KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
TAHUN ANGGARAN : 0
HARGA
NO. URAIAN SATUAN KETERANGAN
(Rp)
A BAHAN
1 Tanah Urug M3 85,000.00
2 Tanah Taman M3 85,000.00
3 Pasir Urug M3 100,000.00
4 Pasir Pasang M3 120,000.00
5 Pasir Plester M3 120,000.00
6 Pasir Beton/Cor M3 120,000.00
7 Sirtu Palupi M3 100,000.00
8 Koral Beton / Kerikil Split M3 150,000.00
9 Portland Cement Kg 1,500.00 50 Kg / Zak
10 Semen Putih Kg 5,000.00 50 Kg/Zak
11 Semen Warna Kg 15,000.00
12 AM. - 30 Mortar Flex Kg 12,500.00
13 Kapur Acian Kg 1,250.00 20 Kg / Zak
14 Batu Kali / Belah M3 135,000.00
15 Batu Bata Kecil Bh 800.00 Ukuran Kecil
16 Batu Bata Besar Bh 1,000.00 Ukuran Besar
17 Batako Pres Bh 1,350.00
18 Paving Blok Type A Bh 1,800.00
19 Roster 25 x 25 Bh 7,000.00
20 Batu Alam M2 50,000.00
21 Besi Beton Polos Kg 15,000.00
22 Besi Beton Ulir Kg 15,500.00
23 Kawat Beton Kg 20,000.00
24 Kawat Duri Roll 57,500.00 1,150.00 Panjang 50 M1
25 Kawat Harmonika Roll 370,800.00 12,360.00 Panjang 30 M2
26 Paku Biasa Kg 25,000.00
27 Paku seng Kg 26,000.00
28 Paku Genteng Kg 27,000.00
29 Paku Tripleks Kg 14,000.00
30 Kayu Kelas I M3 3,775,500.00
31 Kayu Kelas II, (Daerah) M3 1,400,000.00
32 Kayu Kelas III (campuran) M3 900,000.00
33 Kayu Terentang M3 850,000.00
34 Dolken (Tiang Perancah/Daerah) M3 1,000,000.00 10,000.00 / Batang
35 Kayu List Kaca Btg 25,200.00 6,300.00 Panjang 4 M1
36 PapanListplank M3 2,100,000.00
37 List Plafond M3 2,300,000.00
38 Teakwood, 120 x 240 x 4 mm Lbr 85,000.00
39 Tripleks 120 x 240 x 3 mm Lbr 60,000.00
40 Tripleks lapis Aluminium 120 x 240 x 4 mm Lbr 85,000.00
41 Multiplex 122 x 240 x 5 mm Lbr 84,975.00
42 Lem Kayu Kg 12,000.00
43 Kunci Pintu 2 Slaag Set 75,000.00
44 Kunci Pintu 1 Slaag Set 49,000.00
45 Engsel Pintu Psg 15,000.00
46 Engsel Jendela Psg 10,000.00
47 Grendel Tanam Pintu Bh 17,500.00
48 Grendel Jendela Bh 13,000.00
49 Grendel Pintu Bh 14,000.00
50 Hak Angin Baut Mur Psg 6,000.00
51 Tarikan Jendela Bh 7,500.00
52 Seng Gelombang Besar BJLS 0,25 Lbr 46,150.00
53 Seng Plat BJLS 0,25 Lbr 87,500.00
HARGA
NO. URAIAN SATUAN KETERANGAN
(Rp)
54 Seng Talang Lebar 30 cm M1 9,000.00
55 Genteng Metal 0.3 Lbr 50,000.00
56 Bubungan Genteng Lbr 17,500.00
57 Plint Keramik M1 18,000.00
58 Keramik 10 x 10 cm. Bh 360.00
59 Keramik 10 x 20 cm. Dos 38,500.00 770.00 Buah
60 Keramik 20 x 25 cm. Dos 49,000.00 2,450.00 Buah
61 Tegel Keramik 20 x 20 cm. Dos 55,000.00 2,200.00 Buah
62 Tegel Keramik 30 x 30 cm. Dos 37,500.00 6,578.95 Buah
