RENCANA ANGGARAN BIAYA (RAB)

BANGUNAN KONSTRUKSI BAJA


PEMBANGUNAN MENARA PANDANG
KEGIATAN :
PEKERJAAN : PEMBANGUNAN MENARA PANDANG
LOKASI : DTW DELLENG SINDEKA SALAK
KABUPATEN : PAKPAK BHARAT

HARGA SATUAN TOTAL


NO. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.) HARGA (Rp.)

A PEKERJAAN PERSIAPAN
1 Brak / direksi keet 1.00 unit LS 500,000.00 500,000.00
2 Pemasangan Bowplank - LS 500,000.00 500,000.00
3 Papan Proyek 1.00 Ls 250,000.00 250,000.00
4 Pembuatan Laporan dan Dokumentasi 1.00 Ls 1,455,778.91 1,455,778.91
5 Mobilisasi alat 1.00 set LS 2,000,000.00 2,000,000.00
SUB JUMLAH A 4,705,778.91
B KESEHATAN DAN KESELAMATAN KERJA
1 SMK3 1 Analisa El - 119 5,350,000.00 5,350,000.00
SUB JUMLAH B 5,350,000.00
C PEKERJAAN KONSTRUKSI BAJA
I RANGKA BAJA I / WF
1 Kolom I / WF 400 x 200 x 7 x 11 4,075.20 kg Bs.2.a 31,110.00 126,779,472.00
Tinggi 6m
2 Rafter I / WF 300 x 150 x 5.5 x 8 3,989.76 kg Bs.2.a 31,110.00 124,121,433.60
Panjang 10.39 m
Konsul I / WF 300 x 150 x 5.5 x 8 526.08 kg Bs.2.a 31,110.00 16,366,348.80
3 Knee Connection, 1.5m 288.00 kg Bs.2.a 31,110.00 8,959,680.00
1/2 WF 300 x 150 x 5.5 x 8
4 Ridge Connection, 1,75m 168.00 kg Bs.2.a 31,110.00 5,226,480.00
1/2 WF 300 x 150 x 5.5 x 8 (puncak)
5 Pinned Base plate dudukan kolom 421.20 kg LS 15,000.00 6,318,000.00
500 x 300 tbl. 30 mm
6 Angkur untuk base plate f 25mm 183.69 kg LS 14,000.00 2,571,660.00
Panjang 100cm, mur M-24
7 Stiffener pengaku I / WF 353.81 kg LS 15,000.00 5,307,120.00
Tebal 10mm, jarak 1.5m, 2 sisi
8 End Plate pjg.600mm, lbr.150mm 101.09 kg LS 15,000.00 1,516,320.00
Pelat tebal 12mm
9 Baut untuk end plate f 19mm 49.68 kg LS 14,000.00 695,520.00
Baut M20 pjg.75mm+mur
10 Ridge Plate pjg.600mm, lbr.150mm 101.09 kg LS 15,000.00 1,516,320.00
(puncak kap) 2 sisi
11 Baut untuk Ridge Plate 16.56 kg LS 14,000.00 231,840.00
Baut M20 pjg.75mm+mur
12 Tulangan untuk menyambung 31.74 kg LS 14,000.00 444,382.85
dengan dinding bata f 12mm
13 Regel LS 10,000,000.00 10,000,000.00
2 C 125 + Tul. Diameter 12mm
SUB JUMLAH C-I 310,054,577.25
II GORDING / PURLIN C
1 Gording C 150 x 50 x 20 x 2.3 1,488.00 kg LS 15,000.00 22,320,000.00
Panjang 30m,
Jarak rata-rata 125cm
2 Siku penyangga Gording 41.31 kg LS 15,000.00 619,650.00
L 50 x 50 x 4 dan baut
SUB JUMLAH C-II 22,939,650.00
III ATAP
1 Atap Galvalum tebal 0.4mm 200.00 m2 LS 210,000.00 42,000,000.00
2 Nok Galvalum tebal 0.4mm 20.00 m' LS 200,000.00 4,000,000.00
