HARGA
NO JENIS UPAH SATUAN
Rp.
1 Kepala Tukang 90,000.00 org-hari
2 Tukang Batu 80,000.00 org-hari
3 Tukang Kayu 80,000.00 org-hari
4 Tukang Besi / Tukang Pipa 80,000.00 org-hari
5 Tukang Cat 80,000.00 org-hari
6 Tukang Las 80,000.00 org-hari
7 Tukang Listrik 80,000.00 org-hari
8 Mandor 100,000.00 org-hari
9 Pekerja 72,000.00 org-hari
HARGA
NO JENIS BAHAN SATUAN
Rp.
A. Bahan Agregat Kasar, Bahan Pelekat dan Bahan Jadi
1 Pasir Urug 100,000.00 M3
2 Pasir Pasang 100,000.00 M3
3 Pasir Beton 100,000.00 M3
4 Batu Kerikil Beton 333,333.33 M3
5 Batu Kali / Belah Belah 133,333.33 M3
6 Batu Karang Mati 150,000.00 M3
7 Batu Kerikil / Split 2/3 cm 360,000.00 M3
8 Bata Merah Bakar Kelas I 840.00 Bh
9 Cincin Beton dia 1 m 275,000.00 Bh
10 Cincin Beton dia 1,5 m 380,000.00 Bh
11 Batako 3,500.00 Bh
12 Semen Bosowa (40 kg) 57,000.00 Zak
13 Semen Tonasa (40 kg) 52,000.00 Zak
14 Block Glas 34,000.00 Bh
15 Semen Warna 11,337.00 Kg
16 Tanah urug 85,000.00 M3
17 Batu Tempel 300,000.00 M2
18 Sirtu urug 100,000.00 M2
B. Bahan Finishing Laburan Pengisi dan Alatnya
1 Plamir Tembok 12,500.00 Kg
2 Plamir Kayu 50,000.00 Kg
3 Cat Tembok 16,000.00 Kg
4 Cat Tembok No Drop 64,060.80 Kg
5 Kuas Roll 50,000.00 Bh
6 Kuas Kayu Besar 25,000.00 Bh
7 Minyak cat / Thinner 45,000.00 Ltr
8 Amplas 7,500.00 Lbr
9 Meni Kayu 45,000.00 Kg
10 Meni Besi 40,000.00 Kg
11 Cat Kayu 70,000.00 Kg
12 Cat Besi 70,000.00 Kg
13 Residu 5,500.00 Ltr
14 Lem Kayu 28,000.00 Kg
15 Politur 65,000.00 Kg
16 Cat Minyak 68,000.00 Kg
17 Minyak Bekisting 31,500.00 Kg
C. Bahan Kayu/Baja Berikut Bahan Jadinya
HARGA
NO JENIS BAHAN SATUAN
Rp.
1 Kayu Kelas III Papan (Begisting) 1,365,000.00 M3
2 Kayu Kelas III Balok 2,100,000.00 M3
3 Kayu Kelas II Papan 2,300,000.00 M3
4 Kayu Kelas II Balok 2,024,820.00 M3
5 Kayu Kelas I Papan 3,500,000.00 M3
6 Kayu Kelas I Balok 4,000,000.00 M3
7 Kayu Dolken 5,000.00 Btg
8 List Plafond Profil 3 Cm 35,000.00 Btg
9 Listplang Calsiplang 25 cm 46,000.00 Lmbr
10 Listplang Calsiplang 30 cm 90,000.00 Lmbr
11 Skruf 500.00 Bh
12 Baja Ringan 96,000.00 Btg
13 Reng 44,000.00 Btg
D. Bahan Penutup Rangka Plafond
1 Triplek 4mm 120 x 240 68,000.00 Lbr
2 Triplek 6mm 120 x 240 76,000.00 Lbr
3 Papan Gipsum 68,000.00 Lbr
4 Polywood tebal 9 mm 92,000.00 Lbr
E. Bahan Kayu Lapis
1 Multipleks 12mm 120 x 240 185,000.00 Lbr
2 Multipleks 18mm 120 x 240 210,000.00 Lbr
3 Multipleks 18mm 120 x 240 210,000.00 Lbr
4 MDF 1,5 cm 275,000.00
5 Jabarwood 4 mm 92,000.00 Lbr
F. Bahan Lantai dan Pelapis Dinding
1 Keramik 30 x 30 cm 70,000.00 Doz
