Anda di halaman 1dari 15

DAFTAR HARGA SATUAN

PROGRAM : PENINGKATAN PRODUKSI KETAHANAN PANGAN


KEGIATAN : DAK BIDANG PERTANIAN
PEKERJAAN : PEMBANGUNAN RUMAH RMU 6 X 6
LOKASI : GAPOKTAN HAPAKAT KEL. KOTA BESI HULU KEC. KOTA BESI KAB. KOTAWARINGIN TIMUR

HARGA SATUAN
NO. URAIAN SAT. KETERANGAN
Rp
A. JENIS PASIR / BATU / TANAH
1 Pasir urug M3 482,000.00
2 Pasir pasang M3 518,800.00
3 Pasir beton M3 518,800.00
4 Tanah urug biasa M3 457,500.00
5 Split 3/5 M3 803,000.00

B. JENIS BATU BUATAN


1 Batu Belah M3 970,000.00
2 Bata merah bj 1,374.00
3 Bataco Biji 5,100.00
4 Beton krawang Biji 11,688.00
5 Paving stone bj 6,250.00

C. JENIS BAHAN PENGIKAT


1 Semen PC ( Isi 40 Kg / Zak ) Zak 71,000.00
2 Semen putih Kg 1,650.00

D. JENIS BESI / BAJA


1 Besi beton polos Ø 8 Btg 40,000.00
2 Besi beton polos Ø 10 Btg 50,500.00
3 Besi beton polos Ø 12 Btg 87,000.00
4 Besi beton polos Kg 10,870.00
5 Kawat beton Kg 23,100.00

E. JENIS KAYU
1 Papan kayu kelas I M3 10,731,000.00
2 Papan kayu kelas II M3 4,810,000.00
3 Papan kayu kelas III M3 1,885,000.00
4 Balok kayu klas I M3 6,662,500.00
5 Balok kayu klas II M3 4,562,000.00
6 Balok kayu kelas III M3 1,885,000.00
7 Kayu bulat bahan perancah M3 1,885,000.00
8 Kayu dolken ( galam) Btg 25,000.00
9 Kayu dolken ( hutan) Btg 15,950.00
10 List kayu profil Btg 16,000.00
F. JENIS BAHAN ATAP / PLUMBING
1 Atap Genteng Metal lbr 47,000.00
2 Bubungan Metal M 35,000.00
3 Paku anti karat Kg 27,000.00
4 Paku seng Kg 26,000.00
5 Paku kayu Kg 23,400.00
6 Paku ulin Kg 25,700.00
7 Paku plywood / teakwood Kg 31,000.00
8 Plywood 2,7mm Lbr 75,700.00
J. JENIS BAHAN CAT
1 Tinner Ltr 34,500.00
2 Cat tembok Kg 30,200.00
3 Plamir tembok Kg 15,000.00
4 Cat kayu mengkilat Kg 78,000.00
5 Dempul kayu Kg 35,472.00
6 Cat meni Kg 33,000.00
7 Cat kayu dasar Kg 33,000.00
8 Ter / Residu Ltr 11,292.00
9 Ampelas Lbr 7,500.00
10 Lem kayu Kg 45,156.00
11 Kuas Bh 15,000.00
I. PENGGANTUNG DAN PENGUNCI
1 Engsel 3" ( standar ) Psg 47,000.00
2 Engsel 4" ( standar ) Psg 64,400.00
3 Engsel 5" ( standar ) Psg 74,700.00
4 Kunci tanam 2 slag Bh 200,000.00

J. INSTALASI LISTRIK
1 Stop kontak + Instalasi (bangunan beton) Ttk 217,692.00
2 Titik lampu + Instalasi (bangunan beton) Ttk 217,692.00
3 Sakelar tunggal Bh 20,000.00
4 Sakelar ganda Bh 40,000.00
5 MCB 1 group Bh 44,000.00
6 Lampu SL 11 watt Bh 59,000.00
7 Lampu SL 15 watt Bh 65,000.00
L. UPAH TENAGA KERJA PERHARI
1 Mandor Or/Hr 220,000.00
2 Kepala tukang Or/Hr 220,000.00
3 Tukang Or/Hr 175,000.00
4 Pekerja Or/Hr 125,000.00
RENCANA ANGGARAN BIAYA (R A B)
PROGRAM : PENINGKATAN PRODUKSI KETAHANAN PANGAN
KEGIATAN : DAK BIDANG PERTANIAN
PEKERJAAN : PEMBANGUNAN RUMAH RMU 6 X 6
LOKASI : GAPOKTAN HAPAKAT KEL. KOTA BESI HULU KEC. KOTA BESI KAB. KOTAWARINGIN TIMUR

