HARGA
NO. JENIS BAHAN SATUAN MINIMUM KET.
(Rp)
1 Pekerja Hr 46,500
2 Pekerja tak terlatih Hr 37,000
3 Mandor Hr 60,000
4 Buruh Semi Terlatih Hr 37,000
5 T u k a n g l i s t r i k / Buruh Terlatih Hr 41,000
6 Tukang kayu Hr 52,500
7 Kepala tukang Hr 55,000
8 Tukang batu Hr 52,500
9 Kep. tk. batu Hr 55,000
10 Tukang besi Hr 52,500
11 Kep. tk. besi Hr 55,000
12 Tukang cat Hr 52,500
13 Kep. tk. cat Hr 55,000
14 Tukang plitur Hr 52,500
15 Tukang jalan Hr 37,000
16 Tukang gali Hr 37,000
17 Tukang masak aspal Hr 37,000
18 Tk. leideng Hr 52,500
19 M a s i n i s / Operator Hr 55,000
20 Pemb. Masinis Hr 37,000
21 Penjaga api Hr 37,000
22 Penjaga malam Hr 37,000
23 Sopir Hr 45,000
24 Pembantu Sopir Hr 41,000
25 Tukang Listrik Hr 52,500
HARGA SATUAN MATERIAL DAN UPAH
KABUPATEN KEBUMEN
TAHUN ANGGARAN 2015
1 2 3
Bahan dan Material
1 Abu Batu m3 120,000.00
2 AC Split 2 PK Panasonic Type CS-CU-C 18E K unit 195,000.00
3 Air Liter 3.18
4 Akustik 30 cm x 30 cm Lembar 5,400.00
5 Akustik 30 cm x 60 cm Lembar 13,500.00
6 Akustik 60 cm x 120 cm Lembar 43,100.00
7 Alat bantu Set 127,200.00
8 Alluminium strip m’ 7,500.00
9 Alumunium Foil m2 12,000.00
10 Amplas Lbr 2,000.00
11 Angkur / dok kg 16,000.00
12 Asbes gelombang ( 1,80 X 1,08 M ) X 6 MM lbr 30,000.00
13 Asbes gelombang ( 1,80X 0,92 m ) X 5 mm lbr 30,000.00
14 Asbes Gelombang ( 2,25 X 0,92 M ) X 5 MM lbr 74,500.00
15 Asbes gelombang ( 3,.X 1,05 m ) X 4 mm lbr 70,000.00
16 Asbes Gelombang ( 3,00X 1,05 m ) X 4 mm lbr 81,800.00
17 Asbes gelombang 80 x 180 cm lembar 30,000.00
18 Asbes gelombang besar 200 x 102cm x 5mm lembar 66,300.00
19 Asbes gelombang besar 250 x 102cm x 5mm lembar 95,400.00
20 Asbes gelombang besar 225 x 102 x 5mm lembar 85,000.00
21 Asbes semen m2 15,000.00
22 Atap polycarbonate m2 155,800.00
23 Bahan teraso cor m3 72,900.00
24 Baja Konstruksi kg 20,000.00
25 Baja strip (0,2 x 2) cm kg 30,900.00
26 Baja Tralis kg 31,300.00
27 Baja Tulangan Beton / Besi Beton kg 10,000.00
28 Bak mandi Sudut fibre buah 150,000.00
29 Bambu Æ 6-8/600 cm Bt 11,800.00
30 Bata merah Buah 600.00
31 Bata pelapis dinding Buah 6,000.00
32 Batako 10 x 16,5 x 40 buah 2,500.00
33 Batu bata bh 600.00
34 Batu belah 10/15 m3 120,000.00
35 Batu belah 15 cm/20 cm m3 135,000.00
36 Batu belah/batu gunung m3 137,450.00
37 Batu cincin (20 - 25 kg) karung 35,000.00
38 Batu granit kg 1,800.00
39 Batu Kali m3 125,000.00
40 Batu kerikil m3 127,200.00
41 Batu koral kg 140,000.00
42 Batu paras m2 127,200.00
43 Batu Pecah 0,5-1 cm (crusser ) m3 175,000.00
44 Batu Pecah 10-15 cm m3 140,000.00
45 Batu Pecah 1-2 cm (manual) m3 150,000.00
46 Batu pecah 1-2 cm crusher m3 175,000.00
47 Batu pecah 15-20 cm m3 140,000.00
48 Batu Pecah 2-3 cm (manual) m3 190,900.00
49 Batu pecah 2-3 cm crusher m3 231,800.00
No Material dan Upah Satuan Minimal
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.2. Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,87
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.6. Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,87
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
Kebumen,
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN KEBUMEN
1 2 3 4 5
1 2 3 4 5
1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.1. m³ 771,578.64
2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,87 A.4.1.1.2. m³ 810,915.11
3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = A.4.1.1.3. m³ 841,796.04
0,87
4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) A.4.1.1.4. m³ 717,942.19
cm, w/c = 0,87
5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = A.4.1.1.5. m³ 878,288.86
0,87
6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = A.4.1.1.6. m³ 913,169.38
0,87
7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = A.4.1.1.7. m³ 939,223.83
0,87
8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = A.4.1.1.8. m³ 956,480.00
0,87
9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = A.4.1.1.9. m³ 986,064.03
0,87
10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = A.4.1.1.10. m³ 995,282.81
0,87
11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = A.4.1.1.11. m³ 1,065,861.33
0,87
12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = A.4.1.1.12. m³ 1,077,898.31
0,87
13 Membuat 1 m3 beton kedap air dengan strorox – 100 A.4.1.1.13. m³ 1,133,413.60
14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm A.4.1.1.14. m' 95,465.70
15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm A.4.1.1.15. m' 147,412.54
16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm A.4.1.1.16. m' 148,154.60
17 Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 139,737.51
18 Pemasangan 10 kg kabel presstressed polos/strands A.4.1.1.18. kg 135,997.84
19 Pemasangan 10 kg jaring kawat baja (wiremesh) A.4.1.1.19. kg 27,342.92
20 Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20. m² 188,082.40
21 Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21. m² 204,032.40
22 Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22. m² 321,966.70
23 Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23. m² 331,536.70
24 Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24. m² 365,966.70
25 Pemasangan 1 m2 bekisting untuk dinding A.4.1.1.25. m² 343,416.70
26 Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.26. m² 289,186.70
27 Pemasangan 1 m2 jembatan untuk pengecoran beton A.4.1.1.27. m² 111,854.49
28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) A.4.1.1.28. m³ 3,975,470.84
29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) A.4.1.1.29. m³ 4,927,452.75
30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) A.4.1.1.30. m³ 8,005,598.15
31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) A.4.1.1.31. m³ 6,167,069.70
32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) A.4.1.1.32. m³ 5,507,389.25
33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) A.4.1.1.33. m³ 5,291,565.84
34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) A.4.1.1.34. m³ 5,706,912.75
35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35. m' 69,624.39
36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36. m' 95,458.00
1 2 3 4 5
6 Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm A.4.2.1.6. m² 213,358.51
7 Pemasangan 1 m2 pintu rolling door besi A.4.2.1.7. m² 603,004.38
8 Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC A.4.2.1.8. m² 464,412.74
9 Pemasangan 1 m2 sunscreen alluminium A.4.2.1.9. m² 165,142.12
10 Pemasangan 1 m2 rolling door alluminium A.4.2.1.10. m² 582,983.50
11 Pemasangan 1 m kusen pintu alluminium A.4.2.1.11. m' 106,447.92
12 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm A.4.2.1.12. m² 519,799.73
13 Pemasangan 1 m2 pintu kaca rangka alluminium A.4.2.1.13. m² 563,714.58
14 Pemasangan 1 m2 venetions blinds dan Vertical blinds A.4.2.1.14. m² 55,582.89
15 Pemasangan 1 m2 terali besi strip (2 x 3) mm A.4.2.1.15. m² 379,872.83
16 Pemasangan 1 m2 kawat nyamuk A.4.2.1.16. m² 83,178.38
17 Pemasangan 1 m2 jendela nako & tralis A.4.2.1.17. m² 266,600.73
18 Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm A.4.2.1.18. m' 205,134.11
19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm A.4.2.1.19. m' 72,039.99
20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, A.4.2.1.20. m² 962,992.87
dinding partisi
21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon A.4.2.1.21. m² 1,109,749.56
1 2 3 4 5
VII A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. A.4.4.2.1. m² 57,285.14
2 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. A.4.4.2.2. m² 50,135.14
3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. A.4.4.2.3. m² 47,017.96
4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm A.4.4.2.4. m² 44,909.70
5 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm A.4.4.2.5. m² 43,686.94
6 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. A.4.4.2.6. m² 42,719.16
7 Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm A.4.4.2.7. m² 42,179.06
8 Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm A.4.4.2.8. m² 41,638.96
9 Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm A.4.4.2.9. m² 45,102.53
10 Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm A.4.4.2.10. m² 42,922.33
11 Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm A.4.4.2.11. m² 38,000.00
12 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm A.4.4.2.12. m² 38,323.73
13 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm A.4.4.2.13. m² 67,059.08
14 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm A.4.4.2.14. m² 53,367.27
15 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. A.4.4.2.15. m² 60,034.26
16 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm A.4.4.2.16. m² 58,461.48
17 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm A.4.4.2.17. m² 57,113.54
18 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm A.4.4.2.18. m² 52,512.52
19 Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm A.4.4.2.19. m² 28,013.59
20 Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm A.4.4.2.20. m² 38,738.92
21 Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm A.4.4.2.21. m² 91,873.65
22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm A.4.4.2.22. m² 297,056.00
23 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP A.4.4.2.23. m² 35,151.05
24 Pemasangan 1 m2 finishing siar pasangan bata merah A.4.4.2.24. m² 20,440.53
25 Pemasangan 1 m2 finishing siar pasangan conblock ekspose A.4.4.2.25. m² 9,801.55
26 Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. A.4.4.2.26. m² 42,985.80
27 Pemasangan 1 m2 acian. A.4.4.2.27. m² 25,825.25
1 2 3 4 5
25 Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm A.4.4.3.25. m² 36,900.01
26 Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm A.4.4.3.26. m² 26,099.21
27 Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 30cm A.4.4.3.27. m² 26,157.05
28 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm A.4.4.3.28. m² 25,821.18
