Anda di halaman 1dari 39

PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
1 1 M1 PEKERJAAN PASANGAN BOUWPLANK
Kayu Papan 2/20 cm m3 0.0050 - -
Kayu 5/7 m3 0.0050 - - -
Paku 5 - 7 cm kg 0.0100 - -
Cat Meni kg 0.0500 - -
Tukang Kayu org 0.0400 - -
Pekerja org 0.0560 - -
Jumlah Harga - - -
2 1 M2 PAPAN NAMA PROYEK
Kayu Jeungjing m3 0.1300 - -
Paku 5 - 7 cm kg 0.2500 - - -
Cat Minyak ls 1.0000 - -
Penulisan ls 1.0000 - -
Ongkos Pasang ls 1.0000 - -
Jumlah Harga - - -
3 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1 M 1
Tukang Gali org 0.4000 - - -
Alat Bantu ls 1.0000 - -
Jumlah Harga - - -
4 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 2 M 1
Tukang Gali org 0.5260 - - -
Alat Bantu ls 1.0000 - - -
Jumlah Harga - - -
5 1 M3 PEK. GALIAN TANAH BERBATU / TANAH KERAS MAX. KEDALAMAN 1 M 1
Tukang Gali org 0.6250 - - -
Alat Bantu ls 1.0000 - - -
Jumlah Harga - - -
6 1 M3 PEK. GALIAN TANAH CADAS MAX. KEDALAMAN 1 M 1
Tukang Gali org 0.7500 - - -
Alat Bantu ls 1.0000 - - -
Jumlah Harga - - -
7 1 M3 PEK. GALIAN TANAH LUMPUR MAX. KEDALAMAN 1 M 1
Tukang Gali org 0.5250 - - -
Alat Bantu ls 1.0000 - - -
Jumlah Harga - - -
8 1 M3 URUGAN TANAH KEMBALI
Untuk Item ini menggunakan Koefesien 25 % x Analisa Galian Tanah
9 1 M3 PEMADATAN TANAH SETIAP 20 cm
Alat Bantu (Stamper) ls 1.0000 - - -
Tukang Gali org 0.5000 - - -
Jumlah Harga - - -
10 1 M2 PEMASANGAN LAPISAN INJUK T = 10 cm
Injuk kg 6.0000 - -
Pekerja org 0.1500 - - -
Jumlah Harga - - -
11 1 M3 PEK. GALIAN TANAH SUMURAN MAX. KEDALAMAN 10 M 1
Tukang Gali org 1.1500 - - -
Alat Bantu ls 1.0000 - - -
Jumlah Harga - - -
12 1 M3 PEKERJAAN URUGAN PASIR URUG
Pasir Urug m3 1.2000 - -
Pekerja org 0.1500 - - -
Jumlah Harga - - -
13 1 M3 LANTAI KERJA 1 Pc : 3 Ps : 5 Kr
PC. (50 kg) zak 3.9560 - -
Pasir Beton Cimalaka m3 0.5500 - -
Split Pecah Mesin 2/3 m3 0.9300 - -
Pekerja org 2.0000 - - -
Tukang Batu org 0.5000 - - -
Jumlah Harga - - -
14 1 M3 COR BETON 1Pc : 2Ps : 3Kr SITE MIX K-175
PC. (50 kg) zak 6.8000 - - -
Pasir Beton Cimalaka m3 0.5400 - - -
Split Pecah Mesin 2/3 m3 0.8300 - - -
Pekerja org 1.5000 - - -
Tukang Batu org 0.5000 - - -
Jumlah Harga - - -

file/AHS/Ipeng/2007 1 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
15 1 M3 COR BETON 1 Pc : 1,5 Ps : 2,5 Kr SITE MIX K-225
PC. (50 kg) zak 7.8960 - - -
Pasir Beton Cimalaka m3 0.4900 - - -
Split Pecah Mesin 2/3 m3 0.8100 - - -
Pekerja org 1.5000 - - -
Tukang Batu org 0.5000 - - -
Jumlah Harga - - -
16 1 KG BESI BETON TERPASANG U-24
Besi Beton rata-rata 8mm - 16mm kg 1.0500 - -
Kawat Beton kg 0.0100 - -
Pekerja org 0.0250 - - -
Tukang Besi Beton org 0.0150 - - -
Jumlah Harga - - -
17 1 M2 BEKISTING DENGAN PAPAN
Kaso 5/7, 2 x pakai (50%) m3 0.0170 - - -
Papan Terentang, 2 x pakai (50%) m3 0.0240 - - -
Paku 5 cm kg 0.4000 - - -
Pekerja org 0.1200 - - -
Tukang Kayu org 0.1500 - - -
Jumlah Harga - - -
18 1 M2 PASANGAN STOOT WERK
Kaso 5/7 (2 x pakai), 50% m3 0.0945 - -
Papan Terentang (2 x pakai), 50% m3 0.0160 - - -
Paku 5 cm kg 0.5000 - - -
Pekerja org 0.1500 - - -
Tukang Kayu org 0.2000 - - -
Jumlah Harga - - -
19 1 M3 PEKERJAAN AANSTAMPING BATU KALI
Batu Belah m3 1.2000 - -
Pasir Urug m3 0.1000 - - -
Pekerja org 0.5000 - - -
Tukang Batu org 0.5625 - - -
Jumlah Harga - - -
20 1 M3 PEKERJAAN PASANGAN BATU KALI 1 : 2
Batu Belah m3 1.2000 - - -
PC. (50 kg) zak 3.5200 - - -
Pasir Pasang m3 0.3800 - -
Pekerja org 2.2500 - - -
Tukang Batu org 1.1250 - - -
Jumlah Harga - - -
21 1 M3 PEKERJAAN PASANGAN BATU KALI 1 : 2,5
Batu Belah m3 1.2000 - - -
PC. (50 kg) zak 3.1800 - - -
Pasir Pasang m3 0.3900 - - -
Pekerja org 2.2500 - - -
Tukang Batu org 1.1250 - - -
Jumlah Harga - - -
22 1 M3 PEKERJAAN PASANGAN BATU KALI 1 : 3
Batu Belah m3 1.2000 - - -
PC. (50 kg) zak 2.8400 - - -
Pasir Pasang m3 0.4000 - - -
Pekerja org 2.2500 - - -
Tukang Batu org 1.1250 - - -
Jumlah Harga - - -
23 1 M3 PEKERJAAN PASANGAN BATU KALI 1 : 4
Batu Belah m3 1.2000 - - -
PC. (50 kg) zak 2.5000 - - -
Pasir Pasang m3 0.4200 - - -
Pekerja org 2.2500 - - -
Tukang Batu org 1.1250 - - -
Jumlah Harga - - -
24 1 M3 PEKERJAAN PASANGAN BATU KALI 1 : 5
Batu Belah m3 1.2000 - - -
PC. (50 kg) zak 2.1600 - - -
Pasir Pasang m3 0.4400 - - -
Pekerja org 2.2500 - - -
Tukang Batu org 1.1250 - - -
Jumlah Harga - - -

file/AHS/Ipeng/2007 2 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
25 1 M3 PEKERJAAN PASANGAN BATU KALI 1 : 6
Batu Belah m3 1.2000 - - -
PC. (50 kg) zak 1.8880 - - -
Pasir Pasang m3 0.4800 - - -
Pekerja org 2.2500 - - -
Tukang Batu org 1.1250 - - -
Jumlah Harga - - -
26 1 M2 PASANGAN PAVING BLOCK T = 6 CM
Paving Block Natural t = 6 cm m2 1.0100 - -
Pasir Beton Cimalaka m3 0.1000 - - -
Pekerja org 0.2500 - - -
Tukang Batu org 0.5000 - - -
Jumlah Harga - - -
27 1 M2 LANTAI KERAMIK POLOS
Keramik Lantai Kw. I m2 1.0100 - -
PC. (50 kg) zak 0.1600 - - -
Pasir Pasang m3 0.0300 - - -
Semen Warna zak 0.0130 - -
Pekerja org 0.1875 - - -
Tukang Batu org 0.3750 - - -
Jumlah Harga - - -
28 1 M2 LANTAI KERAMIK BERCORAK / ANTI SLIP KAMAR MANDI
Keramik Lantai Kw. I m2 1.0100 - - -
PC. (50 kg) zak 0.2400 - - -
Pasir Pasang m3 0.0300 - - -
Semen Warna zak 0.0130 - - -
Pekerja org 0.1875 - - -
Tukang Batu org 0.3750 - - -
Jumlah Harga - - -
29 1 M2 PASANGAN BATA MERAH 1 : 2
Bata Merah bh 70.0000 - -
PC. (50 kg) zak 0.5440 - - -
Pasir Pasang m3 0.0470 - - -
Pekerja org 0.4290 - - -
Tukang Batu org 0.2140 - - -
Jumlah Harga - - -
30 1 M2 PASANGAN BATA MERAH 1 : 3
Bata Merah bh 70.0000 - - -
PC. (50 kg) zak 0.4200 - - -
Pasir Pasang m3 0.0540 - - -
Pekerja org 0.4290 - - -
Tukang Batu org 0.2140 - - -
Jumlah Harga - - -
31 1 M2 PASANGAN BATA MERAH 1 : 4
Bata Merah bh 70.0000 - - -
PC. (50 kg) zak 0.3354 - - -
Pasir Pasang m3 0.0580 - - -
Pekerja org 0.3218 - - -
Tukang Batu org 0.1805 - - -
Jumlah Harga - - -
32 1 M2 PASANGAN BATA MERAH 1 : 5
Bata Merah bh 70.0000 - - -
PC. (50 kg) zak 0.2074 - - -
Pasir Pasang m3 0.0580 - - -
Pekerja org 0.3218 - - -
Tukang Batu org 0.1805 - - -
Jumlah Harga - - -
33 1 M2 PASANGAN LOSTER BATA 20 x 20 cm
Loster 20 x 20 cm bh 25.0000 - -
PC. (50 kg) zak 0.2594 - - -
Pasir Pasang m3 0.0580 - - -
Pekerja org 0.3218 - - -
Tukang Batu org 0.1805 - - -
Jumlah Harga - - -
34 1 M2 PLESTERAN DINDING 1 : 2 + ACIAN
PC. (50 kg) zak 0.2368 - - -
Pasir Pasang m3 0.0190 - - -
Pekerja org 0.2860 - - -
Tukang Batu org 0.2140 - - -

