Anda di halaman 1dari 1

Analisa Harga Satuan Pekerjaan Pasangan

Pemasangan 1m² ' Homogenous Tiles Mat HT-23D (warna light beige) dSafari Tan ukuran 600 x 300 mm, ex Roman Granit, termasuk screed dan nad.

No Uraian Kode Satuan Koefisien Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.7000 100,000.00 70,000.00
Tukang Batu L.02 OH 0.3500 150,000.00 150,000.00
Kepala Tukang L.03 OH 0.0350 200,000.00 7,000.00
Mandor L.04 OH 0.0300 178,431.13 5,352.93
JUMLAH TENAGA KERJA 232,352.93
B BAHAN
Homgenous tiles ex. roman dSafari 600x300 matt bh 3.0000 72800 218,400.00
Semen Portlan Kg 10.0000 1,656.00
Pasir Pasang m³ 0.0450 250,000.00 16,560.00
Lemkra Fs103 kg 1.5000 21,600.00 32,400.00
JUMLAH HARGA BAHAN 267,360.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 499,712.93
E Overhead & Profit 10% x D 49,971.29
F Harga Satuan Pekerjaan (D+E) 549,684.23
Pemasangan 1m² Homogenous Tiles Mat HT-17D (warna Light beige) dShibuya Sand Series ukuran 600 x 600 mm ex Roman Granit, termasuk screed dan nad.

No Uraian Kode Satuan Koefisien Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.7000 159,431.13 111,601.79
Tukang Batu L.02 OH 0.3500 163,431.13 163,431.13
Kepala Tukang L.03 OH 0.0350 179,431.13 6,280.09
Mandor L.04 OH 0.0300 178,431.13 5,352.93
JUMLAH TENAGA KERJA 286,665.94
B BAHAN
Homgenous tiles ex. roman dShibuya Sand 600x600 bh 3.0000 56983.33333 170,950.00
Semen Portlan Kg 10.0000 1,656.00 16,560.00
Pasir Pasang m³ 0.0450 250,000.00 11,250.00
Lemkra Fs103 kg 1.5000 21,600.00 32,400.00
JUMLAH HARGA BAHAN 231,160.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 517,825.94
E Overhead & Profit 10% x D 51,782.59
F Harga Satuan Pekerjaan (D+E) 569,608.54
Pemasangan 1m² Homogenous Tiles Mat HT-20D (warna beige) dChicago beige ukuran 600 x 600 mm ex Roman Granit,, termasuk screed dan nad. 90344.54033
No Uraian Kode Satuan Koefisien Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.7000 159,431.13 111,601.79
Tukang Batu L.02 OH 0.3500 163,431.13 163,431.13
Kepala Tukang L.03 OH 0.0350 179,431.13 6,280.09
Mandor L.04 OH 0.0300 178,431.13 5,352.93
JUMLAH TENAGA KERJA 286,665.94
B BAHAN
Homgenous tiles ex. roman dChicago biege 600x600 bh 3.0000 56966.66667 170,900.00
Semen Portlan Kg 10.0000 1,656.00 16,560.00
Pasir Pasang m³ 0.0450 250,000.00 11,250.00
Lemkra Fs103 kg 1.5000 21,600.00 32,400.00
JUMLAH HARGA BAHAN 231,110.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 517,775.94
E Overhead & Profit 10% x D 51,777.59
F Harga Satuan Pekerjaan (D+E) 569,553.54

Anda mungkin juga menyukai