HARGA
No ITEM PEKERJAAN VOL SAT ANALISA SATUAN TOTAL
(Rp.) (Rp.)
1 2 3 4 5 6 7
I PEKERJAAN FISIK
A PEKERJAAN PENDAHULUAN
1 Pengukuran dan pasang bouwplank 1.000 ls LS 1,500,000.00 1,500,000.00
2 Papan nama proyek 1.000 ls LS 100,000.00 100,000.00
3 Pembersihan lahan 1.000 ls LS 2,500,000.00 2,500,000.00
Jumlah A 4,100,000.00
B PEKERJAAN TANAH
1 Galian tanah untuk pondasi 8.000 M3 02.6.1 58,800.00 470,400.00
2 Timbunan kembali bekas galian 4.000 M 3
02.6.9 28,180.00 112,720.00
3 Timbunan peningggian tanah 28.800 M3 02.6.11.a 588,700.00 16,954,560.00
4 Timbunan pasir di bawah pondasi 3.600 M2 02.6.11 618,100.00 2,225,160.00
JUMLAH B 19,762,840.00
C PEKERJAAN PASANGAN
1 Pekerjaan trucuk kayu galam p = 4 m' 72.000 btg Ls 45,000.00 3,240,000.00
2 Lantai kerja 1.800 M3 07.6.2 1,620,306.00 2,916,550.80
3 Pekerjaan Beton 5.856 M 3
07.6.38 4,557,691.00 26,689,838.50
4 Pasangan bataco 79.440 M2 04.6.23 155,422.40 12,346,755.46
5 Pasangan peninggian dengan bataco 9.600 M2 04.6.23 155,422.40 1,492,055.04
6 Pekerjaan Plesteran 221.280 M2 05.6.4 75,681.00 16,746,691.68
7 Pasang kerawang 16.800 M2 Ls 45,000.00 756,000.00
8 Dudukan mesin RMU 1.000 Unit LS 5,000,000.00 5,000,000.00
JUMLAH C 69,187,891.47
D PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pekerjaan kusen ulin
- Kusen P1 1.000 BH Ls 1,065,000.00 1,065,000.00
2 Pekerjaan daun pintu panil
- Daun pintu P1 Kayu ulin 2.000 BH Ls 1,500,000.00 3,000,000.00
3 Kunci tanam 1.000 BH Ls 200,000.00 200,000.00
4 Engsel pintu 6.000 BH Ls 64,400.00 386,400.00
5 Grendel 4.000 BH Ls 15,000.00 60,000.00
6 Daun pintu besi lengkap dengan rel geser 1.000 BH Ls 10,000,000.00 10,000,000.00
JUMLAH D 14,711,400.00
E PEKERJAAN ATAP
1 Kuda-kuda 5/10 cm, ikatan angin 5/7 kayu lanan 0.363 M3 06.6.28 7,890,920.00 2,860,458.50
2 Gording 5/10, Nok 5/10 , balok tembok 5/10 0.456 M3 06.6.28 7,890,920.00 3,598,259.52
3 Pasang usuk dan reng 86.640 M2 06.6.31 91,104.00 7,893,250.56
4 List plang papan ulin 2/20 38.000 M' 06.6.52 85,520.00 3,249,760.00
5 Atap seng galvalum 86.640 M2 08.6.38 119,390.00 10,343,949.60
6 Nok seng 7.600 M' 08.6.39 58,760.00 446,576.00
7 Cat Kayu lisplank 7.600 M2 14.6.8 46,665.00 354,654.00
JUMLAH E 28,746,908.18
F PEKERJAAN PLAFON
1 Rangka plafon kayu lanan 5/5 36.000 M2 06.6.40 138,178.00 4,974,408.00
2 Plafon kalsiboard 36.000 M2 09.6.10 58,087.50 2,091,150.00
3 List plafon kayu frofil 48.000 M' 06.6.60 23,904.00 1,147,392.00
JUMLAH F 8,212,950.00
G PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pasang Kunci tanam 1.000 Bh 12.6.2 291,600.00 291,600.00
2 Pasang engsel pintu 6.000 Bh 12.6.5 69,640.00 417,840.00
JUMLAH G 709,440.00
H PEKERJAAN PENGECATAN
1 Pengecatan cat kayu 20.841 M2 14.6.8 46,665.00 972,545.27
2 Mengecat tembok 221.280 M2 14.6.14 26,039.50 5,762,020.56
3 Mengecat plafon 36.000 M2 14.6.14 26,039.50 937,422.00
JUMLAH H 7,671,987.82
I PEKERJAAN INSTALASI LISTRIK
1 Titik lampu dan instalasinya 5.000 Ttk Ls 217,692.00 1,088,460.00
2 Stop kontak dan instalasinya 2.000 Ttk Ls 217,692.00 435,384.00
3 Lampu SL 1 x 20 watt 4.000 bh Ls 65,000.00 260,000.00
4 Lampu SL 1 x 10 watt 1.000 bh Ls 25,000.00 25,000.00
5 Saklar tunggal 1.000 bh Ls 20,000.00 20,000.00
6 Saklar ganda 1.000 bh Ls 40,000.00 40,000.00
7 MCB Group 6 A 1.000 bh Ls 44,000.00 44,000.00
JUMLAH I 1,912,844.00
PEKERJAAN FISIK (I) 155,016,261.48
II BIAYA PENUNJANG DAK 25,000,000.00
TOTAL JUMLAH A s/d J 180,016,261.48
DIBULATKAN 180,000,000.00

Sampit, JUNI 2020


Mengetahui / Menyetujui : Dibuat Oleh :
Plt Kepala Dinas Ketahanan Pangan GAPOKTAN HAPAKAT
Kabupaten Kotawaringin Timur

Ir. H. HANIP BUDINUGROHO HARIS


NIP : 19611210 198603 1 025
REKAPITULASI
RENCANA ANGGARAN BIAYA (R A B)
PROGRAM : PENINGKATAN PRODUKSI KETAHANAN PANGAN
KEGIATAN : DAK BIDANG PERTANIAN
PEKERJAAN : PEMBANGUNAN RUMAH RMU 6 X 6
LOKASI : GAPOKTAN HAPAKAT KEL. KOTA BESI HULU KEC. KOTA BESI KAB. KOTAWARINGIN TIMUR

NO. ITEM PEKERJAAN TOTAL (Rp)

I PEKERJAAN FISIK
A. PEKERJAAN PENDAHULUAN 4,100,000.00

B. PEKERJAAN TANAH 19,762,840.00

C. PEKERJAAN PASANGAN 69,187,891.47

D. PEKERJAAN PENGGANTUNG DAN PENGUNCI 14,711,400.00

E. PEKERJAAN ATAP 28,746,908.18

F. PEKERJAAN PLAFON 8,212,950.00

G. PEKERJAAN KUNCI DAN PENGGANTUNG 709,440.00

H. PEKERJAAN PENGECATAN 7,671,987.82

I. PEKERJAAN INSTALASI LISTRIK 1,912,844.00

PEKERJAAN FISIK 155,016,261.48

II BIAYA PENUNJANG DAK 25,000,000.00

Jumlah I S/D II 180,016,261.48


Dibulatkan 180,000,000.00
Terbilang : SERATUS DELAPAN PULUH JUTA RUPIAH

Mengetahui / Menyetujui : Sampit, JUNI 2020


Plt Kepala Dinas Ketahanan Pangan Dibuat Oleh :
Kabupaten Kotawaringin Timur GAPOKTAN HAPAKAT

Ir. H. HANIP BUDINUGROHO HARIS


NIP : 19611210 198603 1 025
PERHITUNGAN VOLUME

PROGRAM : PENINGKATAN PRODUKSI KETAHANAN PANGAN


KEGIATAN : DAK BIDANG PERTANIAN
PEKERJAAN : PEMBANGUNAN RUMAH RMU 6 X 6
LOKASI : GAPOKTAN HAPAKAT KEL. KOTA BESI HULU KEC. KOTA BESI KAB. KOTAWARINGIN TIMUR

