STANDAR PEKERJAAN STRUKTUR BETON

I.1 KETENTUAN UMUM I.2 TEBAL SELIMUT BETON UNTUK PENULANGAN I.3. PENYAMBUNGAN LEWATAN DAN PANJANG
PENJANGKARAN

SEMUA PEKERJAAN BETON BERTULANG DAN BETON


KOMPONEN TEBAL MINIMUM PANJANG
PRATEGANG, MENGIKUTI PERSYARATAN DIBAWAH INI : KONDISI MUTU BAJA PANJANG LEWATAN
SELIMUT BETON PEJANGKARAN KETERANGAN
STRUKTUR ( L1 )
( L2 )
( mm )
DIBAWAH INI :
TIDAK LANGSUNG BERHUBUNGAN DENGAN
20 ATAU U - 24 35 d 35 d
PENGAIT
- PERATURAN BETON INDONESIA (PBI 1971) DENGAN CUACA (d)*)
PELAT DAN
DINDING BETON U > 40 45 d 40 d TANPA PENGAIT
- STANDAR NASIONAL INDONESIA (SNI-2002)
LANGSUNG BERHUBUNGAN 40
DENGAN CUACA
- PERATURAN UMUM BAHAN BANGUNAN INDONESIA SEMUA MUTU 50 d - UNTUK SPIRAL

(PUBBI 1983) TIDAK LANGSUNG BERHUBUNGAN 30 ATAU


DENGAN CUACA ( d ) **) CATATAN:
BALOK DAN
- STANDAR INDUSTRI INDONESIA (SII) 1. SAMBUNGAN TIDAK BOLEH DITEMPATKAN PADA DAERAH
KOLOM
LANGSUNG BERHUBUNGAN DENGAN TEGANGAN YANG MAKSIMUM
- AMERICAN CONCRETE INSTITUTE (ACI 318 M-99) 40
DENGAN CUACA 2. SAMBUNGAN UNTUK TULANGAN ATAS BALOK DAN
PLAT DAPAT DAPAT DITEMPATKAN DITENGAH BENTANG
- AMERICAN SOCIETY FOR TESTING AND MATERIALS BETON YANG DICOR LANGSUNG
3. SAMBUNGAN UNTUK TULANGAN BAWAH DAPAT
DIATAS LANTAI KERJA SEBELUM 50
(ASTM) BETON YANG DAPAT DITEMPATKAN PADA DAERAH AKHIR/UJUNG
BERHUBUNGAN DENGAN TANAH
BEHUBUNGAN 4. SAMBUNGAN TIDAK DAPAT DITEMPATKAN PADA DAERAH DIMANA
DENGAN TANAH BETON YANG DICOR LANGSUNG BALOK INDUK DAN BALOK ANAK YANG MENUMPU PADANYA
DIATAS TANAH DAN SELALU 70
BERHUBUNGAN DENGAN TANAH 5. UNTUK TULANGAN D>32mm,DIMANA DITUJUKAN DALAM GAMBAR
DAPAT DIGUNAKAN SAMBUNGAN MEKANIS (MEKANICAL JOINT)

*) 20 mm ATAU LEBIH BESAR DARI PADA TULANGAN UTAMA

**) 30 mm ATAU LEBIH BESAR DARI PADA TULANGAN UTAMA

I.4. DUDUKAN UNTUK TULANGAN I.5. PENEMPATAN / LETAK SAMBUNGAN I.6. SUSUNAN BENGKOKAN PADA AKHIRAN
TULANGAN

d1

d2
SUDUT MUTU MINIMUM MINIMUM
ILUSTRASI CATATAN
BENGKOK BAJA BENGKOKAN EL
D
DUDUKAN TULANGAN L1*) L1*)
D U - 24 3d
4d
0.5 L1 180 U > 40 5d OR 65 mm
TULANGAN YANG
DIAMETER DUDUKAN JARAK DUDUKAN EL
AKAN DISOKONG
( mm )
L1

< 600 D U - 24 3d d=8 ~ 12


UNTUK
700 135 U > 40 5d 6d SENGKANG
DAN DENGAN PAKET : JGCC-08
EL
800 PENGIKAT
PEMBANGUNAN JEMBATAN
800 D U - 24 3d PENYEBERANGAN ORANG (5 UNIT)
0.5 L1 L1
D13 ANTARA CIGOMBONG - CICURUG
D13 1000 90 U > 40 5d 8d

EL
LINTAS BOGOR - SUKABUMI
D13 1250 *) d1= d2,MINIMUM L1 DAPAT DIAMBIL DENGAN d YANG TERKECIL TAHUN ANGGARAN 2019
D16
D16 1500