2 Keramik 40 x 40 cm 80,000.00 Doz
3 Keramik 40 x 40 cm Anti slip 65,000.00 Doz
3 Keramik 20 x 25 cm 88,000.00 Doz
4 Keramik 10 x 20 cm 69,000.00 Doz
5 Keramik 20 x 20 cm 69,000.00 Doz
6 Keramik 15 x 20 cm 69,000.00 Doz
7 Keramik Porselen 11 x 11 cm 63,000.00 Doz
8 Keramik Porselen 11 x 11 cm, Warna 74,000.00 Doz
9 Keramik Porselen 10 x 20 cm, Warna 65,000.00 Doz
10 Keramik Porselen 20 x 20 cm, Warna 65,000.00 Doz
11 Keramik 30 x 30 cm Anti Slip 80,000.00 Doz
G. Bahan Saluran Air Kotor (Riolering)
1 Buis belah dia 20 cm Bh
H. Bahan Logam dan Bahan Jadinya
1 Besi Beton Polos Dia. 12 mm 145,000.00 Staf
2 Besi Beton Polos Dia. 10 mm 95,000.00 Staf
3 Besi Beton Polos Dia. 8 mm 72,000.00 Staf
4 Besi Beton Polos Dia. 6 mm 45,000.00 Staf
5 Besi Siku 50.50.5 panjang 6 m 18,176.89 Btg
6 Besi Strip 2x3 35,000.00 M²
7 Besi Strip 46,000.00 Kg
8 Kawat Beton 37,000.00 Kg
9 Beghel U (Plat Baja U 4.40mm) 35,000.00 bh
10 Beghel U (Besi Polos 12mm) 47,000.00 bh
11 Plat Baja 4.40mm 25,000.00 bh
12 Baut Dia. 10mm (25 - 30 cm) 5,000.00 bh
13 Kawat berduri 80,000.00 Roll
14 Pagar BRC Ø6 mm, lengkap dengan tiang dan klem pengikat 360,000.00 lbr
15 Almunium 125,000.00 M²
I. Bahan Kaca
1 Kaca Polos 5 mm 325,000.00 M²
2 Kaca Polos 3 mm 140,000.00 M²
HARGA
NO JENIS BAHAN SATUAN
Rp.
J. Bahan Paku
1 Paku Biasa 20,000.00 Kg
2 Paku Tripleks 35,000.00 Kg
3 Paku Seng 50,000.00 Kg
4 Karet Kepala Paku 3,500.00 Lmbr
5 Paku Ulir 33,000.00 Kg
K. Bahan Perpipaan (Riolering dan Asineering)
1 Pipa PVC AW 0,5" 47,000.00 btg
2 Knee 0,5" 6,500.00 Bh
3 Shook 0,5" 5,000.00 Bh
4 Tee 0,5" 6,500.00 Bh
5 Over Shook 0,5"-0,75" 7,000.00 Bh
6 Watermur 0,5" 12,000.00 Bh
7 Kran Air 0,5" 35,000.00 Bh
8 Pipa PVC AW 0,75" 59,000.00 btg
9 Knee 0,75" 8,000.00 Bh
10 Shook 0,75" 5,500.00 Bh
11 Tee 0,75" 8,000.00 Bh
12 Over Shook 0,75"-1" 7,500.00 Bh
13 Watermur 0,75" 13,500.00 Bh
14 Stop Kran 0,75" 54,600.00 Bh
15 Kran Air 0,75" 27,500.00 Bh
16 Pipa PVC AW 1" 110,000.00 btg
17 Knee 1" 8,500.00 Bh
18 Shook 1" 6,000.00 Bh
19 Tee 1" 8,500.00 Bh
20 Watermur 1" 14,500.00 Bh
21 Stop Kran 1" 17,000.00 Bh
22 Pipa PVC AW 1,5" 78,000.00 btg
23 Knee 1,5" 9,000.00 Bh
24 Shook 1,5" 7,000.00 Bh
25 Tee 1,5" 10,000.00 Bh
26 Watermur 1,5" 19,500.00 Bh
27 Stop Kran 1,5" 22,000.00 Bh
28 Pipa PVC AW 2" 211,500.00 btg
29 Knee 2" 11,000.00 Bh
30 Shook 2" 9,000.00 Bh
31 Tee 2" 12,000.00 Bh
32 Watermur 2" 22,500.00 Bh
33 Stop Kran 2" 23,000.00 Bh
34 Pipa PVC AW 2,5" 91,000.00 btg
35 Pipa PVC AW 3" 120,000.00 btg
36 Pipa PVC AW 4" 290,000.00 btg
37 Knee 2" 26,000.00 Bh