29 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 40cm A.4.4.3.29. m² 26,174.56
30 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm A.4.4.3.30. m² 26,157.05
31 Pemasangan 1m2 lantai teraso cor di tempat, tebal 3cm A.4.4.3.31. m² 41,721.90
32 Pemasangan 1m2 lantai keramik artistik 10cm x 20cm A.4.4.3.32. m² 187,701.68
33 Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm A.4.4.3.33. m² 192,527.93
34 Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm A.4.4.3.34. m² 174,271.04
35 Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm A.4.4.3.35. m² 174,465.50
36 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm A.4.4.3.36. m² 175,862.78
37 Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border A.4.4.3.37. m² 242,979.79
38 Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm A.4.4.3.38. m² 820,427.99
39 Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm A.4.4.3.39. m' 23,500.15
40 Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm A.4.4.3.40. m' 23,768.28
41 Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm A.4.4.3.41. m' 19,177.14
42 Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm A.4.4.3.42. m' 115,742.01
43 Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm A.4.4.3.43. m² 932,925.40
44 Pemasangan 1 m2 lantai karpet A.4.4.3.44. m² 86,427.11
45 Pemasangan 1 m2 underlayer (pelapis bawah karpet) A.4.4.3.45. m² 6,266,574.27
46 Pemasangan 1 m2 lantai parquet kayu A.4.4.3.46. m² 222,392.50
47 Pemasangan 1 m2 lantai kayu gymfloor A.4.4.3.47. m² 222,392.50
48 Pemasangan 1 m2 dinding porslen 11cm x 11cm A.4.4.3.48. m² 232,601.60
49 Pemasangan 1 m2 dinding porslen 10cm x 20cm A.4.4.3.49. m² 237,271.99
50 Pemasangan 1 m2 dinding porslen 20cm x 20cm A.4.4.3.50. m² 226,766.55
51 Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm A.4.4.3.51. m² 432,408.35
52 Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm A.4.4.3.52. m² 434,017.10
53 Pemasangan 1 m2 dinding keramik 10cm x 20cm A.4.4.3.53. m² 235,508.35
54 Pemasangan 1 m2 dinding keramik 20cm x 20cm A.4.4.3.54. m² 242,221.10
55 Pemasangan 1 m2 dinding marmer 100cm x 100cm A.4.4.3.55. m² 1,040,442.15
56 Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm A.4.4.3.56. m² 503,779.65
57 Pemasangan 1 m2 dinding batu paras A.4.4.3.57. m² 251,539.75
58 Pemasangan 1 m2 dinding batu tempel hitam A.4.4.3.58. m² 253,189.75
59 Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm A.4.4.3.59. m² 941,251.19
60 Pemasangan 1 m2 wallpaper lebar 50 cm A.4.4.3.60. m² 65,450.73
61 Pemasangan 1m2 floor harderner A.4.4.3.61. m² 127,158.02
62 Pemasangan 1 m’ plint vynil 15cm x 30cm A.4.4.3.62. m² 152,150.68
63 Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm A.4.4.3.63. m² 47,848.02
1 2 3 4 5
1 Pemasangan 1 m2 atap genteng palentong kecil A.4.5.2.1. m² 59,787.92
2 Pemasangan 1 m2 atap genteng kodok A.4.5.2.2. m² 68,075.15
3 Pemasangan 1 m2 atap genteng palentong besar/super A.4.5.2.3. m² 69,285.15
4 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m' 76,712.46
5 Pemasangan 1 m’ bubung genteng kodok glazuur A.4.5.2.5. m' 91,012.46
6 Pemasangan 1 m’ bubung genteng palentong besar A.4.5.2.6. m' 72,972.46
7 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm A.4.5.2.8. m² 90,191.75
8 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm A.4.5.2.9. m² 66,145.75
9 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm A.4.5.2.10. m² 60,195.30
10 Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm A.4.5.2.11. m² 61,427.30
11 Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm A.4.5.2.12. m² 54,604.55
12 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm A.4.5.2.13. m² 51,197.30
13 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm A.4.5.2.14. m² 37,359.30
14 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm A.4.5.2.15. m² 37,865.30
15 Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm A.4.5.2.16. m² 42,947.30
16 Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm A.4.5.2.17. m² 45,172.97
17 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm A.4.5.2.18. m² 43,006.70
18 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm A.4.5.2.19. m² 45,018.23
19 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm A.4.5.2.20. m² 43,084.07
20 Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm A.4.5.2.21. m² 43,006.70
21 Pemasangan 1 m’ nok stel rata 0,92m A.4.5.2.28. m' 60,770.93
22 Pemasangan 1 m’ nok stel rata 1,05m A.4.5.2.29. m' 63,176.79
23 Pemasangan 1 m2 atap seng gelombang A.4.5.2.38. m² 50,725.40
24 Pemasangan 1 m’nok atap seng A.4.5.2.39. m' 30,235.37
25 Pemasangan 1 m2 alumunium foil/sisalation A.4.5.2.42. m² 27,344.24
2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II A.4.6.1.2. m³ 11,043,972.50
atau III
3 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II A.4.6.1.3. m² 411,954.29
4 Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III A.4.6.1.4. m² 231,554.29
5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II A.4.6.1.5. m² 611,517.50
6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II A.4.6.1.6. m² 425,898.00
7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II A.4.6.1.7. m² 723,925.00
8 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup A.4.6.1.8. m² 490,688.00
(lebar sampai 90 cm)
9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II A.4.6.1.9. m² 477,092.50
10 Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II A.4.6.1.10. m² 685,422.10
11 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I A.4.6.1.11. m² 654,249.75
12 Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II A.4.6.1.12. m² 293,085.54
13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III A.4.6.1.13. m³ 10,023,750.00
bentang 6 meter
14 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I A.4.6.1.14. m³ 18,190,081.25
15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II A.4.6.1.15. m³ 10,784,331.25
16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II A.4.6.1.16. m² 153,255.85
17 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II A.4.6.1.17. m² 169,425.85
18 Pemasangan 1 m2 rangka atap sirap, kayu kelas II A.4.6.1.18. m² 109,047.73
19 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III A.4.6.1.19. m² 57,675.75
20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III A.4.6.1.20. m² 91,628.90
21 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II A.4.6.1.21. m' 106,431.05
22 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II A.4.6.1.22. m' 107,283.55
23 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III A.4.6.1.23. m² 123,328.90
NO. KODE HARGA SATUAN
URAIAN PEKERJAAN ANALISA SATUAN 2017
(Rp.)
1 2 3 4 5
24 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II A.4.6.1.24. m² 355,745.39
25 Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II A.4.6.1.25. m² 357,209.60
26 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I A.4.6.1.26. m² 275,357.50
27 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm A.4.6.1.27. m² 45,712.59
28 Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV A.4.6.1.28. m² 65,597.40
1 2 3 4 5
8 Pemasangan 1 buah bak mandi teraso vol 0,30 m3 A.5.1.1 9. bh 862,247.10
9 Pemasangan 1 buah bak air fibreglass vol 1 m3 A.5.1.1 10. bh 345,413.20
10 Pemasangan 1 buah bak beton volume 1 m3 A.5.1.1 11. bh 4,757,722.03
11 Pemasangan 1 buah bak cuci piring stainlessteel A.5.1.1 12. bh 269,222.25
12 Pemasangan 1 buah bak cuci piring teraso A.5.1.1 13. bh 324,788.75
13 Pemasangan 1 buah floor drain A.5.1.1 14. bh 27,040.75
14 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1 15. bh 347,674.47
15 Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm A.5.1.1 16. bh 525,364.95
16 Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm A.5.1.1 17. bh 665,066.05
17 Pemasangan 1 m’ pipa galvanis diameter ½” A.5.1.1 18. m' 32,440.19
18 Pemasangan 1 buah kran diameter ½” atau 3/4” A.5.1.1 19. bh 53,505.10
19 Pemasangan 1 m pipa galvanis diameter 3/4” A.5.1.1 20. m' 38,052.48
20 Pemasangan 1 m’ pipa galvanis diameter 1” A.5.1.1 21. m' 48,708.73
21 Pemasangan 1 m’ pipa galvanis diameter 1 ½” A.5.1.1 22. m' 139,663.30
Pemasangan 1 m’ pipa galvanis diameter 2” A.5.1.1 22.a m' 148,756.63
22 Pemasangan 1 m’ pipa galvanis diameter 3” A.5.1.1 23. m' 162,597.27
23 Pemasangan 1 m’ pipa galvanis diameter 4” A.5.1.1 24. m' 256,372.27
25 Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” A.5.1.1 25. m' -
24 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” A.5.1.1 26. m' 17,216.32
25 Pemasangan 1 m’ pipa PVC tipe AW diameter 1” A.5.1.1 27. m' 21,905.07
26 Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” A.5.1.1 28. m' 27,955.73
27 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” A.5.1.1 29. m' 69,301.98
28 Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” A.5.1.1 30. m' 59,158.06
29 Pemasangan 1 m’ pipa PVC tipe AW diameter 3” A.5.1.1 31. m' 72,798.06
30 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” A.5.1.1 32. m' 83,880.56
31 Pemasangan 1 m’ pipa beton diameter 15 – 20 cm A.5.1.1 35. m' 109,905.50
32 Pemasangan 1 m’ pipa beton diameter 30 – 100 cm A.5.1.1.36. m' 179,449.05
1 2 3 4 5
70 Pemasangan 1 m pipa baja Ø 300 mm A.8.4.1.70. m' 1,501,313.95
71 Pemasangan 1 m pipa baja Ø 400 mm A.5.1.1 20. m' 2,461,459.26
72 Pemasangan 1 m pipa baja Ø 450 mm A.8.4.1.72. m' 2,976,467.74
73 Pemasangan 1 m pipa baja Ø 500 mm A.8.4.1.73. m' 3,275,534.00
74 Pemasangan 1 m pipa baja Ø 600 mm A.8.4.1.74. m' 4,941,088.09
1 2 3 4 5
7 Pengetesan 1 m pipa Ø 300 mm A.8.4.5.7 m' 1,284.62
8 Pengetesan 1 m pipa Ø 400 mm A.8.4.5.8 m' 1,477.01
9 Pengetesan 1 m pipa Ø 500 mm A.8.4.5.9 m' 1,588.95
10 Pengetesan 1 m pipa Ø 600 mm A.8.4.5.10 m' 2,026.20
Kebumen,
HARGA SATUAN (
No. JENIS PEKERJAAN ANALISA SATUAN
Rp )
A PEKERJAAN PEMBANGUNAN RUANG KELAS BARU
I PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank A.2.2.1.4 m' 47,200.00
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m A.2.3.1.1. m3 #DIV/0!
