HARGA
NO JENIS PEKERJAAN VOLUME SAT SATUAN JUMLAH
(RP) (Rp)
l PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet dan Gudang Bahan 18.00 M2 1,927,751.05 34,699,518.81
2 Pengukuran Site Kembali 264.50 M2 750.00 198,375.00
3 Pembersihan dan perataan Site Kembali 264.50 m2 1,500.000 396,750.00
4 Pasangan Pagar Pengaman Proyek 67.50 M1 530,169.84 35,786,464.07
5 Keamanan 1.00 ls 5,000,000.00 5,000,000.00
JUMLAH - l 76,081,107.88
JUMLAH - lV 257,064,052.46
V PEKERJAAN BETON DAK ATAP
1 Pas. Plat Lantai beton dak atap t=14 cm 74.37 m2 700,000.00 52,059,000.00
2 Pas. Balok dak uk 15x25 type BD1(dak atap) 2.464 m3 4,000,000.00 9,856,000.00
3 Pas. Balok dak uk 15x30 type BD 2(dak atap) 1.714 m3 4,000,000.00 6,856,000.00
JUMLAH V 68,771,000.00
VI PEKERJAAN DINDING
1 Pek. Dinding bata merah 1 : 3 1,100.00 m2 125,000 137,500,000.00
2 Pek. Plesteran 2,200.00 m2 70,000 154,000,000.00
3 Pek. Acian 2,200.00 m2 40,000 88,000,000.00
JUMLAH VI 379,500,000
VII PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pas. pintu sliding dan 2 jendela pintu utama (TYPE PJ1) 1 unit 1 bh 7,500,000.00 7,500,000.00
2 Pas. Kusen pintu, jendela dan bovenlight alm 4''ALEXINDO 247.29 m1 120,000.00 29,674,800.00
3 Pas. Daun pintu dobel teakwood 22 bh 650,000.00 14,300,000.00
4 Pas. Daun pintu pvc untuk km (PVCLUX-KACA ES) 20 bh 518,000.00 10,360,000.00
5 Pas. Bingkai Daun jendela dan pintu 47.68 m1 100,000.00 4,768,000.00
6 Pas. kaca polos 5 mm 51.398 m2 184,884.99 9,502,718.58
JUMLAH VII 76,105,518.58
VIII PEKERJAAN PENUTUP ATAP
1 Pas. Kontruksi Atap Baja Ringan 119.64 m2 150,000.00 17,946,000.00
2 Pas. Penutup Atap Genteng Metal berpasir 119.64 m2 150,000.00 17,946,000.00
3 Pas. Bubungan /nok Genteng Metal 23.89 m1 138,097.00 3,299,137.33
4 Pas. Atap canopy solartuff rangka baja ringan+masang 11.62 m2 450,000.00 5,229,000
5 Pas. Almunium Foil 119.64 m2 25,000.00 2,991,000
JUMLAH VIII 47,411,137
IX PEKERJAAN PLAFOND
1 Pas. Gypsum 9 mm 367.05 m2 77,097.35 28,298,583.20
2 Pas. List profil 10 cm 523.97 m1 7,000.00 3,667,790.00
3 Pas. Rangka Holo 4x4x2 modul 60x60 367.05 m2 137,822.60 50,587,786.54
JUMLAH IX 82,554,159.74
X PEKERJAAN LANTAI
1 Urugan pasir di bawah lantai t=5cm 15.19 m3 44,427.40 674,852.25
2 Pluran/Lantai kerja t=3cm 15.19 m3 71,894.00 1,092,069.86
3 Pas. Keramik tile uk 40x40 tektur untuk teras depan 1.60 m2 293,258.38 469,213.41
4 Pas. Keramik tile uk 40x40 polos untuk ruangan 302.25 m2 287,455.85 86,883,530.66
5 Pas. Keramik tile uk 40x40 tektur untuk t.jemur 14.43 m2 287,455.85 4,147,987.92
6 Pas. Keramik 20x20 tektur untuk Lantai Kamar Mandi 35.00 m2 293,808.35 10,283,292.25
7 Pas. Keramik 20x25 untuk dindng km , t=3 meter 301.40 m2 349,601.45 105,369,877.03
8 Pas. Plin keramik uk 10x40 523.97 m1 70,024.36 36,690,664.43
9 Pas. Paving block carport t= 5cm 73.55 m2 294,262.77 21,643,026.50
JUMLAH X 267,254,514.31
Jenis Pekerjaan : A.2.2.1.1. (K3) Pembuatan 1mPagar Sementara dari Kayu Setinggi 2 m
A TENAGA
- Pekerja L.01 O/H 0.400
- Tukang Kayu L.02 O/H 0.200
- Kepala Tukang L.03 O/H 0.020
- Mandor L.04 O/H 0.020
JUMLAH TENAGA KERJA
B BAHAN
- Dolken Kayu 8-10/400 cm Batang 1.250
- Semen Portland Kg 5.000
- Pasir Beton m3 0.005
- Koral Beton m3 0.009
- Kayu 5/7 m3 0.072
- Paku Biasa 2 - 5 cm Kg 0.060
- Residu Liter 0.400
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 10 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.2.2.1.2. (K3) Pembuatan 1m2 Pagar Sementara dari Seng Setinggi 2 m
A TENAGA
- Pekerja L.01 O/H 0.400
- Tukang Kayu L.02 O/H 0.200
- Kepala Tukang L.03 O/H 0.020
- Mandor L.04 O/H 0.020
JUMLAH TENAGA KERJA
B BAHAN
- Dolken Kayu 8-10/400 cm Batang 1.250
- Semen Portland Kg 2.500
- Seng Gelombang Lbr 1.200
- Pasir Beton m3 0.005
- Koral Beton m3 0.009
- Kayu 5/7 m3 0.072
- Paku Biasa 2 - 5 cm Kg 0.060
- Meni Besi Liter 0.450
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 10 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.100
- Tukang Batu L.02 O/H 0.100
- Kepala Tukang Batu L.03 O/H 0.010
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Balok 5/7 ALBASIA m3 0.012
- Paku 2" - 3" Kg 0.020
- Kayu Papan 2/20 ALBASIA m3 0.007
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 10 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.2.2.1.6. (K3) Pembuatan 1m2 Rumah Jaga ( konstruksi kayu )
No. Uraian Kode Satuan Koefisien
A TENAGA
- Pekerja L.01 O/H 1.000
- Tukang Kayu L.02 O/H 1.500
- Kepala Tukang L.03 O/H 0.150
- Mandor L.04 O/H 0.050
JUMLAH TENAGA KERJA
B BAHAN
- Dolken Kayu 8-10/400 cm Batang 3.000
- Kayu m3 0.276
- Paku Biasa Kg 0.700
- Seng Gelombang Kg 1.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.100
- Mandor L.04 O/H 0.050
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.2.2.1.13. Pembongkaran 1m3 Beton Bertulang
A TENAGA
- Pekerja L.01 O/H 13.334
- Mandor L.04 O/H 0.666
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 6.667
- Mandor L.04 O/H 0.333
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.750
- Mandor L.04 O/H 0.025
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 10 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Catt : Penambahan Galian /1m, koefisien pekerja ditambahkan 0.15, mandor 0.02
Jenis Pekerjaan : A.2.3.1.2. Penggalian 1m3 Tanah Biasa sedalam 2 m
A TENAGA
- Tukang Gali L.01 O/H 0.900
- Mandor L.04 O/H 0.045
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 1.000
- Mandor L.04 O/H 0.032
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
1 UPAH
- Pekerja L.01 O/H 1.500
- Mandor L.04 O/H 0.060
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 1.200
- Mandor L.04 O/H 0.045
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.2.3.1.8. (K3) Pekerjaan Pembuangan 1m3 tanah sejauh 30 m'
1 UPAH
- Pekerja L.01 O/H 0.330
- Mandor L.04 O/H 0.010
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Tukang Gali L.01 O/H 0.500
- Mandor L.04 O/H 0.050
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
- Pekerja L.01 O/H 0.500
- Mandor L.04 O/H 0.050
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.300
- Mandor L.04 O/H 0.010
JUMLAH TENAGA KERJA
B BAHAN
- Pasir Urug m3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.250
- Mandor L.04 O/H 0.025
JUMLAH TENAGA KERJA
B BAHAN
- Sirtu m3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.3.2.1.2. Pemasangan 1m3 Pondasi Batu Belah Campuran 1SP : 4 PP
A TENAGA
- Pekerja L.01 O/H 1.500
- Tukang Batu L.02 O/H 0.750
- Kepala Tukang Batu L.03 O/H 0.075
- Mandor L.04 O/H 0.075
JUMLAH TENAGA KERJA
B BAHAN
- Batu Belah m3 1.200
- Semen Portland ( 50 kg ) Kg 163.000
- Pasir Pasang m3 0.520
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.3.2.1.10. Pemasangan 1m3 Pondasi Siklop 60 % Beton Camp. 1:2:3 dan 40 % Batu Belah
A TENAGA
- Pekerja L.01 O/H 3.400
- Tukang Batu L.02 O/H 0.850
- Kepala Tukang Batu L.03 O/H 0.085
- Mandor L.04 O/H 0.170
JUMLAH TENAGA KERJA
2 BAHAN
- Batu Belah m3 0.480
- Semen Portland ( 50 kg ) Kg 194.000
- Pasir Beton m3 0.312
- Kerikil m3 0.468
- Besi Beton (Besi Polos) Kg 126.000
- Kawat Beton Kg 1.800
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.1.1.1. Membuat 1m3 Beton Mutu f'₀ = 7.4 Mpa (K-100), Slump (12 ± 2) cm, w/c = 0.87
A TENAGA
- Pekerja L.01 O/H 1.650
- Tukang Batu L.02 O/H 0.275
- Kepala Tukang Batu L.03 O/H 0.028
- Mandor L.04 O/H 0.083
JUMLAH TENAGA KERJA
2 BAHAN
- Semen Portland Kg 247.000
- Pasir Beton m3 0.517
- Kerikil (maks = 30 mm) m3 0.740
- Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.1.1.2. Membuat 1m3 Beton Mutu f'₀ = 9.8 Mpa (K-125), Slump (12 ± 2) cm, w/c = 0.78
A TENAGA
- Pekerja L.01 O/H 1.650
- Tukang Batu L.02 O/H 0.275
- Kepala Tukang Batu L.03 O/H 0.028
- Mandor L.04 O/H 0.083
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland Kg 276.000
- Pasir Beton m3 0.493
- Kerikil m3 0.750
- Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3 - 6) cm, w
A TENAGA
- Pekerja L.01 O/H 1.200
- Tukang Batu L.02 O/H 0.200
- Kepala Tukang Batu L.03 O/H 0.020
- Mandor L.04 O/H 0.060
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland Kg 247.000
- Pasir Beton m3 0.517
- Kerikil m3 0.740
- Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.1.1.7. Membuat 1m3 Beton Mutu f'₀ = 19.3 Mpa (K-225), Slump (12 ± 2) cm, w/c = 0.5
A TENAGA
- Pekerja L.01 O/H 1.650
- Tukang Batu L.02 O/H 0.275
- Kepala Tukang Batu L.03 O/H 0.028
- Mandor L.04 O/H 0.083
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland Sak 371.000
- Pasir Beton m3 0.415
- Kerikil m3 0.776
- Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : 4.1.1.19. Pemasangan 10 kg Jaring Kawat Baja ( Wiremesh ) M6
A TENAGA
- Pekerja L.01 O/H 0.025
- Tukang Besi L.02 O/H 0.025
- Kepala Tukang Batu/Besi L.03 O/H 0.025
- Mandor L.04 O/H 0.001
JUMLAH TENAGA KERJA
B BAHAN
- Jaring Kawat Baja dilas Kg 10.200
- Kawat Beton Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.520
- Tukang Kayu L.02 O/H 0.260
- Kepala Tukang L.03 O/H 0.026
- Mandor L.04 O/H 0.026
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.040
- Paku 5 " - 10" Kg 0.300
- Minyak Bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.520
- Tukang Kayu L.02 O/H 0.260
- Kepala Tukang L.03 O/H 0.026
- Mandor L.04 O/H 0.026
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.045
- Paku 5 " - 10" Kg 0.300
- Minyak Bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.660
- Tukang Kayu L.02 O/H 0.330
- Kepala Tukang L.03 O/H 0.033
- Mandor L.04 O/H 0.033
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.040
- Paku 5 " - 10" Kg 0.400
- Minyak Bekisting Liter 0.200
- Balok Kayu Kls II m3 0.015
- Playwood tebal 9mm Lbr 0.350
- Dolken Kayu 8-10m Panj-4m btg 2.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.660
- Tukang Kayu L.02 O/H 0.330
- Kepala Tukang L.03 O/H 0.033
- Mandor L.04 O/H 0.033
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.040
- Paku 5 " - 10" Kg 0.400
- Minyak Bekisting Liter 0.200
- Balok Kayu Kls II m3 0.018
- Playwood tebal 9mm Lbr 0.350
- Dolken Kayu 8-10m Panj-4m btg 2.000
JUMLAH HARGA
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.660
- Tukang Kayu L.02 O/H 0.330
- Kepala Tukang L.03 O/H 0.033
- Mandor L.04 O/H 0.033
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III m3 0.040
- Paku 5 " - 10" Kg 0.400
- Minyak Bekisting Liter 0.200
- Balok Kayu Kls II m3 0.018
- Playwood tebal 9mm Lbr 0.350
- Dolken Kayu 8-10m Panj-4m btg 6.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : 4.1.1.35. Membuat 1 m' Kolom Praktis Bertulang (11 x 11) cm
A TENAGA
- Pekerja L.01 O/H 0.180
- Tukang Batu L.02 O/H 0.020
- Tukang Kayu L.02 O/H 0.020
- Tukang Besi L.02 O/H 0.020
- Kepala Tukang L.03 O/H 0.006
- Mandor L.04 O/H 0.009
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III (Papan) m3 0.002
- Paku 5 " - 10" Kg 0.010
- Minyak Bekisting Ltr 1.200
- Besi Beton Polos Kg 3.000
- Kawat Beton Kg 0.450
- Semen Portland Kg 4.000
- Pasir Beton m3 0.006
- Krikil m3 0.009
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : 4.1.1.36. Membuat 1 m' Ring Balok Beton Bertulang (10 x 15) cm
A TENAGA
- Pekerja L.01 O/H 0.297
- Tukang Batu L.02 O/H 0.033
- Tukang Kayu L.02 O/H 0.033
- Tukang Besi L.02 O/H 0.033
- Kepala Tukang L.03 O/H 0.010
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Kayu Kls III (Papan) m3 0.003
- Paku 5 " - 10" Kg 0.020