file/AHS/Ipeng/2007 3 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
Jumlah Harga - - -

file/AHS/Ipeng/2007 4 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
35 1 M2 PLESTERAN DINDING 1 : 3 + ACIAN
PC. (50 kg) zak 0.1600 - - -
Pasir Pasang m3 0.0190 - - -
Pekerja org 0.2860 - - -
Tukang Batu org 0.2140 - - -
Jumlah Harga - - -
36 1 M2 PLESTERAN DINDING 1 : 4 + ACIAN
PC. (50 kg) zak 0.1404 - - -
Pasir Pasang m3 0.0190 - - -
Pekerja org 0.2860 - - -
Tukang Batu org 0.2140 - - -
Jumlah Harga - - -
37 1 M2 PLESTERAN DINDING 1 : 5 + ACIAN
PC. (50 kg) zak 0.1000 - - -
Pasir Pasang m3 0.0190 - - -
Pekerja org 0.2860 - - -
Tukang Batu org 0.2140 - - -
Jumlah Harga - - -
38 1 M2 ACIAN PC
PC. (50 kg) zak 0.0800 - - -
Pekerja org 0.1430 - - -
Tukang Batu org 0.1070 - - -
Jumlah Harga - - -
39 1 M2 PENGECATAN DINDING (3x)
Cat Tembok kg 0.1750 - -
Plamuur Tembok kg 0.1600 - -
Rol Cat bh 0.0100 - -
Hampelas lbr 0.2000 - -
Pekerja org 0.1600 - - -
Tukang Cat org 0.2800 - - -
Jumlah Harga - - -
40 1 M2 PENGECATAN DINDING INTERIOR DAN BETON EKSTERIOR (3x)
Cat Tembok kg 0.2500 - - -
Cat Dasar / Alkali ICI kg 0.1250 - -
Rol Cat bh 0.0100 - - -
Hampelas lbr 0.2000 - - -
Pekerja org 0.1600 - - -
Tukang Cat org 0.2800 - - -
Jumlah Harga - - -
41 1 M2 PENGECATAN PLAFOND (3x)
Cat Tembok kg 0.2000 - - -
Plamuur Tembok kg 0.1600 - - -
Steger Werk ls 1.0000 - - -
Rol Cat bh 0.0100 - - -
Hampelas lbr 0.2000 - - -
Pekerja org 0.2000 - - -
Tukang Cat org 0.2800 - - -
Jumlah Harga - - -
42 1 M2 PENGECATAN KAYU SEIV + MENIE (3x)
Meni Kayu kg 0.1670 - -
Plamuur Kayu kg 0.0830 - -
Cat Kayu Merk SEIV kg 0.2000 - -
Hampelas lbr 0.1500 - - -
Minyak Cat Terpentin ltr 0.1500 - -
Kwas 3 - 4" bh 0.0500 - -
Pekerja org 0.2000 - - -
Tukang Cat org 0.3000 - - -
Jumlah Harga - - -
43 1 M2 PENGECATAN BESI (3x)
Meni Besi kg 0.1670 - - -
Cat Besi Merk SEIV kg 0.2000 - - -
Hampelas Besi lbr 0.1500 - - -
Minyak Cat Thiner A ltr 0.1500 - - -
Kwas 3 - 4" bh 0.0500 - - -
Pekerja org 0.2000 - - -
Tukang Cat org 0.3000 - - -
Jumlah Harga - - -

file/AHS/Ipeng/2007 5 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
44 1 M2 PLITURAN BANGUNAN (BIASA)
Dempul Plitur (Dempul Kasar) kg 0.0300 - -
Wood Filler (Impra) kg 0.2000 - -
Plitur Jadi AXI kg 0.4000 - -
Batu Gosok kg 0.0100 - -
Hampelas Kayu lbr 0.1500 - - -
Pekerja org 0.2260 - - -
Tukang Cat org 0.2300 - - -
Jumlah Harga - - -
45 1 M2 SOLIGNEM RANGKA ATAP
Solignem kg 0.2000 - -
Minyak Tanah ltr 0.0300 - -
Kwas 3 - 4" bh 0.0100 - - -
Pekerja org 0.1000 - - -
Jumlah Harga - - -
46 1 M2 PASANGAN RANGKA PLAFOND
Kaso - kaso 5/7 m3 0.0140 - -
Kayu 5/10 m3 0.0035 - -
Paku kg 0.2200 - - -
Pekerja org 0.1875 - - -
Tukang Kayu org 0.1000 - - -
Jumlah Harga - - -
47 1 M2 PASANGAN PLAFOND TRIPLEK 4 MM
Triplek 4 mm lbr 0.3472 - -
Paku Tripleks kg 0.0200 - - -
Pekerja org 0.0473 - - -
Tukang Kayu org 0.1125 - - -
Jumlah Harga - - -
48 1 M3 PEKERJAAN KUSEN
Kayu 6/15 m3 1.1000 - -
Paku kg 1.2500 - - -
Lem Putih (FOX) kg 1.0000 - -
Pekerja org 4.0000 - - -
Tukang Kayu org 15.5000 - - -
Jumlah Harga - - -
49 1 M2 DAUN PINTU PANIL
Rangka Kayu 4/30 m3 0.0500 - -
Lem Putih (FOX) kg 0.7500 - - -
List Profil m1 4.0000 - -
Pekerja org 0.6000 - - -
Tukang Kayu org 2.6000 - - -
Jumlah Harga - - -
50 1 M2 DAUN JENDELA KACA (TANPA KACA)
Rangka Kayu 3/30 m3 0.0170 - - -
Lem Putih (FOX) kg 0.3000 - - -
List Kayu m1 4.0000 - - -
Pekerja org 0.3000 - - -
Tukang Kayu org 1.2000 - - -
Jumlah Harga - - -
51 1 M2 DAUN PINTU KACA (TANPA KACA)
Rangka Kayu 3/30 m3 0.0200 - - -
Lem Putih (FOX) kg 0.6000 - - -
List Kayu m1 4.0000 - - -
Pekerja org 0.4000 - - -
Tukang Kayu org 1.4000 - - -
Jumlah Harga - - -
52 1 M2 DAUN PINTU / JENDELA JALUSI
Rangka Kayu 3/30 m3 0.0170 - - -
Lem Putih (FOX) kg 0.3000 - - -
Jalusi Kayu (1 m2 = 15 m1) m3 0.0225 - -
List Kayu m1 4.0000 - - -
Pekerja org 0.7000 - - -
Tukang Kayu org 1.8000 - - -
Jumlah Harga - - -
53 1 M2 PEKERJAAN JALUSI MATI
Kayu Papan m3 0.0370 - - -
Paku kg 0.1500 - - -
Pekerja org 0.5000 - - -
Tukang Kayu org 2.0000 - - -

file/AHS/Ipeng/2007 6 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
Jumlah Harga - - -

