Anda di halaman 1dari 120

ANALISA HARGA SATUAN PEKERJAAN

" LAMPIRAN PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NO. 28 TAHUN 2016 - BIDANG CIPTA KARYA "

A. 2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.2. (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 m'
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang kayu L.02 OH 0.400 110,000.00 44,000.00
Kepala tukang L.03 OH 0.020 112,500.00 2,250.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 67,650.00
B BAHAN
Dolken kayu dia. 8-10 / 400 cm Btg 1.250 34,000.00 42,500.00
Semen portland Kg 2.500 1,020.00 2,550.00
Seng gelombang 3 inci - 5 inci Lbr 1.200 108,200.00 129,840.00
Pasir beton m3 0.005 346,000.00 1,730.00
Koral beton m3 0.009 162,400.00 1,461.60
Kayu 5/7, Klas III m3 0.072 2,700,000.00 194,400.00
Paku biasa 2” – 5” Kg 0.060 26,300.00 1,578.00
Meni besi Ltr 0.450 67,000.00 30,150.00
JUMLAH BAHAN 404,209.60
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 471,859.60


E Overhead & Profit 15% x D 70,778.94
F Harga Satuan Pekerjaan (D+E) 542,638.54
A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 112,500.00 1,125.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 22,225.00
B BAHAN
Kayu balok 5/7 Kelas IV m3 0.012 1,890,600.00 22,687.20
Paku 2”-3” Kg 0.020 16,700.00 334.00
Kayu papan 3/20 III m3 0.007 1,890,600.00 13,234.20
JUMLAH BAHAN 36,255.40
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 58,480.40


E Overhead & Profit 15% x D 8,772.06
F Harga Satuan Pekerjaan (D+E) 67,252.46
A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 2.000 95,000.00 190,000.00
Tukang kayu L.02 OH 2.000 110,000.00 220,000.00
Tukang batu L.02 OH 1.000 110,000.00 110,000.00
Kepala tukang L.03 OH 0.300 112,500.00 33,750.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 559,750.00
B BAHAN
Dolken kayu diameter 8-10 / 400 cm Batang 1.250 34,000.00 42,500.00
Kayu Kelas III m3 0.180 2,426,600.00 436,788.00
Paku biasa Kg 0.080 16,700.00 1,336.00
Besi strip Kg 1.100 12,100.00 13,310.00
Semen Portland Kg 35.000 1,020.00 35,700.00
Pasir pasang m3 0.150 300,000.00 45,000.00
Pasir beton m3 0.100 250.00 25.00
Koral beton m3 0.150 162,400.00 24,360.00
Bata merah Bh 30.000 1,000.00 30,000.00
Seng pelat Lembar 0.250 70,000.00 17,500.00
Jendela naco Bh 0.200 -
Kaca polos m2 0.080 104,400.00 8,352.00
Kunci tanam Bh 0.150 90,300.00 13,545.00
Polywood 4 mm Lembar 0.060 82,800.00 4,968.00
JUMLAH BAHAN 673,384.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 1,233,134.00


E Overhead & Profit 15% x D 184,970.10
F Harga Satuan Pekerjaan (D+E) 1,418,104.10
A. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 -
Tukang kayu L.02 OH 2.000 -
Kepala tukang L.03 OH 0.200 -
Mandor L.04 OH 0.050 -
JUMLAH TENAGA KERJA -
B BAHAN
Dolken kayu diameter 8-10 / 400 cm Batang 1.700 -
Kayu Kelas III m3 0.210 -
Paku biasa Kg 0.300 -
Semen Portland Kg 10.500 -
Pasir beton m3 0.030 -
Koral beton m3 0.050 -
Seng gelombang Lembar 1.500 -
Seng pelat Lembar 0.250 -
JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) -
E Overhead & Profit 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 95,000.00 9,500.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 15,500.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 15,500.00


E Overhead & Profit 15% x D 2,325.00
F Harga Satuan Pekerjaan (D+E) 17,825.00
A. 2.3.1. HARGA SATUAN PEKERJAAN TANAH
A. 2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 2 m
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.900 95,000.00 85,500.00
Mandor L.04 OH 0.450 120,000.00 54,000.00
JUMLAH TENAGA KERJA 139,500.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 139,500.00


E Overhead & Profit 15% x D 20,925.00
F Harga Satuan Pekerjaan (D+E) 160,425.00
A. 2.3.1.9. Pengurugan kembali 1 m3 galian tanah
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Mandor L.04 OH 0.150 120,000.00 18,000.00
JUMLAH TENAGA KERJA 46,500.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 46,500.00


E Overhead & Profit 15% x D 6,975.00
F Harga Satuan Pekerjaan (D+E) 53,475.00
A. 2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm)
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 95,000.00 47,500.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 53,500.00


E Overhead & Profit 15% x D 8,025.00
F Harga Satuan Pekerjaan (D+E) 61,525.00
A. 2.3.1.10.a Pengurugan 1m3 Tanah Dipadatkan
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 95,000.00 47,500.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Tanah urug m3 1.200 45,000.00 54,000.00
JUMLAH BAHAN 54,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 107,500.00


E Overhead & Profit 15% x D 16,125.00
F Harga Satuan Pekerjaan (D+E) 123,625.00
A. 2.3.1.11. Pengurugan 1 m3 dengan pasir urug
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 29,700.00
B BAHAN
Pasir urug m3 1.200 110,400.00 132,480.00
JUMLAH BAHAN 132,480.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 162,180.00


E Overhead & Profit 15% x D 24,327.00
F Harga Satuan Pekerjaan (D+E) 186,507.00
A. 3.2.1 HARGA SATUAN PEKERJAAN PONDASI BATU KALI
A. 3.2.1.2. Pemasangan 1 m3 pondasi batu kali campuran 1SP : 4PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.500 95,000.00 142,500.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 112,500.00 8,437.50
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 242,437.50
B BAHAN
Batu kali 15/20 cm m3 1.200 268,000.00 321,600.00
Semen Portland Kg 163.000 1,020.00 166,260.00
Pasir pasang m3 0.520 300,000.00 156,000.00
JUMLAH BAHAN 643,860.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 886,297.50


E Overhead & Profit 15% x D 132,944.63
F Harga Satuan Pekerjaan (D+E) 1,019,242.13
A. 3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.780 95,000.00 74,100.00
Tukang batu L.02 OH 0.390 110,000.00 42,900.00
Kepala tukang L.03 OH 0.039 112,500.00 4,387.50
Mandor L.04 OH 0.039 120,000.00 4,680.00
JUMLAH TENAGA KERJA 126,067.50
B BAHAN
Batu kali m3 1.200 268,000.00 321,600.00
Pasir urug m3 0.432 110,400.00 47,692.80
JUMLAH BAHAN 369,292.80
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 495,360.30


E Overhead & Profit 15% x D 74,304.05
F Harga Satuan Pekerjaan (D+E) 569,664.35
A. 4.1.1 HARGA SATUAN PEKERJAAN BETON
A. 4.1.6.12 Membuat 1m3 beton mutu f'c = 31,2 Mpa (K 350), slump (12 2) cm, w/c = 0.48
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 2.100 95,000.00 199,500.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 112,500.00 3,937.50
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 254,537.50
B BAHAN
Semen Portland Kg 448.00 1,020.00 456,960.00
Pasir Beton Kg 667.00 250.00 166,750.00
Kerikil (maks. 30 mm)] Kg 1,000.00 200.00 200,000.00
Air Ltr 215.00 18.00 3,870.00
JUMLAH BAHAN 827,580.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 1,082,117.50


E Overhead & Profit 15% x D 162,317.63
F Harga Satuan Pekerjaan (D+E) 1,244,435.13
A. 4.1.6.13 Pembesian 1 kg dengan besi polos atau besi ulir
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.07 95,000.00 6,650.00
Tukang besi L.02 OH 0.07 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 112,500.00 787.50
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 15,617.50
B BAHAN
Besi beton (polos/ulir) Kg 10.500 16,800.00 176,400.00
Kawat beton Kg 0.150 17,100.00 2,565.00
JUMLAH BAHAN 178,965.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 194,582.50


E Overhead & Profit 15% x D 29,187.38
F Harga Satuan Pekerjaan (D+E) 22,376.99
A. 4.1.6.14 Pemasangan 1 m2 bekisting untuk pondasi
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.520 95,000.00 49,400.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 112,500.00 2,925.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 84,045.00
B BAHAN
Kayu kelas III m3 0.040 2,426,600.00 97,064.00
Paku 5-10 cm Kg 0.300 16,700.00 5,010.00
Minyak bekisting Ltr 0.100 13,800.00
JUMLAH BAHAN 102,074.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 186,119.00


E Overhead & Profit 15% x D 27,917.85
F Harga Satuan Pekerjaan (D+E) 214,036.85
A. 4.1.6.15 Pemasangan 1 m2 bekisting untuk sloof
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.520 95,000.00 49,400.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 112,500.00 2,925.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 84,045.00
B BAHAN
Kayu kelas III m3 0.045 2,426,600.00 109,197.00
Paku 5-10 cm Kg 0.300 16,700.00 5,010.00
Minyak bekisting Ltr 0.100 13,800.00
JUMLAH BAHAN 114,207.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 198,252.00


E Overhead & Profit 15% x D 29,737.80
F Harga Satuan Pekerjaan (D+E) 227,989.80
A. 4.1.6.16 Pemasangan 1 m2 bekisting untuk kolom
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 95,000.00 62,700.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 112,500.00 3,712.50
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 106,672.50
B BAHAN
Kayu kelas III m3 0.040 2,426,600.00 97,064.00
Balok kayu kelas II m3 0.015 3,029,100.00 45,436.50
Plywood tebal 9 mm Lbr 0.350 123,000.00 43,050.00
Dolken kayu 8-10 cm panjang 4 cm batang 2.000 22,000.00 44,000.00
Paku 5-12 cm Kg 0.400 16,700.00 6,680.00
Minyak bekisting Ltr 0.200 13,800.00 2,760.00
JUMLAH BAHAN 236,230.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 342,903.00


E Overhead & Profit 15% x D 51,435.45
F Harga Satuan Pekerjaan (D+E) 394,338.45
A. 4.1.6.17 Pemasangan 1 m2 bekisting untuk balok
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 95,000.00 62,700.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 112,500.00 3,712.50
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 106,672.50
B BAHAN
Kayu kelas III m3 0.040 2,426,600.00 97,064.00
Balok kayu kelas II m3 0.015 3,029,100.00 45,436.50
Plywood tebal 9 mm Lbr 0.350 123,000.00 43,050.00
Dolken kayu 8-10 cm panjang 4 cm batang 2.000 22,000.00 44,000.00
Paku 5-12 cm Kg 0.400 16,700.00 6,680.00
Minyak bekisting Ltr 0.200 13,800.00 2,760.00
JUMLAH BAHAN 236,230.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 342,903.00


E Overhead & Profit 15% x D 51,435.45
F Harga Satuan Pekerjaan (D+E) 394,338.45
A. 4.1.6.18 Pemasangan 1 m2 bekisting untuk plat lantai
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 95,000.00 62,700.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 112,500.00 3,712.50
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 106,672.50
B BAHAN
Kayu kelas III m3 0.040 2,426,600.00 97,064.00
Balok kayu kelas II m3 0.015 3,029,100.00 45,436.50
Plywood tebal 9 mm Lbr 0.350 123,000.00 43,050.00
Dolken kayu 8-10 cm panjang 4 cm batang 2.000 22,000.00 44,000.00
Paku 5-12 cm Kg 0.400 16,700.00 6,680.00
Minyak bekisting Ltr 0.200 13,800.00 2,760.00
JUMLAH BAHAN 236,230.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 342,903.00


E Overhead & Profit 15% x D 51,435.45
F Harga Satuan Pekerjaan (D+E) 394,338.45
A. 4.1.6.19 Pemasangan 1 m2 bekisting untuk dinding
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 95,000.00 62,700.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 112,500.00 3,712.50
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 106,672.50
B BAHAN
Kayu kelas III m3 0.040 2,426,600.00 97,064.00
Balok kayu kelas II m3 0.015 3,029,100.00 45,436.50
Plywood tebal 9 mm Lbr 0.350 123,000.00 43,050.00
Dolken kayu 8-10 cm panjang 4 cm batang 2.000 22,000.00 44,000.00
Paku 5-12 cm Kg 0.400 16,700.00 6,680.00
Penjaga jarak bekisting/spacer Bh 4.000 19,500.00 78,000.00
Minyak bekisting Ltr 0.200 13,800.00 2,760.00
JUMLAH BAHAN 236,230.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 342,903.00


E Overhead & Profit 15% x D 51,435.45
F Harga Satuan Pekerjaan (D+E) 394,338.45
A. 4.1.6.20 Pemasangan 1 m2 bekisting untuk tangga
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.660 95,000.00 62,700.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 112,500.00 3,712.50
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 106,672.50
B BAHAN
Kayu kelas III m3 0.030 2,426,600.00 72,798.00
Balok kayu kelas II m3 0.015 3,029,100.00 45,436.50
Plywood tebal 9 mm Lbr 0.350 123,000.00 43,050.00
Dolken kayu 8-10 cm panjang 4 cm batang 2.000 22,000.00 44,000.00
Paku 5-12 cm Kg 0.400 16,700.00 6,680.00
Minyak bekisting Ltr 0.150 13,800.00 2,070.00
JUMLAH BAHAN 211,964.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 318,637.00


E Overhead & Profit 15% x D 47,795.55
F Harga Satuan Pekerjaan (D+E) 366,432.55
A. 4.1.6.21 Pemasangan 1 Kg jaring kawat baja/wire mesh
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.025 95,000.00 2,375.00
Tukang besi L.02 OH 0.025 110,000.00 2,750.00
Kepala tukang L.03 OH 0.002 112,500.00 225.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 5,470.00
B BAHAN
Jaring kawat baja dilas Kg 1.020 26,200.00 26,724.00
Kawat beton Kg 0.050 17,100.00 855.00
JUMLAH BAHAN 27,579.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 33,049.00


E Overhead & Profit 15% x D 4,957.35
F Harga Satuan Pekerjaan (D+E) 38,006.35
A. 5.1.1 HARGA
Memasang SATUAN
1 m2 PEKERJAAN DINDING
A. 5.1.6.3 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata,
campuran spesi 1 PC : 4 PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.600 95,000.00 57,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 112,500.00 2,250.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 84,850.00
B BAHAN
Semen Portland Kg 26.550 1,020.00 27,081.00
Pasir Pasang M3 0.093 300,000.00 27,900.00
Bata merah Bh 140.000 900.00 126,000.00
JUMLAH BAHAN 180,981.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 265,831.00


E Overhead & Profit 15% x D 39,874.65
F Harga Satuan Pekerjaan (D+E) 305,705.65
A. 5.1.6.4 Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 112,500.00 1,687.50
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 48,487.50
B BAHAN
Semen Portland Kg 6.240 1,020.00 6,364.80
Pasir Pasang M3 0.024 300,000.00 7,200.00
JUMLAH BAHAN 13,564.80
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 62,052.30


E Overhead & Profit 15% x D 9,307.85
F Harga Satuan Pekerjaan (D+E) 71,360.15
A. 5.1.6.5 Membuat 1 m2 acian
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.200 95,000.00 19,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 112,500.00 1,125.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 32,325.00
B BAHAN
Semen Portland Kg 3.250 1,020.00 3,315.00
JUMLAH BAHAN 3,315.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 35,640.00


E Overhead & Profit 15% x D 5,346.00
F Harga Satuan Pekerjaan (D+E) 40,986.00
Memasang 1 m2
A. 5.1.6.17
dinding HB/CB 20, campuran spesi 1 PC : 4 PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.350 95,000.00 33,250.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 112,500.00 1,687.50
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 53,597.50
B BAHAN
Semen Portland Kg 24.260 1,020.00 24,745.20
Pasir Pasang m3 0.772 300,000.00 231,600.00
Besi angkur φ =8 mm Kg 0.280
HB 20 Bh 12.500 -
JUMLAH BAHAN 256,345.20
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 309,942.70


E Overhead & Profit 15% x D 46,491.41
F Harga Satuan Pekerjaan
Memasang 1 m2 (D+E) 356,434.11
A. 5.1.6.23 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran
spesi 1 PC : 4 PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 112,500.00 1,125.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 42,425.00
B BAHAN
Semen Portland Kg 11.000 -
Pasir Pasang m3 0.035 -
Roster Bh 30.000 -
JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 42,425.00


E Overhead & Profit 15% x D 6,363.75
F Harga Satuan Pekerjaan
Memasang 1 m2 (D+E) 48,788.75
A. 5.1.6.24 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm,
campuran spesi 1 PC : 3 PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 112,500.00 1,687.50
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 48,487.50
B BAHAN
Semen Portland Kg 14.000 1,020.00 14,280.00
Pasir Pasang m3 0.032 300,000.00 9,600.00
Bata ekspose Bh 70.000 2,500.00 175,000.00
JUMLAH BAHAN 198,880.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 247,367.50


E Overhead & Profit 15% x D 37,105.13
F Harga Satuan Pekerjaan
Memasang 1 m2 (D+E) 284,472.63
A. 5.1.6.25 dinding batu telur,
campuran spesi 1 PC : 3 PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 95,000.00 28,500.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 112,500.00 1,687.50
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 48,487.50
B BAHAN
Semen Portland Kg 11.000 1,020.00 11,220.00
Pasir Pasang m3 0.035 300,000.00 10,500.00
Batu telur kg 15.000 50,000.00 750,000.00
JUMLAH BAHAN 771,720.00
C PERALATAN
JUMLAH PERALATAN -

D JUMLAH (A+B+C) 820,207.50


E Overhead & Profit 15% x D 123,031.13
F Harga Satuan Pekerjaan (D+E) 943,238.63
A. 6.1.1 HARGA SATUAN PEKERJAAN KUSEN, PINTU, JENDELA DAN VENTILASI
A. 6.1.6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 6.000 95,000.00 570,000.00
Tukang kayu L.02 OH 18.000 110,000.00 1,980,000.00
Kepala tukang L.03 OH 1.800 112,500.00 202,500.00
Mandor L.04 OH 0.300 120,000.00 36,000.00
JUMLAH TENAGA KERJA 2,788,500.00
B BAHAN
Balok kayu M3 1.200 2,426,600.00 2,911,920.00
Paku 10 cm Kg 1.250 16,700.00 20,875.00
Lem kayu Kg 1.000 51,785.71 51,785.71
JUMLAH BAHAN 2,984,580.71
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 5,773,080.71


E Overhead & Profit 15% x D 865,962.11
F Harga Satuan Pekerjaan (D+E) 6,639,042.82
Membuat dan memasang 1 m2
A. 6.1.6.5
daun pintu panel, kayu kelas I atau II
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.000 95,000.00 95,000.00
Tukang kayu L.02 OH 3.000 110,000.00 330,000.00
Kepala tukang L.03 OH 0.300 112,500.00 33,750.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 464,750.00
B BAHAN
Papan kayu M3 1.200 4,106,100.00 4,927,320.00
Lem kayu Kg 0.500 10,000.00 5,000.00
JUMLAH BAHAN 4,932,320.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 5,397,070.00


E Overhead & Profit 15% x D 809,560.50
F Harga Satuan Pekerjaan (D+E) 6,206,630.50
A. 7.1.1 HARGA SATUAN PEKERJAAN ATAP
A. 7.1.6.2 Memasang 1 kg rangka kuda-kuda baja IWF
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.060 95,000.00 5,700.00
Tukang Las L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 112,500.00 675.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 13,335.00
B BAHAN
Besi baja IWF Kg 1.150 22,000.00 25,300.00
JUMLAH BAHAN 25,300.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 38,635.00


E Overhead & Profit 15% x D 5,795.25
F Harga Satuan Pekerjaan (D+E) 44,430.25
A. 7.1.6.12 Memasang atap genteng keramik
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.150 95,000.00 14,250.00
Tukang akyu L.02 OH 0.075 110,000.00 8,250.00
Kepala tukang L.03 OH 0.008 112,500.00 900.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 24,360.00
B BAHAN
Genteng keramik Bh 18.000 13,000.00 234,000.00
JUMLAH BAHAN 234,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 258,360.00


E Overhead & Profit 15% x D 38,754.00
F Harga Satuan Pekerjaan (D+E) 297,114.00
A. 8.1.1 HARGA SATUAN PEKERJAAN PLAFOND
A. 8.1.6.4 Memasang 1 m2 langit-langit akustik ukuran (60x120) cm +rangka
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 95,000.00 47,500.00
Tukang Kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 112,500.00 5,625.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 111,125.00
B BAHAN
Profil Alumunium Hollow m 3.600 46,500.00 167,400.00
Kawat diameter 4mm Kg 0.150 25,800.00 3,870.00
Akustik Lbr 1.500 67,000.00 100,500.00
Paku tripleks Kg 0.500 16,700.00 8,350.00
JUMLAH BAHAN 280,120.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 391,245.00


E Overhead & Profit 15% x D 58,686.75
F Harga Satuan Pekerjaan (D+E) 449,931.75
A. 8.1.6.10 Memasang 1 m list plafond akustik
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.500 95,000.00 47,500.00
Tukang Kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 112,500.00 5,625.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 111,725.00
B BAHAN
List plafond Lbr 1.050 28,000.00 29,400.00
Paku Kg 0.010 125,000.00 1,250.00
JUMLAH BAHAN 30,650.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 142,375.00


E Overhead & Profit 15% x D 21,356.25
F Harga Satuan Pekerjaan (D+E) 163,731.25
A. 9.1.1 HARGA SATUAN PEKERJAAN KERAMIK
Memasang 1 m2
A. 9.1.6.4
lantai ubin ukuran (60 x 60) cm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.240 95,000.00 22,800.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 112,500.00 1,350.00
Mandor L.04 OH 0.012 120,000.00 1,440.00
JUMLAH TENAGA KERJA 38,790.00
B BAHAN
Keramik teralux Bh 3.100 126,500.00 392,150.00
Semen portland Kg 9.600 1,020.00 9,792.00
Pasir pasang M3 0.045 300,000.00 13,500.00
Semen warna kg 1.500 4,200.00 6,300.00
JUMLAH BAHAN 421,742.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 460,532.00


E Overhead & Profit 15% x D 69,079.80
F Harga Satuan Pekerjaan (D+E) 529,611.80
Memasang 1 m2
A. 9.1.6.11
lantai ubin ukuran (40 x 40) cm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.250 95,000.00 23,750.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 112,500.00 1,462.50
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 40,522.50
B BAHAN
Keramik teralux Bh 6.630 180,000.00 1,193,400.00
Semen portland Kg 9.800 1,020.00 9,996.00
Pasir pasang M3 0.045 300,000.00 13,500.00
Semen warna kg 1.300 4,200.00 5,460.00
JUMLAH BAHAN 1,222,356.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 1,262,878.50


E Overhead & Profit 15% x D 189,431.78
F Harga Satuan Pekerjaan (D+E) 1,452,310.28
Memasang 1 m
A. 9.1.6.29
plint ubin ukuran (10 x 40) cm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.090 95,000.00 8,550.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 112,500.00 1,012.50
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 20,542.50
B BAHAN
Plint ubin keramik Bh 2.600 4,400.00 11,440.00
Semen portland Kg 1.140 1,020.00 1,162.80
Pasir pasang M3 0.003 300,000.00 900.00
Semen warna kg 0.100 4,200.00 420.00
JUMLAH BAHAN 13,922.80
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 34,465.30


E Overhead & Profit 15% x D 5,169.80
F Harga Satuan Pekerjaan (D+E) 39,635.10
A. 10.1.1 HARGA SATUAN PEKERJAAN ELEKTRIKAL
A. 10.1.6.4 Memasang 1 Bh Saklar Tunggal 1Way 10A/Broco
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Instalator L.01 OH 0.100 100,000.00 10,000.00
Instalator L.02 OH 0.050 110,000.00 5,500.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 21,500.00
B BAHAN
Saklar Tunggal 1Way 10A/Broco Bh 1.000 38,000.00 38,000.00
Klem Pipa Bh 1.000 2,000.00 2,000.00
JUMLAH BAHAN 40,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 61,500.00


E Overhead & Profit 15% x D 9,225.00
F Harga Satuan Pekerjaan (D+E) 70,725.00
A. 10.1.6.5 Memasang 1 Bh Saklar Ganda 1Way 10A/Broco
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Instalator L.01 OH 0.100 100,000.00 10,000.00
Instalator L.02 OH 0.050 110,000.00 5,500.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 21,500.00
B BAHAN
Saklar Ganda 1Way 10A/Broco Bh 1.000 59,000.00 59,000.00
Klem Pipa Bh 1.000 2,000.00 2,000.00
JUMLAH BAHAN 61,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 82,500.00


E Overhead & Profit 15% x D 12,375.00
F Harga Satuan Pekerjaan (D+E) 94,875.00
A. 10.1.6.6 Memasang 1 Bh Stop Kontak Biasa/Broco
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Instalator L.01 OH 0.100 100,000.00 10,000.00
Instalator L.02 OH 0.050 110,000.00 5,500.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 21,500.00
B BAHAN
Stop Kontak Biasa/Broco Bh 1.000 42,000.00 42,000.00
Klem Pipa Bh 1.000 2,000.00 2,000.00
JUMLAH BAHAN 44,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 65,500.00


E Overhead & Profit 15% x D 9,825.00
F Harga Satuan Pekerjaan (D+E) 75,325.00
A. 10.1.6.10 Memasang 1 Titik Pasang armature Lampu LG
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Instalator L.01 OH 0.100 100,000.00 10,000.00
Instalator L.02 OH 0.050 110,000.00 5,500.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 21,500.00
B BAHAN
Lampu LG Type1 1 Bh 1.000 - -
Fitting Plafond Bh 1.000 2,000.00 2,000.00
JUMLAH BAHAN 2,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 23,500.00


E Overhead & Profit 15% x D 3,525.00
F Harga Satuan Pekerjaan (D+E) 27,025.00
DAFTAR HARGA SATUAN PEKERJAAN

HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
PEKERJAAN (Rp)

HARGA SATUAN PEKERJAAN PERSIAPAN


1 Mobilisasi dan Demobilisasi (Tenaga Kerja dan Peralatan) Ls Lumpsum
2 Pembuatan 1 Buah Papan Nama Pekerjaan Menggunakan Multiflex 18mm Bh 873,681.27 Anl. PUPR, 2016
3 Pemasokan Listrik dan Air Kerja Ls Lumpsum
4 Shop Drawing dan As-built Drawing Ls Lumpsum
5 Site Management (Pelaporan/Dokumentasi proyek) Ls Lumpsum
6 Penyelengaraan SMKK Ls Lumpsum
7 (K3) Pembuatan 1 m' pagar sementara dari seng gelombang tinggi 2 m' m 435,075.96 Anl. PUPR, 2016
8 Pengukuran dan pemasangan 1 m’ Bouwplank m' 79,139.72 Anl. PUPR, 2016
9 (K3) Pembuatan 1 m2 kantor sementara lantai plesteran m2 1,416,672.40 Anl. PUPR, 2016
10 (K3) Pembuatan 1 m2 gudang semen dan peralatan m2 1,145,183.60 Anl. PUPR, 2016
11 (K3) Pembersihan 1 m2 lapangan dan perataan m2 275,000.00 Anl. PUPR, 2016

HARGA SATUAN PEKERJAAN TANAH


12 Penggalian 1 m3 tanah biasa sedalam 2 m m³ 99,990.00 Anl. PUPR, 2016
13 Pengurugan 1m³ Tanah Dipadatkan m³ 110,825.00 Anl. PUPR, 2016
14 (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) m³ 58,850.00 Anl. PUPR, 2016
15 Pengurugan 1m3 Tanah Dipadatkan m³ 110,825.00 Anl. PUPR, 2016
16 Pengurugan 1 m3 dengan pasir urug m³ 160,182.00 Anl. PUPR, 2016

