HARGA SATUAN
NO. URAIAN SAT. KETERANGAN
Rp
A. JENIS PASIR / BATU / TANAH
1 Pasir urug M3 482,000.00
2 Pasir pasang M3 518,800.00
3 Pasir beton M3 518,800.00
4 Tanah urug biasa M3 457,500.00
5 Split 3/5 M3 803,000.00
E. JENIS KAYU
1 Papan kayu kelas I M3 10,731,000.00
2 Papan kayu kelas II M3 4,810,000.00
3 Papan kayu kelas III M3 1,885,000.00
4 Balok kayu klas I M3 6,662,500.00
5 Balok kayu klas II M3 4,562,000.00
6 Balok kayu kelas III M3 1,885,000.00
7 Kayu bulat bahan perancah M3 1,885,000.00
8 Kayu dolken ( galam) Btg 25,000.00
9 Kayu dolken ( hutan) Btg 15,950.00
10 List kayu profil Btg 16,000.00
F. JENIS BAHAN ATAP / PLUMBING
1 Atap Genteng Metal lbr 47,000.00
2 Bubungan Metal M 35,000.00
3 Paku anti karat Kg 27,000.00
4 Paku seng Kg 26,000.00
5 Paku kayu Kg 23,400.00
6 Paku ulin Kg 25,700.00
7 Paku plywood / teakwood Kg 31,000.00
8 Plywood 2,7mm Lbr 75,700.00
J. JENIS BAHAN CAT
1 Tinner Ltr 34,500.00
2 Cat tembok Kg 30,200.00
3 Plamir tembok Kg 15,000.00
4 Cat kayu mengkilat Kg 78,000.00
5 Dempul kayu Kg 35,472.00
6 Cat meni Kg 33,000.00
7 Cat kayu dasar Kg 33,000.00
8 Ter / Residu Ltr 11,292.00
9 Ampelas Lbr 7,500.00
10 Lem kayu Kg 45,156.00
11 Kuas Bh 15,000.00
I. PENGGANTUNG DAN PENGUNCI
1 Engsel 3" ( standar ) Psg 47,000.00
2 Engsel 4" ( standar ) Psg 64,400.00
3 Engsel 5" ( standar ) Psg 74,700.00
4 Kunci tanam 2 slag Bh 200,000.00
J. INSTALASI LISTRIK
1 Stop kontak + Instalasi (bangunan beton) Ttk 217,692.00
2 Titik lampu + Instalasi (bangunan beton) Ttk 217,692.00
3 Sakelar tunggal Bh 20,000.00
4 Sakelar ganda Bh 40,000.00
5 MCB 1 group Bh 44,000.00
6 Lampu SL 11 watt Bh 59,000.00
7 Lampu SL 15 watt Bh 65,000.00
L. UPAH TENAGA KERJA PERHARI
1 Mandor Or/Hr 220,000.00
2 Kepala tukang Or/Hr 220,000.00
3 Tukang Or/Hr 175,000.00
4 Pekerja Or/Hr 125,000.00
RENCANA ANGGARAN BIAYA (R A B)
PROGRAM : PENINGKATAN PRODUKSI KETAHANAN PANGAN
KEGIATAN : DAK BIDANG PERTANIAN
PEKERJAAN : PEMBANGUNAN RUMAH RMU 6 X 6
LOKASI : GAPOKTAN HAPAKAT KEL. KOTA BESI HULU KEC. KOTA BESI KAB. KOTAWARINGIN TIMUR
HARGA
No ITEM PEKERJAAN VOL SAT ANALISA SATUAN TOTAL
(Rp.) (Rp.)
