tempat gantung lampu pijat 15, 25 dan 40 Watt philip ya
dipasang gantung di ruang sekolah dengan bahan tempat gantung lampu pijat d
lampu pijat yang berkualitas baik.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- Luka kaki dan kepala akibat : terjatu pada saat pemasangan lampu pijat. Lu
tangan : kesetrum listri.
* Pengendalian Resiko K3
- Luka kaki : membuat stager atau tempat berdiri yang kuat dan koko agar tid
mudah roboh yang mengakibatkan jatu. Luka tangan : hati - hati dala
memegang kabel usahakan menggunakan taspen , jangan bercanda at
main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan lampu pijat 15, 25 dan 40 W
yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan

Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume lampu pijat 15, 25 dan 40 Watt : Err:509
4.48 Saklar Ganda ( Setara Philips )
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan Saklar ganda obeng, tespen.
* Mengunakan bahan saklar ganda biasanya dipasang pada daerah jangkau
terdekat untuk digunaka dalam menghidupkan dan mematikan lampu baik lampu
20 Watt tersendiri dan lampu Pijat 15, 25 dan 40 Watt.

* Memulai pekerjaan Pemasangan saklar ganda harus sesuai petunjuk direksi d


dikerjakan oleh tukang listrik.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- luka karna kesetrum listri.


* Pengendalian Resiko K3
- Hati - hati dalam memegang dan menyambung kabel usahakan menggunak
taspen , jangan bercanda atau main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan saklar ganda yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume saklar ganda : Err:509

4.49 Saklar Engkel ( Setara Philips )


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan Saklar tunggal obeng, taspek.
* Mengunakan bahan saklar tunggal biasanya dipasang pada daerah jangkau
terdekat untuk digunaka dalam menghidupkan dan mematikan lampu baik lampu
20 Watt tersendiri dan lampu Pijat 15, 25 dan 40 Watt.

* Memulai pekerjaan Pemasangan saklar tunggal harus sesuai petunjuk direksi d


dikerjakan oleh tukang listrik.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- luka karna kesetrum listri.


* Pengendalian Resiko K3
- Hati - hati dalam memegang dan menyambung kabel usahakan menggunak
taspen , jangan bercanda atau main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan saklar tunggal yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume saklar Tunggal : 1.00

4.50 Stop Kontak Tanam


a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan Stop Kontak tanam obeng, taspek.
* Mengunakan bahan pemasangan stop kontak tanam dipasang didekat tempat m
kerja untuk peralatan yang berhubungan dengan listrik berupa komputer, prin
dan lain-lain.
* Memulai pekerjaan Pemasangan stop kontak tanam harus sesuai petunjuk dire
dan dikerjakan oleh tukang listrik.

b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- luka karna kesetrum listri.


* Pengendalian Resiko K3
- Hati - hati dalam memegang dan menyambung kabel usahakan menggunak
taspen , jangan bercanda atau main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan stop kontak tanam yang sud
dikerjakan dan memperbaiki kembali pekerjaan yang kurang memuaskan samp
diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume stop kontak : 3.00

4.51 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan alat Pemasangan Zekering Box 1 Group obeng, taspek.
* Mengunakan bahan pemasangan zekering box 1 group dipasang pada sisi luar d
bangunan diusahakan ditempel pada dinding sebelah pintu utama.
* Memulai pekerjaan Pemasangan zekering box 1 group harus sesuai petunjuk dire
dan dikerjakan oleh tukang listrik.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko
- luka karna kesetrum listri.
* Pengendalian Resiko K3
- Hati - hati dalam memegang dan menyambung kabel usahakan menggunak
taspen , jangan bercanda atau main - main pada saat berkerja.

* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja


sebagai dasar untuk perhitungan volume pekerjaan pemasangan zekering box
group yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 4 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume Pemasangan Zekering Box 1 Group : Err:509

PEKERJAAN TAMBAHAN MEUBLEAR


4.52 Kursi Guru
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan peralatan tukang batu .
* Menyiapkan bahan batu tempel alur candi dengan kualitas baik yang terdapat pa
toko bangunan atau distributor terdekat.
* Menyiapkan campuran semen dan pasir pasang untuk pengikat pasangan batu ala
alur candi.
* Setelah pemasangan plesteran dinding yang dipasang harus dikasih lubang sedi
untuk pelekat pada saat pemasangan batu alam alur candi.
* Seting benang sebagai pembatas pada saat pemasangan batu alam alur candi d
memulai pemasangan batu alam alur candi mulai dari bawah menujuh keatas unt
menghidari turunnya batu alam yang sudah dipasang.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- luka kaki tertimpah batu alam, luka tangan pada saat memotong batu alam.
* Pengendalian Resiko K3
- Memakai sepatu kerja, kaos tangan kerja dan jangan bercanda serta mai
main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan batu alam a
candi yang sudah dikerjakan dan memperbaiki kembali pekerjaan yang kura
memuaskan sampai diterima baik oleh Direksi.

*Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume Pemasangan Batu Alam Alur Candi : 3.00

4.53 Err:509
a. Urutan cara pelaksanaan
* Mengajukan ijin kerja ke Direksi dengan dilampiri gambar kerja (Shoop Drawin
yang sudah disetujui.
* Membuat dokumentasi dalam kondisi 0% sebelum pekerjaan dimulai.
* Menyiapkan peralatan tukang batu .

