HARGA
NO TENAGA KERJA / MATERIAL SATUAN (Rp)
A. UPAH
1 Mandor Org/hari 95,000.00
2 Kepala Tukang Org/hari 83,800.00
3 Tukang Org/hari 64,800.00
4 Pekerja Org/hari 62,400.00
-
B. BAHAN PENGISI -
1 Pasir Urug M 187,700.00
4 Batu pecah 15/20 cm M 386,200.00
6 Batu pecah 1/2 cm M 683,600.00
7 Pasir M 238,700.00
8 Semen PC Zak 78,700.00
9 Semen PC Kg 1,500.00
10 Semen Warna Kg 2,500.00
10 Bataco 20 x 40 x 7 cm Bh 2,000.00
11 Keramik 20 x 20 cm Kotak 49,000.00
12 Keramik 30 x 30 cm Kotak 59,000.00
C. BAHAN KAYU -
1 Ky. klas I M 3,746,600.00
2 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M 2,479,700.00
3 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M 2,479,700.00
4 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M 1,954,400.00
5 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M 1,954,400.00
6 Papan kayu klas II (mabang) tdk ketam M 2,556,900.00
7 Papan kayu klas II (mabang) ketam M 2,634,200.00
8 Papan kayu klas I tdk ketam M 3,553,500.00
9 Papan kayu klas I ketam M 3,630,700.00
10 Papan mal klas III M 1,492,400.00
11 Kayu cerucuk /dolken 6 - 8 - Pj. 4 M Btg 7,600.00
12 Kayu cerucuk /dolken 10 - Pj. 4 M Btg 9,200.00
-
D. BAHAN CAT -
1 Amplas Lbr 1,900.00
2 Cat dasar kayu Kg 21,700.00
3 Cat dasar tembok Kg 21,700.00
4 Cat kilat Kg 46,600.00
5 Cat tembok Kg 14,600.00
6 Dempul kayu Kg 14,200.00
7 Dempul tembok Kg 14,200.00
8 Plamur Kg 12,400.00
9 Thiner Ltr 6,300.00
10 Meni Kg 21,700.00
11 Kuas 4" Bh 9,200.00
-
E. BAHAN KAWAT DAN PAKU -
1 Besi Tulangan Beton Kg 15,200.00
2 Kawat baja/bendrat Kg 15,200.00
7 Besi Strip T.5mm Kg 15,200.00
4 Paku Seng Kg 21,600.00
5 Paku campuran 1" - 5 " Kg 15,800.00
7 Paku Atap Seng Kg 19,300.00
8 Paku triplek Kg 16,900.00
9 Paku GRC Kg 19,300.00
-
F. BAHAN ATAP -
1 Genteng Metal 0.25 Lbr 37,400.00
2 Metal Plat 0.30 Lbr 45,100.00
-
G. BAHAN TRIPLEK -
1 Panel GRC 120 x 240 x 4mm Lbr 61,000.00
2 Multiplek 9 mm Lbr 137,600.00
ANALISA HARGA SATUAN PEKERJAAN
Harga Satuan
No. Uraian Kode Satuan Koefesien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5.000 6.00 7.00
A TENAGA
1 Pekerja L.01 OH 0.250 62,400.00 15,600.00
2 Mandor L.04 OH 0.008 95,000.00 760.00
JUMLAH TENAGA KERJA 16,360.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
A.4.1.1.5. Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
Harga Satuan
No. Uraian Kode Satuan Koefesien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5.000 6.00 7.00
A TENAGA
1 Pekerja L.01 OH 1.650 62,400.00 102,960.00
2 Tukang Kayu L.02 OH 0.275 64,800.00 17,820.00
3 Kepala Tukang L.03 OH 0.028 83,800.00 2,346.40
4 Mandor L.04 OH 0.083 95,000.00 7,885.00
JUMLAH TENAGA KERJA 131,011.40
B BAHAN
1 Semen Portland Kg 326.000 1,500.00 489,000.00