HARGA SATUAN PEKERJAAN PONDASI BATU KALI


17 Pemasangan 1 m3 pondasi batu kali campuran 1SP : 4PP m³ 923,073.25 Anl. PUPR, 2016
18 (K3) Pemasangan 1 m3 batu kosong (anstamping) m³ 515,416.33 Anl. PUPR, 2016

HARGA SATUAN PEKERJAAN BETON


19 Membuat 1m3 beton mutu f'c = 31,2 Mpa (K 350), slump (12 2) cm, w/c = 0.48 m³ 1,190,329.25 Anl. PUPR, 2016
20 Membuat 1m³ beton mutu f'c = 7,4 Mpa (K 100), slump (3 6) cm, w/c = 0.87 m³ 960,267.00 Anl. PUPR, 2016
21 Pembesian 1 kg dengan besi polos atau besi ulir Kg 20,769.65 Anl. PUPR, 2016
22 Pemasangan 1 m2 bekisting untuk pondasi m2 228,922.10 Anl. PUPR, 2016
23 Pemasangan 1 m2 bekisting untuk sloof m2 219,595.20 Anl. PUPR, 2016
24 Pemasangan 1 m2 bekisting untuk kolom m2 339,039.80 Anl. PUPR, 2016
25 Pemasangan 1 m2 bekisting untuk balok m2 345,514.73 Anl. PUPR, 2016
26 Pemasangan 1 m2 bekisting untuk plat lantai m2 435,839.80 Anl. PUPR, 2016
27 Pemasangan 1 m2 bekisting untuk dinding m2 362,403.80 Anl. PUPR, 2016
28 Pemasangan 1 m2 bekisting untuk tangga m2 341,607.20 Anl. PUPR, 2016

HARGA SATUAN PEKERJAAN DINDING


29 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP m2 149,937.70 Anl. PUPR, 2016
30 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm1/2 bata, campuran 1 PC : 5 PP m2 141,678.46 Anl. PUPR, 2016
31 Membuat 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm ditambah dengan MILL m2 35,010.45 Anl. PUPR, 2016
32 Membuat 1 m2 acian m2 39,204.00 Anl. PUPR, 2016
33 Membuat 1 m' Sponengan Dinding m' 18,451.95 Anl. PUPR, 2016
34 Membuat
Memasang1 1m2m2acian Waterproofing m2 88,357.50 Anl. PUPR, 2016
35 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran m2 516,059.50 Anl. PUPR, 2016
36 spesi 1 PC :14m2
Memasang PPtambahan Batu Alam untuk bata expose m2 336,232.71 Anl. PUPR, 2016
37 dinding batu telur, m2 158,118.73 Anl. PUPR, 2016
campuran spesi 1 PC : 3 PP
HARGA SATUAN PEKERJAAN KUSEN, PINTU, JENDELA DAN VENTILASI
30 Membuat dan Memasang 1 Buah Pintu Tipe P1 bh Err:509 Anl. PUPR, 2016
31 Membuat dan Memasang 1 Buah Pintu Tipe P2 bh Err:509 Anl. PUPR, 2016
32 Membuat dan Memasang 1 Buah Pintu Tipe P3 bh Err:509 Anl. PUPR, 2016
33 Membuat dan Memasang 1 Buah Pintu Tipe P4 bh Err:509 Anl. PUPR, 2016
34 Membuat dan Memasang 1 Buah Pintu Tipe P5 bh Err:509 Anl. PUPR, 2016
34 Membuat dan Memasang 1 Buah Jendela Tipe J1 bh Err:509 Anl. PUPR, 2016
35 Membuat dan Memasang 1 Buah Jendela Tipe J2 bh Err:509 Anl. PUPR, 2016
36 Membuat dan Memasang 1 Buah Pintu Type PL1 bh Err:509 Anl. PUPR, 2016
37 Membuat dan Memasang 1 Buah Pintu Type PL2
Type A - 9 Kisi bh Err:509 Anl. PUPR, 2016
Type B - 6 Kisi bh Err:509 Anl. PUPR, 2017
Type C - 5 Kisi bh Err:509 Anl. PUPR, 2018
Type d - 4 Kisi bh Err:509 Anl. PUPR, 2019
38 Membuat dan Memasang 1 Buah Ventilasi BV 1 bh Err:509 Anl. PUPR, 2016
39 Membuat dan Memasang 1 Buah Ventilasi BV 2 bh Err:509 Anl. PUPR, 2016
40 Membuat dan Memasang 1 Buah Ventilasi BV 3 bh Err:509 Anl. PUPR, 2017
40 Err:509 bh Err:509 Anl. PUPR, 2017
HARGA SATUAN PEKERJAAN ATAP
42 Memasang 1 kg rangka kuda-kuda baja IWF kg 43,051.25 Anl. PUPR, 2016
43 Memasang atap genteng keramik m2 404,503.00 Anl. PUPR, 2016
44 Memasang Lisplank m' 286,357.50 Anl. PUPR, 2016
45 Memasang 1 kg Gording Profil C m 43,051.25 Anl. PUPR, 2016
46 Memasang 1m' Pipa Baja untuk struktur Kanopy m' 560,725.00 Anl. PUPR, 2016
47 Memasang 1m2 Kaca tempered m2 728,200.00 Anl. PUPR, 2016

HARGA SATUAN PEKERJAAN PLAFOND


48 Memasang 1 m2 Plafond Gypsum Jayaboard m2 189,406.25 Anl. PUPR, 2016
49 Memasang 1 m2 Plafond GRC Super Panel m2 153,903.75 Anl. PUPR, 2016
50 Memasang 1 m2 HPL m2 308,704.00 Anl. PUPR, 2016
51 Memasang 1m2 Plafond Kayu Balok (lambersering) m2 265,167.65 Anl. PUPR, 2016
52 Memasang 1 m2 Plafond Akustik m2 327,497.50 Anl. PUPR, 2016
53 Memasang 1 m list plafond Gypsum m' 50,772.15 Anl. PUPR, 2016

HARGA SATUAN PEKERJAAN KERAMIK


52 Pemasangan 1 m2 lantai ubin m2 124,451.25 Anl. PUPR, 2015
53 Material 1 m2 lantai ubin ukuran (60 x 60) cm m2 332,356.20 Anl. PUPR, 2016
54 Material 1 m2 lantai ubin ukuran (40 x 40) cm m2 257,802.60 Anl. PUPR, 2016
55 Material 1 m2 lantai ubin ukuran (30 X 60) cm m2 257,802.60 Anl. PUPR, 2016
56 Pemasangan 1 m2 lantai Marmer m3 457,875.00 Anl. PUPR, 2016
57 Material 1 m2 lantai Marmer m4 1,822,002.60 Anl. PUPR, 2016
58 Pemasangan 1m Plint Lantai m 58,795.00 Anl. PUPR, 2016
59 Material 1m Plint Lantai m 15,942.08 Anl. PUPR, 2016
60 Pemasangan 1m' Step Nosing m 35,337.50 Anl. PUPR, 2016
61 Material 1m' Step Nosing m 83,737.39 Anl. PUPR, 2016
62 Pemasangan 1m' Lis Keramik m 8,092.56 Anl. PUPR, 2016
63 Material Pemasangan Lis Keramik m 10,343.85 Anl. PUPR, 2016
64 Memasang 1 m' Railing Tangga m 1,072,582.50 Anl. PUPR, 2016

HARGA SATUAN PEKERJAAN FINISHING


60 Pekerjaan 1m2 Pengecatan Dinding Baru Interior m2 41,281.63 Anl. PUPR, 2016
61 Pekerjaan 1m2 Pengecatan Dinding Baru Exterior m2 49,201.63 Anl. PUPR, 2016
62 Pekerjaan 1m2 Pengecatan Dinding Roster m2 50,488.63 Anl. PUPR, 2016
59 Pekerjaan 1m2 Pengecatan Kayu bidang Baru m2 52,342.40 Anl. PUPR, 2016
63 Pekerjaan 1m2 Pengecatan Plafond m2 40,724.75 Anl. PUPR, 2016
64 Pekerjaan 1m2 Pengecatan Besi Profil dengan Menie Zinchromate m2 34,342.00 Anl. PUPR, 2016

HARGA SATUAN PEKERJAAN AIR HUJAN


Pekerjaan 1m3 Ijuk Untuk resapan m3 297,550.00 Anl. PUPR, 2016
Pekerjaan 1m3 Kerikil Untuk Resapan m3 765,050.00 Anl. PUPR, 2016
Pekerjaan 1m' PIPA PVC 6" m' 436,507.50 Anl. PUPR, 2016
Pekerjaan 1m' Talang 20cm m' 388,987.50 Anl. PUPR, 2016
Pekerjaan 1m' Buis Beton 40cm (U) m' 144,540.00 Anl. PUPR, 2016
Pekerjaan 1m' Buis Beton 80cm (O) m' 386,540.00 Anl. PUPR, 2016
Pekerjaan 1m' Grill Gutter m' 979,770.00 Anl. PUPR, 2016
Pekerjaan 1m' Penutup Sumur Resapan buah 447,040.00 Anl. PUPR, 2016
HARGA SATUAN PEKERJAAN ELEKTRIKAL
64 Memasang 1 Bh Saklar Tunggal Scneider buah 172,700.00 Anl. PUPR, 2016
65 Memasang 1 Bh Saklar Ganda Scneider buah 195,800.00 Anl. PUPR, 2016
66 Memasang 1 Bh Stop Kontak Biasa Scneider buah 177,100.00 Anl. PUPR, 2016
67 Memasang 1 Titik Pasang armature Lampu LG buah 2,116,180.00 Anl. PUPR, 2016
68 Memasang 1 Titik Pasang Panel Listrik buah 40,916,260.00 Anl. PUPR, 2016
69 Memasang 1 Titik Pasang Lampu Downlight buah 280,390.00 Anl. PUPR, 2016
70 Memasang 1 Titik Pasang Lampu Otomatis buah 291,940.00 Anl. PUPR, 2016
72 Memasang 1m' LED Strips m' 183,590.00 Anl. PUPR, 2016
73 Memasang 1m Instalasi Kabel Listrik titik 26,548.50 Anl. PUPR, 2016
HARGA SATUAN PEKERJAAN TAMAN
72 Pekerjaan 1m2 Taman m2 143,330.00 Anl. PUPR, 2016
ANALISA HARGA SATUAN PEKERJAAN
" LAMPIRAN PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NO. 28 TAHUN 2016 - BIDANG CIPTA KARYA "

A. 2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.2. (K3) Pembuatan 1 m' pagar sementara dari seng gelombang tinggi 2 m'
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.200 95,000.00 19,000.00
Tukang kayu OH 0.400 110,000.00 44,000.00
Kepala tukang OH 0.020 112,500.00 2,250.00
Mandor OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 67,650.00
B BAHAN
Dolken kayu galam dia 8-10 cm, pjg 4 m (Perancah) btg 1.250 22,000.00 27,500.00
Semen / PC (kg) Kg 2.500 1,020.00 2,550.00
Seng plat BJLS-30 lebar 0,6 M' lmbr 1.200 70,000.00 84,000.00
Pasir Beton (Kasar) kg 7.000 250.00 1,750.00
Batu Belah m³ 0.009 162,400.00 1,461.60
Kayu Perancah 5/7 Cm m³ 0.072 2,700,000.00 194,400.00
Paku biasa 5 cm - 7 cm kg 0.060 16,700.00 1,002.00
Meni besi - warna Kg 0.450 33,800.00 15,210.00
JUMLAH BAHAN 327,873.60
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 395,523.60


E Overhead & Profit 10% x D 39,552.36
F Harga Satuan Pekerjaan (D+E) 435,075.96

A. 03. a1 Pembuatan 1 Buah Papan Nama Pekerjaan Menggunakan Multiflex 18mm


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.500 95,000.00 47,500.00
Tukang kayu OH 0.500 110,000.00 55,000.00
Kepala Tukang OH 0.100 112,500.00 11,250.00
Tukang Cat OH 0.500 110,000.00 55,000.00
Mandor OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 169,950.00
B BAHAN
Multiplek tebal 18 mm Lbr 0.350 252,600.00 88,410.00
Kayu Marsawa ( Balok ) Klas II m³ 0.077 3,029,100.00 233,240.70
Besi Siku L 30.30.3 kg 5.800 14,100.00 81,780.00
Paku biasa 5 cm - 7 cm kg 1.250 16,700.00 20,875.00
Cat Kayu Merk Mowilex 1 Kg Kg 2.500 80,000.00 200,000.00
JUMLAH BAHAN 624,305.70
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 794,255.70


E Overhead & Profit 10% x D 79,425.57
F Harga Satuan Pekerjaan (D+E) 873,681.27
A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.100 95,000.00 9,500.00
Tukang kayu OH 0.100 110,000.00 11,000.00
Kepala tukang OH 0.010 112,500.00 1,125.00
Mandor OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 22,225.00
B BAHAN
Kayu Perancah 5/7 Cm m³ 0.012 2,700,000.00 32,400.00
Paku biasa 5 cm - 7 cm kg 0.020 16,700.00 334.00
Kayu Merantih ( Balok ) Klas III m³ 0.007 2,426,600.00 16,986.20
JUMLAH BAHAN 49,720.20
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 71,945.20


E Overhead & Profit 10% x D 7,194.52
F Harga Satuan Pekerjaan (D+E) 79,139.72

A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 2.000 95,000.00 190,000.00
Tukang kayu OH 2.000 110,000.00 220,000.00
Tukang batu OH 1.000 110,000.00 110,000.00
Kepala tukang OH 0.300 112,500.00 33,750.00
Mandor OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 559,750.00
B BAHAN
Dolken kayu galam dia 8-10 cm, pjg 4 m (Perancah) btg 1.250 22,000.00 27,500.00
Kayu Merantih ( Balok ) Klas III m³ 0.180 2,426,600.00 436,788.00
Paku biasa 5 cm - 7 cm kg 0.080 16,700.00 1,336.00
Besi strip kg 1.100 12,100.00 13,310.00
Semen / PC (kg) Kg 35.000 1,020.00 35,700.00
Pasir Pasang (Sedang) m³ 0.150 300,000.00 45,000.00
Pasir Beton (Kasar) kg 140.000 250.00 35,000.00
Batu Belah m³ 0.150 162,400.00 24,360.00
Batu bata / merah bakar kelas I Bh 30.000 900.00 27,000.00
Seng plat BJLS-30 lebar 0,6 M' lmbr 0.250 70,000.00 17,500.00
Jendela naco ( 15 x 90 ) cm + Rangka Bh 0.200 189,100.00 37,820.00
Kaca Polos Tebal 5 mm M2 0.080 104,400.00 8,352.00
Kunci tanam Set 0.150 90,000.00 13,500.00
Plywood 4 mm Lbr 0.060 82,800.00 4,968.00
JUMLAH BAHAN 728,134.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 1,287,884.00


E Overhead & Profit 10% x D 128,788.40
F Harga Satuan Pekerjaan (D+E) 1,416,672.40
A. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 1.000 95,000.00 95,000.00
Tukang kayu OH 2.000 110,000.00 220,000.00
Kepala tukang OH 0.200 112,500.00 22,500.00
Mandor OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 343,500.00
B BAHAN
Dolken kayu galam dia 8-10 cm, pjg 4 m (Perancah) btg 1.700 22,000.00 37,400.00
Kayu Merantih ( Balok ) Klas III m³ 0.210 2,426,600.00 509,586.00
Paku biasa 5 cm - 7 cm kg 0.300 16,700.00 5,010.00
Semen / PC (kg) Kg 10.500 1,020.00 10,710.00
Pasir Beton (Kasar) kg 42.000 250.00 10,500.00
Batu Belah m³ 0.050 162,400.00 8,120.00
Seng plat BJLS-30 lebar 0,6 M' lmbr 1.500 70,000.00 105,000.00
Seng plat lebar 0,9 M' t=0,02 lmbr 0.250 45,000.00 11,250.00
JUMLAH BAHAN 697,576.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 1,041,076.00


E Overhead & Profit 10% x D 104,107.60
F Harga Satuan Pekerjaan (D+E) 1,145,183.60
A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 2.000 95,000.00 190,000.00
Mandor OH 0.500 120,000.00 60,000.00
JUMLAH TENAGA KERJA 250,000.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 250,000.00


E Overhead & Profit 10% x D 25,000.00
F Harga Satuan Pekerjaan (D+E) 275,000.00
A. 2.3.1. HARGA SATUAN PEKERJAAN TANAH
A. 2.3.1.1. Penggalian 1 m³ tanah biasa sedalam 2 m
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.900 95,000.00 85,500.00
Mandor OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 90,900.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 90,900.00


E Overhead & Profit 10% x D 9,090.00
F Harga Satuan Pekerjaan (D+E) 99,990.00

A. 2.3.1.9. Pengurugan kembali 1 m³ galian tanah


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.300 95,000.00 28,500.00
Mandor OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 32,100.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 32,100.00


E Overhead & Profit 10% x D 3,210.00
F Harga Satuan Pekerjaan (D+E) 35,310.00

A. 2.3.1.10. (K3) Pemadatan tanah 1 m³ tanah ( per 20 cm)


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.500 95,000.00 47,500.00
Mandor OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 53,500.00


E Overhead & Profit 10% x D 5,350.00
F Harga Satuan Pekerjaan (D+E) 58,850.00
A. 2.3.1.10.a Pengurugan 1m³ Tanah Dipadatkan
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.500 95,000.00 47,500.00
Mandor OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Bahan Tanah Timbunan m³ 1.050 45,000.00 47,250.00
JUMLAH BAHAN 47,250.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 100,750.00


E Overhead & Profit 10% x D 10,075.00
F Harga Satuan Pekerjaan (D+E) 110,825.00
A. 2.3.1.11. Pengurugan 1 m³ dengan pasir urug
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.300 95,000.00 28,500.00
Mandor OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 29,700.00
B BAHAN
Pasir Urug m³ 1.050 110,400.00 115,920.00
JUMLAH BAHAN 115,920.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 145,620.00


E Overhead & Profit 10% x D 14,562.00
F Harga Satuan Pekerjaan (D+E) 160,182.00

A. 3.2.1 HARGA SATUAN PEKERJAAN PONDASI BATU KALI


A. 3.2.1.3. Pemasangan 1 m³ pondasi batu kali campuran 1SP : 5PP
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 1.500 95,000.00 142,500.00
Tukang batu OH 0.750 110,000.00 82,500.00
Kepala tukang OH 0.075 112,500.00 8,437.50
Mandor OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 242,437.50
B BAHAN
Batu Kali m³ 1.100 268,000.00 294,800.00
Semen / PC (kg) Kg 136.000 1,020.00 138,720.00
Pasir Pasang (Sedang) m³ 0.544 300,000.00 163,200.00
JUMLAH BAHAN 596,720.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 839,157.50


E Overhead & Profit 10% x D 83,915.75
F Harga Satuan Pekerjaan (D+E) 923,073.25
A. 3.2.1.9. (K3) Pemasangan 1 m³ batu kosong (anstamping)
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.780 95,000.00 74,100.00
Tukang batu OH 0.390 110,000.00 42,900.00
Kepala tukang OH 0.039 112,500.00 4,387.50
Mandor OH 0.039 120,000.00 4,680.00
JUMLAH TENAGA KERJA 126,067.50
B BAHAN
Batu Kali m³ 1.100 268,000.00 294,800.00
Pasir urug m³ 0.432 110,400.00 47,692.80
JUMLAH BAHAN 342,492.80
C PERALATAN
JUMLAH PERALATAN -

D JUMLAH (A+B+C) 468,560.30


E Overhead & Profit 10% x D 46,856.03
F Harga Satuan Pekerjaan (D+E) 515,416.33

A. 4.1.1 HARGA SATUAN PEKERJAAN BETON


A. 4.1.6.12 Membuat 1m³ beton mutu f'c = 31,2 Mpa (K 350), slump (12 2) cm, w/c = 0.48
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 2.100 95,000.00 199,500.00
Tukang batu OH 0.350 110,000.00 38,500.00
Kepala tukang OH 0.035 112,500.00 3,937.50
Mandor OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 254,537.50
B BAHAN
Semen / PC (kg) Kg 448.00 1,020.00 456,960.00
Pasir Beton (Kasar) kg 667.00 250.00 166,750.00
Kerikil/agregat Beton Kg 1,000.00 200.00 200,000.00
Air Ltr 215.00 18.00 3,870.00
JUMLAH BAHAN 827,580.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 1,082,117.50


E Overhead & Profit 10% x D 108,211.75
F Harga Satuan Pekerjaan (D+E) 1,190,329.25
A. 4.1.6.12 Membuat 1m³ beton mutu f'c = 7,4 Mpa (K 100), slump (3 6) cm, w/c = 0.87
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 1.650 95,000.00 156,750.00
Tukang batu OH 0.275 110,000.00 30,250.00
Kepala tukang OH 0.028 112,500.00 3,150.00
Mandor OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 200,110.00
B BAHAN
Semen / PC (kg) Kg 247.00 1,020.00 251,940.00
Pasir Beton (Kasar) kg 869.00 250.00 217,250.00
Kerikil/agregat Beton Kg 999.00 200.00 199,800.00
Air Ltr 215.00 18.00 3,870.00
JUMLAH BAHAN 672,860.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 872,970.00


E Overhead & Profit 10% x D 87,297.00
F Harga Satuan Pekerjaan (D+E) 960,267.00

A. 4.1.6.13 Pembesian 1 kg dengan besi polos atau besi ulir


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.4 95,000.00 38,000.00
Tukang besi OH 0.4 110,000.00 44,000.00
Kepala tukang OH 0.04 112,500.00 4,500.00
Mandor OH 0.1 120,000.00 12,000.00
JUMLAH TENAGA KERJA 98,500.00
B BAHAN
Baja Tulangan(Ulir) D39 Kg 105.000 16,800.00 1,764,000.00
Kawat Beton / Bendrat Kg 1.500 17,100.00 25,650.00
JUMLAH BAHAN 1,789,650.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 1,888,150.00


E Overhead & Profit 10% x D 188,815.00
F Harga Satuan Pekerjaan (D+E) 20,769.65
A. 4.1.6.14 Pemasangan 1 m2 bekisting untuk pondasi
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.520 95,000.00 49,400.00
Tukang kayu OH 0.260 110,000.00 28,600.00
Kepala tukang OH 0.026 112,500.00 2,925.00
Mandor OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 84,045.00
B BAHAN
Kayu Bekisting ( Papan ) Klas IV m³ 0.020 1,890,600.00 37,812.00
Kayu Bekisting ( Balok ) Klas IV m³ 0.040 1,962,100.00 78,484.00
Paku biasa 5 cm - 7 cm kg 0.300 16,700.00 5,010.00
Minyak bekisting Ltr 0.200 13,800.00 2,760.00
JUMLAH BAHAN 124,066.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 208,111.00


E Overhead & Profit 10% x D 20,811.10
F Harga Satuan Pekerjaan (D+E) 228,922.10

A. 4.1.6.15 Pemasangan 1 m2 bekisting untuk sloof


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.520 95,000.00 49,400.00
Tukang kayu OH 0.260 110,000.00 28,600.00
Kepala tukang OH 0.026 112,500.00 2,925.00
Mandor OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 84,045.00
B BAHAN
Kayu Merantih ( Balok ) Klas III m³ 0.045 2,426,600.00 109,197.00
Paku biasa 5 cm - 7 cm kg 0.300 16,700.00 5,010.00
Minyak bekisting Ltr 0.100 13,800.00 1,380.00
JUMLAH BAHAN 115,587.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 199,632.00


E Overhead & Profit 10% x D 19,963.20
F Harga Satuan Pekerjaan (D+E) 219,595.20
A. 4.1.6.16 Pemasangan 1 m2 bekisting untuk kolom
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.660 95,000.00 62,700.00
Tukang kayu OH 0.330 110,000.00 36,300.00
Kepala tukang OH 0.033 112,500.00 3,712.50
Mandor OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 106,672.50
B BAHAN
Kayu Bekisting ( Papan ) Klas IV m³ 0.040 1,890,600.00 75,624.00
Kayu Bekisting ( Balok ) Klas IV m³ 0.015 1,962,100.00 29,431.50
Paku biasa 5 cm - 7 cm kg 0.400 16,700.00 6,680.00
Minyak bekisting Ltr 0.200 13,800.00 2,760.00
Plywood 9 mm Lbr 0.350 123,000.00 43,050.00
Dolken kayu galam dia 8-10 cm, pjg 4 m (Perancah) btg 2.000 22,000.00 44,000.00
JUMLAH BAHAN 201,545.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 308,218.00


E Overhead & Profit 10% x D 30,821.80
F Harga Satuan Pekerjaan (D+E) 339,039.80

A. 4.1.6.17 Pemasangan 1 m2 bekisting untuk balok


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.660 95,000.00 62,700.00
Tukang kayu OH 0.330 110,000.00 36,300.00
Kepala tukang OH 0.033 112,500.00 3,712.50
Mandor OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 106,672.50
B BAHAN
Kayu Bekisting ( Papan ) Klas IV m³ 0.040 1,890,600.00 75,624.00
Kayu Bekisting ( Balok ) Klas IV m³ 0.018 1,962,100.00 35,317.80
Paku biasa 5 cm - 7 cm kg 0.400 16,700.00 6,680.00
Minyak bekisting Ltr 0.200 13,800.00 2,760.00
Plywood 9 mm Lbr 0.350 123,000.00 43,050.00
Dolken kayu galam dia 8-10 cm, pjg 4 m (Perancah) btg 2.000 22,000.00 44,000.00
JUMLAH BAHAN 207,431.80
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 314,104.30


E Overhead & Profit 10% x D 31,410.43
F Harga Satuan Pekerjaan (D+E) 345,514.73
A. 4.1.6.18 Pemasangan 1 m2 bekisting untuk plat lantai
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.660 95,000.00 62,700.00
Tukang kayu OH 0.330 110,000.00 36,300.00
Kepala tukang OH 0.033 112,500.00 3,712.50
Mandor OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 106,672.50
B BAHAN
Kayu Bekisting ( Papan ) Klas IV m³ 0.040 1,890,600.00 75,624.00
Kayu Bekisting ( Balok ) Klas IV m³ 0.015 1,962,100.00 29,431.50
Paku biasa 5 cm - 7 cm kg 0.400 16,700.00 6,680.00
Minyak bekisting Ltr 0.200 13,800.00 2,760.00
Plywood 9 mm Lbr 0.350 123,000.00 43,050.00
Dolken kayu galam dia 8-10 cm, pjg 4 m (Perancah) btg 6.000 22,000.00 132,000.00
JUMLAH BAHAN 289,545.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 396,218.00


E Overhead & Profit 10% x D 39,621.80
F Harga Satuan Pekerjaan (D+E) 435,839.80

A. 4.1.6.19 Pemasangan 1 m2 bekisting untuk dinding


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.660 95,000.00 62,700.00
Tukang kayu OH 0.330 110,000.00 36,300.00
Kepala tukang OH 0.033 112,500.00 3,712.50
Mandor OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 106,672.50
B BAHAN
Kayu Bekisting ( Papan ) Klas IV m³ 0.040 1,890,600.00 75,624.00
Kayu Bekisting ( Balok ) Klas IV m³ 0.015 1,962,100.00 29,431.50
Plywood 9 mm Lbr 0.350 123,000.00 43,050.00
Dolken kayu galam dia 10 cm, pjg 4 m (Perancah) btg 2.000 34,000.00 68,000.00
Paku biasa 5 cm - 7 cm kg 0.400 16,700.00 6,680.00
Penjaga jarak bekising/spacer btg 4.000 19,500.00 78,000.00
Minyak bekisting Ltr 0.200 13,800.00 2,760.00
JUMLAH BAHAN 222,785.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 329,458.00