63 Tegel Keramik 40 x 40 cm (warna) Dos 62,500.00 9,426.85 Buah
64 Stop Kran Bronze Dia. 3/4" Bh 48,500.00
65 Tap Kran Bronze Dia. 3/4" Bh 30,000.00
66 Kran Leideng Bh 15,000.00
67 Klosed Duduk Biasa Setara INA Set 395,000.00
68 Kloset Jongkok Setara INA Set 175,000.00
69 Floor Drain Plastik Bh 12,500.00
70 Water more uk 3/4" Bh 17,500.00
71 Wastafel standar Ex. INA Bh 225,000.00
72 Bak Cuci Piring Stainless Stell 1 Lobang Bh 175,000.00
73 Pompa Air Nasional 250 Watt Set 435,000.00
74 Pintu Fiber Lengkap Bh 280,000.00
75 Pipa GIP 1/2" Btg 45,600.00 7,600.00 Panjang 6 M1
76 Pipa GIP 3/4" Btg 62,000.00 10,333.33 Panjang 6 M1
77 Pipa GIP 2 1/2" Btg 161,000.00 26,833.33 Panjang 6 M1
78 Pipa GIP 2" Btg 153,000.00 25,500.00 Panjang 6 M1
79 Pipa GIP 1" Btg 76,500.00 12,750.00 Panjang 6 M1
80 Pipa PVC 3" Btg 56,300.00 14,075.00 Panjang 4 M1
81 Pipa PVC 4" Btg 92,300.00 23,075.00 Panjang 4 M1
82 Pipa PVC 1/2" Btg 12,725.00 3,181.25 Panjang 4 M1
83 Pipa PVC 3/4" Btg 14,800.00 3,700.00 Panjang 4 M1
84 Pipa PVC 1 1/2" Btg 30,100.00 7,525.00 Panjang 4 M1
85 Pipa PVC 2" Btg 39,500.00 9,875.00 Panjang 4 M1
86 Besi Siku 30 x 3 mm x 6 m' Btg 49,750.00 8,291.67 Panjang 6 M1
87 Besi Siku 40 x 4 mm x 6 m' Btg 85,000.00 14,166.67 Panjang 6 M1
88 Besi Siku 50 x 5 mm x 6 m' Btg 124,000.00 20,666.67 Panjang 6 M1
89 Besi Plat 120cm X 120 cm X 3 mm Lbr 595,000.00
90 Besi Beton Polos uk. 12 mm Btg 37,595.00 3,417.73 Panjang 11 M1
91 Cat Kayu Setara Avian Kg 20,500.00
92 Cat Tembok Kg 5,500.00
93 Cat Seng Kg 25,000.00
94 Cat Besi Kg 28,000.00
95 Teak oil Vernis Kg 28,000.00
96 Minyak Cat (Afdunner) Ltr 11,500.00
97 Meni Kayu Kg 7,750.00
98 Meni Besi Kg 23,500.00
99 Teer Residu Kg 7,000.00
100 Dempul Tembok (Plamir) Kg 4,700.00
101 Dempul Kayu Kg 15,000.00
102 Kertas Pasir Lbr 2,850.00
103 Kuas Rol Bh 20,000.00
104 Kuas cat 3" Bh 5,000.00
105 Minyak Bekisting Liter 2,500.00
106 Kaca Bening 3 mm M2 84,000.00
107 Kaca Bening 5 mm M2 122,500.00
108 Kaca Rayben 5 mm M2 142,000.00
109 Instalasi Titik Lampu Ttk 92,700.00
110 Lampu TL Biasa 20 Watt Bh 20,000.00
111 Lampu TL Biasa 40 Watt Bh 45,000.00
112 Lampu XL 40 Watt, setara Philips Bh 93,300.00
113 Lampu Pijar 10 - 40 Watt Bh 37,500.00
114 Lampu Pijar 60 - 100 Watt Bh 40,000.00
115 Saklar Ganda Bh 8,000.00
HARGA
NO. URAIAN SATUAN KETERANGAN
(Rp)
116 Saklar Tunggal Bh 5,500.00
117 Saklar Tripel Bh 32,500.00
118 Stop Kontak Bh 6,000.00
