Anda di halaman 1dari 227

DAFTAR HARGA DAN KUANTITAS

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN. ANGG. : 2021

NO. URAIAN UPAH / BAHAN

1 2

I SATUAN UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Besi
5 Tukang Cat
6 Tukang Kayu
7 Tukang Las
8 Pekerja

II BAHAN/MATERIAL
A BAHAN BATU/ PASIR/ TANAH/ KERIKIL
1 Pasir Pasang
2 Pasir Beton
2 Batu Kali (Bulat Utuh)
3 Kerekel Beton
4 Kerekel Timbunan/Sirtu
4 Pasir Timbunan/Urug
5 Tanah Timbunan/ Tanah Bunga
6 Split 0.5-1 Cm
7 Sirtu
8 Semen Portland (50 Kg/Zak) Type I setara Semen Padang
9 Tepung Apha AA (Semen Warna)
10 Batu Bata Merah (5 x 11 x 22)/SNI
11 Rooster R-11 Uk. 20x20x10 cm
12 Batu Andesit Polos Bakar Uk. 15x30X1.5 cm
13 Batu Alam W.K Cirebon Uk. 20x40x1,5 cm
14 Batu Pecah/ Lempeng
15 Homogeneous Tile Polished 60x60 , Merk Surface
16 Homogeneous Tile Un Polished 60x60, Merk Surface
17 Ceramic Tile Un Polished 40x40, Roman
18 Ceramic Tile Un Polished 30x30 ,Roman
19 Ceramic Tile Dinding Toilet 30x60 ,Merk Surface
20 Plint Granit 10 x 60 cm
21 Plint Granit 10 x 40 cm / Listello
22 Step Nosing Karet (4 cm x 2 cm)
23 Floor Hardener
24 Beton K-250 Ready Mix
25 Beton K-300 Ready Mix

B. BAHAN KAYU
1 Kayu (Papan Kls I) setara Banio
2 Kayu (Balok Kls I) setara Banio
3 Kayu (Papan Kls II) setara Marsawa
4 Kayu (Balok Kls II) setara Marsawa
5 Kayu (Papan Kls III) setara Merantih
6 Kayu (Balok Kls III) setara Merantih
7 Kayu Bekisting (Papan Kls IV)
8 Kayu Bekisting (Balok Kls IV)
9 Dolken Kayu Φ 8-10/300 cm
10 Triplek Tebal 6 mm (1200x2400 mm)
10 Plywood Tebal 9 mm
11 Plint Kayu, Tinggi 12 cm

C. BAHAN BESI
1 Besi Beton Standar SNI setara Krakatau Stell
2 Baja Profil IWF
3 Wiremesh M6-150
4 Wiremesh M8-150
5 Besi Strip/ Plat Gepeng (uk. 3/16" x 3/4" x 4 m)
6 Besi Checkered Plate
7 Besi Siku L 40.40.4
8 Besi Pelat Tebal 2 mm
9 Kawat Beton
10 Plat Smartdek, Garuda
11 Paku
12 Paku Beton 1"
13 Paku Sekrup
PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC
LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN. ANGG. : 2021

NO. URAIAN UPAH / BAHAN

1 2
14 Paku Atap
15 Skrup Fixer
16 Electroda/ Kawat Las
17 Formite/ Spacer
18 Hollow 20 x 40 Tebal 0.6 mm @ L=4 m'
19 Hollow 20 x 40 Tebal 2 mm @ L=4 m'
20 Hollow 40 x 40 Tebal 2.3 mm @ L=4 m' Stainlist
21 Hollow 40 x 40 Tebal 0.4 mm @ L=4 m'
22 Hollow 50 x 50 Tebal 2.0 mm @ L = 6 m Stainless Stell
23 Penggantung Plafond
24 Tangga Besi Galvanish (Shaft)
25 Railing Tangga Steiinlestell (Terpasang)
26 Pintu Besi Rangka Hollow Besi Lengkap Terpasang
27 Grill Penutup Saluran

D. BAHAN PLAFOND DAN PARTISI


1 Gypsum Board Tebal 9 mm (1200x2400 mm)
2 Gypsun Board Tebal 6 mm (1220x2440 mm)
3 Plafond PVC /Sunda Plafond
5 Lis Pinggir 20.20 @3m
6 Plat Hollow
7 Rod M5 Drat @ 1m
8 U Clamp Hollow 20x40
9 Angle Clip + Paku Mesiu
10 Skrup Gypsum
11 Compound @ 20 kg
12 Joint Tape
13 Maintee @ 3,6 m
14 Crosstee@1,2 m
15 Lis Wall Angle @3 m
16 Rod Kait/Tekuk @1 m
17 Clipper/Adjuster
18 Baja Canal Aluminium
E. BAHAN CAT
1 Cat Meni Kayu/Besi
2 Cat Dinding Ekterior, Jotashield
3 Cat Dinding Interior,Jotun Majestic
4 Cat Dasar (Kayu)
5 Cat Minyak, Platon
6 Cat Impra
7 Cat Dasar (Tembok)
8 Cat Duco Warna Metalik
9 Cat Batu Alam, Propan
10 Minyak Cat
11 Plammer Kayu
12 Plammur Tembok
13 Residu
14 Dompul
15 Epoxy Filler
16 Kuas
17 Thinner
18 Minyak Bekisting
19 Cat Aquaproof / Coating

F. BAHAN KAMUFLASE DINDING ALUMINIUM COMPOSITE PANEL


1 ACP PVDF 0.3 tb 4 mm ,Seven
2 Bracket Panel 19/19
3 Steel Bracket 50/50
4 Sealant
5 Sealant
6 Rivet
7 Drill
8 Screw
9 Bolt
10 Back Up Dia. 15 mm
11 Masking
12 Welding
13 Dynabolt
PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC
LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN. ANGG. : 2021

NO. URAIAN UPAH / BAHAN

1 2
14 Zinchromate

G. BAHAN SANITARY
1 Closet Duduk TOTO CW 421 J/CW 704 J
2 Closet Jongkok, TOTO CE9
3 Urinoir , TOTO U 57
4 Jet Washer, TOTO THX 20 White
5 Floor Drain, TOTO TX 1 BN
6 Washtafel, Toto LW 230 J Warna Putih
7 Hand Shower, Toto THX 19 B
8 Kran Air , TOTO Tipe T23 B13
9 Kran Dapur, TOTO TXX 609 K
10 Paper Holder, TOTO S 20
11 Towel Holder, TOTO TX 701 AEZ
12 Sekat Urinoir, TOTO A 100
13 Kitchen Sink Royal, Royal SB 1
14 Seal Tape
15 Waterdrain + Acsesories

H. BAHAN ACSESORIS PINTU/JENDELA


1 Frame Jendela Aluminium Color Coating 4”, Alexindo
2 Frame Kusen Aluminium Color Coating 3”, Alexindo
3 Daun Pintu Aluminium Anodized 4"
4 Daun Pintu Aluminium KM/ WC + Acsesories (Terpasang)
5 Kaca Buram Tebal 5 mm
6 Kaca Stopsol Reflektive ,One Way, tb 8 mm
7 Kaca Tempered Tebal 12 mm [clear]
8 Kaca Tempered Tebal 10 mm [clear]
9 Kaca BeningTebal 8 mm
10 Kaca Cermin Tebal 5 mm (153x122 cm)
11 Pull Handle Ex. Dekson [PH DL809 32X350 PSS]
12 Handle Dekkson LHTR 0016 22MM SSS
13 Folding Gate + Acsesories
14 Escutcheon Dekkson ESCN 84030 Oval SSS
15 Cylinder Dekkson CYL DC DL70MM SN
16 Mortise Lock DKS MTS IL DL84030 SSS
17 Hinge Dekkson ESS DL 4X3X2MM 2BB SSS
18 Friction Stay Dekkson FS S/S 8"
19 FFriction Stay Dekkson FS S/S 20"
20 Casement Handle Dekkson CH 425 R/H NA
21 Rel Pintu Geser
22 Karet Kaca
23 Sealant

I. BAHAN ATAP
1 Atap Spandek 0.4 mm, Rainbow Metal Deck
2 Nok / Bubungan,Spandeck, RMD
3 Flashing, Spandeck RMD
4 Sekrup (70xØ3,55 mm)
5 Paku (70xØ3,55 mm)
6 Aluminium Foil Metalizing Foil 2 sisi + PE Bubble, 4mm

J. BAHAN LANDSCAPING/ PLANTING


1 Air
2 Pupuk
3 Kanstein 40.20.10
4 Paving Block Warna Tebal 8 cm Type Hexagon K 250
5 Grass Block Tb 8 Cm, Model 8 Lubang, K-250
6 Pipa PVC Dia 1" setara Vinilion AW, Panjang 4 M'
7 Ampelas
8 Solar (umum)
9 Minyak Pelumas
10 Ijuk Saringan
11 Plastik Hitam

J. BAHAN ELEKTRIKAL

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN. ANGG. : 2021
NO. URAIAN UPAH / BAHAN

1 2
1 Kabel NYM 3 x 2.5 mm 2

2 PVC Hight Impact dia. 20 mm 2

3 Coupling / Socket dia. 20 mm 2

4 Clamp Cable dia. 20 mm 2

5 Junction Box
6 Kabel NYY 3 x 4 mm 2

7 Stop Kontak Schneider


8 Stop Kontak AC
9 Sakelar Tunggal Schneider
10 Sakelar Ganda Schneider
11 Inbow Dus
12 Lampu RC091V LED 356/840 PSU
13 Lampu DN027C LED20/CW23 W
14 Lampu 59494 MESON 125 13 W 65 K
15 Box Besi 80 x 60 3 Fhase
16 MCB 63 A 3 P 4,5 KA
17 MCB Type Domae 1 Pole 4 A 4,5 Ka
18 MCB Type Domae 1 Pole 6 A 4,5 Ka
19 MCB Type Domae 1 Pole 10 A 4,5 Ka
20 MCB Type Domae 1 Pole 16 A 4,5 Ka
21 Current Transformer Type CW-5L 5V 100/5A
22 Ampere Meter
23 Volt Meter
24 Accessories (Cu Bars, Support, Pentanahan, Cat, dll) Type Box
25 KWH Meter PLN 1 P
26 Material / Alat Bantu
K. BAHAN MEKANIKAL

1 Pipa PVC AW Ø 6”
2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 3"
4 Pipa PVC Rucika Ø 1"
5 Pipa PVC Rucika Ø 1/2"
6 Pompa Tranfer Air Bersih SANYO 250 Watt dan ACC
7 Fiber Tank Kap. 1100 Liter
8 Pipa GIP Ø 1"/32mm
9 Pipa GIP Ø 3/4"/25mm
10 Upah Pasang ME
11 Upah Pasang Pipa PVC 4 “- 6”
12 Upah Pasang Pipa PVC 1 “- 3”
13 Upah Pasang Pipa PVC 1/2 “- 1”
14 Upah Pasang Pipa GIP 1 “- 3”
L. SATUAN PERALATAN
1 Soda Api
2 Sabun

M. LAIN-LAIN
1 Over Head
2 Lem Kayu
3 Solar (Industri)
4 Alat Bantu Pekerjaan
5 Alat Bantu Peralatan

Padang,… /……/2021
Dibuat Oleh
PENAWAR
PT/CV……………………………
NAMA JELAS
DIREKTUR

ANALISA HARGA SATUAN PEKERJAAN [AHSP]


PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC
LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN

1 1 M' Pengukuran dan Pemasangan Bouwplank


Upah 0.1000 OH Tukang Kayu 0.0100 OH Kepala Tuk
0.1000 OH Pekerja
0.0050 OH Mandor
Bahan 0.0070 M³ Kayu Papan 3/20 0.0120 M³ Kayu
0.0200 Kg Paku
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

2 1 M² Pembersihan Lapangan
Upah 0.1000 OH Pekerja 0.0050 OH Mandor
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

B. ANALISA HARGA SATUAN PEKERJAAN TANAH

3 1 M3 Anal. Galian Tanah Biasa Sedalam 1 Meter


Upah 0.7500 OH Pekerja 0.0250 OH Mandor
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

4 1 M3 Anal. Galian Tanah Biasa Sedalam 2 Meter


Upah 0.9000 OH Pekerja 0.0450 OH Mandor
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
5 1 M3 Anal. Galian Tanah Biasa Sedalam 3 Meter
Upah 1.0500 OH Pekerja 0.0670 OH Mandor
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

6 1 M3 Urugan Kembali Padat (Galian Sedalam 1 Meter)


Upah 0.2500 OH Pekerja 0.0083 OH Mandor
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

7 1 M3 Anal. Urugan Tanah dipadatkan


Upah 0.3000 OH Pekerja 0.0100 OH Mandor
Bahan 1.2000 M³ Tanah Urug Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

8 1 M3 Anal. Urugan Tanah dengan Alat Berat


Upah 0.5667 OH Pekerja 0.1417 OH Mandor
Bahan 1.2000 M³ Tanah Urug 1.0000 Ls Alat Bantu
Jumlah
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan

9 1 M3 Anal. Urugan Pasir/ Tanah


Upah 0.3000 OH Pekerja 0.0100 OH Mandor
Bahan 1.2000 M³ Pasir Urug/ Tanah Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
10 1 M3 Anal. Urugan Sirtu Padat
Upah 0.2500 OH Pekerja 0.0250 OH Mandor
Bahan 1.2000 M³ Sirtu Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

11 1 M3 Anal. Pondasi Batu Kali 1 : 3


Upah 1.5000 OH Pekerja 0.0750 OH Mandor
0.7500 OH Tukang Batu
0.0750 OH Kepala Tukang
Bahan 1.2000 M3 Batu Kali
202.0000 Kg Semen Portland ( 50 Kg/Zak ) 0.4850 M3 Pasir Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

12 1 M3 Anal. Pondasi Batu Kali 1 : 4


Upah 1.5000 OH Pekerja 0.0750 OH Mandor
0.7500 OH Tukang Batu
0.0750 OH Kepala Tukang
Bahan 1.2000 M3 Batu Kali
163.00 Kg Semen Portland ( 50 Kg/Zak ) 0.5200 M3 Pasir Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
Overhead 0.1000
Total Harga Satuan Pekerjaan

13 1 M3 Anal. Aanstampang Batu Kali


Upah 0.7800 OH Pekerja 0.0390 OH Mandor
0.3900 OH Tukang Batu
0.0390 OH Kepala Tukang
Bahan 1.2000 M3 Batu Kali 0.4320 M3 Pasir Urug
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

D. ANALISA HARGA SATUAN PEKERJAAN BETON

14 1 M3 Anal. Stamp Beton K 100, f'c = 7,4 MPa (K100), Slump (12+2) CM, w/c=0.87
Upah 1.2000 OH Pekerja 0.0600 OH Mandor
0.2000 OH Tukang Batu
0.0200 OH Kepala Tukang
Bahan 230.00 Kg Sement Portland 0.6379 M3 Pasir B
0.7607 M3 Kerikil Beton (Maks. 30 mm)
200.00 Ltr Air
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
15 1 M3 Anal. Stamp Beton K 125, f'c = 9,8 MPa (K125), Slump (12+2) CM, w/c=0.78
Upah 1.6500 OH Pekerja 0.0830 OH Mandor
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang
Bahan 276.00 Kg Sement Portland 0.5914 M3 Pasir B
0.7496 M3 Kerikil Beton (Maks. 30 mm)
215.00 Ltr Air
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

16 1 M3 Anal. Stamp Beton K 175, fc' = 14,5 MPa, (K175), Slump (12+2) CM, w/c=0.66
Upah 1.6500 OH Pekerja 0.0830 OH Mandor
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang
Bahan 326.00 Kg Sement Portland 0.5429 M3 Pasir B
0.7622 M3 Kerikil Beton (Maks. 30 mm)
215.00 Ltr Air
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

17 1 M3 Anal. Stamp Beton K 225, fc' = 19,3 MPa (K225), Slump (12+2) CM, w/c=0.58
Upah 1.6500 OH Pekerja 0.0830 OH Mandor
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang
Bahan 371.00 Kg Sement Portland 0.4986 M3 Pasir B
0.7756 M3 Split (10-20 mm)
215.00 Ltr Air
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
Overhead 0.1000
Total Harga Satuan Pekerjaan

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2

18 1 M3 Anal. Stamp Beton K 250 (Site Mix) , fc' = 21,7 MPa (K250) Kedap Air, Slump (1
Upah 1.6500 OH Pekerja 0.0830 OH Mandor
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang
Bahan 384.00 Kg Sement Portland 0.4943 M3 Pasir B
0.7696 M3 Split (10-20 mm)
215.00 Ltr Air
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

19 1 M3 Anal. Stamp Beton K 300 (Site Mix) , fc' = 26,4 MPa (K300) Kedap Air, Slump (1
Upah 1.6500 OH Pekerja 0.0830 OH Mandor
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang
Bahan 413.00 Kg Sement Portland 0.4864 M3 Pasir B
0.7563 M3 Split (10-20 mm)
215.00 Ltr Air
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
20 1 M3 Anal. Pondasi Cyclopen 60% Beton 1 Pc : 3 Ps : 3 Kr + 40% Batu Belah
Upah 3.4000 OH Pekerja 0.1700 OH Mandor
0.0850 OH Tukang Batu
0.0850 OH Kepala Tukang

Bahan 194.00 Kg Sement Portland 0.3120 M3 Pasir Beton


0.4680 M3 Kerikil Beton
0.4800 Kg Batu Kali
35.0000 kg Besi Beton
1.8000 Kg Kawat Beton
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

21 10 Kg Anal. Pek. Pembesian


Upah 0.0700 OH Pekerja 0.0040 OH Mandor
0.0070 OH Kepala Tukang
0.0700 OH Tukang Besi
Bahan 10.5000 Kg Besi Beton 0.1500 Kg Kawat Beton
Jumlah
0.1000 Untuk 1 kg x 0.1
Overhead 0.1000
Total Harga Satuan Pekerjaan

22 10 Kg Anal. Pek. Jaring Kawat Baja (Wiremesh)


Upah 0.0250 OH Pekerja 0.0010 OH Mandor
0.0250 OH Kepala Tukang
0.0250 OH Tukang Besi
Bahan 10.2000 Kg Jaring Kawat Baja dilas 0.0500 Kg
Jumlah
0.1000 Untuk 1 kg x 0.1
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan
23 1 M2 Anal. Papan Bekisting Untuk Pondasi
Upah 0.5200 OH Pekerja 0.2600 OH Tukang Kayu
0.0260 OH Kepala Tukang
0.0260 OH Mandor
Bahan 0.0400 M3 Papan Kayu Bekisting Kelas III 0.3000
0.1000 Ltr Minyak Bekisting
Jumlah
0.5000 Untuk 2 x Pemakaian Bahan
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan

