Anda di halaman 1dari 98

DAFTAR SATUAN UPAH PEKERJA

NO. JENIS PEKERJA BANGUNAN HARGA UPAH SATUAN WAKTU


Rp.
1 PEKERJA 65,000 1 ORANG/ HR/ 8 JAM
2 TUKANG GALI 75,000 1 ORANG/ HR/ 8 JAM
3 TUKANG LISTRIK 80,000 1 ORANG/ HR/ 8 JAM
4 TUKANG BATU TERAMPIL 80,000 1 ORANG/ HR/ 8 JAM
5 KEPALA TUKANG BATU 90,000 1 ORANG/ HR/ 8 JAM
6 TUKANG KAYU TERAMPIL 80,000 1 ORANG/ HR/ 8 JAM
7 KEPALA TUKANG KAYU 90,000 1 ORANG/ HR/ 8 JAM
8 TUKANG CAT / PELITUR TERAMPIL 80,000 1 ORANG/ HR/ 8 JAM
9 KEPALA TUKANG CAT / PELITUR 90,000 1 ORANG/ HR/ 8 JAM
10 TUKANG BESI BETON TERAMPIL 80,000 1 ORANG/ HR/ 8 JAM
11 KEPALA TUKANG BESI BETON 90,000 1 ORANG/ HR/ 8 JAM
12 TUKANG BESI PROFIL TERAMPIL 80,000 1 ORANG/ HR/ 8 JAM
13 KEPALA TUKANG BESI PROFIL 90,000 1 ORANG/ HR/ 8 JAM
14 TUKANG PIPA 80,000 1 ORANG/ HR/ 8 JAM
15 MANDOR 100,000 1 ORANG/ HR/ 8 JAM
16 OPERATOR MEKANIK 150,000 1 ORANG/ HR/ 8 JAM
17 PEMBANTU OPERATOR / MEKANIK 100,000 1 ORANG/ HR/ 8 JAM
18 OPERATOR ALAT BERAT TERLATIH 150,000 1 ORANG/ HR/ 8 JAM
19 SUPIR TRUK 100,000 1 ORANG/ HR/ 8 JAM
20 KENEK TRUK 70,000 1 ORANG/ HR/ 8 JAM
21 BURUH LAPANGAN TAK TERLATIH 55,000 1 ORANG/ HR/ 8 JAM
22 BURUH LAPANGAN TERLATIH 60,000 1 ORANG/ HR/ 8 JAM
DAFTAR HARGA SEWA ALAT BERAT

NO JENIS ALAT SATUAN HARGA SATUAN

1 2 3 4

1 Buldozer /jam 300,000.00


2 Motor Grader /jam 300,000.00
3 Whell loader /jam 250,000.00
4 Dump truck 3,5 ton /jam 150,000.00
5 Dump truck 5 ton /jam 165,000.00
6 Truk Bak terbuka 3,50 ton /jam 150,000.00
7 Mesin Gilas (6-8) ton /jam 135,000.00
8 Mesin Gilas (8-10) ton /jam 150,000.00
9 Mesin gilas tendem (6-8)ton /jam 125,000.00
10 Mesin gilas roda karet /jam 110,000.00
11 Mesin gilas bergetar /jam 150,000.00
12 Mesin Temper /jam 35,000.00
13 Alat Penggetar Beton /jam 30,000.00
14 Asphalt Sprayer /jam 45,000.00
15 Asphalt Finisher /jam 120,000.00
16 Truk tangki air /jam 115,000.00
17 Pengaduk beton /jam 40,000.00
18 Blower /jam 40,000.00
19 Compresor /jam 35,000.00
20 Pompa air /jam 20,000.00
21 Backhoe/Exapator /jam 300,000.00
DAFTAR HARGA BAHAN
KABUPATEN CIANJUR
TAHUN ANGGARAN 2016

HARGA
NO JENIS BAHAN-BAHAN SATUAN SATUAN
( Rp. )
a b c d
AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
1 Tanah Urug m3 90,000.00
2 Pasir urug m3 105,000.00
3 Pasir pasang kali m3 165,000.00
4 Pasir beton m3 180,000.00
5 Abu Batu m3 185,000.00
6 Batu pecah mesin 1/2 m3 185,000.00
7 Batu pecah mesin 2/3 m3 180,000.00
8 Batu pecah mesin 3/5 m3 175,000.00
9 Batu pecah mesin 5/7 m3 170,000.00
10 Batu belah pondasi m3 165,000.00
11 Sirtu m3 145,000.00
12 Bata merah Kelas I bh 900.00
13 Sement PC ( 50 Kg) zak 73,000.00
14 Sement PC kg 1,460.00
15 Sement Warna kg 11,500.00
16 Semant Putih 40 kg zak 95,000.00

BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA


1 Cat tembok kg 23,000.00
2 Cat Tembok Acrilic kg 52,000.00
3 Cat Tembok Eksterior Wheatershield kg 85,000.00
4 Cat kayu kg 50,000.00
5 Cat besi kg 50,000.00
6 Plamir tembok kg 15,000.00
7 Dempul kayu kg 14,000.00
8 Meni kayu/besi kg 20,000.00
9 Zinckromat kg 36,000.00
10 Rol cat tembok bh 18,000.00
11 Kwas 3" bh 12,500.00
12 Spritus ltr 11,000.00
13 Dempul plitur kg 25,000.00
14 Dempul halus/ impra (wood filler) kg 35,000.00
15 Terpentin ltr 6,000.00
16 Thinner A ltr 17,500.00
17 Thinner B ltr 23,000.00
18 Amplas lbr 4,000.00
19 Teak Oil kg 25,000.00
20 Bahan Bakar Solar ltr 7,000.00
21 Pelumas Alat Besar ltr 41,000.00
22 Pelumas bekisting / oli bekas ltr 2,500.00
23 Water Profing Emulsion m2 55,000.00
24 Plincote kg 35,000.00
25 Seal tape bh 3,000.00
HARGA
NO JENIS BAHAN-BAHAN SATUAN SATUAN
( Rp. )
a b c d
26 Aspal kg 17,000.00
HARGA
NO JENIS BAHAN-BAHAN SATUAN SATUAN
( Rp. )
a b c d
BAHAN KAYU BERIKUT BAHAN JADINYA
1 Kayu balok Rasamala / Klas. II m3 3,800,000.00
2 Kayu papan Rasamala / Klas. II m3 4,500,000.00
3 Kayu Albasia m3 2,000,000.00
4 Kayu Kaso 5/7 Rasamala m3 3,800,000.00
5 Kayu Reng 2/3 Rasamala / Klas. II m3 4,500,000.00
6 Kayu Reng 3/4 Rasamala / Klas. II m3 4,500,000.00
7 Dolken 5 s/d 7 btg 14,000.00
8 Dolken 7 s/d 10 btg 17,500.00
9 Reng Bambu btg 1,200.00
10 Kaso Bambu btg 10,000.00

BAHAN PENUTUP RANGKA PLAFOND DAN BAHAN KAYU LAPIS


1 Triplek 4 mm uk. 120 x 240 cm lbr 70,000.00
2 Triplek 4 mm uk. pintu lbr 60,000.00
3 Teakwood uk. pintu 3 mm lbr 99,000.00
4 Teakwood 3 mm uk. 120 x 240 cm lbr 131,000.00
5 Teakwood 4 mm uk. 120 x 240 cm lbr 135,000.00
6 Multipleks 9 mm lbr 150,000.00
7 Multipleks 12 mm lbr 220,000.00
8 Listplank GRC 20 cm m' 15,000.00
9 Listplank GRC 30 cm m' 20,000.00

BAHAN LANTAI DAN PELAPIS DINDING


1 Keramik 20 x 20 cm Kw1 DN Putih m2 60,000.00
2 Keramik 20 x 20 cm Kw1 DN warna/corak m2 70,000.00
3 Keramik 40 x 40 cm Kw1 DN m2 70,000.00
4 Keramik 30 x 30 cm Kw1 DN Putih m2 60,000.00
5 Keramik 30 x 30 cm Kw1 DN warna/corak m2 70,000.00
6 Keramik 20 x 25 cm Kw1 DN warna/corak m2 70,000.00
7 Batu Tempel Hitam m2 135,000.00
8 Paving Block Natural 6 cm m2 60,000.00
9 Paving Block Warna 6 cm m2 65,000.00

BAHAN SALURAN AIR KOTOR / BERSIH


1 Grevel uk. 20 cm m' 45,000.00
2 Grevel uk. 30 cm m' 65,000.00
3 Gorong - Gorong uk 30 cm m' 65,000.00
4 Gorong - Gorong uk 40 cm m' 75,000.00
5 Pipa PVC / Paralon diam. 1/2 " btg 28,100.00
6 Pipa PVC / Paralon diam. 2 " btg 85,000.00
7 Pipa besi diameter 1" btg 220,000.00
8 Kran air bh 85,000.00
9 Floor drain Stainles bh 90,000.00
10 Lem Kayu putih (FOX) Kg 9,000.00
11 Lem Kayu Kuning (Aibon) Kg 30,000.00

BAHAN LOGAM DAN BAHAN JADINYA


1 Besi beton U 24 kg 10,250.00
HARGA
NO JENIS BAHAN-BAHAN SATUAN SATUAN
( Rp. )
a b c d
2 Besi beton U 39 kg 10,250.00
3 Kawat pengikat beton kg 16,000.00
4 Kawat Las Listrik Φ 4 mm kg 22,000.00
HARGA
NO JENIS BAHAN-BAHAN SATUAN SATUAN
( Rp. )
a b c d
5 Besi/Baja Profil Ex. DN kg 10,250.00
6 Besi Baja Profil Siku kg 10,250.00
7 Wiremesh 5.4 m x 2.1 m Φ 8 mm m2 74,770.00

BAHAN PAKU DAN MUR BAUT


1 Paku 1 - 3 cm kg 16,400.00
2 Paku 4 - 7 cm kg 16,400.00
3 Paku 8 - 12 cm kg 14,500.00
4 Paku Beton 2 - 5 cm bh 300.00
5 Mur Baut HTB bh 20,000.00

BAHAN PENUTUP ATAP


1 Seng gelombang BJLS 03 uk. 80 x 180 cm lbr 65,000.00
2 Seng plaat BJLS 30 Lebar 90 Cm m' 35,000.00
3 Atap genteng metal lbr 135,000.00
4 Nok Genteng metal lbr 95,000.00
5 Atap Policarbonate Gelombang 0.6 x 1.8 m m' 180,000.00

BAHAN ALAT LISTRIK


1 Saklar bh 30,000.00
2 Stop Kontak bh 30,000.00
3 Lampu Pijar bh 25,000.00
4 Lampu SL bh 40,000.00
5 Lampu TL + Trafo bh 125,000.00
6 Lampu Baret bh 400,000.00
7 Lampu Down Light bh 145,000.00
ANALISA SATUAN PEKERJAAN

NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH

1 2 3 4 5 6=(3x5)
A.01 1 M2 PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M ANALISA PU
UPAH :
Pekerja 0.2000 OH 65,000.00 13,000.00
Tukang Kayu 0.4000 OH 80,000.00 32,000.00
Kepala Tukang 0.0200 OH 90,000.00 1,800.00
Mandor 0.0200 OH 100,000.00 2,000.00
Sub Jumlah 48,800.00
BAHAN :
Dolken kayu diameter
1.2500 Btg 17,500.00 21,875.00
8-10/400 cm
Semen Portland 2.5000 Kg 1,460.00 3,650.00
Seng gelombang 1.2000 Lbr #NAME? #NAME?
Pasir beton 0.0050 m3 #NAME? #NAME?
Koral beton 0.0090 m3 180,000.00 1,620.00
Kayu 5/7 0.0720 m3 #NAME? #NAME?
Paku Biasa 2" - 5" 0.0600 kg #NAME? #NAME?
Meni Besi 0.4500 Ltr #NAME? #NAME?
Sub Jumlah #NAME?
PERALATAN :

Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.02 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK ANALISA PU
UPAH :
Pekerja 0.1000 OH 65,000.00 6,500.00
Tukang Kayu 0.1000 OH 80,000.00 8,000.00
Kepala Tukang 0.0100 OH 90,000.00 900.00
Mandor 0.0050 OH 100,000.00 500.00
Sub Jumlah 15,900.00
BAHAN :
Kayu 5/7 0.0120 m3 #NAME? #NAME?
Paku Biasa 2"-3" 0.0200 Kg #NAME? #NAME?
Kayu Papan 3/20 0.0070 m3 #NAME? #NAME?
Sub Jumlah #NAME?
PERALATAN :

Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.03 1 M2 PEMBUATAN GUDANG SEMEN DAN PERALATAN ANALISA PU
UPAH :
Pekerja 1.0000 OH 65,000.00 65,000.00
Tukang Kayu 2.0000 OH 80,000.00 160,000.00
Kepala Tukang 0.2000 OH 90,000.00 18,000.00
Mandor 0.0500 OH 100,000.00 5,000.00
Sub Jumlah 248,000.00
BAHAN :
Dolken kayu diameter 8 - 10 cm/400 cm 1.7000 17,500.00 29,750.00
Kayu 0.2100 #NAME? #NAME?
1 2 3 4 5 6=(3x5)
Paku biasa 0.3000 #NAME? #NAME?
Semen Portland 10.5000 1,460.00 15,330.00
Pasir beton 0.0300 #NAME? #NAME?
Koral Beton 0.0500 180,000.00 9,000.00
Seng Gelombang 1.5000 #NAME? #NAME?
Seng plat 0.2500 #NAME? #NAME?
Sub Jumlah #NAME?
1 2 3 4 5 6=(3x5)
PERALATAN :

Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.04 1 M2 PEMBERSIHAN LAPANGAN DAN PERATAAN ANALISA PU
UPAH :
Pekerja 0.1000 OH 65,000.00 6,500.00
Mandor 0.0500 OH 100,000.00 5,000.00
Sub Jumlah 11,500.00
BAHAN :

Sub Jumlah -
PERALATAN :

Sub Jumlah -
Jumlah 11,500.00
Keuntungan Max. 10 % 1,150.00
Jumlah Total 12,650.00
Dibulatkan 12,650.00
A.05 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M ANALISA PU
UPAH :
Pekerja 0.7500 OH 65,000.00 48,750.00
Mandor 0.0250 OH 100,000.00 2,500.00
Sub Jumlah 51,250.00
BAHAN :

Sub Jumlah
PERALATAN :

Sub Jumlah -
Jumlah 51,250.00
Keuntungan Max. 10 % 5,125.00
Jumlah Total 56,375.00
Dibulatkan 56,375.00
A.06 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M ANALISA PU
UPAH :
Pekerja 0.9000 OH 65,000.00 58,500.00
Mandor 0.0450 OH 100,000.00 4,500.00
Sub Jumlah 63,000.00
BAHAN :

Sub Jumlah
PERALATAN :

Sub Jumlah -
Jumlah 63,000.00
Keuntungan Max. 10 % 6,300.00
Jumlah Total 69,300.00
Dibulatkan 69,300.00
A.07 1 M2 PEKERJAAN STRIPING TANAH ANALISA PU
UPAH :
Pekerja 0.0500 OH 65,000.00 3,250.00
1 2 3 4 5 6=(3x5)
Mandor 0.0050 OH 100,000.00 500.00
Sub Jumlah 3,750.00
BAHAN :

Sub Jumlah
1 2 3 4 5 6=(3x5)
PERALATAN :

Sub Jumlah -
Jumlah 3,750.00
Keuntungan Max. 10 % 375.00
Jumlah Total 4,125.00
Dibulatkan 4,125.00
A.08 1 M3 URUGAN TANAH KEMBALI ANALISA PU
UPAH :
Pekerja 0.5000 OH 65,000.00 32,500.00
Mandor 0.0500 OH 100,000.00 5,000.00
Sub Jumlah 37,500.00
BAHAN :

Sub Jumlah
PERALATAN :

Sub Jumlah -
Jumlah 37,500.00
Keuntungan Max. 10 % 3,750.00
Jumlah Total 41,250.00
Dibulatkan 41,250.00
A.09 1 M3 MEMADATKAN TANAH ( PER 20 CM) ANALISA PU
UPAH :
Pekerja 0.5000 OH 65,000.00 32,500.00
Mandor 0.0500 OH 100,000.00 5,000.00
Sub Jumlah 37,500.00
BAHAN :
- -
- -
Sub Jumlah -
PERALATAN :

Sub Jumlah -
Jumlah 37,500.00
Keuntungan Max. 10 % 3,750.00
Jumlah Total 41,250.00
Dibulatkan 41,250.00
A.10 1 M3 URUGAN PASIR URUG ANALISA PU
UPAH :
Pekerja 0.3000 OH 65,000.00 19,500.00
Mandor 0.0100 OH 100,000.00 1,000.00
Sub Jumlah 20,500.00
BAHAN :
Pasir Urug 1.2000 m³ #NAME? #NAME?

Sub Jumlah #NAME?


PERALATAN :

Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.11 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps ANALISA PU
UPAH :
Pekerja 1.5000 OH 65,000.00 97,500.00
1 2 3 4 5 6=(3x5)
Tukang 0.7500 OH 80,000.00 60,000.00
Kepala Tukang 0.0750 OH 90,000.00 6,750.00
Mandor 0.0750 OH 100,000.00 7,500.00
Sub Jumlah 171,750.00
1 2 3 4 5 6=(3x5)
BAHAN :
Batu Belah 15/20 1.2000 m³ #NAME? #NAME?
PC 202.0000 kg 1,460.00 294,920.00
Pasir Pasang 0.4850 m³ #NAME? #NAME?
Sub Jumlah #NAME?
PERALATAN :

Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.12 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps ANALISA PU
UPAH :
Pekerja 1.5000 OH 65,000.00 97,500.00
Tukang Batu 0.7500 OH 80,000.00 60,000.00
Kepala Tukang 0.0750 OH 90,000.00 6,750.00
Mandor 0.0750 OH 100,000.00 7,500.00
Sub Jumlah 171,750.00
BAHAN :
Batu Belah 15/20 1.2000 m³ #NAME? #NAME?
PC 136.0000 kg 1,460.00 198,560.00
Pasir Pasang 0.5440 m³ #NAME? #NAME?
Sub Jumlah #NAME?
PERALATAN :

Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.13 1 M3 PASANG AANSTAMPING BATU KOSONG ANALISA PU
UPAH :
Pekerja 0.7800 OH 65,000.00 50,700.00
Kepala Tukang 0.3900 OH 80,000.00 31,200.00
Kepala Tukang 0.0390 OH 90,000.00 3,510.00
Mandor 0.0390 OH 100,000.00 3,900.00
Sub Jumlah 89,310.00
BAHAN :
Batu Belah 15/20 1.2000 m³ #NAME? #NAME?
Pasir Urug 0.4320 m³ #NAME? #NAME?
Sub Jumlah #NAME?
PERALATAN :

Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.14 1 M3 MEMBUAT ADUKAN LANTAI KERJA f'c = 7.4 Mpa (K 100) ANALISA PU
UPAH :
Pekerja 1.2000 OH 65,000.00 78,000.00
Tukang Batu 0.2000 oh 80,000.00 16,000.00
Kepala Tukang 0.0200 OH 90,000.00 1,800.00
Mandor 0.0600 OH 100,000.00 6,000.00
Sub jumlah 101,800.00
BAHAN :
Semen Portland 230.000 kg 1,460.00 335,800.00
Pasir Beton 893.000 kg #NAME? #NAME?
1 2 3 4 5 6=(3x5)
Kerikil 1,027.000 kg 133.33 136,933.33
Air 200.000 ltr 200.00 40,000.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.15 1 M3 MEMBUAT ADUKAN BETON f'c = 7.4 Mpa (K 100) ANALISA PU
UPAH :
Pekerja 1.6500 OH 65,000.00 107,250.00
Tukang Batu 0.2750 OH 80,000.00 22,000.00
Kepala Tukang 0.0280 OH 90,000.00 2,520.00
Mandor 0.0830 OH 100,000.00 8,300.00
Sub jumlah 140,070.00
BAHAN :
Semen Portland 247.0000 kg 1,460.00 360,620.00
Pasir Beton 869.0000 kg #NAME? #NAME?
Kerikil 999.0000 kg 133.33 133,200.00
Air 215.0000 ltr 200.00 43,000.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.16 1 M3 MEMBUAT ADUKAN BETON f'c = 14.5 Mpa (K 175) ANALISA PU
UPAH :
Pekerja 1.6500 OH 65,000.00 107,250.00
Tukang Batu 0.2750 OH 80,000.00 22,000.00
Kepala Tukang 0.0280 OH 90,000.00 2,520.00
Mandor 0.0830 OH 100,000.00 8,300.00
Sub jumlah 140,070.00
BAHAN :
Semen Portland 326.0000 kg 1,460.00 475,960.00
Pasir Beton 760.0000 kg #NAME? #NAME?
Kerikil 1,029.0000 kg 133.33 137,200.00
Air 215.0000 ltr 200.00 43,000.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.17 1 M3 MEMBUAT ADUKAN BETON f'c = 19.3 Mpa (K 225) ANALISA PU
UPAH :
Pekerja 1.6500 OH 65,000.00 107,250.00
Tukang Batu 0.2750 OH 80,000.00 22,000.00
Kepala Tukang 0.0280 OH 90,000.00 2,520.00
Mandor 0.0830 OH 100,000.00 8,300.00
Sub jumlah 140,070.00
BAHAN :
Semen Portland 371.0000 kg 1,460.00 541,660.00
1 2 3 4 5 6=(3x5)
Pasir Beton 698.0000 kg #NAME? #NAME?
Kerikil 1,047.0000 kg 133.33 139,600.00
Air 215.0000 ltr 200.00 43,000.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
1 2 3 4 5 6=(3x5)
A.18 1 M3 MEMBUAT ADUKAN BETON f'c = 21.7 Mpa (K 250) ANALISA PU
UPAH :
Pekerja 1.6500 OH 65,000.00 107,250.00
Tukang Batu 0.2750 OH 80,000.00 22,000.00
Kepala Tukang 0.0280 OH 90,000.00 2,520.00
Mandor 0.0830 OH 100,000.00 8,300.00
Sub jumlah 140,070.00
BAHAN :
Semen Portland 384.0000 kg 1,460.00 560,640.00
Pasir Beton 692.0000 kg #NAME? #NAME?
Kerikil 1,039.0000 kg 133.33 138,533.33
Air 215.0000 ltr 200.00 43,000.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.19 10 Kg BESI BETON TERPASANG ANALISA PU
UPAH :
Pekerja 0.0700 OH 65,000.00 4,550.00
Tukang 0.0700 OH 80,000.00 5,600.00
Kepala Tukang 0.0070 OH 90,000.00 630.00
Mandor 0.0040 OH 100,000.00 400.00
Sub jumlah 11,180.00
BAHAN :
Besi Beton 10.5000 kg #NAME? #NAME?
Kawat beton 0.1500 kg #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.20 1 M2 BEKISTING UNTUK PONDASI ANALISA PU
UPAH :
Pekerja 0.5200 OH 65,000.00 33,800.00
Tukang 0.2600 OH 80,000.00 20,800.00
Kepala Tukang 0.0260 OH 90,000.00 2,340.00
Mandor 0.0260 OH 100,000.00 2,600.00
Sub jumlah 59,540.00
BAHAN :
Kayu Kelas III x 50% 0.0400 m3 #NAME? #NAME?
Paku 0.3000 kg #NAME? #NAME?
Minyak Bekisting 0.1000 ltr 2,500.00 250.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.21 1 M2 BEKISTING UNTUK SLOOF ANALISA PU
UPAH :
1 2 3 4 5 6=(3x5)
Pekerja 0.5200 OH 65,000.00 33,800.00
Tukang 0.2600 OH 80,000.00 20,800.00
Kepala Tukang 0.0260 OH 90,000.00 2,340.00
Mandor 0.0260 OH 100,000.00 2,600.00
Sub jumlah 59,540.00
1 2 3 4 5 6=(3x5)
BAHAN :
Kayu Kelas III x 50% 0.0450 m3 #NAME? #NAME?
Paku 0.3000 kg #NAME? #NAME?
Minyak Bekisting 0.1000 ltr 2,500.00 250.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.22 1 M2 BEKISTING UNTUK KOLOM ANALISA PU
UPAH :
Pekerja 0.6600 OH 65,000.00 42,900.00
Tukang 0.3300 OH 80,000.00 26,400.00
Kepala Tukang 0.0330 OH 90,000.00 2,970.00
Mandor 0.0330 OH 100,000.00 3,300.00
Sub jumlah 75,570.00
BAHAN :
Kayu Kelas III x 50% 0.0400 m3 #NAME? #NAME?
Paku 0.4000 kg #NAME? #NAME?
Minyak Bekisting 0.2000 ltr 2,500.00 500.00
Balok Kayu Kelas III x 50% 0.0150 m3 #NAME? #NAME?
Plywood Tebal 9 mm x 75% 0.3500 lbr 112,500.00 39,375.00
Dolken Kayu x 50% 2.0000 btg 8,750.00 17,500.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.23 1 M2 BEKISTING UNTUK BALOK ANALISA PU
UPAH :
Pekerja 0.6600 OH 65,000.00 42,900.00
Tukang 0.3300 OH 80,000.00 26,400.00
Kepala Tukang 0.0330 OH 90,000.00 2,970.00
Mandor 0.0330 OH 100,000.00 3,300.00
Sub jumlah 75,570.00
BAHAN :
Kayu Kelas III x 50% 0.0400 m3 #NAME? #NAME?
Paku 0.4000 kg #NAME? #NAME?
Minyak Bekisting 0.2000 ltr 2,500.00 500.00
Balok Kayu Kelas III x 50% 0.0180 m3 #NAME? #NAME?
Plywood Tebal 9 mm x 75% 0.3500 lbr 112,500.00 39,375.00
Dolken Kayu x 50% 2.0000 btg 8,750.00 17,500.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.24 1 M2 BEKISTING UNTUK PLAT LANTAI ANALISA PU
UPAH :
Pekerja 0.6600 OH 65,000.00 42,900.00
1 2 3 4 5 6=(3x5)
Tukang 0.3300 OH 80,000.00 26,400.00
Kepala Tukang 0.0330 OH 90,000.00 2,970.00
Mandor 0.0330 OH 100,000.00 3,300.00
Sub jumlah 75,570.00
1 2 3 4 5 6=(3x5)
BAHAN :
Kayu Kelas III x 50% 0.0400 m3 #NAME? #NAME?
Paku 0.4000 kg #NAME? #NAME?
Minyak Bekisting 0.2000 ltr 2,500.00 500.00
Balok Kayu Kelas III x 50% 0.0150 m3 #NAME? #NAME?
Plywood Tebal 9 mm x 75% 0.3500 lbr 112,500.00 39,375.00
Dolken Kayu x 50% 6.0000 btg 8,750.00 52,500.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.25 1 M3 KOLOM BETON PRAKTIS uk. 11/11 K. 175 ANALISA PU
Besi Beton 238.5950 kg #NAME? #NAME?
Adukan Beton Site Mix K. 175 1.0000 m3 #NAME? #NAME?
Bekisting Papan 9.0909 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.26 1 M3 KOLOM BETON uk. 20/20 K. 225 ANALISA PU
Besi Beton 123.5000 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 20.0000 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.27 1 M3 KOLOM BETON uk. 30/40 K. 225 ANALISA PU
Besi Beton 186.0889 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 11.6667 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.28 1 M3 SLOOF BETON uk. 15/20 K. 175 ANALISA PU
Besi Beton 157.5083 kg #NAME? #NAME?
Adukan Beton Site Mix K. 175 1.0000 m³ #NAME? #NAME?
Bekisting Papan 13.3333 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.29 1 M3 SLOOF BETON uk. 20/30 K. 225 ANALISA PU
Besi Beton 145.4750 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 10.0000 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.30 1 M3 RINGBALK BETON uk. 15/20 K. 175 ANALISA PU
Besi Beton 157.5083 kg #NAME? #NAME?
Adukan Beton Site Mix K. 175 1.0000 m³ #NAME? #NAME?
Bekisting Papan 13.3333 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
1 2 3 4 5 6=(3x5)
Jumlah Total #NAME?
Dibulatkan #NAME?
1 2 3 4 5 6=(3x5)
A.31 1 M3 PLAT BETON t = 7 cm K. 225 ANALISA PU
Besi Beton 68.5714 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 14.2857 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.32 1 M3 PLAT BETON t = 10 cm K. 225 ANALISA PU
Besi Beton 96.0000 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 10.0000 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.33 1 M3 PLAT BETON t = 12 cm K. 225 ANALISA PU
Besi Beton 124.0000 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 8.3333 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.34 1 M3 PONDASI PLAT BETON SETEMPAT K. 225 ANALISA PU
Besi Beton 145.6000 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 4.0000 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.35 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps ANALISA PU
UPAH :
Pekerja 0.3000 OH 65,000.00 19,500.00
Tukang Batu 0.1000 OH 80,000.00 8,000.00
Kepala Tukang 0.0100 OH 90,000.00 900.00
Mandor 0.0150 OH 100,000.00 1,500.00
Sub jumlah 29,900.00
BAHAN :
Bata Merah 5 x 11 x 22 cm 70.0000 bh #NAME? #NAME?
Semen Portland 9.6800 kg 1,460.00 14,132.80
Pasir Pasang 0.0450 m³ #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.36 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM + ACIAN ANALISA PU
UPAH :
Pekerja 0.4000 OH 65,000.00 26,000.00
Tukang Batu 0.2000 OH 80,000.00 16,000.00
Kepala Tukang 0.0200 OH 90,000.00 1,800.00
Mandor 0.0220 OH 100,000.00 2,200.00
Sub jumlah 46,000.00
BAHAN :
Semen Portland 6.9120 kg 1,460.00 10,091.52
Pasir Pasang 0.0350 m³ #NAME? #NAME?
1 2 3 4 5 6=(3x5)
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
1 2 3 4 5 6=(3x5)
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.37 1 M2 PASANGAN SIARAN ad. 1 : 2 ANALISA PU
UPAH :
Pekerja 0.3000 OH 65,000.00 19,500.00
Tukang Batu 0.1500 OH 80,000.00 12,000.00
Kepala Tukang 0.0150 OH 90,000.00 1,350.00
Mandor 0.0150 OH 100,000.00 1,500.00
Sub jumlah 34,350.00
BAHAN :
Semen Portland 6.3400 kg 1,460.00 9,256.40
Pasir Pasang 0.0120 m' #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.38 1 M2 PASANGAN ACIAN ANALISA PU
UPAH :
Pekerja 0.2000 OH 65,000.00 13,000.00
Tukang Batu 0.1000 OH 80,000.00 8,000.00
Kepala Tukang 0.0100 OH 90,000.00 900.00
Mandor 0.0100 OH 100,000.00 1,000.00
Sub jumlah 22,900.00
BAHAN :
Semen Portland 3.2500 kg 1,460.00 4,745.00
Sub jumlah 4,745.00
PERALATAN :