D16 1500
D19
D19 1750

D19 1750
D22 PT. SAPUTRA MAHA GRAHA
D22 2000

D25 D25 2000

D32 D32 2000

Jl. Moch Toha Gg.Merdeka No.270


Siliwangi, Cirebon, Jawa Barat
STANDAR PEKERJAAN BAJA
1. KETENTUAN UMUM 2) BAUT MUTU TINGGI 3.2 LEKUKAN LAS PREQUALIFIED WELDED JOINTS
BAUT
Complete-penetration groove welds
1.1 SEMUA PEKERJAN BAJA PROFIL MENGIKUTI CLOSED RING MUTU TINGGI
Single V-groove weld (2) Tolerances
KETENTUAN TANDA Built joint (B)
PERSYARATAN PERATURAN DIBAWAH INI : As detailed As fit up
Dh R

- PERATURAN JEMBATAN JALAN REL INDONESIA R = + 1/16, -0 + 1/4, -1/16

Lihat Tabel 1
o o o o
= + 10 , -0 + 10 , -5
(PJJRI 1988) SPIRAL RING MUTU TINGGI
MUR T1

- PERATURAN UMUM BAHAN BANGUNAN INDONESIA 2 mm Base


Metal Thickness Groove Preparation Gas
Dh : DIAMETER LUBANG BAUT 30 mm PELAT PEMBANTU Permitted Shielding
(PUBBI 1983) (SETEMPAT) 4.5 mm Welding Joint
(U = unlimited)
Root Groove Welding for
< d + 2 mm Process Designation T1 T2 Opening Angle Positions (FCAW) Notes
- STANDAR INDUSTRI INDONESIA (SII) d : DIAMETER BAUT o
R = 1/4 = 45 All Br,N
SMAW B-U4a U
- AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) TABEL 1 o
All Br,N
R = 3/8 = 30

- AMERICAN WELDING SOCIETY (AWS) R = 3/16 = 30


o
All Required A,Br,N
A325 AND A490 HIGH-STRENGTH BOLTS GMAW
B-U4a-GF U o
All A,Br,N
R = 1/4 = 45 Not req.
- AMERICAN SOCIETY FOR TESTING AND MATERIAL (ASTM) ENTERING AND TIGHTENING CLEARANCES
FCAW
o
R = 3/8 = 30 F Not req. A,Br,N
- JAPANESE RAILWAY STANDARD (JRS) Bolt Bolt C3

30 mm
2 mm
H1 H2 C1 C2
Dia. Socket Round Clipped
- JAPAN INDUSTRIAL STANDARD (JIS) 5/8 1 3/4 25/64 1 1/4 1 11/16 11/15 9/16
PELAT PEMBANTU
(SETEMPAT) 4.5 mm
socket
3/4 2 1/4 15/32 1 3/8 1 1/4 3/4 3/4 11/16
1.2 BAHAN 7/8 2 1/2 36/64 1 1/2 1 3/8 7/8 7/8 13/16
H1 H2
1) PELAT BAJA CETAK DAN : TCPBB St 39 C1 C3
1 2 5/8 39/64 1 5/8 1 7/16 15/16 1 7/8
3.3 LAS GROOVE
1 1/8 2 7/8 11/16 1 7/8 1 9/16 1 1/16 1 1/8 1

PROFIL BAJA CETAK : ASTM A36/A36 M, 1 1/4

1 3/8
3 1/8

3 1/4
25/32

27/32
2

2 1/8
1 11/16 1 1/8

1 3/4 1 1/4
1 1/4

1 3/8
1 1/8

1 1/4
4. BAUT ANGKUR
A570/A570M PREQUALIFIED WELDED JOINTS
C2

C2

H2
1 1/2 3 1/2 15/16 2 1/4 1 7/8 1 5/16 1 1/2 1 5/16
Complete-penetration groove welds
2) PELAT SIMPUL : TCPBB St 37 Single V-groove weld (2) Tolerances
C3 fillet H1 = height of head
Built joint (B)
: ASTM A 611 H2 = shank extension, max., based on one flat w asher

>10mm
MUR KE 2
C1 = clearance for tightening As detailed As fit up
MUR PERTAMA
C2 = clearance for entering RING BAUT
R = + 1/16, -0 + 1/4, -1/16 PELAT LANDAS
3) PIPA BAJA : TCPBB St 37 C3 = clearance for fillet, based on std, hardened washer T1
o o o o
= + 10 , -0 + 10 , -5
: ASTM A500,A501 ELEVASI DUDUKAN
R

