Anda di halaman 1dari 78

HARGA SATUAN

BAHAN BANGUNAN DAN UPAH PEKERJA

No Uraian Satuan Harga (Rp) Keterangan


1 2 3 4 5
A HARGA UPAH PEKERJA :
1 Mandor Hari 125,000.00
2 Kepala Tukang Hari 120,000.00
3 Tukang Hari 100,000.00
4 Tukang Batu Hari 120,000.00
5 Tukang Besi Hari 120,000.00
6 Tukang Cat Hari 120,000.00
7 Tukang Kayu Hari 100,000.00
8 Tukang Pipa Hari 120,000.00
9 Tukang Khusus Allumunium Hari 120,000.00
10 Tukang Las Biasa Hari 100,000.00
11 Tukang Las Konstruksi Hari 100,000.00
12 Pekerja Hari 90,000.00
13 Instalatur Listrik Hari 150,000.00
14 Asisten Instalatur Listrik Hari 125,000.00

B HARGA BAHAN BANGUNAN:


1 Air Liter 100.00
2 Amplas Lembar 11,000.00
3 Batu bata Buah 400.00
4 Batu Belah Hitam Utk Pondasi M3 200,000.00
5 Baut HTB M16 bh 30,000.00
6 Baut HTB M20 bh 32,000.00
7 Besi Profil Kg 21,000.00
8 Besi Baja IWF Kg 21,000.00 SELISIH 3000
9 Besi Beton (Polos/Ulir) Kg 11,000.00
10 Reservoir Tower Air Fiber 1 M3 bh 1,650,000.00
11 Reservoir Tower Air Fiber 2 M3 bh 2,500,000.00
12 Batu Alam Andesit M2 160,500.00
13 Box Zekering/ Termis 2 Group Buah 180,000.00
14 Box Zekering/ Termis 3 Group Buah 180,000.00
15 Bubungan Bulat Genteng Zincalume polos M 24,000.00
16 Cat Alkali kg 60,000.00
17 Cat Dasar Kg 70,000.00
18 Cat Penutup Interior Kg 80,000.00
19 Cat Penutup Eksterior Kg 150,000.00
20 Cat Kayu/Besi Kg 70,000.00
21 Cat Meni kayu/besi Kg 45,000.00
22 Cat Tembok Kg 71,250.00 CAT EKS KLS I WARNA
23 Compound Kg 20,000.00
24 Cotton Plaster Kg 65,000.00
25 Engsel Jendela Buah 35,000.00
26 Engsel Pintu Buah 45,000.00
27 Exhaust Plafond Buah 300,000.00
28 Folding Door Galvalum 0,5mm m2 550,000.00
29 Fitting Lampu bh 20,000.00
No Uraian Satuan Harga (Rp) Keterangan
1 2 3 4 5
30 Spandek Metal Zincalume L=6m T=0,35mm M2 68,000.00 SATUAN M2
31 Spandek Metal Pasir M2 74,800.00
32 Spandek Fibrealum Uk.6000x1050x1,5mm M2 125,000.00 SATUAN M2
33 Bondek Metal L=1m, T=0,75mm m2 135,000.00
34 Wiremesh Uk. 2,1x5,4m, D8mm lbr 679,000.00 SATUAN LBR
35 Genteng Metal Berpasir M2 63,000.00 SATUAN M2
36 Glass Block 20x20 Bh 25,000.00
37 Grab Bar Stainless Steel Bh 800,000.00
38 Grip Bar Stainless Steel 60cm Bh 135,000.00
39 Grip Bar Stainless Steel 50cm Bh 115,000.00
40 Granit Tile 60x60cm Bh 78,700.00
41 Granit Plint 10 x 60 cm Bh 14,583.00
42 Grendel Jendela Buah 20,000.00 TIDAK ADA
43 Grendel Pintu Buah 35,000.00
44 Grendel Pintu tanam Buah 124,000.00 TIDAK ADA
45 Grendel Pintu tanam alumunium Buah 124,000.00 TIDAK ADA
46 GRC 4 mm Lembar 50,000.00
47 GRC 8 mm Lembar 189,000.00 TEBAL 9mm
48 Gypsum Board tebal 9 mm Lembar 65,000.00
49 Besi Hollow Galvalum Btg 25,000.00
50 Hollow 2/4 Plafon Btg 17,000.00
51 Hak Angin / pengkait Buah 25,000.00
52 Huruf Stanlees Cm 37,000.00
53 HPL Panel Lbr 150,000.00
54 Ijuk IKAT 30,000.00 SATUAN IKAT
55 Isolasi bh 5,000.00
56 Kabel Listrik NYA 1 x 1,5 mm M' 3,000.00
57 Kabel Listrik NYA 1 x 2,5 mm M' 4,600.00
58 Kabel Listrik NYM 2 x 1,5 mm M' 7,000.00
59 Kabel Listrik NYM 2 x 2,5 mm M' 9,000.00
60 Kabel Listrik NYM 3 x 2,5 mm M' 15,000.00
61 Kaca Bening 5mm LBR 160,000.00 SATUAN LBR
62 Kaca Bening 8mm LBR 175,000.00 SATUAN LBR
63 Kaca Temperet 12mm LBR 750,000.00 SATUAN LBR
64 Kaca Es 3 mm LBR 105,000.00 SATUAN LBR
65 Kawat Beton Kg 22,000.00
66 Kayu Balok kelas I M3 7,500,000.00
67 Kayu Balok kelas II M3 3,000,000.00
68 Kayu Balok kelas III M3 2,000,000.00
69 Kayu Balok kelas IV M3 1,800,000.00
70 Kayu Papan kelas I M3 8,000,000.00
71 Kayu Papan kelas II M3 4,000,000.00
72 Kayu Papan kelas III M3 2,100,000.00
73 Kayu Papan kelas IV M3 1,800,000.00
74 Kayu kasau kelas II M3 3,000,000.00
75 Kayu kasau kelas III M3 2,000,000.00
76 Kayu kasau kelas IV M3 1,800,000.00
77 Kayu reng kelas II M3 4,000,000.00
78 Dolken kayu gelam φ(8-10) cm BH 25,000.00 SATUAN BH
79 Door closer bh 250,000.00
80 Kunci slot bh 95,000.00
No Uraian Satuan Harga (Rp) Keterangan
1 2 3 4 5
81 Door Holder bh 45,000.00
82 Door stop bh 45,000.00
83 Kayu perancah/begisting M3 1,500,000.00
84 Karpet Lantai setara Crown m2 250,000.00
85 Keramik 25/25 Kasar bh 3,750.00
86 Keramik 25/40 Warna bh 7,500.00 Rp 75,000.00 /m2
87 Keramik Motif Batu Alam 40/40 bh 13,333.33 Rp 80,000.00 /m2
88 Keramik 30/30 Warna bh 6,000.00 Rp 60,000.00 /m2
89 Keramik 30/30 Kasar bh 6,000.00 Rp 65,000.00 /m2
90 Keramik 40/40 Polos bh 11,875.00 Rp 65,000.00 /m2
91 Keramik 40/40 Warna bh 13,175.00 Rp 70,000.00 /m2
92 Keramik Plin 10 x 30 cm Buah 8,500.00
93 Keramik Plin 10 x 40 cm Buah 7,500.00
94 Kloset Jongkok Keramik Buah 350,000.00
95 Kloset Duduk Buah 1,950,000.00
96 Batu Split 1/2 cm m3 220,000.00
97 Kran air stainless Ø 1/2" Buah 70,000.00
98 Kran air stainless Ø 3/4" Buah 80,000.00
99 Kunci pintu kamar mandi Buah 95,000.00
100 Kunci Silinder Buah 178,000.00
101 Kunci tanam 2x putar Buah 95,000.00
102 Kuas cat Buah 25,000.00
103 Kusen Almunium 3"(coklat/hitam) m' 150,000.00
104 Profil Pintu Alumunium m 110,000.00
105 Pintu WC Almunium Buah 950,000.00
106 Pintu WC Fiber Buah 300,000.00
107 Profil Jendela Alumunium m 90,000.00
108 Pintu alluminium (Silver) m 100,000.00
109 Profil kaca m 9,500.00
110 Skrup fixer buah 850.00
111 Lampu Down Light Buah 57,000.00 3''
112 Lampu Downlight LED 9 Watt Buah 85,000.00 OUTBOW
113 Lampu LED. 11 watt Buah 50,000.00 10''
114 Lampu SL 18 Watt Buah 40,000.00
115 Lampu Strip Led m' 19,500.00 SLANG NEON LED
116 Lem Plastik / Kayu Kg 45,000.00
117 Lem PVC Buah 9,200.00
118 Lis Kayu Profil M' 15,000.00
119 List Gypsum 15 cm M' 20,000.00
120 Listplank GRC 20 cm LBR 50,000.00 SATUAN LBR
121 Mangkokan listrik (Durados) Buah 5,300.00
122 MCB 4 A bh 35,000.00
123 MCB 6 A bh 35,000.00
124 Minyak bekisting Liter 7,500.00
125 Paku 1 - 5 cm Kg 20,000.00
126 Paku 5 – 10 cm Kg 15,000.00
127 Paku GRC Kg 26,250.00
128 Paku Skrup KOTAK 50,000.00 SATUAN KOTAK
129 Paku Skrup (50bh/kg) KOTAK 50,000.00 SATUAN KOTAK
130 Paku Sekrup Plafond (1000 Bh / Kg) Kg 35,000.00
131 Paku Ramset buah 4,500.00
No Uraian Satuan Harga (Rp) Keterangan
1 2 3 4 5
132 Paku Triplek Kg 25,000.00
133 Pasir beton M3 250,000.00
134 Pasir beton (kg) M3 250,000.00 SATUAN M3
135 Pasir Pasang M3 150,000.00
136 Pasir Urug M3 150,000.00
137 Paving Block T = 6 Cm Buah 2,000.00
138 Pengencer/thinner Kg 19,000.00
139 Penjaga Jarak Begisting / Spacer buah 25,000.00
140 Pipa Galvanis Ø 2" BTG 460,000.00
141 Pipa PVC Ø 1/2" BTG 26,500.00 SATUAN BTG
142 Pipa PVC Ø 3/4" BTG 31,000.00 SATUAN BTG
143 Pipa PVC Ø 1" BTG 43,000.00 SATUAN BTG
144 Pipa PVC Ø 1,5" BTG 23,300.00 SATUAN BTG
145 Pipa PVC Ø 2" BTG 95,000.00 SATUAN BTG
146 Pipa PVC Ø 2 1/2" BTG 79,000.00 SATUAN BTG
147 Pipa PVC Ø 3" BTG 195,000.00 SATUAN BTG
148 Pipa PVC Ø 4" BTG 324,000.00 SATUAN BTG
149 Plamir kayu / besi Kg 50,000.00 SATUAN LITER
150 Plamir Tembok Kg 25,000.00
151 Plywood 9 mm Lembar 130,500.00
152 Profil U.75-06 btg 78,775.00 6 meter / batang
153 Profil Reng RT. 15 btg 29,900.00
154 Plat Perletakan Bh 3,588.00
155 Plat Sudut Bh 8,300.00
156 Pek. Plat Strip 5mm Bh 30,000.00
157 Pek. Plat 3mm Bh 25,000.00
158 Roster Beton Buah 25,000.00 Roster Beton 20/20
159 Saklar Double kualitas baik Buah 50,000.00
160 Saklar Single kualitas baik Buah 40,000.00
161 Saklar Triple kualitas baik Buah 60,000.00
162 Saringan Air / Floor drain stainless Buah 100,000.00
163 Sealant Tube 55,000.00
164 Seal tape Buah 5,000.00
165 Semen PC (50 Kg) KG 1,040.00 SATUAN KG
166 Semen portland KG 1,040.00 SATUAN KG
167 Semen warna Kg 2,000.00
168 Stiker Sunblast M2 100,000.00
169 Stop Kontak Buah 20,000.00
170 Stop Kontak AC Buah 45,000.00
171 Stop Kontak Lantai Buah 190,000.00
172 Stop Kran 3/4" Buah 30,000.00
173 Stop Kran 1" Buah 25,000.00
174 Talang jurai dalam Lapis Zinc Alumunium M' 70,000.00
175 Tanah Timbunan Biasa m3 37,500.00
176 Tanah Timbunan Pilihan m3 50,000.00
177 Tarikan Jendela Buah 20,000.00
178 Underlayer M2 85,000.00
179 Washtafel keramik lengkap unit 645,000.00
180 Wallpaper m 19,890.00 200000 / roll = 5.30 m2
No Uraian Pekerjaaan Keterangan Panjang (p)

1 Pekerjaan Galian Tanah Pondasi Batu


Sekat Tengah Vertikal 59.5 x
Horizontal 74.75 x
Teras Vertikal 18 x
Horizontal 31 x
Kamar Mandi Vertikal 1.75 x
Horizontal 1.25 x
Pondasi Tapak
K1 1.25 x
K2 1 x

2 Pekerjaan Timbunan sisa galian pondasi


Sekat Tengah Vertikal 59.5 x
Horizontal 74.75 x
Teras Vertikal 18 x
Horizontal 31 x
Kamar Mandi Vertikal 1.75 x
Horizontal 1.25 x
Pondasi Tapak
K1 1.25 x
K2 1 x

