URAIAN VOLUME SATUAN PEKERJA ORANG HARI HARGA UPAH JUMLAH

A B C D E F G H
PEMASANGAN KLOSET DUDUK TUKANG (DG. MANGKA) 1 13 150,000 1,950,000
13 SET
PEMASANGAN ACCECORIES DAN SETTING PIPA TUKANG (DG. LILI) 1 13 150,000 1,950,000
TOTAL 3,900,000
H÷B 300,000

URAIAN VOLUME SATUAN PEKERJA ORANG HARI HARGA UPAH JUMLAH

A B C D E F G H
PEMASANGAN JET WASHER 13 SET MANDOR (DG. MUANG) 1 5 150,000 750,000
TOTAL 750,000
H÷B 57,692

URAIAN VOLUME SATUAN PEKERJA ORANG HARI HARGA UPAH JUMLAH

A B C D E F G H
TUKANG (DG. BELLA) 1 3 150,000 450,000
PEMASANGAN WASHTAFEL 4 SET
TUKANG (DG. SIAJANG) 1 3 150,000 450,000
PEMASANGAN ACCECORIES DAN PIPA PEMBUANGAN 4 SET TUKANG (DG. SIJAYA) 1 1 150,000 150,000
TOTAL 1,050,000
H÷B 262,500

URAIAN VOLUME SATUAN PEKERJA ORANG HARI HARGA UPAH JUMLAH

A B C D E F G H
PEMASANGAN HOSPITAL SINK + ACC + BOBOKAN MEJA BETON 1 SET TUKANG (DG. BELLA) 1 1.5 150,000 225,000
TOTAL 225,000
H÷B 225,000

URAIAN VOLUME SATUAN PEKERJA ORANG HARI HARGA UPAH JUMLAH

A B C D E F G H
PEMASANGAN SINGLE SHOWER + KRAN 2 CABANG 4 SET MANDOR (DG. MUANG) 1 2 120,000 240,000
TOTAL 240,000
H÷B 60,000

URAIAN VOLUME SATUAN PEKERJA ORANG HARI HARGA UPAH JUMLAH

A B C D E F G H
PEMASANGAN SINGLE SHOWER + KRAN 2 CABANG 4 SET BURUH (JAKKOLO) 1 2 120,000 240,000
TOTAL 240,000
H÷B 60,000

URAIAN VOLUME SATUAN PEKERJA ORANG HARI HARGA UPAH JUMLAH

A B C D E F G H
TUKANG (DG. MANGKA) 1 2 150,000 300,000
PEMASANGAN FLOOR DRAIN AMERICAN STANDART TYPE IN 23 13 SET
TUKANG (DG. BELLA) 1 2 150,000 300,000
TOTAL 600,000
H÷B 46,154

URAIAN VOLUME SATUAN PEKERJA ORANG HARI HARGA UPAH JUMLAH

A B C D E F G H
PEMASANGAN TOWEL RAIL 5 SET BURUH (JAKKOLO) 1 2 120,000 240,000
TOTAL 240,000
ANALISA HARGA SATUAN PEK. SANITARY

SAT KOEF HARGA UPAH

PEMASANGAN 1 BUAH KLOSET DUDUK


UPAH:
PEKERJA OH 1.0 120,000
TUKANG BATU OH 1.5 150,000
KEPALA TUKANG OH 1.0 150,000
MANDOR OH 0.1 150,000

ACCECORIES + FIN. SEALANT (15% DARI JUMLAH)

PEMASANGAN 1 BUAH WASHTAFEL DUDUK


UPAH:
PEKERJA OH 1.2 120,000
TUKANG BATU OH 1.45 150,000
KEPALA TUKANG OH 0.15 150,000
MANDOR OH 0.1 150,000

ACCECORIES + FIN. SEALANT (15% DARI JUMLAH)