30
BETON BERTULANG
: JIS G3444 STK400 Base
Metal Thickness Groove Preparation Gas

4) PIPA BAJA PERSEGI : TCPBB St 37 3. LAS Welding


Process
Joint
Designation
(U = unlimited)
T1 T2
Root
Opening
Groove
Angle
Permitted
Welding
Positions
Shielding
for
(FCAW) Notes
: ASTM A500,A501 R = 1/4 = 45
o
All N
BAUT ANGKUR

: JIS G3466 STKR400 LAS FILLET SMAW B-U2a U R = 3/8 = 30


o
F, V, OH N

L
o

3.1 LAS TEPI KETENTUAN TANDA R = 1/2 = 20 F, V, OH N

5) MUR DAN BAUT BIASA : TCPBB St 37 R = 3/16 = 30


o
F, V, OH Required A,N d
GMAW o
: ASTM A307,A563 t FCAW
B-U2a-GF U R = 3/8 = 30 F, V, OH Not req. A,N
PAKET : JGCC-08
o
: JIS B1180 , B1181 R = 1/4 = 45 F, V, OH Not req. A,N PEMBANGUNAN JEMBATAN

D
o
B1251 , B1256 SAW B-L2a-S 2 max R = 1/4 = 30 F N PENYEBERANGAN ORANG (5 UNIT)
o
SAW B-U2-S U R = 5/8 = 20 F N ANTARA CIGOMBONG - CICURUG
S

6) BAUT MUTU TINGGI : ASTM A490, < 100 LINTAS BOGOR - SUKABUMI
S
: JIS B1186 F10T A TAHUN ANGGARAN 2019
PREQUALIFIED WELDED JOINTS
7) ANGKUR BAUT : TCPBB St 37 Complete-penetration groove welds
d : DIAMETER BAUT ANGKUR ( mm )
: ASTM A36/A36M Single V-groove weld (2)
Built joint (B)
Tolerances Dh : DIMETER LUBANG BAUT ANGKUR < d+2mm
: JIS G3101 SS400 Back gouge
As detailed As fit up
D : PANJANG BENGKOKAN > 3d ( mm )
+ 1/4, -0
L : PANJANG BAUT ANGKUR >35d ( mm )
S

+ 1/16, -0
T1
o o o o PT. SAPUTRA MAHA GRAHA
2. SAMBUNGAN BAUT f = + 10 , -0 + 10 , -5
S
t

R SAW + 1/16, -0
S Spacer
SMAW + 1/8, -0

2.1 DETAIL BAUT


Base
Metal Thickness Groove Preparation Gas
1) BAUT BIASA (U = unlimited) Permitted Shielding
t Welding Joint Root Root Groove Welding for
BOLT Process Designation T1 T2 Opening Face Angle Positions (FCAW) Notes
o
RING BAUT R = 1/4 f = 0 to 1/8 = 45 All
Dh : DIMAETER LUBANG BAUT SMAW B-U3a U
R = 3/8 f = 0 to 1/8 = 30
o
F,OH,V
C,M,
Spacer = N
< d + 0.2 mm 1/8 x R
S

o
R = 1/2 f = 0 to 1/8 = 20 F,OH,V Jl. Moch Toha Gg.Merdeka No.270
S
Dh Siliwangi, Cirebon, Jawa Barat
S
RING BAUT
d : DIAMETER BAUT U o C,M,
> 5 mm

SAW B-U3a-S Spacer = R = 5/8 f = 0 to 1/4 = 20 F


N
1/4 x R
LANDASAN (TIPE BIASA)
MUR
533

530

525

520

515

Bidang persamaan 510.00

ELEVASI EXISTING

JARAK (m)

ELEVASI DESAIN

JARAK (m)
PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019
a2 a2
- -

a1 a1
-
-

DENAH PILECAP A1 - DENAH ABUTMENT A1 - POTONGAN a1 POTONGAN a2


- - - -
SKALA 1 : 75 SKALA 1 : 75 SKALA 1 : 75 SKALA 1 : 75
PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019
c1
-

DENAH PILECAP P1 - c2 c3
- - -
SKALA 1 : 75

c2
-

d4
-

c1
-

DENAH PILAR P1 - PAKET : JGCC-08


PEMBANGUNAN JEMBATAN
-
SKALA 1 : 75 PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN c1 POTONGAN c2 POTONGAN c3


- - -
SKALA 1 : 75 SKALA 1 : 75 SKALA 1 : 75

POTONGAN d4
-
SKALA 1 : 75
d3 d2
- -

d1
-

d4
-

DENAH PILECAP P2 -
-
SKALA 1 : 75

d1
-

DENAH PILAR P2 - PAKET : JGCC-08


- PEMBANGUNAN JEMBATAN
SKALA 1 : 75
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN d1 POTONGAN d2 POTONGAN d3