- Minyak Bekisting Ltr 1.200
- Besi Beton Polos Kg 3.600
- Kawat Beton Kg 0.050
- Semen Portland Kg 5.500
- Pasir Beton m3 0.009
- Krikil m3 0.015
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.060
- Tukang Las L.02 O/H 0.060
- Kepala Tukang L.03 O/H 0.006
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KERJA
B BAHAN
- Besi Profil Kg 1.150
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.060
- Tukang Las L.02 O/H 0.060
- Kepala Tukang L.03 O/H 0.006
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KERJA
B BAHAN
- Besi Baja IWF Kg 1.150
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.004
- Tukang L.02 O/H 0.002
- Kepala Tukang L.03 O/H 0.000
- Mandor L.04 O/H 0.000
JUMLAH TENAGA KERJA
B BAHAN
- Kawat las listrik kg 0.040
- Bahan bakar solar ltr 0.030
- Pelumas ltr 0.004
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22)cm, Tebal 1 Bata Campuran 1SP
A TENAGA
- Pekerja L.01 O/H 0.600
- Tukang Batu L.02 O/H 0.200
- Kepala Tukang Batu L.03 O/H 0.020
- Mandor L.04 O/H 0.030
JUMLAH TENAGA KERJA
B BAHAN
- Bata Merah m2 140.000
- Semen Portland ( 50 kg ) Kg 43.500
- Pasir Pasang m3 0.080
JUMLAH HARGA BAHAN
C PERALATAN
Jenis Pekerjaan : A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22)cm, Tebal 1 Bata Campuran 1SP
A TENAGA
- Pekerja L.01 O/H 0.600
- Tukang Batu L.02 O/H 0.200
- Kepala Tukang Batu L.03 O/H 0.020
- Mandor L.04 O/H 0.030
JUMLAH TENAGA KERJA
B BAHAN
- Bata Merah buah 140.000
- Semen Portland ( 50 kg ) Kg 26.550
- Pasir Pasang m3 0.093
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.4.1.7. Pemasangan 1m2 dinding bata merah (5x11x22)cm, Tebal 1/2 Bata Campuran 1
A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.100
- Kepala Tukang Batu L.03 O/H 0.010
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Bata Merah buah 70.000
- Semen Portland ( 50 kg ) Kg 18.950
- Pasir Pasang m3 0.038
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm, Tebal 1/2 Bata Campuran 1
A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.100
- Kepala Tukang Batu L.03 O/H 0.010
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Bata Merah buah 70.000
- Semen Portland ( 50 kg ) Kg 14.370
- Pasir Pasang m3 0.040
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.4.1.9. Pemasangan 1m2 dinding bata merah (5x11x22)cm, Tebal 1/2 Bata Campuran 1
A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.100
- Kepala Tukang Batu L.03 O/H 0.010
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Bata Merah buah 70.000
- Semen Portland ( 50 kg ) Kg 11.500
- Pasir Pasang m3 0.043
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.150
- Kepala Tukang Batu L.03 O/H 0.015
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland ( 50 kg ) Kg 10.224
- Pasir Pasang m3 0.020
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.150
- Kepala Tukang Batu L.03 O/H 0.015
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland ( 50 kg ) Kg 6.240
- Pasir Pasang m3 0.024
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.4.2.26. Pemasangan 1m2 Finishing Siar Pasangan Batu Kali Campuran 1SP : 2 PP
A TENAGA
- Pekerja L.01 O/H 0.300
- Tukang Batu L.02 O/H 0.150
- Kepala Tukang Batu L.03 O/H 0.015
- Mandor L.04 O/H 0.015
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland ( 50 kg ) Kg 6.340
- Pasir Pasang m3 0.012
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.200
- Tukang Batu L.02 O/H 0.100
- Kepala Tukang Batu L.03 O/H 0.010
- Mandor L.04 O/H 0.010
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland ( 50 kg ) Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.4.2.28. Pemasangan 1m2 Plesteran Beton Campuran 1SP : 2 PP Tebal 15 mm
A TENAGA
- Pekerja L.01 O/H 0.260
- Tukang Batu L.02 O/H 0.200
- Kepala Tukang Batu L.03 O/H 0.020
- Mandor L.04 O/H 0.013
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland ( 50 kg ) Kg 8.300
- Pasir Pasang m3 0.018
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.700
- Tukang Batu L.02 O/H 0.350
- Kepala Tukang Batu L.03 O/H 0.035
- Mandor L.04 O/H 0.035
JUMLAH TENAGA KERJA
B BAHAN
- Batu temple hitam Bh 1.100
- Semen Portland ( 50 kg ) Sak 11.750
- Pasir Pasang m3 0.035
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.120
- Tukang Kayu L.02 O/H 0.060
- Kepala Tukang L.03 O/H 0.006
- Mandor L.04 O/H 0.006
JUMLAH TENAGA KERJA
B BAHAN
- Atap Polycarbonate m2 1.000
- Paku skrup kg 0.346
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.250
- Tukang Cat L.02 O/H 0.225
- Kepala Tukang L.03 O/H 0.0225
- Mandor L.04 O/H 0.0075
JUMLAH TENAGA KERJA
B BAHAN
- Manie Besi Kg 0.100
- Pengencer Liter 0.010
- Kuwas Bh 0.010
- Perancah kayu M3 0.002
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis
A TENAGA
- Pekerja L.01 O/H 0.250
- Tukang Cat L.02 O/H 0.250
- Kepala Tukang L.03 O/H 0.025
- Mandor L.04 O/H 0.0013
JUMLAH TENAGA KERJA
B BAHAN
- Menie A Kg 0.100
- Menie B Kg 0.100
- Cat Kg 0.080
- Kuwas Bh 0.010
- Pengencer Ltr 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.7.1.19. Pengecatan 1m2 Permukaan Baja Galvanis Secara Manual sistem 1 Lapis Cat M
A TENAGA
- Pekerja L.01 O/H 0.060
- Tukang Cat L.02 O/H 0.060
- Kepala Tukang L.03 O/H 0.012
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KERJA
B BAHAN
- Cat Kg 0.300
- Kuwas Bh 0.010
- Pengencer Ltr 0.010
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.105
- Tukang Pipa L.02 O/H 0.053
- Mandor L.04 O/H 0.011
JUMLAH TENAGA KERJA
B BAHAN
- Pipa PVC Dia 110 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripod/Tackel & Hari 0.010
Handle Crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.118
- Tukang Pipa L.02 O/H 0.059
- Mandor L.04 O/H 0.012
JUMLAH TENAGA KERJA
B BAHAN
- Pipa PVC Dia 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripod/Tackel & Hari 0.012
Handle Crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.189
- Tukang Pipa L.02 O/H 0.095
- Mandor L.04 O/H 0.019
JUMLAH TENAGA KERJA
B BAHAN
- Pipa PVC Dia 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripod/Tackel & Hari 0.024
Handle Crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.256
- Tukang Pipa L.02 O/H 0.128
- Mandor L.04 O/H 0.026
JUMLAH TENAGA KERJA
B BAHAN
- Pipa PVC Dia 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripod/Tackel & Hari 0.034
Handle Crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.294
- Tukang Pipa L.02 O/H 0.147
- Mandor L.04 O/H 0.029
JUMLAH TENAGA KERJA
B BAHAN
- Pipa PVC Dia 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripod/Tackel & Hari 0.040
Handle Crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.400
- Tukang Pipa L.02 O/H 0.200
- Mandor L.04 O/H 0.040
JUMLAH TENAGA KERJA
B BAHAN
- Pipa GIP Dia 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.506
- Tukang Pipa L.02 O/H 0.253
- Mandor L.04 O/H 0.051
JUMLAH TENAGA KERJA
B BAHAN
- Pipa GIP Dia 150 mm m
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.796
- Tukang Pipa L.02 O/H 0.398
- Mandor L.04 O/H 0.080
JUMLAH TENAGA KERJA
B BAHAN
- Pipa GIP Dia 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.949
- Tukang Pipa L.02 O/H 0.475
- Mandor L.04 O/H 0.095
JUMLAH TENAGA KERJA
B BAHAN
- Pipa GIP Dia 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.958
- Tukang Pipa L.02 O/H 0.479
- Mandor L.04 O/H 0.096
JUMLAH TENAGA KERJA
B BAHAN
- Pipa GIP Dia 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.579
- Tukang Pipa L.02 O/H 0.116
- Mandor L.04 O/H 0.058
JUMLAH TENAGA KERJA
B BAHAN
- Pipa Baja Æ 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel dan Handle Hari 0.004
Crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.708
- Tukang Pipa L.02 O/H 0.142
- Mandor L.04 O/H 0.071
JUMLAH TENAGA KERJA
B BAHAN
- Pipa Baja Æ 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel dan Handle Hari 0.004
Crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 1.113
- Tukang Pipa L.02 O/H 0.223
- Mandor L.04 O/H 0.111
JUMLAH TENAGA KERJA
B BAHAN
- Pipa Baja Æ 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel dan Handle Hari 0.004
Crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 1.429
- Tukang Pipa L.02 O/H 0.715
- Mandor L.04 O/H 0.143
JUMLAH TENAGA KERJA
B BAHAN
- Gate Valve dia 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel & Hari 0.100
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 1.714
- Tukang Pipa L.02 O/H 0.857
- Mandor L.04 O/H 0.171
JUMLAH TENAGA KERJA
B BAHAN
- Gate Valve dia 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel & Hari 0.300
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.106
- Tukang Pipa L.02 O/H 0.053
- Mandor L.04 O/H 0.011
JUMLAH TENAGA KERJA
B BAHAN
- Tee dia 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel & Hari 0.028
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.216
- Tukang Pipa L.02 O/H 0.108
- Mandor L.04 O/H 0.022
JUMLAH TENAGA KERJA
B BAHAN
- Tee dia 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
- Sewa Tripot/Tackel & Hari 0.029
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.0080
- Mandor L.04 O/H 0.0008
JUMLAH TENAGA KERJA
B BAHAN
- Air test (air bersih) m3 0.0177
- Bahan bakar Liter 0.0600
- Oli Liter 0.0020
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.0080
- Mandor L.04 O/H 0.0008
JUMLAH TENAGA KERJA
B BAHAN
- Air test (air bersih) m3 0.0314
- Bahan bakar Liter 0.0600
- Oli Liter 0.0020
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.8.4.5.6 (K3) Pemasangan Box Curvert (BC 1x1 meter) saluran tertutup
A TENAGA
- Pekerja L.01 O/H 0.2000
- Tukang L.02 O/H 0.0700
- Kepala Tukang L.03 O/H 0.0200
- Mandor L.04 O/H 0.0150
JUMLAH TENAGA KERJA
B BAHAN
- Box Curvert Buah 1.0000
JUMLAH HARGA BAHAN
C PERALATAN
- Escavator 80-140 HP jam 0.531
PC 100 JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.0080
- Mandor L.04 O/H 0.0008
JUMLAH TENAGA KERJA
B BAHAN
- Pasir Urug m3 0.0780
A TENAGA
- Pekerja L.01 O/H 0.2000
- Tukang L.02 O/H 0.0700
- Kepala Tukang L.03 O/H 0.0200
- Mandor L.04 O/H 0.0150
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.750
- Tukang Batu L.02 O/H 0.250
- Kepala Tukang Batu L.03 O/H 0.025
- Mandor L.04 O/H 0.075
JUMLAH TENAGA KERJA
B BAHAN
- Besi Beton dia 12 mm m 30
- Baja Profil L 40 . 40 . 4 m 4
- Dynabolt/Rammset dia 8 mm buah 21
tiap 20 cm
JUMLAH HARGA BAHAN
C PERALATAN
- Alat las listrik/Diesel E22 SEWA 0.150
- Bor Listrik TO.03 SEHARI 0.020
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.1.1.8. Membuat 1m3 Beton Mutu f'₀ = 21,7 Mpa (K-250) Kedap Air, Slump (12 ± 2) cm
A TENAGA
- Pekerja L.01 O/H 1.650
- Tukang Batu L.02 O/H 0.275
- Kepala Tukang Batu L.03 O/H 0.028
- Mandor L.04 O/H 1.650
JUMLAH TENAGA KERJA
B BAHAN
- Semen Portland M.15 kg 384
- Pasir Beton M.14.a kg 692
- Kerikil M.12 kg 1,039
- Air M.02 liter 215
JUMLAH HARGA BAHAN
C PERALATAN
- Molen kap. 0,3 m3 E.29.b sewa/hari 0,250
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.0070
- Tukang Besi L.02 O/H 0.0070
- Kepala Tukang Besi L.03 O/H 0.0007
- Mandor L.04 O/H 0.0004
JUMLAH TENAGA KERJA
B BAHAN
- Besi Beton(Polos/Ulir) M.55.d kg 1.05
- kawat Ikat M.67 kg 0.0150
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : 1m2 Bekisting Pondasi Dan Sloof Beton Biasa Dengan Menggunakan Papan 3x20 cm
A TENAGA
- Pekerja L.01 O/H 0,300
- Tukang Batu L.02 O/H 0,150
- Kepala Tukang Batu L.03 O/H 0,015
- Mandor L.04 O/H 0,030
