Anda di halaman 1dari 290

REKAPITULASI

PROYEK : RUMAH KOST 2 LANTAI LUAS BANGUNAN 412,74 M2


LOKASI : SOLO - JAWATENGAH HARGA PERM2 4,739,227.91

NO URAIAN PEKERJAAN SUB JUMLAH (Rp) JUMLAH (Rp)

I PEKERJAAN PERSIAPAN 76,081,107.88


II PEKERJAAN TANAH DAN PONDASI 103,365,250.00
III PEKERJAAN STRUKTUR BETON LANTAI 1 112,078,367.76
IV PEKERJAAN STRUKTUR BETON LANTAI 2 257,064,052.46
V PEKERJAAN BETON DAK ATAP 68,771,000.00
VI PEKERJAAN DINDING 379,500,000.00
VII PEKERJAAN KUSEN PINTU DAN JENDELA 76,105,518.58
VIII PEKERJAAN PENUTUP ATAP 47,411,137.33
IX PEKERJAAN PLAFOND 82,554,159.74
X PEKERJAAN LANTAI 267,254,514.31
XI PEKERJAAN SANITER DAN PEMIPAAN 178,571,962.86
XII PEKERJAAN LISTRIK 159,904,854.80
XIII PEKERJAAN PENGECATAN 147,407,000.00

JUMLAH 1 - XIII 1,956,068,925.72

LUAS RUMAH KOST 412.74 M2 HARGA PER M2 4,739,227.91

KEUNTUNGAN PEMBORONG 15% 293,410,338.86

JUMLAH TOTAL BIAYA 2,249,479,264.57

HARGA BELUM TERMASUK IMB DAN PERIJINAN LAIN NYA


PASANG DAYA
MCB
RENCANA ANGGARAN BIAYA (R A B)
Proyek/Pekerjaan : Rumah Kost 2 Lantai
Lokasi : Solo - Jawa Tengah

HARGA
NO JENIS PEKERJAAN VOLUME SAT SATUAN JUMLAH
(RP) (Rp)

l PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet dan Gudang Bahan 18.00 M2 1,927,751.05 34,699,518.81
2 Pengukuran Site Kembali 264.50 M2 750.00 198,375.00
3 Pembersihan dan perataan Site Kembali 264.50 m2 1,500.000 396,750.00
4 Pasangan Pagar Pengaman Proyek 67.50 M1 530,169.84 35,786,464.07
5 Keamanan 1.00 ls 5,000,000.00 5,000,000.00
JUMLAH - l 76,081,107.88

ll PEKERJAAN TANAH DAN PONDASI


1 Pasangan Papan Bouwplank 74.92 m1 60,000.00 4,495,200.00
2 Galian Tanah Untuk Pondasi Batu Kali 197.98 m1 150,000.00 29,697,000.00
3 UruganTanah Kembali Bekas Galian 98.99 m3 50,000.00 4,949,500.00
4 Pas. Pondasi Batu Kali/Batu Belah 89.091 m3 600,000.00 53,454,600.00
5 Pas.anstamping batu belah 20.7879 m3 500,000.00 10,393,950.00
6 Pas.pondasi rolag 2.5 m2 150,000.00 375,000.00
JUMLAH - ll 103,365,250.00

lll PEKERJAAN STRUKTUR BETON LANTAI 1


1 Pas. Pondasi Telapak 60x60x20 (Type P1) 18 bh 1.296 m3 2,322,623.22 3,010,119.69
2 Pas. Pondasi Telapak 80x80x20 (Type P2) 8 bh 1.024 m3 1,499,287.56 1,535,270.46
3 Pas. Sloop Beton uk 15x20 (Type SL 1) K-225 4.13 m3 4,000,000.00 16,528,000.00
4 Pas. Sloop Beton uk 15x30 (Type SL 2) K-225 2.711 m3 4,000,000.00 10,844,000.00
5 Pas. Kolom Beton Utama uk 15x40 (Type K-1) K225 8.184 m3 4,000,000.00 32,736,000.00
6 Pas. Kolom Praktis uk 15x15 (Type KP 1) dinding K-225 2.636 m3 4,000,000.00 10,544,000.00
7 Pas. Kolom Praktis uk 12x12 (Type KP2) openingan kusen 0.612 m3 4,000,000.00 2,448,000.00
8 Pas. Ring balok kusen 10x15/balok lintel 0.810 m3 4,000,000.00 3,240,000.00
9 Pas. Lisplank beton / janggutan 0.400 m3 2,774,944.03 1,109,977.61
10 Pas. Tangga beton 1.681 m3 6,000,000.00 10,086,000.00
11 Pas. Topian beton t= 10 cm 1.037 m3 6,000,000.00 6,222,000.00
12 Pas. Reling tangga 27.55 m1 500,000.00 13,775,000

JUMLAH - lll 112,078,367.76


IV PEKERJAAN STRUKTUR BETON LANTAI 2
1 Pas. Lantai Beton +wiremesh m8 + bondeck 202.46 m2 388,387.10 78,632,852.46
2 Pas. Balok utama uk 15x35 type (B1) 24 m3 4,000,000.00 96,000,000.00
3 Pas. Balok anak uk 15x25 type (B2) 4.807 m3 4,000,000.00 19,228,000.00
4 Pas. Kolom utama uk 15x40 6.432 m3 4,000,000.00 25,728,000.00
5 Pas. Kolom praktis uk 15x15 KP 1 (dinding) 3.241 m3 4,000,000.00 12,964,000.00
6 Pas. kolom praktis uk 12x12 KP 2 (kusen) 0.468 m3 4,000,000.00 1,872,000.00
7 Pas. Ring balok atas dinding/atap uk 15x20 2.830 m3 4,000,000.00 11,320,000.00
8 Pas. Ring balok ampig atap genteng 2.162 m3 4,000,000.00 8,648,000.00
9 Pas. Kolom praktis ampig atap genteng 0.668 m3 4,000,000.00 2,671,200.00

JUMLAH - lV 257,064,052.46
V PEKERJAAN BETON DAK ATAP
1 Pas. Plat Lantai beton dak atap t=14 cm 74.37 m2 700,000.00 52,059,000.00
2 Pas. Balok dak uk 15x25 type BD1(dak atap) 2.464 m3 4,000,000.00 9,856,000.00
3 Pas. Balok dak uk 15x30 type BD 2(dak atap) 1.714 m3 4,000,000.00 6,856,000.00

JUMLAH V 68,771,000.00
VI PEKERJAAN DINDING
1 Pek. Dinding bata merah 1 : 3 1,100.00 m2 125,000 137,500,000.00
2 Pek. Plesteran 2,200.00 m2 70,000 154,000,000.00
3 Pek. Acian 2,200.00 m2 40,000 88,000,000.00

JUMLAH VI 379,500,000
VII PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pas. pintu sliding dan 2 jendela pintu utama (TYPE PJ1) 1 unit 1 bh 7,500,000.00 7,500,000.00
2 Pas. Kusen pintu, jendela dan bovenlight alm 4''ALEXINDO 247.29 m1 120,000.00 29,674,800.00
3 Pas. Daun pintu dobel teakwood 22 bh 650,000.00 14,300,000.00
4 Pas. Daun pintu pvc untuk km (PVCLUX-KACA ES) 20 bh 518,000.00 10,360,000.00
5 Pas. Bingkai Daun jendela dan pintu 47.68 m1 100,000.00 4,768,000.00
6 Pas. kaca polos 5 mm 51.398 m2 184,884.99 9,502,718.58
JUMLAH VII 76,105,518.58
VIII PEKERJAAN PENUTUP ATAP
1 Pas. Kontruksi Atap Baja Ringan 119.64 m2 150,000.00 17,946,000.00
2 Pas. Penutup Atap Genteng Metal berpasir 119.64 m2 150,000.00 17,946,000.00
3 Pas. Bubungan /nok Genteng Metal 23.89 m1 138,097.00 3,299,137.33
4 Pas. Atap canopy solartuff rangka baja ringan+masang 11.62 m2 450,000.00 5,229,000
5 Pas. Almunium Foil 119.64 m2 25,000.00 2,991,000
JUMLAH VIII 47,411,137
IX PEKERJAAN PLAFOND
1 Pas. Gypsum 9 mm 367.05 m2 77,097.35 28,298,583.20
2 Pas. List profil 10 cm 523.97 m1 7,000.00 3,667,790.00
3 Pas. Rangka Holo 4x4x2 modul 60x60 367.05 m2 137,822.60 50,587,786.54
JUMLAH IX 82,554,159.74

X PEKERJAAN LANTAI
1 Urugan pasir di bawah lantai t=5cm 15.19 m3 44,427.40 674,852.25
2 Pluran/Lantai kerja t=3cm 15.19 m3 71,894.00 1,092,069.86
3 Pas. Keramik tile uk 40x40 tektur untuk teras depan 1.60 m2 293,258.38 469,213.41
4 Pas. Keramik tile uk 40x40 polos untuk ruangan 302.25 m2 287,455.85 86,883,530.66
5 Pas. Keramik tile uk 40x40 tektur untuk t.jemur 14.43 m2 287,455.85 4,147,987.92
6 Pas. Keramik 20x20 tektur untuk Lantai Kamar Mandi 35.00 m2 293,808.35 10,283,292.25
7 Pas. Keramik 20x25 untuk dindng km , t=3 meter 301.40 m2 349,601.45 105,369,877.03
8 Pas. Plin keramik uk 10x40 523.97 m1 70,024.36 36,690,664.43
9 Pas. Paving block carport t= 5cm 73.55 m2 294,262.77 21,643,026.50

JUMLAH X 267,254,514.31

XI PEKERJAAN SANITER DAN PEMIPAAN


A Perlengkapan Saniter
1 Pas. Closet duduk toto type standar lengkap+jet washer 20.00 bh 2,703,045.56 54,060,911.20
2 Pas. Shower lengkap TOTO crome 20.00 bh 1,052,519.56 21,050,391.20
3 Pas. Kran air dia 1/2 '' tembok ABS (RYUIICHI) FAW 012 1/2'' 22.00 bh 124,516.08 2,739,353.85
4 Pas. Floordrain stainless dia 3'' FIORENTINO 29.00 bh 105,646.04 3,063,735.02
5 Pas. Piper holder (tempat tisu) STAINLESS 20.00 bh 95,000.00 1,900,000.00

B Pek. Instalasi air bersih dan air kotor


1 Pas. Pipa air bersih pvc dia 1/2'' WAVIN aw lengkap 239.00 m1 28,420.47 6,792,491.73
2 Pas. Pipa air bersih pvc dia 3/4'' WAVIN aw lengkap 88.00 m1 38,036.50 3,347,212.26
3 Pas. watertorn kapasitas 1000 liter penguin TW 110 4.00 unit 1,499,000.00 5,996,000.00
4 Pas. pipa air kotor pvc dia 2'' maspion aw lengkap m1
5 Pas. pipa air kotor pvc dia 3'' WAVIN D lengkap 175.50 m1 80,062.13 14,050,904.12
6 Pas. pipa air kotor pvc dia 4'' WAVIN D lengkap 75.00 m1 112,147.13 8,411,034.88
7 Pas. septiktank biofil kap 2500 l.untuk 10 orang JRH-15 V 2.00 unit 4,620,796.02 9,241,592.04
8 Bak kontrol uk 60X60 CM 1.00 unit 700,000.00 700,000.00
9 Pas. Roof drain 3'' ALMUNIUM 10.00 bh 78,146.04 781,460.35
10 Pas. Stop kran 6.00 bh 94,646.04 567,876.21
11 Pas. Sumur bor (pompa submersible) 1,5 HP1PHASE 4 INC 1.00 unit 2,400,000.00 2,400,000.00
12 Pas. Pompa tarik SHIMITSU 2.00 unit 742,500.00 1,485,000.00
13 Pas. pompa dorong SHIMITSU 2.00 unit 742,000.00 1,484,000.00
14 Pas. Ground tank /bak tampung dari pdam/1000 L 1.00 unit 3,500,000.00 3,500,000.00
15 Pas. water heater kapasasitas 300 liter HONEY WELL 1.00 unit 33,000,000.00 33,000,000.00
16 Sumur resapan buis beton 80 cm/dalam 4 meter 2.00 unit 2,000,000.00 4,000,000.00
JUMLAH XI 178,571,962.86

XII PEKERJAAN LISTRIK


1 Pas.instalasi titik lampu+out let saklar 96 ttk 294,508.65 28,272,830.04
2 Pas.instalasi stop kontak 65 ttk 294,508.65 19,143,062.01
3 Pas.box sekrIng+mcb 2 ttk 0.00
4 Kabel jalur 3x2,5 mm 200 m1 89,846.91 17,969,382.50
5 Sambungan listrik PLN watt 0.00
6 Lampu downlight 4'' 18 watt (IN-BOW) PANASONIC 46 ttk 116,258.65 5,347,897.73
7 Lampu downlight 3'' watt (IN-BOW) 40 ttk 100,733.65 4,029,345.85
8 Lampu dinding hias SL6713 4 ttk 234,133.65 936,534.59
9 Lampu beton exposed BARET KOTAK 1 ttk 264,608.65 264,608.65
10 Exaust fan kamar mandi 21 ttk 267,483.65 5,617,156.57
11 Saklar tunggal PANASONIC 20 ttk 87,025.65 1,740,512.93
12 Saklar Ganda PANASONIC 27 ttk 87,060.15 2,350,623.95
13 Pemasangan UNIT AC SPLIT 1/5 PK SAMSUNG +stop kontak 21 UNIT 3,534,900.00 74,232,900.00
JUMLAH XII 159,904,854.80

XIII PEKERJAAN PENGECATAN


1 Pengecatan dinding bagian luar/exterior dgn cat dulux 125 m2 50,000.00 6,250,000.00
weathersield setara
2 Pengecatan dinding bagian dalam/interior dgn vinilex 2002.97 m2 50,000.00 100,148,500.00
3 Pengecatan dinding samping /blkng cat kedap air nodrop 453.12 m2 50,000.00 22,656,000.00
4 Pengecatan plafond dengan vinilex 367.05 m2 50,000.00 18,352,500.00

JUMLAH XIII 147,407,000.00


ANALISA HARGA SATUAN PEKERJAAN
PERATURAN MENTERI PUPR NO. 28/PRT/M/2016

A.2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN

Jenis Pekerjaan : A.2.2.1.1. (K3) Pembuatan 1mPagar Sementara dari Kayu Setinggi 2 m

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.400
- Tukang Kayu L.02 O/H 0.200
- Kepala Tukang L.03 O/H 0.020
- Mandor L.04 O/H 0.020
JUMLAH TENAGA KERJA
B BAHAN
- Dolken Kayu 8-10/400 cm Batang 1.250
- Semen Portland Kg 5.000
- Pasir Beton m3 0.005
- Koral Beton m3 0.009
- Kayu 5/7 m3 0.072
- Paku Biasa 2 - 5 cm Kg 0.060
- Residu Liter 0.400
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 10 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.2.1.2. (K3) Pembuatan 1m2 Pagar Sementara dari Seng Setinggi 2 m

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.400
- Tukang Kayu L.02 O/H 0.200
- Kepala Tukang L.03 O/H 0.020
- Mandor L.04 O/H 0.020
JUMLAH TENAGA KERJA
B BAHAN
- Dolken Kayu 8-10/400 cm Batang 1.250
- Semen Portland Kg 2.500
- Seng Gelombang Lbr 1.200
- Pasir Beton m3 0.005
- Koral Beton m3 0.009
- Kayu 5/7 m3 0.072
- Paku Biasa 2 - 5 cm Kg 0.060
- Meni Besi Liter 0.450
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 10 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.2.1.4. Pengukuran dan Pemasangan 1 m' Bouwplank

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.100
- Tukang Batu L.02 O/H 0.100
- Kepala Tukang Batu L.03 O/H 0.010
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Balok 5/7 ALBASIA m3 0.012
- Paku 2" - 3" Kg 0.020
- Kayu Papan 2/20 ALBASIA m3 0.007
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 10 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.2.1.6. (K3) Pembuatan 1m2 Rumah Jaga ( konstruksi kayu )
No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.000
- Tukang Kayu L.02 O/H 1.500
- Kepala Tukang L.03 O/H 0.150
- Mandor L.04 O/H 0.050
JUMLAH TENAGA KERJA
B BAHAN
- Dolken Kayu 8-10/400 cm Batang 3.000
- Kayu m3 0.276
- Paku Biasa Kg 0.700
- Seng Gelombang Kg 1.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.2.1.9. (K3) Pembersihan 1 m2 Lapangan dan Perataan

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.100
- Mandor L.04 O/H 0.050
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.2.2.1.13. Pembongkaran 1m3 Beton Bertulang

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 13.334
- Mandor L.04 O/H 0.666
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.2.1.14. Pembongkaran 1m3 Dinding Tembok Bata

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 6.667
- Mandor L.04 O/H 0.333
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.2.3.1. HARGA SATUAN PEKERJAAN TANAH

Jenis Pekerjaan : A.2.3.1.1. Penggalian 1m3 Tanah Biasa sedalam 1 m

No. Uraian Kode Satuan Koefisien


No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.750
- Mandor L.04 O/H 0.025
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 10 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Catt : Penambahan Galian /1m, koefisien pekerja ditambahkan 0.15, mandor 0.02
Jenis Pekerjaan : A.2.3.1.2. Penggalian 1m3 Tanah Biasa sedalam 2 m

No. Uraian Kode Satuan Koefisien

A TENAGA
- Tukang Gali L.01 O/H 0.900
- Mandor L.04 O/H 0.045
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.3.1.4. Penggalian 1m3 Tanah Keras sedalam 1 m

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.000
- Mandor L.04 O/H 0.032
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.3.1.5. Penggalian 1m3 Tanah Cadas sedalam 1 m

No. Uraian Kode Satuan Koefisien

1 UPAH
- Pekerja L.01 O/H 1.500
- Mandor L.04 O/H 0.060
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.3.1.6. Penggalian 1m3 Tanah Lumpur sedalam 1 m

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.200
- Mandor L.04 O/H 0.045
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.3.1.8. (K3) Pekerjaan Pembuangan 1m3 tanah sejauh 30 m'

No. Uraian Kode Satuan Koefisien

1 UPAH
- Pekerja L.01 O/H 0.330
- Mandor L.04 O/H 0.010
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.3.1.9. Pengurukan Kembali 1m3 Galian Tanah

No. Uraian Kode Satuan Koefisien

A TENAGA
- Tukang Gali L.01 O/H 0.500
- Mandor L.04 O/H 0.050
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.500
- Mandor L.04 O/H 0.050
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.3.1.11 Pengurukan 1m3 Dengan Pasir Urug

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.300
- Mandor L.04 O/H 0.010
JUMLAH TENAGA KERJA
B BAHAN
- Pasir Urug m3 1.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.3.1.14. Pengurukan 1m3 Sirtu Padat

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.250
- Mandor L.04 O/H 0.025
JUMLAH TENAGA KERJA
B BAHAN
- Sirtu m3 1.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI

Jenis Pekerjaan : A.3.2.1.2. Pemasangan 1m3 Pondasi Batu Belah Campuran 1SP : 4 PP

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.500
- Tukang Batu L.02 O/H 0.750
- Kepala Tukang Batu L.03 O/H 0.075
- Mandor L.04 O/H 0.075
JUMLAH TENAGA KERJA
B BAHAN
- Batu Belah m3 1.200
- Semen Portland ( 50 kg ) Kg 163.000
- Pasir Pasang m3 0.520
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.3.2.1.10. Pemasangan 1m3 Pondasi Siklop 60 % Beton Camp. 1:2:3 dan 40 % Batu Belah

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 3.400
- Tukang Batu L.02 O/H 0.850
- Kepala Tukang Batu L.03 O/H 0.085
- Mandor L.04 O/H 0.170
JUMLAH TENAGA KERJA
2 BAHAN
- Batu Belah m3 0.480
- Semen Portland ( 50 kg ) Kg 194.000
- Pasir Beton m3 0.312
- Kerikil m3 0.468
- Besi Beton (Besi Polos) Kg 126.000
- Kawat Beton Kg 1.800
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.4.1.1. HARGA SATUAN PEKERJAAN BETON

Jenis Pekerjaan : A.4.1.1.1. Membuat 1m3 Beton Mutu f'₀ = 7.4 Mpa (K-100), Slump (12 ± 2) cm, w/c = 0.87

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.650
- Tukang Batu L.02 O/H 0.275
- Kepala Tukang Batu L.03 O/H 0.028
- Mandor L.04 O/H 0.083
JUMLAH TENAGA KERJA
2 BAHAN
- Semen Portland Kg 247.000
- Pasir Beton m3 0.517
- Kerikil (maks = 30 mm) m3 0.740
- Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.1.1.2. Membuat 1m3 Beton Mutu f'₀ = 9.8 Mpa (K-125), Slump (12 ± 2) cm, w/c = 0.78

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.650
- Tukang Batu L.02 O/H 0.275
- Kepala Tukang Batu L.03 O/H 0.028
- Mandor L.04 O/H 0.083
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland Kg 276.000
- Pasir Beton m3 0.493
- Kerikil m3 0.750
- Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3 - 6) cm, w

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.200
- Tukang Batu L.02 O/H 0.200
- Kepala Tukang Batu L.03 O/H 0.020
- Mandor L.04 O/H 0.060
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland Kg 247.000
- Pasir Beton m3 0.517
- Kerikil m3 0.740
- Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.1.1.7. Membuat 1m3 Beton Mutu f'₀ = 19.3 Mpa (K-225), Slump (12 ± 2) cm, w/c = 0.5

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.650
- Tukang Batu L.02 O/H 0.275
- Kepala Tukang Batu L.03 O/H 0.028
- Mandor L.04 O/H 0.083
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland Sak 371.000
- Pasir Beton m3 0.415
- Kerikil m3 0.776
- Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : 4.1.1.19. Pemasangan 10 kg Jaring Kawat Baja ( Wiremesh ) M6

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.025
- Tukang Besi L.02 O/H 0.025
- Kepala Tukang Batu/Besi L.03 O/H 0.025
- Mandor L.04 O/H 0.001
JUMLAH TENAGA KERJA
B BAHAN
- Jaring Kawat Baja dilas Kg 10.200
- Kawat Beton Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 4.1.1.20. (K3) Pemasangan 1 m2 Beksting Pondasi


No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.520
- Tukang Kayu L.02 O/H 0.260
- Kepala Tukang L.03 O/H 0.026
- Mandor L.04 O/H 0.026
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.040
- Paku 5 " - 10" Kg 0.300
- Minyak Bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 4.1.1.21. (K3) Pemasangan 1 m2 Beksting Sloof

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.520
- Tukang Kayu L.02 O/H 0.260
- Kepala Tukang L.03 O/H 0.026
- Mandor L.04 O/H 0.026
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.045
- Paku 5 " - 10" Kg 0.300
- Minyak Bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 4.1.1.22. (K3) Pemasangan 1 m2 Bekisting Kolom

