Paket
PEKERJAAN
1 (satu)
: Pembangunan PSU perumahan Panam Permata Regency, Villa Permata Panam,
dan Cipta Palutan Regency
LOKASI
: Panam - Pekanbaru
TAHUN ANGGARAN
: APBN 2012
NO
URAIAN PEKERJAAN
I.
PEKERJAAN PERSIAPAN
A PEKERJAAN PERSIAPAN
B PEKERJAAN PERKERASAN BETON
C PEKERJAAN SALURAN
D PEKERJAAN AKHIR
JUMLAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN
Terbilang : Lima Liliyar Enam Ratus Dua Puluh Sembilan Juta Delapan Rarus Lima Belas ribu rupiah.
REKAPITULASI BIAYA
JUMLAH HARGA
30,352,043.50
5,086,011,305.38
1,650,000.00
5,118,013,348.88
511,801,334.89
5,629,814,683.76
5,629,815,000.00
lokasi
: Panam - Pekanbaru
Tahun Anggaran
: APBN 2012
Kegiatan
Pekerjaan Jalan
1. panjang jalan
NO
URAIAN PEKERJAAN
SAT
VOL
harga
satuan
I.
PEKERJAAN PERSIAPAN
m1
3,103.00
7,364.50
m2
12.00
250,000.00
bh
3.00
500,000.00
Monilisasi
ls
1.00
3,000,000.00
B.
M3
2,327.25
1,643,400.00
m2
15,515.00
4,620.00
m3
775.75
1,193,128.75
m2
1,244.00
55,632.50
m1
3,881.25
9,195.01
m1
3,881.25
41,034.40
-
C.
PEKERJAAN SALURAN
m2
m2
m2
m1
D.
PEKERJAAN PENYELESAIAN
ls
1.00
150,000.00
Pembersihan Lapangan
LS
1.00
1,500,000.00
Jalan
ROW 5 M
3,163.00
PENAWARAN
jumlah harga
sub total
22,852,043.5000
3,000,000.0000
1,500,000.0000
3,000,000.0000
30,352,043.5000
3,824,602,650.0000
71,679,300.0000
925,569,627.8125
69,206,830.0000
35,688,132.5625
159,264,765.0000
5,086,011,305.3750
150,000.0000
1,500,000.0000
1,650,000.0000
Rp
5,118,013,348.88
URAIAN
1 M'
KODE
SATUAN
VOLUME
HARGA SATUAN
JUMLAH (RP)
M.020
m3
0.00200
2,300,000.00
4,600.00
M.040
Kg
0.0500
36,000.00
1,800.00
Tukang Kayu
L.073
oh
0.0020
60,000.00
120.00
Tukang batu
L.079
oh
0.0020
60,000.00
120.00
Buruh Lapangan
L.101
oh
0.0010
55,000.00
55.00
Upah
Peralatan
Sub jumlah
6,695.00
669.50
No.
1
URAIAN
1 bh
KODE
SATUAN
VOLUME
7,364.50
HARGA SATUAN
JUMLAH (RP)
SNI-T1
m3
0.09000
K.719
m3
0.0830
Dihit
m3
0.0500
Pas. Triplek
Dihit
m2
1.8900
Pas. Pengecatan
SNI-CAT8
m2
1.8900
Pas. Penyablonan
ls
ls
1.0000
Pemberesan Lapangan
ls
ls
1.0000
No.
1
URAIAN
1 M'
KODE
SATUAN
32,000.00
2,880.00
#REF!
#REF!
Sub jumlah
#REF!
#REF!
#REF!
VOLUME
HARGA SATUAN
JUMLAH (RP)
Upah
Mandor
L.061
oh
0.0070
70,000.00
490.00
L.101
oh
0.8000
55,000.00
44,000.00
M.170
set
1.0000
1,000.00
1,000.00
Peralatan
Alat Bantu
Sub jumlah
Biaya umum dan kepentingan
Total Harga satuan
45,490.00
4,549.00
50,039.00
No.
1
URAIAN
1 m3
KODE
SATUAN
VOLUME
HARGA SATUAN
JUMLAH (RP)
M3
1.00000
920,000.00
920,000.00
70,000.00
Upah
Mandor
L.061
oh
1.0000
70,000.00
L.106
oh
1.0000
60,000.00
60,000.00
L.101
oh
8.0000
55,000.00
440,000.00
M.170
set
2.0000
2,000.00
4,000.00
Peralatan
Alat Bantu
Sub jumlah
1,494,000.00
149,400.00
No.
