Anda di halaman 1dari 13

DAFTAR HARGA BARANG DAN UPAH

No Nama barang Satuan Harga


I HARGA UPAH
1 Pekerja OH 100,000.00
2 Tukang OH 150,000.00
3 Kepala tukang OH 175,000.00
4 Mandor OH 200,000.00
II HARGA BAHAN
A Bahan Material
1 Pasir beton m3 125,000.00
2 Semen Portland Kg 1,800.00
3 Semen warna Kg 9,700.00
4 Kerikil m3 425,000.00
5 Pasir Pasang m3 125,000.00
6 Batu split m3 445,000.00
7 Pasir Urug m3 95,000.00
8 Tanah Urug m3 60,000.00
9 Batu Bata Bolong bh 650.00
10 Kayu papan 3/20 Kelas IV M3 1,600,000.00
11 Minyak bekesting Ltr 11,500.00
12 Dolken kayu diameter 8-10/400 cm Btg 9,000.00
13 Kayu kelas III m3 4,300,000.00
14 Pipa Galvanis 4" Btg 265,000.00
15 Pipa Galvanis 3" Btg 425,000.00
16 Cat Khusus Lapangan Kg 56,000.00
17 Cat Dasar Kg 35,000.00
18 Thinner Ltr 35,000.00
19 Menie kg 46,100.00
20 Plamir Kg 15,500.00
21 Cat penutup kg 38,000.00
22 Paku Kg 18,500.00
23 Besi beton Kg 12,500.00
24 Kawat beton Kg 25,000.00
25 Kuas "2 Bh 15,000.00
26 Kuas "4 Bh 17,500.00
27 Kabel 2 X 2.5 NYM M' 10,500.00
28 Lampu sorot 50 watt Led Bh 67,500.00
29 Plywood 4 mm lbr 70,000.00
30 Plywood 9 mm lbr 130,000.00
31 Profil alumunium m' 55,000.00
32 Kaca Tempered 12 mm m2 900,000.00
33 Floor hinges set 1,750,000.00
34 Overpanel set 950,000.00
35 Top patch fitting set 650,000.00
36 Bottom patch fitting set 650,000.00
37 Bottom patch lock + cylinder set 1,250,000.00
38 Pull handle set 2,250,000.00
39 Baut Baja 17mm Bh 7,000.00
40 Granite tile tekstur uk. 60x60 cm Bh 155,000.00
41 Keramik lantai Kamar mandi uk. 40x40cm Bh 13,700.00
42 Ornamen GRC m2 925,000.00
ANALISA HARGA SATUAN PEKERJAAN

1 Pekerjaan 1 M2 Pembersihan dan Perataan Lapangan


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
B. Tenaga
0.100 Oh Pekerja 100,000.00 10,000.00
0.050 Oh Mandor 200,000.00 10,000.00
Jumlah Tenaga 20,000.00

C. Jumlah Bahan dan Tenaga (A+B) 20,000.00


D. Overhead & Profit 10 % x C 2,000.00
E. Harga Satuan Pekerjaan (C+D) 22,000.00

2 1 m' PENGUKURAN DAN PASANG BOUWPLANK


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
0.012 m3 Kayu balok 5/7 klas IV 1,600,000.00 19,200.00
0.020 m3 Paku biasa 18,500.00 370.00
0.007 m3 Kayu papan 3/20 klas IV 1,600,000.00 11,200.00
Jumlah Bahan 30,770.00
B. Tenaga
0.100 Oh Pekerja 100,000.00 10,000.00
0.100 Oh Tukang 150,000.00 15,000.00
0.010 Oh Kepala Tukang 175,000.00 1,750.00
0.005 Oh Mandor 200,000.00 1,000.00
Jumlah Tenaga 27,750.00

C. Jumlah Bahan dan Tenaga (A+B) 58,520.00


D. Overhead & Profit 15 % x C 8,778.00
E. Harga Satuan Pekerjaan (C+D) 67,298.00

3 Menggali 1 M3 Tanah biasa sedalam 1 m'


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
B. Tenaga
0.750 Oh Pekerja 100,000.00 75,000.00
0.025 Oh Mandor 200,000.00 5,000.00
Jumlah Tenaga 80,000.00