file/AHS/Ipeng/2007 7 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
54 1 M3 KUDA-KUDA OVERSTEK/KONSOL (EKSPOSE)
Kayu Balok m3 1.2000 - -
Paku kg 5.8000 - - -
Pekerja org 3.0000 - - -
Tukang Kayu org 9.0000 - - -
Jumlah Harga - - -
55 1 M3 KUDA-KUDA
Kayu m3 1.1000 - - -
Paku kg 5.8000 - - -
Pekerja org 3.0000 - - -
Tukang Kayu org 5.0000 - - -
Jumlah Harga - - -
56 1 M3 IKATAN ANGIN, SILANG GEMPA KAYU RASAMALA
Kayu m3 1.0500 - - -
Paku kg 5.8000 - - -
Pekerja org 2.0000 - - -
Tukang Kayu org 4.5000 - - -
Jumlah Harga - - -
57 1 M3 GORDING, MURPLAT KAYU RASAMALA
Kayu m3 1.0500 - - -
Paku kg 5.8000 - - -
Pekerja org 2.0000 - - -
Tukang Kayu org 4.5000 - - -
Jumlah Harga - - -
58 1 M2 RANGKA ATAP GENTENG BETON / KERAMIK (HANYA RANGKA)
Kaso Kaso 5/7 m3 0.0168 - - -
Reng Kayu 3/4 m1 4.0000 - -
Paku kg 0.2500 - - -
Pekerja org 0.1500 - - -
Tukang Kayu org 0.1500 - - -
Jumlah Harga - - -
59 1 M2 RANGKA ATAP GENTENG PLENTONG (HANYA RANGKA)
Kaso Kaso 5/7 m3 0.0168 - - -
Reng Kayu 2/3 m1 4.0000 - -
Paku kg 0.2500 - - -
Pekerja org 0.1500 - - -
Tukang Kayu org 0.1500 - - -
Jumlah Harga - - -
60 1 M2 PENUTUP ATAP GENTENG
Genteng Palentong bh 25.0000 - -
Pekerja org 0.1200 - - -
Tukang Kayu org 0.0600 - - -
Jumlah Harga - - -
61 1 M2 PENUTUP ATAP GENTENG BETON/MURANDO GLAZUR
Genteng Palentong bh 20.0000 - -
Pekerja org 0.1200 - - -
Tukang Kayu org 0.0600 - - -
Jumlah Harga - - -
62 1 M2 PENUTUP ATAP GENTENG LAMA/BEKAS
Pekerja org 0.1200 - - -
Tukang Kayu org 0.0600 - - -
Jumlah Harga - - -
63 1 M1 PASANGAN BUBUNG ATAP GENTENG PALENTONG
Bubung Genteng Palentong bh 4.0000 - -
PC. (50 kg) zak 0.1304 - - -
Pasir Pasang m3 0.2100 - - -
Pekerja org 0.1500 - - -
Tukang Batu org 0.2000 - - -
Jumlah Harga - - -
64 1 M2 PASANGAN BUBUNG ATAP GENTENG BETON / KERAMIK
Bubung Genteng Beton / Keramik bh 3.0000 - -
PC. (50 kg) zak 0.1304 - - -
Pasir Pasang m3 0.2100 - - -
Pekerja org 0.1500 - - -
Tukang Batu org 0.2000 - - -

file/AHS/Ipeng/2007 8 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
Jumlah Harga - - -

file/AHS/Ipeng/2007 9 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
65 1 M1 PASANGAN LISTPLANK 3/30
Kayu Papan 3/30 m3 0.0100 - - -
Paku kg 0.0100 - - -
Pekerja org 0.0700 - - -
Tukang Kayu org 0.2000 - - -
Jumlah Harga - - -
66 1 M1 PASANGAN LISTPLANK 3/20
Kayu Papan 3/20 m3 0.0074 - - -
Paku kg 0.0100 - - -
Pekerja org 0.0700 - - -
Tukang Kayu org 0.2000 - - -
Jumlah Harga - - -
67 1 M1 PASANGAN TALANG SENG BJLS 30
Seng BJLS 30 (55 cm) m1 1.0500 - -
Paku Seng kg 0.1500 - - -
Kayu Papan m3 0.0130 - - -
Plin Coat kg 0.2500 - -
Pekerja org 0.3500 - - -
Tukang Kayu org 0.5600 - - -
Jumlah Harga - - -
68 1 M1 SALURAN GREVEL BETON 1/2 O 20 CM + PASANGAN
Galian Tanah m3 0.1500 - - -
Grevel 1/2 O 20 cm bh 1.0000 - -
Pas. Bata + Plesteran 1 : 3 m1 1.0000 - - -
Upah Kerja ls 1.0000 - - -
Jumlah Harga - - -
69 1 M1 SALURAN GREVEL BETON 1/2 O 30 CM + PASANGAN
Galian Tanah m3 0.2000 - - -
Grevel 1/2 O 30 cm bh 1.0000 - -
Pas. Bata + Plesteran 1 : 3 m1 1.0000 - - -
Upah Kerja ls 1.0000 - - -
Jumlah Harga - - -
70 1 M2 PASANGAN SIARAN BATU KALI
PC. (50 kg) zak 0.1050 - - -
Pasir Pasang m3 0.0100 - - -
Tukang Batu org 0.3600 - - -
Jumlah Harga - - -
71 1 M2 PASANGAN KACA POLOS 3 MM
Kaca Polos 3 mm Asahi m2 1.1000 - -
Pekerja org 0.1500 - - -
Tukang Kayu org 0.1500 - - -
Jumlah Harga - - -
72 1 M2 PASANGAN KACA POLOS 5 MM
Kaca Polos 5 mm Asahi m2 1.1000 - -
Pekerja org 0.1500 - - -
Tukang Kayu org 0.1500 - - -
Jumlah Harga - - -
73 1 M1 PEKERJAAN PAGAR TRALIS STANDARD
Bowplank m1 1.0000 - - -
Galian Tanah m3 0.4500 - - -
Urugan Pasir t = 10 cm m3 0.0800 - - -
Pasangan Aanstamping m3 0.1200 - - -
Pas. Batu Belah 1 pc : 4 psr m3 0.2000 - - -
Plesteran + Acian 1 pc : 4 psr m2 0.4100 - - -
Beton Tulang (100 kg/m3) m3 0.0563 - -
Pagar Tralis m1 1.5000 - -
Pengecatan m2 1.0000 - - -
Jumlah Harga - - -
74 1 M1 PEKERJAAN PAGAR BELAKANG / SAMPING
Galian Tanah m3 0.4500 - - -
Urugan Pasir t = 10 cm m3 0.0800 - - -
Pasangan Aanstamping m3 0.1200 - - -
Pas. Batu Belah 1 pc : 4 psr m3 0.2000 - - -
Pas. Bata + Plesteran 1 pc : 4 psr m2 1.8000 - - -
Beton Tulang (100 kg/m3) m3 0.0563 - - -
Besi Siku kg 1.0000 - -
Kawat Duri m1 3.0000 - -
Pengecatan m2 1.0000 - - -
Jumlah Harga - - -

file/AHS/Ipeng/2007 10 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
75 1 UNIT SEPTICTANK 2,5 X 1,5 X 2 M + REMBESANNYA (KANTOR TYPE BESAR)
Galian Tanah m3 7.5000 - - -
Pasir Urug m3 0.3570 - - -
Lantai Kerja m3 3.7500 - - -
Pas. Bata + Plesteran 1 pc : 2 psr m2 25.0000 - - -
Plat Beton Penutup & Balok m3 0.5000 - - -
Pipa PVC 4" jenis AW + Sambungan m1 9.0000 - -
Pipa GIP 1 1/2" m1 2.0000 - -
Galian Tanah untuk Rembesan m3 5.6250 - - -
Pasangan Injuk kg 9.0000 - -
Urugan Kerikil 3/5 cm m3 1.7500 - -
Pipa PVC 4" berlobang jenis AW m1 6.0000 - - -
Urugan Kembali Perataan Tanah m3 1.8750 - - -
Jumlah Harga - - -
76 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA (KANTOR TYPE KECIL)
Galian Tanah m3 4.5000 - - -
Pasir Urug m3 0.2142 - - -
Lantai Kerja m3 2.2500 - - -
Pas. Bata + Plesteran 1 pc : 2 psr m2 15.0000 - - -
Plat Beton Penutup & Balok m3 0.3000 - - -
Pipa PVC 4" jenis AW + Sambungan m1 5.4000 - - -
Pipa GIP 1 1/2" m1 1.2000 - - -
Galian Tanah untuk Rembesan m3 3.3750 - - -
Pasangan Injuk kg 5.4000 - - -
Urugan Kerikil 3/5 cm m3 1.0500 - - -
Pipa PVC 4" berlobang jenis AW m1 9.0000 - - -
Urugan Kembali Perataan Tanah m3 1.1250 - - -
Jumlah Harga - - -
77 1 UNIT SEPTICTANK 1,5 X 1 X 1,5 M + REMBESANNYA (RUMAH KAPASITAS KECIL)
Galian Tanah m3 2.2500 - - -
Pasir Urug m3 0.1071 - - -
Lantai Kerja m3 1.1250 - - -
Pas. Bata + Plesteran 1 pc : 2 psr m2 7.5000 - - -
Plat Beton Penutup & Balok m3 0.1500 - - -
Pipa PVC 4" jenis AW + Sambungan m1 9.0000 - - -
Pipa GIP 1 1/2" m1 0.6000 - - -
Galian Tanah untuk Rembesan m3 1.6875 - - -
Pasangan Injuk kg 2.7000 - - -
Urugan Kerikil 3/5 cm m3 0.5250 - - -
Pipa PVC 4" berlobang jenis AW m1 9.0000 - - -
Urugan Kembali Perataan Tanah m3 0.5625 - - -
Jumlah Harga - - -
78 1 BH PEKERJAAN PASANGAN KLOSET JONGKOK PROSELINT
Kloset Jongkok bh 1.0000 - -
PC. (50 kg) zak 0.1600 - - -
Pasir Pasang m3 0.0190 - - -
Pekerja org 1.0000 - - -
Tukang Batu org 0.1500 - - -
Jumlah Harga - - -
79 1 BH PEKERJAAN WASTAFEL
Wastafel bh 1.0000 - -
PC. (50 kg) zak 0.1200 - - -
Pasir Pasang m3 0.0100 - - -
Pekerja org 1.2000 - - -
Tukang Batu org 1.4500 - - -
Jumlah Harga - - -
80 1 M' PEKERJAAN MEMASANG PIPA PVC
Pipa PVC m1 1.1000 - -
Lem PVC bh 0.2500 - -
Pekerja org 0.0360 - - -
Tukang org 0.0600 - - -
Jumlah Harga - - -
81 1 BH PASANGAN KUNCI TANAM
Kunci 2 slaag bh 1.0000 - -
Tukang Kayu org 0.5000 - - -

file/AHS/Ipeng/2007 11 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
Jumlah Harga - - -

file/AHS/Ipeng/2007 12 dari 39
PNPM - PPK ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN


Harga Satuan Jumlah Harga Jumlah Harga
No. Uraian Sat. Koef. Bahan & Upah Upah Bahan Bahan & Upah
(Rp.) (Rp.) (Rp.) (Rp.)
82 1 BH ENGSEL PINTU
Engsel Pintu bh 1.0000 - -
Tukang Kayu org 0.1500 - - -
Jumlah Harga - - -
83 1 BH ENGSEL JENDELA
Engsel Jendela bh 1.0000 - -
Tukang Kayu org 0.1000 - - -
Jumlah Harga - - -
84 1 BH PASANGAN HAK ANGIN
Hak Angin bh 1.0000 - -
Tukang Kayu org 0.1000 - - -
Jumlah Harga - - -
85 1 BH PASANGAN GRENDEL SORONG/SLOT
Grendel Sorong/Slot bh 1.0000 - -
Tukang Kayu org 0.2000 - - -
Jumlah Harga - - -

file/AHS/Ipeng/2007 13 dari 39
Program Pengembangan Kecamatan Form AHS

ANALISA HARGA SATUAN


Propinsi : Jawa Barat
Kabupaten : Bekasi
Kecamatan :
Desa :

NO URAIAN KOEFISIEN SATUAN HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6
A001 1 M3 PEK. LAPISAN PONDASI BAWAH (LPB), KONSTRUKSI TELFORD
Batu Belah 1.3000 m3
Pasir Urug 1.3400 m3
Sirtu 1.3400 m3
Pekerja Pemecahan Batu 1.3333 org
Pekerja Pemasangan Batu 0.2500 org
Pekerja Penghamparan Pasir Urug 0.5000 org
Pekerja Penghamparan Sirtu 0.5000 org
Tukang 0.1000 org
JUMLAH PER M3 -
A002 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1 M'
Pekerja 0.4000 org
Tukang 0.0400 org
Alat Bantu 0.0500 lot
JUMLAH PER M3 -
A003 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 2 M'
Pekerja 0.5260 org - -
Tukang 0.0520 org - -
Alat Bantu 0.0500 lot - -
JUMLAH PER M3 -
A004 1 M3 PEK. GALIAN TANAH BERBATU/TANAH KERAS MAX. KEDALAMAN 1 M'
Pekerja 0.6250 org - -
Tukang 0.1250 org - -
Alat Bantu 0.2500 lot - -
JUMLAH PER M3 -
A005 1 M3 PEK. PEMADATAN TANAH SETIAP 20 CM
Pekerja 0.5000 org - -
Tukang 0.0500 org - -
Alat Bantu 0.1250 lot - -
JUMLAH PER M3 -
A006 1 M3 PEK. URUGAN TANAH KEMBALI
Pekerja 0.1920 org - -
Tukang 0.0190 org - -
Alat Bantu 0.1000 lot - -
JUMLAH PER M3 -
A007 1 M3 PEK. URUGAN PASIR URUG
Pekerja 0.1500 org - -
Tukang 0.0100 org - -
Pasir Urug 1.2000 m3 - -
JUMLAH PER M3 -
A008 1 M3 PEK. PASANGAN BATU BELAH 1 : 2
Pekerja 2.2500 org - -
Tukang 1.1250 org - -
Batu Belah 1.2000 m3 - -
Pasir Pasang 0.3800 m3 - -
Semen/PC (50 Kg) 3.5200 zak - -
JUMLAH PER M3 -
A009 1 M3 PEK. PASANGAN BATU BELAH 1 : 3
Pekerja 2.2500 org - -
Tukang 1.1250 org - -
Batu Belah 1.2000 m3 - -
Pasir Pasang 0.4000 m3 - -
Semen/PC (50 Kg) 2.8400 zak - -

file/form/Ipeng-2006
Program Pengembangan Kecamatan Form AHS

JUMLAH PER M3 -

file/form/Ipeng-2006
Program Pengembangan Kecamatan Form AHS

1 2 3 4 5 6
A010 1 M3 PEK. PASANGAN BATU BELAH 1 : 4
Pekerja 2.2500 org - -
Tukang 1.1250 org - -
Batu Belah 1.2000 m3 - -
Pasir Pasang 0.4200 m3 - -
Semen/PC (50 Kg) 2.5000 zak - -
JUMLAH PER M3 -
A011 1 M3 PEK. PASANGAN BATU BELAH 1 : 5
Pekerja 2.2500 org - -
Tukang 1.1250 org - -
Batu Belah 1.2000 m3 - -
Pasir Pasang 0.4400 m3 - -
Semen/PC (50 Kg) 2.1600 zak - -
JUMLAH PER M3 -
A011 1 M3 PEK. PASANGAN BATU BELAH 1 : 6
Pekerja 2.2500 org - -
Tukang 1.1250 org - -
Batu Belah 1.2000 m3 - -
Pasir Pasang 0.4800 m3 - -
Semen/PC (50 Kg) 1.8800 zak - -
JUMLAH PER M3 -
A012 1 M3 PEK. BRONJONG/GABION
Pekerja 2.7800 org - -
Tukang 1.0400 org - -
Batu Belah 1.2000 m3 - -
Kawat Bronjong 19.8500 kg - -
JUMLAH PER M3 -
A013 1 M3 PEK. BETON K-175 (1 Pc : 2 Ps : 3 Kr)
Pekerja 1.5000 org - -
Tukang 0.5000 org - -
Tenaga Ahli 0.0600 org - -
Kerikil 0.8300 m3 - -
Pasir Beton 0.5400 m3 - -
Semen/PC (50 Kg) 6.8000 zak - -
Alat Bantu 0.0700 lot - -
JUMLAH PER M3 -
A014 1 M3 PEK. BETON K-225
Pekerja 1.5000 org - -
Tukang 0.5000 org - -
Tenaga Ahli 0.0600 org - -
Kerikil 0.8100 m3 - -
Pasir Beton 0.4900 m3 - -
Semen/PC (50 Kg) 7.8960 zak - -
Alat Bantu 0.0700 lot - -
JUMLAH PER M3 -
A015 1 KG PEK. BESI BETON TERPASANG U - 24
Tukang 0.0250 org - -
Tenaga Ahli 0.0100 org - -
Besi Beton 1.1000 kg - -
Kawat Beton 0.0200 kg - -
Alat Bantu 0.0200 lot - -
JUMLAH PER KG -
A016 1 M2 PEK. BEKISTING UNTUK BETON DENGAN PAPAN
Pekerja 0.1200 org - -
Tukang 0.1500 org - -
Tenaga Ahli 0.0500 org - -
Kayu Bekisting 0.0410 m3 - -
Paku 0.4000 kg - -
JUMLAH PER M2 -

file/form/Ipeng-2006
Program Pengembangan Kecamatan Form AHS

1 2 3 4 5 6
A017 1 M2 PASANGAN STOOT WERK
Pekerja 0.1500 org - -
Tukang 0.2000 org - -
Tenaga Ahli 0.2170 org - -
Kayu Stoot 9.0000 bt - -
Papan Terentang 0.0160 m3 - -
Paku 0.5000 kg - -
JUMLAH PER M2 -
A018 1 M2 PEK. PLESTERAN 1 : 5 + ACIAN
Pekerja 0.2860 org - -
Tukang 0.2140 org - -
Pasir Pasang 0.0190 m3 - -
Semen/PC 0.1000 zak - -
JUMLAH PER M2 -
A019 1 M2 PEK. PLESTERAN 1 : 4 + ACIAN
Pekerja 0.2860 org - -
Tukang 0.2140 org - -
Pasir Pasang 0.0190 m3 - -
Semen/PC 0.1404 zak - -
JUMLAH PER M2 -
A020 1 M2 PEK. PLESTERAN 1 : 3 + ACIAN
Pekerja 0.2860 org - -
Tukang 0.2140 org - -
Pasir Pasang 0.0190 m3 - -
Semen/PC 0.1600 zak - -
JUMLAH PER M2 -
A021 1 M2 ACIAN
Pekerja 0.1430 org - -
Tukang 0.1070 org - -
Semen/PC 0.0800 zak - -
JUMLAH PER M2 -
A022 1 Ltr. LAPIS RESAP PENGIKAT
Pekerja 0.0602 org - -
Tenaga Ahli 0.0120 org - -
Aspal 0.6420 kg -
Minyak Tanah 0.4890 ltr -
Kayu Bakar 0.0150 m3 -
Alat Bantu 0.0004 set - -
JUMLAH PER Ltr. -
A023 1 Ltr. LAPIS PEREKAT
Pekerja 0.0602 org - -
Tenaga Ahli 0.0120 org - -
Aspal 0.8880 kg - -
Minyak Tanah 0.2540 ltr - -
Kayu Bakar 0.0150 m3 - -
Alat Bantu 0.0003 set - -
JUMLAH PER Ltr. -
A024 1 M2 LAPIS PENETRASI
Pekerja 0.1414 org - -
Tukang 0.0043 org - -
Tenaga Ahli 0.0043 org - -
Batu Pecah Mesin 3 - 5 cm 0.0404 m3 -
Batu Pecah Mesin 2 - 3 cm 0.0222 m3 -
Batu Pecah Mesin 1 - 2 cm 0.0111 m3 -
Pasir Aspal/Abu Batu 0.0025 m3 -
Aspal 4.0000 kg - -
Minyak Tanah 0.3214 ltr - -
Kayu Bakar 0.0150 m3 - -
Alat Bantu 0.0058 set - -
JUMLAH PER M2 -