24 1 M2 Anal. Papan Bekisting Untuk Sloof


Upah 0.5200 OH Pekerja 0.2600 OH Tukang Kayu
0.0260 OH Kepala Tukang
0.0260 OH Mandor
Bahan 0.0450 M3 Papan Kayu Bekisting Kelas III 0.3000
0.1000 Ltr Minyak Bekisting
Jumlah
0.5000 Untuk 2 x Pemakaian Bahan

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan

25 1 M2 Anal. Bekisting Untuk Kolom


Upah 0.6600 OH Pekerja 0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang
0.0330 OH Mandor
Bahan 0.0400 M3 Papan Kayu Bekisting Kelas III 0.4000
0.2000 Ltr Minyak Bekisting
0.0150 M3 Balok Kayu Kelas III 0.3500 Lbr Plywood Tebal 9 mm
2.0000 Btg Dolken Kayu Galam (Ø 8-10) cm L = 4 m
Jumlah
0.5000 Untuk 2 x Pemakaian Bahan
Overhead 0.1000 Overhead
0.0330 OH Kepala Tukang
0.0330 OH Mandor
Bahan 0.0400 M3 Papan Kayu Bekisting Kelas III 0.4000
0.2000 Ltr Minyak Bekisting
0.0150 M3 Balok Kayu Kelas III 0.3500 Lbr Plywood Tebal 9 mm
2.0000 Btg Dolken Kayu Galam (Ø 8-10) cm L = 4 m
Jumlah
0.5000 Untuk 2 x Pemakaian Bahan
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan

26 1 M2 Anal. Bekisting Untuk Balok


Upah 0.6600 OH Pekerja 0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang
0.0330 OH Mandor
Bahan 0.0400 M3 Papan Kayu Bekisting Kelas III 0.4000
0.2000 Ltr Minyak Bekisting
0.0180 M3 Balok Kayu Kelas III 0.3500 Lbr Plywood Tebal 9 mm
2.0000 Btg Dolken Kayu Galam (Ø 8-10) cm L = 4 m
Jumlah
0.5000 Untuk 2 x Pemakaian Bahan
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan

27 1 M2 Anal. Bekisting Untuk Pelat Lantai


Upah 0.6600 OH Pekerja 0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang
0.0330 OH Mandor
Bahan 0.0400 M3 Papan Kayu Bekisting Kelas III 0.4000
0.2000 Ltr Minyak Bekisting
0.0150 M3 Balok Kayu Kelas III 0.3500 Lbr Plywood Tebal 9 mm
6.0000 Btg Dolken Kayu Galam (Ø 8-10) cm L = 4 m
Jumlah
0.5000 Untuk 2 x Pemakaian Bahan
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan
Total Harga Satuan Pekerjaan

28 1 M2 Anal. Bekisting Untuk Pelat Lantai , Floor Deck tb 0.7 mm


Upah 0.3300 OH Pekerja 0.1650 OH Tukang Kayu
0.0330 OH Kepala Tukang
0.0165 OH Mandor
Bahan
1.0500 M2 Floor Deck tb 0.7 mm
Jumlah
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan

29 1 M2 Anal. Bekisting Untuk Tangga


Upah 0.6600 OH Pekerja 0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang
0.0330 OH Mandor
Bahan 0.0300 M3 Papan Kayu Bekisting Kelas III 0.4000
0.1500 Ltr Minyak Bekisting
0.0150 M3 Balok Kayu Kelas III 0.3500 Lbr Plywood Tebal 9 mm
2.0000 Btg Dolken Kayu Galam (Ø 8-10) cm L = 4 m
Jumlah
0.5000 Untuk 2 x Pemakaian Bahan
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan

30 1 M1 Anal. Kolom Praktis Beton Bertulang Uk. 11x11 cm


Bahan 0.1800 OH Pekerja 0.0200 OH Tukang Kayu
0.0200 OH Tukang Batu
0.0200 OH Tukang Besi
0.0060 OH Kepala Tukang
0.0090 OH Mandor
0.0020 M2 Kayu Kls III
0.0100 Kg Paku
0.1500 Ltr Minyak Bekisting
3.0000 Kg Besi Beton
0.4500 Kg Kawat Beton
0.0100 Kg Paku
0.1500 Ltr Minyak Bekisting
3.0000 Kg Besi Beton
0.4500 Kg Kawat Beton

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
4.0000 Kg Semen Portland ( 50 Kg/Zak ) 0.0060 M3 Pasir Beton
0.0090 M3 Kerikil Beton
Jumlah
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan

31 1 M1 Anal. Balok Praktis Beton Bertulang Uk.10x15 cm


Upah 0.2970 OH Pekerja 0.0330 OH Tukang Kayu
0.0330 OH Tukang Batu
0.0330 OH Tukang Besi
0.0100 OH Kepala Tukang
0.0150 OH Mandor
Bahan 0.0030 M2 Kayu Kls III 0.0200 Kg Paku
0.2000 Ltr Minyak Bekisting
3.6000 Kg Besi Beton
0.0500 Kg Kawat Beton
5.5000 Kg Semen Portland ( 50 Kg/Zak ) 0.0090 M3 Pasir Beton
0.0150 M3 Kerikil Beton
Jumlah
Overhead 0.1000 Overhead
Total Harga Satuan Pekerjaan

E. ANALISA HARGA SATUAN PEKERJAAN DINDING DAN PLESTERAN


32 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 2
Upah 0.3000 OH Pekerja 0.0150 OH Mandor
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang
Bahan 70.0000 Bh Batu Bata 5x11x22
18.9500 Kg Semen Portland (50 Kg/Zak) 0.0380 M3 Pasir Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

33 1 M3 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 3


Upah 0.3000 OH Pekerja 0.0150 OH Mandor
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang
Bahan 70.0000 Bh Batu Bata
14.3700 Kg Semen Portland (50 Kg/Zak) 0.0400 M3 Pasir Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

34 1 M3 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 4


Upah 0.3000 OH Pekerja 0.0150 OH Mandor
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang
Bahan 70.0000 Bh Batu Bata
11.5000 Kg Semen Portland (50 Kg/Zak) 0.0430 M3 Pasir Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
35 1 M2 Anal. Memasang Dinding Terawang (Rooster) Uk. 20x20x10 cm Camp Spesi 1
Upah 0.3000 OH Pekerja 0.0150 OH Mandor
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang
Bahan 24.0000 Buah Rooster R-11 Uk. 20x20x10 cm 11.0000
Portland (50 Kg/Zak) 0.0350 M3 Pasir Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

36 1 M2 Anal. Plesteran 1 : 1 Tebal 15 mm (Afwerking Beton)


Upah 0.3000 OH Pekerja 0.0150 OH Mandor
0.1500 OH Tukang Batu
0.0150 OH Kepala Tukang
Bahan 15.5040 Kg Semen Portland (50 Kg/Zak) 0.0160 M
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

37 1 M2 Anal. Plesteran 1 : 2 Tebal 15 mm


Upah 0.3000 OH Pekerja 0.0150 OH Mandor
0.1500 OH Tukang Batu
0.0150 OH Kepala Tukang

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
Bahan 10.2240 Kg Semen Portland (50 Kg/Zak) 0.0200 M
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
Bahan 10.2240 Kg Semen Portland (50 Kg/Zak) 0.0200 M
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

38 1 M1 Anal. Opening Kusen /Skoning ,Plesteran 1 : 3 Tebal 15 mm


Upah 0.3000 OH Pekerja 0.0150 OH Mandor
0.1500 OH Tukang Batu
0.0150 OH Kepala Tukang
Bahan 7.7760 Kg Semen Portland (50 Kg/Zak) 0.0230 M
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

39 1 M2 Anal. Plesteran 1 : 4 Tebal 15 mm


Upah 0.3000 OH Pekerja 0.0150 OH Mandor
0.1500 OH Tukang Batu
0.0150 OH Kepala Tukang
Bahan 6.2400 Kg Semen Portland (50 Kg/Zak) 0.0240 M
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

40 1 M2 Anal. Plesteran Granit, 1 : 2 Granit, Tebal 10 cm


Upah 0.4500 OH Pekerja 0.0230 OH Mandor
0.2250 OH Tukang Batu
0.0230 OH Kepala Tukang
Bahan 10.0000 Kg Semen Portland (50 Kg/Zak) 15.0000
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
41 1 M2 Anal. Finishing Siar Pasangan Batu Kali Adukan 1 : 2
Upah 0.3000 OH Pekerja 0.0150 OH Mandor
0.1500 OH Tukang Batu
0.0150 OH Kepala Tukang
Bahan 6.3400 Kg Semen Portland (50 Kg/Zak) 0.0120 M
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

42 1 M2 Anal. Acian
Upah 0.2000 OH Pekerja 0.0100 OH Mandor
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang
Bahan 3.2500 Kg Semen Portland (50 Kg/Zak) Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

F. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

43 1 M2 Anal. Pasangan Homogeneous Tile Polished 60x60, Merk Surface


Upah 0.2500 OH Pekerja 0.0130 OH Mandor
0.1250 OH Tukang Batu
0.0130 OH Kepala Tukang
Bahan 2.7778 Buah Homogeneous Tile Polished 60x60 , Merk Su
Kg Semen Portland (50 Kg/Zak)
0.0450 M3 Pasir Pasang
1.3000 Kg Semen Warna/Tepung Apha
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
44 1 M2 Anal. Pasangan Homogeneous Tile Un Polished 60x60 , Merk Surface
Upah 0.2500 OH Pekerja 0.0130 OH Mandor
0.1250 OH Tukang Batu
0.0130 OH Kepala Tukang
Bahan 2.7778 Buah Homogeneous Tile Un Polished 60x60, Merk
Kg Semen Portland (50 Kg/Zak)
0.0450 M3 Pasir Pasang
1.3000 Kg Semen Warna/Tepung Apha
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

45 1 M2 Anal. Pas. Ceramic Tile Un Polished 40x40


Upah 0.7000 OH Pekerja 0.0350 OH Mandor

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang
Bahan 6.2500 Buah Keramik Un Polished 40x40 8.1900 K
Portland (50 Kg/Zak) 0.0450 M3 Pasir Pasang
1.6200 M3 Semen Warna/Tepung Apha
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
46 1 M2 Anal. Pas. Dinding Granite Toilet 30x60 cm , Merk Surface
Upah 0.9000 OH Pekerja 0.0450 OH Mandor
0.4500 OH Tukang Batu
0.0450 OH Kepala Tukang
Bahan 5.5556 Buah Granite 30x60 cm
9.3000 Kg Semen Portland (50 Kg/Zak) 0.0180 M3 Pasir Pasang
1.9400 Kg Semen Warna/Tepung Apha
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

47 1 M' Anal. Plint Granit Uk. 10 x 60 cm


Upah 0.0900 OH Pekerja 0.0050 OH Mandor
0.0900 OH Tukang Batu
0.0090 OH Kepala Tukang
Bahan 1.6667 Buah Plint Granit 10 x 60
1.1400 Kg Semen Portland (50 Kg/Zak) 0.0030 M3 Pasir Pasang
0.1000 M3 Semen Warna/Tepung Apha
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

48 1 M' Anal. Listello Uk. 10 x 40 cm


Upah 0.0900 OH Pekerja 0.0050 OH Mandor
0.0900 OH Tukang Batu
0.0090 OH Kepala Tukang
Bahan 2.5000 Buah Listello 10 x 40
1.1400 Kg Semen Portland (50 Kg/Zak) 0.0030 M3 Pasir Pasang
0.1000 M3 Semen Warna/Tepung Apha
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
Overhead 0.1000
Total Harga Satuan Pekerjaan

49 1 M2 Anal. Memasang Batu Andesit Polos Bakar Uk. 15 x 30 x 1.5 cm


Upah 0.7000 OH Pekerja 0.0350 OH Mandor
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang
Bahan 1.1000 M2 Batu Andesit Polos Uk. 15x30x1,5 cm 11.750
Semen Portland (50 Kg/Zak)
0.0350 M3 Pasir Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

50 1 M2 Anal. Memasang Batu Alam W.K Cirebon Uk. 20x40x1,5 cm


Upah 0.7000 OH Pekerja 0.0350 OH Mandor
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang
Bahan 1.1000 M2 Batu Alam W.K Cirebon Uk. 20x40x1,5 cm 11
Semen Portland (50 Kg/Zak)
0.0350 M3 Pasir Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

51 1 M2 Anal. Memasang Batu Pecah/ Lempeng


Upah 0.7000 OH Pekerja 0.0350 OH Mandor
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang
Bahan 1.1000 Buah Batu Pecah/ Lempeng 11.7500 Kg
Kg/Zak) 0.0350 M3 Pasir Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
Overhead 0.1000
Total Harga Satuan Pekerjaan

52 1 M' Anal. Stair Nosing Granit 10x60 cm


Upah 0.0900 OH Pekerja 0.0050 OH Mandor
0.0900 OH Tukang Batu
0.0090 OH Kepala Tukang

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
Bahan 1.6667 Buah Stair Nosing Granit 10x60 cm 1.1400
Portland (50 Kg/Zak) 0.0030 M3 Pasir Pasang
0.1000 M3 Semen Warna/Tepung Apha
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

53 1 M2 Anal. Pekerjaan Waterproofing Coating (Toilet Area)


Upah 0.0550 OH Pekerja 0.0150 OH Mandor
1.1000 M2 Waterproofing Coating
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

54 1 M2 Anal. Pekerjaan Waterproofing Coating (Dak Beton)


Upah 0.0550 OH Pekerja 0.0150 OH Mandor
1.1000 M2 Waterproofing Coating 1.0000 M2 Screed
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
1.1000 M2 Waterproofing Coating 1.0000 M2 Screed
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

55 1 M2 Anal. Pasangan Floor Hardener


Upah 0.1200 OH Pekerja 0.1200 OH Tukang Batu
0.0060 OH Mandor
0.0120 OH Kepala Tukang
Bahan 5.0000 Kg Floor Hardener Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

G. ANALISA HARGA SATUAN PEKERJAAN KAYU

56 1 M3 Anal. Pembuatan dan Pemasangan Kusen Pintu dan Kusen Jendela, Kayu Kela
Upah 7.0000 OH Pekerja 21.0000 OH Tukang Kayu
2.1000 OH Kepala Tukang
0.3500 OH Mandor
Bahan 1.1000 M3 Balok Kayu 1.2500 Kg Paku 10 cm
1.0000 Kg Lem Kayu
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

57 1 M2 Anal. Pembuatan dan Pemasangan Daun Pintu Panel, Kayu Kelas I


Upah 1.0000 OH Pekerja 3.0000 OH Tukang Kayu
0.3000 OH Kepala Tukang
0.0500 OH Mandor
Bahan 0.0400 M3 Papan Kayu 0.5000 Kg Lem Kayu
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
Overhead 0.1000
Total Harga Satuan Pekerjaan

H. ANALISA HARGA SATUAN PEKERJAAN LANGIT-LANGIT DAN PARTISI

58 1 M2 Pemasangan Plafond Gypsum Board Uk. 1200x2400x9 mm Jarak 60x60 cm


Upah 0.4500 OH Pekerja 0.4000 OH Tukang Kayu
0.0400 OH Kepala Tukang
0.0230 OH Mandor
Bahan 0.6900 Btg Hollow 20x40x0,06 @4m 0.4600 Btg H
@4m 0.5000 M' Lis Pinggir 20.20
3.1000 Bh Plat Hollow
0.7000 M' Rod M5 Drat @ 1m 0.7000 Bh U Clamp Hollow 20x40 0.7
Angle Clip + Paku Mesiu 0.3470 Lbr Gypsum Board tb 9 mm 25.0000 Pc
0.0300 Zak Compound @ 20 kg
0.0300 Ktk PB 1"
0.0300 M' Joint Tape
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

59 1 M2 Pemasangan Plafond PVC /Sunda Plafond


Upah 0.4500 OH Pekerja 0.4000 OH Tukang Kayu
0.0400 OH Kepala Tukang
0.0230 OH Mandor
Bahan 0.2310 Btg Maintee @ 3,6 m 1.3900 Btg Crosstee@
PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC
LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
0.2000 Btg Lis Wall Angle @3 m 1.3900 M' Rod Kait/Tekuk @1 m
1.3900 Bh Clipper/Adjuster
1.3900 Kg Paku, Mesiu + Angle Clep 0.0300 Kg Paku Beton 1"
1.3900 M2 PVC Sunda Plafond
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

60 1 M' Anal. Pek. Memasang List Plafond Gypsum


Upah 0.0030 OH Mandor 0.0060 OH Kepala Tukang
0.0600 OH Tukang Kayu
0.0600 OH Pekerja
Bahan 1.0500 m' List Plafond Gypsum 0.0100 Kg Paku
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

61 1 M2 Pemasangan Dinding Partisi Gypsun Board Tebal 6 mm


Upah 0.1500 OH Pekerja 0.4500 OH Tukang Kayu
0.0450 OH Kepala Tukang
0.0080 OH Mandor
Bahan 0.8340 Lbr Gypsun Board Tebal 6 mm 0.3000 Kg
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

62 1 M2 Anal. Memasang Rangka Partisi Baja Canal Aluminium


Upah 0.3000 OH Tukang
0.0300 OH Kepala Tukang
0.2000 OH Pekerja
0.0100 OH Mandor
Bahan 5.5000 M' Baja Canal Aluminium 0.1000 Kg P
1 M2 Anal. Memasang Rangka Partisi Baja Canal Aluminium
Upah 0.3000 OH Tukang
0.0300 OH Kepala Tukang
0.2000 OH Pekerja
0.0100 OH Mandor
Bahan 5.5000 M' Baja Canal Aluminium 0.1000 Kg P
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

I. ANALISA HARGA SATUAN PEKERJAAN PENGECATAN

63 1 M2 Anal. Mencat Kayu Baru 1 x Plamir + 1 x Dasar + 3 Lap. Cat Penutup


Upah 0.0025 OH Mandor 0.0040 OH Kepala Tukang
0.1050 OH Tukang cat
0.0700 OH Pekerja
Bahan 0.2000 Kg Cat Meni 0.1500 Kg Plamur Kayu
0.1700 Kg Cat Dasar
0.3500 Kg Cat Minyak 3x ex. Platon

0.1000 Overhead

64 1 M2 Anal. Mencat Tembok Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 2 Lap. Cat Pe
Upah 0.0030 OH Mandor 0.0063 OH Kepala Tukang
0.0630 OH Tukang cat
0.0200 OH Pekerja
Bahan 0.1200 Kg Epoxy Filler 0.1000 Kg Cat Dasar
0.2600 Kg Cat Dinding Ekterior, Jotashield
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

65 1 M2 Anal. Mencat Tembok Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 2 Lap. Cat Pe
Upah 0.0030 OH Mandor 0.0063 OH Kepala Tukang
0.0630 OH Tukang cat
0.0200 OH Pekerja
Bahan 0.1200 Kg Epoxy Filler 0.1000 Kg Cat Dasar
0.2600 Kg Cat Dinding Interior,Jotun Majestic
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