E Overhead & Profit 10% x D 32,945.80
F Harga Satuan Pekerjaan (D+E) 362,403.80
A. 4.1.6.20 Pemasangan 1 m2 bekisting untuk tangga
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.660 95,000.00 62,700.00
Tukang kayu OH 0.330 110,000.00 36,300.00
Kepala tukang OH 0.033 112,500.00 3,712.50
Mandor OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 106,672.50
B BAHAN
Kayu Bekisting ( Papan ) Klas IV m³ 0.030 1,890,600.00 56,718.00
Kayu Bekisting ( Balok ) Klas IV m³ 0.015 1,962,100.00 29,431.50
Plywood 9 mm Lbr 0.350 123,000.00 43,050.00
Dolken kayu galam dia 10 cm, pjg 4 m (Perancah) btg 2.000 34,000.00 68,000.00
Paku biasa 5 cm - 7 cm kg 0.400 16,700.00 6,680.00
Minyak bekisting Ltr 0.150 13,800.00 2,070.00
JUMLAH BAHAN 203,879.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 310,552.00


E Overhead & Profit 10% x D 31,055.20
F Harga Satuan Pekerjaan (D+E) 341,607.20

A. 5.1.1 HARGA SATUAN PEKERJAAN DINDING


A. 5.1.6.3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.300 95,000.00 28,500.00
Tukang batu OH 0.100 110,000.00 11,000.00
Kepala Tukang OH 0.010 112,500.00 1,125.00
Mandor OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 42,425.00
B BAHAN
Semen / PC (kg) Kg 19.100 1,020.00 19,482.00
Pasir Pasang (Sedang) m³ 0.038 300,000.00 11,400.00
Batu bata / merah bakar kelas I Bh 70.000 900.00 63,000.00
JUMLAH BAHAN 93,882.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 136,307.00


E Overhead & Profit 10% x D 13,630.70
F Harga Satuan Pekerjaan (D+E) 149,937.70
A. 5.1.6.3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm1/2 bata, campuran 1 PC : 5 PP
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.300 95,000.00 28,500.00
Tukang batu OH 0.100 110,000.00 11,000.00
Kepala Tukang OH 0.010 112,500.00 1,125.00
Mandor OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 42,425.00
B BAHAN
Semen / PC (kg) Kg 9.680 1,020.00 9,873.60
Pasir Pasang (Sedang) m³ 0.045 300,000.00 13,500.00
Batu bata / merah bakar kelas I Bh 70.000 900.00 63,000.00
JUMLAH BAHAN 86,373.60
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 128,798.60


E Overhead & Profit 10% x D 12,879.86
F Harga Satuan Pekerjaan (D+E) 141,678.46

A. 5.1.6.4 Membuat 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm ditambah dengan MILL


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.150 95,000.00 14,250.00
Tukang batu OH 0.075 110,000.00 8,250.00
Kepala tukang OH 0.008 112,500.00 900.00
Mandor OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 24,360.00
B BAHAN
Semen / PC (kg) Kg 5.184 1,020.00 5,287.68
Mill Plesteran kg 1.000 1,400.00 1,400.00
Pasir Pasang (Sedang) m³ 0.003 300,000.00 780.00
JUMLAH BAHAN 7,467.68
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 31,827.68


E Overhead & Profit 10% x D 3,182.77
F Harga Satuan Pekerjaan (D+E) 35,010.45
A. 5.1.6.5 Membuat 1 m2 acian
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.200 95,000.00 19,000.00
Tukang batu OH 0.100 110,000.00 11,000.00
Kepala tukang OH 0.010 112,500.00 1,125.00
Mandor OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 32,325.00
B BAHAN
Semen / PC (kg) Kg 3.250 1,020.00 3,315.00
JUMLAH BAHAN 3,315.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 35,640.00


E Overhead & Profit 10% x D 3,564.00
F Harga Satuan Pekerjaan (D+E) 39,204.00

A. 5.1.6.5 Membuat 1 m' Sponengan Dinding


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.100 95,000.00 9,500.00
Tukang batu OH 0.050 110,000.00 5,500.00
Kepala tukang OH 0.005 112,500.00 562.50
Mandor OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 16,162.50
B BAHAN
Semen / PC (kg) Kg 0.600 1,020.00 612.00
JUMLAH BAHAN 612.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 16,774.50


E Overhead & Profit 10% x D 1,677.45
F Harga Satuan Pekerjaan (D+E) 18,451.95

A.4.4.2.26. Pemasangan 1 m2 finishing siar pas. Batu kali 1 sp : 1 pp


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.300 95,000.00 28,500.00
Tukang batu OH 0.150 110,000.00 16,500.00
Kepala tukang OH 0.015 112,500.00 1,687.50
Mandor OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 48,487.50
B BAHAN
Pasir Pasang (Sedang) m³ 0.0120 300,000.00
Semen / PC (kg) Kg 6.340 1,020.00 6,466.80
JUMLAH BAHAN 6,466.80
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 54,954.30


E Overhead & Profit 10% x D 5,495.43
F Harga Satuan Pekerjaan (D+E) 60,449.73

A.5.1.1.29. Pemasangan 1 m1 pipa PVC tipe AW diameter 2"


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.054 95,000.00 5,130.00
Tukang batu OH 0.090 110,000.00 9,900.00
Kepala tukang OH 0.009 112,500.00 1,012.50
Mandor OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 16,402.50
B BAHAN
Pipa PVC AW - Diameter 2 " M' 1.2000 19,800.00 23,760.00
-
JUMLAH BAHAN 23,760.00
C PERALATAN % 0.3500 40,162.50 14,056.88

JUMLAH PERALATAN 14,056.88

D JUMLAH (A+B+C) 54,219.38


E Overhead & Profit 10% x D 5,421.94
F Harga Satuan Pekerjaan (D+E) 59,641.31

A. 5.1.6.5 Membuat 1 m2 acian Waterproofing


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.200 95,000.00 19,000.00
Tukang batu OH 0.100 110,000.00 11,000.00
Kepala tukang OH 0.010 112,500.00 1,125.00
Mandor OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 32,325.00
B BAHAN
Sika Top 107 Plus Pelapis 4.5 Set A+B klng 0.400 120,000.00 48,000.00
JUMLAH BAHAN 48,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 80,325.00


E Overhead & Profit 10% x D 8,032.50
F Harga Satuan Pekerjaan (D+E) 88,357.50
Memasang 1 m2
A. 5.1.6.23 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran
spesi 1 PC : 4 PP
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.300 95,000.00 28,500.00
Tukang batu OH 0.100 110,000.00 11,000.00
Kepala tukang OH 0.010 112,500.00 1,125.00
Mandor OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 42,425.00
B BAHAN
Semen / PC (kg) Kg 11.000 1,020.00 11,220.00
Pasir Pasang (Sedang) m³ 0.035 300,000.00 10,500.00
Roster Bh 30.000 13,500.00 405,000.00
JUMLAH BAHAN 426,720.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 469,145.00


E Overhead & Profit 10% x D 46,914.50
F Harga Satuan Pekerjaan (D+E) 516,059.50

A. 5.1.6.24 Memasang 1 m2 tambahan Batu Alam untuk bata expose


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.300 95,000.00 28,500.00
Tukang batu OH 0.150 110,000.00 16,500.00
Kepala tukang OH 0.015 112,500.00 1,687.50
Mandor OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 48,487.50
B BAHAN
Semen / PC (kg) Kg 14.000 1,020.00 14,280.00
Pasir Pasang (Sedang) m³ 0.032 300,000.00 9,600.00
Batu Alam 10x20 m2 1.100 95,000.00 104,500.00
JUMLAH BAHAN 128,380.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 176,867.50


E Overhead & Profit 10% x D 17,686.75
F Harga Satuan Pekerjaan (D+E) 194,554.25
Memasang 1 m2
A. 5.1.6.25 dinding batu telur,
campuran spesi 1 PC : 3 PP
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.400 95,000.00 38,000.00
Tukang batu OH 0.150 110,000.00 16,500.00
Kepala tukang OH 0.015 112,500.00 1,687.50
Mandor OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 57,987.50
B BAHAN
Semen / PC (kg) Kg 5.840 1,020.00 5,956.80
Pasir Pasang (Sedang) m³ 0.016 300,000.00 4,800.00
Batu Telur Zak 1.500 50,000.00 75,000.00
JUMLAH BAHAN 85,756.80
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 143,744.30


E Overhead & Profit 10% x D 14,374.43
F Harga Satuan Pekerjaan (D+E) 158,118.73

A. 7.1.1 HARGA SATUAN PEKERJAAN ATAP


A. 7.1.6.2 Memasang 1 kg rangka kuda-kuda baja IWF
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.022 95,000.00 2,090.00
Tukang Las OH 0.022 110,000.00 2,420.00
Kepala tukang OH 0.002 112,500.00 247.50
Mandor OH 0.001 120,000.00 132.00
JUMLAH TENAGA KERJA 4,889.50
B BAHAN
Baja profil IWF 500 kg 1.100 22,000.00 24,200.00
Kawat las listrik kg 0.020 52,400.00 1,048.00
Aksesoris Baja Profil set 1.500 6,000.00 9,000.00
JUMLAH BAHAN 34,248.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 39,137.50


E Overhead & Profit 10% x D 3,913.75
F Harga Satuan Pekerjaan (D+E) 43,051.25
A. 7.1.6.2 Memasang 1 kg Gording Profil C
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.022 95,000.00 2,090.00
Tukang Las OH 0.022 110,000.00 2,420.00
Kepala tukang OH 0.002 112,500.00 247.50
Mandor OH 0.001 120,000.00 132.00
JUMLAH TENAGA KERJA 4,889.50
B BAHAN
Baja profil CNP 200 kg 1.100 22,000.00 24,200.00
Kawat las listrik kg 0.020 52,400.00 1,048.00
Aksesoris Baja Profil set 1.500 6,000.00 9,000.00
JUMLAH BAHAN 34,248.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 39,137.50


E Overhead & Profit 10% x D 3,913.75
F Harga Satuan Pekerjaan (D+E) 43,051.25

A. 7.1.6.12 Memasang atap genteng keramik


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.200 95,000.00 19,000.00
Tukang kayu OH 0.100 110,000.00 11,000.00
Kepala tukang OH 0.010 112,500.00 1,125.00
Mandor OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 32,325.00
B BAHAN
Kusen kayu Jati 6/10 cm m³ 0.005 63,741,000.00 318,705.00
Paku biasa 5 cm - 7 cm kg 1.000 16,700.00 16,700.00
JUMLAH BAHAN 335,405.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 367,730.00


E Overhead & Profit 10% x D 36,773.00
F Harga Satuan Pekerjaan (D+E) 404,503.00
A. 7.1.6.12 Memasang Lisplank
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.200 95,000.00 19,000.00
Tukang kayu OH 0.100 110,000.00 11,000.00
Kepala tukang OH 0.010 112,500.00 1,125.00
Mandor OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 32,325.00
B BAHAN
Genteng keramik Bh 13.000 15,000.00 195,000.00
Aksesoris Genteng set 1.100 30,000.00 33,000.00
JUMLAH BAHAN 228,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 260,325.00


E Overhead & Profit 10% x D 26,032.50
F Harga Satuan Pekerjaan (D+E) 286,357.50

A. 8.1.1 HARGA SATUAN PEKERJAAN PLAFOND


A. 8.1.6.4 Memasang 1 m2 Plafond Gypsum Jayaboard
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.300 95,000.00 28,500.00
Tukang Besi OH 0.350 110,000.00 38,500.00
Kepala tukang OH 0.035 112,500.00 3,937.50
Mandor OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 72,737.50
B BAHAN
Gypsum Board t.9 mm Jayaboard Lbr 0.350 67,000.00 23,450.00
Besi Hollow 60.60 M' 4.000 15,000.00 60,000.00
Paku Sekrup 3,5" bh 10.000 200.00 2,000.00
Penggantung Plafond Bh 2.000 7,000.00 14,000.00
JUMLAH BAHAN 99,450.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 172,187.50


E Overhead & Profit 10% x D 17,218.75
F Harga Satuan Pekerjaan (D+E) 189,406.25
A. 8.1.6.4 Memasang 1 m2 Plafond Akustik
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.100 95,000.00 9,500.00
Tukang Besi OH 0.100 110,000.00 11,000.00
Kepala tukang OH 0.010 112,500.00 1,125.00
Mandor OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 22,225.00
B BAHAN
Plafond Akustik m2 1.500 135,000.00 202,500.00
Besi Hollow 60.60 M' 3.800 15,000.00 57,000.00
Paku Sekrup 3,5" bh 10.000 200.00 2,000.00
Penggantung Plafond Bh 2.000 7,000.00 14,000.00
JUMLAH BAHAN 275,500.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 297,725.00


E Overhead & Profit 10% x D 29,772.50
F Harga Satuan Pekerjaan (D+E) 327,497.50

A. 8.1.6.4 Memasang 1 m2 Plafond GRC Super Panel


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.100 95,000.00 9,500.00
Tukang Besi OH 0.050 110,000.00 5,500.00
Kepala tukang OH 0.005 112,500.00 562.50
Mandor OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 16,162.50
B BAHAN
GRC Superpanel 9mm M2 0.350 145,000.00 50,750.00
Besi Hollow 60.60 M' 3.800 15,000.00 57,000.00
Paku Sekrup 3,5" bh 10.000 200.00 2,000.00
Penggantung Plafond Bh 2.000 7,000.00 14,000.00
JUMLAH BAHAN 123,750.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 139,912.50


E Overhead & Profit 10% x D 13,991.25
F Harga Satuan Pekerjaan (D+E) 153,903.75
A. 8.1.6.4 Memasang 1 m2 HPL
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.400 95,000.00 38,000.00
Tukang Kayu OH 0.400 110,000.00 44,000.00
Kepala tukang OH 0.040 112,500.00 4,500.00
Mandor OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 87,580.00
B BAHAN
Papan HPL m2 1.000 155,000.00 155,000.00
Plywood 4 mm Lbr 0.450 82,800.00 37,260.00
Paku Sekrup 3,5" bh 4.000 200.00 800.00
-
JUMLAH BAHAN 193,060.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 280,640.00


E Overhead & Profit 10% x D 28,064.00
F Harga Satuan Pekerjaan (D+E) 308,704.00

A. 8.1.6.4 Memasang 1 m2 Plafond Kayu Lambersering


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.800 95,000.00 76,000.00
Tukang Kayu OH 0.800 110,000.00 88,000.00
Kepala tukang OH 0.080 112,500.00 9,000.00
Mandor OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 177,800.00
B BAHAN
Kayu Banio ( Papan ) Klas I m³ 0.015 4,106,100.00 61,591.50
Paku biasa 5 cm - 7 cm kg 0.100 16,700.00 1,670.00
JUMLAH BAHAN 63,261.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 241,061.50


E Overhead & Profit 10% x D 24,106.15
F Harga Satuan Pekerjaan (D+E) 265,167.65
A. 8.1.6.10 Memasang 1 m list plafond Gypsum
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.050 95,000.00 4,750.00
Tukang Besi OH 0.050 110,000.00 5,500.00
Kepala tukang OH 0.005 112,500.00 562.50
Mandor OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 11,172.50
B BAHAN
Wall Angle m' 1.050 5,000.00 5,250.00
List Profil Gypsumb 5 cm M1 1.050 28,000.00 29,400.00
Paku biasa 5 cm - 7 cm kg 0.020 16,700.00 334.00
JUMLAH BAHAN 34,984.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 46,156.50


E Overhead & Profit 10% x D 4,615.65
F Harga Satuan Pekerjaan (D+E) 50,772.15

A. 9.1.1 HARGA SATUAN PEKERJAAN KERAMIK


A. 9.1.6.4 Pemasangan 1 m2 lantai ubin
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.700 95,000.00 66,500.00
Tukang batu OH 0.350 110,000.00 38,500.00
Kepala tukang OH 0.035 112,500.00 3,937.50
Mandor OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 113,137.50
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 113,137.50


E Overhead & Profit 10% x D 11,313.75
F Harga Satuan Pekerjaan (D+E) 124,451.25
A. 9.1.6.4 Material 1 m2 lantai ubin ukuran (60 x 60) cm
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Keramik 60 x 60 (Setara Roman) m2 1.100 240,000.00 264,000.00
Semen / PC (kg) Kg 9.600 1,020.00 9,792.00
Pasir Pasang (Sedang) m³ 0.045 300,000.00 13,500.00
Semen Warna (Tepung Affa) Kg 1.500 9,900.00 14,850.00
JUMLAH BAHAN 302,142.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 302,142.00


E Overhead & Profit 10% x D 30,214.20
F Harga Satuan Pekerjaan (D+E) 332,356.20

A. 9.1.6.11 Material 1 m2 lantai ubin ukuran (40 x 40) cm


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Keramik 40 x 40 (Setara Roman) m2 1.100 180,000.00 198,000.00
Semen / PC (kg) Kg 9.800 1,020.00 9,996.00
Pasir Pasang (Sedang) m³ 0.045 300,000.00 13,500.00
Semen Warna (Tepung Affa) Kg 1.300 9,900.00 12,870.00
JUMLAH BAHAN 234,366.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 234,366.00


E Overhead & Profit 10% x D 23,436.60
F Harga Satuan Pekerjaan (D+E) 257,802.60
A. 9.1.6.11 Material 1 m2 lantai ubin ukuran (30 X 60) cm
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Keramik 30 x 60 (Setara Roman) Bh 1.100 180,000.00 198,000.00
Semen / PC (kg) Kg 9.800 1,020.00 9,996.00
Pasir Pasang (Sedang) m³ 0.045 300,000.00 13,500.00
Semen Warna (Tepung Affa) Kg 1.300 9,900.00 12,870.00
JUMLAH BAHAN 234,366.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 234,366.00


E Overhead & Profit 10% x D 23,436.60
F Harga Satuan Pekerjaan (D+E) 257,802.60

A. 9.1.6.4 Pemasangan 1 m2 lantai Marmer


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 2.000 95,000.00 190,000.00
Tukang batu OH 1.000 110,000.00 110,000.00
Kepala tukang OH 0.500 112,500.00 56,250.00
Mandor OH 0.500 120,000.00 60,000.00
JUMLAH TENAGA KERJA 416,250.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 416,250.00


E Overhead & Profit 10% x D 41,625.00
F Harga Satuan Pekerjaan (D+E) 457,875.00
A. 9.1.6.11 Material 1 m2 lantai Marmer
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Keramik Marmer m2 1.350 1,200,000.00 1,620,000.00
Semen / PC (kg) Kg 9.800 1,020.00 9,996.00
Pasir Pasang (Sedang) m³ 0.045 300,000.00 13,500.00
Semen Warna (Tepung Affa) Kg 1.300 9,900.00 12,870.00
JUMLAH BAHAN 1,656,366.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 1,656,366.00


E Overhead & Profit 10% x D 165,636.60
F Harga Satuan Pekerjaan (D+E) 1,822,002.60

A. 9.1.6.29 Pemasangan 1m Plint Lantai


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.200 95,000.00 19,000.00
Tukang batu OH 0.200 110,000.00 22,000.00
Kepala tukang OH 0.100 112,500.00 11,250.00
Mandor OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 53,450.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 53,450.00


E Overhead & Profit 10% x D 5,345.00
F Harga Satuan Pekerjaan (D+E) 58,795.00
A. 9.1.6.29 Material 1m Plint Lantai
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Plint Keramik 10 x 40 Bh 2.600 4,400.00 11,440.00
Semen / PC (kg) Kg 1.140 1,020.00 1,162.80
Pasir Pasang (Sedang) m³ 0.003 300,000.00 900.00
Semen Warna (Tepung Affa) Kg 0.100 9,900.00 990.00
JUMLAH BAHAN 14,492.80
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 14,492.80


E Overhead & Profit 10% x D 1,449.28
F Harga Satuan Pekerjaan (D+E) 15,942.08

A. 9.1.6.11 Pemasangan 1m' Step Nosing


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.100 95,000.00 9,500.00
Tukang batu OH 0.100 110,000.00 11,000.00
Kepala tukang OH 0.050 112,500.00 5,625.00
Mandor OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 32,125.00
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 32,125.00


E Overhead & Profit 10% x D 3,212.50
F Harga Satuan Pekerjaan (D+E) 35,337.50
A. 9.1.6.11 Material 1m' Step Nosing
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Step Nosing Granit pjg = 30 cm Bh 4.000 16,956.23 67,824.90
Lem kayu kg 0.500 16,600.00 8,300.00
JUMLAH BAHAN 76,124.90
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 76,124.90


E Overhead & Profit 10% x D 7,612.49
F Harga Satuan Pekerjaan (D+E) 83,737.39

A. 9.1.6.11 Pemasangan 1m' Lis Keramik


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.050 95,000.00 4,750.00
Tukang batu OH 0.020 110,000.00 2,200.00
Kepala tukang OH 0.002 112,500.00 196.88
Mandor OH 0.002 120,000.00 210.00
JUMLAH TENAGA KERJA 7,356.88
B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 7,356.88


E Overhead & Profit 10% x D 735.69
F Harga Satuan Pekerjaan (D+E) 8,092.56

A. 9.1.6.11 Material Pemasangan Lis Keramik


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
List keramik m' 1.000 7,500.00 7,500.00
Semen / PC (kg) Kg 0.500 1,020.00 510.00
Pasir Pasang (Sedang) m³ 0.003 300,000.00 750.00
Semen Warna (Tepung Affa) Kg 0.065 9,900.00 643.50
JUMLAH BAHAN 9,403.50
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 9,403.50


E Overhead & Profit 10% x D 940.35
F Harga Satuan Pekerjaan (D+E) 10,343.85
A. 9.1.6.11 Memasang 1 m' Railing Tangga
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.050 95,000.00 4,750.00
Tukang Besi OH 0.050 110,000.00 5,500.00
Kepala tukang OH 0.010 112,500.00 1,125.00
Mandor OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 12,575.00
B BAHAN
Pipa baja Galvanis 2.5" m' 2.500 385,000.00 962,500.00
JUMLAH BAHAN 962,500.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 975,075.00


E Overhead & Profit 10% x D 97,507.50
F Harga Satuan Pekerjaan (D+E) 1,072,582.50

A. 10.1.1 HARGA SATUAN PEKERJAAN ELEKTRIKAL


A. 10.1.6.4 Memasang 1 Bh Saklar Tunggal Scneider
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Mekanik OH 0.500 100,000.00 50,000.00
Mekanik OH 0.500 110,000.00 55,000.00
Mandor OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 117,000.00
B BAHAN
Saklar Tunggal Schneider Bh 1.000 38,000.00 38,000.00
Klem Pipa Bh 1.000 2,000.00 2,000.00
JUMLAH BAHAN 40,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 157,000.00


E Overhead & Profit 10% x D 15,700.00
F Harga Satuan Pekerjaan (D+E) 172,700.00
A. 10.1.6.5 Memasang 1 Bh Saklar Ganda Scneider
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Mekanik OH 0.500 100,000.00 50,000.00
Mekanik OH 0.500 110,000.00 55,000.00
Mandor OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 117,000.00
B BAHAN
Saklar Ganda Schneider Bh 1.000 59,000.00 59,000.00
Klem Pipa Bh 1.000 2,000.00 2,000.00
JUMLAH BAHAN 61,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 178,000.00


E Overhead & Profit 10% x D 17,800.00
F Harga Satuan Pekerjaan (D+E) 195,800.00

A. 10.1.6.6 Memasang 1 Bh Stop Kontak Biasa Scneider


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Mekanik OH 0.500 100,000.00 50,000.00
Mekanik OH 0.500 110,000.00 55,000.00
Mandor OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 117,000.00
B BAHAN
Stop Kontak Schneider Bh 1.000 42,000.00 42,000.00
Klem Pipa Bh 1.000 2,000.00 2,000.00
JUMLAH BAHAN 44,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 161,000.00


E Overhead & Profit 10% x D 16,100.00
F Harga Satuan Pekerjaan (D+E) 177,100.00
A. 10.1.6.10 Memasang 1 Titik Pasang armature Lampu LG
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Mekanik OH 0.750 100,000.00 75,000.00
Mekanik OH 0.250 110,000.00 27,500.00
Mandor OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 114,500.00
B BAHAN
Lampu LG Type1 1 Bh 1.000 1,267,000.00 1,267,000.00
Fitting Plafond Bh 1.000 110,000.00 110,000.00
Pipa Listrik btng 3.000 4,000.00 12,000.00
Kabel NYM m 24.000 16,100.00 386,400.00
Tdus buah 3.000 1,800.00 5,400.00
Lbow buah 4.000 1,350.00 5,400.00
Las dop buah 3.000 500.00 1,500.00
Klem buah 24.000 900.00 21,600.00
JUMLAH BAHAN 1,809,300.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 1,923,800.00


E Overhead & Profit 10% x D 192,380.00
F Harga Satuan Pekerjaan (D+E) 2,116,180.00

A. 10.1.6.10 Memasang 1 Titik Pasang Panel Listrik


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Mekanik OH 1.000 100,000.00 100,000.00
Mekanik OH 0.500 110,000.00 55,000.00
Mandor OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 167,000.00
B BAHAN
Panel Kelistrikan Gedung bh 1.050 35,000,000.00 36,750,000.00
Kabel NYM m 15.000 16,100.00 241,500.00
Tdus buah 1.000 1,800.00 1,800.00
Lbow buah 2.000 1,350.00 2,700.00
Klem buah 24.000 900.00 21,600.00
Pipa Listrik btng 3.000 4,000.00 12,000.00
JUMLAH BAHAN 37,029,600.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 37,196,600.00


E Overhead & Profit 10% x D 3,719,660.00
F Harga Satuan Pekerjaan (D+E) 40,916,260.00
A. 10.1.6.10 Memasang 1 Titik Pasang Lampu Downlight
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Mekanik OH 0.750 100,000.00 75,000.00
Mekanik OH 0.250 110,000.00 27,500.00
Mandor OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 114,500.00
B BAHAN
Lampu Downlight Philips bh 1.050 90,000.00 94,500.00
Pipa Listrik btng 3.000 4,000.00 12,000.00
Kabel NYM m 24.000 -
Tdus buah 3.000 1,800.00 5,400.00
Lbow buah 4.000 1,350.00 5,400.00
Las dop buah 3.000 500.00 1,500.00
Klem buah 24.000 900.00 21,600.00
JUMLAH BAHAN 140,400.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 254,900.00


E Overhead & Profit 10% x D 25,490.00
F Harga Satuan Pekerjaan (D+E) 280,390.00

A. 10.1.6.10 Memasang 1 Titik Pasang Lampu Otomatis


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Mekanik OH 0.750 100,000.00 75,000.00
Mekanik OH 0.250 110,000.00 27,500.00
Mandor OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 114,500.00
B BAHAN
Lampu 20W Bh 1.000 85,000.00 85,000.00
Fitting Lampu Otomatis Bh 1.000 20,000.00 20,000.00
Pipa Listrik btng 3.000 4,000.00 12,000.00
Kabel NYM m 24.000 -
Tdus buah 3.000 1,800.00 5,400.00
Lbow buah 4.000 1,350.00 5,400.00
Las dop buah 3.000 500.00 1,500.00
Klem buah 24.000 900.00 21,600.00
JUMLAH BAHAN 150,900.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 265,400.00


E Overhead & Profit 10% x D 26,540.00
F Harga Satuan Pekerjaan (D+E) 291,940.00
A. 10.1.6.10 Memasang 1m' LED Strips
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Mekanik OH 0.500 100,000.00 50,000.00
Mekanik OH 0.100 110,000.00 11,000.00
Mandor OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 67,000.00
B BAHAN
LED Strips Philips m' 1.050 90,000.00 94,500.00
Klem buah 6.000 900.00 5,400.00
JUMLAH BAHAN 99,900.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 166,900.00


