1 2 3 4
HARGA
NO JENIS BAHAN-BAHAN SATUAN SATUAN
( Rp. )
a b c d
AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
1 Tanah Urug m3 90,000.00
2 Pasir urug m3 105,000.00
3 Pasir pasang kali m3 165,000.00
4 Pasir beton m3 180,000.00
5 Abu Batu m3 185,000.00
6 Batu pecah mesin 1/2 m3 185,000.00
7 Batu pecah mesin 2/3 m3 180,000.00
8 Batu pecah mesin 3/5 m3 175,000.00
9 Batu pecah mesin 5/7 m3 170,000.00
10 Batu belah pondasi m3 165,000.00
11 Sirtu m3 145,000.00
12 Bata merah Kelas I bh 900.00
13 Sement PC ( 50 Kg) zak 73,000.00
14 Sement PC kg 1,460.00
15 Sement Warna kg 11,500.00
16 Semant Putih 40 kg zak 95,000.00
1 2 3 4 5 6=(3x5)
A.01 1 M2 PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M ANALISA PU
UPAH :
Pekerja 0.2000 OH 65,000.00 13,000.00
Tukang Kayu 0.4000 OH 80,000.00 32,000.00
Kepala Tukang 0.0200 OH 90,000.00 1,800.00
Mandor 0.0200 OH 100,000.00 2,000.00
Sub Jumlah 48,800.00
BAHAN :
Dolken kayu diameter
1.2500 Btg 17,500.00 21,875.00
8-10/400 cm
Semen Portland 2.5000 Kg 1,460.00 3,650.00
Seng gelombang 1.2000 Lbr #NAME? #NAME?
Pasir beton 0.0050 m3 #NAME? #NAME?
Koral beton 0.0090 m3 180,000.00 1,620.00
Kayu 5/7 0.0720 m3 #NAME? #NAME?
Paku Biasa 2" - 5" 0.0600 kg #NAME? #NAME?
Meni Besi 0.4500 Ltr #NAME? #NAME?
Sub Jumlah #NAME?
PERALATAN :
Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.02 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK ANALISA PU
UPAH :
Pekerja 0.1000 OH 65,000.00 6,500.00
Tukang Kayu 0.1000 OH 80,000.00 8,000.00
Kepala Tukang 0.0100 OH 90,000.00 900.00
Mandor 0.0050 OH 100,000.00 500.00
Sub Jumlah 15,900.00
BAHAN :
Kayu 5/7 0.0120 m3 #NAME? #NAME?
Paku Biasa 2"-3" 0.0200 Kg #NAME? #NAME?
Kayu Papan 3/20 0.0070 m3 #NAME? #NAME?
Sub Jumlah #NAME?
PERALATAN :
Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.03 1 M2 PEMBUATAN GUDANG SEMEN DAN PERALATAN ANALISA PU
UPAH :
Pekerja 1.0000 OH 65,000.00 65,000.00
Tukang Kayu 2.0000 OH 80,000.00 160,000.00
Kepala Tukang 0.2000 OH 90,000.00 18,000.00
Mandor 0.0500 OH 100,000.00 5,000.00
Sub Jumlah 248,000.00
BAHAN :
Dolken kayu diameter 8 - 10 cm/400 cm 1.7000 17,500.00 29,750.00
Kayu 0.2100 #NAME? #NAME?
1 2 3 4 5 6=(3x5)
Paku biasa 0.3000 #NAME? #NAME?
Semen Portland 10.5000 1,460.00 15,330.00
Pasir beton 0.0300 #NAME? #NAME?
Koral Beton 0.0500 180,000.00 9,000.00
Seng Gelombang 1.5000 #NAME? #NAME?
Seng plat 0.2500 #NAME? #NAME?
Sub Jumlah #NAME?
1 2 3 4 5 6=(3x5)
PERALATAN :
Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.04 1 M2 PEMBERSIHAN LAPANGAN DAN PERATAAN ANALISA PU
UPAH :
Pekerja 0.1000 OH 65,000.00 6,500.00
Mandor 0.0500 OH 100,000.00 5,000.00
Sub Jumlah 11,500.00
BAHAN :
Sub Jumlah -
PERALATAN :
Sub Jumlah -
Jumlah 11,500.00
Keuntungan Max. 10 % 1,150.00
Jumlah Total 12,650.00
Dibulatkan 12,650.00
A.05 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M ANALISA PU
UPAH :
Pekerja 0.7500 OH 65,000.00 48,750.00
Mandor 0.0250 OH 100,000.00 2,500.00
Sub Jumlah 51,250.00
BAHAN :
Sub Jumlah
PERALATAN :
Sub Jumlah -
Jumlah 51,250.00
Keuntungan Max. 10 % 5,125.00
Jumlah Total 56,375.00
Dibulatkan 56,375.00
A.06 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M ANALISA PU
UPAH :
Pekerja 0.9000 OH 65,000.00 58,500.00
Mandor 0.0450 OH 100,000.00 4,500.00
Sub Jumlah 63,000.00
BAHAN :
Sub Jumlah
PERALATAN :
Sub Jumlah -
Jumlah 63,000.00
Keuntungan Max. 10 % 6,300.00
Jumlah Total 69,300.00
Dibulatkan 69,300.00
A.07 1 M2 PEKERJAAN STRIPING TANAH ANALISA PU
UPAH :
Pekerja 0.0500 OH 65,000.00 3,250.00
1 2 3 4 5 6=(3x5)
Mandor 0.0050 OH 100,000.00 500.00
Sub Jumlah 3,750.00
BAHAN :
Sub Jumlah
1 2 3 4 5 6=(3x5)
PERALATAN :
Sub Jumlah -
Jumlah 3,750.00
Keuntungan Max. 10 % 375.00
Jumlah Total 4,125.00
Dibulatkan 4,125.00
A.08 1 M3 URUGAN TANAH KEMBALI ANALISA PU
UPAH :
Pekerja 0.5000 OH 65,000.00 32,500.00
Mandor 0.0500 OH 100,000.00 5,000.00
Sub Jumlah 37,500.00
BAHAN :
Sub Jumlah
PERALATAN :
Sub Jumlah -
Jumlah 37,500.00
Keuntungan Max. 10 % 3,750.00
Jumlah Total 41,250.00
Dibulatkan 41,250.00
A.09 1 M3 MEMADATKAN TANAH ( PER 20 CM) ANALISA PU
UPAH :
Pekerja 0.5000 OH 65,000.00 32,500.00
Mandor 0.0500 OH 100,000.00 5,000.00
Sub Jumlah 37,500.00
BAHAN :
- -
- -
Sub Jumlah -
PERALATAN :
Sub Jumlah -
Jumlah 37,500.00
Keuntungan Max. 10 % 3,750.00
Jumlah Total 41,250.00
Dibulatkan 41,250.00
A.10 1 M3 URUGAN PASIR URUG ANALISA PU
UPAH :
Pekerja 0.3000 OH 65,000.00 19,500.00
Mandor 0.0100 OH 100,000.00 1,000.00
Sub Jumlah 20,500.00
BAHAN :
Pasir Urug 1.2000 m³ #NAME? #NAME?
Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.11 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps ANALISA PU
UPAH :
Pekerja 1.5000 OH 65,000.00 97,500.00
1 2 3 4 5 6=(3x5)
Tukang 0.7500 OH 80,000.00 60,000.00
Kepala Tukang 0.0750 OH 90,000.00 6,750.00
Mandor 0.0750 OH 100,000.00 7,500.00
Sub Jumlah 171,750.00
1 2 3 4 5 6=(3x5)
BAHAN :
Batu Belah 15/20 1.2000 m³ #NAME? #NAME?
PC 202.0000 kg 1,460.00 294,920.00
Pasir Pasang 0.4850 m³ #NAME? #NAME?
Sub Jumlah #NAME?
PERALATAN :
Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.12 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps ANALISA PU
UPAH :
Pekerja 1.5000 OH 65,000.00 97,500.00
Tukang Batu 0.7500 OH 80,000.00 60,000.00
Kepala Tukang 0.0750 OH 90,000.00 6,750.00
Mandor 0.0750 OH 100,000.00 7,500.00
Sub Jumlah 171,750.00
BAHAN :
Batu Belah 15/20 1.2000 m³ #NAME? #NAME?
PC 136.0000 kg 1,460.00 198,560.00
Pasir Pasang 0.5440 m³ #NAME? #NAME?
Sub Jumlah #NAME?
PERALATAN :
Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.13 1 M3 PASANG AANSTAMPING BATU KOSONG ANALISA PU
UPAH :
Pekerja 0.7800 OH 65,000.00 50,700.00
Kepala Tukang 0.3900 OH 80,000.00 31,200.00
Kepala Tukang 0.0390 OH 90,000.00 3,510.00
Mandor 0.0390 OH 100,000.00 3,900.00
Sub Jumlah 89,310.00
BAHAN :
Batu Belah 15/20 1.2000 m³ #NAME? #NAME?
Pasir Urug 0.4320 m³ #NAME? #NAME?
Sub Jumlah #NAME?
PERALATAN :
Sub Jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.14 1 M3 MEMBUAT ADUKAN LANTAI KERJA f'c = 7.4 Mpa (K 100) ANALISA PU
UPAH :
Pekerja 1.2000 OH 65,000.00 78,000.00
Tukang Batu 0.2000 oh 80,000.00 16,000.00
Kepala Tukang 0.0200 OH 90,000.00 1,800.00
Mandor 0.0600 OH 100,000.00 6,000.00
Sub jumlah 101,800.00
BAHAN :
Semen Portland 230.000 kg 1,460.00 335,800.00
Pasir Beton 893.000 kg #NAME? #NAME?
1 2 3 4 5 6=(3x5)
Kerikil 1,027.000 kg 133.33 136,933.33
Air 200.000 ltr 200.00 40,000.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.15 1 M3 MEMBUAT ADUKAN BETON f'c = 7.4 Mpa (K 100) ANALISA PU
UPAH :
Pekerja 1.6500 OH 65,000.00 107,250.00
Tukang Batu 0.2750 OH 80,000.00 22,000.00
Kepala Tukang 0.0280 OH 90,000.00 2,520.00
Mandor 0.0830 OH 100,000.00 8,300.00
Sub jumlah 140,070.00
BAHAN :
Semen Portland 247.0000 kg 1,460.00 360,620.00
Pasir Beton 869.0000 kg #NAME? #NAME?
Kerikil 999.0000 kg 133.33 133,200.00
Air 215.0000 ltr 200.00 43,000.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.16 1 M3 MEMBUAT ADUKAN BETON f'c = 14.5 Mpa (K 175) ANALISA PU
UPAH :
Pekerja 1.6500 OH 65,000.00 107,250.00
Tukang Batu 0.2750 OH 80,000.00 22,000.00
Kepala Tukang 0.0280 OH 90,000.00 2,520.00
Mandor 0.0830 OH 100,000.00 8,300.00
Sub jumlah 140,070.00
BAHAN :
Semen Portland 326.0000 kg 1,460.00 475,960.00
Pasir Beton 760.0000 kg #NAME? #NAME?
Kerikil 1,029.0000 kg 133.33 137,200.00
Air 215.0000 ltr 200.00 43,000.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.17 1 M3 MEMBUAT ADUKAN BETON f'c = 19.3 Mpa (K 225) ANALISA PU
UPAH :
Pekerja 1.6500 OH 65,000.00 107,250.00
Tukang Batu 0.2750 OH 80,000.00 22,000.00
Kepala Tukang 0.0280 OH 90,000.00 2,520.00
Mandor 0.0830 OH 100,000.00 8,300.00
Sub jumlah 140,070.00
BAHAN :
Semen Portland 371.0000 kg 1,460.00 541,660.00
1 2 3 4 5 6=(3x5)
Pasir Beton 698.0000 kg #NAME? #NAME?
Kerikil 1,047.0000 kg 133.33 139,600.00
Air 215.0000 ltr 200.00 43,000.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
1 2 3 4 5 6=(3x5)
A.18 1 M3 MEMBUAT ADUKAN BETON f'c = 21.7 Mpa (K 250) ANALISA PU
UPAH :
Pekerja 1.6500 OH 65,000.00 107,250.00
Tukang Batu 0.2750 OH 80,000.00 22,000.00
Kepala Tukang 0.0280 OH 90,000.00 2,520.00
Mandor 0.0830 OH 100,000.00 8,300.00
Sub jumlah 140,070.00
BAHAN :
Semen Portland 384.0000 kg 1,460.00 560,640.00
Pasir Beton 692.0000 kg #NAME? #NAME?
Kerikil 1,039.0000 kg 133.33 138,533.33
Air 215.0000 ltr 200.00 43,000.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.19 10 Kg BESI BETON TERPASANG ANALISA PU
UPAH :
Pekerja 0.0700 OH 65,000.00 4,550.00
Tukang 0.0700 OH 80,000.00 5,600.00
Kepala Tukang 0.0070 OH 90,000.00 630.00
Mandor 0.0040 OH 100,000.00 400.00
Sub jumlah 11,180.00
BAHAN :
Besi Beton 10.5000 kg #NAME? #NAME?
Kawat beton 0.1500 kg #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.20 1 M2 BEKISTING UNTUK PONDASI ANALISA PU
UPAH :
Pekerja 0.5200 OH 65,000.00 33,800.00
Tukang 0.2600 OH 80,000.00 20,800.00
Kepala Tukang 0.0260 OH 90,000.00 2,340.00
Mandor 0.0260 OH 100,000.00 2,600.00
Sub jumlah 59,540.00
BAHAN :
Kayu Kelas III x 50% 0.0400 m3 #NAME? #NAME?
Paku 0.3000 kg #NAME? #NAME?
Minyak Bekisting 0.1000 ltr 2,500.00 250.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.21 1 M2 BEKISTING UNTUK SLOOF ANALISA PU
UPAH :
1 2 3 4 5 6=(3x5)
Pekerja 0.5200 OH 65,000.00 33,800.00
Tukang 0.2600 OH 80,000.00 20,800.00
Kepala Tukang 0.0260 OH 90,000.00 2,340.00
Mandor 0.0260 OH 100,000.00 2,600.00
Sub jumlah 59,540.00
1 2 3 4 5 6=(3x5)
BAHAN :
Kayu Kelas III x 50% 0.0450 m3 #NAME? #NAME?
Paku 0.3000 kg #NAME? #NAME?
