Anda di halaman 1dari 13

STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA

PEMERINTAH PRVINSI SULAWESI SELATAN


KOTA PARE-PARE
TAHUN 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
A. BAHAN DASAR
1 Aspal Bitumen (drum) Kg 13,500
Aspal Bitumen (curah) Kg 150,000
2 Abu Batu M³ 125,000
3 Batu Kali
* Utuh M³ 125,000
* Split 7 - 10 cm M³ 135,000
* Split 5 - 7 cm M³ 175,000
* Split 3 - 5 cm M³ 180,000
* Split 2 - 3 cm M³ 225,000
* Split 1 - 2 cm M³ 235,000
* Split 0.5 - 1 cm M³ 275,000
4 Batu Gunung M³ 125,000
Batu Border M³ 226,000
5 Timbunan
* Tanah M³ 38,750
* Pilihan M³ 50,000
* Tanah (Quarry) M³ 30,000
* Pilihan (Quarry) M³ 37,500
6 Batu Merah Buah 600
7 Batako 20x40x10 cm Buah 6,500
8 Gorong-gorong
* Diameter 20 cm 6x10x20 M¹ 80,000
* Diameter 30 cm 8x10x20 M¹ 145,000
* Diameter 40 cm Tebal 6 M¹ 185,000
* Diameter 50 cm Tebal 6 M¹ 260,000
* Diameter 60 cm Tebal 6 M¹ 267,000
* Diameter 80 cm Tebal 6 M¹ 384,330
* Diameter 100 cm Tebal 6 M¹ 512,440
9 Kapur Pasangan M³ 86,095
10 Kerikil Galian Royalti M³ 175,000
11 Kerikil Sirtu Royaliti M³ 187,500
12 Pasir
* Urug M³ 100,000
* Pasangan M³ 112,500
* Beton M³ 115,000
13 Paving Blok
* Segi empat 6x10x20 Buah 1,300
* Segi empat 8x10x20 Buah 1,580
* Segi enam Tebal 6 Buah 1,700
* Kacang Tebal 6 Buah 2,000
* Tiga berlian Tebal 6 Buah 1,500
* Bundar Tebal 6 Buah 1,610
14 Roster Krawang Buah 22,000
15 Sirtu M³ 81,250
16 Sirtu royalti M³ 105,000
17 Ijuk ikat 15,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
B. BAHAN KAYU
1 Kayu Kelas I
* Balok Ulin M³ 12,000,000
* Papan Ulin M³ 12,000,000
* Balok Bayam M³ 8,250,000
* Papan Bayam M³ 12,250,000
2 Kayu Kelas II
* Balok M³ 5,750,000
* Papan M³ 6,150,000
* Balok Kumia M³ 6,000,000
* Papan Kumia M³ 6,500,000
* Balok Kalapi M³ 6,500,000
3 Kayu Kelas III ( Bekisting )
* Balok M³ 1,800,000
* Papan M³ 1,800,000
4 Kayu Lapis
* 4 mm 8" x 4" Lembar 65,000
* 12 mm 8" x 4" Lembar 175,000
5 Kayu Les M' 15,000
6 Bambu Btg 28,000
7 Tripleks
* 0.2 cm 122 x 244 cm Lembar 42,500
* 0.3 cm 122 x 244 cm Lembar 50,000
* 0.4 cm 122 x 244 cm Lembar 65,000
* 0.6 cm 122 x 244 cm Lembar 75,000
* 0.9 cm 122 x 244 cm Lembar 105,000
8 Multipleks
* 6 mm Lembar 80,000
* 10 mm Lembar 150,000
9 List Profil Kayu Btg 15,000
10 Teakwood 4 mm ( 90 x 220 ) Lembar 130,000
C. BAHAN BESI
1 Besi Beton
* d = 4 mm SII-SNI Polos Btg 12,000
* d = 6 mm SII-SNI Polos Btg 27,250
