Anda di halaman 1dari 8

Analisa Harga Satuan Pekerjaan Keramik

Lantai Dan Dinding


June 02, 2021 4 comments
HARG SUB. JUMLAH JUMLA
A (Rp) H
N SATU
URAIAN KOEF. SATU (Rp)
o AN
AN
(Rp)
PEKERJAAN KERAMIK LANTAI DAN DINDING

1. 1 m² Pasang
Lantai
Keramik
Ukuran (30 x
30) cm---
Polished setara
Roman M2 1.05 1,100,00 115,500

Bahan : kg 10 1,000 10,000


- Keramik uk. m³ 0.045 1.500 265,000 11,925
30x30cm kg 18,870. 28,305
polished 00
- PC 0.700
- PP org/hr 0.350 110,350.10
- Semen org/hr 0.035 157,643 58,355.15
Warna org/hr 0.035 166,729 6,393.66
org/hr 182,676 6,799.59
Tenaga Kerja : 194,274
- Pekerja
- Tukang Batu
- Kepala
Tukang
- Mandor

347,628.
Jumlah Harga :
50
Keuntungan 10% :
347,628.
Jumlah Harga :
50

2. 1 m² Pasang
Lantai
Keramik
Ukuran (30 x
30) cm---
Unpolished
setara Roman M2 1.05 119,000 124,950

Bahan :
- Keramik uk. kg 10 1,000 10,000
30x30cm m³ 0.045 1.500 265,000 11,925
Unpolished/A kg 18,870. 28,305
nti slip 00
- PC
- PP 0.700
- Semen org/hr 0.350 110,350.10
Warna org/hr 0.035 157,643 58,355.15
org/hr 0.035 166,729 6,393.66
org/hr 182,676 6,799.59
Tenaga Kerja : 194,274
- Pekerja
- Tukang Batu
- Kepala
Tukang
- Mandor

357,078.
Jumlah Harga :
50
Keuntungan 10% :
357,078.
Jumlah Harga :
50

3. 1 m² Pasang
Lantai
Keramik
Ukuran (20 x
20) cm ---
Polished/Glaze
d setara M2 1.05 122,600 128,730
Roman Gol. B

Bahan :
- Keramik uk. kg 10.400 0.045 1,000 10,400
20x20cm m³ 1.620 265,000 11,925
Polished/Glaz kg 18,870. 30,569.40
ed 00
- PC
- PP 0.700
- Semen org/hr 0.350 110,350.10
Warna org/hr 0.035 157,643 58,355.15
org/hr 0.035 166,729 6,393.66
org/hr 182,676 6,799.59
Tenaga Kerja : 194,274
- Pekerja
- Tukang Batu
- Kepala
Tukang
- Mandor

363,522.
Jumlah Harga :
90
Keuntungan 10% :
363,522.
Jumlah Harga :
90

4. 1 m² Pasang
Lantai
Keramik
Ukuran (20 x
20) cm ---
Unpolished/An
ti slip setara M2 1.05 122,000 128,100
Roman Gol. B

Bahan :
- Keramik uk. kg 10.400 0.045 1,000 10,400
20x20cm m³ 1.620 265,000 11,925
Polished/Glaz kg 18,870. 30,569.40
ed 00
- PC 0.700
- PP org/hr 0.350 110,350.10
- Semen org/hr 0.035 157,643 58,355.15
Warna org/hr 0.035 166,729 6,393.66
org/hr 182,676 6,799.59
Tenaga Kerja : 194,274
- Pekerja
- Tukang Batu
- Kepala
Tukang
- Mandor

362,892.
Jumlah Harga :
90
Keuntungan 10% :
362,892.
Jumlah Harga :
90

5. 1 m² Pasang
Lantai
keramaik
Ukuran (40 x
40) cm---
Polished setara
Roman Gol. B M2 1.061 105,000 111,384
Bahan :
- Keramik uk. kg 12.250 0.045 1,000 12,250
40x40cm m³ 1.300 265,000 11,925
polished/Glaz kg 18,870. 24,531
ed 00
- PC 0.700
- PP org/hr 0.350 110,350.10
- Semen org/hr 0.035 157,643 58,355.15
Warna org/hr 0.035 166,729 6,393.66
org/hr 182,676 6,799.59
Tenaga Kerja : 194,274
- Pekerja
- Tukang Batu
- Kepala
Tukang
- Mandor

341,988.
Jumlah Harga :
50
Keuntungan 10% :
341,988.
Jumlah Harga :
50

6. 1 m² Pasang
Lantai keramik
Ukuran (60 x
60) cm---
Polished setara
Roman
M2 1.080 186,000 200,880
Bahan :
- Keramik uk.
60x60cm kg 9.600 0.045 1,000 9,600
polished/Glaz m³ 1.500 265,000 11,925
ed kg 18,870. 28,305
- PC 00
- PP
- Semen 0.240 0.120
Warna org/hr 0.012 0.012 37,834.32
org/hr 157,643 20,007.48
org/hr 166,729 2,192.11
Tenaga Kerja : org/hr 182,676 2,331.29
- Pekerja 194,274
- Tukang Batu
- Kepala
Tukang
- Mandor
313,075.
Jumlah Harga :
20
Keuntungan 10% :
313,075.
Jumlah Harga :
20