2 Pengurugan kembali 1 m3 galian tanah A.2.3.1.9. m3 #DIV/0!
3 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 #DIV/0!
III PEKERJAAN PASANGAN
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP A.3.2.1.2. m2 #DIV/0!
2 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP A. 4.4.1.11. m2 #DIV/0!
3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. A.4.4.2.3. m2 #DIV/0!
4 Pemasangan 1 m2 acian. A.4.4.2.27. m2 #DIV/0!
IV PEKERJAAN BETON
1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) A.4.1.1.1. m3 #DIV/0!
2 Membuat 1 m’ kolom praktis beton bertulang (15 x 15) cm A.4.1.1.35. m' #DIV/0!
3 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) A.4.1.1.28. m3 4,814,583.33
4 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36. m' #DIV/0!
V PEKERJAAN KUNCI DAN KACA
1 Pemasangan Kaca tebal 5 mm A.4.6.2.17. m2 #DIV/0!
2 Pemasangan 1 buah kunci tanam biasa A.4.6.2.2. bh #DIV/0!
3 Pemasangan 1 buah engsel pintu A.4.6.2.5. bh #DIV/0!
4 Pemasangan 1 buah engsel jendela kupu-kupu A.4.6.2.6. bh #DIV/0!
5 Pemasangan 1 buah kait angin A.4.6.2.9. bh #DIV/0!
VI PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm A.4.5.1.7. m2 #DIV/0!
2 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III A.4.6.1.20. m2 #DIV/0!
VII PEKERJAAN ATAP
1 Pemasangan Rangka Atap Genteng Keramik, Kayu Tahun A.4.6.1.16 m2 #DIV/0!
2 Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu Tahun A.4.6.1.13 m3 #DIV/0!
3 Pemasangan konstruksi Gording, Kayu Tahun A.4.6.1.15 m3 #DIV/0!
VIII PEKERJAAN PENUTUP ATAP
1 Pemasangan Atap Genteng Plentong Kecil A.4.5.2.1 m2 #DIV/0!
2 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m' #DIV/0!
3 Pemasangan Listplank Uk. (3x20)cm GRC A.4.6.1.21 m' #DIV/0!
IX PEKERJAAN PINTU DAN JENDELA
1 Pembuatan & Pemasangan Kosen Pintu Kayu Tahun A.4.6.1.2 m3 #DIV/0!
2 Pembuatan & Pemasangan Daun Pintu, Kayu Tahun A.4.6.1.5 m2 #DIV/0!
X PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pemasangan 1m2 keramik lantai ukuran 40 cm x 40 cm A.4.4.3.36. m2 #DIV/0!
XI PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.10. m2 #DIV/0!
2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) A.4.7.1.4 m2 #DIV/0!
XII PEKERJAAN INSTALASI LISTRIK
1 Stop Kontak Ls bh #DIV/0!
2 Lampu TL 18 Watt Ls bh #DIV/0!
3 Saklar Tungal Ls bh #DIV/0!
4 Saklar Double Ls bh #DIV/0!
5 Instalasi Listrik Ls titik #DIV/0!
DAFTAR HARGA SATUAN PEKERJAAN
HARGA SATUAN (
No. JENIS PEKERJAAN ANALISA SATUAN
Rp )
XIII PERANCAH
1 Bambu Ls btg 19,500.00
XIV MEUBELAIR
1 Meja Guru Ls bh 790,000.00
2 Kursi Guru Ls bh 200,000.00
3 Almari Ruang Kelas Ls bh 2,000,000.00
4 Rak Buku/Almari Loker Ls bh 2,500,000.00
5 Papan Absen Ls bh 200,000.00
6 Papan Tulis Ls bh 450,000.00
7 Meja Siswa Tunggal Ls bh 230,000.00
8 Kursi Siswa Ls bh 125,000.00
MENGETAHUI : MENYETUJUI :
KEPALA SEKOLAH PENANGGUNGJAWAB TEKNIS
SD N TAMBAK PROGATEN
JUMLAH TOTAL
NO JENIS PEKERJAAN
TERBILANG : EMPAT PULUH LIMA JUTA DUA RATUS EMPAT PILUH RIBU RUPIAH
MENGETAHUI : MENGETAHUI :
KEPALA DESA TEGALREJO SEKRETARIS DESA TEGALREJO
............................ ...............................
RENCANA ANGGARAN BIAYA
% KEMAJUAN
% TERHADAP
TARGET HARGA SATUAN ( JUMLAH HARGA REALISASI TERHADAP SETIAP
No. JENIS PEKERJAAN SELURUH
VOLUME Rp ) ( Rp ) FISIK BAGIAN
PEKERJAAN
PEKERJAAN
A PEKERJAAN PEMBANGUNAN RUANG KELAS BARU
I PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank 10.00 47,200.00 472,000.00 2.43 100.00 2.43
JUMLAH 472,000.00 2.43 2.43
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m - #DIV/0! - 0.00 100.00 0.00
2 Pengurugan kembali 1 m3 galian tanah - #DIV/0! - 0.00 100.00 0.00
3 Pengurugan 1 m3 dengan pasir urug - #DIV/0! - 0.00 100.00 0.00
JUMLAH - 0.00 0.00
III PEKERJAAN PASANGAN
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP - #DIV/0! - 0.00 100.00 0.00
2 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP - #DIV/0! - 0.00 100.00 0.00
3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. - #DIV/0! - 0.00 100.00 0.00
4 Pemasangan 1 m2 acian. - #DIV/0! - 0.00 100.00 0.00
JUMLAH - 0.00 0.00
IV PEKERJAAN BETON
1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) - #DIV/0! - 0.00 100.00 0.00
2 Membuat 1 m’ kolom praktis beton bertulang (15 x 15) cm - #DIV/0! - 0.00 100.00 0.00
3 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) 0.24 4,814,583.33 1,155,500.00 5.94 100.00 5.94
4 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm - #DIV/0! - 0.00 100.00 0.00
JUMLAH 1,155,500.00 5.94 5.94
V PEKERJAAN KUNCI DAN KACA
1 Pemasangan Kaca tebal 5 mm - #DIV/0! - 0.00 100.00 0.00
2 Pemasangan 1 buah kunci tanam biasa - #DIV/0! - 0.00 100.00 0.00
3 Pemasangan 1 buah engsel pintu - #DIV/0! - 0.00 100.00 0.00
4 Pemasangan 1 buah engsel jendela kupu-kupu - #DIV/0! - 0.00 100.00 0.00
5 Pemasangan 1 buah kait angin - #DIV/0! - 0.00 100.00 0.00
JUMLAH - 0.00 0.00
LAPORAN REALISASI KEMAJUAN FISIK PEKERJAAN
NAMA SEKOLAH : SD N TAMBAKPROGATEN
KECAMATAN : KLIRONG
JENIS PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU
BULAN KE : 1 (SATU)
TANGGAL : ...................................................
% KEMAJUAN
% TERHADAP
TARGET HARGA SATUAN ( JUMLAH HARGA REALISASI TERHADAP SETIAP
No. JENIS PEKERJAAN SELURUH
VOLUME Rp ) ( Rp ) FISIK BAGIAN
PEKERJAAN
PEKERJAAN
VI PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm - #DIV/0! - 0.00 100.00 0.00
2 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III - #DIV/0! - 0.00 100.00 0.00
JUMLAH - 0.00 0.00
VII PEKERJAAN ATAP
1 Pemasangan Rangka Atap Genteng Keramik, Kayu Kruwing - #DIV/0! - 0.00 100.00 0.00
2 Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu Kruwing - #DIV/0! - 0.00 100.00 0.00
3 Pemasangan konstruksi Gording, Kayu Kruwing - #DIV/0! - 0.00 100.00 0.00
JUMLAH 17,825,000.00 91.63 0.00
VIII PEKERJAAN PENUTUP ATAP
1 Pemasangan Atap Genteng Plentong Kecil - #DIV/0! - 0.00 100.00 0.00
2 Pemasangan 1 m’ bubung genteng palentong - #DIV/0! - 0.00 100.00 0.00
3 Pemasangan Listplank Uk. (0,8x20)cm GRC - #DIV/0! - 0.00 100.00 0.00
JUMLAH - 0.00 0.00
IX PEKERJAAN PINTU DAN JENDELA
1 Pembuatan & Pemasangan Kosen Pintu Kayu Kruwing - #DIV/0! - 0.00 100.00 0.00
2 Pembuatan & Pemasangan Daun Pintu, Kayu Kruwing - #DIV/0! - 0.00 100.00 0.00
JUMLAH - 0.00 0.00
X PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pemasangan 1m2 keramik lantai ukuran 30 cm x 30 cm - #DIV/0! - 0.00 100.00 0.00
JUMLAH - 0.00 0.00
XI PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) - #DIV/0! - 0.00 100.00 0.00
2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) - #DIV/0! - 0.00 100.00 0.00
JUMLAH - 0.00 0.00
XII PEKERJAAN INSTALASI LISTRIK
1 Stop Kontak - #DIV/0! - 0.00 100.00 0.00
2 Lampu TL 18 Watt - #DIV/0! - 0.00 100.00 0.00
3 Saklar Tungal - #DIV/0! - 0.00 100.00 0.00
4 Saklar Double - #DIV/0! - 0.00 100.00 0.00
5 Instalasi Listrik - #DIV/0! - 0.00 100.00 0.00
LAPORAN REALISASI KEMAJUAN FISIK PEKERJAAN
NAMA SEKOLAH : SD N TAMBAKPROGATEN
KECAMATAN : KLIRONG
JENIS PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU
BULAN KE : 1 (SATU)
TANGGAL : ...................................................
