1. BIAYA FISIK
750,000,000.00 + (84,325,000.00) x
27,794,250.00
750,000,000.00 + (3.03) x
750,000,000.00 + (75,847,522.42)
674,152,477.58
2. BIAYA PERENCANAAN
46,500,000.00 + (84,325,000.00) x
27,794,250.00
46,500,000.00 + (3.03) x
46,500,000.00 + (3,362,320.67)
43,137,679.33
3. BIAYA PENGAWASAN
31,950,000.00 + (84,325,000.00) x
27,794,250.00
31,950,000.00 + (3.03) x
31,950,000.00 + (2,384,646.10)
29,565,353.90
4. BIAYA PENGELOLAAN
61,875,000.00 + (84,325,000.00) x
27,794,250.00
61,875,000.00 + (3.03) x
61,875,000.00 + (2,730,510.81)
59,144,489.19
REKAPITULASI
1. BIAYA FISIK 733,296,966.77
2. BIAYA PERENCANAAN 43,137,679.33
3. BIAYA PENGAWASAN 29,565,353.90
JUMLAH 806,000,000.00
ATAN
AN SDM APARATUR NEGARA
KERJAAN UMUM
BER 2007
HALAMAN 100)
806,000,000.00
fisik perencanaan pengawasan pengelolaan
25,000,000.00
25,000,000.00
1,108,250.00
1,108,250.00
32,736,000.00 - 31,950,000.00 )
3,513,890,000
786,000.00 108,780,000
65,860,000
11,470,000
786,000.00 3,700,000,000
62,775,000.00 - 61,875,000.00 )
900,000.00
900,000.00
jml seluruh
jml seluruh
890,325,000.00 890,325,000.00 -
918,119,250.00 918,119,250.00 -
364,770,250.00
jml seluruh
890,325,000.00 890,325,000.00 -
918,119,250.00 918,119,250.00 -