Sub jumlah -
Jumlah 27,645.00
Keuntungan Max. 10 % 2,764.50
Jumlah Total 30,409.50
Dibulatkan 30,410.00
A.39 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM ANALISA PU
UPAH :
Pekerja 0.7000 OH 65,000.00 45,500.00
Tukang Batu 0.3500 OH 80,000.00 28,000.00
Kepala Tukang 0.0350 OH 90,000.00 3,150.00
Mandor 0.0350 OH 100,000.00 3,500.00
Sub jumlah 80,150.00
BAHAN :
Keramik 20 x 20 cm 26.5000 bh #NAME? #NAME?
Semen Portland 10.4000 kg 1,460.00 15,184.00
Pasir Pasang 0.0450 m3 #NAME? #NAME?
Semen Warna 1.6200 kg 11,500.00 18,630.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
1 2 3 4 5 6=(3x5)
A.40 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ANALISA PU
UPAH :
Pekerja 0.7000 OH 65,000.00 45,500.00
Tukang Batu 0.3500 OH 80,000.00 28,000.00
Kepala Tukang 0.0350 OH 90,000.00 3,150.00
Mandor 0.0350 OH 100,000.00 3,500.00
Sub jumlah 80,150.00
BAHAN :
Keramik 30 x 30 cm 11.8700 bh #NAME? #NAME?
Semen Portland 10.0000 kg 1,460.00 14,600.00
Pasir Pasang 0.0450 m3 #NAME? #NAME?
Semen Warna 1.5000 kg 11,500.00 17,250.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.41 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
UPAH :
Pekerja 0.7000 OH 65,000.00 45,500.00
Tukang Batu 0.3500 OH 80,000.00 28,000.00
Kepala Tukang 0.0350 OH 90,000.00 3,150.00
Mandor 0.0350 OH 100,000.00 3,500.00
Sub jumlah 80,150.00
BAHAN :
Keramik 40 x 40 cm 1.0000 m2 #NAME? #NAME?
Semen Portland 10.0000 kg 1,460.00 14,600.00
Pasir Pasang 0.0450 m3 #NAME? #NAME?
Semen Warna 1.5000 kg 11,000.00 16,500.00
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.42 1 M2 PASANG DINDING KERAMIK 20 X 25 CM, S
UPAH : N
I
Pekerja 0.7000 OH 65,000.00 45,500.00 .
Tukang Batu 0.3500 OH 80,000.00 28,000.00 D
T
Kepala Tukang 0.0350 OH 90,000.00 3,150.00
Mandor 0.0350 OH 100,000.00 3,500.00 9
Sub jumlah 80,150.00 1
-
BAHAN : 0
Keramik 20 x 25 cm 20.0000 bh 3,500.00 70,000.00 0
1
Semen Portland 10.4000 kg 1,460.00 15,184.00
2
Pasir Pasang 0.0450 m3 #NAME? #NAME? -
Semen Warna 1.6200 kg 11,500.00 18,630.00 2
0
Sub jumlah #NAME? 0
PERALATAN : 7
.
6
.
Sub jumlah - 3
6
Jumlah #NAME?
.
Keuntungan Max. 10 % #NAME? 1
Jumlah Total #NAME?
1 2 3 4 5 6=(3x5)
Dibulatkan #NAME?
A.43 1 M2 PASANGAN PAVING BLOCK WARNA T = 6 CM SNI.DT 91-0012-2007.
UPAH :
Pekerja 0.3000 OH 65,000.00 19,500.00
Tukang Batu 0.2000 OH 80,000.00 16,000.00
Kepala Tukang Batu 0.0100 OH 90,000.00 900.00
Mandor 0.0100 OH 100,000.00 1,000.00
Sub jumlah 37,400.00
BAHAN :
Paving Block Warna 6 cm 1.0000 m2 #NAME? #NAME?
Pasir Urug 0.0550 m³ #NAME? #NAME?
Sub jumlah #NAME?
1 2 3 4 5 6=(3x5)
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.44 1 M2 PASANG DINDING BATU TEMPEL ANALISA PU
UPAH :
Pekerja 0.7000 OH 65,000.00 45,500.00
Tukang Batu 0.3500 OH 80,000.00 28,000.00
Kepala Tukang 0.0350 OH 90,000.00 3,150.00
Mandor 0.0350 OH 100,000.00 3,500.00
Sub jumlah 80,150.00
BAHAN :
Batu Tempel Hitam 1.1000 m2 #NAME? #NAME?
Semen Abu-abu 11.7500 kg 1,460.00 17,155.00
Pasir Pasang 0.0350 m3 #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.45 1 M1 PASANG LISTPLANK GRC 20 CM
UPAH :
Pekerja 0.1000 OH 65,000.00 6,500.00
Tukang Kayu 0.2000 OH 80,000.00 16,000.00
Kepala Tukang 0.0200 OH 90,000.00 1,800.00
Mandor 0.0050 OH 100,000.00 500.00
Sub jumlah 24,800.00
BAHAN :
Listplank GRC 1.0000 m' 15,000.00 15,000.00
Paku Biasa 2" - 5" 0.0500 kg #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.46 MEMASANG 1 BUAH BAK KONTROL PAS. BATU BATA (30X30) TINGGI 35 CM ANALISA PU
UPAH :
Pekerja 2.1600 OH 65,000.00 140,400.00
Tukang Batu 0.7200 OH 80,000.00 57,600.00
Kepala Tukang 0.0720 OH 90,000.00 6,480.00
Mandor 0.0110 OH 100,000.00 1,100.00
Sub jumlah 205,580.00
BAHAN :
Batu Bata 40.0000 bh #NAME? #NAME?
Semen Portland 44.0000 kg 1,460.00 64,240.00
Pasir Pasang 0.0700 m3 #NAME? #NAME?
Batu Kerikil 0.0700 m3 #NAME? #NAME?
Besi beton 1.6000 kg #NAME? #NAME?
Pasir Beton 0.0600 m3 #NAME? #NAME?
Sub jumlah #NAME?
1 2 3 4 5 6=(3x5)
PERALATAN :

Sub jumlah -
1 2 3 4 5 6=(3x5)
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.47 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5" ANALISA PU
UPAH :
Pekerja 0.0360 OH 65,000.00 2,340.00
Tukang Batu 0.0600 OH 80,000.00 4,800.00
Kepala Tukang 0.0060 OH 90,000.00 540.00
Mandor 0.0020 OH 100,000.00 200.00
Sub jumlah 7,880.00
BAHAN :
Pipa PVC 1.2000 m' #NAME? #NAME?
Perlengkapan 0.3500 hrg pipa #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.48 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2" ( ABU ) ANALISA PU
UPAH :
Pekerja 0.0540 OH 65,000.00 3,510.00
Tukang Batu 0.0900 OH 80,000.00 7,200.00
Kepala Tukang 0.0090 OH 90,000.00 810.00
Mandor 0.0030 OH 100,000.00 300.00
Sub jumlah 11,820.00
BAHAN :
Pipa PVC 1.2000 m' 14,166.67 17,000.00
Perlengkapan 0.3500 hrg pipa 14,166.67 4,958.33
Sub jumlah 21,958.33
PERALATAN :

Sub jumlah -
Jumlah 33,778.33
Keuntungan Max. 10 % 3,377.83
Jumlah Total 37,156.17
Dibulatkan 37,156.00
A.49 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" ANALISA PU
UPAH :
Pekerja 0.0100 OH 65,000.00 650.00
Tukang Batu 0.4000 OH 80,000.00 32,000.00
Kepala Tukang 0.0400 OH 90,000.00 3,600.00
Mandor 0.0050 OH 100,000.00 500.00
Sub jumlah 36,750.00
BAHAN :
Kran Air 1.0000 bh 85,000.00 85,000.00
Seal tape 0.0250 bh 3,000.00 75.00
Sub jumlah 85,075.00
PERALATAN :

Sub jumlah -
Jumlah 121,825.00
Keuntungan Max. 10 % 12,182.50
Jumlah Total 134,007.50
Dibulatkan 134,008.00
A.50 MEMASANG 1 BH FLOOR DRAIN ANALISA PU
1 2 3 4 5 6=(3x5)
UPAH :
Pekerja 0.0100 OH 65,000.00 650.00
Tukang Batu 0.1000 OH 80,000.00 8,000.00
Kepala Tukang 0.0100 OH 90,000.00 900.00
Mandor 0.0050 OH 100,000.00 500.00
Sub jumlah 10,050.00
1 2 3 4 5 6=(3x5)
BAHAN :
Floordrain 1.0000 bh 90,000.00 90,000.00

Sub jumlah 90,000.00


PERALATAN :

Sub jumlah -
Jumlah 100,050.00
Keuntungan Max. 10 % 10,005.00
Jumlah Total 110,055.00
Dibulatkan 110,055.00
A.51 1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN
Galian Tanah 0.2000 m³ 51,250.00 10,250.00
Grefel Beton 30 Cm X 1/2 1.0000 bh 65,000.00 65,000.00
Pas . Bata + Plesteran 1 : 3 1.0000 m1 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.52 1 M1 SALURAN L = 40 CM + PLAT DECKER
Galian Tanah 1.2000 m³ 51,250.00 61,500.00
Pas. Batu Belah 0.7600 m³ #NAME? #NAME?
Pek. Siaran 1.6000 m2 #NAME? #NAME?
Adukan Beton K 225 0.0900 m³ #NAME? #NAME?
Besi beton 11.1600 kg #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.53 1 KG PEKERJAAN BAJA IWF EX DN ANALISA PU
UPAH :
Pekerja Terampil 0.0600 OH 65,000.00 3,900.00
Tukang besi 0.0600 OH 80,000.00 4,800.00
Kepala tukang 0.0060 OH 90,000.00 540.00
Mandor 0.0030 OH 100,000.00 300.00
Sub jumlah 9,540.00
BAHAN :
Besi IWF ex DN SII 1.1500 kg 10,250.00 11,787.50
Zincromate 1.0000 ls 1,178.75 1,178.75
Sub jumlah 12,966.25
PERALATAN :

Sub jumlah -
Jumlah 22,506.25
Keuntungan Max. 10 % 2,250.63
Jumlah Total 24,756.88
Dibulatkan 24,757.00
A.54 100 KG PEKERJAAN PERAKITAN BAJA ANALISA PU
UPAH :
Pekerja Terampil 0.1000 OH 65,000.00 6,500.00
Tukang besi 0.1000 OH 80,000.00 8,000.00
Kepala tukang 0.0010 OH 90,000.00 90.00
Mandor 0.0050 OH 100,000.00 500.00
Sub jumlah 15,090.00
BAHAN :
Solar 1.0000 ltr 7,000.00 7,000.00
Minyak Pelumas 0.1000 ltr 41,000.00 4,100.00
Sub jumlah 11,100.00
PERALATAN :
Sewa Alat 0.8000 jam 155,000.00 124,000.00
1 2 3 4 5 6=(3x5)

Sub jumlah 124,000.00


Jumlah 150,190.00
Keuntungan Max. 10 % 15,019.00
Jumlah Total 165,209.00
Dibulatkan 165,209.00
1 2 3 4 5 6=(3x5)
A.55 1 M2 PENGECATAN DINDING/PLAFOND BARU ( 1 PLAMUR, 2 CAT DASAR, 2 CAT PENUTUP)
UPAH :
Pekerja 0.0200 OH 65,000.00 1,300.00
Tukang 0.0630 OH 80,000.00 5,040.00
Kepala Tukang 0.0063 OH 90,000.00 567.00
Mandor 0.0030 OH 100,000.00 300.00
Sub jumlah 7,207.00
BAHAN :
Plamir tembok 0.1000 kg #NAME? #NAME?
Cat Dasar 0.1000 kg 52,000.00 5,200.00
Cat Penutup 0.2600 kg #NAME? #NAME?
Sub jumlah #NAME?

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.56 1 M2 PENGECATAN BIDANG KAYU BARU (1 PLAMUR, 1 CAT DASAR, 2 CAT PENUTUP)
UPAH :
Pekerja 0.0700 OH 65,000.00 4,550.00
Tukang 0.0090 OH 80,000.00 720.00
Kepala Tukang 0.0060 OH 90,000.00 540.00
Mandor 0.0030 OH 100,000.00 300.00
Sub jumlah 6,110.00
BAHAN :
Meni kayu 0.2000 kg #NAME? #NAME?
Plamir kayu 0.1500 kg 14,000.00 2,100.00
Cat Dasar 0.1700 kg 52,000.00 8,840.00
Cat Penutup 0.2600 kg #NAME? #NAME?
Amplas kayu 0.2000 lbr #NAME? #NAME?
Minyak cat terpentin 0.0300 ltr #NAME? #NAME?
Kwas 3" 0.0100 bh #NAME? #NAME?
Sub jumlah #NAME?

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.57 1 M2 PENGECATAN BESI
UPAH :
Pekerja 0.0700 OH 65,000.00 4,550.00
Tukang 0.0090 OH 80,000.00 720.00
Kepala Tukang 0.0060 OH 90,000.00 540.00
Mandor 0.0030 OH 100,000.00 300.00
Sub jumlah 6,110.00
BAHAN :
Meni 0.2000 kg #NAME? #NAME?
Cat Penutup 0.2600 kg #NAME? #NAME?
Amplas 0.2000 lbr #NAME? #NAME?
Tiner 0.0300 ltr 23,000.00 690.00
Kwas 3" 0.0100 bh #NAME? #NAME?
Sub jumlah #NAME?

Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
1 2 3 4 5 6=(3x5)
Dibulatkan #NAME?
1 2 3 4 5 6=(3x5)
A.58 1 BUAH LAMPU TL 40 Watt (LENGKAP)
BAHAN :
Lampu TL (Lengkap) 1.0000 bh 125,000.00 125,000.00
Sub jumlah 125,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
Jumlah 141,000.00
Keuntungan Max. 10 % 14,100.00
Jumlah Total 155,100.00
Dibulatkan 155,100.00
A.59 1 BUAH LAMPU DOWN LIGHT
BAHAN :
Lampu Down Light (lengkap) 1.0000 bh 145,000.00 145,000.00
Sub jumlah 145,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
Jumlah 161,000.00
Keuntungan Max. 10 % 16,100.00
Jumlah Total 177,100.00
Dibulatkan 177,100.00
A.60 1 BUAH LAMPU SL
BAHAN :
Lampu SL (lengkap) 1.0000 bh 40,000.00 40,000.00
Sub jumlah 40,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
Jumlah 56,000.00
Keuntungan Max. 10 % 5,600.00
Jumlah Total 61,600.00
Dibulatkan 61,600.00
A.61 1 BUAH LAMPU BARET
BAHAN :
Lampu Baret 24 Watt (Lengkap) 1.0000 bh 400,000.00 400,000.00
Sub jumlah 400,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
Jumlah 416,000.00
Keuntungan Max. 10 % 41,600.00
Jumlah Total 457,600.00
Dibulatkan 457,600.00
A.62 1 BUAH STOP KONTAK
BAHAN :
Stop Kontak 1.0000 bh 30,000.00 30,000.00
Sub jumlah 30,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
Jumlah 46,000.00
Keuntungan Max. 10 % 4,600.00
Jumlah Total 50,600.00
Dibulatkan 50,600.00
A.63 1 BUAH SAKLAR
BAHAN :
Saklar 1.0000 bh 30,000.00 30,000.00
Sub jumlah 30,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
1 2 3 4 5 6=(3x5)
Jumlah 46,000.00
Keuntungan Max. 10 % 4,600.00
Jumlah Total 50,600.00
Dibulatkan 50,600.00
ANALISA HARGA SATUAN
PEKERJAAN PINTU DAN JENDELA

Harga Satuan Jumlah Harga


No. Jenis Pekerjaan Satuan Volume
(Rp) (Rp)

1 PG 1 Unit
Spesifikasi sebagai berikut :
a. Ukuran : 230x265 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 18.200 #REF! #REF!
c. Daun Pintu : -
Pintu Kaca Rangka Alumunium m2 2.940 #REF! #REF!
d. Daun Jendela : -
Kaca Polos 5 mm Rangka Aluminium m2 1.330 450,000.00 598,500.00
e. Kaca -
Kaca Polos 5 mm m2 0.880 #REF! #REF!
f. Handle : -
Pull Handle ex. Dekkson PH D 855 19X152 AB psg 2.000 400,000.00 800,000.00
Casement Handle ex. Dekkson-CH-428-NLOCK-RNA bh 2.000 35,000.00 70,000.00
f. Kunci : -
Lockcase ex. Dekkson-MTS-L-DKS-8485-RL SN +DC-60mm-SN set 1.00 300,000.00 300,000.00
g. Penggantung : -
Engsel ex. Dekkson-ES-S/S-DL-4'X3'X3MM-2BB psg 3.00 145,000.00 435,000.00
Friction Stay ex. Dekkson-FS-DEK-10" psg 2.00 95,000.00 190,000.00
h. Aksesoris : -
Door Stoper ex. Dekkson DKS-886-SN bh 2.00 45,000.00 90,000.00
i. Penguat Engsel : Kayu Kamper 50/70 (setinggi pintu) m3 0.02 #REF! #REF!
TOTAL HARGA SATUAN PG #REF!

A.141 PAS. PINTU P1 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 150x265 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 10.200 #REF! #REF!
c. Daun Pintu : -
Daun Pintu Kaca Rangka Alumunium m2 2.940 #REF! #REF!
d. Finishing Daun Pintu : -
Politur m2 24,229.00 -
e. Kaca -
Kaca 5 mm m2 0.580 131,274.00 76,138.92
h. Aksesoris : -
Kunci 2 Slaag bh 1.00 175,824.00 175,824.00
Handle Pintu psg 2.00 #REF! #REF!
Engsel ex. Dekkson-ES-S/S-DL-4'X3'X3MM-2BB psg 3.00 #REF! #REF!
i. Penguat Engsel : Kayu Kamper 50/70 (setinggi pintu) m3 0.02 #REF! #REF!
TOTAL HARGA SATUAN PAS. PINTU P1 #REF!

A.142 PAS. PINTU P2 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 130x265 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 8.800 #REF! #REF!
c. Daun Pintu : -
Daun Pintu Kaca Rangka Alumunium m2 2.520 #REF! #REF!
d. Daun Jendela -
Kaca Polos 5 mm Rangka Aluminium m2 0.48 450,000.00 216,000.00
e. Kaca -
Kaca 5 mm m2 131,274.00 -
h. Aksesoris : -
Kunci 2 Slaag bh 1.00 175,824.00 175,824.00
Handle Pintu psg 2.00 #REF! #REF!
Engsel ex. Dekkson-ES-S/S-DL-4'X3'X3MM-2BB psg 3.00 #REF! #REF!
i. Penguat Engsel : Kayu Kamper 50/70 (setinggi pintu) m3 0.02 #REF! #REF!
TOTAL HARGA SATUAN PAS. PINTU P2 #REF!

A.143 PAS. PINTU P3 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 90x265 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 7.900 #REF! #REF!
c. Daun Pintu : -
Daun Pintu Kaca Rangka Alumunium m2 1.680 #REF! #REF!
d. Daun Jendela -
Kaca Polos 5 mm Rangka Aluminium m2 0.45 450,000.00 202,500.00
e. Kaca -
Kaca 5 mm m2 1.080 131,274.00 141,775.92
h. Aksesoris : -
Kunci 2 Slaag bh 1.00 175,824.00 175,824.00
Engsel ex. Dekkson-ES-S/S-DL-4'X3'X3MM-2BB psg 1.50 #REF! #REF!
i. Penguat Engsel : Kayu Kamper 50/70 (setinggi pintu) m3 0.02 #REF! #REF!
TOTAL HARGA SATUAN PAS. PINTU P3 #REF!
Harga Satuan Jumlah Harga
No. Jenis Pekerjaan Satuan Volume
(Rp) (Rp)

A.143 PAS. PINTU P4 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 80x265 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 7.600 #REF! #REF!
c. Daun Pintu : -
Daun Pintu Double Teakwood m2 1.680 #REF! #REF!
d. Finishing Daun Pintu -
Cat Politur m2 3.36 #REF! #REF!
e. Kaca -
Kaca 5 mm m2 0.320 131,274.00 42,007.68
h. Aksesoris : -
Kunci 2 Slaag bh 1.00 175,824.00 175,824.00
Engsel ex. Dekkson-ES-S/S-DL-4'X3'X3MM-2BB psg 1.50 #REF! #REF!
i. Penguat Engsel : Kayu Kamper 50/70 (setinggi pintu) m3 0.02 #REF! #REF!
TOTAL HARGA SATUAN PAS. PINTU P4 #REF!