* d = 8 mm SII-SNI Polos Btg 41,250
* d = 10 mm SII-SNI Polos Btg 61,000
* d = 12 mm SII-SNI Polos Btg 88,500
* d = 14 mm SII-SNI Polos Btg 127,500
* d = 16 mm SII-SNI Polos Btg 170,000
* d = 19 mm SII-SNI Polos Btg 195,000
* d = 22 mm SII-SNI Polos Btg 250,000
2 Besi Beton Polos kg 12,500
3 Besi Beton
* d = 10 mm SII-SNI Ulir Btg 57,000
* d = 12 mm SII-SNI Ulir Btg 75,000
* d = 14 mm SII-SNI Ulir Btg 135,000
* d = 16 mm SII-SNI Ulir Btg 180,000
* d = 19 mm SII-SNI Ulir Btg 200,000
* d = 22 mm SII-SNI Ulir Btg 275,000
4 Besi Beton Ulir kg 16,000
5 Besi Plat
* 2 mm 120x240 mm Lembar 550,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* 3 mm 120x240 mm Lembar 900,000
6 Besi Strip
* 30.2 mm Btg 20,000
* 30.3 mm Btg 30,000
* 35.4 mm Btg
* 40.4 mm Btg 50,000
* 40.6 mm Btg 75,000
* 50.6 mm Btg
7 Besi Siku
* 30.30.3 Btg 67,500
* 40.40.3 Btg 100,000
* 40.40.4 Btg 125,000
* 50.50.5 Btg 187,000
* 60.60.6 Btg 450,000
* 70.70.7 Btg 550,000
8 Besi Hollow
* Besi Hollow 20.20 Btg 67,500
* Besi Hollow 20.40 Btg 100,000
* Besi Hollow 40.40 Btg 132,500
* Besi Hollow 50.50 Btg 192,500
9 Besi Kotak d = 12 mm kg 15,985
10 Kawat
* Kawat Galvanis 0 3 mm Kg 12,500
* Kawat Galvanis 0 4 mm Kg 12,500
* Kawat Galvanis 0 5 mm Kg 12,500
* Licin 4 mm Kg 25,000
* Beton kg 20,000
* Bronjong d = 6 mm kg 25,000
* Bronjong Pabrikasi Uk. 2x10.5 m¹ Buah 350,000
* Nyamuk Meter 35,000
* Ayakan Kecil Meter 17,500
* Duri 100 m/roll Roll 200,000
12 Kuku Macan d = 1.5" Buah 28,000
d = 1.0" Buah 25,000
d = 0.5" Buah 20,000
13 Tali Seling d = 36 mm M¹ 213,900
d = 32 mm M¹ 157,000
d = 28 mm M¹ 80,500
d = 24 mm M¹ 72,500
d =19 mm M¹ 50,700
14 Paku
* Biasa Kg 17,600
* Asbes kg 51,600
* Seng (Payung) RRT kg 51,600
* Skrup 3½ inci kg 45,000
* Skrup 4 inci kg 60,000
* Payung Berulir 75 mm kg 50,000
* Sirap kg 25,000
* Beton kg 20,000
* Ramset bh 225,000
15 Baja Ringan (Main Truas) M²
16 Trus Canal / TS C75.75 Taso 6m 85,000
17 Reng U 45. 0.45 6m 55,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
18 Screw 12-16x16 bh 200
19 Screw 12-14x20 bh 250
20 Dyna Bolt 10.80 bh 7,000
21 Aluminium 4 inci (warna) M 119,500
22 Aluminium Composit Panel M² 255,300
23 Besi angkur dia =8 mm kg 10,500
24 Kawat las kg 25,000
25 Saringan Pasir M' 10,000
D. BAHAN LANTAI
1 Tegel PC
* PC Abu-abu 20x20 cm buah 2,308
* PC Abu-abu 30x30 cm buah 5,000
* PC Warna 20x20 cm buah 2,308
* PC Badak 20x20 cm buah 2,308
* PC Badak 30x30 cm buah 5,909
