I PEKERJAAN PERSIAPAN
1 Pengukuran & Bouwplank 1,300.00 M2
2 Pembersihan Lokasi ( TEBANG POHON ) 1.00 Ls
3 Direksi keet dan Gudang 24.00 M2
4 Air Kerja 8.00 Bln
5 Listrik Kerja 8.00 Bln
6 Mobilisasi / Demobilisasi 8.00 Bln
7 Keamanan Lingkungan 8.00 Bln
Sub Jumlah I
II PEKERJAAN TANAH & URUGAN
1 Galian Tanah Pile Cap 5.86 m3
2 Galian Sloof 35.00 M3
3 Urugan Pasir Dibawah Pondasi 1.75 M3
4 Urugan Pasir Dibawah Sloof 3.50 M3
5 Lantai Kerja Dibawah Pondasi Setempat 7.56 M2
6 Lantai Kerja Dibawah Sloof 96.00 M2
7 Pekerjaan TANAH URUGAN 845.00 m3
Sub Jumlah II
III PEKERJAAN STRUKTUR BETON
1 Borpile dia' 30 cm dengan kedalaman 12 m' 775.00 m'
2 Pile Cap 5.30 m2
3 Sloof uk. 25/60 cm 35.00 M3
4 Rabat Beton t. 10 cm (pembesian 1 lapis) 15.27 M3
Sub Jumlah III
IV PEKERJAAN STRUKTUR RANGKA BAJA
1 STRUKTUR RANGKA ATAP BAJA 1,300.00 m2
2 ATAP SPANDEK 1,300.00 m2
3 Alumunium foil 1,300.00 m2
Sub Jumlah IV
V PEKERJAAN DINDING
1 Pas. Dinding hebel 10 cm 453.00 M2
2 Plester + Aci 906.00 M2
Sub Jumlah V
VI PEKERJAAN PLAFOND
1 Pasang plafond gypsum rangka hollow 2/4 dan 4/4 ex. Jaya Board 1,300.00 M2
2 Plafond Dome 3.00 Unit
Sub Jumlah VI
VII PEKERJAAN PENGECATAN
NO URAIAN PEKERJAAN VOL. SAT.
88,636.42 115,227,343.97
-
831,127.85 19,947,068.48
-
-
-
-
135,174,412.45
129,360.75 758,053.98
77,160.82 2,700,628.58
275,134.55 481,485.47
275,134.55 962,970.93
964,851.27 7,294,275.62
964,851.27 92,625,722.20
45,227.48 38,217,217.90
143,040,354.69
364,634.26 282,591,554.79
-
-
-
282,591,554.79
197,926.23 257,304,104.64
-
- -
257,304,104.64
181,498.75 82,218,933.32
70,133.43 63,540,891.01
145,759,824.33
174,052.21 226,267,878.32
-
226,267,878.32
HARGA JUMLAH
SATUAN HARGA
33,620.33 43,706,433.20
28,453.26 25,778,652.82
69,485,086.02
1,259,623,215.23
Tri wicoro
Pekerjaan Dapur Jagakarsa
HARGA JUMLAH
NO URAIAN PEKERJAAN VOL. SAT.
SATUAN HARGA
I PEKERJAAN PERSIAPAN
1 Pekerjaan Batu 1.00 Ls 897,600.00 897,600.00
2 Pekerjaan Listrik
* Titik stop kontak 9.00 Ttk 225,000.00 2,025,000.00
* Titik Instalasi TV 1.00 Ttk 225,000.00 225,000.00
* Pasang Armamatur lampu 2.00 Bh 27,500.00 55,000.00
* Stop kontak 7.00 Bh 55,000.00 385,000.00
* Soket TV 1.00 Bh 155,000.00 155,000.00
* Soket Telpon 1.00 Bh 147,500.00 147,500.00
Sub Jumlah I 3,890,100.00
Tri Wicoro
Pekerjaan Perbaikan Bocor di Bumi Karang Indah
HARGA JUMLAH
NO URAIAN PEKERJAAN VOL. SAT.
SATUAN HARGA
I PEKERJAAN PERSIAPAN
1 Pak Datam 3.00 Hri 120,000.00 360,000.00
2 Wanto 2.00 Hri 100,000.00 200,000.00
3 Blanja keramik + asesories
- Dop 1/2' 1.00 Bh 5,000.00 5,000.00
- Lem pvc 1.00 Bh 7,500.00 7,500.00
- Amplas 1.00 Lbr 3,000.00 3,000.00
- Kramik 20x20 1.00 Bok 69,000.00 69,000.00
- Kran air bersih 1.00 Bh 125,000.00 125,000.00
- Nat kramik 1.00 Bks 15,000.00 15,000.00
'- Stop kontak broco 3.00 Bh 13,500.00 40,500.00
Tri Wicoro
ANALISA HARGA SATUAN PEKERJAAN
PERATURAN MENTERI PU NO. 28/PRT/M/2016
A TENAGA
1 Pekerja L.01 OH 0.052
2 Tukang Batu L.02 OH 0.010
3 Mandor L.04 OH 0.119
B BAHAN
1 Tiang Pancang Beton dia.25 cm m' 1.000
C PERALATAN
1 Tripod tinggi 7 m Sewa-hari 0.080
2 Alat Pancang + Hammer 2 ton Sewa-hari 0.080
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.650
2 Tukang Batu L.02 OH 0.065
3 Mandor L.04 OH 0.007
B BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Tukang kayu L.02 OH 0.340
2 Kepala Tukang L.03 OH 0.034
3 Mandor L.04 OH 0.034
B BAHAN
Baja ringan C 75.75 m 4.000
Roof Bottom/Reng R 33-0.45 m' 3.000
Self drilling screw dia 6 x 20 mm (truss Screw) bh 40.00
Dynabol dia 12 x 120 mm bh 0.500
Alumunium Foil DS m2 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10%
F Harga Satuan Pekerjaan (D+E)
EKERJAAN
/PRT/M/2016
RUKTUR
109,126.15 5,674.56
119,564.31 1,195.64
154,674.46 18,406.26
25,276.46
306,209.23 306,209.23
306,209.23
100,000.00
180,000.00
-
331,485.69
x D 33,148.57
364,634.26
109,126.15 70,932.00
119,564.31 7,771.68
154,674.46 1,005.38
79,709.06
-
79,709.06
x D 7,970.91
87,679.97
119,564.31 40,651.86
145,185.23 4,936.30
154,674.46 5,258.93
50,847.09
18,978.46 75,913.85
6,642.46 19,927.38
400.00 16,000.00
9,489.23 4,744.62
12,500.00 12,500.00
129,085.85
179,932.94
x D 17,993.29
197,926.23
ANALISA HARGA SATUAN PEKERJAAN
PERATURAN MENTERI PU NO. 28/PRT/M/2016
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang Kayu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
B BAHAN
1 Kayu Balok klas 3 m3 0.012
2 Paku segala ukuran Kg 0.020
3 Kayu Papan Kelas III Lbr 0.007
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.200
2 Tukang Batu L.02 OH 0.400
3 Kepala Tukang L.03 OH 0.400
4 Mandor L.04 OH 0.120
B BAHAN
1 Keyu meranti usuk 5/7 m3 0.125
2 Triplek Tebal 4mm lbr 1.000
3 Fondasi pasangan batu m3 0.170
4 Plafon asbes 3 mm lbr 1.240
5 Paku segala ukuran kg 0.750
6 Asbes Gelombang 0.92mx2.5m x 5mm Kg 0.300
7 Paku Payung Liter 0.400
8 Floor lantai (Beton lantai kerja) m3 0.150
9 Pintu Double teakwood rangka kayu m2 0.100
10 Cat dinding/plafon m2 16.500
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Kayu L.02 OH 2.000
3 Kepala Tukang L.03 OH 0.200
4 Mandor L.04 OH 0.050
B BAHAN
1 Keyu meranti usuk 5/7 m3 0.070
2 Paku segala ukuran Kg 0.300
3 Semen PC 50 kg Kg 9.000
4 Pasir Cor / Beton m3 0.030
5 Koral Beton 2/3 m3 0.050
6 Seng gelombang BJLS 30 Lbr 1.500
7 Seng plat Lbr 0.250
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.200
2 Tukang Kayu L.02 OH 0.400
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.020
B BAHAN
1 Dolken kayu klas III 7 - 10 cm, pjg 3 m Batang 1.250
2 Semen PC 50 kg Kg 2.500
3 Seng gelombang BJLS 30 lbr 1.000
4 Pasir Cor / Beton m3 0.005
5 Kayu Balok klas 3 m3 0.036
6 Paku segala ukuran Kg 0.060
7 Cat meni Liter 0.450
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.563
2 Mandor L.02 OH 0.056
B BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.675
2 Mandor L.02 OH 0.068
B BAHAN
C PERALATAN
1 Dump Truck Jam 0.067
2 Ekscavator Jam 0.067
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.356
2 Mandor L.02 OH 0.018
B BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.330
2 Mandor L.02 OH 0.033
B BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.300
2 Mandor L.02 OH 0.027
B BAHAN
1 Pasir Urug / Tanah katel. m3 1.200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
AHSP PEKERJAAN PONDASI
A TENAGA
1 Pekerja L.01 OH 1.500
2 Tukang Batu L.02 OH 0.750
3 Kepala Tukang L.03 OH 0.075
4 Mandor L.04 OH 0.075
B BAHAN
1 Batu Kali 5/7 m³ 1.200
2 Semen PC 50 kg kg 202.000
3 Pasir Pasang m³ 0.485
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 2.400
2 Tukang Kayu L.02 OH 0.800
3 Kepala Tukang L.03 OH 0.080
4 Mandor L.04 OH 0.119
B BAHAN
1 Batu Kali 5/7 m3 0.450
2 Semen PC 50 kg Kg 194.000
3 Pasir Cor / Beton m3 0.312
4 Kerikil 2/3 m3 0.468
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 1.500
2 Tukang Kayu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.022
4 Mandor L.04 OH 0.083
B BAHAN
1 Semen PC 50 kg zak 4.940
2 Pasir Cor / Beton m3 0.621
3 Kerikil 2/3 kg 0.555
4 Air Liter 150.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A Tenaga Kerja
1 Pekerja L.01 OH 0.050
2 Tukang Besi L.02 OH 0.050
3 Kepala Tukang L.03 OH 0.005
4 Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
1 Baja Tulangan U-39 Ulir kg 10.500
2 Kawat Beton / Bendrat kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
Pembesian 100 kg jaring kawat (Wiremesh) untuk pelat atau dinding
A Tenaga Kerja
1 Pekerja L.01 OH 0.025
2 Tukang Besi L.02 OH 0.025
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
1 Baja Wiremesh untuk pelat lantai beton kg 10.200
2 Kawat Beton / Bendrat kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
1 m3 beton mutu f'c = 22 Mpa (K275) menggunakan ready mixed dan bahan aditif
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Batu L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.100
B BAHAN
1 Beton Ready Mixed K-275 m3 1.020
C PERALATAN
1 Pompa dan conveyor beton Sewa-hari 0.102
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
1 m3 beton mutu f'c = 22 Mpa (K300) menggunakan ready mixed dan bahan aditif
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Batu L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.100