* Menyiapkan bahan paving blok dan pasir urug dengan kualitas baik yang terdap
pada toko bangunan atau distributor terdekat.
* Pertama tama seting bouplank untuk pemasangan paving blok dan dilanjutkan pa
di urug setinggi 10 cm pada lokasi pemasangan paving blok.
* Melakukan pemasangan paving blok jenis tiga berlian pada lokasi pekerjaan d
setelah pemasangan paving dilanjutkan dengan urugan pasir di rongga anta
paving satu dengan yang lain untuk pengikat paving.

* Pada batas atau pinggir luar dari pasangan paving harus di buatkan beton sebag
penjepit paving.
b. Pengendalian Resiko K3
* Identifikasi jenis bahaya dan resiko

- luka kaki tertimpah paving, luka tangan terjepit paving pada saat pemasang
paving.
* Pengendalian Resiko K3
- Memakai sepatu kerja, kaos tangan kerja dan jangan bercanda serta mai
main pada saat berkerja.
* Bersama-sama dengan Direksi melakukan pemeriksaan atas mutu hasil pekerja
sebagai dasar untuk perhitungan volume pekerjaan pemasangan Paving Blok (Ty
Tiga Berlian) yang sudah dikerjakan dan memperbaiki kembali pekerjaan ya
kurang memuaskan sampai diterima baik oleh Direksi.

* Membuat dokumentasi dari hasil pekerjaan sebagai bahan laporan.


c. Rencana waktu pelaksanaan
Sesuai volume pekerjaan yang tertuang di dalam dokumen lelang waktu pelaksana
pekerjaan ini dilaksanakan pada minggu ke 2 bulan IV sesuai dengan jadwal pekerjaan

d. Perhitungan analisa
* Volume Pemasangan Paving Blok : Err:509

VI. PENUTUP
Melakukan pengecekan terhadap semua pekerjaan yang telah dilaksanakan agar berfun
sesuai dengan yang telah disyaratkan dalam dokumen kontrak, melakuk
penyempurnaan-penyempurnaan terhadap pekerjaan yang masih kurang sempurn
supaya pada waktu Running Test berjalan sesuai yang diharapkan, melakukan pembersih
lapangan dari sisa-sisa bahan bangunan.

Menyiapkan kelengkapan untuk pengajuan PHO/FHO antara lain : data ukur/back up da


shoop drawing, foto dokumentasi 0%, 50% dan 100%, Ijin Kerja (request), As Built Drawin
Data Laboratorium, dokumen kontrak, bukti setor pajak PPn, PPh, Galian C, astek d
pajak-pajak lainnya sesuai dengan ketentuan.

Demikian garis besar Metode Pelaksanaan ini kami buat untuk menjadi pedoman dala
pelaksanaan pekerjaan : Pembangunan Kantor Camat Woha Kabupaten Bima.

Err:509
Penawar,
Err:509
Err:509
sa Tente Kabupaten Bima

ijing dan Risalah kami

iapan/pembuatan Direksi
bangunan lama, photo
mobilisasi personil dan
penyiapan Gambar Kerja

n Tanah Sampai Pekerjaan

ihan lokasi, pembuatan


ekerjaan yang diusertai

ma.

ekerjaan ditetapkan 120 (


ma 180 ( seratus delapan

ikan bahwa Urugan Tanah


ng diperoleh pada sekitar
an batu dapat diperoleh
n di sekitarnya. Kesediaan
dapat diperoleh di sungai

an bahwa semen PC yang


onal Indonesia (SNI) N.I.8.
roleh di toko/distributor

isikan bahwa Besi yang


onal Indonesia (SNI) N.I.8.
roleh di toko/distributor

an bahwa Batu bata yang


yang memenuhi Standar
ujuan direksi teknik dan

isikan bahan kayu yang


untuk daun pintu, lisplank
rkualitas baik atau sesuai
utor terdekat.

isikan bahwa baja yang


Nasional Indonesia (SNI)
eroleh di toko/distributor

sikan bahwa batan atap


kualitas baik atau sesuai
utor terdekat.

tenaga lokal, sedangkan


ebal 3 mm
terkait, penyiapan kantor
a kerja, pengukuran dan

SPMK sampai kegiatan


an masing-masing item

nnya Surat Perintah Mulai


e instansi terkait (Bupati,
.

sanaan pekerjaan.

ang terdiri atas pimpinan


lapangan dalam rangka
ksanaan pekerjaan dapat
aupun non fisik kantor

alam waktu 7 (tujuh) hari


an siap ditempati.

uat Rencana Kerja (Work


dalam Pre Construction
terkait untuk persetujuan
3 (tiga) hari kalender.

kebutuhan (terinci dalam


sikan sesegera mungkin
at ukur, peralatan, studio

bulan I dan pengukuran


I sesuai dengan jadwal

= 1 Rol
= 1 Unit

lam penjabarannya akan


si.

ar kerja (shoop drawing)

ebelum galian pondasi,


ma linggis, palu besar dan

gai bahan timbunan dan


reksi atas hasil pekerjaan
umen pekerjaan sebagai

n jepitan kayu bongkaran


lbahan ain-lain.

ak diperbolekan bercanda
atu kerja dan helm kerja

elang waktu pelaksanaan


I sesuai dengan jadwal

Err:509 Pkt

ar kerja (shoop drawing)

engan pengalian pondasi


rta atas petunjuk direksi.

dengan manusia yang


lain - lain yang dapat
akan tenaga manusia .

untuk pondasi pasangan


i petunjuk direksi.
han urugan kembali dan
yang tidak berguna harus
reksi atas hasil pekerjaan
umen pekerjaan sebagai

cop pada saat pengalian.

bercanda dalam berkerja,


i titik nol dan yang mulai
membelakangi dan harus
li, memakai sepatu kerja,

elang waktu pelaksanaan


I sesuai dengan jadwal

- M3

ar kerja (shoop drawing)

manusia dapat dilakukan


n tenaga manusia dan

manusia yang dimaksud


m dan sisi luar pasangan

uk Direksi
an setelah pemasangan
gan pondasi pada galian
an peninggi lantai dalam
reksi atas hasil pekerjaan
umen pekerjaan sebagai

timpa peralatan stampel


sa galian dan pada saat
maupun kanan pasangan

am selah pondasi, hindari


t menghidupkan stampel
tanah urugkan kembali ,

elang waktu pelaksanaan


engan jadwal pekerjaan.