* PC Wafel 20x20 cm buah 2,415
* PC Wafel 30x30 cm buah 6,555
* Plint PC 15x20 cm buah 3,100
* Plint PC 15x20 cm buah 3,100
2 Tegel Mozaik
* Mozaik 30 30x30 cm buah 10,000
* Mozaik 20 20x20 cm buah 42,000
3 Tegel Keramik
* Putih 10x10 cm buah 1,380
* Warna 10x20 cm buah 1,300
* Putih 20x20 cm buah 2,500
* Warna 20x20 cm buah 3,000
* Putih 20x25 cm buah 3,250
* Warna 20x25 cm buah 3,750
* Putih 30x30 cm buah 5,000
* Warna 30x30 cm buah 7,100
* Putih 40x40 cm buah 12,500
* Warna 40x40 cm buah 16,700
* Putih 60x60 cm buah 105,500
* Warna ext Esenza / 60x60 cm buah 117,000
* Plint 11 11x11 cm buah 1,150
* Plint 20 20x25 cm buah 3,180
4 Glass Blok 6/dos dos 137,500
5 Kuku Tegel 180 bj/dos dos 92,500
6 Terasso 30x30 cm buah 70,000
40 x 40 cm buah 85,000
7 Parquet m2 265,000
8 Lem FOX putih kg 18,000
FOX kuning ( karet ) kg 50,000
9 keramik artistik 5 x 20 cm m2 57,500
10 x 20 cm m2 69,000
2
20 x 20 cm m 79,000
10 Granito 60x60 cm m2 210,000
11 Marmer 100 x 100 cm m2 504,000
40 x 40 cm m2 430,000
2
60 x 60 m 479,000
12 Batu Tempel / Alam Batu Andesid m2 150,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
Batu Alam m2 150,000
2
Batu Paras m 235,000
13 Wallpaper lbr 50 cm bh 350,000
14 Floor Hardener kg 10,695
E. BAHAN PIPA
1 Pipa PVC tipe AW
* Pipa PVC Tipe AW Ǿ 1/2" panjang 4 m Btg 20,000
* Pipa PVC Tipe AW Ǿ 3/4" panjang 4 m Btg 25,000
* Pipa PVC Tipe AW Ǿ 1" panjang 4 m Btg 35,000
* Pipa PVC Tipe AW Ǿ 1 1/2" panjang 4 m Btg 64,625
* Pipa PVC Tipe AW Ǿ 1 1/4" panjang 4 m Btg 55,000
* Pipa PVC Tipe AW Ǿ 2" panjang 4 m Btg 82,500
* Pipa PVC Tipe AW Ǿ 2 1/2" panjang 4 m Btg 108,000
* Pipa PVC Tipe AW Ǿ 3" panjang 4 m Btg 142,500
* Pipa PVC Tipe AW Ǿ 4" panjang 4 m Btg 222,500
* Pipa PVC Tipe AW Ǿ 5" panjang 4 m Btg 407,500
* Pipa PVC Tipe AW Ǿ 6" panjang 4 m Btg 525,000
* Pipa PVC Tipe AW Ǿ 8" panjang 4 m Btg 835,000
2 Pipa PVC tipe D
* Pipa PVC Tipe D Ǿ 1 1/4" panjang 4 m Btg 36,125
* Pipa PVC Tipe D Ǿ 1 1/2" panjang 4 m Btg 42,250
* Pipa PVC Tipe D Ǿ 2" panjang 4 m Btg 51,875
* Pipa PVC Tipe D Ǿ 2 1/2" panjang 4 m Btg 62,500
* Pipa PVC Tipe D Ǿ 3" panjang 4 m Btg 70,000
* Pipa PVC Tipe D Ǿ 4" panjang 4 m Btg 102,500
* Pipa PVC Tipe D Ǿ 5" panjang 4 m Btg 180,000
* Pipa PVC Tipe D Ǿ 6" panjang 4 m Btg 250,000
* Pipa PVC Tipe D Ǿ 8" panjang 4 m Btg 450,000
* Pipa PVC Tipe D Ǿ 10" panjang 4 m Btg 765,000
* Pipa PVC Tipe D Ǿ 12" panjang 4 m Btg 1,200,000