E Overhead & Profit 10% x D 16,690.00
F Harga Satuan Pekerjaan (D+E) 183,590.00

A. 10.1.6.10 Memasang 1m Instalasi Kabel Listrik


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pembantu Mekanik OH 0.010 100,000.00 1,000.00
Mekanik OH 0.010 110,000.00 1,100.00
Mandor OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 2,700.00
B BAHAN
Pipa Listrik btng 0.250 4,000.00 1,000.00
Kabel NYM m 1.100 16,100.00 17,710.00
Tdus buah 0.500 1,800.00 900.00
Lbow buah 0.500 1,350.00 675.00
Las dop buah 0.500 500.00 250.00
Klem buah 1.000 900.00 900.00
JUMLAH BAHAN 21,435.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 24,135.00


E Overhead & Profit 10% x D 2,413.50
F Harga Satuan Pekerjaan (D+E) 26,548.50
A. 6.1.6.2 Memasang 1m' Pipa Baja untuk struktur Kanopy
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.500 95,000.00 47,500.00
Tukang Pipa OH 0.500 110,000.00 55,000.00
Mandor OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 105,500.00
B BAHAN
Pipa baja Galvanis 2.5" m' 1.050 385,000.00 404,250.00
JUMLAH BAHAN 404,250.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 509,750.00


E Overhead & Profit 10% x D 50,975.00
F Harga Satuan Pekerjaan (D+E) 560,725.00

A. 6.1.6.2 Memasang 1m2 Kaca tempered


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.500 95,000.00 47,500.00
Tukang Besi OH 0.500 110,000.00 55,000.00
Mandor OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 105,500.00
B BAHAN
Kaca Tempered 10mm M2 1.050 530,000.00 556,500.00
JUMLAH BAHAN 556,500.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 662,000.00


E Overhead & Profit 10% x D 66,200.00
F Harga Satuan Pekerjaan (D+E) 728,200.00
HARGA SATUAN PEKERJAAN FINISHING
Pekerjaan 1m2 Pengecatan Kayu bidang Baru
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.070 95,000.00 6,650.00
Tukang cat OH 0.009 110,000.00 990.00
Kepala Tukang OH 0.006 112,500.00 675.00
Mandor OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,675.00
B BAHAN
Meni kayu - warna Kg 0.200 33,300.00 6,660.00
Plemer Kayu Kg 0.150 30,600.00 4,590.00
Cat Dasar TL Kg 0.170 27,000.00 4,590.00
Cat Kayu Merk Mowilex 1 Kg Kg 0.260 80,000.00 20,800.00
Kuas Bh 0.010 17,800.00 178.00
Thinner Ltr 0.030 19,700.00 591.00
Amplas M1 0.200 7,500.00 1,500.00
JUMLAH BAHAN 38,909.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 47,584.00


E Overhead & Profit 10% x D 4,758.40
F Harga Satuan Pekerjaan (D+E) 52,342.40

Pekerjaan 1m2 Pengecatan Dinding Baru Interior


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.020 95,000.00 1,900.00
Tukang cat OH 0.063 110,000.00 6,930.00
Kepala Tukang OH 0.006 112,500.00 708.75
Mandor OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 9,898.75
B BAHAN
Plemer Tembok Kg 0.100 28,300.00 2,830.00
Jotun Majestic Primer 20Ltr klng 0.010 950,000.00 9,500.00
Jotun Majestic True Beauty 20 Ltr klng 0.010 1,530,000.00 15,300.00
JUMLAH BAHAN 27,630.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 37,528.75


E Overhead & Profit 10% x D 3,752.88
F Harga Satuan Pekerjaan (D+E) 41,281.63
Pekerjaan 1m2 Pengecatan Dinding Roster
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.020 95,000.00 1,900.00
Tukang cat OH 0.063 110,000.00 6,930.00
Kepala Tukang OH 0.006 112,500.00 708.75
Mandor OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 9,898.75
B BAHAN
Cat Bata Ltr 0.300 120,000.00 36,000.00
JUMLAH BAHAN 36,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 45,898.75


E Overhead & Profit 10% x D 4,589.88
F Harga Satuan Pekerjaan (D+E) 50,488.63

Pekerjaan 1m2 Pengecatan Dinding Baru Exterior


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.020 95,000.00 1,900.00
Tukang cat OH 0.063 110,000.00 6,930.00
Kepala Tukang OH 0.006 112,500.00 708.75
Mandor OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 9,898.75
B BAHAN
Plemer Tembok Kg 0.100 28,300.00 2,830.00
JotaShield Primer 20Ltr klng 0.010 1,100,000.00 11,000.00
JotaShield Colour Extreme 20Ltr klng 0.015 1,400,000.00 21,000.00
JUMLAH BAHAN 34,830.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 44,728.75


E Overhead & Profit 10% x D 4,472.88
F Harga Satuan Pekerjaan (D+E) 49,201.63
Pekerjaan 1m2 Pengecatan Plafond
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.050 95,000.00 4,750.00
Tukang cat OH 0.090 110,000.00 9,900.00
Kepala Tukang OH 0.009 112,500.00 1,012.50
Mandor OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 16,022.50
B BAHAN
JotaShield Colour Extreme 20Ltr klng 0.015 1,400,000.00 21,000.00
JUMLAH BAHAN 21,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 37,022.50


E Overhead & Profit 10% x D 3,702.25
F Harga Satuan Pekerjaan (D+E) 40,724.75

Pekerjaan 1m2 Pengecatan Besi Profil dengan Menie Zinchromate


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.020 95,000.00 1,900.00
Tukang cat OH 0.200 110,000.00 22,000.00
Kepala Tukang OH 0.020 112,500.00 2,250.00
Mandor OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,450.00
B BAHAN
Cat besi Merk Nippon Paint 1 Kg kg 0.100 47,700.00 4,770.00
JUMLAH BAHAN 4,770.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 31,220.00


E Overhead & Profit 10% x D 3,122.00
F Harga Satuan Pekerjaan (D+E) 34,342.00
HARGA SATUAN PEKERJAAN TAMAN
Pekerjaan 1m2 Taman
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Tukang Batu OH 0.500 110,000.00 55,000.00
Mandor OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 55,300.00
B BAHAN
Rumput Gajah m2 1.100 50,000.00 55,000.00
Tanaman Hias Bh 1.000 20,000.00 20,000.00
JUMLAH BAHAN 75,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 130,300.00


E Overhead & Profit 10% x D 13,030.00
F Harga Satuan Pekerjaan (D+E) 143,330.00

HARGA SATUAN PEKERJAAN AIR HUJAN


Pekerjaan 1m3 Ijuk Untuk resapan
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 1.500 95,000.00 142,500.00
Mandor OH 0.150 120,000.00 18,000.00
JUMLAH TENAGA KERJA 160,500.00
B BAHAN
Ijuk kg 10.000 11,000.00 110,000.00
JUMLAH BAHAN 110,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 270,500.00


E Overhead & Profit 10% x D 27,050.00
F Harga Satuan Pekerjaan (D+E) 297,550.00

Pekerjaan 1m3 Kerikil Untuk Resapan


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 1.500 95,000.00 142,500.00
Mandor OH 0.150 120,000.00 18,000.00
JUMLAH TENAGA KERJA 160,500.00
B BAHAN
Kerikil/agregat Beton Kg 2,675.000 200.00 535,000.00
JUMLAH BAHAN 535,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 695,500.00


E Overhead & Profit 10% x D 69,550.00
F Harga Satuan Pekerjaan (D+E) 765,050.00
Pekerjaan 1m' PIPA PVC 6"
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.081 95,000.00 7,695.00
Tukang Batu OH 0.135 110,000.00 14,850.00
Kepala Tukang OH 0.014 112,500.00 1,518.75
Mandor OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 24,543.75
B BAHAN
Pipa PVC AW - Diameter 6 " M' 1.200 237,500.00 285,000.00
Aksesoris Pipa Talang set 1.050 83,125.00 87,281.25
JUMLAH BAHAN 372,281.25
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 396,825.00


E Overhead & Profit 10% x D 39,682.50
F Harga Satuan Pekerjaan (D+E) 436,507.50

Pekerjaan 1m' Talang 20cm


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 1.500 95,000.00 142,500.00
Mandor OH 0.150 120,000.00 18,000.00
JUMLAH TENAGA KERJA 160,500.00
B BAHAN
Talang 20cm M' 1.100 100,000.00 110,000.00
Aksesoris Pipa Talang set 1.000 83,125.00 83,125.00
JUMLAH BAHAN 193,125.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 353,625.00


E Overhead & Profit 10% x D 35,362.50
F Harga Satuan Pekerjaan (D+E) 388,987.50

Pekerjaan 1m' Buis Beton 40cm (U)


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.200 95,000.00 19,000.00
Mandor OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 21,400.00
B BAHAN
Buis Beton (U) 40cm m' 1.100 100,000.00 110,000.00
JUMLAH BAHAN 110,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 131,400.00


E Overhead & Profit 10% x D 13,140.00
F Harga Satuan Pekerjaan (D+E) 144,540.00
Pekerjaan 1m' Buis Beton 80cm (O)
Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.200 95,000.00 19,000.00
Mandor OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 21,400.00
B BAHAN
Buis Beton (O) 80cm m' 1.100 300,000.00 330,000.00
JUMLAH BAHAN 330,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 351,400.00


E Overhead & Profit 10% x D 35,140.00
F Harga Satuan Pekerjaan (D+E) 386,540.00

Pekerjaan 1m' Grill Gutter


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.100 95,000.00 9,500.00
Mandor OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 10,700.00
B BAHAN
Grill Gutter Penutup selokan m' 1.100 800,000.00 880,000.00
JUMLAH BAHAN 880,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 890,700.00


E Overhead & Profit 10% x D 89,070.00
F Harga Satuan Pekerjaan (D+E) 979,770.00

Pekerjaan 1m' Penutup Sumur Resapan


Jumlah Harga
No Uraian Satuan Koefisien Harga Satuan (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.200 95,000.00 19,000.00
Mandor OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 21,400.00
B BAHAN
Penutup Buis Beton buah 1.100 350,000.00 385,000.00
JUMLAH BAHAN 385,000.00
C PERALATAN

JUMLAH PERALATAN -

D JUMLAH (A+B+C) 406,400.00


E Overhead & Profit 10% x D 40,640.00
F Harga Satuan Pekerjaan (D+E) 447,040.00
DAFTAR HARGA SATUAN UPAH

PROGRAM : -
KEGIATAN : -
PEKERJAAN : -
LOKASI : -
TAHUN : -

HARGA SATUAN HARGA SATUAN


NO URAIAN UPAH KODE KETERANGAN
PER-HARI (Rp) PER-JAM (Rp)

1 Pekerja L01 95,000.00 13,571.43


2 Tukang L02 110,000.00 15,714.29
3 Kepala Tukang L03 112,500.00 16,071.43
4 Mandor L04 120,000.00 17,142.86
5 Juru ukur L05 115,000.00 16,428.57
6 Pembantu juru ukur L06 105,000.00 15,000.00
7 Ahli muda L07 - -
8 Ahli madya L08 - -
9 Ahli Utama L09 - - Upah dihitung dengan
10 Sopir / Driver L10 120,000.00 17,142.86 jumlah hari kerja di
asumsikan 26 hari dalam
11 Pembantu Sopir / Driver L11 100,000.00 14,285.71 sebulan. Jam kerja efektif
12 Operator L12 100,000.00 14,285.71 diasumsikan 7 jam sehari.
13 Pembantu Operator L13 100,000.00 14,285.71
14 Mekanik L14 110,000.00 15,714.29
15 Pembantu Mekanik L15 100,000.00 14,285.71
16 Desain engineer L16 150,000.00 21,428.57
17 Operator komputer/printer/ploter L17 100,000.00 14,285.71
18 Drafter Cad / Estimator L18 180,000.00 25,714.29
19 Penjaga malam L19 130,000.00 18,571.43
20 Juru Ukur/Drafter Cad/Estimator (D3) 190,000.00 27,142.86
21 Tukang Kayu 110,000.00 15,714.29
22 Tukang Batu 110,000.00 15,714.29
23 Tukang Besi 110,000.00 15,714.29
24 Tukang Cat 110,000.00 15,714.29
25 Tukang Pipa 110,000.00 15,714.29
26 Tukang Khusus Alumunium 130,000.00 18,571.43
27 Tukang Las 110,000.00 15,714.29
DAFTAR HARGA SATUAN BAHAN

PROGRAM : -
KEGIATAN : -
PEKERJAAN : -
LOKASI : -
TAHUN : -

BIAYA LANSIR, JUMLAH HARGA


NO URAIAN BAHAN KODE SATUAN HARGA SATUAN (Rp) KETERANGAN
TRANSPORTASI DLL SATUAN (Rp)