JUMLAH TENAGA KERJA
B BAHAN
- papan 3x20cm kayu klas 11 M.35.e lbr 0,014
- kaso 5/7 M.37.a m3 0,009
- Paku 5cm dan Paku 7cm M.71.b kg 0,3
- Minyak Bekisting M.129 L 0,2
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : Bongkar 1m2 Bekisting Secara Biasa(membersihkan dan membereskan puing-puing)
A TENAGA
- Pekerja L.01 O/H 0,040
- Mandor L.04 O/H 0,004
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : Pengecatan 1m2 Permukaan baja Galvanis Secara Manual Sistim 1 lapis cat Mutakhir unt
A TENAGA
- Pekerja L.01 O/H 0,06
- Tukang Cat L.02 O/H 0,06
- Kepala Tukang L.03 O/H 0,012
- Mandor L.04 O/H 0,003
JUMLAH TENAGA KERJA
B BAHAN - Cat Kg 0,30
- kwas buah 0,01
- Pengencer L 0,01
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : Pemasangan pipa Galvanis Diameter 2'' untuk reling Jalan Setapak
A TENAGA
- Pekerja L.01 O/H 0,135
- Tukang Besi L.02 O/H
- Kepala Tukang L.03 O/H
- Mandor L.04 O/H
JUMLAH TENAGA KERJA
B BAHAN - Pipa Galvanis dia 2'' M 1,20
- Perlengkapan % 35,00
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : Pemasangan pipa Galvanis Diameter 2'' untuk reling Jalan Setapak
A TENAGA
- Pekerja L.01 O/H 0,135
- Tukang Besi L.02 O/H
- Kepala Tukang L.03 O/H
- Mandor L.04 O/H
JUMLAH TENAGA KERJA
B BAHAN - Pipa Galvanis dia 2'' M 1,20
- Perlengkapan % 35,00
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.2.1.1.(K3) Pemasangan 1kg besi profil (UNP 200) Grill saluran
A TENAGA
- Pekerja L.01 O/H 0.0600
- Tukang las Konstruksi L.03 O/H 0.0600
- Kepala Tukang L.03 O/H 0.0060
- Mandor L.04 O/H 0.0030
JUMLAH TENAGA KERJA
B BAHAN
- baja UNP 200 m3 1.0000
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.1000
- Tukang las Konstruksi L.03 O/H 0.1000
- Kepala Tukang L.03 O/H 0.0010
- Mandor L.04 O/H 0.0050
JUMLAH TENAGA KERJA
B BAHAN
- Solar Liter 1.0000
- Minyak Pelumas Liter 0.1000
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.0400
- Tukang las Konstruksi L.03 O/H 0.0200
- Kepala Tukang L.03 O/H 0.0020
- Mandor L.04 O/H 0.0020
JUMLAH TENAGA KERJA
B BAHAN
- Kawat Las Listrik Liter 0.4000
- Solar Liter 0.3000
- Minyak Pelumas Liter 0.0400
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Alat jam 0.170
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
TENAGA
- Pekerja L.01 O/H 0.0400
- Mandor L.04 O/H 0.0020
JUMLAH TENAGA KERJA
BAHAN
- Pasir Urug m3 0.4000
JUMLAH HARGA BAHAN
PERALATAN
Sewa Alat jam 0.170
JUMLAH HARGA ALAT
Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D) 10%
Harga Satuan Pekerjaan (D + E)
Pekerjaan : A.4.1.1.7. Membuat 1m3 Beton Mutu f'₀ = 31,2 Mpa (K-350) Kedap Air, Slump (12 ± 2) cm
TENAGA
- Pekerja L.01 O/H 2.100
- Tukang Batu L.02 O/H 0.350
- Kepala Tukang Batu L.03 O/H 0.035
- Mandor L.04 O/H 0.210
JUMLAH TENAGA KERJA
BAHAN
- Semen Portland Kg 448.000
- Pasir Beton m3 0.667
- Kerikil m3 1.000
- Air Liter 215.000
JUMLAH HARGA BAHAN
PERALATAN
Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D) 10%
Harga Satuan Pekerjaan (D + E)
TENAGA
- Pekerja L.01 O/H 0.660
- Tukang Kayu L.02 O/H 0.330
- Kepala Tukang L.03 O/H 0.033
- Mandor L.04 O/H 0.033
JUMLAH TENAGA KERJA
BAHAN
- Multiflex 18 mm M.39.d lbr 0.128
- kaso 5,7 M.37.a m3 0.007
- Paku 5cm dan Paku 7cm M.71.b kg 0.30
- Minyak Bekisting M.129 L 0.20
JUMLAH HARGA BAHAN
PERALATAN
Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D) 10%
A TENAGA
- Pekerja L.01 O/H 0.025
- Tukang Besi L.02 O/H 0.025
- Kepala Tukang Batu/Besi L.03 O/H 0.025
- Mandor L.04 O/H 0.001
JUMLAH TENAGA KERJA
B BAHAN
- Jaring Kawat Baja dilas Kg 10.200
- Kawat Beton Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.043
- Tukang Khusus alm L.03 O/H 0.043
- Kepala Tukang Batu/Besi L.03 O/H 0.043
- Mandor L.04 O/H 0.021
JUMLAH TENAGA KERJA
B BAHAN
- profil almunium Kg 10.200
- sekruf fisher Kg 0.050
- sealent tube 0.060
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.043
- Tukang alm/kaca L.03 O/H 0.043
- Kepala Tukang Batu/Besi L.03 O/H 0.043
- Mandor L.04 O/H 0.021
JUMLAH TENAGA KERJA
B BAHAN
- pintu almunium m 4.400
- kaca m 4.500
- sealent tube 0.270
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.700
- Tukang batu L.02 O/H 0.350
- Kepala Tukang Batu/Besi L.03 O/H 0.035
- Mandor L.04 O/H 0.035
JUMLAH TENAGA KERJA
B BAHAN
- keramik 40x40 bh 6.630
- semen portland kg 9.800
- semen warna kg 0.600
- pasir pasang m3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.4.3.36. Pemasangan 1m2 lantai keramik uk 20cmx20cm kamar mandi
A TENAGA
- Pekerja L.01 O/H 0.700
- Tukang batu L.02 O/H 0.350
- Kepala Tukang Batu/Besi L.03 O/H 0.035
- Mandor L.04 O/H 0.035
JUMLAH TENAGA KERJA
B BAHAN
- keramik 20x20 doos 1.050
- semen portland kg 10.400
- semen warna kg 1.000
- pasir pasang m3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
Jenis Pekerjaan : A.4.4.3.54. Pemasangan 1m2 dinding keramik uk 20cmx25cm kamar mandi
A TENAGA
- Pekerja L.01 O/H 0.900
- Tukang batu L.02 O/H 0.450
- Kepala Tukang Batu/Besi L.03 O/H 0.045
- Mandor L.04 O/H 0.045
JUMLAH TENAGA KERJA
B BAHAN
- keramik 20x20 buah 20.000
- semen portland kg 9.300
- semen warna kg 1.940
- pasir pasang m3 0.018
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.090
- Tukang batu L.02 O/H 0.090
- Kepala Tukang Batu L.03 O/H 0.035
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- plin 10x40 buah 2.50
- semen portland kg 1.140
- semen warna kg 0.025
- pasir pasang m3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.4.3.64. Pemasangan 1m2 Paving Block natural t= 6cm carport
A TENAGA
- Pekerja L.01 O/H 0.250
- Tukang batu L.02 O/H 0.500
- Kepala Tukang Batu/Besi L.03 O/H 0.050
- Mandor L.04 O/H 0.001
JUMLAH TENAGA KERJA
B BAHAN
- paving block 6cm m2 1.010
- pasir beton m3 0.050
-
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.5.1.7. Pemasangan 1m2 langit langit gypsum board t=9mm
A TENAGA
- Pekerja L.01 O/H 0.100
- Tukang kayu L.02 O/H 0.050
- Kepala Tukang kayu L.03 O/H 0.005
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- gypsum board 9mm m2 0.364
- paku skrup kg 0.110
-
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.5.2.32. Pemasangan 1m2 genteng metal 80x100 atap pelana
A TENAGA
- Pekerja L.01 O/H 0.200
- Tukang kayu L.02 O/H 0.100
- Kepala Tukang kayu L.03 O/H 0.010
- Mandor L.04 O/H 0.001
JUMLAH TENAGA KERJA
B BAHAN
- genteng metal buah 1.30
- paku biasa 1/2 - 1'' kg 0.20
-
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.5.2.37. Pemasangan 1 m1 nok genteng metal 80x100 atap pelana
A TENAGA
- Pekerja L.01 O/H 0.250
- Tukang kayu L.02 O/H 0.150
- Kepala Tukang kayu L.03 O/H 0.015
- Mandor L.04 O/H 0.013
JUMLAH TENAGA KERJA
B BAHAN
- nok genteng metal buah 1.10
- paku biasa 1/2 - 1'' kg 0.50
-
-
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.150
- Tukang kayu L.02 O/H 0.050
- Kepala Tukang kayu L.03 O/H 0.005
- Mandor L.04 O/H 0.008
JUMLAH TENAGA KERJA
B BAHAN
- almunum foil m2 1.05
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.7.1.10. Pengecatan 1 m2 tembok terbaru 1 lapis plamir, 1 lapis cat dasar, 1 lapis cat pe
A TENAGA
- Pekerja L.01 O/H 0.200
- Tukang kayu L.02 O/H 0.063
- Kepala Tukang kayu L.03 O/H 0.0063
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KERJA
B BAHAN
- plamur kg 0.10
- cat dasar kg 0.10
- cat penutup kg 0.260
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.010
- Tukang batu L.02 O/H 0.010
- Kepala Tukang batu L.03 O/H 0.010
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- floor drain unit 1.00
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.5.1.1.19. Pemasangan 1 buah kran 1/2 '' atau 3/4
A TENAGA
- Pekerja L.01 O/H 0.010
- Tukang batu L.02 O/H 0.400
- Kepala Tukang batu L.03 O/H 0.040
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- kran air m 1.00
- sealtape buah 0.025
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
- tukang pasang pipa L.01 O/H 0.010
- L.02 O/H 0.400
- L.03 O/H 0.040
- L.04 O/H 0.005
JUMLAH TENAGA KERJA
B BAHAN
- pipa pvc 1/2'' m 1.20
- perlengkapan % 35,00
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- tukang pasang pipa L.01 O/H 0.036
-
-
-
JUMLAH TENAGA KERJA
B BAHAN
- pipa pvc 3/4'' m 1.20
- perlengkapan % 35,00
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- tukang pasang pipa L.01 O/H 0.081
-
-
-
JUMLAH TENAGA KERJA
B BAHAN
- pipa pvc 3'' m 1.20
- perlengkapan % 35,00
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- tukang pasang pipa L.01 O/H 0.081
-
-
-
JUMLAH TENAGA KERJA
B BAHAN
- pipa pvc 3'' m 1.20
- perlengkapan % 35,00
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 3.30
- Tukang batu L.02 O/H 1.10
- Kepala Tukang batu L.03 O/H 0.01
- Mandor L.04 O/H 0.16
JUMLAH TENAGA KERJA
B BAHAN
- closet duduk unit 1.00
- perlengkapan ls 6%xcloset
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
upah % 100.00
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
Jenis Pekerjaan : A.4.2.1.21. Pemasangan 1 m2 rangka bes1 hollow 4x4x2 modul 60x60 untuk plafond
A TENAGA
Jenis Pekerjaan : A.4.2.1.22. Pemasangan 1 m2 rangka atap pelana baja canai dingin profil C 75
A TENAGA
- Pekerja L.01 O/H 0.734
- Tukang besi L.02 O/H 0.734
- Kepala Tukang besi L.03 O/H 0.073
- Mandor L.04 O/H 0.037
JUMLAH TENAGA KERJA
B BAHAN
- Baja ringan canai dingin c75 kg 3.065
-
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
upah % 100.00
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750
A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- tukang listrik OH 0.0750
- pekerja OH 0.0750
- mandor OH 0.0750
JUMLAH TENAGA KERJA
B BAHAN
- saklar ganda buah 1.000
- inbowdooseng 1.000
-
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- tukang batu OH 2.00
- kepala tukang batu OH 0.20
- pekerja OH 1.00
- mandor OH 0.10
JUMLAH TENAGA KERJA
B BAHAN
- galian lebih dari 3m m3 5.8483
- urugan tanah m3 4.6935
- buis beton 800 buah 14.000
- batu koral m3 0.3462
- beton tebal 50mm m3 0.0080
- plat beton penutup t=100 mm m3 0.1005
- ijuk bdl 20.0000
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- tukang listrik OH 0.1000
- pekerja OH 0.1500
- mandor OH 0.0500
-
JUMLAH TENAGA KERJA
B BAHAN
- kabel NYM 3X2.5 mm 1.0000
-
-
-
-
-
-
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.015
- Tukang kayu L.02 O/H 0.150
- Kepala Tukang kayu L.03 O/H 0.015
- Mandor L.04 O/H 0.0008
JUMLAH TENAGA KERJA
B BAHAN
- kaca tebal 5mm m 1.10
- sealent kg 0.050
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.780
- Tukang batu L.02 O/H 0.390
- Kepala Tukang batu L.03 O/H 0.039
- Mandor L.04 O/H 0.039
JUMLAH TENAGA KERJA
B BAHAN
- batu belah m3 1.20
- pasir urug m3 0.432
-
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.120
- Tukang Kayu L.02 O/H 0.060
- Kepala Tukang L.03 O/H 0.006
- Mandor L.04 O/H 0.006
JUMLAH TENAGA KERJA
B BAHAN
- Atap Polycarbonate m2 1.000
- Paku skrup kg 0.346
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- bongkar bekisting plat lantai OH 0.5000
- pek.pengecoran plat OH 0.1250
- pek.penulangan OH 6.0420
- pek.pemasangan bondeck 1.00
JUMLAH TENAGA KERJA
B BAHAN
- beton k-225 m3 0.125
- kayu borneo super m3 0.003
- bondeck t= 0.75 1000 mm m2 1.00
- endstop m3 0.500
- wiremesh m6 lbr 0.008
- besi beton kg 2.23
- bahan paku dan mur kg 0.100
paku1 -3cm
-
JUMLAH HARGA BAHAN
C PERALATAN
- scafolding m2 1,000
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
