DAFTAR HARGA SATUAN BAHAN, ALAT & UPAH KONSTRUKSI

HARGA
No URAIAN BAHAN, ALAT & UPAH SATUAN
SATUAN

A BAHAN
1 Semen 50 Kg Sak 74,500.00
2 Pasir Pasang m3 265,000.00
3 Batu Belah m3 250,000.00
4 Sirtu m3 154,600.00
5 Pasir Urug m3 121,500.00
6 Pasir Beton m3 300,000.00
7 Batu Split 2/3 cm m3 250,000.00
Besi beton dia. 8 mm Btg 44,000.00
8 Besi beton dia. 10 mm Btg 58,500.00
9 Besi beton dia. 12 mm Btg 88,000.00
10 Besi beton dia. 16 mm Btg 171,200.00
11 Pipa Besi Galvanis dia. 2" Btg 682,600.00
12 Pipa PVC Dia. 4" Btg 140,000.00
13 Pipa PVC Dia. 6 Inch M' 148,750.00
14 Kawat Beton kg 25,000.00
15 Kayu Papan Begisting lbr 33,200.00
16 Kayu Kaso 5/7 cm Borneo btg 55,800.00
17 Kayu Kaso 5/7 cm Albasiah btg 28,700.00
18 Paku kg 15,000.00
19 Kuas Besar bh 15,000.00
20 Kuas Kecil bh 10,000.00
21 Cat Besi kg 50,100.00
22 Cat Tembok kg 35,000.00
23 Meni Besi kg 22,400.00
24 Plamur tembok kg 25,000.00
25 Batu Pecah 5-7 cm m3 231,900.00
26 Kayu Bakar m3 143,500.00
27 Batu pecah 3-5 cm m3 204,300.00
28 Batu pecah 2-3 cm m3 276,100.00
29 Batu pecah 1-2 cm m3 243,000.00
30 Batu pecah 0,5-1 cm/screen m3 303,700.00
32 Aspal Drum 12,100.00
33 Buis Beton Dia. 50 cm - 100 cm bh -
34 Multiplex 0,9 cm lbr -
35 Plastik cor kg -
36 Minyak Begisting Ltr 5,000.00
Bata Merah Kelas I Bh 1,000.00
Kaca 5 mm Lbr 85,000.00
GRC Lbr 88,000.00
Kusen Pintu Kayu Bh 250,000.00
Kusen Jendela Kayu Bh 350,000.00
HARGA
No URAIAN BAHAN, ALAT & UPAH SATUAN
SATUAN
Bambu Btg 10,000.00
Kramik Dus 49,500.00
Cat Kayu Kg 55,000.00
Rol Cat Bh 25,000.00
Close set Bh 200,000.00
Kran Air Bh 62,000.00
Pintu WC Bh 250,000.00
Tarikan dan Kunci Bh 150,000.00
Tarikan Jendela Bh 13,500.00
Engsel Bh 15,000.00
Daun Pintu Kayu Lbr 500,000.00

B ALAT
1 Cangkul Bh 82,800.00
2 Sekop Bh 132,500.00
3 Ember Bh 11,000.00
4 Benang Bh 5,500.00
5 Sendok Tembok Bh 27,600.00
6 Linggis Bh 127,000.00
7 Belincong Bh 209,800.00
9 Palu Besar Bh 115,900.00
10 Palu Kecil Bh 49,700.00
11 Pengki Bh 33,100.00
12 Sewa mesin Molen Hari 276,100.00
13 Sewa Mesin Gilas / Stoom Wall Jam 331,300.00
14 Mobilisasi & Demobilisasi Alat Ls 4,000,000.00

C UPAH
1 Pekerja OH 60,000.00
2 Tukang OH 80,000.00
3 Mandor OH 100,000.00

** Harga Satuan Sudah Termasuk PPN dan PPh Pelasana Kegiatan


Kasi Kesejahteraan

aaaaaaaaaaaaa
TAKE OFF SHEET JALAN RABAT
Jenis Kegiatan Jalan Rabat Beton Lokasi
Volume Panjang (m') : 71 Lebar : 1 m' Desa Kadu
Tebal (m') : 0.1 m'