% KEMAJUAN
% TERHADAP
TARGET HARGA SATUAN ( JUMLAH HARGA REALISASI TERHADAP SETIAP
No. JENIS PEKERJAAN SELURUH
VOLUME Rp ) ( Rp ) FISIK BAGIAN
PEKERJAAN
PEKERJAAN
% KEMAJUAN
% TERHADAP
TARGET HARGA SATUAN ( JUMLAH HARGA REALISASI TERHADAP SETIAP
No. JENIS PEKERJAAN SELURUH
VOLUME Rp ) ( Rp ) FISIK BAGIAN
PEKERJAAN
PEKERJAAN
XIII PERANCAH
1 Bambu - 19,500.00 - 0.00 100.00 0.00
JUMLAH - 0.00 0.00
XIV MEUBELAIR
1 Meja Guru 1.00 790,000.00 - 0.00 100.00 0.00
2 Kursi Guru 1.00 200,000.00 - 0.00 100.00 0.00
3 Almari Ruang Kelas 1.00 2,000,000.00 - 0.00 100.00 0.00
4 Rak Buku/Almari Loker 1.00 2,500,000.00 - 0.00 100.00 0.00
5 Papan Absen 1.00 200,000.00 - 0.00 100.00 0.00
6 Papan Tulis 1.00 450,000.00 - 0.00 100.00 0.00
7 Meja Siswa Tunggal 32.00 230,000.00 - 0.00 100.00 0.00
8 Kursi Siswa 32.00 125,000.00 - 0.00 100.00 0.00
JUMLAH - 0.00 0.00
JUMLAH FISIK 19,452,500.00 100.00 8.37
JUMLAH TOTAL 19,452,000.00
A. REHAB GEDUNG TK
1. PEKERJAAN PERSIAPAN TENAGA VOLUME SATUAN HARGA SATUAN JUMLAH HARGA
a. Pengukuran dan Pemasangan Bowplank 10.000 m' Pekerja 3.00 HOK 70,000.00 210,000.00
Material Tukang 1.00 HOK 80,000.00 80,000.00
0.012 Kayu 5/5x 3 m Kayu lokal 0.12 m3 5.00 btg 40,000.00 200,000.00 JUMLAH A 290,000.00
0.020 Paku Biasa 2" - 5" 1.00 kg 22,000.00 22,000.00
0.007 Papan Cor 2/20 x 3 m 0.07 m3 2.00 lbr 50,000.00 100,000.00 Kayu 5/5x 3 m Kayu lokal 10.00 btg 40,000.00 400,000.00
Tenaga Paku Ukuran Variasi 1.00 kg 22,000.00 22,000.00
0.100 Pekerja 1.00 OH 70,000.00 70,000.00 Papan Cor 2/20 x 3 m 2.00 lbr 50,000.00 100,000.00
0.100 Tukang 1.00 OH 80,000.00 80,000.00 Pasir Urug 0.00 m3 208,000.00 -
Sub Total a 472,000.00 Tanah Urug 0.00 m3 180,000.00 -
b. Bongkaran Bangunan Lama - m3 Portland Semen 2.00 zak 74,250.00 148,500.00
Tenaga Batu Belah - m3 338,000.00 -
1.667 Pekerja - OH 70,000.00 - Pasir Pasang 1.00 m3 337,000.00 337,000.00
Sub Total b - Bata Merah - bh 900.00 -
2. PEKERJAAN TANAH Besi ø 12 mm - btg 165,000.00 -
a. Penggalian 1 m3 tanah biasa sedalam 1 m - m3 Split 2/3 1.00 m3 330,000.00 330,000.00
Tenaga Besi ø 10 mm - btg 102,600.00 -
0.750 Pekerja - OH 70,000.00 - Besi ø 8 mm - btg 68,400.00 -
Sub Total a - Kawat beton - kg 22,000.00 -
b. Pengurugan kembali 1 m3 galian tanah - m3 Roster - bh 20,000.00 -
Tenaga Kunci Slot - bh 500,000.00 -
0.250 Pekerja - OH 70,000.00 - Engsel pintu - bh 100,000.00 -
Sub Total b - Engsel jendela - bh 80,000.00 -
c. Urugan Pasir - m3 Baja Ringan + Galvalum (terpasang) 31.00 m2 575,000.00 17,825,000.00
Material Gypsum board - lbr 120,000.00 -
1.200 Pasir Urug - m3 208,000.00 - Paku skrup - bh 1,200.00 -
Tenaga Pemasangan Torn beserta pompa air dan acessories - set 4,500,000.00 -
0.300 Pekerja - OH 70,000.00 - Sekruw - kg 22,000.00 -
Sub Total c - Penambahan Daya 2200 VA - ls 7,500,000.00 -
d. Tanah Urug - m3 Besi Strip - kg 10,000.00 -
Material Kait angin - bh 40,000.00 -
1.200 Tanah Urug - m3 180,000.00 - Tulisan Gedung - set 7,000,000.00 -
Tenaga Hollow 40.40.1 - btg 95,000.00 -
0.300 Pekerja - OH 70,000.00 - GRC (3x20 cm) - lbr 80,000.00 -
Sub Total d - Keramik uk. 20 x 20 - dus 80,000.00 -
3. PEKERJAAN PASANGAN Keramik uk. 20 x 40 - dus 110,000.00 -
a. Pas. Batu Kali 1 Pc : 4 Ps - m3 Pipa PVC Ø ½" - m' 10,000.00 -
Material Pipa PVC Ø 2" - m' 27,000.00 -
163.000 Portland Semen - kg 0 zak 74,250.00 - Keramik uk. 60 x 60 - dus 265,000.00 -
1.170 Batu Belah - m3 338,000.00 - Semen warna - kg 12,000.00 -
0.520 Pasir Pasang - m3 337,000.00 - Plamir - kg 50,000.00 -
Tenaga Cat Tembok - kg 50,000.00 -
1.500 Pekerja - OH 70,000.00 - Kusen Pintu Double Almunium - unit 800,000.00 -
0.750 Tukang Batu - OH 80,000.00 - Daun Pintu Double Almunium - unit 4,800,000.00 -
Sub Total a - Kusen Pintu Almunium - unit 800,000.00 -
b. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1/2 batu 1SP : 6PP - m2 Daun Pintu Aluminium - unit 2,200,000.00 -
Material Kusen Jendela Aluminium - unit 600,000.00 -
70.000 Bata Merah - bh 900.00 - Daun Jendela Aluminium - unit 1,200,000.00 -
8.320 Portland Semen - kg 0 zak 74,250.00 - Stop Kontak - bh 35,000.00 -
0.049 Pasir Pasang - m3 337,000.00 - Lampu TL 18 Watt - bh 95,000.00 -
Alat Saklar Tungal - bh 20,000.00 -
1.000 Alat Bantu Ls - - Saklar Double - bh 22,000.00 -
Tenaga Instalasi Listrik - bh 50,000.00 -
0.300 Pekerja - OH 70,000.00 - Pipa PVC Ø 3" - m' 34,000.00 -
0.100 Tukang Batu - OH 80,000.00 - Downlight - bh 230,000.00 -
Sub Total b - Umpak Atas - bh 400,000.00 -
c. Plesteran - m2 Umpak Bawah - bh 400,000.00 -
Material List Gypsum - bh 27,000.00 -
0.023 Pasir pasang - m3 337,000.00 - Closed Jongkok - bh 350,000.00 -
7.776 Portland Semen - kg 0 zak 74,250.00 - Tralis - m2 450,000.00 -
Tenaga Pintu KM Almunium - bh 1,250,000.00 -
0.300 Pekerja - OH 70,000.00 - Glasblock - bh 80,000.00 -
0.150 Tukang Batu - OH 80,000.00 - Floordrain - m2 40,000.00 -
Sub Total c - Bambu - btg 20,000.00 -
d. Acian - m2 List Beton - m' 10,000.00 -
Material Pipa PVC Ø 4" - m' 72,000.00 -
3.250 Portland Semen - kg 0 zak 74,250.00 - JUMLAH B 19,162,500.00
Tenaga JUMLAH FISIK (A+B) 19,452,500.00
0.200 Pekerja - OH 70,000.00 - JASA KONSULTAN 547,500.00
0.100 Tukang Batu - OH 80,000.00 - JUMLAH TOTAL 20,000,000.00
Sub Total d - PEMBULATAN 20,000,000.00
e. Roster Beton 20 x 40 - bh
Material
1.000 Roster - bh - bh 20,000.00 - -
1.460 Portland Semen - kg 0 zak 74,250.00 -
0.025 Pasir Pasang - m3 337,000.00 -
Alat
1.000 Alat Bantu Ls - -
Tenaga
0.100 Pekerja - OH 70,000.00 -
0.020 Tukang Batu - OH 80,000.00 -
Sub Total e -
4. PEKERJAAN BETON
a. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) - m3
Material
247.000 Portland Semen - kg 0 zak 74,250.00 -
869.000 Pasir Pasang - kg - m3 337,000.00 -
999.000 Split 2/3 - kg - m3 330,000.00 -
Tenaga
1.650 Pekerja - OH 70,000.00 -
0.275 Tukang batu - OH 80,000.00 -
Sub Total a -
b. Membuat 1 m’ kolom praktis beton bertulang - m'
Material
