1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
20
40
60
80
0 10 20 30 40 50
0
0 0
0.00 - 1.30 m
1 95 Lanau kepasiran, coklat muda, lembab,
ML
plastistas rendah, kepadatan lembek, ML,kelulusan
HQ 89 mm
tinggi
1 1 1
2 90
karena
2 2 2
4-May-11
2 2 2 5 9 material
1.30 - 6.00 m SM berupa
Pasir kelanauan, pasir kasar, lepas, coklat, pasir
lembab, SM,
terdapat 5 - 7 % gravel, bulat, agak menyudut,
berupa butiran batu apung, lunak , putih
3 95
kecoklatan, diameter 0.5 - 2 cm, kelulusan tinggi
3 3
23.61 2.57 NP G = 14.21 % = 25.95 O SM
3
Pengujian
S= 65.80 % konsoliasi Pasir Berlanau
M= 18.89 % c = 0.0155 tidak
C= 1.10 %
kg/cm 2 dilakukan
HQ 89 mm
karena
material
berupa
pasir
SINGLE BARREL - NQ - 73", widia bit
4 4 92 4 4
5 5 karena 5
material
berupa
1 90 pasir
6 6 6
4 4 3 6 13
6.00 - 8.00 m
Pasir , pasir sedang, lepas, hitam abu, basah, SP, SP
HQ 89 mm
terdapat < 3 % gravel, bulat, agak menyudut, 26.71 2.58 NP G = 2.45 % = 22.21 O Pengujian SP
berupa butiran batu apung, lunak , putih S= 88.76 % konsoliasi Pasir Gradasi Buruk
2 95 kecoklatan, diameter 0.5 - 1 cm, kelulusan tinggi M= 7.90 % c = 0.01825 tidak
C= 0.90 %
kg/cm 2 dilakukan
7 7 karena 7
5-May-11
material
berupa
pasir LABORATORIUM GEOTEKNIK
DAN GEODESI
JURUSAN TEKNIK SIPIL
3 90 FAKULTAS TEKNIK
UNIVERSITAS MATARAM
HQ 89 mm
8 8 8
9 10 11 10 31
8.00 - 9.00 m
Pasir kelanauan, basah, pasir sedang, agak padat, SM
coklat muda, SM, terdapat < 3% gravel, bulat, agak BOR LOG PENGEBORAN INTI
4 95 menyudut, berupa butiran batu apung, lunak , putih 26.63 2.53 NP G = 1.10 % = 34.87 O Pengujian SP ISLAMIC CENTER
kecoklatan, diameter ,0.5 - 1 cm, kelulusan tinggi S= 91.67 % konsoliasi Pasir Gradasi Buruk
M= 7.05 % c = 0.0145 tidak
C= 0.18 %
kg/cm 2 dilakukan
9 9 karena 9 PROYEK : INVESTIGASI GEOLOGI DAN
material SOIL TEST BANGUNAN MASJID
9.00 - 10.00 m
HQ Æ 89 mm
10 10 10
4 4 6 5 15
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
0
0 Nilai spt
0 kedalaman Nilai N
0 0 0
0 2 9
0 4.5 16
0 6 13
0 8 31
0 10 15
0
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
0 10 20 30 40 50
20
40
60
80
0
10
10 HQ Æ 89 4 4 6 5 15
mm
11 11 karena 11
material
berupa
5-May-11
pasir
7 95
12 10.00 - 15.00 m 2 2 3 5 10
12
31.42 2.59 NP G = 0.60 % = 29.25 O SP
12
Pengujian
Pasir , pasir halus - sedang, basah, lepas, hitam SP S= 90.16 % konsoliasi Pasir Gradasi Buruk
,abu, SP, gradasi seragam, kelulusan tinggi M= 9.08% c = 0.083 tidak
C= 0.160 % kg/cm 2 dilakukan
HQ 89 mm
8 95 karena
material
berupa
pasir
13 13 13
1 95
HQ 89 mm
SINGLE BARREL - NQ - 73", widia bit
14 14 14
3 3 3 5 11 32.70 2.59 NP G = 0.34 % = 28.41 O Pengujian SP
S= 92.80 % konsoliasi Pasir Gradasi Buruk
2 95 M= 6.76 % c = 0.003 tidak
C= 0.10 %
kg/cm 2 dilakukan
karena
material
berupa
pasir
15 15 15
15.00 - 15.70 m
3 90 Pasir kelanauan, pasir halus ,basah, lepas, SM
6-May-11
MH
15.70 - 16.00 m
16 Lanau kelempungan, plastisitas tinggi, basah, 16 16
hitam, kepadatan lembek, MH, kelulusan tinggi 2 2 1 1 4 30.81 2.6 PL= 34.57 G = 0.11 % = 23 O Pengujian SM
LL= 43.23 S= 74.80 % konsoliasi Pasir kelanauan
IP= 8.66 M= 24.29 % c = 0.039 tidak
16.00 - 18.60 m C= 0.80 %
kg/cm 2 dilakukan
4 95 SP karena
Pasir , pasir halus - sedang, lepas, basah, hitam material
abu, SP, gradasi seragam, kelulusan tinggi berupa
pasir
HQ 89 mm
17 17 17
LABORATORIUM GEOTEKNIK
5 95 DAN GEODESI
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
18
UNIVERSITAS MATARAM
18 18
1 1 1 1 3 31.96 2.63 PL= 37.89 G = 0.08 % = 13.57 O Cv=0.0048 ML
LL= 43.72 S= 46.07 % Cc=0.2784 Lanau Kepasiran
1 95 IP= 5.83 M= 52.77% c = 0.108 eo=1.3779
C= 1.08 % k= 7.09E-0.8
kg/cm 2 BOR LOG PENGEBORAN INTI
HQ 89 mm
ISLAMIC CENTER
18.60 - 19.00 m ML
7-May-11
kelulusan rendah
20 20 20
1 1 5 3 9
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 10 15
0 12 10
0 14 11
0 16 4
0 18 3
0 20 9
0
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BORING NO : BH-1
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 30-Apr-10