C. Jumlah Bahan dan Tenaga (A+B) 80,000.00


D. Overhead & Profit 10 % x C 8,000.00
E. Harga Satuan Pekerjaan (C+D) 88,000.00
4 Mengurug / Timbunan 1 M3 Tanah
No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
1.200 m3 Tanah Urug 60,000.00 72,000.00
-
Jumlah Bahan 72,000.00
B. Tenaga
0.250 Oh Pekerja 100,000.00 25,000.00
0.025 Oh Mandor 200,000.00 5,000.00
Jumlah Tenaga 30,000.00

C. Jumlah Bahan dan Tenaga (A+B) 102,000.00


D. Overhead & Profit 15 % x C 15,300.00
E. Harga Satuan Pekerjaan (C+D) 117,300.00

5 1 M3 Urugan Kembali Galian tanah


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
-
-
Jumlah Bahan -
B. Tenaga
0.250 Oh Pekerja 100,000.00 25,000.00
0.008 Oh Mandor 200,000.00 1,600.00
Jumlah Tenaga 26,600.00

C. Jumlah Bahan dan Tenaga (A+B) 26,600.00


D. Overhead & Profit 10 % x C 2,660.00
E. Harga Satuan Pekerjaan (C+D) 29,260.00

6 1 M3 Urugan Pasir Urug


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
1.200 m3 Pasir Urug 95,000.00 114,000.00
-
Jumlah Bahan 114,000.00
B. Tenaga
0.300 Oh Pekerja 100,000.00 30,000.00
0.010 Oh Mandor 200,000.00 2,000.00
Jumlah Tenaga 32,000.00

C. Jumlah Bahan dan Tenaga (A+B) 146,000.00


D. Overhead & Profit 15 % x C 21,900.00
E. Harga Satuan Pekerjaan (C+D) 167,900.00
7 1 m' Pasang Res Batu Bata Lobang 1 Sp : 3 PP
No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
12.000 bh Batu bata lobang 650.00 7,800.00
5.180 kg Semen PC 1,800.00 9,324.00
0.058 m3 Pasir Pasang 125,000.00 7,250.00
Jumlah Bahan 24,374.00
B. Tenaga
0.395 Oh Pekerja 100,000.00 39,500.00
0.125 Oh Tukang 150,000.00 18,750.00
0.006 Oh Kepala Tukang 175,000.00 1,050.00
0.005 Oh Mandor 200,000.00 1,000.00
Jumlah Tenaga 60,300.00

C. Jumlah Bahan dan Tenaga (A+B) 84,674.00


D. Overhead & Profit 15 % x C 12,701.10
E. Harga Satuan Pekerjaan (C+D) 97,375.10

Pasang 1m2 dinding bata bolong (8x8x18) cm tebal ½ batu campuran 1SP : 3 PP
Bahan
66.000 bh Batu bata lobang 650.00 42,900.000
7.832 kg Semen PC 1,800.00 14,097.600
0.022 m3 Pasir Pasang 125,000.00 2,750.000
Jumlah Bahan 59,747.600
B. Tenaga
0.300 Oh Pekerja 100,000.00 30,000.000
0.100 Oh Tukang 150,000.00 15,000.000
0.010 Oh Kepala Tukang 175,000.00 1,750.000
0.015 Oh Mandor 200,000.00 3,000.000
Jumlah Tenaga 49,750.000

C. Jumlah Bahan dan Tenaga (A+B) 109,497.600


D. Overhead & Profit 15 % x C 16,424.640
E. Harga Satuan Pekerjaan (C+D) 125,922.240

13 Pekerjaan 1 m2 plesteran 1SP : 3PP tebal 20 mm


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
10.368 kg Semen PC 1,800.00 18,662.40
0.031 m3 Pasir Pasang 125,000.00 3,875.00
Jumlah Bahan 22,537.40
B. Tenaga
0.260 Oh Pekerja 100,000.00 26,000.00
0.200 Oh Tukang 150,000.00 30,000.00
0.020 Oh Kepala Tukang 175,000.00 3,500.00
0.013 Oh Mandor 200,000.00 2,600.00
Jumlah Tenaga 62,100.00