PROSES PERHITUNGAN VOLUME


NO. U R A I A N SAT
p (m) l (m) t (m) kel (m) L (m2) V (m3) Jml
A PEKERJAAN PENDAHULUAN
1 Pengukuran dan pasang bouwplank ls 1.0000

I PEKERJAAN TANAH
1 Galian tanah untuk pondasi M3 0.90 0.90 0.70 3.20 0.63 0.57 1.00 8.00 8.0000
8.0000

2 Timbunan kembali bekas galian M3 Setengah dari galian pondasi 4.0000

3 Timbunan peningggian tanah M3


Timbunan tanah di dalam rumah 6.00 6.00 0.80 24.00 36.00 28.80 - 1.00 28.8000

28.8000

3 Timbunan pasir di bawah pondasi M3


Timbunan pasir di dalam rumah 6.00 6.00 0.10 12.20 0.60 3.60 - 1.00 3.6000
Timbunan pasir teras -
Timbunan pasir d bawah pondasi -
3.6000

II PEKERJAAN PASANGAN
1 Pekerjaan trucuk kayu galam p = 4 m' btg 9.00 - 8.00 72.0000

2 Lantai kerja M3
di dalam rumah 6.00 6.00 0.05 12.10 36.00 1.80 - 1.00 1.8000
teras - - 0.05 0.10 - - - 1.00 -
d bawah pondasi - - 0.05 0.10 - - - 8.00 -
1.8000
3 Pekerjaan Beton
- Pondasi M3 0.80 0.80 0.20 0.64 0.128 - 12.00 1.5360
- Sloof 20/30 24.00 0.20 0.35 4.80 1.68 - 1.00 1.6800
- Kolom 20/20 3.50 0.20 0.20 - 0.04 0.140 - 12.00 1.6800
- Ring balk 20/20 24.00 0.20 0.20 - 0.04 0.960 - 1.00 0.9600
5.8560

4 Pasangan bataco M2 30.00 - 3.20 - 96.00 - - 1.00 96.0000


Pas. Penahan tanah keliling bangunan - - - - - - 2.00 2.00 -
96.0000
Pengurangan P1 - 2.00 2.40 - 5.76 - - 1.00 5.7600
P2 1.80 2.20 - 4.84 - - 1.00 -
Angin-angin 1 2.70 0.40 1.08 - - 10.00 10.8000
16.5600
jumlah 79.4400

5 Pasangan peninggian dengan bataco M2 24.00 - 0.40 - 9.60 - 1.00 9.6000

4 Pekerjaan Plesteran M2
- Sama dengan luas pasangan bataco 79.44 - 2.00 158.8800
- Plesteran Sloof 24.00 0.35 8.40 1.00 2.00 16.8000
- Plesteran Kolom 3.50 0.20 0.70 2.00 12.00 16.8000
- Plesteran Ring balk 24.00 0.20 4.80 2.00 1.00 9.6000
plesteran peninggian 24.00 0.40 9.60 - 1.00 2.00 19.2000
221.2800
7 Pekerjaan cat tembok M2 sama dengan pekerjaan plesteran 1.00 221.28 221.2800

III PEKERJAAN PENGGANTUNG DAN PENGUNCI

1 Pekerjaan kusen ulin 5/10


- Kusen P2 1.0000
- Kusen Angin-angin 2 10.8000
2 Pekerjaan daun pintu panil bh
- Daun pintu P2 lanan 2.00 2.0000

3 Pekerjaan Daun Jendela bh


- Daun Jendela PJ1 1.00 - -
- Daun Jendela J1 2.00 - -
4 Pekerjaan Pasang kaca bening 5 mm m2
- PJ 0.60 1.10 0.66 1.00 0.6600
- BW 0.40 0.40 0.16 2.00 1.00 0.3200
0.9800

5 Pekerjaan daun pintu dorong dari besi unit 1.0000

VIII PEKERJAAN ATAP


1 Kuda-kuda 5/10 cm, ikatan angin 5/7 kayu lanan M3
Kaki kuda-kuda 1 5.70 0.05 0.10 2.00 0.0570
Balok tarik 6.00 0.05 0.10 1.00 0.0300
Balok jepit 4.00 0.05 0.10 2.00 0.0400
Balok sokong 2.30 0.05 0.10 2.00 0.0230
Tiang gantung utama 2.65 0.05 0.10 1.00 0.0133
Tiang gantung kedua 1.30 0.05 0.10 2.00 0.0130
Balok pengunci 1.00 0.05 0.10 1.00 0.0050
Volume 1 kuda-kuda 0.1813
Volume untuk 2 kuda-kuda 0.3625

Ikatan angin 4.00 0.05 0.07 0.01 3.00 2.00 0.0840


0.4465
2 Gording 5/10, Nok 5/10 , balok tembok 5/10 M3
7.60 0.05 0.10 0.04 12.00 0.4560

4 Kasau dan reng kayu lanan M2 7.60 5.70 43.32 2.00 86.6400

5 List plang papan lanan 2/20 M1 38.00 1.00 38.0000

6 Atap genteng metal M2 Sama dengan luasan kaso dan reng 86.6400

7 Nok genteng metal M1 7.60 1.00 7.6000

VII PEKERJAAN PLAFON


1 Rangka plafon kayu lanan 5/7
M2 6.00 6.00 36.00 1.00 36.0000

2 Plafon plywood 3 mm M2 Sama dengan luas rangka 36.0000


3 List plafon kayu frofil
R. Dalam M' 6.00 - - - - 2.00 12.0000
6.00 - - - - 6.00 36.0000
48.0000
X PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pasang Kunci tanam Bh 1.00 1.00 1.0000
2 Pasang engsel pintu Bh 3.00 1.00 3.0000
3 Pasang engsel jendela Bh 2.00 - -
4 Pasang grendel Bh 1.00 - -
5 Pasang tarikan jendela Bh 1.00 - -
6 Pasang kait angin Bh 2.00 - -

XI PEKERJAAN PENGECATAN
1 Pengecatan cat kayu M2
Kuzen PJ1 2.40 0.15 0.36 2.00 0.7200
1.60 0.15 0.24 1.00 0.2400
1.60 0.20 0.32 1.00 0.3200
2.30 0.20 0.46 1.00 0.4600
1.30 0.20 0.26 1.00 0.2600
2.0000
Jumlah Kuzen PJ1 = - -