Minyak Bekisting 0.1000 ltr 2,500.00 250.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.22 1 M2 BEKISTING UNTUK KOLOM ANALISA PU
UPAH :
Pekerja 0.6600 OH 65,000.00 42,900.00
Tukang 0.3300 OH 80,000.00 26,400.00
Kepala Tukang 0.0330 OH 90,000.00 2,970.00
Mandor 0.0330 OH 100,000.00 3,300.00
Sub jumlah 75,570.00
BAHAN :
Kayu Kelas III x 50% 0.0400 m3 #NAME? #NAME?
Paku 0.4000 kg #NAME? #NAME?
Minyak Bekisting 0.2000 ltr 2,500.00 500.00
Balok Kayu Kelas III x 50% 0.0150 m3 #NAME? #NAME?
Plywood Tebal 9 mm x 75% 0.3500 lbr 112,500.00 39,375.00
Dolken Kayu x 50% 2.0000 btg 8,750.00 17,500.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.23 1 M2 BEKISTING UNTUK BALOK ANALISA PU
UPAH :
Pekerja 0.6600 OH 65,000.00 42,900.00
Tukang 0.3300 OH 80,000.00 26,400.00
Kepala Tukang 0.0330 OH 90,000.00 2,970.00
Mandor 0.0330 OH 100,000.00 3,300.00
Sub jumlah 75,570.00
BAHAN :
Kayu Kelas III x 50% 0.0400 m3 #NAME? #NAME?
Paku 0.4000 kg #NAME? #NAME?
Minyak Bekisting 0.2000 ltr 2,500.00 500.00
Balok Kayu Kelas III x 50% 0.0180 m3 #NAME? #NAME?
Plywood Tebal 9 mm x 75% 0.3500 lbr 112,500.00 39,375.00
Dolken Kayu x 50% 2.0000 btg 8,750.00 17,500.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.24 1 M2 BEKISTING UNTUK PLAT LANTAI ANALISA PU
UPAH :
Pekerja 0.6600 OH 65,000.00 42,900.00
1 2 3 4 5 6=(3x5)
Tukang 0.3300 OH 80,000.00 26,400.00
Kepala Tukang 0.0330 OH 90,000.00 2,970.00
Mandor 0.0330 OH 100,000.00 3,300.00
Sub jumlah 75,570.00
1 2 3 4 5 6=(3x5)
BAHAN :
Kayu Kelas III x 50% 0.0400 m3 #NAME? #NAME?
Paku 0.4000 kg #NAME? #NAME?
Minyak Bekisting 0.2000 ltr 2,500.00 500.00
Balok Kayu Kelas III x 50% 0.0150 m3 #NAME? #NAME?
Plywood Tebal 9 mm x 75% 0.3500 lbr 112,500.00 39,375.00
Dolken Kayu x 50% 6.0000 btg 8,750.00 52,500.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.25 1 M3 KOLOM BETON PRAKTIS uk. 11/11 K. 175 ANALISA PU
Besi Beton 238.5950 kg #NAME? #NAME?
Adukan Beton Site Mix K. 175 1.0000 m3 #NAME? #NAME?
Bekisting Papan 9.0909 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.26 1 M3 KOLOM BETON uk. 20/20 K. 225 ANALISA PU
Besi Beton 123.5000 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 20.0000 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.27 1 M3 KOLOM BETON uk. 30/40 K. 225 ANALISA PU
Besi Beton 186.0889 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 11.6667 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.28 1 M3 SLOOF BETON uk. 15/20 K. 175 ANALISA PU
Besi Beton 157.5083 kg #NAME? #NAME?
Adukan Beton Site Mix K. 175 1.0000 m³ #NAME? #NAME?
Bekisting Papan 13.3333 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.29 1 M3 SLOOF BETON uk. 20/30 K. 225 ANALISA PU
Besi Beton 145.4750 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 10.0000 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.30 1 M3 RINGBALK BETON uk. 15/20 K. 175 ANALISA PU
Besi Beton 157.5083 kg #NAME? #NAME?
Adukan Beton Site Mix K. 175 1.0000 m³ #NAME? #NAME?
Bekisting Papan 13.3333 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
1 2 3 4 5 6=(3x5)
Jumlah Total #NAME?
Dibulatkan #NAME?
1 2 3 4 5 6=(3x5)
A.31 1 M3 PLAT BETON t = 7 cm K. 225 ANALISA PU
Besi Beton 68.5714 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 14.2857 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.32 1 M3 PLAT BETON t = 10 cm K. 225 ANALISA PU
Besi Beton 96.0000 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 10.0000 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.33 1 M3 PLAT BETON t = 12 cm K. 225 ANALISA PU
Besi Beton 124.0000 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 8.3333 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.34 1 M3 PONDASI PLAT BETON SETEMPAT K. 225 ANALISA PU
Besi Beton 145.6000 kg #NAME? #NAME?
Adukan Beton Site Mix K. 225 1.0000 m³ #NAME? #NAME?
Bekisting Papan 4.0000 m2 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.35 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps ANALISA PU
UPAH :
Pekerja 0.3000 OH 65,000.00 19,500.00
Tukang Batu 0.1000 OH 80,000.00 8,000.00
Kepala Tukang 0.0100 OH 90,000.00 900.00
Mandor 0.0150 OH 100,000.00 1,500.00
Sub jumlah 29,900.00
BAHAN :
Bata Merah 5 x 11 x 22 cm 70.0000 bh #NAME? #NAME?
Semen Portland 9.6800 kg 1,460.00 14,132.80
Pasir Pasang 0.0450 m³ #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.36 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM + ACIAN ANALISA PU
UPAH :
Pekerja 0.4000 OH 65,000.00 26,000.00
Tukang Batu 0.2000 OH 80,000.00 16,000.00
Kepala Tukang 0.0200 OH 90,000.00 1,800.00
Mandor 0.0220 OH 100,000.00 2,200.00
Sub jumlah 46,000.00
BAHAN :
Semen Portland 6.9120 kg 1,460.00 10,091.52
Pasir Pasang 0.0350 m³ #NAME? #NAME?
1 2 3 4 5 6=(3x5)
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
1 2 3 4 5 6=(3x5)
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.37 1 M2 PASANGAN SIARAN ad. 1 : 2 ANALISA PU
UPAH :
Pekerja 0.3000 OH 65,000.00 19,500.00
Tukang Batu 0.1500 OH 80,000.00 12,000.00
Kepala Tukang 0.0150 OH 90,000.00 1,350.00
Mandor 0.0150 OH 100,000.00 1,500.00
Sub jumlah 34,350.00
BAHAN :
Semen Portland 6.3400 kg 1,460.00 9,256.40
Pasir Pasang 0.0120 m' #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.38 1 M2 PASANGAN ACIAN ANALISA PU
UPAH :
Pekerja 0.2000 OH 65,000.00 13,000.00
Tukang Batu 0.1000 OH 80,000.00 8,000.00
Kepala Tukang 0.0100 OH 90,000.00 900.00
Mandor 0.0100 OH 100,000.00 1,000.00
Sub jumlah 22,900.00
BAHAN :
Semen Portland 3.2500 kg 1,460.00 4,745.00
Sub jumlah 4,745.00
PERALATAN :
Sub jumlah -
Jumlah 27,645.00
Keuntungan Max. 10 % 2,764.50
Jumlah Total 30,409.50
Dibulatkan 30,410.00
A.39 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM ANALISA PU
UPAH :
Pekerja 0.7000 OH 65,000.00 45,500.00
Tukang Batu 0.3500 OH 80,000.00 28,000.00
Kepala Tukang 0.0350 OH 90,000.00 3,150.00
Mandor 0.0350 OH 100,000.00 3,500.00
Sub jumlah 80,150.00
BAHAN :
Keramik 20 x 20 cm 26.5000 bh #NAME? #NAME?
Semen Portland 10.4000 kg 1,460.00 15,184.00
Pasir Pasang 0.0450 m3 #NAME? #NAME?
Semen Warna 1.6200 kg 11,500.00 18,630.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
1 2 3 4 5 6=(3x5)
A.40 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ANALISA PU
UPAH :
Pekerja 0.7000 OH 65,000.00 45,500.00
Tukang Batu 0.3500 OH 80,000.00 28,000.00
Kepala Tukang 0.0350 OH 90,000.00 3,150.00
Mandor 0.0350 OH 100,000.00 3,500.00
Sub jumlah 80,150.00
BAHAN :
Keramik 30 x 30 cm 11.8700 bh #NAME? #NAME?
Semen Portland 10.0000 kg 1,460.00 14,600.00
Pasir Pasang 0.0450 m3 #NAME? #NAME?
Semen Warna 1.5000 kg 11,500.00 17,250.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.41 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
UPAH :
Pekerja 0.7000 OH 65,000.00 45,500.00
Tukang Batu 0.3500 OH 80,000.00 28,000.00
Kepala Tukang 0.0350 OH 90,000.00 3,150.00
Mandor 0.0350 OH 100,000.00 3,500.00
Sub jumlah 80,150.00
BAHAN :
Keramik 40 x 40 cm 1.0000 m2 #NAME? #NAME?
Semen Portland 10.0000 kg 1,460.00 14,600.00
Pasir Pasang 0.0450 m3 #NAME? #NAME?
Semen Warna 1.5000 kg 11,000.00 16,500.00
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.42 1 M2 PASANG DINDING KERAMIK 20 X 25 CM, S
UPAH : N
I
Pekerja 0.7000 OH 65,000.00 45,500.00 .
Tukang Batu 0.3500 OH 80,000.00 28,000.00 D
T
Kepala Tukang 0.0350 OH 90,000.00 3,150.00
Mandor 0.0350 OH 100,000.00 3,500.00 9
Sub jumlah 80,150.00 1
-
BAHAN : 0
Keramik 20 x 25 cm 20.0000 bh 3,500.00 70,000.00 0
1
Semen Portland 10.4000 kg 1,460.00 15,184.00
2
Pasir Pasang 0.0450 m3 #NAME? #NAME? -
Semen Warna 1.6200 kg 11,500.00 18,630.00 2
0
Sub jumlah #NAME? 0
PERALATAN : 7
.
6
.
Sub jumlah - 3
6
Jumlah #NAME?
.
Keuntungan Max. 10 % #NAME? 1
Jumlah Total #NAME?
1 2 3 4 5 6=(3x5)
Dibulatkan #NAME?
A.43 1 M2 PASANGAN PAVING BLOCK WARNA T = 6 CM SNI.DT 91-0012-2007.
UPAH :
Pekerja 0.3000 OH 65,000.00 19,500.00
Tukang Batu 0.2000 OH 80,000.00 16,000.00
Kepala Tukang Batu 0.0100 OH 90,000.00 900.00
Mandor 0.0100 OH 100,000.00 1,000.00
Sub jumlah 37,400.00
BAHAN :
Paving Block Warna 6 cm 1.0000 m2 #NAME? #NAME?
Pasir Urug 0.0550 m³ #NAME? #NAME?
Sub jumlah #NAME?
1 2 3 4 5 6=(3x5)
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.44 1 M2 PASANG DINDING BATU TEMPEL ANALISA PU
UPAH :
Pekerja 0.7000 OH 65,000.00 45,500.00
Tukang Batu 0.3500 OH 80,000.00 28,000.00
Kepala Tukang 0.0350 OH 90,000.00 3,150.00
Mandor 0.0350 OH 100,000.00 3,500.00
Sub jumlah 80,150.00
BAHAN :
Batu Tempel Hitam 1.1000 m2 #NAME? #NAME?
Semen Abu-abu 11.7500 kg 1,460.00 17,155.00
Pasir Pasang 0.0350 m3 #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.45 1 M1 PASANG LISTPLANK GRC 20 CM
UPAH :
Pekerja 0.1000 OH 65,000.00 6,500.00
Tukang Kayu 0.2000 OH 80,000.00 16,000.00
Kepala Tukang 0.0200 OH 90,000.00 1,800.00
Mandor 0.0050 OH 100,000.00 500.00
Sub jumlah 24,800.00
BAHAN :
Listplank GRC 1.0000 m' 15,000.00 15,000.00
Paku Biasa 2" - 5" 0.0500 kg #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.46 MEMASANG 1 BUAH BAK KONTROL PAS. BATU BATA (30X30) TINGGI 35 CM ANALISA PU
UPAH :
Pekerja 2.1600 OH 65,000.00 140,400.00
Tukang Batu 0.7200 OH 80,000.00 57,600.00
Kepala Tukang 0.0720 OH 90,000.00 6,480.00
Mandor 0.0110 OH 100,000.00 1,100.00
Sub jumlah 205,580.00
BAHAN :
Batu Bata 40.0000 bh #NAME? #NAME?
Semen Portland 44.0000 kg 1,460.00 64,240.00
Pasir Pasang 0.0700 m3 #NAME? #NAME?
Batu Kerikil 0.0700 m3 #NAME? #NAME?
Besi beton 1.6000 kg #NAME? #NAME?
Pasir Beton 0.0600 m3 #NAME? #NAME?
Sub jumlah #NAME?
1 2 3 4 5 6=(3x5)
PERALATAN :
Sub jumlah -
1 2 3 4 5 6=(3x5)
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.47 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5" ANALISA PU
UPAH :
Pekerja 0.0360 OH 65,000.00 2,340.00
Tukang Batu 0.0600 OH 80,000.00 4,800.00
Kepala Tukang 0.0060 OH 90,000.00 540.00
Mandor 0.0020 OH 100,000.00 200.00
Sub jumlah 7,880.00
BAHAN :
Pipa PVC 1.2000 m' #NAME? #NAME?
Perlengkapan 0.3500 hrg pipa #NAME? #NAME?
Sub jumlah #NAME?