B BAHAN
1 Beton Ready Mixed K-300 m3 1.020
C PERALATAN
1 Pompa dan conveyor beton Sewa-hari 0.102
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
1 m3 beton mutu f'c = 22 Mpa (K450) menggunakan ready mixed dan bahan aditif
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Batu L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.100
B BAHAN
1 Beton Ready Mixed K-300 m3 1.020
C PERALATAN
1 Pompa dan conveyor beton Sewa-hari 0.102
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.180
2 Tukang Batu L.03 OH 0.020
3 Tukang Kayu L.03 OH 0.020
4 Tukang Besi L.03 OH 0.020
5 Kepala Tukang L.03 OH 0.006
6 Mandor L.04 OH 0.009
B BAHAN
1 Kayu Papan Kelas III m3 0.002
2 Paku segala ukuran Kg 0.010
3 Minyak bekisting Ltr 0.150
4 Baja Tulangan U-24 (besi beton biasa) Polos Kg 3.000
5 Kawat Beton / Bendrat Kg 0.450
6 Semen PC 50 kg Kg 4.000
7 Pasir Cor / Beton m3 0.006
8 Koral Beton 2/3 m3 0.009
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
B BAHAN
1 Kayu Papan Kelas III m3 0.002
2 Paku segala ukuran Kg 0.010
3 Minyak bekisting Ltr 0.150
4 Baja Tulangan U-24 (besi beton biasa) Polos Kg 3.600
5 Kawat Beton / Bendrat Kg 0.050
6 Semen PC 50 kg Kg 4.000
7 Pasir Cor / Beton m3 0.009
8 Koral Beton 2/3 m3 0.015
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
Floor Lantai
A TENAGA
1 Pekerja L.01 OH 0.175
2 Tukang Batu L.02 OH 0.175
3 Kepala Tukang L.03 OH 0.018
4 Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC 50 kg kg 1.25
2 Pasir Cor / Beton m3 0.52
3 Kerikil 2/3 m3 0.86
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.060
2 Tukang Batu L.02 OH 0.060
3 Kepala Tukang L.03 OH 0.005
4 Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
1 Floor Hardener Kg 5.00
JUMLAH HARGA BAHAN
C PERALATAN
1 Alat Bantu ls 1.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.260
2 Tukang Kayu L.02 OH 0.130
3 Kepala Tukang L.03 OH 0.013
4 Mandor L.04 OH 0.013
B BAHAN
1 Triplek Tebal 12mm Lbr 0.120
2 Paku segala ukuran kg 0.300
3 Minyak bekisting L 0.100
Jumlah pemakaian Bekisting 2x
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.500
2 Tukang Kayu L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.005
B BAHAN
Kayu kelas III
1 Paku segala ukuran kg 0.300
2 Minyak bekisting ltr 0.200
3 Kayu Balok klas 3 m³ 0.015
4 Triplek Tebal 9mm Lbr 0.185
5 Dolken kayu klas III 7 - 10 cm, pjg 3 m btng 1.000
Jumlah pemakaian Bekisting 2x
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
Dibuat Insitu 1 m2 bekisting Balok Beton Biasa dengan Multflex 12 mm atau 18 mm (tanpa perancah)
No Uraian Kode Satuan Koefisien
A TENAGA
1 Pekerja L.01 OH 0.500
2 Tukang Kayu L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.005
B BAHAN
1 Kayu Papan Kelas III m³ -
2 Paku segala ukuran kg 0.400
3 Minyak bekisting ltr 0.200
4 Kayu Balok klas 3 m³ 0.009
5 Triplek Tebal 9mm lbr 0.175
6 Dolken kayu klas III 7 - 10 cm, pjg 3 m btng 2.000
Jumlah pemakaian Bekisting 2x
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.500
2 Tukang Besi L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.005
B BAHAN
1 Kayu Papan Kelas III m³ -
2 Paku segala ukuran kg 0.400
3 Minyak bekisting ltr 0.200
4 Kayu Balok klas 3 m³ 0.015
5 Triplek Tebal 9mm lbr 0.175
6 Dolken kayu klas III 7 - 10 cm, pjg 3 m btng 2.000
Jumlah pemakaian Bekisting 2x
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.500
2 Tukang Besi L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.005
B BAHAN
1 Kayu Papan Kelas III m3 -
2 Paku segala ukuran m3 0.400
3 Minyak bekisting kg 0.200
4 Kayu Balok klas 3 L 0.010
5 Triplek Tebal 9mm Lbr 0.175
6 Dolken kayu klas III 7 - 10 cm, pjg 3 m btng 3.000
Jumlah pemakaian Bekisting 2x
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.330
2 Tukang Kayu L.02 OH 0.165
3 Kepala Tukang L.03 OH 0.017
4 Mandor L.04 OH 0.017
B BAHAN
1 Kayu Papan Kelas III m3 0.015
2 Paku segala ukuran kg 0.400
3 Minyak bekisting L 0.150
4 Kayu Balok klas 3 m3 0.008
5 Triplek Tebal 9mm m2 0.175
6 Dolken kayu klas III 7 - 10 cm, pjg 3 m btg 1.000
Jumlah pemakaian Bekisting 2x
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.175
2 Tukang Besi L.02 OH 0.175
3 Kepala Tukang L.03 OH 0.018
4 Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
1 Rangka Metal Furring 40.40.1,2 M1 4.00
2 Assesoris (perkuatan. las dll)
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.060
2 Tukang Besi L.03 OH 0.060
3 Kepala tukang L.03 OH 0.006
4 Mandor L.04 OH 0.003
B BAHAN
1 Baja Profil Kg 1.150
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.043
2 Tukang Besi L.03 OH 0.043
3 Kepala tukang L.03 OH 0.004
4 Mandor L.04 OH 0.002
B BAHAN
1 Aluminium 3" m 1.100
2 Skrup fixer buah 2.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.043
2 Tukang Besi L.03 OH 0.043
3 Kepala tukang L.03 OH 0.004
4 Mandor L.04 OH 0.002
B BAHAN
1 Alumunium frame Pintu 3" Coklat/Hitam m 1.100
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.085
2 Tukang Besi L.03 OH 0.085
3 Kepala tukang L.03 OH 0.009
4 Mandor L.04 OH 0.004
B BAHAN
1 Alumunium frame Pintu 3" Coklat/Hitam m 1.050
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.085
2 Tukang Kayu L.03 OH 0.085
3 Kepala tukang L.03 OH 0.009
4 Mandor L.04 OH 0.004
B BAHAN
1 Profil alluminium m
2 Alluminium strip m 14.600
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
B BAHAN
1 Batu bata Bh 70.000
2 Semen PC 50 kg Kg 14.370
3 Pasir Pasang m3 0.040
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
1 Batu bata Bh 140.000
2 Semen PC 50 kg Kg 14.370
3 Pasir Pasang m3 0.040
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.03 OH 0.150
3 Kepala Tukang L.03 OH 0.015
4 Mandor L.04 OH 0.015
B BAHAN
1 Semen PC 50 kg Kg 15.504
2 Pasir Pasang m3 0.016
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.120
2 Tukang Batu L.02 OH 0.120
3 Kepala Tukang L.03 OH 0.012
4 Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
1 Bataco bh 13.000
2 Semen PC 50 kg Kg 5.833
3 Pasir Pasang m3 0.013
JUMLAH HARGA BAHAN
C PERALATAN % 0.100
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.320
2 Tukang Batu L.02 OH 0.120
3 Kepala Tukang L.03 OH 0.012
4 Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
1 Bata Ringan 10 x 20 x 60 cm Bh 8.400
2 Perekat Bata Ringan ( Mortar MU - 380 ) zak 0.200
JUMLAH HARGA BAHAN
C PERALATAN % 0.100
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.130
2 Tukang Batu L.03 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
1 Plesteran Mortar ( MU - 200 ) Kg 9.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.130
2 Tukang Batu L.03 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
1 Acian Motar ( MU - 200 ) Kg 4.950
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang Batu L.03 OH 0.060
3 Kepala Tukang L.03 OH 0.006
4 Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Thinbed unt. acian Zak 0.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.080
2 Tukang Batu L.03 OH 0.040
3 Kepala Tukang L.03 OH 0.040
4 Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Semen PC 50 kg 0.5 0.500
Pasir Pasang 0.013 0.013
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.350
2 Tukang Batu L.02 OH 0.175
3 Kepala tukang L.03 OH 0.018
4 Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
1 Keramik Dinding 30 x 30 cm warna m2 1.050
2 Semen PC 50 kg Kg 10.000
3 Pasir Pasang M3 0.045
4 Semen warna pengisi nat Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.240
2 Tukang Batu L.02 OH 0.288
3 Kepala tukang L.03 OH 0.012
4 Mandor L.04 OH 0.012
JUMLAH TENAGA KERJA
B BAHAN
1 Keramik 20 x 20 cm warna m2 1.050
2 Semen PC 50 kg Kg 10.000
3 Pasir Pasang M3 0.045
4 Semen warna pengisi nat Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.240
2 Tukang Batu L.02 OH 0.120
3 Kepala tukang L.03 OH 0.012
4 Mandor L.04 OH 0.012
JUMLAH TENAGA KERJA
B BAHAN
1 Keramik 60 x 60 cm HT m2 1.050
2 Semen PC 50 kg kg 9.600
3 Semen warna pengisi nat Kg 1.100
4 Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.450
2 Tukang Batu L.02 OH 0.225
3 Kepala tukang L.03 OH 0.023
4 Mandor L.04 OH 0.023
B BAHAN
1 Keramik Dinding 20 x 25 KW 1 M2 1.050
2 Semen PC 50 kg Kg 9.300
3 Pasir Pasang M3 0.018