Kuzen J1 1.60 0.15 0.24 2.00 0.4800


1.30 0.15 0.20 2.00 0.3900
1.60 0.20 0.32 1.00 0.3200
1.1900
Jumlah Kuzen J1 = - -

Kuzen KM/WC 2.40 0.15 0.36 2.00 0.7200


0.70 0.15 0.11 1.00 0.1050
0.8250
Jumlah 1.00 0.8250

Daun Pintu Panil 0.80 2.10 1.68 2.00 2.00 6.7200


Jumlah D. Pintu = 2.00 13.4400

Kusen BW 0.80 0.15 0.12 2.00 0.2400


0.40 0.15 0.06 2.00 0.1200
Jumlah - -

Angin-angin 1 2.80 0.15 0.42 1.00 1.00 0.4200


Angin-angin 2 3.80 0.15 0.57 1.00 10.80 6.1560
Total 20.8410

2 Menggosok dan mendempul tembok + kolom selasar M2


Tembok Sama dengan luasan plaster + acian
Kolom selasar Sama dengan luasan plaster + acian 221.2800
221.2800

4 Mengecat kilap kusen, daun pintu, M2 Sama dengan luas menggosok dan mendempul 20.8410
daun jendela, list plang, jalusi dan list plafon
(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat kilap)
5 Mengecat tembok + kolom selasar M2 Sama dengan luas menggosok dan mendempul 221.2800
(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6 Mengecat plafon M2 Sama dengan luasan pekerjaan plafon 36.0000

XIII PEKERJAAN INSTALASI LISTRIK


1 Titik lampu dan instalasinya Ttk 5.0000
2 Stop kontak dan instalasinya Ttk 2.0000
3 Lampu SL 1 x 20 watt Bh 4.0000
4 Lampu SL 1 x 10 watt Bh 1.0000
5 Saklar tunggal Bh 1.0000
6 Saklar ganda Bh 1.0000
7 MCB Group 6 A Bh 1.0000

XIII PEKERJAAN PAS SEKELILING BANGUNAN


1 Pekerjaan Galian M3 28.00 0.40 0.50 5.60 1.00 5.6000
2 Pekerjaan pas batako M2 28.00 0.20 0.50 1.20 33.60 1.00 33.6000
3 Pekerjaan Plesteran M2 28.00 0.20 0.50 1.60 44.80 1.00 44.8000
4 Pekerjaan cor beton M3 28.00 0.20 5.60 1.00 5.6000
ANALISA BIAYA PEKERJAAN

PROGRAM : PENINGKATAN PRODUKSI KETAHANAN PANGAN


KEGIATAN : DAK BIDANG PERTANIAN
PEKERJAAN : PEMBANGUNAN RUMAH RMU 6 X 6
LOKASI : GAPOKTAN HAPAKAT KEL. KOTA BESI HULU KEC. KOTA BESI KAB. KOTAWARINGIN TIMUR

ANALISA
HARGA SATUAN
URAIAN PEKERJAAN UPAH (Rp) BAHAN (Rp) JUMLAH (Rp)
(Rp)
( SNI )
1 2 3 4 5 6

02.6.1 1 M³ Galian tanah biasa sedalam 1 meter.


0.4000 Pekerja Rp 125,000.00 Rp 50,000.00
0.0400 Mandor Rp 220,000.00 Rp 8,800.00
Rp 58,800.00 Rp - Rp 58,800.00

02.6.9 1 M³ Urugan kembali


0.1920 Pekerja Rp 125,000.00 Rp 24,000.00
0.0190 Mandor Rp 220,000.00 Rp 4,180.00
Rp 28,180.00 Rp - Rp 28,180.00

02.6.10 1 M³ Pemadatan tanah


0.5000 Pekerja Rp 125,000.00 Rp 62,500.00
0.0500 Mandor Rp 220,000.00 Rp 11,000.00
Rp 73,500.00 Rp - Rp 73,500.00

02.6.11 1 M³ Urugan pasir


1.2000 M³ Pasir urug Rp 482,000.00 Rp 578,400.00
0.3000 Pekerja Rp 125,000.00 Rp 37,500.00
0.0100 Mandor Rp 220,000.00 Rp 2,200.00
Rp 39,700.00 Rp 578,400.00 Rp 618,100.00

02.6.11.a 1 M³ Urugan tanah


1.2000 M³ Tanah urug Rp 457,500.00 Rp 549,000.00
0.3000 Pekerja Rp 125,000.00 Rp 37,500.00
0.0100 Mandor Rp 220,000.00 Rp 2,200.00
Rp 39,700.00 Rp 549,000.00 Rp 588,700.00

04.6.3 1 M² Pasang bata merah tebal 1 bata, camp. 1Pc : 3Ps.


140.0000 Bh Batu bata Rp 1,374.00 Rp 192,360.00
32.9500 Kg Semen PC Rp 1,775.00 Rp 58,486.25
0.0910 M³ Pasir pasang Rp 518,800.00 Rp 47,210.80
0.6500 Pekerja Rp 125,000.00 Rp 81,250.00
0.2000 Tukang batu Rp 175,000.00 Rp 35,000.00
0.0200 Kepala tukang Rp 175,000.00 Rp 3,500.00
0.0300 Mandor Rp 220,000.00 Rp 6,600.00
Rp 126,350.00 Rp 298,057.05 Rp 424,407.05

04.6.4 1 M² Pasang bata merah tebal 1 bata, camp.1Pc : 4Ps.


140.0000 Bh Batu bata Rp 1,374.00 Rp 192,360.00
26.5500 Kg Semen PC Rp 1,775.00 Rp 47,126.25
0.0930 M³ Pasir pasang Rp 518,800.00 Rp 48,248.40
0.6500 Pekerja Rp 125,000.00 Rp 81,250.00
0.2000 Tukang batu Rp 175,000.00 Rp 35,000.00
0.0200 Kepala tukang Rp 175,000.00 Rp 3,500.00
0.0300 Mandor Rp 220,000.00 Rp 6,600.00
Rp 126,350.00 Rp 287,734.65 Rp 414,084.65

04.6.10 1 M² Pasang bata merah tebal ½ bata, camp. 1Pc : 3Ps.


