DAFTAR HARGA SATUAN UPAH, BAHAN DAN PEKERJAAN ARSITEKTUR

KEGIATAN : PERENCANAAN GEDUNG


PEKERJAAN : PERENCANAAN DED KANTIN TEKNIK SIPIL
LOKASI : KAMPUS UNAND LIMAU MANIS PADANG
THN. ANGG. : 2016

HARGA SATUAN
NO. URAIAN SATUAN KETERANGAN
( Rp )
1 2 3 4 5

I SATUAN UPAH
1 Mandor Hari 100,000.00
2 Kepala Tukang Hari 150,000.00
3 Tukang Batu Hari 100,000.00
4 Tukang Besi Hari 100,000.00
5 Tukang Cat Hari 100,000.00
6 Tukang Kayu Hari 100,000.00
7 Tukang Las Hari 100,000.00
8 Pekerja Hari 75,000.00

II BAHAN/MATERIAL
A BAHAN BATU/ PASIR/ TANAH/ KERIKIL
1 Pasir Beton/ Pasir Pasang M³ 366,522.90
2 Batu Kali (Bulat Utuh) M³ 379,832.90
3 Kerekel Beton M³ 415,769.90
4 Pasir Timbunan/Urug M³ 195,500.00
5 Tanah Timbunan/ Tanah Bunga M³ 137,000.00
6 Split 0.5-1 Cm M³ 465,640.50
7 Sirtu M³ 415,769.90
8 Semen Portland (50 Kg/Zak) Type I setara Semen Padang Zak 95,000.00 1,900.00 /Kg
9 Tepung Apha AA (Semen Warna) Kg 13,200.00
10 Batu Bata Merah (5 x 11 x 22)/SNI Bh 1,980.00
11 Rooster R-11 Uk. 20x20x10 cm Bh 24,200.00
12 Batu Andesit Polos Bakar Uk. 15x30X1.5 cm M2 145,000.00
13 Batu Alam W.K Cirebon Uk. 20x40x1,5 cm M2 200,000.00
14 Batu Pecah/ Lempeng M2 70,000.00
15 Homogeneous Tile Polished 60x60 setara Granito Bh 88,000.00
16 Homogeneous Tile Un Polished 60x60 setara Granito Bh 77,370.00
17 Ceramic Tile Un Polished 25x25 setara Roman Bh 18,670.00
18 Ceramic Tile Un Polished 30x30 setara Roman Bh 8,280.00
19 Ceramic Tile Dinding Toilet 25x40 setara Roman Bh 7,500.00
20 Plint Granit 10 x 60 cm Bh 14,670.00
21 Step Nosing Karet (4 cm x 2 cm) Bh 27,500.00
22 Floor Hardener Kg 32,500.00

B. BAHAN KAYU
1 Kayu (Papan Kls I) setara Banio M³ 3,946,700.00
2 Kayu (Balok Kls I) setara Banio M³ 3,821,400.00
3 Kayu (Papan Kls II) setara Marsawa M³ 3,038,500.00
4 Kayu (Balok Kls II) setara Marsawa M³ 2,933,200.00
5 Kayu (Papan Kls III) setara Merantih M³ 2,444,300.00
6 Kayu (Balok Kls III) setara Merantih M³ 2,340,800.00
7 Kayu Bekisting (Papan Kls IV) M³ 1,890,600.00
8 Kayu Bekisting (Balok Kls IV) M³ 2,200,000.00
9 Dolken Kayu Φ 8-10/300 cm Btg 55,400.00
10 Plywood Tebal 9 mm Lbr 117,800.00

C. BAHAN BESI
1 Besi Beton Standar SNI setara Krakatau Stell Kg 17,190.73
2 Wiremesh M6-150 Lbr 306,000.00
3 Besi Strip/ Plat Gepeng (uk. 3/16" x 3/4" x 4 m) Kg 21,223.13
4 Besi Siku Kg 21,223.13
5 Besi Pelat Tebal 2 mm M2 470,000.00
6 Kawat Beton Kg 17,324.13
7 Paku Kg 22,627.00
8 Paku Beton 1" Kg 42,446.25
9 Paku Sekrup Kg 24,000.00
10 Paku Atap Kg 22,300.00
11 Skrup Fixer Bh 7,500.00
12 Electroda/ Kawat Las Kg 87,500.00
13 Formite/ Spacer Bh 15,000.00

Upah & Bahan ! 1 dari 4


HARGA SATUAN
NO. URAIAN SATUAN KETERANGAN
( Rp )
1 2 3 4 5

14 Hollow 20 x 40 Tebal 0.4 mm @ L=4 m' Btg 21,500.00


15 Hollow 40 x 40 Tebal 0.6 mm @ L=4 m' Btg 27,000.00
16 Pipa Stainless Stell 2" Tebal 1 mm Btg 205,000.00
17 Pipa Stainless Stell 3" Tebal 1 mm Btg 310,000.00
18 Tangga Besi Galvanish (Shaft) Unit 825,000.00
19 Railing Tangga Besi Finishing Cat Duco (Terpasang) M2 500,000.00
20 Teralis Rangka Hollow Ukiran Besi M2 450,000.00
21 Pintu Besi Rangka Hollow Ukiran Besi Lengkap Terpasang Daun 700,000.00
22 Huruf Timbul Plat Stainless Kilap 430, Tebal Pelat = 0,8 cm, H= 41 s/d 60 cm Cm 7,000.00
23 Huruf Timbul Plat Stainless Kilap 430, Tebal Pelat = 0,8 cm, H= 7 s/d 40 cm Cm 5,000.00

G. BAHAN PLAFOND DAN PARTISI


1 Fiber Cement Tebal 8 mm setara Kalsiboard Lbr 110,000.00 38,194.4 /M2
2 Fiber Cement Tebal 6 mm (1220x2440 mm) setara Kalsiboard Lbr 85,000.00 28,554.2 /M2
3 Fiber Cement Tebal 8 mm type Acustic Panel setara Kalsiboard Lbr 145,000.00 48,710.0 /M2
4 Lis Pinggir 20.20 @3m M' 6,000.00
5 Plat Hollow Bh 500.00
6 Rod M5 Drat @ 1m M' 1,200.00
7 U Clamp Hollow 20x40 Bh 1,800.00
8 Angle Clip + Paku Mesiu Bh 1,800.00
9 Skrup Gypsum Pcs 45.00
10 Compound @ 20 kg Zak 65,000.00
11 Joint Tape M' 5,000.00
12 Maintee @ 3,6 m Btg 32,500.00
13 Crosstee@1,2 m Btg 15,000.00
14 Lis Wall Angle @3 m Btg 19,000.00
15 Rod Kait/Tekuk @1 m M' 2,500.00
16 Clipper/Adjuster Bh 1,200.00
17 Ornamen Ukiran GRC M2 1,000,000.00
19 Baja Steel Stuud / Furring/Chanel M1 27,500.00

E. BAHAN CAT
1 Cat Air setara Dulux Weathershield / Exterior Kg 105,000.00
2 Cat Air setara Dulux ICI / Interior Kg 99,000.00
3 Cat Dasar Kg 26,400.00
4 Cat Minyak setara Platone Kg 53,100.00
6 Cat Batu Alam setara Propan Ltr 78,500.00
7 Minyak Cat Ltr 14,300.00
8 Plammer Kayu Kg 22,200.00
9 Plammur Tembok Kg 16,000.00
11 Dompul Kg 17,000.00
13 Kuas Bh 14,200.00
14 Thinner Ltr 17,300.00
15 Minyak Bekisting Ltr 10,600.00
16 Cat Aquaproof Kg 54,000.00
17 Membran Sheet Water proofing setara Kalsiboard Lbr 115,000.00

F. BAHAN KAMUFLASE DINDING FCP /Dinding Pelapis Exterior


1 Fiber Cement Panel =3 mm setara Kalsiplank M2 330,000.00
2 Bracket Panel 19/19 Buah 40,000.00
3 Steel Bracket 50/50 Set 4,000.00
4 Sealant Tube 20,000.00
5 Sealant M' 5,000.00
6 Rivet Pcs 100.00
7 Drill Pcs 300.00
8 Screw Pcs 650.00
9 Bolt Pcs 850.00
10 Back Up Dia. 15 mm Pcs 1,000.00
11 Masking Pcs 400.00
12 Welding Pcs 300.00
13 Dynabolt Pcs 2,650.00
14 Zinchromate M2 4,000.00

G BAHAN SANITARY
1 Closet Duduk setara TOTO CW 421 J Bh 2,460,000.00
2 Closet Duduk for Disabled setara C704L/SW784JP Bh 3,750,000.00
3 Closet Jongkok setara TOTO CE9 Bh 3,170,000.00
4 Urinoir setara TOTO U 57 Bh 2,190,000.00

Upah & Bahan ! 2 dari 4


HARGA SATUAN
NO. URAIAN SATUAN KETERANGAN
( Rp )
1 2 3 4 5

4 Jet Washer setara TOTO THX 20 White Bh 228,000.00


5 Floor Drain setara TOTO TX 1 BN Bh 404,000.00
6 Washtafel setara Toto LW 230 J Warna Putih Bh 1,460,000.00
7 Hand Shower setara Toto THX 19 B Bh 292,000.00
8 Kran Air setara TOTO Tipe T23 B13 Bh 235,000.00
9 Kran Dapur setara TOTO TXX 609 K Bh 400,000.00
10 Paper Holder setara TOTO S 20 Bh 280,000.00
11 Towel Holder setara TOTO TX 701 AEZ Bh 521,000.00
12 Cubicle Phenolic
a. Frontal, Devider Panel Conpac Laminate Phenolic 13 mm M2 1,760,000.00
b. Pintu + Door Accessories M2 2,695,000.00
- Door Panel Compact Laminate Phenolic 13 mm,
- Uk. 600 mm x 1800mm x 18mm
- Frame Standart Aluminium, Door Acsesories Stainless Stell
- Door Acsesories Stainless Stell
c. Pedestal 10 cm Stainless Stell Pcs 275,000.00
13 Cubicle Phenolic Board + accesories setara D'Cubics M2
14 Sekat Urinoir setara TOTO A 100 Bh 1,180,000.00
15 Kitchen Sink Royal setara Royal SB 1 Bh 330,000.00
16 Seal Tape Bh 3,500.00
17 Waterdrain + Acsesories Set 23,000.00
H. BAHAN ACSESORIS PINTU/JENDELA
1 Aluminium Color Anodised 3" setara Alexindo M' 95,000.00
2 Frame Daun Pintu/ Jendela Aluminium Anodized 4" setara Alexindo M' 115,000.00
3 Kaca Buram Tebal 5 mm M2 90,000.00
4 Kaca Buram Tebal 8 mm M2 120,000.00
5 Kaca Tempered Stopsol Tebal 8 mm M2 575,000.00
6 Kaca Bening Tebal 8 mm M2 140,000.00
7 Kaca Cermin Tebal 5 mm (153x122 cm) M2 135,000.00
8 Pull Handle Dekkson PH DL802 38X1000 PSS Set 1,512,500.00
9 Handle DKS LHTR 84030 Oval SSS Set 291,500.00
10 Rolling Door Besi + Acsesories M2 885,000.00
12 Escutcheon Dekkson ESCN 84030 Oval SSS Set 62,500.00
13 Cylinder Dekkson CYL DC DL65MM SN Set 162,500.00
14 Mortise Lock Dekkson MTS RL DL84030 SSS Set 257,500.00
15 Lockcase setara Solid Set 71,000.00
16 Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Set 127,000.00
17 Engsel Casement /Friction Stay Dekkson FS S/S 20" Set 443,900.00
18 Handle Casement /Dekkson CH 425 R/H NA Set 24,000.00
19 Kunci Tanam / Flush Bolt Dekkson FB 508 NA Set 104,000.00
20 Rel Pintu Geser Set 279,000.00
21 Kisi Aluminium + Frame M2 350,000.00
22 Panel Aluminium M2 475,000.00
23 Karet Kaca M' 2,000.00
24 Sealant M' 5,000.00
D. BAHAN ATAP
1 Atap Bitumen Type Bardoline setara Onduline (34x100) Lbr 140,000.00 73,684.21 /M2
2 Nok/Bubungan setara Onduline Lbr 80,000.00 75,471.70 /M'
3 Flashing setara Onduline Lbr 80,000.00 76,555.02 /M'
4 Sekrup setara Onduline (70xØ3,55 mm) Bh 1,000.00
5 Paku setara Onduline (70xØ3,55 mm) Bh 1,000.00
6 Sisalation / Aluminium Foil M2 45,000.00

I. BAHAN LANDSCAPING/ PLANTING


1 Air Ltr 18.00
2 Pupuk M3 336,000.00
3 Kanstein 40.20.10 Bh 19,000.00
4 Paving Block Warna Tebal 8 cm Type Hexagon K 225 Bh 2,600.00
5 Ketapang Kencana Putih (Varigata), T= 3-4 m Phn 275,000.00
6 Palem Ekor Tupai (Wodyetia Bifurcata), Dia. 20 cm, T = 2,5 m Phn 450,000.00
7 Palem Sikas (Encephalartos Horridus), T = 1 m Phn 150,000.00
8 Biola Cantik (Ficus Lyrata), T = 3 m Phn 250,000.00
9 Melati Mini Golden (Gardenia Mini), T = 40-50 cm Phn 12,500.00
10 Lili Brasil (Dianella Tasmanica) Phn 3,000.00
11 Puring Apel, T = 40-50 cm Btg 30,000.00
12 Sambang Dara, T = 30-40 cm Btg 17,500.00
13 Rumput Gajah Mini (Pennisetum Purperium Schamach) M2 35,000.00
14 Steger Set 70,000.00

Upah & Bahan ! 3 dari 4


HARGA SATUAN
NO. URAIAN SATUAN KETERANGAN
( Rp )
1 2 3 4 5

IV LAIN-LAIN

1 Over Head % 10.00 0.100


2 Lem Kayu Kg 16,800.00
3 Solar (Industri) Ltr 7,900.00
4 Alat Bantu Pekerjaan Set 5,000.00
5 Alat Bantu Peralatan Set 5,000.00

Padang, Desember 2016

Konsultan Perencana
CV. DINAMIKA CIPTA CONSULTANT

EZY ESA LONA, ST


Direktur

Upah & Bahan ! 4 dari 4


ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PERENCANAAN GEDUNG


PEKERJAAN : PERENCANAAN DED KANTIN TEKNIK SIPIL
LOKASI : KAMPUS UNAND LIMAU MANIS PADANG
THN.ANGG. : 2016

NO. URAIAN HARGA SATUAN UPAH BAHAN JUMLAH

1 2 3 4 5 6

A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN

1 1 M' Pengukuran dan Pemasangan Bouwplank


(RSNI T-12-2002 - Analisa 6.4)
Upah 0.1000 OH Tukang Kayu Rp. 100,000.00 Rp.
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
0.1000 OH Pekerja Rp. 75,000.00 Rp. 7,500.00
0.0050 OH Kepala Tukang Rp. 150,000.00 Rp. 750.00
Bahan 0.0070 M³ Kayu Papan 3/20 (Kayu Kls III) Rp. 2,444,300.00 Rp. 17,110.10
0.0120 M³ Kayu Balok 5/7 (kayu Kls III) Rp. 2,340,800.00 Rp. 28,089.60
0.0200 Kg Paku Rp. 22,627.00 Rp. 452.54
Jumlah Rp. 9,750.00 Rp. 45,652.24 Rp. 55,402.24
Overhead 0.1000 Rp. 5,540.22
Jumlah Rp. 60,942.46
Total Harga Satuan Pekerjaan Dibulatkan Rp. 60,900.00

B. ANALISA HARGA SATUAN PEKERJAAN TANAH

2 1 M3 Anal. Galian Tanah Biasa Sedalam 1 Meter


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.2.3.1.1)
Upah 0.7500 OH Pekerja Rp. 75,000.00 Rp. 56,250.00
0.0250 OH Mandor Rp. 100,000.00 Rp. 2,500.00
Jumlah Rp. 58,750.00 Rp. 58,750.00
Overhead 0.1000 Rp. 5,875.00
Jumlah Rp. 64,625.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 64,600.00

3 1 M3 Anal. Galian Tanah Biasa Sedalam 2 Meter


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.2.3.1.1)
Upah 0.9000 OH Pekerja Rp. 75,000.00 Rp. 67,500.00
0.0450 OH Mandor Rp. 100,000.00 Rp. 4,500.00
Jumlah Rp. 72,000.00 Rp. 72,000.00
Overhead 0.1000 Rp. 7,200.00
Jumlah Rp. 79,200.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 79,200.00

4 1 M3 Anal. Galian Tanah Biasa Sedalam 3 Meter


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.2.3.1.1)
Upah 1.0500 OH Pekerja Rp. 75,000.00 Rp. 78,750.00
0.0670 OH Mandor Rp. 100,000.00 Rp. 6,700.00
Jumlah Rp. 85,450.00 Rp. 85,450.00
Overhead 0.1000 Rp. 8,545.00
Jumlah Rp. 93,995.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 93,900.00

5 1 M3 Urugan Kembali Padat (Galian Sedalam 1 Meter)


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.2.3.1.9)
Upah 0.2500 OH Pekerja Rp. 75,000.00 Rp. 18,750.00
0.0083 OH Mandor Rp. 100,000.00 Rp. 833.33
Jumlah Rp. 19,583.33 Rp. 19,583.33
Overhead 0.1000 Rp. 1,958.33
Jumlah Rp. 21,541.67
Total Harga Satuan Pekerjaan Dibulatkan Rp. 21,500.00

6 1 M3 Anal. Urugan Tanah dipadatkan


(SNI 2835-2008 - Analisa 6.11)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0100 OH Mandor Rp. 100,000.00 Rp. 1,000.00
Bahan 1.2000 M³ Tanah Urug Rp. 137,000.00 Rp. 164,400.00
Jumlah Rp. 23,500.00 Rp. 164,400.00 Rp. 187,900.00
Overhead 0.1000 Rp. 18,790.00
Total Harga Satuan Pekerjaan Rp. 206,690.00

7 1 M3 Anal. Urugan Tanah dengan Alat Berat


Upah 0.5667 OH Pekerja Rp. 75,000.00 Rp. 42,506.02
0.1417 OH Mandor Rp. 100,000.00 Rp. 14,168.67
Bahan 1.2000 M³ Tanah Urug Rp. 137,000.00 Rp. 164,400.00
1.0000 Ls Alat Bantu Rp. 50,000.00 Rp. 50,000.00
Jumlah Rp. 56,674.70 Rp. 214,400.00 Rp. 271,074.70
Overhead 0.1000 Overhead Rp. 27,107.47
Total Harga Satuan Pekerjaan Rp. 298,182.17

8 1 M3 Anal. Urugan Pasir/ Tanah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.2.3.1.11)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0100 OH Mandor Rp. 100,000.00 Rp. 1,000.00
Bahan 1.2000 M³ Pasir Urug/ Tanah Rp. 195,500.00 Rp. 234,600.00
Jumlah Rp. 23,500.00 Rp. 234,600.00 Rp. 258,100.00
Overhead 0.1000 Rp. 25,810.00
Jumlah Rp. 283,910.00

! 1 dari 26
Total Harga Satuan Pekerjaan Dibulatkan Rp. 283,900.00

9 1 M3 Anal. Urugan Sirtu Padat


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.2.3.1.14)
Upah 0.2500 OH Pekerja Rp. 75,000.00 Rp. 18,750.00
0.0250 OH Mandor Rp. 100,000.00 Rp. 2,500.00
Bahan 1.2000 M³ Sirtu Rp. 415,769.90 Rp. 498,923.88
Jumlah Rp. 21,250.00 Rp. 498,923.88 Rp. 520,173.88
Overhead 0.1000 Rp. 52,017.39
Jumlah Rp. 572,191.27
Total Harga Satuan Pekerjaan Dibulatkan Rp. 572,100.00

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

10 1 M3 Anal. Pondasi Batu Kali 1 : 3


(SNI 2836-2008 - Analisa 6.1)
Upah 1.5000 OH Pekerja Rp. 75,000.00 Rp. 112,500.00
0.0750 OH Mandor Rp. 100,000.00 Rp. 7,500.00
0.7500 OH Tukang Batu Rp. 100,000.00 Rp. 75,000.00
0.0750 OH Kepala Tukang Rp. 150,000.00 Rp. 11,250.00
Bahan 1.2000 M3 Batu Kali Rp. 379,832.90 Rp. 455,799.48
202.0000 Kg Semen Portland ( 50 Kg/Zak ) Rp. 1,900.00 Rp. 383,800.00
0.4850 M3 Pasir Pasang Rp. 366,522.90 Rp. 177,763.61
Jumlah Rp. 206,250.00 Rp. 1,017,363.09 Rp. 1,223,613.09
Overhead 0.1000 Rp. 122,361.31
Jumlah Rp. 1,345,974.40
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,345,900.00

11 1 M3 Anal. Pondasi Batu Kali 1 : 4


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.3.2.1.2)
Upah 1.5000 OH Pekerja Rp. 75,000.00 Rp. 112,500.00
0.0750 OH Mandor Rp. 100,000.00 Rp. 7,500.00
0.7500 OH Tukang Batu Rp. 100,000.00 Rp. 75,000.00
0.0750 OH Kepala Tukang Rp. 150,000.00 Rp. 11,250.00
Bahan 1.2000 M3 Batu Kali Rp. 379,832.90 Rp. 455,799.48
163.00 Kg Semen Portland ( 50 Kg/Zak ) Rp. 1,900.00 Rp. 309,700.00
0.5200 M3 Pasir Pasang Rp. 366,522.90 Rp. 190,591.91
Jumlah Rp. 206,250.00 Rp. 956,091.39 Rp. 1,162,341.39
Overhead 0.1000 Rp. 116,234.14
Jumlah Rp. 1,278,575.53
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,278,500.00

12 1 M3 Anal. Aanstampang Batu Kali


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.3.2.1.9)
Upah 0.7800 OH Pekerja Rp. 75,000.00 Rp. 58,500.00
0.0390 OH Mandor Rp. 100,000.00 Rp. 3,900.00
0.3900 OH Tukang Batu Rp. 100,000.00 Rp. 39,000.00
0.0390 OH Kepala Tukang Rp. 150,000.00 Rp. 5,850.00
Bahan 1.2000 M3 Batu Kali Rp. 379,832.90 Rp. 455,799.48
0.4320 M3 Pasir Urug Rp. 195,500.00 Rp. 84,456.00
Jumlah Rp. 107,250.00 Rp. 540,255.48 Rp. 647,505.48
Overhead 0.1000 Rp. 64,750.55
Jumlah Rp. 712,256.03
Total Harga Satuan Pekerjaan Dibulatkan Rp. 712,200.00

D. ANALISA HARGA SATUAN PEKERJAAN BETON

13 1 M3 Anal. Stamp Beton K 100


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.1)
Upah 1.6500 OH Pekerja Rp. 75,000.00 Rp. 123,750.00
0.0830 OH Mandor Rp. 100,000.00 Rp. 8,300.00
0.2750 OH Tukang Batu Rp. 100,000.00 Rp. 27,500.00
0.0280 OH Kepala Tukang Rp. 150,000.00 Rp. 4,200.00
Bahan 247.00 Kg Sement Portland Rp. 1,900.00 Rp. 469,300.00
0.6207 M3 Pasir Beton Rp. 366,522.90 Rp. 227,506.00
0.7400 M3 Kerikil Beton (Maks. 30 mm) Rp. 415,769.90 Rp. 307,669.73
215.00 Ltr Air Rp. 18.00 Rp. 3,870.00
Jumlah Rp. 163,750.00 Rp. 1,008,345.73 Rp. 1,172,095.73
Overhead 0.1000 Rp. 117,209.57
Jumlah Rp. 1,289,305.30
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,289,300.00

14 1 M3 Anal. Stamp Beton K 125


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.2)
Upah 1.6500 OH Pekerja Rp. 75,000.00 Rp. 123,750.00
0.0830 OH Mandor Rp. 100,000.00 Rp. 8,300.00
0.2750 OH Tukang Batu Rp. 100,000.00 Rp. 27,500.00
0.0280 OH Kepala Tukang Rp. 150,000.00 Rp. 4,200.00
Bahan 276.00 Kg Sement Portland Rp. 1,900.00 Rp. 524,400.00
0.5914 M3 Pasir Beton Rp. 366,522.90 Rp. 216,772.12
0.7496 M3 Kerikil Beton (Maks. 30 mm) Rp. 415,769.90 Rp. 311,673.44
215.00 Ltr Air Rp. 18.00 Rp. 3,870.00
Jumlah Rp. 163,750.00 Rp. 1,056,715.55 Rp. 1,220,465.55
Overhead 0.1000 Rp. 122,046.56
Jumlah Rp. 1,342,512.11
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,342,500.00

15 1 M3 Anal. Stamp Beton K 175 Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.5)
Upah 1.6500 OH Pekerja Rp. 75,000.00 Rp. 123,750.00
0.0830 OH Mandor Rp. 100,000.00 Rp. 8,300.00
0.2750 OH Tukang Batu Rp. 100,000.00 Rp. 27,500.00

! 2 dari 26
0.0280 OH Kepala Tukang Rp. 150,000.00 Rp. 4,200.00
Bahan 326.00 Kg Sement Portland Rp. 1,900.00 Rp. 619,400.00
0.5429 M3 Pasir Beton Rp. 366,522.90 Rp. 198,969.57
0.7622 M3 Kerikil Beton (Maks. 30 mm) Rp. 415,769.90 Rp. 316,909.06
215.00 Ltr Air Rp. 18.00 Rp. 3,870.00
Jumlah Rp. 163,750.00 Rp. 1,139,148.63 Rp. 1,302,898.63
Overhead 0.1000 Rp. 130,289.86
Jumlah Rp. 1,433,188.49
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,433,100.00
16 1 M3 Anal. Stamp Beton K 175 Lt. 2
Upah 1.0900 Upah Stamp Beton Lt. 1 Rp. 163,750.00 Rp. 178,487.50
Bahan 1.0000 Bahan Stamp Beton Lt. 1 Rp. 1,139,148.63 Rp. 1,139,148.63
Jumlah Rp. 178,487.50 Rp. 1,139,148.63 Rp. 1,317,636.13
Overhead 0.1000 Rp. 131,763.61
Jumlah Rp. 1,449,399.74
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,449,300.00

17 1 M3 Anal. Stamp Beton K 175 Lt. 3


Upah 1.1200 Upah Stamp Beton Lt. 1 Rp. 163,750.00 Rp. 183,400.00
Bahan 1.0000 Bahan Stamp Beton Lt. 1 Rp. 1,139,148.63 Rp. 1,139,148.63
Jumlah Rp. 183,400.00 Rp. 1,139,148.63 Rp. 1,322,548.63
Overhead 0.1000 Rp. 132,254.86
Jumlah Rp. 1,454,803.49
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,454,800.00

18 1 M3 Anal. Stamp Beton K-225 Lt. 1


(SNI 7394-2008 - Analisa 6.7)
Upah 1.6500 OH Pekerja Rp. 75,000.00 Rp. 123,750.00
0.0830 OH Mandor Rp. 100,000.00 Rp. 8,300.00
0.2750 OH Tukang Batu Rp. 100,000.00 Rp. 27,500.00
0.0280 OH Kepala Tukang Rp. 150,000.00 Rp. 4,200.00
Bahan 371.0000 Kg Semen Portland ( 50 Kg/Zak ) Rp. 1,900.00 Rp. 704,900.00
0.4986 M3 Pasir Beton Rp. 366,522.90 Rp. 182,737.85
0.7756 M3 Kerikil Beton (Maks. 30 mm) Rp. 415,769.90 Rp. 322,452.66
215.0000 Ltr Air Rp. 18.00 Rp. 3,870.00
Jumlah Rp. 163,750.00 Rp. 1,213,960.50 Rp. 1,377,710.50
Overhead 0.1000 Rp. 137,771.05
Total Harga Satuan Pekerjaan Rp. 1,515,481.55

19 1 M3 Anal. Stamp Beton K 225 Lt. 2


Upah 1.0900 Upah Stamp Beton Lt. 1 Rp. 163,750.00 Rp. 178,487.50
Bahan 1.0000 Bahan Stamp Beton Lt. 1 Rp. 1,213,960.50 Rp. 1,213,960.50
Rp. 178,487.50 Rp. 1,213,960.50 Rp. 1,392,448.00
0.1000 Overhead Rp. 139,244.80
Jumlah + Overhead Rp. 1,531,692.80

20 1 M3 Anal. Stamp Beton K 225 Lt. 3


Upah 1.1200 Upah Stamp Beton Lt. 1 Rp. 163,750.00 Rp. 183,400.00
Bahan 1.0000 Bahan Stamp Beton Lt. 1 Rp. 1,213,960.50 Rp. 1,213,960.50
Jumlah Rp. 183,400.00 Rp. 1,213,960.50 Rp. 1,397,360.50
Overhead 0.1000 Rp. 139,736.05
Total Harga Satuan Pekerjaan Rp. 1,537,096.55