4 Semen warna pengisi nat Kg 0.500
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.090
2 Tukang Batu L.02 OH 0.045
3 Kepala tukang L.03 OH 0.005
4 Mandor L.04 OH 0.005
B BAHAN
1 Keramik 60 x 60 cm HT M2 0.167
2 Semen PC 50 kg Kg 1.140
3 Pasir Pasang M3 0.003
4 Semen warna pengisi nat Kg 0.025
C PERALATAN
1 Potong keramik Ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.115
2 Tukang Batu L.02 OH 0.010
3 Kepala tukang L.03 OH 0.020
4 Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
1 Step nozing 10x60 cm ( KW I ) M 1.667
2 Semen PC 50 kg Kg 1.040
3 Pasir Pasang M3 0.005
4 Semen warna pengisi nat Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
AHSP PEKERJAAN PLAFOND
Pemasangan 1 m2 langit-langit Gypsum ukuran (120x240x9) mm. tebal 9 mm
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang kayu L.02 OH 0.050
3 Kepala tukang L.03 OH 0.005
4 Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
1 Gypsumboard T= 9 mm Lembar 0.364
2 Paku segala ukuran kg 0.110
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.050
2 Tukang Kayu L.02 OH 0.050
3 Kepala tukang L.03 OH 0.005
4 Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
1 List profil gypsum t = 7 cm m 1.050
2 Paku segala ukuran kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang kayu L.02 OH 0.050
3 Kepala tukang L.03 OH 0.005
4 Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
1 Kalsiboard 6 mm Lembar 0.364
2 Paku segala ukuran kg 0.110
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.050
2 Tukang Kayu L.02 OH 0.050
3 Kepala tukang L.03 OH 0.005
4 Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
1 List profil gypsum t = 5 cm m 1.050
2 Paku segala ukuran kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.030
2 Tukang kayu L.02 OH 0.070
3 Kepala tukang L.03 OH 0.007
4 Mandor L.04 OH 0.004
B BAHAN
1 Asbes Plat 3 mm m2 1.100
2 Paku segala ukuran kg 0.010
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.200
2 Tukang Kayu L.03 OH 0.100
3 Kepala tukang L.11 OH 0.010
4 Mandor L.15 OH 0.001
B BAHAN
1 Genteng Metal T = 0,30 TCT m2 1.020
2 Paku segala ukuran Kg 0.200
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.150
2 Tukang Kayu L.03 OH 0.070
3 Kepala tukang L.11 OH 0.008
4 Mandor L.15 OH 0.006
B BAHAN
1 Nok Atas ( U ) T = 0,30 TCT m' 1.100
Self drilling screw dia 6 x 20 mm (truss Screw) bh 6.00
C PERALATAN
1 alat bantu ls 1.000
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang Kayu L.03 OH 0.150
Kepala tukang L.03 OH 0.080
Mandor L.04 OH 0.006
B BAHAN
Atap Spandek Berpasir t = 45 mm M2 1.050
Self drilling screw dia 6 x 20 mm (truss Screw) bh 9.00
Alat Bantu Ls 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15 % 15%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang L.03 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.008
B BAHAN
Alumunium Foil DS M2 1.050
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15 % 15%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.250
2 Tukang Kayu L.03 OH 0.150
3 Kepala tukang L.11 OH 0.015
4 Mandor L.15 OH 0.013
B BAHAN
1 Lisplank GRC Board uk. 2,4x,2x9mm m' 1.050
2 Paku segala ukuran Kg 0.050
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
AHSP PEKERJAAN KAYU
A TENAGA KERJA
1 Pekerja L.01 OH 0.010
2 Tukang kayu L.02 OH 0.500
3 Kepala tukang L.03 OH 0.050
4 Mandor L.04 OH 0.005
B BAHAN
1 Grendel Tanam Atas bh 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
1 Pekerja L.01 OH 0.010
2 Tukang kayu L.02 OH 0.500
3 Kepala tukang L.03 OH 0.050
4 Mandor L.04 OH 0.005
B BAHAN
1 Grendel Tanam Bawah bh 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
D-Cylinder
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang kayu L.02 OH 0.500
3 Kepala tukang L.03 OH 0.050
4 Mandor L.04 OH 0.005
B BAHAN
1 Pengunci D.Cylinder bh 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.015
2 Tukang kayu L.02 OH 0.150
3 Kepala tukang L.03 OH 0.015
4 Mandor L.04 OH 0.001
B BAHAN
1 Engsel Pintu 4" bh 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang kayu L.02 OH 0.100
3 Kepala tukang L.03 OH 0.010
4 Mandor L.04 OH 0.001
B BAHAN
1 Engsel Jendela 3" bh 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.015
2 Tukang kayu L.02 0.150
3 Kepala tukang L.03 0.015
4 Mandor L.04 OH 0.008
B BAHAN
1 Pengunci jendela (Spring Knip) Bh 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.015
2 Tukang kayu L.02 OH 0.150
3 Kepala tukang L.03 OH 0.015
4 Mandor L.04 OH 0.008
B BAHAN
1 Kait angin Bh 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.015
2 Tukang kayu L.02 OH 0.150
3 Kepala tukang L.03 OH 0.015
4 Mandor L.04 OH 0.001
B BAHAN
1 Kaca bening 5 mm m2 1.100
2 Sealant m' 1.100
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.025
2 Tukang kayu L.02 OH 0.250
3 Kepala tukang L.03 OH 0.025
4 Mandor L.04 OH 0.001
B BAHAN
1 Kaca bening 8 mm m2 1.100
2 Sealant m' 1.100
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
B BAHAN
Kaca cermin 5 mm m2 1.100
Frame kaca cermin 7 cm m' 4.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15 % 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.020
2 Tukang kayu L.02 OH 0.200
3 Kepala tukang L.03 OH 0.020
4 Mandor L.04 OH 0.020
B BAHAN
1 Handle pintu double Bh 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.020
2 Tukang kayu L.02 OH 0.200
3 Kepala tukang L.03 OH 0.020
4 Mandor L.04 OH 0.020
B BAHAN
1 Level Handle Single Bh 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
1 Pekerja L.01 OH 0.005
2 Tukang kayu L.02 OH 0.500
3 Kepala tukang L.03 OH 0.050
4 Mandor L.04 OH 0.003
B BAHAN
1 Lockcase set 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang kayu L.02 0.200
3 Kepala tukang L.03 0.020
4 Mandor L.04 OH 0.001
B BAHAN
1 Engsel friction stay 10" Bh 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.020
2 Tukang cat L.02 OH 0.063
3 Kepala tukang L.03 OH 0.006
4 Mandor L.04 OH 0.003
B BAHAN
1 Plamur tembok Kg 0.100
2 Cat dasar Kg 0.100
3 Cat tembok interior ex Catylac Kg 0.260
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.020
2 Tukang cat L.02 OH 0.200
3 Kepala tukang L.03 OH 0.020
4 Mandor L.04 OH 0.003
B BAHAN
1 cat Meni besi Kg 0.100
2 Kuas uk. 3" Bh 0.010
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
Pengecatan 1 m2 Plafond ( 1lapis plamuur. 1 lapis cat dasar. 2 lapis cat penutup)
A TENAGA
1 Pekerja L.01 OH 0.024
2 Tukang cat L.02 OH 0.076
3 Kepala tukang L.03 OH 0.008
4 Mandor L.04 OH 0.004
B BAHAN
1 Plamur tembok Kg 0.100
2 Cat dasar Kg 0.100
3 Cat tembok Dulux Weathershield Kg 0.143
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.10. Pengecatan 1 m2 tembok exterior ( 1lapis plamuur. 1 lapis cat dasar. 2 lapis cat penutup)
A TENAGA
1 Pekerja L.01 OH 0.030
2 Tukang cat L.02 OH 0.095
3 Kepala tukang L.03 OH 0.009
4 Mandor L.04 OH 0.005
B BAHAN
1 Plamur tembok Kg 0.100
2 Cat dasar Kg 0.100
3 Cat tembok Dulux Weathershield Kg 0.260
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
TENAGA
1 Pekerja L.01 OH 1.100
2 Tukang batu L.02 OH 0.367
3 Kepala tukang L.03 OH 0.003
4 Mandor L.04 OH 0.053
B BAHAN
1 Closed duduk ex toto type SW660J Unit 1.000
2 Perlengkapan Ls 6% x closet
3 Pasir Pasang M3 0.010
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A. Tenaga Kerja
1 Pekerja L.01 OH 0.010
2 Tukang batu L.02 OH 0.100
3 Kepala tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
B. Bahan
Jet Washer American Standar Unit 1.000
seal tape Bh 0.250
C. Peralatan
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
TENAGA
1 Pekerja L.01 OH 0.500
2 Tukang batu L.02 OH 0.750
3 Kepala tukang L.03 OH 0.080
4 Mandor L.04 OH 0.075
B BAHAN
1 Closet Jongkok "Lokal" Unit 1.000
2 Semen PC 50 kg Kg 6.000
3 Pasir Pasang M3 0.010
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 1.000
Kepala tukang L.03 OH 0.100
Mandor L.04 OH 0.050
B BAHAN
Urinoar Unit 1.000
Semen PC 50 kg Kg 6.000
Pasir Pasang M3 0.010
Perlengkapan % 30.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15 % 15%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.200
Tukang batu L.02 OH 1.450
Kepala tukang L.03 OH 0.150
Mandor L.04 OH 0.060
B BAHAN
wastafel + Kran Unit 1.200
Semen PC 50 kg Kg 6.000