3 Pekerjaan Timbunan tanah peninggian lantai di padatkan


Selasar Depan 31 x

4 Pekerjaan Timbunan Pasir Bawah Lantai dan pondasi


Pondasi batu 186.25 x
Pondasi Tapak
K1 1.25 x
K2 1.00 x
lantai 31.00 x

5 Pekerjaan Batu kosong dan lantai kerja


Pondasi batu 136.50 x
Pondasi Tapak
K1 1.25 x
K2 1.00 x

6 Pek. Pasangan Pondasi Batu Belah Adk.1:4


Pondasi Batu 186.25 x

1 Pekerjaan Pondasi Tapak


Pek. Beton f’c = 21,7 MPa (K250) K1 1.25 +

K2 1.00 +

pembesian jumlah besi


K1 Sengkang Ø 16 - 150 2.8 x
K2 Sengkang Ø 16 - 150 2.4 x

bekisting
K1 1.25 +

K2 1 +

2 Pekerjaan Sloof 15/20


Pek. Beton f’c = 21,7 MPa (K250) pondasi 186.25 x

jumlah besi
pembesian Tulangan Utama 2 Ø 12 186.25 x
Sengkang Ø 16 - 150 0.75 x

bekisting 186.25 x

3 Pekerjaan Kolom K1
Pek. Beton f’c = 21,7 MPa (K250) 0.25 x

pembesian Tulangan Utama 10Ø 19 3.50 x


Sengkang Ø 10 - 125 0.95 x
bekisting vertkal 0.35 x
horizontal 0.25 x

4 Pekerjaan Kolom K2
Pek. Beton f’c = 21,7 MPa (K250) 0.25 x

jumlah besi
pembesian Tulangan Utama 8Ø 19 3.50 x
Sengkang Ø 8 - 125 0.9 x

bekisting vertkal 0.25 x

5 Pekerjaan Kolom K3
Pek. Beton f’c = 21,7 MPa (K250) 0.12 x

jumlah besi
pembesian Tulangan Utama 6Ø 12 3.50 x
Sengkang Ø 6 - 150 0.77 x

bekisting vertkal 0.25 x


horizontal 0.12 x

6 Pekerjaan Ring Balok 15/20


Pek. Beton f’c = 21,7 MPa (K250) 0.12 x

jumlah besi
pembesian Tulangan Utama 2Ø 12 122.00 x
Sengkang Ø 6 - 200 0.77 x

bekisting 122.00 x

7 Pekerjaan Balok Lantai


B1
Pek. Beton f’c = 21,7 MPa (K250) 12 x

jumlah besi
pembesian Tulangan Utama 6Ø 12 12.00 x
Sengkang Ø 8 - 200 1.25 x

bekisting 12.00 x

B2
Pek. Beton f’c = 21,7 MPa (K250) 118 x

jumlah besi
pembesian Tulangan Utama 4Ø 16 118.00 x
Sengkang Ø 8 - 200 1.05 x

bekisting 118.00 x

B3
Pek. Beton f’c = 21,7 MPa (K250) 31 x

jumlah besi
pembesian Tulangan Utama 4Ø 16 31.00 x
Sengkang Ø 8 - 200 1.05 x

bekisting 31.00 x

B4
Pek. Beton f’c = 21,7 MPa (K250) 133.5 x

jumlah besi
pembesian Tulangan Utama 4Ø 16 133.50 x
Sengkang Ø 8 - 200 1.05 x

bekisting 133.50 x
7 Pekerjaan Dak Tebal 12 cm
Pek. Beton f’c = 21,7 MPa (K250) 31 x
3 x

pembesian vertikal Ø 10 - 125 31 x


horizontal Ø 10 - 125 9 x

bekisting 31 x
3 x

1 Pek. Dinding Batu Bata adk. 1:4 Pas 1/2 Bata


Sekat Dinding 222 x
Kamar Mandi 1 3.25 x
Kamar Mandi 2 3.75 x
Kamar Mandi 3 3 x

Lubang Dinding Kusen


P2 2.5 x
P1 2.5 x
P1s 2.1 x
J3 1 x
J2 1.4 x
PKM 2 x
BV1 0.4 x
BV2 0.4 x
BV3 0.4 x

Volume Pas.Dinding
2 Pek. Plesteran Dinding adk. 1:4 701.90

Volume Pas.Dinding
3 Pek. Acian Dinding 701.90
1 Pek. Kusen Pintu dan Jendela Alumunium
P2 2.5
P1 2.5
P1s 2.1
J3 1
J2 1.4
PKM 2
BV1 0.4
BV2 0.4
BV3 0.4

2 Pek. Daun Pintu Alumunium+accesoris


P2 2.5 x
P1 2.5 x
P1s 2.1 x
PKM 2 x

3 Pek. Kaca Pintu Ryban 8 mm P2 2.5 x


P1 2.5 x

4 Pek. Daun Jendela Alumunium+accesoris J3 1 x


J2 1.4 x
BV1 0.4 x
BV2 0.4 x
BV3 0.4 x

5 Pek. Kaca Jendela Ryban 5 mm J3 1 x


J2 1.4 x

6 Pek. Kaca Jendela Polos 5 mm BV1 0.4 x


BV2 0.4 x
BV3 0.4 x
7 Pek. Pemasangan stiker sunblass Luasan kaca
kaca 5mm 7.92 x

1 Pek. Rangka Atap Baja Ringan Zincalume selasar 31 x


gedung 31 x

2 Pek. Pemasangan Penutup atap spandek pasir warna


Segitiga 9.00 x
alas atas alas bawah
Trapesium 24.00 +
selasar 31 x

3 Pek. Pemasangan Nok genteng metal pasir jumlah sisi


Nok Atas 31.00 x
Nok Bawah 4.00 x

4 Pek. Rangka Hollow untuk plafond 31 x

5 Pek. Penutup Plafond GRC Board 31 x

6 Pek. Pemasangan Listplang GRC 9 x

7 Pek. Pemasangan Tiang Kanopy 3.5 x

1 Pek. Lantai Keramik 40 x 40 Cm 31 x


pengurang kamar mandi 1 1.5 x
kamar mandi 2 1.25 x
kamar mandi 3 1.5 x
3 x
1.5 x
1 x
1 x
2 Pek. Lantai Keramik Km 25 x 25 (anti Selip) kamar mandi 1 1.5 x
kamar mandi 2 1.25 x
kamar mandi 3 1.5 x
3 x
1.5 x
1 x
1 x
Volume (v) Satuan
Koefisien
Lebar (l) Tinggi (t) Jumlah (q)
(k)

0.8 x 1.25 = 59.5


0.8 x 1.25 = 74.75
0.8 x 1.25 = 18
0.8 x 1.25 = 31
0.8 x 1.25 = 1.75
0.8 x 1.25 = 1.25

1.15 x 1.95 x 24 = 67.275


1 x 1.7 x 9 = 15.3
Jumlah total = 268.83 M3

0.8 x 1.25 x 1/3 = 19.83


0.8 x 1.25 x 1/3 = 24.92
0.8 x 1.25 x 1/3 = 6.00
0.8 x 1.25 x 1/3 = 10.33
0.8 x 1.25 x 1/3 = 0.58
0.8 x 1.25 x 1/3 = 0.42

1.15 x 1.95 x 24 x 1/3 = 22.425


1 x 1.7 x 9 x 1/3 = 5.1
Jumlah total = 89.61 M3

2 x 0.05 = 3.1
Jumlah total = 3.10 M3

0.80 x 0.10 = 14.90

1.15 x 0.10 x 24.00 = 3.45


1.00 x 0.10 x 9.00 = 0.90
2.00 x 0.10 = 6.20
Jumlah total = 25.45 M3

0.80 x 0.15 = 16.38

1.15 x 0.05 x 24.00 = 1.73


1.00 x 0.05 x 9.00 = 0.45
Jumlah total = 18.56 M3

alas atas alas bawah


0.30 + 0.70 / 2.00 x 0.70 = 65.19
Jumlah total = 65.19 M3

0.35 x 0.05 x 24.00 / 2.00 = 1.10


1.15
0.25 x 0.05 x 9.00 / 2.00 = 0.28
1 Jumlah total = 1.39 M3

jumlah besi koefisien besi kg/m


17.00 x 1.57824 x 24 = 1,802.98
14.00 x 1.57824 x 9 = 477.26
Jumlah total = 2280.24 Kg

1.15 + 0.2 x 24 = 23.04


2
1 + 0.2 x 24 = 19.2
2 Jumlah total = 42.24 M2

0.15 x 0.2 = 5.5875


Jumlah total = 5.59 M3
jumlah besi koefisien besi kg/m
2 x 0.88776 = 330.69
1243 x 0.22194 = 206.90
Jumlah total = 537.59 Kg

0.15 x 2 = 55.875
Jumlah total = 55.88 M2

0.35 x 3.5 x 24 x 2 = 14.7


Jumlah total = 14.70 M3
jumlah besi koefisien besi kg/m
10 x 2.225565 x 24 x 2 = 3,738.95
29 x 0.6165 x 24 x 2 = 815.26
Jumlah total = 4554.21 Kg
sisi tinggi
2 x 3.5 x 24 x 2 = 117.6
2 x 3.5 x 24 x 2.00 = 84
Jumlah total = 201.60 M2

0.25 x 3.5 x 9 x 2 = 3.9375


Jumlah total = 3.94 M3
jumlah besi koefisien besi kg/m
8 x 2.225565 x 9 x 2 = 1,121.68
29 x 0.39456 x 9 x 2 = 185.36
Jumlah total = 1307.05 Kg
sisi tinggi
4 x 3.5 x 9 x 2 = 63
Jumlah total = 63.00 M2

0.25 x 3.5 x 22 = 2.31


Jumlah total = 2.31 M3
jumlah besi koefisien besi kg/m
6 x 0.88776 x 22 = 410.15
24 x 0.22194 x 22 = 90.23
Jumlah total = 500.38 Kg
sisi tinggi
2 x 3.5 x 22 = 38.5
2 x 3.5 x 22 18.48
Jumlah total = 56.98 M2

0.25 x 3.5 x 22 = 2.31


Jumlah total = 2.31 M3
jumlah besi koefisien besi kg/m
2 x 0.88776 = 216.61
611 x 0.22194 = 104.42
Jumlah total = 321.03 Kg
sisi tinggi
0.4 x 0.15 = 7.32
Jumlah total = 7.32 M2
0.25 x 0.6 = 1.8
Jumlah total = 1.80 M3
jumlah besi koefisien besi kg/m
6 x 0.88776 = 63.92
61 x 0.39456 = 30.09
Jumlah total = 94.00 Kg
sisi tinggi
0.25 + 1.2 = 17.4
Jumlah total = 17.40 M2

0.25 x 0.4 = 11.8


Jumlah total = 11.80 M3
jumlah besi koefisien besi kg/m
4 x 12.42864 = 5,866.32
591 x 0.39456 = 244.84
Jumlah total = 6111.16 Kg
sisi tinggi
0.25 + 0.8 = 123.9
Jumlah total = 123.90 M2

0.2 x 0.4 = 2.48


Jumlah total = 2.48 M3
jumlah besi koefisien besi kg/m
4 x 12.42864 = 1,541.15
156 x 0.39456 = 64.63
Jumlah total = 1605.78 Kg
sisi tinggi
0.2 + 0.8 = 31
Jumlah total = 31.00 M2

0.2 x 0.4 = 10.68


Jumlah total = 10.68 M3
jumlah besi koefisien besi kg/m
4 x 12.42864 = 6,636.89
669 x 0.39456 = 277.16
Jumlah total = 6914.05 Kg
sisi tinggi
0.2 + 0.8 = 133.5
Jumlah total = 133.50 M2
9 x 0.12
= 31.59
5.25 x 0.12
Jumlah total = 31.59 M3

73 x 0.6165 = 1395.1395
249 x 0.6165 = 1381.5765
Jumlah total = 2776.72 Kg

9 x 1
= 263.25
5.25 x 1
Jumlah total = 263.25 M2

x 3.5 = 777
x 3.5 = 11.375
x 3.5 = 13.125
x 3.5 = 10.5
Jumlah total = 812.00 M2

1.4 x 5 = 17.5
0.8 x 4 = 8
0.8 x 5 = 8.4
1.8 x 2 = 3.6
1.2 x 36 = 60.48
0.7 x 3 = 4.2
0.6 x 3 = 0.72
1.2 x 3 = 1.44
1.8 x 8 = 5.76
Jumlah total = 110.10 M2

Jumlah total = 701.90 M2

sisi yg di plester
x 2.00 = 1,403.80
Jumlah total = 1,403.80 M2

sisi yg di aci
x 2.00 = 1,403.80
Jumlah total = 1,403.80 M2

x 5 x 3 = 37.5
x 4 x 2 = 20
x 5 x 1 = 10.5
x 2 x 3 = 6
x 36 x 4 = 201.6
x 3 x 1 = 6
x 3 x 1 = 1.2
x 3 x 2 = 2.4
x 8 x 3 = 9.6
Jumlah total = 294.80 M

1.4 x 5 = 17.5
0.8 x 4 = 8
0.8 x 5 = 8.4
0.7 x 3 = 4.2
Jumlah total = 38.10 M2

1.4 x 5 = 17.5
0.8 x 4 = 8
Jumlah total = 25.50 M2

1.8 x 2 = 3.6
1.2 x 36 = 60.48
0.6 x 3 = 0.72
1.2 x 3 = 1.44
1.8 x 8 = 5.76
Jumlah total = 72.00 M2

1.8 x 2 = 3.6
1.2 x 36 = 60.48
Jumlah total = 64.08 M2

0.6 x 3 = 0.72
1.2 x 3 = 1.44
1.8 x 8 = 5.76
Jumlah total = 7.92 M2

1 = 7.92
Jumlah total = 7.92 M2

2 = 62
9 = 279
Jumlah total = 341.00 M2

1/2 x 5.50 x 2.00 = 49.5


alas bawah tinggi jumlah
31.00 / 2.00 x 2.98 x 2.00 = 163.63
2 = 62
Jumlah total = 275.13 M2
jumlah sisi
1.00 = 31.00
4.00 = 16.00
Jumlah total = 47.00 M2

9 = 279
Jumlah total = 279.00 M2

9 = 279
Jumlah total = 279.00 M2

1 = 9
Jumlah total = 9.00 M2

2 = 7
Jumlah total = 7.00 M2

9 x 2 = 558
1.75 = 2.625
1.75 = 2.1875
1.75 = 2.625
1.25 = 3.75
2.25 = 3.375
1 = 1
0.5 x 10 = 5
Jumlah total = 537.44 M2

1.75 = 2.625
1.75 = 2.1875
1.75 = 2.625
1.25 = 3.75
2.25 = 3.375
1 = 1
0.5 x 10 = 5
Jumlah total = 20.56 M2
No Uraian Pekerjaaan Keterangan Panjang (p)

1 Pekerjaan Galian Tanah Pondasi Batu


Sekat Tengah Vertikal 59.5 x
Horizontal 74.75 x
Teras Vertikal 18 x
Horizontal 31 x
Kamar Mandi Vertikal 1.75 x
Horizontal 1.25 x
Pondasi Tapak
K1 1.25 x
K2 1 x

2 Pekerjaan Timbunan sisa galian pondasi


Sekat Tengah Vertikal 59.5 x
Horizontal 74.75 x
Teras Vertikal 18 x
Horizontal 31 x
Kamar Mandi Vertikal 1.75 x
Horizontal 1.25 x
Pondasi Tapak
K1 1.25 x
K2 1 x