21 1 M3 Anal. Stamp Beton K 225 Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.7)
Upah 1.6500 OH Pekerja Rp. 75,000.00 Rp. 123,750.00
0.0830 OH Mandor Rp. 100,000.00 Rp. 8,300.00
0.2750 OH Tukang Batu Rp. 100,000.00 Rp. 27,500.00
0.0280 OH Kepala Tukang Rp. 150,000.00 Rp. 4,200.00
Bahan 371.00 Kg Sement Portland Rp. 1,900.00 Rp. 704,900.00
0.4986 M3 Pasir Beton Rp. 366,522.90 Rp. 182,737.85
0.7756 M3 Kerikil Beton (Maks. 30 mm) Rp. 415,769.90 Rp. 322,452.66
215.00 Ltr Air Rp. 18.00 Rp. 3,870.00
Jumlah Rp. 163,750.00 Rp. 1,213,960.50 Rp. 1,377,710.50
Overhead 0.1000 Rp. 137,771.05
Jumlah Rp. 1,515,481.55
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,515,400.00

22 1 M3 Anal. Stamp Beton K 225 Lt. 2


Upah 1.0900 Upah Rangka Besi Beton Lt. 2 Rp. 163,750.00 Rp. 178,487.50
Bahan 1.0000 Bahan Rangka Besi Beton Lt. 2 Rp. 1,213,960.50 Rp. 1,213,960.50
Jumlah Rp. 178,487.50 Rp. 1,213,960.50 Rp. 1,392,448.00
Overhead 0.1000 Rp. 139,244.80
Jumlah Rp. 1,531,692.80
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,531,600.00

23 1 M3 Anal. Stamp Beton K 225 Lt. 3


Upah 1.1200 Upah Rangka Besi Beton Lt. 3 Rp. 163,750.00 Rp. 183,400.00
Bahan 1.0000 Bahan Rangka Besi Beton Lt. 3 Rp. 1,213,960.50 Rp. 1,213,960.50
Jumlah Rp. 183,400.00 Rp. 1,213,960.50 Rp. 1,397,360.50
Overhead 0.1000 Rp. 139,736.05
Jumlah Rp. 1,537,096.55
Total Harga Satuan Pekerjaan Jumlah + Overhead Dibulatkan Rp. 1,537,000.00

24 1 M3 Anal. Stamp Beton K 250 (Site Mix)


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.8)
Upah 1.6500 OH Pekerja Rp. 75,000.00 Rp. 123,750.00
0.0830 OH Mandor Rp. 100,000.00 Rp. 8,300.00
0.2750 OH Tukang Batu Rp. 100,000.00 Rp. 27,500.00
0.0280 OH Kepala Tukang Rp. 150,000.00 Rp. 4,200.00
Bahan 384.00 Kg Sement Portland Rp. 1,900.00 Rp. 729,600.00
0.4943 M3 Pasir Beton Rp. 366,522.90 Rp. 181,167.03

! 3 dari 26
0.7696 M3 Kerikil Beton (Maks. 30 mm) Rp. 415,769.90 Rp. 319,988.83
215.00 Ltr Air Rp. 18.00 Rp. 3,870.00
Jumlah Rp. 163,750.00 Rp. 1,234,625.87 Rp. 1,398,375.87
Overhead 0.1000 Rp. 139,837.59
Jumlah Rp. 1,538,213.45
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,538,200.00

25 1 M3 Anal. Stamp Beton K 300 (Site Mix)


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.10)
Upah 1.6500 OH Pekerja Rp. 75,000.00 Rp. 123,750.00
0.0830 OH Mandor Rp. 100,000.00 Rp. 8,300.00
0.2750 OH Tukang Batu Rp. 100,000.00 Rp. 27,500.00
0.0280 OH Kepala Tukang Rp. 150,000.00 Rp. 4,200.00
Bahan 413.00 Kg Sement Portland Rp. 1,900.00 Rp. 784,700.00
0.4864 M3 Pasir Beton Rp. 366,522.90 Rp. 178,287.21
0.7563 M3 Kerikil Beton (Maks. 30 mm) Rp. 415,769.90 Rp. 314,445.24
215.00 Ltr Air Rp. 18.00 Rp. 3,870.00
Jumlah Rp. 163,750.00 Rp. 1,281,302.45 Rp. 1,445,052.45
Overhead 0.1000 Rp. 144,505.24
Jumlah Rp. 1,589,557.69
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,589,500.00

26 1 M3 Anal. Beton Campuran 1 Pc : 3 Ps : 5 Kr


Upah 1.6500 OH Pekerja Rp. 75,000.00 Rp. 123,750.00
0.0800 OH Mandor Rp. 100,000.00 Rp. 8,000.00
0.2500 OH Tukang Batu Rp. 100,000.00 Rp. 25,000.00
0.0250 OH Kepala Tukang Rp. 150,000.00 Rp. 3,750.00
Bahan 218.00 Kg Sement Portland Rp. 1,900.00 Rp. 414,200.00
0.5200 M3 Pasir Beton Rp. 366,522.90 Rp. 190,591.91
0.8700 M3 Kerikil Beton Rp. 415,769.90 Rp. 361,719.81
Jumlah Rp. 160,500.00 Rp. 966,511.72 Rp. 1,127,011.72
Overhead 0.1000 Rp. 112,701.17
Jumlah Rp. 1,239,712.89
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,239,700.00

27 1 M3 Anal. Beton Siklop 60% Beton 1Pc : 2Ps : 3Kr + 40% Batukali
(SNI 7394:2008 – Analisa 6.4)
Upah 2.3800 oh Pekerja Rp. 75,000.00 Rp. 178,500.00
0.3000 oh Tukang Batu Rp. 100,000.00 Rp. 30,000.00
0.0300 oh Kepala Tukang Rp. 150,000.00 Rp. 4,500.00
0.0800 oh Mandor Rp. 100,000.00 Rp. 8,000.00

Bahan 194.0000 kg Semen Portland Rp. 1,900.00 Rp. 368,600.00


0.3120 m³ Pasir Beton Rp. 366,522.90 Rp. 114,355.14
0.4680 m³ Kerikil Beton Rp. 415,769.90 Rp. 194,580.31
0.4500 m³ Batu Kali Rp. 379,832.90 Rp. 170,924.81
Jumlah Rp. 221,000.00 Rp. 848,460.26 Rp. 1,069,460.26
Overhead 0.1000 Rp. 106,946.03
Jumlah Rp. 1,176,406.29
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,176,400.00

28 10 Kg Anal. Pek. Pembesian Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.17)
Upah 0.0700 OH Pekerja Rp. 75,000.00 Rp. 5,250.00
0.0040 OH Mandor Rp. 100,000.00 Rp. 400.00
0.0070 OH Kepala Tukang Rp. 150,000.00 Rp. 1,050.00
0.0700 OH Tukang Besi Rp. 100,000.00 Rp. 7,000.00
Bahan 10.5000 Kg Besi Beton Rp. 17,190.73 Rp. 180,502.67
0.1500 Kg Kawat Beton Rp. 17,324.13 Rp. 2,598.62
Jumlah Rp. 13,700.00 Rp. 183,101.29 Rp. 196,801.29
0.1000 Untuk 1 kg x 0.1 Rp. 19,680.13
Overhead 0.1000 Rp. 1,968.01
Jumlah Rp. 21,648.14
Total Harga Satuan Pekerjaan Jumlah + Overhead Dibulatkan Rp. 21,600.00

29 100 Kg Anal. Pek. Pembesian Lt. 2


Upah 1.0900 Upah Rangka Besi Beton Lt. 1 Rp. 13,700.00 Rp. 14,933.00
Bahan 1.0000 Bahan Rangka Besi Beton Lt. 1 Rp. 183,101.29 Rp. 183,101.29
Jumlah Rp. 14,933.00 Rp. 183,101.29 Rp. 198,034.29
0.1000 Untuk 1 kg x 0.1 Rp. 19,803.43
Overhead 0.1000 Rp. 1,980.34
Jumlah Rp. 21,783.77
Total Harga Satuan Pekerjaan Jumlah + Overhead Dibulatkan Rp. 21,700.00

30 100 Kg Anal. Pek. Pembesian Lt. 3


Upah 1.1200 Upah Rangka Besi Beton Lt. 1 Rp. 13,700.00 Rp. 15,344.00
Bahan 1.0000 Bahan Rangka Besi Beton Lt. 1 Rp. 183,101.29 Rp. 183,101.29
Jumlah Rp. 15,344.00 Rp. 183,101.29 Rp. 198,445.29
0.1000 Untuk 1 kg x 0.1 Rp. 19,844.53
Overhead 0.1000 Rp. 1,984.45
Jumlah Rp. 21,828.98
Total Harga Satuan Pekerjaan Jumlah + Overhead Dibulatkan Rp. 21,800.00

31 10 Kg Anal. Pek. Jaring Kawat Baja (Wiremesh)


(SNI 7394-2008 - Analisa 6.17)
Upah 0.0250 OH Pekerja Rp. 75,000.00 Rp. 1,875.00
0.0010 OH Mandor Rp. 100,000.00 Rp. 100.00
0.0250 OH Kepala Tukang Rp. 150,000.00 Rp. 3,750.00
0.0250 OH Tukang Besi Rp. 100,000.00 Rp. 2,500.00
Bahan 10.2000 Kg Jaring Kawat Baja dilas Rp. 17,190.73 Rp. 175,345.45
0.0500 Kg Kawat Beton Rp. 17,324.13 Rp. 866.21
Jumlah Rp. 8,225.00 Rp. 176,211.65 Rp. 184,436.65

! 4 dari 26
0.1000 Untuk 1 kg x 0.1 Rp. 18,443.67
Overhead 0.1000 Overhead Rp. 1,844.37
Total Harga Satuan Pekerjaan Jumlah + Overhead Rp. 20,288.03

32 1 M2 Anal. Papan Bekisting Untuk Pondasi


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.20)
Upah 0.5200 OH Pekerja Rp. 75,000.00 Rp. 39,000.00
0.2600 OH Tukang Kayu Rp. 100,000.00 Rp. 26,000.00
0.0260 OH Kepala Tukang Rp. 150,000.00 Rp. 3,900.00
0.0260 OH Mandor Rp. 100,000.00 Rp. 2,600.00
Bahan 0.0400 M3 Papan Kayu Bekisting Kelas III Rp. 2,444,300.00 Rp. 97,772.00
0.3000 Kg Paku Rp. 22,627.00 Rp. 6,788.10
0.1000 Ltr Minyak Bekisting Rp. 10,600.00 Rp. 1,060.00
Jumlah Rp. 71,500.00 Rp. 105,620.10 Rp. 177,120.10
0.5000 Untuk 2 x Pakai 1/2 88,560.05
Overhead 0.1000 Rp. 8,856.01
Jumlah Rp. 97,416.06
Total Harga Satuan Pekerjaan Dibulatkan Rp. 97,400.00

33 1 M2 Anal. Papan Bekisting Untuk Sloof


(SNI 7394-2008 - Analisa 6.21)
Upah 0.5200 OH Pekerja Rp. 75,000.00 Rp. 39,000.00
0.2600 OH Tukang Kayu Rp. 100,000.00 Rp. 26,000.00
0.0260 OH Kepala Tukang Rp. 150,000.00 Rp. 3,900.00
0.0260 OH Mandor Rp. 100,000.00 Rp. 2,600.00
Bahan 0.0450 M3 Papan Kayu Bekisting Kelas III Rp. 2,444,300.00 Rp. 109,993.50
0.3000 Kg Paku Rp. 22,627.00 Rp. 6,788.10
0.1000 Ltr Minyak Bekisting Rp. 10,600.00 Rp. 1,060.00
Jumlah Rp. 71,500.00 Rp. 117,841.60 Rp. 189,341.60
Overhead 0.1000 Rp. 18,934.16
Total Harga Satuan Pekerjaan Rp. 208,275.76

34 1 M2 Anal. Bekisting Untuk Kolom Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.22)
Upah 0.6600 OH Pekerja Rp. 75,000.00 Rp. 49,500.00
0.3300 OH Tukang Kayu Rp. 100,000.00 Rp. 33,000.00
0.0330 OH Kepala Tukang Rp. 150,000.00 Rp. 4,950.00
0.0330 OH Mandor Rp. 100,000.00 Rp. 3,300.00
Bahan 0.0400 M3 Papan Kayu Bekisting Kelas III Rp. 2,444,300.00 Rp. 97,772.00
0.4000 Kg Paku Rp. 22,627.00 Rp. 9,050.80
0.2000 Ltr Minyak Bekisting Rp. 10,600.00 Rp. 2,120.00
0.0150 M3 Balok Kayu Kelas II Rp. 2,933,200.00 Rp. 43,998.00
0.3500 Lbr Plywood Tebal 9 mm Rp. 117,800.00 Rp. 41,230.00
2.0000 Btg Dolken Kayu Galam (Ø 8-10) cm L = 4 m Rp. 55,400.00 Rp. 110,800.00
Jumlah Rp. 90,750.00 Rp. 304,970.80 Rp. 395,720.80
0.5000 Untuk 2 x Pakai 1/2 197,860.40
Overhead 0.1000 Rp. 19,786.04
Jumlah Rp. 217,646.44
Total Harga Satuan Pekerjaan Dibulatkan Rp. 217,600.00

35 1 M2 Anal. Bekisting Untuk Kolom Lt. 2


Upah 1.0900 Upah Papan Bekisting Lt. 1 Rp. 90,750.00 Rp. 98,917.50
Bahan 1.0000 Bahan Papan Bekisting Lt. 1 Rp. 304,970.80 Rp. 304,970.80
Jumlah Rp. 98,917.50 Rp. 304,970.80 Rp. 403,888.30
0.5000 Untuk 2 x Pakai 1/2 201,944.15
Overhead 0.1000 Rp. 20,194.42
Jumlah Rp. 222,138.57
Total Harga Satuan Pekerjaan Dibulatkan Rp. 222,100.00

36 1 M2 Anal. Bekisting Untuk Kolom Lt. 3


Upah 1.1200 Upah Papan Bekisting Lt. 1 Rp. 90,750.00 Rp. 101,640.00
Bahan 1.0000 Bahan Papan Bekisting Lt. 1 Rp. 304,970.80 Rp. 304,970.80
Jumlah Rp. 101,640.00 Rp. 304,970.80 Rp. 406,610.80
0.5000 Untuk 2 x Pakai 1/2 203,305.40
Overhead 0.1000 Overhead Rp. 20,330.54
Jumlah Rp. 223,635.94
Total Harga Satuan Pekerjaan Dibulatkan Rp. 223,600.00

37 1 M2 Anal. Bekisting Untuk Balok Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.23)
Upah 0.6600 OH Pekerja Rp. 75,000.00 Rp. 49,500.00
0.3300 OH Tukang Kayu Rp. 100,000.00 Rp. 33,000.00
0.0330 OH Kepala Tukang Rp. 150,000.00 Rp. 4,950.00
0.0330 OH Mandor Rp. 100,000.00 Rp. 3,300.00
Bahan 0.0400 M3 Papan Kayu Bekisting Kelas III Rp. 2,444,300.00 Rp. 97,772.00
0.4000 Kg Paku Rp. 22,627.00 Rp. 9,050.80
0.2000 Ltr Minyak Bekisting Rp. 10,600.00 Rp. 2,120.00
0.0180 M3 Balok Kayu Kelas II Rp. 2,933,200.00 Rp. 52,797.60
0.3500 Lbr Plywood Tebal 9 mm Rp. 117,800.00 Rp. 41,230.00
2.0000 Btg Dolken Kayu Galam (Ø 8-10) cm L = 4 m Rp. 55,400.00 Rp. 110,800.00
Jumlah Rp. 90,750.00 Rp. 313,770.40 Rp. 404,520.40
0.5000 Untuk 2 x Pakai 1/2 202,260.20
Overhead 0.1000 Overhead Rp. 20,226.02
Jumlah Rp. 222,486.22
Total Harga Satuan Pekerjaan Dibulatkan Rp. 222,400.00

38 1 M2 Anal. Bekisting Untuk Balok Lt. 2


Upah 1.0900 Upah Papan Bekisting Lt. 1 Rp. 90,750.00 Rp. 98,917.50
Bahan 1.0000 Bahan Papan Bekisting Lt. 1 Rp. 313,770.40 Rp. 313,770.40
Jumlah Rp. 98,917.50 Rp. 313,770.40 Rp. 412,687.90
0.5000 Untuk 2 x Pakai 1/2 206,343.95
Overhead 0.1000 Overhead Rp. 20,634.40

! 5 dari 26
Jumlah Rp. 226,978.35
Total Harga Satuan Pekerjaan Dibulatkan Rp. 226,900.00

39 1 M2 Anal. Bekisting Untuk Balok Lt. 3


Upah 1.1200 Upah Papan Bekisting Lt. 1 Rp. 90,750.00 Rp. 101,640.00
Bahan 1.0000 Bahan Papan Bekisting Lt. 1 Rp. 313,770.40 Rp. 313,770.40
Jumlah Rp. 101,640.00 Rp. 313,770.40 Rp. 415,410.40
0.5000 Untuk 2 x Pakai 1/2 207,705.20
Overhead 0.1000 Overhead Rp. 20,770.52
Jumlah Rp. 228,475.72
Total Harga Satuan Pekerjaan Dibulatkan Rp. 228,400.00

40 1 M2 Anal. Bekisting Untuk Pelat Lantai Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.1.1.24)
Upah 0.6600 OH Pekerja Rp. 75,000.00 Rp. 49,500.00
0.3300 OH Tukang Kayu Rp. 100,000.00 Rp. 33,000.00
0.0330 OH Kepala Tukang Rp. 150,000.00 Rp. 4,950.00
0.0330 OH Mandor Rp. 100,000.00 Rp. 3,300.00
Bahan 0.0400 M3 Papan Kayu Bekisting Kelas III Rp. 2,444,300.00 Rp. 97,772.00
0.4000 Kg Paku Rp. 22,627.00 Rp. 9,050.80
0.2000 Ltr Minyak Bekisting Rp. 10,600.00 Rp. 2,120.00
0.0150 M3 Balok Kayu Kelas II Rp. 2,933,200.00 Rp. 43,998.00
0.3500 Lbr Plywood Tebal 9 mm Rp. 117,800.00 Rp. 41,230.00
6.0000 Btg Dolken Kayu Galam (Ø 8-10) cm L = 4 m Rp. 55,400.00 Rp. 332,400.00
Jumlah Rp. 90,750.00 Rp. 526,570.80 Rp. 617,320.80
0.5000 Untuk 2 x Pakai 1/2 Rp. 308,660.40
Overhead 0.1000 Overhead Rp. 30,866.04
Jumlah Rp. 339,526.44
Total Harga Satuan Pekerjaan Dibulatkan Rp. 339,500.00

41 1 M2 Anal. Bekisting Untuk Pelat Lantai Lt. 3


Upah 1.1200 Upah Papan Bekisting Lt. 3 Rp. 90,750.00 Rp. 101,640.00
Bahan 1.0000 Bahan Papan Bekisting Lt. 3 Rp. 526,570.80 Rp. 526,570.80
Jumlah Rp. 101,640.00 Rp. 526,570.80 Rp. 628,210.80
0.5000 Untuk 2 x Pakai 1/2 314,105.40
Overhead 0.1000 Overhead Rp. 31,410.54
Jumlah Rp. 345,515.94
Total Harga Satuan Pekerjaan Dibulatkan Rp. 345,500.00

E. ANALISA HARGA SATUAN PEKERJAAN DINDING DAN PLESTERAN

42 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 2 Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.1.7)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
0.1000 OH Tukang Batu Rp. 100,000.00 Rp. 10,000.00
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
Bahan 70.0000 Bh Batu Bata 5x11x22 Rp. 1,980.00 Rp. 138,600.00
18.9500 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 36,005.00
0.0380 M3 Pasir Pasang Rp. 366,522.90 Rp. 13,927.87
Jumlah Rp. 35,500.00 Rp. 188,532.87 Rp. 224,032.87
Overhead 0.1000 Rp. 22,403.29
Jumlah Rp. 246,436.16
Total Harga Satuan Pekerjaan Dibulatkan Rp. 246,400.00

43 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 2 Lt. 2


Upah 1.0900 Upah Pasangan Bata Lt. 1 Rp. 35,500.00 Rp. 38,695.00
Bahan 1.0000 Bahan Pasangan Bata Lt. 1 Rp. 188,532.87 Rp. 188,532.87
Jumlah Rp. 38,695.00 188,532.87 Rp. 227,227.87
Overhead 0.1000 Rp. 22,722.79
Jumlah Rp. 249,950.66
Total Harga Satuan Pekerjaan Dibulatkan Rp. 249,900.00

44 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 2 Lt. 3


Upah 1.1200 Upah Pasangan Bata Lt. 1 Rp. 35,500.00 Rp. 39,760.00
Bahan 1.0000 Bahan Pasangan Bata Lt. 1 Rp. 188,532.87 Rp. 188,532.87
Jumlah Rp. 39,760.00 Rp. 188,532.87 Rp. 228,292.87
Overhead 0.1000 Rp. 22,829.29
Jumlah Rp. 251,122.16
Total Harga Satuan Pekerjaan Dibulatkan Rp. 251,100.00

45 1 M3 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 3


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.1.8)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
0.1000 OH Tukang Batu Rp. 100,000.00 Rp. 10,000.00
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
Bahan 70.0000 Bh Batu Bata Rp. 1,980.00 Rp. 138,600.00
14.3700 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 27,303.00
0.0400 M3 Pasir Pasang Rp. 366,522.90 Rp. 14,660.92
Jumlah Rp. 35,500.00 Rp. 180,563.92 Rp. 216,063.92
Overhead 0.1000 Rp. 21,606.39
Jumlah Rp. 237,670.31
Total Harga Satuan Pekerjaan Dibulatkan Rp. 237,600.00

46 1 M3 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 4 Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.1.8)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
0.1000 OH Tukang Batu Rp. 100,000.00 Rp. 10,000.00
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
Bahan 70.0000 Bh Batu Bata Rp. 1,980.00 Rp. 138,600.00

! 6 dari 26
11.5000 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 21,850.00
0.0430 M3 Pasir Pasang Rp. 366,522.90 Rp. 15,760.48
Jumlah Rp. 35,500.00 Rp. 176,210.48 Rp. 211,710.48
Overhead 0.1000 Rp. 21,171.05
Jumlah Rp. 232,881.53
Total Harga Satuan Pekerjaan Dibulatkan Rp. 232,800.00

47 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 4 Lt. 2


Upah 1.0900 Upah Pasangan Bata Lt. 1 Rp. 35,500.00 Rp. 38,695.00
Bahan 1.0000 Bahan Pasangan Bata Lt. 1 Rp. 176,210.48 Rp. 176,210.48
Jumlah Rp. 38,695.00 Rp. 176,210.48 Rp. 214,905.48
Overhead 0.1000 Rp. 21,490.55
Jumlah Rp. 236,396.03
Total Harga Satuan Pekerjaan Dibulatkan Rp. 236,300.00
48 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 4 Lt. 3
Upah 1.1200 Upah Pasangan Bata Lt. 1 Rp. 35,500.00 Rp. 39,760.00
Bahan 1.0000 Bahan Pasangan Bata Lt. 1 Rp. 176,210.48 Rp. 176,210.48
Jumlah Rp. 39,760.00 Rp. 176,210.48 Rp. 215,970.48
Overhead 0.1000 Rp. 21,597.05
Jumlah Rp. 237,567.53
Total Harga Satuan Pekerjaan Dibulatkan Rp. 237,500.00

49 1 M2 Anal. Memasang Dinding Terawang (Rooster) Uk. 20x20x10 cm Campuran Spesi 1 : 3 Lt. 1
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.1.22)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
0.1000 OH Tukang Batu Rp. 100,000.00 Rp. 10,000.00
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
Bahan 24.0000 Buah Rooster R-11 Uk. 20x20x10 cm Rp. 24,200.00 Rp. 580,800.00
11.0000 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 20,900.00
0.0350 M3 Pasir Pasang Rp. 366,522.90 Rp. 12,828.30
Jumlah Rp. 35,500.00 Rp. 614,528.30 Rp. 650,028.30
Overhead 0.1000 Rp. 65,002.83
Jumlah Rp. 715,031.13
Total Harga Satuan Pekerjaan Dibulatkan Rp. 715,000.00

50 1 M2 Anal. Memasang Dinding Terawang (Rooster) Uk. 20x20x10 cm Campuran Spesi 1 : 3 Lt. 2
Upah 1.0900 Upah Memasang Batu Kerawang Lt. 2 Lt. 1 Rp. 35,500.00 Rp. 38,695.00
Bahan 1.0000 Bahan Memasang Batu Kerawang Lt. 1 Rp. 614,528.30 Rp. 614,528.30
Jumlah Rp. 38,695.00 Rp. 614,528.30 Rp. 653,223.30
Overhead 0.1000 Rp. 65,322.33
Jumlah Rp. 718,545.63
Total Harga Satuan Pekerjaan Dibulatkan Rp. 718,500.00

51 1 M2 Anal. Plesteran 1 : 1 Tebal 15 mm (Afwerking Beton) Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.2.1)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
0.1500 OH Tukang Batu Rp. 100,000.00 Rp. 15,000.00
0.0150 OH Kepala Tukang Rp. 150,000.00 Rp. 2,250.00
Bahan 15.5040 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 29,457.60
0.0160 M3 Pasir Pasang Rp. 366,522.90 Rp. 5,864.37
Jumlah Rp. 41,250.00 Rp. 35,321.97 Rp. 76,571.97
Overhead 0.1000 Rp. 7,657.20
Jumlah Rp. 84,229.16
Total Harga Satuan Pekerjaan Dibulatkan Rp. 84,200.00

52 1 M2 Anal. Plesteran 1 : 1 Tebal 15 mm (Afwerking Beton) Lt. 2


Upah 1.0900 Upah Afwerking Lt. 1 Rp. 41,250.00 Rp. 44,962.50
Bahan 1.0000 Bahan Afwerking Lt. 1 Rp. 35,321.97 Rp. 35,321.97
Jumlah Rp. 44,962.50 Rp. 35,321.97 Rp. 80,284.47
Overhead 0.1000 Rp. 8,028.45
Jumlah Rp. 88,312.91
Total Harga Satuan Pekerjaan Dibulatkan Rp. 88,300.00

53 1 M2 Anal. Plesteran 1 : 1 Tebal 15 mm (Afwerking Beton) Lt. 3


Upah 1.1200 Upah Afwerking Lt. 1 Rp. 41,250.00 Rp. 46,200.00
Bahan 1.0000 Bahan Afwerking L. 1 Rp. 35,321.97 Rp. 35,321.97
Jumlah Rp. 46,200.00 Rp. 35,321.97 Rp. 81,521.97
Overhead 0.1000 Rp. 8,152.20
Jumlah Rp. 89,674.16
Total Harga Satuan Pekerjaan Dibulatkan Rp. 89,600.00

54 1 M2 Anal. Plesteran 1 : 2 Tebal 15 mm Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.2.2)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
0.1500 OH Tukang Batu Rp. 100,000.00 Rp. 15,000.00
0.0150 OH Kepala Tukang Rp. 150,000.00 Rp. 2,250.00
Bahan 10.2240 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 19,425.60
0.0200 M3 Pasir Pasang Rp. 366,522.90 Rp. 7,330.46
Jumlah Rp. 39,000.00 Rp. 29,006.06 Rp. 68,006.06
Overhead 0.1000 Rp. 6,800.61
Jumlah Rp. 74,806.66
Total Harga Satuan Pekerjaan Dibulatkan Rp. 74,800.00

55 1 M2 Anal. Plesteran 1 : 2 Tebal 15 mm Lt. 2


Upah 1.0900 Upah Plesteran Lt. 1 Rp. 39,000.00 Rp. 42,510.00
Bahan 1.0000 Bahan Plesteran Lt. 1 Rp. 29,006.06 Rp. 29,006.06
Jumlah Rp. 42,510.00 Rp. 29,006.06 Rp. 71,516.06
Overhead 0.1000 Rp. 7,151.61
Total Harga Satuan Pekerjaan Rp. 78,667.66

! 7 dari 26
56 1 M2 Anal. Plesteran 1 : 2 Tebal 15 mm Lt. 3
Upah 1.1200 Upah Plesteran Lt. 1 Rp. 39,000.00 Rp. 43,680.00
Bahan 1.0000 Bahan Plesteran Lt. 1 Rp. 29,006.06 Rp. 29,006.06
Jumlah Rp. 43,680.00 Rp. 29,006.06 Rp. 72,686.06
Overhead 0.1000 Rp. 7,268.61
Jumlah Rp. 79,954.66
Total Harga Satuan Pekerjaan Dibulatkan Rp. 79,900.00

57 1 M2 Anal. Plesteran 1 : 3 Tebal 15 mm


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.2.3)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
0.1500 OH Tukang Batu Rp. 100,000.00 Rp. 15,000.00
0.0150 OH Kepala Tukang Rp. 150,000.00 Rp. 2,250.00
Bahan 7.7760 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 14,774.40
0.0230 M3 Pasir Pasang Rp. 366,522.90 Rp. 8,430.03
Jumlah Rp. 41,250.00 Rp. 23,204.43 Rp. 64,454.43
Overhead 0.1000 Rp. 6,445.44
Jumlah Rp. 70,899.87
Total Harga Satuan Pekerjaan Dibulatkan Rp. 70,800.00