1
URAIAN
1 m1
KODE
SATUAN
VOLUME
1,643,400.00
HARGA SATUAN
JUMLAH (RP)
M.020
m2
1.00000
4,000.00
4,000.00
L.073
oh
1.0000
200.00
200.00
Upah
Ongkos Pasang
Peralatan
Sub jumlah
4,200.00
420.00
No.
1
URAIAN
1 m3
KODE
SATUAN
VOLUME
4,620.00
HARGA SATUAN
JUMLAH (RP)
m3
1.00000
1,070,000.00
1,070,000.00
Upah
Mandor lapangan
L.061
oh
0.0208
70,000.00
1,458.33
Kepala Tukang
L.073
oh
0.0208
65,000.00
1,354.17
L.106
oh
0.0208
60,000.00
1,250.00
1.101
oh
0.1250
55,000.00
6,875.00
E.089
jam
0.2300
7,500.00
1,725.00
alat bantu
M.170
ls
1.0000
2,000.00
2,000.00
Peralatan
Sub jumlah
Biaya umum dan kepentingan
Total Harga satuan
1,084,662.50
108,466.25
1,193,128.75
No.
1
URAIAN
1 m2
KODE
SATUAN
VOLUME
HARGA SATUAN
JUMLAH (RP)
M.180
Multi plex
Paku
m3
0.00160
2,300,000.00
3,680.00
lbr
0.45000
60,000.00
27,000.00
11,600.00
M.166
kg
0.2000
58,000.00
Kepala Tukang
L.073
oh
0.0030
65,000.00
195.00
Tukang Kayu
L.079
oh
0.0300
60,000.00
1,800.00
L.106
oh
0.0500
60,000.00
3,000.00
1.101
oh
0.0600
55,000.00
3,300.00
Upah
Peralatan
Sub jumlah
50,575.00
5,057.50
No.
1
URAIAN
1 m1
KODE
SATUAN
VOLUME
55,632.50
HARGA SATUAN
JUMLAH (RP)
M.180
jam/m
0.05000
70,000.00
3,500.00
Sealant
M.166
kg
0.1429
24,000.00
3,429.60
Mandor
L.073
oh
0.0080
70,000.00
560.00
L.106
oh
0.0067
60,000.00
402.00
1.101
oh
0.0085
55,000.00
467.50
Upah
Peralatan
Sub jumlah
8,359.10
835.91
No.
1
URAIAN
1 m1
KODE
SATUAN
VOLUME
9,195.01
HARGA SATUAN
JUMLAH (RP)
Dihit
kg
1.20000
8,200.00
kawat beton
Dihit
kg
0.0107
20,000.00
9,840.00
214.00
Dihit
0.2000
17,000.00
3,400.00
Dihit
bh
3.3000
3,000.00
9,900.00
Mandor
Dihit
oh
0.0150
70,000.00
1,050.00
Pekerja
Dihit
oh
0.0650
60,000.00
3,900.00
Tukang besi
Dihit
oh
0.1500
60,000.00
9,000.00
ls
1.0000
5,000.00
5,000.00
Upah
Peralatan
Alat bantu
Sub jumlah
Biaya umum dan kepentingan
Total Harga satuan
37,304.00
3,730.40
41,034.40
No.
1
URAIAN
1 m2
KODE
SATUAN
VOLUME
HARGA SATUAN
JUMLAH (RP)
M.020a
bh
65.00000
1,200.00
78,000.00
Semen Portland
M.040a
kg
0.2874
61,000.00
17,531.40
Pasir pasang
M.170a
set
0.0400
190,000.00
7,600.00
Mandor
oh
0.0150
70,000.00
1,050.00
Pekerja
oh
0.3200
60,000.00
19,200.00
Kepala Tukang
oh
0.0100
65,000.00
650.00
oh
0.1000
60,000.00
6,000.00
Upah
Peralatan
Alat bantu
ls
Sub jumlah
130,031.40
13,003.14
No.