Pasir Pasang M3 0.010
Perlengkapan % 12.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang batu L.02 OH 0.100
3 Kepala tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
B BAHAN
1 Kran wastafel Unit 1.000
2 Seal tape Bh 0.025
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 buah Grab Bar
A TENAGA
1 Pekerja L.01 OH 0.200
2 Tukang batu L.02 OH 0.100
3 Kepala tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
B BAHAN
1 Grab bar Unit 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang batu L.02 OH 0.100
3 Kepala tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
B BAHAN
1 Kran air Unit 1.000
2 seal tape Bh 0.025
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.030
2 Tukang batu L.02 OH 0.300
3 Kepala tukang L.03 OH 0.030
4 Mandor L.04 OH 0.015
B BAHAN
1 Zink Unit 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang batu L.02 OH 0.100
3 Kepala tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
B BAHAN
1 Kran Zink Unit 1.000
2 seal tape Bh 0.025
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang batu L.02 OH 0.100
3 Kepala tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
B BAHAN
1 Floor drain stainless "Lokal" Unit 1.000
2 Jasa Core Drill Dia 3" Unit 1.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang batu L.02 OH 0.100
3 Kepala tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
B BAHAN
1 Shower Unit 1.000
2 seal tape Bh 0.025
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.010
2 Tukang batu L.02 OH 0.100
3 Kepala tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
B BAHAN
1 Kran Shower Unit 1.000
2 Seal tape Bh 0.025
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
AHSP LAIN-LAIN
Water proofing (liquit/coating)
No Uraian Kode Satuan Koefisien
A TENAGA
1 Pekerja L.01 OH 0.200
2 Mandor L.02 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
1 Water proofing (liquit/coating) M2 1.000
2 Alat Bantu Ls 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.500
2 Mandor L.02 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
1 Water proofing (membrane) t= 3 mm Roll 1.200
2 Alat Bantu Ls 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.115
2 Tukang Batu L.02 OH 0.010
3 Kepala Tukang L.04 OH 0.075
4 Mandor L.05 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
1 Batu Kali 5/7 m³ 1.400
2 Semen PC 50 kg kg 202.000
3 Pasir Pasang m³ 0.485
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
EKERJAAN
/PRT/M/2016
RSIAPAN
109,126.15 10,912.62
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 773.37
25,094.27
2,656,984.62 31,883.82
22,774.15 455.48
3,306,427.57 23,144.99
55,484.29
80,578.56
x D 8,057.86
88,636.42
109,126.15 130,951.38
119,564.31 47,825.72
145,185.23 58,074.09
154,674.46 18,560.94
255,412.14
4,133,034.46 516,629.31
71,169.23 71,169.23
1,016,034.24 172,725.82
14,856.62 18,422.21
22,774.15 17,080.62
83,979.69 25,193.91
24,766.89 9,906.76
453,675.05 68,051.26
1,000,000.00 100,000.00
28,453.26 469,478.78
831,127.85
-
1,086,539.99
x D 108,654.00
1,195,193.99
109,126.15 109,126.15
119,564.31 239,128.62
145,185.23 29,037.05
154,674.46 7,733.72
385,025.54
4,133,034.46 289,312.41
22,774.15 6,832.25
1,328.49 11,956.43
246,720.00 7,401.60
208,763.08 10,438.15
61,680.00 92,520.00
49,344.00 12,336.00
430,796.84
-
815,822.38
x D 81,582.24
897,404.62
109,126.15 21,825.23
119,564.31 47,825.72
145,185.23 2,903.70
154,674.46 3,093.49
75,648.15
28,467.69 35,584.62
1,328.49 3,321.23
61,680.00 61,680.00
246,720.00 1,233.60
2,656,984.62 95,651.45
22,774.15 1,366.45
47,351.26 21,308.07
220,145.41
-
295,793.56
x D 29,579.36
325,372.91
TANAH
109,126.15 61,438.02
154,674.46 8,708.17
70,146.20
-
-
70,146.20
x D 7,014.62
77,160.82
109,126.15 73,660.15
154,674.46 10,440.53
84,100.68
250,000.00 16,750.00
250,000.00 16,750.00
33,500.00
117,600.68
x D 11,760.07
129,360.75
109,126.15 38,848.91
154,674.46 2,753.21
41,602.12
-
-
41,602.12
x D 4,160.21
45,762.33
109,126.15 36,011.63
154,674.46 5,104.26
41,115.89
-
41,115.89
x D 4,111.59
45,227.48
109,126.15 32,737.85
154,674.46 4,218.39
36,956.24
177,638.40 213,166.08
213,166.08
-
250,122.32
x D 25,012.23
275,134.55
ONDASI
109,126.15 163,689.23
119,564.31 89,673.23
145,185.23 10,888.89
154,674.46 11,600.58
275,851.94
442,198.15 530,637.78
1,328.49 268,355.45
246,720.00 119,659.20
918,652.43
-
1,194,504.37
x D 119,450.44
1,313,954.81
109,126.15 261,902.77
119,564.31 95,651.45
145,185.23 11,614.82
154,674.46 18,406.26
387,575.29
442,198.15 198,989.17
1,328.49 257,727.51
246,720.00 76,976.64
276,136.62 129,231.94
662,925.25
-
1,050,500.55
x D 105,050.05
1,155,550.60
BETON
109,126.15 163,689.23
119,564.31 32,880.18
145,185.23 3,194.08
154,674.46 12,837.98
212,601.47
66,424.62 328,137.60
246,720.00 153,142.63
276,136.62 153,255.82
200.00 30,000.00
664,536.05
877,137.52
x D 87,713.75
964,851.27
11,861.54 124,546.15
20,876.31 3,131.45
JUMLAH HARGA BAHAN 127,677.60
109,126.15 5,456.31
119,564.31 5,978.22
145,185.23 725.93
154,674.46 464.02
JUMLAH TENAGA KERJA 12,624.47
12,430.89 130,524.37
20,876.31 3,131.45
JUMLAH HARGA BAHAN 133,655.82
109,126.15 2,728.15
119,564.31 2,989.11
145,185.23 3,629.63
154,674.46 154.67
JUMLAH TENAGA KERJA 9,501.57
11,633.80 118,664.73
20,876.31 1,043.82
JUMLAH HARGA BAHAN 119,708.54
109,126.15 109,126.15
119,564.31 29,891.08
145,185.23 3,629.63
154,674.46 15,467.45
158,114.31
901,046.77 919,067.70
919,067.70
- -
-
1,077,182.01
x D 107,718.20
1,184,900.21
109,126.15 109,126.15
119,564.31 29,891.08
145,185.23 3,629.63
154,674.46 15,467.45
158,114.31
954,471.38 973,560.81
973,560.81
- -
-
1,131,675.12
x D 113,167.51
1,244,842.63
109,126.15 109,126.15
119,564.31 29,891.08
145,185.23 3,629.63
154,674.46 15,467.45
158,114.31
1,288,000.00 1,313,760.00
1,313,760.00
- -
-
1,471,874.31
x D 147,187.43
1,619,061.74
109,126.15 19,642.71
119,564.31 2,391.29
119,564.31 2,391.29
119,564.31 2,391.29
145,185.23 871.11
154,674.46 1,392.07
29,079.75
3,306,427.57 6,612.86
22,774.15 227.74
14,233.85 2,135.08
11,861.54 35,584.62
20,876.31 9,394.34
1,328.49 5,313.97
246,720.00 1,480.32
208,763.08 1,878.87
62,627.78
- -
JUMLAH HARGA ALAT -
91,707.53
x D 9,170.75
100,878.29
3,306,427.57 4,959.64
22,774.15 227.74
14,233.85 2,135.08
11,861.54 42,701.54
20,876.31 1,043.82
1,328.49 5,313.97
246,720.00 2,220.48
208,763.08 3,131.45
61,733.71
-
97,748.19
x D 9,774.82
107,523.01
109,126.15 19,097.08
119,564.31 20,923.75
145,185.23 2,540.74
154,674.46 1,392.07
JUMLAH TENAGA KERJA 43,953.64
1,328.49 1,660.62
246,720 128,787.84
276,136.62 238,029.76
JUMLAH HARGA BAHAN 368,478.22
109,126.15 6,547.57
119,564.31 7,173.86
145,185.23 725.93
154,674.46 1,469.41
JUMLAH TENAGA KERJA 15,916.76
10,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00
2,500 2,500.00
JUMLAH HARGA ALAT 2,500.00
68,416.76
xD 6,841.68
75,258.44
109,126.15 28,372.80
119,564.31 15,543.36
145,185.23 1,887.41
154,674.46 2,010.77
47,814.34
137,593.85 16,511.26
22,774.15 6,832.25
14,233.85 1,423.38
Jumlah pemakaian Bekisting 2x 24,766.89
-
72,581.23
x D 7,258.12
79,839.35
109,126.15 54,563.08
119,564.31 29,891.08
145,185.23 3,629.63
154,674.46 773.37
88,857.16
22,774.15 6,832.25
14,233.85 2,846.77
2,656,984.62 39,854.77
99,636.92 18,409.13
28,467.69 28,467.69
Jumlah pemakaian Bekisting 2x 96,410.61
-
185,267.77
x D 18,526.78
203,794.54
au 18 mm (tanpa perancah)
Harga Satuan (Rp) Jumlah Harga (Rp)
109,126.15 54,563.08
119,564.31 29,891.08
145,185.23 3,629.63
154,674.46 773.37
88,857.16
3,306,427.57 -
22,774.15 9,109.66
14,233.85 2,846.77
2,656,984.62 23,912.86
99,636.92 17,436.46
28,467.69 56,935.38
Jumlah pemakaian Bekisting 2x 110,241.14
-
199,098.30
x D 19,909.83
219,008.12
109,126.15 54,563.08
119,564.31 29,891.08
145,185.23 3,629.63
154,674.46 773.37
88,857.16
3,306,427.57 -
22,774.15 9,109.66
14,233.85 2,846.77
2,656,984.62 39,854.77
99,636.92 17,436.46
28,467.69 56,935.38
Jumlah pemakaian Bekisting 2x 126,183.05
-
215,040.20
x D 21,504.02
236,544.22
109,126.15 54,563.08
119,564.31 29,891.08
145,185.23 3,629.63
154,674.46 773.37
88,857.16
3,306,427.57 -
22,774.15 9,109.66
14,233.85 2,846.77
2,656,984.62 26,569.85
99,636.92 17,436.46
28,467.69 85,403.08