119 Stop Kontak + Instalasi Bh 103,000.00
120 Pipa Penghawaan Bh 25,000.00
121 Ijuk Roll 35,000.00
122 Sekering Kas 2 Group Komplit Bh 28,235.00
123 Box Besar Bh 450,000.00
124 Penangkal Petir Ttk 1,500,000.00
125 Batu Karang Resapan M3 192,500.00
126 Cawat, Beugel, Angker dan Baut kg 12,500.00
B UPAH
1 Kepala Tukang Org/Hr 55,000.00
2 Mandor Org/Hr 50,000.00
3 Tukang Org/Hr 50,000.00
4 Pekerja Org/Hr 35,000.00
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
TAHUN ANGGARAN : 0
I. PEKERJAAN TANAH
1 Anl. SNI 6.8, 1 M2 Pekerjaan Pengecatan Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
0.0700 Org/ Hr Pekerja Rp. 35,000.00 = Rp. 2,450.00
0.0025 Org/ Hr Mandor Rp. 50,000.00 = Rp. 125.00
0.0090 Org/ Hr Tukang Cat Rp. 50,000.00 = Rp. 450.00
0.0060 Org/ Hr Kepala Tukang Cat Rp. 55,000.00 = Rp. 330.00
0.2000 Kg Cat Meni Rp. 7,750.00 = Rp. 1,550.00
0.1500 Kg Plamir Rp. 15,000.00 = Rp. 2,250.00
0.1700 Kg Cat Dasar Rp. 20,500.00 = Rp. 3,485.00
0.2600 Kg Cat Penutup 2 Kali Rp. 20,500.00 = Rp. 5,330.00
Rp. 15,970.00
2 Anl. SNI 6.6, 1 M2 Pekerjaan Mendempul dan Menggosok Kayu
0.0400 Org/ Hr Pekerja Rp. 35,000.00 = Rp. 1,400.00
0.0025 Org/ Hr Mandor Rp. 50,000.00 = Rp. 125.00
0.0400 Org/ Hr Tukang Cat Rp. 50,000.00 = Rp. 2,000.00
0.0040 Org/ Hr Kepala Tukang Cat Rp. 55,000.00 = Rp. 220.00
0.0800 Kg Dempul Jadi Rp. 15,000.00 = Rp. 1,200.00
0.0200 Kg Minyak Cat Rp. 11,500.00 = Rp. 230.00
1.0000 Lbr Kertas Pasir Rp. 2,850.00 = Rp. 2,850.00
= Rp. 8,025.00
Untuk 1 M2 pek. mendempul dan pengecatan kayu = Anl. SNI 6,8 + Anl. SNI 6,6 = Rp. 23,995.00
3 Anl.SNI 6,14 1 M2 Pengecetan Tembok Baru / Plafond (1 lapis plamir, 1 lapis Cat Dasar,
2 Lapis Cat Penutup)
0.0200 Org/ Hr Pekerja Rp. 35,000.00 = Rp. 700.00
0.0025 Org/ Hr Mandor Rp. 50,000.00 = Rp. 125.00
0.0630 Org/ Hr Tukang Cat Rp. 50,000.00 = Rp. 3,150.00
0.0063 Org/ Hr Kepala Tukang Cat Rp. 55,000.00 = Rp. 346.50
0.1000 Kg Plamir Rp. 4,700.00 = Rp. 470.00
0.1000 Kg Cat Dasar Rp. 5,500.00 = Rp. 550.00
0.2600 Kg Cat Penutup 2 kali Rp. 5,500.00 = Rp. 1,430.00
Rp. 6,771.50
4 Anl. SNI 6,12 , 1 M2 Pelaburan Bidang Kayu dengan Cat Residu atau Ter
0.1000 Org/ Hr Pekerja Rp. 35,000.00 = Rp. 3,500.00
0.0060 Org/ Hr Mandor Rp. 50,000.00 = Rp. 300.00
0.3500 Ltr Teer Residu Rp. 7,000.00 = Rp. 2,450.00
Rp. 6,250.00
5 Anl. SNI 6,23, 1 m2 Pekerjaan Pengecatan Permukaan Baja lapis seng (galbani) secara manual
sistem 1 lapis cat mutakhir
0.0060 Org/ Hr Pekerja Rp. 35,000.00 = Rp. 210.00