C. Jumlah Bahan dan Tenaga (A+B) 84,637.40


D. Overhead & Profit 15 % x C 12,695.61
E. Harga Satuan Pekerjaan (C+D) 97,333.01
18 Pemasangan 1 M2 Granite tile motif 60.60 cm
No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
3.050 bh Granite tile 155,000.00 472,750.00
9.600 kg Semen portland 1,800.00 17,280.00
0.045 kg Pasir Pasang 125,000.00 5,625.00
1.620 kg Semen Warna 9,700.00 15,714.00
Jumlah Bahan 511,369.00
B. Tenaga
0.250 Oh Pekerja 100,000.00 25,000.00
0.125 Oh Tukang Batu 150,000.00 18,750.00
0.013 Oh Kepala Tukang 175,000.00 2,275.00
0.013 Oh Mandor 200,000.00 2,600.00
Jumlah Tenaga 48,625.00
C. Jumlah Bahan dan Tenaga (A+B) 559,994.00
D. Overhead & Profit 15 % x C 83,999.10
E. Harga Satuan Pekerjaan (C+D) 643,993.10

17 Pemasangan 1 m2 dinding panel GRC


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
1.100 m2 Ornamen GRC 925,000.00 1,017,500.00
11.000 kg Semen portland 1,800.00 19,800.00
0.060 m3 Pasir Pasang 125,000.00 7,500.00
Jumlah Bahan 1,044,800.00
B. Tenaga
1.400 Oh Pekerja 100,000.00 140,000.00
2.300 Oh Tukang Batu 150,000.00 345,000.00
0.050 Oh Kepala Tukang 175,000.00 8,750.00
0.015 Oh Mandor 200,000.00 3,000.00
Jumlah Tenaga 496,750.00
C. Jumlah Bahan dan Tenaga (A+B) 1,541,550.00
D. Overhead & Profit 15 % x C 231,232.50
E. Harga Satuan Pekerjaan (C+D) 1,772,782.50
10 1 M3 Rabat Beton + acian lantai
No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
336.000 kg Semen PC 1,800.00 604,800.00
1.154 m3 Pasir beton 125,000.00 144,250.00
Jumlah Bahan 749,050.00
B. Tenaga
5.300 Oh Pekerja 100,000.00 530,000.00
0.275 Oh Tukang Batu 150,000.00 41,250.00
0.262 Oh Kepala Tukang 175,000.00 45,850.00
0.265 Oh Mandor 200,000.00 53,000.00
Jumlah Tenaga 670,100.00

C. Jumlah Bahan dan Tenaga (A+B) 1,419,150.00


D. Overhead & Profit 15 % x C 212,872.50
E. Harga Satuan Pekerjaan (C+D) 1,632,022.50

11 1 M3 Beton Lantai Bertulang + Bekesting


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
0.270 m3 Kayu klas IV 1,600,000.00 432,000.00
2.000 kg Paku biasa 18,500.00 37,000.00
0.600 ltr Minyak bekesting 11,500.00 6,900.00
336.000 kg Semen PC 1,800.00 604,800.00
0.540 m3 Pasir beton 125,000.00 67,500.00
120.000 Kg Besi Beton 12,500.00 1,500,000.00
0.810 m3 Batu Split 445,000.00 360,450.00
Jumlah Bahan 3,008,650.00
B. Tenaga
5.650 Oh Pekerja 100,000.00 565,000.00
0.275 Oh Tukang Batu 150,000.00 41,250.00
1.560 Oh Tukang Kayu 150,000.00 234,000.00
0.323 Oh Kepala Tukang 175,000.00 56,525.00
0.283 Oh Mandor 200,000.00 56,600.00
Jumlah Tenaga 953,375.00

C. Jumlah Bahan dan Tenaga (A+B) 3,962,025.00


D. Overhead & Profit 15 % x C 594,303.75
E. Harga Satuan Pekerjaan (C+D) 4,556,328.75

1 M3 Beton bertulang SLOOF


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
0.270 m3 Kayu Klas IV 1,600,000.00 432,000.00
2.000 kg Paku 5-12 cm 18,500.00 37,000.00
0.600 liter Minyak bekisting 11,500.00 6,900.00
100.000 kg Besi beton polos 12,500.00 1,250,000.00
2.250 kg Kawat beton 25,000.00 56,250.00
336.000 kg Semen PC 1,800.00 604,800.00
0.540 m3 Pasir Beton 125,000.00 67,500.00
0.810 m3 Kerikil 425,000.00 344,250.00
Jumlah Bahan 2,798,700.00
B. Tenaga
5.650 oh Pekerja 100,000.00 565,000.00
0.275 oh Tukang Batu 150,000.00 41,250.00
1.560 oh Tukang Kayu 150,000.00 234,000.00
1.400 oh Tukang Besi 150,000.00 210,000.00
0.323 oh Kepala Tukang 175,000.00 56,525.00
0.283 oh Mandor 200,000.00 56,600.00
Jumlah Tenaga 1,163,375.00

