Anda di halaman 1dari 9

DAFTAR HARGA SATUAN BAHAN DAN UPAH

UNIVERSITAS NEGERI SEMARANG

PEKERJAAN =

LOKASI =
TAHUN ANGGARAN = 2019

DAFTAR HARGA BAHAN

NO. JENIS PEKERJAAN SATUAN HARGA (Rp.)

1 Cat Kayu ( Emco ) Ltr 65,000.00


2 Dempul Ltr 16,500.00
3 Ampelas Lbr 3,100.00
4 Paku Kg 15,500.00
5 Kawat Beton Kg 18,000.00
6 Besi Profil Kg 14,150.00
7 Kawat Las kg 60,000.00
8 Solar ltr 7,200.00
9 Minyak bekisting ltr 15,000.00
10 Galvalum m2 81,000.00
11 Minyak Pelumas ltr 37,500.00
12 Gypsum Board (120 cm x 240 cm x 9 mm) lbr 60,000.00
13 Compound gypsum Kg 10,000.00
14 Kassa m' 310.00
15 C channel galvanis lebar 40 mm M' 7,000.00
16 Hollow galvanis 20x40x0,4 mm M' 6,200.00
17 Hollow galvanis 40x40x0,4 mm M' 8,100.00
18 Paku sekrup Kg 17,000.00
19 Chemical liter 130,000.00
20 Ubin Keramik 60 x 60 cm Buah 105,555.56
21 Portland Semen Kg 1,125.00
22 Pasir Pasang m3 350,000.00
23 Semen Warna Kg 11,000.00
24 Pintu Allumunium Coating Putih m' 105,000.00
25 Profil Kaca m' 5,000.00
26 Sealant tube 50,000.00
27 Kabel NYY 3 x 0,75 m 10,500.00
28 Knee 3/4'' bh 3,900.00
29 Lem Pipa bh 19,500.00
30 Knee 1'' bh 5,400.00
31 Mesin KTH 0,33 Hp unit 2,015,000.00
32 Sock Drat Luar 1/2'' bh 11,700.00
33 Sock Drat Dalam 1/2'' bh 11,700.00
34 Knee 1 1/2'' bh 14,300.00
35 Pipa 3/4'' m' 6,662.50
36 Sock 2'' bh 4,500.00
37 klem 3/4'' bh 1,500.00
38 Portland Semen kg 1,125.00
39 Pasir Pasang m3 350,000.00
40 Ubin Keramik 30 x 30 cm bh 6,444.44

DAFTAR UPAH PEKERJA

NO. JENIS PEKERJAAN SATUAN HARGA (Rp.)


1 Pekerja Hr 80,000
2 Mandor Hr 125,000
3 Tukang cat Hr 120,000
4 Kep. tk. cat Hr 135,000
5 Tukang listrik Hr 125,000
6 Tukang kayu Hr 120,000
7 Kep. tk. kayu Hr 135,000
8 Tukang batu Hr 120,000
9 Kep. tk. batu Hr 135,000
10 Tukang besi Hr 120,000
11 Kep. tk. besi Hr 135,000
DAFTAR ANALISA
UNIVERSITAS NEGERI SEMARANG