3 Pipa jenis Btg C untuk Instalasi Listrik


Φ 5/8 inci - 4 m btg 8,500
Φ 3/4 inci - 4 m btg 22,000
Φ 1 inci - 4m btg 35,000
Φ 1 1/2 inci - 4 m btg 35,000
Φ 2 inci - 4 m btg 45,000
4 Sambungan Pipa
a Knie
* Knie 1/2" Buah 3,000
* Knie 3/4" Buah 4,500
* Knie 1" Buah 6,000
* Knie 1 1/4" Buah 8,000
* Knie 1 1/2" Buah 10,000
* Knie 2" Buah 12,000
* Knie 3" Buah 15,000
* Knie 4" Buah 25,000
b Lurus
* Lurus 1/2" Buah 3,000
* Lurus 3/4" Buah 4,500
* Lurus 1" Buah 6,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* Lurus 1 1/4" Buah 8,000
* Lurus 1 1/2" Buah 10,000
* Lurus 2" Buah 12,000
* Lurus 3" Buah 15,000
* Lurus 4" Buah 25,000
c Tee
* Tee 1/2" Buah 3,500
* Tee 3/4" Buah 4,600
* Tee 1" Buah 5,600
* Tee 1 1/4" Buah 8,000
* Tee 1 1/2" Buah 10,000
* Tee 2" Buah 12,500
* Tee 3" Buah 20,000
* Tee 4" Buah 25,000
7 Isolasi Pipa Buah 5,000
F. BAHAN FINISHING CAT
1 Cat Tembok
* Avitex 5 Kg 105,000
* Metrolite 2.5 Kg 95,000
* Mowilex (Luar) 2.5 Kg 240,000
* Mowilex (Dalam) 2.5 Kg 150,000
2 Cat Besi Kg
3 Cat Kayu
* Glotex Kg 49,000
* Avian Kg 57,000
* Politur Kg 55,000
* Meni Kayu Kg 25,000
* Mowilex Liter 75,000
4 Minyak Cat kg 22,000
5 Minyak Bekisting Kg 20,000
6 Cat Atap
* Yoko 4 Kg 99,000
* AGA 4 Kg 180,000
7 Cat Anti Karat Kg 65,000
8 Cat Coating Liter
9 Dempul Kg 30,000
10 Dempul Jadi Kg 25,000
11 Ampelas Lembar 5,000
12 Kuas 4" Buah 20,000
13 Kuas 3" Buah 16,500
14 Kuas 2" Buah 12,500
15 Kuas 1" Buah 6,300
16 Plamir Kayu Kg 32,500
17 Plamir Tembok Kg 37,500
18 Politur Liter 50,000
19 Politur Jadi Liter
20 Vernis Liter 57,500
21 Pengencer Cat Kayu/Besi Kg 22,000
22 Cat genteng Kg
23 Kuas Roll Buah 40,000
24 Kapur Ayak Bks 46,000
25 Lem Kayu Kg 15,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
G. BAHAN KACA
1 Kaca
* Polos/Bening 2 mm M² 70,000
* Polos/Bening 3 mm M² 95,000
* Polos/Bening 5 mm M² 120,000
* Polos/Bening 8 mm M² 500,000
* Buram 3 mm M² 187,500
* Buram 5 mm 225,000
* Rayben 3 mm M² 105,000
* Rayben 5 mm M² 130,000
* Biru M² 275,000
* Cermin M² 450,000
* Gravire M² 1,000,000
* Lukis Alur M² 900,000
2 Rangka Nako Lengkap Terali 10 mm Set 180,000
3 Seal Besar Buah 60,000
4 Seal Kecil Buah 40,000
5 Sealant Tube 29,450
6 Sealant Kaca Kg 35,000
H. BAHAN LANGIT-LANGIT
1 Eternit 100x100 cm lembar 20,000
2 Tripleks
* 0.2 cm 122x244 cm lembar 40,000
* 0.3 cm 122x244 cm lembar 50,000
* 0.6 cm 122x244 cm lembar 75,000
* 0.9 cm 122x244 cm lembar 105,000
3 Tripleks Melamin 122x244x1.2 cm lembar 67,500
4 Akustik 40x60 cm lembar 52,000
5 Teakwood
* 0.4 cm 122x244 cm lembar 125,000
* 0.3 cm 122x244 cm lembar 130,000
* 0.3 cm 80x244 cm lembar 90,000
6 Hard Board 122x244 cm lembar 220,000
7 Asbes Plat Harfek 0.3 cm 200x100 cm lembar 45,300
8 Papan Gypsum
* 9 mm 120x240 cm lembar 62,500
* 12 mm 120x240 cm lembar 100,000
9 Papan Fiber Semen
* 6 mm 120x240 cm lembar 125,000
* 4 mm 120x240 cm lembar 57,500
10 List Profil Kayu
* 2x3 cm lembar 13,000
* 3x3 cm lembar 15,000
* 4x4 cm lembar 17,000
* 5x5 cm lembar 20,000
11 List Profil Gypsum
* 17 x 210 cm lembar 27,000
* 12 x 210 cm lembar 25,000
12 Multipleks
* 6 mm lembar 75,000
* 10 mm lembar 110,000
I. BAHAN ATAP
1 Genteng