2 Pasir Beton Kg 760.000 170.50 129,580.00
3 Kerikil (Maks 30mm) Kg 1,029.000 506.37 521,055.11
4 Air Liter 215.000 - -
JUMLAH HARGA BAHAN 1,139,635.11
C PERALATAN
1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 7/7 (P.K. 07)
Harga Satuan
No. Uraian Kode Satuan Koefesien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5.000 6.00 7.00
A TENAGA
1 Pekerja L.01 OH 8.000 62,400.00 499,200.00
2 Tukang Kayu L.02 OH 24.000 64,800.00 1,555,200.00
3 Kepala Tukang L.03 OH 2.400 83,800.00 201,120.00
4 Mandor L.04 OH 0.400 95,000.00 38,000.00
JUMLAH TENAGA KERJA 2,293,520.00
B BAHAN
1 Balok kayu Klas I M3 1.100 3,746,600.00 4,121,260.00
2 Paku Kg 6.000 15,800.00 94,800.00
JUMLAH HARGA BAHAN 4,216,060.00
C PERALATAN
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Harga Satuan
No. Uraian Kode Satuan Koefesien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5.000 6.00 7.00
A TENAGA
1 Pekerja L.01 OH 4.000 62,400.00 249,600.00
2 Tukang Kayu L.02 OH 12.000 64,800.00 777,600.00
3 Kepala Tukang L.03 OH 1.200 83,800.00 100,560.00
4 Mandor L.04 OH 0.120 95,000.00 11,400.00
JUMLAH TENAGA KERJA 1,139,160.00
B BAHAN
1 Balok kayu Klas II M3 1.100 2,479,700.00 2,727,670.00
2 Besi strip tebal 5mm Kg 15.000 15,200.00 228,000.00
3 Paku 12 cm Kg 5.600 15,800.00 88,480.00
JUMLAH HARGA BAHAN 3,044,150.00
C PERALATAN
1m2 Pasang Kasau + Reng Atap Genteng Metal Kayu Kelas II (P.K. 28)
Harga Satuan
No. Uraian Kode Satuan Koefesien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5.000 6.00 7.00
A TENAGA
1 Pekerja L.01 OH 0.100 62,400.00 6,240.00
2 Tukang Kayu L.02 OH 0.100 64,800.00 6,480.00
3 Kepala Tukang L.03 OH 0.010 83,800.00 838.00
4 Mandor L.04 OH 0.005 95,000.00 475.00
JUMLAH TENAGA KERJA 14,033.00
B BAHAN
1 Kayu Klas II M3 0.014 1,954,400.00 27,361.60
2 Paku 5 dan 10 cm Kg 0.150 15,800.00 2,370.00
JUMLAH HARGA BAHAN 29,731.60
C PERALATAN
A.4.6.1.21. Pemasangan 1 m lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Harga Satuan
No. Uraian Kode Satuan Koefesien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5.000 6.00 7.00
A TENAGA
1 Pekerja L.01 OH 0.100 62,400.00 6,240.00
2 Tukang Kayu L.02 OH 0.200 64,800.00 12,960.00
3 Kepala Tukang L.03 OH 0.020 83,800.00 1,676.00
4 Mandor L.04 OH 0.005 95,000.00 475.00
JUMLAH TENAGA KERJA 21,351.00
B BAHAN
1 Papan kayu M3 0.011 2,634,200.00 28,449.36
2 Paku 5 dan 10 cm Kg 0.100 15,800.00 1,580.00
JUMLAH HARGA BAHAN 30,029.36
C PERALATAN
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No. Uraian Kode Satuan Koefesien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5.000 6.00 7.00
A TENAGA
1 Pekerja L.01 OH 0.070 62,400.00 4,368.00
2 Tukang Cat L.02 OH 0.009 64,800.00 583.20