PERALATAN :
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.48 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2" ( ABU ) ANALISA PU
UPAH :
Pekerja 0.0540 OH 65,000.00 3,510.00
Tukang Batu 0.0900 OH 80,000.00 7,200.00
Kepala Tukang 0.0090 OH 90,000.00 810.00
Mandor 0.0030 OH 100,000.00 300.00
Sub jumlah 11,820.00
BAHAN :
Pipa PVC 1.2000 m' 14,166.67 17,000.00
Perlengkapan 0.3500 hrg pipa 14,166.67 4,958.33
Sub jumlah 21,958.33
PERALATAN :
Sub jumlah -
Jumlah 33,778.33
Keuntungan Max. 10 % 3,377.83
Jumlah Total 37,156.17
Dibulatkan 37,156.00
A.49 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" ANALISA PU
UPAH :
Pekerja 0.0100 OH 65,000.00 650.00
Tukang Batu 0.4000 OH 80,000.00 32,000.00
Kepala Tukang 0.0400 OH 90,000.00 3,600.00
Mandor 0.0050 OH 100,000.00 500.00
Sub jumlah 36,750.00
BAHAN :
Kran Air 1.0000 bh 85,000.00 85,000.00
Seal tape 0.0250 bh 3,000.00 75.00
Sub jumlah 85,075.00
PERALATAN :
Sub jumlah -
Jumlah 121,825.00
Keuntungan Max. 10 % 12,182.50
Jumlah Total 134,007.50
Dibulatkan 134,008.00
A.50 MEMASANG 1 BH FLOOR DRAIN ANALISA PU
1 2 3 4 5 6=(3x5)
UPAH :
Pekerja 0.0100 OH 65,000.00 650.00
Tukang Batu 0.1000 OH 80,000.00 8,000.00
Kepala Tukang 0.0100 OH 90,000.00 900.00
Mandor 0.0050 OH 100,000.00 500.00
Sub jumlah 10,050.00
1 2 3 4 5 6=(3x5)
BAHAN :
Floordrain 1.0000 bh 90,000.00 90,000.00
Sub jumlah -
Jumlah 100,050.00
Keuntungan Max. 10 % 10,005.00
Jumlah Total 110,055.00
Dibulatkan 110,055.00
A.51 1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN
Galian Tanah 0.2000 m³ 51,250.00 10,250.00
Grefel Beton 30 Cm X 1/2 1.0000 bh 65,000.00 65,000.00
Pas . Bata + Plesteran 1 : 3 1.0000 m1 #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.52 1 M1 SALURAN L = 40 CM + PLAT DECKER
Galian Tanah 1.2000 m³ 51,250.00 61,500.00
Pas. Batu Belah 0.7600 m³ #NAME? #NAME?
Pek. Siaran 1.6000 m2 #NAME? #NAME?
Adukan Beton K 225 0.0900 m³ #NAME? #NAME?
Besi beton 11.1600 kg #NAME? #NAME?
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.53 1 KG PEKERJAAN BAJA IWF EX DN ANALISA PU
UPAH :
Pekerja Terampil 0.0600 OH 65,000.00 3,900.00
Tukang besi 0.0600 OH 80,000.00 4,800.00
Kepala tukang 0.0060 OH 90,000.00 540.00
Mandor 0.0030 OH 100,000.00 300.00
Sub jumlah 9,540.00
BAHAN :
Besi IWF ex DN SII 1.1500 kg 10,250.00 11,787.50
Zincromate 1.0000 ls 1,178.75 1,178.75
Sub jumlah 12,966.25
PERALATAN :
Sub jumlah -
Jumlah 22,506.25
Keuntungan Max. 10 % 2,250.63
Jumlah Total 24,756.88
Dibulatkan 24,757.00
A.54 100 KG PEKERJAAN PERAKITAN BAJA ANALISA PU
UPAH :
Pekerja Terampil 0.1000 OH 65,000.00 6,500.00
Tukang besi 0.1000 OH 80,000.00 8,000.00
Kepala tukang 0.0010 OH 90,000.00 90.00
Mandor 0.0050 OH 100,000.00 500.00
Sub jumlah 15,090.00
BAHAN :
Solar 1.0000 ltr 7,000.00 7,000.00
Minyak Pelumas 0.1000 ltr 41,000.00 4,100.00
Sub jumlah 11,100.00
PERALATAN :
Sewa Alat 0.8000 jam 155,000.00 124,000.00
1 2 3 4 5 6=(3x5)
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.56 1 M2 PENGECATAN BIDANG KAYU BARU (1 PLAMUR, 1 CAT DASAR, 2 CAT PENUTUP)
UPAH :
Pekerja 0.0700 OH 65,000.00 4,550.00
Tukang 0.0090 OH 80,000.00 720.00
Kepala Tukang 0.0060 OH 90,000.00 540.00
Mandor 0.0030 OH 100,000.00 300.00
Sub jumlah 6,110.00
BAHAN :
Meni kayu 0.2000 kg #NAME? #NAME?
Plamir kayu 0.1500 kg 14,000.00 2,100.00
Cat Dasar 0.1700 kg 52,000.00 8,840.00
Cat Penutup 0.2600 kg #NAME? #NAME?
Amplas kayu 0.2000 lbr #NAME? #NAME?
Minyak cat terpentin 0.0300 ltr #NAME? #NAME?
Kwas 3" 0.0100 bh #NAME? #NAME?
Sub jumlah #NAME?
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
Dibulatkan #NAME?
A.57 1 M2 PENGECATAN BESI
UPAH :
Pekerja 0.0700 OH 65,000.00 4,550.00
Tukang 0.0090 OH 80,000.00 720.00
Kepala Tukang 0.0060 OH 90,000.00 540.00
Mandor 0.0030 OH 100,000.00 300.00
Sub jumlah 6,110.00
BAHAN :
Meni 0.2000 kg #NAME? #NAME?
Cat Penutup 0.2600 kg #NAME? #NAME?
Amplas 0.2000 lbr #NAME? #NAME?
Tiner 0.0300 ltr 23,000.00 690.00
Kwas 3" 0.0100 bh #NAME? #NAME?
Sub jumlah #NAME?
Sub jumlah -
Jumlah #NAME?
Keuntungan Max. 10 % #NAME?
Jumlah Total #NAME?
1 2 3 4 5 6=(3x5)
Dibulatkan #NAME?
1 2 3 4 5 6=(3x5)
A.58 1 BUAH LAMPU TL 40 Watt (LENGKAP)
BAHAN :
Lampu TL (Lengkap) 1.0000 bh 125,000.00 125,000.00
Sub jumlah 125,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
Jumlah 141,000.00
Keuntungan Max. 10 % 14,100.00
Jumlah Total 155,100.00
Dibulatkan 155,100.00
A.59 1 BUAH LAMPU DOWN LIGHT
BAHAN :
Lampu Down Light (lengkap) 1.0000 bh 145,000.00 145,000.00
Sub jumlah 145,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
Jumlah 161,000.00
Keuntungan Max. 10 % 16,100.00
Jumlah Total 177,100.00
Dibulatkan 177,100.00
A.60 1 BUAH LAMPU SL
BAHAN :
Lampu SL (lengkap) 1.0000 bh 40,000.00 40,000.00
Sub jumlah 40,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
Jumlah 56,000.00
Keuntungan Max. 10 % 5,600.00
Jumlah Total 61,600.00
Dibulatkan 61,600.00
A.61 1 BUAH LAMPU BARET
BAHAN :
Lampu Baret 24 Watt (Lengkap) 1.0000 bh 400,000.00 400,000.00
Sub jumlah 400,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
Jumlah 416,000.00
Keuntungan Max. 10 % 41,600.00
Jumlah Total 457,600.00
Dibulatkan 457,600.00
A.62 1 BUAH STOP KONTAK
BAHAN :
Stop Kontak 1.0000 bh 30,000.00 30,000.00
Sub jumlah 30,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
Jumlah 46,000.00
Keuntungan Max. 10 % 4,600.00
Jumlah Total 50,600.00
Dibulatkan 50,600.00
A.63 1 BUAH SAKLAR
BAHAN :
Saklar 1.0000 bh 30,000.00 30,000.00
Sub jumlah 30,000.00
UPAH :
Tukang Listrik 0.2000 Oh 80,000.00 16,000.00
Sub jumlah 16,000.00
1 2 3 4 5 6=(3x5)
Jumlah 46,000.00
Keuntungan Max. 10 % 4,600.00
Jumlah Total 50,600.00
Dibulatkan 50,600.00
ANALISA HARGA SATUAN
PEKERJAAN PINTU DAN JENDELA
1 PG 1 Unit
Spesifikasi sebagai berikut :
a. Ukuran : 230x265 Cm
b. Kusen :
Aluminium Profil 1.35x40x100 Mm Silver ex. Alexindo m1 18.200 #REF! #REF!
c. Daun Pintu : -
Pintu Kaca Rangka Alumunium m2 2.940 #REF! #REF!
d. Daun Jendela : -
Kaca Polos 5 mm Rangka Aluminium m2 1.330 450,000.00 598,500.00
e. Kaca -
Kaca Polos 5 mm m2 0.880 #REF! #REF!
f. Handle : -
Pull Handle ex. Dekkson PH D 855 19X152 AB psg 2.000 400,000.00 800,000.00
Casement Handle ex. Dekkson-CH-428-NLOCK-RNA bh 2.000 35,000.00 70,000.00
f. Kunci : -
Lockcase ex. Dekkson-MTS-L-DKS-8485-RL SN +DC-60mm-SN set 1.00 300,000.00 300,000.00
g. Penggantung : -
Engsel ex. Dekkson-ES-S/S-DL-4'X3'X3MM-2BB psg 3.00 145,000.00 435,000.00
Friction Stay ex. Dekkson-FS-DEK-10" psg 2.00 95,000.00 190,000.00
h. Aksesoris : -
Door Stoper ex. Dekkson DKS-886-SN bh 2.00 45,000.00 90,000.00
i. Penguat Engsel : Kayu Kamper 50/70 (setinggi pintu) m3 0.02 #REF! #REF!
TOTAL HARGA SATUAN PG #REF!
1 2 3
1 A.01 1 M2 PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M Rp. #NAME?
2 A.02 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK Rp. #NAME?
3 A.03 1 M2 PEMBUATAN GUDANG SEMEN DAN PERALATAN Rp. #NAME?
4 A.04 1 M2 PEMBERSIHAN LAPANGAN DAN PERATAAN Rp. 12,650.00
5 A.05 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M Rp. 56,375.00
6 A.06 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M Rp. 69,300.00
7 A.07 1 M2 PEKERJAAN STRIPING TANAH Rp. 4,125.00
8 A.08 1 M3 URUGAN TANAH KEMBALI Rp. 41,250.00
9 A.09 1 M3 MEMADATKAN TANAH ( PER 20 CM) Rp. 41,250.00
10 A.10 1 M3 URUGAN PASIR URUG Rp. #NAME?
11 A.11 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps Rp. #NAME?
12 A.12 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps Rp. #NAME?
13 A.13 1 M3 PASANG AANSTAMPING BATU KOSONG Rp. #NAME?
14 A.14 1 M3 MEMBUAT ADUKAN LANTAI KERJA f'c = 7.4 Mpa (K 100) Rp. #NAME?
15 A.15 1 M3 MEMBUAT ADUKAN BETON f'c = 7.4 Mpa (K 100) Rp. #NAME?
16 A.16 1 M3 MEMBUAT ADUKAN BETON f'c = 14.5 Mpa (K 175) Rp. #NAME?
17 A.17 1 M3 MEMBUAT ADUKAN BETON f'c = 19.3 Mpa (K 225) Rp. #NAME?
18 A.18 1 M3 MEMBUAT ADUKAN BETON f'c = 21.7 Mpa (K 250) Rp. #NAME?
19 A.19 10 Kg BESI BETON TERPASANG Rp. #NAME?
20 A.20 1 M2 BEKISTING UNTUK PONDASI Rp. #NAME?
21 A.21 1 M2 BEKISTING UNTUK SLOOF Rp. #NAME?
22 A.22 1 M2 BEKISTING UNTUK KOLOM Rp. #NAME?
23 A.23 1 M2 BEKISTING UNTUK BALOK Rp. #NAME?
24 A.24 1 M2 BEKISTING UNTUK PLAT LANTAI Rp. #NAME?
25 A.25 1 M3 KOLOM BETON PRAKTIS uk. 11/11 K. 175 Rp. #NAME?
26 A.26 1 M3 KOLOM BETON uk. 20/20 K. 225 Rp. #NAME?
27 A.27 1 M3 KOLOM BETON uk. 30/40 K. 225 Rp. #NAME?
28 A.28 1 M3 SLOOF BETON uk. 15/20 K. 175 Rp. #NAME?
29 A.29 1 M3 SLOOF BETON uk. 20/30 K. 225 Rp. #NAME?
30 A.30 1 M3 RINGBALK BETON uk. 15/20 K. 175 Rp. #NAME?
31 A.31 1 M3 PLAT BETON t = 7 cm K. 225 Rp. #NAME?
32 A.32 1 M3 PLAT BETON t = 10 cm K. 225 Rp. #NAME?
33 A.33 1 M3 PLAT BETON t = 12 cm K. 225 Rp. #NAME?
34 A.34 1 M3 PONDASI PLAT BETON SETEMPAT K. 225 Rp. #NAME?
35 A.35 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps Rp. #NAME?
36 A.36 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM + ACIAN Rp. #NAME?
37 A.37 1 M2 PASANGAN SIARAN ad. 1 : 2 Rp. #NAME?
38 A.38 1 M2 PASANGAN ACIAN Rp. 30,410.00
NO. URAIAN JUMLAH
1 2 3
39 A.39 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM Rp. #NAME?
40 A.40 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM Rp. #NAME?
41 A.41 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM Rp. #NAME?
NO. URAIAN JUMLAH
1 2 3
42 A.42 1 M2 PASANG DINDING KERAMIK 20 X 25 CM, Rp. #NAME?
43 A.43 1 M2 PASANGAN PAVING BLOCK WARNA T = 6 CM Rp. #NAME?
44 A.44 1 M2 PASANG DINDING BATU TEMPEL Rp. #NAME?
45 A.45 1 M1 PASANG LISTPLANK GRC 20 CM Rp. #NAME?
46 A.46 MEMASANG 1 BUAH BAK KONTROL PAS. BATU BATA (30X30) TINGGI 35 CM Rp. #NAME?
47 A.47 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5" Rp. #NAME?
48 A.48 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2" ( ABU ) Rp. 37,156.00
49 A.49 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" Rp. 134,008.00
50 A.50 MEMASANG 1 BH FLOOR DRAIN Rp. 110,055.00
51 A.51 1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN Rp. #NAME?
52 A.52 1 M1 SALURAN L = 40 CM + PLAT DECKER Rp. #NAME?
53 A.53 1 KG PEKERJAAN BAJA IWF EX DN Rp. 24,757.00
54 A.54 100 KG PEKERJAAN PERAKITAN BAJA Rp. 165,209.00
55 A.55 1 M2 PENGECATAN DINDING/PLAFOND BARU ( 1 PLAMUR, 2 CAT DASAR, 2 CAT PENUTUP) Rp. #NAME?
56 A.56 1 M2 PENGECATAN BIDANG KAYU BARU (1 PLAMUR, 1 CAT DASAR, 2 CAT PENUTUP) Rp. #NAME?
57 A.60 1 M2 PENGECATAN BESI Rp. #NAME?
58 A.58 1 BUAH LAMPU TL 40 Watt (LENGKAP) Rp. 155,100.00
59 A.59 1 BUAH LAMPU DOWN LIGHT Rp. 177,100.00
60 A.60 1 BUAH LAMPU SL Rp. 61,600.00
61 A.61 1 BUAH LAMPU BARET Rp. 457,600.00
62 A.62 1 BUAH STOP KONTAK Rp. 50,600.00
63 A.63 1 BUAH SAKLAR Rp. 50,600.00
RENCANA ANGGARAN BIAYA
KEGIATAN : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA
PUSKESMAS/PUSTU DAN JARINGANNYA
PEKERJAAN : PEMBANGUNAN PUSKESMAS AGRABINTA KECAMATAN AGRABINTA
SATKER : DINAS KESEHATAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' 76.00 #NAME? #NAME?