C. Jumlah Bahan dan Tenaga (A+B) 3,962,075.00


D. Overhead & Profit 15 % x C 594,311.25
E. Harga Satuan Pekerjaan (C+D) 4,556,386.25

1 M3 Beton bertulang KOLOM (150 Kg + Bekesting)


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
0.320 m3 Kayu Kelas 1,600,000.00 512,000.00
3.200 kg Paku 5-12 cm 18,500.00 59,200.00
1.600 liter Minyak bekisting 11,500.00 18,400.00
150.000 kg Besi beton polos 12,500.00 1,875,000.00
2.250 kg Kawat beton 25,000.00 56,250.00
336.000 kg Semen PC 1,800.00 604,800.00
0.540 m3 Pasir Beton 125,000.00 67,500.00
0.810 Kg Kerikil 425,000.00 344,250.00
0.120 m3 Kayu Kelas Balok 1,600,000.00 192,000.00
2.800 Lbr Plywood 9 mm 130,000.00 364,000.00
32.000 Batang Dolken kayu Ø8-10 cm pj 4 m 9,000.00 288,000.00
Jumlah Bahan 4,381,400.00
B. Tenaga
5.300 oh Pekerja 100,000.00 530,000.00
0.275 oh Tukang Batu 150,000.00 41,250.00
1.300 oh Tukang Kayu 150,000.00 195,000.00
1.050 oh Tukang Besi 150,000.00 157,500.00
0.265 oh Kepala Tukang 175,000.00 46,375.00
0.265 oh Mandor 200,000.00 53,000.00
Jumlah Tenaga 1,023,125.00

C. Jumlah Bahan dan Tenaga (A+B) 5,404,525.00


D. Overhead & Profit 15 % x C 810,678.75
E. Harga Satuan Pekerjaan (C+D) 6,215,203.75
12 1 M2 Pengecatan dengan Cat Minyak
No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
0.180 kg Cat Dasar 35,000.00 6,300.00
0.126 ltr Thiner 35,000.00 4,410.00
0.098 Bh Kuas "2 15,000.00 1,470.00
0.098 Bh Kabel 2 X 2.5 NYM 17,500.00 1,715.00
0.260 kg Cat Minyak / Penutup 56,000.00 14,560.00
Jumlah Bahan 28,455.00
B. Tenaga
0.020 Oh Pekerja 100,000.00 2,000.00
0.063 Oh Tukang 150,000.00 9,450.00
0.006 Oh Kepala Tukang 175,000.00 1,050.00
0.003 Oh Mandor 200,000.00 600.00
Jumlah Tenaga 13,100.00
C. Jumlah Bahan dan Tenaga (A+B) 41,555.00
D. Overhead & Profit 15 % x C 6,233.25
E. Harga Satuan Pekerjaan (C+D) 47,788.25

Pengecatan 1 m2 tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
0.100 kg Plamir 15,500.00 1,550.00
0.100 Kg Cat dasar 35,000.00 3,500.00
0.2600 Kg Cat Penutup 38,000.00 9,880.00
Jumlah Bahan 14,930.00
B. Tenaga
0.0200 Oh Pekerja 100,000.00 2,000.00
0.0630 Oh Tukang Terampil 150,000.00 9,450.00
0.0063 Oh Kepala tukang 175,000.00 1,102.50
0.0030 Oh Mandor 200,000.00 600.00
Jumlah Tenaga 13,152.50

C. Jumlah Bahan dan Tenaga (A+B) 28,082.50


D. Overhead & Profit 15 % x C 4,212.38
E. Harga Satuan Pekerjaan (C+D) 32,294.88

1 Unit Pasang Lampu penerangan


No. Koeff Sat. Uraian Harga Sat. (Rp). Juml. Harga (Rp).
A. Bahan
1.000 Btg Pipa Besi Galvanis 3" 265,000.00 265,000.00
2.000 BH Lampu sorot 67,500.00 135,000.00
20.000 Bh Kabel 2 x 2.5 10,500.00 210,000.00
Jumlah Bahan 610,000.00
B. Tenaga
1.020 Oh Pekerja 100,000.00 102,000.00
0.930 Oh Tukang Listrik 150,000.00 139,500.00
0.006 Oh Kepala Tukang 175,000.00 1,050.00
0.003 Oh Mandor 200,000.00 600.00
Jumlah Tenaga 243,150.00
C. Jumlah Bahan dan Tenaga (A+B) 853,150.00
D. Overhead & Profit 15 % x C 127,972.50
E. Harga Satuan Pekerjaan (C+D) 981,122.50
-
700,000,000.00
RENCANA ANGGARAN BIAYA