38 Shook 2" 25,000.00 Bh
39 Tee 2" 29,000.00 Bh
40 Pipa konduit dia 5/8 inch 59,000.00 btg
41 Pipa Galvanis 0,5" 190,000.00 btg
42 Pipa Galvanis 0,75" 265,000.00 btg
43 Pipa Galvanis 1" 365,000.00 btg
44 Pipa Galvanis 1,5" 335,000.00 btg
45 Pipa Galvanis 2" 380,000.00 btg
46 Pipa Galvanis 3" 410,000.00 M'
47 Pipa Galvanis 4" 520,000.00 btg
48 Pipa GIP 1/2" 78,000.00 btg
49 Pipa Stainless Steel Dia. 1,5 " 40,000.00 M'
50 Elbow 4" 17,500.00 bh
L. Bahan Sanitair dan Perpipaan
HARGA
NO JENIS BAHAN SATUAN
Rp.
1 Kran Air 25,000.00 bh
2 Floor Drain 15,000.00 bh
3 Closet Jongkok 270,000.00 bh
4 Closet Duduk 755,000.00 bh
5 Bak Air Mandi 220,000.00 bh
6 Bak Cuci Stainless Steel 325,000.00 bh
7 Bak Fibreglass 400,000.00 bh
8 Washtafel 400,000.00 bh
9 Urinoir 325,000.00 bh
10 Tangki Air Kap. 1100 Ltr 1,200,000.00 Unit
11 Mesin Pompa Air 350 Watt 900,000.00 Unit
12 Water Drain + asesories 175,000.00 Set
M. Bahan Penutup Atap
1 Seng Gelombang BJLS 0,30 85,000.00 Lbr
2 Seng Plat BJLS 30 lebar 90 cm 55,000.00 M1
3 Atap Spandek Galvalum 54,500.00 m2
4 Nok Tepi Seng Gelombang 15,000.00 m1
5 Nok Tepi Atap Spandek 32,000.00 M'
N. Bahan Alat Penggantung dan Kunci
1 Kunci Pintu 180,000.00 Bh
2 Kunci Bulat 92,000.00 Bh
3 Kunci Tanam biasa 150,000.00 Bh
4 Kunci Tanam Kamar Mandi 125,000.00 Bh
5 Kunci Pintu 2 x Putar ( lever handle ) 210,000.00 Bh
6 Sloot Tanam / Grendel pintu 31,500.00 Bh
7 Grendel Jendela 27,825.00 Bh
8 Kait Angin 20,000.00 ps
9 Engsel Pintu 4 " 37,000.00 Bh
10 Engsel Jendela 3 " 32,000.00 Bh
11 Kunci laci 20,000.00 set
12 Pegangan/Handle Pintu 5,000.00 Bh
13 Knop Tarikan 2,500.00 Bh
14 Kasur Busa 750,000.00 Bh
15 Imitatie Lear 5,000.00 Unit
16 Sekrup 5 cm 500.00 Bh
17 Kunci Lemari 17,500.00 Bh
18 Engsel Pita 25,000.00 psg
19 Rel Pita 15,000.00 psg
20 Promika 15,000.00 Bh
21 Kasur Busa 950,000.00 Bh
22 Kaca / Cermin muka 400,000.00 Bh
23 Gantungan Baju 45,000.00 Bh
24 Plank nama ruangan 100,000.00 Set
25 Handel tarik jendela 13,000.00 Bh
26 Grabbed Bar 320,000.00 set
O. Bahan Jadi Penampung Tinja
1 Ijuk 15,000.00 Kg
P. Alat-alat Listrik
1 Kabel 1x2,5mm NYM 8,000.00 M1
2 Kabel 2x2,5mm NYM 15,000.00 M1
3 Kabel 3x1,5mm NYM 10,500.00 M1
4 Kabel 3x2,5mm NYM 13,000.00 M1
5 Kabel 3x4mm NYY 35,000.00 M1
6 Saklar Tunggal setara Broco 25,000.00 Bh
7 Saklar Ganda setara Broco 32,500.00 Bh
8 Stop Kontak setara Broco 22,500.00 Bh
9 Lampu TL 2 x 40 watt + armaturnya, setara Phillips 85,000.00 Set
10 Lampu Pijar 25 watt setara Phillips + fitting 50,000.00 Bh
HARGA
NO JENIS BAHAN SATUAN
Rp.