A.143 PAS. PINTU P5 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 80x210 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 5.000 #REF! #REF!
c. Daun Pintu : -
Daun Pintu Double Teakwood m2 1.680 #REF! #REF!
d. Finishing Daun Pintu -
Cat Politur m2 3.36 #REF! #REF!
e. Kaca -
Kaca 5 mm m2 - -
h. Aksesoris : -
Kunci 2 Slaag bh 1.00 175,824.00 175,824.00
Engsel ex. Dekkson-ES-S/S-DL-4'X3'X3MM-2BB psg 1.50 #REF! #REF!
i. Penguat Engsel : Kayu Kamper 50/70 (setinggi pintu) m3 0.02 #REF! #REF!
TOTAL HARGA SATUAN PAS. PINTU P5 #REF!

A.144 PAS. JENDELA J2 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 135 x155 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 11.55 #REF! #REF!
c. Daun Jendela : -
Kaca Polos 5 mm Rangka Aluminium m2 1.68 450,000.00 756,000.00
d. Kaca
Kaca Mati Polos 5 mm ex.Asahimas m2 -
e. Handle : -
Casement Handle ex. Dekkson-CH-428-NLOCK-RNA bh 4.00 35,000.00 140,000.00
f Penggantung : -
Friction Stay ex. Dekkson-FS-DEK-10" psg 4.00 95,000.00 380,000.00
TOTAL HARGA SATUAN PAS. JENDELA J2 #REF!

A.145 PAS. JENDELA J3 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 200x155 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 14.40 #REF! #REF!
c. Daun Jendela : -
Kaca Polos 5 mm Rangka Aluminium m2 1.68 450,000.00 756,000.00
d. Kaca :
Kaca Mati Polos 5 mm ex.Asahimas m2 0.84 131,274.00 110,270.16
e. Handle : -
Casement Handle ex. Dekkson-CH-428-NLOCK-RNA bh 4.00 35,000.00 140,000.00
f. Penggantung : -
Friction Stay ex. Dekkson-FS-DEK-10" psg 4.00 95,000.00 380,000.00
TOTAL HARGA SATUAN PAS. JENDELA J3 #REF!

A.146 PAS. JENDELA J4 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 135 x 110 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 5.70 #REF! #REF!
c. Daun Jendela : -
Kaca Polos 5 mm m2 0.95 #REF! #REF!
d. Handle : -
Casement Handle ex. Dekkson-CH-428-NLOCK-RNA bh -
e. Penggantung : -
Friction Stay ex. Dekkson-FS-DEK-10" psg -
TOTAL HARGA SATUAN PAS. JENDELA J4 #REF!

A.148 PAS. JENDELA BV 1 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 70x50 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 2.40 #REF! #REF!
c. Daun Jendela : -
Kaca Polos 5 mm m2 0.35 #REF! #REF!
d. Handle : -
Casement Handle ex. Dekkson-CH-428-NLOCK-RNA bh 35,000.00 -
e. Penggantung : -
Friction Stay ex. Dekkson-FS-DEK-10" psg 95,000.00 -
TOTAL HARGA SATUAN PAS. JENDELA BV 1 #REF!

A.148 PAS. JENDELA BV 2 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 115x50 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 3.80 #REF! #REF!
c. Daun Jendela : -
Kaca Polos 5 mm m2 0.50 #REF! #REF!
d. Handle : -
Casement Handle ex. Dekkson-CH-428-NLOCK-RNA bh - -
e. Penggantung : -
Friction Stay ex. Dekkson-FS-DEK-10" psg - -
TOTAL HARGA SATUAN PAS. JENDELA BV 2 #REF!

A.148 PAS. JENDELA BV 3 1 Unit


Spesifikasi sebagai berikut :
a. Ukuran : 200x50 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 6.00 #REF! #REF!
c. Daun Jendela : -
Kaca Polos 5 mm m2 0.90 #REF! #REF!
d. Handle : -
Casement Handle ex. Dekkson-CH-428-NLOCK-RNA bh - -
e. Penggantung : -
Friction Stay ex. Dekkson-FS-DEK-10" psg - -
TOTAL HARGA SATUAN PAS. JENDELA BV 3 #REF!
DAFTAR HARGA SATUAN PEKERJAAN

NO. URAIAN JUMLAH

1 2 3

1 A.01 1 M2 PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M Rp. #NAME?
2 A.02 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK Rp. #NAME?
3 A.03 1 M2 PEMBUATAN GUDANG SEMEN DAN PERALATAN Rp. #NAME?
4 A.04 1 M2 PEMBERSIHAN LAPANGAN DAN PERATAAN Rp. 12,650.00
5 A.05 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M Rp. 56,375.00
6 A.06 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M Rp. 69,300.00
7 A.07 1 M2 PEKERJAAN STRIPING TANAH Rp. 4,125.00
8 A.08 1 M3 URUGAN TANAH KEMBALI Rp. 41,250.00
9 A.09 1 M3 MEMADATKAN TANAH ( PER 20 CM) Rp. 41,250.00
10 A.10 1 M3 URUGAN PASIR URUG Rp. #NAME?
11 A.11 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps Rp. #NAME?
12 A.12 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps Rp. #NAME?
13 A.13 1 M3 PASANG AANSTAMPING BATU KOSONG Rp. #NAME?
14 A.14 1 M3 MEMBUAT ADUKAN LANTAI KERJA f'c = 7.4 Mpa (K 100) Rp. #NAME?
15 A.15 1 M3 MEMBUAT ADUKAN BETON f'c = 7.4 Mpa (K 100) Rp. #NAME?
16 A.16 1 M3 MEMBUAT ADUKAN BETON f'c = 14.5 Mpa (K 175) Rp. #NAME?
17 A.17 1 M3 MEMBUAT ADUKAN BETON f'c = 19.3 Mpa (K 225) Rp. #NAME?
18 A.18 1 M3 MEMBUAT ADUKAN BETON f'c = 21.7 Mpa (K 250) Rp. #NAME?
19 A.19 10 Kg BESI BETON TERPASANG Rp. #NAME?
20 A.20 1 M2 BEKISTING UNTUK PONDASI Rp. #NAME?
21 A.21 1 M2 BEKISTING UNTUK SLOOF Rp. #NAME?
22 A.22 1 M2 BEKISTING UNTUK KOLOM Rp. #NAME?
23 A.23 1 M2 BEKISTING UNTUK BALOK Rp. #NAME?
24 A.24 1 M2 BEKISTING UNTUK PLAT LANTAI Rp. #NAME?
25 A.25 1 M3 KOLOM BETON PRAKTIS uk. 11/11 K. 175 Rp. #NAME?
26 A.26 1 M3 KOLOM BETON uk. 20/20 K. 225 Rp. #NAME?
27 A.27 1 M3 KOLOM BETON uk. 30/40 K. 225 Rp. #NAME?
28 A.28 1 M3 SLOOF BETON uk. 15/20 K. 175 Rp. #NAME?
29 A.29 1 M3 SLOOF BETON uk. 20/30 K. 225 Rp. #NAME?
30 A.30 1 M3 RINGBALK BETON uk. 15/20 K. 175 Rp. #NAME?
31 A.31 1 M3 PLAT BETON t = 7 cm K. 225 Rp. #NAME?
32 A.32 1 M3 PLAT BETON t = 10 cm K. 225 Rp. #NAME?
33 A.33 1 M3 PLAT BETON t = 12 cm K. 225 Rp. #NAME?
34 A.34 1 M3 PONDASI PLAT BETON SETEMPAT K. 225 Rp. #NAME?
35 A.35 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps Rp. #NAME?
36 A.36 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM + ACIAN Rp. #NAME?
37 A.37 1 M2 PASANGAN SIARAN ad. 1 : 2 Rp. #NAME?
38 A.38 1 M2 PASANGAN ACIAN Rp. 30,410.00
NO. URAIAN JUMLAH
1 2 3
39 A.39 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM Rp. #NAME?
40 A.40 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM Rp. #NAME?
41 A.41 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM Rp. #NAME?
NO. URAIAN JUMLAH
1 2 3
42 A.42 1 M2 PASANG DINDING KERAMIK 20 X 25 CM, Rp. #NAME?
43 A.43 1 M2 PASANGAN PAVING BLOCK WARNA T = 6 CM Rp. #NAME?
44 A.44 1 M2 PASANG DINDING BATU TEMPEL Rp. #NAME?
45 A.45 1 M1 PASANG LISTPLANK GRC 20 CM Rp. #NAME?
46 A.46 MEMASANG 1 BUAH BAK KONTROL PAS. BATU BATA (30X30) TINGGI 35 CM Rp. #NAME?
47 A.47 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5" Rp. #NAME?
48 A.48 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2" ( ABU ) Rp. 37,156.00
49 A.49 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" Rp. 134,008.00
50 A.50 MEMASANG 1 BH FLOOR DRAIN Rp. 110,055.00
51 A.51 1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN Rp. #NAME?
52 A.52 1 M1 SALURAN L = 40 CM + PLAT DECKER Rp. #NAME?
53 A.53 1 KG PEKERJAAN BAJA IWF EX DN Rp. 24,757.00
54 A.54 100 KG PEKERJAAN PERAKITAN BAJA Rp. 165,209.00
55 A.55 1 M2 PENGECATAN DINDING/PLAFOND BARU ( 1 PLAMUR, 2 CAT DASAR, 2 CAT PENUTUP) Rp. #NAME?
56 A.56 1 M2 PENGECATAN BIDANG KAYU BARU (1 PLAMUR, 1 CAT DASAR, 2 CAT PENUTUP) Rp. #NAME?
57 A.60 1 M2 PENGECATAN BESI Rp. #NAME?
58 A.58 1 BUAH LAMPU TL 40 Watt (LENGKAP) Rp. 155,100.00
59 A.59 1 BUAH LAMPU DOWN LIGHT Rp. 177,100.00
60 A.60 1 BUAH LAMPU SL Rp. 61,600.00
61 A.61 1 BUAH LAMPU BARET Rp. 457,600.00
62 A.62 1 BUAH STOP KONTAK Rp. 50,600.00
63 A.63 1 BUAH SAKLAR Rp. 50,600.00
RENCANA ANGGARAN BIAYA
KEGIATAN : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA
PUSKESMAS/PUSTU DAN JARINGANNYA
PEKERJAAN : PEMBANGUNAN PUSKESMAS AGRABINTA KECAMATAN AGRABINTA
SATKER : DINAS KESEHATAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016

HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' 76.00 #NAME? #NAME?
2 Pembuatan Papan Nama proyek ls 1.00 300,000.00 300,000.00
3 Sewa Direksikeet ls 1.00 2,000,000.00 2,000,000.00
4 Administrasi, Perijinan IMB dan Dokumentasi ls 1.00 1,000,000.00 1,000,000.00
5 Bongkaran ls 1.00 2,000,000.00 2,000,000.00
Sub Jumlah #NAME?
B PEKERJAAN LANTAI I
I PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 68.41 56,375.00 3,856,613.75
2 Pek. Galian Tanah untuk pondasi maks. 2 m m3 109.44 69,300.00 7,584,192.00
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 77.68 41,250.00 3,204,258.75
4 Pek. Urugan Tanah dibawah lantai dipadatkan m3 71.40 41,250.00 2,945,250.00
5 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 17.25 #NAME? #NAME?
Sub Jumlah #NAME?
II PEKERJAAN TEMBOKAN
1 Pas. Aanstamping m3 9.75 #NAME? #NAME?
2 Pek. Pondasi Batu Belah ad 1:5 m3 28.60 #NAME? #NAME?
3 Pek. Pondasi Foot Plat m3 16.56 #NAME? #NAME?
4 Pek. Sloof Beton 15/20 m3 3.38 #NAME? #NAME?
5 Pek. Sloof Beton 20/30 m3 5.55 #REF! #REF!
6 Pek. Kolom Praktis 12/12 m3 1.07 #NAME? #NAME?
7 Pas. Kolom 20/20 m3 0.89 #NAME? #NAME?
8 Pas. Kolom 30/30 m3 10.66 #NAME? #NAME?
9 Pas. Balok Beton 20/40 m3 7.04 #REF! #REF!
10 Pas. Balok Beton 15/30 m3 9.02 #REF! #REF!
11 Pek. Plat Lantai Beton t = 12 cm m3 26.28 #NAME? #NAME?
12 Pek. Dak Beton t = 10 cm m3 6.30 #NAME? #NAME?
13 Pek. Listplank Beton t = 5 cm m3 0.48 #NAME? #NAME?
14 Pek. Topi Beton m3 0.56 #NAME? #NAME?
15 Pek. Plat Tangga Beton m3 1.89 #NAME? #NAME?
16 Pek. Meja Beton m3 0.42 #NAME? #NAME?
17 Pek. Balok Lintel 12/15 m3 0.80 #REF! #REF!
18 Pek. Dinding Bata m2 616.27 #NAME? #NAME?
19 Pek. Plesteran + Acian 1 : 5 m2 1,232.54 #NAME? #NAME?
20 Pek. Lantai Rabat Beton ad 1:3:5 + acian m3 2.71 #NAME? #NAME?
21 Pas. Lantai Keramik uk 20 x 20 cm DN m2 13.50 #NAME? #NAME?
22 Pas. Lantai Keramik uk 40 x 40 cm DN m2 268.50 #NAME? #NAME?
23 Pas. Dinding Keramik uk 20 x 25 cm DN m2 73.95 #NAME? #NAME?
Sub Jumlah #NAME?
III PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Besi Hollow Galvanis m2 268.00 #REF! #REF!
2 Pas. Plafond Gypsum 9 mm m2 243.00 #REF! #REF!
3 Pas. Plafond GRC 4 mm m2 25.00 #REF! #REF!
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
4 Pek. List Plafond Gypsum (Plafond Gypsum ) m1 433.00 #REF! #REF!
5 Pek. List Plafond Kayu (Plafond GRC ) m1 81.00 #REF! #REF!
Sub Jumlah #REF!
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
IV PEKERJAAN ALUMUNIUM
1 Pas. Pintu type PG1, Alumuium 4" Silver unit 1.00 #REF! #REF!
2 Pas. Pintu type P1, Alumuium 4" Silver unit 2.00 #REF! #REF!
3 Pas. Pintu type P2, Alumuium 4" Silver unit 13.00 #REF! #REF!
4 Pas. Pintu type P3, Alumuium 4" Silver unit 5.00 #REF! #REF!
5 Pas. Pintu type P4, Alumuium 4" Silver unit - #REF! #REF!
6 Pas. Pintu type P5, Alumuium 4" Silver unit #REF!
7 Pas. Jendela type J2, Alumuium 4" Silver unit 11.00 #REF! #REF!
8 Pas. Jendela type J3, Alumuium 4" Silver unit #REF!
9 Pas. Jendela type J4, Alumuium 4" Silver unit 1.00 #REF! #REF!
10 Pas. Bouvenlight BV1, Alumunium 4" Silver unit 3.00 #REF! #REF!
11 Pas. Bouvenlight BV2, Alumunium 4" Silver unit 3.00 #REF! #REF!
12 Pas. Bouvenlight BV3, Alumunium 4" Silver unit #REF!
Sub Jumlah #REF!
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 1,232.54 #NAME? #NAME?
2 Pek. Pengecatan Plafond 3x m2 293.00 #NAME? #NAME?
Sub Jumlah #NAME?
VI PEKERJAAN SANITARY
1 Pas. Closet Jongkok bh 5.00 #REF! #REF!
2 Pas. Floor Drain Stainles bh 5.00 #REF! #REF!
3 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh 3.00 #REF! #REF!
4 Pas. Kran Air dia. 1/2" bh 5.00 #REF! #REF!
5 Pas. Tempat Sabun Keramik bh 3.00 65,450.00 196,350.00
6 Pas. Wastafel lengkap bh 8.00 #REF! #REF!
7 Pas. Spoel Hook , sek TOTO ( lengkap assesories ) unit 1.00 10,000,000.00 10,000,000.00
8 Pas. Sumur bor + Pompa unit 1.00 11,250,000.00 11,250,000.00
9 Pek. Rumah Pompa lengkap aksesoris unit 1.00 1,000,000.00 1,000,000.00
10 Pek. Septiktank uk. 1.5 x 1 x 1.5 m unit 2.00 4,571,636.00 9,143,272.00
- bangunan septiktank
- valve, fitting & aksesoris
- pemipaan septiktank & bidang resapan
- galian & urugan
- bak kontrol

Sub Jumlah #REF!


VII PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk 31.00 170,000.00 5,270,000.00
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk 15.00 170,000.00 2,550,000.00
3 Pas. Lampu TL 20 watt + aksesoris Philips bh 15.00 155,100.00 2,326,500.00
4 Pas. Lampu Baret Kotak 20 watt aksesoris Philips bh 3.00 457,600.00 1,372,800.00
5 Pas. Lampu SL bh 13.00 61,600.00 800,800.00
6 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh 15.00 50,600.00 759,000.00
7 Pas. Saklar Ganda , sek. Broco bh 3.00 50,600.00 151,800.00
8 Pas. Saklar Tunggal, sek. Broco bh 15.00 50,600.00 759,000.00
9 Pas. Box MCB + MCB 6 Group bh 1.00 650,000.00 650,000.00
10 Biaya penyambungan listrik (BP) ke PLN 6.5 KVA ls 1.00 5,000,000.00 5,000,000.00
Sub Jumlah 19,639,900.00
VIII PEKERJAAN PLUMBING
a. Pekerjaan Pipa Air Bersih
1 Pas. Pipa PVC AW dia. 1" sek. Maspion m' 18.00 #REF! #REF!
2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' 18.00 #REF! #REF!
3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' 36.00 #REF! #REF!
b. Pekerjaan Pipa Air bekas , Air kotor & vent
1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' 24.00 #REF! #REF!
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
2 Pas. Pipa PVC AW dia. 3" sek. Maspion m' 24.00 #REF! #REF!
3 Pas. Pipa PVC AW dia. 2" sek. Maspion m' 16.00 #REF! #REF!
Sub Jumlah #REF!
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
C PEKERJAAN LANTAI II ###
I PEKERJAAN TEMBOKAN
1 Pek. Kolom Praktis 12/12 m3 0.91 #NAME? #NAME?
2 Pas. Kolom 30/30 m3 6.30 #NAME? #NAME?
3 Pek. Plat Lantai Beton m3 0.72 #NAME? #NAME?
4 Pek. Balok/Ringbalk beton bertulang 15/20 m3 3.51 #NAME? #NAME?
5 Pek. Meja Beton m3 0.08 #NAME? #NAME?
6 Pek. Balok Lintel 12/15 m3 0.60 #REF! #REF!
7 Pek. Dinding Bata m2 434.34 #NAME? #NAME?
8 Pek. Plesteran + Acian 1 : 5 m 840.78 #NAME? #NAME?
9 Pas. Lantai Keramik uk 20 x 20 cm DN m2 9.00 #NAME? #NAME?
10 Pas. Lantai Keramik uk 40 x 40 cm DN m2 210.00 #NAME? #NAME?
11 Pas. Dinding Keramik uk 20 x 25 cm DN m2 27.90 #NAME? #NAME?
Sub Jumlah #NAME?
II PEKERJAAN PLAFOND ###
1 Pek. Rangka Plafond Besi Hollow Galvanis m2 303.00 #REF! #REF!
2 Pas. Plafond Gypsum 9 mm m2 231.00 #REF! #REF!
3 Pas. Plafond GRC 4 mm m2 72.00 #REF! #REF!
4 Pek. List Plafond Gypsum (Plafond Gypsum ) m' 205.00 #REF! #REF!
5 Pek. List Plafond Kayu ( Plafond GRC ) m' 128.00 #REF! #REF!
Sub Jumlah #REF!
III PEKERJAAN ALUMUNIUM
1 Pas. Pintu type P1, Alumuium 4" Silver unit 2.00 #REF! #REF!
2 Pas. Pintu type P2, Alumuium 4" Silver unit 5.00 #REF! #REF!
3 Pas. Pintu type P3, Alumuium 4" Silver unit 3.00 #REF! #REF!
Pas. Pintu type P4, Alumuium 4" Silver unit #REF! #REF!
4 Pas. Jendela type J2, Alumuium 4" Silver unit 1.00 #REF! #REF!
5 Pas. Jendela type J3, Alumuium 4" Silver unit 12.00 #REF! #REF!
Pas. Jendela type J4, Alumuium 4" Silver unit #REF! #REF!
Pas. Bouvenlight BV1, Alumunium 4" Silver unit #REF! #REF!
Pas. Bouvenlight BV2, Alumunium 4" Silver unit #REF! #REF!
6 Pas. Bouvenlight BV3, Alumunium 4" Silver unit 6.00 #REF! #REF!
Sub Jumlah #REF!
IV PEKERJAAN PENUTUP ATAP
1 Pas. Rangka Atap Baja Ringan m2 359.55 160,000.00 57,528,000.00
3 Pas. Alumunium Foil m2 359.55 14,500.00 5,213,475.00
4 Pas. Atap Genteng Morando m2 359.55 #REF! #REF!
5 Pas. Bubungan Genteng Morando m' 46.50 #REF! #REF!
6 Pas. Listplank Kayu Berprofil m' 72.00 225,000.00 16,200,000.00
Sub Jumlah #REF!
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 840.78 #NAME? #NAME?
2 Pek. Pengecatan Plafond 3x m2 375.00 #NAME? #NAME?
3 Pek. Pengecatan Listplank GRC m2 14.80 #NAME? #NAME?
Sub Jumlah #NAME?
VI PEKERJAAN SANITARY ###
1 Pas. Closet Duduk unit 1.00 #REF! #REF!
2 Pas. Closet Jongkok bh 2.00 #REF! #REF!
3 Pas. Floor Drain Stainles bh 3.00 #REF! #REF!
4 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh 3.00 #REF! #REF!
5 Pas. Kran Air dia. 1/2" bh 4.00 #REF! #REF!
6 Pas. Jet Washer bh 1.00 225,000.00 225,000.00
7 Pas. Tempat Sabun Keramik bh 3.00 65,450.00 196,350.00
8 Pas. Wastafel lengkap bh 1.00 #REF! #REF!
9 Pas. Bak Cuci piring 1 lobang Stainless steel bh 1.00 #REF! #REF!
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
10 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris bh 1.00 2,000,000.00 2,000,000.00
Sub Jumlah #REF!
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
VII PEKERJAAN LISTRIK ###
1 Pek. Instlalasi Penerangan (bahan+upah) ttk 25.00 170,000.00 4,250,000.00
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk 9.00 170,000.00 1,530,000.00
3 Pas. Lampu TL 20 watt + aksesoris Philips bh 9.00 155,100.00 1,395,900.00
4 Pas. Lampu SL bh 16.00 61,600.00 985,600.00
5 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh 9.00 50,600.00 455,400.00
6 Pas. Saklar Ganda , sek. Broco bh 4.00 50,600.00 202,400.00
7 Pas. Saklar Tunggal, sek. Broco bh 7.00 50,600.00 354,200.00
8 Pas. Box MCB + MCB 6 Group bh 1.00 450,000.00 450,000.00
Sub Jumlah 9,623,500.00
VIII PEKERJAAN PLUMBING ###
a. Pekerjaan Pipa Air Bersih
1 Pas. Pipa PVC AW dia. 1" sek. Maspion m' 12.00 #REF! #REF!
2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' 24.00 #REF! #REF!
3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' 32.00 #REF! #REF!
b. Pekerjaan Pipa Air bekas , Air kotor & vent
1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' 12.00 #REF! #REF!
2 Pas. Pipa PVC AW dia. 3" sek. Maspion m' 16.00 #REF! #REF!
Sub Jumlah #REF!
D PEKERJAAN PAGAR
I PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 73.60 56,375.00 4,149,200.00
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 25.76 41,250.00 1,062,600.00
3 Pek. Pondasi Batu Belas ad 1:5 m3 31.68 #NAME? #NAME?
4 Pek. Sloof Beton 15/20 m3 3.96 #NAME? #NAME?
5 Pas. Kolom 20/20 m3 2.64 #NAME? #NAME?
6 Pek. Dinding Bata 1 : 5 m2 132.00 #NAME? #NAME?
7 Pek. Plesteran + Acian 1 : 5 m2 264.00 #NAME? #NAME?
8 Pek. Balok/Ringbalk beton bertulang 15/20 m3 3.60 #NAME? #NAME?
9 Pek. Pagar Besi Hollow m' 30.00 550,000.00 16,500,000.00
10 Pek. Pintu Pagar Besi Hollow bh 2.00 4,500,000.00 9,000,000.00

Sub Jumlah
II PEKERJAAN LAPANGAN PARKIR
1 Pek. Striping Tanah m2 1.00 4,125.00 4,125.00
2 Pas. Lapis Pondasi Bawah m3 86.40 #REF! #REF!
3 Pas. Lapis Pondasi Atas m3 64.80 #REF! #REF!
4 Pas. Lapis Penetrasi m2 432.00 #REF! #REF!

Sub Jumlah #REF!