1
URAIAN
1 m2
KODE
SATUAN
VOLUME
143,034.54
HARGA SATUAN
JUMLAH (RP)
M.020
m3
0.03140
190,000.00
Kerikil (beton)
M.042
m3
0.0270
250,000.00
5,966.00
6,750.00
semen
M.170
zak
0.3250
61,000.00
19,825.00
Mandor
oh
0.0260
70,000.00
1,820.00
Pekerja
oh
0.3200
60,000.00
19,200.00
Kepala Tukang
oh
0.0100
65,000.00
650.00
oh
0.0960
60,000.00
5,760.00
Upah
Peralatan
Alat bantu
ls
Sub jumlah
59,971.00
5,997.10
No.
1
URAIAN
1 m2
KODE
SATUAN
VOLUME
65,968.10
HARGA SATUAN
JUMLAH (RP)
M.020
zak
0.12960
61,000.00
7,905.60
Pasir pasang
M.042
m3
0.0190
190,000.00
3,610.00
Mandor
oh
0.0100
70,000.00
700.00
Pekerja
oh
0.2000
60,000.00
12,000.00
Kepala Tukang
oh
0.0150
65,000.00
975.00
oh
0.1500
60,000.00
9,000.00
Upah
Peralatan
Alat bantu
ls
Sub jumlah
Biaya umum dan kepentingan
Total Harga satuan
34,190.60
3,419.06
37,609.66
No.
1
URAIAN
1 m1
KODE
SATUAN
VOLUME
HARGA SATUAN
JUMLAH (RP)
1.0000
320,000.00
320,000.00
m1
1.0000
1,500.00
1,500.00
m3
0.6100
27,000.00
16,470.00
m3
0.0500
22,000.00
1,100.00
m3
0.0500
190,000.00
9,500.00
m1
1.0000
30,000.00
30,000.00
m3
0.3200
50,000.00
16,000.00
Pemberesan Lokasi
LS
1.0000
2,000.00
2,000.00
Upah
Peralatan
Alat bantu
ls
Sub jumlah
Biaya umum dan kepentingan
Total Harga satuan
76,570.00
7,657.00
84,227.00
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
BAHAN/ MATERIAL
Bata merah bakar Kls I
Batako besar 8 x 20 x 30
batu pecah 2-3 cm
besi beton U-24 (Polos)
Bensin Premium
Box Culvert 40.40.100 (kualitas I)
Cat kayu sleve
DOP PVC 3/4" untuk DOWEL
Kawat Beton
Kayu kelas III
Lem kayu
Multiplex 3 mm 120 x 240
Paku
Pasir Beton
Pasir Pasang
Plastik Bond Breaker
Ready Mix Beton 80 tanpa pompa (selang)
PVC dia. 3/4"
Beton K.225 Tanpa ponpa pompa (selang)
Seng gelombang BJLS 30
Solar
Sealant
HARGA SATUAN
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
70,000.00
55,000.00
55,000.00
60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
60,000.00
55,000.00
70,000.00
55,000.00
60,000.00
55,000.00
60,000.00
55,000.00
60,000.00
55,000.00
60,000.00
1,200.00
6,000.00
250,000.00
8,200.00
7,000.00
320,000.00
36,000.00
3,000.00
20,000.00
2,300,000.00
30,000.00
60,000.00
58,000.00
190,000.00
190,000.00
4,000.00
1,070,000.00
17,000.00
920,000.00
65,000.00
7,000.00
24,000.00
61,000.00
N
SATUAN
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
bh
bh
m3
kg
ltr
m1
kg
bh
kg
m3
ltr
lbr
kg
m3
m3
m2
m3
btg
m3
lbr
ltr
kg
zak
ENGINEER ESTIMATE
HARGA
NO
URAIAN PEKERJAAN
SAT
VOL
SATUAN
( Rp )
I.
A.
PEKERJAAN PENDAHULUAN
Ls
1.00
1,200,000.00
Pembersihan Lokasi
Ls
1.00
6,000,000.00
Pengukuran/Pemasangan Bouwplank
M'
311.51
6,695.00
Ls
1.00
7,000,000.00
Ls
1.00
400,000.00
Ls
1.00
7,000,000.00
P3/Keamanan
Ls
1.00
300,000.00
Ls
1.00
5,000,000.00
Mobilisasi/De-Mobilisasi
Ls
1.00
5,000,000.00
B.
M3
210.20
#REF!
M3
127.68
#REF!
M3
11.67
#REF!
C.
Btg
2,106.00
#REF!
M3
21.77
#REF!
M3
12.74
#REF!