3 Pekerjaan Timbunan tanah peninggian lantai di padatkan


Selasar Depan 31 x

4 Pekerjaan Timbunan Pasir Bawah Lantai dan pondasi


Pondasi batu 186.25 x
Pondasi Tapak
K1 1.25 x
K2 1.00 x
lantai 31.00 x

5 Pekerjaan Batu kosong dan lantai kerja


Pondasi batu 136.50 x
Pondasi Tapak
K1 1.25 x
K2 1.00 x

6 Pek. Pasangan Pondasi Batu Belah Adk.1:4


Pondasi Batu 186.25 x

1 Pekerjaan Pondasi Tapak


Pek. Beton f’c = 21,7 MPa (K250) K1 1.25 +

K2 1.00 +

pembesian jumlah besi


K1 Sengkang Ø 16 - 150 2.8 x
K2 Sengkang Ø 16 - 150 2.4 x

bekisting
K1 1.25 +

K2 1 +

2 Pekerjaan Sloof 15/20


Pek. Beton f’c = 21,7 MPa (K250) pondasi 186.25 x

jumlah besi
pembesian Tulangan Utama 2 Ø 12 186.25 x
Sengkang Ø 16 - 150 0.75 x

bekisting 186.25 x

3 Pekerjaan Kolom K1
Pek. Beton f’c = 21,7 MPa (K250) 0.25 x

pembesian Tulangan Utama 10Ø 19 3.50 x


Sengkang Ø 10 - 125 0.95 x
bekisting vertkal 0.35 x
horizontal 0.25 x

4 Pekerjaan Kolom K2
Pek. Beton f’c = 21,7 MPa (K250) 0.25 x

jumlah besi
pembesian Tulangan Utama 8Ø 19 3.50 x
Sengkang Ø 8 - 125 0.9 x

bekisting vertkal 0.25 x

5 Pekerjaan Kolom K3
Pek. Beton f’c = 21,7 MPa (K250) 0.12 x

jumlah besi
pembesian Tulangan Utama 6Ø 12 3.50 x
Sengkang Ø 6 - 150 0.77 x

bekisting vertkal 0.25 x


horizontal 0.12 x

6 Pekerjaan Ring Balok 15/20


Pek. Beton f’c = 21,7 MPa (K250) 0.12 x

jumlah besi
pembesian Tulangan Utama 2Ø 12 122.00 x
Sengkang Ø 6 - 200 0.77 x

bekisting 122.00 x

7 Pekerjaan Balok Lantai


B1
Pek. Beton f’c = 21,7 MPa (K250) 12 x

jumlah besi
pembesian Tulangan Utama 6Ø 12 12.00 x
Sengkang Ø 8 - 200 1.25 x

bekisting 12.00 x

B2
Pek. Beton f’c = 21,7 MPa (K250) 118 x

jumlah besi
pembesian Tulangan Utama 4Ø 16 118.00 x
Sengkang Ø 8 - 200 1.05 x

bekisting 118.00 x

B3
Pek. Beton f’c = 21,7 MPa (K250) 31 x

jumlah besi
pembesian Tulangan Utama 4Ø 16 31.00 x
Sengkang Ø 8 - 200 1.05 x

bekisting 31.00 x

B4
Pek. Beton f’c = 21,7 MPa (K250) 133.5 x

jumlah besi
pembesian Tulangan Utama 4Ø 16 133.50 x
Sengkang Ø 8 - 200 1.05 x

bekisting 133.50 x
7 Pekerjaan Dak Tebal 12 cm
Pek. Beton f’c = 21,7 MPa (K250) 31 x
3 x

pembesian vertikal Ø 10 - 125 31 x


horizontal Ø 10 - 125 9 x

bekisting 31 x
3 x

1 Pek. Dinding Batu Bata adk. 1:4 Pas 1/2 Bata


Sekat Dinding 20 x
Kamar Mandi 1 3.25 x

Lubang Dinding Kusen


P1 2.5 x
P1s 2.1 x
J3 1 x
J2 1.4 x
PKM 1 x
BV1 0.4 x
BV2 0.4 x
BV3 0.4 x

Volume Pas.Dinding
31.20
2 Pek. Plesteran Dinding adk. 1:4

Volume Pas.Dinding
31.20
3 Pek. Acian Dinding
1 Pek. Kusen Pintu dan Jendela Alumunium P2 2.5
P1 2.5
P1s 2.1
J3 1
J2 1.4
PKM 2
BV1 0.4
BV2 0.4
BV3 0.4

2 Pek. Daun Pintu Alumunium+accesoris P2 2.5 x


P1 2.5 x
P1s 2.1 x
PKM 2 x

P2 2.5 x
3 Pek. Kaca Pintu Ryban 8 mm P1 2.5 x

J3 1 x
4 Pek. Daun Jendela Alumunium+accesoris J2 1.4 x
BV1 0.4 x
BV2 0.4 x
BV3 0.4 x

J3 1 x
5 Pek. Kaca Jendela Ryban 5 mm J2 1.4 x

BV1 0.4 x
6 Pek. Kaca Jendela Polos 5 mm BV2 0.4 x
BV3 0.4 x
Luasan kaca
7 Pek. Pemasangan stiker sunblass 7.92 x
kaca 5mm

31 x
1 Pek. Rangka Atap Baja Ringan Zincalume

2 Pek. Pemasangan Penutup atap spandek pasir warna selasar 31 x

jumlah sisi
Nok Atas 31.00 x
Nok Bawah 4.00 x

3 Pek. Pemasangan Nok genteng metal pasir


31 x

31 x
4 Pek. Rangka Hollow untuk plafond

5 Pek. Penutup Plafond GRC Board 124.00 x

3.5 x
6 Pek. Pemasangan Listplang GRC

15 x
7 Pek. Pemasangan Tiang Kanopy kamar mandi 1 1.5 x

1 Pek. Lantai Keramik 40 x 40 Cm kamar mandi 1 1.5 x


pengurang kamar mandi 2 1.25 x
kamar mandi 3 1.5 x
2 Pek. Lantai Keramik Km 25 x 25 (anti Selip) 3 x
1.5 x
1 x
1 x
kamar mandi 1 5.8
kamar mandi 2 5.3
3 Pek. Keramik dinding kamar mandi kamar mandi 3 5.8

1
1 Pek. Pemasangan Lampu RM 2x18 Watt
1
2 Pek. Lampu Down Light
1
3 Pek. Saklar Single
1
4 Pek. Saklar Double

5 Pek. Stop Kontak Volume Dinding


62.40
P2 1.4
1 Pek. Pengecatan Dinding P1 0.8
P1s 0.8
Kusen J3 1.8
J2 1.2
BV1 0.6
BV2 1.2
BV3 1.8

Volume Plafond
62.00

2 Pek. Pengecatan Plafond


Volume Listplang
124.00

3 Pek. Pengecatan Listplang


1 Pek.Pemasangan Closed Duduk Lengkap
R. Mikrobiologi 4
Ruang instruktur pebimbing 4
2 Pek. Pemasangan Pipa air kotor PVC Ø 2" R.Lab Kimia 4
R. Bahan 4
R. Lemari Asam 4
R. Lab Vektor 4
R. Lab Fisika 4
R. Lab Parasit 4

3 Pek. Pemasangan Pipa ke septictank PVC Ø 4"


R. Mikrobiologi 4
Ruang instruktur pebimbing 4
4 Pek. Pemasangan Pipa air bersih PVC Ø 1" R.Lab Kimia 4
R. Bahan 4
R. Lemari Asam 4
R. Lab Vektor 4
R. Lab Fisika 4
R. Lab Parasit 4

5 Pek. Pemasangan Kran air Ø 3/4"

6 Pek.Pemasangan Floor Drain


Volume (v) Satuan
Koefisien
Lebar (l) Tinggi (t) Jumlah (q)
(k)

0.8 x 1.25 = 59.5


0.8 x 1.25 = 74.75
0.8 x 1.25 = 18
0.8 x 1.25 = 31
0.8 x 1.25 = 1.75
0.8 x 1.25 = 1.25

1.15 x 1.95 x 24 = 67.275


1 x 1.7 x 9 = 15.3
Jumlah total = 268.83 M3

0.8 x 1.25 x 1/3 = 19.83


0.8 x 1.25 x 1/3 = 24.92
0.8 x 1.25 x 1/3 = 6.00
0.8 x 1.25 x 1/3 = 10.33
0.8 x 1.25 x 1/3 = 0.58
0.8 x 1.25 x 1/3 = 0.42

1.15 x 1.95 x 24 x 1/3 = 22.425


1 x 1.7 x 9 x 1/3 = 5.1
Jumlah total = 89.61 M3

2 x 0.05 = 3.1
Jumlah total = 3.10 M3

0.80 x 0.10 = 14.90

1.15 x 0.10 x 24.00 = 3.45


1.00 x 0.10 x 9.00 = 0.90
2.00 x 0.10 = 6.20
Jumlah total = 25.45 M3

0.80 x 0.15 = 16.38

1.15 x 0.05 x 24.00 = 1.73


1.00 x 0.05 x 9.00 = 0.45
Jumlah total = 18.56 M3

alas atas alas bawah


0.30 + 0.70 / 2.00 x 0.70 = 65.19
Jumlah total = 65.19 M3

0.35 x 0.05 x 24.00 / 2.00 = 1.10


1.15
0.25 x 0.05 x 9.00 / 2.00 = 0.28
1 Jumlah total = 1.39 M3

jumlah besi koefisien besi kg/m


17.00 x 1.57824 x 24 = 1,802.98
14.00 x 1.57824 x 9 = 477.26
Jumlah total = 2280.24 Kg

1.15 + 0.2 x 24 = 23.04


2
1 + 0.2 x 24 = 19.2
2 Jumlah total = 42.24 M2

0.15 x 0.2 = 5.5875


Jumlah total = 5.59 M3
jumlah besi koefisien besi kg/m
2 x 0.88776 = 330.69
1243 x 0.22194 = 206.90
Jumlah total = 537.59 Kg

0.15 x 2 = 55.875
Jumlah total = 55.88 M2

0.35 x 3.5 x 24 x 2 = 14.7


Jumlah total = 14.70 M3
jumlah besi koefisien besi kg/m
10 x 2.225565 x 24 x 2 = 3,738.95
29 x 0.6165 x 24 x 2 = 815.26
Jumlah total = 4554.21 Kg
sisi tinggi
2 x 3.5 x 24 x 2 = 117.6
2 x 3.5 x 24 x 2.00 = 84
Jumlah total = 201.60 M2

0.25 x 3.5 x 9 x 2 = 3.9375


Jumlah total = 3.94 M3
jumlah besi koefisien besi kg/m
8 x 2.225565 x 9 x 2 = 1,121.68
29 x 0.39456 x 9 x 2 = 185.36
Jumlah total = 1307.05 Kg
sisi tinggi
4 x 3.5 x 9 x 2 = 63
Jumlah total = 63.00 M2

0.25 x 3.5 x 22 = 2.31


Jumlah total = 2.31 M3
jumlah besi koefisien besi kg/m
6 x 0.88776 x 22 = 410.15
24 x 0.22194 x 22 = 90.23
Jumlah total = 500.38 Kg
sisi tinggi
2 x 3.5 x 22 = 38.5
2 x 3.5 x 22 18.48
Jumlah total = 56.98 M2

0.25 x 3.5 x 22 = 2.31


Jumlah total = 2.31 M3
jumlah besi koefisien besi kg/m
2 x 0.88776 = 216.61
611 x 0.22194 = 104.42
Jumlah total = 321.03 Kg
sisi tinggi
0.4 x 0.15 = 7.32
Jumlah total = 7.32 M2
0.25 x 0.6 = 1.8
Jumlah total = 1.80 M3
jumlah besi koefisien besi kg/m
6 x 0.88776 = 63.92
61 x 0.39456 = 30.09
Jumlah total = 94.00 Kg
sisi tinggi
0.25 + 1.2 = 17.4
Jumlah total = 17.40 M2

0.25 x 0.4 = 11.8


Jumlah total = 11.80 M3
jumlah besi koefisien besi kg/m
4 x 12.42864 = 5,866.32
591 x 0.39456 = 244.84
Jumlah total = 6111.16 Kg
sisi tinggi
0.25 + 0.8 = 123.9
Jumlah total = 123.90 M2

0.2 x 0.4 = 2.48


Jumlah total = 2.48 M3
jumlah besi koefisien besi kg/m
4 x 12.42864 = 1,541.15
156 x 0.39456 = 64.63
Jumlah total = 1605.78 Kg
sisi tinggi
0.2 + 0.8 = 31
Jumlah total = 31.00 M2

0.2 x 0.4 = 10.68


Jumlah total = 10.68 M3
jumlah besi koefisien besi kg/m
4 x 12.42864 = 6,636.89
669 x 0.39456 = 277.16
Jumlah total = 6914.05 Kg
sisi tinggi
0.2 + 0.8 = 133.5
Jumlah total = 133.50 M2
9 x 0.12
= 31.59
5.25 x 0.12
Jumlah total = 31.59 M3

73 x 0.6165 = 1395.1395
249 x 0.6165 = 1381.5765
Jumlah total = 2776.72 Kg

9 x 1
= 263.25
5.25 x 1
Jumlah total = 263.25 M2

x 3.5 = 70
x 3.5 = 11.375

Jumlah total = 81.38 M2

0.8 x 4 = 8
0.8 x 5 = 8.4
1.8 x 2 = 3.6
1.2 x 12 = 20.16
0.7 x 3 = 2.1
0.6 x 3 = 0.72
1.2 x 3 = 1.44
1.8 x 8 = 5.76
Jumlah total = 50.18
M2
Jumlah total = 31.20
M2
sisi yg di plester
x 2.00 = 62.40
Jumlah total = 62.40
M2
sisi yg di aci
x 2.00 = 62.40
Jumlah total = 62.40
M2

x 5 x 3 = 37.5
x 4 x 2 = 20
x 5 x 1 = 10.5
x 2 x 3 = 6
x 36 x 4 = 201.6
x 3 x 1 = 6
x 3 x 1 = 1.2
x 3 x 2 = 2.4
x 8 x 3 = 9.6
Jumlah total = 294.80
M

1.4 x 5 = 17.5
0.8 x 4 = 8
0.8 x 5 = 8.4
0.7 x 3 = 4.2
Jumlah total = 38.10
M2
1.4 x 5 = 17.5
0.8 x 4 = 8
Jumlah total = 25.50
M2
1.8 x 2 = 3.6
1.2 x 36 = 60.48
0.6 x 3 = 0.72
1.2 x 3 = 1.44
1.8 x 8 = 5.76
Jumlah total = 72.00
M2
1.8 x 2 = 3.6
1.2 x 36 = 60.48
Jumlah total = 64.08
M2
0.6 x 3 = 0.72
1.2 x 3 = 1.44
1.8 x 8 = 5.76
Jumlah total = 7.92
M2

1 = 7.92
Jumlah total = 7.92
M2
2 = 62

Jumlah total = 62.00


M2
2 = 62
Jumlah total = 62.00
jumlah sisi
1.00 = 31.00
4.00 = 16.00
Jumlah total = 47.00 M2

9 = 279
Jumlah total = 279.00
M2
2 = 62
Jumlah total = 62.00
M2

1 = 124
Jumlah total = 124.00 M2

2 = 7
Jumlah total = 7.00
M2
7 = 105
1.75 = 2.625
Jumlah total = 102.38 M2

1.75 = 2.625
1.75 = 2.1875
1.75 = 2.625
1.25 = 3.75
2.25 = 3.375
1 = 1
0.5 x 10 = 5
Jumlah total = 20.56
M2

x 1.5 = 8.7
x 1.5 = 7.95
x 1.5 = 8.7
Jumlah total = 25.35

x 32 = 32

x 28 = 28 M2

x 10 = 10

x 7 = 7

x 30 = 30 M2
Jumlah total = 107.00

x 1 = 62.40
x 2.5 x 5 = 17.5
x 2.5 x 4 = 8
x 2.1 x 5 = 8.4
x 1 x 2 = 3.6
x 1.4 x 36 = 60.48
x 0.4 x 3 = 0.72
x 0.4 x 3 = 1.44 Bh
x 0.4 x 8 = 5.76
Jumlah total = 168.30

x 1 = 62.00
Jumlah total = 62.00

x 1 = 124.00
Jumlah total = 124.00

3 = 3 M2
Jumlah total = 3.00
x 2 = 8 M2
x 1 = 4
x 2 = 8
x 1 = 4
x 1 = 4 M2
x 2 = 8
x 2 = 8
x 2 = 8 Bh
Jumlah total = 52.00

x 3 = 12
Jumlah total = 12.00

x 2 = 8
x 1 = 4
x 2 = 8
x 1 = 4
x 1 = 4 M
x 2 = 8
x 2 = 8
x 2 = 8 M
Jumlah total = 52.00