58 1 M2 Anal. Plesteran 1 : 4 Tebal 15 mm Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.2.4)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
0.1500 OH Tukang Batu Rp. 100,000.00 Rp. 15,000.00
0.0150 OH Kepala Tukang Rp. 150,000.00 Rp. 2,250.00
Bahan 6.2400 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 11,856.00
0.0240 M3 Pasir Pasang Rp. 366,522.90 Rp. 8,796.55
Jumlah Rp. 41,250.00 Rp. 20,652.55 Rp. 61,902.55
Overhead 0.1000 Rp. 6,190.25
Jumlah Rp. 68,092.80
Total Harga Satuan Pekerjaan Dibulatkan Rp. 68,000.00

59 1 M2 Anal. Plesteran 1 : 4 Tebal 15 mm Lt. 2


Upah 1.0900 Upah Plesteran Lt. 1 Rp. 41,250.00 Rp. 44,962.50
Bahan 1.0000 Bahan Plesteran Lt. 1 Rp. 20,652.55 Rp. 20,652.55
Jumlah Rp. 44,962.50 Rp. 20,652.55 Rp. 65,615.05
Overhead 0.1000 Rp. 6,561.50
Jumlah Rp. 72,176.55
Total Harga Satuan Pekerjaan Dibulatkan Rp. 72,100.00

60 1 M2 Anal. Plesteran 1 : 4 Tebal 15 mm Lt. 3


Upah 1.1200 Upah Plesteran Lt. 1 Rp. 41,250.00 Rp. 46,200.00
Bahan 1.0000 Bahan Plesteran Lt. 1 Rp. 20,652.55 Rp. 20,652.55
Jumlah Rp. 46,200.00 Rp. 20,652.55 Rp. 66,852.55
Overhead 0.1000 Rp. 6,685.25
Jumlah Rp. 73,537.80
Total Harga Satuan Pekerjaan Dibulatkan Rp. 73,500.00

61 1 M2 Anal. Plesteran Granit, 1 : 2 Granit, Tebal 10 cm


(SNI 2837-2008 - Analisa 6.21)
Upah 0.4500 OH Pekerja Rp. 75,000.00 Rp. 33,750.00
0.0230 OH Mandor Rp. 100,000.00 Rp. 2,300.00
0.2250 OH Tukang Batu Rp. 100,000.00 Rp. 22,500.00
0.0230 OH Kepala Tukang Rp. 150,000.00 Rp. 3,450.00
Bahan 10.0000 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 19,000.00
15.0000 Kg Batu Granit Rp. 7,450.00 Rp. 111,750.00
Jumlah Rp. 62,000.00 Rp. 130,750.00 Rp. 192,750.00
Overhead 0.1000 Rp. 19,275.00
Total Harga Satuan Pekerjaan Rp. 212,025.00

62 1 M2 Anal. Finishing Siar Pasangan Batu Kali Adukan 1 : 2


(SNI 2837-2008 - Analisa 6.26)
Upah 0.3000 OH Pekerja Rp. 75,000.00 Rp. 22,500.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
0.1500 OH Tukang Batu Rp. 100,000.00 Rp. 15,000.00
0.0150 OH Kepala Tukang Rp. 150,000.00 Rp. 2,250.00
Bahan 6.3400 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 12,046.00
0.0120 M3 Pasir Pasang Rp. 366,522.90 Rp. 4,398.27
Jumlah Rp. 41,250.00 Rp. 16,444.27 Rp. 57,694.27
Overhead 0.1000 Rp. 5,769.43
Total Harga Satuan Pekerjaan Rp. 63,463.70

63 1 M2 Anal. Acian Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.2.27)
Upah 0.2000 OH Pekerja Rp. 75,000.00 Rp. 15,000.00
0.0100 OH Mandor Rp. 100,000.00 Rp. 1,000.00
0.1000 OH Tukang Batu Rp. 100,000.00 Rp. 10,000.00
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
Bahan 3.2500 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 6,175.00
Jumlah Rp. 27,500.00 Rp. 6,175.00 Rp. 33,675.00
Overhead 0.1000 Rp. 3,367.50
Jumlah Rp. 37,042.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 37,000.00

F. ANALISA HARGA SATUAN PEKERJAAN UKIRAN DAN SUN SHIDING

64 1 M2 Anal. Pemasangan Ornamen Ukiran


Upah 1.0000 Lot Upah Pasang Rp. 100,000.00 Rp. 100,000.00
Bahan 1.0000 M2 Ornamen Motif GRC Rp. 1,000,000.00 Rp. 1,000,000.00

! 8 dari 26
1.0000 M2 Pengecatan Rp. 44,600.00 Rp. 44,600.00
Jumlah Rp. 100,000.00 Rp. 1,044,600.00 Rp. 1,144,600.00
Overhead 0.1000 Rp. 114,460.00
Jumlah Rp. 1,259,060.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,259,000.00

65 1 M2 Anal. Pemasangan Ornamen Sun Shiding


Upah 1.0000 Lot Upah Pasang Rp. 100,000.00 Rp. 100,000.00
Bahan 1.0000 M2 Ornamen Sun Shiding (GRC) Rp. 1,000,000.00 Rp. 1,000,000.00
1.0000 M2 Rangka Besi Rp. 90,000.00 Rp. 90,000.00
1.0000 M2 Pengecatan Rp. 44,600.00 Rp. 44,600.00
Jumlah Rp. 100,000.00 Rp. 1,134,600.00 Rp. 1,234,600.00
Overhead 0.1000 Rp. 123,460.00
Jumlah Rp. 1,358,060.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,358,000.00

G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

66 1 M2 Anal. Pasangan Homogeneous Tile Polished 60x60 Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.3.9')
Upah 0.2500 OH Pekerja Rp. 75,000.00 Rp. 18,750.00
0.0130 OH Mandor Rp. 100,000.00 Rp. 1,300.00
0.1250 OH Tukang Batu Rp. 100,000.00 Rp. 12,500.00
0.0130 OH Kepala Tukang Rp. 150,000.00 Rp. 1,950.00
Bahan 2.7778 Buah Homogeneous Tile Polished 60x60 Rp. 88,000.00 Rp. 244,444.44
9.8000 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 18,620.00
0.0450 M3 Pasir Pasang Rp. 366,522.90 Rp. 16,493.53
1.3000 Kg Semen Warna/Tepung Apha Rp. 13,200.00 Rp. 17,160.00
Jumlah Rp. 34,500.00 Rp. 296,717.97 Rp. 331,217.97
Overhead 0.1000 Rp. 33,121.80
Jumlah Rp. 364,339.77
Total Harga Satuan Pekerjaan Dibulatkan Rp. 364,300.00

67 1 M2 Anal. Pasangan Homogeneous Tile Polished 60x60 Lt. 2


Upah 1.0900 Upah Pas. Homogeneous Tile Polished 60x60 Lt. 1 Rp. 34,500.00 Rp. 37,605.00
Bahan 1.0000 Bahan Pas. Homogeneous Tile Polished 60x60 Lt. 1 Rp. 296,717.97 Rp. 296,717.97
Jumlah Rp. 37,605.00 296,717.97 Rp. 334,322.97
Overhead 0.1000 Rp. 33,432.30
Jumlah Rp. 367,755.27
Total Harga Satuan Pekerjaan Dibulatkan Rp. 367,700.00

68 1 M2 Anal. Pasangan Homogeneous Tile Polished 60x60 Lt. 3


Upah 1.1200 Upah Pas. Homogeneous Tile Polished 60x60 Lt. 1 Rp. 37,605.00 Rp. 42,117.60
Bahan 1.0000 Bahan Pas. Homogeneous Tile Polished 60x60 Lt. 1 Rp. 296,717.97 Rp. 296,717.97
Jumlah Rp. 42,117.60 296,717.97 Rp. 338,835.57
Overhead 0.1000 Rp. 33,883.56
Jumlah Rp. 372,719.13
Total Harga Satuan Pekerjaan Dibulatkan Rp. 372,700.00

69 1 M2 Anal. Pasangan Homogeneous Tile Un Polished 60x60 Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.3.9')
Upah 0.2500 OH Pekerja Rp. 75,000.00 Rp. 18,750.00
0.0130 OH Mandor Rp. 100,000.00 Rp. 1,300.00
0.1250 OH Tukang Batu Rp. 100,000.00 Rp. 12,500.00
0.0130 OH Kepala Tukang Rp. 150,000.00 Rp. 1,950.00
Bahan 2.7778 Buah Homogeneous Tile Un Polished 60x60 Rp. 77,370.00 Rp. 214,916.67
9.8000 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 18,620.00
0.0450 M3 Pasir Pasang Rp. 366,522.90 Rp. 16,493.53
1.3000 Kg Semen Warna/Tepung Apha Rp. 13,200.00 Rp. 17,160.00
Jumlah Rp. 34,500.00 Rp. 267,190.20 Rp. 301,690.20
Overhead 0.1000 Rp. 30,169.02
Jumlah Rp. 331,859.22
Total Harga Satuan Pekerjaan Dibulatkan Rp. 331,800.00

70 1 M2 Anal. Pasangan Homogeneous Tile Un Polished 60x60 Lt. 2


Upah 1.0900 Upah Pas. Homogeneous Tile Un Polished 60x60 Lt. 1 Rp. 34,500.00 Rp. 37,605.00
Bahan 1.0000 Bahan Pas. Homogeneous Tile Un Polished 60x60 Lt. 1 Rp. 267,190.20 Rp. 267,190.20
Jumlah Rp. 37,605.00 267,190.20 Rp. 304,795.20
Overhead 0.1000 Rp. 30,479.52
Jumlah Rp. 335,274.72
Total Harga Satuan Pekerjaan Dibulatkan Rp. 335,200.00

71 1 M2 Anal. Pasangan Homogeneous Tile Un Polished 60x60 Lt. 3


Upah 1.1200 Upah Pas. Homogeneous Tile Un Polished 60x60 Lt. 1 Rp. 37,605.00 Rp. 42,117.60
Bahan 1.0000 Bahan Pas. Homogeneous Tile Un Polished 60x60 Lt. 1 Rp. 267,190.20 Rp. 267,190.20
Jumlah Rp. 42,117.60 267,190.20 Rp. 309,307.80
Overhead 0.1000 Rp. 30,930.78
Jumlah Rp. 340,238.58
Total Harga Satuan Pekerjaan Dibulatkan Rp. 340,200.00

72 1 M2 Anal. Pasangan Ceramik Tile Un Polished 25x25 Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.3.34')
Upah 0.7000 OH Pekerja Rp. 75,000.00 Rp. 52,500.00
0.0350 OH Mandor Rp. 100,000.00 Rp. 3,500.00
0.3500 OH Tukang Batu Rp. 100,000.00 Rp. 35,000.00
0.0350 OH Kepala Tukang Rp. 150,000.00 Rp. 5,250.00
Bahan 6.2500 Buah Keramik Un Polished 25x25 Rp. 18,670.00 Rp. 116,687.50
8.1900 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 15,561.00
0.0450 M3 Pasir Pasang Rp. 366,522.90 Rp. 16,493.53
1.6200 M3 Semen Warna/Tepung Apha Rp. 13,200.00 Rp. 21,384.00
Jumlah Rp. 96,250.00 Rp. 170,126.03 Rp. 266,376.03
Overhead 0.1000 Rp. 26,637.60

! 9 dari 26
Jumlah Rp. 293,013.63
Total Harga Satuan Pekerjaan Dibulatkan Rp. 293,000.00

73 1 M2 Anal. Pasangan Ceramic Tile Un Polished 25x25 Lt. 2


Upah 1.0900 Upah Pasangan Keramik Un Polished 40x40 Lt. 1 Rp. 96,250.00 Rp. 104,912.50
Bahan 1.0000 Bahan Pasangan Keramik Un Polished 40x40 Lt. 1 Rp. 170,126.03 Rp. 170,126.03
Jumlah Rp. 104,912.50 Rp. 170,126.03 Rp. 275,038.53
Overhead 0.1000 Rp. 27,503.85
Jumlah Rp. 302,542.38
Total Harga Satuan Pekerjaan Dibulatkan Rp. 302,500.00

74 1 M2 Anal. Pasangan Ceramic Tile Un Polished 25x25 Lt. 3


Upah 1.1200 Upah Pasangan Keramik Un Polished 40x40 Lt. 1 Rp. 104,912.50 Rp. 117,502.00
Bahan 1.0000 Bahan Pasangan Keramik Un Polished 40x40 Lt. 1 Rp. 170,126.03 Rp. 170,126.03
Jumlah Rp. 117,502.00 Rp. 170,126.03 Rp. 287,628.03
Overhead 0.1000 Rp. 28,762.80
Jumlah Rp. 316,390.83
Total Harga Satuan Pekerjaan Dibulatkan Rp. 316,300.00

75 1 M2 Anal. Pasangan Keramik Un Polished 30x30 Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.3.35)
Upah 0.7000 OH Pekerja Rp. 75,000.00 Rp. 52,500.00
0.0350 OH Mandor Rp. 100,000.00 Rp. 3,500.00
0.3500 OH Tukang Batu Rp. 100,000.00 Rp. 35,000.00
0.0350 OH Kepala Tukang Rp. 150,000.00 Rp. 5,250.00
Bahan 11.8700 Buah Keramik Un Polished 30x30 Rp. 8,280.00 Rp. 98,283.60
10.0000 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 19,000.00
0.0450 M3 Pasir Pasang Rp. 366,522.90 Rp. 16,493.53
1.5000 M3 Semen Warna/Tepung Apha Rp. 13,200.00 Rp. 19,800.00
Jumlah Rp. 96,250.00 Rp. 153,577.13 Rp. 249,827.13
Overhead 0.1000 Rp. 24,982.71
Jumlah Rp. 274,809.84
Total Harga Satuan Pekerjaan Dibulatkan Rp. 274,800.00

76 1 M2 Anal. Pas. Dinding Keramik Toilet 25x40 cm Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.3.54')
Upah 0.9000 OH Pekerja Rp. 75,000.00 Rp. 67,500.00
0.0450 OH Mandor Rp. 100,000.00 Rp. 4,500.00
0.4500 OH Tukang Batu Rp. 100,000.00 Rp. 45,000.00
0.0450 OH Kepala Tukang Rp. 150,000.00 Rp. 6,750.00
Bahan 12.5000 Buah Keramik 20x40 cm Rp. 7,500.00 Rp. 93,750.00
9.3000 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 17,670.00
0.0180 M3 Pasir Pasang Rp. 366,522.90 Rp. 6,597.41
1.9400 Kg Semen Warna/Tepung Apha Rp. 13,200.00 Rp. 25,608.00
Jumlah Rp. 123,750.00 Rp. 143,625.41 Rp. 267,375.41
Overhead 0.1000 Rp. 26,737.54
Jumlah Rp. 294,112.95
Total Harga Satuan Pekerjaan Dibulatkan Rp. 294,100.00

77 1 M2 Anal. Pas. Dinding Keramik Toilet 25x40 cm Lt. 2


Upah 1.0900 Upah Pasangan Keramik 25x40 cm Lt. 1 Rp. 123,750.00 Rp. 134,887.50
Bahan 1.0000 Bahan Pasangan Keramik 25x40 cm Lt. 1 Rp. 143,625.41 Rp. 143,625.41
Jumlah Rp. 134,887.50 Rp. 143,625.41 Rp. 278,512.91
Overhead 0.1000 Rp. 27,851.29
Jumlah Rp. 306,364.20
Total Harga Satuan Pekerjaan Dibulatkan Rp. 306,300.00

78 1 M2 Anal. Pas. Dinding Keramik Toilet 25x40 cm Lt. 3


Upah 1.1200 Upah Pasangan Keramik 25x40 cm Lt. 1 Rp. 134,887.50 Rp. 151,074.00
Bahan 1.0000 Bahan Pasangan Keramik 25x40 cm Lt. 1 Rp. 143,625.41 Rp. 143,625.41
Jumlah Rp. 151,074.00 Rp. 143,625.41 Rp. 294,699.41
Overhead 0.1000 Rp. 29,469.94
Jumlah Rp. 324,169.35
Total Harga Satuan Pekerjaan Dibulatkan Rp. 324,100.00

79 1 M' Anal. Plint Granit Uk. 10 x 60 cm Lt. 1


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.3.24')
Upah 0.0900 OH Pekerja Rp. 75,000.00 Rp. 6,750.00
0.0050 OH Mandor Rp. 100,000.00 Rp. 500.00
0.0900 OH Tukang Batu Rp. 100,000.00 Rp. 9,000.00
0.0090 OH Kepala Tukang Rp. 150,000.00 Rp. 1,350.00
Bahan 1.6667 Buah Plint Granit 10 x 60 Rp. 14,670.00 Rp. 24,450.00
1.1400 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 2,166.00
0.0030 M3 Pasir Pasang Rp. 366,522.90 Rp. 1,099.57
0.1000 M3 Semen Warna/Tepung Apha Rp. 13,200.00 Rp. 1,320.00
Jumlah Rp. 17,600.00 Rp. 29,035.57 Rp. 46,635.57
Overhead 0.1000 Rp. 4,663.56
Jumlah Rp. 51,299.13
Total Harga Satuan Pekerjaan Dibulatkan Rp. 51,200.00

80 1 M' Anal. Plint Granit Uk. 10 x 60 cm Lt. 2


Upah 1.0900 Upah Pasangan Plint Granit Uk. 10 x 60 cm Lt. 1 Rp. 17,600.00 Rp. 19,184.00
Bahan 1.0000 Bahan Pasangan Plint Granit Uk. 10 x 60 cm Lt. 1 Rp. 29,035.57 Rp. 29,035.57
Jumlah Rp. 19,184.00 29,035.57 Rp. 48,219.57
Overhead 0.1000 Rp. 4,821.96
Jumlah Rp. 53,041.53
Total Harga Satuan Pekerjaan Dibulatkan Rp. 53,000.00

81 1 M' Anal. Plint Granit Uk. 10 x 60 cm Lt. 3


Upah 1.1200 Upah Pasangan Plint Granit Uk. 10 x 60 cm Lt. 1 Rp. 19,184.00 Rp. 21,486.08
Bahan 1.0000 Bahan Pasangan Plint Granit Uk. 10 x 60 cm Lt. 1 Rp. 29,035.57 Rp. 29,035.57
Jumlah Rp. 21,486.08 29,035.57 Rp. 50,521.65

! 10 dari 26
Overhead 0.1000 Rp. 5,052.16
Jumlah Rp. 55,573.81
Total Harga Satuan Pekerjaan Dibulatkan Rp. 55,500.00

82 1 M2 Anal. Memasang Batu Andesit Polos Bakar Uk. 15 x 30 x 1.5 cm


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.3.58)
Upah 0.7000 OH Pekerja Rp. 75,000.00 Rp. 52,500.00
0.0350 OH Mandor Rp. 100,000.00 Rp. 3,500.00
0.3500 OH Tukang Batu Rp. 100,000.00 Rp. 35,000.00
0.0350 OH Kepala Tukang Rp. 150,000.00 Rp. 5,250.00
Bahan 1.1000 M2 Batu Andesit Polos Uk. 15x30x1,5 cm Rp. 145,000.00 Rp. 159,500.00
11.7500 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 22,325.00
0.0350 M3 Pasir Pasang Rp. 366,522.90 Rp. 12,828.30
Jumlah Rp. 96,250.00 Rp. 194,653.30 Rp. 290,903.30
Overhead 0.1000 Rp. 29,090.33
Jumlah Rp. 319,993.63
Total Harga Satuan Pekerjaan Dibulatkan Rp. 319,900.00

83 1 M2 Anal. Memasang Batu Alam W.K Cirebon Uk. 20x40x1,5 cm


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.3.58)
Upah 0.7000 OH Pekerja Rp. 75,000.00 Rp. 52,500.00
0.0350 OH Mandor Rp. 100,000.00 Rp. 3,500.00
0.3500 OH Tukang Batu Rp. 100,000.00 Rp. 35,000.00
0.0350 OH Kepala Tukang Rp. 150,000.00 Rp. 5,250.00
Bahan 1.1000 M2 Batu Alam W.K Cirebon Uk. 20x40x1,5 cm Rp. 200,000.00 Rp. 220,000.00
11.7500 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 22,325.00
0.0350 M3 Pasir Pasang Rp. 366,522.90 Rp. 12,828.30
Jumlah Rp. 96,250.00 Rp. 255,153.30 Rp. 351,403.30
Overhead 0.1000 Rp. 35,140.33
Jumlah Rp. 386,543.63
Total Harga Satuan Pekerjaan Dibulatkan Rp. 386,500.00

84 1 M2 Anal. Memasang Batu Pecah/ Lempeng


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.3.58')
Upah 0.7000 OH Pekerja Rp. 75,000.00 Rp. 52,500.00
0.0350 OH Mandor Rp. 100,000.00 Rp. 3,500.00
0.3500 OH Tukang Batu Rp. 100,000.00 Rp. 35,000.00
0.0350 OH Kepala Tukang Rp. 150,000.00 Rp. 5,250.00
Bahan 1.1000 Buah Batu Pecah/ Lempeng Rp. 70,000.00 Rp. 77,000.00
11.7500 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 22,325.00
0.0350 M3 Pasir Pasang Rp. 366,522.90 Rp. 12,828.30
Jumlah Rp. 96,250.00 Rp. 112,153.30 Rp. 208,403.30
Overhead 0.1000 Rp. 20,840.33
Jumlah Rp. 229,243.63
Total Harga Satuan Pekerjaan Dibulatkan Rp. 229,200.00

85 1 M' Anal. Stair Nosing Granit 10x60 cm -0


Upah 0.0900 OH Pekerja Rp. 75,000.00 Rp. 6,750.00
0.0050 OH Mandor Rp. 100,000.00 Rp. 500.00
0.0900 OH Tukang Batu Rp. 100,000.00 Rp. 9,000.00
0.0090 OH Kepala Tukang Rp. 150,000.00 Rp. 1,350.00
Bahan 1.6667 Buah Stair Nosing Granit 10x60 cm Rp. 27,500.00 Rp. 45,833.33
1.1400 Kg Semen Portland (50 Kg/Zak) Rp. 1,900.00 Rp. 2,166.00
0.0030 M3 Pasir Pasang Rp. 366,522.90 Rp. 1,099.57
0.1000 M3 Semen Warna/Tepung Apha Rp. 13,200.00 Rp. 1,320.00
Jumlah Rp. 17,600.00 Rp. 50,418.90 Rp. 68,018.90
Overhead 0.1000 Rp. 6,801.89
Total Harga Satuan Pekerjaan Rp. 74,820.79

86 1 M2 Anal. Pekerjaan Waterproofing Sheet (Toilet Area)


Upah 0.0550 OH Pekerja Rp. 75,000.00 Rp. 4,125.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
1.1000 M2 Waterproofing Sheet Rp. 54,000.00 Rp. 59,400.00
Jumlah Rp. 5,625.00 59,400.00 Rp. 65,025.00
Overhead 0.1000 Rp. 6,502.50
Jumlah Rp. 71,527.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 71,500.00

87 1 M2 Anal. Pekerjaan Waterproofing Sheet (Dak Beton) / System Membran Sheet


Upah 0.0550 OH Pekerja Rp. 75,000.00 Rp. 4,125.00
0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
1.1000 M2 Waterproofing Membran Sheet Rp. 115,000.00 Rp. 126,500.00
1.0000 Ls Alat Bantu Rp. 2,000.00 Rp. 2,000.00
1.0000 M2 Screed Rp. 70,800.00 Rp. 70,800.00
Jumlah Rp. 5,625.00 199,300.00 Rp. 204,925.00
Overhead 0.1000 Rp. 20,492.50
Jumlah Rp. 225,417.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 225,400.00

88 1 M2 Anal. Pasangan Floor Hardener


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.4.3.61)
Upah 0.1200 OH Pekerja Rp. 75,000.00 Rp. 9,000.00
0.1200 OH Tukang Batu Rp. 100,000.00 Rp. 12,000.00
0.0060 OH Mandor Rp. 100,000.00 Rp. 600.00
0.0120 OH Kepala Tukang Rp. 150,000.00 Rp. 1,800.00
Bahan 5.0000 Kg Floor Hardener Rp. 32,500.00 Rp. 162,500.00
Jumlah Rp. 23,400.00 Rp. 162,500.00 Rp. 185,900.00
Overhead 0.1000 Rp. 18,590.00
Jumlah Rp. 204,490.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 204,400.00

H. ANALISA HARGA SATUAN PEKERJAAN KAYU

! 11 dari 26
89 1 M3 Anal. Pembuatan dan Pemasangan Kusen Pintu dan Kusen Jendela, Kayu Kelas I
(SNI 2839-2008 - Analisa 6.7)
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.1.1)
Upah 7.0000 OH Pekerja Rp. 75,000.00 Rp. 525,000.00
21.0000 OH Tukang Kayu Rp. 100,000.00 Rp. 2,100,000.00
2.1000 OH Kepala Tukang Rp. 150,000.00 Rp. 315,000.00
0.3500 OH Mandor Rp. 100,000.00 Rp. 35,000.00
Bahan 1.1000 M3 Balok Kayu Rp. 3,821,400.00 Rp. 4,203,540.00
1.2500 Kg Paku 10 cm Rp. 22,627.00 Rp. 28,283.75
1.0000 Kg Lem Kayu Rp. 16,800.00 Rp. 16,800.00
Jumlah Rp. 2,975,000.00 Rp. 4,248,623.75 Rp. 7,223,623.75
Overhead 0.1000 Rp. 722,362.38
Jumlah Rp. 7,945,986.13
Total Harga Satuan Pekerjaan Dibulatkan Rp. 7,945,900.00

90 1 M2 Anal. Pembuatan dan Pemasangan Daun Pintu Panel, Kayu Kelas I


(SNI 2839-2008 - Analisa 6.7)
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.1.5)
Upah 1.0000 OH Pekerja Rp. 75,000.00 Rp. 75,000.00
3.0000 OH Tukang Kayu Rp. 100,000.00 Rp. 300,000.00
0.3000 OH Kepala Tukang Rp. 150,000.00 Rp. 45,000.00
0.0500 OH Mandor Rp. 100,000.00 Rp. 5,000.00
Bahan 0.0400 M3 Papan Kayu Rp. 3,946,700.00 Rp. 157,868.00
0.5000 Kg Lem Kayu Rp. 16,800.00 Rp. 8,400.00
Jumlah Rp. 425,000.00 Rp. 166,268.00 Rp. 591,268.00
Overhead 0.1000 Rp. 59,126.80
Jumlah Rp. 650,394.80
Total Harga Satuan Pekerjaan Dibulatkan Rp. 650,300.00

I. ANALISA HARGA SATUAN PEKERJAAN LANGIT-LANGIT DAN PARTISI

91 1 M2 Pemasangan Plafond Fiber Cement Uk. 1200x2400x8 mm Jarak 60x60 cm


(SNI 2839-2008 - Analisa 6.7)
Upah 0.4500 OH Pekerja Rp. 75,000.00 Rp. 33,750.00
0.4000 OH Tukang Kayu Rp. 100,000.00 Rp. 40,000.00
0.0400 OH Kepala Tukang Rp. 150,000.00 Rp. 6,000.00
0.0230 OH Mandor Rp. 100,000.00 Rp. 2,300.00
Bahan 0.6900 Btg Hollow 20x40x0,06 @4m Rp. 21,500.00 Rp. 14,835.00
0.5000 M' Lis Pinggir 20.20 Rp. 6,000.00 Rp. 3,000.00
3.1000 Bh Plat Hollow Rp. 500.00 Rp. 1,550.00
0.7000 M' Rod M5 Drat @ 1m Rp. 1,200.00 Rp. 840.00
0.7000 Bh U Clamp Hollow 20x40 Rp. 1,800.00 Rp. 1,260.00
0.7000 Bh Angle Clip + Paku Mesiu Rp. 1,800.00 Rp. 1,260.00
0.3470 Lbr Fiber Cement Tebal 8 mm setara Kalsibard Rp. 110,000.00 Rp. 38,170.00
25.0000 Pcs Skrup Gypsum Rp. 45.00 Rp. 1,125.00
0.0300 Zak Compound @ 20 kg Rp. 65,000.00 Rp. 1,950.00
0.0300 Ktk PB 1" Rp. 42,446.25 Rp. 1,273.39
0.0300 M' Joint Tape Rp. 5,000.00 Rp. 150.00
Jumlah Rp. 82,050.00 Rp. 65,413.39 Rp. 147,463.39
Overhead 0.1000 Rp. 14,746.34
Jumlah Rp. 162,209.73
Total Harga Satuan Pekerjaan Dibulatkan Rp. 162,200.00