Jenis Pekerjaan : A.4.5.1.7. Pemasangan 1m2 plafond gypsum 9 mm jaya board
A TENAGA
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 15%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
KERJAAN
8/PRT/M/2016
Kayu Setinggi 2 m
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 63,057.20
166,729.00 33,345.80
5.00 0.10
194,274.00 3,885.48
MLAH TENAGA KERJA 100,288.58
26,400.00 33,000.00
1,120.00 5,600.00
220,000.00 1,100.00
220,000.00 1,980.00
4,125,000.00 297,000.00
31,900.00 1,914.00
1,250.00 500.00
MLAH HARGA BAHAN 341,094.00
441,382.58
44,138.26
485,520.84
ri Seng Setinggi 2 m
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 63,057.20
166,729.00 33,345.80
5.00 0.10
194,274.00 3,885.48
MLAH TENAGA KERJA 100,288.58
26,400.00 33,000.00
1,120.00 2,800.00
27,500.00 33,000.00
220,000.00 1,100.00
220,000.00 1,980.00
4,125,000.00 297,000.00
31,900.00 1,914.00
24,200.00 10,890.00
MLAH HARGA BAHAN 381,684.00
481,972.58
48,197.26
530,169.84
157,643.00 15,764.30
166,729.00 16,672.90
182,676.00 1,826.76
194,274.00 971.37
MLAH TENAGA KERJA 35,235.33
1,650,000.00 19,800.00
27,000.00 540.00
1,093,750.00 7,656.25
MLAH HARGA BAHAN 27,996.25
63,231.58
6,323.16
69,554.74
ruksi kayu )
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 157,643.00
166,729.00 250,093.50
5.00 0.75
194,274.00 9,713.70
MLAH TENAGA KERJA 417,450.95
26,400.00 79,200.00
4,125,000.00 1,138,500.00
19,250.00 13,475.00
69,250.00 103,875.00
MLAH HARGA BAHAN 1,335,050.00
1,752,500.95
175,250.10
1,927,751.05
157,643.00 15,764.30
194,274.00 9,713.70
MLAH TENAGA KERJA 25,478.00
25,478.00
2,547.80
28,025.80
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 2,102,012
194,274.00 129,386
MLAH TENAGA KERJA 2,231,398
2,231,398
223,140
2,454,538
157,643.00 1,051,005.88
194,274.00 64,693.24
MLAH TENAGA KERJA 1,115,699.12
1,115,699.12
111,569.91
1,227,269.04
157,643.00 118,232.25
194,274.00 4,856.85
MLAH TENAGA KERJA 123,089.10
123,089.10
12,308.91
135,398.01 2 270,796.02
166,729.00 150,056.10
194,274.00 8,742.33
MLAH TENAGA KERJA 158,798.43
158,798.43
15,879.84
174,678.27
157,643.00 157,643.00
194,274.00 6,216.77
MLAH TENAGA KERJA 163,859.77
163,859.77
16,385.98
180,245.74
157,643.00 236,464.50
194,274.00 11,656.44
MLAH TENAGA KERJA 248,120.94
248,120.94
24,812.09
272,933.03
157,643.00 189,171.60
194,274.00 8,742.33
MLAH TENAGA KERJA 197,913.93
MLAH HARGA BAHAN
197,913.93
19,791.39
217,705.32
ejauh 30 m'
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 52,022.19
194,274.00 1,942.74
MLAH TENAGA KERJA 53,964.93
53,964.93
5,396.49
59,361.42
166,729.00 83,364.50
194,274.00 9,713.70
MLAH TENAGA KERJA 93,078.20
157,643.00 78,821.50
194,274.00 9,713.70
MLAH TENAGA KERJA 88,535.20
88,535.20
8,853.52
97,388.72
157,643.00 47,292.90
194,274.00 1,942.74
MLAH TENAGA KERJA 49,235.64
100,000.00 120,000.00
MLAH HARGA BAHAN 120,000.00
169,235.64
16,923.56
186,159.20
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 39,410.75
194,274.00 4,856.85
MLAH TENAGA KERJA 44,267.60
148,000.00 177,600.00
MLAH HARGA BAHAN 177,600.00
221,867.60
22,186.76
244,054.36
mpuran 1SP : 4 PP
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 236,464.50
0.00 0.00
5.00 0.38
194,274.00 14,570.55
MLAH TENAGA KERJA 251,035.43
100,000.00 120,000.00
1,120.00 182,560.00
185,000.00 96,200.00
MLAH HARGA BAHAN 398,760.00
649,795.43
64,979.54
714,774.97
157,643.00 535,986.20
0.00 0.00
5.00 0.43
194,274.00 33,026.58
MLAH TENAGA KERJA 569,013.21
100,000.00 48,000.00
1,120.00 217,280.00
185,000.00 57,720.00
194,250.00 90,909.00
13,000.00 1,638,000.00
16,000.00 28,800.00
MLAH HARGA BAHAN 2,080,709.00
2,649,722.21
264,972.22
2,914,694.43
157,643.00 260,110.95
0.00 0.00
5.00 0.14
194,274.00 16,124.74
MLAH TENAGA KERJA 276,235.83
1,120.00 276,640.00
235,000.00 121,556.55
162,750.00 120,435.00
125.00 26,875.00
MLAH HARGA BAHAN 545,506.55
821,742.38
82,174.24
903,916.62
157,643.00 260,110.95
0.00 0.00
5.00 0.14
194,274.00 16,124.74
MLAH TENAGA KERJA 276,235.83
1,120.00 309,120.00
235,000.00 115,821.43
194,250.00 145,615.56
125.00 26,875.00
MLAH HARGA BAHAN 597,431.98
873,667.82
131,050.17
1,004,717.99
1,500.00 370,500.00
312,000.00 161,385.71
237,000.00 175,380.00
0.00
MLAH HARGA BAHAN 707,265.71
945,093.07
94,509.31
1,039,602.38
157,643.00 260,110.95
166,729.00 45,850.48
182,676.00 5,114.93
194,274.00 16,124.74
MLAH TENAGA KERJA 327,201.10
1,116,369.83
111,636.98
1,228,006.81
remesh ) M6
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 3,941.08
166,729.00 4,168.23
182,676.00 4,566.90
194,274.00 194.27
MLAH TENAGA KERJA 12,870.47
27,514.00 280,642.80
21,000.00 1,050.00
MLAH HARGA BAHAN 281,692.80
294,563.27
29,456.33
324,019.60
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 81,974.36
166,729.00 43,349.54
182,676.00 4,749.58
194,274.00 5,051.12
MLAH TENAGA KERJA 135,124.60
15,500.00 620.00
19,250.00 5,775.00 1
15,600.00 1,560.00
MLAH HARGA BAHAN 7,955.00
143,079.60
14,307.96
157,387.56
157,643.00 81,974.36
166,729.00 43,349.54
194,274.00 5,051.12
194,274.00 5,051.12
MLAH TENAGA KERJA 135,426.15
2,340,000.00 105,300.00
19,250.00 5,775.00
15,600.00 1,560.00
MLAH HARGA BAHAN 112,635.00
248,061.15
24,806.11
272,867.26
157,643.00 104,044.38
166,729.00 55,020.57
182,676.00 6,028.31
194,274.00 6,411.04
MLAH TENAGA KERJA 171,504.30
0.00
0.00
0.00
0.00
0.00
0.00
MLAH HARGA BAHAN 0.00
171,504.30
17,150.43
188,654.73
157,643.00 104,044.38
166,729.00 55,020.57
0.00 0.00
194,274.00 6,411.04
MLAH TENAGA KERJA 165,475.99
2,340,000.00 93,600.00
19,250.00 7,700.00
15,600.00 3,120.00
1,650,000.00 29,700.00
120,000.00 42,000.00
26,400.00 52,800.00
352,000.00 228,920.00
394,395.99
39,439.60
433,835.59 340,235.59
157,643.00 104,044.38
166,729.00 55,020.57
182,676.00 6,028.31
194,274.00 6,411.04
MLAH TENAGA KERJA 171,504.30
2,340,000.00 93,600.00
19,250.00 7,700.00
15,600.00 3,120.00
2,340,000.00 42,120.00
120,000.00 42,000.00
26,400.00 158,400.00
MLAH HARGA BAHAN 346,940.00
518,444.30
51,844.43
570,288.73
2,340,000.00 93,600.00
19,250.00 7,700.00
15,600.00 3,120.00
2,340,000.00 46,800.00
120,000.00 42,000.00
26,400.00 79,200.00
65,000.00 260,000.00
MLAH HARGA BAHAN 532,420.00
703,924.30
70,392.43
774,316.73
157,643.00 28,375.74
166,729.00 3,334.58
166,729.00 3,334.58
166,729.00 3,334.58
182,676.00 1,096.06
194,274.00 1,748.47
MLAH TENAGA KERJA 41,224.00
1,000,000.00 2,000.00
19,250.00 192.50
15,600.00 18,720.00
9,500.00 28,500.00
16,000.00 7,200.00
1,120.00 4,480.00
235,000.00 1,410.00
220,000.00 1,980.00
MLAH HARGA BAHAN 64,482.50
105,706.50
10,570.65
116,277.15
(10 x 15) cm
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 46,819.97
166,729.00 5,502.06
166,729.00 5,502.06
166,729.00 5,502.06
182,676.00 1,826.76
194,274.00 2,914.11
MLAH TENAGA KERJA 68,067.01
1,000,000.00 3,000.00
19,250.00 385.00
15,600.00 18,720.00
9,500.00 34,200.00
16,000.00 800.00
1,120.00 6,160.00
235,000.00 2,115.00
220,000.00 3,300.00
MLAH HARGA BAHAN 68,680.00
136,747.01
20,512.05
157,259.06
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 9,458.58
166,729.00 10,003.74
182,676.00 1,096.06
194,274.00 582.82
MLAH TENAGA KERJA 21,141.20
16,450.00 18,917.50
MLAH HARGA BAHAN 18,917.50
40,058.70
6,008.80
46,067.50
157,643.00 9,458.58
0.00 0.00
5.00 0.03
194,274.00 582.82
MLAH TENAGA KERJA 10,041.43
22,500.00 25,875.00
MLAH HARGA BAHAN 25,875.00
35,916.43
5,387.46
41,303.90
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 630.57
0.00 0.00
5.00 0.00
194,274.00 38.85
MLAH TENAGA KERJA 669.43
220,000.00 8,800.00
0.00 0.00
17,600.00 70.40
MLAH HARGA BAHAN 8,870.40
9,539.83
1,430.97
10,970.80
157,643.00 94,585.80
0.00 0.00
5.00 0.10
194,274.00 5,828.22
MLAH TENAGA KERJA 100,414.12
890.00 124,600.00
1,120.00 48,720.00
185,000.00 14,800.00
MLAH HARGA BAHAN 188,120.00
157,643.00 94,585.80
0.00 0.00
5.00 0.10
194,274.00 5,828.22
MLAH TENAGA KERJA 100,414.12
890.00 124,600.00
1,120.00 29,736.00
185,000.00 17,205.00
MLAH HARGA BAHAN 171,541.00
271,955.12
40,793.27
312,748.39
157,643.00 47,292.90
0.00 0.00
5.00 0.05
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.06
890.00 62,300.00
1,120.00 21,224.00
185,000.00 7,030.00
MLAH HARGA BAHAN 90,554.00
MLAH HARGA ALAT
140,761.06
21,114.16
161,875.22
157,643.00 47,292.90
0.00 0.00
5.00 0.05
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.06
1,100.00 77,000.00
1,500.00 21,555.00
185,000.00 7,400.00
MLAH HARGA BAHAN 105,955.00
156,162.06
23,424.31
179,586.37
157,643.00 47,292.90
0.00 0.00
5.00 0.05
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.06
890.00 62,300.00
1,120.00 12,880.00
185,000.00 7,955.00
MLAH HARGA BAHAN 83,135.00
133,342.06
20,001.31
153,343.37
157,643.00 47,292.90
0.00 0.00
5.00 0.08
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.09
1,120.00 11,450.88
185,000.00 3,700.00
MLAH HARGA BAHAN 15,150.88
65,357.97
6,535.80
71,893.76
157,643.00 47,292.90
0.00 0.00
5.00 0.08
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.09
1,120.00 6,988.80
185,000.00 4,440.00
MLAH HARGA BAHAN 11,428.80
61,635.89
6,163.59
67,799.47
157,643.00 47,292.90
0.00 0.00
5.00 0.08
194,274.00 2,914.11
MLAH TENAGA KERJA 50,207.09
1,120.00 7,100.80
185,000.00 2,220.00
MLAH HARGA BAHAN 9,320.80
59,527.89
5,952.79
65,480.67
1,120.00 3,640.00
MLAH HARGA BAHAN 3,640.00
37,111.39
3,711.14
40,822.53
157,643.00 40,987.18
0.00 0.00
5.00 0.10
194,274.00 2,525.56
MLAH TENAGA KERJA 43,512.84
1,120.00 9,296.00
185,000.00 3,330.00
MLAH HARGA BAHAN 12,626.00
56,138.84
5,613.88
61,752.73
0.00 0.00
1,120.00 13,160.00
185,000.00 6,475.00
MLAH HARGA BAHAN 19,635.00
136,784.87
20,517.73
157,302.59
157,643.00 18,917.16
0.00 0.00
5.00 0.03
194,274.00 1,165.64
MLAH TENAGA KERJA 20,082.83
0.00 0.00
10,000.00 3,460.00
MLAH HARGA BAHAN 3,460.00
23,542.83
3,531.43
27,074.26
n menie besi dengan perancah
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 39,410.75
0.00 0.00
5.00 0.11
194,274.00 1,457.06
MLAH TENAGA KERJA 40,867.92
24,200.00 2,420.00
11,600.00 116.00
12,500.00 125.00
3,750,000.00 7,500.00
MLAH HARGA BAHAN 10,161.00
51,028.92
7,654.34
58,683.26
157,643.00 39,410.75
0.00 0.00
5.00 0.13
194,274.00 242.84
MLAH TENAGA KERJA 39,653.72
95,200.00 9,520.00
95,200.00 9,520.00
95,200.00 7,616.00
12,500.00 125.00
10,000.00 100.00
MLAH HARGA BAHAN 26,881.00
MLAH HARGA ALAT
66,534.72
9,980.21
76,514.93
157,643.00 9,458.58
Err:509 Err:509
Err:509 Err:509
194,274.00 582.82
MLAH TENAGA KERJA Err:509
95,200.00 28,560.00
12,500.00 125.00
10,000.00 100.00
MLAH HARGA BAHAN 28,785.00
Err:509
Err:509
Err:509
157,643.00 16,552.52
Err:509 Err:509
194,274.00 2,137.01
MLAH TENAGA KERJA Err:509
786,500.00 786,500.00
MLAH HARGA BAHAN 786,500.00
375,000.00 3,750.00
Err:509
Err:509
Err:509
157,643.00 18,601.87
Err:509 Err:509
194,274.00 2,331.29
MLAH TENAGA KERJA Err:509
0.00 0.00
MLAH HARGA BAHAN 0.00
375,000.00 4,500.00
Err:509
Err:509
Err:509
157,643.00 29,794.53
Err:509 Err:509
194,274.00 3,691.21
MLAH TENAGA KERJA Err:509
48,400.00 48,400.00
MLAH HARGA BAHAN 48,400.00
375,000.00 9,000.00
Err:509
Err:509
Err:509
157,643.00 40,356.61
Err:509 Err:509
194,274.00 5,051.12
MLAH TENAGA KERJA Err:509
98,120.00 98,120.00
MLAH HARGA BAHAN 98,120.00
375,000.00 12,750.00
Err:509
Err:509
Err:509
157,643.00 46,347.04
Err:509 Err:509
194,274.00 5,633.95
MLAH TENAGA KERJA Err:509
146,520.00 146,520.00