LOCATION : MATARAM - NTB COMPLETION DATE : 30-May-10
GROUND ELEVATION : m DRILLER : Mr. UDIN
COORDINATES : S. 8o 34' 48.45" , E. 116o 6' 6.08" X = 401.147.85 , Y = 9.051.439,65 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.80 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
20
40
60
80
0 10 20 30 40 50
0
20
20 1 1 5 3 9 33.52 2.55 PL= 29.32 G = 0.11 % = 26.83 O Pengujian SM
LL= 44.83 S= 80.39 % Pasir Kelanauan
HQ Æ 89 mm
konsoliasi
20.00 - 21.60 m SM IP= 15.51 M= 19.33 % c = 0.001 tidak
Pasir kelanauan, pasir halus , lepas, hitam abu, C= 0.16 %
kg/cm 2 dilakukan
3 95 SM, basah, gradasi seragam, kelulusan tinggi karena
material
berupa
pasir
21 21 21
HQ 89 mm
4 95
7-May-11
21.60 - 24.00 m
22 Lempung kelanauan, plastisitas tinggi, 22 22
4 6 6 9 21 60.14 2.7 PL= 27.56 G = 0.08 % = 12.31 O Cv=0.0026 CH
hitam, kepadatan agak padat, basah, CH, CH LL= 63.07 S= 10.60 % Cc=0.3278 Lempung Kelanauan
IP= 35.51 M= 59.42 % c = 0.466 eo=1.6790 Plastisitas Tinggi
kelulusan rendah C= 29.91 % k= 4.28E-0.8
kg/cm 2
5 95
HQ 89 mm
23 23 23
6 95
SINGLE BARREL - NQ - 73", widia bit
24 24 24
4 7 6 7 20 31.67 2.66 PL= 28.88 G = 1.25 % = 15.54 O Cv=0.0046 ML
LL= 39.23 S= 45.52 % Cc=0.3156 Lanau Berpasir,
IP= 10.35 M= 52.13 % c = 0.21 eo=1.2369 Plastisitas sedang
C= 1.10 % k= 1.87E-0.7
kg/cm 2
HQ 89 mm
1 95
24.00 - 25.50 m
ML
Lanau kerikilan, plastisitas rendah, coklat muda,
kepadatan agak padat, basah, ML, setempat
25 kerakal batuapung Ø 6 cm, kaku, kelulusan 25 25
rendah
2 95
HQ 89 mm
26 26 26
5 3 3 5 11 29.86 2.59 NP G = 4.88 % = 25.90 O Pengujian SM
25.50 - 28.30 m S= 80.33 % konsoliasi Pasir Kelanauan
M= 14.50 % c = 0.035 tidak
Pasir kelanauan, pasir halus , sangat ,padat, hitam C= 0.29 %
kg/cm 2 dilakukan
abu, SM, basah, gradasi seragam, kelulusan tinggi SM karena
material
berupa
3 95
8-May-11
pasir
27 27 27
LABORATORIUM GEOTEKNIK
DAN GEODESI
HQ 89 mm
30 30 30
13 13 14 20 47
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 20 9
0 22 21
0 24 20
0 26 11
0 28 50
0 30 50
0
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BORING NO : BH-1
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 30-Apr-10
LOCATION : MATARAM - NTB COMPLETION DATE : 30-May-10
GROUND ELEVATION : m DRILLER : Mr. UDIN
COORDINATES : S. 8o 34' 48.45" , E. 116o 6' 6.08" X = 401.147.85 , Y = 9.051.439,65 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.80 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
0 10 20 30 40 50
20
40
60
80
0
30
30 13 13 14 20 47 37.00 2.64 PL= 30.26 G = 0.53 % = 22.61 O Cv=0.0051 ML
30.00 - 30.65 m LL= 45.19 S= 43.49 % Cc=0.2202 Lanau berpasir,
Lanau kelempungan/ kepasiran, plastisitas ML IP= 14.97 M= 54.91 % c = 0.223 eo=0.9880 plastisitas rendah
C= 1.07 % k= 8.72E-0.8
rendah, coklat muda, basah, kepadatan sangat kg/cm 2
HQ 89 mm
31 31 31
2 95 30.65 - 36.40 m SM
Pasir kelanauan, pasir halus , kepadatan lepas,
hitam abu, SM, basah, gradasi seragam, kelulusan
9-May-11
tinggi
HQ 89 mm
32 32 32
3 3 4 3 10 40.01 2.59 PL= 20.33 G = 1.17 % = 28.93 O Pengujian SM
LL= 15.99 S= 81.99 % konsoliasi Pasir Kelanauan
IP= -4.34 M= 16.53 % c = 0.143 tidak
NP C= 0.31 %
kg/cm 2 dilakukan
3 95 karena
material
berupa
pasir
33 33 33
HQ 89 mm
4 95
SINGLE BARREL - NQ - 73", widia bit
34 34 34
4 3 3 2 8
35 35 karena 35
material
berupa
pasir
2 95
10-May-11
36 36 36
5 3 3 3 9
HQ 89 mm
berupa
pasir
39 39 berkerikil , 39 PROYEK : INVESTIGASI GEOLOGI DAN
spt > 50, SOIL TEST BANGUNAN MASJID
HQ Æ 89 mm
40 40 40
17 25 27 - >50
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 30 50
0 32 10
0 34 8
0 36 9
0 38 50
0 40 50
0
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BORING NO : BH-1
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 30-Apr-10
LOCATION : MATARAM - NTB COMPLETION DATE : 30-May-10
GROUND ELEVATION : m DRILLER : Mr. UDIN
COORDINATES : S. 8o 34' 48.45" , E. 116o 6' 6.08" X = 401.147.85 , Y = 9.051.439,65 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.80 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
