Harga Satuan
No. URAIAN PEKERJAAN BOBOT BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5 BULAN 6 BULAN 7
(Rp.) KETERANGAN
1 2 5 5 6 7 8 8 9 10 11
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
I PEKERJAAN PERSIAPAN 148,564,854.90 2.42 0.61 0.61 0.61 0.61 100
II PEKERJAAN LANTAI 01
A PEKERJAAN TANAH & BATU 337,420,096.05 5.50 1.38 1.38 ### ###
B PEKERJAAN BETON 1,516,414,060.49 24.73 4.12 4.12 4.12 4.12 4.12 4.12
PERSIAPAN
H PEKERJAAN KUSEN 132,489,811.74 2.16 0.72 0.72 0.72
PAJAK PERTABAHAN NILAI ( PPN ) 613,145,014.57 - 0.61 1.21 3.19 5.17 9.34 13.5 20.4 27.3 32.8 38.2 44.6 52.6 59.9 67.2 75.3 79.6 83.9 86.7 89.6 92.4 94.0 95.6 96.7 97.8 98.9 100 100
DIBULATKAN 6,744,590,000.00
DJAMIL TAHER
Direktur