2 Pembuatan Papan Nama proyek ls 1.00 300,000.00 300,000.00
3 Sewa Direksikeet ls 1.00 2,000,000.00 2,000,000.00
4 Administrasi, Perijinan IMB dan Dokumentasi ls 1.00 1,000,000.00 1,000,000.00
5 Bongkaran ls 1.00 2,000,000.00 2,000,000.00
Sub Jumlah #NAME?
B PEKERJAAN LANTAI I
I PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 68.41 56,375.00 3,856,613.75
2 Pek. Galian Tanah untuk pondasi maks. 2 m m3 109.44 69,300.00 7,584,192.00
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 77.68 41,250.00 3,204,258.75
4 Pek. Urugan Tanah dibawah lantai dipadatkan m3 71.40 41,250.00 2,945,250.00
5 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 17.25 #NAME? #NAME?
Sub Jumlah #NAME?
II PEKERJAAN TEMBOKAN
1 Pas. Aanstamping m3 9.75 #NAME? #NAME?
2 Pek. Pondasi Batu Belah ad 1:5 m3 28.60 #NAME? #NAME?
3 Pek. Pondasi Foot Plat m3 16.56 #NAME? #NAME?
4 Pek. Sloof Beton 15/20 m3 3.38 #NAME? #NAME?
5 Pek. Sloof Beton 20/30 m3 5.55 #REF! #REF!
6 Pek. Kolom Praktis 12/12 m3 1.07 #NAME? #NAME?
7 Pas. Kolom 20/20 m3 0.89 #NAME? #NAME?
8 Pas. Kolom 30/30 m3 10.66 #NAME? #NAME?
9 Pas. Balok Beton 20/40 m3 7.04 #REF! #REF!
10 Pas. Balok Beton 15/30 m3 9.02 #REF! #REF!
11 Pek. Plat Lantai Beton t = 12 cm m3 26.28 #NAME? #NAME?
12 Pek. Dak Beton t = 10 cm m3 6.30 #NAME? #NAME?
13 Pek. Listplank Beton t = 5 cm m3 0.48 #NAME? #NAME?
14 Pek. Topi Beton m3 0.56 #NAME? #NAME?
15 Pek. Plat Tangga Beton m3 1.89 #NAME? #NAME?
16 Pek. Meja Beton m3 0.42 #NAME? #NAME?
17 Pek. Balok Lintel 12/15 m3 0.80 #REF! #REF!
18 Pek. Dinding Bata m2 616.27 #NAME? #NAME?
19 Pek. Plesteran + Acian 1 : 5 m2 1,232.54 #NAME? #NAME?
20 Pek. Lantai Rabat Beton ad 1:3:5 + acian m3 2.71 #NAME? #NAME?
21 Pas. Lantai Keramik uk 20 x 20 cm DN m2 13.50 #NAME? #NAME?
22 Pas. Lantai Keramik uk 40 x 40 cm DN m2 268.50 #NAME? #NAME?
23 Pas. Dinding Keramik uk 20 x 25 cm DN m2 73.95 #NAME? #NAME?
Sub Jumlah #NAME?
III PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Besi Hollow Galvanis m2 268.00 #REF! #REF!
2 Pas. Plafond Gypsum 9 mm m2 243.00 #REF! #REF!
3 Pas. Plafond GRC 4 mm m2 25.00 #REF! #REF!
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
4 Pek. List Plafond Gypsum (Plafond Gypsum ) m1 433.00 #REF! #REF!
5 Pek. List Plafond Kayu (Plafond GRC ) m1 81.00 #REF! #REF!
Sub Jumlah #REF!
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
IV PEKERJAAN ALUMUNIUM
1 Pas. Pintu type PG1, Alumuium 4" Silver unit 1.00 #REF! #REF!
2 Pas. Pintu type P1, Alumuium 4" Silver unit 2.00 #REF! #REF!
3 Pas. Pintu type P2, Alumuium 4" Silver unit 13.00 #REF! #REF!
4 Pas. Pintu type P3, Alumuium 4" Silver unit 5.00 #REF! #REF!
5 Pas. Pintu type P4, Alumuium 4" Silver unit - #REF! #REF!
6 Pas. Pintu type P5, Alumuium 4" Silver unit #REF!
7 Pas. Jendela type J2, Alumuium 4" Silver unit 11.00 #REF! #REF!
8 Pas. Jendela type J3, Alumuium 4" Silver unit #REF!
9 Pas. Jendela type J4, Alumuium 4" Silver unit 1.00 #REF! #REF!
10 Pas. Bouvenlight BV1, Alumunium 4" Silver unit 3.00 #REF! #REF!
11 Pas. Bouvenlight BV2, Alumunium 4" Silver unit 3.00 #REF! #REF!
12 Pas. Bouvenlight BV3, Alumunium 4" Silver unit #REF!
Sub Jumlah #REF!
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 1,232.54 #NAME? #NAME?
2 Pek. Pengecatan Plafond 3x m2 293.00 #NAME? #NAME?
Sub Jumlah #NAME?
VI PEKERJAAN SANITARY
1 Pas. Closet Jongkok bh 5.00 #REF! #REF!
2 Pas. Floor Drain Stainles bh 5.00 #REF! #REF!
3 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh 3.00 #REF! #REF!
4 Pas. Kran Air dia. 1/2" bh 5.00 #REF! #REF!
5 Pas. Tempat Sabun Keramik bh 3.00 65,450.00 196,350.00
6 Pas. Wastafel lengkap bh 8.00 #REF! #REF!
7 Pas. Spoel Hook , sek TOTO ( lengkap assesories ) unit 1.00 10,000,000.00 10,000,000.00
8 Pas. Sumur bor + Pompa unit 1.00 11,250,000.00 11,250,000.00
9 Pek. Rumah Pompa lengkap aksesoris unit 1.00 1,000,000.00 1,000,000.00
10 Pek. Septiktank uk. 1.5 x 1 x 1.5 m unit 2.00 4,571,636.00 9,143,272.00
- bangunan septiktank
- valve, fitting & aksesoris
- pemipaan septiktank & bidang resapan
- galian & urugan
- bak kontrol
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
2 Pas. Pipa PVC AW dia. 3" sek. Maspion m' 24.00 #REF! #REF!
3 Pas. Pipa PVC AW dia. 2" sek. Maspion m' 16.00 #REF! #REF!
Sub Jumlah #REF!
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
C PEKERJAAN LANTAI II ###
I PEKERJAAN TEMBOKAN
1 Pek. Kolom Praktis 12/12 m3 0.91 #NAME? #NAME?
2 Pas. Kolom 30/30 m3 6.30 #NAME? #NAME?
3 Pek. Plat Lantai Beton m3 0.72 #NAME? #NAME?
4 Pek. Balok/Ringbalk beton bertulang 15/20 m3 3.51 #NAME? #NAME?
5 Pek. Meja Beton m3 0.08 #NAME? #NAME?
6 Pek. Balok Lintel 12/15 m3 0.60 #REF! #REF!
7 Pek. Dinding Bata m2 434.34 #NAME? #NAME?
8 Pek. Plesteran + Acian 1 : 5 m 840.78 #NAME? #NAME?
9 Pas. Lantai Keramik uk 20 x 20 cm DN m2 9.00 #NAME? #NAME?
10 Pas. Lantai Keramik uk 40 x 40 cm DN m2 210.00 #NAME? #NAME?
11 Pas. Dinding Keramik uk 20 x 25 cm DN m2 27.90 #NAME? #NAME?
Sub Jumlah #NAME?
II PEKERJAAN PLAFOND ###
1 Pek. Rangka Plafond Besi Hollow Galvanis m2 303.00 #REF! #REF!
2 Pas. Plafond Gypsum 9 mm m2 231.00 #REF! #REF!
3 Pas. Plafond GRC 4 mm m2 72.00 #REF! #REF!
4 Pek. List Plafond Gypsum (Plafond Gypsum ) m' 205.00 #REF! #REF!
5 Pek. List Plafond Kayu ( Plafond GRC ) m' 128.00 #REF! #REF!
Sub Jumlah #REF!
III PEKERJAAN ALUMUNIUM
1 Pas. Pintu type P1, Alumuium 4" Silver unit 2.00 #REF! #REF!
2 Pas. Pintu type P2, Alumuium 4" Silver unit 5.00 #REF! #REF!
3 Pas. Pintu type P3, Alumuium 4" Silver unit 3.00 #REF! #REF!
Pas. Pintu type P4, Alumuium 4" Silver unit #REF! #REF!
4 Pas. Jendela type J2, Alumuium 4" Silver unit 1.00 #REF! #REF!
5 Pas. Jendela type J3, Alumuium 4" Silver unit 12.00 #REF! #REF!
Pas. Jendela type J4, Alumuium 4" Silver unit #REF! #REF!
Pas. Bouvenlight BV1, Alumunium 4" Silver unit #REF! #REF!
Pas. Bouvenlight BV2, Alumunium 4" Silver unit #REF! #REF!
6 Pas. Bouvenlight BV3, Alumunium 4" Silver unit 6.00 #REF! #REF!
Sub Jumlah #REF!
IV PEKERJAAN PENUTUP ATAP
1 Pas. Rangka Atap Baja Ringan m2 359.55 160,000.00 57,528,000.00
3 Pas. Alumunium Foil m2 359.55 14,500.00 5,213,475.00
4 Pas. Atap Genteng Morando m2 359.55 #REF! #REF!
5 Pas. Bubungan Genteng Morando m' 46.50 #REF! #REF!
6 Pas. Listplank Kayu Berprofil m' 72.00 225,000.00 16,200,000.00
Sub Jumlah #REF!
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 840.78 #NAME? #NAME?
2 Pek. Pengecatan Plafond 3x m2 375.00 #NAME? #NAME?
3 Pek. Pengecatan Listplank GRC m2 14.80 #NAME? #NAME?
Sub Jumlah #NAME?
VI PEKERJAAN SANITARY ###
1 Pas. Closet Duduk unit 1.00 #REF! #REF!
2 Pas. Closet Jongkok bh 2.00 #REF! #REF!
3 Pas. Floor Drain Stainles bh 3.00 #REF! #REF!
4 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh 3.00 #REF! #REF!
5 Pas. Kran Air dia. 1/2" bh 4.00 #REF! #REF!
6 Pas. Jet Washer bh 1.00 225,000.00 225,000.00
7 Pas. Tempat Sabun Keramik bh 3.00 65,450.00 196,350.00
8 Pas. Wastafel lengkap bh 1.00 #REF! #REF!
9 Pas. Bak Cuci piring 1 lobang Stainless steel bh 1.00 #REF! #REF!
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
10 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris bh 1.00 2,000,000.00 2,000,000.00
Sub Jumlah #REF!
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
VII PEKERJAAN LISTRIK ###
1 Pek. Instlalasi Penerangan (bahan+upah) ttk 25.00 170,000.00 4,250,000.00
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk 9.00 170,000.00 1,530,000.00
3 Pas. Lampu TL 20 watt + aksesoris Philips bh 9.00 155,100.00 1,395,900.00
4 Pas. Lampu SL bh 16.00 61,600.00 985,600.00
5 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh 9.00 50,600.00 455,400.00
6 Pas. Saklar Ganda , sek. Broco bh 4.00 50,600.00 202,400.00
7 Pas. Saklar Tunggal, sek. Broco bh 7.00 50,600.00 354,200.00
8 Pas. Box MCB + MCB 6 Group bh 1.00 450,000.00 450,000.00
Sub Jumlah 9,623,500.00
VIII PEKERJAAN PLUMBING ###
a. Pekerjaan Pipa Air Bersih
1 Pas. Pipa PVC AW dia. 1" sek. Maspion m' 12.00 #REF! #REF!
2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' 24.00 #REF! #REF!
3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' 32.00 #REF! #REF!
b. Pekerjaan Pipa Air bekas , Air kotor & vent
1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' 12.00 #REF! #REF!
2 Pas. Pipa PVC AW dia. 3" sek. Maspion m' 16.00 #REF! #REF!
Sub Jumlah #REF!
D PEKERJAAN PAGAR
I PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 73.60 56,375.00 4,149,200.00
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 25.76 41,250.00 1,062,600.00
3 Pek. Pondasi Batu Belas ad 1:5 m3 31.68 #NAME? #NAME?
4 Pek. Sloof Beton 15/20 m3 3.96 #NAME? #NAME?
5 Pas. Kolom 20/20 m3 2.64 #NAME? #NAME?
6 Pek. Dinding Bata 1 : 5 m2 132.00 #NAME? #NAME?
7 Pek. Plesteran + Acian 1 : 5 m2 264.00 #NAME? #NAME?
8 Pek. Balok/Ringbalk beton bertulang 15/20 m3 3.60 #NAME? #NAME?
9 Pek. Pagar Besi Hollow m' 30.00 550,000.00 16,500,000.00
10 Pek. Pintu Pagar Besi Hollow bh 2.00 4,500,000.00 9,000,000.00
Sub Jumlah
II PEKERJAAN LAPANGAN PARKIR
1 Pek. Striping Tanah m2 1.00 4,125.00 4,125.00
2 Pas. Lapis Pondasi Bawah m3 86.40 #REF! #REF!
3 Pas. Lapis Pondasi Atas m3 64.80 #REF! #REF!
4 Pas. Lapis Penetrasi m2 432.00 #REF! #REF!
A PEKERJAAN PERSIAPAN
1 Pengukuran & Pasang Bouwplank 114.00 ls #NAME? #NAME?
2 Pembuatan Dreksikeet 1.00 ls 5,000,000.00 5,000,000.00
3 Mobilisasi Alat Dan Bahan 1.00 ls 25,000,000.00 25,000,000.00
4 Administrasi, Perijinan Dan Dokumentasi 1.00 ls 2,000,000.00 2,000,000.00
5 Pengadaan Listrik Kerja 1.00 ls 1,000,000.00 1,000,000.00
6 Pengadaan Air Kerja 1.00 ls 1,000,000.00 1,000,000.00
7 Pas. Pagar Pengaman Proyek 44.00 m' #NAME? #NAME?
8 Pembersihan Area Bekas Pekerjaan 1.00 ls 2,000,000.00 2,000,000.00
Sub Jumlah #NAME?