20
40
60
80
0 10 20 30 40 50
0
40 40
17 25 27 - >50
HQ Æ 89
mm
SW
3 90
14.13 2.57 NP G = 31.60 % = 35.63 O Pengujian SP
S= 60.15 % Passir Berkerikil , Gradsi
konsoliasi
M= 8.15 % c = 0.1345 Buruk
C= 0.10 % tidak
kg/cm 2
HQ 89 mm
dilakukan
41 41 karena 41
4 95 material
berupa
40.00 - 43.50 m pasir
10 12 - - > 50 berkerikil ,
11-May-11
Pasir Berkerikil, abu-abu hitam, masa dasar pasir spt > 50,
kasar, membulat - membulat Kepadatan sangat
5 95
padat, terdapat 5 - 8 % gravel, ukuran 0.5 - 3 cm,
42 agak bulat, tidak menyudut, keras, warna abu- abu, 42 42
kelulusan tinggi
6 95
HQ 89 mm
44 44 44
46 46 46
50 - - - > 50
12-May-11
4 95
47 47 47
LABORATORIUM GEOTEKNIK
DAN GEODESI
47.00 - 50.00 m JURUSAN TEKNIK SIPIL
5 95
KePasir kerikilan, abu-abu hitam, masa dasar pasir SM FAKULTAS TEKNIK
kasar, membulat - membulat Kepadatan sangat
UNIVERSITAS MATARAM
48 padat, terdapat 5 - 8 % gravel, ukuran 0.5 - 5 cm, 48 48
15 18 17 20 55
agak bulat, tidak menyudut, keras, warna , abu-
abu, batuan andesit,
BOR LOG PENGEBORAN INTI
6 90 21.12 2.53 NP G = 39.75 % = 38.97 O SM
Pengujian ISLAMIC CENTER
S= 46.74 % Pasir Kerikilan
konsoliasi
M= 13.32 % c = 0.0275
C= 0.19 % tidak
kg/cm 2 dilakukan
49 49 49 PROYEK : INVESTIGASI GEOLOGI DAN
karena
material
SOIL TEST BANGUNAN MASJID
berupa UTAMA DAN MINARET ISLAMIC
pasir CENTER
7 90 berkerikil ,
spt > 50, LOKASI : KOTA MATARAM - NTB
50 50 50
7 10 10 13 33
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 40 50
0 41.5 50
0 43.5 17
0 46 50
0 48 50
0 50 33
0
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BORING NO : BH-2
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 15-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : S. 8o 34' 49.19" , E. 116o 6' 3.05" X = 401.055.28 , Y = 9.051.428,97 LOGGED : Mr. MSH
DEPTH OF G.W.L : 4.00 m
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
cm
100
0 10 20 30 40 50
20
40
60
80
0
0 0
0.00 - 0.70 m
1 95 Lanau kepasiran, coklat muda, lembab,
ML
kelulusan tinggi, plastistas rendah, kepadatan
HQ 89 mm
0.70 - 2.00 m
1 2 95 Pasir kelanauan, pasir sedang, lepas, SM 1
1
coklat, lembab, SM,
terdapat <5 % gravel, bulat, agak menyudut,
berupa butiran batu apung, lunak , putih
kecoklatan, diameter 0.5 - 1 cm, kelulusan tinggi 3 2 10 13 25
HQ 89 mm
2 3 95 2
35.21 2.58 NP G = 17.73 % = 24.57 O SM
2
Pengujian
SM S= 67.26 % pasir Kerikilan
2.00 - 5.00 m M= 14.44 % c = 0.1265
konsoliasi
tidak
Pasir kelanauan, pasir kasar, lepas, C= 0.57 %
kg/cm
2
dilakukan
coklat, lembab, SM, karena
terdapat 5 - 8 % gravel, bulat, agak menyudut, material
berupa butiran batu apung, lunak , putih berupa
pasir
kecoklatan, diameter 0.5 - 2 cm, kelulusan tinggi
3 3 3
4 95
HQ 89 mm
15-May-11
4 5 95 4
32.54 2.57 NP G = 29.39 % = 25.87 O SW
4
Pengujian
S= 62.193 % Pasir Berkerikil, Gradasi
konsoliasi
M+C= 8.42% c = 0.011 Baik
tidak
kg/cm 2 dilakukan
1 2 2 1 5 karena
material
berupa
pasir
HQ 89 mm
5 6 90 5 5
2 1 3 4 8
6 6
18.04 2.59 NP G = 1.93 % = 28.38 O SP
6
Pengujian
S= 88.69 % Pasir, sedikit
konsoliasi
7 95 5.00 - 10.00 m M+C=9.39% c = 0.111 mengandung butiran
SP tidak
Pasir , pasir halus, lepas, hitam abu- abu kg/cm 2 halus
HQ 89 mm
dilakukan
kecoklatan, basah, SP, kelulusan tinggi karena
material
berupa
pasir
7 7 7
8 95 LABORATORIUM GEOTEKNIK
DAN GEODESI
1 3 3 2 8
JURUSAN TEKNIK SIPIL
9 95 FAKULTAS TEKNIK
UNIVERSITAS MATARAM
HQ 89 mm
8 8
20.78 2.6 NP G = 0.26 % = 21.95 O SP
8
Pengujian
S= 95.03 % Pasir, sedikit
konsoliasi
M+C= 4.71% c = 0.0195 mengandung butiran
tidak
kg/cm 2 dilakukan halus BOR LOG PENGEBORAN INTI
karena ISLAMIC CENTER
material
1 95
16-May-11
berupa
pasir
9 9 9 PROYEK : INVESTIGASI GEOLOGI DAN
SOIL TEST BANGUNAN MASJID
HQ Æ 89 mm
10 10 10
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 0 0
0 1.5 25
0 4.6 5
0 5.5 8
0 7.5 8
0 9.5 8
0 11.5 11
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