70.0000 Bh Batu bata Rp 1,374.00 Rp 96,180.00
14.3700 Kg Semen PC Rp 1,775.00 Rp 25,506.75
0.0400 M³ Pasir pasang Rp 518,800.00 Rp 20,752.00
0.3200 Pekerja Rp 125,000.00 Rp 40,000.00
0.1000 Tukang batu Rp 175,000.00 Rp 17,500.00
0.0100 Kepala tukang Rp 175,000.00 Rp 1,750.00
0.0150 Mandor Rp 220,000.00 Rp 3,300.00
Rp 62,550.00 Rp 142,438.75 Rp 204,988.75
04.6.11 1 M² Pasang bata merah tebal ½ bata, camp. 1Pc : 4Ps.
70.0000 Bh Batu bata Rp 1,374.00 Rp 96,180.00
11.5000 Kg Semen PC Rp 1,775.00 Rp 20,412.50
0.0430 M³ Pasir pasang Rp 518,800.00 Rp 22,308.40
0.3200 Pekerja Rp 125,000.00 Rp 40,000.00
0.1000 Tukang batu Rp 175,000.00 Rp 17,500.00
0.0100 Kepala tukang Rp 175,000.00 Rp 1,750.00
0.0150 Mandor Rp 220,000.00 Rp 3,300.00
Rp 62,550.00 Rp 138,900.90 Rp 201,450.90

04.6.23 1 M² Pasangan dinding conblock / bataco uk. 10 x 20 x 40 cm


12.5000 Bh Concrete block / bataco Rp 5,100.00 Rp 63,750.00
7.2000 Kg Semen PC Rp 1,775.00 Rp 12,780.00
0.0230 M³ Pasir pasang Rp 518,800.00 Rp 11,932.40
0.3400 Pekerja Rp 125,000.00 Rp 42,500.00
0.1070 Tukang batu Rp 175,000.00 Rp 18,725.00
0.0114 Kepala tukang Rp 175,000.00 Rp 1,995.00
0.0170 Mandor Rp 220,000.00 Rp 3,740.00
Rp 66,960.00 Rp 88,462.40 Rp 155,422.40

05.6.3 1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm


6.4800 Kg Semen PC Rp 1,775.00 Rp 11,502.00
0.0190 M³ Pasir pasang Rp 518,800.00 Rp 9,857.20
0.2000 Pekerja Rp 125,000.00 Rp 25,000.00
0.1500 Tukang batu Rp 175,000.00 Rp 26,250.00
0.0150 Kepala tukang Rp 175,000.00 Rp 2,625.00
0.0100 Mandor Rp 220,000.00 Rp 2,200.00
Rp 56,075.00 Rp 21,359.20 Rp 77,434.20

05.6.4 1 M² Plesteran 1 Pc : 4 Ps, tebal 15 mm


5.2000 Kg Semen PC Rp 1,775.00 Rp 9,230.00
0.0200 M³ Pasir pasang Rp 518,800.00 Rp 10,376.00
0.2000 Pekerja Rp 125,000.00 Rp 25,000.00
0.1500 Tukang batu Rp 175,000.00 Rp 26,250.00
0.0150 Kepala tukang Rp 175,000.00 Rp 2,625.00
0.0100 Mandor Rp 220,000.00 Rp 2,200.00
Rp 56,075.00 Rp 19,606.00 Rp 75,681.00

06.6.28 1 M³ Pasang konstruksi kuda-kuda kayu lanan


1.1000 M³ Balok kayu lanan Rp 4,562,000.00 Rp 5,018,200.00
15.0000 Kg Besi strip Rp - Rp -
0.8000 Kg Paku kayu Rp 23,400.00 Rp 18,720.00
4.0000 Pekerja Rp 125,000.00 Rp 500,000.00
12.0000 Tukang kayu Rp 175,000.00 Rp 2,100,000.00
1.2000 Kepala tukang Rp 175,000.00 Rp 210,000.00
0.2000 Mandor Rp 220,000.00 Rp 44,000.00
Rp 2,854,000.00 Rp 5,036,920.00 Rp7,890,920.00

06.6.31 1 M² Pasang kasau + reng genteng metal kayu lanan


0.0120 M³ Balok kayu lanan Rp 4,562,000.00 Rp 54,744.00
0.1500 Kg Paku kayu Rp 23,400.00 Rp 3,510.00
0.1000 Pekerja Rp 125,000.00 Rp 12,500.00
0.1000 Tukang kayu Rp 175,000.00 Rp 17,500.00
0.0100 Kepala tukang Rp 175,000.00 Rp 1,750.00
0.0050 Mandor Rp 220,000.00 Rp 1,100.00
Rp 32,850.00 Rp 58,254.00 Rp 91,104.00

06.6.40 1 M² Pasang rangka langit-langit (60 x 1,20) m kayu lanan


0.0115 M³ Balok kayu lanan Rp 4,562,000.00 Rp 52,463.00
0.1000 Kg Paku kayu Rp 23,400.00 Rp 2,340.00
0.1500 Pekerja Rp 125,000.00 Rp 18,750.00
0.2500 Tukang kayu Rp 175,000.00 Rp 43,750.00
0.0250 Kepala tukang Rp 175,000.00 Rp 4,375.00
0.0750 Mandor Rp 220,000.00 Rp 16,500.00
Rp 83,375.00 Rp 54,803.00 Rp 138,178.00
06.6.52 1 M² Pasang lisplang ukuran 2 x (2 x 20) cm, kayu lanan
0.0086 M³ Papan kayu lanan Rp 4,810,000.00 Rp 41,366.00
0.0600 Kg Paku kayu Rp 23,400.00 Rp 1,404.00
0.1000 Pekerja Rp 125,000.00 Rp 12,500.00
0.1000 Tukang kayu Rp 175,000.00 Rp 17,500.00
0.0100 Kepala tukang Rp 175,000.00 Rp 1,750.00
0.0500 Mandor Rp 220,000.00 Rp 11,000.00
Rp 42,750.00 Rp 42,770.00 Rp 85,520.00

06.6.52.a 1 M² Pasang lisplang ukuran 2 x (2 x 20) cm, kayu ulin


0.0086 M³ Papan kayu ulin Rp 10,731,000.00 Rp 92,286.60
0.0600 Kg Paku ulin Rp 25,700.00 Rp 1,542.00
0.1000 Pekerja Rp 125,000.00 Rp 12,500.00
0.1000 Tukang kayu Rp 175,000.00 Rp 17,500.00
0.0100 Kepala tukang Rp 175,000.00 Rp 1,750.00
0.0500 Mandor Rp 220,000.00 Rp 11,000.00
Rp 42,750.00 Rp 93,828.60 Rp 136,578.60
Untuk 2x20 cm …………………….…………… =1/2 x 06.6.52.a Rp 21,375.00 Rp 46,914.30 Rp 68,289.30