- M3

ar kerja (shoop drawing)

an dan peralatan sesuai


n dump truck sebagai alat
akan skop, pacul serta

yang diambil dari quary

hamparan per 15 cm
n menggunakan staper,
ai dengan bestek atau

petunjuk Direksi
reksi atas hasil pekerjaan
umen pekerjaan sebagai

enghamparan tanah urug


pel. Luka tangan akibat :
alatan stampel.

jauhkan dari kita yang


mengatur jarak pada saat
auhkan kaki pada saat
an Hati hati tangan pada
betul pada saat menutup
mesin stampel, memakai

elang waktu pelaksanaan


II sesuai dengan jadwal

- M3

ar kerja (shoop drawing)

peralatan sesuai dengan


cul dan lain - lain.
dengan ketebalan sesuai
ai keramik dengan tebal
an petunjuk direksi.

juk Direksi

reksi atas hasil pekerjaan


umen pekerjaan sebagai

penghamparan pasir urug


tangan akibat : terkena

jauhkan dari kita yang


mengatur jarak pada saat
n dibawah lantai dengan
uka bak truck di usahakan
.

elang waktu pelaksanaan


uk urugan pasir dibawah
gan pasir dibawah lantai

- M3

ar kerja (shoop drawing)


n tenaga manusia, bahan
n petunjuk Direksi Teknik

n botu kosong untuk


engan lebar pondasi yang

rongga untuk pasir urung


ikatan antara batu yang

reksi atas hasil pekerjaan


umen pekerjaan sebagai

h batu kali pada saat


urunkan batu kali yang
atu . Luka tangan akibat :
i tusukan batu kali yang
atu.

jauhkan dari kita yang


erhatikan kaki pada saat
rta perhatikan kaki padaa
pekerjaan. Luka Tangan
ahakan diperhatikan betul
an pada saat pengangkat
tu.

elang waktu pelaksanaan


ngan jadwal pekerjaan.

0.12 M3
ar kerja (Shoop Drawing)

an dimulai.

dengan dimensi rencana

taranya : Batu kali alam,


1Pc : 5Ps manual dan air

ai dari pondasi/koperan

Kali 1Pc : 5Psr

m mortal pasangan batu

tas mutu hasil pekerjaan


ali 1Pc : 5Psr yang sudah
rang memuaskan sampai

h batu kali pada saat


urunkan batu kali yang
puran spesi, terkena batu
at : terkena tutupan bak
ng runcung dan terkena
atu kali.
jauhkan dari kita yang
erhatikan kaki pada saat
ngkut batu dan pada saat
saat rekan yang lain
an Hati hati tangan pada
betul pada saat menutup
angkat batu, menurunkan
batu kali.

elang waktu pelaksanaan


ggu ke 4 bulan I sesuai

0.19 M3

ar kerja (Shoop Drawing)

an dimulai.
5Psr di antaranya : Bata,
n.

dengan dimensi rencana


elurusan pasangan bata

dipasang guna menjamin

dan tukang batu dengan


lah pemasangan trasram

ngan campura
am bata harus
bar di depan
esuai dengan

tas mutu hasil pekerjaan


ng 1/2 bata 1Pc : 5Psr,
pekerjaan yang kurang
uck, tertimpah batu bata
terkena jepitan batu bata

jauhkan dari kita yang


g batu oleh pekerja harus
erkerja. Luka Tangan Hati
urunan serta penyusunan
an menyusun batu bata,
ang lebih tinggi.

elang waktu pelaksanaan


dengan jadwal pekerjaan.

122.05 M2

ar kerja (Shoop Drawing)

an dimulai.
: 5Psr tebal 15 mm, untuk
kotak takaran, dan kotak

ang akan diplester guna

h menuju keatas dengan


k yang membawah pasir.

mp truck jauhkan dari kita


main pada saat berkerja.

elang waktu pelaksanaan


dengan jadwal pekerjaan.

354.27 M2

ar kerja (Shoop Drawing)

an dimulai.
3Psr tebal 15 mm, untuk
n, air, kotak takaran, dan

diplester guna menjamin

keatas dengan ketebalan


k yang membawah pasir.
an dinding yang tinggi.

mp truck jauhkan dari kita


main pada saat berkerja.

elang waktu pelaksanaan


dengan jadwal pekerjaan.

Err:509 M2

ar kerja (Shoop Drawing)

an dimulai.
ranya : semen, air, kotak
etelah selesai pekerjaan

n ikatan antara acian dan

dengan ketebalan sesuai


k yang membawah pasir.
an dinding yang tinggi.

mp truck jauhkan dari kita


main pada saat berkerja.

elang waktu pelaksanaan


dengan jadwal pekerjaan.

Err:509 M2

ar kerja (Shoop Drawing)

an dimulai.
menggunakan besi polos
kan peralatan pemotong

eton sloof 15/20 cm yang


petunjuk direksi.
uai dengan ukuran yang
si yang dipakai besi polos

ukuran dan bentuk yang

besi, menganyam besi.