MLAH HARGA BAHAN 146,520.00
375,000.00 15,000.00
Err:509
Err:509
Err:509
157,643.00 63,057.20
Err:509 Err:509
194,274.00 7,770.96
MLAH TENAGA KERJA Err:509
0.00 0.00
MLAH HARGA BAHAN 0.00
Err:509
Err:509
Err:509
157,643.00 79,767.36
Err:509 Err:509
194,274.00 9,830.26
MLAH TENAGA KERJA Err:509
5,660.00 0.00
MLAH HARGA BAHAN 0.00
MLAH HARGA ALAT 0.00
Err:509
Err:509
Err:509
157,643.00 125,483.83
Err:509 Err:509
194,274.00 15,464.21
MLAH TENAGA KERJA Err:509
68,090.00 68,090.00
MLAH HARGA BAHAN 68,090.00
Err:509
Err:509
Err:509
157,643.00 149,603.21
Err:509 Err:509
194,274.00 18,436.60
MLAH TENAGA KERJA Err:509
99,970.00 99,970.00
MLAH HARGA BAHAN 99,970.00
Err:509
Err:509
Err:509
157,643.00 151,021.99
Err:509 Err:509
194,274.00 18,611.45
MLAH TENAGA KERJA Err:509
210,500.00 210,500.00
MLAH HARGA BAHAN 210,500.00
Err:509
Err:509
Err:509
157,643.00 91,275.30
Err:509 Err:509
194,274.00 11,248.46
MLAH TENAGA KERJA Err:509
1,867,800.00 1,867,800.00
MLAH HARGA BAHAN 1,867,800.00
375,000.00 1,500.00
Err:509
Err:509
Err:509
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 111,611.24
0.00 0.00
194,274.00 13,754.60
MLAH TENAGA KERJA 125,365.84
0.00
MLAH HARGA BAHAN 0.00
375,000.00 1,500.00
126,865.84
12,686.58
139,552.43
157,643.00 175,456.66
0.00 0.00
194,274.00 21,622.70
MLAH TENAGA KERJA 197,079.36
4,998,800.00 4,998,800.00
MLAH HARGA BAHAN 4,998,800.00
375,000.00 1,500.00
5,197,379.36
519,737.94
5,717,117.29
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 225,271.85
0.00 0.00
194,274.00 27,761.75
MLAH TENAGA KERJA 253,033.60
56,160,000.00 56,160,000.00
MLAH HARGA BAHAN 56,160,000.00
375,000.00 37,500.00
56,450,533.60
5,645,053.36
62,095,586.96
157,643.00 270,200.10
0.00 0.00
194,274.00 33,298.56
MLAH TENAGA KERJA 303,498.67
78,000,000.00 78,000,000.00
MLAH HARGA BAHAN 78,000,000.00
375,000.00 112,500.00
78,415,998.67
7,841,599.87
86,257,598.53
157,643.00 16,710.16
0.00 0.00
194,274.00 2,137.01
MLAH TENAGA KERJA 18,847.17
435,000.00 435,000.00
MLAH HARGA BAHAN 435,000.00
375,000.00 10,500.00
447,637.01
44,763.70
492,400.72
157,643.00 34,050.89
0.00 0.00
194,274.00 4,274.03
MLAH TENAGA KERJA 38,324.92
6,000.00 6,000.00
MLAH HARGA BAHAN 6,000.00
375,000.00 10,875.00
21,149.03
2,114.90
23,263.93
157,643.00 1,261.14
194,274.00 155.42
MLAH TENAGA KERJA 1,416.56
125,000.00 2,207.81
7,400.00 444.00
19,500.00 39.00
MLAH HARGA BAHAN 2,690.81
4,107.38
410.74
4,518.11
157,643.00 1,261.14
194,274.00 155.42
MLAH TENAGA KERJA 1,416.56
125,000.00 3,925.00
7,400.00 444.00
19,500.00 39.00
MLAH HARGA BAHAN 4,408.00
5,824.56
582.46
6,407.02
0.00
0.00
0.00
0.00
MLAH TENAGA KERJA 0.00
3,638,800.00 3,638,800.00
MLAH HARGA BAHAN 3,638,800.00
0.00
MLAH HARGA ALAT 0.00
3,638,800.00
363,880.00
4,002,680.00
157,643.00 1,261.14
194,274.00 155.42
MLAH TENAGA KERJA 1,416.56
100,000.00 7,800.00
ran tertutup
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MLAH HARGA ALAT 0.00
0.00
0.00
0.00
157,643.00 260,110.95
182,676.00 50,235.90
182,676.00 5,114.93
194,274.00 320,552.10
MLAH TENAGA KERJA 636,013.88
56,000.00
235,000.00
237,000.00
A TENAGA
157,643.00 1,103.50 - Pekerja
166,729.00 1,167.10 - Tukang Besi
182,767.00 127.94 - Kepala Tukang
194,274.00 77.71 - Mandor
MLAH TENAGA KERJA 2,476.25
B BAHAN
7,120.00 7,476.00 - Besi Beton(Pol
21,000.00 315.00 - kawat Ikat
10,267.25 D Jumlah (A + B + C)
1,026.73 E Over head & Profit (maksimum 15 % x D)
11,293.98 F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
g Jalan Setapak
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
g Jalan Setapak
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 9,458.58
166,729.00 10,003.74
182,676.00 1,096.06
194,274.00 582.82
MLAH TENAGA KERJA 21,141.20
183,333.00 183,333.00
183,915.82
18,391.58
202,307.40
0.00
0.00
0.00
0.00
MLAH TENAGA KERJA
0.00
0.00
0.00
0.00
157,643.00 6,305.72
166,729.00 3,334.58
182,676.00 365.35
194,274.00 388.55
MLAH TENAGA KERJA
35,000.00 14,000.00
9,300.00 2,790.00
60,000.00 2,400.00
MLAH HARGA BAHAN 19,190.00
19,578.55
1,957.85
21,536.40
157,643.00 6,305.72
194,274.00 388.55
MLAH TENAGA KERJA
100,000.00 40,000.00
MLAH HARGA BAHAN 40,000.00
40,388.55
4,038.85
44,427.40
a (K-350) Kedap Air, Slump (12 ± 2) cm, w/c = 0.48 Kedap Air
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 331,050.30
166,729.00 58,355.15
182,676.00 6,393.66
194,274.00 40,797.54
MLAH TENAGA KERJA 436,596.65
1,500.00 672,000.00
312,000.00 208,104.00
237,000.00 237,000.00
0.00
MLAH HARGA BAHAN 1,117,104.00
1,553,700.65
155,370.07
1,709,070.72
Beton Saluran
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 104,044.38
166,729.00 55,020.57
182,676.00 6,028.31
194,274.00 6,411.04
MLAH TENAGA KERJA 171,504.30
205,000.00 26,240.00
1,650,000.00 11,550.00
17,000.00 5,100.00
69,400.00 13,880.00
MLAH HARGA BAHAN 56,770.00
228,274.30
22,827.43
251,101.73
remesh ) M12
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 3,941.08
166,729.00 4,168.23
182,676.00 4,566.90
194,274.00 194.27
MLAH TENAGA KERJA 12,870.47
113,315.00 1,155,813.00
21,000.00 1,050.00
MLAH HARGA BAHAN 1,156,863.00
1,169,733.47
116,973.35
1,286,706.82
157,643.00 6,778.65
0.00 0.00
182,676.00 7,855.07
194,274.00 4,079.75
MLAH TENAGA KERJA 18,713.47
0.00
0.00
0.00
0.00
157,643.00 6,778.65 2
0.00 0.00
182,676.00 7,855.07
194,274.00 4,079.75
MLAH TENAGA KERJA 18,713.47
0.00
0.00
0.00
MLAH HARGA BAHAN 0.00
0.00
0.00
40cmx40cm
Harga Satuan Jumlah Harga
261,323.50
26,132.35
287,455.85
157,643.00 110,350.10
166,729.00 58,355.15
182,676.00 6,393.66
194,274.00 6,799.59
MLAH TENAGA KERJA 181,898.50
52,000.00 54,600.00
1,500.00 15,600.00
7,000.00 7,000.00
185,000.00 8,325.00
MLAH HARGA BAHAN 70,200.00
157,643.00 141,878.70
166,729.00 75,028.05
182,676.00 8,220.42
194,274.00 8,742.33
MLAH TENAGA KERJA 233,869.50
2,750.00 55,000.00
1,500.00 13,950.00 52,000.00 2,600.000
7,000.00 0.00
185,000.00 0.00
MLAH HARGA BAHAN 68,950.00 55,000.00 2,750.000
317,819.50
31,781.95
349,601.45
157,643.00 14,187.87
166,729.00 15,005.61
182,676.00 6,393.66
194,274.00 971.37
MLAH TENAGA KERJA 36,558.51
4,000.00 10,000.00
15,000.00 17,100.00
10,000.00 250.00
185,000.00 555.00
MLAH HARGA BAHAN 27,100.00
63,658.51
6,365.85
70,024.36
= 6cm carport
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 39,410.75
166,729.00 83,364.50
182,676.00 9,133.80
194,274.00 252.56
MLAH TENAGA KERJA 132,161.61
110,000.00 111,100.00
185,000.00 9,250.00
267,511.61
26,751.16
294,262.77
ard t=9mm
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 15,764.30
166,729.00 8,336.45
182,676.00 913.38
194,274.00 971.37
MLAH TENAGA KERJA 25,985.50
0.00
0.00
0.00
0.00
atap pelana
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 31,528.60
166,729.00 16,672.90
182,676.00 1,826.76
194,274.00 194.27
MLAH TENAGA KERJA 50,222.53
0.00
0.00
0.00
0.00
157,643.00 39,410.75
166,729.00 25,009.35
182,676.00 2,740.14
194,274.00 2,525.56
MLAH TENAGA KERJA 69,685.80
0.00
0.00
0.00
0.00
157,643.00 23,646.45
166,729.00 8,336.45
182,676.00 913.38
194,274.00 1,554.19
MLAH TENAGA KERJA 34,450.47
0.00
0.00
0.00
157,643.00 31,528.60
166,729.00 10,503.93
182,676.00 1,150.86
194,274.00 582.82
MLAH TENAGA KERJA 43,766.21 25 319,000.00 12,760.00
15,000.00 1,500.00
12,760.00 1,276.00
12,760.00 3,317.60
61,542.21
6,154.22
67,696.43
Jenis Pekerjaan
No.
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
A
157,643.00 1,576.43
166,729.00 1,667.29
182,676.00 1,826.76
194,274.00 971.37
MLAH TENAGA KERJA 6,041.85 B
65,000.00 65,000.00
Jenis Pekerjaan
0 tinggi 65 cm
No.
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
A
157,643.00 504,457.60
166,729.00 191,738.35
182,676.00 2,009.44
194,274.00 3,108.38
MLAH TENAGA KERJA 701,313.77 B
D
MLAH HARGA ALAT E
F
PERMEN PUPR NO.28/PRT/M/
0.00
0.00
157,643.00 1,576.43
166,729.00 66,691.60
182,676.00 7,307.04
194,274.00 971.37
MLAH TENAGA KERJA 76,546.44
21,450.00 21,450.00
8,000.00 200.00
meter 1/2''
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,645.00 1,576.45
0.00
0.00
0.00
MLAH TENAGA KERJA 1,576.45
4 1,312.50
5,250.00 6,300.00
1,837.00 1,837.00 35% 1,837.50
24,713.45
3,707.02
28,420.47
meter 3/4''
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,645.00 5,675.22
33,075.22
4,961.28
38,036.50
157,645.00 12,769.25
69,619.25
10,442.89
80,062.13
157,645.00 12,769.25
97,519.25
14,627.89
112,147.13
Jenis Pekerjaan :
A TENAGA
157,643.00 520,221.90 -
166,729.00 183,401.90 -
182,676.00 1,826.76 -
194,274.00 31,083.84 -
MLAH TENAGA KERJA 736,534.40
B BAHAN
1,499,000.000 1,499,000.00 -
89,940.00 6% -
-
MLAH HARGA BAHAN 1,588,940.00
C PERALATAN
2,350,474.40 D Jumlah (A + B + C)
352,571.16 E Over head & Profit (maksimum 15 % x D)
2,703,045.56 F Harga Satuan Pekerjaan (D + E)
0.00
0.00
166,729.00 58,355.15
182,676.00 6,393.66
194,274.00 3,496.93
MLAH TENAGA KERJA 68,245.74
24,000.00
24,000.00
119,845.74
17,976.86
137,822.60
75.00
157,643.00 115,709.96
166,729.00 122,379.09
182,676.00 13,335.35
194,274.00 7,188.14
MLAH TENAGA KERJA 258,612.53
125,000.00 383,125.00
680,050.03
102,007.51
782,057.54
24,000.00 72,000.00
11,500.00 172,500.00
1,500.00 1,500.00
6,000.00 12,000.00
1,000.00 24,000.00
MLAH HARGA BAHAN 244,500.00
0.00
0.00
182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55
11,800.00 11,800.00
11,500.00 138,000.00
5,250.00 63,000.00
256,094.48
38,414.17
294,508.65
175,000.00 175,000.00
10% 17,500
232,594.48
34,889.17
267,483.65
182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55
46,000.00
101,094.48
15,164.17
116,258.65
182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55
32,500.00
87,594.48
13,139.17
100,733.65
182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55
148,500.00
203,594.48
30,539.17
234,133.65
182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55
175,000.00
182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55
20,580.00 20,580.00
75,674.48
11,351.17
87,025.65
182,676.00 13,700.70
157,643.00 11,823.23
194,274.00 14,570.55
MLAH TENAGA KERJA 40,094.48
20,610.00
75,704.48
11,355.67
87,060.15
182,676.00 18,267.60
157,643.00 23,646.45
194,274.00 9,713.70
11,500.00 11,500.00
78,127.75
11,719.16
89,846.91
157,643.00 2,364.65
166,729.00 25,009.35
182,676.00 2,740.14
194,274.00 155.42
MLAH TENAGA KERJA 30,269.55
105,000.00 115,500.00
50,000.00
160,769.55
24,115.43
184,884.99
157,643.00 122,961.54
166,729.00 65,024.31
182,676.00 7,124.36
194,274.00 7,576.69
MLAH TENAGA KERJA 202,686.90
130,000.00 156,000.00
150,000.00 64,800.00
438,486.90
65,773.04
504,259.94
157,643.00 18,917.16
0.00 0.00
157,643.00 945.86
194,274.00 1,165.64
MLAH TENAGA KERJA 21,028.66
0.00 0.00
0.00 0.00
MLAH HARGA BAHAN 0.00
21,028.66
3,154.30
24,182.96
7,000.00 3,500.00
50.000 6.25
3,000.00 18,126.00
25,000.00 25,000.00
MLAH TENAGA KERJA 46,632.25
1,228,006.81 153,500.85
2,800,000.00 8,400.00
105,000.00 105,000.00
50,000.00 25,000.00
325,000.00 2,600.00 harga perlembar 576,000.00
9,500.00 21,204.00
10,500.00 1,050.00 5
25,000.00
MLAH HARGA ALAT 25,000.00
388,387.10
388,387.10 2 14 28
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
166,729.00 33,345.80
182,676.00 3,653.52
194,274.00 5,828.22
MLAH TENAGA KERJA 42,827.54
63,499.00 23,113.64
10,000.00 1,100.00
0.00
MLAH HARGA BAHAN 24,213.64
67,041.18
10,056.18
77,097.35
Kg Pembesian besi 8
Harga
Jumlah Harga
Kode Satuan Koefisien Satuan
(Rp.) (Rp.)
