Anda di halaman 1dari 11

DAFTAR HARGA SATUAN BAHAN, ALAT & UPAH KONSTRUKSI

No URAIAN BAHAN, ALAT & UPAH SATUAN HARGA SATUAN

A BAHAN
1 Semen 50 Kg Sak 74,500.00
2 Pasir Pasang m3 265,000.00
3 Batu Belah m3 250,000.00
4 Sirtu m3 154,600.00
5 Pasir Urug m3 121,500.00
6 Pasir Beton m3 300,000.00
7 Batu Split 2/3 cm m3 250,000.00
Besi beton dia. 8 mm Btg 44,000.00
8 Besi beton dia. 10 mm Btg 82,500.00
9 Besi beton dia. 12 mm Btg 88,000.00
10 Besi beton dia. 16 mm Btg 171,200.00
Tulangan Besi Beton Kg 23,100.00
11 Pipa Besi Galvanis dia. 2" Btg 682,600.00
12 Pipa PVC Dia. 4" Btg 140,000.00
13 Pipa PVC Dia. 6 Inch M' 148,750.00
14 Kawat Beton kg 25,000.00
15 Kayu Papan Begisting lbr 33,200.00
16 Kayu Kaso 5/7 cm Borneo btg 55,800.00
17 Kayu Kaso 5/7 cm Albasiah btg 28,700.00
18 Paku kg 15,000.00
19 Kuas Besar bh 15,000.00
20 Kuas Kecil bh 10,000.00
21 Cat Besi kg 50,100.00
22 Cat Tembok kg 35,000.00
23 Meni Besi kg 22,400.00
24 Plamur tembok kg 25,000.00
25 Batu Pecah 5-7 cm m3 231,900.00
26 Kayu Bakar m3 143,500.00
27 Batu pecah 3-5 cm m3 204,300.00
28 Batu pecah 2-3 cm m3 276,100.00
29 Batu pecah 1-2 cm m3 243,000.00
30 Batu pecah 0,5-1 cm/screen m3 303,700.00
32 Aspal Drum 12,100.00
33 Buis Beton Dia. 50 cm - 100 cm bh -
34 Multiplex 0,9 cm lbr -
35 Plastik cor kg -
36 Minyak Begisting Ltr 5,000.00
Bata Merah Kelas I Bh 1,000.00
Kaca 5 mm Lbr 85,000.00
GRC Lbr 88,000.00
Kusen Pintu Kayu Bh 250,000.00
Kusen Jendela Kayu Bh 350,000.00
No URAIAN BAHAN, ALAT & UPAH SATUAN HARGA SATUAN
Bambu Btg 10,000.00
Kramik Dus 49,500.00
Cat Kayu Kg 55,000.00
Rol Cat Bh 25,000.00
Close set Bh 200,000.00
Kran Air Bh 62,000.00
Pintu WC Bh 250,000.00
Tarikan dan Kunci Bh 150,000.00
Tarikan Jendela Bh 13,500.00
Engsel Bh 15,000.00
Daun Pintu Kayu Lbr 500,000.00

B ALAT
1 Cangkul Bh 82,800.00
2 Sekop Bh 132,500.00
3 Ember Bh 11,200.00
4 Benang Bh 5,500.00
5 Sendok Tembok Bh 27,600.00
6 Linggis Bh 127,000.00
7 Belincong Bh 209,800.00
9 Palu Besar Bh 115,900.00
10 Palu Kecil Bh 49,700.00
11 Pengki Bh 33,400.00
12 Sewa mesin Molen Hari 276,100.00
13 Sewa Mesin Gilas / Stoom Walles Jam 331,300.00
14 Mobilisasi & Demobilisasi Alat Ls 4,000,000.00

C UPAH
1 Pekerja OH 70,000.00
2 Tukang OH 90,000.00
3 Mandor OH 100,000.00

** Harga Satuan Sudah Termasuk PPN dan PPh Pelasana Kegiatan


Kasi Kesejahteraan

aaaaaaaaaaaaa
PERHITUNGAN VOLUME

Desa : Kadu
Kecamatan : Jatigede
Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Pembangunan Tembok Penahan Tanah
Lokasi :
Sumber Dana : Dana Desa
Tahun : 2022

Total Panjang : 0.00 m


VOLUME
NO GAMBAR SKET PERHITUNGAN GALIAN TANAH PAS. BATU PESTERAN
Timbunan Tanah
BIASA 1: 4 1:3

1 POTONGAN A - A
Galian Tanah Biasa
1 x x 36.30 = 0.00

0.00

Pasangan Batu Ad. Pc 1 : 4


0.50 x 0.40 = 0.20

0.30 + 0.80 x 0.90 = 0.50


2

∑F 0.695 m²

Volume = 0.695 x 36.30 = 25.23 25.23

Plesteran Ad 1 Pc : 2 Ps
1 0.4 x 36.30 = 14.52 14.52

Timbunan Tanah

+ x 36.30 = 0.00 0.00


2

0.00 25.23 14.52 0.00


PERHITUNGAN VOLUME

Desa : Kadu
Kecamatan : Jatigede
Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Pembangunan Tembok Penahan Tanah
Lokasi :
Sumber Dana : Dana Desa
Tahun : 2022