A KELOMPOK AIR,TANAH,BATU DAN SEMEN


1 Air M.02 Ltr 18.00 - 18.00
2 Pasir Pasang (Sedang) M01b m³ 300,000.00 - 300,000.00
3 Pasir Beton (Kasar) M01a kg 250.00 - 250.00
4 Pasir Halus (untuk HRS) M01c m³ 300,000.00 - 300,000.00
5 Pasir Urug M44 m³ 110,400.00 - 110,400.00
6 Batu Kali M02 m³ 268,000.00 - 268,000.00
7 Batu Belah M06 m³ 162,400.00 - 162,400.00
8 Batu Putih M07 m³ 255,000.00 - 255,000.00
9 Bahan Tanah Timbunan M08 m³ 45,000.00 - 45,000.00
10 Batu Telur Zak 50,000.00 - 50,000.00
11 Sirtu M16 m³ 137,200.00 - 137,200.00
12 Kerikil/agregat Beton M.06 Kg 200.00 - 200.00
13 Tanah liat M.17a m³ 110,500.00 - 110,500.00
14 Batu brojol (untuk bronjong) M02a m³ 170,400.00 - 170,400.00
15 Bahan Aditif (Caldbon, Strorox, dll) M.03 Ltr 50,400.00 - 50,400.00
16 Batu bata / merah bakar kelas I M.04.a Bh 900.00 - 900.00
17 Batu bata / merah bakar biasa M.04.b Bh 820.00 - 820.00
18 Batu bata / merah bakar kelas II M.04.c Bh 1,000.00 - 1,000.00
19 Bata Ekspose Bh 2,500.00 - 2,500.00
20 Semen / PC (50kg) M12 Zak 60,100.00 - 60,100.00
21 Semen / PC (kg) M12 Kg 1,020.00 - 1,020.00
22 Sika Top 107 Plus Pelapis 4.5 Set A+B klng 120,000.00 120,000.00
23 Semen Putih M12a kg 4,200.00 - 4,200.00
24 Semen Merah kg 7,700.00 - 7,700.00
25 Lem Rakol tube 15,700.00 - 15,700.00
26 Semen Warna (Tepung Affa) M.15b Kg 9,900.00 - 9,900.00
27 Plastik cor (Hitam) M23a M2 7,100.00 - 7,100.00
28 Lempengan rumput / Gebalan Rumput m³2 M2 25,000.00 - 25,000.00
29 Kapur M40 m³ 860,000.00 - 860,000.00
30 Bata Ringan 20 x 60 x 11 cm Bh 8,950.00 - 8,950.00
31 Bata Ringan 20 x 60 x 10 cm Bh 7,950.00 - 7,950.00
32 Bata Ringan 20 x 60 x 7.5 cm Bh 6,600.00 - 6,600.00
33 Bata Ringan Bh 10,700.00 - 10,700.00
34 Batako Bh 3,000.00 3,000.00
35 Roster Bh 13,500.00 13,500.00
36 Mill Plesteran kg 1,400.00 1,400.00
37 Batu Alam 10x20 m2 95,000.00 95,000.00
38 Ijuk kg 11,000.00 11,000.00
B KELOMPOK BAHAN BETON PABRIKASI
1 Beton ready mixed K-100 m³ 878,000.00 - 878,000.00
2 Beton ready mixed K-125 M.09a m³ 905,800.00 - 905,800.00
3 Beton ready mixed K-150 M.09b m³ 912,500.00 - 912,500.00
4 Beton ready mixed K-175 M.09c m³ 970,100.00 - 970,100.00
5 Beton ready mixed K-200 M.09d m³ 957,500.00 - 957,500.00
6 Beton ready mixed K-225 M.09e m³ 1,045,100.00 - 1,045,100.00
7 Beton ready mixed K-250 M.09f m³ 1,047,800.00 - 1,047,800.00
8 Beton ready mixed K-275 M.09g m³ 1,100,800.00 - 1,100,800.00
9 Beton ready mixed K-300 M.09h m³ 1,138,100.00 - 1,138,100.00
10 Beton ready mixed K-350 M.09i m³ 1,194,500.00 - 1,194,500.00
11 Beton ready mixed K-400 M.09j m³ 1,244,800.00 - 1,244,800.00
12 Beton ready mixed K-450 M.09k m³ 1,339,100.00 - 1,339,100.00
13 Beton ready mixed K-500 M.09l m³ 1,391,100.00 - 1,391,100.00
14 Buis Beton (U) 40cm m' 100,000.00 - 100,000.00
15 Buis Beton (O) 80cm m' 300,000.00 - 300,000.00
15 Penutup Buis Beton buah 350,000.00 - 350,000.00
16 Hollow Brick (H.15) Bh 3,600.00 - 3,600.00
17 Hollow Brick (H.10) Bh 3,300.00 - 3,300.00
18 Hollow Brick (H.20) Bh 5,000.00 - 5,000.00
19 Jubin Warna 20 x 20 (Setara Asia Tile) Bh 5,500.00 - 5,500.00
20 Jubin Warna 30 x 30 (Setara Asia Tile) Bh 10,500.00 - 10,500.00
21 Jubin Warna 40 x 40 Bh 15,000.00 - 15,000.00
22 Granit 40 x 40 (pearls white, Setara Granito) Bh 64,515.00 - 64,515.00
23 Granit 40 x 40 (pearls white, Setara Granito) Bh 64,515.00 - 64,515.00
24 Granit 60 x 60 (silver pearls, Setara Granito) Bh 126,500.00 - 126,500.00
25 Granit 60 x 60 (silver pearls, Setara Granito) Bh 126,500.00 - 126,500.00
26 Granit 30 x 30 (silver pearls, Setara Granito) Bh 35,190.00 - 35,190.00
27 Granit 30 x 30 (silver pearls, Setara Granito) Bh 35,190.00 - 35,190.00
28 Granit 40 x 40 (Setara Ikad ) Bh 35,190.00 - 35,190.00
29 Keramik 33 x 33 (Asia Tile) Doos 68,000.00 - 68,000.00
30 Keramik 60 x 60 (Setara Roman) m2 240,000.00 - 240,000.00
31 Keramik 40 x 40 (Asia Tile) Bh 11,300.00 - 11,300.00
32 Keramik 40 x 40 (Setara Roman) m2 180,000.00 - 180,000.00
33 Keramik 30 x 60 (Setara Roman) Bh 180,000.00 - 180,000.00
34 Keramik 20 x 20 (Setara Roman) Bh 3,600.00 - 3,600.00
35 Keramik, Lantai 60 x 60 Bh 18,000.00 - 18,000.00
36 Keramik, Lantai 40 x 40 Doos 57,000.00 - 57,000.00
37 Keramik, Lantai 30 x 30 Doos 60,000.00 - 60,000.00
38 Keramik, Lantai 20 x 20 Doos 62,000.00 - 62,000.00
39 Keramik, dinding 20 x 40 Bh 7,700.00 - 7,700.00
40 Keramik, dinding 20 x 25 Bh 4,600.00 - 4,600.00
41 Keramik, dinding 20 x 20 Bh 3,900.00 - 3,900.00
42 Plint Keramik 10 x 40 Bh 4,400.00 - 4,400.00
43 Plint Keramik 10 x 30 Bh 4,000.00 - 4,000.00
44 Plint Keramik 10 x 20 Bh 3,500.00 - 3,500.00
45 Plint Keramik 10 x 10 Bh 3,000.00 - 3,000.00
46 Plint Keramik 5 x 20 Bh 6,000.00 - 6,000.00
47 Plint Vynil Karet ukuran 15 Cm x 30 Cm Bh 57,500.00 - 57,500.00
48 Step Nosing Granit pjg = 60 cm Bh 47,300.00 - 47,300.00
49 Step Nosing Granit pjg = 40 cm Bh 22,165.00 - 22,165.00
50 Step Nosing Granit pjg = 30 cm Bh 16,956.23 - 16,956.23
51 Batu Andesit M2 236,500.00 - 236,500.00
52 Internal cove Bh 9,500.00 - 9,500.00
53 Bon-bon Keramik M' 7,900.00 - 7,900.00
54 Floor hardener Kg 32,500.00 - 32,500.00
55 Pintu Angin Ukuran ( Rooster 20 x 20 cm) Bh 10,300.00 - 10,300.00
56 Pintu Angin Ukuran ( Rooster 25 x 25 cm) Bh 14,800.00 - 14,800.00
57 Cuka Bibit Liter 52,000.00 - 52,000.00
58 List Keramik m' 7,500.00 - 7,500.00
59 Keramik Marmer m2 1,200,000.00 1,200,000.00
C KELOMPOK BAHAN KAYU
1 Bambu dia 2", pjg 6m btg 7,500.00 - 7,500.00
2 Bambu dia 3-4", pjg 6-8m btg 15,000.00 - 15,000.00
3 Dolken kayu galam dia 10 cm, pjg 4 m (Perancah) btg 34,000.00 - 34,000.00
4 Dolken kayu galam dia 8-10 cm, pjg 4 m (Perancah) btg 22,000.00 - 22,000.00
5 Ijuk kg 21,400.00 - 21,400.00
6 Kayu Banio ( Papan ) Klas I m³ 4,106,100.00 - 4,106,100.00
7 Kayu Banio ( Balok) Klas I m³ 4,035,700.00 - 4,035,700.00
8 Kayu Marsawa ( Papan ) Klas II m³ 3,106,000.00 - 3,106,000.00
9 Kayu Marsawa ( Balok ) Klas II m³ 3,029,100.00 - 3,029,100.00
10 Kayu Merantih ( Papan ) Klas III m³ 2,582,700.00 - 2,582,700.00
11 Kayu Merantih ( Balok ) Klas III m³ 2,426,600.00 - 2,426,600.00
12 Kayu untuk Perancah Kayu Klas III m³ 1,949,000.00 - 1,949,000.00
13 Kayu Bekisting ( Papan ) Klas IV m³ 1,890,600.00 - 1,890,600.00
14 Kayu Bekisting ( Balok ) Klas IV m³ 1,962,100.00 - 1,962,100.00
15 Kayu Acuan M99 m³ 2,169,700.00 - 2,169,700.00
16 Kayu Perancah 5/7 Cm M.37.b m³ 2,700,000.00 - 2,700,000.00
17 Dolken Ø-8 cm-4 m btg 45,500.00 - 45,500.00
18 Penjaga jarak bekising/spacer btg 19,500.00 - 19,500.00
19 Kayu reng 2 x 3 kelas 2 m³ 3,029,100.00 - 3,029,100.00
20 Multiplek tebal 6 mm Lbr 88,500.00 - 88,500.00
21 Multiplek tebal 9 mm Lbr 123,000.00 - 123,000.00
22 Multipleks 12 mm M73 Lbr 170,600.00 - 170,600.00
23 Multiplek tebal 18 mm Lbr 252,600.00 - 252,600.00
24 Plywood 4 mm Lbr 82,800.00 - 82,800.00
25 Plywood 9 mm Lbr 123,000.00 - 123,000.00
26 Phenol film 12 mm Lbr 215,000.00 - 215,000.00
27 Teakwood 3mm 120 x 240 Lbr 90,000.00 - 90,000.00
28 Triflex t= 3mm Lbr 52,600.00 - 52,600.00
29 Triflex t= 4mm Lbr 65,000.00 - 65,000.00
30 Triflex t= 6mm Lbr 87,500.00 - 87,500.00
31 Triflex Jati t = 3 mm Lbr 98,300.00 - 98,300.00
32 Triflex jati t = 4 mm Lbr 100,000.00 - 100,000.00
33 Triflex jati t = 6 mm Lbr 146,600.00 - 146,600.00
34 Lamberseering M' 16,600.00 - 16,600.00
35 Papan Lamberseering btg 19,100.00 - 19,100.00
36 Les Profil (3x3.5x400) M' 16,700.00 - 16,700.00
37 Les kaca (1x3x400) M' 12,000.00 - 12,000.00
38 Lem kayu kg 16,600.00 - 16,600.00
39 Jendela naco ( 15 x 90 ) cm + Rangka Bh 189,100.00 - 189,100.00
40 Gypsum Board t.9 mm Jayaboard Lbr 67,000.00 - 67,000.00
41 Formika Lbr 103,800.00 - 103,800.00
42 Selinder (cisa) Bh 156,200.00 - 156,200.00
43 Door Closer Bh 225,000.00 - 225,000.00
44 Door Stoper Bh 70,000.00 - 70,000.00
45 List Profil Gypsumb 5 cm M1 28,000.00 - 28,000.00
46 GRC Superpanel 9mm M2 145,000.00 - 145,000.00
47 Kayu Jati Balok 6/10 m³ 4.00 - 4.00
48 Plafond Akustik m2 135,000.00 - 135,000.00
49 Kusen kayu Jati 6/10 cm m³ 63,741,000.00 - 63,741,000.00
50 Papan Kayu Jati tebal 4 cm m³ 63,741,000.00 - 63,741,000.00
D KELOMPOK BAHAN LOGAM
1 Baja pelat tebal 2 mm M2 470,000.00 - 470,000.00
2 Baja pelat tebal 3 mm M2 725,000.00 - 725,000.00
3 Baja pelat tebal 5 mm M2 1,100,000.00 - 1,100,000.00
4 Besi strip kg 12,100.00 - 12,100.00
5 Baja profil IWF Ex. Jepang kg 14,500.00 - 14,500.00
6 Baja profil IWF 500 kg 22,000.00 - 22,000.00
7 Baja profil CNP 200 kg 22,000.00 - 22,000.00
8 Baja Tulangan(Polos) U32 M57a Kg 14,600.00 - 14,600.00
9 Baja Tulangan(Ulir) D39 m³9c Kg 16,800.00 - 16,800.00
10 Baja Tulangan(Ulir) D48 m³9d Kg 17,600.00 - 17,600.00
11 Baja Tulangan U 24 (besi Beton biasa) polos m³9a Kg 12,000.00 - 12,000.00
12 Baja Tulangan U 32 Polos m³9b Kg 14,600.00 - 14,600.00
13 Pipa Baja M52 M' 80,000.00 - 80,000.00
14 Pipa Porus M25 M' 93,800.00 - 93,800.00
15 Pipa Galvanis Dia 3" M24a M 190,600.00 - 190,600.00
16 Pipa Galvanis Dia 1,5" M24b M 39,000.00 - 39,000.00
17 Casing M100 M2 14,200.00 - 14,200.00
18 Baja Bergelombang M46 Kg 16,500.00 - 16,500.00
19 Baja Struktur M48 Kg 17,600.00 - 17,600.00
20 Baut dia 10 mm panjang 5 cm Bh 3,000.00 - 3,000.00
21 Baut dia 10 mm panjang 10 cm Bh 5,000.00 - 5,000.00
22 Baut dia 12 mm panjang 5 cm Bh 4,000.00 - 4,000.00
23 Baut dia 12 mm panjang 10 cm Bh 7,500.00 - 7,500.00
24 Baut dia 12 mm panjang 18 cm Bh 7,500.00 - 7,500.00
25 Baut dia 12 mm panjang 20 cm Bh 7,000.00 - 7,000.00
26 Baut Bangunan 12 cm Bh 4,000.00 - 4,000.00
27 Baut Bangunan 25 cm Bh 8,000.00 - 8,000.00
28 Baut Bangunan 30 cm Bh 9,000.00 - 9,000.00
29 Baut Bangunan 50 cm Bh 10,500.00 - 10,500.00
30 Baut baja ringan per 50 biji Bh 200.00 - 200.00
31 Baut Hitam 3/8 x 3 Bh 2,000.00 - 2,000.00
32 Baut Seng 1/4 x 1 Bh 650.00 - 650.00
33 Baut Seng 1/4 x 1 1/2 Bh 800.00 - 800.00
34 Baut Seng 1/4 x 2 1/2 Bh 1,000.00 - 1,000.00
35 Baut Seng 1/4 x 3/4 Bh 500.00 - 500.00
36 Baut Seng 1/4 x 5/8 Bh 400.00 - 400.00
37 Baut Seng 3/16 x 1 1/2 Bh 750.00 - 750.00
38 Baut Seng 3/16 x 1 1/4 Bh 600.00 - 600.00
39 Baut Seng 3/16 x 2 Bh 850.00 - 850.00
40 Begel 10 x 10 kg 18,000.00 - 18,000.00
41 Begel 10 x 15 kg 18,000.00 - 18,000.00
42 Begel 8 x 8 kg 18,000.00 - 18,000.00
43 Belokan Talang Biasa Bh 14,000.00 - 14,000.00
44 BESI Beton Polos SNI (deform/ulir) 10mm, P12 m, kg/meter Lonjor 90,500.00 - 90,500.00
45 BESI Beton Polos SNI (deform/ulir) 12 mm, P12m, kg/meter Lonjor 149,700.00 - 149,700.00
46 BESI Beton Polos SNI (deform/ulir) 12 mm, P12m, kg/meter Lonjor 227,500.00 - 227,500.00
47 BESI Beton Polos SNI (gemuk) Dia 10mm, P 12 m, kg/meter Lonjor 81,000.00 - 81,000.00
48 BESI Beton Polos SNI (gemuk) Dia 6mm, P 12 m, kg/meter Lonjor 36,000.00 - 36,000.00
49 BESI Beton Polos SNI (gemuk) Dia 8mm, P 12 m, kg/meter Lonjor 58,000.00 - 58,000.00
50 BESI Beton Polos SNI (kurus) Dia 12mm, P 12 m, kg/meter Lonjor 107,000.00 - 107,000.00
51 BESI Beton Polos SNI (kurus) Dia 6mm, P 12 m, kg/meter Lonjor 29,000.00 - 29,000.00
52 BESI Beton Polos SNI (kurus) Dia 8mm, P 12 m, kg/meter Lonjor 47,000.00 - 47,000.00
53 Besi Beton M13 Kg 10,100.00 - 10,100.00
54 Besi Hollow 60.60 M' 15,000.00 15,000.00
55 Besi Hollow 50.50.3 M' 50,900.00 - 50,900.00
56 Besi hollow 40.40.2 M' 26,900.00 - 26,900.00
57 Besi Ulir kg 10,500.00 - 10,500.00
58 Besi Siku L 30.30.3 kg 14,100.00 - 14,100.00
59 Besi siku L.40.40.4 kg 14,100.00 - 14,100.00
60 Betel /buah Bh 15,000.00 - 15,000.00
61 Bubungan asbes gelombang Bh 38,000.00 - 38,000.00
62 Bubungan merk godean Bh 5,000.00 - 5,000.00
63 Buis Beton Diameter 60 cm Bh 60,000.00 - 60,000.00
64 Buis Beton Diameter 80 cm /buah Bh 80,000.00 - 80,000.00
65 Cathut /buah Bh 38,000.00 - 38,000.00
66 Cethok /buah Bh 11,000.00 - 11,000.00
67 Dextone Plastik Steel Bh 19,000.00 - 19,000.00
68 Dextone Silicone Sealant 70 gr Bh 19,000.00 - 19,000.00
69 Dynabolt/raamset dia 8 mm panjang 4-5 cm Bh 30,300.00 - 30,300.00
70 Dinabol 10 x 50 Bh 2,000.00 - 2,000.00
71 Dinabol 10 x 65 Bh 1,500.00 - 1,500.00
72 Dinabol 10 x 77 Bh 2,500.00 - 2,500.00
73 Dinabol 10 x 97 Bh 4,000.00 - 4,000.00
74 Dinabol 12 x 60 Bh 4,000.00 - 4,000.00
75 Dinabol 12 x 70 Bh 5,500.00 - 5,500.00
76 Dinabol 12 x 94 Bh 6,000.00 - 6,000.00
77 Dinabol 16 x 147 Bh 23,000.00 - 23,000.00
78 Matras Concrete M85 Bh 521,800.00 - 521,800.00
79 Kawat Beton / Bendrat M14 Kg 17,100.00 - 17,100.00
80 Kawat bronjong M.68 Kg 26,200.00 - 26,200.00
81 Kawat Jaring Galvanis Kg 26,200.00 - 26,200.00
82 Kawat las listrik kg 52,400.00 - 52,400.00
83 Kawat las listrik M51 Dos 156,600.00 - 156,600.00
84 Kawat seng 3 mm kg 25,800.00 - 25,800.00
85 Kawat duri m 13,100.00 - 13,100.00
86 Paku biasa 1 cm - 4 cm M18 Kg 16,700.00 - 16,700.00
87 Paku biasa 5 cm - 7 cm kg 16,700.00 - 16,700.00
88 Paku pjg 10 cm - 12 cm kg 16,700.00 - 16,700.00
89 Paku seng gelombang kg 26,300.00 - 26,300.00
90 Paku Pancing 6 x 23 kg 36,600.00 - 36,600.00
91 Paku Sekrup 3,5" bh 200.00 - 200.00
92 Paku Atap Genteng 1/2"-1" Dus 20,000.00 - 20,000.00
93 Aksesoris Genteng set 30,000.00 - 30,000.00
94 Pintu lipat/Folding Gate 1 Mm M2 950,000.00 - 950,000.00
95 SunScreent alluminium M2 450,000.00 - 450,000.00
96 Rolling door allmunium M2 450,000.00 - 450,000.00
97 Profil alluminium M' 110,000.00 - 110,000.00
98 Pintu Alluminium M' 350,000.00 - 350,000.00
99 Alluminium strip M' 35,000.00 - 35,000.00
100 Skrup fixer Bh 7,500.00 - 7,500.00
101 Sealant (Lem Silicont) Tube 8,000.00 - 8,000.00
102 Profil kaca M' 45,500.00 - 45,500.00
103 Seng plat BJLS-30 lebar 0,6 M' lmbr 70,000.00 - 70,000.00
104 Seng plat lebar 0,9 M' t=0,02 lmbr 45,000.00 - 45,000.00
105 Seng plat lebar 0,9 M' t=0,025 lmbr 51,800.00 - 51,800.00
106 Seng plat lebar 0,9 M' t=0,03 lmbr 65,600.00 - 65,600.00
107 Wiremesh untuk pelat Lantai Beton kg 13,100.00 - 13,100.00
108 Kawat Nyamuk M2 15,000.00 - 15,000.00
109 Rangka Atap Baja Ringan M2 145,000.00 - 145,000.00
110 Rangka Atap Metal Furing M2 125,000.00 - 125,000.00
111 Bronjong Pabrikasi t.2.7 mm Bh 300,000.00 - 300,000.00
112 Bronjong Pabrikasi t.3mm Bh 340,000.00 - 340,000.00
113 Tangga Putar dan Bordes Bh 2,500,000.00 - 2,500,000.00
114 Pipa baja Galvanis 2.5" m' 385,000.00 - 385,000.00
115 Aksesoris Baja Profil set 6,000.00 - 6,000.00
116 Grill Gutter penutup selokan m' 800,000.00 - 800,000.00
E KELOMPOK BAHAN ATAP
1 Atap Seng BJLS 0.20 x 3' x 6' bd 9 Lbr 47,000.00 - 47,000.00
2 Atap Seng BJLS 0.30 x 3' x 6' bd 9 Lbr 55,200.00 - 55,200.00
3 Atap Seng BJLS 0.20 x 3' x 6' bd 11 Lbr 49,900.00 - 49,900.00
4 Atap Seng BJLS 0.30 x 3' x 6' bd 11 Lbr 76,000.00 - 76,000.00
5 Atap Platik Warna Putih Arcylic Lbr 94,300.00 - 94,300.00
6 Atap Plastik Fiber Class Lbr 123,300.00 - 123,300.00
7 Asbes 1000 x 1000 x 3 mm /lembar Lbr 15,000.00 - 15,000.00
8 Asbes 2400 x 1200 x 3 mm /lembar Lbr 50,000.00 - 50,000.00
9 Asbes gelombang kecil uk. 1800 x 1050 x 4 mm /lembar Lbr 50,000.00 - 50,000.00
10 Asbes gelombang kecil uk. 2100 x 1050 x 4 mm /lembar Lbr 58,000.00 - 58,000.00
11 Asbes gelombang kecil uk. 2400 x 1050 x 4 mm /lembar Lbr 62,000.00 - 62,000.00
12 Asbes gelombang kecil uk. 3000 x 1050 x 4 mm /lembar Lbr 89,000.00 - 89,000.00
13 Asbes gelombang besar uk. 1800 x 1050 x 4 mm /lembar Lbr 82,500.00 - 82,500.00
14 Asbes gelombang besar uk. 2100 x 1050 x 4 mm /lembar Lbr 86,000.00 - 86,000.00
15 Asbes gelombang besar uk. 2400 x 1050 x 4 mm /lembar Lbr 98,000.00 98,000.00
16 Asbes gelombang besar uk. 3000 x 1050 x 4 mm /lembar Lbr 130,000.00 130,000.00
17 Asbes gelombang uk 92 x 250 Lbr - - -
18 Asbes semen Lbr 35,000.00 - 35,000.00
19 Genteng palentong Lbr - - -
20 Genteng kodok Lbr - - -
21 Genteng keramik Bh 15,000.00 15,000.00
22 Nok paten 92 cm Lbr - - -
23 Genteng Beton Lbr - - -
24 Genteng aspal Lbr - - -
25 Genteng Metal Lbr - - -
26 Atap Seng Warna Tebal 0.20 11 bd merk Swan Brand/Gjh. Berlian Lbr 108,200.00 - 108,200.00
27 Atap Seng Warna Tebal 0.20 11 bd merk Gold Fish/Swallow Lbr 53,000.00 - 53,000.00
28 Genteng Metal ( Polycolor ) 0.20 cm Lbr 59,400.00 - 59,400.00
29 Genteng Metal ( Polycolor ) 0.30 cm Lbr 57,500.00 - 57,500.00
30 Atap Asbes Gelombang Lbr 48,500.00 - 48,500.00
31 Perabung Seng Plat BJLS 20 Lbr 27,800.00 - 27,800.00
32 Perabung Seng Plat BJLS 30 Lbr 39,900.00 - 39,900.00
33 Seng Plat BJLS 20 Lbr 48,200.00 - 48,200.00
34 Seng Plat BJLS 30 Lbr 64,500.00 - 64,500.00
35 Perabung Abes Lbr 23,100.00 - 23,100.00
36 Perabung Geteng metal Lbr 30,000.00 - 30,000.00
37 Seng Plat BJLS 20 Warna Lbr 65,000.00 - 65,000.00
38 Seng Plat BJLS 30 Warna Lbr - - -
39 Genteng Bitumen Selusa Uk. 160 cm x 40 cm Lembar 47,500.00 - 47,500.00
40 Asesoris Nok/Ridge Lembar 82,500.00 - 82,500.00
41 Nok Asesoris Flashing Samping/Verge Piece Lembar 76,800.00 - 76,800.00
42 Atap Bitumen Bergelombang 3 mm H 38 Lembar 152,500.00 - 152,500.00
43 Screw Bh 1,000.00 - 1,000.00
44 Angkong Bh 600,000.00 - 600,000.00
45 Galvalum 0,3 x 60 Bh 36,500.00 - 36,500.00
46 Galvalum 0,3 x 70 Bh 41,500.00 - 41,500.00
47 Galvalum 0,3 x 90 Bh 46,500.00 - 46,500.00
48 Galvanis DIA 1 1/2" / 4 meter Lonjor 157,000.00 - 157,000.00
49 Galvanis DIA 1" / 4 meter Lonjor 115,000.00 - 115,000.00
50 Galvanis DIA 1/2" / 4 meter Lonjor 78,000.00 - 78,000.00
51 Solar flat lmbr - -
52 Papan HPL m2 155,000.00 - 155,000.00
F KELOMPOK BAHAN KACA
1 Kaca Polos Tebal 3 mm M2 93,700.00 - 93,700.00
2 Kaca Polos Tebal 5 mm M2 104,400.00 - 104,400.00
3 Kaca Polos Tebal 8 mm M2 206,000.00 - 206,000.00
4 Kaca Polos Tebal 12 mm M2 195,000.00 - 195,000.00
5 Kaca Raiben Tebal 3 mm M2 178,500.00 - 178,500.00
6 Kaca Raiben Tebal 5 mm M2 228,300.00 - 228,300.00
7 Raso Tebal 3 mm M2 - - -
8 Raso Tebal 5 mm M2 - - -
9 Kaca Es Tebal 3 mm M2 - - -
10 Kaca Es Tebal 5 mm M2 - - -
11 Kaca Naco Polos ( 15 x 90 ) cm + Rangka M2 240,000.00 - 240,000.00
12 Kaca Tempered 10mm M2 530,000.00 - 530,000.00
G KELOMPOK PENGGANTUNG / PENGUNCI
1 Merk Jangkar 9702 RRC/692 LD/MAXEL/KODAI/dll Set 99,200.00 - 99,200.00
2 Jangkar 746/Kodai/dll Set 87,500.00 - 87,500.00
3 Merk Ciga Brown 5404 Set 136,800.00 - 136,800.00
4 Merk Ciga Brown 5009 Set - - -
5 Kunci Tanam Set 90,000.00 - 90,000.00
6 Kunci Antik A/C Itali/Seiss Set 259,200.00 - 259,200.00
7 Kunci Shanghai 9702 LD Set 90,300.00 - 90,300.00
8 Grendel Antik 2 Set 14,400.00 - 14,400.00
9 Tarikan Antik Jendela Set 14,600.00 - 14,600.00
10 Engsel Nylon Set 19,400.00 - 19,400.00
11 Engsel Lokal Set 14,100.00 - 14,100.00
12 Engsel 4" (Kuningan) Set 24,500.00 - 24,500.00
13 Engsel 4' (Biasa) Set 19,500.00 - 19,500.00
14 Engsel 3" (Kuningan) Set 20,700.00 - 20,700.00
15 Engsel 3" (Biasa) Set 14,300.00 - 14,300.00
16 Engsel 4" merk HPP Bh 18,500.00 - 18,500.00
17 Engsel Tipis 2" + Sekrup Merk GDO Bh 6,500.00 - 6,500.00
18 Engsel Tipis 2,5" Merk GDO Bh 2,500.00 - 2,500.00
19 Fisher 10 Ecer Bh 700.00 - 700.00
20 Fisher 12 Ecer Bh 750.00 - 750.00
21 Hak Angin unit 18,400.00 - 18,400.00
22 Handle Pintu (cisa) Unit 103,700.00 - 103,700.00
23 Kunci Mandili 450 Itali/Seiss Set 258,100.00 - 258,100.00
24 Kunci Lemari Set 15,000.00 - 15,000.00
25 Penggantung Plafond Bh 7,000.00 - 7,000.00
26 Wall Angle m' 5,000.00 - 5,000.00
H KELOMPOK BAHAN BAKAR, MINYAK, DAN CAT
1 Autosol Besar Bh 24,000.00 - 24,000.00
2 Aqua Proof kg 55.00 - 55.00
3 Amplas M1 7,500.00 - 7,500.00
4 Cat besi Merk EMCO BINTANG 1 Kg kg 86,000.00 - 86,000.00
5 Cat besi Merk EMCO SEGITIGA 1 Kg kg 74,000.00 - 74,000.00
6 Cat besi Merk EMCO STANDARD 1 Kg kg 67,000.00 - 67,000.00
7 Cat besi Merk Kansai Paint 1 Kg kg 67,500.00 - 67,500.00
8 Cat besi Merk Nippon Paint 1 Kg kg 47,700.00 - 47,700.00
9 Cat Dasar TL Kg 27,000.00 - 27,000.00
10 Cat Kayu Merk Mowilex 1 Kg Kg 80,000.00 - 80,000.00
11 Cat Kayu Merk Propan Aqua Wood Filler 1 Kg Kg 33,000.00 - 33,000.00
12 Cat Minyak Merk Mowilex /liter Liter 22,000.00 - 22,000.00
13 Cat Minyak M42 Kg 52,400.00 - 52,400.00
14 Jotun Majestic Primer 20Ltr klng 950,000.00 - 950,000.00
15 JotaShield Colour Extreme 20Ltr klng 1,400,000.00 - 1,400,000.00
16 JotaShield Primer 20Ltr klng 1,100,000.00 - 1,100,000.00
17 Jotun Majestic True Beauty 20 Ltr klng 1,530,000.00 - 1,530,000.00
18 Cat tembok Merk Dulux 1 Kg Kg 57,000.00 - 57,000.00
19 Cat tembok Merk DECOLITH 1 Kg Kg 33,500.00 - 33,500.00
20 Cat tembok Merk Envi 1 Kg Kg 36,500.00 - 36,500.00
21 Cat tembok Merk Maxilite 1 Kg Kg 67,000.00 - 67,000.00
22 Cat tembok Merk Maxilite 1 Kg Kg 30,000.00 - 30,000.00
23 Cat tembok Merk Nippon Paint 1 Kg Kg 44,000.00 - 44,000.00
24 Cat Ultra Politur Kg 57,800.00 - 57,800.00
25 Dexlite Ltr 7,300.00 - 7,300.00
26 Dempul Kg 25,600.00 - 25,600.00
27 Ember cor besar /buah Bh 11,500.00 - 11,500.00
28 Ember cor kecil /buah Bh 7,500.00 - 7,500.00
29 Ember cor lebar /buah Bh 17,000.00 - 17,000.00
30 Fox Kuning Galon 14kg Kg 51,785.71 - 51,785.71
31 Kuas Bh 17,800.00 - 17,800.00
32 Kerosen / Minyak Tanah M11 Ltr 8,800.00 - 8,800.00
33 Meni kayu - warna Kg 33,300.00 - 33,300.00
34 Meni besi - warna Kg 33,800.00 - 33,800.00
35 Minyak Pelumas / Olie M22 Ltr 35,000.00 - 35,000.00
36 Multi Seal Cat Seng Kg 67,000.00 - 67,000.00
37 Minyak Cat Ltr 14,300.00 - 14,300.00
38 Minyak bekisting Ltr 13,800.00 - 13,800.00
39 Nagaltex Cat Tembok/Sanalux Kg 44,000.00 - 44,000.00
40 Platone Cat Besi Kg 52,500.00 - 52,500.00
41 Plemer Kayu Kg 30,600.00 - 30,600.00
42 Plemer Tembok Kg 28,300.00 - 28,300.00
43 Platone Cat Tembok/Digatex/dll Kg 40,000.00 - 40,000.00
44 Premium non subsidi / Pertalite M20 Ltr 7,500.00 - 7,500.00
45 Pylox Btl 23,100.00 - 23,100.00
46 Resin Tube 95,000.00 - 95,000.00
47 Residu Ltr 27,600.00 - 27,600.00
48 Rimatex Dempul Tembok/Hommer Kg 29,500.00 - 29,500.00
49 Solar non subsidi / Dexlite Ltr 7,300.00 - 7,300.00
50 Soda api Ltr 27,000.00 - 27,000.00
51 Sealtape bh 10,000.00 - 10,000.00
52 Thinner m³3 Ltr 19,700.00 - 19,700.00
53 Vernis Ltr 93,100.00 - 93,100.00
54 Cat Bata Ltr 120,000.00 - 120,000.00
I KELOMPOK BAHAN SANITAIR
1 Closet Jongkok Merk KIA Type EX RAPI ( 1273A010)/DUTY)/DONI/AS Bh 282,400.00 - 282,400.00
2 Closet Jongkok Merk KIA Type DX RAPI ( 1273A010)/RIMO Bh 250,000.00 - 250,000.00
3 Closet Jongkok Merk Toto Standar Bh 325,000.00 - 325,000.00
4 Closet Jongkok Merk Campion Bh 175,000.00 - 175,000.00
5 Closet Duduk Merk Toto /DONI/LEXUS/RENOVO/A Stdr Bh 2,274,000.00 - 2,274,000.00
6 Closet Duduk Merk Toto Type C Warna Tua/DUTY Bh 1,233,300.00 - 1,233,300.00
7 Wastafel Merk Toto Bh 854,000.00 - 854,000.00
8 Wastafel Merk KIA Type1207 F210/DUTY Bh 870,700.00 - 870,700.00
9 Bak Fiberglass Uk 65 x 65 Bh 270,000.00 - 270,000.00
10 Bak Fiberglass 1 m³ Bh 300,000.00 - 300,000.00
11 Urinoir (Toto) Unit 1,882,500.00 - 1,882,500.00
12 Bathup Unit 3,950,000.00 - 3,950,000.00
13 Bak cuci piring standar + biasa Unit 150,000.00 - 150,000.00
14 Waterdrain Bh 175,000.00 - 175,000.00
15 Sabun kg 15,000.00 - 15,000.00
16 Floordrain (Setara Toto) Bh 103,700.00 - 103,700.00
17 Pelampung Otomatis Bh 130,000.00 - 130,000.00
18 Tangki Air 1000 Liter (Penguin) Bh 1,688,700.00 - 1,688,700.00
19 Tangki Air 500 Liter (Penguin) Bh 1,050,000.00 - 1,050,000.00
20 Mesin Pompa tekan Kap.150 watt Bh 1,175,000.00 - 1,175,000.00
21 Shower Set Bh 184,000.00 - 184,000.00
22 Roof Drain Metal Bh 165,000.00 - 165,000.00
23 Mesin Jet Pump. Kap. 250 watt Bh 1,492,500.00 - 1,492,500.00
24 Kran Dinding (Toto) Bh 116,200.00 - 116,200.00
25 Tempat Sabun (Toto) Set 259,300.00 - 259,300.00
26 Bakteri penguras wc merk Bio 2000 Bh 25,000.00 - 25,000.00
27 Flexible Onda Air Dingin 50 cm Bh 59,500.00 - 59,500.00
28 Flexible Onda Air Panas 50 cm Bh 59,500.00 - 59,500.00
29 Floor Drain Stainless Bh 17,500.00 - 17,500.00

J KELOMPOK BAHAN PIPA


Pipa GIP - Diameter 1/2" M' 28,300.00 - 28,300.00
Pipa GIP - Diameter 3/4" M' 36,500.00 - 36,500.00
Pipa GIP - Diameter 1" M' 39,000.00 - 39,000.00
Pipa GIP - Diameter 1 1/2" M' 55,900.00 - 55,900.00
Pipa PVC AW - Diameter 4 " M' 54,800.00 - 54,800.00
Pipa PVC AW - Diameter 3 " M' 35,200.00 - 35,200.00
Pipa PVC AW - Diameter 2 1/2 " M' 26,400.00 - 26,400.00
Pipa PVC AW - Diameter 2 " M' 19,800.00 - 19,800.00
Pipa PVC AW - Diameter 1 1/2" M' 15,700.00 - 15,700.00
Pipa PVC AW - Diameter 1 " M' 10,300.00 - 10,300.00
Pipa PVC AW - Diameter 3/4 " M' 9,200.00 - 9,200.00
Pipa PVC AW - Diameter 1/2 " M' 7,300.00 - 7,300.00
Pipa PVC AW - Diameter 6 " M' 237,500.00 - 237,500.00
Talang 20cm M' 100,000.00 - 100,000.00
Aksesoris Pipa Talang set 83,125.00 - 83,125.00
J KELOMPOK BAHAN ELEKTRIKAL
Saklar Tunggal Schneider Bh 38,000.00 - 38,000.00
Saklar Ganda Schneider Bh 59,000.00 - 59,000.00
Stop Kontak Schneider Bh 42,000.00 - 42,000.00
Klem Pipa Bh 2,000.00 - 2,000.00
Lampu LG Type1 1 Bh 1,267,000.00 - 1,267,000.00
Fitting Plafond Bh 110,000.00 - 110,000.00
Panel Kelistrikan Gedung bh 40,000,000.00 - 40,000,000.00
MCB 1 set Scheneider bh 70,000.00 - 70,000.00
Lampu Downlight Philips bh 90,000.00 - 90,000.00
Fitting Lampu Otomatis Bh 20,000.00 - 20,000.00
Lampu 20W Bh 85,000.00 - 85,000.00
Kabel NYM m 16,100.00 - 16,100.00
Tdus buah 1,800.00 - 1,800.00
Lbow buah 1,350.00 - 1,350.00
Klem buah 900.00 - 900.00
Pipa Listrik btng 4,000.00 - 4,000.00
Las Dop buah 500.00 - 500.00
LED Strips Philips m' 90,000.00 - 90,000.00
K LAIN-LAIN
Engsel Dekkson Bh 27,500.00 - 27,500.00
Peloran Bh 20,000.00 - 20,000.00
Handle Pintu Panjang Bh 160,000.00 - 160,000.00
Grendel Pintu Dekkson Bh 48,000.00 - 48,000.00
Handle Pintu L Bh 125,000.00 - 125,000.00
Engsel Pintu Putar Bh 190,000.00 - 190,000.00
Engsel Pintu Lipat Bh 37,500.00 - 37,500.00
Rel Pintu Lipat Atas Bawah m 250,000.00 - 250,000.00
Roda Atas Bawah Bh 150,000.00 - 150,000.00
Bracket Gantung Bh 25,000.00 - 25,000.00
Jasa Pembuatan Taman m2 40,000.00 - 40,000.00
Rumput Gajah m2 50,000.00 - 50,000.00
Tanaman Hias Bh 20,000.00 - 20,000.00
Silinder Kunci Bh 30,000.00 - 30,000.00
DAFTAR HARGA SATUAN PERALATAN

PROGRAM : -
KEGIATAN : -
PEKERJAAN : -
LOKASI : -
TAHUN : -

BIAYA SEWA ALAT PER-


NO URAIAN PERALATAN KODE SPESIFIKASI ALAT KETERANGAN
JAM DILUAR PPN (Rp)
PERHITUNGAN VOLUME PEKERJAAN

PROGRAM : -
KEGIATAN : -
PEKERJAAN : -
LOKASI : -
TAHUN : -

NO LINGKUP PEKERJAAN BESERTA GAMBAR SKET URAIAN PERHITUNGAN VOLUME PEKERJAAN

I PEKERJAAN PERSIAPAN
1. Mobilisasi dan Demobilisasi (Tenaga Kerja dan Peralatan)
2. Pemasokan Listrik dan Air Kerja
3. Pengukuran dan Pemasangan Bouwplank
Panjang = 30.60 + 1.50 + 1.50 = 33.60 m
Lebar = 44.70 + 1.50 + 1.50 = 47.70 m
Perhitungan = 33.60 + 47.70 + 33.60 + 47.70 = 162.60 m
4. Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 2 m'
Panjang = 30.60 m
Tinggi = 2.00 m
Luas = 30.60 x 2.00 = 61.20 m2
5. Pembuatan Papan Nama Proyek uk. 100 x 200 cm setinggi 250 cm
6. Pembuatan Kantor Sementara (Direksikeet), lantai plesteran
Ukuran kantor sementara 3.00 x 3.00 m
Luas = 3.00 x 3.00 = 9.00 m2
7. Pembuatan Gudang Semen dan Peralatan
Ukuran gudang 3.00 x 3.00 m
Luas = 3.00 x 3.00 = 9.00 m2
8. Pembersihan Lapangan dan Perataan
Panjang = 30.60 + 1.50 + 1.50 = 33.60 m
Lebar = 44.70 + 1.50 + 1.50 = 47.70 m
Luas = 33.60 x 47.70 = 1,602.72 m2
9. Shop Drawing dan As-built Drawing
10. Site Management (Pelaporan/Dokumentasi proyek)
11. Penyelengaraan SMKK
II PEKERJAAN PONDASI BATU KALI
Gambar Penampang Pondasi Batu Kali: 1. Pek. Galian Tanah Biasa Sedalam 2 m
Luas penampang = 1.50 x 2.00
= 3.00 m2
Volume = 3.00 x 157.70
= 473.10 m3
2. Pek. Urugan Pasir Tbl. 5 cm
Luas penampang = 0.05 x 1.00
= 0.05 m2
Volume = 0.05 x 157.70
= 7.89 m3
3. Pek. Aanstampang / Batu Kosong
Luas penampang = 0.20 x 1.00
= 0.20 m2
Volume = 0.20 x 157.70
= 31.54 m3
Panjang Rencana Pondasi : Jml 4. Pek. Pasangan Batu Kali Spesi 1Pc : 4Ps
Arah Horizontal = 71.50 x 1 = 71.50 m Luas penampang = 1/2 x 0.30 + 0.95 x 0.95
Arah Vertikal = 86.20 x 1 = 86.20 m = 0.59 m2
Panjang total pondasi = 157.70 m Volume = 0.59 x 157.70
= 93.63 m3
5. Urugan Tanah Kembali
Luas penampang = 2.00 x 1/2 x 0.15 + 0.65 x 0.95
= 0.76 m2
Volume = 0.76 x 157.70
= 119.85 m3