Jumlah pemakaian Bekisting 2x 141,365.82
-
230,222.97
x D 23,022.30
253,245.27
3,306,427.57 49,596.41
22,774.15 9,109.66
14,233.85 2,135.08
2,656,984.62 19,927.38
99,636.92 17,436.46
28,467.69 28,467.69
Jumlah pemakaian Bekisting 2x 126,672.69
-
187,360.12
x D 18,736.01
206,096.13
AN ALUMINIUM
0 x 60 cm, untuk plafon
109,126.15 19,097.08
119,564.31 20,923.75
145,185.23 2,540.74
154,674.46 1,392.07
JUMLAH TENAGA KERJA 43,953.64
16,005.17 64,020.68
-
JUMLAH HARGA BAHAN 64,020.68
109,126.15 6,547.57
119,564.31 7,173.86
145,185.23 871.11
154,674.46 464.02
15,056.56
14,233.85 16,368.92
16,368.92
-
31,425.49
x D 3,142.55
34,568.03
109,126.15 4,692.42
119,564.31 5,141.27
145,185.23 624.30
154,674.46 324.82
10,782.80
71,169.23 78,286.15
100.00 200.00
78,486.15
-
89,268.96
x D 8,926.90
98,195.85
109,126.15 4,692.42
119,564.31 5,141.27
145,185.23 624.30
154,674.46 324.82
10,782.80
78,950.40 86,845.44
86,845.44
-
97,628.24
x D 9,762.82
107,391.07
109,126.15 9,275.72
119,564.31 10,162.97
145,185.23 1,234.07
154,674.46 649.63
21,322.40
78,950.40 82,897.92
82,897.92
-
104,220.32
x D 10,422.03
114,642.35
109,126.15 9,275.72
119,564.31 10,162.97
145,185.23 1,234.07
154,674.46 649.63
21,322.40
71,169.23 -
10,000.00 146,000.00
146,000.00
167,322.40
x D 16,732.24
184,054.64
GAN DINDING
109,126.15 32,737.85
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 2,320.12
48,466.25
948.92 66,424.62
1,328.49 19,090.43
246,720.00 9,868.80
95,383.85
143,850.10
x D 14,385.01
158,235.11
109,126.15 32,737.85
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 2,320.12
48,466.25
948.92 132,849.23
1,328.49 19,090.43
246,720.00 9,868.80
161,808.47
-
210,274.71
x D 21,027.47
231,302.18
109,126.15 32,737.85
119,564.31 17,934.65
145,185.23 2,177.78
154,674.46 2,320.12
55,170.39
1,328.49 20,596.94
246,720.00 3,947.52
24,544.46
-
79,714.85
x D 7,971.49
87,686.34
109,126.15 13,095.14
119,564.31 14,347.72
145,185.23 1,742.22
154,674.46 371.22
JUMLAH TENAGA KERJA 29,556.30
3,036.55 39,475.20
1,328.49 7,749.10
246,720.00 3,281.38
JUMLAH HARGA BAHAN 47,224.30
4,722.43 4,722.43
JUMLAH HARGA ALAT 4,722.43
81,503.02
x D 8,150.30
89,653.32
11,978.22 100,617.01
3,795.69 759.14
JUMLAH HARGA BAHAN 101,376.15
10,137.61 10,137.61
JUMLAH HARGA ALAT 10,137.61
164,998.86
x D 16,499.89
181,498.75
ESTERAN
109,126.15 14,186.40
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 1,005.38
JUMLAH TENAGA KERJA 28,600.07
3,700.80 35,157.60
JUMLAH HARGA BAHAN 35,157.60
109,126.15 14,186.40
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 1,005.38
JUMLAH TENAGA KERJA 28,600.07
3,700.80 18,318.96
JUMLAH HARGA BAHAN 18,318.96
109,126.15 10,912.62
119,564.31 7,173.86
145,185.23 871.11
154,674.46 618.70
JUMLAH TENAGA KERJA 19,576.28
6,239.17 623.92
JUMLAH HARGA BAHAN 623.92
109,126.15 8,730.09
119,564.31 4,782.57
145,185.23 5,807.41
154,674.46 618.70
JUMLAH TENAGA KERJA 19,938.77
1,328.49 664.25
246,720.00 3,207.36
JUMLAH HARGA BAHAN 3,871.61
109,126.15 38,194.15
119,564.31 20,923.75
145,185.23 2,540.74
154,674.46 2,706.80
JUMLAH TENAGA KERJA 64,365.45
66,424.62 69,745.85
1,328.49 13,284.92
246,720.00 11,102.40
14,518.52 7,259.26
JUMLAH HARGA BAHAN 101,392.43
109,126.15 26,190.28
119,564.31 34,434.52
145,185.23 1,742.22
154,674.46 1,856.09
JUMLAH TENAGA KERJA 64,223.11
75,913.85 79,709.54
1,328.49 13,284.92
246,720.00 11,102.40
14,518.52 7,259.26
JUMLAH HARGA BAHAN 111,356.12
109,126.15 26,190.28
119,564.31 14,347.72
145,185.23 1,742.22
154,674.46 1,856.09
JUMLAH TENAGA KERJA 44,136.31
85,403.08 89,673.23
1,328.49 12,753.53
14,518.52 15,970.38
246,720.00 11,102.40
JUMLAH HARGA BAHAN 129,499.53
109,126.15 49,106.77
119,564.31 26,901.97
145,185.23 3,266.67
154,674.46 3,480.18
82,755.58
71,169.23 74,727.69
1,328.49 12,354.98
246,720.00 4,440.96
14,518.52 7,259.26
98,782.89
109,126.15 9,821.35
119,564.31 5,380.39
145,185.23 653.33
154,674.46 773.37
16,628.45
85,403.08 14,233.85
1,328.49 1,514.48
246,720.00 740.16
14,518.52 362.96
16,851.45
10,000.00 10,000.00
JUMLAH HARGA ALAT 10,000.00
43,479.90
xD 4,347.99
47,827.89
109,126.15 12,549.51
119,564.31 1,195.64
145,185.23 2,903.70
154,674.46 1,546.74
JUMLAH TENAGA KERJA 18,195.59
14,233.85 23,723.08
1,328.49 1,381.63
246,720.00 1,110.24
14,518.52 1,451.85
JUMLAH HARGA BAHAN 27,666.80
109,126.15 10,912.62
119,564.31 5,978.22
145,185.23 725.93
154,674.46 773.37
JUMLAH TENAGA KERJA 18,390.13
80,658.46 29,359.68
22,774.15 2,505.16
JUMLAH HARGA BAHAN 31,864.84
109,126.15 5,456.31
119,564.31 5,978.22
145,185.23 725.93
154,674.46 464.02
JUMLAH TENAGA KERJA 12,624.47
20,876.31 21,920.12
22,774.15 227.74
JUMLAH HARGA BAHAN 22,147.86
109,126.15 10,912.62
119,564.31 5,978.22
145,185.23 725.93
154,674.46 773.37
JUMLAH TENAGA KERJA 18,390.13
109,126.15 39,721.92
22,774.15 2,505.16
JUMLAH HARGA BAHAN 42,227.08
109,126.15 5,456.31
119,564.31 5,978.22
145,185.23 725.93
154,674.46 464.02
JUMLAH TENAGA KERJA 12,624.47
14,233.85 14,945.54
22,774.15 227.74
JUMLAH HARGA BAHAN 15,173.28
JUMLAH HARGA ALAT -
27,797.75
xD 2,779.78
30,577.53
dan 6 mm
109,126.15 3,273.78
119,564.31 8,369.50
145,185.23 1,016.30
154,674.46 618.70
13,278.28
- -
22,774.15 227.74
227.74
-
13,506.02
xD 1,350.60
14,856.62
UTUP ATAP
109,126.15 21,825.23
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 154.67
35,388.19
109,600.62 111,792.63
22,774.15 4,554.83
116,347.46
151,735.65
xD 15,173.56
166,909.21
109,126.15 16,368.92
119,564.31 8,369.50
145,185.23 1,161.48
154,674.46 928.05
26,827.95
59,212.80 65,134.08
400.00 2,400.00
67,534.08
5,921.28 5,921.28
5,921.28
100,283.31
xD 10,028.33
110,311.64
109,126.15 16,368.92
119,564.31 17,934.65
145,185.23 11,614.82
154,674.46 928.05
46,846.43
92,994.46 97,644.18
400.00 3,600.00
5,000.00 5,000.00
106,244.18
153,090.62
22,963.59
176,054.21
100,000.00 15,000.00
120,000.00 6,000.00
150,000.00 750.00
140,000.00 1,120.00
22,870.00
8,065.85 8,469.14
8,469.14
31,339.14
4,700.87
36,040.01
109,126.15 27,281.54
119,564.31 17,934.65
145,185.23 2,177.78
154,674.46 2,010.77
49,404.73
45,548.31 47,825.72
22,774.15 1,138.71
48,964.43
98,369.16
xD 9,836.92
108,206.08
KAYU
I DAN KACA
109,126.15 1,091.26
119,564.31 59,782.15
145,185.23 7,259.26
154,674.46 773.37
68,906.05
53,139.69 53,139.69
53,139.69
122,045.74
0.10 12,204.57
134,250.32
109,126.15 1,091.26
119,564.31 59,782.15
145,185.23 7,259.26
154,674.46 773.37
68,906.05
53,139.69 53,139.69
53,139.69
122,045.74
x D 12,204.57
134,250.32
109,126.15 1,091.26
119,564.31 59,782.15
145,185.23 7,259.26
154,674.46 773.37
68,906.05
134,747.08 134,747.08
134,747.08
203,653.13
x D 20,365.31
224,018.44
109,126.15 1,636.89
119,564.31 17,934.65
145,185.23 2,177.78
154,674.46 123.74
21,873.06
30,840.00 30,840.00
30,840.00
52,713.06
x D 5,271.31
57,984.36
109,126.15 1,091.26
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 77.34
14,576.88
20,449.29 20,449.29
20,449.29
35,026.17
x D 3,502.62
38,528.79
119,564.31 1,793.46
119,564.31 17,934.65
119,564.31 1,793.46
119,564.31 956.51
22,478.09
5,219.08 5,219.08
5,219.08
27,697.17
0.10 2,769.72
30,466.88
109,126.15 1,636.89
119,564.31 17,934.65
145,185.23 2,177.78
154,674.46 1,237.40
22,986.71
39,570.09 39,570.09
39,570.09
62,556.80
x D 6,255.68
68,812.49
113,870.77 125,257.85
5,722.01 6,294.21
131,552.05
153,425.11
x D 15,342.51
168,767.62
109,126.15 2,728.15
119,564.31 29,891.08
145,185.23 3,629.63
154,674.46 201.08
36,449.94
260,953.85 287,049.23
5,722.01 6,294.21
293,343.44
329,793.38
x D 32,979.34
362,772.71
115,000.00 1,725.00
126,000.00 18,900.00
153,000.00 2,295.00
163,000.00 1,304.00
24,224.00
88,249.85 97,074.83
37,956.92 151,827.69
248,902.52
273,126.52
27,312.65
300,439.18
109,126.15 2,182.52
119,564.31 23,912.86
145,185.23 2,903.70
154,674.46 3,093.49
32,092.58
189,784.62 189,784.62
189,784.62
221,877.19
xD 22,187.72
244,064.91
109,126.15 2,182.52
119,564.31 23,912.86
145,185.23 2,903.70
154,674.46 3,093.49
32,092.58
141,484.43 141,484.43
141,484.43
173,577.01
xD 17,357.70
190,934.71
109,126.15 545.63
119,564.31 59,782.15
145,185.23 7,259.26
154,674.46 464.02
68,051.07
142,338.46 142,338.46
142,338.46
210,389.53
xD 21,038.95
231,428.48
109,126.15 10,912.62