VOLUME SAT HARGA SATUAN


NO URAIAN PEKERJAAN
PEK. PEK. (Rp.)
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pembersihan 1.000 ls 250,000.00
2 Pengadaan air kerja 1.000 ls 150,000.00
3 Penebangan batang 1.000 ls 4,500,000.00
Sub jumlah
II PEKERJAAN TANAH
1 Pek. Galian Tanah 6.450 m3 88,000.00
2 Pek. Timbunan Dan Perataan 5.650 m3 117,300.00
Sub jumlah
III PEKERJAAN BETON
1 Pek. Cor beton Lantai Kerja T 10 cm 12.180 m3 4,556,328.75
2 Pek. Rabat beton dan Acian lantai Rabat 3.350 m3 1,632,022.50
Sub jumlah
IV PEKERJAAN PASANGAN
1 Pek. Pasang Ris Bata 49.400 m' 97,375.10
2 Pek. Pasang Tiang net (knockdown) 2.000 Btg 210,000.00
3 Pek. Pasang Pagar teralis besi Terpasang 19.440 m2 475,000.00
4 Pasang Lampu Penerangan 2.000 Unit 981,122.50
Sub jumlah
V PEKERJAAN PENGECATAN
1 Pek Pengecatan (Cat khusus lapangan) 127.020 m2 47,788.25
2 Pek cat Garis (Line) 5.190 m2 47,788.25
3 Pek cat Minyak Pagar 15.250 m2 47,788.25
Sub jumlah
VI PEKERJAAN AKHIR
1 Pembersihan Akhir 1.000 ls 200,000.00
2 Pelaporan dan dokumentasi 1.000 ls 150,000.00
Sub Jumlah

TOTAL
PPN 10%
JUMLAH SESUDAH PPN
JUMLAH HARGA
(Rp.)

250,000.00
150,000.00
4,500,000.00
4,900,000.00

567,600.00
662,745.00
1,230,345.00

55,496,084.18
5,467,275.38
60,963,359.55

4,810,329.94
420,000.00
9,234,000.00
1,962,245.00
16,426,574.94

6,070,063.52
248,021.02
728,770.81
7,046,855.35

200,000.00
150,000.00
350,000.00

90,917,134.84
9,091,713.48
100,008,848.32
REKAPITULASI

PEKERJAAN
LOKASI
TAHUN ANGGARAN
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
III PEKERJAAN BETON
IV PEKERJAAN PASANGAN
V PEKERJAAN PENGECATAN
VI PEKERJAAN AKHIR
TOTAL -
PPN 10% -
JUMLAH SESUDAH PPN 10% -
DIBULATKAN -

Terbilang

Disetujui ,
Pejabat Pembuat Komitmen
( PPK )

NIP.
VOLUME SAT REALISASI
NO URAIAN PEKERJAAN
PEK. PEK. (%)
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pembersihan 1.000 ls 100.00
2 Pengadaan air kerja 1.000 ls 100.00
3 Penebangan batang 1.000 ls 100.00
II PEKERJAAN TANAH
1 Pek. Galian Tanah 6.450 m3 100.00
2 Pek. Timbunan Dan Perataan 5.650 m3 100.00
III PEKERJAAN BETON
1 Pek. Cor beton Lantai Kerja T 10 cm 12.180 m3 100.00
2 Pek. Rabat beton dan Acian lantai Rabat 3.350 m3 100.00
IV PEKERJAAN PASANGAN
1 Pek. Pasang Ris Bata 49.400 m' 100.00
2 Pek. Pasang Tiang net (knockdown) 2.000 Btg 100.00
3 Pek. Pasang Pagar teralis besi Terpasang 19.440 m2 100.00
4 Pasang Lampu Penerangan 2.000 Unit 100.00
V PEKERJAAN PENGECATAN
1 Pek Pengecatan (Cat khusus lapangan) 127.020 m2 100.00
2 Pek cat Garis (Line) 5.190 m2 100.00
3 Pek cat Minyak Pagar 15.250 m2 100.00
VI PEKERJAAN AKHIR
1 Pembersihan Akhir 1.000 ls 100.00
2 Pelaporan dan dokumentasi 1.000 ls 100.00

Anda mungkin juga menyukai