M3
71.40
#REF!
M3
12.20
#REF!
M3
26.62
#REF!
M3
12.56
#REF!
M3
156.69
#REF!
10
Plesteran Bata 1 : 4
M2
1,157.24
#REF!
11
Plesteran Relief
Bh
74.00
12
M3
9.00
D.
PEKERJAAN BESI
M'
22.83
975,000.00
M'
12.00
1,112,000.00
E.
PEKERJAAN CAT
Cat Dinding/Tembok
M2
1,157.24
#REF!
Cat Besi
M2
64.40
#REF!
300,000.00
#REF!
TOTAL
ENGINEER ESTIMATE
SELAT PANJANG
HARGA
NO
URAIAN PEKERJAAN
SAT
VOL
SATUAN
( Rp )
II
Pekerjaan Persiapan
1
ls
1.00
7,000,000.00
ls
1.00
5,000,000.00
ls
1.00
3,000,000.00
Pekerjaan Tanah
1
M3
2.70
#REF!
M3
0.68
#REF!
M3
30.00
#REF!
M3
3.97
#REF!
Plesteran dinding 1 : 4
M2
39.98
Ls
1.00
3,000,000.00
Ls
1.00
2,700,000.00
M3
42.00
1,199,000.00
10
M2
600.00
#REF!
11
M'
86.00
#REF!
#REF!
Pekerjaan Atap
1
M2
822.00
#REF!
M2
822.00
#REF!
M'
76.63
#REF!
M2
21.34
#REF!
Pekerjaan Plafond
1
M2
600.00
M2
112.23
M'
100.00
#REF!
M2
1,320.00
#REF!
M2
112.23
#REF!
#REF!
143,000.00
Pekerjaan Pengecatan
1
2
Bh
2.00
8,015,625.00
Bh
11.00
2,671,875.00
3,534,375.00
1,006,250.00
Bh
1.00
Bh
2.00
HARGA
NO
URAIAN PEKERJAAN
SAT
VOL
SATUAN
( Rp )
TTk
17.00
#REF!
#REF!
#REF!
Bh
61.00
Bh
12.00
Bh
1.00
Saklar Tunggal
Bh
1.00
#REF!
Bh
11.00
#REF!
#REF!
#REF!
Saklar Ganda
3,000,000.00
Stop Kontak
Bh
4.00
MCB
Bh
1.00
Ls
1.00
2,000,000.00
10
Ls
1.00
16,000,000.00
Pembersihan Akhir
Ls
1.00
2,300,000.00
TOTAL
III
M3
789.87
#REF!
M2
1,229.46
#REF!
M3
21.00
#REF!
#REF!
#REF!
M3
9.47
M2
48.00
Ls
1.00
7,000,000.00
Ls
2.00
1,750,000.00
Pembersihan Akhir
Ls
1.00
6,000,000.00
TOTAL HARGA
SUB TOTAL
SATUAN
HARGA SATUAN
( Rp )
( Rp )
1,200,000.00
1,088,400.00
1,088,400.0000
6,000,000.00
5,442,000.00
5,442,000.0000
2,085,559.45
6,072.37
1,891,602.4212
7,000,000.00
6,349,000.00
6,349,000.0000
400,000.00
362,800.00
362,800.0000
7,000,000.00
6,349,000.00
6,349,000.0000
300,000.00
272,100.00
272,100.0000
5,000,000.00
4,535,000.00
4,535,000.0000
4,535,000.00
4,535,000.0000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
5,000,000.00
JUMLAH
33,985,559.45
#REF!
JUMLAH
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
272,100.00
20,135,400.0000
#REF!
#REF!
22,200,000.00
#REF!
JUMLAH
#REF!
22,259,250.00
884,325.00
20,189,139.7500
13,344,000.00
1,008,584.00
12,103,008.0000
JUMLAH
35,603,250.00
#REF!
#REF!
JUMLAH
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#VALUE!
-
TOTAL HARGA
SUB TOTAL
#VALUE!
SATUAN
HARGA SATUAN
#VALUE!
( Rp )
( Rp )
#VALUE!
-
740.0000
7,000,000.00
6,349,000.00
6,349,000.0000
5,000,000.00
4,535,000.00
4,535,000.0000
2,721,000.00
2,721,000.0000
3,000,000.00
JUMLAH
15,000,000.00
#REF!
#REF!