B LANTAI 1
I PEKERJAAN TANAH
1 Pek. Urugan Tanah (Bahan dari luar) 2,362.50 m3 - -
2 Pek. Galian Tanah 186.00 m3 69,300.00 12,889,800.00
3 Pek. Urugan Tanah Kembali 120.90 m3 41,250.00 4,987,125.00
4 Pek. Urugan Tanah Peninggian Lantai ( Tinggi 20 cm ) 108.00 m3 41,250.00 4,455,000.00
5 Pek. Urugan Pasir Bawah Lantai 30.60 m3 #NAME? #NAME?
-
Sub Jumlah #NAME?
II PEKERJAAN BETON DAN TEMBOKAN
1 Aanstamping Batu Kali ( 1: 5 ) 5.67 m3 #NAME? #NAME?
2 Pondasi Batu Kali ( 1 : 5 ) 14.70 m3 #NAME? #NAME?
3 Pondasi Setempat uk. 150 x 150 cm 25.20 m3 #NAME? #NAME?
4 Pondasi Setempat uk. 100 x 100 cm 1.20 m3 #NAME? #NAME?
5 Kolom Pedestal uk. 45/45 17.20 m3 #REF! #REF!
6 Kolom Pedestal uk. 25/25 0.19 m3 #REF! #REF!
7 Sloof BS1 ( 20/40 ) 33.60 m3 #REF! #REF!
8 Balok 25/50 35.63 m3 #REF! #REF!
9 Balok 15/30 8.69 m3 - -
10 Kolom uk. 45/45 32.00 m3 - -
11 Kolom uk. 25/25 0.64 m3 #NAME? #NAME?
12 Lantai Beton t = 12 cm 73.44 m3 #NAME? #NAME?
13 Pas.Dinding 1/2 Bata ( 1 : 5 ) 511.36 m2 #NAME? #NAME?
14 Plesteran dan aci ( 1 : 5 ) 1,022.72 m2 #NAME? #NAME?
15 Acian Kolom Exposed 224.00 m2 30,410.00 6,811,840.00
16 Kolom Praktis uk. 12/12 cm 1.97 m3 #NAME? #NAME?
17 Topi Beton t = 7 cm 1.32 m3 #NAME? #NAME?
18 Balok Lintel 1.91 m3 - -
19 Meja Beton Los 0.13 m3 #NAME? #NAME?
20 Lantai Keramik uk. 60 x 60 cm 585.00 m2 - -
21 Pas. Lantai Keramik uk. 20 x 20 cm 27.00 m2 #NAME? #NAME?
22 Pas. Dinding Keramik uk. 20 x 25 cm 78.60 m2 #REF! #REF!
23 Pas. Dinding Batu Alam 21.00 m2 #NAME? #NAME?
24 Lantai Kerja tebal = 5 cm 30.94 m3 #NAME? #NAME?
Hal 52
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
3 Pas. Kusen Pintu Alumunium P2 Silver 4" 5.00 Unit #REF! #REF!
4 Pas. Kusen Pintu Alumunium P3 Silver 4" 6.00 Unit #REF! #REF!
5 Pas. Jendela Alumunium JP Silver 4" 2.00 Unit #REF! #REF!
6 Pas. Jendela Alumunium JU Silver 4" 1.00 Unit #REF! #REF!
7 Pas. Kusen Jendela Alumunium J2 Silver 4" 6.00 Unit #REF! #REF!
8 Pas. Kusen Jendela Alumunium J3 Silver 4" 13.00 Unit #REF! #REF!
9 Pas. Kusen Bouvenlight Alumunium BV1 Silver 4" 8.00 Unit #REF! #REF!
10 Pas. Railling Tangga 15.20 m' 650,000.00 9,880,000.00
Hal 53
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
Hal 54
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
Hal 55
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
II POS SATPAM
III KANTIN
Hal 56
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG DAN REVITALISASI PUSKESMAS MAMPU PONED
PEKERJAAN : PEMBANGUNAN LANJUTAN PUSKESMAS PUSAKASARI
KABUPATEN CIANJUR
SATKER : DINAS KESEHATAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016
A PEKERJAAN PERSIAPAN
1 Sewa Dreksikeet 1.00 ls 500,000.00 500,000.00
2 Administrasi, Perijinan Dan Dokumentasi 1.00 ls 1,000,000.00 1,000,000.00
3 Pengadaan Listrik Kerja 1.00 ls 1,000,000.00 1,000,000.00
4 Pengadaan Air Kerja 1.00 ls 1,000,000.00 1,000,000.00
5 Pembersihan Area Bekas Pekerjaan 1.00 ls 2,000,000.00 2,000,000.00
Sub Jumlah 5,500,000.00
B LANTAI 1
I PEKERJAAN BETON DAN TEMBOKAN
1 Aanstamping Batu Kali ( 1: 5 ) m3 215,499.00 -
2 Pondasi Batu Kali ( 1 : 5 ) m3 197,410.00 -
3 Pondasi Setempat uk. 150 x 150 cm m3 1,275,120.00 -
4 Kolom Pedestal uk. 50/50 m3 1,464,265.00 -
5 Sloof BS1 ( 20/40 ) m3 3,415,399.00 -
1 Balok 25/50 m3 5,450,056.00 -
2 Balok 15/30 m3 7,269,122.00 -
3 Kolom uk. 50/50 m3 5,768,700.00 -
4 Kolom uk. 30/30 m3 4,817,753.00 -
5 Lantai Beton t = 12 cm m3 5,051,870.00 -
6 Pas.Dinding 1/2 Bata ( 1 : 5 ) m2 133,287.00 -
7 Plesteran dan aci ( 1 : 5 ) m2 65,943.00 -
8 Acian Kolom Exposed m2 28,683.00 -
9 Kolom Praktis uk. 12/12 cm m3 6,987,363.00 -
10 Topi Beton t = 7 cm m3 5,839,988.00 -
11 Balok Lintel m3 5,773,335.00 -
12 Meja Beton Los m3 5,839,988.00 -
12 Lantai Keramik uk. 40 x 40 cm m2 215,499.00 -
13 Pas. Lantai Keramik uk. 20 x 20 cm 8.00 m2 197,410.00 1,579,280.00
14 Pas. Dinding Keramik uk. 20 x 25 cm 83.85 m2 214,380.00 17,975,763.00
1 Pas. Dinding Batu Alam 18.00 m2 #NAME? #NAME?
2 Lantai Kerja tebal = 5 cm m3 922,997.00 -
II PEK. PENGECATAN
1 Pengecatan Dinding 933.02 m2 #NAME? #NAME?
2 Pengecatan Plafond 294.13 m2 #NAME? #NAME?
3 Pengecatan Kayu m2 25,553.00 -
Hal 57
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
V PEK. ELEKTRIKAL
1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 38.00 Titik 175,000.00 6,650,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 12.00 Titik 175,000.00 2,100,000.00
3 Pas. Lampu RM 2x 20 watt 13.00 bh 375,000.00 4,875,000.00
4 Pas. Lampu Down Light 14.00 bh 175,000.00 2,450,000.00
5 Saklar Tunggal 7.00 bh 50,600.00 354,200.00
6 Saklar Ganda 8.00 bh 50,600.00 404,800.00
7 Stop Kontak 12.00 bh 50,600.00 607,200.00
8 BP Listrik (Daya 9000 kwh) 1.00 unit 8,100,000.00 8,100,000.00
9 Biaya SLO 1.00 unit 2,100,000.00 2,100,000.00
10 Pas. Panel SDP 1.00 unit 11,000,000.00 11,000,000.00
Hal 58
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
VI PEKERJAAN SANITARY -
1 Pas. Closet Duduk 2.00 bh #REF! #REF!
2 Pas. Floor Drain Stainles 2.00 bh #REF! #REF!
3 Pas. Wastafel 3.00 bh #REF! #REF!
4 Pas. Bak Mandi Fiber uk. 60 x 60 motif 2.00 bh #REF! #REF!
5 Pas. Kran Air dia. 1/2" 2.00 bh #REF! #REF!
6 Pas. Kitchenzink 1.00 bh #REF! #REF!
7 Pas. Instalasi Air Kotor Pipa PVC dia 4" 8.00 m1 #REF! #REF!
8 Pas. Instalasi Air Bersih Pipa PVC dia 1/2" 32.00 m1 #REF! #REF!
9 Pas. Pompa Air 1.00 unit 2,500,000.00 2,500,000.00
10 Pas. Sumur Bor 1.00 unit 13,500,000.00 13,500,000.00
11 Pas. Septicktank 1,5 x 1 x 1,5 m + Rembesan 1.00 unit #REF! #REF!
12 Pas. Saluran Air Hujan Gravel 1/2 dia. 20 cm 96.00 m' #REF! #REF!
II PEK. PENGECATAN
1 Pengecatan Dinding 924.02 m2 #NAME? #NAME?
2 Pengecatan Plafond 303.13 m2 #NAME? #NAME?
3 Pengecatan Kayu 13.55 m2 #NAME? #NAME?
V PEK. ELEKTRIKAL
1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 23.00 Titik 175,000.00 4,025,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 14.00 Titik 175,000.00 2,450,000.00
3 Pas. Lampu RM 2x 20 watt 12.00 bh 375,000.00 4,500,000.00
4 Pas. Lampu Down Light 12.00 bh 175,000.00 2,100,000.00
5 Saklar Tunggal 9.00 bh 50,600.00 455,400.00
6 Saklar Ganda 5.00 bh 50,600.00 253,000.00
Hal 59
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
Hal 60
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
Hal 61
RENCANA ANGGARAN BIAYA
KEGIATAN : PENGEMBANGAN KAPASITAS LOGISTIK PEDAGANG DAN PERDAGANGAN
PEKERJAAN : KONTRUKSI FISIK PASAR RAKYAT CIRANJANG
SATKER : DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama proyek ls 1.00 400,000.00 400,000.00
2 Pembuatan Direksikeet m2 18.00 #NAME? #NAME?
3 Administrasi, Perijinan IMB dan Dokumentasi ls 1.00 2,500,000.00 2,500,000.00
4 Mobilisasi Alat ls 1.00 15,000,000.00 15,000,000.00
5 Pek. Pengukuran Dan Bouwplank m' 212.00 #NAME? #NAME?
Sub Jumlah #NAME?
II PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 53.06 56,375.00 2,991,257.50
2 Pek. Galian Tanah untuk pondasi maks. 2 m m3 171.07 69,300.00 11,855,289.60
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 78.36 41,250.00 3,232,152.00
4 Pek. Urugan Tanah dibawah lantai dipadatkan m3 580.80 41,250.00 23,958,000.00
5 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 145.20 #NAME? #NAME?
Sub Jumlah #NAME?
III PEKERJAAN TEMBOKAN
1 Pas. Aanstamping m3 16.50 #NAME? #NAME?
2 Pek. Pondasi Batu Belah ad 1:5 m3 70.40 #NAME? #NAME?
3 Pek. Pondasi Foot Plat m3 39.53 #NAME? #NAME?
4 Pek. Sloof Beton 20/30 m3 44.88 #NAME? #NAME?
5 Pas. Kolom 30/40 m3 10.08 #NAME? #NAME?
6 Pek. Lantai Beton
- Adukan Beton K - 175 m3 435.60 #NAME? #NAME?
- Pas. Wiremesh M 8 m2 2,904.00 74,770.00 217,132,080.00
7 Pas. Bata Merah ad 1 : 5 m2 1,176.00 #NAME? #NAME?
8 Pek. Plesteran + Acian 1 : 5 m2 2,469.60 #NAME? #NAME?
9 Pek. Kolom Praktis 11/11 m3 7.32 #NAME? #NAME?
10 Pas. Meja Beton m3 57.98 #NAME? #NAME?
11 Pas. Keramik Meja uk. 20 x 20 cm DN m2 579.84 #NAME? #NAME?
12 Pas. Keramik Lantai uk 40 x 40 cm DN m2 2,904.00 #NAME? #NAME?
Sub Jumlah #NAME?
IV PEKERJAAN BAJA
1 Pas. Kolom IWF. 300.150.6.5.9 kg 8,176.76 24,757.00 202,432,047.32
2 Pas. Balok IWF. 250.125.6.9 kg 16,759.52 24,757.00 414,915,436.64
3 Pas. Balok IWF. 200.100.5,5.8 kg 7,765.33 24,757.00 192,246,357.33
4 Pas. Balok IWF. 150.75.5.7 kg 1,610.84 24,757.00 39,879,565.88
5 Pas. Besi C 150.65.20.3,2 kg 25,383.80 24,757.00 628,426,736.60
6 Pas. Track Stang kg 2,878.26 #NAME? #NAME?
7 Pas. Silang Angin kg 1,712.64 #NAME? #NAME?
8 Pek. Erikson Baja kg 59,696.25 1,652.09 98,623,583.17
9 Pas. Base Plat bh 54.00 225,000.00 12,150,000.00
10 Pas. Baut HTB Dia. 19 mm bh 2,160.00 20,000.00 43,200,000.00
#NAME?
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 2,469.60 #NAME? #NAME?
Sub Jumlah #NAME?
VI PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk 96.00 170,000.00 16,320,000.00
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk 48.00 170,000.00 8,160,000.00
3 Pas. Lampu TL 36 watt + aksesoris Philips & Penggantung bh 96.00 350,000.00 33,600,000.00
4 Pas. Stop Kontak , sek. Broco bh 48.00 50,600.00 2,428,800.00
5 Pas. Saklar Ganda , sek. Broco bh 24.00 50,600.00 1,214,400.00
Sub Jumlah 61,723,200.00
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
VII PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek Warna m2 3,214.80 155,000.00 498,294,000.00
2 Pas. Bubungan m' 44.00 95,000.00 4,180,000.00
3 Pas. Listplank m' 360.00 65,000.00 23,400,000.00
4 Pas. Dinding Spandex + Rangka m2 104.00 220,000.00 22,880,000.00
Sub Jumlah 548,754,000.00
VIII PEKERJAAN SALURAN AIR HUJAN
1 Pas. Saluran Air Hujan Gravel 1/2 dia. 30 cm m' 220.00 #NAME? #NAME?
2 Pas. Plat Decker m3 1.08 #NAME? #NAME?
3 Pas. Pipa PVC 2" m' 352.00 37,156.00 13,078,912.00
4 Pas. Floordrain bh 48.00 110,055.00 5,282,640.00
Sub Jumlah #NAME?