, jagan bercanda dalam


hati dalam mengikat besi
menggunakan alat khusus

tas mutu hasil pekerjaan


esian Beton Sloof yang
yang kurang memuaskan

elang waktu pelaksanaan


minggu ke 4 bulan ke I

132.00 Kg

ar kerja (Shoop Drawing)

of di antaranya : papan
n tukang kayu.
an beton sesuai dengan

ada saat memaku.

n bercanda saat berkerja

tas mutu hasil pekerjaan


esting sloof yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


1 bulan II sesuai dengan

- M2

ar kerja (Shoop Drawing)

an dimulai.
175 dengan ukuran 15/20
takaran, dan kotak untuk
ta menggunakan tenaga

ulu yang akan dicampur

ir dan kerikir serta air


2Psr : 3Krl, pada saat
en untuk menghasilkan
uda pemasangan pondasi
r, akibat terjepit mesin
an dan terjatu pada saat

xer, jangan bercanda saat


ukan bahan adukan pada
helm kerja.

tas mutu hasil pekerjaan


beton sloof yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


ulan ke II sesuai dengan

- M3

ar kerja (Shoop Drawing)

an dimulai.
menggunakan besi polos
kan peralatan pemotong

ton kolom 40/40 cm yang


petunjuk direksi.

uai dengan ukuran yang


si yang dipakai besi polos

ukuran dan bentuk yang


besi, menganyam besi.

, jagan bercanda dalam


hati dalam mengikat besi
menggunakan alat khusus

tas mutu hasil pekerjaan


esian Beton kolom 40/40
pekerjaan yang kurang

elang waktu pelaksanaan


akan pada minggu ke 1

- Kg

ar kerja (Shoop Drawing)

m 40/40 cm di antaranya :
eralatan tukang kayu.

an beton sesuai dengan


ada saat memaku.

n bercanda saat berkerja


an kerja.
tas mutu hasil pekerjaan
ing Kolom 40/40 cm yang
yang kurang memuaskan

elang waktu pelaksanaan


inggu ke 2 bulan II sesuai

- M2

ar kerja (Shoop Drawing)

an dimulai.
175 dengan ukuran 40/40
takaran, dan kotak untuk
ta menggunakan tenaga

ulu yang akan dicampur

ir dan kerikir serta air


2Psr : 3Krl, pada saat
en untuk menghasilkan
uda pemasangan pondasi

r, akibat terjepit mesin


an dan terjatu pada saat
xer, jangan bercanda saat
ukan bahan adukan pada
helm kerja.

tas mutu hasil pekerjaan


on kolom 40/40 cm yang
yang kurang memuaskan

elang waktu pelaksanaan


gu ke 2 bulan ke II sesuai

0.11 M3

ar kerja (Shoop Drawing)

an dimulai.
menggunakan besi polos
kan peralatan pemotong

ton kolom 20/20 cm yang


petunjuk direksi.

uai dengan ukuran yang


si yang dipakai besi polos

ukuran dan bentuk yang


besi, menganyam besi.

, jagan bercanda dalam


hati dalam mengikat besi
menggunakan alat khusus

tas mutu hasil pekerjaan


esian Beton kolom 20/20
pekerjaan yang kurang

elang waktu pelaksanaan


akan pada minggu ke 1

156.27 Kg

ar kerja (Shoop Drawing)

m 20/20 cm di antaranya :
eralatan tukang kayu.

an beton sesuai dengan


ada saat memaku.

n bercanda saat berkerja


an kerja.
tas mutu hasil pekerjaan
ing Kolom 20/20 cm yang
yang kurang memuaskan

elang waktu pelaksanaan


inggu ke 2 bulan II sesuai

0.09 M2

ar kerja (Shoop Drawing)

an dimulai.
175 dengan ukuran 20/20
takaran, dan kotak untuk
ta menggunakan tenaga
unan.

ulu yang akan dicampur

ir dan kerikir serta air


2Psr : 3Krl, pada saat
en untuk menghasilkan
uda pemasangan pondasi

r, akibat terjepit mesin


an dan terjatu pada saat

xer, jangan bercanda saat


ukan bahan adukan pada
helm kerja.

tas mutu hasil pekerjaan


on kolom 20/20 cm yang
yang kurang memuaskan
elang waktu pelaksanaan
gu ke 2 bulan ke II sesuai

- M3

ar kerja (Shoop Drawing)

an dimulai.
menggunakan besi polos
kan peralatan pemotong

ton kolom 13/13 cm yang


petunjuk direksi.

uai dengan ukuran yang


si yang dipakai besi polos

ukuran dan bentuk yang

besi, menganyam besi.


, jagan bercanda dalam
hati dalam mengikat besi
menggunakan alat khusus

tas mutu hasil pekerjaan


esian Beton kolom 13/13
pekerjaan yang kurang

ar kerja (Shoop Drawing)

m 13/13 cm di antaranya :
eralatan tukang kayu.

an beton sesuai dengan

ada saat memaku.

n bercanda saat berkerja


an kerja.
tas mutu hasil pekerjaan
ing Kolom 13/13 cm yang
yang kurang memuaskan

ar kerja (Shoop Drawing)


an dimulai.
175 dengan ukuran 13/13
takaran, dan kotak untuk
ta menggunakan tenaga
unan.

ulu yang akan dicampur

ir dan kerikir serta air


2Psr : 3Krl, pada saat
en untuk menghasilkan
uda pemasangan pondasi

r, akibat terjepit mesin


an dan terjatu pada saat

xer, jangan bercanda saat


ukan bahan adukan pada
helm kerja.

tas mutu hasil pekerjaan


on kolom 13/13 cm yang
yang kurang memuaskan

elang waktu pelaksanaan


gu ke 2 bulan ke II sesuai

- M'

ar kerja (Shoop Drawing)

an dimulai.
menggunakan besi polos
kan peralatan pemotong
beton balok 15/25 untuk
alam bestek atau sesuai

uai dengan ukuran yang


si yang dipakai besi polos

ukuran dan bentuk yang

besi, menganyam besi.