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.660
- Tukang Kayu L.02 O/H 0.330
- Kepala Tukang L.03 O/H 0.033
- Mandor L.04 O/H 0.033
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.040
- Paku 5 " - 10" Kg 0.400
- Minyak Bekisting Liter 0.200
- Balok Kayu Kls II m3 0.015
- Playwood tebal 9mm Lbr 0.350
- Dolken Kayu 8-10m Panj-4m btg 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 4.1.1.23. (K3) Pemasangan 1 m2 Bekisting Balok

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.660
- Tukang Kayu L.02 O/H 0.330
- Kepala Tukang L.03 O/H 0.033
- Mandor L.04 O/H 0.033
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.040
- Paku 5 " - 10" Kg 0.400
- Minyak Bekisting Liter 0.200
- Balok Kayu Kls II m3 0.018
- Playwood tebal 9mm Lbr 0.350
- Dolken Kayu 8-10m Panj-4m btg 2.000
JUMLAH HARGA
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 4.1.1.24. (K3) Pemasangan 1 m2 Bekisting untuk lantai

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.660
- Tukang Kayu L.02 O/H 0.330
- Kepala Tukang L.03 O/H 0.033
- Mandor L.04 O/H 0.033
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.040
- Paku 5 " - 10" Kg 0.400
- Minyak Bekisting Liter 0.200
- Balok Kayu Kls II m3 0.018
- Playwood tebal 9mm Lbr 0.350
- Dolken Kayu 8-10m Panj-4m btg 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 4.1.1.25. (K3) Pemasangan 1 m2 Bekisting Dinding

No. Uraian Kode Satuan Koefisien


A TENAGA
- Pekerja L.01 O/H 0.660
- Tukang Kayu L.02 O/H 0.330
- Kepala Tukang L.03 O/H 0.033
- Mandor L.04 O/H 0.033
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.040
- Paku 5 " - 10" Kg 0.400
- Minyak Bekisting Liter 0.200
- Balok Kayu Kls II m3 0.020
- Playwood tebal 9mm Lbr 0.350
- Dolken Kayu 8-10m Panj-4m btg 3.000
- Panjang jarak Bekisting/Spacer buah 4.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 4.1.1.35. Membuat 1 m' Kolom Praktis Bertulang (11 x 11) cm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.180
- Tukang Batu L.02 O/H 0.020
- Tukang Kayu L.02 O/H 0.020
- Tukang Besi L.02 O/H 0.020
- Kepala Tukang L.03 O/H 0.006
- Mandor L.04 O/H 0.009
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III (Papan) m3 0.002
- Paku 5 " - 10" Kg 0.010
- Minyak Bekisting Ltr 1.200
- Besi Beton Polos Kg 3.000
- Kawat Beton Kg 0.450
- Semen Portland Kg 4.000
- Pasir Beton m3 0.006
- Krikil m3 0.009
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 4.1.1.36. Membuat 1 m' Ring Balok Beton Bertulang (10 x 15) cm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.297
- Tukang Batu L.02 O/H 0.033
- Tukang Kayu L.02 O/H 0.033
- Tukang Besi L.02 O/H 0.033
- Kepala Tukang L.03 O/H 0.010
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III (Papan) m3 0.003
- Paku 5 " - 10" Kg 0.020
- Minyak Bekisting Ltr 1.200
- Besi Beton Polos Kg 3.600
- Kawat Beton Kg 0.050
- Semen Portland Kg 5.500
- Pasir Beton m3 0.009
- Krikil m3 0.015
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

Jenis Pekerjaan : 4.2.1.1. Pemasangan 1 Kg Besi Profil


No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.060
- Tukang Las L.02 O/H 0.060
- Kepala Tukang L.03 O/H 0.006
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KERJA
B BAHAN
- Besi Profil Kg 1.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 4.2.1.2. Pemasangan 1 Kg Rangka Kuda - Kuda Baja IWF

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.060
- Tukang Las L.02 O/H 0.060
- Kepala Tukang L.03 O/H 0.006
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KERJA
B BAHAN
- Besi Baja IWF Kg 1.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 4.2.1.24. 1 cm Pengelasan Dengan Las Listrik


No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.004
- Tukang L.02 O/H 0.002
- Kepala Tukang L.03 O/H 0.000
- Mandor L.04 O/H 0.000
JUMLAH TENAGA KERJA
B BAHAN
- Kawat las listrik kg 0.040
- Bahan bakar solar ltr 0.030
- Pelumas ltr 0.004
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING

Jenis Pekerjaan : A.4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22)cm, Tebal 1 Bata Campuran 1SP

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.600
- Tukang Batu L.02 O/H 0.200
- Kepala Tukang Batu L.03 O/H 0.020
- Mandor L.04 O/H 0.030
JUMLAH TENAGA KERJA
B BAHAN
- Bata Merah m2 140.000
- Semen Portland ( 50 kg ) Kg 43.500
- Pasir Pasang m3 0.080
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22)cm, Tebal 1 Bata Campuran 1SP

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.600
- Tukang Batu L.02 O/H 0.200
- Kepala Tukang Batu L.03 O/H 0.020
- Mandor L.04 O/H 0.030
JUMLAH TENAGA KERJA
B BAHAN
- Bata Merah buah 140.000
- Semen Portland ( 50 kg ) Kg 26.550
- Pasir Pasang m3 0.093
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.1.7. Pemasangan 1m2 dinding bata merah (5x11x22)cm, Tebal 1/2 Bata Campuran 1

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.100
- Kepala Tukang Batu L.03 O/H 0.010
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Bata Merah buah 70.000
- Semen Portland ( 50 kg ) Kg 18.950
- Pasir Pasang m3 0.038
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm, Tebal 1/2 Bata Campuran 1

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.100
- Kepala Tukang Batu L.03 O/H 0.010
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Bata Merah buah 70.000
- Semen Portland ( 50 kg ) Kg 14.370
- Pasir Pasang m3 0.040
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.1.9. Pemasangan 1m2 dinding bata merah (5x11x22)cm, Tebal 1/2 Bata Campuran 1

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.100
- Kepala Tukang Batu L.03 O/H 0.010
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Bata Merah buah 70.000
- Semen Portland ( 50 kg ) Kg 11.500
- Pasir Pasang m3 0.043
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN

Jenis Pekerjaan : A.4.4.2.2. Pemasangan 1m2 Plesteran 1SP : 2 PP Tebal 15 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.150
- Kepala Tukang Batu L.03 O/H 0.015
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland ( 50 kg ) Kg 10.224
- Pasir Pasang m3 0.020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.2.4. Pemasangan 1m2 Plesteran 1SP : 4 PP Tebal 15 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.150
- Kepala Tukang Batu L.03 O/H 0.015
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland ( 50 kg ) Kg 6.240
- Pasir Pasang m3 0.024
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.2.26. Pemasangan 1m2 Finishing Siar Pasangan Batu Kali Campuran 1SP : 2 PP

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.150
- Kepala Tukang Batu L.03 O/H 0.015
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland ( 50 kg ) Kg 6.340
- Pasir Pasang m3 0.012
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.2.27. Pemasangan 1m2 Acian

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.200
- Tukang Batu L.02 O/H 0.100
- Kepala Tukang Batu L.03 O/H 0.010
- Mandor L.04 O/H 0.010
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland ( 50 kg ) Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.2.28. Pemasangan 1m2 Plesteran Beton Campuran 1SP : 2 PP Tebal 15 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.260
- Tukang Batu L.02 O/H 0.200
- Kepala Tukang Batu L.03 O/H 0.020
- Mandor L.04 O/H 0.013
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland ( 50 kg ) Kg 8.300
- Pasir Pasang m3 0.018
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.3.58.Pemasangan 1 m2 dinding batu tempel hitam

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.700
- Tukang Batu L.02 O/H 0.350
- Kepala Tukang Batu L.03 O/H 0.035
- Mandor L.04 O/H 0.035
JUMLAH TENAGA KERJA
B BAHAN
- Batu temple hitam Bh 1.100
- Semen Portland ( 50 kg ) Sak 11.750
- Pasir Pasang m3 0.035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

Jenis Pekerjaan : A.4.5.2.44. Pemasangan 1m2 Atap Polycarbonate

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.120
- Tukang Kayu L.02 O/H 0.060
- Kepala Tukang L.03 O/H 0.006
- Mandor L.04 O/H 0.006
JUMLAH TENAGA KERJA
B BAHAN
- Atap Polycarbonate m2 1.000
- Paku skrup kg 0.346
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN


Jenis Pekerjaan : A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.250
- Tukang Cat L.02 O/H 0.225
- Kepala Tukang L.03 O/H 0.0225
- Mandor L.04 O/H 0.0075
JUMLAH TENAGA KERJA
B BAHAN
- Manie Besi Kg 0.100
- Pengencer Liter 0.010
- Kuwas Bh 0.010
- Perancah kayu M3 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.250
- Tukang Cat L.02 O/H 0.250
- Kepala Tukang L.03 O/H 0.025
- Mandor L.04 O/H 0.0013
JUMLAH TENAGA KERJA
B BAHAN
- Menie A Kg 0.100
- Menie B Kg 0.100
- Cat Kg 0.080
- Kuwas Bh 0.010
- Pengencer Ltr 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.7.1.19. Pengecatan 1m2 Permukaan Baja Galvanis Secara Manual sistem 1 Lapis Cat M

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.060
- Tukang Cat L.02 O/H 0.060
- Kepala Tukang L.03 O/H 0.012
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KERJA
B BAHAN
- Cat Kg 0.300
- Kuwas Bh 0.010
- Pengencer Ltr 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.8.4.1. HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG

Jenis Pekerjaan : A.8.4.1.3. (K3) Pemasangan 1m Pipa PVC Dia 110 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.105
- Tukang Pipa L.02 O/H 0.053
- Mandor L.04 O/H 0.011
JUMLAH TENAGA KERJA
B BAHAN
- Pipa PVC Dia 110 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripod/Tackel & Hari 0.010
Handle Crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.4. (K3) Pemasangan 1m Pipa PVC Dia 150 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.118
- Tukang Pipa L.02 O/H 0.059
- Mandor L.04 O/H 0.012
JUMLAH TENAGA KERJA
B BAHAN
- Pipa PVC Dia 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripod/Tackel & Hari 0.012
Handle Crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.5. (K3) Pemasangan 1m Pipa PVC Dia 200 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.189
- Tukang Pipa L.02 O/H 0.095
- Mandor L.04 O/H 0.019
JUMLAH TENAGA KERJA
B BAHAN
- Pipa PVC Dia 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripod/Tackel & Hari 0.024
Handle Crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.6. (K3) Pemasangan 1m Pipa PVC Dia 250 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.256
- Tukang Pipa L.02 O/H 0.128
- Mandor L.04 O/H 0.026
JUMLAH TENAGA KERJA
B BAHAN
- Pipa PVC Dia 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripod/Tackel & Hari 0.034
Handle Crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.7. (K3) Pemasangan 1m Pipa PVC Dia 300 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.294
- Tukang Pipa L.02 O/H 0.147
- Mandor L.04 O/H 0.029
JUMLAH TENAGA KERJA
B BAHAN
- Pipa PVC Dia 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripod/Tackel & Hari 0.040
Handle Crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.34. (K3) Pemasangan 1 m Pipa GIP Ø 100 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.400
- Tukang Pipa L.02 O/H 0.200
- Mandor L.04 O/H 0.040
JUMLAH TENAGA KERJA
B BAHAN
- Pipa GIP Dia 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.36. (K3) Pemasangan 1 m Pipa GIP Ø 150 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.506
- Tukang Pipa L.02 O/H 0.253
- Mandor L.04 O/H 0.051
JUMLAH TENAGA KERJA
B BAHAN
- Pipa GIP Dia 150 mm m
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.37. (K3) Pemasangan 1 m Pipa GIP Ø 200 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.796
- Tukang Pipa L.02 O/H 0.398
- Mandor L.04 O/H 0.080
JUMLAH TENAGA KERJA
B BAHAN
- Pipa GIP Dia 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.38. (K3) Pemasangan 1 m Pipa GIP Ø 250 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.949
- Tukang Pipa L.02 O/H 0.475
- Mandor L.04 O/H 0.095
JUMLAH TENAGA KERJA
B BAHAN
- Pipa GIP Dia 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.39. (K3) Pemasangan 1 m Pipa GIP Ø 300 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.958
- Tukang Pipa L.02 O/H 0.479
- Mandor L.04 O/H 0.096
JUMLAH TENAGA KERJA
B BAHAN
- Pipa GIP Dia 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.65. (K3) Pemasangan 1 m Pipa Baja Ø 100 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.579
- Tukang Pipa L.02 O/H 0.116
- Mandor L.04 O/H 0.058
JUMLAH TENAGA KERJA
B BAHAN
- Pipa Baja Æ 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel dan Handle Hari 0.004
Crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.67. (K3) Pemasangan 1 m Pipa Baja Ø 150 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.708
- Tukang Pipa L.02 O/H 0.142
- Mandor L.04 O/H 0.071
JUMLAH TENAGA KERJA
B BAHAN
- Pipa Baja Æ 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel dan Handle Hari 0.004
Crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.1.68. (K3) Pemasangan 1 m Pipa Baja Ø 200 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.113
- Tukang Pipa L.02 O/H 0.223
- Mandor L.04 O/H 0.111
JUMLAH TENAGA KERJA
B BAHAN
- Pipa Baja Æ 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel dan Handle Hari 0.004
Crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.8.4.3. HARGA SATUAN PEKERJAAN PEMASANGAN ACCESSORIES PIPA

Jenis Pekerjaan : A.8.4.3.1. (K3) Pemasangan 1 buah Valve dia 100 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.429
- Tukang Pipa L.02 O/H 0.715
- Mandor L.04 O/H 0.143
JUMLAH TENAGA KERJA
B BAHAN
- Gate Valve dia 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel & Hari 0.100
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.3.2. (K3) Pemasangan 1 buah Valve dia 200 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.714
- Tukang Pipa L.02 O/H 0.857
- Mandor L.04 O/H 0.171
JUMLAH TENAGA KERJA
B BAHAN
- Gate Valve dia 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel & Hari 0.300
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.3.15. (K3) Pemasangan 1 buah Tee dia 100 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.106
- Tukang Pipa L.02 O/H 0.053
- Mandor L.04 O/H 0.011
JUMLAH TENAGA KERJA
B BAHAN
- Tee dia 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel & Hari 0.028
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.3.16. (K3) Pemasangan 1 buah Tee dia 200 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.216
- Tukang Pipa L.02 O/H 0.108
- Mandor L.04 O/H 0.022
JUMLAH TENAGA KERJA
B BAHAN
- Tee dia 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel & Hari 0.029
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

A.8.4.5. HARGA SATUAN PEKERJAAN PENGETESAN PIPA


Jenis Pekerjaan : A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.0080
- Mandor L.04 O/H 0.0008
JUMLAH TENAGA KERJA
B BAHAN
- Air test (air bersih) m3 0.0177
- Bahan bakar Liter 0.0600
- Oli Liter 0.0020
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.0080
- Mandor L.04 O/H 0.0008
JUMLAH TENAGA KERJA
B BAHAN
- Air test (air bersih) m3 0.0314
- Bahan bakar Liter 0.0600
- Oli Liter 0.0020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.5.6 (K3) Pemasangan Box Curvert (BC 1x1 meter) saluran tertutup

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.2000
- Tukang L.02 O/H 0.0700
- Kepala Tukang L.03 O/H 0.0200
- Mandor L.04 O/H 0.0150
JUMLAH TENAGA KERJA
B BAHAN
- Box Curvert Buah 1.0000
JUMLAH HARGA BAHAN
C PERALATAN
- Escavator 80-140 HP jam 0.531
PC 100 JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.2.3.1.11.(K3) Pengurugan 1 m3 Dengan Pasir Urug

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.0080
- Mandor L.04 O/H 0.0008
JUMLAH TENAGA KERJA
B BAHAN
- Pasir Urug m3 0.0780

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.5.6 (K3) Pemasangan Uditch 1 X 1 Meter saluran tertutup

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.2000
- Tukang L.02 O/H 0.0700
- Kepala Tukang L.03 O/H 0.0200
- Mandor L.04 O/H 0.0150

JUMLAH TENAGA KERJA


B BAHAN
- Pasir Urug m3 0.0780
- Uditch 1 x 1 meter Buah 1.0200

JUMLAH HARGA BAHAN


C PERALATAN
- Escavator 80-140 HP jam 0,5305
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : Membuat 1m2 bar Screen /Saringan Kasar konvensional

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.750
- Tukang Batu L.02 O/H 0.250
- Kepala Tukang Batu L.03 O/H 0.025
- Mandor L.04 O/H 0.075
JUMLAH TENAGA KERJA
B BAHAN
- Besi Beton dia 12 mm m 30
- Baja Profil L 40 . 40 . 4 m 4
- Dynabolt/Rammset dia 8 mm buah 21
tiap 20 cm
JUMLAH HARGA BAHAN
C PERALATAN
- Alat las listrik/Diesel E22 SEWA 0.150
- Bor Listrik TO.03 SEHARI 0.020
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.1.1.8. Membuat 1m3 Beton Mutu f'₀ = 21,7 Mpa (K-250) Kedap Air, Slump (12 ± 2) cm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 1.650
- Tukang Batu L.02 O/H 0.275
- Kepala Tukang Batu L.03 O/H 0.028
- Mandor L.04 O/H 1.650
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland M.15 kg 384
- Pasir Beton M.14.a kg 692
- Kerikil M.12 kg 1,039
- Air M.02 liter 215
JUMLAH HARGA BAHAN
C PERALATAN
- Molen kap. 0,3 m3 E.29.b sewa/hari 0,250
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 1 Kg Pembesian besi tulangan O 12

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.0070
- Tukang Besi L.02 O/H 0.0070
- Kepala Tukang Besi L.03 O/H 0.0007
- Mandor L.04 O/H 0.0004
JUMLAH TENAGA KERJA
B BAHAN
- Besi Beton(Polos/Ulir) M.55.d kg 1.05
- kawat Ikat M.67 kg 0.0150

JUMLAH HARGA BAHAN


C PERALATAN
-
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : 1m2 Bekisting Pondasi Dan Sloof Beton Biasa Dengan Menggunakan Papan 3x20 cm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0,300
- Tukang Batu L.02 O/H 0,150
- Kepala Tukang Batu L.03 O/H 0,015
- Mandor L.04 O/H 0,030
JUMLAH TENAGA KERJA
B BAHAN
- papan 3x20cm kayu klas 11 M.35.e lbr 0,014
- kaso 5/7 M.37.a m3 0,009
- Paku 5cm dan Paku 7cm M.71.b kg 0,3
- Minyak Bekisting M.129 L 0,2
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : Bongkar 1m2 Bekisting Secara Biasa(membersihkan dan membereskan puing-puing)

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0,040
- Mandor L.04 O/H 0,004
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : Pengecatan 1m2 Permukaan baja Galvanis Secara Manual Sistim 1 lapis cat Mutakhir unt

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0,06
- Tukang Cat L.02 O/H 0,06
- Kepala Tukang L.03 O/H 0,012
- Mandor L.04 O/H 0,003
JUMLAH TENAGA KERJA
B BAHAN - Cat Kg 0,30
- kwas buah 0,01
- Pengencer L 0,01
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : Pemasangan pipa Galvanis Diameter 2'' untuk reling Jalan Setapak

No. Uraian Kode Satuan Koefisien


No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0,135
- Tukang Besi L.02 O/H
- Kepala Tukang L.03 O/H
- Mandor L.04 O/H
JUMLAH TENAGA KERJA
B BAHAN - Pipa Galvanis dia 2'' M 1,20
- Perlengkapan % 35,00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : Pemasangan pipa Galvanis Diameter 2'' untuk reling Jalan Setapak

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0,135
- Tukang Besi L.02 O/H
- Kepala Tukang L.03 O/H
- Mandor L.04 O/H
JUMLAH TENAGA KERJA
B BAHAN - Pipa Galvanis dia 2'' M 1,20
- Perlengkapan % 35,00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.2.1.1.(K3) Pemasangan 1kg besi profil (UNP 200) Grill saluran

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.0600
- Tukang las Konstruksi L.03 O/H 0.0600
- Kepala Tukang L.03 O/H 0.0060
- Mandor L.04 O/H 0.0030
JUMLAH TENAGA KERJA
B BAHAN
- baja UNP 200 m3 1.0000

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.2.1.3.Pengerjaan 100 kg Pekerjaan Perakitan

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.1000
- Tukang las Konstruksi L.03 O/H 0.1000
- Kepala Tukang L.03 O/H 0.0010
- Mandor L.04 O/H 0.0050
JUMLAH TENAGA KERJA
B BAHAN
- Solar Liter 1.0000
- Minyak Pelumas Liter 0.1000

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.2.1.5.Pengerjaan 10 cm Pengelasan Dengan Las Listrik

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.0400
- Tukang las Konstruksi L.03 O/H 0.0200
- Kepala Tukang L.03 O/H 0.0020
- Mandor L.04 O/H 0.0020
JUMLAH TENAGA KERJA
B BAHAN
- Kawat Las Listrik Liter 0.4000
- Solar Liter 0.3000
- Minyak Pelumas Liter 0.0400
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Alat jam 0.170
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Pekerjaan : 1m3 Urugan Pasir dengan Tenaga

Uraian Kode Satuan Koefisien

TENAGA
- Pekerja L.01 O/H 0.0400
- Mandor L.04 O/H 0.0020
JUMLAH TENAGA KERJA
BAHAN
- Pasir Urug m3 0.4000
JUMLAH HARGA BAHAN
PERALATAN
Sewa Alat jam 0.170
JUMLAH HARGA ALAT

Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D) 10%
Harga Satuan Pekerjaan (D + E)

Pekerjaan : A.4.1.1.7. Membuat 1m3 Beton Mutu f'₀ = 31,2 Mpa (K-350) Kedap Air, Slump (12 ± 2) cm

Uraian Kode Satuan Koefisien

TENAGA
- Pekerja L.01 O/H 2.100
- Tukang Batu L.02 O/H 0.350
- Kepala Tukang Batu L.03 O/H 0.035
- Mandor L.04 O/H 0.210
JUMLAH TENAGA KERJA
BAHAN
- Semen Portland Kg 448.000
- Pasir Beton m3 0.667
- Kerikil m3 1.000
- Air Liter 215.000
JUMLAH HARGA BAHAN
PERALATAN

JUMLAH HARGA ALAT

Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D) 10%
Harga Satuan Pekerjaan (D + E)

Pekerjaan : 4.1.1.25. (K3) Pemasangan 1 m2 Bekisting Dinding Beton Saluran

Uraian Kode Satuan Koefisien

TENAGA
- Pekerja L.01 O/H 0.660
- Tukang Kayu L.02 O/H 0.330
- Kepala Tukang L.03 O/H 0.033
- Mandor L.04 O/H 0.033
JUMLAH TENAGA KERJA
BAHAN
- Multiflex 18 mm M.39.d lbr 0.128
- kaso 5,7 M.37.a m3 0.007
- Paku 5cm dan Paku 7cm M.71.b kg 0.30
- Minyak Bekisting M.129 L 0.20
JUMLAH HARGA BAHAN
PERALATAN