PEKERJAAN =

LOKASI =
TAHUN ANGGARAN = 2019

HARGA SATUAN JUMLAH HARGA TOTAL HARGA


No VOLUME ANALISA PEKERJAAN
(Rp.) (Rp.) (Rp.)
1 2 3 4 5 6

1 1 m2 Pengikisan / pengerokan Permukaan Cat Tembok Lama


A Tenaga
0.15 OH Pekerja 80,000.00 12,000.00
0.0030 OH Mandor 125,000.00 375.00
B Bahan
0.05 Kg Soda Api 13,000.00 650.00
C PERALATAN
D Jumlah A + B + C 13,025.00
E Overhead & Profit (contoh 10%) 10% 1,302.50
F Harga Satuan Pekerjaan (D+E) 14,327.50
2 1 m2 Lapis Prime Coat
A Tenaga
0.002 OH Pekerja 80,000.00 128.00
0.0004 OH Mandor 125,000.00 50.00
B Bahan
0.89 Kg Prime Coat 7,800.00 6,930.30
0.25 Liter Kerosene 4,200.00 1,065.96
C PERALATAN
0.0031 jam Asphalt Sprayer 135,000 418.50
0.0031 jam Compressor 310,000 961.00
1 ls Sewa Alat bantu @ 3 alat 10 10.00
-
D Jumlah A + B + C 9,563.76
E Overhead & Profit (contoh 10%) 10% 956.38
F Harga Satuan Pekerjaan (D+E) 10,520.14
3 1 m2 Lapis Aspal
A Tenaga
0.002 OH Pekerja 80,000.00 128.00
0.0004 OH Mandor 125,000.00 50.00
B Bahan
0.89 Kg Aspal 8,709.68 7,738.55
0.25 Liter Kerosene 4,200.00 1,065.96
C PERALATAN
0.0031 jam Asphalt Sprayer 135,000 418.50
0.0031 jam Compressor 310,000 961.00
1 ls Sewa Alat bantu @ 3 alat 10 10.00
-
D Jumlah A + B + C 10,372.01
E Overhead & Profit (contoh 10%) 10% 1,037.20
F Harga Satuan Pekerjaan (D+E) 11,409.21
10 1 m2
A Tenaga
0.33 OH Pekerja 200,000.00 66,000.00
0.010 OH Mandor 260,000.00 2,600.00

D Jumlah A + B + C 68,600.00
E Overhead & Profit (contoh 10%) 10% 6,860.00
F Harga Satuan Pekerjaan (D+E) 75,460.00
HARGA PERKIRAAN SENDIRI ( HPS )
UNIVERSITAS NEGERI SEMARANG

PEKERJAAN =

LOKASI =
TAHUN ANGGARAN = 2019

HARGA SATUAN JUMLAH HARGA TOTAL HARGA


NO NAMA PEKERJAAN SATUAN VOLUME
( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7
A Pekerjaan Administrasi
1 Administrasi Dokumentasi ls 1.00 700,000.00 700,000.00
700,000.00
B Pekerjaan Persiapan
1 Pengerokan Lapisan Aquaproof Lama Lt III m2 1,083.14 14,327.50 15,518,688.35
2 Pembersihan Permukaan Lt III m2 1,083.14 4,000.00 4,332,560.00
3 Pemasakan Aspal Cair di Lt III ls 1.00 2,000,000.00 2,000,000.00
4 Langsiran Material ke lt III m3 21.25 75,460.00 1,603,630.64
23,454,878.99
C Pekerjaan Pemeliharaan Atap Lantai III Gedung LP2M
1 Pelapisan Plat Beton dengan Prime Coat ( Aspal Cair ) m2 1,083.14 10,520.14 11,394,780.11
2 Pelapisan Plat Beton dengan Aspal m2 1,083.14 11,834.68 12,818,612.50
3 Pelapisan Pasir Ayakan m3 11.83 450,000.00 5,324,130.00
29,537,522.61
Jumlah 53,692,401.60
PPN 10% 5,369,240.16
Aanemingsom 59,061,641.76
Dibulatkan 59,061,000.00
hitungan
#Pondasi
Vgalian 16
Vpondasi 9
Vurugan 16

#Beton
Vsloof 15/30 2
Vkolom 30/30 3
Vringbalk 15/30 4
Vrabat 5
Vplat 1

#Pasangan
Vbatamerah 30
Vplesteran 156
Vacian 204
Vsponengan 418
Vroaster 57

#Lantai
Vkeramik 78

#Pek. Besi
Vram 33
Vram pintu 13
Vengsel 3

#Pek. Cat
Vtembok 156
Vgenteng
Vbesi
Vkayu

#Atap
Vlisplank 47
Vrangka 133
Vkuda2 0.4