III PEKERJAAN STRUKTUR BETON BERTULANG


1. Pek. Pondasi Footplate F1 uk. 3500 x 2200 cm a. Bekisting
Lebar F1 = 2.20 m
Panjang F1 = 3.50 m
Lebar K1 = 0.40 m
Panjang K1 = 0.50 m
Tinggi K1 = 1.55 m
Lebar K2 = 0.40 m
Panjang K2 = 0.40 m
Tinggi K2 = 1.55 m
Jumlah F1 = 18.00 bh
Luas Tutup = 7.70 - 0.20 - 0.16
= 7.34 m2
Luas Kaki = 1.24 + 1.55 + 1.24 + 1.24
= 5.27 m2
Luas bekisting = 7.34 + 5.27 x 18.00
= 226.98 m2
b. Pembesian ---------------> Total volume pembesian = 6,440.75 kg
Lebar F1 = 2.20 m
Panjang F1 = 3.50 m
Lebar K1 = 0.40 m
Panjang K1 = 0.50 m
Tinggi K1 = 1.55 m
Lebar K2 = 0.40 m
Panjang K2 = 0.40 m
Tinggi K2 = 1.55 m
Jumlah F1 = 18.00 bh
Volume Plat
Horizontal = 7.53 x 10.00 = 75.30 m
Vertikal = 4.84 x 17.00 = 82.28 m
Total = 157.58
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
Volume Plat = 4,465.69 kg
Volume Kaki
K1
Tulangan Pokok Atas-Bawah = 8D25 = 8.00 x 2.45 = 10.45 m
= 4D19 = 4.00 x 2.45 = 6.45 m
D25
- Diameter tulangan (Ø) = 25.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 46.13 kg
- Berat besi per-1 m' = 3.84 kg
D19
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
Volume KIB = 8D25 = 10.45 x 3.84 = 40.17 kg
4D19 = 6.45 x 2.22 = 14.32 kg
Sengkang D10
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.040 m
- Jarak spasi tulangan = 0.20 m
- Lebar tulangan sengkang = 0.32 m
- Tinggi tulangan sengkang = 0.42 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.63 m
- Banyak tulangan sengkang = 1.55 / 0.20
= 7.75 bh Pembulatan = 8.00 bh
- Volume tulangan = 8.00 x 1.63 x 0.62
= 8.02 kg
Volume K1 = 875.09 kg
K1B
Tulangan Pokok Atas-Bawah = 12D25 = 12.00 x 2.45 = 14.45 m
D25
- Diameter tulangan (Ø) = 25.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 46.13 kg
- Berat besi per-1 m' = 3.84 kg
Volume KIB = 12D25 = 14.45 x 3.84 = 55.54 kg
Sengkang D10
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.040 m
- Jarak spasi tulangan = 0.20 m
- Lebar tulangan sengkang = 0.32 m
- Tinggi tulangan sengkang = 0.32 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.43 m
- Banyak tulangan sengkang = 1.55 / 0.20
= 7.75 bh Pembulatan = 8.00 bh
- Volume tulangan = 8.00 x 1.43 x 0.62
= 7.04 kg
Volume K1B = 250.31 kg
K2
Tulangan Pokok Atas-Bawah = 8D25 = 8.00 x 2.45 = 10.45 m
D25
- Diameter tulangan (Ø) = 25.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 46.13 kg
- Berat besi per-1 m' = 3.84 kg
Volume KIB = 8D25 = 10.45 x 3.84 = 40.17 kg
Sengkang D10
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.040 m
- Jarak spasi tulangan = 0.20 m
- Lebar tulangan sengkang = 0.32 m
- Tinggi tulangan sengkang = 0.32 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.43 m
- Banyak tulangan sengkang = 1.55 / 0.20
= 7.75 bh Pembulatan = 8.00 bh
- Volume tulangan = 8.00 x 1.43 x 0.62
= 7.04 kg
Volume K2 = 849.65 kg
Volume Kaki = 1,975.06 kg
c. Beton K-350
Plat
Lebar plat = 2.20 m
Tinggi plat = 0.45 m
Panjang plat = 3.50 m
Jumlah plat = 18.00 bh
Volume Beton = 2.20 x 3.50 x 0.45 x 18.00
= 62.37 m3
K1 dan K1B
Lebar K1 = 0.40 m
Tinggi K1 = 0.50 m
Panjang K1 = 1.55 m
Jumlah K1 = 18.00 bh
Volume Beton = 0.40 x 0.50 x 1.55 x 18.00
= 5.58 m3
K2
Lebar K2 = 0.40 m
Tinggi K2 = 0.40 m
Panjang K2 = 1.55 m
Jumlah K2 = 18.00 bh
Volume Beton = 0.40 x 0.40 x 1.55 x 18.00
= 4.46 m3
2. Pek. Pondasi Footplate F2 uk. 4200 x 1100 cm a. Bekisting
Lebar F2 = 1.10 m
Panjang F2 = 4.20 m
Lebar K2 = 0.40 m
Panjang K2 = 0.40 m
Tinggi K2 = 1.55 m
Jumlah F2 = 2.00 bh
Luas Tutup = 4.62 - 0.32
= 4.30 m2
Luas Kaki = 8.00 x 0.40 x 1.55
= 4.96 m2
Luas bekisting = 4.30 + 4.96 x 2.00
= 18.52 m2
b. Pembesian ---------------> Total volume pembesian = 412.53 kg
Lebar F2 = 1.10 m
Panjang F2 = 4.20 m
Lebar K2 = 0.40 m
Panjang K2 = 0.40 m
Tinggi K2 = 1.55 m
Jumlah F2 = 2.00 bh
Volume Plat
Horizontal = 8.87 x 10.00 = 88.70 m
Vertikal = 2.67 x 20.00 = 53.40 m
Total = 142.10
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
Volume Plat = 223.72 kg
Volume Kaki
K2
Tulangan Pokok Atas-Bawah = 8D25 = 8.00 x 2.45 = 10.45 m
D25
- Diameter tulangan (Ø) = 25.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 46.13 kg
- Berat besi per-1 m' = 3.84 kg
Volume KIB = 8D25 = 10.45 x 3.84 = 40.17 kg
Sengkang D10
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.040 m
- Jarak spasi tulangan = 0.20 m
- Lebar tulangan sengkang = 0.32 m
- Tinggi tulangan sengkang = 0.32 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.43 m
- Banyak tulangan sengkang = 1.55 / 0.20
= 7.75 bh Pembulatan = 8.00 bh
- Volume tulangan = 8.00 x 1.43 x 0.62
= 7.04 kg
Volume K2 = 188.81 kg
c. Beton K-350
Plat
Lebar plat = 1.10 m
Tinggi plat = 0.45 m
Panjang plat = 4.20 m
Jumlah plat = 2.00 bh
Volume Beton = 1.10 x 4.20 x 0.45 x 2.00
= 4.16 m3
K2
Lebar K2 = 0.40 m
Tinggi K2 = 0.40 m
Panjang K2 = 1.55 m
Jumlah K2 = 4.00 bh
Volume Beton = 0.40 x 0.40 x 1.55 x 4.00
= 0.99 m3
3. Pek. Pondasi Footplate F3 uk. 3100 x 2000 cm a. Bekisting
Lebar F3 = 2.00 m
Panjang F3 = 3.10 m
Lebar K2 = 0.40 m
Panjang K2 = 0.40 m
Tinggi K2 = 1.55 m
Jumlah F3 = 4.00 bh
Luas Tutup = 6.20 - 0.32
= 5.88 m2
Luas Kaki = 8.00 x 0.40 x 1.55
= 4.96 m2
Luas bekisting = 5.88 + 4.96 x 4.00
= 43.36 m2
b. Pembesian ---------------> Total volume pembesian = 578.69 kg
Lebar F3 = 2.00 m
Panjang F3 = 3.10 m
Lebar K2 = 0.40 m
Panjang K2 = 0.40 m
Tinggi K2 = 1.55 m
Jumlah F3 = 4.00 bh
Volume Plat
Horizontal = 6.74 x 9.00 = 60.66 m
Vertikal = 4.47 x 15.00 = 67.05 m
Total = 127.71
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
Volume Plat = 201.07 kg
Volume Kaki
K2
Tulangan Pokok = 8D25 = 8.00 x 2.45 = 10.45 m
D25
- Diameter tulangan (Ø) = 25.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 46.13 kg
- Berat besi per-1 m' = 3.84 kg
Volume KIB = 8D25 = 10.45 x 3.84 = 40.17 kg
Sengkang D10
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.040 m
- Jarak spasi tulangan = 0.20 m
- Lebar tulangan sengkang = 0.32 m
- Tinggi tulangan sengkang = 0.32 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.43 m
- Banyak tulangan sengkang = 1.55 / 0.20
= 7.75 bh Pembulatan = 8.00 bh
- Volume tulangan = 8.00 x 1.43 x 0.62
= 7.04 kg
Volume K2 = 377.62 kg
c. Beton K-350
Plat
Lebar plat = 2.00 m
Tinggi plat = 0.45 m
Panjang plat = 3.10 m
Jumlah plat = 2.00 bh
Volume Beton = 2.00 x 3.10 x 0.45 x 2.00
= 5.58 m3
K2
Lebar K2 = 0.40 m
Tinggi K2 = 0.40 m
Panjang K2 = 1.55 m
Jumlah K2 = 4.00 bh
Volume Beton = 0.40 x 0.40 x 1.55 x 4.00
= 0.99 m3
4. Pek. Pondasi Footplate F4 uk. 1750 x 1750 cm a. Bekisting
Lebar F4 = 1.75 m
Panjang F4 = 1.75 m
Lebar K2 = 0.40 m
Panjang K2 = 0.40 m
Tinggi K2 = 1.55 m
Jumlah F4 = 2.00 bh
Luas Tutup = 3.06 - 0.16
= 2.90 m2
Luas Kaki = 4.00 x 0.40 x 1.55
= 2.48 m2
Luas bekisting = 2.90 + 2.48 x 2.00
= 10.77 m2
b. Pembesian ---------------> Total volume pembesian = 194.66 kg
Lebar F4 = 1.75 m
Panjang F4 = 1.75 m
Lebar K2 = 0.40 m
Panjang K2 = 0.40 m
Tinggi K2 = 1.55 m
Jumlah F4 = 2.00 bh
Volume Plat
Horizontal = 3.98 x 8.00 = 31.84 m
Vertikal = 3.98 x 8.00 = 31.84 m
Total = 63.68
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
Volume Plat = 100.26 kg
Volume Kaki
K2
Tulangan Pokok = 8D25 = 8.00 x 2.45 = 10.45 m
D25
- Diameter tulangan (Ø) = 25.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 46.13 kg
- Berat besi per-1 m' = 3.84 kg
Volume KIB = 8D25 = 10.45 x 3.84 = 40.17 kg
Sengkang D10
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.040 m
- Jarak spasi tulangan = 0.20 m
- Lebar tulangan sengkang = 0.32 m
- Tinggi tulangan sengkang = 0.32 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.43 m
- Banyak tulangan sengkang = 1.55 / 0.20
= 7.75 bh Pembulatan = 8.00 bh
- Volume tulangan = 8.00 x 1.43 x 0.62
= 7.04 kg
Volume K2 = 94.41 kg
c. Beton K-350
Plat
Lebar plat = 1.75 m
Tinggi plat = 0.45 m
Panjang plat = 1.75 m
Jumlah plat = 2.00 bh
Volume Beton = 1.75 x 1.75 x 0.45 x 2.00
= 2.76 m3
K2
Lebar K2 = 0.40 m
Tinggi K2 = 0.40 m
Panjang K2 = 1.55 m
Jumlah K2 = 2.00 bh
Volume Beton = 0.40 x 0.40 x 1.55 x 2.00
= 0.50 m3
5. Pek. Sloof Uk. 300 x 400 mm a. Bekisting
Bentang L = 28.7 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 28.70 m
Jumlah sloof = 4.00 bh
Luas bekisting = 2.00 x 0.30 x 0.40 x 4.00
= 0.96 m2
Bentang L = 30.6 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 30.60 m
Panjang Rencana Sloof : Jml Jumlah sloof = 3.00 bh
Bentang L = 28.7 m 28.70 x 4 = 114.80 m Luas bekisting = 2.00 x 0.40 x 30.60 x 3.00
Bentang L = 30.6 m 30.60 x 3 = 91.80 m = 73.44 m2
Bentang L = 3.5 m 3.50 x 2 = 7.00 m Bentang L = 3.5 m
Bentang L = 4.08 m 4.08 x 4 = 16.32 m Lebar sloof = 0.30 m
Bentang L = 2.11 m 2.11 x 12 = 25.32 m Tinggi sloof = 0.40 m
Bentang L = 1.92 m 1.92 x 8 = 15.36 m Panjang sloof = 3.50 m
Total = 70.91 m Total panjang sloof = 270.60 m Jumlah sloof = 2.00 bh
Luas bekisting = 2.00 x 0.40 x 3.50 x 2.00
= 5.60 m2
Bentang L = 4.08 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 4.08 m
Jumlah sloof = 4.00 bh
Luas bekisting = 2.00 x 0.40 x 4.08 x 4.00
= 13.06 m2
Bentang L = 2.11 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 2.11 m
Jumlah sloof = 12.00 bh