21.94882356 0
0.0195 0
BORING NO : BH-2
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 15-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : S. 8o 34' 49.19" , E. 116o 6' 3.05" X = 401.055.28 , Y = 9.051.428,97 LOGGED : Mr. MSH
DEPTH OF G.W.L : 4.00 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
0 10 20 30 40 50
20
40
60
80
0
10
10
HQ Æ 89
mm
SM
21.83 2.68 PL= 27.38 G = 1.02 % = 25.66 O Pengujian SM
LL= 33.14 S= 77.95 % konsoliasi Pasir Kelanauan
IP= 5.76 M= 20.35% c = 0.1247 tidak
3 90 C= 0.69 % kg/cm 2 dilakukan
karena
HQ 89 mm
11 11 material 11
berupa
pasir
5 4 3 4 11
10.00 - 12.80 m
Pasir kelanauan berkerikil, pasir kasar, lepas,
12 4 90 hitam abu, basah, SM, 12 12
26.06 2.63 NP G = 14.33 % = 31.66 O Pengujian SM
terdapat 5 - 7 % gravel, bulat, agak menyudut, SW S= 73.36 % konsoliasi Pasir Berkerikil
berupa butiran batu apung, lunak , putih M= 12.24 % c = 0.01 tidak
C= 0.07 % dilakukan
kecoklatan, diameter 0.5 - 1 cm, kelulusan tinggi kg/cm
2
HQ 89 mm
karena
material
berupa
pasir
berkeriki;
13 5 90 13 13
12.80 - 14.00 m SP
Pasir , pasir halus , basah, lepas, hitam abu, SP,
gradasi seragam
1 1 1 1 3
16-May-11
HQ 89 mm
SINGLE BARREL - NQ - 73", widia bit
14 6 95 14 14
20.79 2.6 PL= 27.69 G = 11.62 % = 26.57 O Pengujian SM
LL= 35.11 S= 65.15 % konsoliasi Pasir Berlanau
14.00 - 15.00 m SP IP= 7.43 M= 22.32 % c = 0.027 tidak
C= 0.91 % kg/cm 2 dilakukan
Pasir , pasir halus , basah, agak padat, hitam abu, karena
SP, gradasi seragam material
berupa
pasir
15 15 15
15.00 - 15.70 m
7 90 Pasir , pasir halus ,basah, lepas, SP
hitam abu, SP, gradasi seragam
HQ 89 mm
16 15,70 - 18.80 m CH 4 3 3 4 10
16 16
Lempung kelanauan, plastisitas tinggi,
hitam, kepadatan lembek, basah, CH
34.87 2.67 PL= 25.86 G = 0.12 % = 11.97 O Cv=0.0054 CH
8 93 LL= 56.91 S= 11.78 % Cc=0.2580 Lempung Plastisitas tinggi
IP= 31.04 M= 61.39 % c = 0.424 eo=1.9452
C= 26.81 % k= 1.50E-0.7
kg/cm 2
HQ 89 mm
17 17 17
LABORATORIUM GEOTEKNIK
9 95 DAN GEODESI
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
18
UNIVERSITAS MATARAM
18 18
2 3 3 5 11
kg/cm 2
2 90
20 20 20
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 9.5 0
0 11.5 11
0 13.5 3
0 16 10
0 18 11
0 19.5 9
0 21.5 27
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BORING NO : BH-2
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 15-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : S. 8o 34' 49.19" , E. 116o 6' 3.05" X = 401.055.28 , Y = 9.051.428,97 LOGGED : Mr. MSH
DEPTH OF G.W.L : 4.00 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
20
40
60
80
0 10 20 30 40 50
0
20
20 21.21 2.63 NP G = 0.16 % = 29.60 O Pengujian SM
S= 87.35 % Pasir kelanauan
HQ Æ 89 mm
pasir
21 3 95 21 21
HQ 89 mm
7 9 8 10 27
21.50 - 22.00 m
4 90 Lanau kepasiran, plastisitas rendah, coklat muda,
kepadatan padat, basah, ML, terdapat < 5 % %
22 gravel, hitam berbintik putih, kerikil batuan dan 22
24.81 2.56 PL= 32.33 G = 21.51 % = 24.01 O Cv=0.00727 SM
22
karang (karbonat) ukuran 0.5 - 4 cm, agak bulat, ML LL= 42.62 S= 44.89 % Cc=0.2655 Pasir kelanauan,
IP= 10.30 M= 32.80 % c = 0.1305 eo=1.10 berkerikil, plastisitas
tidak menyudut, keras, warna abu- abu C= 0.797 % 2 k= 1.2E-0.7
kg/cm rendah , plastisitas
rendah
SM
1 95 22.00 - 23.50 m
Pasir kelanauan, pasir halus , padat, hitam abu,
HQ 89 mm
23 23 23
SM, basah, gradasi seragam, kelulusan tinggi
18-May-11
2 1 1 1 3
2 90 23.50 - 28.50 m SP
Pasir , pasir halus ,basah, lepas,
SINGLE BARREL - NQ - 73", widia bit
karena
material
berupa
4 95 pasir
25 25 25
1 93
HQ 89 mm
26 26 26
2 2 2 2 6
30 30 30
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 19.5 9
0 21.5 27
0 23.5 3
0 26 6
0 28 41
0 30.6 42
0
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BORING NO : BH-1
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 15-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : S. 8o 34' 49.19" , E. 116o 6' 3.05" X = 401.055.28 , Y = 9.051.428,97 LOGGED : Mr. MSH