6,553.40
10% 655.34
7,208.74
BIDANG CIPTA KARYA
7,208.74
:
Uraian
Kg 247.000 1,500.00 370,500.00
m3 0.517 312,000.00 161,385.71
m3 0.740 237,000.00 175,380.00 TENAGA
Liter 215.000 0.00 -
-
-
-
BAHAN
-
-
-
-
PERALATAN
Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D)
Harga Satuan Pekerjaan (D + E)
nis Pekerjaan : A.4.7.1.10. Pengecatan 1 m2 tembok terbaru 1 lapis plamir, 1 lapis cat dasar, 1 lapis c
TENAGA
- Pekerja L.01 O/H 0.200
- Tukang kayu L.02 O/H 0.063
- Kepala Tukang L.03 O/H 0.0063
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KERJA
BAHAN
- plamur kg 0.10
- cat dasar kg 0.10
- cat penutup kg 0.260
-
JUMLAH HARGA BAHAN
PERALATAN
Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D) 10%
Harga Satuan Pekerjaan (D + E)
RMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
TENAGA
- Pekerja L.01 O/H 0.010
- Tukang batu L.02 O/H 0.010
- Kepala Tukang L.03 O/H 0.010
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KERJA
BAHAN
- roof drain unit 1.00
-
-
-
JUMLAH HARGA BAHAN
PERALATAN
Jumlah (A + B + C)
Over head & Profit (maksimum 15 % x D) 10%
Harga Satuan Pekerjaan (D + E)
RMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A.5.1.1.. Pemasangan 1 buah shower
915,234.40
t (maksimum 15 % x D) 15% 137,285.16
kerjaan (D + E) 1,052,519.56
115,200.00
10,874,838.83
Jenis Pekerjaan : 1 Kg Pembesian besi ULIR D 16
A TENAGA
- Pekerja L.01
- Tukang Besi L.02
- Kepala Tukang Besi L.03
- Mandor L.04
B BAHAN
- Besi Beton(Polos/Ulir) M.55.d
- kawat Ikat M.67
C PERALATAN
-
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D)
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 40cmx40cm
Harga Satuan
Uraian Kode Satuan Koefisien
(Rp.)
mum 15 % x D) 10%
plamir, 1 lapis cat dasar, 1 lapis cat penutup interior
(Rp.) (Rp.)
157,643.00 31,528.60
166,729.00 10,503.93
182,676.00 1,150.86
194,274.00 582.82
H TENAGA KERJA 43,766.21
71,671.01
7,167.10
78,838.11
(Rp.) (Rp.)
157,643.00 1,576.43
166,729.00 1,667.29
182,676.00 1,826.76
194,274.00 971.37
H TENAGA KERJA 6,041.85
50,000.00 50,000.00
71,041.85
7,104.19
78,146.04
Jenis Pekerjaan : 1 Kg Pembesian besi
Harga
Jumlah Harga
Satuan Koefisien Satuan No. Uraian
(Rp.) (Rp.)
A TENAGA
O/H 0.0070 157,643.00 1,103.50 - Pekerja
O/H 0.0070 166,729.00 1,167.10 - Tukang Bes
O/H 0.0007 182,767.00 127.94 - Kepala Tuk
O/H 0.0004 194,274.00 77.71 - Mandor
JUMLAH TENAGA KERJA 2,476.25
B BAHAN
kg 1.05 13,408.00 14,078.40 - Besi Beton(
kg 0.0150 21,000.00 315.00 - kawat Ikat
16,869.65 D Jumlah (A + B + C)
10% 1,686.97 E Over head & Profit (maksimum 15 % x D)
F Harga Satuan Pekerjaan (D + E)
18,556.62
Jumlah Harga
(Rp.)
110,350.10
58,355.15
6,393.66
6,799.59
181,898.50
15,000.00
266,598.53
26,659.85
293,258.38
Jenis Pekerjaan : A.4.7.1.10. Pengecatan 1 m2 tembok terbaru no drop
A TENAGA
- Pekerja L.01 O/H 0.200
- Tukang kayu L.02 O/H 0.063
- Kepala Tukang L.03 O/H 0.0063
- Mandor L.04 O/H 0.003
JUMLAH TENAGA KER
B BAHAN
31,680.00 - plamur kg 0.10
- cat dasar kg 0.10
- cat penutup kg 0.260
-
JUMLAH HARGA BAHA
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
A TENAGA
- Pekerja L.01 O/H 0.010
- Tukang batu L.02 O/H 0.010
- Kepala Tukang L.03 O/H 0.010
- Mandor L.04 O/H 0.005
JUMLAH TENAGA KER
B BAHAN
- roof drain unit 1.00
-
-
-
JUMLAH HARGA BAHA
C PERALATAN
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
1 Kg Pembesian besi O 12 Jenis Pekerjaan
Harga
Jumlah Harga
Kode Satuan Koefisien Satuan No. Uraian
(Rp.) (Rp.)
A TENAGA
L.01 O/H 0.0070 157,643.00 1,103.50
L.02 O/H 0.0070 166,729.00 1,167.10
L.03 O/H 0.0007 182,767.00 127.94
L.04 O/H 0.0004 194,274.00 77.71
JUMLAH TENAGA KERJA 2,476.25
B BAHAN
M.55.d kg 1.05 8,283.00 8,697.15
M.67 kg 0.0150 21,000.00 315.00
11,488.40 D Jumlah (A + B + C)
maksimum 15 % x D) 10% 1,148.84 E Over head & Profit (maksimu
12,637.24 F Harga Satuan Pekerjaan (D +
bok terbaru no drop
(Rp.) (Rp.)
157,643.00 31,528.60
166,729.00 10,503.93
182,676.00 1,150.86
194,274.00 582.82
JUMLAH TENAGA KERJA 43,766.21 4 189,200.00 47,300.00
15,000.00 1,500.00
47,300.00 4,730.00
47,300.00 12,298.00
77,294.21
7,729.42
85,023.63
(Rp.) (Rp.)
157,643.00 1,576.43
166,729.00 1,667.29
182,676.00 1,826.76
194,274.00 971.37
JUMLAH TENAGA KERJA 6,041.85
65,000.00 65,000.00
86,041.85
8,604.19
94,646.04
: 1 Kg Pembesian besi O 10 Jenis Pekerjaan
A
- Pekerja L.01 O/H 0.0070 157,643.00 1,103.50
- Tukang Bes L.02 O/H 0.0070 166,729.00 1,167.10
- Kepala Tuk L.03 O/H 0.0007 182,767.00 127.94
- Mandor L.04 O/H 0.0004 194,274.00 77.71
JUMLAH TENAGA KERJA 2,476.25
B
- Besi Beton(M.55.d kg 1.05 5,250.00 5,512.50
- kawat Ikat M.67 kg 0.0150 21,000.00 315.00
Jumlah (A + B + C) 8,303.75 D
Over head & Profit (maksimum 15 % x D) 10% 830.38 E
Harga Satuan Pekerjaan (D + E) F
9,134.13
Jenis Pekerjaan : 1 Kg Pembesian besi D 13
Harga
Jumlah Harga
Uraian Kode Satuan Koefisien Satuan
(Rp.) (Rp.)
TENAGA
- Pekerja L.01 O/H 0.0070 157,643.00 1,103.50
- Tukang Bes L.02 O/H 0.0070 166,729.00 1,167.10
- Kepala Tuk L.03 O/H 0.0007 182,767.00 127.94
- Mandor L.04 O/H 0.0004 194,274.00 77.71
JUMLAH TENAGA KERJA 2,476.25
BAHAN
- Besi Beton(M.55.d kg 1.05 8,770.00 9,208.50
- kawat Ikat M.67 kg 0.0150 21,000.00 315.00
Jumlah (A + B + C) 11,999.75
Over head & Profit (maksimum 15 % x D) 10% 1,199.98
Harga Satuan Pekerjaan (D + E) 13,199.73
Jenis Pekerjaan : 1 Kg Pembesian besi O 19
A TENAGA
- Pekerja L.01 O/H 0.0070
- Tukang Besi L.02 O/H 0.0070
- Kepala Tukang Besi L.03 O/H 0.0007
- Mandor L.04 O/H 0.0004
JUMLAH TENAGA KERJA
B BAHAN
- Besi Beton(Polos/Ulir) M.55.d kg 1.05
- kawat Ikat M.67 kg 0.0150
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
157,643.00 1,103.50
166,729.00 1,167.10
182,767.00 127.94
194,274.00 77.71
JUMLAH TENAGA KERJA 2,476.25
18,800.00 19,740.00
21,000.00 315.00
22,531.25
2,253.13
24,784.38
DAFTAR HARGA SATUAN UPAH DAN BAHAN
No URAIAN SAT
1 2 3
I UPAH
1 Mandor HOK
2 Kepala Tukang HOK
3 Tukang HOK
4 Pekerja HOK
1 2 4
II BAHAN
II.1 AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
Tanah Urug m³
Tanah Merah m³
Pasir Beton Cimalaka m³
Pasir Pasang Cimalaka m³
Pasir Pasang m³
Pasir urug m³
Pasir Batu (sirtu) tersaring m³
Sirtu m³
Abu batu m³
Pasir Aspal m³
Gravel m³
Batu Gosok (Batu Apung) kg
Koral beton / Stoned Crusher/ Batu pecah 1-2 m³
Koral beton / Stoned Crusher/ Batu pecah 2-3 m³
Koral beton / Stoned Crusher/ Batu pecah 3-5 m³
Koral beton / Stoned Crusher/ Batu pecah 5-7 m³
Koral beton / Stoned Crusher/ Batu pecah 7-10 m³
Koral beton / Stoned Crusher/ Batu pecah 10-15 m³
Batu belah untuk pondasi m³
Batu bronjol (untuk Bronjong) m³
Batu koral beton kali m³
Batu tempel hitam m²
Batu pinggir beton 10 x 20 x 35 (Kaanstein) bh
Batu pinggir beton 15 x 35 x 50 ( K-225 ) bh
Batu telor m³
Batako kecil 8 x 10 x 20 bh
Batako besar 8 x 20 x 30 bh
HB 10 x 20 x 40 buah
Batu merah bakar kelas I buah
Batu merah bakar kelas II buah
Batu merah oven (klingker) buah
Roster / krawang 30 x 30 buah
Hollow brick Bh
Bata ringan t = 7,5 cm Bh
Bata ringan t = 10 cm Bh
Paving block segi enam warna, t = 8,00 cm m²
Paving block segi enam natural, t = 8,00 cm m²
Paving block segi enam warna, t = 6,00 cm m²
Paving block segi enam natural, t = 6,00 cm m²
Semen PC 50 kg Kg
Semen putih Kg
Batu Pinggir Beton Kerb Type A M
Batu Pinggir Beton Kerb Type B M
Ready Mix K 125, tanpa pompa ( selang ) m³
Ready Mix K 175, tanpa pompa ( selang ) m³
Ready Mix K 225, tanpa pompa ( selang ) m³
Ready Mix K 250, tanpa pompa ( selang ) m³
Ready Mix K 275, tanpa pompa ( selang ) m³
Ready Mix K 300, tanpa pompa ( selang ) m³
Ready Mix K 350, tanpa pompa ( selang ) m³
Ready Mix K 400, tanpa pompa ( selang ) m³
Ready Mix K 450, tanpa pompa ( selang ) m³
Ready Mix K 500, tanpa pompa ( selang ) m³
Beton Siklop m³
Kapur Pasang/Kapur Tembok kg
Sewa Pompa Ready Mix m³
Material Agregat Kelas A m³
Material Agregat Kelas B m³
batu Kapur pilihan m³
Semen warna kg
Semen Grouting Zak
Mortar siap pakai Kg
Kapur sirih Kg
Screen Kg
Patok Hm buah
Patok Km buah
Gorong-gorong beton tanpa tulang dia. 20 cm m'
Gorong-gorong beton tanpa tulang dia. 30 cm m'
Gorong-gorong beton bertulang dia. dlm 20 cm m'
Gorong-gorong beton bertulang dia. dlm 30 cm m'
Gorong-gorong beton bertulang dia. dlm 45 cm m'
Gorong-gorong beton bertulang dia. dlm 45-75 cm m'
Gorong-gorong beton bertulang dia. dlm 75-95 cm m'
Gorong-gorong beton bertulang dia. dlm 95-120 cm m'
Gorong-gorong beton bertulang dia. dlm 120-150 cm m'
Tiang Pancang (pole) square 25 m'
G Asesoris Perpipaan
Knie GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Socket GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Tee GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
ø 6" Buah
ø 8" Buah
ø 10" Buah
ø 12" Buah
ø 14" Buah
ø 16" Buah
D. Niple GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Water moor GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Flug GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Dop GI
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Flok-Soc GI
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Flok-Tee GI
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Flok-Nipple ring GI
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
Bend all flange
ø 2" x 90 Buah
ø 3" x 90 Buah
ø 4" x 90 Buah
ø 6" x 90 Buah
ø 8" x 90 Buah
Tee all flange
ø 100 mm ( 4" ) Buah
ø 150 mm ( 6" ) Buah
ø 200 mm ( 8" ) Buah
All reducer flange
ø 3" x 2" Buah
ø 4" x 2" Buah
ø 4" x 3" Buah
ø 6" x 3" Buah
ø 6" x 4" Buah
ø 8" x 4" Buah
ø 8" x 6" Buah
Gate Valve
ø 50 mm ( 2" ) Buah
ø 75 mm ( 3" ) Buah
ø 100 mm ( 4" ) Buah
ø 150 mm ( 6" ) Buah
ø 200 mm ( 8" ) Buah
ø 250 mm ( 10" ) Buah
ø 300 mm ( 12" ) Buah
ø 350 mm ( 14" ) Buah
ø 400 mm ( 16" ) Buah
ø 450 mm ( 18" ) Buah
ø 500 mm ( 20" ) Buah
ø 550 mm ( 22" ) Buah
ø 600 mm ( 24" ) Buah
ø 700 mm ( 28" ) Buah
ø 800 mm ( 32" ) Buah
Loose Flange
ø 40 mm ( 1½" ) Buah
ø 50 mm ( 2" ) Buah
ø 75 mm ( 3" ) Buah
ø 100 mm ( 4" ) Buah
ø 150 mm ( 6" ) Buah
ø 200 mm ( 8" ) Buah
ø 250 mm ( 10" ) Buah
ø 300 mm ( 12" ) Buah
ø 350 mm ( 14" ) Buah
ø 400 mm ( 16" ) Buah
ø 450 mm ( 18" ) Buah
ø 500 mm ( 20" ) Buah
ø 550 mm ( 22" ) Buah
ø 600 mm ( 24" ) Buah
Dop PVC
ø 50 mm ( 2" ) Buah