92 1 M2 Pemasangan Plafond Fiber Cement /Ceiling Acoustic


(SNI 2839-2008 - Analisa 6.7)
Upah 0.4500 OH Pekerja Rp. 75,000.00 Rp. 33,750.00
0.4000 OH Tukang Kayu Rp. 100,000.00 Rp. 40,000.00
0.0400 OH Kepala Tukang Rp. 150,000.00 Rp. 6,000.00
0.0230 OH Mandor Rp. 100,000.00 Rp. 2,300.00
Bahan 0.2310 Btg Maintee @ 3,6 m Rp. 32,500.00 Rp. 7,507.50
1.3900 Btg Crosstee@1,2 m Rp. 15,000.00 Rp. 20,850.00
0.2000 Btg Lis Wall Angle @3 m Rp. 19,000.00 Rp. 3,800.00
1.3900 M' Rod Kait/Tekuk @1 m Rp. 2,500.00 Rp. 3,475.00
1.3900 Bh Clipper/Adjuster Rp. 1,200.00 Rp. 1,668.00
1.3900 Kg Paku, Mesiu + Angle Clep Rp. 2,500.00 Rp. 3,475.00
0.0300 Kg Paku Beton 1" Rp. 42,446.25 Rp. 1,273.39
1.3900 M2 Fiber Cement Tebal 8 mm type Acustic Panel Rp. 145,000.00 Rp. 201,550.00
Jumlah Rp. 82,050.00 Rp. 243,598.89 Rp. 325,648.89
Overhead 0.1000 Rp. 32,564.89
Jumlah Rp. 358,213.78
Total Harga Satuan Pekerjaan Dibulatkan Rp. 358,200.00

93 1 M' Anal. Pek. Memasang List Plafond


(SNI 2839-2008 - Analisa 6.8)
Upah 0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
0.0060 OH Kepala Tukang Rp. 150,000.00 Rp. 900.00
0.0600 OH Tukang Kayu Rp. 100,000.00 Rp. 6,000.00
0.0600 OH Pekerja Rp. 75,000.00 Rp. 4,500.00
Bahan 1.0500 m' List Plafond Rp. 6,000.00 Rp. 6,300.00
0.0100 Kg Paku Rp. 24,000.00 Rp. 240.00
Jumlah Rp. 11,700.00 Rp. 6,540.00 Rp. 18,240.00
Overhead 0.1000 Rp. 1,824.00
Total Harga Satuan Pekerjaan Rp. 20,064.00

94 1 M2 Anal. Memasang Rangka Plafond Hollow 20x40x0.6 mm


Upah 0.3000 OH Tukang Rp. 100,000.00 Rp. 30,000.00
0.0300 OH Kepala Tukang Rp. 150,000.00 Rp. 4,500.00
0.2000 OH Pekerja Rp. 75,000.00 Rp. 15,000.00
0.0100 OH Mandor Rp. 100,000.00 Rp. 1,000.00

! 12 dari 26
Bahan 5.5000 M' Hollow 20x40x0.6 mm Rp. 27,000.00 Rp. 148,500.00
0.5000 M' Baja Steel Stuud / Furring/Chanel Rp. 27,500.00 Rp. 13,750.00
0.1000 Kg Paku Sekrup Rp. 24,000.00 Rp. 2,400.00
Jumlah Rp. 50,500.00 Rp. 164,650.00 Rp. 215,150.00
Overhead 0.1000 Rp. 21,515.00
Total Harga Satuan Pekerjaan Rp. 236,665.00

95 1 M2 Pemasangan Dinding Partisi Fiber Cement Tebal 6 mm setara Kalsibord [2 Sisi]


Upah 0.1500 OH Pekerja Rp. 75,000.00 Rp. 11,250.00
0.4500 OH Tukang Kayu Rp. 100,000.00 Rp. 45,000.00
0.0450 OH Kepala Tukang Rp. 150,000.00 Rp. 6,750.00
0.0080 OH Mandor Rp. 100,000.00 Rp. 800.00

Bahan 1.0000 M2 Rangka Baja Steel Stuud Rp. 27,500.00 Rp. 27,500.00
1.0000 M2 Fiber Cement Non Asbes tb 6 mm Rp. 28,554.15 Rp. 28,554.15
0.3500 Pcs Skrup Gypsum Rp. 45.00 Rp. 15.75
0.4500 Zak Compound @ 20 kg Rp. 65,000.00 Rp. 29,250.00
8.0000 M' Joint Tape Rp. 5,000.00 Rp. 40,000.00
Jumlah Rp. 63,800.00 Rp. 125,319.90 Rp. 189,119.90
Overhead 0.1000 Rp. 18,911.99
Jumlah Rp. 208,031.89
Total Harga Satuan Pekerjaan Dibulatkan Rp. 208,000.00

J. ANALISA HARGA SATUAN PEKERJAAN PENGECATAN

96 1 M2 Anal. Mencat Kayu Baru 1 x Plamir + 1 x Dasar + 3 Lapis Cat Penutup


Upah 0.0025 OH Mandor Rp. 100,000.00 Rp. 250.00
0.0040 OH Kepala Tukang Rp. 150,000.00 Rp. 600.00
0.1050 OH Tukang cat Rp. 100,000.00 Rp. 10,500.00
0.0700 OH Pekerja Rp. 75,000.00 Rp. 5,250.00
Bahan 0.2000 Kg Cat Meni Rp. 25,925.00 Rp. 5,185.00
0.1500 Kg Plamur Kayu Rp. 22,200.00 Rp. 3,330.00
0.1700 Kg Cat Dasar Rp. 26,400.00 Rp. 4,488.00
0.3500 Kg Cat Minyak 3x ex. Platon Rp. 48,500.00 Rp. 16,975.00
Jumlah Rp. 16,600.00 Rp. 29,978.00 46,578.00
0.1000 Overhead Rp. 4,657.80
Jumlah + Overhead Rp. 51,235.80

97 1 M2 Anal. Mencat Tembok Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 2 Lapis Cat Penutup Lt. 1
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.7.1.10)
Upah 0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
0.0063 OH Kepala Tukang Rp. 150,000.00 Rp. 945.00
0.0630 OH Tukang cat Rp. 100,000.00 Rp. 6,300.00
0.0200 OH Pekerja Rp. 75,000.00 Rp. 1,500.00
Bahan 0.1000 Kg Plamur (Dempul Tembok) Rp. 16,000.00 Rp. 1,600.00
0.1000 Kg Cat Dasar Rp. 26,400.00 Rp. 2,640.00
0.2600 Kg Cat Air 2x ex. Dulux Rp. 105,000.00 Rp. 27,300.00
Jumlah Rp. 9,045.00 Rp. 31,540.00 40,585.00
Overhead 0.1000 Rp. 4,058.50
Jumlah Rp. 44,643.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 44,600.00

98 1 M2 Anal. Mencat Tembok Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 2 Lapis Cat Penutup Lt. 2
Upah 1.0900 Upah Pengecatan Lt. 1 Rp. 9,045.00 Rp. 9,859.05
Bahan 1.0000 Bahan Pengecatan Lt. 1 Rp. 31,540.00 Rp. 31,540.00
Jumlah Rp. 9,859.05 Rp. 31,540.00 Rp. 41,399.05
Overhead 0.1000 Rp. 4,139.91
Jumlah Rp. 45,538.96
Total Harga Satuan Pekerjaan Dibulatkan Rp. 45,500.00

99 1 M2 Anal. Mencat Tembok Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 2 Lapis Cat Penutup Lt. 3
Upah 1.1200 Upah Pengecatan Lt. 1 Rp. 9,045.00 Rp. 10,130.40
Bahan 1.0000 Bahan Pengecatan Lt. 1 Rp. 31,540.00 Rp. 31,540.00
Jumlah Rp. 10,130.40 Rp. 31,540.00 Rp. 41,670.40
Overhead 0.1000 Rp. 4,167.04
Jumlah Rp. 45,837.44
Total Harga Satuan Pekerjaan Dibulatkan Rp. 45,800.00

100 1 M2 Anal. Mencat Bidang Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 3 Lapis Cat Penutup/ Interior
Upah 0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
0.0063 OH Kepala Tukang Rp. 150,000.00 Rp. 945.00
0.0630 OH Tukang cat Rp. 100,000.00 Rp. 6,300.00
0.0200 OH Pekerja Rp. 75,000.00 Rp. 1,500.00
1.0000 Ls Steger werk Rp. 1,000.00 1,000.00
0.1000 Kg Plamur (Dempul Tembok) Rp. 16,000.00 Rp. Rp. 1,600.00
0.1000 Kg Cat Dasar Rp. 26,400.00 Rp. Rp. 2,640.00
0.3600 Kg Cat Air 3x ex. Dulux ICI Rp. 99,000.00 Rp. Rp. 35,640.00
Jumlah Rp. 9,045.00 40,880.00 Rp. 49,925.00
Overhead 0.1000 Rp. 4,992.50
Jumlah Rp. 54,917.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 54,900.00

101 1 M2 Anal. Pengecatan Permukaan Baja Galvanish Secara Manual Sistem 1 Lapis Cat
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.7.1.16)
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.7.1.19)
Upah 0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
0.0120 OH Kepala Tukang Rp. 150,000.00 Rp. 1,800.00
0.0600 OH Tukang cat Rp. 100,000.00 Rp. 6,000.00
0.0600 OH Pekerja Rp. 75,000.00 Rp. 4,500.00
Bahan 0.3000 Kg Cat Minyak 2x setara Platon Rp. 48,500.00 Rp. 14,550.00
0.0100 Bh Kuas Rp. 14,200.00 Rp. 142.00

! 13 dari 26
0.0100 Ltr Pengencer Rp. 17,300.00 Rp. 173.00
Jumlah Rp. 12,600.00 Rp. 14,865.00 27,465.00
Overhead 0.1000 Rp. 2,746.50
Jumlah Rp. 30,211.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 30,200.00

102 1 M2 Anal. Pengecatan Permukaan Batu Alam 2 Lapis


Upah 0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
0.0063 OH Kepala Tukang Rp. 150,000.00 Rp. 945.00
0.0630 OH Tukang cat Rp. 100,000.00 Rp. 6,300.00
0.0200 OH Pekerja Rp. 75,000.00 Rp. 1,500.00
Bahan 0.2000 Ltr Cat Batu Alam 2x setara Propan Rp. 78,500.00 Rp. 15,700.00
0.0100 Bh Kuas Rp. 14,200.00 Rp. 142.00
Jumlah Rp. 9,045.00 Rp. 15,842.00 24,887.00
Overhead 0.1000 Rp. 2,488.70
Jumlah Rp. 27,375.70
Total Harga Satuan Pekerjaan Dibulatkan Rp. 27,300.00

K. ANALISA HARGA SATUAN PEKERJAAN BESI, ALUMINIUM, PINTU/ JENDELA

103 1 Kg Anal. Pemasangan Besi Baja Profil


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.2.1.1)
Upah 0.0600 OH Pekerja Rp. 75,000.00 Rp. 4,500.00
0.0600 OH Tukang Las Konstruksi Rp. 100,000.00 Rp. 6,000.00
0.0060 OH Kepala Tukang Rp. 150,000.00 Rp. 900.00
0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
Bahan 1.1500 Kg Besi Profil Rp. 21,223.13 Rp. 24,406.60
Jumlah Rp. 11,700.00 Rp. 24,406.60 Rp. 36,106.60
Overhead 0.1000 Rp. 3,610.66
Jumlah Rp. 39,717.26
Total Harga Satuan Pekerjaan Dibulatkan Rp. 39,700.00

104 Anal. Pasangan Daun Pintu Besi Plat Tebal 2 mm Rangkap, Rangka Baja Siku/ M2
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.2.1.4)
Bahan 1.0500 OH Pekerja Rp. 75,000.00 Rp. 78,750.00
1.0500 OH Tukang Besi Rp. 100,000.00 Rp. 105,000.00
0.1050 OH Kepala Tukang Rp. 150,000.00 Rp. 15,750.00
0.0520 OH Mandor Rp. 100,000.00 Rp. 5,200.00
15.0000 Kg Besi Siku L 30.30.3 Rp. 21,223.13 Rp. 318,346.95
1.1000 M2 Besi Plat Baja Tebal 2 mm Rp. 470,000.00 Rp. 517,000.00
0.0500 Kg Kawat Las Rp. 87,500.00 Rp. 4,375.00
Jumlah Rp. 204,700.00 Rp. 839,721.95 Rp. 1,044,421.95
Overhead 0.1000 Rp. 104,442.20
Jumlah Rp. 1,148,864.15
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,148,800.00

105 1 cm Anal. Pengelasan dengan Las Listrik


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.2.1.5)
Upah 0.0002 OH Mandor Rp. 100,000.00 Rp. 20.00
0.0002 OH Kepala Tukang Rp. 150,000.00 Rp. 30.00
0.0020 OH Tukang Besi Rp. 100,000.00 Rp. 200.00
0.0040 OH Pekerja Rp. 75,000.00 Rp. 300.00
Bahan 0.0400 Kg Kawat Listrik Rp. 87,500.00 Rp. 3,500.00
0.0300 Liter Solar Rp. 7,900.00 Rp. 237.00
0.0040 Liter Minyak Pelumas Rp. 28,900.00 Rp. 115.60
Alat 0.0170 Jam Sewa Alat Rp. 30,500.00 Rp. 518.50
Jumlah Rp. 550.00 Rp. 4,371.10 4,921.10
Overhead 0.1000 Rp. 492.11
Jumlah Rp. 5,413.21
Total Harga Satuan Pekerjaan Dibulatkan Rp. 5,400.00

106 1 M2 Anal. Pemasangan Pintu Rolling Door Besi


(SNI 2839-2008 - Analisa 6.7)
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.2.1.7)
Upah 1.2000 OH Pekerja Rp. 75,000.00 Rp. 90,000.00
1.2000 OH Tukang Las Rp. 100,000.00 Rp. 120,000.00
0.1200 OH Kepala Tukang Rp. 150,000.00 Rp. 18,000.00
0.0060 OH Mandor Rp. 100,000.00 Rp. 600.00
Bahan 1.0000 M2 Pintu Rolling Door Rp. 885,000.00 Rp. 885,000.00
Jumlah Rp. 228,600.00 Rp. 885,000.00 Rp. 1,113,600.00
Overhead 0.1000 Rp. 111,360.00
Jumlah Rp. 1,224,960.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,224,900.00

107 1 M' Anal. Memasang Kusen Aluminium 3" Color Anodized


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.2.1.11)
Upah 0.0430 OH Pekerja Rp. 75,000.00 Rp. 3,225.00
0.0430 OH Tukang Khusus Aluminium Rp. 100,000.00 Rp. 4,300.00
0.0043 OH Kepala Tukang Rp. 150,000.00 Rp. 645.00
0.0021 OH Mandor Rp. 100,000.00 Rp. 210.00
Bahan 1.1000 M' Profil Aluminium 3" Anodized Rp. 95,000.00 Rp. 104,500.00
2.0000 Buah Skrup Fixer Rp. 7,500.00 Rp. 15,000.00
0.0600 Tube Sealant Rp. 20,000.00 Rp. 1,200.00
Jumlah Rp. 8,380.00 Rp. 120,700.00 Rp. 129,080.00
Overhead 0.1000 Rp. 12,908.00
Jumlah Rp. 141,988.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 141,900.00

108 1 M' Anal. Memasang Kusen Aluminium 3" Powder Coating


(SNI 7393-2008 - Analisa 6.11)
Upah 0.0430 OH Pekerja Rp. 75,000.00 Rp. 3,225.00
0.0430 OH Tukang Khusus Aluminium Rp. 100,000.00 Rp. 4,300.00

! 14 dari 26
0.0043 OH Kepala Tukang Rp. 150,000.00 Rp. 645.00
0.0021 OH Mandor Rp. 100,000.00 Rp. 210.00
Bahan 1.1000 M' Profil Aluminium 3" Anodized Coating Rp. 100,000.00 Rp. 110,000.00
2.0000 Buah Skrup Fixer Rp. 7,500.00 Rp. 15,000.00
0.0600 Tube Sealant Rp. 20,000.00 Rp. 1,200.00
Jumlah Rp. 8,380.00 Rp. 126,200.00 Rp. 134,580.00
Overhead 0.1000 Rp. 13,458.00
Total Harga Satuan Pekerjaan Rp. 148,038.00

109 1 M' Anal. Memasang Frame Jendela Casement 4" Color Anodized
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.2.1.11)
Upah 0.0430 OH Pekerja Rp. 75,000.00 Rp. 3,225.00
0.0430 OH Tukang Besi Rp. 100,000.00 Rp. 4,300.00
0.0043 OH Kepala Tukang Rp. 150,000.00 Rp. 645.00
0.0021 OH Mandor Rp. 100,000.00 Rp. 210.00
Bahan 1.1000 M' Frame Daun Pintu/ Jendela Aluminium 4" Coating Rp. 100,000.00 Rp. 110,000.00
2.0000 Buah Skrup Fixer Rp. 7,500.00 Rp. 15,000.00
0.0600 Tube Sealant Rp. 20,000.00 Rp. 1,200.00
Jumlah Rp. 8,380.00 Rp. 126,200.00 Rp. 134,580.00
Overhead 0.1000 Rp. 13,458.00
Jumlah Rp. 148,038.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 148,000.00

110 1 M2 Anal. Memasang Terali Besi Strip 20x3 mm


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.2.1.15)
Upah 1.6700 OH Pekerja Rp. 75,000.00 Rp. 125,250.00
1.6700 OH Tukang Las Rp. 100,000.00 Rp. 167,000.00
0.1670 OH Kepala Tukang Rp. 150,000.00 Rp. 25,050.00
0.0830 OH Mandor Rp. 100,000.00 Rp. 8,300.00
Bahan 6.1770 Kg Besi Strip Rp. 21,223.13 Rp. 131,095.27
27.0800 cm Pengelasan Rp. 5,400.00 Rp. 146,232.00
Jumlah Rp. 325,600.00 Rp. 277,327.27 Rp. 602,927.27
Overhead 0.1000 Rp. 60,292.73
Jumlah Rp. 663,220.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 663,200.00

111 Anal. Pasang Pegangan Pintu (Pull Handle setara Dekkson) / Buah
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.1')
Upah 0.0600 OH Pekerja Rp. 75,000.00 Rp. 4,500.00
0.6000 OH Tukang Besi/ Aluminium Rp. 100,000.00 Rp. 60,000.00
0.0600 OH Kepala Tukang Rp. 150,000.00 Rp. 9,000.00
0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
Bahan 1.0000 Bh Pull Handle Dekkson PH DL802 38X1000 PSS Rp. 1,512,500.00 Rp. 1,512,500.00
Jumlah Rp. 73,800.00 Rp. 1,512,500.00 Rp. 1,586,300.00
Overhead 0.1000 Rp. 158,630.00
Jumlah Rp. 1,744,930.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,744,900.00

112 Anal. Pemasangan Pegangan Pintu setara (Lever Handle setara HRE 61.69 Solid ) / Buah
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.1')
Upah 0.0600 OH Pekerja Rp. 75,000.00 Rp. 4,500.00
0.6000 OH Tukang Besi/ Aluminium Rp. 100,000.00 Rp. 60,000.00
0.0600 OH Kepala Tukang Rp. 150,000.00 Rp. 9,000.00
0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
Bahan 1.0000 Bh Lever Handle setara HRE 61.69 Solid Rp. 291,500.00 Rp. 291,500.00
Jumlah Rp. 73,800.00 Rp. 291,500.00 Rp. 365,300.00
Overhead 0.1000 Rp. 36,530.00
Jumlah Rp. 401,830.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 401,800.00

113 Anal. Pasang Escutcheon setara Dekkson / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.4')
Upah 0.0050 OH Pekerja Rp. 75,000.00 Rp. 375.00
0.5000 OH Tukang Besi/ Aluminium Rp. 100,000.00 Rp. 50,000.00
0.0500 OH Kepala Tukang Rp. 150,000.00 Rp. 7,500.00
0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
Bahan 1.0000 Bh Escutcheon Dekkson ESCN 84030 Oval SSS Rp. 62,500.00 Rp. Rp. 62,500.00
Jumlah Rp. 58,175.00 Rp. 62,500.00 Rp. 120,675.00
Overhead 0.1000 Rp. 12,067.50
Jumlah Rp. 132,742.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 132,700.00

114 Anal. Pasang Double Cylinder setara Dekkson / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.4')
Upah 0.0050 OH Pekerja Rp. 75,000.00 Rp. 375.00
0.5000 OH Tukang Besi/ Aluminium Rp. 100,000.00 Rp. 50,000.00
0.0500 OH Kepala Tukang Rp. 150,000.00 Rp. 7,500.00
0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
Bahan 1.0000 Bh Cylinder Dekkson CYL DC DL65MM SN Rp. 162,500.00 Rp. Rp. 162,500.00
Jumlah Rp. 58,175.00 Rp. 162,500.00 Rp. 220,675.00
Overhead 0.1000 Rp. 22,067.50
Jumlah Rp. 242,742.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 242,700.00

115 Anal. Pasang Roller Lockcase setara LC102WL-40 Solid / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.-)
Upah 0.0050 OH Pekerja Rp. 75,000.00 Rp. 375.00
0.5000 OH Tukang Besi/ Aluminium Rp. 100,000.00 Rp. 50,000.00
0.0500 OH Kepala Tukang Rp. 150,000.00 Rp. 7,500.00
Bahan 0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
1.0000 Bh Roller Lockcase setara LC102WL-40 Solid Rp. 257,500.00 Rp. Rp. 257,500.00
Jumlah Rp. 58,175.00 Rp. 257,500.00 Rp. 315,675.00

! 15 dari 26
Overhead 0.1000 Rp. 31,567.50
Total Harga Satuan Pekerjaan Rp. 347,242.50

116 Anal. Pasang Lockcase setara Dekkson / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.4')
Upah 0.0050 OH Pekerja Rp. 75,000.00 Rp. 375.00
0.5000 OH Tukang Besi/ Aluminium Rp. 100,000.00 Rp. 50,000.00
0.0500 OH Kepala Tukang Rp. 150,000.00 Rp. 7,500.00
Bahan 0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
1.0000 Bh Mortise Lock Dekkson MTS RL DL84030 SSS Rp. 257,500.00 Rp. Rp. 257,500.00
Jumlah Rp. 58,175.00 Rp. 257,500.00 Rp. 315,675.00
Overhead 0.1000 Rp. 31,567.50
Jumlah Rp. 347,242.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 347,200.00

117 Anal. Pasang Engsel Pintu Setara Dekkson / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.5)
Upah 0.0150 OH Pekerja Rp. 75,000.00 Rp. 1,125.00
0.1500 OH Tukang Besi/ Aluminium Rp. 100,000.00 Rp. 15,000.00
0.0150 OH Kepala Tukang Rp. 150,000.00 Rp. 2,250.00
0.0008 OH Mandor Rp. 100,000.00 Rp. 80.00
Bahan 1.0000 Bh Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 127,000.00 Rp. 127,000.00
Jumlah Rp. 18,455.00 Rp. 127,000.00 Rp. 145,455.00
Overhead 0.1000 Rp. 14,545.50
Jumlah Rp. 160,000.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 160,000.00

118 Anal. Pasang Engsel Casement Setara Dekkson / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.7)
Upah 0.1000 OH Pekerja Rp. 75,000.00 Rp. 7,500.00
0.2000 OH Tukang Besi/ Aluminium Rp. 100,000.00 Rp. 20,000.00
0.0200 OH Kepala Tukang Rp. 150,000.00 Rp. 3,000.00
0.0005 OH Mandor Rp. 100,000.00 Rp. 50.00
Bahan 1.0000 Bh Engsel Casement /Friction Stay Dekkson FS S/S 20" Rp. 443,900.00 Rp. 443,900.00
Jumlah Rp. 30,550.00 Rp. 443,900.00 Rp. 474,450.00
Overhead 0.1000 Rp. 47,445.00
Jumlah Rp. 521,895.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 521,800.00

119 Anal. Pasang Handle Jendela setara Dekkson / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.8')
Upah 0.0150 OH Pekerja Rp. 75,000.00 Rp. 1,125.00
0.1500 OH Tukang Besi/ Aluminium Rp. 100,000.00 Rp. 15,000.00
0.0150 OH Kepala Tukang Rp. 150,000.00 Rp. 2,250.00
0.0080 OH Mandor Rp. 100,000.00 Rp. 800.00
Bahan 1.0000 Bh Handle Casement /Dekkson CH 425 R/H NA Rp. 24,000.00 Rp. 24,000.00
Jumlah Rp. 19,175.00 Rp. 24,000.00 Rp. 43,175.00
Overhead 0.1000 Rp. 4,317.50
Jumlah Rp. 47,492.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 47,400.00

120 1 M2 Anal. Pasang Kaca Buram Tebal 5 mm


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.17')
Upah 0.0150 OH Pekerja Rp. 75,000.00 Rp. 1,125.00
0.1500 OH Tukang Kayu Rp. 100,000.00 Rp. 15,000.00
0.0150 OH Kepala Tukang Rp. 150,000.00 Rp. 2,250.00
0.0008 OH Mandor Rp. 100,000.00 Rp. 80.00
Bahan 1.1000 M2 Kaca Buram Tebal 5 mm Rp. 90,000.00 Rp. 99,000.00
0.0500 Kg Sealant Rp. 5,000.00 Rp. 250.00
Jumlah Rp. 18,455.00 Rp. 99,250.00 Rp. 117,705.00
Overhead 0.1000 Rp. 11,770.50
Jumlah Rp. 129,475.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 129,400.00

121 1 M2 Anal. Pasang Kaca Buram Tebal 8 mm


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.18')
Upah 0.0170 OH Pekerja Rp. 75,000.00 Rp. 1,275.00
0.1700 OH Tukang Kayu Rp. 100,000.00 Rp. 17,000.00
0.0170 OH Kepala Tukang Rp. 150,000.00 Rp. 2,550.00
0.0009 OH Mandor Rp. 100,000.00 Rp. 90.00
Bahan 1.1000 M2 Kaca Buram Tebal 8 mm Rp. 120,000.00 Rp. 132,000.00
0.0700 Kg Sealant Rp. 5,000.00 Rp. 350.00
Jumlah Rp. 20,915.00 Rp. 132,350.00 Rp. 153,265.00
Overhead 0.1000 Rp. 15,326.50
Jumlah Rp. 168,591.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 168,500.00

122 1 M2 Anal. Pasang Kaca Tempered Stopsol Tebal 8 mm


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.18')
Upah 0.0170 OH Pekerja Rp. 75,000.00 Rp. 1,275.00
0.1700 OH Tukang Rp. 100,000.00 Rp. 17,000.00
0.0170 OH Kepala Tukang Rp. 150,000.00 Rp. 2,550.00
0.0009 OH Mandor Rp. 100,000.00 Rp. 90.00
Bahan 1.1000 M2 Kaca Tempered Stopsol Tebal 8 mm Rp. 575,000.00 Rp. 632,500.00
0.0700 Kg Sealant Rp. 5,000.00 Rp. 350.00
Jumlah Rp. 20,915.00 Rp. 632,850.00 Rp. 653,765.00
Overhead 0.1000 Rp. 65,376.50
Jumlah Rp. 719,141.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 719,100.00

123 1 M2 Anal. Pasang Kaca Bening Tebal 8 mm


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.18)

! 16 dari 26
Upah 0.0170 OH Pekerja Rp. 75,000.00 Rp. 1,275.00
0.1700 OH Tukang Rp. 100,000.00 Rp. 17,000.00
0.0170 OH Kepala Tukang Rp. 150,000.00 Rp. 2,550.00
0.0009 OH Mandor Rp. 100,000.00 Rp. 90.00
Bahan 1.1000 M2 Kaca Bening Tebal 8 mm Rp. 140,000.00 Rp. 154,000.00
0.0700 Kg Sealant Rp. 5,000.00 Rp. 350.00
Jumlah Rp. 20,915.00 Rp. 154,350.00 Rp. 175,265.00
Overhead 0.1000 Rp. 17,526.50
Jumlah Rp. 192,791.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 192,700.00

124 1 M2 Anal. Pasang Kaca Cermin Tebal 5 mm


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.2.21)
Upah 0.0150 OH Pekerja Rp. 75,000.00 Rp. 1,125.00
0.1500 OH Tukang Besi Rp. 100,000.00 Rp. 15,000.00
0.0150 OH Kepala Tukang Rp. 150,000.00 Rp. 2,250.00
0.0080 OH Mandor Rp. 100,000.00 Rp. 800.00
Bahan 1.1000 M2 Kaca Cermin Tebal 5 mm Rp. 135,000.00 Rp. 148,500.00
Jumlah Rp. 19,175.00 148,500.00 Rp. 167,675.00
Overhead 0.1000 Rp. 16,767.50
Jumlah Rp. 184,442.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 184,400.00