06.6.60 1 M' Pasang list plafond kayu profil


1.0500 M' Kayu profil Rp 16,000.00 Rp 16,800.00
0.0100 Kg Paku biasa Rp 23,400.00 Rp 234.00
0.0210 Pekerja Rp 125,000.00 Rp 2,625.00
0.0210 Tukang kayu Rp 175,000.00 Rp 3,675.00
0.0020 Kepala tukang Rp 175,000.00 Rp 350.00
0.0010 Mandor Rp 220,000.00 Rp 220.00
Rp 6,870.00 Rp 17,034.00 Rp 23,904.00

07.6.2 1 M³ Membuat beton tumbuk, camp. 1Pc : 3Ps : 6Kr.


197.0000 Kg Semen PC Rp 1,775.00 Rp 349,675.00
0.4700 M³ Pasir beton Rp 518,800.00 Rp 243,836.00
0.9400 M³ Split 3/5 Rp 803,000.00 Rp 754,820.00
1.6500 Pekerja Rp 125,000.00 Rp 206,250.00
0.2500 Tukang batu Rp 175,000.00 Rp 43,750.00
0.0250 Kepala tukang Rp 175,000.00 Rp 4,375.00
0.0800 Mandor Rp 220,000.00 Rp 17,600.00
Rp 271,975.00 Rp 1,348,331.00 Rp1,620,306.00

07.6.13 1 M³ Membuat beton bertulang, camp. 1Pc : 2Ps : 3Kr.


336.0000 Kg Semen PC Rp 1,775.00 Rp 596,400.00
0.5400 M³ Pasir beton Rp 518,800.00 Rp 280,152.00
0.8100 M³ Split 3/5 Rp 803,000.00 Rp 650,430.00
2.0000 Pekerja Rp 125,000.00 Rp 250,000.00
0.3500 Tukang batu Rp 175,000.00 Rp 61,250.00
0.0350 Kepala tukang Rp 175,000.00 Rp 6,125.00
1.0000 Mandor Rp 220,000.00 Rp 220,000.00
Rp 537,375.00 Rp 1,526,982.00 Rp2,064,357.00

07.6.25 1 Kg Pembesian dengan besi polos / ulir


1.0500 Kg Besi beton polos Rp 10,870.00 Rp 11,413.50
0.0150 Kg Kawat bendrat Rp 23,100.00 Rp 346.50
0.0070 Pekerja Rp 125,000.00 Rp 875.00
0.0070 Tukang besi Rp 175,000.00 Rp 1,225.00
0.0007 Kepala tukang Rp 175,000.00 Rp 122.50
0.0003 Mandor Rp 220,000.00 Rp 66.00
Rp 2,288.50 Rp 11,760.00 Rp 14,048.50

07.6.28 1 M² Pasang bekisting


0.0400 M³ Papan kayu klas III Rp 1,885,000.00 Rp 75,400.00
0.3000 Kg Paku kayu Rp 23,400.00 Rp 7,020.00
0.1000 Lt Minyak bekisting Rp - Rp -
0.3000 Pekerja Rp 125,000.00 Rp 37,500.00
0.2600 Tukang kayu Rp 175,000.00 Rp 45,500.00
0.0260 Kepala tukang Rp 175,000.00 Rp 4,550.00
0.0050 Mandor Rp 220,000.00 Rp 1,100.00
Rp 88,650.00 Rp 82,420.00 Rp 171,070.00

07.6.38 1 M³ Membuat pondasi beton bertulang (150 kg besi + bekisting)


0.2000 M³ Papan kayu klas III Rp 1,885,000.00 Rp 377,000.00
1.5000 Kg Paku kayu Rp 23,400.00 Rp 35,100.00
0.4000 Lt Minyak bekisting Rp - Rp -
150.0000 Kg Besi beton polos Rp 10,870.00 Rp 1,630,500.00
2.2500 Kg Kawat beton Rp 23,100.00 Rp 51,975.00
323.0000 Kg Semen PC Rp 1,775.00 Rp 573,325.00
0.5200 M³ Pasir beton Rp 518,800.00 Rp 269,776.00
0.7800 M³ Koral beton Rp 803,000.00 Rp 626,340.00
3.9000 Pekerja Rp 125,000.00 Rp 487,500.00
0.3500 Tukang batu Rp 175,000.00 Rp 61,250.00
1.0400 Tukang kayu Rp 175,000.00 Rp 182,000.00
1.0500 Tukang besi Rp 175,000.00 Rp 183,750.00
0.2450 Kepala tukang Rp 175,000.00 Rp 42,875.00
0.1650 Mandor Rp 220,000.00 Rp 36,300.00
Rp 993,675.00 Rp 3,564,016.00 Rp4,557,691.00
08.6.32 1 M² Pasang atap genteng metal
0.6900 M2 Genteng metal tebal 0,25 mm Rp 47,000.00 Rp 32,430.00
0.0750 Kg Paku anti karat Rp 27,000.00 Rp 2,025.00
0.2000 Pekerja Rp 125,000.00 Rp 25,000.00
0.1000 Tukang kayu Rp 175,000.00 Rp 17,500.00
0.0100 Kepala tukang Rp 175,000.00 Rp 1,750.00
0.0010 Mandor Rp 220,000.00 Rp 220.00
Genteng metal tebal 0,25 mm Rp 44,470.00 Rp 34,455.00 Rp 78,925.00

08.6.36 1 M' Pasang nok genteng metal


1.0000 M' Bubungan metal Rp 35,000.00 Rp 35,000.00
0.0075 Kg Paku anti karat Rp 27,000.00 Rp 202.50
0.2500 Pekerja Rp 125,000.00 Rp 31,250.00
0.1500 Tukang kayu Rp 175,000.00 Rp 26,250.00
0.0150 Kepala tukang Rp 175,000.00 Rp 2,625.00
0.0130 Mandor Rp 220,000.00 Rp 2,860.00
Rp 62,985.00 Rp 35,202.50 Rp 98,187.50