file/form/Ipeng-2006
PNPM MANDIRI PERDESAAN Form IV.6

DAFTAR HARGA SATUAN BAHAN/ALAT


Propinsi : Jawa Barat
Kabupaten : Bekasi
Kecamatan : SerangBaru
Desa : Nagasari

Nama Suplier

No. Jenis Bahan/Material Satuan Jaya Harga untuk RAB


Agung Jaya Milik Jaya
Waringin

1 Batu Belah m3 185,000 165,000 175,000 165,000


2 Pasir Urug m3 140,000 135,000 90,000 90,000
3 Split 2/3 m3 185,000 200,000 175,000 175,000
4 Pasir Pasang m3 180,000 160,000 150,000 150,000
5 Sirtu m3 150,000 155,000 160,000 150,000
6 Semen/PC @ 50 Kg (Tiga Roda) zak 53,000 53,500 53,000 53,000
7 Besi 10 mm Btg 37,500 37,000 40,000 37,000
8 Buis Beton dia. 40 cm buah 70,000 75,000 70,000 70,000
9 Tanah Urug m3 70,000 75,000 80,000 70,000
10 Papan Bekisting Lembar 12,000 10,000 11,500 10,000
11 Paku Kg 15,000 15,500 15,000 15,000
12 Bambu buah 6,000 6,500 6,000 6,000
13 Cangkul buah 40,000 40,000 45,000 40,000
14 Sekop buah 35,000 40,000 45,000 35,000
15 Martil 5 Kg buah 40,000 40,000 45,000 40,000
16 Garpu buah 40,000 42,000 38,000 38,000
15 Ember buah 35,000 32,500 32,000 32,000
16 Selang waterpas m1 10,000 12,000 10,500 10,000
17 Sendok Tembok buah 15,000 18,000 15,000 15,000
18 Benang Klos buah 3,000 3,500 4,500 3,000
19 Belincong buah 52,000 52,500 50,000 50,000

DAFTAR HARGA SATUAN UPAH


Besar Upah
No. Tenaga Kerja Upah
Satuan Upah ( Rp./6Jam) Satuan
( Rp./Hari/8jam )
1 Pekerja 50000 orang 37500 HOK
2 Tukang 60000 orang 45000 HOK

DAFTAR HARGA SATUAN MESIN GILAS

No. Jenis Kegiatan Harga Satuan

1 Sewa Alat 400,000 Hari


2 Mobilisasi/Demobilisasi 1,500,000 ls

Mengetahui : Dibuat oleh :


Ketua TPK Sekretaris TPK

cum Wijaya ………………………….

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN Form IV.6

Nama dan Alamat Suplier

No. Jenis Bahan/Material Satuan Jaya Harga untuk RAB


Agung Jaya Milik Jaya
Waringin

1 Batu Belah m3 185,000 162,500 175,000 165,000


2 Pasir Urug m3 80,000 80,000 85,000 140,000
3 Tanah Urug m3
4 Pasir Pasang m3 160,000 157,000 140,000 140,000
5 Semen PC 50 Kg zak 53,000 52,000 51,000 54,000
6 Bambu Batang 5,000 4,500 5,000 4,500
Pasir beton m3 175,000
7 Papan bekisting
Batu Kapur m3 140,000
8 Paku 175,000
9 Cangkul buah 20,000 20,000 25,000 20,000
10 Sekop buah 20,000 25,000 32,000 20,000
11 Martil 5 Kg buah 40,000 40,000 45,000 40,000
12 Kunci Besi buah 8,000 7,000 7,000 7,000
13 Garpu buah 35,000 32,500 32,000 32,000
14 Belincong Bh 47,500 45,000 47,500 45,000

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN Form IV.6

133333.3

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN Form IV.8

Propinsi : Jawa Barat Jenis Prasarana : Perkerasan Rabat Beton


Kabupaten : Majalengka
Kecamatan : Jatitujuh
DANA DESA Lokasi : Blok Winong
Desa : Pangkalanpari Volume : 200 m1

CL
Rabat beton adukan 1:3:5 ; (t) = 0.15 m

Pasir Urug (t) = 0.02 m

4% 4%
Lebar Beton (L) = 2.00 m

KONSTRUKSI RABAT

Perhitungan Volume Beton Kebutuhan Bahan & Upah Pekerjaan Bekisting (3X Pakai)
= 0.15 x 2.00 x 200 = 60.00 M3 Dimensi Bekisting (P) = 200.00 m
(T) = 0.15 m
Perhitungan Volume Lapisan Bawah Rabat (Pasir Urug)
= 0.02 x 2.00 x 200 = 8.00 M3 Vol 1
= (T) x P x 2
= 0.150 x 200.00 2
= 60.00 m2

Vol 2 ( Untuk Dilatasi per 2 m )


Kebutuhan Bahan & Upah Pekerjaan Perkerasan Beton = (( 200 / 2 ) + 1 ) x 0.15
(1 Pc : 3 Ps : 5 Kr) = 15.150 m2
= Volume x Analisa
Vol 1 + 2
1. Kebutuhan Split 2/3 = 75.150 / 3 = 25.05 m2
= 60.00 x 0.93 = 55.80 M3

2. Kebutuhan Pasir Beton 1. Kebutuhan Bekisting = 25.05 x 0.011


= 60.00 x 0.55 = 33.00 M3 = 0.2839 M3 = 17.744 lbr
2. Kebutuhan Paku = 25.05 x 0.4
3. Kebutuhan Semen/PC (50Kg) = 10.02 Kg
= 60.00 x 3.956 = 237.36 Zak 3. Kebutuhan Pekerja = 25.05 x 0.12
= 3.01 HOK
4. Kebutuhan Pekerja 4. Kebutuhan Tukang = 25.05 x 0.15
= 60.00 x 2.0 = 120.00 HOK = 3.76 HOK

5. Kebutuhan Tukang REKAP KEBUTUHAN BAHAN & UPAH


= 60.00 x 0.5 = 30.00 HOK Split 2/3 = 55.8 Dibulatkan 56 M3
Pasir Beton = 33.0 Dibulatkan 33 M3
PC (50Kg) = 237.4 Dibulatkan 237 Zak
Kebutuhan Bahan & Upah Pekerjaan Urugan Pasir Pasir Urug = 9.6 Dibulatkan 10 M3
( Lapisan Bawah Rabat ) Bekisting = 17.7 Dibulatkan 18 Lembar
a. Penghamparan Paku = 10.0 Dibulatkan 10 Kg
1. Kebutuhan Pasir Urug Pekerja = 128.2 Dibulatkan 128 HOK
= 8.00 x 1.2 = 9.60 M3 Tukang = 34.2 Dibulatkan 34 HOK
plastik = 400.0 Dibulatkan 400 m2
2. Kebutuhan Pekerja
= 8.00 x 0.15 = 1.20 HOK
b. Pemadatan
1. Kebutuhan Pekerja
= 8.00 x 0.5 = 4.00 HOK

2. Kebutuhan Tukang
= 8.00 x 0.05 = 0.40 HOK

Tanggal Survey : Dibuat Oleh : Ratim

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN Form IV.8

Propinsi : Jawa Barat Jenis Prasarana : Perkerasan Telford


Kabupaten : Bekasi
Kecamatan : Jatitujuh
Take OF Sheet Lokasi : Kp. Nambo RT 10
Desa : Nagasari Volume : 355 m1

Batu Tepi 15/20

Batu Pengunci 5/7

Batu Pokok 10/15

Sirtu

4-5% 4-5%
0.05 m
0.2 m
0.05 m
Tanah Dasar
3.00

Pasir Urug

KONSTRUKSI TELFORD
1. Pengadaan Pasir Urug
= 0.05 x 2.00 x 355 3. Pemecahan Batu
= 35.50 m3 = 0.20 x 2.00 x 0 355 ###
=### 142.00 m3
2. Pengadaan Batu
= 0.20 x 2.00 x 355 4. Pemasangan Batu
= 142.00 m3 = 2.00 x 355
=### 710 m2
3. Pengadaan Sirtu
= 0.05 x 2.00 x 355 Kebutuhan HOK :
= 35.50 m3 = Volume / Faktor Koefisien

Total Volume Pasir Urug 1 Penghamparan Pasir Urug


= 35.50 m3 = 35.50 / 2.00 = 17.75 HOK
2 Penghamparan Sirtu
Total Volume Batu = 35.50 / 2.00 = 17.75 HOK
= 142.00 m3 3 Pemecahan Batu (Analisa Batu yg dipecah 30%)
= 55.38 / 0.75 = 73.84 HOK
Total Volume Sirtu 4 Pemasangan Batu
= 35.50 m3 = 710 / 4.00 = 177.50 HOK

Sub Total Kebutuhan HOK :


Kebutuhan Bahan/Material untuk Perkerasan Jalan adalah Pekerja = 286.84 HOK
sebagai berikut :