ø 75 mm ( 3" ) Buah
ø 100 mm ( 4" ) Buah
ø 200 mm ( 8" ) Buah
Tee PVC
ø ½" Buah
ø ¾" Buah
ø 1" Buah
ø 1½" Buah
ø 1¾" Buah
ø 2" Buah
ø 2½" Buah
ø 3" Buah
ø 4" Buah
ø 6" Buah
HARGA
4
194,274.00
182,676.00
166,729.00
157,643.00
HARGA
100,000.00
85,000.00
235,000.00
185,000.00
185,000.00
100,000.00
148,000.00
150,000.00
136,000.00
224,130.00
130,000.00
10,580.00
194,250.00
162,750.00
136,500.00
99,750.00
88,812.00
88,812.00
100,000.00
125,000.00
220,000.00
125,000.00
28,600.00
52,400.00
116,450.00
1,400.00
2,000.00
4,250.00
890.00
700.00
3,850.00
4,400.00
3,520.00
16,900.00
22,500.00
88,546.00
69,146.00
65,570.00
53,648.00
1,120.00
2,650.00
77,000.00
102,000.00
1,168,859.00
1,342,631.00
1,681,087.50
1,867,875.00
1,756,627.20
1,951,808.00
2,542,935.00
2,610,158.00
2,513,491.20
2,792,768.00
0.00
2,850.00
105,000.00
317,120.00
304,000.00
110,000.00
10,000.00
267,500.00
3,750.00
7,700.00
12,700.00
206,700.00
260,000.00
98,000.00
121,000.00
168,000.00
190,000.00
330,000.00
550,000.00
586,800.00
1,210,000.00
2,600,000.00
275,000.00
12,800.00
261,800.00
186,700.00
22,000.00
18,000.00
86,900.00
65,000.00
106,700.00
109,700.00
605,000.00
32,000.00
16,500.00
10,000.00
46,000.00
37,300.00
150,000.00
200,000.00
12,500.00
27,500.00
29,700.00
1,250.00
1,250.00
16,500.00
96,000.00
8,250.00
11,500.00
35,000.00
10,000.00
18,000.00
21,000.00
42,700.00
21,000.00
14,500.00
17,500.00
11,600.00
47,000.00
24,200.00
45,200.00
58,000.00
44,700.00
149,400.00
88,000.00
95,200.00
113,850.00
26,700.00
27,500.00
35,200.00
57,700.00
3,025,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,000,000.00
25,000.00
26,400.00
4,200.00
5,800.00
11,000.00
15,500.00
26,000.00
83,500.00
55,000.00
2,500.00
4,500.00
9,000.00
750,000.00
26,500.00
84,000.00
36,500.00
70,000.00
85,000.00
15,000.00
90,700.00
55,000.00
72,000.00
42,000.00
90,000.00
78,000.00
22,000.00
25,000.00
37,500.00
70,000.00
105,000
150,900
172,000
262,900
254,000
92,000.00
115,000.00
80,000.00
98,000.00
110,000.00
125,000.00
120,000.00
109,900.00
2,100.00
2,000.00
2,700.00
2,500.00
2,500.00
2,100.00
2,800.00
2,500.00
1,700.00
2,500.00
47,000.00
54,000.00
46,000.00
51,500.00
56,700.00
88,000.00
78,000.00
88,000.00
84,000.00
98,700.00
12,000.00
14,000.00
1,995,500.00
1,680,600.00
1,500,000.00
1,365,000.00
285,600.00
204,700.00
328,500.00
291,500.00
13,300.00
17,500.00
10,260.00
14,300.00
17,600.00
9,500.00
10,000.00
94,000.00
76,000.00
16,000.00
16,500.00
13,000.00
13,000.00
13,000.00
27,500.00
22,500.00
16,450.00
16,450.00
16,450.00
16,450.00
16,450.00
16,450.00
38,000.00
130,000.00
297,000.00
352,000.00
19,950.00
15,325.00
85,000.00
57,500.00
7,650.00
67,500.00
89,100.00
16,000.00
32,000.00
2,200.00
33,000.00
30,800.00
38,100.00
47,300.00
20,000.00
22,500.00
92,000.00
20,000.00
325,000.00
220,000.00
12,600.00
3,000
3,000
5,500
21,300
14,800
346,800
67,500.00
38,500.00
31,900.00
19,250.00
25,000.00
25,000.00
7,150.00
18,000.00
58,000.00
52,600.00
19,200.00
5,775.00
8,000.00
9,500.00
10,000.00
30,000.00
35,000.00
43,000.00
10,000.00
9,500.00
8,000.00
2,000.00
6,500.00
735.00
625.00
8,750.00
51,000.00
12,500.00
36,000.00
50,000.00
62,000.00
65,000.00
45,000.00
5,000.00
80,000.00
65,000.00
65,835.00
68,970.00
71,550.00
25,000.00
87,150.00
69,250.00
50,000.00
60,000.00
65,835.00
3,850.00
4,150.00
4,600.00
4,850.00
6,300.00
4,350.00
7,150.00
52,000.00
60,000.00
87,250.00
71,250.00
18,750.00
21,750.00
30,000.00
42,000.00
42,800.00
62,500.00
97,000.00
135,500.00
125,000.00
132,000.00
145,000.00
640,000.00
3,338,200.00
25,000.00
38,000.00
98,000.00
125,000.00
25,000.00
35,000.00
379,050.00
379,050.00
107,950.00
758,150.00
235,000.00
336,300.00
200,000.00
162,500.00
117,500.00
98,500.00
488,600.00
110,000.00
75,900.00
63,000.00
40,000.00
15,700.00
40,000.00
120,000.00
75,000.00
35,000.00
75,300.00
25,000.00
68,000.00
48,000.00
924,000.00
525,000.00
150,000.00
115,000.00
250,000.00
212,500.00
300,000.00
80,000.00
900,000.00
750,000.00
415,800.00
412,235.00
284,800.00
325,000.00
1,963,500.00
2,136,750.00
2,136,750.00
2,252,250.00
395,000.00
400,000.00
252,000.00
425,000.00
975,000.00
270,270.00
200,000.00
340,000.00
288,750.00
1,750,000.00
1,501,500.00
250,000.00
225,000.00
15,000.00
35,000.00
30,000.00
30,000.00
66,000.00
65,000.00
45,000.00
35,000.00
36,500.00
57,880.00
123,300.00
194,700.00
243,400.00
392,000.00
497,650.00
924,200.00
1,665,600.00
1,867,800.00
2,388,000.00
4,665,700.00
4,998,800.00
5,376,000.00
5,969,000.00
5,600,000.00
7,500,000.00
8,450,000.00
114,000.00
161,000.00
267,000.00
295,500.00
329,500.00
403,300.00
515,500.00
672,000.00
980,000.00
1,415,000.00
657,000.00
998,000.00
1,360,000.00
2,530,000.00
33,960.00
68,090.00
99,970.00
210,500.00
334,570.00
531,490.00
827,180.00
1,073,620.00
1,209,700.00
1,970,700.00
2,472,300.00
3,996,300.00
5,491,000.00
6,836,000.00
8,257,000.00
9,895,000.00
11,875,000.00
13,125,000.00
11,750.00
27,500.00
48,500.00
73,500.00
65,780.00
127,400.00
195,000.00
310,700.00
483,600.00
569,400.00
786,500.00
48,400.00
98,120.00
146,520.00
186,890.00
305,910.00
477,290.00
742,170.00
1,180,410.00
1,502,380.00
1,898,380.00
2,790,040.00
3,437,280.00
4,319,150.00
5,456,880.00
6,940,780.00
9,407,530.00
11,940,720.00
14,708,100.00
17,242,060.00
6,000.00
8,500.00
12,000.00
15,000.00
17,500.00
22,000.00
45,000.00
65,000.00
110,000.00
5,500.00
7,000.00
9,000.00
11,000.00
13,000.00
16,000.00
32,000.00
51,000.00
76,000.00
8,000.00
12,000.00
15,000.00
22,000.00
28,000.00
48,000.00
84,000.00
152,000.00
250,000.00
664,000.00
1,014,000.00
1,458,000.00
2,026,000.00
2,301,500.00
3,068,600.00
6,000.00
7,000.00
10,000.00
15,000.00
20,000.00
31,000.00
50,000.00
98,000.00
166,000.00
21,000.00
25,000.00
31,000.00
44,000.00
58,000.00
83,000.00
151,500.00
236,000.00
412,000.00
5,000.00
5,500.00
7,500.00
12,000.00
13,000.00
19,500.00
35,000.00
40,000.00
82,000.00
6,000.00
6,000.00
7,500.00
12,000.00
13,000.00
19,000.00
31,000.00
41,000.00
82,000.00
10,500.00
13,000.00
18,000.00
22,000.00
33,000.00
62,000.00
95,000.00
134,000.00
15,000.00
23,000.00
35,000.00
44,000.00
62,000.00
128,000.00
192,000.00
235,000.00
6,500.00
10,000.00
15,000.00
18,000.00
24,000.00
36,000.00
53,000.00
90,000.00
395,000.00
530,000.00
650,000.00
720,000.00
840,480.00
345,000.00
664,000.00
911,000.00
395,000.00
435,000.00
435,000.00
600,000.00
750,000.00
1,180,000.00
1,320,000.00
1,600,000.00
2,943,000.00
4,632,000.00
6,825,000.00
11,193,000.00
15,834,000.00
22,113,000.00
38,304,000.00
56,160,000.00
73,632,000.00
78,000,000.00
87,360,000.00
117,000,000.00
143,565,000.00
189,760,000.00
65,000.00
125,600.00
183,200.00
206,000.00
318,000.00
454,000.00
579,200.00
752,000.00
771,150.00
1,293,600.00
1,387,200.00
2,009,640.00
2,307,720.00
3,000,240.00
44,000.00
64,000.00
120,000.00
435,000.00
7,000.00
9,000.00
11,000.00
27,000.00
30,000.00
57,000.00
144,000.00
142,000.00
170,000.00
285,000.00
170,000.00
240,000.00
185,000.00
60,000.00
160,000.00
180,000.00
756,000.00
475,000.00
285,000.00
25,000.00
45,000.00
79,000.00
25,000.00
31,000.00
95,000.00
117,500.00
13,500.00
275,000.00
3,500,000.00
4,200,000.00
13,500,000.00
17,000,000.00
18,500,000.00
42,000,000.00
46,000,000.00
1,127,300.00
2,166,500.00
11,500.00
12,000.00
15,500.00
7,400.00
8,600.00
10,700.00
8,000.00
8,000.00
19,500.00
15,600.00
55,000.00
35,000.00
17,600.00
17,600.00
264,000.00
291,500.00
258,500.00
52,500.00
400,000.00
125.00
7,500.00
470,000.00
560,000.00
27,500.00
no jenis pekerjaan ukuran
l t
l
1 pek. Direksi keet
IV pek.beton lt 2
1 pek. Balok beton utama uk 15x35
2 pek. Balok beton anak uk 15x25
3 pek.plat lantai bondeck+wiremesh mm8 t=15cm
4 pek.tiang kolom lantai 2
5 pek,kolom kusen
6 pek balok lintel kusen
7 pek.topian beton
8 pek. Ring balok atas dinding/atap
9 pek.janggutan beton/lisplank beton
Vl pek.pasangan
1 pas.batu belah
2 pas.anstamping
3 pas.dinding bata merah
4 pas.plesteran
5 pas.acian
VIII pek.atap
1 pas. Kontruksi atap baja ringan
2 pas. penutup atap genteng metal+alm foil
3 pas.. Bubungan
4 pas,atap canopy polucarbonat rangka besi
IX pek.plafond
1 pas.gypsum 9 mm+rangka holo galvanis
2 pas. List profil
X pek lantai
1 urugan pasir di bawah lantai
2 pluran/lantai kerja
3 pas.keramik uk 40x40 tektur untuk teras depan
4 pas.keramik uk 40x40 polos untuk ruangan
5 pas.keramik uk 40x40 kasar untuk t.jemur
6 pas. Keramik 20x20 kasar untuk lt km
7 pas.keramik 20x25 untuk dindng km , t=3 meter
x pek.listrik
1 pas.instalasi titik lampu+out let saklar
2 pas.instalasi stop kontak
3 pas.box sekrung+mcb
4 kabel jalur
5 sambungan listrik pln
6 lampu downlight 4''
Xi pek.pengecatan
1 pengecatan dinding bagian luar/exterior dgn cat dulux
weathersield setara
2 pengecatan dinding bagian dalam/interior dgn vinilex
3 pengecatan dinding samping cat kedap air nodrop
4 pengecatan plafond gypsum dengan vinilex
panjang
balok lintel
pj1 3
pj2 2.2
pj3 1.25
p1 0.7
p2 0.9
j1 1.8
j2 1.35
j3 1.15
j4 2.15
bv 1
volume kaca pj1 1.452
1.669
pj2 0.996
0.802
1.356
pj3 0.75
0.193
0.943
j1 0.665
0.583
j2 1.089
0.608
0.462
j3 0.477
0.335
j4 0.14
1.279
1.032
bv 0.202
LUAS P
VOLUME TANGGA
1.09 M2 0.95
0.68 0.95
74.92 m1
0.20 0.072
0.20 0.128
unit m
3
2.2
11 13.75
11 7.70
2 1.8
1.8
1.35
3 3.45
19 19
0.1 0.15 0.81 m2
54.05 m1
type kusen
pj1
pj2
1.17 pj3
0.9 j1
0.31 j2
j3
j4
2.38 p2
bv
atap
bubung
2 2.904
2 3.338
6.242 1 6.242
2 1.992
0.802
1.356
4.15 1 4.15
20 18.86
4 2.66
2 1.166
3.826 1 3.826
1.089
2 1.216
0.462
2.767 1 2.767
2 0.954
0.335
1.289 3 3.867
3 0.42
2 2.558
1 1.032
4.01 1 4.01
2 0.404 19 7.676
3.25
51.398 m2
M1 1.0355
0.646
1.6815 M3
galian pondasi as b 2.57
1.50
10.24
14.31 14.31
as c 12.53 12.53
as d 12.32 12.32
as e 12.07 12.07
as f 11.82 11.82
as g 11.72 11.72
as h 11.46 11,46 ponds setengah
as 1 21.06 21.06 ponds setengah
as 2 15.73
as 3 15.39
as 4 21.25 pods setengah
benteng dpn 13.4 ponds setengah
1.60
1.35
1.35
1.65
1.35
1.62
1.35
1.64
1.35
1.75
1.35
1.65
1.35
1.35
1.65
1.65
1.35
1.35
2.5
1.65
4.22
1.30
197.98 m1 2 98.99
m3 titik
poer beton 0.80 0.80 0.64 0.3 0.192 6
rospal
197.98
balok utama as
b1 a 12.93
b 12.76
c 12.53
d 12.32
e 8.23
f 11.82 dim
g 11.72 0.15 0.35 0.35
h 11.46
1 18.39
2 21.07