0.0060 Org/ Hr Mandor Rp. 50,000.00 = Rp. 300.00
0.0600 Org/ Hr Tukang Cat Rp. 50,000.00 = Rp. 3,000.00
0.0120 Org/ Hr Kepala Tukang Cat Rp. 55,000.00 = Rp. 660.00
0.3000 Kg Cat Seng Rp. 25,000.00 = Rp. 7,500.00
Rp. 11,670.00
6 Anl. SNI 6,11, 1 m2 Pekerjaan Pelaburan Bidang Kayu dengan Politur
0.0000 Org/ Hr Pekerja Rp. 35,000.00 = Rp. 0.00
0.0025 Org/ Hr Mandor Rp. 50,000.00 = Rp. 125.00
0.0600 Org/ Hr Tukang Cat Rp. 50,000.00 = Rp. 3,000.00
0.0160 Org/ Hr Kepala Tukang Cat Rp. 55,000.00 = Rp. 880.00
0.1500 Ltr Politur Rp. 28,000.00 = Rp. 4,200.00
0.3720 Ltr Politur Jadi Rp. 28,000.00 = Rp. 10,416.00
2.0000 Lbr Kertas Pasir Rp. 2,850.00 Rp. 5,700.00
Rp. 24,321.00
7 Anl. SNI 6,20, 1 m2 Pekerjaan Pengecetan permukaan baja dengan meni besi
0.0200 Org/ Hr Pekerja Rp. 35,000.00 = Rp. 700.00
0.0100 Org/ Hr Mandor Rp. 50,000.00 = Rp. 500.00
0.2000 Org/ Hr Tukang Cat Rp. 50,000.00 = Rp. 10,000.00
0.0200 Org/ Hr Kepala Tukang Cat Rp. 55,000.00 = Rp. 1,100.00
0.1000 Kg Meni Besi Rp. 23,500.00 = Rp. 2,350.00
0.1700 Kg Cet Besi Rp. 28,000.00 = Rp. 4,760.00
0.0100 Bh Kuas Rp. 5,000.00 = Rp. 50.00
Rp. 19,460.00
LOKASI :
TAHUN ANGGARAN :
HARGA
NO. URAIAN PEKERJAAN SAT VOLUME SATUAN
(Rp)
1 2 3 4 5
I. PEKERJAAN PENDAHULUAN
01 Pek. Pembersihan Awal & Pemasangan Bouwplank Ls 1.000 363,000.00
Jumlah I
II. PEKERJAAN TANAH DAN PASIR
01 Pek. Galian Tanah Pondasi & Cansteen m3 27.576 16,000.00
02 Pek. Urugan Kembali Bekas Galian m3 6.894 7,670.00
03 Pek. Urugan Pasir m 3
12.383 131,000.00
Jumlah II
III. PEK. PASANGAN & PLESTERAN
01 Pek. Pas. Batu Kosong m3 9.651 242,895.00
02 Pek. Pas. Pondasi Batu Kali 1 : 5 m 3
33.362 507,330.00
03 Pek. Pas. Cansteen Batu Bata 1 : 5 m2 2.240 192,890.00
04 Pek. Plesteran Cansteen 1 : 5 m2 24.000 24,945.00
05 Pek. Acian 1 pc : 7 kapur m 2
24.000 6,818.00
06 Pek. Pas. Paving Blok m2 235.660 94,250.00
Jumlah III
IV. PEKERJAAN LAIN-LAIN / AKHIR
01 Pembersihan Akhir Ls 1.000 300,000.00
EERING ESTIMATE ( E.E )
JUMLAH
HARGA
(Rp)
6
363,000.00
363,000.00
441,216.00
52,876.98
1,622,173.00
2,116,265.98
2,344,179.65
16,925,543.46
432,073.60
598,680.00
163,632.00
22,210,955.00
42,675,063.71
300,000.00
300,000.00
ENGINEERING ESTIMATE ( E.E )
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
TAHUN ANGGARAN : 0
REKAPITULASI
NO. URAIAN PEKERJAAN JUMLAH HARGA
1 2 3
JUMLAH Rp 45,454,329.69
PPN 10 % Rp 4,545,432.97
IZIN MENDIRIKAN BANGUNAN (IMB) Rp -
JUMLAH TOTAL Rp 49,999,762.65
DIBULATKAN Rp 50,000,000.00