D PEKERJAAN LAIN LAIN
1 Pek. Plank Nama bh 1.00 5,500,000.00 5,500,000.00
" PUSKESMAS AGRABINTA " -
Kecamatan Sukaresmi - Kabupaten Cianjur -
2 Pek. Tangga Pipa Besi bh 1.00 1,500,000.00 1,500,000.00
3 Pek. Tutup Man Hole bh 1.00 850,000.00 850,000.00

Sub Jumlah 7,850,000.00


RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN KANTOR DINAS KEPENDUDUKAN DAN CATATAN SIPIL
KABUPATEN CIANJUR
SATKER : DINAS TATA RUANG DAN PERMUKIMAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016

VOLUME HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

A PEKERJAAN PERSIAPAN
1 Pengukuran & Pasang Bouwplank 114.00 ls #NAME? #NAME?
2 Pembuatan Dreksikeet 1.00 ls 5,000,000.00 5,000,000.00
3 Mobilisasi Alat Dan Bahan 1.00 ls 25,000,000.00 25,000,000.00
4 Administrasi, Perijinan Dan Dokumentasi 1.00 ls 2,000,000.00 2,000,000.00
5 Pengadaan Listrik Kerja 1.00 ls 1,000,000.00 1,000,000.00
6 Pengadaan Air Kerja 1.00 ls 1,000,000.00 1,000,000.00
7 Pas. Pagar Pengaman Proyek 44.00 m' #NAME? #NAME?
8 Pembersihan Area Bekas Pekerjaan 1.00 ls 2,000,000.00 2,000,000.00
Sub Jumlah #NAME?
B LANTAI 1
I PEKERJAAN TANAH
1 Pek. Urugan Tanah (Bahan dari luar) 2,362.50 m3 - -
2 Pek. Galian Tanah 186.00 m3 69,300.00 12,889,800.00
3 Pek. Urugan Tanah Kembali 120.90 m3 41,250.00 4,987,125.00
4 Pek. Urugan Tanah Peninggian Lantai ( Tinggi 20 cm ) 108.00 m3 41,250.00 4,455,000.00
5 Pek. Urugan Pasir Bawah Lantai 30.60 m3 #NAME? #NAME?
-
Sub Jumlah #NAME?
II PEKERJAAN BETON DAN TEMBOKAN
1 Aanstamping Batu Kali ( 1: 5 ) 5.67 m3 #NAME? #NAME?
2 Pondasi Batu Kali ( 1 : 5 ) 14.70 m3 #NAME? #NAME?
3 Pondasi Setempat uk. 150 x 150 cm 25.20 m3 #NAME? #NAME?
4 Pondasi Setempat uk. 100 x 100 cm 1.20 m3 #NAME? #NAME?
5 Kolom Pedestal uk. 45/45 17.20 m3 #REF! #REF!
6 Kolom Pedestal uk. 25/25 0.19 m3 #REF! #REF!
7 Sloof BS1 ( 20/40 ) 33.60 m3 #REF! #REF!
8 Balok 25/50 35.63 m3 #REF! #REF!
9 Balok 15/30 8.69 m3 - -
10 Kolom uk. 45/45 32.00 m3 - -
11 Kolom uk. 25/25 0.64 m3 #NAME? #NAME?
12 Lantai Beton t = 12 cm 73.44 m3 #NAME? #NAME?
13 Pas.Dinding 1/2 Bata ( 1 : 5 ) 511.36 m2 #NAME? #NAME?
14 Plesteran dan aci ( 1 : 5 ) 1,022.72 m2 #NAME? #NAME?
15 Acian Kolom Exposed 224.00 m2 30,410.00 6,811,840.00
16 Kolom Praktis uk. 12/12 cm 1.97 m3 #NAME? #NAME?
17 Topi Beton t = 7 cm 1.32 m3 #NAME? #NAME?
18 Balok Lintel 1.91 m3 - -
19 Meja Beton Los 0.13 m3 #NAME? #NAME?
20 Lantai Keramik uk. 60 x 60 cm 585.00 m2 - -
21 Pas. Lantai Keramik uk. 20 x 20 cm 27.00 m2 #NAME? #NAME?
22 Pas. Dinding Keramik uk. 20 x 25 cm 78.60 m2 #REF! #REF!
23 Pas. Dinding Batu Alam 21.00 m2 #NAME? #NAME?
24 Lantai Kerja tebal = 5 cm 30.94 m3 #NAME? #NAME?

Sub Jumlah #NAME?


III PEK. PENGECATAN
1 Pengecatan Dinding 1,500.72 m2 #NAME? #NAME?
2 Pengecatan Plafond 612.00 m2 #NAME? #NAME?

Sub Jumlah #NAME?


IV PEK. ALUMUNIUM
1 Pas. Kusen Pintu Alumunium PU 2.00 Unit #REF! #REF!
2 Pas. Kusen Pintu Alumunium P1 Silver 4" 9.00 Unit #REF! #REF!

Hal 52
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

3 Pas. Kusen Pintu Alumunium P2 Silver 4" 5.00 Unit #REF! #REF!
4 Pas. Kusen Pintu Alumunium P3 Silver 4" 6.00 Unit #REF! #REF!
5 Pas. Jendela Alumunium JP Silver 4" 2.00 Unit #REF! #REF!
6 Pas. Jendela Alumunium JU Silver 4" 1.00 Unit #REF! #REF!
7 Pas. Kusen Jendela Alumunium J2 Silver 4" 6.00 Unit #REF! #REF!
8 Pas. Kusen Jendela Alumunium J3 Silver 4" 13.00 Unit #REF! #REF!
9 Pas. Kusen Bouvenlight Alumunium BV1 Silver 4" 8.00 Unit #REF! #REF!
10 Pas. Railling Tangga 15.20 m' 650,000.00 9,880,000.00

Sub Jumlah #REF!


V PEK. PARTISI DAN PLAFOND
1 Pas. Rangka Dinding Partisi Gypsum 254.00 m2 #VALUE! #VALUE!
2 Pas. Penutup Dinding Gypsum 9 mm 254.00 m2 - -
3 Pek. Rangka Plafond Besi Hollow 612.00 m2 - -
4 Pas. Penutup Plafond Gypsum 9 mm 591.75 m2 - -
5 Pas. Penutup Plafond GRC 4 mm 20.25 m2 - -
6 Pek. List Plafond 227.00 m' - -

Sub Jumlah #VALUE!


VI PEK. ELEKTRIKAL
1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 59.00 Titik 175,000.00 10,325,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 16.00 Titik 175,000.00 2,800,000.00
3 Instalasi Titik AC 11.00 Titik 350,000.00 3,850,000.00
4 Pas. Lampu RM 2x 20 watt 47.00 bh 375,000.00 17,625,000.00
5 Pas. Lampu Down Light 10.00 bh 175,000.00 1,750,000.00
6 Pas. Lampu Baret 2.00 bh 450,000.00 900,000.00
7 Saklar Tunggal 11.00 bh 50,600.00 556,600.00
8 Saklar Ganda 18.00 bh 50,600.00 910,800.00
9 Stop Kontak 16.00 bh 50,600.00 809,600.00
10 Pas. AC 11.00 unit 6,500,000.00 71,500,000.00
11 BP Listrik (Daya 9000 kwh) 1.00 unit 13,050,000.00 13,050,000.00
12 Biaya SLO 1.00 unit 4,050,000.00 4,050,000.00
13 Pas. Panel SDP 1.00 unit 11,000,000.00 11,000,000.00

Sub Jumlah #REF!


VII PEKERJAAN SANITARY -
1 Pas. Closet Jongkok 4.00 bh #REF! #REF!
2 Pas. Closet Duduk 2.00 bh 2,500,000.00 5,000,000.00
3 Pas. Floor Drain Stainles 7.00 bh #REF! #REF!
4 Pas. Wastafel 2.00 bh 950,000.00 1,900,000.00
5 Pas. Jet Washer 2.00 bh 185,000.00 370,000.00
6 Pas. Bak Mandi Fiber uk. 60 x 60 motif 6.00 bh #REF! #REF!
7 Pas. Kran Air dia. 1/2" 8.00 bh #REF! #REF!
8 Pas. Kitchenzink 1.00 bh #REF! #REF!
9 Pas. Instalasi Air Kotor Pipa PVC dia 4" 56.00 m1 #REF! #REF!
10 Pas. Instalasi Air Bersih Pipa PVC dia 1/2" 84.00 m1 #REF! #REF!
11 Pas. Pompa Air 1.00 unit 1,500,000.00 1,500,000.00
12 Pas. Sumur Bor 1.00 unit 13,500,000.00 13,500,000.00
13 Pas. Septicktank 1,5 x 1 x 1,5 m + Rembesan 2.00 unit #REF! #REF!
14 Pas. Saluran Gravel + Pasangan Bata 126.00 m' #REF! #REF!

Sub Jumlah #REF!


D LANTAI 2
I PEKERJAAN BETON DAN TEMBOKAN
2 Balok 15/30 0.90 m3 - -
3 Kolom uk. 45/45 32.00 m3 - -
4 Kolom uk. 25/25 0.64 m3 #NAME? #NAME?
5 Dak Beton t = 10 cm 10.00 m3 #NAME? #NAME?
6 Pas.Dinding 1/2 Bata ( 1 : 5 ) 511.36 m2 #NAME? #NAME?
7 Plesteran dan aci ( 1 : 5 ) 1,022.72 m2 #NAME? #NAME?
8 Acian Kolom Exposed 196.00 m2 30,410.00 5,960,360.00
9 Kolom Praktis uk. 12/12 cm 1.97 m3 #NAME? #NAME?
10 Ringbalok RB1 ( 15/25 ) 8.51 m3 #NAME? #NAME?
11 Balok Lintel 1.91 m3 - -
12 Topi Beton t = 7 cm 1.26 m3 - -

Hal 53
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

13 Meja Beton Los 0.13 m3 #NAME? #NAME?


14 Lantai Keramik uk. 60 x 60 cm 591.80 m2 #REF! #REF!
15 Pas. Lantai Keramik uk. 20 x 20 cm 27.00 m2 #NAME? #NAME?
16 Pas. Dinding Keramik uk. 20 x 25 cm 78.60 m2 #REF! #REF!
17 Pas. Dinding Batu Alam 21.00 m2 #NAME? #NAME?
18 Lantai Kerja tebal = 5 cm 30.94 m3 #NAME? #NAME?

Sub Jumlah #NAME?


II PEK. PENGECATAN
1 Pengecatan Dinding 1,504.72 m2 #NAME? #NAME?
2 Pengecatan Plafond 612.00 m2 #NAME? #NAME?
3 Pengecatan Kayu 33.42 m2 #NAME? #NAME?

Sub Jumlah #NAME?

Hal 54
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

III PEK. BESI DAN ALUMUNIUM


1 Pas. Kusen Pintu Alumunium P1 Silver 4" 6.00 Unit #REF! #REF!
2 Pas. Kusen Pintu Alumunium P2 Silver 4" 14.00 Unit #REF! #REF!
3 Pas. Kusen Pintu Alumunium P3 Silver 4" 5.00 Unit #REF! #REF!
4 Pas. Kusen Jendela Alumunium J2 Silver 4" 4.00 Unit #REF! #REF!
5 Pas. Kusen Jendela Alumunium J3 Silver 4" 17.00 Unit #REF! #REF!
5 Pas. Kusen Bouvenlight Alumunium BV1 Silver 4" 7.00 Unit #REF! #REF!
6 Pas. Railling Tangga 15.20 m' 650,000.00 9,880,000.00

Sub Jumlah #REF!


IV PEK. ATAP
1 Pas. Kuda kuda Besi Siku 4,251.17 kg 24,757.00 105,246,133.17
2 Pas. Gording C 150.65.20.3,2 5,756.79 kg 24,757.00 142,520,862.41
3 Pas. Rangka Atap Genteng keramik (Baja Ringan) 712.32 m2 100,000.00 71,232,000.00
4 Pas. Penutup Atap Genteng Morando 712.32 m2 - -
5 Pas. Bubungan Genteng Morando 62.00 m2 - -
6 Pas. Listplank Ukir 111.40 m' 225,000.00 25,065,000.00

Sub Jumlah 344,063,995.58


V PEK. KAYU DAN PLAFOND
1 Pas. Rangka Dinding Partisi Gypsum 286.00 m2 #VALUE! #VALUE!
2 Pas. Penutup Dinding Gypsum 9 mm 286.00 m2 - -
3 Pek. Rangka Plafond Besi Hollow 612.00 m2 - -
4 Pas. Penutup Plafond Gypsum 9 mm 591.75 m2 - -
5 Pas. Penutup Plafond GRC 4 mm 126.25 m2 - -
6 Pek. List Plafond 227.00 m' - -

Sub Jumlah #VALUE!


VI PEK. ELEKTRIKAL
1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 66.00 Titik 175,000.00 11,550,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 24.00 Titik 175,000.00 4,200,000.00
3 Instalasi Titik AC 12.00 Titik 350,000.00 4,200,000.00
4 Pas. Lampu RM 2x 20 watt 53.00 bh 350,000.00 18,550,000.00
5 Pas. Lampu Down Light 11.00 bh 175,000.00 1,925,000.00
6 Saklar Tunggal 11.00 bh 50,600.00 556,600.00
7 Saklar Ganda 18.00 bh 50,600.00 910,800.00
8 Stop Kontak 24.00 bh 50,600.00 1,214,400.00
9 Pas. AC 16.00 unit 6,500,000.00 104,000,000.00
10 Penangkal Petir 1.00 unit #REF! #REF!

Sub Jumlah #REF!


VII PEKERJAAN SANITARY -
1 Pas. Closet Jongkok 4.00 bh #REF! #REF!
2 Pas. Closet Duduk 2.00 bh #REF! #REF!
3 Pas. Floor Drain Stainles 7.00 bh #REF! #REF!
4 Pas. Wastafel 4.00 bh #REF! #REF!
5 Pas. Bak Mandi Fiber uk. 60 x 60 motif 6.00 bh #REF! #REF!
6 Pas. Kran Air dia. 1/2" 8.00 bh #REF! #REF!
7 Pas. Kitchenzink 1.00 bh #REF! #REF!
8 Pas. Instalasi Air Kotor Pipa PVC dia 4" 56.00 m1 #REF! #REF!
9 Pas. Instalasi Air Bersih Pipa PVC dia 1/2" 112.00 m1 #REF! #REF!
10 Pas. Water Torn Kapasitas 1000 ltr 2.00 unit 3,000,000.00 6,000,000.00

Sub Jumlah #REF!


E PEKERJAAN SARANA DAN PRASARANA

I JALAN DAN PELATARAN PARKIR

1 Pek. Striping Tanah 636.00 m3 4,125.00 2,623,500.00


2 Pek. Galian Tanah 127.20 m3 56,375.00 7,170,900.00
3 Pas. Lapis Pondasi Bawah t = 20 cm 127.20 m3 #REF! #REF!
4 Pas. Lapis Pondasi Atas t = 15 cm 95.40 m3 #REF! #REF!
5 Pas. Lapis Penetrasi t = 5 cm 636.00 m2 #REF! #REF!
6 Pas. Kanstein 162.00 m' 185,000.00 29,970,000.00

Hal 55
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

Sub Jumlah #REF!

II POS SATPAM

1 Pek. Galian Tanah 11.20 m3 56,375.00 631,400.00


2 Pek. Urugan Tanah Kembali 5.60 m3 41,250.00 231,000.00
3 Pek. Urugan Pasir Bawah Pasangan 0.63 m3 #NAME? #NAME?
4 Aanstamping Batu Kali ( 1: 5 ) 2.10 m3 #NAME? #NAME?
5 Pondasi Batu Kali ( 1 : 5 ) 5.12 m3 #NAME? #NAME?
6 Pondasi Setempat uk. 80 x 80 cm 1.15 m3 #NAME? #NAME?
7 Kolom Pedestal uk. 20/20 0.24 m3 #NAME? #NAME?
8 Sloof ( 15/20 ) 0.53 m3 #NAME? #NAME?
9 Kolom uk. 20/20 0.72 m3 #NAME? #NAME?
10 Plat Beton t = 10 cm 2.60 m3 #NAME? #NAME?
11 Pas.Dinding 1/2 Bata ( 1 : 5 ) 48.00 m2 #NAME? #NAME?
12 Plesteran dan aci ( 1 : 5 ) 92.40 m2 #NAME? #NAME?
13 Pas. Keramik 30/30 26.00 m2 #NAME? #NAME?
14 Pas. Kusen Pintu Alumunium P1 Warna 2.00 unit #REF! #REF!
15 Pas. Kusen Jendela Alumunium J1 Warna 2.00 unit #REF! #REF!
16 Ringbalok RB1 ( 15/20 ) 0.53 m3 #NAME? #NAME?
17 Pas. Batu Tempel 12.00 m2 #NAME? #NAME?
18 Pas. Saluran Gravel + Pasangan Bata 21.00 m' #REF! #REF!
19 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 2.00 Titik 175,000.00 350,000.00
20 Pas. Lampu TL 2.00 bh 155,100.00 310,200.00
21 Pas. Saklar 1.00 bh 50,600.00 50,600.00
22 Pas. Stop Kontak 1.00 bh 50,600.00 50,600.00

Sub Jumlah #NAME?

III KANTIN

1 Pek. Galian Tanah 40.00 m3 56,375.00 2,255,000.00


2 Pek. Urugan Tanah Kembali 16.00 m3 41,250.00 660,000.00
3 Pek. Urugan Pasir Bawah Pasangan 3.20 m3 #NAME? #NAME?
4 Aanstamping Batu Kali ( 1: 5 ) 7.50 m3 #NAME? #NAME?
5 Pondasi Batu Kali ( 1 : 5 ) 18.28 m3 #NAME? #NAME?
6 Sloof ( 15/20 ) 1.88 m3 #NAME? #NAME?
7 Kolom uk. 20/20 1.40 m3 #NAME? #NAME?
8 Pas.Dinding 1/2 Bata ( 1 : 5 ) 156.25 m2 #NAME? #NAME?
9 Plesteran dan aci ( 1 : 5 ) 312.50 m2 #NAME? #NAME?
10 Pas. Lantai Keramik 30/30 48.00 m2 #NAME? #NAME?
11 Pas. Lantai Keramik 20/20 6.00 m2 #NAME? #NAME?
12 Pas. Dinding Keramik 20/25 15.60 m2 #NAME? #NAME?
13 Pas. Kusen Pintu Alumunium P1 Warna 2.00 unit #REF! #REF!
14 Pas. Kusen Jendela Alumunium BV Warna 5.00 unit #REF! #REF!
15 Ringbalok RB1 ( 15/20 ) 1.88 m3 #NAME? #NAME?
16 Pas. Balok Lintel 0.22 m3 #REF! #REF!
17 Pas. Batu Tempel 12.80 m2 #NAME? #NAME?
18 Pas. Saluran Gravel + Pasangan Bata 48.00 m' #REF! #REF!
19 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 10.00 Titik 175,000.00 1,750,000.00
20 Instalasi Titik Saklar ( Kabel ( NYM 3 x 2.5 mm ) 3.00 Titik 175,000.00 525,000.00
21 Pas. Lampu TL 3.00 bh 155,100.00 465,300.00
22 Pas. Lampu SL 7.00 bh 61,600.00 431,200.00
23 Pas. Saklar 3.00 bh 50,600.00 151,800.00
24 Pas. Stop Kontak 6.00 bh 50,600.00 303,600.00
25 Pas. Rollingdoor 26.40 m2 500,000.00 13,200,000.00

Sub Jumlah #NAME?

Hal 56
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG DAN REVITALISASI PUSKESMAS MAMPU PONED
PEKERJAAN : PEMBANGUNAN LANJUTAN PUSKESMAS PUSAKASARI
KABUPATEN CIANJUR
SATKER : DINAS KESEHATAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016

VOLUME HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

A PEKERJAAN PERSIAPAN
1 Sewa Dreksikeet 1.00 ls 500,000.00 500,000.00
2 Administrasi, Perijinan Dan Dokumentasi 1.00 ls 1,000,000.00 1,000,000.00
3 Pengadaan Listrik Kerja 1.00 ls 1,000,000.00 1,000,000.00
4 Pengadaan Air Kerja 1.00 ls 1,000,000.00 1,000,000.00
5 Pembersihan Area Bekas Pekerjaan 1.00 ls 2,000,000.00 2,000,000.00
Sub Jumlah 5,500,000.00
B LANTAI 1
I PEKERJAAN BETON DAN TEMBOKAN
1 Aanstamping Batu Kali ( 1: 5 ) m3 215,499.00 -
2 Pondasi Batu Kali ( 1 : 5 ) m3 197,410.00 -
3 Pondasi Setempat uk. 150 x 150 cm m3 1,275,120.00 -
4 Kolom Pedestal uk. 50/50 m3 1,464,265.00 -
5 Sloof BS1 ( 20/40 ) m3 3,415,399.00 -
1 Balok 25/50 m3 5,450,056.00 -
2 Balok 15/30 m3 7,269,122.00 -
3 Kolom uk. 50/50 m3 5,768,700.00 -
4 Kolom uk. 30/30 m3 4,817,753.00 -
5 Lantai Beton t = 12 cm m3 5,051,870.00 -
6 Pas.Dinding 1/2 Bata ( 1 : 5 ) m2 133,287.00 -
7 Plesteran dan aci ( 1 : 5 ) m2 65,943.00 -
8 Acian Kolom Exposed m2 28,683.00 -
9 Kolom Praktis uk. 12/12 cm m3 6,987,363.00 -
10 Topi Beton t = 7 cm m3 5,839,988.00 -
11 Balok Lintel m3 5,773,335.00 -
12 Meja Beton Los m3 5,839,988.00 -
12 Lantai Keramik uk. 40 x 40 cm m2 215,499.00 -
13 Pas. Lantai Keramik uk. 20 x 20 cm 8.00 m2 197,410.00 1,579,280.00
14 Pas. Dinding Keramik uk. 20 x 25 cm 83.85 m2 214,380.00 17,975,763.00
1 Pas. Dinding Batu Alam 18.00 m2 #NAME? #NAME?
2 Lantai Kerja tebal = 5 cm m3 922,997.00 -

Sub Jumlah #NAME?

II PEK. PENGECATAN
1 Pengecatan Dinding 933.02 m2 #NAME? #NAME?
2 Pengecatan Plafond 294.13 m2 #NAME? #NAME?
3 Pengecatan Kayu m2 25,553.00 -

Sub Jumlah #NAME?

III PEK. ALUMUNIUM


1 Pas. Kusen Pintu Alumunium P1 Warna 4" 5.00 Unit #REF! #REF!
2 Pas. Kusen Pintu Alumunium P2 Warna 4" 6.00 Unit #REF! #REF!
3 Pas. Kusen Pintu Alumunium P3 Warna 4" 1.00 Unit #REF! #REF!
4 Pas. Kusen Pintu Alumunium P4 Warna 4" 1.00 Unit 1,800,000.00 1,800,000.00
5 Pas. Railling Tangga 7.60 m' 850,000.00 6,460,000.00

Sub Jumlah #REF!

IV PEK. PARTISI DAN PLAFOND

Hal 57
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

1 Pek. Rangka Plafond Besi Hollow 294.13 m2 #REF! #REF!


2 Pas. Penutup Plafond Gypsum 9 mm 218.38 m2 #REF! #REF!
3 Pas. Penutup Plafond GRC 4 mm 75.75 m2 #REF! #REF!
4 Pek. List Plafond 367.00 m' #REF! #REF!

Sub Jumlah #REF!

V PEK. ELEKTRIKAL
1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 38.00 Titik 175,000.00 6,650,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 12.00 Titik 175,000.00 2,100,000.00
3 Pas. Lampu RM 2x 20 watt 13.00 bh 375,000.00 4,875,000.00
4 Pas. Lampu Down Light 14.00 bh 175,000.00 2,450,000.00
5 Saklar Tunggal 7.00 bh 50,600.00 354,200.00
6 Saklar Ganda 8.00 bh 50,600.00 404,800.00
7 Stop Kontak 12.00 bh 50,600.00 607,200.00
8 BP Listrik (Daya 9000 kwh) 1.00 unit 8,100,000.00 8,100,000.00
9 Biaya SLO 1.00 unit 2,100,000.00 2,100,000.00
10 Pas. Panel SDP 1.00 unit 11,000,000.00 11,000,000.00

Sub Jumlah 38,641,200.00

Hal 58
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

VI PEKERJAAN SANITARY -
1 Pas. Closet Duduk 2.00 bh #REF! #REF!
2 Pas. Floor Drain Stainles 2.00 bh #REF! #REF!
3 Pas. Wastafel 3.00 bh #REF! #REF!
4 Pas. Bak Mandi Fiber uk. 60 x 60 motif 2.00 bh #REF! #REF!
5 Pas. Kran Air dia. 1/2" 2.00 bh #REF! #REF!
6 Pas. Kitchenzink 1.00 bh #REF! #REF!
7 Pas. Instalasi Air Kotor Pipa PVC dia 4" 8.00 m1 #REF! #REF!
8 Pas. Instalasi Air Bersih Pipa PVC dia 1/2" 32.00 m1 #REF! #REF!
9 Pas. Pompa Air 1.00 unit 2,500,000.00 2,500,000.00
10 Pas. Sumur Bor 1.00 unit 13,500,000.00 13,500,000.00
11 Pas. Septicktank 1,5 x 1 x 1,5 m + Rembesan 1.00 unit #REF! #REF!
12 Pas. Saluran Air Hujan Gravel 1/2 dia. 20 cm 96.00 m' #REF! #REF!

Sub Jumlah #REF!


D LANTAI 2
I PEKERJAAN BETON DAN TEMBOKAN
1 Pas.Dinding 1/2 Bata ( 1 : 5 ) 21.00 m2 #NAME? #NAME?
2 Plesteran dan aci ( 1 : 5 ) 600.61 m2 #NAME? #NAME?
3 Meja Beton Los 0.18 m3 #NAME? #NAME?
4 Lantai Keramik uk. 40 x 40 cm 217.38 m2 #NAME? #NAME?
5 Pas. Lantai Keramik uk. 20 x 20 cm 13.00 m2 #NAME? #NAME?
6 Pas. Dinding Keramik uk. 20 x 25 cm 33.00 m2 #NAME? #NAME?
7 Pas. Dinding Batu Alam 3.40 m2 #NAME? #NAME?