3 Kepala Tukang L.03 OH 0.060 83,800.00 5,028.00
4 Mandor L.04 OH 0.030 95,000.00 2,850.00
JUMLAH TENAGA KERJA 12,829.20
B BAHAN
1 Cat menie Kg 0.200 21,700.00 4,340.00
2 Plamur Kg 0.150 12,400.00 1,860.00
3 Cat dasar Kg 0.170 21,700.00 3,689.00
4 Cat penutup Kg 0.260 46,600.00 12,116.00
5 Kuas Buah 0.010 9,200.00 92.00
6 Pengencer Kg 0.020 6,300.00 126.00
7 Ampelas Lembar 0.200 1,900.00 380.00
JUMLAH HARGA BAHAN 22,603.00
C PERALATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No. Uraian Kode Satuan Koefesien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5.000 6.00 7.00
A TENAGA
1 Pekerja L.01 OH 0.020 62,400.00 1,248.00
2 Tukang Cat L.02 OH 0.063 64,800.00 4,082.40
3 Kepala Tukang L.03 OH 0.006 83,800.00 527.94
4 Mandor L.04 OH 0.003 95,000.00 285.00
JUMLAH TENAGA KERJA 6,143.34
B BAHAN
1 Plamur Kg 0.100 12,400.00 1,240.00
2 Cat dasar Kg 0.100 21,700.00 2,170.00
3 Cat penutup Kg 0.260 14,600.00 3,796.00
JUMLAH HARGA BAHAN 7,206.00
C PERALATAN
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No. Uraian Kode Satuan Koefesien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5.000 6.00 7.00
A TENAGA
1 Pekerja L.01 OH 0.028 62,400.00 1,747.20
2 Tukang Cat L.02 OH 0.042 64,800.00 2,721.60
3 Kepala Tukang L.03 OH 0.004 83,800.00 351.96
4 Mandor L.04 OH 0.003 95,000.00 285.00
JUMLAH TENAGA KERJA 5,105.76
B BAHAN
1 Cat dasar Kg 0.120 21,700.00 2,604.00
2 Cat penutup Kg 0.180 14,600.00 2,628.00
JUMLAH HARGA BAHAN 5,232.00
C PERALATAN
A.4.7.1.4. A .1 m2 Pengecatan bidang kayu lama ( 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No. Uraian Kode Satuan Koefesien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5.000 6.00 7.00
A TENAGA
1 Pekerja L.01 OH 0.070 62,400.00 4,368.00
2 Tukang Cat L.02 OH 0.009 64,800.00 583.20
3 Kepala Tukang L.03 OH 0.060 83,800.00 5,028.00
4 Mandor L.04 OH 0.030 95,000.00 2,850.00
JUMLAH TENAGA KERJA 12,829.20
B BAHAN
1 Cat menie Kg 0.200 - -
2 Plamur Kg 0.150 - -
3 Cat dasar Kg 0.170 21,700.00 3,689.00
4 Cat penutup Kg 0.260 46,600.00 12,116.00
5 Kuas Buah 0.010 9,200.00 92.00
6 Pengencer Kg 0.020 6,300.00 126.00
7 Ampelas Lembar 0.200 1,900.00 380.00
JUMLAH HARGA BAHAN 16,403.00
C PERALATAN
REKAPITULASI
RENCANA ANGGARAN BIAYA
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp)
1 2 3
Dibuat
Diperiksa Konsultan Perencana
Pengelola Teknis CV. SKETSA MULTIGUNA
YOELYANTO, ST ASWANDI, ST
Nip.19720124 200312 1 002 Perencana
Mengetahui Menyetujui
Kepala Dinas Kesehatan Pejabat Pembuat Komitmen (PPK)
Kabupaten Sambas
A PEK. PENDAHULUAN
1 Pembersihan lokasi 1 30 35 1050 1050 M2
2 Pengukuran & pemasangan Bouwplank 1 25 25 50 50 M'
3 Direksi keet & gudang 1 1 Lsm
B PEK. PONDASI
1 Galian Tanah