11 Box Sekring 5,000.00 Bh
12 Inbowdoos 4,500.00 Bh
13 Isolasi/Seal Tape 15,000.00 Bh
14 Klem Kabel 1,428.57 Bh
15 MCB 113,500.00 Bh
16 Panel Box Utama 500,000.00 Bh
17 Air 60,000.00 m3
18 T Dos 3,000.00 Bh
19 L Bow 4,000.00 Bh
20 Las Dop 3,000.00 Bh
21 Fitting 15,000.00 Bh
22 Lampu SL 20 W 60,000.00 Bh
23 Lampu SL 18 W 55,000.00 Bh
Analisa HARGA SATUAN
Acuan : Permen PUPR No. 1 Tahun 2022
Jenis Pekerjaan : Pengukuran dan pemasangan Bouwplank
Satuan Pembayaran : M1
Harga Satuan Pekerjaan : Rp 56,930.50 1.1.d
Harga Jumlah
No Komponen Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja Oh 0.100 72,000.00 7,200.00
2 Tukang Oh 0.100 80,000.00 8,000.00
3 Kepala Tukang Oh 0.010 90,000.00 900.00
4 Mandor Oh 0.005 100,000.00 500.00
Jumlah A 16,600.00
B BAHAN
1 Kayu 5/7 Kelas M3 0.012 2,100,000.00 25,200.00
2 Kayu papan 3/20 M3 0.007 1,365,000.00 9,555.00
3 Paku 2"-3" Kg 0.020 20,000.00 400.00
Jumlah B 35,155.00
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 51,755.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 5,175.50
Total Harga 56,930.50
Satuan Pembayaran : M2
Harga Satuan Pekerjaan : Rp 61,930.00 3.3.4
Harga Jumlah
No Komponen Satuan Koefisien Satuan Dasar Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja Oh 0.070 72,000.00 5,040.00
2 Tukang Oh 0.009 80,000.00 720.00
3 Kepala Tukang Oh 0.006 90,000.00 540.00
4 Mandor Oh 0.003 100,000.00 300.00
Jumlah A 6,600.00
BAHAN
1 Cat Meni Kg 0.200 45,000.00 9,000.00
2 Plamir Kayu Kg 0.150 50,000.00 7,500.00
3 Cat dasar Kg 0.170 70,000.00 11,900.00
4 Cat penutup Kg 0.260 70,000.00 18,200.00
5 Kuas Bh 0.010 25,000.00 250.00
6 Pengencer Kg 0.030 45,000.00 1,350.00
6 Ampelas Lbr 0.200 7,500.00 1,500.00
Jumlah B 49,700.00
C PERALATAN
1 Alat Bantu Ls - -
Jumlah C -
Biaya Langsung ( A + B + C ) 56,300.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 5,630.00
Total Harga 61,930.00
Satuan Pembayaran : M2
Harga Satuan Pekerjaan : Rp 15,792.70 3.3.10
Harga Jumlah
No Komponen Satuan Koefisien Satuan Dasar Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja Oh 0.020 72,000.00 1,440.00
2 Tukang Oh 0.063 80,000.00 5,040.00
3 Kepala Tukang Oh 0.0063 90,000.00 567.00
4 Mandor Oh 0.003 100,000.00 300.00
Jumlah A 7,347.00
BAHAN
1 Plamir Tembok Kg 0.100 12,500.00 1,250.00
2 Cat dasar Kg 0.100 16,000.00 1,600.00
3 Cat penutup Kg 0.260 16,000.00 4,160.00
Jumlah B 7,010.00
C PERALATAN
1 Alat Bantu Ls - -
Jumlah C -
Biaya Langsung ( A + B + C ) 14,357.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 1,435.70
Total Harga 15,792.70
Satuan Pembayaran : M2
Harga Satuan Pekerjaan : Rp 33,449.78 A.4.7.1.10
Harga Jumlah
No Komponen Satuan Koefisien Satuan Dasar Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja Oh 0.020 72,000.00 1,440.00
2 Tukang Oh 0.063 80,000.00 5,040.00
3 Kepala Tukang Oh 0.0063 90,000.00 567.00
4 Mandor Oh 0.003 100,000.00 300.00
Jumlah A 7,347.00
BAHAN
1 Cat dasar (No Drop) Kg 0.100 64,060.80 6,406.08
2 Cat penutup (No Drop) Kg 0.260 64,060.80 16,655.81
Jumlah B 23,061.89
C PERALATAN
1 Alat Bantu Ls - -
Jumlah C -
Biaya Langsung ( A + B + C ) 30,408.89
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 3,040.89
Total Harga 33,449.78
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 758,400.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 75,840.00
Total Harga 834,240.00
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 15,300.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 1,530.00