JUMLAH HARGA ALAT

Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D) 10%

Jenis Pekerjaan : 4.1.1.19. Pemasangan 10 kg Jaring Kawat Baja ( Wiremesh ) M12

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.025
- Tukang Besi L.02 O/H 0.025
- Kepala Tukang Batu/Besi L.03 O/H 0.025
- Mandor L.04 O/H 0.001
JUMLAH TENAGA KERJA
B BAHAN
- Jaring Kawat Baja dilas Kg 10.200
- Kawat Beton Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.2.1.11. Pemasangan 1m kusen pintu almunium 3"

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.043
- Tukang Khusus alm L.03 O/H 0.043
- Kepala Tukang Batu/Besi L.03 O/H 0.043
- Mandor L.04 O/H 0.021
JUMLAH TENAGA KERJA
B BAHAN
- profil almunium Kg 10.200
- sekruf fisher Kg 0.050
- sealent tube 0.060
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.2.1.13. Pemasangan 1m2 pintu kaca rangka almunium

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.043
- Tukang alm/kaca L.03 O/H 0.043
- Kepala Tukang Batu/Besi L.03 O/H 0.043
- Mandor L.04 O/H 0.021
JUMLAH TENAGA KERJA
B BAHAN
- pintu almunium m 4.400
- kaca m 4.500
- sealent tube 0.270
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 40cmx40cm


No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.700
- Tukang batu L.02 O/H 0.350
- Kepala Tukang Batu/Besi L.03 O/H 0.035
- Mandor L.04 O/H 0.035
JUMLAH TENAGA KERJA
B BAHAN
- keramik 40x40 bh 6.630
- semen portland kg 9.800
- semen warna kg 0.600
- pasir pasang m3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.3.36. Pemasangan 1m2 lantai keramik uk 20cmx20cm kamar mandi

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.700
- Tukang batu L.02 O/H 0.350
- Kepala Tukang Batu/Besi L.03 O/H 0.035
- Mandor L.04 O/H 0.035
JUMLAH TENAGA KERJA
B BAHAN
- keramik 20x20 doos 1.050
- semen portland kg 10.400
- semen warna kg 1.000
- pasir pasang m3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.3.54. Pemasangan 1m2 dinding keramik uk 20cmx25cm kamar mandi

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.900
- Tukang batu L.02 O/H 0.450
- Kepala Tukang Batu/Besi L.03 O/H 0.045
- Mandor L.04 O/H 0.045
JUMLAH TENAGA KERJA
B BAHAN
- keramik 20x20 buah 20.000
- semen portland kg 9.300
- semen warna kg 1.940
- pasir pasang m3 0.018
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.3.39. Pemasangan 1m1 plin keramik uk 10cm x 40cm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.090
- Tukang batu L.02 O/H 0.090
- Kepala Tukang Batu L.03 O/H 0.035
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- plin 10x40 buah 2.50
- semen portland kg 1.140
- semen warna kg 0.025
- pasir pasang m3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.4.3.64. Pemasangan 1m2 Paving Block natural t= 6cm carport

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.250
- Tukang batu L.02 O/H 0.500
- Kepala Tukang Batu/Besi L.03 O/H 0.050
- Mandor L.04 O/H 0.001
JUMLAH TENAGA KERJA
B BAHAN
- paving block 6cm m2 1.010
- pasir beton m3 0.050
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.5.1.7. Pemasangan 1m2 langit langit gypsum board t=9mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.100
- Tukang kayu L.02 O/H 0.050
- Kepala Tukang kayu L.03 O/H 0.005
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- gypsum board 9mm m2 0.364
- paku skrup kg 0.110
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.5.2.32. Pemasangan 1m2 genteng metal 80x100 atap pelana

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.200
- Tukang kayu L.02 O/H 0.100
- Kepala Tukang kayu L.03 O/H 0.010
- Mandor L.04 O/H 0.001
JUMLAH TENAGA KERJA
B BAHAN
- genteng metal buah 1.30
- paku biasa 1/2 - 1'' kg 0.20
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.5.2.37. Pemasangan 1 m1 nok genteng metal 80x100 atap pelana

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.250
- Tukang kayu L.02 O/H 0.150
- Kepala Tukang kayu L.03 O/H 0.015
- Mandor L.04 O/H 0.013
JUMLAH TENAGA KERJA
B BAHAN
- nok genteng metal buah 1.10
- paku biasa 1/2 - 1'' kg 0.50
-
-
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.5.2.43. Pemasangan 1 m2 almunium foil

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.150
- Tukang kayu L.02 O/H 0.050
- Kepala Tukang kayu L.03 O/H 0.005
- Mandor L.04 O/H 0.008
JUMLAH TENAGA KERJA
B BAHAN
- almunum foil m2 1.05
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.7.1.10. Pengecatan 1 m2 tembok terbaru 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat pe

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.200
- Tukang kayu L.02 O/H 0.063
- Kepala Tukang kayu L.03 O/H 0.0063
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KERJA
B BAHAN
- plamur kg 0.10
- cat dasar kg 0.10
- cat penutup kg 0.260
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.5.1.1.14. Pemasangan 1 buah floor drain

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.010
- Tukang batu L.02 O/H 0.010
- Kepala Tukang batu L.03 O/H 0.010
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- floor drain unit 1.00
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.5.1.1.17. Pemasangan 1 buah bak kontrol uk 60x60 tinggi 65 cm

No. Uraian Kode Satuan Koefisien


A TENAGA
- Pekerja L.01 O/H 3.200
- Tukang batu L.02 O/H 1.150
- Kepala Tukang batu L.03 O/H 0.011
- Mandor L.04 O/H 0.016
JUMLAH TENAGA KERJA
B BAHAN
- bata merah buah 123.00
- semen portland kg 114.00
- pasir pasang m3 0.184
- pasir beton m3 0.12
- kerikil m3 0.033
- baja tulangan kg 4.850
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.5.1.1.19. Pemasangan 1 buah kran 1/2 '' atau 3/4

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.010
- Tukang batu L.02 O/H 0.400
- Kepala Tukang batu L.03 O/H 0.040
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- kran air m 1.00
- sealtape buah 0.025
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.5.1.1.25. Pemasangan 1 m1 pipa pvc type AW diameter 1/2''

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang pasang pipa L.01 O/H 0.010
- L.02 O/H 0.400
- L.03 O/H 0.040
- L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- pipa pvc 1/2'' m 1.20
- perlengkapan % 35,00
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.5.1.1.26. Pemasangan 1 m1 pipa pvc type AW diameter 3/4''

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang pasang pipa L.01 O/H 0.036
-
-
-
JUMLAH TENAGA KERJA
B BAHAN
- pipa pvc 3/4'' m 1.20
- perlengkapan % 35,00
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.5.1.1.31. Pemasangan 1 m1 pipa pvc type AW diameter 3''

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang pasang pipa L.01 O/H 0.081
-
-
-
JUMLAH TENAGA KERJA
B BAHAN
- pipa pvc 3'' m 1.20
- perlengkapan % 35,00
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.5.1.1.32. Pemasangan 1 m1 pipa pvc type AW diameter 4''

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang pasang pipa L.01 O/H 0.081
-
-
-
JUMLAH TENAGA KERJA
B BAHAN
- pipa pvc 3'' m 1.20
- perlengkapan % 35,00
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.5.1.1.. Pemasangan 1 buah closet duduk/monoblock

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 3.30
- Tukang batu L.02 O/H 1.10
- Kepala Tukang batu L.03 O/H 0.01
- Mandor L.04 O/H 0.16
JUMLAH TENAGA KERJA
B BAHAN
- closet duduk unit 1.00
- perlengkapan ls 6%xcloset
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. Pemasangan 1 buah titik lampu

No. Uraian Kode Satuan Koefisien

A TENAGA
upah % 100.00

JUMLAH TENAGA KERJA


B BAHAN
- pipa listrik 5/8'' btng
- kabel m
- T dus buah
- L Bow buah
- Las dop buah
- klem buah
- mongkok buah
- saklar buah
- fitting buah
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.2.1.21. Pemasangan 1 m2 rangka bes1 hollow 4x4x2 modul 60x60 untuk plafond

No. Uraian Kode Satuan Koefisien

A TENAGA

- Tukang besi L.02 O/H 0.350


- Kepala Tukang besi L.03 O/H 0.035
- Mandor L.04 O/H 0.018
JUMLAH TENAGA KERJA
B BAHAN
- rangka metal hollo 4.4.2 mm m 4.000
- acsesoris,perkuuatan las Ls 100%xrangka
dll
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


0.150
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.2.1.22. Pemasangan 1 m2 rangka atap pelana baja canai dingin profil C 75

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.734
- Tukang besi L.02 O/H 0.734
- Kepala Tukang besi L.03 O/H 0.073
- Mandor L.04 O/H 0.037
JUMLAH TENAGA KERJA
B BAHAN
- Baja ringan canai dingin c75 kg 3.065
-

JUMLAH HARGA BAHAN


C PERALATAN % 10

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. Pemasangan 1 buah MCB

No. Uraian Kode Satuan Koefisien

A TENAGA

upah % 100.00

JUMLAH TENAGA KERJA


B BAHAN
- pipa listrik 5/8'' btng 3.00
- kabel m 15.00
- T dus buah 1.00
- L Bow buah 2.00
- klem biasa buah 24.000
- MCB buah 1.00
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. Pemasangan 1 Titik stop kontak

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750

JUMLAH TENAGA KERJA


B BAHAN
- stop kontak buah 1.000
- Kabel NYM 2X2.5 mm m1 12.0000
- pipa conduit pvc 20 mm2 m 12.0000
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. Pemasangan 1 Titik exaust fan

No. Uraian Kode Satuan Koefisien


A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750

JUMLAH TENAGA KERJA


B BAHAN
- exaust fan buah 1.000
-
-
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. Pemasangan 1 Titik down light 4''

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750

JUMLAH TENAGA KERJA


B BAHAN
- down light 4'' buah 1.000
-
-
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. Pemasangan 1 Titik down light 3''

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750

JUMLAH TENAGA KERJA


B BAHAN
- down light 3'' buah 1.000
-
-
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. Pemasangan 1 Titik lampu dinding

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750

JUMLAH TENAGA KERJA


B BAHAN
- lampu dinding buah 1.000
-
-
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)

Jenis Pekerjaan : A.8.4.6.1. Pemasangan 1 Titik lampu beton exposed

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750

JUMLAH TENAGA KERJA


B BAHAN
- lampu beton exposed buah 1.000
-
-
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. Pemasangan 1 Titik saklar tunggal

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750

JUMLAH TENAGA KERJA


B BAHAN
- saklar tunggal buah 1.000
- inbowdooseng 1.000
-
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. Pemasangan 1 Titik saklar ganda

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750
JUMLAH TENAGA KERJA
B BAHAN
- saklar ganda buah 1.000
- inbowdooseng 1.000
-
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. Pembuatan 1 unit sumur resapan

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang batu OH 2.00
- kepala tukang batu OH 0.20
- pekerja OH 1.00
- mandor OH 0.10
JUMLAH TENAGA KERJA
B BAHAN
- galian lebih dari 3m m3 5.8483
- urugan tanah m3 4.6935
- buis beton 800 buah 14.000
- batu koral m3 0.3462
- beton tebal 50mm m3 0.0080
- plat beton penutup t=100 mm m3 0.1005
- ijuk bdl 20.0000
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.8.4.6.1. pemasangan 1m1 kabel NYM 3X2.5 MM2

No. Uraian Kode Satuan Koefisien

A TENAGA
- tukang listrik OH 0.1000
- pekerja OH 0.1500
- mandor OH 0.0500
-
JUMLAH TENAGA KERJA
B BAHAN
- kabel NYM 3X2.5 mm 1.0000
-
-
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.5.1.1.31. Pemasangan 1 M2 kaca polos 5mm

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.015
- Tukang kayu L.02 O/H 0.150
- Kepala Tukang kayu L.03 O/H 0.015
- Mandor L.04 O/H 0.0008
JUMLAH TENAGA KERJA
B BAHAN
- kaca tebal 5mm m 1.10
- sealent kg 0.050
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.3.2.1.9. Pemasangan 1 m3 batu kosong anstamping

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.780
- Tukang batu L.02 O/H 0.390
- Kepala Tukang batu L.03 O/H 0.039
- Mandor L.04 O/H 0.039
JUMLAH TENAGA KERJA
B BAHAN
- batu belah m3 1.20
- pasir urug m3 0.432
-
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.4.5.2.44. Pemasangan 1m2 Atap Polycarbonate

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.120
- Tukang Kayu L.02 O/H 0.060
- Kepala Tukang L.03 O/H 0.006
- Mandor L.04 O/H 0.006
JUMLAH TENAGA KERJA
B BAHAN
- Atap Polycarbonate m2 1.000
- Paku skrup kg 0.346
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : pemasangan lantai bondeck m2

No. Uraian Kode Satuan Koefisien

A TENAGA
- bongkar bekisting plat lantai OH 0.5000
- pek.pengecoran plat OH 0.1250
- pek.penulangan OH 6.0420
- pek.pemasangan bondeck 1.00
JUMLAH TENAGA KERJA
B BAHAN
- beton k-225 m3 0.125
- kayu borneo super m3 0.003
- bondeck t= 0.75 1000 mm m2 1.00
- endstop m3 0.500
- wiremesh m6 lbr 0.008
- besi beton kg 2.23
- bahan paku dan mur kg 0.100
paku1 -3cm
-
JUMLAH HARGA BAHAN
C PERALATAN
- scafolding m2 1,000
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
Jenis Pekerjaan : A.4.5.1.7. Pemasangan 1m2 plafond gypsum 9 mm jaya board

No. Uraian Kode Satuan Koefisien

A TENAGA

- Tukang kayu L.02 O/H 0.200


- Kepala Tukang kayu L.03 O/H 0.020
- Mandor L.04 O/H 0.030
JUMLAH TENAGA KERJA
B BAHAN
- gypsum board 9mm lembar 0.364
- paku/skrup Kg 0.110

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
KERJAAN
8/PRT/M/2016

Kayu Setinggi 2 m
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 63,057.20
166,729.00 33,345.80
5.00 0.10
194,274.00 3,885.48
MLAH TENAGA KERJA 100,288.58

26,400.00 33,000.00
1,120.00 5,600.00
220,000.00 1,100.00
220,000.00 1,980.00
4,125,000.00 297,000.00
31,900.00 1,914.00
1,250.00 500.00
MLAH HARGA BAHAN 341,094.00

MLAH HARGA ALAT

441,382.58
44,138.26
485,520.84

ri Seng Setinggi 2 m
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 63,057.20
166,729.00 33,345.80
5.00 0.10
194,274.00 3,885.48
MLAH TENAGA KERJA 100,288.58
26,400.00 33,000.00
1,120.00 2,800.00
27,500.00 33,000.00
220,000.00 1,100.00
220,000.00 1,980.00
4,125,000.00 297,000.00
31,900.00 1,914.00
24,200.00 10,890.00
MLAH HARGA BAHAN 381,684.00

MLAH HARGA ALAT

481,972.58
48,197.26
530,169.84

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 15,764.30
166,729.00 16,672.90
182,676.00 1,826.76
194,274.00 971.37
MLAH TENAGA KERJA 35,235.33

1,650,000.00 19,800.00
27,000.00 540.00
1,093,750.00 7,656.25
MLAH HARGA BAHAN 27,996.25

MLAH HARGA ALAT

63,231.58
6,323.16
69,554.74

ruksi kayu )
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 157,643.00
166,729.00 250,093.50
5.00 0.75
194,274.00 9,713.70
MLAH TENAGA KERJA 417,450.95

26,400.00 79,200.00
4,125,000.00 1,138,500.00
19,250.00 13,475.00
69,250.00 103,875.00
MLAH HARGA BAHAN 1,335,050.00

MLAH HARGA ALAT

1,752,500.95
175,250.10
1,927,751.05

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 15,764.30
194,274.00 9,713.70
MLAH TENAGA KERJA 25,478.00

MLAH HARGA BAHAN

MLAH HARGA ALAT

25,478.00
2,547.80
28,025.80
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 2,102,012
194,274.00 129,386
MLAH TENAGA KERJA 2,231,398

MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT

2,231,398
223,140
2,454,538

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 1,051,005.88
194,274.00 64,693.24
MLAH TENAGA KERJA 1,115,699.12

MLAH HARGA BAHAN

MLAH HARGA ALAT

1,115,699.12
111,569.91
1,227,269.04

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 118,232.25
194,274.00 4,856.85
MLAH TENAGA KERJA 123,089.10

MLAH HARGA BAHAN

MLAH HARGA ALAT

123,089.10
12,308.91
135,398.01 2 270,796.02

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

166,729.00 150,056.10
194,274.00 8,742.33
MLAH TENAGA KERJA 158,798.43

MLAH HARGA BAHAN

MLAH HARGA ALAT

158,798.43
15,879.84
174,678.27

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 157,643.00
194,274.00 6,216.77
MLAH TENAGA KERJA 163,859.77

MLAH HARGA BAHAN

MLAH HARGA ALAT

163,859.77
16,385.98
180,245.74

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 236,464.50
194,274.00 11,656.44
MLAH TENAGA KERJA 248,120.94

MLAH HARGA BAHAN

MLAH HARGA ALAT

248,120.94
24,812.09
272,933.03

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 189,171.60
194,274.00 8,742.33
MLAH TENAGA KERJA 197,913.93
MLAH HARGA BAHAN

MLAH HARGA ALAT

197,913.93
19,791.39
217,705.32

ejauh 30 m'
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 52,022.19
194,274.00 1,942.74
MLAH TENAGA KERJA 53,964.93

MLAH HARGA BAHAN

MLAH HARGA ALAT

53,964.93
5,396.49
59,361.42

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

166,729.00 83,364.50
194,274.00 9,713.70
MLAH TENAGA KERJA 93,078.20

MLAH HARGA BAHAN

MLAH HARGA ALAT


93,078.20
9,307.82
102,386.02

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 78,821.50
194,274.00 9,713.70
MLAH TENAGA KERJA 88,535.20

MLAH HARGA BAHAN

MLAH HARGA ALAT

88,535.20
8,853.52
97,388.72

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 47,292.90
194,274.00 1,942.74
MLAH TENAGA KERJA 49,235.64

100,000.00 120,000.00
MLAH HARGA BAHAN 120,000.00

MLAH HARGA ALAT

169,235.64
16,923.56
186,159.20
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 39,410.75
194,274.00 4,856.85
MLAH TENAGA KERJA 44,267.60

148,000.00 177,600.00
MLAH HARGA BAHAN 177,600.00

MLAH HARGA ALAT

221,867.60
22,186.76
244,054.36

mpuran 1SP : 4 PP
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 236,464.50
0.00 0.00
5.00 0.38
194,274.00 14,570.55
MLAH TENAGA KERJA 251,035.43

100,000.00 120,000.00
1,120.00 182,560.00
185,000.00 96,200.00
MLAH HARGA BAHAN 398,760.00

MLAH HARGA ALAT

649,795.43
64,979.54
714,774.97

eton Camp. 1:2:3 dan 40 % Batu Belah


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 535,986.20
0.00 0.00
5.00 0.43
194,274.00 33,026.58
MLAH TENAGA KERJA 569,013.21

100,000.00 48,000.00
1,120.00 217,280.00
185,000.00 57,720.00
194,250.00 90,909.00
13,000.00 1,638,000.00
16,000.00 28,800.00
MLAH HARGA BAHAN 2,080,709.00

MLAH HARGA ALAT

2,649,722.21
264,972.22
2,914,694.43

(K-100), Slump (12 ± 2) cm, w/c = 0.87 lantai kerja


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 260,110.95
0.00 0.00
5.00 0.14
194,274.00 16,124.74
MLAH TENAGA KERJA 276,235.83
1,120.00 276,640.00
235,000.00 121,556.55
162,750.00 120,435.00
125.00 26,875.00
MLAH HARGA BAHAN 545,506.55

MLAH HARGA ALAT

821,742.38
82,174.24
903,916.62

(K-125), Slump (12 ± 2) cm, w/c = 0.78


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 260,110.95
0.00 0.00
5.00 0.14
194,274.00 16,124.74
MLAH TENAGA KERJA 276,235.83

1,120.00 309,120.00
235,000.00 115,821.43
194,250.00 145,615.56
125.00 26,875.00
MLAH HARGA BAHAN 597,431.98

MLAH HARGA ALAT

873,667.82
131,050.17
1,004,717.99

= 7,4 MPa (K 100), slump (3 - 6) cm, w/c = 0,87


Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 189,171.60
166,729.00 33,345.80
182,676.00 3,653.52
194,274.00 11,656.44
MLAH TENAGA KERJA 237,827.36

1,500.00 370,500.00
312,000.00 161,385.71
237,000.00 175,380.00
0.00
MLAH HARGA BAHAN 707,265.71

MLAH HARGA ALAT

945,093.07
94,509.31
1,039,602.38

a (K-225), Slump (12 ± 2) cm, w/c = 0.58 (PC:Ps:Kr=1:2:3)


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 260,110.95
166,729.00 45,850.48
182,676.00 5,114.93
194,274.00 16,124.74
MLAH TENAGA KERJA 327,201.10

1,360.00 504,560.00 holcim 50 68,000.00


135,000.00 56,089.29 cimalaka
260,000.00 201,644.44
125.00 26,875.00
MLAH HARGA BAHAN 789,168.73

MLAH HARGA ALAT

1,116,369.83
111,636.98
1,228,006.81
remesh ) M6
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 3,941.08
166,729.00 4,168.23
182,676.00 4,566.90
194,274.00 194.27
MLAH TENAGA KERJA 12,870.47

27,514.00 280,642.80
21,000.00 1,050.00
MLAH HARGA BAHAN 281,692.80

MLAH HARGA ALAT

294,563.27
29,456.33
324,019.60
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 81,974.36
166,729.00 43,349.54
182,676.00 4,749.58
194,274.00 5,051.12
MLAH TENAGA KERJA 135,124.60

15,500.00 620.00
19,250.00 5,775.00 1
15,600.00 1,560.00
MLAH HARGA BAHAN 7,955.00

MLAH HARGA ALAT

143,079.60
14,307.96
157,387.56

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 81,974.36
166,729.00 43,349.54
194,274.00 5,051.12
194,274.00 5,051.12
MLAH TENAGA KERJA 135,426.15

2,340,000.00 105,300.00
19,250.00 5,775.00
15,600.00 1,560.00
MLAH HARGA BAHAN 112,635.00

MLAH HARGA ALAT

248,061.15
24,806.11
272,867.26

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 104,044.38
166,729.00 55,020.57
182,676.00 6,028.31
194,274.00 6,411.04
MLAH TENAGA KERJA 171,504.30