, jagan bercanda dalam


hati dalam mengikat besi
menggunakan alat khusus

elang waktu pelaksanaan


minggu ke 3 bulan ke II

Err:509 Kg

ar kerja (Shoop Drawing)

ok 15/25 di antaranya :
eralatan tukang kayu.
an beton sesuai dengan

ada saat memaku.


n bercanda saat berkerja

tas mutu hasil pekerjaan


ting balok 15/25 cm yang
yang kurang memuaskan

elang waktu pelaksanaan


minggu ke 4 bulan ke II

Err:509 M2

ar kerja (Shoop Drawing)

an dimulai.
antaranya : semen, pasir
campuran menggunakan
ang batu.

ulu yang akan dicampur

ir dan kerikir serta air


2Psr : 3Krl, pada saat
en untuk menghasilkan

r, akibat terjepit mesin


an dan terjatu pada saat

xer, jangan bercanda saat


ukan bahan adukan pada
kokoh agar tidak mudah

tas mutu hasil pekerjaan


on balok 15/25 cm yang
yang kurang memuaskan
elang waktu pelaksanaan
gu ke 4 bulan ke II sesuai

Err:509 M3

ar kerja (Shoop Drawing)

an dimulai.
menggunakan besi polos
kan peralatan pemotong

beton ring Balok yang


petunjuk direksi.

uai dengan ukuran yang


si yang dipakai besi polos

ukuran dan bentuk yang


besi, menganyam besi.

, jagan bercanda dalam


hati dalam mengikat besi
menggunakan alat khusus

ar kerja (Shoop Drawing)

g balok di antaranya :
eralatan tukang kayu.
an beton sesuai dengan

ada saat memaku.

n bercanda saat berkerja

tas mutu hasil pekerjaan


gesting Ring Balok yang
yang kurang memuaskan

ar kerja (Shoop Drawing)

an dimulai.
antaranya : semen, pasir
campuran menggunakan
ang batu.

ulu yang akan dicampur

ir dan kerikir serta air


2Psr : 3Krl, pada saat
en untuk menghasilkan

r, akibat terjepit mesin


an dan terjatu pada saat

xer, jangan bercanda saat


ukan bahan adukan pada
kokoh agar tidak mudah

tas mutu hasil pekerjaan


n ring Balok yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


bulan ke II sesuai dengan

0.48 M'

ar kerja (Shoop Drawing)

an dimulai.
menggunakan besi polos
kan peralatan pemotong

ton plat dak yang dirakit


ertera dalam bestek atau
uai dengan ukuran yang
si yang dipakai besi polos

ukuran dan bentuk yang

besi, menganyam besi.

, jagan bercanda dalam


hati dalam mengikat besi
menggunakan alat khusus

elang waktu pelaksanaan


u ke 3 bulan ke II sesuai

Err:509 Kg

ar kerja (Shoop Drawing)

dak di antaranya : papan


sebagai perancang serta

an beton sesuai dengan


ada saat memaku.

n bercanda saat berkerja

tas mutu hasil pekerjaan


ting plat dak yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


ke 4 bulan ke II sesuai

Err:509 M2

ar kerja (Shoop Drawing)

an dimulai.
5, di antaranya : semen,
campuran menggunakan
ang batu.

ulu yang akan dicampur

ir dan kerikir serta air


2Psr : 3Krl, pada saat
en untuk menghasilkan

pengangkutan campuran
nuangkan diatas ayaman

r, akibat terjepit mesin


an dan terjatu pada saat
xer, jangan bercanda saat
ukan bahan adukan pada
kokoh agar tidak mudah

tas mutu hasil pekerjaan


on plat dak yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


bulan ke II sesuai dengan

Err:509 M3

ar kerja (Shoop Drawing)

an dimulai.
, di antaranya : semen,
campuran menggunakan
ang batu.

k lantai kerja sebelum


dengan lantai kerja beton

ulu yang akan dicampur

ir dan kerikir serta air


2Psr : 3Krl, pada saat
en untuk menghasilkan

pengangkutan campuran
cara menuangkan diatas

r, akibat terjepit mesin


an dan terjatu pada saat

xer, jangan bercanda saat


ukan bahan adukan pada
ngan kerja.
tas mutu hasil pekerjaan
n lantai kerja yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


ke 1 bulan ke IV sesuai

Err:509 M3

ar kerja (Shoop Drawing)

an dimulai.
pintu, kusen jendela dan
l, fischer, sekrup, isolasi
ngkai sesuai ukuran kusen

dalah obeng, bor tembok


si.

lubang kusen agar tidak


an dengan ukuran kusen

ar posisinya pas dengan


kelurusan kusen dengan
us.

alui lubang kusen dengan


kedalam lubang bor yang
n fischer.

an terjadi goresan atau


itu kita buat pelindung
mengangkat alumenium.
oresan tangan karna kena

m, memakai sepatu kerja


berkerja, luka tangan :

tas mutu hasil pekerjaan


Pintu, kusen jendela dan
rbaiki kembali pekerjaan
.

elang waktu pelaksanaan


dengan jadwal pekerjaan.