Sub Jumlah #NAME?

II PEK. PENGECATAN
1 Pengecatan Dinding 924.02 m2 #NAME? #NAME?
2 Pengecatan Plafond 303.13 m2 #NAME? #NAME?
3 Pengecatan Kayu 13.55 m2 #NAME? #NAME?

Sub Jumlah #NAME?

III PEK. BESI DAN ALUMUNIUM


1 Pas. Kusen Pintu Alumunium P1 4" 1.00 Unit #REF! #REF!
1 Pas. Kusen Pintu Alumunium P2 4" 11.00 Unit #REF! #REF!
2 Pas. Kusen Pintu Alumunium P3 4" 2.00 Unit #REF! #REF!
3 Pas. Kusen Jendela Alumunium J3 Warna 4" - Unit #REF! #REF!
4 Pas. Kusen Jendela Alumunium J2 4" 12.00 Unit #REF! #REF!
5 Pas. Kusen Jendela Alumunium J1 Warna 4" 2.00 Unit #REF! #REF!
6 Pas. Kusen Bouvenlight Alumunium BV2 Warna 4" 4.00 Unit 950,000.00 3,800,000.00
7 Pas. Kusen Bouvenlight Alumunium BV1 Warna 4" - Unit 700,000.00 -

Sub Jumlah #REF!

IV PEK. KAYU DAN PLAFOND


1 Pek. Rangka Plafond Besi Hollow 303.13 m2 #REF! #REF!
2 Pas. Penutup Plafond Gypsum 9 mm 230.38 m2 #REF! #REF!
3 Pas. Penutup Plafond GRC 4 mm 72.75 m2 #REF! #REF!
4 Pek. List Plafond 389.00 m' #REF! #REF!

Sub Jumlah #REF!

V PEK. ELEKTRIKAL
1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 23.00 Titik 175,000.00 4,025,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 14.00 Titik 175,000.00 2,450,000.00
3 Pas. Lampu RM 2x 20 watt 12.00 bh 375,000.00 4,500,000.00
4 Pas. Lampu Down Light 12.00 bh 175,000.00 2,100,000.00
5 Saklar Tunggal 9.00 bh 50,600.00 455,400.00
6 Saklar Ganda 5.00 bh 50,600.00 253,000.00

Hal 59
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

7 Stop Kontak 12.00 bh 50,600.00 607,200.00


8 Pas. AC 1.00 unit 6,500,000.00 6,500,000.00
9 Penangkal Petir 1.00 unit #REF! #REF!

Sub Jumlah #REF!

Hal 60
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

VII PEKERJAAN SANITARY -


1 Pas. Closet Jongkok 1.00 bh #REF! #REF!
2 Pas. Closet Duduk 1.00 bh #REF! #REF!
3 Pas. Floor Drain Stainles 2.00 bh #REF! #REF!
4 Pas. Wastafel 1.00 bh #REF! #REF!
5 Pas. Bak Mandi Fiber uk. 60 x 60 motif 2.00 bh #REF! #REF!
6 Pas. Kran Air dia. 1/2" 2.00 bh #REF! #REF!
7 Pas. Kitchenzink 1.00 bh #REF! #REF!
8 Pas. Instalasi Air Kotor Pipa PVC dia 4" 24.00 m1 #REF! #REF!
9 Pas. Instalasi Air Bersih Pipa PVC dia 1/2" 18.00 m1 #REF! #REF!

Sub Jumlah #REF!


E PEKERJAAN SARANA DAN PRASARANA
I PAGAR

1 Pek. Galian Tanah 72.00 m3 56,375.00 4,059,000.00


2 Aanstamping Batu Kali ( 1: 5 ) 12.00 m3 #NAME? #NAME?
3 Pondasi Batu Kali ( 1 : 5 ) 40.00 m3 #NAME? #NAME?
4 Kolom Pedestal uk. 30/30 2.46 m3 #NAME? #NAME?
5 Sloof ( 15/20 ) 3.00 m3 #NAME? #NAME?
6 Pas.Dinding 1/2 Bata ( 1 : 5 ) 90.00 m2 #NAME? #NAME?
7 Plesteran dan aci ( 1 : 5 ) 180.00 m2 #NAME? #NAME?
8 Pas. Saluran L = 40 cm + Plat Decker 64.00 m' #NAME? #NAME?
9 Pas. Besi Pagar Hollow 38.00 m' 650,000.00 24,700,000.00
10 Pas. Pintu Pagar Besi Hollow (Pintu Sorong) 3.00 unit 5,600,000.00 16,800,000.00

Sub Jumlah #NAME?

II JALAN DAN PELATARAN PARKIR

1 Pek. Striping Tanah 225.00 m3 4,125.00 928,125.00


2 Pas. Lapis Pondasi Bawah t = 20 cm 45.00 m3 #REF! #REF!
3 Pas. Lapis Pondasi Atas t = 15 cm 33.75 m3 #REF! #REF!
4 Pas. Lapis Penetrasi t = 5 cm 225.00 m2 #REF! #REF!
5 Pas. Kanstein 82.00 m' 185,000.00 15,170,000.00

Sub Jumlah #REF!

Hal 61
RENCANA ANGGARAN BIAYA
KEGIATAN : PENGEMBANGAN KAPASITAS LOGISTIK PEDAGANG DAN PERDAGANGAN
PEKERJAAN : KONTRUKSI FISIK PASAR RAKYAT CIRANJANG
SATKER : DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016

HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama proyek ls 1.00 400,000.00 400,000.00
2 Pembuatan Direksikeet m2 18.00 #NAME? #NAME?
3 Administrasi, Perijinan IMB dan Dokumentasi ls 1.00 2,500,000.00 2,500,000.00
4 Mobilisasi Alat ls 1.00 15,000,000.00 15,000,000.00
5 Pek. Pengukuran Dan Bouwplank m' 212.00 #NAME? #NAME?
Sub Jumlah #NAME?
II PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 53.06 56,375.00 2,991,257.50
2 Pek. Galian Tanah untuk pondasi maks. 2 m m3 171.07 69,300.00 11,855,289.60
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 78.36 41,250.00 3,232,152.00
4 Pek. Urugan Tanah dibawah lantai dipadatkan m3 580.80 41,250.00 23,958,000.00
5 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 145.20 #NAME? #NAME?
Sub Jumlah #NAME?
III PEKERJAAN TEMBOKAN
1 Pas. Aanstamping m3 16.50 #NAME? #NAME?
2 Pek. Pondasi Batu Belah ad 1:5 m3 70.40 #NAME? #NAME?
3 Pek. Pondasi Foot Plat m3 39.53 #NAME? #NAME?
4 Pek. Sloof Beton 20/30 m3 44.88 #NAME? #NAME?
5 Pas. Kolom 30/40 m3 10.08 #NAME? #NAME?
6 Pek. Lantai Beton
- Adukan Beton K - 175 m3 435.60 #NAME? #NAME?
- Pas. Wiremesh M 8 m2 2,904.00 74,770.00 217,132,080.00
7 Pas. Bata Merah ad 1 : 5 m2 1,176.00 #NAME? #NAME?
8 Pek. Plesteran + Acian 1 : 5 m2 2,469.60 #NAME? #NAME?
9 Pek. Kolom Praktis 11/11 m3 7.32 #NAME? #NAME?
10 Pas. Meja Beton m3 57.98 #NAME? #NAME?
11 Pas. Keramik Meja uk. 20 x 20 cm DN m2 579.84 #NAME? #NAME?
12 Pas. Keramik Lantai uk 40 x 40 cm DN m2 2,904.00 #NAME? #NAME?
Sub Jumlah #NAME?
IV PEKERJAAN BAJA
1 Pas. Kolom IWF. 300.150.6.5.9 kg 8,176.76 24,757.00 202,432,047.32
2 Pas. Balok IWF. 250.125.6.9 kg 16,759.52 24,757.00 414,915,436.64
3 Pas. Balok IWF. 200.100.5,5.8 kg 7,765.33 24,757.00 192,246,357.33
4 Pas. Balok IWF. 150.75.5.7 kg 1,610.84 24,757.00 39,879,565.88
5 Pas. Besi C 150.65.20.3,2 kg 25,383.80 24,757.00 628,426,736.60
6 Pas. Track Stang kg 2,878.26 #NAME? #NAME?
7 Pas. Silang Angin kg 1,712.64 #NAME? #NAME?
8 Pek. Erikson Baja kg 59,696.25 1,652.09 98,623,583.17
9 Pas. Base Plat bh 54.00 225,000.00 12,150,000.00
10 Pas. Baut HTB Dia. 19 mm bh 2,160.00 20,000.00 43,200,000.00
#NAME?
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 2,469.60 #NAME? #NAME?
Sub Jumlah #NAME?
VI PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk 96.00 170,000.00 16,320,000.00
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk 48.00 170,000.00 8,160,000.00
3 Pas. Lampu TL 36 watt + aksesoris Philips & Penggantung bh 96.00 350,000.00 33,600,000.00
4 Pas. Stop Kontak , sek. Broco bh 48.00 50,600.00 2,428,800.00
5 Pas. Saklar Ganda , sek. Broco bh 24.00 50,600.00 1,214,400.00
Sub Jumlah 61,723,200.00
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
VII PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek Warna m2 3,214.80 155,000.00 498,294,000.00
2 Pas. Bubungan m' 44.00 95,000.00 4,180,000.00
3 Pas. Listplank m' 360.00 65,000.00 23,400,000.00
4 Pas. Dinding Spandex + Rangka m2 104.00 220,000.00 22,880,000.00
Sub Jumlah 548,754,000.00
VIII PEKERJAAN SALURAN AIR HUJAN
1 Pas. Saluran Air Hujan Gravel 1/2 dia. 30 cm m' 220.00 #NAME? #NAME?
2 Pas. Plat Decker m3 1.08 #NAME? #NAME?
3 Pas. Pipa PVC 2" m' 352.00 37,156.00 13,078,912.00
4 Pas. Floordrain bh 48.00 110,055.00 5,282,640.00
Sub Jumlah #NAME?
RENCANA ANGGARAN BIAYA
KEGIATAN : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA
PUSKESMAS/PUSTU DAN JARINGANNYA
PEKERJAAN : PEMBANGUNAN PUSKESMAS CIBEBER KECAMATAN CIBEBER
SATKER : DINAS KESEHATAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016

HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' 76.00 70,651.00 5,369,476.00
2 Pembuatan Papan Nama proyek ls 1.00 300,000.00 300,000.00
3 Sewa Direksikeet ls 1.00 2,000,000.00 2,000,000.00
4 Administrasi, Perijinan IMB dan Dokumentasi ls 1.00 1,000,000.00 1,000,000.00
5 Bongkaran ls 1.00 2,000,000.00 2,000,000.00
Sub Jumlah 10,669,476.00
B PEKERJAAN LANTAI I
I PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 44.50 60,500.00 2,692,250.00
2 Pek. Galian Tanah untuk pondasi maks. 2 m m3 101.16 74,250.00 7,511,130.00
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 50.98 44,000.00 2,243,164.00
4 Pek. Urugan Tanah dibawah lantai dipadatkan m3 51.60 44,000.00 2,270,400.00
5 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 12.90 169,400.00 2,185,260.00
Sub Jumlah 16,902,204.00
II PEKERJAAN TEMBOKAN
1 Pas. Aanstamping m3 6.68 432,003.00 2,883,620.03
2 Pek. Pondasi Batu Belah ad 1:5 m3 19.58 833,415.00 16,318,265.70
3 Pek. Pondasi Foot Plat m3 16.56 3,780,268.00 62,601,238.08
4 Pek. Sloof Beton 15/20 m3 1.34 5,310,279.00 7,089,222.47
5 Pek. Sloof Beton 20/30 m3 11.04 5,474,598.00 60,439,561.92
6 Pek. Kolom Praktis 12/12 m3 1.23 8,992,400.00 11,019,646.66
7 Pas. Kolom 20/20 m3 1.39 7,871,053.00 10,921,086.04
8 Pas. Kolom 30/30 m3 10.66 6,912,789.00 73,662,679.58
9 Pas. Balok Beton 20/40 m3 7.04 6,257,032.00 44,049,505.28
10 Pas. Balok Beton 15/30 m3 5.22 8,027,549.00 41,903,805.78
11 Pek. Plat Lantai Beton t = 12 cm m3 26.28 5,563,799.00 146,216,637.72
12 Pek. Dak Beton t = 10 cm m3 5.10 6,448,652.00 32,888,125.20
13 Pek. Listplank Beton t = 5 cm m3 0.42 6,673,815.00 2,803,002.30
14 Pek. Topi Beton m3 0.56 6,673,815.00 3,737,336.40
15 Pek. Plat Tangga Beton m3 1.89 5,563,799.00 10,515,580.11
16 Pek. Meja Beton m3 0.42 6,673,815.00 2,803,002.30
17 Pek. Balok Lintel 12/15 m3 0.87 6,341,822.00 5,502,164.77
18 Pek. Dinding Bata m2 616.27 138,684.00 85,466,441.97
19 Pek. Plesteran + Acian 1 : 5 m2 953.09 72,908.00 69,487,521.18
20 Pek. Lantai Rabat Beton ad 1:3:5 + acian m3 5.90 894,373.00 5,276,800.70
21 Pas. Lantai Keramik uk 20 x 20 cm DN m2 18.00 222,444.00 4,003,992.00
22 Pas. Lantai Keramik uk 40 x 40 cm DN m2 295.50 225,830.00 66,732,765.00
23 Pas. Dinding Keramik uk 20 x 25 cm DN m2 243.45 217,824.00 53,029,252.80
24 Pas. Batu Tempel m2 36.00 301,499.00 10,853,964.00

Sub Jumlah 830,205,217.97


III PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Besi Hollow Galvanis m2 268.00 90,695.00 24,306,260.00
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
2 Pas. Plafond Gypsum 9 mm m2 243.00 52,206.00 12,686,058.00
3 Pas. Plafond GRC 4 mm m2 25.00 41,155.00 1,028,875.00
4 Pek. List Plafond Gypsum (Plafond Gypsum ) m1 273.00 33,743.00 9,211,839.00
5 Pek. List Plafond Kayu (Plafond GRC ) m1 44.00 19,045.00 837,980.00
Sub Jumlah 48,071,012.00
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
IV PEKERJAAN ALUMUNIUM
1 Pas. Pintu type PG1, Alumuium 4" Silver unit 1.00 6,885,377.88 6,885,377.88
2 Pas. Pintu type P1, Alumuium 4" Silver unit 3.00 4,112,494.16 12,337,482.48
3 Pas. Pintu type P2, Alumuium 4" Silver unit 12.00 3,792,934.32 45,515,211.84
4 Pas. Pintu type P3, Alumuium 4" Silver unit 7.00 2,763,821.20 19,346,748.40
5 Pas. Pintu type P4, Alumuium 4" Silver unit 4.00 2,225,531.20 8,902,124.80
Pas. Pintu type P5, Alumuium 4" Silver unit 1,881,372.32 -
6 Pas. Jendela type J2, Alumuium 4" Silver unit 11.00 2,618,248.60 28,800,734.60
7 Pas. Jendela type J3, Alumuium 4" Silver unit 1.00 3,059,722.96 3,059,722.96
8 Pas. Jendela type J4, Alumuium 4" Silver unit 1.00 788,426.99 788,426.99
9 Pas. Bouvenlight BV1, Alumunium 4" Silver unit 3.00 325,582.35 976,747.05
Pas. Bouvenlight BV2, Alumunium 4" Silver 508,282.10 -
10 Pas. Bouvenlight BV3, Alumunium 4" Silver unit 3.00 817,289.70 2,451,869.10
Sub Jumlah 129,064,446.10
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 709.64 21,183.00 15,032,198.21
2 Pek. Pengecatan Plafond 3x m2 268.00 21,183.00 5,677,044.00
Sub Jumlah 20,709,242.21
VI PEKERJAAN SANITARY
1 Pas. Closet Jongkok bh 2.00 528,748.00 1,057,496.00
2 Pas. Closet Duduk bh 3.00 2,643,190.00 7,929,570.00
3 Pas. Floor Drain Stainles bh 5.00 115,610.00 578,050.00
4 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh 3.00 597,850.00 1,793,550.00
5 Pas. Kran Air dia. 1/2" bh 5.00 112,076.00 560,380.00
6 Pas. Tempat Sabun Keramik bh 3.00 65,450.00 196,350.00
7 Pas. Wastafel lengkap bh 8.00 1,487,948.00 11,903,584.00
8 Pas. Spoel Hook , sek TOTO ( lengkap assesories ) unit 1.00 10,000,000.00 10,000,000.00
9 Pas. Sumur bor + Pompa unit 1.00 11,250,000.00 11,250,000.00
10 Pek. Rumah Pompa lengkap aksesoris unit 1.00 1,000,000.00 1,000,000.00
11 Pek. Septiktank uk. 1.5 x 1 x 1.5 m unit 2.00 4,232,256.00 8,464,512.00
- bangunan septiktank
- valve, fitting & aksesoris
- pemipaan septiktank & bidang resapan
- galian & urugan
- bak kontrol

Sub Jumlah 54,733,492.00


VII PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk 34.00 170,000.00 5,780,000.00
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk 14.00 170,000.00 2,380,000.00
3 Pas. Lampu RM 2x 20 watt + aksesoris Philips bh 9.00 350,000.00 3,150,000.00
4 Pas. Lampu TL 20 watt + aksesoris Philips bh 4.00 155,100.00 620,400.00
5 Pas. Lampu Baret Kotak 20 watt aksesoris Philips bh 2.00 457,600.00 915,200.00
6 Pas. Lampu Downlight bh 6.00 177,100.00 1,062,600.00
7 Pas. Lampu SL bh 7.00 61,600.00 431,200.00
6 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh 14.00 50,600.00 708,400.00
7 Pas. Saklar Ganda , sek. Broco bh 8.00 50,600.00 404,800.00
8 Pas. Saklar Tunggal, sek. Broco bh 17.00 50,600.00 860,200.00
9 Pas. Box MCB + MCB 6 Group bh 1.00 650,000.00 650,000.00
10 Biaya penyambungan listrik (BP) ke PLN 6.5 KVA ls 1.00 5,000,000.00 5,000,000.00
Sub Jumlah 21,962,800.00
VIII PEKERJAAN PLUMBING
a. Pekerjaan Pipa Air Bersih
1 Pas. Pipa PVC AW dia. 1" sek. Maspion m' 18.00 21,000.00 378,000.00
2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' 18.00 18,641.00 335,538.00
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' 36.00 16,851.00 606,636.00
b. Pekerjaan Pipa Air bekas , Air kotor & vent
1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' 24.00 74,567.00 1,789,608.00
2 Pas. Pipa PVC AW dia. 3" sek. Maspion m' 24.00 52,402.00 1,257,648.00
3 Pas. Pipa PVC AW dia. 2" sek. Maspion m' 24.00 33,986.00 815,664.00
Sub Jumlah 5,183,094.00
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
C PEKERJAAN LANTAI II ###
I PEKERJAAN TEMBOKAN
1 Pek. Kolom Praktis 12/12 m3 0.89 8,992,400.00 7,962,770.20
2 Pas. Kolom 30/30 m3 6.30 6,912,789.00 43,550,570.70
3 Pek. Plat Lantai Beton m3 0.72 5,563,799.00 4,005,935.28
4 Pek. Balok/Ringbalk beton bertulang 15/20 m3 4.59 7,024,372.00 32,241,867.48
5 Pek. Meja Beton m3 0.08 6,673,815.00 560,600.46
6 Pek. Balok Lintel 12/15 m3 0.64 6,341,822.00 4,052,424.26
7 Pek. Dinding Bata m2 444.24 138,684.00 61,608,980.16
8 Pek. Plesteran + Acian 1 : 5 m 888.48 72,908.00 64,777,299.84
9 Pas. Lantai Keramik uk 20 x 20 cm DN m2 15.00 222,444.00 3,336,660.00
10 Pas. Lantai Keramik uk 40 x 40 cm DN m2 201.00 225,830.00 45,391,830.00
11 Pas. Dinding Keramik uk 20 x 25 cm DN m2 32.70 217,824.00 7,122,844.80
12 Pas. Batu Tempel m2 12.00 301,499.00 3,617,988.00

Sub Jumlah 274,611,783.18


II PEKERJAAN PLAFOND ###
1 Pek. Rangka Plafond Besi Hollow Galvanis m2 303.00 90,695.00 27,480,585.00
2 Pas. Plafond Gypsum 9 mm m2 231.00 52,206.00 12,059,586.00
3 Pas. Plafond GRC 4 mm m2 72.00 41,155.00 2,963,160.00
4 Pek. List Plafond Gypsum (Plafond Gypsum ) m' 360.00 33,743.00 12,147,480.00
Sub Jumlah 54,650,811.00
III PEKERJAAN ALUMUNIUM
1 Pas. Pintu type P1, Alumuium 4" Silver unit 2.00 4,112,494.16 8,224,988.32
2 Pas. Pintu type P2, Alumuium 4" Silver unit 1.00 3,792,934.32 3,792,934.32
3 Pas. Pintu type P3, Alumuium 4" Silver unit 7.00 2,763,821.20 19,346,748.40
4 Pas. Pintu type P4, Alumuium 4" Silver unit 3.00 2,225,531.20 6,676,593.60
5 Pas. Jendela type J2, Alumuium 4" Silver unit 12.00 2,618,248.60 31,418,983.20
6 Pas. Bouvenlight BV1, Alumunium 4" Silver unit 9.00 325,582.35 2,930,241.15
Sub Jumlah 64,165,500.67
IV PEKERJAAN PENUTUP ATAP
1 Pas. Rangka Atap Baja Ringan m2 375.24 160,000.00 60,038,400.00
3 Pas. Alumunium Foil m2 375.24 14,500.00 5,440,980.00
4 Pas. Atap Genteng Morando m2 375.24 107,503.00 40,339,425.72
5 Pas. Bubungan Genteng Morando m' 46.30 105,523.00 4,885,714.90
6 Pas. Listplank Kayu Berprofil m' 73.80 225,000.00 16,605,000.00
Sub Jumlah 127,309,520.62
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 888.48 21,183.00 18,820,671.84
2 Pek. Pengecatan Plafond 3x m2 375.00 21,183.00 7,943,625.00
3 Pek. Pengecatan Listplank GRC m2 22.14 28,949.00 640,930.86
Sub Jumlah 27,405,227.70
VI PEKERJAAN SANITARY ###
1 Pas. Closet Duduk unit 1.00 2,643,190.00 2,643,190.00
2 Pas. Closet Jongkok bh 2.00 528,748.00 1,057,496.00
3 Pas. Floor Drain Stainles bh 3.00 115,610.00 346,830.00
4 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh 3.00 597,850.00 1,793,550.00
5 Pas. Kran Air dia. 1/2" bh 4.00 112,076.00 448,304.00
6 Pas. Jet Washer bh 1.00 225,000.00 225,000.00
7 Pas. Tempat Sabun Keramik bh 3.00 65,450.00 196,350.00
8 Pas. Wastafel lengkap bh 1.00 1,487,948.00 1,487,948.00
9 Pas. Bak Cuci piring 1 lobang Stainless steel bh 1.00 467,830.00 467,830.00
10 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris bh 1.00 2,000,000.00 2,000,000.00
Sub Jumlah 10,666,498.00
HARGA JUMLAH

SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
VII PEKERJAAN LISTRIK ###
1 Pek. Instlalasi Penerangan (bahan+upah) ttk 25.00 170,000.00 4,250,000.00
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk 9.00 170,000.00 1,530,000.00
3 Pas. Lampu TL 20 watt + aksesoris Philips bh 9.00 155,100.00 1,395,900.00
4 Pas. Lampu SL bh 16.00 177,100.00 2,833,600.00
5 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh 9.00 50,600.00 455,400.00
6 Pas. Saklar Ganda , sek. Broco bh 4.00 50,600.00 202,400.00
7 Pas. Saklar Tunggal, sek. Broco bh 7.00 50,600.00 354,200.00
8 Pas. Box MCB + MCB 6 Group bh 1.00 450,000.00 450,000.00
Sub Jumlah 11,471,500.00
VIII PEKERJAAN PLUMBING ###
a. Pekerjaan Pipa Air Bersih
1 Pas. Pipa PVC AW dia. 1" sek. Maspion m' 12.00 21,000.00 252,000.00
2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' 24.00 18,641.00 447,384.00
3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' 32.00 16,851.00 539,232.00
b. Pekerjaan Pipa Air bekas , Air kotor & vent
1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' 12.00 74,567.00 894,804.00
2 Pas. Pipa PVC AW dia. 3" sek. Maspion m' 16.00 52,402.00 838,432.00
Sub Jumlah 2,971,852.00
D PEKERJAAN PAGAR
I PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 20.80 60,500.00 1,258,400.00
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 7.28 44,000.00 320,320.00
3 Pek. Pondasi Batu Belas ad 1:5 m3 6.24 833,415.00 5,200,509.60
4 Pek. Sloof Beton 15/20 m3 0.78 5,310,279.00 4,142,017.62
5 Pas. Kolom 20/20 m3 0.54 7,871,053.00 4,250,368.62
6 Pek. Dinding Bata 1 : 5 m2 39.00 138,684.00 5,408,676.00
7 Pek. Plesteran + Acian 1 : 5 m2 78.00 72,908.00 5,686,824.00
8 Pek. Balok/Ringbalk beton bertulang 15/20 m3 0.78 7,024,372.00 5,479,010.16
9 Pek. Pagar Besi Hollow m' 24.00 550,000.00 13,200,000.00
10 Pek. Pintu Pagar Besi Hollow bh 1.00 4,500,000.00 4,500,000.00

Sub Jumlah 49,446,126.00


II PEKERJAAN LAPANGAN PARKIR
1 Pek. Striping Tanah m2 1.00 4,400.00 4,400.00
2 Pas. Paving Block m3 462.00 120,945.00 55,876,590.00

Sub Jumlah 55,880,990.00


D PEKERJAAN LAIN LAIN
1 Pek. Plank Nama bh 1.00 5,500,000.00 5,500,000.00
" PUSKESMAS CIBEBER " -
Kecamatan Cibeber - Kabupaten Cianjur -
2 Pek. Tangga Pipa Besi bh 1.00 1,500,000.00 1,500,000.00
3 Pek. Tutup Man Hole bh 1.00 850,000.00 850,000.00

Sub Jumlah 7,850,000.00


REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : PENGEMBANGAN KAPASITAS LOGISTIK PEDAGANG DAN PERDAGANGAN
PEKERJAAN : KONTRUKSI FISIK PASAR RAKYAT CIRANJANG
SATKER : DINAS PERINDUSTRIAN DAN PERDAGANGAN
LOKASI : KECAMATAN CIANJUR
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016

JUMLAH HARGA
NO URAIAN PEKERJAAN PEKERJAAN
( Rp )
(a) (b) (c)

I PEKERJAAN PERSIAPAN #NAME?