1 Pasir Urug Kebutuhan Pemadatan Permukaan


= 35.50 x 1.3400 = 47.57 m3 Kebutuhan Mesin Gilas
2 Batu Belah = 2.00 x 355 = 710 M2
= 142.00 x 1.3000 = 184.60 m3 = 710 / 300 = 2.37 Hari
3 Sirtu
= 35.50 x 1.3400 = 47.57 m3
REKAP KEBUTUHAN BAHAN & UPAH
Pasir Urug = 47.57 Dibulatkan 241 m3
Batu Belah = 184.60 Dibulatkan 936 m3
Total Kebutuhan HOK : Sirtu = 47.57 Dibulatkan 241 m3
1. Penghamparan Pasir Urug Pekerja = 286.84 Dibulatkan 1,454 HOK
= 0.05 x 2.00 x 355 Kebutuhan Mesin Gilas = 2.37 Dibulatkan 12 Hari
= 35.50 m3

2. Penghamparan Sirtu
= 0.05 x 2.00 x 355
= 35.50 m3

Tanggal Survey : Dibuat Oleh : Ratim

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN Form IV.8

HOK
Hari

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN

Propinsi Jawa Barat Jenis Prasarana : Tembok Penahan Tanah


Kabupaten Majalengka Lokasi Dusun : Baleker Pengaritan
Kecamatan Jatitujuh Take Of Sheet Volume : 0.80 x 0.325 x
Desa Pangkalanpari Kiri - Kanan

PERHITUNGAN VOLUME GALIAN , PASANGAN BATU KALI DAN PLESTERAN

Panjang 260.0 M Kiri - Kanan


Plesteran tebal 1,5 cm
0.25 0.25 Perhitungan Volume Galian
0.20 X 0.40 X 260.0 X 2.00 = 41.60
V.1 V.1
Perhitungan Volume Pasangan Batu Kali
0.60
Adukan camp V.1 : ( 0.25 + 0.40 )X 0.60 X 260.0 X 2.00 = 101.40
1:5
2
V.2 : 0.20 X 0.40 X 260.0 X 2.00 = 41.60
Vol 1 + 2 : = 101.40 + 41.60 = 143.00
V.2 V.2
0.20
Perhitungan Volume Plesteran
0.05 ( 0.35 X 260.0 ) X 2.00 = 182.00
0.40 0.40 Perhitungan Volume Pasir urug
0.05 X 0.40 X 260.0 X 2.00 = 10.40
PERHITUNGAN ANALISA KEBUTUHAN BAHAN DAN UPAH
PEKERJAAN GALIAN
I. UPAH
1. Pekerja = 0.400 X 1.00 X 41.60 = 16.64 HOK

PASANGAN BATU KALI CAMPURAN ( 1 : 5 )


I. BAHAN
1. Batu Belah = 1.250 X 143.00 = 178.75 M3
2.Pasir pasang = 0.550 X 143.00 = 78.65 M3
3.Semen Pc 50 kg = 2.500 X 143.00 = 357.50 Zak

II. UPAH
1. Pekerja = 2.250 X 1.00 X 143.00 = 321.75 HOK
2. Tukang = 1.125 X 1.00 X 143.00 = 160.88 HOK

PLESTERAN TEBAL 1.5 CM ( 1 :4 ) + Acian


I. BAHAN
1. Pasir Pasang = 0.0190 X 182.0 = 3.46 M3
2. Semen Pc 50 kg = 0.1404 X 182.0 = 25.55 Zak

II. UPAH
1. Pekerja = 0.286 X 1.00 X 182.0 = 52.05 HOK
2.Tukang = 0.214 X 1.00 X 182.0 = 38.95 HOK

TOTAL KEBUTUHAN BAHAN DAN UPAH

I. BAHAN
1. Batu Belah = 178.75 M3 dibulatkan 179.00 M3
2.Pasir pasang = 78.65 + 3.46 = 82.11 M3 dibulatkan 83.00 M3
3.Semen Pc 50 kg = 357.50 + 25.55 = 383.05 Zak dibulatkan 384.00 Zak
4. Pasir Urug = 10.40 10.40 M3 dibulatkan 11.00 M3
5. Bambu = 100 Btg

II. UPAH
1. Pekerja = 16.64 + 321.75 + 52.05 = 390.44 HOK dibulatkan 391.00 HOK
2.Tukang = 160.88 + 38.95 = 199.82 HOK dibulatkan 200.00 HOK

Tanggal Survey : Dibuat Oleh :

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN

Jenis Prasarana : Tembok Penahan Tanah


Lokasi Dusun : Baleker Pengaritan
260 m

GALIAN , PASANGAN BATU KALI DAN PLESTERAN

41.60 m3

101.40 m3

41.60 m3
143.00 m3

182.00 m2

10.40 m3
GAN ANALISA KEBUTUHAN BAHAN DAN UPAH

HOK
HOK

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


RINCIAN ANGGARAN BIAYA (RAB)
DESA PANGKALANPARI KECAMATAN JATITUJUH
TAHUN ANGGARAN 2016

A. INFRASTRUKTUR DESA No. RAB : 01.


Kegiatan : RABAT BETON BLOK WINONG Program : DD
Jenis Kegiatan : Perkerasan Rabat Beton
Desa : Pangkalanpari Ukuran/Dimensi : 200 m1

Volume Harga Jumlah Dari Jumlah Dari


Jumlah Total
URAIAN Satuan Satuan Swadaya BANPROV
Dari Dari DANA
Total
Swadaya DESA (Rp.) (Rp.) (Rp.) (Rp.)
BAHAN
1 Split 2/3 56 - 56 M3 175,000 - 9,800,000 9,800,000
2 Pasir Beton 33 - 33 M3 150,000 - 4,950,000 4,950,000
3 PC (50Kg) 237 - 237 Zak 72,000 - 17,064,000 17,064,000
4 Pasir Urug 10 - 10 M3 90,000 - 900,000 900,000
5 Bekisting 18 - 18 Lembar 25,000 - 450,000 450,000
6 Paku 10 - 10 Kg 15,000 - 150,000 150,000
7 plastik 400 - 400 m2 2,000 - 800,000 800,000
Sub Total 1) - 34,114,000 34,114,000 54,996,500
ALAT
1 Cangkul 5 - 5 bh 40,000 200,000 200,000
2 Sekop 5 - 5 bh 60,000 300,000 300,000
3 Sewa Molen 50 - 50 hok 100,000 - 5,000,000 5,000,000
4 Sewa gerobak 50 50 hok 20,000 1,000,000 1,000,000
5 Sewa bak tempat air 25 25 bh 10,000 250,000 250,000
6 pengki 5 - 5 bh 30,000 150,000 150,000
7 Papan Nama Kegiatan 1 - 1 bh 150,000 - 150,000 150,000
8 Benang 5 5 bh 2,500 12,500 12,500
9 Ember 10 10 bh 15,000 150,000 150,000
Sub Total 2) - 7,212,500 7,212,500
UPAH
1 Pekerja 128 - 128 HOK 65,000 - 8,320,000 8,320,000
2 Tukang 34 - 34 HOK 90,000 - 3,060,000 3,060,000
3 ATK 1 PAKET 500,000 500,000 500,000
4 Past poto 4 lembar 8 lembar 25,000 200,000 200,000

Desa Pangkalanpari Kec. Jatitujuh Kabupaten Majalengka


5 Pelaporan 1 PAKET 500,000 500,000 500,000
6 Honorarium panitia - -
Penanggung jawab 1 PAKET 300,000 300,000 300,000
Ketua 1 PAKET 250,000 250,000 250,000
Sekretaris 1 PAKET 200,000 200,000 200,000
Anggota 1 PAKET 170,000 170,000 170,000
Anggota 1 PAKET 170,000 170,000 170,000
Sub Total 3) - 13,670,000 13,670,000

TOTAL BIAYA - 54,996,500 54,996,500

Dari DANA DESA : 54,996,500


Sumber Dana
Dari Swadaya : -

Catatan :
1. Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom swadaya.
2. Nilai RAB didapat dari kolom Volume dari Dana dikalikan dengan kolom Harga satuan yang kemudian ditotalkan.
3. Sumbangan dalam bentuk uang dimasukkan pada baris terbawah (sumber dana dari swadaya).
4. Swadaya dalam bentuk lahan ditulis dalam format lain.

Desa Pangkalanpari Kec. Jatitujuh Kabupaten Majalengka


0

A. INFRASTR : 0 No. RAB : 02


Kegiatan : : RABAT BETON BLOK WINONG Program : DD
0 : 0 Jenis Kegiatan : Gorong-Gorong Buis Beton
Desa : Pangkalanpari Ukuran/Dimensi : Ø 40 Panjang 4 M ( 1 Unit )

Volume Harga Jumlah Dari Jumlah Dari


Jumlah Total
URAIAN Satuan Satuan Swadaya Dana
Dari
Total Dari Dana
Swadaya (Rp.) (Rp.) (Rp.) (Rp.)
BAHAN
1 Batu Belah 5 - 5 m3 165,000 - 825,000 825,000
2 Pasir Pasang 2 - 2 m3 150,000 - 300,000 300,000
3 Semen PC 50 KG 13 - 13 zak 72,000 - 936,000 936,000
4 Buis Beton Ø 40 5 - 5 m3 70,000 - 350,000 350,000

Sub Total 1) - 2,411,000 2,411,000

ALAT
1 Cangkul 3 3 - bh 40,000 120,000 - 120,000
2 Sekop 2 2 - bh 60,000 120,000 - 120,000
3 Palu 5 Kg 2 2 - btg 100,000 200,000 - 200,000
4 Belincong 2 2 - bh 30,000 60,000 - 60,000
5 Garpu 2 2 - bh 38,000 76,000 - 76,000
6 Ember Aduk 5 5 - bh 32,000 160,000 - 160,000
7 Selang Waterpas 10 10 - m1 10,000 100,000 - 100,000
8 Benang Klos 2 2 - bh 3,000 6,000 - 6,000
9 Sendok Tembok 5 5 - bh 15,000 75,000 - 75,000

Sub Total 2) 917,000 - 917,000

UPAH
1 pekerja 21 - 21 HOK 65,000 - 1,365,000 1,365,000
2 Tukang 7 - 7 HOK 90,000 - 630,000 630,000

Sub Total 3) - 1,995,000 1,995,000

TOTAL BIAYA 917,000 4,406,000 5,323,000

Desa Pangkalanpari Kec. Jatitujuh Kabupaten Majalengka


Dari PNPM : 4,406,000
Sumber Dana
Dari Swadaya : 917,000

Catatan :
1. Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom swadaya.
2. Nilai RAB didapat dari kolom Volume dari Dana dikalikan dengan kolom Harga satuan yang kemudian ditotalkan.
3. Sumbangan dalam bentuk uang dimasukkan pada baris terbawah (sumber dana dari swadaya).
4. Swadaya dalam bentuk lahan ditulis dalam format lain.