0.88 M'
ar kerja (Shoop Drawing)

an dimulai.
pintu, daun jendela dan
l, fischer, sekrup, isolasi
ng sudah dirangkai sesuai

tu dan daun jendelah


au karet dibantu dengan

lubang kusen agar tidak


an dengan ukuran kusen

ar posisinya pas dengan


kelurusan daun pintu dan
mpai benar-benar bagus.

alui lubang kusen dengan


kedalam lubang bor yang
n fischer.

irangkai penuh, misalnya

en kemudian kita pasang


an lainnya.

ggunakan bahan mortal,


up semua celah antara

an terjadi goresan atau


itu kita buat pelindung
mengangkat alumenium.
dan kaca polos, goresan
rup..

m, memakai sepatu kerja


berkerja, luka tangan :

tas mutu hasil pekerjaan


Pintu dan daun Jendelah
rbaiki kembali pekerjaan
.

elang waktu pelaksanaan


dengan jadwal pekerjaan.

6.40 M2

ar kerja (Shoop Drawing)

an dimulai.

bestek dan atas petunjuk


luka tangan pada saat

tas mutu hasil pekerjaan


Sun Blant yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


dengan jadwal pekerjaan.

Err:509 M2

ar kerja (Shoop Drawing)

an dimulai.
an plafoond tripleks yaitu
balok induk dan 4/6 cm
n peralatan tukang kayu

r pemasangan plafoond

bagai balok pembagi


njuk direksi.
gan bestek atau sesuai
gka harus bisa mengukur

kin kalau perlu diadakan


foond karna dia sebagai

uk pemasangan plafoond
gan ukuran sesuai besar
rangka maupun tripleks

uran water pass untuk


masangan rangka maupun
pada saat pemasangan
kayu maupun tripleksdan

m memasangan plafoond,
ti dalam memotong kayu
ngan bercanda atau main

tas mutu hasil pekerjaan


angan plafoond tripleks 3
pekerjaan yang kurang

elang waktu pelaksanaan


dengan jadwal pekerjaan.

261.00 M2

ar kerja (Shoop Drawing)

an dimulai.
gunan atau distributor list

r pemasangan plafoond

ngan list serta


plafoond dengan
elurusan pemasangan list
elihatan.
stager sebagai tangga

da saat pemasangan list


g list plafoond maupun

emasangan list plafoond,


hati dalam memotong list
ercanda atau main - main

tas mutu hasil pekerjaan


angan List plafoond yang
yang kurang memuaskan

elang waktu pelaksanaan


dengan jadwal pekerjaan.

130.00 M'

ar kerja (Shoop Drawing)

an dimulai.
kang batu, alat pemotong
m polos , semen, semen

sesuai petunjuk direksi.


tai keramik harus bersi,

mudah merekat dengan

ng rata air.
h baik permukaan dasar
ata - rata 2 sampai 4 cm

mm dari campuran semen

i yang sudah terpasang


40/40 cm yang tidak arsir

saat mengambil keramik.


ena palu jari pada saat

diusahan diangkat satu


- hati dalam memotong
au alat pemukul keramik
tangan, memakai kaos
pada saat berkerja.

tas mutu hasil pekerjaan


asangan keramik 40 x 40
pekerjaan yang kurang
elang waktu pelaksanaan
n pada minggu ke 1 bulan

104.40 M2

ar kerja (Shoop Drawing)

an dimulai.
tu peralatan Tukang Batu

motif dengan kualitas

tuk lantai KM/WC harus

mudah merekat dengan

ng rata air.
h baik permukaan dasar
ata - rata 2 sampai 4 cm

mm dari campuran semen

i yang sudah terpasang


dengan hitam itu yang

saat mengambil keramik.


ena palu jari pada saat

diusahan diangkat satu


keramik dan memadatkan
agar padat dan berisi
a atau main - main pada
tas mutu hasil pekerjaan
masangan lantai keramik
erbaiki kembali pekerjaan
.

elang waktu pelaksanaan


bulan IV sesuai dengan

Err:509 M2

ar kerja (Shoop Drawing)

an dimulai.
ralatan Tukang Batu dan

motif dengan kualitas

uk dinding KM/WC harus

mudah merekat dengan

ang rata.
h baik permukaan dasar
rata - rata 2 cm.
ri campuran semen atau
i yang sudah terpasang
angan desain agar tidak

saat mengambil keramik.


ena palu jari pada saat

diusahan diangkat satu


keramik dan memadatkan
agar padat dan berisi
a atau main - main pada

mutu hasil pekerjaan


gan Dinding keramik
iki kembali pekerjaan

elang waktu pelaksanaan


ilaksanakan pada minggu

Err:509 M2
ar kerja (Shoop Drawing)

an dimulai.
pemasangan rangka baja

aituh 9 - 10 Kg/M2
uai petunjuk direksi.
TCT, tinggi penampang C
imal 5 mmTCT.
ldex untuk struktur kuda-

bentuk kuda- kuda berikut


okasi baut.
k menghidari kesalahan

bali permukaan ring balk


harus diberi ganjaran atau
a - kuda. Tidak dianjurkan
an ganjaran atau bahan

cara manual atau dengan


titik sebagai titik tumpu
k menghidari dari resiko

an sejajar satu sama lain,


mbar. Setelah kuda-kuda
ang/ disediakan bracing
saat pemasangan rangka
gka baja ringgan.

ngan rangka baja ringan


antara baja ringan untuk
dalam memotong rangka
ada saat berkerja.