II PEKERJAAN TANAH #NAME?
III PEKERJAAN TEMBOKAN #NAME?
IV PEKERJAAN BAJA #NAME?
V PEKERJAAN PENGECATAN #NAME?
VI PEKERJAAN LISTRIK 61,723,200.00
VII PEKERJAAN PENUTUP ATAP 548,754,000.00
VIII PEKERJAAN SALURAN AIR HUJAN #NAME?

TOTAL #NAME?
PPN 10 % #NAME?
JUMLAH TOTAL #NAME?
DIBULATKAN #NAME?
Terbilang :

#NAME?

Cianjur, ………………….. 2016


penawar
PT./ cv…………………….
RENCANA ANGGARAN BIAYA
KEGIATAN :

PEKERJAAN :
SATKER : DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016

SAT
NO. URAIAN PEKERJAAN

a b c

A PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama proyek ls 1.00 x 1.00 x 1.00 = 1.00

2 Pembuatan Direksikeet m2 3.00 x 6.00 x 1.00 = 18.00

3 Administrasi, Perijinan IMB dan Dokumentasi ls 1.00 x 1.00 x 1.00 = 1.00

5 Mobilisasi Alat ls 1.00 x 1.00 x 1.00 = 1.00

B HANGGAR A
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' 212.00 x 1.00 x 1.00 = 212.00

II PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 220.00 x 0.40 x 0.60 = 52.80

1 Pek. Galian Tanah untuk pondasi maks. 2 m m3 54.00 x 1.44 x 2.20 = 171.07

2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 223.87 x 0.35 x 1.00 = 78.36

3 Pek. Urugan Tanah dibawah lantai dipadatkan m3 44.00 x 66.00 x 0.20 = 580.80

4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 44.00 x 66.00 x 0.05 = 145.20

III PEKERJAAN TEMBOKAN

1 Pek. Aanstamping m3 220.00 x 0.15 x 0.50 = 16.50

1 Pek. Pondasi Batu Belah ad 1:5 m3 220.00 x 0.40 x 0.80 = 70.40

2 Pek. Pondasi Foot Plat m3 54.00 x 1.44 x 0.35 = 27.22


54.00 x 0.12 x 1.90 = 12.31
39.53

3 Pek. Sloof Beton 20/30 m3 12.00 x 40.00 x 0.06 = 28.80


4.00 x 62.00 x 0.06 = 14.88
2.00 x 10.00 x 0.06 = 1.20
44.88

4 Pas. Kolom 30/40 m3 24.00 x 0.12 x 1.00 = 2.88


30.00 x 0.12 x 2.00 = 7.20
10.08

5 Pek. Plesteran + Acian 1 : 5 kolom m2 24.00 x 1.40 x 1.00 = 33.60


kolom 30.00 x 1.40 x 2.00 = 84.00
x x = -
117.60

6 Pek. Lantai Beton m3 66.00 x 44.00 x 0.15 = 435.60


Pas. Wiremesh m2 66.00 x 44.00 x 1.00 = 2,904.00

7 Pas. Bata Merah m2 22.00 x 0.70 x 1.00 = 15.40


m2 17.00 x 0.70 x 1.00 = 11.90
27.30
4.00 x 0.70 x 1.00 = 2.80
24.50
24.50 x 48.00 x 1.00 = 1,176.00

Pas. Plesteran Acian m2 1,176.00 x 2.00 x 1.00 = 2,352.00

Pas. Kolom Praktis m3 0.01 x 0.70 x 18.00 = 0.15

0.15 x 48.00 x 1.00 = 7.32

Pas. Meja Beton m3 2.24 x 0.10 x 2.00 = 0.45


2.52 x 0.10 x 2.00 = 0.50
0.64 x 0.10 x 4.00 = 0.26
1.21

1.21 x 48.00 x 1.00 = 57.98


SAT
NO. URAIAN PEKERJAAN

a b c

Pas. Meja Keramik uk 20 x 20 cm DN m2 2.24 x 1.00 x 2.00 = 4.48


2.52 x 1.00 x 2.00 = 5.04
0.64 x 1.00 x 4.00 = 2.56
12.08

12.08 x 48.00 x 1.00 = 579.84

7 Pas. Lantai Keramik uk 40 x 40 cm DN m2 66.00 x 44.00 x 1.00 = 2,904.00

IV PEKERJAAN BAJA
1 Pas. Kolom IWF. 300.150.6.5.9 kg 30.00 x 3.00 x 36.70 = 3,303.00
16.00 x 6.00 x 36.70 = 3,523.20
8.00 x 4.60 x 36.70 = 1,350.56
8,176.76

2 Pas. Balok IWF. 250.125.6.9 kg 16.00 x 10.10 x 29.60 = 4,783.36


8.00 x 20.40 x 29.60 = 4,830.72
10.00 x 10.10 x 29.60 = 2,989.60
4.00 x 14.20 x 29.60 = 1,681.28
8.00 x 4.70 x 29.60 = 1,112.96
15,397.92

3 Pas. Balok IWF 200.100.5,5.8 kg 328.00 x 1.00 x 21.33 = 6,997.33

Pas. Balok IWF 150.75.5.7 kg 42.00 x 1.87 x 14.00 = 1,099.56


kg 16.00 x 1.42 x 14.00 = 318.08
1,417.64

4 Pas. Besi C 150.65.20.3,2 kg 26.00 x 44.00 x 7.51 = 8,591.44


26.00 x 66.00 x 7.51 = 12,887.16
26.00 x 20.00 x 7.51 = 3,905.20
25,383.80

5 Pek. Voute Balok WF 250.125.6,9 kg 64.00 x 0.50 x 29.60 = 947.20


20.00 x 0.50 x 29.60 = 296.00
8.00 x 0.50 x 29.60 = 118.40
1,361.60

WF 200.100.5,5.8 60.00 x 0.40 x 21.33 = 512.00


30.00 x 0.40 x 21.33 = 256.00
768.00

WF 150.75.5.7 28.00 x 0.30 x 14.00 = 117.60


18.00 x 0.30 x 14.00 = 75.60
193.20

6 Pas. Track Stang kg 147.00 x 22.00 x 0.89 = 2,878.26

7 Pas. Silang Angin kg 32.00 x 24.00 x 2.23 = 1,712.64

8 Pek. Erikson Baja kg x x = -

9 Pas. Base Plat kg 54.00 x 1.00 x 1.00 = 54.00

10 Pas. Baut HTB Dia. 19" kg 38.00 x 8.00 x 2.00 = 608.00


16.00 x 30.00 x 1.00 = 480.00
14.00 x 8.00 x 1.00 = 112.00
20.00 x 30.00 x 1.00 = 600.00
20.00 x 18.00 x 1.00 = 360.00
x x = -
2,160.00

V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 x x = -

VI PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk 12.00 x 8.00 x 1.00 = 96.00

2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk 48.00 x 1.00 x 1.00 = 48.00

3 Pas. Lampu TL 36 watt + aksesoris Philips & Penggantung bh x x = -

4 Pas. Stop Kontak , sek. Broco bh x x = -

5 Pas. Saklar Ganda , sek. Broco bh x x = -


SAT
NO. URAIAN PEKERJAAN

a b c
VII PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek m2 24.20 x 44.00 x 1.00 = 1,064.80
25.00 x 66.00 x 1.00 = 1,650.00
12.50 x 40.00 x 1.00 = 500.00
3,214.80

2 Pas. Bubungan m' 44.00 x 1.00 x 1.00 = 44.00

2 Pas. Listplank m' 360.00 x 1.00 x 1.00 = 360.00

3 Pas. Talang Datar m' x x = -

4 Pas. Pipa Tegak 3' m' x x = -

Pas. Dinding Spandek m2 2.60 x 10.00 x 4.00 = 104.00


1.20 x 42.00 x 2.00 = 100.80

C HANGGAR B
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' x x = -
Sub Jumlah x x = -
II PEKERJAAN TANAH x x = -
1 Pek. Galian Tanah untuk pondasi maks. 2 m m3 x x = -
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x x = -
Sub Jumlah x x = -
III PEKERJAAN TEMBOKAN x x = -
1 Pek. Pondasi Foot Plat m3 x x = -
2 Pek. Sloof Beton 15/20 m3 x x = -
3 Pas. Kolom 25/30 m3 x x = -
4 Pek. Plesteran + Acian 1 : 5 m2 x x = -
5 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x x = -
6 Pas. Batu Tempel m2 x x = -
Sub Jumlah x x = -
IV PEKERJAAN BAJA x x = -
1 Pas. Kolom IWF. 200.100.5.5.8 kg x x = -
2 Pas. Balok IWF. 200.100.5,5.8 kg x x = -
3 Pas. Balok IWF. 150.75.5.7 kg x x = -
4 Pas. Besi C 125.50.20.2,3 kg x x = -
5 Pek. Plat Stepner kg x x = -
6 Pas. Track Stang kg x x = -
7 Pas. Silang Angin kg x x = -
8 Pek. Erikson Baja kg x x = -
9 Pas. Base Plat kg x x = -
10 Pas. Baut HTB Dia. 19" kg x x = -
x x = -
V PEKERJAAN PENGECATAN x x = -
1 Pek. Pengecatan Dinding 3x m2 x x = -
Sub Jumlah x x = -
VI PEKERJAAN LISTRIK x x = -
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk x x = -
3 Pas. Lampu TL 36 watt + aksesoris Philips & Penggantung bh x x = -
4 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh x x = -
5 Pas. Saklar Ganda , sek. Broco bh x x = -
Sub Jumlah x x = -
VII PEKERJAAN PENUTUP ATAP x x = -
1 Pas. Atap Spandek m2 x x = -
2 Pas. Listplank m' x x = -
3 Pas. Talang Datar m' x x = -
4 Pas. Pipa Tegak 3' m' x x = -
Sub Jumlah x x = -
D HANGGAR C x x = -
I PEKERJAAN PERSIAPAN x x = -
1 Pek. Pengukuran Dan Bouwplank m' x x = -
Sub Jumlah x x = -
II PEKERJAAN TANAH x x = -
1 Pek. Galian Tanah untuk pondasi maks. 2 m m3 x x = -
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x x = -
3 Pek. Urugan Tanah dibawah lantai dipadatkan m3 x x = -
4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x x = -
Sub Jumlah x x = -
SAT
NO. URAIAN PEKERJAAN

a b c
III PEKERJAAN TEMBOKAN x x = -
1 Pek. Pondasi Foot Plat m3 x x = -
2 Pek. Sloof Beton 15/20 m3 x x = -
3 Pas. Kolom 25/30 m3 x x = -
4 Pek. Plesteran + Acian 1 : 5 m2 x x = -
5 Pek. Lantai Kerja Beton Beton Tumbuk m3 x x = -
6 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x x = -
Sub Jumlah x x = -
IV PEKERJAAN BAJA x x = -
1 Pas. Kolom IWF. 200.100.5.5.8 kg x x = -
2 Pas. Balok IWF. 200.100.5,5.8 kg x x = -
3 Pas. Balok IWF. 150.75.5.7 kg x x = -
4 Pas. Besi C 125.50.20.2,3 kg x x = -
5 Pek. Plat Stepner kg x x = -
6 Pas. Track Stang kg x x = -
7 Pas. Silang Angin kg x x = -
8 Pek. Erikson Baja kg x x = -
9 Pas. Base Plat kg x x = -
10 Pas. Baut HTB Dia. 19" kg x x = -
x x = -
V PEKERJAAN PENGECATAN x x = -
1 Pek. Pengecatan Dinding 3x m2 x x = -
Sub Jumlah x x = -
VI PEKERJAAN LISTRIK x x = -
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk x x = -
3 Pas. Lampu TL 36 watt + aksesoris Philips & Penggantung bh x x = -
4 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh x x = -
5 Pas. Saklar Ganda , sek. Broco bh x x = -
Sub Jumlah x x = -
VII PEKERJAAN PENUTUP ATAP x x = -
1 Pas. Atap Spandek m2 x x = -
2 Pas. Listplank m' x x = -
3 Pas. Talang Datar m' x x = -
4 Pas. Pipa Tegak 3 " m' x x = -
Sub Jumlah x x = -
E HANGGAR D x x = -
I PEKERJAAN PERSIAPAN x x = -
1 Pek. Pengukuran Dan Bouwplank m' x x = -
Sub Jumlah x x = -
II PEKERJAAN TANAH x x = -
1 Pek. Galian Tanah untuk pondasi maks. 2 m m3 x x = -
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x x = -
3 Pek. Urugan Tanah dibawah lantai dipadatkan m3 x x = -
4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x x = -
Sub Jumlah x x = -
III PEKERJAAN TEMBOKAN x x = -
1 Pek. Pondasi Foot Plat m3 x x = -
2 Pek. Sloof Beton 15/20 m3 x x = -
3 Pas. Kolom 25/30 m3 x x = -
4 Pek. Plesteran + Acian 1 : 5 m2 x x = -
5 Pek. Lantai Kerja Beton Beton Tumbuk m3 x x = -
6 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x x = -
Sub Jumlah x x = -
SAT
NO. URAIAN PEKERJAAN

a b c
IV PEKERJAAN BAJA x x = -
1 Pas. Kolom IWF. 200.100.5.5.8 kg x x = -
2 Pas. Balok IWF. 175.90.5.8 kg x x = -
3 Pas. Balok IWF. 150.75.5.7 kg x x = -
4 Pas. Besi C 125.50.20.2,3 kg x x = -
5 Pek. Plat Stepner kg x x = -
6 Pas. Track Stang kg x x = -
7 Pas. Silang Angin kg x x = -
8 Pek. Erikson Baja kg x x = -
9 Pas. Base Plat kg x x = -
10 Pas. Baut HTB Dia. 19" kg x x = -
x x = -
V PEKERJAAN PENGECATAN x x = -
1 Pek. Pengecatan Dinding 3x m2 x x = -
Sub Jumlah x x = -
VI PEKERJAAN LISTRIK x x = -
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk x x = -
3 Pas. Lampu TL 36 watt + aksesoris Philips & Penggantung bh x x = -
4 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh x x = -
5 Pas. Saklar Ganda , sek. Broco bh x x = -
Sub Jumlah x x = -
VII PEKERJAAN PENUTUP ATAP x x = -
1 Pas. Atap Spandek m2 x x = -
2 Pas. Bubungan m2 x x = -
Sub Jumlah x x = -
F HANGGAR E x x = -
I PEKERJAAN PERSIAPAN x x = -
1 Pek. Pengukuran Dan Bouwplank m' x x = -
2 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x x = -
Sub Jumlah x x = -
II PEKERJAAN TEMBOKAN x x = -
1 Pek. Sloof Beton 15/20 m3 x = -
2 Pas. Kolom Praktis m3 x = -
3 Pas. Ringbalok m3 x = -
4 Pas. Bata Merah m2 x = -
5 Pek. Plesteran + Acian 1 : 5 m2 x = -
6 Pek. Plat Decker m3 x = -
7 Pas. Lantai Keramik uk 40 x 40 cm DN m3 x = -
Sub Jumlah x = -
III PEKERJAAN PENGECATAN x = -
1 Pek. Pengecatan Dinding 3x m2 x =
Sub Jumlah x =
G PEKERJAAN BANGUNAN PENUNJANG x =
I PEKERJAAN GAZEBO x =
1 Pek. Pengukuran Dan Bouwplank m' x =
2 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x =
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x =
4 Pek. Urugan Tanah dibawah lantai dipadatkan m3 x =
5 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x =
6 Pas. Aanstamping m3 x =
7 Pek. Pondasi Batu Belah ad 1:5 m3 x =
8 Pek. Sloof Beton 15/20 m3 x =
9 Pas. Kolom Praktis m3 x =
10 Pas. Ringbalok m3 x =
11 Pas. Bata Merah m2 x =
12 Pek. Plesteran + Acian 1 : 5 m2 x =
13 Pek. Lantai Rabat Beton ad 1:3:5 + acian m3 x =
SAT
NO. URAIAN PEKERJAAN

a b c
14 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x =
15 Pas. Rangka Plafond Besi Hollow m2 x =
16 Pas. Penutup Plapond GRC m2 x =
17 Pek. Pengecatan Dinding 3x m2 x =
18 Pek. Pengecatan Plafond 3x m2 x =
19 Pas. Rangka Atap Baja Ringan m2 x =
20 Pas. Penutup Atap Genteng Metal m2 x =
21 Pas. Bubungan m' x
Sub Jumlah x
II PEKERJAAN PERGOLA 2 UNIT x
1 Pek. Pengukuran Dan Bouwplank m' x
2 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x
4 Pek. Urugan Tanah dibawah lantai dipadatkan m3 x
5 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x
6 Pas. Aanstamping m3 x
7 Pek. Pondasi Batu Belah ad 1:5 m3 x
8 Pek. Sloof Beton 15/20 m3 x
9 Pas. Kolom Praktis m3 x
10 Pas. Bata Merah m2 x
11 Pek. Plesteran + Acian 1 : 5 m2 x
12 Pek. Lantai Rabat Beton ad 1:3:5 + acian m3 x
13 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x
14 Pek. Pengecatan Dinding 3x m2 x
15 Pek. Pengecatan Besi 3x m2 x
16 Pas. Rangka Atap Besi Pipa x
- Pipa BSP 3" m' x
- Pipa BSP 2" m' x
- Pas. Wiremesh M8 m2 x
Sub Jumlah x
III PEKERJAAN TANGGA x
1 Pek. Pengukuran Dan Bouwplank m' x
2 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x
4 Pek. Pondasi Batu Belah ad 1:5 m3 x
5 Pek. Plesteran Siar m2 x
6 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x
Sub Jumlah x
IV PEKERJAAN PAGAR x
1 Pek. Pengukuran Dan Bouwplank m' x
2 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x
4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x
5 Pek. Pondasi Beton Tumbuk ad 1:5 m3 x
6 Pas. Kolom 20/20 m3 x
7 Pek. Plester Acian Kolom m2 x
8 Pas. Pagar Besi Hollow Finish Cat m'
Sub Jumlah
V PEKERJAAN LAPANGAN PARKIR, PEDESTRIAN DAN SALURAN AIR HUJAN
1 Pek. Striping Tanah m2
2 Pas. Paving Block m3
3 Pas. Saluran Air Hujan Gravel 1/2 dia. 20 cm m'

Sub Jumlah
HITUNGAN VOLUME
UKURAN
PANJANG 36.00
LEBAR 17.00

BOUWPLANK 114.00 x 1.00 x 1.00 = 114.00


x x = -
114.00

CUT & FILL 30.00 x 45.00 x 1.75 = 2,362.50

GALIAN pondasi lajur x x = -


foot plat 32.00 x 2.25 x 2.50 = 180.00
4.00 x 1.00 x 1.50 = 6.00
= 186.00

URUGAN bekas galian 186.00 x 0.65 x 1.00 = 120.90


peninggian lantai x x = -
pasir urug 17.00 x 36.00 x 0.05 = 30.60

AANSTAMPING x x = -

PONDASI

Aanstamping 42.00 x 0.90 x 0.15 = 5.67

Pondasi batu kali 42.00 x 0.50 x 0.70 = 14.70


x x = -

Foot Plat 32.00 x 2.25 x 0.35 = 25.20


32.00 x 0.25 x 2.15 = 17.20
4.00 x 1.00 x 0.30 = 1.20
4.00 x 0.04 x 1.20 = 0.19
43.79

SLOOF 280 x 0.30 x 0.40 = 33.60


61.00 x 0.15 x 0.20 = 1.83

LANTAI KERJA BASEMENT 17.00 x 36.00 x 0.05 = 30.60

KOLOM 50 X 50 32.00 x 0.25 x 4.00 = 32.00

20 X 20 4.00 x 0.04 x 4.00 = 0.64

BALOK 25 x 50 149.00 x 0.25 x 0.50 = 18.63

25 x 50 136.00 x 0.25 x 0.50 = 17.00


35.63

15 x 30 85.00 x 0.15 x 0.30 = 3.83

15 x 30 108.00 x 0.15 x 0.30 = 4.86


8.69

PLAT LANTAI BETON 17.00 x 36.00 x 0.12 = 73.44

PLAT TANGGA BETON 12.00 x 2.00 x 0.13 = 3.12

Pas Bata 148.00 x 4.00 1.00 592.00

P1 2.00 x 1.50 2.20 6.60


P2 x -
P3 6.00 x 0.80 2.10 10.08
P4 x -
P5 x -
J1 x -
J2 6.00 x 1.20 1.80 12.96
J3 15.00 x 1.80 1.80 48.60
BV1 8.00 x 0.50 0.60 2.40
BV2 x
BV3 x
80.64

Pas Plesteran Bata 511.36 x 2.00 1.00 1,022.72

PAS. LANTAI KERAMIK 20 X 20 27.00 x 1.00 x 1.00 = 27.00

PAS. KERAMIK 20 x 25 78.60 x 1.00 x 1.00 = 78.60

PAS. KERAMIK 40 x 40 36.00 x 17.00 x 1.00 = 612.00


27.00
585.00

LANTAI KERJA T = 5 CM 36.00 x 17.00 x 0.10 = 61.20


x x = -
61.20

LANTAI 2

KOLOM 50 X 50 28.00 x 0.25 x 3.50 = 24.50

35 X 35 - x 0.12 x 3.50 = -

BALOK 25 x 50 141.00 x 0.25 x 0.50 = 17.63

25 x 50 125.00 x 0.25 x 0.50 = 15.63

15 x 30 204.00 x 0.25 x 0.50 = 25.50

LANTAI 17.00 x 34.00 x 0.13 = 75.14

PAS. KERAMIK 30 x 30 34.00 x 17.00 x 1.00 = 578.00


x x = -
578.00

LANTAI KERJA T = 5 CM 34.00 x 17.00 x 0.05 = 28.90


x x = -
28.90

PEK. BAJA

KUDA- KUDA WF. 250.125.6.9 20.00 x 12.00 x #REF! = #REF!


WF. 200.100.5.5.8 20.00 x 2.00 x 21.33 = 853.33
WF. 150.75.5.7 10.00 x 5.60 x 14.00 = 784.00

GORDENG C. 150.65.20.3,2 56.00 x 24.00 x 7.51 = 10,093.44

ATAP 56.00 x 15.35 x 2.00 = 1,719.20


1,719.20

BoQ - Pembangunan Gedung Kwarcab Pramuka Cianjur Hit Volum - hal 77 dari 98
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN KANTOR DINAS KEPENDUDUKAN DAN CATATAN SIPIL
KABUPATEN CIANJUR
SATKER : DINAS KEPENDUDUKAN DAN CATATAN SIPIL
LOKASI : KECAMATAN CIANJUR
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2015

VOLUME HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

A PEKERJAAN PERSIAPAN
1 Pengukuran & Pasang Bouwplank 114.00 ls #NAME? #NAME?
2 Pembuatan Dreksikeet 1.00 ls 5,000,000.00 5,000,000.00
3 Mobilisasi Alat Dan Bahan 1.00 ls 15,000,000.00 15,000,000.00
4 Administrasi, Perijinan Dan Dokumentasi 1.00 ls 5,000,000.00 5,000,000.00
5 Pengadaan Listrik Kerja 1.00 ls 2,000,000.00 2,000,000.00
6 Pengadaan Air Kerja 1.00 ls 2,000,000.00 2,000,000.00
7 Pas. Pagar Pengaman Proyek 63.00 m' #NAME? #NAME?
8 Pembersihan Area Bekas Pekerjaan 1.00 ls 2,000,000.00 2,000,000.00
Sub Jumlah #NAME?
B LANTAI BASEMENT
I PEKERJAAN TANAH
1 Pek. Urugan Tanah 2,400.00 m3 145,000.00 348,000,000.00
2 Pek. Galian Tanah 186.00 m3 69,300.00 12,889,800.00
3 Pek. Urugan Tanah Kembali 65.10 m3 41,250.00 2,685,375.00
4 Pek. Urugan Tanah Peninggian Lantai ( Tinggi 20 cm ) 124.10 m3 41,250.00 5,119,125.00
5 Pek. Urugan Pasir Bawah Pondasi Batu Kali 31.03 m3 #NAME? #NAME?
-
Sub Jumlah #NAME?
II PEKERJAAN BETON DAN TEMBOKAN
1 Aanstamping Batu Kali ( 1: 5 ) 2.40 m3 #NAME? #NAME?
2 Pondasi Batu Kali ( 1 : 5 ) 14.30 m3 #NAME? #NAME?
3 Pondasi Setempat uk. 150 x 150 cm 25.50 m3 #NAME? #NAME?
4 Kolom Pedestal uk. 50/50 17.39 m3 #REF! #REF!
5 Sloof BS1 ( 20/40 ) 33.60 m3 #NAME? #NAME?
6 Kolom uk. 50/50 #REF! m3 #REF!
7 Kolom uk. 30/30 0.64 m3 #NAME?
8 Dinding Beton t = 15 cm 31.80 m3 -
9 Lantai Beton t = 12 cm 73.44 m3 #NAME? #NAME?
10 Lantai Basement Beton t = 20 cm 122.40 m3 -
11 Pas.Dinding 1/2 Bata ( 1 : 5 ) 212.00 m2 #NAME?
12 Plesteran dan aci ( 1 : 5 ) 424.00 m2 #NAME?
13 Acian Kolom Exposed 126.00 m2 30,410.00
14 Kolom Praktis uk. 12/12 cm 0.32 m3 #NAME?
15 Pas. Lantai Keramik uk. 20 x 20 cm 4.50 m2 #NAME?
16 Pas. Dinding Keramik uk. 20 x 25 cm 15.60 m2 214,036.00
17 Pek. Floor Hardner 578.00 m2 55,000.00
18 Pas. Grevel Saluran U 20 cm 70.00 m' #REF! #REF!
19 Pas. Bak Kontrol Pasangan Bata 30 x 30 cm 4.00 bh #NAME? #NAME?
20 Pas. Saluran L = 40 cm + Plat Decker 12.00 m' 1,006,266.00 12,075,192.00

Sub Jumlah #REF!