RENCANA ANGGARAN BIAYA
KEGIATAN : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA
PUSKESMAS/PUSTU DAN JARINGANNYA
PEKERJAAN : PEMBANGUNAN PUSKESMAS CIBEBER KECAMATAN CIBEBER
SATKER : DINAS KESEHATAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' 76.00 70,651.00 5,369,476.00
2 Pembuatan Papan Nama proyek ls 1.00 300,000.00 300,000.00
3 Sewa Direksikeet ls 1.00 2,000,000.00 2,000,000.00
4 Administrasi, Perijinan IMB dan Dokumentasi ls 1.00 1,000,000.00 1,000,000.00
5 Bongkaran ls 1.00 2,000,000.00 2,000,000.00
Sub Jumlah 10,669,476.00
B PEKERJAAN LANTAI I
I PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 44.50 60,500.00 2,692,250.00
2 Pek. Galian Tanah untuk pondasi maks. 2 m m3 101.16 74,250.00 7,511,130.00
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 50.98 44,000.00 2,243,164.00
4 Pek. Urugan Tanah dibawah lantai dipadatkan m3 51.60 44,000.00 2,270,400.00
5 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 12.90 169,400.00 2,185,260.00
Sub Jumlah 16,902,204.00
II PEKERJAAN TEMBOKAN
1 Pas. Aanstamping m3 6.68 432,003.00 2,883,620.03
2 Pek. Pondasi Batu Belah ad 1:5 m3 19.58 833,415.00 16,318,265.70
3 Pek. Pondasi Foot Plat m3 16.56 3,780,268.00 62,601,238.08
4 Pek. Sloof Beton 15/20 m3 1.34 5,310,279.00 7,089,222.47
5 Pek. Sloof Beton 20/30 m3 11.04 5,474,598.00 60,439,561.92
6 Pek. Kolom Praktis 12/12 m3 1.23 8,992,400.00 11,019,646.66
7 Pas. Kolom 20/20 m3 1.39 7,871,053.00 10,921,086.04
8 Pas. Kolom 30/30 m3 10.66 6,912,789.00 73,662,679.58
9 Pas. Balok Beton 20/40 m3 7.04 6,257,032.00 44,049,505.28
10 Pas. Balok Beton 15/30 m3 5.22 8,027,549.00 41,903,805.78
11 Pek. Plat Lantai Beton t = 12 cm m3 26.28 5,563,799.00 146,216,637.72
12 Pek. Dak Beton t = 10 cm m3 5.10 6,448,652.00 32,888,125.20
13 Pek. Listplank Beton t = 5 cm m3 0.42 6,673,815.00 2,803,002.30
14 Pek. Topi Beton m3 0.56 6,673,815.00 3,737,336.40
15 Pek. Plat Tangga Beton m3 1.89 5,563,799.00 10,515,580.11
16 Pek. Meja Beton m3 0.42 6,673,815.00 2,803,002.30
17 Pek. Balok Lintel 12/15 m3 0.87 6,341,822.00 5,502,164.77
18 Pek. Dinding Bata m2 616.27 138,684.00 85,466,441.97
19 Pek. Plesteran + Acian 1 : 5 m2 953.09 72,908.00 69,487,521.18
20 Pek. Lantai Rabat Beton ad 1:3:5 + acian m3 5.90 894,373.00 5,276,800.70
21 Pas. Lantai Keramik uk 20 x 20 cm DN m2 18.00 222,444.00 4,003,992.00
22 Pas. Lantai Keramik uk 40 x 40 cm DN m2 295.50 225,830.00 66,732,765.00
23 Pas. Dinding Keramik uk 20 x 25 cm DN m2 243.45 217,824.00 53,029,252.80
24 Pas. Batu Tempel m2 36.00 301,499.00 10,853,964.00
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
2 Pas. Plafond Gypsum 9 mm m2 243.00 52,206.00 12,686,058.00
3 Pas. Plafond GRC 4 mm m2 25.00 41,155.00 1,028,875.00
4 Pek. List Plafond Gypsum (Plafond Gypsum ) m1 273.00 33,743.00 9,211,839.00
5 Pek. List Plafond Kayu (Plafond GRC ) m1 44.00 19,045.00 837,980.00
Sub Jumlah 48,071,012.00
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
IV PEKERJAAN ALUMUNIUM
1 Pas. Pintu type PG1, Alumuium 4" Silver unit 1.00 6,885,377.88 6,885,377.88
2 Pas. Pintu type P1, Alumuium 4" Silver unit 3.00 4,112,494.16 12,337,482.48
3 Pas. Pintu type P2, Alumuium 4" Silver unit 12.00 3,792,934.32 45,515,211.84
4 Pas. Pintu type P3, Alumuium 4" Silver unit 7.00 2,763,821.20 19,346,748.40
5 Pas. Pintu type P4, Alumuium 4" Silver unit 4.00 2,225,531.20 8,902,124.80
Pas. Pintu type P5, Alumuium 4" Silver unit 1,881,372.32 -
6 Pas. Jendela type J2, Alumuium 4" Silver unit 11.00 2,618,248.60 28,800,734.60
7 Pas. Jendela type J3, Alumuium 4" Silver unit 1.00 3,059,722.96 3,059,722.96
8 Pas. Jendela type J4, Alumuium 4" Silver unit 1.00 788,426.99 788,426.99
9 Pas. Bouvenlight BV1, Alumunium 4" Silver unit 3.00 325,582.35 976,747.05
Pas. Bouvenlight BV2, Alumunium 4" Silver 508,282.10 -
10 Pas. Bouvenlight BV3, Alumunium 4" Silver unit 3.00 817,289.70 2,451,869.10
Sub Jumlah 129,064,446.10
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 709.64 21,183.00 15,032,198.21
2 Pek. Pengecatan Plafond 3x m2 268.00 21,183.00 5,677,044.00
Sub Jumlah 20,709,242.21
VI PEKERJAAN SANITARY
1 Pas. Closet Jongkok bh 2.00 528,748.00 1,057,496.00
2 Pas. Closet Duduk bh 3.00 2,643,190.00 7,929,570.00
3 Pas. Floor Drain Stainles bh 5.00 115,610.00 578,050.00
4 Pas. Bak Mandi Fiber uk. 60 x 60 motif bh 3.00 597,850.00 1,793,550.00
5 Pas. Kran Air dia. 1/2" bh 5.00 112,076.00 560,380.00
6 Pas. Tempat Sabun Keramik bh 3.00 65,450.00 196,350.00
7 Pas. Wastafel lengkap bh 8.00 1,487,948.00 11,903,584.00
8 Pas. Spoel Hook , sek TOTO ( lengkap assesories ) unit 1.00 10,000,000.00 10,000,000.00
9 Pas. Sumur bor + Pompa unit 1.00 11,250,000.00 11,250,000.00
10 Pek. Rumah Pompa lengkap aksesoris unit 1.00 1,000,000.00 1,000,000.00
11 Pek. Septiktank uk. 1.5 x 1 x 1.5 m unit 2.00 4,232,256.00 8,464,512.00
- bangunan septiktank
- valve, fitting & aksesoris
- pemipaan septiktank & bidang resapan
- galian & urugan
- bak kontrol
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' 36.00 16,851.00 606,636.00
b. Pekerjaan Pipa Air bekas , Air kotor & vent
1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' 24.00 74,567.00 1,789,608.00
2 Pas. Pipa PVC AW dia. 3" sek. Maspion m' 24.00 52,402.00 1,257,648.00
3 Pas. Pipa PVC AW dia. 2" sek. Maspion m' 24.00 33,986.00 815,664.00
Sub Jumlah 5,183,094.00
HARGA JUMLAH
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
C PEKERJAAN LANTAI II ###
I PEKERJAAN TEMBOKAN
1 Pek. Kolom Praktis 12/12 m3 0.89 8,992,400.00 7,962,770.20
2 Pas. Kolom 30/30 m3 6.30 6,912,789.00 43,550,570.70
3 Pek. Plat Lantai Beton m3 0.72 5,563,799.00 4,005,935.28
4 Pek. Balok/Ringbalk beton bertulang 15/20 m3 4.59 7,024,372.00 32,241,867.48
5 Pek. Meja Beton m3 0.08 6,673,815.00 560,600.46
6 Pek. Balok Lintel 12/15 m3 0.64 6,341,822.00 4,052,424.26
7 Pek. Dinding Bata m2 444.24 138,684.00 61,608,980.16
8 Pek. Plesteran + Acian 1 : 5 m 888.48 72,908.00 64,777,299.84
9 Pas. Lantai Keramik uk 20 x 20 cm DN m2 15.00 222,444.00 3,336,660.00
10 Pas. Lantai Keramik uk 40 x 40 cm DN m2 201.00 225,830.00 45,391,830.00
11 Pas. Dinding Keramik uk 20 x 25 cm DN m2 32.70 217,824.00 7,122,844.80
12 Pas. Batu Tempel m2 12.00 301,499.00 3,617,988.00
SAT
NO. URAIAN PEKERJAAN VOL SATUAN HARGA
( Rp. ) ( Rp. )
a b c d e f = dxe
VII PEKERJAAN LISTRIK ###
1 Pek. Instlalasi Penerangan (bahan+upah) ttk 25.00 170,000.00 4,250,000.00
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk 9.00 170,000.00 1,530,000.00
3 Pas. Lampu TL 20 watt + aksesoris Philips bh 9.00 155,100.00 1,395,900.00
4 Pas. Lampu SL bh 16.00 177,100.00 2,833,600.00
5 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh 9.00 50,600.00 455,400.00
6 Pas. Saklar Ganda , sek. Broco bh 4.00 50,600.00 202,400.00
7 Pas. Saklar Tunggal, sek. Broco bh 7.00 50,600.00 354,200.00
8 Pas. Box MCB + MCB 6 Group bh 1.00 450,000.00 450,000.00
Sub Jumlah 11,471,500.00
VIII PEKERJAAN PLUMBING ###
a. Pekerjaan Pipa Air Bersih
1 Pas. Pipa PVC AW dia. 1" sek. Maspion m' 12.00 21,000.00 252,000.00
2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' 24.00 18,641.00 447,384.00
3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' 32.00 16,851.00 539,232.00
b. Pekerjaan Pipa Air bekas , Air kotor & vent
1 Pas. Pipa PVC AW dia. 4" sek. Maspion m' 12.00 74,567.00 894,804.00
2 Pas. Pipa PVC AW dia. 3" sek. Maspion m' 16.00 52,402.00 838,432.00
Sub Jumlah 2,971,852.00
D PEKERJAAN PAGAR
I PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 20.80 60,500.00 1,258,400.00
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 7.28 44,000.00 320,320.00
3 Pek. Pondasi Batu Belas ad 1:5 m3 6.24 833,415.00 5,200,509.60
4 Pek. Sloof Beton 15/20 m3 0.78 5,310,279.00 4,142,017.62
5 Pas. Kolom 20/20 m3 0.54 7,871,053.00 4,250,368.62
6 Pek. Dinding Bata 1 : 5 m2 39.00 138,684.00 5,408,676.00
7 Pek. Plesteran + Acian 1 : 5 m2 78.00 72,908.00 5,686,824.00
8 Pek. Balok/Ringbalk beton bertulang 15/20 m3 0.78 7,024,372.00 5,479,010.16
9 Pek. Pagar Besi Hollow m' 24.00 550,000.00 13,200,000.00
10 Pek. Pintu Pagar Besi Hollow bh 1.00 4,500,000.00 4,500,000.00
JUMLAH HARGA
NO URAIAN PEKERJAAN PEKERJAAN
( Rp )
(a) (b) (c)
TOTAL #NAME?
PPN 10 % #NAME?
JUMLAH TOTAL #NAME?
DIBULATKAN #NAME?
Terbilang :
#NAME?