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* Beton Buah 35,000
* Keramik lembar 15,000
* Asbes lembar 45,000
* Harflex (115x0.5) kaki 65,000
2 Asbes Gelombang 5 mm 7 kaki 6,000
3 Seng Kelombang
* BWG 34" BJLS 0.20 mm kaki 6,125
* BWG 33" BJLS 0.22 mm kaki 9,167
* BWG 32" BJLS 0.22 mm kaki 11,667
* BWG 28" BJLS 0.35 mm kaki 14,167
4 Seng Plat
* BJLS 0.30 mm Lembar 65,000
* BJLS 0.28 mm Lembar 80,000
5 Genteng Metal
* Kualitas 1 Lembar 85,000
* Kealitas 2 Lembar 47,000
6 Seng aluminium Gelombang
* SWG 32" 0.27 mm Lembar 20,500
* SWG 32" 0.31 mm Lembar 22,100
* SWG 32" 0.38 mm Lembar 30,613
7 Spandeck / Essar Deck
* 75 cm x 0.40 cm M² 50,000
* 76 cm x 0.40 cm M²
8 Seng Plastik (Fiber) Kaki 15,000
9 Fiber Semen (Harflex)
* Super 240x108x0.6 cm Lembar 72,500
* Super 180x108x0.6 cm Lembar 65,000
* Ekonomi 240x29x0.5 cm Lembar 65,000
* Ekonomi 180x29x0.5 cm Lembar 60,000
* Mini 240x105x0.4 cm Lembar 60,000
* Mini 180x105x0.4 cm Lembar 55,000
* Super 240x105x0.4 cm Lembar 62,500
* Super 180x105x0.4 cm Lembar 57,000
10 Nok / Bubungan
* Genteng Metal Buah 30,000
* Genteng Asbes Buah 25,000
* Genteng Keramik Buah 24,200
* Alm. SWG 28" - 180 cm Lembar 59,000
* Alm. SWG 28" - 105 cm Lembar 40,000
11 Nok Steel Gelombang
* Super 180 cm Buah 50,000
* Mini 105 cm Buah 40,000
* ekonomi 95 cm Buah 20,000
12 Nok Steel Rata
* Super 180 cm Lembar 45,000
* Mini 105 cm Lembar 25,000
* ekonomi 95 cm Lembar 20,900
13 Nok 1/2 Lingkungan Lembar 37,000
14 Nok Spandek 40 cm
* 40 cm x 0.40 cm 120x240 mm Lembar 57,000
* 30 cm x 0.25 cm 212x240 mm Lembar 38,000
15 Karet Pelapis Genteng
* Lebar 55 cm M¹