125 Anal. Pasangan Jendela Type J1/ Unit


Bahan + 26.20 M' Kusen Aluminium Color Anodized Coating Color 3" Rp. 141,900.00 Rp. 3,717,780.00
Upah 8.2000 M' Daun Jendela Aluminium Color Anodized Coating Color 4" Rp. 148,000.00 Rp. 1,213,600.00
8.4000 M2 Kaca Tempered Stopsol Tebal 8 mm Rp. 719,100.00 Rp. 6,040,440.00
100.00 M' Karet Kaca Rp. 2,000.00 Rp. 200,000.00
4.0000 Set Handle Casement /Dekkson CH 425 R/H NA Rp. 47,400.00 Rp. 189,600.00
8.0000 Set Engsel Casement /Friction Stay Dekkson FS S/S 20" Rp. 521,800.00 Rp. 4,174,400.00
Jumlah Rp. 15,535,820.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 15,535,800.00

126 Anal. Pasangan Jendela Type J2/ Unit


Bahan + 16.30 M' Kusen Aluminium Color Anodized Coating Color 3" Rp. 141,900.00 Rp. 2,312,970.00
Upah 5.4000 M' Daun Jendela Aluminium Color Anodized Coating Color 4" Rp. 148,000.00 Rp. 799,200.00
2.2200 M2 Kaca Tempered Stopsol Tebal 8 mm Rp. 719,100.00 Rp. 1,596,402.00
1.56 M2 Kisi Aluminium Rp. 350,000.00 Rp. 546,000.00
9.80 M' Karet Kaca Rp. 2,000.00 Rp. 19,600.00
4.0000 Set Handle Casement /Dekkson CH 425 R/H NA Rp. 47,400.00 Rp. 189,600.00
8.0000 Set Engsel Casement /Friction Stay Dekkson FS S/S 20" Rp. 521,800.00 Rp. 4,174,400.00
Jumlah Rp. 9,638,172.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 9,638,100.00

127 Anal. Pasangan Jendela Type J3/ Unit


Bahan + 18.10 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 2,568,390.00
Upah 2.7000 M' Daun Jendela Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 399,600.00
2.55 M2 Kaca Tempered Stopsol Tebal 8 mm Rp. 719,100.00 Rp. 1,830,828.60
1.96 M2 Kisi Aluminium + Frame Rp. 350,000.00 Rp. 686,000.00
87.40 M' Karet Kaca Rp. 2,000.00 Rp. 174,800.00
4.0000 Set Handle Casement /Dekkson CH 425 R/H NA Rp. 47,400.00 Rp. 189,600.00
8.0000 Set Engsel Casement /Friction Stay Dekkson FS S/S 20" Rp. 521,800.00 Rp. 4,174,400.00
Jumlah Rp. 10,023,618.60
Total Harga Satuan Pekerjaan Dibulatkan Rp. 10,023,600.00

128 Anal. Pasangan Jendela Type J1-D/ Unit


Bahan + 31.80 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 4,512,420.00
Upah 23.2000 M' Daun Jendela Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 3,433,600.00
12.60 M2 Kaca Tempered Stopsol Tebal 8 mm Rp. 719,100.00 Rp. 9,060,660.00
155.6000 M' Karet Kaca Rp. 2,000.00 Rp. 311,200.00
4.0000 Set Handle Casement /Dekkson CH 425 R/H NA Rp. 47,400.00 Rp. 189,600.00
8.0000 Set Engsel Casement /Friction Stay Dekkson FS S/S 20" Rp. 521,800.00 Rp. 4,174,400.00
Jumlah Rp. 21,681,880.00
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 21,681,800.00

129 Anal. Pasangan Jendela Type BV 1/ Unit


Bahan + 9.8000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 1,390,620.00
Upah 1.4700 M2 Kaca Tempered Stopsol Tebal 8 mm Rp. 575,000.00 Rp. 845,250.00
1.2600 M2 Kisi Aluminium + Frame Rp. 350,000.00 Rp. 441,000.00
14.4000 M' Karet Kaca Rp. 2,000.00 Rp. 28,800.00
2.0000 Set Handle Casement /Dekkson CH 425 R/H NA Rp. 24,000.00 Rp. 48,000.00
4.0000 Set Engsel Casement /Friction Stay Dekkson FS S/S 20" Rp. 521,800.00 Rp. 2,087,200.00
Jumlah Rp. 4,840,870.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 4,840,800.00

130 Anal. Pasangan Jendela Type BV 2/ Unit


Bahan + 3.0000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 425,700.00
Upah 0.5400 M' Kaca Tempered Stopsol Tebal 8 mm Rp. 575,000.00 Rp. 310,500.00
3.00 M2 Karet Kaca Rp. 2,000.00 Rp. 6,000.00
Jumlah Rp. 742,200.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 742,200.00

131 Anal. Pasangan Jendela Type BV 3/ Unit


Bahan 6.0000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 851,400.00
1.4400 M' Kaca Bening Tebal 8 mm Rp. 575,000.00 Rp. 828,000.00
12.0000 M2 Karet Kaca Rp. 2,000.00 Rp. 24,000.00
Jumlah Rp. 1,703,400.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,703,400.00

132 Anal.Pasangan Ventilasi Rumah Pompa dan Genset/ Unit


Bahan + 4.6240 Kg Kusen Besi L 30.30.3 mm Rp. 39,700.00 Rp. 183,572.80

! 17 dari 26
Upah 0.5000 M2 Teralis Baja Strip Rp. 663,200.00 Rp. 331,600.00
1.3200 M2 Pengecatan Cat Minyak Rp. 30,200.00 Rp. 39,864.00
Jumlah Rp. 2,258,436.80
Total Harga Satuan Pekerjaan Dibulatkan Rp. 2,258,400.00

133 Anal. Pasangan Pintu Type PD-1/ Unit


Bahan + 27.8750 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 3,955,462.50
Upah 11.9488 M' Daun Pintu Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 1,768,422.40
7.6508 M' Daun Jendela Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 1,132,318.40
11.8800 M2 Kaca Bening Tebal 8 mm Rp. 192,700.00 Rp. 2,289,276.00
87.4400 M' Karet Kaca Rp. 2,000.00 Rp. 174,880.00
2.0000 Set Pull Handle Rp. 1,744,900.00 Rp. 3,489,800.00
2.0000 Set Lockcase Rp. 347,200.00 Rp. 694,400.00
2.0000 Set Double Cylinder Rp. 242,700.00 Rp. 485,400.00
2.0000 Set Escutcheon Rp. 132,700.00 Rp. 265,400.00
1.0000 Set Kunci Tanam / Flush Bolt Dekkson FB 508 NA Rp. 104,000.00 Rp. 104,000.00
4.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 640,000.00
2.0000 Set Handle Casement /Dekkson CH 425 R/H NA Rp. 24,000.00 Rp. 48,000.00
Jumlah Rp. 15,047,359.30
Total Harga Satuan Pekerjaan Dibulatkan Rp. 15,047,300.00

134 Anal. Pasangan Pintu Type PD-2/ Unit


Bahan + 10.7250 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 1,521,877.50
Upah 11.7000 M' Daun Pintu Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 1,731,600.00
6.8508 M' Daun Jendela Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 1,013,918.40
5.3550 M2 Kaca Bening Tebal 8 mm Rp. 192,700.00 Rp. 1,031,908.50
30.8000 M' Karet Kaca Rp. 2,000.00 Rp. 61,600.00
2.0000 Set Pull Handle Rp. 1,744,900.00 Rp. 3,489,800.00
2.0000 Set Lockcase Rp. 347,200.00 Rp. 694,400.00
2.0000 Set Double Cylinder Rp. 242,700.00 Rp. 485,400.00
2.0000 Set Escutcheon Rp. 132,700.00 Rp. 265,400.00
1.0000 Set Kunci Tanam / Flush Bolt Dekkson FB 508 NA Rp. 104,000.00 Rp. 104,000.00
4.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 640,000.00
2.0000 Set Handle Casement /Dekkson CH 425 R/H NA Rp. 24,000.00 Rp. 48,000.00
Jumlah Rp. 11,087,904.40
Total Harga Satuan Pekerjaan Dibulatkan Rp. 11,087,900.00

135 Anal. Pasangan Pintu Type PJ3/ Unit


Bahan + 12.3000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 1,745,370.00
Upah 5.6000 M' Daun Pintu Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 828,800.00
4.2350 M2 Kaca Bening Tebal 8 mm Rp. 192,700.00 Rp. 816,084.50
36.8000 M' Karet Kaca Rp. 2,000.00 Rp. 73,600.00
1.0000 Set Pull Handle Rp. 1,744,900.00 Rp. 1,744,900.00
1.0000 Set Lockcase Rp. 347,200.00 Rp. 347,200.00
1.0000 Set Double Cylinder Rp. 242,700.00 Rp. 242,700.00
1.0000 Set Escutcheon Rp. 132,700.00 Rp. 132,700.00
3.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 480,000.00
Jumlah Rp. 6,411,354.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 6,411,300.00

136 Anal. Pasangan Pintu Type P1/ Unit


Bahan + 7.2000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 1,021,680.00
Upah 6.0500 M' Daun Pintu Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 895,400.00
1.8900 M2 Panel Multipleks +HPL Rp. 1,200,000.00 Rp. 2,268,000.00
0.5500 M2 Kaca Buram Tebal 8 mm Rp. 168,500.00 Rp. 92,675.00
27.4000 M' Karet Kaca Rp. 2,000.00 Rp. 54,800.00
2.0000 Set Pull Handle Rp. 1,744,900.00 Rp. 3,489,800.00
2.0000 Set Lockcase Rp. 347,200.00 Rp. 694,400.00
2.0000 Set Double Cylinder Rp. 242,700.00 Rp. 485,400.00
2.0000 Set Escutcheon Rp. 132,700.00 Rp. 265,400.00
6.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 960,000.00
Jumlah Rp. 10,227,555.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 10,227,500.00

137 Anal. Pasangan Pintu Type P2a/ Unit


Bahan + 7.1000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 1,007,490.00
Upah 5.9500 M' Daun Pintu Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 880,600.00
1.7850 M' Panel Multipleks +HPL Rp. 1,200,000.00 Rp. 2,142,000.00
0.5500 Set Kaca Buram Tebal 8 mm Rp. 168,500.00 Rp. 92,675.00
27.4000 Set Karet Kaca Rp. 2,000.00 Rp. 54,800.00
1.0000 Set Pull Handle Rp. 1,512,500.00 Rp. 1,512,500.00
1.0000 Set Lockcase Rp. 347,200.00 Rp. 347,200.00
1.0000 Set Double Cylinder Rp. 242,700.00 Rp. 242,700.00
1.0000 Set Escutcheon Rp. 132,700.00 Rp. 132,700.00
3.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 480,000.00
Jumlah Rp. 6,892,665.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 6,892,600.00

138 Anal. Pasangan Pintu Type P2-b/ Unit [ Toilet]


Bahan + 7.1000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 1,007,490.00
Upah 5.9500 M2 Daun Pintu Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 880,600.00
1.7850 M2 Panel Alumnium Rp. 475,000.00 Rp. 847,875.00
0.3400 M2 Kisi Alumnium Rp. 350,000.00 Rp. 119,000.00
0.5500 M2 Kaca Buram Tebal 8 mm Rp. 168,500.00 Rp. 92,675.00
27.4000 M' Karet Kaca Rp. 2,000.00 Rp. 54,800.00
1.0000 Set Lever Handle Rp. 291,500.00 Rp. 291,500.00
1.0000 Set Lockcase Rp. 347,200.00 Rp. 347,200.00
1.0000 Set Double Cylinder Rp. 242,700.00 Rp. 242,700.00
1.0000 Set Escutcheon Rp. 132,700.00 Rp. 132,700.00
3.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 480,000.00
Jumlah Rp. 4,496,540.00

! 18 dari 26
Total Harga Satuan Pekerjaan Dibulatkan Rp. 4,496,500.00

139 Anal. Pasangan Pintu Type P3/ Unit [Shaft]


Bahan + 4.7000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 666,930.00
Upah 4.7000 M' Daun Pintu Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 695,600.00
1.1550 M' Panel Alumnium Rp. 168,500.00 Rp. 194,617.50
1.0000 Set Lever Handle Rp. 347,200.00 Rp. 347,200.00
1.0000 Set Lockcase Rp. 347,200.00 Rp. 347,200.00
1.0000 Set Double Cylinder Rp. 242,700.00 Rp. 242,700.00
1.0000 Set Escutcheon Rp. 132,700.00 Rp. 132,700.00
Jumlah Rp. 2,626,947.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 2,626,900.00

140 Anal. Pasangan Pintu Type P4/ Unit


Bahan + 12.0833 Kg Kusen Besi Siku 40.40.4 Rp. 39,700.00 Rp. 479,708.33
Upah 3.3600 M2 Daun Pintu Pelat Besi Tebal 1,2 mm Rp. 1,148,800.00 Rp. 3,859,968.00
1.0000 Set Lever Handle Rp. 291,500.00 Rp. 291,500.00
1.0000 Set Lockcase Rp. 347,200.00 Rp. 347,200.00
1.0000 Set Double Cylinder Rp. 242,700.00 Rp. 242,700.00
1.0000 Set Escutcheon Rp. 132,700.00 Rp. 132,700.00
3.0000 Set Engsel Pintu Rp. 160,000.00 Rp. 480,000.00
Jumlah Rp. 5,833,776.33
Total Harga Satuan Pekerjaan Dibulatkan Rp. 5,833,700.00

141 Anal. Pasangan Pintu Type P5/ Unit


Bahan + 12.0350 M' Kusen Besi Siku 40.40.4 Rp. 39,700.00 Rp. 477,789.50
Upah 1.6380 M2 Daun Pintu Pelat Besi Tebal 1,2 mm Rp. 1,148,800.00 Rp. 1,881,734.40
1.0000 Set Lever Handle Rp. 291,500.00 Rp. 291,500.00
1.0000 Set Lockcase Rp. 347,200.00 Rp. 347,200.00
1.0000 Set Double Cylinder Rp. 242,700.00 Rp. 242,700.00
1.0000 Set Escutcheon Rp. 132,700.00 Rp. 132,700.00
3.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 480,000.00
Jumlah Rp. 3,853,623.90
Total Harga Satuan Pekerjaan Dibulatkan Rp. 3,853,600.00

142 Anal. Pasangan Pintu Type P6/ Unit


Bahan + 9.0383 M' Kusen Besi Siku 40.40.4 Rp. 39,700.00 Rp. 358,821.83
Upah 1.3524 M2 Daun Pintu Pelat Besi Tebal 1,2 mm Rp. 1,148,800.00 Rp. 1,553,637.12
1.0000 Set Lever Handle Rp. 291,500.00 Rp. 291,500.00
1.0000 Set Lockcase Rp. 347,200.00 Rp. 347,200.00
1.0000 Set Double Cylinder Rp. 242,700.00 Rp. 242,700.00
1.0000 Set Escutcheon Rp. 132,700.00 Rp. 132,700.00
2.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 320,000.00
Jumlah Rp. 3,246,558.95
Total Harga Satuan Pekerjaan Dibulatkan Rp. 3,246,500.00

143 Anal. Pasangan Pintu Type PD 3/ Unit


Bahan + 22.6000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 3,206,940.00
Upah 8.8000 M2 Daun Pintu Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 1,302,400.00
3.1500 M2 Panel Multipleks mm + HPL Rp. 1,200,000.00 Rp. 3,780,000.00
2.8000 M2 Kaca Buram Tebal 8 mm Rp. 168,500.00 Rp. 471,800.00
15.4000 M' Karet Kaca Rp. 2,000.00 Rp. 30,800.00
1.0000 Set Lever Handle Rp. 291,500.00 Rp. 291,500.00
2.0000 Set Lockcase Rp. 347,200.00 Rp. 694,400.00
2.0000 Set Double Cylinder Rp. 242,700.00 Rp. 485,400.00
2.0000 Set Escutcheon Rp. 132,700.00 Rp. 265,400.00
3.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 480,000.00
Jumlah Rp. 11,008,640.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 11,008,600.00

144 Anal. Pasangan Pintu Type PD 4/ Unit


Bahan + 8.8000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 1,248,720.00
Upah 5.6500 M' Daun Pintu Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 836,200.00
4.8000 M' Daun Jendela Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 710,400.00
2.9400 M2 Panel Multipleks mm + HPL Rp. 1,200,000.00 Rp. 3,528,000.00
13.2300 M2 Kaca Buram Tebal 8 mm Rp. 168,500.00 Rp. 2,229,255.00
20.9000 M' Karet Kaca Rp. 2,000.00 Rp. 41,800.00
1.0000 Set Pull Handle Rp. 291,500.00 Rp. 291,500.00
2.0000 Set Lockcase Rp. 347,200.00 Rp. 694,400.00
2.0000 Set Double Cylinder Rp. 242,700.00 Rp. 485,400.00
2.0000 Set Escutcheon Rp. 132,700.00 Rp. 265,400.00
1.0000 Set Engsel Casement /Friction Stay Dekkson FS S/S 20" Rp. 521,800.00 Rp. 521,800.00
1.0000 Set Handle Casement /Dekkson CH 425 R/H NA Rp. 47,400.00 Rp. 47,400.00
6.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 960,000.00
Jumlah Rp. 11,860,275.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 11,860,200.00

145 Anal. Pasangan Pintu Type PD 5/ Unit


Bahan + 12.2000 M' Kusen Aluminium Color Anodized 3" Rp. 141,900.00 Rp. 1,731,180.00
Upah 5.8500 M' Daun Pintu Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 865,800.00
9.6000 M' Daun Jendela Aluminium Color Anodized 4" Rp. 148,000.00 Rp. 1,420,800.00
3.1500 M2 Panel Multipleks mm + HPL Rp. 1,200,000.00 Rp. 3,780,000.00
5.0500 M2 Kaca Buram Tebal 8 mm Rp. 168,500.00 Rp. 850,925.00
10.1000 M' Karet Kaca Rp. 2,000.00 Rp. 20,200.00
1.0000 Set Pull Handle Rp. 291,500.00 Rp. 291,500.00
2.0000 Set Lockcase Rp. 347,200.00 Rp. 694,400.00
2.0000 Set Double Cylinder Rp. 242,700.00 Rp. 485,400.00
2.0000 Set Escutcheon Rp. 132,700.00 Rp. 265,400.00
2.0000 Set Engsel Casement /Friction Stay Dekkson FS S/S 20" Rp. 521,800.00 Rp. 1,043,600.00
2.0000 Set Handle Casement /Dekkson CH 425 R/H NA Rp. 47,400.00 Rp. 94,800.00
6.0000 Set Hinge Dekkson ESS DL 4X3X2MM 2BB SSS Rp. 160,000.00 Rp. 960,000.00

! 19 dari 26
Jumlah Rp. 12,504,005.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 12,504,000.00

146 1 M2 Anal. Pekerjaan Supply dan Pemasangan Dinding Exterior FCP


Bracket Panel/Bh
0.0196 Bracket Panel 19/19 Rp. 40,000.00 Rp. 784.00
2.0000 Rivet Rp. 100.00 Rp. 200.00
4.0000 Drill Rp. 300.00 Rp. 1,200.00
2.0000 Screw Rp. 650.00 Rp. 1,300.00
Jumlah Rp. 3,484.00

Hollow Aluminium 40 x 40 x 0,6 mm/M'


1.0000 M' Hollow Aluminium 40 x 40 x 0,6 mm
1.0000 Zinchromate Rp. 4,000.00 Rp. 4,000.00
4.0000 Welding Rp. 300.00 Rp. 1,200.00
4.0000 Drill Rp. 300.00 Rp. 1,200.00
4.0000 Screw Rp. 650.00 Rp. 2,600.00
Jumlah Rp. 9,000.00
Steel Bracket/Set
2.0000 Steel Bracket 50/50 Rp. 4,000.00 Rp. 8,000.00
2.0000 Dyna Bolt M10 Rp. 2,650.00 Rp. 5,300.00
8.0000 Drill Rp. 300.00 Rp. 2,400.00
2.0000 Bolt Rp. 850.00 Rp. 1,700.00
Jumlah Rp. 17,400.00
Sealant/M'
1.1000 Sealant Rp. 5,000.00 Rp. 5,500.00
1.0000 Back Up Dia. 15 mm Rp. 1,000.00 Rp. 1,000.00
2.0000 Masking Rp. 400.00 Rp. 800.00
Jumlah Rp. 7,300.00

Pekerjaan Supply dan Pemasangan Fiber Cement Panel /M2


1.2000 M2 Fiber Cement Panel =3 mm setara Kalsiplank 330,000.00 Rp. 396,000.00
12.0000 Bh Bracket All 3,484.00 Rp. 41,808.00
2.0000 M' Hollow Aluminium 40 x 40 x 0.6 mm Galvanis 9,000.00 Rp. 18,000.00
1.0000 Set Steel Bracket 17,400.00 Rp. 17,400.00
2.0000 M' Sealant 7,300.00 Rp. 14,600.00
1.0000 ls alat Bantu 50,000.00 Rp. 50,000.00
Jumlah Rp. 537,808.00
Upah Pasang Rp. 120,000.00 Rp. 537,808.00 657,808.00
Transportasi 0.2000 Rp. 131,561.60
Overhead 0.1000 Rp. 65,780.80
Jumlah Rp. 855,150.40
Total Harga Satuan Pekerjaan Dibulatkan Rp. 855,100.00

L. ANALISA HARGA SATUAN PEKERJAAN FINISHING TANGGA

147 Anal. Finishing Tangga Type 1/ Unit


Bahan 68.0000 M2 Afwerking Beton Rp. 84,200.00 Rp. 5,725,600.00
68.0000 M2 Pengecatan Rp. 44,600.00 Rp. 3,032,800.00
24.8400 M2 Pasangan Lantai 30 x 30 Un Polished Rp. 274,800.00 Rp. 6,826,032.00
48.00 M' Step Nosing Rp. 27,500.00 Rp. 1,320,000.00
16.8000 M2 Railing Besi Rp. 500,000.00 Rp. 8,400,000.00
Jumlah Rp. 25,304,432.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 25,304,400.00

148 Anal. Finishing Tangga Type 2/ Unit


Bahan 80.0000 M2 Afwerking Beton Rp. 84,200.00 Rp. 6,736,000.00
80.0000 M2 Pengecatan Rp. 44,600.00 Rp. 3,568,000.00
37.2600 M2 Pasangan Lantai 30 x 30 Un Polished Rp. 274,800.00 Rp. 10,239,048.00
48.00 M' Step Nosing Rp. 27,500.00 Rp. 1,320,000.00
16.8000 M2 Railing Besi Rp. 500,000.00 Rp. 8,400,000.00
Jumlah Rp. 30,263,048.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 30,263,000.00

149 Anal. Finishing Tangga Type 3/ Unit


Bahan 68.0000 M2 Afwerking Beton Rp. 84,200.00 Rp. 5,725,600.00
68.0000 M2 Pengecatan Rp. 44,600.00 Rp. 3,032,800.00
24.8400 M2 Pasangan Lantai 30 x 30 Un Polished Rp. 274,800.00 Rp. 6,826,032.00
48.00 M' Step Nosing Rp. 27,500.00 Rp. 1,320,000.00
14.2800 M2 Pas. Kaca Tb 8 mm Rp. 140,000.00 Rp. 1,999,200.00
56.0000 Unit Frame + Clamp + Asc Complete Rp. 25,000.00 Rp. 1,400,000.00
16.8000 M2 Railing Besi Rp. 500,000.00 Rp. 8,400,000.00
Jumlah Rp. 28,703,632.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 28,703,600.00

150 Anal. Finishing Tangga Type 4/ Unit


Bahan 80.0000 M2 Afwerking Beton Rp. 84,200.00 Rp. 6,736,000.00
68.0000 M2 Pengecatan Rp. 44,600.00 Rp. 3,032,800.00
37.2600 M2 Pasangan Lantai 30 x 30 Un Polished Rp. 274,800.00 Rp. 10,239,048.00
86.40 M' Step Nosing Rp. 27,500.00 Rp. 2,376,000.00
14.2800 M2 Pas. Kaca Tb 8 mm Rp. 140,000.00 Rp. 1,999,200.00
56.0000 Unit Frame + Clamp + Asc Complete Rp. 25,000.00 Rp. 1,400,000.00
16.8000 M2 Railing Besi Rp. 500,000.00 Rp. 8,400,000.00
Jumlah Rp. 34,183,048.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 34,183,000.00

151 Anal. Finishing Tangga Type 5/ Unit


Bahan 7.2800 M2 Pasangan Bata 1/2 Batu 1: 4 Rp. 84,200.00 Rp. 612,976.00
0.5265 M3 Beton Tumbuk Tebal 5 cm Rp. 44,600.00 Rp. 23,481.90
1.0530 M3 Pasir Urug Tebal 10 cm Rp. 274,800.00 Rp. 289,364.40
15.4700 M2 Pasangan Lantai 60 x 60 Homogeneous Tile Un Polished Rp. 27,500.00 Rp. 425,425.00

! 20 dari 26
18.2000 M' Step Nosing Rp. 500,000.00 Rp. 9,100,000.00
Jumlah Rp. 10,451,247.30
Total Harga Satuan Pekerjaan Dibulatkan Rp. 10,451,200.00

152 Anal. Finishing Tangga Type 6/ Unit


4.5440 M3 Pasangan Aanstampang Rp. 712,200.00 Rp. 3,236,236.80
4.2245 M3 Pondasi Batu Kali 1 : 4 Rp. 1,278,500.00 Rp. 5,401,023.25
Bahan 14.5250 M2 Pasangan Bata 1/2 Batu 1: 4 Rp. 84,200.00 Rp. 1,223,005.00
1.0479 M3 Beton Tumbuk Tebal 5 cm Rp. 44,600.00 Rp. 46,735.23
1.6808 M3 Pasir Urug Tebal 10 cm Rp. 274,800.00 Rp. 461,870.10
27.6675 M2 Pasangan Lantai 60 x 60 Homogeneous Tile Un Polished Rp. 27,500.00 Rp. 760,856.25
46.5000 M' Step Nosing Rp. 500,000.00 Rp. 23,250,000.00
5.7300 M2 Railing Besi Starbus Rp. 500,000.00 Rp. 2,865,000.00
7.0000 M2 Batu Andesit Polos Bakar Uk. 15x30X1.5 cm Rp. 319,900.00 Rp. 2,239,300.00
Jumlah Rp. 39,484,026.63
Total Harga Satuan Pekerjaan Dibulatkan Rp. 39,484,000.00

153 Anal. Finishing Tangga Type 7/ Unit


Bahan 1.00 Unit Tangga Besi Galvanish Rp. 825,000.00 Rp. 825,000.00
Jumlah Rp. 825,000.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 825,000.00

M. ANALISA HARGA SATUAN PEKERJAAN SANITARY

154 Anal. Memasang Dinding Partisi Cubicle Toilet/ Unit


Upah 3.4000 M2 Cubicle Phenolic Rp. 1,760,000.00 Rp. 5,984,000.00
1.6000 M2 Pintu + Door Accessories Rp. 2,695,000.00 Rp. 4,312,000.00
6.0000 Pcs Pedestal 10 cm Stainless Stell Rp. 275,000.00 Rp. 1,650,000.00
Jumlah Rp. 11,946,000.00 Rp. 11,946,000.00
Overhead 0.1000 Rp. 1,194,600.00
Jumlah Rp. 13,140,600.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 13,140,600.00

155 Anal. Memasang Closet Duduk setara TOTO CW 421 J / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.5.1.1.1)
Upah 0.1600 OH Mandor Rp. 100,000.00 Rp. 16,000.00
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
1.1000 OH Tukang Batu Rp. 100,000.00 Rp. 110,000.00
3.3000 OH Pekerja Rp. 75,000.00 Rp. 247,500.00
Bahan 1.0000 Unit Closet Duduk setara TOTO CW 421 J Rp. 2,460,000.00 Rp. 2,460,000.00
0.0600 x Closet Ls Perlengkapan Rp. 147,600.00 Rp. 8,856.00
Jumlah Rp. 375,000.00 Rp. 2,468,856.00 Rp. 2,843,856.00
Overhead 0.1000 Rp. 284,385.60
Jumlah Rp. 3,128,241.60
Total Harga Satuan Pekerjaan Dibulatkan Rp. 3,128,200.00

156 Anal. Memasang Closet Duduk for Disabled setara C704L/SW784JP / Buah
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.5.1.1.1)
Upah 0.1600 OH Mandor Rp. 100,000.00 Rp. 16,000.00
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
1.1000 OH Tukang Batu Rp. 100,000.00 Rp. 110,000.00
3.3000 OH Pekerja Rp. 75,000.00 Rp. 247,500.00
Bahan 1.0000 Unit Closet Duduk for Disabled setara C704L/SW784JP Rp. 3,750,000.00 Rp. 3,750,000.00
0.0600 x Closet Ls Perlengkapan Rp. 225,000.00 Rp. 13,500.00
Jumlah Rp. 375,000.00 Rp. 3,763,500.00 Rp. 4,138,500.00
Overhead 0.1000 Rp. 413,850.00
Jumlah Rp. 4,552,350.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 4,552,300.00