Luas bekisting = 2.00 x 0.40 x 2.11 x 12.00


= 20.26 m2
Bentang L = 1.92 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 1.92 m
Jumlah sloof = 8.00 bh
Luas bekisting = 2.00 x 0.40 x 1.92 x 8.00
= 12.29 m2
Total Bekisting
= 0.96 + 73.44 + 5.60 + 13.06 + 20.26 + 12.29
= 125.60 m2
b. Pembesian
Bentang L = 28.7 m ---------------> Total volume pembesian = 3,071.86 kg
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 28.70 m
Jumlah sloof = 4.00 bh
a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 28.70 + 0.76
= 30.22 m
- Panjang total tulangan pokok = 8.00 x 30.22
= 241.76 m
- Volume tulangan = 241.76 x 2.22
= 536.74 kg
- Total volume tulangan = 536.74 x 4.00
= 2,146.97 kg
b. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.24 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.31 m
- Banyak tulangan sengkang = 28.70 / 0.10
= 287.00 bh Pembulatan = 287.00 bh
- Volume tulangan = 287.00 x 1.31 x 0.62
= 231.22 kg
- Total volume tulangan = 231.22 x 4.00
= 924.89 kg
Bentang L = 30.6 m ---------------> Total volume pembesian = 2,204.53 kg
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 30.60 m
Jumlah sloof = 3.00 bh
a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 30.60 + 0.76
= 32.12 m
- Panjang total tulangan pokok = 8.00 x 32.12
= 256.96 m
- Volume tulangan = 256.96 x 2.22
= 570.49 kg
- Total volume tulangan = 570.49 x 3.00
= 1,711.47 kg
b. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.15 m
- Lebar tulangan sengkang = 0.24 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.31 m
- Banyak tulangan sengkang = 30.60 / 0.15
= 204.00 bh Pembulatan = 204.00 bh
- Volume tulangan = 204.00 x 1.31 x 0.62
= 164.35 kg
- Total volume tulangan = 164.35 x 3.00
= 493.06 kg
Bentang L = 3.5 m ---------------> Total volume pembesian = 234.72 kg
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 3.50 m
Jumlah sloof = 2.00 bh
a. Tulangan Pokok ( Ø 19mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 3.50 + 0.76
= 5.02 m
- Panjang total tulangan pokok = 8.00 x 5.02
= 40.16 m
- Volume tulangan = 40.16 x 2.22
= 89.16 kg
- Total volume tulangan = 89.16 x 2.00
= 178.32 kg
b. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.24 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.31 m
- Banyak tulangan sengkang = 3.50 / 0.10
= 35.00 bh Pembulatan = 35.00 bh
- Volume tulangan = 35.00 x 1.31 x 0.62
= 28.20 kg
- Total volume tulangan = 28.20 x 2.00
= 56.40 kg
Bentang L = 4.08 m ---------------> Total volume pembesian = 529.98 kg
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 4.08 m
Jumlah sloof = 4.00 bh
a. Tulangan Pokok ( Ø 19mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 4.08 + 0.76
= 5.60 m
- Panjang total tulangan pokok = 8.00 x 5.60
= 44.80 m
- Volume tulangan = 44.80 x 2.22
= 99.46 kg
- Total volume tulangan = 99.46 x 4.00
= 397.85 kg
b. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.24 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.31 m
- Banyak tulangan sengkang = 4.08 / 0.10
= 40.80 bh Pembulatan = 41.00 bh
- Volume tulangan = 41.00 x 1.31 x 0.62
= 33.03 kg
- Total volume tulangan = 33.03 x 4.00
= 132.13 kg
Bentang L = 2.11 m ---------------> Total volume pembesian = 986.37 kg
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 2.11 m
Jumlah sloof = 12.00 bh
a. Tulangan Pokok ( Ø 19mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 2.11 + 0.76
= 3.63 m
- Panjang total tulangan pokok = 8.00 x 3.63
= 29.04 m
- Volume tulangan = 29.04 x 2.22
= 64.47 kg
- Total volume tulangan = 64.47 x 12.00
= 773.68 kg
b. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.24 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.31 m
- Banyak tulangan sengkang = 2.11 / 0.10
= 21.10 bh Pembulatan = 22.00 bh
- Volume tulangan = 22.00 x 1.31 x 0.62
= 17.72 kg
- Total volume tulangan = 17.72 x 12.00
= 212.69 kg
Bentang L = 1.92 m ---------------> Total volume pembesian = 617.69 kg
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 1.92 m
Jumlah sloof = 8.00 bh
a. Tulangan Pokok ( Ø 19mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 1.92 + 0.76
= 3.44 m
- Panjang total tulangan pokok = 8.00 x 3.44
= 27.52 m
- Volume tulangan = 27.52 x 2.22
= 61.10 kg
- Total volume tulangan = 61.10 x 8.00
= 488.79 kg
b. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.24 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.31 m
- Banyak tulangan sengkang = 1.92 / 0.10
= 19.20 bh Pembulatan = 20.00 bh
- Volume tulangan = 20.00 x 1.31 x 0.62
= 16.11 kg
- Total volume tulangan = 16.11 x 8.00
= 128.90 kg
Total Pembesian
= 3,071.86 + 2,204.53 + 234.72 + 529.98 + 986.37 + 617.69
= 7,645.14 Kg
c. Beton K-350
Bentang L = 28.7 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 28.70 m
Jumlah sloof = 4.00 bh
Volume Beton = 0.30 x 0.40 x 28.70 x 4.00
= 13.78 m3
Bentang L = 30.6 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 30.60 m
Jumlah sloof = 3.00 bh
Volume Beton = 0.30 x 0.40 x 30.60 x 3.00
= 11.02 m3
Bentang L = 3.5 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 3.50 m
Jumlah sloof = 2.00 bh
Volume Beton = 0.30 x 0.40 x 3.50 x 2.00
= 0.84 m3
Bentang L = 4.08 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 4.08 m
Jumlah sloof = 4.00 bh
Volume Beton = 0.30 x 0.40 x 4.08 x 4.00
= 1.96 m3
Bentang L = 2.11 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 2.11 m
Jumlah sloof = 12.00 bh
Volume Beton = 0.30 x 0.40 x 2.11 x 12.00
= 3.04 m3
Bentang L = 1.92 m
Lebar sloof = 0.30 m
Tinggi sloof = 0.40 m
Panjang sloof = 1.92 m
Jumlah sloof = 8.00 bh
Volume Beton = 0.30 x 0.40 x 1.92 x 8.00
= 1.84 m3
Total Volume Beton
= 13.78 + 11.02 + 0.84 + 1.96 + 3.04 + 1.84
= 32.47 m3
2. Pek. Kolom Struktur Uk. 400 x 500 mm a. Bekisting Kolom
Tinggi T = 4.60 m
Lebar 01 = 0.40 m
Lebar 02 = 0.50 m
Tinggi kolom = 4.60 m
Jumlah kolom = 18.00 bh
Lebar bekisting = 2.00 x 0.40 + 2.00 x 0.50
= 1.80 m
Luas bekisting = 1.80 x 4.60 x 18.00
= 149.04 m2
b. Pembesian
Tinggi T = 4.60 m ---------------> Total volume pembesian = 5,461.42 kg
Rencana Kolom Struktur : Lebar 01 = 0.40 m
Lebar 02 = 0.50 m
Jml Tinggi kolom = 4.60 m
Tinggi T = 4.60 m 4.60 x 18 = 82.80 m Jumlah kolom = 18.00 bh
a. Tulangan Pokok-Utama ( Ø 25 mm )
- Diameter tulangan (Ø) = 25.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 46.13 kg
- Berat besi per-1 m' = 3.84 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 1.00 m
- Panjang 1 bh tulangan pokok = 1.00 + 4.60 + 1.00
= 6.60 m
- Panjang total tulangan pokok = 8.00 x 6.60
= 52.80 m
- Volume tulangan = 52.80 x 3.84
= 202.95 kg
- Total volume tulangan = 202.95 x 18.00
= 3,653.10 kg
b. Tulangan Pokok-Tengah ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 4.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 4.60 + 0.76
= 6.12 m
- Panjang total tulangan pokok = 4.00 x 6.12
= 24.48 m
- Volume tulangan = 24.48 x 2.22
= 54.35 kg
- Total volume tulangan = 54.35 x 18.00
= 978.29 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.040 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.32 m
- Tinggi tulangan sengkang = 0.42 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.63 m
- Banyak tulangan sengkang = 4.60 / 0.10
= 46.00 bh Pembulatan = 46.00 bh
- Volume tulangan = 46.00 x 1.63 x 0.62
= 46.11 kg
- Total volume tulangan = 46.11 x 18.00
= 830.03 kg
Total Pembesian
= 3,653.10 + 978.29 + 830.03
= 5,461.42 Kg
c. Beton K-350
Tinggi T = 4.60 m
Lebar 01 = 0.40 m
Lebar 02 = 0.50 m
Tinggi kolom = 4.60 m
Jumlah kolom = 18.00 bh
Volume Beton = 0.40 x 0.50 x 4.60 x 18.00
= 16.56 m3
Total Volume Beton
= 16.56
= 16.56 m3
3. Pek. Kolom Struktur Uk. 400 x 400 mm a. Bekisting Kolom
Tinggi T = 2.7 m
Lebar 01 = 0.40 m
Lebar 02 = 0.40 m
Tinggi kolom = 2.70 m
Jumlah kolom = 31.00 bh
Lebar bekisting = 2.00 x 0.40 + 2.00 x 0.40
= 1.60 m
Luas bekisting = 1.60 x 2.70 x 31.00
= 133.92 m2
Tinggi T = 3.75 m
Lebar 01 = 0.40 m
Rencana Kolom Struktur : Lebar 02 = 0.40 m
Tinggi kolom = 3.75 m
Jml Jumlah kolom = 6.00 bh
Tinggi T = 2.7 m 2.70 x 31 = 83.70 m Lebar bekisting = 2.00 x 0.40 + 2.00 x 0.40
Tinggi T = 3.75 m 3.75 x 6 = 22.50 m = 1.60 m
Luas bekisting = 1.60 x 3.75 x 6.00
= 36.00 m2
b. Pembesian
Tinggi T = 2.7 m ---------------> Total volume pembesian = 5,216.37 kg
Lebar 01 = 0.40 m
Lebar 02 = 0.40 m
Tinggi kolom = 2.70 m
Jumlah kolom = 31.00 bh
a. Tulangan Pokok ( Ø 25 mm )
- Diameter tulangan (Ø) = 25.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 46.13 kg
- Berat besi per-1 m' = 3.84 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 1.00 m
- Panjang 1 bh tulangan pokok = 1.00 + 2.70 + 1.00
= 4.70 m
- Panjang total tulangan pokok = 8.00 x 4.70
= 37.60 m
- Volume tulangan = 37.60 x 3.84
= 144.53 kg
- Total volume tulangan = 144.53 x 31.00
= 4,480.28 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.040 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.32 m
- Tinggi tulangan sengkang = 0.32 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.43 m
- Banyak tulangan sengkang = 2.70 / 0.10
= 27.00 bh Pembulatan = 27.00 bh
- Volume tulangan = 27.00 x 1.43 x 0.62
= 23.75 kg
- Total volume tulangan = 23.75 x 31.00
= 736.10 kg
Tinggi T = 3.75 m ---------------> Total volume pembesian = 762.12 kg
Lebar 01 = 0.40 m
Lebar 02 = 0.40 m
Tinggi kolom = 3.75 m
Jumlah kolom = 6.00 bh
a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 3.75 + 0.76
= 5.27 m
- Panjang total tulangan pokok = 8.00 x 5.27
= 42.16 m
- Volume tulangan = 42.16 x 2.22
= 93.60 kg
- Total volume tulangan = 93.60 x 6.00
= 561.61 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.040 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.32 m
- Tinggi tulangan sengkang = 0.32 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.43 m
- Banyak tulangan sengkang = 3.75 / 0.10
= 37.50 bh Pembulatan = 38.00 bh
- Volume tulangan = 38.00 x 1.43 x 0.62
= 33.42 kg
- Total volume tulangan = 33.42 x 6.00
= 200.51 kg
Total Pembesian
= 5,216.37 + 762.12
= 5,978.50 Kg
c. Beton K-350
Tinggi T = 2.7 m
Lebar 01 = 0.40 m
Lebar 02 = 0.40 m
Tinggi kolom = 2.70 m
Jumlah kolom = 31.00 bh
Volume Beton = 0.40 x 0.40 x 2.70 x 31.00
= 13.39 m3
Tinggi T = 3.75 m
Lebar 01 = 0.40 m
Lebar 02 = 0.40 m
Tinggi kolom = 3.75 m
Jumlah kolom = 6.00 bh
Volume Beton = 0.40 x 0.40 x 3.75 x 6.00
= 3.60 m3
Total Volume Beton
= 13.39 + 3.60
= 16.99 m3
4. Pek. Kolom Praktis Uk. 150 x 150 mm a. Bekisting Kolom
Tinggi T = 4.35 m
Lebar 01 = 0.15 m
Lebar 02 = 0.15 m
Tinggi kolom = 4.35 m
Jumlah kolom = 15.00 bh
Lebar bekisting = 2.00 x 0.15
= 0.30 m
Luas bekisting = 0.30 x 4.35 x 15.00
= 19.58 m2
Rencana Kolom Praktis : b. Pembesian
Tinggi T = 4.35 m ---------------> Total volume pembesian = 343.30 kg
Jml Lebar 01 = 0.15 m
Tinggi T = 4.35 m 4.35 x 15 = 65.25 m Lebar 02 = 0.15 m
Tinggi kolom = 4.35 m
Jumlah kolom = 15.00 bh
a. Tulangan Pokok ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Jumlah tulangan pokok = 4.00 bh
- Overlap untuk sambungan (40d) = 0.40 m
- Panjang 1 bh tulangan pokok = 0.40 + 4.35 + 0.40
= 5.15 m
- Panjang total tulangan pokok = 4.00 x 5.15
= 20.60 m
- Volume tulangan = 20.60 x 0.62
= 12.67 kg
- Total volume tulangan = 12.67 x 15.00
= 190.04 kg
b. Tulangan Sengkang/begol ( Ø 8 mm )
- Diameter tulangan (Ø) = 8.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 4.72 kg
- Berat besi per-1 m' = 0.39 kg
- Selimut beton = 0.020 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.11 m
- Tinggi tulangan sengkang = 0.11 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 0.59 m
- Banyak tulangan sengkang = 4.35 / 0.10
= 43.50 bh Pembulatan = 44.00 bh
- Volume tulangan = 44.00 x 0.59 x 0.39
= 10.22 kg
- Total volume tulangan = 10.22 x 15.00
= 153.27 kg
Total Pembesian
= 190.04 + 153.27
= 343.30 Kg
c. Beton K-350
Tinggi T = 4.35 m
Lebar 01 = 0.15 m
Lebar 02 = 0.15 m
Tinggi kolom = 4.35 m
Jumlah kolom = 15.00 bh
Volume Beton = 0.15 x 0.15 x 4.35 x 15.00
= 1.47 m3
Total Volume Beton
= 1.47
= 1.47 m3
5. Pek. Ring Balk Uk. B1 300 x 500 mm a. Bekisting Balok
Bentang L = 2.10 m
Lebar balok = 0.30 m
Tinggi balok = 0.50 m
Panjang balok = 2.10 m
Jumlah balok = 18.00 bh
Lebar bekisting = 2.00 x 0.30 + 2.00 x 0.50
= 1.60 m
Luas bekisting = 1.60 x 2.10 x 18.00
= 60.48 m2
b. Pembesian
Bentang L = 2.10 m ---------------> Total volume pembesian = 1,634.85 kg
Lebar balok = 0.30 m
Panjang Rencana Balok B1 : Tinggi balok = 0.50 m
Panjang balok = 2.10 m
Jml Jumlah balok = 18.00 bh
Bentang L = 2.10 m 2.10 x 18 = 37.80 m a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 2.10 + 0.76
= 3.62 m
- Panjang total tulangan pokok = 8.00 x 3.62
= 28.96 m
- Volume tulangan = 28.96 x 2.22
= 64.30 kg
- Total volume tulangan = 64.30 x 18.00
= 1,157.32 kg
b. Tulangan Bagi ( Ø 16 mm )
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
- Jumlah tulangan bagi = 4.00 bh
- Overlap untuk sambungan (40d) = 0.64 m
- Panjang 1 bh tulangan pokok = 0.64 + 0.00 + 0.64
= 1.28 m
- Panjang total tulangan pokok = 4.00 x 1.28
= 5.12 m
- Volume tulangan = 5.12 x 1.57
= 8.06 kg
- Total volume tulangan = 8.06 x 18.00
= 145.10 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.040 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.22 m
- Tinggi tulangan sengkang = 0.42 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.43 m
- Banyak tulangan sengkang = 2.10 / 0.10
= 21.00 bh Pembulatan = 21.00 bh
- Volume tulangan = 21.00 x 1.43 x 0.62
= 18.47 kg
- Total volume tulangan = 18.47 x 18.00
= 332.43 kg
Total Pembesian
= 1,157.32 + 145.10 + 332.43
= 1,634.85 Kg
c. Beton K-350
Bentang L = 2.10 m
Lebar balok = 0.30 m
Tinggi balok = 0.50 m
Panjang balok = 2.10 m
Jumlah balok = 18.00 bh
Volume Beton = 0.30 x 0.50 x 2.10 x 18.00
= 5.67 m3
Total Volume Beton
= 5.67 + +
= 5.67 m3
6. Pek. Ring Balk Uk. B2 250 x 500 mm a. Bekisting Balok
Bentang L = 26.4 m
Lebar B2 = 0.25 m
Tinggi B2 = 0.50 m
Panjang B2 = 26.40 m
Jumlah B2 = 1.00 bh
Lebar bekisting B2 = 2.00 x 0.25 + 2.00 x 0.50
= 1.50 m
Luas bekisting B2 = 1.50 x 26.40 x 1.00
= 39.60 m2
Total bekisting = 39.60 +
= 39.60 m2
b. Pembesian
Bentang L = 26.4 m ---------------> Total volume pembesian = 728.85 kg
Panjang Rencana Ring Balok : Lebar B2 = 0.25 m
Tinggi B2 = 0.50 m
Jml Panjang B2 = 26.40 m
Bentang L = 26.4 m 26.40 x 1 = 26.40 m Jumlah B2 = 1.00 bh
Total panjang ring balok = 26.40 m a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 8.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 26.40 + 0.76
= 27.92 m
- Panjang total tulangan pokok = 8.00 x 27.92
= 223.36 m
- Volume tulangan = 223.36 x 2.22
= 495.89 kg
- Total volume tulangan = 495.89 x 1.00
= 495.89 kg
b. Tulangan Bagi ( Ø 16 mm )
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
- Jumlah tulangan bagi = 2.00 bh
- Overlap untuk sambungan (40d) = 0.64 m
- Panjang 1 bh tulangan pokok = 0.64 + 0.00 + 0.64
= 1.28 m
- Panjang total tulangan pokok = 2.00 x 1.28
= 2.56 m
- Volume tulangan = 2.56 x 1.57
= 4.03 kg
- Total volume tulangan = 4.03 x 1.00
= 4.03 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.19 m
- Tinggi tulangan sengkang = 0.44 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.41 m
- Banyak tulangan sengkang = 26.40 / 0.10
= 264.00 bh Pembulatan = 264.00 bh
- Volume tulangan = 264.00 x 1.41 x 0.62
= 228.93 kg
- Total volume tulangan = 228.93 x 1.00
= 228.93 kg
Total Pembesian
= 495.89 + 4.03 + 228.93
= 728.85 Kg
c. Beton K-350
Bentang L = 26.4 m
Lebar B2 = 0.25 m
Tinggi B2 = 0.50 m
Panjang B2 = 26.40 m
Jumlah B2 = 1.00 bh
Volume Beton = 0.25 x 0.50 x 26.40 x 1.00
= 3.30 m3
Total Volume Beton
= 3.30 + +
= 3.30 m3
7. Pek. Ring Balk Uk. B3 250 x 400 mm a. Bekisting Balok
Bentang L = 28.7 m
Lebar B3 = 0.25 m
Tinggi B3 = 0.40 m
Panjang B3 = 28.70 m
Jumlah B3 = 2.00 bh
Lebar bekisting B3 = 2.00 x 0.25 + 2.00 x 0.40
= 1.30 m
Luas bekisting B3 = 1.30 x 28.70 x 2.00
= 74.62 m2
Total bekisting = 74.62 +
= 74.62 m2
Bentang L = 1.92 m
Lebar B3 = 0.25 m
Panjang Rencana Ring Balok B3: Tinggi B3 = 0.40 m
Panjang B3 = 1.92 m
Jml Jumlah B3 = 6.00 bh
Bentang L = 28.7 m 28.70 x 2 = 57.40 m Lebar bekisting B3 = 2.00 x 0.25 + 2.00 x 0.40
Bentang L = 1.92 m 1.92 x 6 = 11.52 m = 1.30 m
Bentang L = 26.4 m 26.40 x 1 = 26.40 m Luas bekisting B3 = 1.30 x 1.92 x 6.00
Total panjang ring balok = 95.32 m = 14.98 m2
Total bekisting = 14.98 +
= 14.98 m2
Bentang L = 26.4 m
Lebar B3 = 0.25 m
Tinggi B3 = 0.40 m
Panjang B3 = 26.40 m
Jumlah B3 = 1.00 bh
Lebar bekisting B3 = 2.00 x 0.25 + 2.00 x 0.40
= 1.30 m
Luas bekisting B3 = 1.30 x 26.40 x 1.00
= 34.32 m2
Total bekisting = 74.62 + 14.98 + 34.32
= 123.92 m2
b. Pembesian
Bentang L = 28.7 m ---------------> Total volume pembesian = 1,240.32 kg
Lebar B3 = 0.25 m
Tinggi B3 = 0.40 m
Panjang B3 = 28.70 m
Jumlah B3 = 2.00 bh
a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 6.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 28.70 + 0.76
= 30.22 m
- Panjang total tulangan pokok = 6.00 x 30.22
= 181.32 m
- Volume tulangan = 181.32 x 2.22
= 402.56 kg
- Total volume tulangan = 402.56 x 2.00
= 805.12 kg
b. Tulangan Bagi ( Ø 16 mm )
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
- Jumlah tulangan bagi = 2.00 bh
- Overlap untuk sambungan (40d) = 0.64 m
- Panjang 1 bh tulangan pokok = 0.64 + 0.00 + 0.64
= 1.28 m
- Panjang total tulangan pokok = 2.00 x 1.28
= 2.56 m
- Volume tulangan = 2.56 x 1.57
= 4.03 kg
- Total volume tulangan = 4.03 x 2.00
= 8.06 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.19 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.21 m
- Banyak tulangan sengkang = 28.70 / 0.10
= 287.00 bh Pembulatan = 287.00 bh
- Volume tulangan = 287.00 x 1.21 x 0.62
= 213.57 kg
- Total volume tulangan = 213.57 x 2.00
= 427.14 kg
Bentang L = 1.92 m ---------------> Total volume pembesian = 388.42 kg
Lebar B3 = 0.25 m
Tinggi B3 = 0.40 m
Panjang B3 = 1.92 m
Jumlah B3 = 6.00 bh
a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 6.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 1.92 + 0.76
= 3.44 m
- Panjang total tulangan pokok = 6.00 x 3.44
= 20.64 m
- Volume tulangan = 20.64 x 2.22
= 45.82 kg
- Total volume tulangan = 45.82 x 6.00
= 274.94 kg
b. Tulangan Bagi ( Ø 16 mm )
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
- Jumlah tulangan bagi = 2.00 bh
- Overlap untuk sambungan (40d) = 0.64 m
- Panjang 1 bh tulangan pokok = 0.64 + 0.00 + 0.64
= 1.28 m
- Panjang total tulangan pokok = 2.00 x 1.28
= 2.56 m
- Volume tulangan = 2.56 x 1.57
= 4.03 kg
- Total volume tulangan = 4.03 x 6.00
= 24.18 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.19 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.21 m
- Banyak tulangan sengkang = 1.92 / 0.10
= 19.20 bh Pembulatan = 20.00 bh
- Volume tulangan = 20.00 x 1.21 x 0.62
= 14.88 kg
- Total volume tulangan = 14.88 x 6.00
= 89.30 kg
Bentang L = 26.4 m ---------------> Total volume pembesian = 572.41 kg
Lebar B3 = 0.25 m
Tinggi B3 = 0.40 m
Panjang B3 = 26.40 m
Jumlah B3 = 1.00 bh
a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 6.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 26.40 + 0.76
= 27.92 m
- Panjang total tulangan pokok = 6.00 x 27.92
= 167.52 m
- Volume tulangan = 167.52 x 2.22
= 371.92 kg
- Total volume tulangan = 371.92 x 1.00
= 371.92 kg
b. Tulangan Bagi ( Ø 16 mm )
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
- Jumlah tulangan bagi = 2.00 bh
- Overlap untuk sambungan (40d) = 0.64 m
- Panjang 1 bh tulangan pokok = 0.64 + 0.00 + 0.64
= 1.28 m
- Panjang total tulangan pokok = 2.00 x 1.28
= 2.56 m
- Volume tulangan = 2.56 x 1.57
= 4.03 kg
- Total volume tulangan = 4.03 x 1.00
= 4.03 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.19 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.21 m
- Banyak tulangan sengkang = 26.40 / 0.10
= 264.00 bh Pembulatan = 264.00 bh
- Volume tulangan = 264.00 x 1.21 x 0.62
= 196.46 kg
- Total volume tulangan = 196.46 x 1.00
= 196.46 kg
Total Pembesian
= 1,240.32 + 388.42 + 572.41
= 2,201.15 Kg
c. Beton K-350
Bentang L = 28.7 m
Lebar B3 = 0.25 m
Tinggi B3 = 0.40 m
Panjang B3 = 28.70 m
Jumlah B3 = 2.00 bh
Volume Beton = 0.25 x 0.40 x 28.70 x 2.00
= 5.74 m3
Bentang L = 1.92 m
Lebar B3 = 0.25 m
Tinggi B3 = 0.40 m
Panjang B3 = 1.92 m
Jumlah B3 = 6.00 bh
Volume Beton = 0.25 x 0.40 x 1.92 x 6.00
= 1.15 m3
Bentang L = 26.4 m
Lebar B3 = 0.25 m
Tinggi B3 = 0.40 m
Panjang B3 = 26.40 m
Jumlah B3 = 1.00 bh
Volume Beton = 0.25 x 0.40 x 26.40 x 1.00
= 2.64 m3
Total Volume Beton
= 5.74 + 1.15 + 2.64
= 9.53 m3
7. Pek. Ring Balk Uk. B4 200 x 400 mm a. Bekisting Balok
Bentang L = 28.7 m
Lebar B4 = 0.20 m
Tinggi B4 = 0.40 m
Panjang B4 = 28.70 m
Jumlah B4 = 2.00 bh
Lebar bekisting B4 = 2.00 x 0.20 + 2.00 x 0.40
= 1.20 m
Luas bekisting B4 = 1.20 x 28.70 x 2.00
= 68.88 m2
Total bekisting = 68.88 +
= 68.88 m2
Bentang L = 10.42 m
Lebar B4 = 0.20 m
Panjang Rencana Ring Balok B4: Tinggi B4 = 0.40 m
Panjang B4 = 10.40 m
Jml Jumlah B4 = 4.00 bh
Bentang L = 28.7 m 28.70 x 2 = 57.40 m Lebar bekisting B4 = 2.00 x 0.20 + 2.00 x 0.40
Bentang L = 10.42 m 10.40 x 4 = 41.60 m = 1.20 m
Bentang L = 4.09 m 4.09 x 4 = 16.36 m Luas bekisting B4 = 1.20 x 10.40 x 4.00
Total panjang ring balok = 115.36 m = 49.92 m2
Total bekisting = 49.92 +
= 49.92 m2
Bentang L = 4.09 m
Lebar B4 = 0.20 m
Tinggi B4 = 0.40 m
Panjang B4 = 4.09 m
Jumlah B4 = 4.00 bh
Lebar bekisting B4 = 2.00 x 0.20 + 2.00 x 0.40
= 1.20 m
Luas bekisting B4 = 1.20 x 4.09 x 4.00
= 19.63 m2
Total bekisting = 68.88 + 49.92 + 19.63
= 138.43 m2
b. Pembesian
Bentang L = 28.7 m ---------------> Total volume pembesian = 1,205.02 kg
Lebar B4 = 0.20 m
Tinggi B4 = 0.40 m
Panjang B4 = 28.70 m
Jumlah B4 = 2.00 bh
a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 6.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 28.70 + 0.76
= 30.22 m
- Panjang total tulangan pokok = 6.00 x 30.22
= 181.32 m
- Volume tulangan = 181.32 x 2.22
= 402.56 kg
- Total volume tulangan = 402.56 x 2.00
= 805.12 kg
b. Tulangan Bagi ( Ø 16 mm )
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
- Jumlah tulangan bagi = 2.00 bh
- Overlap untuk sambungan (40d) = 0.64 m
- Panjang 1 bh tulangan pokok = 0.64 + 0.00 + 0.64
= 1.28 m
- Panjang total tulangan pokok = 2.00 x 1.28
= 2.56 m
- Volume tulangan = 2.56 x 1.57
= 4.03 kg
- Total volume tulangan = 4.03 x 2.00
= 8.06 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.14 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.11 m
- Banyak tulangan sengkang = 28.70 / 0.10
= 287.00 bh Pembulatan = 287.00 bh
- Volume tulangan = 287.00 x 1.11 x 0.62
= 195.92 kg
- Total volume tulangan = 195.92 x 2.00
= 391.84 kg
Bentang L = 10.42 m ---------------> Total volume pembesian = 935.24 kg
Lebar B4 = 0.20 m
Tinggi B4 = 0.40 m
Panjang B4 = 10.40 m
Jumlah B4 = 4.00 bh
a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 6.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 10.40 + 0.76
= 11.92 m
- Panjang total tulangan pokok = 6.00 x 11.92
= 71.52 m
- Volume tulangan = 71.52 x 2.22
= 158.79 kg
- Total volume tulangan = 158.79 x 4.00
= 635.14 kg
b. Tulangan Bagi ( Ø 16 mm )
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
- Jumlah tulangan bagi = 2.00 bh
- Overlap untuk sambungan (40d) = 0.64 m
- Panjang 1 bh tulangan pokok = 0.64 + 0.00 + 0.64
= 1.28 m
- Panjang total tulangan pokok = 2.00 x 1.28
= 2.56 m
- Volume tulangan = 2.56 x 1.57
= 4.03 kg
- Total volume tulangan = 4.03 x 4.00
= 16.12 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.14 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.11 m
- Banyak tulangan sengkang = 10.40 / 0.10
= 104.00 bh Pembulatan = 104.00 bh
- Volume tulangan = 104.00 x 1.11 x 0.62
= 71.00 kg
- Total volume tulangan = 71.00 x 4.00
= 283.98 kg
Bentang L = 4.09 m ---------------> Total volume pembesian = 427.00 kg
Lebar B4 = 0.20 m
Tinggi B4 = 0.40 m
Panjang B4 = 4.09 m
Jumlah B4 = 4.00 bh
a. Tulangan Pokok ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 6.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 4.09 + 0.76
= 5.61 m
- Panjang total tulangan pokok = 6.00 x 5.61
= 33.66 m
- Volume tulangan = 33.66 x 2.22
= 74.73 kg
- Total volume tulangan = 74.73 x 4.00
= 298.92 kg
b. Tulangan Bagi ( Ø 16 mm )
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
- Jumlah tulangan bagi = 2.00 bh
- Overlap untuk sambungan (40d) = 0.64 m
- Panjang 1 bh tulangan pokok = 0.64 + 0.00 + 0.64
= 1.28 m
- Panjang total tulangan pokok = 2.00 x 1.28
= 2.56 m
- Volume tulangan = 2.56 x 1.57
= 4.03 kg
- Total volume tulangan = 4.03 x 4.00
= 16.12 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.14 m
- Tinggi tulangan sengkang = 0.34 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 1.11 m
- Banyak tulangan sengkang = 4.09 / 0.10
= 40.90 bh Pembulatan = 41.00 bh
- Volume tulangan = 41.00 x 1.11 x 0.62
= 27.99 kg
- Total volume tulangan = 27.99 x 4.00
= 111.95 kg
Total Pembesian
= 1,205.02 + 935.24 + 427.00
= 2,567.26 Kg
c. Beton K-350
Bentang L = 28.7 m
Lebar B4 = 0.20 m
Tinggi B4 = 0.40 m
Panjang B4 = 28.70 m
Jumlah B4 = 2.00 bh
Volume Beton = 0.20 x 0.40 x 28.70 x 2.00
= 4.59 m3
Bentang L = 10.42 m
Lebar B4 = 0.20 m
Tinggi B4 = 0.40 m
Panjang B4 = 10.40 m
Jumlah B4 = 4.00 bh
Volume Beton = 0.20 x 0.40 x 10.40 x 4.00
= 3.33 m3
Bentang L = 4.09 m
Lebar B4 = 0.20 m
Tinggi B4 = 0.40 m
Panjang B4 = 4.09 m
Jumlah B4 = 4.00 bh
Volume Beton = 0.20 x 0.40 x 4.09 x 4.00
= 1.31 m3
Total Volume Beton
= 4.59 + 3.33 + 1.31
= 9.23 m3
IV PEKERJAAN PEMASANGAN DINDING DAN FINISHING
1. Pek. Pasangan Dinding Bata 1. Pek. Pasangan Dinding Bata Tebal 1/2 Batu Spesi 1Pc : 4Ps
Luas Bruto Pas. Dinding Bata
Tinggi dinding - 01 = 3.20 m
Panjang dinding - 01 = 70.91 x 1.00 = 70.91 m
Luas dinding - 01 = 3.20 x 70.91 = 226.91 m2
Tinggi dinding - 02 = 4.35 m
Panjang dinding - 02 = 16.00 x 1.00 = 16.00 m
Luas dinding - 02 = 4.35 x 16.00 = 69.60 m2
Jumlah = 226.91 + 69.60 = 296.51 m2
Luas Pas. Kusen
kusen Pintu P1-P5 = 0.44 x 1.00 x 1.00 = 0.44 m2
kusen Jendela J1-BV1 = 1.13 x 1.00 x 1.00 = 1.13 m2 +
Jumlah = 1.58 m2
Luas Netto / Bersih Pas. Dinding Bata
= 296.51 - 1.58 = 294.94 m2
2. Pek. Plesteran Spesi 1Pc : 4Ps, Tebal 20 mm
Luas Plesteran = 2.00 x Luas pasangan dinding bata
= 2.00 x 294.94
= 589.87 m2
3. Pek. Acian
Luas Acian = Luas Plesteran
= 589.87 m2
4. Pek. Pasangan Dinding Rooster uk. 20 x 20 Cm Luas Dinding = p x t x jumlah + p x t x jumlah
= 0.80 x 2.20 x 10.00 + 3.10 x 2.20 x 2.00
= 31.24 m2
5. Pek. Pasangan Dinding Bata Expose Luas Dinding = p x t x jumlah + p x t x jumlah
= 4.20 x 6.70 x 2.00 + 4.80 x 4.70 x 1.00
= 78.84 m2
6. Pek. Pasangan Dinding Batu Telur Luas Dinding = p x t x 4.00 x jumlah
= 0.15 x 2.15 x 4.00 x 26.00
= 33.54 m2
V PEKERJAAN KUSEN, PINTU, JENDELA DAN VENTILASI
1. Pek. kusen Pintu, Jendela dan Ventilasi
Pintu P1
Jumlah unit = 3.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 1.10 + 1.10 + + = 2.20 m
Arah vertikal = 2.20 + 0.18 + + = 2.38 m
Total = 2.20 + 2.38 = 4.58 m
Volume - a = 3.00 x 0.06 x 0.10 x 4.58 = 0.08 m3
Pintu P2
Jumlah unit = 2.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 1.10 + 1.10 + 1.10 + = 3.30 m
Arah vertikal = 2.25 + 0.26 + + = 2.51 m
Total = 3.30 + 2.51 = 5.81 m
Volume - b = 2.00 x 0.06 x 0.10 x 5.81 = 0.07 m3
Pintu P3
Jumlah unit = 1.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 2.10 + + + = 2.10 m
Arah vertikal = 2.10 + 0.40 + + = 2.50 m
Total = 2.10 + 2.50 = 4.60 m
Volume - c = 1.00 x 0.06 x 0.10 x 4.60 = 0.03 m3
Pintu P4
Jumlah unit = 11.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 0.80 + + + = 0.80 m
Arah vertikal = 2.20 + + + = 2.20 m
Total = 0.80 + 2.20 = 3.00 m
Volume - d = 11.00 x 0.06 x 0.10 x 3.00 = 0.20 m3
Pintu P5
Jumlah unit = 2.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 3.35 + + + = 3.35 m
Arah vertikal = 2.24 + 0.01 + + = 2.25 m
Total = 3.35 + 2.25 = 5.60 m
Volume - e = 2.00 x 0.06 x 0.10 x 5.60 = 0.07 m3
Jendela J1
Jumlah unit = 2.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 2.97 + + + = 2.97 m
Arah vertikal = 2.23 + + + = 2.23 m
Total = 2.97 + 2.23 = 5.20 m
Volume - f = 2.00 x 0.06 x 0.10 x 5.20 = 0.06 m3
Jendela J2
Jumlah unit = 2.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 1.10 + + + = 1.10 m
Arah vertikal = 1.50 + + + = 1.50 m
Total = 1.10 + 1.50 = 2.60 m
Volume - g = 2.00 x 0.06 x 0.10 x 2.60 = 0.03 m3
Jendela J3
Jumlah unit = 1.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 3.48 + + + = 3.48 m
Arah vertikal = 1.68 + + + = 1.68 m
Total = 3.48 + 1.68 = 5.16 m
Volume - h = 1.00 x 0.06 x 0.10 x 5.16 = 0.03 m3
Pintu Jendela PJ1
Jumlah unit = 1.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 3.12 + + + = 3.12 m
Arah vertikal = 2.35 + + + = 2.35 m
Total = 3.12 + 2.35 = 5.47 m
Volume - i = 1.00 x 0.06 x 0.10 x 5.47 = 0.03 m3
Pintu Jendela PJ2
Jumlah unit = 1.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 3.12 + + + = 3.12 m
Arah vertikal = 2.35 + + + = 2.35 m
Total = 3.12 + 2.35 = 5.47 m
Volume - i = 1.00 x 0.06 x 0.10 x 5.47 = 0.03 m3
Pintu Lipat PL1
Jumlah unit = 3.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 5.76 + + + = 5.76 m
Arah vertikal = 3.17 + + + = 3.17 m
Total = 5.76 + 3.17 = 8.93 m
Volume - j = 3.00 x 0.06 x 0.10 x 8.93 = 0.16 m3
Pintu Lipat PL2
Jumlah unit = 2.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 2.84 + + + = 2.84 m
Arah vertikal = 3.17 + + + = 3.17 m
Total = 2.84 + 3.17 = 6.01 m
Volume - k = 2.00 x 0.06 x 0.10 x 6.01 = 0.07 m3
Ventilasi Boven B1
Jumlah unit = 2.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 3.33 + + + = 3.33 m
Arah vertikal = 0.60 + + + = 0.60 m
Total = 3.33 + 0.60 = 3.93 m
Volume - l = 2.00 x 0.06 x 0.10 x 3.93 = 0.05 m3
Ventilasi Boven B2
Jumlah unit = 2.00 unit
Dimensi kayu kusen = 0.06 m
= 0.10 m
Panjang kayu kusen
Arah horizontal = 4.57 + + + = 4.57 m
Arah vertikal = 0.66 + + + = 0.66 m
Total = 4.57 + 0.66 = 5.23 m
Volume - l = 2.00 x 0.06 x 0.10 x 5.23 = 0.06 m3
Volume = 0.44 + 0.12 + 0.30 + 0.71
= 1.58 m3
VI PEKERJAAN ATAP
1. Pek. Kuda kuda atap a. Kuda kuda IWF 500x200x10x16
Lebar portal = 26.35 m
Tinggi = 10.30 m
Sudut = 38.018 o
Panjang rafter = 16.7234 m

