10

40
53.5
22
54.3
89
41
9
panjang 318.8 m1
buang
pagu 499,177,983.87 5.00% 24,958,899.19

rab 1,565,803 m/1


ril 1,411,410 m/1

154,393
318.8
sisa
474,219,084.68

1,487,513 m/1

- 76,103
asumsi hitungan ril troar dalam 1 m1

batu 0.3 Kubik 200,000 60,000


pasir 0.4 kubik 200,000 80,000
kerikil 0.4 kubik 200,000 80,000
semen 4 zak 63,000 252,000
besi 10 3 lonjor 80,000 240,000
besi 6 1 Lonjor 35,000 35,000
Papan 3 Lembar 30,000 90,000
keramik 1 dos 75,000 75,000
giuding 5 lbr 15,000 75,000
987,000
pajak 12% 118,440
upah 16% 157,920
profit 15% 148,050
1,411,410 m1
besi utama 10
4
6
10
begel dia 6

besi plat dia 10


0.28 1.2

8
6.67
14.66666667
1 btg
1 Btg

si plat dia 10

2 btg