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* Lebar 90 cm M¹
* Lebar 120 cm M¹
16 Talang Jurai Aluzinc (Baja Ringan)
* Jurai Aluzinc (Baja Ringan) M
* Setengah Lingkaran Btg 45,000
* Segi Empat Btg 25,000
17 Corong Talang
* Setengah Lingkaran Buah 60,000
* Segi Empat Buah 50,000
18 Sambungan Talang Buah 15,000
19 List Plank Papan Semen (superplank)
* 10 x 244 x 0.9 cm Lembar 32,500
* 20 x 244 x 0.9 cm Polos Lembar 65,000
* 30 x 244 x 0.9 cm Polos Lembar 85,000
* 20 x 244 x 0.9 cm Urat Lembar 75,000
* 30 x 244 x 0.9 cm Urat Lembar 110,000
20 Rangka Baja
* Untuk Atap Spandek M² 192,800
* Untuk Atap Genteng Metal M² 201,000
21 Suryaroof Lembar 52,500
22 Multiroof Lembar 83,500
J. BAHAN PENGGANTUNG
1 Door Closer Buah 250,000
2 Door Holder Buah 30,000
3 Floor Drain
* Floor Drain PVC Buah 25,000
* Floor Drain Stainless Buah 25,000
4 Engsel
* Engsel Angin Buah 15,000
* Engsel Jendela Buah 20,000
* Engsel Pintu ( kw 2 ) Buah 17,500
* Engsel Pintu ( kw 1 ) Buah 30,000
* Engsel Kupu-kupu Buah 15,000
* Engsel Lengan Jendela Buah 20,000
5 Kait Angin Buah 22,500
6 Kunci Lemari Buah 25,000
7 Kunci Selot Buah 40,000
8 Kunci Silinder Buah 60,000
9 Kunci Tanam
* Union 2x Slag (Biasa) Buah 35,000
* Benotti 2x Slag (semacamnya) Buah 175,000
* Ses 2x Slag (semacamnya) Buah 250,000
* Ses 1x Slag (semacamnya) Buah 203,500
10 Spring Knip Buah
11 Gerendel Tanam /Psg 175,000
12 Grendel Biasa Buah 15,000
13 Handle pintu Buah 150,000
14 Rel Pintu Sorong Buah 450,000
15 1 Set Kunci Pintu ( kw 1 ) Buah 200,000
16 1 Set Kunci Pintu ( kw 2 ) Buah 150,000
17 Expanyolet Buah 125,000
Buah