0.002 Kayu Kaso 5/5 x 3 m - m3 0 btg 40,000.00 -
0.008 Papan Cor 2/20 x 3 m - m3 0 lbr 50,000.00 -
0.010 Paku 5 cm – 12 cm - kg 22,000.00 -
3.000 Besi beton polos - kg - -
Besi ø 10 mm - m - btg 102,600.00 -
Besi ø 8 mm - m - btg 68,400.00 -
0.045 Kawat beton - kg 22,000.00 -
4.000 Portland Semen - kg 0 zak 74,250.00 -
0.006 Pasir Pasang - m3 337,000.00 -
0.009 Split 2/3 - m3 330,000.00 -
Tenaga
0.180 Pekerja - OH 70,000.00 -
0.020 Tukang batu - OH 80,000.00 -
0.020 Tukang kayu - OH 80,000.00 -
0.020 Tukang besi - OH 80,000.00 -
Sub Total b -
c. Membuat 1 m3 pondasi beton bertulang 0.240 m3
Material
0.200 Kayu Tahun Kaso 5/5 x 3 m 0.05 m3 5 btg 40,000.00 200,000.00
1.500 Paku 5 cm – 12 cm - kg 22,000.00 -
157.500 Besi beton polos - kg - -
Besi ø 10 mm - m - btg 102,600.00 -
2.250 Kawat beton - kg 22,000.00 -
336.000 Portland Semen 81.00 kg 2 zak 74,250.00 148,500.00
0.540 Pasir Pasang 1.00 m3 337,000.00 337,000.00
0.810 Split 2/3 1.00 m3 330,000.00 330,000.00
Tenaga
5.300 Pekerja 2.00 OH 70,000.00 140,000.00
0.275 Tukang batu - OH 80,000.00 -
1.300 Tukang kayu - OH 80,000.00 -
1.050 Tukang besi - OH 80,000.00 -
Sub Total c 1,155,500.00
d. Membuat 1 m3 kolom beton bertulang - m3
Material
0.320 Kayu Kaso 5/7 x 3 m - m3 0 btg 40,000.00 -
3.200 Paku 5 cm – 12 cm - kg 22,000.00 -
157.500 Besi beton polos - kg - -
Besi ø 12 mm - m 0 btg 165,000.00 -
Besi ø 8 mm - m 0 btg 68,400.00 -
2.250 Kawat beton - kg 22,000.00 -
336.000 Portland Semen - kg 0 zak 74,250.00 -
0.540 Pasir Beton - m3 337,000.00 -
0.810 Split 2/3 - m3 330,000.00 -
2.800 Papan 2/20 x 3 m - lb 50,000.00 -
Tenaga
7.050 Pekerja - OH 70,000.00 -
0.275 Tukang batu - OH 80,000.00 -
1.650 Tukang kayu - OH 80,000.00 -
2.100 Tukang besi - OH 80,000.00 -
Sub Total d -
e. Membuat 1 m3 balok beton bertulang - m3
Material
0.320 Kayu Kaso 5/7 x 3 m - m3 0 btg 40,000.00 -
3.200 Paku 5 cm – 12 cm - kg 22,000.00 -
210.000 Besi beton polos - kg - -
Besi ø 12 mm - m 0 btg 165,000.00 -
Besi ø 8 mm - m 0 btg 68,400.00 -
3.000 Kawat beton - kg 22,000.00 -
336.000 Portland Semen - kg 0 zak 74,250.00 -
0.540 Pasir Beton - m3 337,000.00 -
0.810 Split 2/3 - m3 330,000.00 -
2.800 Papan 2/20 x 3 m - lb 50,000.00 -
Tenaga
6.350 Pekerja - OH 70,000.00 -
0.275 Tukang batu - OH 80,000.00 -
1.650 Tukang kayu - OH 80,000.00 -
1.400 Tukang besi - OH 80,000.00 -
Sub Total e -
f. Membuat 1 m3 plat beton bertulang - m3
Material
0.240 Kayu Kaso 5/7 x 3 m - m3 0 btg 40,000.00 -
3.200 Paku 5 cm – 12 cm - kg 22,000.00 -
157.500 Besi beton polos - kg - -
Besi ø 10 mm - m 0 btg 102,600.00 -
2.250 Kawat beton - kg 22,000.00 -
336.000 Portland Semen - kg 0 zak 74,250.00 -
0.540 Pasir Beton - m3 337,000.00 -
0.810 Split 2/3 - m3 330,000.00 -
2.800 Papan 2/20 x 3 m - lb 50,000.00 -
Tenaga
5.300 Pekerja - OH 70,000.00 -
0.275 Tukang batu - OH 80,000.00 -
1.300 Tukang kayu - OH 80,000.00 -
1.050 Tukang besi - OH 80,000.00 -
Sub Total f -
e. Membuat 1 m’ ring balok beton bertulang - m3
Material
0.003 Kayu Tahun Kaso 5/5 x 3 m - m3 0 btg 40,000.00 -
0.011 Papan Cor 2/20 x 3 m - m3 0 lbr 50,000.00 -
0.020 Paku 5 cm – 12 cm - kg 22,000.00 -
Minyak bekisting - Ltr 16,000.00 -
3.600 Besi beton polos - kg - -
Besi ø 10 mm 40.00 m 0 btg 102,600.00 -
Besi ø 8 mm 36.00 m 0 btg 68,400.00 -
0.050 Kawat beton - kg 22,000.00 -
5.500 Portland Semen - kg 0 zak 74,250.00 -
0.009 Pasir Pasang - m3 337,000.00 -
0.015 Split 2/3 - m3 330,000.00 -
Tenaga
0.297 Pekerja - OH 70,000.00 -
0.033 Tukang batu - OH 80,000.00 -
0.033 Tukang kayu - OH 80,000.00 -
0.033 Tukang besi - OH 80,000.00 -
0.010 Kepala tukang - OH 80,000.00 -
Sub Total c -
5. PEKERJAAN ALUMINIUM DAN BESI
a. Pemasangan Tralis - m2
Material
1.000 Tralis - m2 450,000.00 -
Sub Total f -
5. PEKERJAAN KUNCI DAN KACA
a. Pemasangan Kaca tebal 5 mm - m2
Material
1.000 Kaca Bening 5 mm - m2 140,000.00 -
Tenaga
0.010 Pekerja - OH 70,000.00 -
0.500 Tukang Kayu - OH 80,000.00 -
Sub Total a -
b. Pemasangan Kunci Slot - bh
Material
1.000 Kunci Slot - bh 500,000.00 -
Tenaga
0.010 Pekerja - OH 70,000.00 -
0.500 Tukang Kayu - OH 80,000.00 -
Sub Total b -
c. Pemasangan 1 buah engsel pintu - bh
Material
1.000 Engsel pintu - bh 100,000.00 -
Tenaga
0.015 Pekerja - OH 70,000.00 -
0.150 Tukang Kayu - OH 80,000.00 -
Sub Total c -
d. Pemasangan 1 buah engsel jendela kupu-kupu - bh
Material
1.000 Engsel jendela - bh 80,000.00 -
Tenaga
0.010 Pekerja - OH 70,000.00 -
0.100 Tukang Kayu - OH 80,000.00 -
Sub Total d -
e. Pemasangan 1 buah kait angin - bh
Material
1.000 Kait angin - bh 40,000.00 -
Tenaga
0.015 Pekerja - OH 70,000.00 -
0.150 Tukang Kayu - OH 80,000.00 -
Sub Total e -
6. PEKERJAAN LANGIT-LANGIT (PLAFOND)
a. Pemasangan 1 m2 langit-langit gypsum board tebal 9 mm - m2
Material
0.364 Gypsum board - lbr 120,000.00 -
6.000 Paku skrup - bh 1,200.00 -
Tenaga
0.100 Pekerja - OH 70,000.00 -
0.050 Tukang Besi - OH 80,000.00 -
Sub Total a -
b. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, Hollow 40x40x1 - m2
Material
0.016 Hollow 40.40.1 - m3 0 btg 95,000.00 -
0.250 Sekruw - kg 22,000.00 -
Tenaga
0.200 Pekerja - OH 70,000.00 -
0.300 Tukang Besi - OH 80,000.00 -
Sub Total b -
7. PEKERJAAN ATAP
a. Pemasangan Rangka Atap Genteng Keramik, Kayu Kruwing - m2
Material
0.014 Kayu Kruwing Kaso 5/5 x 3 m - m3 0 btg 112,000.00 -
0.004 Reng Kruwing (2x3) cm - m3 0 btg 15,000.00 -
0.250 Paku Biasa 2" - 5" - kg 22,000.00 -
Tenaga
0.100 Pekerja - OH 70,000.00 -
0.100 Tukang Kayu - OH 80,000.00 -
Sub Total a -
b. Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu Kruwing - m2
Material
1.100 Kayu Kruwing, balok - m3 0 btg 310,000.00 -
15.000 Besi Strip - kg 10,000.00 -
5.600 Paku Biasa 2" - 5" - kg 22,000.00 -
Tenaga
4.000 Pekerja - OH 70,000.00 -
12.000 Tukang Kayu - OH 80,000.00 -
Sub Total b -
c. Pemasangan konstruksi Gording, Kayu Kruwing - m2
Material
1.100 Kayu Kruwing, balok - m3 0 btg 310,000.00 -