66 1 M2 Anal. Pengecatan Permukaan Baja Galvanish Secara Semprot Sistem 3 Lapis C


Upah 0.0200 OH Mandor 0.0700 OH Kepala Tukang
0.7000 OH Tukang cat
0.4000 OH Pekerja
Bahan 0.3000 Kg Cat Duco Warna Metalik 0.0100 Ltr

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

67 1 M2 Anal. Pengecatan Permukaan Batu Alam 2 Lapis


Upah 0.0030 OH Mandor 0.0063 OH Kepala Tukang
0.0630 OH Tukang cat
0.0200 OH Pekerja
Bahan 0.2000 Ltr Cat Batu Alam 2x setara Propan 0.0100
Jumlah
Overhead + Profi 0.1000
Total Harga Satuan Pekerjaan
Overhead + Profi 0.1000
Total Harga Satuan Pekerjaan

J. ANALISA HARGA SATUAN PEKERJAAN BESI, ALUMINIUM, PINTU/ JENDELA

68 1 Kg Anal. Pemasangan Besi Baja Profil


Upah 0.0600 OH Pekerja
0.0600 OH Tukang Las Konstruksi 0.0060 OH Kepala Tukang
0.0030 OH Mandor
Bahan 1.1500 Kg Besi Profil Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

69 Anal. Pasangan Daun Pintu Besi Plat Tebal 2 mm Rangkap, Rangka Baja Siku/ M2
Bahan 1.0500 OH Pekerja 1.0500 OH Tukang Besi
0.1050 OH Kepala Tukang
0.0520 OH Mandor
15.0000 Kg Besi Siku L 30.30.3
1.1000 M2 Besi Plat Baja Tebal 2 mm 0.0500 Kg Kawat Las
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

70 1 cm Anal. Pengelasan dengan Las Listrik


Upah 0.0002 OH Mandor 0.0002 OH Kepala Tukang
0.0020 OH Tukang Besi
0.0040 OH Pekerja
Bahan 0.0400 Kg Kawat Listrik 0.0300 Liter Solar
0.0040 Liter Minyak Pelumas
Alat 0.0170 Jam Sewa Alat Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
Total Harga Satuan Pekerjaan

71 1 M2 Anal. Pemasangan Pintu Foolding Gate


Upah 1.2000 OH Pekerja 1.2000 OH Tukang Las
0.1200 OH Kepala Tukang
0.0060 OH Mandor
Bahan 1.0000 M2 Pintu Folding Gate Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

72 1 M' Anal. Memasang Kusen Aluminium 3" Powder Coating [ex. Alexindo]
Upah 0.0430 OH Pekerja
0.0430 OH Tukang Khusus Aluminium 0.0043 OH Kepala Tukang
0.0021 OH Mandor
Bahan 1.1000 M' Aluminium 3" Powder Coating 2.0000 B
0.0600 Tube Sealant
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

73 1 M' Anal. Memasang Frame Jendela Color Anodized [ex. Alexindo]


Upah 0.0430 OH Pekerja 0.0430 OH Tukang Besi
0.0043 OH Kepala Tukang
0.0021 OH Mandor
Bahan 1.1000 M' Aluminium 4" Powder Coating 2.0000 B
0.0600 Tube Sealant
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
74 1 M2 Anal. Memasang Terali Besi Strip 20x3 mm
Upah 1.6700 OH Pekerja 1.6700 OH Tukang Las
0.1670 OH Kepala Tukang

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
0.0830 OH Mandor
Bahan 6.1770 Kg Besi Strip 27.0800 cm Pengelasan
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

75 Anal. Pasang Pegangan Pintu [Pull Handle Ex.Dekson / Buah]


Upah 0.0600 OH Pekerja
0.6000 OH Tukang Besi/ Aluminium 0.0600 OH Kepala Tukang
0.0030 OH Mandor
Bahan 1.0000 Bh Pull Handle Ex. Dekson [PH DL809 32X350 P
Overhead 0.1000
Total Harga Satuan Pekerjaan

76 Anal. Pemasangan Pegangan Pintu {Ex. Dekson / Buah]


Upah 0.0600 OH Pekerja
0.6000 OH Tukang Besi/ Aluminium 0.0600 OH Kepala Tukang
0.0030 OH Mandor
Bahan 1.0000 Bh Handle Dekkson LHTR 0016 22MM SSS Jum
Overhead 0.1000
Total Harga Satuan Pekerjaan
Bahan 1.0000 Bh Handle Dekkson LHTR 0016 22MM SSS Jum
Overhead 0.1000
Total Harga Satuan Pekerjaan

77 Anal. Pemasangan Pegangan Jendela {Ex. Dekson / Buah]


Upah 0.0600 OH Pekerja
0.6000 OH Tukang Besi/ Aluminium 0.0600 OH Kepala Tukang
0.0030 OH Mandor
Bahan 1.0000 Bh Casement Handle Dekkson CH 425 R/H NA J
Overhead 0.1000
Total Harga Satuan Pekerjaan

78 Anal. Pasang Escutcheon [Ex. Dekson/ Buah]


Upah 0.0050 OH Pekerja
0.5000 OH Tukang Besi/ Aluminium 0.0500 OH Kepala Tukang
0.0030 OH Mandor
Bahan 1.0000 Bh Escutcheon Dekkson ESCN 84030 Oval SSS
Overhead 0.1000
Total Harga Satuan Pekerjaan

79 Anal. Pasang Double Cylinder setara Ex. Dekson/ Buah


Upah 0.0050 OH Pekerja
0.5000 OH Tukang Besi/ Aluminium 0.0500 OH Kepala Tukang
0.0030 OH Mandor
Bahan 1.0000 Bh Cylinder Dekkson CYL DC DL70MM SN Jum
Overhead 0.1000
Total Harga Satuan Pekerjaan
80 Anal. Pasang Roller Lockcase setara LC102WL-40 Solid / Buah
Upah 0.0050 OH Pekerja
0.5000 OH Tukang Besi/ Aluminium 0.0500 OH Kepala Tukang
Bahan 0.0030 OH Mandor
1.0000 Bh Roller Lockcase setara LC102WL-40 Solid
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

81 Anal. Pasang Engsel Pintu / Buah


Upah 0.0150 OH Pekerja
0.1500 OH Tukang Besi/ Aluminium 0.0150 OH Kepala Tukang
0.0008 OH Mandor
Bahan 1.0000 Bh Hinge Dekkson ESS DL 4X3X2MM 2BB SSS
Overhead 0.1000
Total Harga Satuan Pekerjaan

82 Anal. Pasang Engsel Casement 8 “/ Buah


Upah 0.1000 OH Pekerja
0.2000 OH Tukang Besi/ Aluminium 0.0200 OH Kepala Tukang
0.0005 OH Mandor
Bahan 1.0000 Psg Friction Stay Dekkson FS S/S 8" Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

83 Anal. Pasang Engsel Casement 20 “/ Buah


Upah 0.0150 OH Pekerja
0.1500 OH Tukang Besi/ Aluminium
PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC
LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
0.0150 OH Kepala Tukang
0.0080 OH Mandor
Bahan 1.0000 Psg FFriction Stay Dekkson FS S/S 20" Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

84 1 M2 Anal. Pasang Kaca Stopsol Reflektif ,One Way, Tebal 8 mm


Upah 0.0170 OH Pekerja 0.1700 OH Tukang Kayu
0.0170 OH Kepala Tukang
0.0009 OH Mandor
Bahan 1.1000 M2 Kaca Stopsol Reflektive ,One Way, tb 8 mm 2
Rangka Frame Aluminium 3"
0.0700 Kg Sealant
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

85 1 M2 Anal. Pasang Kaca Tempered Tebal 10 mm. Merk Asahimas


Upah 0.0170 OH Pekerja 0.1700 OH Tukang
0.0170 OH Kepala Tukang
0.0009 OH Mandor
Bahan 1.1000 M2 Kaca Tempered Tebal 10 mm [clear] 2.0000
Rangka Frame Aluminium 3" 1.0000 Ls Asesories (mur, baut, dynabolt dll) 0.07
Sealant
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

86 1 M2 Anal. Pasang Kaca Tempered Tebal 12 mm. Merk Asahimas


Upah 0.0170 OH Pekerja 0.1700 OH Tukang
0.0170 OH Kepala Tukang
0.0009 OH Mandor
Bahan 1.1000 M2 Kaca Tempered Tebal 12 mm [clear] 2.0000
1 M2 Anal. Pasang Kaca Tempered Tebal 12 mm. Merk Asahimas
Upah 0.0170 OH Pekerja 0.1700 OH Tukang
0.0170 OH Kepala Tukang
0.0009 OH Mandor
Bahan 1.1000 M2 Kaca Tempered Tebal 12 mm [clear] 2.0000
Rangka Frame Aluminium 3" 1.0000 Ls Asesories (mur, baut, dynabolt dll) 0.07
Sealant
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

87 1 M2 Anal. Pasang Kaca Bening Tebal 8 mm


Upah 0.0170 OH Pekerja 0.1700 OH Tukang
0.0170 OH Kepala Tukang
0.0009 OH Mandor
Bahan 1.1000 M2 Kaca Bening Tebal 8 mm 0.0700 Kg
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

88 1 M2 Anal. Pasang Kaca Cermin Tebal 5 mm


Upah 0.0150 OH Pekerja 0.1500 OH Tukang Besi
0.0150 OH Kepala Tukang
0.0080 OH Mandor
Bahan 1.1000 M2 Kaca Cermin Tebal 5 mm Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
89 Anal. Pasangan Framelless Pintu Utama / Unit
3.7800 M2 Kaca T. Stopsol Asahi tb 12 mm 1.0000 M2 Lapis Sticker Sandblast
5.00 M' Karet Kaca + Sealant
2.0000 Set Patch Fitting DKS Paket (PT10,PT20,US10+Cyl) 4.0000 Bh Patch Fitting
2.0000 Set Floor Hinge Dekkson FH 84 BD SSS

2.0000 Psg Pull Handle Stainless steel H = 100


Mortise Lock Dekkson MTS RL DL84030 SSS

Total Harga Satuan Pekerjaan

90 Anal. Pasangan Jendela Type JA.1 AC/ Unit


Bahan 6.50 M' Rangka AlumInium 3 " AC 2.6400 M2 Kaca Bening
13.00 M' Karet Kaca + Sealant
Total Harga Satuan Pekerjaan

91 Anal. Pasangan Jendela Type J1.3 AC/ Unit


Bahan 16.08 M' Rangka AlumInium 3 " AC 2.7200 M2 Kaca Bening
13.00 M' Karet Kaca + Sealant
1.30 M2 Kisi-kisi Aluminium

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
2.0000 bh Casement Handle Dekkson CH 425 R/H NA 2.0000 Psg Engsel Casement
Total Harga Satuan Pekerjaan
92 Anal. Pasangan Jendela Type J1.4 AC/ Unit
Bahan 21.38 M' Rangka AlumInium 3 " AC 6.2400 M' Frame Jend
Asc 3.5040 M2 Kaca Bening tb 8 mm
27.62 M' Karet Kaca + Sealant
1.30 M2 Kisi-kisi Aluminium
2.0000 bh Casement Handle Dekkson CH 425 R/H NA 2.0000 Psg Engsel Casement
Total Harga Satuan Pekerjaan

93 Anal. Pasangan Jendela Type JA2 AC/ Unit


Bahan 11.15 M' Rangka AlumInium 3 " AC 4.9000 M2 Kaca Bening
22.30 M' Karet Kaca + Sealant
Total Harga Satuan Pekerjaan

94 Anal. Pasangan Jendela Type JA3 AC/ Unit


Bahan 7.50 M' Rangka AlumInium 3 " AC 3.2550 M2 Kaca Bening
15.00 M' Karet Kaca + Sealant
Total Harga Satuan Pekerjaan

95 Anal. Pasangan Jendela Type BV-1/ Unit


Bahan 0.40 M' Rangka Aluminium 3 " AC 0.6400 M' Frame Kaca
M2 Kaca Bening tb 8 mm
2.00 M' Karet Kaca + Sealant
1.0000 bh Casement Handle Dekkson CH 425 R/H NA 2.0000 bh Engsel Casement
Total Harga Satuan Pekerjaan

96 Anal. Pasangan Jendela Type BV-2/ Unit


Bahan 0.80 M' Rangka Aluminium 3 " AC 1.2800 M' Frame Kaca
M2 Kaca Bening tb 8 mm
4.00 M' Karet Kaca + Sealant
2.0000 bh Casement Handle Dekkson CH 425 R/H NA 4.0000 bh Engsel Casement
Total Harga Satuan Pekerjaan
97 Anal. Pasangan Jendela Type PA-01/ Unit
Bahan 6.70 M' Rangka Aluminium 3 " AC 7.0900 M' Frame Kaca
M2 Kaca Bening tb 8 mm
1.89 M2 Panel HPL
5.70 M' Karet Kaca + Sealant
1.0000 Set Handle Dekkson LHTR 0016 22MM SSS 3.0000 bh Engsel Pintu 4 " Deks
Total Harga Satuan Pekerjaan

98 Anal. Pasangan Jendela Type PA-02/ Unit


Bahan 6.60 M' Rangka Aluminium 3 " AC 6.9200 M' Frame Kaca
M2 Kaca Bening tb 8 mm
1.68 M2 Panel HPL
5.70 M' Karet Kaca + Sealant
1.0000 Set Handle Dekkson LHTR 0016 22MM SSS 3.0000 bh Engsel Pintu 4 " Deks
Total Harga Satuan Pekerjaan

99 Anal. Pasangan Jendela Type PA-03/ Unit


Bahan 6.30 M' Rangka AlumInium 3 " AC 1.5750 M2 Frame Panel
2.0000 bh Engsel Pintu 4 " Dekson
Total Harga Satuan Pekerjaan

100 Anal. Pasangan Pintu Type PD-01/ Unit


Bahan 9.25 M' Rangka AlumInium 3 " AC 7.5500 M' Frame Kaca
M2 Kaca Bening tb 8 mm
5.70 M' Karet Kaca + Sealant
1.0000 Set Floor Hinge Dekkson FH 84 BD SSS 1.0000 Set Double cyclender
1.0000 set Escutcheon
2.0000 Set Handle Dekkson LHTR 0016 22MM SSS 6.0000 bh Engsel Pintu 4 " Deks
Total Harga Satuan Pekerjaan
101 Anal. Pasangan Pintu PD-02/ Unit
Bahan 9.25 M' Rangka AlumInium 3 " AC 7.5500 M' Frame Kaca
M2 Kaca Bening tb 8 mm
2.00 Bh Panel HPL+ R.multipleks 12 MM
5.70 M' Karet Kaca + Sealant 1.0000 Set Double cyclender 1.0000 set Escutcheon

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
2.0000 Set Handle Dekkson LHTR 0016 22MM SSS 6.0000 bh Engsel Pintu 4 " Deks
Total Harga Satuan Pekerjaan

102 Anal. Pasangan Pintu Jendela Type PJ1-AC/ Unit


Bahan 13.10 M' Rangka AlumInium 3 " AC 4.0000 M' Frame Kaca
M' Frame Pintu Kaca 4 " AC+ Asc 0.3200 M2 Kaca Buram tb 8 mm
5.70 M' Karet Kaca + Sealant
1.0000 Set Handle Dekkson LHTR 0016 22MM SSS 1.0000 Set Double cyclender
1.0000 Set Escutcheon
6.0000 bh Engsel Pintu 4 " Dekson
Total Harga Satuan Pekerjaan

103 Anal. Pasangan Pintu Jendela Type PJ2-AC/ Unit


Bahan 16.60 M' Rangka AlumInium 3 " AC 4.0000 M' Frame Kaca
M' Frame Pintu Kaca 4 " AC+ Asc 0.3200 M2 Kaca Bening tb 8 mm
5.70 M' Karet Kaca + Sealant
1.0000 Set Handle Dekkson LHTR 0016 22MM SSS 1.0000 Set Double cyclender
1.0000 Set Escutcheon
6.0000 bh Engsel Pintu 4 " Dekson
Total Harga Satuan Pekerjaan
1.0000 Set Escutcheon
6.0000 bh Engsel Pintu 4 " Dekson
Total Harga Satuan Pekerjaan

104 Anal. Pasangan Jendela Kisi-Kisi/Singok Type KS-AC/ Unit


Bahan 15.80 M' Rangka AlumInium 3 " AC 5.6000 M2 Kisi-kisi Alum
Total Harga Satuan Pekerjaan

105 1 M2 Anal. Pekerjaan Supply dan Pemasangan Aluminium Composite Panel ex. Sev
Bracket Panel/Bh
0.0196 Bracket Panel 19/19
2.0000 Rivet
4.0000 Drill
2.0000 Screw

Hollow Aluminium 40 x 40 x 0,6 mm/M'


1.0000 M' Hollow Aluminium 40 x 40 x 0,6 mm
1.0000 Zinchromate
4.0000 Welding
4.0000 Drill
4.0000 Screw

Steel Bracket/Set
2.0000 Steel Bracket 50/50
2.0000 Dyna Bolt M10
8.0000 Drill
2.0000 Bolt

Sealant/M'
1.1000 Sealant
1.0000 Back Up Dia. 15 mm
2.0000 Masking
Pekerjaan Supply dan Pemasangan ACP/M2
1.2000 M2 Aluminium Composite Panel Tb 4 mm 12.0000 Bh Bracke
2.0000 M' Hollow Aluminium 40 x 40 x 0.6 mm Galvanis 1.0000 Set S
2.0000 M' Sealant
1.0000 ls alat Bantu
Jumlah
Upah Pasang
Transportasi 0.2000
Overhead 0.1000

Total Harga Satuan Pekerjaan


106 1 M2 Anal. Pekerjaan Supply dan Pemasangan Ornamen ACP + Cutting Laser Pek. Su
Pemasangan ACP/ M2
1.0000 M2 Aluminium Composite Panel Tb 4 mm 4.0000 Bh Bracket Pan
3.0000 M' Hollow 40 x 40 Tebal 0.6 mm @ L=4 m'
3.0000 M' Sealant
1.0000 M2 Cutting Laser
1.0000 ls Alat Bantu
Jumlah
Upah Pasang
Transportasi 0.1000
Overhead 0.1000

Total Harga Satuan Pekerjaan

K. ANALISA HARGA SATUAN PEKERJAAN FINISHING TANGGA

107 Anal. Pek.Finishing Tangga Type 1/ Unit


Bahan 15.5625 M2 Afwerking Bidang Beton 15.5625 M2
Tembok [Interior]

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN


1 2
17.3625 M2 Pas. Granite Tile Hmg. Unpolish
28.98 M' Step Noshing
15.0000 M' Pas. Railling Tangga Besi +Cat Duco
Total Harga Satuan Pekerjaan