- - -
SKALA 1 : 75 SKALA 1 : 75 SKALA 1 : 75

POTONGAN d4
-
SKALA 1 : 75
e2
-

e1
-

DENAH PILECAP P3 -
-
SKALA 1 : 75

e2
-

e1
-

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN e1 POTONGAN e2
- -
SKALA 1 : 75 SKALA 1 : 75

DENAH PILAR P3 -
-
SKALA 1 : 75
f2 f2
- -

f1 f1
-
-

DENAH PILECAP A2 - DENAH ABUTMENT A2 - POTONGAN f1 POTONGAN f2


- - - -
SKALA 1 : 75 SKALA 1 : 75 SKALA 1 : 75 SKALA 1 : 75

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019
g2 g3 g2 g2
-

g1
-

DENAH DECK -
-
SKALA 1 : 170

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN g1
-
SKALA 1 : 170
POTONGAN g2
-
SKALA 1 : 25

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN g3
-
SKALA 1 : 25
PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019
h1 PAKET : JGCC-08
- PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

P2
P3

DETAIL BEARING PAD - POTONGAN h1


- -
SKALA 1 : 10 SKALA 1 : 10
1
-

2
-

POTONGAN 1 POTONGAN 2
- -
SKALA 1 : 20 SKALA 1 : 20

3
-

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN 3 POTONGAN 4
- -
SKALA 1 : 20 SKALA 1 : 20
4
-

-
-
SKALA 1 : 100
1
-

2
-

POTONGAN 1 POTONGAN 2
- -
SKALA 1 : 20 SKALA 1 : 20

3
-

POTONGAN 5
-
SKALA 1 : 20

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN 3 POTONGAN 4
- -
4 SKALA 1 : 20 SKALA 1 : 20
-

5
-

-
-
SKALA 1 : 100
a2
-

a1
-

POTONGAN a1 POTONGAN a2
- -
SKALA 1 : 75 SKALA 1 : 75
TULANGAN PILECAP A1 -
-
SKALA 1 : 75

a4
-

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
a3 PENYEBERANGAN ORANG (5 UNIT)
-
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN a3 POTONGAN a4
- -
SKALA 1 : 75 SKALA 1 : 75

TULANGAN ABUTMENT A1 -
-
SKALA 1 : 75
b2
-

b1
-

TULANGAN PILECAP P1 - POTONGAN b1 POTONGAN b2


- - -
SKALA 1 : 75 SKALA 1 : 75 SKALA 1 : 75

b1
-

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN b2
-
SKALA 1 : 75
b2
-

TULANGAN PILAR P1 - POTONGAN b1


- -
SKALA 1 : 75 SKALA 1 : 75
b2
-

b1
-

TULANGAN PILECAP P2 - POTONGAN b1 POTONGAN b2


- - -
SKALA 1 : 75 SKALA 1 : 75 SKALA 1 : 75

b1
-

b2
-

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN b2
-
SKALA 1 : 75

TULANGAN PILAR P2 - POTONGAN b1


- -
SKALA 1 : 75 SKALA 1 : 75
b2
-

b1
-

TULANGAN PILECAP P3 - POTONGAN b1 POTONGAN b2


- - -
SKALA 1 : 75 SKALA 1 : 75 SKALA 1 : 75

b1
-

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
b2 TAHUN ANGGARAN 2019
-

POTONGAN b2
-
SKALA 1 : 75

TULANGAN PILAR P3 - POTONGAN b1


-
- SKALA 1 : 75
SKALA 1 : 75
a2
-

a1
-

POTONGAN a1 POTONGAN a2
- -
SKALA 1 : 75 SKALA 1 : 75
TULANGAN PILECAP A2 -
-
SKALA 1 : 75

a4
-

PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
a3 LINTAS BOGOR - SUKABUMI
- TAHUN ANGGARAN 2019

POTONGAN a3 POTONGAN a4
- -
SKALA 1 : 75 SKALA 1 : 75

TULANGAN ABUTMENT A2 -
-
SKALA 1 : 75
a1 a2 a1 b a1 a2 a1 a1 a2 a1
- - - - - - - -

PAKET : JGCC-08
DENAH DECK - PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
-
SKALA 1 : 170
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019
POTONGAN a1
-
SKALA 1 : 25

POTONGAN a2
-
SKALA 1 : 25 PAKET : JGCC-08
PEMBANGUNAN JEMBATAN
PENYEBERANGAN ORANG (5 UNIT)
ANTARA CIGOMBONG - CICURUG
LINTAS BOGOR - SUKABUMI
TAHUN ANGGARAN 2019

POTONGAN b
-
SKALA 1 : 25