DEPTH OF G.W.L : 4.00 m
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
20
40
60
80
0 10 20 30 40 50
0
30 30
24.21 2.55 NP G = 0.52 % = 30.08 O Pengujian SM
S= 80.12 % konsoliasi Pasir kelanauan
1 95 SM M= 19.20% c = 0.12617 tidak
C= 0.16 % kg/cm 2 dilakukan
HQ 89 mm
karena
material
6 7 7 16 30 berupa
pasir
31 2 90 31 31
30.00 - 34.00 m
Pasir kelanauan, pasir halus , kepadatan lpadat,
coklat, SM, basah, kelulusan tinggi
SM
HQ 89 mm
32 3 95 32
23.18 2.53 NP G = 1.23 % = 34.59 O SM
32
Pengujian
S= 84.52 % konsoliasi Pasir berlanau
M= 13.95 % c = 0.0897
21-May-11
tidak
C= 0.30 kg/cm
2
dilakukan
karena
material
berupa
pasir
33 4 95 33 33
HQ 89 mm
3 2 2 3 7
SINGLE BARREL - NQ - 73", widia bit
34 34 34
34.00 - 36.80 m ML
5 95 Lanau kepasiran, plastisitas rendah, coklat muda, 40.31 2.68 PL= 36.84 G = 0.00 % = 17.21 O Cv=0.0060 ML
basah, kepadatan padat, ML, kelulusan rendah LL= 48.41 S= 29.82 % Cc=0.19287 Lanau Kepasiran
IP= 11.57 M= 65.83 % c = 0.3835 eo=1.33334
C= 4.35 % kg/cm
2 k= 1.23E-0.7
HQ 89 mm
35 35 35
1 90
36 36 36
8 7 9 9 25 40.86 2.67 PL= 39.65 G = 0.04 % = 23.79 O Cv=0.00184 ML
LL= 46.44 S= 40.09 % Cc=0.4680 Lanau Kepasiran
IP= 6.79 M= 59.24 % c = 0.394 eo=1.3249
C= 0.64 % kg/cm 2 k= 7.18E-0.8
HQ 89 mm
2 95
37 37 37
22-May-10
LABORATORIUM GEOTEKNIK
DAN GEODESI
36.80 - 40.00 m JURUSAN TEKNIK SIPIL
3 95
Pasir berkerikil/, basah, SW/SM, masa dasar pasir SW FAKULTAS TEKNIK
sangat kasar, membulat - membulat tanggung,
UNIVERSITAS MATARAM
HQ 89 mm
40 40 40
30 30 25 - >50
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 28 41
0 30.6 30
0 33.6 7
0 36 25
0 38 50
0 40 50
0
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BORING NO : BH-2
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 15-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : S. 8o 34' 49.19" , E. 116o 6' 3.05" X = 401.055.28 , Y = 9.051.428,97 LOGGED : Mr. MSH
DEPTH OF G.W.L : 4.00 m
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
20
40
60
80
0 10 20 30 40 50
0
40 40
30 30 25 - >50
HQ Æ 89
mm
1 90
40.00 - 50.00 m SM
HQ 89 mm
3 95
24-May-11
43 43
22.52 2.55 NP G = 34.01 % = 37.04 O SM
43
Pengujian
S= 51.67 % Pasir kerikilan berlanau
konsoliasi
M= 13.91 % c = 0.0535
C= 0.41 % 2
tidak
kg/cm dilakukan
4 95 karena
material
berupa
pasir
HQ 89 mm
SINGLE BARREL - NQ - 73", widia bit
44 44 berkerikil , 44
20 21 23 25 69 spt > 50,
5 90
45 45 45
6 90
46 46 46
45 - - - > 50 23.04 2.52 NP G = 48.99 % = 37.67 O Pengujian SP
S= 39.02 % Pasir berkerikil
konsoliasi
M= 11.67 % c = 0.0005
C= 0.33 % tidak
kg/cm 2 dilakukan
karena
1 90 material
berupa
pasir
47 47 berkerikil , 47
spt > 50,
LABORATORIUM GEOTEKNIK
DAN GEODESI
2 95 JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
25-May-11
48
UNIVERSITAS MATARAM
48 48
19 25 37 - > 50 23.8 2.52 NP G = 36.39 % = 36.68 O Pengujian SP
S= 52.62 % Pasir berkerikil
konsoliasi
M= 10.80 % c = 0.0075
C= 0.19 tidak
kg/cm 2 dilakukan BOR LOG PENGEBORAN INTI
3 95 karena ISLAMIC CENTER
material
berupa
pasir
49 49 berkerikil , 49 PROYEK : INVESTIGASI GEOLOGI DAN
spt > 50, SOIL TEST BANGUNAN MASJID
Pengujian
UTAMA DAN MINARET ISLAMIC
konsoliasi CENTER
4 95 tidak
c = 0.052 dilakukan
LOKASI : KOTA MATARAM - NTB
C= 0.17 %
kg/cm 2 karena
M= 8.07 %
S= 46.26 % = 42.39 O material Pasir berkerikil
50 24.16 2.57 NP G = 45.50 % Pasir SP 50
50
25 31 35 - > 50
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 40 50
0 42 50
0 44 50
0 46 50
0 48 50
0 50 50
0
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BORING NO : BH-3
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 1-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : S. 8o 34' 46.76" , E. 116o 6' 2.22" X = 401.029,67 , Y = 9.051.503,44 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.95 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)
1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
20
40
60
80
0 10 20 30 40 50
0
0 0
0.00 - 1.60 m