L. ANALISA HARGA SATUAN PEKERJAAN SANITARY

108 Anal. Memasang Closet Duduk setara TOTO CW 421 J / Buah


Upah 0.1600 OH Mandor 0.0100 OH Kepala Tukang
1.1000 OH Tukang Batu
3.3000 OH Pekerja
Bahan 1.0000 Unit Closet Duduk TOTO CW 421 J/CW 704 J 0.0
Perlengkapan
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

109 Anal. Memasang Closet Jongkok setara TOTO CE9 / Buah


Upah 0.1600 OH Mandor 0.1500 OH Kepala Tukang
1.5000 OH Tukang Batu
1.0000 OH Pekerja
Bahan 1.0000 Unit Closet Jongkok, TOTO CE9 6.0000 K
Portland (50 Kg) 0.0100 M3 Pasir Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
110 Anal. Memasang Urinoir setara TOTO U 57 / Buah
0.0500 OH Mandor
0.1000 OH Kepala Tukang
1.0000 OH Tukang Batu
1.0000 OH Pekerja
1.0000 Bh Urinoir , TOTO U 57 6.0000 Kg Semen Portland (50 Kg) 0.010
Pasang
0.3000 Hrg Urinoir Perlengkapan
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

110 Anal. Memasang Jet Washer setara TOTO THX 20 White / Buah
Upah 0.0050 OH Mandor 0.0100 OH Kepala Tukang
0.1000 OH Tukang Batu
0.0100 OH Pekerja
Bahan 1.0000 Unit Jet Washer, TOTO THX 20 White Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

111 Anal. Memasang Washtafel setara Toto LW 230 J Warna Putih / Buah
Upah 0.0600 OH Mandor 0.1500 OH Kepala Tukang
1.4500 OH Tukang Batu
1.2000 OH Pekerja
Bahan 1.2000 Unit Washtafel, Toto LW 230 J Warna Putih 6.000
Semen Portland (50 Kg)
0.0100 M3 Pasir Pasang 0.1200 Hrg Wastafel Perlengkapan
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
112 Anal. Memasang Hand Shower setara Toto THX 19 B / Buah
Upah 0.0050 OH Mandor 0.0100 OH Kepala Tukang
0.1000 OH Tukang Batu
0.0100 OH Pekerja
Bahan 1.0000 Bh Hand Shower, Toto THX 19 B Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

113 Anal. Memasang Kitchen Sink Royal setara Royal SB 1/ Buah


Upah 0.0150 OH Mandor 0.0300 OH Kepala Tukang
0.3000 OH Tukang Batu
0.0300 OH Pekerja
Bahan 1.0000 Unit Kitchen Sink Royal, Royal SB 1 1.0000
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

114 Anal. Memasang Floor Drain setara TOTO TX 1 BN / Buah


Upah 0.0050 OH Mandor 0.0100 OH Kepala Tukang

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
0.1000 OH Tukang Batu
0.0100 OH Pekerja
Bahan 1.0000 Unit Floor Drain setara TOTO TX 1 BN Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
0.1000 OH Tukang Batu
0.0100 OH Pekerja
Bahan 1.0000 Unit Floor Drain setara TOTO TX 1 BN Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

115 Anal. Memasang Kran Air setara TOTO Tipe T23 B13 / Buah
Upah 0.0050 OH Mandor 0.0400 OH Kepala Tukang
0.4000 OH Tukang Batu
0.0100 OH Pekerja
Bahan 1.0000 Bh Kran Air setara TOTO Tipe T23 B13 0.0250
Tape
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

116 Anal. Memasang Kran Dapur setara TOTO TXX 609 K / Buah
Upah 0.0050 OH Mandor 0.0400 OH Kepala Tukang
0.4000 OH Tukang Batu
0.0100 OH Pekerja
Bahan 1.0000 Bh Kran Dapur setara TOTO TXX 609 K 0.0250
Tape
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

117 Anal. Memasang Paper Holder setara TOTO S 20 / Buah


Upah 0.0100 OH Kepala Tukang 1.1000 OH Tukang B
Bahan 1.0000 Bh Paper Holder setara TOTO S 20 Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

118 Anal. Memasang Towel Holder setara TOTO TX 701 AEZ / Buah
Upah 0.0100 OH Kepala Tukang 1.1000 OH Tukang B
Bahan 1.0000 Bh Towel Holder setara TOTO TX 701 AEZ Jum
Overhead 0.1000
Upah 0.0100 OH Kepala Tukang 1.1000 OH Tukang B
Bahan 1.0000 Bh Towel Holder setara TOTO TX 701 AEZ Jum
Overhead 0.1000

Total Harga Satuan Pekerjaan

119 Anal. Memasang Sekat Urinoir setara TOTO A 100/ Buah


0.0500 OH Mandor
0.1000 OH Kepala Tukang
1.0000 OH Tukang Batu
1.0000 OH Pekerja
Bahan 1.0000 Bh Sekat Urinoir setara TOTO A 100 6.0000
Portland (50 Kg)
0.0100 M3 Pasir Pasang 0.1000 Hrg Sekat Perlengkapan
Jumlah
Overhead 0.1000

Total Harga Satuan Pekerjaan

120 1 Unit Anal. Meja Wastafel Tebal 8 cm Uk. 65x 180


Bahan
0.2113 M3 Anl. Stamp Beton K175 110.0000 Kg Anl. Besi U24
1.3825 M2 Anl. Keramik 20x40
Total Harga Satuan Pekerjaan

121 1 Unit Anal. Meja Pantry Tebal 10 cm , Uk 65x 300


Bahan
0.2860 M3 Anl. Stamp Beton K175 110.0000 Kg Anl. Besi U24
2.2500 M2 Anl. Keramik 20x40
Total Harga Satuan Pekerjaan

M. ANALISA HARGA SATUAN PEKERJAAN ATAP

122 1 M2 Anal. Memasang Atap Spandeck TB 0,4 mm, RMD CB G550,AZ 150
Upah 0.0100 OH Mandor 0.0030 OH Kepala Tukang
0.3000 OH Tukang
0.2000 OH Pekerja
Bahan 1.0500 M1 Atap Spandek 0.4 mm, Rainbow Metal Deck
Hexagonal Safe Top
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
0.3000 OH Tukang
0.2000 OH Pekerja
Bahan 1.0500 M1 Atap Spandek 0.4 mm, Rainbow Metal Deck
Hexagonal Safe Top
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

123 1 M' Anal. Memasang Nok/Bubungan, Spandeck


Upah 0.0060 OH Mandor 0.0250 OH Kepala Tukang
0.2500 OH Tukang

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
0.1250 OH Pekerja
2.0000 M' Nok / Bubungan,Spandeck, RMD 11.0000 Pcs Paku
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

124 1 M' Anal. Flashing, Spandeck


Upah 0.0060 OH Mandor 0.0250 OH Kepala Tukang
0.2500 OH Tukang
0.1250 OH Pekerja
1.0000 M' Flashing, Spandeck RMD 11.0000 Pcs Paku
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
125 1 M' Anal. Listplank GRC Board, Lebar 30 cm, Tebal 9 mm
Upah 0.2000 OH Tukang Kayu 0.0200 OH Kepala Tuk
0.1000 OH Pekerja
0.0050 OH Mandor
Bahan 0.0110 M2 Listplank GRC Board Tebal 9 mm 0.0500
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

126 1 M2 Anal. Memasang Aluminium Foil


Upah 0.0100 OH Mandor 0.0200 OH Kepala Tukang
0.0200 OH Tukang
0.2000 OH Pekerja
Bahan 1.1000 M2 Aluminium Foil
8.0000 Bh
Sekrup Hexagonal Safe Top
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

N. ANALISA HARGA SATUAN PEKERJAAN LANDSCAPE

127 Anal. Pemasangan Paving Block Warna Tebal 8 cm Type Hexagon K-250 / M2
Upah 0.2500 OH Pekerja 0.0500 OH Tukang Batu
0.0250 OH Kepala Tukang
0.0030 OH Mandor
Bahan 0.2000 m³ Pasir Urug
25.0000 Bh Paving Block Tebal 8 cm Type Hexagon
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan
128 Anal. Pemasangan Grass Block, Tebal 8 cm Type 8 Lubang, K-250 / M2
Upah 0.2500 OH Pekerja 0.0500 OH Tukang Batu
0.0250 OH Kepala Tukang
0.0030 OH Mandor
Bahan 0.2000 M Pasir Urug
3

7.5000 Bh Grass Block Tb 8 Cm, Model 8 Lubang, K-250


Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

129 1 M' Anal. Pemasangan Kanstein Uk. 40.20.10


Upah 0.1500 OH Pekerja 0.0500 OH Tukang Batu
0.0250 OH Mandor
Bahan 0.0250 OH Pasir Pasang 3.3000 Kg Portlant C
4.0000 Bh Kanstein Uk. 40.20.10
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

130 1 M' Anal. Memasang Grill Penutup Saluran


Upah 0.0600 Tukang Batu 0.0360 Pekerja
Bahan 1.1000 m' Grill Penutup Saluran 1.0000 Alat
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

ANALISA SATUAN PEKERJAAN STRUKTUR


PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC
LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN. ANGG. : 2021
NO. URAIAN ITEM PEKERJAN

1 2

O. ANALISA HARGA SATUAN PEKERJAAN STRUKTUR


P. ANALISA HARGA SATUAN PEKERJAAN ELERKTRIKAL DAN MEKANIKAL
131 Pas. Instalasi Titik Lampu
8.0000 m' Kabel NYM 3 x 2.5 mm 2

8.0000 m' PVC Hight Impact dia. 20 mm 2

2.0000 bh Coupling / Socket dia. 20 mm 2

4.0000 bh Clamp Cable dia. 20 mm 2

1.0000 bh Junction Box


1.0000 ls Material / Alat Bantu
1.0000 lot Upah Pasang ME
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

132 Pas. Instalasi Titik Stop Kontak


8.0000 m' Kabel NYM 3 x 2.5 mm 2

8.0000 m' PVC Hight Impact dia. 20 mm 2

2.0000 bh Coupling / Socket dia. 20 mm 2

4.0000 bh Clamp Cable dia. 20 mm 2

1.0000 bh Junction Box


1.0000 ls Material / Alat Bantu
1.0000 lot Upah Pasang ME
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

133 1 M1 Pas. Kabel NYY 3 x 4 mm²


1.0000 m' Kabel NYY 3 x 4 mm2
1.0000 ls Material / Alat Bantu
1.0000 lot Upah Pasang ME
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

134 1 bh Pas. Stop Kontak Schneider


1.0000 unit Stop Kontak Inbow
1.0000 unit Inbow Dus
1.0000 lot Upah Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

135 1 bh Pas. Stop Kontak AC + Fan Schneider


1.0000 unit Stop Kontak AC inbow
1.0000 unit Inbow Dus
1.0000 lot Upah Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

136 1 bh Pas. Sakelar Tunggal Schneider


1.0000 unit Sakelar Tunggal Schneider
1.0000 unit Inbow Dus
1.0000 lot Upah Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

137 1 bh Pas. Sakelar Ganda Schneider


1.0000 unit Sakelar Ganda Schneider
1.0000 unit Inbow Dus
1.0000 lot Upah Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

138 Panel SDP


1.0000 unit Box Besi 80 x 60 3 Fhase
2.0000 bh MCB 63 A 3 P 4,5 kA
40.0000 bh MCB Type Domae 1 Pole 4 A 4,5 kA
1.0000 bh MCB Type Domae 1 Pole 6 A 4,5 kA
1.0000 bh MCB Type Domae 1 Pole 10 A 4,5 kA
4.0000 bh MCB Type Domae 1 Pole 16 A 4,5 kA
3.0000 bh
Current Transformer Type CW-5L 5V 100/5A
1.0000 bh
Ampere Meter
1.0000 bh
Volt Meter
3.0000 bh
Indicator Lamp
1.0000 ls
Accessories (Cu Bars, Support, Pentanahan
* Type Box
1.0000 ls Material / Alat Bantu
1.0000 lot Upah Pasang
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

139 1 M1 Pipa PVC Class AW Ø 6”


1.0000 m'
Pipa Ø 6”

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN. ANGG. : 2021

NO. URAIAN ITEM PEKERJAN

1 2
1.0000 lot
Accessories ( hanger,support dll)
1.0000 ls Material Bantu
1.0000 lot Upah Pasang Pipa PVC 4 “- 6”
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

140 1 M1 Pipa PVC Class AW Ø 4”


1.0000 m'
Pipa Ø 4”
1.0000 lot
Accessories ( hanger,support dll)
1.0000 ls Material Bantu
1.0000 lot Upah Pasang Pipa PVC 4 “- 6”
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

141 1 M1 Pipa PVC Class AW Ø 3”


1.0000 m'
Pipa Ø 3”
1.0000 lot
Accessories ( hanger,support dll)
1.0000 ls Material Bantu
1.0000 lot Upah Pasang Pipa PVC 1 “- 3”
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

142 1 M1 Pipa PVC Rucika Ø 1”


1.0000 m'
Pipa PVC Rucika Ø 1"
1.0000 lot
Accessories ( hanger,support dll)
1.0000 ls Material Bantu
1.0000 lot Upah Pasang Pipa PVC 1/2 “- 1”
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

143 1 M1 Pipa PVC Rucika Ø 1/2”


1.0000 m'
Pipa PVC Rucika Ø 1/2"
1.0000 lot
Accessories ( hanger,support dll)
1.0000 ls Material Bantu
1.0000 lot Upah Pasang Pipa PVC 1/2 “- 1”
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

144 1 M1 Pipa GIP Ø 1”/32 mm


1.0000 m'
Pipa GIP Ø 1"/32mm
1.0000 lot
Accessories ( hanger,support dll)
1.0000 ls Material Bantu
1.0000 lot Upah Pasang Pipa GIP 1 “- 3”
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

145 1 M1 Pipa GIP Ø 3/4”/25 mm


1.0000 m'
Pipa GIP Ø 3/4"/25mm
1.0000 lot
Accessories ( hanger,support dll)
1.0000 ls Material Bantu
1.0000 lot Upah Pasang Pipa GIP 1 “- 3”
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

146 AC Wall Mounted 2PK


1.0000 unit AC Wall Mounted 2PK
1.0000 lot Accessories ( hanger,support,cat dll)
1.0000 ls Material Bantu
1.0000 lot Upah Pasang ME
Jumlah
Overhead 0.1000
Total Harga Satuan Pekerjaan

DAFTAR HARGA SATUAN PEKERJAAN


PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC
LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN SATUAN ITEM PEKERJAAN

1 2

A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN

1 1 M' Pengukuran dan Pemasangan Bouwplank


2 1 M² Pembersihan Lapangan

B. ANALISA HARGA SATUAN PEKERJAAN TANAH

2 1 M3 Anal. Galian Tanah Biasa Sedalam 1 Meter


3 1 M3 Urugan Kembali Padat (Galian Sedalam 1 Meter)
4 1 M3 Anal. Urugan Tanah dengan Alat Berat
5 1 M3 Anal. Urugan Pasir/ Tanah

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

1 1 M3 Anal. Pondasi Batu Kali 1:3


2 1 M3 Anal. Pondasi Batu Kali 1:4
3 1 M3 Anal. Aanstampang Batu Kali

D. ANALISA HARGA SATUAN PEKERJAAN BETON

1 1 M3 Anal. Stamp Beton K 125, f'c = 9,8 MPa (K125), Slump (12+2) CM, w/c=0.78
2 1 M3 Anal. Stamp Beton K 175, fc' = 14,5 MPa, (K175), Slump (12+2) CM, w/c=0.66
3 1 M3 Anal. Stamp Beton K 225, fc' = 19,3 MPa (K225), Slump (12+2) CM, w/c=0.58
4 1 M3 Anal. Stamp Beton K 250 (Site Mix) , fc' = 21,7 MPa (K250) Kedap Air, Slump (12+2) CM, w/c
5 1 M3 Anal. Stamp Beton K 300 (Site Mix) , fc' = 26,4 MPa (K300) Kedap Air, Slump (12+2) CM, w/c
6 1 M3 Anal. Stamp Beton K 250 (Site Mix) , fc' = 21,7 MPa (K250) Kedap Air, Slump (12+2) CM, w/c
7 1 M3 Anal. Stamp Beton K 300 (Site Mix) , fc' = 26,4 MPa (K300) Kedap Air, Slump (12+2) CM, w/c
8 10 Kg Anal. Pek. Pembesian
9 1 M2 Anal. Papan Bekisting Untuk Sloof
10 1 M2 Anal. Bekisting Untuk Kolom
11 1 M2 Anal. Bekisting Untuk Balok
12 1 M2 Anal. Bekisting Untuk Pelat Lantai , Floor Deck tb 0.7 mm
13 1 M2 Anal. Bekisting Untuk Tangga
14 1 M1 Anal. Kolom Praktis Beton Bertulang Uk. 11x11 cm
15 1 M1 Anal. Balok Praktis Beton Bertulang Uk.10x15 cm
16

E. ANALISA HARGA SATUAN PEKERJAAN DINDING DAN PLESTERAN

1 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 2


2 1 M3 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 3
3 1 M3 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 4
4 1 M2 Anal. Memasang Dinding Terawang (Rooster) Uk. 20x20x10 cm Camp Spesi 1 : 3
5 1 M2 Anal. Plesteran 1 : 1 Tebal 15 mm (Afwerking Beton)
6 1 M2 Anal. Plesteran 1 : 2 Tebal 15 mm
7 1 M1 Anal. Opening Kusen /Skoning ,Plesteran 1 : 3 Tebal 15 mm
8 1 M2 Anal. Plesteran 1 : 4 Tebal 15 mm
9 1 M2 Anal. Plesteran Granit, 1 : 2 Granit, Tebal 10 cm
10 1 M2 Anal. Finishing Siar Pasangan Batu Kali Adukan 1 : 2
11 1 M2 Anal. Acian

F. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

1 1 M2 Anal. Pasangan Homogeneous Tile Polished 60x60, Merk Surface


2 1 M2 Anal. Pasangan Homogeneous Tile Un Polished 60x60 , Merk Surface
3 1 M2 Anal. Pas. Ceramic Tile Un Polished 40x40
4 1 M' Anal. Plint Granit Uk. 10 x 60 cm
5 1 M' Anal. Listello Uk. 10 x 40 cm
6 1 M2 Anal. Pas. Dinding Granite Toilet 30x60 cm , Merk Surface
7 1 M2 Anal. Memasang Batu Andesit Polos Bakar Uk. 15 x 30 x 1.5 cm
8 1 M2 Anal. Memasang Batu Alam W.K Cirebon Uk. 20x40x1,5 cm
9 1 M' Anal. Stair Nosing Granit 10x60 cm
10 1 M2 Anal. Pekerjaan Waterproofing Coating (Toilet Area)
11 1 M2 Anal. Pekerjaan Waterproofing Coating (Dak Beton)
12 1 M2 Anal. Pasangan Floor Hardener