Papan Bekisting
Pasir Urug t 5 cm
10
Rabat Beton t cm
12 cm

2.50
2,5 m
m

A 1 m3 BETON NON STRUKTURAL/RABAT KELAS B0 (K.719)


Panjang Jalan (P) 71 meter
Lebar Jalan (L) 1 meter
Tebal Rabat (t) 0.1 meter
· Volume Rabat = P x L x t
= 71 x 1 x 0.1
= 7.1 m 3

Kebutuhan Bahan dan Upah


Bahan Koef Vol Jumlah Sat
Semen portland 4.431 7.10 31.46 zak
Pasir Beton 0.461 7.10 3.27 m3
Split 2/3 0.769 7.10 5.46 m3
Upah Koef Vol Jumlah Sat
Pekerja 1.646 7.10 11.69 HOK
Tukang 0.462 7.10 3.28 HOK

B Mengurug 1 M3 Pasir Urug (ABK.200.11)


Panjang Jalan (P) 71 meter
Lebar Jalan (L) 1 meter
Tebal Urugan (t) 0.05 meter
· Volume Urugan = P x L x t
= 71 x 1 x 0.05
= 3.55 m 3

Kebutuhan Bahan dan Upah


Bahan Koef Vol Jumlah Sat
Pasir urug 1.200 3.55 4.26 m3
Upah Koef Vol Jumlah Sat
Pekerja 0.300 3.55 1.07 HOK
TAKE OFF SHEET JALAN RABAT
Jenis Kegiatan Jalan Rabat Beton Lokasi
Volume Panjang (m') : 71 Lebar : 1 m' Desa Kadu
Tukang 0.010 3.55 0.04 HOK

C Pekerjaan Bekisting (K.710)


2 2 2 2 2

Panjang Jalan (P) 71 m'


Lebar Jalan (L) 1.00 m'
Tebal Bekisting (t) 0.1 m'
· Volume Jalan = P x 2 sisi
= 71 x 2 sisi
= 142 m' ==> Volume 1
· Vol. Delatasi = P / 2 + 1 x L
(per 2 meter) = 71 / 2 + 1 x 1
= 36.5 m' ==> Volume 2
· Volume Total = Vol. 1 + Vol. 2 x t
= 142 + 36.5 x 0.1
= 17.85 m 2

Bahan Koef Vol Jumlah Sat atau per btg Jml Sat
Papan Bekisting 3/20 0.030 17.85 0.18 m3 2/30 0.018 9.92 btg
Paku biasa 2" - 5" 0.200 17.85 1.19 Kg --> Paku + papan utk 3 x pakai
Upah Koef Sat Jumlah Sat
Pekerja 0.350 17.85 6.25 HOK
Tukang 0.150 17.85 2.68 HOK

D Kebutuhan Mesin Molen


Produktivitas/kemampuan alat untuk Molen 1 hr 6 m3

Volume rabat = 7.1 m3


Sewa molen = 7.1 = 1.18333 hari
6

REKAPITULASI KEBUTUHAN BAHAN, ALAT DAN UPAH

Bahan Vol Sat Sat


Semen portland 31.46 31.00 Zak
Pasir Beton 3.27 3.00 M3
Split 2/3 5.46 5.00 M3
Pasir urug 4.26 4.00 M3
TAKE OFF SHEET JALAN RABAT
Jenis Kegiatan Jalan Rabat Beton Lokasi
Volume Panjang (m') : 71 Lebar : 1 m' Desa Kadu
Papan Bekisting 3/20 0.18 0.00 M3
9.92 10.00 btg
Paku biasa 2" - 5" 1.19 1.00 Kg
Sewa molen 1.18 1.00 hr
Upah Vol Sat Sat
Pekerja 19.00 19.00 HOK
Tukang 5.99 6.00 HOK
RENCANA ANGGARAN BIAYA
(Jalan Rabat Beton)

Propinsi : Jawa Barat No. RAB : 01


Kabupaten : Jenis Kegia : Jalan Rabat Beton
Kecamatan : Lokasi :
Desa : Ukuran/dim: 500 x 2,5 meter