23 = 23
Jumlah total = 23.00

3 = 3
Jumlah total = 3.00

Bh

Bh
DAFTAR KUANTITAS DAN HARGA BAHAN
RENCANA ANGGARAN BIAYA

Kegiatan : Pembangunan Gedung Baru


Pekerjaan : Pembangunan LAB POLTEKES
Lokasi : BANDAR LAMPUNG
TA : 2019

NO. ITEM Uraian Pekerjaan Analisa Satuan

a b c d

A PEKERJAAN PERSIAPAN
1 Pekerjaan Pelaporan dan Dokumentasi LS LS
2 Papan Nama Proyek LS Bh
3 Direksi Keet & Gudang Alat-Bahan Kerja LS LS
4 Listrik dan Air kerja LS LS
5 Program Kesehatan dan Keselamatan Kerja (K3) Konstruksi LS LS

B PEKERJAAN PEMBANGUNAN KONTRUKSI


III PEKERJAAN DINDING
1 Pek. Pasangan 1/2 Bata Adk. 1:4 A.4.4.1.9 M2
2 Pek. Plesteran Dinding Adk. 1:4 A.4.4.2.4 M2
3 Pek. Acian A.4.4.2.27 M2

IV PEKERJAAN KUSEN, PINTU, JENDELA, FENTILASI & ROSTER


1 Pek. Kusen Pintu dan Jendela Alumunium A.4.2.1.11.a M'
2 Pek. Daun Pintu Alumunium+accesoris A.4.2.1.13 M2
3 Pek. Kaca Pintu Ryban 8 mm A.4.6.2.17.a M2
4 Pek. Daun Jendela Alumunium+accesoris A.4.2.1.13.a M2
5 Pek. Kaca Jendela Ryban 5 mm A.4.6.2.17 M2
6 Pek. Kaca Jendela Polos 5 mm Harga satuan M2
7 Pek. Pemasangan stiker sunblass M2

V PEKERJAAN PENUTUP ATAP DAN KANOPI


1 Pek. Rangka Atap Baja Ringan Zincalume untuk Selasar Depan A.4.2.1.22 M2
2 Pek. Pemasangan Penutup atap spandek pasir warna A.4.5.2.32 M2
3 Pek. Pemasangan Nok genteng metal pasir A.4.5.2.36 M2
4 Pek. Pemasangan Tiang Kanopy M2
VI PEKERJAAN LANGIT-LANGIT
1 Pek. Plafond GRC A.4.5.1.5.b M2
2 Pek. Rangka Plafond Besi Hollow A.4.2.1.21 M2
Pek. Pemasangan Listplang GRC M'

VII PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pek. Lantai Keramik 40 x 40 Cm A.4.4.3.35.b M2
2 Pek. Lantai Keramik Km 25 x 25 (anti Selip) A.4.4.3.36 M2
3 Pek. Keramik dinding kamar mandi A.4.4.3.54.a M2

IX PEKERJAAN ELEKTRIKAL
1 Pek. Pemasangan Lampu RM 2x18 Watt A.6.1.1.1 Titik
2 Pek. Lampu Down Light Harga satuan bh
3 Pek. Saklar Single A.6.1.1.5 bh
4 Pek. Saklar Double A.6.1.1.4 bh
5 Pek. Stop Kontak A.6.1.1.3 bh

X PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding A.4.7.1.10 M2
2 Pek. Pengecatan Plafond A.4.7.1.10 M2
3 Pek. Pengecatan Listplang A.4.7.1.10 M2

XI PEKERJAAN SANITASI
1 Pek.Pemasangan Closed Duduk Lengkap A.5.1.1.1 Unit
2 Pek. Pemasangan Pipa air kotor PVC Ø 2" A.5.1.1.2 Bh
3 Pek. Pemasangan Pipa ke septictank PVC Ø 4" A.5.1.1.29 M
4 Pek. Pemasangan Pipa air bersih PVC Ø 1" A.5.1.1.31 M
5 Pek. Pemasangan Kran air Ø 3/4" A.5.1.1.25 M
6 Pek.Pemasangan Floor Drain A.5.1.1.19 Bh
7 Pek.Pembuatan Septictank Ls Unit

Jumlah Total Pekerjaan A+B (I+II+III+……..)


PPN 10%
Jumlah Total Pekerjaan A+B (I+II+III+……..)+PPN 10%
HARGA BAHAN
AN BIAYA

Harga Satuan Harga Satuan (Rp) Total Harga + PPN


Volume
(Rp) + PPN 10% 10% (Rp)
e f g = f + ( f x 10% ) h=ex g
1.1

1.00 Rp 2,000,000.00 Rp 2,200,000.00 Rp 2,200,000.00


1.00 Rp 350,000.00 Rp 385,000.00 Rp 385,000.00
1.00 Rp 2,000,000.00 Rp 2,200,000.00 Rp 2,200,000.00
1.00 Rp 1,000,000.00 Rp 1,100,000.00 Rp 1,100,000.00
1.00 Rp 1,500,000.00 Rp 1,650,000.00 Rp 1,650,000.00

Jumlah Total A Rp 7,535,000.00

31.20 Rp 97,333.50 Rp 3,036,805.20


62.40 Rp 64,641.06 Rp 4,033,602.14
62.40 Rp 39,413.00 Rp 2,459,371.20

Jumlah Total II Rp 9,529,778.54

294.80 Rp 617,270.50 Rp 197,789.35 Rp 58,308,300.38


14.81 Rp 234,850.00 Rp 258,335.00 Rp 3,825,941.35
25.50 Rp 144,000.00 Rp 158,400.00 Rp 4,039,200.00
72.00 Rp 520,470.50 Rp 572,517.55 Rp 41,221,263.60
64.08 Rp 216,700.00 Rp 238,370.00 Rp 15,274,749.60
7.92 Rp 216,700.00 Rp 238,370.00 Rp 1,887,890.40
7.92 Rp 100,000.00 Rp 110,000.00 Rp 871,200.00
Jumlah Total IV Rp 125,428,545.33

62.00 Rp 242,707.28 Rp 266,978.01 Rp 16,552,636.50


62.00 Rp 117,621.00 Rp 129,383.10 Rp 8,021,752.20
47.00 Rp 75,157.50 Rp 82,673.25 Rp 3,885,642.75
7.00 Rp 720,615.50 Rp 792,677.05 Rp 5,548,739.35
Jumlah Total V Rp 34,008,770.80
62.00 Rp 102,520.00 Rp 112,772.00 Rp 6,991,864.00
62.00 Rp 135,245.00 Rp 148,769.50 Rp 9,223,709.00
124.00 Rp 52,362.50 Rp 57,598.75 Rp 7,142,245.00
Jumlah Total VI Rp 23,357,818.00

102.38 Rp 162,334.98 Rp 178,568.48 Rp 18,281,840.78


20.56 Rp 214,655.10 Rp 236,120.61 Rp 4,854,639.74
25.35 Rp 265,129.70 Rp 291,642.67 Rp 7,393,141.68

Jumlah Total VII Rp 30,529,622.20

32.00 Rp 471,600.00 Rp 518,760.00 Rp 16,600,320.00


28.00 Rp 80,200.00 Rp 88,220.00 Rp 2,470,160.00
10.00 Rp 118,800.00 Rp 130,680.00 Rp 1,306,800.00
7.00 Rp 129,800.00 Rp 142,780.00 Rp 999,460.00
30.00 Rp 96,800.00 Rp 106,480.00 Rp 3,194,400.00

Jumlah Total VIII Rp 24,571,140.00

168.30 Rp 44,870.10 Rp 49,357.11 Rp 8,306,801.61


62.00 Rp 17,430.00 Rp 19,173.00 Rp 1,188,726.00
124.00 Rp 79,175.00 Rp 87,092.50 Rp 10,799,470.00

Jumlah Total IX Rp 20,294,997.61

3.00 Rp 2,768,920.00 Rp 3,045,812.00 Rp 9,137,436.00


52.00 Rp 180,801.50 Rp 198,881.65 Rp 10,341,845.80
12.00 Rp 527,810.00 Rp 580,591.00 Rp 6,967,092.00
52.00 Rp 78,060.00 Rp 85,866.00 Rp 4,465,032.00
23.00 Rp 136,895.00 Rp 150,584.50 Rp 3,463,443.50
3.00 Rp 126,197.50 Rp 138,817.25 Rp 416,451.75
1.00 Rp 5,000,000.00 Rp 5,500,000.00 Rp 5,500,000.00

Jumlah Total XI Rp 40,291,301.05


Rp 315,546,973.53
Rp 31,554,697.35
Rp 347,101,670.88
ANALISA HARGA SATUAN PEKERJAAN

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 90,000.00 9,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 20,825.00
B BAHAN
Kayu kasau kelas III m3 0.1200 2,000,000.00 240,000.00
Paku 5 – 10 cm Kg 0.0200 15,000.00 300.00
Kayu papan kelas III m3 0.0070 2,100,000.00 14,700.00
JUMLAH HARGA BAHAN 255,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 275,825.00
E Overhead & Profit 10% x D 27,582.50
F Harga Satuan Pekerjaan (D+E) 303,407.50

A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m


Harga Satuan Jumlah Harga
No Uraian Kode Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.7500 OH 90,000.00 67,500.00
Mandor L.04 0.0250 OH 125,000.00 3,125.00
JUMLAH TENAGA KERJA 70,625.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 70,625.00
E Overhead & Profit 10% x D 7,062.50
F Harga Satuan Pekerjaan (D+E) 77,687.50

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Harga Satuan Jumlah Harga
No Uraian Kode Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.5000 OH 90,000.00 45,000.00
Mandor L.04 0.0500 OH 125,000.00 6,250.00
JUMLAH TENAGA KERJA 51,250.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 51,250.00
E Overhead & Profit 10% x D 5,125.00
F Harga Satuan Pekerjaan (D+E) 56,375.00

A.2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)


Harga Satuan Jumlah Harga
No Uraian Kode Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 90,000.00 45,000.00

Page 43 of 78
Mandor L.04 OH 0.0500 125,000.00 6,250.00
JUMLAH TENAGA KERJA 51,250.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 51,250.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 51,250.00

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 90,000.00 27,000.00
Mandor L.04 OH 0.0100 125,000.00 1,250.00
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Pasir urug 1.2000 150,000.00 180,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 208,250.00
E Overhead & Profit 10% x D 20,825.00
F Harga Satuan Pekerjaan (D+E) 229,075.00

A.2.3.1.14.a Pengurugan 1 m3 Tanah timbunan biasa


Harga Satuan Jumlah Harga
No Uraian Kode Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 90,000.00 22,500.00
Mandor L.04 OH 0.0250 125,000.00 3,125.00
JUMLAH TENAGA KERJA 25,625.00
B BAHAN
Tanah Timbunan Biasa m3 1.2000 37,500.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 70,625.00
E Overhead & Profit 10% x D 7,062.50
F Harga Satuan Pekerjaan (D+E) 77,687.50

A.2.3.1.16. Pengurugan 1 m3 Tanah timbunan pilihan


Harga Satuan Jumlah Harga
No Uraian Kode Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 90,000.00 22,500.00
Mandor L.04 OH 0.0250 125,000.00 3,125.00
JUMLAH TENAGA KERJA 25,625.00
B BAHAN
Tanah Timbunan pilihan m3 1.2000 50,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 85,625.00
E Overhead & Profit 0% x D -

Page 44 of 78
F Harga Satuan Pekerjaan (D+E) 85,625.00

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 90,000.00 135,000.00
Tukang Batu L.02 OH 0.7500 120,000.00 90,000.00
Kepala Tukang L.03 OH 0.0750 120,000.00 9,000.00
Mandor L.04 OH 0.0750 125,000.00 9,375.00
JUMLAH TENAGA KERJA 243,375.00
B BAHAN
Batu Belah Hitam Utk Pondasi m3 1.2000 200,000.00 240,000.00
Semen portland Kg 163.0000 1,040.00 169,520.00
Pasir Pasang m3 0.5200 150,000.00 78,000.00
JUMLAH HARGA BAHAN 487,520.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 730,895.00
E Overhead & Profit 10% x D 73,089.50
F Harga Satuan Pekerjaan (D+E) 803,984.50

A.3.2.1.9. Pemasangan 1m³ batu kosong (anstamping)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7800 90,000.00 70,200.00
Tukang batu L.02 OH 0.3900 120,000.00 46,800.00
Kepala tukang L.03 OH 0.0390 120,000.00 4,680.00
Mandor L.04 OH 0.0390 125,000.00 4,875.00
JUMLAH TENAGA KERJA 126,555.00
B BAHAN
Batu Belah Hitam Utk Pondasi m3 1.200 200,000.00 240,000.00
Pasir urug Kg 0.432 1,050.00 453.60

JUMLAH HARGA BAHAN 240,453.60


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 367,008.60
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 367,008.60

A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100),
slump (3-6) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 90,000.00 108,000.00
Tukang Batu L.02 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0600 125,000.00 7,500.00
JUMLAH TENAGA KERJA 141,900.00
B BAHAN
Semen portland kg 230.0000 1,040.00 239,200.00
Pasir beton (kg) m3 0.6379 250,000.00 159,464.29
Batu Split 1/2 cm m3 0.5706 220,000.00 125,522.22
Air Liter 200.0000 100.00 20,000.00
Batu Belah Hitam Utk Pondasi m3 1.200 200,000.00 240,000.00
Pasir urug Kg 0.432 1,050.00 453.60

Page 45 of 78
JUMLAH HARGA BAHAN 784,640.11
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 926,540.11
E Overhead & Profit 10% x D 92,654.01
F Harga Satuan Pekerjaan (D+E) 1,019,194.12

A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 90,000.00 148,500.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 125,000.00 10,375.00
JUMLAH TENAGA KERJA 195,235.00
B BAHAN
Semen PC (50 Kg) Kg 371.0000 1,040.00 385,840.00
Pasir beton m3 0.4986 250,000.00 124,642.86
Batu Split 1/2 cm m3 0.5817 220,000.00 127,966.67
Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 659,949.52
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 855,184.52
E Overhead & Profit 10% x D 85,518.45
F Harga Satuan Pekerjaan (D+E) 940,702.98