15.000 Besi Strip - kg 10,000.00 -
3.000 Paku Biasa 2" - 5" - kg 22,000.00 -
Tenaga
2.400 Pekerja - OH 70,000.00 -
7.200 Tukang Kayu - OH 80,000.00 -
Sub Total c -
d. Rangka Atap Baja Ringan + Galvalum 31.000 m2
Material
1.000 Baja Ringan + Galvalum (terpasang) 31.00 m2 575,000.00 17,825,000.00
0.200 Talang Karpet - m' 40,000.00 -
0.340 Talang U + accesories - m' 80,000.00 -
Sub Total d 17,825,000.00
8. PEKERJAAN LISPLANK
c. Pemasangan Listplank Uk. (3x20)cm GRC - m'
Material
0.104 GRC (3x20 cm) - lbr 80,000.00 -
0.100 Paku Biasa 2" - 5" - kg 22,000.00 -
Tenaga
0.100 Pekerja - OH 70,000.00 -
0.200 Tukang Kayu - OH 80,000.00 -
Sub Total c -
9. PEKERJAAN PINTU DAN JENDELA
a. Pembuatan & Pemasangan Kosen Pintu Double Almunium - unit
Material
1.000 Kusen Pintu Double Almunium - unit 800,000.00 -
Sub Total a -
b. Pembuatan & Pemasangan Daun Pintu Double Almunium - unit
Material
1.000 Daun Pintu Double Almunium - unit 4,800,000.00 -
Sub Total b -
c. Pembuatan & Pemasangan Kosen Pintu Almunium - unit
Material
1.000 Kusen Pintu Almunium - unit 800,000.00 -
Sub Total a -
d. Pembuatan & Pemasangan Daun Pintu Almunium - unit
Material
1.000 Daun Pintu Aluminium - unit 2,200,000.00 -
Sub Total b -
e. Pembuatan & Pemasangan Kosen Jendela Almunium - unit
Material
1.000 Kusen Jendela Aluminium - unit 600,000.00 -
Sub Total a -
f. Pembuatan & Pemasangan Daun Jendela Almunium - unit
Material
1.000 Daun Jendela Aluminium - unit 1,200,000.00 -
Sub Total b -
10. PEKERJAAN PENUTUP LANTAI
a. Pemasangan 1m2 lantai keramik ukuran 60 cm x 60 cm - m2
Material
2.778 Keramik uk. 60 x 60 - bh - dus 265,000.00 -
10.000 Portland Semen - kg 0 zak 74,250.00 -
0.045 Pasir pasang - m3 337,000.00 -
1.500 Semen warna - kg 12,000.00 -
Tenaga
0.700 Pekerja - OH 70,000.00 -
0.350 Tukang Batu - OH 80,000.00 -
Sub Total a -
b. Pemasangan 1m2 lantai keramik KM ukuran 20 cm x 20 cm - m2
Material
25.000 Keramik uk. 20 x 20 - bh - dus 80,000.00 -
10.000 Portland Semen - kg 0 zak 74,250.00 -
0.045 Pasir pasang - m3 337,000.00 -
1.500 Semen warna - kg 12,000.00 -
Tenaga
0.700 Pekerja - OH 70,000.00 -
0.350 Tukang Batu - OH 80,000.00 -
Sub Total a -
c. Pemasangan 1m2 keramik dinding ukuran 20 cm x 40 cm - m2
Material
12.500 Keramik uk. 20 x 40 - bh - dus 110,000.00 -
10.000 Portland Semen - kg 0 zak 74,250.00 -
0.045 Pasir pasang - m3 337,000.00 -
1.500 Semen warna - kg 12,000.00 -
Tenaga
0.700 Pekerja - OH 70,000.00 -
0.350 Tukang Batu - OH 80,000.00 -
Sub Total a -
11. PEKERJAAN PENGECATAN
a. Pengecatan 1 m2 tembok baru - m2
Material
0.100 Plamir - kg 50,000.00 -
0.100 Cat dasar - kg 50,000.00 -
0.260 Cat penutup - kg 50,000.00 -
Tenaga
0.020 Pekerja - OH 70,000.00 -
0.063 Tukang Cat - OH 80,000.00 -
Sub Total a -
b. Pengecatan 1 m2 kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) - m2
Material
0.200 Cat menie - kg 30,000.00 -
0.150 Plamuur - kg 50,000.00 -
0.170 Cat dasar - klg 25,000.00 -
0.260 Cat penutup - klg 25,000.00 -
0.010 Kuas - bh 10,000.00 -
0.030 Thinner - klg 15,000.00 -
0.200 Ampelas - bh 3,300.00 -
Tenaga
0.070 Pekerja - OH 70,000.00 -
0.009 Tukang Cat - OH 80,000.00 -
Sub Total a -
12. PEKERJAAN MECANICAL ELECTRICAL
1.000 Stop Kontak - bh 35,000.00 -
1.000 Lampu TL 18 Watt - bh 95,000.00 -
1.000 Downlight - bh 230,000.00 -
1.000 Saklar Tungal - bh 20,000.00 -
1.000 Saklar Double - bh 22,000.00 -
1.000 Instalasi Listrik - titik 50,000.00 -
1.000 Penambahan Daya 2200 VA - ls 7,500,000.00 -
Sub Total -
13. PEKERJAAN PLUMBING
a. Pengadaan dan pemasangan instalasi air bersih dia 1/2" PVC type AW - m'
Material
1.200 Pipa PVC Ø ½" - m' 10,000.00 -
0.350 Perlengkapan 35% x pipa - Ls 10,000.00 -
Tenaga
0.036 Pekerja - OH 70,000.00 -
0.060 Tukang Batu - OH 80,000.00 -
Sub Total a -
b. Pengadaan dan pemasangan instalasi air bekas dia 2" PVC type AW - m'
Material
1.200 Pipa PVC Ø 2" - m' 27,000.00 -
0.350 Perlengkapan 35% x pipa - Ls 27,000.00 -
Tenaga
0.054 Pekerja - OH 70,000.00 -
0.090 Tukang Batu - OH 80,000.00 -
Sub Total b -
c. Pengadaan dan pemasangan instalasi air hujan dia 3" PVC type AW - m'
Material
1.200 Pipa PVC Ø 3" - m' 34,000.00 -
0.350 Perlengkapan 35% x pipa - Ls 34,000.00 -
Tenaga
0.081 Pekerja - OH 70,000.00 -
0.135 Tukang Batu - OH 80,000.00 -
Sub Total c -
c. Pengadaan dan pemasangan instalasi air hujan dia 4" PVC type AW - m'
Material
1.200 Pipa PVC Ø 4" - m' 72,000.00 -
0.350 Perlengkapan 35% x pipa - Ls 72,000.00 -
Tenaga
0.081 Pekerja - OH 70,000.00 -
0.135 Tukang Batu - OH 80,000.00 -
Sub Total c -
14. PERANCAH
1.000 Bambu - btg 20,000.00 -
Sub Total -
15. LAIN-LAIN
0.000 Umpak Atas - bh 400,000.00 -
0.000 Umpak Bawah - bh 400,000.00 -
0.000 List Gypsum - bh 27,000.00 -
0.000 List Beton - m' 10,000.00 -
0.000 Closed Jongkok - bh 350,000.00 -
0.000 Kran Air - bh 90,000.00 -
0.000 Pintu KM Almunium - bh 1,250,000.00 -
0.000 Glasblock - bh 80,000.00 -
0.000 Floordrain - bh 40,000.00 -
1.000 Tulisan Gedung - set 7,000,000.00 -
1.000 Pemasangan Torn beserta pompa air dan acessories - set 4,500,000.00 -
Sub Total -
JASA KONSULTAN 547,500.00
JUMLAH FISIK 19,452,500.00
JUMLAH TOTAL 20,000,000.00
PEMBULATAN 20,000,000.00
PERHITUNGAN BACK UP VOLUME
II PEKERJAAN TANAH
Jumlah Lebar Panjang Tinggi
1 Galian tanah 1 Galian tanah
V = 1.00 x 0.80 x 50.00 x 1.00 = 40.00 - m3
= - x - x - x - = -
40.00
- m3
3 Urugan pasir 3 Urugan pasir
V = 0.10 x 0.70 x 47.00 x 1.00 = 3.29 - m3
= 20.00 x 0.70 x 0.70 x 0.10 = 0.98
4.27
4 Urugan Tanah 4 Urugan Tanah
V = 7.00 x 16.00 x 0.60 = 67.20 - m3
= 1.00 x 11.00 x 0.50 = 5.50
72.70
III PEKERJAAN PASANGAN
2 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP 2 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
L = 0.00 x 3.00 x 6.00 = - - m2
= 0.00 x - x - = -
= 0.00 x - x - = -
-
PERHITUNGAN BACK UP VOLUME
3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. 3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.