H. ANALISA HARGA SATUAN PEKERJAAN LANGIT-LANGIT DAN PARTISI

1 1 M2 Pemasangan Plafond Gypsum Board Uk. 1200x2400x9 mm Jarak 60x60 cm


2 1 M' Anal. Pek. Memasang List Plafond Gypsum
3 1 M2 Pemasangan Dinding Partisi Gypsun Board Tebal 6 mm
4 1 M2 Anal. Memasang Rangka Partisi Baja Canal Aluminium
5 1 M2 Pemasangan Plafond PVC /Sunda Plafond

I. ANALISA HARGA SATUAN PEKERJAAN PENGECATAN

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN SATUAN ITEM PEKERJAAN

1 2
1 1 M2 Anal. Mencat Tembok Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 2 Lap. Cat Penutup [Exte
2 1 M2 Anal. Mencat Tembok Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 2 Lap. Cat Penutup [Interi
3 1 M2 Anal. Mencat Kayu Baru 1 x Plamir + 1 x Dasar + 3 Lap. Cat Penutup
4 1 M2 Anal. Pengecatan Permukaan Baja Galvanish Secara Semprot Sistem 3 Lapis Cat

J. ANALISA HARGA SATUAN PEKERJAAN BESI, ALUMINIUM, PINTU/ JENDELA

1 1 Kg Anal. Pemasangan Besi Baja Profil


2 Anal. Pasangan Daun Pintu Besi Plat Tebal 2 mm Rangkap, Rangka Baja Siku/ M2
3 1 cm Anal. Pengelasan dengan Las Listrik
4 1 M2 Anal. Pemasangan Pintu Foolding Gate
5 1 M' Anal. Memasang Kusen Aluminium 3" Powder Coating [ex. Alexindo]
6 1 M' Anal. Memasang Frame Jendela Color Anodized [ex. Alexindo]
7 1 M2 Anal. Memasang Terali Besi Strip 20x3 mm
8 Anal. Pasang Pegangan Pintu [Pull Handle Ex.Dekson / Buah]
9 Anal. Pemasangan Pegangan Pintu {Ex. Dekson / Buah]
10 Anal. Pasang Escutcheon [Ex. Dekson/ Buah]
11 Anal. Pasang Double Cylinder setara Ex. Dekson/ Buah
12 Anal. Pasang Roller Lockcase setara LC102WL-40 Solid / Buah
13 Anal. Pasang Engsel Pintu / Buah
14 Anal. Pasang Engsel Casement 8 “/ Buah
15 Anal. Pasang Engsel Casement 20 “/ Buah
16 1 M2 Anal. Pasang Kaca Stopsol Reflektif ,One Way, Tebal 8 mm
17 1 M2 Anal. Pasang Kaca Tempered Tebal 12 mm. Merk Asahimas
18 1 M2 Anal. Pasang Kaca Bening Tebal 8 mm
19 1 M2 Anal. Pasang Kaca Cermin Tebal 5 mm
20 Anal. Pasangan Pintu Type PD-01/ Unit
21 Anal. Pasangan Jendela Type JA.1 AC/ Unit
22 Anal. Pasangan Jendela Type JA2 AC/ Unit
23 Anal. Pasangan Jendela Type JA3 AC/ Unit
24 Anal. Pasangan Jendela Type J1.3 AC/ Unit
25 Anal. Pasangan Jendela Type J1.4 AC/ Unit
26 Anal. Pasangan Jendela Type JA2 AC/ Unit
27 Anal. Pasangan Jendela Type JA3 AC/ Unit
28 Anal. Pasangan Jendela Type BV-1/ Unit
29 Anal. Pasangan Jendela Type PA-03/ Unit
30 1 M2 Anal. Pekerjaan Supply dan Pemasangan Aluminium Composite Panel ex. Sevent
31 1 M2 Anal. Pekerjaan Supply dan Pemasangan Ornamen ACP + Cutting Laser

K. ANALISA HARGA SATUAN PEKERJAAN FINISHING TANGGA

1 Anal. Pek.Finishing Tangga Type 1/ Unit

L. ANALISA HARGA SATUAN PEKERJAAN SANITARY

1 Anal. Memasang Closet Duduk setara TOTO CW 421 J / Buah


2 Anal. Memasang Closet Jongkok setara TOTO CE9 / Buah
3 Anal. Memasang Urinoir setara TOTO U 57 / Buah
4 Anal. Memasang Jet Washer setara TOTO THX 20 White / Buah
5 Anal. Memasang Washtafel setara Toto LW 230 J Warna Putih / Buah
6 Anal. Memasang Hand Shower setara Toto THX 19 B / Buah
7 Anal. Memasang Kitchen Sink Royal setara Royal SB 1/ Buah
8 Anal. Memasang Floor Drain setara TOTO TX 1 BN / Buah
9 Anal. Memasang Kran Air setara TOTO Tipe T23 B13 / Buah
10 Anal. Memasang Kran Dapur setara TOTO TXX 609 K / Buah
11 Anal. Memasang Paper Holder setara TOTO S 20 / Buah
12 Anal. Memasang Towel Holder setara TOTO TX 701 AEZ / Buah
13 Anal. Memasang Sekat Urinoir setara TOTO A 100/ Buah
14 1 Unit Anal. Meja Wastafel Tebal 8 cm Uk. 65x 180
15 1 Unit Anal. Meja Pantry Tebal 10 cm , Uk 65x 300

M. ANALISA HARGA SATUAN PEKERJAAN ATAP

1 1 M2 Anal. Memasang Atap Spandeck TB 0,4 mm, RMD CB G550,AZ 150


2 1 M' Anal. Memasang Nok/Bubungan, Spandeck
3 1 M' Anal. Flashing, Spandeck
4 1 M' Anal. Listplank GRC Board, Lebar 30 cm, Tebal 9 mm

N. ANALISA HARGA SATUAN PEKERJAAN LANDSCAPE

1 Anal. Pemasangan Paving Block Warna Tebal 8 cm Type Hexagon K-250 / M2


2 1 M' Anal. Pemasangan Kanstein Uk. 40.20.10
3 1 M' Anal. Memasang Grill Penutup Saluran

O. ANALISA HARGA SATUAN PEKERJAAN STRUKTUR


P. ANALISA HARGA SATUAN PEKERJAAN ELERKTRIKAL DAN MEKANIKAL
1 Pas. Instalasi Titik Lampu
2 Pas. Instalasi Titik Stop Kontak

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN SATUAN ITEM PEKERJAAN

1 2
3 1 M1 Pas. Kabel NYY 3 x 4 mm²
4 1 bh Pas. Stop Kontak Schneider
5 1 bh Pas. Stop Kontak AC + Fan Schneider
6 1 bh Pas. Sakelar Tunggal Schneider
7 1 bh Pas. Sakelar Ganda Schneider
8 Panel SDP
9 1 M1 Pipa PVC Class AW Ø 6”
10 1 M1 Pipa PVC Class AW Ø 4”
11 1 M1 Pipa PVC Class AW Ø 3”
12 1 M1 Pipa PVC Rucika Ø 1”
13 1 M1 Pipa PVC Rucika Ø 1/2”
14 1 M1 Pipa GIP Ø 1”/32 mm
15 1 M1 Pipa GIP Ø 3/4”/25 mm
16 AC Wall Mounted 2PK

RENCANA ANGGARAN BIAYA


PEKERJAAN :
PEMB. WORKSHOP LISTRIK DAN AC
LOKASI :
KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. :
2021

STRUKTUR
NO URAIAN ITEM PEKERJAAN

1 2

I. PEKERJAAN PERSIAPAN
A PERKERJAAN AWAL
1 Pek. Bauwplank
2 Pembersihan Lapangan/Lokasi Proyek

B PEKERJAAN RKK3
a. PENYIAPAN RK3K
1 Pembuatan manual, prosedur, intruksi kerja, ijin kerja
2 Pembuatan Kartu Identitas Pekerja (KIP)

b. ALAT PELINDUNG DIRI


1 Topi pelindung (safety helmet)
2 Pelidung mata (googles,spectacles)
3 Tameng muka (face sheild)
4 Sarung tangan (safety gloves)
5 Sepatu keselamatan (safety shoes)
6 Penunjang seluruh tubuh (full body harmess)
8 Rompi keselamatan (safety vest)
C PEKERJAAN PENDAHULUAN
1 Pembongkaran Bak Air dan Selasar

SUB TOTAL I -ABC


II. A PEKERJAAN TANAH

1 Urugan Kembali dipadatkan


2 Urugan Tanah dgn Alat Berat, Pemadatan Tanah 20 cm / Layer
3 Urugan Tanah Bawah Lantai Tb: 35 Cm [Dipadatkan]
4 Urugan Sirtu Bawah Lantai Tb: 15 Cm

SUB TOTAL II A-B

III. PEKERJAAN SUB STRUKTUR

A PONDASI SUMURAN K-250


1 Pek. Pondasi Sumuran Dia 120 cm; H: 3 M
Pek. GalianTanah
Anal Galian Tanah 1 M Pertama
Anal Galian Tanah 1 M Kedua
Anal Galian Tanah 1 M Ketiga
Pek. Beton dan Cincin Sumuran
Anal Beton Cyclopen1:2:3 + 40 % Batu Kali
Anal Beton Kedap Air , K-250
Anal Lt Kerja tb 5 Cm, K-100
Buis Beton Dia 100 Cm
Pek. Penurunan Cincin
Anal. Upah Penurunan Cincin Sumuran 1
Anal. Upah Penurunan Cincin Sumuran 2
Anal. Upah Penurunan Cincin Sumuran 3

2 Pek. Poer 160x160x 40 ; K-250, U-39


Anal Beton K 250 (Ready Mix)
Bekisting / Cetakan
Pembesian

B PONDASI PONDASI BATU KALI


1 Pek. Aanstampang
2 Pek. Pondasi Bau Kali 1:4
3 Pas. Lantai Kerja Beton K-100
SUB TOTAL III

IV. PEKERJAAN STRUKTUR LANTAI -I

1 A PEKERJAAN BETON SITE MIX


1 Pek. Sloof 35/60; K250 U-39
Anal Beton K 250 / Ready Mix
Bekisting / Cetakan
Pembesian

2 Pas. Lantai Kerja Beton K-100


3 Pek. Cor Lantai Beton tb : 10 cm
Anal Beton K 300 / Ready Mix
Bekisting / Cetakan
Wiremesh M6-150

STRUKTUR
PEKERJAAN :
PEMB. WORKSHOP LISTRIK DAN AC
LOKASI :
KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. :
2021

NO URAIAN ITEM PEKERJAAN

1 2
4 Pek. Kolom 40x70
Anal Beton K 250 / Ready Mix
Bekisting / Cetakan
Pembesian

B PEKERJAAN STRUKTUR BAJA


1 Struktur Kolom Baja IWF. 600.300.12.20
2 Struktur Balok Baja IWF. 400.200.7.11
3 Struktur Balok Anak Baja IWF. 200.150.6.9
4 Pekerjaan Base Plate dan End Plate Kolom
5 Pekerjaan Stifner Kolom Baja IWF 600.300.12.20
6 Pekerjaan Pemasangan Angkur Bolt M24 AB-03
7 Pekerjaan Stifner Balok IWF 400.200.7.11
8 Pekerjaan End Plate Balok IWF 400.200.7.11
9 Baut Sambungan Balok M16
10 Pekerjaan Base Plate Balok IWF 200.150.6.9

SUB TOTAL IV-1 A- B


V. PEKERJAAN STRUKTUR LANTAI -II

A PEKERJAAN STRUKTUR BAJA


1 Struktur Kolom Baja IWF. 600.300.12.20
2 Struktur Gable Baja IWF. 600.300.12.20
3 Struktur R.Balok Baja IWF. 400.200.7.11
4 Pekerjaan Stifner Kolom Baja IWF 600.300.12.20
5 Pekerjaan Stifner Gable IWF 600.300.12.20
6 Pekerjaan Stifner Balok IWF 400.200.7.11
7 Pekerjaan End Plate Balok IWF 400.200.7.11
8 Pekerjaan End Plate Gable 600.300.12.20
9 Baut Sambungan Balok M16
10 Baut Sambungan Gable 600.300.12.20 M32

5 Shear Conector
6 Plat Lantai Beton tb 12 cm
Beton K-300 /Ready Mix
Bekisting Plat Bondek, Smardek tb 0.7 mm
Pembesian

7 Tangga Baja Komplete + Railling Fin Cat


8 Struktur Baja U 250.90.9.13
9 Struktur Kolom Baja IWF. 600.300.12.20
10 Anak Tangga Baja Siku 60.60.6.8
11 Plat Baja Cheker Plate Tb 2mm
12 Pek. Base Plat,samb dan Las serta Stek,Stifner
13 Railling Tangga Steinlesstell

SUB TOTAL V-A B

VI. PEKERJAAN STRUKTUR ATAP

1 Pekerjaan Pas. Gording CNP. 200.75.20.3,2


2 Pek. Ikatan Angin, Siku dan Sambungan
3 Trunk Buckle
4 Pek. Penggantung Lampu dan ME
5 Pek. Penggantung Gantungan Plafond/Baja Galvalum

SUB TOTAL VI

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


REKAPITULASI

STRUKTUR
LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN PEKERJAAN BOBOT


(%)

1 2 3

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH

III. PEKERJAAN SUB STRUKTUR

IV. PEKERJAAN STRUKTUR LANTAI -I

V. PEKERJAAN STRUKTUR LANTAI -II

VI. PEKERJAAN STRUKTUR ATAP

A JUMLAH TOTAL
B JUMLAH
C DIBULATKAN

D TERBILANG :

Dibuat Oleh
PENAWAR
PT/CV……………………………
NAMA JELAS
DIREKTUR

Rekap
RENCANA ANGGARAN BIAYA
PEKERJAAN :
PEMB. WORKSHOP LISTRIK DAN AC
LOKASI :
KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. :
2021

ARSITEKTUR
NO URAIAN ITEM PEKERJAAN ANL

1 2 3

I. PEK. COR BETON DAN RABAT KELILING

1 Pek Pondasi Batu Bata 32


2 Pek Cor Beton atau Rabat Keliling Bangunan K-175 16
3 Plesteran 1:2 Lantai Rabat Beton 37

SUB TOTAL I

II. PEKERJAAN ARSITEKTUR


B. PEKERJAAN ARSITEKTUR LANTAI -I

1 PEKERJAAN DINDING
a Pas. Dinding Batu Bata 1 : 2 32
b Pas. Dinding Batu Bata 1 : 4 34
c Plesteran Dinding 1 : 2 37
d Plesteran Dinding 1 : 4 39
e Pas. Acian Dinding 42
f Pek. Skoning 1 : 3 38
g Stek Besi Dr Baja Ke Dinidng Bata 21

h Pas. Blk Latey Uk.10/15 cm 31


i Pas. Kolom Praktis Uk. 11x11 cm 30
j Pas. Batu Andesit Polos 49
k Pas. Profil Beton 10 cm. Ls

SUB TOTAL II- B1


2 PEKERJAAN PLAFOND & PARTISI
A PEKERJAAN PLAFOND
1 Pas. Plafond Gypsun Board +Rangka +Asc Complete 58
2 Pas. List Plafond Gypsun Board 60
3 Pas. Plafond PVC + Rangka+ Asc Complete [Toilet] 59
4 Pas. Waterproofing Din. Toilet 54

SUB TOTAL II -B2


3 PEKERJAAN LANTAI

1 Pas. Lantai Granite uk 60x60 Merk Surface 43


2 Pas. Lantai Epoxy 2.000 micron UCRETE MF BASF
3 Pek. Super Flat Floor+ 3 kg F.Hardener / Levelling
4 Pas. Lt. Granite uk 60x60 Non Polished, Merk Surface 44
5 Pas. Plint Granit 10 x 60 cm. 47
6 Pas. Lantai Granite Homogeneus,Merk Surface[Tangga] 43
7 Pas. Step Noshing Granit 10 x 60 cm. [Tangga Ent] 52

SUB TOTAL II -B3

4 PEKERJAAN PINTU / JENDELA


TYPE ALUMINIUM

1 Pas. Pintu Double Type Mark Steel Door, Uk.2150x2000x50 mm


+ Acc Komplete
2 Pek. Panel ACP PPDF 0,3 ,Tb 4 mm, {SEVEN] 105
3 Pas. Kusen / Pintu Type PA.03 [Toilet] 99
4 Pas. Kusen / Jendela Type JA-1 AC 90
5 Pas. Kusen / Jendela Type J1.3 AC 91
6 Pas. Kusen / Jendela Type J1.4 AC 92
7 Pas. Kusen Type BV-1 95
8 Pas. Pintu Shaft / Aluminium
9 Pas. Teralis Besi /Pengaman 74

SUB TOTAL II -B4

5 PEKERJAAN PENGECATAN

1 Mencat Dinding Exterior Cat Jotashield 64


2 Mencat Dinding Interior. Cat Jotun Majestic 65
3 Mencat Plafond Cat Interior Jotun Majestic 65
4 Mencat Bid Baja Expose, Cat Duco 66

SUB TOTAL III -B5


6 PEKERJAAN TOILET DAN KM/WC + R.CUCI
1 Pas. Granite Dinding. 30x60 , Merk Surface 46
2 Pas. Granite Lantai Unpolish. 60x60, Merk Surface 44
3 Pas. Water Proofing Lantai & Dinding Toilet 53

ARSITEKTUR
PEKERJAAN :
PEMB. WORKSHOP LISTRIK DAN AC
LOKASI :
KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. :
2021

NO URAIAN ITEM PEKERJAAN ANL

1 2 3
PEKERJAAN SANITARY FIXTURES
1 Closet Duduk. TOTO CW 421 J 108
2 Jet Washer, TOTO THX 20 MCRB 110
3 Kran Air 3/4”, TOTO T 23 B 13 115
4 Urinoir , TOTO U 57 110
5 Sekat Urinoir, TOTO A-100 119
6 Floor Drain, TOTO 114

SUB TOTAL II -B6

III. PEKERJAAN ARSITEKTUR LANTAI - II


1 PEKERJAAN DINDING

a Pas. Dinding Batu Bata 1 : 2 32


b Pas. Dinding Batu Bata 1 : 4 34
c Plesteran Dinding 1 : 2 37
d Plesteran Dinding 1 : 4 39
e Pas. Acian Dinding 42
f Pek. Skoning 1 : 3 38
g Stek Besi Dr Baja Ke Dinidng Bata 21
h Pas. Blk Latey Uk.10/15 cm 31
i Pas. Kolom Praktis Uk. 11x11 cm 30

