Anda di halaman 1dari 4

NO URAIAN PEKERJAAN VOLUME SATUAN

I PEKERJAAN PENDAHULUAN
1 Pek.Pembersihan lapangan 37.5 M²

2 Pek.Pengukuran & pemasangan bowplank 35.0 M¹

II PEKERJAAN TANAH PASIR


1 Pek.Galian tanah kuku semenisasi 0.30 M³

2 Pek.Urugan pasir 1.875 M³

III PEKERJAAN SEMENISASI


1 Pek.Pemasangan papan mal semenisasi 6.25 M²
2 Pek.Cor semenisasi beton adk.1:2: tebal 15 cm 6.01 M³
HASIL HITUNGAN
VOLUME PEKERJAAN

Panjang = 15 m¹
Lebar = 2.5 m¹
Luas = 37.5 m²

Panjang = 15 m¹
Lebar = 2.5 m¹
Jumlah = 2 Bh
Volume = 35 m¹

Panjang = 15 m¹
Lebar = 0.1 m¹
Tinggi = 0.1 m¹
Jumlah = 2 Bh
Volume = 0.3 m³

Panjang = 15 m¹
Lebar = 2.5 m¹
Tinggi = 0.05 m¹
Volume = 1.875 m³

Volume Papan Mal


Panjang = 15 m¹
Lebar = 0.15 m¹
Jumlah = 2 Bh
Volume = 4.5 m²

Volume Papan Deletase


Panjang = 2.5 m¹
Lebar = 0.1 m¹
Jumlah = 7 Bh
Volume = 1.75 m²

Cor Kuku Semenisasi


Panjang = 15 m¹
Lebar = 0.1 m¹
Tinggi = 0.15 m¹
Jumlah = 2 Bh
Volume = 0.45 m³

Cor Semenisasi Utama


Panjang = 15 m¹
Lebar = 2.5 m¹
Tebal = 0.15 m¹
Volume = 5.625 m³

Volume Papan Deletase


Panjang = 2.5 m¹
Lebar = 0.15 m¹
Tebal = 0.025 m¹
Jumlah = 7 Bh
Volume = 0.07 m³

Anda mungkin juga menyukai