PEMASANGAN 1 BUAH JET WASHER


UPAH:
PEKERJA OH 0.1 120,000
TUKANG BATU OH 0.1 150,000
KEPALA TUKANG OH 0.1 150,000
MANDOR OH 0.05 150,000

ACCECORIES (10% DARI JUMLAH)

PEMASANGAN 1 BUAH FLOOR DRAIN AMERICAN STANDART TYPE IN


UPAH:
PEKERJA OH 0.10 120,000
TUKANG BATU OH 0.1 150,000
KEPALA TUKANG OH 0.10 150,000
MANDOR OH 0.05 150,000

PEMASANGAN 1 BUAH KERAN AIR


UPAH:
PEKERJA OH 0.1 120,000
TUKANG PIPA OH 0.1 150,000
KEPALA TUKANG OH 0.01 150,000
MANDOR OH 0.01 150,000

O.295 1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUN


A BAHAN
1 AC Split 1 unit
2 Alat Ban 1 set
B TENAGA
1 Pekerja 1 Oh
2 Tukang 1 Oh
3 Mandor 0.5 Oh
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)


E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
G Pembulatan dari HSP (F)
JUMLAH HARGA

120,000
225,000
150,000
15,000
510,000 -
76,500
586,500
144,000
217,500
22,500
15,000
399,000
59,850
458,850

12,000
15,000
15,000
7,500
49,500
4,950
54,450

CAN STANDART TYPE IN 23

12,000
15,000
15,000
7,500
49,500

12,000
15,000
1,500
1,500
30,000

DOOR AC SPLIT WALL MOUNTED TYPE, KAPASITAS 4500 BTUH, 1/2 PK

2,927,360 2,927,360
29,274 29,274

119,107 119,107
119,107 119,107
159,603 79,802
eralatan (A+B+C) 3,274,649
327,465
3,602,114
3,602,110
PEKERJAAN PENAWARAN MANDOR HARGA YANG DISETUJUI

INSTALASI SCRUB UP
BOBOKAN DINDING
INSTALASI PIPA AIR BERSIH DI ATAS PLAFOND DAN DINDING
INSTALL PIPA DALAM EQUIPMENT, FILTER UV, & SENSOR Rp 1,750,000 Rp 1,020,000
PLESTERAN, ACIAN, & PENGECATAN KEMBALI

INSTALASI SPOEL HOEK


BOBOKAN DINDING
INSTALL PIPA AIR BERSIH DI ATAS PLAFOND DAN DINDING
INSTALASI PIPA AIR LIMBAH KLINIS (SAMBUNGAN)
Rp 1,500,000 Rp 1,260,000
PIPA SALURAN BUANGAN AIR SISA (BOBOK PLAT LANTAI)
PLESTERAN, ACIAN, & PENGECATAN KEMBALI
PASANG SPOEL HOEK, FLUSH VALVE VACUM BREAKER, & KERAN (2 SET)

Notes:

INSTALASI SCRUB UP (5 HARI)


BOBOKAN DINDING PEKERJA/BURUH (RENDY) 1 ORANG 1 HARI 120,000 120,000
INSTALL PIPA AIR BERSIH ATAS PLAFOND DAN DINDING TUKANG PIPA (DG. LAWA & PIANK) 2 ORANG 2 HARI 150,000 600,000
INSTALL PIPA DALAM EQUIPMENT, FILTER UV, & SENSOR MANDOR (DG. MUANG) 1 ORANG 1 HARI 150,000 150,000
PLESTERAN, ACIAN, & PENGECATAN KEMBALI TUKANG BATU (DG.LAWA) 1 ORANG 1 HARI 150,000 150,000
1,020,000
INSTALASI SPOEL HOEK (11 HARI)
BOBOKAN DINDING PEKERJA/BURUH (JAKKOLO) 1 ORANG 1 HARI 120,000 120,000
INSTALL PIPA AIR BERSIH ATAS PLAFOND DAN DINDING MANDOR (DG. MUANG) 2 ORANG 3 HARI 150,000 900,000
INSTALASI PIPA SAMBUNGAN & PIPA SALURAN BUANGAN AIR SISA (BOBOK PLAT LANTAI) MANDOR (DG. MUANG & JAKKOLO) 2 ORANG 2 HARI 150,000 600,000
PLESTERAN, ACIAN, & PENGECATAN KEMBALI MANDOR (DG. MUANG & JAKKOLO) 2 ORANG 1 HARI 150,000 300,000
PASANG SPOEL HOEK, FLUSH VALVE VACUM BREAKER, & KERAN (2 SET) MANDOR (DG. MUANG & JAKKOLO) 2 ORANG 2 HARI 150,000 600,000
2,520,000
2 set 1,260,000