157 Anal. Memasang Closet Jongkok setara TOTO CE9 / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.5.1.1.2)
Upah 0.1600 OH Mandor Rp. 100,000.00 Rp. 16,000.00
0.1500 OH Kepala Tukang Rp. 150,000.00 Rp. 22,500.00
1.5000 OH Tukang Batu Rp. 100,000.00 Rp. 150,000.00
1.0000 OH Pekerja Rp. 75,000.00 Rp. 75,000.00
Bahan 1.0000 Unit Closet Jongkok setara TOTO CE9 Rp. 3,170,000.00 Rp. 3,170,000.00
6.0000 Kg Semen Portland (50 Kg) Rp. 1,900.00 Rp. 11,400.00
0.0100 M3 Pasir Pasang Rp. 366,522.90 Rp. 3,665.23
Jumlah Rp. 263,500.00 Rp. 3,185,065.23 Rp. 3,448,565.23
Overhead 0.1000 Rp. 344,856.52
Jumlah Rp. 3,793,421.75
Total Harga Satuan Pekerjaan Dibulatkan Rp. 3,793,400.00

158 Anal. Memasang Urinoir setara TOTO U 57 / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.5.1.1.4)
0.0500 OH Mandor Rp. 100,000.00 Rp. 5,000.00
0.1000 OH Kepala Tukang Rp. 150,000.00 Rp. 15,000.00
1.0000 OH Tukang Batu Rp. 100,000.00 Rp. 100,000.00
1.0000 OH Pekerja Rp. 75,000.00 Rp. 75,000.00
1.0000 Bh Urinoir setara TOTO U 57 Rp. 2,190,000.00 Rp. 2,190,000.00
6.0000 Kg Semen Portland (50 Kg) Rp. 1,900.00 Rp. 11,400.00
0.0100 M3 Pasir Pasang Rp. 366,522.90 Rp. 3,665.23
0.3000 Hrg Urinoir Perlengkapan Rp. 657,000.00 Rp. 197,100.00
Jumlah Rp. 195,000.00 Rp. 2,402,165.23 Rp. 2,597,165.23
Overhead 0.1000 Rp. 259,716.52
Jumlah Rp. 2,856,881.75
Total Harga Satuan Pekerjaan Dibulatkan Rp. 2,856,800.00

159 Anal. Memasang Jet Washer setara TOTO THX 20 White / Buah
Upah 0.0050 OH Mandor Rp. 100,000.00 Rp. 500.00
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00

! 21 dari 26
0.1000 OH Tukang Batu Rp. 100,000.00 Rp. 10,000.00
0.0100 OH Pekerja Rp. 75,000.00 Rp. 750.00
Bahan 1.0000 Unit Jet Washer setara TOTO THX 20 White Rp. 228,000.00 Rp. 228,000.00
Jumlah Rp. 12,750.00 Rp. 228,000.00 Rp. 240,750.00
Overhead 0.1000 Rp. 24,075.00
Jumlah Rp. 264,825.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 264,800.00

160 Anal. Memasang Washtafel setara Toto LW 230 J Warna Putih / Buah
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.5.1.1.5)
Upah 0.0600 OH Mandor Rp. 100,000.00 Rp. 6,000.00
0.1500 OH Kepala Tukang Rp. 150,000.00 Rp. 22,500.00
1.4500 OH Tukang Batu Rp. 100,000.00 Rp. 145,000.00
1.2000 OH Pekerja Rp. 75,000.00 Rp. 90,000.00
Bahan 1.2000 Unit Washtafel setara Toto LW 230 J Warna Putih Rp. 1,460,000.00 Rp. Rp. 1,752,000.00
6.0000 Kg Semen Portland (50 Kg) Rp. 1,900.00 Rp. 11,400.00
0.0100 M3 Pasir Pasang Rp. 366,522.90 Rp. 3,665.23
0.1200 x Hrg Wastafel Perlengkapan Rp. 175,200.00 Rp. 21,024.00
Jumlah Rp. 263,500.00 Rp. 1,788,089.23 Rp. 2,051,589.23
Overhead 0.1000 Rp. 205,158.92
Jumlah Rp. 2,256,748.15
Total Harga Satuan Pekerjaan Dibulatkan Rp. 2,256,700.00

161 Anal. Memasang Hand Shower setara Toto THX 19 B / Buah


Upah 0.0050 OH Mandor Rp. 100,000.00 Rp. 500.00
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
0.1000 OH Tukang Batu Rp. 100,000.00 Rp. 10,000.00
0.0100 OH Pekerja Rp. 75,000.00 Rp. 750.00
Bahan 1.0000 Bh Hand Shower setara Toto THX 19 B Rp. 292,000.00 Rp. 292,000.00
Jumlah Rp. 12,750.00 Rp. 292,000.00 Rp. 304,750.00
Overhead 0.1000 Rp. 30,475.00
Jumlah Rp. 335,225.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 335,200.00

162 Anal. Memasang Kitchen Sink Royal setara Royal SB 1/ Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.5.1.1.12)
Upah 0.0150 OH Mandor Rp. 100,000.00 Rp. 1,500.00
0.0300 OH Kepala Tukang Rp. 150,000.00 Rp. 4,500.00
0.3000 OH Tukang Batu Rp. 100,000.00 Rp. 30,000.00
0.0300 OH Pekerja Rp. 75,000.00 Rp. 2,250.00
Bahan 1.0000 Unit Kitchen Sink Royal setara Royal SB 1 Rp. 330,000.00 Rp. 330,000.00
1.0000 Bh Water Drain Rp. 23,000.00 Rp. 23,000.00
Jumlah Rp. 38,250.00 Rp. 353,000.00 Rp. 391,250.00
Overhead 0.1000 Rp. 39,125.00
Jumlah Rp. 430,375.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 430,300.00

163 Anal. Memasang Floor Drain setara TOTO TX 1 BN / Buah


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.5.1.1.14)
Upah 0.0050 OH Mandor Rp. 100,000.00 Rp. 500.00
0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
0.1000 OH Tukang Batu Rp. 100,000.00 Rp. 10,000.00
0.0100 OH Pekerja Rp. 75,000.00 Rp. 750.00
Bahan 1.0000 Unit Floor Drain setara TOTO TX 1 BN Rp. 404,000.00 Rp. 404,000.00
Jumlah Rp. 12,750.00 Rp. 404,000.00 Rp. 416,750.00
Overhead 0.1000 Rp. 41,675.00
Jumlah Rp. 458,425.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 458,400.00

164 Anal. Memasang Kran Air setara TOTO Tipe T23 B13 / Buah
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.5.1.1.19)
Upah 0.0050 OH Mandor Rp. 100,000.00 Rp. 500.00
0.0400 OH Kepala Tukang Rp. 150,000.00 Rp. 6,000.00
0.4000 OH Tukang Batu Rp. 100,000.00 Rp. 40,000.00
0.0100 OH Pekerja Rp. 75,000.00 Rp. 750.00
Bahan 1.0000 Bh Kran Air setara TOTO Tipe T23 B13 Rp. 235,000.00 Rp. 235,000.00
0.0250 M' Seal Tape Rp. 3,500.00 Rp. 87.50
Jumlah Rp. 47,250.00 Rp. 235,087.50 Rp. 282,337.50
Overhead 0.1000 Rp. 28,233.75
Jumlah Rp. 310,571.25
Total Harga Satuan Pekerjaan Dibulatkan Rp. 310,500.00

165 Anal. Memasang Kran Dapur setara TOTO TXX 609 K / Buah
(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.5.1.1.19)
Upah 0.0050 OH Mandor Rp. 100,000.00 Rp. 500.00
0.0400 OH Kepala Tukang Rp. 150,000.00 Rp. 6,000.00
0.4000 OH Tukang Batu Rp. 100,000.00 Rp. 40,000.00
0.0100 OH Pekerja Rp. 75,000.00 Rp. 750.00
Bahan 1.0000 Bh Kran Dapur setara TOTO TXX 609 K Rp. 400,000.00 Rp. 400,000.00
0.0250 Bh Seal Tape Rp. 3,500.00 Rp. 87.50
Jumlah Rp. 47,250.00 Rp. 400,087.50 Rp. 447,337.50
Overhead 0.1000 Rp. 44,733.75
Jumlah Rp. 492,071.25
Total Harga Satuan Pekerjaan Dibulatkan Rp. 492,000.00

166 Anal. Memasang Paper Holder setara TOTO S 20 / Buah


Upah 0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
1.1000 OH Tukang Batu Rp. 100,000.00 Rp. 110,000.00
Bahan 1.0000 Bh Paper Holder setara TOTO S 20 Rp. 280,000.00 Rp. 280,000.00
Jumlah Rp. 111,500.00 Rp. 280,000.00 Rp. 391,500.00
Overhead 0.1000 Jumlah Rp. 39,150.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 430,650.00

! 22 dari 26
167 Anal. Memasang Towel Holder setara TOTO TX 701 AEZ / Buah
Upah 0.0100 OH Kepala Tukang Rp. 150,000.00 Rp. 1,500.00
1.1000 OH Tukang Batu Rp. 100,000.00 Rp. 110,000.00
Bahan 1.0000 Bh Towel Holder setara TOTO TX 701 AEZ Rp. 521,000.00 Rp. 521,000.00
Jumlah Rp. 111,500.00 Rp. 521,000.00 Rp. 632,500.00
Overhead 0.1000 Jumlah Rp. 63,250.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 695,750.00

168 Anal. Memasang Sekat Urinoir setara TOTO A 100/ Buah


0.0500 OH Mandor Rp. 100,000.00 Rp. 5,000.00
0.1000 OH Kepala Tukang Rp. 150,000.00 Rp. 15,000.00
1.0000 OH Tukang Batu Rp. 100,000.00 Rp. 100,000.00
1.0000 OH Pekerja Rp. 75,000.00 Rp. 75,000.00
Bahan 1.0000 Bh Sekat Urinoir setara TOTO A 100 Rp. 1,180,000.00 Rp. 1,180,000.00
6.0000 Kg Semen Portland (50 Kg) Rp. 1,900.00 Rp. 11,400.00
0.0100 M3 Pasir Pasang Rp. 366,522.90 Rp. 3,665.23
0.1000 Hrg Sekat Perlengkapan Rp. 118,000.00 Rp. 11,800.00
Jumlah Rp. 195,000.00 Rp. 1,206,865.23 Rp. 1,401,865.23
Overhead 0.1000 Jumlah Rp. 140,186.52
Total Harga Satuan Pekerjaan Dibulatkan Rp. 1,542,051.75

169 Anal. Memasang Hand Rail Toilet Disable/ M'


Upah 0.0050 OH Mandor Rp. 100,000.00 Rp. 500.00
0.0180 OH Kepala Tukang Rp. 150,000.00 Rp. 2,700.00
0.1800 OH Tukang Batu Rp. 100,000.00 Rp. 18,000.00
0.1080 OH Pekerja Rp. 75,000.00 Rp. 8,100.00
Bahan 1.2000 M' Pipa Stainless Stell Dia. 2" Rp. 34,166.67 Rp. 41,000.00
0.3500 Hrg Bhn Perlengkapan Rp. 11,958.33 Rp. 4,185.42
Jumlah Rp. 29,300.00 Rp. 45,185.42 Rp. 74,485.42
Overhead 0.1000 Rp. 7,448.54
Jumlah Rp. 81,933.96
Total Harga Satuan Pekerjaan Dibulatkan Rp. 81,900.00

170 1 Unit Anal. Meja Wastafel Tebal 8 cm , Uk 65 x 450


Bahan
0.3250 M3 Stamp Beton K225 Rp. 1,515,400.00 Rp. 492,505.00
110.0000 Kg Anal. Besi Rp. 21,600.00 Rp. 2,376,000.00
3.2500 M2 Begisting Rp. 339,500.00 Rp. 1,103,375.00
3.2500 M2 Granite Hitam 65 x 500 Rp. 331,800.00 Rp. 1,078,350.00
Jumlah Rp. 5,050,230.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 5,050,200.00

171 1 Unit Anal. Meja Pantry Tebal 10 cm , Uk. 65 x 600


Bahan
0.3900 M3 Stamp Beton K225 Rp. 1,515,400.00 Rp. 591,006.00
110.0000 Kg Anal. Besi Rp. 21,600.00 Rp. 2,376,000.00
3.9000 M2 Begisting Rp. 339,500.00 Rp. 1,324,050.00
4.2250 M2 Granite Hitam 65 x 600 Rp. 331,800.00 Rp. 1,401,855.00
Jumlah Rp. 5,692,911.00
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 5,692,900.00

172 Anal. Memasang Pipa Stainless Dia. 3"


Upah 0.0050 OH Mandor Rp. 100,000.00 Rp. 500.00
0.0180 OH Kepala Tukang Rp. 150,000.00 Rp. 2,700.00
0.1800 OH Tukang Batu Rp. 100,000.00 Rp. 18,000.00
0.1080 OH Pekerja Rp. 75,000.00 Rp. 8,100.00
Bahan 1.2000 M' Pipa Stainless Stell 3" Rp. 51,666.67 Rp. 62,000.00
0.3500 Hrg Bhn Perlengkapan Rp. 18,083.33 Rp. 6,329.17
Jumlah Rp. 29,300.00 Rp. 68,329.17 Rp. 97,629.17
Overhead 0.1000 Rp. 9,762.92
Jumlah Rp. 107,392.08
Total Harga Satuan Pekerjaan Dibulatkan Rp. 107,300.00

N. ANALISA HARGA SATUAN PEKERJAAN ATAP

173 1 M2 Anal. Memasang Atap Bitumen setara Onduline


Upah 0.0100 OH Mandor Rp. 100,000.00 1,000.00
0.0030 OH Kepala Tukang Rp. 150,000.00 450.00
0.3000 OH Tukang Rp. 100,000.00 30,000.00
0.2000 OH Pekerja Rp. 75,000.00 15,000.00
Bahan 1.2000 M2 Atap Bitumen setara Gutta Rp. 73,684.21 Rp. 88,421.05
8.0000 Pcs Sekrup Rp. 1,000.00 Rp. 8,000.00
Jumlah Rp. 46,450.00 Rp. 96,421.05 Rp. 142,871.05
Overhead 0.1000 Rp. 14,287.11
Jumlah Rp. 157,158.16
Total Harga Satuan Pekerjaan Dibulatkan Rp. 157,100.00

172 1 m² Anal. Memasang Bituminous Roofing File setara Onduline


0.2500 Bhn Upah Pasang Rp. 44,000.00 11,000.00
1.2000 M2 Bituminous Roofing File Setara Onduline Rp. 140,000.00 168,000.00
8.0000 Pcs Sekrup Hexagonal Safe Top Setara Onduline Rp. 1,000.00 8,000.00
Jumlah Rp. 11,000.00 Rp. 176,000.00 Rp. 187,000.00
Overhead 0.1000 Rp. 18,700.00
Jumlah Rp. 205,700.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 205,700.00

173 1 m Anal. Memasang Nok/Bubungan setara Onduline


0.2500 Bhn Upah Pasang Rp. 27,380.00 6,845.00
1.2440 Lbr Bubungan Celulosa Bitument setara Onduline Rp. 80,000.00 99,520.00
10.0000 Pcs Sekrup setara Onduline (70xØ3,55 mm) Rp. 1,000.00 10,000.00
Jumlah Rp. 6,845.00 Rp. 109,520.00 Rp. 116,365.00

! 23 dari 26
Overhead 0.1000 Rp. 11,636.50
Jumlah Rp. 128,001.50
Total Harga Satuan Pekerjaan Dibulatkan Rp. 128,000.00

174 1 m Anal. Memasang Wall Flashing


0.2500 Bhn Upah Pasang Rp. 21,113.14 5,278.28
1.0500 Lbr Flashing setara Onduline Rp. 80,000.00 84,000.00
0.0200 Kg Paku Tembok Rp. 22,627.00 452.54
Jumlah Rp. 5,278.28 Rp. 84,452.54 Rp. 89,730.82
0.1000 Overhead Rp. 8,973.08
Jumlah Rp. 98,703.91
Dibulatkan Rp. 98,700.00

175 1 M2 Anal. Memasang Lapisan Aluminium Foil


Upah 0.0800 OH Mandor Rp. 150,000.00 12,000.00
0.0500 OH Kepala Tukang Rp. 150,000.00 7,500.00
0.0500 OH Tukang Kayu Rp. 100,000.00 5,000.00
0.1500 OH Pekerja Rp. 75,000.00 11,250.00
Bahan 1.2000 M2 Sisalation/ Alumnium Foil Rp. 45,000.00 Rp. 54,000.00
1.0000 Set Alat Bantu Rp. 5,000.00 Rp. 5,000.00
Jumlah Rp. 35,750.00 Rp. 59,000.00 Rp. 94,750.00
Overhead 0.1000 Rp. 9,475.00
Jumlah Rp. 104,225.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 104,200.00

176 1 M' Anal. Listplank GRC Board, Lebar 30 cm, Tebal 9 mm


(Lamp. 4 Permen PU RI No. 11/PRT/M/2013 - Analisa A.4.6.1.22)
Upah 0.2000 OH Tukang Kayu Rp. 100,000.00 Rp. 20,000.00
0.0200 OH Kepala Tukang Rp. 150,000.00 Rp. 3,000.00
0.1000 OH Pekerja Rp. 75,000.00 Rp. 7,500.00
0.0050 OH Mandor Rp. 100,000.00 Rp. 500.00
Bahan 0.0110 M2 Listplank GRC Board Tebal 9 mm Rp. 48,710.02 Rp. 535.81
0.0500 Kg Paku Rp. 22,627.00 Rp. 1,131.35
Jumlah Rp. 31,000.00 Rp. 1,667.16 Rp. 32,667.16
Overhead 0.1000 Rp. 3,266.72
Jumlah Rp. 35,933.88
Total Harga Satuan Pekerjaan Dibulatkan Rp. 35,900.00

O. ANALISA HARGA SATUAN PEKERJAAN LANDSCAPE

177 Anal. Pemasangan Paving Block Warna Tebal 8 cm Type Hexagon K-225 / M2
Upah 0.2500 OH Pekerja Rp. 75,000.00 Rp. 18,750.00
0.0500 OH Tukang Batu Rp. 100,000.00 Rp. 5,000.00
0.0250 OH Kepala Tukang Rp. 150,000.00 Rp. 3,750.00
0.0030 OH Mandor Rp. 100,000.00 Rp. 300.00
Bahan 0.2000 m³ Pasir Urug Rp. 195,500.00 Rp. 39,100.00
25.0000 Bh Paving Block Tebal 8 cm Type Hexagon Rp. 2,600.00 Rp. 65,000.00
Jumlah Rp. 27,800.00 Rp. 104,100.00 Rp. 131,900.00
Overhead 0.1000 Rp. 13,190.00
Jumlah Rp. 145,090.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 145,000.00

178 1 Bh Anal. Pemasangan Kanstein Uk. 21.30.60


Upah 0.1500 OH Pekerja Rp. 75,000.00 Rp. 11,250.00
0.0500 OH Tukang Batu Rp. 100,000.00 Rp. 5,000.00
0.0250 OH Mandor Rp. 100,000.00 Rp. 2,500.00
Bahan 0.0250 OH Pasir Pasang Rp. 366,522.90 Rp. 9,163.07
3.3000 Kg Portlant Cement Rp. 1,900.00 Rp. 6,270.00
1.0000 Bh Kanstein Uk. 40.20.10 Rp. 19,000.00 Rp. 19,000.00
Jumlah Rp. 18,750.00 Rp. 34,433.07 Rp. 53,183.07
Overhead 0.1000 Rp. 5,318.31
Jumlah Rp. 58,501.38
Total Harga Satuan Pekerjaan Dibulatkan Rp. 58,500.00

179 1 M' Anal. Memasang Grill Penutup Saluran


Upah 0.0600 Tukang Batu Rp. 100,000.00 Rp. 6,000.00
0.0360 Pekerja Rp. 75,000.00 Rp. 2,700.00
Bahan 1.1000 m' Grill Penutup Saluran Rp. 185,000.00 Rp. 203,500.00
1.0000 Alat Bantu Rp. 5,000.00 Rp. 5,000.00
Jumlah Rp. 8,700.00 Rp. 208,500.00 Rp. 217,200.00
Overhead 0.1000 Rp. 21,720.00
Total Harga Satuan Pekerjaan Rp. 238,920.00

180 1 M3 Anal. Urugan Tanah Subur


Upah 0.2000 OH Pekerja Terlatih Rp. 75,000.00 Rp. 15,000.00
Bahan 1.0000 M³ Tanah Subur Rp. 137,000.00 Rp. 137,000.00
Jumlah Rp. 15,000.00 Rp. 137,000.00 Rp. 152,000.00
Overhead 0.1000 Rp. 15,200.00
Jumlah Rp. 167,200.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 167,200.00
Harga upah /hari = Rp 65.000,-/5 M3/ hari

181 1 M3 Anal. Urugan Pupuk


Upah 0.0667 OH Pekerja Terlatih Rp. 75,000.00 Rp. 5,000.00
Bahan 1.0000 M³ Pupuk Rp. 336,000.00 Rp. 336,000.00
Jumlah Rp. 5,000.00 Rp. 336,000.00 Rp. 341,000.00
Overhead 0.1000 Rp. 34,100.00
Jumlah Rp. 375,100.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 375,100.00
Harga upah /hari = Rp 65.000,-/300 m²/ hari

! 24 dari 26
182 1 M2 Anal. Pembentukan dan Pengolahan Tanah
Upah 0.0333 OH Pekerja Terlatih Rp. 75,000.00 Rp. 2,500.00
Jumlah Rp. 2,500.00 Rp. Rp. 2,500.00
Overhead 0.1000 Rp. 250.00
Jumlah Rp. 2,750.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 2,700.00
Harga upah /hari = Rp 65.000,-/30 m²/ hari

183 1 Titik Anal Pekerjaan Lubang Tanam


Upah 0.2000 OH Pekerja Terlatih Rp. 75,000.00 Rp. 15,000.00
Jumlah Rp. 15,000.00 Rp. Rp. 15,000.00
Overhead 0.1000 Rp. 1,500.00
Jumlah Rp. 16,500.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 16,500.00
Harga upah /hari = Rp 65.000,-/5 Titik / hari

184 1 Batang Anal. Pohon Ketapang Kencana (Varigata), T= 3-4 m


Upah 0.1000 OH Pekerja Terlatih Rp. 75,000.00 Rp. 7,500.00
0.0333 Upah Angkut/transport Rp. 200,000.00 Rp. 6,666.67
Bahan 1.0000 Btg Ketapang Kencana (Varigata), T= 4 m Rp. 275,000.00 Rp. 275,000.00
Jumlah Rp. 14,166.67 Rp. 275,000.00 Rp. 289,166.67
Overhead 0.1000 Rp. 28,916.67
Jumlah Rp. 318,083.33
Total Harga Satuan Pekerjaan Dibulatkan Rp. 318,000.00
Harga upah /hari = Rp 65.000,-
Kemampaun tanam pohon/hari = 10 phn/hr
Kemampuan angkut pohon = 30 phn /truk engkle
Harga kirim = Rp.500.000/truk engkle

185 1 Batang Anal. Pohon Palem Ekor Tupai (Wodyetia Bifurcata), T = 2,5 m
Upah 0.1000 OH Pekerja Terlatih Rp. 75,000.00 Rp. 7,500.00
0.0333 Upah Angkut/transport Rp. 200,000.00 Rp. 6,666.67
Bahan 1.0000 Btg Palem Ekor Tupai (Wodyetia Bifurcata), T = 3 m Rp. 450,000.00 Rp. 450,000.00
Jumlah Rp. 14,166.67 Rp. 450,000.00 Rp. 464,166.67
Overhead 0.1000 Rp. 46,416.67
Jumlah Rp. 510,583.33
Total Harga Satuan Pekerjaan Dibulatkan Rp. 510,500.00
Harga upah /hari = Rp 65.000,-
Kemampaun tanam pohon/hari = 10 phn/hr
Kemampuan angkut pohon = 30 phn /truk engkle
Harga kirim = Rp.500.000/truk engkle

186 1 Batang Anal. Pohon Palem Sikas (Encephalartos Horridus), T = 1 m


Upah 0.1000 OH Pekerja Terlatih Rp. 75,000.00 Rp. 7,500.00
0.0333 Upah Angkut/transport Rp. 200,000.00 Rp. 6,666.67
Bahan 1.0000 Btg Palem Sikas (Encephalartos Horridus), T = 1 m Rp. 150,000.00 Rp. 150,000.00
Jumlah Rp. 14,166.67 Rp. 150,000.00 Rp. 164,166.67
Overhead 0.1000 Rp. 16,416.67
Jumlah Rp. 180,583.33
Total Harga Satuan Pekerjaan Dibulatkan Rp. 180,500.00
Harga upah /hari = Rp 65.000,-
Kemampaun tanam pohon/hari = 10 phn/hr
Kemampuan angkut pohon = 30 phn /truk engkle
Harga kirim = Rp.500.000/truk engkle

187 1 Batang Anal. Pohon Biola Cantik (Ficus Lyrata), T = 3 m


Upah 0.1000 OH Pekerja Terlatih Rp. 75,000.00 Rp. 7,500.00
0.0333 Upah Angkut/transport Rp. 200,000.00 Rp. 6,666.67
Bahan 1.0000 Btg Biola Cantik (Ficus Lyrata), T = 3 m Rp. 250,000.00 Rp. 250,000.00
Jumlah Rp. 14,166.67 Rp. 250,000.00 Rp. 264,166.67
Overhead 0.1000 Rp. 26,416.67
Jumlah Rp. 290,583.33
Total Harga Satuan Pekerjaan Dibulatkan Rp. 290,500.00
Harga upah /hari = Rp 65.000,-
Kemampaun tanam pohon/hari = 10 phn/hr
Kemampuan angkut pohon = 30 phn /truk engkle
Harga kirim = Rp.500.000/truk engkle

188 1 Batang Anal. Bunga Puring Apel, T = 40-50 cm


Upah 0.0500 OH Pekerja Terlatih Rp. 75,000.00 Rp. 3,750.00
0.0200 Upah Angkut/transport Rp. 200,000.00 Rp. 4,000.00
Bahan 1.0000 Btg Bunga Puding Apel Rp. 30,000.00 Rp. 30,000.00
Rp. 7,750.00 Rp. 30,000.00 Rp. 43,377.50
Overhead 0.1000 Rp. 4,337.75
Jumlah Rp. 47,715.25
Total Harga Satuan Pekerjaan Dibulatkan Rp. 47,700.00
Harga upah /hari = Rp 65.000,-
Kemampuan tanam bunga/hari = 20/hr
Kemampuan angkut bunga = 50 bunga /truk engkle
Harga kirim = Rp.500.000/truk engkle

189 1 Batang Anal. Perdu Melati Mini Golden (Gardenia Mini), T = 60 cm


Upah 0.1000 OH Pekerja Terlatih Rp. 75,000.00 Rp. 7,500.00
0.0333 Upah Angkut/transport Rp. 200,000.00 Rp. 6,666.67
Bahan 1.0000 Btg Melati Mini Golden (Gardenia Mini), T = 60 cm Rp. 12,500.00 Rp. 12,500.00
Jumlah Rp. 14,166.67 Rp. 12,500.00 Rp. 26,666.67
Overhead 0.1000 Rp. 2,666.67
Jumlah Rp. 29,333.33
Total Harga Satuan Pekerjaan Dibulatkan Rp. 29,300.00
Harga upah /hari = Rp 65.000,-

! 25 dari 26
Kemampaun tanam pohon/hari = 10 phn/hr
Kemampuan angkut pohon = 30 phn /truk engkle
Harga kirim = Rp.500.000/truk engkle

190 1 Batang Anal. Bunga Sambang Dara, T = 30-40 cm


Upah 0.050 OH Pekerja Terlatih Rp. 75,000.00 Rp. 3,750.00
0.020 Upah Angkut/transport Rp. 200,000.00 Rp. 4,000.00
Bahan 1.000 Btg Bunga Sambang Dara Rp. 17,500.00 Rp. 17,500.00
Rp. 7,750.00 Rp. 17,500.00 Rp. 30,877.50
Overhead 0.100 Rp. 3,087.75
Jumlah Rp. 33,965.25
Total Harga Satuan Pekerjaan Dibulatkan Rp. 33,900.00
Harga upah /hari = Rp 65.000,-
Kemampaun tanam pohon/hari = 10 phn/hr
Kemampuan angkut pohon = 30 phn /truk engkle
Harga kirim = Rp.500.000/truk engkle

191 1 Batang Anal. Pohon Lili Brasil (Dianella Tasmanica)


Upah 0.1000 OH Pekerja Terlatih Rp. 75,000.00 Rp. 7,500.00
0.0333 Upah Angkut/transport Rp. 500,000.00 Rp. 16,666.67
Bahan 1.0000 Btg Lili Brasil (Dianella Tasmanica), T = 40 cm Rp. 3,000.00 Rp. 3,000.00
Jumlah Rp. 24,166.67 Rp. 3,000.00 Rp. 27,166.67
Overhead 0.1000 Rp. 2,716.67
Total Harga Satuan Pekerjaan Rp. 29,883.33
Harga upah /hari = Rp 65.000,-
Kemampaun tanam pohon/hari = 10 phn/hr
Kemampuan angkut pohon = 30 phn /truk engkle
Harga kirim = Rp.500.000/truk engkle