III PEK. ELEKTRIKAL


1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 12.00 Titik 165,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 2.00 Titik 165,000.00
3 Pas. Lampu TL 12.00 bh 225,000.00
4 Saklar Tunggal 2.00 bh 50,600.00
5 Saklar Ganda 4.00 bh 50,600.00
6 Stop Kontak 2.00 bh 50,600.00

Hal 78
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

7 Pas. Panel (Panel SDF, Panel AC, Panel Fire Alrm) 1.00 unit 35,000,000.00 35,000,000.00
8 #REF! 1.00 ls #REF! #REF!
9 #REF! 1.00 ls #REF! #REF!
10 BP Listrik 1.00 ls 25,000,000.00 25,000,000.00

Sub Jumlah #REF!

IV PEKERJAAN SANITARY -
1 Pas. Closet Jongkok 2.00 bh #REF!
2 Pas. Floor Drain Stainles 2.00 bh #REF!
3 Pas. Wastafel 1.00 bh 950,000.00
4 Pas. Bak Mandi Fiber uk. 60 x 60 motif 2.00 bh #REF!
5 Pas. Kran Air dia. 1/2" 2.00 bh #REF!
6 Pas. Instalasi Air Kotor Pipa PVC dia 4" 8.00 m1 #REF!
7 Pas. Instalasi Air Bersih Pipa PVC dia 1/2" 24.00 m1 #REF!
8 Pas. Ground Tank 1.00 unit 30,000,000.00
9 Pas. Pompa Air 2.00 unit 2,500,000.00
10 Pas. Sumur Bor 1.00 unit 7,000,000.00
11 Pas. Septicktank 1,5 x 1 x 1,5 m + Rembesan 2.00 unit 7,500,000.00
-

Sub Jumlah -
C LANTAI 1
I PEKERJAAN BETON DAN TEMBOKAN
1 Balok 25/50 35.63 m3 - -
2 Balok 15/30 3.83 m3 - -
3 Kolom uk. 50/50 32.00 m3 - -
4 Kolom uk. 30/30 0.64 m3 #NAME? #NAME?
5 Lantai Beton t = 12 cm 73.44 m3 #NAME? #NAME?
6 Pas.Dinding 1/2 Bata ( 1 : 5 ) 414.40 m2 #NAME? #NAME?
7 Plesteran dan aci ( 1 : 5 ) 828.80 m2 #NAME? #NAME?
8 Acian Kolom Exposed 196.00 m2 30,410.00 5,960,360.00
9 Kolom Praktis uk. 12/12 cm 1.97 m3 #NAME? #NAME?
10 Topi Beton t = 7 cm 1.32 m3 #NAME? #NAME?
11 Balok Lintel 1.91 m3 - -
12 Meja Beton Los 0.13 m3 #NAME? #NAME?
12 Lantai Keramik uk. 30 x 30 cm 598.55 m2 #NAME? #NAME?
13 Pas. Lantai Keramik uk. 20 x 20 cm 20.25 m2 #NAME? #NAME?
14 Pas. Dinding Keramik uk. 20 x 25 cm 63.60 m2 #REF! #REF!
15 Lantai Kerja tebal = 5 cm 30.94 m3 #NAME? #NAME?

Sub Jumlah #NAME?

II PEK. PENGECATAN
1 Pengecatan Dinding 1,024.80 m2 #NAME? #NAME?
2 Pengecatan Plafond 612.00 m2 #NAME? #NAME?

Sub Jumlah #NAME?

III PEK. ALUMUNIUM


1 Pas. Kusen Pintu Alumunium P1 Warna 4" 2.00 Unit 12,500,000.00 25,000,000.00
2 Pas. Kusen Pintu Alumunium P2 Warna 4" 3.00 Unit 4,200,000.00 12,600,000.00
3 Pas. Kusen Pintu Alumunium P3 Warna 4" 13.00 Unit 2,650,000.00 34,450,000.00
4 Pas. Kusen Pintu Alumunium P4 Warna 4" 7.00 Unit 1,800,000.00 12,600,000.00
5 Pas. Kusen Jendela Alumunium J2 Warna 4" 21.00 Unit 2,950,000.00 61,950,000.00
6 Pas. Kusen Bouvenlight Alumunium BV2 Warna 4" 7.00 Unit 950,000.00 6,650,000.00
7 Pas. Railling Tangga 7.60 m' 550,000.00 4,180,000.00

Sub Jumlah 157,430,000.00

IV PEK. PARTISI DAN PLAFOND


1 Pas. Rangka Dinding Partisi Gypsum 66.00 m2 #VALUE! #VALUE!

Hal 79
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

2 Pas. Penutup Dinding Gypsum 9 mm 66.00 m2 - -


3 Pek. Rangka Plafond Besi Hollow 612.00 m2 - -
4 Pas. Penutup Plafond Gypsum 9 mm 591.75 m2 - -
5 Pas. Penutup Plafond GRC 4 mm 20.25 m2 - -
6 Pek. List Plafond 227.00 m' - -

Sub Jumlah #REF!

V PEK. ELEKTRIKAL
1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 47.00 Titik 165,000.00 7,755,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 16.00 Titik 165,000.00 2,640,000.00
3 Pas. Lampu RM 2x 20 watt 18.00 bh 350,000.00 6,300,000.00
4 Pas. Lampu Down Light 29.00 bh 175,000.00 5,075,000.00
5 Saklar Tunggal 11.00 bh 50,600.00 556,600.00
6 Saklar Ganda 18.00 bh 50,600.00 910,800.00
7 Stop Kontak 16.00 bh 50,600.00 809,600.00
8 Pas. AC 11.00 unit 6,500,000.00 71,500,000.00

Sub Jumlah #REF!

VI PEKERJAAN SANITARY -
1 Pas. Closet Jongkok 3.00 bh #REF! #REF!
2 Pas. Closet Duduk 4.00 bh 2,500,000.00 10,000,000.00
3 Pas. Floor Drain Stainles 7.00 bh #REF! #REF!
4 Pas. Wastafel 3.00 bh 950,000.00 2,850,000.00
5 Pas. Bak Mandi Fiber uk. 60 x 60 motif 7.00 bh #REF! #REF!
6 Pas. Kran Air dia. 1/2" 12.00 bh #REF! #REF!
7 Pas. Kitchenzink 1.00 bh #REF! #REF!
8 Pas. Instalasi Air Kotor Pipa PVC dia 4" 56.00 m1 #REF! #REF!
9 Pas. Instalasi Air Bersih Pipa PVC dia 1/2" 84.00 m1 #REF! #REF!

Sub Jumlah #REF!


D LANTAI 2
I PEKERJAAN BETON DAN TEMBOKAN
2 Balok 15/30 0.90 m3 - -
3 Kolom uk. 50/50 32.00 m3 - -
4 Kolom uk. 30/30 0.64 m3 #NAME? #NAME?
5 Dak Beton t = 10 cm 10.00 m3 #NAME? #NAME?
6 Pas.Dinding 1/2 Bata ( 1 : 5 ) 414.40 m2 #NAME? #NAME?
7 Plesteran dan aci ( 1 : 5 ) 828.80 m2 #NAME? #NAME?
8 Acian Kolom Exposed 196.00 m2 30,410.00 5,960,360.00
9 Kolom Praktis uk. 12/12 cm 1.97 m3 #NAME? #NAME?
10 Ringbalok RB1 ( 15/25 ) 8.51 m3 #NAME? #NAME?
11 Balok Lintel 1.91 m3 - -
12 Topi Beton t = 7 cm 1.26 m3 - -
13 Meja Beton Los 0.13 m3 #NAME? #NAME?
14 Lantai Keramik uk. 30 x 30 cm 598.55 m2 #NAME? #NAME?
15 Pas. Lantai Keramik uk. 20 x 20 cm 20.25 m2 #NAME? #NAME?
16 Pas. Dinding Keramik uk. 20 x 25 cm 63.60 m2 #REF! #REF!
17 Lantai Kerja tebal = 5 cm 30.94 m3 #NAME? #NAME?

Sub Jumlah #NAME?

II PEK. PENGECATAN
1 Pengecatan Dinding 1,024.80 m2 #NAME? #NAME?
2 Pengecatan Plafond 612.00 m2 #NAME? #NAME?
3 Pengecatan Kayu 31.80 m2 #NAME? #NAME?

Sub Jumlah #NAME?

III PEK. BESI DAN ALUMUNIUM

Hal 80
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

1 Pas. Kusen Pintu Alumunium P2 Warna 4" 3.00 Unit 4,200,000.00 12,600,000.00
2 Pas. Kusen Pintu Alumunium P3 Warna 4" 9.00 Unit 2,650,000.00 23,850,000.00
3 Pas. Kusen Pintu Alumunium P4 Warna 4" 5.00 Unit 1,800,000.00 9,000,000.00
4 Pas. Kusen Jendela Alumunium J2 Warna 4" 20.00 Unit 2,950,000.00 59,000,000.00
5 Pas. Kusen Bouvenlight Alumunium BV2 Warna 4" 5.00 Unit 950,000.00 4,750,000.00
6 Pas. Railling Tangga 7.60 m' 550,000.00 4,180,000.00

Sub Jumlah 113,380,000.00

IV PEK. ATAP
1 Pas. Kuda kuda Baja Ringan 656.03 m2 175,000.00 114,805,250.00
2 Pas. Penutup Atap Genteng Morando 656.03 m2 - -
3 Pas. Bubungan 62.00 m2 - -
4 Pas. Listplank 106.00 m' #REF! #REF!

Sub Jumlah #REF!

V PEK. KAYU DAN PLAFOND


1 Pas. Rangka Dinding Partisi Gypsum 66.00 m2 #VALUE! #VALUE!
2 Pas. Penutup Dinding Gypsum 9 mm 66.00 m2 - -
3 Pek. Rangka Plafond Besi Hollow 612.00 m2 - -
4 Pas. Penutup Plafond Gypsum 9 mm 591.75 m2 - -
5 Pas. Penutup Plafond GRC 4 mm 20.25 m2 - -
6 Pek. List Plafond 227.00 m' - -

Sub Jumlah #VALUE!

VI PEK. ELEKTRIKAL
1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 47.00 Titik 165,000.00 7,755,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 16.00 Titik 165,000.00 2,640,000.00
3 Pas. Lampu RM 2x 20 watt 18.00 bh 350,000.00 6,300,000.00
4 Pas. Lampu Down Light 29.00 bh 175,000.00 5,075,000.00
5 Saklar Tunggal 11.00 bh 50,600.00 556,600.00
6 Saklar Ganda 18.00 bh 50,600.00 910,800.00
7 Stop Kontak 16.00 bh 50,600.00 809,600.00
8 Pas. AC 16.00 unit 6,500,000.00 104,000,000.00
9 Penangkal Petir 1.00 unit #REF! #REF!

Sub Jumlah #REF!

VII PEKERJAAN SANITARY -


1 Pas. Closet Jongkok 3.00 bh #REF! #REF!
2 Pas. Closet Duduk 4.00 bh 2,500,000.00 10,000,000.00
3 Pas. Floor Drain Stainles 7.00 bh #REF! #REF!
4 Pas. Wastafel 3.00 bh 950,000.00 2,850,000.00
5 Pas. Bak Mandi Fiber uk. 60 x 60 motif 7.00 bh #REF! #REF!
6 Pas. Kran Air dia. 1/2" 12.00 bh #REF! #REF!
7 Pas. Kitchenzink 1.00 bh #REF! #REF!
8 Pas. Instalasi Air Kotor Pipa PVC dia 4" 56.00 m1 #REF! #REF!
9 Pas. Instalasi Air Bersih Pipa PVC dia 1/2" 112.00 m1 #REF! #REF!
10 Pas. Water Torn Kapasitas 1000 ltr + Rangka 2.00 unit 3,000,000.00 6,000,000.00

Sub Jumlah #REF!

Hal 81
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5

Hal 82
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN KANTOR DINAS KEPENDUDUKAN DAN CATATAN SIPIL
KABUPATEN CIANJUR
SATKER : DINAS TATA RUANG DAN PERMUKIMAN
LOKASI : KECAMATAN CIANJUR
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016

JUMLAH HARGA
NO URAIAN PEKERJAAN PEKERJAAN
( Rp )
(a) (b)

A PEKERJAAN PERSIAPAN #NAME?


B LANTAI 1
I PEKERJAAN TANAH #NAME?
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! -

#REF! #REF!
II PEKERJAAN BETON DAN TEMBOKAN #NAME?
III PEK. PENGECATAN #NAME?
IV PEK. ALUMUNIUM 157,430,000.00
V PEK. PARTISI DAN PLAFOND #REF!
VI PEK. ELEKTRIKAL #REF!
VII PEKERJAAN SANITARY #REF!

D LANTAI 2
I PEKERJAAN BETON DAN TEMBOKAN #NAME?
II PEK. PENGECATAN #NAME?
III PEK. BESI DAN ALUMUNIUM 113,380,000.00
IV PEK. ATAP #REF!
V PEK. KAYU DAN PLAFOND #VALUE!
VI PEK. ELEKTRIKAL #REF!
VII PEKERJAAN SANITARY #REF!

TOTAL #NAME?
PPN 10 % #NAME?
JUMLAH TOTAL #NAME?
DIBULATKAN #NAME?
Terbilang : ###

#NAME?

###

###

###

Cianjur, Mei 2015


Mengetahui Dibuat
Pejabat Pembuat Komitmen Konsultan Perencana
Dinas Perindustrian CV. RAHFINDO CIPTA ENGINEERING
Dan Perdagangan Kab. Cianjur

NANA RUKMANA, SE Ir. RAHMAT HIDAYAT


NIP. 19650925 199302 1 001 Direktur
HITUNGAN VOLUME PEKERJAAN
KEGIATAN : PEMBANGUNAN GEDUNG DAN REVITALISASI PUSKESMAS MAMPU PONED
PEKERJAAN : PEMBANGUNAN PUSKESMAS SUKARESMI
SATKER : DINAS KESEHATAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016

SAT
NO. URAIAN PEKERJAAN

a b c
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' 76.00 x 1.00 x 1.00 = 76.00
2 Pembuatan Papan Nama proyek ls 1.00 x 1.00 x 1.00 = 1.00
3 Sewa Direksikeet ls 1.00 x 1.00 x 1.00 = 1.00
4 Administrasi, Perijinan dan Dokumentasi ls 1.00 x 1.00 x 1.00 = 1.00
5 Bongkaran ls 1.00 x 1.00 x 1.00 = 1.00
6 Pengupasam Lahan ls 25.00 x 18.00 x 1.00 = 450.00
Sub Jumlah x x = -
B PEKERJAAN LANTAI I x x = -
I PEKERJAAN TANAH x x = -
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 65.00 x 1.00 x 1.00 = 65.00

Pek. Galian Tanah untuk pondasi footplat maks. 2 m m3 38.00 1.44 2.00 109.44

2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 174.44 x 0.35 x 1.00 = 61.05

3 Pek. Urugan Tanah dibawah lantai dipadatkan m3 15.00 x 23.00 x 0.20 = 69.00

4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 15.00 x 23.00 x 0.05 = 17.25
Sub Jumlah x x = -
II PEKERJAAN TEMBOKAN x x = -
1 Pas. Aanstamping m3 65.00 x 0.15 x 1.00 = 9.75

2 Pek. Pondasi Batu Kali ad 1:5 m3 65.00 x 0.55 x 0.80 = 28.60

3 Pek. Pondasi Foot Plat m3 32.00 x 1.44 x 0.25 = 11.52


32.00 0.09 1.75 5.04
6.00 1.00 0.25 1.50
6.00 0.04 1.25 0.30
16.56

1 Pek. Sloof Beton 15/20 m3 65.00 x 0.20 x 0.15 = 1.95

4 Pek. Sloof Beton 20/30 m3 92.50 x 0.20 x 0.30 = 5.55

5 Pek. Kolom Praktis 12/12 m3 20.00 x 0.01 x 3.70 = 1.07

5 Pas. Kolom 20/20 m3 6.00 x 0.04 x 3.70 = 0.89

6 Pas. Kolom 30/30 m3 32.00 x 0.09 x 3.70 = 10.66

7 Pas. Balok Beton 20/40 m3 88.00 x 0.20 x 0.40 = 7.04

8 Pas. Balok Beton 15/30 m3 84.00 x 0.15 x 0.30 = 3.78


66.00 x 0.15 x 0.30 = 2.97
11.50 x 0.15 x 0.30 = 0.52
39.00 x 0.15 x 0.30 = 1.76
9.02

9 Pek. Plat Lantai Beton BONDEK m3 231.00 x 0.12 x 1.00 = 27.72


BIASA 39.00 x 0.10 x 1.00 = 3.90
TRITISAN 1 M 24.00 x 0.10 x 1.00 = 2.40
VOID 12.00 x 0.12 x 1.00 = 1.44
32.58
Pek. Listplank beton m3 24.00 x 0.05 x 0.40 = 0.48
SAT
NO. URAIAN PEKERJAAN

a b c

10 Pek. Plat Tangga Beton m3 15.75 x 0.12 x 1.00 = 1.89

11 Pek. Balok/Ringbalk beton bertulang 15/20 m3 x x = -

12 Pek. Meja Beton m3 7.00 x 0.60 x 0.10 = 0.42

13 Pek. Balok Lintel 12/15 m3 44.20 x 0.12 x 0.15 = 0.80

14 Pek. Dinding Bata 1 : 5 m2 189.50 x 3.70 x 1.00 = 701.15


616.27
PG 1 2.60 x 2.30 x 1.00 = 5.98
P1 2.60 x 1.50 x 3.00 = 11.70
P2 2.60 x 0.90 x 12.00 = 28.08
P3 2.60 x 0.80 x 2.00 = 4.16
P4 2.10 x 0.80 x 4.00 = 6.72
J1 2.40 x 0.70 x 1.00 = 1.68
J2 1.55 x 1.35 x 11.00 = 23.02
J4 1.10 x 0.70 x 1.00 = 0.77
BV 1 0.50 x 0.70 x 3.00 = 1.05
BV 2 0.50 x 1.15 x 3.00 = 1.73
BV 3 0.50 x 2.00 x - = -
84.88

15 Pek. Plesteran + Acian 1 : 5 m2 616.27 x 2.00 x 1.00 = 1,232.54

16 Pek. Lantai Rabat Beton ad 1:3:5 + acian m3 x x = -

17 Pas. Lantai Keramik uk 20 x 20 cm DN m2 1.50 x 4.00 x 1.00 = 6.00


2.00 1.50 1.00 3.00
3.00 1.50 1.00 4.50
13.50

18 Pas. Lantai Keramik uk 40 x 40 cm DN m2 11.00 x 21.00 x 1.00 = 231.00


3.00 9.00 1.00 27.00
24.00 1.00 1.00 24.00
282.00
13.50
268.50

19 Pas. Dinding Keramik uk 20 x 25 cm DN m2 5.80 x 1.50 x 3.00 = 26.10


RUANG KIA 17.30 1.50 1.00 25.95
RUANG IGD 14.60 1.50 1.00 21.90
73.95

20 Pas. Hospital Plint m' x x = -

21 Pas. Batu Tempel m2 x x = -


Sub Jumlah x x = -
III PEKERJAAN PLAFOND x x = -
1 Pas. Dinding Partisi Gypsum m2 x x = -

1 Pek. Plafond Gypsum 9 mm, + R.Hollow m2 21.00 x 11.00 x 1.00 = 231.00


3.00 4.00 1.00 12.00
3.00 9.00 1.00 27.00
270.00

2 Pek. Plafond GRC 4 mm + rangka Hollow m2 1.50 x 2.00 x 3.00 = 9.00


1.00 x 3.00 x 2.00 = 6.00
20.00 x 0.50 x 1.00 = 10.00
25.00

3 Pek. List Plafond Gypsum m1 433.00 x 1.00 x 1.00 = 433.00


SAT
NO. URAIAN PEKERJAAN

a b c
3 Pek. List Plafond Kayu m1 81.00 x 1.00 x 1.00 = 81.00

5 Pas. Kayu Bagian Bawah (Kusen) , kayu klas II m3 x x = -


Sub Jumlah x x = -
IV PEKERJAAN ALUMUNIUM x x = -
1 Pas. Pintu type PG1, Alumuium 4" Silver unit 1.00 x 1.00 x 1.00 = 1.00
2 Pas. Pintu type P1, Alumuium 4" Silver unit 3.00 x 1.00 x 1.00 = 3.00
3 Pas. Pintu type P2, Alumuium 4" Silver unit 12.00 x 1.00 x 1.00 = 12.00
4 Pas. Pintu type P3, Alumuium 4" Silver unit 2.00 x 1.00 x 1.00 = 2.00
5 Pas. Pintu type P4, Alumuium 4" Silver unit 4.00 x 1.00 x 1.00 = 4.00
5 Pas. Jendela type J1, Alumuium 4" Silver unit 1.00 x 1.00 x 1.00 = 1.00
6 Pas. Jendela type J2, Alumuium 4" Silver unit 11.00 x 1.00 x 1.00 = 11.00
Pas. Jendela type J3, Alumuium 4" Silver unit 1.00 x 1.00 x 1.00 = 1.00
7 Pas. Bouvenlight BV1, Alumunium 4" Silver unit 3.00 x 1.00 x 1.00 = 3.00
8 Pas. Bouvenlight BV2, Alumunium 4" Silver unit 3.00 x 1.00 x 1.00 = 3.00
9 Pas. Bouvenlight BV3, Alumunium 4" Silver unit - x 1.00 x 1.00 = -
Sub Jumlah x x = -
V PEKERJAAN PENUTUP ATAP x x = -
1 Pas. Rangka Atap Baja Ringan m2 x x = -

2 Pas. Atap Genteng Morando m2 x x = -

3 Pas. Bubungan Genteng Morando m' x x = -

4 Pas. Talang Miring m' x x = -

5 Pas. Listplank GRC t = 9 mm m' x x = -


Sub Jumlah x x = -
VI PEKERJAAN PENGECATAN x x = -
1 Pek. Pengecatan Dinding 3x m2 x x = -

2 Pek. Pengecatan Plafond 3x m2 x x = -

3 Pek. Pengecatan Listplank GRC m2 x x = -


Sub Jumlah
VII PEKERJAAN SANITARY
1 Pas. Closet Duduk bh x x = -

2 Pas. Floor Drain Stainles bh x x = -

3 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh x x = -

4 Pas. Kran Air dia. 1/2" bh x x = -

5 Pas. Kran Hendle Panjang dia. 1/2" bh x x = -

6 Pas. Jet Washer bh x x = -

7 Pas. Tempat Sabun Keramik bh x x = -

8 Pas. Gantungan Handuk bahan Stainless bh x x = -

9 Pas. Wastafel lengkap bh x x = -

10 Pas. Bak Cuci piring 1 lobang Stainless steel unit x x = -

11 Pas. Spoel Hook , sek TOTO unit 1.00 x x = -

12 Pas. Sumur bor + Pompa unit x x = -

13 Pek. Menara Air besi siku lengkap aksesoris unit x x = -

13 Pek. Rumah Pompa lengkap aksesoris unit x x = -

14 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris unit x x = -
SAT
NO. URAIAN PEKERJAAN

a b c
14 Pek. Septiktank uk. 2 x 1.5 x 1.5 m unit x x = -
- bangunan septiktank
- valve, fitting & aksesoris
- pemipaan septiktank & bidang resapan
- galian & urugan
- bak kontrol
- testing & commisionning

15 Pek. IPAL ( Bio septik pabrikasi ) uk. 1 x 3 m (3 segmen) unit x x = -


Kap. 3 m³, termasuk
- bangunan septiktank
- velve, fitting & aksesoris
- pemipaan septiktank & bidang resapan
- galian & urugan
- bak kontrol
- testing & commisionning
Sub Jumlah
VIII PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -

2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk x x = -

3 Pek. Instlasali daya AC NYM 3x2,5 mm (bahan+upah) ttk x x = -

3 Pas. Lampu RMI 2 x 20 watt + aksesoris Philips bh x x = -

4 Pas. Lampu Baret Kotak 20 watt aksesoris Philips bh x x = -

5 Pas. Lampu Down Light bh x x = -

6 Pas. Lampu SL bh x x = -

7 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh x x = -

8 Pas. Saklar Ganda , sek. Broco bh x x = -

9 Pas. Saklar Tunggal, sek. Broco bh x x = -

10 Pas. Box MCB + MCB 6 Group bh x x = -

11 Biaya penyambungan listrik (BP) ke PLN 6.5 KVA ls x x = -


Sub Jumlah
IX PEKERJAAN PLUMBING
a. Pekerjaan Pipa Air Bersih
1 Pas. Pipa PVC AW dia. 1" sek. Maspion m' x x = -

2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' x x = -

3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' x x = -

b. Pekerjaan Pipa Air bekas , Air kotor & vent


1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' x x = -

2 Pas. Pipa PVC AW dia. 3" sek. Maspion + Pipa tegak m' x x = -

3 Pas. Pipa PVC AW dia. 2" sek. Maspion m' x x = -


Sub Jumlah
C PEKERJAAN LANTAI II
I PEKERJAAN TEMBOKAN
1 Pek. Kolom Praktis 12/12 m3 21.00 x 0.01 x 3.50 = 0.81

2 Pas. Kolom 20/20 m3 x x = -

3 Pas. Kolom 30/30 m3 20.00 x 0.09 x 3.50 = 6.30

Pas. Balok Beton 25/45 m3 x x = -


SAT
NO. URAIAN PEKERJAAN

a b c

4 Pek. Plat Lantai Beton m3 2.00 x 3.00 x 0.12 = 0.72

5 Pek. Balok/Ringbalk beton bertulang 15/20 m3 150.00 x 0.15 x 0.20 = 4.50

6 Pek. Meja Beton m3 2.00 x 0.60 x 0.07 = 0.08

7 Pek. Balok Lintel 12/15 m3 35.50 x 0.12 x 0.15 = 0.64

8 Pek. Dinding Bata 1 : 5 m2 150.00 x 3.30 x 1.00 = 495.00


60.66
434.34

PG 1 2.60 x 2.30 x - = -
P1 2.60 x 1.50 x 2.00 = 7.80
P2 2.60 x 0.90 x 7.00 = 16.38
P3 2.60 x 0.80 x 3.00 = 6.24
P4 2.10 x 0.80 x - = -
J1 2.40 x 0.70 x 1.00 = 1.68
J2 1.55 x 1.35 x 12.00 = 25.11
J3 1.55 x 2.00 x = -
BV 1 0.50 x 0.70 x = -
BV 2 0.50 x 1.15 x 6.00 = 3.45
BV 3 0.50 x 2.00 x = -
60.66

9 Pek. Plesteran + Acian 1 : 5 m 434.34 x 2.00 x 1.00 = 868.68

10 Pas. Lantai Keramik uk 20 x 20 cm DN m2 2.00 x 3.00 x 1.00 = 6.00


1.50 2.00 1.00 3.00
9.00

11 Pas. Lantai Keramik uk 40 x 40 cm DN m2 21.00 x 11.00 x 1.00 = 231.00


12.00
210.00

12 Pas. Dinding Keramik uk 20 x 25 cm DN m2 6.20 x 1.50 x 1.00 = 9.30


6.20 x 1.50 x 1.00 = 9.30
6.20 x 1.50 x 1.00 = 9.30
27.90

Sub Jumlah
II PEKERJAAN PLAFOND
Pas. Dinding Partisi Gypsum m2 45.00 x 3.20 x 1.00 = 144.00
P1 2.60 1.50 2.00 7.80
P2 2.60 0.90 5.00 11.70
124.50

1 Pek. Plafond Gypsum 9 mm, + R.Hollow m2 21.00 x 11.00 x 1.00 = 231.00

2 Pek. Plafond GRC 4 mm + rangka Hollow m2 72.00 x 1.00 x 1.00 = 72.00

3 Pek. List Plafond Gypsum m' 205.00 x 1.00 x 1.00 = 205.00


Sub Jumlah
III PEKERJAAN ALUMUNIUM
1 Pas. Pintu type P1, Alumuium 4" Silver unit x x = -
2 Pas. Pintu type P2, Alumuium 4" Silver unit x x = -
3 Pas. Pintu type P3, Alumuium 4" Silver unit x x = -
4 Pas. Jendela type J1, Alumuium 4" Silver unit x x = -
5 Pas. Jendela type J2, Alumuium 4" Silver unit x x = -
6 Pas. Jendela type J4, Alumuium 4" Silver unit x x = -
7 Pas. Bouvenlight BV1, Alumunium 4" Silver unit x x = -
8 Pas. Bouvenlight BV2, Alumunium 4" Silver unit x x = -
Sub Jumlah
IV PEKERJAAN PENUTUP ATAP
1 Pas. Rangka Atap Baja Ringan m2 10.50 x 7.65 x 2.00 = 160.65
SAT
NO. URAIAN PEKERJAAN

a b c
6.50 x 7.65 x 2.00 = 99.45
6.50 x 7.65 x 2.00 = 99.45
359.55

2 Pas. Atap Genteng Morando m2 x x = -

3 Pas. Bubungan Genteng Morando m' x x = -

4 Pas. Talang Miring m' x x = -

5 Pas. Listplank GRC t = 9 mm m' x x = -


Sub Jumlah
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 x x = -

2 Pek. Pengecatan Plafond 3x m2 x x = -

3 Pek. Pengecatan Listplank GRC m2 x x = -


Sub Jumlah
VI PEKERJAAN SANITARY
1 Pas. Closet Duduk unit x x = -

2 Pas. Closet Jongkok bh x x = -

3 Pas. Floor Drain Stainles bh x x = -

4 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh x x = -

5 Pas. Kran Air dia. 1/2" bh x x = -

6 Pas. Kran Hendle Panjang dia. 1/2" bh x x = -

7 Pas. Jet Washer bh x x = -

8 Pas. Tempat Sabun Keramik bh x x = -

9 Pas. Gantungan Handuk bahan Stainless bh x x = -

10 Pas. Wastafel lengkap bh x x = -

11 Pas. Bak Cuci piring 1 lobang Stainless steel bh x x = -

12 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris bh x x = -
Sub Jumlah
VII PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -

2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk x x = -

3 Pas. Lampu TKI 2 x 20 watt + aksesoris Philips bh x x = -

4 Pas. Lampu Down Light bh x x = -

3 Pas. Lampu SL bh x x = -

4 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh x x = -

5 Pas. Saklar Ganda , sek. Broco bh x x = -

6 Pas. Saklar Tunggal, sek. Broco bh x x = -

7 Pas. Box MCB + MCB 6 Group bh x x = -


Sub Jumlah
VIII PEKERJAAN PLUMBING
a. Pekerjaan Pipa Air Bersih
1 Pas. Pipa PVC AW dia. 1" sek. Maspion m' x x = -
SAT
NO. URAIAN PEKERJAAN

a b c

2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' x x = -

3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' x x = -

b. Pekerjaan Pipa Air bekas , Air kotor & vent


1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' x x = -

2 Pas. Pipa PVC AW dia. 3" sek. Maspion + Pipa tegak m' x x = -
Sub Jumlah
D PEKERJAAN LAIN LAIN
1 Pek. Plank Nama bahan Stainless uk. 75 cm x 25 cm bh x x = -
" PUSKESMAS CIKONDANG "
Kecamatan Haurwangi - Kabupaten Cianjur
3 Pas. Saluaran Air Hujan Pasangan Gravel 1/2 Dia. 20 cm m' x x = -

2 Pek. Tangga Pipa Besi bh x x = -

3 Pas. Railing Stainless Steel dia. 2 " lengkap aksesoris m' x x = -


Sub Jumlah
HITUNGAN VOLUME PEKERJAAN
KEGIATAN : PEMBANGUNAN GEDUNG DAN REVITALISASI PUSKESMAS MAMPU PONED
PEKERJAAN : PEMBANGUNAN PUSKESMAS CIBEBER
SATKER : DINAS KESEHATAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016

SAT
NO. URAIAN PEKERJAAN

a b c
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' x 1.00 x 1.00 = -
2 Pembuatan Papan Nama proyek ls x 1.00 x 1.00 = -
3 Sewa Direksikeet ls x 1.00 x 1.00 = -
4 Administrasi, Perijinan dan Dokumentasi ls x 1.00 x 1.00 = -
5 Bongkaran ls x 1.00 x 1.00 = -

Sub Jumlah x x = -
B PEKERJAAN LANTAI I x x = -
I PEKERJAAN TANAH x x = -
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x 1.00 x 1.00 = -

Pek. Galian Tanah untuk pondasi footplat maks. 2 m m3 2.25 2.50 -


1.00 1.50 -
-

2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x 0.35 x 1.00 = -

3 Pek. Urugan Tanah dibawah lantai dipadatkan m3 x 1.00 x 0.20 = -

4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x 1.00 x 0.05 = -


Sub Jumlah x x = -
II PEKERJAAN TEMBOKAN x x = -
1 Pas. Aanstamping m3 x 0.15 x 1.00 = -

2 Pek. Pondasi Batu Kali ad 1:5 m3 x 0.55 x 0.80 = -

3 Pek. Pondasi Foot Plat m3 x 2.25 x 0.25 = -


0.12 2.25 -
1.00 0.25 -
0.05 1.25 -
-

1 Pek. Sloof Beton 15/20 m3 x 0.20 x 0.15 = -

4 Pek. Sloof Beton 20/30 m3 x 0.20 x 0.30 = -

5 Pek. Kolom Praktis 12/12 m3 x 0.01 x 3.70 = -

5 Pas. Kolom 25/25 m3 x 0.06 x 3.70 = -

6 Pas. Kolom 30/30 m3 x 0.09 x 3.70 = -

7 Pas. Balok Beton 20/40 m3 x 0.20 x 0.28 = -

8 Pas. Balok Beton 15/30 m3 x 0.15 x 0.18 = -


x 0.15 x 0.18 = -
x 0.15 x 0.18 = -
x 0.15 x 0.18 = -
-

1 Pas. Balok Anak 15/25 m3 x 0.15 x 0.13 = -


x 0.15 x 0.13 = -
-
SAT
NO. URAIAN PEKERJAAN

a b c
9 Pek. Plat Lantai Beton T = 12 m3 x 0.12 x 1.00 = -
VOID x 0.12 x 1.00 = -
x 0.12 x 1.00 = -
-

PEK. DAK BETON t = 10 cm x 0.10 x 1.00 = -


x 0.10 x 1.00 = -

Pek. Listplank beton m3 x 0.05 x 0.40 = -

10 Pek. Plat Tangga Beton m3 x 0.13 x 1.00 = -


x 0.13 x 1.00 = -
-

11 Pek. Balok Bordes 15/20 m3 x 0.15 x 0.25 = -

12 Pek. Meja Beton m3 x 0.60 x 0.10 = -

13 Pek. Balok Lintel 12/15 m3 x 0.12 x 0.15 = -

14 Pek. Dinding Bata 1 : 5 m2 x 3.70 x 1.00 = -


-
PG 1 x 2.50 x 2.00 = -
P1 x 1.50 x 1.00 = -
P2 x 0.90 x 12.00 =
P3 x 0.80 x 2.00 =
P4 x 0.80 x 4.00 =
J1 x 0.70 x 1.00 =
J2 x 1.35 x 11.00 =
J4 x 0.70 x 1.00 =
BV 1 x 0.70 x 3.00 =
BV 2 x 1.15 x 3.00 =
BV 3 x 2.00 x 24.00 = -
-

15 Pek. Plesteran + Acian 1 : 5 m2 x 2.00 x 1.00 = -


-
-

16 Pek. Lantai Rabat Beton ad 1:3:5 + acian m3 x 0.12 x 1.00 = -

17 Pas. Lantai Keramik uk 20 x 20 cm DN m2 x 3.00 x 1.00 = -


3.00 1.00
2.00 1.00
-

18 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x 12.00 x 1.00 = -

tangga 1.50 1.00 -


entrance 6.00 1.00 -
-
-
-

19 Pas. Dinding Keramik uk 20 x 25 cm DN m2


WC/KM 1.50 1.00 -
1.50 - -
SAT
NO. URAIAN PEKERJAAN

a b c

20 Pas. Floor Hardner m' x 12.00 x 1.00 = -

21 Pas. Batu Tempel m2 x 4.00 x 3.00 = -

Sub Jumlah x x = -
III PEKERJAAN PLAFOND x x = -
1 Pas. Dinding Partisi Gypsum m2 x x = -

1 Pek. Plafond Gypsum 9 mm, + R.Hollow m2 x 11.00 x 1.00 = -


4.00 1.00 -
9.00 1.00 -
-
VOID 4.00 1.00 -
GRC -
-

2 Pek. Plafond GRC 4 mm + rangka Hollow m2 x 2.00 x 3.00 = -


x 3.00 x 2.00 = -
x 0.50 x 1.00 = -
-

3 Pek. List Plafond Gypsum m1 x 1.00 x 1.00 = -

3 Pek. List Plafond Kayu m1 x 1.00 x 1.00 = -

5 Pas. Kayu Bagian Bawah (Kusen) , kayu klas II m3 x x = -


Sub Jumlah x x = -
IV PEKERJAAN ALUMUNIUM x x = -
1 Pas. Pintu type PG1, Alumuium 4" Silver unit x 1.00 x 1.00 = -
2 Pas. Pintu type P1, Alumuium 4" Silver unit x 1.00 x 1.00 = -
3 Pas. Pintu type P2, Alumuium 4" Silver unit x 1.00 x 1.00 = -
4 Pas. Pintu type P3, Alumuium 4" Silver unit x 1.00 x 1.00 = -
5 Pas. Pintu type P4, Alumuium 4" Silver unit x 1.00 x 1.00 = -
5 Pas. Jendela type J1, Alumuium 4" Silver unit x 1.00 x 1.00 = -
6 Pas. Jendela type J2, Alumuium 4" Silver unit x 1.00 x 1.00 = -
Pas. Jendela type J3, Alumuium 4" Silver unit x 1.00 x 1.00 = -
7 Pas. Bouvenlight BV1, Alumunium 4" Silver unit x 1.00 x 1.00 = -
8 Pas. Bouvenlight BV2, Alumunium 4" Silver unit x 1.00 x 1.00 = -
9 Pas. Bouvenlight BV3, Alumunium 4" Silver unit x 1.00 x 1.00 = -
Sub Jumlah x x = -
V PEKERJAAN BAJA x x = -
Pas. Kolom IWF. 350.175.7.11 kg x 24.00 x - = -
Pas. Balok IWF. 350.175.7.11 kg x 3.00 x - = -
kg x 8.00 x - = -
-
Pas. Balok IWF. 200.100.5,5.8 kg x 2.00 x - = -
7.00 - -
-

Pek. Plat Stepner kg x 5.00 x 1.00 = -


Baja Voute kg x 0.50 x - = -
-

Pek. Erikson Baja kg x 1.00 x 1.00 = -


Pas. Base Plat bh x 1.00 x 1.00 = -

Pas. Baut HTB Dia. 16" bh x 8.00 x 2.00 = -


SAT
NO. URAIAN PEKERJAAN

a b c
x 8.00 x 6.00 = -
x 8.00 x 2.00 = -
x 8.00 x 6.00 = -
x 8.00 x 6.00 = -
-

Sub Jumlah x x = -
VI PEKERJAAN PENGECATAN x x = -
1 Pek. Pengecatan Dinding 3x m2 - x 1.00 x 1.00 = -

2 Pek. Pengecatan Plafond 3x m2 - x 1.00 x 1.00 = -

3 Pek. Pengecatan Listplank GRC m2 x x = -


Sub Jumlah
VII PEKERJAAN SANITARY
1 Pas. Closet Duduk bh x 1.00 x 1.00 = -

Pas. Closet Jongkok bh x 1.00 x 1.00 = -

2 Pas. Floor Drain Stainles bh x 1.00 x 1.00 = -

3 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh x 1.00 x 1.00 = -

4 Pas. Kran Air dia. 1/2" bh x 1.00 x 1.00 = -

5 Pas. Kran Hendle Panjang dia. 1/2" bh x x = -

6 Pas. Jet Washer bh x 1.00 x 1.00 = -

7 Pas. Tempat Sabun Keramik bh x 1.00 x 1.00 = -

8 Pas. Gantungan Handuk bahan Stainless bh x 1.00 x 1.00 = -

9 Pas. Wastafel lengkap bh x 1.00 x 1.00 = -

10 Pas. Bak Cuci piring 1 lobang Stainless steel unit x x = -

11 Pas. Spoel Hook , sek TOTO unit x 1.00 x 1.00 = -

12 Pas. Sumur bor + Pompa unit x 1.00 x 1.00 = -

13 Pek. Menara Air besi siku lengkap aksesoris unit x x = -

13 Pek. Rumah Pompa lengkap aksesoris unit x 1.00 x 1.00 = -

14 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris unit x 1.00 x 1.00 = -

14 Pek. Septiktank uk. 2 x 1.5 x 1.5 m unit x 1.00 x 1.00 = -


- bangunan septiktank
- valve, fitting & aksesoris
- pemipaan septiktank & bidang resapan
- galian & urugan
- bak kontrol
- testing & commisionning

15 Pek. IPAL ( Bio septik pabrikasi ) uk. 1 x 3 m (3 segmen) unit x x = -


Kap. 3 m³, termasuk
- bangunan septiktank
- velve, fitting & aksesoris
- pemipaan septiktank & bidang resapan
- galian & urugan
- bak kontrol
- testing & commisionning
Sub Jumlah
VIII PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x 1.00 x 1.00 = -
SAT
NO. URAIAN PEKERJAAN

a b c

2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk x 1.00 x 1.00 = -

3 Pek. Instlasali daya AC NYM 3x2,5 mm (bahan+upah) ttk x x = -

3 Pas. Lampu RMI 2 x 20 watt + aksesoris Philips bh x 1.00 x 1.00 = -

Pas. Lampu TL 20 watt + aksesoris Philips bh x 1.00 x 1.00 = -

4 Pas. Lampu Baret Kotak 20 watt aksesoris Philips bh x 1.00 x 1.00 = -

5 Pas. Lampu Down Light bh x 1.00 x 1.00 = -

6 Pas. Lampu SL bh x 1.00 x 1.00 = -

7 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh x 1.00 x 1.00 = -

8 Pas. Saklar Ganda , sek. Broco bh x 1.00 x 1.00 = -

9 Pas. Saklar Tunggal, sek. Broco bh x 1.00 x 1.00 = -

10 Pas. Box MCB + MCB 6 Group bh x 1.00 x 1.00 = -

11 Biaya penyambungan listrik (BP) ke PLN 6.5 KVA ls x 1.00 x 1.00 = -


Sub Jumlah
IX PEKERJAAN PLUMBING
a. Pekerjaan Pipa Air Bersih
1 Pas. Pipa PVC AW dia. 1" sek. Maspion m' x 1.00 x 1.00 = -

2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' x 1.00 x 1.00 = -

3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' x 1.00 x 1.00 = -

b. Pekerjaan Pipa Air bekas , Air kotor & vent


1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' x 1.00 x 1.00 = -

2 Pas. Pipa PVC AW dia. 3" sek. Maspion + Pipa tegak m' x 1.00 x 1.00 = -

3 Pas. Pipa PVC AW dia. 2" sek. Maspion m' x 1.00 x 1.00 = -
Sub Jumlah
C PEKERJAAN LANTAI II
I PEKERJAAN TEMBOKAN
1 Pek. Kolom Praktis 12/12 m3 x 0.01 x 3.50 = -

2 Pas. Kolom 15/20 m3 x 0.03 x 3.50 = -

3 Pas. Kolom 30/30 m3 x 0.09 x 3.50 = -

Pas. Balok Beton 25/45 m3 x x = -

4 Pek. Plat Lantai Beton m3 x 3.00 x 0.12 = -

5 Pek. Balok/Ringbalk beton bertulang 15/20 m3 x 0.15 x 0.20 = -

6 Pek. Meja Beton m3 x 0.60 x 0.07 = -

7 Pek. Balok Lintel 12/15 m3 x 0.12 x 0.15 = -

8 Pek. Dinding Bata 1 : 5 m2 x 3.50 x 1.00 = -


-
-

PG 1 x 2.30 x - = -
P1 x 1.50 x - = -
P2 x 0.90 x 9.00 = -
P3 x 0.80 x = -
SAT
NO. URAIAN PEKERJAAN

a b c
P4 x 0.80 x - = -
J1 x 0.70 x = -
J2 x 1.35 x 4.00 = -
J3 x 2.00 x = -
BV 1 x 0.70 x = -
BV 2 x 1.15 x = -
BV 3 x 2.00 x 32.00 = -
-

9 Pek. Plesteran + Acian 1 : 5 m x 2.00 x 1.00 = -


-
-

10 Pas. Lantai Keramik uk 20 x 20 cm DN m2 x 1.50 x 1.00 = -


2.00 1.00 -
-

11 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x 12.00 x 1.00 = -


-
(15.00)

12 Pas. Dinding Keramik uk 20 x 25 cm DN m2 x 1.50 x 3.00 = -


x 1.50 x 1.00 =
-

Sub Jumlah
II PEKERJAAN PLAFOND
Pas. Dinding Partisi Gypsum m2 x 3.50 x 1.00 = -
P1 1.50 3.00 -
P2 0.90 3.00 -

1 Pek. Plafond Gypsum 9 mm, + R.Hollow m2 x 12.00 x 1.00 = -

2 Pek. Plafond GRC 4 mm + rangka Hollow m2 x 1.00 x 1.00 = -

3 Pek. List Plafond Gypsum m' x 1.00 x 1.00 = -


Sub Jumlah
III PEKERJAAN ALUMUNIUM
1 Pas. Pintu type P1, Alumuium 4" Silver unit x x = -
2 Pas. Pintu type P2, Alumuium 4" Silver unit x x = -
3 Pas. Pintu type P3, Alumuium 4" Silver unit x x = -
4 Pas. Jendela type J1, Alumuium 4" Silver unit x x = -
5 Pas. Jendela type J2, Alumuium 4" Silver unit x x = -
6 Pas. Jendela type J4, Alumuium 4" Silver unit x x = -
7 Pas. Bouvenlight BV1, Alumunium 4" Silver unit x x = -
8 Pas. Bouvenlight BV2, Alumunium 4" Silver unit x x = -
Sub Jumlah
IV PEKERJAAN PENUTUP ATAP
1 Pas. Rangka Atap Baja Ringan m2 x 44.00 x 1.00 = -
x 44.00 x = -
-

2 Pas. Atap Genteng Morando m2 x 1.00 x 1.00 = -

3 Pas. Bubungan Genteng Morando m' x 1.00 x 1.00 =

4 Pas. Talang Miring m' x x = -

5 Pas. Listplank GRC t = 9 mm m' x 1.00 x 1.00 = -


Sub Jumlah
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 x 1.00 x 1.00 = -

2 Pek. Pengecatan Plafond 3x m2 x 1.00 x 1.00 = -


SAT
NO. URAIAN PEKERJAAN

a b c
3 Pek. Pengecatan Listplank GRC m2 x 1.00 x 1.00 = -
Sub Jumlah
VI PEKERJAAN SANITARY
1 Pas. Closet Duduk unit x 1.00 x 1.00 = -

2 Pas. Closet Jongkok bh x x = -

3 Pas. Floor Drain Stainles bh x x = -

4 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh x x = -

5 Pas. Kran Air dia. 1/2" bh x x = -

6 Pas. Kran Hendle Panjang dia. 1/2" bh x x = -

7 Pas. Jet Washer bh x x = -

8 Pas. Tempat Sabun Keramik bh x x = -

9 Pas. Gantungan Handuk bahan Stainless bh x x = -

10 Pas. Wastafel lengkap bh x x = -

11 Pas. Bak Cuci piring 1 lobang Stainless steel bh x x = -

12 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris bh x x = -
Sub Jumlah
VII PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -

2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk x x = -

3 Pas. Lampu TKI 2 x 20 watt + aksesoris Philips bh x x = -

4 Pas. Lampu Down Light bh x x = -

3 Pas. Lampu SL bh x x = -

4 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh x x = -

5 Pas. Saklar Ganda , sek. Broco bh x x = -

6 Pas. Saklar Tunggal, sek. Broco bh x x = -

7 Pas. Box MCB + MCB 6 Group bh x x = -


Sub Jumlah
VIII PEKERJAAN PLUMBING
a. Pekerjaan Pipa Air Bersih
1 Pas. Pipa PVC AW dia. 1" sek. Maspion m' x x = -

2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' x x = -

3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' x x = -

b. Pekerjaan Pipa Air bekas , Air kotor & vent


1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' x x = -

2 Pas. Pipa PVC AW dia. 3" sek. Maspion + Pipa tegak m' x x = -
Sub Jumlah
D PEKERJAAN LAIN LAIN
1 Pek. Plank Nama bahan Stainless uk. 75 cm x 25 cm bh x x = -
" PUSKESMAS CIKONDANG "
Kecamatan Haurwangi - Kabupaten Cianjur
3 Pas. Saluaran Air Hujan Pasangan Gravel 1/2 Dia. 20 cm m' x x = -
SAT
NO. URAIAN PEKERJAAN

a b c
2 Pek. Tangga Pipa Besi bh x x = -

3 Pas. Railing Stainless Steel dia. 2 " lengkap aksesoris m' x x = -


Sub Jumlah