3 21.08
4 17.41
m3
171.72 m1 0.35 60.102
128.19 m1
93.44
7.05
224.82 0.15
balok dak atap bd1 5.85 0.15 0.25 0.0375
7.05
5.85
11.74
12.04
11.09
11.1
1
65.72 m1
38.1 m1
22.54 0.15
0.15 0.15
topian beton 0.5 4.24
p t
pas bata lt1 228.72 m1 3.1
volume kusen lt1
j1 2.5 1.8 4.500
j2 2.5 1.35 3.375
pj1 2.5 3 7.5
j3 1.5 1.15 1.725 224 2.47
pj2 2.5 2.2 5.5 2.79
7.44
22.600 1.57
pj3 2.5 1.25 3.125 9 28.125 4.33
p1 1.95 0.7 1.365 9 12.285
40.410 18.6
22.600
6.48
3.12
9.12
5.2
10.64
0.78 4 3.12 j1
0.84 4 3.36
6.48
0.78 4 3.12 j2
1.07 2 2.14 j3
0.45 2 0.9
3.04 3 9.12 j3
1.93 2 3.86 j4
0.67 2 1.34
5.2
71 48.64 119.64
LUAS LANTAI M2
302.25 303.85
35
DINDING KM 3.2
1 RUANG 3.65
4.57
3.65
15.07
1/2'' 4
0.7
0.25
7
11.95 20 239 4 59.75
3/4'' 26
13
10
13
8
18
88 4 22
LT2 3'' 38 2 76 M1 4
59 M1 4
LT2 26
7
7
26
66 125 4
14
5
7
26
stop kontak 21 3 63
65
lampu lt1 45
lt2 51
96
DL4' LT1 20
LT2 26 60 4 240
46 200
DL3'' LT1 18 50 4
LT2 22
40
5 2 10 14 140 m1
280 4 70
250 4 62.5
1 kmr
kabel lt1 13 3.5
8 4
4 6
9 13.5 10 135
34 34
169 2
166 2 332
118
450
118
568
179 2 358
95.12
453.12 2584.088
22.12
4 13
4.20
22 0.15 3.3 7 0.4714285714
0.9 4 3.6
m2
0.40
89.091 m3
20.7879 m3
m3
1.152
1.296
1.024
2.71125
4.1319
12.00975
2.3625
14.37225
4.807125
tinggi m3 ttk vol
3.35 0.201 32 6.432
2.8032
34.7805
33.723
2.4645
1.7145
3.381
2.1624 titik
4 17.36
4 12.32
0.015 0.4005
plesteran 2
acian
70
2 2584.088
205.4
1.36 4 5.44
0.84
6.28
1.8 4 7.2
1.6 4.3
4 4.6
p daun jendela dan pintu
12.36
5.35
13.03
5.39
16.92
5.41
15.83
13.15
5.39
13.64
5.4 74 3 222 156.000
13.46
5.39
13.83
5.39 1,200.00 70 84,000.00 1200
14.09
5.29
14.2
5.39
14.28
5.39 9 4
13.75
5.39
29.8
257.52 523.97 9 4
150,000.00
303.85 9.1155
6.85 151.40
9 15.75
11 19.25
20 301.4
6.25
19
14.75
16.5
31.25
10.55
16 81
4 50
12.5
2 280
12000 840000
338 m1 13000 4,394,000.00
453.12
128
581.12 2002.968
4 3.14
4 0.2826
646.022 m2
646.022 1292.044
18.457771428572
34,632.00
100,800,000.00
36 21 756 2 1512
36 10 360 2 720
108,000,000.00
dimensi
no pekerjaan berat lebar tinggi panjang
dimensi
no pekerjaan berat lebar tinggi panjang
dimensi
no pekerjaan berat lebar tinggi panjang
bekisting
dimensi
no pekerjaan berat lebar tinggi panjang
dimensi
no pekerjaan berat lebar tinggi panjang
dimensi
no pekerjaan berat lebar tinggi panjang
dimensi
no pekerjaan berat lebar tinggi panjang
besi o 8
begel
0.46 0.2 0.66
202.27273 m1
panjang besi 12
besi o 8 154.41 kg
coran 0.4005 m2
besi o8 jarak 15
pjng
8 melintang 2.44 0.15
memanjang 4.25 0.15
berat perkilo
berat total
kebutuhan besi
besi o 12
panjang besi /tirik 1.6 m1 kilo
berat perbatang 10.7 1.3 13.91
berat perkilo 0.89
12.02247
dimensi
no pekerjaan berat lebar tinggi panjang
dimensi
no pekerjaan berat lebar tinggi panjang
bekisting
dimensi
no pekerjaan berat lebar tinggi panjang
bekisting
dimensi
no pekerjaan berat lebar tinggi panjang
bekisting
dimensi
no pekerjaan berat lebar tinggi panjang
bekisting
dimensi
no pekerjaan berat lebar tinggi panjang
bekisting
dimensi
no pekerjaan berat lebar tinggi panjang
0.03 m3 pembagi
0.03 m3
1 m3
4 3.56 kg
118 kg
10 5.07 kg
169 kg
10 m3
0.045 m3 pembagi
0.045 m3
1 m3
6 5.34 kg
118.67 kg
10 5.07 kg
112.67 kg
10 m3
0.06 m3 pembagi
0.06 m3
1 m3
2 1.78 kg
29.67 kg
10 5.07 kg
84.50 kg
10 m3
6 9.48 kg
158
10 m3
0.0225 m3 pembagi
0.0225 m3
1 m3
4 3.56 kg
158.22 kg
10 5.07 kg
225.33 kg
10 m3
0.0144 m3 pembagi
0.0144 m3
1 m3
4 2.48 kg
172.22 kg
10 5.07 kg
352.08 kg
10 m3
0.012 m3 pembagi
0.012 m3
1 m3
4 2.48 kg
206.67 kg
10 5.07 kg
422.50 kg
10 m3
pembagi
1.00
janggutan
p janggutan
0.4005 m2
m1 p/btng btng
7 186.9 12 15.575
2 1.32
jmh cincin
1.32 26.7 0.1 267
cincin
kg
80.58
16.26667
28.33333
kilo
45 btng total 4.74 213.3 kilo
0.39
analisa
0.128 m3 8 bh 1.024
berat/kilo
12 24 m1 2 btng besi 12 0.89
berat perbatang
10.7
12 0.89
titik v beton
0.072 18 1.296 m3
10 16 m1
14.26666667 16.03
kilo
0.0525 m3
0.0525 m3 beton 1,228,006.81
1 m3 besi 10 9,134.13
2 1.24 kg besi 8 7,208.74
23.62 kg besi D13 13,199.73
BEKISTING 433,835.59
10 5.07 kg
96.57 kg
10 m3
5 5.2 m3
99.05 kg
10 kg
0.0525 m3
0.0525 m3 beton 1,228,006.81
1 m3 besi 12 11,293.98
4 3.56 kg besi 8 7,208.74
67.81 kg
BEKISTING 433,835.59
10 5.07 kg
96.57 kg
10 m3
0.03 m3
0.03 m3 beton
1 m3 besi 12 11,293.98
4 3.56 kg besi 8 7,208.74
118.67 kg
BEKISTING 433,835.59
10 5.07 kg
169.00 kg
10 m3
6
jumlah volume satuan ANALISA
1.7010 m3 beton
besi 12 11,293.98
6 21.36 kg besi 8 7,208.74
1 3.12 kg
4 0.2835 24 21.36
0.0375 m3
0.0375 m3 beton 1.00
1 m3 besi 10 11,293.98
5 4.45 kg besi 8 7,208.74
118.67 kg besi D13 13,199.73
BEKISTING 433,835.59
10 5.07 kg
135.20 kg
2 1.24 kg
33.07 kg
10 m3
0.045 m3
0.03 m3 beton 1.00
1 m3 D13 13,199.73
5 4.45 kg besi O 8 7,208.74
98.89 kg besi O 10 9,134.13
BEKISTING 433,835.59
10 5.07 kg
112.67 kg
2 1.24 kg
27.56 kg
10 m3
beton 1.04
O 12
56 1500.8
BEKISTING 433,835.59
12
34 408
1,228,006.81 1,228,006.81
11,293.98 1,332,689.11
7,208.74 1,218,277.15
272,867.26 2,728,672.63
6,507,645.71
- 1,228,006.81
11,293.98 1,340,218.43
7,208.74 812,184.77
272,867.26 2,728,672.63
6,109,082.64
- 1,228,006.81
11,293.98 335,054.61
7,208.74 609,138.58
18,556.62 2,931,945.26
188,654.73 1,886,547.30
6,990,692.55
1,228,006.81
11,293.98 1,786,957.91
7,208.74 1,624,369.54
188,654.73 1,886,547.30
6,525,881.56
1,228,006.81
9,134.13 1,573,099.40
7,208.74 2,538,077.40
188,654.73 1,886,547.30
7,225,730.91
1,228,006.81
9,134.13 1,887,719.28
7,208.74 3,045,692.88
340,235.59 3,402,355.91
9,563,774.88
1,228,006.81
7,208.74 1,113,101.63
433,835.59 433,835.59
2,774,944.03
berat/btng kg
4.74 73.83
8,728,565.92
1,499,287.56
2,266,635.95
0.8 0.8 0.3 0.192 6
28 m1
2,322,623.22
VOLUME
1,228,006.81
215,739.35
696,158.37
1,307,401.39
433,835.59
3,881,141.50
VOLUME/m3
1,228,006.81
765,839.10
696,158.37
433,835.59
3,123,839.87
VOLUME/m3
1,228,006.81
1,340,218.43
1,218,277.15
433,835.59
4,220,337.98
VOLUME/m3
1,228,006.81
241,239.32
22,491.27
1,491,737.40
VOLUME/m3
1,228,006.81
373,454.12
974,621.72
1,566,367.43
433,835.59
4,576,285.68
VOLUME/m3
1,228,006.81
1,305,306.19
812,184.77
903,263.53
433,835.59
4,682,596.89
VOLUME/m3
1,228,006.81 1,273,443.06
24,784.38 10,112,025.22 besi
433,835.59
1,686,626.77 11,385,468.28
11,819,303.87
1.037
1.152
HARGA SATUAN PEKERJAAN KONSTRUKSI BETON BERTULANG
1 1 M3 COR BETON SITE MIX K.175 ……………………..Analisa 100.37
2 1 M3 COR BETON K.-225 READY MIX MI ……………………..Analisa 100.38
3 1 KG BETON TERPASANG U. 24 ……………………..Analisa 100.43
4 1 KG BESI BETON TERPASANG U. 39 ……………………..Analisa 100.44
5 1 M2 BEKISTING DENGAN PAPAN ……………………..Analisa 100.34
6 1 M2 BEKISTING MULTIPLEX 9 MM ……………………..Analisa 100.35
7 1 M2 PAS. STOOT WERK ……………………..Analisa 100.36
HARGA
NO. URAIAN PEKERJAAN KOEFISIEN SAT
SATUAN (Rp)
1 1M3 PONDASI FOOT PLATE, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 #VALUE!
- Bekisting papan 2.0000 m2 113,630.00
- Besi beton terpasang U.24 180.0000 kg 19,310.00
JUMLAH
2 1M3 SLOOF 15 X 20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting papan 13.3333 m2 113,630.00
- Besi beton terpasang U.24 120.0000 kg 19,310.00
JUMLAH
3 1M3 SLOOF 15 X 25 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting papan 13.3333 m2 113,630.00
- Besi beton terpasang U.24 120.0000 kg 19,310.00
JUMLAH
4 1M3 KOLOM PRAKTIS 12X12 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting papan 16.6667 m2 113,630.00
- Besi beton terpasang U.24 120.0000 kg 19,310.00
JUMLAH
5 1M3 KOLOM TEMBOK 15X20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting Multiplek 9mm 13.3333 m2 106,843.00
- Besi beton terpasang U.24 150.0000 kg 19,310.00
JUMLAH
6 1M3 KOLOM 20X20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting Multiplek 9mm 20.0000 m2 106,843.00
- Besi beton terpasang U.24 150.0000 kg 19,310.00
JUMLAH
7 1M3 BALOK 20X30 CM, READY MIX K.225
- Adukan Beton (Ready Mix K.225) 1.0000 m3 1,045,299.00
- Bekisting Multiplek 9mm 13.3333 m2 106,843.00
- Besi beton terpasang U.24 180.0000 kg 19,310.00
- Pasang Stut Werk 3.3333 m2 305,371.00
JUMLAH
8 1M3 BALOK 12X20 CM, SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting Multiplek 9mm 21.6667 m2 106,843.00
- Besi beton terpasang U.24 150.0000 kg 19,310.00
JUMLAH
9 1M3 RINGBALK 12X20 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting papan 16.6667 m2 113,630.00
- Besi beton terpasang U.24 110.0000 kg 19,310.00
JUMLAH
10 1M3 PLAT KANOPI BETON T=7CM, BETON SITE MIX K.75
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Bekisting Multiplek 9mm 14.2857 m2 106,843.00
- Besi beton terpasang U.24 100.0000 kg 19,310.00
- Pasang Stut Werk 1.7857 m2 305,371.00
JUMLAH
11 1M3 LANTAI BETON WIREMESH T=15 CM, BETON SITE MIX K.175
- Adukan Beton (Site Mix K.175) 1.0000 m3 977,570.00
- Wiremesh M8 1.0000 m2 20,000.00
JUMLAH
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
- Pekerja L.01 O/H 1.650 157,643.00
- Tukang Bat L.02 O/H 0.275 182,676.00
- Kepala Tuk L.03 O/H 0.028 182,676.00
- Mandor L.04 O/H 1.650 194,274.00
JUMLAH TENAGA KERJA
B BAHAN
- Semen PortM.15 kg 384 56,000.00
- Pasir Beto M.14.a kg 692 235,000.00
- Kerikil M.12 kg 1,039 237,000.00
- Air M.02 liter 215
JUMLAH HARGA BAHAN
C PERALATAN
- Molen kap.E.29.b sewa/hari 0,250
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Over head & Profit (maksimum 15 % x D) 10%
F Harga Satuan Pekerjaan (D + E)
PERMEN PUPR NO.28/PRT/M/2016, KOEFISIEN AHSP BIDANG CIPTA KARYA
ERTULANG
977,570.00
1,045,299.00
19,310.00
19,547.00
113,630.00
106,843.00
305,371.00
JUMLAH (Rp)
977,570.00
227,260.00
3,475,800.00
4,680,630.00
977,570.00
1,515,066.67
2,317,200.00
4,809,836.67
977,570.00
1,515,066.67
2,317,200.00
4,809,836.67
977,570.00
1,893,833.33
2,317,200.00
5,188,603.33
977,570.00
1,424,573.33
2,896,500.00
5,298,643.33
977,570.00
2,136,860.00
2,896,500.00
6,010,930.00
1,045,299.00
1,424,573.33
3,475,800.00
1,017,903.33
6,963,575.67
977,570.00
2,314,931.67
2,896,500.00
6,189,001.67
977,570.00
1,893,833.33
2,124,100.00
4,995,503.33
977,570.00
1,526,328.57
1,931,000.00
545,305.36
4,980,203.93
977,570.00
20,000.00
997,570.00
a (K-250) Kedap Air, Slump (12 ± 2) cm, w/c = 0.56
Jumlah Harga
(Rp.)
260,110.95
50,235.90
5,114.93
320,552.10
636,013.88