Kuda kuda utuh = 5.00unit


panjang = 33.45 m
total = 167.23 m
Tambahan IWF = 1.00unit
panjang = 18.34 m
total = 18.34 m
Kuda kuda tengah = 1.00unit
panjang = 22.44 m
total = 22.44 m
Kuda kuda sisi miri = 2.00unit
panjang = 2.50 m
total = 5.00 m
Kuda kuda depan = 2.00unit
panjang = 5.97 m
total = 11.94 m
Volume total = 224.95 m
= 20,151.40 kg
b. Kuda kuda Balok BR3 250x400
Bentang 13.21
Bekisting
Lebar BR3 = 0.35 m
Tinggi BR3 = 0.40 m
Panjang BR3 = 13.22 m
Jumlah BR3 = 4.00 bh
Luas bekisting = 2.00 x 0.35 x 0.40 x 4.00
= 1.12 m2
Pembesian
a. Tulangan Pokok Atas-Bawah ( Ø 19 mm )
- Diameter tulangan (Ø) = 19.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 26.64 kg
- Berat besi per-1 m' = 2.22 kg
- Jumlah tulangan pokok = 6.00 bh
- Overlap untuk sambungan (40d) = 0.76 m
- Panjang 1 bh tulangan pokok = 0.76 + 13.22 + 0.76
= 14.74 m
- Panjang total tulangan pokok = 6.00 x 14.74
= 88.44 m
- Volume tulangan = 88.44 x 2.22
= 196.35 kg
- Total volume tulangan = 196.35 x 4.00
= 785.40 kg
b. Tulangan Pokok Tengah ( Ø 16 mm )
- Diameter tulangan (Ø) = 16.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 18.89 kg
- Berat besi per-1 m' = 1.57 kg
- Jumlah tulangan pokok = 2.00 bh
- Overlap untuk sambungan (40d) = 0.64 m
- Panjang 1 bh tulangan pokok = 0.64 + 0.00 + 0.64
= 1.28 m
- Panjang total tulangan pokok = 2.00 x 1.28
= 2.56 m
- Volume tulangan = 2.56 x 1.57
= 4.03 kg
- Total volume tulangan = 4.03 x 4.00
= 16.12 kg
c. Tulangan Sengkang/begol ( Ø 10 mm )
- Diameter tulangan (Ø) = 10.00 mm
- Panjang besi per-batang = 12.00 m
- Berat besi per-batang = 7.38 kg
- Berat besi per-1 m' = 0.62 kg
- Selimut beton = 0.030 m
- Jarak spasi tulangan = 0.10 m
- Lebar tulangan sengkang = 0.01 m
- Tinggi tulangan sengkang = 0.01 m
- Pembengkokan 135° (6d) = 0.075 m
- Panjang 1 bh tul. Sengkang = 0.20 m
- Banyak tulangan sengkang = 13.22 / 0.10
= 132.20 bh Pembulatan = 133.00 bh
- Volume tulangan = 133.00 x 0.20 x 0.62
= 15.95 kg
- Total volume tulangan = 15.95 x 4.00
= 63.80 kg
= 785.40 + 16.12 + 63.80
= 865.32 kg
c. Beton K-350
Lebar BR3 = 0.35 m
Tinggi BR3 = 0.40 m
Panjang BR3 = 13.22 m
Jumlah BR3 = 4.00 bh
Volume Beton = 0.35 x 0.40 x 13.22 x 4.00
= 7.40 m3
2. Pek. Gording a. Gording C200x70x7x10
Arah Samping
Samping 1 = 4.00unit
panjang = 25.18 m
total = 100.72 m
Samping 2 = 22.00unit
panjang = 21.68 m
total = 476.96 m
Arah Depan
Depan 1 = 2.00unit
panjang = 4.30 m
total = 8.60 m
Depan 2 = 2.00unit
panjang = 3.61 m
total = 7.22 m
Depan 3 = 2.00unit
panjang = 3.82 m
total = 7.64 m
Depan 4 = 16.00unit
panjang = 5.97 m
total = 95.52 m
Depan 5 = 14.00unit
panjang = 1.50 m
total = 21.00 m
Depan 6 = 14.00unit
panjang = 2.56 m
total = 35.84 m
Volume total = 753.50 m
3. Genteng Luasan = 1,155.00 m2
4. Sargod
5. Ikatan Angin
6. Aaksesoris (baut)

7. Pek. Dak Beton


8. Pek. Kanopy - Perhitungan Luas Kanopy
Kanopy Jalur Kendaraan
Luas Kanopy = 191.14 m2
Teras Depan
Lebar = 1.52 m
Panjang = 33.05 m
Luas Kanopy = 1.52 x 33.05
= 50.24 m2
Serambi Kanan dan Kiri
Lebar = 33.13 m
Panjang = 1.54 m
Luas Kanopy = 33.13 x 1.54 x 2.00
= 102.04 m2
Total Luas Kanopy
= 191.14 + 50.24 + 102.04
= 343.42 m2
- Perhitungan Kolom Kanopy

VII PEKERJAAN PLAFOND


1. Pek. Rangka Plafond Alumunium Hollow 4x4/4, Jarak / Grid 60 x 60 cm - Perhitungan Luas Rangka Plafond
Plafond Dalam / Ruangan Panti Umat
Jumlah bidang = 1.00 bh
Lebar = 24.30 m
Panjang = 26.20 m
Luas - a = 1.00 x 24.30 x 26.20 = 636.66 m2
Plafond Dalam / Panti Imam
Jumlah bidang = 1.00 bh
Lebar = 3.00 m
Panjang = 5.38 m
Luas - b = 1.00 x 3.00 x 5.38 = 16.14 m2
Plafond Dalam / Ruang Gamelan
Jumlah bidang = 1.00 bh
Lebar = 4.16 m
Panjang = 5.77 m
Luas - c = 1.00 x 4.16 x 5.77 = 24.00 m2
Plafond Dalam / Ruang Sakristi
Jumlah bidang = 1.00 bh
Lebar = 3.85 m
Panjang = 4.33 m
Luas - d = 1.00 x 3.85 x 4.33 = 16.67 m2
Plafond Dalam / Ruang Ganti Romo
Jumlah bidang = 1.00 bh
Lebar = 2.73 m
Panjang = 8.48 m
Luas - e = 1.00 x 2.73 x 8.48 = 23.15 m2
Plafond Dalam / Ruang Ganti Misdinar
Jumlah bidang = 1.00 bh
Lebar = 4.14 m
Panjang = 5.38 m
Luas - f = 1.00 x 4.14 x 5.38 = 22.27 m2
Plafond Dalam / Ruang Pengakuan Dosa
Jumlah bidang = 4.00 bh
Lebar = 1.48 m
Panjang = 1.85 m
Luas - g = 4.00 x 1.48 x 1.85 = 10.95 m2
Plafond Dalam / Gudang
Jumlah bidang = 1.00 bh
Lebar = 1.04 m
Panjang = 4.00 m
Luas - h = 1.00 x 1.04 x 4.00 = 4.16 m2
Plafond Luar
Jumlah bidang = 1.00 bh
Lebar = 3.25 m
Panjang = 8.48 m
Luas - i = 1.00 x 3.25 x 8.48 - 8.93 = 18.63 m2
Total Luas Rangka Plafond
Plafond Dalam / Ruangan Panti Umat = 636.66 m2
Plafond Dalam / Panti Imam = 16.14 m2
Plafond Dalam / Ruang Gamelan = 24.00 m2
Plafond Dalam / Ruang Sakristi = 16.67 m2
Plafond Dalam / Ruang Ganti Romo = 23.15 m2
Plafond Dalam / Ruang Ganti Misdinar = 22.27 m2
Plafond Dalam / Ruang Pengakuan Dosa = 10.95 m2
Plafond Dalam / Gudang = 4.16 m2
Plafond Luar = 18.63 m2 +
Jumlah = 772.64 m2
2. Pek. Plafond Gypsum Kalsiboard Tebal 9 mm (120x240) - Perhitungan Luas Plafond
Plafond Dalam / Ruangan Panti Umat
Jumlah bidang = 1.00 bh
Lebar = 24.30 m
Panjang = 26.20 m
Luas - a = 1.00 x 24.30 x 26.20 = 636.66 m2
Plafond Dalam / Panti Imam
Jumlah bidang = 1.00 bh
Lebar = 3.00 m
Panjang = 5.38 m
Luas - b = 1.00 x 3.00 x 5.38 = 16.14 m2
Plafond Dalam / Ruang Gamelan
Jumlah bidang = 1.00 bh
Lebar = 4.16 m
Panjang = 5.77 m
Luas - c = 1.00 x 4.16 x 5.77 = 24.00 m2
Plafond Dalam / Ruang Sakristi
Jumlah bidang = 1.00 bh
Lebar = 3.85 m
Panjang = 4.33 m
Luas - d = 1.00 x 3.85 x 4.33 = 16.67 m2
Plafond Dalam / Ruang Ganti Romo
Jumlah bidang = 1.00 bh
Lebar = 2.73 m
Panjang = 8.48 m
Luas - e = 1.00 x 2.73 x 8.48 = 23.15 m2
Plafond Dalam / Ruang Ganti Misdinar
Jumlah bidang = 1.00 bh
Lebar = 4.14 m
Panjang = 5.38 m
Luas - f = 1.00 x 4.14 x 5.38 = 22.27 m2
Plafond Dalam / Ruang Pengakuan Dosa
Jumlah bidang = 4.00 bh
Lebar = 1.48 m
Panjang = 1.85 m
Luas - g = 4.00 x 1.48 x 1.85 = 10.95 m2
Plafond Dalam / Gudang
Jumlah bidang = 1.00 bh
Lebar = 1.04 m
Panjang = 4.00 m
Luas - h = 1.00 x 1.04 x 4.00 = 4.16 m2
Plafond Luar
Jumlah bidang = 1.00 bh
Lebar = 3.25 m
Panjang = 8.48 m
Luas - i = 1.00 x 3.25 x 8.48 - 8.93 = 18.63 m2
Total Luas Plafond
Plafond Dalam / Ruangan Panti Umat = 636.66 m2
Plafond Dalam / Panti Imam = 16.14 m2
Plafond Dalam / Ruang Gamelan = 24.00 m2
Plafond Dalam / Ruang Sakristi = 16.67 m2
Plafond Dalam / Ruang Ganti Romo = 23.15 m2
Plafond Dalam / Ruang Ganti Misdinar = 22.27 m2
Plafond Dalam / Ruang Pengakuan Dosa = 10.95 m2
Plafond Dalam / Gudang = 4.16 m2
Plafond Luar = 18.63 m2 +
Jumlah = 716.62 m2
3. Pek. Lisprofil / Lisplafond Uk. 4 x 4 cm - Perhitungan Panjang Lisprofil
Lisprofil Dalam / Ruangan Panti Umat
Jumlah bidang = 2.00 bh
Panjang = 24.30 + 26.20 + + + = 50.50 m
Total Panjang - a = 2.00 x 50.50 = 101.00 m
Lisprofil Dalam / Panti Imam
Jumlah bidang = 2.00 bh
Panjang = 3.00 + 5.38 + + + = 8.38 m
Total Panjang - b = 2.00 x 8.38 = 16.76 m
Lisprofil Dalam / Ruang Gamelan
Jumlah bidang = 2.00 bh
Panjang = 4.16 + 5.77 + + + = 9.93 m
Total Panjang - c = 2.00 x 9.93 = 19.86 m
Lisprofil Dalam / Ruang Sakristi
Jumlah bidang = 2.00 bh
Panjang = 3.85 + 4.33 + + + = 8.18 m
Total Panjang - d = 2.00 x 8.18 = 16.36 m
Lisprofil Dalam / Ruang Ganti Romo
Jumlah bidang = 2.00 bh
Panjang = 2.73 + 8.48 + + + = 11.21 m
Total Panjang - e = 2.00 x 11.21 = 22.42 m
Lisprofil Dalam / Ruang Ganti Misdinar
Jumlah bidang = 2.00 bh
Panjang = 4.14 + 5.38 + + + = 9.52 m
Total Panjang - f = 2.00 x 9.52 = 19.04 m
Lisprofil Dalam / Ruang Pengakuan Dosa
Jumlah bidang = 2.00 bh
Panjang = 1.48 + 1.85 + + + = 3.33 m
Total Panjang - g = 2.00 x 3.33 = 6.66 m
Lisprofil Dalam / Gudang
Jumlah bidang = 2.00 bh
Panjang = 1.04 + 4.00 + + + = 5.04
Total Panjang - g = 2.00 x 5.04 = 10.08 m
Lisprofil Luar
Jumlah bidang = 1.00 bh
Panjang = 1.62 + 1.73 + 5.38 + 1.73 + 1.62 = 12.08
Total Panjang - g = 1.00 x 12.08 = 12.08 m
Total Panjang Lisprofil / Lisplafond
Lisprofil Dalam / Ruangan Panti Umat = 101.00 m
Lisprofil Dalam / Panti Imam = 16.76 m
Lisprofil Dalam / Ruang Gamelan = 19.86 m
Lisprofil Dalam / Ruang Sakristi = 16.36 m
Lisprofil Dalam / Ruang Ganti Romo = 22.42 m
Lisprofil Dalam / Ruang Ganti Misdinar = 19.04 m
Lisprofil Dalam / Ruang Pengakuan Dosa = 6.66 m
Lisprofil Dalam / Gudang = 10.08 m
Lisprofil Luar = 12.08 m +
Jumlah = 176.40 m
VIII PEKERJAAN LANTAI
1. Pek. Urugan Tanah dibawah Lantai - Perhitungan Volume Urugan Tanah dibawah Lantai
Ruangan Kelas - a
Jumlah = 1.00 bh
Luas lantai = 956.79 m2
Volume = 1.00 x 956.79 x 0.1 = 95.68 m3

2. Pek. Plat Lantai 1 - Pembesian


P6 - 200 = 956.79 m2 1M2 30m P6
- Cor Beton K350
Volume Beton = 956.79 x 0.06
= 57.41 m3
3. Pek. Plat Lantai 2 - Perhitungan Volume Bekisting Plat Lantai 2

- Perhitungan Volume Pembesian Plat Lantai 2

- Perhitungan Volume Cor Beton Plat Lantai 1

4. Pek. Lantai Keramik Uk. 60 x 60 Cm - Perhitungan Luas Lantai Keramik


Ruangan Panti Umat
Jumlah = 1.00 bh
Lebar = 24.30 m xl h
Panjang = 26.20 m
Luas lantai - a = 1.00 x 24.30 x 26.20 = 636.66 m2
Ruang Panti Imam
Jumlah = 1.00 bh
Lebar = 3.00 m xl h
Panjang = 5.38 m
Luas lantai - b = 1.00 x 3.00 x 5.38 = 16.14 m2
Ruang Gamelan
Jumlah = 1.00 bh
Lebar = 4.16 m xl h
Panjang = 5.77 m
Luas lantai - c = 1.00 x 4.16 x 5.77 = 24.00 m2
Ruang Sakristi
Jumlah = 1.00 bh
Lebar = 3.85 m xl h
Panjang = 4.33 m
Luas lantai - d = 1.00 x 3.85 x 4.33 = 16.67 m2
Ruang Ganti Romo
Jumlah = 1.00 bh
Lebar = 2.73 m xl h
Panjang = 8.48 m
Luas lantai - e = 1.00 x 2.73 x 8.48 = 23.15 m2
Ruang Ganti Misdinar
Jumlah = 1.00 bh
Lebar = 4.14 m xl h
Panjang = 5.38 m
Luas lantai - f = 1.00 x 4.14 x 5.38 = 22.27 m2
Ruang Pengakuan Dosa
Jumlah = 1.00 bh
Lebar = 1.48 m xl h
Panjang = 1.85 m
Luas lantai - g = 1.00 x 1.48 x 1.85 = 2.74 m2
Gudang
Jumlah = 1.00 bh
Lebar = 1.04 m xl h
Panjang = 4.00 m
Luas lantai - h = 1.00 x 1.04 x 4.00 = 4.16 m2
Total Luas Lantai Keramik
Ruangan Panti Umat = 636.66 m2
Ruang Panti Imam = 16.14 m2
Ruang Gamelan = 24.00 m2
Ruang Sakristi = 16.67 m2
Ruang Ganti Romo = 23.15 m2
Ruang Ganti Misdinar = 22.27 m2
Ruang Pengakuan Dosa = 2.74 m2
Gudang = 4.16 m2 +
Jumlah = 745.80 m2
5. Pek. Lantai Keramik Uk. 40 x 40 Cm - Perhitungan Luas Lantai Keramik
Selasar / Teras Depan
Jumlah = 1.00 m
Lebar = 2.10 m
Panjang = 31.90 m
Luas lantai = 1.00 x 2.10 x 31.90 = 66.99 m2
Selasar / Teras Samping Kanan dan Kiri
Jumlah = 2.00 m
Lebar = 28.80 m
Panjang = 2.50 m
Luas lantai = 2.00 x 28.80 x 2.50 = 144.00 m2
Total Luas Lantai Keramik
Selasar / Teras Depan = 66.99 m2
Selasar / Teras Samping Kanan dan Kiri = 144.00 m2 +
Jumlah = 210.99 m2
6. Pek. Pasang List Keramik - Perhitungan Panjang List Keramik
Ruangan Panti Umat
Sisi atas = 1.00 x 14.50 = 14.50 m
Sisi kanan dan kiri = 2.00 x 5.20 = 10.40 m
Sisi bawah = 1.00 x 4.50 = 4.50 m
Panjang = 14.50 + 10.40 + 4.50 = 24.90 m
Ruang Panti Imam
Sisi atas = 1.00 x 5.40 = 5.40 m
Sisi kanan dan kiri = 2.00 x 1.80 = 3.60 m
Panjang = 5.40 + 3.60 = 9.00 m
Ruang Gamelan
Sisi kanan dan kiri = 1.00 x 4.10 = 4.10 m
Panjang = 4.10 = 4.10 m
Ruang Sakristi
Sisi atas = 1.00 x 2.10 = 2.10 m
Sisi kanan dan kiri = 1.00 x 5.80 = 5.80 m
Sisi bawah = 1.00 x 3.20 = 3.20 m
Panjang = 5.30 + 5.80 = 11.10 m
Ruang Ganti Romo
Sisi atas dan bawah = 2.00 x 5.38 = 10.76 m
Sisi kanan dan kiri = 2.00 x 5.80 = 11.60 m
Panjang = 10.76 + 11.60 = 22.36 m
Ruang Ganti Misdinar
Sisi atas = 1.00 x 5.00 = 5.00 m
Sisi kanan dan kiri = 1.00 x 2.70 = 2.70 m
Sisi bawah = 1.00 x 6.10 = 6.10 m
Panjang = 5.00 + 2.70 = 7.70 m
Ruang Pengakuan Dosa
Sisi atas = 4.00 x 1.85 = 7.40 m
Sisi kanan dan kiri = 7.00 x 1.35 = 9.45 m
Sisi bawah = 3.00 x 1.80 = 5.40 m
Panjang = 12.80 + 9.45 = 22.25 m
Gudang
Sisi atas dan bawah = 2.00 x 3.70 = 7.40 m
Sisi kanan dan kiri = 2.00 x 0.84 = 1.68 m
Panjang = 7.40 + 1.68 = 9.08 m
Selasar / Teras Depan
Sisi atas = 1.00 x 26.50 = 26.50 m
Panjang = 26.50 + = 26.50 m
Selasar / Teras Samping Kanan dan Kiri
Sisi kanan dan kiri = 2.00 x 28.80 = 57.60 m
Panjang = 57.60 + = 57.60 m
Total Panjang list Keramik
Ruangan Panti Umat = 24.90 m
Ruang Panti Imam = 9.00 m
Ruang Gamelan = 4.10 m
Ruang Sakristi = 11.10 m
Ruang Ganti Romo = 22.36 m
Ruang Ganti Misdinar = 7.70 m
Ruang Pengakuan Dosa = 22.25 m
Gudang = 9.08 m
Selasar / Teras Depan = 26.50 m
Selasar / Teras Samping Kanan dan Kiri = 57.60 m +
Jumlah = 194.59 m
IX PEKERJAAN RABAT BETON DAN SALURAN KELILING
1. Pek. Saluran Keliling 1a. Pek. Galian Tanah Biasa
Saluran Depan, Belakang, S. Kiri dan S. Kanan - a
Panjang = 19.70 + 19.70 + 10.70 + 10.70 = 60.80 m
Lebar galian = 0.50 m
Tinggi galian = 0.35 m
Volume - a = 60.80 x 0.50 x 0.35 = 10.64 m3

Bak Kontrol - b
Jumlah = 4.00 bh
Lebar galian - 1 = 0.65 m
Lebar galian - 2 = 0.65 m
Tinggi galian = 0.45 m
Volume - b = 4.00 x 0.65 x 0.65 x 0.45 = 0.76 m3

Total Volume Galian


Saluran Depan, Belakang, S. Kiri dan S. Kanan - a = 10.64 m3
Bak Kontrol - b = 0.76 m3 +
Jumlah = 11.40 m3

1b. Pek. Lantai Saluran, Cor Beton Mutu K-175


Saluran Depan, Belakang, Samping Kiri dan Samping Kanan - a
Panjang = 20.00 + 20.00 + 11.00 + 11.00 = 62.00 m
Lebar = 0.50 m
Tebal coran = 0.10 m
Volume - a = 62.00 x 0.50 x 0.10 = 3.10 m3

Bak Kontrol - b
Jumlah = 4.00 bh
Lebar - 1 = 0.65 m
Lebar - 2 = 0.65 m
Tebal = 0.10 m
Volume - b = 4.00 x 0.65 x 0.65 x 0.10 = 0.17 m3

Total Volume Cor Beton


Saluran Depan, Belakang, S. Kiri dan S. Kanan - a = 3.10 m3
Bak Kontrol - b = 0.17 m3 +
Jumlah = 3.27 m3

1c. Pek. Pasangan Bata 1Pc : 4Ps, Tbl. 1/2 Batu


Saluran Depan, Belakang, Samping Kiri dan Samping Kanan - a
Panjang = 20.00 + 20.00 + 11.00 + 11.00 = 62.00 m
Tinggi pasangan = 0.30 m
Luas - a = 2.00 x 62.00 x 0.30 = 37.20 m2

Bak Kontrol - b
Jumlah = 4.00 bh
Panjang = 1.30 m
Tinggi pasangan = 0.40 m
Luas - b = 4.00 x 1.30 x 0.40 = 2.08 m2

Total Luas Pasangan Bata


Saluran Depan, Belakang, S. Kiri dan S. Kanan - a = 37.20 m2
Bak Kontrol - b = 2.08 m2 +
Jumlah = 39.28 m2

1d. Pek. Plesteran 1Pc : 4Ps, Tbl. 20 mm


Saluran Depan, Belakang, Samping Kiri dan Samping Kanan - a
Panjang = 20.00 + 20.00 + 11.00 + 11.00 = 62.00 m
Lebar Plasteran = 0.90 m
Luas - a = 62.00 x 0.90 = 55.80 m2

Bak Kontrol - b
Jumlah = 4.00 bh
Panjang = 1.30 m
Lebar Plasteran = 0.60 m
Luas - b = 4.00 x 1.30 x 0.60 = 3.12 m2

Total Luas Plesteran


Saluran Depan, Belakang, S. Kiri dan S. Kanan - a = 55.80 m2
Bak Kontrol - b = 3.12 m2 +
Jumlah = 58.92 m2

1e. Pek. Acian


Luas Acian = 1.00 x Luas plesteran
= 1.00 x 58.92 = 58.92 m2

2. Pek. Rabat Beton Keliling 2a. Pek. Pasir Urug, Tbl. 5 Cm


Panjang rata-rata = 57.80 m
Lebar = 0.70 m
Tebal = 0.05 m
Volume = 57.80 x 0.70 x 0.05 = 2.02 m3

2b. Pek. Cor Beton Mutu K-175, Tbl. 10 Cm


Panjang rata-rata = 58.40 m
Lebar = 0.93 m
Tebal = 0.10 m
Volume = 58.40 x 0.93 x 0.10 = 5.43 m3
2c. Pek. Finishing Rabat Beton dengan Acian
Panjang rata-rata = 58.40 m
Lebar = 0.93 m
Luas = 58.40 x 0.93 = 54.31 m2

X PEKERJAAN INSTALASI LISTRIK


1. Pek. Pasang MCB

2. Pek. Instalasi Listrik

3. Pek. Pasang Stop Kontak

4. Pek. Pasang Saklar Tunggal

5. Pek. Pasang Saklar Ganda

6. Pek. Pasang Lampu LG Type1 1

7. Pek. Pasang Lampu LG Type1 2

8. Pek. Pasang Lampu DL

9. Pek. Pasang Lampu Otomatis

10. Pek. Pasang Fitting Lampu

11. Pek. Pasang Lampu LED Strip

XI PEKERJAAN PENGECATAN
1. Pek. Pengecatan Plafond - Perhitungan Volume Cat Kayu untuk Plafond
Ket : volume cat sama dengan luas pemasangan plafond
Total Luas Plafond
Plafond Dalam / Ruangan - a = 636.66 m2
Plafond Luar / Selasar atau Teras Depan - b = 16.14 m2
Plafond Luar / Sisi Belakang - c = 24.00 m2
Plafond Luar / Sisi Samping Kiri - d = 16.67 m2
Plafond Luar / Sisi Samping Kanan - e = 23.15 m2 +
Jumlah = 716.62 m2
2. Pek. Pengecatan Lisprofil / lisplafond - Perhitungan Volume Cat Kayu untuk Lisprofil / lisplafond
Total Panjang Lisprofil / Lisplafond
Plafond Dalam / Ruangan - a = 101.00 m
Plafond Luar / Selasar atau Teras Depan - b = 16.76 m
Plafond Luar / Sisi Belakang - c = 19.86 m
Plafond Luar / Sisi Samping Kiri - d = 16.36 m
Plafond Luar / Sisi Samping Kanan - e = 22.42 m +
Jumlah = 176.40 m
Bagian sisi yang dicat = 0.06 m
Luas = 0.06 x 176.40 = 10.58 m2
3. Pek. Pengecatan Dinding Interior Luas Dinding = p x t x jumlah + p x t x jumlah
= 2.62 x 3.5 x 4 + 2.86 x 3.50 x 2
= 56.70 m2
4. Pek. Pengecatan Dinding Eksterior Luas Dinding = p x t x jumlah + p x t x jumlah
= 2.62 x 3.5 x 3 + 2.86 x 3.50 x 2
= 47.53 m2
4. Pek. Pengecatan Dinding Eksterior LUAS PINTU

XII PEKERJAAN LAIN-LAIN


1. Pekerjaan Box Planter Pemasangan box planter di sebelah kanan dan kiri bangunan
2. Pekerjaan Vegetasi Pekerjaan vegetasi di area outdoor gereja
3. Pekerjaan Tangga Luar dan Dalam 1. Urugan tanah sedalam 1 m
Volume = 1.00 x 20.13 = 21.13 m3
2. Pasangan batu kali
Luas penampang = 1.29 m2
Volume = Luas x Panjang
= 1.29 x 20.13
= 25.97 m3
4. Pekerjaan Tangga Putar ke Lt. 2 Pemasangan tangga putar ke Ruangan Audio Visual
RHITUNGAN VOLUME PEKERJAAN

VOLUME

1.00 Ls
1.00 Ls
162.60 M1

61.20 M2

1.00 Ls
9.00 M2

9.00 M2

1,602.72 M2

1.00 Ls
1.00 Ls
1.00 Ls

473.10 M3

7.89 M3

31.54 M3

93.63 M3

119.85 M3

226.98 M2

6,440.75 Kg
72.41 M3

18.52 M2

412.53 Kg
5.15 M3

43.36 M2

578.69 Kg

6.57 M3
10.77 M2

194.66 Kg

3.25 M3

125.60 m2
7,645.14 Kg
32.47 M3

149.04 M2

5,461.42 Kg
16.56 M3

133.92 M2

5,978.50 kg
16.99 M3

19.58 M2

343.30 Kg
1.47 M3

60.48 M2

1,634.85 Kg
5.67 M3

39.60 M2

728.85 Kg
3.30 M3

123.92 M2

2,201.15 Kg
9.53 M3

138.43 M2
2,567.26 Kg
9.23 M3

294.94 M2

589.87 M2

589.87 M2

31.24 M2

78.84 M2

33.54 M2

1.58 M3
20,151.40 Kg

1.12 m2

865.32 Kg
7.40 M3

753.50 M

1,155.00 m2

ls
772.64 M2

716.62 M2
176.40 M1
95.68 M3

956.79 M2

57.41 M3

0.00 M2

0.00 M2

0.00 M3

745.80 M2
210.99 M2

194.59 M1

11.40 M3
3.27 M3

39.28 M2

58.92 M2

58.92 M2

2.02 M3

5.43 M3
54.31 M2

1.00 Set

102.00 Ttk

5.00 BH

5.00 BH

9.00 BH

22.00 BH

11.00 BH

86.00 BH

16.00 BH

33.00 BH

716.62 M2

10.58 M2

56.70 M2

47.53 M2

0.00 M2

2.00 ls
1.00 ls
21.13 M3

25.97 M3

2.00 Bh