JUMLAH
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3,000,000.00
2,721,000.00
2,721,000.0000
2,700,000.00
2,448,900.00
2,448,900.0000
50,358,000.00
1,087,493.00
45,674,706.0000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
JUMLAH
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
JUMLAH
#REF!
#REF!
16,048,890.00
#REF!
JUMLAH
#REF!
#REF!
#REF!
129,701.00
14,556,343.2300
#REF!
#REF!
#REF!
#REF!
JUMLAH
#REF!
#REF!
#REF!
#REF!
#REF!
16,031,250.00
7,270,171.88
14,540,343.7500
29,390,625.00
2,423,390.63
26,657,296.8750
3,534,375.00
3,205,678.13
3,205,678.1250
2,012,500.00
912,668.75
1,825,337.5000
JUMLAH
50,968,750.00
9,864.0000
TOTAL HARGA
SUB TOTAL
#VALUE!
SATUAN
HARGA SATUAN
#VALUE!
( Rp )
( Rp )
#VALUE!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2,721,000.00
2,721,000.0000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1,814,000.00
1,814,000.0000
3,000,000.00
2,000,000.00
JUMLAH
#REF!
16,000,000.00
2,300,000.00
JUMLAH
18,300,000.00
#REF!
14,512,000.00
14,512,000.0000
2,086,100.00
2,086,100.0000
#VALUE!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
JUMLAH
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
JUMLAH
#REF!
7,000,000.00
6,349,000.00
6,349,000.0000
3,500,000.00
1,587,250.00
3,174,500.0000
6,000,000.00
5,442,000.00
5,442,000.0000
JUMLAH
16,500,000.00
737.68
345.43
345.43
186.92 M'
101.58
0.024
0.0960
220,800.0000
2,400,000,000.0000
2,200,000,000.0000
NO
URAIAN PEKERJAAN
BOBOT
I.
Pembersihan Lokasi
#DIV/0!
#DIV/0!
#DIV/0!
Pengukuran/Pemasangan Bouwplank
#DIV/0!
Mobilisasi/De-Mobilisasi
#DIV/0!
#DIV/0!
#DIV/0!
B.
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
C.
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
100.000
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
Plesteran Bata 1 : 4
#REF!
10
Plesteran Relief
#REF!
11
#REF!
D.
PEKERJAAN BESI
#DIV/0!
#DIV/0!
E.
PEKERJAAN CAT
Cat Dinding/Tembok
#REF!
Cat Besi
#REF!
II
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
80.000
Pekerjaan Persiapan
1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pekerjaan Tanah
1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
60.000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Plesteran dinding 1 : 4
#REF!
#REF!
#REF!
#REF!
10
#REF!
11
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pekerjaan Atap
1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pekerjaan Plafond
1
#REF!
#REF!
#REF!
40.000
Pekerjaan Pengecatan
1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
20.000
#REF!
#REF!
#REF!
Saklar Tunggal
#REF!
Saklar Ganda
#REF!
Stop Kontak
#REF!
MCB
#REF!
10
#REF!
#REF!
Pembersihan Akhir
#REF!
III
20.000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pembersihan Akhir
JUMLAH bobot
Akumulasi bobot Rencana
#REF!
100.000
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10
11
12
13
14
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
15
#DIV/0!
#DIV/0!
16
17
18
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
19
20
HARI KE :
37
38
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
39
40
41
42
43
44
45
46
47
48
49
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
50
51
52
53
54
55
56
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
57
#REF!
58
59
#REF!
60
61
62
63
64
65
66
67
#REF!
#REF!
68
69
70
#REF!
#REF!
71
72
73
#REF!
#REF!
74
75
76
#REF!
#REF!
77
78
79
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
19
#DIV/0!
#DIV/0!
20
#DIV/0!
#DIV/0!
21
22
23
24
25
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
26
#DIV/0!
#DIV/0!
27
28
29
30
31
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
32
#DIV/0!
#DIV/0!
33
34
35
36
#DIV/0!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
37
#REF!
#DIV/0!
38
#REF!
#DIV/0!
39
40
41
42
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
43
#REF!
#DIV/0!
44
#REF!
#DIV/0!
45
46
47
48
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
49
#REF!
#DIV/0!
50
#REF!
#DIV/0!
51
52
53
#REF!
#REF!
#DIV/0!
#DIV/0!
54
#REF!
#DIV/0!