1 95 Lanau kepasiran, coklat muda, lembab,
ML
plastistas rendah, kepadatan lembek, ML, terdapat
HQ 89 mm
2 90
dilakukan
2 2 2
1 1 1 1 3 karena
1.60 - 3.60 m SM material
Pasir kelanauan, pasir sedang, lepas, coklat muda, berupa
lembab, SM, pasir
3 95 terdapat 5 - 7 % gravel, bulat, tidak menyudut,
berupa butiran batu apung, lunak , putih
kecoklatan, diameter 0.5 - 2 cm
3 3 3
1-May-11
HQ 89 mm
4 92
5 5 5
1 1 3 4 8
5.00 - 8.00 m SP
6 90
Pasir , pasir halus - sedang, lepas, hitam abu,
basah, SP, terdapat 5 - 7 % gravel, bulat, tidak
menyudut,
6
berupa butiran batu apung, lunak , putih 6 6
kecoklatan, diameter 0.5 - 2 cm 19.49 2.54 NP G = 2.77 % = 31.61 O Pengujian SP
S= 89.05 % Pasir, sedikit butiran
konsoliasi
M+C=8.18 % c = 0.0195 halus
tidak
kg/cm 2
HQ 89 mm
dilakukan
7 95 karena
material
berupa
pasir
7 7 7
3 2 3 4 9
LABORATORIUM GEOTEKNIK
DAN GEODESI
JURUSAN TEKNIK SIPIL
1 90 MH FAKULTAS TEKNIK
UNIVERSITAS MATARAM
HQ 89 mm
8 8
21.23 2.60 NP G = 1.75 % = 32.10 O SW
8
Pengujian
8.00 - 9.40 m S= 88.55 %
konsoliasi Pasir, Gradasi Baik
SP M+C=9.70 % c = 0.018
Pasir , pasir halus , lepas, basah,
2-May-11
2
tidak
kg/cm
, abu abu , SP, gradasi seragam,Kelulusan Tinggi dilakukan BOR LOG PENGEBORAN INTI
2 90 karena ISLAMIC CENTER
material
berupa
pasir
9 9 PROYEK : INVESTIGASI GEOLOGI DAN
9.40 - 10.00 m 1 1 1 1 3
9
SOIL TEST BANGUNAN MASJID
Pasir kelanauan, pasir halus -sedang, lepas,
HQ Æ 89 mm
10 10 10
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 0 0
0 2 3
0 4 5
0 5 8
0 7 9
0 9 3
0 12 5
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BORING NO : BH-3
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 1-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : S. 8o 34' 46.76" , E. 116o 6' 2.22" X = 401.029,67 , Y = 9.051.503,44 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.95 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
0 10 20 30 40 50
20
40
60
80
0
10
10
10.00 - 10.70 m
HQ Æ 89
mm
dilakukan
11 11 11
karena
10.70 - 12.00 m material
berupa
Pasir , pasir sedang, lepas, abu kecoklatan, SP pasir
5 95 basah, SP, terdapat < 5% gravel, bulat, tidak
menyudut,
berupa butiran batu apung, lunak , putih
kecoklatan, diameter 0.5 - 1 cm, kelulusan tinggi
12 12 12
1 1 2 2 5
12.00 - 18.00 m
3-May-11
6 95 SP
gradasi seragam 22.64 2.53 NP G = 0.50 % = 25.05 O Pengujian SP
S= 89.60 % Pasir, sedikit butiran
konsoliasi
M= 9.84 % c = 0.0055 halus
C= 0.06 % 2
tidak
kg/cm dilakukan
13 13 13
karena
material
berupa
pasir
7 95
HQ 89 mm
SINGLE BARREL - NQ - 73", widia bit
14 14 14
23.15 2.55 NP G = 0.15 % = 29.08 O Pengujian SP
S= 95.35 % Pasir, sedikit butiran
konsoliasi
M+C=4.50% c = 0.008 halus
tidak
kg/cm 2 dilakukan
1 1 1 1 1 karena
material
8 90 berupa
pasir
15 15 15
HQ 89 mm
1 95
16 16 16
23.34 2.55 NP G = 0.01 % = 26.63 O Pengujian SP
S= 89.85 % Pasir, sedikit butiran
konsoliasi
M+C=10.14% c = 0.005 halus
tidak
kg/cm 2 dilakukan
2 95 karena
material
berupa
pasir
HQ 89 mm
17 17 17
1 1 1 2 4
LABORATORIUM GEOTEKNIK
4-May-11
3 95 DAN GEODESI
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
18
UNIVERSITAS MATARAM
18 18
1 1 2 2 5 20.55 2.58 PL= 25.24 G = 0.01 % = 23.82 O Cv=0.00188 SM
18.00 - 19.20 m LL= 33.24 S= 78.33 % Cc=0.3878 Pasir kelanauan
Pasir kelanauan, pasir halus -, lepas, abu ML IP= 7.71 M= 21.51% c = 0.032 eo=1.0659
C= 0.15 % kg/cm 2 k= 1.32E-0.7
kecoklatan, basah, SM, kelulusan tinggi BOR LOG PENGEBORAN INTI
HQ 89 mm
ISLAMIC CENTER
4 95 19.20 - 19.50 m
Lanau kelempungan, plastisitas tinggi, MH
19 19 19 PROYEK : INVESTIGASI GEOLOGI DAN
coklat hitam abu, kepadatan lembek, basah, MH,
SOIL TEST BANGUNAN MASJID
kelulusan rendah UTAMA DAN MINARET ISLAMIC
CENTER
5 95
basah, SM, kelulusan tinggi
20 20 20
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
0
0 Nilai spt
0 kedalaman Nilai N
0 9 3
0 12 5
0 14.5 1
0 17 4
0 18 5
0 19.5 3
0 22 5
0
0
0
0
0
0
0
0
0 tajuk BH1 BH3 15 10 10 10
0 2 71 2 15 - - -
0 5 9 5 366 8 12 19 20
0 7 13 7 350 12 16 17 ?