08.6.38 1 M² Pasang Atap seng gavalum


0.7000 Lbr Seng gavalum Rp 130,000.00 Rp 91,000.00
0.0200 Kg Paku seng Rp 26,000.00 Rp 520.00
0.1200 Pekerja Rp 125,000.00 Rp 15,000.00
0.0600 Tukang kayu Rp 175,000.00 Rp 10,500.00
0.0060 Kepala tukang Rp 175,000.00 Rp 1,050.00
0.0060 Mandor Rp 220,000.00 Rp 1,320.00
Rp 27,870.00 Rp 91,520.00 Rp 119,390.00

08.6.39 1 M' Pasang nok seng


1.0000 m' Seng plat BJLS 30 L = 40 cm Rp 24,000.00 Rp 24,000.00
0.0400 Kg Paku seng Rp 26,000.00 Rp 1,040.00
0.1500 Pekerja Rp 125,000.00 Rp 18,750.00
0.0700 Tukang kayu Rp 175,000.00 Rp 12,250.00
0.0080 Kepala tukang Rp 175,000.00 Rp 1,400.00
0.0060 Mandor Rp 220,000.00 Rp 1,320.00
Rp 33,720.00 Rp 25,040.00 Rp 58,760.00

09.6.10 1 M² Langit-langit plywood (60 x 120) cm, tebal 2,7 mm.


0.3750 Lbr Plywood 4' x 8' x 2.7 mm Rp 75,700.00 Rp 28,387.50
0.0300 Kg Paku plywood Rp 31,000.00 Rp 930.00
0.0700 Pekerja Rp 125,000.00 Rp 8,750.00
0.1000 Tukang kayu Rp 175,000.00 Rp 17,500.00
0.0100 Kepala tukang Rp 175,000.00 Rp 1,750.00
0.0035 Mandor Rp 220,000.00 Rp 770.00
Rp 28,770.00 Rp 29,317.50 Rp 58,087.50

09.6.10a 1 M² Dinding Partisi (60 x 120) cm, tebal 2,7 mm.


0.3750 Lbr Kalsiboard Rp 88,692.00 Rp 33,259.50
0.0300 Kg Paku plywood Rp 35,472.00 Rp 1,064.16
0.0700 Pekerja Rp 125,000.00 Rp 8,750.00
0.1000 Tukang kayu Rp 175,000.00 Rp 17,500.00
0.0100 Kepala tukang Rp 175,000.00 Rp 1,750.00
0.0035 Mandor Rp 220,000.00 Rp 770.00
Rp 28,770.00 Rp 34,323.66 Rp 63,093.66

12.6.2 1 Buah pasang kunci tanam biasa


1.0000 Bh Kunci tanam biasa Rp 200,000.00 Rp 200,000.00
0.0100 Pekerja Rp 125,000.00 Rp 1,250.00
0.5000 Tukang kayu Rp 175,000.00 Rp 87,500.00
0.0100 Kepala tukang Rp 175,000.00 Rp 1,750.00
0.0050 Mandor Rp 220,000.00 Rp 1,100.00
Rp 91,600.00 Rp 200,000.00 Rp 291,600.00

12.6.3 1 Buah pasang kunci tanam kamar mandi


1.0000 Bh Kunci tanam kamar mandi Rp 200,000.00 Rp 200,000.00
0.0500 Pekerja Rp 125,000.00 Rp 6,250.00
0.5000 Tukang kayu Rp 175,000.00 Rp 87,500.00
0.0500 Kepala tukang Rp 175,000.00 Rp 8,750.00
0.0025 Mandor Rp 220,000.00 Rp 550.00
Rp 103,050.00 Rp 200,000.00 Rp 303,050.00

12.6.5 1 Buah pasang engsel pintu


1.0000 Bh Engsel pintu Rp 37,350.00 Rp 37,350.00
0.0150 Pekerja Rp 125,000.00 Rp 1,875.00
0.1500 Tukang kayu Rp 175,000.00 Rp 26,250.00
0.0150 Kepala tukang Rp 175,000.00 Rp 2,625.00
0.0070 Mandor Rp 220,000.00 Rp 1,540.00
Rp 32,290.00 Rp 37,350.00 Rp 69,640.00

12.6.6 1 Buah pasang engsel jendela kupu-kupu


1.0000 Bh Engsel jendela Rp 23,500.00 Rp 23,500.00
0.0100 Pekerja Rp 125,000.00 Rp 1,250.00
0.1000 Tukang kayu Rp 175,000.00 Rp 17,500.00
0.0100 Kepala tukang Rp 175,000.00 Rp 1,750.00
0.0050 Mandor Rp 220,000.00 Rp 1,100.00
Rp 21,600.00 Rp 23,500.00 Rp 45,100.00

12.6.9 1 Buah pasang Hak angin


1.0000 Bh Hak angin Rp - Rp -
0.0150 Pekerja Rp 125,000.00 Rp 1,875.00
0.1500 Tukang kayu Rp 175,000.00 Rp 26,250.00
0.0150 Kepala tukang Rp 175,000.00 Rp 2,625.00
0.0080 Mandor Rp 220,000.00 Rp 1,760.00
Rp 32,510.00 Rp - Rp 32,510.00

12.6.17 1 M² pasang kaca, tebal 5 mm


1.1000 M² Kaca tebal 5 mm Rp - Rp -
0.0150 Pekerja Rp 125,000.00 Rp 1,875.00
0.1500 Tukang kayu Rp 175,000.00 Rp 26,250.00
0.0150 Kepala tukang Rp 175,000.00 Rp 2,625.00
0.0080 Mandor Rp 220,000.00 Rp 1,760.00
Rp 32,510.00 Rp - Rp 32,510.00

13.6.44 1 M² Pasang lantai keramik 20 x 20 cm


1.0000 M² Keramik 20 x 20 cm (merk Asia) Rp - Rp -
11.3800 Kg Semen PC Rp 1,775.00 Rp 20,199.50
0.0420 M³ Pasir pasang Rp 518,800.00 Rp 21,789.60
1.5000 Kg Semen warna Rp 1,650.00 Rp 2,475.00
0.6200 Pekerja Rp 125,000.00 Rp 77,500.00
0.3500 Tukang batu Rp 175,000.00 Rp 61,250.00
0.0350 Kepala tukang Rp 175,000.00 Rp 6,125.00
0.0300 Mandor Rp 220,000.00 Rp 6,600.00
Keramik 20 x 20 cm Rp 151,475.00 Rp - Rp 151,475.00