0 0 Diperiksa oleh :
### 0 0 0

0 0 0 0
0

Desa Pangkalanpari Kec. Jatitujuh Kabupaten Majalengka


0

A. INFRASTR : 0 No. RAB : 03


Kegiatan : : RABAT BETON BLOK WINONG Program : DD
0 : 0 Jenis Kegiatan : Gorong-gorong Plat beton
Desa : Pangkalanpari Ukuran/Dimensi : 1.00 x 1.00 x 5.00 M

Volume Harga Jumlah Dari Jumlah Dari


Jumlah Total
URAIAN Dari Satuan Satuan Swadaya Dana
Total Dari Dana
Swadaya (Rp.) (Rp.) (Rp.) (Rp.)
BAHAN
1 Batu Belah 10 - 10 m3 165,000 - 1,650,000 1,650,000
2 Pasir Pasang 7 - 7 m3 150,000 - 1,050,000 1,050,000
3 Semen PC 50 KG/Zak 30 - 30 zak 72,000 - 2,160,000 2,160,000
4 Split 2/3 1 - 1 m3 175,000 175,000 175,000
5 Besi 10 mm 23 - 23 btg 37,000 - 851,000 851,000
Sub Total 1) - 5,886,000 5,886,000
ALAT
1 Cangkul 3 3 - bh 40,000 120,000 - 120,000
2 Sekop 2 2 - bh 60,000 120,000 - 120,000
3 Palu 5 Kg 2 2 - btg 100,000 200,000 - 200,000
4 Belincong 2 2 - bh 30,000 60,000 - 60,000
5 Garpu 2 2 - bh 38,000 76,000 - 76,000
6 Ember Aduk 5 5 - bh 32,000 160,000 - 160,000
7 Selang Waterpas 10 10 - m1 10,000 100,000 - 100,000
8 Benang Klos 2 2 - bh 3,000 6,000 - 6,000
9 Sendok Tembok 5 5 - bh 15,000 75,000 - 75,000

Sub Total 2) 917,000 - 917,000


UPAH
1 pekerja 67 - 67 HOK 65,000 - 4,355,000 4,355,000
2 Tukang 32 - 32 HOK 90,000 - 2,880,000 2,880,000

Sub Total 3) - 7,235,000 7,235,000


TOTAL BIAYA 917,000 13,121,000 14,038,000

Dari PNPM : 13,121,000


Sumber Dana
Dari Swadaya : 917,000

Catatan :
1. Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom swadaya.
2. Nilai RAB didapat dari kolom Volume dari Dana dikalikan dengan kolom Harga satuan yang kemudian ditotalkan.

Desa Pangkalanpari Kec. Jatitujuh Kabupaten Majalengka


3. Sumbangan dalam bentuk uang dimasukkan pada baris terbawah (sumber dana dari swadaya).
4. Swadaya dalam bentuk lahan ditulis dalam format lain.

0 0 Dibuat oleh :
### 0 0 0

0 0 0 0
0

Desa Pangkalanpari Kec. Jatitujuh Kabupaten Majalengka


PNPM MANDIRI PERDESAAN Form IV.8

RENCANA ANGGARAN BIAYA

Propinsi : Jawa Barat No. RAB : 02.


Kabupaten : Bekasi Program : DD
Kecamatan : SerangBaru Jenis Kegiatan : Perkerasan Telford
Desa : Nagasari Ukuran/Dimensi : 355 m1

Volume Harga Jumlah Dari Jumlah Dari


Jumlah Total
URAIAN Satuan Satuan Swadaya PNPM
Dari Dari
Total
Swadaya PNPM (Rp.) (Rp.) (Rp.) (Rp.)
BAHAN
1 Batu Belah 936 - 936 m3 165,000 - 154,440,000 154,440,000
2 Pasir Urug 241 - 241 m3 90,000 - 21,690,000 21,690,000
3 Sirtu 241 - 241 m3 150,000 - 36,150,000 36,150,000

Sub Total 1) - 212,280,000 212,280,000


ALAT
1 Cangkul 5 5 - bh 40,000 200,000 - 200,000
2 Sekop 3 3 - bh 60,000 180,000 - 180,000
3 Palu 5 Kg 3 3 - btg 100,000 300,000 - 300,000
4 Belincong 2 2 - bh 30,000 60,000 - 60,000
5 Sewa Mesin Gilas 12 - 12 hari 400,000 - 4,800,000 4,800,000
6 Mobilisasi Mesin Gilas 1 - 1 ls 1,500,000 - 1,500,000 1,500,000

Sub Total 2) 6,300,000 7,040,000


UPAH
1 Pekerja 1,454 - 1,454 HOK 37,500 - 54,525,000 54,525,000

Sub Total 3) - 54,525,000 54,525,000

TOTAL BIAYA 273,105,000 273,845,000

Dari PNPM : 273,105,000


Sumber Dana
Dari Swadaya :

Catatan :
1. Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom swadaya.
2. Nilai RAB didapat dari kolom Volume dari Dana dikalikan dengan kolom Harga satuan yang kemudian ditotalkan.
3. Sumbangan dalam bentuk uang dimasukkan pada baris terbawah (sumber dana dari swadaya).
4. Swadaya dalam bentuk lahan ditulis dalam format lain.

Disetujui oleh : Diperiksa oleh : Dibuat oleh :


PjOK Fasilitator Teknik Ketua TPK Kader teknik

0 0 0 0
0

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN Form IV.8

RENCANA ANGGARAN BIAYA

Propinsi : Jawa Barat No. RAB : 03.


Kabupaten : Bekasi Program : DD
Kecamatan : SerangBaru Jenis Kegiatan : Gorong-Gorong Buis Beton
Desa : Nagasari Ukuran/Dimensi : Ø 40 Panjang 4 M ( 2 Unit )
2
Volume Harga Jumlah Dari Jumlah Dari
Jumlah Total
URAIAN Satuan Satuan Swadaya PNPM
Dari Dari
Total
Swadaya PNPM (Rp.) (Rp.) (Rp.) (Rp.)
BAHAN
1 Batu Belah 10 - 10 m3 165,000 - 1,650,000 1,650,000
2 Pasir Pasang 4 - 4 m3 150,000 - 600,000 600,000
3 Semen PC 50 KG 26 - 26 zak 53,000 - 1,378,000 1,378,000
4 Buis Beton Ø 40 10 - 10 m3 70,000 - 700,000 700,000

Sub Total 1) - 4,328,000 4,328,000

ALAT
1 Cangkul 6 6 - bh 40,000 240,000 - 240,000
2 Sekop 4 4 - bh 60,000 240,000 - 240,000
3 Palu 5 Kg 4 4 - btg 100,000 400,000 - 400,000
4 Belincong 4 4 - bh 30,000 120,000 - 120,000
5 Garpu 4 4 - bh 38,000 152,000 - 152,000
6 Ember 10 5 5 bh 32,000 160,000 160,000 320,000
7 Selang Waterpas 20 10 10 m1 10,000 100,000 100,000 200,000
8 Benang Klos 4 2 2 bh 3,000 6,000 6,000 12,000
9 Sendok Tembok 10 10 - bh 15,000 150,000 - 150,000

Sub Total 2) 1,568,000 266,000 1,834,000

UPAH
1 pekerja 42 - 42 HOK 37,500 - 1,575,000 1,575,000
2 Tukang 14 - 14 HOK 45,000 - 630,000 630,000

Sub Total 3) - 2,205,000 2,205,000

TOTAL BIAYA 1,568,000 6,799,000 8,367,000

Dari PNPM : 6,799,000


Sumber Dana
Dari Swadaya : 1,568,000

Catatan :
1. Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom swadaya.
2. Nilai RAB didapat dari kolom Volume dari Dana dikalikan dengan kolom Harga satuan yang kemudian ditotalkan.
3. Sumbangan dalam bentuk uang dimasukkan pada baris terbawah (sumber dana dari swadaya).
4. Swadaya dalam bentuk lahan ditulis dalam format lain.