Page 46 of 78
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 90,000.00 148,500.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 125,000.00 10,375.00
JUMLAH TENAGA KERJA 195,235.00
B BAHAN
Semen PC (50 Kg) Kg 384.0000 1,040.00 399,360.00
Pasir beton m3 0.4943 250,000.00 123,571.43
Batu Split 1/2 cm m3 0.5772 220,000.00 126,988.89
Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 671,420.32
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 866,655.32
E Overhead & Profit 10% x D 86,665.53
F Harga Satuan Pekerjaan (D+E) 953,320.85

A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 90,000.00 148,500.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 125,000.00 10,375.00
JUMLAH TENAGA KERJA 195,235.00
B BAHAN
Semen PC (50 Kg) sak 8.2600 1,040.00 8,590.40
Pasir beton m3 0.5837 250,000.00 145,928.57
Batu Split 1/2 cm m3 0.7563 220,000.00 166,385.19
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 342,404.16
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 537,639.16

E. Harga Satuan Pekerjaan (D+E) 537,639.16

A.4.1.1.35. Membuat 1m' kolom praktis beton bertulang (11x11) cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1800 90,000.00 16,200.00
Tukang batu L.02 OH 0.0200 120,000.00 2,400.00
Tukang kayu L.02 OH 0.0200 100,000.00 2,000.00
Tukang besi L.02 OH 0.0200 120,000.00 2,400.00
Kepala tukang L.03 OH 0.0060 120,000.00 720.00
Mandor L.04 OH 0.0090 125,000.00 1,125.00
JUMLAH TENAGA KERJA 24,845.00
B BAHAN
Kayu papan kelas III m² 0.0020 2,100,000.00 4,200.00
Paku 5 – 10 cm kg 0.0100 15,000.00 150.00
Besi Beton (Polos/Ulir) kg 3.0000 11,000.00 33,000.00

Page 47 of 78
Kawat beton kg 0.45 22,000.00 9,900.00
Semen portland kg 4.00 1,040.00 4,160.00
Pasir beton m³ 0.0060 250,000.00 1,500.00
Batu Split 1/2 cm m³ 0.0090 220,000.00 1,980.00
JUMLAH HARGA BAHAN 54,890.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 79,735.00

E. Harga Satuan Pekerjaan (D+E) 79,735.00

A.4.1.1.36. Membuat 1m' ring balok beton bertulang (10x15) cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2970 90,000.00 26,730.00
Tukang batu L.02 OH 0.0330 120,000.00 3,960.00
Tukang kayu L.02 OH 0.0330 100,000.00 3,300.00
Tukang besi L.02 OH 0.0330 120,000.00 3,960.00
Kepala tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 41,025.00
B BAHAN
Kayu papan kelas III m² 0.0030 2,100,000.00 6,300.00
Paku 5 – 10 cm kg 0.0200 15,000.00 300.00
Besi Beton (Polos/Ulir) kg 3.6000 11,000.00 39,600.00
Kawat beton kg 0.0500 22,000.00 1,100.00
Semen portland kg 5.5000 1,040.00 5,720.00
Pasir beton m³ 0.0090 250,000.00 2,250.00
Batu Split 1/2 cm m³ 0.0150 220,000.00 3,300.00
JUMLAH HARGA BAHAN 58,570.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 99,595.00

E. Harga Satuan Pekerjaan (D+E) 99,595.00

A.4.2.1.1. Pemasangan 1 kg besi profil


Harga Satuan Jumlah Harga
Kode Satuan
No Uraian Koefisien (Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0600 90,000.00 5,400.00
Tukang Las Konstruksi L.O3 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.O3 OH 0.0060 120,000.00 720.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 12,495.00
B BAHAN
Besi Profil Kg 1.1500 21,000.00 24,150.00
JUMLAH HARGA BAHAN 24,150.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 36,645.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 36,645.00

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir


Harga Satuan Jumlah Harga
No Uraian Kode Koefisien Satuan
(Rp) (Rp)

Page 48 of 78
A TENAGA
Pekerja L.01 0.0700 OH 90,000.00 6,300.00
Tukang Besi L.02 0.0700 OH 120,000.00 8,400.00
Kepala Tukang L.03 0.0070 OH 120,000.00 840.00
Mandor L.04 0.0040 OH 125,000.00 500.00
JUMLAH TENAGA KERJA 16,040.00
B BAHAN
Besi beton (polos/ulir) 10.5000 Kg 11,000.00 115,500.00
Kawat beton 0.1500 Kg 22,000.00 3,300.00
JUMLAH HARGA BAHAN 118,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 134,840.00
E Overhead & Profit 10% x D 13,484.00
F Harga Satuan Pekerjaan (D+E) 148,324.00
G Harga Satuan Pekerjaan per 1 Kg 14,832.40

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 90,000.00 46,800.00
Tukang kayu L.02 OH 0.2600 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.0260 120,000.00 3,120.00
Mandor L.04 OH 0.0260 125,000.00 3,250.00
JUMLAH TENAGA KERJA 79,170.00
B BAHAN
Kayu papan kelas IV m3 0.0400 1,800,000.00 72,000.00
Paku 5 – 10 cm Kg 0.3000 15,000.00 4,500.00
Minyak bekisting Liter 0.1000 7,500.00 750.00
JUMLAH HARGA BAHAN 77,250.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 156,420.00

E. Harga Satuan Pekerjaan (D+E) 156,420.00

A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 90,000.00 46,800.00
Tukang kayu L.02 OH 0.2600 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.0260 120,000.00 3,120.00
Mandor L.04 OH 0.0260 125,000.00 3,250.00
JUMLAH TENAGA KERJA 79,170.00
B BAHAN
Kayu papan kelas III m3 0.0450 2,100,000.00 94,500.00
Paku 5 – 10 cm Kg 0.3000 15,000.00 4,500.00
Minyak bekisting Liter 0.1000 7,500.00 750.00
JUMLAH HARGA BAHAN 99,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 178,920.00
E. Overhad & Profit 10% x D 17,892.00
F. Harga Satuan Pekerjaan (D+E) 196,812.00

A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom

Page 49 of 78
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 90,000.00 59,400.00
Tukang kayu L.02 OH 0.3300 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.0330 125,000.00 4,125.00
JUMLAH TENAGA KERJA 100,485.00
B BAHAN
Kayu balok kelas III m3 0.0400 2,000,000.00 80,000.00
Paku 5 – 10 cm Kg 0.4000 15,000.00 6,000.00
Minyak bekisting Liter 0.2000 7,500.00 1,500.00
Kayu Balok kelas II m3 0.0150 3,000,000.00 45,000.00
Plywood 9 mm Lbr 0.3500 130,500.00 45,675.00
Dolken kayu gelam φ(8-10) cm Batang 2.0000 25,000.00 50,000.00

JUMLAH HARGA BAHAN 228,175.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 328,660.00
E. Overhad & Profit 10% x D 32,866.00
F. Harga Satuan Pekerjaan (D+E) 361,526.00

A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 90,000.00 59,400.00
Tukang kayu L.02 OH 0.3300 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.0330 125,000.00 4,125.00
JUMLAH TENAGA KERJA 100,485.00
B BAHAN
Kayu papan kelas III m3 0.0400 2,100,000.00 84,000.00
Paku 5 – 10 cm Kg 0.4000 15,000.00 6,000.00
Minyak bekisting Liter 0.2000 7,500.00 1,500.00
Kayu Balok kelas II m3 0.0180 3,000,000.00 54,000.00
Plywood 9 mm Lbr 0.3500 130,500.00 45,675.00
Dolken kayu gelam φ(8-10) cm Batang 2.0000 25,000.00 50,000.00

JUMLAH HARGA BAHAN 241,175.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 341,660.00
E. Overhad & Profit 10% x D 34,166.00
F. Harga Satuan Pekerjaan (D+E) 375,826.00

A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 90,000.00 59,400.00
Tukang kayu L.02 OH 0.3300 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.0330 125,000.00 4,125.00
JUMLAH TENAGA KERJA 100,485.00
B BAHAN
Kayu papan kelas III m3 0.0400 2,100,000.00 84,000.00
Paku 5 – 10 cm Kg 0.4000 15,000.00 6,000.00

Page 50 of 78
Minyak bekisting Liter 0.2000 7,500.00 1,500.00
Kayu Balok kelas II m3 0.0150 3,000,000.00 45,000.00
Plywood 9 mm Lbr 0.3500 130,500.00 45,675.00
Dolken kayu gelam φ(8-10) cm Batang 6.0000 25,000.00 150,000.00

JUMLAH HARGA BAHAN 332,175.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 432,660.00
E. Overhad & Profit 10% x D 43,266.00
F. Harga Satuan Pekerjaan (D+E) 475,926.00

A.4.1.1.25 Pemasangan 1 m2 bekisting untuk dinding


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 90,000.00 59,400.00
Tukang kayu L.02 OH 0.3300 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.3300 125,000.00 41,250.00
JUMLAH TENAGA KERJA 137,610.00
B BAHAN
Kayu papan kelas III m3 0.0300 2,100,000.00 63,000.00
Paku 5 – 10 cm Kg 0.4000 15,000.00 6,000.00
Minyak bekisting Liter 0.2000 7,500.00 1,500.00
Kayu Balok kelas II m3 0.0200 3,000,000.00 60,000.00
Plywood 9 mm Lbr 0.3500 -
Dolken kayu gelam φ(8-10) cm Batang 3.0000 25,000.00 75,000.00
Penjaga Jarak Begisting / Spacer Buah 4.0000 25,000.00 100,000.00
JUMLAH HARGA BAHAN 305,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 443,110.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 443,110.00

A.4.2.1.11.a. Pemasangan 1 m kusen pintu alluminium 3" (coklat/hitam)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0430 90,000.00 3,870.00
Tukang Khusus Allumunium L.O3 OH 0.0430 120,000.00 5,160.00
Kepala Tukang L.O3 OH 0.0043 120,000.00 516.00
Mandor L.O4 OH 0.0021 125,000.00 262.50
JUMLAH TENAGA KERJA 9,808.50
B BAHAN
Kusen Almunium 3"(coklat/hitam) m' 1.1000 150,000.00 165,000.00
Skrup fixer buah 2.0000 850.00 1,700.00
Sealant tube 0.0600 55,000.00 3,300.00
JUMLAH HARGA BAHAN 170,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 179,808.50
E Overhead & Profit 10% x D 17,980.85
F Harga Satuan Pekerjaan (D+E) 197,789.35

A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Page 51 of 78
A TENAGA
Pekerja L.O1 OH 0.0850 90,000.00 7,650.00
Tukang Khusus Allumunium L.O3 OH 0.0850 120,000.00 10,200.00
Kepala Tukang L.O3 OH 0.0090 120,000.00 1,080.00
Mandor L.O4 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 19,555.00
B BAHAN
Profil Pintu Alumunium m 4.4000 110,000.00 484,000.00
Profil kaca m 4.5000 9,500.00 42,750.00
Sealant tube 0.2700 55,000.00 14,850.00
JUMLAH HARGA BAHAN 541,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 561,155.00
E Overhead & Profit 10% x D 56,115.50
F Harga Satuan Pekerjaan (D+E) 617,270.50

A.4.2.1.13.a. Pemasangan 1 m2 Jendela rangka alluminium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0850 90,000.00 7,650.00
Tukang Khusus Allumunium L.O3 OH 0.0850 120,000.00 10,200.00
Kepala Tukang L.O3 OH 0.0090 120,000.00 1,080.00
Mandor L.O4 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 19,555.00
B BAHAN
Profil Jendela Alumunium m 4.4000 90,000.00 396,000.00
Profil kaca m 4.5000 9,500.00 42,750.00
Sealant tube 0.2700 55,000.00 14,850.00
JUMLAH HARGA BAHAN 453,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 473,155.00
E Overhead & Profit 10% x D 47,315.50
F Harga Satuan Pekerjaan (D+E) 520,470.50

A.4.2.1.21. Pemasangan 1 m2 Rangka Plafond Holow


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.3500 90,000.00 31,500.00
Tukang Kayu L.O3 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.11 OH 0.0350 120,000.00 4,200.00
Mandor L.15 OH 0.0180 125,000.00 2,250.00
JUMLAH TENAGA KERJA 72,950.00
B BAHAN
Besi Hollow Galvalum M 4.0000 6,250.00 25,000.00
Assesoris (100% rangka) Ls 100% 25,000.00 25,000.00

JUMLAH HARGA BAHAN 50,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 122,950.00
E Overhead & Profit 10% x D 12,295.00
F Harga Satuan Pekerjaan (D+E) 135,245.00

A.4.2.1.22. Pemasangan 1 m2 Rangka Atap Baja Ringan Zincalumne


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Page 52 of 78
A TENAGA
Pekerja L.O1 OH 0.7340 90,000.00 66,060.00
USER: Tukang Besi L.O3 OH 0.7340 120,000.00 88,080.00
Taso 5.1 Kg/btg
Kepala Tukang L.11 OH 0.0730 120,000.00 8,760.00
Mandor L.15 OH 0.0370 125,000.00 4,625.00
JUMLAH TENAGA KERJA 167,525.00
B BAHAN
Profil U.75-06 Kg 3.0650 15,755.00 48,289.08

JUMLAH HARGA BAHAN 48,289.08


C PERALATAN
Peralatan % 10.0000 48,289.08 4,828.91
JUMLAH HARGA ALAT 4,828.91
D Jumlah (A+B+C) 220,642.98
E Overhead & Profit 10% x D 22,064.30
F Harga Satuan Pekerjaan (D+E) 242,707.28

A.4.2.1.22.a Pemasangan 1 m2 Rangka Atap Baja Ringan Zincalumne


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.2500 90,000.00 22,500.00
Tukang Besi L.O3 OH 0.7500 120,000.00 90,000.00
Kepala Tukang L.11 OH 0.0750 120,000.00 9,000.00
Mandor L.15 OH 0.0100 125,000.00 1,250.00
JUMLAH TENAGA KERJA 122,750.00
B BAHAN
Profil U.75-06 Btg 0.4440 78,775.00 34,976.10
Profil Reng RT. 15 Btg 0.7110 29,900.00 21,258.90
Plat Perletakan Bh 0.1780 3,588.00 638.66
Plat Sudut Bh 0.0800 8,300.00 664.00
JUMLAH HARGA BAHAN 57,537.66
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 180,287.66

E. Harga Satuan Pekerjaan (D+E) 180,287.66

A.4.2.1.25. Pemasangan 1 m' Lisplank GRC 20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.2500 90,000.00 22,500.00
Tukang Besi L.O3 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.11 OH 0.0800 120,000.00 9,600.00
Mandor L.15 OH 0.0250 125,000.00 3,125.00
JUMLAH TENAGA KERJA 47,225.00
B BAHAN
Listplank GRC 20 cm m' 1.1000 50,000.00 55,000.00
Paku Skrup (50bh/kg) kg 0.0500 50,000.00 2,500.00
JUMLAH HARGA BAHAN 57,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 104,725.00