L = dua kali pasangan bata merah - m2
2 Membuat 1 m’ kolom praktis beton bertulang (15 x 15) cm 2 Membuat 1 m’ kolom praktis beton bertulang (15 x 15) cm
V = 12.00 x 4.00 x - = 48.00 - m'
= - x - x - = -
48.00
= - x - x - x - = 0.00
0.24
4 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) 4 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)
V K1 = 15.00 x 7.50 x 0.04 = 4.50 - m3
V K1 = - x 7.50 x 0.02 = -
V K2 = 4.00 x 5.00 x 0.07 = 1.41
5.91
5 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) 5 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
S1 = 1.00 x 6.00 x 0.03 = 0.18 - m3
6 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting) 6 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)
Teras V = 1.00 x 1.00 x 16.00 x 0.10 = 1.60 - m3
7 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 7 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
V = 1.00 x 6.00 x 1.00 = 6.00 ringbalok - m'
2 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 2 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
V = 1.00 x 16.00 x 7.00 = 112.00 - m2
= - x - x 7.00 = -
112.00
PERHITUNGAN BACK UP VOLUME
1 Rangka Atap Baja Ringan + Galvalume terpasang 1 Rangka Atap Baja Ringan + Galvalume terpasang
L = 2.00 x 10.00 x 1.15 = 23.00 31.00 m2
1 Pemasangan Listplank Uk. (0,8x20)cm GRC 1 Pemasangan Listplank Uk. (0,8x20)cm GRC
L = 30.00 x 0.30 = 30.00 - m'
1 Pembuatan & Pemasangan Kosen Pintu Double Almunium 1 Pembuatan & Pemasangan Kosen Pintu Double Almunium
V = - unit
2 Pembuatan & Pemasangan Daun Pintu Double Almunium 2 Pembuatan & Pemasangan Daun Pintu Double Almunium
V = - unit
3 Pembuatan & Pemasangan Kosen Pintu Almunium 3 Pembuatan & Pemasangan Kosen Pintu Almunium
V = - unit
4 Pembuatan & Pemasangan Daun Pintu Almunium 4 Pembuatan & Pemasangan Daun Pintu Almunium
V = - unit
5 Pembuatan & Pemasangan Kosen Jendela Almunium 5 Pembuatan & Pemasangan Kosen Jendela Almunium
V = - unit
6 Pembuatan & Pemasangan Daun Jendela Almunium 6 Pembuatan & Pemasangan Daun Jendela Almunium
V = - unit
1 Pemasangan 1m2 lantai keramik KM ukuran 20 cm x 20 cm 1 Pemasangan 1m2 lantai keramik KM ukuran 20 cm x 20 cm
L = 1.00 x 2.50 x 1.50 = 3.75 - m2
2 Pemasangan 1m2 keramik dinding KM ukuran 20 cm x 40 cm 2 Pemasangan 1m2 keramik dinding KM ukuran 20 cm x 40 cm
L = 7.00 x 2.50 x 1.00 = 17.50 - m2
1 Pemasangan 1m2 keramik lantai ukuran 60 cm x 60 cm 1 Pemasangan 1m2 keramik lantai ukuran 60 cm x 60 cm
V = 1.00 x 16.00 x 7.00 = 112.00 - m2
PERHITUNGAN BACK UP VOLUME
XI PEKERJAAN PENGECATAN
Pengecatan 1 m2 tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
1 1 Cat Tembok
V = sama dengan acian - m2
1 Pengadaan dan pemasangan instalasi air bersih dia 1/2" PVC type AW 1 Pengadaan dan pemasangan instalasi air bersih dia 1/2" PVC type AW
L = 1.00 x 20.00 = 20.00 - m'
2 Pengadaan dan pemasangan instalasi air bekas dia 2" PVC type AW 2 Pengadaan dan pemasangan instalasi air bekas dia 2" PVC type AW
L = 1.00 x 20.00 = 20.00 - m'
3 Pengadaan dan pemasangan instalasi air hujan dia 3" PVC type AW 3 Pengadaan dan pemasangan instalasi air hujan dia 3" PVC type AW
L = 2.00 x 16.00 = 32.00 - m'
4 Pengadaan dan pemasangan instalasi cloosed dia 4" PVC type AW 4 Pengadaan dan pemasangan instalasi cloosed dia 4" PVC type AW
L = 1.00 x 25.00 = 25.00 - m'
XIV PERANCAH
1 Bambu 1 Bambu
V = 50.0 btg - btg
PERHITUNGAN BACK UP VOLUME
XV LAIN-LAIN
7 Glasblock 7 Glasblock - bh
8 Floordrain 8 Floordrain - bh
DAFTAR HARGA MATERIAL DAN UPAH
HARGA
NO. JENIS MATERIAL SATUAN
SATUAN
1 Kayu 5/5x 3 m Kayu lokal btg Rp 40,000.00
2 Paku Ukuran Variasi kg Rp 22,000.00
3 Papan Cor 2/20 x 3 m lbr Err:509
4 Pasir Urug m3 Err:509
5 Portland Semen zak Err:509
6 Batu Belah m3 Err:509
7 Pasir Pasang m3 Err:509
8 Bata Merah bh Err:509
9 Split 2/3 m3 Err:509
10 Besi ø 10 mm btg Err:509
11 Besi ø 8 mm btg Err:509
12 Kawat beton kg Err:509
13 Kaca Bening 5 mm m2 Err:509
14 Kunci Slot bh Err:509
15 Engsel pintu bh Err:509
16 Engsel jendela bh Err:509
17 Genteng Plentong bh Err:509
18 Gypsum board lbr Err:509
19 Paku skrup bh Err:509
20 Paku Biasa 2" - 5" titik Err:509
21 Kayu Kruwing, balok 6/12 x 3 m btg Err:509
22 Besi Strip kg Err:509
23 Kait angin bh Err:509
24 Kaso 5/7, Kayu Tahun btg Err:509
25 GRC (0,8x20 cm) lbr Err:509
26 Kayu Kruwing Kaso 5/5 x 3 m btg Err:509
27 Reng Kruwing (2x3) cm btg Err:509
28 Kayu Kruwing , Balok 6/12 x 3 m btg Err:509
29 Keramik uk. 30 x 30 dus Err:509
30 Semen warna kg Err:509
31 Plamir kg Err:509
32 Cat Tembok kg Err:509
33 Cat Kayu kg Err:509
34 Cat menie kg Err:509
35 Kayu Kruwing, papan lbr Err:509
36 Kuas bh Err:509
37 Thinner klg Err:509
38 Ampelas bh Err:509
39 Stop Kontak bh Err:509
40 Lampu TL 18 Watt bh Err:509
41 Saklar Tungal bh Err:509
42 Saklar Double bh Err:509
43 Instalasi Listrik bh Err:509
44 Genteng bubung bh Err:509
45 Meja Guru bh Err:509
46 Kursi Guru bh Err:509
47 Almari Ruang Kelas bh Err:509
48 Rak Buku/Almari Loker bh Err:509
49 Papan Absen bh Err:509
50 Papan Tulis bh Err:509
51 Meja Siswa Tunggal bh Err:509
52 Kursi Siswa bh Err:509
53 Bambu btg Err:509
54 Lem Kayu kg Err:509
NO. UPAH PEKERJA SATUAN HARGA SATUAN
SOLEHUDIN, S.Pd.I
M. RAHMAT HIDAYAT NIP. 19761001 201212 1 001
MENGETAHUI : MENYETUJUI :
KEPALA SEKOLAH PENANGGUNGJAWAB TEKNIS
SD N TAMBAK PROGATEN
HARGA JUMLAH
NO. JENIS MATERIAL VOLUME SATUAN
SATUAN HARGA
1 Kayu 5/5x 3 m Kayu lokal 10 btg Rp 40,000.00 Rp 400,000.00
Paku Ukuran Variasi 1 kg Rp 22,000.00 Rp 22,000.00
Papan Cor 2/20 x 3 m 2 lbr Rp 50,000.00 Rp 100,000.00
Portland Semen 2 zak Rp 74,250.00 Rp 148,500.00
Pasir Pasang 1 m3 Rp 337,000.00 Rp 337,000.00
Split 2/3 1 m3 Rp 330,000.00 Rp 330,000.00
Baja Ringan + Galvalum (terpasang) 31 m2 Rp 575,000.00 Rp 17,825,000.00
JUMLAH A Rp 19,162,500.00
HARGA
NO. UPAH PEKERJA VOLUME SATUAN JUMLAH HARGA
SATUAN
1 Pekerja 3 HOK Rp 70,000.00 Rp 210,000.00
2 Tukang 1 HOK Rp 80,000.00 Rp 80,000.00
JUMLAH B Rp 290,000.00
HARGA
NO. JASA KONSULTAN VOLUME SATUAN JUMLAH HARGA
SATUAN
1 Jasa Konsultan RAB dan DED 1 Ls Rp 547,500.00 Rp 547,500.00
JUMLAH C Rp 547,500.00
JUMLAH TOTAL (A+B+C) Rp 20,000,000.00
PEMBULATAN Rp 20,000,000.00
KEBUTUHAN MATERIAL REHAB RUANG KELAS
#VALUE!