Total Harga 16,830.00
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 8,200.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 820.00
Total Harga 9,020.00
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 2,440.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 244.00
Total Harga 2,684.00
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 548,000.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 54,800.00
Total Harga 602,800.00
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 10,525.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 1,052.50
Total Harga 11,577.50
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 12,965.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 1,296.50
Total Harga 14,261.50
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 9,500.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 950.00
Total Harga 10,450.00
ANALISA HARGA SATUAN
Acuan : SNI. Edisi Rev. 2005
Jenis Pekerjaan : Pembongkaran rabat beton (Bongkaran tidak dipakai lagi)
Satuan Pembayaran : M2
Harga Satuan Pekerjaan : Rp 4,235.00
Harga Jumlah
No Komponen Satuan Koefisien Satuan Dasar Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja Oh 0.050 72,000.00 3,600.00
3 Mandor Oh 0.0025 100,000.00 250.00
Jumlah A 3,850.00
B BAHAN
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 3,850.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 385.00
Total Harga 4,235.00
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 11,050.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 1,105.00
Total Harga 12,155.00
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 8,200.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 820.00
Total Harga 9,020.00
ANALISA HARGA SATUAN
Acuan : SNI. Edisi Rev. 2005
Jenis Pekerjaan : Pembongkaran kusen (Bongkaran tidak dipakai lagi)
Satuan Pembayaran : M3
Harga Satuan Pekerjaan : Rp 99,550.00
Harga Jumlah
No Komponen Satuan Koefisien Satuan Dasar Harga
(Rp) (Rp)
A TENAGA KERJA
1 Tukang Kayu Oh 1.000 80,000.00 80,000.00
2 Kepala Tukang Oh 0.100 90,000.00 9,000.00
3 Mandor Oh 0.0150 100,000.00 1,500.00
Jumlah A 90,500.00
B BAHAN
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 90,500.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 9,050.00
Total Harga 99,550.00
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 7,300.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 730.00
Total Harga 8,030.00
Jumlah B -
C PERALATAN
1 Alat Bantu Ls -
Jumlah C -
Biaya Langsung ( A + B + C ) 2,670.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 267.00
Total Harga 2,937.00
ANALISA HARGA SATUAN
Acuan : Permen PUPR No. 1 Tahun 2022
Jenis Pekerjaan : Pengecatan 1 m2 Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Satuan Pembayaran : M2
Harga Satuan Pekerjaan : Rp 11,939.40 3.3.11.(c)
Harga Jumlah
No Komponen Satuan Koefisien Satuan Dasar Harga
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja Oh 0.028 72,000.00 2,016.00
2 Tukang Oh 0.042 80,000.00 3,360.00
3 Kepala Tukang Oh 0.004 90,000.00 378.00
4 Mandor Oh 0.003 100,000.00 300.00
Jumlah A 6,054.00
BAHAN
1 Cat dasar Kg 0.120 16,000.00 1,920.00
2 Cat penutup Kg 0.180 16,000.00 2,880.00
Jumlah B 4,800.00
C PERALATAN
1 Alat Bantu Ls - -
Jumlah C -
Biaya Langsung ( A + B + C ) 10,854.00
Biaya Umum dan Keuntungan dari Biaya Langsung 10% 1,085.40
Total Harga 11,939.40