SUB TOTAL III -B1

2 PEKERJAAN PLAFOND & PARTISI


1 Pas. Partisi Kaca Tb 10 mm+ Pintu Asc 85
A PEKERJAAN PLAFOND
1 Pas. Plafond Gypsun Board +Rangka +Asc Complete 58
2 Pas. List Plafond Gypsun Board 60
3 Pas. Plafond PVC + Rangka+ Asc Complete 59

SUB TOTAL III -B2

3 PEKERJAAN LANTAI

1 Pas. Lantai Granite Homogeneus uk 60x60, Merk Surface 43


2 Pek. Super Flat Floor + 3 kg F.Hardener / Levelling
3 Pas. Lantai Epoxy 2.000 micron UCRETE MF BASF

SUB TOTAL III -B3

4 PEKERJAAN PINTU / JENDELA


TYPE ALUMINIUM
1 Pek. Panel ACP PPDF 0,3 ,Tb 4 mm, [SEVEN] 105
2 Pek. Panel ACP PPDF 0.3 ,Tb 4 mm Perporated /Cutting Laser 106
3 Pas. Pintu Double Type Mark Steel Door, Uk.2150x2000x50 mm
+ Acc Komplet
4 Pas. Kusen / Jendela Type J1.3 AC 91
5 Pas. Kusen / Jendela Type J1-4 AC 92
6 Pas. Kusen / Jendela Type JA-1 AC 90
7 Pas. Kusen / Jendela Type JA-2 AC 93
8 Pas. Kusen / Jendela Type JA-3 AC 94
9 Pas. Kusen Type BV-1 95
10 Pas. Kusen / Pintu Type PA.03 [Toilet] 99
11 Pas. Pintu Shaft / Aluminium

SUB TOTAL III -B4

5 PEKERJAAN PENGECATAN
a Mencat Dinding Exterior. Cat Jotashield 64
b Mencat Dinding Interior. Cat Jotun Majestic 65
c Mencat Plafond Cat Interior Jotun Majestic 65
d Mencat Bid Baja Expose, Cat Duco 66

SUB TOTAL III -B5


6 PEKERJAAN TOILET DAN KM/WC

1 Pas. Granite Dinding. 30x60, Merk Surface 46


2 Pas. Granite Lantai Uk. 60x60, Merk Surface 44
3 Pas. Water Proofing Lantai & Dinding Toilet 53

PEKERJAAN SANITARY FIXTURES


1 Closet Duduk. TOTO CW 421 J 108
2 Jet Washer, TOTO THX 20 MCRB 110
3 Kran Air 3/4" , TOTO T 23 B 13 115
4 Urinoir Type, TOTO U 57 110

ARSITEKTUR
PEKERJAAN :
PEMB. WORKSHOP LISTRIK DAN AC
LOKASI :
KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. :
2021

NO URAIAN ITEM PEKERJAAN ANL

1 2 3
5 Sekat Urinoir, TOTO A-100 119
6 Floor Drain, TOTO 114

SUB TOTAL III -B6


IV. PEKERJAAN ATAP & PELINGKUP

1 Pek. Atap Long Spandeck tb 0.4 mm. Rainbbow Metal Deck 122
RMD (1000), Warna Natural,G550, AZ150
2 Pas. Lapisan Aluminium Foil 126
Metalizing Foil 2 sisi + PE Bubble, 4mm

3 Pas. Plafond Gypsunboard 58


4 Pas. List Plafond Gypsunboard 60
5 Pek. Nok dan Bubungan 123
6 Pek. Listplank 125
7 Pek. Talang Air PVC
8 Pek. Ornamen Kisi-Kisi Aluminium / Singok 104

SUB TOTAL IV
V. PEKERJAAN LUAR HALAMAN & LAIN-LAINYA
A. PEKERJAAN BAK RESEVOIR DAN BIOTECH
PEK. TANAH & URUGAN
1 Galian Tanah Keras 3
2 Urugan Kembali dipadatkan 6

PEK. BAK RESEVOIR


1 Pas. Dinding Batu Bata 1 : 2 32
2 Plesteran Dinding 1 : 2 37
3 Pas. Cor beton K-175,Tb 15 cm 16
4 Lantai Kerja 1:3:5 , K-100 14

5 Sloof Praktis 31
6 Kolom Praktis Uk. 11x11 cm 30
7 Balok Praktis Uk. 10x15 cm 31

8 Pek. Plat Tb 8 cm K-225


Beton K-225 17
Bekisting/Cetakan 27
Besi 21

B. PEKERJAAN SALURAN KELILING


I. SALURAN KELILING BANGUNAN
1 Pas. Dinding Batu Bata 1 : 2 32
2 Plesteran Dinding 1 : 2 37
3 Pas. Cor beton K-175,Tb 10 cm 16

II. HALAMAN
1 Pas. Lapisan Pasir tb 10 cm 9
2 Pas. Urugan Sirtu 10
3 Pas. Paving Block 127
4 Pas. Kanstin 129
5 Pas. Grill Penutup Saluran 130
6 Pek. Pas. Sirtu yang dipadatkan 10
7 Pas. Grass Block Type 8 Lobang + Rumput Mini 128

C. PEKERJAAN LAIN-LAINYA
1 Pas. Letering Nama Workshop ,H: 50 Cm Steinlessstell
Steinllestell + Acrillic/ backlight
“ Listrik dan AC ”

SUB TOTAL V ABC

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


REKAPITULASI

ARSITEKTUR
LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN PEKERJAAN BOBOT


(%)

1 2 3

II. PEK. COR BETON DAN RABAT KELILING

III. PEKERJAAN ARSITEKTUR


A. PEKERJAAN ARSITEKTUR LANTAI -I
1 PEKERJAAN DINDING
2 PEKERJAAN PLAFOND & PARTISI
3 PEKERJAAN LANTAI
4 PEKERJAAN PINTU / JENDELA
5 PEKERJAAN PENGECATAN
6 PEKERJAAN TOILET DAN KM /WC

III. B. PEKERJAAN ARSITEKTUR LANTAI - II
1 PEKERJAAN DINDING
2 PEKERJAAN PLAFOND & PARTISI
3 PEKERJAAN LANTAI
4 PEKERJAAN PINTU / JENDELA
5 PEKERJAAN PENGECATAN
6 PEKERJAAN TOILET DAN KM /WC
IV. PEKERJAAN ATAP & PELINGKUP

V. PEKERJAAN LUAR HALAMAN & LAIN-LAINYA

A JUMLAH TOTAL
B JUMLAH
C DIBULATKAN

D TERBILANG :

Dibuat Oleh
PENAWAR
PT/CV……………………………

NAMA JELAS
DIREKTUR

Rekap
RENCANA ANGGARAN BIAYA
PEKERJAAN :
PEMB. WORKSHOP LISTRIK DAN AC
LOKASI :
KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. :
2021

MEKANIKAL & ELEKTRIKAL

NO URAIAN ITEM PEKERJAAN

1 2
A. PEK. MEKANIKAL LT I & II
I. PEK. INSTALASI LISTRIK LT I
1 Pas. Instalasi Penerangan NYM 3 x 2.5 mm Dalam Conduit
2 Pas. Instalasi Stop Kontak
3 Pas. Stop Kontak Ex. Schneider
4 Pas. Stop Kontak AC Ex. Schneider
5 Pas. Sakelar Tunggal Ex. Schneider
6 Pas. Sakelar Ganda Ex. Schneider
7 Pas. Lampu 59494 MESON 125 13 W 65 K
8 Pas. Lampu Downligths DN027C LED20/CW23 W
9 Pas. Lampu RC091V LED 356/840 PSU
II. PEK. INSTALASI LISTRIK LT II
1 Pas. Instalasi Penerangan NYM 3 x 2.5 mm Dalam Conduit
2 Pas. Instalasi Stop Kontak
3 Pas. Stop Kontak Ex. Schneider
4 Pas. Stop Kontak AC Ex. Schneider
5 Pas. Sakelar Tunggal Ex. Schneider
6 Pas. Sakelar Ganda Ex. Schneider
7 Pas. Lampu 59494 MESON 125 13 W 65 K
8 Pas. Lampu Downligths DN027C LED20/CW23 W
9 Pas. Lampu RC091V LED 356/840 PSU

SUB TOTAL A I & II


B. PEK. PERLENGKAPAN UTAMA/ EQUIPMENT
1. Kabel Feeder
1 Pas. Kbl dr Meteran PLN ke MDP Gedung NYY 4x50 mm NYY1x35mm
2 Pas. Kbl dr MDP ke SDP.Pompa booster rooftank NYY 4x4 mm
3 Pas. Kbl dr MDP ke SDP.Pompa Panel Pompa Sumur Bor NYY 4x6 mm

2. Kabel Power Lantai 1


1 Pas. Kbl dr MDP Gedung ke SDP.1 NYY 4x10 mm NYY1x16mm
2 Pas. Kbl dr SDP.1 Gedung ke PP.1 NYY 4x6 mm NYY1x16mm
3 Pas. Kbl dr SDP.1 Gedung ke PP.2 NYY 4x6 mm NYY1x16mm

3. Kabel Power Lantai 2


1 Pas. Kbl dr MDP Gedung ke SDP.2 NYY 4x16 mm NYY1x16mm

SUB TOTAL B
C. PEK. PANEL DAN DAYA

1 Pek. Panel MDP Gedung Lantai 1


2 Pek. Panel Penerangan PP Lantai 1
3 Pek. Panel Penerangan PP Lantai 2

SUB TOTAL D
D. PEK. MEKANIKAL
PEK. PLUMBING (AIR BERSIH dan AIR KOTOR)
1 Pas. Pipa PVC Rucika Ø 1" (dr Sumber Ke. Pompa Transfer & ke Roof Tan
2 Pas. Pompa Transfer Air Bersih Lengkap Fitting 2,
* Pipa hisap & Kabel Power + WLC
**Type : SANYO TYPE PH 250 WATT

3 Pas. Pipa PVC Class AW Ø 4" dari Toilet ke Septicktank


4 Pas. Pipa PVC Class AW Ø 3" Air Kotor Cair ke Saluran Keliling
5 Pas. Pipa PVC Rucika Ø 1"
6 Pas. Pipa PVC Rucika Ø 1/2"
7 Pas. Pipa PVC Class AW Ø 4" Air Hujan
8 Pas. Septictank BIOFIL Kapaistas : 3 M3,
9 Pas. Exhaust Fan + Assc Komplete
10 Pas. AC Kap 2PK, Merk Daikin + Instalasi

SUB TOTAL E

PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC


REKAPITULASI
MEKANIKAL & ELEKTRIKAL

LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG


THN.ANGG. : 2021

NO. URAIAN PEKERJAAN BOBOT


(%)

1 2 3

I. PEK. MEKANIKAL LT I & II

II. PEK. PERLENGKAPAN UTAMA/ EQUIPMENT

III. PEK. PANEL DAN DAYA

IV. PEK. MEKANIKAL

A JUMLAH TOTAL
B JUMLAH
C DIBULATKAN

D TERBILANG :
Dibuat Oleh
PENAWAR
PT/CV……………………………

NAMA JELAS
DIREKTUR

Rekap_ME
REKAPITULASI RENCANA ANGGA
PEKERJAAN : PEMB. WORKSHOP LISTRIK DAN AC
LOKASI : KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG. : 2021

NO. URAIAN PEKERJAAN BOBOT


(%)

1 2 3

I. A. PEKERJAAN STRUKTUR
1 PEKERJAAN PERSIAPAN
2 PEKERJAAN TANAH
3 PEKERJAAN SUB STRUKTUR
4 PEKERJAAN STRUKTUR LANTAI -I
5 PEKERJAAN STRUKTUR LANTAI -II
6 PEKERJAAN STRUKTUR ATAP

II. B. PEKERJAAN ARSITEKTUR


1 PEK. COR BETON DAN RABAT KELILING
2 PEKERJAAN ARSITEKTUR LANTAI -I
3 PEKERJAAN ARSITEKTUR LANTAI - II
4 PEKERJAAN ATAP & PELINGKUP
5 PEKERJAAN LUAR HALAMAN & LAIN-LAINYA
III. C. PEKERJAAN ELEKTRIKAL

IV. D. PEKERJAAN MEKANIKAL & PLUMBING

A JUMLAH T O T A L [ I + II + III + IV ]
B TOTAL PEKERJAN FISIK BANGUNAN
Ppn 10%
C JUM
D DIBULATKAN LAH
TOT
AL
E TERBILANG :

Dibuat Oleh
PENAWAR
PT/CV……………………………

NAMA JELAS
DIREKTUR

Rekapitulasi

PEKERJAAN
: PEMB. WORKSHOP LISTRIK DAN AC
LOKASI
: KOMPLEKS BALAI LATIHAN KERJA - PADANG
THN.ANGG.
: 2021

BOBOT ( %
)
NO. U R A I A N PEKERJAAN

A. PEKERJAAN STRUKTUR
1 PEKERJAAN PERSIAPAN 0.00

2 PEKERJAAN TANAH 0.00

3 PEKERJAAN SUB STRUKTUR 0.00

4 PEKERJAAN STRUKTUR LT I 0.00

5 PEKERJAAN STRUKTUR LT II 0.00

6 PEKERJAAN STRUKTUR ATAP 0.00

B. PEKERJAAN ARSITEKTUR
2 PEKERJAAN TANAH 0.00

3 PEKERJAAN ARSITEKTUR LANTAI -I 0.00


4 PEKERJAAN ARSITEKTUR LANTAI - II 0.00

5 PEKERJAAN ATAP & PELINGKUP 0.00

6 PEKERJAAN LUAR HALAMAN & LAIN-LAINYA 0.00

C. PEKERJAAN M E P
1 PEKERJAAN ELEKTRIKAL 0.00

2 PEKERJAAN MEKANIKAL & PLUMBING 0.00

0.00
0.00
RENCANA JUMLAH BOBOT PER MINGGU
BOBOT JUMLAH BOBOT AKUMULATIF
REALISASI JUMLAH BOBOT PER MINGGU
BOBOT JUMLAH BOBOT AKUMULATIF
DEVIASI TERCEPAT ( + )
BOBOT TERLAMBAT ( - )

**Waktu Pelaksanaan : 145 Hari Kalender


**
SAT HARGA SATUAN KETERANGAN

3 4 5

Hari Rp. – /jam


Hari Rp. – 0.00 /jam
Hari Rp. – 0.00 /jam
Hari Rp. – 0.00 /jam
Hari Rp. – 0.00 /jam
Hari Rp. – 0.00 /jam
Hari Rp. – 0.00 /jam
Hari Rp. – 0.00 /jam

M³ 0
M³ 0
M³ 0
M³ 0
M³ 0
M³ 0
M³ 0
M³ 0
M³ 0
Zak 0 0.00 /Kg
Kg 0
Bh 0
Bh 0
M
2 0
M
2 0
M
2 0
Bh 0 0 /dus
Bh 0 0 /dus
Bh 0
Bh 0
Bh 0 0 /dus
Bh 0
Bh 0
Bh 0
Kg 0
M³ 0
M³ 0

M³ 0
M³ 0
M³ 0
M³ 0
M³ 0
M³ 0
M³ 0
M³ 0
Btg 0
Lbr 0 0.00 /M2
Lbr 0
M' 0

Kg 0
Kg 0
M
2 0 0.00 34.76 Kg
M
2 0 0.00 61.79 Kg
Kg 0
Kg 0
btg 0 0.00 Kg
M
2 0
Kg 0
M
2 0
Kg 0
Kg 0
Kg 0
Hal 1 dari 4
SAT HARGA SATUAN KETERANGAN

3 4 5
Kg 0
Bh 0
Kg 0
Bh 0
M' 0
M' 0
Btg 0
Btg 0
Btg 0
Btg 0
Unit 0
M
2 0
Daun 0
M' 0

Lbr 0 0 /M2
Lbr 0 0 /M2
Lbr 0
M' 0
Bh 0
M' 0
Bh 0
Bh 0
Pcs 0
Zak 0
M' 0
Btg 0
Btg 0
Btg 0
M' 0
Bh 0
M' 0
Kg 0
Kg 0
Kg 0
Kg 0
Kg 0
Kg 0
Kg 0
Kg 0
Ltr 0
Ltr 0
Kg 0
Kg 0
Kg 0
Kg 0
Kg 0
Bh 0
Ltr 0
Ltr 0
Kg 0

M2 0
Buah 0
Set 0
Tube 0
M' 0
Pcs 0
Pcs 0
Pcs 0
Pcs 0
Pcs 0
Pcs 0
Pcs 0
Pcs 0
Hal 2 dari 4
SAT HARGA SATUAN KETERANGAN

3 4 5
Kg 0

Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Set 0

M' 0 Merk Alexindo


M' 0 Merk Alexindo
Daun 0
Daun 0
M2 0
M2 0 Merk Asahimas
M2 0 Merk Asahimas
M2 0 Merk Asahimas
M2 0
M2 0
Bh 0 Merk Dekson
Bh 0 Merk Dekson
M2 0
Bh 0 Merk Dekson
Bh 0 Merk Dekson
Bh 0 Merk Dekson
Psg 0 Merk Dekson
Psg 0 Merk Dekson
Psg 0 Merk Dekson
Bh 0 Merk Dekson
Set 0
M' 0
M' 0

M' 0 Merk RMD Roof


Lbr 0 0.00 /M'
Lbr 0 0.00 /M'
Bh 0
Bh 0
M² 0 0.00 /Rol

Ltr 0
M3 0
Bh 0
Bh 0
Bh 0
M' 0 19,400.00 /Btg
lbr 0
Ltr 0
Ltr 0
Kg 0
M² 0

Hal 3 dari 4
SAT HARGA SATUAN KETERANGAN

3 4 5
M' 0
M' 0
Bh 0
Bh 0
Bh 0
M' 0
Unit 0
Unit 0
Unit 0
Unit 0
Unit 0
Bh 0
Bh 0
Bh 0
Unit 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Bh 0
Ls 0
Bh 0
Ls 0

M' 0
M' 0
M' 0
M' 0
M' 0
Unit 0
Bh 0
M' 0
M' 0
Lot 0
Lot 0
Lot 0
Lot 0
Lot 0

Kg 0
Kg 0

% 10.00 0.100

Kg 0
Ltr 0
Set 0
Set 0

/……/2021
at Oleh
AWAR
……………………
A JELAS
EKTUR

Hal 4 dari 4
P]

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
0 M³ Kayu Balok 5/7 Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

Rp. – Rp. –

Rp. – Rp. –
OH Mandor Rp. – Rp. –

Rp. – Rp. –

OH Mandor Rp. – Rp. –


Rp. – Rp. –

Rp. –

OH Mandor Rp. – Rp. –


Rp. – Rp. –

Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –

Rp. –

OH Mandor Rp. – Rp. –


Rp. – Rp. –

Rp. –

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. –

Rp. –
Rp. – Rp. –

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Ls Alat Bantu Rp. – Rp. –
Rp. – Rp. –

Rp. – Rp. –

Rp. – Rp. –
OH Mandor Rp. – Rp. –
ah Rp. –

Rp. –
Rp. – Rp. –
Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. –

Rp. –
Rp. – Rp. –

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
M3 Pasir Pasang Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
M3 Pasir Pasang Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
M3 Pasir Urug Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

+2) CM, w/c=0.87 Rp. – Rp. –


OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
9 M3 Pasir Beton Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.
+2) CM, w/c=0.78 Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
4 M3 Pasir Beton Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

2+2) CM, w/c=0.66 Rp. – Rp. –


OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
9 M3 Pasir Beton Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

2+2) CM, w/c=0.58 Rp. – Rp. –


OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
6 M3 Pasir Beton Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5

Kedap Air, Slump (12+2) CM, w/c=0.56


OH Mandor Rp. – Rp. –
Rp. – Rp. –
3 M3 Pasir Beton Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Kedap Air, Slump (12+2) CM, w/c=0.52


OH Mandor Rp. – Rp. –
Rp. – Rp. –
4 M3 Pasir Beton Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
% Batu Belah Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

M3 Pasir Beton Rp. – Rp.


Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

OH Mandor Rp. – Rp. –


Rp. – Rp. –
Kg Kawat Beton Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

OH Mandor Rp. – Rp. –


Rp. – Rp. –
0.0500 Kg Kawat Beton Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
OH Tukang Kayu Rp. – Rp. –
Rp. – Rp. –
Kelas III 0.3000 Kg Paku Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

OH Tukang Kayu Rp. – Rp. –


Rp. – Rp. –
Kelas III 0.3000 Kg Paku Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5

OH Tukang Kayu Rp. – Rp. –


Rp. – Rp. –
Kelas III 0.4000 Kg Paku Rp. – Rp. –
Rp. – Rp. –
wood Tebal 9 mm
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

OH Tukang Kayu Rp. – Rp. –


Rp. – Rp. –
Kelas III 0.4000 Kg Paku Rp. – Rp. –
Rp. – Rp. –
wood Tebal 9 mm Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

OH Tukang Kayu Rp. – Rp. –


Rp. – Rp. –
Kelas III 0.4000 Kg Paku Rp. – Rp. –
Rp. – Rp. –
wood Tebal 9 mm Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

OH Tukang Kayu Rp. – Rp. –


Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

Rp. – Rp. –
Rp. – Rp. –

OH Tukang Kayu Rp. – Rp. –


Rp. – Rp. –
Kelas III 0.4000 Kg Paku Rp. – Rp. –
Rp. – Rp. –
wood Tebal 9 mm Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

OH Tukang Kayu Rp. – Rp. –


Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
M3 Pasir Beton Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Tukang Kayu Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Kg Paku Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
M3 Pasir Beton Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

AN
Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
M3 Pasir Pasang Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
M3 Pasir Pasang Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
M3 Pasir Pasang Rp. – Rp.
Rp. – Rp.

Rp. – Rp.
10 cm Camp Spesi 1 : 3 Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
0x10 cm 11.0000 Kg Semen Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
/Zak) 0.0160 M3 Pasir Pasang Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. –

Rp.

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
/Zak) 0.0200 M3 Pasir Pasang Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

m Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
/Zak) 0.0230 M3 Pasir Pasang Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
/Zak) 0.0240 M3 Pasir Pasang Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
/Zak) 15.0000 Kg Batu Granit Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.
Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
/Zak) 0.0120 M3 Pasir Pasang Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
/Zak) Jumlah Rp. –

Rp.
Rp. – Rp.

N DINDING

Surface Rp. – Rp. –


OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
shed 60x60 , Merk Surface 9.8000 Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.
erk Surface Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Polished 60x60, Merk Surface 9.8000 Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

OH Mandor Rp. – Rp. –


Rp. – Rp. –

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
Rp. – Rp. –
Rp. – Rp. –
0x40 8.1900 Kg Semen Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.
Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
3 Pasir Pasang Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
3 Pasir Pasang Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Pasir Pasang Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

.5 cm Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
15x30x1,5 cm 11.7500 Kg Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

m Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Uk. 20x40x1,5 cm 11.7500 Kg Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
11.7500 Kg Semen Portland (50 Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
60 cm 1.1400 Kg Semen Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
Rp. –

Rp.
Rp. – Rp.

Rp. – Rp. –
OH Mandor Rp. – Rp. –
creed Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp. –
OH Tukang Batu Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. –

Rp.
Rp. – Rp.

n Jendela, Kayu Kelas I Rp. – Rp. –


H Tukang Kayu Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Kg Paku 10 cm Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

u Kelas I Rp. – Rp. –


Tukang Kayu Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Kg Lem Kayu Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

ARTISI

m Jarak 60x60 cm Rp. – Rp. – Rp.


Tukang Kayu Rp. – Rp. – Rp.
Rp. – Rp. – Rp.
Rp. – Rp. – Rp.
0.4600 Btg Hollow 20x40x0,06 Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
amp Hollow 20x40 0.7000 Bh Rp. – Rp.
mm 25.0000 Pcs Skrup Gypsum Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. –
Rp. –
Rp. –
Rp. –

Rp. – Rp.

Rp. – Rp. –
Tukang Kayu Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Btg Crosstee@1,2 m Rp. –
Rp. –

Rp.
Rp.
TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
Kait/Tekuk @1 m Rp. – Rp.
Rp. – Rp.
Paku Beton 1"
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Kepala Tukang Rp. – Rp. –


Rp. – Rp. –
00 Kg Paku Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Tukang Kayu Rp. – Rp. –


Rp. – Rp. –
m 0.3000 Kg Paku Sekrup Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

0.1000 Kg Paku Sekrup


Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

at Penutup Rp. – Rp. –


OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Kg Plamur Kayu Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

ead Rp. – Rp.

Dasar + 2 Lap. Cat Penutup [Exterior]


OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Kg Cat Dasar Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Dasar + 2 Lap. Cat Penutup [Interior]


OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Kg Cat Dasar Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

prot Sistem 3 Lapis Cat


OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
k 0.0100 Ltr Pengencer Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
Rp. – Rp.

Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
a Propan 0.0100 Bh Kuas Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

NTU/ JENDELA

Rp. – Rp. –
Rp. – Rp. –
epala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. –

Rp.
Rp. – Rp.

ngka Baja Siku/ M2 Rp. – Rp. –


OH Tukang Besi Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Kawat Las Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Liter Solar Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp. –
Tukang Las Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
h Rp. –

Rp.
Rp. – Rp.

Alexindo] Rp. – Rp. –


Rp. – Rp. –
Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
oating 2.0000 Buah Skrup Fixer Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

ndo] Rp. – Rp. –


OH Tukang Besi Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
oating 2.0000 Buah Skrup Fixer Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.
Rp. – Rp. –
OH Tukang Las Rp. – Rp. –
Rp. – Rp. –

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
Rp. – Rp. –
cm Pengelasan Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
Rp. – Rp. –
Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
n [PH DL809 32X350 PSS] Jumlah Rp. –

Rp.
Rp. – Rp.

Rp. – Rp. –
Rp. – Rp. –
Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
0016 22MM SSS Jumlah Rp. –

Rp.
Rp. – Rp.

Rp. – Rp. –
Rp. – Rp. –
Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
kson CH 425 R/H NA Jumlah Rp. –

Rp.
Rp. – Rp.

Rp. – Rp. –
Rp. – Rp. –
Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
SCN 84030 Oval SSS Jumlah Rp. –

Rp.
Rp. – Rp.

Rp. – Rp. –
Rp. – Rp. –
Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
DC DL70MM SN Jumlah Rp. –

Rp.
Rp. – Rp.
Rp. – Rp. –
Rp. – Rp. –
Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. –

Rp.
Rp. – Rp.

Rp. – Rp. –
Rp. – Rp. –
Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
L 4X3X2MM 2BB SSS Jumlah Rp. –

Rp.
Rp. – Rp.

Rp. – Rp. –
Rp. – Rp. –
Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
FS S/S 8" Jumlah Rp. –

Rp.
Rp. – Rp.

Rp. – Rp. –
Rp. – Rp. –
TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
Rp. – Rp. –
Rp. – Rp. –
FS S/S 20" Jumlah Rp. –
Rp.
Rp. – Rp.

m
OH Tukang Kayu Rp. – Rp. –
Rp. – Rp. –
,One Way, tb 8 mm 2.0000 M1 Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

as
OH Tukang Rp. – Rp. –
Rp. – Rp. –
10 mm [clear] 2.0000 M1 Rp. – Rp. –
baut, dynabolt dll) 0.0700 Kg Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

as
OH Tukang

12 mm [clear] 2.0000 M1
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

OH Tukang Rp. – Rp. –


Rp. – Rp. –
m 0.0700 Kg Sealant Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

OH Tukang Besi Rp. – Rp. –


Rp. – Rp. –
m Jumlah Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.
ticker Sandblast Rp. – Rp.
Rp. – Rp.
00 Bh Patch Fitting Dekkson PT 24 PSS Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

ainless steel H = 100 cm 1.0000 Set Rp. – Rp.


RL DL84030 SSS Rp. – Rp.

Rp. – Rp.
00 M2 Kaca Bening tb 8 mm Rp. – Rp.
Rp. – Rp.

Rp. – Rp.
00 M2 Kaca Bening tb 8 mm Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
Psg Engsel Casement 20” ,Ex Dekson Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
400 M' Frame Jendela Kaca 4 " AC+ Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Psg Engsel Casement 20” ,Ex Dekson Rp. – Rp. –
Rp. – Rp. –

Rp. – Rp. –
000 M2 Kaca Bening tb 8 mm Rp. – Rp. –
Rp. – Rp. –

Rp. – Rp. –
50 M2 Kaca Bening tb 8 mm Rp. – Rp. –
Rp. – Rp. –

Rp. – Rp. –
00 M' Frame Kaca 4 " AC+ Asc 0.3200 Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
bh Engsel Casement 8” ,Ex Dekson Rp. – Rp. –
Rp. – Rp. –

Rp. – Rp. –
00 M' Frame Kaca 4 " AC+ Asc 0.6400 Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
bh Engsel Casement 8” ,Ex Dekson Rp. – Rp. –
Rp. – Rp. –
Rp. –
00 M' Frame Kaca 4 " AC+ Asc 0.3200 Rp. –
Rp.
Rp. –
Rp. – Rp. –
Rp. – Rp. –
Engsel Pintu 4 " Dekson Rp. – Rp. –
Rp. – Rp. –
Rp. –
Rp. –

Rp. –
00 M' Frame Kaca 4 " AC+ Asc 0.2400 Rp. –
Rp.
Rp. –
Rp. – Rp. –
Rp. – Rp. –
Engsel Pintu 4 " Dekson Rp. – Rp. –
Rp. – Rp. –
Rp. –
Rp. –

Rp. –
50 M2 Frame Panel Aluminium+ Asc Rp. –
Rp.
Rp. –
Rp. –
Rp. –

Rp. –
00 M' Frame Kaca 4 " AC+ Asc 3.4000 Rp. –
Rp.
Rp. –
Rp. – Rp. –
uble cyclender Rp. – Rp. –
Rp. – Rp. –
Engsel Pintu 4 " Dekson Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. –
Rp. –
Rp. –
00 M' Frame Kaca 4 " AC+ Asc 0.3600 Rp. –
Rp.
Rp. –
Rp.
Rp. –
Rp.
000 set Escutcheon Rp. –
Rp.
Rp. –
Rp.
Rp. – Rp.
Rp.

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
Engsel Pintu 4 " Dekson Rp. – Rp. –
Rp. – Rp. –

00 M' Frame Kaca 4 " AC+ Asc 8.2526 Rp. – Rp. –


mm
Rp. – Rp. –
Double cyclender Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

00 M' Frame Kaca 4 " AC+ Asc 8.2526 Rp. – Rp. –


mm
Rp. – Rp. –
Double cyclender Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

00 M2 Kisi-kisi Aluminium Rp. – Rp. –


Rp. – Rp. –

posite Panel ex. Sevent


Rp. – Rp. –
9/19 Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

m/M' Rp. – Rp. –


m 40 x 40 x 0,6 mm Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

Rp. – Rp. –
/50 Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

Rp. – Rp. –
Rp. – Rp. –
mm Rp. – Rp. –
Rp. – Rp. –
0 Bh Bracket All Rp. – Rp. –
1.0000 Set Steel Bracket Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. –

Rp. – Rp. –

Cutting Laser Pek. Supply dan

Bh Bracket Panel Rp. – Rp. –


Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. –
Rp. – Rp. –

n 15.5625 M2 Finish Cat Rp. – Rp. –


Rp. – Rp. –

TEM PEKERJAN HARGA SATUAN UPAH BAHAN


3 4 5
Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
W 421 J/CW 704 J 0.0600 x Ls Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
CE9 6.0000 Kg Semen Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp.
Portland (50 Kg) 0.0100 M3 Pasir Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
X 20 White Jumlah Rp. –

Rp.
Rp. – Rp.

Buah Rp. – Rp. –


OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
0 J Warna Putih 6.0000 Kg Rp. – Rp.
Rp. – Rp.
pan Rp. – Rp.
Rp. – Rp.

Rp. – Rp.
Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
X 19 B Jumlah Rp. –

Rp.
Rp. – Rp.

Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
yal SB 1 1.0000 Bh Water Drain Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

OH Kepala Tukang Rp. – Rp. –


Rp. – Rp. –

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
Rp. – Rp. –
Rp. – Rp. –
O TX 1 BN Jumlah Rp. –
Rp. –
Rp. – Rp. –

OH Kepala Tukang Rp. – Rp. –


Rp. – Rp. –
Tipe T23 B13 0.0250 M' Seal Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

OH Kepala Tukang Rp. – Rp. –


Rp. – Rp. –
O TXX 609 K 0.0250 Bh Seal Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

OH Tukang Batu Rp. – Rp. –


OTO S 20 Jumlah Rp. – Rp. –
Rp. –
Rp. –
Rp. – Rp. –

Rp. – Rp. –
OH Tukang Batu Rp. – Rp. –
OTO TX 701 AEZ Jumlah Rp. –
Rp. –
Rp. –
Rp. –
Rp. –
Rp. –

Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
OTO A 100 6.0000 Kg Semen Rp. – Rp. –
Rp. – Rp. –
pan Rp. – Rp. –
Rp. – Rp. –
Rp. –
Rp. –

Anl. Besi U24 Rp. – Rp. –


Rp. – Rp. –
Rp. – Rp. –

Anl. Besi U24 Rp. – Rp. –


Rp. – Rp. –
Rp. – Rp. –

50,AZ 150
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rainbow Metal Deck 8.0000 Pcs
Sekrup Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –

Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –

TEM PEKERJAN HARGA SATUAN UPAH BAHAN

3 4 5
Rp. – Rp. –
Pcs Paku Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Paku Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.
Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
ebal 9 mm 0.0500 Kg Paku Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

Rp. – Rp. –
OH Kepala Tukang Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.

gon K-250 / M2 Rp. – Rp. –


OH Tukang Batu Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. –
Rp. –

Rp.
Rp.
Rp. – Rp.
250 / M2 Rp. – Rp. –
OH Tukang Batu Rp. – Rp. –
Rp. – Rp. –
Rp. – Rp. –
Rp. –
0 Rp. –

Rp.
Rp.
Rp. – Rp.

Rp. – Rp. –
OH Tukang Batu Rp. – Rp. –
Rp. – Rp. –
Kg Portlant Cement Rp. – Rp.
Rp. – Rp.
Rp. – Rp.

Rp. – Rp.

Rp. – Rp. –
Pekerja Rp. – Rp. –
00 Alat Bantu Rp. – Rp.
Rp. – Rp.

Rp. – Rp.
HARGA SAT UPAH BAHAN

3 4 5

ANIKAL

Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0
Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0
ow Rp 0 0
Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0

inbow Rp 0 0
Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0
Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0

Schneider Rp 0 0
Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0
Rp 0 0
,5 kA Rp 0 0
,5 kA Rp 0 0
4,5 kA Rp 0 0
4,5 kA Rp 0 0
ype CW-5L 5V 100/5A Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 0
, Support, Pentanahan, Cat, dll) Rp 0 0

Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0

NG

HARGA SAT UPAH BAHAN

3 4 5
Rp 0 0
Rp 0 0
” Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0
Rp 0 0
Rp 0 0
” Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0
Rp 0 0
Rp 0 0
” Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0
Rp 0 0
Rp 0 0
1” Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0
Rp 0 0
Rp 0 0
1” Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0

Rp 0 0
Rp 0 0
Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0

2PK Rp 0 0
ger,support,cat dll) Rp 0 0
Rp 0 0
Rp 0 Rp 0
Rp 0 Rp 0

RJAAN HARGA SATUAN KETERANGAN

3 4

Rp 0
Rp 0

Rp 0
Rp 0
Rp 0
Rp 0

Rp 0
Rp 0
Rp 0

=0.78 Rp 0
/c=0.66 Rp 0
c=0.58 Rp 0
Slump (12+2) CM, w/c=0.56 Rp 0
Slump (12+2) CM, w/c=0.52 Rp 0
Slump (12+2) CM, w/c=0.56 Rp 0
Slump (12+2) CM, w/c=0.52 Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0

Rp 0
Rp 0
Rp 0
Spesi 1 : 3 Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0

NG

Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0

60 cm Rp 0
Rp 0
Rp 0
Rp 0
Rp 0

Datar Harga Satuan 1 dari 3


Pekerjaan

RJAAN HARGA SATUAN KETERANGAN

3 4
p. Cat Penutup [Exterior] Rp 0
p. Cat Penutup [Interior] Rp 0
Rp 0
3 Lapis Cat Rp 0

NDELA

Rp 0
ku/ M2 Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
ex. Sevent Rp 0
er Rp 0

Rp 0

Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0

Rp 0
Rp 0
Rp 0
Rp 0

[ OPTIONAL]

M2 Rp 0
Rp 0
Rp 0

AL
Rp 0
Rp 0
Datar Harga Satuan 2 dari 3
Pekerjaan

RJAAN HARGA SATUAN KETERANGAN

3 4
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0

Datar Harga Satuan 3 dari 3


Pekerjaan

ANL VOLUME HARGA SATUAN JUMLAH HARGA

3 4 5 6

1 65.00 M
1 Rp Rp
### 0
2 375.00 M
2 Rp Rp
### 0

1.000 Set Rp. –Rp 0


1.000 Set Rp. –Rp 0

4.000 psg Rp. –Rp 0


4.000 bh Rp. –Rp 0
4.000 psg Rp. –Rp 0
4.000 bh Rp. –Rp 0
4.000 bh Rp. –Rp 0
4.000 bh Rp. –Rp 0
4.000 bh Rp. –Rp 0
1.00 Rp Rp
### 0

Rp 0

6 46.88 M
3 Rp Rp
### 0
8 187.50 M
3 Rp Rp
### 0
7 318.75 M
3 Rp Rp
### 0
10 56.25 M
3 Rp Rp
### 0