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5

K. BAHAN SANITAIR
1 Kloset duduk KIA (Lengkap) Buah 1,500,000
Toto 1 Tombol 1,850,000
2 Kloset Jongkok KIA Buah 250,000
Toto Warna 370,000
3 Wasthafel Gantung Keramik Buah 750,000
4 Wasthafel Cuci Piring 1 Mata Buah 175,000
5 Wasthafel Cuci Piring 2 Mata Buah 750,000
6 Pompa Tangan Terpasang Buah 139,250
7 Pompa Air Sanyo Buah 1,500,000
8 Urinoir Buah 1,750,000
9 Bak Mandi Fiber Buah 1,000,000
10 Reservoir Fiber = 1 M³ Buah 1,300,000
11 Reservoir Fiber = 2 M³ Buah 2,750,000
12 Stop Kran Buah 10,000
13 Tempat Sabun Keramik Buah 50,000
14 Kran Air
* Biasa Buah 20,500
* Angsa Buah 100,000
* Kristal Buah 150000
* Pembuangan Kolam Buah 20,000
15 Pintu KM/WC (180x70) cm (fiber) Buah 235,000
16 Pintu KM/WC (180x70) cm (alumunium) Buah 250,000
17 Door Closer Buah 187,500
18 Floor drain Buah 25,000
L. BAHAN INSTALASI LISTRIK
1 Pipa Union Untuk Kabel
Φ 5/8 inci - 4 m Btg 8,250
Φ 1 inci - 4 m Btg 37,500
Φ 1 1/2 inci - 4 m Btg 64,500
Φ 2 inci - 4 m Btg 82,000
2 Lampu Neon
* 1x20 W Philips Buah 15,000
* 2x20 W (Pakai Kap) Philips Buah 154,000
* 1 x 36 W Buah 18,000
* 1x40 W Buah 20,000
* 2x36 W (Pakai Kap) Buah 65,000
* 2x40 W (Pakai Kap) Buah 65,000

3 Lampu Pijar
* 24 Watt 9,000
* 25 Watt Buah
* 40 Watt Buah 10,000
* 42 Watt Buah 10,000
* 52 Watt Buah 10,000
* 60 Watt Buah 10,000
* 100 Watt Buah 25,000
4 Lampu Tanam Mercury (Lam. Jln SON) Buah 225,000
5 Shakelar Phase
* Coklat Buah 55,000
* Putih Tunggal Buah 17,000
* Putih Ganda Buah 26,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
6 Fitting Buah 10,000
7 Exhaust Besar
* Panasonic (dinding) Buah 425,000
* Panasonic (plafond) Buah 450,000
8 Exhaust sedang 26,000
* Panasonic (dinding) Buah 375,000
* Panasonic (plafond) Buah 400,000
9 Down Light
Φ 4 Inci Buah 50,000
Φ 3.5 inci Buah 44,000
10 Travo
* TL 10 Watt Buah 35,000
* TL 20 Watt Buah 40,000
* TL 30 Watt Buah 40,000
11 Lampu SL 32 Watt Buah 60,000
12 Lampu SL 42 Watt Buah 70,000
13 Lampu TL 2 X 18 Watt Buah 28,000
14 Lampu TL 2 X 36 Watt Buah 32,000
15 Lampu SON-T 150 Watt ( komplit set) Set 280,000
16 Lampu HPI.T 250 W /220 V Komplit Set Set 750,000
17 Lampu HPI.T 400 W /220 V Komplit Set Set 750,000
18 Lampu Hias Selang M' 1,400,000
19 Traffo SON.T 150 W /220 V Buah 210,000
20 MCB 6 A Masko/3p Buah 100,000
21 MCB 10 A Scheineider/1p Buah 50,000
22 MCB 25 A Scheineider/1p Buah 56,667
23 MCB 30 A Buah 85,000
24 Kabel NYM 2 x 1,5 mm2 Eterna m' 7,500
25 Kabel NYM 2 x 2,5 mm2 Eterna m' 10,000
26 Kabel NYM 2 x 4 mm2 m' 25,000
27 Kabel NYM 3 x 1,5 mm2
28 Kabel NYM 3 x 2,5 mm2
29 Kabel NYM 3 x 4 mm2
30 Kabel NYM 3 x 1,5 mm2
31 Kabel NYM 3 x 2,5 mm2
32 Kabel NYM 3 x 4 mm2
33 Kabel NYM 4 x 4 mm2
34 Kabel NYM 4 x 6 mm2
35 Kabel NYM 1,5 mm2
36 Kabel NYM 2,5 mm2
37 Kap Hijau E 27
38 Kap Hijau E 40
39 Ballast TL 36
40 Fitting Lampu Pijar
41 Isolasi Biasa 3 M
42 Kabel Twisted 2 x10 mm
43 Kabel Twisted 2 x16 mm
44 Kapasitor HPI-T
45 Lampu Sorot LED 10 watt
46 Lampu Sorot LED 100 watt
47 Lampu Natal
48 Lampu Selang LED
49 Lampu Sumpit 45 W