Disetujui Oleh, Diketahui Oleh, Dibuat Oleh,

Ir. H. Tajuddin Nur Hambali Ruslan Dg Muang


Direktur Proyek Direktur Proyek Subkontraktor/Pemborong
INSTALASI DAN PEMASANGAN UNIT INDOOR & OUTDOOR AC

PEKERJAAN PENAWARAN MANDOR HARGA YANG DISETUJUI

PEMASANGAN UNIT INDOOR & OUTDOOR

INSTALASI KABEL POWER KE PANEL


INSTALASI KABEL INDOOR KE OUTDOOR
INSTALASI KABEL STOP KONTAK INDOOR
BOBOKAN PLAFOND UNTUK JALUR PIPA REFRIGANT
INSTALASI PIPA REFRIGANT (PIPA TEMBAGA)
BOBOKAN DINDING
Rp 2,500,000 Rp 910,000
INSTALASI PIPA AIR BUANGAN AC (PIPA CONDUIT)
PEMBERSIHAN HASIL BOBOKAN
PENGISIAN FREON PIPA REFRIGANT
PERAPIHAN DINDING BEKAS BOBOKAN (PLESTER & ACI)
PENGECATAN KEMBALI BEKAS BOBOKAN DINDING
PEMASANGAN TEMPAT REMOTE AC
PERAPIHAN KEMBALI BOBOKAN PLAFOND
PENGECATAN KEMBALI BEKAS BOBOKAN PLAFOND

Notes:

PEMASANGAN UNIT INDOOR & OUTDOOR PEKERJA/BURUH (JAKKOLO) 1 ORANG 6 HARI 120,000 720,000
MANDOR (DG. MUANG) 1 ORANG 6 HARI 150,000 900,000

INSTALASI PIPA CONDUIT 20MM TUKANG (RURUNG) 1 ORANG 10 HARI 150,000 1,500,000
INSTALASI KABEL POWER KE PANEL TUKANG (PAPA IIN) 1 ORANG 10 HARI 150,000 1,500,000

INSTALASI KABEL INDOOR KE OUTDOOR PEKERJA/BURUH (RENDY) 1 ORANG 7 HARI 120,000 840,000
INSTALASI PIPA REFRIGANT (PIPA TEMBAGA) TUKANG (PAPA IIN) 1 ORANG 7 HARI 150,000 1,050,000
BOBOKAN PLAFOND

PENGISIAN FREON PIPA REFRIGANT TUKANG (PAPA IIN) 1 ORANG 4 HARI 150,000 600,000

BOBOKAN DINDING PEKERJA/BURUH (RENDY) 1 ORANG 8 HARI 120,000 960,000


INSTALASI PIPA AIR BUANGAN AC (PIPA CONDUIT) TUKANG (PAPA IIN) 1 ORANG 8 HARI 150,000 1,200,000

PERAPIHAN DINDING BEKAS BOBOKAN PEKERJA/BURUH (RENDY) 1 ORANG 5 HARI 120,000 600,000
PENGECATAN KEMBALI BEKAS BOBOKAN DINDING TUKANG (PAPA IIN) 1 ORANG 5 HARI 150,000 750,000
PEMBERSIHAN HASIL BOBOKAN
PEMASANGAN TEMPAT REMOTE AC