tas mutu hasil pekerjaan


ka baja ringa yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


2 bulan III sesuai dengan

238.99 M2

ar kerja (Shoop Drawing)

an dimulai.
ng mengunakan Genteng

ik .
petunjuk direksi.
tas mutu hasil pekerjaan
emasangan Atap dengan
dan memperbaiki kembali
leh Direksi.
a saat pemasangan atap
ena alat pemotong atap

masangan atap metal roof


ng atap metal roof karna
main - main pada saat

tas mutu hasil pekerjaan


emasangan Atap dengan
dan memperbaiki kembali
leh Direksi.

elang waktu pelaksanaan


3 bulan III sesuai dengan

356.70 M'

ar kerja (Shoop Drawing)


an dimulai.
mengunakan bubungan

or resmi dengan kualitas

Bubungan Multi Roof

akan paku dan antara


yang lain.

pada saat pemasangan


n : terkena alat pemotong

memasangan bubungan
i dalam memotong dan
kena tangan dan jangan

tas mutu hasil pekerjaan


asangan bubungan metal
erjakan dan memperbaiki
ma baik oleh Direksi.

elang waktu pelaksanaan


engan jadwal pekerjaan.
30.50 M'

ar kerja (Shoop Drawing)

an dimulai.

n lisplan dipasang dobel


s II .
alitas yang baik .

an kayu dan terjatu pada

at papan lisplank untuk di


sangat kuat serta kokoh
maku papan lispank agar
main - main pada saat

tas mutu hasil pekerjaan


buatan dan pemasangan
) yang sudah dikerjakan
kan sampai diterima baik

elang waktu pelaksanaan


nggu ke 4 bulan III sesuai
41.80 M'

ar kerja (Shoop Drawing)

an dimulai.
yaituh peralatan tukang

dan harus mendapatkan

ersedia.

pada saat pemasangan.


un pintu.

at daun pintu diusahakan


engergaji daun pintu dan

tas mutu hasil pekerjaan


asang kunci tanam 2 slag
pekerjaan yang kurang

elang waktu pelaksanaan


engan jadwal pekerjaan.

6.00 Bh
ar kerja (Shoop Drawing)

an dimulai.
tukang kayu dan obeng.

aun pintu sebagai bahan

i petunjuk direksi.

pada saat pemasangan.


ong daun pintu.

at daun pintu diusahakan


emotong daun pintu dan
ja, memakai kaos tangan

tas mutu hasil pekerjaan


ngsel nylon yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


engan jadwal pekerjaan.

10.00 Psg
ar kerja (Shoop Drawing)

an dimulai.
latan tukang kayu dan

tuk dipasang pada daun


pada daun jendela .
sesuai petunjuk direksi.

pada saat pemasangan.


otong daun jendela.

at daun pintu diusahakan


motong daun jendela dan
ja, memakai kaos tangan

tas mutu hasil pekerjaan


el kupu-kupu yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


engan jadwal pekerjaan.

16.00 Psg

ar kerja (Shoop Drawing)


an dimulai.
eralatan tukang kayu.
jendelah sebagai bahan
ah apabila kita kepinggin

etunjuk direksi.

pada saat pemasangan.


k angin.

ngangkat daun jendelah


n dalam mengergaji daun
saat berkerja.

tas mutu hasil pekerjaan


hak angin yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


engan jadwal pekerjaan.

32.00 Bh

ar kerja (Shoop Drawing)

an dimulai.
n peralatan tukang kayu.
dipasang pada jendelah
ela .
ai petunjuk direksi.

h pada saat pemasangan.


ngan grender.

ti hati dalam berkerja dan


erkerja.
tas mutu hasil pekerjaan
ender kecil yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


engan jadwal pekerjaan.

30.00 Bh

ar kerja (Shoop Drawing)

an dimulai.
g yang dibutukan seperti

atu kali dan dilanjutkan


baik yang terdapat pada

njuk direksi.
enuju kebawah dengan
nggunakan kuas.
aat pengecetan dibagian
a saat pengecetan bagian
dan tembok pada saat

oko dan kuat agar tidak


ala. Luka Mata : memakai
ada mata saat mengecat.
sahan amplas dibungkus
angan tidak bersentuhan
ercanda atau main - main

tas mutu hasil pekerjaan


embok baru yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


adwal pekerjaan.

824.66 M2

ar kerja (Shoop Drawing)

an dimulai.
d yang dibutukan seperti

atu kali dan dilanjutkan


baik yang terdapat pada

unjuk direksi.
ujuh kekiri dengan terus
aat pengecetan dibagian
a saat pengecetan bagian
dan plafoond pada saat

oko dan kuat agar tidak


ala. Luka Mata : memakai
ada mata saat mengecat.
sahan amplas dibungkus
angan tidak bersentuhan
canda atau main - main

tas mutu hasil pekerjaan


n plafoond yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


adwal pekerjaan.

261.00 M2
ar kerja (Shoop Drawing)

an dimulai.
eralatan tukang batu dan

terdapat pada distributor

uai petunjuk direksi.


ed jongkok den diplester
ang pembuangan kotoran

osed jongkok.

memasang closed jongkok


rkerja.
tas mutu hasil pekerjaan
masangan closed jongkok
pekerjaan yang kurang

elang waktu pelaksanaan


engan jadwal pekerjaan.

Err:509 Bh

ar kerja (Shoop Drawing)

an dimulai.
alatan tukang pipa dan

alitas baik yang terdapat

tunjuk direksi.

nuju pada bak septitenk

akai gergaji dan jangan

tas mutu hasil pekerjaan


sangan instalasi air kotor
pekerjaan yang kurang

elang waktu pelaksanaan


engan jadwal pekerjaan.