119,564.31 23,912.86
145,185.23 2,903.70
154,674.46 77.34
37,806.52
18,029.54 18,029.54
18,029.54
55,836.06
xD 5,583.61
61,419.66
GECATAN
s cat penutup)
109,126.15 2,182.52
119,564.31 7,532.55
145,185.23 914.67
154,674.46 464.02
11,093.76
59,592.37 5,959.24
29,416.62 2,941.66
22,584.37 5,871.94
14,772.83
25,866.60
xD 2,586.66
28,453.26
109,126.15 2,182.52
119,564.31 23,912.86
145,185.23 2,903.70
154,674.46 386.69
29,385.78
#N/A #N/A
#N/A #N/A
#N/A
#N/A
xD #N/A
#N/A
109,126.15 2,619.03
119,564.31 9,039.06
145,185.23 1,097.60
154,674.46 556.83
13,312.52
59,592.37 5,959.24
29,416.62 2,941.66
58,453.66 8,350.52
17,251.42
30,563.94
xD 3,056.39
33,620.33
109,126.15 3,273.78
119,564.31 11,298.83
145,185.23 1,372.00
154,674.46 696.04
16,640.65
59,592.37 5,959.24
29,416.62 2,941.66
58,453.66 15,197.95
24,098.85
40,739.50
xD 4,073.95
44,813.45
ASI GEDUNG
109,126.15 120,038.77
119,564.31 43,840.25
145,185.23 483.95
154,674.46 8,249.30
172,612.27
2,577,275.08 2,577,275.08
154,636.50 154,636.50
246,720.00 2,467.20
2,734,378.78
2,906,991.05
xD 290,699.11
3,197,690.16
135,500.00 1,355.00
155,800.00 15,580.00
170,500.00 1,705.00
183,000.00 915.00
19,555.00
166,061.54 166,061.54
2,372.31 593.08
166,654.62
167,569.62
xD 16,756.96
184,326.58
109,126.15 54,563.08
119,564.31 89,673.23
145,185.23 11,614.82
154,674.46 11,600.58
167,451.71
379,569.23 379,569.23
1,328.49 7,970.95
246,720.00 2,467.20
390,007.38
557,459.10
xD 55,745.91
613,205.00
109,126.15 109,126.15
119,564.31 119,564.31
145,185.23 14,518.52
154,674.46 7,733.72
250,942.71
2,177,247.06 2,177,247.06
66,424.62 398,547.69
246,720.00 2,467.20
653,174.12 653,174.12
3,231,436.08
3,482,378.78
522,356.82
4,004,735.60
1,138,707.69 1,366,449.23
66,424.62 398,547.69
246,720.00 2,467.20
163,973.91 163,973.91
1,931,438.03
2,266,815.91
0.10 226,681.59
2,493,497.51
109,126.15 1,091.26
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 773.37
15,272.92
160,026.39 160,026.39
2,372.31 59.31
160,085.70
175,358.61
xD 17,535.86
192,894.47
Harga Satuan (Rp) Jumlah Harga (Rp)
109,126.15 21,825.23
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 773.37
36,006.89
403,785.75 403,785.75
403,785.75
439,792.63
xD 43,979.26
483,771.90
109,126.15 1,091.26
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 773.37
15,272.92
142,338.46 142,338.46
2,372.31 59.31
142,397.77
157,670.69
xD 15,767.07
173,437.75
109,126.15 3,273.78
119,564.31 35,869.29
145,185.23 4,355.56
154,674.46 2,320.12
45,818.75
218,252.31 218,252.31
218,252.31
264,071.06
xD 26,407.11
290,478.16
109,126.15 1,091.26
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 773.37
15,272.92
265,698.46 265,698.46
2,372.31 59.31
265,757.77
281,030.69
xD 28,103.07
309,133.75
109,126.15 1,091.26
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 773.37
15,272.92
71,169.23 71,169.23
227,741.54 227,741.54
298,910.77
314,183.69
xD 31,418.37
345,602.05
109,126.15 1,091.26
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 773.37
15,272.92
337,816.62 337,816.62
5,500.00 137.50
337,954.12
353,227.03
xD 35,322.70
388,549.74
109,126.15 1,091.26
119,564.31 11,956.43
145,185.23 1,451.85
154,674.46 773.37
15,272.92
368,163.18 368,163.18
2,372.31 59.31
368,222.48
383,495.40
xD 38,349.54
421,844.94
N PIPA
AN PIPA
N PIPA
N
Harga Satuan (Rp) Jumlah Harga (Rp)
109,126.15 21,825.23
154,674.46 3,093.49
JUMLAH TENAGA KERJA 24,918.72
60,098.46 60,098.46
5,000.00 5,000.00
JUMLAH HARGA BAHAN 65,098.46
109,126.15 54,563.08
154,674.46 773.37
JUMLAH TENAGA KERJA 55,336.45
104,381.54 125,257.85
5,000.00 5,000.00
JUMLAH HARGA BAHAN 130,257.85
109,126.15 12,549.51
119,564.31 1,195.64
145,185.23 10,888.89
154,674.46 11,600.58
JUMLAH TENAGA KERJA 36,234.62
442,198.15 619,077.42
1,328.49 268,355.45
246,720.00 119,659.20
JUMLAH HARGA BAHAN 887,432.87
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang cat L.02 OH 0.600
3 Kepala tukang L.03 OH 0.060
4 Mandor L.04 OH 0.060
B BAHAN
1 Rangka Hollow 30.30 m 7.160
2 Rangka Hollow 50.50 m 1.800
3 stainless steel flat bar m 0.250
4 Fitting lapis karet kg 2.000
Baut angker ls 8.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
PEKERJAAN HANDRAILL
A TENAGA
1 Pekerja L.01 OH 0.400
2 Tukang cat L.02 OH 0.400
3 Kepala tukang L.03 OH 0.040
4 Mandor L.04 OH 0.040
B BAHAN
1 Pipa Galvanis 3" m 1.050
2 stainless steel flat bar m 0.250
3 Fitting lapis karet kg 1.700
4 Baut angker ls 4.000
C PERALATAN
Las Listrik jam 0.170
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.300
Kepala Tukang L.03 OH 0.030
Mandor L.04 OH 0.001
B BAHAN
Paving Block t=8 cm Bh 36.000
Pasir Urug t=5 cm m3 0.061
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.090
2 Tukang Batu L.03 OH 0.010
3 Tukang Kayu L.03 OH 0.010
4 Tukang Besi L.03 OH 0.010
5 Kepala Tukang L.03 OH 0.003
6 Mandor L.04 OH 0.005
B BAHAN
1 Kayu Papan Kelas III m3 0.001
2 Paku segala ukuran Kg 0.010
3 Minyak bekisting Ltr 0.150
4 Baja Tulangan U-24 (besi beton biasa) Polos Kg 3.000
5 Kawat Beton / Bendrat Kg 0.450
6 Semen PC 50 kg Kg 4.000
7 Pasir Cor / Beton m3 0.006
8 Koral Beton 2/3 m3 0.009
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang cat L.02 OH 0.300
3 Kepala tukang L.03 OH 0.060
4 Mandor L.04 OH 0.060
B BAHAN
1 kawat las kg 0.100
2 Cat kayu / besi kg 0.260
3 GRC 120.240. x 4 mm m2 1.100
4 Cat Exsterior m2 1.100
C PERALATAN
Las Listrik jam 0.170
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)
Pas. Logo PU Plat Baja 80 x 80 t=3mm finish cat duco warna doff terpasang
A TENAGA
1 Pekerja L.01 OH 3.000
2 Tukang Las L.02 OH 4.000
3 Tukang Cat L.02 OH 1.500
4 Kepala Tukang L.03 OH 1.100
5 Mandor L.04 OH 1.100
B BAHAN
1 Baja Plat kg 43.710
2 Kawat las kg 0.590
3 Cat kayu / besi kg 0.900
4 Baut angker bh 4.000
5 Material Bantu (amplas, dempul, las, dll) ls 1.000
C PERALATAN
6 Alat Bantu pasang di atas bangunan ls 1.000
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
1 Pekerja L.01 OH 0.300
2 Tukang Batu L.02 OH 0.300
3 Kepala Tukang L.03 OH 0.100
4 Mandor L.04 OH 0.015
B BAHAN
1 Plat Strip 3 x 30 x 6 M Bh 0.667
2 Besi Siku 40.40.4 M 2.000
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.035
Tukang Batu L.02 OH 0.007
Mandor L.04 OH 0.079
AIN-LAIN
109,126.15 65,475.69
119,564.31 71,738.58
145,185.23 8,711.11
154,674.46 9,280.47
155,205.86
15,926.09 114,030.82
35,062.71 63,112.87
148,895.52 37,223.88
33,720.46 67,440.91
14,233.85 113,870.77
281,808.49
-
437,014.35
x D 43,701.43
480,715.78
109,126.15 43,650.46
119,564.31 47,825.72
145,185.23 5,807.41
154,674.46 6,186.98
103,470.57
69,556.06 73,033.86
148,895.52 37,223.88
33,720.46 57,324.78
14,233.85 56,935.38
73,033.86
70,100.00 11,917.00
11,917.00
188,421.44
x D 18,842.14
207,263.58
109,126.15 32,737.85
119,564.31 35,869.29
145,185.23 4,355.56
154,674.46 154.67
73,117.37
1,802.95 64,906.34
115,000.00 6,957.50
71,863.84
144,981.21
0.10 14,498.12
159,479.33
115,000.00 10,350.00
126,000.00 1,260.00
126,000.00 1,260.00
126,000.00 1,260.00
153,000.00 459.00
163,000.00 733.50
15,322.50
3,306,427.57 3,306.43
22,774.15 227.74
14,233.85 2,135.08
11,861.54 35,584.62
20,876.31 9,394.34
1,328.49 5,313.97
246,720.00 1,480.32
208,763.08 1,878.87
59,321.36
- -
JUMLAH HARGA ALAT -
74,643.86
x D 7,464.39
82,108.24
109,126.15 65,475.69
119,564.31 35,869.29
145,185.23 8,711.11
154,674.46 9,280.47
119,336.57
19,927.38 1,992.74
67,088.86 17,443.10
66,424.62 73,067.08
44,813.45 49,294.79
141,797.71
62,657.39 10,651.76
10,651.76
271,786.03
x D 27,178.60
298,964.64
109,126.15 327,378.46
119,564.31 478,257.23
119,564.31 179,346.46
145,185.23 159,703.75
154,674.46 170,141.91
1,314,827.82
14,233.85 622,161.42
19,927.38 11,759.75
67,088.86 60,379.98
14,233.85 56,935.38
150,000.00 150,000.00
901,236.52
400,000.00 400,000.00
400,000.00
2,616,064.34
x D 261,606.43
2,877,670.77
109,126.15 32,737.85
119,564.31 35,869.29
145,185.23 14,518.52
154,674.46 2,320.12
85,445.78
96,410.58 64,273.72
18,187.69 36,375.38
100,649.11
-
186,094.89
x D 18,609.49
204,704.37
109,126.15 3,783.04
119,564.31 797.10
154,674.46 12,270.84
16,850.98
42,701.54 42,701.54
42,701.54
5,000.00 5,000.00
5,000.00
64,552.51
x D 6,455.25
71,007.77