PEKERJAAN :
SATKER : DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016
SAT
NO. URAIAN PEKERJAAN
a b c
A PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama proyek ls 1.00 x 1.00 x 1.00 = 1.00
B HANGGAR A
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' 212.00 x 1.00 x 1.00 = 212.00
II PEKERJAAN TANAH
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 220.00 x 0.40 x 0.60 = 52.80
1 Pek. Galian Tanah untuk pondasi maks. 2 m m3 54.00 x 1.44 x 2.20 = 171.07
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 223.87 x 0.35 x 1.00 = 78.36
3 Pek. Urugan Tanah dibawah lantai dipadatkan m3 44.00 x 66.00 x 0.20 = 580.80
4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 44.00 x 66.00 x 0.05 = 145.20
a b c
IV PEKERJAAN BAJA
1 Pas. Kolom IWF. 300.150.6.5.9 kg 30.00 x 3.00 x 36.70 = 3,303.00
16.00 x 6.00 x 36.70 = 3,523.20
8.00 x 4.60 x 36.70 = 1,350.56
8,176.76
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 3x m2 x x = -
VI PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk 12.00 x 8.00 x 1.00 = 96.00
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk 48.00 x 1.00 x 1.00 = 48.00
a b c
VII PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek m2 24.20 x 44.00 x 1.00 = 1,064.80
25.00 x 66.00 x 1.00 = 1,650.00
12.50 x 40.00 x 1.00 = 500.00
3,214.80
C HANGGAR B
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' x x = -
Sub Jumlah x x = -
II PEKERJAAN TANAH x x = -
1 Pek. Galian Tanah untuk pondasi maks. 2 m m3 x x = -
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x x = -
Sub Jumlah x x = -
III PEKERJAAN TEMBOKAN x x = -
1 Pek. Pondasi Foot Plat m3 x x = -
2 Pek. Sloof Beton 15/20 m3 x x = -
3 Pas. Kolom 25/30 m3 x x = -
4 Pek. Plesteran + Acian 1 : 5 m2 x x = -
5 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x x = -
6 Pas. Batu Tempel m2 x x = -
Sub Jumlah x x = -
IV PEKERJAAN BAJA x x = -
1 Pas. Kolom IWF. 200.100.5.5.8 kg x x = -
2 Pas. Balok IWF. 200.100.5,5.8 kg x x = -
3 Pas. Balok IWF. 150.75.5.7 kg x x = -
4 Pas. Besi C 125.50.20.2,3 kg x x = -
5 Pek. Plat Stepner kg x x = -
6 Pas. Track Stang kg x x = -
7 Pas. Silang Angin kg x x = -
8 Pek. Erikson Baja kg x x = -
9 Pas. Base Plat kg x x = -
10 Pas. Baut HTB Dia. 19" kg x x = -
x x = -
V PEKERJAAN PENGECATAN x x = -
1 Pek. Pengecatan Dinding 3x m2 x x = -
Sub Jumlah x x = -
VI PEKERJAAN LISTRIK x x = -
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk x x = -
3 Pas. Lampu TL 36 watt + aksesoris Philips & Penggantung bh x x = -
4 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh x x = -
5 Pas. Saklar Ganda , sek. Broco bh x x = -
Sub Jumlah x x = -
VII PEKERJAAN PENUTUP ATAP x x = -
1 Pas. Atap Spandek m2 x x = -
2 Pas. Listplank m' x x = -
3 Pas. Talang Datar m' x x = -
4 Pas. Pipa Tegak 3' m' x x = -
Sub Jumlah x x = -
D HANGGAR C x x = -
I PEKERJAAN PERSIAPAN x x = -
1 Pek. Pengukuran Dan Bouwplank m' x x = -
Sub Jumlah x x = -
II PEKERJAAN TANAH x x = -
1 Pek. Galian Tanah untuk pondasi maks. 2 m m3 x x = -
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x x = -
3 Pek. Urugan Tanah dibawah lantai dipadatkan m3 x x = -
4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x x = -
Sub Jumlah x x = -
SAT
NO. URAIAN PEKERJAAN
a b c
III PEKERJAAN TEMBOKAN x x = -
1 Pek. Pondasi Foot Plat m3 x x = -
2 Pek. Sloof Beton 15/20 m3 x x = -
3 Pas. Kolom 25/30 m3 x x = -
4 Pek. Plesteran + Acian 1 : 5 m2 x x = -
5 Pek. Lantai Kerja Beton Beton Tumbuk m3 x x = -
6 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x x = -
Sub Jumlah x x = -
IV PEKERJAAN BAJA x x = -
1 Pas. Kolom IWF. 200.100.5.5.8 kg x x = -
2 Pas. Balok IWF. 200.100.5,5.8 kg x x = -
3 Pas. Balok IWF. 150.75.5.7 kg x x = -
4 Pas. Besi C 125.50.20.2,3 kg x x = -
5 Pek. Plat Stepner kg x x = -
6 Pas. Track Stang kg x x = -
7 Pas. Silang Angin kg x x = -
8 Pek. Erikson Baja kg x x = -
9 Pas. Base Plat kg x x = -
10 Pas. Baut HTB Dia. 19" kg x x = -
x x = -
V PEKERJAAN PENGECATAN x x = -
1 Pek. Pengecatan Dinding 3x m2 x x = -
Sub Jumlah x x = -
VI PEKERJAAN LISTRIK x x = -
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk x x = -
3 Pas. Lampu TL 36 watt + aksesoris Philips & Penggantung bh x x = -
4 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh x x = -
5 Pas. Saklar Ganda , sek. Broco bh x x = -
Sub Jumlah x x = -
VII PEKERJAAN PENUTUP ATAP x x = -
1 Pas. Atap Spandek m2 x x = -
2 Pas. Listplank m' x x = -
3 Pas. Talang Datar m' x x = -
4 Pas. Pipa Tegak 3 " m' x x = -
Sub Jumlah x x = -
E HANGGAR D x x = -
I PEKERJAAN PERSIAPAN x x = -
1 Pek. Pengukuran Dan Bouwplank m' x x = -
Sub Jumlah x x = -
II PEKERJAAN TANAH x x = -
1 Pek. Galian Tanah untuk pondasi maks. 2 m m3 x x = -
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x x = -
3 Pek. Urugan Tanah dibawah lantai dipadatkan m3 x x = -
4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x x = -
Sub Jumlah x x = -
III PEKERJAAN TEMBOKAN x x = -
1 Pek. Pondasi Foot Plat m3 x x = -
2 Pek. Sloof Beton 15/20 m3 x x = -
3 Pas. Kolom 25/30 m3 x x = -
4 Pek. Plesteran + Acian 1 : 5 m2 x x = -
5 Pek. Lantai Kerja Beton Beton Tumbuk m3 x x = -
6 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x x = -
Sub Jumlah x x = -
SAT
NO. URAIAN PEKERJAAN
a b c
IV PEKERJAAN BAJA x x = -
1 Pas. Kolom IWF. 200.100.5.5.8 kg x x = -
2 Pas. Balok IWF. 175.90.5.8 kg x x = -
3 Pas. Balok IWF. 150.75.5.7 kg x x = -
4 Pas. Besi C 125.50.20.2,3 kg x x = -
5 Pek. Plat Stepner kg x x = -
6 Pas. Track Stang kg x x = -
7 Pas. Silang Angin kg x x = -
8 Pek. Erikson Baja kg x x = -
9 Pas. Base Plat kg x x = -
10 Pas. Baut HTB Dia. 19" kg x x = -
x x = -
V PEKERJAAN PENGECATAN x x = -
1 Pek. Pengecatan Dinding 3x m2 x x = -
Sub Jumlah x x = -
VI PEKERJAAN LISTRIK x x = -
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -
2 Pek. Instlalasi Stop Kontak (bahan+upah) ttk x x = -
3 Pas. Lampu TL 36 watt + aksesoris Philips & Penggantung bh x x = -
4 Pas. Stop Kontak 1 phasa 16 a , sek. Broco bh x x = -
5 Pas. Saklar Ganda , sek. Broco bh x x = -
Sub Jumlah x x = -
VII PEKERJAAN PENUTUP ATAP x x = -
1 Pas. Atap Spandek m2 x x = -
2 Pas. Bubungan m2 x x = -
Sub Jumlah x x = -
F HANGGAR E x x = -
I PEKERJAAN PERSIAPAN x x = -
1 Pek. Pengukuran Dan Bouwplank m' x x = -
2 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x x = -
Sub Jumlah x x = -
II PEKERJAAN TEMBOKAN x x = -
1 Pek. Sloof Beton 15/20 m3 x = -
2 Pas. Kolom Praktis m3 x = -
3 Pas. Ringbalok m3 x = -
4 Pas. Bata Merah m2 x = -
5 Pek. Plesteran + Acian 1 : 5 m2 x = -
6 Pek. Plat Decker m3 x = -
7 Pas. Lantai Keramik uk 40 x 40 cm DN m3 x = -
Sub Jumlah x = -
III PEKERJAAN PENGECATAN x = -
1 Pek. Pengecatan Dinding 3x m2 x =
Sub Jumlah x =
G PEKERJAAN BANGUNAN PENUNJANG x =
I PEKERJAAN GAZEBO x =
1 Pek. Pengukuran Dan Bouwplank m' x =
2 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x =
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x =
4 Pek. Urugan Tanah dibawah lantai dipadatkan m3 x =
5 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x =
6 Pas. Aanstamping m3 x =
7 Pek. Pondasi Batu Belah ad 1:5 m3 x =
8 Pek. Sloof Beton 15/20 m3 x =
9 Pas. Kolom Praktis m3 x =
10 Pas. Ringbalok m3 x =
11 Pas. Bata Merah m2 x =
12 Pek. Plesteran + Acian 1 : 5 m2 x =
13 Pek. Lantai Rabat Beton ad 1:3:5 + acian m3 x =
SAT
NO. URAIAN PEKERJAAN
a b c
14 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x =
15 Pas. Rangka Plafond Besi Hollow m2 x =
16 Pas. Penutup Plapond GRC m2 x =
17 Pek. Pengecatan Dinding 3x m2 x =
18 Pek. Pengecatan Plafond 3x m2 x =
19 Pas. Rangka Atap Baja Ringan m2 x =
20 Pas. Penutup Atap Genteng Metal m2 x =
21 Pas. Bubungan m' x
Sub Jumlah x
II PEKERJAAN PERGOLA 2 UNIT x
1 Pek. Pengukuran Dan Bouwplank m' x
2 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x
4 Pek. Urugan Tanah dibawah lantai dipadatkan m3 x
5 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x
6 Pas. Aanstamping m3 x
7 Pek. Pondasi Batu Belah ad 1:5 m3 x
8 Pek. Sloof Beton 15/20 m3 x
9 Pas. Kolom Praktis m3 x
10 Pas. Bata Merah m2 x
11 Pek. Plesteran + Acian 1 : 5 m2 x
12 Pek. Lantai Rabat Beton ad 1:3:5 + acian m3 x
13 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x
14 Pek. Pengecatan Dinding 3x m2 x
15 Pek. Pengecatan Besi 3x m2 x
16 Pas. Rangka Atap Besi Pipa x
- Pipa BSP 3" m' x
- Pipa BSP 2" m' x
- Pas. Wiremesh M8 m2 x
Sub Jumlah x
III PEKERJAAN TANGGA x
1 Pek. Pengukuran Dan Bouwplank m' x
2 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x
4 Pek. Pondasi Batu Belah ad 1:5 m3 x
5 Pek. Plesteran Siar m2 x
6 Pas. Lantai Keramik uk 40 x 40 cm DN m2 x
Sub Jumlah x
IV PEKERJAAN PAGAR x
1 Pek. Pengukuran Dan Bouwplank m' x
2 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x
3 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 x
4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 x
5 Pek. Pondasi Beton Tumbuk ad 1:5 m3 x
6 Pas. Kolom 20/20 m3 x
7 Pek. Plester Acian Kolom m2 x
8 Pas. Pagar Besi Hollow Finish Cat m'
Sub Jumlah
V PEKERJAAN LAPANGAN PARKIR, PEDESTRIAN DAN SALURAN AIR HUJAN
1 Pek. Striping Tanah m2
2 Pas. Paving Block m3
3 Pas. Saluran Air Hujan Gravel 1/2 dia. 20 cm m'
Sub Jumlah
HITUNGAN VOLUME
UKURAN
PANJANG 36.00
LEBAR 17.00
AANSTAMPING x x = -
PONDASI
LANTAI 2
35 X 35 - x 0.12 x 3.50 = -
PEK. BAJA
BoQ - Pembangunan Gedung Kwarcab Pramuka Cianjur Hit Volum - hal 77 dari 98
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN KANTOR DINAS KEPENDUDUKAN DAN CATATAN SIPIL
KABUPATEN CIANJUR
SATKER : DINAS KEPENDUDUKAN DAN CATATAN SIPIL
LOKASI : KECAMATAN CIANJUR
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2015
A PEKERJAAN PERSIAPAN
1 Pengukuran & Pasang Bouwplank 114.00 ls #NAME? #NAME?
2 Pembuatan Dreksikeet 1.00 ls 5,000,000.00 5,000,000.00
3 Mobilisasi Alat Dan Bahan 1.00 ls 15,000,000.00 15,000,000.00
4 Administrasi, Perijinan Dan Dokumentasi 1.00 ls 5,000,000.00 5,000,000.00
5 Pengadaan Listrik Kerja 1.00 ls 2,000,000.00 2,000,000.00
6 Pengadaan Air Kerja 1.00 ls 2,000,000.00 2,000,000.00
7 Pas. Pagar Pengaman Proyek 63.00 m' #NAME? #NAME?
8 Pembersihan Area Bekas Pekerjaan 1.00 ls 2,000,000.00 2,000,000.00
Sub Jumlah #NAME?
B LANTAI BASEMENT
I PEKERJAAN TANAH
1 Pek. Urugan Tanah 2,400.00 m3 145,000.00 348,000,000.00
2 Pek. Galian Tanah 186.00 m3 69,300.00 12,889,800.00
3 Pek. Urugan Tanah Kembali 65.10 m3 41,250.00 2,685,375.00
4 Pek. Urugan Tanah Peninggian Lantai ( Tinggi 20 cm ) 124.10 m3 41,250.00 5,119,125.00
5 Pek. Urugan Pasir Bawah Pondasi Batu Kali 31.03 m3 #NAME? #NAME?
-
Sub Jumlah #NAME?
II PEKERJAAN BETON DAN TEMBOKAN
1 Aanstamping Batu Kali ( 1: 5 ) 2.40 m3 #NAME? #NAME?
2 Pondasi Batu Kali ( 1 : 5 ) 14.30 m3 #NAME? #NAME?
3 Pondasi Setempat uk. 150 x 150 cm 25.50 m3 #NAME? #NAME?
4 Kolom Pedestal uk. 50/50 17.39 m3 #REF! #REF!
5 Sloof BS1 ( 20/40 ) 33.60 m3 #NAME? #NAME?
6 Kolom uk. 50/50 #REF! m3 #REF!
7 Kolom uk. 30/30 0.64 m3 #NAME?
8 Dinding Beton t = 15 cm 31.80 m3 -
9 Lantai Beton t = 12 cm 73.44 m3 #NAME? #NAME?
10 Lantai Basement Beton t = 20 cm 122.40 m3 -
11 Pas.Dinding 1/2 Bata ( 1 : 5 ) 212.00 m2 #NAME?
12 Plesteran dan aci ( 1 : 5 ) 424.00 m2 #NAME?
13 Acian Kolom Exposed 126.00 m2 30,410.00
14 Kolom Praktis uk. 12/12 cm 0.32 m3 #NAME?
15 Pas. Lantai Keramik uk. 20 x 20 cm 4.50 m2 #NAME?
16 Pas. Dinding Keramik uk. 20 x 25 cm 15.60 m2 214,036.00
17 Pek. Floor Hardner 578.00 m2 55,000.00
18 Pas. Grevel Saluran U 20 cm 70.00 m' #REF! #REF!
19 Pas. Bak Kontrol Pasangan Bata 30 x 30 cm 4.00 bh #NAME? #NAME?
20 Pas. Saluran L = 40 cm + Plat Decker 12.00 m' 1,006,266.00 12,075,192.00
Hal 78
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
7 Pas. Panel (Panel SDF, Panel AC, Panel Fire Alrm) 1.00 unit 35,000,000.00 35,000,000.00
8 #REF! 1.00 ls #REF! #REF!
9 #REF! 1.00 ls #REF! #REF!