0.00
0.00
0.00
0.00
0.00
0.00
MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT

171,504.30
17,150.43
188,654.73

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 104,044.38
166,729.00 55,020.57
0.00 0.00
194,274.00 6,411.04
MLAH TENAGA KERJA 165,475.99

2,340,000.00 93,600.00
19,250.00 7,700.00
15,600.00 3,120.00
1,650,000.00 29,700.00
120,000.00 42,000.00
26,400.00 52,800.00
352,000.00 228,920.00

MLAH HARGA ALAT

394,395.99
39,439.60
433,835.59 340,235.59

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 104,044.38
166,729.00 55,020.57
182,676.00 6,028.31
194,274.00 6,411.04
MLAH TENAGA KERJA 171,504.30

2,340,000.00 93,600.00
19,250.00 7,700.00
15,600.00 3,120.00
2,340,000.00 42,120.00
120,000.00 42,000.00
26,400.00 158,400.00
MLAH HARGA BAHAN 346,940.00

MLAH HARGA ALAT

518,444.30
51,844.43
570,288.73

Harga Satuan Jumlah Harga


(Rp.) (Rp.)
157,643.00 104,044.38
166,729.00 55,020.57
182,676.00 6,028.31
194,274.00 6,411.04
MLAH TENAGA KERJA 171,504.30

2,340,000.00 93,600.00
19,250.00 7,700.00
15,600.00 3,120.00
2,340,000.00 46,800.00
120,000.00 42,000.00
26,400.00 79,200.00
65,000.00 260,000.00
MLAH HARGA BAHAN 532,420.00

MLAH HARGA ALAT

703,924.30
70,392.43
774,316.73

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 28,375.74
166,729.00 3,334.58
166,729.00 3,334.58
166,729.00 3,334.58
182,676.00 1,096.06
194,274.00 1,748.47
MLAH TENAGA KERJA 41,224.00

1,000,000.00 2,000.00
19,250.00 192.50
15,600.00 18,720.00
9,500.00 28,500.00
16,000.00 7,200.00
1,120.00 4,480.00
235,000.00 1,410.00
220,000.00 1,980.00
MLAH HARGA BAHAN 64,482.50

MLAH HARGA ALAT

105,706.50
10,570.65
116,277.15

(10 x 15) cm
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 46,819.97
166,729.00 5,502.06
166,729.00 5,502.06
166,729.00 5,502.06
182,676.00 1,826.76
194,274.00 2,914.11
MLAH TENAGA KERJA 68,067.01

1,000,000.00 3,000.00
19,250.00 385.00
15,600.00 18,720.00
9,500.00 34,200.00
16,000.00 800.00
1,120.00 6,160.00
235,000.00 2,115.00
220,000.00 3,300.00
MLAH HARGA BAHAN 68,680.00

MLAH HARGA ALAT

136,747.01
20,512.05
157,259.06
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 9,458.58
166,729.00 10,003.74
182,676.00 1,096.06
194,274.00 582.82
MLAH TENAGA KERJA 21,141.20

16,450.00 18,917.50
MLAH HARGA BAHAN 18,917.50

MLAH HARGA ALAT

40,058.70
6,008.80
46,067.50

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 9,458.58
0.00 0.00
5.00 0.03
194,274.00 582.82
MLAH TENAGA KERJA 10,041.43

22,500.00 25,875.00
MLAH HARGA BAHAN 25,875.00

MLAH HARGA ALAT

35,916.43
5,387.46
41,303.90
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 630.57
0.00 0.00
5.00 0.00
194,274.00 38.85
MLAH TENAGA KERJA 669.43

220,000.00 8,800.00
0.00 0.00
17,600.00 70.40
MLAH HARGA BAHAN 8,870.40

MLAH HARGA ALAT

9,539.83
1,430.97
10,970.80

11x22)cm, Tebal 1 Bata Campuran 1SP : 2 PP


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 94,585.80
0.00 0.00
5.00 0.10
194,274.00 5,828.22
MLAH TENAGA KERJA 100,414.12

890.00 124,600.00
1,120.00 48,720.00
185,000.00 14,800.00
MLAH HARGA BAHAN 188,120.00

MLAH HARGA ALAT


288,534.12
43,280.12
331,814.24

11x22)cm, Tebal 1 Bata Campuran 1SP : 4 PP


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 94,585.80
0.00 0.00
5.00 0.10
194,274.00 5,828.22
MLAH TENAGA KERJA 100,414.12

890.00 124,600.00
1,120.00 29,736.00
185,000.00 17,205.00
MLAH HARGA BAHAN 171,541.00

MLAH HARGA ALAT

271,955.12
40,793.27
312,748.39

11x22)cm, Tebal 1/2 Bata Campuran 1SP : 2 PP


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 47,292.90
0.00 0.00
5.00 0.05
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.06

890.00 62,300.00
1,120.00 21,224.00
185,000.00 7,030.00
MLAH HARGA BAHAN 90,554.00
MLAH HARGA ALAT

140,761.06
21,114.16
161,875.22

11x22)cm, Tebal 1/2 Bata Campuran 1SP : 3 PP


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 47,292.90
0.00 0.00
5.00 0.05
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.06

1,100.00 77,000.00
1,500.00 21,555.00
185,000.00 7,400.00
MLAH HARGA BAHAN 105,955.00

MLAH HARGA ALAT

156,162.06
23,424.31
179,586.37

11x22)cm, Tebal 1/2 Bata Campuran 1SP : 4 PP


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 47,292.90
0.00 0.00
5.00 0.05
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.06
890.00 62,300.00
1,120.00 12,880.00
185,000.00 7,955.00
MLAH HARGA BAHAN 83,135.00

MLAH HARGA ALAT

133,342.06
20,001.31
153,343.37

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 47,292.90
0.00 0.00
5.00 0.08
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.09

1,120.00 11,450.88
185,000.00 3,700.00
MLAH HARGA BAHAN 15,150.88

MLAH HARGA ALAT

65,357.97
6,535.80
71,893.76

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 47,292.90
0.00 0.00
5.00 0.08
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.09

1,120.00 6,988.80
185,000.00 4,440.00
MLAH HARGA BAHAN 11,428.80

MLAH HARGA ALAT

61,635.89
6,163.59
67,799.47

n Batu Kali Campuran 1SP : 2 PP


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 47,292.90
0.00 0.00
5.00 0.08
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.09

1,120.00 7,100.80
185,000.00 2,220.00
MLAH HARGA BAHAN 9,320.80

MLAH HARGA ALAT

59,527.89
5,952.79
65,480.67

Harga Satuan Jumlah Harga


(Rp.) (Rp.)
157,643.00 31,528.60
0.00 0.00
5.00 0.05
194,274.00 1,942.74
MLAH TENAGA KERJA 33,471.39

1,120.00 3,640.00
MLAH HARGA BAHAN 3,640.00

MLAH HARGA ALAT

37,111.39
3,711.14
40,822.53

uran 1SP : 2 PP Tebal 15 mm


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 40,987.18
0.00 0.00
5.00 0.10
194,274.00 2,525.56
MLAH TENAGA KERJA 43,512.84

1,120.00 9,296.00
185,000.00 3,330.00
MLAH HARGA BAHAN 12,626.00

MLAH HARGA ALAT

56,138.84
5,613.88
61,752.73

Harga Satuan Jumlah Harga


(Rp.) (Rp.)
157,643.00 110,350.10
0.00 0.00
5.00 0.18
194,274.00 6,799.59
MLAH TENAGA KERJA 117,149.87

0.00 0.00
1,120.00 13,160.00
185,000.00 6,475.00
MLAH HARGA BAHAN 19,635.00

MLAH HARGA ALAT

136,784.87
20,517.73
157,302.59

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 18,917.16
0.00 0.00
5.00 0.03
194,274.00 1,165.64
MLAH TENAGA KERJA 20,082.83

0.00 0.00
10,000.00 3,460.00
MLAH HARGA BAHAN 3,460.00

MLAH HARGA ALAT

23,542.83
3,531.43
27,074.26
n menie besi dengan perancah
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 39,410.75
0.00 0.00
5.00 0.11
194,274.00 1,457.06
MLAH TENAGA KERJA 40,867.92

24,200.00 2,420.00
11,600.00 116.00
12,500.00 125.00
3,750,000.00 7,500.00
MLAH HARGA BAHAN 10,161.00

MLAH HARGA ALAT

51,028.92
7,654.34
58,683.26

is secara manual 4 lapis


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 39,410.75
0.00 0.00
5.00 0.13
194,274.00 242.84
MLAH TENAGA KERJA 39,653.72

95,200.00 9,520.00
95,200.00 9,520.00
95,200.00 7,616.00
12,500.00 125.00
10,000.00 100.00
MLAH HARGA BAHAN 26,881.00
MLAH HARGA ALAT

66,534.72
9,980.21
76,514.93

nis Secara Manual sistem 1 Lapis Cat Mutakhir


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 9,458.58
Err:509 Err:509
Err:509 Err:509
194,274.00 582.82
MLAH TENAGA KERJA Err:509

95,200.00 28,560.00
12,500.00 125.00
10,000.00 100.00
MLAH HARGA BAHAN 28,785.00

MLAH HARGA ALAT

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 16,552.52
Err:509 Err:509
194,274.00 2,137.01
MLAH TENAGA KERJA Err:509
786,500.00 786,500.00
MLAH HARGA BAHAN 786,500.00

375,000.00 3,750.00

MLAH HARGA ALAT 3,750.00

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 18,601.87
Err:509 Err:509
194,274.00 2,331.29
MLAH TENAGA KERJA Err:509

0.00 0.00
MLAH HARGA BAHAN 0.00

375,000.00 4,500.00

MLAH HARGA ALAT 4,500.00

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 29,794.53
Err:509 Err:509
194,274.00 3,691.21
MLAH TENAGA KERJA Err:509
48,400.00 48,400.00
MLAH HARGA BAHAN 48,400.00

375,000.00 9,000.00

MLAH HARGA ALAT 9,000.00

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 40,356.61
Err:509 Err:509
194,274.00 5,051.12
MLAH TENAGA KERJA Err:509

98,120.00 98,120.00
MLAH HARGA BAHAN 98,120.00

375,000.00 12,750.00

MLAH HARGA ALAT 12,750.00

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 46,347.04
Err:509 Err:509
194,274.00 5,633.95
MLAH TENAGA KERJA Err:509
146,520.00 146,520.00
MLAH HARGA BAHAN 146,520.00

375,000.00 15,000.00

MLAH HARGA ALAT 15,000.00

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 63,057.20
Err:509 Err:509
194,274.00 7,770.96
MLAH TENAGA KERJA Err:509

0.00 0.00
MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT 0.00

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 79,767.36
Err:509 Err:509
194,274.00 9,830.26
MLAH TENAGA KERJA Err:509

5,660.00 0.00
MLAH HARGA BAHAN 0.00
MLAH HARGA ALAT 0.00

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 125,483.83
Err:509 Err:509
194,274.00 15,464.21
MLAH TENAGA KERJA Err:509

68,090.00 68,090.00
MLAH HARGA BAHAN 68,090.00

MLAH HARGA ALAT 68,090.00

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 149,603.21
Err:509 Err:509
194,274.00 18,436.60
MLAH TENAGA KERJA Err:509

99,970.00 99,970.00
MLAH HARGA BAHAN 99,970.00

MLAH HARGA ALAT 99,970.00

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 151,021.99
Err:509 Err:509
194,274.00 18,611.45
MLAH TENAGA KERJA Err:509

210,500.00 210,500.00
MLAH HARGA BAHAN 210,500.00

MLAH HARGA ALAT 210,500.00

Err:509
Err:509
Err:509

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 91,275.30
Err:509 Err:509
194,274.00 11,248.46
MLAH TENAGA KERJA Err:509

1,867,800.00 1,867,800.00
MLAH HARGA BAHAN 1,867,800.00

375,000.00 1,500.00

MLAH HARGA ALAT 1,500.00

Err:509
Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 111,611.24
0.00 0.00
194,274.00 13,754.60
MLAH TENAGA KERJA 125,365.84

0.00
MLAH HARGA BAHAN 0.00

375,000.00 1,500.00

MLAH HARGA ALAT 1,500.00

126,865.84
12,686.58
139,552.43

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 175,456.66
0.00 0.00
194,274.00 21,622.70
MLAH TENAGA KERJA 197,079.36

4,998,800.00 4,998,800.00
MLAH HARGA BAHAN 4,998,800.00

375,000.00 1,500.00

MLAH HARGA ALAT 1,500.00

5,197,379.36
519,737.94
5,717,117.29
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 225,271.85
0.00 0.00
194,274.00 27,761.75
MLAH TENAGA KERJA 253,033.60

56,160,000.00 56,160,000.00
MLAH HARGA BAHAN 56,160,000.00

375,000.00 37,500.00

MLAH HARGA ALAT 37,500.00

56,450,533.60
5,645,053.36
62,095,586.96

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 270,200.10
0.00 0.00
194,274.00 33,298.56
MLAH TENAGA KERJA 303,498.67

78,000,000.00 78,000,000.00
MLAH HARGA BAHAN 78,000,000.00

375,000.00 112,500.00

MLAH HARGA ALAT 112,500.00

78,415,998.67
7,841,599.87
86,257,598.53

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 16,710.16
0.00 0.00
194,274.00 2,137.01
MLAH TENAGA KERJA 18,847.17

435,000.00 435,000.00
MLAH HARGA BAHAN 435,000.00

375,000.00 10,500.00

MLAH HARGA ALAT 10,500.00

447,637.01
44,763.70
492,400.72

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 34,050.89
0.00 0.00
194,274.00 4,274.03
MLAH TENAGA KERJA 38,324.92

6,000.00 6,000.00
MLAH HARGA BAHAN 6,000.00

375,000.00 10,875.00

MLAH HARGA ALAT 10,875.00

21,149.03
2,114.90
23,263.93

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 1,261.14
194,274.00 155.42
MLAH TENAGA KERJA 1,416.56

125,000.00 2,207.81
7,400.00 444.00
19,500.00 39.00
MLAH HARGA BAHAN 2,690.81

MLAH HARGA ALAT 0.00

4,107.38
410.74
4,518.11

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 1,261.14
194,274.00 155.42
MLAH TENAGA KERJA 1,416.56

125,000.00 3,925.00
7,400.00 444.00
19,500.00 39.00
MLAH HARGA BAHAN 4,408.00

MLAH HARGA ALAT 0.00

5,824.56
582.46
6,407.02

eter) saluran tertutup


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

0.00
0.00
0.00
0.00
MLAH TENAGA KERJA 0.00

3,638,800.00 3,638,800.00
MLAH HARGA BAHAN 3,638,800.00

0.00
MLAH HARGA ALAT 0.00

3,638,800.00
363,880.00
4,002,680.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 1,261.14
194,274.00 155.42
MLAH TENAGA KERJA 1,416.56

100,000.00 7,800.00

MLAH HARGA BAHAN 7,800.00

MLAH HARGA ALAT


9,216.56
921.66
10,138.22

ran tertutup
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

0.00
0.00
0.00
0.00

MLAH TENAGA KERJA 0.00

0.00
0.00

MLAH HARGA BAHAN 0.00

0.00
MLAH HARGA ALAT 0.00

0.00
0.00
0.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

MLAH TENAGA KERJA


MLAH HARGA BAHAN

MLAH HARGA ALAT

a (K-250) Kedap Air, Slump (12 ± 2) cm, w/c = 0.56


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 260,110.95
182,676.00 50,235.90
182,676.00 5,114.93
194,274.00 320,552.10
MLAH TENAGA KERJA 636,013.88

56,000.00
235,000.00
237,000.00

MLAH HARGA BAHAN

MLAH HARGA ALAT

Jenis Pekerjaan : 1 Kg Pembesian besi 8

Harga Satuan Jumlah Harga


No. Uraian
(Rp.) (Rp.)

A TENAGA
157,643.00 1,103.50 - Pekerja
166,729.00 1,167.10 - Tukang Besi
182,767.00 127.94 - Kepala Tukang
194,274.00 77.71 - Mandor
MLAH TENAGA KERJA 2,476.25
B BAHAN
7,120.00 7,476.00 - Besi Beton(Pol
21,000.00 315.00 - kawat Ikat

MLAH HARGA BAHAN 7,791.00


C PERALATAN
-
MLAH HARGA ALAT

10,267.25 D Jumlah (A + B + C)
1,026.73 E Over head & Profit (maksimum 15 % x D)
11,293.98 F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

an Menggunakan Papan 3x20 cm


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

MLAH TENAGA KERJA

MLAH HARGA BAHAN

MLAH HARGA ALAT


n dan membereskan puing-puing)
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

MLAH TENAGA KERJA

MLAH HARGA BAHAN

MLAH HARGA ALAT

Manual Sistim 1 lapis cat Mutakhir untuk reling


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

MLAH TENAGA KERJA

MLAH HARGA BAHAN

MLAH HARGA ALAT

g Jalan Setapak
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

MLAH TENAGA KERJA

MLAH HARGA BAHAN

MLAH HARGA ALAT

g Jalan Setapak
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

MLAH TENAGA KERJA

MLAH HARGA BAHAN

MLAH HARGA ALAT


) Grill saluran
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 9,458.58
166,729.00 10,003.74
182,676.00 1,096.06
194,274.00 582.82
MLAH TENAGA KERJA 21,141.20

183,333.00 183,333.00

MLAH HARGA BAHAN 183,333.00

MLAH HARGA ALAT

183,915.82
18,391.58
202,307.40

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

0.00
0.00
0.00
0.00
MLAH TENAGA KERJA

0.00

MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT

0.00
0.00
0.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 6,305.72
166,729.00 3,334.58
182,676.00 365.35
194,274.00 388.55
MLAH TENAGA KERJA

35,000.00 14,000.00
9,300.00 2,790.00
60,000.00 2,400.00
MLAH HARGA BAHAN 19,190.00

MLAH HARGA ALAT

19,578.55
1,957.85
21,536.40

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 6,305.72
194,274.00 388.55
MLAH TENAGA KERJA

100,000.00 40,000.00
MLAH HARGA BAHAN 40,000.00

MLAH HARGA ALAT

40,388.55
4,038.85
44,427.40

a (K-350) Kedap Air, Slump (12 ± 2) cm, w/c = 0.48 Kedap Air
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 331,050.30
166,729.00 58,355.15
182,676.00 6,393.66
194,274.00 40,797.54
MLAH TENAGA KERJA 436,596.65

1,500.00 672,000.00
312,000.00 208,104.00
237,000.00 237,000.00
0.00
MLAH HARGA BAHAN 1,117,104.00

MLAH HARGA ALAT

1,553,700.65
155,370.07
1,709,070.72

Beton Saluran
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 104,044.38
166,729.00 55,020.57
182,676.00 6,028.31
194,274.00 6,411.04
MLAH TENAGA KERJA 171,504.30

205,000.00 26,240.00
1,650,000.00 11,550.00
17,000.00 5,100.00
69,400.00 13,880.00
MLAH HARGA BAHAN 56,770.00

MLAH HARGA ALAT

228,274.30
22,827.43
251,101.73

remesh ) M12
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 3,941.08
166,729.00 4,168.23
182,676.00 4,566.90
194,274.00 194.27
MLAH TENAGA KERJA 12,870.47

113,315.00 1,155,813.00
21,000.00 1,050.00
MLAH HARGA BAHAN 1,156,863.00

MLAH HARGA ALAT

1,169,733.47
116,973.35
1,286,706.82

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 6,778.65
0.00 0.00
182,676.00 7,855.07
194,274.00 4,079.75
MLAH TENAGA KERJA 18,713.47

0.00
0.00

MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT

0.00
0.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 6,778.65 2
0.00 0.00
182,676.00 7,855.07
194,274.00 4,079.75
MLAH TENAGA KERJA 18,713.47

0.00
0.00
0.00
MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT

0.00
0.00

40cmx40cm
Harga Satuan Jumlah Harga

(Rp.) (Rp.) - Semen Portland


- Pasir Beton
- Kerikil
157,643.00 110,350.10 - Air
166,729.00 58,355.15
182,676.00 6,393.66
194,274.00 6,799.59
MLAH TENAGA KERJA 181,898.50

7,500.00 49,725.00 45,000.00 6 7,500.00


1,500.00 14,700.00
7,000.00 0.00
185,000.00 0.00
MLAH HARGA BAHAN 64,425.00

MLAH HARGA ALAT 15,000.00

261,323.50
26,132.35
287,455.85

mx20cm kamar mandi


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 110,350.10
166,729.00 58,355.15
182,676.00 6,393.66
194,274.00 6,799.59
MLAH TENAGA KERJA 181,898.50

52,000.00 54,600.00
1,500.00 15,600.00
7,000.00 7,000.00
185,000.00 8,325.00
MLAH HARGA BAHAN 70,200.00

MLAH HARGA ALAT 15,000.00


267,098.50
26,709.85
293,808.35

cmx25cm kamar mandi


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 141,878.70
166,729.00 75,028.05
182,676.00 8,220.42
194,274.00 8,742.33
MLAH TENAGA KERJA 233,869.50

2,750.00 55,000.00
1,500.00 13,950.00 52,000.00 2,600.000
7,000.00 0.00
185,000.00 0.00
MLAH HARGA BAHAN 68,950.00 55,000.00 2,750.000

MLAH HARGA ALAT 15,000.00

317,819.50
31,781.95
349,601.45

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 14,187.87
166,729.00 15,005.61
182,676.00 6,393.66
194,274.00 971.37
MLAH TENAGA KERJA 36,558.51

4,000.00 10,000.00
15,000.00 17,100.00
10,000.00 250.00
185,000.00 555.00
MLAH HARGA BAHAN 27,100.00

MLAH HARGA ALAT

63,658.51
6,365.85
70,024.36

= 6cm carport
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 39,410.75
166,729.00 83,364.50
182,676.00 9,133.80
194,274.00 252.56
MLAH TENAGA KERJA 132,161.61

110,000.00 111,100.00
185,000.00 9,250.00

MLAH HARGA BAHAN 120,350.00

MLAH HARGA ALAT 15,000.00

267,511.61
26,751.16
294,262.77

ard t=9mm
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 15,764.30
166,729.00 8,336.45
182,676.00 913.38
194,274.00 971.37
MLAH TENAGA KERJA 25,985.50

0.00
0.00

MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT

0.00
0.00
atap pelana
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 31,528.60
166,729.00 16,672.90
182,676.00 1,826.76
194,274.00 194.27
MLAH TENAGA KERJA 50,222.53

0.00
0.00

MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT

0.00
0.00

x100 atap pelana


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 39,410.75
166,729.00 25,009.35
182,676.00 2,740.14
194,274.00 2,525.56
MLAH TENAGA KERJA 69,685.80

0.00
0.00

MLAH HARGA BAHAN 0.00


MLAH HARGA ALAT

0.00
0.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 23,646.45
166,729.00 8,336.45
182,676.00 913.38
194,274.00 1,554.19
MLAH TENAGA KERJA 34,450.47

0.00

MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT

0.00
0.00

plamir, 1 lapis cat dasar, 1 lapis cat penutup


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,643.00 31,528.60
166,729.00 10,503.93
182,676.00 1,150.86
194,274.00 582.82
MLAH TENAGA KERJA 43,766.21 25 319,000.00 12,760.00

15,000.00 1,500.00
12,760.00 1,276.00
12,760.00 3,317.60

MLAH HARGA BAHAN 2,776.00

MLAH HARGA ALAT 15,000.00

61,542.21
6,154.22
67,696.43

Jenis Pekerjaan

No.
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
A

157,643.00 1,576.43
166,729.00 1,667.29
182,676.00 1,826.76
194,274.00 971.37
MLAH TENAGA KERJA 6,041.85 B

65,000.00 65,000.00

MLAH HARGA BAHAN 65,000.00 C

MLAH HARGA ALAT 25,000.00


D
96,041.85 E
9,604.19 F
105,646.04 PERMEN PUPR NO.28/PRT/M/

Jenis Pekerjaan

0 tinggi 65 cm
No.
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
A
157,643.00 504,457.60
166,729.00 191,738.35
182,676.00 2,009.44
194,274.00 3,108.38
MLAH TENAGA KERJA 701,313.77 B

MLAH HARGA BAHAN 0.00

D
MLAH HARGA ALAT E
F
PERMEN PUPR NO.28/PRT/M/
0.00
0.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 1,576.43
166,729.00 66,691.60
182,676.00 7,307.04
194,274.00 971.37
MLAH TENAGA KERJA 76,546.44

21,450.00 21,450.00
8,000.00 200.00

MLAH HARGA BAHAN 21,650.00

MLAH HARGA ALAT 15,000.00


113,196.44
11,319.64
124,516.08

meter 1/2''
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,645.00 1,576.45
0.00
0.00
0.00
MLAH TENAGA KERJA 1,576.45
4 1,312.50
5,250.00 6,300.00
1,837.00 1,837.00 35% 1,837.50

MLAH HARGA BAHAN 8,137.00

MLAH HARGA ALAT 15,000.00

24,713.45
3,707.02
28,420.47

meter 3/4''
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

157,645.00 5,675.22

MLAH TENAGA KERJA 5,675.22

8,000.00 9,600.00 35% 2800


2,800.00 2,800.00
4 2000
MLAH HARGA BAHAN 12,400.00
2,800.00

MLAH HARGA ALAT 15,000.00

33,075.22
4,961.28
38,036.50

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,645.00 12,769.25

MLAH TENAGA KERJA 12,769.25

27,000.00 32,400.00 35% 9,450.00


9,450.00 9,450.00
4 6,750.00
MLAH HARGA BAHAN 41,850.00

MLAH HARGA ALAT 15,000.00

69,619.25
10,442.89
80,062.13

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,645.00 12,769.25

MLAH TENAGA KERJA 12,769.25


45,000.00 54,000.00 4 11,250.00
15,750.00 15,750.00
35% 15,750.00
MLAH HARGA BAHAN 69,750.00

MLAH HARGA ALAT 15,000.00

97,519.25
14,627.89
112,147.13

Jenis Pekerjaan :

Harga Satuan Jumlah Harga


No. Uraian
(Rp.) (Rp.)