Pondasi Bore Pile ø 400 mm, panjang +/- 5m
A TENAGA
1 Pekerja L.01 OH 1.000
2 Alat Cor Beton pakai pompa lengkap pipa, slang dan Cra m3 2.137
A TENAGA
1 Pekerja L.01 OH 7.500
109,126.15 109,126.15
119,564.31 59,782.15
154,674.46 7,733.72
176,642.03
110,724.25 1,882,312.31
75,000.00 160,285.71
830,557.26 104,412.91
45,762.33 97,800.63
1,619,061.74 3,460,166.23
16,090.83 3,258,845.72
240.00 48,606.75
9,012,430.27
5,000,000.00 5,000,000.00
5,000,000.00
14,189,072.30
834,651.31
x D 83,465.13
918,116.44
109,126.15 818,446.15
119,564.31 448,366.15
1,266,812.31
15000 150,000.00
150,000.00
300,000.00 225,000.00
260,000.00 195,000.00
45,500.00 45,500.00
465,500.00
1,882,312.31
Pembongkaran 1 m3 beton bertulang
A TENAGA
1 Pekerja L.01 OH 6.667
A TENAGA
1 Pekerja L.01 OH 0.200
A TENAGA
1 Pekerja L.01 OH 0.010
Lapis pondasi makadam levelling, tebal rata-rata 20 cm, termasuk pemadatan dengan mesin gilas
A TENAGA
1 Pekerja L.01 OH 0.250
A TENAGA
1 Pekerja L.01 Jam 0.030
Laston Lapis Aus (AC-BC).t= 5 cm, dengan aditif Anti Strpping Agent
A TENAGA
1 Pekerja L.01 OH 0.500
Laston Lapis Aus (AC-WC).t= 5 cm, dengan aditif Anti Strpping Agent
A TENAGA
1 Pekerja L.01 OH 0.500
109,126.15 727,544.07
154,674.46 103,013.19
830,557.26
-
830,557.26
109,126.15 21,825.23
154,674.46 3,093.49
24,918.72
85,403.08 85,403.08
85,403.08
5,000.00 5,000.00
5,000.00
115,321.80
1,864.63
695,000.00 10,425.00
1,000.00 1,000.00
11,425.00
13,289.63
x D 1,328.96
14,618.60
109,126.15 27,281.54
154,674.46 7,733.72
35,015.26
199,273.85 239,128.62
239,128.62
695,000.00 10,425.00
1,000.00 1,000.00
11,425.00
285,568.88
x D 28,556.89
314,125.76
15,589.45 467.68
22,096.35 132.58
600.26
11,000.00 10,696.40
5,219.08 1,842.33
12,538.73
40,000.00 200.00
103,000.00 618.00
71,000.00 355.00
818.00
13,957.00
x D 1,395.70
15,352.70
109,126.15 54,563.08
154,674.46 7,733.72
62,296.80
1,505,940.92 1,505,940.92
90,147.69 45,073.85
1,551,014.77
695,000.00 139,000.00
1,000.00 1,000.00
140,000.00
1,753,311.57
x D 175,331.16
1,928,642.73
266,152.70
109,126.15 54,563.08
154,674.46 7,733.72
62,296.80
1,571,416.62 1,571,416.62
90,147.69 45,073.85
1,616,490.46
695,000.00 139,000.00
1,000.00 1,000.00
140,000.00
1,818,787.26
x D 181,878.73
2,000,665.99
184,061.27
REKAPITULASI ANALISA PEKERJAAN KONSTRUKSI
PEKERJAAN TANAH
1 Penggalian tanah biasa sedalam 1 m 1.00 M3
2 Penggalian tanah biasa sedalam 2 m 1.00 M3
3 Pembuangan tanah sejauh 30 m 1.00 M2
4 Pengurugan Kembali dengan tanah 1.00 M3
5 Urugan dengan pasir urug 1.00 M3
PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15mm (Trasram) 1.00 M²
2 Pemasangan 1 m2 acian. 1.00 M²
3 Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP) 1.00 M²
4 Pemasangan 1 m2 plesteran acian mortar siap pakai (MSP) 1.00 M²
5 Perapihan Kolom / Balok Beton 1.00 M²
6 Pemasangan 1 m' Benangan / Tali air 1.00 M1
PEKERJAAN PLAFOND
1 Pemasangan langit-langit gypsum board tebal 9 mm 1.00 M²
2 Pemasangan list langit-langit gypsum t = 7 cm 1.00 M1
3 Pekerjaan kalsiboard 6 mm 1.00 M²
4 Pemasangan list langit-langit kalsiboard profil t = 5 cm 1.00 M1
PEKERJAAN PENGECATAN
1 Cat dinding bag. Dalam (interior) Tipe Acrilic emultion paint 1.00 M²
2 Cat dinding bag. Luar (exterior) Tipe Wheatershield 1.00 M²
4 Cat Plafond Tipe Acrilic emultion paint 1.00 M²
DIVISI JENIS PEKERJAAN SATUANKUANTITAS
LAIN-LAIN
1 Pek. Handrail dengan pipa galvanis 3" finish cat 1.00 M'
2 Pek. Pas. Railling Ramp dengan hollow galvanis 1.00 M'
3 Pasang 1 m2 Paving block t=8 cm 1.00 M²
4 Beton Jepit Ukuran 10 x 15 cm 1.00 M'
5 Pekerjaan Pondasi Tiang Pancang 30 x 30, L = 15 m 1.00 M'
6 Pemotongan kepala tiang termasuk buang puing pancang 1.00 ttk
7 Pek. Pas ornamen GRC Fin. Cat weathershild 1.00 M²
8 Pas. Logo PU Plat Baja 80 x 80 t=3mm finish cat duco warna doff terpasang 1.00 Bh
9 Grill penutup saluran, besi siku 50.50.5 + plat strip 1.00 M
10 Kusen Hollow Galvalum + Daun Pintu Plat besi (terpasang lengkap dengan aks 1.00 Unit
11 Kisi-kisi 1.00 Unit
12 Pancang Kayu Cerucuk Ø 10 - 12 cm 1.00 ttk
13 Pondasi Bore Pile ø 400 mm, panjang +/- 5m 1.00 M'
14 Pengadaan dan pemasangan saluran Buis Beton Ø 30 cm 1.00 M'
15 Pemadatan tanah dasar dengan Mesin Gilas 1.00 M²
16 Lapis pondasi makadam levelling, tebal rata-rata 20 cm, termasuk pemadatan 1.00 M3
17 Lapis Perekat/Tack Coat Emulsi 1.00 M²
18 Laston Lapis Aus (AC-BC).t= 5 cm, dengan aditif Anti Strpping Agent 1.00 M²
19 Laston Lapis Aus (AC-WC).t= 4 cm, dengan aditif Anti Strpping Agent 1.00 M²
HARGA
SATUAN
(Rp)
AN ARSITEKTUR DAN STRUKTUR
325,372.91
88,636.42
1,195,193.99
897,404.62
77,160.82
129,360.75
45,762.33
45,227.48
275,134.55
1,313,954.81
1,155,550.60
964,851.27
16,090.83
15,433.23
1,184,900.21
1,244,842.63
203,794.54
219,008.12
236,544.22
253,245.27
206,096.13
100,878.29
107,523.01
34,568.03
98,195.85
118,771.75
114,642.35
107,391.07
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
HARGA
SATUAN
(Rp)
231,302.18
158,235.11
89,653.32
181,498.75
87,686.34
51,610.93
70,133.43
51,610.93
22,220.22
26,191.42
182,333.67
193,137.16
199,692.32
190,999.43
47,827.89
50,448.63
55,280.46
38,249.57
66,678.93
30,577.53
166,909.21
110,311.64
176,054.21
197,926.23
99,018.90
204,153.73
108,206.08
134,250.32
134,250.32
224,018.44
57,984.36
38,528.79
30,466.88
68,812.49
168,767.62
362,772.71
300,439.18
231,428.48
244,064.91
190,934.71
61,419.66
184,054.64
28,453.26
44,813.45
33,620.33
HARGA
SATUAN
(Rp)
3,197,690.16
184,326.58
613,205.00
4,004,735.60
2,493,497.51
483,771.90
388,549.74
421,844.94
173,437.75
290,478.16
309,133.75
345,602.05
388,549.74
207,263.58
480,715.78
159,479.33
82,108.24
364,634.26
87,679.97
298,964.64
2,877,670.77
204,704.37
#REF!
#REF!
71,007.77
918,116.44
115,321.80
14,618.60
314,125.76
15,352.70
266,152.70
184,061.27
HARGA SATUAN MATERIAL
II. BAHAN
A. BAHAN PASIR
1 Pasir Urug / Tanah katel. M3
2 Pasir Pasang M3
3 Pasir Cor / Beton M3
4 Tanah Urug M3
5 Sirtu M3
B. BAHAN BATU
1 Koral Beton 2/3 M3
2 Batu bata Bh
3 Bataco Bh
4 Bata Ringan 10 x 20 x 60 cm Bh
5 Batu Kali 5/7 m3
6 Kerikil 2/3 m3
7 Roster 20 x 40 bh
8 Roster 20 x 20 bh
9 makadam m3
C. BAHAN SEMEN, BETON
1 Semen PC 50 kg zak
2 Semen warna pengisi nat 1Kg
3 Semen Thinbed unt. acian zak
4 Semen Skimcoat
5 Perekat Bata Ringan ( Mortar MU - 380 ) zak
6 Plesteran Mortar ( MU - 200 ) kg
7 Acian Motar ( MU - 200 ) kg
8 Air Ltr
9 Beton Ready Mixed K-275 M3
10 Beton Ready Mixed K-300 M3
11 Tiang Pancang Beton dia.30 cm m'
D. BAHAN LANTAI
1 Keramik 20 x 20 cm warna M2
2 Keramik 60 x 60 cm HT M2
3 Keramik Dinding 30 x 30 cm warna M2
4 Keramik Dinding 20 x 25 KW 1 M2
5 Step nozing 10x60 cm ( KW I ) pcs
6 Plint HT (10 x 60 cm) pcs
E. BAHAN KAYU
1 Keyu meranti usuk 5/7 M3
2 Kayu meranti papan 3/25/400 M3
3 Kayu Papan Kelas III m3
4 Dolken kayu klas III 7 - 10 cm, pjg 3 m btg
5 Dolken kayu klas III 10 - 12 cm, pjg 3 m btg
6 Kayu Balok klas 3 m3
7 Kayu Papan bekisting kelas 3 m3
8 Triplek Tebal 4mm lbr
9 Triplek Tebal 9mm lbr
10 Triplek Tebal 12mm lbr
11 Triplek Tebal 18mm lbr
G. BAHAN BESI
1 Aluminium 3" M1
2 Sealant M1
3 Paku segala ukuran Kg
4 kawat las Kg
5 Baja Tulangan U-39 Ulir kg
6 Baja Tulangan U-24 (besi beton biasa) Polos kg
7 Baja Profil kg
8 Kawat Beton / Bendrat kg
9 Paku Baiasa 4 cm - 7 cm kg
10 Baja Wiremesh untuk pelat lantai beton kg
11 Alumunium frame Pintu 3" Coklat/Hitam m'
12 Alumunium frame Jendela 3" Coklat/Hitam m'
13 Paku Payung kg
14 Pipa Galvanis 3" Btg
15 Paku Gypsum Btg
16 Plat Strip 5 x 50 x 6 M Btg
17 Plat Strip 3 x 30 x 6 M Btg
18 Main truss C-75-75 Bt
19 Roof Bottom/Reng R 33-0.45 Bt
20 Self drilling screw dia 6 x 20 mm (truss Screw) bh
21 Dynabol dia 12 x 120 mm bh
22 Baja Plat Kg
23 Besi Siku 40.40.4 Btg
I. BAHAN PENGECATAN
1 Plamur tembok Kg
2 Cat kayu / besi Kg
3 Cat tembok Dulux Weathershield Kg
4 Cat tembok interior ex Catylac Kg
5 Cat meni Kg
6 Cat dasar Kg
J. BAHAN KACA
1 Kaca bening 5 mm m2
2 Kaca bening 8 mm m2
3 Kaca cermin 5 mm m2
4 Kaca cermin 8 mm m2
K. BAHAN ASSESORIES PINTU JENDELA
1 Casement- 08" Psg
2 Pengunci jendela (Spring Knip) Psg
3 Handle pintu double Bh
4 Level Handle Single Bh
5 Lockcase Set
6 Lockcase Pelor pintu double Set
7 Hinges Psg