E. Harga Satuan Pekerjaan (D+E) 104,725.00

A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA

Page 53 of 78
Pekerja L.O1 OH 0.6000 90,000.00 54,000.00
Tukang Batu L.O2 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.O3 OH 0.0200 120,000.00 2,400.00
Mandor L.O4 OH 0.0300 125,000.00 3,750.00
JUMLAH TENAGA KERJA 84,150.00
B BAHAN
Batu bata m3 140.0000 400.00 56,000.00
Semen portland kg 26.5500 1,040.00 27,612.00
Pasir Pasang m3 0.0930 150,000.00 13,950.00
JUMLAH HARGA BAHAN 97,562.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 181,712.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 181,712.00

A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x9x18) cm tebal ½ batu campuran 1SP : 2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.3000 90,000.00 27,000.00
Tukang Batu L.O2 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 42,075.00
B BAHAN
Batu bata bh 83.0000 400.00 33,200.00
Semen portland kg 18.9500 1,040.00 19,708.00
Pasir Pasang m3 0.0380 150,000.00 5,700.00
JUMLAH HARGA BAHAN 58,608.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 100,683.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 100,683.00

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5 x 9 x 18) cm tebal ½ batu campuran 1SP :4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.3000 90,000.00 27,000.00
Tukang Batu L.O2 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 42,075.00
B BAHAN
Batu bata bh 70.0000 400.00 28,000.00
Semen portland kg 11.5000 1,040.00 11,960.00
Pasir Pasang m3 0.0430 150,000.00 6,450.00
JUMLAH HARGA BAHAN 46,410.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 88,485.00
E Overhead & Profit 10% x D 8,848.50
F Harga Satuan Pekerjaan (D+E) 97,333.50
dinding terawang (rooster) 12x11x24 campuran
1SP :4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.3000 90,000.00 27,000.00

Page 54 of 78
Tukang Batu L.O2 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 42,075.00
B BAHAN
Roster Beton bh 30.0000 25,000.00 750,000.00
Semen portland kg 11.0000 1,040.00 11,440.00
Pasir Pasang m3 0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 766,690.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 808,765.00

E. Harga Satuan Pekerjaan (D+E) 808,765.00

A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.3000 90,000.00 27,000.00
Tukang Batu L.O2 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.O3 OH 0.0150 120,000.00 1,800.00
Mandor L.O4 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 42,675.00
B BAHAN
Semen Portland Kg 10.2240 1,040.00 10,632.96
Pasir Pasang m3 0.0200 150,000.00 3,000.00
JUMLAH HARGA BAHAN 13,632.96
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 56,307.96
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 56,307.96

A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.3000 90,000.00 27,000.00
Tukang Batu L.O2 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.O3 OH 0.0150 120,000.00 1,800.00
Mandor L.O4 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 48,675.00
B BAHAN
Semen Portland Kg 6.2400 1,040.00 6,489.60
Pasir Pasang m3 0.0240 150,000.00 3,600.00
JUMLAH HARGA BAHAN 10,089.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 58,764.60
E Overhead & Profit 10% x D 5,876.46
F Harga Satuan Pekerjaan (D+E) 64,641.06

A.4.4.2.27. Pemasangan 1 m2 acian.


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.2000 90,000.00 18,000.00
Tukang Batu L.O2 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.0100 125,000.00 1,250.00

Page 55 of 78
JUMLAH TENAGA KERJA 32,450.00
B BAHAN
Semen Portland Kg 3.2500 1,040.00 3,380.00
JUMLAH HARGA BAHAN 3,380.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,830.00
E Overhead & Profit 10% x D 3,583.00
F Harga Satuan Pekerjaan (D+E) 39,413.00

A.4.4.3.35.Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.7000 90,000.00 63,000.00
Tukang Batu L.O2 OH 0.3500 120,000.00 42,000.00
Kepala Tukang L.O3 OH 0.0350 120,000.00 4,200.00
Mandor L.O4 OH 0.0350 125,000.00 4,375.00
JUMLAH TENAGA KERJA 113,575.00
B BAHAN
Keramik 30/30 Warna Bh 11.8700 6,000.00 71,220.00
Semen portland Kg 10.0000 1,040.00 10,400.00
Pasir Pasang m3 0.0450 150,000.00 6,750.00
Semen warna Kg 1.5000 2,000.00 3,000.00

JUMLAH HARGA BAHAN 91,370.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 204,945.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 204,945.00

A.4.4.3.35a. Pemasangan 1m2 lantai Granit ukuran 60 cm x 60 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.2400 90,000.00 21,600.00
Tukang Batu L.O2 OH 0.1200 120,000.00 14,400.00
Kepala Tukang L.O3 OH 0.0120 120,000.00 1,440.00
Mandor L.O4 OH 0.0120 125,000.00 1,500.00
JUMLAH TENAGA KERJA 38,940.00
B BAHAN
Granit Tile 60x60cm Bh 3.1000 78,700.00 243,970.00
Semen portland Kg 9.6000 1,040.00 9,984.00
Pasir Pasang m3 0.0450 150,000.00 6,750.00
Semen warna Kg 1.5000 2,000.00 3,000.00

JUMLAH HARGA BAHAN 263,704.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 302,644.00

E. Harga Satuan Pekerjaan (D+E) 302,644.00

A.4.4.3.35.b. Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.2500 90,000.00 22,500.00
Tukang Batu L.O2 OH 0.1250 120,000.00 15,000.00
Kepala Tukang L.O3 OH 0.0130 120,000.00 1,560.00

Page 56 of 78
Mandor L.O4 OH 0.0130 125,000.00 1,625.00
JUMLAH TENAGA KERJA 40,685.00
B BAHAN
Keramik 40/40 Warna Bh 6.6300 13,175.00 87,350.25
Semen portland Kg 9.8000 1,040.00 10,192.00
Pasir Pasang m3 0.0450 150,000.00 6,750.00
Semen warna Kg 1.3000 2,000.00 2,600.00

JUMLAH HARGA BAHAN 106,892.25


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 147,577.25
E. Overhead & Profit 10% x D 14,757.73
F. Harga Satuan Pekerjaan (D+E) 162,334.98

A.4.4.3.36.Pemasangan 1m2 lantai keramik ukuran 25cm x 25cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.7000 90,000.00 63,000.00
Tukang Batu L.O2 OH 0.3500 120,000.00 42,000.00
Kepala Tukang L.O3 OH 0.0350 120,000.00 4,200.00
Mandor L.O4 OH 0.0350 125,000.00 4,375.00
JUMLAH TENAGA KERJA 113,575.00
B BAHAN
Keramik 25/25 Kasar Bh 16.8000 3,750.00 63,000.00
Semen portland Kg 10.4000 1,040.00 10,816.00
Pasir Pasang m3 0.0450 150,000.00 6,750.00
Semen warna Kg 0.5000 2,000.00 1,000.00

JUMLAH HARGA BAHAN 81,566.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 195,141.00
E. Overhead & Profit 10% x D 19,514.10
F. Harga Satuan Pekerjaan (D+E) 214,655.10

A.4.4.3.39.Pemasangan 1 m’ plint Granit ukuran 10cm x 60cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0900 90,000.00 8,100.00
Tukang Batu L.O2 OH 0.0900 120,000.00 10,800.00
Kepala Tukang L.O3 OH 0.0350 120,000.00 4,200.00
Mandor L.O4 OH 0.0350 125,000.00 4,375.00
JUMLAH TENAGA KERJA 27,475.00
B BAHAN
Granit Plint 10 x 60 cm Bh 1.6667 14,583.00 24,305.49
Semen portland Kg 1.1400 1,040.00 1,185.60
Pasir Pasang m3 0.0030 150,000.00 450.00
Semen warna Kg 0.0250 2,000.00 50.00

JUMLAH HARGA BAHAN 25,991.09


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 53,466.09

E. Harga Satuan Pekerjaan (D+E) 53,466.09

A.4.4.3.39a.Pemasangan 1 m’ plint keramik ukuran 10cm x 40cm

Page 57 of 78
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0900 90,000.00 8,100.00
Tukang Batu L.O2 OH 0.0900 120,000.00 10,800.00
Kepala Tukang L.O3 OH 0.0350 120,000.00 4,200.00
Mandor L.O4 OH 0.0350 125,000.00 4,375.00
JUMLAH TENAGA KERJA 27,475.00
B BAHAN
Keramik Plin 10 x 40 cm Bh 2.5000 7,500.00 18,750.00
Semen portland Kg 1.1400 1,040.00 1,185.60
Pasir Pasang m3 0.0030 150,000.00 450.00
Semen warna Kg 0.0250 2,000.00 50.00

JUMLAH HARGA BAHAN 20,435.60


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 47,910.60

E. Harga Satuan Pekerjaan (D+E) 47,910.60

A.4.4.3.54.a.Pemasangan 1 m2 dinding keramik 25cm x 40cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.9000 90,000.00 81,000.00
Tukang Batu L.O2 OH 0.4500 120,000.00 54,000.00
Kepala Tukang L.O3 OH 0.0450 120,000.00 5,400.00
Mandor L.O4 OH 0.0450 125,000.00 5,625.00
JUMLAH TENAGA KERJA 146,025.00
B BAHAN
Keramik 25/40 Warna Bh 10.5000 7,500.00 78,750.00
Semen portland Kg 9.3000 1,040.00 9,672.00
Pasir Pasang m3 0.0180 150,000.00 2,700.00
Semen warna Kg 1.9400 2,000.00 3,880.00

JUMLAH HARGA BAHAN 95,002.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 241,027.00
E Overhead & Profit 10% x D 24,102.70
F Harga Satuan Pekerjaan (D+E) 265,129.70

A.4.4.3.54b.Pemasangan 1 m2 dinding keramik Motif


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.9000 90,000.00 81,000.00
Tukang Batu L.O2 OH 0.4500 120,000.00 54,000.00
Kepala Tukang L.O3 OH 0.0450 120,000.00 5,400.00
Mandor L.O4 OH 0.0450 125,000.00 5,625.00
JUMLAH TENAGA KERJA 146,025.00
B BAHAN
Keramik Motif Batu Alam 40/40 Bh 13.2500 13,333.33 176,666.62
Semen portland Kg 9.3000 1,040.00 9,672.00
Pasir Pasang m3 0.0180 150,000.00 2,700.00
Semen warna Kg 1.9400 2,000.00 3,880.00
JUMLAH HARGA BAHAN 192,918.62
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 338,943.62

Page 58 of 78
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 338,943.62

A.4.5.1.5a. Pemasangan 1 m2 langit-langit GRC ukuran (120 x 240) cm, tebal 4 mm


Harga Satuan Jumlah Harga
Kode Satuan
No Uraian Koefisien (Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.1000 90,000.00 9,000.00
Tukang Kayu L.O2 OH 0.0500 100,000.00 5,000.00
Kepala Tukang L.O3 OH 0.0050 120,000.00 600.00
Mandor L.O4 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 15,225.00
B BAHAN
GRC 4 mm Lembar 0.3640 50,000.00 18,200.00
Paku Skrup Kg 0.1100 50,000.00 5,500.00
JUMLAH HARGA BAHAN 23,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,925.00

E. Harga Satuan Pekerjaan (D+E) 38,925.00

A.4.5.1.5.b. Pemasangan 1 m2 langit-langit GRC ukuran (120 x 240) cm, tebal 8 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.1000 90,000.00 9,000.00
Tukang Kayu L.O2 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 20,825.00
B BAHAN
GRC 8 mm Lembar 0.3750 189,000.00 70,875.00
Paku Skrup Kg 0.0300 50,000.00 1,500.00
JUMLAH HARGA BAHAN 72,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 93,200.00
E Overhead & Profit 10% x D 9,320.00
F Harga Satuan Pekerjaan (D+E) 102,520.00

A.4.5.1.9. Pemasangan 1 m’ list langit-langit Kayu


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0500 90,000.00 4,500.00
Tukang Kayu L.O2 OH 0.0500 100,000.00 5,000.00
Kepala Tukang L.O3 OH 0.0050 120,000.00 600.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 10,475.00
B BAHAN
Lis Kayu Profil m 1.0500 15,000.00 15,750.00
Paku Triplek Kg 0.0100 25,000.00 250.00
JUMLAH HARGA BAHAN 16,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 26,475.00
E Overhead & Profit 10% x D 2,647.50
F Harga Satuan Pekerjaan (D+E) 29,122.50

Page 59 of 78
A.4.5.1.9.a. Pemasangan 1 m’ list Profil Gypsum
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0500 90,000.00 4,500.00
Tukang Kayu L.O2 OH 0.0500 100,000.00 5,000.00
Kepala Tukang L.O3 OH 0.0050 120,000.00 600.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 10,475.00
B BAHAN
List Gypsum 15 cm m 1.0500 20,000.00 21,000.00
Paku Sekrup Plafond (1000 Bh / Kg) Kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN 22,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,225.00
E Overhead & Profit 10% x D 3,322.50
F Harga Satuan Pekerjaan (D+E) 36,547.50

A.4.5.2.32. Pemasangan 1m² genteng metal 2 x 4 (8 Daun)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 90,000.00 18,000.00
Tukang kayu L.02 OH 0.1000 100,000.00 10,000.00
Kepala tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0010 125,000.00 125.00
JUMLAH TENAGA KERJA 29,325.00
B BAHAN
Genteng metal berpasir m2 1.0500 63,000.00 66,150.00
Paku 1 - 5 cm kg 0.2000 20,000.00 4,000.00

JUMLAH HARGA BAHAN 70,150.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 99,475.00
E Overhead & Profit 10% x D 9,947.50
F Harga Satuan Pekerjaan (D+E) 109,422.50

A.4.5.2.36. Pemasangan 1m' nok genteng metal / spandex


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 90,000.00 22,500.00
Tukang kayu L.02 OH 0.1500 100,000.00 15,000.00
Kepala tukang L.03 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0130 125,000.00 1,625.00
JUMLAH TENAGA KERJA 40,925.00
B BAHAN
Bubungan Bulat Genteng Zincalume polos lbr 1.1000 24,000.00 26,400.00
Paku 1 - 5 cm kg 0.0500 20,000.00 1,000.00

JUMLAH HARGA BAHAN 27,400.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 68,325.00
E Overhead & Profit 10% x D 6,832.50
F Harga Satuan Pekerjaan (D+E) 75,157.50

Page 60 of 78
A.4.5.2.43. Pemasangan 1 m’ nok datar atap spandek
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.1500 90,000.00 13,500.00
Tukang Kayu L.O3 OH 0.0700 100,000.00 7,000.00
Kepala Tukang L.11 OH 0.0070 120,000.00 840.00
Mandor L.15 OH 0.0060 125,000.00 750.00
JUMLAH TENAGA KERJA 22,090.00
B BAHAN
Talang jurai dalam Lapis Zinc Alumunium m' 1.1000 70,000.00 77,000.00
Paku Skrup kg 0.0400 50,000.00 2,000.00