Total Panjang : 0.00 m


VOLUME
NO GAMBAR SKET PERHITUNGAN GALIAN TANAH PAS. BATU PESTERAN
Timbunan Tanah
BIASA 1: 4 1:3

0.00 25.23 14.52 0.00


PERHITUNGAN VOLUME

Desa : Kadu
Kecamatan : Jatigede
Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Pembangunan Tembok Penahan Tanah
Lokasi :
Sumber Dana : Dana Desa
Tahun : 2022

Total Panjang : 0.00 m


VOLUME
NO GAMBAR SKET PERHITUNGAN GALIAN TANAH PAS. BATU PESTERAN
Timbunan Tanah
BIASA 1: 4 1:3

0.00 25.23 14.52 0.00

0.00 25.23 14.52 0.00

2
PERHITUNGAN VOLUME

Desa : Kadu
Kecamatan : Jatigede
Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Pembangunan Tembok Penahan Tanah
Lokasi :
Sumber Dana : Dana Desa
Tahun : 2022

Total Panjang : 0.00 m


VOLUME
NO GAMBAR SKET PERHITUNGAN GALIAN TANAH PAS. BATU PESTERAN
Timbunan Tanah
BIASA 1: 4 1:3

0.00 25.23 14.52 0.00

0.00 25.23 14.52 0.00

4 POTONGAN D - D
PERHITUNGAN VOLUME

Desa : Kadu
Kecamatan : Jatigede
Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Pembangunan Tembok Penahan Tanah
Lokasi :
Sumber Dana : Dana Desa
Tahun : 2022

Total Panjang : 0.00 m


VOLUME
NO GAMBAR SKET PERHITUNGAN GALIAN TANAH PAS. BATU PESTERAN
Timbunan Tanah
BIASA 1: 4 1:3

0.00 25.23 14.52 0.00


DAFTAR PERHITUNGAN BAHAN DAN UPAH
DESA KADU KECAMATAN JATIGEDE
KABUPATEN SUMEDANG
TAHUN ANGGARAN 2022

A.2.3.1.1
Penggalian 1 M³ Galian Tanah Biasa Sedalam 1 M
Jumlah
No. Uraian Kode Satuan Koefisien Volume
Kebutuhan

A Tenaga Kerja
1 Pekerja L.01 hok 0.7500 - -

A.2.3.1.10
Pemadatan Tanah 1 M³ Tanah (per 20 Cm)
Jumlah
No. Uraian Kode Satuan Koefisien Volume
Kebutuhan

A Tenaga Kerja
1 Pekerja L.01 hok 0.5000 - -

A.3.2.1.2
Pemasangan 1 M³ Pondasi Batu Belah Campuran 1SP : 4PP
Jumlah
No. Uraian Kode Satuan Koefisien Volume
Kebutuhan

A Tenaga Kerja
1 Pekerja L.01 hok 1.5000 25.23 37.85
2 Tukang Batu L.02 hok 0.7500 25.23 18.92

B Bahan
1 Batu Belah m³ 1.200 25.23 30.28
2 Semen 50 Kg M.15 zak 3.260 25.23 82.25
3 Pasir Pasang M.14.b m³ 0.520 25.23 13.12

A.4.4.2.3
Pemasangan 1 M² Plesteran 1SP : 3PP Tebal 15 Mm
Jumlah
No. Uraian Kode Satuan Koefisien Volume
Kebutuhan

A Tenaga Kerja
1 Pekerja L.01 hok 0.3000 14.52 4.36
2 Tukang Batu L.02 hok 0.1500 14.52 2.18

B Bahan
1 Semen 50 Kg M.15 zak 0.1555 14.52 2.26
2 Pasir Pasang M.14.b m³ 0.0230 14.52 0.33
REKAPITULASI KEBUTUHAN BAHAN, ALAT DAN UPAH

BAHAN
1 Batu Belah = 30.276 ~ 30.000 m³

2 Pasir Pasang = 13.454 ~ 13.000 m³

3 Semen 50 Kg = 84.508 ~ 85.000 zak

4 Bambu = 3.154 ~ 3.000 btg

ALAT
1 Ember = 20.000 ~ 20.000 bh

2 Benang = 6.000 ~ 6.000 bh

3 Cangkul = 2.000 ~ 4.000 bh

4 Pengki = 5.000 ~ 5.000 bh

UPAH
1 Tukang / Buruh Terlatih = 21.101 ~ 21.000 hok

2 Pekerja / Buruh Tak Terlatih = 42.201 ~ 42.000 hok


RENCANA ANGGARAN BIAYA (RAB)
DESA KADU KECAMATAN JATIGEDE
TAHUN ANGGARAN 2022

No.RAB :
Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Pekerjaan Tembok Penahan Tanah
Waktu Pelaksanaan : 2 Hari kerja
Lokasi : 0
Volume : 0.00 m3