Pondasi P1 LAJUR 1 295.00 0.80 0.50 118.00 118.00 M3
Pondasi P2 1 8.70 0.20 0.50 0.87 0.87 M3
Sub galian tanah 118.87 M3
Kolom Praktis 10 x 10 cm
- Cor beton camp 1:2:3 19 0.10 0.10 3.85 0.04 0.76 M3
- Tulangan Pokok dia. 10 mm -4 btg 19 4.15 4 0.62 10.23 194.37 Kg
- Tulangan Sengkang dia.6 mm - 15 cm 19 0.40 29.00 0.22 2.57 48.83 Kg
Sub pembesian kolom pondasi 243.20 Kg
- Bekesting 19 0.10 0.10 3.85 1.54 29.26 M2
- Plasteran 19 0.10 0.10 3.85 0.77 14.63 M2
V3 4 Unit
- Kusen kayu klas I 4 7.50 0.05 0.10 0.038 0.15 M3
- Ventilasi Jalusi 8 Buah 0.80 0.60 0.48 3.84 M2
Sub Luas V2 3.84 M2
TOTAL 100.00
Bobot Rencana Mingguan 0.83 5.05
Bobot Rencana Kumulatif 0 0.83 5.88
Bobot Realisai Kumulatif 0.00 0.00
Deviasi -0.83 -5.88
WAL KEGIATAN / SHCEDULE KERJA
KURVA "S"
2.94
0.99
1.44
5.05 5.90 13.18 14.53 17.38 11.54 11.36 6.30 6.30 2.57
10.93 16.84 30.02 44.54 61.92 73.47 84.83 91.13 97.43 100.00
0.00 0.00 1.30 11.59 18.64 27.65 47.92 70.97 84.36 100.00
-10.93 -16.84 -28.72 -32.95 -43.28 -45.82 -36.92 -20.16 -13.07 0.00
Dibuat Oleh :
Konsultan Perencana
CV. SKETSA MULTIGUNA
ASWANDI, ST
Perencana
REKAPITULASI AHSP PERMEN No 11-PRT-M-2013
KODE ANALISA JENIS PEKERJAAN
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah
Pengurugan kembali 1 m galian dihitung dari 1/3 kali dari koefisien pekerjaan gali
A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
56,551.25
18,814.00
koefisien pekerjaan galian
291,456.00
1,193,492.43
1,279,392.10
1,461,243.49
19,751.32
145,639.22
263,074.46
269,817.14
91,907.49
55,517.52
PENUTUP DINDING
190,642.24
192,535.99
39,602.55
70,381.15
35,198.63
7,486,017.00
7,087,266.00
4,810,806.50
50,329.29
81,869.33
59,087.41
40,747.03
15,351.74
11888.424
VIII PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Engsel Pintu buah 15.00 ###
2 Engsel Jendela buah 14.00 ###
3 Kunci Pintu 2 slaag buah 8.00 ###
4 Slot Pintu Besar buah 8.00 ###
5 Slot Jendela buah 30.00 ###
6 Tarikan Jendela buah 15.00 ###
7 Kait angin jendela buah 30.00 ###
IX PEKERJAAN SANITASI
1 Instalasi Air Bersih Lsm 1.00 ###
2 Instalasi Air Kotor Lsm 1.00 ###
3 Kloset Jongkok dan Pemasangan buah 1.00 ###
7 Kran Air buah 2.00 ###
8 Floordrain buah 2.00 ###
9 Bak Air (finishing keramik) uk. 70 x 70 T 80 cm buah 1.00 ###
10 Berfoot Gorong -gorong Dia. 1 M. 2 bh Unit 1.00 ###
11 Talang Horizontal dan Pembuangan Pipa PVC dia. 4 " m 16.00 ###
12 Talang Vertikal dan Pembuangan Pipa PVC 2" m 8.00 ###
13 Bak Air Viber 1000 m3 + pipa PVC 3/4 " Bh 1.00 ###
14 Steling bak Viber Ky Belian Unit 1.00 ### Berkurang
XI PEKERJAAN PENGECATAN
1 Cat Tembok Baru m2 363.10 363.10
2 Cat Tembok Lama m2 133.53 ###
3 Cat Kilat Baru m2 43.90 ### Berkurang
4 Cat Kilat Lama m2 146.85 ### Berkurang