HARGA JUMLAH
NO. JENIS MATERIAL VOLUME SATUAN
SATUAN HARGA
1 Split 2/3 6 m3 Rp 330,000.00 Rp 1,980,000.00
2 Besi ø 10 mm 101 btg Rp 68,000.00 Rp 6,868,000.00
3 Besi ø 8 mm 55 btg Rp 54,000.00 Rp 2,970,000.00
4 Kawat beton 12 kg Rp 20,000.00 Rp 240,000.00
5 Kaca Bening 5 mm 5.7 m2 Rp 120,000.00 Rp 684,000.00
6 Kunci Slot 3 bh Rp 250,000.00 Rp 750,000.00
7 Engsel pintu 12 bh Rp 20,000.00 Rp 240,000.00
8 Engsel jendela 36 bh Rp 18,000.00 Rp 648,000.00
9 Genteng Plentong 2860 bh Rp 1,800.00 Rp 5,148,000.00
10 Gypsum board 38 lbr Rp 60,000.00 Rp 2,280,000.00
11 Besi Hollow 40x40x2 mm 108 btg Rp 40,000.00 Rp 4,320,000.00
12 Kayu Tahun, balok 6/12 x 3 m 27 btg Rp 180,000.00 Rp 4,860,000.00
13 Kait angin 18 bh Rp 15,000.00 Rp 270,000.00
14 Tempat Cucian Stainlees 1 lubang 1 bh Rp 400,000.00 Rp 400,000.00
15 Kayu Albasiah Kaso 5/5 x 3 m 190 btg Rp 30,000.00 Rp 5,700,000.00
16 Kayu Laban , Balok 6/12 x 3 m 24 btg Rp 240,000.00 Rp 5,760,000.00
17 Cat Tembok 82 kg Rp 25,000.00 Rp 2,050,000.00
18 Tee 3" 2 bh Rp 15,900.00 Rp 31,800.00
JUMLAH A Rp 45,199,800.00
0
0 DIBUAT OLEH :
0 TENAGA TEKNIS
0
0 M. RAHMAT HIDAYAT
KEBUTUHAN MATERIAL REHAB RUANG KELAS
TK KARTINI DESA BLENGORKULON KEC. AMBAL
(SUMBER DANA : BHR)
HARGA JUMLAH
NO. JENIS MATERIAL VOLUME SATUAN
SATUAN HARGA
1 Paku Ukuran Variasi 46 kg Rp 17,000.00 Rp 782,000.00
2 Portland Semen 2.00 zak Rp 62,000.00 Rp 124,000.00
3 Batu Belah 18 m3 Rp 246,000.00 Rp 4,428,000.00
4 Pasir Pasang 1.00 m3 Rp 220,000.00 Rp 220,000.00
5 Bata Merah 0 bh Rp 900.00 Rp -
6 Roster 22 bh Rp 9,000.00 Rp 198,000.00
7 Paku skrup 600 bh Rp 1,200.00 Rp 720,000.00
8 Accesories, las, dll 78 titik Rp 3,300.00 Rp 257,400.00
9 Plamir 29 kg Rp 25,000.00 Rp 725,000.00
10 Thinner 2 klg Rp 15,000.00 Rp 30,000.00
11 Ampelas 4 bh Rp 3,300.00 Rp 13,200.00
12 Stop Kontak 3 bh Rp 25,000.00 Rp 75,000.00
13 Saklar Tungal 2 bh Rp 20,000.00 Rp 40,000.00
14 Knee 1/2 " 1 bh Rp 15,000.00 Rp 15,000.00
15 Tee 2" 1 bh Rp 13,500.00 Rp 13,500.00
JUMLAH A Rp 7,641,100.00
0 M. RAHMAT HIDAYAT
KEBUTUHAN MATERIAL REHAB RUANG KELAS
TK KARTINI DESA BLENGORKULON KEC. AMBAL
0 M. RAHMAT HIDAYAT
PERHITUNGAN BACK UP DATA
3 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) 3 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
V = 0.05 x 3.50 x 4.50 0.79 m3
4 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) 4 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
V = 0.15 x 2.40 x 14.60 5.26 m3
5 Membuat 1 m3 plat beton atas beton bertulang (150 kg besi + bekisting) 5 Membuat 1 m3 plat beton atas beton bertulang (150 kg besi + bekisting) manhole
V = 0.15 x 3.30 x 4.30 - 0.64 2.03 m3
6 Membuat 1 m3 plat beton bawah bertulang (150 kg besi + bekisting) 6 Membuat 1 m3 plat beton bawah bertulang (150 kg besi + bekisting)
V = 0.20 x 3.50 x 4.50 3.15 m3
9 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat 9 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
L = 70.41 - 7.60 62.81 m3
3 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) 3 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
V = 0.05 x 2.50 x 3.50 0.44 m3
4 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) 4 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
V = 0.15 x 2.40 x 10.60 3.82 m3
5 Membuat 1 m3 plat beton atas beton bertulang (150 kg besi + bekisting) 5 Membuat 1 m3 plat beton atas beton bertulang (150 kg besi + bekisting) manhole
V = 0.15 x 2.30 x 3.30 - 0.64 1.04 m3
6 Membuat 1 m3 plat beton bawah bertulang (150 kg besi + bekisting) 6 Membuat 1 m3 plat beton bawah bertulang (150 kg besi + bekisting)
V = 0.20 x 2.50 x 3.50 1.75 m3
9 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat 9 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
L = 42.81 - 7.60 35.21 m3
II PEKERJAAN PASANGAN
1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) 1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
V = 0.10 x 0.65 x 0.65 0.04 m3
2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
L = 0.50 x 2.30 1.15 m2
3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. 3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.
L = 2 x 0.50 x 2.30 2.30 m2
1 Galian tanah / Pondasi batu kali 1 Galian tanah / Pondasi batu kali
V = 0.80 x 1.00 x 9.40 7.52 m3
1 Pemasangan 1m2 dinding bata Hebel (10x20x60)cm tebal ½ batu 1 Batu Kosong
V = 0.20 x 9.40 1.88 m3
3 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 3 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
L = 3 x 8.80 26.40 23.75 ###
kurangi 2.51 x 0.96 2.41
6 x 0.04 0.24
23.75
5 Plesteran 5 Plesteran
L dua kali plesteran 47.50 ###
2 Membuat 1 m’ kolom praktis beton bertulang (15 x 15) cm 2 Membuat 1 m’ kolom praktis beton bertulang (15 x 15) cm
P = 4.00 x 3.20 12.80 m'
3 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 3 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
P = 9.40 x 2.00 18.80 m'
5 Lisplang 5 Lisplang
P = 5.12 + 7.00 12.12 m'
6 Pemasangan roda pada pagar Tralis 6 Pemasangan roda pada pagar Tralis
L = 3.50 x 2.56 8.96 -
8 Pemasangan 1 buah kunci tanam biasa 8 Pemasangan 1 buah kunci tanam biasa 1.00 bh
9 Pemasangan 1 buah engsel pintu 9 Pemasangan 1 buah engsel pintu 3.00 bh
10 Err:509 10 Err:509 1.00 ###
1 Pengecatan 1 m2 tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat p 1 Cat kayu
L = sama dengan acian
47.50 m2
2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutu 2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
L = 0.28 x 4.92 = 1.38 m2
0.40 x 0.80 = 0.32 m2 4.90 m2
0.80 x 2.00 = 3.20 m2
VI Err:509
JUMLAH TOTAL
NO JENIS PEKERJAAN JUMLAH SATUAN HARGA SATUAN
: Disetujui
: Disetujui
Kepala Bidang Cipta Karya
Kepala Bidang Bina Teknik
Dinas Pekerjaan Umum
Dinas Pekerjaan Umum
Kabupaten Kebumen
Kabupaten Kebumen
SUPANGAT.ST
Ir. TRI MULYONO
NIP. 19650726 199203 1 006
NIP. 19630322 199603 1 003
: Mengetahui
Kepala Dinas Pekerjaan Umum
Kabupaten Kebumen
3 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) 3 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
V = 0.05 x 3.50 x 4.50 0.79 m3
4 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) 4 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
V = 0.15 x 2.40 x 14.60 5.26 m3
5 Membuat 1 m3 plat beton atas beton bertulang (150 kg besi + bekisting) 5 Membuat 1 m3 plat beton atas beton bertulang (150 kg besi + bekisting) manhole
1.10
V = 0.15 x 3.30 x 4.30 - 0.64 2.03 m3
6 Membuat 1 m3 plat beton bawah bertulang (150 kg besi + bekisting) 6 Membuat 1 m3 plat beton bawah bertulang (150 kg besi + bekisting)
V = 0.20 x 3.50 x 4.50 3.15 m3
9 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat 9 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
L = 70.41 - 7.60 62.81 m3
3 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) 3 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
V = 0.05 x 2.50 x 3.50 0.44 m3
4 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) 4 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
V = 0.15 x 2.40 x 10.60 3.82 m3
5 Membuat 1 m3 plat beton atas beton bertulang (150 kg besi + bekisting) 5 Membuat 1 m3 plat beton atas beton bertulang (150 kg besi + bekisting) manhole
V = 0.15 x 2.30 x 3.30 - 0.64 1.04 m3
6 Membuat 1 m3 plat beton bawah bertulang (150 kg besi + bekisting) 6 Membuat 1 m3 plat beton bawah bertulang (150 kg besi + bekisting)
V = 0.20 x 2.50 x 3.50 1.75 m3
9 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat 9 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
L = 42.81 - 7.60 35.21 m3
II PEKERJAAN PASANGAN
1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) 1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
V = 0.10 x 0.65 x 0.65 0.04 m3
2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 2 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
L = 0.50 x 2.30 1.15 m2
3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. 3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.
L = 2 x 0.50 x 2.30 2.30 m2
1 Galian tanah / Pondasi batu kali 1 Galian tanah / Pondasi batu kali
V = 0.80 x 1.00 x 9.40 7.52 m3
1 Pemasangan 1m2 dinding bata Hebel (10x20x60)cm tebal ½ batu 1 Batu Kosong
V = 0.20 x 9.40 1.88 m3
3 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 3 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
L = 3 x 8.80 26.40 23.75 #REF!
kurangi 2.51 x 0.96 2.41
6 x 0.04 0.24
23.75
5 Plesteran 5 Plesteran
L dua kali plesteran 47.50 #REF!
2 Membuat 1 m’ kolom praktis beton bertulang (15 x 15) cm 2 Membuat 1 m’ kolom praktis beton bertulang (15 x 15) cm
P = 4.00 x 3.20 12.80 m'
3 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 3 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
P = 9.40 x 2.00 18.80 m'
IV PEKERJAAN ALUMINIUM DAN BESI
1 Kusen Aluminium 1 Kusen Aluminium
V = 0.08 x 0.12 x 6.52 0.06 m3
5 Lisplang 5 Lisplang
P = 5.12 + 7.00 12.12 m'
6 Pemasangan roda pada pagar Tralis 6 Pemasangan roda pada pagar Tralis
L = 3.50 x 2.56 8.96 -
8 Pemasangan 1 buah kunci tanam biasa 8 Pemasangan 1 buah kunci tanam biasa 1.00 bh
9 Pemasangan 1 buah engsel pintu 9 Pemasangan 1 buah engsel pintu 3.00 bh
10 Err:509 10 Err:509 1.00 Err:509
1 Pengecatan 1 m2 tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat p 1 Cat kayu
L = sama dengan acian
47.50 m2
2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutu 2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
L = 0.28 x 4.92 = 1.38 m2
0.40 x 0.80 = 0.32 m2 4.90 m2
0.80 x 2.00 = 3.20 m2
VI Err:509
JUMLAH TOTAL
NO JENIS PEKERJAAN JUMLAH SATUAN HARGA SATUAN
Disetujui: Disetujui :
Kepala Bidang Cipta Karya Kepala Bidang Bina Teknik
Dinas Pekerjaan Umum Dinas Pekerjaan Umum
Kabupaten Keumen Kabupaten Kebumen
SUPANGAT,ST lr.TRIMULYONO
NIP:19650726 199203 1 006 NIP.19630322 199603 1 003
Mengetahui:
Kepala Dinas Pekerjaan Umum
Kabupaten Kebumen
H.SLAMET MUSTOLKHAH,ST.MT
NP:196950726 199203 1 006