A TENAGA
157,643.00 520,221.90 -
166,729.00 183,401.90 -
182,676.00 1,826.76 -
194,274.00 31,083.84 -
MLAH TENAGA KERJA 736,534.40
B BAHAN
1,499,000.000 1,499,000.00 -
89,940.00 6% -
-
MLAH HARGA BAHAN 1,588,940.00
C PERALATAN

MLAH HARGA ALAT 25,000.00

2,350,474.40 D Jumlah (A + B + C)
352,571.16 E Over head & Profit (maksimum 15 % x D)
2,703,045.56 F Harga Satuan Pekerjaan (D + E)

Harga Satuan Jumlah Harga


(Rp.) (Rp.)
MLAH TENAGA KERJA 0.00

MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT

0.00
0.00

4x2 modul 60x60 untuk plafond


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

166,729.00 58,355.15
182,676.00 6,393.66
194,274.00 3,496.93
MLAH TENAGA KERJA 68,245.74

24,000.00
24,000.00

MLAH HARGA BAHAN 48,000.00

MLAH HARGA ALAT 3,600.00

119,845.74
17,976.86
137,822.60

ja canai dingin profil C 75


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

75.00
157,643.00 115,709.96
166,729.00 122,379.09
182,676.00 13,335.35
194,274.00 7,188.14
MLAH TENAGA KERJA 258,612.53

125,000.00 383,125.00

MLAH HARGA BAHAN 383,125.00 10%

MLAH HARGA ALAT 38,312.50

680,050.03
102,007.51
782,057.54

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

MLAH TENAGA KERJA 0.00

24,000.00 72,000.00
11,500.00 172,500.00
1,500.00 1,500.00
6,000.00 12,000.00
1,000.00 24,000.00
MLAH HARGA BAHAN 244,500.00

MLAH HARGA ALAT

0.00
0.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55

MLAH TENAGA KERJA 40,094.48

11,800.00 11,800.00
11,500.00 138,000.00
5,250.00 63,000.00

MLAH HARGA BAHAN 201,000.00

MLAH HARGA ALAT 15,000.00

256,094.48
38,414.17
294,508.65

Harga Satuan Jumlah Harga


(Rp.) (Rp.)
182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55

MLAH TENAGA KERJA 40,094.48

175,000.00 175,000.00

10% 17,500

MLAH HARGA BAHAN

MLAH HARGA ALAT 17,500.00

232,594.48
34,889.17
267,483.65

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55

MLAH TENAGA KERJA 40,094.48

46,000.00

MLAH HARGA BAHAN 46,000.00


MLAH HARGA ALAT 15,000.00

101,094.48
15,164.17
116,258.65

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55

MLAH TENAGA KERJA 40,094.48

32,500.00

MLAH HARGA BAHAN 32,500.00

MLAH HARGA ALAT 15,000.00

87,594.48
13,139.17
100,733.65

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55

MLAH TENAGA KERJA 40,094.48

148,500.00

MLAH HARGA BAHAN 148,500.00

MLAH HARGA ALAT 15,000.00

203,594.48
30,539.17
234,133.65

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55

MLAH TENAGA KERJA 40,094.48

175,000.00

MLAH HARGA BAHAN 175,000.00

MLAH HARGA ALAT 15,000.00


230,094.48
34,514.17
264,608.65

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55

MLAH TENAGA KERJA 40,094.48

20,580.00 20,580.00

MLAH HARGA BAHAN 20,580.00

MLAH HARGA ALAT 15,000.00

75,674.48
11,351.17
87,025.65

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55
MLAH TENAGA KERJA 40,094.48

20,610.00

MLAH HARGA BAHAN 20,610.00

MLAH HARGA ALAT 15,000.00

75,704.48
11,355.67
87,060.15

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

MLAH TENAGA KERJA 0.00

MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT 15,000.00


0.00
0.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

182,676.00 18,267.60
157,643.00 23,646.45
194,274.00 9,713.70

MLAH TENAGA KERJA 51,627.75

11,500.00 11,500.00

MLAH HARGA BAHAN 11,500.00

MLAH HARGA ALAT 15,000.00

78,127.75
11,719.16
89,846.91

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 2,364.65
166,729.00 25,009.35
182,676.00 2,740.14
194,274.00 155.42
MLAH TENAGA KERJA 30,269.55
105,000.00 115,500.00
50,000.00

MLAH HARGA BAHAN 115,500.00

MLAH HARGA ALAT 15,000.00

160,769.55
24,115.43
184,884.99

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 122,961.54
166,729.00 65,024.31
182,676.00 7,124.36
194,274.00 7,576.69
MLAH TENAGA KERJA 202,686.90

130,000.00 156,000.00
150,000.00 64,800.00

MLAH HARGA BAHAN 220,800.00

MLAH HARGA ALAT 15,000.00

438,486.90
65,773.04
504,259.94

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

157,643.00 18,917.16
0.00 0.00
157,643.00 945.86
194,274.00 1,165.64
MLAH TENAGA KERJA 21,028.66

0.00 0.00
0.00 0.00
MLAH HARGA BAHAN 0.00

MLAH HARGA ALAT

21,028.66
3,154.30
24,182.96

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

7,000.00 3,500.00
50.000 6.25
3,000.00 18,126.00
25,000.00 25,000.00
MLAH TENAGA KERJA 46,632.25

1,228,006.81 153,500.85
2,800,000.00 8,400.00
105,000.00 105,000.00
50,000.00 25,000.00
325,000.00 2,600.00 harga perlembar 576,000.00
9,500.00 21,204.00
10,500.00 1,050.00 5

MLAH HARGA BAHAN 316,754.85

25,000.00
MLAH HARGA ALAT 25,000.00

388,387.10
388,387.10 2 14 28
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

166,729.00 33,345.80
182,676.00 3,653.52
194,274.00 5,828.22
MLAH TENAGA KERJA 42,827.54

63,499.00 23,113.64
10,000.00 1,100.00
0.00
MLAH HARGA BAHAN 24,213.64

MLAH HARGA ALAT

67,041.18
10,056.18
77,097.35
Kg Pembesian besi 8
Harga
Jumlah Harga
Kode Satuan Koefisien Satuan
(Rp.) (Rp.)

L.01 O/H 0.0070 157,643.00 1,103.50


L.02 O/H 0.0070 166,729.00 1,167.10
L.03 O/H 0.0007 182,767.00 127.94
L.04 O/H 0.0004 194,274.00 77.71
JUMLAH TENAGA KERJA 2,476.25

M.55.d kg 1.05 3,583.00 3,762.15


M.67 kg 0.0150 21,000.00 315.00

JUMLAH HARGA BAHAN 4,077.15

JUMLAH HARGA ALAT

6,553.40
10% 655.34
7,208.74
BIDANG CIPTA KARYA
7,208.74
:
Uraian
Kg 247.000 1,500.00 370,500.00
m3 0.517 312,000.00 161,385.71
m3 0.740 237,000.00 175,380.00 TENAGA
Liter 215.000 0.00 -
-
-
-

BAHAN
-
-
-
-

PERALATAN

Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D)
Harga Satuan Pekerjaan (D + E)
nis Pekerjaan : A.4.7.1.10. Pengecatan 1 m2 tembok terbaru 1 lapis plamir, 1 lapis cat dasar, 1 lapis c

Uraian Kode Satuan Koefisien

TENAGA
- Pekerja L.01 O/H 0.200
- Tukang kayu L.02 O/H 0.063
- Kepala Tukang L.03 O/H 0.0063
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KERJA
BAHAN
- plamur kg 0.10
- cat dasar kg 0.10
- cat penutup kg 0.260
-
JUMLAH HARGA BAHAN
PERALATAN

JUMLAH HARGA ALAT

Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D) 10%
Harga Satuan Pekerjaan (D + E)
RMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

nis Pekerjaan : A.5.1.1.14. Pemasangan 1 buah roof drain

Uraian Kode Satuan Koefisien

TENAGA
- Pekerja L.01 O/H 0.010
- Tukang batu L.02 O/H 0.010
- Kepala Tukang L.03 O/H 0.010
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
BAHAN
- roof drain unit 1.00
-
-
-
JUMLAH HARGA BAHAN
PERALATAN

JUMLAH HARGA ALAT

Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D) 10%
Harga Satuan Pekerjaan (D + E)
RMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A.5.1.1.. Pemasangan 1 buah shower

Harga Satuan Jumlah Harga


Uraian Kode Satuan Koefisien
(Rp.) (Rp.)

Pekerja L.01 O/H 3.30 157,643.00 520,221.90


Tukang batu L.02 O/H 1.10 166,729.00 183,401.90
Kepala Tukang batu L.03 O/H 0.01 182,676.00 1,826.76
Mandor L.04 O/H 0.16 194,274.00 31,083.84
JUMLAH TENAGA KERJA 736,534.40

shower TOTO unit 1.00 145,000.000 145,000.00


perlengkapan ls 6%xcloset 8,700.00

JUMLAH HARGA BAHAN 153,700.00

JUMLAH HARGA ALAT 25,000.00

915,234.40
t (maksimum 15 % x D) 15% 137,285.16
kerjaan (D + E) 1,052,519.56
115,200.00

10,874,838.83
Jenis Pekerjaan : 1 Kg Pembesian besi ULIR D 16

No. Uraian Kode

A TENAGA
- Pekerja L.01
- Tukang Besi L.02
- Kepala Tukang Besi L.03
- Mandor L.04

B BAHAN
- Besi Beton(Polos/Ulir) M.55.d
- kawat Ikat M.67

C PERALATAN
-

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D)
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 40cmx40cm
Harga Satuan
Uraian Kode Satuan Koefisien
(Rp.)

Pekerja L.01 O/H 0.700 157,643.00


Tukang batu L.02 O/H 0.350 166,729.00
Kepala Tukang Batu/Be L.03 O/H 0.035 182,676.00
Mandor L.04 O/H 0.035 194,274.00
JUMLAH TENAGA KERJA

keramik 40x40 kasar bh 6.630 8,295.63


semen portland kg 9.800 1,500.00
semen warna kg 0.600 7,000.00
pasir pasang m3 0.045 185,000.00
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

mum 15 % x D) 10%
plamir, 1 lapis cat dasar, 1 lapis cat penutup interior

Harga Satuan Jumlah Harga

(Rp.) (Rp.)

157,643.00 31,528.60
166,729.00 10,503.93
182,676.00 1,150.86
194,274.00 582.82
H TENAGA KERJA 43,766.21

15,000.00 1,500.00 25 792,000.00


31,680.00 3,168.00
31,680.00 8,236.80

H HARGA BAHAN 12,904.80

H HARGA ALAT 15,000.00

71,671.01
7,167.10
78,838.11

Harga Satuan Jumlah Harga

(Rp.) (Rp.)
157,643.00 1,576.43
166,729.00 1,667.29
182,676.00 1,826.76
194,274.00 971.37
H TENAGA KERJA 6,041.85

50,000.00 50,000.00

H HARGA BAHAN 50,000.00

H HARGA ALAT 15,000.00

71,041.85
7,104.19
78,146.04
Jenis Pekerjaan : 1 Kg Pembesian besi
Harga
Jumlah Harga
Satuan Koefisien Satuan No. Uraian
(Rp.) (Rp.)

A TENAGA
O/H 0.0070 157,643.00 1,103.50 - Pekerja
O/H 0.0070 166,729.00 1,167.10 - Tukang Bes
O/H 0.0007 182,767.00 127.94 - Kepala Tuk
O/H 0.0004 194,274.00 77.71 - Mandor
JUMLAH TENAGA KERJA 2,476.25
B BAHAN
kg 1.05 13,408.00 14,078.40 - Besi Beton(
kg 0.0150 21,000.00 315.00 - kawat Ikat

JUMLAH HARGA BAHAN 14,393.40


C PERALATAN
-
JUMLAH HARGA ALAT

16,869.65 D Jumlah (A + B + C)
10% 1,686.97 E Over head & Profit (maksimum 15 % x D)
F Harga Satuan Pekerjaan (D + E)
18,556.62
Jumlah Harga

(Rp.)

110,350.10
58,355.15
6,393.66
6,799.59
181,898.50

55,000.03 55,000.00 8,295.63


14,700.00
0.00
0.00
69,700.03

15,000.00

266,598.53
26,659.85
293,258.38
Jenis Pekerjaan : A.4.7.1.10. Pengecatan 1 m2 tembok terbaru no drop

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.200
- Tukang kayu L.02 O/H 0.063
- Kepala Tukang L.03 O/H 0.0063
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KER
B BAHAN
31,680.00 - plamur kg 0.10
- cat dasar kg 0.10
- cat penutup kg 0.260
-
JUMLAH HARGA BAHA
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA

Jenis Pekerjaan : A.5.1.1.14. Pemasangan 1 buah stop kran

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.010
- Tukang batu L.02 O/H 0.010
- Kepala Tukang L.03 O/H 0.010
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KER
B BAHAN
- roof drain unit 1.00
-
-
-
JUMLAH HARGA BAHA
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
1 Kg Pembesian besi O 12 Jenis Pekerjaan
Harga
Jumlah Harga
Kode Satuan Koefisien Satuan No. Uraian
(Rp.) (Rp.)

A TENAGA
L.01 O/H 0.0070 157,643.00 1,103.50
L.02 O/H 0.0070 166,729.00 1,167.10
L.03 O/H 0.0007 182,767.00 127.94
L.04 O/H 0.0004 194,274.00 77.71
JUMLAH TENAGA KERJA 2,476.25
B BAHAN
M.55.d kg 1.05 8,283.00 8,697.15
M.67 kg 0.0150 21,000.00 315.00

JUMLAH HARGA BAHAN 9,012.15


C PERALATAN

JUMLAH HARGA ALAT

11,488.40 D Jumlah (A + B + C)
maksimum 15 % x D) 10% 1,148.84 E Over head & Profit (maksimu
12,637.24 F Harga Satuan Pekerjaan (D +
bok terbaru no drop

Harga Satuan Jumlah Harga

(Rp.) (Rp.)

157,643.00 31,528.60
166,729.00 10,503.93
182,676.00 1,150.86
194,274.00 582.82
JUMLAH TENAGA KERJA 43,766.21 4 189,200.00 47,300.00

15,000.00 1,500.00
47,300.00 4,730.00
47,300.00 12,298.00

JUMLAH HARGA BAHAN 18,528.00

JUMLAH HARGA ALAT 15,000.00

77,294.21
7,729.42
85,023.63

Harga Satuan Jumlah Harga

(Rp.) (Rp.)
157,643.00 1,576.43
166,729.00 1,667.29
182,676.00 1,826.76
194,274.00 971.37
JUMLAH TENAGA KERJA 6,041.85

65,000.00 65,000.00

JUMLAH HARGA BAHAN 65,000.00

JUMLAH HARGA ALAT 15,000.00

86,041.85
8,604.19
94,646.04
: 1 Kg Pembesian besi O 10 Jenis Pekerjaan

Harga Satuan Jumlah Harga


Uraian Kode Satuan Koefisien No.
(Rp.) (Rp.)

A
- Pekerja L.01 O/H 0.0070 157,643.00 1,103.50
- Tukang Bes L.02 O/H 0.0070 166,729.00 1,167.10
- Kepala Tuk L.03 O/H 0.0007 182,767.00 127.94
- Mandor L.04 O/H 0.0004 194,274.00 77.71
JUMLAH TENAGA KERJA 2,476.25
B
- Besi Beton(M.55.d kg 1.05 5,250.00 5,512.50
- kawat Ikat M.67 kg 0.0150 21,000.00 315.00

JUMLAH HARGA BAHAN 5,827.50


PERALATAN C
-
JUMLAH HARGA ALAT

Jumlah (A + B + C) 8,303.75 D
Over head & Profit (maksimum 15 % x D) 10% 830.38 E
Harga Satuan Pekerjaan (D + E) F

9,134.13
Jenis Pekerjaan : 1 Kg Pembesian besi D 13
Harga
Jumlah Harga
Uraian Kode Satuan Koefisien Satuan
(Rp.) (Rp.)

TENAGA
- Pekerja L.01 O/H 0.0070 157,643.00 1,103.50
- Tukang Bes L.02 O/H 0.0070 166,729.00 1,167.10
- Kepala Tuk L.03 O/H 0.0007 182,767.00 127.94
- Mandor L.04 O/H 0.0004 194,274.00 77.71
JUMLAH TENAGA KERJA 2,476.25
BAHAN
- Besi Beton(M.55.d kg 1.05 8,770.00 9,208.50
- kawat Ikat M.67 kg 0.0150 21,000.00 315.00

JUMLAH HARGA BAHAN 9,523.50


PERALATAN
-
JUMLAH HARGA ALAT

Jumlah (A + B + C) 11,999.75
Over head & Profit (maksimum 15 % x D) 10% 1,199.98
Harga Satuan Pekerjaan (D + E) 13,199.73
Jenis Pekerjaan : 1 Kg Pembesian besi O 19

No. Uraian Kode Satuan Koefisien

A TENAGA
- Pekerja L.01 O/H 0.0070
- Tukang Besi L.02 O/H 0.0070
- Kepala Tukang Besi L.03 O/H 0.0007
- Mandor L.04 O/H 0.0004
JUMLAH TENAGA KERJA
B BAHAN
- Besi Beton(Polos/Ulir) M.55.d kg 1.05
- kawat Ikat M.67 kg 0.0150

JUMLAH HARGA BAHAN


C PERALATAN
-
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
Harga Satuan Jumlah Harga

(Rp.) (Rp.)