1 2 3 4 5 6 7
I PEKERJAAN FISIK
A PEKERJAAN PENDAHULUAN
1 Pengukuran dan pasang bouwplank 1.000 ls LS 1,500,000.00 1,500,000.00
2 Papan nama proyek 1.000 ls LS 100,000.00 100,000.00
3 Pembersihan lahan 1.000 ls LS 2,500,000.00 2,500,000.00
Jumlah A 4,100,000.00
B PEKERJAAN TANAH
1 Galian tanah untuk pondasi 8.000 M3 02.6.1 58,800.00 470,400.00
2 Timbunan kembali bekas galian 4.000 M 3
02.6.9 28,180.00 112,720.00
3 Timbunan peningggian tanah 28.800 M3 02.6.11.a 588,700.00 16,954,560.00
4 Timbunan pasir di bawah pondasi 3.600 M2 02.6.11 618,100.00 2,225,160.00
JUMLAH B 19,762,840.00
C PEKERJAAN PASANGAN
1 Pekerjaan trucuk kayu galam p = 4 m' 72.000 btg Ls 45,000.00 3,240,000.00
2 Lantai kerja 1.800 M3 07.6.2 1,620,306.00 2,916,550.80
3 Pekerjaan Beton 5.856 M 3
07.6.38 4,557,691.00 26,689,838.50
4 Pasangan bataco 79.440 M2 04.6.23 155,422.40 12,346,755.46
5 Pasangan peninggian dengan bataco 9.600 M2 04.6.23 155,422.40 1,492,055.04
6 Pekerjaan Plesteran 221.280 M2 05.6.4 75,681.00 16,746,691.68
7 Pasang kerawang 16.800 M2 Ls 45,000.00 756,000.00
8 Dudukan mesin RMU 1.000 Unit LS 5,000,000.00 5,000,000.00
JUMLAH C 69,187,891.47
D PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pekerjaan kusen ulin
- Kusen P1 1.000 BH Ls 1,065,000.00 1,065,000.00
2 Pekerjaan daun pintu panil
- Daun pintu P1 Kayu ulin 2.000 BH Ls 1,500,000.00 3,000,000.00
3 Kunci tanam 1.000 BH Ls 200,000.00 200,000.00
4 Engsel pintu 6.000 BH Ls 64,400.00 386,400.00
5 Grendel 4.000 BH Ls 15,000.00 60,000.00
6 Daun pintu besi lengkap dengan rel geser 1.000 BH Ls 10,000,000.00 10,000,000.00
JUMLAH D 14,711,400.00
E PEKERJAAN ATAP
1 Kuda-kuda 5/10 cm, ikatan angin 5/7 kayu lanan 0.363 M3 06.6.28 7,890,920.00 2,860,458.50
2 Gording 5/10, Nok 5/10 , balok tembok 5/10 0.456 M3 06.6.28 7,890,920.00 3,598,259.52
3 Pasang usuk dan reng 86.640 M2 06.6.31 91,104.00 7,893,250.56
4 List plang papan ulin 2/20 38.000 M' 06.6.52 85,520.00 3,249,760.00
5 Atap seng galvalum 86.640 M2 08.6.38 119,390.00 10,343,949.60
6 Nok seng 7.600 M' 08.6.39 58,760.00 446,576.00
7 Cat Kayu lisplank 7.600 M2 14.6.8 46,665.00 354,654.00
JUMLAH E 28,746,908.18
F PEKERJAAN PLAFON
1 Rangka plafon kayu lanan 5/5 36.000 M2 06.6.40 138,178.00 4,974,408.00
2 Plafon kalsiboard 36.000 M2 09.6.10 58,087.50 2,091,150.00
3 List plafon kayu frofil 48.000 M' 06.6.60 23,904.00 1,147,392.00
JUMLAH F 8,212,950.00
G PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pasang Kunci tanam 1.000 Bh 12.6.2 291,600.00 291,600.00
2 Pasang engsel pintu 6.000 Bh 12.6.5 69,640.00 417,840.00
JUMLAH G 709,440.00
H PEKERJAAN PENGECATAN
1 Pengecatan cat kayu 20.841 M2 14.6.8 46,665.00 972,545.27