JUMLAH HARGA BAHAN 79,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 101,090.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 101,090.00

A.4.5.2.45. Pemasangan 1 m2 Atap Spandek Polos


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.2000 90,000.00 18,000.00
Tukang Besi L.O3 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.11 OH 0.0100 120,000.00 1,200.00
Mandor L.15 OH 0.0010 125,000.00 125.00
JUMLAH TENAGA KERJA 31,325.00
B BAHAN
Spandek Metal Zincalume L=6m T=0,35mm m2 1.0200 68,000.00 69,360.00
Paku Skrup kg 0.2000 50,000.00 10,000.00
JUMLAH HARGA BAHAN 79,360.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 110,685.00

E. Harga Satuan Pekerjaan (D+E) 110,685.00

A.4.5.2.45.a Pemasangan 1 m2 Atap Spandek Pasir


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.2000 90,000.00 18,000.00
Tukang Besi L.O3 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.11 OH 0.0100 120,000.00 1,200.00
Mandor L.15 OH 0.0010 125,000.00 125.00
JUMLAH TENAGA KERJA 31,325.00
B BAHAN
Spandek Metal Pasir m2 1.0200 74,800.00 76,296.00
Paku Skrup kg 0.2000 50,000.00 10,000.00
JUMLAH HARGA BAHAN 86,296.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 117,621.00

E. Harga Satuan Pekerjaan (D+E) 117,621.00

Page 61 of 78
A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.2000 90,000.00 18,000.00
Tukang Kayu L.O3 OH 0.3000 100,000.00 30,000.00
Kepala Tukang L.O3 OH 0.0300 120,000.00 3,600.00
Mandor L.O4 OH 0.0100 125,000.00 1,250.00
JUMLAH TENAGA KERJA 52,850.00
B BAHAN
Kayu kasau kelas III M3 0.0163 2,000,000.00 32,600.00
Paku 5 – 10 cm kg 0.2500 15,000.00 3,750.00

JUMLAH HARGA BAHAN 36,350.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 89,200.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 89,200.00

A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0100 90,000.00 900.00
Tukang Kayu L.O3 OH 0.5000 100,000.00 50,000.00
Kepala Tukang L.O3 OH 0.0500 120,000.00 6,000.00
Mandor L.O4 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 57,525.00
B BAHAN
Kunci tanam 2x putar Lbr 1.0000 95,000.00 95,000.00

JUMLAH HARGA BAHAN 95,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 152,525.00

E. Harga Satuan Pekerjaan (D+E) 152,525.00

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0050 90,000.00 450.00
Tukang Kayu L.O3 OH 0.5000 100,000.00 50,000.00
Kepala Tukang L.O3 OH 0.0500 120,000.00 6,000.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 56,825.00
B BAHAN
Kunci pintu kamar mandi bh 1.0000 95,000.00 95,000.00

JUMLAH HARGA BAHAN 95,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 151,825.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 151,825.00

Page 62 of 78
A.4.6.2.4. Pemasangan 1 buah kunci silinder
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0050 90,000.00 450.00
Tukang Kayu L.O3 OH 0.5000 100,000.00 50,000.00
Kepala Tukang L.O3 OH 0.0500 120,000.00 6,000.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 56,825.00
B BAHAN
Kunci silinder bh 1.0000 178,000.00 178,000.00

JUMLAH HARGA BAHAN 178,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 234,825.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 234,825.00

A.4.6.2.5. Pemasangan 1 buah engsel pintu


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0150 90,000.00 1,350.00
Tukang Kayu L.O3 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.O3 OH 0.0150 120,000.00 1,800.00
Mandor L.O4 OH 0.0008 125,000.00 100.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Engsel Pintu bh 1.0000 45,000.00 45,000.00

JUMLAH HARGA BAHAN 45,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 63,250.00

E. Harga Satuan Pekerjaan (D+E) 63,250.00

A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0100 90,000.00 900.00
Tukang Kayu L.O3 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.0005 125,000.00 62.50
JUMLAH TENAGA KERJA 12,162.50
B BAHAN
Engsel Jendela bh 1.0000 35,000.00 35,000.00

JUMLAH HARGA BAHAN 35,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 47,162.50

E. Harga Satuan Pekerjaan (D+E) 47,162.50

Page 63 of 78
A.4.6.2.8a. Pemasangan 1 buah Grendel Jendela
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0100 90,000.00 900.00
Tukang Kayu L.O3 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.0005 125,000.00 62.50
JUMLAH TENAGA KERJA 12,162.50
B BAHAN
Grendel Jendela bh 1.0000 20,000.00 20,000.00

JUMLAH HARGA BAHAN 20,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 32,162.50

E. Harga Satuan Pekerjaan (D+E) 32,162.50

A.4.6.2.8b. Pemasangan 1 buah Grendel Pintu Panjang


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0100 90,000.00 900.00
Tukang Kayu L.O3 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.0005 125,000.00 62.50
JUMLAH TENAGA KERJA 12,162.50
B BAHAN
Grendel Pintu Panjang bh 1.0000 #N/A #N/A

JUMLAH HARGA BAHAN #N/A


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) #N/A
E Overhead & Profit 0% x D #N/A
F Harga Satuan Pekerjaan (D+E) #N/A

A.4.6.2.8c. Pemasangan 1 buah Grendel Pintu Tanam


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0150 90,000.00 1,350.00
Tukang Kayu L.O3 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.O3 OH 0.0150 120,000.00 1,800.00
Mandor L.O4 OH 0.0080 125,000.00 1,000.00
JUMLAH TENAGA KERJA 19,150.00
B BAHAN
Grendel Pintu tanam bh 1.0000 124,000.00 124,000.00

JUMLAH HARGA BAHAN 124,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 143,150.00
E Overhead & Profit 0% x D -

Page 64 of 78
F Harga Satuan Pekerjaan (D+E) 143,150.00

A.4.6.2.8d. Pemasangan 1 buah Grendel Pintu Tanam Alumunium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0150 90,000.00 1,350.00
Tukang Kayu L.O3 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.O3 OH 0.0150 120,000.00 1,800.00
Mandor L.O4 OH 0.0080 125,000.00 1,000.00
JUMLAH TENAGA KERJA 19,150.00
B BAHAN
Grendel Pintu tanam alumunium bh 1.0000 124,000.00 124,000.00

JUMLAH HARGA BAHAN 124,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 143,150.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 143,150.00

A.4.6.2.9. Pemasangan 1 buah kait angin


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0150 90,000.00 1,350.00
Tukang Kayu L.O3 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.O3 OH 0.0150 120,000.00 1,800.00
Mandor L.O4 OH 0.0080 125,000.00 1,000.00
JUMLAH TENAGA KERJA 19,150.00
B BAHAN
Hak Angin / pengkait bh 1.0000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 25,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 44,150.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 44,150.00

A.4.6.2.10. Pemasangan 1 buah door closer


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0500 90,000.00 4,500.00
Tukang Kayu L.O3 OH 0.5000 100,000.00 50,000.00
Kepala Tukang L.O3 OH 0.0500 120,000.00 6,000.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 60,875.00
B BAHAN
Door closer bh 1.0000 250,000.00 250,000.00

JUMLAH HARGA BAHAN 250,000.00


C PERALATAN

Page 65 of 78
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 310,875.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 310,875.00

A.4.6.2.11. Pemasangan 1 buah kunci slot


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0200 90,000.00 1,800.00
Tukang Kayu L.O3 OH 0.2000 100,000.00 20,000.00
Kepala Tukang L.O3 OH 0.0200 120,000.00 2,400.00
Mandor L.O4 OH 0.0010 125,000.00 125.00
JUMLAH TENAGA KERJA 24,325.00
B BAHAN
Kunci slot bh 1.0000 95,000.00 95,000.00
JUMLAH HARGA BAHAN 95,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 119,325.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 119,325.00

A.4.6.2.12. Pemasangan 1 buah Door holder


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0500 90,000.00 4,500.00
Tukang Kayu L.O3 OH 0.5000 100,000.00 50,000.00
Kepala Tukang L.O3 OH 0.0500 120,000.00 6,000.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 60,875.00
B BAHAN
Door Holder bh 1.0000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 105,875.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 105,875.00

A.4.6.2.13. Pemasangan 1 buah door stop


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0100 90,000.00 900.00
Tukang Kayu L.O3 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 12,725.00
B BAHAN
Door stop bh 1.0000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 57,725.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 57,725.00

A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Page 66 of 78
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0150 90,000.00 1,350.00
Tukang Kayu L.O3 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.O3 OH 0.0150 120,000.00 1,800.00
Mandor L.O4 OH 0.0008 125,000.00 100.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaca Bening 5mm M2 1.1000 160,000.00 176,000.00
Sealant tube 0.0500 55,000.00 2,750.00
Kaca Rayban 5mm M2 1.0500 76,700.00

JUMLAH HARGA BAHAN 178,750.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 197,000.00
E Overhead & Profit 10% x D 19,700.00
F Harga Satuan Pekerjaan (D+E) 216,700.00

Page 67 of 78
A.4.6.2.17.a. Pemasangan 1 m2 kaca tebal 8 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0150 90,000.00 1,350.00
Tukang Kayu L.O3 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.O3 OH 0.0150 120,000.00 1,800.00
Mandor L.O4 OH 0.0008 125,000.00 100.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaca Bening 8mm M2 1.1000 175,000.00 192,500.00
Sealant tube 0.0500 55,000.00 2,750.00
Kaca Rayban 8mm M2 1.0500 144,000.00

JUMLAH HARGA BAHAN 195,250.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 213,500.00
E Overhead & Profit 10% x D 21,350.00
F Harga Satuan Pekerjaan (D+E) 234,850.00

A.4.6.2.19. Pemasangan 1 m2 kaca temperet 12 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0165 90,000.00 1,485.00
Tukang Kayu L.O3 OH 0.1650 100,000.00 16,500.00
Kepala Tukang L.O3 OH 0.0165 120,000.00 1,980.00
Mandor L.O4 OH 0.0008 125,000.00 100.00
JUMLAH TENAGA KERJA 20,065.00
B BAHAN
Kaca Temperet 12mm M2 1.1000 750,000.00 825,000.00
Sealant tube 0.0500 55,000.00 2,750.00

JUMLAH HARGA BAHAN 827,750.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 847,815.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 847,815.00

A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat
penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0700 90,000.00 6,300.00
Tukang Cat L.O3 OH 0.1050 120,000.00 12,600.00
Kepala Tukang L.O3 OH 0.0040 120,000.00 480.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 19,755.00
B BAHAN
Cat Meni kayu/besi kg 0.2000 45,000.00 9,000.00
Plamir kayu / besi kg 0.1500 50,000.00 7,500.00
Cat dasar kg 0.1700 70,000.00 11,900.00
Cat Penutup Interior kg 0.3500 80,000.00 28,000.00
Kuas cat bh 0.0100 25,000.00 250.00
Pengencer/thinner kg 0.0300 19,000.00 570.00
Amplas lbr 0.2000 11,000.00 2,200.00

Page 68 of 78
JUMLAH HARGA BAHAN 59,420.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 79,175.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 79,175.00

A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0200 90,000.00 1,800.00
Tukang Cat L.O3 OH 0.0630 120,000.00 7,560.00
Kepala Tukang L.O3 OH 0.0063 120,000.00 756.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 10,491.00
B BAHAN
Plamir Tembok kg 0.1000 25,000.00 2,500.00
Cat dasar kg 0.1000 70,000.00 7,000.00
Cat penutup Interior kg 0.2600 80,000.00 20,800.00
JUMLAH HARGA BAHAN 30,300.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 40,791.00
E Overhead & Profit 10% x D 4,079.10
F Harga Satuan Pekerjaan (D+E) 44,870.10

A.4.7.1.10a. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) eksterior
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0200 90,000.00 1,800.00
Tukang Cat L.O3 OH 0.0630 120,000.00 7,560.00
Kepala Tukang L.O3 OH 0.0063 120,000.00 756.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 10,491.00
B BAHAN
Cat Alkali kg 0.1000 60,000.00 6,000.00
Cat Penutup Eksterior kg 0.2600 150,000.00 39,000.00
JUMLAH HARGA BAHAN 45,000.00
D Jumlah (A+B+C) 55,491.00

E. Harga Satuan Pekerjaan (D+E) 55,491.00

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0200 90,000.00 1,800.00
Tukang Cat L.O3 OH 0.2000 120,000.00 24,000.00
Kepala Tukang L.O3 OH 0.0200 120,000.00 2,400.00
Mandor L.O4 OH 0.0025 125,000.00 312.50
JUMLAH TENAGA KERJA 28,512.50
B BAHAN
Cat Meni kayu/besi Kg 0.1000 45,000.00 4,500.00
Kuas cat bh 0.0100 25,000.00 250.00

JUMLAH HARGA BAHAN 4,750.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,262.50

Page 69 of 78
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 33,262.50

A.5.1.1 1. Pemasangan 1 buah closet Duduk/monoblock


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 3.3000 90,000.00 297,000.00
Tukang batu L.O3 OH 1.1000 120,000.00 132,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.1600 125,000.00 20,000.00
JUMLAH TENAGA KERJA 450,200.00
B BAHAN
Kloset Duduk unit 1.0000 1,950,000.00 1,950,000.00
Perlengkapan Ls 6% x closet 1,950,000.00 117,000.00

JUMLAH HARGA BAHAN 2,067,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,517,200.00
E Overhead & Profit 10% x D 251,720.00
F Harga Satuan Pekerjaan (D+E) 2,768,920.00

A.5.1.1 2. Pemasangan 1 buah closet jongkok keramik


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 1.0000 90,000.00 90,000.00
Tukang batu L.O3 OH 1.5000 120,000.00 180,000.00
Kepala Tukang L.O3 OH 0.1500 120,000.00 18,000.00
Mandor L.O4 OH 0.1600 125,000.00 20,000.00
JUMLAH TENAGA KERJA 308,000.00
B BAHAN
Kloset Jongkok Keramik unit 1.0000 350,000.00 350,000.00
Semen portland kg 6.0000 1,040.00 6,240.00
Pasir pasang m3 0.0100 150,000.00 1,500.00
JUMLAH HARGA BAHAN 357,740.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 665,740.00
E Overhead & Profit 10% x D 66,574.00
F Harga Satuan Pekerjaan (D+E) 732,314.00

A.5.1.1 5. Pemasangan 1 buah washtafel keramik lengkap


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 1.2000 90,000.00 108,000.00
Tukang batu L.O3 OH 1.4500 120,000.00 174,000.00
Kepala Tukang L.O3 OH 0.1500 120,000.00 18,000.00
Mandor L.O4 OH 0.0600 125,000.00 7,500.00
JUMLAH TENAGA KERJA 307,500.00
B BAHAN
Washtafel keramik lengkap unit 1.0000 645,000.00 645,000.00
Semen Portland kg 6.0000 1,040.00 6,240.00
Pasir Pasang m3 0.0100 150,000.00 1,500.00
JUMLAH HARGA BAHAN 652,740.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 960,240.00

