NO JENIS PEKERJA BANGUNAN HARGA UPAH SATUAN WAKTU KODE
Rp.
1 PEKERJA 155,000 1 ORANG/ HR/ 7 JAM L. 01
2 TUKANG BATU/GALI 160,000 1 ORANG/ HR/ 7 JAM L. 02 3 KEPALA TUKANG BATU 175,000 1 ORANG/ HR/ 7 JAM L. 03 4 TUKANG KAYU 160,000 1 ORANG/ HR/ 7 JAM L. 04 5 KEPALA TUKANG KAYU 175,000 1 ORANG/ HR/ 7 JAM L. 05 6 TUKANG CAT / PELITUR 160,000 1 ORANG/ HR/ 7 JAM L. 06 7 KEPALA TUKANG CAT / PELITUR 175,000 1 ORANG/ HR/ 7 JAM L. 07 8 TUKANG BESI BETON 160,000 1 ORANG/ HR/ 7 JAM L. 08 9 KEPALA TUKANG BESI BETON 175,000 1 ORANG/ HR/ 7 JAM L. 09 10 TUKANG BESI PROFIL 160,000 1 ORANG/ HR/ 7 JAM L. 10 11 TUKANG ALUMUNIUM 160,000 1 ORANG/ HR/ 7 JAM L. 10 12 KEPALA TUKANG BESI PROFIL 175,000 1 ORANG/ HR/ 7 JAM L. 11 13 KEPALA TUKANG ALUMUNIUM 175,000 1 ORANG/ HR/ 7 JAM L. 10 14 TUKANG KACA 160,000 1 ORANG/ HR/ 7 JAM L. 10 15 KEPALA TUKANG KACA 175,000 1 ORANG/ HR/ 7 JAM L. 10 16 MANDOR 200,000 1 ORANG/ HR/ 7 JAM L. 12 17 OPERATOR ALAT BESAR 190,000 1 ORANG/ HR/ 7 JAM L. 13 18 PEMBANTU OPERATOR / MEKANIK 160,000 1 ORANG/ HR/ 7 JAM L. 14 19 SUPIR TRUK 190,000 1 ORANG/ HR/ 7 JAM L. 15 20 KENEK TRUK 160,000 1 ORANG/ HR/ 7 JAM L. 16 21 PENJAGA MALAM 160,000 1 ORANG/ HR/ 7 JAM L. 17