157,643.00 1,103.50
166,729.00 1,167.10
182,767.00 127.94
194,274.00 77.71
JUMLAH TENAGA KERJA 2,476.25

18,800.00 19,740.00
21,000.00 315.00

JUMLAH HARGA BAHAN 20,055.00

JUMLAH HARGA ALAT

22,531.25
2,253.13
24,784.38
DAFTAR HARGA SATUAN UPAH DAN BAHAN

No URAIAN SAT
1 2 3

I UPAH
1 Mandor HOK
2 Kepala Tukang HOK
3 Tukang HOK
4 Pekerja HOK

No JENIS BARANG SAT

1 2 4

II BAHAN
II.1 AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
Tanah Urug m³
Tanah Merah m³
Pasir Beton Cimalaka m³
Pasir Pasang Cimalaka m³
Pasir Pasang m³
Pasir urug m³
Pasir Batu (sirtu) tersaring m³
Sirtu m³
Abu batu m³
Pasir Aspal m³
Gravel m³
Batu Gosok (Batu Apung) kg
Koral beton / Stoned Crusher/ Batu pecah 1-2 m³
Koral beton / Stoned Crusher/ Batu pecah 2-3 m³
Koral beton / Stoned Crusher/ Batu pecah 3-5 m³
Koral beton / Stoned Crusher/ Batu pecah 5-7 m³
Koral beton / Stoned Crusher/ Batu pecah 7-10 m³
Koral beton / Stoned Crusher/ Batu pecah 10-15 m³
Batu belah untuk pondasi m³
Batu bronjol (untuk Bronjong) m³
Batu koral beton kali m³
Batu tempel hitam m²
Batu pinggir beton 10 x 20 x 35 (Kaanstein) bh
Batu pinggir beton 15 x 35 x 50 ( K-225 ) bh
Batu telor m³
Batako kecil 8 x 10 x 20 bh
Batako besar 8 x 20 x 30 bh
HB 10 x 20 x 40 buah
Batu merah bakar kelas I buah
Batu merah bakar kelas II buah
Batu merah oven (klingker) buah
Roster / krawang 30 x 30 buah
Hollow brick Bh
Bata ringan t = 7,5 cm Bh
Bata ringan t = 10 cm Bh
Paving block segi enam warna, t = 8,00 cm m²
Paving block segi enam natural, t = 8,00 cm m²
Paving block segi enam warna, t = 6,00 cm m²
Paving block segi enam natural, t = 6,00 cm m²
Semen PC 50 kg Kg
Semen putih Kg
Batu Pinggir Beton Kerb Type A M
Batu Pinggir Beton Kerb Type B M
Ready Mix K 125, tanpa pompa ( selang ) m³
Ready Mix K 175, tanpa pompa ( selang ) m³
Ready Mix K 225, tanpa pompa ( selang ) m³
Ready Mix K 250, tanpa pompa ( selang ) m³
Ready Mix K 275, tanpa pompa ( selang ) m³
Ready Mix K 300, tanpa pompa ( selang ) m³
Ready Mix K 350, tanpa pompa ( selang ) m³
Ready Mix K 400, tanpa pompa ( selang ) m³
Ready Mix K 450, tanpa pompa ( selang ) m³
Ready Mix K 500, tanpa pompa ( selang ) m³
Beton Siklop m³
Kapur Pasang/Kapur Tembok kg
Sewa Pompa Ready Mix m³
Material Agregat Kelas A m³
Material Agregat Kelas B m³
batu Kapur pilihan m³
Semen warna kg
Semen Grouting Zak
Mortar siap pakai Kg
Kapur sirih Kg
Screen Kg
Patok Hm buah
Patok Km buah
Gorong-gorong beton tanpa tulang dia. 20 cm m'
Gorong-gorong beton tanpa tulang dia. 30 cm m'
Gorong-gorong beton bertulang dia. dlm 20 cm m'
Gorong-gorong beton bertulang dia. dlm 30 cm m'
Gorong-gorong beton bertulang dia. dlm 45 cm m'
Gorong-gorong beton bertulang dia. dlm 45-75 cm m'
Gorong-gorong beton bertulang dia. dlm 75-95 cm m'
Gorong-gorong beton bertulang dia. dlm 95-120 cm m'
Gorong-gorong beton bertulang dia. dlm 120-150 cm m'
Tiang Pancang (pole) square 25 m'

II.2 BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA


Plamuur / Dempul tembok Kg
Cat tembok ICI Eksterior Gln
Cat tembok ICI untuk interior Gln
Cat tembok Vinilex Kg
Cat tembok Sanlex Kg
Cat tahan asam Kg
Pelapis alkali ICI ( Cat dasar beton eksterior ) ltr
Cat marka / Spotlight Kg
Water Profing Emulsion (Non Toxic) Kg
Water Profing Membrance M
Rol cat tembok bh
Kape tembok bh
Kape kayu bh
Soligneum1 blek 5 ltr
Plincote kg
Pengawetan kayu m³
Pengovenan kayu m³
Kwas 3" bh
Oker putih kg
Oker warna kg
Oyan bks
Oten ( Pewarna Polituur ) bks
Spirtus ltr
Bahan polituur kripik ( Sirlak India ) kg
Dempul lilin kg
Dempul polituur kg
Dempul halus / Infra ( Wood Filler ) kg
Minyak cat / terpentin Lt
Thinner A ltr
Thinner B ltr
Kumpon kg
Melamik Kg
Dempul plastik Kg
Dempul duco Kg
Amplas lbr
Dempul kayu Kg
Menie kayu / besi Kg
Zincromate Kg
Cat kayu Kg
Cat besi Kg
Cat besi duco Danagloss / ICI Kg
Cat Bronze Kg
Cat Digalvanis Kg
Cat Dasar Jembatan Kg
Pelumas lt

II.3 BAHAN KAYU BERIKUT BAHAN JADINYA


Bambu Ø 5 - 8 cm btg
Bambu Ø 8 - 10 cm btg
Bambu gombong btg
Kayu Terentang m³
Kayu Kls II ( Kamper Singkil / Kapur / K. Samarinda ) m³
Kayu balok Borneo Super m³
Kayu papan Borneo super m³
Kayu balok kamper Medan ( kruing ) m³
Kayu papan kamper Medan ( kruing ) m³
Kayu balok kamper Banjar m³
Kayu papan kamper Banjar m³
Kayu balok kamper Samarinda m³
Kayu papan kamper Samarinda m³
Kayu balok Rasamala m³
Kayu jati Jatim tua lepas mata dari dia. 80 cm ke atas m³
Kayu jati Jateng tua lepas mata dari dia. 80 cm ke atas m³
Kayu jati Jabar tua lepas mata dari dia. 80 cm ke atas m³
Kayu jati Jabar dia. 40 cm ke bawah m³
Kayu albasia m³
Dolken 5 / 7 cm btg
Dolken 7 / 10 cm btg
List profil kamper 1 cm m
List profil kamper 2 cm m
List profil kamper 4 cm m
List profil kamper 5 cm m
List profil kamper 10 cm m
Pegangan tangga profil jati m
Pegangan tangga profil kamper m
Kayu reng 2/3 Borneo Super m
Kayu reng 2/3 Kamper Banjar m
Kayu reng 3/4 Kamper Banjar m
Kayu bakar m³
II.4 BAHAN PENUTUP RANGKA PLAFOND
Bahan plafond eternit / Asbes 4 mm m²
Bahan plafond hardpleks 5 mm 120 x 240 lbr
Bahan plafond Asbes Semen 5 mm m²
Gypsum 120 x 240 , t = 9 mm, ex DN lbr
Gypsum 120 x 240 , t = 9 mm, ex Luar lbr
List Gypsum C – 7 Profil m
Acustik Amstrong 60 x 120 m

II.5 BAHAN KAYU LAPIS


Tripleks 3 mm, ( 1,22x2,44 ) lbr
Tripleks 4 mm, ( 1,22x2,44 ) lbr
Tripleks 4 mm, ukuran pintu lbr
Tripleks 6 mm, ( 1,22x2,44 ) lbr
Jabar Wood 4 mm lbr
Bilik bambu ( tanpa kulit ) m²
Bilik bambu ( dengan kulit ) m²
Bilik bambu hitam variasi m²
Wall paper ( kelas menengah ) m²
Multipleks 9 mm, ( 122 x 244 ) lbr
Multipleks 12 mm, ( 122 x 244 ) lbr
Multipleks 15 mm, ( 122 x 244 ) lbr
Multipleks 18 mm, ( 122 x 244 ) lbr
Play Wood 18 mm, ( 122 x 244 ) lbr
Teak Wood 3 mm, (1,22x2,44) lembar
Teak Wood 4 mm, (1,22x2,44) lembar
Teak Wood 3 mm, ukuran pintu lembar
Teak Wood 4 mm, ukuran pintu lembar
Melamin 4 mm 120 x 240 lbr
Melamin TIK 4 mm lbr
Formika 120 x 240 lbr
Formika ukuran pintu lbr

II.6 BAHAN LANTAI DAN PELAPIS DINDING


Teugel PC 20 x 20 bh
Plint teugel PC 10 x 20 bh
Teugel PC 30 x 30 bh
Plint teugel PC 15 x 30 bh
Teugel warna 20 x 20 bh
Plint teugel warna 10 x 20 bh
Teugel warna 30 x 30 bh
Plint teugel warna 15 x 30 bh
Teugel wafel PC 20 x 20 bh
Teugel badak PC 30 x 30 bh
Porselin 11 x 11 cm, Warna Standard ex DN m²
Porselin 11 x 11 cm, Warna Khusus ex DN m²
Keramik 10 x 20 dan 20 x 20 cm ( Kw 1 ), polos/putih ex DN m²
Keramik 10 x 20 cm ( Kw 1 ), corak / warna / anti slip ex DN m²
Keramik 20 x 20 cm ( Kw 1 ), polos/putih ex DN m²
Keramik 20 x 20 cm ( Kw 1 ), Warna/Corak/Anti Slip ex DN m²
Keramik 20 x 25 cm ( Kw 1 ), dinding KM / Corak ex DN m²
Keramik 30 x 30 cm ( Kw 1 ) DN Polos/Putih m²
Keramik 30 x 30 cm ( Kw 1 ) DN Corak/Warna//Anti Slip m²
Keramik 40 x 40 cm ( Kw 1 ) DN Corak/Warna m²
Stairnosing keramik 10 x 20 bh
Stairnosing fiber m
Granit alam ukuran besar ex LN m²
Granit alam ukuran kecil ex LN m²
Granit alam ukuran besar ex DN m²
Granit alam ukuran kecil ex DN m²
Granito Tile Essenza/Polis 40 x 40 cm m²
Granito Tile Essenza/Un Polis 40 x 40 cm m²
Granito Tile Essenza/Polis 60 x 60 cm m²
Granito Tile Essenza/Un Polis 60 x 60 cm m²
Bata Karawang bh
Campuran untuk kedap air (AM) ltr

II.7 BAHAN LOGAM DAN BAHAN JADINYA


Besi Tulangan U-32, Ulir Kg
Besi Tulangan U-39, Ulir Kg
Besi Tulangan U-42, Ulir Kg
Besi Tulangan U-24, Polos Kg
Besi Tulangan U-39 / U-32, Polos Kg
Wire mesh dia 8 mm m²
Wire mesh dia 6 mm m²
IWF Ex DN SII Kg
IWF Ex Jepang Kg
Besi profile DN SII Kg
Besi profile Ex LN Kg
Besi C Lips Chanel Kg
Besi Hollo 4x4 t=0,8mm m
Besi Hollo 4x2 t=0,8mm m
Besi plat Kg
Plat besi tipis 1 mm Kg
Plat besi tipis 0,5 mm Kg
Plat besi 2 mm s/d 5 mm Kg
Plat besi 6 mm s/d 10 mm Kg
Plat besi 10 mm ke atas Kg
Rangka Baja Jembatan Kg
Plat Bondex m²
Kuda-kuda Rangka Baja Ringan (Zinkalum) m²
Kuda-kuda Rangka Baja Ringan (Galvalum) m²
Main truss C75-75 m
Roof batten/Reng R 33-0,45 m
Kusen Alumunium 4” m
Alumunium Daun Pintu/Jendela m
Alumunium Strip m
Alumunium Sheet m²
Jalusi alumunium m
Kawat beton Kg
Kawat duri m
Kawat pengikat m
Kawat bronjong 4 mm Kg
Kawat bronjong 3 mm Kg
Kawat tembaga Kg
Kawat las listrik Kg
Kawat nyamuk M2
Kawat ayak M2
Ram Kawat Baja Galvanized M2
Kawat ayam M2
Kawat bronjong fabrikasi isi 1 M3 Unit
Pagar BRC Lengkap dengan Tiang (tanpa pondasi) m²
Ongkos Galvanized Kg
Sealent Alumunium ke Kaca m
Sealent Alumunium ke Tembok m
Polyuretane Alumuniun ke dinding m
Lem kuning ( aibon ) Kg
Lem fox Kg
Guard Raill m
Sealent Tube
Lem kayu Kg

II.8 BAHAN PAKU DAN MUR BAUT


Paku 1 s/d 3 cm Kg
Paku 4 cm s/d 7 cm Kg
Paku seng 2" Kg
Paku seng warna Kg
Paku fischer Buah
Paku triplek Kg
Paku sekrup Kg
Paku Hak Panjang 15 cm Kg
Besi angkur Buah
Baut mur ø 5/8" Panjang 4" Buah
Baut mur ø 5/8" Panjang 6" Buah
Baut mur ø 5/8" Panjang 8" Buah
Baut mur ø 5/8" Panjang 10" Buah
Baut mur ø 1" Panjang 4" Buah
Baut mur ø 1" Panjang 6" Buah
Baut mur ø 1" Panjang 8" Buah
Mur baut dia. 22 mm Buah
Mur baut dia. 20 mm Buah
Mur baut dia. 16 mm Buah
Fiser dia. 12 s/d 20 cm bh
Skrup Fiser bh
Self drilling screw; dia. 6 - 20 mm (truss screw) bh
Self drilling screw; dia. 4 - 16 mm (roof batten screw) bh
Dinabolt dia. 12 mm (10-15 cm) Buah
Baut mur ø 1" Panjang 10" Buah
Spacer/Tie Rod Buah

II.9 BAHAN PENUTUP ATAP


Seng BJLS 0,2 x 3 x 6 BD 9 Lembar
Seng BJLS 0,3 x 3 x 6 BD 9 Lembar
Seng BJLS 0,2 x 3 x 6 BD 11 Lembar
Seng BJLS 0,3 x 3 x 6 BD 11 Lembar
Seng plat BJLS K.30 Lembar
Atap daun rumbia Lembar
Atap plastik putih acrilic Lembar
Fibre glass Lembar
Atap seng warna, tebal 0,20 11 BD merk Swan Brand Lembar
Atap seng warna, tebal 0,20 11 BD merk Gold Fish Lembar
Atap spandek M2
Genteng metal warna Lembar
Atap genteng beton warna m²
Atap asbes gelombang Lembar
Seng plat BJLS K.20 warna Lembar
Seng super deck warna Lembar
Atap seng warna, tebal 0,20 11 BD merk Swan Brand Lembar
Atap Genteng Plentong Press Bakar KW 1 Buah
Atap Genteng Plentong Press Molen Oven KW 1 Buah
Atap Genteng Kodok Buah
Bubung genteng plentong Buah
Bubung genteng press bulat Buah
Bubung genteng segitiga Buah
Bubung genteng kodok berglazur Buah
Bubung Stel Gelombang Lembar
Bubung Spandek M2
Polycarbonate tebal 5 mm M2
Rooflight 90 x 180 Lembar
Aluminium foil M2
Sabun Kg
Atap Zinc Alum Coateds U 375, 0,30 mm CTC Lbr
Atap Zinc Alum Coateds U 375, 0,35 mm CTC Lbr

II.10 BAHAN KACA


Kaca polos 2 mm M2
Kaca polos 3 mm M2
Kaca polos 5 mm M2
Kaca polos 8 mm M2
Kaca Rayband 5 mm M2
Kaca Rayband 8 mm M2
Kaca Rayband 12 mm M2
Kaca patri lokal ( ASAHI ), terpasang M2
Kaca patri ex luar negri, terpasang M2
Glass Block DN 20 x 20 ( Kedawung ) Buah
Glass Block LN 20 x 20 Buah
Kaca buram 3 mm M2
Kaca buram 5 mm M2
Kaca nako 5 mm, polos Daun
Kaca nako 5 mm, warna Daun

II.11 BAHAN ALAT PENGGANTUNG DAN KUNCI


Kunci silinder ALFA untuk pintu allumunium Buah
Tarikan pintu allumunium Buah
Kunci 2 slaag ROYAL Buah
Rel Handerson lengkap Buah
Rel marathon 1 pintu unit
Kunci 2 slaag silinder SEIS asli type 210 s/d type 226 Buah
Kunci 2 slaag ANCHOR asli Buah
Kunci 2 slaag ISO Buah
Kunci KM bulat kualitas biasa Buah
Kunci KM bulat ALFA Buah
Kunci 2 slaag silinder utama standard Buah
Kunci gembok besar Buah
Kunci 2 slaag Kuda Terbang Buah
Espangolet psg
Grendel 15 cm Buah
Grendel 5 cm psg
Hak angin kait jendela biasa psg
Hak angin jendela antik Buah
Hak angin sendok stainless / kuningan Buah
Nako lengkap tralis 1 daun Buah
Slot pintu berikut rantai Buah
Slot jendela tunggal Buah
Engsel pintu Unilon Standard psg
Engsel jendela Unilon psg

II.12 BAHAN ALAT SANITAIR


Shower Dengan Tiang Buah
Shower Tanpa Tiang Buah
Kraan Tembok Sun Ei Ø 1/2" Buah
1
Kraan Tembok ITAP Ø /2" Buah
Kraan Bebek Sun Ei Ø 1/2" Buah
1
Kraan Bebek ITAP Ei Ø /2" Buah
Kraan Panas Dingin Standard Buah
Tempat Sabun Porselain Buah
Westafel Lengkap LW 230 unit
Westafel Lengkap unit
Closet Jongkok Porselin Warna unit
Closet Jongkok Standard Putih Porselin unit
Closet jongkok merl TOTAL Buah
Closet duduk merk TOTO type CE 7 warna tua Buah
Closet duduk merk TOTO type C warna tua Buah
Closet duduk komplit setara KIA Standar Buah
Washtafel kompek merk KIA type 1207 Buah
Washtafel kompek merk KIA type SUSAN Buah
Urinoir keramik setara KIA standar Buah
Penyekat Porselin lbr
Kitchen Zink stainless steel Standard Lokal ( 1 lobang ) Buah
Kitchen Zink stainless steel Non Standard Franke ( 1 lobang ) Buah
Kitchen Zink stainless steel Non Standard Franke ( 2 lobang ) Buah
Bak mandi fibre glas 60 x 60 x 69 Buah
Bak mandi fibre glas 40 x 45 x 60 Buah
Bak fibre glas 60 x 60 x 60 motif keramik Buah
Bak fibre glas 45 x 45 x 60 motif keramik Buah
Bak air fibre glas kap 1.000 ltr Buah
Bak air fibre glas kap 500 ltr Buah
Floor drain Buah
Pintu fibre lengkap Buah

II.13 BAHAN BOLA LAMPU


Lampu pijar 40 Watt Buah
Lampu pijar 60 Watt Buah
Lampu neon 10 Watt Buah
Lampu neon 20 Watt Buah
Lampu neon 40 Watt Buah
Lampu philip 18 Watt Buah
Lampu philip 14 Watt Buah
Lampu philip 8 Watt Buah

II.14 BAHAN PIPA


A Pipa Steel
dia. 40 mm ( 1½" ) M
dia. 50 mm ( 2" ) M
dia. 75 mm ( 3" ) M
dia. 100 mm ( 4" ) M
dia. 125 mm ( 5" ) M
dia. 150 mm ( 6" ) M
dia. 200 mm ( 8" ) M
dia. 250 mm ( 10" ) M
dia. 300 mm ( 12" ) M
dia. 350 mm ( 14" ) M
dia. 400 mm ( 16" ) M
dia. 450 mm ( 18" ) M
dia. 500 mm ( 20" ) M
dia. 550 mm ( 22" ) M
dia. 600 mm ( 24" ) M
dia. 700 mm ( 28" ) M
dia. 800 mm ( 32" ) M
dia. 900 mm ( 36" ) M
B Pipa Galvanis
ø ½" Batang
ø ¾" Batang
ø 1" Batang
ø 1¼" Batang
ø 1½" Batang
ø 2" Batang
ø 2½" Batang
ø 3" Batang
ø 4" Batang
ø 6" Batang
ø 8" M
ø 10" M
ø 12" M
ø 14" M
C Pipa PVC-12,5 RR / SNI
PIPA PVC S-12,5 RR ; ND 63 mm (2") M
PIPA PVC S-12,5 RR ; ND 90 mm (3") M
PIPA PVC S-12,5 RR ; ND 110 mm (4") M
PIPA PVC S-12,5 RR ; ND 160 mm (6") M
PIPA PVC S-12,5 RR ; ND 200 mm (8") M
PIPA PVC S-12,5 RR ; ND 250 mm (10") M
PIPA PVC S-12,5 RR ; ND 315 mm (12") M
PIPA PVC S-12,5 RR ; ND 355 mm (14") M
PIPA PVC S-12,5 RR ; ND 400 mm (16") M
PIPA PVC S-12,5 RR ; ND 450 mm (18") M
PIPA PVC S-12,5 RR ; ND 500 mm (20") M
PIPA PVC S-12,5 RR ; ND 630 mm (24") M
PIPA PVC S-12,5 RR ; ND 710 mm (28") M
PIPA PVC S-12,5 RR ; ND 800 mm (32") M
PIPA PVC S-12,5 RR ; ND 900 mm (36") M
PIPA PVC S-12,5 RR ; ND 1000 mm (40") M
PIPA PVC S-12,5 RR ; ND 1100 mm (44") M
PIPA PVC S-12,5 RR ; ND 1200 mm (48") M
M
D Pipa PVC- Klas AW
dia. 1" M
dia. 2" M
dia. 3" M
dia. 4" M
E Pipa PVC-SDR 41 - PN 8 / SNI (ISO/DIN 4435)
ND 100 mm (4") M
ND 150 mm (6") M
ND 200 mm (8") M
ND 250 mm (10") M
ND 300 mm (12") M
ND 350 mm (14") M
ND 400 mm (16") M
F Pipa HDPE-SDR 17 - PN 10 / SNI
ND 63 mm (2") M
ND 90 mm (3") M
ND 100 mm (4") M
ND 125 mm (5") M
ND 150 mm (6") M
ND 200 mm (8") M
ND 250 mm (10") M
ND 300 mm (12") M
ND 350 mm (14") M
ND 400 mm (16") M
ND 450 mm (18") M
ND 500 mm (20") M
ND 550 mm (22") M
ND 600 mm (24") M
ND 700 mm (28") M
ND 800 mm (32") M
ND 900 mm (36") M
ND 1000 mm (40") M

Pipa HDPE-SDR 21 - PN 8 / SNI


ND 1200 mm (48") M

G Asesoris Perpipaan
Knie GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Socket GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Tee GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
ø 6" Buah
ø 8" Buah
ø 10" Buah
ø 12" Buah
ø 14" Buah
ø 16" Buah
D. Niple GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Water moor GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Flug GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Dop GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Flok-Soc GI
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Flok-Tee GI
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Flok-Nipple ring GI
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Bend all flange
ø 2" x 90 Buah
ø 3" x 90 Buah
ø 4" x 90 Buah
ø 6" x 90 Buah
ø 8" x 90 Buah
Tee all flange
ø 100 mm ( 4" ) Buah
ø 150 mm ( 6" ) Buah
ø 200 mm ( 8" ) Buah
All reducer flange
ø 3" x 2" Buah
ø 4" x 2" Buah
ø 4" x 3" Buah
ø 6" x 3" Buah
ø 6" x 4" Buah
ø 8" x 4" Buah
ø 8" x 6" Buah
Gate Valve
ø 50 mm ( 2" ) Buah
ø 75 mm ( 3" ) Buah
ø 100 mm ( 4" ) Buah
ø 150 mm ( 6" ) Buah
ø 200 mm ( 8" ) Buah
ø 250 mm ( 10" ) Buah
ø 300 mm ( 12" ) Buah
ø 350 mm ( 14" ) Buah
ø 400 mm ( 16" ) Buah
ø 450 mm ( 18" ) Buah
ø 500 mm ( 20" ) Buah
ø 550 mm ( 22" ) Buah
ø 600 mm ( 24" ) Buah
ø 700 mm ( 28" ) Buah
ø 800 mm ( 32" ) Buah
Loose Flange
ø 40 mm ( 1½" ) Buah
ø 50 mm ( 2" ) Buah
ø 75 mm ( 3" ) Buah
ø 100 mm ( 4" ) Buah
ø 150 mm ( 6" ) Buah
ø 200 mm ( 8" ) Buah
ø 250 mm ( 10" ) Buah
ø 300 mm ( 12" ) Buah
ø 350 mm ( 14" ) Buah
ø 400 mm ( 16" ) Buah
ø 450 mm ( 18" ) Buah
ø 500 mm ( 20" ) Buah
ø 550 mm ( 22" ) Buah
ø 600 mm ( 24" ) Buah
Dop PVC
ø 50 mm ( 2" ) Buah
ø 75 mm ( 3" ) Buah
ø 100 mm ( 4" ) Buah
ø 200 mm ( 8" ) Buah
Tee PVC
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
ø 6" Buah