3 Sagrod f 12mm, pjg. 1.3m 263.63 kg LS 14,000.00 3,690,846.43
4 Trekstang f 16mm, pjg. 6.2m 194.37 kg LS 14,000.00 2,721,159.17
(Rod bracing + turn buckle)
5 Lisplank Galvalum
Lembar Galvalum tbl. 0.4mm 23.00 m2 LS 210,000.00 4,830,000.00
6 Pengelasan, Pembautan, Finishing - LS 10,000,000.00 10,000,000.00
SUB JUMLAH C-III 67,242,005.60
SUB JUMLAH C 400,236,232.85
D PEKERJAAN NON KONSTRUKSI BAJA
I PEKERJAAN TANAH
1 Galian tanah 109.02 m3 Tn.2 90,900.00 9,909,918.00
2 Urugan tanah 27.26 m3 A.16+A.15 73,440.00 2,001,607.20
SUB JUMLAH D-I 11,911,525.20
II PEKERJAAN PONDASI
1 Urugan pasir pondasi 6.51 m3 Tn.11 133,380.00 867,903.66
2 Pek. Pondasi Batu Kali 1 : 3 : 10 37.80 m3 Pn.7 575,080.00 21,738,024.00
3 Pek. Pondasi footplate 10.64 m3 Bt.28 3,697,135.00 39,352,304.94
4 Pek. Sloof Pondasi 8.40 m3 Bt.29 4,520,650.00 37,973,460.00
5 Pek. Aaanstampeng Pondasi 8.40 m3 Pn.9 311,179.80 2,613,910.32
6 Pek. Beton rabat 0.86 m3 Bt.37 771,647.00 666,703.01
SUB JUMLAH D-II 103,212,305.93
III PEKERJAAN STRUKTUR BETON
1 Kolom (300 kg besi + bekisting) 4.64 m3 Bt.30 7,009,130.00 32,487,317.55
2 Balok beton bertulang 2.25 m3 Bt.31 5,442,940.00 12,246,615.00
3 Pelat lantai 60.00 m3 Bt.5 968,408.40 58,104,504.00
SUB JUMLAH D-III 102,838,436.55
V PENGECATAN
1 Cat Plat Besi 30.00 m2 Pc.14 17,371.50 521,145.00
SUB JUMLAH D-V 521,145.00
VI PEKERJAAN LISTRIK
1 Lampu Neon + box 10.00 ttk LS 120,000.00 1,200,000.00
2 Pasang stop kontak 5.00 bh. LS 50,000.00 250,000.00
3 Pasang saklar 5.00 bh. LS 50,000.00 250,000.00
5 Pasang sekring box 1.00 bh. LS 500,000.00 500,000.00
6 Pasang Daya Listrik 1.00 unit LS 1,000,000.00 1,000,000.00
7 Pembersihan lokasi - LS 500,000.00 500,000.00
SUB JUMLAH D-VI 3,700,000.00
SUB JUMLAH D 222,183,412.68

REKAPITULASI :
A PEKERJAAN PERSIAPAN 4,705,778.91
B KESEHATAN DAN KESELAMATAN KERJA 5,350,000.00
C PEKERJAAN KONSTRUKSI BAJA 400,236,232.85
D PEKERJAAN NON KONSTRUKSI BAJA 222,183,412.68
Jumlah 632,475,424.44
PPn 11% 69,572,296.69
Jumlah Total 702,047,721.13
Dibulatkan 702,000,000.00

Terbilang : ( Tujuh Ratus Dua Juta Rupiah )

Diketahui oleh :
Disetujui Oleh : Dibuat oleh :
Kepala Dinas Pekerjaan Umum, Tata Ruang dan
Pejabat Pembuat Komitmen (PPK) Kepala Bidang Pariwisata
Perhubungan

Drs. BAMABANG SUNARJO BANUREA ENDANG WAHYUDI BERUTU, ST


MARINGAN BANCIN, ST,MT
Nip : 19661222 1998011001 NIP. 19790106 200604 1012
NIP. 19720408 200212 1 007