7. 1 m² Pasang
Lantai keramik
Ukuran (60 x
60) cm---
Unpolished
setara Roman
M2 1.080 186,000 200,880
Bahan :
- Keramik uk.
60x60cm kg 8.140 0.045 1,000 8,140
polished/Glaz m³ 1.620 265,000 11,925
ed kg 18,870. 30,569.40
- PC 00
- PP
- Semen 0.240 0.120
Warna org/hr 0.012 0.012 37,834.32
org/hr 157,643 20,007.48
org/hr 166,729 2,192.11
Tenaga Kerja : org/hr 182,676 2,331.29
- Pekerja 194,274
- Tukang Batu
- Kepala
Tukang
- Mandor

326,796.
Jumlah Harga :
40
Keuntungan 10% :
326,796.
Jumlah Harga :
40

8. 1 m² Pasang
Dinding
Keramik
Ukuran (20 x
20) cm---
Polished setara
Roman Gol. B M2 1.050 122,600 128,730

Bahan : kg 9.300 0.018 1,000 9,300


- Keramik m³ 1.940 265,000 4,770
Ukuran (20 x kg 18,870. 36,607.80
20) cm 00
Roman
- PC
- PP
- Semen 0.900 0.450
Warna org/hr 0.450 0.450 141,878.70
org/hr 157,643 75,028.05
org/hr 166,729 8,220.42
org/hr 182,676 8,742.33
194,274
Tenaga Kerja :
- Pekerja
- Tukang Batu
- Kepala
Tukang
- Mandor

413,277.
Jumlah Harga :
30
Keuntungan 10% :
413,277.
Jumlah Harga :
30

9. 1 m² Pasang
Dinding
Keramik
Ukuran (20 x
25) cm ---
Polished setara M2
Roman Gol. B 1.050 115,400 121,170
kg
Bahan : m³ 9.300 0.045 1,000 9,300
- Keramik kg 1.940 265,000 11,925 36,607.80
Ukuran (20 x 18,870.
25) cm 00
Roman
- PC
- PP
- Semen org/hr 0.900 0.450 141,878.70
Warna org/hr 0.450 0.450 75,028.05
org/hr 157,643 8,220.42
org/hr 166,729 8,742.33
182,676
194,274
Tenaga Kerja :
- Pekerja
- Tukang Batu
- Kepala
Tukang
- Mandor
412,872.
Jumlah Harga :
30
Keuntungan 10% :
412,872.
Jumlah Harga :
30

1 1 m² Pasang
0. Dinding
Keramik
Ukuran (20 x
40) cm---
Polished setara
Roman Gol. B M2 1.050 104,000 109,200

Bahan : kg 9.300 0.045 1,000 9,300


- Keramik m³ 1.552 265,000 11,925
Ukuran (20 x kg 18,870. 29,286.24
40) cm, 00
Roman 0.900 0.450
- PC org/hr 0.450 0.450 141,878.70
- PP org/hr 157,643 75,028.05
- Semen org/hr 166,729 8,220.42
Warna org/hr 182,676 8,742.33
194,274
Tenaga Kerja :
- Pekerja
- Tukang Batu
- Kepala
Tukang
- Mandor

393,580.
Jumlah Harga :
74
Keuntungan 10% :
393,580.
Jumlah Harga :
74

1 1 m² Pasang
1. Dinding
Keramik
Ukuran (30 x
30 ) cm ---
Polished setara
Roman M2 1.050 95,000 99,750

Bahan : kg 9.300 0.045 1,000 9,300


- Keramik m³ 1.552 265,000 11,925
Ukuran (30 x kg 18,870. 29,286.24
30) cm 00
- PC 0.900 0.450
- PP org/hr 0.450 0.450 141,878.70
- Semen org/hr 157,643 75,028.05
Warna org/hr 166,729 8,220.42
org/hr 182,676 8,742.33
Tenaga Kerja : 194,274
- Pekerja
- Tukang Batu
- Kepala
Tukang
- Mandor

384,130.
Jumlah Harga :
74
Keuntungan 10% :
384,130.
Jumlah Harga :
74

1 1 m²
2. Pekerjaan
Pemasangan
Keramik
Dinding
Ukuran.30x60
cm/Roman/Pol
ised M2 1.060 160,000 169,600

Bahan : kg 9.600 0.018 1,000 9,600


- Keramik uk. m³ 0.970 265,000 4,770
30x60cm kg 18,870. 18,303.90
- PC 00
- PP 0.900 0.450
- Semen org/hr 0.450 0.450 141,878.70
Warna org/hr 157,643 75,028.05
org/hr 166,729 8,220.42
Tenaga Kerja : org/hr 182,676 8,742.33
- Pekerja 194,274
- Tukang Batu
- Kepala
Tukang
- Mandor

436,143.
Jumlah Harga :
40
Keuntungan 10% :
436,143.
Jumlah Harga :
40

Anda mungkin juga menyukai