Harga JUMLAH
Volume
No. Uraian Satuan satuan TOTAL
Total
(Rp) (Rp)
BAHAN
1 Semen portland 31 zak 61,000 1,891,000
2 Pasir Beton 3 m 3
120,000 360,000
3 Split 2/3 5 m3 200,000 1,000,000
4 Pasir urug 4 m3 90,000 360,000
5 Papan Bekisting 3/20 - m3 1,400,000 -
6 Paku biasa 2" - 5" 1 m 3
12,000 12,000
7 Err:509 Err:509 m2 5,000 Err:509
Sub Total 1) Err:509
ALAT
1 Ember 20 bh 5,000 100,000
2 Meteran 2 bh 10,000 20,000
3 Palu 2 bh 35,000 70,000
4 Cangkul 4 bh 50,000 200,000
5 Sekop 2 bh 35,000 70,000
6 Kereta dorong 1 b 500,000 500,000
7 Sewa molen 1 hr 400,000 400,000
Sub Total 2) 1,360,000
UPAH
1 Pekerja 19 HOK 52,000 988,000
2 Tukang 6 HOK 60,000 360,000
Sub Total 3) 1,348,000
Total Biaya Err:509
RENCANA ANGGARAN BIAYA (RAB)
DESA KADU KECAMATAN JATIGEDE
TAHUN ANGGARAN 2022

No.RAB :
Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Pemb. Jalan Rabat Beton
Waktu Pelaksanaan : 60 Hari kerja
Lokasi :
Volume : 7.10 m3

Harga Satuan Jumlah Total


No. URAIAN Volume Satuan
Rp Rp
1 2 3 4 5 6=5x3
1 Belanja Barang dan Jasa
a. Biaya Lain-lain :
- Prasasti 1.00 ls Rp 500,000 Rp 500,000
- Biaya Perencanaan 1.00 ls Rp 1,500,000 Rp 1,500,000
- Pembuatan Papan Kegiatan 1.00 paket Rp 200,000 Rp 200,000
- Dokumentasi 1.00 paket Rp 150,000 Rp 150,000
- Pembuatan Laporan Kegiatan 1.00 paket Rp 400,000 Rp 400,000
b. Sewa Mesin Molen 1.00 hari Rp 276,100 Rp 276,100
c. Sewa Arco 60.00 hari Rp 20,000 Rp 1,200,000
d. Pekerja 19.00 hari Rp 90,000 Rp 1,710,000
e. Tukang 6.00 hari Rp 120,000 Rp 720,000
f. Oprasional TPK 1.00 ls Rp 2,000,000 Rp 2,000,000

Sub Total (1) Rp 8,656,100


2 Belanja Modal
Semen portland 31.00 zak Rp 66,000 Rp 2,046,000
Pasir Beton 3.00 m3 Rp 320,300 Rp 960,900
Split 2/3 5.00 m3 Rp 276,500 Rp 1,382,500
Pasir urug 4.00 m3 Rp 143,500 Rp 574,000
Papan Bekisting 3/20 10.00 btg Rp 30,000 Rp 300,000
Paku biasa 2" - 5" 1.00 kg Rp 17,500 Rp 17,500
Pengki 8.00 bh Rp 29,800 Rp 238,400
Ember 23.00 bh Rp 12,500 Rp 287,500
Meteran 1.00 bh Rp 21,500 Rp 21,500
Benang 5.00 bh Rp 5,000 Rp 25,000
Sekop 2.00 bh Rp 110,400 Rp 220,800
Cangkul 2.00 bh Rp 75,100 Rp 150,200
Bambu - btg Rp 12,100 Rp -

Sub Total (2 ) Rp 6,224,300

TOTAL RAB Rp 14,880,400

DIBULATKAN Rp 14,880,000

Kadu, ......................... 2022

Disetujui/mengesahkan : Diverifikasi oleh :


Kepala Desa Kepala UPTD ………………… Pelaksana Kegiatan
KADU Wil. ……………………… Kasi Ekbang

.................................... .................................... ....................................