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
50 Lampu Spiral 52 W
51 Lampu LED 3 Watt
52 Lampu LED 3,5 Watt
53 Lampu LED 4 Watt
54 Lampu LED 5 Watt
55 Lampu LED 9 Watt
56 Lampu LED 13 Watt
57 Lampu LED 18 Watt
58 Lampu LED 23 Watt
59 Lampu TL 36 W
60 Lampu TL 20 W
61 MCB 2 A
62 MCB 4 A
63 MCB 6 A
64 MCB 50 A
65 MCB 63 A
66 Stop Kontak 3 mata
67 Terminal 4 mm
68 Timer
69 Paku Sadel
70 Sambungan Fitting( over fitting )
71 Mata gurinda kecil
72 Mata gurinda potong 14'
73 Gurinda Besi
74 Kacamata Las
75 Fotocell 3 A
76 Lampu strip
77 Testpen
78 Obeng Min
79 Obeng Kembang
80 Silicon

M. BAHAN BAKAR MINYAK


1 Pertamax Ltr 8,600
2 Pertalite Ltr 7,700
3 Solar Ltr 5,150
4 Bensin Ltr 6,450
5 Thinner A Ltr 35,000
6 Minyak Cat Kg 20,000

N BAHAN PEREKAT
1 Semen PC ( 40 kg )
* Tonasa
* Bosowa
* Putih Tiga Roda
2 Semen PC ( 50 kg )
* Tonasa
* Bosowa
* Putih Tiga Roda
3 Semen Warna
4 Perekat untuk walpaper
5 Semen nat

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
O BAHAN DRAINASE
1 U - Ditch 600 x 600 mm, panjang 1,2 m unit 805,200
2 U - Ditch 800 x 800 mm, panjang 1,2 m unit 1,168,200

P BAHAN BETON PRECAST


1 Tiang pancang pratekan pracetak Ǿ 400 mm Kelas A2(Bottom) M' 411,400
spun piles
2 Tiang pancang pratekan pracetak Ǿ 400 mm Kelas A2(Middle) M' 446,600
spun piles
3 Tiang pancang pratekan pracetak Ǿ 500 mm Kelas A2(Bottom) M' 618,200
spun piles
4 Tiang pancang pratekan pracetak Ǿ 500 mm Kelas A2(Middle) M' 672,100
spun piles
5 Sheetpile type CCSP W.325.1000 kls A M' 930,000
6 Sheetpile type CCSP W.350.1000 kls A M' 1,072,500

Q UPAH KERJA
1 Mandor Lapangan Orang/Hari 165,000
2 Kepala Tukang Kayu Orang/Hari 141,000
3 Kepala Tukang Batu Orang/Hari 141,000
4 Kepala Tukang Listrik Orang/Hari 141,000
5 Kepala Tukang Cat Orang/Hari 141,000
6 Kepala Tukang Pipa Orang/Hari 141,000
7 Kepala Tukang Besi Orang/Hari 141,000
8 Tukang Kayu Orang/Hari 124,000
9 Tukang Batu Orang/Hari 124,000
10 Tukang Listrik Orang/Hari 124,000
11 Tukang Cat Orang/Hari 124,000
12 Tukang Pipa Orang/Hari 124,000
13 Tukang Besi Orang/Hari 124,000
14 Tukang Listrik Orang/Hari 124,000
15 Tukang Pipa Orang/Hari 124,000
16 Pekerja Orang/Hari 124,000
17 Mekanik Orang/Hari 141,000
18 Sopir Orang/Hari 130,000
19 Pembantu Sopir Orang/Hari 106,000
20 Operator Orang/Hari 141,000
21 Pembantu Operator Orang/Hari 106,000
22 Penjaga Malam Orang/Hari 106,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018