A TENAGA
Pekerja L.01 OH 0.15 145,000.00 21,750.00
Tukang Kayu L.02 OH 0.15 160,000.00 24,000.00
Kepala tukang L.03 OH 0.015 175,000.00 2,625.00
Mandor L.12 OH 0.008 200,000.00 1,600.00
JUMLAH TENAGA KERJA 49,975.00
B BAHAN
Lantai vynil motif kayu tb. 3mm BH 8.14 27,000.00 219,780.00
Lem Kg 0.35 79,000.00 27,650.00
JUMLAH HARGA BAHAN 247,430.00
C PERALATAN
-
JUMLAH HARGA ALAT -