Bend (RR) PVC


ø 3" x 90 Buah
ø 4" x 45 Buah
ø 6" x 90 Buah
Bend PVC
ø 2" x 40 Buah
ø 4" x 45 Buah
ø 4" x 90 Buah
Flange socket ND 200 Buah
Flange socket ND 150 Buah
Tee all socket ND 150 Buah

Socket draat PVC


ø 2" Buah
ø 3" Buah
ø 6" Buah
Kraan
ø ½" standar Buah
ø ½" setara ONDA Buah
ø ¾" standar Buah
ø ¾" setara ONDA Buah
Water stop tebal 15 mm Buah
Water stop tebal 20 mm Buah
Seal tape Buah
Box steet Buah
II.15 PINTU AIR ANGKAT TEKAN
Pintu angka tekan 0,2 - 04 Unit
Pintu angka tekan > 0,2 - 04 Unit

II.16 PINTU ULIR


Pintu satu ulir > 0,6 - 08 Unit
Pintu satu ulir > 0,8 - 1,0 Unit
Pintu satu ulir > 1,0 - 1,2 Unit
Pintu dua ulir > 1,2 - 1,5 Unit
Pintu dua ulir > 1,5 - 2,4 Unit

II.17 BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


Hotmix ton
Aspal Drum 155 kg kg
Aspal Curah kg
Emulsi Ltr
Aspal Minyak kg

II.18 BAHAN BAKAR MINYAK.PENCAMPUR/OLI


1 Premium Liter
2 Solar Liter
3 Solar industri Liter
4 Kerosen/Minyak tanah industri Liter
5 Kerosen/Minyak tanah Liter
6 Olie Liter
7 Minyak fluks Kaleng

II.19 BAHAN LAIN


Bambu ukuran besar Batang
Bambu ukuran sedang Batang
Bambu ukuran kecil Batang
Ijuk Kg
Tali Ijuk M3
Pilar beton 2,75 x 2,75 M'
Pilar beton 2,75 x 0,25 x 0,25 M'
Trali beton tinggi 0,60 M'
Trali pagar tinggi 0,90 M'
Air bersih ltr
Minyak bekisting ltr
Pasir kwarsa Ton
Gravel antrasit Ton
Paranet M2
N BAHAN

HARGA
4

194,274.00
182,676.00
166,729.00
157,643.00

HARGA

100,000.00
85,000.00
235,000.00
185,000.00
185,000.00
100,000.00
148,000.00
150,000.00
136,000.00
224,130.00
130,000.00
10,580.00
194,250.00
162,750.00
136,500.00
99,750.00
88,812.00
88,812.00
100,000.00
125,000.00
220,000.00
125,000.00
28,600.00
52,400.00
116,450.00
1,400.00
2,000.00
4,250.00
890.00
700.00
3,850.00
4,400.00
3,520.00
16,900.00
22,500.00
88,546.00
69,146.00
65,570.00
53,648.00
1,120.00
2,650.00
77,000.00
102,000.00
1,168,859.00
1,342,631.00
1,681,087.50
1,867,875.00
1,756,627.20
1,951,808.00
2,542,935.00
2,610,158.00
2,513,491.20
2,792,768.00
0.00
2,850.00
105,000.00
317,120.00
304,000.00
110,000.00
10,000.00
267,500.00
3,750.00
7,700.00
12,700.00
206,700.00
260,000.00
98,000.00
121,000.00
168,000.00
190,000.00
330,000.00
550,000.00
586,800.00
1,210,000.00
2,600,000.00
275,000.00

12,800.00
261,800.00
186,700.00
22,000.00
18,000.00
86,900.00
65,000.00
106,700.00
109,700.00
605,000.00
32,000.00
16,500.00
10,000.00
46,000.00
37,300.00
150,000.00
200,000.00
12,500.00
27,500.00
29,700.00
1,250.00
1,250.00
16,500.00
96,000.00
8,250.00
11,500.00
35,000.00
10,000.00
18,000.00
21,000.00
42,700.00
21,000.00
14,500.00
17,500.00
11,600.00
47,000.00
24,200.00
45,200.00
58,000.00
44,700.00
149,400.00
88,000.00
95,200.00
113,850.00
26,700.00

27,500.00
35,200.00
57,700.00
3,025,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,000,000.00
25,000.00
26,400.00
4,200.00
5,800.00
11,000.00
15,500.00
26,000.00
83,500.00
55,000.00
2,500.00
4,500.00
9,000.00
750,000.00

26,500.00
84,000.00
36,500.00
70,000.00
85,000.00
15,000.00
90,700.00

55,000.00
72,000.00
42,000.00
90,000.00
78,000.00
22,000.00
25,000.00
37,500.00
70,000.00
105,000
150,900
172,000
262,900
254,000
92,000.00
115,000.00
80,000.00
98,000.00
110,000.00
125,000.00
120,000.00
109,900.00

2,100.00
2,000.00
2,700.00
2,500.00
2,500.00
2,100.00
2,800.00
2,500.00
1,700.00
2,500.00
47,000.00
54,000.00
46,000.00
51,500.00
56,700.00
88,000.00
78,000.00
88,000.00
84,000.00
98,700.00
12,000.00
14,000.00
1,995,500.00
1,680,600.00
1,500,000.00
1,365,000.00
285,600.00
204,700.00
328,500.00
291,500.00
13,300.00
17,500.00

10,260.00
14,300.00
17,600.00
9,500.00
10,000.00
94,000.00
76,000.00
16,000.00
16,500.00
13,000.00
13,000.00
13,000.00
27,500.00
22,500.00
16,450.00
16,450.00
16,450.00
16,450.00
16,450.00
16,450.00
38,000.00
130,000.00
297,000.00
352,000.00
19,950.00
15,325.00
85,000.00
57,500.00
7,650.00
67,500.00
89,100.00
16,000.00
32,000.00
2,200.00
33,000.00
30,800.00
38,100.00
47,300.00
20,000.00
22,500.00
92,000.00
20,000.00
325,000.00
220,000.00
12,600.00
3,000
3,000
5,500
21,300
14,800
346,800
67,500.00
38,500.00

31,900.00
19,250.00
25,000.00
25,000.00
7,150.00
18,000.00
58,000.00
52,600.00
19,200.00
5,775.00
8,000.00
9,500.00
10,000.00
30,000.00
35,000.00
43,000.00
10,000.00
9,500.00
8,000.00
2,000.00
6,500.00
735.00
625.00
8,750.00
51,000.00
12,500.00

36,000.00
50,000.00
62,000.00
65,000.00
45,000.00
5,000.00
80,000.00
65,000.00
65,835.00
68,970.00
71,550.00
25,000.00
87,150.00
69,250.00
50,000.00
60,000.00
65,835.00
3,850.00
4,150.00
4,600.00
4,850.00
6,300.00
4,350.00
7,150.00
52,000.00
60,000.00
87,250.00
71,250.00
18,750.00
21,750.00
30,000.00
42,000.00

42,800.00
62,500.00
97,000.00
135,500.00
125,000.00
132,000.00
145,000.00
640,000.00
3,338,200.00
25,000.00
38,000.00
98,000.00
125,000.00
25,000.00
35,000.00

379,050.00
379,050.00
107,950.00
758,150.00
235,000.00
336,300.00
200,000.00
162,500.00
117,500.00
98,500.00
488,600.00
110,000.00
75,900.00
63,000.00
40,000.00
15,700.00
40,000.00
120,000.00
75,000.00
35,000.00
75,300.00
25,000.00
68,000.00
48,000.00

924,000.00
525,000.00
150,000.00
115,000.00
250,000.00
212,500.00
300,000.00
80,000.00
900,000.00
750,000.00
415,800.00
412,235.00
284,800.00
325,000.00
1,963,500.00
2,136,750.00
2,136,750.00
2,252,250.00
395,000.00
400,000.00
252,000.00
425,000.00
975,000.00
270,270.00
200,000.00
340,000.00
288,750.00
1,750,000.00
1,501,500.00
250,000.00
225,000.00
15,000.00
35,000.00
30,000.00
30,000.00
66,000.00
65,000.00
45,000.00
35,000.00

36,500.00
57,880.00
123,300.00
194,700.00
243,400.00
392,000.00
497,650.00
924,200.00
1,665,600.00
1,867,800.00
2,388,000.00
4,665,700.00
4,998,800.00
5,376,000.00
5,969,000.00
5,600,000.00
7,500,000.00
8,450,000.00

114,000.00
161,000.00
267,000.00
295,500.00
329,500.00
403,300.00
515,500.00
672,000.00
980,000.00
1,415,000.00
657,000.00
998,000.00
1,360,000.00
2,530,000.00
33,960.00
68,090.00
99,970.00
210,500.00
334,570.00
531,490.00
827,180.00
1,073,620.00
1,209,700.00
1,970,700.00
2,472,300.00
3,996,300.00
5,491,000.00
6,836,000.00
8,257,000.00
9,895,000.00
11,875,000.00
13,125,000.00

11,750.00
27,500.00
48,500.00
73,500.00

65,780.00
127,400.00
195,000.00
310,700.00
483,600.00
569,400.00
786,500.00

48,400.00
98,120.00
146,520.00
186,890.00
305,910.00
477,290.00
742,170.00
1,180,410.00
1,502,380.00
1,898,380.00
2,790,040.00
3,437,280.00
4,319,150.00
5,456,880.00
6,940,780.00
9,407,530.00
11,940,720.00
14,708,100.00

17,242,060.00

6,000.00
8,500.00
12,000.00
15,000.00
17,500.00
22,000.00
45,000.00
65,000.00
110,000.00

5,500.00
7,000.00
9,000.00
11,000.00
13,000.00
16,000.00
32,000.00
51,000.00
76,000.00

8,000.00
12,000.00
15,000.00
22,000.00
28,000.00
48,000.00
84,000.00
152,000.00
250,000.00
664,000.00
1,014,000.00
1,458,000.00
2,026,000.00
2,301,500.00
3,068,600.00

6,000.00
7,000.00
10,000.00
15,000.00
20,000.00
31,000.00
50,000.00
98,000.00
166,000.00

21,000.00
25,000.00
31,000.00
44,000.00
58,000.00
83,000.00
151,500.00
236,000.00
412,000.00

5,000.00
5,500.00
7,500.00
12,000.00
13,000.00
19,500.00
35,000.00
40,000.00
82,000.00

6,000.00
6,000.00
7,500.00
12,000.00
13,000.00
19,000.00
31,000.00
41,000.00
82,000.00
10,500.00
13,000.00
18,000.00
22,000.00
33,000.00
62,000.00
95,000.00
134,000.00

15,000.00
23,000.00
35,000.00
44,000.00
62,000.00
128,000.00
192,000.00
235,000.00

6,500.00
10,000.00
15,000.00
18,000.00
24,000.00
36,000.00
53,000.00
90,000.00

395,000.00
530,000.00
650,000.00
720,000.00
840,480.00

345,000.00
664,000.00
911,000.00

395,000.00
435,000.00
435,000.00
600,000.00
750,000.00
1,180,000.00
1,320,000.00

1,600,000.00
2,943,000.00
4,632,000.00
6,825,000.00
11,193,000.00
15,834,000.00
22,113,000.00
38,304,000.00
56,160,000.00
73,632,000.00
78,000,000.00
87,360,000.00
117,000,000.00
143,565,000.00
189,760,000.00

65,000.00
125,600.00
183,200.00
206,000.00
318,000.00
454,000.00
579,200.00
752,000.00
771,150.00
1,293,600.00
1,387,200.00
2,009,640.00
2,307,720.00
3,000,240.00

44,000.00
64,000.00
120,000.00
435,000.00

7,000.00
9,000.00
11,000.00
27,000.00
30,000.00
57,000.00
144,000.00
142,000.00
170,000.00
285,000.00

170,000.00
240,000.00
185,000.00

60,000.00
160,000.00
180,000.00
756,000.00
475,000.00
285,000.00

25,000.00
45,000.00
79,000.00

25,000.00

31,000.00
95,000.00
117,500.00
13,500.00
275,000.00

3,500,000.00
4,200,000.00

13,500,000.00
17,000,000.00
18,500,000.00
42,000,000.00
46,000,000.00
1,127,300.00
2,166,500.00
11,500.00
12,000.00
15,500.00

7,400.00
8,600.00
10,700.00
8,000.00
8,000.00
19,500.00
15,600.00

55,000.00
35,000.00
17,600.00
17,600.00
264,000.00
291,500.00
258,500.00
52,500.00
400,000.00
125.00
7,500.00
470,000.00
560,000.00
27,500.00
no jenis pekerjaan ukuran
l t
l
1 pek. Direksi keet

ll pek. Tanah dan pondasi


1 pek.pas bouwplank
2 pek.galian tanah untuk pondasi
3 urugan kembali
4 pekejaan pondasi batu kali
5 pekerjaan pondasi telapak
6 pekerjaan pondasi strausspile
7 pek. Pondasi rolag

lll pek. Beton lt1


1 pek. Sloof beton uk 15x20/type sl1 0.15 0.20 0.03
2 pek.Sloof beton uk 15x25/type sl2 0.15 0.25 0.0375
3 pek, kolom beton uk 15x40 0.15 0.40 0.06
4 pek. Kolom praktis uk 12x12/type kp 1 0.12 0.12 0.0144
5 pek.kolom kusen uk 12x10/type kp2 0.12 0.10 0.012
6 pek.poer beton ponds telapak uk 60x60x20 0.60 0.60 0.36
7 pek.poer beton ponds telapak uk 80x80x20 0.80 0.80 0.64
8 pek.ponds strausspile p= 4meter
9 pek. Poer pondasi strausspile
10 pek. Janggutan beton/lisplank beton

IV pek.beton lt 2
1 pek. Balok beton utama uk 15x35
2 pek. Balok beton anak uk 15x25
3 pek.plat lantai bondeck+wiremesh mm8 t=15cm
4 pek.tiang kolom lantai 2
5 pek,kolom kusen
6 pek balok lintel kusen
7 pek.topian beton
8 pek. Ring balok atas dinding/atap
9 pek.janggutan beton/lisplank beton

V pek. Beton lantai dak atap


1 pekerjaan plat lantai dak atap bondeck+wiremesh
2 pekerjaan balok dak
3 pek ring balok ampig
4 pek. Talang beton

Vl pek.pasangan
1 pas.batu belah
2 pas.anstamping
3 pas.dinding bata merah
4 pas.plesteran
5 pas.acian

VII pek. Kusen pintu jendela dan kaca


1 pas.daun pintu kaca sliding untuk pintu masuk
2 pas. Kusen pintu dan jendela alm 3''
3 pas.daun pintu dobel teakwood+kunci+engsel
4 pas.daun pintu pvc untuk km
5 pas.daun jendela
6 pas.bovenlight kaca
7 pas.kaca polos 5 mm

VIII pek.atap
1 pas. Kontruksi atap baja ringan
2 pas. penutup atap genteng metal+alm foil
3 pas.. Bubungan
4 pas,atap canopy polucarbonat rangka besi

IX pek.plafond
1 pas.gypsum 9 mm+rangka holo galvanis
2 pas. List profil

X pek lantai
1 urugan pasir di bawah lantai
2 pluran/lantai kerja
3 pas.keramik uk 40x40 tektur untuk teras depan
4 pas.keramik uk 40x40 polos untuk ruangan
5 pas.keramik uk 40x40 kasar untuk t.jemur
6 pas. Keramik 20x20 kasar untuk lt km
7 pas.keramik 20x25 untuk dindng km , t=3 meter

XI pek.saniter dan pemipaan


A perlengkapan saniter
1 pas. Closet duduk toto type standar lengkap+jet washer
2 pas.shower lengkap
3 pas.kran air dia 1/2 ''
4 pas.floordrain stainless dia 3''

B pek. Instalasi air dan air kotor


1 pas.pipa air bersih pvc dia 1/2'' maspion aw lengkap
2 pas.pipa air bersih pvc dia 3/4'' maspion aw lengkap
3 pas. watertorn kapasitas 1000 liter+radar dll
4 pas.pipa air kotor pvc dia 1 1/4'' maspion aw lengkap
5 pas.pipa air kotor pvc dia 3'' maspion D lengkap
6 pas.pipa air kotor pvc dia 4'''maspion D lengkap
7 pas. septiktank biofil
8 pas. Bak kontrol uk
9 pas. Roof drain dia 3''
10 pas. Stop kran
11 pas. Sumur bor(pompa sibel)
12 pas. Pompa tarik
13 pas.pompa dorong
14 pas.ground tank /bak tampung dari pdam
15 pas.water heater kapsasitas liter

x pek.listrik
1 pas.instalasi titik lampu+out let saklar
2 pas.instalasi stop kontak
3 pas.box sekrung+mcb
4 kabel jalur
5 sambungan listrik pln
6 lampu downlight 4''

Xi pek.pengecatan
1 pengecatan dinding bagian luar/exterior dgn cat dulux
weathersield setara
2 pengecatan dinding bagian dalam/interior dgn vinilex
3 pengecatan dinding samping cat kedap air nodrop
4 pengecatan plafond gypsum dengan vinilex
panjang
balok lintel

pj1 3
pj2 2.2
pj3 1.25
p1 0.7
p2 0.9
j1 1.8
j2 1.35
j3 1.15
j4 2.15
bv 1
volume kaca pj1 1.452
1.669

pj2 0.996
0.802
1.356

pj3 0.75
0.193

0.943

j1 0.665
0.583

j2 1.089
0.608
0.462

j3 0.477
0.335

j4 0.14
1.279
1.032

bv 0.202
LUAS P
VOLUME TANGGA
1.09 M2 0.95

0.68 0.95

1 pekerjaan sloof beton


1m3 beton k-225 1,228,006.81
bekisting sloop 272,867.26
panjang boplank 13.39
22.92
15.34
23.27

74.92 m1

0.20 0.072
0.20 0.128
unit m

3
2.2
11 13.75
11 7.70
2 1.8
1.8
1.35
3 3.45

19 19
0.1 0.15 0.81 m2

54.05 m1
type kusen
pj1
pj2
1.17 pj3
0.9 j1
0.31 j2
j3
j4
2.38 p2
bv

daun jendela pj1


pj2
pj3
j1
j2
j3
j4
p2

atap

bubung

luasan plafond lt1


unit

2 2.904
2 3.338
6.242 1 6.242

2 1.992
0.802
1.356
4.15 1 4.15

20 18.86

4 2.66
2 1.166
3.826 1 3.826

1.089
2 1.216
0.462
2.767 1 2.767

2 0.954
0.335
1.289 3 3.867

3 0.42
2 2.558
1 1.032
4.01 1 4.01

2 0.404 19 7.676
3.25

51.398 m2
M1 1.0355

0.646

1.6815 M3
galian pondasi as b 2.57
1.50
10.24
14.31 14.31

as c 12.53 12.53
as d 12.32 12.32
as e 12.07 12.07
as f 11.82 11.82
as g 11.72 11.72
as h 11.46 11,46 ponds setengah
as 1 21.06 21.06 ponds setengah
as 2 15.73
as 3 15.39
as 4 21.25 pods setengah
benteng dpn 13.4 ponds setengah
1.60
1.35
1.35
1.65
1.35
1.62
1.35
1.64
1.35
1.75
1.35
1.65
1.35
1.35
1.65
1.65
1.35
1.35
2.5
1.65
4.22
1.30

197.98 m1 2 98.99

v batu kali 0.30 0.70 1.00 2 0.50 0.80


0.45 197.98

anstaping 0.105 197.98

rolag 5 0.5 2.5

m3 titik
poer beton 0.80 0.80 0.64 0.3 0.192 6
rospal

p1 0.6 0.6 0.36 0.2 0.072 18


p2 0.8 0.8 0.64 0.2 0.128 8
sl1
sl2 6
12.32
6
11.82
12.11
6
6
panjang sl2 60.25 v= 0.15 0.30 0.045
panjang sl1 137.73 v= 0.15 0.20 0.03

197.98

kolom utama v= 0.15 0.40 0.06

0.15 0.40 0.06


kolom praktis v= 0.15 0.15 0.0225
kolom kusen v= 0.12 0.12 0.0144
luas tebal
plat lantai 80.065 0.15
t jemur 15.75 0.15

balok utama as
b1 a 12.93
b 12.76
c 12.53
d 12.32
e 8.23
f 11.82 dim
g 11.72 0.15 0.35 0.35
h 11.46
1 18.39
2 21.07
3 21.08
4 17.41

m3
171.72 m1 0.35 60.102

balok anak 3.78 0.15 0.25 0.0375


b2 3.51
3.66
3.4
3.95
3.95
3.9
3.9
3.14
1.2
1.2
1.2
3.8
2.85
2
4
3.4
3.15
3.84
4
2.32
4.23
3
2.58
4.02
3.8
2.35
4.15
1.15
4.16
2.54
3.8
2.59
2.59
4.23
2
2.86
3.85
4.39
2.85
0.9

128.19 m1

kolom utama v= 0.15 0.40 0.06


lt2

kp dinding lt2 v= 0.15 0.15 0.0225

kp kusen v= 0.12 0.12 0.0144


lt2

ring balk atap/dinding 11.33 0.15 0.2 0.03


2.88
1.93
1.02
7.4
3.92
3.92
2.24
2.87
8.4
4.32
3.15
13.08
4.13
6.15
6.15
6.15
4.4

93.44

plat lantai 2 231.87 0.15

7.05

224.82 0.15
balok dak atap bd1 5.85 0.15 0.25 0.0375
7.05
5.85
11.74
12.04
11.09
11.1
1

65.72 m1

bd2 11.64 0.15 0.3 0.045


11.9
12.16
2.4

38.1 m1

talang beton 9.4


13.14

22.54 0.15

talang beton 1.2 8.5 10.2


9.4

19.6 0.1 1.96

ring balk ampig 14


12.77
12.77
4.8
4.8
11.47
11.47

72.08 m1 0.15 0.2 0.03

kolom praktis ampig 4.34


3.08

0.15 0.15
topian beton 0.5 4.24

janggutan beton 12.78


1.05
1.05
2.11
2.11
3.8
3.8
m1 26.7 0.15 0.1

p t
pas bata lt1 228.72 m1 3.1
volume kusen lt1
j1 2.5 1.8 4.500
j2 2.5 1.35 3.375
pj1 2.5 3 7.5
j3 1.5 1.15 1.725 224 2.47
pj2 2.5 2.2 5.5 2.79
7.44
22.600 1.57
pj3 2.5 1.25 3.125 9 28.125 4.33
p1 1.95 0.7 1.365 9 12.285
40.410 18.6
22.600

luas volume kusen 63.010 m2

type kusen tiang ambang bwh ambang atas m1


10 3 13 13
7.5 6.28 13.78 13.78
7.5 2.38 9.88 9 88.92
7.5 7.2 14.7 14.7
7.5 4.3 11.8 11.8
3 4.6 7.6 3 22.8
7.5 6.45 13.95
5 2 7 2 14
0.86 2 2.86 19 54.34
2.7
p kusen alm 3'' 247.29 1.15
9.84 3.28 13.12
10.64