Page 70 of 78
E. Harga Satuan Pekerjaan (D+E) 960,240.00

A.5.1.1 22.a Pemasangan 1 m’ pipa Galvanis 2"


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.1080 90,000.00 9,720.00
Tukang pipa L.O3 OH 0.1800 120,000.00 21,600.00
Kepala Tukang L.O3 OH 0.0180 120,000.00 2,160.00
Mandor L.O4 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 34,105.00
B BAHAN
Pipa Galvanis Ø 2" M 1.0000 460,000.00 460,000.00
Perlengkapan 35% pipa % 35.00 460,000.00 161,000.00
JUMLAH HARGA BAHAN 621,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 655,105.00
E Overhead & Profit 10% x D 65,510.50
F Harga Satuan Pekerjaan (D+E) 720,615.50

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0360 90,000.00 3,240.00
Tukang pipa L.O3 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.O3 OH 0.0060 120,000.00 720.00
Mandor L.O4 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 11,410.00
B BAHAN
Pipa PVC Ø 1/2" M 1.2000 6,625.00 7,950.00
Perlengkapan 35% pipa 35% 6,625.00 2,318.75
JUMLAH HARGA BAHAN 10,268.75
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,678.75
E Overhead & Profit 10% x D 2,167.88
F Harga Satuan Pekerjaan (D+E) 23,846.63

A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0360 90,000.00 3,240.00
Tukang pipa L.O3 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.O3 OH 0.0060 120,000.00 720.00
Mandor L.O4 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 11,410.00
B BAHAN
Pipa PVC Ø 3/4" M 1.2000 31,000.00 37,200.00
Perlengkapan 35% pipa 35% 31,000.00 10,850.00
JUMLAH HARGA BAHAN 48,050.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 59,460.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 59,460.00

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”

Page 71 of 78
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0360 90,000.00 3,240.00
Tukang pipa L.O3 OH 0.0600 120,000.00 7,200.00
Kepala Tukang L.O3 OH 0.0060 120,000.00 720.00
Mandor L.O4 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 11,410.00
B BAHAN
Pipa PVC Ø 1" M 1.2000 43,000.00 51,600.00
Perlengkapan 35% pipa 35% 43,000.00 15,050.00
JUMLAH HARGA BAHAN 66,650.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 78,060.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 78,060.00

A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0540 90,000.00 4,860.00
Tukang batu L.O3 OH 0.0900 120,000.00 10,800.00
Kepala Tukang L.O3 OH 0.0090 120,000.00 1,080.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 17,115.00
B BAHAN
Pipa PVC Ø 1,5" M 1.2000 23,300.00 27,960.00
Perlengkapan 35% pipa 35% 23,300.00 8,155.00
JUMLAH HARGA BAHAN 36,115.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 53,230.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 53,230.00

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0540 90,000.00 4,860.00
Tukang batu L.O3 OH 0.0900 120,000.00 10,800.00
Kepala Tukang L.O3 OH 0.0090 120,000.00 1,080.00
Mandor L.O4 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 17,115.00
B BAHAN
Pipa PVC Ø 2" M 1.2000 95,000.00 114,000.00
Perlengkapan 35% pipa 35% 95,000.00 33,250.00
JUMLAH HARGA BAHAN 147,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 164,365.00
E Overhead & Profit 10% x D 16,436.50
F Harga Satuan Pekerjaan (D+E) 180,801.50

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0810 90,000.00 7,290.00
Tukang batu L.O3 OH 0.1350 120,000.00 16,200.00

Page 72 of 78
Kepala Tukang L.O3 OH 0.0135 120,000.00 1,620.00
Mandor L.O4 OH 0.0040 125,000.00 500.00
JUMLAH TENAGA KERJA 25,610.00
B BAHAN
Pipa PVC Ø 2 1/2" M 1.2000 79,000.00 94,800.00
Perlengkapan 35% pipa 35% 79,000.00 27,650.00
JUMLAH HARGA BAHAN 122,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 148,060.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 148,060.00

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0810 90,000.00 7,290.00
Tukang batu L.O3 OH 0.1350 120,000.00 16,200.00
Kepala Tukang L.O3 OH 0.0135 120,000.00 1,620.00
Mandor L.O4 OH 0.0040 125,000.00 500.00
JUMLAH TENAGA KERJA 25,610.00
B BAHAN
Pipa PVC Ø 3" M 1.2000 195,000.00 234,000.00
Perlengkapan 35% pipa 35% 195,000.00 68,250.00
JUMLAH HARGA BAHAN 302,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 327,860.00
E Overhead & Profit 10% x D 32,786.00
F Harga Satuan Pekerjaan (D+E) 360,646.00

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0810 90,000.00 7,290.00
Tukang batu L.O3 OH 0.1350 120,000.00 16,200.00
Kepala Tukang L.O3 OH 0.0135 120,000.00 1,620.00
Mandor L.O4 OH 0.0040 125,000.00 500.00
JUMLAH TENAGA KERJA 25,610.00
B BAHAN
Pipa PVC Ø 4" M 1.2000 324,000.00 388,800.00
Perlengkapan 35% pipa 35% 324,000.00 113,400.00
JUMLAH HARGA BAHAN 502,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 527,810.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 527,810.00

A.5.1.1.19. Pemasangan 1 buah kran diameter ½” atau 3/4”


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0100 90,000.00 900.00
Tukang batu L.O3 OH 0.4000 120,000.00 48,000.00
Kepala Tukang L.O3 OH 0.0400 120,000.00 4,800.00
Mandor L.O4 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 54,325.00
B BAHAN
Kran air stainless Ø 1/2" M 1.0000 70,000.00 70,000.00

Page 73 of 78
Seal tape bh 0.0250 5,000.00 125.00
JUMLAH HARGA BAHAN 70,125.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 124,450.00
E Overhead & Profit 10% x D 12,445.00
F Harga Satuan Pekerjaan (D+E) 136,895.00

A.4.4.3.60.Pemasangan 1 m2 wallpaper lebar 50 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.3500 90,000.00 31,500.00
Tukang Batu L.O2 OH 0.1750 120,000.00 21,000.00
Kepala Tukang L.O3 OH 0.0170 120,000.00 2,040.00
Mandor L.O4 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 54,790.00
B BAHAN
Wallpaper m 2.2000 19,890.00 43,758.00
Lem Plastik / Kayu Kg 0.2500 45,000.00 11,250.00
JUMLAH HARGA BAHAN 55,008.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 109,798.00
E Overhead & Profit 10% x D 10,979.80
F Harga Satuan Pekerjaan (D+E) 120,777.80

A.4.4.3.46.a Pelapisan 1 m2 HPL


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.7000 90,000.00 63,000.00
Tukang Kayu L.O2 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.O3 OH 0.0350 120,000.00 4,200.00
Mandor L.O4 OH 0.0350 125,000.00 4,375.00
JUMLAH TENAGA KERJA 106,575.00
B BAHAN
HPL Panel Lembar 0.3800 150,000.00 57,000.00
Lem Plastik / Kayu Kg 0.6000 45,000.00 27,000.00

JUMLAH HARGA BAHAN 84,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 190,575.00
E Overhead & Profit 10% x D 19,057.50
F Harga Satuan Pekerjaan (D+E) 209,632.50

A.4.4.3.45.Pemasangan 1 m2 underlayer (pelapis bawah karpet)


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.1200 90,000.00 10,800.00
Tukang Batu L.O2 OH 0.1200 120,000.00 14,400.00
Kepala Tukang L.O3 OH 0.0120 120,000.00 1,440.00
Mandor L.O4 OH 0.0060 125,000.00 750.00
JUMLAH TENAGA KERJA 27,390.00
B BAHAN
Underlayer m2 1.0500 85,000.00 89,250.00
Lem Plastik / Kayu Kg 0.3500 45,000.00 15,750.00
JUMLAH HARGA BAHAN 105,000.00
C PERALATAN

Page 74 of 78
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 132,390.00
E Overhead & Profit 10% x D 13,239.00
F Harga Satuan Pekerjaan (D+E) 145,629.00

A.4.4.3.44.Pemasangan 1 m2 lantai karpet


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.1700 90,000.00 15,300.00
Tukang Batu L.O2 OH 0.1700 120,000.00 20,400.00
Kepala Tukang L.O3 OH 0.0170 120,000.00 2,040.00
Mandor L.O4 OH 0.0090 125,000.00 1,125.00
JUMLAH TENAGA KERJA 38,865.00
B BAHAN
Karpet Lantai setara Crown m2 1.0500 250,000.00 262,500.00
Lem Plastik / Kayu Kg 0.3500 45,000.00 15,750.00

JUMLAH HARGA BAHAN 278,250.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 317,115.00
E Overhead & Profit 10% x D 31,711.50
F Harga Satuan Pekerjaan (D+E) 348,826.50

A.4.5.1.26.a Pemasangan 1 m2 Dinding Pemisah Gypsum Board 2 sisi + Rangka Canal Baja Ringan
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.4500 90,000.00 40,500.00
Tukang Kayu L.O2 OH 0.4000 100,000.00 40,000.00
Kepala Tukang L.O3 OH 0.0400 120,000.00 4,800.00
Mandor L.O4 OH 0.0230 125,000.00 2,875.00
JUMLAH TENAGA KERJA 88,175.00
B BAHAN
Gypsum Board tebal 9 mm Lbr 0.7200 65,000.00 46,800.00
Paku Skrup (50bh/kg) Bh 30.0000 1,000.00 30,000.00
Profil U.75-06 Btg 0.6670 78,775.00 52,542.93
JUMLAH HARGA BAHAN 129,342.93
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 217,517.93
E Overhead & Profit 10% x D 21,751.79
F Harga Satuan Pekerjaan (D+E) 239,269.72

A.5.1.1.14. Pemasangan 1 buah floor drain


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.O1 OH 0.0100 90,000.00 900.00
Tukang batu L.O3 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.O3 OH 0.0100 120,000.00 1,200.00
Mandor L.O4 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 14,725.00
B BAHAN
Saringan Air / Floor drain stainless bh 1.0000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 100,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 114,725.00
E Overhead & Profit 10% x D 11,472.50

Page 75 of 78
F Harga Satuan Pekerjaan (D+E) 126,197.50

A.6.1.1.1 Titik Instalasi Listrik


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Instalatur Listrik OH 0.3200 150,000.00 48,000.00
Asisten Instalatur Listrik OH 0.1600 125,000.00 20,000.00
JUMLAH TENAGA KERJA 68,000.00
B BAHAN
Kabel Listrik NYM 3 x 2,5 mm m' 15.0000 15,000.00 225,000.00
Acsesoris Dihitung 30% Dari Bahan 30% 15,000.00 4,500.00
JUMLAH HARGA BAHAN 229,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 297,500.00
E Overhead & Profit 10% x D 29,750.00
F Harga Satuan Pekerjaan (D+E) 327,250.00

L.08 Pasang 1 buah fitting lampu SL


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Instalatur Listrik OH 0.1000 150,000.00 15,000.00
Kepala tukang OH 0.0500 120,000.00 6,000.00
Mandor OH 0.0300 125,000.00 3,750.00
JUMLAH TENAGA KERJA 33,750.00
B BAHAN
Fitting Lampu bh 1.000 20,000.00 20,000.00
Isolasi bh 0.250 5,000.00 1,250.00
JUMLAH HARGA BAHAN 21,250.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 55,000.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 55,000.00

A.6.1.1.2 Pas. Saklar Tripel


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Instalatur Listrik OH 0.3200 150,000.00 48,000.00
Asisten Instalatur Listrik OH 0.1600 125,000.00 20,000.00
JUMLAH TENAGA KERJA 68,000.00
B BAHAN
Saklar Triple kualitas baik BH 1.0000 60,000.00 60,000.00

JUMLAH HARGA BAHAN 60,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 128,000.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 128,000.00

A.6.1.1.3 Pas. Saklar Double


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Page 76 of 78
A TENAGA
Instalatur Listrik OH 0.3200 150,000.00 48,000.00
Asisten Instalatur Listrik OH 0.1600 125,000.00 20,000.00
JUMLAH TENAGA KERJA 68,000.00
B BAHAN
Saklar Double kualitas baik BH 1.0000 50,000.00 50,000.00

JUMLAH HARGA BAHAN 50,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 118,000.00
E Overhead & Profit 10% x D 11,800.00
F Harga Satuan Pekerjaan (D+E) 129,800.00

A.6.1.1.4 Pas. Saklar Single


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Instalatur Listrik OH 0.3200 150,000.00 48,000.00
Asisten Instalatur Listrik OH 0.1600 125,000.00 20,000.00
JUMLAH TENAGA KERJA 68,000.00
B BAHAN
Saklar Single kualitas baik BH 1.0000 40,000.00 40,000.00

JUMLAH HARGA BAHAN 40,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 108,000.00
E Overhead & Profit 10% x D 10,800.00
F Harga Satuan Pekerjaan (D+E) 118,800.00

A.6.1.1.5 Pas. Stop Kontak


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Instalatur Listrik OH 0.3200 150,000.00 48,000.00
Asisten Instalatur Listrik OH 0.1600 125,000.00 20,000.00
JUMLAH TENAGA KERJA 68,000.00
B BAHAN
Stop Kontak BH 1.0000 20,000.00 20,000.00

JUMLAH HARGA BAHAN 20,000.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 88,000.00
E Overhead & Profit 10% x D 8,800.00
F Harga Satuan Pekerjaan (D+E) 96,800.00

A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam / batu alam andesit


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.7000 90,000.00 63,000.00
Tukang Batu OH 0.3500 120,000.00 42,000.00
Kepala tukang OH 0.0350 120,000.00 4,200.00
Mandor OH 0.0035 125,000.00 437.50
JUMLAH TENAGA KERJA 109,637.50
B BAHAN

Page 77 of 78
Batu Alam Andesit M2 1.1000 160,500.00 176,550.00
Semen portland M2 11.7500 1,040.00 12,220.00
Pasir Pasang M2 0.0350 150,000.00 5,250.00
JUMLAH HARGA BAHAN 194,020.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 303,657.50
E Overhead & Profit 10% x D 30,365.75
F Harga Satuan Pekerjaan (D+E) 334,023.25

Supl. A.4.4.3.64.a. Pemasangan 1 m2 paving block natural tebal 6 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.2500 90,000.00 22,500.00
Kepala tukang OH 0.0500 120,000.00 6,000.00
Mandor OH 0.0013 125,000.00 162.50
JUMLAH TENAGA KERJA 28,662.50
B BAHAN
Paving Block T = 6 Cm Bh 28.5000 2,000.00 57,000.00
Pasir beton M3 0.0500 250,000.00 12,500.00
JUMLAH HARGA BAHAN 69,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 98,162.50

E. Harga Satuan Pekerjaan (D+E) 98,162.50

Page 78 of 78