Disetujui oleh : Diperiksa oleh : Dibuat oleh :


PjOK Fasilitator Teknik Ketua TPK Kader teknik

0 0 0 0
0

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN Form IV.8

RENCANA ANGGARAN BIAYA

Propinsi : Jawa Barat No. RAB : 03


Kabupaten : Bekasi Program : DD
Kecamatan : SerangBaru Jenis Kegiatan : Gorong-gorong Plat beton
Desa : Nagasari Ukuran/Dimensi : 1.00 x 1.00 x 5.00 M

Volume Harga Jumlah Dari Jumlah Dari


Jumlah Total
URAIAN Dari Dari Satuan Satuan Swadaya Dana
Total
Swadaya Dana (Rp.) (Rp.) (Rp.) (Rp.)
BAHAN
1 Batu Belah 10 - 10 m3 165,000 - 1,650,000 1,650,000
2 Pasir Pasang 7 - 7 m3 150,000 - 1,050,000 1,050,000
3 Semen PC 50 KG 30 - 30 zak 53,000 - 1,590,000 1,590,000
4 Split 2/3 1 - 1 m3 175,000 175,000 175,000
5 Besi 10 mm 23 - 23 btg 37,000 - 851,000 851,000
Sub Total 1) - 5,316,000 5,316,000
ALAT
1 Cangkul 3 3 - bh 40,000 120,000 - 120,000
2 Sekop 2 2 - bh 60,000 120,000 - 120,000
3 Palu 5 Kg 2 2 - btg 100,000 200,000 - 200,000
4 Belincong 2 2 - bh 30,000 60,000 - 60,000
5 Garpu 2 2 - bh 38,000 76,000 - 76,000
6 Ember Aduk 5 5 - bh 32,000 160,000 - 160,000
7 Selang Waterpas 10 10 - m1 10,000 100,000 - 100,000
8 Benang Klos 2 2 - bh 3,000 6,000 - 6,000
9 Sendok Tembok 5 5 - bh 15,000 75,000 - 75,000

Sub Total 2) 917,000 - 917,000


UPAH
1 pekerja 67 - 67 HOK 37,500 - 2,512,500 2,512,500
2 Tukang 32 - 32 HOK 45,000 - 1,440,000 1,440,000

Sub Total 3) - 3,952,500 3,952,500


TOTAL BIAYA 917,000 9,268,500 10,185,500

Dari PNPM : 9,268,500


Sumber Dana
Dari Swadaya : 917,000

Catatan :
1. Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom swadaya.
2. Nilai RAB didapat dari kolom Volume dari Dana dikalikan dengan kolom Harga satuan yang kemudian ditotalkan.
3. Sumbangan dalam bentuk uang dimasukkan pada baris terbawah (sumber dana dari swadaya).
4. Swadaya dalam bentuk lahan ditulis dalam format lain.

Disetujui oleh : Diperiksa oleh : Dibuat oleh :


PjOK Fasilitator Teknik Ketua TPK Kader teknik

### 0 0 0
0

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN Form IV.8

RENCANA ANGGARAN BIAYA

Propinsi : Jawa Barat No. RAB : 04.


Kabupaten : Majalengka Program : Ban-prov
Kecamatan : Ligung Jenis Kegiatan : SPAL
Desa : Buntu Ukuran/Dimensi : 260 m1

Volume Harga Jumlah Dari Jumlah Dari


Jumlah Total
URAIAN Satuan Satuan Swadaya banprov
Dari Dari
Total
Swadaya banprov (Rp.) (Rp.) (Rp.) (Rp.)
BAHAN
1 Batu Belah 179 - 179 m3 185,000 - 33,115,000 33,115,000
2 Pasir Pasang 83 - 83 m3 200,000 - 16,600,000 16,600,000
3 Pasir Urug 11 - 11 m3 100,000 - 1,100,000 1,100,000
4 Semen PC 50 Kg 302 - 302 Zak 72,000 - 21,744,000 21,744,000
5 Bambu 100.00 100 Btg 20,000 - 2,000,000 2,000,000
Sub Total 1) - 74,559,000 74,559,000
ALAT
1 Cangkul 1 - 10 bh 90,000 - 900,000 900,000
2 Sekop 2 - 2 bh 90,000 - 180,000 180,000
3 Palu 5 Kg 3 - 2 btg 80,000 - 160,000 160,000
4 Belincong 3 - 3 bh 45,000 - 135,000 135,000
5 Arco 3 3 Unit 550,000 1,650,000 1,650,000
6 Eber Aduk 20 20 Buah 15,000 300,000 300,000
7 Benang 4 4 Roll 5,000 20,000 20,000
8 Prasasti 1 1 Buah 300,000 300,000 300,000
Pengki 1 1 38,500 38,500 38,500
Sub Total 2) - 3,683,500 3,683,500
UPAH
1 Pekerja 391 280 111 HOK 100,000 28,000,000 11,100,000 39,100,000
2 Tukang 200 180 20 HOK 120,000 21,600,000 2,400,000 24,000,000

Sub Total 3) 49,600,000 13,500,000 63,100,000

Adinistrasi Kegiatan

1 Papan Kegiatan 1 1 150,000 150,000 150,000

2 Pelaporan 1 1 157,500 157,500 157,500

Sub Total 4) - 307,500 307,500

TOTAL BIAYA 49,600,000 92,050,000 141,342,500

provDari ban : 92,050,000


Sumber Dana
Dari Swadaya :

Catatan :
1. Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom swadaya.
2. Nilai RAB didapat dari kolom Volume dari Dana dikalikan dengan kolom Harga satuan yang kemudian ditotalkan.
3. Sumbangan dalam bentuk uang dimasukkan pada baris terbawah (sumber dana dari swadaya).
4. Swadaya dalam bentuk lahan ditulis dalam format lain.

Disetujui oleh : Diperiksa oleh : Dibuat oleh :


PjOK Fasilitator Teknik Ketua TPK Kader teknik

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN Form IV.8

92,050,000
15% 13,807,500
78,242,500

78,242,500

13,807,500

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


PNPM MANDIRI PERDESAAN Form IV.9
REKAPITULASI ANGGARAN BIAYA
Propinsi : Jawa Barat
Kabupaten : Bekasi
Kecamatan : Ligung
Desa : Buntu Lembar : 1/1

Kegiatan : Perkerasan Rabat Kegiatan : Gorong-Gorong Buis Kegiatan : Kegiatan :


Beton Beton
Bobot Bobot Bobot Bobot
No. URAIAN Ukuran : 200 m1 Ukuran : Ø 40 Panjang 4 M ( 2 Unit Ukuran : Ukuran : Bobot (%) JUMLAH TOTAL
(%) (%) (%) (%)
Jumlah : 1 UNIT Jumlah : 2 unit Jumlah : Jumlah :
No. RAB : 01. No. RAB : 2 No. RAB : 03. No. RAB :
PNPM Swadaya PNPM Swadaya PNPM Swadaya PNPM Swadaya PNPM Swadaya
I BAHAN
34,114,000 - 62.03 4,328,000 - - - 38,442,000 - 62.21
(tidak perlu dirinci)
II PERALATAN
7,212,500 - 13.11 266,000 1,568,000 - - 7,478,500 1,568,000 12.10
(tidak perlu dirinci)
III UPAH
13,670,000 - 24.86 2,205,000 - - - 15,875,000 - 25.69
(tidak perlu dirinci)
Jumlah 54,996,500 - 100 6,799,000 - - - 61,795,500 100

Jumlah Dibulatkan 61,795,000

IV Operasional UPK 2 % 1,300,000

V Operasional TPK 3 % 1,951,000

JUMLAH TOTAL 65,046,000 1,568,000

Jumlah Biaya Upah 13,670,000 - 2,205,000 - 2,205,000 - - - 15,875,000 -

Jumlah HOK Konstruksi 162 - HOK 1,454 - HOK 56 - 131 HOK 1,803 - HOK
HOK

Diketahui oleh, Dibuat oleh,


PjOK Fasilitator Kecamatan Fasilitator Teknik Ketua TPK Kader Teknik

Rumengan Tanggulungan, SE Agus Purwanto, S.Sos Equatoria Trengganis, ST cum Wijaya Ratim
Nip. 196609281993122001

Catatan :
Kolom "swadaya" diisi nilai swadaya dalam bentuk uang.

KECAMATAN KEDUNGWARINGIN KABUPATEN BEKASI


Compatibility Report for Rabat Nagasari.xls
Run on 2015/05/10 21:33

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.

Minor loss of fidelity # of occurrences

Some formulas in this workbook are linked to other work"ooks that are 59
closed. When these formulas are recalculated in earlier versions of Excel
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.
'IV.AHS (2)'!B2:B5

'IV.AHS (2)'!E2:E3

'IV.AHS (2)'!H48
'IV.AHS (2)'!H53:H55

'TOS TPT'!I32:I34
'TOS TPT'!I37:I38
'TOS TPT'!I43:I44
'TOS TPT'!I47:I48
'RAB. RABAT'!B4:B7

'RAB. RABAT'!E4:E5

'RAB. RABAT'!M7

'RAB. RABAT'!C85:C86

'RAB TELFORD'!B4:B7

'RAB TELFORD'!E4:E5

'RAB TELFORD'!M7

'RAB TELFORD'!C13:C15

'RAB TELFORD'!C83:C84

'RAB TPT'!B4:B7
'RAB TPT'!E4:E5
'RAB TPT'!M7
'REKAP RAB'!B2:B5

'REKAP RAB'!E2:E3
'REKAP RAB'!H25

'REKAP RAB'!M25

'REKAP RAB'!R25

'REKAP RAB'!H31

'REKAP RAB'!M31

'REKAP RAB'!AA31

Anda mungkin juga menyukai