Err:509 M'

ar kerja (Shoop Drawing)

an dimulai.
alatan tukang pipa dan

alitas baik yang terdapat

tunjuk direksi.
umur yang menuju pada
suai dengan kebutuhan.

akai gergaji dan jangan

tas mutu hasil pekerjaan


sangan instalasi air kotor
pekerjaan yang kurang

elang waktu pelaksanaan


engan jadwal pekerjaan.

Err:509 M'

ar kerja (Shoop Drawing)

an dimulai.
ang pipa dan lain-lain.

PVC, doubler neplen, kni


baik yang terdapat pada

esuai petunjuk direksi.


dalam spesifikasi yaitu
ng dan sambungkan knet
da setiap ujung pipa yang

engan double neplen dan

gan gergaji serta jangan

tas mutu hasil pekerjaan


sangan kran air dia. 3/4"
pekerjaan yang kurang

elang waktu pelaksanaan


engan jadwal pekerjaan.

Err:509 Bh

ar kerja (Shoop Drawing)

an dimulai.
ralatan tukang pipa dan

ualitas baik yang terdapat

etunjuk direksi.
uju pada kran air dengan

akai gergaji dan jangan

tas mutu hasil pekerjaan


angan Instalasi Air Bersih
pekerjaan yang kurang

elang waktu pelaksanaan


engan jadwal pekerjaan.

Err:509 M'

ar kerja (Shoop Drawing)

an dimulai.
ukang pipa, tukang batu,

uran sesuai gambar atau


bata, dilanjutkan dengan

n bak penampung kotoran

titenk dilanjutkan dengan


angan asap kotoran serta
da saat pemasangan batu
pipa.

bata harus diperhatikan


besi, kayu maupun pipa
ain pada saat berkerja.

tas mutu hasil pekerjaan


masangan septitenk yang
yang kurang memuaskan

elang waktu pelaksanaan


engan jadwal pekerjaan.

2.00 Bh

ar kerja (Shoop Drawing)

an dimulai.
ek.
kabel, pipa sebagai alat

uai petunjuk direksi dan

akan pada saat selesai


pa dan kabel selanjutnya

atau plafoond pada saat


enggunakan hollow yang

d. Luka tangan : hati - hati


spen , jangan bercanda

tas mutu hasil pekerjaan


titik lampu yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


dengan jadwal pekerjaan.
16.00 Bh

ar kerja (Shoop Drawing)

an dimulai.
pek.
sesuai petunjuk direksi

t philip yang dipasang


g lampu TL 20 Watt dan

sangan lampu TL 20 Watt.

kuat dan koko agar tidak


gan : hati - hati dalam
jangan bercanda atau

tas mutu hasil pekerjaan


u TL 20 Watt yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


engan jadwal pekerjaan.
16.00 Bh

ar kerja (Shoop Drawing)

an dimulai.
aat obeng, taspek.
uai petunjuk direksi dan

dan 40 Watt philip yang


gantung lampu pijat dan

sangan lampu pijat. Luka

kuat dan koko agar tidak


gan : hati - hati dalam
jangan bercanda atau

tas mutu hasil pekerjaan


pijat 15, 25 dan 40 Watt
pekerjaan yang kurang

elang waktu pelaksanaan


engan jadwal pekerjaan.

Err:509 Bh
ar kerja (Shoop Drawing)

an dimulai.

pada daerah jangkauan


ikan lampu baik lampu TL

suai petunjuk direksi dan

l usahakan menggunakan
berkerja.

tas mutu hasil pekerjaan


aklar ganda yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


engan jadwal pekerjaan.

Err:509 Bh

ar kerja (Shoop Drawing)


an dimulai.
k.
pada daerah jangkauan
ikan lampu baik lampu TL

suai petunjuk direksi dan

l usahakan menggunakan
berkerja.

tas mutu hasil pekerjaan


klar tunggal yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


engan jadwal pekerjaan.

1.00 Bh

ar kerja (Shoop Drawing)

an dimulai.
aspek.
sang didekat tempat meja
berupa komputer, printer
s sesuai petunjuk direksi

l usahakan menggunakan
berkerja.

tas mutu hasil pekerjaan


kontak tanam yang sudah
rang memuaskan sampai

elang waktu pelaksanaan


engan jadwal pekerjaan.

3.00 Bh

ar kerja (Shoop Drawing)

an dimulai.
, taspek.
pasang pada sisi luar dari
utama.
us sesuai petunjuk direksi
l usahakan menggunakan
berkerja.

tas mutu hasil pekerjaan


masangan zekering box 1
pekerjaan yang kurang

elang waktu pelaksanaan


engan jadwal pekerjaan.

Err:509 Bh

ar kerja (Shoop Drawing)

an dimulai.

baik yang terdapat pada

gikat pasangan batu alam

rus dikasih lubang sedikit


.
batu alam alur candi dan
ah menujuh keatas untuk
memotong batu alam.

n bercanda serta main -

tas mutu hasil pekerjaan


masangan batu alam alur
pekerjaan yang kurang

elang waktu pelaksanaan


engan jadwal pekerjaan.

3.00 M2

ar kerja (Shoop Drawing)

an dimulai.

alitas baik yang terdapat

blok dan dilanjutkan pasir


k.
ada lokasi pekerjaan dan
pasir di rongga antara

di buatkan beton sebagai


ng pada saat pemasangan

n bercanda serta main -

tas mutu hasil pekerjaan


sangan Paving Blok (Type
kembali pekerjaan yang

elang waktu pelaksanaan


engan jadwal pekerjaan.

Err:509 M2

aksanakan agar berfungsi


n kontrak, melakukan
masih kurang sempurna,
, melakukan pembersihan

: data ukur/back up data,