6.48
3.12
9.12
5.2

47.68 p daun jendela dan pintu


2.46 4 9.84 p1 daun jendela
1.64 2 3.28

1.28 2 2.56 pj2


0.78 2 1.56
0.8 2 1.6
2.46 2 4.92

10.64

0.78 4 3.12 j1
0.84 4 3.36

6.48

0.78 4 3.12 j2
1.07 2 2.14 j3
0.45 2 0.9

3.04 3 9.12 j3

1.93 2 3.86 j4
0.67 2 1.34

5.2

71 48.64 119.64

8.62 4.1 6.3 2.48 2.48 23.98

1 10.58 7.32 list lt1 14.23 list lt2


2 1.76 1.76 5.35
3 10.53 8.09 14.32
4 1.79 1.79 5.39
5 9.35 8.21 17.54
6 1.8 1.8 5.41
7 8.37 7.21 13.14
8 1.78 8.38 5.38
9 10.2 1.79 16.65
1.53 1.8 4.99
8.79 13.64 13.43
1.79 8.81 5.39
9.36 1.79 13.83
1.79 9.35 5.39
5.59 1.79 9.46
1.68 1.72 5.24
12.59 9.81 15.42
1.71 9.58 5.29
12.69 1.79 15.8
33.92 9.11 32.19
38.14 1.8 31.39
10 11.22
luasan 185.74 1.79
plafond lt1 42.18
10

plafond lt2 181.31 367.05 266.45

PEK.LANTAI LT1/L2 PASIR URUG PLURAN


0.05 303.85 15.1925 0.03

LUAS LANTAI M2

TERAS DEPAN 1.6 40X40 KASAR


RUANGAN LT1 150.85 40X40 158.25
RUANGAN LT2 151.40 40X40

302.25 303.85

LT KM MANDI 15.75 1.75


19.25 1.75

35

DINDING KM 3.2
1 RUANG 3.65
4.57
3.65
15.07

63.49 0.05 3.1745

1/2'' 4
0.7
0.25
7
11.95 20 239 4 59.75

3/4'' 26
13
10
13
8
18
88 4 22

CLOSET 4'' LT1 25 M1 2 50 4

LT2 3'' 38 2 76 M1 4

AIR SABUN 3'' LT1 7


14
4
7
14
4
9

59 M1 4

LT2 26
7
7
26
66 125 4

125 42.5 167.5 4


8
AIR HUJAN3'' 16 175.5
7
3
6
7
3.2
42.2 4

14
5
7
26

stop kontak 21 3 63

65

lampu lt1 45
lt2 51

96

DL4' LT1 20
LT2 26 60 4 240
46 200

DL3'' LT1 18 50 4
LT2 22

40

5 2 10 14 140 m1

280 4 70

250 4 62.5
1 kmr
kabel lt1 13 3.5
8 4
4 6
9 13.5 10 135
34 34
169 2

166 2 332
118

450
118
568

179 2 358
95.12

453.12 2584.088

luas plat lantai bondeck 224.58 2.47


22.12 7.44
2.79
202.46 5.09
4.33

22.12

4 13
4.20
22 0.15 3.3 7 0.4714285714

3.14 0.5 1.57 0.5 0.785

3.14 0.15 0.15 4

3.14 0.15 0.471 0.15 0.07065

0.9 4 3.6

m2
0.40
89.091 m3

20.7879 m3

m3
1.152

1.296
1.024

2.71125
4.1319

tinggi m3 ttk vol


4.45 0.267 32 8.544
8.184
1 0.06 6 0.36
3.35 0.075375 35 2.638125
2.5 0.036 17 0.612

12.00975
2.3625

14.37225
4.807125
tinggi m3 ttk vol
3.35 0.201 32 6.432

3.35 0.075375 43 3.241125

2.5 0.036 13 0.468

2.8032

34.7805

33.723
2.4645

1.7145

3.381

2.1624 titik

4 17.36
4 12.32

0.0225 29.68 0.6678


2.12 0.1 0.212

0.015 0.4005

luas dinding luas kusen


709.032 63.010

plesteran 2
acian

70

2 2584.088

205.4

1.36 4 5.44
0.84

6.28

1.8 4 7.2

1.6 4.3
4 4.6
p daun jendela dan pintu

12.36
5.35
13.03
5.39
16.92
5.41
15.83
13.15
5.39
13.64
5.4 74 3 222 156.000
13.46
5.39
13.83
5.39 1,200.00 70 84,000.00 1200
14.09
5.29
14.2
5.39
14.28
5.39 9 4
13.75
5.39
29.8

257.52 523.97 9 4

150,000.00

303.85 9.1155

6.85 151.40

9 15.75
11 19.25
20 301.4

6.25

19

14.75

16.5

31.25
10.55

16 81

4 50

12.5

2 280

12000 840000
338 m1 13000 4,394,000.00

1292.040 568 724.040

453.12
128

581.12 2002.968
4 3.14

4 0.2826
646.022 m2

646.022 1292.044

18.457771428572
34,632.00

100,800,000.00

36 21 756 2 1512

36 10 360 2 720

108,000,000.00
dimensi
no pekerjaan berat lebar tinggi panjang

1 pek. Sloof uk 15x20 0.15 0.20 1


beton k225 0.15 0.20 1
beton k-225 perm3 sloof
berat besi o 12 0.89 1
berat besi o12 perm3 sloof

besi besi o 8 perkg 0.39 1.3


berat besi o 8 perm3 sloof
bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

2 pek. Sloof uk 15x30 0.15 0.30 1


beton k225 0.15 0.30 1
beton k-225 perm3 sloof
besi besi o 12 0.89 1
berat besi o12 perm3 sloof

besi besi o 8 perkg 0.39 1.3


berat besi o 8 perm3 sloof
bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

3 pek. kolom uk 15x40 (k1) 0.15 0.40 1


beton k225 0.15 0.40 1
beton k-225 perm3 sloof
berat besi o 12 0.89 1
berat besi o 12 perm3 sloof

berat besi o 8 perkg 0.39 1.3


berat besi o 8 perm3 sloof
bekisting

berat besi D16/kg 1.58 1

bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

4 pek. Kolom praktis dinding uk 15x15 (kp1) 0.15 0.15 1


beton k225 0.15 0.15 1
beton k-225 perm3 kolom praktis
berat besi o 12 0.89 1
berat besi o 12 perm3 kolom praktis

berat besi o 8 perkg 0.39 1.3


berat besi o 8 perm3 kolom praktis
bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

5 pek. Kolom praktis kusen uk 15x15 (kp1) 0.12 0.12 1


beton k225 0.12 0.12 1
beton k-225 perm3 kolom praktis
berat besi o 12 0.62 1
berat besi o 12 perm3 kolom praktis
berat besi o 8 perkg 0.39 1.3
berat besi o 8 perm3 kolom praktis
bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

6 pek. balok lintel kusen uk 10x12 (kp2) 0.10 0.12 1


beton k225 0.10 0.12 1
beton k-225 perm3 kolom praktis kusen
berat besi o 10 0.62 1
berat besi o 10 perm3 kolom praktis

berat besi o 8 perkg 0.39 1.3


berat besi o 8 perm3 kolom praktis
bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

8 pek. Janggutan/lisplank beton


beton k225
coran beton

berat besi o8 154.41


p janggutan
7 janggtan beton besi memanjang 0.1 0.15 26.7

besi o 8

begel
0.46 0.2 0.66

kebutuhan besi per cincin/m1 1.32 m1

jumlah cincin 267 bh

202.27273 m1

panjang besi 12

batang 16.856061 17 4.74

besi o 8 154.41 kg

coran 0.4005 m2

8 topian dan talang beton depan 1.62 0.1 4.25

besi o8 jarak 15

pjng
8 melintang 2.44 0.15
memanjang 4.25 0.15

berat perkilo
berat total

berat besi lebat tinggi panjang


9 telapak 80x80x20
type - p2 0.8 0.2 0.8

kebutuhan besi

panjang besi 2m1 2

10 telapak 60x60x20 0.6 0.6 0.2

besi o 12
panjang besi /tirik 1.6 m1 kilo
berat perbatang 10.7 1.3 13.91
berat perkilo 0.89

12.02247

dimensi
no pekerjaan berat lebar tinggi panjang

11 pek. balok utama uk 15x35 0.15 0.35 1


beton k225 0.15 0.35 1
beton k-225 perm3 balok utama
berat besi o 10 perkilo 0.62 1
berat besi o 10 perm3 balok

berat besi o 8 perkg 0.39 1.3


berat besi o 8 perm3 balok

berat besi D13 perkg 1.04 1


berat besi D13 perm3 balok
bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

12 pek. Balok anak uk 15x25 0.15 0.35 1


beton k225 0.15 0.35 1
beton k-225 perm3 balok anak
berat besi o 12 perkilo 0.89 1
berat besi o 12 perm3 balok

berat besi o 8 perkg 0.39 1.3


berat besi o 8 perm3 balok

bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

12 pek. Ring balok atap 15x20 0.15 0.20 1


beton k225 0.15 0.20 1
beton k-225 perm3 balok anak
berat besi o 12 perkilo 0.89 1
berat besi o 12 perm3 balok
berat besi o 8 perkg 0.39 1.3
berat besi o 8 perm3 balok

bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

13 pek.strausspal dia 30cm kedalaman 4 meter


beton k225 (6 buah)
beton k-225 perm3 balok anak
berat besi o 12 perkilo 0.89 4
berat besi o 12 perm3 balok

berat besi o 8 perkg - jarak 15 0.39 8


berat besi o 8 perm3 balok

bekisting

3.15 0.15 0.15

dimensi
no pekerjaan berat lebar tinggi panjang

12 pek. Balok dak 15x25 BD1 0.15 0.25 1


beton k225 0.15 0.25 1
beton k-225 perm3 BD 1
berat besi D 13 perkilo 0.89 1
berat besi D 13 perm3 balok dak

berat besi o 8 perkg 0.39 1.3


berat besi o 8 perm3 balok
berat besi o 10 perkg 0.62 1
berat besi o 10 perm3 balok

bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

12 pek. Balok dak 15x30 BD2 0.15 0.30 1


beton k225 0.15 0.20 1
beton k-225 perm3 BD 1
berat besi D 13 perkilo 0.89 1
berat besi D 13 perm3 balok dak

berat besi o 8 perkg 0.39 1.3


berat besi o 8 perm3 balok

berat besi o 10 perkg 0.62 1


berat besi o 10 perm3 balok

bekisting

dimensi
no pekerjaan berat lebar tinggi panjang

12 pek. TANGGA BETON


beton k225
beton k-225 perm3 BD 1
berat besi O 12 BTNG 26.8
bekisting
harga besi polos
jumlah volume satuan
per kg

0.03 m3 pembagi
0.03 m3
1 m3
4 3.56 kg
118 kg

10 5.07 kg
169 kg
10 m3

harga besi polos


jumlah volume satuan
per kg

0.045 m3 pembagi
0.045 m3
1 m3
6 5.34 kg
118.67 kg

10 5.07 kg
112.67 kg
10 m3

harga besi polos


jumlah volume satuan
per kg

0.06 m3 pembagi
0.06 m3
1 m3
2 1.78 kg
29.67 kg

10 5.07 kg
84.50 kg
10 m3

6 9.48 kg
158
10 m3

harga besi polos


jumlah volume satuan
per kg

0.0225 m3 pembagi
0.0225 m3
1 m3
4 3.56 kg
158.22 kg

10 5.07 kg
225.33 kg
10 m3

harga besi polos


jumlah volume satuan
per kg

0.0144 m3 pembagi
0.0144 m3
1 m3
4 2.48 kg
172.22 kg
10 5.07 kg
352.08 kg
10 m3

harga besi polos


jumlah volume satuan
per kg

0.012 m3 pembagi
0.012 m3
1 m3
4 2.48 kg
206.67 kg

10 5.07 kg
422.50 kg
10 m3

harga besi polos


jumlah volume satuan
per kg

pembagi

1.00
janggutan

p janggutan
0.4005 m2
m1 p/btng btng
7 186.9 12 15.575

2 1.32

jmh cincin
1.32 26.7 0.1 267

cincin
kg
80.58

0.55 0.16 0.16


0.6885

16.26667
28.33333

kilo
45 btng total 4.74 213.3 kilo
0.39
analisa

jumlah volume satuan

0.128 m3 8 bh 1.024

berat/kilo
12 24 m1 2 btng besi 12 0.89

berat perbatang
10.7

12 0.89

titik v beton
0.072 18 1.296 m3

10 16 m1

14.26666667 16.03
kilo

jumlah volume satuan ANALISA

0.0525 m3
0.0525 m3 beton 1,228,006.81
1 m3 besi 10 9,134.13
2 1.24 kg besi 8 7,208.74
23.62 kg besi D13 13,199.73
BEKISTING 433,835.59
10 5.07 kg
96.57 kg
10 m3
5 5.2 m3
99.05 kg
10 kg

jumlah volume satuan ANALISA

0.0525 m3
0.0525 m3 beton 1,228,006.81
1 m3 besi 12 11,293.98
4 3.56 kg besi 8 7,208.74
67.81 kg
BEKISTING 433,835.59
10 5.07 kg
96.57 kg

10 m3

jumlah volume satuan ANALISA

0.03 m3
0.03 m3 beton
1 m3 besi 12 11,293.98
4 3.56 kg besi 8 7,208.74
118.67 kg
BEKISTING 433,835.59
10 5.07 kg
169.00 kg

10 m3

6
jumlah volume satuan ANALISA

1.7010 m3 beton
besi 12 11,293.98
6 21.36 kg besi 8 7,208.74

1 3.12 kg

4 0.2835 24 21.36

jumlah volume satuan ANALISA

0.0375 m3
0.0375 m3 beton 1.00
1 m3 besi 10 11,293.98
5 4.45 kg besi 8 7,208.74
118.67 kg besi D13 13,199.73
BEKISTING 433,835.59
10 5.07 kg
135.20 kg
2 1.24 kg
33.07 kg

10 m3

jumlah volume satuan ANALISA

0.045 m3
0.03 m3 beton 1.00
1 m3 D13 13,199.73
5 4.45 kg besi O 8 7,208.74
98.89 kg besi O 10 9,134.13
BEKISTING 433,835.59
10 5.07 kg
112.67 kg

2 1.24 kg
27.56 kg

10 m3

jumlah volume satuan ANALISA

beton 1.04
O 12
56 1500.8

BEKISTING 433,835.59

12
34 408
1,228,006.81 1,228,006.81

11,293.98 1,332,689.11

7,208.74 1,218,277.15

272,867.26 2,728,672.63

6,507,645.71

- 1,228,006.81

11,293.98 1,340,218.43

7,208.74 812,184.77

272,867.26 2,728,672.63

6,109,082.64
- 1,228,006.81

11,293.98 335,054.61

7,208.74 609,138.58

18,556.62 2,931,945.26
188,654.73 1,886,547.30

6,990,692.55

1,228,006.81

11,293.98 1,786,957.91

7,208.74 1,624,369.54
188,654.73 1,886,547.30

6,525,881.56

1,228,006.81

9,134.13 1,573,099.40
7,208.74 2,538,077.40
188,654.73 1,886,547.30

7,225,730.91

1,228,006.81

9,134.13 1,887,719.28

7,208.74 3,045,692.88
340,235.59 3,402,355.91

9,563,774.88

1,228,006.81

7,208.74 1,113,101.63

433,835.59 433,835.59
2,774,944.03

berat/btng kg
4.74 73.83

1.1 0.47 2.44 m1 pjng besi

2.44 4.25 0.1

2.44 4.25 0.1


bekisting 570,288.73 10.37 m2 5,913,894.13
beton 1,228,006.81 1.037 1,273,443.06
besi 7,208.74 213.8 kilo 1,541,228.73

8,728,565.92

bekisting 570.000 570.00


beton 1,228,006.00 1.024 1,257,478.14
besi 11,293.98 21.36 241,239.41

1,499,287.56

p3 570.000 570.000 570,000


1,228,006.00 1.152 1,414,662.91
11,293.98 24.97 281,973.03

2,266,635.95
0.8 0.8 0.3 0.192 6

28 m1

12 1.3 btang 14.26667 570,000


1,591,495.78
10.7 kilo 161,127.45

2,322,623.22

VOLUME

1,228,006.81
215,739.35
696,158.37
1,307,401.39
433,835.59

3,881,141.50

VOLUME/m3

1,228,006.81
765,839.10
696,158.37

433,835.59

3,123,839.87

VOLUME/m3

1,228,006.81
1,340,218.43
1,218,277.15

433,835.59
4,220,337.98

VOLUME/m3

1,228,006.81
241,239.32
22,491.27

1,491,737.40

VOLUME/m3

1,228,006.81
373,454.12
974,621.72
1,566,367.43
433,835.59

4,576,285.68
VOLUME/m3

1,228,006.81
1,305,306.19
812,184.77
903,263.53
433,835.59

4,682,596.89

VOLUME/m3

1,228,006.81 1,273,443.06
24,784.38 10,112,025.22 besi

433,835.59

1,686,626.77 11,385,468.28

11,819,303.87
1.037
1.152
HARGA SATUAN PEKERJAAN KONSTRUKSI BETON BERTULANG
1 1 M3 COR BETON SITE MIX K.175 ……………………..Analisa 100.37
2 1 M3 COR BETON K.-225 READY MIX MI ……………………..Analisa 100.38
3 1 KG BETON TERPASANG U. 24 ……………………..Analisa 100.43
4 1 KG BESI BETON TERPASANG U. 39 ……………………..Analisa 100.44
5 1 M2 BEKISTING DENGAN PAPAN ……………………..Analisa 100.34
6 1 M2 BEKISTING MULTIPLEX 9 MM ……………………..Analisa 100.35
7 1 M2 PAS. STOOT WERK ……………………..Analisa 100.36
HARGA
NO. URAIAN PEKERJAAN KOEFISIEN SAT
SATUAN (Rp)
1 1M3 PONDASI FOOT PLATE, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 #VALUE!
- Bekisting papan 2.0000 m2 113,630.00
- Besi beton terpasang U.24 180.0000 kg 19,310.00
JUMLAH
2 1M3 SLOOF 15 X 20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting papan 13.3333 m2 113,630.00
- Besi beton terpasang U.24 120.0000 kg 19,310.00
JUMLAH
3 1M3 SLOOF 15 X 25 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting papan 13.3333 m2 113,630.00
- Besi beton terpasang U.24 120.0000 kg 19,310.00
JUMLAH
4 1M3 KOLOM PRAKTIS 12X12 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting papan 16.6667 m2 113,630.00
- Besi beton terpasang U.24 120.0000 kg 19,310.00
JUMLAH
5 1M3 KOLOM TEMBOK 15X20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting Multiplek 9mm 13.3333 m2 106,843.00
- Besi beton terpasang U.24 150.0000 kg 19,310.00
JUMLAH
6 1M3 KOLOM 20X20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting Multiplek 9mm 20.0000 m2 106,843.00
- Besi beton terpasang U.24 150.0000 kg 19,310.00
JUMLAH
7 1M3 BALOK 20X30 CM, READY MIX K.225
- Adukan Beton (Ready Mix K.225) 1.0000 m3 1,045,299.00
- Bekisting Multiplek 9mm 13.3333 m2 106,843.00
- Besi beton terpasang U.24 180.0000 kg 19,310.00
- Pasang Stut Werk 3.3333 m2 305,371.00
JUMLAH
8 1M3 BALOK 12X20 CM, SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting Multiplek 9mm 21.6667 m2 106,843.00
- Besi beton terpasang U.24 150.0000 kg 19,310.00
JUMLAH
9 1M3 RINGBALK 12X20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting papan 16.6667 m2 113,630.00
- Besi beton terpasang U.24 110.0000 kg 19,310.00
JUMLAH
10 1M3 PLAT KANOPI BETON T=7CM, BETON SITE MIX K.75
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting Multiplek 9mm 14.2857 m2 106,843.00
- Besi beton terpasang U.24 100.0000 kg 19,310.00
- Pasang Stut Werk 1.7857 m2 305,371.00
JUMLAH
11 1M3 LANTAI BETON WIREMESH T=15 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Wiremesh M8 1.0000 m2 20,000.00
JUMLAH

analisa beton per m1

1 sloof ukuran 15x20


Jenis Pekerjaan : A.4.1.1.8. Membuat 1m3 Beton Mutu f'₀ = 21,7 Mpa (K-250) Kedap Air, Slump (12 ± 2)

Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)

A TENAGA
- Pekerja L.01 O/H 1.650 157,643.00
- Tukang Bat L.02 O/H 0.275 182,676.00
- Kepala Tuk L.03 O/H 0.028 182,676.00
- Mandor L.04 O/H 1.650 194,274.00
JUMLAH TENAGA KERJA
B BAHAN
- Semen PortM.15 kg 384 56,000.00
- Pasir Beto M.14.a kg 692 235,000.00
- Kerikil M.12 kg 1,039 237,000.00
- Air M.02 liter 215
JUMLAH HARGA BAHAN
C PERALATAN
- Molen kap.E.29.b sewa/hari 0,250
JUMLAH HARGA ALAT

D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
ERTULANG
977,570.00
1,045,299.00
19,310.00
19,547.00
113,630.00
106,843.00
305,371.00

JUMLAH (Rp)

977,570.00
227,260.00
3,475,800.00
4,680,630.00

977,570.00
1,515,066.67
2,317,200.00
4,809,836.67

977,570.00
1,515,066.67
2,317,200.00
4,809,836.67

977,570.00
1,893,833.33
2,317,200.00
5,188,603.33

977,570.00
1,424,573.33
2,896,500.00
5,298,643.33

977,570.00
2,136,860.00
2,896,500.00
6,010,930.00

1,045,299.00
1,424,573.33
3,475,800.00
1,017,903.33
6,963,575.67

977,570.00
2,314,931.67
2,896,500.00
6,189,001.67

977,570.00
1,893,833.33
2,124,100.00
4,995,503.33

977,570.00
1,526,328.57
1,931,000.00
545,305.36
4,980,203.93

977,570.00
20,000.00
997,570.00
a (K-250) Kedap Air, Slump (12 ± 2) cm, w/c = 0.56

Jumlah Harga

(Rp.)

260,110.95
50,235.90
5,114.93
320,552.10
636,013.88

Anda mungkin juga menyukai