192 1 Batang Anal. Perdu Bunga Asoka (Saraca Asoca), T = 50 cm


Upah 0.1000 OH Pekerja Terlatih Rp. 75,000.00 Rp. 7,500.00
0.0333 Upah Angkut/transport Rp. 500,000.00 Rp. 16,666.67
Bahan 1.0000 Btg Bunga Asoka (Saraca Asoca), T = 1 m Rp. 12,500.00 Rp. 12,500.00
Jumlah Rp. 24,166.67 Rp. 12,500.00 Rp. 36,666.67
Overhead 0.1000 Rp. 3,666.67
Total Harga Satuan Pekerjaan Rp. 40,333.33
Harga upah /hari = Rp 65.000,-
Kemampaun tanam pohon/hari = 10 phn/hr
Kemampuan angkut pohon = 30 phn /truk engkle
Harga kirim = Rp.500.000/truk engkle

193 1 Batang Anal. Perdu Bawang-bawangan (Zephyranthes)


Upah 0.1000 OH Pekerja Terlatih Rp. 75,000.00 Rp. 7,500.00
0.0333 Upah Angkut/transport Rp. 500,000.00 Rp. 16,666.67
Bahan 1.0000 Btg Bawang-bawangan (Zephyranthes), T = 40 cm Rp. 10,000.00 Rp. 10,000.00
Jumlah Rp. 24,166.67 Rp. 10,000.00 Rp. 34,166.67
Overhead 0.1000 Rp. 3,416.67
Jumlah Rp. 37,583.33
Total Harga Satuan Pekerjaan Dibulatkan Rp. 37,500.00
Harga upah /hari = Rp 65.000,-
Kemampaun tanam pohon/hari = 10 phn/hr
Kemampuan angkut pohon = 30 phn /truk engkle
Harga kirim = Rp.500.000/truk engkle

194 1 M² Anal. Rumput Gajah Mini (Pennisetum Purperium Schamach)


Upah 0.0200 OH Pekerja Terlatih Rp. 75,000.00 Rp. 1,500.00
0.0050 Upah Angkut/transport Rp. 200,000.00 Rp. 1,000.00
Bahan 1.0000 Btg Rumput Gajah Mini Rp. 35,000.00 Rp. 35,000.00
Jumlah Rp. 2,500.00 Rp. 35,000.00 Rp. 37,500.00
Overhead 0.1000 Rp. 3,750.00
Jumlah Rp. 41,250.00
Total Harga Satuan Pekerjaan Dibulatkan Rp. 41,200.00
Harga upah /hari = Rp 65.000,-/50 M2/ hari
Kemampuan angkut rumput = 200 m2/truk engkle
Harga kirim = Rp.500.000/truk engkle

Padang, Desember 2016

Konsultan Perencana
CV. DINAMIKA CIPTA CONSULTANT

EZY ESA LONA, ST


Direktur

! 26 dari 26
ANALISA SUPLEMEN PEK. ARSITEKTUR

KEGIATAN : PERENCANAAN GEDUNG


PEKERJAAN : PERENCANAAN DED KANTIN TEKNIK SIPIL
LOKASI : KAMPUS UNAND LIMAU MANIS PADANG
THN.ANGG. : 2016

NO. URAIAN HARGA SATUAN UPAH BAHAN JUMLAH

1 2 3 4 5 6

A. ANALISA HARGA SATUAN PEKERJAAN BETON K-175 dan K225


195 1 M3 Anal. Sloof 15x20 K-175
Bahan 1.0000 M3 Anal. Beton K- 175 Lt. 1 Rp. 1,433,100.00 Rp. 1,433,100.00
13.3333 M2 Anal. Papan Bekisting Sloof Rp. 97,400.00 Rp. 1,298,666.67
149.1474 Kg Anal. Besi Rangka Rp. 21,600.00 Rp. 3,221,583.03
Jumlah Rp. 5,953,349.70
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 5,953,300.00

196 1 M3 Anal. Kolom Praktis 13x13 K-175 Lt. 1


Bahan 1.0000 M3 Anal. Beton K- 175 Lt. 1 Rp. 1,433,100.00 Rp. 1,433,100.00
30.7692 M2 Anal. Papan Bekisting Kolom Lt. 1 Rp. 217,600.00 Rp. 6,695,384.62
213.6300 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 4,614,407.32
Jumlah Rp. 12,742,891.94
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 12,742,800.00

197 1 M3 Anal. Kolom Praktis 13x13 K-175 Lt. 2


Bahan 1.0000 M3 Anal. Beton K- 175 Lt. 2 Rp. 1,449,300.00 Rp. 1,449,300.00
30.7692 M2 Anal. Papan Bekisting Kolom Lt. 2 Rp. 222,100.00 Rp. 6,833,846.15
213.6300 Kg Anal. Besi Rangka Lt. 2 Rp. 21,600.00 Rp. 4,614,407.32
Jumlah Rp. 12,897,553.48
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 12,897,500.00

198 1 M3 Anal. Balok Praktis 13x18 K-175 Lt. 1


Bahan 1.0000 M3 Anal. Beton K- 175 Lt. 1 Rp. 1,433,100.00 Rp. 1,433,100.00
20.94 M2 Anal. Papan Bekisting Balok Lt. 1 Rp. 217,600.00 Rp. 4,556,581.20
164.17 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 3,546,159.60
Jumlah Rp. 9,535,840.79
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 9,535,800.00

199 1 M3 Anal. Balok Praktis 13x18 K-175 Lt. 2


Bahan 1.0000 M3 Anal. Beton K- 175 Lt. 2 Rp. 1,449,300.00 Rp. 1,449,300.00
20.9402 M2 Anal. Papan Bekisting Balok Lt. 2 Rp. 222,100.00 Rp. 4,650,811.97
164.17 Kg Anal. Besi Rangka Lt. 2 Rp. 21,600.00 Rp. 3,546,159.60
Jumlah Rp. 9,646,271.56
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 9,646,200.00

199 1 M3 Anal. Pet Tebal 10 cm K-225


Bahan 1.0000 M3 Anal. Beton K- 225 Lt. 1 Rp. 1,515,400.00 Rp. 1,515,400.00
11.88 M2 Anal. Papan Bekisting Plat Lt. 1 Rp. 339,500.00 Rp. 4,032,141.30
126.19 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 2,725,757.38
Jumlah Rp. 8,273,298.68
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 8,273,200.00

200 1 Unit Anal. Pondasi Sumuran Dia 1.20 , H : 3 Cincin


Upah 1.227 M3 Pek. Galian Pondasi Sumuran 1m' Pertama Rp. 64,600.00 Rp. 79,235.94 Rp.
+ 1.227 M3 Pek. Galian Pondasi Sumuran 1m' Kedua Rp. 79,200.00 Rp. 97,143.75 Rp.
Bahan 1.227 M3 Pek. Galian Pondasi Sumuran 1m' Ketiga Rp. 93,900.00 Rp. 115,174.22 Rp.
0.542 M3 Pek. Cincin Sumuran Tb 10 cm, K-225 Rp. 1,515,481.55 Rp. 820,860.58
6.908 M2 Pek. Cetakan / Begisting Rp. 97,400.00 Rp. 672,839.20
0.150 Anl Cs Upah Penurunan Cinicn Pertama Rp. 9,690.00 Rp. 1,453.50
0.200 Anl Cs Upah Penurunan Cinicn Kedua Rp. 15,840.00 Rp. 3,168.00
0.300 Anl Cs Upah Penurunan Cinicn Ketiga Rp. 28,170.00 Rp. 8,451.00
0.314 M3 Beton Kedap Air 1:2:3 Rp. 1,433,100.00 Rp. 449,993.40
2.185 M3 Beton Siklop 60% Beton 1Pc : 2Ps : 3Kr + 40% Bt kali Rp. 1,176,400.00 Rp. 2,570,028.14
100.000 Kg Pek. Anl . Besi + Stek Poer Rp. 21,600.00 Rp. 2,160,000.00
Rp. 304,626.41 Rp. 6,673,721.32
Jumlah Rp. 6,673,721.32
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 6,673,700.00

201 1 M3 Anal. Pile Cap 160x160x 40 cm K-250, U-39


Bahan 1.0000 M3 Anal. Beton K- 250 Lt. 1 Rp. 1,538,200.00 Rp. 1,538,200.00
3.3333 M2 Anal. Papan Bekisting Pondasi Rp. 97,400.00 Rp. 324,666.67
289.8701 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 6,261,193.73
Jumlah Rp. 8,124,060.39
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 8,124,000.00

202 1 M3 Anal. S1 Sloof 30x45 cm, K-250, U-39


Bahan 1.0000 M3 Anal. Beton K- 250 Lt. 1 Rp. 1,538,200.00 Rp. 1,538,200.00
8.6667 M2 Anal. Papan Bekisting Sloof Rp. 208,275.76 Rp. 1,805,056.59
237.3525 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 5,126,814.00
Jumlah Rp. 8,470,070.59
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 8,470,000.00

203 1 M3 Anal. K1 Kolom Dia 50 cm, K-250, U-39


Bahan 1.0000 M3 Anal. Beton K- 250 Lt. 1 Rp. 1,538,200.00 Rp. 1,538,200.00
8.0000 M2 Anal. Papan Bekisting Kolom Lt. 1 Rp. 217,600.00 Rp. 1,740,800.00
222.2042 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 4,799,609.99
Jumlah Rp. 8,078,609.99
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 8,078,600.00
204 1 M3 Anal. B1 Balok 30x50 cm, K-250, U-39

! 1 dari 2
Bahan 1.0000 M3 Anal. Beton K- 250 Lt. 1 Rp. 1,538,200.00 Rp. 1,538,200.00
6.0000 M2 Anal. Papan Bekisting Balok Lt. 1 Rp. 222,400.00 Rp. 1,334,400.00
200.0000 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 4,320,000.00
Jumlah Rp. 7,192,600.00
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 7,192,600.00

205 1 M3 Anal. B2 Balok Anak 25x35 cm, K-250, U-39


Bahan 1.0000 M3 Anal. Beton K- 250 Lt. 1 Rp. 1,538,200.00 Rp. 1,538,200.00
8.0000 M2 Anal. Papan Bekisting Balok Lt. 1 Rp. 222,400.00 Rp. 1,779,200.00
200.0000 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 4,320,000.00
Jumlah Rp. 7,637,400.00
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 7,637,400.00

206 1 M3 Anal. Plat Lantai tb 12 cm, K-250, U-39


Bahan 1.0000 M3 Anal. Beton K- 250 Lt. 1 Rp. 1,538,200.00 Rp. 1,538,200.00
10.0000 M2 Anal. Papan Bekisting Plat Lt. 1 Rp. 339,500.00 Rp. 3,395,000.00
110.0000 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 2,376,000.00
Jumlah Rp. 7,309,200.00
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 7,309,200.00

207 1 M3 Anal. Listplank Beton tb 10 cm, K-250, U-39


Bahan 1.0000 M3 Anal. Beton K- 250 Lt. 1 Rp. 1,538,200.00 Rp. 1,538,200.00
8.0000 M2 Anal. Papan Bekisting Plat Lt. 1 Rp. 339,500.00 Rp. 2,716,000.00
125.0000 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 2,700,000.00
Jumlah Rp. 6,954,200.00
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 6,954,200.00

208 1 M3 Anal. Pondasi Plat cm, K-250, U-39


Bahan 1.0000 M3 Anal. Beton K- 250 Lt. 1 Rp. 1,538,200.00 Rp. 1,538,200.00
4.0000 M2 Anal. Papan Bekisting Plat Lt. 1 Rp. 339,500.00 Rp. 1,358,000.00
115.0000 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 2,484,000.00
Jumlah Rp. 5,380,200.00
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 5,380,200.00

209 1 M3 Anal. Kolom L 20x40x15 cm, K-250, U-39


Bahan 1.0000 M3 Anal. Beton K- 250 Lt. 1 Rp. 1,538,200.00 Rp. 1,538,200.00
12.0000 M2 Anal. Papan Bekisting Kolol Lt. 1 Rp. 217,600.00 Rp. 2,611,200.00
189.0000 Kg Anal. Besi Rangka Lt. 1 Rp. 21,600.00 Rp. 4,082,400.00
Jumlah Rp. 8,231,800.00
Total Harga Satuan Pekerjaan Jumlah Dibulatkan Rp. 8,231,800.00

! 2 dari 2
DAFTAR HARGA SATUAN PEKERJAAN ARSITEKTUR

KEGIATAN : PERENCANAAN GEDUNG


PEKERJAAN : PERENCANAAN DED KANTIN TEKNIK SIPIL
LOKASI : KAMPUS UNAND LIMAU MANIS PADANG
THN.ANGG. : 2016

NO. U RAIAN PE K E R JAAN HARGA SATUAN KETERANGAN


1 2 3 4

A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN

1 1 M' Pengukuran dan Pemasangan Bouwplank Rp. 60,900.00

B. ANALISA HARGA SATUAN PEKERJAAN TANAH

2 1 M3 Anal. Galian Tanah Biasa Sedalam 1 Meter Rp. 64,600.00


3 1 M3 Urugan Kembali Padat (Galian Sedalam 1 Meter) Rp. 21,500.00
4 1 M3 Anal. Urugan Tanah dengan Alat Berat Rp. 298,182.17
5 1 M3 Anal. Urugan Pasir/ Tanah Rp. 283,900.00

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

6 1 M3 Anal. Pondasi Batu Kali 1 : 3 Rp. 1,345,900.00


7 1 M3 Anal. Pondasi Batu Kali 1 : 4 Rp. 1,278,500.00
8 1 M3 Anal. Aanstampang Batu Kali Rp. 712,200.00

D. ANALISA HARGA SATUAN PEKERJAAN BETON

9 1 M3 Anal. Stamp Beton K 125 Rp. 1,342,500.00


10 1 M3 Anal. Stamp Beton K 175 Lt. 1 Rp. 1,433,100.00
11 1 M3 Anal. Stamp Beton K 175 Lt. 2 Rp. 1,449,300.00
12 1 M3 Anal. Stamp Beton K 175 Lt. 3 Rp. 1,454,800.00

13 1 M3 Anal. Stamp Beton K-225 Lt. 1 Rp. 1,515,400.00


14 1 M3 Anal. Stamp Beton K 225 Lt. 2 Rp. 1,531,600.00
15 1 M3 Anal. Stamp Beton K 225 Lt. 3 Rp. 1,537,000.00
16 1 M3 Anal. Stamp Beton K 250 (Site Mix) Rp. 1,538,200.00
17 1 M3 Anal. Beton Campuran 1 Pc : 3 Ps : 5 Kr Rp. 1,239,700.00

18 10 Kg Anal. Pek. Pembesian Lt. 1 Rp. 21,600.00


19 100 Kg Anal. Pek. Pembesian Lt. 2 Rp. 21,700.00
20 100 Kg Anal. Pek. Pembesian Lt. 3 Rp. 21,800.00
21 1 M2 Anal. Papan Bekisting Untuk Sloof Rp. 208,275.76

22 1 M2 Anal. Bekisting Untuk Kolom Lt. 1 Rp. 217,600.00


23 1 M2 Anal. Bekisting Untuk Kolom Lt. 2 Rp. 222,100.00
24 1 M2 Anal. Bekisting Untuk Kolom Lt. 3 Rp. 223,600.00
25 1 M2 Anal. Bekisting Untuk Balok Lt. 1 Rp. 222,400.00
26 1 M2 Anal. Bekisting Untuk Balok Lt. 2 Rp. 226,900.00
27 1 M2 Anal. Bekisting Untuk Balok Lt. 3 Rp. 228,400.00

28 1 M2 Anal. Bekisting Untuk Pelat Lantai Lt. 1 Rp. 339,500.00


29 1 M2 Anal. Bekisting Untuk Pelat Lantai Lt. 3 Rp. 345,500.00

E. ANALISA HARGA SATUAN PEKERJAAN DINDING DAN PLESTERAN

1 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 2 Lt. 1 Rp. 246,400.00
2 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 2 Lt. 2 Rp. 249,900.00
3 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 2 Lt. 3 Rp. 251,100.00
4 1 M3 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 3 Rp. 237,600.00
5 1 M3 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 4 Lt. 1 Rp. 232,800.00
6 1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 4 Lt. 2 Rp. 236,300.00
1 M2 Anal. Pasangan Bata Merah 1/2 Batu Bata 1 : 4 Lt. 3 Rp. 237,500.00

7 1 M2 Anal. Memasang Dinding Terawang (Rooster) Uk. 20x20x10 cm Campuran Spesi 1 : 3 Lt. 1 Rp. 715,000.00
8 1 M2 Anal. Memasang Dinding Terawang (Rooster) Uk. 20x20x10 cm Campuran Spesi 1 : 3 Lt. 2 Rp. 718,500.00

9 1 M2 Anal. Plesteran 1 : 1 Tebal 15 mm (Afwerking Beton) Lt. 1 Rp. 84,200.00


10 1 M2 Anal. Plesteran 1 : 1 Tebal 15 mm (Afwerking Beton) Lt. 2 Rp. 88,300.00
11 1 M2 Anal. Plesteran 1 : 1 Tebal 15 mm (Afwerking Beton) Lt. 3 Rp. 89,600.00

Satuan Pekerjaan 1 dari 4


NO. U RAIAN PE K E R JAAN HARGA SATUAN KETERANGAN
1 2 3 4

12 1 M2 Anal. Plesteran 1 : 2 Tebal 15 mm Lt. 1 Rp. 74,800.00


13 1 M2 Anal. Plesteran 1 : 2 Tebal 15 mm Lt. 2 Rp. 78,667.66
14 1 M2 Anal. Plesteran 1 : 2 Tebal 15 mm Lt. 3 Rp. 79,900.00
15 1 M2 Anal. Plesteran 1 : 3 Tebal 15 mm Rp. 70,800.00
16 1 M2 Anal. Plesteran 1 : 4 Tebal 15 mm Lt. 1 Rp. 68,000.00
17 1 M2 Anal. Plesteran 1 : 4 Tebal 15 mm Lt. 2 Rp. 72,100.00
18 1 M2 Anal. Plesteran 1 : 4 Tebal 15 mm Lt. 3 Rp. 73,500.00

19 1 M2 Anal. Plesteran Granit, 1 : 2 Granit, Tebal 10 cm Rp. 212,025.00


20 1 M2 Anal. Finishing Siar Pasangan Batu Kali Adukan 1 : 2 Rp. 63,463.70
21 1 M2 Anal. Acian Lt. 1 Rp. 37,000.00

F. ANALISA HARGA SATUAN PEKERJAAN UKIRAN DAN SUN SHIDING

22 1 M2 Anal. Pemasangan Ornamen Ukiran Rp. 1,259,000.00

23 1 M2 Anal. Pemasangan Ornamen Sun Shiding Rp. 1,358,000.00

G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

1 1 M2 Anal. Pasangan Homogeneous Tile Polished 60x60 Lt. 1 Rp. 364,300.00


2 1 M2 Anal. Pasangan Homogeneous Tile Polished 60x60 Lt. 2 Rp. 367,700.00
3 1 M2 Anal. Pasangan Homogeneous Tile Polished 60x60 Lt. 3

4 1 M2 Anal. Pasangan Homogeneous Tile Un Polished 60x60 Lt. 1 Rp. 331,800.00


5 1 M2 Anal. Pasangan Homogeneous Tile Un Polished 60x60 Lt. 2 Rp. 335,200.00
6 1 M2 Anal. Pasangan Homogeneous Tile Un Polished 60x60 Lt. 3 Rp. 340,200.00

7 1 M2 Anal. Pasangan Ceramik Tile Un Polished 25x25 Lt. 1 Rp. 293,000.00


8 1 M2 Anal. Pasangan Ceramic Tile Un Polished 25x25 Lt. 2 Rp. 302,500.00
9 1 M2 Anal. Pasangan Ceramic Tile Un Polished 25x25 Lt. 3 Rp. 316,300.00

10 1 M' Anal. Plint Granit Uk. 10 x 60 cm Lt. 1 Rp. 51,200.00


11 1 M' Anal. Plint Granit Uk. 10 x 60 cm Lt. 2 Rp. 53,000.00
12 1 M' Anal. Plint Granit Uk. 10 x 60 cm Lt. 3 Rp. 55,500.00

13 1 M2 Anal. Pas. Dinding Keramik Toilet 25x40 cm Lt. 1 Rp. 294,100.00


14 1 M2 Anal. Pas. Dinding Keramik Toilet 25x40 cm Lt. 2 Rp. 306,300.00
15 1 M2 Anal. Pas. Dinding Keramik Toilet 25x40 cm Lt. 3 Rp. 324,100.00

16 1 M2 Anal. Memasang Batu Andesit Polos Bakar Uk. 15 x 30 x 1.5 cm Rp. 319,900.00
17 1 M2 Anal. Memasang Batu Alam W.K Cirebon Uk. 20x40x1,5 cm Rp. 386,500.00
18 1 M' Anal. Stair Nosing Granit 10x60 cm Rp. 74,820.79

19 1 M2 Anal. Pekerjaan Waterproofing Sheet (Toilet Area) Rp. 71,500.00


20 1 M2 Anal. Pekerjaan Waterproofing Sheet (Dak Beton) / System Membran Sheet Rp. 225,400.00
21 1 M2 Anal. Pasangan Floor Hardener Rp. 204,400.00

H. ANALISA HARGA SATUAN PEKERJAAN LANGIT-LANGIT DAN PARTISI

1 1 M2 Pemasangan Plafond Fiber Cement Uk. 1200x2400x8 mm Jarak 60x60 cm Rp. 162,200.00
2 1 M' Anal. Pek. Memasang List Plafond Rp. 20,064.00
3 1 M2 Anal. Memasang Rangka Plafond Hollow 20x40x0.6 mm Rp. 236,665.00
4 1 M2 Pemasangan Dinding Partisi Fiber Cement Tebal 6 mm setara Kalsibord [2 Sisi] Rp. 208,000.00

I. ANALISA HARGA SATUAN PEKERJAAN PENGECATAN

1 1 M2 Anal. Mencat Tembok Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 2 Lapis Cat Penutup Lt. 1 Rp. 44,600.00
2 1 M2 Anal. Mencat Tembok Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 2 Lapis Cat Penutup Lt. 2 Rp. 45,500.00
3 1 M2 Anal. Mencat Tembok Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 2 Lapis Cat Penutup Lt. 3 Rp. 45,800.00
4 1 M2 Anal. Mencat Bidang Baru, 1 Lapis Plamur + 1 Lapis Cat Dasar + 3 Lapis Cat Penutup/ Interior Rp. 54,900.00
5 1 M2 Anal. Pengecatan Permukaan Baja Galvanish Secara Manual Sistem 1 Lapis Cat Rp. 30,200.00

J. ANALISA HARGA SATUAN PEKERJAAN BESI, ALUMINIUM, PINTU/ JENDELA

1 1 Kg Anal. Pemasangan Besi Baja Profil Rp. 39,700.00


2 Anal. Pasangan Daun Pintu Besi Plat Tebal 2 mm Rangkap, Rangka Baja Siku/ M2 Rp. 1,148,800.00
3 1 cm Anal. Pengelasan dengan Las Listrik Rp. 5,400.00
4 1 M' Anal. Memasang Kusen Aluminium 3" Color Anodized Rp. 141,900.00
1 M' Anal. Memasang Kusen Aluminium 3" Powder Coating Rp. 148,038.00
5 1 M' Anal. Memasang Frame Jendela Casement 4" Color Anodized Rp. 148,000.00
6 1 M2 Anal. Memasang Terali Besi Strip 20x3 mm Rp. 663,200.00
7 Anal. Pasang Pegangan Pintu (Pull Handle setara Dekkson) / Buah Rp. 1,744,900.00
8 Anal. Pemasangan Pegangan Pintu setara (Lever Handle setara HRE 61.69 Solid ) / Buah Rp. 401,800.00

Satuan Pekerjaan 2 dari 4


NO. U RAIAN PE K E R JAAN HARGA SATUAN KETERANGAN
1 2 3 4

9 Anal. Pasang Escutcheon setara Dekkson / Buah Rp. 132,700.00


10 Anal. Pasang Double Cylinder setara Dekkson / Buah Rp. 242,700.00
11 Anal. Pasang Roller Lockcase setara LC102WL-40 Solid / Buah Rp. 347,242.50
12 Anal. Pasang Lockcase setara Dekkson / Buah Rp. 347,200.00
13 Anal. Pasang Engsel Pintu Setara Dekkson / Buah Rp. 160,000.00
14 Anal. Pasang Engsel Casement Setara Dekkson / Buah Rp. 521,800.00
15 Anal. Pasang Handle Jendela setara Dekkson / Buah Rp. 47,400.00
16 1 M2 Anal. Pasang Kaca Buram Tebal 8 mm Rp. 168,500.00
17 1 M2 Anal. Pasang Kaca Tempered Stopsol Tebal 8 mm Rp. 719,100.00
18 1 M2 Anal. Pasang Kaca Bening Tebal 8 mm Rp. 192,700.00
19 1 M2 Anal. Pasang Kaca Cermin Tebal 5 mm Rp. 184,400.00

20 Anal. Pasangan Jendela Type J1/ Unit Rp. 15,535,800.00


21 Anal. Pasangan Jendela Type J2/ Unit Rp. 9,638,100.00
22 Anal. Pasangan Jendela Type J3/ Unit Rp. 10,023,600.00
23 Anal. Pasangan Jendela Type J1-D/ Unit Rp. 21,681,800.00
24 Anal. Pasangan Jendela Type BV 1/ Unit Rp. 4,840,800.00
25 Anal. Pasangan Jendela Type BV 2/ Unit Rp. 742,200.00

26 Anal. Pasangan Pintu Type PD-1/ Unit Rp. 15,047,300.00


27 Anal. Pasangan Pintu Type PD-2/ Unit Rp. 11,087,900.00
28 Anal. Pasangan Pintu Type P1/ Unit Rp. 10,227,500.00
29 Anal. Pasangan Pintu Type P2a/ Unit Rp. 6,892,600.00
30 Anal. Pasangan Pintu Type P3/ Unit [Shaft] Rp. 2,626,900.00
31 Anal. Pasangan Pintu Type P4/ Unit Rp. 5,833,700.00
32 Anal. Pasangan Pintu Type PD 3/ Unit Rp. 11,008,600.00
33 Anal. Pasangan Pintu Type PD 4/ Unit Rp. 11,860,200.00
34 Anal. Pasangan Pintu Type PD 5/ Unit Rp. 12,504,000.00
35 1 M2 Anal. Pekerjaan Supply dan Pemasangan Dinding Exterior FCP Rp. 855,100.00

K. ANALISA HARGA SATUAN PEKERJAAN FINISHING TANGGA

1 Anal. Finishing Tangga Type 1/ Unit Rp. 25,304,400.00


2 Anal. Finishing Tangga Type 2/ Unit Rp. 30,263,000.00
3 Anal. Finishing Tangga Type 3/ Unit Rp. 28,703,600.00
4 Anal. Finishing Tangga Type 4/ Unit Rp. 34,183,000.00
5 Anal. Finishing Tangga Type 5/ Unit Rp. 10,451,200.00
6 Anal. Finishing Tangga Type 6/ Unit Rp. 39,484,000.00
7 Anal. Finishing Tangga Type 7/ Unit Rp. 825,000.00

L. ANALISA HARGA SATUAN PEKERJAAN SANITARY

1 Anal. Memasang Dinding Partisi Cubicle Toilet/ Unit


2 Anal. Memasang Closet Duduk setara TOTO CW 421 J / Buah Rp. 3,128,200.00
3 Anal. Memasang Closet Duduk for Disabled setara C704L/SW784JP / Buah Rp. 4,552,300.00
4 Anal. Memasang Closet Jongkok setara TOTO CE9 / Buah Rp. 3,793,400.00
5 Anal. Memasang Urinoir setara TOTO U 57 / Buah Rp. 2,856,800.00
6 Anal. Memasang Jet Washer setara TOTO THX 20 White / Buah Rp. 264,800.00
7 Anal. Memasang Washtafel setara Toto LW 230 J Warna Putih / Buah Rp. 2,256,700.00
8 Anal. Memasang Hand Shower setara Toto THX 19 B / Buah Rp. 335,200.00
9 Anal. Memasang Kitchen Sink Royal setara Royal SB 1/ Buah Rp. 430,300.00
10 Anal. Memasang Floor Drain setara TOTO TX 1 BN / Buah Rp. 458,400.00
11 Anal. Memasang Kran Air setara TOTO Tipe T23 B13 / Buah Rp. 310,500.00
12 Anal. Memasang Kran Dapur setara TOTO TXX 609 K / Buah Rp. 492,000.00
13 Anal. Memasang Paper Holder setara TOTO S 20 / Buah Rp. 430,650.00
14 Anal. Memasang Towel Holder setara TOTO TX 701 AEZ / Buah Rp. 695,750.00
15 Anal. Memasang Sekat Urinoir setara TOTO A 100/ Buah Rp. 1,542,051.75
16 Anal. Memasang Hand Rail Toilet Disable/ M' Rp. 81,900.00
17 1 Unit Anal. Meja Wastafel Tebal 8 cm , Uk 65 x 450 Rp. 5,050,200.00
18 1 Unit Anal. Meja Pantry Tebal 10 cm , Uk. 65 x 600 Rp. 5,692,900.00