PERAPIHAN BOBOKAN PLAFOND TUKANG (PAPA KEVIN) 1 ORANG 2 HARI 150,000 300,000
PENGECATAN KEMBALI BEKAS BOBOKAN PLAFOND
10,920,000
12 UNIT 910,000

Disetujui Oleh, Diketahui Oleh, Dibuat Oleh,

Ir. H. Tajuddin Nur Hambali Ruslan Dg Muang


Direktur Proyek Direktur Proyek Subkontraktor/Pemborong
ANALISA HARGA SATUAN PEK. TATA UDARA

1 M' PEMASANGAN PIPA REFRIGERANT


A BAHAN
- Pipa Refrigerant + Armaflex 1.000
- Alat Bantu 1.000
B TENAGA
- Tukang Pipa 0.083
- Kepala Tukang Pipa 0.083
- Mandor 0.083
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)

1 UNIT PEMASANGAN INDOOR AC SPLIT WALL MOUNTED TYPE, KAPASITA


A BAHAN
AC Split Wall Mounted 1.00
Alat Bantu 1.00
B TENAGA
Pekerja 0.70
Tukang AC 0.70
Mandor 0.50
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)

1 UNIT TAMBAH FREON R32/R410 0,5 - 1 PK


A BAHAN
Freon R32/R410 1.00
Alat Bantu 1.00
B TENAGA
Pekerja 0.50
Tukang AC 0.50
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)

1 BUAH PEMASANGAN EXHAUST FAN 16 W


A BAHAN
- Exhaust Fan 1.00
- Instalasi Kabel 1.00
B TENAGA
- Tukang Listrik 0.60
- Kepala Tukang Listrik 0.60
- Mandor 0.05
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
EK. TATA UDARA

m disediakan
ls disediakan

Oh 136,973 11,414
Oh 150,075 12,506
Oh 159,603 13,300

37,221

37,221

UNTED TYPE, KAPASITAS 9000 BTUH, 1 PK

unit disediakan
set disediakan

Oh 119,107 83,375
Oh 119,107 83,375
Oh 159,603 79,802

246,551

246,551

tbg disediakan
set disediakan

Oh 119,107 59,553
Oh 119,107 59,553

119,107

119,107
bh disediakan
Titik disediakan

Oh 119,107 71,464
Oh 150,075 90,045
Oh 159,603 7,980

169,489

169,489
ANALISA HARGA SATUAN PEK. FINISHING

1 M2 PASANG CERMIN
A BAHAN
- Kaca cermin 1.000
- Join Pin Kaca 4.000
B TENAGA
- Pekerja 0.017
- Tukang 0.170
- Kepala tukang 0.070
- Mandor 0.090
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)

1 M' PASANG HANDRAIL STAINLESS STEEL


A BAHAN
- Stainless steel 1.00
- Bracket & Aksesories Lainya 1.00
B TENAGA
- Pekerja 0.12
- Tukang 0.12
- Kepala tukang 0.012
- Mandor 0.06
C PERALATAN
- Las listrik 0.17
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)

1 UNIT PASANG HOSPITAL GRABBAR DIFABLE


A BAHAN
- Grab Bar 1.00
- Bracket & Aksesories (perkuatan,dll) 1.00
B TENAGA
- Pekerja 0.15
- Tukang 0.10
- Kepala tukang 0.05
- Mandor 0.03
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
PEK. FINISHING

m2 disediakan
bh disediakan

Oh 120,000 2,040
Oh 150,000 25,500
Oh 150,000 10,500
Oh 150,000 13,500

51,540

51,540

m' disediakan
ls disediakan

Oh 120,000 14,400
Oh 150,000 18,000
Oh 150,000 1,800
Oh 150,000 9,000

jam 156,431 disediakan


43,200

43,200

bh disediakan
ls disediakan

Oh 119,107 17,866
Oh 136,973 13,697
Oh 150,075 7,504
Oh 159,603 3,990
43,057

43,057