10 BP Listrik 1.00 ls 25,000,000.00 25,000,000.00
IV PEKERJAAN SANITARY -
1 Pas. Closet Jongkok 2.00 bh #REF!
2 Pas. Floor Drain Stainles 2.00 bh #REF!
3 Pas. Wastafel 1.00 bh 950,000.00
4 Pas. Bak Mandi Fiber uk. 60 x 60 motif 2.00 bh #REF!
5 Pas. Kran Air dia. 1/2" 2.00 bh #REF!
6 Pas. Instalasi Air Kotor Pipa PVC dia 4" 8.00 m1 #REF!
7 Pas. Instalasi Air Bersih Pipa PVC dia 1/2" 24.00 m1 #REF!
8 Pas. Ground Tank 1.00 unit 30,000,000.00
9 Pas. Pompa Air 2.00 unit 2,500,000.00
10 Pas. Sumur Bor 1.00 unit 7,000,000.00
11 Pas. Septicktank 1,5 x 1 x 1,5 m + Rembesan 2.00 unit 7,500,000.00
-
Sub Jumlah -
C LANTAI 1
I PEKERJAAN BETON DAN TEMBOKAN
1 Balok 25/50 35.63 m3 - -
2 Balok 15/30 3.83 m3 - -
3 Kolom uk. 50/50 32.00 m3 - -
4 Kolom uk. 30/30 0.64 m3 #NAME? #NAME?
5 Lantai Beton t = 12 cm 73.44 m3 #NAME? #NAME?
6 Pas.Dinding 1/2 Bata ( 1 : 5 ) 414.40 m2 #NAME? #NAME?
7 Plesteran dan aci ( 1 : 5 ) 828.80 m2 #NAME? #NAME?
8 Acian Kolom Exposed 196.00 m2 30,410.00 5,960,360.00
9 Kolom Praktis uk. 12/12 cm 1.97 m3 #NAME? #NAME?
10 Topi Beton t = 7 cm 1.32 m3 #NAME? #NAME?
11 Balok Lintel 1.91 m3 - -
12 Meja Beton Los 0.13 m3 #NAME? #NAME?
12 Lantai Keramik uk. 30 x 30 cm 598.55 m2 #NAME? #NAME?
13 Pas. Lantai Keramik uk. 20 x 20 cm 20.25 m2 #NAME? #NAME?
14 Pas. Dinding Keramik uk. 20 x 25 cm 63.60 m2 #REF! #REF!
15 Lantai Kerja tebal = 5 cm 30.94 m3 #NAME? #NAME?
II PEK. PENGECATAN
1 Pengecatan Dinding 1,024.80 m2 #NAME? #NAME?
2 Pengecatan Plafond 612.00 m2 #NAME? #NAME?
Hal 79
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
V PEK. ELEKTRIKAL
1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 47.00 Titik 165,000.00 7,755,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 16.00 Titik 165,000.00 2,640,000.00
3 Pas. Lampu RM 2x 20 watt 18.00 bh 350,000.00 6,300,000.00
4 Pas. Lampu Down Light 29.00 bh 175,000.00 5,075,000.00
5 Saklar Tunggal 11.00 bh 50,600.00 556,600.00
6 Saklar Ganda 18.00 bh 50,600.00 910,800.00
7 Stop Kontak 16.00 bh 50,600.00 809,600.00
8 Pas. AC 11.00 unit 6,500,000.00 71,500,000.00
VI PEKERJAAN SANITARY -
1 Pas. Closet Jongkok 3.00 bh #REF! #REF!
2 Pas. Closet Duduk 4.00 bh 2,500,000.00 10,000,000.00
3 Pas. Floor Drain Stainles 7.00 bh #REF! #REF!
4 Pas. Wastafel 3.00 bh 950,000.00 2,850,000.00
5 Pas. Bak Mandi Fiber uk. 60 x 60 motif 7.00 bh #REF! #REF!
6 Pas. Kran Air dia. 1/2" 12.00 bh #REF! #REF!
7 Pas. Kitchenzink 1.00 bh #REF! #REF!
8 Pas. Instalasi Air Kotor Pipa PVC dia 4" 56.00 m1 #REF! #REF!
9 Pas. Instalasi Air Bersih Pipa PVC dia 1/2" 84.00 m1 #REF! #REF!
II PEK. PENGECATAN
1 Pengecatan Dinding 1,024.80 m2 #NAME? #NAME?
2 Pengecatan Plafond 612.00 m2 #NAME? #NAME?
3 Pengecatan Kayu 31.80 m2 #NAME? #NAME?
Hal 80
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
1 Pas. Kusen Pintu Alumunium P2 Warna 4" 3.00 Unit 4,200,000.00 12,600,000.00
2 Pas. Kusen Pintu Alumunium P3 Warna 4" 9.00 Unit 2,650,000.00 23,850,000.00
3 Pas. Kusen Pintu Alumunium P4 Warna 4" 5.00 Unit 1,800,000.00 9,000,000.00
4 Pas. Kusen Jendela Alumunium J2 Warna 4" 20.00 Unit 2,950,000.00 59,000,000.00
5 Pas. Kusen Bouvenlight Alumunium BV2 Warna 4" 5.00 Unit 950,000.00 4,750,000.00
6 Pas. Railling Tangga 7.60 m' 550,000.00 4,180,000.00
IV PEK. ATAP
1 Pas. Kuda kuda Baja Ringan 656.03 m2 175,000.00 114,805,250.00
2 Pas. Penutup Atap Genteng Morando 656.03 m2 - -
3 Pas. Bubungan 62.00 m2 - -
4 Pas. Listplank 106.00 m' #REF! #REF!
VI PEK. ELEKTRIKAL
1 Instalasi Titik Lampu ( Kabel ( NYM 3 x 2.5 mm ) 47.00 Titik 165,000.00 7,755,000.00
2 Instalasi Titik Stop Kontak ( Kabel ( NYM 3 x 2.5 mm ) 16.00 Titik 165,000.00 2,640,000.00
3 Pas. Lampu RM 2x 20 watt 18.00 bh 350,000.00 6,300,000.00
4 Pas. Lampu Down Light 29.00 bh 175,000.00 5,075,000.00
5 Saklar Tunggal 11.00 bh 50,600.00 556,600.00
6 Saklar Ganda 18.00 bh 50,600.00 910,800.00
7 Stop Kontak 16.00 bh 50,600.00 809,600.00
8 Pas. AC 16.00 unit 6,500,000.00 104,000,000.00
9 Penangkal Petir 1.00 unit #REF! #REF!
Hal 81
VOLUME HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 3 4 5
Hal 82
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN KANTOR DINAS KEPENDUDUKAN DAN CATATAN SIPIL
KABUPATEN CIANJUR
SATKER : DINAS TATA RUANG DAN PERMUKIMAN
LOKASI : KECAMATAN CIANJUR
KABUPATEN : CIANJUR
TAHUN ANGGARAN : 2016
JUMLAH HARGA
NO URAIAN PEKERJAAN PEKERJAAN
( Rp )
(a) (b)
#REF! #REF!
II PEKERJAAN BETON DAN TEMBOKAN #NAME?
III PEK. PENGECATAN #NAME?
IV PEK. ALUMUNIUM 157,430,000.00
V PEK. PARTISI DAN PLAFOND #REF!
VI PEK. ELEKTRIKAL #REF!
VII PEKERJAAN SANITARY #REF!
D LANTAI 2
I PEKERJAAN BETON DAN TEMBOKAN #NAME?
II PEK. PENGECATAN #NAME?
III PEK. BESI DAN ALUMUNIUM 113,380,000.00
IV PEK. ATAP #REF!
V PEK. KAYU DAN PLAFOND #VALUE!
VI PEK. ELEKTRIKAL #REF!
VII PEKERJAAN SANITARY #REF!
TOTAL #NAME?
PPN 10 % #NAME?
JUMLAH TOTAL #NAME?
DIBULATKAN #NAME?
Terbilang : ###
#NAME?
###
###
###
SAT
NO. URAIAN PEKERJAAN
a b c
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' 76.00 x 1.00 x 1.00 = 76.00
2 Pembuatan Papan Nama proyek ls 1.00 x 1.00 x 1.00 = 1.00
3 Sewa Direksikeet ls 1.00 x 1.00 x 1.00 = 1.00
4 Administrasi, Perijinan dan Dokumentasi ls 1.00 x 1.00 x 1.00 = 1.00
5 Bongkaran ls 1.00 x 1.00 x 1.00 = 1.00
6 Pengupasam Lahan ls 25.00 x 18.00 x 1.00 = 450.00
Sub Jumlah x x = -
B PEKERJAAN LANTAI I x x = -
I PEKERJAAN TANAH x x = -
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 65.00 x 1.00 x 1.00 = 65.00
Pek. Galian Tanah untuk pondasi footplat maks. 2 m m3 38.00 1.44 2.00 109.44
2 Pek. Urugan Tanah Kembali Bekas Galian Pondasi m3 174.44 x 0.35 x 1.00 = 61.05
3 Pek. Urugan Tanah dibawah lantai dipadatkan m3 15.00 x 23.00 x 0.20 = 69.00
4 Pek. Urugan Pasir dibawah pasangan (5 cm) m3 15.00 x 23.00 x 0.05 = 17.25
Sub Jumlah x x = -
II PEKERJAAN TEMBOKAN x x = -
1 Pas. Aanstamping m3 65.00 x 0.15 x 1.00 = 9.75
a b c
a b c
3 Pek. List Plafond Kayu m1 81.00 x 1.00 x 1.00 = 81.00
14 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris unit x x = -
SAT
NO. URAIAN PEKERJAAN
a b c
14 Pek. Septiktank uk. 2 x 1.5 x 1.5 m unit x x = -
- bangunan septiktank
- valve, fitting & aksesoris
- pemipaan septiktank & bidang resapan
- galian & urugan
- bak kontrol
- testing & commisionning
6 Pas. Lampu SL bh x x = -
2 Pas. Pipa PVC AW dia. 3" sek. Maspion + Pipa tegak m' x x = -
a b c
PG 1 2.60 x 2.30 x - = -
P1 2.60 x 1.50 x 2.00 = 7.80
P2 2.60 x 0.90 x 7.00 = 16.38
P3 2.60 x 0.80 x 3.00 = 6.24
P4 2.10 x 0.80 x - = -
J1 2.40 x 0.70 x 1.00 = 1.68
J2 1.55 x 1.35 x 12.00 = 25.11
J3 1.55 x 2.00 x = -
BV 1 0.50 x 0.70 x = -
BV 2 0.50 x 1.15 x 6.00 = 3.45
BV 3 0.50 x 2.00 x = -
60.66
Sub Jumlah
II PEKERJAAN PLAFOND
Pas. Dinding Partisi Gypsum m2 45.00 x 3.20 x 1.00 = 144.00
P1 2.60 1.50 2.00 7.80
P2 2.60 0.90 5.00 11.70
124.50
a b c
6.50 x 7.65 x 2.00 = 99.45
6.50 x 7.65 x 2.00 = 99.45
359.55
12 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris bh x x = -
Sub Jumlah
VII PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -
3 Pas. Lampu SL bh x x = -
a b c
2 Pas. Pipa PVC AW dia. 3" sek. Maspion + Pipa tegak m' x x = -
Sub Jumlah
D PEKERJAAN LAIN LAIN
1 Pek. Plank Nama bahan Stainless uk. 75 cm x 25 cm bh x x = -
" PUSKESMAS CIKONDANG "
Kecamatan Haurwangi - Kabupaten Cianjur
3 Pas. Saluaran Air Hujan Pasangan Gravel 1/2 Dia. 20 cm m' x x = -
SAT
NO. URAIAN PEKERJAAN
a b c
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Dan Bouwplank m' x 1.00 x 1.00 = -
2 Pembuatan Papan Nama proyek ls x 1.00 x 1.00 = -
3 Sewa Direksikeet ls x 1.00 x 1.00 = -
4 Administrasi, Perijinan dan Dokumentasi ls x 1.00 x 1.00 = -
5 Bongkaran ls x 1.00 x 1.00 = -
Sub Jumlah x x = -
B PEKERJAAN LANTAI I x x = -
I PEKERJAAN TANAH x x = -
1 Pek. Galian Tanah untuk pondasi maks. 1 m m3 x 1.00 x 1.00 = -
a b c
9 Pek. Plat Lantai Beton T = 12 m3 x 0.12 x 1.00 = -
VOID x 0.12 x 1.00 = -
x 0.12 x 1.00 = -
-
a b c
Sub Jumlah x x = -
III PEKERJAAN PLAFOND x x = -
1 Pas. Dinding Partisi Gypsum m2 x x = -
a b c
x 8.00 x 6.00 = -
x 8.00 x 2.00 = -
x 8.00 x 6.00 = -
x 8.00 x 6.00 = -
-
Sub Jumlah x x = -
VI PEKERJAAN PENGECATAN x x = -
1 Pek. Pengecatan Dinding 3x m2 - x 1.00 x 1.00 = -
14 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris unit x 1.00 x 1.00 = -
a b c
2 Pas. Pipa PVC AW dia. 3/4" sek. Maspion m' x 1.00 x 1.00 = -
3 Pas. Pipa PVC AW dia. 1/2" sek. Maspion m' x 1.00 x 1.00 = -
2 Pas. Pipa PVC AW dia. 3" sek. Maspion + Pipa tegak m' x 1.00 x 1.00 = -
3 Pas. Pipa PVC AW dia. 2" sek. Maspion m' x 1.00 x 1.00 = -
Sub Jumlah
C PEKERJAAN LANTAI II
I PEKERJAAN TEMBOKAN
1 Pek. Kolom Praktis 12/12 m3 x 0.01 x 3.50 = -
PG 1 x 2.30 x - = -
P1 x 1.50 x - = -
P2 x 0.90 x 9.00 = -
P3 x 0.80 x = -
SAT
NO. URAIAN PEKERJAAN
a b c
P4 x 0.80 x - = -
J1 x 0.70 x = -
J2 x 1.35 x 4.00 = -
J3 x 2.00 x = -
BV 1 x 0.70 x = -
BV 2 x 1.15 x = -
BV 3 x 2.00 x 32.00 = -
-
Sub Jumlah
II PEKERJAAN PLAFOND
Pas. Dinding Partisi Gypsum m2 x 3.50 x 1.00 = -
P1 1.50 3.00 -
P2 0.90 3.00 -
a b c
3 Pek. Pengecatan Listplank GRC m2 x 1.00 x 1.00 = -
Sub Jumlah
VI PEKERJAAN SANITARY
1 Pas. Closet Duduk unit x 1.00 x 1.00 = -
12 Pas. Water torn fiber sek, Pinguin kav. 1000 ltr lengkap aksesoris bh x x = -
Sub Jumlah
VII PEKERJAAN LISTRIK
1 Pek. Instlalasi Penerangan (bahan+upah) ttk x x = -
3 Pas. Lampu SL bh x x = -
2 Pas. Pipa PVC AW dia. 3" sek. Maspion + Pipa tegak m' x x = -
Sub Jumlah
D PEKERJAAN LAIN LAIN
1 Pek. Plank Nama bahan Stainless uk. 75 cm x 25 cm bh x x = -
" PUSKESMAS CIKONDANG "
Kecamatan Haurwangi - Kabupaten Cianjur
3 Pas. Saluaran Air Hujan Pasangan Gravel 1/2 Dia. 20 cm m' x x = -
SAT
NO. URAIAN PEKERJAAN
a b c
2 Pek. Tangga Pipa Besi bh x x = -