0 10 91 10 40 16 15 12 12
0 30
0 430
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BORING NO : BH-3
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 1-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : S. 8o 34' 46.76" , E. 116o 6' 2.22" X = 401.029,67 , Y = 9.051.503,44 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.95 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
20
40
60
80
0 10 20 30 40 50
0
20 20
21.59 2.55 PL= 26.24 G = 0.08 % = 21.33 O Cv=0.0027 SM
LL= 27.83 S= 73.41 % Cc=0.3443 Pasir kelanauan
HQ Æ 89 mm
21 21 21
HQ 89 mm
2 95 21.00 - 24.00 m SP
Pasir , pasir halus , lepas, basah, hitam abu, SP,
gradasi seragam, kelulusan tinggi 23.72 2.60 NP G = 0.00 % = 24.46 O SP
5-May-11
Pengujian
S= 92.81 % Pasir , Sedikit butiran
konsoliasi
M= 7.13 % c = 0.034 halus
22 22 tidak 22
1 1 2 2 5 C= 0.06 %
kg/cm 2 dilakukan
karena
material
3 95 berupa
pasir
HQ 89 mm
23 23 23
4 95
SINGLE BARREL - NQ - 73", widia bit
24 24 24
10 4 4 16 24 31.77 2.63 PL= 26.61 G = 1.88 % = 13.75 O Cv=0.00413 ML
24.00 - 24.80 m LL= 37.18 S= 47.18 % Cc=0.1965 Lanau berpasir,
IP= 10.57 M= 49.37 % c = 0.1185 eo=0.96156 plastisitas rendah
Lanau kelempungan, plastisitas rendah, coklat tua, C= 1.57 % k= 1.05E-0.7
kg/cm 2
HQ 89 mm
24.80 - 25.00 m
25 Lanau kepasiran, cooklat tua hitam, lbasah, 25 25
plastistas rendah, kepadatan lagak padat, ML,
25.00 - 26.40 m
2 95 Lanau kepasiran, cooklat tua hitam, lbasah, ML
plastistas rendah, kepadatan padat, ML,
HQ 89 mm
26 26 26
17 21 23 26 70
dilakukan
karena
27 27 27
27.00 - 27.45 m material
Lanau kepasiran, cooklat muda, lbasah, ML berupa
plastistas rendah, kepadatan padat, ML, pasir LABORATORIUM GEOTEKNIK
DAN GEODESI
HQ 89 mm
4 95
27.45 - 28.65 m JURUSAN TEKNIK SIPIL
Pasir kelanauan, pasir halus , agak padat, abu SM 23.40 2.6 PL= 25.90 G = 0.42 % = 29.11 O Pengujian SM FAKULTAS TEKNIK
LL= 31.16 S= 73.84 % Pasir kelanauan
hitam, SM, basah, IP= 5.26 M= 25.42 % c = 0.0675
konsoliasi UNIVERSITAS MATARAM
28 28 tidak 28
5 5 5 7 17 C= 0.32 %
kg/cm 2 dilakukan
karena
material
berupa BOR LOG PENGEBORAN INTI
5 95
pasir ISLAMIC CENTER
28.65 - 30.00 m
HQ 89 mm
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
20
40
60
80
0 10 20 30 40 50
0
30 30
5 7 6 7 20
30.00 - 31.00 m
Lanau kelempungan/ kepasiran, plastisitas ML
rendah, coklat muda, basah, kepadatan agak
HQ 89 mm
1 93
padat, ML
31 31 31
2 93 31.00 - 36.00 m SM
Pasir kelanauan, pasir halus , kepadatan agak ,
padat, hitam abu- abu 21.92 2.56 NP G = 1.13 = 27.29
O SM
8-May-11
Pengujian
S= 79.62 % Pasir Kelanauan
konsoliasi
HQ 89 mm
M= 19.09 % c = 0.014
32 32 tidak 32
3 2 4 5 11 C= 0.16 % kg/cm 2 dilakukan
karena
material
3 95 berupa
pasir
33 33 33
HQ 89 mm
4 95
SINGLE BARREL - NQ - 73", widia bit
34 34
24.21 2.55 PL= 26.76 G = 13.84 % = 33.18 O SM
34
Pengujian
LL= 35.45 S= 47.03 % Pasir Kelanauan
konsoliasi
1 95 IP= 8.69 M= 38.59 % c = 0.02
C= 0.55 % 2
tidak
kg/cm dilakukan
karena
32 43 - - >50 material
2 96 berupa
pasir
HQ 89 mm
35 35 35
3 95
9-May-11
material
4 95 terdapat < 5% gravel, ukuran 0.5 - 2 cm, agak berupa