Rp 0

25.00 Titik

3 28.27 M
3 Rp Rp
### 0
4 28.27 M
3 Rp Rp
### 0
5 28.27 M
3 Rp Rp
### 0

20 73.51 M
3 Rp Rp
### 0
18 11.31 M
3 Rp Rp
### 0
14 1.41 M
3 Rp Rp
### 0
75.00 Bh Rp Rp
### 0

25.00 M
1 Rp Rp
### 0
25.00 M
1 Rp Rp
### 0
25.00 M
1 Rp Rp
### 0

25.60 M
3 Rp Rp
### 0
24 64.00 M
2 Rp Rp
### 0
21 4,999.86 Kg Rp Rp
### 0

13 4.00 M
3 Rp Rp
### 0
12 9.00 M
3 Rp Rp
### 0
14 1.25 M
3 Rp Rp
### 0
Rp 0

40.95 M
3 Rp Rp
### 0
24 81.90 M
2 Rp Rp
### 0
21 2,129.86 Kg Rp Rp
### 0

14 1.72 M
3 Rp Rp
### 0

36.83 M
3 Rp Rp
### 0
24 92.07 M
2 Rp Rp
### 0
22 1,149.47 Kg Rp Rp
### 0

RAB STRUKTUR
Hal 1 dari 2

ANL VOLUME HARGA SATUAN JUMLAH HARGA

3 4 5 6

8.40 M
3 Rp 0 Rp 0
25 66.00 M
2 Rp 0 Rp 0
21 821.48 Kg Rp 0 Rp 0

68 10,872.00 Kg Rp 0 Rp 0
68 11,603.00 Kg Rp 0 Rp 0
68 5,508.00 Kg Rp 0 Rp 0
68 1,263.85 Kg Rp 0 Rp 0
68 349.28 Kg Rp 0 Rp 0
68 200.00 Kg Rp 0 Rp 0
68 782.81 Kg Rp 0 Rp 0
68 1,381.68 Kg Rp 0 Rp 0
68 912.00 Unit Rp 0 Rp 0
68 124.57 Kg Rp 0 Rp 0

Rp 0

68 10,872.00 Kg Rp 0 Rp 0
68 16,761.00 Kg Rp 0 Rp 0
68 2,830.00 Kg Rp 0 Rp 0
68 698.57 Kg Rp 0 Rp 0
68 523.93 Kg Rp 0 Rp 0
68 174.73 Kg Rp 0 Rp 0
68 363.60 Kg Rp 0 Rp 0
68 1,351.92 Kg Rp 0 Rp 0
68 240.00 Unit Rp 0 Rp 0
68 288.00 Kg Rp 0 Rp 0

21 61.65 Kg Rp 0 Rp 0

43.20 M
3 Rp 0 Rp 0
28 360.00 M
2 Rp 0 Rp 0
22 1,941.15 Kg Rp 0 Rp 0

Ls 1.00 Unit
68 1,148.72 Kg Rp 0 Rp 0
68 453.00 Kg Rp 0 Rp 0
68 26.73 Kg Rp 0 Rp 0
68 110.88 Kg Rp 0 Rp 0
68 112.00 Kg Rp 0 Rp 0
26.86 M
2 Rp 0 Rp 0

Rp 0

68 4,505.22 Kg Rp 0 Rp 0
68 53.27 Kg Rp 0 Rp 0
12.00 Bh Rp 0 Rp 0
68 361.25 Kg Rp 0 Rp 0
68 220.00 Kg Rp 0 Rp 0

Rp 0
RAB STRUKTUR
ITULASI Hal 2 dari 2

JUMLAH KETERANGAN
BOBOT ( Rp.)
(%)

3 4 5

Rp 0

Rp 0 12.98

Rp 0

Rp 0

Rp 0

Rp 0

0.00 750.00
0.00
0.00 0.00

P
buat Oleh a
ENAWAR d
……………………… a
n
g
,



MA JELAS
REKTUR

Rekap

ANL VOLUME HARGA SATUAN JUMLAH HARGA

3 4 5 6

32 68.00 M
2 Rp 0 Rp 0
16 7.39 M
3 Rp 0 Rp 0
37 116.16 M
2 Rp 0 Rp 0

Rp 0

Rp 0

32 63.00 M
2 Rp 0 Rp 0
34 96.25 M
2 Rp 0 Rp 0
37 126.00 M
2 Rp 0 Rp 0
39 192.50 M
2 Rp 0 Rp 0
42 302.57 M
2 Rp 0 Rp 0
38 140.00 M
1 Rp 0 Rp 0
21 110.97 Kg Rp 0 Rp 0

31 90.00 M
1 Rp 0 Rp 0
30 163.20 M
1 Rp 0 Rp 0
49 88.00 M
2 Rp 0 Rp 0
Ls 80.00 M
1 Rp 0 Rp 0

Rp 0
58 130.00 M
2 Rp 0 Rp 0
60 97.20 M
1 Rp 0 Rp 0
59 12.50 M
2 Rp 0 Rp 0
54 22.50 M
2 Rp 0 Rp 0

Rp 0

43 115.00 M
2 Rp 0 Rp 0
247.50 M
2 Rp 0 Rp 0
247.50 M
2 Rp 0 Rp 0
44 90.00 M
2 Rp 0 Rp 0
47 52.50 M' Rp 0 Rp 0
43 6.25 M
2 Rp 0 Rp 0
52 6.25 M' Rp 0 Rp 0

Rp 0

6.00 Unit Rp 0 Rp 0

105 186.00 M
2 Rp 0 Rp 0
99 2.00 Unit Rp 0 Rp 0
90 2.00 Unit Rp 0 Rp 0
91 1.00 Unit Rp 0 Rp 0
92 7.00 Unit Rp 0 Rp 0
95 7.00 Unit Rp 0 Rp 0
2.00 Unit Rp 0 Rp 0
74 40.30 M
2 Rp 0 Rp 0

Rp 0

64 185.87 M
2 Rp 0 Rp 0
65 278.81 M
2 Rp 0 Rp 0
65 130.00 M
2 Rp 0 Rp 0
66 181.32 M
2 Rp 0 Rp 0

Rp 0

46 45.18 M
2 Rp 0 Rp 0
44 19.82 M
2 Rp 0 Rp 0
53 28.42 M
2 Rp 0 Rp 0

RAB ARSITEKTUR
Hal 1 dari 3

ANL VOLUME HARGA SATUAN JUMLAH HARGA

3 4 5 6

108 2.00 Unit Rp 0 Rp 0


110 2.00 Unit Rp 0 Rp 0
115 10.00 Unit Rp 0 Rp 0
110 4.00 Unit Rp 0 Rp 0
119 2.00 Unit Rp 0 Rp 0
114 10.00 Unit Rp 0 Rp 0

Rp 0

Rp 0

32 63.00 M
2 Rp 0 Rp 0
34 96.25 M
2 Rp 0 Rp 0
37 126.00 M
2 Rp 0 Rp 0
39 192.50 M
2 Rp 0 Rp 0
42 270.72 M
2 Rp 0 Rp 0
38 140.00 M
1 Rp 0 Rp 0
21 110.97 Kg Rp 0 Rp 0
31 154.00 M
1 Rp 0 Rp 0
30 192.00 M
1 Rp 0 Rp 0

Rp 0

85 18.00 M
2 Rp 0 Rp 0

58 50.00 M
2 Rp 0 Rp 0
60 25.00 M
1 Rp 0 Rp 0
59 9.00 M
2 Rp 0 Rp 0

Rp 0

43 80.00 M
2 Rp 0 Rp 0
227.50 M
2 Rp 0 Rp 0
227.50 M
2 Rp 0 Rp 0

Rp 0

105 266.00 M
2 Rp 0 Rp 0
106 91.62 M
2 Rp 0 Rp 0
3.00 Unit Rp 0 Rp 0

91 1.00 Unit Rp 0 Rp 0
92 5.00 Unit Rp 0 Rp 0
90 3.00 Unit Rp 0 Rp 0
93 3.00 Unit Rp 0 Rp 0
94 4.00 Unit Rp 0 Rp 0
95 7.00 Unit Rp 0 Rp 0
99 2.00 Unit Rp 0 Rp 0
2.00 Unit Rp 0 Rp 0

Rp 0
64 97.45 M
2 Rp 0 Rp 0
65 146.18 M
2 Rp 0 Rp 0
65 60.00 M
2 Rp 0 Rp 0
66 346.20 M
2 Rp 0 Rp 0

Rp 0

46 14.40 M
2 Rp 0 Rp 0
44 51.84 M
2 Rp 0 Rp 0
53 80.64 M
2 Rp 0 Rp 0

108 2.00 Unit Rp 0 Rp 0


110 2.00 Unit Rp 0 Rp 0
115 4.00 Unit Rp 0 Rp 0
110 4.00 Unit Rp 0 Rp 0
RAB ARSITEKTUR
Hal 2 dari 3

ANL VOLUME HARGA SATUAN JUMLAH HARGA

3 4 5 6
119 2.00 Unit Rp 0 Rp 0
114 8.00 Unit Rp 0 Rp 0

Rp 0

122 525.00 M
2 Rp 0 Rp 0

126 525.00 M
2 Rp 0 Rp 0

58 90.00 M
2 Rp 0 Rp 0
60 27.00 M
1 Rp 0 Rp 0
123 27.00 M
1 Rp 0 Rp 0
125 62.00 M
1 Rp 0 Rp 0
54.00 M
1 Rp 0 Rp 0
104 2.00 Unit Rp 0 Rp 0

Rp 0

3 12.60 M
3 Rp 0 Rp 0
6 3.78 M
3 Rp 0 Rp 0

32 24.00 M
2 Rp 0 Rp 0
37 24.00 M
2 Rp 0 Rp 0
16 1.20 M
3 Rp 0 Rp 0
14 0.34 M
3 Rp 0 Rp 0

31 12.00 M
1 Rp 0 Rp 0
30 12.00 M
1 Rp 0 Rp 0
31 12.00 M
1 Rp 0 Rp 0

17 0.40 M
3 Rp 0 Rp 0
27 4.80 M
2 Rp 0 Rp 0
21 42.00 Kg Rp 0 Rp 0

32 10.80 M
2 Rp 0 Rp 0
37 76.00 M
2 Rp 0 Rp 0
16 3.60 M
3 Rp 0 Rp 0

9 20.00 M
3 Rp 0 Rp 0
10 20.00 M
3 Rp 0 Rp 0
127 100.00 M
2 Rp 0 Rp 0
129 102.82 M
1 Rp 0 Rp 0
130 25.00 M
1 Rp 0 Rp 0
10 47.25 M
3 Rp 0 Rp 0
128 100.00 M
2 Rp 0 Rp 0

12.00 Bh Rp 0 Rp 0

Rp 0
RAB ARSITEKTUR
ITULASI Hal 3 dari 3

JUMLAH KETERANGAN
BOBOT ( Rp.)
(%)

3 4 5

Rp 0 12.98

Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0

Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0

Rp 0

0.00 900.00
0.00 0.00
0.00

P
buat Oleh a
ENAWAR d
……………………… a
n
MA JELAS g
REKTUR ,

Rekap …


.
/


/
2
0
JAAN ANL VOLUME HARGA SATUAN JUMLAH HARGA 2
1
3 4 5 6

131 73.00 Ttk Rp 0 Rp 0


132 32.00 Ttk Rp 0 Rp 0
134 32.00 Bh Rp 0 Rp 0
135 5.00 Bh Rp 0 Rp 0
136 2.00 Bh Rp 0 Rp 0
137 12.00 Bh Rp 0 Rp 0
7.00 Bh Rp 0 Rp 0
16.00 Bh Rp 0 Rp 0
50.00 Bh Rp 0 Rp 0
131 53.00 Ttk Rp 0 Rp 0
132 28.00 Ttk Rp 0 Rp 0
134 28.00 Ttk Rp 0 Rp 0
135 5.00 Ttk Rp 0 Rp 0
136 2.00 Ttk Rp 0 Rp 0
137 8.00 Ttk Rp 0 Rp 0
3.00 Bh Rp 0 Rp 0
14.00 Bh Rp 0 Rp 0
36.00 Bh Rp 0 Rp 0

Rp 0

35mm 15.00 M
1 Rp 0 Rp 0
15.00 M
1 Rp 0 Rp 0
4x6 mm 15.00 M
1 Rp 0 Rp 0

6.00 M
1 Rp 0 Rp 0
6.00 M
1 Rp 0 Rp 0
6.00 M
1 Rp 0 Rp 0

25.00 M
1 Rp 0 Rp 0

Rp 0

1.00 Unit Rp 0 Rp 0
138 1.00 Unit Rp 0 Rp 0
138 1.00 Unit Rp 0 Rp 0

Rp 0

Roof Tan 142 25.00 M


1 Rp 0 Rp 0
1.00 Unit Rp 0 Rp 0
140 30.00 M
1 Rp 0 Rp 0
141 20.40 M
1 Rp 0 Rp 0
142 25.00 M
1 Rp 0 Rp 0
143 30.00 M
1 Rp 0 Rp 0
140 60.00 M
1 Rp 0 Rp 0
1.00 Unit Rp 0 Rp 0
20.00 Unit Rp 0 Rp 0
146 10.00 Unit Rp 0 Rp 0

Rp 0
RAB_ME
ITULASI Hal 1 dari 1

JUMLAH KETERANGAN
BOBOT ( Rp.)
(%)

3 4 5

Rp 0 12.98

Rp 0

Rp 0

Rp 0

0.00 900.00
0.00 0.00
0.00
P
buat Oleh a
ENAWAR d
……………………… a
n
MA JELAS g
REKTUR ,

kap_ME …

CANA ANGGARAN BIAYA …
.
/


JUMLAH KETERANGAN /
BOBOT ( Rp.) 2
(%) 0
2
1
3 4 5

Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0

Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0
Rp 0

Rp 0

0.00
0.00
10% Rp. –
Rp. – 5,989,500,000.00
Rp. – 5,989,500,000.00

P
buat Oleh a
ENAWAR d
……………………… a
n
MA JELAS g
REKTUR ,

kapitulasi …

T I M E S C H E …
.
/


/
2
0
2
1
W
START
D
0 1 2 3 4 5 6 7 8
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PENAWAR
PT/CV……………………………

NAMA JELAS
DIREKTUR

1
BAHAN JUMLAH

5 6


– Rp. –
Rp. –
Rp. –

– Rp. –
Rp. –
Rp. –

Rp. –
Rp. –
Rp. –

Rp. –
Rp. –
Rp. –
Rp. –
Rp. –
Rp. –

Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –

– Rp. –
Rp. –
Rp. –

Hal 1 dari 19

BAHAN JUMLAH

5 6



– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –





– Rp. –
Rp. –
Rp. –

Hal 2 dari 19

BAHAN JUMLAH

5 6





– Rp. –
Rp. –
Rp. –





– Rp. –
Rp. –
Rp. –





– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –
Rp. –



– Rp. –
– Rp. –
Rp. –
Rp. –




– Rp. –
– Rp. –

Hal 3 dari 19

BAHAN JUMLAH

5 6
Rp. –
Rp. –






– Rp. –
– Rp. –
Rp. –
Rp. –







– Rp. –
– Rp. –
Rp. –
Rp. –







– Rp. –
– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –







– Rp. –
– Rp. –
Rp. –
Rp. –





Hal 4 dari 19

BAHAN JUMLAH

5 6


– Rp. –
Rp. –
Rp. –








– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –

Hal 5 dari 19

BAHAN JUMLAH

5 6


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –

Hal 6 dari 19

BAHAN JUMLAH

5 6




– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –





– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –

Hal 7 dari 19

BAHAN JUMLAH

5 6



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –












– Rp. –
Rp. –
Rp. –


Hal 8 dari 19
BAHAN JUMLAH

5 6






– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


Hal 9 dari 19

BAHAN JUMLAH

5 6
– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –





– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –
Hal 10 dari 19

BAHAN JUMLAH

5 6


– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –

– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –

Hal 11dari 19
BAHAN JUMLAH

5 6


– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –





– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –






Rp. –



Rp. –




Hal 12 dari 19

BAHAN JUMLAH

5 6


Rp. –






Rp. –



Rp. –



Rp. –






Rp. –






Rp. –






Rp. –







Rp. –




Rp. –









Rp. –






Hal 13 dari 19

BAHAN JUMLAH

5 6


Rp. –










Rp. –










Rp. –


Rp. –




Rp. –




Rp. –



Rp. –


Rp. –






– Rp. –
Rp. –
Rp. –
Rp. –








– Rp. –
Rp. –
Rp. –
Rp. –


Hal 14 dari 19

BAHAN JUMLAH
5 6


Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –




– Rp. –
Rp. –
Rp. –

– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –

Hal 15 dari 19

BAHAN JUMLAH

5 6


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –

Rp. –

Rp. –

Rp. –



Rp. –
Rp. –
Rp. –
Rp. –
Rp. –





Rp. –
Rp. –
Rp. –



Rp. –



Rp. –


– Rp. –
Rp. –
Rp. –

Hal 16 dari 19

BAHAN JUMLAH

5 6


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –



– Rp. –
Rp. –
Rp. –


– Rp. –
Rp. –
Rp. –

Hal 17 dari 19
AHAN JUMLAH

5 6

0
0
0
0
0
0

0 Rp 0
Rp 0
Rp 0

0
0
0
0
0
0

0 Rp 0
Rp 0
Rp 0

0
0

0 Rp 0
Rp 0
Rp 0
0
0

0 Rp 0
Rp 0
Rp 0

0
0

0 Rp 0
Rp 0
Rp 0

0
0

0 Rp 0
Rp 0
Rp 0

0
0

0 Rp 0
Rp 0
Rp 0

0
0
0
0
0
0
0
0
0
0
0

0 Rp 0
Rp 0
Rp 0

Hal 18 dari 19

AHAN JUMLAH

5 6
0
0

0 Rp 0
Rp 0
Rp 0

0
0
0

0 Rp 0
Rp 0
Rp 0

0
0
0

0 Rp 0
Rp 0
Rp 0

0
0
0

0 Rp 0
Rp 0
Rp 0

0
0
0

0 Rp 0
Rp 0
Rp 0

0
0
0

0 Rp 0
Rp 0
Rp 0

0
0
0
0 Rp 0
Rp 0
Rp 0

0
0
0

0 Rp 0
Rp 0
Rp 0

Hal 19 dari 19
1 dari 3
2 dari 3
3 dari 3
AH HARGA

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0

0
0
0
0
0
0
0
0
0
0

ari 1
C H E D U L E

WAKTU PELAKSANAAN
MINGGU KE-
8 9 10 11 12 13 14 15 16 17
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NAWAR
……………………

A JELAS
REKTUR

1
KETERANGAN
18 19 20 21

0.0

0.0

0.0

0.0

0.0

0.0

0.0 SKALA
0.0
SKALA

0.0

0.0

0.0

0.0

0.0

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

Padang,…………./……/2021