13.6.47 1 M² Pasang lantai keramik 30 x 30 cm


1.0000 M² Keramik 30 x 30 cm merk Asia Rp - Rp -
11.3800 Kg Semen PC Rp 1,775.00 Rp 20,199.50
0.0420 M³ Pasir pasang Rp 518,800.00 Rp 21,789.60
1.5000 Kg Semen warna Rp 1,650.00 Rp 2,475.00
0.6200 Pekerja Rp 125,000.00 Rp 77,500.00
0.3500 Tukang batu Rp 175,000.00 Rp 61,250.00
0.0350 Kepala tukang Rp 175,000.00 Rp 6,125.00
0.0300 Mandor Rp 220,000.00 Rp 6,600.00
Keramik 30 x 30 cm merk Asia ……………………. Rp 151,475.00 Rp - Rp 151,475.00

13.6.48 1 M² Pasang lantai keramik 30 x 30 cm


1.0000 M² Keramik 30 x 30 cm Rp - Rp -
11.3800 Kg Semen PC Rp 1,775.00 Rp 20,199.50
0.0420 M³ Pasir pasang Rp 518,800.00 Rp 21,789.60
1.5000 Kg Semen warna Rp 1,650.00 Rp 2,475.00
0.6200 Pekerja Rp 125,000.00 Rp 77,500.00
0.3500 Tukang batu Rp 175,000.00 Rp 61,250.00
0.0350 Kepala tukang Rp 175,000.00 Rp 6,125.00
0.0300 Mandor Rp 220,000.00 Rp 6,600.00
Rp 151,475.00 Rp 44,464.10 Rp 195,939.10

13.6.47 1 M² Pasang lantai keramik 40 x 40 cm


1.0000 M² Keramik 40 x 40 cm merk Asia Rp 96,000.00 Rp 96,000.00
11.3800 Kg Semen PC Rp 1,775.00 Rp 20,199.50
0.0420 M³ Pasir pasang Rp 518,800.00 Rp 21,789.60
1.5000 Kg Semen warna Rp 1,650.00 Rp 2,475.00
0.6200 Pekerja Rp 125,000.00 Rp 77,500.00
0.3500 Tukang batu Rp 175,000.00 Rp 61,250.00
0.0350 Kepala tukang Rp 175,000.00 Rp 6,125.00
0.0300 Mandor Rp 220,000.00 Rp 6,600.00
Keramik 40 x 40 cm merk Asia ……………………. Rp 151,475.00 Rp 140,464.10 Rp 291,939.10

13.6.68 1 M² Pasang dinding keramik 20 x 20 cm


1.0000 M² Keramik 20 x 20 cm merk Asia Rp - Rp -
9.3000 Kg Semen PC Rp 1,775.00 Rp 16,507.50
0.0180 M³ Pasir pasang Rp 518,800.00 Rp 9,338.40
1.5000 Kg Semen warna Rp 1,650.00 Rp 2,475.00
0.6000 Pekerja Rp 125,000.00 Rp 75,000.00
0.4500 Tukang batu Rp 175,000.00 Rp 78,750.00
0.0450 Kepala tukang Rp 175,000.00 Rp 7,875.00
0.0300 Mandor Rp 220,000.00 Rp 6,600.00
……………………. Rp 168,225.00 Rp - Rp 168,225.00

13.6.68 1 M² Pasang dinding keramik 20 x 25 cm


1.0000 M² Keramik 20 x 25 cm merk Asia Rp 74,000.00 Rp 74,000.00
9.3000 Kg Semen PC Rp 1,775.00 Rp 16,507.50
0.0180 M³ Pasir pasang Rp 518,800.00 Rp 9,338.40
1.5000 Kg Semen warna Rp 1,650.00 Rp 2,475.00
0.6000 Pekerja Rp 125,000.00 Rp 75,000.00
0.4500 Tukang batu Rp 175,000.00 Rp 78,750.00
0.0450 Kepala tukang Rp 175,000.00 Rp 7,875.00
0.0300 Mandor Rp 220,000.00 Rp 6,600.00
Keramik 20 x 25 cm merk Asia ……………………. Rp 168,225.00 Rp 74,000.00 Rp 242,225.00
14.6.8 1 M² Pengecatan bidang kayu baru (1 lapis plamir,
1 lapis cat dasar, 2 lapis cat penutup)
0.2000 Kg Cat meni Rp 33,000.00 Rp 6,600.00
0.1500 Kg Plamir Rp 15,000.00 Rp 2,250.00
0.1700 Kg Cat dasar Rp 33,000.00 Rp 5,610.00
0.2600 Kg Cat penutup Rp 78,000.00 Rp 20,280.00
0.0700 Pekerja Rp 125,000.00 Rp 8,750.00
0.0090 Tukang cat Rp 175,000.00 Rp 1,575.00
0.0060 Kepala tukang Rp 175,000.00 Rp 1,050.00
0.0025 Mandor Rp 220,000.00 Rp 550.00
Rp 11,925.00 Rp 34,740.00 Rp 46,665.00

14.6.12 1 M² Pelaburan bidang kayu dengan residu / ter


0.3500 Ltr Ter atau residu Rp 11,292.00 Rp 3,952.20
0.1000 Pekerja Rp 125,000.00 Rp 12,500.00
0.0060 Mandor Rp 220,000.00 Rp 1,320.00
Rp 13,820.00 Rp 3,952.20 Rp 17,772.20

14.6.14 1 M² Pengecatan bidang tembok baru (1 lapis plamir,


1 lapis cat dasar, 2 lapis cat penutup).
0.1000 Kg Plamir Rp 15,000.00 Rp 1,500.00
0.1000 Kg Cat dasar Rp 15,100.00 Rp 1,510.00
0.2600 Kg Cat penutup 2 x Rp 30,200.00 Rp 7,852.00
0.0200 Pekerja Rp 125,000.00 Rp 2,500.00
0.0630 Tukang cat Rp 175,000.00 Rp 11,025.00
0.0063 Kepala tukang Rp 175,000.00 Rp 1,102.50
0.0025 Mandor Rp 220,000.00 Rp 550.00
Rp 15,177.50 Rp 10,862.00 Rp 26,039.50