2 Mengecat tembok 221.280 M2 14.6.14 26,039.50 5,762,020.56
3 Mengecat plafon 36.000 M2 14.6.14 26,039.50 937,422.00
JUMLAH H 7,671,987.82
I PEKERJAAN INSTALASI LISTRIK
1 Titik lampu dan instalasinya 5.000 Ttk Ls 217,692.00 1,088,460.00
2 Stop kontak dan instalasinya 2.000 Ttk Ls 217,692.00 435,384.00
3 Lampu SL 1 x 20 watt 4.000 bh Ls 65,000.00 260,000.00
4 Lampu SL 1 x 10 watt 1.000 bh Ls 25,000.00 25,000.00
5 Saklar tunggal 1.000 bh Ls 20,000.00 20,000.00
6 Saklar ganda 1.000 bh Ls 40,000.00 40,000.00
7 MCB Group 6 A 1.000 bh Ls 44,000.00 44,000.00
JUMLAH I 1,912,844.00
PEKERJAAN FISIK (I) 155,016,261.48
II BIAYA PENUNJANG DAK 25,000,000.00
TOTAL JUMLAH A s/d J 180,016,261.48
DIBULATKAN 180,000,000.00
I PEKERJAAN FISIK
A. PEKERJAAN PENDAHULUAN 4,100,000.00
I PEKERJAAN TANAH
1 Galian tanah untuk pondasi M3 0.90 0.90 0.70 3.20 0.63 0.57 1.00 8.00 8.0000
8.0000
28.8000
II PEKERJAAN PASANGAN
1 Pekerjaan trucuk kayu galam p = 4 m' btg 9.00 - 8.00 72.0000
2 Lantai kerja M3
di dalam rumah 6.00 6.00 0.05 12.10 36.00 1.80 - 1.00 1.8000
teras - - 0.05 0.10 - - - 1.00 -
d bawah pondasi - - 0.05 0.10 - - - 8.00 -
1.8000
3 Pekerjaan Beton
- Pondasi M3 0.80 0.80 0.20 0.64 0.128 - 12.00 1.5360
- Sloof 20/30 24.00 0.20 0.35 4.80 1.68 - 1.00 1.6800
- Kolom 20/20 3.50 0.20 0.20 - 0.04 0.140 - 12.00 1.6800
- Ring balk 20/20 24.00 0.20 0.20 - 0.04 0.960 - 1.00 0.9600
5.8560
4 Pekerjaan Plesteran M2
- Sama dengan luas pasangan bataco 79.44 - 2.00 158.8800
- Plesteran Sloof 24.00 0.35 8.40 1.00 2.00 16.8000
- Plesteran Kolom 3.50 0.20 0.70 2.00 12.00 16.8000
- Plesteran Ring balk 24.00 0.20 4.80 2.00 1.00 9.6000
plesteran peninggian 24.00 0.40 9.60 - 1.00 2.00 19.2000
221.2800
7 Pekerjaan cat tembok M2 sama dengan pekerjaan plesteran 1.00 221.28 221.2800
4 Kasau dan reng kayu lanan M2 7.60 5.70 43.32 2.00 86.6400
6 Atap genteng metal M2 Sama dengan luasan kaso dan reng 86.6400
XI PEKERJAAN PENGECATAN
1 Pengecatan cat kayu M2
Kuzen PJ1 2.40 0.15 0.36 2.00 0.7200
1.60 0.15 0.24 1.00 0.2400
1.60 0.20 0.32 1.00 0.3200
2.30 0.20 0.46 1.00 0.4600
1.30 0.20 0.26 1.00 0.2600
2.0000
Jumlah Kuzen PJ1 = - -
4 Mengecat kilap kusen, daun pintu, M2 Sama dengan luas menggosok dan mendempul 20.8410
daun jendela, list plang, jalusi dan list plafon
(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat kilap)
5 Mengecat tembok + kolom selasar M2 Sama dengan luas menggosok dan mendempul 221.2800
(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6 Mengecat plafon M2 Sama dengan luasan pekerjaan plafon 36.0000
ANALISA
HARGA SATUAN
URAIAN PEKERJAAN UPAH (Rp) BAHAN (Rp) JUMLAH (Rp)
(Rp)
( SNI )
1 2 3 4 5 6