bulat, tidak menyudut, keras, warna abu- abu pasir
37 37 37
5 95
37.00 - 40.00 m
HQ 89 mm
38 38 38
Pasir kelanauan berkerikil, basah, SM, SM 25 25 20 29 74
Pasir kasar, abu- abu kecoklatan , Kepadatan
sangat padat, 19.87 2.54 NP G = 53.66 % = 38.35 O GP
Pengujian
1 95 terdapat 5 - 8 % gravel, ukuran 0.5 - 6 cm, agak S= 40.37 %
konsoliasi Kerikil Gradasi buruk,
M+C=5.97 % c = 0.0015
bulat, agak menyudut, keras, warna abu- abu tidak campuran pasir kerikil
kg/cm 2 dilakukan
10-May-11
karena
39 material
39 39
berupa
HQ Æ 89 mm
kerikil
berpasir,
spt > 50,
2 95
40 40 40
15 18 20 21 59
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 40 - 50)
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
CORES Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
DEPTH IN METER
DEPTH OF WATER
CORE BARREL &
JOINT INTERVAL
GRAPH
CLASSIFICATION
RECOVERY in %
S.P.T BLOW / 30
ROCK SYMBOL
CASSING TYPE
GWL IN METER
Klasifikasi tanah
Analisa Butiran
OF DESCRIPTION
METHOD OF
15 cm pertama
10 cm pertama
R.Q.D
HARDNESS
Sudut Geser
ROCK UNIT
OF
10 cm kedua
k in cm/sec
10 cm ketiga
SAMPLING
Konsolidasi
R.Q.D in %
Berat Jenis
BIT TYPE
GRAFIK NILAI N
LITHOLOGY
LUGEON
RUN NO.
Kadar Air
SCALE
LL -PL
DATE
LOSS
ROCK
(cm)
100
cm
20
40
60
80
0 10 20 30 40 50
0
40 40
15 18 20 21 59
HQ Æ 89
mm
40.00 - 44.50 m SM
3 90 20.49 2.57 NP G = 56.09 % = 38.73 O Pengujian GP
Pasir kelanauan berkerikil , basah, SM, S= 40.28 % Kerikil Gradasi buruk,
konsoliasi
Pasir kasar, abu- abu kecoklatan , Kepadatan M+C=3.63% c = 0.0055 campuran pasir kerikil
tidak
sangat padat, kg/cm 2 dilakukan
terdapat 5 - 8 % gravel, ukuran 0.5 - 6 cm, agak karena
HQ 89 mm
material
41 bulat, agak menyudut, keras, warna abu- abu 41
berupa
41
4 95
kerikil
berpasir,
spt > 50,
10-May-11
5 95
42 42 42
27 20 25 28 73
6 95
21.00 2.57 NP G = 15.93 % = 34.96 O Pengujian SM
HQ 89 mm
1 95
HQ 89 mm
SINGLE BARREL - NQ - 73", widia bit
44 44 44
25 25 30 - > 50
3 95
45.30 - 47.55 m
SM
Pasir kelanauan berkerikil, basah, SM,
Pasir kasar, coklat tua, Kepadatan padat,
46 terdapat < 5 % gravel, ukuran 0.5 - 3 cm, agak 46 46
5 5 4 6 15 22.61 2.56 PL= 24.85 G = 18.0 % = 34.79 O Pengujian SM
bulat, agak menyudut, keras, warna , abu- abu, LL= 26.77 S= 61.00 % Pasir kelanauan
konsoliasi
batuan andesit, IP= 1.92 M= 18.05 % c = 0.0975
tidak
C= 2.95 %
kg/cm 2 dilakukan
13-May-11
karena
4 95 material
berupa
pasir
47 47 47
5 95
48 47.55 - 49.10 m 48
26.38 2.60 PL= 25.00 G = 2.41 % = 22.70 O Cv=0.0055 ML
48
Lanau kepasiran, plastisitas rendah, coklat muda, ML LL= 26.69 S= 45.12 % Cc=0.2389 Lanau berpasir,
6 95 basah, kepadatan agak padat, ML IP= 1.69 M= 50.45 % c = 0.1615 eo=0.8918 plastisitas rendah
C= 2.02 % 2 k= 2.77E-0.7
kg/cm
4 3 5 6 14
7 95
49 49 49
49.10 - 50.00 m
Pasir kelanauan berkerikil , basah, SM, SM
8 95 Pasir kasar, hitam abu- abu, Kepadatan sangat
padat,terdapat 5 - 8 % gravel, ukuran 0.5 - 3 cm,
agak bulat, agak menyudut, keras, warna , abu-
abu, batuan andesit, 50
50 50
5 10 17 16 43
LEGEND : CORING SPT SAMPLING UDS MAT Tlmv Satuan Batuan Gunung api Tua LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011