M. ANALISA HARGA SATUAN PEKERJAAN ATAP

1 1 M2 Anal. Memasang Atap Bitumen setara Onduline Rp. 157,100.00


2 1 m² Anal. Memasang Bituminous Roofing File setara Onduline Rp. 205,700.00
3 1 m Anal. Memasang Nok/Bubungan setara Onduline Rp. 128,000.00
4 1 m Anal. Memasang Wall Flashing Rp. 98,700.00
5 1 M' Anal. Listplank GRC Board, Lebar 30 cm, Tebal 9 mm Rp. 35,900.00

Satuan Pekerjaan 3 dari 4


NO. U RAIAN PE K E R JAAN HARGA SATUAN KETERANGAN
1 2 3 4

N. ANALISA HARGA SATUAN PEKERJAAN LANDSCAPE

1 Anal. Pemasangan Paving Block Warna Tebal 8 cm Type Hexagon K-225 / M2 Rp. 145,000.00
2 1 Bh Anal. Pemasangan Kanstein Uk. 21.30.60 Rp. 58,500.00
3 1 M' Anal. Memasang Grill Penutup Saluran Rp. 238,920.00
4 1 M3 Anal. Urugan Tanah Subur Rp. 167,200.00
5 1 M3 Anal. Urugan Pupuk Rp. 375,100.00
6 1 M2 Anal. Pembentukan dan Pengolahan Tanah Rp. 2,700.00
7 1 Titik Anal Pekerjaan Lubang Tanam Rp. 16,500.00
8 1 Batang Anal. Pohon Ketapang Kencana (Varigata), T= 3-4 m Rp. 318,000.00
9 1 Batang Anal. Pohon Palem Ekor Tupai (Wodyetia Bifurcata), T = 2,5 m Rp. 510,500.00
10 1 Batang Anal. Pohon Palem Sikas (Encephalartos Horridus), T = 1 m Rp. 180,500.00
11 1 Batang Anal. Pohon Biola Cantik (Ficus Lyrata), T = 3 m Rp. 290,500.00
12 1 Batang Anal. Perdu Melati Mini Golden (Gardenia Mini), T = 60 cm Rp. 29,300.00
13 1 Batang Anal. Pohon Lili Brasil (Dianella Tasmanica) Rp. 29,883.33
14 1 Batang Anal. Perdu Bunga Asoka (Saraca Asoca), T = 50 cm Rp. 40,333.33
15 1 Batang Anal. Perdu Bawang-bawangan (Zephyranthes) Rp. 37,500.00
16 1 M² Anal. Rumput Gajah Mini (Pennisetum Purperium Schamach) Rp. 41,200.00

Satuan Pekerjaan 4 dari 4


RENCANA ANGGARAN BIAYA

KEGIATAN : PERENCANAAN GEDUNG


PEKERJAAN : PERENCANAAN DED KANTIN TEKNIK SIPIL
LOKASI : KAMPUS UNAND LIMAU MANIS PADANG
THN.ANGG. : 2016

DED KANTIN TEKNIK SIPIL


HARGA SATUAN JUMLAH HARGA
NO. U RAIAN PE K E R JAAN ANL SAT VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6

A PEKERJAAN PERSIAPAN

I PEKERJAAN AWAL

1 Pek. Pembongkaran Tangga Utama [existing] Ls M2 300.00 45,000.00 Rp. 13,500,000.00


2 Pekerjaan Galian Tanah 2 M3 825.00 64,600.00 Rp. 53,295,000.00
3 Pekerjaan Bauwplank 1 M1 80.00 60,900.00 Rp. 4,872,000.00

Sub Total Biaya A.I Rp. 71,667,000.00

II PEKERJAAN TANAH & GALIAN


1 Pekerjaan Galian Tanah 2 M3 13.20 Rp. 64,600.00 Rp. 852,720.00
2 Pekerjaan Pondasi Batu Kali 1:4 11 M3 1.88 Rp. 1,278,500.00 Rp. 2,397,187.50
3 Pekerjaan Aanstampang Batu Kali 1:4 12 M3 2.64 Rp. 712,200.00 Rp. 1,880,208.00
4 Pekerjaan Dinding Penahan Tanah 11 M3 80.00 Rp. 1,278,500.00 Rp. 102,280,000.00
5 Pekerjaan Lantai Kerja 1:3:5 K-125 14 M3 0.66 Rp. 1,342,500.00 Rp. 886,050.00
6 Pekerjaan Sloof 15x20, K-225 U-24

Sub Total Biaya A.II Rp. 108,296,165.50

B PEKERJAAN SUB STRUKTUR BETON

1. PEKERJAAN PONDASI SUMURAN


1 .Pek. Pondasi Sumuran Dia 120 H: 3 Cincin 200 Unit 32.00 Rp. 6,673,700.00 Rp. 213,558,400.00
2 .Pek. Pile Cap 160x160x40 ,K250 -U-39 201 M3 18.43 Rp. 8,124,000.00 Rp. 149,741,568.00
3 .Lantai Kerja 1:3:5 26 M3 0.50 Rp. 1,239,700.00 Rp. 614,097.79

Sub Total Biaya B.1 Rp. 363,914,065.79

2. PEKERJAAN PONDASI PLAT


1 .Pek. Pondasi Plat Menerus 208 M3 4.80 Rp. 5,380,200.00 Rp. 25,824,960.00
2 .Lantai Kerja 1:3:5 26 M3 0.25 Rp. 1,239,700.00 Rp. 312,404.40

Sub Total Biaya B.2 Rp. 26,137,364.40


C PEKERJAAN STUKTUR BETON LT I [ ELEV. 0.00 ]
1. PEKERJAAN STUKTUR BETON UTAMA
1 Pek. Sloof 30x50, K-250 U-39 202 M3 12.00 Rp. 8,470,000.00 Rp. 101,640,000.00
2 .Pek. Kolom Dia 50 ,K-250 U-39 203 M3 11.34 Rp. 8,078,600.00 Rp. 91,604,747.89
3 .Pek. Balok Utama 30x50, K-250 U-39 204 M3 15.75 Rp. 7,192,600.00 Rp. 113,283,450.00
4 .Pek. Balok Anak 25x35, K-250 U-39 205 M3 5.25 Rp. 7,637,400.00 Rp. 40,096,350.00
5 .Pek. Plat Tb 12 Cm, K-250 U-32 206 M3 36.00 Rp. 7,309,200.00 Rp. 263,131,200.00
6 Pek. Kolom L 20x40x15 K-250 U-39 209 M3 Rp. 8,231,800.00 Rp. –

Sub Total Biaya C.1 Rp. 609,755,747.89


2. PEKERJAAN STUKTUR BETON PRAKTIS

1 Pekerjaan Kolom Praktis KP 15x15 K-175, U-24 196 M3 1.51 Rp. 12,742,800.00 Rp. 19,295,657.47
2 Pekerjaan Balok Praktis KP 13 x18 K-175, U-24 198 M3 0.70 Rp. 9,535,800.00 Rp. 6,694,131.60
3 Pekerjaan Balok Lintel 13x18 K-175, U-24 198 M3 0.66 Rp. 9,535,800.00 Rp. 6,251,203.23

Sub Total Biaya C.2 Rp. 32,240,992.30


D PEKERJAAN ARSITEKTUR LT I
I PEKERJAAN PAS. DINDING DAN FINISHING

1 Pasangan Bata 1/2 Batu 1: 2 Traasram, H: 100 cm 42 M2 36.00 Rp. 246,400.00 Rp. 8,870,400.00
2 Pasangan Bata 1/2 Batu 1 : 4 46 M2 90.00 Rp. 232,800.00 Rp. 20,952,000.00
3 Plesteran & Aci Halus 1 : 2 Tebal 15 mm 54 M2 72.00 Rp. 74,800.00 Rp. 5,385,600.00
4 Plesteran & Aci Halus 1 : 4 Tebal 15 mm 58 M2 180.00 Rp. 68,000.00 Rp. 12,240,000.00
5 Pek. Lap. Waterproofing Din.sisi Dalam Bangunan H: 100 cm 86 M2 18.00 Rp. 71,500.00 Rp. 1,287,000.00
6 Afwerking Beton 51 M2 375.00 Rp. 84,200.00 Rp. 31,575,000.00

Sub Total Biaya D.I Rp. 80,310,000.00

RAB DED KANTIN ! 1 dari 4


HARGA SATUAN JUMLAH HARGA
NO. U RAIAN PE K E R JAAN ANL SAT VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6

II PEKERJAAN ORNAMEN ARSITEKTUR

1 Pek. Pemasangan Lettering H: 50 CM + Rangka+cat Ls Unit 17.00 Rp. 2,500,000.00 Rp. 42,500,000.00
“ KANTIN TEKNIK SIPIL “

Sub Total Biaya D.II Rp. 42,500,000.00

III PEKERJAAN FINISHING GRANITE CHIP

1 Pasangan Granite Chip [ ZONA TOILET] Ls M2 64.00 Rp. 350,000.00 Rp. 22,400,000.00

Sub Total Biaya D.III Rp. 22,400,000.00

IV PEKERJAAN PASANGAN PENUTUP LANTAI DAN DINDING

1 Pas. Homogeneous Tile Polished 60x60 setara Granito 66 M2 300.00 Rp. 364,300.00 Rp. 109,290,000.00
2 Pas. Homogeneous Tile Un Polished 60x60 setara Granito 69 M2 30.00 Rp. 331,800.00 Rp. 9,954,000.00
3 Pas. Ceramic Tile Un Polished 25x25 setara Roman Gol. A 72 M2 16.00 Rp. 293,000.00 Rp. 4,688,000.00
4 Pas. Plint Lantai 10x60 setara Granito 79 M2 135.00 Rp. 51,200.00 Rp. 6,912,000.00
5 Pas. Ceramic Tile Un Polished 25x40 setara Roman Gol. A 76 M2 65.52 Rp. 294,100.00 Rp. 19,269,432.00
6 Pas. Waterproofing Lantai Toilet 86 M2 16.00 Rp. 71,500.00 Rp. 1,144,000.00
7 Pas. Floor Hardener R & M E 88 M2 4.00 Rp. 204,400.00 Rp. 817,600.00

Sub Total Biaya D.IV Rp. 152,075,032.00

V PEKERJAAN PLAFOND

1 Plafond Fiber Cement Tebal 8 mm setara Kalsiboard 91 M2 134.00 Rp. 162,200.00 Rp. 21,734,800.00
2 Rangka Plafond Hollow Galvanish 20x40 Tebal 0,6 mm 94 M2 134.00 236,665.00 Rp. 31,713,110.00
3 Pekerjaan List Plafond Gypsum Motif Lurus Lebar 15 cm 93 M' 145.00 20,064.00 Rp. 2,909,280.00
Spesifikasi ; Non Asbes

4 Plafond Fiber Cement Tebal 8 mm Type Acustic Panel setara Kalsiboard 92 M2 216.00 Rp. 358,200.00 Rp. 77,371,200.00
Spesifikasi ; Non Asbes
5 Rangka Plafond Hollow Galvanish 20x40 Tebal 0,6 mm 94 M2 216.00 236,665.00 Rp. 51,119,640.00

Sub Total Biaya D.V Rp. 184,848,030.00

VI PEKERJAAN PENGECATAN

1 Pengecatan Dinding 2x Jalan, Cat setara Dulux [ Exterior] 97 M2 252.00 Rp. 44,600.00 Rp. 11,239,200.00

2 Pengecatan 3x Jalan, Cat setara Dulux ICI [Interior] 100 M2 600.00 Rp. 54,900.00 Rp. 32,940,000.00

3 Pengecatan Afwerking Beton 2x Jalan, Cat setara Dulux [Exterior] 97 M2 375.00 Rp. 44,600.00 Rp. 16,725,000.00

Sub Total Biaya D.VI Rp. 60,904,200.00

VII PEKERJAAN SANITARY FIXTURES DAN AKSESORIES TOILET

1 Closet Jongkok setara TOTO CE9 157 Unit 4.00 Rp. 3,793,400.00 Rp. 15,173,600.00
2 Jet Washer setara TOTO THX 20 White 159 Unit 4.00 Rp. 264,800.00 Rp. 1,059,200.00
3 Floor Drain setara TOTO TX 1 BN 163 Unit 12.00 Rp. 458,400.00 Rp. 5,500,800.00
4 Washtafel setara Toto LW 230 J Warna Putih 160 Unit 2.00 Rp. 2,256,700.00 Rp. 4,513,400.00
5 Kran Air setara TOTO Tipe T23 B13 164 Unit 4.00 Rp. 310,500.00 Rp. 1,242,000.00
6 Cermin Tebal 5 mm (70x80 cm) 124 M2 2.00 Rp. 184,400.00 Rp. 368,800.00

Sub Total Biaya D.VII Rp. 27,857,800.00

RAB DED KANTIN ! 2 dari 4


HARGA SATUAN JUMLAH HARGA
NO. U RAIAN PE K E R JAAN ANL SAT VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
VIII PEKERJAAN CW DAN PINTU ENTRANCE
1 Pas. Kaca Curtain Wall Produk Asahimas Tb 12 mm Ls M2 220.00 Rp. 1,850,000.00 Rp. 407,000,000.00
Kaca Stopsol reflective super silver blue green
tb 12 mm ex. Asahimas , U Chanel 0.8 mm
2 Pas. Pintu Utama Frameless Tb 12 mm +Asc Komplete Ls Unit 2.00 Rp. 12,500,000.00 Rp. 25,000,000.00
Uk. 90x240 dengan 2 Daun

3 Bouventlight Ventilasi Type BV1 129 Unit 4.00 Rp. 750,000.00 Rp. 3,000,000.00

Sub Total Biaya D.VIII Rp. 435,000,000.00

IX PEKERJAAN PARTISI FIBER CEMENT NON ASBES


1 Partisi Fiber Cement Non Asbes Tb 6 mm Setara Kalsiboard 95 M2 45.00 Rp. 208,000.00 Rp. 9,360,000.00
- Rangka Furring + Asc Komplete

Sub Total Biaya D.IX Rp. 9,360,000.00


E PEKERJAAN STRUKTUR LT II [ DAK ATAP]

1 PEK. STRUKTUR LANTAI II


1.1. PENUTUP STRUKTUR UTAMA
Pek. Lapisan Waterproofing dak Beton 87 M2 300.00 Rp. 225,400.00 Rp. 67,620,000.00
Pek. Screading Beton tb 5 cm 13 M3 15.00 Rp. 1,289,300.00 Rp. 19,339,500.00
Pek. Paving Cisangkan Block Tb 8 cm, K-225 177 M2 300.00 Rp. 145,000.00 Rp. 43,500,000.00
Pek. Urugan Pasir 8 M2 30.00 Rp. 283,900.00 Rp. 8,517,000.00
Pek. Listplank Beton Tb 10 cm, K-250 U-24 207 M3 6.75 Rp. 6,954,200.00 Rp. 46,940,850.00
Pek. Kolom L 20x60x15 K-250 U-39 M3 Rp. –

1.2. BETON PRAKTIS


1 Pekerjaan Kolom Praktis KP 13x13 K-175 197 M3 0.76 Rp. 12,897,500.00 Rp. 9,808,548.75
2 Pekerjaan Balok Praktis KP 13x18 K-175 199 M3 1.26 Rp. 9,646,200.00 Rp. 12,188,938.32
3 Screeding Lantai Penthouse 26 M3 2.25 Rp. 1,239,700.00 Rp. 2,789,325.00
Sub Total Biaya E.1 Rp. 210,704,162.07
F PEKERJAAN ARSITEKTUR LT II
1 PEK. DINIDING
1 Pasangan Bata 1/2 Batu 1: 2 44 M2 24.00 Rp. 251,100.00 Rp. 6,026,400.00
2 Pasangan Bata 1/2 Batu 1: 4 48 M2 60.00 Rp. 237,500.00 Rp. 14,250,000.00
3 Plesteran & Aci Halus 1 : 2 Tebal 15 mm 56 M2 48.00 Rp. 79,900.00 Rp. 3,835,200.00
4 Plesteran & Aci Halus 1 : 4 Tebal 15 mm 60 M2 120.00 Rp. 73,500.00 Rp. 8,820,000.00
5 Afwerking Beton 53 M2 35.00 Rp. 89,600.00 Rp. 3,136,000.00
Sub Total Biaya F.1 Rp. 36,067,600.00
2 PEK. RAILLING PEMBATAS
1 Pek. Railling Pengaman Ls M2 25.00 Rp. 450,000.00 Rp. 11,250,000.00

Sub Total Biaya F2 Rp. 11,250,000.00

G PEKERJAAN MEKANIKAL ,ELEKTRIKAL & PLUMBING


1.1. PENERANGAN
1 Pas. Instalasi Penerangan NYM 3 x 2.5 mm Dalam Conduit Ttk 64.00 Rp. 198,552.50 Rp. 12,707,360.00
2 Pas. Instalasi Stop Kontak Ttk 6.00 Rp. 198,552.50 Rp. 1,191,315.00
3 Pas. Stop Kontak Ex. Schneider Bh 6.00 Rp. 43,000.00 Rp. 258,000.00
4 Pas. Sakelar Tunggal Ex. Schneider Bh 4.00 Rp. 35,797.50 Rp. 143,190.00
5 Pas. Lampu ESC 18 Watt + Fitting Bh 24.00 Rp. 55,000.00 Rp. 1,320,000.00
6 Pas. Lampu TL Balok 1 x 36 Watt Bh 24.00 Rp. 125,000.00 Rp. 3,000,000.00
7 Pas. MCB 4 A 1 P Bh 4.00 Rp. 57,200.00 Rp. 228,800.00
8 Pas. Kabel Feeder dari Kios ke kwh meter NYY 3 x 4 mm2 M' 45.00 Rp. 32,787.50 Rp. 1,475,437.50

1.2. PLUMBING
1 Pas. Pipa PVC Rucika Ø 1" (Dari PDAM Ke. Pompa M1 48.00 Rp. 31,712.50 Rp. 1,522,200.00
Transfer dan ke Roof

2 Pas. Pompa Transfer Air Bersih Lengkap Fitting 2, Unit 2.00 Rp. 5,500,000.00 Rp. 11,000,000.00
Pipa hisap & Kabel Power + WLC
Type : SANYO TYPE PH 250 WATT

3 Pas. Fiber Tank Kap. 1100 Liter Unit 2.00 Rp. 1,650,000.00 Rp. 3,300,000.00
4 Pas. Pipa PVC Class AW Ø 4" dari Toilet ke Septicktank M1 12.00 Rp. 109,650.00 Rp. 1,315,800.00
5 Pas. Pipa PVC Class AW Ø 3" Air Kotor Cair ke Saluran Keliling M1 12.00 Rp. 83,312.50 Rp. 999,750.00
6 Pas. Pipa PVC Rucika Ø 1" M1 12.00 Rp. 31,712.50 Rp. 380,550.00
7 Pas. Pipa PVC Rucika Ø 1/2" M1 24.00 Rp. 24,187.50 Rp. 580,500.00
8 Pas. Pipa PVC Class AW Ø 4" Air Hujan M1 48.00 Rp. 109,650.00 Rp. 5,263,200.00
9 Pas. Roof Drain dia. 4" Bh 8.00 Rp. 50,000.00 Rp. 400,000.00

Sub Total Biaya G Rp. 45,086,102.50

RAB DED KANTIN ! 3 dari 4


HARGA SATUAN JUMLAH HARGA
NO. U RAIAN PE K E R JAAN ANL SAT VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6

H PEKERJAAN HALAMAN & LANDSCAPE


1.1. Planting
1 Pembentukan & Pengolahan Tanah 182 M2 250.00 Rp. 2,700.00 Rp. 675,000.00
2 Pembentukan Lubang Tanaman 183 Bh 50.00 Rp. 16,500.00 Rp. 825,000.00
3 Urugan Tanah Subur 180 M2 50.00 Rp. 167,200.00 Rp. 8,360,000.00
4 Pemupukan /Urugan Pupuk Alami 181 M2 50.00 Rp. 375,100.00 Rp. 18,755,000.00

1.2. Pengadaan Tanaman


1 Pohon Ketapang Kencana 184 Bh 8.00 Rp. 318,000.00 Rp. 2,544,000.00
2 Palem Ekor Tupai 185 Bh 8.00 Rp. 510,500.00 Rp. 4,084,000.00
3 Bunga Puring Apel 188 Bh 8.00 Rp. 47,700.00 Rp. 381,600.00
4 Perdu Melati 189 Bh 12.00 Rp. 29,300.00 Rp. 351,600.00
5 Perdu Bawang (Zephyranthes) 193 Bh 12.00 Rp. 37,500.00 Rp. 450,000.00
6 Pas. Rumput Gajah Mini 194 Bh 200.00 Rp. 41,200.00 Rp. 8,240,000.00

Sub Total Biaya H Rp. 44,666,200.00

RAB DED KANTIN ! 4 dari 4


REKAPITULASI ANGGARAN BIAYA PEKERJAAN ARSITEKTUR
KEGIATAN : PERENCANAAN GEDUNG
PEKERJAAN : PERENCANAAN DED KANTIN TEKNIK SIPIL
LOKASI : KAMPUS UNAND LIMAU MANIS PADANG
THN.ANGG. : 2016

DED KANTIN TEKNIK SIPIL


BOBOT JUMLAH HARGA TOTAL JUMLAH
NO. U RAIAN PE K E R JAAN
(%) ( Rp. ) ( Rp. )
1 2 3 4 5

A PEKERJAAN PERSIAPAN 6.99 Rp. 179,963,165.50


I PEKERJAAN AWAL Rp. 71,667,000.00
II PEKERJAAN TANAH & GALIAN Rp. 108,296,165.50

B PEKERJAAN SUB STRUKTUR BETON 15.15 Rp. 390,051,430.19


1. PEKERJAAN PONDASI SUMURAN Rp. 363,914,065.79
2. PEKERJAAN PONDASI PLAT Rp. 26,137,364.40

C PEKERJAAN STUKTUR BETON LT I [ ELEV. 0.00 ] 24.93 Rp. 641,996,740.19


1. PEKERJAAN STUKTUR BETON UTAMA Rp. 609,755,747.89
2. PEKERJAAN STUKTUR BETON PRAKTIS Rp. 32,240,992.30

D PEKERJAAN ARSITEKTUR LT I 39.43 Rp. 1,015,255,062.00


I PEKERJAAN PAS. DINDING DAN FINISHING Rp. 80,310,000.00
II PEKERJAAN ORNAMEN ARSITEKTUR Rp. 42,500,000.00
III PEKERJAAN FINISHING GRANITE CHIP Rp. 22,400,000.00
IV PEKERJAAN PASANGAN PENUTUP LANTAI DAN DINDING Rp. 152,075,032.00
V PEKERJAAN PLAFOND Rp. 184,848,030.00
VI PEKERJAAN PENGECATAN Rp. 60,904,200.00
VII PEKERJAAN SANITARY FIXTURES DAN AKSESORIES TOILET Rp. 27,857,800.00
VIII PEKERJAAN CW DAN PINTU ENTRANCE Rp. 435,000,000.00
IX PEKERJAAN PARTISI FIBER CEMENT NON ASBES Rp. 9,360,000.00

E PEKERJAAN STRUKTUR LT II [ DAK ATAP] 8.18 Rp. 210,704,162.07


1 PEK. STRUKTUR LANTAI II Rp. 210,704,162.07

F PEKERJAAN ARSITEKTUR LT II 1.84 Rp. 47,317,600.00


1 PEK. DINIDING Rp. 36,067,600.00
2 PEK. RAILLING PEMBATAS Rp. 11,250,000.00

G PEKERJAAN MEKANIKAL ,ELEKTRIKAL & PLUMBING 1.75 Rp. 45,086,102.50 Rp. 45,086,102.50

H PEKERJAAN HALAMAN & LANDSCAPE 1.73 Rp. 44,666,200.00 Rp. 44,666,200.00

JUMLAH TOTAL [A + B + C + D + E + F + G + H] 100.00 Rp. 2,575,040,462.45


PPn 10% Rp. 257,504,046.25
JUMLAH PEKERJAAN FISIK Rp. 2,832,544,508.70
DIBULATKAN Rp. 2,832,544,000.00
Terbilang : # Dua Milyar Delapan Ratus Tiga Puluh Dua Juta Lima Ratus Empat Puluh Empat Ribu Rupiah #
Padang, Desember 2016

Konsultan Perencana
CV. DINAMIKA CIPTA CONSULTANT

EZY ESA LONA, ST


Direktur

REKAP BANGUNAN ! 1 dari 1


T I M E S C H E D U L E
KEGIATAN : PERENCANAAN GEDUNG
PEKERJAAN : PERENCANAAN DED KANTIN TEKNIK SIPIL
LOKASI : KAMPUS UNAND LIMAU MANIS PADANG

DED KANTIN TEKNIK SIPIL

WAKTU PE LAK SANAAN


START
NO. U R A I A N PE K E R JAAN BOBOT D MINGGU KE- KETERANGAN
(%) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

A PEKERJAAN PERSIAPAN 6.989 6.00 0.16 0.66 1.16 1.66 2.16 1.16 6.989 0.000

B PEKERJAAN SUB STRUKTUR BETON 15.147 8.00 0.89 2.39 2.39 1.89 1.89 1.89 1.89 1.89 15.147 -0.000

C PEKERJAAN STUKTUR BETON LT I [ ELEV. 0.00 ] 24.932 10.00 0.99 1.49 1.99 2.49 1.49 4.49 4.49 3.99 1.49 1.49 24.432 -0.500

D PEKERJAAN ARSITEKTUR LT I 39.427 14.00 2.82 2.82 3.32 2.57 4.57 3.32 3.82 2.82 2.82 3.07 3.07 2.32 1.32 1.32 39.927 0.500

E PEKERJAAN STRUKTUR LT II [ DAK ATAP] 8.183 9.00 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 SKALA 8.183 0.000

F PEKERJAAN ARSITEKTUR LT II 1.838 9.00 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 1.838 0.000

G PEKERJAAN MEKANIKAL ,ELEKTRIKAL & PLUMBING 1.751 4.00 0.19 0.69 0.44 0.44 1.751 0.000

H PEKERJAAN HALAMAN & LANDSCAPE 1.735 3.00 0.58 0.58 0.58 1.735 0.000

100.000 100.000 0.000


RENCANA JUMLAH BOBOT PER MINGGU 3.49 0.00 0.16 0.66 1.16 1.66 2.16 2.06 2.39 2.39 2.89 3.39 3.89 4.39 6.20 7.51 8.01 6.76 6.26 5.01 4.93 3.93 3.93 4.18 3.98 3.23 2.23 2.41 1.60 1.02 1.02 0.58
BOBOT JUMLAH BOBOT AKUMULATIF 0.00 0.16 0.83 1.99 3.66 5.82 7.88 10.28 12.67 15.56 18.94 22.83 27.22 33.42 40.93 48.95 55.71 61.97 66.99 71.92 75.84 79.77 83.95 87.93 91.15 93.38 95.79 97.39 98.41 99.42 100.00
REALISASI JUMLAH BOBOT PER MINGGU 0.00 0.50 1.00 1.00 1.50 1.50 2.00 2.50 2.50 3.00 3.50 4.00 4.50 6.00 7.00 8.00 6.50 6.00 5.50 5.00 5.00 4.50 4.00 4.00 3.00 2.00 2.00 1.50 1.00 1.00 0.50
BOBOT JUMLAH BOBOT AKUMULATIF 0.00 0.50 1.50 2.50 4.00 5.50 7.50 10.00 12.50 15.50 19.00 23.00 27.50 33.50 40.50 48.50 55.00 61.00 66.50 71.50 76.50 81.00 85.00 89.00 92.00 94.00 96.00 97.50 98.50 99.50 100.00
DEVIASI TERCEPAT ( + ) 0.00 (0.34) (0.67) (0.51) (0.34) 0.32 0.38 0.28 0.17 0.06 (0.06) (0.17) (0.28) (0.08) 0.43 0.45 0.71 0.97 0.49 0.42 (0.66) (1.23) (1.05) (1.07) (0.85) (0.62) (0.21) (0.11) (0.09) (0.08) 0.00
BOBOT TERLAMBAT ( - )

Padang, Desember 2016


**Waktu Pelaksanaan : 210 Hari Kalender
** Estimate Waktu : Dibuat Oleh :
Start Date Finish Date Hari Minggu Bulan KONSULTAN PERENCANA
1/1/17 8/1/17 210d 30.00 7.00 CV. DINAMIKA CIPTA CONSULTANT

79,799,989.44
4,723,345,079.95
1,642,133,929.97
1,194,243,821.39 EZY ESA LONA, ST
796,443,145.19 Direktur
1,005,506,921.57
9,441,472,887.51

Time Schedule