55
#REF!
#DIV/0!
56
57
58
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
18
#REF!
59
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
60
#REF!
#DIV/0!
#REF!
61
#REF!
#DIV/0!
#REF!
62
63
#REF!
64
#REF!
65
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
66
#REF!
#DIV/0!
#REF!
67
#REF!
#DIV/0!
68
69
70
#REF!
#REF!
#DIV/0!
#DIV/0!
71
80
#REF!
81
#REF!
82
#REF!
83
#REF!
84
#REF!
85
#REF!
86
#REF!
87
#REF!
88
#REF!
89
#REF!
90
#REF!
91
#REF!
92
#REF!
93
94
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
95
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
70
71
#REF!
#DIV/0!
72
#REF!
#DIV/0!
73
#REF!
#DIV/0!
74
75
76
77
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
78
#REF!
#DIV/0!
79
#REF!
#DIV/0!
80
81
82
83
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
84
#REF!
#DIV/0!
85
86
87
88
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
89
#REF!
#DIV/0!
90
#REF!
#DIV/0!
91
92
93
94
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
95
#REF!
#DIV/0!
96
#REF!
#DIV/0!
97
98
99
100
101
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
102
#DIV/0!
#DIV/0!
103
104
105
106
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
107
#DIV/0!
#DIV/0!
108
109
110
111
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
112
#REF!
#DIV/0!
#REF!
113
114
#REF!
115
#REF!
116
#REF!
#REF!
#REF!
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
117
#REF!
#DIV/0!
#REF!
118
119
#DIV/0!
#DIV/0!
#REF!
120
#DIV/0!
100.000
\
PROYEK : PEMBANGUNAN SARANA DAN PRASARANA
KANTOR BEA CUKAI TYPE B SELAT PANJANG
NO
1
I
NOTA
TANGGAL
2
3
PRA KONSTRUKSI
1 kwitansi
17/07/2011
2 Nota cash
3 Nota Cash
4 CASH
20/07/2011
21/07/2011
5 TK 011101548219/08/2011
6 N0. 0232
7 No. 003642
25/08/2011
26/08/2011
8 Tiket
26/08/2011
9 Tiket
27/08/2011
URAIAN
4
biaya Perjalanan Bp. Antoni dari BengkuluPekanbaru-Selat Panjang-Batam
(Pinjaman dari bp. Jannes Simbolon)
Pencetakan Stempel
Pembuatan Stempel
Biaya Penginapan Bp. Antoni Artng
selama 4 hari
Pembelian Tiket a/n Jannes Simbolon
Pku-BTH (Pembuatan Akte Kuasa Dir)
Biaya pembuatan Akta kuasa Direktur
Biaya Penginapan Bp. Antoni Artng
dan bpk jannes S
Pembelian Tiket 2 buah bth - slt pnjng
utk bp. JANNES & ANTONI
Pembelian Tiket fery Selat pnjng-pku
a/n Jannes simbolon
KREDIT
5
DEBIT
6
3,500,000.00
100,000.00
120,000.00
599,600.00
485,000.00
500,000.00
168,000.00
300,000.00
100,000.00
5,872,600.00
SALDO
7
B.
311.51 m1
74 bh
289.31 m'
Galian tanah
cerucuk
Pasir Urug
cor tapak plat
cor kolom 30x30 h=2m
80.20
370.00
2.67
10.74
18.71
m3
btg
m3
m3
m3
1.91
20.62
66.68
74.00
179.46
179.46
m3
m3
m3
bh
m2
m2
130.00
1,736.00
9.00
60.00
61.00
13.02
222.17
480.66
480.66
26.83
12.00
32.20
m3
btg
m3
m3
m3
m3
m2
m2
m2
m'
m'
m2
Urugan Kembali
relief kolom (kepala & dinding)
plesteran kolom
cat tembok
Galian tanah
cerucuk
Pasir Urug
Pas. Bat. Kali
Urugan Kembali
Sloof 15x30
Pas. Bata 1/2 batu h. 65cm
Plesteran
cat tembok
Besi hollow utk. Pagar depan h.120
pintu gerbang besi hollow h.200
cat besi hollow
m3
0.09
0.56
0.56
0.56
0.33
0.56
0.1
0.2
0.03 m3
0.11 m3
8.68
1157.24
34.56
34.56
660.12
660.12
80.49
102.69
m2