Harga Satuan Jumlah Total


No. URAIAN Volume Satuan
Rp Rp
1 2 3 4 5 6=5x3
1 Belanja Barang dan Jasa
a. Biaya Lain-lain :

- Pembuatan Papan Kegiatan 1.00 paket Rp 100,000 Rp 100,000

b. Pekerja 8.00 Hok Rp 85,000 Rp 680,000


c. Tukang 2.00 Hok Rp 110,000 Rp 220,000
d. Oprasional TPK 1.00 ls Rp 1,750,000 Rp 1,750,000
e.
f. Sub Total (1) Rp 2,750,000
Belanja Modal

Toren 1.00 buah Rp 3,050,000 Rp 3,050,000.00


2 pipa pvc 2" 264.00 meter Rp 12,500 Rp 3,300,000.00
lem pipa 3.00 kg Rp 103,000 Rp 309,000.00
tee 2" 10.00 roll Rp 35,000 Rp 350,000.00
seal tape 5 buah Rp2,800.00 Rp 14,000.00
knie 10 Rp25,000.00 Rp 250,000.00

Sub Total (2 ) Rp 7,273,000


TOTAL RAB Rp 10,023,000
DIBULATKAN Rp 10,023,000

Diverifikasi oleh:
Kepala UPTD................... Pelaksana Kegiatan
Wil. ....................... Ketua TPK

......................................... .........................................

Disetujui/mengesahkan :
Kepala Desa
MEKARWANGI

XXIII. FORMAT RENCANA ANGGARAN DAN BIAYA (RAB)

.........................................
RENCANA ANGGARAN BIAYA (RAB)

DESA : ……………….…………………………………..……………………...
KECAMATAN : …………………………………………...… No.RAB : ……...……..………………
RENCANA ANGGARAN BIAYA
DESA KADU KECAMATAN JATIGEDE
TAHUN ANGGARAN 2017

Bidang : Pembangunan Desa


Kegiatan : Tembok Penahan Tanah
#REF! : #REF!
Pagu Anggaran : #NAME?
Waktu Pelaksanaan : 45 Hari Kalender
Rincian Pendanaan : Dana Desa

HARGA
JUMLAH
NO URAIAN VOLUME SATUAN SATUAN
( Rp ) ( Rp )
Tembok Penahan Tanah
1 Belanja Barang dan Jasa 12,183,000
1.1. Honorarium Panitia
- Penanggungjawab 1.00 orang 1,250,000 1,250,000
- Ketua Pelaksana 1.00 orang 1,000,000 1,000,000
- Sekretaris 1.00 orang 900,000 900,000
- Anggota Pelaksana Kegiatan 2.00 orang 850,000 1,700,000

1.2. Upah Tenaga Kerja


- Tukang / Buruh Terlatih 21.00 hok 90,000 1,890,000
- Pekerja / Buruh tak terlatih 42.00 hok 70,000 2,940,000

1.3. Biaya Perencanaan


- ATK ( Alat Tulis Kantor ) 1.00 paket 150,000 150,000
- Survey 1.00 ls 263,000 263,000
- Gambar 1.00 ls 495,000 495,000
- Rencana Anggaran Biaya 1.00 ls 495,000 495,000
- Pembuatan Papan Kegiatan 1.00 paket 100,000 100,000
- Dokumentasi 1.00 paket 100,000 100,000
- Pembuatan Laporan Kegiatan 1.00 paket 400,000 400,000
- Prasasti 1.00 bh 500,000 500,000

2 Belanja Modal #NAME?


Batu Belah 30.00 m³ 250,000 7,500,000
Pasir Pasang 13.00 m³ 265,000 3,445,000
Semen 50 Kg 85.00 zak 74,500 6,332,500
Bambu 3.00 btg 10,000 30,000
#NAME? #NAME? btg 33,200 #NAME?
#NAME? #NAME? #NAME? 15,000 #NAME?
#NAME? #NAME? #NAME? 5,000 #NAME?
#NAME? #NAME? btg 82,500 #NAME?
#NAME? #NAME? #NAME? 25,000 #NAME?
#NAME? #NAME? #NAME? 300,000 #NAME?
#NAME? #NAME? #NAME? 250,000 #NAME?
#NAME? #NAME? btg 682,600 #NAME?
Ember 20.00 bh 11,200 224,000
Benang 6.00 bh 5,500 33,000
Cangkul 4.00 bh 82,800 331,200
Pengki 5.00 bh 33,400 167,000

JUMLAH RENCANA ANGGARAN BIAYA Rp. #NAME?


DIBULATKAN Rp. #NAME?

Terbilang : #NAME?

Borogojol,................................2017
Disetujui / Mengesahkan
Kepala Desa Pelasana Kegiatan
Borogojol Kasi Ekbang

EVI MUSAFFA TOTO SUJANA

Anda mungkin juga menyukai