A B C D E F G H
PEMASANGAN KLOSET DUDUK TUKANG (DG. MANGKA) 1 13 150,000 1,950,000
13 SET
PEMASANGAN ACCECORIES DAN SETTING PIPA TUKANG (DG. LILI) 1 13 150,000 1,950,000
TOTAL 3,900,000
H÷B 300,000
A B C D E F G H
PEMASANGAN JET WASHER 13 SET MANDOR (DG. MUANG) 1 5 150,000 750,000
TOTAL 750,000
H÷B 57,692
A B C D E F G H
TUKANG (DG. BELLA) 1 3 150,000 450,000
PEMASANGAN WASHTAFEL 4 SET
TUKANG (DG. SIAJANG) 1 3 150,000 450,000
PEMASANGAN ACCECORIES DAN PIPA PEMBUANGAN 4 SET TUKANG (DG. SIJAYA) 1 1 150,000 150,000
TOTAL 1,050,000
H÷B 262,500
A B C D E F G H
PEMASANGAN HOSPITAL SINK + ACC + BOBOKAN MEJA BETON 1 SET TUKANG (DG. BELLA) 1 1.5 150,000 225,000
TOTAL 225,000
H÷B 225,000
A B C D E F G H
PEMASANGAN SINGLE SHOWER + KRAN 2 CABANG 4 SET MANDOR (DG. MUANG) 1 2 120,000 240,000
TOTAL 240,000
H÷B 60,000
A B C D E F G H
PEMASANGAN SINGLE SHOWER + KRAN 2 CABANG 4 SET BURUH (JAKKOLO) 1 2 120,000 240,000
TOTAL 240,000
H÷B 60,000
A B C D E F G H
TUKANG (DG. MANGKA) 1 2 150,000 300,000
PEMASANGAN FLOOR DRAIN AMERICAN STANDART TYPE IN 23 13 SET
TUKANG (DG. BELLA) 1 2 150,000 300,000
TOTAL 600,000
H÷B 46,154
A B C D E F G H
PEMASANGAN TOWEL RAIL 5 SET BURUH (JAKKOLO) 1 2 120,000 240,000
TOTAL 240,000
ANALISA HARGA SATUAN PEK. SANITARY
120,000
225,000
150,000
15,000
510,000 -
76,500
586,500
144,000
217,500
22,500
15,000
399,000
59,850
458,850
12,000
15,000
15,000
7,500
49,500
4,950
54,450
12,000
15,000
15,000
7,500
49,500
12,000
15,000
1,500
1,500
30,000
2,927,360 2,927,360
29,274 29,274
119,107 119,107
119,107 119,107
159,603 79,802
eralatan (A+B+C) 3,274,649
327,465
3,602,114
3,602,110
PEKERJAAN PENAWARAN MANDOR HARGA YANG DISETUJUI
INSTALASI SCRUB UP
BOBOKAN DINDING
INSTALASI PIPA AIR BERSIH DI ATAS PLAFOND DAN DINDING
INSTALL PIPA DALAM EQUIPMENT, FILTER UV, & SENSOR Rp 1,750,000 Rp 1,020,000
PLESTERAN, ACIAN, & PENGECATAN KEMBALI
Notes:
Notes:
PEMASANGAN UNIT INDOOR & OUTDOOR PEKERJA/BURUH (JAKKOLO) 1 ORANG 6 HARI 120,000 720,000
MANDOR (DG. MUANG) 1 ORANG 6 HARI 150,000 900,000
INSTALASI PIPA CONDUIT 20MM TUKANG (RURUNG) 1 ORANG 10 HARI 150,000 1,500,000
INSTALASI KABEL POWER KE PANEL TUKANG (PAPA IIN) 1 ORANG 10 HARI 150,000 1,500,000
INSTALASI KABEL INDOOR KE OUTDOOR PEKERJA/BURUH (RENDY) 1 ORANG 7 HARI 120,000 840,000
INSTALASI PIPA REFRIGANT (PIPA TEMBAGA) TUKANG (PAPA IIN) 1 ORANG 7 HARI 150,000 1,050,000
BOBOKAN PLAFOND
PENGISIAN FREON PIPA REFRIGANT TUKANG (PAPA IIN) 1 ORANG 4 HARI 150,000 600,000
PERAPIHAN DINDING BEKAS BOBOKAN PEKERJA/BURUH (RENDY) 1 ORANG 5 HARI 120,000 600,000
PENGECATAN KEMBALI BEKAS BOBOKAN DINDING TUKANG (PAPA IIN) 1 ORANG 5 HARI 150,000 750,000
PEMBERSIHAN HASIL BOBOKAN
PEMASANGAN TEMPAT REMOTE AC
PERAPIHAN BOBOKAN PLAFOND TUKANG (PAPA KEVIN) 1 ORANG 2 HARI 150,000 300,000
PENGECATAN KEMBALI BEKAS BOBOKAN PLAFOND
10,920,000
12 UNIT 910,000
m disediakan
ls disediakan
Oh 136,973 11,414
Oh 150,075 12,506
Oh 159,603 13,300
37,221
37,221
unit disediakan
set disediakan
Oh 119,107 83,375
Oh 119,107 83,375
Oh 159,603 79,802
246,551
246,551
tbg disediakan
set disediakan
Oh 119,107 59,553
Oh 119,107 59,553
119,107
119,107
bh disediakan
Titik disediakan
Oh 119,107 71,464
Oh 150,075 90,045
Oh 159,603 7,980
169,489
169,489
ANALISA HARGA SATUAN PEK. FINISHING
1 M2 PASANG CERMIN
A BAHAN
- Kaca cermin 1.000
- Join Pin Kaca 4.000
B TENAGA
- Pekerja 0.017
- Tukang 0.170
- Kepala tukang 0.070
- Mandor 0.090
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C)
E Overhead & Profit 10 % X D
F Harga Satuan Pekerjaan (D+E)
m2 disediakan
bh disediakan
Oh 120,000 2,040
Oh 150,000 25,500
Oh 150,000 10,500
Oh 150,000 13,500
51,540
51,540
m' disediakan
ls disediakan
Oh 120,000 14,400
Oh 150,000 18,000
Oh 150,000 1,800
Oh 150,000 9,000
43,200
bh disediakan
ls disediakan
Oh 119,107 17,866
Oh 136,973 13,697
Oh 150,075 7,504
Oh 159,603 3,990
43,057
43,057