8 Pengunci D.Cylinder Set
9 Grendel Tanam Bawah Bh
10 Grendel Tanam Atas Bh
11 Karet List kaca m'
12 Engsel Jendela 3" set
13 Engsel Pintu 4" set
14 Engsel friction stay 10" Pasang
15 Kait angin bh
L. BAHAN SANITAIR
1 Shower bh
2 Kran Shower Bh
3 Floor drain stainless "Lokal" Bh
4 Closet Jongkok "Lokal" Bh
5 Closed duduk ex toto type SW660J Bh
6 Kran air Bh
7 Roof drain Cast Irion bh
8 Pipa PVC 1/2" Bt
9 Pipa PVC 3/4" Bt
10 Pipa PVC AW 1" Bt
11 Pipa PVC AW 2" Bt
12 Pipa PVC AW 3" Bt
13 Pipa PVC AW 4" Bt
14 Pipa PVC AW 6" Bt
15 Seal tape bh
16 Urinoar bh
17 wastafel + Kran bh
18 Kran Wastafel bh
19 Grab Bar bh
20 Zink bh
21 Kran Zink bh
22 Jet Washer American Standar bh
bh
M. BAHAN WATERPROOFING
1 Water proofing (membrane) t= 3 mm m2
2 Water proofing (liquit/coating) Kg
N. BAHAN LAIN - LAIN
1 Glass block 20 x 20 mm bh
2 Paving Block t=8 cm bh
3 Rangka Metal Furring 40.40.1,2 btg
4 Rangka Metal Furring 40.20.1,2 btg
5 Rangka Hollow 30.30 btg
6 Rangka Hollow 50.50 btg
7 Welding Set jam
8 Daun Pintu Plat baja m2
9 Stainless steel flat bar m
10 Baut angker bh
11 Fitting Lapis Karet kg
12 Pompa dan conveyor beton sewa-hari
13 Minyak Bekisting L
14 Alumunium Foil DS M2
15 Baja ringan C 75.75 btg
16 Reng Baja ringan btg
17 Daun Pintu Engineering wood Unit
18 Buis Beton dia 30 cm m
19 Frame kaca cermin 7 cm m
20 Jasa Core Drill Dia 3" Unit
21 Asphalt Hot Mix AC-BC Ton
22 Asphalt Hot Mix AC-WC Ton
23 Adhesion promoter untuk hotmix (Anti Stripping Agent) kg
Kerosen kg
Ekscavator Jam
Dump Truck Jam
Baby Roller Jam
Genset Jam
HARGA (Rp)
109,126.15
145,185.23
119,564.31
145,185.23
119,564.31
145,185.23
119,564.31
145,185.23
119,564.31
154,674.46
119,564.31
119,564.31
119,564.31
119,564.31
145,185.23
177,638.40
246,720.00
246,720.00
113,870.77
158,470.15
208,763.08
948.92
3,036.55
11,978.22
442,198.15
276,136.62
23,699.35
12,810.46
199,273.85
66,424.62
14,518.52
6,239.17
6,239.17
3,795.69
3,700.80
3,700.80
47.45
901,046.77
954,471.38
306,209.23
75,913.85
85,403.08
66,424.62
71,169.23
14,233.85
10,438.15
4,133,034.46
4,133,034.46
3,306,427.57
28,467.69
42,701.54
2,656,984.62
3,226,338.46
71,169.23
99,636.92
137,593.85
214,456.62
66,424.62
806,584.62
45,548.31
80,658.46
20,876.31
14,233.85
109,126.15
174,127.38
71,169.23
5,722.01
22,774.15
19,927.38
12,430.89
11,861.54
14,233.85
20,876.31
14,898.09
11,633.80
78,950.40
103,622.40
24,766.89
69,556.06
21,825.23
120,513.23
96,410.58
80,658.46
39,854.77
130.00
9,489.23
14,233.85
109,126.15
92,994.46
109,600.62
59,212.80
61,680.00
83,979.69
59,592.37
67,088.86
58,453.66
22,584.37
47,351.26
29,416.62
113,870.77
260,953.85
88,249.85
129,053.54
65,689.20
5,219.08
189,784.62
141,484.43
142,338.46
181,908.55
12,127.24
134,747.08
53,139.69
53,139.69
4,744.62
40,898.58
61,680.00
18,029.54
39,570.09
337,816.62
368,163.18
71,169.23
379,569.23
2,577,275.08
142,338.46
184,091.08
29,891.08
37,102.89
41,088.37
90,337.48
185,609.35
307,545.97
683,414.40
2,372.31
2,177,247.06
1,138,707.69
160,026.39
403,785.75
218,252.31
265,698.46
166,061.54
104,381.54
60,098.46
23,723.08
1,802.95
96,031.02
72,687.51
95,556.55
210,376.25
62,657.39
867,790.15
148,895.52
14,233.85
33,720.46
14,233.85
8,065.85
113,870.77
56,935.38
1,518,276.92
85,403.08
37,956.92
227,741.54
1,505,940.92
1,571,416.62
90,147.69
5,219.08
250,000.00
250,000.00
200,000.00
75,000.00
HARGA SATUAN MATERIAL
II. BAHAN
A. BAHAN PASIR
1 Pasir Urug / Tanah katel. M3
2 Pasir Pasang M3
3 Pasir Cor / Beton M3
4 Tanah Urug M3
B. BAHAN BATU
1 Koral Beton 2/3 M3
2 Batu bata Bh
3 Bataco Bh
4 Bata Ringan 7,5 x 20 x 60 cm Bh
5 Batu Kali 5/7 m3
6 Kerikil 2/3 m3
7 Roster 20 x 40
8 Roster 20 x 20
D. BAHAN LANTAI
1 Keramik 20 x 20 cm warna M2
2 Keramik 60 x 60 cm HT M2
3 Keramik Dinding 30 x 30 cm warna M2
4 Keramik Dinding 20 x 25 KW 1 M2
5 Step nozing 10x60 cm ( KW I ) pcs
6 Plint HT (10 x 60 cm) pcs
E. BAHAN KAYU
1 Keyu meranti usuk 5/7 M3
2 Kayu meranti papan 3/25/400 M3
3 Kayu Papan Kelas III m3
4 Dolken kayu klas III 7 - 10 cm, pjg 3 m btg
5 Dolken kayu klas III 10 - 12 cm, pjg 3 m btg
6 Kayu Balok klas 3 m3
7 Kayu Papan bekisting kelas 3 m3
8 Triplek Tebal 4mm lbr
9 Triplek Tebal 9mm lbr
10 Triplek Tebal 12mm lbr
11 Triplek Tebal 18mm lbr
G. BAHAN BESI
1 Aluminium 3" M1
2 Sealant M1
3 Paku segala ukuran Kg
4 kawat las Kg
5 Baja Tulangan U-39 Ulir kg
6 Baja Tulangan U-24 (besi beton biasa) Polos kg
7 Baja Profil kg
8 Kawat Beton / Bendrat kg
9 Paku Baiasa 4 cm - 7 cm kg
10 Baja Wiremesh untuk pelat lantai beton kg
11 Alumunium frame Pintu 3" Coklat/Hitam m'
12 Alumunium frame Jendela 3" Coklat/Hitam m'
13 Paku Payung kg
14 Pipa Galvanis 3" Btg
15 Paku Gypsum Kg
16 Plat Strip 5 x 50 x 6 M Btg
17 Plat Strip 3 x 30 x 6 M Btg
18 Main truss C-75-75 Bt
19 Roof Bottom/Reng R 33-0.45 Bt
20 Self drilling screw dia 6 x 20 mm (truss Screw) bh
21 Dynabol dia 12 x 120 mm bh
22 Baja Plat Kg
23 Besi Siku 40.40.4 Btg
I. BAHAN PENGECATAN
1 Plamur tembok Kg
2 Cat kayu / besi Kg
3 Cat tembok Dulux Weathershield Kg
4 Cat tembok interior ex Catylac Kg
5 Cat meni Kg
6 Cat dasar Kg
J. BAHAN KACA
1 Kaca bening 5 mm m2
2 Kaca bening 8 mm m2
3 Kaca cermin 5 mm m2
4 Kaca cermin 8 mm m2
L. BAHAN SANITAIR
1 Shower bh
2 Kran Shower Bh
3 Floor drain stainless "Lokal" Bh
4 Closet Jongkok "Lokal" Bh
5 Closed duduk ex toto type SW660J Bh
6 Kran air Bh
7 Roof drain Cast Irion bh
8 Pipa PVC 1/2" Bt
9 Pipa PVC 3/4" Bt
10 Pipa PVC AW 1" Bt
11 Pipa PVC AW 2" Bt
12 Pipa PVC AW 3" Bt
13 Pipa PVC AW 4" Bt
14 Pipa PVC AW 6" Bt
15 Seal tape bh
16 Urinoar bh
17 wastafel + Kran bh
18 Kran Wastafel bh
19 Grab Bar bh
20 Zink bh
21 Kran Zink bh
22 Jet Washer American Standar bh
bh
M. BAHAN WATERPROOFING
1 Water proofing (membrane) t= 3 mm m2
2 Water proofing (liquit/coating) Kg
105,000.00
143,000.00
126,000.00
153,000.00
126,000.00
153,000.00
126,000.00
153,000.00
126,000.00
163,000.00
126,000.00
126,000.00
126,000.00
126,000.00
153,000.00
-
-
187,200.00
260,000.00
260,000.00
120,000.00
-
-
220,000.00
1,000.00
3,200.00
6,300.00
466,000.00
291,000.00
24,975.00
13,500.00
-
-
70,000.00
15,300.00
6,575.00
6,575.00
4,000.00
3,900.00
3,900.00
50.00
978,000.00
1,048,000.00
270,000.00
-
-
80,000.00
90,000.00
70,000.00
75,000.00
15,000.00
11,000.00
-
-
4,355,500.00
4,355,500.00
3,484,400.00
30,000.00
45,000.00
2,800,000.00
3,400,000.00
75,000.00
105,000.00
145,000.00
226,000.00
-
-
70,000.00
850,000.00
48,000.00
85,000.00
22,000.00
15,000.00
115,000.00
183,500.00
-
-
75,000.00
6,030.00
24,000.00
21,000.00
13,100.00
12,500.00
15,000.00
22,000.00
15,700.00
12,260.00
83,200.00
109,200.00
26,100.00
73,300.00
23,000.00
127,000.00
101,600.00
85,000.00
42,000.00
137.00
10,000.00
15,000.00
115,000.00
-
-
98,000.00
115,500.00
62,400.00
65,000.00
88,500.00
-
-
-
62,800.00
70,700.00
61,600.00
23,800.00
49,900.00
31,000.00
-
-
120,000.00
275,000.00
93,000.00
136,000.00
-
-
69,225.00
5,500.00
200,000.00
149,100.00
150,000.00
191,700.00
12,780.00
142,000.00
56,000.00
56,000.00
5,000.00
43,100.00
65,000.00
19,000.00
41,700.00
-
-
356,000.00
387,980.00
75,000.00
400,000.00
2,716,000.00
150,000.00
194,000.00
31,500.00
39,100.00
43,300.00
95,200.00
195,600.00
324,100.00
720,200.00
2,500.00
2,294,440.00
1,200,000.00
168,640.00
425,520.00
230,000.00
280,000.00
175,000.00
-
-
110,000.00
63,333.33
-
-
25,000.00
1,900.00
101,200.00
76,600.00
100,700.00
221,700.00
66,030.00
914,500.00
156,910.00
15,000.00
35,535.50
-
15,000.00
8,500.00
120,000.00
60,000.00
1,600,000.00
90,000.00
40,000.00
240,000.00
HARGA SATUAN MATERIAL
Pekerjaan : Perencanaan Prototipe Rumah Susun PU-PR
Tipe Prototipe : Rusun Susun Lajang Pondok Pesantren - KDS D
Jumlah Lantai : 3 Lantai Panjang
Tahun Anggaran : 2017
A UPAH
1 Mandor
2
3 Tukang Kayu
4 Tukang Besi Beton
5 Tukang Besi / IWF
6 Tukang Batu
7 Tukang Cat
8
9
10 Pekerja
Harga Satuan Bahan Pekerjaan Review DED Rusunawa T.A. 2018 Wilayah 3 (Prototipe Ponpes) 1
GA SATUAN UPAH & BAHAN
IEW DED RUSUNAWA TA.2018
TIPE PONDOK PESANTREN)
HARGA SATUAN
SATUAN
(Rp.)
org/hr x
x
org/hr x
org/hr x
org/hr x
org/hr x
org/hr x
x
x
org/hr x
Harga Satuan Bahan Pekerjaan Review DED Rusunawa T.A. 2018 Wilayah 3 (Prototipe Ponpes) 2